Home Europe European Commission Commission Decision (EU) 2025/1055 of 19 May 2025 on the con...
Date: 2025-05-28 Category: Not Applicable State: Union Government Country: Europe

Commission Decision (EU) 2025/1055 of 19 May 2025 on the consistency of the performance targets included in the draft performance plan submitted by Sweden pursuant to Regulation (EC) No 549/2004 of the European Parliament and of the Council with the Union-wide performance targets for the fourth reference period of the Single European Sky performance and charging scheme (notified under document C(2025) 2927)

Issued by European Commission · Directorate-General for Mobility and Transport

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

## Policy Analysis Report: Commission Decision (EU) 2025/1055 Regarding Swedish Performance Targets for the Single European Sky (RP4) **1. Executive Summary:** This report analyzes Commission Decision (EU) 2025/1055, a document assessing the consistency of Sweden's performance targets for the fourth reference period (RP4: 2025-2029) of the Single European Sky (SES) performance and charging scheme with Union-wide targets. The policy concludes that Sweden's proposed performance targets in the areas of safety, environment, and cost-efficiency are consistent with Union-wide targets. However, the Commission expresses concerns regarding the capacity targets for terminal air navigation services and requests further justification or revision of those targets. The report provides a detailed overview of the decision, its objectives, and key findings, highlighting the impact on air navigation service providers in Sweden. **2. Introduction:** This report aims to provide an informative overview and analysis of Commission Decision (EU) 2025/1055 based solely on the provided text. The report outlines the decision's key aspects, including its purpose, scope, and implications for stakeholders in the Swedish air navigation sector. The document relates to the assessment of Sweden's draft performance plan under the Single European Sky (SES) initiative. **3. Policy Overview:** * **Core Objective(s):** The core objective of this decision is to assess the consistency of the performance targets included in Sweden's draft performance plan for RP4 (2025-2029) with the Union-wide performance targets for the Single European Sky (SES). The assessment covers the key performance areas of safety, environment, capacity, and cost-efficiency. **4. Background and Rationale:** This policy addresses the requirement under Regulation (EC) No 549/2004 for Member States to establish performance plans with targets consistent with Union-wide objectives for air navigation services. The policy ensures that national plans align with broader European objectives for a more efficient and integrated air traffic management system. The assessment ensures all member states are moving towards the EU wide performance targets set out in Commission Implementing Decision EU 2024/1688. **5. Key Provisions / Changes:** This policy is not an amendment, but rather a decision assessing Sweden's draft performance plan. The key provisions of the decision are: * **Safety:** The Commission finds Sweden's proposed safety performance targets for air navigation service providers (LFV, ACR, SDATS, AFAB) to be consistent with Union-wide safety targets. * **Environment:** The Commission determines that Sweden's environment targets, measured by the average horizontal en route flight efficiency of the actual trajectory, are consistent with the relevant reference values from the European Route Network Improvement Plan (ERNIP). * **Capacity:** The Commission finds Sweden's en route capacity targets, expressed in minutes of ATFM delay per flight, to be consistent with the reference values from the Network Operations Plan. * **Terminal Capacity (Concern):** The Commission raises concerns regarding the proposed terminal capacity targets, noting a significant deterioration in average arrival ATFM delay per flight compared to the previous reference period (RP3). It requests Sweden to further justify or revise these targets. * **Cost-Efficiency:** The Commission concludes that Sweden's cost-efficiency targets for en route air navigation services are consistent with Union-wide cost-efficiency performance targets, even considering the impact of traffic reductions due to the war in Ukraine. * **Terminal Cost-Efficiency:** The Commission found that the cost-efficiency targets for terminal air navigation services do not give rise to concerns. **6. Target Audience and Stakeholders:** The primary target audience and stakeholders are: * The Kingdom of Sweden, specifically its air navigation