15.7.2022 EN Official Journal of the European Union L 188/1
II
(Non-legislative acts)
REGULATIONS
COMMISSION DELEGATED REGULATION (EU) 2022/1214
of 9 March 2022
amending Delegated Regulation (EU) 2021/2139 as regards economic activities in certain energy
sectors and Delegated Regulation (EU) 2021/2178 as regards specific public disclosures for those
economic activities
(Text with EEA relevance)
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EU) 2020/852 of the European Parliament and of the Council of 18 June 2020 on the
establishment of a framework to facilitate sustainable investment, and amending Regulation (EU) 2019/2088(1), and in
particular Articles 8(4), 10(3) and 11(3) thereof,
Whereas:
(1) The technical screening criteria set out in Commission Delegated Regulation (EU) 2021/2139(2) cover
severaleconomic sectors and activities that have a potential to contribute to the Union climate change mitigation
and climate change adaptation objectives. Those economic sectors and activities were chosen because of their share
in overall greenhouse gas emissions, and their proven potential for avoiding the production of greenhouse gas
emissions, reducing such emissions, or removing such emissions. In addition, those economic sectors and activities
have a proven potential to enable such avoidance, reduction and removal for other economic sectors and activities,
or to ensure long-term storage of such emissions for other sectors and activities.
(2) The total energy use accounts for approximately 75 % of direct greenhouse gas emissions in the Union. Thus, the
energy sector has a crucial role in continuing to reduce greenhouse gas emissions. The technical screening criteria
laid down in Delegated Regulation (EU) 2021/2139 therefore cover a wide range of economic sectors and activities
related to the energy supply chain, ranging from electricity or heat generation from different sources, through
transmission and distribution networks to storage, as well as heat pumps and the manufacture of biogas and
biofuels. However, Delegated Regulation (EU) 2021/2139 does not contain technical screening criteria for
economic activities in the fossil gas and nuclear energy sectors, despite their potential to contribute to the
decarbonisation of the Union’s economy.
(3) As set out in Commission Communication of 21 April 2021 (‘EU Taxonomy, Corporate Sustainability Reporting,
Sustainability Preferences and Fiduciary Duties: Directing finance towards the European Green Deal’) and in
Commission Communication of 6 July 2021 (‘Strategy for Financing the Transition to a Sustainable Economy’),
theestablishment of technical screening criteria for energy generation from fossil gas was postponed in view of the
(1) OJ L 198, 22.6.2020, p. 13.
(2) Commission Delegated Regulation (EU) 2021/2139 of 4 June 2021 supplementing Regulation (EU) 2020/852 of the European
Parliament and of the Council by establishing the technical screening criteria for determining the conditions under which an economic
activity qualifies as contributing substantially to climate change mitigation or climate change adaptation and for determining whether
that economic activity causes no significant harm to any of the other environmental objectives (OJ L 442, 9.12.2021, p. 1).L 188/2 EN Official Journal of the European Union 15.7.2022
need for further technical assessment, notably on the transitional role of fossil gas in the decarbonisation of the
economy(3). The establishment of technical screening criteria for nuclear energy generation activities was also
postponed awaiting an in-depth expert assessment, launched in 2020, of whether the nuclear life-cycle, and notably
nuclear waste, could be considered compatible with the requirement, laid down in Article 17 of Regulation (EU)
2020/852, that an activity can do no significant harm to other environmental objectives. In the light of those
assessments, it is necessary to recognise that the fossil gas and nuclear energy generation activities can contribute to
the decarbonisation of the Union’s economy.
(4) In accordance with Article 10(2) of Regulation (EU) 2020/852 covering transitional economic activities, it is
necessary to lay down technical screening criteria for electricity generation, high-efficiency co-generation of power
and heat/cool, and production of heat/cool in efficient district heating and cooling systems from fossil gas, where
greenhouse gas emissions from fossil gas are below an appropriate threshold. In addition, it is necessary to lay down
technical screening criteria for the use of fossil gas in electricity generation, high-efficiency co-generation of power
and heat/cool, and production of heat/cool in efficient district heating and cooling systems, where such electricity
generation, high-efficiency co-generation of power and heat/cool, and production of heat/cool in efficient district
heating and cooling systems do not yet comply with that appropriate threshold, as in addition to the use of climate-
neutral energy and more investments in already low-carbon economic activities and sectors, the transition requires
substantial reductions in greenhouse gas emissions in other economic activities and sectors for which there are no
technologically and economically feasible low-carbon alternatives. All those economic activities should be qualified
as transitional under Article 10(2) of Regulation (EU) 2020/852, given that technologically and economically
feasible low-carbon alternatives may not yet be commercially available at a sufficient scale to cover the energy
demand in a continuous and reliable manner. In particular, for electricity generation, it is appropriate to provide for
an alternative approach to directly limiting the greenhouse gas emissions. Under this alternative approach, that
should deliver similar results over a 20 years period, facilities may reach such results by limiting the number of
hours in operation or by advancing the switch to renewable or low-carbon gases to an earlier date. The technical
screening criteria should facilitate an accelerated phase-out from more emissions-intensive energy sources,
including solid fossil fuels. In addition, in order to fulfil the requirements laid down in Article 10(2), first
subparagraph, points (a), (b) and (c), of Regulation (EU) 2020/852, the technical screening criteria for the use of
fossil gas should also ensure that robust evidence is available to demonstrate that the same energy capacity cannot
be generated with renewable sources, and that effective plans are put in place for each facility, in line with the best
performance in the sector, to switch entirely to renewables or low carbon gases by a specific date. Finally, the
technical screening criteria should provide for a time-limited recognition of the contribution of those activities to
decarbonisation.
(5) Renewables will play a fundamental role in meeting the climate and environmental goals of the Union. In that light,
investments in renewables need to scale-up to meet the needs of the energy market of the Union for more renewable
and clean energy.
(6) Nuclear energy-related activities are low-carbon activities, they do not constitute energy from renewable sources as
defined in Article 2, second subparagraph, point (1) of Directive (EU) 2018/2001 of the European Parliament and
of the Council(4), and as referred to in Article 10(1), point (a) of Regulation (EU) 2020/852 and do not fall under
the other categories of economic activities listed in points (b) to (i) of that provision. Such nuclear energy related
economic activities should be qualified under Article 10(2) of Regulation (EU) 2020/852, in the absence of
technologically and economically feasible low-carbon alternative at a sufficient scale to cover the energy demand in
a continuous and reliable manner. In addition, in the Final Report of the Technical Expert Group on Sustainable
Finance from March 2020(5), it was stated that ‘nuclear energy generation has near to zero green-house gas
emissions in the energy generation phase’ and ‘evidence on the potential substantial contribution of nuclear energy
to climate change mitigation objectives was extensive and clear’. Moreover, a number of Member States’ plans
include nuclear energy along with renewable energy in the energy sources to be used to meet climate targets,
(3) Communication from the Commission of 21 April 2021 to the European Parliament, the Council, the European Economic and Social
Committee and the Committee of the Regions, EU Taxonomy, Corporate Sustainability Reporting, Sustainability Preferences and
Fiduciary Duties: Directing finance towards the European Green Deal (COM(2021) 188 final) and Communication from the
Commission of 6 July 2021 to the European Parliament, the Council, the European Economic and Social Committee and the
Committee of the Regions, Strategy for Financing the Transition to a Sustainable Economy (COM(2021) 390 final).
(4) Directive (EU) 2018/2001 of the European Parliament and of the Council of 11 December 2018 on the promotion of the use of energy
from renewable sources (OJ L 328, 21.12.2018, p. 82).
(5) The TEG report available on: https://ec.europa.eu/info/sites/default/files/business_economy_euro/banking_and_finance/documents/
200309-sustainable-finance-teg-final-report-taxonomy_en.pdf15.7.2022 EN Official Journal of the European Union L 188/3
including the 2050 decarbonisation objective set out in Regulation (EU) 2021/1119 of the European Parliament and
of the Council(6). Finally, by providing a stable baseload of energy supply, nuclear energy facilitates the deployment
of intermittent renewable sources and does not hamper their development, as required by Article 10(2), point (b), of
Regulation (EU) 2020/852. Nuclear energy related activities should therefore be considered as complying with
Article 10(2) of Regulation (EU) 2020/852.
(7) Scientific review conducted by experts(7) concluded that technical screening criteria for nuclear energy related
economic activities should ensure that no significant harm is done to other environmental objectives due to
potential risks arising from the long-term storageand final disposal of nuclear waste. Those technical screening
criteria should therefore reflect the highest standards of nuclear safety, radiation protection and radioactive waste
management, building upon requirements laid down in the Treaty establishing the European Atomic Energy
Community (‘Euratom Treaty’) and in legislation adopted under that Treaty, and in particular in Council Directive
2009/71/Euratom(8). That Directive contains a high-level nuclear safety objective covering all stages of the life-
cycle of each nuclear installation, including the siting, design, construction, commissioning, operation and
decommissioning of such installations. In particular, that Directive calls for significant safety enhancements in the
design of new reactors, including the so-called Generation III+ reactors, for which state of the art knowledge and
technology should be used, taking into account the latest international safety requirements. Those requirements
provide for an effective implementation of the nuclear safety objective, including the application of the defence-in-
depth principle and of an effective safety culture. Those requirements ensure that the impact of extreme human-
made and natural hazards, including earthquakes and floods, is minimised and that accidents, abnormal operations
and failures or loss of control systems are prevented, inter alia, by protective structures or back-up cooling and
electricity supply systems.
(8) Accident-tolerant fuel for nuclear power plants which provides additional protection against accidents resulting
from structural damages to fuel or reactor components has become available in the market. In order to take into
account those recent technological developments, the use of that type of fuel should be set out as a requirement in
the technical screening criteria, taking into account its licensing within the Union.
(9) Worldwide, research and development efforts are ongoing to develop new nuclear reactor technologies that use,
among others, closed fuel cycles or fuel self-breeding concepts and that minimise the production of high-level
radioactive waste (‘Generation IV reactors’). Although those Generation IV reactors are not yet commercially viable,
technical screening criteria should be laid down for such reactors in light of their potential contribution to the
objective of decarbonisation and minimisation of radioactive waste.
(10) Nuclear energy is part of the future energy sources in a number of Member States, as part of their decarbonisation
efforts. The scenarios assessed by the Commission lead to a decarbonised energy system based on renewables to a
very large extent and on nuclear energy with a stable installed capacity compared to current levels. As the nuclear
installations being currently exploited age, they need safety upgrades to extend operational life as well as newly built
nuclear installations to replace obsolete installations. This is a continuous process that should ensure the availability
of the necessary capacity for the decarbonisation of the energy system by 2050 and beyond this date as needed.
Accordingly, significant investments in nuclear energy will be needed throughout the period until 2050 and
beyond. It is necessary to ensure that new nuclear power plants use the most advanced solutions resulting from
technological progress. The technical screening criteria for such new nuclear power plants should therefore provide
for regular reviews of each investment project, and for technical parameters that correspond to the best-available
technology in view of the outcomes of sustained research and development efforts and the continuous
improvements of technologies. Specific dates should be defined to ensure phasing in of new technologies
compatible with sustainable decarbonisation as soon as they become available.
(6) Regulation (EU) 2021/1119 of the European Parliament and of the Council of 30 June 2021 establishing the framework for achieving
climate neutrality and amending Regulations (EC) No 401/2009 and (EU) 2018/1999 (‘European Climate Law’) (OJ L 243, 9.7.2021,
p. 1).
(7) JRC report: Technical assessment of nuclear energy with respect to the ‘do no significant harm’ criteria of Regulation (EU) 2020/852
(‘Taxonomy Regulation’) available on: https://ec.europa.eu/info/file/210329-jrc-report-nuclear-energy-assessment_en
(8) Council Directive 2009/71/Euratom of 25 June 2009 establishing a Community framework for the nuclear safety of nuclear
installations (OJ L 172, 2.7.2009, p. 18).L 188/4 EN Official Journal of the European Union 15.7.2022
(11) Annex II to the Euratom Treaty and Council Regulation (Euratom) No 2587/1999(9)establish thresholds and other
requirements for the notification to the Commission of investments in nuclear energy. To ensure, for the purpose of
meeting the goals of the taxonomy, the highest possible regard to the principles and requirements of the Euratom
legislation, including the nuclear safety objective, such investments should be subject to an opinion from the
Commission, irrespective of whether Annex II to the Euratom Treaty and Regulation (Euratom) No 2587/1999
require any notification. For the same reason, all issues concerning the application of Article 10(2) and Article 17
of Regulation (EU) 2020/852 and the technical screening criteria identified by the Commission in its opinion
should be satisfactorily addressed.
(12) In view of the long lead times for investments in new nuclear generation capacity, extending the service time of
selected existing nuclear installations can support the decarbonisation of the energy system in the near to medium
term. The technical screening criteria for such extensions should, however, require modifications and safety
upgrades to ensure that those nuclear installations comply with the highest achievable safety standards and with all
safety objective requirements laid down in legislation adopted under the Euratom Treaty.
(13) In the light of the expected technological and scientific developments, investments in the construction and safe
operation of new nuclear installations using best available technologies and approved by an appropriate date by
Member States’ competent authorities in accordance with applicable national law should be subject to technical
screening criteria and to time-limits that will encourage the development and future use of Generation IV reactors
with closed fuel cycle or fuel self-breeding once they become commercially available. These time-limits should be
appropriately reviewed in light of progress in the development of such technologies.
(14) The technical screening criteria related to climate change mitigation or climate change adaptation objectives should
ensure that economic activities do not cause significant harm to any of the other environmental objectives.
Specifically for nuclear energy related economic activities, it is necessary to ensure that the long term disposal of
waste does not cause significant and long-term harm to the environment, as referred to in Article 17(1), point (d)
(iii), of Regulation (EU) 2020/852. It is therefore appropriate to set out in the technical screening criteria specific
requirements for a radioactive waste management fund and a nuclear decommissioning fund, which can be
combined, in line with the principle that waste generators should be responsible for the cost of managing it, and to
require operational final disposal facilities for all radioactive waste, which should prevent any export of radioactive
waste for disposal in third countries. In several Member States, low and intermediate level radioactive waste is
currently being disposed of in near-surface disposal facilities already, and substantial experience and know-how in
waste management have been accumulated during decades of operating those near-surface disposal facilities. For
high-level radioactive waste and spent fuel, deep geological disposal represents the state of the art solution that is
broadly accepted in the expert community worldwide as the safest and the most sustainable option for the end
point of the management of high-level radioactive waste and spent fuel considered as waste. Member States, while
retaining responsibility for their policies in respect of the management of their spent fuel and low, intermediate or
high-level radioactive waste, should include planning and implementation of disposal options in their national
policies, in particular under the national programmes for the management of spent fuel and radioactive waste,
covering all types of spent fuel and radioactive waste and all stages of spent fuel and radioactive waste management
from generation to disposal. The national programmes’ content is specified in Council Directive
2011/70/Euratom(10) and includes key performance indicators to monitor progress transparently. The Member
States have to report regularly on the progress of implementation of the national programmes to the Commission.
Reporting from Member States from 2021 demonstrates that substantial progress is made in the realisation of the
first deep geological disposal facilities on the Union territory. Realistic solutions are becoming available for Member
States to develop and operate such facilities by 2050. Therefore, the inclusion of a corresponding requirement in the
technical screening criteria ensures that no significant harm is caused to the environment.
(9) Council Regulation (Euratom) No 2587/1999 of 2 December 1999 defining the investment projects to be communicated to the
Commission in accordance with Article 41 of the Treaty establishing the European Atomic Energy Community (OJ L 315, 9.12.1999,
p. 1).
