Home Europe European Commission Commission Implementing Decision (EU) 2025/2591 of 18 Decemb...
Date: 2025-12-19 Category: Not Applicable State: Union Government Country: Europe

Commission Implementing Decision (EU) 2025/2591 of 18 December 2025 granting a derogation to certain Member States pursuant to Regulation (EU) No 952/2013 of the European Parliament and of the Council to use means other than electronic data-processing techniques for the exchange and storage of information instead of component 2, phase 6, of the New Computerised Transit System (notified under document C(2025) 8776)

Issued by European Commission · Directorate-General for Taxation and Customs Union

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** Commission Implementing Decision (EU) 2025/2591, dated 18 December 2025, grants a derogation to Bulgaria, Croatia, Latvia, Poland, Romania, and Slovakia from using electronic data-processing techniques for specific customs information exchanges, instead of component 2, phase 6, of the New Computerised Transit System (NCTS). This is due to circumstances preventing full interconnection between NCTSP6 and ICS2, in line with Article 6(4) of Regulation (EU) No 952/2013. The derogation applies from 1 September 2025 and expires 31 May 2026 for road and rail consignments and 31 December 2025 for postal consignments. **Key Points / Main Content** * **Derogation Granted:** Bulgaria, Croatia, Latvia, Poland, Romania, and Slovakia are granted a derogation to use means other than electronic data-processing techniques instead of using NCTSP6 and the common component of ICS2 release 3, as referred to in Article 273 of Regulation (EU) 2015/2447 and Article 182 of that Regulation. * **Scope of Derogation:** Applies to: * Road and rail consignments. * Postal consignments. * **Safety and Security Data:** The derogation necessitates those Member States to ensure that economic operators may lodge the safety and security data using either ICS1 or, where applicable, ICS1 in combination with the transit declaration in NCTS Phase 5, in accordance with Articles 127 and 130 of Regulation (EU) No 952/2013. * **Information Communication:** Customs offices of the five Member States shall communicate the results of controls to other customs authorities through the electronic system referred to in Article 36(1) and (2) of Regulation (EU) 2015/2447. * **Reporting Requirement:** Bulgaria, Croatia, Latvia, Poland, Romania and Slovakia shall report monthly to the European Commission on progress in developing the interconnection under Commission Implementing Decision (EU) 2023/2879. * **Application Timeline:** The decision applies: * From 1 September 2025 until 31 May 2026 for road and rail consignments. * From 1 September 2025 until 31 December 2025 for postal consignments. **Impact Analysis** **Bulgaria, Croatia, Latvia, Poland, Romania, and Slovakia:** * **Impact:** Allowed to use alternative means for customs data exchange due to delays in system interconnection. Must still ensure security and safety data are lodged using ICS1 or ICS1 in combination with NCTS Phase 5, and communicate control results electronically. * **Action Required:** Implement alternative data exchange methods, ensure compliance with data lodging requirements, communicate control results, and report monthly to the Commission on progress in developing interconnection. **Economic Operators in/bordering Bulgaria, Croatia, Latvia, Poland, Romania, and Slovakia:** * **Impact:** May be able to use non-electronic methods for data exchange, at least temporarily. * **Action Required:** Adapt to using alternative data exchange methods as permitted by the derogation and stay informed about system updates and compliance requirements. **European Commission:** * **Impact:** Responsible for monitoring progress and ensuring Member States implement the derogation correctly. * **Action Required:** Receive and assess monthly progress reports from the specified Member States.

Key Entities Referenced

Regulation (EU) No 952/2013: Lays down the Union Customs Code. New Computerised Transit System (NCTS): Electronic system for transit of goods under the Union Customs Code. Commission Implementing Decision (EU) 2023/2879: Establishes the work programme relating to the development and deployment of the electronic systems provided for in the Union Customs Code. Import Control System 2 (ICS2): EU system for pre-arrival security and safety risk management. Bulgaria, Croatia, Latvia, Poland, Romania and Slovakia: Member States granted a derogation to use non-electronic means for data processing related to transit of goods.
