Date: 12-May-2023 Category: Extra Ordinary State: Union Government Country: India

Bid Process Coordinators (BPCs) for the Transmission Schemes

Issued by Ministry of Power · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

Appointment of Bid Process Coordinators (BPCs)

  • The notification appoints Bid Process Coordinators (BPCs) for specific transmission schemes, as recommended by the National Committee on Transmission. This is done under Section 63 of the Electricity Act, 2003.
  • The BPCs are responsible for coordinating the bidding process for the identified transmission schemes.

Key Changes in Transmission Schemes

  • PFC Consulting Ltd. is appointed as the BPC for the 'Provision of Dynamic Reactive Compensation at KPS1 and KPS3' transmission scheme. The scope includes STATCOM installation at KPS1 and KPS3 with specific configurations. The implementation timeframe is 24 months from the date of allocation.
  • REC Power Development and Consultancy Ltd. is appointed as the BPC for the 'Transmission System for Evacuation of Power from RE Projects in Rajgarh 1000 MW SEZ in Madhya Pradesh – Phase- II' transmission scheme. The scope includes augmentation of ICTs at Pachora PS, construction of a 400 kV D/c line between Pachora PS and Ujjain, and associated line bays. The implementation timeframe is 24 months from the date of allocation.
  • PFC Consulting Ltd. is appointed as the BPC for the 'Eastern Region Expansion Scheme-XXXIV (ERES-XXXIV)' transmission scheme. The scope includes the establishment of a 765/400 kV GIS substation at Paradeep, along with associated ICTs, bus reactors, and line bays. The implementation timeframe is 24 months from the date of allocation.
  • The implementation timeframe for STATCOM components in two Rajasthan transmission schemes (Phase-III Part-C1 and Part-F) is extended to 24 months, while the timeframe for other components remains at 18 months. These schemes are related to the evacuation of power from REZs in Rajasthan (20 GW).

Impact Analysis

Transmission Developers/Implementing Agencies

  • The Power Grid Corporation of India Limited (POWERGRID) and OPTCL are required to provide space at existing substations for the implementation of certain line bays and equipment related to the Eastern Region Expansion Scheme (ERES-XXXIV).

Renewable Energy Project Developers

  • RE developers in the Rajgarh SEZ in Madhya Pradesh will be impacted by the Phase-II transmission system development, which aims to facilitate power evacuation from their projects.

Bidding Process Coordinators (BPCs)

  • The BPCs must adhere to the guidelines issued by the Ministry of Power regarding tariff-based competitive bidding.

State Transmission Utilities (STUs)

  • OPTCL is required to provide space at the Paradeep 400/220 kV GIS S/s for the implementation of GIS line bays related to the Paradeep-Paradeep 400 kV D/c line.

