Executive Summary & Key Takeaways
**Executive Summary**
The document is a Tamil Nadu Government Gazette notification. It republishes an order from the Government of India regarding the removal of licensing requirements, stock limits, and movement restrictions on specified foodstuffs, extending the deadline from December 31, 2017, to March 31, 2018. It also includes rules for regulating the Kariyakoil Reservoir Project in Salem District for irrigation purposes, effective February 7, 2018.
**Key Points / Main Content**
* **Foodstuffs Order Amendment (2017)**
* Extends the deadline for the Removal of Licensing Requirements, Stock Limits and Movement Restrictions on Specified Foodstuffs Order, 2016.
* The deadline is extended from "31st December, 2017" to "31st March, 2018."
* **Kariyakoil Reservoir Project Regulations:**
* The project involves a 190 Mcft reservoir across the Kariyakoil River and canals to irrigate dry lands, stabilize existing wet lands, and service anicuts.
* The catchment area at the dam site is 27.03 sq. miles, with a yield of 336.79 Mcft.
* The regulation of the reservoir will be the responsibility of the Assistant/Junior Engineer under the Executive Engineer's direction.
* **Water Distribution Priorities:**
* Priority is given to the natural flow of the Kariyakoil River for the direct old ayacut of 1776.08 acres.
* 2/3rd capacity of five existing tanks under specified anicuts is to be filled before impounding water in the reservoir.
* **New Irrigation Schedule:**
* New ayacut supplies (left and right canals) are allowed from October 1 to December 31 for the first crop and January 1 to April 30 for the second crop.
* First crop ayacut is 3000 acres, and the second crop is 3600 acres.
* **Storage Requirements:**
* A minimum storage of 125 Mcft is needed by October 1 for the first crop of 3000 acres.
* A minimum storage of 180 Mcft is required by January 1 for the second crop of 3600 acres.
* **General Rules for the Reservoir Project:**
* The controlling officer can deplete storage for dam safety with intimation to Water Resources Department Staff.
* The Executive Engineer, Sarabanga Basin Division, in consultation with the District Collector of Salem District, fixes the extent of supplies if the storage is inadequate, publicizing it before September 15.
**Impact Analysis**
**Central Government**
* **Impact:** Must be aware of the extended deadline for the order regarding foodstuffs.
* **Action Required:** Update relevant processes and documentation to reflect the new deadline of March 31, 2018.
**Tamil Nadu State Government**
* **Impact:** The rules and regulations govern the Kariyakoil Reservoir Project and impact irrigation in the area.
* **Action Required:** The controlling officer must adhere to the established rules. Stakeholders should take note of the priorities and schedule for water release.
**Farmers (Ayacutdhars)**
* **Impact:** Old ayacutdhars are prioritized in water distribution. New ayacutdhars will receive water per the set schedules and amounts.
* **Action Required:** Be aware of water distribution priorities, schedules, and any notifications regarding supply limitations. Adhere to the turn system if implemented.
**Water Resources Department Staff**
* **Impact:** They are responsible for managing and implementing the rules for the Kariyakoil Reservoir Project.
* **Action Required:** The responsible authorities must regulate the water supply, monitor storage levels, and disseminate information to all stakeholders, including the District Collector, Revenue Divisional Officer, and other key personnel. Maintain detailed records and provide reports to the necessary authorities.
Key Entities Referenced
Tamil Nadu Government Gazette : Official publication used for notifications, orders, and other announcements
Essential Commodities Act, 1955 : Central law authorizing the Central Government to control the production, supply and distribution of essential commodities to maintain or increase supplies and to secure their equitable distribution and availability at fair prices.
Removal of Licensing Requirements Stock Limits and Movement Restrictions on Specified Foodstuffs Order : Order related to regulations on licensing, stock limits, and movement of specific food items
Kariyakoil Reservoir Project : Project involving the construction and operation of a reservoir in Pappanaickenpatti Village, Attur Taluk, Salem District for irrigation purposes.
Salem District : The district where the Kariyakoil Reservoir Project is located, and whose District Collector is involved in decisions related to water supply
See Full Document Text
© [Regd. No. TN/CCN/467/2012-14.
GOVERNMENT OF TAMIL NADU [R. Dis. No. 197/2009.
2018 [Price: Rs. 2.40 Paise.
TAMIL NADU
GOVERNMENT GAZETTE
PUBLISHED BY AUTHORITY
No. 6] CHENNAI, WEDNESDAY, FEBRUARY 7, 2018
Thai 25, Hevilambi, Thiruvalluvar Aandu–2049
Part II—Section 1
Notifi cations or Orders of specifi c character or of particular interest to the public
issued by Secretariat Departments.
NOTIFICATIONS BY GOVERNMENT
CONTENTS
Pages.