Official Source Record View Original Source →
See Full Document Text
Official Journal EN of the European Union L series 2025/2591 19.12.2025 COMMISSION IMPLEMENTING DECISION(EU) 2025/2591 of 18 December 2025 granting a derogation to certain Member States pursuant to Regulation (EU) No 952/2013 of the European Parliament and of the Council to use means other than electronic data-processing techniques for the exchange and storage of information instead of component 2, phase 6, of the New Computerised Transit System (notified under document C(2025) 8776) (Only the Bulgarian, Croatian, Latvian, Polish, Romanian and Slovakian texts are authentic) THE EUROPEAN COMMISSION, Having regard to the Treaty on the Functioning of the European Union, Having regard to Regulation (EU) No 952/2013 of the European Parliament and of the Council of 9 October 2013 laying down the Union Customs Code(1), and in particular Article 6(4) in conjunction with Article 8(2) thereof, After consulting the Customs Code Committee, Whereas: (1) Under Article 6(1) of Regulation (EU) No 952/2013, all exchanges of information between customs authorities and between economic operators and customs authorities, and the storage of such information, as required under the customs legislation, is to be made using electronic data-processing techniques. (2) Commission Implementing Decision (EU) 2023/2879(2) establishes the work programme relating to the development and deployment of the electronic systems provided for in the Union Customs Code (‘the work programme’). The work programme lists the electronic systems to be developed and the dates on which those systems are expected to become operational. Amongst others, that programme specifies the implementation and deployment window for component 2, Phase 6 of the Union Customs Code New Computerised Transit System (‘NCTSP6’) upgrade in accordance with Articles 6(1), Article 16 and Articles 226 to 236 of Regulation (EU) No 952/2013. (3) Article 128 of Regulation (EU) No 952/2013 requires the Member State of first entry of the goods in the customs territory of the Union to ensure that a risk analysis is carried out, primarily for security and safety purposes, on the basis of the entry summary declaration (‘ENS’) and to take the necessary measures based on the results of that risk analysis. (4) Article 130 of that Regulation allows the Member State of first entry to replace the ENS by a customs declaration for goods for which that declaration was lodged prior to the expiry of the time-limit for lodging the ENS, provided that the customs declaration contains at least the particulars necessary for the entry summary declaration. Member States of first entry are therefore entitled to decide whether they wish to waive the obligation to lodge an ENS where a transit declaration has been lodged. Those Member States must nevertheless ensure that a proper risk analysis is carried out based on that transit declaration. (5) In accordance with Article 130 of that Regulation, several Member States, including those to whom this implementing decision is addressed, have ‘opted-in’ to the possibility to allow economic operators to submit transit declarations combined with the ENS, and to allow the consequent sharing of the ENS data from NCTSP6 with the Import Control System 2 (‘ICS2’) for the appropriate risk analysis and control processes. (1) OJ L 269, 10.10.2013, p. 1, ELI: http://data.europa.eu/eli/reg/2013/952/oj. (2) Commission Implementing Decision (EU) 2023/2879 of 15 December 2023 establishing the Work Programme relating to the development and deployment for the electronic systems provided for in the Union Customs Code (OJ L, 2023/2879, 22.12.2023, ELI: http://data.europa.eu/eli/dec_impl/2023/2879/oj). ELI: http://data.europa.eu/eli/dec_impl/2025/2591/oj 1/4EN OJ L, 19.12.2025 (6) In that respect, Article 278(3), point (e), of Regulation (EU) No 952/2013 specifies the deadline until which means other than electronic data-processing techniques may be used on a transitional basis to implement the provisions concerning transit of goods on the customs territory of the Union. (7) In accordance with Implementing Decision (EU) 2023/2879, the possibility to provide transit declarations combined with the ENS was to be ready by 1 September 2025, as part of the deployment of NCTSP6, which covers the development of the interface with ICS2, to facilitate the lodging of a transit declaration containing particulars of the entry summary declaration by applying