**Executive Summary**
This document is a notification from the Ministry of Railways, declaring the acquisition of land for the construction of the 4th line between Dadhapara and Belha (9.20 km) in Chhattisgarh. It states that the Central Government intends to acquire specific land, as described in the schedule, under Section 20E of the Railway Act, 1989. The notification is effective upon publication in the Official Gazette, at which point the land vests absolutely in the Central Government, free from all encumbrances.
**Key Points / Main Content**
* **Land Acquisition Declaration:**
* The Central Government declares its intention to acquire land for the construction of the 4th line between Dadhapara-Belha.
* This project is within the South East Central Railway (9.20 km) in Chhattisgarh.
* **Previous Notifications:**
* An earlier notification (S.O. 3964(E), dated 29th August 2025) announced the intention to acquire land for this project.
* The substance of the notification was published in local newspapers on September 13, 2025.
* **No Objections:**
* No objections were received by the Competent Authority regarding the land acquisition.
* **Report Submission:**
* The Competent Authority has submitted its report to the Central Government as per Section 20E of the Railway Act, 1989.
* **Vesting of Land:**
* Upon publication of this notification, the land specified in the schedule will vest absolutely in the Central Government, free from all encumbrances.
* **Schedule of Land:**
* The schedule provides a detailed description of the land to be acquired in Belha Village, Bilaspur District, Chhattisgarh, including:
* Village Name: Belha
* Tehsil Name: Belha
* District Name: Bilaspur
* State Name: Chhattisgarh
* Khasra Number (275, 276/2, 277+278, 279/6, 279/8, 279/9, 281/3)
* Type of Land (Non-irrigated, Diverted)
* Nature of Land (Padat, Residential converted, Commercial converted)
* Acquired Area in Hectare (Total: 0.4650 hectare)
* Name of Land Owner
**Impact Analysis**
**Land Owners:**
* **Impact:** Land owners are impacted by the land acquisition. They will lose ownership of the land listed in the schedule.
* **Action Required:** Land Owners will have their land vest absolutely in the Central Government free from all encumbrances.
**Ministry of Railways / South East Central Railway:**
* **Impact:** Gaining the required land.
* **Action Required:** Proceed with project.
Key Entities Referenced
Railway Act, 1989: The main law under which the land acquisition is being carried out.
Section 20E of the Railway Act, 1989: The section of the Railway Act that outlines the process for declaring land acquisition for railway projects.
South East Central Railway: The railway zone responsible for the project.
Chhattisgarh: The state where the land acquisition is taking place.
Dadhapara-Belha 4th Line Project: The railway project requiring land acquisition.
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99
सी.जी.-सी.जी.-अ.-22122025-268735
CG-CGxx-xEG-I2D2H1x2x2x0 25-268735
xxxGIDExxx
असाधारण
EXTRAORDINARY
भाग II—खण् ड 3—उप-खण्ड (ii)
PART II—Section 3—Sub-section (ii)
प्राजधकार स ेप्रकाजित
PUBLISHED BY AUTHORITY
