See Full Document Text
Official Journal EN
of the European Union L series
2024/350 22.1.2024
COMMISSION DECISION (EU) 2024/350
of 13 December 2023
on the compliance of the corrective measures submitted by Belgium with Implementing Decision
(EU) 2023/1336
(notified under document C(2023) 8616)
(Only the English text is authentic)
(Text with EEA relevance)
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EC) No 549/2004 of the European Parliament and of the Council of 10 March 2004laying
down the framework for the creation of the single European sky (the framework Regulation)(1), and in particular
Article 11(3), point (c), thereof,
Having regard to Commission Implementing Regulation (EU) 2019/317 of 11 February 2019laying down a performance
and charging scheme in the single European sky and repealing Implementing Regulations (EU) No 390/2013 and (EU)
No 391/2013(2), and in particular Article 15(7), second paragraph, thereof,
Whereas:
GENERAL CONSIDERATIONS
(1) Following the detailed examination referred to in Article 15(3) of Implementing Regulation (EU) 2019/317, the
Commission found that the cost-efficiency performance targets for the Belgium-Luxembourg charging zone were
inconsistent with the Union-wide cost-efficiency performance targets for RP3.
(2) Consequently, pursuant to Commission Implementing Decision (EU) 2023/1336(3), Belgium and Luxembourg were
required to define and communicate to the Commission corrective measures designed to achieve consistency of their
national cost-efficiency performance targets with the Union-wide cost-efficiency performance targets for the third
reference period. Those corrective measures were to be put in place as part of draft final performance plans
established at national level by Belgium and Luxembourg respectively.
(3) On 16 September 2023, Belgium submitted to the Commission, for assessment, a first version of its draft final
performance plan including corrective measures. Following a verification of completeness, the Commission
requested Belgium to update its draft final performance plan in order to complement it with regard to certain
missing elements and address certain identified shortcomings. This Decision assesses that updated, version of the
draft final performance plan including corrective measures (‘the draft final performance plan’) which was submitted
by Belgium to the Commission on 7 November 2023.
(4) The Performance Review Body (‘PRB’), assisting the Commission in the implementation of the performance scheme
pursuant to Article 11(2) of Regulation (EC) No 549/2004, submitted a report to the Commission on the
assessment of the Belgium’s draft final performance plan including corrective measures.
(1) OJ L 96, 31.3.2004, p. 1, ELI: http://data.europa.eu/eli/reg/2004/549/oj
(2) OJ L 56, 25.2.2019, p. 1, ELI: http://data.europa.eu/eli/reg_impl/2019/317/oj
(3) Commission Implementing Decision (EU) 2023/1336 of 16 June 2023 on corrective measures to be taken by Belgium and
Luxembourg regarding certain performance targets for the third reference period in accordance with Regulation (EC) No 549/2004 of
the European Parliament and of the Council (OJ L 166, 30.6.2023, p. 119, ELI: http://data.europa.eu/eli/dec_impl/2023/1336/oj).
ELI: http://data.europa.eu/eli/dec/2024/350/oj 1/12EN
OJ L, 22.1.2024
(5) Belgium exceptionally agrees to waive its rights deriving from Article 342 of the Treaty on the Functioning of the
European Union, in conjunction with Article 3 of Regulation No 1(4), and to have this Decision adopted and
notified in English.
COMMISSION ASSESSMENT
Scope
(6) Pursuant to Article 15(7), first paragraph, of Implementing Regulation (EU) 2019/317, the corrective measures set
out in the draft final performance plan are to be assessed in order to determine whether they are sufficient to ensure
compliance with the corrective measures set out in Implementing Decision (EU) 2023/1336 and hence ensure
consistency of the cost-efficiency performance targets for the Belgium-Luxembourg charging zone with the Union-
wide performance targets for RP3. Those corrective measures have been established jointly by Belgium and
Luxembourg for their common charging zone.
(7) The Commission notes that the safety, capacity and environment performance targets set in the revised draft
performance plan remain unchanged in the draft final performance plan. The Commission did not raise any
concerns regarding those performance targets in Implementing Decision (EU) 2023/1336. Therefore, the safety,
capacity and environment performance targets should be considered consistent with the corresponding Union-wide
performance targets.
