Decision No 2/2020 of the Joint Committee established by the Agreement between the European Union and the Swiss Confederation on the linking of their greenhouse gas emissions trading systems of 5 November 2020 on amending Annexes I and II to the Agreement and the adoption of Linking Technical Standards (LTS) (2021/1034)
Executive Summary:
This decision, No 2/2020, from the Joint Committee, amends Annexes I and II of the Agreement between the EU and Switzerland on linking their greenhouse gas emissions trading systems. It adopts Linking Technical Standards (LTS) to establish a secure connection between the Swiss Supplementary Transaction Log (SSTL) and the European Union Transaction Log (EUTL). The decision sets up a working group to ensure proper implementation and entered into force on the day of its adoption, November 5, 2020.
Key Points / Main Content:
* **Amendments to Annex I:**
* Aircraft operators attributed to Switzerland for the first time after the agreement's entry into force will be administered by Switzerland after April 30 of the attribution year, once the provisional registry link is operational.
* **Amendments to Annex II:**
* The Linking Technical Standards (LTS) shall specify that communications between SSTL and EUTL consist of secure exchanges of webservices messages based on specified technologies or equivalent.
* **Adoption of Linking Technical Standards (LTS):**
* The LTS, as annexed to the decision, are adopted to ensure a robust and secure connection between the SSTL and EUTL.
* LTS includes glossary of business and technical acronyms and definitions.
* Provisional solution will use file exchange mechanism instead of web services.
* Communication between registries will be based on message exchange mechanism through secured channels.
* Defines XML message content and structure, including headers with originating ETS system and sequence number.
* Specifies data transfer security measures, including network access control, VPN, secure message exchange transfer protocol, and XML encryption and signature.
* Outlines functions under the link, including external transfer, international allocation, reversal of international allocation, and return of excess allocation.
* Defines reconciliation protocol to take place after messages ingestion, validation, and processing.
* Includes test message provision for end-to-end communication testing.
* Specifies data logging requirements for transaction logs, reconciliation logs, message archive, and internal audit logs.
* Details communication availability design, including ICT infrastructure resilience, custom software resilience, and service resilience.
* Defines initialisation, communication, reactivation, and testing plan.
* Describes acceptance testing environments: Production, Acceptance, and Test.
* Two-person method for operations occurring in the link between the Union Registry and the Swiss registry.
* Security testing infrastructure to be set up, separate from the production environment.
* Provisions for link suspension and reactivation due to administrative, security, or IT infrastructure breakdowns.
* Security breach provisions, with handling instructions in accordance with the COP.
* Software security testing guidelines, including penetration testing, for new major releases.
* Infrastructure to be regularly scanned for vulnerabilities.
* Risk assessment provisions.
* **Working Group Establishment:**
* A working group is established to assist the Joint Committee in ensuring proper implementation of the Agreement, including the development of technical guidelines for the implementation of the LTS.
* The working group shall include at least the Swiss registry administrator and the Union central administrator.
Impact Analysis
* **Swiss Registry Administrator and Union Central Administrator:**
* *Impact:* Responsible for developing and implementing the Linking Technical Standards (LTS) and further technical guidelines. Also, they are key members of the established working group.
* *Action Required:* Develop and implement the LTS, participate in the working group, and adapt to technical progress and new requirements.
* **Aircraft Operators:**
* *Impact:* Those newly attributed to Switzerland will be administered by Switzerland after April 30th of the attribution year, once the registry link is operational.
* *Action Required:* Be aware of the change in administration and ensure compliance with the relevant ETS.
* **Joint Committee:**
* *Impact:* Oversees the implementation of the Agreement and the LTS, and relies on the working group for assistance.
* *Action Required:* Ensure the proper implementation of the agreement with the assistance of the working group and make decisions based on their recommendations.
Key Entities Referenced
European Union: One of the parties in the agreement, involved in linking their greenhouse gas emissions trading systems.
Swiss Confederation: One of the parties in the agreement, involved in linking their greenhouse gas emissions trading systems.
Agreement between the European Union and the Swiss Confederation on the linking of their greenhouse gas emissions trading systems: The primary agreement that establishes the framework for linking the greenhouse gas emissions trading systems of the European Union and the Swiss Confederation.
Greenhouse Gas Emissions Trading Systems: The emissions trading schemes of both the European Union and Switzerland, which are being linked by this agreement.
Linking Technical Standards LTS: Detailed technical standards developed to ensure a robust and secure connection between the Swiss Supplementary Transaction Log (SSTL) and the European Union Transaction Log (EUTL).
Swiss Supplementary Transaction Log SSTL: The transaction log of the Swiss registry for emissions trading.
European Union Transaction Log EUTL: The transaction log of the European Union registry for emissions trading.
Joint Committee: The committee established by the agreement between the European Union and the Swiss Confederation, responsible for overseeing the implementation and adaptation of the agreement, including the adoption of Linking Technical Standards (LTS) and technical guidelines.
