Date: 2023-11-28Category: Not ApplicableState: Union GovernmentCountry: Europe
Council Decision (CFSP) 2023/2680 of 27 November 2023 on an assistance measure under the European Peace Facility to support the Somali National Army with military equipment designed to deliver lethal force
Executive Summary:
Council Decision CFSP 2023/2680 establishes an assistance measure under the European Peace Facility (EPF) to support the Somali National Army (SNA) with military equipment. The objective is to build the SNA's capacity to restore safety and security and protect civilians, with a focus on training at the General Dhagabadan Training Centre. The duration of the assistance measure is 48 months from the date of adoption, November 27, 2023. The financial reference amount is EUR 1,000,000.
Key Points / Main Content:
* **Establishment and Objectives:**
* An assistance measure for Somalia is established under the European Peace Facility (EPF).
* The objective is to support the capacity building of the Somali National Army (SNA) through training.
* The aim is to restore safety and security in Somalia and protect the civilian population.
* The assistance measure will finance the provision of ammunition solely for training SNA personnel.
* **Financial Arrangements:**
* The financial reference amount for the assistance measure is EUR 1,000,000.
* All expenditure will be managed according to Decision CFSP 2021/509 and the rules for implementing revenue and expenditure financed under the EPF.
* **Arrangements with the Beneficiary (Somalia):**
* The High Representative must make arrangements with Somalia to ensure compliance with the Decision's requirements.
* Somalia must ensure SNA units comply with international law, especially human rights and humanitarian law.
* Assets provided must be used efficiently for their intended purposes and properly maintained.
* Assets cannot be lost or transferred without the Facility Committee's consent.
* Support can be suspended or terminated if Somalia breaches these obligations.
* **Implementation:**
* The High Representative is responsible for implementing the Decision.
* Implementation will be carried out in accordance with Decision CFSP 2021/509 and the EPF rules.
* Dfense Conseil International (DCI) Group will carry out activities referred to in Article 1(3).
* **Monitoring, Control, and Evaluation:**
* The High Representative will monitor Somalia's compliance with its obligations.
* Monitoring aims to prevent breaches of obligations, including violations of international law.
* Post-shipment control includes delivery verification, annual reporting by Somalia, and on-site visits by the High Representative and EPF auditors.
* A final evaluation will be conducted to assess whether the assistance measure achieved its objectives.
* **Reporting:**
* The High Representative will provide the Political and Security Committee (PSC) with six-monthly reports on the implementation.
* The administrator for assistance measures will inform the Facility Committee regularly on the implementation of revenue and expenditure, including information on suppliers and subcontractors.
* **Suspension and Termination:**
* The PSC may suspend the assistance measure.
* The PSC may recommend that the Council terminate the assistance measure.
Impact Analysis:
High Representative of the Union for Foreign Affairs and Security Policy:
* Impact: Responsible for making arrangements with Somalia, ensuring implementation of the Decision, monitoring compliance, and providing reports.
* Action Required: Make necessary arrangements with Somalia, oversee the implementation process, monitor compliance, and provide regular reports to the PSC.
Somali National Army (SNA):
* Impact: To receive support and training to build capacity, restore safety and security, and protect civilians. Must comply with international law and ensure proper use and maintenance of provided assets.
* Action Required: Comply with international law, use assets efficiently, maintain assets, and report on activities conducted with the equipment.
Political and Security Committee (PSC):
* Impact: Receives reports on the implementation of the assistance measure and can decide to suspend or recommend termination of the measure.
* Action Required: Review reports, monitor the implementation, and make decisions regarding suspension or termination.
Facility Committee:
* Impact: Informed regularly on the implementation of revenue and expenditure. Must consent to any transfer of assets at the end of their life cycle.
* Action Required: Monitor the implementation of revenue and expenditure and provide consent for asset transfers.
Dfense Conseil International (DCI) Group:
* Impact: Responsible for implementation of activities referred to in Article 1(3)
* Action Required: Implement the activities as directed by the High Representative.
Key Entities Referenced
European Peace Facility (EPF): A financing mechanism established by the European Union for Union actions under the Common Foreign and Security Policy (CFSP) to preserve peace, prevent conflicts, and strengthen international security.