Corrective measures designed to achieve consistency of the revised cost-efficiency performance targets
with the Union-wide cost-efficiency performance targets subject to the Commission’s assessment
Corrective measures
(8) The Commission notes that the draft final performance plan includes, in essence, the following corrective measures
in respect of the air navigation service providers concerned, namely skeyes and the Maastricht Upper Area Control
Centre (‘MUAC’):
(a) review of the cost bases of skeyes and MUAC for years 2023 and 2024 (‘Corrective Measure A’);
(b) reimbursement to airspace users of the surplus from calendar year 2022 as a result of the difference between the
determined and actual costs (‘Corrective Measure B’);
(c) reimbursement to airspace users of amounts charged in the second reference period (‘RP2’) in respect of
postponed or cancelled investments in fixed assets (‘Corrective Measure C’).
(9) As part of the draft final performance plan, Belgium tasked an independent consultant to conduct, during the
summer of 2023, a compliance review of skeyes and of the MUAC (‘the compliance review of skeyes and MUAC’) in
respect of the findings set out by the Commission in Implementing Decision (EU) 2023/1336. Belgium shared the
final report of the compliance review with Commission services on 3 October 2023. Belgium explains that the
results of the compliance review were taken into account for the establishment of the corrective measures included
in the draft final performance plan.
Corrective Measure A
(10) Corrective Measure A consists of a real terms reduction of the determined costs of skeyes and MUAC in respect of
years 2023 and 2024. That corrective measure is planned to result in a total cost reduction for year 2023 of
EUR 12,9 million, expressed in real terms in 2017 prices (‘EUR 2017’), and in a total cost reduction for year 2024
of EUR 9,1 million expressed in EUR 2017.
(11) The table below presents the effect of Corrective Measure A on determined costs as broken down between skeyes and
MUAC.
(4) Regulation No 1 determining the languages to be used by the European Economic Community (OJ 17, 6.10.1958, p. 385/58, ELI:
http://data.europa.eu/eli/reg/1958/1(1)/oj).
2/12 ELI: http://data.europa.eu/eli/dec/2024/350/ojEN
OJ L, 22.1.2024
Impact on the 2023 determined costs, Impact on the 2024 determined costs,
Corrective Measure A
expressed in EUR 2017 expressed in EUR 2017
skeyes EUR - 4,6million EUR - 4,0million
MUAC EUR - 8,2million EUR - 5,0million
Total EUR - 12,9million EUR - 9,1million
(12) The Commission notes that Corrective Measure A contributes to the overall reduction of the cost base for the
Belgium-Luxembourg charging zone in 2023 and 2024 and results specifically in a reduction of the operating costs,
including staff costs and other operating costs, of both skeyes and MUAC, as required by Article 1(2) of
Implementing Decision (EU) 2023/1336.
Corrective Measure B
(13) Corrective Measure B concerns the reimbursement to airspace users of the surplus from calendar year 2022 resulting
from the difference between determined and actual costs. That surplus comprises specifically the balance between
the determined and actual costs related to the staff costs and other operating costs of skeyes and MUAC for 2022.
Cost differences for 2022 related to depreciation costs and the cost of capital are excluded from the scope of
Corrective Measure B, given that those differences are subject to the cost risk sharing rules set out in
Articles 28(3)(a) and 28(4) of Implementing Regulation (EU) 2019/317.
(14) Corrective Measure B is planned to produce effects through a one-off cost reduction of 7,7 million EUR in EUR 2017
for year 2024, as broken down in the table below between skeyes and MUAC.
Corrective Measure B Impact on the 2024 determined costs, expressed in EUR 2017
skeyes EUR - 0,1million
MUAC EUR - 7,6million
Total EUR - 7,7million
(15) The Commission notes that Corrective Measure B contributes to the overall reduction of the determined costs of
skeyes and MUAC for 2024, as required by Article 1(2) of Implementing Decision (EU) 2023/1336.
Corrective Measure C
(16) Corrective Measure C concerns the reimbursement to airspace users of unspent capital expenditure in RP2
concerning postponed or cancelled investments in fixed assets.