Article 130(1) UCC. The deployment of NTSP6 is aligned with that of ICS2 Release 3 for road and rail, which ended on 1 September 2025. The use of this combined dataset submission is a trade facilitation tool already used under Regulation (EC) No 450/2008(3), as supplanted by Regulation (EU) No 952/2013, and which is still widely used, and traders have legitimately expected the Member States which ‘opted-in’ to the possibility to allow the submission of transit declarations combined with the ENS to be ready in time for the use of that combined dataset submission. (8) However, several specific circumstances and their ongoing effects have become apparent in the European Union. The ongoing war in Ukraine and the need to ensure uninterrupted functioning of the Ukrainian Solidarity lanes, the need to integrate ICS2 with the smart border systems and the considerable number of economic operators which are not ready in the bordering third countries have forced the Member State to extend the connection windows, even if on the side of their customs administration the system components are ready. Furthermore, the high number of operators that have difficulties obtaining a registration for connection to the IT systems, combined with the unique complexity and significance of the NCTSP6 requirements, as well as the ICS2 system, in addition to the resources necessary both for Member States to develop the interconnection between the two, and for economic operators to connect to it, have proven more challenging than originally envisaged. The specific and complex nature of the transportation mechanisms affected by this rollout, which include multi-modal forms, have also been proven to affect Bulgaria, Croatia, Latvia, Poland, Romania and Slovakia and economic operators more than others. Those Member States are ones where security and safety, relating to transportation of goods in road and rail traffic, are of a paramount concern. Bulgaria, Croatia, Latvia, Poland, Romania and Slovakia accordingly necessitate a robust solution to ensure legal certainty, business continuity and a smooth transition to the requirements of the ICS2 Release 3, step 3 rollout and its interconnection with NCTS Phase 6. (9) While all the Member States have successfully deployed ICS2 on time, these specific circumstances have prevented certain Member States from effectively developing the interconnection between NCTSP6 and ICS2 Release 3 or from onboarding their economic operators or those of the bordering third countries by the deadline of 1 September 2025. Therefore, in August 2025, Bulgaria, Croatia, Latvia, Poland, Romania and Slovakia formally requested to use means for the exchange and storage of information other than electronic data-processing techniques in accordance with Article 6(4), second subparagraph, of Regulation (EU) No 952/2013. (10) Bulgaria, Croatia, Latvia, Poland, Romania and Slovakia should therefore be granted a derogation, under Article 6(4) of Regulation (EU) No 952/2013, as regards the use of means for the exchange and storage of information other than electronic data-processing techniques instead of the NCTSP6, to the obligation of using electronic data- processing techniques for all exchanges of information between customs authorities and between economic operators and customs authorities, and the storage of such information, laid down by Article 6(1) of that Regulation. (11) Due to the significance of the NCTSP6 and ICS2 in establishing an integrated EU approach to reinforcing customs risk management and in ensuring pre-arrival security and safety, as well as security and safety in transit, whilst also facilitating the free flow of legitimate trade, as well as due to the nature and complexity of both the NCTS and ICS2 systems, the duration of the derogation should be kept to a strict minimum. In that light and having regard to the impacts of the specific circumstances that have caused delays in the ongoing interconnection of NCTSP6 and ICS2 Release 3 in the Member States that have ‘opted-in’ to this possibility, as well as the current state of those developments, the derogation should not continue longer than, and therefore expire on, 31 May 2026 for road and rail operators. (3) Regulation (EC) No 450/2008 of the European Parliament and of the Council of 23 April 2008 laying down the Community Customs Code (Modernised Customs Code) (OJ L 145, 4.6.2008, p. 1, ELI: http://data.europa.eu/eli/reg/2008/450/oj). 