**Executive Summary**
This document, Civil Aviation Requirements (CAR) Section 9, Series L Part IX, issued by the Directorate General of Civil Aviation (DGCA) on December 17, 2018, effective immediately, outlines the requirements for the approval, renewal, and oversight of training organizations for Air Traffic Services (ATS) personnel. It details the application process, necessary documentation, and the responsibilities of Air Traffic Services Training Organizations (ATSTO). Key actions include ATSTO application submission and compliance with outlined regulations.
**Key Points / Main Content**
* **Applicability and Scope:**
* Applies to all training organizations conducting approved training courses for students seeking licenses or ratings specified in Rule 95 of Aircraft Rules 1937.
* All such organizations will be named as Air Traffic Services Training Organization (ATSTO).
* Air Navigation Service Providers (ANSP) providing air traffic services shall apply for grant of approval of ATSTO.
* **Approval of ATSTO:**
* Application must be made to DGCA through eGCA with prescribed fee as per Rule 114(10) of Aircraft Rules 1937 via bharatkosh.gov.in.
* Required documentation includes:
* Statement of minimum qualification requirements for each management position.
* Proposed training authorizations.
* Proposed location of training and satellite facilities.
* Two copies of Training and Procedures Manual (TPM), Quality Assurance (QA) Manual, and Examination Procedure Manual (EPM).
* Two copies of each training course curriculum.
* Statement of maximum student/trainee capacity.
* Copy of contract for outsourced facilities or equipment.
* Statement of compliance with all applicable CARs.
* Any additional information required by DGCA.
* Supplementary documents.
* **Process of Approval and Certificate:**
* ATSTO will be informed of inspection/audit by DGCA team and ATSTO post holders.
* DGCA team will assess ATSTO's compliance with qualifications, competence, facilities, training system, syllabi, and QA system.
* DGCA may grant approval upon satisfactory compliance; provisional or part approval is discretionary.
* Certificate of Approval contents: organization name/location, issue/validity date, terms of approval.
* Approval valid for up to five years, renewable subject to DGCA terms and conditions.
* ATSTO shall display the ATSTO approval certificate in a place accessible to the public in the principal place of business of the training organization.
* The approval certificate and scope of training issued to an ATSTO shall be available on the premises for inspection by the public and the DGCA.
* **Training and Procedures Manual (TPM):**
* ATSTO must prepare a TPM with specified information, including scope of training, training programs, quality assurance system, facilities, personnel duties/qualifications, procedures for instructional personnel competence, and record-keeping methods.
* Amendments to the TPM must be approved on the eGCA portal.
* The Training and Procedures Manual' should include elements as enumerated in the ICAO Annex-1, Appendix-2, paragraph-2.
* **Training Programme:**
* ATSTO shall develop a training programme appropriate to the size and scope of the training
* ATSTO shall obtain approval for the programme prior to implementation
* **Quality Assurance (QA) System:**
* ATSTO must establish a QA system ensuring compliance with requirements, including a QA manual.
* Compliance checklist for reviewing of an ATSTO's Quality Assurance Manual is given in Appendix-IIIA
* **Facilities and Personnel:**
* Training facilities must be appropriate for the training scope.
* Accountable Manager, Head of Training/Chief Instructor, and Quality Assurance Manager must be appointed.
* **Students and Records:**
* Intake of students should match instructor numbers.
* Security clearance is needed for foreign trainees.
* Student/trainee records must be maintained for at least five years after completion.
* **DGCA Oversight:**
* DGCA will inspect ATSTOs before/after approval/renewal and may conduct unscheduled audits.
* All records pertaining to ATSTO shall be provided by accountable manager promptly during inspection/ audit.
* **Renewal and Penalties:**
* Application for renewal must be submitted 60 days before expiration with specified documents.
* DGCA may renew for up to five years if ATSTO maintains required capability; inspection may be required.
* False representation or failure to comply may result in alteration, suspension, or cancellation of approval.
* **Examination**
* DGCA may authorise ATSTO or the concerned ANSP under the relevant rules to conduct examinations to test the level of knowledge specified in Schedule III
**Impact Analysis**
**Stakeholder:** Air Traffic Services Training Organizations (ATSTO)
* **Impact:** Must comply with the detailed requirements outlined in the CAR for approval, operation, and renewal, necessitating resource allocation and procedural adjustments.
* **Action Required:** Review and implement required changes in training programs, facilities, manuals, and quality assurance systems, and apply for approval/renewal with appropriate documentation.
**Stakeholder:** Directorate General of Civil Aviation (DGCA)
* **Impact:** Responsible for overseeing and ensuring compliance of ATSTOs with the requirements.
* **Action Required:** Conduct inspections and audits of ATSTOs, review applications for approval/renewal, and enforce regulations as necessary.
**Stakeholder:** Air Navigation Service Providers (ANSP)
* **Impact:** ANSPs providing air traffic services shall apply for grant of approval of ATSTO.
* **Action Required:** Apply for grant of approval of ATSTO.
**Stakeholder:** Air Traffic Controller Trainees
* **Impact:** Training must meet the new standards.
* **Action Required:** Participate in any new or updated training activities.
Key Entities Referenced
Aircraft Rules 1937: A set of rules referenced as requiring air traffic controller licenses and prescribing regulations for approval of training organizations.
Civil Aviation Requirements (CAR): The primary subject of the document which issues requirements for approval, renewal and oversight of training organization for personnel of Air Traffic Services.
Air Traffic Services Training Organization (ATSTO): The subject organization to which the CAR applies, defined as a training organization for conducting approved training courses for students to obtain air traffic controller licenses.
Directorate General of Civil Aviation (DGCA): The regulator responsible for granting approval to ATSTOs, conducting inspections, and overseeing compliance with the CAR.
CIVIL AVIATION REQUIREMENTS SECTION 9
SERIES L PART IX 17th DECEMBER 2018
GOVERNMENT OF INDIA
OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION
TECHNICAL CENTRE, OPP SAFDARJANG AIRPORT, NEW DELHI
CIVIL AVIATION REQUIREMENTS
SECTION 9 – Airspace and Air
navigation Services Standards AIR
TRAFFIC CONTROLLERS LICENSING DIRECTORATE
SERIES L PART IX EFFECTIVE: FORTHWITH
ISSUE I, DATED 17th DECEMBER 2018 FILE No.: DGCA-21048/13/2018-ANS
21035(11)/27/2025-ATCO
Subject: Approval, Renewal and Oversight of Training Organization for personnel of Air
Traffic Services.
1. Introduction
Rule 93 of Aircraft Rules 1937 requires that no person shall engage himself in the provision of air traffic
services in the Indian airspace or in any airspace outside the Indian territory for which India has, in
pursuance of any international arrangement, undertaken to provide air traffic services, unless he holds a
valid air traffic controller license issued under these rules. Rule 114, of the Aircraft Rules 1937, prescribe
the regulations relating to approval of training organization in respect of Personnel of Air Traffic Services.
