Home India Ministry of Railways 7A Publiction for Construction of Road Over Bridge in lieu o...
Date: 2025-04-17 Category: Extra Ordinary State: Union Government Country: India

7A Publiction for Construction of Road Over Bridge in lieu of Level Crossing in Khammam district in Telangana state

Issued by Ministry of Railways · Construction Department

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

## Report on Railway Land Acquisition Policy Notification **1. Executive Summary:** This report analyzes a notification from the Ministry of Railways, South Central Railway, published in the Gazette of India on April 17, 2025. The notification authorizes specific officers to act as the Competent Authority for Land Acquisition for various Special Railway Projects, specifically concerning the construction of Road Over Bridges (ROBs) in lieu of Level Crossings within the state of Telangana. The report details the specific provisions of the notification, identifies affected stakeholders, and infers potential outcomes of the implementation of this policy. This is a new policy announcement related to land acquisition for specific railway projects and not an amendment. **2. Introduction:** The purpose of this report is to provide an informative analysis of a notification published by the Ministry of Railways, South Central Railway, as detailed in the provided text. This report aims to elucidate the policy's objectives, key provisions, affected parties, and likely impact, based solely on the information contained within the notification itself. **3. Policy Overview:** * **Core Objective(s):** The core objective of this policy, as inferred from the text, is to expedite land acquisition processes required for the construction of Road Over Bridges in lieu of existing Level Crossings along specific railway lines in Telangana. This aims to improve railway infrastructure and safety by replacing level crossings with overpasses. **4. Background and Rationale:** * **New Policy:** The notification addresses the need to efficiently acquire land for railway infrastructure projects. The replacement of level crossings with Road Over Bridges is likely driven by safety concerns, traffic congestion, and the broader objective of improving railway network efficiency. Appointing Competent Authorities aims to streamline the land acquisition process, likely addressing past delays or bottlenecks in infrastructure development. **5. Key Provisions / Changes:** * This notification establishes the authority of specified officers to act as the "Competent Authority for Land Acquisition" for specific railway projects within Telangana. * The core provision is the authorization granted to the officer mentioned in column 5 of the table to perform the functions of the Competent Authority for Land Acquisition in respect of the Special Railway Project as mentioned in column 2 of the Table for execution, maintenance, management and operation in the state mentioned in column 3 of the said table with effect from the date of publication of this notification in the Official Gazette. * The notification specifically identifies five distinct "Special Railway Projects," all involving the "Construction of Road Over Bridge in lieu of Level Crossing" at specified locations (Level Crossing numbers and kilometer markings). * For each project, the notification specifies the State (Telangana), the District (Khammam), and identifies the "Special Deputy Collector LA IPT Railways" as the designated "Competent authority for Land Acquisition." **6. Target Audience and Stakeholders:** Based on the text, the primary stakeholders directly affected by this policy are: * **Landowners:** Whose land is required for the construction of the Road Over Bridges. * **Residents and Commuters:** Who will benefit from the improved infrastructure and reduced traffic congestion. * **Ministry of Railways and South Central Railway:** The implementing agencies responsible for the projects. * **Special Deputy Collector LA IPT Railways:** The officers designated as the Competent Authority for Land Acquisition. * **Construction companies:** Involved in the building of the Road Over Bridges **7. Implementation Aspects (Inferred):** * **Responsible agency/bodies mentioned:** Ministry of Railways, South Central Railway, and the Special Deputy Collector LA IPT Railways. * **Timelines or procedures specified:** The notification takes effect from the date of publication in the Official Gazette (April 17, 2025). No specific timelines or procedures for the land acquisition process are detailed in this text, but it can be assumed that standard land acquisition procedures will be followed by the Competent Authority. * **Location of projects** The projects are all to be built in the District of Khammam, Telangana **8. Expected Outcomes / Impact of Changes:** The likely intended outcomes of this policy, based on the notification, are: * **Expedited Land Acquisition:** Streamlining the land acquisition process by designating a specific authority. * **Improved Railway Infrastructure:** Facilitating the construction of Road Over Bridges to replace level crossings. * **Enhanced Safety:** Reducing the risk of accidents at level crossings. * **Reduced Traffic Congestion:** Improving traffic flow by eliminating level crossing closures. * **Increased Efficiency of Railway Operations:** Minimizing delays caused by level crossings. **9. Conclusion:** The notification from the Ministry of Railways, South Central Railway, represents a key step in facilitating infrastructure development by streamlining land acquisition for Road Over Bridge projects in Telangana. By designating specific authorities, the policy aims to expedite the process, leading to improved railway safety, reduced traffic congestion, and enhanced railway operational efficiency. The prompt and effective implementation of this notification is crucial to realizing these expected outcomes.

