Home Europe European Commission Commission Decision (EU) 2025/1058 of 19 May 2025 on the con...
Date: 2025-05-28 Category: Not Applicable State: Union Government Country: Europe

Commission Decision (EU) 2025/1058 of 19 May 2025 on the consistency of the performance targets included in the draft performance plan submitted by Italy pursuant to Regulation (EC) No 549/2004 of the European Parliament and of the Council with the Union-wide performance targets for the fourth reference period of the Single European Sky performance and charging scheme (notified under document C(2025) 2928)

Issued by European Commission · Directorate-General for Mobility and Transport

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

## Policy Analysis Report: Commission Decision EU 2025/1058 Regarding Italian Performance Targets for the Single European Sky **1. Executive Summary:** This report analyzes Commission Decision EU 2025/1058, which assesses the consistency of Italy's draft performance plan for the fourth reference period (RP4, 2025-2029) of the Single European Sky (SES) performance and charging scheme with Union-wide performance targets. The decision concludes that the performance targets included in Italy's draft plan are, *in general*, consistent with the Union-wide targets set out in Implementing Decision EU 2024/1688. However, the report identifies some areas of concern, namely the measures for achievement of environmental targets and the capacity targets for terminal air navigation services, where Italy is expected to strengthen its commitment and justification, respectively. **2. Introduction:** The purpose of this report is to provide an informative analysis of Commission Decision EU 2025/1058 based solely on the text provided. The report will outline the policy's overview, background, key provisions, affected stakeholders, inferred implementation aspects, and expected outcomes. **3. Policy Overview:** This is a *new* policy (Commission Decision) that assesses a national plan in the context of a broader regulatory framework (Single European Sky). * **Core Objective(s):** Based on the provided text, the core objective is to ensure the consistency of Italy's national performance targets for air navigation services with the Union-wide performance targets for the Single European Sky's fourth reference period (2025-2029). This consistency is assessed across key performance areas: safety, environment, capacity, and cost-efficiency. **4. Background and Rationale:** The Single European Sky (SES) initiative aims to reform air traffic management in Europe, enhancing its safety, efficiency, capacity, and environmental performance. Member States are required to develop performance plans with targets consistent with Union-wide objectives. This policy addresses the need to ensure that national targets, as set by Italy, align with the broader European goals for air navigation services during the RP4. The decision examines whether Italy’s plan contributes appropriately to the overall SES performance objectives. **5. Key Provisions / Changes:** This policy establishes the assessment and conclusion regarding the consistency of Italy's draft performance plan with Union-wide targets. Specifically, the policy does the following: * **Safety:** Finds Italy's safety performance targets for air navigation service providers (ENAV and ITAF) generally consistent with Union-wide targets, noting measures for achievement are in place. * **Environment:** Finds Italy's environment targets (average horizontal en route flight efficiency) consistent with reference values from the European Route Network Improvement Plan (ERNIP). *However*, it expresses doubts regarding the adequacy of the measures proposed to achieve these targets, urging Italy to strengthen its commitment, particularly by implementing operational measures from the ERNIP and expediting cross-border free route airspace. * **Capacity:** Finds Italy's en route capacity targets (ATFM delay per flight) consistent with reference values from the Network Operations Plan. Notes measures are in place for achievement. * **Cost-Efficiency:** Finds Italy's en route cost-efficiency targets (determined unit cost - DUC) consistent with Union-wide targets, based on DUC trends and baseline values. * **Terminal Air Navigation Services (Capacity):** Expresses concerns regarding capacity performance targets for terminal air navigation services at airports. The proposed targets are higher (worse) than the past observed performance and