CO-OPERATION, FOOD AND CONSUMER PROTECTION DEPARTMENT
Removal of Licensing Requirements Stock Limits and Movement Restrictions on specifi ed
Foodstuffs (Seventh Amendment) Order, 2017. .... .... .... .... 1122
ªªð𣣶¶ŠŠððEEˆˆ ¶¶¬¬øø
Rules of Kariyakoil Reservoir Project at Pappanaickenpatti Village in Attur Taluk of
Salem District.... .... .... .... .... .... .... 1122--1155
[ 11]
DTP—II-1 (6)—112 TAMIL NADU GOVERNMENT GAZETTE [Part II—Sec. 1
NOTIFICATIONS BY GOVERNMENT
CO-OPERATION, FOOD AND CONSUMER PROTECTION DEPARTMENT
Removal of Licensing Requirements Stock Limits and Movement Restrictions on specifi ed
Foodstuffs (Seventh Amendment) Order, 2017.
[G.O. Ms. No. 7, Co-operation, Food and Consumer Protection (H1), 22nd January 2018,
¬î 9, «ýM÷‹H, F¼õœÀõ˜ ݇´-2049.]
No. II(1)/CFCP/5/2018.—The following order of the Government of India Ministry of Consumer Affairs, Food and Public
Distribution (Department of Consumer Affairs) New Delhi, the 27th December, 2017 is republished:—
S.O. 4079(E) - In exercise of the powers conferred by Section 3 of the Essential Commodities Act, 1955 (10 of 1955),
the Central Government hereby makes the following order further to amend the Removal of Licensing Requirements, Stock
Limits and Movement Restrictions on Specifi ed Foodstuffs Order, 2016, namely :-
1. Short title and commencement- This order may be called the Removal of Licensing Requirements, Stock Limits and
Movement Restrictions on Specifi ed Foodstuffs (Seventh Amendment) Order, 2017.
2. In the Removal of Licensing Requirements, Stock Limits and Movement Restrictions on Specifi ed Foodstuffs Order,
2016, in clause 3, in sub-clause (2), in item (iv), for the fi gures, letters and word "31st December, 2017", the fi gures, letters
and words "31st March, 2018" shall be substituted.
[[FF..NNoo.. SS--1100//33//22001177 --EECCRR && EE]]
AA..KK.. CCHHOOUUDDHHAARRYY,,
EEccoonnoommiicc AAddvviisseerr..
Note: The principal order was published in the Gazette of India, Extraordinary, Part II—Section 3, sub-section (i), vide
number G.S.R. 929 (E), dated the 29th September, 2016 and was subsequently amended vide numbers S.O.3341 (E), dated
the 27th October, 2016, S.O. 1288(E), dated the 25th April, 2017, S.O .1600 (E), dated the 17th May, 2017, S.O. 2785 (E),
dated the 25th August, 2017, S.O.3136 (E), dated the 27th September, 2017, S.O.3397 (E), dated the 23rd October, 2017
and S.O.3422 (E), dated the 25th October, 2017.
((RReeppuubblliisshheedd bbyy oorrddeerr ooff tthhee GGoovveerrnnoorr))
KKUUMMAARR JJAAYYAANNTT,,
Principal Secretary to Government.
ªªð𣣶¶ŠŠ ððEEˆˆ ¶¶¬¬øø
Rules of Kariyakoil Reservoir Project at Pappanaickenpatti Village in Attur Taluk of Salem District
ÜÜóóê꣣¬¬íí ((GG¬¬ôô)) â⇇.. 1177,, ªªð𣣶¶ŠŠððEE ((ââ¡¡.. 11))ˆˆ ¶¶¬¬øø,, 1188 üüùùõõKK 22001188,, ¬¬îî 55,,
««ýýMM÷÷‹‹HH,, FF¼¼õõœœÀÀõõ˜˜ Ý݇‡´´--22004499..]]
No. II(1)/PW/6/2018.—
Basin : Vellar Basin
Sub Basin : Vasishtanadhi
Introduction:
The Project comprises a reservoir of 190 Mcft capacity across the Kariyakoil River in Pappanaickanpatty Village of
Attur Taluk in Salem District and a right side main canal of about 10.84 km long to irrigate about 1775 acres of dry lands
and a left side main canal of about 10.325 km long to irrigate about 1825 acres of dry lands. These canals take off from
the Kariyakoil reservoir at the head reaches and carry a discharge of 20 cusecs each. In addition, about 2631.79 acres of
existing wet lands under 8 anicuts of old ayacut are stabilized. The entire new ayacut lies in the Villages of Malayalapatti,
Thumbal and Edaiyapatty in Attur Taluk.