Key Entities Referenced

Railways Act, 1989: Act cited as the source of authority for the Central Government's authorization. Section 2: Refers to a specific section within the Railways Act, 1989. clause 7A: Refers to a specific clause within Section 2 of the Railways Act, 1989. Central Government: The entity authorizing the officer to perform land acquisition functions. MINISTRY OF RAILWAYS: The Government organization responsible for the notification. SOUTH CENTRAL RAILWAY: The specific railway zone issuing the notification. Special Railway Project: The general category of projects for which land acquisition is being authorized. Telangana: The state where a specific railway project is located. Official Gazette: The official publication where the notification is published. Government of India Press: The printing press responsible for uploading the document. New Delhi110064: Location of Government of India Press. Controller of Publications, Delhi110054: Entity publishing the document.
Official Source Record View Original Source →
See Full Document Text
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99 सी.जी.-टी.एल.-अ.-21042025-262551 CG-TLxx-xEG-I2D1H0x4x2x0 25-262551 xxxGIDExxx असाधारण EXTRAORDINARY भाग II—खण् ड 3—उप-खण्ड (ii) PART II—Section 3—Sub-section (ii) प्राजधकार स ेप्रकाजित PUBLISHED BY AUTHORITY स.ं 1739] नई ददलली, बृहस्ट्प जतवार, अप्रलै 17, 2025/चत्रै 27, 1947 No. 1739] NEW DELHI, THURSDAY, APRIL 17, 2025/ CHAITRA 27, 1947 रेल मत्रं ालय (दजिण मध्य रेलवे) अजधसचू ना जसकंदराबाद, 15 अप्रैल, 2025 का.आ. 1772(अ).—केंद्र सरकार, रेलवे अजधजनयम, 1989 की धारा 2 के खंड (7क) द्वारा प्रदत्त िजियों का प्रयोग करत े हुए, एतद्द्वारा नीचे दी गई ताजलका के कॉलम (5) म ें उजललजखत अजधकारी को आजधकाररक रािपत्र म ें इस अजधसूचना के प्रकािन की तारीख स े उि ताजलका के कॉलम (3) म ें उजललजखत राज्य म ें जनष्पादन, रखरखाव, प्रबधं न और संचालन के जलए ताजलका के कॉलम (2) म ें उजललजखत जविेष रेलव े पररयोिना के संबंध म ें भजू म अजधग्रहण के जलए सिम प्राजधकारी के कायों को जनष्पाददत करने के जलए प्राजधकृत करती ह.ै ताजलका क्र.स.ं जविेष रेलवे पररयोिना राज्य जिला भूजम अजधग्रहण के जलए सिम प्राजधकारी (1) (2) (3) (4) (5) 1. एर्रुपालेम - गंजगनेनी स्ट्टेिनों के बीच त ेलगं ाना ख म्मम स्ट्पेिल जडप्टी कलेक्टर (एलए) दक.मी. 545/4-6 पर जस्ट्ित समपार आ ईपीटी और रेलवे फाटक स.ं 129 (एम) के स्ट्िान पर ऊपरी सड़क पलु का जनमाुण 2592 GI/2025 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 2 बोना कालू – मोटू मारी स्ट्टेिनों के बीच दक.मी. 522/0-2 पर जस्ट्ित समपार फाटक स.ं 120 (एम) के स्ट्िान पर ऊपरी सड़क पलु का जनमाुण 3 चचंतकाजन – बोना काल ू स्ट्टेिनों के बीच दक.मी. 505/27-29 पर जस्ट्ित समपार फाटक स.ं 113(एम) के स्ट्िान पर ऊपरी सड़क पलु का जनमाुण 4 खम्मम - पंददललपलली स्ट्टेिनों के बीच दक.मी. 493/0-02 पर जस्ट्ित समपार फाटक स.ं 107 (एम) के स्ट्िान पर ऊपरी सड़क पलु का जनमाुण 5 पापटपलली और खम्मम म ें दक.मी. 470/2-4 पर समपार फाटक स.ं 95 (एम) के स्ट्िान पर ऊपरी सड़क पुल का जनमाुण [फा. सं. DYCE/CON/RSP/ROB/LAND AQ/2025/7A/116] मनोि कुमार, मुख्य इंिीजनयर/सी/ आरएसपी MINISTRY OF RAILWAYS (SOUTH CENTRAL RAILWAY) NOTIFICATION Secunderabad, the 15th April 2025 S.O. 1772(E).—In exercise of the powers conferred by clause (7A) of Section 2 of the Railways Act, 1989 the Central Government hereby authorizes the officer mentioned in the column (5) of the Table below to perform the functions of the Competent Authority for Land Acquisition in respect of the Special Railway Project as mentioned in column (2) of the Table for execution, maintenance, management and operation in the state mentioned in column (3) of the said table with effect from the date of publication of this notification in the Official Gazette. Table Sl. No. Special Railway Project State District Competent authority for Land Acquisition (1) (2) (3) (4) (5) 1. Construction of Road Over Bridge in lieu of Level Crossing No. 129 (M) at Km. 545/4-6 in between Errupalem- Gangineni stations 2. Construction of Road Over Bridge in lieu of Level Crossing No. 120 Special Deputy Collector (M) at Km. 522/0-2 in between Telangana Khammam (LA) IPT & Railways Bonakalu- Motumari stations 3 Construction of Road Over Bridge in lieu of Level Crossing No. 113(M) at Km. 505/27-29 in between Chintakani-Bonakalu stations[भाग II—खण् ड 3(ii)] भारत का रािपत्र : असाधारण 3 4 Construction of Road Over Bridge in lieu of Level Crossing No. 107 (M) at Km. 493/0-02 in between Khammam- Pandillapalli stations 5 Construction of Road Over Bridge in lieu of Level Crossing No. 95(M) at Km. 470/2-4 in between Papatapalli and Khammam stations [F. No. DYCE/CON/RSP/ROB/LAND AQ/2025/7A/116] MANOJ KUMAR, Chief Engineer/C/RSP Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.

Continue your research