Date: 2026-01-30Category: Not ApplicableState: Union GovernmentCountry: Europe
Council Decision (CFSP) 2026/232 of 29 January 2026 on an assistance measure under the European Peace Facility to support the Armed Forces of the Republic of Armenia
**Executive Summary**
Council Decision (CFSP) 2026/232, adopted on January 29, 2026, establishes an assistance measure under the European Peace Facility (EPF) to support the Armed Forces of the Republic of Armenia. The measure aims to strengthen military capacities and promote cooperation in security and defense. The duration of the assistance measure is 35 months from the date of adoption.
**Key Points / Main Content**
* **Establishment and Objectives:**
* Establishes an assistance measure for the Republic of Armenia under the EPF.
* Aims to strengthen military and defense capacities, enhance national security, stability, and resilience, and protect civilians.
* Supports cooperation in security and defense to strengthen the beneficiary's capacities to participate in Union military missions and operations.
* **Scope:**
* Finances logistics and medical equipment (non-lethal) to scale up the existing battalion-size tent camp and medical facility to brigade level by adding two battalion-size camp elements.
* Finances related supplies, services, and technical training.
* **Financial Arrangements:**
* Sets a financial reference amount of EUR 20,000,000 for the assistance measure.
* All expenditure is managed according to Decision (CFSP) 2021/509 and EPF rules.
* **Arrangements with the Beneficiary:**
* Requires the High Representative to make arrangements with Armenia to ensure compliance with the Decision's requirements.
* Armenia must ensure compliance with international law, proper use of assets, and maintenance of assets provided.
* The assistance may be suspended or terminated if Armenia breaches its obligations.
* **Implementation, Monitoring, and Reporting:**
* The High Representative is responsible for implementation, following Decision (CFSP) 2021/509.
* The High Representative will monitor compliance with obligations.
* Post-shipment controls include delivery verification, inventory reporting, and on-site visits.
* The High Representative will conduct a final evaluation.
* The High Representative shall provide the PSC with six-monthly reports on implementation.
* **Suspension and Termination**
* The PSC may decide to suspend wholly or partially the implementation of the assistance measure.
* The PSC may recommend that the Council terminate the assistance measure.
**Impact Analysis**
**Stakeholder: Republic of Armenia (Armed Forces)**
* **Impact**: Receives support to strengthen logistics and medical capacities. Expected to enhance national security and stability.
* **Action Required**: Comply with international law, ensure proper and efficient use of assets, and maintain provided equipment.
**Stakeholder: High Representative of the Union for Foreign Affairs and Security Policy**
* **Impact**: Responsible for making arrangements with the beneficiary and is responsible for the correct implementation of the Decision. Has to monitor the compliance by the beneficiary and the final evaluation.
* **Action Required**: Make necessary arrangements with Armenia, monitor compliance, report on implementation, and conduct a final evaluation.
**Stakeholder: Political and Security Committee (PSC)**
* **Impact**: Receives reports on the implementation of the assistance measure.
* **Action Required**: Review six-monthly reports and decide on suspension or termination if needed.
Key Entities Referenced
European Peace Facility (EPF): A financing mechanism for EU actions under the common foreign and security policy to preserve peace, prevent conflicts, and strengthen international security.
Republic of Armenia: Recipient of assistance to support the Armed Forces of the Republic of Armenia.
Council Decision (CFSP) 2021/509: Establishes the European Peace Facility and sets out the rules for its operation, including financing and implementation.
High Representative of the Union for Foreign Affairs and Security Policy: Responsible for proposing the assistance measure and making arrangements with the beneficiary.
Comprehensive and Enhanced Partnership Agreement: Agreement between the EU and Armenia to enhance political and economic partnership and cooperation.
Official Journal EN
of the European Union L series
2026/232 30.1.2026
COUNCIL DECISION (CFSP) 2026/232
of 29 January 2026
on an assistance measure under the European Peace Facility to support the Armed Forces of the
Republic of Armenia
THE COUNCIL OF THE EUROPEAN UNION,
Having regard to the Treaty on European Union, and in particular Article 28(1) and Article 41(2) thereof,
Having regard to the proposal from the High Representative of the Union for Foreign Affairs and Security Policy,
Whereas:
(1) Council Decision (CFSP) 2021/509(1) establishes the European Peace Facility (EPF) for the financing by Member
States of Union actions under the common foreign and security policy to preserve peace, prevent conflicts and
strengthen international security pursuant to Article 21(2), point (c), of the Treaty. In particular, pursuant to
Article 1(2) of Decision (CFSP) 2021/509, the EPF is to be used for the financing of assistance measures such as
actions to strengthen the capacities of third States and regional and international organisations relating to military
and defence matters.
