Home India Ministry of Railways 7A Publication regarding Construction of Road Over Bridge in...
Date: 2025-04-25 Category: Extra Ordinary State: Union Government Country: India

7A Publication regarding Construction of Road Over Bridge in lieu of Level Crossing No 69(M) at Km 397/24 26 in between Yelgur and Nekonda stations

Issued by Ministry of Railways · Construction Department

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

## Policy Analysis Report: Gazette of India Notification on Land Acquisition for Railway Project **1. Executive Summary:** This report analyzes a notification published in the Gazette of India, dated April 25, 2025, pertaining to land acquisition for a specific railway project under the Railways Act, 1989. The notification designates the Revenue Divisional Officer, Warangal, as the Competent Authority for Land Acquisition for the "Construction of Road Over Bridge in lieu of Level Crossing No. 69M at Km. 3972426 in between Yelgur and Nekonda stations" project in the Warangal district of Telangana. The core purpose is to authorize a specific officer to facilitate land acquisition for the efficient execution of the railway infrastructure project. **2. Introduction:** This report aims to provide a detailed overview and analysis of the Gazette of India notification concerning land acquisition for a railway project, based solely on the information presented in the provided text. The report identifies key aspects of the notification, including its objective, provisions, stakeholders, and potential impact. **3. Policy Overview:** * This appears to be a new policy instantiation rather than an amendment of a prior policy. * **Core Objective:** To authorize a specific officer, the Revenue Divisional Officer, Warangal, to act as the Competent Authority for Land Acquisition in respect of a specific railway project in Telangana. **4. Background and Rationale:** As a new policy instantiation for this project, the notification addresses the need to acquire land for the construction of railway infrastructure. Based on the description of the project - "Construction of Road Over Bridge in lieu of Level Crossing No. 69M at Km. 3972426 in between Yelgur and Nekonda stations" - the policy likely addresses issues related to safety, efficiency, and traffic congestion at existing level crossings. Replacing a level crossing with a road over bridge improves safety for both road and rail traffic and reduces delays. **5. Key Provisions / Changes:** This is a New Policy Instantiation, therefore the following applies: The main provision of this notification is the designation of the Revenue Divisional Officer, Warangal, as the "Competent authority for Land Acquisition" for the specified railway project. This means that the Revenue Divisional Officer is authorized to perform functions related to land acquisition under the Railways Act, 1989, specifically clause 7A of Section 2, to enable the project's execution. The project involves the construction of a Road Over Bridge in Telangana's Warangal district. The notification also specifies the project details and location which provides a precise scope for the Competent Authority's responsibilities. **6. Target Audience and Stakeholders:** The primary target audience and stakeholders directly affected by this notification include: * **Landowners in the Warangal district, Telangana:** Those whose land falls within the project area will be directly impacted by the land acquisition process. * **Residents of Warangal and rail commuters:** They will benefit from the improved railway infrastructure and safety enhancements resulting from the Road Over Bridge. * **South Central Railway:** The railway division responsible for the project's execution. * **Revenue Divisional Officer, Warangal:** The designated authority responsible for carrying out the land acquisition process. * **Contractors and construction workers:** In the long-term they will be involved in the construction of the Road Over Bridge. **7. Implementation Aspects (Inferred):** * **Responsible Agency:** The Revenue Divisional Officer, Warangal, is the primary responsible agency for land acquisition. The South Central Railway is also involved. * **Procedures:** While the notification itself does not detail the land acquisition procedures, it implies that the process will follow the guidelines outlined in the Railways Act, 1989, and relevant land acquisition laws. * **Timelines:** The notification takes effect from the date of its publication in the Official Gazette (April 25, 2025), implying that the land acquisition process can commence immediately. There are no further explicit timelines mentioned. **8. Expected Outcomes / Impact of Changes:** The intended outcomes of this notification include: * **Efficient Land Acquisition:** By designating a Competent Authority, the notification aims to streamline the land acquisition process, reducing delays and facilitating project execution. * **Improved Railway Infrastructure:** The construction of the Road Over Bridge will improve railway infrastructure, enhancing safety and reducing traffic congestion at the level crossing. * **Enhanced Connectivity:** The Road Over Bridge will improve connectivity and accessibility for both road and rail users. **9. Conclusion:** The Gazette of India notification designates the Revenue Divisional Officer, Warangal, as the Competent Authority for Land Acquisition for the "Construction of Road Over Bridge in lieu of Level Crossing No. 69M at Km. 3972426 in between Yelgur and Nekonda stations" project in Warangal, Telangana. This notification is significant as it enables the South Central Railway to proceed with the project by facilitating the necessary land acquisition process, ultimately contributing to improved railway infrastructure, safety, and connectivity in the region. The effectiveness of the policy will depend on the efficient and equitable implementation of the land acquisition process by the designated authority, ensuring compliance with relevant laws and regulations.

