GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO. 3925
TO BE ANSWERED ON 12.08.2026
UTILIZATION OF RAILWAY LAND
3925. SHRI MADDILA GURUMOORTHY:
Will the Minister of RAILWAYS be pleased to state:
(a) the details of the steps taken by the Government to redevelop vacant
railway land for commercial and other productive uses with a view to
generating non-fare revenue;
(b) the details of the current status of the redevelopment of railway
stations across the country, including the number of stations
completed, under implementation and proposed for redevelopment;
(c) whether the Government proposes to introduce additional affordable
trains in the non-AC and sleeper categories in the country to cater the
growing demand for economical rail travel;
(d) if so, the details thereof including the proposed routes, categories of
trains and implementation timeline; and
(e) the details of the measures taken by the Government to prevent and
remove illegal encroachments on railway land including the extent of
railway land retrieved during the last three years and current year?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (e) The surplus vacant railway land which is not required by
Railways for its immediate operational needs is entrusted to Rail Land
Development Authority for commercial development, wherever feasible.
Feasibility study is carried out through a reputed architect, marketing and
valuation consultant by RLDA. For commercially viable land parcels, open
competitive bids are invited and the highest bidder is awarded the site for
Β§ Page 1 of 12commercial development. The vacant railway land is also utilized for
infrastructural development viz., Multi Tracking, Railway Workshops, New
Passenger Terminals, Cargo Terminals, etc., as per railwayβs operational
needs.
Railways carry out regular surveys and take action for their removal. In
case of encroachments of temporary nature (soft encroachments) in the
shape of jhuggies, jhopris and squatters, the same are removed in
consultation and with the assistance of Railway Protection Force and local
civil authorities. For old encroachments which are in the form of pucca
structures (hard encroachment), where party is not amenable to
persuasion, action is taken under Public Premises (Eviction of Unauthorized
Occupants) Act, 1971 (PPE Act, 1971), as amended from time to time.
Actual eviction of unauthorized occupants is carried out with the
assistance of State Government and local administration/police. Removal
of encroachments by Railways is a continuous process. During the last
three years, about 63.79 ha of railway land has been reclaimed from
encroachments.
Station Redevelopment:
Ministry of Railways has launched Amrit Bharat Station Scheme for
redevelopment of stations with a long-term approach.
The scheme involves preparation of master plans and their implementation
in phases to improve the stations of Indian Railways. The master planning,
keeping in view the necessity of each station, includes:
ο· Improvement of access to station and circulating areas
ο· Integration of station with both sides of city
ο· Improvement of station building
Page 2 of 12ο· Improvement of waiting halls, toilets, sitting arrangement, water
booths
ο· Provision of wider foot over bridge/subway to commensurate with
passenger traffic
ο· Provision of lifts/escalators/ramps
ο· Improvement of platform surface and provision of platform shelter
ο· Provision of kiosks for local products through schemes like 'One
Station One Productβ
ο· Parking development
ο· Amenities for Divyangjans
ο· Better passenger information systems
ο· Provision of air concourse, executive lounges, Multimodal integration,
landscaping, etc.
The scheme also envisages sustainable and environment friendly solutions
etc. as per necessity, phasing and feasibility and creation of city centre at
the station in the long term.
