Date: 2025-05-28Category: Not ApplicableState: Union GovernmentCountry: Europe
Commission Decision (EU) 2025/1064 of 19 May 2025 on the consistency of the performance targets included in the draft performance plan submitted by Finland pursuant to Regulation (EC) No 549/2004 of the European Parliament and of the Council with the Union-wide performance targets for the fourth reference period of the Single European Sky performance and charging scheme (notified under document C(2025) 3005)
Issued by European Commission
· Directorate-General for Mobility and Transport
## Report on Commission Decision (EU) 2025/1064 Regarding Finnish Performance Targets for the Single European Sky
**1. Executive Summary:**
This report analyzes Commission Decision (EU) 2025/1064 of May 19, 2025, which assesses the consistency of Finland's performance targets for the fourth reference period (RP4, 2025-2029) of the Single European Sky (SES) performance and charging scheme with Union-wide targets. The Decision concludes that Finland's targets for safety, environment, capacity, and cost-efficiency are consistent with Union-wide objectives, particularly after accounting for the impact of the war in Ukraine on air traffic. This consistency is crucial for maintaining a harmonized and efficient European air traffic management (ATM) network.
**2. Introduction:**
The purpose of this report is to provide an informative overview of Commission Decision (EU) 2025/1064 regarding the assessment of Finland's performance targets for the Single European Sky's fourth reference period (RP4). This analysis is based solely on the provided text of the Commission Decision.
**3. Policy Overview:**
* This document is not an amendment. It is a decision regarding the assessment of Finland's performance targets.
* **Core Objective(s):** The core objective, as inferred from the text, is to ensure that Finland's national performance targets for air navigation services and network functions align with the Union-wide performance targets established for the fourth reference period (2025-2029) of the Single European Sky. This alignment is essential for the efficient and harmonized operation of the European air traffic management network.
**4. Background and Rationale:**
* **New Policy:** This Commission Decision addresses the need to ensure that Member States' performance plans contribute to the overall objectives of the Single European Sky (SES), primarily the improvement of safety, efficiency, capacity, and environmental performance of air traffic management. The text implies a system where national performance plans are assessed against Union-wide targets to achieve a coherent and optimized ATM network across Europe. This specific Decision focuses on Finland and the assessment of its submitted performance plan.
**5. Key Provisions / Changes:**
* This document establishes that the performance targets included in the draft performance plan submitted by Finland for the fourth reference period (RP4) are consistent with the Union-wide performance targets for RP4 set out in Implementing Decision EU 2024/1688. The document details the Commission's assessment across four key performance areas:
* **Safety:** The safety performance targets proposed by Finland for Fintraffic ANS are deemed consistent, aligning with Union-wide targets for the effectiveness of safety management. The target for safety risk management will be reached in year 2029.
* **Environment:** The environment targets proposed by Finland, expressed as average horizontal en route flight efficiency, are equal to the corresponding national reference values from the European Route Network Improvement Plan (ERNIP) for each calendar year of RP4.
* **Capacity:** The en route capacity targets proposed by Finland, expressed in minutes of ATFM delay per flight, are equal to the corresponding national reference values from the Network Operations Plan for each calendar year of RP4.
* **Cost-efficiency:** While Finland's initial DUC trend underperformed the Union-wide trend, the Commission recalculated the trend considering the structural loss of traffic due to the war in Ukraine. The adjusted DUC trend, along with a lower baseline value compared to the relevant comparator group, led to the conclusion that Finland's cost-efficiency targets are consistent.
**6. Target Audience and Stakeholders:**
Based on the text, the primary target audience and stakeholders include:
* **The Republic of Finland:** As the addressee of the Decision, Finland is directly responsible for ensuring its air navigation service provision aligns with the assessed performance targets.
* **Fintraffic ANS:** As the air navigation service provider in Finland, Fintraffic ANS is responsible for implementing the performance targets and related measures.
* **European Commission:** The Commission is responsible for assessing the consistency of Member States' performance plans with Union-wide targets.
