Date: 2025-05-28Category: Not ApplicableState: Union GovernmentCountry: Europe
Commission Decision (EU) 2025/1059 of 19 May 2025 on the consistency of the performance targets included in the draft performance plan submitted by Portugal pursuant to Regulation (EC) No 549/2004 of the European Parliament and of the Council with the Union-wide performance targets for the fourth reference period of the Single European Sky performance and charging scheme (notified under document C(2025) 2929)
Issued by European Commission
· Directorate-General for Mobility and Transport
## Report on Commission Decision EU 2025/1059 Regarding Performance Targets for the Single European Sky in Portugal
**1. Executive Summary:**
This report analyzes Commission Decision EU 2025/1059, a decision concerning the consistency of Portugal's draft performance plan for the fourth reference period (RP4, 2025-2029) of the Single European Sky (SES) performance and charging scheme with Union-wide performance targets. The core purpose of this decision is to assess and ensure that Portugal's national performance targets for air navigation services align with the broader European objectives for safety, environment, capacity, and cost-efficiency. The Commission found that Portugal's proposed performance targets are consistent with the Union-wide targets for RP4.
**2. Introduction:**
This report provides an overview and analysis of Commission Decision EU 2025/1059 of May 19, 2025. The aim is to inform stakeholders about the key aspects of this decision, based solely on the information contained within the provided policy text.
**3. Policy Overview:**
This document constitutes a decision specifically addressing Portugal's performance plan. The core objective of the Single European Sky (SES) performance and charging scheme, inferred from the text, is to improve the efficiency, safety, capacity, and cost-effectiveness of air navigation services within the European Union. Commission Decision EU 2025/1059 ensures Portugal's national targets support these broader Union-wide objectives.
**4. Background and Rationale:**
This is not an amendment, but a specific decision regarding Portugal's draft performance plan. The underlying issue the broader Single European Sky initiative addresses is the fragmented nature of European airspace, leading to inefficiencies, delays, and increased costs. Commission Decision EU 2025/1059 aims to ensure that Portugal's performance plan contributes to resolving these issues within the framework of the fourth reference period (2025-2029).
**5. Key Provisions / Changes:**
This is a New Policy decision regarding assessment. The key actions mandated are:
* **Assessment of Safety Targets:** The Commission assessed Portugal's safety performance targets for air navigation service provider NAV Portugal, evaluating the effectiveness of safety management based on EASA levels. The safety targets should achieve the Unionwide safety targets by 2029.
* **Assessment of Environment Targets:** The Commission evaluated Portugal's environment targets, specifically the average horizontal en route flight efficiency of the actual trajectory, comparing them with reference values from the European Route Network Improvement Plan (ERNIP).
* **Assessment of Capacity Targets:** The Commission examined Portugal's capacity targets, focusing on the average en route air traffic flow management (ATFM) delay per flight, comparing them with reference values from the Network Operations Plan. Portugal should commit to all operational measures set out in the Network Operations Plan.
* **Assessment of Cost-Efficiency Targets:** The Commission assessed Portugal's cost-efficiency targets, specifically the determined unit cost (DUC) for en route air navigation services, considering the DUC trend over RP4, the long-term DUC trend over RP3 and RP4, and the baseline value for the DUC.
* **Terminal Air Navigation Services Review:** The Commission complemented its assessments by reviewing the capacity and cost-efficiency performance targets for terminal air navigation services at specific airports.
**6. Target Audience and Stakeholders:**
The primary target audience is the Portuguese government and air navigation service provider (NAV Portugal). Secondary stakeholders include airlines operating within Portuguese airspace, airport authorities, and the broader air transport industry.
**7. Implementation Aspects (Inferred):**
* **Responsible Agency/Bodies:** The European Commission is responsible for assessing the consistency of national performance plans. NAV Portugal is responsible for implementing the measures outlined in the performance plan to achieve the set targets. The Performance Review Body (PRB) assists the Commission.
* **Timelines/Procedures:** The decision relates to the fourth reference period (RP4), spanning from January 1, 2025, to December 31, 2029. Member states were required to submit updated draft performance plans by November 15, 2024.