(10) Council Directive 2011/70/Euratom of 19 July 2011 establishing a Community framework for the responsible and safe management
of spent fuel and radioactive waste (OJ L 199, 2.8.2011, p. 48).15.7.2022 EN Official Journal of the European Union L 188/5
(15) It is necessary that non-financial and financial undertakings provide investors with a high degree of transparency
concerning their investments in fossil gas and nuclear energy generation activities for which technical screening
criteria should be laid down. To provide that transparency, specific disclosure requirements for non-financial and
financial undertakings should be laid down. In order to ensure comparability of the information disclosed to
investors, that information should be presented in the form of a template that indicates clearly the proportion of
fossil gas and nuclear energy activities in the denominator and, where appropriate, the numerator of key
performance indicators of those undertakings. In order to provide a high degree of transparency to investors in
financial products referred to in Article 5 and Article 6 of Regulation (EU) 2020/852 concerning exposures to fossil
gas and nuclear energy activities, for which technical screening criteria are laid down, the Commission will amend or
propose to amend the disclosure framework pertaining to those financial products as appropriate to provide for full
transparency over the whole life of those financial products. To ensure that such information is clearly identified by
end-investors, the Commission will consider amending the requirements on the financial and insurance advice given
by distributors.
(16) To enhance investor confidence, compliance with the technical screening criteria related to fossil gas activities should
be verified by an independent third party. To ensure an impartial and diligent verification of compliance, the
independent third-party should have the resources and expertise to perform that verification, be independent to
avoid any conflict of interest with the owner or the funder, and should not be involved in the development or
operation of such fossil gas activities. In addition to the verification mechanism, financial and non-financial
undertakings may be subject to specific verification requirements provided in other Union legislation on sustainable
finance that cover compliance with the technical screening criteria. In accordance with Article 26(1), point (c), of
Regulation (EU) 2020/852, the Commission should review the provisions required for setting up verification
mechanisms of compliance with the criteria set out in that Regulation.
(17) The fossil gas and nuclear energy sectors are characterised by rapid technological development. It is therefore
necessary to review the technical screening criteria covering energy generation activities in those sectors regularly,
as required by Article 19(5) of Regulation (EU) 2020/852. In addition, based on the conditions laid down in Article
10(2) of Regulation (EU) 2020/852, such review should cover the appropriateness of the periods of time laid down
in the technical screening criteria.
(18) Delegated Regulation (EU) 2021/2139 and Commission Delegated Regulation (EU) 2021/2178(11)should therefore
be amended accordingly. The amendments to Delegated Regulation (EU) 2021/2139 and Delegated Regulation (EU)
2021/2178 do not mandate any investments, but are intended to help financial markets and investors to identify,
subject to strict conditions, relevant gas and nuclear related activities needed for the transition of the Member States’
energy systems towards climate neutrality in line with Union climate goals and commitments.
(19) The amendments to Delegated Regulation (EU) 2021/2139 and Delegated Regulation (EU) 2021/2178 laid down in
this Delegated Regulation are closely linked. In order to ensure coherence between those provisions, which should
enter into force at the same time to facilitate a comprehensive view of the legal framework for stakeholders and to
facilitate the application of Regulation (EU) 2020/852, it is necessary to include those provisions in a single
Regulation.
(20) It is necessary to provide non-financial and financial undertakings with sufficient time to assess whether their
economic activities related to fossil gas and nuclear energy comply with the technical screening criteria laid down in
this Regulation, and to report on the basis of that assessment in accordance with Delegated Regulation (EU)
2021/2178. The date of application of this Regulation should therefore be deferred to 1 January 2023,
(11) Commission Delegated Regulation (EU) 2021/2178 of 6 July 2021 supplementing Regulation (EU) 2020/852 of the European
Parliament and of the Council by specifying the content and presentation of information to be disclosed by undertakings subject to
Articles 19a or 29a of Directive 2013/34/EU concerning environmentally sustainable economic activities, and specifying the
methodology to comply with that disclosure obligation (OJ L 443, 10.12.2021, p. 9).L 188/6 EN Official Journal of the European Union 15.7.2022
HAS ADOPTED THIS REGULATION:
Article 1
Amendments to Delegated Regulation (EU) 2021/2139
Delegated Regulation (EU) 2021/2139 is amended as follows:
(1) the following Article 2a is inserted:
‘Article 2a
Review
When performing the review referred to in Article 19(5) of Regulation (EU) 2020/852, the Commission shall also
review and assess the necessity to amend the dates referred to in Annex I, Section 4.27, Section 4.28, Section 4.29,
point 1(b), Section 4.30, point 1(b) and Section 4.31, point 1(b).
Any review of the date referred to in point (2) of Sections 4.27 and 4.28 to Annex I shall take into account the technical
progress in accident-tolerant fuel commercialisation in the Union and worldwide.’;
(2) Annex I is amended in accordance with Annex I to this Regulation;
(3) Annex II is amended in accordance with Annex II to this Regulation.
Article 2
Amendments to Delegated Regulation (EU) 2021/2178
Delegated Regulation (EU) 2021/2178 is amended as follows:
(1) in Article 8, the following paragraphs 6, 7 and 8 are added:
‘6. Non-financial undertakings and financial undertakings shall disclose the amount and proportion of:
(a) the taxonomy-aligned economic activities referred to in Sections 4.26, 4.27 and 4.28 of Annexes I and II to
Delegated Regulation (EU) 2021/2139 in the denominator and the numerator of their key performance indicators;
(b) the taxonomy-eligible, but not taxonomy-aligned, economic activities referred to in Sections 4.26, 4.27 and 4.28
of Annexes I and II to Delegated Regulation (EU) 2021/2139 in the denominator of their key performance
indicators;
(c) the taxonomy-non-eligible nuclear energy related activities in the denominator of their key performance indicators.
7. Non-financial undertakings and financial undertakings shall disclose the amount and proportion of:
(a) the taxonomy-aligned economic activities referred to in Sections 4.29, 4.30 and 4.31 of Annexes I and II to
Delegated Regulation (EU) 2021/2139 in the denominator and the numerator of their key performance indicators;
(b) the taxonomy-eligible, but not taxonomy-aligned, economic activities referred to in Sections 4.29, 4.30 and 4.31
of Annexes I and II to Delegated Regulation (EU) 2021/2139 in the denominator of their key performance
indicators;
(c) the taxonomy-non-eligible fossil gas related activities in the denominator of their key performance indicators.
8. The information referred to in paragraphs 6 and 7 shall be presented in tabular form by using the templates set
out in Annex XII to this Regulation.’;
(2) the text set out in Annex III to this Regulation is added as Annex XII.15.7.2022 EN Official Journal of the European Union L 188/7
Article 3
Entry into force and application
This Regulation shall enter into force on the twentieth day following that of its publication in the Official Journal of the
European Union.
It shall apply from 1 January 2023.
This Regulation shall be binding in its entirety and directly applicable in all Member States.
Done at Brussels, 9 March 2022.
For the Commission
The President
Ursula VON DER LEYENL 188/8 EN Official Journal of the European Union 15.7.2022
ANNEX I
In Annex I to Delegated Regulation (EU) 2021/2139, the following Sections 4.26, 4.27, 4.28, 4.29, 4.30 and 4.31 are
inserted:
‘4.26. Pre-commercial stages of advanced technologies to produce energy from nuclear processes with minimal
waste from the fuel cycle
Description of the activity
Research, development, demonstration and deployment of innovative electricity generation facilities, licenced by Member
States’ competent authorities in accordance with applicable national law, that produce energy from nuclear processes with
minimal waste from the fuel cycle.
The activity is classified under NACE code M72 and M72.1 in accordance with the statistical classification of economic
activities established by Regulation (EC) No 1893/2006.
An economic activity in this category is an activity as referred to in Article 10(2) of Regulation (EU) 2020/852 where it
complies with all the technical screening criteria set out in this Section.
Technical screening criteria
General criteria pertaining to substantial contribution to climate change mitigation and Do no significant harm (‘DNSH’)
1. The project related to the economic activity (‘the project’) is located in a Member State which complies with all of the
following:
(a) the Member State has fully transposed Council Directive 2009/71/Euratom *1 and Council Directive
2011/70/Euratom *2;
(b) the Member State complies with the Treaty establishing the European Atomic Energy Community (‘Euratom
Treaty’) and with legislation adopted on its basis, in particular, Directive 2009/71/Euratom, Directive
2011/70/Euratom and Council Directive 2013/59/Euratom *3, as well as applicable Union environmental law
adopted under Article 192 TFEU, in particular Directive 2011/92/EU of the European Parliament and of the
Council *4 and Directive 2000/60/EC of the European Parliament and of the Council *5;
(c) the Member State has in place, as of the approval date of the project, a radioactive waste management fund and
a nuclear decommissioning fund which can be combined;
(d) the Member State has demonstrated that it will have resources available at the end of the estimated useful life of
the nuclear power plant corresponding to the estimated cost of radioactive waste management and
decommissioning in compliance with Commission Recommendation 2006/851/Euratom *6;
(e) the Member State has operational final disposal facilities for all very low-, low- and intermediate-level
radioactive waste, notified to the Commission under Article 41 Euratom Treaty or Article 1(4) of Council
Regulation (Euratom) No 2587/1999, and included in the national programme updated under Directive 2011/
70/Euratom;
(f) the Member State has a documented plan with detailed steps to have in operation, by 2050, a disposal facility for
high-level radioactive waste describing all of the following:
(i) concepts or plans and technical solutions for spent fuel and radioactive waste management from generation
to disposal;
(ii) concepts or plans for the post-closure period of a disposal facility’s lifetime, including the period during
which appropriate controls are retained and the means to be employed to preserve knowledge of that
facility in the longer term;15.7.2022 EN Official Journal of the European Union L 188/9
(iii) the responsibilities for the plan implementation and the key performance indicators to monitor its
progress;
(iv) cost assessments and financing schemes.
For the purposes of point (f), Member States may use plans drawn up as part of the national programme required by
Articles 11 and 12 of Directive 2011/70/Euratom.
2. The project is part of a Union financed research programme or the project has been notified to the Commission in
accordance with Article 41 of the Euratom Treaty or with Article 1(4) of Council Regulation (Euratom)
No 2587/1999, where either of these provisions is applicable, the Commission has given its opinion on it in
accordance with Article 43 of the Euratom Treaty, and all the issues raised in the opinion, with relevance for the
application of Article 10(2) and Article 17 of Regulation (EU) 2020/852, and of the technical screening criteria laid
down in this Section have been satisfactorily addressed.
3. The Member State concerned has committed to report to the Commission every five years for each project on all of
the following:
(a) the adequacy of the accumulated resources referred to in point 1(c);
(b) actual progress in the implementation of the plan referred to in point 1(f).
On the basis of the reports, the Commission shall review the adequacy of the accumulated resources of the
radioactive waste management fund and the nuclear decommissioning fund referred to in point 1(c) and the
progress in the implementation of the documented plan referred to in point 1(f) and it may address an opinion to
the Member State concerned.
4. The activity complies with national legislation that transposes the legislation referred to in point 1(a) and (b),
including as regards the evaluation, in particular through stress tests, of the resilience of the nuclear power plants
located on the territory of the Union against extreme natural hazards, including earthquakes. Accordingly, the
activity takes place on the territory of a Member State where the operator of a nuclear installation:
(a) has submitted a demonstration of nuclear safety, whose scope and level of detail is commensurate with the
potential magnitude and nature of the hazard relevant for the nuclear installation and its site (Article 6, point
(b), of Directive 2009/71/Euratom);
(b) has taken defence-in-depth measures to ensure, inter alia, that the impact of extreme external natural and
unintended man-made hazards is minimised (Article 8b(1), point (a) of Directive 2009/71/Euratom);
(c) has performed an appropriate site and installation-specific assessment when the operator concerned applies for
a licence to construct or operate a nuclear power plant (Article 8c(a) of Directive 2009/71/Euratom).
5. The activity fulfils the requirements of Directive 2009/71/Euratom, supported by the latest international guidance
from the International Atomic Energy Agency (‘IAEA’) and the Western European Nuclear Regulator’s Association
(‘WENRA’), contributing to increasing the resilience and the ability of new and existing nuclear power plants to
cope with extreme natural hazards, including floods and extreme weather conditions.
6. Radioactive waste as referred to in point 1(e) and (f), is disposed of in the Member State in which it was generated,
unless there is an agreement between the Member State concerned and the Member State of destination, as
established in Directive 2011/70/Euratom. In that case, the Member State of destination has radioactive waste
management and disposal programmes and a suitable disposal facility in operation in compliance with the
requirements of Directive 2011/70/Euratom.L 188/10 EN Official Journal of the European Union 15.7.2022
Additional criteria pertaining to substantial contribution to climate change mitigation
The activity aims at generating or generates electricity using nuclear energy. Life-cycle greenhouse gas (GHG) emissions
from the generation of electricity from nuclear energy are below the threshold of 100 g CO2e/kWh.
Life-cycle GHG emission savings are calculated using Commission Recommendation 2013/179/EU or, alternatively, using
ISO 14067:2018 or ISO 14064-1:2018.
Quantified life-cycle GHG emissions are verified by an independent third party.
Additional criteria pertaining to Do no significant harm (‘DNSH’)
(2) Climate change adaptation The activity complies with the criteria set out in Appendix A to this Annex.
The activity complies with the requirements laid down in Article 6(b), 8b(1), point
(a), and Article 8c(a) of Directive 2009/71/Euratom.
The activity fulfils the requirements of Directive 2009/71/Euratom implemented in
accordance with the international guidance of the IAEA and WENRA relating to
extreme natural hazards, including floods and extreme weather conditions.
(3) Sustainable use and protection of The activity complies with the criteria set out in Appendix B to this Annex.
water and marine resources
Environmental degradation risks related to preserving water quality and avoiding
water stress are identified and addressed, in accordance with a water use and
protection management plan, developed in consultation with stakeholders
concerned.
In order to limit thermal anomalies associated with the discharge of waste heat,
operators of inland nuclear power plants utilising once-through wet cooling by
taking water from a river or a lake control:
(a) the maximum temperature of the recipient freshwater body after mixing, and
(b) the maximum temperature difference between the discharged cooling water and
the recipient freshwater body.
The temperature control is implemented in accordance with the individual licence
conditions for the specific operations, where applicable, or threshold values in line
with Union law.
The activity complies with the Industry Foundation Classes (IFC) standards.
Nuclear activities are operated in compliance with requirements on water intended
for human consumption of Directive 2000/60/EC and of Directive
2013/51/Euratom laying down requirements for the protection of the health of the
general public with regard to radioactive substances in water intended for human
consumption.
(4) Transition to a circular economy A plan for the management of both non-radioactive and radioactive waste is in place
and ensures maximal reuse or recycling of such waste at end of life in accordance
with the waste hierarchy, including through contractual agreements with waste
management partners, the reflection in financial projections or the official project
documentation.
During operation and decommissioning, the amount of radioactive waste is
minimised and the amount of free-release materials is maximised in accordance
with Directive 2011/70/Euratom, and in compliance with the radiation protection
requirements laid down in Directive 2013/59/Euratom.15.7.2022 EN Official Journal of the European Union L 188/11
A financing scheme is in place to ensure adequate funding for all decommissioning
activities and for the management of spent fuel and radioactive waste, in compliance
with Directive 2011/70/Euratom and Recommendation 2006/851/Euratom.
An Environmental Impact Assessment is completed prior to the construction of a
nuclear power plant, in accordance with Directive 2011/92/EU. The required
mitigation and compensatory measures are implemented.
The relevant elements in this Section are covered by Member States’ reports to the
Commission in accordance with Article 14(1) of Directive 2011/70/Euratom.