So far, 1,340 stations have been identified for development under Amrit
Bharat Station Scheme, out of which 261 stations have been completed,
work at the balance stations are at different stages of
execution/tendering/master planning. The names of stations completed are
as under:
Aishbagh Junction, Alnavar, Amb Andaura, Ambasamudram, Ambikapur,
Amgaon, Anandpur Sahib, Anara, Angamali for Kaladi, Ashoknagar, Ayodhya
Dham Junction, Bachhrawan, Badami, Bagalkot, Baheri, Baijnath Paprola,
Balaghat, Balangir Balod, Balrampur, Banmankhi, Bantawala, Barabhum,
Baramati, Bareilly City, Baripada, Barmer, Barpali, Begumpet, Beohari,
Bhaktinagar, Bhanupratappur, Bhilai, Bhind, Bijnor, Bimalgarh, Bommidi,
Bundi, Byculla, Chaibasa, Chalakudi, Champa, Chanda Fort, Chandil,
Changanassery, Chennai Park, Chhindwara, Chidambaram, Chinchpokli,
Page 3 of 12Chinna Salem, Chirayinkeezh, Chunar Junction, Coonoor, Cumbum, Cuttack,
Dakor, Daliganj, Dallirajhara, Dauram Madhepura, Dausa, Deeg, Derol,
Deshnoke, Devlali, Dhampur, Dharwad, Dhule, Digha, Dongargarh, Eluru,
Fatehabad, Fatehnagar, Fatehpur, Fatehpur Shekhawati, Ferok, Gadag,
Gangapur City, Garbeta, Gauriganj Giridih, Godda, Godhra Junction,
Gogameri, Gokak Road, Gola Gokarnath, Gomtinagar, Gotan, Govardhan,
Govind Garh, Govindpur Road, Govindpuri, Guruvayur, Hafizpet, Haibargaon,
Haldia, Haldibari, Hapa, Harpalpur, Harrawala, Hathras City, Hi-Tech City,
Himayatnagar, Hodal, Hosapete, Idgah Agra Junction, Izzatnagar,
Jaisalmer, Jalandhar Cantonment Junction, Jalpaiguri Road, Jam Jodhpur,
Jam Wanthali, Jangaon, Jind Junction, Joychandi Pahar Junction, Junnor
Deo, Kahalgaon, Kakinada Town Junction, Kalka, Kalyani Ghoshpara,
Kamakhyaguri, Kanalus Junction, Karaikkudi Junction, Karamsad,
Karimnagar, Katni South, Katrasgarh, Kedgaon, Kesinga, Khairthal,
Khalilabad, Khambhaliya, Khariar Road, Koppal, Kosamba Junction,
Kotdwar, Kulitturai, Kuttippuram, Lasalgaon, Limbdi, Lohardaga, Lonand
Junction, Madhupur Junction, Mahbubabad, Mahe, Mahuva, Mailani
Junction, Majbat, Malkapur, Mambalam, Manaparal, Mandal Garh,
Mandawar Mahwa Road, Mandi Dabwali, Mangalagiri, Mannargudi, Matunga,
Mavelikara, MCS Chhatarpur, Mithapur, Modinagar, Mohanlalganj, Morappur,
Morbi, Muktsar, Munirabad, Muri Junction, Murtizapur Junction, Nainpur
Junction, Namakkal, Nandura, Narmadapuram, Narwana Junction, Netaji
Subhash Chandra Bose Itwari Junction, Nidadavolu Junction, Nilambur
Road, Okha, Orai, Orchha, Pakur, Palani, Palitana, Panagarh, Panki Dham,
Paramakkudi, Parappanangadi, Parel, Parlakhemundi, Phaphamau Junction,
Pirpainti, Piska, Pokhrayan, Pollachi Junction, Polur, Porbandar,
Pratapnagar, Prayag Junction, Raj Nandgaon, Rajgarh, Rajmahal, Rajula
Junction, Ramagundam, Ramgarh Cantonment, Ramghat Halt, Ranibennur,
Rayanapadu, Sabaur, Saharanpur Junction, Sahibganj, Salempur,
Page 4 of 12Samakhiyali, Samalpatti, Sanchi, Sankarpur, Sarona, Sahibzada Ajit Singh
Nagar Mohali, Savda, Seoni, Shahad, Shajapur, Shamli, Shivanarayanpur,
Shivpuri, Sholavandan, Shoranur Junction, Shridham, Siddharth Nagar,
Sihor Junction, Simultala, Siuri, Sojat Road, Somesar, Sri Bala
Brahmeswara Jogulamba, Srirangam, Srivilliputtur, St. Thomas Mount,
Subramanya Road, Sullurpeta, Suraimanpur, Swaminarayan Chappia,
Talcher, Tamluk, Tanakpur, Thalassery, Thawe, Thiruvarur Junction,
Tikamgarh, Tirur, Tiruvannamalai, Tripunithura, Tuni, Udagamandalam,
Ujhani, Urkura, Utran, Vadakara, Vadala Road, Vidisha, Vindhyachal,
Vriddhachalam Junction, Wadakancheri, Warangal.
The activities for development at other stations have also been taken up at
good pace and progress of some of the stations is as below:
ο· Bhubaneswar station: The works of new West side and East side
station building, air concourse, elevated driveway at West and East
side and extension of foot over bridge have been completed. The
works of improvement of platform surface, improvement of circulating
area, platform shelters, lifts and escalators have been taken up.
ο· Chhatrapati Sambhajinagar station: The works of new post office
building and parcel office, new Railway Protection Force and
Government Railway Police building at North side have been
completed. The works of the new arrival and departure building at
South side, new waiting hall, toilet, air concourse, 6 m wide foot over
bridge, through roof, new underground tanks at North and South
sides, new sewage treatment plant at North and South side, and new
electrical sub station building have been taken up.
