See Full Document Text
(cid:315)(cid:175)ೇಷ (cid:170)ಾಜ(cid:205) ಪ(cid:294)(cid:206)(cid:144)ೆ
¨sÁU À – 3 , 14 , 2026 24 1948) . 375
Part – III BENGALURU, THURSDAY, 14, MAY, 2026 ( VAISHAKHA , 24, SHAKAVARSHA, 1948) No. 375
Greater Bengaluru Authority
BENGALURU CENTRAL CITY CORPORATION
10th floor, Public Utility Building, MG road,
Bengaluru-560 001
***************************************************************************
No: BCCC/Com/PR/48/2026-27 Date: 14/05/2026
NOTIFICATION
Whereas, the draft of the Building (Amendment) Bye-Laws further to amend the
Bengaluru City Corporation Building Bye-Laws, 2003 which the Bengaluru Central City
Corporation proposes to make in exercise of the powers conferred by section 317 read with
sections 224, 232, 233 241 and 318 (2) of the Greater Bengaluru Governance Act, 2024
(Karnataka Act 36 of 2025), was published vide notification no: Com/BCCC/PR/28/2026-27
dated: 01.04.2026 inviting objections and suggestion from all persons likely to be affected
thereby within thirty days from the date of its publication in the Official Gazette.
And whereas, the said Gazette was made available to the public on 1st of April, 2026;
And whereas, objections & suggestions have been received and considered by the
Bengaluru Central City Corporation;
Now, therefore, in exercise of the powers conferred by section 318(2) and read with
section 224, 232, 233 241 and 317 of the Greater Bengaluru Governance Act, 2024
(Karnataka Act 36 of 2025). The Bengaluru Central City Corporation hereby makes the
following Building Bye-Laws, namely.-
BYE-LAWS
1. Title and commencement.- (1) These Bye-laws may be called the Bengaluru City
Corporation Building (Amendment) Bye-laws, 2026.
(1)2
(2) They shall come into force from the date of their final publication in the official
Gazette.
2. Amendment of Bye-law 3.8; Bye-law 3.9 & Bye-Law 3.10:- In the Bengaluru City
Corporation Building Bye-laws- 2003 (hereinafter referred to as the said bye-laws),
Bye-law 3.8- Ground Rent; Bye-law 3.9- Ground Rent for high rise buildings and
Bye-law 3.10- Exemption of ground rent the entire provision shall be omitted.
3. Amendment to Bye-law 6.0 Deviation during construction:-
Clause (i) under Bye-law no 6.0 shall be substituted as below:-
i) Wherever any construction is in violation/deviation of the sanctioned plan, the
Commissioner may, if he considers that the violations / deviations are within the limits
specified in Table-2B below in case of (1) the setback to be provided around the
building, (2) plot coverage (3) floor area ratio and (4) height of the building and that
the demolition under chapter XVII of the Act is not feasible without affecting structural
stability, he may regularize such violations/deviations after recording detailed reasons
for the same.
Table-2A
Rate of fee & Penalty for not obtaining Plinth Certificate while issue of occupancy
certificate
Rate of fee for issue of occupancy
certificate on the guidance value of site,
subject to a minimum consideration of
Sl Rs.50,000/- per sq.m to be Chargeable for
Fee
No the total built up area of all floors.
Non Residential
Residential (Commercial / Industrial /
Other Uses)
1 2 3 4
“Scrutiny Fee” for issue of occupancy
1 0.01% 0.02%
certificate
Compounding Fee for construction
carried out without obtaining plinth
certificate (chargeable for total built up
2 0.06% 0.08%
area constructed without obtaining
plinth certificate)3
Table-2B
Maximum Condonable limits of Deviation against permissible limits
[Subject to provision of minimum Fire Drive way of required width]
Height of
Maximum Deviation allowed in
the
set back
Maximum Maximum building
Sl Deviation Deviation (not
Type of Building
No Total Set allowed in allowed in beyond
Set back on any
back Area Coverage FAR sanctioned
side
on all sides numbers of
floors)
1 2 3 4 5 6 7
Deviation/ violation against the permissible limit
Half of the
required set back
measured
All buildings of upto set
linearly,
height below 15 m in back
1. 15% Provided 15 % 7.5 %
plots of extent upto deviation
Deviation in
500 Sq.m limits
total set back
area shall not
exceed 15 %
All buildings of
height above / 15 %
5%
2 below 15 m in 15% (Measured 15 % 7.5 %
plots of extent linearly)
above 500 Sq.m
15% 15%
(except in (Measured
-
3 Basement the side linearly except 15% -
abutting the side
road) abutting road).