DTP—II-1 (2)—1aFeb. 7, 2018] TAMIL NADU GOVERNMENT GAZETTE 13
2. The Catchment area at the Dam site is 27.03 sq.miles under hilly area and the yield as worked out at this site is
336.79 Mcft.
3. The River Kariyakoil originates from the slopes of the Kalrayan Hills in Attur Taluk and it confl uences with Ammapalayam
River near Thumbal and then it is called Thumbal River which is a tributary of the River Vasishtanadhi. The Thumbal River
joins the main River Vasishtanadhi at Kottavadi Anicut. It receives large discharges during the Monsoon period.
4. There is no irrigation above the dam site. However, there are 8 anicuts within a distance of 25 km downstream of
the dam site, irrigating about 1776.08 acres of direct and 855.71 acres of indirect ayacut.
5. The Full Reservoir Level of the Reservoir is 454.00 m and the Top Bund Length is at 456.00 m. The maximum
Flood Discharge of 27,200 cusecs is allowed through the masonry spillway having 3 vents of 9.00 m x 6.10m with crest
level of 447.90 m.
6. The right side main canal at L.S. 218.00 m and the left side main canal at L.S. 592.00m are at the sill level of 438.00m
and the size of the vent way of the sluice is 0.90m x 1.50m for both the canals. The length of right side main canal is
10.84 km with a carrying capacity of 20.19 cusecs and it feeds an ayacut of 1775 acres of dry lands. The length of left
side main canal is 10.325 km with a carrying capacity of 21.72 cusecs and it feeds an ayacut of 1825 acres of dry lands.
7. The supply for 2631.79 acres under the following 8 anicuts and 5 tanks will be let down through both the canal sluices
and diverted into main River with the screw gearing arrangements:-
Sl. Name of the anicut / Village Direct Feeding tank by anicut Tank / Total ayacut in
No. ayacut indirect acres
in acres ayacut
in acres
1. Kumarapalayam Anicut 89.40 - - 89.40
2. Kottavadi Anicut 202.56 - - 202.56
3. Kalyanagiri Anicut
(a) Kalyanagiri Village 167.43 Kalyanagiri Tank Nil 468.75
(b) Kalleripatti Village 115.17 Kalleripatti Tank 186.15
4. Abinavam Anicut 339.93 Abinavam Tank 28.20 368.13
5. Puthiragoundampalayam
Anicut
(a) Puthiragoundampalayam 155.37 Puthiragoundampalayam Tank 208.91 601.15
Village
(b) Ethapur Village 236.87
6. Chinnammasamudram Anicut 233.58 Chinnammasamudram Tank 147.29 380.87
7. Erramasamudram Anicut - Erramasamudram Tank (Panai Eri) 285.16 285.16
8. Pethanaickenpalayam Anicut 235.77 - - 235.77
Total 1776.08 855.71 2631.79
RULES FOR REGULATION
1. Control:
Regulation of supply from the reservoir shall be the responsibility of the Assistant Engineer or Junior Engineer in-charge of
the Reservoir (who will hereafter be called as controlling offi cer) under the overall direction of the Assistant Executive Engineer.
2. Old Irrigation:
Water is not fl owing throughout the year in Kariyakoil River. Normally, water fl ow occurs from the month of July due
to South West Monsoon and heavy fl ow realized during October to December due to North East Monsoon. The major
cultivation is based on the above fl ow. The old ayacut of 2631.79 acres under the 8 Nos. of anicuts will be stabilized during
1st September to 31st December.
To safeguard the riparian irrigation rights of the traditional ayacutdhars in the lower reaches who were dependent on fl ow
in the river even before the project was conceived (i.e old ayacut) initially water for irrigation shall normally be let out in the
river on priority basis so as to cater to the needs of the anicuts and tanks under old ayacut in the manner prescribed below:-14 TAMIL NADU GOVERNMENT GAZETTE [Part II—Sec. 1
(a) In order to provide irrigation to the direct old ayacut of 1776.08 acres, the natural fl ow of the Kariakoil River
shall be allowed directly without impounding in the Reservoir. Adopting a duty of 50 acres per cusecs with an average
seepage loss of 20% over a distance of about 25 km the total requirement of water for 1776.08 acres comes to 45 cusecs.
This quantum of water will be released from the reservoir through the right main canal and left main canal, whenever the
water level is below the crest level and through spill way whenever the water level is above crest level. During this period,
necessary turn system shall be adopted to assure equitable supply to this old direct ayacut.
(b) To safeguard the riparian rights of the old ayacutdhars of the indirect ayacut of 855.71 acres, 2/3rd capacity of
the existing fi ve tanks i.e (1) Kalleripatti tank, (2) Abinavam Tank, (3) Puthiragoundampalayam Tank, (4) Chinnammasamudram
Tank, (5) Errammasamudram Tank (Panai Eri) under the above anicuts is allowed to be fi lled through the River before
impounding the water in Kariyakoil Reservoir.
(c) Whenever the controlling offi cer anticipates good rain fall in the existing area and the lower down ayacutdhars
do not require any supply, the release from the reservoir can be reduced or cut off by him.
