Date: 2023-11-28Category: Not ApplicableState: Union GovernmentCountry: Europe
Council Decision (CSFP) 2023/2682 of 27 November 2023 on an assistance measure under the European Peace Facility to support military actors and navies of coastal states involved in maritime security operations in the Gulf of Guinea
Executive Summary:
Council Decision (CFSP) 2023/2682 establishes an assistance measure under the European Peace Facility (EPF) to support military actors and navies of coastal states involved in maritime security operations in the Gulf of Guinea (GoG). The objective is to strengthen antipiracy and maritime security by enhancing maritime situational awareness and increasing the capacity of selected coastal navies. The assistance measure is set to last for 48 months from the date of adoption, with a financial reference amount of EUR 21,000,000.
Key Points / Main Content:
Establishment and Objectives:
* An assistance measure benefiting the Yaound Architecture, Cameroon, and Ghana is established under the EPF.
* The objective is to strengthen antipiracy and maritime security operations in the GoG, reduce criminality, and protect maritime vessels, resources, and coastal populations.
Scope of Assistance:
* Financing for equipment and services not designed to deliver lethal force will be provided.
* This includes ISR services via a manned aerial asset for one year, with the National Maritime Operations Centre of the Cameroon navy responsible for processing and sharing the ISR information.
* Support for patrolling vessels includes intervention speedboats for Cameroon and naval unmanned air systems, engineering materiel, and scuba diving equipment for Ghana.
* Technical assistants will be provided to the navies of Cameroon and Ghana.
* A naval assistant will liaise with the Yaound Architecture structures.
Financial and Implementation Arrangements:
* The financial reference amount for the assistance measure is EUR 21,000,000.
* Expenditure will be managed according to Decision CFSP 2021/509 and EPF rules.
* The High Representative will make arrangements with beneficiaries to ensure compliance with the decision's requirements.
* Implementation of activities will be carried out by Fundacin Internacional y para Iberoamrica de Administracin y Polticas Pblicas (FIIAPP) Cooperacin Espaola.
Beneficiary Obligations:
* Beneficiaries must ensure compliance with international law, particularly human rights and humanitarian law.
* They must ensure the proper and efficient use and sufficient maintenance of provided assets.
* Assets cannot be lost or transferred without consent from the Facility Committee.
* Support may be suspended or terminated if beneficiaries breach these obligations.
Monitoring, Control, and Evaluation:
* The High Representative will monitor compliance by the beneficiaries with their obligations.
* Post-shipment control includes delivery verification, annual reporting on activities and inventory, and on-site visits.
* A final evaluation will be conducted to assess the assistance measure's contribution to the objective.
Reporting and Review:
* The High Representative will provide six-monthly reports on implementation to the Political and Security Committee (PSC).
* The administrator will regularly inform the Facility Committee on revenue and expenditure.
* The PSC may suspend implementation or recommend termination of the assistance measure.
Duration:
* The assistance measure will last for 48 months from the adoption of the Decision.
Impact Analysis:
European Union (High Representative and PSC):
* Impact: Responsible for the overall implementation, monitoring, and control of the assistance measure, including financial management and compliance oversight.
* Action Required: The High Representative must establish arrangements with beneficiaries, monitor compliance, and provide regular reports. The PSC must review reports and may decide on suspension or termination.
Cameroon and Ghana (Beneficiary States):
* Impact: Will receive support to enhance their maritime security capabilities, including equipment, technical assistance, and ISR services.
* Action Required: Must comply with the conditions set by the High Representative, including proper use and maintenance of assets, adherence to international law, and participation in monitoring and reporting activities.
Yaound Architecture (Regional Organizations):
* Impact: The assistance measure aims to strengthen the Yaound Architecture's capacity to enhance maritime security in the Gulf of Guinea.
* Action Required: Coordinate with Cameroon and Ghana, as well as the EU, to effectively utilize the ISR information and other support provided.
Fundacin Internacional y para Iberoamrica de Administracin y Polticas Pblicas (FIIAPP) Cooperacin Espaola:
* Impact: Responsible for implementing the activities outlined in Article 1.