**8. Expected Outcomes / Impact of Changes:**
The intended outcome of this decision is to ensure that Portugal's air navigation services contribute to the achievement of the Union-wide performance targets for RP4 in safety, environment, capacity, and cost-efficiency. By aligning national targets with European objectives, the decision aims to improve the overall performance of the Single European Sky. Specific measures implemented by NAV Portugal, such as increasing air traffic controllers and restructuring airspace, are expected to lead to increased capacity and reduced delays.
**9. Conclusion:**
Commission Decision EU 2025/1059 confirms the consistency of Portugal's performance targets for the Single European Sky's fourth reference period with Union-wide goals. This decision is significant because it reflects the European Commission's commitment to enhancing air navigation services across the EU through the Single European Sky initiative. The report supports industry's understanding of the requirements and expectations in the area.
Key Entities Referenced
European Union: The political and economic union of European countries.
L series 2025/1059: Official Journal publication number.
COMMISSION DECISION (EU) 2025/1059: Commission Decision number and type of act.
19 May 2025: Date of the Commission Decision.
Portugal: Member state subject to the decision regarding its draft performance plan.
Regulation (EC) No 549/2004: Regulation of the European Parliament and of the Council laying down the framework for the creation of the single European sky (the framework Regulation).
European Parliament: Legislative branch of the European Union.
Council: A branch of the European Union
Single European Sky: Initiative to reform air traffic management in Europe.
C(2025) 2929: Document number of the notification.
THE EUROPEAN COMMISSION: The executive branch of the European Union responsible for the decision.
Treaty on the Functioning of the European Union: Treaty establishing the framework for the EU's operation.
Article 11(3) point c: Specific article and point of Regulation EC No 549/2004 providing the legal basis for the decision.
Regulation (EU) 2024/2803: Regulation of the European Parliament and of the Council on the implementation of the Single European Sky.
Article 5(8)(3): Specific article and point of Regulation EU 2024/2803 providing the legal basis for the decision.
Commission Implementing Regulation (EU) 2019/317: Regulation laying down a performance and charging scheme in the single European sky.
Article 14(2): Specific article and point of Regulation EU 2019/317 providing the legal basis for the decision.
Implementing Regulations (EU) No 390/2013: Regulation repealed by Commission Implementing Regulation (EU) 2019/317.
Implementing Regulations (EU) No 391/2013: Regulation repealed by Commission Implementing Regulation (EU) 2019/317.
RP4, 2025-2029: Fourth reference period.
Commission Implementing Decision (EU) 2024/1688: Commission Implementing Decision setting Unionwide performance targets.
1 October 2024: Deadline for submitting draft performance plans.
15 November 2024: Deadline for submitting updated draft performance plans.
Performance Review Body (PRB): Body assisting the Commission in the implementation of the performance scheme.
Annex IV to Implementing Regulation (EU) 2019/317: Annex containing criteria for assessing consistency of performance targets.
Article 15(2) Regulation (EC) No 550/2004: Article relating to cost allocation methodology.
Regulation (EC) No 550/2004: Regulation of the European Parliament and of the Council on the provision of air navigation services in the single European sky (the service provision Regulation).
EASA level A to D: Levels of implementation for safety management.
NAV Portugal: Air navigation service provider in Portugal.
European Route Network Improvement Plan (ERNIP): Plan related to flight efficiency.
Commission Implementing Regulation (EU) 2019/1236: Regulation related to the European Route Network Improvement Plan ERNIP.
2 July 2024: Date when the Unionwide performance targets for RP4 were adopted.
Network Manager: Organization responsible for network functions.
en route air traffic flow management (ATFM): Metric related to capacity targets.
Network Operations Plan: Plan related to capacity targets.
Commission Implementing Regulation (EU) 2019/123: Regulation laying down detailed rules for the implementation of air traffic management (ATM) network functions.
Commission Regulation (EU) No 677/2011: Regulation repealed by Commission Implementing Regulation (EU) 2019/123.
Articles 13 and 4 of Implementing Regulation (EU) 2019/317: Articles related to terminal air navigation services.
determined unit cost (DUC): Metric related to cost-efficiency targets.
Apostolos TZITZIKOSTAS: Member of the Commission.
