Date: 2024-03-13Category: Not ApplicableState: Uttar PradeshCountry: India
पी0एम0 गतिशक्ति योजना के अंतर्गत संचालित होने वाली योजनाओं के लिए रिवाल्विंग फण्ड मद से रू.5760.34 लाख की वित्तीय स्वीकृति निर्गत किये जाने के संबंध में।
**Executive Summary:**
This document from the Government of Uttar Pradesh, dated March 13, 2024, grants financial approval of ₹5760.34 lakh for the PM Gatishakti Yojana. The funds are to be allocated from the revolving fund for projects under the scheme for the financial year 2023-24. The funds are subject to the conditions and restrictions outlined in the document.
**Key Points / Main Content:**
* **Financial Approval:** Grants ₹5760.34 lakh from the revolving fund for the PM Gatishakti Yojana.
* **Purpose:** Funds are allocated for civil and electrical projects in various industrial areas under Nagar Nigam, Ghaziabad and Bulandshahar road District Ghaziabad
* **Project Details:** Lists specific construction and improvement projects, including:
* Construction/repair of roads and drains.
* Installation of signage, gantry boards, road safety devices, and LED street lights.
* **Budget Allocation:**
* Civil works amount to ₹4364.90 lakh.
* Electrical works amount to ₹1395.44 lakh.
* **Expenditure Conditions:**
* Funds must be used only for the approved projects.
* Utilization certificates must be submitted by the CEO of UPSIDA.
* Expenditure must adhere to the terms outlined in the work plan and government orders.
* Withdrawals from the treasury should be based on immediate requirements.
* Funds should not be deposited in a bank account in advance.
* **Compliance:** All directives issued by the Department of Finance (Income-Expenditure) on March 17, 2023, and any other relevant government orders must be strictly followed.
**Impact Analysis:**
**Stakeholder:** UPSIDA (Uttar Pradesh State Industrial Development Authority)
* **Impact:** Responsible for utilizing the funds for the approved projects within Ghaziabad's industrial areas, adhering to stated terms and regulations. Must furnish utilization certificates promptly.
* **Action Required:** Ensure projects are implemented according to the guidelines, manage accounts, provide utilization certificates, and follow the instructions from the Commissioner and Director of Industries.
**Stakeholder:** Commissioner and Director of Industries, Kanpur
* **Impact:** Responsible for overseeing fund withdrawals based on UPSIDA's requirements and project needs, and for monitoring project execution.
* **Action Required:** Authorize withdrawals based on requests from UPSIDA, monitor adherence to regulations and guidelines, and ensure project progress.
**Stakeholder:** Department of Industrial Development and Finance Department, Government of Uttar Pradesh
* **Impact:** Required to monitor the financial allocations and expenditures for compliance and alignment with the PM Gatishakti Yojana objectives.
* **Action Required:** Review the utilization of funds and compliance reports to ensure that the funds are being used efficiently and as intended.
Key Entities Referenced
PM Gati Shakti Yojana: A scheme to provide infrastructure development for industrial areas.
UPSIDA (Uttar Pradesh State Industrial Development Authority): The authority responsible for executing the infrastructure development projects mentioned in the document.
Ghaziabad: The district in Uttar Pradesh where the industrial area development projects are located.