This CAR is issued under provisions of Rule 114 and Rule 133A of the Aircraft Rules 1937. The CAR
contains the requirements related to approval, renewal and oversight of Training Organization.
Definitions:
Adapted competency model: A group of competencies with their associated description and
performance criteria adapted from an ICAO competency framework that an organization uses to develop
competency-based training and assessment for a given role.
Approved training: Approved training means a training the curriculum of which has been approved by
the Director General.
Approved training organization: Approved training organization means an organization approved by
the Director General and operating in accordance with the provisions of these rules to perform approved
training.
Competency: A dimension of human performance that is used to reliably predict successful performance
on the job. A competency is manifested and observed through behaviours that mobilize the relevant
knowledge, skills and attitudes to carry out activities or tasks under specified conditions.
Rev 2 3 dated ---------
1CIVIL AVIATION REQUIREMENTS SECTION 9
SERIES L PART IX 17th DECEMBER 2018
Competency-based training and assessment: Training and assessment that are characterized by a
performance orientation, emphasis on standards of performance and their measurement, and the
development of training to the specified performance standards.
Competency standard: A level of performance that is defined as acceptable when assessing whether or
not competency has been achieved.
ICAO competency framework: A competency framework, developed by ICAO, is a selected group of
competencies for a given aviation discipline. Each competency has an associated description and
observable behaviours.
Monitoring: A cognitive process to compare an actual to an expected state.
Note– Monitoring is embedded in the competencies for a given role within an aviation discipline, which
serve as countermeasures in the threat and error management model. It requires knowledge, skills and
attitudes to create a mental model and to take appropriate action when deviations are recognized.
Observable behaviour (OB): A single role-related behaviour that can be observed and may or may not
be measurable.
Performance criteria: Statements used to assess whether the required levels of performance have been
achieved for a competency. A performance criterion consists of an observable behaviour, condition(s) and
a competency standard.
2. Applicability and Scope
2.1 Provisions of this CAR are applicable to all training organizations for conducting an approved training
course for students to enable them to attain the level of competency required for obtaining a licence or
rating specified in Rule 95. All such organizations will be named as Air Traffic Services Training
Organization (ATSTO).
2.2 Air Navigation Service Provider providing air traffic services shall apply for grant of approval of ATSTO.
3. Approval of ATSTO
3.1 Application for Approval.
Applicant shall make an application in prescribed proforma, provided in Appendix I to this CAR, to DGCA
through eGCA (e-Governance of Civil Aviation) along with prescribed fee as mentioned in sub rule (10)
of Rule 114 of Aircraft Rules 1937, through https://bharatkosh.gov.in (and the payment is to be made to
Bharatkosh, which is mapped in eGCA),along with the following:
3.1.1 A statement showing that the minimum qualification requirements for each management position are
met or exceeded;
3.1.2 The proposed training authorizations requested by the applicant;
3.1.3 The proposed location of each training facility and any satellite facility location, the proposed courses
Rev 2 3 dated ---------
2CIVIL AVIATION REQUIREMENTS SECTION 9
SERIES L PART IX 17th DECEMBER 2018
to be taught at each location, and the infrastructure at each location.
3.1.4 Two copies of its pProposed Training and Procedures Manual (TPM) along with Quality Assurance
(QA) Manual (if QA Manual not integral part of TPM), and Examination Procedure Manual( EPM), if EPM
not integral part of TPM.
3.1.5 Two copies of each pProposed training course curriculum, including syllabi, outlines, training
programme, procedures, and documentation to support the curriculum for which approval is sought.
3.1.6 A statement of the maximum number of students/ trainees it expects to teach at any one time;
3.1.7 Copy of contract arrangement for outsourced facility or equipment.
3.1.8 A statement of compliance to all applicable CARs for the proposed training, including pertinent
subparts and each relevant section of the regulation, which should be identified and accompanied by a
brief description.
3.1.9 Any additional information the DGCA requires the applicant to submit.
3.2 All requirements shall be supported by supplementary documents.
3.3 Process of Approval of ATSTO
3.3.1 After scrutiny of submitted application completed in all respect, the ATSTO shall be informed of the
inspection/ audit, which will be conducted by a DGCA team along with ATSTO’s post holders.
3.3.2 The inspection/ audit team shall follow the five phase approval process and cover the entire areas
using standard checklists as specified in this CAR. DGCA team shall assess; the ATSTO’s compliance
with qualification and competence requirements in respect of instructors, adequacy of facilities, training
system, syllabi and documents including Quality Assurance System.
3.3.3 Upon satisfactory compliance of all requirements, DGCA may grant an approval. No provisional or
part approval will be granted except in cases of exceptional circumstances at the discretion of the Director
General under the conditions specified therein.
3.4 Certificate of Approval
3.4.1 The Certificate of Approval will contain the following elements:
3.4.1.1 Organization’s name and location;
3.4.1.2 Date of issue and period of validity; and
3.4.1.3 Terms of Approval.
3.4.2 The approval certificate of a training organisation shall, unless suspended or cancelled, remain valid
for a period not exceeding five years, which may be renewed for a period not exceeding five years at a
time subject to the terms and conditions specified by the Director General.
Rev 2 3 dated ---------
3CIVIL AVIATION REQUIREMENTS SECTION 9
SERIES L PART IX 17th DECEMBER 2018
3.4.3 The ATSTO shall display the ATSTO approval certificate in a place accessible to the public in the
principal place of business of the training organization.
3.4.4 The approval certificate and scope of training issued to an ATSTO shall be available on the premises
for inspection by the public and the DGCA.
4 Training and Procedures Manual
4.1 ATSTO shall prepare and submit a Training and Procedure Manual for the use and guidance of their
personnel concerned. This manual may be issued in separate parts and shall contain at least the following
information:
4.1.1 a general description of the scope of training authorized under the organization’s terms of approval;
4.1.2 The content of the training programmes offered including the courseware and equipment to be used;
4.1.3 a description of the organization’s quality assurance system
4.1.4 a description of the organization’s facilities;
4.1.5 The name, duties and qualification of the person designated as responsible for compliance with the
requirements of the approval;
4.1.6 a description of the duties and qualification of the personnel designated as responsible for planning,
performing and supervising the training;
4.1.7 a description of the procedures used to establish and maintain the competence of instructional
personnel;
4.1.8 a description, when applicable, of additional training needed to comply with an operator’s procedures
and requirements; and
4.1.9 a description of the method used for the completion and retention of the training records required;
4.1.10 a description of the selection, role and duties of the personnel within the ATSTO, authorised by
DGCA to conduct the tests/ assessment required in the training in accordance with para 14 of this CAR.
4.2 The training and procedures manual shall be amended as necessary to keep the information contained
therein up to date. The ATSTO shall promptly furnish amendments to the training and procedures manual
for approval on eGCA portal.
