See Full Document Text
17.5.2019 EN Official Journal of the European Union L 129/43
ACTS ADOPTED BY BODIES CREATED BY
INTERNATIONAL AGREEMENTS
Only the original UN/ECE texts have legal effect under international public law. The status and date of entry into force of this Regulation
should be checked in the latest version of the UN/ECE status document TRANS/WP.29/343, available at:
http://www.unece.org/trans/main/wp29/wp29wgs/wp29gen/wp29fdocstts.html
Regulation No 134 of the Economic Commission for Europe of the United Nations (UN/ECE) —
Uniform provisions concerning the approval of motor vehicles and their components with regard
to the safety-related performance of hydrogen-fuelled vehicles (HFCV) [2019/795]
Incorporating all valid text up to:
Supplement 3 to the original version of the Regulation — Date of entry into force: 19 July 2018
CONTENTS
REGULATION
1. Scope
2. Definitions
3. Application for approval
4. Approval
5. Part I — Specifications of the compressed hydrogen storage system
6. Part II — Specifications of specific components for the compressed hydrogen storage system
7. Part III — Specifications of a vehicle fuel system incorporating the compressed hydrogen storage system
8. Modification of type and extension of approval
9. Conformity of production
10. Penalties for non-conformity of production
11. Production definitively discontinued
12. Names and addresses of Technical Services responsible for conducting approval tests and of the Type Approval
Authorities
ANNEXES
1 Part 1 Model I — Information document No … on the type approval of a hydrogen storage system with re
gard to the safety-related performance of hydrogen-fuelled vehicles
Model II — Information document No … on the type approval of specific component for a hydrogen
storage system with regard to the safety-related performance of hydrogen-fuelled vehicles
Model III — Information document No … on the type approval of a vehicle with regard to the safety-
related performance of hydrogen-fuelled vehiclesL 129/44 EN Official Journal of the European Union 17.5.2019
Part 2 Model I — Communication concerning the approval or extension or refusal or withdrawal of approval
or production definitively discontinued of a type of compressed hydrogen storage system with regard
to the safety-related performance of hydrogen-fuelled vehicles pursuant to Regulation No 134
Model II — Communication concerning the approval or extension or refusal or withdrawal of
approval or production definitively discontinued of a type of specific component (TPRD/Check valve/
Automatic shut-off valve) with regard to the safety-related performance of hydrogen-fuelled vehicles
pursuant to Regulation No 134
Model III — Communication concerning the approval or extension or refusal or withdrawal of ap
proval or production definitively discontinued of a type of vehicle with regard to the safety-related per
formance of hydrogen-fuelled vehicles pursuant to Regulation No 134
2 Arrangements of the approval marks
3 Test procedures for the compressed hydrogen storage system
4 Test procedures for specific components for the compressed hydrogen storage system
Appendix 1 — Overview of TPRD tests
Appendix 2 — Overview of check valve and automatic shut-off valve tests
5 Test procedures for vehicle fuel system incorporating the compressed hydrogen storage system
1. SCOPE
This Regulation applies to (1):
1.1. Part I — Compressed hydrogen storage systems for hydrogen-fuelled vehicles on their safety-related
performance.
1.2. Part II — Specific components for compressed hydrogen storage systems for hydrogenfuelled vehicles on their
safety-related performance.
1.3. Part III — Hydrogenfuelled vehicles of category M and N (2) incorporating compressed hydrogen storage
system on its safety-related performance.
2. DEFINITIONS
For the purpose of this Regulation, the following definitions shall apply:
2.1. ‘Burst disc’ means the non-reclosing operating part of a pressure relief device which, when installed in the
device, is designed to burst at a predetermined pressure to permit the discharge of compressed hydrogen.
2.2. ‘Check valve’ means a non-return valve that prevents reverse flow in the vehicle fuel line.
2.3. ‘Compressed hydrogen storage system (CHSS)’ means a system designed to store hydrogen fuel for
a hydrogen-fuelled vehicle and composed of a pressurised container, pressure relief devices (PRDs) and shut
off device(s) that isolate the stored hydrogen from the remainder of the fuel system and its environment.
2.4. ‘Container’ (for hydrogen storage) means the component within the hydrogen storage system that stores the
primary volume of hydrogen fuel.
2.5. ‘Date of removal from service’ means the date (month and year) specified for removal from service.
(1) This Regulation does not cover the electrical safety of electric power train, the material compatibility and hydrogen embrittlement of the
vehicle fuel system, and the post crash fuel system integrity in the event of full width frontal impact and rear impact.
(2) As defined in the Consolidated Resolution on the Construction of Vehicles (R.E.3.), document ECE/TRANS/WP.29/78/Rev.3, para. 2. —
www.unece.org/trans/main/wp29/wp29wgs/wp29gen/wp29resolutions.html17.5.2019 EN Official Journal of the European Union L 129/45
2.6. ‘Date of manufacture’ (of a compressed hydrogen container) means the date (month and year) of the proof
pressure test carried out during manufacture.
2.7. ‘Enclosed or semi-enclosed spaces’ means the special volumes within the vehicle (or the vehicle outline across
openings) that are external to the hydrogen system (storage system, fuel cell system and fuel flow
management system) and its housings (if any) where hydrogen may accumulate (and thereby pose a hazard),
as it may occur in the passenger compartment, luggage compartment and space under the hood.
2.8. ‘Exhaust point of discharge’ means the geometric centre of the area where fuel cell purged gas is discharged
from the vehicle.
2.9. ‘Fuel cell system’ means a system containing the fuel cell stack(s), air processing system, fuel flow control
system, exhaust system, thermal management system and water management system.
2.10. ‘Fuelling receptacle’ means the equipment to which a fuelling station nozzle attaches to the vehicle and
through which fuel is transferred to the vehicle. The fuelling receptacle is used as an alternative to a fuelling
port.
2.11. ‘Hydrogen concentration’ means the percentage of the hydrogen moles (or molecules) within the mixture of
hydrogen and air (equivalent to the partial volume of hydrogen gas).
2.12. ‘Hydrogen-fuelled vehicle’ means any motor vehicle that uses compressed gaseous hydrogen as a fuel to
propel the vehicle, including fuel cell and internal combustion engine vehicles. Hydrogen fuel for passenger
vehicles is specified in ISO 14687-2: 2012 and SAE J2719: (September 2011 Revision).
2.13. ‘Luggage compartment’ means the space in the vehicle for luggage and/or goods accommodation, bounded by
the roof, hood, floor, side walls, being separated from the passenger compartment by the front bulkhead or
the rear bulkhead.
2.14. ‘Manufacturer’ means the person or body responsible to the approval authority for all aspects of the type
approval process and for ensuring conformity of production. It is not essential that the person or body is
directly involved in all stages of the construction of the vehicle, system or component which is the subject of
the approval process.
2.15. ‘Maximum allowable working pressure (MAWP)’ means the highest gauge pressure to which a pressure
container or storage system is permitted to operate under normal operating conditions.
2.16. ‘Maximum fuelling pressure (MFP)’ means the maximum pressure applied to compressed system during
fuelling. The maximum fuelling pressure is 125 per cent of the Nominal Working Pressure.
2.17. ‘Nominal working pressure (NWP)’ means the gauge pressure that characterises typical operation of a system.
For compressed hydrogen gas containers, NWP is the settled pressure of compressed gas in fully fuelled
container or storage system at a uniform temperature of 15 °C.
2.18. ‘Pressure relief device (PRD)’ means a device that, when activated under specified performance conditions, is
used to release hydrogen from a pressurised system and thereby prevent failure of the system.
2.19. ‘Rupture’ or ‘burst’ both mean to come apart suddenly and violently, break open or fly into pieces due to the
force of internal pressure.
2.20. ‘Safety relief valve’ means a pressure relief device that opens at a preset pressure level and can re-close.
2.21. ‘Service life’ (of a compressed hydrogen container) means the time frame during which service (usage) is
authorised.
2.22. ‘Shut-off valve’ means a valve between the storage container and the vehicle fuel system that can be automati
cally activated; which defaults to the ‘closed’ position when not connected to a power source.
2.23. ‘Single failure’ means a failure caused by a single event, including any consequential failures resulting from
this failure.
2.24. ‘Thermally-activated pressure relief device (TPRD)’ means a non- reclosing PRD that is activated by
temperature to open and release hydrogen gas.L 129/46 EN Official Journal of the European Union 17.5.2019
2.25. ‘Type of hydrogen storage system’ means an assembly of components which do not differ significantly in such
essential aspects as:
(a) The manufacturer's trade name or mark;
(b) The state of stored hydrogen fuel; compressed gas;
(c) The nominal working pressure (NWP);
(d) The structure, materials, capacity and physical dimensions of the container; and
(e) The structure, materials and essential characteristics of TPRD, check valve and shut-off valve, if any.
2.26. ‘Type of specific components of hydrogen storage system’ means a component or an assembly of components
which do not differ significantly in such essential aspects as:
(a) The manufacturer's trade name or mark;
(b) The state of stored hydrogen fuel; compressed gas;
(c) The sort of component: (T)PRD, check-valve or shut-off valve; and
(d) The structure, materials and essential characteristics.
2.27. ‘Vehicle type’ with regard to hydrogen safety means vehicles which do not differ in such essential aspects as:
(a) The manufacturer's trade name or mark; and
(b) The basic configuration and main characteristics of the vehicle fuel system.
2.28. ‘Vehicle fuel system’ means an assembly of components used to store or supply hydrogen fuel to a fuel cell
(FC) or internal combustion engine (ICE).
3. APPLICATION FOR APPROVAL
3.1. Part I: Application for approval of a type of the compressed hydrogen storage system.
3.1.1. The application for approval of a type of hydrogen storage system shall be submitted by the manufacturer of
the hydrogen storage system or by their authorised representative.
3.1.2. A model of information document is shown in Annex 1, Part 1-I.
3.1.3. A sufficient number of hydrogen storage systems representatives of the type to be approved shall be
submitted to the Technical Service conducting the approval tests.
3.2. Part II: Application for approval of a type of specific component for compressed hydrogen storage system.
3.2.1. The application for approval of a type of specific component shall be submitted by the manufacturer of the
specific component or by their authorised representative.
3.2.2. A model of information document is shown in Annex 1, Part 1-II.
3.2.3. A sufficient number of specific components of hydrogen storage system representatives of the type to be
approved shall be submitted to the Technical Service conducting the approval tests.
3.3. Part III: Application for approval of a vehicle type.
3.3.1. The application for approval of a vehicle type shall be submitted by the vehicle manufacturer or by their
authorised representative.17.5.2019 EN Official Journal of the European Union L 129/47
3.3.2. A model of information document is shown in Annex 1, Part 1- III.
3.3.3. A sufficient number of vehicles representatives of the type to be approved shall be submitted to the Technical
Service conducting the approval tests.
4. APPROVAL
4.1. Granting of type approval.
4.1.1. Approval of a type of compressed hydrogen storage system.
If the hydrogen storage system submitted for approval pursuant to this Regulation meets the requirements of
Part I below, approval of that type of hydrogen storage system shall be granted.
4.1.2. Approval of a type of specific component for the compressed hydrogen storage system.
If the specific component submitted for approval pursuant to this Regulation meets the requirements of
Part II below, approval of that type of specific component shall be granted.
4.1.3. Approval of a vehicle type.
If the vehicle submitted for approval pursuant to this Regulation meets the requirements of Part III below,
approval of that vehicle type shall be granted.
4.2. An approval number shall be assigned to each type approved: its first two digits (00 for the Regulation in its
initial form) shall indicate the series of amendments incorporating the most recent major technical
amendments made to the Regulation at the time of issue of the approval. The same Contracting Party shall
not assign the same number to another vehicle or component type.
4.3. Notice of approval or of extension, refusal or withdrawal of approval pursuant to this Regulation shall be
communicated to the Contracting Parties to the Agreement which apply this Regulation by means of a form
conforming to the model in Annex 1, Part 2 and photographs and/or plans supplied by the applicant being
in a format not exceeding A4 (210 × 297 mm), or folded to that format, and on an appropriate scale.
4.4. There shall be affixed, conspicuously and in a readily accessible place specified on the approval form, to every
vehicle, hydrogen storage system or specific component conforming to a type approved under this
Regulation, an international approval mark conforming to the models described in Annex 2, consisting of:
4.4.1. a circle surrounding the letter ‘E’ followed by the distinguishing number of the country which has granted
approval (3);
4.4.2. the number of this Regulation, followed by the letter ‘R’, a dash and the approval number to the right of the
circle prescribed in paragraph 4.4.1.
4.5. If the vehicle conforms to a vehicle type approved under one or more other Regulations, annexed to the
Agreement, in the country which has granted approval under this Regulation, the symbol prescribed in
paragraph 4.4.1 needs not be repeated; in such a case, the Regulation and approval numbers and the
additional symbols shall be placed in vertical columns to the right of the symbol prescribed in
paragraph 4.4.1 above.