(17) The Commission found that, during RP2, both skeyes and MUAC postponed or cancelled several planned
investments in fixed assets which were part of the RP2 performance plan. Airspace users were partially charged for
those investments as part of the RP2 cost base for the Belgium-Luxembourg charging zone, despite the fact that
those investments were not executed and therefore did not provide the expected operational benefits. Pursuant to
Implementing Decision (EU) 2023/1336, the Commission therefore requested the national supervisory authorities
of Belgium and Luxembourg to verify that the costs charged in RP2 for the cancelled and delayed investments in
fixed assets were not double-charged to airspace users in the event that those investments materialised at later stage.
ELI: http://data.europa.eu/eli/dec/2024/350/oj 3/12EN
OJ L, 22.1.2024
(18) Belgium indicates, in the draft final performance plan, that the compliance review of skeyes and MUAC found that
certain amounts comprised in the RP3 cost bases are indeed to be refunded to users in order to avoid double-
charging for investments cancelled or postponed in RP2. To that end, a one-off cost reduction of EUR 6,1 million
expressed in EUR 2017 is to be applied for the year 2024, broken down between skeyes and MUAC in accordance
with the following table:
Corrective Measure C Impact on the 2024 determined costs, expressed in EUR 2017
skeyes EUR - 4,4million
MUAC EUR - 1,6million
Total EUR - 6,1million
(19) In respect of skeyes, the Commission notes that Corrective Measure C only leads to a partial reimbursement of the
unspent costs charged to users in RP2 for the cancelled and delayed investments in fixed assets. In accordance with
the analysis conducted by the PRB and set out in Implementing Decision (EU) 2023/1336, skeyes charged a total of
EUR 7,8 million in RP2 in respect of investments which did not materialise during that reference period.
(20) Nonetheless, the Commission notes that Corrective Measure C contributes to the overall reduction of the determined
costs of skeyes and MUAC for 2024, as required by Article 1(2) of Implementing Decision (EU) 2023/1336.
Revised cost-efficiency performance targets
(21) The following table sets out the en route cost-efficiency performance targets for RP3 for the Belgium-Luxembourg
charging zone included in the revised draft performance plan and the corresponding revised performance targets
contained in the draft final performance plan.
En route charging zone 2014 2019
of Belgium- baseline baseline 2020 – 2021 2022 2023 2024
Luxembourg value value
Cost-efficiency EUR 81,78 EUR 83,26 EUR 189,52 EUR 104,47 EUR 94,18 EUR 89,87
performance targets
contained in the revised
draft performance plan,
expressed as determined
unit cost (in real terms
in 2017 prices)
Revised cost- EUR 81,78 EUR 83,26 EUR 189,52 EUR 104,47 EUR 90,34 EUR 80,26
efficiency
performance targets
contained in the draft
final performance
plan, expressed as
determined unit cost
(in real terms in 2017
prices)
4/12 ELI: http://data.europa.eu/eli/dec/2024/350/ojEN
OJ L, 22.1.2024
(22) The Commission observes that Belgium revised downwards its cost-efficiency performance targets for 2023
and 2024 in the draft final performance plan. That downward revision represents an approximate reduction of the
determined unit cost (‘DUC’) of 4,1 % for 2023 and of 10,7 % for 2024. The Commission notes that the baseline
values for 2014 and 2019 remain unchanged in the draft final performance plan as compared to the revised draft
performance plan.
(23) The traffic forecast underlying the cost-efficiency performance targets for the Belgium-Luxembourg charging zone
was updated as part of the draft final performance plan and is in conformity with the Eurocontrol Statfor March
2023 base traffic forecast. The following table sets out the traffic assumptions, which were revised downwards for
2023 (with a negative effect on the DUC) and revised upwards for 2024 (with a positive effect on the DUC).