service providers (ANSPs). * LFV (the main Swedish ANSP) * ACR, SDATS, and AFAB (providers of terminal air navigation services). * The Swedish government agencies responsible for air traffic management and regulation. * Airspace users operating within Swedish airspace. **7. Implementation Aspects (Inferred):** * **Responsible agency/bodies:** The Commission, assisted by the Performance Review Body (PRB), is responsible for assessing the consistency of the national performance plans. In Sweden, LFV, ACR, SDATS and AFAB are responsible for implementing the measures to achieve the set targets. * **Timelines or procedures:** The decision is based on the updated draft performance plan submitted by Sweden by 15 November 2024. Sweden is expected to address the Commission's concerns regarding terminal capacity targets in its final performance plan, which is to be adopted in accordance with Article 16 of Implementing Regulation (EU) 2019/317. The performance targets are for the reference period 2025-2029. * The text indicates that measures for achieving the local targets include implementing enhanced cross-border free route airspace, airspace changes to shorten routes (SWEA project), sector optimization, improvements to airspace management, and a moderate increase in air traffic controllers. **8. Expected Outcomes / Impact of Changes:** The expected outcomes and impact of this decision are: * Sweden will continue to implement its performance plan in line with the assessed targets for safety, environment, and en route capacity. * Sweden is required to justify or revise its terminal capacity targets to avoid potential deterioration in arrival ATFM delays. Failure to do so could result in further scrutiny or potential non-compliance with Union-wide performance targets. * The decision aims to ensure that Swedish air navigation services contribute to the overall efficiency and performance of the Single European Sky. * The adjusted cost-efficiency assessment, accounting for the impact of the war in Ukraine, avoids penalizing Sweden for factors outside its control. **9. Conclusion:** Commission Decision (EU) 2025/1055 confirms the general consistency of Sweden's air navigation performance targets with the Union-wide objectives for the Single European Sky's fourth reference period. The decision highlights the importance of aligning national performance plans with broader European goals for safety, efficiency, and sustainability in air traffic management. The Commission's request for further justification or revision of terminal capacity targets indicates a potential area for improvement in Sweden's air navigation service provision. The consideration of external factors, like the impact of the war in Ukraine, demonstrates a nuanced approach to performance assessment within the SES framework.

Key Entities Referenced

European Union: A political and economic union of member states located primarily in Europe. L series 2025/1055: Reference to the Official Journal publication details. 28.5.2025: Date of the Official Journal publication. COMMISSION DECISION (EU) 2025/1055: Identification of the document type and number. 19 May 2025: Date of the Commission Decision. Sweden: Member State of the European Union addressed in this decision, specifically concerning its draft performance plan. Regulation (EC) No 549/2004: Regulation of the European Parliament and of the Council laying down the framework for the creation of the single European sky (the framework Regulation). European Parliament: One of the legislative bodies of the European Union. Council: Refers to the Council of the European Union, another legislative body. Single European Sky: An initiative to reform the architecture of European air traffic management. C(2025) 2927: Document number associated with the notification. Treaty on the Functioning of the European Union: The legal basis for the EU's powers. Article 11(3) point c: Specific article and point of Regulation (EC) No 549/2004 related to performance targets. Regulation (EU) 2024/2803: Regulation of the European Parliament and of the Council on the implementation of the Single European Sky. Article 5(8)(3): Specific article and point of Regulation (EU) 2024/2803 related to the implementation of the Single European Sky. Commission Implementing Regulation (EU) 2019/317: Regulation laying down a performance and charging scheme in the single European sky. Implementing Regulations (EU) No 390/2013: Regulations being repealed by Commission Implementing Regulation (EU) 2019/317. Implementing Regulations (EU) No 391/2013: Regulations being repealed by Commission Implementing Regulation (EU) 2019/317. Article 14(1)(2): Specific article and point of Implementing Regulation (EU) 2019/317. Member States: Countries that are part of the European Union. functional airspace blocks FABs: Specific airspaces for cooperation. RP4, 2025-2029: The fourth reference period of the performance and charging scheme. Commission Implementing Decision (EU) 2024/1688: Decision setting Unionwide performance targets for air traffic management network for RP4. 