(5) Pollution prevention and control The activity complies with the criteria set out in Appendix C to this Annex.
Non-radioactive emissions are within or lower than the emission levels associated
with the best available techniques (BAT-AEL) ranges set out in the best available
techniques (BAT) conclusions for large combustion plants. No significant cross-
media effects occur.
For nuclear power plants greater than 1 MW thermal input but below the
thresholds for the BAT conclusions for large combustion plants to apply, emissions
are below the emission limit values set out in Annex II, part 2, to Directive (EU)
2015/2193.
Radioactive discharges to air, water bodies and ground (soil) comply with individual
licence conditions for the specific operations, where applicable, or national
threshold values in line with Directive 2013/51/Euratom *7 and Directive 2013/59/
Euratom.
Spent fuel and radioactive waste is safely and responsibly managed in accordance
with Directive 2011/70/Euratom and Directive 2013/59/Euratom.
An adequate capacity of interim storage is available for the project, while national
plans for disposal are in place to minimise the duration of interim storage, in
compliance with the provision of Directive 2011/70/Euratom that considers
radioactive waste storage, including long-term storage, as an interim solution, but
not an alternative to disposal.
(6) Protection and restoration of bio The activity complies with the criteria set out in Appendix D to this Annex.
diversity and ecosystems
An Environmental Impact Assessment is completed prior to the construction of a
nuclear power plant, in accordance with Directive 2011/92/EU. The required
mitigation and compensatory measures are implemented.
For sites/operations located in or near biodiversity sensitive areas likely to have a
significant effect on biodiversity sensitive areas (including the Natura 2000 network
of protected areas, Unesco World Heritage sites and Key Biodiversity Areas, as well
as other protected areas), an appropriate assessment, where applicable, has been
conducted and based on its conclusions the necessary mitigation measures are
implemented.
The sites/operations shall not be detrimental to the conservation status of any of the
habitats or species present in protected areas.L 188/12 EN Official Journal of the European Union 15.7.2022
4.27. Construction and safe operation of new nuclear power plants, for the generation of electricity or heat,
including for hydrogen production, using best-available technologies
For the purposes of this Section, best-available technologies mean technologies that fully comply with the requirements of
Directive 2009/71/Euratom and fully respect the most recent technical parameters of the IAEA standards and the WENRA
Safety objectives and Reference Levels.
Description of the activity
Construction and safe operation of new nuclear installations for which the construction permit has been issued by 2045 by
Member States’ competent authorities, in accordance with applicable national law, to produce electricity or process heat,
including for the purposes of district heating or industrial processes such as hydrogen production (new nuclear
installations), as well as their safety upgrades.
The activity is classified under NACE codes D35.11 and F42.22 in accordance with the statistical classification of economic
activities established by Regulation (EC) No 1893/2006.
An economic activity in this category is an activity as referred to in Article 10(2) of Regulation (EU) 2020/852 where it
complies with all the technical screening criteria set out in this Section.
Technical screening criteria
General criteria pertaining to substantial contribution to climate change mitigation and Do no significant harm (‘DNSH’)
1. The project related to the economic activity (‘the project’) is located in a Member State which complies with all of the
following:
(a) the Member State has fully transposed Council Directive 2009/71/Euratom and Council Directive 2011/70/
Euratom;
(b) the Member State complies with the Euratom Treaty and with legislation adopted on its basis, in particular,
Directive 2009/71/Euratom, Directive 2011/70/Euratom and Directive 2013/59/Euratom, as well as applicable
Union environmental law adopted under Article 192 TFEU, in particular Directive 2011/92/EU and Directive
2000/60/EC;
(c) the Member State has in place, as of the approval date of the project, a radioactive waste management fund and
a nuclear decommissioning fund which can be combined;
(d) the Member State has demonstrated that it will have resources available at the end of the estimated useful life of
the nuclear power plant corresponding to the estimated cost of radioactive waste management and
decommissioning in compliance with Recommendation 2006/851/Euratom;
(e) the Member State has operational final disposal facilities for all very low-, low- and intermediate-level
radioactive waste, notified to the Commission under Article 41 of the Euratom Treaty or under Article 1(4) of
Council Regulation 2587/1999 and included in the national programme updated under Council Directive
2011/70/Euratom;
(f) the Member State has a documented plan with detailed steps to have in operation, by 2050, a disposal facility for
high-level radioactive waste describing all of the following:
(i) concepts or plans and technical solutions for spent fuel and radioactive waste management from generation
to disposal;
(ii) concepts or plans for the post-closure period of a disposal facility’s lifetime, including the period during
which appropriate controls are retained and the means to be employed to preserve knowledge of that
facility in the longer term;
(iii) the responsibilities for the plan implementation and the key performance indicators to monitor its
progress;
(iv) cost assessments and financing schemes.15.7.2022 EN Official Journal of the European Union L 188/13
For the purposes of point (f), Member States may use the plans drawn up as part of the national programme required
by Articles 11 and 12 of Directive 2011/70/Euratom.
2. The project fully applies the best-available technology and from 2025 accident-tolerant fuel. The technology is
certified and approved by the national safety regulator.
3. The project has been notified to the Commission in accordance with Article 41 of the Euratom Treaty or with
Article 1(4) of Council Regulation 2587/1999, where either of these provisions is applicable, the Commission has
given its opinion on it in accordance with Article 43 of the Euratom Treaty, and all the issues raised in the opinion,
with relevance for the application of Article 10(2) and Article 17 of Regulation (EU) 2020/852, and of the technical
screening criteria laid down in this Section, have been satisfactorily addressed.
4. The Member State concerned has committed to report to the Commission every five years for each project on all of
the following:
(a) the adequacy of the accumulated resources referred to in point 1(c);
(b) actual progress in the implementation of the plan referred to in point 1(f).
On the basis of the reports, the Commission shall review the adequacy of the accumulated resources of the
radioactive waste management fund and the nuclear decommissioning fund referred to in point 1(c) and the
progress in the implementation of the documented plan referred to in point 1(f) and it may address an opinion to
the Member State concerned.
5. The Commission shall review, as of 2025 and at least every 10 years, the technical parameters corresponding to the
best-available technology on the basis of the assessment by the European Nuclear Safety Regulators’ Group
(‘ENSREG’).
6. The activity complies with national legislation that transposes the legislation referred to in point 1(a) and (b),
including as regards the evaluation, in particular through stress-tests, of the resilience of the nuclear power plants
located on the territory of the Union against extreme natural hazards, including earthquakes. Accordingly, the
activity takes place on the territory of a Member State where the operator of a nuclear installation:
(a) has submitted a demonstration of nuclear safety, whose scope and level of detail is commensurate with the
potential magnitude and nature of the hazard relevant for the nuclear installation and its site (Article 6, point
(b), of Directive 2009/71/Euratom);
(b) has taken defence-in-depth measures to ensure, inter alia, that the impact of extreme external natural and
unintended man-made hazards is minimised (Article 8b(1), point (a), of Directive 2009/71/Euratom);
(c) has performed an appropriate site and installation-specific assessment when the operator concerned applies for
a licence to construct or operate a nuclear power plant (Article 8c(a) of Directive 2009/71/Euratom).
7. The activity fulfils the requirements of Directive 2009/71/Euratom, supported by the latest international guidance
from the IAEA and WENRA, contributing to increasing the resilience and the ability of new and existing nuclear
power plants to cope with extreme natural hazards, including floods and extreme weather conditions.
8. Radioactive waste as referred to in point 1(e) and (f) is disposed of in the Member State in which it was generated,
unless there is an agreement between the Member State concerned and the Member State of destination, as
established in Directive 2011/70/Euratom. In that case, the Member State of destination has radioactive waste
management and disposal programmes and a suitable disposal facility in operation in compliance with the
requirements of Directive 2011/70/Euratom.L 188/14 EN Official Journal of the European Union 15.7.2022
Additional criteria pertaining to substantial contribution to climate change mitigation
The activity generates electricity using nuclear energy. Life-cycle greenhouse gas (GHG) emissions from the generation of
electricity from nuclear energy are below the threshold of 100 g CO2e/kWh.
Life-cycle GHG emission savings are calculated using Recommendation 2013/179/EU or, alternatively, using ISO
14067:2018 or ISO 14064-1:2018.
Quantified life-cycle GHG emissions are verified by an independent third party.
Additional criteria pertaining to Do no significant harm (‘DNSH’)
(2) Climate change adaptation The activity complies with the criteria set out in Appendix A to this Annex.
The activity complies with the requirements laid down in Article 6(b), Article 8b(1),
point (a), and Article 8c(a) of Directive 2009/71/Euratom.
The activity fulfils the requirements of Directive 2009/71/Euratom, implemented in
accordance with the international guidance of the IAEA and WENRA relating to
extreme natural hazards, including floods and extreme weather conditions.
(3) Sustainable use and protection of The activity complies with the criteria set out in Appendix B to this Annex.
water and marine resources
Environmental degradation risks related to preserving water quality and avoiding
water stress are identified and addressed, in accordance with a water use and
protection management plan, developed in consultation with stakeholders
concerned.
In order to limit thermal anomalies associated with the discharge of waste heat,
operators of inland nuclear power plants utilising once-through wet cooling by
taking water from a river or a lake control:
(a) the maximum temperature of the recipient freshwater body after mixing, and
(b) the maximum temperature difference between the discharged cooling water and
the recipient freshwater body.
The temperature control is implemented in accordance with the individual licence
conditions for the specific operations, where applicable, or threshold values in line
with the Union law.
The activity complies with the Industry Foundation Classes (IFC) standards.
Nuclear activities are operated in compliance with requirements on water intended
for human consumption of Directive 2000/60/EC and of Directive
2013/51/Euratom laying down requirements for the protection of the health of the
general public with regard to radioactive substances in water intended for human
consumption.
(4) Transition to a circular economy A plan for the management of both non-radioactive and radioactive waste is in place
and ensures maximal reuse or recycling of such waste at end of life in accordance
with the waste hierarchy, including through contractual agreements with waste
management partners, the reflection in financial projections or the official project
documentation.
During operation and decommissioning, the amount of radioactive waste is
minimised and the amount of free-release materials is maximised in accordance
with Directive 2011/70/Euratom, and in compliance with the radiation protection
requirements laid down in Directive 2013/59/Euratom.15.7.2022 EN Official Journal of the European Union L 188/15
A financing scheme is in place to ensure adequate funding for all decommissioning
activities and for the management of spent fuel and radioactive waste, in compliance
with Directive 2011/70/Euratom and Recommendation 2006/851/Euratom.
An Environmental Impact Assessment is completed prior to the construction of a
nuclear power plant, in accordance with Directive 2011/92/EU. The required
mitigation and compensatory measures are implemented.
The relevant elements in this Section are covered by Member States’ reports to the
Commission in accordance with Article 14(1) of Directive 2011/70/Euratom.
(5) Pollution prevention and control The activity complies with the criteria set out in Appendix C to this Annex.
Non-radioactive emissions are within or lower than the emission levels associated
with the best available techniques (BAT-AEL) ranges set out in the best available
techniques (BAT) conclusions for large combustion plants. No significant cross-
media effects occur.
For nuclear power plants greater than 1 MW thermal input but below the
thresholds for the BAT conclusions for large combustion plants to apply, emissions
are below the emission limit values set out in Annex II, part 2, to Directive (EU)
2015/2193.
Radioactive discharges to air, water bodies and ground (soil) comply with individual
licence conditions for the specific operations, where applicable, or national
threshold values in line with Directive 2013/51/Euratom and Directive 2013/59/
Euratom.
Spent fuel and radioactive waste is safely and responsibly managed in accordance
with Directive 2011/70/Euratom and Directive 2013/59/Euratom.
An adequate capacity of interim storage is available for the project, while national
plans for disposal are in place to minimise the duration of interim storage, in
compliance with Directive 2011/70/Euratom that considers radioactive waste
storage, including long-term storage, as an interim solution, but not an alternative
to disposal.
(6) Protection and restoration of bio The activity complies with the criteria set out in Appendix D to this Annex.
diversity and ecosystems
An Environmental Impact Assessment is completed prior to the construction of a
nuclear power plant, in accordance with Directive 2011/92/EU. The required
mitigation and compensatory measures are implemented.
For sites/operations located in or near biodiversity sensitive areas likely to have a
significant effect on biodiversity sensitive areas (including the Natura 2000 network
of protected areas, Unesco World Heritage sites and Key Biodiversity Areas, as well
as other protected areas), an appropriate assessment, where applicable, has been
conducted and based on its conclusions the necessary mitigation measures are
implemented.
The sites/operations shall not be detrimental to the conservation status of any of the
habitats or species present in protected areas.L 188/16 EN Official Journal of the European Union 15.7.2022
4.28. Electricity generation from nuclear energy in existing installations
Description of the activity
Modification of existing nuclear installations for the purposes of extension, authorised by Member States’ competent
authorities by 2040 in accordance with applicable national law, of the service time of safe operation of nuclear
installations that produce electricity or heat from nuclear energy (‘nuclear power plants’).
The activity is classified under NACE codes D35.11 and F42.22 in accordance with the statistical classification of economic
activities established by Regulation (EC) No 1893/2006.
An economic activity in this category is an activity as referred to in Article 10(2) of Regulation (EU) 2020/852 where it
complies with all the technical screening criteria set out in this Section.
Technical screening criteria
General criteria pertaining to substantial contribution to climate change mitigation and Do no significant harm (‘DNSH’)
1. The project related to the economic activity (‘the project’) is located in a Member State which complies with all of the
following:
(a) the Member State has fully transposed Council Directive 2009/71/Euratom and Council Directive 2011/70/
Euratom;
(b) the Member State complies with the Euratom Treaty and with legislation adopted on its basis, in particular,
Directive 2009/71/Euratom, Directive 2011/70/Euratom and Directive 2013/59/Euratom, and with applicable
Union environmental law adopted under Article 192 TFEU, in particular Directive 2011/92/EU and Directive
2000/60/EC;
(c) the Member State has in place, as of the approval date of the project, a radioactive waste management fund and
a nuclear decommissioning fund which can be combined;
(d) the Member State has demonstrated that it will have resources available at the end of the estimated useful life of
the nuclear power plant corresponding to the estimated cost of radioactive waste management and
decommissioning in compliance with Recommendation 2006/851/Euratom;
(e) the Member State has operational final disposal facilities for all very low-, low- and intermediate-level
radioactive waste, notified to the Commission under Article 41 of the Euratom Treaty or under Article 1(4) of
Council Regulation 2587/1999 and included in the national programme updated under Council Directive
2011/70/Euratom;
(f) for projects authorised after 2025, the Member State has a documented plan with detailed steps to have in
operation, by 2050, a disposal facility for high-level radioactive waste describing all of the following:
(i) concepts or plans and technical solutions for spent fuel and radioactive waste management from generation
to disposal;
(ii) concepts or plans for the post-closure period of a disposal facility’s lifetime, including the period during
which appropriate controls are retained and the means to be employed to preserve knowledge of that
facility in the longer term;
(iii) the responsibilities for the plan implementation and the key performance indicators to monitor its
progress;
(iv) cost assessments and financing schemes.
For the purposes of point (f), Member States may use the plans drawn up as part of the national programme required
by Articles 11 and 12 of Directive 2011/70/Euratom.15.7.2022 EN Official Journal of the European Union L 188/17
2. The upgraded project implements any reasonably practicable safety improvement and from 2025 makes use of
accident-tolerant fuel. The technology is certified and approved by the national safety regulator.