* **Performance Review Body (PRB):** The PRB assists the Commission in implementing the performance scheme and provides advice on the assessment of performance plans.
* **The aviation industry:** The aviation industry in general is also a stakeholder, as the policy impacts the safety, efficiency, and cost of air navigation services.
**7. Implementation Aspects (Inferred):**
* **Responsible agency/bodies:** The key responsible body is Fintraffic ANS, the Finnish air navigation service provider, which must implement measures to achieve the defined targets. The European Commission, assisted by the PRB, oversees and monitors the implementation.
* **Timelines or procedures:** The decision concerns the fourth reference period (2025-2029). Finland is expected to adhere to the targets specified for each calendar year within this period.
* The text mentions specific measures that Fintraffic ANS will have to carry out to ensure the correct fulfillment of local safety and enviromental targets.
**8. Expected Outcomes / Impact of Changes:**
* The intended outcome of this Decision is to ensure that Finland's air navigation service provision contributes to the overall improvement of the European ATM network's performance. By aligning with Union-wide targets, Finland is expected to enhance safety, reduce environmental impact, improve capacity, and maintain cost-efficiency in its airspace. The decision also demonstrates a flexible approach to assessing cost-efficiency, taking into account unforeseen external factors like geopolitical events (war in Ukraine) that significantly impact traffic volumes.
**9. Conclusion:**
Commission Decision (EU) 2025/1064 confirms the consistency of Finland's performance targets for the Single European Sky's fourth reference period with Union-wide objectives. This decision is significant as it ensures that Finland's air navigation service provision aligns with the broader European ATM network's goals for safety, efficiency, capacity, and environmental sustainability. Furthermore, the Decision acknowledges and adjusts for the impact of external factors, such as the war in Ukraine, ensuring a fair and accurate assessment of Finland's cost-efficiency performance. This contributes to a more robust and adaptable European air traffic management system.
Key Entities Referenced
European Union: A political and economic union of member states located primarily in Europe.
L series 2025/1064: Reference to the official journal series and number of the European Union, specifically L series 2025/1064
28.5.2025: Date: May 28, 2025
COMMISSION DECISION (EU) 2025/1064: Official title of the Commission Decision.
19 May 2025: Date of the Commission Decision.
Finland: A Member State of the European Union to which the decision is addressed.
Regulation (EC) No 549/2004: Regulation of the European Parliament and of the Council laying down the framework for the creation of the single European sky (the framework Regulation).
European Parliament: One of the legislative bodies of the European Union.
Council: The Council of the European Union; one of the legislative bodies of the European Union
Unionwide performance targets: Performance targets set at the Union level for the Single European Sky performance and charging scheme.
Single European Sky: A European Commission initiative to reform air traffic management in Europe.
C(2025) 3005: Document number related to the notification.
Finnish: Refers to the Finnish language, one of the authentic texts of the decision.
Swedish: Refers to the Swedish language, one of the authentic texts of the decision.
THE EUROPEAN COMMISSION: The executive branch of the European Union.
Treaty on the Functioning of the European Union: One of the primary treaties of the European Union.
Article 11(3) point c: Specific article and point within Regulation (EC) No 549/2004 related to performance targets.
Regulation (EU) 2024/2803: Regulation of the European Parliament and of the Council on the implementation of the Single European Sky.
Article 5(8)(3): Specific article within Regulation (EU) 2024/2803 related to the Single European Sky.
23 October 2024: Date of Regulation (EU) 2024/2803.
Commission Implementing Regulation (EU) 2019/317: Commission Implementing Regulation laying down a performance and charging scheme in the single European sky.
11 February 2019: Date of Commission Implementing Regulation (EU) 2019/317.
Regulation (EU) No 390/2013: Implementing Regulations being repealed by Commission Implementing Regulation (EU) 2019/317.
Regulation (EU) No 391/2013: Implementing Regulations being repealed by Commission Implementing Regulation (EU) 2019/317.
Article 14(2): Specific article within Commission Implementing Regulation (EU) 2019/317.