Key Entities Referenced

Railways Act, 1989: Act under which the Central Government is exercising its powers. Central Government: The government body authorizing the officer to perform functions related to land acquisition. Section 2: Section of the Railways Act, 1989 S.O. 1860E: Notification number related to land acquisition. MINISTRY OF RAILWAYS: Government organization issuing the notification. South Central Railway: Railway zone under the Ministry of Railways. "Construction of Road Over Bridge in Telangana Warangal Revenue Divisional Officer, lieu of Level Crossing No. 69M at Km. 3972426 in between Yelgur and Nekonda stations": Special Railway Project for which land is being acquired.
Official Source Record View Original Source →
See Full Document Text
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99 सी.जी.-टी.एल.-अ.-25042025-262677 CG-TLxx-xEG-I2D5H0x4x2x0 25-262677 xxxGIDExxx असाधारण EXTRAORDINARY भाग II—खण् ड 3—उप-खण्ड (ii) PART II—Section 3—Sub-section (ii) प्राजधकार स ेप्रकाजित PUBLISHED BY AUTHORITY स.ं 1827] नई ददलली, िुक्रवार, अप्रलै 25, 2025/वैिाख 5, 1947 No. 1827] NEW DELHI, FRIDAY, APRIL 25, 2025/VAISAKHA 5, 1947 रेल मत्रं ालय (दजिण मध्य रेलव)े अजधसचू ना जसकंदराबाद, 23 अप्रैल, 2025 का.आ. 1860(अ).—केंद्र सरकार, रेलवे अजधजनयम, 1989 की धारा 2 के खंड (7क) द्वारा प्रदत्त िजियों का प्रयोग करते हुए, एतद्द्वारा नीचे दी गई ताजलका के कॉलम (5) में उजललजखत अजधकारी को आजधकाररक रािपत्र में इस अजधसूचना के प्रकािन की तारीख से उि ताजलका के कॉलम (3) में उजललजखत राज्य में जनष्पादन, रखरखाव, प्रबंधन और संचालन के जलए ताजलका के कॉलम (2) में उजललजखत जविेष रेलवे पररयोिना के संबंध में सिम प्राजधकारी के कायों को जनष्पाददत करने के जलए प्राजधकृत करती है. ताजलका क्र.सं. जविेष रेलवे पररयोिना राज्य जिला भूजम अजधग्रहण के जलए सिम प्राजधकारी (1) (2) (3) (4) (5) 1. येलगुर और नेकोंडा में दकमी 397/24-26 पर तेलंगाना वरंगल रािस्ट्व मंडल अजधकारी, समपार फाटक सं. 69(एम) के स्ट्थान पर वरंगल ऊपरी सड़क पुल का जनमााण [फा. सं. DYCE/CON/RSP/ROB/LAND AQ/2025/7A/120] मनोि कुमार, मुख्य इंिीजनयर/सी/ आरएसपी 2737 GI/2025 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] MINISTRY OF RAILWAYS (South Central Railway) NOTIFICATION Secunderabad, the 23rd April, 2025 S.O. 1860(E).—In exercise of the powers conferred by clause (7A) of Section 2 of the Railways Act, 1989 the Central Government hereby authorizes the officer mentioned in the column (5) of the Table below to perform the functions of the Competent Authority for Land Acquisition in respect of the Special Railway Project as mentioned in column (2) of the Table for execution, maintenance, management and operation in the state mentioned in column (3) of the said table with effect from the date of publication of this notification in the Official Gazette. TABLE Sl.No. Special Railway Project State District Competent authority for Land Acquisition (1) (2) (3) (4) (5) 1. "Construction of Road Over Bridge in Telangana Warangal Revenue Divisional Officer, lieu of Level Crossing No. 69(M) at Km. Warangal 397/24-26 in between Yelgur and Nekonda stations" [F. No. DYCE/CON/RSP/ROB/LAND AQ/2025/7A/120] MANOJ KUMAR, Chief Engineer/C/RSP Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.