The 99th meeting of the Network Planning Group (NPG), operating under the PM GatiShakti National Master Plan (PMGS NMP), convened to evaluate four infrastructure projects aimed at enhancing multimodal connectivity and logistics efficiency. The projects comprised one road/highway project from the Ministry of Road, Transport & Highways (MoRTH) and three railway projects from the Ministry of Railways (MoR).
The railway projects include:
* **New Broad Gauge (BG) line from Baramulla to Uri (Jammu & Kashmir):** A 40.2 km line connecting five existing stations to provide all-weather rail connectivity, boost tourism, and serve strategic needs near the Line of Control. The line will include 3 Road Under Bridges (RUBs) and 9 Road Over Bridges (ROBs).
* **Doubling of Qazigund to Badgam line (Jammu & Kashmir):** A 73.50 km doubling project to increase capacity, reduce delays, and improve connectivity. It has been designated as a Hill Strategic Corridor to facilitate the seamless movement of military personnel and equipment. The project includes 10 stations (9 crossing stations and 1 halt).
* **Proposed 3rd & 4th line between Ambala - Jalandhar:** The project will develop a 3rd line between Ludhiana-Jalandhar Cantt and a 4th line between Ambala Cantt-Sahnewal, covering 138 km. It includes 44 Road Under Bridges (RUBs) and 1 Road Over Bridge (ROB) and will augment capacity on the Ambala-Ludhiana-Jalandhar-Amritsar corridor.
The road/highway project involves:
* **Construction of 4-Lane Divided Carriageway from Khagaria to Purnia (Bihar):** The project upgrades the existing two-lane road to a four-lane divided carriageway on part of NH31 (Km 270.0-384.2) and NH231 (Km 384.2-410.0). It includes 5 Major Bridges, 6 Minor Bridges , 4 Railway Crossings/ROBs, 2 Toll Plazas, and 4 Truck Lay Bays, aiming to improve connectivity to remote districts and economic hubs.
The evaluations focused on integrated multimodal infrastructure, last-mile connectivity, and a whole-of-government approach, in accordance with PM GatiShakti principles. These projects are expected to improve logistics, reduce travel times, and generate socioeconomic benefits within their respective catchment areas. The meeting was chaired by Shri Pankaj Kumar, Joint Secretary, Logistics, Department for Promotion of Industry and Internal Trade (DPIIT). Release ID: 2163426
Key Entities Referenced
PM GatiShakti National Master Plan: A national plan for integrated infrastructure development, aiming to improve multimodal connectivity and logistics efficiency.
Ministry of Railways: The Indian government ministry responsible for the railway infrastructure and services in India.
Ministry of Road, Transport Highways: The Indian government ministry responsible for the development and maintenance of road and highway infrastructure in India.
Baramulla to Uri: A railway line project in Jammu and Kashmir connecting the towns of Baramulla and Uri.
Jammu Kashmir: A union territory of India, formerly a state, located in the northern part of the country.
Qazigund to Badgam: A railway line doubling project in Jammu and Kashmir, aiming to enhance capacity and connectivity.
Ambala Jalandhar: A railway line expansion project involving the addition of 3rd and 4th lines between Ambala CanttSahnewal and LudhianaJalandhar Cantt, passing through Haryana and Punjab.
Khagaria to Purnia: A road construction project in Bihar, involving the upgrade of the existing two-lane road to a four-lane divided carriageway.
Ministry of Commerce & Industry
99th Meeting of Network Planning Group under PM
GatiShakti evaluates key Infrastructure projects
04 projects including 03 Rail and 01 Road/Highway
evaluated for alignment with integrated multimodal
infrastructure and socio-economic benefits
Posted On: 03 SEP 2025 6:34PM by PIB Delhi
The 99th meeting of the Network Planning Group (NPG), convened today to evaluate infrastructure projects
of Road, Transport & Highways. The meeting focused on enhancing multimodal connectivity and logistics
efficiency in alignment with the PM GatiShakti National Master Plan (PMGS NMP).