L 226/16 E N O f f i c i a l J o u r n a l o f t h e E u r o p e a n Union 25.6.2021
DECISION No 2/2020 OF THE JOINT COMMITTEE ESTABLISHED BY THE AGREEMENT
BETWEEN THE EUROPEAN UNION AND THE SWISS CONFEDERATION ON THE LINKING OF
THEIR GREENHOUSE GAS EMISSIONS TRADING SYSTEMS
of 5 November 2020
on amending Annexes I and II to the Agreement and the adoption of Linking Technical Standards
(LTS) (2021/1034)
THE JOINT COMMITTEE,
Having regard to the Agreement between the European Union and the Swiss Confederation on the linking of their
greenhouse gas emissions trading systems(1)(‘the Agreement’) and in particular Article 3(7) and Article 13(2) thereof,
Whereas:
(1) Decision No 2/2019 of the Joint Committee of 5 December 2019(2)amended Annexes I and II to the Agreement
thus fulfilling the conditions for linking set out in the Agreement.
(2) Following adoption of Decision No 2/2019 of the Joint Committee and pursuant to Article 21(3) of the Agreement,
the Parties exchanged their instruments of ratification or approval, since they consider all conditions for linking as
set out in the Agreement to have been fulfilled.
(3) In accordance with Article 21(4) of the Agreement, the Agreement entered into force on 1 January 2020.
(4) Annex I to the Agreement should be amended in accordance with Article 13(2) of the Agreement to ensure a
smooth transition in administration of aircraft operators attributed to Switzerland for the first time by taking
account of the progress made on establishing the registry link.
(5) In order to accommodate recent developments and ensure an increased level of flexibility to establish the registry
link required by the Agreement, Annex II to the Agreement should be amended in accordance with Article 13(2) of
the Agreement to provide for a larger, but equivalent set of technologies to set up the registry link.
(6) Pursuant to Article 3(7) of the Agreement, the Swiss registry administrator and the Union central administrator
should develop Linking Technical Standards (LTS) based on the principles set out in Annex II of the Agreement. The
LTS should describe the detailed requirements for establishing a robust and secure connection between the Swiss
Supplementary Transaction Log (SSTL) and the European Union Transaction Log (EUTL). The LTS should take effect
when adopted by decision of the Joint Committee.
(7) In accordance with Article 13(1) of the Agreement, the Joint Committee should agree on technical guidelines to
ensure the proper implementation of the Agreement including on establishing a robust and secure connection
between the SSTL and the EUTL. Technical guidelines may be developed by a working group set up pursuant to
Article 12(5) of the Agreement. The working group should at least include the Swiss registry administrator and the
Union central administrator and should assist the Joint Committee in its functions under Article 13 of the
Agreement.
(8) In view of the technical nature of the guidelines and the need to adapt them to ongoing developments, the technical
guidelines developed by the Swiss registry administrator and the Union central administrator should be submitted to
the Joint Committee for information or, where appropriate, approval,
(1) OJ L 322, 7.12.2017, p. 3.
(2) Decision no 2/2019 of the Joint Committee established by the Agreement between the European Union and the Swiss Confederation
on the linking of their greenhouse gas emissions trading systems of 5 December 2019 amending Annexes I and II to the Agreement
between the European Union and the Swiss Confederation on the linking of their greenhouse gas emissions trading systems (OJ L 314,
29.9.2020, p. 68).25.6.2021 E N O f f i c i a l J o u r n a l o f t h e E u r o p e a n Union L 226/17
HAS ADOPTED THIS DECISION:
Article 1
The second paragraph of point 17 in Part B of Annex I to the Agreement is hereby replaced by the following text:
‘Aircraft operators attributed to Switzerland for the first time after the entry into force of this Agreement shall be
administered by Switzerland after 30 April of the year of attribution and once the provisional registry link is operational.’.
Article 2
The fourth subparagraph of Annex II to the Agreement is hereby replaced by the following text:
‘The LTS shall specify that the communications between the SSTL and the EUTL consist of secure exchanges of webservices
messages based on the following technologies (*) or equivalent:
— web services using Simple Object Access Protocol (SOAP);
— hardware-based Virtual Private Network (VPN);
— XML (Extensible Markup Language);
— digital signature; and
— network time protocols.
_____________
(*) Those technologies are currently used for establishing a connection between the Union Registry and the International
Transaction Log as well as between the Swiss Registry and the International Transaction Log.’
Article 3
The Linking Technical Standards (LTS), as annexed to this Decision, are hereby adopted.
Article 4
Herewith, a working group shall be set up pursuant to Article 12(5) of the Agreement. It shall assist the Joint Committee in
ensuring the proper implementation of the Agreement including the development of technical guidelines for the
implementation of the LTS.
The working group shall at least include the Swiss registry administrator and the Union central administrator.
Article 5
This Decision shall enter into force on the day of its adoption.
