Home India Central Electricity Authority Central Electricity Authority hereby notifies the National E...
Date: 2013-12-31 Category: Extra Ordinary State: Union Government Country: India

Central Electricity Authority hereby notifies the National Electricity Plan. Volume I of the Plan covers the Generation and related aspects and Volume II covers the Transmission and related aspects. As per the stipulation of sub-section (4) of Section 3 of the Act, the Plan is in accordance with the National Electricity Policy, covering 11th Plan in detail and perspective planning for 12th and 13th Plans. The Plan is annexed in Appendix I (Volume I) and Appendix II (Volume II).

Issued by Central Electricity Authority · NOT available

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary:** This document announces the National Electricity Plan, as mandated by Section 3, Subsection 4 of the Electricity Act of 2003. The plan includes aspects of power generation and related elements in Section 1, and transmission and related aspects in Section 2. It aligns with the National Electricity Policy and includes the 11th plan in detail, as well as future plans for the 12th and 13th plans. **Key Points / Main Content:** * **Legislative Basis:** * The plan is notified under the Electricity Act, 2003, Section 3(4). * It aligns with the National Electricity Policy. * **Scope of the Plan:** * **Section 1:** Covers power generation and associated aspects. * **Section 2:** Covers transmission and associated aspects. * Includes the 11th Plan in detail. * Incorporates prospective planning for the 12th and 13th Plans. * **Plan Structure:** * Details are provided in Schedule 1, Section 1 and Schedule 2, Section 2. **Impact Analysis:** * **Central Electricity Authority:** * Impact: Responsible for implementing and overseeing the National Electricity Plan. * Action Required: Ensure the plan is executed in accordance with the Electricity Act of 2003 and aligned with the National Electricity Policy. * **Power Generation Companies:** * Impact: Affected by the generation-related provisions outlined in Section 1 of the plan. * Action Required: Align their generation strategies with the National Electricity Plan. * **Transmission Utilities:** * Impact: Impacted by the transmission-related provisions outlined in Section 2 of the plan. * Action Required: Ensure their transmission infrastructure development aligns with the National Electricity Plan. * **Electricity Consumers:** * Impact: Ultimately affected by the overall effectiveness and success of the National Electricity Plan. * Action Required: No direct action required; benefit from improved electricity infrastructure and policy.

Key Entities Referenced

vidyqr vfkfu;e 2003: Electricity Act 2003, mentioned as the basis for exercising powers by the Central Electricity Authority. cUsh; foqr izkfkdj.k: Central Electricity Authority, the entity notifying the National Electricity Plan. jkVh; foqr ;kts uk: National Electricity Plan, which includes production and related aspects as well as transmission and related aspects. jkVh; foqr uhfr: National Electricity Policy, which the plan is said to be in accordance with. 11oh a ;kts uk: 11th Plan, extensively included in the National Electricity Policy. 12oh a ;kts ukvk sa: 12th Plan, future plans included in the National Electricity Policy. 13oh a ;kts ukvk sa: 13th Plan, future plans included in the National Electricity Policy. Rkiu deq kj ckjbZ: Ripun Kumar Barai, Secretary, Central Electricity Authority
Official Source Record View Original Source →
See Full Document Text
jftLVªh laö Mhö ,yö&33004@99 REGD. NO. D. L.-33004/99 vlk/kj.k EXTRAORDINARY Hkkx III—[k.M 4 PART III—Section 4 izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY la- 344] ubZ fnYyh] eaxyokj] fnlEcj 31] 2013@ ikS"k 10] 1935 No. 344] NEW DELHI, TUESDAY, DECEMBER 31, 2013/PAUSA 10, 1935 ddddUUssUUssææææhhhh;;;; ffffoooo||||qrqrqrqr iiiizkzkzkzkffff////kkkkddddjjjj....kkkk vvvvffff////kkkkllllppwwppww uuuukkkk ub Z fnYyh] 30 fnlEcj] 2013 jjjjkkkk””””VVVVªªhhªªhh;;;; ffffoooo||||qrqrqrqr ;;;;kkkkttssttss uuuukkkk QQQQkkkk---- llll--aa--aa&&&&llllhhhhbbbb,,ZZ,,ZZ @@@@iiiihhhh,,,,yyyytttthhhh@@@@vvvvkkkkbbbbvvZZvvZZ kkkkjjjjiiiihhhh@@@@2222@@@@11110000@@@@2222000011113333----&&&& fo|qr vf/kfu;e] 2003 ¼ ftl s bld s ckn vf/kfu;e dgk tk,xk½ dh /kkjk 3 dh mi&/kkjk ¼4½ }kjk inz Ùk ‘kfDr;k sa dk i;z kxs djr s g,q dUsæh; fo|qr izkf/kdj.k ,rn}~ kjk jk”Vªh; fo|qr ;kts uk ¼ftl s bld s ckn ;kts uk dgk tk,xk½ dk s vf/klfwpr djrk g S A ;kts uk d s [kMa &1 e sa mRiknu ,o a lca fa/kr igy w ‘kkfey fd, x, g Sa rFkk [k.M&2 e sa lpa kj.k vkSj lca fa/kr igy w ‘kkfey fd, x, g Sa A vf/kfu;e dh /kkjk 3 dh mi&/kkjk ¼4½ e sa fn, x, fu:i.k d s vuqlkj] ;g ;kts uk jk”Vªh; fo|qr uhfr d s vu:q Ik g S ftle sa 11oh a ;kts uk foLrkj l s ‘kkfey g S rFkk 12oh a ,o a 13oh a ;kts ukvk sa dh Hkkoh ;kts uk, a ‘kkfey g Sa A ;kts uk ifjf’k”V&1 ¼[k.M&1½ rFkk ifjf’k”V&2 ¼[k.M&2½ e sa lya Xu g Sa A Rkiu deq kj ckjb]Z lfpo] d-sfo-izk- [ foKkiu&III@4@vlk-@186&ch@13] 5495 GI/2013 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] रररााांंं श श श(cid:6)(cid:6)(cid:6)ययय (cid:8)(cid:8)(cid:8)ववव(cid:10)(cid:10)(cid:10)ुतुतुत यययोोोजजजनननााा ( ) भाग-। उउउउ(cid:21)(cid:21)(cid:21)(cid:21)पप पप ााााददददनननन [(cid:8)व(cid:10)ुत अिधिनयम, 2003 क! धारा 3 (4) के अंतगत' के( ि(cid:6)य (cid:8)व(cid:10)ुत ूािधकरण क! बा- यता क! पूित ' म]/ भभभभााााररररतततत ससससररररककककाााारररर (cid:8)(cid:8)(cid:8)(cid:8)वववव(cid:10)(cid:10)(cid:10)(cid:10)ुतुतुतुत ममममऽऽंंऽऽंं ााााललललयययय ककककेेेे ((((िि िि (cid:6)(cid:6)(cid:6)(cid:6)यययय (cid:8)(cid:8)(cid:8)(cid:8)वववव(cid:10)(cid:10)(cid:10)(cid:10)ततुुततुु ूूूूााााििििधधधधककककररररणणणण uoEcj 2012¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 3 शशशश(cid:2)(cid:2)(cid:2)(cid:2)दद दद सससस(cid:7)(cid:7)ंं(cid:7)(cid:7)ंं पेेेे शशशश(cid:2)(cid:2)(cid:2)(cid:2)दद दद सससस(cid:7)(cid:7)ंं(cid:7)(cid:7)ंं पपेेपपेे ििििवववव(cid:12)(cid:12)(cid:12)(cid:12)तत तत ाााारररर एएएएससससीीीी अ(cid:2)ट रने(cid:8)टव कर(cid:11)ट एएएएजजजजीीीी एएएए(cid:18)(cid:18)(cid:18)(cid:18)डड डड एएएएससससपपपपीीीी (cid:12)व (cid:8)रत उ(cid:12)प ादन और आपू(cid:21)त काय(cid:23)(cid:24)म एएएएएएएएचचचचडडडड(cid:2)(cid:2)(cid:2)(cid:2)(cid:21)(cid:21) (cid:21)(cid:21) यय यय आआूूआआूू रररर एडवां(cid:29)ड हवै ी वाटर (cid:8)रए!ट र एएएए(cid:24)(cid:24)(cid:24)(cid:24)सस सस अिखल भारतीय आयु(cid:21)व'ान सं(cid:29)थ ान एएएएएएएएममममडडडडीीीी परमाणु खिनज िनदशे ालय एएएएपपपपीीीीएएएएमममम *शािसत क,मत तं- एएएएआआआआररररईईईईपपपपीीीी (cid:12)व (cid:8)रत .ामीण िव0ुतीकरण काय(cid:23)(cid:24)म बबबबीीीीएएएएआआआआररररससससीीीी भाभा परमाणु अनुसंधान के23 बबबबीीीीससससीीीीययययएएूूएएूू मममम,,,, बबबबीीीीससससीीीीएएएएमममम,,,, बबबबीीीीएएएएमममम3333 िबिलयन !य ूिबक मीटर बबबबीीीीईईईईईईईई ऊजा(cid:23) काय(cid:23)कुशलता 7य रू ो बबबबीीीीएएएएफफफफपपपपीीीी बॉयलर फ,ड प:प भभभभललेेललेे भारत हवै ी इलेि!<क(cid:2)स िलिमटेड बबबबीीीीएएएएससससईईईईएएएएसससस बॉ:ब े उपनगरीय िव0तु आपू(cid:21)त बबबबीीीीयययय ूू ूू िबिलयन यूिनट ससससीीीी एएएए(cid:18)(cid:18)(cid:18)(cid:18)डड डड आआआआईईईई िनयं-ण और इं(cid:29)> म(cid:11)टेशन ससससीीीीएएएएडडडडीीीी एएएए(cid:18)(cid:18)(cid:18)(cid:18)डड डड ससससीीीीएएएएएएएएमममम कं?य ूटर एडडे िडजाइन ए@ड कं?य ूटर एडडे मैनेजम(cid:11)ट ससससीीीीएएएएजजजजीीीीआआआआरररर िमिAत वा(cid:21)षक वृिD दर ससससीीीीबबबबीीीीआआआआईईईईपपपपीीीी के23 ीय कृिष और ऊजा(cid:23) बोड (cid:23) ससससीीीीबबबबीीीीएएएएमममम कोल बेड िमथेन ससससीीीीससससीीीीईईईईएएएए आ(cid:21)थक कायF पर मंि-मंडल सिमित ससससीीीीससससीीीीजजजजीीीीटटटटीीीी कंबाइंड साइकल गैस टबा(cid:23)इन ससससीीीीडडडडीीीी का:प ै!ट िड(cid:29)क ससससीीीीडडडडीीीीएएएएससससीीीी *गत संगणन िवकास के23 ससससीीीीडडडडीीीीएएएएमममम (cid:29)व Gछ िवकास तं- ससससीीीीईईईईएएएए के23 ीय िव0ुत *ािधकरण ससससीीीीएएएएफफफफबबबबीीीीससससीीीी सकु(cid:23)लेIटग JलूडाइKड बेड कं7श न ससससीीीीएएएएफफफफएएएएलललल कंपे!ट Jलोरेस(cid:11)ट लLप ससससीीीीएएएएफफफफआआआआररररआआआआईईईई के23 ीय Mधन अनुसंधान सं(cid:29)थ ान ससससीीीीआआआआईईईईएएएएलललल कोल इंिडया िलिमटेड ससससीीीीएएएएललललएएएए के23 ीय ऋण सहायता ससससीीीीपपपपीीीीपपपपीीीी कैि?टव पावर *ोNूसर ससससीीीीपपपपीीीीआआआआररररआआआआईईईई के23 ीय िव0ुत अनुसंधान सं(cid:29)थ ान ससससीीीीपपपपीीीीएएएएससससयययय ूू ूू के23 ीय साव(cid:23)जिनक Oे- उप(cid:24)म ससससीीीीआआआआररररएएएएसससस करोड़ ससससीीीीएएएएसससस के23 ीय Oे- ससससीीीीएएएएससससआआआआईईईईआआआआरररर वै'ािनक और औ0ोिगक अनसु ंधान प(cid:8)रषद ससससीीीीएएएएससससएएएएममममआआआआररररएएएएसससस के23 ीय मृदा एवं साम.ी अनुसंधान (cid:29)ट ेशन ससससीीीीडडडड(cid:2)(cid:2)(cid:2)(cid:2)(cid:21)(cid:21) (cid:21)(cid:21) यय यय ससूूससूू ीीीी के23 ीय जल आयोग डडडडीीीीएएएएईईईई परमाणु ऊजा(cid:23) िवभाग डडडडीीीीससससीीीी डायरे!ट कर(cid:11)ट डडडडीीीीडडडडीीीीजजजजीीीी िवके23 ीकृत िवत(cid:8)रत उ(cid:12)प ादन4 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] डडडडीीीीजजजजीीीीएएएएचचचच महािनदशे क हाइPोकाब(cid:23)न डडडडीीीीजजजजीीीी ससससटटेेटटेे डीजल जनरेIटग सेट ििििडडडड(cid:12)(cid:12)(cid:12)(cid:12)कक कक ॉॉॉॉमममम िवतरण कंपनी डडडडीीीीएएएएममममएएएएललललएएएएफफफफ डटे ा मैनेजम(cid:11)ट लोड फोरकाQ(cid:29)टग डडडडीीीीओओओओपपपपीीीीटटटटीीीी का(cid:21)मक और *िशOण िवभाग डडडडीीीीपपपपीीीीआआआआरररर िव(cid:29)त ृत प(cid:8)रयोजना (cid:8)रपोट(cid:23) डडडडीीीीएएएएससससएएएएमममम मांग – पO *बंधन डडडडीीीीएएएएससससटटटटीीीी िव'ान और *ौ0ोिगक, िवभाग डडडडीीीीएएएएससससटटटटीीीीएएएएटटटटीीीीससससीीीीओओओओएएएएमममम िड(cid:29)< ी7य ूशन (cid:29)ट े(cid:8)टक कंपे2 शेसन डडडडीीीीववववीीीीससससीीीी दामोदर वैली कॉपSरेशन डडडडीीीीववववीीीीआआआआरररर डाइनेिमक वो(cid:2)ट ेज रे(cid:29)ट ोरर ईईईईएएएए 2222000000003333 िव0ुत अिधिनयम, 2003 ईईईईससससीीीीआआआआईईईईएएएएलललल इले!< ोिनक कॉपSरेशन ऑफ इंिडया िलिमटेड ईईईईजजजजीीीीईईईईएएएएएएएएसससस िव0ुत उ(cid:12)प ादन िव(cid:29)त ार िवUल ेषण *णाली ईईईईएएएएननननएएएएसससस एनजV नॉट सWड (cid:23) ईईईईपपपपीीीीएएएएसससस इलेि!<क पावर सवX ईईईईआआआआररररडडडडीीीीएएएए िव0ुत अनसु ंधान और िवकास संघ ईईईईएएएएससससससससीीीीओओओओ ऊजा(cid:23) सेवा कंपनी ईईईईएएएएससससपपपपीीीी इले!< ो (cid:29)< े(cid:8)टक *ेसीिपटेटर ईईईईपपपपीीीीससससीीीी इंजीिनयIरग *ो!य ोरम(cid:11)ट कZ<े!ट एएएएफफफफएएएएययययूपूपूपूपीीीी Jलाई ऐश यू(cid:8)टलाइजेशन *ो.ाम एएएएफफफफबबबबीीीीससससीीीी JलूडाइKड बेड कं7श न एएएएफफफफओओओओ फो(cid:29)ड (cid:23) आउटेज एएएएफफफफओओओओआआआआरररर िनयामक] का फोरम जजजजीीीीससससीीीीववववीीीी .ॉस कैलो(cid:8)र^फक वै(cid:2)य ू जजजजीीीीडडडडीीीीपपपपीीीी सकल घरेल ू उ(cid:12)प ाद जजजजीीीीएएएएचचचचजजजजीीीी .ीन हाउस गसै जजजजीीीीआआआआईईईईएएएएसससस गैस इंसुलेटेड ि(cid:29)वच िगयर जजजजीीीीपपपपीीीीएएएएसससस भौगोिलक अवि(cid:29)थित *णाली जजजजीीीीआआआआरररर सामा2य समीOा जजजजीीीीएएएएससससपपपपीीीीससससीीीी गुजरात (cid:29)ट ेट पे<ोिलयम कॉपSरेशन जजजजीीीीटटटटीीीी गैस टबा(cid:23)इन जजजजीीीीडडडड(cid:2)(cid:2)(cid:2)(cid:2)(cid:21)(cid:21) (cid:21)(cid:21) यय यय ूूईईूूईई गीगा वाट (िव0ुत) एएएएचचचचबबबबीीीीजजजज ेे ेे हजीरा – बीजापुर – जगदीशपुर (पाइपलाइन) एएएएचचचचएएएएफफफफओओओओ हवै ी Jयूल ऑयल एएएएचचचचईईईईपपपपीीीी हाइPो इलेि!<क *ोजे!ट एएएएचचचचपपपपीीीीएएएएसससस हवै ी पे<ोिलयम (cid:29)ट ॉक एएएएचचचचआआआआररररडडडडीीीी मानव संसाधन िवकास एएएएचचचचएएएएससससडडडडीीीी हाई (cid:29)प ीड डीजल एएएएचचचचटटटटीीीी हाई ट(cid:11)शन एएएएचचचचववववीीीीडडडडीीीीएएएएसससस हाई वो(cid:2)ट ेज िवतरण *णाली आआआआईईईईडडडडीीीी इंNू(cid:29)ड PाJट¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 5 आआआआईईईईईईईईपपपपीीीी एक,कृत ऊजा(cid:23) नीित आआआआईईईईजजजजीीीीससससीीीीएएएएआआआआरररर इं^दरा गांधी परमाणु अनुसंधान के23 आआआआईईईईजजजजीीीीससससीीीीससससीीीी इंटी.ेटेड गैसी^फकेशन कंबाइंड साइकल आआआआईईईईआआआआईईईईएएएएससससससससीीीी भारतीय िव'ान सं(cid:29)थ ान आआआआईईईईआआआआईईईईटटटटीीीी *ौ0ोिगक, सं(cid:29)थ ान आआआआईईईईपपपपीीीीपपपपीीीी (cid:29)व तं- िव0ुत उ(cid:12)प ादक आआआआईईईईएएएएसससस भारतीय मानक आआआआईईईईएएएएससससससससीीीीससससीीीी इंटी.ेटेड सोलर कंबाइंड साइकल आआआआईईईईएएएएससससओओओओ अंतरा(cid:23)`< ीय मानक संगठन आआआआईईईईएएएएससससपपपपीीीीएएएएचचचचएएएएएएएएनननन इंटी.ेटेड िस(cid:29)ट म ?ल ाQनग आआआआईईईईटटटटीीीी सूचना *ौ0ोिगक, ककककेेेेससससीीीीएएएएएएएएलललल ^कलो कैलोरी ककककेेेेजजजजीीीी ^कलो.ाम ककककेेेेककककेेेेएएएएननननपपपपीीीीपपपपीीीी कुंडनकुलम परमाणु ऊजा(cid:23) प(cid:8)रयोजना ककककेेेेडडडड(cid:2)(cid:2)(cid:2)(cid:2)(cid:21)(cid:21) (cid:21)(cid:21) यय यय ूू ूू ^कलो वाट ककककेेेेडडडड(cid:2)(cid:2)(cid:2)(cid:2)(cid:21)(cid:21) (cid:21)(cid:21) यय यय एएूूएएूू चचचच ^कलो वाट घंटा एएएएललललईईईईपपपपीीीी जीवन िव(cid:29)त ार काय(cid:23)(cid:24)म एएएएललललएएएएफफफफ लोड फै!ट र एएएएललललएएएएननननजजजजीीीी तरल *ाकृितक गैस एएएएललललओओओओएएएए अिधिनण(cid:23)य का प- एएएएललललओओओओएएएएललललपपपपीीीी लोड लाभ*दता एएएएललललपपपपीीीी लीिनयर *ो.ाQमग एएएएललललआआआआररररववववीीीीआआआआईईईई लॉस (cid:8)रड!श न ए@ड वो(cid:2)ट ेज इं*ूवम(cid:11)ट एएएएललललएएएएससससएएएएचचचचएएएएसससस लो स(cid:2)फ र हवै ी (cid:29)ट ॉक एएएएललललटटटटीीीी लो ट(cid:11)शन एएएएललललडडडड(cid:2)(cid:2)(cid:2)(cid:2)(cid:21)(cid:21) (cid:21)(cid:21) यय यय आआूूआआूू रररर लाइट वाटर (cid:8)रए!ट र एएएएममममएएएएपपपपीीीीएएएएसससस म3ास परमाणु ऊजा(cid:23) (cid:29)ट ेशन एएएएममममससससीीीीएएएएफफफफससससीीीी मदर काबSनेट Jयूल सेल एएएएममममससससीीीीएएएएमममम िमिलयन !य ूिबक मीटर एएएएममममएएएएचचचचडडडडीीीी मैaन ेटो हाइPो डायनािम!स एएएएममममएएएएममममएएएएससससससससीीीीएएएएममममडडडडीीीी िमिलयन मी(cid:8)<क (cid:29)ट Lडड (cid:23) !य िू बक मीटर पर ड े एएएएममममएएएएननननआआआआररररईईईई नवीन एवं नवीकरणीय ऊजा (cid:23) मं-ालय एएएएममममएएएएननननपपपपीीीी 2य नू तम आवUय कता काय(cid:24)(cid:23) म एएएएममममओओओओईईईईएएएएफफफफ पया(cid:23)वरण और वन मं-ालय एएएएममममओओओओपपपपीीीी िव0ुत मं-ालय एएएएममममटटटटीीीी िमिलयन टन एएएएममममटटटटीीीीओओओओईईईई िमिलयन टन ऑयल इ^bल(cid:11)ट एएएएममममयययय ूू ूू िमिलयन यूिनट एएएएममममडडडड(cid:2)(cid:2)(cid:2)(cid:2)(cid:21)(cid:21) (cid:21)(cid:21) यय यय ूू ूू मेगा वाट एएएएममममडडडड(cid:2)(cid:2)(cid:2)(cid:2)(cid:21)(cid:21) (cid:21)(cid:21) यय यय ईईूूईईूू मेगा वाट इलेि!<क एएएएननननएएएएपपपपीीीीएएएएसससस नरौरा परमाणु ऊजा(cid:23) (cid:29)ट ेशन एएएएननननससससीीीीपपपपीीीीएएएएसससस नेशनल कैिपटल पावर (cid:29)ट ेशन एएएएननननडडडडीीीीटटटटीीीी नॉन ड(cid:29)े < ि!टव टे(cid:29)ट6 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] एएएएननननईईईईपपपपीीीी रा`< ीय िव0ुत नीित एएएएननननएएएएफफफफससससीीीी 2य िू !लयर Jयूल कॉ:प ले!स एएएएननननएएएएचचचचपपपपीीीीससससीीीी नेशनल हाइPो इलेि!<क पावर कॉपSरेशन एएएएननननएएएएममममडडडडीीीीएएएएसससस नेशनल िमनरल डवलपम(cid:11)ट कॉपSरेशन एएएएननननएएएएममममएएएएलललल नेशनल मेटाल(cid:21)जकल लैबोरेटरी एएएएननननओओओओएएएए(cid:2)(cid:2)(cid:2)(cid:2)सस सस नाइ<ोजन के ऑ!स ाइड एएएएननननपपपपीीीीससससीीीी रा`< ीय उ(cid:12)प ादकता प(cid:8)रषद एएएएननननपपपपीीीीससससीीीीआआआआईईईईएएएएलललल 2य िू !लयर पावर कॉपSरेशन ऑफ इंिडया िल. एएएएननननपपपपीीीीटटटटीीीीआआआआईईईई रा`< ीय िव0ुत *िशOण सं(cid:29)थ ान एएएएननननटटटटीीीीससससीीीी परमाणु *िशOण के23 एएएएननननटटटटीीीीपपपपीीीीससससीीीी नेशनल थम(cid:23)ल पावर कॉपSरेशन ओओओओससससीीीीजजजजीीीीटटटटीीीी ओपन साइकल गैस टबा(cid:23)इन ओओओओजजजजीीीीआआआआईईईईपपपपीीीी ऑ(cid:21)जनल गैस इन ?ल ेस ओओओओ एएएए(cid:18)(cid:18)(cid:18)(cid:18)डड डड एएएएमममम *चालन और रख रखाव पपपपीीीीएएएएएएएएफफफफससससीीीी फो(cid:29)फ ो(cid:8)रक एिसड Jयूल सेल पपपपीीीीससससीीीी प(cid:2)व राइKड कोल पपपपीीीीएएएएफफफफबबबबीीीीससससीीीी *से राइKड JलूडाइKड बेड कं7श न पपपपीीीीएएएएफफफफससससीीीी पावर फाइन(cid:11)स कॉपSरेशन पपपपीीीीएएएएफफफफआआआआरररर आरंिभक सभं ाWय ता (cid:8)रपोट(cid:23) पपपपीीीीजजजजीीीीससससीीीीआआआआईईईईएएएएलललल पावर ि.ड कॉपSरेशन इंिडया िलिमटेड पपपपीीीीएएएएचचचच हाइPोजन आयन सां3ण पपपपीीीीआआआआईईईईईईईई उ(cid:12)क ृ`ट ा म(cid:11) भागीदार पपपपीीीीआआआआईईईईबबबबीीीी साव(cid:23)जिनक िनवेश बोड (cid:23) पपपपीीीीएएएएचचचचडडडड(cid:2)(cid:2)(cid:2)(cid:2)(cid:21)(cid:21) (cid:21)(cid:21) यय यय आआूूआआूू रररर *ेसराइKड हवै ी वाटर (cid:8)रए!ट र पपपपीीीीएएएएललललएएएएफफफफ ?ल ांट लोड फै!ट र पपपपीीीीएएएएममममजजजजीीीीववववााााईईईई *धानमं-ी .ामोदय योजना पपपपीीीीएएएएममममआआआआईईईई िव0ुत *बंधन सं(cid:29)थ ान पपपपीीीीएएएएममममओओओओ *धानमं-ी काया(cid:23)लय पपपपीीीीपपपपीीीीएएएएमममम पाdस(cid:23) पर िमिलयन पपपपीीीीएएएएसससस िनजी Oे- पपपपीीीीएएएएससससससससीीीी उ(cid:12)प ादन साझा संिवदा पपपपीीीीएएएएससससपपपपीीीी पावर स?ल ाई पोिजशन पपपपीीीीएएएएससससएएएएसससस प:प (cid:29)ट ोरेज (cid:29)क ,म पपपपीीीीएएएएससससयययय ूू ूू साव(cid:23)जिनक Oे- उप(cid:24)म आआआआरररर एएएए(cid:18)(cid:18)(cid:18)(cid:18)डड डड डडडडीीीी अनुसंधान एवं िवकास आआआआरररर एएएए(cid:18)(cid:18)(cid:18)(cid:18)डड डड एएएएमममम नवीनीकरण और आधुिनक,करण आआआआररररएएएएपपपपीीीीपपपपीीीी राज(cid:29)थ ान ऐटिमक पावर *ोजे!ट आआआआररररएएएएपपपपीीीीएएएएसससस राज(cid:29)थ ान ऐटिमक पावर (cid:29)ट ेशन आआआआररररईईईईबबबबीीीी Oे-ीय िव0ुत बोड (cid:23) आआआआररररईईईईससससीीीी .ामीण िव0ुतीकरण िनगम आआआआररररईईईईडडडडीीीीबबबबीीीी .ामीण िव0ुत िवतरण बैक बोन आआआआररररएएएएचचचचईईईई .ामीण प(cid:8)रवार िव0ुतीकरण¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 7 आआआआररररएएएएललललएएएए रेिसडुअल लाइफ असेसम(cid:11)ट आआआआररररएएएएमममम आरिOत मा(cid:21)जन एएएएससससएएएएएएएएआआआआररररससससीीीी Oे-ीय सहयोग के िलए दिOण एिशयाई संघ एएएएससससईईईईबबबबीीीी राKय िव0तु बोड (cid:23) एएएएससससईईईईआआआआररररससससीीीी राKय िव0तु िनयामक आयोग एएएएससससओओओओजजजजीीीी (cid:29)व ीकृत और जारी एएएएससससओओओओएएएए(cid:2)(cid:2)(cid:2)(cid:2)सस सस स(cid:2)फ र ऑ!स ाइड एएएएससससपपपपीीीीआआआआईईईईससससीीीी साउदन(cid:23) पे<ो इंिडया केिमक(cid:2)स िलिमटेड एएएएससससपपपपीीीीएएएएमममम स(cid:29)प (cid:11)डडे पाeटकुलेट मैटर एएएएससससएएएएसससस राKय Oे- एएएएससससएएएएससससबबबबीीीी सोिलड (cid:29)ट ेट fेकर एएएएससससएएएएससससटटटटीीीीएएएएसससस सोिलड (cid:29)ट ेट <ांसफर ि(cid:29)वचेज एएएएससससटटटटीीीीपपपपीीीीपपपपीीीी सुपर थम(cid:23)ल पावर ?ल ांट एएएएससससटटटटीीीीपपपपीीीीएएएएसससस सुपर थम(cid:23)ल पावर (cid:29)ट ेशन एएएएससससटटटटीीीीययययएएूूएएूू सससस राKय पारेषण कंपिनया ं टटटटीीीी एएएए(cid:18)(cid:18)(cid:18)(cid:18)डड डड डडडडीीीी पारेषण और िवतरण टटटटीीीीएएएएपपपपीीीीपपपपीीीी तारापुर परमाणु ऊजा(cid:23) प(cid:8)रयोजना टटटटेेएएेेएएपपपपीीीीएएएएसससस तारापुर परमाणु ऊजा(cid:23) (cid:29)ट ेशन टटटटीीीीआआआआईईईईएएएएफफफफएएएएससससीीीी *ौ0ोिगक, सूचना पूवा(cid:23)नुमान और मू(cid:2)य ांकन प(cid:8)रषद टटटटीीीीओओओओयययय ूू ूू उपयोग का समय टटटटीीीीपपपपीीीीएएएएसससस थम(cid:23)ल पावर (cid:29)ट ेशन ययययससूूससूू ीीीीआआआआईईईईएएएएलललल यूरेिनयम कॉपSरेशन ऑफ इंिडया िल. ययययएएूूएएूू ममममपपपपीीीीपपपपीीीी अ(cid:2)< ा मेगा पावर *ोजे!ट ययययएएूूएएूू नननन संयु!त रा`< ययययएएूूएएूू ननननडडडडीीीीपपपपीीीी संयु!त रा`< िवकास काय(cid:23)(cid:24)म ययययटटूूटटूू ीीीी संघ राKय ववववीीीीईईईईआआआआईईईई .ाम िव0ुतीकरण अवसंरचना डडडड(cid:2)(cid:2)(cid:2)(cid:2)(cid:21)(cid:21) (cid:21)(cid:21) यय यय बबूूबबूू ीीीीपपपपीीीीडडडडीीीीससससीीीीएएएएलललल पिgम बंगाल िव0ुत िवकास िनगम िल.8 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] अअअअ(cid:10)(cid:10)(cid:10)(cid:10)यय यय ाााायययय 1111 !!!!(cid:12)(cid:12)(cid:12)(cid:12)तत तत ााााववववननननाााा 1111....0000 पपपपृ#ृ#ृ#ृ#ठठ ठठ भभभभििूूििूू मममम िव0ुत Oे- क, वृिD और िवकास हमारे दशे के आ(cid:21)थक िवकास म(cid:11) मह(cid:12)व पूण(cid:23) भूिमका अदा करता ह।ै िव0ुत के उ(cid:12)प ादन म(cid:11) वृिD के प(cid:8)रणाम(cid:29)व iप आगामी पंचवषVय योजनाj म(cid:11) अथ(cid:23)Wय व(cid:29)थ ा के सभी Oे-] म(cid:11) िव0ुत का सघन *योग ^कया जाएगा। 31 माच(cid:23), 2012 क, ि(cid:29)थित के अनुसार कुछ वषF म(cid:11) पावर ?ल ांट] (िव0ुत कंपिनय]) क, (cid:29)थ ािपत Oमता बढ़कर लगभग 1,99,877 मेगावाट हो गई ह ै जो वष(cid:23) 1950 म(cid:11) महज 1713 मेगावाट थी। इसी *कार वष(cid:23) 2011-12 म(cid:11) िव0ुत का उ(cid:12)प ादन भी लगभग 5.1 िबिलयन यूिनट स े बढ़कर 877 िबिलयन यूिनट हो गया ह।ै दशे म(cid:11) *ित Wय िl िव0ुत क, खपत भी 1950 म(cid:11) 15 ^कलोवाट से बढ़कर वष(cid:23) 2011 म(cid:11) लगभग 819 ^कलोवाट हो गई ह।ै लगभग 95% गांव] का िव0तु ीकरण कर ^दया गया ह।ै हालां^क दशे म(cid:11) लगातार मांग और आपू(cid:21)त के बीच अंतर बना mआ ह ै तथा वष(cid:23) 2011-12 के दौरान ऊजा (cid:23) और अिधकतम कमी (cid:24)मश: 8.5% और 10.6% के आसपास रही। वत(cid:23)मान म(cid:11) जारी आरजीजीवीवाई (राजीव गांधी .ामीण िव0ुतीकरण योजना) म(cid:11) यह प(cid:8)रक(cid:2)प ना क, गई ह ै ^क .ामीण Oे-] के प(cid:8)रवार को िबजली उपल7ध कराई जाए। भारत म(cid:11) िबजली क, *ित Wय िl खपत िवUव क, तुलना म(cid:11) औसतन 24% ह ै तथा चीन और fाजील का *ितशत (cid:24)मश: 35% और 28% ह।ै 1111....1111 ििििवववव%%%%ततुुततुु अअअअििििधधधधििििननननययययमममम औऔऔऔरररर रररराााा####(( (( ीीीीयययय ििििवववव%%%%ततुुततुु ननननीीीीिििितततत 1111....1111....1111 ििििवववव%%%%ततुुततुु अअअअििििधधधधििििननननययययमममम,,,, 2222000000003333 औऔऔऔरररर रररराााा####(( (( ीीीीयययय ििििवववव%%%%ततुुततुु ययययोोोोजजजजननननाााा सससस ेे ेेससससबबंंबबंं ििंंििंं धधधधतततत ििििववववललललखखेेखखेे िव0ुत अिधिनयम, 2003 म(cid:11) ऐसे समथ(cid:23)कारी िवधान का *ावधान ^कया गया ह ै जो उपभो!त ाj के िहत] को nय ान म(cid:11) रखत े mए पारदशV और *ितयोगी प(cid:8)रवेश म(cid:11) िव0ुत Oे- के िवकास क, दिृ o से अनुकूल ह।ै िव0ुत अिधिनयम, 2003 क, धारा 3 (4) के अनुसार क(cid:11)3ीय िव0ुत *ािधकरण को रा`< ीय िव0तु नीित के अनुसार एक रा`< ीय िव0ुत योजना तैयार करने और पांच वष(cid:23) म(cid:11) एक बार ऐसी योजना को अिधसूिचत करने क, आवUय कता ह।ै मसौदा योजना *कािशत क, गई और लाइस(cid:11)सधारक], उ(cid:12)प ादन कंपिनय] और जनता से एक िनधा(cid:23)(cid:8)रत समयाविध के भीतर उनके सुझाव और आपिqयां आमंि-त क, गM। इस योजना को के2 3 सरकार का lw अनुमोदन *ा?त करने के पUच ात अिध िचत ^कया जाना ह।ै रा`< ीय िव0ुत नीित म(cid:11) यह िवलेख ^कया गया ह ै ^क क(cid:11)िव*ा rारा तैयार क, गई और के23 सरकार rारा अनमु ो^दत योजना का इ(cid:29)त ेमाल संभािवत उ(cid:12)प ादन कंपिनय], पारेषण कंपिनय] और पारेषण/िवतरण लाइस(cid:11)सधारक] rारा एक संदभ(cid:23) द(cid:29)त ावेज के iप म(cid:11) ^कया जा सकता ह।ै 1111....1111....2222 रररराााा####(( (( ीीीीयययय ििििवववव%%%%ततुुततुु ननननीीीीिििितततत औऔऔऔरररर रररराााा####(( (( ीीीीयययय ििििवववव%%%%ततुुततुु ययययोोोोजजजजननननाााा सससस ेे ेेससससबबंंबबंं ििंंििंं धधधधतततत ििििववववललललखखेेखखेे रा`< ीय िव0ुत नीित के लsय और उtUे य िन:न ानसु ार ह L : • िव0ुत अिभगम – आगामी पांच वष(cid:23) म(cid:11) सभी प(cid:8)रवार] के िलए उपल7ध होगी। • िव0ुत क, उपल7ध ता – 2012 तक संपूण(cid:23) मांग पूरी क, जाए। ऊजा(cid:23) और अिधकतम मांग के समय इसक, कमी क, सम(cid:29)य ा को दरू ^कया जाए और पया(cid:23)?त मा-ा म(cid:11) आरिOत िबजली (ि(cid:29)पQनग (cid:8)रजव(cid:23)) उपल7ध हो। • दO ढंग से और उिचत दर] पर िविनvद`ट मानक] पर आधा(cid:8)रत िवUव सनीय और गुणव(cid:12)त ायु!त िबजली क, आपू(cid:21)त।¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 9 • *ित Wय िl िव0ुत क, उपल7ध ता को वष(cid:23) 2012 तक 1000 यूिनट से अिधक ^कया जाए। • वष(cid:23) 2012 तक एक उ(cid:12)क ृ`ट िवशेषता के iप म(cid:11) 2य ूनतम एक यूिनट *ित प(cid:8)रवार *ित^दन क, जीवनदायी खपत सुिनिgत क, जाए। • िव0ुत Oे- का िव(cid:12)त ीय कायाक(cid:2)प और वािणिKय Wय वहाय(cid:23)ता। • उपभो!त ाj के िहत] क, रOा। नीित के अनुसार रा`< ीय िव0ुत योजना पांच वष (cid:23) के अ(cid:2)प कािलक ढांचे के िलए तैयार क, जाएगी जब ^क उसम (cid:11) 15 वष(cid:23) क, संभािवत योजनाj क, प(cid:8)रक(cid:2)प ना के साथ साथ िन:न िलिखत तwय शािमल ह]गे : • िविभ2न Oे-] के िलए अ(cid:2)प कािलक और दीघ(cid:23)कािलक मांग संबंधी पूवा(cid:23)नुमान; • उ(cid:12)प ादन और पारेषण क, िमतWय ियता, *णाली क, हािनय], लोड के23 क, आवUय कताj, ि.ड ि(cid:29)थरता, आपू(cid:21)त क, सुरOा, वो(cid:2)ट ेज *ोफाइल सिहत िव0ुत क, गुणव(cid:12)त ा आ^द तथा पुनवा(cid:23)स और पुन(cid:29)थ ा(cid:23)पना सिहत पया(cid:23)वरण संबंधी पहलुj को nय ान म(cid:11) रखते mए उ(cid:12)प ादन और पारेषण के Oे- म(cid:11) Oमता अिभवृिD के िलए सुझाए गए Oे-/(cid:29)थ ान; • पारेषण *णािलय] के *कार और *चुर मा-ा म(cid:11) उनक, आवUय कता सिहत रा`< ीय ि.ड के िवकास और पारेषण *णाली के साथ ऐसे संभािवत (cid:29)थ ान] को जोड़ना; • दO उ(cid:12)प ादन, पारेषण और िवतरण के िलए उपल7ध िविभ2न *ौ0ोिग^कयां; और • िमतWय ियता पर आधा(cid:8)रत Mधन के िवक(cid:2)प , ऊजा(cid:23) सुरOा और पया(cid:23)वरण संबंधी पहलू। इस नीित म(cid:11) यह भी उ(cid:2)ल ेख ^कया गया ह ै ^क रा`< ीय िव0ुत योजना तैयार करते समय क(cid:11)3ीय िव0ुत *ािधकरण सभी पणधारक] स े परामश(cid:23) करेगा, िजसम(cid:11) राKय सरकार(cid:11) शािमल ह L और राKय सरकार(cid:11) संगत राKय ] के (cid:29) तर पर िवतरण लाइस(cid:11)सधारक] तथा एसटीयू सिहत सभी पणधारक] के सहयोग स े यह काय(cid:23) कर(cid:11)गी। अ(cid:2)प कािलक और दीघ(cid:23)कािलक मांग का मू(cid:2)य ांकन करन े के िलए आविधक iप स े ^कए जान े वाले अnय यन] के दौरान िवतरण कंपिनय] rारा लगाए गए पवू ा(cid:23)नुमान] को अपेिOत मह(cid:12)व ^दया जाएगा। क(cid:11)3ीय िव0ुत *ािधकरण ऐसे सं(cid:29)थ ान] और एज(cid:11)िसय] से भी संपक(cid:23) करेगा जो िवशेष iप से मांग संबंधी पूवा(cid:23)नुमान लगाने के Oे- म(cid:11) काय(cid:23)रत ह।L अथ(cid:23)Wय व(cid:29)थ ा के िविभ2न Oे-] के िलए अनुमािनत मांग दर] को भी मांग संबंधी पूवा(cid:23)नुमान लगाते समय nय ान म (cid:11) रखा जाएगा। इस नीित म(cid:11) यह भी उ(cid:2)ल ेख ^कया गया ह ै ^क 85% क, (cid:29)थ ािपत Oमता क, संपूण(cid:23) उपल7ध ता सुिनिgत करने के अलावा रा`< ीय (cid:29)त र पर कम से कम 5% आरिOत िव0ुत का *ावधान ^कए जान े क, आवUय कता ह ै िजससे ^क ि.ड सुरOा और िव0तु आपू(cid:21)त क, गुणव(cid:12)त ा तथा िवUव सनीयता सुिनिgत क, जा सके। नीित म(cid:11) उ(cid:2)ल ेख ^कया गया ह ै ^क िव0ुत के उत् पादन हते ु कंपिनय] क, लागत *भावशीलता (cid:29)थ ािपत हो जाने पर दO *ौ0ोिग^कय] जैसे सुपर ^(cid:24)(cid:8)टकल *ौ0ोिगक,, आईजीसीसी आ^द; और बड़ी Oमता वाली यूिनट] क, परंपरा धीरे धीरे शुi क, जाएगी। 1111....2222 ससससररररककककाााारररर ////ाााारररराााा शशशश00ुु00ुु 1111ककककएएएए गगगगएएएए ििििववववििििभभभभ4444नन नन !!!!ययययाााासससस 1111....2222....1111 टटटटैै66ैै66ररररफफफफ आआआआधधधधाााा6666ररररतततत बबबबोोोोललललीीीी !!!!11118888ययययाााा ककककेेेे जजजज6666ररररएएएए ििििवववव%%%%ततततुुुु पपपप6666ररररययययोोोोजजजजननननाााा9999 ककककाााा ििििववववककककाााासससस10 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] भारत म (cid:11) िव0ुत Oे- म(cid:11) *ित(cid:29)प धा(cid:23) को बढ़ावा दने ा िव0तु अिधिनयम, 2003 (अिधिनयम) के *मुख उtUे य ] म(cid:11) स े एक ह।ै िवतरण लाइसस(cid:11) धारक] rारा िव0तु क, *ित(cid:29)प धा(cid:23)(cid:12)म क खरीद से अपेOा ह ै ^क िव0ुत खरीद क, संपूण(cid:23) लागत कम होगी और इससे िव0ुत बाजार] का िवकास सकु र बनेगा। अिधिनयम क, धारा 61 और 62 म(cid:11) टै(cid:8)रफ संबंधी िविनयम और उ(cid:12)प ादन, पारेषण, Wह ीQलग तथा िव0ुत क, फुटकर िब(cid:24), के िलए टै(cid:8)रफ का िनधा(cid:23)रण उपयु!त आयोग rारा ^कए जान े सबं ंधी *ावधान ^कए गए ह।L अिधिनयम क, धारा 63 म(cid:11) उ(cid:2)ल ेख ^कया गया ह ै ^क “धारा 62 म (cid:11) िनिहत ^कसी भी बात के होत े mए भी उपय!ु त आयोग को ऐस े ट(cid:8)ै रफ को अपनाना होगा जो के23 सरकार rारा जारी ^कए गए ^दशािनदशX ] के अनुसार पारदशV बोली *^(cid:24)या के ज(cid:8)रए िनधा(cid:23)(cid:8)रत ^कया गया ह”ै टै(cid:8)रफ आधा(cid:8)रत बोली *^(cid:24)या के ज(cid:8)रए िव0तु क, खरीद को सुकर बनाने के िलए 5 जनवरी, 2006 को टै(cid:8)रफ नीित जारी क, गई। जनवरी, 2006 म(cid:11) भारत सरकार rारा अिधसूिचत क, गई नई टै(cid:8)रफ नीित के अनसु ार सभी िवतरण कंपिनय] (िड(cid:29)क ॉम) के िलए 6 जनवरी, 2011 से *ित(cid:29)प धा(cid:23)(cid:12)म क टै(cid:8)रफ आधा(cid:8)रत बोली *^(cid:24)या के ज(cid:8)रए िव0ुत क, खरीद अिनवाय(cid:23) कर दी गई। मामला 1 और मामला 2 बोली *^(cid:24)या के अंतग(cid:23)त राKय ] rारा िव0तु प(cid:8)रयोजनाj का िवकास िन:न ानसु ार ^कया जा सकता ह ै : ((((iiii)))) जहां (cid:24)ेता rारा (cid:29)थ ान, *ौ0ोिगक, अथवा Mधन िविनvद`ट नहz ^कया जाता हहहह ैै ैै((((ककककेेेेसससस 1111))));;;; (ii) जल िव0ुत प(cid:8)रयोजनाए,ं लोड के23 प(cid:8)रयोजनाए ं अथवा (cid:29)थ ान िवशेष पर आधा(cid:8)रत अ2य प(cid:8)रयोजनाए ं िजनके िलए िविश`ट Mधन आवं(cid:8)टत ^कया जाता ह ै जैस े कैि?टव खान(cid:11) उपल7ध हL, और जो (cid:24)ेता टै(cid:8)रफ आधा(cid:8)रत बोली *^(cid:24)या के ज(cid:8)रए (cid:29)थ ािपत करना चाहता ह ै ((((ककककेेेेसससस 2222))))।।।। िव0ुत मं-ालय rारा िवतरण लाइस(cid:11)सधारक] rारा िव0ुत क, खरीद के िलए ^दशािनदशX और और मानक बोली द(cid:29)त ावेज जारी ^कए गए ह।L ह(cid:8)रयाणा, उ(cid:12)त र *दशे , गजु रात, महारा`< आ^द म(cid:11) बmत सी प(cid:8)रयोजनाए ं टै(cid:8)रफ आधा(cid:8)रत *ितयोगी बोली *^(cid:24)या के ज(cid:8)रए काया(cid:23)ि2वत क, जा रही ह L (ककककेेेेसससस 1/ककककेेेेसससस 2)। 1111....2222....2222 अअअअ(cid:21)(cid:21)(cid:21)(cid:21)(( (( ाााा ममममेगेगेगेगाााा पपपपााााववववरररर पपपप6666ररररययययोोोोजजजजननननाााा9999 ककककाााा ििििववववककककाााासससस ट(cid:8)ै रफ आधा(cid:8)रत *ितयोगी बोली *^(cid:24)या के अतं गत(cid:23) लगभग 4000 मगे ावाट Oमता वाली कोयला आधा(cid:8)रत अ(cid:2)< ा मेगा पावर प(cid:8)रयोजनाj (यूएमपीपी) के िवकास हते ु सरकार rारा एक पहल शुi क, गई ह।ै अ(cid:2)< ा मेगा पावर प(cid:8)रयोजनाj क, (cid:29)थ ापना या तो घरेलू कोयला पर आधा(cid:8)रत िपट हडे (cid:29) थल] पर अथवा आयात ^कए गए कोयला पर आधा(cid:8)रत तटवतV (cid:29)थ ान] म(cid:11) क, जाएगी। (cid:29)थ ानीय कोयला पर आधा(cid:8)रत यूएमपीपी के िलए प(cid:8)रयोजना िवकासकता (cid:23) को कोयला 7ल ाक भी आवं(cid:8)टत ^कया जाएगा। इसका उtUे य तेजी से Oमता अिभवृिD करना और उपभो!त ाj के िलए िमतWय ियता के पैमाने के आधार पर िव0ुत क, लागत को कम करना ह।ै चार अ(cid:2)< ा मेगा पावर प(cid:8)रयोजनाए ं िवकासकता(cid:23)j को पहले ही स{पी जा चुक, हL, िजनका चयन टै(cid:8)रफ आधा(cid:8)रत *ितयोगी बोली *^(cid:24)या के ज(cid:8)रए ^कया गया। पहले से ह(cid:29)त ांत(cid:8)रत क, जा चुक, यूएमपीपी म(cid:11) गुजरात ि(cid:29)थत मु्ं3ा यूएमपीपी, मnय *दशे म(cid:11) सासन यूएमपीपी, आं| *दशे म(cid:11) कृ`ण ाप}नम यूएमपीपी और झारखंड म(cid:11) ितलैया यूएमपीपी शािमल ह।L मुं3ा और सासन यूएमपीपी का िनमा(cid:23)ण काय(cid:23) भी शुi हो गया ह।ै मुं3ा यूएमपीपी क, 800 मेगावाट Oमता वाली पहली और दसू री यूिनट का िनमा(cid:23)ण काय(cid:23) (cid:24)मश: 8.1.2012 और 10.7.2012 को लगभग साथ साथ पूरा ^कया गया और (cid:24)मश: 7 माच(cid:23), 2012 तथा 30 जुलाई 2012 को दोन] यूिनट] का वािणिKयक *चालन शुi ^कया गया। मुं3ा यूएमपीपी क, 800 मगे ावाट Oमता वाली तीसरी यूिनट क, (cid:29)थ ापना 6.10.2012 को पूरी क, गई। मुं3ा¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 11 यूएमपीपी क, 800 मेगावाट Oमता वाली शेष बची यूिनट] तथा और सासन यूएमपीपी क, 660 मेगावाट Oमता वाली सभी 6 यिू नट] क, (cid:29)थ ापना 12वz पंचवषVय योजना के दौरान होन े क, आशा ह।ै ितलैया यूएमपीपी के िलए भूिम अिध.हण और अ2य आरंिभक काय(cid:23) जारी ह।L ितलयै ा यूएमपीपी क, 660 मेगावाट Oमता वाली पांच यूिनट] क, (cid:29)थ ापना 12वz पंचवषVय योजना अविध के दौरान अिधसूिचत ह ै और 660 मेगावाट Oमता वाली एक यूिनट क, (cid:29)थ ापना 13वz पंचवषVय योजना अविध के दौरान अिधसूिचत ह।ै कृ`ण ाप}नम अ(cid:2)< ा मेगा पावर प(cid:8)रयोजना का िवकासकता(cid:23) अथा(cid:23)त मैसस(cid:23) को(cid:29)ट ल आ|ं पावर िलिमटेड ने िनमा(cid:23)ण काय(cid:23) *ारंभ कर ^दया था, परंतु उसन े इंडोनेिशया सरकार के नए िविनयम को कारण बतात े mए िनमा(cid:23)ण काय(cid:23) रोक ^दया ह।ै िजसम(cid:11) संबD कंपिनय] को ब(cid:11)च माक(cid:23) से कम क,मत पर िब(cid:24), सिहत कोयले क, िब(cid:24), को रोकने का *ावधान ^कया गया। एपीएसपीडीसीएल जो ^क अ.णी खरीददार ह,ै ने सीएपीएल को िनलंबन नो(cid:8)टस जारी ^कया ह।ै सीएपीएल ^द(cid:2)ल ी उGच 2य ायालय न े ^दनांक 2.7.2012 को सीएपीएल क, यािचका खा(cid:8)रज कर दी ह।ै सीएपीएल ने ^द(cid:2)ल ी उGच 2य ायालय क, संभागीय ब(cid:11)च के साथ साथ माnय (cid:29)थ म के िलए भारतीय माnय (cid:29)थ म प(cid:8)रषद का भी दरवाजा खटखटाया ह।ै मामला 2य ायालय के िवचाराधीन ह।ै मूल iप से िचि~नत क, गई नौ अल् <ा मेगा पावर प(cid:8)रयोजनाj के अलावा कुछ राKय ] म(cid:11) अित(cid:8)र!त यूएमपीपी क, (cid:29)थ ापना के िलए भी कुछ राKय सरकार] स े अनुरोध *ा?त mए ह L : i) आं| *दशे म(cid:11) – 4000 मेगा वाट Oमता वाली दसू री यूएमपीपी ii) उड़ीसा म(cid:11) 4000 मेगावाट Oमता वाली दो अित(cid:8)र!त यूएमपीपी iii) गुजरात म(cid:11) 4000 मेगावाट Oमता वाली दसू री यूएमपीपी iv) झारखंड म(cid:11) 4000 मेगावाट Oमता वालीदसू री यूएमपीपी v) तिमलनाडु म(cid:11) 4000 मेगावाट Oमता वालीदसू री यूएमपीपी vi) िबहार म(cid:11) 4000 मेगावाट Oमता वाली यूएमपीपी उपयु(cid:23)!त अित(cid:8)र!त यूएमपीपी के िलए (cid:29)थ ल का चयन/खोज का काय(cid:23) संबंिधत राKय सरकार] के परामश(cid:23) से चल रहा ह।ै मूल iप से प(cid:8)रकि(cid:2)पत नौ यमएमपीपी और अित(cid:8)र!त सात यूएमपीपी क, अ0तन ि(cid:29)थित अअअअननननबबुुबबुु धधंंधधंं –1111....1111 म(cid:11) दी गई ह।ै 1111....2222....3333 ककककैैैैिििि::::टटटटवववव ककककोोोोययययललललाााा (cid:2)(cid:2)(cid:2)(cid:2)लल लल ााााकककक;;;; ककककाााा आआआआववववटटंंटटंं नननन दशे म(cid:11) कोयले का उ(cid:12)प ादन िविभ2न कारण] से िव0तु O-े क, बढ़ रही मांग के साथ गित नहz पकड़ रहा ह।ै दशे म(cid:11) कोयला खान] के िवकास म(cid:11) िवलंब इसके *मुख कारण] म(cid:11) से एक ह।ै इसके परिणाम(cid:29)व iप कोयले के आयात क, आवUय कता बढ़ गई। इसके अलावा 11वz पंचवषVय योजना के दौरान क, गई Oमता अिभवृिD और 12वz पंचवषVय योजना और उसस े आगामी पंचवषVय योजनाj के दौरान बड़ े Oमता अिभवृिD काय(cid:23)(cid:24)म तथा िपछली कुछ पंचवषVय याजनाj के दौरान प(cid:8)रक(cid:2)प ना से परे वा(cid:29)त िवक Oमता अिभवृिD के कारण ि(cid:29)थित और भी गंभीर हो गई ह ै और घरेल ू कोयल े क, मांग और आपू(cid:21)त के बीच अंतर और अिधक बढ़ गया ह।ै इसिलए यह िनUच य ^कया गया ह ै ^क प(cid:8)रयोजना के िवकासकता(cid:23)j को कैि?टव *योग के िलए कोयला 7ल ॉक] का आवंटन ^कया जाए। िपट हडे आधार पर (cid:29)थ ािपत क, जा रही सभी यूएमपीपी को कोयला 7ल ॉक आवं(cid:8)टतकर ^दए गए ह।L12 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] िविभ2न िव0ुत कंपिनय] को आवं(cid:8)टत कोयला 7ल ाक] क, सं(cid:127)य ा और कोयला 7 लाक] के भूगभVय आरिOत भंडार] के िववरण नीच े तािलका 1.1 म(cid:11) ^दए गए : ततततााााििििललललककककाााा:::: 1111....1111 ििििवववव%%%%ततुुततुु (cid:7)(cid:7)(cid:7)(cid:7)<<ेे<<ेे ककककोोोो आआआआबबबब66ंं66ंं टटटटतततत ककककैैैैिििि::::टटटटवववव ककककोोोोययययललललाााा (cid:2)(cid:2)(cid:2)(cid:2)लल लल ॉॉॉॉकककक;;;; ककककेेेे आआआआबबबबटटंंटटंं नननन ससससबबंंबबंं धधंंधधंं ीीीी ििििववववववववररररणणणण ििििवववव%%%%ततुुततुु ककककंंंंपपपपननननीीीी ककककोोोोययययललललाााा (cid:2)(cid:2)(cid:2)(cid:2)लल लल ॉॉॉॉकककक भभभभ--ूू--ूू गगगगभभभभ>>>>यययय आआआआररररिििि(cid:7)(cid:7)(cid:7)(cid:7)तततत भभभभडडंंडडंं ाााारररर ((((ममममीीीी6666((((कककक टटटटनननन)))) ससससीीीीपपपपीीीीएएएएससससयययय ूू ूू 11114444 7777777755552222 रररराााा????यय यय (cid:7)(cid:7)(cid:7)(cid:7)<<ेे<<ेे ककककोोोो ििििवववव%%%%ततततुुुु 44445555 11113333555566666666....88888888 ककककंंंंपपपपििििननननययययाााा ंं ंं ययययएएूूएएूू ममममपपपपीीीीपपपपीीीी 11110000 4444555522220000....99991111 ििििननननजजजजीीीी (cid:7)(cid:7)(cid:7)(cid:7)<<ेे<<ेे 11119999 3333777755554444....00003333 जजजजोोोोड़ड़ड़ड़ 88888888 22229999555599993333....22222222 45.15 िमिलयन मी(cid:8)<क टन *ित वष(cid:23) उ(cid:12)प ादन Oमता वाले 16 कोयला 7ल ॉक *चालनरत ह।L 36 कोयला 7ल ॉक] (आरिOत भंडार 12659 मी(cid:8)<क टन) के िलए खनन योजना अनुमो^दत कर दी गई ह।ै 12वz पंचवषVय योजना के िलए Oमता अिभवृिD के लsय ] को *ा?त करने के िलए कैि?टव खान वाले कोयला 7ल ॉक] का *ाथिमकता के आधार पर िवकास ^कया जाना चािहए। 1111....2222....4444 ननननईईईई जजजजलललल ििििवववव%%%%ततततुुुु ननननीीीीिििितततत जल िव0तु का (cid:12)व (cid:8)रत िवकास सुिनिgत करने के उtUे य से सरकार rारा एक नई जल िव0ुत नीित क, घोषणा क, गई ह।ै इस नीित के अनुसार राKय सरकार] को िनजी Oे-] के िलए संभािवत (cid:29)थ ल आबं(cid:8)टत (अिधिन(cid:21)णत) करन े के िलए एक पारदशV *^(cid:24)या अपनानी होगी। संबंिधत िनजी िवकासकता(cid:23) को मौजूदा *^(cid:24)या जैसे डीपीआर तैयार करना और अ2य सांिविधक (cid:29)व ीकृितयां *ा?त करना और ^फर प(cid:8)रयोजना के िलए टै(cid:8)रफ के िनधा(cid:23)रण हते ु उपयु!त िनयामक से पहल करना आ^द को अपनाना होगा। प(cid:8)रयोजनाj क, (cid:29)थ ापना म(cid:11) होने वाले िवलंब से िव0ुत क, Wय ापा(cid:8)रक िब(cid:24), कम होगी। (cid:29)थ ानीय Oे- िवकास िनिध और प(cid:8)रयोजना से *भािवत प(cid:8)रवार] को *ो(cid:12)स ाहन दने े के िलए भी *ावधान ^कए गए ह।L नई जल िव0तु नीित िवकासकता (cid:23) को िब(cid:24), योaय िव0ुत के अिधकतम 40% तक क, Wय ापा(cid:8)रक िब(cid:24), के माnय म से अपनी अित(cid:8)र!त लागत] क, वसूली करन े म(cid:11) सOम बनाती ह।ै इसके अलावा क(cid:2)य ाण योजनाj अित(cid:8)र!त अवसंरचना और सामुदाियक सुिवधाj के सजृ न हते ु (cid:29)थ ानीय Oे- िवकास के िलए प(cid:8)रयोजना से 1% मुJत िव0ुत आबं(cid:8)टत क, जानी ह।ै राKय सरकार] से भी अपेOा क, जाती ह ै ^क वे भी (cid:29)थ ानीय Oे- िवकास के िलए अपनी 12% मुJत िबजली से उतनी ही अथात(cid:23) 1% िव0ुत का योगदान दगे ी।¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 13 1111....2222....5555 पपपपााााररररेेेेषषषषणणणण (cid:7)(cid:7)(cid:7)(cid:7)<<ेे<<ेे मममम @@ @@ििििननननजजजजीीीी (cid:7)(cid:7)(cid:7)(cid:7)<<ेे<<ेे ककककAAAA !!!!ििििततततभभभभााााििििगगगगतततताााा पावरि.ड के साथ संयु!त उ0म और *ितयोगी बोली *^(cid:24)या के माnय म से पारेषण *णाली *दाता (टीएसपी) के चयन के ज(cid:8)रए िनजी Oे- क, *ितभािगता के िलए अतं र राKय पारेषण Oे- खोला गया। पारेषण का काय (cid:23) एक लाइस(cid:11)स पर आधा(cid:8)रत कायक(cid:23) लाप ह ै और पीजीसीआईएल क(cid:11)3ीय Oे- क, एक पारेषण कंपनी होने के कारण मानद लाइस(cid:11)सधारक के iप म(cid:11) काय(cid:23) करता ह।ै इसिलए संयु!त उ0म (जेवी) कंपिनय] को पारेषण लाइस(cid:11)स क, (cid:29)व ीकृित के िलए क(cid:11)3ीय िव0ुत िनयामक आयोग से पहल करनी पड़ी थी। िवशेष <ांसिमशन प(cid:8)रयोजनाj के िवकास हते ु टोर(cid:11)ट पावरि.ड कंपनी िल., जेपी पावरि.ड िल., पारबती कोलडाम <ासं िमशन कंपनी िल., ती(cid:29)त ा वैली पावर <ांसिमशन िल. और नाथ(cid:23) ई(cid:29)ट <ांसिमशन कंपनी िलिमटेड को लाइस(cid:11)स (cid:29)व ीकृत ^कए गए। त(cid:12)प Uच ात िव0तु मं-ालय म(cid:11) पारेषण प(cid:8)रयोजनाj के िवकास म(cid:11) *ित(cid:29)प धा (cid:23) बढ़ाने के िलए ^दशािनदशX तथा पारेषण सेवाj के िलए टै(cid:8)रफ आधा(cid:8)रत बोली *^(cid:24)या ^दशािनदशX के साथ साथ बाजारी माग(cid:23) के ज(cid:8)रए पारेषण सेवाj क, खरीद के िलए मानक बोली द(cid:29)त ावेज जारी ^कए। *ितयोगी बोली *^(cid:24)या के िलए पारेषण प(cid:8)रयोजनाj का चयन करते समय बोली *^(cid:24)या को पूरा करने के िलए लगभग एक वष(cid:23) के आगामी समय (लीड टाइम) को भी nय ान म(cid:11) रखा जाए। आरएफपी चरण से पहले सभी संभावनाए ं तलाश क, जानी चािहए !य ]^क टै(cid:8)रफ बोिलयां आमंि-त करनके े बाद उनम(cid:11) कोई भी संशोधन करना संभव नहz होता ह।ै टै(cid:8)रफ आधा(cid:8)रत बोली *^(cid:24)या के ज(cid:8)रए चयिनत पारेषण सेवा *दाता बाद म(cid:11) कंपनी का अिध.हण करता ह ै और ^फर उस े पारेषण लाइस(cid:11)स और आयोग rारा बाजार से पता लगाए गए टै(cid:8)रफ क, (cid:29)व ीकृित लेनी होती ह ै और इसी बीच उसे िव(cid:12)त ीय समापन भी करना होता ह।ै िव0ुत मं-ालय ने *ितयोगी बोली *^(cid:24)या के ज(cid:8)रए काया(cid:23)ि2वत क, जाने वाली प(cid:8)रयोजनाj क, पहचान और बोली *^(cid:24)या सम2व यक को माग(cid:23)दश(cid:23)न *दान करन े के िलए सीईआरसी के सद(cid:29)य क, अnय Oता म(cid:11) एक उGच अिधकार *ा?त सिमित ग(cid:8)ठत क, ह।ै िव0तु मं-ालय ने आरईसी और पीएफसी को बोली *^(cid:24)या सम2व यक िनयु!त ^कया ह।ै दस अंतर – राKय पारेषण प(cid:8)रयोजनाj का वत(cid:23)मान म(cid:11) काया(cid:23)2व यन *ितयोगी बोली *^(cid:24)या के ज(cid:8)रए ^कया जा रहा ह।ै उनम(cid:11) से दो प(cid:8)रयोजनाए ं पावरि.ड को स{पी गई ह L और शेष बची प(cid:8)रयोजनाए ं िनजी Oे- क, कंपिनय] rारा कायाि(cid:23) 2वत क, जा रही ह।ै 1111....2222....6666 जजजजललललववववाााायययय ुु ुु पपपप6666ररररववववततततननBBननBB ककककेेेे ििििललललएएएए रररराााा####(( (( ीीीीयययय ककककाााायययय BB BBययययोोोोजजजजननननाााा जलवायु प(cid:8)रवत(cid:23)न पर रा`< ीय काय(cid:23) योजना (एनएपीसीसी) का शुभारंभ *धानमं-ी rारा जून, 2008 म(cid:11) ^कया गया। एनएपीसीसी म(cid:11) (cid:29)वG छ *ौ0ोिग^कय] का *योग करते mए (cid:29)थ ायी िवकास को बढ़ावा दने े क, अपेOा क, गई ह।ै इस योजना का उtUे य भारत के .ीन हाउस गैस उ(cid:12)स ज(cid:23)न को िवकिसत दशे ] क, तुलना म(cid:11) कम करना ह।ै इस योजना का काया(cid:23)2व यन 8 िमशन] के ज(cid:8)रए ^कया जाएगा जो जलवायु प(cid:8)रवत(cid:23)न के संदभ(cid:23) म(cid:11) मह(cid:12)व पूण(cid:23) लsय ] को हािसल करने के िलए बmआयामी, दीघ(cid:23)कािलक और एक,कृत रणनी ितय] का *ितिनिध(cid:12)व कर(cid:11)गे। उपयु(cid:23)!त लsय यूएनएफसीसी म(cid:11) उि(cid:2)लिखत समान परंतु िभ2न िज:म ेदा(cid:8)रयां और सगं त Oमताj के िसDातं पर आधा(cid:8)रत एक *भावी, सहयोगा(cid:12)म क और सम. वैि(cid:129)क पहल शुi करने से संबंिधत ह।ै य^द िवकिसत दशे यूएनएफसीसी के अतं ग(cid:23)त अपनी *ितबDताj को पूरा करत े ह L और िवकासशील दशे ] को अित(cid:8)र!त िव(cid:12)त ीय संसाधन तथा जलवायु क, दिृ o स े अनुकूल *ौ0ोिग^कयां ह(cid:29)त ातं (cid:8)रत करते ह L तो भारत के *यास सफल ह]गे। एनएपीसीसी न े िन:न िलिखत आठ रा`< ीय िमशन] क, पहचान क, ह ै :14 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] • रा`< ीय सौर िमशन • उ2न त ऊजा(cid:23) दOता के िलए रा`< ीय िमशन • (cid:29)थ ायी पया(cid:23)वास पर (cid:29)थ ायी िमशन • रा`< ीय जल िमशन • िहमालयी पा(cid:8)रि(cid:29)थितक, तं- को बचाए रखने के िलए रा`< ीय िमशन • ''ह(cid:8)रत भारत’’ के िलए रा`< ीय िमशन • (cid:29)थ ायी कृिष के िलए रा`< ीय िमशन • जलवायु प(cid:8)रवत(cid:23)न के िलए रणनीितक 'ान पर रा`< ीय िमशन जजजजववववााााहहहहररररललललाााालललल ननननहहहहेेेे 0000 रररराााा####(( (( ीीीीयययय ससससौौौौरररर ििििममममशशशशनननन ---- ससससौौौौरररर भभभभााााररररतततत ििििननननममममााााBणBणBणBण ककककAAAA 1111ददददशशशशाााा मममम @@ @@ रा`< ीय सौर िमशन भारत सरकार क, एक मह(cid:12)व पूण(cid:23) पहल ह ै और राKय सरकार] को भारत क, ऊजा(cid:23) सरु Oा संबंधी चुनौती का सामना करते समय पा(cid:8)रि(cid:29)थितक,य दिृ o से (cid:29)थ ायी वृिD को बढ़ावा दने ा चािहए। यह जलवाय ु प(cid:8)रवत(cid:23)न क, चनु ौती का सामना करने के िलए वैि(cid:129)क (cid:29)त र पर ^कए जा रह े *यास] म(cid:11) भारत के एक बड़ े योगदान के iप म(cid:11) िसD होगा। रा`< ीय सौर िमशन का उtUे य सौर ऊजा(cid:23) के Oे- म(cid:11) वैि(cid:129)क (cid:29)त र पर भारत को अ.णी दशे के iप म(cid:11) (cid:29)थ ािपत करना ह,ै इसके िलए यथासंभव संपूण(cid:23) दशे म(cid:11) इसे लागू करने के िलए नीितगत शत‚ तैयार क, गई ह।L इस िमशन के अंतग(cid:23)त तीन चरण वाली पहल क, जानी थी, ये तीन चरण (cid:24)मश: 11वz पंचवषVय योजना क, शेष अविध और 12वz पंचवषVय योजना का पहला वष(cid:23) (2012-13 तक) चरण-1 के iप म(cid:11), 12वz पंचवषVय योजना के शेष चार वष (cid:23) (2013-17) चरण-2 के iप म(cid:11) और 13वz पंचवषVय योजना (2017-22) चरण-3 के iप म (cid:11) िनधा(cid:23)(cid:8)रत ^कए गए ह।L *(cid:12)य ेक पंचवषVय योजना क, समािƒ पर और 12वz तथा 13वz पंचवषVय योजनाj क, मnय ाविध म(cid:11) इस ^दशा म(cid:11) क, गई *गित का मू(cid:2)य ांकन ^कया जाएगा और घरेलू तथा विै (cid:129)क दोन] (cid:29)त र] पर उभरत े mए लागत और *ौ0ोिगक,य „झान] के आधार पर आगामी चरण] के िलए Oमता और लs य] क, समीOा क, जाएगी। य^द अपेिOत (cid:29)त र तक लागत कम नहz होती ह ै अथवा यह अनुमान क, तुलना म(cid:11) अिधक तजे ी स े बढ़ती ह ै तो यह *यास ^कया जाएगा ^क सरकार को अिधक सि7सडी न दने ी पड़।े िमशन का िनतांत आवUय क उtUे य दशे म(cid:11) के23 ीकृत और िवके23 ीकृत दोन] (cid:29)त र] पर सौर *ौ0ोिगक, को बढ़ावा दने े के िलए अनुकूल वातावरण तैयार करना ह।ै *थम चरण (2013 तक) म(cid:11) सोलर थम(cid:23)ल के Oे- म(cid:11) लो हQL गग तकनीक को अपनाने पर जोर ^दया जाएगा; वािणिKयक ऊजा(cid:23) के अिभगम के िबना जनसमुदाय को सेवा *दान करने के िलए ऑफ-ि.ड *णािलय] को बढ़ावा दने े और ि.ड आधा(cid:8)रत *णािलय] क, अपेिOत Oमता अिभवृिD पर भी जोर ^दया जाएगा। दसू रे चरण म(cid:11) आरंिभक वषF के अनुभव को nय ान म(cid:11) रखत े mए दशे म(cid:11) उ2न त और *ित(cid:29)प धा(cid:23)(cid:12)म क सौर ऊजा (cid:23) इ(cid:29)त ेमाल के िलए अनुकूल ि(cid:29)थितया ं िन(cid:21)मत करने हते ु तेजी स े Oमता बढ़ाई जाएगी। इइइइसससस उउउउFFFFेGेGेGेGयय यय ककककोोोो !!!!ाााा::::तत तत ककककररररनननन ेे ेेककककेेेे ििििललललएएएए ििििममममशशशशनननन ककककेेेे ललललHHHHयय यय ििििनननन(cid:24)(cid:24)(cid:24)(cid:24)नननन ााााननननससुुससुु ाााारररर हहहह II II:::: • 2022 तक 20,000 मेगावाट सौर िव0तु के िनयोजन हते ु एक समथक(cid:23) ारी नीितगत ढांचा सृिजत करना • 2013 तक तीन वष(cid:23) के भीतर 1000 मेगावाट Oमता वाला ि.ड-संबD सौर िव0तु उ(cid:12)प ादन बढ़ाना; ऐसी िव0ुत कंपिनय] िज2ह (cid:11) *ाथिमकता के आधार पर टै(cid:8)रफ म(cid:11) छूट *दान क, जाती ह,ै rारा नवीकरणीय खरीद¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 15 बाnय ता के अिनवाय(cid:23) इ(cid:29)त ेमाल के ज(cid:8)रए 2017 तक 3000 मेगावाट क, अित(cid:8)र!त Oमता (cid:29)थ ािपत करना। यह Oमता दोगुनी से भी अिधक हो सकती ह ै – बढ़े mए और बेहतर अंतरा(cid:23)`< ीय िव(cid:12)त ीय सहायता तथा *ौ0ोिगक, ह(cid:29)त ांतरण के आधार पर यह 2017 तक 10,000 मेगावाट क, (cid:29)थ ािपत Oमता तक या उसस े अिधक भी हो सकती ह।ै वष(cid:23) 2022 के िलए 20,000 मेगावाट अथवा उससे अिधक का मह(cid:12)व ाकाOं ी लsय पहले दो चरण] के दौरान *ा?त ''सीख/अनुभव’’ पर आधा(cid:8)रत होगा, जो य^द सफल रहते ह L तो इस बात को नकारा नहz जा सकता ^क भिव`य म(cid:11) सौर ऊजा(cid:23) के िलए भी ि.ड- *ितयोगी ि(cid:29)थितया ं अवUय िन(cid:21)मत ह]गी। अंतरा(cid:23)`< ीय िव(cid:12)त ीय सहायता और *ौ0ोिगक, क, उपल7ध के आधार पर इस संिधकाल/प(cid:8)रवत(cid:23)न के दौर को उपयु!त ढंग से बढ़ाया जा सकता ह।ै • सौर िविनमा(cid:23)ण Oमता, िवशेष iप से सोलर थम(cid:23)ल हते ु (cid:29)थ ानीय उ(cid:12)प ादन और बाजार म(cid:11) अ.णी रहने के िलए अनुकूल ि(cid:29)थितया ं िन(cid:21)मत करना। • 2017 तक 10,000 मेगावाट और 2022 तक 20,000 मेगावाट के लsय को *ा?त करने के िलए ऑफ ि.ड अनु*योग] के िलए काय(cid:23)(cid:24)म] को बढ़ावा दने ा। • 2017 तक 15 िमिलयन और 2022 तक 20 िमिलयन वग(cid:23) मीटर सोलर थम(cid:23)ल सं.हण Oे- का लsय हािसल करना। • 2022 तक .ामीण Oे-] के िलए 20 िमिलयन सोलर लाइIटग *णािलय] का िनयोजन करना। 1111333300000000 ममममगगेेगगेे ााााववववााााटटटट ककककेेेे !!!!थथथथमममम चचचचररररणणणण ककककेेेे ककककााााययययाााा44BB44BB वव वव ययययनननन हहहहततेेततेे ुु ुुररररणणणणननननीीीीिििितततत • अनावं(cid:8)टत िव0ुत के साथ 1000 मेगावाट क, बंडQलग • राKय ] को iफ टॉप क, *ितपू(cid:21)त 1111....2222....7777 11111111ववववKKKK ययययोोोोजजजजननननाााा ((((2222000000007777----11112222)))) ककककेेेे ददददौौौौरररराााानननन पपपपननुुननुु गगगग66BB66BB ठठठठतततत MMMMवव वव 6666ररररतततत ििििवववव%%%%ततुुततुु ििििववववककककाााासससस औऔऔऔरररर ससससधधुुधधुु ाााारररर ककककाााायययय88BB88BB मममम ((((आआआआरररर---- एएएएपपपपीीीीडडडडीीीीआआआआररररपपपपीीीी)))) भारत सरकार ने एक क(cid:11)3ीय Oे- योजना के iप म (cid:11) संशोिधत Qनबंधन और शतF के साथ 11वz पंचवषVय योजना के दौरान पुनग(cid:23)(cid:8)ठत (cid:12)व (cid:8)रत िव0ुत िवकास और सुधार काय(cid:23)(cid:24)म (आर-एपीडीआरपी) के काया(cid:23)2व यन हते ु मंजरू ी *दान क, ह।ै इस काय(cid:24)(cid:23) म का *मुख उtUे य (cid:29)थ ायी iप से हािन को कम करन े के संदभ(cid:23) म(cid:11) वा(cid:29) तिवक *दश(cid:23)नीय िन`प ादन करना ह।ै पुनग(cid:23)(cid:8)ठत एपीडीआरपी काय(cid:23)(cid:24)म को 51,577 करोड़ „पए के प(cid:8)रWय य के साथ अनुमो^दत ^कया गया। इसके अंतग(cid:23)त 30,000 (िवशषे Aेणी के अंतग(cid:23)त आने वाल े राKय ] के मामले म(cid:11) 10,000) स े अिधक जनसं(cid:127)य ा वाल े शहरी Oे-], क(cid:29)ब ] और शहर] को शािमल ^कए जाने का *(cid:29)त ाव ह।ै इसके अलावा कुछ ऐसे .ामीण Oे- जहा ं उGच लोड घन(cid:12)व के साथ साथ मह(cid:12)व पूण(cid:23) लोड ह,ै म(cid:11) घरेलू और औ0ोिगक फ,डर] स े कृिष फ,डर] को अलग करन े का काय(cid:23) और उGच वो(cid:2)ट ेज िवतरण *णाली (11 केवी) का काय(cid:23) भी शुi ^कया जाएगा। इसके अलावा ऐसे क(cid:29)ब ]/Oे-], िजनके िलए 10वz पंचवषVय योजना के दौरान प(cid:8)रयोजनाए ं (cid:29)व ीकृत क, गई हL, उनके िलए भी आरएपीडीआरपी के अंतग(cid:23)त 11वz योजना के िलए केवल तभी िवचार ^कया जाएगा जब या तो पहल े स े (cid:29)व ीकृत प(cid:8)रयोजनाए ं पूरी हो गइ(cid:23) ह L अथवा उनको िनधा(cid:23)(cid:8)रत समयाविध के पहले बंद कर ^दया गया हो।16 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] इस योजना के अंतग(cid:23)त प(cid:8)रयोजनाए ं दो भाग] म(cid:11) शुi क, जाएगं ी। भाग-क म(cid:11) ऊजा(cid:23) लेखांकन/लेखाकरण हते ु आधार लाइन डटे ा और आईटी अनु*योग] तथा आईटी आधा(cid:8)रत उपभो!त ा सेवा के23 ] क, (cid:29) थापना हते ु प(cid:8)रयोजनाए ं शािमल ह]गी और भाग-ख म(cid:11) िनयिमत िवतरण सुदढ़ृ ीकरण प(cid:8)रयोजनाए ं शािमल ह]गी। 11वz पंचवषVय योजना म(cid:11) आरएपीडीआरपी के िलए नोडल एज(cid:11)सी के iप म(cid:11) पावर फाइन(cid:11)स कॉपSरेशन (पीएफसी) इस काय(cid:23)(cid:24)म के सुचा„ iप से काया(cid:23)2व यन के िलए आवUय क सहायता *दान करेगा। 1111....2222....8888 ररररााााजजजजीीीीवववव गगगगााााधधंंधधंं ीीीी NNNNााााममममीीीीणणणण ििििवववव%%%%ततुुततुु ीीीीककककररररणणणण ययययोोोोजजजजननननाााा ((((आआआआररररजजजजीीीीजजजजीीीीववववीीीीववववााााईईईई)))) के23 सरकार न े .ामीण िव0ुत अवसरं चना और घरेल ू िव0ुतीकरण के िलए 4 अ*ैल, 2005 को राजीव गांधी .ामीण िव0ुतीकरण योजना का शुभारंभ ^कया। यह योजना आगामी पांच वष(cid:23) म(cid:11) सभी प(cid:8)रवार] को िव0तु अिभगम सुलभ करान े के िलए रा`< ीय 2य ूनतम साझा काय(cid:23)(cid:24)म (एनसीएमपी) के लsय ] को *ा?त करन े के िलए शुi क, गई। इस योजना का उtUे य 1,25000 िव0तु रिहत गाव] और पुरव] का िव0ुतीकरण करना और 7.8 करोड़ घर] म(cid:11) िव0ुत कने!श न उपल7ध कराना ह।ै योजना क, अनुमािनत लागत (11वz पंचवषVय योजना सिहत) लगभग 16,0000 करोड़ „पए थी और 10वz पंचवषVय योजना अविध के दौरान चरण-1 म(cid:11) पूंजीगत सि7सडी के िलए 5000 करोड़ „पए क, रािश िनधा(cid:23)(cid:8)रत क, गई थी। इस योजना के अंतग(cid:23)त 90% पूंजीगत सि7सडी िन:न िलिखत के *ावधान हते ु प(cid:8)रयोजना क, संपूण(cid:23) लागत के िलए *दान क, जाएगी : • *(cid:12)य के 7ल ाक म(cid:11) कम से कम 33/11 केवी (अथवा 66/11 केवी) वाली .ामीण िव0ुत अवसंरचना बैकबोन (आरईडीबी) • *(cid:12)य के गांव/पया(cid:23)वास म(cid:11) कम से कम एक िवतरण <ासं फाम(cid:23)र के साथ .ामीण िव0ुतीकरण अवसरं चना (वीईआई) • जहां ि.ड आपू(cid:21)त या तो सभं व नहz ह ै अथवा लागत *भावी नहz ह,ै वहां िवके23 ीकृत िवत(cid:8)रत उ(cid:12)प ादन (डीडीजी) *णाली 11वz योजना म(cid:11) आरजीजीवीवाई के अंतग(cid:23)त िवके23 ीकृत िवत(cid:8)रत उ(cid:12)प ादन (डीडीजी) के ज(cid:8)रए .ामीण िव0ुतीकरण के िलए ^दशािनदशX अनुमो^दत कर ^दए गए ह L और उ2ह (cid:11) 12 जनवरी, 2009 के काया(cid:23)लय 'ापन सं(cid:127)य ा 44/1/2007-आरई के ज(cid:8)रए प(cid:8)रचािलत ^कया गया ह।ै भारत सरकार न े सभी प(cid:8)रवार] को िव0ुत उपल7ध करान,े लगभग 1.15 लाख िव0ुत रिहत गांव] के िव0ुतीकरण और 2012 तक 2.34 करोड़ बीपीएल प(cid:8)रवार] को िव0ुत के कने!श न मुहयै ा करान े के लsय को *ा?त करने के िलए 28,000 करोड़ „पए क, पूंजीगत सि7सडी के साथ 11वz पंचवषVय योजना म(cid:11) इस योजना को जारी रखने के िलए अनुमोदन *दान ^कया ह।ै इसके अलावा आरजीजीवीवाई 12वz पंचवषVय योजना के दौरान भी जारी रहगे ी। 1111....2222....9999 (cid:12)(cid:12)(cid:12)(cid:12)वव वव ददददशशेेशशेे ीीीी उउउउपपपप(cid:12)(cid:12)(cid:12)(cid:12)कक कक रररर ििििववववििििननननममममााााBणBणBणBण (cid:7)(cid:7)(cid:7)(cid:7)ममममतततताााा ििििवववव(cid:12)(cid:12)(cid:12)(cid:12)तत तत ाााारररर 11वz पंचवषVय योजना के दौरान Oमता अिभवृिD क, आवUय कता को पूरा करन े और उसके बाद भी मौजूदा िविनमा(cid:23)ताj क, िविनमा(cid:23)ण Oमता बढ़ाने तथा नए व(cid:11)डर] को *ो(cid:12)स ािहत करने के िलए दशे म(cid:11) मु(cid:127) य ?ल ांट उप(cid:29)क र िविनमा(cid:23)ण Oमता उपयु!त iप से बढ़ान े के िलए हर सभं व *यास ^कए गए ह।L (cid:29)व दशे ी िविनमा(cid:23)ण सुिवधाj क, (cid:29)थ ापना के िलए भारत सरकार से *ो(cid:12)स ाहन के आधार पर बmत से नए िविनमात(cid:23) ा आगे आए ह L और वे वा`प¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 17 जनरेटर तथा टबा(cid:23)इन जनरेटर के िलए िविनमा(cid:23)ण सुिवधाए ं (cid:29)थ ािपत कर रह े ह।L इन नए व(cid:11)डर] म(cid:11) िन:न िलिखत व(cid:11)डर शािमल ह L : 1. एल ए@ड टी-एमएचआई 2. तोशीबा-जेएसड7(cid:2) य ू 3. ए(cid:2)स टम-भारत फोज (cid:23) 4. गैमन – अंसा(cid:2)ड ो 5. बीजीआर-िहताची 6. डूसन 7. थमX!स -बैबकॉक 8. सेथर वेसल-(cid:8)रले पावर उपयु(cid:23)!त सहयोिगय] से यह िन`क ष(cid:23) िनकाला जा सकता ह ै ^क दशे म(cid:11) मेन ?ल ांट उप(cid:29) कर] के िविनमा(cid:23)ण के िलए पया(cid:23)?त Oमता मौजूद ह ै । क(cid:11)िव*ा ने सुपर ^(cid:24)टीकल Wय ायलर और टबा(cid:23)इन जनरेटर] के पू(cid:21)तकता(cid:23)j क, पूव(cid:23)-अहत(cid:23) ा संबंधी आवUय कताj क, पहले ही समीOा कर ली ह ै िजससे ^क नई कंपिनय] के *वेश को सकु र बनाया जा सके और क(cid:11)3 तथा राKय Oे- क, िव0ुत कंपिनय] rारा अपनाए जाने के िलए इनक, िसफा(cid:8)राश क, ह ै । (cid:29)व दशे ी (cid:29)त र पर िविनमा(cid:23)ण को बढ़ावा दने े और सुपर ^(cid:24)(cid:8)टकल *ौ0ोिगक, के ह(cid:29)त ांतरण के उtUे य से एनटीपीसी और डीवीसी क, प(cid:8)रयोजनाj के िलए सुपर ^(cid:24)(cid:8)टकल *ौ0ोिगक, वाली 660 मेगावाट क, 11 यिू नट] क, एक साथ िनिवदा *^(cid:24)या शुi क, गई ह ै िजसम(cid:11) (cid:29)व दशे ी (cid:29)त र पर िविनमा(cid:23)ण चरण को अिनवाय(cid:23) बनाया गया ह।ै पावर ?ल ांट] के िलए बकाया ?ल ांट उप(cid:29)क र] क, आवUय कता क, का भी एक मू(cid:2) यांकन ^कया गया ह ै और मौजूदा व(cid:11)डर] क, िविनमा(cid:23)ण Oमता बढ़ाने के साथ साथ नए व(cid:11)डर] को *ो(cid:12)स ािहत करने के िलए भी *यास ^कए जा रह े ह।L बीओपी खंड म(cid:11) िनवेश आकृ`ट करन े के उtUे य से िव0ुत Oे- के िलए बीओपी क, दीघ(cid:23)कालीन आवUय कता के बारे म(cid:11) उ0ोग जगत को संवेदनशील बनाना िनतांत आवUय क ह।ै िव0ुत मं-ालय और क(cid:11)3ीय िव0ुत *ािधकरण न े पहले ही बीओपी क, आवUय कता के बारे म(cid:11) उ0ोग जगत को संवेदनशील बनान े के िलए सीआईआई के सहयोग स े एक पहल शुi कर दी ह।ै बीओपी कोई उGच *ौ0ोिगक, Oे- नहz ह ै और य^द ^कसी व(cid:11)डर को अ2य अवसंरचना प(cid:8)रयोजनाj के ^(cid:24)या2व यन का अनुभव ह ै तो वह बीओपी ^(cid:24)या2व यन Oमताए ं िवकिसत कर सकता ह।ै इस बात पर इसिलए िवचार ^कया गया ह ै ^क िजससे ^क मौजूदा बीओपी िनमा(cid:23)ताj पर अ(cid:12)य िधक भार न पड़।े क(cid:11)3ीय िव0तु *ािधकरण ने बीओपी व(cid:11)डर] क, पूव(cid:23) अहत(cid:23) ा संबंधी आवUय कताj क, समीOा पहल े ही कर ली ह ै और क(cid:11)3ीय िव0ुत *ािधकरण rारा िविभ2न बीओपी पैकेज] के िलए पूव(cid:23) अहत(cid:23) ा (cid:8)रपोट(cid:23) को अंितम iप ^दया गया ह।ै इसके िलए पणधारक] के साथ भी परामश(cid:23) ^कया गया ह।ै क(cid:11)िव*ा क, िसफा(cid:8)रश] को राKय तथा क(cid:11)3ीय Oे- क, िव0ुत कंपिनय] rारा अपनाए जान े के िलए उ2ह (cid:11) अ.ेिषत ^कया गया ह।ै18 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 1111....2222....11110000 ऊऊऊऊजजजजाााा BB BBककककााााययययककBBककBB ुुुुशशशशललललतततताााा (cid:2)(cid:2)(cid:2)(cid:2)यय यय ररूूररूू ोोोो ((((बबबबीीीीईईईईईईईई)))) ////ाााारररराााा ममममाााागगंंगगंं पपपप(cid:7)(cid:7)(cid:7)(cid:7) !!!!बबबबधधंंधधंं नननन ससससबबंंबबंं धधंंधधंं ीीीी पपपपहहहहलललल इस तwय को (cid:29)व ीकार करते mए ^क ऊजा(cid:23) का दOतापूव(cid:23)क उपयोग और इसका संरOण मांग और पू(cid:21)त के बीच अंतर समा?त करने के िलए सबसे अिधक लागत *भावी िवक(cid:2)प ह,ै भारत सरकार ने ऊजा (cid:23) संरOण (ईसी) अिधिनयम, 2001 का अिधिनयमन ^कया ह ै और ऊजा(cid:23) काय(cid:23)कुशलता 7य ूरो (बीईई) क, (cid:29)थ ापना क, ह।ै अिधिनयम म(cid:11) यह *ावधान ^कया गया ह ै ^क दशे म(cid:11) ऊजा(cid:23) क, दिृ o से कुशल सेवाj के िलए सं(cid:29)थ ागत और सुदढ़ृ *दायगी तं- (cid:29)थ ािपत ^कया जाए और यह भी *ावधान ^कया गया ह ै ^क िविभ2न िनकाय]/संगठन] के बीच िनतातं आवUय क सम2व य (cid:29)थ ािपत ^कया जाए। ऊजा (cid:23) काय(cid:23)कुशलता 7य ूरो नीितगत काय(cid:23)(cid:24)म] के काया(cid:23)2व यन और ऊजा (cid:23) संरOण संबंधी काय(cid:23)कलाप] के काया(cid:23)2व यन हते ु सम2व य (cid:29)थ ािपत करने के िलए िज:म ेदार होगा। ऊजा(cid:23) काय(cid:23)कुशलता 7य ूरो का िमशन भारतीय अथ(cid:23)Wय व(cid:29)थ ा क, ऊजा(cid:23) िनभ(cid:23)रता को घटान े के *ाथिमक उtUे य के साथ ऊजा(cid:23) संरOण अिधिनयम के संपूण(cid:23) ढांचे के भीतर (cid:29)व -िविनयिमत और बाजार िसDातं ] पर आधा(cid:8)रत नीित और रणनीितयां िवकिसत करना ह।ै ििििवववव%%%%ततुुततुु ससससररंंररंं (cid:7)(cid:7)(cid:7)(cid:7)णणणण अअअअििििधधधधििििननननययययमममम ककककेेेे अअअअििििननननववववाााायययय BB BB!!!!ााााववववधधधधाााानननन • ऊजा(cid:23) Wय वसाियय] क, ऊजा (cid:23) *बंधन और ऊजा(cid:23) लेखांकन Oमताj का सुदढ़ृ ीकरण • ऊजा(cid:23) लेखाकार] का अिध*माणन • िव िभ2न औ0ोिगक Oे-] के िलए शतF का िनधा(cid:23)रण • नािमत उपभो!त ाj rारा अिनवाय(cid:23) ऊजा(cid:23) लेखापरीOाए ं संचािलत करना। • राKय rारा नािमत एज(cid:11)िसय] क, अिधसूचना • अिधसूिचत ऊजा(cid:23) खपत वाले उप(cid:29)क र और उपकरण] के िलए मानक एवं ले बQलग • 500 ^कलोवाट अथवा उसस े अिधक संबD लोड वाली नई वािणिKयक िबQ(cid:2)डग] के िलए ऊजा(cid:23) संरOण िबQ(cid:2)डग कोड ककककाााायययय88BB88BB मममम औऔऔऔरररर उउउउपपपपाााायययय ऊजा(cid:23) काय(cid:23)कुशलता 7य ूरो (बीईई) ने मह(cid:12)व पूण(cid:23) Oे-] क, पहले ही पहचान कर ली ह ै और एक िव(cid:29)त ृत योजना तैयार क, ह,ै िजसम(cid:11) ऊजा(cid:23) के दOतापूव(cid:23)क *योग और इसके संरOण को बढ़ावा दने े के िलए प(cid:8)रयोजनाj और काय(cid:23)(cid:24)म] के काया(cid:23)2व यन हते ु 7य ूरो rारा ^कए जाने वाले संबD काय(cid:23)कलाप] क, सूची दी गई ह।ै इस काय(cid:23) योजना का शुभारंभ नई ^द(cid:2)ल ी म (cid:11) आयोिजत नई सह(cid:29)- ाि7द म(cid:11) ऊजा(cid:23) संरOण के िलए रणनीितया ं िवषयक अंतरा(cid:23)`< ीय स:म ेलन के दौरान 23 अग(cid:29)त , 2002 को माननीय *धानमं-ी rारा क, गई। काय(cid:23) योजना म(cid:11) अ2य बात] के साथ िन:न िलिखत बात (cid:11) शािमल ह L : • ऊजा(cid:23) संरOण के िलए भारतीय औ0ोिगक काय(cid:24)(cid:23) म • मांग पO *बंधन • मानक और ल बे Qलग काय(cid:23)(cid:24)म • िबQ(cid:2)डग और (cid:29)थ ापनाj म(cid:11) ऊजा(cid:23) दOता • ऊजा(cid:23) संरOण िबQ(cid:2)डग कोड¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 19 • Wय ावसाियक *माणन और अिध*माणन • िनयम पु(cid:29)त क (मै2य ुअल) और आचार संिहता (कोड) • ऊजा(cid:23) दOता नीितगत अनुसधं ान काय(cid:23)(cid:24)म • ऊजा(cid:23) सेवाj के िलए *दायगी तं- • (cid:29)क ूल िशOा आ^द 1111....2222....11111111 ममममााााननननवववव ससससससंंससंं ााााधधधधनननन ििििववववककककाााासससस –––– 1111ककककससससीीीी आआआआईईईईटटटटीीीीआआआआईईईई ककककोोोो अअअअपपपपननननाााानननन ेे ेेििििववववषषषषययययकककक ययययोोोोजजजजननननाााा 11वz पंचवषVय योजना के दौरान और उसके पUच ात जनशिl आवUय कता को पूरा करन े के िलए मानव ससं ाधन िवकास को उGच *ाथिमकता दी जा रही ह ै और िव0ुत Oे- से जुड़ े का(cid:21)मक] को *िशOण ^दया जा रहा ह।ै मू(cid:2)य वान मानव संसाधान] को आक(cid:21)षत करने, सदपु योग करने, िवकिसत करने और उनके संरOण के िलए एक बmत Wय ापक और सारग(cid:21)भत पहल क, गई ह।ै ऐसा अनुमान लगाया गया ह ै ^क 12वz पंचवषVय योजना के दौरान िव0ुत उप(cid:29)क र] के िनमा(cid:23)ण, *चालन और रख रखाव के िलए लगभग एक िमिलयन अित(cid:8)र!त कामगार, पय(cid:23)वेOक और इंजीिनयर] क, आवUय कता होगी। िवशेष iप से िविनvद`ट कौशल वाल े तकनीिशयन] क, भारी सं(cid:127)य ा म (cid:11) आवUय कता होगी। आपू(cid:21)त और मांग के बीच अंतर को कम करने के िलए ''^कसी आईटीआई को अपनाना’’ िवषयक एक योजना इस उtUे य स े शुi क, गई ह ै ता^क प(cid:8)रयोजना Oे- के आसपास कुशल जनशिl तैयार क, जा सके। यहां तक ^क हमारे पास पया(cid:23)?त सं(cid:127)य ा म(cid:11) आईटीआई तो उपल7ध ह,L परंतु काय(cid:23)शाला सुिवधाj के संबंध म(cid:11) मौजूदा अवसंरचना और पया(cid:23)?त स(cid:127)ं य ा म(cid:11) संकाय सद(cid:29)य (फैक(cid:2)ट ी) उपल7ध नहz ह।L गुणव(cid:12)त ायु!त तकनीिशयन तैयार करन े क, िनतातं आवUय कता ह।ै इस योजना के अनसु ार िव0ुत प(cid:8)रयोजनाj के िवकासकता(cid:23)j को अपनी प(cid:8)रयोजनाj के आसपास आईटीआई rारा *िशिOत लोग] को अपनाना ह ै अथवा उस Oे- म (cid:11) नए आईटीआई (cid:29)थ ािपत करने ह L िजससे ^क िव0ुत प(cid:8)रयोजनाj के िनमा(cid:23)ण और *चालन तथा रख रखाव के Oे- म(cid:11) कौशल िवकिसत करने के िलए (cid:29)थ ानीय जनता को अवसर उपल7ध कराया जा सके। क(cid:11)3ीय Oे- के साव(cid:23)जिनक उप(cid:24)म] म(cid:11) कुछ आईटीआई को पहले ही अंगीकार कर िलया ह।ै िनजी Oे- को भी *ो(cid:12)स ािहत ^कया जा रहा ह ै ^क वे िव0तु Oे- के (cid:12)व (cid:8)रत िवकास के िलए बड़ी सं(cid:127)य ा म(cid:11) आवUय क जनशिl तैयार करने म(cid:11) सहयोग कर(cid:11)। 1111....2222....11112222 ििििववववततततररररणणणण ययययोोोोजजजजननननाााा ककककेेेे ििििललललएएएए रररराााा####(( (( ीीीीयययय ििििवववव%%%%ततुुततुु ििििननननििििधधधध ((((एएएएननननईईईईएएएएफफफफ)))) ककककाााा ससससजजजजृृृृ नननन राKय ] क, पारेषण और िवतरण कंपिनय] म(cid:11) मौजूदा ससं ाधन सकं ट के कारण उप पारेषण और िवतरण Oे- म (cid:11) िनवेश िपछड़ा mआ ह।ै उ(cid:12)प ादन और पारेषण तथा िवतरण योजनाj का fेकअप सामा2य त: 50:50 होगा। हालां^क उ(cid:12)प ादन Oे- म(cid:11) अपेOाकृत अिधक िनवेश ^कया जा रहा ह ै और अंतराK(cid:23) य पारेषण *णाली और िवतरण *णाली म(cid:11) अपेिOत अनुपात क, तुलना म(cid:11) काफ, कम मा-ा म(cid:11) िनवेश ^कया जा रहा ह।ै राKय क, िव0तु कंपिनय] को अपनी पारेषण और िवतरण अवसंरचना म(cid:11) सुधार के िलए िव(cid:12)त ीय सहायता *दान करने हते ु रा`< ीय िव0ुत िनिध (एनईएफ) का सजृ न ^कया गया ह।ै 1111....2222....11113333 आआआआईईईईटटटटीीीी आआआआधधधधाााा6666ररररतततत पपपप6666ररररययययोोोोजजजजननननाााा ििििननननगगगगररररााााननननीीीी िव0ुत प(cid:8)रयोजनाj के िनमा(cid:23)ण क, िनगरानी करना बmत क(cid:8)ठन काय (cid:23) ह ै !य ]^क इसके साथ साथ समानांतर iप से बmत से कायक(cid:23) लाप चलते रहते ह।L मै2य ुअल *णाली rारा ^कसी िव0ुत प(cid:8)रयोजना के ^(cid:24)या2व यन क, *गित क, िनगरानी करना काफ, लंबे समय तक संभव नहz ह।ै *भावी िनगरानी *णाली (cid:29)थ ािपत करने के िलए सूचना *ौ0ोिगक, आधा(cid:8)रत िनगरानी को बढ़ावा ^दया गया ह।ै 11वz पंचवषVय योजना म(cid:11) ^(cid:24)याि2वत क, जा रही केवल कुछ ही प(cid:8)रयोजनाj क, िनगरानी वत(cid:23)मान म(cid:11) आईटी आधा(cid:8)रत *णाली के ज(cid:8)रए क, जा रही ह ै जो प(cid:8)रयोजना20 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] क, ^दन *ित^दन क, *गित से अवगत कराती ह।ै बाधाj क, पहचान करन े और प(cid:8)रयोजना ^(cid:24)या2व यन म (cid:11) मौजूदा बाधाj को दरू करने के िलए समय पर कार(cid:23)वाई करने हते ु इस आईटी आधा(cid:8)रत *णाली को सभी जारी प(cid:8)रयोजनाj के िलए लागू ^कए जाने क, आवUय कता ह।ै 1111....3333 कककक@@@@RRRRीीीीयययय ििििवववव%%%%ततुुततुु !!!!ााााििििधधधधककककररररणणणण ////ाााारररराााा ििििवववव%%%%ततुुततुु आआआआययययोोोोजजजजननननाााा क(cid:11)3ीय िव0ुत *ािधकरण (क(cid:11)िव*ा) क, (cid:29)थ ापना िव0ुत (आपू(cid:21)त) अिधिनयम, 1948 क, धारा 3 के अंतग(cid:23)त क, गई और यह िव0ुत अिधिनयम, 2003 के अतं ग(cid:23)त इस े स{पे गए कायF का िन`प ादन करता आ रहा ह।ै क(cid:11)िव*ा दशे म(cid:11) िव0तु O-े के िवकास और सपं णू (cid:23) आयोजना के िलए िज:म दे ार ह।ै क(cid:11)िव*ा एक ऐसा तकनीक, सगं ठन ह ै जो के23 सरकार को िव0ुत के उ(cid:12)प ादन, पारेषण, िवतरण, Wय ापार और सदपु योग स े जुड़ े मुt] पर सलाह और सहायता *दान करता ह।ै क(cid:11)िव*ा को के23 और राKय िनयामक आयोग], राKय सरकार], लाइस(cid:11)धारक], उ(cid:12)प ादन कंपिनय] को ऐस े सभी मामल], िजनम(cid:11) परामश(cid:23) अपेिOत ह ै अथवा ऐसे ^कसी मामले, जो िव0ुत *णाली के दOतापूव(cid:23)क *चालन म(cid:11) उ2ह (cid:11) सOम बनाएगा, पर परामश(cid:23) दने े का दािय(cid:12)व स{पा गया ह।ै क(cid:11)िव*ा को िव0तु अिधिनयम, 2003 के अनुसार स{पे गए कुछ अ2य काय(cid:23)कलाप] म(cid:11) िव0ुत ?ल ांट] के िनमा(cid:23)ण हते ु तकनक, मानक िविनvद`ट करना; िव0ुत ?ल ांट] और लाइन] के िनमा(cid:23)ण, *चालन और रख-रखाव के िलए संरOा आवUय कताए;ं पारेषण लाइन] के *चालन और रख रखाव के िलए ि.ड संबंधी मानक और िव0ुत के पारेषण और आपू(cid:21)त के िलए मीटर लगान े हते ु शत‚ तैयार करना शािमल ह।L 1111....4444 11111111ववववKKKK पपपपचचंंचचंं ववववषषषष>>>>यययय ययययोोोोजजजजननननाााा ककककेेेे ििििललललएएएए रररराााा####(( (( ीीीीयययय ििििवववव%%%%ततुुततुु ययययोोोोजजजजननननाााा क(cid:11)3ीय िव0तु *ािधकरण rारा 10वz पंचवषVय येाजना क, समीOा, 11वz पंचवषVय योजना के िलए िव(cid:29)त ृत योजना और 12वz पंचवषVय योजना के िलए संभािवत योजना को शािमल करते mए नवंबर, 2004 म(cid:11) रा`< ीय िव0ुत योजना तैयार क, गई और सभी पणधारक] को प(cid:8)रचािलत करने के साथ साथ 15 माच(cid:23), 2005 तक उनक, (cid:8)टि?पणयां आमंि-त करते mए क(cid:11)3ीय िव0तु *ािधकरण क, वेबसाइट पर भी अपलोड क, गई, त(cid:12)प Uच ात (cid:8)ट?प िणयां आमंि-त करने क, ितिथ 15 अ*ैल, 2005 तक बढ़ाई गई। क(cid:11)िव*ा को िविभ2न पणधारक] से मसौदा रा`< ीय िव0ुत योजना पर (cid:8)ट?पिणयां *ा?त mM। िविभ2 न पणधारक] से *ा? त िविवध (cid:8)ट?प िणय] और सुझाव] पर िवचार करने के पUच ात *ािधकरण rारा इस योजना को अंितम iप ^दया गया। अंत म(cid:11) जुलाई, 2007 म(cid:11) सरकार rारा यह योजना अनुमो^दत क, गई ओर तीन अग(cid:29)त , 2007 क, गजट सं(cid:127)य ा 159 के अंतगत(cid:23) इस े भारत के राजप- म(cid:11) अिधसूिचत ^कया गया। इस योजना क, समीOा आगामी अnय ाय म(cid:11) दी गई ह।ै 1111....5555 ददददशशेेशशेे मममम @@ @@ववववततततममBBममBB ाााानननन ििििवववव%%%%ततुुततुु पपपप6666ररररददददGGGGृृृृ यय यय (cid:12)(cid:12)(cid:12)(cid:12)थथ थथ ााााििििपपपपतततत (cid:7)(cid:7)(cid:7)(cid:7)ममममतततताााा 31 माच(cid:23), 2012 क, ि(cid:29)थित के अनुसार दशे क, (cid:29)थ ािपत Oमता 1,99,877 मेगावाट थी, जो नीचे !!!!ददददशशशश BB BB 1111....1111 म (cid:11) दशा(cid:23)यी गई ह:ै¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 21 !!!!ददददशशशश BB BB 1111....1111 अअअअििििखखखखलललल भभभभााााररररततततीीीीयययय (cid:12)(cid:12)(cid:12)(cid:12)तततत रररर पपपपरररर (cid:12)(cid:12)(cid:12)(cid:12)थथ थथ ााााििििपपपपतततत (cid:7)(cid:7)(cid:7)(cid:7)ममममतततताााा ((((33331111 ममममााााचचचच,,BB,,BB 2222000011112222 ककककAAAA िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथिििितततत ककककेेेे अअअअननननससुुससुु ाााारररर)))) ****33331111....11110000....2222000011112222 कककक(cid:2)(cid:2)(cid:2)(cid:2) िििि(cid:5)(cid:5)(cid:5)(cid:5)थथथथिििितततत ककककेेेे अअअअननननससुुससुु ाााारररर ददददशशेेशशेे कककक(cid:2)(cid:2)(cid:2)(cid:2) orZeku (cid:5)(cid:5)(cid:5)(cid:5)थथ थथ ााााििििपपपपतततत (cid:18)(cid:18)(cid:18)(cid:18)ममममतततताााा 2222,,,,00009999,,,,222277776666 ममममगगेेगगेे ााााववववााााटटटट हहहह ैै ैैA दशे म(cid:11) नवीकरणीय ऊजा (cid:23) …ोत] स े िव0तु उ(cid:12)प ादन क, अपार संभावनाए ं ह।L इन सभं ावनाj का लाभ उठाने के िलए भारत सरकार rारा हर संभव *यास ^कए जा रह े ह।L 31 माच(cid:23), 2012 क, ि(cid:29)थित के अनुसार नवीकरणीय ऊजा(cid:23) …ोत] स े िव0ुत क, (cid:29)थ ािपत Oमता 24,503 मेगावाट ह।ै नवीकरणीय ऊजा (cid:23) …ोत] स े कुल (cid:29)थ ािपत Oमता म (cid:11) 16,896.6 मेगावाट पवन ऊजा(cid:23), 3410.52 मेगावाट लघु जल िव0ुत प(cid:8)रयोजनाj, 3255.01 मेगावाट बायोमास पावर और बायोमास गैसीफायर से तथा 941.31 मेगावाट सौर पावर और शहरी तथा औ0ोिगक अपिश` ट के iप म(cid:11) शािमल ह।L Qवड टबा(cid:23)इन पावर ?ल ांट क, (cid:29)थ ािपत Oमता के संदभ(cid:23) म(cid:11) िवUव म(cid:11) भारत का 5वा ं (cid:29)थ ान ह।ै !!!!ददददशशशश BB BB 1111....2222 33331111 ममममााााचचचच,,BB,,BB 2222000011113333 ककककAAAA िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथिििितततत ककककेेेे अअअअननननससुुससुु ाााारररर अअअअििििखखखखलललल भभभभााााररररततततीीीीयययय (cid:12)(cid:12)(cid:12)(cid:12)तत तत रररर पपपपरररर (cid:12)(cid:12)(cid:12)(cid:12)थथ थथ ााााििििपपपपतततत (cid:7)(cid:7)(cid:7)(cid:7)ममममतततताााा ((((ननननववववीीीीककककररररणणणणीीीीयययय))))22 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] िविभ2न …ोत] से भारत म(cid:11) (cid:29)थ ािपत और उ(cid:12)प ादन Oमता क, वृिD नीचे *दश(cid:23) 1.3, 1.4 और तािलका 1.2 म(cid:11) दी गई ह।ै ततततााााििििललललककककाााा 1111....2222 ििििवववव%%%%ततुुततुु उउउउMMMMपप पप ााााददददनननन ककककAAAA ववववििृृििृृ SSSS ययययोोोोजजजजननननाााा////ववववषषषष (cid:22)(cid:22) (cid:22)(cid:22) उउउउ(cid:24)(cid:24)(cid:24)(cid:24)पप पप ााााददददनननन ववववििृृििृृ(cid:26)(cid:26)(cid:26)(cid:26) ददददरररर ((((%%%%)))) ििििममममिििि(cid:27)(cid:27)(cid:27)(cid:27)तततत ववववििृृििृृ(cid:26)(cid:26)(cid:26)(cid:26) ((((%%%%)))) 8888वववव(cid:28)(cid:28)(cid:28)(cid:28) ययययोोोोजजजजननननाााा 1111999999992222----99993333 301.07 5.0 6666....66661111 1111999999993333----99994444 323.53 7.5 1111999999994444----99995555 351.03 8.5 1111999999995555----99996666 380.08 8.3 1111999999996666----99997777 394.80 3.9 9999वववव(cid:28)(cid:28)(cid:28)(cid:28) ययययोोोोजजजजननननाााा 1111999999997777----99998888 420.62 6.5 5555....44447777 1111999999998888----99999999 448.37 6.6 1111999999999999----2222000000000000 480.68 7.2 2222000000000000----00001111 499.55 3.9 2222000000001111----00002222 515.25 3.1 11110000tttthhhh PPPPllllaaaannnn 2222000000002222----00003333 531.61 3.2 5555....11116666 2222000000003333----00004444 558.34 5.0 2222000000004444----00005555 587.42 5.2 2222000000005555----00006666 617.51 5.1 2222000000006666----00007777 662.52 7.3 11111111वववव(cid:28)(cid:28)(cid:28)(cid:28) ययययोोोोजजजजननननाााा 2222000000007777----00008888 704.47 6.3 5555....77777777 2222000000008888----00009999 723.79 2.7¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 23 2222000000009999----11110000 777777771111....66660000 6666....6666 2222000011110000----11111111 888811111111....11110000 5555....1111 2222000011111111----11112222 888877777777....00000000 8888....1111 !!!!ददददशशशश BB BB 1111....3333 !!!!ददददशशशश BB BB 1111....4444 वत(cid:23)मान (2011-12) म(cid:11) दशे क, कुल (cid:29)थ ािपत Oमता म(cid:11) कोयला आधा(cid:8)रत Oमता का बड़ा योगदान (57%) ह ै और यह कुल िव0ुत उ(cid:12)प ादन के लगभग 70% के बराबर ह।ै उपयु(cid:23)!त के अलावा एक मेगावाट और उससे अिधक Oमता वाले कैि?टव पावर ?ल ांट] क, (cid:29)थ ािपत Oमता वष(cid:23) 2012-13 के अंत म(cid:11) 36,511 मेगावाट के आसपास रही। वष(cid:23) 2011-12 के दौरान कैि?टव पावर ?ल ांट] से 114.2 िबिलयन यूिनट िव0ुत उ(cid:12)प ादन ^कया गया।24 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ििििवववव%%%%ततुुततुु आआआआपपपपTTूूTTूू तततत ककककAAAA ववववाााा(cid:12)(cid:12)(cid:12)(cid:12)तत तत ििििववववकककक िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथिििितततत िपछले 5 वषF से दशे म(cid:11) िबजली क, कमी बढ़ती जा रही ह।ै वष (cid:23) 2007-08 (11वz पंचवषVय योजना का पहला वष(cid:23)) के दौरान अिधकतम जiरत के समय िव0तु क, कमी (पीक ड^े फिसट) लगभग 18,000 मेगावाट (16.5%) और दशे म(cid:11) औसत ऊजा(cid:23) कमी लगभग 78 िबिलयन यूिनट (11%) थी। वष(cid:23) 2008-09 (11वz पंचवषVय योजना का दसू रा वष(cid:23)) के दौरान अिधकतम जiरत के समय िव0ुत क, कमी (पीक ड^े फिसट) लगभग 13,000 मेगावाट (12%) और दशे म(cid:11) औसत ऊजा(cid:23) कमी लगभग 86 िबिलयन ^कलोवाट (11%) थी। वष(cid:23) 2009-10 (11वz पंचवषVय योजना का तीसरा वष(cid:23)) के दौरान अिधकतम जiरत के समय िव0ुत क, कमी (पीक ड^े फिसट) लगभग 15,157 मेगावाट (13.8%) और दशे म(cid:11) औसत ऊजा (cid:23) कमी लगभग 84 िबिलयन ^कलोवाट (10.1%) थी। वष (cid:23) 2010-11 (11वz पंचवषVय योजना का चौथा वष(cid:23)) के दौरान अिधकतम जiरत के समय िव0ुत क, कमी (पीक ड^े फिसट) लगभग 12,031 मेगावाट (9.8%) और दशे म(cid:11) औसत ऊजा (cid:23) कमी लगभग 73 िबिलयन ^कलोवाट (8.5%) थी। 11वz पंचवषVय योजना के सीमांत वष(cid:23) (2011-12) के दौरान दशे म(cid:11) िव0ुत आपू(cid:21)त क, ि(cid:29)थित क, संिO?त जानकारी तािलका 1.3 म(cid:11) नीचे दी गई ह ै : ततततााााििििललललककककाााा 1111....3333 अअअअििििखखखखलललल भभभभााााररररततततीीीीयययय (cid:12)(cid:12)(cid:12)(cid:12)तततत रररर पपपपरररर ििििवववव%%%%ततुुततुु आआआआपपपपTTूूTTूू तततत ककककAAAA ववववाााा(cid:12)(cid:12)(cid:12)(cid:12)तत तत ििििववववकककक िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथिििितततत ((((2222000011111111----11112222)))) ((((अअअअ!!!!ललैैललैै ,,,, 2222000011111111---- ममममााााचचचच,,BB,,BB 2222000011112222)))) पपपपीीीीकककक ((((ममममेगेगेगेगााााववववााााटटटट)))) ऊऊऊऊजजजजाााा BB BB ((((ििििबबबबििििललललययययनननन 1111ककककललललोोोोववववााााटटटट)))) आआआआववववGGGGयय यय ककककतततताााा 1,30,006 999933337777 उउउउपपपपलललल(cid:2)(cid:2)(cid:2)(cid:2)धध धध तततताााा 1,16,191 888855557777 ((((----)))) ककककममममीीीी////((((++++)))) अअअअििििधधधधशशशशषषेेषषेे (-) 13,815 ((((----)))) 77779999 ((((%%%%)))) ((((----)))) 11110000....6666%%%% ((((----)))) 8888....5555 %%%% 7वz, 8वz, 9वz, 10वz और 11वz पंचवषVय योजनाj के अंत म(cid:11) दशे म(cid:11) ऊजा(cid:23) क, अिध कतम आवUय कता (पीक) और कमी के िववरण नीचे तािलका 1.4 म(cid:11) ^दए गए ह L : ततततााााििििललललककककाााा 1111....4444 ििििपपपपछछछछललललीीीी पपपपचचंंचचंं ववववषषषष>>>>यययय ययययोोोोजजजजननननाााा9999 ककककेेेे ददददौौौौरररराााानननन ििििवववव%%%%ततततुुुु आआआआपपपपTTूूTTूू तततत ककककAAAA िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथिििितततत ससससबबंंबबंं धधंंधधंं ीीीी ििििववववववववररररणणणण (cid:18)(cid:18)(cid:18)(cid:18) ेे ेे //// अअअअििििधधधधककककततततमममम अअअअििििधधधधककककततततमममम अअअअििििधधधधशशशशेषेषेषेष//// अअअअििििधधधधशशशशेषेषेषेष//// ऊऊऊऊजजजजाााा (cid:22)(cid:22) (cid:22)(cid:22) ऊऊऊऊजजजजाााा (cid:22)(cid:22) (cid:22)(cid:22) अअअअििििधधधधशशशशेषेषेषेष//// अअअअििििधधधधशशशशेषेषेषेष//// ममममाााागगंंगगंं उउउउपपपपलललल%%%%धध धध तततताााा ककककममममीीीी ककककममममीीीी आआआआवववव))))यय यय ककककतततताााा उउउउपपपपलललल%%%%धध धध तततताााा ककककममममीीीी ककककममममीीीी रररराााा!!!!यय यय //// ((((ममममगगेेगगेे ाााा ममममगगेेगगेे ाााा ययययििूूििूूननननटटटट ((((ममममगगेेगगेे ााााववववााााटटटट)))) ((((ममममगगेेगगेे ााााववववााााटटटट)))) ((((ममममगगेेगगेे ााााववववााााटटटट)))) ((((ममममगगेेगगेे ााााववववााााटटटट)))) ययययििूूििूूननननटटटट)))) ससससघघंंघघंं रररराााा!!!!यय यय ((((%%%%)))) ((((%%%%)))) 7व(cid:2) पंचवष(cid:8)य 40385 33658 -6727 -16.7 247762 228151 -19611 -7.9 योजना के अतं म (cid:12)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 25 ((((1111999988889999----99990000)))) 8व(cid:2) पंचवष(cid:8)य 63853 52376 -11477 -18.0 413490 365900 -47590 -11.5 योजना के अंत म (cid:12) ((((1111999999996666----99997777)))) 9व(cid:2) पंचवष(cid:8)य 78441 69189 -9252 -11.8 522537 483350 -39187 -7.5 योजना के अंत म (cid:12) ((((2222000000001111----00002222)))) 10व(cid:2) पंचवष(cid:8)य 100715 86818 -13897 -13.8 690587 624495 -66092 -9.6 योजना के अंत म (cid:12) ((((2222000000006666----00007777)))) 11111111वववव(cid:28)(cid:28)(cid:28)(cid:28) पपपपचचंंचचंं ववववषषषष++++यययय ययययोोोोजजजजननननाााा 2222000000007777----00008888 108866 90793 -18073 -16.6 705724 628016 -77708 -11.0 2222000000008888----00009999 109809 96685 -13124 -12.0 774,324 689,021 -85,303 -11.0 2222000000009999----11110000 119166 104009 -15157 -13.8 830594 746644 -83950 -10.1 2222000011110000----11111111 122287 110256 -12031 -9.8 861591 788355 -73236 -8.5 2222000011111111----11112222 1,30,006 1,16,191 -13,815 -10.6 9,37,199 8,57,886 -79,313 -8.5 ववववााााTTTTषषषषकककक इइइइललललििेेििेे VVVV((((कककक ललललोोोोडडडड फफफफैैैैVVVVटट टट रररर वा(cid:21)षक इलेि!