The NPG evaluated 04 projects comprising 01 Road/Highway project of the Ministry of Road, Transport &
Highways (MoRTH) and 03 Rail projects of the Ministry of Railways (MoR), including 02 Brownfield, 01
Greenfield, and 01 Greenfield + Brownfield projects. The evaluation was undertaken to ensure conformity to
PM GatiShakti principles of integrated multimodal infrastructure, last-mile connectivity to economic and
social nodes, and a ‘whole of Government’ approach. These initiatives are expected to boost logistics
efficiency, reduce travel times, and deliver significant socio-economic benefits to the catchment areas of the
projects. The meeting was chaired by Shri Pankaj Kumar, Joint Secretary, Logistics, Department for
Promotion of Industry and Internal Trade (DPIIT). The evaluation and anticipated impacts of these projects
are detailed below:
Ministry of Railways(MoR)
New Broad Gauge (BG) line from Baramulla to Uri: The Ministry of Railways has proposed the construction
of a new 40.2 km railway line between Baramulla and Uri in Jammu & Kashmir, connecting five existing
stations. The project will provide all-weather, reliable rail connectivity, addressing frequent disruptions faced
by road travel during harsh weather. Uri, located near the Line of Control at Kaman Post, has already emerged
as a border tourism destination. With the new railway line, tourism in the region is expected to receive a
significant boost. The project also holds strategic importance, as Baramulla and Uri Tehsil house major Indian
Army establishments and lie close to the border. The proposed railway line will include 3 Road Under
Bridges (RUBs) and 9 Road Over Bridges (ROBs) and will be developed as a new single Broad-Gauge line,
requiring fresh land acquisition.
Doubling of Qazigund to Badgam: The Ministry of Railways has proposed the doubling of the
Qazigund–Badgam railway line, covering a 73.50 km stretch in Jammu & Kashmir. At present, the
Qazigund–Baramulla line operates as a single track. With the commissioning of the Katra–Banihal section in
2025, the corridor will be fully integrated with the Indian Railways network, offering huge potential for
passenger and freight traffic. The doubling project is of strategic importance, enabling seamless movement of
military special trains carrying Army personnel, equipment, and supplies. Accordingly, it has been designated
under the Hill & Strategic Corridor. Key highlights: (a) 10 stations (9 crossing stations and 1 halt), all existing
in J&K, will be covered. (b) The new alignment will run parallel to the existing line. (c) Doubling will
increase capacity, reduce delays, and strengthen connectivity across the Valley. The project will also boosttourism and local economic activity, while ensuring faster, safer, and reliable logistics for defence needs. The
proposal marks another step towards building a resilient and strategically vital railway network in Jammu &
Kashmir.
Proposed 3rd & 4th line between Ambala – Jalandhar : The Ministry of Railways has proposed the
development of a 3rd line between Ludhiana–Jalandhar Cantt and a 4th line between Ambala
Cantt–Sahnewal, covering 138 km on Broad Gauge (1676 mm). The alignment passes through key districts of
Punjab (Patiala, Fatehgarh Sahib, Ludhiana, Kapurthala, Jalandhar) and Ambala district in Haryana. The
project will reduce travel time, ease congestion, and increase capacity for both passenger and freight trains. It
will cover 21 stations including Ambala Cantt, Patiala, Ludhiana, Kapurthala, and Jalandhar, and include 44
Road Under Bridges (RUBs) and 1 Road Over Bridge (ROB) for safe and smooth operations. This section
forms part of the Ambala–Ludhiana–Jalandhar–Amritsar corridor, which currently handles nearly 92 trains
per direction per day. The additional lines will provide crucial capacity augmentation, benefitting agriculture,
trade, tourism, and industry in the region. Strategically, the project holds exceptional importance for national
security, as the corridor serves as the shortest and most vital rail link to Jammu & Kashmir, enabling faster
movement of defence personnel, logistics, and supplies to border areas.
Ministry of Road, Transport & Highways (MoRTH)
Construction of 4-Lane Divided Carriageway from Khagaria to Purnia :The Ministry of Road, Transport and
Highways has proposed the upgradation of the existing two-lane to a four-lane divided carriageway between
Khagaria to Purnia in Bihar. The road will cover part of NH-31 (Km 270.0–384.200) and NH-231 (Km
384.200–410.0). NH-31 is one of India’s key highways, starting near Unnao in Uttar Pradesh and passing
through major towns such as Varanasi, Ghazipur, Chhapra, Patna, Begusarai, Khagaria, Bhagalpur, and
Katihar before ending in Pandua, West Bengal. This stretch will connect remote districts like Khagaria and
Katihar in the Seemanchal region with Patna and other important urban centers, ensuring people in
underdeveloped areas have better access to jobs, markets, healthcare, and services. It will help drive inclusive
growth by linking marginalized communities with the state’s economic hubs. Project Highlights: 5 Major
Bridges, 6 Minor Bridges , 4 Railway Crossings/ROBs, 2 Toll Plazas, 4 Truck Lay Bays. Connectivity
Benefits: (a) Direct link to the Patna–Purnia Expressway (via NH-27).(b) Easy access to Khagaria, Bhagalpur,
Katihar, and Purnia railway stations. (c) Better link to Purnia Airport (via NH-231 and NH-27). Once
completed, the highway will provide faster, safer travel, reduce travel time, and improve the movement of
goods and passengers. It is expected to become a key driver for regional trade, agriculture, tourism, and
overall development in the Seemanchal region.
*****
Abhishek Dayal/Abhijith Narayanan/Shabbir Azad
(Release ID: 2163426)