3. The project has been notified to the Commission in accordance with Article 41 of the Euratom Treaty or with
Article 1(4) of Council Regulation 2587/1999, where either of these provisions is applicable, the Commission has
given its opinion on it in accordance with Article 43 of the Euratom Treaty, and all the issues raised in the opinion,
with relevance for the application of Article 10(2) and Article 17 of Regulation (EU) 2020/852, and of the technical
screening criteria laid down in this Section, have been satisfactorily addressed.
4. The Member State concerned has committed to report to the Commission every five years for each project on all of
the following:
(a) the adequacy of the accumulated resources referred to in point 1(c);
(b) actual progress in the implementation of the plan referred to in point 1(f).
On the basis of the reports, the Commission shall review the adequacy of the accumulated resources of the
radioactive waste management fund and the nuclear decommissioning fund referred to in point 1(c) and the
progress in the implementation of the documented plan referred to in point 1(f) and it may address an opinion to
the Member State concerned.
5. The activity complies with national legislation that transposes the legislation referred to in point 1(a) and (b),
including as regards the evaluation, in particular through stress-tests, of the resilience of the Union nuclear power
plants against extreme natural hazards, including earthquakes. Accordingly, the activity takes place on the territory
of a Member State where the operator of a nuclear installation:
(a) has submitted a demonstration of nuclear safety, whose scope and level of detail is commensurate with the
potential magnitude and nature of the hazard relevant for the nuclear installation and its site (Article 6, point
(b), of Directive 2009/71/Euratom);
(b) has taken defence-in-depth measures to ensure, inter alia, that the impact of extreme external natural and
unintended man-made hazards is minimised (Article 8b(1), point (a), of Directive 2009/71/Euratom);
(c) has performed an appropriate site and installation-specific assessment when the operator concerned applies for
a licence to construct or operate a nuclear power plant (Article 8c(a) of Directive 2009/71/Euratom).
6. The activity fulfils the requirements of Directive 2009/71/Euratom, supported by the latest international guidance
from the IAEA and WENRA, contributing to increasing the resilience and the ability of new and existing nuclear
power plants to cope with extreme natural hazards, including floods and extreme weather conditions.
7. Radioactive waste referred to in point 1(e) and (f) is disposed of in the Member State in which it was generated,
unless there is an agreement between the Member State concerned and the Member State of destination, as
established in Directive 2011/70/Euratom. In that case, the Member State of destination has radioactive waste
management and disposal programmes and a suitable disposal facility in operation in compliance with the
requirements of Directive 2011/70/Euratom.
Additional criteria pertaining to substantial contribution to climate change mitigation
The activity generates electricity using nuclear energy. Life-cycle greenhouse gas (GHG) emissions from the generation of
electricity from nuclear energy are below the threshold of 100 g CO2e/kWh.
Life-cycle GHG emission savings are calculated using Recommendation 2013/179/EU or, alternatively, using ISO
14067:2018 or ISO 14064-1:2018.
Quantified life-cycle GHG emissions are verified by an independent third party.L 188/18 EN Official Journal of the European Union 15.7.2022
Additional criteria pertaining to Do no significant harm (‘DNSH’)
(2) Climate change adaptation The activity complies with the criteria set out in Appendix A to this Annex.
The activity complies with the requirements laid down in Article 6(b), Article 8b(1),
point (a), and Article 8c(a) of Directive 2009/71/Euratom.
The activity fulfils the requirements of Directive 2009/71/Euratom implemented in
accordance with international guidance of the IAEA and WENRA relating to
extreme natural hazards, including floods and extreme weather conditions.
(3) Sustainable use and protection of The activity complies with the criteria set out in Appendix B to this Annex.
water and marine resources
Environmental degradation risks related to preserving water quality and avoiding
water stress are identified and addressed, in accordance with a water use and
protection management plan, developed in consultation with stakeholders
concerned.
In order to limit thermal anomalies associated with the discharge of waste heat,
operators of inland nuclear power plants utilising once-through wet cooling by
taking water from a river or a lake control:
(a) the maximum temperature of the recipient freshwater body after mixing, and
(b) the maximum temperature difference between the discharged cooling water and
the recipient freshwater body.
The temperature control is implemented in accordance with the individual licence
conditions for the specific operations, where applicable, or threshold values in line
with Union law.
The activity complies with the Industry Foundation Classes (IFC) standards.
Nuclear activities are operated in compliance with requirements on water intended
for human consumption of Directive 2000/60/EC and of Directive
2013/51/Euratom laying down requirements for the protection of the health of the
general public with regard to radioactive substances in water intended for human
consumption.
(4) Transition to a circular economy A plan for the management of both non-radioactive and radioactive waste is in place
and ensures maximal reuse or recycling of such waste at end of life in accordance
with the waste hierarchy, including through contractual agreements with waste
management partners, the reflection in financial projections or the official project
documentation.
During operation and decommissioning, the amount of radioactive waste is
minimised and the amount of free-release materials is maximised in accordance
with Directive 2011/70/Euratom, and in compliance with the radiation protection
requirements laid down in Directive 2013/59/Euratom.
A financing scheme is in place to ensure adequate funding for all decommissioning
activities and for the management of spent fuel and radioactive waste, in compliance
with Directive 2011/70/Euratom and Recommendation 2006/851/Euratom.15.7.2022 EN Official Journal of the European Union L 188/19
An Environmental Impact Assessment is completed prior to the construction of a
nuclear power plant, in accordance with Directive 2011/92/EU. The required
mitigation and compensatory measures are implemented.
The relevant elements in this Section are covered by Member States’ reports to the
Commission in accordance with Article 14(1) of Directive 2011/70/Euratom.
(5) Pollution prevention and control The activity complies with the criteria set out in Appendix C to this Annex.
Non-radioactive emissions are within or lower than the emission levels associated
with the best available techniques (BAT-AEL) ranges set out in the best available
techniques (BAT) conclusions for large combustion plants. No significant cross-
media effects occur.
For nuclear power plants greater than 1 MW thermal input but below the
thresholds for the BAT conclusions for large combustion plants to apply, emissions
are below the emission limit values set out in Annex II, part 2, to Directive (EU)
2015/2193.
Radioactive discharges to air, water bodies and ground (soil) comply with individual
licence conditions for the specific operations, where applicable, or national
threshold values in line with Directive 2013/51/Euratom and Directive 2013/59/
Euratom.
Spent fuel and radioactive waste is safely and responsibly managed in accordance
with Directive 2011/70/Euratom and Directive 2013/59/Euratom.
An adequate capacity of interim storage is available for the project, while national
plans for disposal are in place to minimise the duration of interim storage, in
compliance with Directive 2011/70/Euratom that considers radioactive waste
storage, including long-term storage, as an interim solution, but not an alternative
to disposal.
(6) Protection and restoration of bio The activity complies with the criteria set out in Appendix D to this Annex.
diversity and ecosystems
An Environmental Impact Assessment is completed prior to the construction of a
nuclear power plant, in accordance with Directive 2011/92/EU. The required
mitigation and compensatory measures are implemented.
For sites/operations located in or near biodiversity sensitive areas likely to have a
significant effect on biodiversity sensitive areas (including the Natura 2000 network
of protected areas, Unesco World Heritage sites and Key Biodiversity Areas, as well
as other protected areas), an appropriate assessment, where applicable, has been
conducted and based on its conclusions the necessary mitigation measures are
implemented.
The sites/operations shall not be detrimental to the conservation status of any of the
habitats or species present in protected areas.L 188/20 EN Official Journal of the European Union 15.7.2022
4.29. Electricity generation from fossil gaseous fuels
Description of the activity
Construction or operation of electricity generation facilities that produce electricity using fossil gaseous fuels. This activity
does not include electricity generation from the exclusive use of renewable non-fossil gaseous and liquid fuels as referred
to in Section 4.7 of this Annex and biogas and bio-liquid fuels as referred to in Section 4.8 of this Annex.
The economic activities in this category may be associated with several NACE codes, notably D35.11 and F42.22 in
accordance with the statistical classification of economic activities established by Regulation (EC) No 1893/2006.
An economic activity in this category is a transitional activity as referred to in Article 10(2) of Regulation (EU) 2020/852
where it complies with the technical screening criteria set out in this Section.
Technical screening criteria
Substantial contribution to climate change mitigation
1. The activity meets either of the following criteria:
(a) the life-cycle GHG emissions from the generation of electricity using fossil gaseous fuels are lower than 100 g
CO2e/kWh.
Life-cycle GHG emissions are calculated based on project-specific data, where available, using Recommendation
2013/179/EU or, alternatively, using ISO 14067:2018 or ISO 14064-1:2018.
Quantified life-cycle GHG emissions are verified by an independent third party.
Where facilities incorporate any form of abatement, including carbon capture or use of renewable or low-carbon
gases, that abatement activity complies with the criteria set out in the relevant Section of this Annex, where
applicable.
Where the CO that would otherwise be emitted from the electricity generation process is captured for the purpose
2
of underground storage, the CO is transported and stored underground, in accordance with the technical screening
2
criteria set out in Sections 5.11 and 5.12 of this Annex.
(b) facilities for which the construction permit is granted by 31 December 2030comply with all of the following:
(i) direct GHG emissions of the activity are lower than 270g CO2e/kWh of the output energy, or annual direct
GHG emissions of the activity do not exceed an average of 550kgCO2e/kW of the facility’s capacity over
20 years;
(ii) the power to be replaced cannot be generated from renewable energy sources, based on a comparative
assessment with the most cost-effective and technically feasible renewable alternative for the same capacity
identified; the result of this comparative assessment is published and is subject to a stakeholder consultation;
(iii) the activity replaces an existing high emitting electricity generation activity that uses solid or liquid fossil fuels;
(iv) the newly installed production capacity does not exceed the capacity of the replaced facility by more than
15 %;
(v) the facility is designed and constructed to use renewable and/or low-carbon gaseous fuels and the switch to full
use of renewable and/or low-carbon gaseous fuels takes place by 31 December 2035, with a commitment and
verifiable plan approved by the management body of the undertaking;
(vi) the replacement leads to a reduction in emissions of at least 55 % GHG over the lifetime of the newly installed
production capacity;
(vii) where the activity takes place on the territory of a Member State in which coal is used for energy generation,
that Member State has committed to phase-out the use of energy generation from coal and has reported this
in its integrated national energy and climate plan referred to in Article 3 of Regulation (EU) 2018/1999 of the
European Parliament and of the Council *8 or in another instrument.
Compliance with the criteria referred to in point 1(b) is verified by an independent third party. The independent third-party
verifier has the necessary resources and expertise to perform such verification. The independent third party verifier does
not have any conflict of interest with the owner or the funder, and is not involved in the development or operation of the
activity. The independent third party verifier carries out diligently the verification of compliance with the technical
screening criteria. In particular, every year the independent third party publishes and transmits to the Commission a report:
(a) certifying the level of direct GHG emissions referred to in point 1(b)(i);15.7.2022 EN Official Journal of the European Union L 188/21
(b) where applicable, assessing whether annual direct GHG emissions of the activity are on a credible trajectory to
comply with the average threshold over 20 years referred to in point 1(b)(i);
(c) assessing whether the activity is on a credible trajectory to comply with point 1(b)(v).
When undertaking the assessment referred to in point 1(b), the independent third party verifier takes into account in
particular the planned annual direct GHG emissions for each year of the trajectory, realised annual direct GHG emissions,
planned and realised operating hours, and planned and realised use of renewable or low carbon gases.
On the basis of the reports transmitted to it, the Commission may address an opinion to the relevant operators. The
Commission shall take those reports into account when performing the review referred to in Article 19(5) of Regulation
(EU) 2020/852.
2. The activity meets either of the following criteria:
(a) at construction, measurement equipment for monitoring of physical emissions, such as those from methane
leakage, is installed or a leak detection and repair programme is introduced;
(b) at operation, physical measurement of emissions are reported and leak is eliminated.
3. Where the activity blends fossil gaseous fuels with gaseous or liquid biofuels, the agricultural biomass used for the
production of the biofuels complies with the criteria laid down in Article 29, paragraphs 2 to 5, of Directive (EU)
2018/2001 while forest biomass complies with the criteria laid down in Article 29, paragraphs 6 and 7, of that
Directive.
Do no significant harm (‘DNSH’)
(2) Climate change adaptation The activity complies with the criteria set out in Appendix A to this Annex.
(3) Sustainable use and protection of The activity complies with the criteria set out in Appendix B to this Annex.
water and marine resources
(4) Transition to a circular economy N/A
(5) Pollution prevention and control The activity complies with the criteria set out in Appendix C to this Annex.
Emissions are within or lower than the emission levels associated with the best
available techniques (BAT-AEL) ranges set out in the latest relevant best available
techniques (BAT) conclusions, including the best available techniques (BAT)
conclusions for large combustion plants.
No significant cross-media effects occur.
For combustion plants with thermal input greater than 1 MW but below the
thresholds for the BAT conclusions for large combustion plants to apply, emissions
are below the emission limit values set out in Annex II, part 2, to Directive (EU)
2015/2193.
(6) Protection and restoration of bio The activity complies with the criteria set out in Appendix D to this Annex.
diversity and ecosystemsL 188/22 EN Official Journal of the European Union 15.7.2022
4.30. High-efficiency co-generation of heat/cool and power from fossil gaseous fuels
Description of the activity
Construction, refurbishment, and operation of combined heat/cool and power generation facilities using fossil gaseous
fuels. This activity does not include high-efficiency co-generation of heat/cool and power from the exclusive use of
renewable non-fossil gaseous and liquid fuels referred to in Section 4.19 of this Annex, and biogas and bio-liquid fuels
referred to in Section 4.20 of this Annex.
The economic activities in this category may be associated with NACE codes D35.11 and D35.30 in accordance with the
statistical classification of economic activities established by Regulation (EC) No 1893/2006.
An economic activity in this category is a transitional activity as referred to in Article 10(2) of Regulation (EU) 2020/852
where it complies with the technical screening criteria set out in this Section.
Technical screening criteria
Substantial contribution to climate change mitigation
1. The activity meets either of the following criteria:
(a) the life-cycle GHG emissions from the co-generation of heat/cool and power from gaseous fuels are lower than
100 g CO2e per 1 kWh of energy output of the co-generation.
Life-cycle GHG emissions are calculated based on project-specific data, where available, using Recommendation
2013/179/EU or, alternatively, using ISO 14067:2018 or ISO 14064-1:2018.
Quantified life-cycle GHG emissions are verified by an independent third party.
Where facilities incorporate any form of abatement, including carbon capture or use of renewable or low-carbon
gases, that abatement activity complies with the relevant Sections of this Annex, where applicable. Where the CO
2
emitted from the electricity generation is captured, the CO shall meet the emissions limit set out in point 1 of this
2
Section and, the CO be transported and stored underground in a way that meets the technical screening criteria for
2
transport of CO and storage of CO set out in Sections 5.11 and 5.12, respectively of this Annex.
2 2
(b) facilities for which the construction permit is granted by 31 December 2030comply with all of the following:
(i) the activity achieves primary energy savings of at least 10 % compared with the references to separate
production of heat and electricity; the primary energy savings are calculated on the basis of formula provided
in Directive 2012/27/EU;
(ii) direct GHG emissions of the activity are lower than 270 g CO2e/kWh of the output energy;
(iii) the power and/or heat/cool to be replaced cannot be generated from renewable energy sources, based on a
comparative assessment with the most cost-effective and technically feasible renewable alternative for the
same capacity identified; the result of this comparative assessment is published and is subject to a stakeholder
consultation;
(iv) the activity replaces an existing high emitting combined heat/cool and power generation activity, a separate
heat/cool generation activity, or a separate power generation activity that uses solid or liquid fossil fuels;
(v) the newly installed production capacity does not exceed the capacity of the replaced facility;
(vi) the facility is designed and constructed to use renewable and/or low-carbon gaseous fuels and the switch to
full use of renewable and/or low-carbon gaseous fuels takes place by 31 December 2035, with a
commitment and verifiable plan approved by the management body of the undertaking;
(vii) the replacement leads to a reduction in emissions of at least 55 % GHG per kWh of output energy;
(viii) the refurbishment of the facility does not increase production capacity of the facility;15.7.2022 EN Official Journal of the European Union L 188/23
(ix) where the activity takes place on the territory of a Member State in which coal is used for energy generation,
that Member State has committed to phase-out the use of energy generation from coal and has reported this
in its integrated national energy and climate plan referred to in Article 3 of Regulation (EU) 2018/1999 or in
another instrument.