the performance of similar airports. The policy requires Italy to justify or revise these targets. * **Terminal Air Navigation Services (Cost-Efficiency):** Finds Italy's cost-efficiency performance targets for terminal air navigation services do not give rise to concerns. The policy's *final decision* (Article 1) declares the Italian draft plan's performance targets are consistent with the Union-wide targets for RP4, conditional on addressing the issues outlined in the assessment. The Annex provides a list of the targets that were found to be consistent. **6. Target Audience and Stakeholders:** The primary target audience is the Italian government, specifically the entities responsible for air navigation services (ENAV and ITAF) and the development and implementation of the national performance plan. Other stakeholders include: * The European Commission, responsible for overseeing the implementation of the SES framework. * The Performance Review Body (PRB), assisting the Commission in assessing performance plans. * Airspace users and airlines operating within Italian airspace, as their operations are directly affected by the performance of air navigation services. * Airports, specifically Rome Fiumicino, Milan Malpensa and Milan Linate, due to concerns raised about their terminal capacity targets. **7. Implementation Aspects (Inferred):** * **Responsible agency/bodies:** The Italian government (specifically the entities responsible for air navigation services) is responsible for implementing the decision, which involves strengthening measures for achieving environmental targets and providing further justification or revising terminal capacity targets. The European Commission and PRB will likely monitor implementation. * **Timelines or procedures:** The text mentions that Italy should address the highlighted issues (environment measures and terminal capacity targets) in connection with the adoption of its *final* performance plan, as per Article 16(a) of Implementing Regulation EU 2019/317. Therefore, there is an implied deadline linked to the final plan's submission. **8. Expected Outcomes / Impact of Changes:** The likely intended outcomes are: * Improved environmental performance in Italian airspace, driven by a stronger commitment to operational measures from the ERNIP and the implementation of cross-border free route airspace. This requires specific action. * More realistic and justified capacity targets for terminal air navigation services at key Italian airports, potentially leading to reduced ATFM delays for arriving flights, or at minimum, a sound justification for why historical improvements cannot be sustained. * Ultimately, the policy aims to contribute to the overall objectives of the Single European Sky by ensuring that Italy's national performance targets are aligned with and contribute to Union-wide goals for safety, environment, capacity, and cost-efficiency. **9. Conclusion:** Commission Decision EU 2025/1058 plays a crucial role in ensuring the effective implementation of the Single European Sky framework. By assessing the consistency of Italy's draft performance plan, the decision contributes to the overall performance objectives of the SES. While the decision finds general consistency, it highlights the need for improvement in environmental measures and justification regarding terminal capacity targets. Addressing these concerns will be critical for Italy to fully contribute to the SES goals during the RP4.

Key Entities Referenced

European Route Network Improvement Plan (ERNIP): Plan drawn up in accordance with Annex I to Commission Implementing Regulation EU 2019/1236. Commission Implementing Regulation (EU) 2019/123: Commission Implementing Regulation laying down detailed rules for the implementation of air traffic management (ATM) network functions. Network Operations Plan: Plan drawn up in accordance with Article 9 of Commission Implementing Regulation EU 2019/123. Rome: City in Italy, location of an area control center. Milan: City in Italy, location of an area control center. Articles 13 and 4: Articles of Implementing Regulation EU 2019/317 related to airports. Rome Fiumicino: Airport in Rome, Italy. Milan Malpensa: Airport in Milan, Italy. Milan Linate: Airport in Milan, Italy. Article 16, point a: Article within Implementing Regulation EU 2019/317 related to adoption of final performance plan. Article 7: Article of Implementing Decision EU 2024/1688 related to comparator group. Italian Republic: The addressee of the decision. Brussels: Location where the decision was made. Apostolos TZITZIKOSTAS: Member of the Commission. European Union: A political and economic union of member states located primarily in Europe. L series 2025/1058: Reference to a specific series and number within the Official Journal of the European Union, likely a publication or document identifier. 