En route charging zone of Belgium-Luxembourg 2023 2024
Traffic forecast contained in the revised draft performance plan, 2 445 2 542
expressed in thousands of en route service units
Updated traffic forecast contained in the draft final 2 404 2 560
performance plans, expressed in thousands of en route service
units
Difference - 1,7% + 0,7%
Determined costs for calendar years 2023 and 2024
(24) The revised determined costs in real terms, expressed in EUR 2017, for calendar years 2023 and 2024, resulting
from the application of the corrective measures referred to in recitals 8 to 19 and from other adjustments applied in
the draft final performance plan, are indicated in the following table:
En route charging zone of Belgium-Luxembourg 2023 2024
Determined costs in EUR 2017, as set in the revised draft EUR 230,2million EUR 228,5million
performance plan
Revised determined costs in EUR 2017, as set in the draft EUR 217,2million EUR 205,5million
final performance plan
Difference expressed in EUR 2017 and in percentage EUR - 13,1million EUR - 23,0million
- 5,7% - 10,1%
(25) In comparison with the revised draft performance plan, the combined effect of the corrective measures established in
the draft final performance plan on the cost base of the Belgium-Luxembourg charging zone amounts to EUR - 12,8
million expressed in EUR 2017 for the year 2023 and to EUR - 22,7million expressed in EUR 2017 for year 2024.
Further residual cost reductions of EUR 0,3 million expressed inEUR 2017 for 2023 and of EUR 0,2 million
expressed in EUR 2017 for 2024 ensue from adjustments made with regard to the cost bases of Luxembourg’s Air
Navigation Administration and of the national supervisory authorities of Belgium and Luxembourg respectively.
(26) Pursuant to Implementing Decision (EU) 2023/1336 the Commission concluded that the determined costs set in
respect of Luxembourg’s Air Navigation Administration and of the national supervisory authorities of Belgium and
Luxembourg did not give rise to concerns. The related findings set out in Implementing Decision (EU) 2023/1336
remain valid, given that no major changes have been made in the draft final performance plan with regard to those
cost components.
ELI: http://data.europa.eu/eli/dec/2024/350/oj 5/12EN
OJ L, 22.1.2024
Assessment of the revised performance targets
Assessment of the revised performance targets on the basis of the assessment criteria set out in points 1.4 (a), (b) and (c) of
Annex IV to Implementing Regulation (EU) 2019/317
(27) The Commission assessed the consistency of the revised cost-efficiency performance targets set in the draft final
performance plan in accordance with the criteria laid down in points 1.4(a), (b), and (c) of Annex IV to
Implementing Regulation (EU) 2019/317.
(28) Concerning the criterion laid down in point 1.4(a) of Annex IV to Implementing Regulation (EU) 2019/317, the
Commission observes that the en route DUC trend at charging zone level of – 0,9 % over RP3 outperforms the
Union-wide trend of +1,0 % over the same period.
(29) Concerning the criterion laid down in point 1.4(b) of Annex IV to Implementing Regulation (EU) 2019/317, the
Commission observes that the long-term en route DUC trend at charging zone level over RP2 and RP3 of – 0,2%
underperforms the long-term Union-wide trend of – 1,3% over the same period.
(30) Concerning the criterion laid down in point 1.4(c) of Annex IV to Implementing Regulation (EU) 2019/317, the
Commission observes that the baseline value for the DUC of EUR 83,26 of the Belgium-Luxembourg charging zone
expressed in EUR 2017 is 13,2 % higher than the average baseline value of EUR 73,53 expressed in EUR 2017 of the
relevant comparator group.
Assessment of the capacity-related measures invoked by Belgium to justify the observed deviations from the Union-wide cost-
efficiency trends
(31) It is necessary to examine whether the deviations from the criteria set out in points 1.4(b) and 1.4(c) of Annex IV to
Implementing Regulation (EU) 2019/317, referred to in recitals 29 and 30, may be deemed necessary and
proportionate in accordance with point 1.4(d) of that Annex, provided that the observed deviation from the long-
term Union-wide DUC trend is exclusively due to additional determined costs related to measures necessary to
achieve the performance targets in the key performance area of capacity.
(32) Having regard to the calculations made by the PRB, the Commission notes that the estimated difference between the
determined costs for RP3 set in the draft final performance plan for the Belgium-Luxembourg charging zone for year
2024 and the determined costs that would be required to meet the long-term Union-wide DUC trend is
approximately EUR 19,4 million expressed in EUR 2017.