4.6. The approval mark shall be clearly legible and be indelible.
4.6.1. In the case of a vehicle, the approval mark shall be placed close to or on the vehicle data plate.
4.6.2. In the case of a hydrogen storage system, the approval mark shall be placed on the container.
4.6.3. In the case of a specific component, the approval mark shall be placed on the specific component.
(3) The distinguishing numbers of the Contracting Parties to the 1958 Agreement are reproduced in Annex 3 to the Consolidated
Resolution on the Construction of Vehicles (R.E.3), document ECE/TRANS/WP.29/78/Rev. 3, Annex 3 — www.unece.
org/trans/main/wp29/wp29wgs/wp29gen/wp29resolutions.htmlL 129/48 EN Official Journal of the European Union 17.5.2019
5. PART I — SPECIFICATIONS OF THE COMPRESSED HYDROGEN STORAGE SYSTEM
This part specifies the requirements for the compressed hydrogen storage system. The hydrogen storage
system consists of the high pressure storage container and primary closure devices for openings into the high
pressure storage container. Figure 1 shows a typical compressed hydrogen storage system consisting of
a pressurised container, three closure devices and their fittings. The closure devices shall include the following
functions, which may be combined:
(a) TPRD;
(b) Check valve that prevents reverse flow to the fill line; and
(c) Automatic shut-off valve that can close to prevent flow from the container to the fuel cell or internal
combustion engine. Any shut-off valve, and TPRD that form the primary closure of flow from the storage
container shall be mounted directly on or within each container. At least one component with a check
valve function shall be mounted directly on or within each container.
Figure 1
Typical compressed hydrogen storage system
All new compressed hydrogen storage systems produced for on-road vehicle service shall have a NWP of
70 MPa or less and a service life of 15 years or less, and be capable of satisfying the requirements of
paragraph 5.
The hydrogen storage system shall meet the performance test requirements specified in this paragraph. The
qualification requirements for on-road service are:
5.1. Verification tests for baseline metrics
5.2. Verification test for performance durability (hydraulic sequential tests)
5.3. Verification test for expected on-road system performance (pneumatic sequential tests)
5.4. Verification test for service terminating system performance in Fire
5.5. Verification test for performance durability of primary closures.
The test elements within these performance requirements are summarised in the table below. The
corresponding test procedures are specified in Annex 3.
Overview of performance requirements
5.1. Verification tests for baseline metrics
5.1.1. Baseline initial burst pressure
5.1.2. Baseline initial pressure cycle life17.5.2019 EN Official Journal of the European Union L 129/49
5.2. Verification test for performance durability (sequential hydraulic tests)
5.2.1. Proof pressure test
5.2.2. Drop (impact) test
5.2.3. Surface damage
5.2.4. Chemical exposure and ambient temperature pressure cycling tests
5.2.5. High temperature static pressure test
5.2.6. Extreme temperature pressure cycling
5.2.7. Residual proof pressure test
5.2.8. Residual strength burst test
5.3. Verification test for expected on-road performance (sequential pneumatic tests)
5.3.1. Proof pressure test
5.3.2. Ambient and extreme temperature gas pressure cycling test (pneumatic)
5.3.3. Extreme temperature static gas pressure leak/permeation test (pneumatic)
5.3.4. Residual proof pressure test
5.3.5. Residual strength burst test (hydraulic)
5.4. Verification test for service terminating performance in fire
5.5. Requirements for primary closure devices
5.1. Verification tests for baseline metrics
5.1.1. Baseline initial burst pressure
Three (3) containers shall be hydraulically pressurised until burst (Annex 3, paragraph 2.1 test procedure).
The manufacturer shall supply documentation (measurements and statistical analyses) that establish the
midpoint burst pressure of new storage containers, BP .
O
All containers tested shall have a burst pressure within ± 10 per cent of BP and greater than or equal to
O
a minimum BPmin of 225 per cent NWP.
In addition, containers having glass-fibre composite as a primary constituent to have a minimum burst
pressure greater than 350 per cent NWP.
5.1.2. Baseline initial pressure cycle life
Three (3) containers shall be hydraulically pressure cycled at the ambient temperature of 20 (± 5) °C to
125 per cent NWP (+ 2/– 0 MPa) without rupture for 22 000 cycles or until a leak occurs (Annex 3,
paragraph 2.2 test procedure). Leakage shall not occur within 11 000 cycles for a 15-year service life.
5.2. Verification tests for performance durability (Hydraulic sequential tests)
If all three pressure cycle life measurements made in paragraph 5.1.2 are greater than 11 000 cycles, or if
they are all within ± 25 per cent of each other, then only one (1) container is tested in paragraph 5.2.
Otherwise, three (3) containers are tested in paragraph 5.2.
A hydrogen storage container shall not leak during the following sequence of tests, which are applied in
series to a single system and which are illustrated in Figure 2. Specifics of applicable test procedures for the
hydrogen storage system are provided in Annex 3, paragraph 3.L 129/50 EN Official Journal of the European Union 17.5.2019
Figure 2
Verification test for performance durability (hydraulic)
5.2.1. Proof pressure test
A storage container is pressurised to 150 per cent NWP (+ 2/– 0 MPa) and held for at least 30 sec (Annex 3,
paragraph 3.1 test procedure).
5.2.2. Drop (impact) test
The storage container is dropped at several impact angles (Annex 3, paragraph 3.2 test procedure).
5.2.3. Surface damage test
The storage container is subjected to surface damage (Annex 3, paragraph 3.3 test procedure).
5.2.4. Chemical exposure and ambient-temperature pressure cycling test
The storage container is exposed to chemicals found in the on-road environment and pressure cycled to
125 per cent NWP (+ 2/– 0 MPa) at 20 (± 5) °C for 60 per cent number of Cycles pressure cycles (Annex 3,
paragraph 3.4 test procedure). Chemical exposure is discontinued before the last 10 cycles, which are
conducted to 150 per cent NWP (+ 2/– 0 MPa).
5.2.5. High temperature static pressure test.
The storage container is pressurised to 125 per cent NWP (+ 2/– 0 MPa) at ≥ 85 °C for at least 1 000 hours
(Annex 3, paragraph 3.5 test procedure).
5.2.6. Extreme temperature pressure cycling.
The storage container is pressure cycled at ≤ – 40 °C to 80 per cent NWP (+ 2/– 0 MPa) for 20 per
cent number of Cycles and at ≥ + 85 °C and 95 (± 2) per cent relative humidity to 125 per cent NWP
(+ 2/– 0 MPa) for 20 per cent number of Cycles (Annex 3, paragraph 2.2 test procedure).17.5.2019 EN Official Journal of the European Union L 129/51
5.2.7. Hydraulic residual pressure test. The storage container is pressurised to 180 per cent NWP (+ 2/– 0 MPa) and
held at least 4 minutes without burst (Annex 3, paragraph 3.1 test procedure).
5.2.8. Residual strength burst test
The storage container undergoes a hydraulic burst test to verify that the burst pressure is at least 80 per cent
of the baseline initial burst pressure (BP ) determined in paragraph 5.1.1 (Annex 3, paragraph 2.1 test
O
procedure).
5.3. Verification test for expected on-road performance (Pneumatic sequential tests)
A hydrogen storage system shall not leak during the following sequence of tests, which are illustrated in
Figure 3. Specifics of applicable test procedures for the hydrogen storage system are provided in Annex 3.
Figure 3
Verification test for expected on-road performance (pneumatic/hydraulic)
5.3.1. Proof pressure test
A system is pressurised to 150 per cent NWP (+ 2/– 0 MPa) for at least 30 seconds (Annex 3, paragraph 3.1
test procedure). A storage container that has undergone a proof pressure test in manufacture may be
exempted from this test.
5.3.2. Ambient and extreme temperature gas pressure cycling test
The system is pressure cycled using hydrogen gas for 500 cycles (Annex 3, paragraph 4.1 test procedure).
(a) The pressure cycles are divided into two groups: Half of the cycles (250) are performed before exposure
to static pressure (paragraph 5.3.3) and the remaining half of the cycles (250) are performed after the
initial exposure to static pressure (paragraph 5.3.3) as illustrated in Figure 3;L 129/52 EN Official Journal of the European Union 17.5.2019
(b) The first group of pressure cycling, 25 cycles are performed to 80 per cent NWP (+ 2/– 0 MPa) at
≤ – 40 °C, then 25 cycles to 125 per cent NWP (+ 2/– 0 MPa) at ≥ + 50 °C and 95 (± 2) per cent relative
humidity, and the remaining 200 cycles to 125 per cent NWP (+ 2/– 0 MPa) at 20 (± 5) °C;
The second group of pressure cycling, 25 cycles are performed to 125 per cent NWP (+ 2/– 0 MPa) at
≥ + 50 °C and 95 (± 2) per cent relative humidity, then 25 cycles to 80 per cent NWP (+ 2/– 0 MPa) at
≤ – 40 °C, and the remaining 200 cycles to 125 per cent NWP (+ 2/– 0 MPa) at 20 (± 5) °C.
(c) The hydrogen gas fuel temperature is ≤ – 40 °C;
(d) During the first group of 250 pressure cycles, five cycles are performed with fuel having a temperature of
+ 20 (± 5) °C after temperature equilibration of the system at ≤ – 40 °C; five cycles are performed with
fuel having a temperature of ≤ – 40 °C; and five cycles are performed with fuel having a temperature of
≤ – 40 °C after temperature equilibration of the system at ≥ + 50 °C and 95 per cent relative humidity;
(e) Fifty pressure cycles are performed using a de-fuelling rate greater than or equal to the maintenance de-
fuelling rate.
5.3.3. Extreme temperature static pressure leak/permeation test.
(a) The test is performed after each group of 250 pneumatic pressure cycles in paragraph 5.3.2;
(b) The maximum allowable hydrogen discharge from the compressed hydrogen storage system is 46 ml/hr/l
water capacity of the storage system. (Annex 3, paragraph 4.2 test procedure);
(c) If the measured permeation rate is greater than 0,005 mg/sec (3,6 Nml/min), a localised leak test is
performed to ensure no point of localised external leakage is greater than 0,005 mg/sec (3,6 Nml/min)
(Annex 3, paragraph 4.3 test procedure).
5.3.4. Residual proof pressure test (hydraulic)
The storage container is pressurised to 180 per cent NWP (+ 2/– 0 MPa) and held at least 4 minutes without
burst (Annex 3, paragraph 3.1 test procedure).
5.3.5. Residual strength burst test (hydraulic)
The storage container undergoes a hydraulic burst to verify that the burst pressure is at least 80 per cent of
the baseline initial burst pressure (BP ) determined in paragraph 5.1.1 (Annex 3, paragraph 2.1 test
O
procedure).
5.4. Verification test for service terminating performance in fire
This section describes the fire test with compressed hydrogen as the test gas. Compressed air may be used as
an alternative test gas.
A hydrogen storage system is pressurised to NWP and exposed to fire (Annex 3, paragraph 5.1 test
procedure). A temperature-activated pressure relief device shall release the contained gases in a controlled
manner without rupture.
5.5. Requirements for primary closure devices
The primary closure devices that isolate the high pressure hydrogen storage system, namely TPRD, check
valve and shut-off valve, as described in Figure 1, shall be tested and type-approved in accordance with Part II
of this Regulation and produced in conformity with the approved type.
Retesting of the storage system is not required if alternative closure devices are provided having comparable
function, fittings, materials, strength and dimensions, and satisfy the condition above. However, a change in
TPRD hardware, its position of installation or venting lines shall require a new fire test in accordance with
paragraph 5.4.17.5.2019 EN Official Journal of the European Union L 129/53
5.6. Labelling
A label shall be permanently affixed on each container with at least the following information: name of the
manufacturer, serial number, date of manufacture, MFP, NWP, type of fuel (e.g. ‘CHG’ for gaseous hydrogen),
and date of removal from service. Each container shall also be marked with the number of cycles used in the
testing programme as per paragraph 5.1.2. Any label affixed to the container in compliance with this
paragraph shall remain in place and be legible for the duration of the manufacturer's recommended service
life for the container.
Date of removal from service shall not be more than 15 years after the date of manufacture.
6. PART II — SPECIFICATIONS OF SPECIFIC COMPONENTS FOR THE COMPRESSED HYDROGEN STORAGE SYSTEM
6.1. TPRD requirements
TPRDs shall meet the following performance requirements:
(a) Pressure cycling test (Annex 4, paragraph 1.1);
(b) Accelerated life test (Annex 4, paragraph 1.2);
(c) Temperature cycling test (Annex 4, paragraph 1.3);
(d) Salt corrosion resistance test (Annex 4, paragraph 1.4);
(e) Vehicle environment test (Annex 4, paragraph 1.5);
(f) Stress corrosion cracking test (Annex 4, paragraph 1.6);
(g) Drop and vibration test (Annex 4, paragraph 1.7);
(h) Leak test (Annex 4, paragraph 1.8);
(i) Bench top activation test (Annex 4, paragraph 1.9);
(j) Flow rate test (Annex 4, paragraph 1.10).
6.2. Check valve and automatic shut-off valve requirements
Check valves and automatic shut-off valves shall meet the following performance requirements:
(a) Hydrostatic strength test (Annex 4, paragraph 2.1);
(b) Leak test (Annex 4, paragraph 2.2);
(c) Extreme temperature pressure cycling test (Annex 4, paragraph 2.3);
(d) Salt corrosion resistance test (Annex 4, paragraph 2.4);
(e) Vehicle environment test (Annex 4, paragraph 2.5);
(f) Atmospheric exposure test (Annex 4, paragraph 2.6);
(g) Electrical tests (Annex 4, paragraph 2.7);
(h) Vibration test (Annex 4, paragraph 2.8);
(i) Stress corrosion cracking test (Annex 4, paragraph 2.9);
(j) Pre-cooled hydrogen exposure test (Annex 4, paragraph 2.10).