Member States: Countries that are part of the European Union.
functional airspace blocks FABs: Airspace blocks established to improve air traffic management.
fourth reference period (RP4), 2025-2029: The time period covered by the performance and charging scheme.
Commission Implementing Decision (EU) 2024/1688: Commission Implementing Decision setting Unionwide performance targets for the air traffic management network for the fourth reference period.
1 October 2024: Date by which draft performance plans were submitted to the Commission.
15 November 2024: Date by which updated draft performance plans were to be submitted.
Performance Review Body (PRB): Body assisting the Commission in the implementation of the performance scheme.
Article 14(1): Article within Implementing Regulation EU 2019/317.
Annex IV: Annex to Implementing Regulation EU 2019/317 outlining criteria for assessing the consistency of performance targets.
Article 15(2): Article within Regulation EC No 550/2004.
Regulation (EC) No 550/2004: Regulation of the European Parliament and of the Council on the provision of air navigation services in the single European sky (the service provision Regulation).
effectiveness of safety management: A key performance area related to safety.
European Aviation Safety Agency (EASA): European Aviation Safety Agency. The range of level runs from A to D.
Fintraffic ANS: The air navigation service provider in Finland.
average horizontal en route flight efficiency: A key performance area related to the environment.
European Route Network Improvement Plan (ERNIP): Plan drawn up in accordance with Annex I to Commission Implementing Regulation EU 2019/1236.
2 July 2024: Date of adopting the Unionwide performance targets for RP4.
Commission Implementing Regulation (EU) 2019/1236: Regulations relating to the ERNIP
Norway: Country bordering Finland.
Latvia: Country bordering Finland.
Estonia: Country bordering Finland.
Denmark: Country bordering Finland.
Sweden: Country bordering Finland.
average en route air traffic flow management (ATFM) delay: A key performance area related to capacity.
Network Operations Plan: Plan drawn up in accordance with Article 9 of Implementing Regulation EU 2019/123
Commission Implementing Regulation (EU) 2019/123: Regulation laying down detailed rules for the implementation of air traffic management (ATM) network functions.
Commission Regulation (EU) No 677/2011: Regulation being repealed by Commission Implementing Regulation EU 2019/123.
Articles 13 and 4: Articles in Implementing Regulation EU 2019/317.
determined unit cost (DUC): A key performance area related to cost-efficiency.
third reference period (RP3), 2020-2029: The time period covered by the third performance and charging scheme.
en route charging zone of Finland: The charging zone for en route air navigation services in Finland.
Russia: Country involved in war against Ukraine.
Ukraine: Country involved in war against Russia.
Apostolos TZITZIKOSTAS: Member of the Commission.
Brussels: Location where decision was made
Republic of Finland: The addressee of this decision
Official Journal EN
of the European Union L series
2025/1064 28.5.2025
COMMISSION DECISION(EU) 2025/1064
of 19 May 2025
on the consistency of the performance targets included in the draft performance plan submitted by
Finland pursuant to Regulation (EC) No 549/2004 of the European Parliament and of the Council
with the Union-wide performance targets for the fourth reference period of the Single European Sky
performance and charging scheme
(notified under document C(2025) 3005)
(Only the Finnish and Swedish texts are authentic)
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EC) No 549/2004 of the European Parliament and of the Council of 10 March 2004 laying
down the framework for the creation of the single European sky (the framework Regulation)(1), and in particular
Article 11(3) point (c) thereof,
Having regard to Regulation (EU) 2024/2803 of the European Parliament and of the Council of 23 October 2024 on the
implementation of the Single European Sky(2), and in particular Article 58(3) thereof,
Having regard to Commission Implementing Regulation (EU) 2019/317 of 11 February 2019 laying down a performance
and charging scheme in the single European sky and repealing Implementing Regulations (EU) No 390/2013 and (EU)
No 391/2013(3), and in particular Article 14(2) thereof,
Whereas:
GENERAL CONSIDERATIONS
(1) Pursuant to Article 11 of Regulation (EC) No 549/2004, Member States are to draw up plans, either at national level
or at the level of functional airspace blocks (‘FABs’), including performance targets, for each reference period of the
performance and charging scheme for air navigation services and network functions. Those plans are to include local
performance targets which are consistent with the Union-wide performance targets for the reference period
concerned.