Key Entities Referenced

Ministry of Power: The central government ministry responsible for the power sector in India. It issues guidelines and notifications related to transmission schemes and the appointment of BPCs. National Committee on Transmission (NCT): A committee that provides recommendations on transmission schemes. The central government considers these recommendations when appointing BPCs and modifying scheme scopes. PFC Consulting Ltd.: A Bid Process Coordinator (BPC) appointed for the 'Provision of Dynamic Reactive Compensation at KPS1 and KPS3' and 'Eastern Region Expansion Scheme-XXXIV (ERES-XXXIV)' transmission schemes. REC Power Development and Consultancy Ltd.: A Bid Process Coordinator (BPC) appointed for the 'Transmission System for Evacuation of Power from RE Projects in Rajgarh 1000 MW SEZ in Madhya Pradesh – Phase- II' transmission scheme. Electricity Act, 2003: The primary legislation governing the electricity sector in India. Section 63 of the Act provides the framework for tariff-based competitive bidding for transmission projects. POWERGRID: Power Grid Corporation of India Limited, the central transmission utility. It is responsible for providing space at Angul substation for the ERES-XXXIV scheme. OPTCL: Odisha Power Transmission Corporation Limited, the state transmission utility of Odisha. It is responsible for providing space at Paradeep substation for the ERES-XXXIV scheme. MPPTCL: Madhya Pradesh Power Transmission Company Limited, the state transmission utility of Madhya Pradesh.
Official Source Record View Original Source →
See Full Document Text
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99 सी.जी.-डी.एल.-अ.-13052023-245856 xxxGIDHxxx CG-DL-E-13052023-245856 xxxGIDExxx असाधारण EXTRAORDINARY भाग II—खण् ड 3—उप-खण्ड (ii) PART II—Section 3—Sub-section (ii) प्राजधकार स ेप्रकाजित PUBLISHED BY AUTHORITY स.ं 2080] नई दिल्ली, िुििार, मई 12, 2023/ििै ाख 22, 1945 No. 2080] NEW DELHI, FRIDAY, MAY 12, 2023/ VAISAKHA 22, 1945 जिद्यतु मत्रं ालय अजधसचू ना नई दिल्ली, 12 मई, 2023 का.आ. 2172(अ).—केंद्र सरकार, जिद्युत अजधजनयम, 2003 (2003 की संख्या 36) की धारा 63 के अतं गतग पररचाजलत दििा-जनिेिों के परै ा 3 के उप-पैरा 3.2 द्वारा प्रित्त िजियों का प्रयोग करत े हुए, पारेषण संबंधी राष्ट्रीय सजमजत की 12िीं बैठक की जसफाररिों पर, पारेषण स्ट्कीमों के जलए पारेषण स्ट्कीमों के नाम के सामन े ििागए अनुसार, जनम्नजलजखत बोली-प्रदिया समन्ियकों (बीपीसी) की जनयुजि करती ह:ै ि.स.ं पारेषण स्ट्कीमों के नाम एि ंकायक्षग त्रे बोली प्रदिया समन्ियकता ग 1. केपीएस 1 और केपीएस 3 म ेंडायनजे मक ररएजटिि कंपनसिे न का प्रािधान पीएफसी कंसलल्िंग जल. कायक्षग त्रे : 1) केपीएस 1 में 1x125 एमिीएआर एमएससी, 2x125 एमिीएआर एमएसआर के साथ ±300 एमिीएआर स्ट् िेिकॉम, 1 400 केिी बे (िीआईएस) के साथ 400 केिी बस सेटिन-1 । 2) केपीएस 1 में 1 में 1x125 एमिीएआर एमएससी, 2x125 एमिीएआर एमएसआर के साथ ±300 एमिीएआर स्ट् िेिकॉम, 1 400 केिी बे (िीआईएस) के साथ 400 केिी बस सेटिन-2 । 