Home Europe European Commission Commission Implementing Decision (EU) 2025/1968 of 28 April ...
Date: 2025-09-29 Category: Not Applicable State: Union Government Country: Europe

Commission Implementing Decision (EU) 2025/1968 of 28 April 2025 laying down rules for the application of Directive (EU) 2016/797 of the European Parliament and of the Council as regards a request from Italy not to apply the requirement to install GSM-R in a tunnel set out in Commission Regulation (EU) No 1303/2014 (notified under document C(2025) 2437)

Issued by European Commission · Directorate-General for Mobility and Transport

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** This Commission Implementing Decision (EU) 2025/1968, dated April 28, 2025, addresses Italy's request for an exemption from the GSM-R installation requirement in a new tunnel, as outlined in Commission Regulation (EU) No 1303/2014. The decision accepts Italy's request, contingent upon the application of an alternative provision, until December 31, 2029. Italy is required to inform the Commission if the non-application compromises railway safety. **Key Points / Main Content** * **Exemption Request:** * Italy requested an exemption from point 4.2.1.8 (a) of the Annex to Regulation (EU) No 1303/2014 for a new tunnel on the Mungivacca – Noicattaro line until December 31, 2029. * The request was made under Article 7(1)(c) of Directive (EU) 2016/797. * Complying would require approximately EUR 4 million in additional costs to equip 60km of track. * **Alternative Provision:** * Italy proposes to apply point 1.1.1 of Annex 2 of the Ministerial Decree October 28 2005, concerning radio communication system for railway tunnels. * Mobile communications infrastructure with signals in the GSM Primary band and ultra high frequency security infrastructure (400-470 MHz) would be used. * **Decision and Conditions:** * The Commission accepts Italy's request based on the justification and proposed alternative provision. * The acceptance is conditional on Italy applying the proposed alternative provision. * The decision applies until December 31, 2029. * **Safety Requirement:** * Italy must inform the Commission without delay if it has information that the non-application might compromise railway system safety. **Impact Analysis** **Impact** *Italy's national railway system is given flexibility in implementing railway communications technology with cost benefits. **Action Required** *Apply the alternative provision for radio communication in the new tunnel. *Inform the Commission if non-application of GSM-R compromises railway safety. **Impact** *The Commission needs to be informed if the safety of the railway system is affected by the application of the new decision. **Action Required** *The Commission does not have to take immediate action. It needs to monitor information provided by Italy related to the safety of the railway system.