28.5.2025: Date of publication in the Official Journal of the European Union. COMMISSION DECISION (EU) 2025/1058: Official title of the Commission Decision. 19 May 2025: Date of the Commission Decision. Italy: Member State of the European Union addressed by the decision. Regulation (EC) No 549/2004: Regulation of the European Parliament and of the Council establishing the framework for the creation of the single European sky. European Parliament: One of the legislative bodies of the European Union. Council: The Council of the European Union; a legislative body of the EU Single European Sky: An initiative to reform air traffic management in Europe. C(2025) 2928: Document number related to the notification of the decision. THE EUROPEAN COMMISSION: The executive branch of the European Union, responsible for the decision. Treaty on the Functioning of the European Union: One of the primary treaties of the European Union. Article 11(3) point c: Specific article and point within Regulation (EC) No 549/2004 providing the legal basis for the decision. Regulation (EU) 2024/2803: Regulation of the European Parliament and of the Council on the implementation of the Single European Sky. 23 October 2024: Date of Regulation (EU) 2024/2803. Article 5(8)(3): Specific article and paragraph within Regulation (EU) 2024/2803 providing the legal basis for the decision. Commission Implementing Regulation (EU) 2019/317: Commission regulation laying down a performance and charging scheme in the single European sky. 11 February 2019: Date of Commission Implementing Regulation (EU) 2019/317. Implementing Regulations (EU) No 390/2013 and (EU) No 391/2013: Regulations repealed by Commission Implementing Regulation (EU) 2019/317. Article 14(2): Specific article within Commission Implementing Regulation (EU) 2019/317 providing the legal basis for the decision. Member States: Refers to the countries that are part of the European Union. functional airspace blocks FABs: Airspace blocks established to improve air traffic management. RP4, 2025-2029: Fourth reference period of the performance and charging scheme, spanning from 2025 to 2029. Commission Implementing Decision (EU) 2024/1688: Commission decision setting Union-wide performance targets for the air traffic management network for the fourth reference period. 1 October 2024: Deadline for Member States to submit draft performance plans. 15 November 2024: Deadline for Member States to submit updated draft performance plans. Performance Review Body (PRB): Body assisting the Commission in the implementation of the performance scheme. Article 14(1): Article of Implementing Regulation EU 2019/317 regarding assessment of local performance targets. Annex IV: Annex IV to Implementing Regulation EU 2019/317 containing criteria for assessment. Regulation (EC) No 550/2004: Regulation of the European Parliament and of the Council on the provision of air navigation services in the single European sky. Article 15(2): Article within Regulation EC No 550/2004 related to cost allocation methodology. Article 22(5): Article within Implementing Regulation EU 2019/317 related to cost allocation methodology. EASA level A to D: Levels used to rate air navigation safety management effectiveness. ENAV: Air navigation service provider in Italy. ITAF: Provider of terminal air navigation services in Italy.
Official Source Record View Original Source →
See Full Document Text
Official Journal EN of the European Union L series 2025/1058 28.5.2025 COMMISSION DECISION(EU) 2025/1058 of 19 May 2025 on the consistency of the performance targets included in the draft performance plan submitted by Italy pursuant to Regulation (EC) No 549/2004 of the European Parliament and of the Council with the Union-wide performance targets for the fourth reference period of the Single European Sky performance and charging scheme (notified under document C(2025) 2928) (Only the Italian text is authentic) THE EUROPEAN COMMISSION, Having regard to the Treaty on the Functioning of the European Union, Having regard to Regulation (EC) No 549/2004 of the European Parliament and of the Council of 10 March 2004 laying down the