3109 GI/2023 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 3) केपीएस 3 में 1x125 एमिीएआर एमएससी, 2x125 एमिीएआर एमएसआर के साथ ±300 एमिीएआर स्ट् िेिकॉम, 1 400 केिी बे (िीआईएस) के साथ 400 केिी बस सेटिन-1 । रिप्पणी: i) केपीएस 1 तथा केपीएस 3 के िीएसपी स्ट्िेिकॉम के समापन के जलए 1 400 केिी बे (प्रत्येक) के जलए स्ट्थान उपलब् ध कराएंगे। ii) उपयुगट त यथा जनर्िगष् ि स्ट् िेिकॉम की संस्ट्थापना (एमएससी/एमएसआर सजहत) के जलए भूजम की व् यिस्ट् था स्ट्ि ेिकॉम का कायागन् ियन करने िाली िीएसपी द्वारा की िाएगी। iii) कायान्ग ियन समय सीमा: कायान्ग ियन एिेंसी को आिंिन की जतजथ से 24 माह। 2. मध्य प्रििे म ेंरािगढ़ 1000 मगे ािाि एसईिेड म ेंआरई पररयोिनाओं स ेजिद्यतु की जनकासी के आरईसी पािर डेिलपमिें जलए पारेषण प्रणाली - चरण- II एंड कंसल्ि ेंसी जलजमिेड कायक्षग त्रे : िम पारेषण स्ट् कीम का कायक्षग त्रे क्षमता/दकमी स.ं 1. पचोरा पीएस में 400/220 केिी, 3x500 400/220 केिी, 500 एमिीए एमिीए आईसीिी संिधगन (4था, 5िां तथा आईसीिी - 3 6ठां) 400 केिी आईसीिी ब े- 3 220 केिी आईसीिी ब े- 3 400 केिी लाइन ब े- 2 220 केिी लाइन ब े- 4 400 केिी बस सेटिनलाइज़र - 1 सेि 220 केिी बस सेटिनलाइज़र - 1 सेि 220 केिी िीबीसी ब े- 1 220 केिी बीसी ब े- 1 2. पचोरा पीएस – उज्ि नै मागग की लंबाई- 60 दकमी (एमपीपीिीसीएल) 400 केिी डीसी लाइन (ट िाड एसीएसआर/ एएएसी/ एएल59 मूि समतुल् य) 3. पचोरा - उज्जैन 400 केिी डी/सी लाइन 400 केिी लाइन ब े- 2 के जलए उज्जैन (एमपीपीिीसीएल) में 2 400 केिी लाइन ब े रिप्प णी: i) एमपीपीिीसीएल पचोरा पीएस - उज्जैन 400 केिी डी/सी लाइन के समापन हते ु उज्जैन में 2 400 केिी लाइन बे के जलए स्ट्थान उपलब् ध कराएगा। ii) कायान्ग ियन समय सीमा: कायान्ग ियन एिेंसी को आिंिन की जतजथ से 24 माह।[भाग II—खण् ड 3(ii)] भारत का रािपत्र : असाधारण 3 3. पिू ी क्षत्रे जिस्ट्तार स्ट् कीम-X X X IV (ईआरईएस-X X X IV) पीएफसी कंसलल्िंग जल. कायक्षग त्रे : िम स.ं पारेषण स्ट्कीम का कायक्षग त्रे क्षमता 1. पारािीप 765/400 केिी, 2x1500 एमिीए 765/400 केिी, 1500 एमिीए िीआईएस सबस्ट्िेिन की स्ट्थापना आईसीिी: 2 (एक स्ट्पेयर सजहत 7x500 एमिीए लसंगल फेि यूजनि) भािी प्रािधान: जनम्न जलजखत के जलए स्ट्थान: • 765/400 केिी, 4x1500 एमिीए 765 केिी आईसीिी बे: 2 आईसीिी (एक स्ट्पेयर सजहत 13x500 एमिीए लसंगल फेि यूजनि) साथ ही 400 केिी आईसीिी बे: 2 िोनों िोल्िेि स्ट्तरों पर संबद्ध आईसीिी ब े • 400/220 केिी, 5x500 एमिीए 765 केिी, 330 एमिीएआर बस आईसीिी साथ ही िोनों िोल्िेि स्ट्तरों ररएटिर: 2 (बस और लाइन पर संबद्ध आईसीिी बे ररएटिर िोनों के जलए एक स्ट् पेयर • 765 केिी, 2x330 एमिीएआर (एक यूजनि सजहत 7x110 एमिीएआर स्ट्पेयर सजहत 7x110 एमिीएआर लसंगल फेि) लसंगल फेि यूजनि) बस ररएटिर साथ ही संबद्ध बे 420 केिी, 125 एमिीएआर बस • 420 केिी, 2x125 एमिीएआर बस ररएटिर: 2 ररएटिर साथ ही संबद्ध ब े • भािी लाइनों के जलए 10 765 केिी लाइन ब े (जस्ट्िचेबल लाइन ररएटिर के 765 केिी बस ररएटिर बे: 2 जलए स्ट् थान सजहत) • भािी लाइनों के जलए 12 400 केिी 400 केिी बस ररएटिर बे: 2 लाइन ब े (जस्ट्िचेबल लाइन ररएटिर के जलए स्ट् थान सजहत) • भािी लाइनों के जलए 12 220 केिी 765 केिी लाइन बे: 2 लाइन बे [अंगलु (पािरजिड) - पारािीप • 765 केिी बस सेटिनलाइज़र बे: 1 सेि 765 केिी डी/सी लाइन के • 400 केिी बस सेटिनलाइज़र बे: 1 सेि • 220 केिी बस सेटिनलाइज़र बे: 1 सेि समापन, साथ ही िोनों सर्कगिों म ें • 220 केिी बस कपलर ब:े 2 पारािीप छोर पर 765 केिी, • 220 केिी रांसफर बस कपलर ब:े 2 1x330 एमिीएआर जस्ट्िचेबल लाइन ररएटिर, के जलए] 765 केिी, 330 एमिीएआर (3x110 एमिीएआर लसंगल फेि यूजनि) जस्ट्िचेबल लाइन ररएटिर साथ ही संबद्ध बे और 500-ओम एनिीआर (एनिीआर बाईपास व्यिस्ट्था सजहत): 2 [अंगुल (पािरजिड) - पारािीप4 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 765 केिी डी/सी लाइन के िोनों सर्कगिों के पारािीप