5 Training Programme
5.1 The ATSTO shall develop a training programme appropriate to the size and scope of the training,
covering all aspects of the course and obtain approval for the programme prior to implementation. The
programme shall include a breakdown of theory and simulator training in a week-by-week or phase
presentation, a list of standard exercises, and a syllabus summary.
5.2 The ATSTO shall conduct the training in accordance with the approved training programme. The
Rev 2 3 dated ---------
4CIVIL AVIATION REQUIREMENTS SECTION 9
SERIES L PART IX 17th DECEMBER 2018
ATSTO shall obtain the approval for any changes to the approved training programme prior to
implementing the changes.
6 Quality Assurance System
6.1 The ATSTO shall establish a Quality Assurance (QA) system, which ensures that training and
instructional practices comply with all relevant requirements.
6.2 The objective of Quality Assurance (QA) is to ensure the achievement of results that conform to the
standards set out in the ATSTO’s manuals and in those requirements and documents issued by the
Director General. The effective application of QA principles will aid the ATSTO in meeting all regulatory
requirements.
6.3 Appendix III describes proactive processes and provides guidance on how to institutionalize a quality
system that incorporates QA and assists ATSTO in reaching their full potential.
7 Facilities
7.1 Training organization shall establish facility appropriate to the size and scope of the training and it shall
provide physical environment conducive to the learning.
These shall include:
7.1.1 General:
7.1.1.1 Sufficient Office Space and facilities for instructional and administrative staff.
7.1.1.2 Storage area including secure area for training, examination and personnel records.
7.1.2 Classrooms, Library and training aids:
7.1.2.1Sufficient and well equipped class rooms. The classrooms shall be properly lighted and furnished.
The size of the rooms shall be appropriate to accommodate the batch of students/ trainees.
7.1.2.2Library with adequate number of text books/ e-books on various aviation related subjects,
regulations, ICAO Annexes, DGCA circulars, CARs, AICs, Aircraft Manual; AIP and its supplement and
route maps for training.
7.1.2.3Training aids like simulator, computer, projector/suitable monitor, multimedia etc. including its
maintenance arrangements.
7.1.3 Practical training areas:
7.1.3.1 Sufficient and well equipped lab for Simulation and briefing purposes.
7.2 An approved ATSTO shall not make a substantial change in the facilities, equipment or material that
have been approved for a particular training programme, unless that change is approved in advance by
the DGCA.
8 Personnel
Rev 2 3 dated ---------
5CIVIL AVIATION REQUIREMENTS SECTION 9
SERIES L PART IX 17th DECEMBER 2018
8.1 Management Personnel
8.1.1 Accountable Manager: The organization shall appoint an accountable manager who has corporate
authority for ensuring that training can be financed and carried out up to the standards required by Aircraft
Rules and relevant regulations and this CAR. The accountable manager shall ensure that all necessary
resources are available to accomplish training in accordance with laid down standards and establish and
promote the quality standards for the training.
8.1.2 Post Holders: The Accountable Manager shall nominate a person or group of personnel for
acceptance as post holder(s) for key positions.
Depending upon the size and scope of the organization, a post holder may perform a combination of key
roles and the same shall be described in the training and procedures manual. The nominated key positions
are:-
a) Head of the training/Chief Instructor (CI)*
b) Quality Assurance Manager
Note: Accountable Manager may identify the need of key positions at Satellite station and nominate
person/s depending upon its size and scope. ]
8.1.3 Duties and responsibilities of the post holders shall be clearly defined in the Training and Procedures
Manual. The ATSTO shall ensure that the key personnel meet the eligibility requirements set forth in the
manual.
8.2 Head of the training/Chief Instructor (CI)
ATSTO shall appoint a Head of the training/Chief Instructor (CI) depending on the size of organization.
8.3 Instructors
ATSTO shall employ/ engage sufficient number of qualified and competent Instructors for procedural
control training and surveillance control training to ensure proper training in accordance with the scope of
approval.
8.4 Instructors and their qualifications
ATSTO shall ensure that all instructional personnel receive initial and continuation training appropriate to
their assigned tasks and responsibilities.
To teach specific subjects, theory class instructor shall have acquired the sufficient experience to cover
the subjects specified in the Schedule -III of the Aircraft Rules 1937.
8.5 Student/Trainee of ATSTO
8.5.1 The intake of students/trainee in the ATSTO shall be commensurate with the number of instructors.
8.5.2 ATSTO shall have a system of induction of students/trainees and a process of their training in
compliance with the provisions of relevant regulations.
Rev 2 3 dated ---------
6CIVIL AVIATION REQUIREMENTS SECTION 9
SERIES L PART IX 17th DECEMBER 2018
8.5.3 Security clearance in respect of foreign trainees, if applicable, shall be obtained from the concerned
authorities prior to commencement of their training.
9. Completion Certificate
9.1 An ATSTO shall issue a completion certificate to each student/trainees who successfully completes its
approved course of training.
9.2 The completion certificate must be issued to the students/ trainees upon successfully completion of
the course of training and contain at least the following information:
a) The name and certificate number of the ATSTO;
b) The name of the trainee to whom it was issued;
c) The course of training for which it was issued;
d) The date of completion;
e) Certification of the information contained on the completion certificate by the chief instructor for that
course of training.
10. Records
10.1 ATSTO shall retain detailed student/trainee records to show that all requirements of the training
course have been met and records shall be kept for a minimum period of five years after completion of the
training.
10.2 ATSTO shall maintain a system for recording the qualifications and training of instructional and
examining staff, where appropriate. The records shall be retained for a minimum period of five years after
the instructor or examiner ceases to perform a function for the training organization.
10.3 ATSTO shall maintain records of functions performed by instructor/ examiner for a minimum period
of five years.
11. DGCA Oversight
11.1 DGCA will inspect the ATSTO in compliance with Aircraft Rules 1937, applicable Civil Aviation
Requirements before and after approval/ renewal of approval. DGCA may carry out inspection/ audit of
any ATSTO as per schedule or whenever required.
11.2 All the records pertaining to ATSTO shall be provided by accountable manager promptly during
inspection/ audit for continuous oversight of the the ATSTO.
12. Renewal of the approval
12.1 An approved ATSTO must submit an application for renewal of the approval as provided in Appendix-
Rev 2 3 dated ---------
7CIVIL AVIATION REQUIREMENTS SECTION 9
SERIES L PART IX 17th DECEMBER 2018
I along with the following documents at least 60 days before the expiration of approval:
12.1.1 The following documents shall be submitted along with the application for renewal:
(a) Prescribed fee under Rule 114 through https://bharatkosh.gov.in and the payment is to be made to
Bharatkosh, which is mapped in eGCA
(b) Copy of latest internal audit report.
(c) Compliance of all pending observations in respect of last inspection.
12.2 DGCA may renew the approval for a period not exceeding five years on being satisfied that the
ATSTO continues to maintain the required capability. An inspection of the ATSTO may be required prior
to renewal.