Compliance with the criteria referred to in point 1(b) is verified by an independent third party. The independent third party
verifier has the necessary resources and expertise to perform such verification. The independent third party verifier does
not have any conflict of interest with the owner or the funder, and is not involved in the development or operation of the
activity. The independent third party verifier carries out diligently the verification of compliance with the technical
screening criteria. In particular, every year the independent third party publishes and transmits to the Commission a report:
(a) certifying the level of direct GHG emissions referred to in point 1(b)(ii);
(b) assessing whether the activity is on a credible trajectory to comply with point 1(b)(vi).
On the basis of the reports transmitted to it, the Commission may address an opinion to the operators concerned. The
Commission shall take those reports into account when performing the review referred to in Article 19(5) of Regulation
(EU) 2020/852.
2. The activity meets either of the following criteria:
(a) at construction, measurement equipment for monitoring of physical emissions, including those from methane
leakage, is installed or a leak detection and repair program is introduced;
(b) at operation, physical measurement of emissions are reported and any leak is eliminated.
Do no significant harm (‘DNSH’)
(2) Climate change adaptation The activity complies with the criteria set out in Appendix A to this Annex.
(3) Sustainable use and protection of water The activity complies with the criteria set out in Appendix B to this Annex.
and marine resources
(4) Transition to a circular economy N/A
(5) Pollution prevention and control The activity complies with the criteria set out in Appendix C to this Annex.
Emissions are within or lower than the emission levels associated with the
best available techniques (BAT-AEL) ranges set out in the latest relevant best
available techniques (BAT) conclusions, including the best available
techniques (BAT) conclusions for large combustion plants.
No significant cross-media effects occur.
For combustion plants with thermal input greater than 1 MW but below the
thresholds for the BAT conclusions for large combustion plants to apply,
emissions are below the emission limit values set out in Annex II, part 2, to
Directive (EU) 2015/2193.
(6) Protection and restoration of biodiversity The activity complies with the criteria set out in Appendix D to this Annex.
and ecosystems
4.31. Production of heat/cool from fossil gaseous fuels in an efficient district heating and cooling system
Description of the activity
Construction, refurbishment and operation of heat generation facilities that produce heat/cool using fossil gaseous fuels
connected to efficient district heating and cooling within the meaning of Article 2, point (41) of Directive 2012/27/EU.
This activity does not include production of heat/cool in an efficient district heating from the exclusive use of renewable
non-fossil gaseous and liquid fuels referred to in Section 4.23 of this Annex and biogas and bio-liquid fuels referred to in
Section 4.24 of this Annex.
The activity is classified under NACE code D35.30 in accordance with the statistical classification of economic activities
established by Regulation (EC) No 1893/2006.
An economic activity in this category is a transitional activity as referred to in Article 10(2) of Regulation (EU) 2020/852
where it complies with the technical screening criteria set out in this Section.L 188/24 EN Official Journal of the European Union 15.7.2022
Technical screening criteria
Substantial contribution to climate change mitigation
1. The activity meets either of the following criteria:
(a) Life-cycle GHG emissions from the generation of heat/cool from gaseous fuels are lower than 100 g CO2e/kWh.
Life-cycle GHG emission savings are calculated using Recommendation 2013/179/EU or, alternatively, using ISO
14067:2018 or ISO 14064-1:2018.
Quantified life-cycle GHG emissions are verified by an independent third party.
Where facilities incorporate any form of abatement, including carbon capture or use of renewable or low-carbon
gases, that abatement activity complies with the relevant Sections of this Annex, where applicable. Where the CO
2
emitted from the electricity generation is captured, the CO shall meet the emissions limit set out in point 1 of this
2
Section and shall be transported and stored underground in a way that meets the technical screening criteria for
transport of CO and storage of CO set out in Sections 5.11 and 5.12, respectively of this Annex.
2 2
(b) facilities for which the construction permit is granted by 31 December 2030comply with all of the following:
(i) the thermal energy generated by the activity is used in an efficient district heating and cooling system as
defined in Directive 2012/27/EU;
(ii) the direct GHG emissions of the activity are lower than 270 g CO2e/kWh of the output energy;
(iii) the heat/cool to be replaced cannot be generated from renewable energy sources, based on a comparative
assessment with the most cost-effective and technically feasible renewable alternative for the same capacity
identified; the result of this comparative assessment is published and is subject to a stakeholder consultation;
(iv) the activity replaces an existing high emitting heating/cooling activity using solid or liquid fossil fuel;
(v) the newly installed production capacity does not exceed the capacity of the replaced facility;
(vi) the facility is designed and constructed to use renewable and/or low-carbon gaseous fuels and the switch to
full use of renewable and/or low-carbon gaseous fuels takes place by 31 December 2035, with a
commitment and verifiable plan approved by the management body of the undertaking;
(vii) the replacement leads to a reduction in emissions of at least 55 % GHG per kWh of output energy;
(viii) the refurbishment of the facility does not increase production capacity of the facility;
(ix) where the activity takes place on the territory of a Member State in which coal is used for energy generation,
that Member State has committed to phase-out the use of energy generation from coal and has reported this
in its integrated national energy and climate plan referred to in Article 3 of Regulation (EU) 2018/1999 or in
another instrument.
Compliance with the criteria referred to in point 1(b) is verified by an independent third party. The independent third-party
verifier has the necessary resources and expertise to perform such verification. The independent third party verifier does
not have any conflict of interest with the owner or the funder, and is not be involved in the development or operation of
the activity. The independent third party verifier carries out diligently the verification of compliance with the technical
screening criteria. In particular, every year the independent third party publishes and transmits to the Commission a report:
(a) certifying the level of direct GHG emissions referred to in point 1(b)(ii);
(b) assessing whether the activity is on a credible trajectory to comply with point 1(b)(vi).
On the basis of the reports transmitted to it, the Commission may address an opinion to the operators concerned. The
Commission shall take those reports into account when performing the review referred to in Article 19(5) of Regulation
(EU) 2020/852.15.7.2022 EN Official Journal of the European Union L 188/25
2. The activity meets either of the following criteria:
(a) at construction, measurement equipment for monitoring of physical emissions, such as those from methane
leakage, is installed or a leak detection and repair program is introduced;
(b) at operation, physical measurement of emissions are reported and any leak is eliminated.
Do no significant harm (‘DNSH’)
(2) Climate change adaptation The activity complies with the criteria set out in Appendix A to this Annex.
(3) Sustainable use and protection of water The activity complies with the criteria set out in Appendix B to this Annex.
and marine resources
(4) Transition to a circular economy N/A
(5) Pollution prevention and control The activity complies with the criteria set out in Appendix C to this Annex.
Emissions are within or lower than the emission levels associated with the
best available techniques (BAT-AEL) ranges set out in the latest relevant best
available techniques (BAT) conclusions, including the best available
techniques (BAT) conclusions for large combustion plants.
No significant cross-media effects occur.
For combustion plants with thermal input greater than 1 MW but below the
thresholds for the BAT conclusions for large combustion plants to apply,
emissions are below the emission limit values set out in Annex II, part 2, to
Directive (EU) 2015/2193.
(6) Protection and restoration of biodiversity The activity complies with the criteria set out in Appendix D to this Annex.
and ecosystems
_____________
(*1) Council Directive 2009/71/Euratom of 25 June 2009 establishing a Community framework for the nuclear safety of nuclear
installations (OJ L 172, 2.7.2009, p. 18).
(*2) Council Directive 2011/70/Euratom of 19 July 2011 establishing a Community framework for the responsible and safe management
of spent fuel and radioactive waste (OJ L 199, 2.8.2011, p. 48).
(*3) Council Directive 2013/59/Euratom of 5 December 2013 laying down basic safety standards for protection against the dangers
arising from exposure to ionising radiation, and repealing Directives 89/618/Euratom, 90/641/Euratom, 96/29/Euratom,
97/43/Euratom and 2003/122/Euratom (OJ L 13, 17.1.2014, p. 1).
(*4) Directive 2011/92/EU of the European Parliament and of the Council of 13 December 2011 on the assessment of the effects of
certain public and private projects on the environment (OJ L 26, 28.1.2012, p. 1).
(*5) Directive 2000/60/EC of the European Parliament and of the Council of 23 October 2000 establishing a framework for Community
action in the field of water policy (OJ L 327, 22.12.2000, p. 1).
(*6) Commission Recommendation 2006/851/Euratom of 24 October 2006 on the management of financial resources for the
decommissioning of nuclear installations, spent fuel and radioactive waste (OJ L 330, 28.11.2006, p. 31).
(*7) Council Directive 2013/51/Euratom of 22 October 2013 laying down requirements for the protection of the health of the general
public with regard to radioactive substances in water intended for human consumption (OJ L 296, 7.11.2013, p. 12).
(*8) Regulation (EU) 2018/1999 of the European Parliament and of the Council of 11 December 2018 on the Governance of the Energy
Union and Climate Action, amending Regulations (EC) No 663/2009 and (EC) No 715/2009 of the European Parliament and of the
Council, Directives 94/22/EC, 98/70/EC, 2009/31/EC, 2009/73/EC, 2010/31/EU, 2012/27/EU and 2013/30/EU of the European
Parliament and of the Council, Council Directives 2009/119/EC and (EU) 2015/652 and repealing Regulation (EU) No 525/2013 of
the European Parliament and of the Council (OJ L 328, 21.12.2018, p. 1)’.L 188/26 EN Official Journal of the European Union 15.7.2022
ANNEX II
In Annex II to Delegated Regulation (EU) 2021/2139, the following Sections 4.26, 4.27, 4.28, 4.29, 4.30, and 4.31 are
inserted:
“4.26. Pre-commercial stages of advanced technologies to produce energy from nuclear processes with minimal
waste from the fuel cycle
Description of the activity
Research, development, demonstration and deployment of innovative electricity generation facilities, licenced by Member
States’ competent authorities in accordance with applicable national law, that produce energy from nuclear processes with
minimal waste from the fuel cycle.
The activity is classified under NACE code M72 and M72.1 in accordance with the statistical classification of economic
activities established by Regulation (EC) No 1893/2006.
Technical screening criteria
Substantial contribution to climate change adaptation
1. The economic activity has implemented physical and non-physical solutions (‘adaptation solutions’) that substantially
reduce the most important physical climate risks that are material to that activity.
2. The physical climate risks that are material to the activity have been identified from those listed in Appendix A to this
Annex by performing a robust climate risk and vulnerability assessment with the following steps:
(a) screening of the activity to identify which physical climate risks from the list in Appendix A to this Annex may
affect the performance of the economic activity during its expected lifetime;
(b) where the activity is assessed to be at risk from one or more of the physical climate risks listed in Appendix A to this
Annex, a climate risk and vulnerability assessment to assess the materiality of the physical climate risks on the
economic activity;
(c) an assessment of adaptation solutions that can reduce the identified physical climate risk.
The climate risk and vulnerability assessment is proportionate to the scale of the activity and its expected lifespan, such
that:
(a) for activities with an expected lifespan of less than 10 years, the assessment is performed, at least by using climate
projections at the smallest appropriate scale;
(b) for all other activities, the assessment is performed using the highest available resolution, state-of-the-art climate
projections across the existing range of future scenarios(1) consistent with the expected lifetime of the activity,
including, at least, 10 to 30 year climate projections scenarios for major investments.
3. The climate projections and assessment of impacts are based on best practice and available guidance and take into
account the state-of-the-art science for vulnerability and risk analysis and related methodologies in line with the most
recent Intergovernmental Panel on Climate Change reports(2), scientific peer-reviewed publications and open source(3)
or paying models.
4. The adaptation solutions implemented:
(a) do not adversely affect the adaptation efforts or the level of resilience to physical climate risks of other people, of
nature, of cultural heritage, of assets and of other economic activities;
(1) Future scenarios include Intergovernmental Panel on Climate Change representative concentration pathways RCP2.6, RCP4.5, RCP6.0
and RCP8.5.
(2) Assessments Reports on Climate Change: Impacts, Adaptation and Vulnerability, published periodically by the Intergovernmental
Panel on Climate Change (IPCC), the United Nations body for assessing the science related to climate change produces, https://www.
ipcc.ch/reports/.
(3) Such as Copernicus services managed by the European Commission.15.7.2022 EN Official Journal of the European Union L 188/27
(b) favour nature-based solutions(4)or rely on blue or green infrastructure(5)to the extent possible;
(c) are consistent with local, sectoral, regional or national adaptation plans and strategies;
(d) are monitored and measured against pre-defined indicators and remedial action is considered where those
indicators are not met;
(e) where the solution implemented is physical and consists in an activity for which technical screening criteria have
been specified in this Annex, the solution complies with the do no significant harm technical screening criteria for
that activity.
5. The activity complies with the provisions laid down in the Euratom Treaty and the legislation adopted on its basis, in
particular, Directive 2013/59/Euratom, Directive 2009/71/Euratom, and Directive 2011/70/Euratom as well as
applicable Union environmental law adopted under Article 192 TFEU, in particular Directive 2011/92/EU and Directive
2000/60/EC.
6. The activity complies with national legislation that transposes Directive 2009/71/Euratom, including as regards the
evaluation, through stress-tests, of the resilience of the Union nuclear power plants against extreme natural hazards,
including earthquakes. Accordingly, the activity takes place on the territory of a Member State where the operator of a
nuclear installation:
(a) has submitted a demonstration of nuclear safety, whose scope and level of detail is commensurate with the potential
magnitude and nature of the hazard relevant for the nuclear installation and its site (Article 6, point (b), of Directive
2009/71/Euratom);
(b) has taken defence-in-depth measures to ensure, inter alia, that the impact of extreme external natural and
unintended man-made hazards is minimised (Article 8b(1), point (a), of Directive 2009/71/Euratom);
(c) has performed an appropriate site and installation-specific assessment when the operator concerned applies for a
licence to construct or operate a nuclear power plant (Article 8c(a) of Directive 2009/71/Euratom).
The activity fulfils the requirements of Directive 2009/71/Euratom, supported by the latest international guidance through
the IAEA and WENRA, contributing to increasing the resilience and the ability of new and existing nuclear power plants to
cope with extreme natural hazards, including floods and extreme weather conditions.
Do no significant harm (‘DNSH’)
(1) Climate change mitigation The direct GHG emissions of the activity are lower than 270 g CO2e/kWh.
(3) Sustainable use and protection of water The activity complies with the criteria set out in Appendix B to this Annex.
and marine resources Environmental degradation risks related to preserving water quality and
avoiding water stress are identified and addressed, in accordance with a
water use and protection management plan, developed in consultation
with stakeholders concerned.
In order to limit thermal anomalies associated with the discharge of waste
heat, operators of inland nuclear power plants utilising once-through wet
cooling by taking water from a river or a lake shall control:
(a) the maximum temperature of the recipient freshwater body after
mixing, and
(b) the maximum temperature difference between the discharged cooling
water and the recipient freshwater body.