छोर पर] 400 केिी लाइन बे: 2 [पारािीप-पारािीप (ओपीिीसीएल) 400 केिी डी/सी (क्वाड) लाइन के समापन के जलए] 2. अंगुल (पािरजिड) - पारािीप 765 केिी माग गकी लंबाई: 190 दकमी डी/सी लाइन, साथ ही पारािीप छोर पर िोनों सर्कगिों में 500 ओम एनिीआर (एनिीआर बायपास व्यिस्ट्था सजहत) के साथ 765 केिी, 1x330 एमिीएआर जस्ट्िचेबल लाइन ररएटिर 3. पारािीप - पारािीप (ओपीिीसीएल) माग गकी लंबाई: 10 दकमी 400 केिी डी/सी (क्वाड) लाइन 4. अंगुल (पािरजिड) एस/एस का जिस्ट्तार 765 केिी लाइन बे (भािी जस्ट्िचेबल लाइन ररएटिर के जलए स्ट् थान सजहत): 2 [अंगुल (पािरजिड) - पारािीप 765 केिी डी/सी लाइन के समापन, साथ ही िोनों सर्कगिों म ें पारािीप छोर पर 765 केिी, 1x330 एमिीएआर जस्ट्िचेबल लाइन ररएटिर, के जलए] 5. *पारािीप (ओपीिीसीएल) िीआईएस 400 केिी िीआईएस लाइन बे: 2 एस/एस का जिस्ट्तार [पारािीप-पारािीप (ओपीिीसीएल) 400 केिी डी/सी (क्वाड) लाइन के समापन के जलए] *िैसा दक पारािीप (ओपीिीसीएल) िीआईएस एस/एस की बस स्ट् कीम डेढ़ ब्रेकर स्ट् कीम ह,ै पारािीप (ओपीिीसीएल) - पारािीप 400 केिी डी/सी (क्वाड) लाइन के 2 जभन् न व् यास में समापन के जलए 2 िीआईएस ब ेकी आिश्यकता हतेु स्ट्क ीम में 2 पूणग व् यास अथागत् 4 िीआईएस ब ेका कायागन् ियन आिश् यक ह ै– इस व्यास की अन्य 2 िीआईएस ब ेके उपयोग को भजिष्य म ें जचजननत दकया िाएगा। रिप्पणी: i) कायान्ग ियन समय-सीमा: कायागन्ियन एिेंसी को आिंिन की जतजथ से 24 माह। ii) पािरजिड अंगुल (पािरजिड)-पारािीप 765 केिी डी/सी लाइन के समापन के जलए, 2 765 केिी लाइन बे के कायागन् ियन (भािी जस्ट्िचेएबल लाइन ररएटिर के जलए स्ट् थान सजहत) के जलए, अंगुल (पािरजिड) 765/400 केिी एस/एस पर स्ट् थान उपलब् ध कराएगा। iii) ओपीिीसीएल पारािीप-पारािीप400 (ओपीिीसीएल) केिी डी/सी (क्वाड) लाइन के समापन के जलए केिी िीआईएस लाइन बे के कायागन् ियन के जलए 400 2 (ओपीिीसीएल) कायागन् ियनाधीन पारािीप400/220 केिी िीआईएस एस एस/ (दिसंबर 2024 तक अपेजक्षत) म ें स्ट् थान उपलब् ध कराएगा। 4 पूणग व् यास अथागत् 2 िीआईएस बे स्ट् थाजपत की िाएंगी।[भाग II—खण् ड 3(ii)] भारत का रािपत्र : असाधारण 5 2. बोली-प्रदिया समन्ियक की जनयुजि इस संबंध म ें जिद्युत मत्रं ालय द्वारा िारी, समय-समय पर यथा संिोजधत, दििा-जनिेिों म ेंजनधागररत ितों के अधीन ह।ै [फा. सं. 15/3/2018-रांस-पािग (1)] डॉ. साई बाबा िरभमल्ु ल, संयटु त सजचि (रांस) MINISTRY OF POWER NOTIFICATION New Delhi, the 12th May, 2023 S.O. 2172(E).—In exercise of the powers conferred by sub-para 3.2 of Para 3 of the Guidelines circulated under Section 63 of the Electricity Act, 2003 (no. 36 of 2003), the Central Government, on recommendations of 12th meeting of National Committee on Transmission, hereby appoints the following Bid-Process Coordinators (BPCs) for the Transmission Schemes, as shown against the name of the Transmission Schemes: - Sl. Name & Scope of the Transmission Scheme Bid Process No. Coordinator 1. Provision of Dynamic Reactive Compensation at KPS1 and KPS3 PFC Consulting Ltd. Scope: 1) ± 300 MVAr STATCOM with 1x125 MVAr MSC, 2x125 MVAr MSR at KPS1, 400 kV Bus section-1 with 1 No. of 400 kV bay (GIS). 2) ± 300 MVAr STATCOM with 1x125 MVAr MSC, 2x125 MVAr MSR at KPS1, 400 kV Bus section-2 with 1 No. of 400 kV bay (GIS). 