<क लोड फैक् ट र *णाली म(cid:11) उपल7ध ऊजा (cid:23) और ऐसी ऊजा(cid:23) के अनुपात के iप म (cid:11) होता ह ै जो *णाली rारा पूरे वष(cid:23) के दौरान वा(cid:21)षक अिधकतम लोड को पूरा करने क, ि(cid:29)थित म(cid:11) आवUय क होती ह।ै यह घटक लोड क, िविभ2न Aेिणय] के सदपु योग करने के तरीक] (पैटन(cid:23)) पर िनभ(cid:23)र करता ह।ै वा(cid:21)षक इलेि!<क लोड फै!ट र वष(cid:23) 2000-2001 स े 80% के आसपास बना mआ ह।ै ऐसा इसिलए संभव हो सका ह ै !य ]^क *णाली म(cid:11) हमेशा कमी मौजूद रही और िविभ2न राKय ] म(cid:11) लोड (cid:29)ट ैगIरग, िवशेष iप से िविभ2न कृिष समूह] को आवUय कतानुसार िव0तु क, आपू(cid:21)त जैसे उपाय ^कए गए। चूं^क यह कमी बढ़ती जा रही है, अत: वा(cid:21)षक इलेि!<क लोड फै!ट र के भी बढ़त े mए „झान दखे ने को िमले। य े „झान !!!!ददददशशशश BB BB 1111....5555 म(cid:11) नीचे दशा(cid:23)ए गए ह L :26 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] !!!!ददददशशशश BB BB 1111....5555 !!!!णणणणााााललललीीीी ललललोोोोडडडड फफफफैैैैVVVVटट टट रररर मममम @@ @@पपपप6666ररररववववततततननBBननBB आआआआररररिििि(cid:7)(cid:7)(cid:7)(cid:7)तततत ममममााााTTTTजजजजनननन औऔऔऔरररर हहहहााााइइइइWWWWोोोो थथथथममममललBBललBB ििििममममXXXXणणणण ^कसी *णाली के आरिOत मा(cid:21)जन को *ा?त ^कए गए अिधकतम लोड के *ितशत के iप म(cid:11) (cid:29)थ ािपत Oमता और *ा?त ^कए गए अिधकतम लोड के बीच अंतर के iप म(cid:11) प(cid:8)रभािषत ^कया जाता ह।ै यह घटक बmत से मानदडं ] पर िनभ(cid:23)र करता ह,ै िजनम(cid:11) से *मुख मानदडं िव0ुत उ(cid:12)प ादन का तरीका अथा(cid:23)त हाइPो, थम(cid:23)ल और नवीकरणीय और उ(cid:12)प ादन (cid:29)ट ेशन] क, उपल7ध ता पर िनभ(cid:23)र करता ह।ै अ2य दशे ] म(cid:11) आरिOत मा(cid:21)जन 16% स े लेकर 75% के बीच अलग अलग ह।ै उ(cid:12)प ादन के Oे- म(cid:11) हाइPो-थम(cid:23)ल िमAण के *ितशत म (cid:11) आिं शक वृिD mई ह ै और यह वष(cid:23) 2001-02 म (cid:11) 25.4% स े बढ़कर 31 माच(cid:23), 2007 क, ि(cid:29)थित के अनुसार लगभग 27.82% हो गया ह ै और इसके बाद इसम(cid:11) कुछ कमी आती रही और अब 31 माच(cid:23), 2012 क, ि(cid:29)थित के अनुसार यह लगभग 22.23% ह।ै यह मु(cid:127)य iप से 11वz पंचवषVय योजना के दौरान भारी मा-ा म(cid:11) ताप िव0तु Oमता अिभवृिD के प(cid:8)रणाम(cid:29)व iप संभव mआ ह।ै हालां^क आरिOत मा(cid:21)जन म(cid:11) वष(cid:23) 2001-02 म(cid:11) 49.74% क, तुलना म(cid:11) वष(cid:23) 2009-10 म(cid:11) 38.33% क, कमी mई ह ै और वष(cid:23) 2011- 12 तक एक बार ^फर यह बढ़कर 50.94% हो गया ह।ै इससे संबंिधत जानकारी !!!!ददददशशशश BB BB 1111....6666 म(cid:11) नीच े दी गई ह:ै¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 27 !!!!ददददशशशश BB BB 1111....6666 आआआआररररिििि(cid:7)(cid:7)(cid:7)(cid:7)तततत ममममााााTTTTजजजजनननन औऔऔऔरररर हहहहााााइइइइWWWWोोोो थथथथममममललBBललBB ििििममममXXXXणणणण आरिOत मा(cid:21)जन म(cid:11) यह कमी वष(cid:23) 2001-02 म(cid:11) 69.9% थम(cid:23)ल पीएलएफ म(cid:11) वष(cid:23) 2011-12 म(cid:11) 73.23% क, वृिD के प(cid:8)रणाम(cid:29)व iप mई ह ै जो *ौ0ोिगक,य सुधार तथा थम(cid:23)ल मशीन] के *चालन और रख-रखाव क, *^(cid:24)याj तथा उGच तर दOता मानदडं ] के फल(cid:29)व iप संभव mआ ह।ै वष(cid:23) 2011-12 के दौरान अब तक का अिधकतम आरिOत मा(cid:21)जन यह दशा(cid:23)ता ह ै ^क Mधन क, कमी के कारण बड़ े थम(cid:23)ल ?ल ांट] (Oमताए)ं का *चालन नहz हो पा रहा ह।ै इससे संबंिधत िववरण !!!!ददददशशशश BB BB 1111....7777 म (cid:11) नीच े ^दए गए ह।L !!!!ददददशशशश BB BB 1111....7777 आआआआरर रर िििि(cid:7)(cid:7)(cid:7)(cid:7)तततत ममममााााTTTTजजजजनननन औऔऔऔरररर पपपपीीीीएएएएललललएएएएफफफफ ककककाााा अअअअततंंततंं रररर28 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] गैस ?ल ांट] का भी ?ल ांट लोड फै!ट र वष(cid:23) 2000-01 म(cid:11) 48% से बढ़कर 2009-10 म(cid:11) 65% हो गया। वष (cid:23) 2009- 10 के दौरान गैस ?ल ांट] के पीएलएफ म(cid:11) वृिD केजी बेिसन से अित(cid:8)र!त मा-ा म(cid:11) गैस क, उपल7ध ता के कारण संभव mई। हांला^क केजी डी6 बेिसन से गैस का उ(cid:12)प ादन कम होने के कारण 2011-12 के दौरान गैस ?ल ांट लोड फै!ट र म(cid:11) काफ, कमी हो गई। हालां^क Mधन क, कमी के कारण वष(cid:23) 2000-01 म(cid:11) 82% का आकं ड़ा छूने वाला परमाणु लोड फै!ट र वष(cid:23) 2007-08 म(cid:11) घटकर 46.5% हो गया, परंतु 2011-12 म(cid:11) यह बढ़कर 73.9% हो गया ह।ै हालां^क आरिOत मा(cid:21)जन पर इसका केवल मामूली *भाव पड़ा ह ै !य ]^क दशे क, (cid:29)थ ािपत Oमता म(cid:11) परमाणु Oमता का बmत ही कम योगदान ह।ै ऐसी आशा क, जाती ह ै ^क थम(cid:23)ल िव0तु उ(cid:12)प ादन क, *ौ0ोिगक, म(cid:11) सुधार और बड़ े आकार वाली यूिनट(cid:11) (cid:29)थ ािपत ^कए जान े के साथ साथ गैस तथा परमाणु Mधन क, बेहतर उपल7ध ता से भिव`य म(cid:11) आरिOत मा(cid:21)जन म(cid:11) भी सुधार होने क, संभावना ह।ै हालां^क Mधन क, कमी के साथ साथ नवीकरणीय Oमताj म(cid:11) बेहतर वृिD के कारण आरिOत मा(cid:21)जन भी बढ़ सकता ह।ै उ(cid:12)स ाहजनक िवशेषता यह ह ै ^क िपछले कुछ वषF म(cid:11) आरिOत मा(cid:21)जन म(cid:11) कमी हो रही, इसके बावजूद भी हाइPो थम(cid:23)ल िम!स के प(cid:8)रणाम बmत ही कम अंतर के साथ सामने आए ह।L इसका आशय यह ह ै ^क थम(cid:23)ल (cid:29)ट ेशन] के पीएलएफ म(cid:11) वृिD के कारण आरिOत मा(cid:21)जन म(cid:11) मु(cid:127)य iप से कमी होती ह।ै बजाय इसके ^क (cid:29)थ ािपत Oमता के हाइPो थम(cid:23)ल िम!स को घटनाने से आरिOत मा(cid:21)जन बढ़ता ह।ै सामा2य त: ऐसा कहा जाता ह ै ^क आरिOत मा(cid:21)जन का हाइPो थम(cid:23)ल िम!स नवीकरणीय – थम(cid:23)ल िम!स के साथ *(cid:12)य O संबंध ह।ै जसै े ही इस *कार के िमAण म(cid:11) वृिD होती ह ै आरिOत मा(cid:21)जन भी बढ़ जाता ह।ै 1111....6666 11112222ववववKKKK पपपपचचंंचचंं ववववषषषष>>>>यययय ययययोोोोजजजजननननाााा ककककAAAA रररराााा####(( (( ीीीीयययय ििििवववव%%%%ततुुततुु ययययोोोोजजजजननननाााा अिधिनयम और नीित म(cid:11) ^कए गए संशोधन] के अनुसार क(cid:11)3ीय िव0ुत *ािधकरण ने 12वz पंचवषVय योजना के िलए रा`< ीय िव0ुत योजना, 13वz पंचवषVय योजना के िलए संभािवत योजना और 11वz योजना के काया(cid:23)2व यन क, ि(cid:29)थित पर एक समीOा(cid:12)म क योजना तैयार क, ह।ै मसौदा एनईपी सभी पणधारक] क, (cid:8)ट?प िणय] / सुझाव] के िलए उ2ह (cid:11) प(cid:8)रचािलत क, गई, उनके सुझाव] को एनईपी म(cid:11) उपयु!त तरीके से शािमल ^कया गया ह।ै पणधारक] से *ा?त (cid:8)ट?प िणय] क, एक *ित अअअअननननबबुुबबुु धधंंधधंं 1111....2222 म (cid:11) संलaन ह।ै अअअअननननबबुुबबुु धधंंधधंं 1111....1111 अअअअ(cid:21)(cid:21)(cid:21)(cid:21)(( (( ाााा ममममगगेेगगेे ाााा पपपपााााववववरररर पपपप6666ररररययययोोोोजजजजननननाााा9999 ककककAAAA िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथिििितततत 8888.... ययययएएूूएएूू ममममपपपपीीीीपपपपीीीी////रररराााा????यय यय ककककाााा (cid:7)(cid:7)(cid:7)(cid:7)ममममतततताााा ककककोोोोययययललललाााा आआआआपपपपTTूूTTूू तततत ककककाााा िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथिििितततत सससस..ंं..ंं ननननाााामममम ((((ममममेगेगेगेगााााववववााााटटटट)))) YYYYोोोोतततत ममममललूूललूू 0000पपपप सससस ेे ेेपपपप6666ररररककककिििि(cid:21)(cid:21)(cid:21)(cid:21)पपपपतततत 9999 ययययएएएएूूूू ममममपपपपीीीीपपपपीीीी ककककAAAA िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथिििितततत 1111 सासन 6x660 कैि?टव कोयला प(cid:8)रयोजना का अिधिनण(cid:23)य और ह(cid:29)त ातं रण यूएमपीपी/मnय *दशे 7ल ॉक मोहर, मोहर मैसस(cid:23) (cid:8)रलायसं पावर िलिमटेड को 7 अग(cid:29)त अमरौली िव(cid:29)त ार, 2007 को ^कया गया। प(cid:8)रयोजना छ-साल िनमा(cid:23)णाधीन ह।ै इसक, सभी 6 यूिनट] क, (cid:29)थ ापना 12वz पंचवषVय योजना म(cid:11) ^कए जाने क, आशा ह।ै¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 29 2222 मुं3ा यूएमपीपी/ 5x800 आयाितत कोयला प(cid:8)रयोजना का अिधिनण(cid:23)य और ह(cid:29)त ातं रण गुजरात मैसस(cid:23) टाटा पावर िलिमटेड को 24 अ*ैल 2007 को ^कया गया। प(cid:8)रयोजना िनमा(cid:23)णाधीन ह।ै मुं3ा यूएमपीपी क, 800 मेगावाट वाली पहली और दसू री यूिनट] का Qस(cid:24)ोनाइजेशन (cid:24)मश: 8.1.2012 और 10.7.2012 को ^कया गया और 7 माच(cid:23), 2012 तथा 30 जुलाई 2012 स े इन यूिनट] का वािणिKयक *चालन शुi ^कया गया। शेष बची 3 यूिनट] क, (cid:29)थ ापना 12वz पंचवषVय योजना म(cid:11) ^कए जाने क, आशा ह।ै 3333 कृ`ण ाप}नम 6x660 आयाितत कोयला प(cid:8)रयोजना का अिधिनण(cid:23)य और ह(cid:29)त ातं रण यूएमपीपी/आं| *दशे 29 जनवरी, 2008 को मैसस(cid:23) (cid:8)रलायंस पावर िलिमटेड को ^कया गया। कृ`ण ाप}नम यूएमपीपी के िवकासकता (cid:23) – मैसस(cid:23) को(cid:29)ट ल आं|ा पावर िलिमटेड (सीएजीपीएल) ने िनमा(cid:23)ण काय(cid:23) शुi कर ^दया था, परंतु उसन े इंडोनेिशया सरकार rारा कोयले क, क,मत संबंधी नए िविनयम जारी ^कए जाने का कारण बताते mए िनमा(cid:23)ण काय(cid:23) रोक ^दया ह।ै *मुख खरीददार (एमपीएसपीडीसीएल) rारा िनलंबन नो(cid:8)टस के िव„D सीएपीएल rारा जारी क, गई यािचका को ^द(cid:2)ल ी उGच 2य ायालय ने खा(cid:8)रज कर ^दया ह।ै सीएपीएल ने ^द(cid:2)ल ी उGच 2य ायालय क, संभा गीय ब(cid:11)च के साथ साथ मnय (cid:29)थ ता के िलए भारतीय माnय (cid:29)थ म प(cid:8)रषद से भी पहल क, ह।ै मामला िवचाराधीन ह।ै 4444 ितलैया यूएमपीपी/ 6x660 कैि?टव कोयला प(cid:8)रयोजना का अिधिनण(cid:23)य और ह(cid:29)त ातं रण झारखंड 7ल ॉक केरंदरी बी 7 अग(cid:29)त , 2009 को मैसस(cid:23) (cid:8)रलायंस पावर और सी िलिमटेड को ^कया गया। पलांट का िनमा(cid:23)ण काय(cid:23) अभी शुi ^कया जाना ह ै !य ]^क भूिम का ह(cid:29)त ांतरण िवकासकता (cid:23) को अभी नहz ^कया गया ह।ै पीपीए के अनुसार 660 मेगावाट वाली पांच यूिनट] क, (cid:29)थ ापना 12वz पंचवषVय योजना अविध के दौरान और शेष 1 यूिनट क, (cid:29)थ ापना 13वz पंचवषVय योजना म(cid:11) ^कया जाना अिधसूिचत ह।ै 5555 यूएमपीपी/उड़ीसा 4000 कैि?टव कोयला प(cid:8)रयोजना के िवकासकता (cid:23) के चयन हते ु 7ल ॉक मीनाOी, अहत(cid:23) ा के िलए अनुरोध (आरएफ !य ू) मीनाथी बी और बोिलयां *ा?त हो गई ह L और उनका मीनाOी कोयला मू(cid:2)य ांकन ^कया जा रहा ह।ै30 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 7ल ॉक का िडपसाइड 6666 यूएमपीपी/छ(cid:12)त ीसगढ़ 4000 कैि?टव कोयला प(cid:8)रयोजना के िवकासकता (cid:23) के चयन हते ु 7ल ॉक Qप3ाखी और अहत(cid:23) ा के िलए अनरु ोध (आरएफ !य ू) मई पुटा परोिगया 2002 म (cid:11) जारी कर ^दए गए ह।L आरएफ!य ू बोिलयां *(cid:29)त ुत करने क, तारीख बढ़ाई गई ह ै !य ]^क प(cid:8)रयोजना के िलए आवं(cid:8)टत कैि?टव कोयला 7ल ॉक] के िलए एमओईएफ से (cid:29)व ीकृित *ा?त नहz mई ह ै !य ]^क उस े पहले Aेणी 'क' के अंतग(cid:23)त रखा गया था। 7777 चेयूर यूएमपीपी/ 4000 आयाितत कोयला प(cid:8)रयोजना के िलए (cid:29)थ ल का चयन कर तिमलनाडु िलया गया ह।ै पावर ?ल ांट के िलए आरईआईए (cid:8)रपोट(cid:23) को अंितम iप ^दया जा रहा ह।ै मानक बोली द(cid:29)त ावेज] (एसबीडी) म (cid:11) सशं ोधन हो जान े के पUच ात आरएफ!य ू जारी ^कए जाएगं े। 8888 यूएमपीपी/ महारा`< 4000 आयाितत कोयला (cid:29)थ ानीय लोग] के िवरोध के कारण (cid:29)थ ल का चयन नहz ^कया जा सका ह।ै 9999 यूएमपीपी/ कना(cid:23)टक 4000 आयाितत कोयला मूल iप से ता3ी म(cid:11) िनधा(cid:23)(cid:8)रत ^कए गए (cid:29)थ ल को (cid:29)थ ानीय लोग] rारा ^कए जा रह े आंदोलन के कारण अंितम iप नहz ^दया जा सका। खखखख ससससाााातततत अअअअिििितततत6666ररररVVVVतत तत ययययएएूूएएूू ममममपपपपीीीीपपपपीीीी ककककAAAA िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथिििितततत 1111.... आं| *दशे म(cid:11) दसू री 4000 आयाितत कोयला नयनप(cid:2)ल ी गांव (*काशम िजला) म(cid:11) यूएमपीपी प(cid:8)रयोजना के िलए (cid:29)थ ल क, पहचान क, गई ह।ै भूिम अिध.हण क, *^(cid:24)या शुi कर दी गई ह।ै 2222 उड़ीसा म(cid:11) अित(cid:8)र!त 4000 कैि?टव कोयला भ3क िजल े म(cid:11) (cid:29)थ ल (तटवतV (cid:29)थ ल) क, यूएमपीपी-। 7ल ॉक बनखनी पहचान कर ली गई ह।ै 3333 उड़ीसा म(cid:11) अित(cid:8)र!त 4000 कैि?टव कोयला कालाहांड़ी िजले म(cid:11) (cid:29)थ ल (अंतदशX ी (cid:29)थ ल) यूएमपीपी-।। 7ल ॉक – घोघरप(cid:2)ल ी क, पहचान कर ली गई ह।ै और घोघरप(cid:2)ल ी का िडपसाइड 4444 गुजरात म(cid:11) दसू री 4000 आयाितत कोयला (cid:29)थ ल क, जांच क, जा रही ह।ै यूएमपीपी 5555 झारखंड म(cid:11) दसू री 4000 कैि?टव कोयला दवे घर िजल े म(cid:11) (cid:29)थ ल क, पहचान कर ली गई यूएमपीपी 7ल ॉक ह।ै जल उपल7ध ता अnय यन *गित पर ह।ै 6666 तिमलनाडु म(cid:11) दसू री 4000 आयाितत कोयला (cid:29)थ ल क, जांच क, जा रही ह।ै यूएमपीपी 7777 िबहार म(cid:11) यूएमपीपी 4000 कैि?टव कोयला (cid:29)थ ल क, जांच क, जा रही ह।ै 7ल ॉक¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 31 अअअअननननबबुुबबुु धधंंधधंं ---- 1111....2222 ििििववववििििभभभभ4444नन नन पपपपणणणणधधधधााााररररकककक;;;; सससस ेे ेे!!!!ाााा::::तत तत 6666टटटट::::पप प प ििििणणणणययययाााा//ंं//ंं ससससझझुुझझुु ाााावववव 8888.... सससस..ंं..ंं ((((ककककंंंंपपपपननननीीीी////ससससगगंंगगंं ठठठठनननन//// ZZZZयय यय िििि[[[[ 6666टटटट::::पप पप ििििणणणणयययय;;;; ककककाााा ससससााााररररााााशशंंशशंं हहहहममममाााारररराााा ददददििििृृृृ \\\\ककककोोोोणणणण////अअअअववववललललोोोोककककनननन ििििववववशशशशषषेेषषेे )))) सससस ेे ेे !!!!ाााा::::तत तत 6666टटटट::::पप पप ििििणणणणययययाााा ंं ंं 1. चुंगथंग हाइPो पावर िस^†म म(cid:11) 99 मेगावाट Oमता वाली जल प(cid:8)रयोजना के शे(cid:2)फ म(cid:11) शािमल *ाइवेट िलिमटेड िव0ुत प(cid:8)रयोजना को शािमल करना ^कया जा सकता ह।ै िजसे कंपनी rारा माच(cid:23), 2017 से पहल े (cid:29)थ ािपत करन े क, अपेOा ह।ै 2. वत(cid:23)िसला इंिडया िल. पी‡कग पावर ?ल ांट] पर बmत से सुझाव हम एनईपी के संगत अnय ाय म (cid:11) और गैस इंजन का उ(cid:2)ल ेख करने, डटे ा/ अ0तन सूचना/डटे ा शािमल कर सूचना को अ0तन करन े के सुझाव। सकते ह,L िजसम(cid:11) गैस इंजन स े इसके अलावा यह भी सुझाव ^दया गया संबंिधत जानकारी उपयु!त ढ़ग से ^क 5 मे<ो शहर] म(cid:11) लगभग 2000 दी जाएगी। शु„आत म(cid:11) हम 5 मे<ो मेगावाट पी‡कग Oमता वाले ?ल ांट शहर] म(cid:11) 400 मेगावाट पी‡कग (*(cid:12)य के 400 मेगावाट) क, (cid:29)थ ापना क, Oमता को बनाए रख सकते ह।L बजाय इसे कई बड़ े शहर] म(cid:11) िवत(cid:8)रत जहां तक िवत(cid:8)रत iप से पी‡कग ^कया जाना चािहए (20 शहर] म(cid:11) सभी पावर ?ल ांट] क, (cid:29)थ ापना का जगह 100 मेगावाट के iप म(cid:11)) संबंध ह,ै तो पी‡कग पावर ?ल ांट पर काय(cid:23)बल क, बैठक म(cid:11) Wय !त ^कए गए िवचार] को शािमल करने पर िवचार ^कया जाए। 3 इंिडयन Qवड पावर (क) ककककैैैैिििि::::टटटटवववव पपपपााााववववरररर NNNNहहहहकककक;;;; ककककोोोो !!!!ोोोोMMMMसस सस ााााििििहहहहतततत सभी मुt]/सम(cid:29)य ाj के साथ साथ एसोिसएशन एसोिसएशन rारा ^दए गए सुझाव ककककररररननननाााा : 1.4.2012 से भतू लOी *भाव स े के अनुसार Qवड पावर स े सबं ंिधत आयकर अिधिनयम के अतं ग(cid:23)त (cid:12)व (cid:8)रत *ो(cid:12)स ाहन टॉप के मुt े पर मू(cid:2)य ˆास का लाभ पुन: बहाल करना। एमएनआरई rारा िवचार ^कया कैि?टव .ाहक िनयामक आयोग] rारा जाए। जहा ं तक एनईपी का संबंध िनधा(cid:23)(cid:8)रत आरपीओ नहz भर सकते ह।L ह,ै 12वz और 13वz पंचवषVय (ख) ििििवववव%%%%ततुुततुु बबबबोोोोडडडड BB BB ककककोोोो पपपपववववनननन ििििवववव%%%%ततुुततुु ककककAAAA योजना के िलए एमएनआरई rारा ििििबबबब8888AAAA ककककररररनननन ेे ेेववववाााालललल ेे ेेउउउउMMMMपप पप ााााददददकककक;;;; ककककोोोो !!!!ोोोोMMMMसस सस ााााहहहहनननन *(cid:29)त ुत ^कए गए आरईएस काय(cid:23)(cid:24)म (ग) ििििवववव%%%%ततुुततुु पपपप6666ररररययययोोोोजजजजननननाााा ककककेेेे पर िवचार ^कया गया ह।ै ििििववववककककााााससससककककतततताााा99BB99BB ककककोोोो !!!!ोोोोMMMMसस सस ााााहहहहनननन : िव0ुत क, कमी और सम(cid:29)य ा झेल रह े राKय ] म (cid:11) पवन िव0ुत प(cid:8)रयोजनाj क, (cid:29)थ ापना हते ु क, गई खरीद पर वैट और सीएसटी से छूट (घ) Qवड पावर से संबंिधत अ2य सामान य् मुt े 4. लिलतपुर पावर 3x660 मेगावाट Oमता वाली लिलतपुर प(cid:8)रयोजना के िलए Mधन संपक(cid:23) जनरेशन कंपनी तय नहz ^कए गए ह,L इस *कार32 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 8888.... सससस..ंं..ंं ((((ककककंंंंपपपपननननीीीी////ससससगगंंगगंं ठठठठनननन//// ZZZZयय यय िििि[[[[ 6666टटटट::::पप पप ििििणणणणयययय;;;; ककककाााा ससससााााररररााााशशंंशशंं हहहहममममाााारररराााा ददददििििृृृृ \\\\ककककोोोोणणणण////अअअअववववललललोोोोककककनननन ििििववववशशशशषषेेषषेे )))) सससस ेे ेे !!!!ाााा::::तत तत 6666टटटट::::पप पप ििििणणणणययययाााा ंं ंं पावर जनरेशन कंपनी को Aेणी (ग) के हम इस बात से सहमत नहz ह L ^क बजाय Aेणी (क) सूची म(cid:11) शािमल ^कया प(cid:8)रयोजना को शे(cid:2)फ म(cid:11) बनाए जाए, िजसके िलए बीटीजी हते ु आदशे रखा जाए। *(cid:29)त ुत कर ^दए गए ह L और सभी (cid:29)व ीकृितयां *ा?त कर ली गई ह।L 5. पावर िस(cid:29)ट म (i) एनईपी को एक संभािवत योजना के (i) एनईपी म(cid:11) 11वz पंचवषVय ऑपरेशन कॉपSरेशन iप म(cid:11) तैयार ^कए जाने क, आवUय कता योजना और जारी 12वz िलिमटेड ह,ै िजसम(cid:11) कम से कम एक दशक क, पंचवषVय योजना तथा सभं ािवत *गित/घटना(cid:24)म को शािमल ^कया जाना 13वz पंचवषVय योजना अथा(cid:23)त चािहए और इसम(cid:11) 15 वष(cid:23) क, संभािवत 15 वष(cid:23) क, अविध के िववरण त(cid:29)व ीर *(cid:29)त ुत क, जानी चािहए। शािमल ह।L (ii) योजना को लो कि*य बनाने के िलए (ii) Oे-ीय (cid:29)त र पर बैठक] का काय(cid:23)शालाए ं / रोडशो आयोिजत ^कए आयोजन ^कया गया ह ै और जाने चािहए। रोडशो आ^द आयोिजत करना संभव नहz ह।ै (iii) एनईपी को भारत के राजप- (iii) एनईपी पहले क, तरह िब(cid:24), आधार म(cid:11) *कािशत ^कया जाना ह।ै पर उपल7ध कराए जान े के बजाय राजप- म(cid:11) अिधसूचना के पUच ात साव(cid:23)जिनक डोमेन म(cid:11) उपल7ध होनी एनईपी को क(cid:11)िव*ा क, वेबसाइट चािहए। पर अपलोड करन े का िनण(cid:23)य िलया जा सकता ह।ै (iv) जल िव0ुत प(cid:8)रयोजनाj पर (iv) योजना के अंतग(cid:23)त भावी पंप (cid:29)ट ोरेज उनक, ि(cid:29)थित के आधार पर योजनाj पर जोर ^दया जाना चािहए। एनईपी म(cid:11) शािमल करने के िलए िवचार ^कया गया ह।ै (v) थम(cid:23)ल प(cid:8)रयोजनाj के िलए (v) 12वz पंचवषVय योजना म(cid:11) कोयला जल क, उपल7ध ता एक सम(cid:29)य ा ह ै आधा(cid:8)रत ?ल ान क, बड़ी Oमता और इसे एनईपी म(cid:11) शािमल ^कया अिभवृिD (लगभग 66 जीड7(cid:2) य ू) को गया ह,ै िजसे आगे िवशेष iप स े nय ान म(cid:11) रखते mए िव0तु क, कमी के उि(cid:2)लिखत ^कया जाएगा। हालां^क प(cid:8)रणाम(cid:29)व iप जल के सकं ट को इस वत(cid:23)मान म(cid:11) काया(cid:23)ि2वत क, जा रही द(cid:29)त ावेज म(cid:11) िवशेष iप से उि(cid:2)लिखत प(cid:8)रयोजनाj के िलए जल आवंटन करने क, आवUय कता ह।ै कर ^दया गया ह।ै (vi) मामला-1, मामला-2 और मच‚ट (vi) इस सूचना को योजना म (cid:11)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 33 8888.... सससस..ंं..ंं ((((ककककंंंंपपपपननननीीीी////ससससगगंंगगंं ठठठठनननन//// ZZZZयय यय िििि[[[[ 6666टटटट::::पप पप ििििणणणणयययय;;;; ककककाााा ससससााााररररााााशशंंशशंं हहहहममममाााारररराााा ददददििििृृृृ \\\\ककककोोोोणणणण////अअअअववववललललोोोोककककनननन ििििववववशशशशषषेेषषेे )))) सससस ेे ेे !!!!ाााा::::तत तत 6666टटटट::::पप पप ििििणणणणययययाााा ंं ंं ?ल ांट] के िववरण ^दए जाए।ं शािमल नहz ^कया जा सकता ह ै !य ]^क यह गितशील *कृित क, सूचना ह।ै (vii) कोयला आधा(cid:8)रत Oमता के (vii) कोयला उपल7ध न होने क, ि(cid:29)थित िबना कोई भी Wय वहाय(cid:23) योजना म(cid:11) योजना बी तैयार क, जाए। तैयार नहz क, जा सकती ह।ै इसके साथ साथ कोल इंिडया िलिमटेड से भी अपने उ(cid:12)प ादन म (cid:11) सुधार करने के िलए अनुरोध ^कया गया ह।ै (viii) अिखल भारतीय (cid:29)त र पर (viii) मौसमवार िववरण सिहत योजना बनाई जा रही ह।ै राKय ] राKय वार लोड और आईसी ि(cid:29)थित को को िव0ुत के संबंध म(cid:11) समझौत े शािमल ^कया जाए। करने ह।L मामला-1, मामला-2 बोिलय] के ज(cid:8)रए (ix) डटे ा/सूचना को अ0तन करने स े (ix) उपयु!त तरीके स े संबंिधत िविभ2न पैरा/अnय ाय] पर अ2य शािमल/अ0तन ^कए जाए ं (cid:8)ट?प िणयां। 6. झबुआ पावर िलिमटेड मnय *दशे म(cid:11) कोयला आधा(cid:8)रत टीपीएस प(cid:8)रयोजनाj क, सचू ी म(cid:11) शािमल झबुआ पावर िलिमटेड (1x660 क, जाए। मेगावाट) को भी 12वz पंचवषVय योजना सूची म(cid:11) शािमल ^कया जाना चािहए। 7. चै:ब र ऑफ (cid:29)म ॉल (i) 30,000 मेगावाट क, उGच तर नवीकरणीय Oमता एमएनआरई इंड(cid:29)< ी एसोिसएशन काय(cid:23)(cid:24)म के अनुसार ह।ै उGच नवीकरणीय Oमता शािमल करना। नवीकरणीय प(cid:8)रदUृ य तैयार ^कया कोयले क, कमी को nय ान म(cid:11) रखते mए गया ह।ै अिधक मा-ा म(cid:11) कोयले का आयात, प(cid:8)रवहन सम(cid:29)य ा और भूिम अिध.हण आ^द। रा`< ीय िव0ुत नीित के अनुसार (ii) 2.5 स े 3% के बीच ि(cid:29)पQनग (cid:8)रजव (cid:23) ि(cid:29)पQनग (cid:8)रजव(cid:23) (5%) रखने के बनाए रखना। िलए योजना बनाई जा रही ह।ै (iii) टी ए@ड डी हािनय] को 12% तक घटाना। (iv) सूsम , लघ ु और मnय म उ0म] म (cid:11)34 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 8888.... सससस..ंं..ंं ((((ककककंंंंपपपपननननीीीी////ससससगगंंगगंं ठठठठनननन//// ZZZZयय यय िििि[[[[ 6666टटटट::::पप पप ििििणणणणयययय;;;; ककककाााा ससससााााररररााााशशंंशशंं हहहहममममाााारररराााा ददददििििृृृृ \\\\ककककोोोोणणणण////अअअअववववललललोोोोककककनननन ििििववववशशशशषषेेषषेे )))) सससस ेे ेे !!!!ाााा::::तत तत 6666टटटट::::पप पप ििििणणणणययययाााा ंं ंं *यु!त ऊजा(cid:23) के 5.57% तक ऊजा(cid:23) खपत को कम करना। (v) ऐसे Oे- जहां आर ए@ड डी हािनया ं अिधक ह,L म(cid:11) ऊजा(cid:23) टै(cid:8)रफ 10% अिधक होना चािहए। 8. इंिडयन Qवड एनजV (i)सोलर और Qवड Oे- को सवा(cid:23)िधक एनईपी म(cid:11) पवन Oमता अिभवृिD एसोिसएशन *ाथिमकता दी जानी चािहए। काय(cid:23)(cid:24)म एमएनआरई से *ा?त इनपुट के अनुसार तैयार ^कया जा रहा ह।ै (ii) सौर ऊजा (cid:23) Oे- क, तरह Qवड पावर को भी उतनी ही मा2य ता दी जानी *ो(cid:12)स ाहन आ^द से संबंिधत अ2य चािहए। मुt] को एमएनआरई के साथ उठाया जा सकता ह।ै (iii) पवन ऊजा(cid:23) के िलए नीितगत उपाय जैसे (cid:12)व (cid:8)रत मू(cid:2)य ˆास आ^द शािमल ^कए जाए।ं (iv) ऑनशोर Oमता लगभग 1 लाख मेगावाट (80 एमटीएस हब ऊंचाई पर) ह ै जो सीड7(cid:2) य ूईटी rारा लगाए गए अनुमान 45,000 मेगावाट (50 एमटीएस हब ऊंचाई पर) क, तुलना म (cid:11) काफ, अिधक ह।ै (v) संभािवत पवन Oमता और Oमता अिभवृिD के मुt े का एनईपी म(cid:11) उिचत ढंग से समाधान ^कया जाना चािहए। पवन ऊजा(cid:23) के िलए भी नीित तैयार क, जानी चािहए। 9. डा. भरत (i) ऐसा *तीत होता ह ै ^क लगभग (i) मांग पूवा(cid:23)नुमान 18वz ईपीएस झुनझुनवाला, भूतपव ू(cid:23) 80,000 मेगावाट Oमता अिभवृिD का (cid:8)रपोट(cid:23) के अनुसार लगाए गए ह।L *ोफेसर, आईआईएम लsय लगभग 3 „पए *ित ^कलोवाट के बंगलौर वत(cid:23)मान मू(cid:2)य पर मांग अनुमान] पर आधा(cid:8)रत ह,ै जब^क यह लगभग 6 „पए¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 35 8888.... सससस..ंं..ंं ((((ककककंंंंपपपपननननीीीी////ससससगगंंगगंं ठठठठनननन//// ZZZZयय यय िििि[[[[ 6666टटटट::::पप पप ििििणणणणयययय;;;; ककककाााा ससससााााररररााााशशंंशशंं हहहहममममाााारररराााा ददददििििृृृृ \\\\ककककोोोोणणणण////अअअअववववललललोोोोककककनननन ििििववववशशशशषषेेषषेे )))) सससस ेे ेे !!!!ाााा::::तत तत 6666टटटट::::पप पप ििििणणणणययययाााा ंं ंं *ित ^कलोवाट के िव0ुत मू(cid:2)य पर आधा(cid:8)रत होना चािहए (पया(cid:23)वरण संबंधी बा‰ सम(cid:29)य ाj को nय ान म(cid:11) रखते mए)। (ii) दशे म(cid:11) केवल उतनी ही िव0ुत का (ii) हमारा *यास रा`< ीय िव0ुत उ(cid:12)प ादन और खपत होनी चािहए जो िव0ुत के वा(cid:29)त िवक मू(cid:2)य पर वािणिKयक नीित के अनुसार संपूण(cid:23) मांग को iप से 2य ायोिचत हो। वा(cid:29)त िवक मांग पूरा करना ह।ै वत(cid:23)मान म(cid:11) बाजार म(cid:11) मौजदू ा मांग क, तुलना म (cid:11) कम होगी। मांग को तदनसु ार कम ^कया जाना चािहए। (iii) हमारी अथ(cid:23)Wय व(cid:29)थ ा क, ऊजा(cid:23) िनभ(cid:23)रता धीरे धीरे कम हो रही ह।ै (iii) ऊजा(cid:23) तीŠता को nय ान म(cid:11) रखा संभािवत मांग का अनुमान लगाते समय गया ह।ै इस बात को nय ान म(cid:11) नहz रखा गया ह।ै इसे भी nय ान म(cid:11) रखा जाए। (iv) कोयले क, कमी को nय ान म(cid:11) रखत े (iv) सहमत नहz हो सकत े ह।L mए यह आवUय क ह ै ^क खपत क, िविभ2न Aेिणय] को *ाथिमकता दने े के िलए एक *णाली िवकिसत क, जाए और कम खपत वाले उपभो!त ाj से पहल े अिधक खपत करने वाले उपभो!त ाj क, मांग को पूरा करने के िलए एक *णाली तैयार क, जाए। (v) जल िव0ुत को कम काब(cid:23)न रणनीित के भाग के iप म(cid:11) बढ़ावा ^दया जा रहा (v) सहमत नहz हो सकते ह।L ह।ै हाइPो पावर से काब(cid:23)न उ(cid:12)स ज(cid:23)न थम(cid:23)ल पावर क, तुलना तीन गुना कम ह।ै (vi) पया(cid:23)वरण संबंधी बा‰ सम(cid:29)य ाj क, (vi) इस मुt े को अलग से उठाए अनदखे ी करने वाली वत(cid:23)मान नीित जाने क, आवUय कता ह।ै उ(cid:12)प ादक राKय ] के िलए भदे भावपूण(cid:23) ह ै !य ]^क पया(cid:23)वरण संबंधी अिधकांश लागत उ(cid:12)प ादक राKय ] rारा ही वहन क, जाती ह ै जब^क इसका लाभ खपत करने वाल े राKय ] को िमलता ह।ै36 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 8888.... सससस..ंं..ंं ((((ककककंंंंपपपपननननीीीी////ससससगगंंगगंं ठठठठनननन//// ZZZZयय यय िििि[[[[ 6666टटटट::::पप पप ििििणणणणयययय;;;; ककककाााा ससससााााररररााााशशंंशशंं हहहहममममाााारररराााा ददददििििृृृृ \\\\ककककोोोोणणणण////अअअअववववललललोोोोककककनननन ििििववववशशशशषषेेषषेे )))) सससस ेे ेे !!!!ाााा::::तत तत 6666टटटट::::पप पप ििििणणणणययययाााा ंं ंं ( vii) कुछ खान] म(cid:11) ^कया जा रहा (vii) संबD कोयला खदान] वाले थमल(cid:23) ह,ै सामा2य *^(cid:24)या के iप म (cid:11) ?ल ांट] के िलए यह आवUय क ह ै ^क व े अपनाने क, आवUय कता ह।ै खदान Oे- के आसपास पूरक वनीकरण कर(cid:11)। (viii) िविभ2न राKय ] म(cid:11) टीओडी (viii) ^दन के समय िव0ुत मू(cid:2)य के िलए मी टIरग और (cid:29)म ाट(cid:23) ि.ड संक(cid:2)प ना (cid:29)प `ट नीित बनाए जाने क, आवUय कता शुi क, जा रही ह।ै ह ै िजससे ^क गैस और जल िव0ुत पर लोड कम ^कया जा सके। ( (ix) जल िव0ुत ?ल ांट] के िलए लागत ix) टीईसी के िलए क(cid:11)िव*ा म(cid:11) आधा(cid:8)रत (?ल स) टै(cid:8)रफ के *ा?त सभी प(cid:8)रयोजनाj के िलए प(cid:8)रणाम(cid:29)व iप संपूण(cid:23) पूंजीगत लागत लागत अनुमान] क, जांच बच(cid:11) माक(cid:23) कम हो रही ह।ै यह सुझाव ^दया जाता ह ै क,मत] के आधार पर क, जाती ह।ै ^क लेखापरीOा *णाली अथवा ब(cid:11)चमाक(cid:23) *ाइQसग *णाली शुi क, जाए। 10. ि(cid:29)पक इलेि!<क पावर 12वz पंचवषVय योजना के दौरान प(cid:8)रयोजनाj के शे(cid:2)फ म(cid:11) शािमल कॉपSरेशन (*ा.) तूतीकोरन चरण-IV म(cid:11) 1x525 मेगावाट ^कया जा सकता ह।ै िलिमटेड टीपीएस प(cid:8)रयोजना को शािमल ^कया गया। 11. ती(cid:29)त ा हाइPो पावर 12वz पंचवषVय योजना सचू ी म(cid:11) उ(cid:12)त री इसके िलए ईसी अभी *ा?त ^कया िलिमटेड िस^†म म(cid:11) भीम!य ]ग हाइPो पावर जाना ह।ै जनू , 2016 तक इसक, प(cid:8)रयोजना (99 मेगावाट) को शािमल (cid:29)थ ापना का बmत ही मह(cid:12)व ाकांOी लsय ह।ै इस प(cid:8)रयोजना को 12वz ^कया जाए। पंचवषVय योजना के शे(cid:2)फ म(cid:11) शािमल ^कया जा सकता ह।ै 12 पीटीसी (i) अि.म तौर पर 12वz पंचवषVय (i) 12वz पंचवषVय योजना के योजना के लsय ] को पहल े ही िनधा(cid:23)(cid:8)रत लsय ] को योजना आयोग rारा ^कया जाए िजससे ^क लsय को पूरा अंितम iप ^दया जा रहा ह।ै करन े के िलए िव0ुत कंपिनयां समय पर कार(cid:23)वाई कर सक(cid:11)। (ii) िवतरण के Oे- म(cid:11) राKय ] को (ii) संपूण(cid:23) िव0ुत Oे- क, वािणिKयक मह(cid:12)व पूण(cid:23) भूिमका िनभानी होती Wय वहाय(cid:23)ता के िलए िवतरण Oे- पर ह।ै िवशेष iप से nय ान ^दया जाए।¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 37 8888.... सससस..ंं..ंं ((((ककककंंंंपपपपननननीीीी////ससससगगंंगगंं ठठठठनननन//// ZZZZयय यय िििि[[[[ 6666टटटट::::पप पप ििििणणणणयययय;;;; ककककाााा ससससााााररररााााशशंंशशंं हहहहममममाााारररराााा ददददििििृृृृ \\\\ककककोोोोणणणण////अअअअववववललललोोोोककककनननन ििििववववशशशशषषेेषषेे )))) सससस ेे ेे !!!!ाााा::::तत तत 6666टटटट::::पप पप ििििणणणणययययाााा ंं ंं (iii) आयोजना एक,कृत ऊजा(cid:23) नीित के (iii) गैस क, अनुपल7ध ता को अनुसार क, जानी चािहए और ऊजा (cid:23) nय ान म(cid:11) रखत े mए पहले स े िमAण म(cid:11) गैस क, अिधक िह(cid:29)स ेदारी पर िनमा(cid:23)णाधीन ?ल ांट] को छोड़कर िवचार ^कया जाना चािहए। 12वz पंचवषVय योजना के िलए ^कसी भी गैस आधा(cid:8)रत पावर ?ल ांट क, योजना नहz बनाई गई ह।ै (iv) गैस/कोयला आधा(cid:8)रत प(cid:8)रयोजनाj (iv) बोली द(cid:29)त ावेज] म(cid:11) िव0ुत के पीपीए क, अविध 15-18 वष(cid:23) रखन े के मं-ालय rारा आवUय क सशं ोधन बजाय Mधन आपू(cid:21)त करार के अनुसार ^कए जा रह े ह।L िनधा(cid:23)(cid:8)रत क, जानी चािहए और अnय ाय 14 के अनGु छ ेद 6.4 म(cid:11) आवUय क संशोधन ^कया जाना चािहए। (v) *ितयोगी बोली *^(cid:24)या के ज(cid:8)रए (v) िव0ुत Oे- क, सम(cid:29)य ाj, आवं(cid:8)टत प(cid:8)रयोजनाj के समO Mधन क, िवशेष iप से Mधन संबंधी मुt] सम(cid:29)य ाj के साथ साथ अ2य पहलुj स े को एनईपी म (cid:11) शािमल ^कया गया जुड़ी सम(cid:29)य ाए ं ह L अत: एनईपी म(cid:11) उनका ह।ै समाधान ^कया जाना चािहए। (vi) जलाशय *कार क, जल िव0ुत (vi) जलाशय पर आधा(cid:8)रत जल प(cid:8)रयोजनाj पर जोर ^दया जाए और िव0ुत ?ल ांट को बढ़ावा दने े के आर ए@ड आर संबंधी सम(cid:29)य ाj को हल िलए Wय व(cid:29)थ ा म(cid:11) अित(cid:8)र!त ^कया जाए। साम.ी और आर ए@ड आर संबंधी मुt] को शािमल ^कया जाए। (vii) पंप (cid:29)ट ोरेज ?ल ांट] (पीएसपी) (vii) यथाWय वहाय(cid:23) सीमा तक प(cid:8)रयोजनाj क, संभावनाj का बेहतर पीएसएस ?ल ांट] क, आयोजना ढंग से सदपु योग ^कया जाना चािहए। तैयार क, जा रही ह।ै वत(cid:23)मान म(cid:11) इसका केवल 5% ही उपयोग ^कया जा रहा ह।े (viii) उन कारण] क, जाचं क, जानी (viii) डीएसएम उपाय] के चािहए ^क डीएसएम संबंधी उपाय] का काया(cid:23)2व यन म(cid:11) राKय ] को स^(cid:24)य अपेOा से कम/काया(cid:23)2व यन !य ] नहz भूिमका िनभानी होगी।38 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 8888.... सससस..ंं..ंं ((((ककककंंंंपपपपननननीीीी////ससससगगंंगगंं ठठठठनननन//// ZZZZयय यय िििि[[[[ 6666टटटट::::पप पप ििििणणणणयययय;;;; ककककाााा ससससााााररररााााशशंंशशंं हहहहममममाााारररराााा ददददििििृृृृ \\\\ककककोोोोणणणण////अअअअववववललललोोोोककककनननन ििििववववशशशशषषेेषषेे )))) सससस ेे ेे !!!!ाााा::::तत तत 6666टटटट::::पप पप ििििणणणणययययाााा ंं ंं ^कया जा रहा ह।ै 13. एमबी पावर 12वz पंचवषVय योजना म(cid:11) छ(cid:12)त ीसगढ़ हम प(cid:8)रयोजनाj के शे(cid:2)फ म(cid:11) इस े (छ(cid:12)त ीसगढ़) िलिमटेड 2x660 मेगावाट टीपीएस को शािमल शािमल कर सकते ह।L करने के िलए अनरु ोध ^कया ह।ै 14. लाचुंग हाइPो पावर 12वz पंचवषVय योजना म(cid:11) नॉथ(cid:23) िस^†म ईसी अभी *ा?त नहz mआ ह।ै *ाइवेट िलिमटेड क, 99वे मेगावाट लाचुंग हाइPो 12वz पंचवषVय योजना के िलए प(cid:8)रयोजना को शािमल ^कया जाए। मह(cid:12)व ाकांOी लsय ह।ै हम इस े प(cid:8)रयोजनाj के शे(cid:2)फ म(cid:11) शािमल कर सकते ह।L 15 पावर (cid:8)रसच(cid:23) ए@ड एनईपी के िविभ2न अnय ाय] म(cid:11) ^कए गए अवलोकन]/सुझाव] को उपयु!त डवलपम(cid:11)ट कंस(cid:2)ट (cid:11)dस बmत से सुधार/सुझाव *ाय: वत(cid:23)नी संबंधी ढंग से शािमल ^कया जाए *ाइवेट िलिमटेड -ु(cid:8)टय], डटे ा अ0तनीकरण, पेज fेक, टेबल नंबIरग स े संबंिधत ह।L कुछ (cid:8)ट?प िणयां िन:न ानसु ार ह L : (i) मांग पूवा(cid:23)नुमान लगाने के िलए आ(cid:21)थक गणना पर आधा(cid:8)रत पहल पर िवचार ^कए जाने क, आवUय कता ह।ै (ii) 12वz एवं 13वz पंचवषVय योजना के िलए मांग के संबंध म(cid:11) घ(cid:8)टया प(cid:8)रदUृ य *(cid:29)त ुत ^कया गया ह ै और वह दोन] के िलए समान ह।ै अत: इसम(cid:11) संशोधन ^कया जाए। (iii) भाग 4.3 (पेज 57) म(cid:11) ^दए अनुसार िवत(cid:8)रत उ(cid:12)प ादन को लोड स(cid:11)टर के पास नहz होना चािहए। (iv) पवन ऊजा(cid:23) क, लागत कोयला आधा(cid:8)रत उ(cid:12)प ादन के समतु(cid:2)य ह ै परंत ु अ2य गैर पारंप(cid:8)रक मामल] म(cid:11) इसे उ(cid:12)प ादन के अ2य *कार के iप म(cid:11) माना गया ह ै (भाग 5.2.2, पेज 92)। (v) पी‡कग ?ल ांट लोड स(cid:11)टर के पास नहz होना चािहए (पेज 92 और 231)। (vi) ि.ड कोड से एलओएलपी 2% ह।ै¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 39 8888.... सससस..ंं..ंं ((((ककककंंंंपपपपननननीीीी////ससससगगंंगगंं ठठठठनननन//// ZZZZयय यय िििि[[[[ 6666टटटट::::पप पप ििििणणणणयययय;;;; ककककाााा ससससााााररररााााशशंंशशंं हहहहममममाााारररराााा ददददििििृृृृ \\\\ककककोोोोणणणण////अअअअववववललललोोोोककककनननन ििििववववशशशशषषेेषषेे )))) सससस ेे ेे !!!!ाााा::::तत तत 6666टटटट::::पप पप ििििणणणणययययाााा ंं ंं जब^क हम 1% एलओएलपी अपना रह े ह L और 0.15% ईएनएस का स(cid:12)य ापन करने क, आवUय कता ह।ै (vii) 800/600 मेगावाट और 500/250/210/200 मेगावाट Oमता वाली यूिनट] के िलए कोयला आधा(cid:8)रत यूिनट] के पीएलएफ को 85% तक संशोिधत ^कया जा सकता ह ै (भाग 6.3.6 पेज 105)। (viii) आरिOत मा(cid:21)जन श7द के बदले म (cid:11) आरिOत Oमता श7द का इ(cid:29)त ेमाल ^कया गया (पेज नं.224)। 16 टाटा *ोजे!ट िलिमटेड ईपीसी कायF के िलए बोली हते ु पा- इस मुt े को अलग से उठाया जाए। घोिषत ^कए जाने के संबंध म (cid:11) बोलीदाताj के िलए पूव(cid:23) अहत(cid:23) ा मानदडं ] म(cid:11) संशोधन करन े का सुझाव ^दया गया ह।ै 17 ह(cid:8)रयाणा पावर 12वz पंचवषVय योजना म (cid:11) ईसी अभी *ा?त ^कया जाना ह।ै जनरेशन कंपनी डीसीआरटीपीपी rारा 1x660 मेगावाट प(cid:8)रयोजनाj के शे(cid:2)फ म(cid:11) इस े िलिमटेड शािमल ^कया जा सकता ह।ै िव(cid:29)त ार प(cid:8)रयेाजना को शािमल ^कया जाए। 18 यूपी पावर <ां सिमशन लिलतपुर टीपीएस (3x660), भोगनीपुर योजना आयोग rारा िनधा(cid:23)(cid:8)रत कॉपSरेशन िलिमटेड ^कए गए लsय के अनुसार 12वz टीपीएस-1 (2x660+2x660 मेगावाट), पंचवषVय योजना के दौरान संडीता टीपीएस (2x660), मेजा II (cid:29)थ ापना हते ु िजन प(cid:8)रयोजनाj (2x660) घाटमपुर (3x660 मेगावाट), क, योजना बनाई गई ह,ै केवल उ2ह (cid:11) ही 12वz योजना सचू ी म (cid:11) जवाहरपुर (3x660) को 12वz एव ं शािमल ^कया जा सकता ह।ै 13वz पंचवषVय योजनाj म(cid:11) शािमल हालां^क उ(cid:12)त र *दशे rारा िजन ^कया जाए। प(cid:8)रयोजनाj क, योजना बनाई गई ह,ै को प(cid:8)रयोजनाj के शे(cid:2)फ म(cid:11) शािमल ^कया जा सकता ह।ै 19. Qसदया पावर िसका(cid:23)झी, तिमलनाडु म(cid:11) 2x660 मेगावाट ईसी अभी *ा?त ^कया जाना ह।ै इसे प(cid:8)रयोजनाj के शे(cid:2)फ म (cid:11) कॉ(cid:29)ट र आधा(cid:8)रत टीपीएस को 12वz एव ं शािमल ^कया जा सकता ह।ै 13वz योजना सूची म(cid:11) शािमल ^कया जाए।40 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 8888.... सससस..ंं..ंं ((((ककककंंंंपपपपननननीीीी////ससससगगंंगगंं ठठठठनननन//// ZZZZयय यय िििि[[[[ 6666टटटट::::पप पप ििििणणणणयययय;;;; ककककाााा ससससााााररररााााशशंंशशंं हहहहममममाााारररराााा ददददििििृृृृ \\\\ककककोोोोणणणण////अअअअववववललललोोोोककककनननन ििििववववशशशशषषेेषषेे )))) सससस ेे ेे !!!!ाााा::::तत तत 6666टटटट::::पप पप ििििणणणणययययाााा ंं ंं 20. िव0ुत उ(cid:12)प ादक संघ (i) एफएसए पर ह(cid:29)त ाOर – यह एफएसए, पीपीए, मानक बोली द(cid:29)त ावेज] म(cid:11) संशोधन, Mधन क, सुिनिgत ^कए जाने क, आवUय कता ह ै कमी। ई और एफ संबंधी ^क 31.3.2015 तक सथ ् ािपत ^कए जान े (cid:29)व ीकृितयां ज(cid:2)द ी *ा?त करन े वाले ?ल ांट] के िलए एफएसए पर आ^द से संबंिधत एपीपी rारा ह(cid:29)त ाOर ?ल ांट क, (cid:29)थ ापना से कम स े उठायी गई सम(cid:29)य ाj / ^दए गए कम एक माह पहले हो जाने चािहए। बmत से सुझाव] का समाधान (ii) एफएसए पर ह(cid:29)त ाOर के िलए उपयु!त फोरम] पर ^कए जाने क, पीपीए क, पूव(cid:23) शत(cid:23) :- नए मॉडल आवUय कता ह।ै एफएसए के अनुसार करार पर ह(cid:29)त ाOर करने के िलए दीघ(cid:23)कािलक पीपीए एक इन मुt] का अलग से समाधान अिनवाय(cid:23) आवUय कता ह।ै हालां^क ^कया जा सकता ह।ै कोयला संपक(cid:23) के अिधिनण(cid:23)य के समय इस बात को नोट ^कया जाए ^क िवतरण कंपिनय] के साथ दीघ(cid:23)कािलक पीपीए क, संपादक,य प(cid:8)रवत(cid:23)न उपयु!त ढंग कोई आवUय कता / शत (cid:23) अिनवाय(cid:23) नहz से ^कए जाए।ं थी। इसके अलावा आUव ासन के प- म (cid:11) भी ऐसी कोई शत(cid:23)/आवUय कता अिनवाय (cid:23) नहz बनाई गई। जब भारी मा-ा म(cid:11) िनवेश ^कया गया ह ै और उपयु(cid:23)!त आधार पर संिवदाj म(cid:11) ह(cid:29)त ाOर ^कए गए ह,L तो ऐसी ि(cid:29)थित म (cid:11) यह अनुिचत होगा ^क एफएसए पर ह(cid:29)त ाOर के िलए एक पूव(cid:23) शत(cid:23) के iप म (cid:11) दीघ(cid:23)कािलक पीपीए पर ह(cid:29)त ाOर करने क, शत (cid:23) लगाई जाए। एफएसए को अलग से शत (cid:23) के iप म(cid:11) लाग ू नहz ^कया जाना चािहए बि(cid:2)क इसे एलओए और एलओए म(cid:11) िव(cid:29)त ार दी गई गई शतF के समान बनाया जाना चािहए। (iii) घाटे क, वत(cid:23)मान ि(cid:29)थित के आलोक म(cid:11) य^द पीपीए क, आवUय कता को बनाए रखा जाता ह,ै तो कोई भी प(cid:8)रयोजना क, (cid:29)थ ापना के Wय य को वहन नहz कर सकता ह,ै बि(cid:2)क पीपीए के अभाव म(cid:11) वह िव0ुत क, आपू(cid:21)त करन े म(cid:11) सOम नहz होगा। ऐसी ि(cid:29)थित म(cid:11) िवकासकता(cid:23) यह *(cid:29)त ाव दते े ह L ^क िज2ह ]ने अभी तक पीपीए पर ह(cid:29)त ाOर नहz ^कए ह,L परंत ु उ2ह ]ने प(cid:8)रयोजना (cid:29)थ ािपत/आंिशक iप से (cid:29)थ ािपत/*गित क, ह,ै उनको वत(cid:23)मान म(cid:11) सीआईएल के साथ एफएसए पर¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 41 8888.... सससस..ंं..ंं ((((ककककंंंंपपपपननननीीीी////ससससगगंंगगंं ठठठठनननन//// ZZZZयय यय िििि[[[[ 6666टटटट::::पप पप ििििणणणणयययय;;;; ककककाााा ससससााााररररााााशशंंशशंं हहहहममममाााारररराााा ददददििििृृृृ \\\\ककककोोोोणणणण////अअअअववववललललोोोोककककनननन ििििववववशशशशषषेेषषेे )))) सससस ेे ेे !!!!ाााा::::तत तत 6666टटटट::::पप पप ििििणणणणययययाााा ंं ंं ह(cid:29)त ाOर करन े क, अनुमित इस शत (cid:23) के अनुसार *दान क, जाए ^क एफएसए के अनुसार कोयला क, वा(cid:29)त िवक आपू(cid:21)त म(cid:11) पीपीए पर ह(cid:29)त ाOर हो जाने के पUच ात अपेिOत तेजी लाई जाएगी। (iv) *ितयोगी बोली *^(cid:24)या के अवसर] क, कमी रही ह।ै इस बात को नोट ^कया जाए ^क ऐसे बmत से राKय ह L िज2ह ]न े यहां तक ^क बोिलयां भी आमंि-त नहz क, ह L और दिOण Oे- म(cid:11) घाटे के बावजूद भी अभी तक एक भी बोली पूरी नहz क, गई ह।