(4) Nature-based solutions are defined as ‘solutions that are inspired and supported by nature, which are cost-effective, simultaneously
provide environmental, social and economic benefits and help build resilience. Such solutions bring more, and more diverse, nature
and natural features and processes into cities, landscapes and seascapes, through locally adapted, resource-efficient and systemic
interventions’. Therefore, nature-based solutions benefit biodiversity and support the delivery of a range of ecosystem services (version
of [adoption date]: https://ec.europa.eu/info/research-and-innovation/research-area/environment/nature-based-solutions_en/).
(5) See Communication from the Commission to the European Parliament, the Council, the European Economic and Social Committee
and the Committee of the Regions: Green Infrastructure (GI) – Enhancing Europe’s Natural Capital, COM/2013/249 final.L 188/28 EN Official Journal of the European Union 15.7.2022
The temperature control is implemented in accordance with the individual
licence conditions for the specific operations, where applicable, or threshold
values in line with the EU regulatory framework.
The activity complies with the Industry Foundation Classes (IFC) standards.
Nuclear activities are operated in compliance with requirements on water
intended for human consumption of Directive 2000/60/EC and of Directive
2013/51/Euratom laying down requirements for the protection of the
health of the general public with regard to radioactive substances in water
intended for human consumption.
(4) Transition to a circular economy A plan for the management of both non-radioactive and radioactive waste is
in place and ensures maximal reuse or recycling of such waste at end of life
in accordance with the waste hierarchy, including through contractual
agreements with waste management partners, the reflection in financial
projections or the official project documentation.
During operation and decommissioning, the amount of radioactive waste is
minimised and the amount of free-release materials is maximised in
accordance with Directive 2011/70/Euratom, and in compliance with the
radiation protection requirements laid down in Directive 2013/59/Euratom.
A financing scheme is in place to ensure adequate funding for all
decommissioning activities and for the management of spent fuel and
radioactive waste, in compliance with Directive 2011/70/Euratom and
Recommendation 2006/851/Euratom.
An Environmental Impact Assessment is completed prior to the
construction of a nuclear power plant, in accordance with Directive
2011/92/EU. The required mitigation and compensatory measures are
implemented.
The relevant elements in this Section are covered by Member States’ reports
to the Commission in accordance with Article 14(1) of Directive 2011/70/
Euratom.
(5) Pollution prevention and control The activity complies with the criteria set out in Appendix C to this Annex.
Non-radioactive emissions are within or lower than the emission levels
associated with the best available techniques (BAT-AEL) ranges set out in
the best available techniques (BAT) conclusions for large combustion
plants. No significant cross-media effects occur.
For nuclear power plants greater than 1 MW thermal input but below the
thresholds for the BAT conclusions for large combustion plants to apply,
emissions are below the emission limit values set out in Annex II, part 2, to
Directive (EU) 2015/2193.
Radioactive discharges to air, water bodies and ground (soil) comply with
individual licence conditions for the specific operations, where applicable,
and/or national threshold values in line with Directive 2013/51/Euratom
and Directive 2013/59/Euratom.
Spent fuel and radioactive waste is safely and responsibly managed in
accordance with Directive 2011/70/Euratom and Directive 2013/59/
Euratom.
An adequate capacity of interim storage is available for the project, while
national plans for disposal are in place to minimise the duration of interim
storage, in compliance with the provision of Directive 2011/70/Euratom
that considers radioactive waste storage, including long-term storage, as an
interim solution, but not an alternative to disposal.15.7.2022 EN Official Journal of the European Union L 188/29
The activity complies with the criteria set out in Appendix D to this Annex.
(6) Protection and restoration of biodiversity
An Environmental Impact Assessment is completed prior to the
and ecosystems
construction of a nuclear power plant, in accordance with Directive
2011/92/EU. The required mitigation and compensatory measures are
implemented.
For sites/operations located in or near biodiversity sensitive areas likely to
have a significant effect on biodiversity sensitive areas (including the
Natura 2000 network of protected areas, Unesco World Heritage sites
and Key Biodiversity Areas, as well as other protected areas), an
appropriate assessment, where applicable, has been conducted and
based on its conclusions the necessary mitigation measures are
implemented.
The sites/operations shall not be detrimental to the conservation status of
any of the habitats or species present in protected areas.
4.27. Construction and safe operation of new nuclear power plants, for the generation of electricity and/or heat,
including for hydrogen production, using best-available technologies
Description of the activity
Construction and safe operation of new nuclear installations, for which the construction permit has been issued by 2045
by Member States’ competent authorities in accordance with applicable national law, to produce electricity or process heat,
including for the purposes of district heating or industrial processes such as hydrogen production (new nuclear
installations), as well as their safety upgrades.
The activity is classified under NACE codes D35.11 and F42.22 in accordance with the statistical classification of economic
activities established by Regulation (EC) No 1893/2006.
Technical screening criteria
Substantial contribution to climate change adaptation
1. The economic activity has implemented physical and non-physical solutions (‘adaptation solutions’) that substantially
reduce the most important physical climate risks that are material to that activity.
2. The physical climate risks that are material to the activity have been identified from those listed in Appendix A to this
Annex by performing a robust climate risk and vulnerability assessment with the following steps:
(a) screening of the activity to identify which physical climate risks from the list in Appendix A to this Annex may
affect the performance of the economic activity during its expected lifetime;
(b) where the activity is assessed to be at risk from one or more of the physical climate risks listed in Appendix A to this
Annex, a climate risk and vulnerability assessment to assess the materiality of the physical climate risks on the
economic activity;
(c) an assessment of adaptation solutions that can reduce the identified physical climate risk.
The climate risk and vulnerability assessment is proportionate to the scale of the activity and its expected lifespan, such that:
(a) for activities with an expected lifespan of less than 10 years, the assessment is performed, at least by using climate
projections at the smallest appropriate scale;
(b) for all other activities, the assessment is performed using the highest available resolution, state-of-the-art climate
projections across the existing range of future scenarios(6) consistent with the expected lifetime of the activity,
including, at least, 10 to 30 year climate projections scenarios for major investments.
(6) Future scenarios include Intergovernmental Panel on Climate Change representative concentration pathways RCP2.6, RCP4.5, RCP6.0
and RCP8.5.L 188/30 EN Official Journal of the European Union 15.7.2022
3. The climate projections and assessment of impacts are based on best practice and available guidance and take into
account the state-of-the-art science for vulnerability and risk analysis and related methodologies in line with the most
recent Intergovernmental Panel on Climate Change reports(7), scientific peer-reviewed publications and open source(8)
or paying models.
4. The adaptation solutions implemented:
(a) do not adversely affect the adaptation efforts or the level of resilience to physical climate risks of other people, of
nature, of cultural heritage, of assets and of other economic activities;
(b) favour nature-based solutions(9)or rely on blue or green infrastructure(10)to the extent possible;
(c) are consistent with local, sectoral, regional or national adaptation plans and strategies;
(d) are monitored and measured against pre-defined indicators and remedial action is considered where those
indicators are not met;
(e) where the solution implemented is physical and consists in an activity for which technical screening criteria have
been specified in this Annex, the solution complies with the do no significant harm technical screening criteria for
that activity.
5. The activity complies with the provisions laid down in the Euratom Treaty and the legislation adopted on its basis, in
particular, Directive 2013/59/Euratom, Directive 2009/71/Euratom, and Directive 2011/70/Euratom as well as
applicable Union environmental law adopted under Article 192 TFEU, in particular Directive 2011/92/EU and Directive
2000/60/EC.
6. The activity complies with national legislation that transposes Directive 2009/71/Euratom, including as regards the
evaluation, through stress-tests, of the resilience of the Union nuclear power plants against extreme natural hazards,
including earthquakes. Accordingly, the activity takes place on the territory of a Member State where the operator of a
nuclear installation:
(a) has submitted a demonstration of nuclear safety, whose scope and level of detail is commensurate with the potential
magnitude and nature of the hazard relevant for the nuclear installation and its site (Article 6, point (b), of Directive
2009/71/Euratom);
(b) has taken defence-in-depth measures to ensure, inter alia, that the impact of extreme external natural and
unintended man-made hazards is minimised (Article 8b(1), point (a), of Directive 2009/71/Euratom);
(c) has performed an appropriate site and installation-specific assessment when the operator concerned applies for a
licence to construct or operate a nuclear power plant (Article 8c(a) of Directive 2009/71/Euratom).
The activity fulfils the requirements of Directive 2009/71/Euratom, supported by the latest international guidance through
the IAEA and WENRA, contributing to increasing the resilience and the ability of new and existing nuclear power plants to
cope with extreme natural hazards, including floods and extreme weather conditions.
Do no significant harm (‘DNSH’)
(1) Climate change mitigation The direct GHG emissions of the activity are lower than 270 g CO2e/kWh.
(3) Sustainable use and protection of water The activity complies with the criteria set out in Appendix B to this Annex.
and marine resources
(7) Assessments Reports on Climate Change: Impacts, Adaptation and Vulnerability, published periodically by the Intergovernmental
Panel on Climate Change (IPCC), the United Nations body for assessing the science related to climate change produces, https://www.
ipcc.ch/reports/.
(8) Such as Copernicus services managed by the European Commission.
(9) Nature-based solutions are defined as ‘solutions that are inspired and supported by nature, which are cost-effective, simultaneously
provide environmental, social and economic benefits and help build resilience. Such solutions bring more, and more diverse, nature
and natural features and processes into cities, landscapes and seascapes, through locally adapted, resource-efficient and systemic
interventions’. Therefore, nature-based solutions benefit biodiversity and support the delivery of a range of ecosystem services (version
of [adoption date]: https://ec.europa.eu/info/research-and-innovation/research-area/environment/nature-based-solutions_en/).
(10) See Communication from the Commission to the European Parliament, the Council, the European Economic and Social Committee
and the Committee of the Regions: Green Infrastructure (GI) – Enhancing Europe’s Natural Capital, COM/2013/249 final.15.7.2022 EN Official Journal of the European Union L 188/31
Environmental degradation risks related to preserving water quality and
avoiding water stress are identified and addressed, in accordance with a
water use and protection management plan, developed in consultation
with stakeholders concerned.
In order to limit thermal anomalies associated with the discharge of waste
heat, operators of inland nuclear power plants utilising once-through wet
cooling by taking water from a river or a lake shall control:
(a) the maximum temperature of the recipient freshwater body after
mixing, and
(b) the maximum temperature difference between the discharged cooling
water and the recipient freshwater body.
The temperature control is implemented in accordance with the individual
licence conditions for the specific operations, where applicable, and/or
threshold values in line with the EU regulatory framework.
The activity complies with the Industry Foundation Classes (IFC) standards.
Nuclear activities are operated in compliance with requirements on water
intended for human consumption of Directive 2000/60/EC and of Directive
2013/51/Euratom laying down requirements for the protection of the
health of the general public with regard to radioactive substances in water
intended for human consumption.
(4) Transition to a circular economy A plan for the management of both non-radioactive and radioactive waste is
in place and ensures maximal reuse or recycling of such waste at end of life
in accordance with the waste hierarchy, including through contractual
agreements with waste management partners, the reflection in financial
projections or the official project documentation.
During operation and decommissioning, the amount of radioactive waste is
minimised and the amount of free-release materials is maximised in
accordance with Directive 2011/70/Euratom, and in compliance with the
radiation protection requirements laid down in Directive 2013/59/Euratom.
A financing scheme is in place to ensure adequate funding for all
decommissioning activities and for the management of spent fuel and
radioactive waste, in compliance with Directive 2011/70/Euratom and
Recommendation 2006/851/Euratom.
An Environmental Impact Assessment is completed prior to the
construction of a nuclear power plant, in accordance with Directive
2011/92/EU. The required mitigation and compensatory measures are
implemented.
The relevant elements in this Section are covered by Member States’ reports
to the Commission in accordance with Article 14(1) of Directive 2011/70/
Euratom.
(5) Pollution prevention and control The activity complies with the criteria set out in Appendix C to this Annex.
Non-radioactive emissions are within or lower than the emission levels
associated with the best available techniques (BAT-AEL) ranges set out in
the best available techniques (BAT) conclusions for large combustion
plants. No significant cross-media effects occur.L 188/32 EN Official Journal of the European Union 15.7.2022
For nuclear power plants greater than 1 MW thermal input but below the
thresholds for the BAT conclusions for large combustion plants to apply,
emissions are below the emission limit values set out in Annex II, part 2, to
Directive (EU) 2015/2193.
Radioactive discharges to air, water bodies and ground (soil) comply with
individual licence conditions for the specific operations, where applicable,
and/or national threshold values in line with Directive 2013/51/Euratom
and Directive 2013/59/Euratom.
Spent fuel and radioactive waste is safely and responsibly managed in
accordance with Directive 2011/70/Euratom and Directive 2013/59/
Euratom.
An adequate capacity of interim storage is available for the project, while
national plans for disposal are in place to minimise the duration of interim
storage, in compliance with the provision of Directive 2011/70/Euratom
that considers radioactive waste storage, including long-term storage, as an
interim solution, but not an alternative to disposal.
(6) Protection and restoration of biodiversity The activity complies with the criteria set out in Appendix D to this Annex.
and ecosystems An Environmental Impact Assessment is completed prior to the
construction of a nuclear power plant, in accordance with Directive
2011/92/EU. The required mitigation and compensatory measures are
implemented.
For sites/operations located in or near biodiversity sensitive areas likely to
have a significant effect on biodiversity sensitive areas (including the
Natura 2000 network of protected areas, Unesco World Heritage sites and
Key Biodiversity Areas, as well as other protected areas), an appropriate
assessment, where applicable, has been conducted and based on its
conclusions the necessary mitigation measures are implemented.
The sites/operations shall not be detrimental to the conservation status of
any of the habitats or species present in protected areas.
4.28. Electricity generation from nuclear energy in existing installations
Description of the activity
Modification of existing nuclear installations for the purposes of extension, authorised by Member States’ competent
authorities by 2040 in accordance with applicable national law, of the service time of safe operation of nuclear
installations that produce electricity or heat from nuclear energy (‘nuclear power plants’).
The activity is classified under NACE codes D35.11 and F42.2 in accordance with the statistical classification of economic
activities established by Regulation (EC) No 1893/2006.
Technical screening criteria
Substantial contribution to climate change adaptation
1. The economic activity has implemented physical and non-physical solutions (‘adaptation solutions’) that substantially
reduce the most important physical climate risks that are material to that activity.
2. The physical climate risks that are material to the activity have been identified from those listed in Appendix A to this
Annex by performing a robust climate risk and vulnerability assessment with the following steps:
(a) screening of the activity to identify which physical climate risks from the list in Appendix A to this Annex may
affect the performance of the economic activity during its expected lifetime;
(b) where the activity is assessed to be at risk from one or more of the physical climate risks listed in Appendix A to this
Annex, a climate risk and vulnerability assessment to assess the materiality of the physical climate risks on the
economic activity;15.7.2022 EN Official Journal of the European Union L 188/33
(c) an assessment of adaptation solutions that can reduce the identified physical climate risk.
The climate risk and vulnerability assessment is proportionate to the scale of the activity and its expected lifespan, such that:
(a) for activities with an expected lifespan of less than 10 years, the assessment is performed, at least by using climate
projections at the smallest appropriate scale;
(b) for all other activities, the assessment is performed using the highest available resolution, state-of-the-art climate
projections across the existing range of future scenarios(11) consistent with the expected lifetime of the activity,
including, at least, 10 to 30 year climate projections scenarios for major investments.