1 October 2024: Date by which Member States were to submit draft performance plans. 15 November 2024: Date by which Member States were to submit updated draft performance plans. Performance Review Body (PRB): Body assisting the Commission in the implementation of the performance scheme. Annex IV: Annex to Implementing Regulation EU 2019/317 outlining criteria for assessing performance targets. Article 15(2): Specific article of Regulation (EC) No 550/2004 Regulation (EC) No 550/2004: Regulation of the European Parliament and of the Council on the provision of air navigation services in the single European sky (the service provision Regulation). safety: Key performance area related to air traffic safety. EASA level A to D: Levels of implementation based on European Aviation Safety Agency standards. LFV: Air navigation service provider in Sweden. ACR: Provider of terminal air navigation services in the scope of the draft performance plan. SDATS: Provider of terminal air navigation services in the scope of the draft performance plan. AFAB: Provider of terminal air navigation services in the scope of the draft performance plan. environment: Key performance area related to environmental impact, particularly flight efficiency. European Route Network Improvement Plan (ERNIP): Plan drawn up in accordance with Annex I to Commission Implementing Regulation EU 2019/1236, used as a reference for environment targets. Commission Implementing Regulation EU 2019/1236: Regulation relevant to the European Route Network Improvement Plan (ERNIP). 2 July 2024: Date of the Unionwide performance targets for RP4 Stockholm Arlanda: Airport in Sweden. Gothenburg Landvetter airports: Airport in Sweden. SWEA project: Project in Sweden related to airspace changes. capacity: Key performance area related to air traffic capacity and delays. air traffic flow management (ATFM) delay: Metric used to measure capacity performance. Network Operations Plan: Plan used as a reference for capacity targets, drawn up in accordance with Article 9 of Commission Implementing Regulation EU 2019/123. Commission Implementing Regulation EU 2019/123: Regulation laying down detailed rules for the implementation of air traffic management (ATM) network functions. Articles 13 and 4: Refers to specific articles within Implementing Regulation EU 2019/317 that define the scope and application of the regulation regarding airports. RP3: The third reference period, used as a comparison for performance. 2024: A year for performance comparison. costefficiency: Key performance area related to the cost of air navigation services. determined unit cost (DUC): Metric used to measure cost efficiency. Article 7: Article in Implementing Decision EU 2024/1688 EUR2022: Refers to Euro values adjusted to 2022 prices, used for consistent comparison of costs over time. Russias war of aggression against Ukraine: A geopolitical event impacting air traffic and cost efficiency. en route service units: A unit of measurement used in air navigation services, related to the distance flown within controlled airspace. Article 16: Article about the adoption of a final performance plan Kingdom of Sweden: Addressee of the decision. Brussels: Location where the decision was made. Apostolos TZITZIKOSTAS: Member of the Commission. European Aviation Safety Agency: EASA, mentioned as the source of safety management levels.
Official Source Record View Original Source →
See Full Document Text
Official Journal EN of the European Union L series 2025/1055 28.5.2025 COMMISSION DECISION(EU) 2025/1055 of 19 May 2025 on the consistency of the performance targets included in the draft performance plan submitted by Sweden pursuant to Regulation (EC) No 549/2004 of the European Parliament and of the Council with the Union-wide performance targets for the fourth reference period of the Single European Sky performance and charging scheme (notified under document C(2025) 2927) (Only the Swedish text is authentic) THE EUROPEAN COMMISSION, Having regard to the Treaty on the Functioning of the European Union, Having regard to Regulation (EC) No 549/2004 of the European Parliament and of the Council of 10 March 2004 laying down the framework for the creation of the single European sky (the framework Regulation)(1), and in particular