3) ± 300 MVAr STATCOM with 1x125 MVAr MSC, 2x125 MVAr MSR at KPS3, 400 kV Bus section-1 with 1 No. of 400 kV bay (GIS). Note: i) TSPs of KPS1 and KPS3 shall provide space for 1 No. 400 kV bay (each) for termination of STATCOM. ii) Land for installation of STATCOM (with MSC/MSR) as specified above has to be arranged by TSP implementing the STATCOM. iii) Implementation Timeframe: 24 months from date of allocation to implementing agency. 2. Transmission System for Evacuation of Power from RE Projects in Rajgarh 1000 REC Power MW SEZ in Madhya Pradesh – Phase- II Development and Consultancy Scope: Ltd. Sl. Scope of the transmission Scheme Capacity /km No. 1. 400/220 kV, 3x500 MVA ICT 400/220 kV, 500 MVA ICT – augmentation (4th, 5th and 6th) at 3 Nos. Pachora PS 400 kV ICT bays – 3 Nos. 220 kV ICT bays – 3 Nos. 400 kV line bays – 2 Nos. 220 kV line bays – 4 Nos. 400 kV Bus Sectionaliser – 1 set 220 kV Bus Sectionaliser – 1 set6 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 220 kV TBC bay – 1 No. 220 kV BC bay – 1 No. 2. Pachora PS – Ujjain (MPPTCL) Route length – 60 km 400 kV D/c line (Quad ACSR/AAAC/AL59 Moose equivalent) 3. 2 No. of 400 kV line bays at Ujjain 400 kV line bays – 2 (MPPTCL) for Pachora – Ujjain 400 kV D/c line Note: i) MPPTCL to provide space for 2 Nos. of 400 kV line bays at Ujjain for termination of Pachora PS – Ujjain 400 kV D/c line ii) Implementation Timeframe: 24 months from date of allocation to implementing agency. 3. Eastern Region Expansion Scheme-XXXIV (ERES-XXXIV) PFC Consulting Ltd. Scope: Sl. Scope of the Transmission Capacity No. Scheme 1. Establishment of Paradeep 765/400 kV, 1500 MVA ICTs: 2 Nos. 765/400 kV, 2x1500 MVA (7x500 MVA single phase units GIS substation including one spare) Future Provisions: Space 765 kV ICT bays: 2 Nos. for: • 765/400 kV,4x1500 MVA 400 kV ICT bays: 2 Nos. ICTs (13x500 MVA single phase units including one 765 kV, 330 MVAr Bus reactor: 2 Nos. spare) along with (7x110 MVAr single phase units associated ICT bays at including one spare unit for both bus and line reactors) both voltage levels • 400/220 kV, 5x500 MVA 420 kV, 125 MVAr Bus reactor: 2 Nos. ICTs along with associated ICT bays at both voltage 765 kV Bus reactor bays: 2 Nos. levels 400 kV Bus reactor bays: 2 Nos. • 765 kV, 2x330MVAr (7x110 MVAr single phase 765 kV line bays: 2 Nos. units including one spare) [for termination of Angul bus reactor along with (POWERGRID) –Paradeep 765 kV D/c associated bays line along with 765 kV, 1x330 MVAr • 420 kV, 2x125MVAr bus switchable line reactor at Paradeep end reactor along with in both circuits] associated bays • 10 Nos. of 765kV line 765 kV, 330 MVAr (3x110 MVAr bays (along with space for single phase units) switchable line switchable line reactor) reactor along with associated bay and for future lines 500-ohm NGR (with NGR bypass • 12 Nos. of 400 kV line arrangement): 2 Nos. bays (along with space for [at Paradeep end in both circuits of switchable line reactor) Angul (POWERGRID) –Paradeep 765 for future lines kV D/c line][भाग II—खण् ड 3(ii)] भारत का रािपत्र : असाधारण 7 • 12 Nos. of 220 kV line bays for future lines 400 kV line bays: 2 Nos. [for termination of Paradeep – Paradeep • 765 kV bus sectionaliser (OPTCL) 400 kV D/c (Quad) line] bay: 1set • 400 kV bus sectionaliser bay: 1set • 220 kV Bus sectionalizer bay :1set • 220 kV Bus coupler