6.3. At least the following information: MFP and type of fuel (e.g. ‘CHG’ for gaseous hydrogen), shall be marked
on each component having the function(s) of the primary closure devices in clearly legible and indelible
manner.L 129/54 EN Official Journal of the European Union 17.5.2019
7. PART III — SPECIFICATIONS OF A VEHICLE FUEL SYSTEM INCORPORATING THE COMPRESSED HYDROGEN
STORAGE SYSTEM
This part specifies requirements for the vehicle fuel system, which includes the compressed hydrogen storage
system, piping, joints, and components in which hydrogen is present. The hydrogen storage system included
in the vehicle fuel system shall be tested and type-approved in accordance with Part I of this Regulation and
produced in conformity with the approved type.
7.1. In-use fuel system requirements
7.1.1. Fuelling receptacle
7.1.1.1. A compressed hydrogen fuelling receptacle shall prevent reverse flow to the atmosphere. Test procedure is by
visual inspection.
7.1.1.2. Fuelling receptacle label: A label shall be affixed close to the fuelling receptacle; for instance inside a refilling
hatch, showing the following information: fuel type (e.g. ‘CHG’ for gaseous hydrogen), MFP, NWP, date of
removal from service of containers.
7.1.1.3. The fuelling receptacle shall be mounted on the vehicle to ensure positive locking of the fuelling nozzle. The
receptacle shall be protected from tampering and the ingress of dirt and water (e.g. installed in
a compartment which can be locked). Test procedure is by visual inspection.
7.1.1.4. The fuelling receptacle shall not be mounted within the external energy absorbing elements of the vehicle
(e.g. bumper) and shall not be installed in the passenger compartment, luggage compartment and other places
where hydrogen gas could accumulate and where ventilation is not sufficient. Test procedure is by visual
inspection.
7.1.2. Over-pressure protection for the low pressure system (Annex 5, paragraph 6 test procedure)
The hydrogen system downstream of a pressure regulator shall be protected against overpressure due to the
possible failure of the pressure regulator. The set pressure of the overpressure protection device shall be lower
than or equal to the maximum allowable working pressure for the appropriate section of the hydrogen
system.
7.1.3. Hydrogen discharge systems
7.1.3.1. Pressure relief systems (Annex 5, paragraph 6 test procedure)
(a) Storage system TPRDs. The outlet of the vent line, if present, for hydrogen gas discharge from TPRD(s) of
the storage system shall be protected by a cap;
(b) Storage system TPRDs. The hydrogen gas discharge from TPRD(s) of the storage system shall not be
directed:
(i) Into enclosed or semi-enclosed spaces;
(ii) Into or towards any vehicle wheel housing;
(iii) Towards hydrogen gas containers;
(iv) Forward from the vehicle, or horizontally (parallel to road) from the back or sides of the vehicle.
(c) Other pressure relief devices (such as a burst disc) may be used outside the hydrogen storage system. The
hydrogen gas discharge from other pressure relief devices shall not be directed:
(i) Towards exposed electrical terminals, exposed electrical switches or other ignition sources;
(ii) Into or towards the vehicle passenger or luggage compartments;
(iii) Into or towards any vehicle wheel housing;
(iv) Towards hydrogen gas containers.17.5.2019 EN Official Journal of the European Union L 129/55
7.1.3.2. Vehicle exhaust system (Annex 5, paragraph 4 test procedure)
At the vehicle exhaust system's point of discharge, the hydrogen concentration level shall:
(a) Not exceed 4 per cent average by volume during any moving three-second time interval during normal
operation including start-up and shut-down;
(b) And not exceed 8 per cent at any time (Annex 5, paragraph 4 test procedure).
7.1.4. Protection against flammable conditions: single failure conditions
7.1.4.1. Hydrogen leakage and/or permeation from the hydrogen storage system shall not directly vent into the
passenger or luggage compartments, or to any enclosed or semi-enclosed spaces within the vehicle that
contains unprotected ignition sources.
7.1.4.2. Any single failure downstream of the main hydrogen shut-off valve shall not result in accumulations in levels
of hydrogen concentration in the passenger compartment according to test procedure in Annex 5,
paragraph 3.2.
7.1.4.3. If, during operation, a single failure results in a hydrogen concentration exceeding 3,0 per cent by volume in
air in the enclosed or semi-enclosed spaces of the vehicle, then a warning shall be provided (paragraph 7.1.6).
If the hydrogen concentration exceeds 4,0 per cent by volume in the air in the enclosed or semi-enclosed
spaces of the vehicle, the main shut-off valve shall be closed to isolate the storage system. (Annex 5,
paragraph 3 test procedure).
7.1.5. Fuel system leakage
The hydrogen fuelling line (e.g. piping, joint, etc.) downstream of the main shut-off valve(s) to the fuel cell
system or the engine shall not leak. Compliance shall be verified at NWP (Annex 5, paragraph 5 test
procedure).
7.1.6. Tell-tale signal warning to driver
The warning shall be given by a visual signal or display text with the following properties:
(a) Visible to the driver while in the driver's designated seating position with the driver's seat belt fastened;
(b) Yellow in colour if the detection system malfunctions (e.g. circuit disconnection, short-circuit, sensor
fault). It shall be red in compliance with section paragraph 7.1.4.3;
(c) When illuminated, shall be visible to the driver under both daylight and night time driving conditions;
(d) Remains illuminated when 3,0 per cent concentration or detection system malfunction exists and the
ignition locking system is in the ‘On’ (‘Run’) position or the propulsion system is activated.
7.2. Post-crash fuel system integrity
The vehicle fuel system shall comply with the following requirements after the vehicle crash tests in
accordance with the following Regulations by also applying the test procedures prescribed in Annex 5 of this
Regulation.
(a) Frontal impact test in accordance with either Regulation No 12, or Regulation No 94; and
(b) Lateral impact test in accordance with Regulation No 95.
In case that one or both of the vehicle crash tests specified above are not applicable to the vehicle, the vehicle
fuel system shall, instead, be subject to the relevant alternative accelerations specified below and the hydrogen
storage system shall be installed in a position satisfying the requirements in paragraph 7.2.4. The accelerations
shall be measured at the location where the hydrogen storage system is installed. The vehicle fuel system shall
be mounted and fixed on the representative part of the vehicle. The mass used shall be representative for
a fully equipped and filled container or container assembly.L 129/56 EN Official Journal of the European Union 17.5.2019
Accelerations for vehicles of categories M and N :
1 1
(a) 20 g in the direction of travel (forward and rearward direction);
(b) 8 g horizontally perpendicular to the direction of travel (to left and right).
Accelerations for vehicles of categories M and N :
2 2
(a) 10 g in the direction of travel (forward and rearward direction);
(b) 5 g horizontally perpendicular to the direction of travel (to left and right).
Accelerations for vehicles of categories M and N :
3 3
(a) 6,6 g in the direction of travel (forward and rearward direction);
(b) 5 g horizontally perpendicular to the direction of travel (to left and right).
7.2.1. Fuel leakage limit
The volumetric flow of hydrogen gas leakage shall not exceed an average of 118 N per minute for the time
l
interval, Δt, as determined in accordance with Annex 5, paragraph 1.1 or 1.2.
7.2.2. Concentration limit in enclosed spaces
Hydrogen gas leakage shall not result in a hydrogen concentration in the air greater than 4,0 per cent by
volume in the passenger and luggage compartments (Annex 5, paragraph 2 test procedures). The requirement
is satisfied if it is confirmed that the shut-off valve of the storage system has closed within 5 seconds of the
crash and no leakage from the storage system.
7.2.3. Container Displacement
The storage container(s) shall remain attached to the vehicle at a minimum of one attachment point.
7.2.4. Additional installation requirements
7.2.4.1. Requirements on installation of the hydrogen storage system not subject to the frontal impact test:
The container shall be mounted in a position which is rearward of a vertical plane perpendicular to the
centre line of the vehicle and located 420 mm rearward from the front edge of the vehicle.
7.2.4.2. Requirements on installation of the hydrogen storage system not subject to the lateral impact test:
The container shall be mounted in a position which is between the two vertical planes parallel to the centre
line of the vehicle located 200 mm inside from the both outermost edge of the vehicle in the proximity of its
container(s).
8. MODIFICATION OF TYPE AND EXTENSION OF APPROVAL
8.1. Every modification to an existing type of vehicle or hydrogen storage system or specific component for
hydrogen storage system shall be notified to the Type Approval Authority which approved that type. The
Authority shall then either:
(a) Decide, in consultation with the manufacturer, that a new type-approval is to be granted; or
(b) Apply the procedure contained in paragraph 8.1.1 (Revision) and, if applicable, the procedure contained
in paragraph 8.1.2 (Extension).
8.1.1. Revision
When particulars recorded in the information documents of Annex 1 have changed and the Type Approval
Authority considers that the modifications made are unlikely to have an appreciable adverse effect and that in
any case the vehicle/hydrogen storage system/specific component still meets the requirements, the
modification shall be designated a ‘revision’.17.5.2019 EN Official Journal of the European Union L 129/57
In such a case, the Type Approval Authority shall issue the revised pages of the information documents of
Annex 1 as necessary, marking each revised page to show clearly the nature of the modification and the date
of re-issue. A consolidated, updated version of the information documents of Annex 1, accompanied by
a detailed description of the modification, shall be deemed to meet this requirement.
8.1.2. Extension
The modification shall be designated an ‘extension’ if, in addition to the change of the particulars recorded in
the information folder,
(a) Further inspections or tests are required; or
(b) Any information on the communication document (with the exception of its attachments) has changed;
or
(c) Approval to a later series of amendments is requested after its entry into force.
8.2. Confirmation or refusal of approval, specifying the alterations, shall be communicated by the procedure
specified in paragraph 4.3 above to the Contracting Parties to the Agreement which apply this Regulation. In
addition, the index to the information documents and to the test reports, attached to the communication
document of Annex 1, shall be amended accordingly to show the date of the most recent revision or
extension.
8.3. The Type Approval Authority issuing the extension of approval shall assign a serial number to each
communication form drawn up for such an extension.
9. CONFORMITY OF PRODUCTION
Procedures concerning conformity of production shall conform to the general provisions defined in
Appendix 2 to the Agreement (E/ECE/324-E/ECE/TRANS/505/Rev.2) and at least meet the following
requirements:
9.1. A vehicle, hydrogen storage system or component approved pursuant to this Regulation shall be so
manufactured as to conform to the type approved by meeting the respective requirements of paragraphs 5
to 7 above;
9.2. The Type Approval Authority which has granted approval may at any time verify the conformity of control
methods applicable to each production unit. The normal frequency of such inspections shall be once every
two years.
9.3. In case of compressed hydrogen storage system, the production control of the container shall satisfy the
following additional requirements;
9.3.1. Every container shall be tested in accordance with paragraph 5.2.1 of this Regulation. The test pressure is
≥ 150 per cent of NWP.
9.3.2. Batch testing
In any case, for each batch, which is not permitted to exceed 200 finished cylinders or liners (not including
destructive test cylinders or liners), or one shift of successive production, whichever is greater, at least one
container shall be subjected to the rupture test in paragraph 9.3.2.1 and furthermore at least one container
shall be subjected to the pressure cycle test in paragraph 9.3.2.2.
9.3.2.1. Rupture test in batch testing
The test shall be performed according to paragraph 2.1 (hydrostatic pressure rupture test) of Annex 3. The
required rupture pressure shall be at least BPmin and the average burst pressure recorded of the last 10 tests
shall be at or above BP -10 per cent.
O
9.3.2.2. Ambient temperature pressure cycling test in batch testing
The test shall be performed according to paragraph 2.2(a) to (c) (hydrostatic pressure cycling test) of Annex 3,
except that the temperature requirements for the fuelling fluid and the container skin, and the relative
humidity requirement, do not apply. The cylinder shall be pressure cycled using hydrostatic pressures
≥ 125 per cent of NWP, to 22 000 cycles in case of no leakage or until leakage occurs. For the service life of
15 years, the cylinder shall not leak or rupture within the first 11 000 cycles.L 129/58 EN Official Journal of the European Union 17.5.2019
9.3.2.3. Relaxation provisions
In the ambient temperature pressure cycling test in batch testing, finished cylinders shall be pressure cycled at
a sampling frequency defined as follows:
9.3.2.3.1. One cylinder from each batch shall be pressure cycled with 11 000 cycles for the service life of 15 years.
9.3.2.3.2. On 10 sequential production batches of the same design, should none of the pressure cycled cylinders leak or
rupture in less than 11 000 cycles × 1,5 for the service life of 15 years, then the pressure cycling test can be
reduced to one cylinder from every 5 batches of production.
9.3.2.3.3. On 10 sequential production batches of the same design, should none of the pressure cycled cylinders leak or
rupture in less than 11 000 cycles × 2,0 for the service life of 15 years, then the pressure cycling test can be
reduced to one cylinder from every 10 batches of production.
9.3.2.3.4. Should more than 6 months have expired since the last batch of production, then the sampling frequency for
the next batch of production shall be that specified in paragraph 9.3.2.3.2 or 9.3.2.3.3 above.
9.3.2.3.5. Should any cylinder tested at the sampling frequency in paragraph 9.3.2.3.2 or 9.3.2.3.3 above fail to meet
the required number of pressure cycles, then it shall be necessary to repeat the pressure cycling test at the
sampling frequency in paragraph 9.3.2.3.1 above for a minimum 10 production batches. The sampling
frequency for testing thereafter shall be that specified in paragraph 9.3.2.3.2 or 9.3.2.3.3 above.
9.3.2.3.6. Should any cylinder tested at the sampling frequency in paragraph 9.3.2.3.1, 9.3.2.3.2 or 9.3.2.3.3 above fail
to meet the minimum requirement regarding the number of pressure cycles (11 000 cycles), then the cause of
failure shall be determined and corrected following the procedures in paragraph 9.3.2.3.7.