(2) The Union is committed to enhancing the comprehensive political and economic partnership and cooperation with
the Republic of Armenia, based on the Comprehensive and Enhanced Partnership Agreement between the Union
and the European Atomic Energy Community and their Member States, of the one part, and the Republic of
Armenia, of the other part(2)(the ‘Enhanced Partnership Agreement’), and to promoting the development of close
political relations. Pursuant to Article 5 of the Enhanced Partnership Agreement, the Union and the Republic of
Armenia are to intensify their dialogue and cooperation in the area of foreign and security policy, including the
common security and defence policy (CSDP), and are to address in particular issues of conflict prevention and crisis
management, risk reduction, cybersecurity, security-sector reform, regional stability, disarmament, non-proliferation,
arms control and export control.
(3) The Union recognises the Republic of Armenia’s intent to contribute to the Union’s CSDP missions and operations
in the future, and welcomes the outcome of the negotiations for an agreement establishing a framework for the
participation of the Republic of Armenia in Union crisis management operations.
(4) This Decision builds upon Council Decision (CFSP) 2024/2010(3) with regard to the Union’s continued
commitment to support the strengthening of capacities of the Armed Forces of the Republic of Armenia in
priority-need areas.
(5) On 4 December 2024, the High Representative of the Union for Foreign Affairs and Security Policy received
a request from the Republic of Armenia for the Union to assist the Armed Forces of the Republic of Armenia with
the procurement of key equipment to strengthen logistics and medical capacities.
(6) Assistance measures are to be implemented taking into account the principles and requirements set out in Decision
(CFSP) 2021/509, in particular compliance with Council Common Position 2008/944/CFSP(4), and in line with the
rules for the implementation of revenue and expenditure financed under the EPF.
(1) Council Decision (CFSP) 2021/509 of 22 March 2021 establishing a European Peace Facility, and repealing Decision (CFSP)
2015/528 (OJ L 102, 24.3.2021, p. 14, ELI: http://data.europa.eu/eli/dec/2021/509/oj).
(2) Council Decision (EU) 2018/104 of 20 November 2017 on the signing, on behalf of the Union, and provisional application of the
Comprehensive and Enhanced Partnership Agreement between the European Union and the European Atomic Energy Community
and their Member States, of the one part, and the Republic of Armenia, of the other part (OJ L 23, 26.1.2018, p. 1, ELI: http://data.
europa.eu/eli/dec/2018/104/oj).
(3) Council Decision (CFSP) 2024/2010 of 22 July 2024 on an assistance measure under the European Peace Facility to support the
Armed Forces of the Republic of Armenia (OJ L, 2024/2010, 23.7.2024, ELI: http://data.europa.eu/eli/dec/2024/2010/oj).
(4) Council Common Position 2008/944/CFSP of 8 December 2008 defining common rules governing control of exports of military
technology and equipment (OJ L 335, 13.12.2008, p. 99, ELI: http://data.europa.eu/eli/compos/2008/944/oj).
ELI: http://data.europa.eu/eli/dec/2026/232/oj 1/4EN
OJ L, 30.1.2026
(7) The Council reaffirms its determination to protect, promote and fulfil human rights, fundamental freedoms and
democratic principles and to strengthen the rule of law and good governance, in compliance with the Charter of the
United Nations, with the Universal Declaration of Human Rights and with international law, in particular
international human rights law and international humanitarian law,
HAS ADOPTED THIS DECISION:
Article 1
Establishment, objectives, scope and duration
1. An assistance measure benefiting the Republic of Armenia (the ‘beneficiary’) to be financed under the European Peace
Facility (EPF) (the ‘assistance measure’) is hereby established.
2. The objectives of the assistance measure are the following:
(a) to contribute to strengthening the military and defence capacities of the Armed Forces of the Republic of Armenia in
order to enhance national security, stability and resilience, and thereby also better protect civilians in crises and
emergencies;
(b) to support cooperation in the area of security and defence between the Union and the beneficiary, with a view to
strengthening the beneficiary’s capacities to participate in Union military common security and defence policy missions
and operations, accelerating compliance with Union standards and interoperability, and promoting alignment with the
Union’s common foreign and security policy.