(33) In respect of the assessment criterion set out in point 1.4(d)(i) of Annex IV to Implementing Regulation
(EU) 2019/317, the Commission notes that the draft final performance plan contains seven measures for the
achievement of capacity targets (‘capacity-related measures’), which are regarded by Belgium as necessary for the
achievement of capacity targets and which according to Belgium would justify the deviations of the local cost-
efficiency performance targets from the Union-wide cost-efficiency performance targets. Two of those capacity-
related measures (‘Measures 1 and 2’) concern skeyes and five of those capacity-related measures (‘Measures 3 to 7’)
concern MUAC. The Commission already assessed those capacity-related measures, as included in the revised draft
performance plan, as part of the detailed examination referred to in recital 1. The related findings were set out
Implementing Decision (EU) 2023/1336.
(34) Measures 3 to 7 remain unchanged in the draft final performance plan therefore the findings made by the
Commission during the detailed examination with regard to those measures remain valid. Consequently, Measures 3
to 7 are deemed to be necessary and proportionate for the achievement of the capacity performance targets, on the
basis of the detailed findings presented Implementing Decision (EU) 2023/1336. On the other hand, Belgium has
modified Measures 1 and 2 in the draft final performance plan therefore those measures needed to be re-assessed.
6/12 ELI: http://data.europa.eu/eli/dec/2024/350/ojEN
OJ L, 22.1.2024
Assessment of modified Measure 1
(35) Measure 1 comprises the recruitment and training of air traffic controllers (‘ATCOs’) by skeyes in order to maintain
adequate ATCO staffing levels in RP3 and in the fourth reference period (‘RP4’).
(36) The Commission already concluded, in Implementing Decision (EU) 2023/1336, that Measure 1 is necessary for the
achievement of the local capacity performance targets. However, the Commission considered that Belgium had failed
to justify, in the revised draft performance plan, the entirety of the costs claimed to be incurred in relation to Measure
1. A portion of the costs of Measure 1 were therefore found to be unjustified in light of the achievement of capacity
targets, given that Belgium had not substantiated those costs during the detailed examination referred to in recital 1,
including with regard to the claimed cost impact of inflation.
(37) The Commission notes that Belgium has presented increased cost estimates for Measure 1 for 2023 and 2024 in the
draft final performance plan. Belgium explains that that is due to additional amounts related to the staff costs
incurred by skeyes for the remuneration of air traffic controller trainees for en route services. Belgium states that
those costs had been mistakenly omitted from the costs of Measure 1 in the previous draft performance plans
which it had submitted for RP3.
(38) Based on the information provided in the draft final performance plan, the additional staff costs referred to in recital
37 are directly linked with the capacity-enhancement measures taken pursuant to Measure 1 which have already
been found by the Commission, in Implementing Decision (EU) 2023/1336, to be relevant in view of achieving the
local capacity performance targets. Those additional staff costs should furthermore be considered proportionate in
light of the objective to ensure the safe and continuous provision by skeyes of the required air traffic control
capacity in RP3. It is therefore appropriate, in respect of Measure 1, to include those staff costs in the calculation of
the costs deemed to be necessary and proportionate for the achievement of capacity targets.
(39) On all other aspects of Measure 1, the conclusions set out in Implementing Decision (EU) 2023/1336 are upheld,
given that the draft final performance plan does not contain any argumentation or evidence which would require a
re-opening of the Commission’s analysis.
Assessment of modified Measure 2
(40) Measure 2 concerns the modernisation by skeyes of its air traffic management (‘ATM’) system to support the
integration of civil and military air navigation services and to improve capacity and operational efficiencies.
(41) In Implementing Decision (EU) 2023/1336, the Commission observed that Measure 2 included two elements,
namely the mid-life upgrade of the current ATM system of skeyes and the replacement, in the longer term, of that
current ATM system by a single, integrated and harmonizsed airspace management system to be developed together
with MUAC and the Belgian Defence as part of the ‘Shared Air Traffic Services System 3’ project (‘SAS 3 project’). The
Commission however noted, in light of credible information available at that time, that there were serious doubts
about the actual implementation of the SAS 3 project. Furthermore, the Commission excluded certain costs
presented under Measure 2 from the additional costs considered to be necessary and proportionate with regard to
the achievement of capacity targets and thus justifying a deviation from Union-wide cost-efficiency performance
targets.
