Date: 2025-12-31Category: Press ReleaseState: Union GovernmentCountry: India
Cabinet approves Widening and Strengthening of existing 2-Lane to 2-Lane with Paved Shoulder from Km 68.600 to Km 311.700 of NH-326 in Odisha on EPC mode worth Rs.1526.21 crore
**Executive Summary**
The Union Cabinet has approved the widening and strengthening of an existing 2-lane stretch of National Highway 326 (NH-326) in Odisha from Km 68.600 to Km 311.700. The project will be executed on EPC mode with a total capital cost of Rs. 1526.21 crore. The targeted completion time for each package is 24 months, followed by a five-year defect liability/maintenance period.
**Key Points / Main Content**
* **Project Overview:**
* Widening and strengthening of existing 2-lane to 2-lane with paved shoulder.
* Location: NH-326 in Odisha, from Km 68.600 to Km 311.700.
* Execution Mode: EPC (Engineering, Procurement, and Construction).
* **Financial Details:**
* Total capital cost: Rs. 1526.21 crore.
* Civil construction cost: Rs. 966.79 crore.
* **Benefits:**
* Faster, safer, and more reliable travel.
* Overall development of southern Odisha, particularly benefiting Gajapati, Rayagada, and Koraput districts.
* Improved connectivity to local communities, industries, educational institutions, and tourism centers.
* **Project Details:**
* Upgrade the corridor to 2-lane with paved shoulders with geometric corrections.
* Removal of black spots and pavement strengthening.
* Provides direct and improved connectivity from Mohana-Koraput to major economic and logistics corridors.
* Connects important industrial and logistic nodes, and education/tourism hubs.
* **Implementation:**
* Implementation on EPC mode, with contractors using proven construction technologies.
* Quality and progress will be verified through specialized survey and monitoring tools.
* Day-to-day supervision by an appointed Authority Engineer.
* **Timeline:**
* Targeted completion: 24 months from the appointed date for each package.
* Defect liability/maintenance period: 5 years (total contract engagement of 7 years).
**Impact Analysis**
**Stakeholder: Residents of Gajapati, Rayagada, and Koraput districts**
* **Impact:** Improved road connectivity, resulting in faster, safer, and more reliable travel.
* **Action Required:** None specified.
**Stakeholder: Local Businesses and Industries**
* **Impact:** Enhanced access to markets, healthcare, and employment opportunities.
* **Action Required:** None specified.
**Stakeholder: Contractors**
* **Impact:** Opportunity to bid for and execute the EPC project.
* **Action Required:** Adopt proven construction and quality-assurance technologies.
**Stakeholder: Odisha State Government**
* **Impact:** Improved infrastructure, economic development, and connectivity.
* **Action Required:** Ensure statutory clearances and land possession are completed.
Key Entities Referenced
NH-326: National Highway 326 in Odisha being widened and strengthened.
Odisha: The state where the NH-326 widening and strengthening project is located, specifically in southern Odisha.
EPC mode: Engineering, Procurement, and Construction mode, the contracting method for the project.
Union Cabinet: The approving authority for the widening and strengthening of NH-326.
Ministry of Road Transport & Highways
Cabinet approves Widening and Strengthening of
existing 2-Lane to 2-Lane with Paved Shoulder
from Km 68.600 to Km 311.700 of NH-326 in
Odisha on EPC mode worth Rs.1526.21 crore
प्रव तथ: 31 DEC 2025 3:14PM by PIB Delhi
The Union Cabinet chaired by the Prime Minister Shri Narendra Modi today approved the widening and
strengthening of existing 2-Lane to 2-Lane with Paved Shoulder from Km 68.600 to Km 311.700 of NH-
326 in the State of Odisha under NH(O) on EPC mode.
Financial implications:
The total capital cost for the project is Rs.1,526.21 crore, which includes a civil construction cost of
Rs.966.79 crore.
Benefits:
The upgradation of NH-326 will make travel faster, safer, and more reliable, resulting in overall
development of southern Odisha, particularly benefiting the districts of Gajapati, Rayagada, and Koraput.
Improved road connectivity will directly benefit local communities, industries, educational institutions,
and tourism centres by enhancing access to markets, healthcare, and employment opportunities, thereby
contributing to the region’s inclusive growth.