2/4 ELI: http://data.europa.eu/eli/dec_impl/2025/2591/ojEN OJ L, 19.12.2025 (12) Nonetheless, as regards goods in postal consignments this derogation should apply until no later than 31 December 2025, considering that the entry summary declaration for goods in postal consignments is subject to specific data requirements in accordance with Article 127(6) UCC and Article 113a of Commission Delegated Regulation (EU) 2015/2446(4). (13) In order to ensure the monitoring and the evaluation of the progress in implementing NCTSP6, Bulgaria, Croatia, Latvia, Poland, Romania and Slovakia should notify the Commission about the progress made in developing the interconnection between NCTSP6 and ICS2 and/or the ability of economic operators to submit their transit declarations jointly with the new entry summary declaration requirements under ICS2 Release 3 in relation to goods transported by road and rail as part of the progress reporting process laid down in Article 278a of Regulation (EU) No 952/2013. The communication and sharing of national planning information as outlined in Article 4 of Implementing Decision (EU) 2023/2879 is also to be ensured. Additional reporting requirements are also necessary, to ensure the European Commission can monitor and evaluate Member States’ progress, considering that national risk analysis systems cannot provide the same level of risk analysis as ICS2 European-wide system. (14) Given that, under Implementing Decision (EU) 2023/2879, NCTSP6 should be deployed by 1 September 2025, and ICS2 Release 3 for goods in road and rail consignments should be deployed by 1 September as well, and to prevent a legal void, this Decision should also apply from that date, HAS ADOPTED THIS DECISION: Article 1 This Decision applies to the goods in the following consignments: (a) road and rail consignments; (b) postal consignments. Article 2 1. Bulgaria, Croatia, Latvia, Poland, Romania and Slovakia may use means for the exchange and storage of information other than electronic data-processing techniques instead of component 2, Phase 6 of the Union Customs Code New Computerised Transit System (‘NCTS’) as referred to in Article 273 of Regulation (EU) 2015/2447 and the common component of release 3 of the UCC Import Control System 2 (‘ICS2’) referred to in Article 182 of that Regulation until 31 May 2026, or 31 December 2025, in accordance with Article 4 of this decision. 2. For the purposes of paragraph 1, Bulgaria, Croatia, Latvia, Poland, Romania and Slovakia shall ensure that economic operators may lodge the safety and security data, in accordance with Article 127(5) of (EU) No 952/2013, for goods entering the customs territory of the Union through those Member States, using either the Import Control System 1 (‘ICS1’) or, where applicable and depending on the arrangements in place in the Member State, ICS1 in combination with the transit declaration in NCTS Phase 5, in accordance with Articles 127 and 130 of Regulation (EU) No 952/2013. 3. The customs offices of Bulgaria, Croatia, Latvia, Poland, Romania and Slovakia shall communicate, in accordance with Article 186(7a) of Regulation (EU) 2015/2447, the results of the control they carried out to other customs authorities of the Member States through the electronic system referred to in Article 36(1) and (2) of Regulation (EU) 2015/2447. (4) Commission Delegated Regulation (EU) 2015/2446 of 28 July 2015 supplementing Regulation (EU) No 952/2013 of the European Parliament and of the Council as regards detailed rules concerning certain provisions of the Union Customs Code, (OJ L 343 29.12.2015, p. 1, ELI: http://data.europa.eu/eli/reg_del/2015/2446/oj). ELI: http://data.europa.eu/eli/dec_impl/2025/2591/oj 3/4EN OJ L, 19.12.2025 Article 3 Croatia, Latvia, Poland, Romania and Slovakia shall report monthly to the European Commission on progress made in developing the interconnection provided for in Commission Implementing Decision (EU) 2023/2879. Article 4 This decision shall apply from 1 September 2025 until 31 May 2026 for the consignments referred to in Article 1(a). However, as regards the consignments referred to in Article 1(b), it shall apply from 1 September 2025 until 31 December 2025. Article 5 This Decision is addressed to the Republic of Bulgaria, the Republic of Croatia, the Republic of Latvia, the Republic of Poland, Romania and the Slovak Republic. Done at Brussels, 18 December 2025. For the Commission Maroš ŠEFČOVIČ Member of the Commission 4/4 ELI: http://data.europa.eu/eli/dec_impl/2025/2591/oj

Continue your research