ο· Gaya station: The work of the new arrival building at the second entry
has been completed. The works of the new departure building at
second entry, new arrival and departure building at main entry, new
Page 5 of 12platform no. 8, new platform shelters, air concourse and improvement
of circulating area have been taken up.
ο· Nagpur Junction station: The works of relocation of passenger
reservation system building and booking offices, and improvement of
parking on the main entry side have been completed. The works of
the new administrative building, departure building and basement
parking on main entry side, departure building and unified basement
on second entry side, new air concourse, improvement of platform
surface at platform no. 8 and new platform shelters have been taken
up.
ο· Rameswaram station: The works of revamping Multi Functional
Complex building into retiring rooms, structural works of East and
North terminal building, parcel office, departure forecourt, arrival
forecourt, substation building and sewage treatment plant have been
completed. The finishing works of East terminal building, North
terminal building, departure forecourt, sewage treatment plant, arrival
forecourt, platform shelter and improvement of waiting hall have been
taken up.
ο· Tirupati station: The structural works of new South side station
building (G+3+Basement), structural works of new North side station
building, air concourse, underground and overhead water tanks,
sewage treatment plant, rainwater harvesting, ramp to foot over
bridge, lifts and escalators have been completed. The finishing works
of station buildings, connecting bridge, approach road and platform
shelters have been taken up.
Further, development / redevelopment / upgradation / modernisation of
stations on Indian Railways is a continuous and ongoing process and works
in this regard are undertaken as per requirement, subject to inter-se
priority and availability of funds. Development /redevelopment / upgradation
Page 6 of 12/ modernisation of a station is carried out based on the category of
station/condition/traffic handled etc.
Non A/C (General & Sleeper coaches):
With a view to meet the demand of passengers travelling in unreserved
coaches, Indian Railways have significantly increased the facilities for
passengers demanding general class travel. During the financial year 2024-
25 alone, 1250 general coaches have been utilised in various long-distance
trains to have at least 4 general class coaches. Similarly, during the year
2025-26 about 870 Coaches including 160 General Class coaches have
been utilised for permanent augmentation.
To cater to the travel demand of the low and middle income families, Indian
Railways have taken up manufacturing of 17,000 non-AC coaches
(general/sleeper) over the next 5 years.
On IR, the percentage of non-AC coaches, is about 70% as indicated below:
Table 1: Distribution of coaches:
Non-AC coaches (general and sleeper) ~62,000 ~70%
AC coaches ~27,000 ~30%
Total coaches ~89,000 100%
Table 2: Distribution of seats:
Non-AC seats ~ 54 lakhs ~ 78%
AC seats ~ 15 lakhs ~ 22%
Total ~ 69 lakhs 100%
Page 7 of 12Table 3: Passengers in general/unreserved coaches:
Year No. of Passengers
2020-21 99 Cr (Covid year)
2021-22 275 Cr (Covid year)
2022-23 553 Cr
2023-24 609 Cr
2024-25 651 Cr
2025-26 681 Cr
Moreover, to provide greater accommodation for the passengers using
General and non-AC Sleeper Coaches, the extant policy regarding
composition of Mail/Express trains provides for 12 (Twelve) General class &
Sleeper class non- AC coaches and 08 (eight) AC-Coaches, in a train of 22
coaches, thereby providing greater accommodation for the passengers
using General and non-AC Sleeper Coaches.
Further, to cater to the needs of passengers desirous of availing
unreserved accommodation, Indian Railways (IR) operate unreserved non-
AC passenger trains/ MEMU / EMU etc. for affordable travel, which are in
addition to the unreserved accommodation (coaches) available in
Mail/Express services.
Special Trains
IR also operates Special train services during festivals, holidays, etc. to
cater to the extra needs of passengers and supplement the accommodation
available by regular services.
Page 8 of 12Accordingly, the number of Special trains operated across the Indian
Railways network, to facilitate the passengers during Summer/winter
vacations, festivals like Holi, Durga Puja, Diwali, Chhath, Christmas,
Sabrimala, Id-ul-fitr etc. are as below:
Year No. of trips
2023-24 ~40,500
2024-25 ~85,400
2025-26 ~80,500
To provide affordable means of transportation to the low and middle
income families, Indian Railways have introduced Amrit Bharat services
that are fully non-AC modern trains. The present composition of Amrit
Bharat consists of 11 General Class coaches, 8 Sleeper Class coaches, 01
Pantry Car and 02 Luggage cum Divyangjan coaches.