ै यह अिनवाय(cid:23) ह ै ^क ऐसी ि(cid:29)थितयां िन(cid:21)मत क, जाए ं जो राKय ] को िव0ुत खरीद बोिलयां आमंि-त करने म (cid:11) समथ(cid:23) बना सक(cid:11), िजसस े ^क ऐसी प(cid:8)रयोजनाए ं िजनक, (cid:29)थ ापना पहल े ही कर दी गई ह ै अथवा िनकट भिव`य म(cid:11) िजनक, (cid:29)थ ापना होने वाली ह,ै उनके िलए पीपीए पर ह(cid:29)त ाOर ^कए जा सक(cid:11)। हालां^क, मामला 1 बोली *^(cid:24)या अवसर] क, कमी को nय ान म(cid:11) रखत े mए ऐसी बmत सी प(cid:8)रयोजनाए ं ह,L िजनक, (cid:29)थ ापना होने वाली ह ै और उनके पास एलओए उपल7ध ह,ै परंतु वे पीपीए के अभव म(cid:11) िव0ुत उ(cid:12)प ादन म(cid:11) सOम नहz ह]गz। िव0ुत क, गंभीर कमी वाली ऐसी ि(cid:29)थित म(cid:11) सुलभ समाधान यह ह ै ^क ऐसी प(cid:8)रयोजनाj को धारा 62 के अंतगत(cid:23) टै(cid:8)रफ िनधा(cid:23)रण के िलए सबं ंिधत राKय और िनयामक] से पहल करन े क, अनुमित *दान क, जाए, ता^क उ2ह (cid:11) कोयला *ा?त होने लगे और िव0ुत का उ(cid:12)प ादन शुi ^कया जा सके। (v) नए एफएसए म(cid:11) वा(cid:29)त िवक प(cid:8)रवत(cid:23)न क) कम से कम 80% िनधा(cid:23)(cid:8)रत कोयला आवUय कता ख) माच(cid:23), 2009 के पहले ह(cid:29)त ाO(cid:8)रत एफएसए को यथावत रखने क, आवUय कता ह।ै42 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 8888.... सससस..ंं..ंं ((((ककककंंंंपपपपननननीीीी////ससससगगंंगगंं ठठठठनननन//// ZZZZयय यय िििि[[[[ 6666टटटट::::पप पप ििििणणणणयययय;;;; ककककाााा ससससााााररररााााशशंंशशंं हहहहममममाााारररराााा ददददििििृृृृ \\\\ककककोोोोणणणण////अअअअववववललललोोोोककककनननन ििििववववशशशशषषेेषषेे )))) सससस ेे ेे !!!!ाााा::::तत तत 6666टटटट::::पप पप ििििणणणणययययाााा ंं ंं ग) एफएसए पर ह(cid:29)त ाOर स े पहले पीपीए ^(cid:24)याि2वत करन े क, आवUय कता पर मामला-1 अवसर] के अभाव को nय ान म(cid:11) रखते mए िवचार ^कए जान े क, आवUय कता ह ै और जब तक िव0तु मं-ालय rारा अविश`ट मू(cid:2)य संबंधी मुt] का समाधान नहz कर िलया जाता ह,ै तब तक िनिgत iप स े इस नीित को बनाए रखा जाना चािहए। सबसे खराब ि(cid:29)थित म(cid:11) य^द एफएसए के अंतगत(cid:23) कोयले क, आपू(cid:21)त समझौते के अनुiप िनधा(cid:23)(cid:8)रत Oमता के अनुसार हो जाती ह,ै तो दीघ(cid:23)कालीन पीपीए को बनाए रखा जाना चािहए। (vi) मच‚ट ?ल ाट] पर एक (cid:29)प `ट नीित होनी चािहए !य ]^क संपूण(cid:23) दशे म(cid:11) मच‚ट ?ल ांट] क, (cid:29)थ ापना क, जा रही ह।ै य^द दीघ(cid:23)कािलक पीपीए क, पूव(cid:23) शत(cid:23) के कारण उ2ह (cid:11) बाद म(cid:11) Mधन क, आपू(cid:21)त बंद कर दी जाती ह,ै तो प(cid:8)रयोजना के बंद होन े का खतरा पैदा हो जाएगा। (vii) एफएसए के अनुसार 80% आवUय क कोयले क, आपू(cid:21)त क, जाती ह ै और आयात ^कए गए कोयले को 86% पीएलएफ पर ?ल ांट *चािलत करने के िलए िमिAत ^कया जाता ह।ै अिधक प(cid:8)रवतV लागत के कारण िव0तु कंपिनयां उसका भुगतान करने म (cid:11) समथ (cid:23) नहz ह/L उसका भुगतान नहz करना चाहती ह।L नए और पुराने पीपीए म (cid:11) Mधन क, लागत को शािमल करने के िलए 7ल LQडग पर सु(cid:29)प `ट नीित क, िसफा(cid:8)रश क, जानी चािहए। (viii) रा`< ीय टै(cid:8)रफ नीित के अनुसार 1 जनवरी, 2011 से िव0तु क, खरीद *ितयोगी बोली *^(cid:24)या के ज(cid:8)रए क,¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 43 8888.... सससस..ंं..ंं ((((ककककंंंंपपपपननननीीीी////ससससगगंंगगंं ठठठठनननन//// ZZZZयय यय िििि[[[[ 6666टटटट::::पप पप ििििणणणणयययय;;;; ककककाााा ससससााााररररााााशशंंशशंं हहहहममममाााारररराााा ददददििििृृृृ \\\\ककककोोोोणणणण////अअअअववववललललोोोोककककनननन ििििववववशशशशषषेेषषेे )))) सससस ेे ेे !!!!ाााा::::तत तत 6666टटटट::::पप पप ििििणणणणययययाााा ंं ंं जानी ह।ै िवकासकता (cid:23) 25 वष(cid:23) के िलए प@य व(cid:29)त ु मू(cid:2)य और इससे जुड़ े जोिखम को बदा(cid:23)Uत नहz कर सकता ह।ै अत: नए मानक बोली द(cid:29)त ावेज] म(cid:11) Mधन क, लागत को अिनवाय (cid:23) iप से शािमल ^कया जाना चािहए। गैस आधा(cid:8)रत पावर प(cid:8)रयोजनाj से िव0ुत क, खरीद के िलए अलग बोली द(cid:29)त ावेज अिधस ूिचत ^कए जाने क, आवUय कता ह ै !य ]^क इन प(cid:8)रयोजनाj के जोिखम कोयला आधा(cid:8)रत प(cid:8)रयोजनाj क, तुलना म (cid:11) काफ, अलग ह।L (ix) ई और एफ (cid:29)व ीकृितय] म(cid:11) तेजी लाना : उपल7ध ऊजा(cid:23) पर कोयले क, अनुपल7ध ता के बड़ े *भाव को nय ान म (cid:11) रखते mए िव0ुत मू(cid:2)य (जो कोयला क, लगातार कमी के कारण और अिधक बढ़ सकता ह)ै , के साथ साथ पजूं ी लागत भी बढ़ जाएगी। यह िनतातं आवUय क ह ै ^क कोयला धारक Oे-] को आवUय क सुरOा उपाय] के साथ वन संबंधी (cid:29)व ीकृित शी‹ *दान क, जाए। *^(cid:24)यागत िवलंब को कम करने क, आवUय कता ह ै परंतु सुरOा उपाय] के साथ कोई समझौता न ^कया जाए। जहा ं एक ओर नो-गो नीित को हटाए जाने जैसी कार(cid:23)वाई क, जाती ह,ै वहz दसू री ओर कोयला 7ल ॉक] के साथ साथ िव0ुत प(cid:8)रयोजनाj के िलए ई और एफ (cid:29)व ीकृितय] के संबंध म(cid:11) समानांतर iप से आवUय क कार(cid:23)वाई करने क, अनुमित *दान क, जाती ह।ै अभी भी कुछ ऐसी प(cid:8)रयोजनाए ं ह L जो पूव(cid:23)वतV नो-गो Oे-] म(cid:11) आती ह,L उनके संबंध म(cid:11) शी‹ (cid:29)व ीकृितया ं *दान ^कए जाने क, आवUय कता ह।ै 21 अथेना पावर िलिमटेड प(cid:8)रयोजना का नाम ‘’अथेना छ(cid:12)त ीसगढ़ हम प(cid:8)रयोजना के नाम और पावर िलिमटेड’’ – 600 मेगावाट करन े (cid:29)थ ािपत Oमता म(cid:11) प(cid:8)रवत(cid:23)न के िलए सहमत ह।L के िलए अनुरोध ^कया गया ह।ै Aी एन. *दीप कुमार, एनईपी म(cid:11) बmत सी टंकण सबं ंधी -ु(cid:8)टय], सुझाव/संशोधन] को उपयु!त ढंग पावर कंपनी ऑफ संरेखण -ु(cid:8)टय] और कुछ अ2य सुधार] के से शािमल ^कया गया ह।ै कना(cid:23)टक िलिमटेड िलए सुझाव ^दया गया ह।ै44 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 8888.... सससस..ंं..ंं ((((ककककंंंंपपपपननननीीीी////ससससगगंंगगंं ठठठठनननन//// ZZZZयय यय िििि[[[[ 6666टटटट::::पप पप ििििणणणणयययय;;;; ककककाााा ससससााााररररााााशशंंशशंं हहहहममममाााारररराााा ददददििििृृृृ \\\\ककककोोोोणणणण////अअअअववववललललोोोोककककनननन ििििववववशशशशषषेेषषेे )))) सससस ेे ेे !!!!ाााा::::तत तत 6666टटटट::::पप पप ििििणणणणययययाााा ंं ंं 23 नीपको (i) 12वz पंचवषVय योजना के िलए (i) नीपको rारा *(cid:29)त ािवत नीपको rारा तैयार क, गई योजनाए ं प(cid:8)रयेाजनाj को प(cid:8)रयोजनाj एनईपी के अनुiप ह।L तथािप 13वz क, सूची म(cid:11) शािमल ^कया जा पंचवषVय येाजना के िलए कुल 1851 सकता ह।ै मेगावाट Oमता वाली अ2य प(cid:8)रयोजनाj को 13वz योजना सूची म (cid:11) शािमल ^कया जाना चािहए। (ii) केवल ऐसी प(cid:8)रयोजनाj को (ii) 46 मेगावाट एजीटीपी संयु!त च(cid:24) 12वz योजना सचू ी म(cid:11) शािमल िव(cid:29)त ार प(cid:8)रयोजना को 12वz योजना ^कया गया ह ै िजनके िलए गैस सूची म(cid:11) शािमल करन े के िलए अनुरोध आपू(cid:21)त सुिन िgत ह।ै ^कया गया ह।ै (iii) पूवा(cid:23)(cid:12)त र Oे- म (cid:11) आर ए@ड एम (iii) अ0तन ^कया जा रहा ह।ै प(cid:8)रयोजनाj से संबंिधत अ0तन सूचना उपल7ध कराई गई ह ै और उसे एनईपी म(cid:11) तदनुसार अ0तन करने के िलए अनुरोध ^कया गया ह।ै 24 एनएचपीसी िलिमटेड (i) 11वz पंचवषVय योजना म (cid:11) जल (i) हम एनईपी म(cid:11) उपयु!त ढंग स े िव0ुत प(cid:8)रयोजनाj के काया(cid:23)2व यन म(cid:11) इ2ह (cid:11) शािमल कर सकते ह L और िवलंब के िलए कुछ बड़ े मुt] / Qचताj, एनएचपीसी क, प(cid:8)रयोजनाj क, कारण] पर बmत से सुझाव ^दए गए और ि(cid:29)थित को अ0तन ^कया जा 12वz पंचवषVय योजना म (cid:11) जल िव0ुत सकता ह।ै िवकास म(cid:11) तजे ी लाने के िलए कुछ उपाय सुझाए गए ह।L (ii) चूं^क अब 11वz पंचवषVय (ii) *ितवेदन ^दया गया ह ै ^क 12वz योजना अविध समा?त हो गई ह।ै पंचवषVय योजना सूची म(cid:11) एनएचपीसी अत: िजन प(cid:8)रयोजनाj क, िलिमटेड क, तीन प(cid:8)रयाजनाए ं शािमल िनधा(cid:8)(cid:23) रत ितिथ िनकल गई उ2ह (cid:11) क, जाए।ं हालां^क ऐसी प(cid:8)रयोजनाj 12वz योजना म(cid:11) सूचीबD ^कया को सचू ीबD नहz ^कया जा सकता ह,ै जा सकता ह।ै िजनक, िनधा(cid:23)(cid:8)रत ितिथ िनकल गई ह।ै (iii) एनएचपीसी न े 12वz पंचवषVय (iii) 12वz योजना क, योजना के िलए 4480 मेगावाट Oमता प(cid:8)रयोजनाए ं योजना आयोग के लsय के अनुसार ह।L वाली जल िव0ुत प(cid:8)रयाजनाj क, सूची उपल7ध कराई ह ै और अनुरोध ^कया ह ै ^क इ2ह (cid:11) 12वz योजना सूची म(cid:11) शािमल ^कया जाए।¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 45 8888.... सससस..ंं..ंं ((((ककककंंंंपपपपननननीीीी////ससससगगंंगगंं ठठठठनननन//// ZZZZयय यय िििि[[[[ 6666टटटट::::पप पप ििििणणणणयययय;;;; ककककाााा ससससााााररररााााशशंंशशंं हहहहममममाााारररराााा ददददििििृृृृ \\\\ककककोोोोणणणण////अअअअववववललललोोोोककककनननन ििििववववशशशशषषेेषषेे )))) सससस ेे ेे !!!!ाााा::::तत तत 6666टटटट::::पप पप ििििणणणणययययाााा ंं ंं (iv) जल िव0ुत िवकास म(cid:11) तेजी लाने के (iv) एनएचपीसी rारा *(cid:29)त ािवत िलए बmत से सुझाव जैस े जल िव0ुत सुझाव] को उपयु!त फोरम पर प(cid:8)रयोजनाj के िलए पया(cid:23)वरण एवं वन उठाया जा सकता ह।ै तथा व2य जीव (cid:29)व ीकृितया ं *दान करन े के िलए एकल िखड़क, *णाली, िवकासा(cid:12)म क/डीपीआर से सबं ंिधत कायF, नदी बेिसन का संिचत *भाव अnय यन, नदी बेिसन इ`ट तमीकरण अnय यन, नदी बेिसन म(cid:11) अवसंरचना िवकास, धनाŒ राKय ] म(cid:11) जल िव0ुत उप(cid:29)क र] क, िविनमा(cid:23)ण यूिनट] क, (cid:29)थ ापना, पूवS(cid:12)त र Oे- से िव0ुत िन`(cid:24) मण के िलए रा`< ीय ि.ड, पूवS(cid:12)त र Oे- म(cid:11) अि.म iप से पूरक वनीकरण आ^द के सचं ालन हते ु पहल े स े तथा अलग स े वन संबंधी (cid:29)व ीकृित आ^द सुझाव ^दए गए ह।L (v) समुिचत कार(cid:23)वाई सुिनिgत (v) वन भूिम के प(cid:8)रवत(cid:23)न क, लागत का क, जाए मू(cid:2)य ांकन करने के िलए इसके अप(cid:141)ंट भुगतान और इसके िनवल वत(cid:23)मान मू(cid:2)य (एनपीवी) क, समीOा ^कए जान े क, समीOा ह ै !य ]^क इसके कारण जल िव0ुत योजनाj के भंडारण हते ु उन पर बड़ा िव(cid:12)त ीय बोझ पड़ता ह ै और प(cid:8)रयोजनाए ं आकषक(cid:23) नहz रह जाती ह।L इसके िलए उपयु!त नितगत प(cid:8)रवत(cid:23)न आवUय क ह।L (vi) नई जल िव0ुत नीित को (vi) िनजी िवकासकता(cid:23)j क, सम(cid:29)य ाj nय ान म(cid:11) रखते mए बड़ी जल को nय ान म(cid:11) रखत े mए बड़ी जल िव0तु िव0ुत प(cid:8)रयोजनाए ं पीएसयू के प(cid:8)रयोजनाj का िवकास केवल पीएसयू िलए आरिOत करना क(cid:8)ठन *तीत के माnय म स े ^कया जाना चािहए ता^क होता ह।ै िव0ुत क, लागत के संबंध म(cid:11) जवाबदहे ी तय क, जा सके, पया(cid:23)वरण संबंधी जागiकता, (cid:29)थ ानीय जनता और अंितम *यो!त ाj के लाभ सुिनिgत ^कए जा सक(cid:11)। 25 आशा पावर कॉपSरेशन (i) कंपनी क, 35 मेगावाट Oमता वाली ऐसी गैस प(cid:8)रयोजनाj को 12वz *ाइवेट िलिमटेड योजना सूची म(cid:11) शािमल ^कया गैस आधा(cid:8)रत प(cid:8)रयोजना, िजसका गया ह ै िजनके िलए (cid:29)थ ानीय (cid:29)त र िनमा(cid:23)ण उ2न त चरण पर ह,ै को 11वz पर सुदढ़ृ Mधन संपक(cid:23) (cid:29)थ ािपत ह।L योजना म(cid:11) शािमल ^कया जाए। (ii) 12वz योजना के अंतग(cid:23)त 646 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 8888.... सससस..ंं..ंं ((((ककककंंंंपपपपननननीीीी////ससससगगंंगगंं ठठठठनननन//// ZZZZयय यय िििि[[[[ 6666टटटट::::पप पप ििििणणणणयययय;;;; ककककाााा ससससााााररररााााशशंंशशंं हहहहममममाााारररराााा ददददििििृृृृ \\\\ककककोोोोणणणण////अअअअववववललललोोोोककककनननन ििििववववशशशशषषेेषषेे )))) सससस ेे ेे !!!!ाााा::::तत तत 6666टटटट::::पप पप ििििणणणणययययाााा ंं ंं अित(cid:8)र!त गैस इंजन और एक एसटीजी शािमल ^कया जाए 26 एमपी पावर मैनेजम(cid:11)ट कोई (cid:8)ट?प णी नहz कंपनी िलिमटेड 27 ड7(cid:2) य ू.बी. (cid:29)ट ेट ड7(cid:2) य ूबीएसईडीसीएल क, प(cid:8)रयोजनाj हम सहमत ह।L इलेि!<िसटी के संबंध म(cid:11) डटे ा अ0तनीक,रण/आर ए@ड िड(cid:29)< ी7य ूशन कंपनी एम क, ि(cid:29)थित स े अवगत कराया गया ह ै िलिमटेड और एनईपी म(cid:11) उसे अ0तन करने का अनुरोध ^कया गया ह।ै 28 शंकर शमा(cid:23), िव0ुत (i) पया(cid:23)?त मा-ा म(cid:11) Mधन सुिनिgत करन े (i) क(cid:11)3ीय िव0ुत *ािधकरण और नीित िवUल ेषक म(cid:11) क(cid:8)ठनाई, भूिम अिध.हण संबंधी योजना आयोग rारा Oमता सम(cid:29)य ाए,ं बड़ े पैमाने पर िव(cid:29)थ ापन के अिभवृिD काय(cid:23)(cid:24)म के िलए लsय िलए (cid:29)थ ानीय लोग] का िवरोध और िनधा(cid:23)(cid:8)रत करत े समय इन लोग] के बीच पया(cid:23)वरण के संबंध म(cid:11) सम(cid:29)य ाj पर िवचार ^कया गया अपेिOत (cid:29)त र क, जागiकता न होने स े ह।ै उGच Oमता अिभवृिD के लsय ] को *ा?त करने म(cid:11) सदवै बाधाएं बनी रहग(cid:11) ी। अत: भावी योजनाj के िलए क(cid:11)िव*ा के वृिD लO य् म(cid:11) इन बाधाj पर (cid:29)प `ट iप से चचा(cid:23) ^कए जाने क, आवUय कता ह।ै (ii) अब तक क(cid:11)िव*ा क, ईपीएस (ii) 10-20 वषF के िलए िव0ुत क, मांग (cid:8)रपोट(cid:23) म(cid:11) अनुमािनत मांग संबंधी पूवा(cid:23)नुमान] को हमारे समाज के वा(cid:29)त िवक मांग के अनiु प ह ै और सभी (cid:29)त र] क, आवUय कता के यथाथ (cid:23) (cid:29)व ीकाय(cid:23) सीमा के अंदर ह।ै अत: मू(cid:2)य ांकन से जोड़ा जाना चािहए, ता^क 18वz ईपीएस (cid:8)रपोट(cid:23) म(cid:11) लगाए वे िव0ुत Oे- का जवाबदहे *बंधन गए मांग संबंधी पूवा(cid:23)नुमान] को सुिनिgत करन े म(cid:11) योगदान दग(cid:11) े। 12वz/13वz योजना अविध के दौरान िव0ुत आयोजना हते ु अपनाया गया ह।ै (iii) जीडीपी क, अिधकतम संक(cid:2)प ना के (iii) दशे के लगभग सभी राKय ] म(cid:11) साथ भावी मांग का पूवा(cid:23)नुमान लगाने क, िव0ुत क, मौजूदा कमी क, बजाय दशे म(cid:11) गरीबी उ2म ूलन के िलए ि(cid:29)थित म(cid:11) और जहां लाख] लोग आवUय क िव0ुत क, 2य ूनतम रािश इस िव0ुत क, आधारभतू आवUय कता उtUे य से िनधा(cid:23)(cid:8)रत क, जानी चािहए। से वंिचत ह,L ऐसी ि(cid:29)थित म(cid:11) दशे समाज ि.ड पर बड़ी Oमता अिभवृिD को लोग] क, अपेOाj को पूरा वहन नहz कर सकता ह ै और अित(cid:8)र!त करन े के िलए *यास करना मांग का दशे के आ(cid:21)थक िवकास म(cid:11) चािहए। इसके अलावा िव0ुत योगदान संभव नहz ह।ै बड़ े पैमाने पर हमारी अथ(cid:23)Wय व(cid:29)थ ा के मह(cid:12)व पूण(cid:23)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 47 8888.... सससस..ंं..ंं ((((ककककंंंंपपपपननननीीीी////ससससगगंंगगंं ठठठठनननन//// ZZZZयय यय िििि[[[[ 6666टटटट::::पप पप ििििणणणणयययय;;;; ककककाााा ससससााााररररााााशशंंशशंं हहहहममममाााारररराााा ददददििििृृृृ \\\\ककककोोोोणणणण////अअअअववववललललोोोोककककनननन ििििववववशशशशषषेेषषेे )))) सससस ेे ेे !!!!ाााा::::तत तत 6666टटटट::::पप पप ििििणणणणययययाााा ंं ंं Oमता अिभवृिD के िलए समाज पर चालक] म(cid:11) से एक ह ै और यह सामािजक, आ(cid:21)थक और पया(cid:23)वरणीय समाज के सभी वगF क, मांग को लागत बmत अिधक होगी अत: यह पूरा करने के िलए अवUय आवUय क ह ै ^क संपूण(cid:23) मांग उस सीमा उपल7ध होनी चािहए। तक रखी जाए, िजसका आसानी स े *बंधन ^कया जा सके। (iv) मौजूदा Oमताj स े (iv) य^द मौजूदा अवसंरचना का इ`ट तम अित(cid:8)र!त िबजली िमल सकती ह,ै सदपु योग ^कया जाता ह ै तो िव0ुत Oे- बशतX ^क पया(cid:23)?त मा-ा म(cid:11) Mधन को बmत अिधक Oमता अिभवृिD करन े सुिनिgत ^कया जाए। क, आवUय कता ह।ै 2021 तक आवUय क एमएनआरई ने 12वz और 13वz अित(cid:8)र!त पावर के िलए नवीकरणीय योजना म(cid:11) लगभग 30,000 ऊजा(cid:23) …ोत] से योजना बनाई जाए। मेगावाट क, अित(cid:8)र!त आरईएस Oमता के िलए योजना तैयार क, ह।ै (v) हां, कुल उ(cid:12)स ज(cid:23)न तो बढ़ (v) उ(cid:12)प ादन संबंधी आयोजना के िलए जाएगा परंतु नवीकरणीय ऊजा (cid:23) समाज के *ित प(cid:8)रयोजना क, लागत …ोत] क, िह(cid:29)स ेदारी बढ़ने दO (*(cid:12)य O और अ*(cid:12)य O दोन] लागत) को उपाय अपनाए जान े के कारण प(cid:8)रयोजना के िवकासकताj(cid:23) क, ही उ(cid:12)स ज(cid:23)न क, तीŠता कम होगी। िव(cid:12)त ीय लागत के बजाय मानदडं के iप दशे के िलए िव0ुत आयोजना दशे म(cid:11) माना जाना चािहए। 12वz और 13वz म(cid:11) उपल7ध इŽधन संसाधन पर योजना के िलए कम काब(cid:23)न उ(cid:12)स जन(cid:23) िनभ(cid:23)र करती ह ै और कोयले पर रणनीित भारी मा-ा म(cid:11) अित(cid:8)र!त हमारी िनभ(cid:23)रता िनकट भिव`य म(cid:11) जीएचजी उ(cid:12)स जन(cid:23) होने स े Wय थ(cid:23) िसD भी जारी रहगे ी। होगी, !य ]^क बड़ी सं(cid:127)य ा म (cid:11) पावर ?ल ांट (cid:29)थ ािपत ^कए जान े क, योजना बनाई गई ह।ै (vi) आगामी 25-30 वषF म(cid:11) कोयला (vi) सहमित Wय !त नहz क, जा आधा(cid:8)रत पावर ?ल ांट] को हटाने के िलए सकती प(cid:8)रभािषत योजनाए ं बनायी जाए।ं 29 चलकुडी पुजहा सरं Oण (i) क(cid:11)िव*ा क, मसौदा योजना (cid:29)थ ायी (i) य0िप आरईएस क, योजना सिमित वृिD योजना के अनiु प नहz ह।ै ^फर भी बनाई जा रही ह ै और उ(cid:12)स ाहपूव(cid:23)क य^द इसे काया(cid:23)ि2वत ^कया गया तो यह उसका काया(cid:23)2व यन ^कया जा रहा दशे के पा(cid:8)रि(cid:29)थितक,य आपदा क, तरफ ह,ै परंतु उ(cid:12)प ादन के पारंप(cid:8)रक तेजी से ल े जाएगी। योजना म(cid:11) उ(cid:2)ल ेख …ोत] के िबना बड़ी मांग को पूरा ^कया गया ह ै ^क पारंप(cid:8)रक …ोत] म(cid:11) स े नहz ^कया जा सकता ह,ै िजनस े जल िव0ुत और परमाणु िव0ुत ऊजा(cid:23) के जीएचजी उ(cid:12)स ज(cid:23)न/आर ए@ड आर (cid:29)व Gछ …ोत ह,L अत: इ2ह (cid:11) *ाथिमकता दी से संबंिधत मुt े और अ2य संबD जाए। यह अ(cid:12)य िधक Qचताजनक ह।ै सम(cid:29)य ाए ं जुड़ी ह।L पया(cid:23)वरणीय और सामािजक मुt] के आधार पर48 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 8888.... सससस..ंं..ंं ((((ककककंंंंपपपपननननीीीी////ससससगगंंगगंं ठठठठनननन//// ZZZZयय यय िििि[[[[ 6666टटटट::::पप पप ििििणणणणयययय;;;; ककककाााा ससससााााररररााााशशंंशशंं हहहहममममाााारररराााा ददददििििृृृृ \\\\ककककोोोोणणणण////अअअअववववललललोोोोककककनननन ििििववववशशशशषषेेषषेे )))) सससस ेे ेे !!!!ाााा::::तत तत 6666टटटट::::पप पप ििििणणणणययययाााा ंं ंं बड़ी जल िव0ुत प(cid:8)रयोजनाj स े िव0ुत क, उपल7ध ता अथवा िव(cid:29)थ ापन, जलमaन ता बढ़ती ह ै और अनुपल7ध ता के बीच दशे के मीथेन गैस का उ(cid:12)स जन(cid:23) होता ह।ै िवक(cid:2)प पर बड़ े पैमाने पर बहस आवUय क ह।ै (ii) डीएसएम उपाय] और बीईई (ii) मांग पूवा(cid:23)नुमान] म(cid:11) बचत के ऊजा(cid:23) काय(cid:23)कुशलता उपाय] को संभावनाj पर िवचार नहz ^कया गया nय ान म(cid:11) रखते mए बचत ह।ै अिधकांश प(cid:8)रवार] के िलए *ितमाह संभावनाj पर आयोजना तैयार 1000 यूिनट िबजली उपल7ध कराना करते समय nय ान रखा गया ह।ै अथवा महज ^दखावे को उ(cid:12)प ादन िव0ुत का द„ु पयोग अपेिOत नहz आयोजना के िलए मानदडं के iप म (cid:11) नहz ह ै परंत ु उ0ोग जगत/वािणिKयक माना जाएगा। औ0ोिगक Oे- क, (cid:29)थ ापनाj क, मांग को दशे के वत(cid:23)मान वृिD दभु ा(cid:23)aय वश भावी पीि़ढय] संपूण(cid:23) आ(cid:21)थक िवकास के िलए पूरा को उनक, मांग पूरा करने क, Oमता के ^कया जाना चािहए। साथ समझौता कर रही ह।ै (iii) जल िव0तु ?ल ांट] से संबD (iii) जैसा पहले भी उ(cid:2)ल ेख ^कया सम(cid:29)य ाj को nय ान म(cid:11) रखते mए यह सुझाव ^दया गया ह ै ^क सरकार को सभी गया ह ै ^क दशे को जल िव0ुत क, नई जल िव0तु प(cid:8)रयोजनाj पर आवUय कता ह ै और इसस े सबं ंिधत त(cid:12)क ाल एक िनलंबन आदशे जारी करना सम(cid:29)य ाj/मुt] का उपयु!त ढंग से चािहए और मौजूदा जल िव0ुत समाधान करना होगा। प(cid:8)रयोजनाj के िव(cid:29)त ृत और सहयोगा(cid:12)म क कायS(cid:12)त र िवUल ेषण पर िवचार करना चािहए। 30 अंतरा(cid:23)`< ीय न^दया ं (i) एनईपी म(cid:11) िव0ुत उ(cid:12)प ादन के िलए (i) जल िव0ुत ?ल ांट क, उGच उGच *ाथिमकता के iप म(cid:11) जल िव0तु *ाथिमकता दशे म(cid:11) अपनाई गई प(cid:8)रयोजना के िलए *(cid:29)त ाव दने े से पहल े कम काब(cid:23)न वृिD रणनीित के जल िव0ुत के घटते mए िन`प ादन और अनुसार तय क, गई ह।ै जलाशय] से जीएचजी के उ(cid:12)स ज(cid:23)न क, सम(cid:29)य ाj का िनदान ^कया जाए। (ii) िनण(cid:23)य ^कया जाए (ii) योजना म(cid:11) थम(cid:23)ल पावर ?ल ांट] क, तरह जल िव0ुत ?ल ांट] क, िड- किमशQनग क, आवUय कता का भी उ(cid:2)ल ेख ^कया जाए। (iii) दस हजार मेगावाट Oमता वाली (iii) भारत म(cid:11) पीक और ऊजा (cid:23) दोन] िहमालयन बे(cid:2)ट म(cid:11) *(cid:29)त ािवत लगभग क, कमी ह।ै अत: पी‡कग पावर सभी जल िव0ुत प(cid:8)रयोजनाए ं पीक लोड ?ल ांट] क, भी आयोजना तैयार उ(cid:12)प ादन के िलए *(cid:29)त ािवत क, जा रही ^कए जाने क, आवUय कता ह।ै ह।L पी‡कग जल िव0ुत ?ल ांट] क, पया(cid:23)वरण और सामािजक सम(cid:29)य ाए ं बmत50 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] अ(cid:2)य ाय 2222 11व(cid:7) पंचवष(cid:12)य योजना (2007-12) म(cid:17) (cid:18)मता अिभवृि(cid:23) क(cid:25) समी(cid:18)ा 2.0 (cid:1)(cid:1)(cid:1)(cid:1)(cid:2)(cid:2)(cid:2)(cid:2)तत तत ााााववववननननाााा 11व(cid:7) पंचवष(cid:12)य योजना के िलए (cid:18)मता अिभवृि(cid:23) क(cid:25) आयोजना रा!" ीय िव#ुत नीित के ल% य और उ()े य * को (cid:2)य ान म(cid:17) रखते ,ए बनाई गई। 11व(cid:7) पंचवष(cid:12)य योजना के िलए िनधा32 रत (cid:18)मता अिभवृि(cid:23) ल%य 78,700 मेगावाट था, जो 4क 10व(cid:7) पंचवष(cid:12)य योजना के दौरान हािसल 4कए गए वा8त िवक ल%य क(cid:25) तुलना म(cid:17) लगभग 3 गुना था। इतने बड़ े ल%य को <ा=त करने के िलए समय पर आदशे <8त ुत करन,े िविनमा2ण (cid:18)मता सुदढ़ृ करन,े कुशल जनशिA और िनमा2ण मशीनरी, समय पर सांिविधक 8व ीकृितयां और 4BयाCव यन एज(cid:17)िसय* के बीच बहे तर िनगरानी और समCव य आव)य क ह।ै इस अ(cid:2)य ाय म(cid:17) (cid:18)मता अिभवृि(cid:23) के िववरण और िव#तु प3रयोजनाE के समय पर 4BयाCव यन म(cid:17) आन े वाली बाधाE को दरू करने के िलए 4कए जा रह े <यास* को शािमल 4कया गया ह।ै 2222....1111 11111111वववव(cid:7)(cid:7)(cid:7)(cid:7) पपपपचचंंचचंं ववववषषषष(cid:12)(cid:12)(cid:12)(cid:12)यययय ययययोोोोजजजजननननाााा ककककाााा लललल(cid:19)(cid:19)(cid:19)(cid:19)यय यय रा!" ीय िव#ुत नीित के <मुख उ()े य * म(cid:17) से एक उ()े य यह ह ै 4क वष2 2012 तक िव#ुत क(cid:25) संपूण2 मांग को पूरा 4कया जाए और पीGकग िव#ुत तथा ऊजा2 कमी को दरू 4कया जाए। इसके अलावा 8थ ािपत (cid:18)मता क(cid:25) संपूण2 उपलIध ता को 85% तक बढ़ाया जाए और कम से कम 5% का ि8प Jनग 3रजव2 सृिजत 4कए जाने क(cid:25) आव)य कता ह।ै साथ ही वष2 2012 तक िव#ुत क(cid:25) <ित Kय िA उपलIध ता को भी 1,000 4कलोवाट घंटा से अिधक 4कया जाए। 11व(cid:7) पंचवष(cid:12)य योजना के दौरान मूत2Nप दी जाने वाली िविभCन प3रयोजनाE के काया2Cव यन क(cid:25) संभाKय ता पर िवचार करत े ,ए और इन उ()े य * को पूरा करने क(cid:25) 4दशा म(cid:17) 11व(cid:7) योजना के िलए 78,700 मेगावाट (cid:18)मता अिभवृि(cid:23) का ल%य िनधा23रत 4कया गया, िजसके िववरण तािलका 2.1 और (cid:1)(cid:1)(cid:1)(cid:1)ददददशशशश (cid:22)(cid:22) (cid:22)(cid:22)2222....1111 सससस ेे ेे 2222....2222 म (cid:17) नीच े 4दए गए ह।O ततततााााििििललललककककाााा 2222....1111 {; 11111111वववव(cid:7)(cid:7)(cid:7)(cid:7) पपपपचचंंचचंं ववववषषषष(cid:12)(cid:12)(cid:12)(cid:12)यययय ययययोोोोजजजजननननाााा ककककेेेे ििििललललएएएए (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा अअअअििििभभभभववववििृृििृृ (cid:31)(cid:31)(cid:31)(cid:31) लललल आआआआककंंककंं ड़ड़ड़ड़ ेे ेे ममममगगेेगगेे ााााववववााााटटटट मममम $$ $$ (cid:1)ोत के(cid:7)(cid:8) ीय रा(cid:12) य िनजी कुल हाइ(cid:16)ो 8888666655554444 3333444488882222 3333444499991111 11115555666622227777 थम(cid:19)ल 22224444888844440000 22223333333300001111 11111111555555552222 55559999666699993333 (cid:7)य ूि(cid:23)लयर 3333333388880000 ---- ---- 3333333388880000 जोड़ 33336666888877774444 22226666777788883333 11115555000044443333 77778888777700000000¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 51 (cid:1)(cid:1)(cid:1)(cid:1)ददददशशशश(cid:4)(cid:4)(cid:4)(cid:4) 2222....1111 Nuclear Gas/LNG Hydro 3380 6843 15627 Lignite 4% 9% 20% 2280 3% Coal 50570 Total: 78700 MW 64% <दश2 2222....2222 Private 15043 19% Central 36874 47% State 26783 34% Total: 78700 MW 11111111वववव(cid:7)(cid:7)(cid:7)(cid:7) पपपपचचंंचचंं ववववषषषष(cid:12)(cid:12)(cid:12)(cid:12)यययय ययययोोोोजजजजननननाााा मममम $$ $$(cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा अअअअििििभभभभववववििृृििृृ (cid:31)(cid:31)(cid:31)(cid:31) ककककेेेे ििििललललएएएए ततततययैैययैै ााााररररीीीी 2.2.1 (cid:2)(cid:2)(cid:2)(cid:2)वव वव ददददशशशेेशेे ीीीी ििििववववििििननननममममााााणण(cid:22)(cid:22)णण(cid:22)(cid:22) (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा :::: िव#ुत =ल ांट उप8क र* के सबसे बड़ े पूPतकता2 होने के नाते बीएचईएल को 11व(cid:7) योजना के िलए <मुख आदशे <ा=त होने क(cid:25) आशा थी। सीईए का अनुमान था 4क बीएचईएल को 50% स े अिधक उQप ादन (cid:18)मता के आदशे <ा=त ह*गे और िव#तु प3रयोजनाE के 4BयाCव यन तथा समय पर आपूPत के िलए िव#ुत (cid:18)ेR काफ(cid:25) हद तक बीएचईएल पर ही िनभ2र था। सीईए ने 11व(cid:7) पंचवष(cid:12)य योजना क(cid:25) (cid:18)मता अिभवृि(cid:23) संबंधी आव)य कताE को पूरा करने के िलए बीएचईएल क(cid:25) तैयारी क(cid:25) समी(cid:18)ा क(cid:25)। 11व(cid:7) पंचवष(cid:12)य योजना क(cid:25) शुTआत से पहले सीईए के दल* ने बीएचईएल के कायU का दौरा 4कया और िव#तु (cid:18)ेR क(cid:25) आव)य कताE तथा िव#तु (cid:18)ेR क(cid:25) बढ़ती ,ई आव)य कता को पूरा करने के िलए उनक(cid:25) िव8त ार योजनाE के बारे म(cid:17) बीएचईएल के काय2पालक* के साथ िव8त तृ चचा2ए ं कV। सीईए न े माच2, 2007 क(cid:25) अपनी 3रपोट2 म(cid:17) िविनमा2ण (cid:18)मता के सदु ढ़ृ ीकरण, कुछ आइटम* के िविनमाण2 क(cid:25) आउटसोXसग के िलए तयै ार क(cid:25) गई सचू ी म (cid:17) वड(cid:17) र* क(cid:25) सZु य ा बढ़ाने, िडजाइन और इंजीिनय[रग तथा प3रयोजना 4BयाCव यन के (cid:18)ेR म(cid:17) कुशल जनशिA तैयार करने, महQव पूण2 आइटम* जैसे फोXजग, काJ8टग, हाई <ेशर Iव ायलर साम\ी, िजनके िलए वैि]क 8त र पर ही कुछ पूPतकता 2 उपलIध ह,O के िलए अि\म खरीद कार2वाई शुN करने, प^े पर आधा3रत िनभर2 ता क(cid:25) बजाय पया2=त माRा म(cid:17) िविनमा2ण मशीनरी क(cid:25) खरीद और सूचना <ौ#ोिगक(cid:25) आधा3रत िनगरानी क(cid:25) िसफा3रश क(cid:25)। बीएचईएल क(cid:25) सुदढ़ृ ीकरण योजना पर चचा 2 करन े के िलए बीएचईएल के साथ समी(cid:18)ा बैठक* का भी आयोजन 4कया गया।52 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 2.2.2 11व(cid:7) पंचवष(cid:12)य योजना के दौरान काया2िCवत क(cid:25) जाने वाली योजनाE के िलए कोयला संपक2 8थ ािपत करने के िलए भी कार2वाई शुN क(cid:25) गई। मामले को पया2वरण एवं वन मंRालय के साथ भी उठाया गया ता4क 11व(cid:7) पंचवष(cid:12)य योजना के िलए िचि`नत प3रयोजनाE के संदभ2 म(cid:17) पया2वरण और वन 8व ीकृित <ाथिमकता के आधार पर <ा=त क(cid:25) जा सके। 2.2.3 11व(cid:7) पंचवष(cid:12)य योजना के दौरान िव#तु (cid:18)ेR क(cid:25) आव)य कताE के बारे म(cid:17) िव#ुत कंपिनयां, आईपीपी और उ#ोग जगत को संवेदनशील बनाने के िलए सीईए aारा 4 और 5 जुलाई, 2007 को 11व(cid:7) योजना और उसके प)च ात िव#ुत (cid:18)ेR के Qव 3रत िवकास के िलए महQव पूण2 इनपुट जुटाने के उ()े य से एक अंतरा2!" ीय सम ् मेलन आयोिजत 4कया गया। सीईए ने 11व(cid:7) पंचवष(cid:12)य योजना के काया2Cव यन हते ु आव)य क उQप ादन पारेषण और िवतरण के िलए िविभCन <कार के उप8क र और साम\ी क(cid:25) आव)य कता से अवगत कराया। अतं रा2!" ीय सbम ेलन क(cid:25) <मुख िसफा3रश* म(cid:17) मुZय =ल ांट और शेष =ल ांट* दोन* क(cid:25) िविनमा2ण (cid:18)मता का सुदढ़ृ ीकरण, समय पर आदशे <8त ुत करना, बोली <4Bया म(cid:17) नई कंपिनय* क(cid:25) <ितभािगता सुिनिcत करन े के िलए पूव2 अहत2 ा संबंधी आव)य कताE क(cid:25) समी(cid:18)ा, 8थ ानीय लोग* के बील कौशल िवकिसत करन े के उ()े य से प3रयोजना (cid:18)ेR के आसपास प3रयोजना िवकासकता2 aारा आईटीआई योजना को अपनाने के साथ साथ कुशल जनशिA तैयार करन े हते ु उपाय, मानक(cid:25)करण आ4द शािमल ह।O इन िसफा3रश* के संदभ2 म(cid:17) चेCन ई, चंडीगढ़ और मुbब ई म(cid:17) आयोिजत (cid:18)ेRीय काय2शालाE aारा अनुवत(cid:12) कार2वाई क(cid:25) गई। इन सbम ेलन* के दौरान उ#ोग जगत से जुड़ े लोग* को अपनी िविनमा2ण (cid:18)मता बढ़ाने के िलए आकृ!ट करन े के साथ साथ िव#तु (cid:18)ेR क(cid:25) आव)य कता को पूरा करने के िलए इन (cid:18)ेR* नए उ#िमय* को <ोQस ािहत 4कया गया। इस संदभ2 म(cid:17) सामने आने वाली बाधाE पर भी चचा2 क(cid:25) गई और इन सम8य ाE के िनदान हते ु एक रणनीित िनधा23रत क(cid:25) गई। 2.2.4 भारत सरकार न े डा. 4करीत पारेख, तQक ालीन सद8य (ऊजा2), योजना आयोग क(cid:25) अ(cid:2)य (cid:18)ता म(cid:17) बकाया =ल ांट* के िलए अित3रdत व(cid:17)डर* के िवकास हते ु भी एक सिमित ग3ठत क(cid:25)। सिमित क(cid:25) <मुख िसफा3रश(cid:17) सं(cid:18)ेप म(cid:17) नीचे दी गई ह:O (क) बीओपी (अथवा बीओपी क(cid:25) ईपीसी) के िलए आदशे मुZय =ल ांट और उप8क र* के िलए आदशे <8त ुत करने क(cid:25) तारीख स े छ: माह के भीतर <8त ुत 4कए जाने चािहए। (ख) कुछ पूPतकताE2 aारा अिधक संZय ा म(cid:17) संिवदाए ं करन े क(cid:25) घटनाE को रोकने के िलए और समय पर प3रयोजना िन!प ा4दत न करने क(cid:25) ि8थित म(cid:17) प3रसमापन (cid:18)ित को बढ़ाया जाना चािहए। (ग) केCf ीय िव#ुत <ािधकरण बीओपी व(cid:17)डर* के िलए पवू 2 अहत2 ा संबंधी आव)य कताE को फरवरी, 2008 के अतं तक अंितम Nप दगे ा। (घ) केCf ीय िव#ुत <ािधकरण और एनटीपीसी को अग8त , 2008 के अंत तक <गितशील ढंग से बीओपी के िविभCन पैकेज* के मानक(cid:25)करण/उनके िलए िव8त तृ िडजाइन मानदडं * के िलए 4दशािनदशh * को अंितम Nप दने े क(cid:25) कार2वाई पूरी करनी ह।ै (ड.) प3रयोजना के िवकासकता2E aारा कुशल जनशिA क(cid:25) उपलब् धता सुिनिcत करन े के िलए (cid:18)मता िनमाण2 4कया जाए। (च) इस बात क(cid:25) जांच क(cid:25) जाए 4क घरेलू पूPतकता2 और िवदशे ी पूPतकता2E को समान Nप से अवसर उपलIध कराया गया ह ै या नह(cid:7)। 2222....3333 11111111वववव(cid:7)(cid:7)(cid:7)(cid:7) पपपपचचंंचचंं ववववषषषष(cid:12)(cid:12)(cid:12)(cid:12)यययय ययययोोोोजजजजननननाााा ककककेेेे ििििललललएएएए लललल(cid:19)(cid:19)(cid:19)(cid:19)यय यय '''' ककककाााा मममम((((यय यय ााााववववििििधधधध मममम++ूू++ूू यय यय ााााककंंककंं नननन जैसा ऊपर उjल ेख 4कया गया ह ै 11व(cid:7) योजना के दौरान 78,700 मेगावाट (cid:18)मता अिभवृि(cid:23) का ल%य िनधा23रत 4कया गया। योजना आयोग के म(cid:2)य ाविध मूjय ांकन (एमटीए) के अनसु ार ऐसी संभावना ह ै 4क िविभCन कारण* अथा2त मुZय =ल ांट के िलए आदशे <8त ुत करने म(cid:17) िवलबं , िसिवल कायU क(cid:25) धीमी <गित, कमजोर और <ितकूल भूगभ(cid:12)य ि8थितय* आ4द के कारण 21,802 मेगावाट (cid:18)मता वाली कुछ प3रयोजनाए ं 11व(cid:7) पंचवष(cid:12)य योजना के¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 53 दौरान पूरी नह(cid:7) ह*गी। इसके अलावा कुछ अित3रdत प3रयोजनाए ं िजCह (cid:17) वा8त िवक Nप से 11व(cid:7) योजना म (cid:17) शािमल नह(cid:7) 4कया गया था, क(cid:25) भी 11व(cid:7) योजना के दौरान लाभ के िलए पहचान क(cid:25) गई है, इसके िलए प3रयोजना काया2Cव यन क(cid:25) <4Bया म(cid:17) तेजी लाने और िनमा2ण अनुसूची को संि(cid:18)=त करने का सुझाव 4दया गया ह।ै यह िवकासकता2E और अCय पणधारक* के साथ िमलकर िव#ुत मंRालय और सीईए aारा 4कए गए असाधारण <यास* के प3रणाम8व Nप ही संभव ,आ ह।ै इन अित3रdत प3रयोजनाE क(cid:25) कुल (cid:18)मता 5156 मेगावाट ह।ै उपयु2dत के आधार पर म(cid:2) याविध मूjय ांकन (एमटीए) के अनुसार 11व(cid:7) योजना के दौरान संभािवत (cid:18)मता अिभवृि(cid:23) का ल%य 62,374 मेगावाट िनधा23रत 4कया गया। िचिmनत क(cid:25) गई अित3रdत प3रयोजनाE और 11व(cid:7) पंचवष(cid:12)य योजना म(cid:17) पूरी न क(cid:25) जा सकने वाली प3रयोजनाE क(cid:25) संि(cid:18)=त जानकारी नीचे तािलका 2.2 म(cid:17) दी गई ह।ै ततततााााििििललललककककाााा 2222....2222 11111111वववव(cid:7)(cid:7)(cid:7)(cid:7) पपपपचचंंचचंं ववववषषषष(cid:12)(cid:12)(cid:12)(cid:12)यययय ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन ससससभभंंभभंं ााााििििववववतततत ललललााााभभभभ'''' ककककेेेे ििििललललएएएए अअअअिििितततत////रररर0000तत तत (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा////11111111वववव(cid:7)(cid:7)(cid:7)(cid:7) पपपपचचंंचचंं ववववषषषष(cid:12)(cid:12)(cid:12)(cid:12)यययय ययययोोोोजजजजननननाााा मममम $$ $$पपपपररूूररूू ीीीी नननन कककक1111 जजजजाााा ससससककककनननन ेे ेेववववााााललललीीीी (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा ककककाााा ससससााााररररााााशशंंशशंं आआआआककंंककंं ड़ड़ड़ड़ ेे ेेममममगगेेगगेे ााााववववााााटटटट मममम(cid:16)(cid:16)(cid:16)(cid:16) 11111111वववव(cid:2)(cid:2)(cid:2)(cid:2) ययययोोोोजजजजननननाााा ककककाााा (cid:10)(cid:10)(cid:10)(cid:10)ममममतततताााा अअअअििििभभभभववववििृृििृृ(cid:17)(cid:17)(cid:17)(cid:17) लललल(cid:19)(cid:19)(cid:19)(cid:19)यय यय ((((कककक)))) 77778888,,,,777700000000 ििििननननधधधधाााा(cid:22)(cid:22)(cid:21)(cid:21)(cid:22)(cid:22)(cid:21)(cid:21)ररररतततत लललल(cid:19)(cid:19)(cid:19)(cid:19)यय यय सससस ेे ेेपपपपीीीीछछछछेेेे ((((खखखख)))) 22221111,,,,888800002222 बबबबककककााााययययाााा (cid:10)(cid:10)(cid:10)(cid:10)ममममतततताााा ((((गगगग)))) 55556666,,,,888899998888 लललल(cid:19)(cid:19)(cid:19)(cid:19)यय यय मममम (cid:25)(cid:25) (cid:25)(cid:25)शशशशााााििििममममलललल (cid:27)(cid:27)(cid:27)(cid:27)ककककएएएए अअअअननननससुुससुु ाााारररर पपपप(cid:22)(cid:22)(cid:22)(cid:22)ररररययययोोोोजजजजननननाााा कककक!!!! (cid:10)(cid:10)(cid:10)(cid:10)ममममतततताााा मममम (cid:25)(cid:25) (cid:25)(cid:25)पपपप(cid:22)(cid:22)(cid:22)(cid:22)ररररववववततततनन(cid:21)(cid:21)नन(cid:21)(cid:21) ((((घघघघ)))) 333322220000 अअअअननननपपपपरररराााा ससससीीीी कककक!!!! (cid:10)(cid:10)(cid:10)(cid:10)ममममतततताााा मममम (cid:25)(cid:25) (cid:25)(cid:25)ववववििृृििृृ(cid:17)(cid:17)(cid:17)(cid:17) ससससजजुुजजुु ननेेननेे ससससीीीीससससीीीीजजजजीीीीटटटटीीीी कककक!!!! (cid:10)(cid:10)(cid:10)(cid:10)ममममतततताााा मममम (cid:25)(cid:25) (cid:25)(cid:25)ववववििृृििृृ(cid:17)(cid:17)(cid:17)(cid:17) ममममततेेततेे ररूूररूू ििििवववव&&&&तत तत ाााारररर कककक!!!! (cid:10)(cid:10)(cid:10)(cid:10)ममममतततताााा मममम (cid:25)(cid:25) (cid:25)(cid:25)ववववििृृििृृ(cid:17)(cid:17)(cid:17)(cid:17) लललल(cid:19)(cid:19)(cid:19)(cid:19)यय यय सससस ेे ेेपपपपररररेेेे 11111111वववव(cid:2)(cid:2)(cid:2)(cid:2) ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन ससससभभंंभभंं ााााििििववववतततत (cid:10)(cid:10)(cid:10)(cid:10)ममममतततताााा अअअअििििभभभभववववििृृििृृ(cid:17)(cid:17)(cid:17)(cid:17) 5555,,,,111155556666 ककककुुुुलललल (cid:10)(cid:10)(cid:10)(cid:10)ममममतततताााा ((((चचचच)))) ==== ((((गगगग++++घघघघ++++डडडड....)))) 66662222,,,,333377774444 मममम((((यय यय ााााववववििििधधधध मममम++ूू++ूू यय यय ााााककंंककंं नननन ((((एएएएममममटटटटीीीीएएएए)))) ककककेेेे अअअअननननससुुससुु ाााारररर 11111111वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन ससससभभंंभभंं ााााििििववववतततत (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा अअअअििििभभभभववववििृृििृृ (cid:31)(cid:31)(cid:31)(cid:31) 66662222333377774444 ममममगगेेगगेे ााााववववााााटटटट हहहह।।ैै।।ैै 66662222,,,,333377774444 ममममगगेेगगेे ााााववववााााटटटट ककककेेेे इइइइसससस (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा अअअअििििभभभभववववििृृििृृ (cid:31)(cid:31)(cid:31)(cid:31) लललल(cid:19)(cid:19)(cid:19)(cid:19)यय यय ककककाााा ससससााााररररााााशशंंशशंं ननननीीीीचचचच ेे ेेततततााााििििललललककककाााा 2222....3333 मममम $$ $$3333ददददययययाााा गगगगययययाााा हहहह।।ैै।।ैै ततततााााििििललललककककाााा 2222....3333 11111111वववव(cid:7)(cid:7)(cid:7)(cid:7) पपपपचचंंचचंं ववववषषषष(cid:12)(cid:12)(cid:12)(cid:12)यययय ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन मममम((((यय यय ााााववववििििधधधध मममम++ूू++ूू यय यय ााााककंंककंं नननन लललल(cid:19)(cid:19)(cid:19)(cid:19)यय यय ककककाााा ससससििंंििंं (cid:26)(cid:26)(cid:26)(cid:26)7777तत तत ििििववववववववररररणणणण ((((रररराााा8888यय यय ववववाााारररर औऔऔऔरररर (cid:1)(cid:1)(cid:1)(cid:1)ककककााााररररववववाााारररर)))) ((((आआआआककंंककंं ड़ड़ड़ड़ ेे ेे ममममगगेेगगेे ााााववववााााटटटट मममम))$$))$$ हहहहााााइइइइ(cid:4)(cid:4)(cid:4)(cid:4)ोोोो ककककुुुुलललल थथथथममममलल(cid:12)(cid:12)लल(cid:12)(cid:12) थथथथममममलल(cid:12)(cid:12)लल(cid:12)(cid:12) ििििववववववववररररणणणण ****यय यय ििूूििूू++++ललललययययरररर जजजजोोोोड़ड़ड़ड़ ककककेेेे(cid:18)(cid:18)(cid:18)(cid:18)(cid:19)(cid:19) (cid:19)(cid:19) ीीीीयययय (cid:22)(cid:22)(cid:22)(cid:22)(cid:23)(cid:23)ेे(cid:23)(cid:23)ेे 2222999922222222 11114444999922220000 13430 750 740 0 3333333388880000 22221111222222222222 रररराााा(cid:24)(cid:24)(cid:24)(cid:24)यय यय (cid:22)(cid:22)(cid:22)(cid:22)(cid:23)(cid:23)ेे(cid:23)(cid:23)ेे 2222888855554444 11118888555500001111 14735 450 3316 0 0000 22221111333355555555 (cid:25)(cid:25)(cid:25)(cid:25)ााााइइइइववववटटेेटटेे (cid:22)(cid:22)(cid:22)(cid:22)(cid:23)(cid:23)ेे(cid:23)(cid:23)ेे 2222444466661111 11117777333333336666 13725 1080 2531 0 0000 11119999777799997777 अअअअििििखखखखलललल----भभभभााााररररततततीीीीयययय 8888222233337777 55550000777755556666....9999 41890 2280 6587 0 3333333388880000 66662222333377774444 2222....4444 11111111वववव(cid:7)(cid:7)(cid:7)(cid:7) पपपपचचंंचचंं ववववषषषष(cid:12)(cid:12)(cid:12)(cid:12)यययय ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन ववववाााा(cid:2)(cid:2)(cid:2)(cid:2)तत तत ििििववववकककक (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा अअअअििििभभभभववववििृृििृृ (cid:31)(cid:31)(cid:31)(cid:31) 11व(cid:7) पंचवष(cid:12)य योजना के दौरान 54,964 मेगावाट (cid:18)मता 8थ ािपत क(cid:25) गई ह।