Done at Brussels, 5 November 2020.
For the Joint Committee The Chair Secretary for Switzerland
Secretary for the European Union Beatriz YORDI Caroline BAUMANN
Maja-Alexandra DITTELL 226/18 E N O f f i c i a l J o u r n a l o f t h e E u r o p e a n Union 25.6.2021
ANNEX
Linking technical standards (LTS) pursuant to Article 3(7) of the Agreement between the European
Union and the Swiss Confederation on the linking of their greenhouse gas emissions trading systems
STANDARDS FOR PROVISIONAL SOLUTION
1. Glossary
Table 1-1
Business Acronyms and Definitions
Acronym/Term Definition
Allowance An allowance to emit one tonne of carbon dioxide equivalent during a specified
period, which shall be valid only for the purposes of meeting the requirements under
the EU ETS or the ETS of Switzerland.
CH Swiss Confederation
CHU Swiss general allowances (Term ‘CHU2’is used as abbreviation for commitment
period 2 CHU allowances)
CHUA Swiss Aviation Allowance
COP Common Operational Procedures jointly developed by the Parties to the Agreement
to operationalise the link between the EU ETS and the ETS of Switzerland.
ETR Emissions Trading Registry
ETS Emissions Trading System
EU European Union
EUA EU General Allowance
EUAA EU Aviation Allowance
EUCR European Union Consolidated Registry
EUTL European Union Transaction Log
Registry An accounting system for allowances issued under the ETS, which keeps track of the
ownership of allowances held in electronic accounts.
SSTL Swiss Supplementary Transaction Log
Transaction A process in a registry that includes the transfer of an allowance from one account to
another account.
Transaction log system The transaction log contains a record of each proposed transaction sent from one
Registry to the other.
Table 1-2
Technical Acronyms and Definitions
Acronym Definition
Asymmetric cryptography Uses public and private keys to encrypt and decrypt data.
Certificate Authority (CA) Entity that issues digital certificates.25.6.2021 E N O f f i c i a l J o u r n a l o f t h e E u r o p e a n Union L 226/19
Acronym Definition
Cryptographic key A piece of information that determines the functional output of a cryptographic
algorithm.
Decryption Reverse process of encryption.
Digital signature A mathematical technique used to validate the authenticity and integrity of a
message, software or digital document.
Encryption The process of converting information or data into a code, especially to prevent
unauthorized access.
File ingestion The process of reading a file.
Firewall Network security appliance or software that monitors and controls incoming and
outgoing network traffic based on predetermined rules.
Heartbeat monitoring Periodic signal generated and monitored by hardware or software to indicate normal
operation or to synchronize other parts of a computer system.
IPSec IP SECurity. Network protocol suite that authenticates and encrypts the packets of
data to provide secure encrypted communication between two computers over an
Internet Protocol network.
Penetration testing Practice of testing a computer system, network or web application to find security
vulnerabilities that an attacker could exploit.
Reconciliation process Process of ensuring that two sets of records are in agreement.
VPN Virtual Private Network.
XML Extensible Mark-up Language. It allows designers to create their own customised
tags, enabling the definition, transmission, validation, and interpretation of data
between applications and between organisations.
2. Introduction
The Agreement between the European Union and the Swiss Confederation on the linking of their greenhouse gas
emissions trading systems of 23 November 2017 (‘Agreement’) provides for the mutual recognition of emission
allowances that can be used for compliance under the Emissions Trading System of the European Union (‘EU ETS’)
or the Emissions Trading System of Switzerland (‘ETS of Switzerland’). To operationalise the link between the EU
ETS and the ETS of Switzerland, a direct link between the European Union Transaction Log (EUTL) of the Union
Registry and the Swiss Supplementary Transaction Log (SSTL) of the Swiss registry will be established, which will
enable the registry-to-registry transfer of emission allowances issued under either ETS (Article 3(2) of the
Agreement). To operationalise the link between the EU ETS and the ETS of Switzerland, a provisional solution shall
be in place by May 2020 or as soon as possible thereafter. Parties shall cooperate to replace the provisional solution
with a permanent registry link as soon as possible (Annex II to the Agreement).
Pursuant to Article 3(7) of the Agreement, the Swiss registry administrator and the Union central administrator shall
develop Linking Technical Standards (LTS) based on the principles set out in Annex II to the Agreement, describing
the detailed requirements for establishing a robust and secure connection between the SSTL and the EUTL. The LTS
developed by the administrators shall take effect when adopted by a decision of the Joint Committee.L 226/20 E N O f f i c i a l J o u r n a l o f t h e E u r o p e a n Union 25.6.2021
The LTS, as recorded in this document is to be adopted by the Joint Committee by its Decision No 2/2020. In
accordance with this Decision, the Joint Committee shall request the Swiss registry administrator and the Union
central administrator to develop further technical guidelines to operationalise the link and to ensure that these are
continuously adapted to technical progress and new requirements relating to the safety and security of the link and
to its effective and efficient operation.