(2) The Union-wide performance targets for the fourth reference period (‘RP4’, 2025–2029) were set out in Commission
Implementing Decision (EU) 2024/1688(4).
(3) All Member States have drawn up and adopted draft performance plans for RP4, which were submitted to the
Commission for assessment by 1 October 2024. Following the verification of completeness of those draft
performance plans, the Commission requested Member States to submit updated draft performance plans by
15 November 2024.
(4) The Commission’s assessment presented in this Decision is based on the updated draft performance plan for RP4
submitted by Finland (‘the draft performance plan’).
(5) The Performance Review Body (‘PRB’), assisting the Commission in the implementation of the performance scheme,
has submitted to the Commission a report containing its advice on the assessment of the draft performance plans.
(1) OJ L 96, 31.3.2004, p. 1, ELI: http://data.europa.eu/eli/reg/2004/549/oj.
(2) OJ L, 2024/2803, 11.11.2024, ELI: http://data.europa.eu/eli/reg/2024/2803/oj.
(3) OJ L 56, 25.2.2019, p. 1, ELI: http://data.europa.eu/eli/reg_impl/2019/317/oj.
(4) Commission Implementing Decision (EU) 2024/1688 of 12 June 2024 setting Union-wide performance targets for the air traffic
management network for the fourth reference period from 1 January 2025 to 31 December 2029 (OJ L, 2024/1688, 17.6.2024, ELI:
http://data.europa.eu/eli/dec_impl/2024/1688/oj).
ELI: http://data.europa.eu/eli/dec/2025/1064/oj 1/8EN
OJ L, 28.5.2025
(6) In accordance with Article 14(1) of Implementing Regulation (EU) 2019/317, the Commission has assessed the
consistency of the local performance targets included in the draft performance plan on the basis of the criteria laid
down in point 1 of Annex IV to that Implementing Regulation, and taking account of local circumstances where
relevant.
(7) The Commission has complemented its assessment of the draft performance plan with a review of the elements set
out in point 2 of Annex IV to that Implementing Regulation. In respect of point 2.1(d)(vii) of Annex IV to
Implementing Regulation (EU) 2019/317, the Commission notes that it has not conducted, as part of that review, a
detailed analysis of the methodology used by Finland for the allocation of costs between en route and terminal
services in RP4. Therefore, the Commission has not drawn any conclusions, at this stage, in respect of the
compliance of that cost allocation methodology with points (e) and (f) of Article 15(2) Regulation (EC)
No 550/2004 of the European Parliament and of the Council(5) and Article 22(5) of Implementing Regulation
(EU) 2019/317.
COMMISSION ASSESSMENT
Assessment of the safety targets
(8) As regards the key performance area of safety, the consistency of the targets included in the draft performance plan
has been assessed in accordance with point 1.1 of Annex IV to Implementing Regulation (EU) 2019/317.
(9) The performance targets in the key performance area of safety proposed by Finland in respect of the effectiveness of
safety management, broken down per safety management objective and expressed as a level of implementation, are
as follows:
Targets on the effectiveness of safety management, expressed as a level of implementation,
Finland
ranging from EASA level A to D
Air navigation Safety management
2025 2026 2027 2028 2029
service provider objective
Safety policy and
C C C C C
objectives
Safety risk management C C C C D
Fintraffic ANS
Safety assurance C C C C C
Safety promotion C C C C C
Safety culture C C C C C
(10) The Commission observes that the safety performance targets proposed by Finland for the air navigation service
provider ‘Fintraffic ANS’ are equal to the Union-wide safety targets for each calendar year from 2025 to 2029, except
for the ‘safety risk management’ objective for which the level of the Union-wide target is planned to be reached in
year 2029.