bay: 2 No. • 220 kV Transfer bus coupler bay: 2 No. 2. Angul (POWERGRID) – Paradeep 765 kV D/c line Route length: 190 km along with 765kV, 1x330 MVAr switchable line reactor with 500 ohm NGR (with NGR bypass arrangement) at Paradeep end in both circuits 3. Paradeep – Paradeep Route length: 10 km (OPTCL) 400 kV D/c(Quad) line 4. Extension at Angul 765 kV line bays (along with space for (POWERGRID) S/s future switchable line reactor): 2 Nos. [for termination of Angul (POWERGRID) – Paradeep 765 kV D/c line along with 765 kV, 1x330 MVAr switchable line reactor at Paradeep end in both circuits] 5. *Extension at Paradeep 400 kV GIS line bays: 2 Nos. [for (OPTCL) GIS S/s termination of Paradeep– Paradeep (OPTCL) 400 kV D/c (Quad) line] *As the bus scheme of Paradeep (OPTCL) GIS S/s is one and half breaker scheme, 2 Nos. full diameter i.e. 4 Nos. of GIS bays needs to be implemented in the scheme for requirement of 2 Nos. GIS bays for termination of Paradeep (OPTCL) – Paradeep 400 kV D/c (Quad) line in two different diameters. Utilisation of other 2 Nos. GIS bays of these diameters shall be identified in future. Note: i) Implementation Timeframe: 24 months from date of allocation to implementing agency. ii) POWERGRID shall provide space at Angul (POWERGRID) 765/400 kV S/s for implementation of 2 Nos. of 765 kV line bays (along with space for future switchable line reactor) for termination of Angul (POWERGRID)–Paradeep 765 kV D/c line. iii) OPTCL shall provide space at under implementation Paradeep (OPTCL) 400/220 kV GIS S/s (expected by December 2024) for implementation of 2 Nos. of 400 kV GIS line bays for termination of Paradeep–Paradeep (OPTCL) 400 kV D/c (Quad) line. 2 Nos. full diameter i.e. 4 Nos. GIS bays shall be established. 2. The appointment of the Bid Process Coordinator is subject to the conditions laid down by in the Guidelines issued by Ministry of Power in this regard, as amended from time to time. [F. No. 15/3/2018-Trans- Part(1)] Dr. SAI BABA DARBAMULLA, Jt. Secy. (Trans)8 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] अजधसचू ना नई दिल्ली, 12 मई, 2023 का.आ. 2173(अ).— जिद्युत अजधजनयम, 2003 (2003 की सं. 36) की धारा 63 के अंतगगत पररचाजलत दििा- जनिेिों के पैरा 3 के उप-पैरा 3.2 द्वारा प्रित्त िजियों का प्रयोग करते हुए, केंद्र सरकार ने नीचे िी गई ताजलका में उजल्लजखत रािपत्र अजधसूचना द्वारा िैररफ आधाररत प्रजतस्ट्पधागत्मक बोली के अंतगगत कायागन्ियन हेतु (िीबीसीबी) जनम्नजलजखत पारेषण स्ट्कीम ें अजधसूजचत की थीं/उनका क्षेत्र संिोजधत दकया था: िम स्ट्कीम का नाम रािपत्र अजधसचू ना जिसके द्वारा स्ट्कीम स.ं अजधसजू चत की गई थी 1 चरण-III भाग ग1 के अंतगगत रािस्ट्थान म ें आरईिडे से जिद्युत सां.आ. 5032(अ) दिनांक 06.12.2021 की जनकासी (20 गीगािाि) के जलए पारेषण प्रणाली [फा. सं. 15/3/2018-रांस-पािग (1)] और सां.आ. 1724(अ) दिनांक 13.04.2023 [फा. सं. 15/3/2018-रांस-पािग (1)] 2 चरण-III भाग च के अंतगगत रािस्ट्थान म ें आरईिडे से जिद्युत सां.आ. 5032(अ) दिनांक 06.12.2021 की जनकासी (20 गीगािाि) के जलए पारेषण प्रणाली [फा. सं. 15/3/2018-रांस-पािग (1)] और सां.आ. 1724(अ) दिनांक 13.04.2023 [फा. सं. 