2.1. Scope
This document represents the common understanding between the Parties to the Agreement regarding the
establishment of the technical foundations of the link between the registries of the EU ETS and the ETS of
Switzerland. While it outlines the baseline for the technical specifications in terms of architectural, service and
security requirements, some further detailed guidance will be needed to operationalise the link.
For its proper functioning, the link will require processes and procedures in order to further operationalise it.
Pursuant to Article 3(6) of the Agreement, those matters are detailed in a separate common operational procedures
(COP) document, to be adopted separately by decision of the Joint Committee.
2.2. Addressees
This document is addressed to the Swiss registry administrator and the Union central administrator.
3. General provisions
3.1. Architecture of the Communication Link
The purpose of this section is to provide a description of the general architecture of the operationalisation of the
link between the EU ETS and the ETS of Switzerland and the different components involved in it.
Security being a key part of the definition of the architecture of the registry link, all measures have been taken to
have a robust architecture. Although the foreseen permanent registry link will be based on web services, the
provisional solution will use a file exchange mechanism instead.
The technical solution uses:
— A secure message exchange transfer protocol;
— XML messages;
— XML based digital signature and encryption;
— VPN Appliance or equivalent secure data transport network.
3.1.1. Message Exchange
The communication between the Union Registry and the Swiss registry will be based on a message exchange
mechanism through secured channels. Each end will count on its own repository of received messages.
Both Parties will keep a log of the messages received, together with the processing details.
Errors or an unexpected status are to be reported as alerts and human contact between the support teams should
take place.
Errors and unexpected events will be handled in observance of the operational procedures laid down in the
incident management process of the COP.
3.1.2. XML Message – High level Description
An XML Message contains one of the following:
— One or several Transaction Requests and/or one or several Transaction Responses;
— One operation/response related to reconciliation;
— One Test message.25.6.2021 E N O f f i c i a l J o u r n a l o f t h e E u r o p e a n Union L 226/21
Every message contains a header with:
— Originating ETS system;
— Sequence Number.
3.1.3. Ingestion windows
The provisional solution is based on predefined ingestion windows that are followed by a set of named events.
Transaction requests received through the link will only be ingested at predefined intervals. Ingestion windows
include a technical validation for outgoing and incoming transactions. In addition, reconciliations may run on a
daily basis and can be triggered manually.
Changes in the frequency and/or timing of any of these events will be handled in observance of the operational
procedures laid down in the request fulfilment process of the COP.
3.1.4. Transaction Message Flows
Outgoing transactions
This reflects the point of view of the transferring ETS. The sequence diagram above depicts all the specific outgoing
transaction flows.
Main flow ‘Normal Transaction’(with steps indicated in the drawing above):
(a) On the transferring ETS, the transaction request is sent from the registry to the Transaction log, once all the
business delays are over (24 hours delay, where applicable);
(b) Transaction log validates the transaction request;
(c) The transaction request is sent to the destination ETS;
(d) The acceptance response is sent to the originating ETS registry;L 226/22 E N O f f i c i a l J o u r n a l o f t h e E u r o p e a n Union 25.6.2021
(e) The destination ETS validates the transaction request;
(f) The destination ETS sends the acceptance response back to the originating ETS Transaction log;
(g) The Transaction log sends the acceptance response to the registry.
Alternative flow ‘Transaction Log Rejection’(with steps indicated in the drawing above, starting equally from (a)):
(a) In the originating ETS, the transaction request is sent from the registry to the Transaction log, once all the
business delays are over (24 hours delay, where applicable).
Followed by:
(b) Transaction log does not validate the request;
(c) Rejection message is sent to the originating registry.
Alternative flow ‘ETS Rejection’(with steps indicated in the drawing above, starting from (a)):
(a) In the originating ETS, the transaction request is sent from the registry to the Transaction log, once all business
delays are over (24 hours delay, where applicable);
(b) Transaction log validates the transaction;
(c) The transaction request is sent to the destination ETS;
(d) The acceptance message is sent to the originating ETS registry.
Followed by:
(e) The acquiring ETS Transaction log does not validate the transaction;
(f) Acquiring ETS sends the refusal response to the transferring ETS Transaction log;
(g) Transaction log send the refusal to the registry.
Incoming Transactions
This reflects the point of view of the acquiring ETS. The specific flow is depicted in the following sequence diagram:25.6.2021 E N O f f i c i a l J o u r n a l o f t h e E u r o p e a n Union L 226/23
The diagram shows:
1. When the acquiring ETS Transaction log validates the request, it sends the acceptance message to the
Transferring ETS and a ‘transaction completed’message to the acquiring ETS registry;
2. When an incoming request is refused on the acquiring Transaction log and it is refused, the transaction request is
not sent to the acquiring ETS registry.