13. Enforcement/ Penal Provision
In case of concealment or misrepresentation of facts to DGCA or during the training activities, if the
organization fails to comply with the requirements of Aircraft Act 1934, Aircraft Rules 1937, applicable
CARs or other regulations issued from time to time; or if the standard of training is found to be below the
desired level, the approval granted to the organization shall be liable to alteration, suspension or
cancellation.
14. Examination
14.1 DGCA may authorise ATSTO or the concerned ANSP under the relevant rules to conduct
examinations to test the level of knowledge specified in Schedule III, fix examination centres within India,
appoint examiners and evaluators and specify the procedure for conducting the examinations for Air Traffic
Service Personnel Licensing.
14.2 Examination related with the personnel licensing of Air Traffic Services, if delegated to ATSTO/Air
Navigation Service Provider, will be subject to proper Surveillance/oversight by DGCA.
Rev 2 3 dated ---------
8CIVIL AVIATION REQUIREMENTS SECTION 9
SERIES L PART IX 17th DECEMBER 2018
Appendix-I
Application Form
भारत सरकार
नागर विमानन महावनदेशालय
GOVERNMENT OF INDIA DIRECTORORATE
GENERAL OF CIVIL AVIATION
APPLICATION FOR APPROVAL/RENEWAL/EXTENSION IN SCOPE OF
ATS TRAINING ORGANISATION
(Please tick √ as appropriate)
□ Initial Issue □ Renewal □ Extension in Scope □ Change in the scope of
approval
1. PARTICULARS OF TRAINING ORGANISATION
Rev 2 3 dated ---------
9CIVIL AVIATION REQUIREMENTS SECTION 9
SERIES L PART IX 17th DECEMBER 2018
1.1 Name of Organisation :
Address of Organisation :
Telephone :
Fax :
Email :
1.2 Principal base of ATSTO :
1.3 Other bases of ATSTO, if any :
2. PARTICULARS OF KEY PERSONNEL
2.1 Name of the Accountable Manager :
Designation :
Telephone :
Fax :
Email:
2.2 Name of the Head of ATS Training :
Designation :
Telephone :
Fax :
Email:
3. PARTICULARS OF ATS TRAINING COURSES TO BE APPROVED
(if insufficient space, please attach a separate list)
3.1
3.2
3.3
3.4
3.5
4. ENCLOSED DOCUMENTS
4.1 Training and Procedure Manual (TPM) along with duly filled in compliance check list as per
appendix IIA.
4.2 Quality Assurance Manual along with duly filled in compliance checklist as per appendix
IIIA.
4. DETAILS OF FEE
Rev 2 3 dated ---------
10CIVIL AVIATION REQUIREMENTS SECTION 9
SERIES L PART IX 17th DECEMBER 2018
Amount of fee :
(Attach proof of fee deposited)
5. OTHER INFORMATION
6. DECLARATION
I hereby declare that the above particulars, compliance checklists provided in Appendices
and all documents submitted are true to the best of my knowledge.
Date: (Accountable Manager)
Location: Signature with Stamp
Rev 2 3 dated ---------
11CIVIL AVIATION REQUIREMENTS SECTION 9
SERIES L PART IX 17th DECEMBER 2018
Appendix-II
ATSTO’s Training and Procedures Manual
1. Introduction
The Training and Procedures Manual describes the way the organisation conducts its
activities. As such it is a document which is essential for the organisation as it provides the
management with clear guidance on the policy of the organisation as well as the procedures
and processes which are used to provide training. It is also an essential document for
DGCA. During the approval process, it allows the DGCA to assess whether the way the
organisation is planning to operate is in line with the existing requirements and accepted
practices. Once the training organisation starts functioning, a large part of the surveillance
activities of the DGCA will be to ensure that the organisation is functioning as per
procedures laid down in the Training and Procedures Manual.
2. General Consideration
In preparing the Training and Procedures Manual, it is important for the ATSTO to ensure
that the Training and Procedures Manual is consistent with regulations, other documents
issued by the training organisation and in line with and human factors principles. It is also
necessary to ensure consistency across all departments within the organisation as well as
consistency in use. An integrated approach, recognizing operational documents as a
complete system, is the key to success. The manual should be assessed on same lines
by DGCA.
3. Contents
The content of the training and procedures manual spelled out in this Appendix, provides
a detailed list which expands on the structure expected for the manual. Depending on the
size and scope of training provided by the organisation, some of the elements contained in
this Appendix can be combined and subdivided further as determined by ATSTO and
acceptable to DGCA.
4. Organizing the Manual -
4.1 A Training and Procedures Manual should be organised as far as practicable in
the order as enumerated in the Appendix-II A.
4.2 The manual should be consistent with the training organisation’s philosophy,
policies, procedures and practices.
5. Design
5.1 The structure of the manual should be easy to understand, appropriate for the
information documented and clearly identified through headings and other
formatting devices.
Rev 2 dated ---------
11CIVIL AVIATION REQUIREMENTS SECTION 9
SERIES L PART IX 17th DECEMBER 2018
5.2 Precise language should be used wherever possible. Significant terms for
common items and actions should be maintained throughout the manual. Terms
must be clear and easily understood.
5.3 Writing style, terminology, formatting, and use of graphics and symbols should
be consistent throughout the document.
5.4 The manual should include a glossary of terms, acronyms, abbreviations and
associated definitions. The glossary should be updated on a regular basis to
ensure access to the most recent terminology.
5.5 The revision process should be considered when designing the manual for ease
of amendment and distribution.
5.6 The training and procedures manual should comply with the requirements of
the training organisation’s quality assurance system.
6. Validation
6.1 The Training and Procedures Manual should be reviewed and tested under
realistic conditions before its use. The validation process should include using the
critical aspects of the information contained in the manual to verify its
effectiveness. Routine interaction among groups within the organisation should
be included in the validation process.
6.2 A final review of the manual should ensure that all required topics have been
addressed with an appropriate level of details for users. The final review should
also confirm compliance with safety regulations, manufacturers’
recommendations and the organisation’s philosophy, policies, procedures and
practices.
7. Deployment
The training organisation should have a system in place to monitor use of the Training
and Procedures Manual after it is published. This will ensure appropriate and realistic
use of the manual, based on the operational environment, in a way that is operationally
relevant and beneficial to the personnel for whom it is intended. The monitoring system
should include formal feedback to obtain inputs from the principal users of the manual
and other persons who would be affected by a new or revised policy, procedure or
practice.
8. Amendment
8.1 The training organisation should develop an effective information gathering,
review, distribution and revision control system to process information obtained
from all sources relevant to the organisation.
