Home India Ministry of Road Transport and Highways Cabinet approves widening and improvement of existing highwa...
Date: 2025-10-01 Category: Not Applicable State: Union Government Country: India

Cabinet approves widening and improvement of existing highway to 4 lane of Kalibor- Numaligarh section of NH-715 in Assam

Issued by Ministry of Road Transport and Highways · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

On October 1, 2025, the Cabinet Committee on Economic Affairs (CCEA) approved the widening and improvement of the existing carriageway to a 4-lane highway on the Kalibor-Numaligarh section of NH-715 in Assam. This project includes implementation of Wildlife friendly measures proposed on Kaziranga National Park (KNP) Stretch. The total length of the carriageway is 85.675 km with a total capital cost of Rs. 6957 crore. The project will be developed on an Engineering, Procurement and Construction (EPC) Mode. The project involves the construction of an elevated corridor of about 34.5 km, upgrading 30.22 km of existing road, and constructing 21 km of greenfield bypasses. The project alignment integrates with 2 major National Highways (NH-127, NH-129) and 1 State Highways (SH-35). The upgraded corridor will enhance multi-modal integration by connecting with 3 Railway Stations (Nagaon, Jakhalabandha, Vishwanath Charli), and 3 Airports (Tezpur, Liabari, Jorhat). The project alignment improves connectivity to 02 Socio-Economic Nodes, 08 Tourist and religious places. The project will generate approximately 15.42 lakh person-days of direct and 19.19 lakh person-days of indirect employment. The annual average daily traffic (AADT) in FY-25 is estimated at 13,800 Passenger Car Units (PCU).

Key Entities Referenced

NH-715: National Highway 715, subject of widening and improvement. Kaziranga National Park (KNP): The project includes implementation of wildlife-friendly measures proposed within the Kaziranga National Park stretch. Assam: The state where the project is located and whose connectivity will be improved. Ministry of Road Transport & Highways: The central ministry with purview over the project.
Official Source Record View Original Source →
See Full Document Text
Ministry of Road Transport & Highways Cabinet approves widening and improvement of existing highway to 4 lane of Kalibor- Numaligarh section of NH-715 in Assam Includes implementation of Wildlife friendly Measures proposed on Kaziranga National Park (KNP) Stretch Total length of carriageway is 85.675 km with financial implication of Rs.6957 crore Posted On: 01 OCT 2025 3:29PM by PIB Delhi The Cabinet Committee on Economic Affairs (CCEA) chaired by the Prime Minister Shri Narendra Modi, has approved widening and improvement of existing carriageway to 4 lane of Kalibor- Numaligarh section of NH- 715 including Implementation of Wildlife friendly Measures Proposed on Kaziranga National Park (KNP) Stretch in Assam. The project will be developed on on Engineering, Procurement and Construction (EPC) Mode with a Total Length of 85.675 km and Total Capital Cost of Rs.6957 crore. The existing Kalibor- Numaligarh section of NH-715 (old NH-37) has a configuration of 2-lane with/without paved shoulders, passing through densely built-up areas of Jakhlabandha (Nagaon) and Bokakhat (Golaghat) towns. A major part of the existing highway passes either through the Kaziranga National Park or along the southern boundary of the park, having restricted right of way (ROW) of 16 to 32 metres further aggravated by substantially poor geometrics. During the monsoons, the area inside the park gets flooded leading to the movement of the wildlife from the park towards the elevated Karbi-Anglong Hills by crossing the existing highway. The heavy round-the-clock traffic on the highway results in frequent accidents and deaths of wild animals. To address these challenges, the project will involve construction of an elevated corridor of about 34.5 km, covering entire cross movement of wildlife from Kaziranga National Park to Karbi- Anglong Hills for free and un-interrupted passage of wildlife along with upgradation of 30.22 km of existing road and construct a 21 kms of greenfield bypasses around Jakhalabandha and Bokakhat. This will decongest the existing corridor, improve safety, and enhance the direct connectivity between Guwahati (the State Capital), Kaziranga National Park (tourism destination), and Numaligarh (an industrial town). The project alignment integrates with 2 major National Highways (NH-127, NH-129) and 1 State Highways (SH-35), providing seamless connectivity to key economic, social, and logistics nodes across Assam. Additionally, the upgraded corridor will enhance multi-modal integration by connecting with 3 Railway Stations (Nagaon, Jakhalabandha, Vishwanath Charli), and 3 Airports (Tezpur, Liabari, Jorhat) thereby facilitating faster movement of goods and passengers across the region. The project alignment improves connectivity to 02 Socio-Economic Nodes, 08 Tourist and religious places, thereby strengthening regional economic growth and religious tourism. Upon completion, the Kalibor- Numaligarh section will play a pivotal role in regional economic growth, strengthening connectivity between major tourism, industrial and economic centers, boosting tourism toKaziranga National Park, and opening new avenues for trade and industrial development. The project will also generate approximately 15.42 lakh person-days of direct and 19.19 lakh person-days of indirect employment, and will open new avenues of growth, development and prosperity in surrounding regions. Feature Details Widening and Improvement of existing carriageway to 4 lane of Kalibor- Project Name Numaligarh section of NH-715 including Implementation of Wildlife friendly Measures Proposed on Kaziranga National Park (KNP) Stretch in Assam Corridor NH-715 Length (km) 85.675 Elevated Corridor Length passing 34.45 kms through Kaziranga National Park Puducherry Bypass (Greenfield) – 11.5 km Bypasses Bokakhat Bypass (Greenfield)- 9.5 km At- Grade widening of existing Road (2 30.22 kms to 4 lane) Total Civil Cost (Rs Cr.) 4,829 Land Acquisition Cost (Rs Cr.) 622 Total Capital Cost (Rs Cr.) 6,957 Mode Engineering, Procurement and Construction (EPC) National Highways – NH-127, NH-129 Major Roads Connected State Highways – SH-35 Airports: Tezpur, Liabari, Jorhat Railway Stations: Nagaon, Jakhalabandha, Vishwanath Chariali Economic Nodes: Tezpur Fishing cluster, Nagaon Fishing cluster Economic / Social / Transport Nodes/ Social Nodes: Karbi Anglong (Tribal District) and Tribal Wokha (Tribal Tourist Places/ Religious Places District) Connected Tourist places: Kaziranga National Park, Deopahar Archaeological Site- Numaligarh, Kakochang Waterfall Religious places: Baba Than (Lord Shiva Temple)-Numaligarh, Maha Mrityunjay Temple- Nagaon, Hatimura Temple- Nagaon Major Cities / Towns Connected Guwahati, Nagaon, Golaghat, Numaligarh, Jorhat Employment Generation Potential 15.42 lakh Man-Days (direct) & 19.19 lakh Man-Days (indirect) Annual Average Daily Traffic (AADT) Estimated at 13,800 Passenger Car Units (PCU) in FY-25 Map of Corridor*** MJPS/SKS (Release ID: 2173563)

Continue your research