Article 11(3) point (c) thereof, Having regard to Regulation (EU) 2024/2803 of the European Parliament and of the Council of 23 October 2024 on the implementation of the Single European Sky(2), and in particular Article 58(3) thereof, Having regard to Commission Implementing Regulation (EU) 2019/317 of 11 February 2019 laying down a performance and charging scheme in the single European sky and repealing Implementing Regulations (EU) No 390/2013 and (EU) No 391/2013(3), and in particular Article 14(2) thereof, Whereas: GENERAL CONSIDERATIONS (1) Pursuant to Article 11 of Regulation (EC) No 549/2004, Member States are to draw up plans, either at national level or at the level of functional airspace blocks (‘FABs’), including performance targets, for each reference period of the performance and charging scheme for air navigation services and network functions. Those plans are to include local performance targets which are consistent with the Union-wide performance targets for the reference period concerned. (2) The Union-wide performance targets for the fourth reference period (‘RP4’, 2025-2029) were set out in Commission Implementing Decision (EU) 2024/1688(4). (3) All Member States have drawn up and adopted draft performance plans for RP4, which were submitted to the Commission for assessment by 1 October 2024. Following the verification of completeness of those draft performance plans, the Commission requested Member States to submit updated draft performance plans by 15 November 2024. (4) The Commission’s assessment presented in this Decision is based on the updated draft performance plan for RP4 submitted by Sweden (‘the draft performance plan’). (5) The Performance Review Body (‘PRB’), assisting the Commission in the implementation of the performance scheme, has submitted to the Commission a report containing its advice on the assessment of the draft performance plans. (1) OJ L 96, 31.3.2004, p. 1, ELI: http://data.europa.eu/eli/reg/2004/549/oj. (2) OJ L, 2024/2803, 11.11.2024, ELI: http://data.europa.eu/eli/reg/2024/2803/oj. (3) OJ L 56, 25.2.2019, p. 1, ELI: http://data.europa.eu/eli/reg_impl/2019/317/oj. (4) Commission Implementing Decision (EU) 2024/1688 of 12 June 2024 setting Union-wide performance targets for the air traffic management network for the fourth reference period from 1 January 2025 to 31 December 2029 (OJ L, 2024/1688, 17.6.2024, ELI: http://data.europa.eu/eli/dec_impl/2024/1688/oj). ELI: http://data.europa.eu/eli/dec/2025/1055/oj 1/8EN OJ L, 28.5.2025 (6) In accordance with Article 14(1) of Implementing Regulation (EU) 2019/317, the Commission has assessed the consistency of the local performance targets included in the draft performance plan on the basis of the criteria laid down in point 1 of Annex IV to that Implementing Regulation, and taking account of local circumstances where relevant. (7) The Commission has complemented its assessment of the draft performance plan with a review of the elements set out in point 2 of Annex IV to that Implementing Regulation. In respect of point 2.1(d)(vii) of Annex IV to Implementing Regulation (EU) 2019/317, the Commission notes that it has not conducted, as part of that review, a detailed analysis of the methodology used by Sweden for the allocation of costs between en route and terminal services in RP4. Therefore, the Commission has not drawn any conclusions, at this stage, in respect of the compliance of that cost allocation methodology with points (e) and (f) of Article 15(2) Regulation (EC) No 550/2004 of the European Parliament and of the Council(5) and Article 22(5) of Implementing Regulation (EU) 2019/317. COMMISSION ASSESSMENT Assessment of the safety targets (8) As regards the key performance area of safety, the consistency of the targets included in the draft performance plan has been assessed in accordance with point 1.1 of Annex IV to Implementing Regulation (EU) 2019/317. (9) The performance targets in the key performance area of safety proposed by Sweden in respect of the effectiveness of safety management, broken down per safety management objective and expressed as a level of implementation, are as follows: Targets on the effectiveness of safety management, expressed as a level of implementation, Sweden ranging from EASA level A to D Air navigation Safety management 2025 2026 2027 2028 2029 service provider objective Safety policy and C C C C C objectives Safety risk management D D D D D LFV Safety assurance C C C C C Safety promotion C C C C C Safety culture C C C C C (10) The Commission has found that the safety performance targets proposed by Sweden for the air navigation service provider ‘LFV’ are equal to the Union-wide safety