The pressure cycling test shall then be repeated on an additional three cylinders from that batch. Should any
of the three additional cylinders fail to meet the minimum requirement regarding the number of pressure
cycles (11 000 cycles), then all cylinders of this batch shall be rejected.
9.3.2.3.7. In the event of failure to meet test requirements retesting or reheat treatment and retesting shall be carried
out as follows:
(a) If there is evidence of a fault in carrying out a test, or an error of measurement, a further test shall be
performed. If the result of this test is satisfactory, the first test shall be ignored;
(b) If the test has been carried out in a satisfactory manner, the cause of test failure shall be identified.
All cylinders that fail to meet the requirements shall be rejected or repaired by an approved method. The
non-rejected cylinders are then considered as a new batch.
In any case, the new batch shall be retested. All the relevant prototype or batch tests needed to prove the
acceptability of the new batch shall be performed again. If any cylinder in a batch is proven unsatisfactory by
one or more tests, all cylinders of this batch shall be rejected.
10. PENALTIES FOR NON-CONFORMITY OF PRODUCTION
10.1. The approval granted in respect of a vehicle, system or component type pursuant to this Regulation may be
withdrawn if the requirements laid down in paragraph 9 above are not complied with.
10.2. If a Contracting Party withdraws an approval it had previously granted, it shall forthwith so notify the other
Contracting Parties applying this Regulation by sending them a communication form conforming to the
model set out in Part 2 of Annex 1 to this Regulation.
11. PRODUCTION DEFINITIVELY DISCONTINUED
If the holder of the approval completely ceases to manufacture a type of vehicle, system or component
approved in accordance with this Regulation, he shall so inform the authority which granted the approval,
which in turn shall forthwith inform the other Contracting Parties to the Agreement applying this Regulation
by means of a communication form conforming to the model set out in Part 2 of Annex 1 to this Regulation.17.5.2019 EN Official Journal of the European Union L 129/59
12. NAMES AND ADDRESSES OF TECHNICAL SERVICES RESPONSIBLE FOR CONDUCTING APPROVAL TESTS AND OF
THE TYPE APPROVAL AUTHORITIES
The Contracting Parties to the Agreement applying this Regulation shall communicate to the United Nations
secretariat the names and addresses of the Technical Services responsible for conducting approval tests and of
the Type Approval Authorities which grant approval and to which forms certifying approval or extension or
refusal or withdrawal of approval are to be sent.L 129/60 EN Official Journal of the European Union 17.5.2019
ANNEX 1
PART 1
Model — I
Information document No … on the type approval of a hydrogen storage system with regard to the safety-related
performance of hydrogen-fuelled vehicles
The following information, if applicable, shall include a list of contents. Any drawings shall be supplied in appropriate
scale and in sufficient detail on size A4 or on a folder of A4 format. Photographs, if any, shall show sufficient details.
If the systems or components have electronic controls, information concerning their performance shall be supplied.
0. General
0.1. Make (trade name of manufacturer): ............................................................................................................
0.2. Type: ..........................................................................................................................................................
0.2.1. Commercial name(s) (if available): ................................................................................................................
0.5. Name and address of manufacturer: .............................................................................................................
0.8. Name(s) and address(es) of assembly plant(s): ...............................................................................................
0.9. Name and address of the manufacturer's representative (if any): ....................................................................
3. Power Plant
3.9. Hydrogen storage system
3.9.1. Hydrogen storage system designed to use liquid/compressed (gaseous) hydrogen (1)
3.9.1.1. Description and drawing of the hydrogen storage system: .............................................................................
3.9.1.2. Make(s): .....................................................................................................................................................
3.9.1.3. Type(s): ......................................................................................................................................................
3.9.2. Container(s)
3.9.2.1. Make(s): .....................................................................................................................................................
3.9.2.2. Type(s): ......................................................................................................................................................
3.9.2.3. Maximum Allowable Working Pressure (MAWP): ................................................................................... MPa
3.9.2.4. Nominal working pressure(s): ............................................................................................................... MPa
3.9.2.5. Number of filling cycles: .............................................................................................................................
3.9.2.6. Capacity: ................................................................................................................................. litres (water)
3.9.2.7. Material: .....................................................................................................................................................
3.9.2.8. Description and drawing: ............................................................................................................................
3.9.3. Thermally-activated pressure relief device(s)
3.9.3.1. Make(s): .....................................................................................................................................................
3.9.3.2. Type(s): ......................................................................................................................................................
(1) Delete where not applicable (there are cases where nothing needs to be deleted when more than one entry is applicable).17.5.2019 EN Official Journal of the European Union L 129/61
3.9.3.3. Maximum Allowable Working Pressure (MAWP): ................................................................................... MPa
3.9.3.4. Set pressure: ...............................................................................................................................................
3.9.3.5. Set temperature: .........................................................................................................................................
3.9.3.6. Blow off capacity: .......................................................................................................................................
3.9.3.7. Normal maximum operating temperature: ............................................................................................... °C
3.9.3.8. Nominal working pressure(s): ............................................................................................................... MPa
3.9.3.9. Material: .....................................................................................................................................................
3.9.3.10. Description and drawing: ............................................................................................................................
3.9.3.11. Approval number: ......................................................................................................................................
3.9.4. Check valve(s)
3.9.4.1. Make(s): .....................................................................................................................................................
3.9.4.2. Type(s): ......................................................................................................................................................
3.9.4.3. Maximum Allowable Working Pressure (MAWP): ................................................................................... MPa
3.9.4.4. Nominal working pressure(s): ............................................................................................................... MPa
3.9.4.5. Material: .....................................................................................................................................................
3.9.4.6. Description and drawing: ............................................................................................................................
3.9.4.7. Approval number: ......................................................................................................................................
3.9.5. Automatic shut-off valve(s)
3.9.5.1. Make(s): .....................................................................................................................................................
3.9.5.2. Type(s): ......................................................................................................................................................
3.9.5.3. Maximum Allowable Working Pressure (MAWP): ................................................................................... MPa
3.9.5.4. Nominal working pressure(s) and if downstream of the first pressure regulator, maximum allowable working
pressure(s): .......................................................................................................................................... MPa
3.9.5.5. Material: .....................................................................................................................................................
3.9.5.6. Description and drawing: ............................................................................................................................
3.9.5.7. Approval number: ......................................................................................................................................
Model — II
Information document No … on the type approval of specific component for a hydrogen storage system with regard to
the safety-related performance of hydrogen-fuelled vehicles
The following information, if applicable, shall include a list of contents. Any drawings shall be supplied in appropriate
scale and in sufficient detail on size A4 or on a folder of A4 format. Photographs, if any, shall show sufficient details.
If the components have electronic controls, information concerning their performance shall be supplied.
0. General
0.1. Make (trade name of manufacturer): ............................................................................................................L 129/62 EN Official Journal of the European Union 17.5.2019
0.2. Type: ..........................................................................................................................................................
0.2.1. Commercial name(s) (if available): ................................................................................................................
0.5. Name and address of manufacturer: .............................................................................................................
0.8. Name(s) and address(es) of assembly plant(s): ...............................................................................................
0.9. Name and address of the manufacturer's representative (if any): ....................................................................
3. Power Plant
3.9.3. Thermally-activated pressure relief device(s)
3.9.3.1. Make(s): .....................................................................................................................................................
3.9.3.2. Type(s): ......................................................................................................................................................
3.9.3.3. Maximum Allowable Working Pressure (MAWP): ................................................................................... MPa
3.9.3.4. Set pressure: ...............................................................................................................................................
3.9.3.5. Set temperature: .........................................................................................................................................
3.9.3.6. Blow off capacity: .......................................................................................................................................
3.9.3.7. Normal maximum operating temperature: ............................................................................................... °C
3.9.3.8. Nominal working pressure(s): ............................................................................................................... MPa
3.9.3.9. Material: .....................................................................................................................................................
3.9.3.10. Description and drawing: ............................................................................................................................
3.9.4. Check valve(s)
3.9.4.1. Make(s): .....................................................................................................................................................
3.9.4.2. Type(s): ......................................................................................................................................................
3.9.4.3. Maximum Allowable Working Pressure (MAWP): ....................................................................................MPa
3.9.4.4. Nominal working pressure(s): ............................................................................................................... MPa
3.9.4.5. Material: .....................................................................................................................................................
3.9.4.6. Description and drawing: ............................................................................................................................
3.9.5. Automatic shut-off valve(s)
3.9.5.1. Make(s): .....................................................................................................................................................
3.9.5.2. Type(s): ......................................................................................................................................................
3.9.5.3. Maximum Allowable Working Pressure (MAWP): ................................................................................... MPa
3.9.5.4. Nominal working pressure(s) and if downstream of the first pressure regulator, maximum allowable working
pressure(s): ......................................................................................................................................... MPa:
3.9.5.5. Material: .....................................................................................................................................................
3.9.5.6. Description and drawing: ............................................................................................................................17.5.2019 EN Official Journal of the European Union L 129/63
Model — III
Information document No … on the type approval of a vehicle with regard to the safety-related performance of
hydrogen-fuelled vehicles
The following information, if applicable, shall include a list of contents. Any drawings shall be supplied in appropriate
scale and in sufficient detail on size A4 or on a folder of A4 format. Photographs, if any, shall show sufficient details.
If the systems or components have electronic controls, information concerning their performance shall be supplied.
0. General
0.1. Make (trade name of manufacturer): ..............................................................................................................
0.2. Type:
0.2.1. Commercial name(s) (if available):
0.3. Means of identification of type, if marked on the vehicle (2): ...........................................................................
0.3.1. Location of that marking: ..............................................................................................................................
0.4. Category of vehicle (3): ..................................................................................................................................
0.5. Name and address of manufacturer: ...............................................................................................................
0.8. Name(s) and address(es) of assembly plant(s): .................................................................................................
0.9. Name and address of the manufacturer's representative (if any): ......................................................................
1. General construction characteristics of the vehicle
1.1. Photographs and/or drawings of a representative vehicle: ................................................................................
1.3.3. Powered axles (number, position, interconnection): .........................................................................................
1.4. Chassis (if any) (overall drawing): ...................................................................................................................
3. Power Plant
3.9. Hydrogen storage system
3.9.1. Hydrogen storage system designed to use liquid/compressed (gaseous) hydrogen (4)
3.9.1.1. Description and drawing of the hydrogen storage system: ...............................................................................
3.9.1.2. Make(s): .......................................................................................................................................................
3.9.1.3. Type(s): ........................................................................................................................................................
3.9.1.4. Approval Number: ........................................................................................................................................
3.9.6. Hydrogen leakage detection sensors: ..............................................................................................................
3.9.6.1. Make(s): .......................................................................................................................................................
3.9.6.2. Type(s): ........................................................................................................................................................
3.9.7. Refuelling connection or receptacle
3.9.7.1. Make(s): .......................................................................................................................................................
3.9.7.2. Type(s): ........................................................................................................................................................
3.9.8. Drawings showing requirements for installation and operation.
(2) If means of identification of type contains characters not relevant to describe the vehicle type covered by this information document,
such characters shall be represented in the documentation by the symbol ‘[..]’ (e.g. […]).
(3) As defined in the Consolidated Resolution on the Construction of Vehicles (R.E.3.), document ECE/TRANS/WP.29/78/Rev.3, para. 2 —
www.unece.org/trans/main/wp29/wp29wgs/wp29gen/wp29resolutions.html
(4) Delete where not applicable (there are cases where nothing needs to be deleted when more than one entry is applicable).L 129/64 EN Official Journal of the European Union 17.5.2019
PART 2
Model I17.5.2019 EN Official Journal of the European Union L 129/65
Model IIL 129/66 EN Official Journal of the European Union 17.5.2019
Model III17.5.2019 EN Official Journal of the European Union L 129/67
ANNEX 2
ARRANGEMENTS OF THE APPROVAL MARKS
MODEL A
(See paragraphs 4.4 to 4.4.2 of this Regulation)
a = 8 mm min.
The above approval mark affixed to a vehicle/ storage system/specific component shows that the vehicle/storage
system/specific component type concerned has been approved in Belgium (E 6) for its the safety-related performance of
hydrogen-fuelled vehicles pursuant to Regulation No 134. The first two digits of the approval number indicate that the
approval was granted in accordance with the requirements of Regulation No 134 in its original form.
MODEL B
(See paragraph 4.5 of this Regulation)
a = 8 mm min.
The above approval mark affixed to a vehicle shows that the road vehicle concerned has been approved in the
Netherlands (E 4) pursuant to Regulations Nos 134 and 100 (*). The approval number indicates that, at the dates when
the respective approvals were granted, Regulation No 100 was amended by the 02 series of amendments and Regulation
No 134 was still in its original form.
(*) The latter number is given only as an example.L 129/68 EN Official Journal of the European Union 17.5.2019
ANNEX 3
TEST PROCEDURES FOR THE COMPRESSED HYDROGEN STORAGE SYSTEM
1. TEST PROCEDURES FOR QUALIFICATION REQUIREMENTS OF COMPRESSED HYDROGEN STORAGE ARE ORGANISED AS
FOLLOWS:
Paragraph 2 of this Annex is the test procedures for baseline performance metrics (requirement of paragraph 5.1
of this Regulation)
Paragraph 3 of this Annex is the test procedures for performance durability (requirement of paragraph 5.2 of this
Regulation)
Paragraph 4 of this Annex is the test procedures for expected on-road performance (requirement of
paragraph 5.3 of this Regulation)
Paragraph 5 of this Annex is the test procedures for service terminating performance in fire (requirement of
paragraph 5.4 of this Regulation)
Paragraph 6 of this Annex is the test procedures for performance durability of primary closures (requirement of
paragraph 5.5 of this Regulation)
2. TEST PROCEDURES FOR BASELINE PERFORMANCE METRICS (REQUIREMENT OF PARAGRAPH 5. 1 OF THIS
REGULATION)
2.1. Burst test (hydraulic)
The burst test is conducted at the ambient temperature of 20 (± 5) °C using a non-corrosive fluid.