* Action Required: Carry out the activities as directed by the High Representative.
Key Entities Referenced
European Peace Facility (EPF): A financing mechanism by Member States of Union actions under the common foreign and security policy to preserve peace, prevent conflicts and strengthen international security.
Gulf of Guinea (GoG): A region where the assistance measure aims to strengthen antipiracy and maritime security operations.
Yaound Architecture: A regional framework for maritime security in the Gulf of Guinea, including organizations such as CRESMAC, CRESMAO, ICC, and MMCCs.
Cameroon: A coastal state in the Gulf of Guinea and a beneficiary of the assistance measure, specifically its navy.
Ghana: A coastal state in the Gulf of Guinea and a beneficiary of the assistance measure, specifically its navy.
Council Decision CFSP 2021/509: Establishes the European Peace Facility and provides the framework for financing the assistance measure.
Regional Center For Maritime Security in Central Africa (CRESMAC): A regional organization that is part of the Yaound Architecture.
Regional Center for Maritime Security in West Africa (CRESMAO): A regional organization that is part of the Yaound Architecture.
Official Journal EN
of the European Union L series
2023/2682 28.11.2023
COUNCIL DECISION (CSFP) 2023/2682
of 27 November 2023
on an assistance measure under the European Peace Facility to support military actors and navies of
coastal states involved in maritime security operations in the Gulf of Guinea
THE COUNCIL OF THE EUROPEAN UNION,
Having regard to the Treaty on European Union, and in particular Articles 28(1) and 41(2) thereof,
Having regard to the proposal from the High Representative of the Union for Foreign Affairs and Security Policy,
Whereas:
(1) Council Decision (CFSP) 2021/509(1) establishes the European Peace Facility (EPF) for the financing by Member
States of Union actions under the common foreign and security policy to preserve peace, prevent conflicts and
strengthen international security pursuant to Article 21(2), point (c), of the Treaty. In particular, pursuant to
Article 1(2) of Decision (CFSP) 2021/509, the EPF is to be used for the financing of assistance measures such as
actions to strengthen the capacities of third States and regional and international organisations relating to military
and defence matters.
(2) On the occasion of the tenth anniversary of the Yaoundé Code of Conduct, the Union and its Member States
reiterated their support for the Gulf of Guinea (GoG) region and renewed their commitment to enhancing maritime
security in the area.
(3) On 4 May 2022, the Council approved the concept of a possible assistance measure benefiting the GoG coastal
states, with the overarching objective of supporting African-led maritime security and anti-piracy activities
conducted by military actors in the GoG to ultimately reduce the incidence, duration and intensity of violence and
criminality, and to protect navy vessels and coastal populations, and their livelihoods.
(4) As part of that concept, the Council approved a preparatory measure that would serve as a basis for a future
proposal by the High Representative for Foreign Affairs and Security Policy (the ‘High Representative’) in respect of
an assistance measure to enhance maritime security in the GoG. The preparatory measure was conducted between
September and December 2022 with the twofold objective of, first, identifying and developing technical
specifications for an Intelligence, Surveillance and Reconnaissance (ISR) system and of providing objective and
transparent criteria to enable the choice for its location, and, second, of assessing the navies of the GoG coastal
states in order to identify among them the most technically and politically suitable to achieve the objectives of the
assistance measure. The results of the preparatory measure identified a manned aerial vehicle as the optimal
solution for an ISR system, while Cameroon, Ghana, Congo and Benin were identified as the most appropriate GoG
coastal states with sufficient marine, regulatory and political capacity to be able to participate in the assistance
measure.
(5) During January and June 2023, a series of scoping and outreach events, including missions on the ground, were
carried out in order to further streamline and refine the findings of the preparatory measure, as well as to ensure
full coordination and collaboration with the pre-identified GoG coastal states and with the regional organisations
that are part of the Yaoundé Architecture, notably the Regional Center For Maritime Security in Central Africa
(CRESMAC), the Regional Center for Maritime Security in West Africa (CRESMAO), the Interregional Coordination
Centre (ICC) and the Multinational Maritime Coordination Centres (MMCCs) of Douala, Accra and Pointe Noire. As
a result of that outreach and on the basis of expressed readiness by the pre-identified GoG coastal states, Cameroon
and Ghana were chosen as beneficiaries of the assistance measure.