3. New Irrigation
(a) The Supply for the new ayacut under the left and right side main canals will normally be allowed from
1st October to 31st December for 1st crop and 1st January to 30th April for 2nd crop. The ayacut under 1st crop will be
3000 acres and that of under 2nd crop will be 3600 acres as under:
Village 1st crop (in acres) 2nd Crop (in acres)
Malayalapatti 971.61 971.61
Thumbal 643.10 757.32
Edayapatti 1385.29 1871.07
Total 3000.00 3600.00
(b) A minimum storage of 125 Mcft is necessary on 1st October for allowing supply for the 1st crop of 3000 acres
and a minimum storage of 180 Mcft is necessary on 1st January for allowing supply for the 2nd crop of 3600 acres.
(c) If the storage is inadequate, in any year for allowing the supply for the entire ayacut under the canal system, the
Executive Engineer, Sarabanga Basin Division in consultation with the District Collector of Salem District shall fi x the extent
that can be supplied with and the probable date from which supply could be made and to give wide publicity to it, not later
than 15th September.
(d) The supply for the new irrigation under the canals shall be regulated as 10 cusecs for every 1000 acres of new
ayacut for raising dry crops.
(e) The duty proposed as above may serve a general guidance. The controlling offi cer can alter the duty considering
the rainfall in the irrigated area for both new and old ayacuts, with the prior approval of the Executive Engineer, Sarabanga
Basin Division.
(f) If the water level is below the crest level, turn system will be adopted for both new and old ayacut.
4. GENERAL:
Notwithstanding these rules, if in the opinion of the controlling offi cer, depletion of part or entire storage in the reservoir
is considered necessary in the interest of the safety of the dam, he may do so after full consideration of all relevant factor
and after giving prior intimation to all Water Resources Department staff concerned for taking such precautionary measures
as are necessary and also to facilitate maximum utilization of the released storage for the benefi t of the lower down irrigation.
(ii) Prior intimation should be given to the District Collector of Salem District, Revenue Divisional Offi cer, Attur, Tahsildar,
Attur, Chief Engineer, Water Resources Department, Trichy Region, Superintending Engineer, Water Resources Department,
Upper Cauvery Basin Circle, Executive Engineer, Water Resources Department, Sarabanga Basin Division, Deputy Superintendent
of Police, Attur and the Rural Inspector of Police, Yethapur before such emergency releases are made.
(iii) If in any year there is adverse seasonal conditions and it may not be possible to allow supplies for the entire ayacut,
the area to be supplied water will be notifi ed by the District Collector of Salem District in consultation with the Executive
Engineer, Sarabanga Basin Division. The part of the ayacut which has not been given supplies will get top priority on
supplies in the next irrigation season. This rotational order will be decided and notifi ed in advance for the convenience of
ayacutdhars.
(iv) Whenever any deviation from these rules is considered necessary, in the interest of irrigation, prior approval of the
Chief Engineer, Water Resources Department, Trichy Region, should be obtained, after explaining fully the necessity thereof.
Before sending report on this, the District Collector of Salem District should also be consulted and his concurrence obtained.Feb. 7, 2018] TAMIL NADU GOVERNMENT GAZETTE 15
(v) Whenever there is demand for supply for the ayacut of the project beyond the notifi ed closure date, the ayacut
area shall be inspected by the Assistant Executive Engineer, Revenue Divisional Offi cer and District Agricultural Offi cer
concerned. If supply is available and can be extended beyond notifi ed period without affecting the other legitimate interests,
the Executive Engineer, Sarabanga Basin Division with the concurrence of the District Collector of Salem District may allow
extension of supplies for fi fteen days under intimation to the Chief Engineer, Water Resources Department, Trichy Region
and the Superintending Engineer, Water Resources Department, Upper Cauvery Basin Circle. There shall be no extension
thereafter.
(vi) The regulation shall normally be done once a day at 8.00 A.M and shall be based on full appreciation of all relevant
factors. However, during fl oods, regulation has to be done at frequent intervals to ensure minimum depletion consistent with
the safety of the dam.
(vii) All regulation details, water levels, issues etc., shall be entered daily in the Register maintained for the purpose
by the Assistant Engineer or Junior Engineer in-charge of the dam as per the prescribed proforma. The extract from the
register shall be sent daily to the Assistant Executive Engineer in-charge of Kariyakoil Reservoir, Executive Engineer, Water
Resources Department, Sarabanga Basin Division, Executive Engineer, Gauging Division, Tharamani, Chennai, Superintending
Engineer, Water Resources Department, Upper Cauvery Basin Circle and the Chief Engineer, Water Resources Department,
Trichy Region.
SS..KK.. PPRRAABBAAKKAARR,,
Principal Secretary to Government.