**Executive Summary**
This report highlights the completion of the Ahmedabad-Dholera Greenfield Expressway (NE-8). The 109.019 km expressway, built under the Bharatmala Pariyojana at a cost of ₹5,800 crore, connects villages to cities and provides seamless connectivity to the Dholera Special Investment Region (DSIR). The expressway is currently open for public testing.
**Key Points / Main Content**
* **Project Overview:**
* The Ahmedabad–Dholera Greenfield Expressway (NE-8) spans 109.019 km.
* The expressway connects villages to cities and families to time.
* It facilitates seamless connectivity to the Dholera Special Investment Region (DSIR).
* The total project cost is ₹5,800 crore.
* The expressway is currently open to the public for testing purposes to assess final operational readiness.
* **Environmental Impact & Construction:**
* Environment-first construction approach.
* 60 lakh metric tonnes of Ahmedabad Municipal Corporation waste was reused in embankment construction.
* 22 lakh metric tonnes of fly ash were utilized, reducing industrial waste and carbon impact.
* Massive green initiative with over 2,70,675 plants in the median and 1,56,097 avenue plantations.
* **Key Features:**
* 30-metre wide median designed for future expansion to 8 lanes.
* Direct connectivity to Dholera International Airport via interchange at Ch. 67.
* Planned Semi High-Speed Rail corridor running parallel (30 m ROW already acquired).
* Closed tolling system for seamless travel.
* 2 modern Way-Side Amenities.
* Extensive structures including: 3 ROBs, 11 interchanges, 14 flyovers, 86 underpasses, 224 culverts, and more.
* **Travel Time Reduction:**
* Ahmedabad to Dholera: reduced from 100 km & 2 hr 15 min to 83 km & 45 min.
* Ahmedabad to Bhavnagar: reduced from 169 km & 3 hr 15 min to 141 km & 1 hr 45 min.
**Impact Analysis**
**Commuters**
*Impact*
*Commuters using the expressway for testing purposes now experience faster and smoother travel.
*Increased time with families.
*Action Required*
*None explicitly mentioned; commuters are currently testing the expressway.
**Investors**
*Impact*
*Improved connectivity and reduced travel time to Dholera is expected to make investors happy and increasingly eager to invest.
*Action Required*
*No immediate action; this section is informative to improve investment.
**Residents of Pipli Village**
*Impact*
*The expressway has transformed how families in Pipli village relate to the city, making Ahmedabad more accessible.
*Action Required*
*None.
Key Entities Referenced
Ahmedabad–Dholera Greenfield Expressway (NE-8): An expressway connecting Ahmedabad and Dholera, intended to improve connectivity and boost economic potential.
Ministry of Road Transport & Highways: The ministry responsible for the development and maintenance of road transport infrastructure in India.
Bharatmala Pariyojana: A centrally-sponsored and funded road and highways project in India.
Ahmedabad: A city in Gujarat connected to Dholera via the expressway.
Dholera Special Investment Region (DSIR): A planned smart city in Gujarat connected by the expressway.
Ministry of Road Transport & Highways
Ahmedabad–Dholera Expressway Is Bringing
Cities, Families & Dreams Closer
Posted On: 27 FEB 2026 3:53PM by PIB Delhi
The Ahmedabad–Dholera Greenfield Expressway (NE-8), stretching 109.019 km, is no longer just a road
under the Bharatmala Pariyojana. It has become a lifeline, which is connecting villages to cities, families
to time, and aspirations to opportunities.
Passing through Ahmedabad and Bhavnagar districts, the expressway provides seamless connectivity to
the Dholera Special Investment Region (DSIR) and the existing coastal highway, redefining how people
live, travel, and dream in this region. Built at a total project cost of ₹5,800 crore, the expressway
represents one of the most significant infrastructure investments in the region.At present, the expressway has been opened to the public for testing purposes, allowing commuters to
experience faster and smoother travel while final operational readiness is assessed.
For frequent travellers like Narendra Singh Chudasma, who regularly journeys between Gandhinagar and
Bhavnagar, the expressway has brought a priceless change.
“Earlier, the journey used to take 3.5 to 4 hours. Now I reach within 2.30 to 2.45 hours. Because of long
hours on the road earlier, I couldn’t give enough time to my family. Now, the 2 to 2.5 hours I save are
spent with them.”
The expressway is also unlocking Dholera’s economic potential. Yaduraj Singh Chudasma believes
connectivity has removed the biggest hesitation investors once had.
“With the opening of this expressway, investors can travel easily and save time. Reaching Dholera from
Ahmedabad now takes just 45 minutes, which is extremely important. Investors are happy and
increasingly eager to invest in Dholera. This highway has removed the connectivity gap that once
existed.”
For Harshdeep Singh Chudasma, a resident of Pipli village, the expressway has transformed how his
family relates to the city.
“Two years ago, we felt that we lived very far from Ahmedabad as Ahmedabad was almost 120 to 130
kilometres away. But ever since this expressway was built, it feels like we live in Ahmedabad itself.
Today, reaching Ahmedabad takes just 45 minutes, compared to two and a half hours earlier.”Building Infrastructure, Protecting the Environment
A defining aspect of the Ahmedabad–Dholera Expressway is its environment-first construction approach,
proving that large infrastructure can grow responsibly.
• 60 lakh metric tonnes of Ahmedabad Municipal Corporation waste reused in embankment
construction
• 22 lakh metric tonnes of fly ash utilised, reducing industrial waste and carbon impact
• Massive green initiative with over:
o 2,70,675 plants in the median
o 1,56,097 avenue plantations
Key Features of the Expressway
• 30-metre wide median designed for future expansion to 8 lanes
• Direct connectivity to Dholera International Airport via interchange at Ch. 67
• Planned Semi High-Speed Rail corridor running parallel (30 m ROW already acquired)
• Closed tolling system for seamless travel
• 2 modern Way-Side Amenities
• Extensive structures including: 3 ROBs, 11 interchanges, 14 flyovers, 86 underpasses, 224
culverts, and more
Transforming Travel, Economy and Everyday Life
The expressway has drastically reduced travel distances and times:
• Ahmedabad to Dholera: from 100 km & 2 hr 15 min → 83 km & 45 min
• Ahmedabad to Bhavnagar: from 169 km & 3 hr 15 min → 141 km & 1 hr 45 min
It brings families closer, saves time, attracts opportunity, and builds a greener future—one journey at a
time.*****
GDH/HJ
(Release ID: 2233516) Visitor Counter : 2322
Read this release in: Urdu , ही , Gujarati , Telugu