ै 11व(cid:7) पंचवष(cid:12)य योजना के दौरान 8थ ािपत (cid:18)मता के वष2वार/nधनवार और (cid:18)ेRवार िववरण तािलका 2.4 और 2.5 म(cid:17) नीचे 4दए गए ह:O54 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ततततााााििििललललककककाााा 2222....4444 आंकड़ ेमेगावाट म(cid:30) ( ) (cid:1)(cid:1)(cid:1)(cid:1)ककककाााारररर 2222000000007777----00008888 2222000000008888----00009999 2222000000009999----11110000 2222000011110000----11111111 2222000011111111----11112222 ककककुुुुलललल हहहहााााइइइइ(cid:20)(cid:20)(cid:20)(cid:20)ोोोो 2222,,,,444422223333 999966669999 33339999 666699990000 1111,,,,444422223333 5555,,,,555544444444 थथथथममममलल(cid:4)(cid:4)लल(cid:4)(cid:4) 6666,,,,666622220000 2222,,,,444488885555 9999,,,,111100006666 11111111,,,,222255551111 11119999,,,,000077779999 44448888,,,,555544440000 (cid:24)(cid:24)(cid:24)(cid:24)यय यय ििूूििूू (cid:28)(cid:28)(cid:28)(cid:28)ललललययययरररर 222222220000 0000 444444440000 222222220000 2222,,,,000000000000 888888880000 जजजजोोोोड़ड़ड़ड़ 9999,,,,222266663333 3333,,,,444455554444 9999,,,,555588885555 11112222,,,,111166661111 22220000,,,,555500002222 55554444,,,,999966664444 तािलका 2222....5555 11111111वववव(cid:2)(cid:2)(cid:2)(cid:2) पपपपचचंंचचंं ववववषषषष(cid:8)(cid:8)(cid:8)(cid:8)यययय ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन ववववाााा(cid:19)(cid:19)(cid:19)(cid:19)तत तत ििििववववकककक (cid:22)(cid:22)(cid:22)(cid:22)ममममतततताााा अअअअििििभभभभववववििृृििृृ (cid:27)(cid:27)(cid:27)(cid:27) ककककाााा (cid:28)(cid:28)(cid:28)(cid:28)ककककााााररररववववाााारररर औऔऔऔरररर (cid:22)(cid:22)(cid:22)(cid:22)(cid:30)(cid:30)ेे(cid:30)(cid:30)ेे ववववाााारररर ससससााााररररााााशशंंशशंं (cid:1)(cid:1)(cid:1)(cid:1)(cid:3)(cid:3)ेे(cid:3)(cid:3)ेे हहहहााााइइइइ(cid:4)(cid:4)(cid:4)(cid:4)ोोोो थथथथममममलल(cid:12)(cid:12)लल(cid:12)(cid:12) ((((ममममेगेगेगेगााााववववााााटटटट)))) (cid:18)(cid:18)(cid:18)(cid:18)यय यय ििूूििूू(cid:28)(cid:28)(cid:28)(cid:28)ललललययययरररर ककककुुुुलललल (cid:22)(cid:22)(cid:22)(cid:22)ममममतततताााा ((((ममममेगेगेगेगााााववववााााटटटट)))) ((((ममममेगेगेगेगााााववववााााटटटट)))) ((((ममममेगेगेगेगााााववववााााटटटट)))) ककककोोोोययययललललाााा गगगगैसैसैसैस ििििलललल(cid:30)(cid:30)(cid:30)(cid:30)नन नन ााााइइइइटटटट जजजजोोोोड़ड़ड़ड़ के(cid:3)(cid:5) ीय (cid:8)े(cid:9)(cid:1) (cid:2)(cid:3)(cid:3)(cid:4)(cid:1) (cid:2)(cid:2)(cid:3)(cid:3)(cid:4)(cid:1) (cid:5)(cid:6)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:2)(cid:7)(cid:5)(cid:8)(cid:4)(cid:1) (cid:9)(cid:9)(cid:4)(cid:1) (cid:2)(cid:3)(cid:7)(cid:7)(cid:4)(cid:1) रा(cid:12)य (cid:8)े(cid:9) (cid:1) (cid:7)(cid:5)(cid:4)(cid:7)(cid:1) (cid:2)(cid:2)(cid:10)(cid:8)(cid:3)(cid:1) (cid:2)(cid:9)(cid:9)(cid:3)(cid:1) (cid:6)(cid:3)(cid:4)(cid:1) (cid:2)(cid:6)(cid:4)(cid:11)(cid:4)(cid:1) (cid:4)(cid:1) (cid:2)(cid:10)(cid:5)(cid:11)(cid:7)(cid:1) िनजी (cid:8)े(cid:9) (cid:1) (cid:2)(cid:7)(cid:8)(cid:7)(cid:1) (cid:2)(cid:9)(cid:10)(cid:6)(cid:8)(cid:1) (cid:7)(cid:3)(cid:11)(cid:4)(cid:1) (cid:3)(cid:6)(cid:4)(cid:1) (cid:7)(cid:2)(cid:5)(cid:7)(cid:4)(cid:1) (cid:4)(cid:1) (cid:7)(cid:11)(cid:4)(cid:2)(cid:7)(cid:1) अिखल भारतीय (cid:21)त (cid:12)(cid:1) 5555555544444444 44441111888899994444 5555111155556666 1111444499990000 44448888555544440000 888888880000 55554444999966664444 11व(cid:7) पंचवष(cid:12)य योजना के िलए (cid:18)मता अिभवृि(cid:23) ल%य /उपलिIध के राoय वार/(cid:18)ेRवार िववरण का साराशं अअअअननननबबुुबबुु धधंंधधंं 2222....1111 म(cid:17) 4दया गया ह।ै 2222....4444....1111 ववववषषषषवव(cid:22)(cid:22)वव(cid:22)(cid:22) ाााारररर लललल(cid:19)(cid:19)(cid:19)(cid:19)यय यय औऔऔऔरररर ववववाााा(cid:2)(cid:2)(cid:2)(cid:2)तत तत ििििववववकककक (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा अअअअििििभभभभववववििृृििृृ (cid:31)(cid:31)(cid:31)(cid:31) ((((2222000000007777----11112222)))) 11व(cid:7) योजना (2007-12) के दौरान संशोिधत कायB2 म/ल%य तथा वा8त िवक उपलिIधय* का सारांश नीचे 4दया गया ह।ै ततततााााििििललललककककाााा 2222....6666 11111111वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा अअअअििििभभभभववववििृृििृृ (cid:31)(cid:31)(cid:31)(cid:31) ककककाााा लललल(cid:19)(cid:19)(cid:19)(cid:19)यय यय //// उउउउपपपपललललिििि;;;;धध धध (आआआआककंंककंं ड़ड़ड़ड़ ेे ेे ममममगगेेगगेे ााााववववााााटटटट मममम)$$$$ हहहहााााइइइइ<<<<ोोोो थथथथममममलल(cid:22)(cid:22)लल(cid:22)(cid:22) >>>>यय य य ििूूििूू 0000ललललययययरररर जजजजोोोोड़ड़ड़ड़ ल%य वा8त िवक ल%य वा8त िवक ल%य वा8त िवक ल%य ववववाााा(cid:2)(cid:2)(cid:2)(cid:2)तत तत ििििववववकककक 2222000000007777----00008888 2372 2423 8907 6620 660 220 12039 9999222266663333 2222000000008888----00009999 1097 969 5773 2485 660 0 7530 3333444455554444**** 2222000000009999----11110000 845 39 13002 9106 660 440 14507 9999555588885555 2222000011110000----11111111 1,346 690 11117777,,,,777799993333 11111111,,,,222255551111 1111,,,,222222220000 222222220000 22220000,,,,333355559999 11112222111166661111 2222000011111111----11112222 1,990 1423 11113333,,,,666611111111 11119999,,,,000077779999 2222,,,,000000000000 0000 11117777666600001111 22220000555500002222 *सीईए/एमओपी aारा 8थ ापना क(cid:25) प3रभाषा म(cid:17) प3रवत2न के कारण कम उपलिIध¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 55 11व(cid:7) योजना के दौरान 8थ ािपत वा8त िवक (cid:18)मता क(cid:25) तुलना म(cid:17) िनधा23रत तारीख से पीछे/(cid:18)मता अिभवृि(cid:23) का सारांश तािलका 2.7 म(cid:17) 4दया गया ह।ै तािलका 2222....7777 (आंकड़ े मेगावाट म(cid:17)) (cid:10)(cid:10)(cid:10)(cid:10)ममममतततताााा अअअअििििभभभभववववििृृििृृ(cid:17)(cid:17)(cid:17)(cid:17) लललल(cid:19)(cid:19)(cid:19)(cid:19)यय यय ((((कककक)))) 77778888,,,,777700000000 लललल(cid:19)(cid:19)(cid:19)(cid:19)यय यय सससस ेे ेेपपपपीीीीछछछछेेेे (खखखख) 33,415 शशशशेषेषेषेष (cid:10)(cid:10)(cid:10)(cid:10)ममममतततताााा (गगगग) = (कककक-खखखख) 45,285 (cid:10)(cid:10)(cid:10)(cid:10)ममममतततताााा ककककेेेे लललल(cid:19)(cid:19)(cid:19)(cid:19)यय यय मममम (cid:25)(cid:25) (cid:25)(cid:25)पपपप(cid:22)(cid:22)(cid:22)(cid:22)ररररववववततततनन(cid:21)(cid:21)नन(cid:21)(cid:21) (घघघघ) 405 अअअअननननपपपपरररराााा ‘गगगग’ कककक!!!! (cid:10)(cid:10)(cid:10)(cid:10)ममममतततताााा ककककोोोो 1111000000000000 ममममगगेेगगेे ााााववववााााटटटट सससस ेे ेे1111222200000000 ममममगगेेगगेे ााााववववााााटटटट ततततकककक बबबबढ़ढ़ढ़ढ़ााााननननाााा - 200 ससससजजुुजजुु नननन ससससीीीीससससीीीीजजजजीीीीटटटटीीीी कककक!!!! (cid:10)(cid:10)(cid:10)(cid:10)ममममतततताााा ककककोोोो 1128 ममममगगेेगगेे ााााववववााााटटटट सससस ेेेे1148 ममममगगेेगगेे ााााववववााााटटटट ततततकककक बबबबढ़ढ़ढ़ढ़ााााननननाााा - 20 उउउउडडडडुुुु////पप पप ीीीी टटटटीीीीपपपपीीीीपपपपीीीी कककक!!!! (cid:10)(cid:10)(cid:10)(cid:10)ममममतततताााा ककककोोोो 1015 ममममगगेेगगेे ााााववववााााटटटट सससस ेेेे1200 ममममेगेगेगेगााााववववााााटटटट ततततकककक बबबबढ़ढ़ढ़ढ़ााााननननाााा - 185 ममममललूूललूू लललल(cid:19)(cid:19)(cid:19)(cid:19)यय यय सससस ेे ेेककककुुुुलललल (cid:10)(cid:10)(cid:10)(cid:10)ममममतततताााा (गगगग+घघघघ) 45,690 11111111वववव(cid:2)(cid:2)(cid:2)(cid:2) ययययोोोोजजजजननननाााा ककककाााायययय(cid:21)0(cid:21)0(cid:21)0(cid:21)0मममम सससस ेे ेेइइइइततततरररर &&&&थथ थथ ााााििििपपपपतततत अअअअिििितततत(cid:22)(cid:22)(cid:22)(cid:22)रररर++++तत तत (cid:10)(cid:10)(cid:10)(cid:10)ममममतततताााा 9,274 ककककुुुुलललल (cid:10)(cid:10)(cid:10)(cid:10)ममममतततताााा (चचचच) = (गगगग+घघघघ+डडडड....) 54,964 मूल ल%य 78,700 मेगावाट, म(cid:2)य ाविध मूjय ांकन ल%य 62,374 मेगावाट और वा8त िवक (cid:18)मता अिभवृि(cid:23) 54,964 के अनुसार 11व(cid:7) योजना क(cid:25) प3रयोजनाE क(cid:25) तुलनाQम क सूची अनुबंध-2.2 म(cid:17) दी गई ह:ै 2222....4444....2222 11111111वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन पपपप////ररररययययोोोोजजजजननननाााा???? कककक1111 (cid:2)(cid:2)(cid:2)(cid:2)थथ थथ ाााापपपपननननाााा मममम $$ $$ििििववववललललबबंंबबंं ककककेेेे ककककााााररररणणणण • आदशे <8त ुत करने म(cid:17) िवलंब – मुZय Nप से िसिवल कायU और बकाया =ल ांट* (बीओपी) के िलए। • मुZय =ल ांट और बीओपी के िलए साम\ी क(cid:25) आपूPत म(cid:17) िवलंब और आपूPत Bमब(cid:23) न होना। • उिpमा2ण और 8थ ापना के िलए कुशल जनशिA क(cid:25) कमी। • प3रयोजना िवकासकता 2 और संिवदाकार तथा उनके उप व(cid:17)डर / उप संिवदाकार* के बीच संिवदागत िववाद। • िनमा2ण मशीनरी का अपया2=त िनयोजन। • nधन (गैस और Cय ूिdलयर ) क(cid:25) कमी। • भूिम अिध\हण। • िव)व सनीय िनमा2ण िव#ुत आपूPत और भारी उप8क र* क(cid:25) प3रवहन संबंधी बाधाE जैसी अपया2=त अवसंरचना सुिवधाए।ं 2222....5555 ककककैैैैिििि7777टटटटवववव पपपपााााववववरररर 7777लल लल ााााटटंंटटंं '''' सससस ेे ेे(cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा अअअअििििभभभभववववििृृििृृ (cid:31)(cid:31)(cid:31)(cid:31) दशे म(cid:17) िविभCन <कार के अलग अलग आकार वाले सह उQप ादन पावर =ल ांट* सिहत बड़ी संZय ा म(cid:17) कैि=टव =ल ांट उपलIध ह,O िजनका सदपु योग संसाधन, उ#ोग और आंत3रक िव#ुत खपत के िलए 4कया जाता ह।ै ब,त स े उ#ोग* ने िव)व सनीय और गुणवQत ा युdत िव#तु आपूPत सुिनिcत करने के िलए अपने कैि=टव पावर =ल ांट56 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 8थ ािपत 4कए ह।O कुछ =ल ांट* क(cid:25) 8थ ापना वै किjपक यूिनट* के Nप म(cid:17) भी गई ह ै और उनका <चालन केवल आकि8मक ि8थितय* के दौरान ही 4कया जाता ह ै जब ि\ड उपलIध नह(cid:7) होती ह।ै कैि=टव पावर =ल ांट* से अिधशेष पावर, य4द कोई ह,ै को िव#तु अिधिनयम, 2003 के अनसु ार ि\ड को उपलIध कराया जा सकता ह,ै dय *4क इसके िलए भेदभाव रिहत मुdत अिभगम का <ावधान 4कया गया ह।ै कैि=टव पावर =ल ांट िविनमा2ताE, उ#ोग* और अCय qोत* स े <ा=त सूचना के आधार पर कैि=टव पावर =ल ांट* स े संभािवत (cid:18)मता अिभवृि(cid:23) लगभग 14176 मेगावाट ह।ै इसके वष2वार िववरण नीचे (cid:1)(cid:1)(cid:1)(cid:1)ददददशशशश (cid:22)(cid:22) (cid:22)(cid:22) 2222....3333 म(cid:17) 4दए गए ह O : <दश2 2222....3333 31 माच 2 2012 क(cid:25) ि8थित के अनुसार कैि=टव पावर =ल ांट* (1 मेगावाट और उससे अिधक (cid:18)मता वाले) क(cid:25) 8थ ािपत (cid:18)मता लगभग 36500 मेगावाट ह।ै 31 माच2, 2011 क(cid:25) ि8थित के अनुसार कैि=टव पावर =ल ांट* क(cid:25) 8थ ािपत (cid:18)मता म(cid:17) 10.9% क(cid:25) वृि(cid:23) दज 2 क(cid:25) गई और यह बढ़कर 32900 मेगावाट हो गई ह।ै वष2 2010-11 के दौरान कैि=टव पावर =ल ांट* (1 मेगावाट और उससे अिधक (cid:18)मता वाले) से ऊजा2 उQप ादन लगभग 114 िबिलयन यूिनट था और इसम(cid:17) वष2 2009-10 के दौरान 106 िबिलयन यूिनट क(cid:25) तुलना म(cid:17) लगभग 7.5% क(cid:25) वृि(cid:23) दज2 क(cid:25) गई ह।ै कैि=टव पावर =ल ांट* से वष2 2010-11 के दौरान 14.2 िबिलयन अिधशेष पावर रा!" ीय ि\ड म(cid:17) फ(cid:25)ड क(cid:25) गई। 2222....6666 11111111वववव(cid:7)(cid:7)(cid:7)(cid:7) पपपपचचंंचचंं ववववषषषष(cid:12)(cid:12)(cid:12)(cid:12)यययय ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन ििििAAAAडडडड सससस ेे ेेअअअअततंंततंं ::::ससससबबंंबबंं (cid:31)(cid:31)(cid:31)(cid:31) ननननववववीीीीककककररररणणणणीीीीयययय ऊऊऊऊजजजजाााा (cid:22)(cid:22) (cid:22)(cid:22)DDDDोोोोतततत 11व(cid:7) पंचवष(cid:12)य योजना नवीकरणीय िव#ुत qोत* से 14,000 मेगावाट क(cid:25) (cid:18)मता अिभवृि(cid:23) क(cid:25) प3रकjप ना क(cid:25) गई ह।ै qोतवार िववरण नीचे तािलका 2.8 म(cid:17) 4दए गए ह O :¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 57 ततततााााििििललललककककाााा 2222....8888 11व(cid:7) पंचवष(cid:12)य योजना के दौरान ि\ड से अतं :संब(cid:23) नवीकरणीय ऊजा2 qोत ((((आआआआककंंककंं ड़ड़ड़ड़ ेे ेे ममममगगेेगगेे ााााववववााााटटटट मममम))$$))$$ 11111111वववव!!!! ययययोोोोजजजजननननाााा ककककेेेे ििििललललएएएए लललल""""यय यय (cid:29)(cid:29)(cid:29)(cid:29)ोोोोतततत (cid:1)(cid:1)(cid:1)(cid:1)णणणणााााललललीीीी //// (cid:31)वड पावर 10,500 बायोमास पावर बायोमास & गैसीफायर 2,100 लघु हाइrो (25 मेगावाट तक) 1400 जजजजोोोोड़ड़ड़ड़ 11114444,,,,000000000000 (cid:1)ोत एमएनआरई (cid:1)(cid:1)(cid:1)(cid:1)ददददशशशश (cid:22)(cid:22) (cid:22)(cid:22) 2222....4444 Biomass Power Small Hydro & Biomass (up to 25 MW) Gasifiers 1400 Wind Power 2,100 10% 10,500 75% 15% 10व(cid:7) पंचवष(cid:12)य योजना के अंत म(cid:17) नवीकरणीय िव#ुत qोत* क(cid:25) 8थ ािपत (cid:18)मता 7760 मेगावाट थी िजसम (cid:17) जब4क 11व(cid:7) योजना के अंत म(cid:17) 8थ ािपत (cid:18)मता 24914 मेगावाट ह।ै 11व(cid:7) पंचवष(cid:12)य योजना के दौरान नवीकरणीय िव#ुत qोत* स े 14000 मेगावाट (cid:18)मता का ल%य िनधा23रत 4कया था। 11व(cid:7) पंचवष(cid:12)य योजना के दौरान ि\ड से अंत:संब(cid:23) नवीकरणीय ऊजा2 qोत* के िलए 14000 मेगावाट के उपयु2dत ल%य म(cid:17) िवत3रत नवीकरणीय िव#तु <णाली (डीआरपीएस) से 1,000 मगे ावाट क(cid:25) <8त ािवत (cid:18)मता अिभवृि(cid:23) शािमल नह(cid:7) ह।ै इस <कार 11व(cid:7) पंचवष(cid:12)य योजना के दौरान नवीकरणीय िव#ुत qोत* से 17,154 मेगावाट (cid:18)मता अिभवृि(cid:23) क(cid:25) गई। 2222....7777 अअअअगगगग(cid:2)(cid:2)(cid:2)(cid:2)तत तत ,,,, 2222000000008888 मममम $$ $$ससससीीीीईईईईएएएए////एएएएममममओओओओपपपपीीीी GGGGाााारररराााा (cid:2)(cid:2)(cid:2)(cid:2)थथ थथ ाााापपपपननननाााा कककक1111 पपपप////ररररभभभभााााषषषषाााा मममम $$ $$पपपप////ररररववववततततनन(cid:22)(cid:22)नन(cid:22)(cid:22) 8थ ापना/(cid:18)मता अिभवृि(cid:23) केवल तभी मानी जाएगी जब Cय ूिdलयर =ल ांट और जलाशय आधा3रत जल िव#ुत 8ट ेशन* को छोड़कर नेम =ल ेट रे[टग पर 4कसी यूिनट aारा िव#ुत उQप ादन (cid:18)मता का <दश2न करने के प)च ात ही मानी जाएगी। (cid:18)मता अिभविृ (cid:23) क(cid:25) तारीख ऐसी तारीख होगी जब िनbन िलिखत शतs पूरी कर ली जाएगं ी: AAAA.... थथथथममममलल(cid:22)(cid:22)लल(cid:22)(cid:22) ((((ककककोोोोययययललललाााा,,,, गगगगससैैससैै ,,,, ििििललललHHHHनन नन ााााइइइइटटटट)))) i. यूिनट के सरु ि(cid:18)त <चालन हते ु आव)य क सभी =ल ांट और उप8क र* का िनमा2ण और 8थ ापना पूरी हो जाती ह।ै58 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ii. <चालन हते ु <ायोिगक परी(cid:18)ण शुN कर 4दया जाता ह।ै iii. यूिनट ने िनधा23रत nधन से पूण2त: रे3टत भार का ल%य <ा=त कर िलया ह।ै iv वािणिoयक <चालन क(cid:25) तारीख। BBBB.... हहहहााााइइइइ<<<<ोोोो i. <चालन हते ु <ायोिगक परी(cid:18)ण शुN कर 4दया ह।ै ii. यूिनट न े पूरी तरह से रन ऑफ 3रवर 8ट ेशन* और तालाब युdत रन ऑफ 3रवर 8ट ेशन* के मामले म(cid:17) पूण2त: रे3टत (cid:18)मता <ा=त कर ली हो। iii. यूिनट न े 8ट ोरेज पावर 8ट ेशन* के मामले म(cid:17) मौजूदा जलाशय 8त र के अनुNप िडजाइन क(cid:25) गई (cid:18)मता अथवा पूण2त: रे3टत (cid:18)मता का ल%य <ा=त कर िलया हो। iv वािणिoयक <चालन क(cid:25) तारीख गगगग .... >>>>यय य य ििूूििूू 0000ललललययययरररर Cय ूिdलयर यूिनट* को 8थ ािपत केवल तभी घोिषत 4कया जाएगा जब =ल ांट <ािधकारी aारा उसे ''वािणिoयक Nप से <चालनरत’’ घोिषत कर 4दया जाता ह।ै इससे पहले यूिनट को केवल ि\ड के साथ JसBोनाइजेशन के िलए ही 8थ ािपत माना जाता ह।ै 2222....8888 :::: ििििववववIIIIततुुततुु (cid:26)(cid:26)(cid:26)(cid:26)KKेेKKेे ककककेेेे ििििववववककककाााासससस मममम $$ $$ (cid:1)(cid:1)(cid:1)(cid:1)ममममखखुुखखुु बबबबााााधधधधााााएएएए ंं ंं औऔऔऔरररर इइइइनननन चचचचननननुुुु ौौौौििििततततयययय'''' ककककाााा ससससााााममममननननाााा ककककररररनननन ेे ेे ककककेेेे ििििललललएएएए ससससररररककककाााारररर GGGGाााारररराााा शशशशMMुुMMुु कककक1111 गगगगईईईई ररररणणणणननननीीीीिििितततत • मुZय =ल ांट क(cid:25) िविनमा2ण (cid:18)मता बढ़ाना बीएचईएल ने अपनी िविनमा2ण (cid:18)मता को 6,000 मेगावाट <ितवष2 से बढ़ाकर 15,000 मेगावाट <ित वष2 करन े के िलए अपनी अवसंरचना का सुदढ़ृ ीकरण 4कया ह ै और इस े 20000 मेगावाट <ित वष2 तक बढ़ान े के िलए आव)य क इंतजाम कर रहा ह।ै सीईए aारा सुपर 4B3टकल Iव ॉयलर टबा2इन जनरेटर के िलए पूव2 अहत2 ा आव)य कताE क(cid:25) समी(cid:18)ा क(cid:25) गई ह ै और आपूPत बढ़ाने तथा <ित8प धा2 को <ोQस ािहत करने के िलए िविनमा2ण (cid:18)ेR म(cid:17) नई कंपिनय* के पदाप2ण को बढ़ावा दने े के उ()े य से िव#ुत कंपिनय* को संशोिधत सलाह जारी क(cid:25) गई। इस 4दशा म(cid:17) एक बड़ा <यास यह रहा 4क 8ट ीम जनरेटर और टबा2इन जनरेटर के िलए िविनमा2ण सुिवधाE क(cid:25) 8थ ापना हते ु ब,त से नए िविनमा2ताE न े Tिच 4दखाई ह ै और वे आगे आए ह।O इनम(cid:17) िनbन िलिखत शािमल ह O : 1. एल एvड टी-एमएचआई 2. तोशीबा-जेएसडIj य ू 3. अjस टम-भारत फोज 2 4. अंसाjड ो कैjड ी-गेमन 5. बीजीआर-िहताची 6. डोव 7. थमhdस -बैबकॉक 8. सेथर वेसjस बबबबीीीीएएएएचचचचईईईईएएएएलललल औऔऔऔरररर ििििववववििििभभभभ>>>>नन नन ससससयययंंयंं 00ुु00ुु तत तत उउउउIIIIमममम'''' कककक1111 उउउउNNNNपप पप ााााददददनननन अअअअननननससुुससुु ििूूििूू चचचचयययय'''' ककककेेेे आआआआधधधधाााारररर पपपपरररर ऐऐऐऐससससाााा ममममहहहहससससससूूससूू 3333ककककययययाााा जजजजाााातततताााा हहहह ैै ैै 3333कककक जजजजहहहहाााा ंं ंंततततकककक ममममPPुुPPुु यय यय 7777लल लल ााााटटंंटटंं उउउउपपपप(cid:2)(cid:2)(cid:2)(cid:2)कक कक रररर'''' ककककाााा ससससबबंंबबंं धधंंधधंं हहहह,,ैै,,ैै ततततोोोो ददददशशशशेेेे मममम $$ $$पपपपययययाााा77(cid:22)(cid:22)77(cid:22)(cid:22) तत तत ििििववववििििननननममममााााणण(cid:22)(cid:22)णण(cid:22)(cid:22) (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा उउउउपपपपलललल;;;;धध धध हहहहोोोोगगगगीीीी।।।।¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 59 ससससययंंययंं ु+ु+ु+ु+तत तत उउउउ3333मममम 4444वव व व ॉॉॉॉययययललललरररर टटटटबबबबााााइइ(cid:21)(cid:21)इइ(cid:21)(cid:21) नननन –––– अअअअ6666यय यय ििुुििुु7777ययययाााा ंं ंं जजजजननननररररेेेेटटटटरररर एल ए%ड टी 4000 मेगावाट 4000 • (cid:1)व ॉयलर और टबा(cid:12)इन का उ(cid:17)प ादन (cid:20)ारंभ एमएचआई मेगावाट - 5000 • टबा(cid:12)इन के िविनमा(cid:12)ण हते ु सभी िविनमा(cid:12)ण सिु वधाएं जून, 2013 अjस टम-भारत फोज2 तक पूरी क! जाएं मेगावाट - 3000 • सभी िविनमाण(cid:12) सुिवधाएं अ(cid:20)ैल, 2013 तक पूरी क! जाएं तोशीबा-जेएसडIj य ू मेगावाट 4000 मेगावाट - • सुिवधा’ को पूरा करने क! संभािवत तारीख *दसंबर, 2012 गेमन-अंसाjड ो (2000 मेगावाट) और *दसंबर, 2014 (अित+र,त 2000 मेगावाट) थम&(cid:23)स -बैबकॉक और 3000 मेगावाट • सभी िविनमाण(cid:12) सुिवधाएं माच,(cid:12) 2013 तक पूरी क! जाएं िवलकॉ(cid:23)स बीजीआर-िहताची 5 (cid:1) वॉलयर (cid:20)ित • सभी िविनमाण(cid:12) सुिवधाएं जनवरी, 2013 तक पूरी क! जाएं )व ॉयलस(cid:19) *ाइवेट वष(cid:12) (~3000 िलिमटेड मेगावाट बीजीआर िहताची 5 टबा(cid:12)इन • सभी िविनमाण(cid:12) सुिवधाएं जुलाई, 2014 तक पूरी क! जाएं टबा(cid:12)इन जनरेटर (cid:20)ाइवेट जनरेटन (cid:20)ित िलिमटेड वष(cid:12) (~3000 मेगावाट दसू न चे0 नई व, स (cid:12) 2200 मेगावाट • डीसीड(cid:1)4 य ू (cid:20)ाइवेट िलिमटेड दसू न, को+रया िलिमटेड क! 100% (cid:20)ाइवेट िलिमटेड 5व ािम(cid:17)व वाली एक सहायक कंपनी ह ैिजसक! 5थ ापना भारत म7 *(सब *2+टकल 20.7.2007 को क! गई। और सुपर • मौजूदा सुिवधा – चे0न ई : अिध:हीत क! गई अित+र,त सुिवधा *2+टकल दोन3) कांचीपुरम िजले का म0न रू गांव • अित+र,त सुिवधा’ से उ(cid:17)प ादन िसतंबर, 2012 तक शु< *कया जाए • बबबबीीीीओओओओपपपपीीीी ववववडड$$डड$$ रररर'''' कककक1111 ििििववववििििननननममममााााणण(cid:22)(cid:22)णण(cid:22)(cid:22) (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा बबबबढ़ढ़ढ़ढ़ााााननननाााा दशे म(cid:17) बीओपी व(cid:17)डर सीिमत संZय ा म(cid:17) थे। िपछले कुछ वषU म(cid:17) ऐसा दखे ा गया है 4क कुछ =ल ांट* क(cid:25) 8थ ापना L;k बीओपी म(cid:17) िवलंब के कारण नह(cid:7) क(cid:25) जा सक(cid:25), जब4क उनके मुZय पलांट* का काय2 पूरा कर िलया था। इस सम से िनजात पाने के िलए बीओपी जैसे कोल हडO Jलग =ल ांट, ऐश हडO Jलग =ल ांट, जल उपचार =ल ांट आ4द के िलए व(cid:17)डर आधार का िव8त ार करने क(cid:25) आव)य कता के <ित उ#ोग जगत को संवेदनशील बनाने हते ु कार2वाई शुN क(cid:25) गई ह।ै उ#ोग जगत को अपनी िविनमा2ण (cid:18)मताE को बढ़ाने के साथ साथ इन (cid:18)ेR* म(cid:17) नए उ#िमय* को <ोQस ािहत 4कया गया ह।ै बीओपी के नए व(cid:17)डर* के िलए अहत2 ा संबंधी आव)य कताE म(cid:17) छूट <दान क(cid:25) गई है िजससे 4क बोली <4Bया के िलए नए व(cid:17)डर भी अहक2 हो सक(cid:17)। बीओपी <णािलय* के मानक(cid:25)करण और बीओपी संबंधी आदशे * का एक गितशील डटे ाबेस बनाए रखने के िलए 4कसी केCf ीय संगठन को अिधदिे शत करन े पर िवचार 4कया जा रहा ह।ै एनटीपीसी न े िव#ुत (cid:18)ेR के िलए आव)य क काJ8टग, फोXजग, 4फ[टग और हाई <ेसर पाइJपग के िविनमा2ण हते ु एक संयुdत उ#म कंपनी को बढ़ावा दने े के िलए भारत फोज2 िलिमटेड के साथ एक समझौता wापन (एमओयू) पर ह8त ा(cid:18)र 4कए ह।O एनपीसी और एल एvड टी ने भी फोXजग के िविनमा2ण हते ु एक संयुdत उ#म 8थ ािपत करने का <8त ाव 4दया ह,ै जो Cय ूिdलयर =ल ांट आव)य कताE के अलावा थम2ल पावर प3रयोजनाE क(cid:25) भी आव)य कताE को पूरा करेगा।60 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] • ििििननननममममााााणणणण(cid:4)(cid:4)(cid:4)(cid:4) एएएएजजजजिि(cid:16)(cid:16)िि(cid:16)(cid:16) ससससययययाााांंंं िनमा2ण एज(cid:17)िसय* क(cid:25) संZय ा बढ़ाने क(cid:25) आव)य कता पर भी जोर 4दया जा रहा ह।ै पावर =ल ांट* और अCय अवसंरचना प3रयोजनाE के िलए इंजीिनय[रग, अिध<ािx और िविनमा2ण (ईपीसी) से संबंिधत कायU के िन!प ादन हते ु एनटीपीसी और बीएचईएल न े एक संयुdत उ#म ग3ठत 4कया ह।ै इस संयुdत उ#म को अभी हाल ही म(cid:17) बीओपी के िलए कुछ आदशे <ा=त ,ए ह।O मेकेिनकल उप8क र* के साथ िसिवल िनमा2ण क(cid:25) नवीनतम प(cid:23)ितय* और जनशिA का इ!ट तम सदपु योग जैसी प(cid:23)ितय* को अपनान े क(cid:25) आव)य कता ह।ै • जजजज////टटटटलललल ससससााााममममAAAAीीीी सीआरजीओ 8ट ील हायर \डे सीआरएनजीओ और िथक Iव ॉयलर 8ट ील =ल ेट को छोड़कर <मुख साम\ी क(cid:25) कमी <तीत नह(cid:7) होती ह।ै "ांसफाम2र के िविनमा2ण हते ु सामाCय त: कोjड रोjड \ेन ओ3रएटं ेड (सीआरजीओ) 8ट ील का <योग 4कया जाता ह।ै सीआरजीओ 8ट ील क(cid:25) कमी वैि]क 8त र पर ह ै और भारत म(cid:17) गुणवQत ायुdत सीआरजीओ 8ट ील क(cid:25) अनुपलIध ता के प3रणाम8व Nप "ांसफाम2र क(cid:25) आपूPत म (cid:17) िवलंब होता ह।ै इस सम8य ा से िनजात पान े के िलए िव#ुत <णािलय* के िव8त ार हते ु आव)य क ज3टल महQव पूण2 साम\ी (इनपुट) क(cid:25) समय पर उपलIध ता सुनिcत करने के िलए <यास 4कए जा रह े ह।O महQव पूण2 ज3टल इनपुट जैस े Iव ॉयलर गुणवQत ा =ल ेट, पी91 पाइJपग, सीआरजीओ सीट 8क (cid:25)म के िलए व(cid:17)डर िवकिसत करने हते ु <यास शुN 4कए जा रह े ह।O आयात क(cid:25) जाने वाली साम\ी के िलए अि\म आयोजना का सुझाव 4दया गया ह।ै टबा2इन/जनरेटर* क(cid:25) काJ8टग और फोXजग के िलए िविनमाण2 (cid:18)मताE के िवकास का भी सुझाव 4दया गया ह।ै बीएचईएल से अनुरोध 4कया गया ह ै 4क वह फोXजग और काJ8टग जैसे ज3टल उप8क र* क(cid:25) खरीद के िलए अि\म तौर पर कार2वाई करे dय *4क इनक(cid:25) खरीद म(cid:17) काफ(cid:25) अिधक समय लगता ह,ै िजससे 4क 4कसी यूिनट क(cid:25) 8थ ापना म(cid:17) लगने वाले समय को कम 4कया जा सके। इस मामले को सरकार के साथ उठाया गया 4क ज3टल फोXजग और काJ8टग क(cid:25) अि\म खरीद हते ु बीएचईएल को सलाह जारी क(cid:25) जाए। तदनुसार िवQत मंRालय aारा बीएचईएल को एक सलाह जारी क(cid:25) गई है, िजसस े 4क ज3टल फोXजग और काJ8टग क(cid:25) अि\म खरीद <4Bया को सकु र बनाया जा सके। • ििििववववIIIIततुुततुु (cid:26)(cid:26)(cid:26)(cid:26)KKेेKKेे मममम $$ $$जजजजननननशशशशििििRRRR औऔऔऔरररर (cid:1)(cid:1)(cid:1)(cid:1)ििििशशशश(cid:26)(cid:26)(cid:26)(cid:26)णणणण ससससििुुििुु ववववधधधधााााएएएए ंं ंं दशे म(cid:17) कुशल जनशिA क(cid:25) कमी ह।ै यह अनुमान लगाया गया था 4क 11व(cid:7) पंचवष(cid:12)य योजना के दौरान िविनमा2ण <चालन और िव#ुत उप8क र* के रखरखाव के िलए लगभग 1 िमिलयन अित3रdत कामगार, पय2वे(cid:18)क और इंजीिनयर* क(cid:25) आव)य कता होगी। िवशेष Nप से िविनyद!ट कौशल वाले तकनीिशयन* क(cid:25) भारी संZय ा म (cid:17) आव)य कता होगी। उपयु2dत सम8य ा को हल करने के िलए मानव संसाधन िवकास एवं िव#ुत (cid:18)ेR के काPमक* के <िश(cid:18)ण को उzच <ाथिमकता दी जा रही ह।ै महQव पूण2 मानव संसाधन* को आकPषत करने, उनका सदपु योग करने, िवकास और संर(cid:18)ण करने के िलए एक ब,त ही Kय ापक और सारगPभत पहल शुN क(cid:25) गई ह।ै आपूPत और मांग के बीच अंतर को दरू करन े के िलए ''4कसी आईटीआई को अपनाना’’ नामक एक योजना शुN क(cid:25) गई ह।ै इसका उ()े य नए तकनीिशयन* को <िशि(cid:18)त करना और मौजूदा तकनीिशयन* के कौशल को अ#तन करना ह।ै इस योजना के अनसु ार िव#तु प3रयोजना के िवकासकता2E aारा प3रयोजनाE के आसपास मौजूदा आईटीआई को गोद िलया जाता ह।ै केCf ीय िव#ुत <ािधकरण ने अभी हाल ही म(cid:17) उQप ादन और पारेषण प3रयोजनाE क(cid:25) प3रयोजना लागत म(cid:17) प3रयोजना (cid:18)ेR म (cid:17) और उसके आसपास कौशल िवकास क(cid:25) लागत को शािमल करन े के िलए रा!" ीय िव#ुत नीित, टै3रफ नीित और <ितयोगी बोली <4Bया 4दशािनदशh * म (cid:17) प3रवत2न करन े के िलए िव#ुत मंRालय स े िसफा3रश क(cid:25) ह।ै सीईए aारा सीईआरसी से भी अनुरोध 4कया गया ह ै 4क वह उQप ादन और पारेषण टै3रफ म(cid:17) एक पास { ू के Nप म(cid:17) प3रयोजना (cid:18)ेR म(cid:17) और उसके आसपास मानव संसाधन िवकास क(cid:25) लागत पर िवचार करे। ऐसा <8त ाव 4कया गया ह ै 4क इस मद के िलए <ावधान को वा8त िवक Kय य तक अथवा प3रयोजना लागत के एक पूव2 िविनyद!ट <ितशत, जो भी कम ह,ै तक सीिमत 4कया जाना चािहए। • ससससचचूूचचूू ननननाााा (cid:1)(cid:1)(cid:1)(cid:1)ौौौौIIIIोोोोििििगगगगकककक आआआआधधधधाााा////ररररतततत ििििननननगगगगररररााााननननीीीी सूचना <ौ#ोिगक(cid:25) आधा3रत िनगरानी एक ऐसी <णाली ह ै जो िनगरानी क(cid:25) जा रही प3रयोजना और काय2Bम* के बारे म(cid:17) सभी सूचना वा8त िवक समय आधार पर <ा=त करने म(cid:17) समथ2 बनाती है, इस <कार यह <बंधन के िविभCन¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 61 8त र* पर 3रपोट2 4कए जाने वाले ब,त स े महQव पूण2 मु(*, लागत वृि(cid:23) और अCय सबं ंिधत पहलुE को उजागर करने म(cid:17) सहायक ह।ै इसका सदपु योग जारी िव#ुत प3रयोजनाE क(cid:25) दिै नक <गित क(cid:25) िनगरानी करने और िविभCन एज(cid:17)िसय* स े 8व ीकृितयां <ा=त करने क(cid:25) <4Bया म(cid:17) तेजी लाने के िलए 4कया जाए। यह <णाली बीओपी/अCय उप8क र* के समय पर आदशे <8त ुत करने म(cid:17) भी सहायक होगी। यह <णाली संबंिधत <ािधकारी को इस बात से भी सावधान कर सकती ह ै 4क य4द कोई प3रयोजना िनधा23रत अनुसचू ी के अनुसार नह(cid:7) चल रही ह ै तो उसके aारा dय ा उपयुdत कार2वाई क(cid:25) जानी चािहए। सॉ|टवेयर के <योग से सूचना <ौ#ोिगक(cid:25) आधा3रत िनगरानी <णाली िविभCन भौगोिलक अवि8थितय* स े एक साथ ऑनलाइन अपडशे न को सुकर बनान े के िलए एल 1 और एल 2 8त र के नेटवकU को मा8ट र नेटवक2 के साथ एक(cid:25)कृत करेगी। सभी प3रयोजनाE और काय2Bम* क(cid:25) सिं (cid:18)=त डसै बोड 2 सूचना वा8त िवक समय आधार पर <ा=त क(cid:25) जा सकती ह।ै इस <कार यह <णाली यह सुिनिcत करने म(cid:17) भी सहायक होगी 4क कौन सी प3रयोजनाए ं िवलंब से चल रही ह/O दरे स े पूरी ह*गी और 4कनका <चालन िनधा23रत बजट स े अिधक बजट पर 4कया जा रहा ह।ै यह <णाली अCय बात* के साथ साथ िनbन िलिखत के साथ भी सहायक होगी। • इंजीिनय[रग िवभाग aारा <Qय ेक rाइंग जारी करने/अनुमोदन <दान करने क(cid:25) वा8त िवक तारीख का ऑनलाइन अ#तनीकरण इस ढंग से सुिनिcत करना 4क सभी संबंिधत* aारा उसका आसानी से अिभगम 4कया जा सके। • उन प3रवहन/संभार तंR संबधं ी काय2कलाप* क(cid:25) ऑनलाइन िनगरानी को समथ 2 बनाना जो प3रयोजनाE क(cid:25) समय पर 8थ ापना के िलए महQव पूण2 ह।O • कमजोर प3रयोजना िन!प ादन और काय2कलाप* के अनिु चत Bम क(cid:25) िनगरानी करना • प3रयोजना िवलंब, लागत बढ़ना • अनुसूची और साम\ी <दायगी पर नजर रखना • लागत बढ़ना, साम\ी क(cid:25) लागत बढ़ने से अwात िवव(cid:18)ाए ं • संसाधन* का अपया2=त <योग, गलत कौशल िम}ण, प3रयोजना िवलंब <भावी प3रयोजना िनगरानी और काया2Cव यन के िलए सभी प3रयोजनाE से आईटी आधा3रत िनगरानी <णाली को लागू करने के िलए अनरु ोध 4कया गया। हालां4क कुछ ही प3रयोजनाE ने इसे लागू 4कया ह।ै इसे सभी प3रयोजनाE aारा लागू करना आव)य क ह।ै केCf ीय िव#ुत <ािधकरण न े वेब आधा3रत अतं रापृ!ठ के ज3रए दशे म(cid:17) िविभCन िव#ुत उQप ादन, पारेषण और िवतरण कंपिनय* से केCf ीय Nप से डटे ा सं\हण के िलए एक(cid:25)कृत <बंधन <णाली-। (आईएमएस-।) काया2िCवत क(cid:25) ह।ै सीईए ने आईएमएस से संबंिधत इनपुट फॉमhट और 3रपोटU को अनुमो4दत कर 4दया ह ै और संगत संगठन* से इनपुट फामhट म(cid:17) इसे लागू करने क(cid:25) तारीख <ा=त क(cid:25) जा रही ह।ै सीईए िनbन िलिखत Kय ापक उ()े य * के साथ आईएमएस-।। को भी कायाि2 Cवत करने वाला ह:ै - • िव#ुत प3रयोजनाE के 4BयाCव यन क(cid:25) अिधक सघन और Kय ापक सूचना <ौ#ोिगक(cid:25) आधा3रत िनगरानी। • <णाली क(cid:25) िव)व सनीयता और उपलIध ता बढ़ाने के िलए मौजूदा डटे ा स(cid:17)टर म(cid:17) पया2= त माRा म(cid:17) कम2चारी उपलIध कराना और एक अलग आपदा 3रकवरी डटे ा स(cid:17)टर तैयार करना। चूं4क 12व(cid:7) पंचवष(cid:12)य योजना के दौरान 8थ ािपत क(cid:25) जाने वाली ब,त सी प3रयोजनाए ं बड़ े आकार वाली ह*गी, अत: जारी प3रयोजनाE से संबंिधत उQप ादन 3रपोट2 और िनगरानी क(cid:25) दिृ ~ से सूचना <ौ#ोिगक(cid:25) आधा3रत िनगरानी <णाली उपयोगी सािबत होगी। • SSSSधधधधनननन ससससबबंंबबंं धधंंधधंं ीीीी बबबबााााधधधधााााएएएए ंंंं (cid:1) कुछ प3रयोजनाE म(cid:17) कोयला, गैस और Cय ूिdलयर nधन क(cid:25) अनुपलIध ता के कारण िवलंब ,आ ह।ै (cid:1) आं(cid:127) <दशे म(cid:17) कोनासीमा (445मेगावाट) और गौथामी (464 मेगावाट), जो 8थ ापना के िलए तैयार थ(cid:7), परंतु गैस क(cid:25) अनुपलIध ता के कारण उनके <चालन म(cid:17) िवलंब ,आ। अब इन प3रयोजनाE के िलए केजी डी6 बेिसन से गैस आवं3टत कर दी गई ह ै और इनक(cid:25) 8थ ापना 2009-10 के दौरान पूरी कर ली गई ह।ै (cid:1) 220 मेगावाट (cid:18)मता वाली आरएपीपी यूिनट 5 और 6 क(cid:25) 8थ ापना पहले ही कर ली गई ह ै dय *4क इन यूिनट* के िलए अब आयाितत Cय ूिdलयर nधन उपलIध ह।ै62 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] (cid:1) उपयु2dत के अलावा गैस क(cid:25) अनुपलIध ता के कारण 11व(cid:7) पंचवष(cid:12)य योजना के दौरान कुछ गैस आधा3रत िव#ुत प3रयोजनाE क(cid:25) 8थ ापना नह(cid:7) क(cid:25) जा सकV। गुजरात म(cid:17) हजीरा सीसीजीटी (351 मेगावाट) गैस िव#ुत प3रयोजना क(cid:25) 8थ ापना 11व(cid:7) पंचवष(cid:12)य योजना के दौरान (माच2, 2012) म(cid:17) क(cid:25) गई जो वत2मान म(cid:17) गैस क(cid:25) अनुपलIध ता के कारण बंद पड़ी ,ई ह।ै • ससससििंंििंं ववववददददाााागगगगतततत ििििववववववववाााादददद 10व(cid:7) पंचवष(cid:12)य योजना अविध के दौरान िनधा23रत मूjय संिवदा आधार पर स€पी गई। ब,त सी संिवदाए ं आव)य क साम\ी (इनपुट) के मूjय म(cid:17) अनापेि(cid:18)त वृि(cid:23) के कारण बुरी तरह <भािवत ,ई। सीईए ने सभी िव#तु कंपिनय* को भिव!य म(cid:17) ऐसी सभी संिवदाए,ं िजनके काया2Cव यन क(cid:25) अविध काफ(cid:25) लंबी ह,ै िनधा23रत मूjय संिवदा आधार पर न स€पने क(cid:25) सलाह दी। िव#ुत कंपिनय* के माग2दश2न हते ु उपयुdत मूjय गणना सूR के साथ एक मॉडल nLrk संिवदा वेज प3रचािलत 4कया गया। िव#ुत मंRालय और केCf ीय िव#ुत <ािधकरण aारा नई 4दjल ी म(cid:17) 4दनांक 16 नवबं र, 2007 को ''''''''जजजजलललल ििििववववIIIIततुुततुु पपपप////ररररययययोोोोजजजजननननाााा???? ककककेेेे NNNNवव वव ////ररररतततत ििििववववककककाााासससस ककककेेेे ििििललललएएएए ससससििंंििंं ववववददददाााा (cid:1)(cid:1)(cid:1)(cid:1)बबबबधधंंधधंं नननन’’’’’’’’ िवषय पर आयोिजत एक 4दवसीय अंतरा2!" ीय सbम ेलन के दौरान यह गणना क(cid:25) गई 4क मौजूदा संिवदा द8त ावेज* और <बंधन <णािलय*/<4BयाE म(cid:17) खािमयां ह,O िजनके प3रणवाम8व Nप संिवदागत के बाद पैदा होते ह O और जल िव#ुत प3रयोजनाE का िवकास <भािवत होता ह।ै सभी पणधारक* aारा अपनाए जाने के िलए 4दशािनदशh के Nप म(cid:17) मानक द8त ावेज तैयार करने क(cid:25) आव)य कता महसूस क(cid:25) गई। इसके अनुBम म(cid:17) िव#तु मंRालय, भारत सरकार aारा केCf ीय िव#ुत <ािधकरण के चेयरपस2न क(cid:25) अ(cid:2)य (cid:18)ता म (cid:17) एक काय2बल ग3ठत 4कया गया, िजसम(cid:17) िव#ुत कंपिनय*, िवकासकता2E के <ितिनिध और परामश2दाताE को सद8य के Nप म(cid:17) शािमल 4कया गया। िनमा2ण उ#ोग िवकास प3रषद (सीआईडीसी) क(cid:25) सेवाए ं इस <योजन से ली गn। मसौदा द8त ावेज को अंितम Nप 4दया गया ह ै और 8व ीकृित के िलए िव#तु मंRालय को भेजा गया ह।ै मानक बोली द8त ावजे * (एसबीडी) म (cid:17) महQव पणू 2 घटक*/सकं jप नाE को शािमल करन े के साथ साथ िनbन िलिखत त(cid:129)य * को भी शािमल 4कया गया ह ै : i. जजजजोोोोििििखखखखमममम ररररििििजजजज(cid:2)(cid:2)(cid:2)(cid:2)टट टट रररर :::: ऐसा दखे ा जाता ह ै 4क oय ादातर जल िव#ुत प3रयोजनाE के िवकास म(cid:17) संिवदागत मु(* के कारण िवलंब होता ह,ै जो िवशेष Nप से अwात ि8थितय* के प3रणाम8व Nप उQप C न होने वाले जोिखम Kय य को साझा करने के कारण पैदा होते ह।O एक जोिखम रिज8ट र <ोफामा2 तैयार 4कया गया ह,ै िजसम(cid:17) जल िव#ुत प3रयोजनाE के सम(cid:18) सामाCय त: पैदा होन े वाले िविभCन <कार के जोिखम* को साझा करने/आवं3टत करन े का <ावधान 4कया गया ह।ै ऐसी अपे(cid:18)ा ह ै 4क इस <ोफामा2 को अपनान े स े िनयोdत ा और संिवदाकार* के बीच संिवदागत िववाद काफ(cid:25) हद तक कम हो जाएगं े। ii. सससस(cid:2)(cid:2)ंं(cid:2)(cid:2)ंं थथ थथ ाााागगगगतततत ममममाााा((((यय यय (cid:2)(cid:2)(cid:2)(cid:2)थथ थथ मममम TTTTयय यय वववव(cid:2)(cid:2)(cid:2)(cid:2)थथ थथ ाााा :::: तेजी से और द(cid:18)तापूव2क िववाद िनपटान सुिनिcत करने के िलए सं8थ ागत िववाद समाधान तंR का <8त ाव 4कया गया ह,ै जो विै ]क 8त र पर उभरकर सामने आ रही सव2}े!ठ <4BयाE पर आधा3रत ह।ै वैि]क 8त र पर दघु 2टनाE क(cid:25) (cid:18)ितपूPत और दाव* के िन!प (cid:18) एवं समय पर िनधा2रण पर अिधक जोर 4दए जाने के कारण सं8थ ागत मा(cid:2)य 8थ म तंR क(cid:25) ओर Tझान बढ़ा ह ै जो िववाद* के समय पर समाधान के िलए अपे(cid:18)ाकृत अिधक जवाबदहे और पारदश(cid:12) <4Bया सुिनिcत करन े म(cid:17) सहायक ह।ै उउउउपपपपयययय(cid:28)(cid:28)ुु(cid:28)(cid:28)ुु तततत ढढढढंगंगंगंग सससस ेे ेेशशशशााााििििममममलललल ****ककककएएएए गगगगएएएए////ससससशशंंशशंं ोोोोििििधधधधतततत ****ककककएएएए गगगगएएएए अअअअ(cid:24)(cid:24)(cid:24)(cid:24)यय यय eqn~~nksa ककककेेेे ससससााााथथथथ ससससााााथथथथ इइइइससससमममम (cid:16)(cid:16) (cid:16)(cid:16)ििििनननन----नननन ििििललललििििखखखखतततत eqn~~nksa ककककोोोो भभभभीीीी शशशशााााििििममममलललल ****ककककययययाााा iiiiiiiiiiii.... गगगगययययाााा हहहह ैै ैै:::: (cid:2) संसाधन के बेकार होने क(cid:25) ि8थित म(cid:17) दावा, (cid:2) लागत िनयंRण, (cid:2) दाव* के िलए <4Bयाए,ं (cid:2) क(cid:25)मत समायोजन फामू2ला, (cid:2) <ोQस ाहन बोनस, (cid:2) संिवदा के िनलंबन /िनधा23रत समय से पहले समािx पर भुगतान¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 63 iiiivvvv.... ससससममममीीीी(cid:26)(cid:26)(cid:26)(cid:26)ाााा ससससििििममममिििितततत ककककाााा (cid:1)(cid:1)(cid:1)(cid:1)ााााववववधधधधाााानननन – म(cid:2)य ाविध संशोधन के िलए मानक बोली द8त ावेज* (एसबीडी) और अCय द8त ावेज* क(cid:25) आविधक समी(cid:18)ा के उ()े य से एक समी(cid:18)ा सिमित के गठन का <8त ाव 4कया गया ह।ै कानूनी िवधी(cid:18)ा के प)च ात मानक बोली द8त ावेज* को अंितम Nप 4दया गया ह ै और िव#ुत मंRालय को भेजे गए ह।O • ममममााााननननकककक1111ककककररररणणणण :::: केCf ीय िव#ुत <ािधकरण aारा थम2ल प3रयोजनाE के िडजाइन और इंजीिनय[रग तथा काया2Cव यन म(cid:17) लगने वाल े समय को कम करने के उ()े य से सब 4B3टकल <ौ#ोिगक(cid:25) के साथ 500 मेगावाट और उससे अिधक (cid:18)मा वाले 8ट ीम जनरेटर और टबा2इन जनरेटर के िलए मानक िविनदशh तैयार 4कए गए। सुपर4B3टकल यूिनट* और बकाया =ल ांट* (बीओपी) के िलए भी मानक िविनदशh तैयार 4कए जा रह े ह।O ********************64 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] अअअअननननबबुुबबुु धधंंधधंं 2222....1111 11111111वववव!!!! पपपपचचचचंंंं ववववषषषष1111यययय ययययोोोोजजजजननननाााा कककक2222 रररराााा3333यययय ववववाााारररर////444455ेे55ेे ववववाााारररर 4444ममममतततताााा अअअअििििभभभभववववििृृििृृ 7777 लललल8888यय यय ////उउउउपपपपललललिििि9999धधधधययययाााा ंंंं लललल(cid:6)(cid:6)(cid:6)(cid:6)यय यय मममम(cid:9)(cid:9)(cid:9)(cid:9)यय यय ााााववववििििधधधध मममम(cid:15)(cid:15)ूू(cid:15)(cid:15)ूू यय यय ााााककंंककंं नननन ((((एएएएममममटटटटीीीीएएएए)))) लललल(cid:6)(cid:6)(cid:6)(cid:6)यय यय ----77778888,,,,777700000000 ममममगगेेगगेे ााााववववााााटटटट 33331111....00003333....2222000011112222 ततततकककक उउउउपपपपललललिििि(cid:21)(cid:21)(cid:21)(cid:21)धधधधययययाााा ंं ंं ककककेेेे अअअअननननससुुससुु ाााारररर----66662222,,,,333377774444 ममममगगेेगगेे ााााववववााााटटटट (cid:22)(cid:22)(cid:22)(cid:22)....सससस..ंं..ंं रररराााा(cid:24)(cid:24)(cid:24)(cid:24)यय यय //// ससससघघंंघघंं ााााशशशशााााििििससससतततत (cid:1)(cid:1)(cid:1)(cid:1)(cid:3)(cid:3)ेे(cid:3)(cid:3)ेे ससससीीीीएएएएसससस एएएएससससएएएएसससस पपपपीीीीएएएएसससस जजजजोोोोड़ड़ड़ड़ ससससीीीीएएएएसससस एएएएससससएएएएसससस पपपपीीीीएएएएसससस जजजजोोोोड़ड़ड़ड़ ससससीीीीएएएएसससस एएएएससससएएएएसससस पपपपीीीीएएएएसससस जजजजोोोोड़ड़ड़ड़ (cid:2)(cid:1) (cid:22)द(cid:24)ल ी(cid:1) (cid:4)(cid:1) (cid:2)(cid:3)(cid:4)(cid:4)(cid:1) (cid:4)(cid:1) (cid:2)(cid:3)(cid:4)(cid:4)(cid:1) (cid:4)(cid:1) (cid:2)(cid:3)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:9)(cid:1) (cid:2)(cid:10)(cid:4)(cid:9)(cid:1) (cid:4)(cid:1) (cid:5)(cid:3)(cid:4)(cid:1) (cid:2)(cid:4)(cid:9)(cid:1) (cid:9)(cid:3)(cid:9)(cid:1) (cid:7)(cid:1) ह(cid:26)रयाणा(cid:1) (cid:2)(cid:3)(cid:4)(cid:4)(cid:1) (cid:2)(cid:9)(cid:4)(cid:4)(cid:1) (cid:4)(cid:1) (cid:11)(cid:11)(cid:4)(cid:4)(cid:1) (cid:2)(cid:3)(cid:4)(cid:4)(cid:1) (cid:2)(cid:9)(cid:4)(cid:4)(cid:1) (cid:4)(cid:1) (cid:11)(cid:11)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:9)(cid:4)(cid:4)(cid:1) (cid:10)(cid:10)(cid:4)(cid:1) (cid:11)(cid:6)(cid:10)(cid:4)(cid:1) (cid:11)(cid:1) (cid:13)(cid:14)(cid:15)(cid:16)(cid:17)(cid:18)(cid:1)(cid:28)देश(cid:1) (cid:7)(cid:5)(cid:10)(cid:11)(cid:1) (cid:7)(cid:2)(cid:4)(cid:1) (cid:2)(cid:6)(cid:10)(cid:7)(cid:1) (cid:6)(cid:6)(cid:11)(cid:3)(cid:1) (cid:5)(cid:3)(cid:2)(cid:1) (cid:4)(cid:1) (cid:2)(cid:11)(cid:10)(cid:7)(cid:1) (cid:7)(cid:2)(cid:2)(cid:11)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:2)(cid:7)(cid:8)(cid:7)(cid:1) (cid:2)(cid:7)(cid:8)(cid:7)(cid:1) (cid:6)(cid:1) ज(cid:30)म ू(cid:1)और क"म ी(cid:12)(cid:1) (cid:6)(cid:6)(cid:8)(cid:1) (cid:6)(cid:3)(cid:4)(cid:1) (cid:4)(cid:1) (cid:9)(cid:8)(cid:8)(cid:1) (cid:6)(cid:6)(cid:8)(cid:1) (cid:6)(cid:3)(cid:4)(cid:1) (cid:4)(cid:1) (cid:9)(cid:8)(cid:8)(cid:1) (cid:2)(cid:7)(cid:4)(cid:1) (cid:6)(cid:3)(cid:4)(cid:1) (cid:4)(cid:1) (cid:3)(cid:5)(cid:4)(cid:1) (cid:3)(cid:1) (cid:19)(cid:20)(cid:21)(cid:16)(cid:22)(cid:1) (cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:10)(cid:1) राज(cid:21)थ ा(cid:23)(cid:1) (cid:10)(cid:8)(cid:4)(cid:1) (cid:2)(cid:5)(cid:8)(cid:4)(cid:1) (cid:2)(cid:4)(cid:9)(cid:4)(cid:1) (cid:11)(cid:3)(cid:10)(cid:4)(cid:1) (cid:10)(cid:8)(cid:4)(cid:1) (cid:2)(cid:7)(cid:8)(cid:4)(cid:1) (cid:2)(cid:4)(cid:9)(cid:4)(cid:1) (cid:11)(cid:4)(cid:10)(cid:4)(cid:1) (cid:10)(cid:8)(cid:4)(cid:1) (cid:2)(cid:7)(cid:8)(cid:4)(cid:1) (cid:3)(cid:6)(cid:4)(cid:1) (cid:7)(cid:3)(cid:7)(cid:4)(cid:1) (cid:5)(cid:1) उ%त (cid:12)(cid:1)(cid:28)देश(cid:1) (cid:8)(cid:9)(cid:4)(cid:1) (cid:7)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:10)(cid:4)(cid:4)(cid:1) (cid:6)(cid:3)(cid:9)(cid:4)(cid:1) (cid:8)(cid:9)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:9)(cid:4)(cid:4)(cid:1) (cid:11)(cid:5)(cid:9)(cid:4)(cid:1) (cid:8)(cid:9)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:9)(cid:3)(cid:4)(cid:1) (cid:6)(cid:4)(cid:9)(cid:4)(cid:1) (cid:9)(cid:1) उ%त (cid:12)(cid:16)(cid:24)(cid:20)(cid:25)(cid:1) (cid:2)(cid:3)(cid:7)(cid:4)(cid:1) (cid:11)(cid:4)(cid:6)(cid:1) (cid:11)(cid:11)(cid:4)(cid:1) (cid:7)(cid:2)(cid:3)(cid:6)(cid:1) (cid:6)(cid:4)(cid:4)(cid:1) (cid:11)(cid:4)(cid:6)(cid:1) (cid:4)(cid:1) (cid:5)(cid:4)(cid:6)(cid:1) (cid:6)(cid:4)(cid:4)(cid:1) (cid:11)(cid:4)(cid:6)(cid:1) (cid:4)(cid:1) (cid:5)(cid:4)(cid:6)(cid:1) (cid:8)(cid:1) (cid:17)(cid:20)(cid:25)(cid:26)(cid:27)(cid:28)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) उउउउपपपप जजजजोोोोड़ड़ड़ड़ उउउउ!!!!