Portuguese Republic: The country to which this decision is addressed
Official Journal EN
of the European Union L series
2025/1059 28.5.2025
COMMISSION DECISION(EU) 2025/1059
of 19 May 2025
on the consistency of the performance targets included in the draft performance plan submitted by
Portugal pursuant to Regulation (EC) No 549/2004 of the European Parliament and of the Council
with the Union-wide performance targets for the fourth reference period of the Single European Sky
performance and charging scheme
(notified under document C(2025) 2929)
(Only the Portuguese text is authentic)
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EC) No 549/2004 of the European Parliament and of the Council of 10 March 2004 laying
down the framework for the creation of the single European sky (the framework Regulation)(1), and in particular
Article 11(3) point (c) thereof,
Having regard to Regulation (EU) 2024/2803 of the European Parliament and of the Council of 23 October 2024 on the
implementation of the Single European Sky(2), and in particular Article 58(3) thereof,
Having regard to Commission Implementing Regulation (EU) 2019/317 of 11 February 2019 laying down a performance
and charging scheme in the single European sky and repealing Implementing Regulations (EU) No 390/2013 and (EU)
No 391/2013(3), and in particular Article 14(2) thereof,
Whereas:
GENERAL CONSIDERATIONS
(1) Pursuant to Article 11 of Regulation (EC) No 549/2004, Member States are to draw up plans, either at national level
or at the level of functional airspace blocks (‘FABs’), including performance targets, for each reference period of the
performance and charging scheme for air navigation services and network functions. Those plans are to include local
performance targets which are consistent with the Union-wide performance targets for the reference period
concerned.
(2) The Union-wide performance targets for the fourth reference period (‘RP4’, 2025-2029) were set out in Commission
Implementing Decision (EU) 2024/1688(4).
(3) All Member States have drawn up and adopted draft performance plans for RP4, which were submitted to the
Commission for assessment by 1 October 2024. Following the verification of completeness of those draft
performance plans, the Commission requested Member States to submit updated draft performance plans by
15 November 2024.
(4) The Commission’s assessment presented in this Decision is based on the updated draft performance plan for RP4
submitted by Portugal (‘the draft performance plan’).
(5) The Performance Review Body (‘PRB’), assisting the Commission in the implementation of the performance scheme,
has submitted to the Commission a report containing its advice on the assessment of the draft performance plans.
(1) OJ L 96, 31.3.2004, p. 1, ELI: http://data.europa.eu/eli/reg/2004/549/oj.
(2) OJ L, 2024/2803, 11.11.2024, ELI: http://data.europa.eu/eli/reg/2024/2803/oj.
(3) OJ L 56, 25.2.2019, p. 1, ELI: http://data.europa.eu/eli/reg_impl/2019/317/oj.
(4) Commission Implementing Decision (EU) 2024/1688 of 12 June 2024 setting Union-wide performance targets for the air traffic
management network for the fourth reference period from 1 January 2025 to 31 December 2029 (OJ L, 2024/1688, 17.6.2024,
ELI: http://data.europa.eu/eli/dec_impl/2024/1688/oj).
ELI: http://data.europa.eu/eli/dec/2025/1059/oj 1/7EN
OJ L, 28.5.2025
(6) In accordance with Article 14(1) of Implementing Regulation (EU) 2019/317, the Commission has assessed the
consistency of the local performance targets included in the draft performance plan on the basis of the criteria laid
down in point 1 of Annex IV to that Implementing Regulation, and taking account of local circumstances where
relevant.
(7) The Commission has complemented its assessment of the draft performance plan with a review of the elements set
out in point 2 of Annex IV to that Implementing Regulation. In respect of point 2.1(d)(vii) of Annex IV to
Implementing Regulation (EU) 2019/317, the Commission notes that it has not conducted, as part of that review, a
detailed analysis of the methodology used by Portugal for the allocation of costs between en route and terminal
services in RP4. Therefore, the Commission has not drawn any conclusions, at this stage, in respect of the
compliance of that cost allocation methodology with points (e) and (f) of Article 15(2) Regulation (EC)
No 550/2004 of the European Parliament and of the Council(5) and Article 22(5) of Implementing Regulation
(EU) 2019/317.