(42) The Commission notes that Belgium has modified Measure 2 in the draft final performance plan both in respect of
its content and costs. On the one hand, Belgium confirms that the planned mid-life upgrade of the ATM system is
due to be implemented in 2023–2024 as a transitional measure before the roll-out of a new ATM system expected
to enter into operation at the end of RP4. On the other hand, Belgium recognises that the SAS 3 project, which
objective was to develop the new ATM system, has been suspended because ‘the risks of the project in terms of
scope, planning and scope were too high for skeyes’. According to Belgium, ‘skeyes is currently in discussion with
Belgian Defence to define the best way forward for the modernisation of the system to be commissioned in 2028’.
However, Belgium does not present any options, in the draft final performance plan, in view of either replacing or
modifying the SAS3 project.
ELI: http://data.europa.eu/eli/dec/2024/350/oj 7/12EN
OJ L, 22.1.2024
(43) The Commission further notes that the costs associated with Measure 2 have been modified for 2023 and 2024 in
the draft final performance plan. Those costs have been re-evaluated downwards in light of the latest status of the
planned ATM system investments.
(44) On the basis of the analysis of the updated information and arguments presented by Belgium, the Commission
upholds, in respect of Measure 2, the conclusions set out in Implementing Decision (EU) 2023/1336. It is clear that
the inclusion of any costs pertaining to the future new ATM system, either on the basis of the SAS3 project or any
alternative technical solution to be selected by skeyes, would be premature, given that the related investment
decision has not been made and the investment is not planned before the end of RP4. Furthermore, the
Commission reiterates its observation that only the depreciation costs and cost of capital directly incurred for
investments into the upgrade or replacement of an ATM system are to be taken into account to justify deviations
from Union-wide cost-efficiency performance targets.
(45) Therefore, as regards the additional costs deemed necessary and proportionate for the achievement of capacity
performance targets, the costs to be taken into account in respect of Measure 2 are those related to the depreciation
costs and the cost of capital incurred for the mid-life upgrade of the ATM system of skeyes, as specified in
Implementing Decision (EU) 2023/1336.
Conclusions on the capacity-related measures invoked by Belgium and Luxembourg to justify the observed
deviations from the Union-wide cost-efficiency trends
(46) In respect of the criterion set out in point 1.4(d)(i) of Annex IV to Implementing Regulation (EU) 2019/317, the
Commission concludes on the basis of the findings set out in recitals 31 to 45, that the costs presented in the draft
final performance plan for Measures 1 and 2 are partially necessary and proportionate for the achievement of
capacity performance targets, whilst in respect of Measures 3 to 7 the presented costs are fully necessary and
proportionate for the achievement of those targets.
(47) Having regard to the analysis made by the PRB, the following table indicates the computed monetary impact of the
capacity-related measures on the DUC trend for the Belgium-Luxembourg charging zone with regard to the relevant
year, namely 2024:
Capacity-related measures Monetary impact on the DUC trend for the Belgium-Luxembourg charging zone, expressed
presented in the draft final in EUR 2017, taking into account the costs deemed by the Commission to be necessary
performance plan and proportionate for the achievement of capacity targets(1)
Measure 1 EUR 8,2million(2)
Measure 2 EUR 0,3million(3)
Measure 3 EUR 4,3million
Measure 4 EUR 0,3million
Measure 5 EUR 4,7million
Measure 6 EUR 1,4million
Measure 7 EUR 0,3million
Total EUR 19,5million
(1) Calculations based on the updated inflation index used in the draft final performance plan.
(2) Revised amount reflecting the share of the costs of Measure 1 which was found by the Commission to be necessary and
proportionate for the achievement of the local capacity performance targets, in accordance with recitals 47 and 48.
(3) Amount reflecting the share of the costs of Measure 2 which was found by the Commission to be necessary and proportionate
for the achievement of the local capacity performance targets, in accordance with recital 54. That amount has not changed
since the corrective measures to be taken by Belgium and Luxembourg set out in Implementing Decision (EU) 2023/1336.