2.2. Pressure cycling test (hydraulic)
The test is performed in accordance with the following procedure:
(a) The container is filled with a non-corrosive fluid;
(b) The container and fluid are stabilised at the specified temperature and relative humidity at the start of testing;
the environment, fuelling fluid and container skin are maintained at the specified temperature for the
duration of the testing. The container temperature may vary from the environmental temperature during
testing;
(c) The container is pressure cycled between 2 (± 1) MPa and the target pressure at a rate not exceeding
10 cycles per minute for the specified number of cycles;
(d) The temperature of the hydraulic fluid within the container is maintained and monitored at the specified
temperature.
3. TEST PROCEDURES FOR PERFORMANCE DURABILITY (REQUIREMENT OF PARAGRAPH 5.2 OF THIS REGULATION)
3.1. Proof pressure test
The system is pressurised smoothly and continually with a non-corrosive hydraulic fluid until the target test
pressure level is reached and then held for the specified time.
3.2. Drop (impact) test (unpressurised)
The storage container is drop tested at ambient temperature without internal pressurisation or attached
valves. The surface onto which the containers are dropped shall be a smooth, horizontal concrete pad or other
flooring type with equivalent hardness.17.5.2019 EN Official Journal of the European Union L 129/69
The orientation of the container being dropped (in accordance with the requirement of paragraph 5.2.2) is
determined as follows: One or more additional container(s) shall be dropped in each of the orientations described
below. The drop orientations may be executed with a single container or as many as four containers may be used
to accomplish the four drop orientations.
(i) Dropped once from a horizontal position with the bottom 1,8 m above the surface onto which it is
dropped;
(ii) Dropped once onto the end of the container from a vertical position with the ported end upward with
a potential energy of not less than 488 J, with the height of the lower end no greater than 1,8 m;
(iii) Dropped once onto the end of the container from a vertical position with the ported end downward with
a potential energy of not less than 488 J, with the height of the lower end no greater than 1,8 m. If the
container is symmetrical (identical ported ends), this drop orientation is not required;
(iv) Dropped once at a 45° angle from the vertical orientation with a ported end downward with its centre of
gravity 1,8 m above the ground. However, if the bottom is closer to the ground than 0,6 m, the drop angle
shall be changed to maintain a minimum height of 0,6 m and a centre of gravity of 1,8 m above the ground.
The four drop orientations are illustrated in Figure 1.
Figure 1
Drop orientations
No attempt shall be made to prevent the bouncing of containers, but the containers may be prevented from
falling over during the vertical drop tests described above.
If more than one container is used to execute all drop specifications, then those containers shall undergo pressure
cycling according to Annex 3, paragraph 2.2 until either leakage or 22 000 cycles without leakage have occurred.
Leakage shall not occur within 11 000 cycles.
The orientation of the container being dropped in accordance with the requirement of paragraph 5.2.2 shall be
identified as follows:
(a) If a single container was subjected to all four drop orientations, then the container being dropped in
accordance with the requirement of paragraph 5.2.2 shall be dropped in all four orientations;
(b) If more than one container is used to execute the four drop orientations, and if all containers reach
22 000 cycles without leakage, then the orientation of the container being dropped in accordance with the
requirement paragraph 5.2.2 is the 45° orientation (iv), and that container shall then undergo further testing
as specified in paragraph 5.2;L 129/70 EN Official Journal of the European Union 17.5.2019
(c) If more than one container is used to execute the four drop orientations and if any container does not reach
22 000 cycles without leakage, then the new container shall be subjected to the drop orientation(s) that
resulted in the lowest number of cycles to leakage and then will undergo further testing as specified in
paragraph 5.2.
3.3. Surface damage test (unpressurised)
The test proceeds in the following sequence:
(a) Surface flaw generation: Two longitudinal saw cuts are made on the bottom outer surface of the unpres
surised horizontal storage container along the cylindrical zone close to but not in the shoulder area. The first
cut is at least 1,25 mm deep and 25 mm long toward the valve end of the container. The second cut is at
least 0,75 mm deep and 200 mm long toward the end of the container opposite the valve;
(b) Pendulum impacts: The upper section of the horizontal storage container is divided into five distinct (not
overlapping) areas 100 mm in diameter each (see Figure 2). After 12 hours preconditioning at ≤ – 40 °C in
an environmental chamber, the centre of each of the five areas sustains the impact of a pendulum having
a pyramid with equilateral faces and square base, the summit and edges being rounded to a radius of 3 mm.
The centre of impact of the pendulum coincides with the centre of gravity of the pyramid. The energy of the
pendulum at the moment of impact with each of the five marked areas on the container is 30 J. The
container is secured in place during pendulum impacts and not under pressure.
Figure 2
Side view of container
3.4. Chemical exposure and ambient-temperature pressure cycling test
Each of the 5 areas of the unpressurised container preconditioned by pendulum impact (Annex 3, paragraph 3.3)
is exposed to one of five solutions:
(a) 19 per cent (by volume) sulphuric acid in water (battery acid);
(b) 25 per cent (by weight) sodium hydroxide in water;
(c) 5 per cent (by volume) methanol in gasoline (fluids in fuelling stations);
(d) 28 per cent (by weight) ammonium nitrate in water (urea solution); and
(e) 50 per cent (by volume) methyl alcohol in water (windshield washer fluid).
The test container is oriented with the fluid exposure areas on top. A pad of glass wool approximately 0,5 mm
thick and 100 mm in diameter is placed on each of the five preconditioned areas. A sufficient amount of the test
fluid is applied to the glass wool sufficient to ensure that the pad is wetted across its surface and through its
thickness for the duration of the test.
The exposure of the container with the glass wool is maintained for 48 hours with the container held at 125 per
cent NWP (+ 2/– 0 MPa) (applied hydraulically) and 20 (± 5) °C before the container is subjected to further
testing.17.5.2019 EN Official Journal of the European Union L 129/71
Pressure cycling is performed to the specified target pressures according to paragraph 2.2 of this Annex at
20 (± 5) °C for the specified numbers of cycles. The glass wool pads are removed and the container surface is
rinsed with water before the final 10 cycles to specified final target pressure are conducted.
3.5. Static pressure test (hydraulic)
The storage system is pressurised to the target pressure in a temperature-controlled chamber. The temperature of
the chamber and the non-corrosive fuelling fluid is held at the target temperature within ± 5 °C for the specified
duration.
4. TEST PROCEDURES FOR EXPECTED ON-ROAD PERFORMANCE (PARAGRAPH 5.3 OF THIS REGULATION)
(Pneumatic test procedures are provided; hydraulic test elements are described in Annex 3, paragraph 2.1)
4.1. Gas pressure cycling test (pneumatic)
At the onset of testing, the storage system is stabilised at the specified temperature, relative humidity and fuel
level for at least 24 hours. The specified temperature and relative humidity is maintained within the test
environment throughout the remainder of the test. (When required in the test specification, the system
temperature is stabilised at the external environmental temperature between pressure cycles.) The storage system
is pressure cycled between less than 2 (+ 0/– 1) MPa and the specified maximum pressure (± 1 MPa). If system
controls that are active in vehicle service prevent the pressure from dropping below a specified pressure, the test
cycles shall not go below that specified pressure. The fill rate is controlled to a constant 3-minute pressure ramp
rate, but with the fuel flow not to exceed 60 g/sec; the temperature of the hydrogen fuel dispensed to the
container is controlled to the specified temperature. However, the pressure ramp rate should be decreased if the
gas temperature in the container exceeds + 85 °C. The defuelling rate is controlled to greater than or equal to the
intended vehicle's maximum fuel-demand rate. The specified number of pressure cycles is conducted. If devices
and/or controls are used in the intended vehicle application to prevent an extreme internal temperature, the test
may be conducted with these devices and/or controls (or equivalent measures).
4.2. Gas permeation test (pneumatic)
A storage system is fully filled with hydrogen gas at 115 per cent NWP (+ 2/– 0 MPa) (full fill density equivalent
to 100 per cent NWP at + 15 °C is 113 per cent NWP at + 55 °C) and held at ≥ + 55 °C in a sealed container
until steady-state permeation or 30 hours, whichever is longer. The total steady-state discharge rate due to leakage
and permeation from the storage system is measured.
4.3. Localised gas leak test (pneumatic)
A bubble test may be used to fulfil this requirement. The following procedure is used when conducting the
bubble test:
(a) The exhaust of the shut-off valve (and other internal connections to hydrogen systems) shall be capped for
this test (as the test is focused on external leakage).
At the discretion of the tester, the test article may be immersed in the leak-test fluid or leak-test fluid applied
to the test article when resting in open air. Bubbles can vary greatly in size, depending on conditions. The
tester estimates the gas leakage based on the size and rate of bubble formation.
(b) Note: For a localised rate of 0,005 mg/sec (3,6 Nml/min), the resultant allowable rate of bubble generation is
about 2 030 bubbles per minute for a typical bubble size of 1,5 mm in diameter. Even if much larger bubbles
are formed, the leak should be readily detectable. For an unusually large bubble size of 6 mm in diameter, the
allowable bubble rate would be approximately 32 bubbles per minute.
5. TEST PROCEDURES FOR SERVICE TERMINATING PERFORMANCE IN FIRE (PARAGRAPH 5.4 OF THIS REGULATION)
5.1. Fire test
The hydrogen container assembly consists of the compressed hydrogen storage system with additional relevant
features, including the venting system (such as the vent line and vent line covering) and any shielding affixed
directly to the container (such as thermal wraps of the container(s) and/or coverings/barriers over the TPRD(s)).L 129/72 EN Official Journal of the European Union 17.5.2019
Either one of the following two methods are used to identify the position of the system over the initial (localised)
fire source:
(a) Method 1: Qualification for a generic (non-Specific) vehicle installation
If a vehicle installation configuration is not specified (and the type approval of the system is not limited to
a specific vehicle installation configuration) then the localised fire exposure area is the area on the test article
farthest from the TPRD(s). The test article, as specified above, only includes thermal shielding or other
mitigation devices affixed directly to the container that are used in all vehicle applications. Venting system(s)
(such as the vent line and vent line covering) and/or coverings/barriers over the TPRD(s) are included in the
container assembly if they are anticipated for use in any application. If a system is tested without representa
tive components, retesting of that system is required if a vehicle application specifies the use of these type of
components.
(b) Method 2: Qualification for a specific vehicle installation
If a specific vehicle installation configuration is specified and the type approval of the system is limited to
that specific vehicle installation configuration, then the test setup may also include other vehicle components
in addition to the hydrogen storage system. These vehicle components (such as shielding or barriers, which
are permanently attached to the vehicle's structure by means of welding or bolts and not affixed to the
storage system) shall be included in the test setup in the vehicle-installed configuration relative to the
hydrogen storage system. This localised fire test is conducted on the worst case localised fire exposure areas
based on the four fire orientations: fires originating from the direction of the passenger compartment,
luggage compartment, wheel wells or ground-pooled gasoline.
5.1.1. The container may be subjected to engulfing fire without any shielding components, as described in Annex 3,
paragraph 5.2.
5.1.2. The following test requirements apply whether Method 1 or 2 (above) is used:
(a) The container assembly is filled with compressed hydrogen gas at 100 per cent of NWP (+ 2/– 0 MPa). The
container assembly is positioned horizontally approximately 100 mm above the fire source;
(b) Localised portion of the fire test:
(i) The localised fire exposure area is located on the test article furthest from the TPRD(s). If Method 2 is
selected and more vulnerable areas are identified for a specific vehicle installation configuration, the more
vulnerable area that is furthest from the TPRD(s) is positioned directly over the initial fire source;
(ii) The fire source consists of LPG burners configured to produce a uniform minimum temperature on the
test article measured with a minimum 5 thermocouples covering the length of the test article up to
1,65 m maximum (at least 2 thermocouples within the localised fire exposure area, and at least 3 thermo
couples equally spaced and no more than 0,5 m apart in the remaining area) located 25 (± 10) mm from
the outside surface of the test article along its longitudinal axis. At the option of the manufacturer or
testing facility, additional thermocouples may be located at TPRD sensing points or any other locations
for optional diagnostic purposes;
(iii) Wind shields are applied to ensure uniform heating;
(iv) The fire source initiates within a 250 (± 50) mm longitudinal expanse positioned under the localised fire
exposure area of the test article. The width of the fire source encompasses the entire diameter (width) of
the storage system. If Method 2 is selected, the length and width shall be reduced, if necessary, to
account for vehicle-specific features;
(v) As shown in Figure 3 the temperature of the thermocouples in the localised fire exposure area has
increased continuously to at least 300 °C within 1 minute of ignition, to at least 600 °C within
3 minutes of ignition, and a temperature of at least 600 °C is maintained for the next 7 minutes. The
temperature in the localised fire exposure area shall not exceed 900 °C during this period. Compliance to
the thermal requirements begins 1 minute after entering the period with minimum and maximum limits
and is based on a 1-minute rolling average of each thermocouple in the region of interest. (Note: The
temperature outside the region of the initial fire source is not specified during these initial 10 minutes
from the time of ignition.).17.5.2019 EN Official Journal of the European Union L 129/73
Figure 3
Temperature profile of fire test
(c) Engulfing portion of the fire test
Within the next 2-minute interval, the temperature along the entire surface of the test article shall be
increased to at least 800 °C and the fire source is extended to produce a uniform temperature along the entire
length up to 1,65 m and the entire width of the test article (engulfing fire). The minimum temperature is held
at 800 °C, and the maximum temperature shall not exceed 1 100 °C. Compliance to thermal requirements
begins 1 minute after entering the period with constant minimum and maximum limits and is based on
a 1-minute rolling average of each thermocouple.