Protocol
The transaction message cycle involves only two messages:
— Transferring ETS → Acquiring ETS Transaction Proposal;
— Acquiring ETS → Transferring ETS Transaction Response: Either Accepted or Rejected (including the reason for
rejection):
— Accepted: Transaction is completed;
— Rejected: Transaction is terminated.
Transaction status
— Transferring ETS transaction status will be set to ‘proposed’when the request is sent.
— Acquiring ETS transaction status will be set to ‘proposed’ when the request is received and while it is being
treated.
— Acquiring ETS transaction status will be set to ‘completed’/’terminated’, when the proposal is processed.
Acquiring ETS will then send the corresponding acceptance/rejection message.
— Transferring ETS transaction status will be set to ‘completed’/’terminated’ when the acceptance/rejection is
received and processed.
— In the Transferring ETS the transaction status will remain as proposed if no response is received.
— Acquiring ETS transaction status will be set to ‘terminated’if any proposed transaction stays in the ‘proposed’
state for more than 30 minutes.
Incidents related to transactions will be handled in observance of the operational procedures laid down in the
incident management process of the COP.
3.2. Data Transfer Security
The data in transit will be subject to four levels of security:
(1) Network access control: Firewall and network interconnection layer;
(2) Transport level encryption: VPN or equivalent secure data transport network;
(3) Session level encryption: Secure message exchange transfer protocol;
(4) Application level encryption: XML Content encryption and signature.
3.2.1. Firewall and Network Interconnection
The link shall be established over a network protected by a hardware-based firewall. The firewall shall be configured
with rules such that only ‘registered’clients can make connections to the VPN server.
3.2.2. Virtual Private Network (VPN)
All communications between the Parties shall be protected using a secure data transport technology. In the case of a
Virtual Private Network (VPN), the infrastructure should be based on hardware or virtual appliances. VPN
technologies provide the ability to ‘tunnel’ through a network like the Internet from one point to another,
protecting all communications. Prior to the creation of the VPN tunnel, a digital certificate is issued to a
prospective client end-point, allowing the client to provide proof of identity during the negotiation of the
connection. Each Party is responsible for installing the certificate into its VPN end-point. Using digital certificates,
each end VPN server will access a central authority to negotiate authentication credentials. During the tunnel
creation process, encryption is negotiated, ensuring that all communications through the tunnel are protected.L 226/24 E N O f f i c i a l J o u r n a l o f t h e E u r o p e a n Union 25.6.2021
The client VPN end-points shall be configured to maintain the VPN tunnel permanently, in order to allow reliable,
two-way, real-time communication between the Parties at all times.
Any other equivalent solution shall be compliant with the abovementioned principles.
3.2.3. IPSec Implementation
In case of using a VPN solution, the use of the IPSec protocol to form the site-to-site VPN infrastructure will provide
for site-to-site authentication, data integrity, and data encryption. IPSec VPN configurations ensure proper
authentication between two end-points in a VPN connection. The Parties will identify and authenticate the remote
client via the IPSec connection using a digital certificates provided by a Certificate Authority recognised by the
other end.
IPSec also ensures data integrity of all communications passed through the VPN tunnel. Data packets are hashed and
signed using the authentication information established by the VPN. Confidentiality of the data is assured likewise
by enabling IPSec encryption.
3.2.4. Secure Message Exchange Transfer Protocol
The provisional solution relies on multiple encryption layers to securely exchange data between the Parties. Both
systems and their different environments are interconnected at the network level by means of VPN tunnels or
equivalent secure data transport networks. At the application level files are transferred using a secure message
exchange transfer protocol at session level.
3.2.5. XML Encryption and Signature
Within XML files, signing and encryption occurs at two levels. Every transaction request, transaction response and
reconciliation message is digitally signed individually.
In a second step, every sub element of the ‘message’element is individually encrypted.
In addition, as a third step and to ensure the integrity and non-repudiation of the whole message, the root element
message is digitally signed. This results in a high level of protection for the XML embedded data. The technical
implementation observes the World Wide Web Consortium standards.
To decrypt and verify the message, the process is followed in reverse order.
3.2.6. Cryptographic Keys
Public key cryptography will be used for encryption and signing.
For the specific case of IPSec, a digital certificate issued by a Certificate Authority (CA) trusted by both Parties shall
be used. This CA verifies the identity of the certificate holder and issues certificates which are used to positively
identify an organisation and set up secure data communications channels between the Parties.
Cryptographic keys are used for signing and encrypting communication channels and data files. The public
certificates are digitally exchanged by the Parties using secure channels and verified out of band. This procedure
is an integral part of the Information Security Management process of the COP.
3.3. List of Functions under the Link
The link specifies the transmission system for a series of functions that implement the business processes derived
from the Agreement. The link also includes the specification for the reconciliation process and for the test messages
that will allow the implementation of heartbeat monitoring.