Note:1) Compounding fee shall be levied as per Table-2C, to condone the deviations within
the limits specified in Table-2B.
2) Building sites which are not eligible for availing premium FAR, the deviation in
FAR area may be allowed upto 15% and compounding fee shall be levied as per
Table-2C.
3) Wherever the setback deviation allowed under Table-2B, amounts to FAR area
deviation in excess of the condonable limits specified in Table-2B, such entire
deviated FAR area shall be sanctioned by utilizing TDR/Premium FAR only. In case
Premium FAR is utilized, charges shall be levied as per Premium FAR Regulations
for the entire deviated floor area.
4) The deviation in FAR area allowed as per Table-2B shall be limited to a maximum
of 5% of the permissible FAR for buildings which have utilized additional FAR
(TDR/ PFAR). Deviation of FAR area in such buildings shall be condoned by
levying compounding fee as per Table-2C.4
Table-2C
Compounding Fee for condoning Deviations in FAR area
Rate of Compounding fee for Condoning Deviation of FAR
in all floors or area of setback infringement in all floors,
based on the guidance value of site, subject to a minimum
consideration of Rs.50,000/- per sq.m.
Sl Deviations Deviations beyond the permissible limits
Use of Building
No within of Zonal regulations but not exceeding
permissible 15% of the permissible limits in case
limits of Zonal building in plots upto 500 Sq.m and 5 % in
regulations case of buildings in plots of extent above
500 Sq.m
1 2 3 4
Residential
3% 6 %
1 (a) In site area up to 500 Sq̤̤̤.m.
(b) In site area above 500 Sq.m. 5 % 10 %
Non–Residential
2 (Commercial / Industrial / 6 % 12 %
Other Uses)
Note: Compounding fee shall be levied for the total area of ‘deviation in FAR’ or ‘total
covered area of setback infringement in all floors’, whichever is higher.
Table-2D
Compounding Fee for condoning other type of Deviations
Rate of Compounding Fee based on the
guidance value of site, subject to a
minimum consideration of Rs.50,000/- per
sq.m. Chargeable for the built̲-up area
Sl
Details of Compounding Fee constructed in violation of the Sanction
No
Plan and but within permissible limits
Non Residential
Residential (Commercial / Industrial /
Other Uses)
1 2 3 4
Extension of basement in violation of sanction
1 7 % 14 %
plan
Built-up area in violation of sanctioned
2 9 % 18%
mezzanine floor area
Balcony area in violation of sanctioned plan
3 (subject to maximum of 25 % of total 7 % 14 %
sanctioned Balcony area)R.N.I. No. KARBIL/2001/47147 POSTAL REGN. No. RNP/KA/BGS/2202/2017-19
Licensed to post without prepayment WPP No. 297
5
Construction on Terrace in violation of
4 Sanctioned plan (subject to maximum of 15 % 9 % 18 %
of terrace area)
Built up area constructed other than FAR area
5 5 % 10 %
and also BUA excluding Sl.No.(1) to (4) above
Area / Part of Building Occupied without
6 0.15 % 0.30 %
obtaining Occupancy certificate
Building constructed within the ZR /
Bye-law limits but without obtaining
7 permission from the Competent Authority 0.20% 0.40%
(shall be levied during issue of occupancy
certificate)
Note:
1. Guidance value means the prevailing market value of site notified under Section 45B
of the Karnataka Stamp Act, 1957 (at the time of issue of building permission. viz.,
licence/ plinth certificate/ occupancy certificate).
2. Security Deposit collected during plan sanction / licence shall be refunded or adjusted
towards the compounding fee chargeable during issue of Occupancy certificate.
3. The Occupancy certificate shall be issued only after all the requisite fee, compounding
fee is completely paid to the city corporation.
Commissioner
Bengaluru Central City Corporation
[
ಮುದ(cid:206)ಕರು (cid:178)ಾಗೂ ಪ(cid:206)(cid:144)ಾಶಕರು:- ಸಂಕಲ(cid:163)ಾ(cid:297)(cid:144)ಾ(cid:312)ಗಳ(cid:133), ಕ(cid:163)ಾ(cid:143)ಟಕ (cid:170)ಾಜ(cid:205)ಪತ(cid:206), ಸ(cid:144)ಾ(cid:143)(cid:312) (cid:144)ೇಂದ(cid:206) ಮುದ(cid:206)(cid:158)ಾಲಯ, (cid:166)ೆಂಗಳ(cid:136)ರು