Details:
The section of Mohana–Koraput of the National Highway (NH-326) at present have sub-standard
geometry (intermediate lane/2-lane, many deficient curves and steep gradients); the existing road
alignment, carriageway width and geometric deficiencies constrain safe, efficient movement of heavy
vehicles and reduce freight throughput to coastal ports and industrial centres. These constraints will be
removed by upgrading the corridor to 2-lane with paved shoulders with geometric corrections (curve
realignments and gradient improvements), removal of black spots and pavement strengthening, enabling
safe and uninterrupted movement of goods and passengers and reducing vehicle operating costs.
The upgradation will provide direct and improved connectivity from Mohana–Koraput into major
economic and logistics corridors — linking with NH-26, NH-59, NH-16 and the Raipur–Visakhapatnam
corridor and improving last-mile access to Gopalpur port, Jeypore airport and several railway stations. The
corridor connects important industrial and logistic nodes (JK Paper, Mega Food Park, NALCO, IMFA,
Utkal Alumina, Vedanta, HAL) and education/tourism hubs (Central University of Odisha, Koraput
Medical College, Taptapani, Rayagada), thereby facilitating faster freight movement, reducing travel time
and enabling regional economic development.
The project lies in southern Odisha (districts of Gajapati, Rayagada and Koraput) and will significantly
improve intra-state and inter-state connectivity by making vehicle movement faster and safer, stimulating
industrial and tourism growth and improving access to services in aspirational and tribal areas. Economic
analysis shows the project’s EIRR at 17.95% (base case) while the financial return (FIRR) is negative(-2.32%), reflecting the social and non-market benefits captured in the economic appraisal; the economic
justification is driven largely by travel-time and vehicle-operating-cost savings and safety benefits
(including an estimated travel-time saving of about 2.5–3.0 hours and a distance saving of ~12.46 km
between Mohana and Koraput after geometric improvements).
Implementation strategy and targets:
The work will be implemented on EPC mode. Contractors will be required to adopt proven construction
and quality-assurance technologies, which may include precast box-type structures and precast drains,
precast RCC/PSC girders for bridges and grade separators, precast crash barriers and friction slabs on
Reinforced-Earth wall portions, and Cement Treated Sub-Base (CTSB) in pavement layers. Quality and
progress will be verified through specialized survey and monitoring tools such as Network Survey Vehicle
(NSV), periodic drone-mapping. Day-to-day supervision will be carried out by an appointed Authority
Engineer and project monitoring will be conducted through the Project Monitoring Information System
(PMIS).
The work is targeted to be completed in 24 months from the appointed date for each package, followed by
a five-year defect liability/maintenance period (total contract engagement envisaged as 7 years: 2 years
construction + 5 years DLP). Contract award will follow after completion of statutory clearances and
required land possession.
Major impact, including employment generation potential:
This project is aimed at providing faster and safer movement of traffic and improving connectivity
between the southern and eastern parts of Odisha, particularly linking the districts of Gajapati, Rayagada,
and Koraput with the rest of the State and neighbouring Andhra Pradesh. The improved road network will
facilitate industrial growth, promote tourism, enhance access to education and healthcare facilities, and
contribute to the overall socio-economic development of the tribal and backward regions of southern
Odisha.
Various activities undertaken during the construction and maintenance period are expected to generate
significant direct and indirect employment opportunities for skilled, semi-skilled and unskilled workers.
The project will also boost local industries involved in the supply of construction materials, transportation,
equipment maintenance, and related services, thus supporting the regional economy.
The project is located in the State of Odisha and traverses three districts — Gajapati, Rayagada, and
Koraput. The corridor connects major towns such as Mohana, Rayagada, Laxmipur, and Koraput,
providing improved intra-state connectivity within Odisha and enhancing inter-state linkage with Andhra
Pradesh through the southern end of NH-326.
Background:
Government has declared the stretch “the Highway starting from its junction with NH-59 near Aska,
passing through Mohana, Raipanka, Amalabhata, Rayagada, Laxmipur and terminating at its junction with
NH-30 near Chinturu in the State of Odisha” as NH-326 vide Gazette Notification dated 14th August
2012.
***
MJPS
(रलीज़ आईडी: 2210109) आगंतुक पटल : 845
इस वज्ञ को इन भाषाओ ंम पढ़: Urdu , Marathi , ही , Punjabi , Gujarati , Malayalam