Home India Ministry of Road Transport and Highways Cabinet approves Rehabilitation and upgradation of Ghoti – T...
Date: 2026-02-14 Category: Press Release State: Union Government Country: India

Cabinet approves Rehabilitation and upgradation of Ghoti – Trimbak (Mokhada) – Jawhar – Manor – Palghar section of NH-160A to 2 Lane /4 Lane with paved shoulder configuration with a Total Length of 154.635 km and Total Capital Cost of Rs.3320.38 crore in Maharashtra

Issued by Ministry of Road Transport and Highways · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** The Cabinet Committee on Economic Affairs has approved the rehabilitation and upgradation of the Ghoti-Trimbak (Mokhada)–Jawhar-Manor-Palghar section of NH-160A in Maharashtra. The project aims to improve connectivity, reduce congestion, and boost economic development in the region. The total project cost is Rs. 3,320.38 crore, covering a length of 154.635 km and is targeted to have an upgradation completed by 2028. **Key Points / Main Content** * **Project Scope:** * Rehabilitation and upgradation of NH-160A on Engineering, Procurement, and Construction (EPC) mode. * Conversion to 2-lane/4-lane with paved shoulder configuration. * Total length: 154.635 km. * Corridor: Sinnar to Palghar NH 160A. * **Financials:** * Total Capital Cost: Rs. 3,320.38 crore. * Total Civil Cost: Rs. 2,594.49 crore. * Land Acquisition Cost: Rs. 725.89 crore. * **Traffic & Connectivity:** * Connects to Delhi-Mumbai Expressway (NE-4) and Mumbai-Nagpur Samruddhi Mahamarg. * Connects to National Highways NH-848 and NH-48. * Connects to State Highways SH-04, SH-73, SH-76, SH-77, SH-78, and SH-30. * Provides an alternative route to bypass Nashik city, reducing congestion. * Connects 6 PM Gati Shakti Economic Nodes, 1 Social Node, and 8 Logistics Nodes. * **Anticipated Benefits:** * Smoother and safer traffic flow. * Reduction in travel time and Vehicle Operating Cost (VOC). * Basic infrastructure enhancement in the tribal region. * Estimated generation of 19.98 lakh person-days of direct employment and 24.86 lakh person-days of indirect employment. * **Traffic Volumes (FY-25):** * Ghoti - Trimbak section: 6,700 PCU/day * Trimbak (Mokhada) – Manor section: 4,323 PCU/day * Manor - Palghar section: 12,455 PCU/day **Impact Analysis** **Residents and Businesses in the Region West of Nashik** * **Impact:** Improved infrastructure will spur economic growth and provide more efficient transportation of goods and people. * **Action Required:** None specified **Commuters and Freight Carriers** * **Impact:** Reduced travel time, lower vehicle operating costs, and safer traffic flow. * **Action Required:** None specified **Government Agencies (Specifically MIDC)** * **Impact:** Enhanced logistics and connectivity for industrial units developed by the Maharashtra Industrial Development Corporation (MIDC). The upgrade aligns with the PM GatiShakti principles. * **Action Required:** Monitor the project's progress and coordinate efforts to maximize its impact on the Logistic Performance Index (LPI) of the country. **Employment Seekers in the Region** * **Impact:** The project is expected to generate a significant number of direct and indirect employment opportunities * **Action Required:** None specified