3.3.1. Business Transactions
From the business perspective, the link contemplates four (4) types of Transaction Requests:
— External transfer:
— After entry into force of the ETS linking, EU and CH allowances are fungible, and thus fully transferrable,
between the Parties;25.6.2021 E N O f f i c i a l J o u r n a l o f t h e E u r o p e a n Union L 226/25
— A transfer sent through the link will involve a transferring account on an ETS and acquiring account on the
other ETS;
— The transfer can include any amount of the four (4) types of allowances:
— Swiss general allowances (CHU);
— Swiss aviation allowances (CHUA);
— EU general allowances (EUA);
— EU aviation allowances (EUAA).
— International Allocation:
Aircraft Operators administered by one ETS with obligations on the other ETS and entitled to receive free
allowances from that second ETS, will receive free aviation allowances, from the second ETS, by means of the
international allocation transaction.
— Reversal of International Allocation:
This transaction will happen in the case that free allowances allocated to an aircraft operator holding by the
other ETS have to be reversed in total.
— Return of Excess Allocation:
Similar to the reversal, but where the allocation does not need to be fully reversed, and only the over-allocated
allowances have to be returned to the allocating ETS.
3.3.2. Reconciliation Protocol
Reconciliations will only take place after the windows for messages ingestion, validation and processing are closed.
Reconciliations are an integral part of the security and consistency measures of the linking. Both Parties will agree
on the exact timing of reconciliation before creating any schedule. A daily scheduled reconciliation can take place if
agreed by both Parties. At a minimum, at least one scheduled reconciliation will be executed after each ingestion
takes place.
In any case, either Party can initiate manual reconciliations at any time.
Changes in the timing and frequency of the scheduled reconciliation will be handled in observance of the
operational procedures laid down in the request fulfilment process of the COP.
3.3.3. Test Message
A test message is provided for to test end-to-end communication. The message will contain data that will identify the
message as a test and will be answered upon reception by the other end.
3.4. Standards for Web Services
Web services will not be used in the provisional solution. It is worth noting however that the shape and format of
XML messages will remain unchanged to a great extent. With the introduction of the permanent registry link in the
future, web services should allow the exchange of XML messages in real-time.
3.5. Web Services Specific Definition
This section is not applicable for the provisional solution. As mentioned in the previous section, web services will
only be used in the future permanent registry link.
3.6. Data Logging Requirements
To support the need for both Parties to maintain accurate and consistent information, and to provide tools for use in
the reconciliation process to resolve inconsistencies, four (4) types of data logs shall be maintained by both Parties:
— Transaction logs;
— Reconciliation logs;L 226/26 E N O f f i c i a l J o u r n a l o f t h e E u r o p e a n Union 25.6.2021
— Message archive;
— Internal audit logs.
All data in these logs shall be maintained at least during three (3) months for the purposes of troubleshooting and
their further retention will depend on the applicable law at each end for the purpose of auditing. Log files older
than three (3) months may be archived into a secure location in an independent IT system, as long as they can be
retrieved or accessed within a reasonable period.
Transaction Logs
Both EUTL and SSTL subsystems contain Transaction log implementations.
More specifically, the Transaction logs will keep a record of each proposed transaction sent to the other ETS. Each
record contains all the fields of the transaction content and the subsequent outcome of the transaction (the
response of the receiving ETS). The Transaction logs will also keep a record for the incoming transactions as well as
the response sent to the originating ETS.
Reconciliation Logs
The Reconciliation Log contains a record of each reconciliation message exchanged between both Parties, including
the reconciliation id, the timestamp and the result of the reconciliation: Reconciliation status ‘Pass’ or
‘Discrepancies’. In the provisional solution reconciliation messages are an integral part of the messages exchanged.
Both Parties shall log each request and its response in the Reconciliation Log. Although information in the
Reconciliation Log is not shared directly as part of the Reconciliation itself, access to this information may be
necessary in order to resolve inconsistencies.
Message Archive
Both Parties are required to archive a copy of the exchanged data (the XML files), sent and received, and whether
those or XML messages were correct in their format or not.
The main purpose of the archive is for auditing, to have evidence of what was sent and received to and from the
other Party. In that sense, along with the files, the related certificates need to be archived as well.
These files will also provide additional information for troubleshooting.
Internal Audit Log
These logs are defined and used by each Party on its own.
3.7. Operational Requirements
The exchange of data between both systems is not fully autonomous in the provisional solution, this means it
requires operators and procedures to operationalise the link.
4. Availability provisions
4.1. Communication Availability Design
The architecture for the provisional solution is fundamentally an ICT infrastructure and software that allows the
communication between the ETS of Switzerland and the EU ETS. Ensuring high levels of availability, integrity and
confidentiality of this flow of data therefore becomes an essential aspect to consider in the design of the provisional
solution and the permanent registry link. Being a project in which the ICT infrastructure, the custom made software,
and the processes play an integral role, all three elements have to be taken into account in order to design a resilient
system.