COMMISSION ASSESSMENT
Assessment of the safety targets
(8) As regards the key performance area of safety, the consistency of the targets included in the draft performance plan
has been assessed in accordance with point 1.1 of Annex IV to Implementing Regulation (EU) 2019/317.
(9) The performance targets in the key performance area of safety proposed by Portugal in respect of the effectiveness of
safety management, broken down per safety management objective and expressed as a level of implementation, are as
follows:
Targets on the effectiveness of safety management, expressed as a level of implementation,
Portugal
ranging from EASA level A to D
Air navigation Safety management
2025 2026 2027 2028 2029
service provider objective
Safety policy and
C C C C C
objectives
Safety risk management C C C D D
NAV Portugal
Safety assurance C C C C C
Safety promotion C C C C C
Safety culture C C C C C
(10) The Commission has found that the safety performance targets proposed by Portugal for the air navigation service
provider ‘NAV Portugal’ are equal to the Union-wide safety targets for each calendar year from 2025 to 2029, except
for the ‘safety risk management’ objective for which the level of the Union-wide target is planned to be reached in
year 2029.
(11) The Commission notes that the draft performance plan sets out measures for NAV Portugal for the achievement of
the local safety targets, such as strengthening the role and staffing of internal units relevant to safety, and introducing
predictive tools and methodologies in safety management activities.
(5) Regulation (EC) No 550/2004 of the European Parliament and of the Council of 10 March 2004 on the provision of air navigation
services in the single European sky (the service provision Regulation) (OJ L 96, 31.3.2004, p. 10, ELI: http://data.europa.eu/eli/reg/
2004/550/oj).
2/7 ELI: http://data.europa.eu/eli/dec/2025/1059/ojEN
OJ L, 28.5.2025
(12) On the basis of the findings set out in recitals (9), (10) and (11) and considering that the Union-wide safety
performance targets set in Implementing Decision (EU) 2024/1688 must be achieved by the final year of RP4, that
is, 2029, the local safety performance targets included in the draft performance plan should be considered consistent
with the Union-wide performance targets.
Assessment of the environment targets
(13) As regards the key performance area of environment, the consistency of the targets included in the draft performance
plan regarding the average horizontal en routeflight efficiency of the actual trajectory has been assessed based on the
criterion laid down in point 1.2 of Annex IV to Implementing Regulation (EU) 2019/317. Accordingly, the proposed
environment targets of Portugal have been compared to the relevant en route horizontal flight efficiency reference
values set out in the European Route Network Improvement Plan (‘ERNIP’), drawn up in accordance with Annex I to
Commission Implementing Regulation (EU) 2019/123(6) and available at the time of adopting the Union-wide
performance targets for RP4, that is on 2 July 2024.
(14) The environment performance targets proposed by Portugal for RP4 and the corresponding national reference values
from the ERNIP, expressed as the average horizontal en routeflight efficiency of the actual trajectory, are as follows:
Portugal 2025 2026 2027 2028 2029
Targets in the key
performance area of
environment, expressed as
1,48 % 1,46 % 1,44 % 1,42 % 1,40 %
the average horizontal en
routeflight efficiency of the
actual trajectory
Reference values 1,48 % 1,46 % 1,44 % 1,42 % 1,40 %
(15) The Commission observes that the environment targets proposed by Portugal are equal to the corresponding national
reference values for each calendar year of RP4.
(16) The Commission notes that Portugal has presented in the draft performance plan measures for the achievement of
the local environment targets, which include cross-border free route airspace initiatives and a restructuring of the
airspace in collaboration with the Network Manager.
(17) On the basis of the findings set out in recitals (14), (15) and (16), the targets in the key performance area of
environment included in the draft performance plan should be considered consistent with the Union-wide
performance targets for RP4.
Assessment of the capacity targets
(18) As regards the key performance area of capacity, the consistency of the targets included in the draft performance plan
regarding the average en routeair traffic flow management (‘ATFM’) delay per flight has been assessed based on the
criterion laid down in point 1.3 of Annex IV to Implementing Regulation (EU) 2019/317. Accordingly, the proposed
en route capacity targets of Portugal have been compared to the relevant reference values set out in the Network
Operations Plan drawn up in accordance with Article 9 of Commission Implementing Regulation (EU) 2019/123
and available at the time of adopting the Union-wide performance targets for RP4, that is on 2 July 2024.