(1) Council Decision (CFSP) 2021/509 of 22 March 2021 establishing a European Peace Facility, and repealing Decision (CFSP) 2015/528
(OJ L 102, 24.3.2021, p. 14).
ELI: http://data.europa.eu/eli/dec/2023/2682/oj 1/4EN
OJ L, 28.11.2023
(6) Given the complexity of the assistance measure and in order to limit any potential political or technical risk, the
assistance for the GoG coastal states on maritime security will follow a gradual approach. On the basis of the six-
monthly assessment of the assistance measure, a decision can be made to continue and expand the support to other
GoG coastal states, possibly in 2024.
(7) On 16 June 2023, the High Representative received a request from Ghana for the Union to assist the Navy of Ghana
with the procurement of key equipment to strengthen its operational capabilities as regards patrolling the high seas.
(8) On 19 September 2023, the High Representative received a request from Cameroon for the Union to assist the Navy
of Cameroon with the procurement of key equipment to strengthen its operational capabilities as regards patrolling
the high seas, as well as to assist the Yaoundé Architecture with the provision of ISR services via a manned aerial
asset, in order to enhance the operational capacities of the Yaoundé Architecture’s member states in their
surveillance of the GoG, with the ultimate aim of improving maritime security in the region.
(9) Assistance measures are to be implemented taking into account the principles and requirements set out in Decision
(CFSP) 2021/509, in particular compliance with Council Common Position 2008/944/CFSP(2), and in accordance
with the rules for the implementation of revenue and expenditure financed under the EPF.
(10) The Council reaffirms its determination to protect, promote and fulfil human rights, fundamental freedoms and
democratic principles and to strengthen the rule of law and good governance, in compliance with the United
Nations Charter, with the Universal Declaration of Human Rights and with international law, in particular
international human rights law and international humanitarian law,
HAS ADOPTED THIS DECISION:
Article 1
Establishment, objectives, scope and duration
1. An assistance measure benefiting the Yaoundé Architecture, Cameroon and Ghana (the ‘beneficiaries’) to be financed
under the European Peace Facility (EPF) (the ‘assistance measure’) is hereby established.
2. The objective of the assistance measure is to strengthen anti-piracy and maritime security operations and deterrence
activities in the Gulf of Guinea by strengthening the capacities of the Yaoundé Architecture and of its member states,
notably by enhancing their maritime situational awareness, and by increasing the capacity of selected coastal navies to
patrol the high seas, to ultimately reduce the incidence of criminality, and to protect maritime vessels and resources and
coastal populations, and their livelihoods.
3. To achieve the objective set out in paragraph 2, the assistance measure shall finance the following types of equipment
and services not designed to deliver lethal force:
(a) provision of ISR services via a manned aerial asset, for a period of one year; the National Maritime Operations Centre of
the Cameroon navy of Douala shall be responsible for receiving, further processing, and sharing the ISR information
with the other regional centres and maritime coordination centres of the Yaoundé Architecture via the Yaoundé
Architecture Regional Information System;
(b) support to patrolling vessels of:
(i) Cameroon, via the provision of intervention speedboats;
(ii) Ghana, via the provision of naval unmanned air systems for surveillance at sea, engineering materiel for boats
services and scuba diving equipment;
(c) a technical assistant to assist each of the navies of Cameroon and Ghana;
(2) Council Common Position 2008/944/CFSP of 8 December 2008 defining common rules governing control of exports of military
technology and equipment (OJ L 335, 13.12.2008, p. 99).
2/4 ELI: http://data.europa.eu/eli/dec/2023/2682/ojEN
OJ L, 28.11.2023
(d) one naval assistant to liaise with the structures of the Yaoundé Architecture, namely the ICC, CRESMAC, CRESMAO,
and the MMCCs of Douala, Cameroon and Accra, Ghana.
