Date: 2026-05-13Category: Press ReleaseState: Union GovernmentCountry: India
Cabinet approves one new project covering Ahmedabad District in the state of Gujarat, increasing the existing network of Indian Railways by about 134 Kms
**Executive Summary**
The Cabinet Committee on Economic Affairs has approved the Ahmedabad (Sarkhej) – Dholera Semi High-Speed Double Line project in Gujarat, estimated to cost Rs 20,667 crore. This 134 km project represents Indian Railways’ first semi high-speed line utilizing indigenously developed technology and is scheduled for completion by 2030-31. It aims to enhance multi-modal connectivity, reduce travel time, and support environmental goals under the PM-Gati Shakti National Master Plan.
**Key Points / Main Content**
* **Project Infrastructure and Technology**
* Approves the construction of a 134 km semi high-speed double line connecting Ahmedabad (Sarkhej) to Dholera.
* Introduces the first semi high-speed project for Indian Railways developed with indigenous technology.
* Serves as a reference model for the future phased expansion of semi high-speed rail across India.
* **Connectivity and Mobility**
* Links key hubs including Dholera SIR, the upcoming Dholera Airport, and the Lothal National Maritime Heritage Complex (NHMC).
* Facilitates same-day return trips and comfortable daily commuting by significantly cutting passenger travel time.
* Provides direct connectivity to approximately 284 villages, benefiting a population of around 5 lakhs.
* **Strategic and Economic Alignment**
* Developed under the PM-Gati Shakti National Master Plan to improve multi-modal connectivity and logistic efficiency.
* Supports the "Atmanirbhar" vision by enhancing employment and self-employment opportunities in the region through comprehensive development.
* Aims to provide seamless movement for people, goods, and services.
* **Environmental Impact**
* Contributes to climate goals by reducing oil imports by approximately 0.48 crore litres.
* Estimates a reduction in CO2 emissions by 2 crore kg, equivalent to planting 10 lakh trees.
* Lowers national logistics costs through energy-efficient transportation.
**Impact Analysis**
**Ministry of Railways / Indian Railways**
**Impact**
The Ministry will manage its first semi high-speed project using domestic technology, expanding the existing network by 134 km and improving service reliability and efficiency.
**Action Required**
Oversee project implementation, ensure the integration of indigenous technology, and follow the PM-Gati Shakti National Master Plan guidelines for stakeholder consultation.
**Local Population and Commuters**
**Impact**
Residents of 284 villages and the broader Ahmedabad district will gain faster, direct access to urban hubs, increasing their mobility and access to employment.
**Action Required**
Prepare for a transition to rail-based commuting and leverage improved connectivity for regional economic activities.
**Industrial and Logistics Sector (Dholera SIR / Dholera Airport)**
**Impact**
Industries will benefit from reduced logistics costs and seamless multi-modal connectivity for the movement of goods and services.
**Action Required**
Incorporate the new semi high-speed rail capacity into supply chain and logistics planning to maximize efficiency and regional development.
Key Entities Referenced
Ahmedabad (Sarkhej) – Dholera Semi High-Speed Double Line project: Indian Railways’ first semi high-speed rail project spanning 134 km, approved for construction using indigenous technology.
Cabinet Committee on Economic Affairs (CCEA): The high-level government body chaired by the Prime Minister that granted formal approval for the railway project.
PM-Gati Shakti National Master Plan: A national strategic framework for multi-modal connectivity and integrated planning under which this project is developed.
Ministry of Railways: The primary government ministry responsible for the execution, oversight, and operation of the new semi high-speed rail line.
Ahmedabad District, Gujarat: The central geographical location where the 134 km railway network expansion and infrastructure development will take place.
Ministry of Railways
Cabinet approves one new project covering
Ahmedabad District in the state of Gujarat,
increasing the existing network of Indian
Railways by about 134 Kms
The total estimated cost of the project is Rs 20,667 crore
(approx.) and will be completed up to 2030-31
Posted On: 13 MAY 2026 3:36PM by PIB Delhi
The Cabinet Committee on Economic Affairs, chaired by the Prime Minister Shri Narendra Modi, today
has approved Ahmedabad (Sarkhej) – Dholera Semi High-Speed Double Line project of Ministry of
Railways with total cost of Rs. 20,667 crore (approx.). It will be Indian Railways 1st semi high-speed
project, planned with indigenously developed technology.
The project section will provide faster connectivity between Ahmedabad, Dholera SIR, upcoming Dholera
Airport and Lothal National Maritime Heritage Complex (NHMC). Connecting Ahmedabad with Dholera
will cut down passenger travel time enabling comfortable daily commuting and same-day return trips.
This semi high speed railway would not only bring two cities closer but also bring the people living
hundreds of kilometers away, closer to each other.
As India’s first semi high-speed rail project, the project will serve as a pioneer project acting as a reference
model for the phased expansion of semi high-speed rail across the country.
The new line proposal will provide direct connectivity and improve mobility, providing enhanced
efficiency and service reliability for Indian Railways. The project is in line with the Hon’ble Prime
Minister Shri Narendra Modiji’s Vision of a New India which will make people of the region
“Atmanirbhar” by way of comprehensive development in the area which will enhance their employment/
self-employment opportunities.
The project is planned on PM-Gati Shakti National Master Plan with focus on enhancing multi-modal
connectivity & logistic efficiency through integrated planning and stakeholder consultations. These
projects will provide seamless connectivity for movement of people, goods, and services.
The project covering Ahmedabad district in Gujarat will increase the existing network of Indian Railways
by about 134 Kms.
The proposed projects will enhance connectivity to approx. 284 villages, which are having a population of
about 5 lakhs.
The Railways being environment friendly and energy efficient mode of transportation, will help both in
achieving climate goals and minimizing logistics cost of the country, reduce oil import (0.48 Crore Litres)
and lower CO2 emissions (2 Crore Kg) which is equivalent to plantation of 10 (Ten) Lakh trees.****
MJPS
(Release ID: 2260626) Visitor Counter : 418
Read this release in: Urdu , ही , Marathi , Punjabi , Gujarati , Tamil , Kannada , Malayalam