Somali National Army (SNA): The national armed forces of Somalia, which is the beneficiary of the assistance measure under the European Peace Facility to support capacity building.
Council Decision CFSP 2021/509: A Council Decision establishing the European Peace Facility.
General Dhagabadan Training Centre: A training facility in Somalia where the Somali National Army (SNA) personnel are to be trained.
Somalia: The beneficiary country receiving assistance under the European Peace Facility to support its national army.
High Representative of the Union for Foreign Affairs and Security Policy: The official responsible for making arrangements with Somalia and ensuring the implementation of the decision in accordance with Decision CFSP 2021/509.
Political and Security Committee (PSC): A committee that receives six-monthly reports on the implementation of the assistance measure and can decide to suspend wholly or partially the implementation of the assistance measure.
Brussels: The city where the Council Decision CFSP 2023/2680 was adopted.
Official Journal EN
of the European Union L series
2023/2680 28.11.2023
COUNCIL DECISION (CFSP) 2023/2680
of 27 November 2023
on an assistance measure under the European Peace Facility to support the Somali National Army
with military equipment designed to deliver lethal force
THE COUNCIL OF THE EUROPEAN UNION,
Having regard to the Treaty on European Union, and in particular Articles 28(1) and 41(2) thereof,
Having regard to the proposal from the High Representative of the Union for Foreign Affairs and Security Policy,
Whereas:
(1) Council Decision (CFSP) 2021/509(1) establishes the European Peace Facility (EPF) for the financing by Member
States of Union actions under the Common Foreign and Security Policy (CFSP) to preserve peace, prevent conflicts
and strengthen international security pursuant to Article 21(2), point (c), of the Treaty. In particular, pursuant to
Article 1(2) of Decision (CFSP) 2021/509, the EPF is to be used for the financing of assistance measures such as
actions to strengthen the capacities of third States and regional and international organisations relating to military
and defence matters.
(2) Somalia has been plagued by armed conflict and recurrent humanitarian disasters, which have displaced millions
and killed hundreds of thousands. Continued instability has resulted in a long-lasting humanitarian crisis and left
the region at risk of becoming a stronghold for terrorism and transnational criminal networks.
(3) Ensuring Somalia’s overall stability, sovereignty and territorial integrity, as well as peaceful development, and respect
for human rights, in line with the Council Conclusions of 22 January 2018on the Integrated Approach to External
Conflicts and Crises, is a key priority for the Union.
(4) On 29 October 2023, the High Representative of the Union for Foreign Affairs and Security Policy (the ‘High
Representative’) received a request from Somalia for the Union to assist the Somali National Army with the
procurement under the EPF of military equipment designed to deliver lethal force.
(5) Assistance measures are to be implemented taking into account the principles and requirements set out in Decision
(CFSP) 2021/509, in particular compliance with Council Common Position 2008/944/CFSP(2), and in accordance
with the rules for the implementation of revenue and expenditure financed under the EPF.
(6) The Council reaffirms its determination to protect, promote and fulfil human rights, fundamental freedoms and
democratic principles and to strengthen the rule of law and good governance, in compliance with the United
Nations Charter, with the Universal Declaration of Human Rights and with international law, in particular
international human rights law and international humanitarian law,
(1) Council Decision (CFSP) 2021/509 of 22 March 2021 establishing a European Peace Facility, and repealing Decision (CFSP) 2015/528
(OJ L 102, 24.3.2021, p. 14).
(2) Council Common Position 2008/944/CFSP of 8 December 2008 defining common rules governing control of exports of military
technology and equipment (OJ L 335, 13.12.2008, p. 99).
ELI: http://data.europa.eu/eli/dec/2023/2680/oj 1/4EN
OJ L, 28.11.2023
HAS ADOPTED THIS DECISION:
Article 1
Establishment, objectives, scope and duration
1. An assistance measure benefiting Somalia (the ‘beneficiary’) to be financed under the European Peace Facility (EPF)
(the ‘assistance measure’) is hereby established.
2. The objective of the assistance measure is to support the capacity building of the Somali National Army (SNA) to be
trained at the General Dhagabadan Training Centre, with a view to restoring safety and security in the country, and to
protecting the civilian population.