8/12 ELI: http://data.europa.eu/eli/dec/2024/350/ojEN
OJ L, 22.1.2024
(48) The capacity-related measures indicated in the table in recital 52 represented a total excess of EUR 19,5 million
expressed in EUR 2017 in relation to the 2024 cost base. Consequently, the observed deviation of EUR 19,4 million
expressed in EUR 2017 from the Union-wide long-term DUC trend, outlined in recital 32, should be considered as
justified entirely by the additional determined costs related to the capacity-related measures presented in the draft
final performance plan.
(49) Therefore, the Commission concludes that the criterion set out in point 1.4(d)(i) of Annex IV to Implementing
Regulation (EU) 2019/317 is fulfilled.
Conclusion on the assessment of the corrective measures designed to achieve consistency of the revised
cost-efficiency performance targets with the Union-wide cost-efficiency performance targets
(50) On the basis of the findings set out in recitals 6 to 49, the Commission concludes that the corrective measures set
out in the draft final performance plan result in a reduction of the determined costs for the Belgium-Luxembourg
charging zone. This leads to the revised cost-efficiency performance targets which should be considered consistent
with the Union-wide performance targets for RP3.
Review of the revised cost-efficiency performance targets for terminal air navigation services
(51) In Implementing Decision (EU) 2023/1336, the Commission raised concerns regarding the terminal cost-efficiency
targets proposed by Belgium in the revised draft performance plan and considered that Belgium was to further
justify those targets or revise them downwards.
(52) The Commission observes that the draft final performance plan includes improved terminal cost-efficiency
performance targets for Belgium in respect of calendar years 2023 and 2024, including a reduction of the
determined costs of EUR 1,8 million expressed in EUR 2017 for 2023 and of EUR 1,4 million expressed in
EUR 2017 for 2024. Nevertheless, the terminal DUC trend of Belgium of +3,1 % over RP3 remains higher than the
en route DUC trend of – 0,9 % over RP3, and remains higher than the actual terminal DUC trend of +0,5 %
observed over RP2. Furthermore, the terminal DUC remains higher by an estimated significant margin of 52,8 %, in
comparision to the median terminal DUC of its relevant comparator group of airports. The Commission also notes
that Belgium has not presented any further justifications in the draft final performance plan with regard to the level
of its terminal cost-efficiency performance targets.
(53) On the basis of the findings set out in recital 52, the Commission concludes that the revised terminal cost-efficiency
performance targets of Belgium continue to give rise to concerns. The Commission therefore reiterates its view, as set
out in Implementing Decision (EU) 2023/1336, that Belgium should revise downwards those targets or provide
adequate justifications for those targets. Belgium should address that observation in connection with the adoption
of its final performance plan pursuant to Article 16, point (a), of Implementing Regulation (EU) 2019/317.
Review of the incentive schemes referred to in Article 11 of Implementation Regulation (EU) 2019/317
(54) In Implementing Decision (EU) 2023/1336, the Commission concluded that Belgium is to revise its incentive
schemes for achieving en route and terminal capacity targets in such a way that the maximum financial disadvantage
stemming from those incentive schemes has a material impact on the revenue at risk. The Commission notes that
Belgium has nonetheless kept its incentive schemes unchanged in the draft final performance plan.
(55) Therefore, the Commission concludes that the en route and terminal capacity incentive schemes set out by Belgium in
the draft final performance plan continue to give rise to concerns. The Commission therefore reiterates its view that
Belgium should revise, in connection with the adoption of its final performance plan pursuant to Article 16, point
(a), of Implementing Regulation (EU) 2019/317, its incentive schemes for achieving en route and terminal capacity
targets in order for the maximum financial disadvantage stemming from those incentive schemes to be set at a level
having a material impact on the revenue at risk, as expressly required by Article 11(3), point (a) of Implementing
Regulation (EU) 2019/317. In the Commission’s view, that revision should lead to a maximum financial
disadvantage equal to or higher than 1 % of the annual determined costs.
ELI: http://data.europa.eu/eli/dec/2024/350/oj 9/12EN
OJ L, 22.1.2024
CONCLUSION
(56) The corrective measures included in the draft final performance plan in respect of the revised cost-efficiency
performance targets for the Belgium-Luxembourg charging zone should be found to be compliant with
Implementing Decision (EU) 2023/1336. Following those corrective measures the revised cost-efficiency
performance targets should be considered consistent with the corresponding Union-wide performance targets for
RP3.