Kanpur: Location of Udyog Nideshalay
WEAT-4/2024/568/77-6-24-6099/38/2023 पार्ट-2
मनोज कुमार मौर्य,
संयुक्त सचिव,
उत्तर प्रदेश शासन।
सेवा में,
आयुक्त एवं निदेशक,
उद्योग,
उद्योग निदेशालय, कानपुर।
औद्योगिक विकास अनुभाग-6 लखनऊ : दिनांक 3/03/2024
विषय:- पी0एम0 गतिशक्ति योजना के अंतर्गत संचालित होने वाली योजनाओं के लिए रिवाल्विंग
tus मद से रू.5760.34 लाख की वित्तीय स्वीकृति निर्गत किये जाने के संबंध में।
महोदय,
कृपया. उपर्युक्त विषयक. यूपीसीडा के. पत्र संख्या-978/यूपीसीडा/पीजीएमएस/पी0एम0
गतिशक्ति, दिनांक 23.02.2024 का संदर्भ ग्रहण करने का कष्ट करें जिसके द्वारा चालू वित्तीय वर्ष
2023-24 के. आय-व्ययक में पीएएम0 गतिशक्ति रिवाल्विंग wus मद में प्राविधिनित धनराशि के
सापेक्ष शासन के पत्र दिनांक 02.02.2024 cant स्वीकृति कार्ययोजना के क्रम में कुल 39 कार्यों का
आगणन उपलब्ध कराया गया है एवं कार्यों के सम्मुख अंकित धनराशि अवमुक्त किये जाने का
अनुरोध किया गया है।
2- उपर्युक्त प्रकरण में सम्यक विचारोपरान्त निम्न विवरणानुसार नये निर्माण कार्यों एवं उसके
सम्मुख अंकित धनराशि की वित्तीय स्वीकृति प्रदान किये जाने का निर्णय लिया गया है-
Details of estimates proposed at various industrial areas under Nagar
Nigam, Gaziabad
| Sino | no Name of Work Amount (in Lakh)
Industrial Area site-4 Sahibabad Ghaziabad
| Providing And Fixing of Cantilever Gantry Sign Board, 69.50
Road Direction Board and Guide Map in Industrial Area
Site-4 Sahibabad Ghaziabad
|.A, Loha Mandi, Distt.-Gaziabad
2 Construction Of R.C.C. Roads & Drain of Existing Rd. 445.04
No. 3, 5, 6, 8, 2 & 7 At LA. Loha Mandi, Distt
Ghaziabad.
3 Construction Of R.C.C. Roads & Drain of Existing Rd. 27.23
No. 0, , 8 & 9 At IA. Loha Mandi, Distt
Ghaziabad.
4 Providing And Fixing Signage Board & Road Safety 26.9
Devices at IA Loha Mandi, Distt. Ghaziabad
I.A. South Side G.T. Road, Distt: Ghaziabad
I- Ue शासनादेश इलेक्ट्रानिकली जारी किया गया है, अत: इस पर हस्ताक्षर की आवश्यकता नही है |
2- इस शासनादेश की प्रमाणिकता वेब साइट htip://shasanadesh.up.gov.in से सत्यापित की जा सकती है |Widening, Strengthening & Interlocking Tiles 0 459.5
Existing Road from Road No.8 (Rathi Road) to Plot No.
35/| & From Plot No. E- 32 to C-74(N.H.-9) at LA.
South Side G.T. Road, Distt: - Ghaziabad
Widening & Strengthening of Existing Road from Plot 443.37
noc-.3/5 (Rathi Road) to Plot No. G- (Petrol Pump)
and from Plot no, 27 to 29& Sub Division Road of Plot
No. 33 And R.C.C. Drain at |.A. South Side G.T. Road,
Distt: - Ghaziabad
Widening, Strengthening and Construction of R.CC. 477.37
Drain ofSub Division Road of "A Block" at |.A. South
Side G.T. Road. Distt: Ghaziabad.
Providing And Fixing of Cantilever Gentry Sign Board 9.89
Road Direction Board and Guide Map in Industrial Area
South Side Gt Road Ghaziabad
Name of Work औद्योगिक क्षेत्र बुलं रोड़ गाजियाबाद।
की
Bulandshahar road Industrial Area Main Road No. 227.58
Construction work of 2 drain & RCC road ka Nirman
Karya.
0 Bulandshahar Road Industrial Area Main Road No. क 723.93
Nala & RCC Road ka Nirman Karya.
Bulandshahar Road Industrial Area Main Road No. 239.77
Construction work of 23 drains and RCC road.
I2 Bulandshahar Road Industrial Area Main Road No. 233.67
Construction work of 22 drains and RCC road ka
Nirman Karya.
3 Bulardshahar Road Industrial Area Main Road No. 360.2
Construction work of 2 Per Nala & RCC Road ka
Nirman Karya.