(11) The Commission notes that the draft performance plan sets out measures for Fintraffic ANS for the achievement of
the local safety targets, such as defining acceptable levels of safety-related risks, improving the safety risk review
process and system investments supporting safety management functions.
(5) Regulation (EC) No 550/2004 of the European Parliament and of the Council of 10 March 2004 on the provision of air navigation
services in the single European sky (the service provision Regulation) (OJ L 96, 31.3.2004, p. 10, ELI http://data.europa.eu/eli/reg/
2004/550/oj).
2/8 ELI: http://data.europa.eu/eli/dec/2025/1064/ojEN
OJ L, 28.5.2025
(12) On the basis of the findings set out in recitals (9), (10) and (11), and considering that the Union-wide safety
performance targets set in Implementing Decision (EU) 2024/1688 are to be achieved by the final year of RP4, that
is, 2029, the local safety performance targets included in the draft performance plan should be considered consistent
with the Union-wide performance targets.
Assessment of the environment targets
(13) As regards the key performance area of environment, the consistency of the targets included in the draft performance
plan regarding the average horizontal en routeflight efficiency of the actual trajectory has been assessed based on the
criterion laid down in point 1.2 of Annex IV to Implementing Regulation (EU) 2019/317. Accordingly, the proposed
environment targets of Finland have been compared to the relevant en route horizontal flight efficiency reference
values set out in the European Route Network Improvement Plan (‘ERNIP’), drawn up in accordance with Annex I to
Commission Implementing Regulation (EU) 2019/123(6) and available at the time of adopting the Union-wide
performance targets for RP4, that is on 2 July 2024.
(14) The environment performance targets proposed by Finland for RP4 and the corresponding national reference values
from the ERNIP, expressed as the average horizontal en routeflight efficiency of the actual trajectory, are as follows:
Finland 2025 2026 2027 2028 2029
Targets in the key
performance area of
environment, expressed
3,38 % 3,37 % 3,36 % 3,35 % 3,34 %
as the average horizontal en
routeflight efficiency of the
actual trajectory
Reference values 3,38 % 3,37 % 3,36 % 3,35 % 3,34 %
(15) The Commission observes that the environment targets proposed by Finland are equal to the corresponding national
reference values for each calendar year of RP4.
(16) The Commission notes that Finland has presented in the draft performance plan measures for the achievement of the
local environment targets, which include the implementation of cross-border free route airspace with Norway, Latvia,
Estonia, Denmark and Sweden.
(17) On the basis of the findings set out in recitals (14), (15) and (16), the targets in the key performance area of
environment included in the draft performance plan should be considered consistent with the Union-wide
performance targets for RP4.
Assessment of the capacity targets
(18) As regards the key performance area of capacity, the consistency of the targets included in the draft performance plan
regarding the average en routeair traffic flow management (‘ATFM’) delay per flight has been assessed based on the
criterion laid down in point 1.3 of Annex IV to Implementing Regulation (EU) 2019/317. Accordingly, the proposed
en route capacity targets of Finland have been compared to the relevant reference values set out in the Network
Operations Plan drawn up in accordance with Article 9 of Implementing Regulation (EU) 2019/123 and available at
the time of adopting the Union-wide performance targets for RP4, that is on 2 July 2024.
(6) Commission Implementing Regulation (EU) 2019/123 of 24 January 2019 laying down detailed rules for the implementation of air
traffic management (ATM) network functions and repealing Commission Regulation (EU) No 677/2011 (OJ L 28, 31.1.2019, p. 1,
ELI: http://data.europa.eu/eli/reg_impl/2019/123/oj).
ELI: http://data.europa.eu/eli/dec/2025/1064/oj 3/8EN
OJ L, 28.5.2025
(19) The en route capacity targets proposed by Finland for RP4, expressed in minutes of ATFM delay per flight, and the
corresponding reference values from the Network Operations Plan, are as follows:
Finland 2025 2026 2027 2028 2029
Targets in the key
performance area of
capacity, expressed in 0,05 0,04 0,03 0,02 0,02
minutes of en routeATFM
delay per flight
Reference values 0,05 0,04 0,03 0,02 0,02
(20) The Commission observes that the en route capacity targets proposed by Finland are equal to the corresponding
national reference values for each calendar year of RP4.
