Home India Ministry of Road Transport and Highways Cabinet approves development of 6 lane Greenfield Elevated C...
Date: 2026-07-15 Category: Press Release State: Union Government Country: India

Cabinet approves development of 6 lane Greenfield Elevated Corridor & Ramps/Loops & Foot Over Bridge between National Highway-19 and Varanasi Ring Road in Uttar Pradesh on Hybrid Annuity Model at total Capital Cost of Rs.14447.64 Crore under NH(O)

Issued by Ministry of Road Transport and Highways · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** The Cabinet Committee on Economic Affairs, chaired by Prime Minister Narendra Modi, approved the development of a 46.039 km, 6-lane Greenfield Elevated Corridor connecting NH-19 and Varanasi Ring Road on 15 July 2026. The project will be implemented under the Hybrid Annuity Model (HAM) at a total capital cost of Rs. 14,447.64 crore. Its primary purpose is to decongest Varanasi City, reduce travel times by up to 67%, and strengthen multimodal connectivity under the PM Gati Shakti National Master Plan. **Key Points / Main Content** * **Project Infrastructure and Financials** * Development of a 46.039 km six-lane elevated main carriageway connecting National Highway-19 to the Varanasi Ring Road. * Total capital cost of Rs. 14,447.64 crore, comprising Rs. 6,037.85 crore for civil construction and Rs. 541.11 crore for land acquisition. * Key engineering features include a 910 m iconic cable-stayed bridge over the River Ganga and a 1.32 km extradosed Foot Over Bridge-cum-Major Bridge equipped with travelators. * The project incorporates a Rail Over Bridge, emergency parking bays, noise barriers, and heritage-inspired architectural elements. * **Operational Efficiency and Connectivity** * Designed for an operating speed of 80–100 km/h, reducing average travel time from 60 minutes to 20 minutes across the influence area. * Travel time between NH-19 and Kashi Railway Station is expected to drop from 50 minutes to 25 minutes. * An elevated spur between BHU/Lanka and Samne Ghat will separate through traffic from local traffic to ease congestion at Lanka Junction. * **Strategic Integration** * Alignment with PM Gati Shakti National Master Plan to link one Economic Node (Chandauli SEZ) and one Social Node (Chandauli Aspirational District). * Seamless integration with six major Logistics Nodes, including Lal Bahadur Shastri Airport, Ramnagar IWAI Port, and four key railway stations. * Improved access to major landmarks: Kashi Vishwanath Temple, Banaras Hindu University (BHU), Namo Ghat, and Ramnagar Fort. **Impact Analysis** **Commuters and Local Residents** * **Impact:** Drastic reduction in travel time (up to 67%) and improved road safety through controlled-access movement. The project will significantly decongest the existing city road network and reduce vehicle operating costs and emissions. * **Action Required:** Transition to the new elevated corridor for through-city travel to bypass traditional bottlenecks like Lanka Junction and the urban core. **Tourists and Pilgrims** * **Impact:** Enhanced access to religious and cultural landmarks for the estimated 15 crore annual visitors. Dedicated pedestrian connectivity via travelators to the Kashi Vishwanath Temple will improve the pilgrimage experience. * **Action Required:** Utilize the multimodal connectivity points (rail, air, and water) and the new footbridge infrastructure for safer and faster transit to the Ghats and temples. **Logistics and Industrial Stakeholders (including Chandauli SEZ)** * **Impact:** Improved logistics efficiency and freight movement through seamless connectivity between NH-19, the Ramnagar IWAI Port, and railway junctions. * **Action Required:** Integrate the new high-speed corridor into supply chain routes to benefit from reduced transit times and enhanced multimodal integration. **Ministry of Road Transport & Highways / Implementing Agencies** * **Impact:** Oversight of a transformative urban mobility project under the Hybrid Annuity Model (HAM). * **Action Required:** Manage the civil construction, utility shifting, and land acquisition processes within the allocated budgets to ensure project delivery.