framework for the creation of the single European sky (the framework Regulation)(1), and in particular Article 11(3) point (c) thereof, Having regard to Regulation (EU) 2024/2803 of the European Parliament and of the Council of 23 October 2024 on the implementation of the Single European Sky(2), and in particular Article 58(3) thereof, Having regard to Commission Implementing Regulation (EU) 2019/317 of 11 February 2019 laying down a performance and charging scheme in the single European sky and repealing Implementing Regulations (EU) No 390/2013 and (EU) No 391/2013(3), and in particular Article 14(2) thereof, Whereas: GENERAL CONSIDERATIONS (1) Pursuant to Article 11 of Regulation (EC) No 549/2004, Member States are to draw up plans, either at national level or at the level of functional airspace blocks (‘FABs’), including performance targets, for each reference period of the performance and charging scheme for air navigation services and network functions. Those plans are to include local performance targets which are consistent with the Union-wide performance targets for the reference period concerned. (2) The Union-wide performance targets for the fourth reference period (‘RP4’, 2025-2029) were set out in Commission Implementing Decision (EU) 2024/1688(4). (3) All Member States have drawn up and adopted draft performance plans for RP4, which were submitted to the Commission for assessment by 1 October 2024. Following the verification of completeness of those draft performance plans, the Commission requested Member States to submit updated draft performance plans by 15 November 2024. (4) The Commission’s assessment presented in this Decision is based on the updated draft performance plan for RP4 submitted by Italy (‘the draft performance plan’). (5) The Performance Review Body (‘PRB’), assisting the Commission in the implementation of the performance scheme, has submitted to the Commission a report containing its advice on the assessment of the draft performance plans. (1) OJ L 96, 31.3.2004, p. 1, ELI: http://data.europa.eu/eli/reg/2004/549/oj. (2) OJ L, 2024/2803, 11.11.2024, ELI: http://data.europa.eu/eli/reg/2024/2803/oj. (3) OJ L 56, 25.2.2019, p. 1, ELI: http://data.europa.eu/eli/reg_impl/2019/317/oj. (4) Commission Implementing Decision (EU) 2024/1688 of 12 June 2024 setting Union-wide performance targets for the air traffic management network for the fourth reference period from 1 January 2025 to 31 December 2029 (OJ L, 2024/1688, 17.6.2024, ELI: http://data.europa.eu/eli/dec_impl/2024/1688/oj). ELI: http://data.europa.eu/eli/dec/2025/1058/oj 1/8EN OJ L, 28.5.2025 (6) In accordance with Article 14(1) of Implementing Regulation (EU) 2019/317, the Commission has assessed the consistency of the local performance targets included in the draft performance plan on the basis of the criteria laid down in point 1 of Annex IV to that Implementing Regulation, and taking account of local circumstances where relevant. (7) The Commission has complemented its assessment of the draft performance plan with a review of the elements set out in point 2 of Annex IV to that Implementing Regulation. In respect of point 2.1(d)(vii) of Annex IV to Implementing Regulation (EU) 2019/317, the Commission notes that it has not conducted, as part of that review, a detailed analysis of the methodology used by Italy for the allocation of costs between en routeand terminal services in RP4. Therefore, the Commission has not drawn any conclusions, at this stage, in respect of the compliance of that cost allocation methodology with points (e) and (f) of Article 15(2) Regulation (EC) No 550/2004 of the European Parliament and of the Council(5)and Article 22(5) of Implementing Regulation (EU) 2019/317. COMMISSION ASSESSMENT Assessment of the safety targets (8) As regards the key performance area of safety, the consistency of the targets included in the draft performance plan has been assessed in accordance with point 1.1 of Annex IV to Implementing Regulation (EU) 2019/317. (9) The performance targets in the key performance area of safety proposed by Italy in respect of the effectiveness of safety management, broken down per safety management objective and expressed as a level of implementation, are as follows: Targets on the effectiveness of safety management, expressed as a level of implementation, Italy ranging from EASA level A to D Air navigation Safety management 2025 2026 2027 2028 2029 service provider objective Safety policy and C C C C C objectives Safety risk