4. The duration of the assistance measure shall be 48 months from the adoption of this Decision.
Article 2
Financial arrangements
1. The financial reference amount intended to cover the expenditure related to the assistance measure shall be
EUR 21 000 000.
2. All expenditure shall be managed in accordance with Decision (CFSP) 2021/509 and the rules for the implementation
of revenue and expenditure financed under the EPF.
Article 3
Arrangements with the beneficiaries
1. The High Representative shall make the necessary arrangements with the beneficiaries to ensure their compliance
with the requirements and conditions established by this Decision as a condition for the provision of support under the
assistance measure.
2. The arrangements referred to in paragraph 1 shall include provisions obliging the beneficiary to ensure:
(a) the compliance of the units of the Armed Forces of Cameroon and Ghana supported under the assistance measure with
relevant international law, in particular international human rights law and international humanitarian law;
(b) the proper and efficient use of any assets provided under the assistance measure for the purposes for which they were
provided;
(c) the sufficient maintenance of any assets provided under the assistance measure to ensure their usability and their
operational availability over their life cycle;
(d) that any assets provided or maintained under the assistance measure will not be lost, or be transferred without the
consent of the Facility Committee established under Decision (CFSP) 2021/509 to persons or entities other than those
identified in those arrangements, at the end of their life cycle.
3. The arrangements referred to in paragraph 1 shall include provisions on the suspension and termination of support
under the assistance measure in the event of a beneficiary being found in breach of the obligations set out in paragraph 2.
Article 4
Implementation
1. The High Representative shall be responsible for ensuring the implementation of this Decision in accordance with
Decision (CFSP) 2021/509 and the rules for the implementation of revenue and expenditure financed under the EPF, in
line with the Integrated Methodological Framework for assessing and identifying the required measures and controls for
assistance measures under the EPF.
2. The implementation of the activities referred to in Article 1(3) shall be carried out by Fundación Internacional y para
Iberoamérica de Administración y Políticas Públicas (FIIAPP) – Cooperación Española.
ELI: http://data.europa.eu/eli/dec/2023/2682/oj 3/4EN
OJ L, 28.11.2023
Article 5
Monitoring, control and evaluation
1. The High Representative shall monitor the compliance by the beneficiaries with the obligations set out in Article 3.
This monitoring shall be used to provide awareness of the context and the risks of breaches of the obligations established
in accordance with Article 3, and to contribute to the prevention of such breaches, including violations of international
human rights law and international humanitarian law by the units supported under the assistance measure.
2. The post-shipment control of equipment and supplies shall be organised as follows:
(a) delivery verification, whereby EPF delivery certificates are to be signed by the end-user forces upon transfer of
ownership;
(b) reporting, whereby the beneficiary is to report annually on the activities conducted with the equipment, supplies and
services provided under the assistance measure and on the inventory of designated items until such reporting is no
longer deemed necessary by the Political and Security Committee (PSC);
(c) on-site visits, whereby the beneficiary is to grant the High Representative and EPF auditors access to conduct on-site
controls and EPF audits, upon request.
3. The High Representative shall conduct a final evaluation upon completion of the assistance measure to assess
whether the assistance measure has contributed to reaching the objective referred to in Article 1(2).
Article 6
Reporting
During the period of implementation, the High Representative shall provide the PSC with six-monthly reports on the
implementation of the assistance measure, in accordance with Article 63 of Decision (CFSP) 2021/509. The administrator
for assistance measures shall regularly inform the Facility Committee established by Decision (CFSP) 2021/509 on the
implementation of revenue and expenditure in accordance with Article 38 of that Decision, including by providing
information on the suppliers and subcontractors involved.
Article 7
Suspension and termination
1. The PSC may decide to suspend wholly or partially the implementation of the assistance measure in accordance with
Article 64 of Decision (CFSP) 2021/509.
2. The PSC may also recommend that the Council terminate the assistance measure.
Article 8
Entry into force
This Decision shall enter into force on the date of its adoption.
Done at Brussels, 27 November 2023.
For the Council
The President
Y. DÍAZ PÉREZ
4/4 ELI: http://data.europa.eu/eli/dec/2023/2682/oj