ICT infrastructure resilience
The general provisions chapter of this document details the architectural building blocks. On the ICT infrastructure
side, the provisional linking sets up a resilient VPN network (or equivalent) that creates secure communication
tunnels over which secure message exchanges can take place. Other infrastructure elements are configured in high-
availability and/or count on fall-back mechanisms.
Custom Software resilience
The custom developed software modules enhance the resilience by retrying the communication for a given period of
time with the other end if due to any reason, it is not available.25.6.2021 E N O f f i c i a l J o u r n a l o f t h e E u r o p e a n Union L 226/27
Service resilience
In the provisional solution, data exchanges between Parties occur at predefined timeslots throughout the year. Some
of the steps required in the prescheduled data exchanges require manual intervention by system operators and/or
registry administrators. Taking this aspect into account, and in order to increase the availability and success of the
exchanges:
— The operational procedures foresee significant time windows to perform each step;
— The software modules for the provisional solution implement asynchronous communication;
— The automatic reconciliation process will detect if there were issues in the ingestion of data files at either end;
— Monitoring processes (ICT infrastructure and custom software modules) are considered in, and trigger, Incident
Management procedures (as defined in the common operational procedures document). Those procedures that
aim at reducing the time to restore normal operation following incidents are essential to ensure high availability
ratios.
4.2. Initialisation, Communication, Re-activation and Testing Plan
All different elements involved in the architecture of the provisional solution shall pass a series of individual and
collective tests in order to confirm the platform is ready at ICT infrastructure and information system level. These
operational tests are a compulsory prerequisite each time the platform transitions the provisional solution from
suspended to operational status.
The operational status activation of the link requires then the successful execution of a predefined test plan. This
shall confirm that each registry has performed a set of internal test first, followed by end-to-end connectivity
validation prior to beginning the submission of production transactions between both Parties.
The test plan should mention the overall test strategy and details about the testing infrastructure. In particular, for
each element in every test block it should include:
— The test criteria and tools;
— The roles assigned to perform the test;
— The expected results (positive and negative);
— Test schedule;
— The logging of test results requirements;
— Troubleshooting documentation;
— Escalation provisions.
As a process, the operational status activation tests could be split into four (4) conceptual blocks or phases:
4.2.1. Internal ICT Infrastructure Tests
These tests are meant to be performed and/or checked individually by both Parties at each end.
Every element of ICT infrastructure at each end shall be tested individually. This includes every single component of
the infrastructure. These tests can be executed automatically or manually but shall verify that every element of the
infrastructure is operational.
4.2.2. Communication Tests
These tests are triggered individually by either Party and concluding the tests requires the cooperation of the other
end.
Once individual elements are operational, the communication channels between both registries needs to be tested.
To this end, each Party shall verify that Internet access works, the VPN tunnels (or equivalent secure transport
network) are established, and there is site-to-site IP connectivity. Reachability of the local and remote infrastructure
elements and IP connectivity should then be confirmed at the other end.L 226/28 E N O f f i c i a l J o u r n a l o f t h e E u r o p e a n Union 25.6.2021
4.2.3. Full System (end-to-end) Tests
These tests are meant to be executed at each end and results shall be shared with the other Party.
Once communication channels and each individual component of both registries have been tested, each end shall
prepare a series of simulated transactions and reconciliation that are representative of all functions to be
implemented under the link.
4.2.4. Security Tests
These tests are meant to be performed and/or triggered by both Parties at each end and as detailed in sections 5.4,
‘Security Testing Guidelines’, and 5.5, ‘Risk Assessment Provisions’.
Only after each of the four phases/blocks have ended with a predictable results can the provisional link be
considered in operational status.
Testing resources
Each Party shall count on specific testing resources (specific ICT infrastructure software and hardware) and shall
develop testing functions in their respective systems in order to support the manual and continuous validation of
the platform. Manual individual or cooperative testing procedures can be executed at any time by registry
administrators. Operational status activation is a manual process in itself.
It is likewise provided for that the platform performs automatic checks at regular intervals. Those checks are aimed
at increasing the availability of the platform by detecting early potential infrastructure or software issues. This
platform monitoring plan is composed of two elements:
— ICT infrastructures monitoring: at both ends the infrastructure will be monitored by the ICT infrastructure
service providers. The automatic tests will cover the different infrastructure elements and the availability of
communication channels.
— Application monitoring: the provisional linking software modules will implement system communication
monitoring at application level (either manually and/or at regular intervals) that will test the end-to-end
availability of the linking by simulating some of the transactions over the link.
4.3. Acceptance/Testing Environments
The architecture of the Union Registry and the registry of Switzerland consist of the following three environments:
— Production (PROD): This environment holds the real data and processes real transactions;
— Acceptance (ACC): This environment contains non-real or anonymised, representative data. It is the
environment where system operators by both Parties validate new releases;
— Test (TEST): This environment contains non-real or anonymised, representative data. This environment is limited
to registry administrators and is meant to be used to perform integration tests by both Parties.