Rev 2 dated ---------
12CIVIL AVIATION REQUIREMENTS SECTION 9
SERIES L PART IX 17th DECEMBER 2018
8.2 The training organisation should develop an information review, distribution and
revision control system to process information resulting from changes that
originate within the organisation. This includes changes:
8.2.1 In the organisation’s policies, procedures and practices;
8.2.2 In response to operating experience;
8.2.3 To the scope of training provided;
8.2.4 To the content of training programs;
8.2.5 Resulting from the installation of new equipment;
8.2.6 To an approval document or operating certificate; and
8.2.7 For the purpose of maintaining standardisation.
8.3 The training and procedures manual should be reviewed in association with
other operational documents :
8.3.1 On a regular basis (at least once a year);
8.3.2 After major events such as mergers, acquisitions, rapid growth,
downsizing, etc.;
8.3.3 After technology changes, e.g.: the introduction of new equipment; and
8.3.4 After changes in concerned regulations.
8.4 Permanent changes to the training and procedures manual shall be
communicated through a formal amendment process. The manual should be
amended or revised as necessary to ensure that the information contained is
kept up to date.
8.5 Distribution of amendments and revisions should include a tracking system. The
tracking system should include some form of log combined with a procedure to
ensure that all amendments are furnished promptly to all organisations or
persons to whom the manual has been issued.
8.6 The compliance checklist for reviewing of an ATSTO‘s Training and
Procedures Manual is given in Appendix- IIA.
9. Contents of the Training and Procedures Manual
9.1 The ‘Training and Procedures Manual’ should include elements as enumerated
in the ICAO Annex-1, Appendix-2, paragraph-2.
9.2 Quality assurance system- Provide a brief description of the quality assurance
system, as required by ICAO Annex 1, Appendix 2, paragraph 4, with reference
to a separate quality assurance manual or, include the full quality assurance
system in the Training and Procedures Manual. Contents of the Quality
Assurance Manual are given in Appendix III and checklist to ensure
compliance of the contents is given in Appendix IIIA.
Rev 2 dated ---------
13CIVIL AVIATION REQUIREMENTS SECTION 9
SERIES L PART IX 17th DECEMBER 2018
Appendix-II A
Training and Procedures Manual Compliance Checklist
Application form for Approval/Renewal/Extension in scope of ATS Training Organisation shall
accompanied this compliance checklist. This Checklist shall be used as ATSTO’s compliance
statement and DGCA inspector checklist for acceptance of Training and Procedures Manual of
ATSTO. The ATSTO shall fill up checklist after ensuring each item.
Name of ATSTO:
Date:
Address of ATSTO:
Website & e-mail of ATSTO:
Name of Accountable manager:
Name of Head of Training:
Contact Numbers:
(A = Acceptable, U = Unacceptable) TPM =Training & Procedure Manual
No. Subject To be filled by ATSTO To be filled by DGCA
1. GENERAL TPM ref. A U Remarks
1.1 Preamble relating to use and authority of the
Training and Procedures Manual.
1.2 Table of contents.
1.3 Amendment, revision and distribution.
a) Procedures for amendment;
b) Record of amendment page;
c) Distribution list; and
1.4 Glossary of significant terms and definitions,
including a list of acronyms and/or abbreviations
2. TRAINING ORGANISATION
2.1 Description of the scope of training courses
authorized/ to be authorized under the
organisation's terms of approval.
2.2 Organisational structure of the training
organisation, including the names of the post
holders.
2.3 Qualifications, responsibilities and reporting
hierarchy of management and key operational
personnel, including but not limited to:
a) Accountable manager
b) Head of training/Chief Instructor
Rev 2 dated ---------
14CIVIL AVIATION REQUIREMENTS SECTION 9
SERIES L PART IX 17th DECEMBER 2018
c) Chief Instructor
d) Quality Manager
e) Safety Manager (If available)
f) Instructors
g) Examiners
2.4 Policies of training organisation, including the
ones dealing with :
a) The training organisations objectives.
b) The selection of operational personnel
(Instructor, Examiners etc.) and the
maintenance of their qualifications.
c) The training programme design and
development, including the need for
programme.
d) The evaluation, selection and maintenance of
training material and devices.
e) The maintenance of the training facilities and
equipments.
3. FACILITIES
3.1 Office space for operational and admin staff
3.2 Classrooms and Labs-
a) Class rooms to conduct the theory classes
b) Labs equipped with training devices and
material to conduct the practical classes.
c) Training aids such as computer, projector/
suitable monitor, multimedia aids, etc
d) Language lab as per the operational and training
requirements
3.3 Library-
Sufficient copies of subject wise updated study
material, DGCA circulars, CARs, AICs, AIP,
ICAO Annexes and Docs etc.
Simulators (if insufficient space, please attach a
3.4
separate list)
a) Type of simulator
b) Purpose of Simulator
c) Number of Simulators
d) Age since manufacturing
e) General condition of simulators
4. TRAINING
4.1 A statement of what the student is expected to be
able to do on successful completion of training,
Rev 2 dated ---------
15CIVIL AVIATION REQUIREMENTS SECTION 9
SERIES L PART IX 17th DECEMBER 2018
4.2 Pre-entry requirements -
a) Minimum age
b) Educational requirements
4.3 Training curricula of each course, including -
a) Knowledge (Theoretical training)
b) Skill (Practical training)
c) Assessment and examination methods
4.4 Content of the training programme(s) offered
including the courseware and equipment used -
a)
b)
c)
d)
e)
f)
g)
h)
4.5 Training records -
a) Procedure for maintaining integrity of record
and documents i.e. protection from alteration
and removal etc.
b) Attendance records.
c) Persons responsible for checking records and
students’ log books and procedure thereof.
d) The nature and frequency of records checks.
e) Standardization of entries in training records.
f) Students log books
4.6 Checks and tests –
a) Knowledge progress tests and knowledge
tests.
b) Test reports and records.
c) Procedures for test paper preparation, type of
question and assessment, standard required
for passing the test.
d) Test/retest procedures.
4.7 Course structure- training phase
The curriculum hours for each phase and
number of exercises within each phase shall be
stated and when progress tests are to be
conducted, etc.
Rev 2 dated ---------
16CIVIL AVIATION REQUIREMENTS SECTION 9
SERIES L PART IX 17th DECEMBER 2018
4.8 Course structure integration of curricula
The manner in which theoretical knowledge, and
simulation training will be integrated so that as the
theoretical training and simulation training
exercises are carried out, students will be able to
apply the knowledge gained from the associated
theoretical knowledge.
4.9 Student progress
a) The requirement for student progress and
include a brief but specific statement of what a
student is expected to be able to do and the
standard of proficiency he or she must achieve
before progressing from one phase to another
phase.
b) Include minimum experience
requirements in terms of hours of practical
training/number of exercises, satisfactory exercise
completion, etc as necessary before commencing
next phase.
4.10 Instructional methods -
The ATSTO requirements, particularly in respect
of pre and post exercise briefing, adherence to
curricula and training specifications.
4.11 Standardised check-lists for basic and emergency
procedures?
5. STAFF TRAINING
5.1 Appointments of persons responsible for
standards/ competence of instructional staff.
5.2 Initial training of Instructors
5.3 Refresher Recurrent training of instructors
The information as mentioned on the page and para column has been verified
from the Training and Procedure Manual of ATSTO.