(21) The Commission notes that Finland has presented, in the draft performance plan, measures for the achievement of
the local en routecapacity targets, in particular with regard to the airspace management and the management of peak
traffic demand situations.
(22) On the basis of the findings set out in recitals (19), (20) and (21), the targets in the key performance area of capacity
included in the draft performance plan should be considered consistent with the Union-wide performance targets
for RP4.
Review of the capacity targets for terminal air navigation services
(23) In accordance with point 2.1(b) of Annex IV to Implementing Regulation (EU) 2019/317, the Commission has
complemented its assessment of the draft performance plan by reviewing the capacity performance targets for
terminal air navigation services set in respect of the airports referred to in Articles 1(3) and (4) of that Implementing
Regulation. It was found that those targets do not give rise to concerns.
Assessment of the cost-efficiency targets
(24) As regards the key performance area of cost-efficiency, the consistency of the targets included in the draft
performance plan regarding the determined unit cost (‘DUC’) for en route air navigation services has been assessed
based on the criteria laid down in points 1.4(a), (b) and (c) of Annex IV to Implementing Regulation (EU) 2019/317.
Those criteria consist of the DUC trend over RP4, the long-term DUC trend over the third reference period (‘RP3’) and
RP4 (2020–2029), and the baseline value for the DUC at charging zone level compared with the average value of the
charging zones where air navigation service providers have a similar operational and economic environment.
(25) The en routecost-efficiency targets proposed by Finland for RP4, and the related baseline values, are as follows:
2019 2024
En routecharging zone of Finland baseline baseline 2025 2026 2027 2028 2029
value value
Targets and baseline values in
the key performance area of
EUR EUR EUR EUR EUR EUR EUR
cost-efficiency,expressed as
46,78 59,68 60,29 62,72 64,28 63,93 65,66
determined unit cost (in real
terms at 2022 prices)
4/8 ELI: http://data.europa.eu/eli/dec/2025/1064/ojEN
OJ L, 28.5.2025
(26) Concerning the assessment criterion set out in point 1.4(a) of Annex IV to Implementing Regulation (EU) 2019/317,
the Commission observes that Finland’s DUC trend at charging zone level of +1,9 % over RP4 underperforms the
Union-wide trend of - 1,2 % over the same period.
(27) Concerning the assessment criterion set out in point 1.4(b) of Annex IV to Implementing Regulation (EU) 2019/317,
the Commission observes that Finland’s long-term DUC trend at charging zone level over RP3 and RP4 of +3,8 %
underperforms the long-term Union-wide trend of - 1,0 % over the same period.
(28) The Commission notes, however, that Finland has lost, as a consequence of Russia’s war of aggression against
Ukraine, a significant share of the overflights which it historically used to serve. That traffic reduction continues
over RP4 to considerably impact the cost-efficiency performance of the air navigation service provider and has, in
particular, a negative effect on the long-term DUC trend of Finland.
(29) It is therefore necessary to examine, for the purpose of the assessment criterion referred to in recital (27), whether
Finland would meet the Union-wide long-term DUC trend in the absence of the circumstances referred to in
recital (28).
(30) To this end, the Commission has recalculated the long-term DUC trend in light of the estimated structural loss of
traffic for Finland as a consequence of the war in Ukraine, measured in en route service units. That recalculation
results in an adjusted long-term DUC trend for the Finland of - 1,3 %, which outperforms the long-term Union-wide
DUC trend of - 1,0 %. Therefore, it is concluded that Finland fulfils the assessment criterion referred to in recital (27)
after taking into account the effect of the significant traffic reduction resulting from the war in Ukraine.