targets in respect of each calendar year from 2025 to 2029. (11) The Commission notes that the draft performance plan has presented the measures to be put in place by LFV for the achievement of the local safety targets, which relate to the implementation of its safety management system. (12) The safety targets proposed by Sweden for the providers of terminal air navigation services in the scope of the draft performance plan, namely ‘ACR’, ‘SDATS’ and ‘AFAB’, are also in line with the Union-wide performance targets. The Commission further notes that Sweden has presented measures for the achievement of their safety performance targets. (5) Regulation (EC) No 550/2004 of the European Parliament and of the Council of 10 March 2004 on the provision of air navigation services in the single European sky (the service provision Regulation) (OJ L 96, 31.3.2004, p. 10, ELI: http://data.europa.eu/eli/reg/ 2004/550/oj). 2/8 ELI: http://data.europa.eu/eli/dec/2025/1055/ojEN OJ L, 28.5.2025 (13) On the basis of the findings set out in recitals (9) to (12), the local safety performance targets included in the draft performance should be considered consistent with the Union-wide performance targets. Assessment of the environment targets (14) As regards the key performance area of environment, the consistency of the targets included in the draft performance plan regarding the average horizontal en routeflight efficiency of the actual trajectory has been assessed based on the criterion laid down in point 1.2 of Annex IV to Implementing Regulation (EU) 2019/317. Accordingly, the proposed environment targets of Sweden have been compared to the relevant en route horizontal flight efficiency reference values set out in the European Route Network Improvement Plan (‘ERNIP’), drawn up in accordance with Annex I to Commission Implementing Regulation (EU) 2019/123(6) and available at the time of adopting the Union-wide performance targets for RP4, that is on 2 July 2024. (15) The environment performance targets proposed by Sweden for RP4 and the corresponding national reference values from the ERNIP, expressed as the average horizontal en routeflight efficiency of the actual trajectory, are as follows: Sweden 2025 2026 2027 2028 2029 Targets in the key performance area of environment, expressed 1,73 % 1,71 % 1,69 % 1,67 % 1,65 % as the average horizontal en routeflight efficiency of the actual trajectory Reference values 1,73 % 1,71 % 1,69 % 1,67 % 1,65 % (16) The Commission observes that the environment targets proposed by Sweden are equal to the corresponding national reference values for each calendar year of RP4. (17) The Commission notes that Sweden has presented in the draft performance plan measures for the achievement of the local environment targets, which include the implementation of enhanced cross-border free route airspace, and planned airspace changes to shorten the routes flown by airspace users to the Stockholm Arlanda and also Gothenburg Landvetter airports (‘the SWEA project’). (18) On the basis of the findings set out in recitals (15), (16) and (17), the targets in the key performance area of environment included in the draft performance plan should be considered consistent with the Union-wide performance targets for RP4. Assessment of the capacity targets (19) As regards the key performance area of capacity, the consistency of the targets included in the draft performance plan regarding the average en routeair traffic flow management (‘ATFM’) delay per flight has been assessed based on the criterion laid down in point 1.3 of Annex IV to Implementing Regulation (EU) 2019/317. Accordingly, the proposed en route capacity targets of Sweden have been compared to the relevant reference values set out in the Network Operations Plan drawn up in accordance with Article 9 of Commission Implementing Regulation (EU) 2019/123 and available at the time of adopting the Union-wide performance targets for RP4, that is on 2 July 2024. (6) Commission Implementing Regulation (EU) 2019/123 of 24 January 2019 laying down detailed rules for the implementation of air traffic management (ATM) network functions and repealing Commission Regulation (EU) No 677/2011 (OJ L 28, 31.1.2019, p. 1, ELI: http://data.europa.eu/eli/reg_impl/2019/123/oj). ELI: http://data.europa.eu/eli/dec/2025/1055/oj 3/8EN OJ L, 28.5.2025 (20) The en routecapacity targets proposed by Sweden for RP4, expressed in minutes of ATFM delay per flight, and the corresponding reference values from the Network Operations Plan, are as follows: Sweden 2025 2026 2027 2028 2029 Targets in the key performance area of capacity, expressed in 0,18 0,13 0,11 0,11 0,11 minutes of en routeATFM delay