The test article is held at temperature (engulfing fire condition) until the system vents through the TPRD and
the pressure falls to less than 1 MPa. The venting shall be continuous (without interruption), and the storage
system shall not rupture. An additional release through leakage (not including release through the TPRD) that
results in a flame with length greater than 0,5 m beyond the perimeter of the applied flame shall not occur.
Summary of fire test protocol
Engulfing Fire Region
Localised Fire Region Time Period (Outside the Localised Fire
Region)
Action Ignite burners 0-1 minute No burner operation
Minimum temperature Not specified Not specified
Maximum temperature Less than 900 °C Not specified
Action Increase temperature and 1-3 minutes No burner operation
stabilise fire for start of
localised fire exposure
Minimum temperature Greater than 300 °C Not specified
Maximum temperature Less than 900 °C Not specifiedL 129/74 EN Official Journal of the European Union 17.5.2019
Engulfing Fire Region
Localised Fire Region Time Period (Outside the Localised Fire
Region)
Action Localised fire exposure 3-10 minutes No burner operation
continues
Minimum temperature 1-minute rolling average Not specified
greater than 600 °C
Maximum temperature 1-minute rolling average less Not specified
than 900 °C
Action Increase temperature 10-11 min Main burner ignited at
utes 10 minutes
Minimum Temperature 1-minute rolling average Not specified
greater than 600 °C
Maximum temperature 1-minute rolling average less Less than 1 100 °C
than 1 100 °C
Action Increase temperature and 11-12 min Increase temperature and
stabilise fire for start of utes stabilise fire for start of
engulfing fire exposure engulfing fire exposure
Minimum Temperature 1-minute rolling average Greater than 300 °C
greater than 600 °C
Maximum temperature 1 minute rolling average less Less than 1 100 °C
than 1 100 °C
Action Engulfing fire exposure 12 minutes Engulfing fire exposure
continues -end of test continues
Minimum Temperature 1-minute rolling average 1-minute rolling average
greater than 800 °C greater than 800 °C
Maximum temperature 1 minute rolling average less 1-minute rolling average less
than 1 100 °C than 1 100 °C
(d) Documenting results of the fire test
The arrangement of the fire is recorded in sufficient detail to ensure the rate of heat input to the test article is
reproducible. The results include the elapsed time from ignition of the fire to the start of venting through the
TPRD(s), and the maximum pressure and time of evacuation until a pressure of less than 1 MPa is reached.
Thermocouple temperatures and container pressure are recorded at intervals of every 10 sec or less during
the test. Any failure to maintain specified minimum temperature requirements based on the 1-minute rolling
averages invalidates the test result. Any failure to maintain specified maximum temperature requirements
based on the 1-minute rolling averages invalidates the test result only if the test article failed during the test.
5.2. Engulfing fire test:
The test unit is the compressed hydrogen storage system. The storage system is filled with compressed hydrogen
gas at 100 per cent NWP (+ 2/– 0 MPa). The container is positioned horizontally with the container bottom
approximately 100 mm above the fire source. Metallic shielding is used to prevent direct flame impingement on
container valves, fittings, and/or pressure relief devices. The metallic shielding is not in direct contact with the
specified fire protection system (pressure relief devices or container valve).
A uniform fire source of 1,65 m length provides direct flame impingement on the container surface across its
entire diameter. The test shall continue until the container fully vents (until the container pressure falls below
0,7 MPa). Any failure or inconsistency of the fire source during a test shall invalidate the result.17.5.2019 EN Official Journal of the European Union L 129/75
Flame temperatures shall be monitored by at least three thermocouples suspended in the flame approximately
25 mm below the bottom of the container. Thermocouples may be attached to steel cubes up to 25 mm on
a side. Thermocouple temperature and the container pressure shall be recorded every 30 seconds during the test.
Within five minutes after the fire is ignited, an average flame temperature of not less than 590 °C (as determined
by the average of the two thermocouples recording the highest temperatures over a 60 second interval) is
attained and maintained for the duration of the test.
If the container is less than 1,65 m in length, the centre of the container shall be positioned over the centre of
the fire source. If the container is greater than 1,65 m in length, then if the container is fitted with a pressure
relief device at one end, the fire source shall commence at the opposite end of the container. If the container is
greater than 1,65 m in length and is fitted with pressure relief devices at both ends, or at more than one location
along the length of the container, the centre of the fire source shall be centred midway between the pressure
relief devices that are separated by the greatest horizontal distance.
The container shall vent through a pressure relief device without bursting.L 129/76 EN Official Journal of the European Union 17.5.2019
ANNEX 4
TEST PROCEDURES FOR SPECIFIC COMPONENTS FOR THE COMPRESSED HYDROGEN STORAGE
SYSTEM
1. TPRD QUALIFICATION PERFORMANCE TESTS
Testing is performed with hydrogen gas having gas quality compliant with ISO 14687-2/SAE J2719. All tests are
performed at ambient temperature 20 (± 5) °C unless otherwise specified. The TPRD qualification performance
tests are specified as follows (see also Appendix 1):
1.1. Pressure cycling test.
Five TPRD units undergo 11 000 internal pressure cycles with hydrogen gas having gas quality compliant with
ISO 14687-2/SAE J2719. The first five pressure cycles are between 2 (± 1) MPa and 150 per cent NWP (± 1 MPa);
the remaining cycles are between 2 (± 1) MPa and 125 per cent NWP (± 1 MPa). The first 1,500 pressure cycles
are conducted at a TPRD temperature of 85 °C or higher. The remaining cycles are conducted at a TPRD
temperature of 55 (± 5) °C. The maximum pressure cycling rate is 10 cycles per minute. Following this test, the
pressure relief device shall comply the requirements of Leak test (Annex 4, paragraph 1.8), Flow rate test
(Annex 4, paragraph 1.10) and Bench top activation test (Annex 4 paragraph 1.9).
1.2. Accelerated life test.
Eight TPRD units undergo testing; three at the manufacturer's specified activation temperature, Tact, and five at an
accelerated life temperature, Tlife = 9,1 × Tact0,503. The TPRD is placed in an oven or liquid bath with the
temperature held constant (± 1 °C). The hydrogen gas pressure on the TPRD inlet is 125 per cent NWP (± 1 MPa).
The pressure supply may be located outside the controlled temperature oven or bath. Each device is pressured
individually or through a manifold system. If a manifold system is used, each pressure connection includes
a check valve to prevent pressure depletion of the system when one specimen fails. The three TPRDs tested at Tact
shall activate in less than 10 hours. The five TPRDs tested at Tlife shall not activate in less than 500 hours.
1.3. Temperature cycling test
(a) An unpressurised TPRD is placed in a liquid bath maintained at – 40 °C or lower at least two hours. The
TPRD is transferred to a liquid bath maintained at + 85 °C or higher within five minutes, and maintained at
that temperature at least two hours. The TPRD is transferred to a liquid bath maintained at – 40 °C or lower
within five minutes;
(b) Step (a) is repeated until 15 thermal cycles have been achieved;
(c) With the TPRD conditioned for a minimum of two hours in the – 40 °C or lower liquid bath, the internal
pressure of the TPRD is cycled with hydrogen gas between 2 MPa (+ 1/– 0 MPa) and 80 per cent NWP
(+ 2/– 0 MPa) for 100 cycles while the liquid bath is maintained at – 40 °C or lower;
(d) Following the thermal and pressure cycling, the pressure relief device shall comply with the requirements of
Leak test (Annex 4, paragraph 1.8), except that the Leak test shall be conducted at – 40 °C (+ 5/– 0 °C). After
the Leak test, the TPRD shall comply with the requirements of Bench top activation test (Annex 4,
paragraph 1.9) and then Flow rate test (Annex 4, paragraph 1.10).
1.4. Salt corrosion resistance test
Two TPRD units are tested. Any non-permanent outlet caps are removed. Each TPRD unit is installed in a test
fixture in accordance with the manufacturer's recommended procedure so that external exposure is consistent
with realistic installation. Each unit is exposed for 500 hours to a salt spray (fog) test as specified in ASTM B117
(Standard Practice for Operating Salt Spray (Fog) Apparatus) except that in the test of one unit, the pH of the salt
solution shall be adjusted to 4,0 ± 0,2 by the addition of sulphuric acid and nitric acid in a 2:1 ratio, and in the
test of the other unit, the pH of the salt solution shall be adjusted to 10,0 ± 0,2 by the addition of sodium
hydroxide. The temperature within the fog chamber is maintained at 30-35 °C).17.5.2019 EN Official Journal of the European Union L 129/77
Following these tests, each pressure relief device shall comply with the requirements of Leak test (Annex 3,
paragraph 6.1.8), Flow rate test (Annex 3, paragraph 6.1.10) and Bench top activation test (Annex 3,
paragraph 6.1.9).
1.5. Vehicle environment test
Resistance to degradation by external exposure to automotive fluids is determined by the following test:
(a) The inlet and outlet connections of the TPRD are connected or capped in accordance with the manufacturers
installation instructions. The external surfaces of the TPRD are exposed for 24 hours at 20 (± 5) °C to each of
the following fluids:
(i) Sulphuric acid (19 per cent solution by volume in water);
(ii) Sodium hydroxide (25 per cent solution by weight in water);
(iii) Ammonium nitrate (28 per cent by weight in water); and
(iv) Windshield washer fluid (50 per cent by volume methyl alcohol and water).
The fluids are replenished as needed to ensure complete exposure for the duration of the test. A distinct test is
performed with each of the fluids. One component may be used for exposure to all of the fluids in sequence.
(b) After exposure to each fluid, the component is wiped off and rinsed with water;
(c) The component shall not show signs of physical degradation that could impair the function of the
component, specifically: cracking, softening, or swelling. Cosmetic changes such as pitting or staining are not
failures. At the conclusion of all exposures, the unit(s) shall comply with the requirements of Leak test
(Annex 4, paragraph 1.8), Flow rate test (Annex 4, paragraph 1.10) and Bench top activation test (Annex 4,
paragraph 1.9).
1.6. Stress corrosion cracking test.
For TPRDs containing components made of a copper-based alloy (e.g. brass), one TPRD unit is tested. All copper
alloy components exposed to the atmosphere shall be degreased and then continuously exposed for 10 days to
a moist ammonia-air mixture maintained in a glass chamber having a glass cover.
Aqueous ammonia having a specific gravity of 0,94 is maintained at the bottom of the glass chamber below the
sample at a concentration of at least 20 ml per litre of chamber volume. The sample is positioned 35 (± 5) mm
above the aqueous ammonia solution and supported in an inert tray. The moist ammonia-air mixture is
maintained at atmospheric pressure at 35 (± 5) °C. Copper-based alloy components shall not exhibit cracking or
delaminating due to this test.
1.7. Drop and vibration test
(a) Six TPRD units are dropped from a height of 2 m at ambient temperature (20 ± 5 °C) onto a smooth concrete
surface. Each sample is allowed to bounce on the concrete surface after the initial impact. One unit is dropped
in six orientations (opposing directions of 3 orthogonal axes: vertical, lateral and longitudinal). If each of the
six dropped samples does not show visible exterior damage that indicates that the part is unsuitable for use, it
shall proceed to step (b);
(b) Each of the six TPRD units dropped in step (a) and one additional unit not subjected to a drop are mounted
in a test fixture in accordance with manufacturer's installation instructions and vibrated 30 minutes along
each of the three orthogonal axes (vertical, lateral and longitudinal) at the most severe resonant frequency for
each axis. The most severe resonant frequencies are determined using an acceleration of 1,5 g and sweeping
through a sinusoidal frequency range of 10 to 500 Hz within 10 minutes. The resonance frequency is
identified by a pronounced increase in vibration amplitude. If the resonance frequency is not found in this
range, the test shall be conducted at 40 Hz. Following this test, each sample shall not show visible exterior
damage that indicates that the part is unsuitable for use. It shall subsequently comply with the requirements of
Leak test (Annex 4, paragraph 1.8), Flow rate test (Annex 4, paragraph 1.10) and Bench top activation test
(Annex 4, paragraph 1.9).L 129/78 EN Official Journal of the European Union 17.5.2019
1.8. Leak test
A TPRD that has not undergone previous testing is tested at ambient, high and low temperatures without being
subjected to other design qualification tests. The unit is held for one hour at each temperature and test pressure
before testing. The three temperature test conditions are:
(a) Ambient temperature: condition the unit at 20 (± 5) °C; test at 5 per cent NWP (+ 0/– 2 MPa) and 150 per
cent NWP (+ 2/– 0 MPa);
(b) High temperature: condition the unit at 85 °C or higher; test at 5 per cent NWP (+ 0/– 2 MPa) and 150 per
cent NWP (+ 2/– 0 MPa);
(c) Low temperature: condition the unit at – 40 °C or lower; test at 5 per cent NWP (+ 0/– 2 MPa) and 100 per
cent NWP (+ 2/– 0 MPa).
Additional units undergo leak testing as specified in other tests in Annex 4, paragraph 1 with uninterrupted
exposure at the temperature specified in those tests.