(31) Concerning the assessment criterion set out in point 1.4(c) of Annex IV to Implementing Regulation (EU) 2019/317,
the Commission observes that Finland’s baseline value for the DUC of EUR 59,68 in real terms at 2022 prices
(‘EUR2022’) is 8,7 % lower than the average baseline value of EUR 65,36 in EUR2022 of the relevant comparator
group set out in Article 7 Implementing Decision (EU) 2024/1688.
(32) When excluding the negative impact of the traffic changes resulting from Russia’s war of aggression against Ukraine,
it is clear that Finland meets the long-term DUC trend. With reference to recital (31), Finland also demonstrates a
lower baseline value for the DUC compared to the average value of the relevant comparator group. Therefore, the
Commission considers that the deviation from the Union-wide DUC trend for RP4 referred to in recital (26) does not
preclude Finland’s consistency with the Union-wide cost-efficiency performance targets.
(33) On the basis of the findings set out in recitals (25) to (32), the targets in the key performance area of cost-efficiency
included in the draft performance plan should be considered consistent with the Union-wide performance targets
for RP4.
Review of the cost-efficiency targets for terminal air navigation services
(34) In accordance with point 2.1(c) of Annex IV to Implementing Regulation (EU) 2019/317, the Commission has
complemented its assessment of the draft performance plan by reviewing the cost-efficiency performance targets for
terminal air navigation services set in respect of the airports referred to in Articles 1(3) and (4) of that Implementing
Regulation. It was found that those targets do not give rise to concerns.
CONCLUSIONS
(35) In the light of the foregoing, the performance targets included in the draft performance plan of Finland should be
considered consistent with the Union-wide performance targets for RP4,
ELI: http://data.europa.eu/eli/dec/2025/1064/oj 5/8EN
OJ L, 28.5.2025
HAS ADOPTED THIS DECISION:
Article 1
The performance targets included in the draft performance plan submitted by Finland for the fourth reference period
(‘RP4’), listed in the Annex to this Decision, are consistent with the Union-wide performance targets for RP4 set out in
Implementing Decision (EU) 2024/1688.
Article 2
This Decision is addressed to the Republic of Finland.
Done at Brussels, 19 May 2025.
For the Commission
Apostolos TZITZIKOSTAS
Member of the Commission
6/8 ELI: http://data.europa.eu/eli/dec/2025/1064/ojEN
OJ L, 28.5.2025
ANNEX
Performance targets included in the draft performance plan of Finland, found to be consistent with
the Union-wide performance targets for the fourth reference period
KEY PERFORMANCE AREA OF SAFETY
Targets on the effectiveness of safety management, expressed as a level of implementation,
Finland
ranging from European Aviation Safety Agency (‘EASA’) level A to D
Air navigation service
Safety management objective 2025 2026 2027 2028 2029
provider
Safety policy and objectives C C C C C
Safety risk management C C C C D
Fintraffic ANS Safety assurance C C C C C
Safety promotion C C C C C
Safety culture C C C C C
KEY PERFORMANCE AREA OF ENVIRONMENT
Finland 2025 2026 2027 2028 2029
Targets in the key
performance area of
environment,expressed as the
3,38 % 3,37 % 3,36 % 3,35 % 3,34 %
average horizontal en route
flight efficiency of the actual
trajectory
KEY PERFORMANCE AREA OF CAPACITY
Finland 2025 2026 2027 2028 2029
Targets in the key
performance area of
capacity, expressed in minutes 0,05 0,04 0,03 0,02 0,02
of en routeATFM delay per
flight
ELI: http://data.europa.eu/eli/dec/2025/1064/oj 7/8EN
OJ L, 28.5.2025
KEY PERFORMANCE AREA OF COST-EFFICIENCY
2019 2024
En routecharging zone of
baseline baseline 2025 2026 2027 2028 2029
Finland
value value
Targets and baseline values
in the key performance area
EUR EUR EUR EUR EUR EUR EUR
of cost-efficiency,expressed
46,78 59,68 60,29 62,72 64,28 63,93 65,66
as determined unit cost (in
real terms at 2022 prices)
8/8 ELI: http://data.europa.eu/eli/dec/2025/1064/oj