per flight Reference values 0,18 0,13 0,11 0,11 0,11 (21) The Commission observes that the capacity targets proposed by Sweden are equal to the corresponding national reference values for each calendar year of RP4. (22) The Commission notes that Sweden has presented in the draft performance plan measures for the achievement of the local en routecapacity targets which include sector optimization, improvements to airspace management and of air traffic flow and capacity management, dynamic sector configurations, the implementation of the SWEA project, and a moderate increase in the number of air traffic controllers in operations at the area control centres. (23) On the basis of the findings set out in recitals (20), (21) and (22), the targets in the key performance area of capacity included in the draft performance plan should be considered consistent with the Union-wide performance targets for RP4. Review of the capacity targets for terminal air navigation services (24) In accordance with point 2.1(b) of Annex IV to Implementing Regulation (EU) 2019/317, the Commission has complemented its assessment of the draft performance plan by reviewing the capacity performance targets for terminal air navigation services set in respect of the airports referred to in Articles 1(3) and (4) of that Implementing Regulation. It was found that those targets give rise to concerns. (25) The Commission notes that the proposed terminal capacity targets for RP4 lead to a significant deterioration of the average arrival ATFM delay per year compared to the third reference period (‘RP3’). Indeed, the proposed RP4 targets are set at 0,35 minute per flight, whereas an actual performance of 0,07 minute of ATFM delay per flight was recorded for year 2024. (26) Therefore, the Commission considers that, in connection with the adoption of its final performance plan in accordance with Article 16, point (a) of Implementing Regulation (EU) 2019/317, Sweden should further justify the terminal capacity targets for RP4 in light of the observations set out in recital (25), or should revise downwards those targets. Assessment of the cost-efficiency targets (27) As regards the key performance area of cost-efficiency, the consistency of the targets included in the draft performance plan regarding the determined unit cost (‘DUC’) for en route air navigation services has been assessed based on the criteria laid down in points 1.4(a), (b) and (c) of Annex IV to Implementing Regulation (EU) 2019/317. Those criteria consist of the DUC trend over RP4, the long-term DUC trend over RP3 and RP4 (2020-2029), and the baseline value for the DUC at charging zone level compared with the average value of the charging zones where air navigation service providers have a similar operational and economic environment. 4/8 ELI: http://data.europa.eu/eli/dec/2025/1055/ojEN OJ L, 28.5.2025 (28) The en routecost-efficiency targets proposed by Sweden for RP4, and the related baseline values, are as follows: 2019 2024 En routecharging zone of baseline baseline 2025 2026 2027 2028 2029 Sweden value value Targets and baseline SEK SEK SEK SEK SEK SEK SEK values in the key 585,33 766,73 724,19 691,88 672,80 661,87 645,00 performance area of cost- efficiency,expressed as determined unit cost (in real EUR EUR EUR EUR EUR EUR EUR terms at 2022 prices) 55,10 72,17 68,17 65,13 63,33 62,30 60,71 (29) Concerning the assessment criterion set out in point 1.4(a) of Annex IV to Implementing Regulation (EU) 2019/317, the Commission observes that Sweden’s DUC trend at charging zone level of - 3,4 % over RP4 outperforms the Union-wide trend of - 1,2 % over the same period. (30) Concerning the assessment criterion set out in point 1.4(b) of Annex IV to Implementing Regulation (EU) 2019/317, the Commission observes that Sweden’s long-term DUC trend at charging zone level over RP3 and RP4 of +1,1 % underperforms the long-term Union-wide trend of - 1,0 % over the same period. (31) The Commission notes, however, that Sweden has lost, as a consequence of Russia’s war of aggression against Ukraine, a significant share of the overflights which it historically used to serve. That traffic reduction continues over RP4 to considerably impact the cost-efficiency performance of the air navigation service provider and has, in particular, a negative effect on the long-term DUC trend of Sweden. (32) It is therefore necessary and appropriate to examine, for the purpose of the assessment criterion referred to in recital (30), whether Sweden would meet the Union-wide long-term DUC trend in absence of the circumstances referred to in recital (31). (33) To this end, the Commission has recalculated the long-term DUC trend