At all specified test temperatures, the unit is conditioned for one minute by immersion in a temperature
controlled fluid (or equivalent method). If no bubbles are observed for the specified time period, the sample
passes the test. If bubbles are detected, the leak rate is measured by an appropriate method. The total hydrogen
leak rate shall be less than 10 Nml/hr.
1.9. Bench top activation test
Two new TPRD units are tested without being subjected to other design qualification tests in order to establish
a baseline time for activation. Additional pre-tested units (pre-tested according to Annex 4, paragraphs 1.1, 1.3,
1.4, 1.5 or 1.7) undergo bench top activation testing as specified in other tests in Annex 4, paragraph 1.
(a) The test setup consists of either an oven or chimney which is capable of controlling air temperature and flow
to achieve 600 (± 10) °C in the air surrounding the TPRD. The TPRD unit is not exposed directly to flame.
The TPRD unit is mounted in a fixture according to the manufacturer's installation instructions; the test con
figuration is to be documented;
(b) A thermocouple is placed in the oven or chimney to monitor the temperature. The temperature remains
within the acceptable range for two minutes prior to running the test;
(c) The pressurised TPRD unit is inserted into the oven or chimney, and the time for the device to activate is
recorded. Prior to insertion into the oven or chimney, one new (not pre-tested) TPRD unit is pressurised to no
more than 25 per cent NWP (the pre-tested); TPRD units are pressurised to no more than 25 per cent NWP;
and one new (not pre-tested) TPRD unit is pressurised to 100 per cent NWP;
(d) TPRD units previously subjected to other tests in Annex 4, paragraph 1 shall activate within a period no more
than two minutes longer than the baseline activation time of the new TPRD unit that was pressurised to up to
25 per cent NWP;
(e) The difference in the activation time of the two TPRD units that had not undergone previous testing shall be
no more than 2 minutes.
1.10. Flow rate test
(a) Eight TPRD units are tested for flow capacity. The eight units consist of three new TPRD units and one TPRD
unit from each of the following previous tests: Annex 4, paragraphs 1.1, 1.3, 1.4, 1.5 and 1.7;
(b) Each TPRD unit is activated according to Annex 4, paragraph 1.9. After activation and without cleaning,
removal of parts, or reconditioning, each TPRD unit is subjected to flow test using hydrogen, air or an inert
gas;
(c) Flow rate testing is conducted with a gas inlet pressure of 2 (± 0,5) MPa. The outlet is at ambient pressure.
The inlet temperature and pressure are recorded;
(d) Flow rate is measured with accuracy within ± 2 per cent. The lowest measured value of the eight pressure
relief devices shall not be less than 90 per cent of the highest flow value.17.5.2019 EN Official Journal of the European Union L 129/79
2. TESTS FOR CHECK VALVE AND SHUT-OFF VALVE
Testing shall be performed with hydrogen gas having gas quality compliant with ISO 14687-2/SAE J2719. All
tests are performed at ambient temperature 20 (± 5) °C unless otherwise specified. The check valve and shut-off
valve qualification performance tests are specified as follows (see also Appendix 2):
2.1. Hydrostatic strength test
The outlet opening in components is plugged and valve seats or internal blocks are made to assume the open
position. One unit is tested without being subjected to other design qualification tests in order to establish
a baseline burst pressure, other units are tested as specified in subsequent tests of Annex 4, paragraph 2.
(a) A hydrostatic pressure of 250 per cent NWP (+ 2/– 0 MPa) is applied to the inlet of the component for three
minutes. The component is examined to ensure that rupture has not occurred;
(b) The hydrostatic pressure is then increased at a rate of less than or equal to 1,4 MPa/sec until component
failure. The hydrostatic pressure at failure is recorded. The failure pressure of previously tested units shall be
no less than 80 per cent of the failure pressure of the baseline, unless the hydrostatic pressure exceeds 400
per cent NWP.
2.2. Leak test
One unit that has not undergone previous testing is tested at ambient, high and low temperatures without being
subjected to other design qualification tests. The three temperature test conditions are:
(a) Ambient temperature: condition the unit at 20 (± 5) °C; test at 5 per cent NWP (+ 0/– 2 MPa) and 150 per
cent NWP (+ 2/– 0 MPa);
(b) High temperature: condition the unit at 85 °C or higher; test at 5 per cent NWP (+ 0/– 2 MPa) and 150 per
cent NWP (+ 2/– 0 MPa);
(c) Low temperature: condition the unit at – 40 °C or lower; test at 5 per cent NWP (+ 0/– 2 MPa) and 100 per
cent NWP (+ 2/– 0 MPa).
Additional units undergo leak testing as specified in other tests in Annex 4, paragraph 2 with uninterrupted
exposure at the temperatures specified in those tests.
The outlet opening is plugged with the appropriate mating connection and pressurised hydrogen is applied to the
inlet. At all specified test temperatures, the unit is conditioned for one minute by immersion in a temperature
controlled fluid (or equivalent method). If no bubbles are observed for the specified time period, the sample
passes the test. If bubbles are detected, the leak rate is measured by an appropriate method. The leak rate shall not
exceed 10 Nml/hr of hydrogen gas.
2.3. Extreme temperature pressure cycling test
(a) The total number of operational cycles is 11 000 for the check valve and 50 000 for the shut-off valve. The
valve unit are installed in a test fixture corresponding to the manufacturer's specifications for installation. The
operation of the unit is continuously repeated using hydrogen gas at all specified pressures.
An operational cycle shall be defined as follows:
(i) A check valve is connected to a test fixture and 100 per cent NWP (+ 2/– 0 MPa) is applied in six step
pulses to the check valve inlet with the outlet closed. The pressure is then vented from the check valve
inlet. The pressure is lowered on the check valve outlet side to less than 60 per cent NWP prior to the
next cycle;
(ii) A shut-off valve is connected to a test fixture and pressure is applied continuously to the both the inlet
and outlet sides.
An operational cycle consists of one full operation and reset.L 129/80 EN Official Journal of the European Union 17.5.2019
(b) Testing is performed on a unit stabilised at the following temperatures:
(i) Ambient temperature cycling. The unit undergoes operational (open/closed) cycles at 125 per cent NWP
(+ 2/– 0 MPa) through 90 per cent of the total cycles with the part stabilised at 20 (± 5) °C. At the
completion of the ambient temperature operational cycles, the unit shall comply with the ambient
temperature leak test specified in Annex 4, paragraph 2.2;
(ii) High temperature cycling. The unit then undergoes operational cycles at 125 per cent NWP (+ 2/– 0 MPa)
through 5 per cent of the total operational cycles with the part stabilised at 85 °C or higher. At the
completion of the 85 °C cycles, the unit shall comply with the high temperature (85 °C) leak test specified
in Annex 4, paragraph 2.2;
(iii) Low temperature cycling. The unit then undergoes operational cycles at 100 per cent NWP (+ 2/– 0 MPa)
through 5 per cent of the total cycles with the part stabilised at – 40 °C or lower. At the completion of
the – 40 °C operational cycles, the unit shall comply with the low temperature (– 40 °C) leak test
specified in Annex 4, paragraph 2.2.
(c) Check valve chatter flow test: Following 11 000 operational cycles and leak tests in Annex 4,
paragraph 2.3(b), the check valve is subjected to 24 hours of chatter flow at a flow rate that causes the most
chatter (valve flutter). At the completion of the test the check valve shall comply with the ambient
temperature leak test (Annex 4, paragraph 2.2) and the strength test (Annex 4, paragraph 2.1).
2.4. Salt corrosion resistance test
The component is supported in its normally installed position and exposed for 500 hours to a salt spray (fog) test
as specified in ASTM B117 (Standard Practice for Operating Salt Spray (Fog) Apparatus). The temperature within
the fog chamber is maintained at 30-35 °C). The saline solution consists of 5 per cent sodium chloride and
95 per cent distilled water, by weight.
Immediately after the corrosion test, the sample is rinsed and gently cleaned of salt deposits, examined for
distortion, and then shall comply with the requirements of:
(a) The component shall not show signs of physical degradation that could impair the function of the
component, specifically: cracking, softening or swelling. Cosmetic changes such as pitting or staining are not
failures;
(b) The ambient temperature leak test (Annex 4, paragraph 2.2);
(c) The hydrostatic strength test (Annex 4, paragraph 2.1).
2.5. Vehicle environment test
Resistance to degradation by exposure to automotive fluids is determined by the following test.
(a) The inlet and outlet connections of the valve unit are connected or capped in accordance with the manufac
turers installation instructions. The external surfaces of the valve unit are exposed for 24 hours at 20 (± 5) °C
to each of the following fluids:
(i) Sulphuric acid – 19 per cent solution by volume in water;
(ii) Sodium hydroxide – 25 per cent solution by weight in water;
(iii) Ammonium nitrate – 28 per cent by weight in water; and
(iv) Windshield washer fluid (50 per cent by volume methyl alcohol and water).
The fluids are replenished as needed to ensure complete exposure for the duration of the test. A distinct test is
performed with each of the fluids. One component may be used for exposure to all of the fluids in sequence.
(b) After exposure to each chemical, the component is wiped off and rinsed with water;
(c) The component shall not show signs of physical degradation that could impair the function of the
component, specifically: cracking, softening, or swelling. Cosmetic changes such as pitting or staining are not
failures. At the conclusion of all exposures, the unit(s) shall comply with the requirements of the ambient
temperature leakage test (Annex 4, paragraph 2.2) and Hydrostatic Strength Test (Annex 4, paragraph 2.1).17.5.2019 EN Official Journal of the European Union L 129/81
2.6. Atmospheric exposure test
The atmospheric exposure test applies to qualification of check valve and automatic shut-off valves if the
component has non-metallic materials exposed to the atmosphere during normal operating conditions.
(a) All non-metallic materials that provide a fuel containing seal, and that are exposed to the atmosphere, for
which a satisfactory declaration of properties is not submitted by the applicant, shall not crack or show visible
evidence of deterioration after exposure to oxygen for 96 hours at 70 °C at 2 MPa in accordance with ASTM
D572 (Standard Test Method for Rubber- Deterioration by Heat and Oxygen);
(b) All elastomers shall demonstrate resistance to ozone by one or more of the following:
(i) Specification of elastomer compounds with established resistance to ozone;
(ii) Component testing in accordance with ISO 1431/1, ASTM D1149, or equivalent test methods.
2.7. Electrical Tests
The electrical tests apply to qualification of the automatic shut-off valve; they do not apply to qualification of
check valves.
(a) Abnormal voltage test. The solenoid valve is connected to a variable DC voltage source. The solenoid valve is
operated as follows:
(i) An equilibrium (steady state temperature) hold is established for one hour at 1,5 times the rated voltage;
(ii) The voltage is increased to two times the rated voltage or 60 volts, whichever is less, and held for one
minute;
(iii) Any failure shall not result in external leakage, open valve or unsafe conditions such as smoke, fire or
melting.
The minimum opening voltage at NWP and room temperature shall be less than or equal to 9 V for a 12 V
system and less than or equal to 18 V for a 24 V system.
(b) Insulation resistance test. 1 000 V D.C. is applied between the power conductor and the component casing
for at least two seconds. The minimum allowable resistance for that component is 240 kΩ.
2.8. Vibration test
The valve unit is pressurised to its 100 per cent NWP (+ 2/– 0 MPa) with hydrogen, sealed at both ends, and
vibrated for 30 minutes along each of the three orthogonal axes (vertical, lateral and longitudinal) at the most
severe resonant frequencies. The most severe resonant frequencies are determined by acceleration of 1,5 g with
a sweep time of 10 minutes within a sinusoidal frequency range of 10 to 40 Hz. If the resonance frequency is not
found in this range the test is conducted at 40 Hz. Following this test, each sample shall not show visible exterior
damage that indicates that the performance of the part is compromised. At the completion of the test, the unit
shall comply with the requirements of the ambient temperature leak test specified in Annex 4, paragraph 2.2.
2.9. Stress corrosion cracking test
For the valve units containing components made of a copper-based alloy (e.g. brass), one valve unit is tested. The
valve unit is disassembled, all copper-based alloy components are degreased and then the valve unit is reassembled
before it is continuously exposed for 10 days to a moist ammonia-air mixture maintained in a glass chamber
having a glass cover.
Aqueous ammonia having a specific gravity of 0,94 is maintained at the bottom of the glass chamber below the
sample at a concentration of at least 20 ml per litre of chamber volume. The sample is positioned 35 (± 5) mm
above the aqueous ammonia solution and supported in an inert tray. The moist ammonia-air mixture is
maintained at atmospheric pressure at 35 (± 5) °C. Copper-based alloy components shall not exhibit cracking or
delaminating due to this test.L 129/82 EN Official Journal of the European Union 17.5.2019
2.10. Pre-cooled hydrogen exposure test
The valve unit is subjected to pre-cooled hydrogen gas at – 40 °C or lower at a flow rate of 30 g/sec at external
temperature of 20 (± 5) °C for a minimum of three minutes. The unit is de-pressurised and re-pressurised after
a two minute hold period. This test is repeated 10 times. This test procedure is then repeated for an additional
10 cycles, except that the hold period is increased to 15 minutes. The unit shall then comply with the
requirements of the ambient temperature leak test specified in Annex 4, paragraph 2.2.APPENDIX 1
OVERVIEW OF TPRD TESTS
17.5.2019
EN
Official
Journal
of
the
European
Union
L
129/83APPENDIX 2
OVERVIEW OF CHECK VALVE AND AUTOMATIC SHUT-OFF VALVE TESTS
L
129/84
EN
Official
Journal
of
the
European
Union
17.5.201917.5.2019 EN Official Journal of the European Union L 129/85
ANNEX 5
TEST PROCEDURES FOR A VEHICLE FUEL SYSTEM INCORPORATING THE COMPRESSED HYDROGEN
STORAGE SYSTEM
1. POST-CRASH COMPRESSED HYDROGEN STORAGE SYSTEM LEAK TEST
The crash tests used to evaluate post-crash hydrogen leakage are those set out in paragraph 7.2 of this
Regulation.