(57) The Commission notes that Belgium has, however, not addressed, in connection with its draft final performance
plan, the following issues relating to the findings made by the Commission during the detailed examination referred
to in recital 1 and presented in Implementing Decision (EU) 2023/1336:
(a) incorrect application of the respective legal provisions governing traffic risk sharing, cost risk sharing and
incentive schemes in respect of MUAC;
(b) incorrect financing arrangements for the costs incurred for services provided by skeyes and MUAC in cross-
border areas;
(c) incorrect allocation of the approach costs between en route and terminal air navigation services in respect of
skeyes;
(d) incorrect level of the maximum financial disadvantages in the incentive schemes of Belgium supporting the
achievement of en route and terminal capacity targets, referred to in recitals 54 and 55.
(58) Therefore, the Commission concludes that Belgium should address, without delay, the findings set out in recital 57.
This conclusion is without prejudice to any infringement proceedings which the Commission may undertake in
respect of those findings,
HAS ADOPTED THIS DECISION:
Article 1
The corrective measures set out in the draft final performance plan submitted by Belgium to the Commission on
7 November 2023, pursuant to Regulation (EC) No 549/2004, in respect of its cost-efficiency performance targets for the
third reference period, are compliant with Implementing Decision (EU) 2023/1336.
The performance targets contained in the draft final performance plan submitted by Belgium on 7 November 2023,
pursuant to Regulation (EC) No 549/2004, and set out in the Annex to this Decision, are consistent with the Union-wide
performance targets for the third reference period set out in Commission Implementing Decision (EU) 2021/891(5).
Article 2
This Decision is addressed to the Kingdom of Belgium.
Done at Brussels, 13 December 2023.
For the Commission
Adina-Ioana VĂLEAN
Member of the Commission
(5) Commission Implementing Decision (EU) 2021/891 of 2 June 2021 setting revised Union-wide performance targets for the air traffic
management network for the third reference period (2020-2024) and repealing Implementing Decision (EU) 2019/903 (OJ L 195,
3.6.2021, p. 3, ELI: http://data.europa.eu/eli/dec_impl/2021/891/oj).
10/12 ELI: http://data.europa.eu/eli/dec/2024/350/ojEN
OJ L, 22.1.2024
ANNEX
Performance targets included in the draft final performance plan submitted by Belgium pursuant to
Regulation (EC) No 549/2004, found to be consistent with the Union-wide performance targets for
the third reference period
KEY PERFORMANCE AREA OF SAFETY
Effectiveness of safety management
Targets on the effectiveness of safety management, expressed as a level of implementation, ranging
Belgium
from European Aviation Safety Agency (‘EASA’) level A to D
Air navigation service
Safety management objective 2023 2024
provider concerned
Safety policy and objectives C C
Safety risk management D D
skeyes Safety assurance C C
Safety promotion C C
Safety culture C C
Safety policy and objectives C C
Safety risk management D D
MUAC Safety assurance C C
Safety promotion C C
Safety culture C C
KEY PERFORMANCE AREA OF ENVIRONMENT
Average horizontal en route flight efficiency of the actual trajectory
Belgium 2023 2024
Targets in the key performance area of environment, expressed as
3,00% 3,00%
the average horizontal en route flight efficiency of the actual trajectory
KEY PERFORMANCE AREA OF CAPACITY
Average en route ATFM delay in minutes per flight
Belgium 2023 2024
Targets in the key performance area of capacity, expressed in
0,17 0,17
minutes of ATFM delay per flight
ELI: http://data.europa.eu/eli/dec/2024/350/oj 11/12EN
OJ L, 22.1.2024
KEY PERFORMANCE AREA OF COST-EFFICIENCY
Determined unit cost for en route air navigation services
2014 2019
En route charging zone of
baseline baseline 2020 -2021 2022 2023 2024
Belgium-Luxembourg
value value
En route cost-efficiency EUR 81,78 EUR 83,26 EUR 189,52 EUR 104,47 EUR 90,34 EUR 80,26
targets, expressed as
determined en route unit cost
(in real terms in EUR 2017)
12/12 ELI: http://data.europa.eu/eli/dec/2024/350/oj