15/3/2018-रांस-पािग (1)] 2. अब, केंद्र सरकार ने पारेषण संबंधी राष्ट्रीय सजमजत (एनसीिी) की 12िीं बैठक की जसफाररिों की िांच के पश्चात, उपयुगि िो स्ट्कीमों के कायग-क्षेत्र को संिोजधत करने का जनणगय जलया है। अतः, एतद्द्वारा उपयुगि स्ट्कीमों के कायग- क्षेत्र को जनम् नानुसार संिोजधत दकया िाता हैः िम स्ट्कीम का नाम स्ट्कीम का सिं ोजधत काय-ग क्षत्रे स.ं 1. चरण-III भाग ग1 के अतं गगत 12िीं एनसीिी द्वारा अनुमोदित पररितगनों के अलािा, स्ट्िेिकॉम के रािस्ट्थान में आरईिडे स े जिद्युत की कायागन्ियन की समय-सीमा को बढ़ाकर 24 माह कर दिया गया ह,ै िबदक जनकासी (20 गीगािाि) के जलए पारेषण प्रणाली के अन्य घिकों के कायागन्ियन की समय-सीमा 18 महीने पारेषण प्रणाली ही रहगे ी। 2. चरण-III भाग च के अतं गगत स्ट्िेिकॉम के कायागन्ियन की समय-सीमा को बढ़ाकर 24 माह कर दिया रािस्ट्थान में आरईिडे स े जिद्युत की गया ह,ै िबदक पारेषण प्रणाली के अन्य घिकों के कायागन्ियन की समय- जनकासी (20 गीगािाि) के जलए सीमा 18 महीने ही रहगे ी। पारेषण प्रणाली 3. मूल अजधसूचना के अनुसार इन स्ट्कीमों के जलए बोली प्रदिया समन्ियक अपररिर्तगत रहगें े। [फा. सं. 15/3/2018-रांस-पािग (1)] डॉ. साई बाबा िरभमल्ु ल, संयटु त सजचि (रांस)[भाग II—खण् ड 3(ii)] भारत का रािपत्र : असाधारण 9 NOTIFICATION New Delhi, the 12th May, 2023 S.O. 2173(E).—In exercise of the powers conferred by sub- para 3.2 of the Guidelines circulated under Section 63 of the Electricity Act, 2003 (no. 36 of 2003), the Central Government had notified/ modified scope of following transmission schemes, for implementation under Tariff Based Competitive Bidding (TBCB) mode, vide Gazette Notification mentioned below table: Sl. Name of the Scheme Gazette Notification by which Scheme No. was notified 1. Transmission system for Evacuation of power from REZ in S.O. 5032E dated 6.12.2021 Rajasthan (20 GW) under phase-III Part-C1 [F.No.15/3/2018-Trans-Part(1)] And S.O. 1724E dated 13.04.2023 [F. No. 15/3/2018-Trans-Part(1)] 2. Transmission system for Evacuation of power from REZ in S.O. 5032E dated 6.12.2021 Rajasthan (20 GW) under Phase-III Part-F [F.No.15/3/2018-Trans-Part(1)] And S.O. 1724E dated 13.04.2023 [F. No. 15/3/2018-Trans-Part(1)] 2. Now, the Central Government has decided to modify the scope of above mentioned two schemes, after examining the recommendations of the 12th meeting of National Committee on Transmission (NCT). As such, the scopes/ implementation timeframe of above schemes are hereby modified as mentioned below: Sl. Name of the Scheme Modification in scope/ implementation timeframe of the scheme No. 1. Transmission system for Apart from changes approved by 12th NCT, the implementation timeframe of Evacuation of power from the STATCOM is increased to 24 months, while the implementation REZ in Rajasthan (20 GW) timeframe of other components of the transmission system shall remain 18 under phase-III Part-C1 months. 2. Transmission system for The implementation timeframe of the STATCOM is increased to 24 months, Evacuation of power from while the implementation timeframe of other components of the transmission REZ in Rajasthan (20 GW) system shall remain 18 months. under Phase-III Part-F 3. Bid Process Co-ordinations for those schemes will remain unchanged as per original notification. [F. No. 15/3/2018-Trans- Part(1)] Dr. SAI BABA DARBAMULLA, Jt. Secy. (Trans) Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.