स.ं 5755] नई दिल्ली, सोमवार, दिसम्ब र 22, 2025/पौष 1, 1947
No. 5755] NEW DELHI, MONDAY, DECEMBER 22, 2025/PAUSHA 1, 1947
jsy ea=ky;
¼nf{k.k iwoZ e/; jsy os½
अजधसचू ना
fcykliqj] 19 fnlEcj] 2025
jsy vf/kfu;e] 1989 dh /kkjk 20 ³ ds varxZr lwpu k
dk-vk- 5952¼v½.—dsUnzh; ljdkj u s jys vf/kfu;e] 1989 ¼1989 dk 24½ ¼ftlds Ik'pkr ~ vf/kfu;e dgk x;k gS½
dh /kkjk 20d dh mi/kkjk ¼1½ ds v/khu tkjh] Hkkjr ds jkti=] vlk/kkj.k] Hkkx II [k.M 3] mi[k.M (ii), rkjh[k 29 vxLr
2025 eas izdkf'kr] Hkkjr ljdkj ds jys e=a ky; ¼jys os cksMZ½ dh vf/klwpuk la[;k dk vk- 3964 ¼v-½ }kjk mDr vf/klwpuk ls
mikc) vuqlwph eas fofufnZ’V dks NRrhlx<+ jkT; ds fy, nk/kkikjk & csYgk ¼9-20 fd-eh-½ pkSFkh ykbZu ifj;kstuk dk fuekZ.k
gSA ifj;kstuk ds fu’iknu] vujq {k.k] izca/k vkSj izpkyu ds iz;kstu ds fy, vftZr dju s ds viu s vk'k; dh ?kks"k.kk dh FkhA
vkSj mDr vf/klwpuk dk lkj] mDr vf/kfu;e fd /kkjk 20 ¼d½ dh mi/kkjk ¼4½ ds v/khu nSfud LFkkuh; lekpkj i=ks]a
vFkkZr gfjHkfwe ¼fcykliqj laLdj.k½] ubZ nqfu;k ¼fcykliqj laLdj.k½ ,oa VkbZel vkQ bafM;k ¼jk;iqj laLdj.k½] rkjh[k
13 flracj] 2025 dks çdkf'kr dj fn;k x;k FkkA
vkSj l{ke çkf/kdkjh }kjk dksbZ vk{ksi izkIr ugha gqvkA
vkSj l{ke çkf/kdkjh us mDr vf/kfu;e dh /kkjk 20 ¼³½ fd mi/kkjk ¼1½ ds vuqlj.k eas viuh fjiksVZ lkSai nh gSA
vr% vc] dsUæh; ljdkj]l{ke çkf/kdkjh ls fjiksVZ izkIr gksus ij vkSj mDr vf/kfu;e dh /kkjk 20¼M-½ dh mi /kkjk ¼1½
}kjk iznRr 'kfDr;ks a dk iz;ksx djrs gq,] ;g ?kks"k.kk djrh gS fd mikc) vuqlwph Hkwfe fofufnZ"V Hkwfe iqoksZDr iz;kstu ds fy,
vftZr dh tk,xhA
8615 GI/2025 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
vr% ;g fd dsUnzh; ljdkj mDr vf/kfu;e dh /kkjk 20 ¼³½ fd mi/kkjk ¼2½ ds vuqlj.k eas ;g ?kks"k.kk djrh gS fd
bl vf/klwpuk eas jkti= eas izdkf'kr gksus ij blls mikc) vuqlwph eas fofufnZ"V Hkwfe lHkh foYyaxeksa ls eqDr gksdj dsUnzh;
ljdkj es a vkR;afrd :Ik ls fufgr gks tk,xhA
vuqlwp h
nf{k.k iwoZ e/; jsyos ds varxZRk NRrhlx<+ jkT; esa fLFkr nk/kkikjk & c-s2Y0g fkd ¼-e9h-½ pkSFkh ykbZu
ifj;kstuk dk fuekZ.k gS] fcykliqj ftys ds fy,] vf/kxzg.k fd;s tkus ds fy, lajpuk ds lfgr ;k muds jfgr
Hkwfe dk laf{kIr fooj. k&
xzke & fcYgk ] rglhy & fcYgk] ftyk & fcykliqj] jkT; & NRrhlx<+
dzekad rglhy xzke dk [kljk Hkwfe dk Hkwfe dh vftZr Hkwfe dk Hkwfe dk Lokeh dk u ke
la[;k dk uke uke ua- izdkj izd`fr {ks=Qy ¼gsDVs;j
es a½
fcYgk fcYgk vflafpr iM+r efLtn fcYgk lokjkZdkj
1 275 0.0610
ftyk/;{k fcykliqj
fcYgk fcYgk ifjofrZr vkoklh;
276@2 0.0900 fdj.k jys okuh ifr lrh'k
ifjofrZr
2 mQZ f[k;kynkl jsyokuh
277 + ifjofrZr O;olkf;d tkfr flU/kh
0.0920
278 ifjofrZr
fcYgk fcYgk vflafpr iM+r >qeqdyky ;kno firk
3 279@6 0.0760
thojk[ku ;kno
fcYgk fcYgk vflafpr iM+r tfru xks;y firk jfoUnz
4 279@8 0.0490
xks;y
5 fcYgk fcYgk 279@9 vflafpr iM+r 0.0490 lqfer firk lhrkjke xqIrk
fcYgk fcYgk vflafpr iM+r vfiZr vxzoky firk euh"k
6 281@3 0.0480
dqekj vxzoky
dqy ;ksx 0-4650 gsDVs; j
dqy ;ksx & 0-4650 gsDVs; j
[Qk- la- &Mh-lh-bZ-II@dkWu@vkj@pkSFkh ykbZu@nk/kkikjk & fcYgk @20b]
fot; dqekj lkgw] eq[; iz'kklfud vf/kdkjh ¼fuekZ.k½
MINISTRY OF RAILWAYS
(South East Central Railway)
NOTIFICATION
Bilaspur, the 19th December, 2025
Notice under Section 20E of the Railway Act, 1989