Key Entities Referenced

NH-160A: National Highway 160A, the section undergoing rehabilitation and upgradation. Cabinet Committee on Economic Affairs: The committee that approved the rehabilitation and upgradation project. PM GatiShakti: The national master plan for multi-modal connectivity, aligning with the project's principles. Maharashtra: The state where the project is located.
Official Source Record View Original Source →
See Full Document Text
Ministry of Road Transport & Highways Cabinet approves Rehabilitation and upgradation of Ghoti – Trimbak (Mokhada) – Jawhar – Manor – Palghar section of NH-160A to 2 Lane /4 Lane with paved shoulder configuration with a Total Length of 154.635 km and Total Capital Cost of Rs.3320.38 crore in Maharashtra Posted On: 14 FEB 2026 1:49PM by PIB Delhi The Cabinet Committee on Economic Affairs, chaired by the Prime Minister Shri Narendra Modi, yesterday has approved the rehabilitation and upgradation of the Ghoti–Trimbak (Mokhada)–Jawhar– Manor–Palghar section of NH-160A in Maharashtra on Engineering, Procurement and Construction (EPC) mode, with a total length of 154.635 km and a total capital cost of Rs.3,320.38 crore. The region west of Nashik, particularly around Ambad and Satpur, hosts a dense cluster of industrial units developed by Maharashtra Industrial Development Corporation. This generates significant freight traffic. At present, this traffic moves through Nashik city via NH-848, adding pressure on urban roads. Existing major routes are already operating near Level of Service (LOS) – C levels: NH-848 (6L) from Mumbai: 50,000–60,000 PCU/day (LOS-C: 55,000) NH-60 (4L) from Pune: 40,000–50,000 PCU/day (LOS-C: 36,000) Upgradation of NH-160A will provide an alternate route from these industrial areas via Triambak, bypassing the city and reducing congestion. The traffic from Mumbai (west side) and Southern side is expected to use Samrudhi Expressway through the interchange at Igatpuri on NH-848. Thereafter, the traffic would travel on NH-848 upto Ghoti and use NH-160A for travel to Trimbak and Nashik. From 2028 onwards, projected daily traffic exceeds 10,000 PCUs, qualifying the corridor for 4-laning. The section of NH-160A extending westward from Trimbak toward Manor and Palghar connects NH- 160A to Delhi-Mumbai Expressway (NE-4), NH-48 and onward to the western coastal belt, as well as tribal areas of Palghar District. Though this link is at present having 4,500 PCUs traffic, development of existing intermediate-lane carriageway to two-lanes with paved shoulders will facilitate smoother movement of both freight and passenger traffic. Also, the stretch from Manor to Palghar passes through urban built-up sections with traffic of about 12,000 PCUs, upgradation to four-lanes has been proposed for smoother movement in this urban section. The project has been proposed in line with the PM GatiShakti principles and will connect 6 PM GatiShakti Economic Nodes, 01 Social Nodes and 8 Logistics Nodes in the State of Maharashtra. This will have a positive impact on the Logistic Performance Index (LPI) of the country.Upon completion, the project will also facilitate smooth and safe traffic flow, substantial reduction in travel time, and a notable decrease in Vehicle Operating Cost (VOC). Additionally, the implementation of the project will enhance the basic infrastructure in the tribal region, contributing to overall economic development. The project is also estimated to generate approximately 19.98 lakh person-days of direct employment and 24.86 lakh person-days of indirect employment, besides inducing additional economic activity along the corridor. Map of Corridor Project Details Feature Details Project Name Rehabilitation and upgradation of Ghoti – Trimbak (Mokhada) – Jawhar – Manor – Palghar section of NH-160A to 2 Lane /4 Lane with paved shoulder configuration and in the state of Maharashtra on Engineering, Procurement and Construction (EPC) Mode. Corridor Sinnar to Palghar NH 160A Length (km) 154.635 Total Civil Cost (Rs Cr.) 2594.49 Land Acquisition Cost (Rs Cr.) 725.89 Total Capital Cost (Rs Cr.) 3320.38Mode Engineering, Procurement and Construction (EPC) Mode Major Roads Connected Expressways: Delhi–Mumbai Expressway (NE-4) and Mumbai-Nagpur Samruddhi Mahamarg National Highways: NH-848 and NH-48. State Highways – SH-04, SH-73, SH-76, SH-77, SH- 78 and SH-30 Economic / Social / Transport 06 PM Gati Shakti Economic Nodes: Nodes Connected 02 SEZs- Tarapur & Boisar, 02 Industrial Parks- Palghar & Mokhada, 02 Industrial Co-Operative Estates- Wada & Tarapur, 07 Social Nodes: 1 Tribal district- Palghar, 06 Tourist Places- Trimbakeshwar, Jawhar Rajwada, Vaitarna River, Kevla Beech, Arnala Fort, Tungeshwar Sanctuary), 08 logistics nodes: 03 Major Railway Station- Palghar Nashik & Shirdi, 03 Airport- Ozar, Shirdi & Mumbai, 02 Ports- Vadhavan & JNPT Major Cities / Towns Connected Trimbak (Mokhada), Jawhar, Manor, Palghar, Mumbai, Nashik Employment Generation ~19.98 lakh person-days of direct employment Potential ~24.86 lakh person-days of indirect employmentAnnual Average Daily Traffic Ghoti – Trimbak section: (AADT) in FY-25 6,700 PCU/day Trimbak (Mokhada) – Manor section: 4,323 PCU/day Manor – Palghar section: 12,455 PCU/day **** MJPS/VJ (Release ID: 2228000) Visitor Counter : 174 Read this release in: Urdu , ही , Marathi , Gujarati , Malayalam

Continue your research