management C C C D D ENAV Safety assurance C C C C C Safety promotion C C C C C Safety culture C C C C C (10) The Commission has found that the safety performance targets proposed by Italy for the air navigation service provider ‘ENAV’ are equal to the Union-wide safety targets in respect of each calendar year of RP4, except for the ‘safety risk management’ objective for which the level of the Union-wide target is planned to be reached from year 2028 onwards. (11) The Commission notes that the draft performance plan sets out measures for ENAV for the achievement of the local safety targets, such as the development of a new Safety Plan aimed at enhancing safety resilience and improvements to the safety management system. (12) Furthermore, the safety performance targets included in the draft performance plan for the provider of terminal air navigation services ‘ITAF’ are also in line with the Union-wide performance targets in respect of year 2029. It is noted that Italy has set out measures for the achievement of those safety performance targets. (5) Regulation (EC) No 550/2004 of the European Parliament and of the Council of 10 March 2004 on the provision of air navigation services in the single European sky (the service provision Regulation) (OJ L 96, 31.3.2004, p. 10, ELI: http://data.europa.eu/eli/reg/ 2004/550/oj). 2/8 ELI: http://data.europa.eu/eli/dec/2025/1058/ojEN OJ L, 28.5.2025 (13) On the basis of the findings set out in recitals (9) to (12) and considering that the Union-wide safety performance targets set in Implementing Decision (EU) 2024/1688 are to be achieved by the final year of RP4, that is, 2029, the local safety performance targets included in the draft performance plan should be considered consistent with the Union-wide performance targets. Assessment of the environment targets (14) As regards the key performance area of environment, the consistency of the targets included in the draft performance plan regarding the average horizontal en routeflight efficiency of the actual trajectory has been assessed based on the criterion laid down in point 1.2 of Annex IV to Implementing Regulation (EU) 2019/317. Accordingly, the proposed environment targets of Italy have been compared to the relevant en routehorizontal flight efficiency reference values set out in the European Route Network Improvement Plan (‘ERNIP’), drawn up in accordance with Annex I to Commission Implementing Regulation (EU) 2019/123(6) and available at the time of adopting the Union-wide performance targets for RP4, that is on 2 July 2024. (15) The environment performance targets proposed by Italy for RP4 and the corresponding national reference values from the ERNIP, expressed as the average horizontal en routeflight efficiency of the actual trajectory, are as follows: Italy 2025 2026 2027 2028 2029 Targets in the key performance area of environment, expressed 2,75 % 2,70 % 2,67 % 2,64 % 2,61 % as the average horizontal en routeflight efficiency of the actual trajectory Reference values 2,75 % 2,70 % 2,67 % 2,64 % 2,61 % (16) The Commission observes that the environment targets proposed by Italy are equal to the corresponding national reference values for each calendar year of RP4. (17) On the basis of the findings set out in recitals (15) and (16), the targets in the key performance area of environment included in the draft performance plan should be considered consistent with the Union-wide performance targets for RP4. (18) However, having regard to the PRB’s findings, the Commission has doubts whether the measures presented by Italy in the draft performance plan for the achievement of the environment performance targets are adequate to enable those targets to be effectively reached. In particular, it is noted that Italy has not expressly committed, in the draft performance plan, to the implementation of the operational measures set out in the ERNIP. (19) Therefore, the Commission considers that, in connection with the adoption of its final performance plan in accordance with Article 16, point (a) of Implementing Regulation (EU) 2019/317, Italy should strengthen the measures for the achievement of its environment targets for RP4 presented in the draft performance plan, including by committing to all the operational measures set out in the ERNIP and expediting the implementation of cross- border free route airspace. (6) Commission Implementing Regulation (EU) 2019/123 of 24 January 2019 laying down detailed rules for the implementation of air traffic management (ATM) network functions and repealing Commission Regulation (EU) No 677/2011 (OJ L 28, 31.1.2019, p. 1, ELI: http://data.europa.eu/eli/reg_impl/2019/123/oj). ELI: http://data.europa.eu/eli/dec/2025/1058/oj 3/8EN OJ L, 28.5.2025 Assessment of the capacity targets (20) As regards the key performance area of capacity, the consistency of the targets included in the draft performance plan regarding the average en routeair traffic flow management (‘ATFM’) delay per flight has been assessed based on the criterion laid down in point 1.3 of Annex IV to Implementing Regulation (EU) 2019/317. Accordingly, the proposed en route capacity targets of Italy have been compared to the relevant reference values set out in the Network Operations Plan drawn up in accordance with Article 9 of Commission Implementing Regulation (EU) 2019/123 and available at the time of adopting the Union-wide performance targets for RP4, that is on 2 July 2024. (21) The en route capacity targets proposed by Italy for RP4, expressed in minutes of ATFM delay per flight, and the corresponding reference values from the Network Operations Plan, are as follows: Italy 2025 2026 2027 2028 2029 Targets in the key performance area of capacity, expressed in 0,28 0,20 0,13 0,13 0,13 minutes of en routeATFM delay per flight Reference values 0,28 0,20 0,13 0,13 0,13 (22) The Commission observes that the en routecapacity targets proposed by Italy are equal to the corresponding national reference values for each calendar year of RP4. (23) The Commission notes that Italy has presented, in the draft performance plan, measures for the achievement of the local en route capacity targets, which include organisational measures for a more efficient organisation of service provision, more flexible rostering arrangements, the implementation of enhanced cross-border procedures and the deployment of a new air traffic management system for the Rome and Milan area control centres. (24) On the basis of the findings set out in recitals (21), (22) and (23), the targets in the key performance area of capacity included in the draft performance plan should be considered consistent with the Union-wide performance targets for RP4. Review of the capacity targets for terminal air navigation services (25) In accordance with point 2.1(b) of Annex IV to Implementing Regulation (EU) 2019/317, the Commission has complemented its assessment of the draft performance plan by reviewing the capacity performance targets for terminal air navigation services set in respect of the airports referred to in Articles 1(3) and (4) of that Implementing Regulation. It was found that those targets give rise to concerns. (26) Firstly, the proposed RP4 targets on the average arrival ATFM delay, which are constant during RP4 at 0,35 minutes per flight, are significantly higher than the actual performance observed during the third reference period (‘RP3’), ranging from 0,03 to 0,28 minutes per flight. (27) Secondly, when breaking down the terminal capacity targets at airport level, it is observed that the capacity performance of terminal air navigation services at the airports of Rome Fiumicino, Milan Malpensa and Milan Linate is targeted to be significantly worse than the performance of similar airports identified by the PRB. (28) Therefore, the Commission considers that, in connection with the adoption of its final performance plan in accordance with Article 16, point (a) of Implementing Regulation (EU) 2019/317, Italy should further justify the terminal capacity targets for RP4 in light of the observations set out in recitals (26) to (27), or should revise downwards those targets. 4/8 ELI: http://data.europa.eu/eli/dec/2025/1058/ojEN OJ L, 28.5.2025 Assessment of the cost-efficiency targets (29) As regards the key performance area of cost-efficiency, the consistency of the targets included in the draft performance plan regarding the determined unit cost (‘DUC’) for en route air navigation services has been assessed based on the criteria laid down in points 1.4(a), (b) and (c) of Annex IV to Implementing Regulation (EU) 2019/317. Those criteria consist of the DUC trend over RP4, the long-term DUC trend over RP3 and RP4 (2020-2029), and the baseline value for the DUC at charging zone level compared with the average value of the charging zones where air navigation service providers have a similar operational and economic environment. (30) The en routecost-efficiency targets proposed by Italy for RP4, and the related baseline values, are as follows: 