3. The climate projections and assessment of impacts are based on best practice and available guidance and take into
account the state-of-the-art science for vulnerability and risk analysis and related methodologies in line with the most
recent Intergovernmental Panel on Climate Change reports(12), scientific peer-reviewed publications and open
source(13)or paying models.
4. The adaptation solutions implemented:
(a) do not adversely affect the adaptation efforts or the level of resilience to physical climate risks of other people, of
nature, of cultural heritage, of assets and of other economic activities;
(b) favour nature-based solutions(14)or rely on blue or green infrastructure(15)to the extent possible;
(c) are consistent with local, sectoral, regional or national adaptation plans and strategies;
(d) are monitored and measured against pre-defined indicators and remedial action is considered where those
indicators are not met;
(e) where the solution implemented is physical and consists in an activity for which technical screening criteria have
been specified in this Annex, the solution complies with the do no significant harm technical screening criteria for
that activity.
5. The activity complies with the provisions laid down in the Euratom Treaty and the legislation adopted on its basis, in
particular, Directive 2013/59/Euratom, Directive 2009/71/Euratom, and Directive 2011/70/Euratom as well as
applicable Union environmental law adopted under Article 192 TFEU, in particular Directive 2011/92/EU and Directive
2000/60/EC.
6. The activity complies with national legislation that transposes Directive 2009/71/Euratom, including as regards the
evaluation, through stress-tests, of the resilience of the Union nuclear power plants against extreme natural hazards,
including earthquakes. Accordingly, the activity takes place on the territory of a Member State where the operator of a
nuclear installation:
(a) has submitted a demonstration of nuclear safety, whose scope and level of detail is commensurate with the potential
magnitude and nature of the hazard relevant for the nuclear installation and its site (Article 6, point (b), of Directive
2009/71/Euratom);
(11) Future scenarios include Intergovernmental Panel on Climate Change representative concentration pathways RCP2.6, RCP4.5, RCP6.0
and RCP8.5.
(12) Assessments Reports on Climate Change: Impacts, Adaptation and Vulnerability, published periodically by the Intergovernmental
Panel on Climate Change (IPCC), the United Nations body for assessing the science related to climate change produces, https://www.
ipcc.ch/reports/.
(13) Such as Copernicus services managed by the European Commission.
(14) Nature-based solutions are defined as ‘solutions that are inspired and supported by nature, which are cost-effective, simultaneously provide
environmental, social and economic benefits and help build resilience. Such solutions bring more, and more diverse, nature and natural
features and processes into cities, landscapes and seascapes, through locally adapted, resource-efficient and systemic interventions’.
Therefore, nature-based solutions benefit biodiversity and support the delivery of a range of ecosystem services (version of [adoption date]:
https://ec.europa.eu/info/research-and-innovation/research-area/environment/nature-based-solutions_en/).
(15) See Communication from the Commission to the European Parliament, the Council, the European Economic and Social Committee
and the Committee of the Regions: Green Infrastructure (GI) – Enhancing Europe’s Natural Capital, COM/2013/249 final.L 188/34 EN Official Journal of the European Union 15.7.2022
(b) has taken defence-in-depth measures to ensure, inter alia, that the impact of extreme external natural and
unintended man-made hazards is minimised (Article 8b(1), point (a), of Directive 2009/71/Euratom);
(c) has performed an appropriate site and installation-specific assessment when the operator concerned applies for a
licence to construct or operate a nuclear power plant (Article 8c(a) of Directive 2009/71/Euratom).
The activity fulfils the requirements of Directive 2009/71/Euratom, supported by the latest international guidance through
the IAEA and WENRA, contributing to increasing the resilience and the ability of new and existing nuclear power plants to
cope with extreme natural hazards, including floods and extreme weather conditions.
Do no significant harm (‘DNSH’)
(1) Climate change mitigation The direct GHG emissions of the activity are lower than 270 g CO2e/kWh.
(3) Sustainable use and protection of water The activity complies with the criteria set out in Appendix B to this Annex.
and marine resources Environmental degradation risks related to preserving water quality and
avoiding water stress are identified and addressed, in accordance with a
water use and protection management plan, developed in consultation
with stakeholders concerned.
In order to limit thermal anomalies associated with the discharge of waste
heat, operators of inland nuclear power plants utilising once-through wet
cooling by taking water from a river or a lake shall control:
(a) the maximum temperature of the recipient freshwater body after
mixing, and
(b) the maximum temperature difference between the discharged cooling
water and the recipient freshwater body.
The temperature control is implemented in accordance with the individual
licence conditions for the specific operations, where applicable, or threshold
values in line with the Union law.
The activity complies with the Industry Foundation Classes (IFC) standards.
Nuclear activities are operated in compliance with requirements on water
intended for human consumption of Directive 2000/60/EC and of Directive
2013/51/Euratom laying down requirements for the protection of the
health of the general public with regard to radioactive substances in water
intended for human consumption.
(4) Transition to a circular economy A plan for the management of both non-radioactive and radioactive waste is
in place and ensures maximal reuse or recycling of such waste at end of life
in accordance with the waste hierarchy, including through contractual
agreements with waste management partners, the reflection in financial
projections or the official project documentation.
During operation and decommissioning, the amount of radioactive waste is
minimised and the amount of free-release materials is maximised in
accordance with Directive 2011/70/Euratom, and in compliance with the
radiation protection requirements laid down in Directive 2013/59/Euratom.
A financing scheme is in place to ensure adequate funding for all
decommissioning activities and for the management of spent fuel and
radioactive waste, in compliance with Directive 2011/70/Euratom and
Recommendation 2006/851/Euratom.15.7.2022 EN Official Journal of the European Union L 188/35
An Environmental Impact Assessment is completed prior to the
construction of a nuclear power plant, in accordance with Directive
2011/92/EU. The required mitigation and compensatory measures are
implemented.
The relevant elements in this Section are covered by Member States’ reports
to the Commission in accordance with Article 14(1) of Directive 2011/70/
Euratom.
(5) Pollution prevention and control The activity complies with the criteria set out in Appendix C to this Annex.
Non-radioactive emissions are within or lower than the emission levels
associated with the best available techniques (BAT-AEL) ranges set out in
the best available techniques (BAT) conclusions for large combustion
plants. No significant cross-media effects occur.
For nuclear power plants greater than 1 MW thermal input but below the
thresholds for the BAT conclusions for large combustion plants to apply,
emissions are below the emission limit values set out in Annex II, part 2, to
Directive (EU) 2015/2193.
Radioactive discharges to air, water bodies and ground (soil) comply with
individual licence conditions for the specific operations, where applicable,
and/or national threshold values in line with Directive 2013/51/Euratom
and Directive 2013/59/Euratom).
Spent fuel and radioactive waste is safely and responsibly managed in
accordance with Directive 2011/70/Euratom and Directive 2013/59/
Euratom.
An adequate capacity of interim storage is available for the project, while
national plans for disposal are in place to minimize the duration of interim
storage, in compliance with the provision of Directive 2011/70/Euratom
that considers radioactive waste storage, including long-term storage, as an
interim solution, but not an alternative to disposal.
(6) Protection and restoration of biodiversity The activity complies with the criteria set out in Appendix D to this Annex.
and ecosystems An Environmental Impact Assessment is completed prior to the
construction of a nuclear power plant, in accordance with Directive
2011/92/EU. The required mitigation and compensatory measures are
implemented.
For sites/operations located in or near biodiversity sensitive areas likely to
have a significant effect on biodiversity sensitive areas (including the
Natura 2000 network of protected areas, Unesco World Heritage sites and
Key Biodiversity Areas, as well as other protected areas), an appropriate
assessment, where applicable, has been conducted and based on its
conclusions the necessary mitigation measures are implemented.
The sites/operations shall not be detrimental to the conservation status of
any of the habitats or species present in protected areas.
4.29. Electricity generation from fossil gaseous fuels
Description of the activity
Construction or operation of electricity generation facilities that produce electricity using fossil gaseous fuels that meet the
criteria in point 1(a) of Section 4.29 of Annex I. This activity does not include electricity generation from the exclusive use
of renewable non-fossil gaseous and liquid fuels referred to in Section 4.7 of Annex I and biogas and bio-liquid fuels
referred to in Section 4.8 of Annex I.
The economic activities in this category may be associated with several NACE codes, notably D35.11 and F42.22 in
accordance with the statistical classification of economic activities established by Regulation (EC) No 1893/2006.L 188/36 EN Official Journal of the European Union 15.7.2022
Technical screening criteria
Substantial contribution to climate change adaptation
1. The economic activity has implemented physical and non-physical solutions (‘adaptation solutions’) that substantially
reduce the most important physical climate risks that are material to that activity.
2. The physical climate risks that are material to the activity have been identified from those listed in Appendix A to this
Annex by performing a robust climate risk and vulnerability assessment with the following steps:
(a) screening of the activity to identify which physical climate risks from the list in Appendix A to this Annex may
affect the performance of the economic activity during its expected lifetime;
(b) where the activity is assessed to be at risk from one or more of the physical climate risks listed in Appendix A to this
Annex, a climate risk and vulnerability assessment to assess the materiality of the physical climate risks on the
economic activity;
(c) an assessment of adaptation solutions that can reduce the identified physical climate risk.
The climate risk and vulnerability assessment is proportionate to the scale of the activity and its expected lifespan, such
that:
(a) for activities with an expected lifespan of less than 10 years, the assessment is performed, at least by using climate
projections at the smallest appropriate scale;
(b) for all other activities, the assessment is performed using the highest available resolution, state-of-the-art climate
projections across the existing range of future scenarios(16) consistent with the expected lifetime of the activity,
including, at least, 10 to 30 year climate projections scenarios for major investments.
3. The climate projections and assessment of impacts are based on best practice and available guidance and take into
account the state-of-the-art science for vulnerability and risk analysis and related methodologies in line with the most
recent Intergovernmental Panel on Climate Change reports(17), scientific peer-reviewed publications and open
source(18)or paying models.
4. The adaptation solutions implemented:
(a) do not adversely affect the adaptation efforts or the level of resilience to physical climate risks of other people, of
nature, of cultural heritage, of assets and of other economic activities;
(b) favour nature-based solutions(19)or rely on blue or green infrastructure(20)to the extent possible;
(c) are consistent with local, sectoral, regional or national adaptation plans and strategies;
(d) are monitored and measured against pre-defined indicators and remedial action is considered where those
indicators are not met;
(e) where the solution implemented is physical and consists in an activity for which technical screening criteria have
been specified in this Annex, the solution complies with the do no significant harm technical screening criteria for
that activity.
(16) Future scenarios include Intergovernmental Panel on Climate Change representative concentration pathways RCP2.6, RCP4.5, RCP6.0
and RCP8.5.
(17) Assessments Reports on Climate Change: Impacts, Adaptation and Vulnerability, published periodically by the Intergovernmental
Panel on Climate Change (IPCC), the United Nations body for assessing the science related to climate change produces, https://www.
ipcc.ch/reports/.
(18) Such as Copernicus services managed by the European Commission.
(19) Nature-based solutions are defined as ‘solutions that are inspired and supported by nature, which are cost-effective, simultaneously
provide environmental, social and economic benefits and help build resilience. Such solutions bring more, and more diverse, nature
and natural features and processes into cities, landscapes and seascapes, through locally adapted, resource-efficient and systemic
interventions’. Therefore, nature-based solutions benefit biodiversity and support the delivery of a range of ecosystem services
(version of [adoption date]: https://ec.europa.eu/info/research-and-innovation/research-area/environment/nature-based-solutions_en/
).
(20) See Communication from the Commission to the European Parliament, the Council, the European Economic and Social Committee
and the Committee of the Regions: Green Infrastructure (GI) – Enhancing Europe’s Natural Capital, COM/2013/249 final.15.7.2022 EN Official Journal of the European Union L 188/37
Do no significant harm (‘DNSH’)
(1) Climate change mitigation The direct GHG emissions of the activity are lower than 270 g CO2e/kWh.
(3) Sustainable use and protection of water The activity complies with the criteria set out in Appendix B to this Annex.
and marine resources
(4) Transition to a circular economy N/A
(5) Pollution prevention and control The activity complies with the criteria set out in Appendix C to this Annex.
Emissions are within or lower than the emission levels associated with the
best available techniques (BAT-AEL) ranges set out in the latest relevant best
available techniques (BAT) conclusions, including the best available
techniques (BAT) conclusions for large combustion plants.
No significant cross-media effects occur.
For combustion plants with thermal input greater than 1 MW but below the
thresholds for the BAT conclusions for large combustion plants to apply,
emissions are below the emission limit values set out in Annex II, part 2, to
Directive (EU) 2015/2193.
(6) Protection and restoration of biodiversity The activity complies with the criteria set out in Appendix D to this Annex.
and ecosystems
4.30. High-efficiency co- generation of heat/cool and power from fossil gaseous fuels
Description of the activity
Construction, refurbishment and operation of combined heat/cool and power generation facilities using fossil gaseous fuels
that meet the criteria in point 1(a) of Section 4.30 of Annex I. This activity does not include high-efficiency co-generation of
heat/cool and power from the exclusive use of renewable non-fossil gaseous and liquid fuels referred to in Section 4.19 of
Annex I and biogas and bio-liquid fuels referred to in Section 4.20 of Annex I.
The economic activities in this category may be associated with NACE codes D35.11 and D35.30 in accordance with the
statistical classification of economic activities established by Regulation (EC) No 1893/2006.
Technical screening criteria
Substantial contribution to climate change adaptation
1. The economic activity has implemented physical and non-physical solutions (‘adaptation solutions’) that substantially
reduce the most important physical climate risks that are material to that activity.
2. The physical climate risks that are material to the activity have been identified from those listed in Appendix A to this
Annex by performing a robust climate risk and vulnerability assessment with the following steps:
(a) screening of the activity to identify which physical climate risks from the list in Appendix A to this Annex may
affect the performance of the economic activity during its expected lifetime;
(b) where the activity is assessed to be at risk from one or more of the physical climate risks listed in Appendix A to this
Annex, a climate risk and vulnerability assessment to assess the materiality of the physical climate risks on the
economic activity;
(c) an assessment of adaptation solutions that can reduce the identified physical climate risk.
The climate risk and vulnerability assessment is proportionate to the scale of the activity and its expected lifespan, such
that:
(a) for activities with an expected lifespan of less than 10 years, the assessment is performed, at least by using climate
projections at the smallest appropriate scale;L 188/38 EN Official Journal of the European Union 15.7.2022
(b) for all other activities, the assessment is performed using the highest available resolution, state-of-the-art climate
projections across the existing range of future scenarios(21) consistent with the expected lifetime of the activity,
including, at least, 10 to 30 year climate projections scenarios for major investments.
3. The climate projections and assessment of impacts are based on best practice and available guidance and take into
account the state-of-the-art science for vulnerability and risk analysis and related methodologies in line with the most
recent Intergovernmental Panel on Climate Change reports(22), scientific peer-reviewed publications and open
source(23)or paying models.
4. The adaptation solutions implemented:
(a) do not adversely affect the adaptation efforts or the level of resilience to physical climate risks of other people, of
nature, of cultural heritage, of assets and of other economic activities;
(b) favour nature-based solutions(24)or rely on blue or green infrastructure(25)to the extent possible;
(c) are consistent with local, sectoral, regional or national adaptation plans and strategies;
(d) are monitored and measured against pre-defined indicators and remedial action is considered where those
indicators are not met;
(e) where the solution implemented is physical and consists in an activity for which technical screening criteria have
been specified in this Annex, the solution complies with the do no significant harm technical screening criteria for
that activity.
Do no significant harm (‘DNSH’)
(1) Climate change mitigation The direct GHG emissions of the activity are lower than 270 g CO2e/kWh.