Key Entities Referenced

Directive (EU) 2016/797: Directive of the European Parliament and of the Council on the interoperability of the rail system within the European Union, central to the application of rules regarding GSM-R installation in tunnels. Regulation (EU) No 1303/2014: Commission Regulation concerning the technical specification for interoperability relating to 'safety in railway tunnels' of the rail system of the European Union, specifically regarding the requirement of GSM-R in tunnels. Italy: The country that requested a non-application of GSM-R requirement in a specific tunnel, making it a central entity in understanding the decision's applicability. Mungivacca - Noicattaro line: Railway line in Italy where the new tunnel is located, subject to the decision regarding the GSM-R installation requirement.
Official Source Record View Original Source →
See Full Document Text
Official Journal EN of the European Union L series 2025/1968 29.9.2025 COMMISSION IMPLEMENTING DECISION(EU) 2025/1968 of 28 April 2025 laying down rules for the application of Directive (EU) 2016/797 of the European Parliament and of the Council as regards a request from Italy not to apply the requirement to install GSM-R in a tunnel set out in Commission Regulation (EU) No 1303/2014 (notified under document C(2025) 2437) (Only the Italian text is authentic) THE EUROPEAN COMMISSION, Having regard to the Treaty on the Functioning of the European Union, Having regard to Directive (EU) 2016/797 of the European Parliament and of the Council of 11 May 2016 on the interoperability of the rail system within the European Union(1), and in particular Article 7(4) thereof, Whereas: (1) On 11 December 2023, Italy submitted to the Commission a request for non-application of point 4.2.1.8 (a) of the Annex to Commission Regulation (EU) No 1303/2014(2) to the new tunnel on the Mungivacca – Noicattaro line until 31 December 2029 (the ‘request’). The request was submitted on the basis of Article 7(1), point (c), of Directive (EU) 2016/797. (2) Point 4.2.1.8 (a) of the Annex to Regulation (EU) No 1303/2014 sets out the requirement that radio communication between the train and the infrastructure manager control centre is to be provided in each tunnel of more than 1 km in length with Global System for Mobile Communications – Railway (GSM-R). (3) The project referred to in the request consists of building a new tunnel with a length of 3 155 m from km 7 + 304 to km 10 + 459 as part of a larger project to double the track of the Bari – Taranto railway line between Mungivacca and Noicattaro. (4) According to the documents submitted by Italy, complying with point 4.2.1.8 (a) of the Annex to Regulation (EU) No 1303/2014 would entail an additional cost of EUR 4 million, as approximately 60 km of track in the surrounding area would need to be equipped with GSM-R. (5) As an alternative provision, Italy proposes to apply point 1.1.1 of Annex 2, Part One, to Ministerial Decree 28 October 2005 – Safety in railway tunnels (‘Radio communication system’), which lays down that a system is to be provided to enable radio communication between staff on board trains and between them and the control centre. This national rule has been notified to the Commission and to the European Union Agency for Railways pursuant to Article 14(1), point (c), of Directive (EU) 2016/797, under rule IT-FI-1586-1-A. (6) In practice, mobile communication infrastructure with signals in the GSM Primary band that is capable of repetition of signals to the four main mobile operators would be used as well as ultra high frequency security infrastructure with signals in the 400-470 MHz band, which serves fire brigade teams. According to the documentation provided by Italy, the suitability of those alternative arrangements has been positively assessed by the National Agency for the Safety of Railways and Road and Highway Infrastructure. (1) OJ L 138, 26.5.2016, p. 44, ELI: http://data.europa.eu/eli/dir/2016/797/oj. (2) Commission Regulation (EU) No 1303/2014 of 18 November 2014 concerning the technical specification for interoperability relating to ‘safety in railway tunnels’ of the rail system of the European Union (OJ L 356, 12.12.2014, p. 394, ELI: http://data.europa.eu/eli/reg/ 2014/1303/oj). ELI: http://data.europa.eu/eli/dec_impl/2025/1968/oj 1/2EN OJ L, 29.9.2025 (7) Based on the justification for the request provided by Italy and the alternative provision proposed, the conditions set out in Article 7(1), point (c), and Article 7(4) of Directive (EU) 2016/797 can be considered as fulfilled for the new tunnel on the Mungivacca – Noicattaro line. The request should therefore be accepted. (8) Safety, as set out by Directive (EU) 2016/797, is an essential requirement which shall be met by the Union rail system, the subsystems and the interoperability constituents, including interfaces. The Commission should therefore be provided with any information indicating that the non-application of point 4.2.1.8 (a) of the Annex to Commission Regulation (EU) No 1303/2014 could compromise the safety of the railway system. (9) The measures provided for in this Decision are in accordance with the opinion of the Committee referred to in Article 51(1) of Directive (EU) 2016/797, HAS ADOPTED THIS DECISION: Article 1 The request of Italy for non-application of point 4.2.1.8 (a) of the Annex to Regulation (EU) No 1303/2014 to the new tunnel on the Mungivacca – Noicattaro line is accepted on the condition that the alternative provision proposed by Italy is applied. Italy shall without undue delay inform the Commission in case it has information that the non-application may reasonably compromise the safety of the railway system. Article 2 This Decision is addressed to the Italian Republic. It shall apply until 31 December 2029. Done at Brussels, 28 April 2025. For the Commission Apostolos TZITZIKOSTAS Member of the Commission 2/2 ELI: http://data.europa.eu/eli/dec_impl/2025/1968/oj

Continue your research