4 Construction work of drain & RCC road from B 22/6 to 756.07
B 22/3 till back side of Bulandshaher Road Industrial
Area Main Mukherji Park ka Nirman Karya.
5 Bulandshahar Road Industrial Area Main Road No. 24.90
Construction work of 8 Per Nala & RCC Road ka
Nirman Karya.
6 Bulandshahar Road Industrial Area Main Road No. 2 72.7
Construction work of drain & RCC road ka Nirman
Karya.
7 Bulandshahar Road Industrial Area Main Road No. 20 9.84
per drain & Construction work of RCC Road ka Nirman
Karya.
8 Strengthening/Widening of Existing Road No. 2 (Part) 382.69
24, 32 & 33 And Construction of Drain at Rond No. 9 &
- यह शासनादेश इलेक्ट्रानिकली जारी किया गया है, अत: इस पर हस्ताक्षर की आवश्यकता नही है |
2- इस शासनादेश की प्रमाणिकता वेब साइट htip://shasanadesh.up.gov.in से सत्यापित की जा सकती है |34 AL IA Bulandshahar Road Distt: Ghaziabad
9 Providing And Fixing of Cantilever Gantry Board, Road 38.77
Direction Board and Guide Map Industrial Area
Bulandshahar Road, Ghaziabad.
Total 4364.9
Civil Total
विदयुत PA की लागत निम्नानुसार है:-
SI.No. | Name of I.A Name of Work Amount (in Lakh)
7 {Bulandshahar Road _ jLed Hight Mast 68.77
2 Led Street Led Hight Mast 397.88
3 Led Hight Mast 55.54
4 |Loha Mandi Led Street Led Hight Mast 89.00
5 |SGST Led Hight Mast 68.60
| 6 | Led Street Light Network 37.42
7. |Sahibabad Site-4 Led Hight Mast 398.23
योग विद्युत कार्य p 395.44
Grand Total (Civil+Electirical) 5760.34
2- अत: इस सम्बन्ध में मुझे यह कहने का निदेश हुआ है कि Udaadn वित्तीय वर्ष 2023-24
के बजट मैं अनुदान संख्या-07 के लेखाशीर्ष 6875-अन्य उद्योगो के लिए कर्ज, 60- Hey उद्योग,
800- अन्य कर्ज, 03-पीएएम0 गतिशक्ति योजना के अंतर्गत संचालित होने Ae! योजनाओं के लिए
रिवाल्विंग wus मानक मद 30 निवेश/ऋण A एकमुश्त धनराशि रू. 20000.00 लाख के सापेक्ष
उक्त तालिका में अंकित कुल (9 सिविल कार्य लागत रू.4364.90 लाख एवं 7 विद्युत कार्य लागत
€.395.44 लाख अर्थात कुल लागत रू. 5760.34 लाख (रू. सत्तावन करोड साठ लाख चौंतीस
हजार मात्र) की धनराशि आपके निवर्तन पर रखने हेतु निम्नलिखित शर्तों एवं प्रतिबन्धों के अधीन
वित्तीय स्वीकृति निर्गत किए जाने की श्री राज्यपाल सहर्ष स्वीकृति प्रदान करते हैं:-
नियम व शर्तें/प्रतिबन्धों
. स्वीकृत धनराशि स्वीकृत कार्य के लिए ही व्यय की जाएगी।
2. . स्वीकृत धनराशि का उपयोगिता प्रमाण पत्र मुख्य कार्यपालक अधिकारी, यूपीसीडा द्वारा
तत्काल शासन के औद्योगिक विकास विभाग अनुभाग-6/वित्त (आय व्ययक) अनुभाग-4
एवं समस्त संबंधितों को उपलब्ध कराया जाएगा।