(6) Commission Implementing Regulation (EU) 2019/123 of 24 January 2019 laying down detailed rules for the implementation of air
traffic management (ATM) network functions and repealing Commission Regulation (EU) No 677/2011 (OJ L 28, 31.1.2019, p. 1,
ELI: http://data.europa.eu/eli/reg_impl/2019/123/oj).
ELI: http://data.europa.eu/eli/dec/2025/1059/oj 3/7EN
OJ L, 28.5.2025
(19) The en routecapacity targets proposed by Portugal for RP4, expressed in minutes of ATFM delay per flight, and the
corresponding reference values from the Network Operations Plan, are as follows:
Portugal 2025 2026 2027 2028 2029
Targets in the key
performance area of
capacity, expressed in 0,30 0,23 0,19 0,16 0,16
minutes of en routeATFM
delay per flight
Reference values 0,30 0,23 0,19 0,16 0,16
(20) The Commission observes that the en route capacity targets proposed by Portugal are equal to the corresponding
national reference values for each calendar year of RP4.
(21) The Commission notes that Portugal has presented, in the draft performance plan, measures for the achievement of
its en routecapacity targets. Those measures include a significant increase in the number of air traffic controllers in
operations at the area control centre, and a restructuring of airspace in order to enhance the available capacity and
mitigate the current capacity bottlenecks. Having regard to the findings of the PRB, the Commission considers that
Portugal should commit to the implementation of all the operational measures set out in the Network Operations
Plan, in order to support the achievement of its capacity performance targets for RP4.
(22) On the basis of the findings set out in recitals (19), (20) and (21), the targets in the key performance area of capacity
included in the draft performance plan should be considered consistent with the Union-wide performance targets
for RP4.
Review of the capacity targets for terminal air navigation services
(23) In accordance with point 2.1(b) of Annex IV to Implementing Regulation (EU) 2019/317, the Commission has
complemented its assessment of the draft performance plan by reviewing the capacity performance targets for
terminal air navigation services set in respect of the airports referred to in Articles 1(3) and (4) of that Implementing
Regulation. It was found that those targets do not give rise to concerns.
Assessment of the cost-efficiency targets
(24) As regards the key performance area of cost-efficiency, the consistency of the targets included in the draft
performance plan regarding the determined unit cost (‘DUC’) for en route air navigation services has been assessed
based on the criteria laid down in points 1.4(a), (b) and (c) of Annex IV to Implementing Regulation (EU) 2019/317.
Those criteria consist of the DUC trend over RP4, the long-term DUC trend over the third reference period (‘RP3’) and
RP4 (2020-2029), and the baseline value for the DUC at charging zone level compared with the average value of the
charging zones where air navigation service providers have a similar operational and economic environment.
4/7 ELI: http://data.europa.eu/eli/dec/2025/1059/ojEN
OJ L, 28.5.2025
(25) The en routecost-efficiency targets proposed by Portugal for RP4, and the related baseline values, are as follows:
2019 2024
En routecharging zone of
baseline baseline 2025 2026 2027 2028 2029
Portugal
value value
Targets and baseline values
in the key performance area
EUR EUR EUR EUR EUR EUR EUR
of cost-efficiency,expressed
38,15 37,42 36,94 36,92 36,48 35,27 33,71
as determined unit cost (in real
terms at 2022 prices)
(26) Concerning the assessment criterion set out in point 1.4(a) of Annex IV to Implementing Regulation (EU) 2019/317,
the Commission observes that Portugal’s DUC trend at charging zone level of - 2,1 % over RP4 outperforms the
Union-wide trend of - 1,2 % over the same period.
(27) Concerning the assessment criterion set out in point 1.4(b) of Annex IV to Implementing Regulation (EU) 2019/317,
the Commission observes that Portugal’s long-term DUC trend at charging zone level over RP3 and RP4 of - 1,4 %
outperforms the long-term Union-wide trend of - 1,0 % over the same period.