तत तत ररररीीीी (cid:22)(cid:22)(cid:22)(cid:22)(cid:23)(cid:23)ेे(cid:23)(cid:23)ेे 7777999900002222 8888555555554444 4444444477772222 22220000999922228888 4444777777770000 6666888844444444 4444333355550000 11115555999966664444 3333111199990000 5555333344444444 5555444455550000 11113333999988884444 (cid:2)(cid:4)(cid:1) छ%त ी(cid:29)(cid:27)(cid:28)(cid:1) (cid:11)(cid:8)(cid:9)(cid:4)(cid:1) (cid:2)(cid:5)(cid:3)(cid:4)(cid:1) (cid:2)(cid:10)(cid:4)(cid:4)(cid:1) (cid:5)(cid:11)(cid:11)(cid:4)(cid:1) (cid:7)(cid:4)(cid:4)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:2)(cid:10)(cid:4)(cid:4)(cid:1) (cid:11)(cid:9)(cid:3)(cid:4)(cid:1) (cid:11)(cid:11)(cid:7)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:2)(cid:9)(cid:11)(cid:11)(cid:1) (cid:3)(cid:6)(cid:4)(cid:11)(cid:1) (cid:2)(cid:2)(cid:1) (cid:27)(cid:30)(cid:21)(cid:12)(cid:16)(cid:31)(cid:1) (cid:4)(cid:1) (cid:7)(cid:5)(cid:9)(cid:7)(cid:1) (cid:7)(cid:6)(cid:6)(cid:9)(cid:1) (cid:3)(cid:7)(cid:11)(cid:4)(cid:1) (cid:4)(cid:1) (cid:7)(cid:7)(cid:9)(cid:7)(cid:1) (cid:3)(cid:7)(cid:6)(cid:9)(cid:1) (cid:5)(cid:3)(cid:11)(cid:4)(cid:1) (cid:4)(cid:1) (cid:2)(cid:4)(cid:8)(cid:4)(cid:1) (cid:5)(cid:2)(cid:10)(cid:9)(cid:1) (cid:9)(cid:7)(cid:3)(cid:9)(cid:1) (cid:2)(cid:7)(cid:1) महारा’( (cid:1) (cid:2)(cid:5)(cid:6)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:4)(cid:1) (cid:2)(cid:6)(cid:3)(cid:4)(cid:1) (cid:3)(cid:10)(cid:8)(cid:4)(cid:1) (cid:5)(cid:6)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:4)(cid:1) (cid:7)(cid:2)(cid:2)(cid:4)(cid:1) (cid:3)(cid:11)(cid:3)(cid:4)(cid:1) (cid:5)(cid:6)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:4)(cid:1) (cid:7)(cid:7)(cid:11)(cid:10)(cid:1) (cid:3)(cid:6)(cid:5)(cid:10)(cid:1) (cid:2)(cid:11)(cid:1) म)य (cid:1)(cid:28)देश(cid:1) (cid:3)(cid:7)(cid:4)(cid:1) (cid:7)(cid:7)(cid:2)(cid:4)(cid:1) (cid:6)(cid:4)(cid:4)(cid:1) (cid:11)(cid:2)(cid:11)(cid:4)(cid:1) (cid:3)(cid:7)(cid:4)(cid:1) (cid:5)(cid:2)(cid:4)(cid:1) (cid:6)(cid:4)(cid:4)(cid:1) (cid:2)(cid:10)(cid:11)(cid:4)(cid:1) (cid:3)(cid:7)(cid:4)(cid:1) (cid:5)(cid:2)(cid:4)(cid:1) (cid:4)(cid:1) (cid:2)(cid:7)(cid:11)(cid:4)(cid:1) (cid:2)(cid:6)(cid:1) (cid:27) !(cid:16)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:2)(cid:3)(cid:1) "(cid:15)#(cid:1)$!(cid:20)(cid:1)"(cid:26)!(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:2)(cid:10)(cid:1) "(cid:16)"(cid:12)(cid:1)$!(cid:20)(cid:1)(cid:23)(cid:27)(cid:12)(cid:1)(cid:14)!%(cid:18)(cid:26)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) उउउउपपपप जजजजोोोोड़ड़ड़ड़ पपपपिििि####ममममीीीी (cid:22)(cid:22)(cid:22)(cid:22)(cid:23)(cid:23)ेे(cid:23)(cid:23)ेे 6666222244440000 9999222244442222 5555888899998888 22221111333388880000 3333222266660000 5555777744442222 9999333355558888 11118888333366660000 4444555588880000 4444555555550000 11111111222233337777 22220000333366667777 (cid:2)(cid:5)(cid:1) आं,(cid:1)(cid:28)देश(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:11)(cid:4)(cid:10)(cid:6)(cid:1) (cid:8)(cid:4)(cid:8)(cid:1) (cid:6)(cid:8)(cid:5)(cid:11)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:7)(cid:7)(cid:4)(cid:6)(cid:1) (cid:2)(cid:7)(cid:5)(cid:3)(cid:1) (cid:6)(cid:6)(cid:5)(cid:8)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:7)(cid:2)(cid:3)(cid:6)(cid:1) (cid:2)(cid:6)(cid:7)(cid:3)(cid:1) (cid:6)(cid:3)(cid:5)(cid:8)(cid:1) (cid:2)(cid:9)(cid:1) कना-टक(cid:1) (cid:6)(cid:6)(cid:4)(cid:1) (cid:2)(cid:6)(cid:9)(cid:4)(cid:1) (cid:2)(cid:10)(cid:2)(cid:3)(cid:1) (cid:11)(cid:3)(cid:11)(cid:3)(cid:1) (cid:6)(cid:6)(cid:4)(cid:1) (cid:2)(cid:6)(cid:9)(cid:4)(cid:1) (cid:2)(cid:10)(cid:2)(cid:3)(cid:1) (cid:11)(cid:3)(cid:11)(cid:3)(cid:1) (cid:6)(cid:6)(cid:4)(cid:1) (cid:2)(cid:6)(cid:9)(cid:4)(cid:1) (cid:2)(cid:9)(cid:4)(cid:4)(cid:1) (cid:11)(cid:5)(cid:7)(cid:4)(cid:1) (cid:2)(cid:8)(cid:1) &%(cid:12)(cid:18)(cid:1) (cid:4)(cid:1) (cid:2)(cid:10)(cid:4)(cid:1) (cid:4)(cid:1) (cid:2)(cid:10)(cid:4)(cid:1) (cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:1) (cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:1) (cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:1) (cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:1) (cid:7)(cid:4)(cid:1) (cid:31)(cid:13)(cid:15)(cid:18)(cid:23)(cid:16)(cid:25)(cid:30)(cid:1) (cid:3)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:7)(cid:3)(cid:7)(cid:1) (cid:4)(cid:1) (cid:10)(cid:7)(cid:3)(cid:7)(cid:1) (cid:6)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:8)(cid:3)(cid:7)(cid:1) (cid:4)(cid:1) (cid:3)(cid:8)(cid:3)(cid:7)(cid:1) (cid:5)(cid:3)(cid:4)(cid:1) (cid:8)(cid:7)(cid:1) (cid:4)(cid:1) (cid:9)(cid:6)(cid:7)(cid:1) (cid:7)(cid:2)(cid:1) (cid:19)(cid:16)(cid:20)(cid:13)(cid:25)(cid:17)%(cid:12)(cid:26)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) उउउउपपपप जजजजोोोोड़ड़ड़ड़ ददददिििि(cid:22)(cid:22)(cid:22)(cid:22)णणणणीीीी (cid:22)(cid:22)(cid:22)(cid:22)(cid:23)(cid:23)ेे(cid:23)(cid:23)ेे 6666444444440000 5555999955556666 2222555522224444 11114444999922220000 5555444444440000 5555777733336666 2222888899990000 11114444000066666666 2222111199990000 3333888822226666 3333222222225555 9999222244441111 (cid:7)(cid:7)(cid:1) (cid:13)(cid:22)(cid:14)(cid:16)(cid:12)(cid:1) (cid:6)(cid:11)(cid:8)(cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:6)(cid:11)(cid:8)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:7)(cid:11)(cid:1) ’(cid:16)(cid:12)(cid:24)(cid:20)(cid:25)(cid:1) (cid:11)(cid:4)(cid:3)(cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:11)(cid:4)(cid:3)(cid:4)(cid:1) (cid:2)(cid:3)(cid:4)(cid:4)(cid:1) (cid:4)(cid:1) (cid:2)(cid:4)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:3)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:4)(cid:1) (cid:2)(cid:4)(cid:3)(cid:4)(cid:1) (cid:7)(cid:4)(cid:3)(cid:4)(cid:1) (cid:7)(cid:6)(cid:1) ()(cid:26)(cid:29)(cid:16)(cid:1) (cid:4)(cid:1) (cid:2)(cid:3)(cid:4)(cid:1) (cid:10)(cid:4)(cid:4)(cid:1) (cid:5)(cid:3)(cid:4)(cid:1) (cid:4)(cid:1) (cid:2)(cid:3)(cid:4)(cid:1) (cid:2)(cid:7)(cid:4)(cid:4)(cid:1) (cid:2)(cid:11)(cid:3)(cid:4)(cid:1) (cid:4)(cid:1) (cid:2)(cid:3)(cid:4)(cid:1) (cid:2)(cid:9)(cid:4)(cid:4)(cid:1) (cid:2)(cid:8)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:1) िस(cid:22)0म(cid:1) (cid:3)(cid:2)(cid:4)(cid:1) (cid:4)(cid:1) (cid:2)(cid:7)(cid:8)(cid:8)(cid:1) (cid:2)(cid:9)(cid:4)(cid:8)(cid:1) (cid:3)(cid:2)(cid:4)(cid:1) (cid:4)(cid:1) (cid:10)(cid:8)(cid:8)(cid:1) (cid:2)(cid:7)(cid:4)(cid:8)(cid:1) (cid:3)(cid:2)(cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:3)(cid:2)(cid:4)(cid:1)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 65 (cid:7)(cid:10)(cid:1) पि2म(cid:1)(cid:22)(cid:20)(cid:27)(cid:16)(cid:18)(cid:1) (cid:6)(cid:7)(cid:6)(cid:7)(cid:1) (cid:7)(cid:5)(cid:7)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:5)(cid:7)(cid:2)(cid:7)(cid:1) (cid:6)(cid:7)(cid:6)(cid:7)(cid:1) (cid:7)(cid:5)(cid:7)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:5)(cid:7)(cid:2)(cid:7)(cid:1) (cid:7)(cid:5)(cid:3)(cid:4)(cid:1) (cid:7)(cid:5)(cid:7)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:3)(cid:5)(cid:7)(cid:4)(cid:1) उउउउपपपप जजजजोोोोड़ड़ड़ड़ पपपपूवूवूवूव$$$$ (cid:22)(cid:22)(cid:22)(cid:22)(cid:23)(cid:23)ेे(cid:23)(cid:23)ेे 11112222111199992222 2222888877770000 2222111144449999 11117777222211111111 7777222255552222 2222888877770000 3333111199999999 11113333333322221111 5555222266660000 2222888877770000 3333111100000000 11111111222233330000 (cid:7)(cid:5)(cid:1) अ3णाचल(cid:1)(cid:28)देश(cid:1) (cid:7)(cid:10)(cid:4)(cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:7)(cid:10)(cid:4)(cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:7)(cid:9)(cid:1) *(cid:29)(cid:15)(cid:1) (cid:5)(cid:3)(cid:4)(cid:1) (cid:11)(cid:5)(cid:1) (cid:4)(cid:1) (cid:5)(cid:9)(cid:5)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:11)(cid:5)(cid:1) (cid:4)(cid:1) (cid:3)(cid:11)(cid:5)(cid:1) (cid:4)(cid:1) (cid:11)(cid:5)(cid:1) (cid:4)(cid:1) (cid:11)(cid:5)(cid:1) (cid:7)(cid:8)(cid:1) (cid:15)(cid:13)#(cid:19)(cid:30)(cid:12)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:11)(cid:4)(cid:1) (cid:13)(cid:15)(cid:21) (cid:12)(cid:15)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:11)(cid:2)(cid:1) (cid:15)%+(cid:16)(cid:18),(cid:1) (cid:4)(cid:1) (cid:2)(cid:7)(cid:6)(cid:1) (cid:4)(cid:1) (cid:2)(cid:7)(cid:6)(cid:1) (cid:4)(cid:1) (cid:2)(cid:7)(cid:10)(cid:1) (cid:4)(cid:1) (cid:2)(cid:7)(cid:10)(cid:1) (cid:4)(cid:1) (cid:9)(cid:6)(cid:1) (cid:4)(cid:1) (cid:9)(cid:6)(cid:1) (cid:11)(cid:7)(cid:1) नागाल6ड(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:11)(cid:11)(cid:1) ि(cid:9)पुरा(cid:1) (cid:5)(cid:3)(cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:5)(cid:3)(cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:7)(cid:2)(cid:1) (cid:4)(cid:1) (cid:7)(cid:2)(cid:1) उउउउपपपप जजजजोोोोड़ड़ड़ड़ उउउउ!!!!तत तत ररररीीीी पपपपिििि####ममममीीीी (cid:22)(cid:22)(cid:22)(cid:22)(cid:23)(cid:23)ेे(cid:23)(cid:23)ेे 4444111100000000 111166661111 0000 4444222266661111 555500000000 111166663333 0000 666666663333 0000 111144442222 0000 111144442222 (cid:11)(cid:6)(cid:1) अ9ड (cid:15)(cid:16)(cid:23)(cid:1)िनकोबार <ीप समूह(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:11)(cid:3)(cid:1) ल(cid:8)<ीप(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) (cid:4)(cid:1) जजजजोोोोड़ड़ड़ड़ 33336666888877774444 22226666777788883333 11115555000044443333 77778888777700000000 22221111222222222222 22221111333355555555 11119999777799997777 66662222333377774444 11115555222222220000 11116666777733332222 22223333000011112222 55554444999966664444 ससससीीीीएएएएसससस :::: ककककेेेे****88 88 ीीीीयययय (cid:10)(cid:10)(cid:10)(cid:10)99ेे99ेे ;;;; एएएएससससएएएएसससस :::: रररराााा::::यय यय (cid:10)(cid:10)(cid:10)(cid:10)99ेे99ेे ;;;; पपपपीीीीएएएएसससस :::: &&&&थथ थथ ााााििििपपपपतततत अअअअननननबबुुबबुु धधंंधधंं ----2222....2222 11111111वववव!!!! पपपपचचचचंंंं ववववषषषष1111यययय ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन ;;;;थथ थथ ााााििििपपपपतततत पपपप<<<<ररररययययोोोोजजजजननननाााा==== कककक2222 ससससचचचचूूूू ीीीी 77778888,,,,777700000000 66662222,,,,333377774444 (cid:22)(cid:22)(cid:22)(cid:22).... सससस...ंं.ंं (cid:28)(cid:28)(cid:28)(cid:28)लल लल ााााटटंंटटंं ककककाााा ननननाााामममम रररराााा(cid:24)(cid:24)(cid:24)(cid:24)यय यय एएएएजजजजसस(cid:31)(cid:31)सस(cid:31)(cid:31) ीीीी (cid:1)(cid:1)(cid:1)(cid:1)(cid:3)(cid:3)ेे(cid:3)(cid:3)ेे िििि!!!!थथथथिििितततत ####धधधधनननन ककककाााा (cid:1)(cid:1)(cid:1)(cid:1)ममममतततताााा ममममेगेगेगेगााााववववााााटटटट ममममेगेगेगेगााााववववााााटटटट !!!!थथ थथ ााााििििपपपपतततत ((((ममममेगेगेगेगााााववववााााटटटट)))) (cid:1)(cid:1)(cid:1)(cid:1)ममममतततताााा %%%%ककककाााारररर ककककेेेे अअअअननननससुुससुु ाााारररर ककककेेेे अअअअननननससुुससुु ाााारररर (cid:1)(cid:1)(cid:1)(cid:1)ममममतततताााा (cid:1)(cid:1)(cid:1)(cid:1)ममममतततताााा ककककेेेे(cid:18)(cid:18)(cid:18)(cid:18)(cid:19)(cid:19) (cid:19)(cid:19) ीीीीयययय (cid:22)(cid:22)(cid:22)(cid:22)(cid:23)(cid:23)ेे(cid:23)(cid:23)ेे (cid:1)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) के(cid:2) (cid:4)ीय (cid:2)(cid:1) च(cid:2) (cid:4)पुरा(cid:1)यूिनट-(cid:5).(cid:9)(cid:1) झारखंड डीवीसी (cid:10) थािपत कोयला (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:8)े(cid:9)(cid:1) पि(cid:15)म के(cid:2) (cid:4)ीय (cid:7)(cid:1) मेिजया(cid:1)यूिनट-(cid:10)(cid:1) डीवीसी (cid:10) थािपत कोयला (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) बंगाल (cid:8)े(cid:9) मेिजया पीएच(cid:1)//(cid:1)यूिनट(cid:1) पि(cid:15)म के(cid:2) (cid:4)ीय (cid:11)(cid:1) (cid:5).(cid:9)(cid:1) बंगाल डीवीसी (cid:8)े(cid:9) (cid:10) थािपत कोयला (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) के(cid:2) (cid:4)ीय (cid:6)(cid:1) कोडरमा(cid:1)यूिनट(cid:1)(cid:2)(cid:1) झारखंड डीवीसी (cid:10) थािपत कोयला (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:8)े(cid:9) के(cid:2) (cid:4)ीय (cid:3)(cid:1) कोडरमा यूिनट(cid:1)(cid:7)(cid:1)(cid:1) झारखंड डीवीसी िनमा(cid:18)णाधीन कोयला (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:1)(cid:1) (cid:8)े(cid:9) पि(cid:15)म के(cid:2) (cid:4)ीय (cid:10)(cid:1) दगु ा(cid:18)परु (cid:10) टील यूिनट (cid:2)(cid:1) डीवीसी (cid:10) थािपत कोयला (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) बंगाल (cid:8)े(cid:9) पि(cid:15)म के(cid:2) (cid:4)ीय (cid:5)(cid:1) दगु ा(cid:18)परु (cid:10) टील यूिनट (cid:7)(cid:1) डीवीसी (cid:10) थािपत कोयला (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) बंगाल (cid:8)े(cid:9) रघुनाथपरु (cid:1)पीएच-/(cid:1)यूिनट(cid:1) पि(cid:15)म के(cid:2) (cid:4)ीय (cid:9)(cid:1) (cid:2).(cid:7)(cid:1) बंगाल डीवीसी (cid:8)े(cid:9) िनमा(cid:18)णाधीन कोयला (cid:2)(cid:7)(cid:4)(cid:4)(cid:1) (cid:2)(cid:7)(cid:4)(cid:4)(cid:1) (cid:2)(cid:7)(cid:4)(cid:4)(cid:1) (cid:1)(cid:1) के(cid:2) (cid:4)ीय (cid:8)(cid:1) बोकारो िव(cid:10)त ार(cid:1) झारखंड डीवीसी (cid:8)े(cid:9) िनमा(cid:18)णाधीन कोयला (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) काम(cid:30)ग(cid:1)जल िव>ुत अ णाचल के(cid:2) (cid:4)ीय (cid:2)(cid:4)(cid:1) नीपको िनमा(cid:18)णाधीन हाइ&ो (cid:10)(cid:4)(cid:4)(cid:1) (cid:10)(cid:4)(cid:4)(cid:1) प(cid:26)रयोजना(cid:1) "देश (cid:8)े(cid:9) (cid:1)(cid:1) (cid:1)(cid:1) ’कारे( वर (cid:1)(cid:21)(cid:18)(cid:1)िव>ुत एनएचडी के(cid:2) (cid:4)ीय (cid:2)(cid:2)(cid:1) म)य "दशे (cid:10) थािपत हाइ&ो (cid:3)(cid:7)(cid:4)(cid:1) (cid:3)(cid:7)(cid:4)(cid:1) (cid:3)(cid:7)(cid:4)(cid:1) (cid:3)(cid:7)(cid:4)(cid:1) प(cid:26)रयोजना(cid:1) सी (cid:8)े(cid:9)66 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 77778888,,,,777700000000 66662222,,,,333377774444 (cid:22)(cid:22)(cid:22)(cid:22).... सससस...ंं.ंं (cid:28)(cid:28)(cid:28)(cid:28)लल लल ााााटटंंटटंं ककककाााा ननननाााामममम रररराााा(cid:24)(cid:24)(cid:24)(cid:24)यय यय एएएएजजजजसस(cid:31)(cid:31)सस(cid:31)(cid:31) ीीीी (cid:1)(cid:1)(cid:1)(cid:1)(cid:3)(cid:3)ेे(cid:3)(cid:3)ेे िििि!!!!थथथथिििितततत ####धधधधनननन ककककाााा (cid:1)(cid:1)(cid:1)(cid:1)ममममतततताााा ममममेगेगेगेगााााववववााााटटटट ममममेगेगेगेगााााववववााााटटटट !!!!थथ थथ ााााििििपपपपतततत %%%%ककककाााारररर ((((ममममेगेगेगेगााााववववााााटटटट)))) ककककेेेे अअअअननननससुुससुु ाााारररर ककककेेेे अअअअननननससुुससुु ाााारररर (cid:1)(cid:1)(cid:1)(cid:1)ममममतततताााा (cid:1)(cid:1)(cid:1)(cid:1)ममममतततताााा (cid:1)(cid:1)(cid:1)(cid:1)ममममतततताााा ती(cid:10) ता (cid:1)0(cid:1)यूिनट(cid:1)(cid:2).(cid:7).(cid:11)(cid:1) एनएचपी के(cid:2) (cid:4)ीय (cid:2)(cid:7)(cid:1) जल िव>ुत प(cid:26)रयोजना(cid:1) िस,-म सी (cid:8)े(cid:9) (cid:10) थािपत हाइ&ो (cid:3)(cid:2)(cid:4)(cid:1) (cid:3)(cid:2)(cid:4)(cid:1) (cid:3)(cid:2)(cid:4)(cid:1) (cid:3)(cid:2)(cid:4)(cid:1) सेवा-//(cid:1),1(cid:13)(cid:23)2(cid:2).(cid:11).(cid:7)(cid:1)(cid:21)(cid:18)(cid:1) ज/म ूऔर एनएचपी के(cid:2) (cid:4)ीय (cid:2)(cid:11)(cid:1) िव>ुत प(cid:26)रयोजना(cid:1) क(म ीर सी (cid:8)े(cid:9) (cid:10) थािपत हाइ&ो (cid:2)(cid:7)(cid:4)(cid:1) (cid:2)(cid:7)(cid:4)(cid:1) (cid:2)(cid:7)(cid:4)(cid:1) (cid:2)(cid:7)(cid:4)(cid:1) चमेरा-///(cid:1)जल िव>ुत िहमाचल एनएचपी के(cid:2) (cid:4)ीय (cid:2)(cid:6)(cid:1) प(cid:26)रयोजना(cid:1) "देश सी (cid:8)े(cid:9) िनमा(cid:18)णाधीन हाइ&ो (cid:7)(cid:11)(cid:2)(cid:1) (cid:7)(cid:11)(cid:2)(cid:1) (cid:7)(cid:11)(cid:2)(cid:1) (cid:1)(cid:1) पाब-ती(cid:1)-(cid:1)//(cid:1)जल िव>ुत िहमाचल एनएचपी के(cid:2) (cid:4)ीय (cid:2)(cid:3)(cid:1) प(cid:26)रयोजना(cid:1) "देश सी (cid:8)े(cid:9) िनमा(cid:18)णाधीन हाइ&ो (cid:9)(cid:4)(cid:4)(cid:1) (cid:9)(cid:4)(cid:4)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) पाब-ती(cid:1)-(cid:1)///(cid:1)जल िव>ुत िहमाचल एनएचपी के(cid:2) (cid:4)ीय (cid:2)(cid:10)(cid:1) प(cid:26)रयोजना(cid:1) "देश सी (cid:8)े(cid:9) िनमा(cid:18)णाधीन हाइ&ो (cid:3)(cid:7)(cid:4)(cid:1) (cid:3)(cid:7)(cid:4)(cid:1) (cid:3)(cid:7)(cid:4)(cid:1) (cid:1)(cid:1) ((cid:12)(cid:26)-//(cid:1)जल िव>ुत ज/म ूऔर एनएचपी के(cid:2) (cid:4)ीय (cid:2)(cid:5)(cid:1) प(cid:26)रयोजना(cid:1) क(म ीर सी (cid:8)े(cid:9) िनमा(cid:18)णाधीन हाइ&ो (cid:7)(cid:6)(cid:4)(cid:1) (cid:7)(cid:6)(cid:4)(cid:1) (cid:7)(cid:6)(cid:4)(cid:1) (cid:1)(cid:1) नीमू बाजगो(cid:1)जल िव>ुत ज/म ूऔर एनएचपी के(cid:2) (cid:4)ीय (cid:2)(cid:9)(cid:1) िनमा(cid:18)णाधीन हाइ&ो (cid:6)(cid:3)(cid:1) (cid:6)(cid:3)(cid:1) (cid:6)(cid:3)(cid:1) (cid:1)(cid:1) प(cid:26)रयोजना(cid:1) क(म ीर सी (cid:8)े(cid:9) छुटक (cid:1)जल िव>ुत ज/म ूऔर एनएचपी के(cid:2) (cid:4)ीय (cid:2)(cid:8)(cid:1) िनमा(cid:18)णाधीन हाइ&ो (cid:6)(cid:6)(cid:1) (cid:6)(cid:6)(cid:1) (cid:6)(cid:6)(cid:1) (cid:1)(cid:1) प(cid:26)रयोजना(cid:1) क(म ीर सी (cid:8)े(cid:9) ती(cid:10) ता लो डैम-///(cid:1)(cid:21)(cid:18)(cid:1) पि(cid:15)म एनएचपी के(cid:2) (cid:4)ीय (cid:7)(cid:4)(cid:1) िव>ुत प(cid:26)रयोजना(cid:1) बंगाल सी (cid:8)े(cid:9) िनमा(cid:18)णाधीन हाइ&ो (cid:2)(cid:11)(cid:7)(cid:1) (cid:2)(cid:11)(cid:7)(cid:1) (cid:2)(cid:11)(cid:7)(cid:1) (cid:1)(cid:1) ती(cid:10) ता लो डैम -/0(cid:1)(cid:21)(cid:18)(cid:1) पि(cid:15)म एनएचपी के(cid:2) (cid:4)ीय (cid:7)(cid:2)(cid:1) िव>ुत प(cid:26)रयोजना(cid:1) बंगाल सी (cid:8)े(cid:9) िनमा(cid:18)णाधीन हाइ&ो (cid:2)(cid:10)(cid:4)(cid:1) (cid:2)(cid:10)(cid:4)(cid:1) (cid:2)(cid:10)(cid:4)(cid:1) (cid:1)(cid:1) सुबं2ी लोअर(cid:1)जल िव>ुत अ णाचल एनएचपी के(cid:2) (cid:4)ीय (cid:7)(cid:7)(cid:1) िनमा(cid:18)णाधीन हाइ&ो (cid:7)(cid:4)(cid:4)(cid:4)(cid:1) (cid:7)(cid:4)(cid:4)(cid:4)(cid:1) प(cid:26)रयोजना(cid:1) "देश सी (cid:8)े(cid:9) (cid:1)(cid:1) (cid:1)(cid:1) बर3सगसर एलआईजी(cid:1) के(cid:2) (cid:4)ीय (cid:7)(cid:11)(cid:1) ,1(cid:13)(cid:23)2(cid:2).(cid:7)(cid:1) राज(cid:10)थ ान एनएलसी (cid:8)े(cid:9) (cid:10) थािपत िल7 नाइट (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) नेवेली-(cid:1)//(cid:1)$(cid:18)34(cid:21)(cid:26)(cid:1) के(cid:2) (cid:4)ीय (cid:7)(cid:6)(cid:1) तिमलनाडु एनएलसी (cid:8)े(cid:9) (cid:10) थािपत िल7 नाइट (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) ,1(cid:13)(cid:23)2(cid:2)(cid:1) नेवेली(cid:1)-(cid:1)//(cid:1)$(cid:18)34(cid:21)(cid:26)(cid:1) के(cid:2) (cid:4)ीय (cid:7)(cid:3)(cid:1) तिमलनाडु एनएलसी (cid:8)े(cid:9) िनमा(cid:18)णाधीन िल7 नाइट (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:1)(cid:1) ,1(cid:13)(cid:23)2(cid:7)(cid:1) के(cid:2) (cid:4)ीय (cid:7)(cid:10)(cid:1) तूतीकोरीन (cid:1)संयु8त उ:म(cid:1) तिमलनाडु एनएलसी (cid:8)े(cid:9) िनमा(cid:18)णाधीन कोयला (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) के(cid:2) (cid:4)ीय (cid:7)(cid:5)(cid:1) कैगा(cid:1),1(cid:13)(cid:23)2-(cid:11).(cid:6)(cid:1) कना(cid:18)टक एनपीसी (cid:10) थािपत (cid:2) यूि8लयर (cid:6)(cid:6)(cid:4)(cid:1) (cid:6)(cid:6)(cid:4)(cid:1) (cid:6)(cid:6)(cid:4)(cid:1) (cid:6)(cid:6)(cid:4)(cid:1) (cid:8)े(cid:9) के(cid:2) (cid:4)ीय (cid:7)(cid:9)(cid:1) आरएपीपी(cid:1),1(cid:13)(cid:23)2-(cid:3).(cid:10)(cid:1) राज(cid:10)थ ान एनपीसी (cid:10) थािपत (cid:2) यूि8लयर (cid:6)(cid:6)(cid:4)(cid:1) (cid:6)(cid:6)(cid:4)(cid:1) (cid:6)(cid:6)(cid:4)(cid:1) (cid:6)(cid:6)(cid:4)(cid:1) (cid:8)े(cid:9) के(cid:2) (cid:4)ीय (cid:7)(cid:8)(cid:1) कुडनकुलम ,1(cid:13)(cid:23)2(cid:1)(cid:2).(cid:7)(cid:1) तिमलनाडु एनपीसी िनमा(cid:18)णाधीन (cid:2) यूि8लयर (cid:7)(cid:4)(cid:4)(cid:4)(cid:1) (cid:7)(cid:4)(cid:4)(cid:4)(cid:1) (cid:7)(cid:4)(cid:4)(cid:4)(cid:1) (cid:1)(cid:1) (cid:8)े(cid:9) के(cid:2) (cid:4)ीय (cid:11)(cid:4)(cid:1) पीएफबीआर (कलप8क म) (cid:1) तिमलनाडु एनपीसी िनमा(cid:18)णाधीन (cid:2) यूि8लयर (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:1)(cid:1) (cid:8)े(cid:9) र; निग<र (दाभोल) संयु8त एनटीपी के(cid:2) (cid:4)ीय गैस/एलए (cid:11)(cid:2)(cid:1) महारा=> (cid:10) थािपत (cid:5)(cid:6)(cid:4)(cid:1) (cid:5)(cid:6)(cid:4)(cid:1) (cid:5)(cid:6)(cid:4)(cid:1) (cid:5)(cid:6)(cid:4)(cid:1) उ:म(cid:1) सी (cid:8)े(cid:9) नजी एनटीपी के(cid:2) (cid:4)ीय (cid:11)(cid:7)(cid:1) िसपत-//(cid:1),1(cid:13)(cid:23)2(cid:6).(cid:3)(cid:1) छ;त ीसगढ़ (cid:10) थािपत कोयला (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) सी (cid:8)े(cid:9) एनटीपी के(cid:2) (cid:4)ीय (cid:11)(cid:11)(cid:1) िसपत(cid:1)-/(cid:1),1(cid:13)(cid:23)2(cid:2).(cid:7)(cid:1) छ;त ीसगढ़ (cid:10) थािपत कोयला (cid:2)(cid:11)(cid:7)(cid:4)(cid:1) (cid:2)(cid:11)(cid:7)(cid:4)(cid:1) (cid:1)(cid:1) (cid:2)(cid:11)(cid:7)(cid:4)(cid:1) सी (cid:8)े(cid:9) एनटीपी के(cid:2) (cid:4)ीय (cid:11)(cid:6)(cid:1) िसपत(cid:1)/(cid:1),1(cid:13)(cid:23)2(cid:11)(cid:1) छ;त ीसगढ़ सी (cid:8)े(cid:9) िनमा(cid:18)णाधीन कोयला (cid:10)(cid:10)(cid:4)(cid:1) (cid:10)(cid:10)(cid:4)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) िभलाई संयु8त उ:म(cid:1) एनटीपी के(cid:2) (cid:4)ीय (cid:11)(cid:3)(cid:1) ,1(cid:13)(cid:23)2(cid:1)(cid:2).(cid:7)(cid:1) छ;त ीसगढ़ सी (cid:8)े(cid:9) (cid:10) थािपत कोयला (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) एनटीपी के(cid:2) (cid:4)ीय (cid:11)(cid:10)(cid:1) कोरबा(cid:1)///(cid:1),1(cid:13)(cid:23)2-(cid:5)(cid:1) छ;त ीसगढ़ (cid:10) थािपत कोयला (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) सी (cid:8)े(cid:9) एनटीपी के(cid:2) (cid:4)ीय (cid:11)(cid:5)(cid:1) कहलगावं (cid:1)//(cid:1),1(cid:13)(cid:23)2(cid:1)(cid:10).(cid:5)(cid:1) िबहार (cid:10) थािपत कोयला (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) सी (cid:8)े(cid:9)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 67 77778888,,,,777700000000 66662222,,,,333377774444 (cid:22)(cid:22)(cid:22)(cid:22).... सससस...ंं.ंं (cid:28)(cid:28)(cid:28)(cid:28)लल लल ााााटटंंटटंं ककककाााा ननननाााामममम रररराााा(cid:24)(cid:24)(cid:24)(cid:24)यय यय एएएएजजजजसस(cid:31)(cid:31)सस(cid:31)(cid:31) ीीीी (cid:1)(cid:1)(cid:1)(cid:1)(cid:3)(cid:3)ेे(cid:3)(cid:3)ेे िििि!!!!थथथथिििितततत ####धधधधनननन ककककाााा (cid:1)(cid:1)(cid:1)(cid:1)ममममतततताााा ममममेगेगेगेगााााववववााााटटटट ममममेगेगेगेगााााववववााााटटटट !!!!थथ थथ ााााििििपपपपतततत %%%%ककककाााारररर ((((ममममेगेगेगेगााााववववााााटटटट)))) ककककेेेे अअअअननननससुुससुु ाााारररर ककककेेेे अअअअननननससुुससुु ाााारररर (cid:1)(cid:1)(cid:1)(cid:1)ममममतततताााा (cid:1)(cid:1)(cid:1)(cid:1)ममममतततताााा (cid:1)(cid:1)(cid:1)(cid:1)ममममतततताााा दादरी िव(cid:10) तार(cid:1),1(cid:13)(cid:23)2- उ;त र एनटीपी के(cid:2) (cid:4)ीय (cid:11)(cid:9)(cid:1) (cid:3).(cid:10)(cid:1) "देश सी (cid:8)े(cid:9) (cid:10) थािपत कोयला (cid:8)(cid:9)(cid:4)(cid:1) (cid:8)(cid:9)(cid:4)(cid:1) (cid:8)(cid:9)(cid:4)(cid:1) (cid:8)(cid:9)(cid:4)(cid:1) इं,दरागाधं ी टीपीपी(cid:1) के(cid:2) (cid:4)ीय (cid:11)(cid:8)(cid:1) 5झB जर6(cid:1)संयु8त उ:म ह<रयाणा एनटीपी (cid:8)े(cid:9) (cid:10) थािपत कोयला (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) सी ,1(cid:13)(cid:23)2(cid:2).(cid:7)(cid:1) इं,दरागाधं ी टीपीपी(cid:1) के(cid:2) (cid:4)ीय (cid:6)(cid:4)(cid:1) 5झB जर6(cid:1)संय8ु त उ:म(cid:1) ह<रयाणा एनटीपी (cid:8)े(cid:9) िनमा(cid:18)णाधीन कोयला (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:1)(cid:1) सी ,1(cid:13)(cid:23)2(cid:11)(cid:1) पि(cid:15)म एनटीपी के(cid:2) (cid:4)ीय (cid:6)(cid:2)(cid:1) फर8क ा -///(cid:1),1(cid:13)(cid:23)2-(cid:10)(cid:1) (cid:10) थािपत कोयला (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) बंगाल सी (cid:8)े(cid:9) िस/ हा(cid:4)ी िव(cid:10)त ार(cid:1),1(cid:13)(cid:23)2- आ(cid:2)D एनटीपी के(cid:2) (cid:4)ीय (cid:6)(cid:7)(cid:1) (cid:11).(cid:6)(cid:1) "देश सी (cid:8)े(cid:9) (cid:10) थािपत कोयला (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) बEगईगांव(cid:1)2(cid:26)(cid:19)(cid:26)(cid:19)(cid:26)(cid:1),1(cid:13)(cid:23)2(cid:1) एनटीपी के(cid:2) (cid:4)ीय (cid:6)(cid:11)(cid:1) (cid:2)-(cid:11)(cid:1) असम सी (cid:8)े(cid:9) िनमा(cid:18)णाधीन कोयला (cid:5)(cid:3)(cid:4)(cid:1) (cid:5)(cid:3)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:1)(cid:1) लोहरी नागपाला(cid:1)(cid:21)(cid:18)(cid:1) एनटीपी के(cid:2) (cid:4)ीय (cid:6)(cid:6)(cid:1) उ;त राखंड िनमा(cid:18)णाधीन हाइ&ो (cid:10)(cid:4)(cid:4)(cid:1) (cid:10)(cid:4)(cid:4)(cid:1) िव>ुत प(cid:26)रयोजना(cid:1) सी (cid:8)े(cid:9) (cid:1)(cid:1) (cid:1)(cid:1) तपोवन(cid:1)(cid:1)िव=ण गु ढ़ (cid:21)(cid:18)(cid:1) एनटीपी के(cid:2) (cid:4)ीय (cid:6)(cid:3)(cid:1) उ;त राखंड िनमा(cid:18)णाधीन हाइ&ो (cid:3)(cid:7)(cid:4)(cid:1) (cid:3)(cid:7)(cid:4)(cid:1) िव>ुत प(cid:26)रयोजना(cid:1) सी (cid:8)े(cid:9) (cid:1)(cid:1) (cid:1)(cid:1) कोलदाम(cid:1)जल िव>ुत िहमाचल एनटीपी के(cid:2) (cid:4)ीय (cid:6)(cid:10)(cid:1) िनमा(cid:18)णाधीन हाइ&ो (cid:9)(cid:4)(cid:4)(cid:1) (cid:9)(cid:4)(cid:4)(cid:1) प(cid:26)रयोजना(cid:1) "देश सी (cid:8)े(cid:9) (cid:1)(cid:1) (cid:1)(cid:1) एनटीपी के(cid:2) (cid:4)ीय (cid:6)(cid:5)(cid:1) मौदा(cid:1)2(cid:26)(cid:19)(cid:26)(cid:19)(cid:26)(cid:1),1(cid:13)(cid:23)2(cid:2).(cid:7)(cid:1) महारा=> िनमा(cid:18)णाधीन कोयला (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) सी (cid:8)े(cid:9) एनटीपी के(cid:2) (cid:4)ीय (cid:6)(cid:9)(cid:1) बाड़-।(cid:1),1(cid:13)(cid:23)2(cid:1)(cid:2).(cid:7).(cid:11)(cid:1) िबहार सी (cid:8)े(cid:9) िनमा(cid:18)णाधीन कोयला (cid:2)(cid:8)(cid:9)(cid:4)(cid:1) (cid:2)(cid:8)(cid:9)(cid:4)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) एनटीपी के(cid:2) (cid:4)ीय (cid:6)(cid:8)(cid:1) बाड़(cid:1)//(cid:1),1(cid:13)(cid:23)2(cid:2)(cid:1) िबहार सी (cid:8)े(cid:9) िनमा(cid:18)णाधीन कोयला (cid:10)(cid:10)(cid:4)(cid:1) (cid:10)(cid:10)(cid:4)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) नबीनगढ़ संयु8त उ:म(cid:1)ू एनटीपी के(cid:2) (cid:4)ीय (cid:3)(cid:4)(cid:1) ,1(cid:13)(cid:23)2-(cid:2).(cid:7).(cid:11)(cid:1) िबहार सी (cid:8)े(cid:9) िनमा(cid:18)णाधीन कोयला (cid:5)(cid:3)(cid:4)(cid:1) (cid:5)(cid:3)(cid:4)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) वेGल रू (cid:1)5ए(cid:2) नोर6(cid:1)संयु?त (cid:1) एनटीपी के(cid:2) (cid:4)ीय (cid:3)(cid:2)(cid:1) उ>म (cid:1),1(cid:13)(cid:23)2(cid:1)(cid:2)(cid:1) तिमलनाडु सी (cid:8)े(cid:9) (cid:10) थािपत कोयला (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) वेGल रू (cid:1)5ए(cid:2) नोर6(cid:1)संयु?त (cid:1) एनटीपी के(cid:2) (cid:4)ीय (cid:3)(cid:7)(cid:1) उ>म (cid:1),1(cid:13)(cid:23)2(cid:1)(cid:7)(cid:1) तिमलनाडु सी (cid:8)े(cid:9) िनमा(cid:18)णाधीन कोयला (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:1)(cid:1) ि(cid:9)पुरा गैस आईएलएफएस(cid:1) ओएनजी के(cid:2) (cid:4)ीय गैस/एलए (cid:3)(cid:11)(cid:1) संयु?त उ>म (cid:1) ि(cid:9)पुरा सी (cid:8)े(cid:9) िनमा(cid:18)णाधीन नजी(cid:1) (cid:5)(cid:7)(cid:10)(cid:1) (cid:5)(cid:3)(cid:4)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) रामपुर(cid:1)जल िव>ुत िहमाचल एसजेवीए के(cid:2) (cid:4)ीय (cid:3)(cid:6)(cid:1) िनमा(cid:18)णाधीन हाइ&ो (cid:6)(cid:2)(cid:7)(cid:1) (cid:6)(cid:2)(cid:7)(cid:1) प(cid:26)रयोजना(cid:1) "देश नएल (cid:8)े(cid:9) (cid:1)(cid:1) (cid:1)(cid:1) टीएचडी के(cid:2) (cid:4)ीय (cid:3)(cid:3)(cid:1) कोटे(व र ,1(cid:13)(cid:23)2(cid:1)(cid:2)-(cid:6)(cid:1) उ;त राखंड (cid:10) थािपत हाइ&ो (cid:6)(cid:4)(cid:4)(cid:1) (cid:6)(cid:4)(cid:4)(cid:1) (cid:6)(cid:4)(cid:4)(cid:1) (cid:6)(cid:4)(cid:4)(cid:1) सी (cid:8)े(cid:9) (cid:1)(cid:1) उउउउपपपप जजजजोोोोड़ड़ड़ड़ ((((ककककेेेे(cid:18)(cid:18)(cid:18)(cid:18)(cid:19)(cid:19) (cid:19)(cid:19) ीीीीयययय (cid:22)(cid:22)(cid:22)(cid:22)(cid:23)(cid:23)ेे(cid:23)(cid:23)ेे )))) (cid:1)(cid:1) 33335555888822224444 22221111222222222222 11115555222222220000 (cid:1)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) रररराााा(cid:24)(cid:24)(cid:24)(cid:24)यय यय (cid:22)(cid:22)(cid:22)(cid:22)(cid:23)(cid:23)ेे(cid:23)(cid:23)ेे (cid:1)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) आ(cid:2)D एपी (cid:2)(cid:1) जुराला ि"या(cid:1)(cid:1),1(cid:13)(cid:23)2(cid:1)(cid:2)-(cid:10)(cid:1) राB य (cid:8)े(cid:9)(cid:1) (cid:10) थािपत हाइ&ो (cid:7)(cid:11)(cid:6)(cid:1) (cid:7)(cid:11)(cid:6)(cid:1) (cid:7)(cid:11)(cid:6)(cid:1) (cid:7)(cid:11)(cid:6)(cid:1) "देश जेनको (cid:7)(cid:1) रायलसीमा(cid:1),1(cid:13)(cid:23)2(cid:6).(cid:3)(cid:1) आ(cid:2)D एपी राB य (cid:8)े(cid:9) (cid:10) थािपत कोयला (cid:6)(cid:7)(cid:4)(cid:1) (cid:6)(cid:7)(cid:4)(cid:1) (cid:6)(cid:7)(cid:4)(cid:1) (cid:6)(cid:7)(cid:4)(cid:1) "देश जेनको िवजयवाड़ा 2(cid:26)(cid:19)(cid:26)(cid:19)(cid:26)(cid:1) आ(cid:2)D एपी राB य (cid:8)े(cid:9) (cid:11)(cid:1) (cid:10) थािपत कोयला (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) एसटी-/0.(cid:1),1(cid:13)(cid:23)2(cid:2)(cid:1) "देश जेनको (cid:6)(cid:1) काकितया(cid:1)2(cid:26)(cid:19)(cid:26)(cid:19)(cid:26)(cid:1) आ(cid:2)D एपी राB य (cid:8)े(cid:9) (cid:10) थािपत कोयला (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) "देश जेनको68 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 77778888,,,,777700000000 66662222,,,,333377774444 (cid:22)(cid:22)(cid:22)(cid:22).... सससस...ंं.ंं (cid:28)(cid:28)(cid:28)(cid:28)लल लल ााााटटंंटटंं ककककाााा ननननाााामममम रररराााा(cid:24)(cid:24)(cid:24)(cid:24)यय यय एएएएजजजजसस(cid:31)(cid:31)सस(cid:31)(cid:31) ीीीी (cid:1)(cid:1)(cid:1)(cid:1)(cid:3)(cid:3)ेे(cid:3)(cid:3)ेे िििि!!!!थथथथिििितततत ####धधधधनननन ककककाााा (cid:1)(cid:1)(cid:1)(cid:1)ममममतततताााा ममममेगेगेगेगााााववववााााटटटट ममममेगेगेगेगााााववववााााटटटट !!!!थथ थथ ााााििििपपपपतततत %%%%ककककाााारररर ((((ममममेगेगेगेगााााववववााााटटटट)))) ककककेेेे अअअअननननससुुससुु ाााारररर ककककेेेे अअअअननननससुुससुु ाााारररर (cid:1)(cid:1)(cid:1)(cid:1)ममममतततताााा (cid:1)(cid:1)(cid:1)(cid:1)ममममतततताााा (cid:1)(cid:1)(cid:1)(cid:1)ममममतततताााा (cid:3)(cid:1) कोथागुडेम एसटी-0/(cid:1) आ(cid:2)D एपी राB य (cid:8)े(cid:9) (cid:10) थािपत कोयला (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) "देश जेनको (cid:10)(cid:1) नागाजु(cid:18)न सागर टीआर (cid:1) आ(cid:2)D एपी राB य (cid:8)(cid:9)े िनमा(cid:18)णाधीन हाइ&ो (cid:3)(cid:4)(cid:1) (cid:3)(cid:4)(cid:1) (cid:3)(cid:4)(cid:1) (cid:1)(cid:1) "देश जेनको लोवर जरु ाला(cid:1),1(cid:13)(cid:23)2(cid:1)(cid:2)-(cid:10)(cid:1) आ(cid:2)D एपी राB य (cid:8)े(cid:9) (cid:5)(cid:1) िनमा(cid:18)णाधीन हाइ&ो (cid:7)(cid:6)(cid:4)(cid:1) (cid:7)(cid:6)(cid:4)(cid:1) जल िव>ुत प(cid:26)रयोजना(cid:1) "देश जेनको (cid:1)(cid:1) (cid:1)(cid:1) पुली3छतला जल िव>ुत आ(cid:2)D एपी राB य (cid:8)े(cid:9) (cid:9)(cid:1) िनमा(cid:18)णाधीन हाइ&ो (cid:2)(cid:7)(cid:4)(cid:1) (cid:2)(cid:7)(cid:4)(cid:1) प(cid:26)रयोजना(cid:1) "देश आईडी (cid:1)(cid:1) (cid:1)(cid:1) काकितया िव(cid:10)त ार (cid:1) आ(cid:2)D एपी राB य (cid:8)े(cid:9) (cid:8)(cid:1) िनमा(cid:18)णाधीन कोयला (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) ,1(cid:13)(cid:23)2(cid:2)(cid:1) "देश जेनको (cid:1)(cid:1) (cid:1)(cid:1) एपीजीसी राB य (cid:8)े(cid:9) गैस/एलए (cid:2)(cid:4)(cid:1) लकवा उI G यएू च (cid:1) असम (cid:10) थािपत (cid:11)(cid:5)7(cid:7)(cid:1) (cid:11)(cid:5)7(cid:7)(cid:1) (cid:11)(cid:5)7(cid:7)(cid:1) (cid:11)(cid:5)7(cid:7)(cid:1) एल नजी कोरबा पूव (cid:18)िव(cid:10)त ार (cid:1) राB य (cid:8)े(cid:9) (cid:2)(cid:2)(cid:1) छ;त ीसगढ़ सीएसईबी (cid:10) थािपत कोयला (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) ,1(cid:13)(cid:23)2(cid:7)(cid:1) मरवाह (cid:1)2(cid:26)(cid:19)(cid:26)(cid:19)(cid:26)(cid:1),1(cid:13)(cid:23)2(cid:1) राB य (cid:8)े(cid:9) (cid:2)(cid:7)(cid:1) छ;त ीसगढ़ सीएसईबी िनमा(cid:18)णाधीन कोयला (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2).(cid:7)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) कोरबा पि(cid:15)म िव(cid:10)त ार राB य (cid:8)े(cid:9) (cid:2)(cid:11)(cid:1) छ;त ीसगढ़ सीएसईबी िनमा(cid:18)णाधीन कोयला (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) पीएच(cid:1)///(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) "गित-///(cid:1)5बवाना6(cid:1)जीटी- पीपीसीए राB य (cid:8)े(cid:9) गैस/एलए (cid:2)(cid:6)(cid:1) ,दGल ी (cid:10) थािपत (cid:5)(cid:3)(cid:4)(cid:1) (cid:5)(cid:3)(cid:4)(cid:1) (cid:5)(cid:3)(cid:4)(cid:1) (cid:5)(cid:3)(cid:4)(cid:1) (cid:2).(cid:7)(cid:1)एसटी-(cid:2)(cid:1) ल नजी "गित-///(cid:1)5बवाना6(cid:1)जीटी(cid:1) पीपीसीए राB य (cid:8)े(cid:9) गैस/एलए (cid:2)(cid:3)(cid:1) ,दGल ी िनमा(cid:18)णाधीन (cid:5)(cid:3)(cid:4)(cid:1) (cid:5)(cid:3)(cid:4)(cid:1) (cid:5)(cid:3)(cid:4)(cid:1) (cid:1)(cid:1) -(cid:11).(cid:6)(cid:1)8(cid:1)एसटी-(cid:7)(cid:1) ल नजी (cid:2)(cid:10)(cid:1) कु; च (cid:1)िल@न ा92(cid:1)टीपीएस(cid:1) गुजरात जीएसई राB य (cid:8)े(cid:9) (cid:10) थािपत िल7 नाइट (cid:5)(cid:3)(cid:1) (cid:5)(cid:3)(cid:1) (cid:5)(cid:3)(cid:1) (cid:5)(cid:3)(cid:1) सीएल जीएसई राB य (cid:8)े(cid:9) गैस/एलए (cid:2)(cid:5)(cid:1) धुव(cid:18)न एसटी(cid:1) गुजरात (cid:10) थािपत (cid:6)(cid:4)(cid:1) (cid:6)(cid:4)(cid:1) (cid:6)(cid:4)(cid:1) (cid:6)(cid:4)(cid:1) सीएल नजी ((cid:31)(cid:12)(cid:23)(cid:1)(cid:29)(cid:26)(cid:29)(cid:26)(cid:19)(cid:26)(cid:19)(cid:26)- जीएसई राB य (cid:8)े(cid:9) गैस/एलए (cid:2)(cid:9)(cid:1) गुजरात (cid:10) थािपत (cid:11)(cid:5)(cid:6)(cid:1) (cid:11)(cid:5)(cid:6)(cid:1) (cid:11)(cid:5)(cid:6)(cid:1) (cid:11)(cid:5)(cid:6)(cid:1) जीटी:एसटी(cid:1) सीएल नजी सूरत िल7 नाइट िव(cid:10)त ार (cid:1) जीआईपी राB य (cid:8)े(cid:9) (cid:2)(cid:8)(cid:1) गुजरात (cid:10) थािपत िल7 नाइट (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) ,1(cid:13)(cid:23)2(cid:11).(cid:6)(cid:1) सीएल(cid:1) (cid:7)(cid:4)(cid:1) उकाई िव(cid:21)त ा(cid:12)(cid:1),1(cid:13)(cid:23)2(cid:10)(cid:1) गुजरात जीएसई राB य (cid:8)े(cid:9) िनमा(cid:18)णाधीन कोयला (cid:6)(cid:8)(cid:4)(cid:1) (cid:6)(cid:8)(cid:4)(cid:1) (cid:6)(cid:8)(cid:4)(cid:1) (cid:1)(cid:1) सीएल जीएसई राB य (cid:8)े(cid:9) गैस/एलए (cid:7)(cid:2)(cid:1) जीएसइ(cid:18)जी हजीरा िव(cid:10)त ार (cid:1) गुजरात (cid:10) थािपत (cid:11)(cid:3)(cid:2)(cid:1) (cid:11)(cid:3)(cid:2)(cid:1) (cid:11)(cid:3)(cid:2)(cid:1) (cid:11)(cid:3)(cid:2)(cid:1) सीएल नजी पीआईपीएबीएवी(cid:1)(cid:29)(cid:20)यु?त (cid:1) जीएसई राB य (cid:8)े(cid:9) गैस/एलए (cid:7)(cid:7)(cid:1) गुजरात िनमा(cid:18)णाधीन (cid:5)(cid:4)(cid:7)(cid:1) (cid:5)(cid:4)(cid:7)(cid:1) (cid:5)(cid:4)(cid:7)(cid:1) (cid:1)(cid:1) उ>म (cid:1)सीसीजीटी (cid:1) सीएल नजी (cid:7)(cid:11)(cid:1) िस8 का टीपीपी िव(cid:10)त ार (cid:1) गुजरात ज सी ीए एस लई राB य (cid:8)े(cid:9) िनमा(cid:18)णाधीन कोयला (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) (cid:7)(cid:6)(cid:1) यमुना नगर ,(cid:13)1(cid:23)2(cid:2).(cid:7)(cid:1) ह<रयाणा एचपीजी राB य (cid:8)े(cid:9) (cid:10) थािपत कोयला (cid:10)(cid:4)(cid:4)(cid:1) (cid:10)(cid:4)(cid:4)(cid:1) (cid:10)(cid:4)(cid:4)(cid:1) (cid:10)(cid:4)(cid:4)(cid:1) सीएल राजीव गांधी टीपीएस (cid:1) एचपीजी राB य (cid:8)े(cid:9) (cid:7)(cid:3)(cid:1) ह<रयाणा (cid:10) थािपत कोयला (cid:2)(cid:7)(cid:4)(cid:4)(cid:1) (cid:2)(cid:7)(cid:4)(cid:4)(cid:1) (cid:2)(cid:7)(cid:4)(cid:4)(cid:1) (cid:2)(cid:7)(cid:4)(cid:4)(cid:1) 5िहसार6(cid:1),1(cid:13)(cid:23)2(cid:2).