(Accountable Manager) (Head of Training/Chief
Instructor) Signature with Date: Signature with
Date:
Rev 2 dated ---------
17CIVIL AVIATION REQUIREMENTS SECTION 9
SERIES L PART IX 17th DECEMBER 2018
For office use only:
Review by DGCA:-
Remarks:
Actions required:
Name of DGCA Team members conducted the review:
Date:
Rev 2 dated ---------
18CIVIL AVIATION REQUIREMENTS SECTION 9
SERIES L PART IX 17th DECEMBER 2018
Appendix-III
ATSTO’s Quality Assurance System
1. Terminology
1.1 Quality - The totality of features and characteristics of a product or service that
bear on its ability to satisfy stated or implied needs.
1.2 Quality of Training - The outcome of the training that meets stated or implied
needs within the framework of set standards.
1.3 Quality Assurance - All those planned and systematic actions necessary to
provide adequate confidence that all training activities satisfy given standards
and requirements, including the ones specified by the ATSTO in relevant
manuals.
1.4 Quality Manual- The document containing the relevant information pertaining
to the ATSTO’s Quality Assurance System.
1.5 Quality Audit - A systematic and independent examination to determine
whether quality activities and related results comply with planned
arrangements and whether these arrangements are implemented effectively
and are suitable to achieve objectives.
2. Objective of a Quality Assurance System
2.1 The objective of a Quality Assurance System is to ensure the achievement of
results that conforms to the standards set out in the ATSTO’s Training and
Procedure Manual for continuous improvement of the quality of training
provided.
2.2 The basis for quality is to establish standards, to plan activities and procedures
to support such standards, to train the personnel involved before implementing
the documented procedures, and to measure the outcomes of the activities to
ensure that they meet standards and expected results. If any non-conformities
are found, corrective actions are taken to improve processes and procedures.
3. Elements of a Quality Assurance System
3.1 In a quality assurance system of an ATSTO, the following elements should be
clearly identifiable:
3.1.1 Organisation’s training policy
3.1.2 Training standards
3.1.3 Allocation of responsibility
3.1.4 Resources, organisation and operational processes
3.1.5 System to ensure conformance of training with the policy and
standards
Rev 2 dated ---------
19CIVIL AVIATION REQUIREMENTS SECTION 9
SERIES L PART IX 17th DECEMBER 2018
3.1.6 System for identifying deviations from policy and standards and
taking corrective action and
3.1.7 Evaluation and analysis of experiences and trends concerning policy,
training and flight safety standards, in order to provide feedback into
the system for the continual improvement of the quality of training.
4. Contents of ATSTO’s Quality Assurance System
4.1 Quality policy and strategy
4.1.1 The ATSTO shall describe how the organisation formulates, deploys,
and reviews its policy and strategy and turns it into plans and actions
applicable to all levels of the organisation. A formal written quality
policy statement should be established that is a commitment by the
head of the training organisation, as to what the quality assurance
system is intended to achieve. The quality policy should reflect the
achievement and continued compliance with the rules and
regulations, together with any additional standards specified by the
ATSTO.
4.1.2 The accountable manager of the training organisation will have
overall responsibility for the quality assurance system including the
frequency, format and structure of the internal management review
and analysis activities and may delegate the responsibility for the
tasks, defined under paragraph 4.2 below, to a quality manager.
4.2 Quality manager
4.2.1 The primary role of the quality manager is to verify, by monitoring
activities in the field of training, that the standards as established by
the ATSTO and any additional requirements of the DGCA are being
carried out properly.
4.2.2 The quality manager should be responsible for ensuring that the
quality assurance system is properly implemented, maintained and
continuously reviewed and improved.
4.2.3 The quality manager should:
4.2.3.1 Have direct access to the accountable manager; and
4.2.3.2 Have access to all parts of the ATSTO's organisation.
4.2.4 The quality manager should be responsible for ensuring that training
relating to the quality assurance system is being conducted.
Rev 2 dated ---------
20CIVIL AVIATION REQUIREMENTS SECTION 9
SERIES L PART IX 17th DECEMBER 2018
4.3 Quality assurance system
4.3.1 The quality assurance system of ATSTO should ensure compliance
with requirements, conformance to standards and adequacy of
training activities conducted.
4.3.2 Every process that assists the ATSTO to achieve its results should
be identified and activities and procedures documented.
4.3.3 The ATSTO should specify the basic structure of the quality
assurance system applicable to all training activities conducted.
4.4 Feedback System
The quality assurance system should include a feedback system to ensure that
corrective actions are identified and promptly addressed. The feedback system should
also specify who is required to rectify discrepancies and non-conformance in each
particular case, and the procedure to be followed if corrective action is not completed
within an appropriate timescale.
4.5 Documentation
4.5.1 Relevant documentation includes the relevant part(s) of the Training
and Procedures Manual, which may be included in a separate quality
manual.
4.5.2 In addition, relevant documentation should also include the following:
4.5.2.1 Quality policy;
4.5.2.2 Terminology;
4.5.2.3 Specified training standards;
4.5.2.4 A description of the organisation;
4.5.2.5 The allocation of duties and responsibilities; and
4.5.2.6 Training procedures to ensure regulatory compliance.
4.5.3 The quality assurance audit programme, reflecting:
4.5.3.1 Schedule of the monitoring process;
4.5.3.2 Audit procedures;
4.5.3.3 Reporting procedures;
4.5.3.4 Follow-up and corrective action procedures;
Rev 2 dated ---------
21CIVIL AVIATION REQUIREMENTS SECTION 9
SERIES L PART IX 17th DECEMBER 2018
4.5.3.5 Recording system; and
4.5.3.6 Document control.
4.6 Quality assurance audit programme
The quality assurance audit programme should include all planned and systematic
actions necessary to provide confidence that all training are conducted in accordance
with all applicable requirements, standards and procedures.
4.6.1 Quality inspection
The primary purpose of a quality inspection is to observe a particular event/
action/ document etc., in order to verify whether established training
procedures and requirements are followed during the accomplishment of
that event and whether the required standard is achieved.
4.6.2 Audit
4.6.2.1 An audit is a systematic and independent comparison of the
way in which a training is being conducted against the way in
which the published training procedures say it should be
conducted.
4.6.2.2 Audits should include at least the following quality procedures
and processes:
4.6.2.2.1 An explanation of the scope of the audit;
4.6.2.2.2 Planning and preparation;
4.6.2.2.3 Gathering and recording evidence; and
4.6.2.2.4 Analysis of the evidence.
4.6.2.3 The various techniques that make up an effective audit are:
4.6.2.3.1 Interviews or discussions with personnel;
4.6.2.3.2 Review of published documents;
4.6.2.3.3 The examination of an adequate sample of records;
4.6.2.3.4 The witnessing of the activities which make up
the training; and
4.6.2.3.5 The preservation of documents and the
recording of observations.