High Speed and enhanced Safety standards are the hallmarks of these
trains with following enhanced features and amenities:
β Better aesthetics of seat and berths with enhanced look & feel on the
lines of Vande Bharat Sleeper.
β Jerk Free Semi-Automatic Couplers.
β Improved Crashworthiness in coaches by provision of crash tube.
β Provision of CCTV system in all coaches.
β Improved designs of toilets.
β Improved design of Ladder for ease of climbing on to the berth.
β Improved LED Light fitting & Charging Sockets.
β Provision of EP assisted braking system.
β Aerosol based fire suppression system in toilets and electrical
cubicles.
β USB Type-A and Type-C mobile charging sockets.
Page 9 of 12β Emergency Talk Back system for two-way communication between
Passenger and Guard/Train Manager.
β Non-AC pantry with enhanced heating capacity.
β Fully sealed gangways with quick release mechanism for easy
attachment and detachment.
As on 05.08.2026, the following 36 pairs of Amrit Bharat Express services
are being operated on the Indian Railways network:
SN Train No. and Name
1 11015/11016 Lokmanya Tilak (T) - Saharsa Amrit Bharat Express
2 13697/13698 Gaya - Delhi Amrit Bharat Express
3 15293/15294 Muzaffarpur - Charlapalli Amrit Bharat Express
4 15557/15558 Darbhanga - Anand Vihar (T) Amrit Bharat Express
5 15561/15562 Darbhanga - Gomtinagar Amrit Bharat Express
6 15567/15568 Bapudham Motihari - Anand Vihar (T) Amrit Bharat
Express
7 22361/22362 Rajendranagar (T) - New Delhi Amrit Bharat Express
8 13433/13434 SMVT Bengaluru - Malda Town Amrit Bharat Express
9 13435/13436 Malda Town - Gomtinagar Amrit Bharat Express
10 15133/15134 Chhapra - Anand Vihar (T) Amrit Bharat Express
11 14047/14048 Sitamarhi - Delhi Amrit Bharat Express
12 14627/14628 Saharsa - Chheharta Amrit Bharat Express
13 19623/19624 Madar - Darbhanga Amrit Bharat Express
14 16601/16602 Erode - Jogbani Amrit Bharat Express
Page 10 of 1215 19021/19022 Udhna - Brahmapur Amrit Bharat Express
16 15671/15672 Kamakhya - Rohtak Amrit Bharat Express
17 20609/20610 New Jalpaiguri - Tiruchchirappalli Amrit Bharat
Express
18 16597/16598 SMVT Bengaluru - Alipurduar Amrit Bharat Express
19 11031/11032 Panvel - Alipurduar Amrit Bharat Express
20 16107/16108 Tambaram - Santragachi Amrit Bharat Express
21 13065/13066 Howrah - Anand Vihar (T) Amrit Bharat Express
22 22587/22588 Sealdah - Banaras Amrit Bharat Express
23 20603/20604 New Jalpaiguri - Nagercoil Amrit Bharat Express
24 15949/15950 Dibrugarh - Gomti Nagar Amrit Bharat Express
25 16121/16122 Tambaram - Thiruvananthapuram Central Amrit
Bharat Express
26 16329/16330 Nagercoil - Mangaluru Amrit Bharat Express
27 17041/17042 Charlapalli - Thiruvananthapuram North Amrit Bharat
Express
28 16619/16620 Podanur-Dhanbad Amrit Bharat Express
29 16357/16358 Nagercoil-Charlapalli Amrit Bharat Express
30 15673/15674 Charlapalli - Kamakhya Amrit Bharat Express
31 17065/17066 Charlapalli - Shalimar Amrit Bharat Express
32 22589/22590 Banaras- Hadapsar Amrit Bharat Express
33 22111/22112 Lokmanya Tilak(T)- Ayodhya Amrit Bharat Express
34 14663/14664 Amritsar- New Jalpaiguri Amrit Bharat Express
Page 11 of 1235 19725/19726 Khatipura- Darbhanga Amrit Bharat Express
36 11431/11432 Pune - Danapur Amrit Bharat Express
Besides, introduction of new train services, including Amrit Bharat services,
to cater to various routes/sections, is an on-going process, which depends
on various factors including:
β Capacity of that section
β Availability of path
β Availability of required rolling stock
β Availability of matching infrastructure for rolling stock
β Maintenance requirement of railway tracks and other assets
β Occupancy and the traffic requirement of the section
*****
Page 12 of 12