(cid:7)(cid:1) सीएल ,1$(cid:17)$(cid:18)(cid:1)-(cid:1)///(cid:1)(cid:21)(cid:18)(cid:1) िहमाचल एचपीजे राB य (cid:8)े(cid:9) (cid:7)(cid:10)(cid:1) वीवीएनए िनमा(cid:18)णाधीन हाइ&ो (cid:2)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:1) िव>ुत प(cid:26)रयोजना(cid:1) "देश ल (cid:1)(cid:1) (cid:1)(cid:1) सवारा कुडु (cid:21)ल िव>ुत िहमाचल राB य (cid:8)े(cid:9) (cid:7)(cid:5)(cid:1) पीवीसी िनमा(cid:18)णाधीन हाइ&ो (cid:2)(cid:2)(cid:4)(cid:1) (cid:2)(cid:2)(cid:4)(cid:1) प(cid:26)रयोजना(cid:1) "देश (cid:1)(cid:1) (cid:1)(cid:1) बगिलहार-/(cid:1),1(cid:13)(cid:23)2(cid:2).(cid:7).(cid:11)(cid:1) ज/म ूऔर जेकेपीडी राB य (cid:8)े(cid:9) (cid:7)(cid:9)(cid:1) (cid:10) थािपत हाइ&ो (cid:6)(cid:3)(cid:4)(cid:1) (cid:6)(cid:3)(cid:4)(cid:1) (cid:6)(cid:3)(cid:4)(cid:1) (cid:6)(cid:3)(cid:4)(cid:1) जल िव>ुत प(cid:26)रयोजना(cid:1) क(म ीर सी वराही िव(cid:10) तार (cid:1) राB य (cid:8)े(cid:9) केपीसीए (cid:7)(cid:8)(cid:1) ,1(cid:13)(cid:23)2(cid:2).(cid:7)(cid:1)जल िव>ुत कना(cid:18)टक (cid:10) थािपत हाइ&ो (cid:7)(cid:11)(cid:4)(cid:1) (cid:7)(cid:11)(cid:4)(cid:1) (cid:7)(cid:11)(cid:4)(cid:1) (cid:7)(cid:11)(cid:4)(cid:1) ल प(cid:26)रयोजना(cid:1)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 69 77778888,,,,777700000000 66662222,,,,333377774444 (cid:22)(cid:22)(cid:22)(cid:22).... सससस...ंं.ंं (cid:28)(cid:28)(cid:28)(cid:28)लल लल ााााटटंंटटंं ककककाााा ननननाााामममम रररराााा(cid:24)(cid:24)(cid:24)(cid:24)यय यय एएएएजजजजसस(cid:31)(cid:31)सस(cid:31)(cid:31) ीीीी (cid:1)(cid:1)(cid:1)(cid:1)(cid:3)(cid:3)ेे(cid:3)(cid:3)ेे िििि!!!!थथथथिििितततत ####धधधधनननन ककककाााा (cid:1)(cid:1)(cid:1)(cid:1)ममममतततताााा ममममेगेगेगेगााााववववााााटटटट ममममेगेगेगेगााााववववााााटटटट !!!!थथ थथ ााााििििपपपपतततत %%%%ककककाााारररर ((((ममममेगेगेगेगााााववववााााटटटट)))) ककककेेेे अअअअननननससुुससुु ाााारररर ककककेेेे अअअअननननससुुससुु ाााारररर (cid:1)(cid:1)(cid:1)(cid:1)ममममतततताााा (cid:1)(cid:1)(cid:1)(cid:1)ममममतततताााा (cid:1)(cid:1)(cid:1)(cid:1)ममममतततताााा बेGल ारी(cid:1)2(cid:26)(cid:19)(cid:26)(cid:19)(cid:26)(cid:1),1(cid:13)(cid:23)2(cid:1) केपीसीए राB य (cid:8)े(cid:9) (cid:11)(cid:4)(cid:1) (cid:2).(cid:7)(cid:1) कना(cid:18)टक ल (cid:10) थािपत कोयला (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:11)(cid:2)(cid:1) रायचूर(cid:1),1(cid:13)(cid:23)2(cid:1)(cid:9)(cid:1) कना(cid:18)टक केपीसीए राB य (cid:8)े(cid:9) (cid:10) थािपत कोयला (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) ल कु<टयाड़ी िव(cid:10)त ार(cid:1) राB य (cid:8)े(cid:9) (cid:11)(cid:7)(cid:1) ,1(cid:13)(cid:23)2(cid:2).(cid:7)(cid:1)जल िव>ुत केरल(cid:1) केएसईबी (cid:10) थािपत हाइ&ो (cid:2)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:1) प(cid:26)रयोजना(cid:1) पGल ीवसल(cid:1)जल िव>ुत राB य (cid:8)े(cid:9) (cid:11)(cid:11)(cid:1) केरल केएसईबी िनमा(cid:18)णाधीन हाइ&ो (cid:10)(cid:4)(cid:1) (cid:10)(cid:4)(cid:1) प(cid:26)रयोजना(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) घाटघर पीएसएस(cid:1) जीओएम राB य (cid:8)े(cid:9) (cid:11)(cid:6)(cid:1) महारा=> (cid:10) थािपत हाइ&ो (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) ,1(cid:13)(cid:23)2(cid:2).(cid:7)(cid:1) आईडी (cid:11)(cid:3)(cid:1) पारस िव(cid:10) तार ,1(cid:13)(cid:23)2(cid:2).(cid:7)(cid:1) महारा=> एमएसपी राB य (cid:8)े(cid:9) (cid:10) थािपत कोयला (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) जीसीएल (cid:11)(cid:10)(cid:1) (cid:2) यू पलK िव(cid:10)त ार (cid:1),1(cid:13)(cid:23)2-(cid:7)(cid:1) महारा=> एमएसपी राB य (cid:8)े(cid:9) (cid:10) थािपत कोयला (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) जीसीएल (cid:11)(cid:5)(cid:1) खपेर खेड़ा िव(cid:10)त ार (cid:1) महारा=> एमएसपी राB य (cid:8)े(cid:9) (cid:10) थािपत कोयला (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) जीसीएल भुसावल (cid:1)2(cid:26)(cid:19)(cid:26)(cid:19)(cid:26)(cid:1) एमएसपी राB य (cid:8)े(cid:9) (cid:11)(cid:9)(cid:1) महारा=> (cid:10) थािपत कोयला (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) ,1(cid:13)(cid:23)2(cid:6).(cid:3)(cid:1) जीसीएल 3मतडू चरण-/(cid:1)जल िव>ुत एमईएसई राB य (cid:8)े(cid:9) (cid:11)(cid:8)(cid:1) मेघालय (cid:10) थािपत हाइ&ो (cid:9)(cid:6)(cid:1) (cid:9)(cid:6)(cid:1) (cid:9)(cid:6)(cid:1) (cid:9)(cid:6)(cid:1) प(cid:26)रयोजना(cid:1) बी 3मतडू चरण-/(cid:1)अित<र8त एमईएसई राB य (cid:8)े(cid:9) (cid:6)(cid:4)(cid:1) मेघालय िनमा(cid:18)णाधीन हाइ&ो (cid:6)(cid:7)(cid:1) (cid:1)(cid:1) (cid:6)(cid:7)(cid:1) (cid:1)(cid:1) ,1(cid:13)(cid:23)2(cid:1) बी (cid:2) यू अमत (cid:1)जल िव>ुत एमईएसई राB य (cid:8)े(cid:9) (cid:6)(cid:2)(cid:1) मेघालय िनमा(cid:18)णाधीन हाइ&ो (cid:6)(cid:4)(cid:1) (cid:6)(cid:4)(cid:1) प(cid:26)रयोजना(cid:1) बी (cid:1)(cid:1) (cid:1)(cid:1) (cid:6)(cid:7)(cid:1) िबर3सहपरु िव(cid:10)त ार (cid:1) म)य "दशे एमपीजी राB य (cid:8)े(cid:9) (cid:10) थािपत कोयला (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) सीएल (cid:6)(cid:11)(cid:1) अमरकंटक(cid:1),1(cid:13)(cid:23)2-(cid:3)(cid:1) म)य "दशे एमपी राB य (cid:8)े(cid:9) (cid:10) थािपत कोयला (cid:7)(cid:2)(cid:4)(cid:1) (cid:7)(cid:2)(cid:4)(cid:1) (cid:7)(cid:2)(cid:4)(cid:1) (cid:7)(cid:2)(cid:4)(cid:1) जेनको मालवा(cid:1)2(cid:26)(cid:19)(cid:26)(cid:19)(cid:26)(cid:1) एमपी राB य (cid:8)े(cid:9) (cid:6)(cid:6)(cid:1) म)य "दशे िनमा(cid:18)णाधीन कोयला (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) ,1(cid:13)(cid:23)2(cid:2).(cid:7)(cid:1) जेनको (cid:1)(cid:1) (cid:1)(cid:1) सतपुड़ा िव(cid:10)त ार(cid:1),1(cid:13)(cid:23)2- एमपीपी राB य (cid:8)े(cid:9) (cid:6)(cid:3)(cid:1) म)य "दशे िनमा(cid:18)णाधीन कोयला (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:2).(cid:7)(cid:1) जीसीएल (cid:1)(cid:1) (cid:1)(cid:1) बालीमेल(cid:1)जल िव>ुत राB य (cid:8)े(cid:9) ORISS ओएचपी (cid:6)(cid:10)(cid:1) प(cid:26)रयोजना(cid:1)$(cid:29)2(cid:26)-//(cid:1) (cid:10) थािपत हाइ&ो (cid:2)(cid:3)(cid:4)(cid:1) (cid:2)(cid:3)(cid:4)(cid:1) (cid:2)(cid:3)(cid:4)(cid:1) (cid:2)(cid:3)(cid:4)(cid:1) A सी ,1(cid:13)(cid:23)2(cid:5).(cid:9)(cid:1) जीएचटीपीपी-//(cid:1),1(cid:13)(cid:23)2- PयूिनटN राB य (cid:8)(cid:9)े (cid:6)(cid:5)(cid:1) पीएसईबी (cid:10) थािपत कोयला (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:11).(cid:6)(cid:1) JAB िगराल(cid:1)िल@न ा92(cid:1),1(cid:13)(cid:23)2- आरआरवी राB य (cid:8)े(cid:9) (cid:6)(cid:9)(cid:1) राज(cid:10)थ ान (cid:10) थािपत िल7 नाइट (cid:2)(cid:7)(cid:3)(cid:1) (cid:2)(cid:7)(cid:3)(cid:1) (cid:2)(cid:7)(cid:3)(cid:1) (cid:2)(cid:7)(cid:3)(cid:1) (cid:7)(cid:1) यूएनएल छाबड़ा टीपीएस(cid:1),1(cid:13)(cid:23)2- आरआरवी राB य (cid:8)े(cid:9) (cid:6)(cid:8)(cid:1) राज(cid:10)थ ान (cid:10) थािपत कोयला (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:2).(cid:7)(cid:1) यूएनएल (cid:3)(cid:4)(cid:1) कोटा(cid:1)2(cid:26)(cid:19)(cid:26)(cid:19)(cid:26)(cid:1),1(cid:13)(cid:23)2(cid:5)(cid:1) राज(cid:10)थ ान आरआरवी राB य (cid:8)े(cid:9) (cid:10) थािपत कोयला (cid:2)(cid:8)(cid:3)(cid:1) (cid:2)(cid:8)(cid:3)(cid:1) (cid:2)(cid:8)(cid:3)(cid:1) (cid:2)(cid:8)(cid:3)(cid:1) यूएनएल (cid:3)(cid:2)(cid:1) सूरतगढ़ िव(cid:10)त ार(cid:1),1(cid:13)(cid:23)2(cid:10)(cid:1) राज(cid:10)थ ान आरआरवी राB य (cid:8)े(cid:9) (cid:10) थािपत कोयला (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) यूएनएल आरआरवी राB य (cid:8)े(cid:9) गैस/एलए (cid:3)(cid:7)(cid:1) धौलपरु जीटी(cid:1)(cid:7):एसटी(cid:1) राज(cid:10)थ ान (cid:10) थािपत (cid:7)(cid:7)(cid:4)(cid:1) (cid:7)(cid:7)(cid:4)(cid:1) (cid:7)(cid:7)(cid:4)(cid:1) (cid:7)(cid:7)(cid:4)(cid:1) यूएनएल नजी काली3सध टीपीएस(cid:1) आरआरवी राB य (cid:8)े(cid:9) (cid:3)(cid:11)(cid:1) राज(cid:10)थ ान िनमा(cid:18)णाधीन कोयला (cid:10)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) ,1(cid:13)(cid:23)2(cid:2)(cid:1) यूएनएल (cid:1)(cid:1) (cid:1)(cid:1)70 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 77778888,,,,777700000000 66662222,,,,333377774444 (cid:22)(cid:22)(cid:22)(cid:22).... सससस...ंं.ंं (cid:28)(cid:28)(cid:28)(cid:28)लल लल ााााटटंंटटंं ककककाााा ननननाााामममम रररराााा(cid:24)(cid:24)(cid:24)(cid:24)यय यय एएएएजजजजसस(cid:31)(cid:31)सस(cid:31)(cid:31) ीीीी (cid:1)(cid:1)(cid:1)(cid:1)(cid:3)(cid:3)ेे(cid:3)(cid:3)ेे िििि!!!!थथथथिििितततत ####धधधधनननन ककककाााा (cid:1)(cid:1)(cid:1)(cid:1)ममममतततताााा ममममेगेगेगेगााााववववााााटटटट ममममेगेगेगेगााााववववााााटटटट !!!!थथ थथ ााााििििपपपपतततत %%%%ककककाााारररर ((((ममममेगेगेगेगााााववववााााटटटट)))) ककककेेेे अअअअननननससुुससुु ाााारररर ककककेेेे अअअअननननससुुससुु ाााारररर (cid:1)(cid:1)(cid:1)(cid:1)ममममतततताााा (cid:1)(cid:1)(cid:1)(cid:1)ममममतततताााा (cid:1)(cid:1)(cid:1)(cid:1)ममममतततताााा राB य (cid:8)े(cid:9) गैस/एलए (cid:3)(cid:6)(cid:1) वल; थरू िव(cid:10)त ार (cid:1) तिमलनाडु टीएनईबी (cid:10) थािपत (cid:8)(cid:7)7(cid:7)(cid:1) (cid:8)(cid:7)7(cid:7)(cid:1) (cid:8)(cid:7)7(cid:7)(cid:1) (cid:8)(cid:7)7(cid:7)(cid:1) नजी (cid:3)(cid:3)(cid:1) भवानी िव(cid:10) तार (cid:1)//(cid:1)8(cid:1)///(cid:1) तिमलनाडु टीएनईबी राB य (cid:8)(cid:9)े िनमा(cid:18)णाधीन हाइ&ो (cid:10)(cid:4)(cid:1) (cid:10)(cid:4)(cid:1) (cid:10)(cid:4)(cid:1) (cid:1)(cid:1) (cid:3)(cid:10)(cid:1) मे; तूर िव(cid:10) तार (cid:1),1(cid:13)(cid:23)2(cid:2)(cid:1) तिमलनाडु टीएनईबी राB य (cid:8)े(cid:9) िनमा(cid:18)णाधीन कोयला (cid:10)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:10)(cid:4)(cid:4)(cid:1) (cid:1)(cid:1) उ; तर चे(cid:2) नई िव(cid:10)त ार राB य (cid:8)े(cid:9) (cid:3)(cid:5)(cid:1) तिमलनाडु टीएनईबी िनमा(cid:18)णाधीन कोयला (cid:2)(cid:7)(cid:4)(cid:4)(cid:1) (cid:10)(cid:4)(cid:4)(cid:1) (cid:2)(cid:7)(cid:4)(cid:4)(cid:1) (cid:1)(cid:1) ,1(cid:13)(cid:23)2(cid:2).(cid:7)(cid:1) राB य (cid:8)े(cid:9) गैस/एलए (cid:3)(cid:9)(cid:1) बारामूड़ा जीटी (cid:1) ि(cid:9)पुरा (cid:1) (cid:10) थािपत (cid:7)(cid:2)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) (cid:7)(cid:2)(cid:1) नजी मनेरी भाली जल िव>ुत यूजेवीएन राB य (cid:8)े(cid:9) (cid:3)(cid:8)(cid:1) उ;त राखंड (cid:10) थािपत हाइ&ो (cid:11)(cid:4)(cid:6)(cid:1) (cid:11)(cid:4)(cid:6)(cid:1) (cid:11)(cid:4)(cid:6)(cid:1) (cid:11)(cid:4)(cid:6)(cid:1) प(cid:26)रयोजना(cid:1) एल पारीछा िव(cid:10)त ार ,1(cid:13)(cid:23)2- उ;त र यूपीआर राB य (cid:8)े(cid:9) (cid:10)(cid:4)(cid:1) वीयूएनए िनमा(cid:18)णाधीन कोयला (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:3)(cid:4)(cid:4)(cid:1) (cid:1)(cid:1) (cid:3).(cid:10)(cid:1) "देश ल हरदआु गंज िव(cid:10)त ार उ;त र यूपीआर राB य (cid:8)े(cid:9) (cid:10)(cid:2)(cid:1) वीयूएनए (cid:10) थािपत कोयला (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) ,1(cid:13)(cid:23)2-(cid:9)(cid:1) "देश ल हरदआु गंज िव(cid:10)त ार (cid:1) उ;त र यूपीआर राB य (cid:8)े(cid:9) (cid:10)(cid:7)(cid:1) वीयूएनए िनमा(cid:18)णाधीन कोयला (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:1)(cid:1) ,1(cid:13)(cid:23)2-(cid:8)(cid:1) "देश ल उ;त र यूपीआर राB य (cid:8)े(cid:9) (cid:10)(cid:11)(cid:1) अनपरा –डी (cid:1),1(cid:13)(cid:23)2(cid:2).(cid:7)(cid:1) वीयूएनए िनमा(cid:18)णाधीन कोयला (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) "दशे ल (cid:1)(cid:1) (cid:1)(cid:1) (cid:10)(cid:6)(cid:1) पु िलया पीएसएस (cid:1) पि(cid:15)म डIG य बू ीए राB य (cid:8)े(cid:9) (cid:10) थािपत हाइ&ो (cid:8)(cid:4)(cid:4)(cid:1) (cid:8)(cid:4)(cid:4)(cid:1) (cid:8)(cid:4)(cid:4)(cid:1) (cid:8)(cid:4)(cid:4)(cid:1) बंगाल सईबी पि(cid:15)म डIG य बू ी राB य (cid:8)े(cid:9) (cid:10)(cid:3)(cid:1) सगर,दघी ,1(cid:13)(cid:23)2(cid:1)(cid:2).(cid:7)(cid:1) पीडीसीए (cid:10) थािपत कोयला (cid:10)(cid:4)(cid:4)(cid:1) (cid:10)(cid:4)(cid:4)(cid:1) (cid:10)(cid:4)(cid:4)(cid:1) (cid:10)(cid:4)(cid:4)(cid:1) बंगाल ल पि(cid:15)म डIG य बू ी राB य (cid:8)े(cid:9) (cid:10)(cid:10)(cid:1) संतलडीह (cid:1),1(cid:13)(cid:23)2(cid:3)(cid:1) पीडीसीए (cid:10) थािपत कोयला (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) बंगाल ल संतलडीह िव(cid:10)त ार -,1(cid:13)(cid:23)2(cid:1) पि(cid:15)म डIG य बू ी राB य (cid:8)े(cid:9) (cid:10)(cid:5)(cid:1) पीडीसीए (cid:10) थािपत कोयला (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:10)(cid:1) बंगाल ल पि(cid:15)म डIG य बू ी राB य (cid:8)े(cid:9) (cid:10)(cid:9)(cid:1) बकरे(व र (cid:1),1(cid:13)(cid:23)2(cid:1)(cid:6).(cid:3)(cid:1) पीडीसीए (cid:10) थािपत कोयला (cid:6)(cid:7)(cid:4)(cid:1) (cid:6)(cid:7)(cid:4)(cid:1) (cid:6)(cid:7)(cid:4)(cid:1) (cid:6)(cid:7)(cid:4)(cid:1) बंगाल ल (cid:10)(cid:8)(cid:1) दगु ा(cid:18)परु िव(cid:10) तार ,1(cid:13)(cid:23)2(cid:1)(cid:5)(cid:1) पि(cid:15)म डीपीएल राB य (cid:8)े(cid:9) (cid:10) थािपत कोयला (cid:11)(cid:4)(cid:4)(cid:1) (cid:11)(cid:4)(cid:4)(cid:1) (cid:11)(cid:4)(cid:4)(cid:1) (cid:11)(cid:4)(cid:4)(cid:1) बंगाल (cid:1)(cid:1) उउउउपपपप जजजजोोोोड़ड़ड़ड़ ((((रररराााा(cid:24)(cid:24)(cid:24)(cid:24)यय यय (cid:22)(cid:22)(cid:22)(cid:22)(cid:23)(cid:23)ेे(cid:23)(cid:23)ेे )))) (cid:1)(cid:1) 22226666777788883333 22221111333355555555 11116666777733332222 (cid:1)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) ििििननननजजजजीीीी (cid:22)(cid:22)(cid:22)(cid:22)(cid:23)(cid:23)ेे(cid:23)(cid:23)ेे (cid:1)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) आ(cid:2)D कोनासी गैस/एलए (cid:2)(cid:1) कोनासीमा(cid:1)जीटी:एसटी(cid:1) िनजी (cid:8)े(cid:9)(cid:1) (cid:10) थािपत (cid:6)(cid:6)(cid:3)(cid:1) (cid:6)(cid:6)(cid:3)(cid:1) (cid:6)(cid:6)(cid:3)(cid:1) (cid:6)(cid:6)(cid:3)(cid:1) "देश मा पावर नजी आ(cid:2)D गौतमी िनजी (cid:8)े(cid:9) गैस/एलए (cid:7)(cid:1) गौतमी(cid:1) (cid:10) थािपत (cid:6)(cid:10)(cid:6)(cid:1) (cid:6)(cid:10)(cid:6)(cid:1) (cid:6)(cid:10)(cid:6)(cid:1) (cid:6)(cid:10)(cid:6)(cid:1) "देश पावर नजी कEडापGल ी सीसीपीपी आ(cid:2)D िनजी (cid:8)े(cid:9) गैस/एलए (cid:11)(cid:1) लNको (cid:10) थािपत (cid:11)(cid:10)(cid:10)(cid:1) (cid:1)(cid:1) (cid:11)(cid:10)(cid:10)(cid:1) (cid:11)(cid:10)(cid:10)(cid:1) पीएच-//(cid:1)(cid:21)(cid:26)2(cid:26):$(cid:29)2(cid:26)(cid:1) "देश नजी रायगढ़ 2(cid:26)(cid:19)(cid:26)(cid:19)(cid:26)(cid:1)(cid:19)(cid:26)$(cid:17)-/.(cid:1) िनजी (cid:8)े(cid:9) 3जदल (cid:6)(cid:1) ,1(cid:13)(cid:23)2-(cid:2).(cid:1)(cid:7);(cid:1)(cid:1)(cid:19)(cid:26)$(cid:17)(cid:1)//(cid:1) छ;त ीसगढ़ (cid:10) थािपत कोयला (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) पावर ,1(cid:13)(cid:23)2(cid:1)(cid:11).(cid:6)(cid:1) ल6को(cid:1)अमरकंटक(cid:1) िनजी (cid:8)े(cid:9) (cid:3)(cid:1) छ;त ीसगढ़ ल6को (cid:10) थािपत कोयला (cid:10)(cid:4)(cid:4)(cid:1) (cid:10)(cid:4)(cid:4)(cid:1) (cid:10)(cid:4)(cid:4)(cid:1) (cid:10)(cid:4)(cid:4)(cid:1) ,1(cid:13)(cid:23)2(cid:2).(cid:7)(cid:1)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 71 77778888,,,,777700000000 66662222,,,,333377774444 (cid:22)(cid:22)(cid:22)(cid:22).... सससस...ंं.ंं (cid:28)(cid:28)(cid:28)(cid:28)लल लल ााााटटंंटटंं ककककाााा ननननाााामममम रररराााा(cid:24)(cid:24)(cid:24)(cid:24)यय यय एएएएजजजजसस(cid:31)(cid:31)सस(cid:31)(cid:31) ीीीी (cid:1)(cid:1)(cid:1)(cid:1)(cid:3)(cid:3)ेे(cid:3)(cid:3)ेे िििि!!!!थथथथिििितततत ####धधधधनननन ककककाााा (cid:1)(cid:1)(cid:1)(cid:1)ममममतततताााा ममममेगेगेगेगााााववववााााटटटट ममममेगेगेगेगााााववववााााटटटट !!!!थथ थथ ााााििििपपपपतततत %%%%ककककाााारररर ((((ममममेगेगेगेगााााववववााााटटटट)))) ककककेेेे अअअअननननससुुससुु ाााारररर ककककेेेे अअअअननननससुुससुु ाााारररर (cid:1)(cid:1)(cid:1)(cid:1)ममममतततताााा (cid:1)(cid:1)(cid:1)(cid:1)ममममतततताााा (cid:1)(cid:1)(cid:1)(cid:1)ममममतततताााा <रठाला सीसीपीपी(cid:1) िनजी (cid:8)े(cid:9) (cid:10)(cid:1) 5(cid:21)(cid:26)2(cid:26)(cid:2):(cid:21)(cid:26)2(cid:26)(cid:7):$(cid:29)2(cid:26) ,दGल ी एनडीपीए (cid:10) थािपत गैस/एलए (cid:2)(cid:4)(cid:9)7(cid:4)(cid:1) (cid:1)(cid:1) (cid:2)(cid:4)(cid:9)7(cid:4)(cid:1) (cid:2)(cid:4)(cid:9)7(cid:4)(cid:1) ल नजी 6(cid:1) सुजेन टोर(cid:30)ट Iल ॉक (cid:1)/.(cid:1)//(cid:1)8(cid:1) िनजी (cid:8)े(cid:9) गैस/एलए (cid:2)(cid:2)(cid:6)(cid:5)7 (cid:5)(cid:1) गुजरात टोर(cid:30)ट (cid:10) थािपत (cid:2)(cid:2)(cid:6)(cid:5)7(cid:3)(cid:1) (cid:2)(cid:2)(cid:7)(cid:9)(cid:1) (cid:2)(cid:2)(cid:6)(cid:5)7(cid:3)(cid:1) ///(cid:1) नजी (cid:3)(cid:1) मु(cid:5)ा(cid:1)2(cid:26)(cid:19)(cid:26)(cid:19)(cid:26)(cid:1)(cid:19)(cid:26)$(cid:17)-/.(cid:1) अदानी िनजी (cid:8)े(cid:9) (cid:9)(cid:1) गुजरात (cid:10) थािपत कोयला (cid:2)(cid:11)(cid:7)(cid:4)(cid:1) (cid:2)(cid:11)(cid:7)(cid:4)(cid:1) (cid:2)(cid:11)(cid:7)(cid:4)(cid:1) (cid:2)(cid:11)(cid:7)(cid:4)(cid:1) ,1(cid:13)(cid:23)2(cid:1)(cid:2)-(cid:6)(cid:1) पावर मु(cid:5)ा(cid:1)2(cid:26)(cid:19)(cid:26)(cid:19)(cid:26)(cid:1)(cid:19)(cid:26)$(cid:17)-//(cid:1) अदानी िनजी (cid:8)े(cid:9) (cid:8)(cid:1) गुजरात (cid:10) थािपत कोयला (cid:2)(cid:11)(cid:7)(cid:4)(cid:1) (cid:1)(cid:1) (cid:2)(cid:11)(cid:7)(cid:4)(cid:1) (cid:2)(cid:11)(cid:7)(cid:4)(cid:1) ,1(cid:13)(cid:23)2(cid:2).(cid:7)(cid:1) पावर मु(cid:5)ा(cid:1)2(cid:26)(cid:19)(cid:26)(cid:19)(cid:26)(cid:1)(cid:19)(cid:26)$(cid:17)-///(cid:1) अदानी िनजी (cid:8)े(cid:9) (cid:2)(cid:4)(cid:1) गुजरात (cid:10) थािपत कोयला (cid:10)(cid:10)(cid:4)(cid:1) (cid:1)(cid:1) (cid:10)(cid:10)(cid:4)(cid:1) (cid:10)(cid:10)(cid:4)(cid:1) ,1(cid:13)(cid:23)2-(cid:2)(cid:1) पावर मु(cid:5)ा(cid:1)2(cid:26)(cid:19)(cid:26)(cid:19)(cid:26)(cid:1)(cid:19)(cid:26)$(cid:17)-///(cid:1) अदानी िनजी (cid:8)े(cid:9) (cid:2)(cid:2)(cid:1) गुजरात (cid:10) थािपत कोयला (cid:2)(cid:11)(cid:7)(cid:4)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) (cid:2)(cid:11)(cid:7)(cid:4)(cid:1) ,1(cid:13)(cid:23)2-(cid:7).(cid:11)(cid:1) पावर अ(cid:24)( ा(cid:1)(cid:15)%(cid:27)(cid:16)(cid:1)(cid:1)मु(cid:5)ा(cid:1) टाटा िनजी (cid:8)े(cid:9) (cid:2)(cid:7)(cid:1) गुजरात (cid:10) थािपत कोयला (cid:9)(cid:4)(cid:4)(cid:1) (cid:1)(cid:1) (cid:9)(cid:4)(cid:4)(cid:1) (cid:9)(cid:4)(cid:4)(cid:1) ,1(cid:13)(cid:23)2(cid:2)(cid:1) पावर अG लाइन दहु ांगन(cid:1) िहमाचल एडीएचपी िनजी (cid:8)े(cid:9) (cid:2)(cid:11)(cid:1) (cid:10) थािपत हाइ&ो (cid:2)(cid:8)(cid:7)(cid:1) (cid:2)(cid:8)(cid:7)(cid:1) (cid:2)(cid:8)(cid:7)(cid:1) (cid:2)(cid:8)(cid:7)(cid:1) ,1(cid:13)(cid:23)2(cid:2).(cid:7)(cid:1) "देश आईएल (cid:2)(cid:6)(cid:1) करचम वां7 त ू,1(cid:13)(cid:23)2(cid:2)-(cid:6)(cid:1) िहमाचल जेपीकेसी िनजी (cid:8)े(cid:9) (cid:10) थािपत हाइ&ो (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) "देश एल मलाना जल िव>ुत िहमाचल एवरे(cid:10)ट िनजी (cid:8)े(cid:9) (cid:2)(cid:3)(cid:1) (cid:10) थािपत हाइ&ो (cid:2)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:1) प(cid:26)रयोजना(cid:1)//(cid:1),1(cid:13)(cid:23)2(cid:2).(cid:7)(cid:1) "देश पावर बुिधल (cid:1)जल िव>ुत िहमाचल िनजी (cid:8)े(cid:9) (cid:2)(cid:10)(cid:1) लांको िनमा(cid:18)णाधीन हाइ&ो (cid:5)(cid:4)(cid:1) (cid:5)(cid:4)(cid:1) (cid:5)(cid:4)(cid:1) (cid:1)(cid:1) प(cid:26)रयोजना(cid:1) "देश सोरंग जल िव>ुत िहमाचल िहमाचल िनजी (cid:8)े(cid:9) (cid:2)(cid:5)(cid:1) सोरंग िनमा(cid:18)णाधीन हाइ&ो (cid:2)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:1) प(cid:26)रयोजना(cid:1) "देश (cid:1)(cid:1) (cid:1)(cid:1) पावर मैथन आरबीसी (cid:1)संयु?त (cid:1) िनजी (cid:8)े(cid:9) (cid:2)(cid:9)(cid:1) झारखंड आईपीपी (cid:10) थािपत कोयला (cid:2)(cid:4)(cid:3)(cid:4)(cid:1) (cid:2)(cid:4)(cid:3)(cid:4)(cid:1) (cid:2)(cid:4)(cid:3)(cid:4)(cid:1) (cid:2)(cid:4)(cid:3)(cid:4)(cid:1) उ>म (cid:1),1(cid:13)(cid:23)2(cid:2).(cid:7)<(cid:1) जेएसड िनजी (cid:8)े(cid:9) (cid:2)(cid:8)(cid:1) तोरंगGल ू(cid:1),1(cid:13)(cid:23)2(cid:2).(cid:7)(cid:1) कना(cid:18)टक IG य ू (cid:10) थािपत कोयला (cid:10)(cid:4)(cid:4)(cid:1) (cid:10)(cid:4)(cid:4)(cid:1) (cid:10)(cid:4)(cid:4)(cid:1) (cid:10)(cid:4)(cid:4)(cid:1) एनजK उडुBप ी(cid:1)2(cid:26)(cid:19)(cid:26)(cid:19)(cid:26)(cid:1)5ल6को(cid:1) िनजी (cid:8)े(cid:9) (cid:7)(cid:4)(cid:1) कना(cid:18)टक एनपीसीL (cid:10) थािपत कोयला (cid:2)(cid:7)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:2)(cid:3)(cid:1) (cid:2)(cid:4)(cid:2)(cid:3)(cid:1) (cid:2)(cid:7)(cid:4)(cid:4)(cid:1) नागाजु(cid:18)न(cid:1),1(cid:13)(cid:23)2(cid:2).(cid:7)(cid:1) (cid:7)(cid:2)(cid:1) >ो/ ब ेटीपीएस(cid:1) महारा=> टाटा िनजी (cid:8)े(cid:9) (cid:10) थािपत कोयला (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) पावर जेएसडI G यू एनजK(cid:1) जेएसड िनजी (cid:8)े(cid:9) (cid:7)(cid:7)(cid:1) महारा=> (cid:10) थािपत कोयला (cid:2)(cid:7)(cid:4)(cid:4)(cid:1) (cid:2)(cid:7)(cid:4)(cid:4)(cid:1) (cid:2)(cid:7)(cid:4)(cid:4)(cid:1) (cid:2)(cid:7)(cid:4)(cid:4)(cid:1) र; निग<र (cid:1),1(cid:13)(cid:23)2(cid:2)-(cid:6)(cid:1) IG य ू बरोरा टीपीएस(cid:1) वधा(cid:18) िनजी (cid:8)े(cid:9) (cid:7)(cid:11)(cid:1) महारा=> पावर (cid:10) थािपत कोयला (cid:3)(cid:6)(cid:4)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) (cid:3)(cid:6)(cid:4)(cid:1) ,1(cid:13)(cid:23)2(cid:2).(cid:7).(cid:11).(cid:6)(cid:1) कंपनी ितरोदा 2(cid:26)(cid:19)(cid:26)(cid:19)(cid:26)(cid:1)(cid:19)(cid:26)$(cid:17)-/(cid:1) अदानी िनजी (cid:8)े(cid:9) (cid:7)(cid:6)(cid:1) महारा=> िनमा(cid:18)णाधीन कोयला (cid:10)(cid:10)(cid:4)(cid:1) (cid:1)(cid:1) (cid:10)(cid:10)(cid:4)(cid:1) (cid:1)(cid:1) ,1(cid:13)(cid:23)2(cid:2)(cid:1) पावर एसएमए िनजी (cid:8)े(cid:9) (cid:7)(cid:3)(cid:1) महे( वर (cid:2)-(cid:2)(cid:4)(cid:1) म)य "दशे चपीसीए िनमा(cid:18)णाधीन हाइ&ो (cid:6)(cid:4)(cid:4)(cid:1) (cid:6)(cid:4)(cid:4)(cid:1) (cid:6)(cid:4)(cid:4)(cid:1) (cid:1)(cid:1) ल(cid:1) (cid:21)ट ला-इट (cid:1)2(cid:26)(cid:19)(cid:26)(cid:19)(cid:26)(cid:1),1(cid:13)(cid:23)2(cid:1) (cid:21)ट ला-इट िनजी (cid:8)े(cid:9) (cid:7)(cid:10)(cid:1) उड़ीसा (cid:10) थािपत कोयला (cid:2)(cid:7)(cid:4)(cid:4)(cid:1) (cid:10)(cid:4)(cid:4)(cid:1) (cid:2)(cid:7)(cid:4)(cid:4)(cid:1) (cid:2)(cid:7)(cid:4)(cid:4)(cid:1) (cid:7).(cid:2)(cid:1) एनजE (cid:21)ट ला-इट(cid:1)2(cid:26)(cid:19)(cid:26)(cid:19)(cid:26)(cid:1) (cid:10)ट ला(cid:18)इट िनजी (cid:8)े(cid:9) (cid:7)(cid:5)(cid:1) उड़ीसा (cid:10) थािपत कोयला (cid:10)(cid:4)(cid:4)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) (cid:10)(cid:4)(cid:4)(cid:1) ,1(cid:13)(cid:23)2(cid:11)(cid:1) एनजK72 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 77778888,,,,777700000000 66662222,,,,333377774444 (cid:22)(cid:22)(cid:22)(cid:22).... सससस...ंं.ंं (cid:28)(cid:28)(cid:28)(cid:28)लल लल ााााटटंंटटंं ककककाााा ननननाााामममम रररराााा(cid:24)(cid:24)(cid:24)(cid:24)यय यय एएएएजजजजसस(cid:31)(cid:31)सस(cid:31)(cid:31) ीीीी (cid:1)(cid:1)(cid:1)(cid:1)(cid:3)(cid:3)ेे(cid:3)(cid:3)ेे िििि!!!!थथथथिििितततत ####धधधधनननन ककककाााा (cid:1)(cid:1)(cid:1)(cid:1)ममममतततताााा ममममेगेगेगेगााााववववााााटटटट ममममेगेगेगेगााााववववााााटटटट !!!!थथ थथ ााााििििपपपपतततत %%%%ककककाााारररर ((((ममममेगेगेगेगााााववववााााटटटट)))) ककककेेेे अअअअननननससुुससुु ाााारररर ककककेेेे अअअअननननससुुससुु ाााारररर (cid:1)(cid:1)(cid:1)(cid:1)ममममतततताााा (cid:1)(cid:1)(cid:1)(cid:1)ममममतततताााा (cid:1)(cid:1)(cid:1)(cid:1)ममममतततताााा जिलQ पा (cid:1)िल@न ा92(cid:1) राज वे(cid:10)ट िनजी (cid:8)े(cid:9) (cid:7)(cid:9)(cid:1) राज(cid:10)थ ान (cid:10) थािपत िल7 नाइट (cid:3)(cid:6)(cid:4)(cid:1) (cid:3)(cid:6)(cid:4)(cid:1) (cid:3)(cid:6)(cid:4)(cid:1) (cid:3)(cid:6)(cid:4)(cid:1) ,1(cid:13)(cid:23)2(cid:1)(cid:2)-(cid:6)(cid:1) पावर जिलQ पा (cid:1)िल@न ा92(cid:1) राज वे(cid:10)ट िनजी (cid:8)े(cid:9) (cid:7)(cid:8)(cid:1) राज(cid:10)थ ान िनमा(cid:18)णाधीन िल7 नाइट (cid:3)(cid:6)(cid:4)(cid:1) (cid:3)(cid:6)(cid:4)(cid:1) (cid:3)(cid:6)(cid:4)(cid:1) (cid:1)(cid:1) ,1(cid:13)(cid:23)2(cid:1)(cid:3)-(cid:9)(cid:1) पावर (cid:11)(cid:4)(cid:1) ती(cid:10) ता (cid:1)///(cid:1) िस,-म ती(cid:10)त ा िनजी (cid:8)े(cid:9) िनमा(cid:18)णाधीन हाइ&ो (cid:2)(cid:7)(cid:4)(cid:4)(cid:1) (cid:2)(cid:7)(cid:4)(cid:4)(cid:1) (cid:10)(cid:4)(cid:4)(cid:1) (cid:1)(cid:1) ऊजा(cid:18) (cid:1) (cid:11)(cid:2)(cid:1) छुजाचेन(cid:1) िस,-म जेएटीआई िनजी (cid:8)े(cid:9) िनमा(cid:18)णाधीन हाइ&ो (cid:8)(cid:8)(cid:1) (cid:8)(cid:8)(cid:1) (cid:8)(cid:8)(cid:1) (cid:1)(cid:1) (cid:11)(cid:7)(cid:1) 2ीनगर (cid:1) उ;त राखंड जीवीके िनजी (cid:8)े(cid:9) िनमा(cid:18)णाधीन हाइ&ो (cid:11)(cid:11)(cid:4)(cid:1) (cid:11)(cid:11)(cid:4)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) मह; मा गांधी (झBज र) िनजी (cid:8)े(cid:9) (cid:11)(cid:11)(cid:1) ह<रयाणा सीएलपी (cid:10) थािपत कोयला (cid:10)(cid:10)(cid:4)(cid:1) (cid:1)(cid:1) 2(cid:26)(cid:19)(cid:26)(cid:19)(cid:26)(cid:1),1(cid:13)(cid:23)2(cid:2)(cid:1) (cid:1)(cid:1) (cid:10)(cid:10)(cid:4)(cid:1) (cid:11)(cid:6)(cid:1) कसाइपG ली (cid:1)2(cid:26)(cid:19)(cid:26)(cid:19)(cid:26)(cid:1) सीएचजी एसीबी िनजी (cid:8)े(cid:9) (cid:10) थािपत कोयला (cid:2)(cid:11)(cid:3)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) (cid:2)(cid:11)(cid:3)(cid:1) इंिडया (cid:11)(cid:3)(cid:1) एसवी पावर (cid:1)2(cid:26)(cid:19)(cid:26)(cid:19)(cid:26)(cid:1) सीएचजी ए पस ावव री िनजी (cid:8)े(cid:9) (cid:10) थािपत कोयला (cid:10)(cid:11)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) (cid:10)(cid:11)(cid:1) (cid:11)(cid:10)(cid:1) िमहान(cid:1)2(cid:26)(cid:19)(cid:26)(cid:19)(cid:26)(cid:1) एमएएच अ एिभ नज जी Kत िनजी (cid:8)े(cid:9) (cid:10) थािपत कोयला (cid:7)(cid:6)(cid:10)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) (cid:7)(cid:6)(cid:10)(cid:1) (cid:11)(cid:5)(cid:1) कटघोड़ा 2(cid:26)(cid:19)(cid:26)(cid:19)(cid:26)(cid:1),1(cid:13)(cid:23)2(cid:2)(cid:1) सीएचजी ए इंिस डी यब ाी िनजी (cid:8)े(cid:9) (cid:10) थािपत कोयला (cid:11)(cid:3)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) (cid:11)(cid:3)(cid:1) िस/ हापुरी एनजK "ाइवटे आ(cid:2)D मधुकन िनजी (cid:8)े(cid:9) (cid:11)(cid:9)(cid:1) प<रयोज (cid:10) थािपत कोयला (cid:2)(cid:3)(cid:4)(cid:1) (cid:1)(cid:1) िलिमटेड ,1(cid:13)(cid:23)2(cid:2)(cid:1) "देश नाएं (cid:1)(cid:1) (cid:2)(cid:3)(cid:4)(cid:1) (cid:11)(cid:8)(cid:1) सलाया(cid:1)2(cid:26)(cid:19)(cid:26)(cid:19)(cid:26)(cid:1),1(cid:13)(cid:23)2(cid:1)(cid:2)(cid:1) जीयूजे ए प(cid:10) ास वा रर िनजी (cid:8)े(cid:9) (cid:10) थािपत कोयला (cid:10)(cid:4)(cid:4)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) (cid:10)(cid:4)(cid:4)(cid:1) (cid:6)(cid:4)(cid:1) रोसा $(cid:29)2(cid:26)-/(cid:1),1(cid:13)(cid:23)2(cid:2).(cid:7)(cid:1) उ;त र <रलायंस िनजी (cid:8)े(cid:9) (cid:10) थािपत कोयला (cid:10)(cid:4)(cid:4)(cid:1) (cid:10)(cid:4)(cid:4)(cid:1) (cid:10)(cid:4)(cid:4)(cid:1) (cid:10)(cid:4)(cid:4)(cid:1) "देश पावर रोसा (cid:1)$(cid:29)2(cid:26)-//(cid:1) उ;त र <रलायंस िनजी (cid:8)े(cid:9) (cid:6)(cid:2)(cid:1) (cid:10) थािपत कोयला (cid:10)(cid:4)(cid:4)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) (cid:10)(cid:4)(cid:4)(cid:1) ,1(cid:13)(cid:23)2(cid:2).(cid:7)(cid:1) "देश पावर (cid:6)(cid:7)(cid:1) अनपरा-सी(cid:1),1(cid:13)(cid:23)2(cid:2).(cid:7)(cid:1) उ;त र लNको िनजी (cid:8)े(cid:9) (cid:10) थािपत कोयला (cid:2)(cid:7)(cid:4)(cid:4)(cid:1) (cid:2)(cid:4)(cid:4)(cid:4)(cid:1) (cid:2)(cid:7)(cid:4)(cid:4)(cid:1) (cid:2)(cid:7)(cid:4)(cid:4)(cid:1) "देश (cid:6)(cid:11)(cid:1) ख/ बरखेड़ा ,(cid:13)1(cid:23)2(cid:1)(cid:2).(cid:7)(cid:1) उ;त र बजाज िनजी (cid:8)े(cid:9) (cid:10) थािपत कोयला (cid:8)(cid:4)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) (cid:8)(cid:4)(cid:1) "देश एनजK (cid:6)(cid:6)(cid:1) मकसूदपरु ,1(cid:13)(cid:23)2(cid:1)(cid:2).(cid:7)(cid:1) उ;त र बजाज िनजी (cid:8)े(cid:9) (cid:10) थािपत कोयला (cid:8)(cid:4)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) (cid:8)(cid:4)(cid:1) "देश एनजK बरखेड़ा 2(cid:26)(cid:19)(cid:26)(cid:19)(cid:26)(cid:1),1(cid:13)(cid:23)2(cid:1) उ;त र बजाज िनजी (cid:8)(cid:9)े (cid:6)(cid:3)(cid:1) (cid:10) थािपत कोयला (cid:8)(cid:4)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) (cid:8)(cid:4)(cid:1) (cid:2).(cid:7)(cid:1) "देश एनजK कुंडाकT(cid:1)2(cid:26)(cid:19)(cid:26)(cid:19)(cid:26)(cid:1) उ;त र बजाज िनजी (cid:8)े(cid:9) (cid:6)(cid:10)(cid:1) (cid:10) थािपत कोयला (cid:8)(cid:4)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) (cid:8)(cid:4)(cid:1) ,1(cid:13)(cid:23)2(cid:2).(cid:7)(cid:1) "देश एनजK ((cid:31)(cid:12)(cid:16)(cid:18)(cid:16)(cid:1)(cid:1)2(cid:26)(cid:19)(cid:26)(cid:19)(cid:26)(cid:1) उ;त र बजाज िनजी (cid:8)े(cid:9) (cid:6)(cid:5)(cid:1) (cid:10) थािपत कोयला (cid:8)(cid:4)(cid:1) (cid:1)(cid:1) (cid:1)(cid:1) (cid:8)(cid:4)(cid:1) ,1(cid:13)(cid:23)2(cid:2).(cid:7)(cid:1) "देश एनजK (cid:6)(cid:9)(cid:1) बज-बज-िव(cid:10)त ार (cid:1) पि(cid:15)म सीईएस िनजी (cid:8)े(cid:9) (cid:10) थािपत कोयला (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) (cid:7)(cid:3)(cid:4)(cid:1) बंगाल सी (cid:1)(cid:1) उउउउपपपप जजजजोोोोड़ड़ड़ड़ ((((ििििननननजजजजीीीी (cid:22)(cid:22)(cid:22)(cid:22)(cid:23)(cid:23)ेे(cid:23)(cid:23)ेे )))) 11116666000099993333 11119999777799997777 22223333000011112222 (cid:1)(cid:1) जजजजोोोोड़ड़ड़ड़ ((((11111111वववव&&&& ययययोोोोजजजजननननाााा)))) 77778888777700000000 66662222333377774444 55554444999966664444 <नोट: (cid:1)आरबीसी(cid:1)5(cid:2)(cid:4)(cid:3)(cid:4)(cid:1)(cid:15)%(cid:27)(cid:16)!(cid:16)26(cid:1)को के(cid:2)(cid:4) ीय (cid:8)े(cid:9) के लUय 78,700 मेगावाट म (cid:30)शािमल ,कया गया। अब यह प<रयोजना िनजी (cid:8)े(cid:9) म(cid:30) है। (cid:1) सी=(cid:1)के(cid:3)(cid:5) ीय (cid:8)े(cid:9);(cid:1)एस =(cid:1)रा(cid:12)य (cid:8)े(cid:9) ;(cid:1)पी =(cid:1)िनजी (cid:8)े(cid:9) ;(cid:1)कमीशंड:(cid:1)(cid:21)थ ा(cid:13)(cid:19)(cid:31);(cid:1)यूसी : िनमा(cid:18)णाधीन (cid:1)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 73 अअअअ((((ययययाााायययय 3333 |q ििििवववव तततत ककककेेेे ििििललललएएएए ममममाााागगंंगगंं पपपपूवूवूवूवाााानन(cid:22)(cid:22)नन(cid:22)(cid:22) ममुुममुु ाााानननन 3333....0000 पपपपृUृUृUृUठठ ठठ भभभभििूूििूू मममम ';d हमारी अथ2Kय व8थ ा के िविभCन (cid:18)ेR* क(cid:25) भावी िव#ुत आव ता को पूरा करन े के िलए आव)य क उQप ादन (cid:18)मता अिभवृि(cid:23) क(cid:25) आयोजना के िलए मांग का मूjय ांकन करना एक अिनवाय2 पूव2 अहत2 ा ह ै । योजनागत fL प3रयोजनाE का <कार और अव थित काफ(cid:25) हद तक प3रयोजना के प3रमाण, 8थ ािनक िवतरण के साथ-साथ 4दन, मौसम और वाPषक आधार पर मांग के प3रवतन2 पर िनभर2 करते ह O । अत: भिव!य के िलए (cid:18)मता अिभवृि(cid:23) हते ु िव)व सनीय आयोजना भावी मांग के प3रशु(cid:23) मूjय ांकन पर अQय िधक िनभ2र करती ह ै । रा!" ीय िव#ुत नीित म(cid:17) यह भी उjल ेख 4कया गया ह ै 4क सीईए रा!" ीय िव#ुत योजना तैयार करते समय िविभCन (cid:18)ेR* के िलए अjप कािलक और दीघ2कािलक मांग पूवा2नमु ान <8त ुत करेगा । 3333....1111ककककेेेे>>>>WW WW ीीीीयययय ििििववववIIIIततुुततुु (cid:1)(cid:1)(cid:1)(cid:1)ााााििििधधधधककककररररणणणण GGGGाााारररराााा ममममाााागगंंगगंं मममम++ूू++ूू यय यय ााााककंंककंं नननन----ििििववववIIIIततुुततुु पपपपााााववववरररर ससससवववव(cid:26)(cid:26)XX(cid:26)(cid:26)XX णणणण ((((ईईईईपपपपीीीीएएएएसससस ////ररररपपपपोोोोटटटट(cid:22)(cid:22)))(cid:22)(cid:22))) केCfीय िव#ुत <ािधकरण aारा िव#ुत पावर सवh(cid:18)ण सिमित ग3ठत क(cid:25) जाती ह ै । इसम(cid:17) िव#ुत (cid:18)ेR के िविभCन पणधारक* का <ितिनिधQव होता ह ै । यह सिमित पीक िव#ुत लोउ और िव#ुत ऊजा 2 आव)य कता दोन* के संदभ 2 म(cid:17) िव#ुत क(cid:25) मांग का पूवा2नुमान लगाती ह ै । सीईए िनयिमत Nप स े िव#ुत पावर सवh(cid:18)ण 3रपोट2 जारी करता रहा ह ै । इस सिमित aारा जारी क(cid:25) गयी नवीनतम 3रपोट2 18व(cid:7) ईपीएस 3रपोट2 ह ै िजसे J<ट कराया जा रहा ह ै । इस 3रपोट2 म(cid:17) <Qय ेक राoय , संघ राoय , (cid:18)ेR और अिखल भारतीय 8त र पर िव#ुत क(cid:25) मांग का वष2वार िव8त ृत पूवा2नुमान 4दया जाता ह ै । यह पूवा2नुमान 12व(cid:7) पंचवष(cid:12)य योजना के अंत म(cid:17) अथा2त् 2016-17 लगाए जाएगं े ~~ और यु3टिलटी <णािलय* के िलए 13व(cid:7) और 14 व(cid:7) पचं वष(cid:12)य योजना के सीमांत वष2 अथा2त 2021-22 और 2026-27 के िलए अनुमािनत और सभं ािवत िव#तु मांग को शािमल 4कया जाएगा । दशे क(cid:25) मांग पर 12व(cid:7) और kZ 13व(cid:7) योजना के दौरान डीएसएम और ऊज सरं (cid:18)ण उपाय* के <भाव को 18व(cid:7) ईपीएस मांग को अंितम Nप दते े समय उपयुdत ढंग से (cid:2)य ान म(cid:17) रखा गया ह ै । 18व(cid:7) ईपीएस मसौदा 3रपोट2, जो अभी हाल ही म(cid:17) जारी क(cid:25) गयी ह ै म(cid:17) सरकार (सरकार*) aारा बनाई गई रा!" ीय/राoय स त् रीय नीितय* के उ()े य * और ल%य * को पूरा करने के िलए िविभCन िवशेषताए ं शािमल क(cid:25) गयी ह O । कृिष, औ#ोिगक, वािणिoयक (cid:18)ेR* के साथ-साथ घरेलू 8थ ापनाE म(cid:17) उzच द(cid:18)ता और डीएसएम उपाय* को बढ़ावा दने े के िलए िव#ुत मांग पूवा2नुमान तैयार करते समय अपेि(cid:18)त (cid:2)य ान 4दया गया ह ै । इसके अलावा िविभCन राoय */संघ राoय * के साथ परामश2 स े मूjय ां4कत टी एvड डी हािन कम करने िवषयक ल%य * के आधार पर भी ईपीएस के पूवा2नुमान* क(cid:25) गणना क(cid:25) गयी ह ै । दीघ2कालीन पूवा2नुमान वष2 2016-17 और 2021-22 तक टी एvड डी हािनय* को Bमश: 18.9% और 15.4% तक कम करने पर आधा3रत ह O । ममममाााागगंंगगंं पपपप<<<<ररररदददद>>>>ृृृृ यय यय 3333....2222 ब,त स े मांग प3रद)ृ य क(cid:25) गणना क(cid:25) गयी ह ै और उनम(cid:17) स े सही िवकjप चुना जाना ह ै िजससे 4क 12व(cid:7) और 13व(cid:7) पंचवष(cid:12)य योजनाE के िलए सवा2िधक प3रशु(cid:23) उQप ादन (cid:18)मता अिभवृि(cid:23) काय2Bम तैयार करन े हते ु आयोजना अ(cid:2)य यन करने के िलए सबस े उपयुdत मांग पूवा2नुमान को अपनाया जा सके । इस अ(cid:2)य ाय म(cid:17) िव)ल ेिषत िविभCन संभािवत मांग प3रद)ृ य िनbन ानुसार ह O :- पपपप<<<<ररररदददद>>>>ृृृृ यययय :::: 1111 वष2 2009-10 तक वा8त िवक मांग और 4फर 12व(cid:7) योजना म(cid:17) िपछले कुछ वषU क(cid:25) वा8त िवक संिचत वृि(cid:23) दर(सीएजीआर) लागू करना और 4फर 13व(cid:7) योजना म(cid:17) ईपीएस वृि(cid:23) दर को लागू करना ।74 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] पपपप////ररररददददYYYYृृृृ यय यय :::: 2222 वष2 2009-10 तक वा8त िवक मांग के साथ 9% क(cid:25) जीडीपी वृि(cid:23) दर और 12व(cid:7) तथा 13व(cid:7) योजनाE के दौरान 0.8 <Qय ा8थ ता । पपपप////ररररददददYYYYृृृृ यय यय :::: 3333 वष2 2009-10 तक वा8त िवक मांग के साथ 9% क(cid:25) जीडीपी वृि(cid:23) दर और 12व(cid:7) योजना के दौरान 0.9 <Qय ा8थ ता तथा 13व(cid:7) योजना के दौरान 0.8 <Qय ा8थ ता । पपपप////ररररददददYYYYृृृृ यय यय :::: 4444 वष2 2009-10 तक वा8त िवक मांग के साथ 9% क(cid:25) जीडीपी वृि(cid:23) दर और और 12व(cid:7) तथा 13व(cid:7) योजनाE के दौरान 0.95 <Qय ा8थ ता । पपपप////ररररददददYYYYृृृृ यय यय :::: 5555 वष2 2009-10 तक वा8त िवक मांग के साथ 9% क(cid:25) जीडीपी वृि(cid:23) दर और 12व(cid:7) योजना के दौरान 1.0 <Qय ा8थ ता तथा 13व(cid:7) योजना के दौरान 0.9 <Qय ा8थ ता । पपपप////ररररददददYYYYृृृृ यय यय :::: 6666 18व(cid:7) ईपीएस के अनुसार मागं पूवा2नुमान 12व(cid:7) और 13व(cid:7) पंचवष(cid:12)य योजना के अंत तक वष2वार ऊजा2 आव)य कता पूवा2नुमान के िववरण तािलका 3.1 एवं 3.2 म(cid:17) नीचे 4दये गये ह O : ततततााााििििललललककककाााा 3333....1111 12व(cid:7) योजना के िलए ऊजा2 आव)य कता पूवा2नुमान का प3रद)ृ य पपपप(cid:2)(cid:2)(cid:2)(cid:2)रररर....----1111 जजजजीीीीआआआआरररर पपपप(cid:2)(cid:2)(cid:2)(cid:2)रररर....----2222 जजजजीीीीआआआआरररर पपपप(cid:2)(cid:2)(cid:2)(cid:2)रररर....----3333 जजजजीीीीआआआआरररर पपपप(cid:2)(cid:2)(cid:2)(cid:2)रररर....----4444 जजजजीीीीआआआआरररर पपपप(cid:2)(cid:2)(cid:2)(cid:2)रररर....