Prior to conducting the crash test, instrumentation is installed in the hydrogen storage system to perform the
required pressure and temperature measurements if the standard vehicle does not already have instrumentation
with the required accuracy.
The storage system is then purged, if necessary, following manufacturer's directions to remove impurities from
the container before filling the storage system with compressed hydrogen or helium gas. Since the storage
system pressure varies with temperature, the targeted fill pressure is a function of the temperature. The target
pressure shall be determined from the following equation:
P = NWP × (273 + T) / 288
target o
where NWP is the Nominal Working Pressure (MPa), T is the ambient temperature to which the storage
o
system is expected to settle, and P is the targeted fill pressure after the temperature settles.
target
The container is filled to a minimum of 95 per cent of the targeted fill pressure and allowed to settle (stabilise)
prior to conducting the crash test.
The main stop valve and shut-off valves for hydrogen gas, located in the downstream hydrogen gas piping, are
in normal driving condition immediately prior to the impact.
1.1. Post-crash leak test: compressed hydrogen storage system filled with compressed hydrogen
The hydrogen gas pressure, P (MPa) and temperature, T (°C) are measured immediately before the impact and
0 0
then at a time interval, Δt (min), after the impact. The time interval, Δt, starts when the vehicle comes to rest
after the impact and continues for at least 60 minutes. The time interval, Δt, shall be increased, if necessary, to
accommodate measurement accuracy for a storage system with a large volume operating up to 70 MPa; in
that case, Δt is calculated from the following equation:
Δt = V × NWP / 1 000 × ((– 0,027 × NWP + 4) × R – 0,21) – 1,7 × R
CHSS s s
where R = P / NWP, P is the pressure range of the pressure sensor (MPa), NWP is the Nominal Working
s s s
Pressure (MPa), V is the volume of the compressed hydrogen storage system (l), and Δt is the time interval
CHSS
(min). If the calculated value of Δt is less than 60 minutes, Δt is set to 60 minutes.
The initial mass of hydrogen in the storage system is calculated as follows:
P′ = P × 288 / (273 + T )
o o 0
ρ′ = – 0,0027 × (P ′)2 + 0,75 × P ′ + 0,5789
o 0 0
M = ρ′ × V
o o CHSS
The final mass of hydrogen in the storage system, M, at the end of the time interval, Δt, is calculated as
f
follows:
P′ = P × 288 / (273 + T)
f f f
ρ′ = – 0,0027 × (P′)2 + 0,75 × P′ + 0,5789
f f f
M = ρ′ × V
f f CHSS
where P is the measured final pressure (MPa) at the end of the time interval, and T is the measured final
f f
temperature (°C).L 129/86 EN Official Journal of the European Union 17.5.2019
The average hydrogen flow rate over the time interval (that shall be less than the criteria in paragraph 7.2.1) is
therefore
V = (M – M) / Δt × 22,41 / 2,016 × (P / P)
H2 f o target o
where V is the average volumetric flow rate (NL/min) over the time interval and the term (P / P) is used
H2 target o
to compensate for differences between the measured initial pressure, P, and the targeted fill pressure P .
o target
1.2. Post-crash leak test: Compressed hydrogen storage system filled with compressed helium
The helium gas pressure, P (MPa), and temperature T (°C), are measured immediately before the impact and
0 0
then at a predetermined time interval after the impact. The time interval, Δt, starts when the vehicle comes to
rest after the impact and continues for at least 60 minutes. The time interval, Δt, shall be increased if
necessary in order to accommodate measurement accuracy for a storage system with a large volume operating
up to 70 MPa; in that case, Δt is calculated from the following equation:
Δt = V × NWP / 1 000 × ((– 0,028 × NWP + 5,5) × R – 0,3) – 2,6 × R
CHSS s s
where R = P / NWP, P is the pressure range of the pressure sensor (MPa), NWP is the Nominal Working
s s s
Pressure (MPa), V is the volume of the compressed hydrogen storage system (l), and Δt is the time interval
CHSS
(min). If the value of Δt is less than 60 minutes, Δt is set to 60 minutes.
The initial mass of helium in the storage system is calculated as follows:
P′ = P × 288 / (273 + T )
o o 0
ρ′ = – 0,0043 × (P ′)2 + 1,53 × P ′ + 1,49
o 0 0
M = ρ′ × V
o o CHSS
The final mass of helium in the storage system, M, at the end of the time interval, Δt, is calculated as follows:
f
P′ = P × 288 / (273 + T)
f f f
ρ′ = – 0,0043 × (P′)2 + 1,53 × P′ + 1,49
f f f
M = ρ′ × V
f f CHSS
where P is the measured final pressure (MPa) at the end of the time interval, and T is the measured final
f f
temperature (°C).
The average helium flow rate over the time interval is therefore
V = (M-M) / Δt × 22,41 / 4,003 × (P / P)
He f o target o
where V is the average volumetric flow rate (NL/min) over the time interval and the term P /P is used to
He target o
compensate for differences between the measured initial pressure (P) and the targeted fill pressure (P ).
o target
Conversion of the average volumetric flow of helium to the average hydrogen flow is calculated with the
following expression:
V = V / 0,75
H2 He
where V is the corresponding average volumetric flow of hydrogen (that shall be less than the requirements
H2
in paragraph 7.2.1 of this Regulation to comply with).
2. POST-CRASH CONCENTRATION TEST FOR ENCLOSED SPACES
The measurements are recorded in the crash test that evaluates potential hydrogen (or helium) leakage
(Annex 5, paragraph 1 test procedure).
Sensors are selected to measure either the build-up of the hydrogen or helium gas or the reduction in oxygen
(due to displacement of air by leaking hydrogen/helium).17.5.2019 EN Official Journal of the European Union L 129/87
Sensors are calibrated to traceable references to ensure an accuracy of ± 5 per cent at the targeted criteria of
4 per cent hydrogen or 3 per cent helium by volume in air, and a full scale measurement capability of at least
25 per cent above the target criteria. The sensor shall be capable of a 90 per cent response to a full scale
change in concentration within 10 seconds.
Prior to the crash impact, the sensors are located in the passenger and, luggage compartments of the vehicle
as follows:
(a) At a distance within 250 mm of the headliner above the driver's seat or near the top centre the passenger
compartment;
(b) At a distance within 250 mm of the floor in front of the rear (or rear most) seat in the passenger
compartment;
(c) At a distance within 100 mm of the top of luggage compartments within the vehicle that are not directly
affected by the particular crash impact to be conducted.
The sensors are securely mounted on the vehicle structure or seats and protected for the planned crash test
from debris, air bag exhaust gas and projectiles. The measurements following the crash are recorded by
instruments located within the vehicle or by remote transmission.
The vehicle may be located either outdoors in an area protected from the wind and possible solar effects or
indoors in a space that is large enough or ventilated to prevent the build-up of hydrogen to more than 10 per
cent of the targeted criteria in the passenger and luggage compartments.
Post-crash data collection in enclosed spaces commences when the vehicle comes to a rest. Data from the
sensors are collected at least every 5 seconds and continue for a period of 60 minutes after the test. A first-
order lag (time constant) up to a maximum of 5 seconds may be applied to the measurements to provide
‘smoothing’ and filter the effects of spurious data points.
The filtered readings from each sensor shall be below the targeted criteria of 4,0 per cent for hydrogen or
3,0 per cent for helium at all times throughout the 60 minutes post-crash test period.
3. COMPLIANCE TEST FOR SINGLE FAILURE CONDITIONS
Either test procedure of Annex 5, paragraph 3.1 or paragraph 3.2 shall be executed:
3.1. Test procedure for vehicle equipped with hydrogen gas leakage detectors
3.1.1. Test condition
3.1.1.1. Test vehicle: The propulsion system of the test vehicle is started, warmed up to its normal operating
temperature, and left operating for the test duration. If the vehicle is not a fuel cell vehicle, it is warmed up
and kept idling. If the test vehicle has a system to stop idling automatically, measures are taken so as to
prevent the engine from stopping.
3.1.1.2. Test gas: Two mixtures of air and hydrogen gas: 3,0 per cent concentration (or less) of hydrogen in the air to
verify function of the warning, and 4,0 per cent concentration (or less) of hydrogen in the air to verify the
shut-down function. The proper concentrations are selected based on the recommendation (or the detector
specification) by the manufacturer.
3.1.2. Test method
3.1.2.1. Preparation for the test: The test is conducted without any influence of wind by appropriate means such as:
(a) A test gas induction hose is attached to the hydrogen gas leakage detector;
(b) The hydrogen leak detector is enclosed with a cover to make gas stay around hydrogen leak detector.
3.1.2.2. Execution of the test
(a) Test gas is blown to the hydrogen gas leakage detector;L 129/88 EN Official Journal of the European Union 17.5.2019
(b) Proper function of the warning system is confirmed when tested with the gas to verify function of the
warning;
(c) The main shut-off valve is confirmed to be closed when tested with the gas to verify function of the shut-
down. For example, the monitoring of the electric power to the shut-off valve or of the sound of the shut-
off valve activation may be used to confirm the operation of the main shut-off valve of the hydrogen
supply.
3.2. Test procedure for integrity of enclosed spaces and detection systems.
3.2.1. Preparation:
3.2.1.1. The test is conducted without any influence of wind.
3.2.1.2. Special attention is paid to the test environment as during the test, flammable mixtures of hydrogen and air
may occur.
3.2.1.3. Prior to the test the vehicle is prepared to allow remotely controllable hydrogen releases from the hydrogen
system. The number, location and flow capacity of the release points downstream of the main hydrogen shut-
off valve are defined by the vehicle manufacturer taking worst case leakage scenarios under single failure
condition into account. As a minimum, the total flow of all remotely controlled releases shall be adequate to
trigger demonstration of the automatic ‘warning’ and hydrogen shut-off functions.
3.2.1.4. For the purpose of the test, a hydrogen concentration detector is installed where hydrogen gas may
accumulate most in the passenger compartment (e.g. near the headliner) when testing for compliance with
paragraph 7.1.4.2 of this Regulation and hydrogen concentration detectors are installed in enclosed or semi
enclosed volumes on the vehicle where hydrogen can accumulate from the simulated hydrogen releases when
testing for compliance with paragraph 7.1.4.3 of this Regulation (see Annex 5, paragraph 3.2.1.3).
3.2.2. Procedure:
3.2.2.1. Vehicle doors, windows and other covers are closed.
3.2.2.2. The propulsion system is started, allowed to warm up to its normal operating temperature and left operating
at idle for the test duration.
3.2.2.3. A leak is simulated using the remote controllable function.
3.2.2.4. The hydrogen concentration is measured continuously until the concentration does not rise for 3 minutes.
When testing for compliance with paragraph 7.1.4.3 of this Regulation, the simulated leak is then increased
using the remote controllable function until the main hydrogen shut-off valve is closed and the tell-tale
warning signal is activated. The monitoring of the electric power to the shut-off valve or of the sound of the
shut-off valve activation may be used to confirm the operation of the main shut-off valve of the hydrogen
supply.
3.2.2.5. When testing for compliance with paragraph 7.1.4.2 of this Regulation, the test is successfully completed if
the hydrogen concentration in the passenger compartment does not exceed 1,0 per cent. When testing for
compliance with paragraph 7.1.4.3 of this Regulation, the test is successfully completed if the tell-tale warning
and shut-off function are executed at (or below) the levels specified in paragraph 7.1.4.3 of this Regulation;
otherwise, the test is failed and the system is not qualified for vehicle service.
4. COMPLIANCE TEST FOR THE VEHICLE EXHAUST SYSTEM
4.1. The power system of the test vehicle (e.g. fuel cell stack or engine) is warmed up to its normal operating
temperature.
4.2. The measuring device is warmed up before use to its normal operating temperature.
4.3. The measuring section of the measuring device is placed on the centre line of the exhaust gas flow within
100 mm from the exhaust point of discharge external to the vehicle.17.5.2019 EN Official Journal of the European Union L 129/89
4.4. The exhaust hydrogen concentration is continuously measured during the following steps:
(a) The power system is shut-down;
(b) Upon completion of the shut-down process, the power system is immediately started;
(c) After a lapse of one minute, the power system is turned off and measurement continues until the power
system shut-down procedure is completed.
4.5. The measurement device shall have a measurement response time of less than 300 milliseconds.
5. COMPLIANCE TEST FOR FUEL LINE LEAKAGE
5.1. The power system of the test vehicle (e.g. fuel cell stack or engine) is warmed up and operating at its normal
operating temperature with the operating pressure applied to fuel lines.
5.2. Hydrogen leakage is evaluated at accessible sections of the fuel lines from the high-pressure section to the fuel
cell stack (or the engine), using a gas leak detector or a leak detecting liquid, such as soap solution.
5.3. Hydrogen leak detection is performed primarily at joints
5.4. When a gas leak detector is used, detection is performed by operating the leak detector for at least 10 seconds
at locations as close to fuel lines as possible.
5.5. When a leak detecting liquid is used, hydrogen gas leak detection is performed immediately after applying the
liquid. In addition, visual checks are performed a few minutes after the application of liquid to check for
bubbles caused by trace leaks.
6. INSTALLATION VERIFICATION
The system is visually inspected for compliance.