2019 2024 En routecharging zone of Italy baseline baseline 2025 2026 2027 2028 2029 value value Targets and baseline values in the key performance area EUR EUR EUR EUR EUR EUR EUR of cost-efficiency,expressed 68,94 56,66 56,51 55,67 55,30 54,45 53,37 as determined unit cost (in real terms at 2022 prices) (31) Concerning the assessment criterion set out in point 1.4(a) of Annex IV to Implementing Regulation (EU) 2019/317, the Commission observes that Italy’s DUC trend at charging zone level of - 1,2 % over RP4 is in line with the Union- wide trend of - 1,2 % over the same period. (32) Concerning the assessment criterion set out in point 1.4(b) of Annex IV to Implementing Regulation (EU) 2019/317, the Commission observes that Italy’s long-term DUC trend over RP3 and RP4 at charging zone level of - 2,8 % outperforms the long-term Union-wide trend of - 1,0 % over the same period. (33) Concerning the assessment criterion set out in point 1.4(c) of Annex IV to Implementing Regulation (EU) 2019/317, the Commission observes that Italy’s baseline value for the DUC of EUR 56,66 in real terms at 2022 prices (‘EUR2022’) is 11,1 % lower than the average baseline value of EUR 63,75 in EUR2022 of the relevant comparator group set out in Article 7 Implementing Decision (EU) 2024/1688. (34) On the basis of the findings set out in recitals (30) to (33), the targets in the key performance area of cost-efficiency included in the draft performance plan should be considered consistent with the Union-wide performance targets for RP4. Review of the cost-efficiency targets for terminal air navigation services (35) In accordance with point 2.1(c) of Annex IV to Implementing Regulation (EU) 2019/317, the Commission has complemented its assessment of the draft performance plan by reviewing the cost-efficiency performance targets for terminal air navigation services set in respect of the airports referred to in Articles 1(3) and (4) of that Implementing Regulation. It was found that those targets do not give rise to concerns. CONCLUSIONS (36) In the light of the foregoing, the performance targets included in the draft performance plan of Italy should be considered consistent with the Union-wide performance targets for RP4, ELI: http://data.europa.eu/eli/dec/2025/1058/oj 5/8EN OJ L, 28.5.2025 HAS ADOPTED THIS DECISION: Article 1 The performance targets included in the draft performance plan submitted by Italy for the fourth reference period (‘RP4’), listed in the Annex to this Decision, are consistent with the Union-wide performance targets for RP4 set out in Implementing Decision (EU) 2024/1688. Article 2 This Decision is addressed to the Italian Republic. Done at Brussels, 19 May 2025. For the Commission Apostolos TZITZIKOSTAS Member of the Commission 6/8 ELI: http://data.europa.eu/eli/dec/2025/1058/ojEN OJ L, 28.5.2025 ANNEX Performance targets included in the draft performance plan of Italy, found to be consistent with the Union-wide performance targets for the fourth reference period KEY PERFORMANCE AREA OF SAFETY Targets on the effectiveness of safety management, expressed as a level of implementation, Italy ranging from European Aviation Safety Agency (‘EASA’) level A to D Air navigation service Safety management objective 2025 2026 2027 2028 2029 providers Safety policy and objectives C C C C C Safety risk management C C C D D ENAV Safety assurance C C C C C Safety promotion C C C C C Safety culture C C C C C Safety policy and objectives B B B B C Safety risk management B B B B D ITAF Safety assurance B B B B C Safety promotion B B B B C Safety culture B B B B C KEY PERFORMANCE AREA OF ENVIRONMENT Italy 2025 2026 2027 2028 2029 Targets in the key performance area of environment,expressed as the 2,75 % 2,70 % 2,67 % 2,64 % 2,61 % average horizontal en route flight efficiency of the actual trajectory KEY PERFORMANCE AREA OF CAPACITY Italy 2025 2026 2027 2028 2029 Targets in the key performance area of capacity, expressed in minutes 0,28 0,20 0,13 0,13 0,13 of en routeATFM delay per flight ELI: http://data.europa.eu/eli/dec/2025/1058/oj 7/8EN OJ L, 28.5.2025 KEY PERFORMANCE AREA OF COST-EFFICIENCY 2019 2024 En routecharging zone of Italy baseline baseline 2025 2026 2027 2028 2029 value value Targets and baseline values in the key performance area EUR EUR EUR EUR EUR EUR EUR of cost-efficiency,expressed 68,94 56,66 56,51 55,67 55,30 54,45 53,37 as determined unit cost (in real terms at 2022 prices) 8/8 ELI: http://data.europa.eu/eli/dec/2025/1058/oj

Continue your research