Key Entities Referenced

Ganga Elevated Corridor: A 46.039 km six-lane greenfield project linking NH-19 and the Varanasi Ring Road to decongest urban traffic and improve multimodal connectivity. PM Gati Shakti National Master Plan: The national policy framework for integrated infrastructure and multimodal connectivity that the corridor project is aligned with. Hybrid Annuity Model (HAM): The specific implementation and financial model used for the execution of the project's construction. Varanasi, Uttar Pradesh: The primary location and state where the infrastructure project is situated, focusing on decongesting the city's road network. NH(O): The National Highway (Original) scheme/program under which the project's total capital cost is sanctioned.
Official Source Record View Original Source →
See Full Document Text
Ministry of Road Transport & Highways Cabinet approves development of 6 lane Greenfield Elevated Corridor & Ramps/Loops & Foot Over Bridge between National Highway-19 and Varanasi Ring Road in Uttar Pradesh on Hybrid Annuity Model at total Capital Cost of Rs.14447.64 Crore under NH(O) प्रव तथ: 15 JUL 2026 3:46PM by PIB Delhi The Cabinet Committee on Economic Affairs, chaired by the Prime Minister Shri Narendra Modi, today has approved the development of a Link/Connector Corridor between National Highway-19 (NH-19) and the Varanasi Ring Road with riverbank connectivity along the River Ganga for the decongestion of Varanasi City in Uttar Pradesh. The 46.039 km project, comprising a six-lane elevated main carriageway, an iconic cable-stayed bridge, an extradosed Foot Over Bridge-cum-Major Bridge, loops, ramps, link roads and service roads, will be implemented under the Hybrid Annuity Model (HAM) at a total capital cost of Rs.14,447.64 crore including a civil construction cost of Rs.6,037.85 crore (including utility shifting, excluding GST) and a land acquisition cost of Rs.541.11 crore under NH(O). The project will provide seamless connectivity between NH-19 and the Varanasi Ring Road, significantly decongesting the city’s road network and improving urban mobility. Designed for an operating speed of 80–100 km/h, it is expected to reduce the average travel time across the project influence area from approximately 60 minutes to 20 minutes, representing a reduction of nearly 67 per cent. Travel time between NH-19 and Kashi Railway Station will be reduced from approximately 50 minutes to about 25 minutes, resulting in a saving of about 25 minutes (nearly 50 per cent). Aligned with the PM Gati Shakti National Master Plan, the corridor will strengthen multimodal connectivity by providing seamless access to major highways, railway stations, Lal Bahadur Shastri Airport and Ramnagar IWAI Port, while significantly improving connectivity to key religious, educational and cultural landmarks, including the Kashi Vishwanath Temple, Banaras Hindu University (BHU), Namo Ghat, Ramnagar Fort and the Ghats of Varanasi. By linking important economic, social and logistics nodes, the project will improve logistics efficiency, enhance road safety, facilitate tourism and pilgrimage, and support sustainable regional economic growth across eastern Uttar Pradesh. The corridor has been conceived as a transformative urban mobility project to decongest the road network of Varanasi & Chandauli by providing a high-speed, access-controlled connection between NH-19, the Varanasi Ring Road (NH-135B), Ramnagar/ BHU and other major urban destinations. With more than 15 crore tourists and pilgrims visiting Varanasi every year, the project will significantly improve connectivity to major religious, educational and cultural landmarks, including the Kashi Vishwanath Temple, Banaras Hindu University (BHU), Namo Ghat, Ramnagar Fort, the Ghats of Varanasi, and Kashi Railway Station,while substantially reducing congestion on the existing city road network. An elevated spur between BHU/Lanka and Samne Ghat will further ease traffic congestion at the heavily trafficked Lanka Junction by separating through traffic from local traffic movements. The project will improve road safety through controlled-access movement, reduce vehicle operating costs and emissions, enhance travel reliability, and facilitate the efficient movement of passenger and freight traffic. It will also decongest NH-19, the BHU-Ramnagar Corridor and NH-35 by diverting through traffic away from the densely developed urban core. The project incorporates several landmark engineering features, including an iconic 910 m cable-stayed bridge across the River Ganga, a 1.32 km extradosed Foot Over Bridge-cum-Major Bridge with travelators providing seamless pedestrian connectivity to the Kashi Vishwanath Temple, a Rail Over Bridge over the existing/proposed Malviya Bridge, dedicated emergency parking bays, noise barriers, façade lighting and architectural elements inspired by the cultural heritage of Varanasi. These features will not only improve transportation efficiency but also enhance the city’s urban landscape, create an iconic addition to Varanasi’s skyline, and reinforce its position as one of India’s foremost religious and cultural destinations. Planned in accordance with the PM Gati Shakti National Master Plan, the corridor will strengthen multimodal connectivity by linking one Economic Node (Chandauli SEZ), one Social Node (Chandauli Aspirational District) and six major Logistics Nodes, namely Lal Bahadur Shastri Airport, Kashi Railway Station, Banaras Railway Station, Varanasi City Railway Station, Pt. Deen Dayal Upadhyay Junction and Ramnagar IWAI Port. By providing seamless connectivity between these transport hubs and key destinations such as the Kashi Vishwanath Temple, Banaras Hindu University (BHU), Namo Ghat, Ramnagar Fort and the Ghats of Varanasi, the project will enhance multimodal integration, improve logistics efficiency, facilitate tourism and pilgrimage, and support sustainable regional economic development across eastern Uttar Pradesh. Overall, the proposed Ganga Elevated Corridor will create a modern, high-capacity urban transport corridor that transforms mobility in Varanasi by providing faster, safer and more reliable connectivity, significantly reducing congestion, strengthening multimodal integration, enhancing tourism and pilgrimage infrastructure, and supporting sustainable economic growth in line with the vision of PM Gati Shakti and Viksit Bharat. Map of Corridor:*** MJPS (रलीज़ आईडी: 2284813) आगंतुक पटल : 1068 इस वज्ञ को इन भाषाओ ंम पढ़: Malayalam , Urdu , Marathi , ही , Punjabi , Gujarati , Tamil , Kannada

Continue your research