3. यूपीसीडा द्वारा कार्ययोजना में उल्लिखित शर्तों एवं प्रतिबन्धों के अधीन धनराशि व्यय
की जाएगी।
4. स्वीकृत धनराशि का आहरण राजकोष से तात्कालिक आवश्यकता के आधार पर ही किया
जायेगा।
5. किसी परिस्थिति में धनराशि को पूर्व से आहरित करके एकमुश्त बैंक खाते/अन्य किसी
खाते में नहीं रखा जाएगा।
I- Ue शासनादेश इलेक्ट्रानिकली जारी किया गया है, अत: इस पर हस्ताक्षर की आवश्यकता नही है |
2- इस शासनादेश की प्रमाणिकता वेब साइट htip://shasanadesh.up.gov.in से सत्यापित की जा सकती है |6. स्वीकृत धनराशि का लेखा-जोखा मुख्य कार्यपाल अधिकारी, यूपीसीडा, उत्तर प्रदेश द्वारा
रखा जाएगा।
7. स्वीकृत धनराशि का व्यय केवल उसी मद मैं किया जाएगा, जिसके लिए स्वीकृत किया
गया है।
8. यह धनराशि समय-समय पर निर्गत शासनादेशों एवं लोक निर्माण विभाग qa निर्धारित
मार्गदर्शी aur एवं मानकों के अधीन मुख्य कार्यपालक अधिकारी, यूपीसीडा की मांग
पर आयुक्त एवं निदेशक, उद्योग GANT आहरित कर प्रदान की जाएगी।
9. स्वीकृत धनराशि का आहरण एक माह की आवश्यकतानुसार किया जाएगा। आवश्यकता
का आंकलन मुख्य कार्यपालक अधिकारी, यूपीसीडा द्वारा किया जाएगा।
|0. स्वीकृत धनराशि को व्यय किये जाने से पूर्व वित्त (आय-व्ययक) अनुभाग-। के कार्यालय
ज्ञाप दिनांक (7.03.2023 एवं अन्य संगत शासनादेशों द्वारा जारी दिशा-निर्देशों का
पूर्णतया अनुपालन सुनिश्चित किया जाएगा।
3- इस संबंध में होने वाला व्यय रू. 5760.34 लाख (रू. सत्तावन करोड साठ लाख चौंतीस हजार
मात्र) को चालू वित्तीय वर्ष 2023-2024 के आय-व्ययक मे अनुदान संख्या 007 लेखा शीर्षक
6875608000300 पी0एम0 गतिशक्ति योजना के अंतर्गत संचालित होने वाली योजनाओं के लिए
रिवाल्विंग फण्ड मानक मद 30 निवेश/ऋण के AA डाला जायेगा।
4- यह आदेश वित्त (आय-व्ययक) अनुभाग-। के कार्यालय AT संख्या-2/2023/बी--227/दस-
2023-23/2023, दिनांक 7 मार्च, 2023 में प्रशासकीय विभाग को उक्तवत प्रतिनिधानित अधिकार
के अंतर्गत निर्गत किये जा रहें है।
भवदीय,
मनोज कुमार मौर्य
संयुक्त सचिव।
UEAT- 4/2024/568/7 7-6-24-6099/38/2023 पार्ट-2,तद्दिनांक |
प्रतिलिपि निम्नलिखित को सूचनार्थ एवं आवश्यक कार्यवाही हेतु प्रेषित:-
!) महालेखाकार(लेखा एवं हकदारी)प्रथम/दवितीय, उ०प्र०, प्रयागराज।
2) मुख्य कार्यपालक अधिकारी, इन्वेस्ट ZOU!
3) नोडल अधिकारी, बजट एलाटमेंट, औद्योगिक विकास विभाग, उ0प्र0 शासन।
4) निदेशक, वित्तीय सांख्यकीय निदेशालय, जवाहर भवन, लखनऊ।
5) वित्त (आय-व्ययक) अनुभाग-/4
6) वित्त (व्यय-नियंत्रण) अनुभाग-6
7) नियोजन अनुभाग-/4
8) औद्योगिक विकास अनुभाग-2
9) गार्ड फाइल।
आज्ञा से,
मनोज कुमार मौर्य
संयुक्त सचिव।
I- Ue शासनादेश इलेक्ट्रानिकली जारी किया गया है, अत: इस पर हस्ताक्षर की आवश्यकता नही है |
2- इस शासनादेश की प्रमाणिकता वेब साइट http://shasanadesh.up.gov.in से सत्यापित की जा सकती है |