(3) Sustainable use and protection of water The activity complies with the criteria set out in Appendix B to this Annex.
and marine resources
(4) Transition to a circular economy N/A
(5) Pollution prevention and control The activity complies with the criteria set out in Appendix C to this Annex.
Emissions are within or lower than the emission levels associated with the
best available techniques (BAT-AEL) ranges set out in the latest relevant best
available techniques (BAT) conclusions, including the best available
techniques (BAT) conclusions for large combustion plants.
No significant cross-media effects occur.
For combustion plants with thermal input greater than 1 MW but below the
thresholds for the BAT conclusions for large combustion plants to apply,
emissions are below the emission limit values set out in Annex II, part 2, to
Directive (EU) 2015/2193.
(6) Protection and restoration of biodiversity The activity complies with the criteria set out in Appendix D to this Annex.
and ecosystems
(21) Future scenarios include Intergovernmental Panel on Climate Change representative concentration pathways RCP2.6, RCP4.5, RCP6.0
and RCP8.5.
(22) Assessments Reports on Climate Change: Impacts, Adaptation and Vulnerability, published periodically by the Intergovernmental
Panel on Climate Change (IPCC), the United Nations body for assessing the science related to climate change produces, https://www.
ipcc.ch/reports/.
(23) Such as Copernicus services managed by the European Commission.
(24) Nature-based solutions are defined as ‘solutions that are inspired and supported by nature, which are cost-effective, simultaneously
provide environmental, social and economic benefits and help build resilience. Such solutions bring more, and more diverse, nature
and natural features and processes into cities, landscapes and seascapes, through locally adapted, resource-efficient and systemic
interventions’. Therefore, nature-based solutions benefit biodiversity and support the delivery of a range of ecosystem services (version
of [adoption date]: https://ec.europa.eu/info/research-and-innovation/research-area/environment/nature-based-solutions_en/).
(25) See Communication from the Commission to the European Parliament, the Council, the European Economic and Social Committee
and the Committee of the Regions: Green Infrastructure (GI) – Enhancing Europe’s Natural Capital, COM/2013/249 final.15.7.2022 EN Official Journal of the European Union L 188/39
4.31. Production of heat/cool from fossil gaseous fuels in an efficient district heating and cooling system
Description of the activity
Construction, refurbishment and operation of heat generation facilities that produce heat/cool using fossil gaseous fuels
connected to efficient district heating and cooling within the meaning of Article 2(41) of Directive 2012/27/EUthat meet
the criteria in point 1(a) of Section 4.31 of Annex I. This activity does not include production of heat/cool from in an
efficient district heating from the exclusive use of renewable non-fossil gaseous and liquid fuels referred to in Section 4.23
of Annex I and biogas and bio-liquid fuels referred to in Section 4.24 of Annex I.
The activity is classified under NACE code D35.30 in accordance with the statistical classification of economic activities
established by Regulation (EC) No 1893/2006.
Technical screening criteria
Substantial contribution to climate change adaptation
1. The economic activity has implemented physical and non-physical solutions (‘adaptation solutions’) that substantially
reduce the most important physical climate risks that are material to that activity.
2. The physical climate risks that are material to the activity have been identified from those listed in Appendix A to this
Annex by performing a robust climate risk and vulnerability assessment with the following steps:
(a) screening of the activity to identify which physical climate risks from the list in Appendix A to this Annex may
affect the performance of the economic activity during its expected lifetime;
(b) where the activity is assessed to be at risk from one or more of the physical climate risks listed in Appendix A to this
Annex, a climate risk and vulnerability assessment to assess the materiality of the physical climate risks on the
economic activity;
(c) an assessment of adaptation solutions that can reduce the identified physical climate risk.
The climate risk and vulnerability assessment is proportionate to the scale of the activity and its expected lifespan, such
that:
(a) for activities with an expected lifespan of less than 10 years, the assessment is performed, at least by using climate
projections at the smallest appropriate scale;
(b) for all other activities, the assessment is performed using the highest available resolution, state-of-the-art climate
projections across the existing range of future scenarios(26) consistent with the expected lifetime of the activity,
including, at least, 10 to 30 year climate projections scenarios for major investments.
3. The climate projections and assessment of impacts are based on best practice and available guidance and take into
account the state-of-the-art science for vulnerability and risk analysis and related methodologies in line with the most
recent Intergovernmental Panel on Climate Change reports(27), scientific peer-reviewed publications and open
source(28)or paying models.
4. The adaptation solutions implemented:
(a) do not adversely affect the adaptation efforts or the level of resilience to physical climate risks of other people, of
nature, of cultural heritage, of assets and of other economic activities;
(b) favour nature-based solutions(29)or rely on blue or green infrastructure(30)to the extent possible;
(c) are consistent with local, sectoral, regional or national adaptation plans and strategies;
(d) are monitored and measured against pre-defined indicators and remedial action is considered where those
indicators are not met;
(e) where the solution implemented is physical and consists in an activity for which technical screening criteria have
been specified in this Annex, the solution complies with the do no significant harm technical screening criteria for
that activity.
(26) Future scenarios include Intergovernmental Panel on Climate Change representative concentration pathways RCP2.6, RCP4.5, RCP6.0
and RCP8.5.
(27) Assessments Reports on Climate Change: Impacts, Adaptation and Vulnerability, published periodically by the Intergovernmental
Panel on Climate Change (IPCC), the United Nations body for assessing the science related to climate change produces, https://www.
ipcc.ch/reports/.
(28) Such as Copernicus services managed by the European Commission.
(29) Nature-based solutions are defined as ‘solutions that are inspired and supported by nature, which are cost-effective, simultaneously
provide environmental, social and economic benefits and help build resilience. Such solutions bring more, and more diverse, nature
and natural features and processes into cities, landscapes and seascapes, through locally adapted, resource-efficient and systemic
interventions’. Therefore, nature-based solutions benefit biodiversity and support the delivery of a range of ecosystem services (version
of [adoption date]: https://ec.europa.eu/info/research-and-innovation/research-area/environment/nature-based-solutions_en/).
(30) See Communication from the Commission to the European Parliament, the Council, the European Economic and Social Committee
and the Committee of the Regions: Green Infrastructure (GI) – Enhancing Europe’s Natural Capital, COM/2013/249 final.L 188/40 EN Official Journal of the European Union 15.7.2022
Do no significant harm (‘DNSH’)
(1) Climate change mitigation The direct GHG emissions of the activity are lower than 270 g CO2e/kWh.
(3) Sustainable use and protection of water The activity complies with the criteria set out in Appendix B to this Annex.
and marine resources
(4) Transition to a circular economy N/A
(5) Pollution prevention and control The activity complies with the criteria set out in Appendix C to this Annex.
Emissions are within or lower than the emission levels associated with the
best available techniques (BAT-AEL) ranges set out in the latest relevant best
available techniques (BAT) conclusions, including the best available
techniques (BAT) conclusions for large combustion plants.
No significant cross-media effects occur.
For combustion plants with thermal input greater than 1 MW but below the
thresholds for the BAT conclusions for large combustion plants to apply,
emissions are below the emission limit values set out in Annex II, part 2, to
Directive (EU) 2015/2193.
(6) Protection and restoration of biodiversity The activity complies with the criteria set out in Appendix D to this Annex.”
and ecosystems15.7.2022 EN Official Journal of the European Union L 188/41
ANNEX III
‘ANNEX XII
Standard templates for the disclosure referred to in Article 8(6) and (7)
The information referred to in Article 8(6) and (7) shall be presented as follows, for each applicable key performance
indicator (KPI).
Template 1 Nuclear and fossil gas related activities
Row Nuclear energy related activities
1. The undertaking carries out, funds or has exposures to research, development, YES/NO
demonstration and deployment of innovative electricity generation facilities
that produce energy from nuclear processes with minimal waste from the fuel
cycle.
2. The undertaking carries out, funds or has exposures to construction and safe YES/NO
operation of new nuclear installations to produce electricity or process heat,
including for the purposes of district heating or industrial processes such as
hydrogen production, as well as their safety upgrades, using best available
technologies.
3. The undertaking carries out, funds or has exposures to safe operation of existing YES/NO
nuclear installations that produce electricity or process heat, including for the
purposes of district heating or industrial processes such as hydrogen production
from nuclear energy, as well as their safety upgrades.
Fossil gas related activities
4. The undertaking carries out, funds or has exposures to construction or operation YES/NO
of electricity generation facilities that produce electricity using fossil gaseous
fuels.
5. The undertaking carries out, funds or has exposures to construction, refurbishment, YES/NO
and operation of combined heat/cool and power generation facilities using fossil
gaseous fuels.
6. The undertaking carries out, funds or has exposures to construction, refurbishment YES/NO
and operation of heat generation facilities that produce heat/cool using fossil gaseous
fuels.
Template 2 Taxonomy-aligned economic activities (denominator)
Amount and proportion (the information is to be presented in monetary
amounts and as percentages)
Row Economic activities Climate change Climate change
CCM + CCA
mitigation (CCM) adaptation (CCA)
Amount % Amount % Amount %
1. Amount and proportion of taxonomy-
aligned economic activity referred to in
Section 4.26 of Annexes I and II to
Delegated Regulation 2021/2139 in the
denominator of the applicable KPIL 188/42 EN Official Journal of the European Union 15.7.2022
2. Amount and proportion of taxonomy-
aligned economic activity referred to in
Section 4.27 of Annexes I and II to
Delegated Regulation 2021/2139 in the
denominator of the applicable KPI
3. Amount and proportion of taxonomy-
aligned economic activity referred to in
Section 4.28 of Annexes I and II to
Delegated Regulation 2021/2139 in the
denominator of the applicable KPI
4. Amount and proportion of taxonomy-
aligned economic activity referred to in
Section 4.29 of Annexes I and II to
Delegated Regulation 2021/2139 in the
denominator of the applicable KPI
5. Amount and proportion of taxonomy-
aligned economic activity referred to in
Section 4.30 of Annexes I and II to
Delegated Regulation 2021/2139 in the
denominator of the applicable KPI
6. Amount and proportion of taxonomy-
aligned economic activity referred to in
Section 4.31 of Annexes I and II to
Delegated Regulation 2021/2139 in the
denominator of the applicable KPI
7. Amount and proportion of other
taxonomy-aligned economic activities
not referred to in rows 1 to 6 above in
the denominator of the applicable KPI
8. Total applicable KPI
Template 3 Taxonomy-aligned economic activities (numerator)
Amount and proportion (the information is to be presented in monetary
amounts and as percentages)
Row Economic activities Climate change Climate change
(CCM+CCA)
mitigation adaptation
Amount % Amount % Amount %
1. Amount and proportion of taxonomy-
aligned economic activity referred to in
Section 4.26 of Annexes I and II to
Delegated Regulation 2021/2139 in the
numerator of the applicable KPI15.7.2022 EN Official Journal of the European Union L 188/43
2. Amount and proportion of taxonomy-
aligned economic activity referred to in
Section 4.27 of Annexes I and II to
Delegated Regulation 2021/2139 in the
numerator of the applicable KPI
3. Amount and proportion of taxonomy-
aligned economic activity referred to in
Section 4.28 of Annexes I and II to
Delegated Regulation 2021/2139 in the
numerator of the applicable KPI
4. Amount and proportion of taxonomy-
aligned economic activity referred to in
Section 4.29 of Annexes I and II to
Delegated Regulation 2021/2139 in the
numerator of the applicable KPI
5. Amount and proportion of taxonomy-
aligned economic activity referred to in
Section 4.30 of Annexes I and II to
Delegated Regulation 2021/2139 in the
numerator of the applicable KPI
6. Amount and proportion of taxonomy-
aligned economic activity referred to in
Section 4.31 of Annexes I and II to
Delegated Regulation 2021/2139 in the
numerator of the applicable KPI
7. Amount and proportion of other
taxonomy-aligned economic activities
not referred to in rows 1 to 6 above in
the numerator of the applicable KPI
8. Total amount and proportion of 100%
taxonomy-aligned economic
activities in the numerator of the
applicable KPI
Template 4 Taxonomy-eligible but not taxonomy-aligned economic activities
Proportion (the information is to be presented in monetary amounts and
as percentages)
Row Economic activities Climate change Climate change
(CCM+CCA)
mitigation adaptation
Amount % Amount % Amount %
1. Amount and proportion of taxonomy-
eligible but not taxonomy-aligned
economic activity referred to in Section
4.26 of Annexes I and II to Delegated
Regulation 2021/2139 in the
denominator of the applicable KPI
2. Amount and proportion of taxonomy-
eligible but not taxonomy-aligned
economic activity referred to in Section
4.27 of Annexes I and II to Delegated
Regulation 2021/2139 in the
denominator of the applicable KPIL 188/44 EN Official Journal of the European Union 15.7.2022
3. Amount and proportion of taxonomy-
eligible but not taxonomy-aligned
economic activity referred to in Section
4.28 of Annexes I and II to Delegated
Regulation 2021/2139 in the
denominator of the applicable KPI
4. Amount and proportion of taxonomy-
eligible but not taxonomy-aligned
economic activity referred to in Section
4.29 of Annexes I and II to Delegated
Regulation 2021/2139 in the
denominator of the applicable KPI
5. Amount and proportion of taxonomy-
eligible but not taxonomy-aligned
economic activity referred to in Section
4.30 of Annexes I and II to Delegated
Regulation 2021/2139 in the
denominator of the applicable KPI
6. Amount and proportion of taxonomy-
eligible but not taxonomy-aligned
economic activity referred to in Section
4.31 of Annexes I and II to Delegated
Regulation 2021/2139 in the
denominator of the applicable KPI
7. Amount and proportion of other
taxonomy-eligible but not
taxonomy-aligned economic
activities not referred to in rows 1 to
6 above in the denominator of the
applicable KPI
8. Total amount and proportion of
taxonomy eligible but not taxonomy-
aligned economic activities in the
denominator of the applicable KPI15.7.2022 EN Official Journal of the European Union L 188/45
Template 5 Taxonomy non-eligible economic activities
Row Economic activities Amount Percentage
1. Amount and proportion of economic activity referred to in row 1
of Template 1 that is taxonomy-non-eligible in accordance with
Section 4.26 of Annexes I and II to Delegated Regulation
2021/2139 in the denominator of the applicable KPI
2. Amount and proportion of economic activity referred to in row 2
of Template 1 that is taxonomy-non-eligible in accordance with
Section 4.27 of Annexes I and II to Delegated Regulation
2021/2139 in the denominator of the applicable KPI
3. Amount and proportion of economic activity referred to in row 3
of Template 1 that is taxonomy-non-eligible in accordance with
Section 4.28 of Annexes I and II to Delegated Regulation
2021/2139 in the denominator of the applicable KPI
4. Amount and proportion of economic activity referred to in row 4
of Template 1 that is taxonomy-non-eligible in accordance with
Section 4.29 of Annexes I and II to Delegated Regulation
2021/2139 in the denominator of the applicable KPI
5. Amount and proportion of economic activity referred to in row 5
of Template 1 that is taxonomy-non-eligible in accordance with
Section 4.30 of Annexes I and II to Delegated Regulation
2021/2139 in the denominator of the applicable KPI
6. Amount and proportion of economic activity referred to in row 6
of Template 1 that is taxonomy-non-eligible in accordance with
Section 4.31 of Annexes I and II to Delegated Regulation
2021/2139 in the denominator of the applicable KPI
7. Amount and proportion of other taxonomy-non-eligible
economic activities not referred to in rows 1 to 6 above in the
denominator of the applicable KPI
8. Total amount and proportion of taxonomy-non-eligible
economic activities in the denominator of the applicable KPI’