Rev 2 dated ---------
22CIVIL AVIATION REQUIREMENTS SECTION 9
SERIES L PART IX 17th DECEMBER 2018
4.6.3 Auditors
4.6.3.1 ATSTO should decide, depending on the complexity of the
training, whether to make use of a dedicated audit team or a
single auditor. In any event, the auditor or audit team should
have relevant training and/or operational experience.
4.6.3.2 The responsibilities of the auditors should be clearly defined in
the relevant documentation.
4.6.4 Auditor's independence
4.6.4.1 Auditors should not have any day-to-day involvement in the
area of the operation or maintenance activity that is to be
audited. An ATSTO may, in addition to using the services of
full-time dedicated personnel belonging to a separate quality
department, undertake the monitoring of specific areas or
activities by the use of part-time auditors.
4.6.4.2 ATSTO whose structure and size does not justify the
establishment of full-time auditors, may undertake the audit
function by the use of part-time personnel from within its own
organisation or from an external source under the terms of an
agreement acceptable to the DGCA.
4.6.4.3 In all cases the ATSTO should develop suitable procedures to
ensure that persons directly responsible for the activities to be
audited are not selected as part of the auditing team. Where
external auditors are used, it is essential that any external
specialist is familiar with the type of training conducted by the
ATSTO.
4.6.4.4 The quality assurance audit programme of the ATSTO should
identify the persons within the company who have the
experience, responsibility and authority to:
4.6.4.4.1 Perform quality inspections and audits as part of
ongoing quality assurance;
4.6.4.4.2 Identify and record any concerns or findings, and the
evidence necessary to substantiate such concerns
or findings;
Rev 2 dated ---------
23CIVIL AVIATION REQUIREMENTS SECTION 9
SERIES L PART IX 17th DECEMBER 2018
4.6.4.4.3 Initiate or recommend solutions to concerns or
findings through designated reporting channels;
4.6.4.4.4 Verify the implementation of solutions within
specific time scales; and
4.6.4.4.5 Report directly to the quality manager.
4.6.5 Audit scheduling
4.6.5.1 A quality assurance audit programme should include a defined
audit schedule and a periodic review cycle. The schedule
should be flexible, and allow unscheduled audits when trends
are identified. Follow-up audits should be scheduled when
necessary to verify that corrective action was carried out and
that it was effective.
4.6.5.2 ATSTO should establish a schedule of audits to be completed
during a specific calendar period. All aspects of the training
should be reviewed within a period of twelve months in
accordance with the programme.
4.6.5.3 When ATSTO defines the audit schedule, significant changes
to the management, organisation, training, or technologies
should be considered, as well as changes to the standards and
requirements.
5. Monitoring and corrective action
5.1 The aim of monitoring within the quality system is primarily to investigate and
judge its effectiveness and thereby to ensure that defined policy and training
standards are continuously complied with. Monitoring activity is based upon
quality inspection, audit, corrective action and follow-up. The ATSTO should
establish and publish a quality procedure to monitor compliance with
requirements and conformance to standards on a continuing basis. This
monitoring activity should be aimed at eliminating the causes of unsatisfactory
performance.
5.2 Any non-conformance identified should be communicated to the manager
responsible for taking corrective action or, if appropriate, the head of the training
organisation. Such non-conformance should be recorded, for the purpose of
further investigation, in order to determine the cause and to enable the
Rev 2 dated ---------
24CIVIL AVIATION REQUIREMENTS SECTION 9
SERIES L PART IX 17th DECEMBER 2018
recommendation of appropriate corrective and preventive action.
5.3 The quality assurance audit programme should include procedures to ensure
that corrective and preventive actions are developed in response to findings.
5.4 These quality procedures should monitor such actions to verify their
effectiveness and that they have been completed. Organisational responsibility
and accountability for the implementation of corrective action resides with the
department where the finding was identified. The head of the training
organisation will have the ultimate responsibility for ensuring, through the quality
manager(s), that corrective action has re-established conformance with the
standard required by the ATSTO and any additional requirements established by
the DGCA or the ATSTO.
5.5 The ATSTO should identify internal and external customers, and monitor their
satisfaction by measuring and analysis of feedback.
6. Management review and analysis
6.1 Management should accomplish a comprehensive, systematic documented
review and analysis of the quality assurance system, training policies, and
procedures, and should consider:
6.1.1 The results of quality inspections, audits and any other indicators;
6.1.2 The overall effectiveness of the management organisation in
achieving stated objectives; and
6.2 Conclusions and recommendations made as a result of the review and analysis
should be submitted in writing to the responsible manager for action. The
responsible manager should be an individual who has the authority to resolve
issues and take action. The head of the training organisation should decide
upon the frequency, format, and structure of internal review and critical analysis
meetings.
7. Recording
7.1 Accurate, complete and readily accessible records documenting the result of the
quality assurance audit programme should be maintained by the ATSTO.
Records are essential data to enable an ATSTO to analyse and determine the
root causes of non-conformity, so that areas of non-compliance can be identified
and subsequently addressed.
7.2 The following records should be retained at least for the period that may be
required by national requirement. In the absence of such requirements, a period
of three years is recommended:
Rev 2 dated ---------
25CIVIL AVIATION REQUIREMENTS SECTION 9
SERIES L PART IX 17th DECEMBER 2018
7.2.1 Audit schedules;
7.2.2 Quality inspection and audit reports;
7.2.3 Responses to finding
7.2.4 Corrective and preventive action reports;
7.2.5 Follow-up and closure reports; and
7.2.6 Management review and analysis reports.
8. Quality assurance responsibility for satellite ATSTOs
8.1 An ATSTO may decide to sub-contract certain activities to external
organisations subject to the approval of the DGCA.
8.2 The ultimate responsibility for the training provided by the satellite ATSTO
always remains with the ATSTO. A written agreement should exist between the
ATSTO and the satellite ATSTO clearly defining the quality to be provided. The
satellite ATSTO's activities relevant to the agreement should be included in the
ATSTO's quality assurance audit programme.
8.3 The ATSTO should ensure that the satellite ATSTO has the necessary
authorization/approval when required, and commands the resources and
competence to undertake the task. If the ATSTO requires the satellite ATSTO
to conduct activity that exceeds the satellite ATSTO's authorization/approval,
the ATSTO is responsible for ensuring that the satellite ATSTO's quality
assurance takes account of such additional requirements.
9. Quality system training
9.1 Correct and thorough training is essential to optimize quality in every
organisation. In order to achieve significant outcomes of such training the
ATSTO should ensure that all staff understands the objectives as laid down in
the quality manual.
9.2 Those responsible for managing the quality assurance system should receive
training covering:
9.2.1 An introduction to the concept of quality assurance system;
9.2.2 Quality management;
9.2.3 Concept of quality assurance;
9.2.4 Quality manuals;
9.2.5 Audit techniques; and
9.2.6 Reporting and recording.
Rev 2 dated ---------
26CIVIL AVIATION REQUIREMENTS SECTION 9
SERIES L PART IX 17th DECEMBER 2018
10. The way in which the quality system will function in the ATSTO
Time should be provided to train every individual involved in quality assurance and for
briefing the remainder of the employees. The allocation of time and resources should be
governed by the size and complexity of the operation concerned.