3. To achieve the objective set out in paragraph 2, the assistance measure shall finance the provision of ammunition
solely for training SNA personnel.
4. The duration of the assistance measure shall be 48 months from the date of adoption of this Decision.
Article 2
Financial arrangements
1. The financial reference amount intended to cover the expenditure related to the assistance measure shall be
EUR 1 000 000.
2. All expenditure shall be managed in accordance with Decision (CFSP) 2021/509 and the rules for the implementation
of revenue and expenditure financed under the EPF.
Article 3
Arrangements with the beneficiary
1. The High Representative shall make the necessary arrangements with the beneficiary to ensure its compliance with
the requirements and conditions established by this Decision as a condition for the provision of support under the
assistance measure.
2. The arrangements referred to in paragraph 1 shall include provisions obliging the beneficiary to ensure:
(a) the compliance of the SNA units supported under the assistance measure with relevant international law, in particular
international human rights law and international humanitarian law;
(b) the proper and efficient use of any assets provided under the assistance measure for the purposes for which they were
provided;
(c) the sufficient maintenance of any assets provided under the assistance measure to ensure their usability and their
operational availability over their life cycle;
(d) that any assets provided under the assistance measure will not be lost, or be transferred without the consent of the
Facility Committee established under Decision (CFSP) 2021/509 to persons or entities other than those identified in
those arrangements, at the end of their life cycle.
3. The arrangements referred to in paragraph 1 shall include provisions on the suspension and termination of support
under the assistance measure in the event of the beneficiary being found in breach of the obligations set out in paragraph 2.
2/4 ELI: http://data.europa.eu/eli/dec/2023/2680/ojEN
OJ L, 28.11.2023
Article 4
Implementation
1. The High Representative shall be responsible for ensuring the implementation of this Decision in accordance with
Decision (CFSP) 2021/509, and the rules for the implementation of revenue and expenditure financed under the EPF, in
line with the Integrated Methodological Framework for assessing and identifying the required measures and controls for
assistance measures under the EPF.
2. The implementation of the activities referred to in Article 1(3) shall be carried out by Défense Conseil International –
DCI Group.
Article 5
Monitoring, control and evaluation
1. The High Representative shall monitor the compliance by the beneficiary with the obligations set out in Article 3.
That monitoring shall be used to provide awareness of the context and the risks of breaches of the obligations established
in accordance with Article 3, and to contribute to the prevention of such breaches, including violations of international
human rights law and international humanitarian law by the SNA units supported under the assistance measure.
2. The post-shipment control of equipment and supplies shall be organised as follows:
(a) delivery verification, whereby EPF delivery certificates are to be signed by the end-user forces upon transfer of
ownership;
(b) reporting, whereby the beneficiary is to report annually on the activities conducted with the equipment provided under
the assistance measure and on the inventory of designated items until such reporting is no longer deemed necessary by
the Political and Security Committee (PSC);
(c) on-site visits, whereby the beneficiary is to grant the High Representative and EPF auditors access to conduct on-site
controls and EPF audits, upon request.
3. The High Representative shall conduct a final evaluation upon completion of the assistance measure to assess
whether the assistance measure has contributed to reaching the objectives stated in Article 1(2).
Article 6
Reporting
During the period of implementation, the High Representative shall provide the PSC with six-monthly reports on the
implementation of the assistance measure, in accordance with Article 63 of Decision (CFSP) 2021/509. The administrator
for assistance measures shall regularly inform the Facility Committee established by Decision (CFSP) 2021/509 on the
implementation of revenue and expenditure in accordance with Article 38 of that Decision, including by providing
information on the suppliers and subcontractors involved.
Article 7
Suspension and termination
1. The PSC may decide to suspend wholly or partially the implementation of the assistance measure in accordance with
Article 64 of Decision (CFSP) 2021/509.
2. The PSC may also recommend that the Council terminate the assistance measure.
ELI: http://data.europa.eu/eli/dec/2023/2680/oj 3/4EN
OJ L, 28.11.2023
Article 8
Entry into force
This Decision shall enter into force on the date of its adoption.
Done at Brussels, 27 November 2023.
For the Council
The President
Y. DÍAZ PÉREZ
4/4 ELI: http://data.europa.eu/eli/dec/2023/2680/oj