Except for the VPN (or equivalent network), the three environments are fully independent of each other, meaning
hardware, software, databases, virtual environments, IP-addresses and ports are set up and operate independently of
each other.
As for the VPN layout, this is set up in two different environments, one for PROD, another independent one for ACC
and TEST.
5. Confidentiality and integrity provisions
Security Mechanisms and Procedures provide for a two-person method (4-eye principle) for operations occurring in
the link between the Union Registry and the Swiss registry. The two-person method shall apply whenever necessary.
However, it might not apply to all steps undertaken by registry administrators.
The security requirements are considered and addressed in the security management plan, which also includes
processes related to the handling of security incidents following an eventual security breach. The operational part
of these processes is described in the COP.25.6.2021 E N O f f i c i a l J o u r n a l o f t h e E u r o p e a n Union L 226/29
5.1. Security Testing Infrastructure
Each Party commits to setting up a security testing infrastructure (by using the common set software and hardware
used in the detection of vulnerabilities at development and operation phases):
— Separated from the production environment;
— Where security is analysed by a team independent from the development and the operation of the system.
Each Party commits to performing both static and dynamic analysis.
In the case of dynamic analysis (like penetration testing), both Parties commit to restricting the evaluations
ordinarily to the test and acceptance environments (as defined in section 4.3, ‘Acceptance/Testing environments’).
Exceptions to this policy are subject to the approval of both Parties.
Before being deployed in the production environment, every software module of the link (as defined in section 3.1,
‘Architecture of the communication link’) shall be security tested.
Testing infrastructure must be separated at both network and infrastructure levels from the production
infrastructure. The security tests required to check compliance with security requirements are carried out within the
testing infrastructure.
5.2. Link Suspension and Reactivation Provisions
Where there is a suspicion that the security of the registry of Switzerland, the SSTL, the Union registry or the EUTL
has been compromised, either Party shall immediately inform the other and suspend the link between the SSTL and
the EUTL.
The procedures for information sharing, for a decision to suspend and for a decision to reactivate are part of the
Request Fulfilment process of the COP.
Suspensions
Suspension of the registry link in accordance with the Annex II of the Agreement may happen due to:
— Administrative reasons (for example, maintenance), which are planned;
— Security reasons (or IT infrastructure breakdowns), which are unplanned.
In case of an emergency, either Party will inform the other Party and suspend unilaterally the registry link.
If the decision is made to suspend the registry link, each Party will therefore ensure that the link is interrupted at
network level (by blocking parts or all of incoming and outgoing connections).
The decision to suspend the registry link, whether it is planned or unplanned, will be taken in accordance with
the Change Management or Security Incident Management procedure of the COP.
Communication Reactivation
A decision to reactivate the registry link will be taken in the manner detailed in the COP and in any case not before
the successful completion of the security testing procedures as detailed in sections 5.4, ‘Security testing guidelines’,
and 4.2, ‘Initialisation, Communication, Re-activation and Testing Plan’.
5.3. Security Breach Provisions
A security breach is considered to be a Security Incident impacting the confidentiality and the integrity of any
sensitive information and/or the availability of the system handling them.
Sensitive information is identified in the Sensitive Information List and may be handled in the system or in any
related part of the system.L 226/30 E N O f f i c i a l J o u r n a l o f t h e E u r o p e a n Union 25.6.2021
Information directly related to the security breach will be considered to be sensitive, marked ‘ETS CRITICAL’ and
handled in accordance with the handling instructions, unless specified otherwise.
Every security breach will be handled in accordance with the Security Incident Management chapter of the COP.
5.4. Security Testing Guidelines
5.4.1. Software
Security testing, including penetration testing, if applicable, shall be performed at least on all new major releases of
the software in accordance with the security requirements set out in the LTS in order to assess the security of the
linking and the related risks.
If no major release has been produced in the last 12 months, security testing shall be performed on the current
system, taking into account the cyber threat evolution that occurred in the last 12 months.
Security testing of the registry link shall be done in the acceptance environment and, if required, in the production
environment and with the coordination and mutual agreement of both Parties.
Web application testing will observe international open standards such as the ones developed by the Open Web
Application Security Project (OWASP).
5.4.2. Infrastructure
The infrastructure supporting the production system shall be regularly scanned against vulnerabilities (at least once
a month) and detected vulnerabilities shall be fixed. Testing is performed according to the method outlined in
section 5.4.1, using an up-to-date vulnerability database.
5.5. Risk Assessment Provisions
If penetration testing is applicable it must be included in the security testing.
Each Party may contract a specialized company for the performance of security testing, provided this company:
— Has the skills and the experience of such security testing;
— Is not reporting directly to the developer and/or its contractor and is neither involved in the development of the
software of the link nor a subcontractor of the developer;
— Has signed Non-Disclosure Agreement to keep the results confidential and to handle them at the ‘ETS CRITICAL’
level in accordance with handling instructions.