S.O. 5952(E).—Whereas, by the notification of the Government of India in the Ministry of Railways (South
East Central Railway), number S.O. 3964(E), dated 29th August 2025 the published in the Gazette of India,
Extraordinary, Part-ii, section 3, Sub-section (ii), and issued under sub- section (1) of section 20A of the Railways
Act, 1989 (24 of 1989) (herein after referred as the said Act), the Central Government declared its intention to acquire
the land in the schedule annexed to the said notification for the purpose of execution, maintenance, management and
operation of the Special Railway Project namely “Construction of 4th line between Dadhapara-Belha of South East
Central Railway (9.20 Km)” in the state of Chhattisgarh, hereby declares its intention to acquire such land.
And whereas, the substance of the said notification has been published in the daily local newspapers, namely,
Haribhumi (Bilaspur Edition), Nai Duniya (Bilaspur Edition) & Times of India (Raipur Edition), of dated 13.09.2025,
under sub-section (4) of section 20A of the said Act,
And whereas, no objection has been received by the Competent Authority;
And whereas, in pursuance of sub-section (1) of section 20E of the said Act, the Competent Authority has
submitted its report to the Central Government.[भाग II—खण् ड 3(ii)] भारत का रािपत्र : असाधारण 3
Now therefore, upon receipt of the report of the Competent Authority and in exercise of the powers conferred
by sub- section (1) of section 20E of the said Act, the Central Government hereby declares that the land specified in
the Schedule annexed hereto shall be acquired for the aforesaid purpose.
And further, in the pursuance of sub-section (2) of section 20E of the said Act, the Central Govt. hereby
declares that on publication of the notification in the Official Gazette, the land specified in the Schedule annexed
hereto shall vest absolutely in the Central Government free from all encumbrances.
SCHEDULE
Brief description of the land to be acquired with or without structure for the Special Railway Project namely
Construction of 4th line between “Dadhapara-Belha of South East Central Railway (9.20 Km)” in Bilaspur
District in the state of Chhattisgarh.
Village- Belha Tehsil: Belha District: Bilaspur State- Chhattisgarh
SN Tehsil Name Khasra Type of Nature of Acquired Name of Land
of Number land land area in Owner
Village hectare
1 2 3 4 5 6 7 8
1 Belha Belha 275 Non Padat 0.0610 Maszid belha
irrigated swarwakar jila
adhyaksh bilaspur.
2 Belha Belha 276/2 Diverted Residential Kiran Railwani
0.0900
converted husband satish Urf
277+278 Diverted Commercial khayaldas railwani
0.0920
converted cast sindhi.
3 Belha Belha Non Padat Jhumuklal yadav
279/6 irrigated 0.0760 father jivrakhan
yadav.
4 Belha Belha Non Padat Jatin goyal father
279/8 0.0490
irrigated ravindra goyal.
5 Belha Belha Non Padat Sumit father
279/9 0.0490
irrigated sitaram gupta.
6 Belha Belha Non Padat Arpit Agrawal
281/3 irrigated 0.0480 father Manish
kumar Agrawal.
Total 0.4650 hectare
Grand Total – 0.4650 hectare
[F. No. DCE-II/Con/R/4th line/Dadhapara-Belha /20E]
VIJAY KUMAR SAHU, Chief Administrative Officer (Construction)
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.