3. To achieve the objectives set out in paragraph 2, the assistance measure shall finance logistics and medical equipment
not designed to deliver lethal force in order to scale up the battalion-size tent camp and role-1 medical treatment facility
adopted under Decision (CFSP) 2024/2010 to brigade level, by adding two additional battalion-size camp elements and
related camp services.
The assistance measure shall also finance related supplies and services, including technical training, where needed.
4. The duration of the assistance measure shall be 35 months from the date of adoption of this Decision.
Article 2
Financial arrangements
1. The financial reference amount intended to cover the expenditure related to the assistance measure shall be
EUR 20 000 000.
2. All expenditure shall be managed in accordance with Decision (CFSP) 2021/509 and in line with the rules for the
implementation of revenue and expenditure financed under the EPF.
Article 3
Arrangements with the beneficiary
1. The High Representative of the Union for Foreign Affairs and Security Policy (the ‘High Representative’) shall make the
necessary arrangements with the beneficiary to ensure its compliance with the requirements and conditions established by
this Decision as a condition for the provision of support under the assistance measure.
2. The arrangements referred to in paragraph 1 shall include provisions obliging the beneficiary to ensure:
(a) compliance of the units of the Armed Forces of the Republic of Armenia supported under the assistance measure with
relevant international law, in particular international human rights law and international humanitarian law;
(b) proper and efficient use of any assets provided under the assistance measure for the purposes for which they were
provided;
2/4 ELI: http://data.europa.eu/eli/dec/2026/232/ojEN
OJ L, 30.1.2026
(c) sufficient maintenance of any assets provided under the assistance measure to ensure their usability and operational
availability over their life cycle;
(d) that any assets provided under the assistance measure are not lost or transferred to persons or entities other than those
identified in those arrangements.
3. The arrangements referred to in paragraph 1 shall include provisions on the suspension and termination of support
under the assistance measure in the event of the beneficiary being found in breach of the obligations set out in paragraph 2.
Article 4
Implementation
1. The High Representative shall be responsible for ensuring the implementation of this Decision in accordance with
Decision (CFSP) 2021/509, and in line with the rules for the implementation of revenue and expenditure financed under
the EPF and with the Integrated Methodological Framework for assessing and identifying the required measures and controls
for assistance measures under the EPF.
2. The implementation of the activities referred to in Article 1(3) of this Decision shall be carried out by the
administrator for assistance measures, including through administrative arrangements in accordance with Article 37 of
Decision (CFSP) 2021/509.
Article 5
Monitoring, control and evaluation
1. The High Representative shall monitor the compliance by the beneficiary with the obligations set out in Article 3.
That monitoring shall be used to provide awareness of the context and the risks of breaches of the obligations set out in
Article 3, and to contribute to the prevention of such breaches, including violations of international human rights law and
international humanitarian law by the units of the Armed Forces of the Republic of Armenia supported under the
assistance measure.
2. The post-shipment control of equipment and supplies shall be organised as follows:
(a) delivery verification, whereby EPF delivery certificates are to be signed by the end-user forces upon transfer of
ownership;
(b) reporting on the inventory, whereby the beneficiary is to report annually on the inventory of designated items until such
reporting is no longer deemed necessary by the Political and Security Committee (PSC);
(c) on-site visits, whereby the beneficiary is to grant the High Representative and the EPF auditors access to conduct on-site
checks and EPF audits, upon request.
3. The High Representative shall conduct a final evaluation upon completion of the assistance measure to assess whether
the assistance measure has contributed to reaching the objectives set out in Article 1(2).
Article 6
Reporting
During the period of implementation, the High Representative shall provide the PSC with six-monthly reports on the
implementation of the assistance measure, in accordance with Article 63 of Decision (CFSP) 2021/509. The administrator
for assistance measures shall regularly inform the Facility Committee established by Decision (CFSP) 2021/509 on the
implementation of revenue and expenditure in accordance with Article 38 of that Decision, including by providing
information on the suppliers and subcontractors involved.
ELI: http://data.europa.eu/eli/dec/2026/232/oj 3/4EN
OJ L, 30.1.2026
Article 7
Suspension and termination
1. The PSC may decide to suspend wholly or partially the implementation of the assistance measure in accordance with
Article 64 of Decision (CFSP) 2021/509.
2. The PSC may recommend that the Council terminate the assistance measure.
Article 8
Entry into force
This Decision shall enter into force on the date of its adoption.
Done at Brussels, 29 January 2026.
For the Council
The President
K. KALLAS
4/4 ELI: http://data.europa.eu/eli/dec/2026/232/oj