11. Sources of personnel training
Quality assurance courses are available from the various national or international standards
institutions, and an ATSTO should consider whether to offer such courses to those likely
to be involved in the management of the Quality Assurance System. Organisations with
sufficient appropriately qualified staff should consider whether to carry out in-house
training.
(Faiz Ahmed Kidwai)
Director General of Civil Aviation
Rev 2 dated ---------
27Appendix-III A
Checklist for review of ATSTO Quality Assurance Manual
Application form for Approval/Renewal/Extension in scope of ATS Training Organisation shall
accompanied this compliance checklist. This Checklist shall be used as ATSTO’s compliance
statement and DGCA inspector checklist for acceptance of Quality Assurance Manual of ATSTO.
The ATSTO shall fill up checklist after ensuring each item.
Name of ATSTO:
Date:
Address of ATSTO:
Website & e-mail of ATSTO:
Name of Accountable manager:
Name of Head of Training/Chief Instructor:
Contact Numbers:
(A = Acceptable, U = Unacceptable)
S. Subject Quality To be filled by DGCA Office
No Assurance
A U REMARKS
Manual
reference
To be filled by ATSTO
Office
1. Quality Policy and Strategy –
Formal policy statement from head of training?
a) Explain what the system is intended to
achieve?
b) Cite continued compliance with the ATSTO’s
standards?
c) Does accountable manager have overall
responsibility for the Quality System?
2. Purpose –
Statement that quality system will enable the
ATSTO to monitor compliance with:
a) Relevant sections of CARs?
b) Training and procedures manual?
c) Any other standards established by the
ATSTO?
3. Quality Manager,
a) Do responsibilities include activities that
verify:
1) Standards required by DGCA and ATSTO
are being carried out properly under the
supervision of head of training/chief
instructor?
Rev 2 dated ---------
28CIVIL AVIATION REQUIREMENTS SECTION 9
SERIES L PART IX 17th DECEMBER 2018
2) Quality assurance programme is properly
implemented, maintained and continuously
renewed and improved?
3) Has access to head of training and all parts
of ATSTO?
b) Are head of training & quality manager
positions combined?
4. Quality System –
Ensure compliance with and adequacy of training
activities conducted?
a) Basic structure specified?
b) Structured according to size and complexity of
ATSTO?
5. Terminology –
Has the applicant included the required
terminology
6. Feedback System,
a) Corrective action identified and addressed?
b) Responsible person identified?
c) Procedure for when corrective action not
completed within stated time limit?
7. Relevant Documentation
a) Relevant parts of training and procedures
manual?
b) Quality policy?
c) Terminology?
d) Specified training standards?
e) A description of the organisation?
f) Allocation of duties and responsibilities?
g) Training procedures to ensure regulatory
ATSTO compliance?
h) Schedule of the monitoring process?
i) Audit procedures?
j) Follow-up and corrective action procedures?
k) Recording system?
l) The training syllabus?
m) Document control?
Rev 2 dated ---------
29CIVIL AVIATION REQUIREMENTS SECTION 9
SERIES L PART IX 17th DECEMBER 2018
8. Quality Assurance Programme,
Ensures that all training is conducted in accordance
with all applicable requirements, standards and
procedures?
9. Quality Inspection –
Ensures through observation that established
training procedures and requirements are followed
during the accomplishment of event and that
required standard was met?
10. Audit –
Procedure for explaining the scope of the audit?
a) Procedure for planning and preparation?
b) Process for gathering and recording evidence?
c) Process for analysis of the evidence?
11. Auditor’s Independence
a) No day-to-day involvement in the area to be
audited?
b) Procedures developed to ensure auditor selected
has no involvement with the activities to be
audited?
c) Full time auditor?
d) Part time auditor?
e) Internal?
f) External?
g) Persons within company authorized to conduct
quality inspections and audits, identify and
record findings and concerns, initiate
recommended solutions to concerns or findings
, verify the implementation of solutions and
report directly to the Quality Manager
identified?
12. Audit Scope –
Are the following areas included in the scope of
the ATSTO’s audits:
a) Organisation
b) Plans and objectives
c) Training Procedures
d) Manuals and records
e) Maintenance accomplishment
13. Audit Scheduling
a) Defined audit schedule?
b) Periodic review cycle?
c) Allow for unscheduled audits?
d) Allow for follow-up audits?
Rev 2 dated ---------
30CIVIL AVIATION REQUIREMENTS SECTION 9
SERIES L PART IX 17th DECEMBER 2018
e) All aspects of training reviewed in 12-month
period?
f) 12-month extension period accepted by
DGCA?
14. Monitoring and Corrective Action –
Procedure established to monitor regulatory
compliance on a continuing basis?
a) Is non-compliance communicated to the
relevant manager?
b) Is non-compliance recorded?
c) Are corrective actions developed in response
to findings?
d) Are corrective actions monitored to verify that
they have been completed?
e) Are corrective actions monitored to verify
effectiveness?
15. Corrective Action –
Following each quality inspection/audit, is:
a) Immediate need for corrective action
established?
b) Origin of the finding established?
c) Individual/department responsible for
implementing corrective action identified?
d) Accountable manager allocating resources
where appropriate?
Is the Quality Manager:
a) Verifying that the responsible manager takes
corrective action?
b) Evaluating the effectiveness of corrective
action through follow up?
16. Management Evaluation
a) Prevention of non-conformities?
b) Does the accountable manager determine
frequency, format and structure of management
evaluation activities?
17. Recording –
Process established for retaining the following
records for 5 years:
a) Audit schedules?
b) Quality inspection and audit reports?
c) Responses to findings?
d) Corrective action reports?
e) Follow-up and closure reports?
f) Management evaluation reports?
Rev 2 dated ---------
3118. Quality Assurance Responsibility for Satellite
ATSTOs
Are any ATSTO activities contracted out to
external organisations?
a) Does a written agreement exist between the
ATSTO and the satellite ATSTO?
b) Are the satellite ATSTO’s quality related
activities included in the primary ATSTO’s
quality assurance programme?
19. Quality System Training –
For those responsible for managing the quality
system, does training cover:
a) An introduction to the quality system concept?
b) Quality management?
c) Concept of quality assurance?
d) Quality manuals?
e) Audit techniques?
f) Reporting and recording?
g) The way the quality system will function in the
ATSTO?
For those not responsible for managing the quality
system, does training cover:
a) A briefing on the way the quality system will
function in the ATSTO?
20. Sources of Training
a) External?
b) Internal?
The information as mentioned on the page and para column has been verified from
the Training and Procedure Manual of ATSTO.
(Accountable Manager) (Head of Training/Chief
Instructor) Signature with Date: Signature
with Date:
For office use only:
Review by DGCA Inspector as under:
Remarks:
Actions required:
Name of DGCA Inspector conducted the review:
Date:
Rev 2 dated ---------
32