in light of the estimated structural loss of traffic for Sweden as a consequence of the war in Ukraine, measured in en route service units. That recalculation results in an adjusted long-term DUC trend for Sweden of - 2,0 %, which outperforms the long-term Union-wide DUC trend of - 1,0 %. Therefore, it is concluded that Sweden fulfils the assessment criterion referred to in (30) after considering the effect of the significant traffic reduction resulting from the war in Ukraine. (34) Concerning the assessment criterion set out in point 1.4(c) of Annex IV to Implementing Regulation (EU) 2019/317, the Commission observes that Sweden’s baseline value for the DUC of EUR 72,17 in real terms at 2022 prices (‘EUR2022’) is 17,9 % higher than the average baseline value of EUR 61,19 in EUR2022 of the relevant comparator group set out in Article 7 Implementing Decision (EU) 2024/1688. (35) As outlined in recital (29), it is clear that the DUC of Sweden over RP4 outperforms the corresponding Union-wide trend by a significant margin. Furthermore, as shown in recitals (30) to (33), when excluding the negative impact of the traffic changes resulting from Russia’s war of aggression against Ukraine, Sweden meets the Union-wide long- term DUC trend. Therefore, the Commission considers that the deviation from the average DUC baseline for 2024 referred to in recital (34) does not preclude Sweden’s cost-efficiency performance targets from being consistent with the Union-wide cost-efficiency performance targets. (36) On the basis of the findings set out in recitals (28) to (35), the targets in the key performance area of cost-efficiency included in the draft performance plan should be considered consistent with the Union-wide performance targets for RP4. ELI: http://data.europa.eu/eli/dec/2025/1055/oj 5/8EN OJ L, 28.5.2025 Review of the cost-efficiency targets for terminal air navigation services (37) In accordance with point 2.1(c) of Annex IV to Implementing Regulation (EU) 2019/317, the Commission has complemented its assessment of the draft performance plan by reviewing the cost-efficiency performance targets for terminal air navigation services set in respect of the airports referred to in Articles 1(3) and (4) of that Implementing Regulation. It was found that those targets do not give rise to concerns. CONCLUSIONS (38) In the light of the foregoing, the performance targets included in the draft performance plan of Sweden should be considered consistent with the Union-wide performance targets for RP4, HAS ADOPTED THIS DECISION: Article 1 The performance targets included in the draft performance plan submitted by Sweden for the fourth reference period (‘RP4’), listed in the Annex to this Decision, are consistent with the Union-wide performance targets for RP4 set out in Implementing Decision (EU) 2024/1688. Article 2 This Decision is addressed to the Kingdom of Sweden. Done at Brussels, 19 May 2025. For the Commission Apostolos TZITZIKOSTAS Member of the Commission 6/8 ELI: http://data.europa.eu/eli/dec/2025/1055/ojEN OJ L, 28.5.2025 ANNEX Performance targets included in the draft performance plan of Sweden, found to be consistent with the Union-wide performance targets for the fourth reference period KEY PERFORMANCE AREA OF SAFETY Targets on the effectiveness of safety management, expressed as a level of implementation, Sweden ranging from European Aviation Safety Agency (‘EASA’) level A to D Air navigation service Safety management objective 2025 2026 2027 2028 2029 providers Safety policy and objectives C C C C C Safety risk management D D D D D LFV, ACR, AFAB, SDATS Safety assurance C C C C C Safety promotion C C C C C Safety culture C C C C C KEY PERFORMANCE AREA OF ENVIRONMENT Sweden 2025 2026 2027 2028 2029 Targets in the key performance area of environment,expressed as the 1,73 % 1,71 % 1,69 % 1,67 % 1,65 % average horizontal en route flight efficiency of the actual trajectory KEY PERFORMANCE AREA OF CAPACITY Sweden 2025 2026 2027 2028 2029 Targets in the key performance area of capacity, expressed in minutes 0,18 0,13 0,11 0,11 0,11 of en routeATFM delay per flight ELI: http://data.europa.eu/eli/dec/2025/1055/oj 7/8EN OJ L, 28.5.2025 KEY PERFORMANCE AREA OF COST-EFFICIENCY 2019 2024 En routecharging zone of baseline baseline 2025 2026 2027 2028 2029 Sweden value value Targets and baseline values SEK SEK SEK SEK SEK SEK SEK in the key performance area 585,33 766,73 724,19 691,88 672,80 661,87 645,00 of cost-efficiency,expressed as determined unit cost (in real EUR EUR EUR EUR EUR EUR EUR terms at 2022 prices) 55,10 72,17 68,17 65,13 63,33 62,30 60,71 8/8 ELI: http://data.europa.eu/eli/dec/2025/1055/oj

Continue your research