(28) Concerning the assessment criterion set out in point 1.4(c) of Annex IV to Implementing Regulation (EU) 2019/317,
the Commission observes that Portugal’s baseline value for the DUC of EUR 37,42 in real terms at 2022 prices
(‘EUR2022’) is +49,3 % higher than the average baseline value of EUR 25,06 in EUR2022 of the relevant comparator
group set out in Article 7 Implementing Decision (EU) 2024/1688.
(29) As specified in recitals (26) and (27), it is clear that Portugal outperforms the Union-wide DUC for RP4 by a
significant margin and also outperforms the long-term Union-wide DUC trend. Portugal thus demonstrates that
effective cost-efficiency gains are achieved both over the medium and long term. Therefore, the Commission
considers that the deviation between Portugal’s baseline value and the relevant comparator group referred to in
recital (28) does not preclude Portugal’s consistency with the Union-wide cost-efficiency performance targets.
(30) On the basis of the findings set out in recitals (25) to (29), the targets in the key performance area of cost-efficiency
included in the draft performance plan should be considered consistent with the Union-wide performance targets
for RP4.
Review of the cost-efficiency targets for terminal air navigation services
(31) In accordance with point 2.1(c) of Annex IV to Implementing Regulation (EU) 2019/317, the Commission has
complemented its assessment of the draft performance plan by reviewing the cost-efficiency performance targets for
terminal air navigation services set in respect of the airports referred to in Articles 1(3) and (4) of that Implementing
Regulation. It was found that those targets do not give rise to concerns.
CONCLUSIONS
(32) In the light of the foregoing, the performance targets included in the draft performance plan of Portugal should be
considered consistent with the Union-wide performance targets for RP4,
ELI: http://data.europa.eu/eli/dec/2025/1059/oj 5/7EN
OJ L, 28.5.2025
HAS ADOPTED THIS DECISION:
Article 1
The performance targets included in the draft performance plan submitted by Portugal for the fourth reference period
(‘RP4’), listed in the Annex to this Decision, are consistent with the Union-wide performance targets for RP4 set out in
Implementing Decision (EU) 2024/1688.
Article 2
This Decision is addressed to the Portuguese Republic.
Done at Brussels, 19 May 2025.
For the Commission
Apostolos TZITZIKOSTAS
Member of the Commission
6/7 ELI: http://data.europa.eu/eli/dec/2025/1059/ojEN
OJ L, 28.5.2025
ANNEX
Performance targets included in the draft performance plan of Portugal, found to be consistent with the Union-
wide performance targets for the fourth reference period
KEY PERFORMANCE AREA OF SAFETY
Targets on the effectiveness of safety management,expressed as a level of implementation,
Portugal
ranging from European Aviation Safety Agency (‘EASA’) level A to D
Air navigation service
Safety management objective 2025 2026 2027 2028 2029
provider
Safety policy and objectives C C C C C
Safety risk management C C C D D
NAV Portugal Safety assurance C C C C C
Safety promotion C C C C C
Safety culture C C C C C
KEY PERFORMANCE AREA OF ENVIRONMENT
Portugal 2025 2026 2027 2028 2029
Targets in the key
performance area of
environment,expressed as the
1,48 % 1,46 % 1,44 % 1,42 % 1,40 %
average horizontal en route
flight efficiency of the actual
trajectory
KEY PERFORMANCE AREA OF CAPACITY
Portugal 2025 2026 2027 2028 2029
Targets in the key
performance area of
capacity, expressed in minutes 0,30 0,23 0,19 0,16 0,16
of en routeATFM delay per
flight
KEY PERFORMANCE AREA OF COST-EFFICIENCY
2019 2024
En routecharging zone of
baseline baseline 2025 2026 2027 2028 2029
Portugal
value value
Targets and baseline values
in the key performance area
EUR EUR EUR EUR EUR EUR EUR
of cost-efficiency, expressed
38,15 37,42 36,94 36,92 36,48 35,27 33,71
as determined unit cost (in
real terms at 2022 prices)
ELI: http://data.europa.eu/eli/dec/2025/1059/oj 7/7