----5555 जजजजीीीीआआआआरररर पपपप(cid:2)(cid:2)(cid:2)(cid:2)रररर----6666 ववववषषषष (cid:6)(cid:6)(cid:6)(cid:6) ववववाााा(cid:8)(cid:8)(cid:8)(cid:8)तततत ििििववववकककक ईईईईआआआआरररर %%%% ववववाााा(cid:8)(cid:8)(cid:8)(cid:8)तततत ििििववववकककक %%%% ववववाााा(cid:8)(cid:8)(cid:8)(cid:8)तततत ििििववववकककक %%%% ववववाााा(cid:8)(cid:8)(cid:8)(cid:8)तततत ििििववववकककक %%%% ववववाााा(cid:8)(cid:8)(cid:8)(cid:8)तततत ििििववववकककक %%%% 11118888वववव(cid:6)(cid:6)(cid:6)(cid:6) ((((2222000000009999----11110000 ततततकककक)))) ईईईईआआआआरररर ((((2222000000009999---- ईईईईआआआआरररर ईईईईआआआआरररर ((((2222000000009999---- ईईईईआआआआरररर ईईईईपपपपीीीीएएएएसससस ववववाााा(cid:3)(cid:3)(cid:3)(cid:3)तततत ििििववववकककक ससससीीीीएएएएजजजजीीीीआआआआरररर 11110000 ततततकककक)))) औऔऔऔरररर ((((2222000000009999---- 11110000 ततततकककक)))) &&&& ((((2222000000009999---- ककककेेेे ससससााााथथथथ 11110000 ततततकककक)))) 11110000 ततततकककक)))) &&&& 9999%%%% जजजजीीीीडडडडीीीीपपपपीीीी;;;; 9999%%%% जजजजीीीीडडडडीीीीपपपपीीीी;;;; &&&& 9999%%%% 9999%%%% 0000....8888 0000....99995555 (cid:11)(cid:11)(cid:11)(cid:11)(cid:12)(cid:12)(cid:12)(cid:12)यययय ाााा(cid:8)(cid:8)(cid:8)(cid:8)थथथथ तततताााा जजजजीीीीडडडडीीीीपपपपीीीी;;;; (cid:11)(cid:11)(cid:11)(cid:11)(cid:12)(cid:12)(cid:12)(cid:12)यययय ाााा(cid:8)(cid:8)(cid:8)(cid:8)थथथथ तततताााा जजजजीीीीडडडडीीीीपपपपीीीी;;;; 0000....9999 1111....0000 (cid:11)(cid:11)(cid:11)(cid:11)(cid:12)(cid:12)(cid:12)(cid:12)यययय ाााा(cid:8)(cid:8)(cid:8)(cid:8)थथथथ तततताााा (cid:11)(cid:11)(cid:11)(cid:11)(cid:12)(cid:12)(cid:12)(cid:12)यययय ाााा(cid:8)(cid:8)(cid:8)(cid:8)थथथथ तततताााा ववववििृृििृृ(cid:17)(cid:17)(cid:17)(cid:17) ववववििृृििृृ(cid:17)(cid:17)(cid:17)(cid:17) ववववििृृििृृ(cid:17)(cid:17)(cid:17)(cid:17) ववववििृृििृृ(cid:17)(cid:17)(cid:17)(cid:17) ववववििृृििृृ(cid:17)(cid:17)(cid:17)(cid:17) 2222000000003333----00004444 555555559999222266664444 555555559999222266664444 555555559999222266664444 555555559999222266664444 555555559999222266664444 2222000000004444----00005555 555599991111333377773333 555599991111333377773333 555599991111333377773333 555599991111333377773333 555599991111333377773333 2222000000005555----00006666 666633331111555555554444 666633331111555555554444 666633331111555555554444 666633331111555555554444 666633331111555555554444 2222000000006666----00007777 666699990000555588887777 666699990000555588887777 666699990000555588887777 666699990000555588887777 666699990000555588887777¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 75 2222000000007777----00008888 777733339999333344443333 777733339999333344443333 777733339999333344443333 777733339999333344443333 777733339999333344443333 2222000000008888----00009999 777777777777000033339999 777777777777000033339999 777777777777000033339999 777777777777000033339999 777777777777000033339999 2222000000009999----11110000 888833330000555599994444 888833330000555599994444 888833330000555599994444 888833330000555599994444 888833330000555599994444 2222000011110000----11111111 888899990000111122223333 888899990000333399997777 888899997777888877772222 999900001111666611110000 999900005555333344447777 2222000011111111----11112222 999955553333999911119999 999955554444555500005555 999977770000666600000000 999977778888666699997777 999988886666888822229999 999922229999111111111111 2222000011112222----11113333 1111000022222222222288887777 7777....11117777 1111000022223333222233330000 7777....2222 1111000044449999222211118888 8888....1111 1111000066662222333377776666 8888....6666 1111000077775555666644443333 9999....0000 1111000000007777666699994444 2222000011113333----11114444 1111000099995555555555555555 1111000099996666999900002222 1111111133334444222200005555 1111111155553333222200009999 1111111177772222444455551111 1111000088884444666611110000 2222000011114444----11115555 1111111177774444000077774444 1111111177775555888877779999 1111222222226666000077776666 1111222255551111888800009999 1111222277777777999977772222 1111111166667777777733331111 2222000011115555----11116666 1111222255558888222222221111 1111222266660000555544443333 1111333322225555333388888888 1111333355558888888833338888 1111333399992222999988889999 1111222255557777555588889999 2222000011116666----11117777 1111333344448888333399999999 1111333355551111333300002222 1111444433332222777744444444 1111444477775555000011119999 1111555511118888333355558888 1111333355554444888877774444 तािलका 3333....2222 13व(cid:7) योजना के िलए ऊजा2 आव)य कता पूवा2नुमान का प3रद)ृ य ववववषषषष (cid:12)(cid:12) (cid:12)(cid:12) पपपप’’’’रररर....----1111 जजजजीीीीआआआआरररर पपपप’’’’रररर....----2222 जजजजीीीी पपपप’’’’रररर....----3333 जजजजीीीी पपपप’’’’रररर....----4444 जजजजीीीी पपपप’’’’रररर....----5555 जजजजीीीी पपपप’’’’रररर----6666 आआआआरररर आआआआरररर आआआआरररर आआआआरररर ववववाााा((((तत तत ििििववववकककक %%%% ववववाााा((((तत तत ििििववववकककक %%%% ववववाााा((((तत तत ििििववववकककक %%%% ववववाााा((((तत तत ििििववववकककक %%%% ववववाााा((((तत तत ििििववववकककक %%%% 11118888वववव)))) ईईईईपपपपीीीीएएएएसससस ईईईईआआआआरररर ((((2222000000009999---- ईईईईआआआआरररर ईईईईआआआआरररर ईईईईआआआआरररर ईईईईआआआआरररर ((((2222000000009999----11110000 ((((2222000000009999----11110000 ((((2222000000009999---- ((((2222000000009999---- 11110000 ततततकककक)))) ववववाााा((((तत तत ििििववववकककक ततततकककक)))) औऔऔऔरररर ततततकककक)))) &&&& 9999%%%% 11110000 ततततकककक)))) 11110000 ततततकककक)))) ससससीीीीएएएएजजजजीीीीआआआआरररर ककककेेेे 9999%%%% जजजजीीीीडडडडीीीीपपपपीीीी;;;; &&&& 9999%%%% &&&& 9999%%%% ससससााााथथथथ जजजजीीीीडडडडीीीीपपपपीीीी;;;; 0000....9999 जजजजीीीीडडडडीीीीपपपपीीीी;;;; जजजजीीीीडडडडीीीीपपपपीीीी;;;; 0000....8888 (cid:25)(cid:25)(cid:25)(cid:25)!!!!यय यय ाााा((((थथ थथ तततताााा 0000....99995555 1111....0000 (cid:25)(cid:25)(cid:25)(cid:25)!!!!यय यय ाााा((((थथ थथ तततताााा (cid:25)(cid:25)(cid:25)(cid:25)!!!!यय यय ाााा((((थथ थथ तततताााा (cid:25)(cid:25)(cid:25)(cid:25)!!!!यय यय ाााा((((थथ थथ तततताााा ववववििृृििृृ.... ववववििृृििृृ.... ववववििृृििृृ.... ववववििृृििृृ.... ववववििृृििृृ.... 2222000011117777----11118888 1111444444443333333322226666 7777....1111 1111444444448888555599995555 7777....2222 1111555533335555999900002222 7777....2222 1111666600001111111133333333 8888....6666 1111666644441111333344445555 8888....1111 1111444455550000999988882222 2222000011118888----11119999 1111555544444444999933336666 1111555555552222888899994444 1111666644446666444488887777 1111777733338888000033330000 1111777777774444222299994444 1111555555552222000000008888 2222000011119999----22220000 1111666655553333777700000000 1111666666664444777700003333 1111777766665555000033334444 1111888888886666666633331111 1111999911118888000011112222 1111666666660000777788883333 2222000022220000----22221111 1111777777770000111122220000 1111777788884444555566661111 1111888899992222111111116666 2222000044447777999933338888 2222000077773333333377771111 1111777777778888111100009999 2222000022221111----22222222 1111888899994444777733336666 1111999911113333000055550000 2222000022228888333344448888 2222222222223333000033337777 2222222244441111333311114444 1111999900004444888866661111 उपयु2dत पूवा2नुमान* म(cid:17) डीएसएम और ऊजा2 द(cid:18)ता उपाय* से बचत शािमल नह(cid:7) ह O जब4क 18व(cid:7) ईपीएस 3रपोट2 %%%% के पूवा2नुमान* म(cid:17) इस बचत को शािमल 4कया गया ह ै । वष2 2009-10 म(cid:17) वा8त िवक लोड घटक 79.5 था । अतीत म(cid:17) मांग अनुमान के अनुNप नह(cid:7) बढ़ी ह ै और अCय िविभCन कारण* स े अनुमान के अनुNप लोड घटक का घटता ,आ Nझान दखे ने को नह(cid:7) िमला ह ै । अत: यह आव)य क होगा 4क लोड घटक म(cid:17) काफ(cid:25) कमी के साथ जीडीपी वृि(cid:23) दर प3रद)ृ य का अनुमान लगाया जाए । अत: वष2 2016-17 के िलए पीक मांग का पूवा2नुमान लगाते समय लगभग 78% के लोड घटक का िवचार 4कया गया ह ै ।76 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Åij िवचार 4कए गए िविभCन प3रद)ृ य * म(cid:17) ऊजा2 आव)य कता और पीक मांग का साराशं और वष2 2016-17 तक % % 78 और 2021-22 तक 76 लोड घटक का सारांश िनbन ानुसार ह:ै ततततााााििििललललककककाााा 3333....3333 ििििववववििििभभभभ(cid:24)(cid:24)(cid:24)(cid:24)नन नन ममममाााागगगगंंंं पपपप<<<<ररररदददद>>>>ृृृृ यय यय –ऊऊऊऊजजजजाााा (cid:4)(cid:4) (cid:4)(cid:4)आआआआवववव>>>>यय यय ककककतततताााा औऔऔऔरररर पपपपीीीीकककक ममममाााागगंंगगंं ((((ऊऊऊऊजजजजाााा (cid:4)(cid:4) (cid:4)(cid:4)ससससररंंररंं 4444णणणण औऔऔऔरररर डडडडीीीीएएएएससससएएएएमममम उउउउपपपपााााययययBBBB ककककेेेे (cid:1)(cid:1)(cid:1)(cid:1)भभभभाााावववव ककककेेेे ििििबबबबननननाााा)))) जजजजीीीीडडडडीीीीपपपपीीीी ववववििृृििृृ (cid:9)(cid:9)(cid:9)(cid:9) ददददरररर ऊऊऊऊजजजजाााा (cid:22)(cid:22) (cid:22)(cid:22)आआआआवववव(cid:24)(cid:24)(cid:24)(cid:24)यय यय ककककतततताााा ऊऊऊऊजजजजाााा (cid:22)(cid:22) (cid:22)(cid:22) पपपपीीीीकककक ममममाााागगंंगगंं पपपपीीीीकककक ममममाााागगंंगगंं जजजजीीीीडडडडीीीीपपपपीीीी ििििवववव(cid:12)(cid:12)(cid:12)(cid:12)ततुुततुु //// आआआआवववव(cid:24)(cid:24)(cid:24)(cid:24)यय यय ककककतततताााा (cid:15)(cid:15)(cid:15)(cid:15)(cid:16)(cid:16)(cid:16)(cid:16)यय यय ाााा(cid:19)(cid:19)(cid:19)(cid:19)थथ थथ तततताााा ((((ममममेगेगेगेगाााा (cid:6)(cid:6)(cid:6)(cid:6)ककककललललोोोोववववााााटटटट ((((ममममगगेेगगेे ाााा ववववााााटटटट )))) ((((ममममगगेेगगेे ाााा ववववााााटटटट )))) ((((ममममेगेगेगेगाााा घघघघटटंंटटंं ाााा)))) (cid:6)(cid:6)(cid:6)(cid:6)ककककललललोोोोववववााााटटटट घघघघटटंंटटंं ाााा)))) 2222000011116666----11117777 2222000022221111----22222222 2222000011116666----11117777 2222000022221111----22222222 ववववाााा;;;;तत तत ििििववववकककक ऊऊऊऊजजजजाााा (cid:4)(cid:4) (cid:4)(cid:4) 0.80 1111333355551111333300002222 1111999911113333000055550000 111199997777777766667777 222288887777333344448888 आआआआवववव>>>>यय यय ककककतततताााा 0.90/0.8 1111444433332222777744444444 2222000022228888333344448888 222200009999666688886666 333300004444666666667777 ((((2222000000009999----11110000 ततततकककक)))) 12व+/ 13व+ ववववििृृििृृ 7777 ददददरररर ककककेेेे 9999%%%% योजना- म(cid:30) ससससााााथथथथ 0.95 1111444477775555000011119999 2222222222223333000033337777 222211115555888877773333 333333333333999911110000 1.0/0.9 1111555511118888333355558888 2222222244441111333311114444 222222222222222211116666 333333336666666655555555 12व+/13व+ योजना- म(cid:30) ववववाााा;;;;तत तत ििििववववकककक ऊऊऊऊजजजजाााा (cid:4)(cid:4) (cid:4)(cid:4)आआआआवववव>>>>यययय ककककतततताााा ((((2222000000009999----11110000 1111333344448888333399999999 1111888899994444777733336666 222200002222555533335555 222288884444555599998888 ववववाााा;;;;तत तत ििििववववकककक ववववििृृििृृ 7777 ददददरररर ककककेेेे ससससााााथथथथ ततततकककक)))) ईईईईपपपपीीीीएएएएसससस 11118888वववव(cid:7)(cid:7)(cid:7)(cid:7) 1111333355554444888877774444 1111999900004444888866661111 111199999999555544440000 222288883333444477770000 बीईई के ऊजा2 द(cid:18)ता उपाय* और डीएसएम काय2Bम के कारण पीक मांग म(cid:17) कमी और ऊजा 2 आव)य कता संबंधी बचत को (cid:2)य ान म(cid:17) रखत े ,ए 12व(cid:7) पंचवष(cid:12)य योजना के अंत म(cid:17) ऊजा2 आव)य कता म(cid:17) लगभग 60 िबिलयन यूिनट और पीक मांग म(cid:17) लगभग 12,000 मेगावाट क(cid:25) कमी क(cid:25) गयी और 13व(cid:7) योजना के अंत म(cid:17) उपयु2dत म(cid:17) से <Qय ेक प3रद)ृ य (18व(cid:7) ईपीएस को छोड़कर) पीक मांग म(cid:17) 15,000 मेगावाट क(cid:25) कमी क(cid:25) गयी । इस <कार संशोिधत 4कये गये मांग संबंधी आंकड़ े नीचे तािलका म(cid:17) 4दये गये ह O :¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 77 तािलका 3.4 ििििववववििििभभभभ(cid:24)(cid:24)(cid:24)(cid:24)नन नन ममममाााागगगगंंंं पपपप<<<<ररररदददद>>>>ृृृृ यय यय –ऊऊऊऊजजजजाााा (cid:4)(cid:4) (cid:4)(cid:4)आआआआवववव>>>>यय यय ककककतततताााा औऔऔऔरररर पपपपीीीीकककक ममममाााागगंंगगंं ((((ऊऊऊऊजजजजाााा (cid:4)(cid:4) (cid:4)(cid:4)ससससररंंररंं 4444णणणण औऔऔऔरररर डडडडीीीीएएएएससससएएएएमममम उउउउपपपपााााययययBBBB ककककेेेे (cid:1)(cid:1)(cid:1)(cid:1)भभभभाााावववव ककककोोोो CCCCयययय ाााानननन मममम (cid:16)(cid:16) (cid:16)(cid:16)ररररखखखखतततत ेेेेEEEEएएएए)))) जजजजीीीीडडडडीीीीपपपपीीीी ववववििृृििृृ (cid:9)(cid:9)(cid:9)(cid:9) ददददरररर ऊऊऊऊजजजजाााा (cid:22)(cid:22) (cid:22)(cid:22)आआआआवववव(cid:24)(cid:24)(cid:24)(cid:24)यय यय ककककतततताााा ऊऊऊऊजजजजाााा (cid:22)(cid:22) (cid:22)(cid:22)आआआआवववव(cid:24)(cid:24)(cid:24)(cid:24)यय यय ककककतततताााा पपपपीीीीकककक ममममाााागगंंगगंं पपपपीीीीकककक ममममाााागगंंगगंं जजजजीीीीडडडडीीीीपपपपीीीी ििििवववव(cid:12)(cid:12)(cid:12)(cid:12)ततुुततुु //// (cid:15)(cid:15)(cid:15)(cid:15)(cid:16)(cid:16)(cid:16)(cid:16)यय यय ाााा(cid:19)(cid:19)(cid:19)(cid:19)थथ थथ तततताााा ((((ममममेगेगेगेगाााा ((((ममममेगेगेगेगाााा ((((ममममगगेेगगेे ाााा ववववााााटटटट )))) ((((ममममगगेेगगेे ाााा ववववााााटटटट )))) (cid:6)(cid:6)(cid:6)(cid:6)ककककललललोोोोववववााााटटटट घघघघटटंंटटंं ाााा)))) (cid:6)(cid:6)(cid:6)(cid:6)ककककललललोोोोववववााााटटटट घघघघटटंंटटंं ाााा)))) 2222000011116666----11117777 2222000022221111----22222222 2222000011116666----11117777 2222000022221111----22222222 ववववाााा;;;;तत तत ििििववववकककक ऊऊऊऊजजजजाााा (cid:4)(cid:4) (cid:4)(cid:4) 1111333322221111999977772222 1111888877777777333311113333 111188885555999966667777 222277772222333344448888 0.80 आआआआवववव>>>>यय यय ककककतततताााा 1111444400003333444411114444 1111999999992222666611111111 111199997777666688886666 222288889999666666667777 0.90/0.8 ((((2222000000009999----11110000 ततततकककक)))) 9999 %%%% 12व+/ 13व+ ववववििृृििृृ 7777 ददददरररर ककककेेेे ससससााााथथथथ योजना- म(cid:30) 1111444444445555666688889999 2222111188887777333300000000 222200003333888877773333 333311118888999911110000 0.95 1111444488889999000022228888 2222222200005555555577777777 222211110000222211116666 333322221111666655555555 1.0/0.9 12व+/ 13व+ योजना- म(cid:30) ववववाााा;;;;तत तत ििििववववकककक ऊऊऊऊजजजजाााा (cid:4)(cid:4) (cid:4)(cid:4)आआआआवववव>>>>यययय ककककतततताााा 1111333311119999000066669999 1111888855558888999999999999 111199990000555533335555 222266669999555599998888 ((((2222000000009999----11110000 ततततकककक)))) ववववाााा;;;;तत तत ििििववववकककक ववववििृृििृृ 7777 ददददरररर ककककेेेे ससससााााथथथथ ईईईईपपपपीीीीएएएएसससस 1111333355554444888877774444 1111999900004444888866661111 111199999999555544440000 222288883333444477770000 11118888वववव(cid:7)(cid:7)(cid:7)(cid:7) * *बीईई के ऊजा2 काय2(cid:18)मता उपाय* और डीएस काय2Bम* के प3रणाम8व Nप पीक मांग और ऊजा2 आव)य कता म(cid:17) कमी को 18व(cid:7) ईपीएस आंकड़* से कम नह(cid:7) 4कया गया ह ै dय *4क 18व(cid:7) ईपीएस पीक मांग और ऊजा2 आव)य कता क(cid:25) गणना करते समय इनको पहले ही (cid:2)य ान म(cid:17) रखा गया ह ै । 3333....3333 अअअअननननशशुुशशुु ििंंििंं ससससतततत ममममाााागगंंगगंं पपपप////ररररददददYYYYृृृृ यय यय 12व+ और 13व+ योजना अविध के िलए 1मता अिभवृि4 आव5 यकता का म6ू याकं न करने के उ8े5 य से उ9 पादन आयोजना अ:य यन; के िलए उपर बताए गए प=रद5ृ य ; के अलावा 18व+ ईपीएस पूवा(cid:19)नमु ान; के संगत मांग पर िवचार Aकया गया ह ै। इन मांग पूवा2नुमान* पर इसिलए िवचार 4कया गया dय *4क ये िविभCन पणधारक* वाली िव#ुत सवh(cid:18)ण सिमित aारा लगाए गए भार पूवा2नुमान* क(cid:25) िव8त ृत और Kय वि8थत पहल पर आधा3रत ह O । ये पूवा2नुमान लगाने के िलए आंिशक अंितम <योग प(cid:23)ित को अपनाया गया ह ै । ऊजा 2 द(cid:18)ता और मांग प(cid:18) <बंधन उपाय* के आंिशक <भाव क(cid:25) गणना करते समय मांग पूवा2नुमान* म(cid:17) गैर <ितबंिधत मांग के पूवा2नुमान लगाए जाते ह O । गैर <ितबंिधत मागं पर आधा3रत उQप ादन आयोजना अ(cid:2)य यन को अिनवाय2 और आव)य क समझा गया । हालां4क ऊजा2 काय2कुशलता Iय ूरो के सघन <यास* और अCय पहल*, िजनम(cid:17) सरकार aारा शुN 4कए गए िविभC न <यास* के प3रणाम8व Nप िव#ुत (cid:18)ेR म(cid:17) हो रह े ढांचागत प3रवत2न* को (cid:2)य ान म(cid:17) रखा गया ह,ै के अित3रdत <भाव पर इस प3रद)ृ य म (cid:17) िवचार नह(cid:7) 4कया गया ह ै । वष2 2012-13 स े 2021-22 के िलए पीक मांग और ऊजा2 आव)य कता सबं ंधी संगत पूवा2नुमान के वष2वार/राoय वार/(cid:18)ेRवार िववरण अअअअननननबबुुबबुु ंधंधंधंध 3333....1111 म(cid:17) 4दये गए ह O । 12व(cid:7) पंचवष(cid:12)य योजना के अंत (2026-27) तक दशे म(cid:17) पीक मांग और ऊजा2 आव)य कता के िलए दीघ2कालीन पूवा2नुमान का संि(cid:18)=त िववरण तािलका 3.5 म(cid:17) नीच े 4दया गया ह ै78 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ततततााााििििललललककककाााा 3333....5555 ववववषषषष(cid:4)(cid:4)(cid:4)(cid:4)2222000022226666----22227777 ककककेेेे ििििललललएएएए ददददीीीीघघघघकक(cid:22)(cid:22)कक(cid:22)(cid:22) ााााललललीीीीनननन पपपपववूूववूू ाााानन(cid:22)(cid:22)नन(cid:22)(cid:22) ममुुममुु ाााानननन (cid:25)(cid:25)(cid:25)(cid:25)(cid:27)(cid:27)ेे(cid:27)(cid:27)ेे (cid:15)(cid:15)(cid:15)(cid:15)ाााायययय(cid:28)(cid:28)(cid:28)(cid:28)ीीीीपपपप ऊऊऊऊजजजजाााा (cid:22)(cid:22) (cid:22)(cid:22)आआआआवववव(cid:24)(cid:24)(cid:24)(cid:24)यय यय ककककतततताााा बबबबीीीीययययूूूू पपपपीीीीकककक ललललोोोोडडडड जजजजीीीीडडडड(cid:29)(cid:29)(cid:29)(cid:29)(cid:30)(cid:30) (cid:30)(cid:30) यय यय ूूूू //// (((( )))) (((( )))) उउउउFFFFतत तत ररररीीीी 44445555ेेेे 888844440000....66667777 111122221111....99998888 पपपपििििGGGGममममीीीी (cid:26)(cid:26)(cid:26)(cid:26)KKेेKKेे 777755557777....33332222 111122220000....66662222 ददददिििि4444णणणणीीीी (cid:26)(cid:26)(cid:26)(cid:26)KKेेKKेे 777722227777....99991111 111111118888....77776666 पपपपववूूववूू 1111 (cid:26)(cid:26)(cid:26)(cid:26)KKेेKKेे 333344449999....44441111 55553333....00005555 पपपपववूूववूू HHHHFFFFतत तत रररर (cid:26)(cid:26)(cid:26)(cid:26)KKेेKKेे 33333333....99995555 6666....11117777 अअअअडडंंडडंं ममममाााानननन औऔऔऔरररर ििििननननककककोोोोबबबबाााारररर 0000....77771111 0000....111122225555 IIIIीीीीपपपपससससममममहहूूहहूू लललल4444IIIIीीीीपपपप 0000....00008888 0000....000022223333 अअअअििििखखखखलललल भभभभााााररररततततीीीीयययय ;;;;तत तत रररर 2222777711110000 444400000000....7777 उ9प ादन आयोजना कार(cid:19)वाई के उ8े5य से 12व+ और 13व+ योजना के अंत तक अपनाए जाने हते ु 18व+ ईपीएस =रपोट(cid:19) के अनसु ार मांग पूवान(cid:19) मु ान िनDन ानसु ार ह:E ततततााााििििललललककककाााा 3333....6666 उ9प ादन आयोजना अ: ययन; के िलए अपनायी गयी मांग ऊऊऊऊजजजजाााा (cid:22)(cid:22) (cid:22)(cid:22)आआआआवववव(cid:24)(cid:24)(cid:24)(cid:24)यय यय ककककतततताााा पपपपीीीीकककक ललललोोोोडडडड ममममगगेेगगेे ााााववववााााटटटट (((( )))) ववववििृृििृृ (cid:14)(cid:14)(cid:14)(cid:14) 2222000011116666----11117777 1111333355554444888877774444 111199999999555544440000 11112222वववव!!!! ययययोोोोजजजजननननाााा ककककाााा ससससीीीीममममााााततततंंंं ववववषषषष(cid:4)(cid:4)(cid:4)(cid:4) (((( )))) 2222000022221111----22222222 1111999900004444888866661111 222288883333444477770000 11113333वववव!!!! ययययोोोोजजजजननननाााा ककककाााा ससससीीीीममममााााततततंंंं ववववषषषष(cid:4)(cid:4)(cid:4)(cid:4) (((( )))) एक(cid:25)कृत ऊजा2 नीित म(cid:17) पीक मांग का अनुमान घटती ,ई लोड फैdट र <णाली के अनुसार लगाया गया ह,ै अथात2 ् 2010 तक 76% , 2011-12 से 2015-16 के िलए 74% 2016-17 से 2021-22 और उसके बाद के िलए 72% ह ै और ये मांग वष2 2004-05 तक वा8त िवक खपत पर आधा3रत ह O तथा इनम(cid:17) कैि=टव मांग भी शािमल ह ै । दसू री ओर 18व(cid:7) ईपीएस 3रपोट2 के मांग पूवा2नुमान 2009-10 तक वा8त िवक मागं पर आधा3रत ह O और ये िव#ुत कंपिनय* के मांग पूवा2नुमान के अनुNप ह।O 18व(cid:7) ईपीएस 3रपोट2 के मांग पूवा2नुमान* म(cid:17) मांग प(cid:18) <बंधन तथा ऊजा2 काय2कुशलता Iय रू ो aारा <8त ािवत ऊजा2 संर(cid:18)ण उपाय* को भी (cid:2)य ान म(cid:17) रखा गया ह ै । अत: उQप ादन आयोजना के उ()े य से 18व(cid:7) ईपीएस 3रपोट2 के मांग पूवा2नुमान* को भी (cid:2)य ान म(cid:17) रखा जाए ।¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 79 उपसंहार 3333....4444 • 12व(cid:7) पंचवष(cid:12)य योजना अविध के िलए (cid:18)मता अिभवृि(cid:23) काय2Bम के मूjय ांकन और 13व(cid:7) पंचवष(cid:12)य योजना के िलए आव)य क सभं ािवत (cid:18)मता अिभवृि(cid:23) के िलए 18व(cid:7) ईपीएस मांग आकं ड़* को अपनाया जाए dय *4क ईपीएस aारा 4कया गया मांग मूjय ांकन सभी पणधारक* को शािमल करते ,ए अंितम <योdत ा प(cid:23)ित पर आधा3रत एक Kय ापक कार2वाई ह ै । • 18व(cid:7) ईपीएस मांग आंकड़* को (cid:2)य ान म (cid:17) रखत े ,ए 12व(cid:7) और 13व(cid:7) योजनाE के िलए अिधकतम (cid:18)मता अिभवृि(cid:23) क(cid:25) गणना क(cid:25) गई ह।ै तQप )च ात् अलग-अलग मौसम म(cid:17) मांग संबंधी घट-बढ़ के िलए भी पवू ा2नुमान (पीक और ऑफ पीक) लगाए गए ह O ता4क यह सुिनिcत 4कया जा सके 4क अिधकतम (cid:18)मता अिभवृि(cid:23) से सभी मौसम* म(cid:17) मांग को पूरा 4कया जा सके। ------------++++++++++++------------80 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] अअअअननननबबुुबबुु धधंंधधंं 3333....1111 अअअअििििखखखखलललल भभभभााााररररततततीीीीयययय औऔऔऔरररर रररराााा3333यय यय ववववाााारररर////ससससघघंंघघंं रररराााा3333यय यय ववववाााारररर पपपपववूूववूू ाााानन(cid:4)(cid:4)नन(cid:4)(cid:4) ममममुुुु ाााानननन पपपपााााववववरररर ;;;;टट टट ेेशशेेशशनननन बबबबससससववववाााारररर पपपपरररर पपपपीीीीकककक ििििववववKKKKततुुततुु भभभभाााारररर ((((ककककेेेेववववलललल ििििववववKKKKततततुुुु ककककंंंंपपपपििििननननययययाााा))ंं))ंं ((((यययय//ूू//ूूआआआआरररर)))) ससससेेेे 2222000011112222----11113333 2222000022221111----22222222 ममममगगेेगगेे ााााववववााााटटटट मममम(cid:16)(cid:16)(cid:16)(cid:16) 11112222वववव(cid:18)(cid:18)(cid:18)(cid:18) ययययोोोोजजजजननननाााा 11113333वववव(cid:18)(cid:18)(cid:18)(cid:18) ययययोोोोजजजजननननाााा रररराााा(cid:22)(cid:22)(cid:22)(cid:22)यययय ////ससससघघघघंंंं रररराााा(cid:22)(cid:22)(cid:22)(cid:22)यययय 2222000011112222----11113333 2222000011113333----11114444 2222000011114444----11115555 2222000011115555----11116666 2222000011116666----11117777 2222000011117777----11118888 2222000011118888----11119999 2222000011119999----22220000 2222000022220000----22221111 2222000022221111----22222222 (cid:1)द(cid:3)ल ी 5290 5547 5818 6101 6398 6849 7335 7857 8419 9024 ह(cid:8)रयाणा 7291 7944 8655 9429 10273 11006 11749 12526 13356 14244 िहमाचल (cid:16)देश 1459 1558 1665 1778 1900 2022 2151 2288 2434 2589 ज(cid:20)म ू और क(cid:24) मीर 2471 2523 2577 2631 2687 2917 3180 3481 3825 4217 पंजाब 10292 10770 11271 11794 12342 12826 13228 13648 14089 14552 राज(cid:25)थ ान 9396 10360 11422 12594 13886 14957 16004 17137 18364 19692 उ(cid:28) तर पदेश 14152 15993 18073 20424 23081 25547 27832 30331 33067 36061 उ(cid:28) तराखंड 1716 1824 1938 2060 2189 2315 2449 2591 2741 2901 चंडीगढ़ 352 370 387 406 426 450 475 501 529 559 उउउउ(cid:12)(cid:12)(cid:12)(cid:12)तततत ररररीीीी (cid:27)(cid:27)(cid:27)(cid:27)(cid:29)(cid:29)(cid:29)(cid:29)ेेेे 44444444000033333333 44447777777755558888 55551111777799999999 55556666111188881111 66660000999933334444 66665555666688886666 77770000222277776666 77775555222233338888 88880000666622220000 88886666444466661111 गोआ 622 666 712 762 815 880 949 1024 1105 1191 गुजरात 13047 14350 15782 17358 19091 20486 21942 23503 25177 26973 छ(cid:28) तीसगढ़ 3534 3792 4070 4367 4687 5028 5385 5755 6162 6599 म(cid:31) य (cid:16)देश 10299 11102 11967 12899 13904 14934 15803 16734 17732 18802 महारा ! 22368 23795 25313 26928 28645 29983 32122 34431 36926 39622 दादर और नागर हवेली 693 749 809 874 944 1006 1072 1142 1217 1297 दमन और दीव 380 394 409 425 441 469 500 533 567 605 पपपपिििि(cid:3)(cid:3)(cid:3)(cid:3)ममममीीीी (cid:6)(cid:6)(cid:6)(cid:6)(cid:8)(cid:8)(cid:8)(cid:8)ेेेे 44446666999900009999 55550000333300000000 55553333999933336666 55557777888833335555 66662222000011115555 66665555888877771111 77770000333388883333 77775555222222223333 88880000444444441111 88886666000055554444 आं(cid:3) (cid:5)देश 15553 17044 18681 20476 22445 24271 26246 28382 30693 33194 कना#टक 9742 10473 11258 12102 13010 13964 14945 16005 17159 18403 केरल 3701 3922 4157 4405 4669 4931 5198 5479 5777 6093 तिमलनाडु 14174 15736 17497 19489 20816 22375 24057 25876 27838 29975 पुदचु ेरी 533 555 579 604 630 659 690 722 754 782 ददददिििि(cid:27)(cid:27)(cid:27)(cid:27)णणणणीीीी (cid:27)(cid:27)(cid:27)(cid:27)(cid:29)(cid:29)(cid:29)(cid:29)ेेेे 33339999888855550000 44443333666622223333 44447777777755552222 55552222222277773333 55557777222222221111 66661111555522225555 66666666111111111111 77771111000066663333 77776666444411113333 88882222111199999999 िबहार 2843 3277 3777 4354 5018 5660 6398 7250 8236 9306 झारखंड 3452 3727 4010 4301 4616 4948 5262 5598 5957 6341 उड़ीसा 4397 4686 4994 5322 5672 5866 6066 6289 6515 6749 पि&म बंगाल 8289 9052 9887 10798 11793 12882 13964 15124 16369 17703 िस(cid:1)+म 117 123 130 137 144 148 159 164 170 176¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 81 11112222वववव(cid:18)(cid:18)(cid:18)(cid:18) ययययोोोोजजजजननननाााा 11113333वववव(cid:18)(cid:18)(cid:18)(cid:18) ययययोोोोजजजजननननाााा रररराााा(cid:22)(cid:22)(cid:22)(cid:22)यययय ////ससससघघघघंंंं रररराााा(cid:22)(cid:22)(cid:22)(cid:22)यययय 2222000011112222----11113333 2222000011113333----11114444 2222000011114444----11115555 2222000011115555----11116666 2222000011116666----11117777 2222000011117777----11118888 2222000011118888----11119999 2222000011119999----22220000 2222000022220000----22221111 2222000022221111----22222222 पपपपववूूववूू """" (cid:27)(cid:27)(cid:27)(cid:27)(cid:29)(cid:29)(cid:29)(cid:29)ेेेे 11116666666633338888 11118888222299991111 22220000111100009999 22222222111100006666 22224444333300003333 22226666333322220000 22228888444411111111 33330000777711110000 33333333222222226666 33335555999922228888 असम 1300 1414 1537 1671 1817 1946 2080 2222 2373 2534 मिणपुर 180 212 249 294 346 373 399 428 460 497 मेघालय 338 362 388 415 445 475 505 529 551 596 नागाल,ड 145 154 164 174 185 201 216 233 251 271 ि-पुरा 254 274 294 317 340 365 389 415 442 472 अ0णाचल (cid:16)देश 111 117 123 129 135 142 150 158 167 177 िमजोरम 174 197 223 252 285 302 314 325 338 352 पपपपववूूववूू ####(cid:12)(cid:12)(cid:12)(cid:12)तततत रररर (cid:27)(cid:27)(cid:27)(cid:27)(cid:29)(cid:29)(cid:29)(cid:29)ेेेे 2222222211114444 2222333388882222 2222555566663333 2222777755557777 2222999966666666 3333111166669999 3333333377770000 3333555577779999 3333888800000000 4444000055556666 अंडमान और िनकोबार 59 61 63 65 67 71 75 79 84 89 ल12ीप 8 9 10 10 11 12 14 15 16 18 अअअअििििखखखखलललल भभभभााााररररतततत 111144443333999966667777 111155556666222200008888 111166669999444499991111 111188883333999900002222 111199999999555544440000 222211114444000099993333 222222229999444466665555 222244446666000066668888 222266664444000044441111 222288883333444477770000 अअअअििििखखखखलललल भभभभााााररररततततीीीीयययय औऔऔऔरररर रररराााा3333यय यय ववववाााारररर////ससससघघंंघघंं रररराााा3333यय यय ववववाााारररर पपपपववूूववूू ाााानन(cid:4)(cid:4)नन(cid:4)(cid:4) ममममुुुु ाााानननन पपपपााााववववरररर ;;;;टट टट ेेशशेेशशनननन बबबबससससववववाााारररर पपपपरररर ििििववववKKKKततुुततुु ऊऊऊऊजजजजाााा (cid:4)(cid:4) (cid:4)(cid:4)आआआआवववव>>>>यय यय ककककतततताााा ((((ककककेेेेववववलललल ििििववववKKKKततततुुुु ककककंंंंपपपपििििननननययययाााा))ंं))ंं ((((यययय//ूू//ूूआआआआरररर)))) ससससेेेे 2222000011112222----11113333 2222000022221111----22222222 ििििममममििििललललययययनननन ययययििूूििूू ननननटटटट मममम(cid:16)(cid:16)(cid:16)(cid:16) 11112222वववव(cid:18)(cid:18)(cid:18)(cid:18) ययययोोोोजजजजननननाााा 11113333वववव(cid:18)(cid:18)(cid:18)(cid:18) ययययोोोोजजजजननननाााा रररराााा(cid:22)(cid:22)(cid:22)(cid:22)यययय ////ससससघघघघंंंं रररराााा(cid:22)(cid:22)(cid:22)(cid:22)यययय 2222000011112222----11113333 2222000011113333----11114444 2222000011114444----11115555 2222000011115555----11116666 2222000011116666----11117777 1111000011117777----11118888 2222000011118888----11119999 2222000011119999----22220000 2222000022220000----22221111 2222000022221111----22222222 (cid:1)द(cid:3)ल ी 29100 31011 33047 35217 37529 40176 43023 46085 49382 52930 ह(cid:8)रयाणा 40750 44254 48060 52193 56681 60725 64820 69108 73688 78586 िहमाचल (cid:16)देश 8974 9421 9891 10384 10901 11546 12228 12948 13710 14514 ज(cid:20)म ू और क(cid:24) मीर 14425 14872 15333 15808 16298 17180 18172 19282 20516 21884 पंजाब 51595 55567 59844 64450 69410 73032 76245 79626 83186 86941 राज(cid:25)थ ान 54243 59382 65007 71166 77907 83914 89792 96149 103030 110483 उ(cid:28) तर पदेश 93148 102924 113727 125664 138854 152571 164997 178488 193136 209046 उ(cid:28) तराखंड 10735 11207 11700 12214 12751 13466 14223 15025 15874 16774 चंडीगढ़ 1767 1859 1956 2058 2165 2286 2414 2549 2692 2842 उउउउ(cid:12)(cid:12)(cid:12)(cid:12)तततत ररररीीीी (cid:27)(cid:27)(cid:27)(cid:27)(cid:29)(cid:29)(cid:29)(cid:29)ेेेे 333300004444777733337777 333333330000444499997777 333355558888555566665555 333388889999111155553333 444422222222444499998888 444455554444888899997777 444488885555999911114444 555511119999222266660000 555555555555222211114444 555599994444000000000000 गोआ 3641 3912 4204 4517 4853 5205 5572 5966 6386 6837 गुजरात 82331 88254 94603 101409 108704 116649 124937 133825 143360 153582 छ(cid:28) तीसगढ़ 17703 19146 20707 22396 24222 25989 27833 29743 31850 3410682 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 11112222वववव(cid:18)(cid:18)(cid:18)(cid:18) ययययोोोोजजजजननननाााा 11113333वववव(cid:18)(cid:18)(cid:18)(cid:18) ययययोोोोजजजजननननाााा रररराााा(cid:22)(cid:22)(cid:22)(cid:22)यययय ////ससससघघघघंंंं रररराााा(cid:22)(cid:22)(cid:22)(cid:22)यययय 2222000011112222----11113333 2222000011113333----11114444 2222000011114444----11115555 2222000011115555----11116666 2222000011116666----11117777 1111000011117777----11118888 2222000011118888----11119999 2222000011119999----22220000 2222000022220000----22221111 2222000022221111----22222222 म(cid:31) य (cid:16)देश 56763 61448 66519 72010 77953 83988 89152 94699 100657 107060 महारा ! 140736 147402 154383 161695 169353 175870 187034 199001 211836 225606 दादर और नागर हवेली 4977 5276 5593 5930 6286 6665 7064 7488 7937 8413 दमन और दीव 2375 2479 2587 2700 2817 2976 3143 3320 3508 3706 पपपपिििि$$$$ममममीीीी (cid:27)(cid:27)(cid:27)(cid:27)(cid:29)(cid:29)(cid:29)(cid:29)ेेेे 333300008888555522227777 333322227777999911117777 333344448888555599997777 333377770000666655555555 333399994444111188888888 444411117777333344442222 444444444444777733335555 444477774444000044442222 555500005555555533334444 555533339999333311110000 आं4 (cid:16)देश 93189 101231 109968 119458 129767 140324 151743 164093 177454 191912 कना#टक 58513 63001 67833 73036 78637 83917 89285 95059 101309 108012 केरल 20516 21889 23354 24917 26584 28080 29595 31198 32895 34691 तिमलनाडु 91625 97865 104529 111648 119251 128177 137815 148237 159475 171718 पुदचु ेरी 3024 3155 3293 3436 3586 3755 3929 4109 4295 4452 ददददिििि(cid:27)(cid:27)(cid:27)(cid:27)णणणणीीीी (cid:27)(cid:27)(cid:27)(cid:27)(cid:29)(cid:29)(cid:29)(cid:29)ेेेे 222266666666888866667777 222288887777111144441111 333300008888999977777777 333333332222444499995555 333355557777888822226666 333388884444222255552222 444411112222333366667777 444444442222666699996666 444477775555444422226666 555511110000777788886666 िबहार 16529 19096 22062 25489 29447 32964 36982 41590 46883 52975 झारखंड 21309 22844 24407 25990 27691 29592 31381 33287 35318 37482 उड़ीसा 26265 28374 30652 33113 35772 36999 38262 39667 41089 42566 पि&म बंगाल 51021 55288 59912 64923 70352 76511 82571 89033 95927 103283 िस(cid:1)+म 440 461 482 504 528 544 581 601 622 645 पपपपववूूववूू """" (cid:27)(cid:27)(cid:27)(cid:27)(cid:29)(cid:29)(cid:29)(cid:29)ेेेे 111111115555555566664444 111122226666000066663333 111133337777555511115555 111155550000000011118888 111166663333777799990000 111177776666666611111111 111188889999777777777777 222200004444111177778888 222211119999888833339999 222233336666999955552222 असम 6392 6953 7562 8225 8947 9615 10313 11058 11852 12699 मिणपुर 737 840 956 1089 1241 1405 1571 1760 1975 2219 मेघालय 1749 1861 1981 2108 2243 2396 2553 2678 2794 3029 नागाल,ड 692 725 760 796 834 895 954 1019 1088 1163 ि-पुरा 1029 1112 1201 1297 1401 1514 1628 1751 1883 2026 अ0णाचल (cid:16)देश 524 531 538 545 552 580 611 644 681 721 िमजोरम 503 588 686 801 936 1031 1112 1196 1287 1388 पपपपववूूववूू ####(cid:12)(cid:12)(cid:12)(cid:12)तततत रररर (cid:27)(cid:27)(cid:27)(cid:27)(cid:29)(cid:29)(cid:29)ेे(cid:29)ेे 11111111666622228888 11112222666600009999 11113333666688884444 11114444888866662222 11116666111155554444 11117777444433335555 11118888777744443333 22220000111100006666 22221111555566660000 22223333222244444444 अंडमान और िनकोबार 328 337 347 356 366 390 415 443 473 505 ल12ीप 43 45 47 49 52 55 57 59 62 65 अअअअििििखखखखलललल भभभभााााररररतततत 1111000000007777666699994444 1111000088884444666611110000 1111111166667777777733331111 1111222255557777555588889999 1111333355554444888877774444 1111444455550000999988882222 1111555555552222000000008888 1111666666660000777788883333 1111777777778888111100009999 (cid:17)(cid:17)(cid:17)(cid:17)(cid:20)(cid:20)(cid:20)(cid:20)(cid:21)(cid:21)(cid:21)(cid:21)(cid:22)(cid:22)(cid:22)(cid:22)(cid:18)(cid:18)(cid:18)(cid:18)(cid:23)(cid:23)(cid:23)(cid:23)(cid:17)(cid:17)(cid:17)(cid:17)(cid:4)(cid:4)(cid:4)(cid:4)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 83 अअअअ((((यय यय ाााायययय 4444 AAAAीीीीननननहहहहााााउउउउसससस गगगगससैैससैै ((((जजजजीीीीएएएएचचचचजजजजीीीी)))) उउउउपपपपशशशशममममनननन ककककेेेे ििििललललएएएए (cid:1)(cid:1)(cid:1)(cid:1)ययययाााासससस औऔऔऔरररर उउउउपपपपाााायययय 4444....0000 (cid:1)(cid:1)(cid:1)(cid:1)(cid:2)(cid:2)(cid:2)(cid:2)तत तत ााााववववननननाााा मानव – जिनत जलवाय ु प3रवत2न वैि]क िवकास <यास* के िलए काफ(cid:25) खतरा पैदा कर रहा ह।ै इसिलए मानव जिनत जलवायु प3रवत2न के उपशमन और Cय ूनीकरण के वैि]क <यास भारत के रा!" ीय िहत के अनNु प ह।O बृहQत अथ2Kय व8थ ा पैमाने पर भारत म(cid:17) काब2न डाईऑdस ाइड (सीओ2) सबसे कम होती ह ै जो िव)व म(cid:17) <ित Kय िA CO2 उQस जन2 * से सबस े कम ह,ै िव)व म (cid:17) औसतन <ित Kय िA 4.29 मी3"क टन क(cid:25) तलु ना म (cid:17) भारत म (cid:17) <ित Kय िA लगभग 1.37 मी3"क टन (qोत – आईईए िव) व ऊजा2 सांिZयक(cid:25)) और संयुdत राoय अमे3रका म(cid:17) <ित Kय िA जीडीपी (जीडीपी के सीओ2 उQस ज2न टन म(cid:17)) के संबंध म(cid:17) अCय अथ2Kय व8थ ाE क(cid:25) तुलना म(cid:17) भारत का िन!प ादन भी ब,त अzछ ा रहा ह।ै 1992 के यूएनएफसीसी कCव (cid:17)शन पर ह8त ा(cid:18)र करके भारत जलवायु प3रवत2न के िलए ‘‘साझा ले4कन अलग–अलग दाियQव ’’ के िस(cid:23)ातं क(cid:25) पुि~ करता ह।ै सरकार क(cid:25) एक(cid:25)कृत ऊजा2 नीित 3रपोट2 म(cid:17) <8त ािवत पहल और योजनाE म(cid:17) सीओ2 क(cid:25) सघनता म(cid:17) िगरावट होना 4दखाया गया ह ै जब4क तेजी स े बढ़ रही अथ2Kय व8थ ा क(cid:25) मांग को पूरा करन े के िलए \ामीण प,चं का Kय ापक िव8त ार और िव#तु उQप ादन म(cid:17) वृि(cid:23) हो रही ह।ै भारत को ऐसे नीितपरक िवकjप * का आकलन और िवकास करने क(cid:25) आव)य कता ह ै िजनसे अित3रdत िनवेश और <ौ#ोिगक ह8त ांतरण को सिु वधाजनक बनाकर इसके िवकास और वृि(cid:23) के साथ समझौता 4कए िबना जलवायु प3रवत2न स े संबंिधत JचताE का समाधान होता ह।ै भारत के पास अपने िवकासपथ म(cid:17) काब2न सघनता को िनयंिRत करते ,ए िवकास म(cid:17) तेजी लाने के पया2=त अवसर ह।O इसे िव#तु (cid:18)मता के सजृ न म(cid:17) सुधार करके, िव#ुत (cid:18)Rे म(cid:17) तकनीक(cid:25) (cid:18)ित को कम करके िविभCन (cid:18)ेR* म(cid:17) ऊजा 2 (cid:18)मता को बढ़ाकर, जल िव#ुत और नवीकरणीय सभं ाKय ता का िवकास करके तथा नई <ौ#ोिग4कय* को अिधकािधक अपनाकर ''Cय ून काब2न’’ और आPथक िन!प ादन के बीच पया2=त सामंज8य बनाकर <ा=त 4कया जा सकता ह।ै इसके अलावा ऐस े कई और िवकास फायद े ह O िजCह (cid:17) भारत बेहतर Nप स े तैयार Cय ून काब2न रणनीित िजसम(cid:17) ऊजा2 सुर(cid:18)ा, िवत3रत नवीकरणीय अनु<योग* तथा शहर* और घर* म(cid:17) 8व zछ वायु के ज3रए \ामीण प,चं के साथ <ा=त कर सकता ह।ै सं(cid:18)ेप म (cid:17) Cय ून काब2न िवकास रणनीित 8व ा8(cid:129) य सुधार, उQप ादकता और जीवन गुणवQत ा के िलए एक अवसर हो सकता ह।ै जलवायु प3रवत2न पर रा!" ीय काय2 योजना (एनएपीसीसी) म(cid:17) जलवायु प3रवत2न से िनपटने के िलए भारत क(cid:25) रणनीित और भारत के िवकासपथ क(cid:25) पा3रि8थितक(cid:25)य ि8थरता बढ़ाने का वण2न 4कया गया ह।ै जलवाय ु प3रवत2न के संदभ2 म(cid:17) मुZय ल%य <ा=त करने के िलए ब,-आयामी, दीघ2कालीन और एक(cid:25)कृत रणनीितय* स े आठ रा!" ीय िमशन रा!" ीय काय2 योजना का कोर बनता ह,ै िजनम(cid:17) से दो रा!" ीय सौर िमशन और बढ़ी ,ई ऊजा2 (cid:18)मता पर िमशन ह।O िव#ुत उQप ादन के िलए nधन का िवकjप जीएचजी के उपशमन के िलए एक मुZय कारक ह।ै अनुकूल qोत होने के कारण नवीकरणीय ऊजा2 qोत को यथासंभव <ोQस ािहत 4कया जा रहा ह।ै पारंप3रक qोत* के मामले म(cid:17) जल और आणिवक िवकjप ह।O िव#तु उQप ादन के िलए गैस को कोयले और िल‚न ाइट से अzछ ा माना जाता ह।ै कोयला आधा3रत सजृ न के मामले म (cid:17) उzच (cid:18)मता के <ौ#ोिगक(cid:25) िवकjप * को बढ़ावा 4दया जा रहा ह ै dय *4क (cid:18)मता और काब2न उQस जन2न के म(cid:2)य एक िवपरीत सह संबंध ह।ै िविभCन <कार के िव#ुत संयंR* के िलए काबन2 डाईआdस ाइड (CO2) उQस ज2न का िववरण िनbन िलिखत ह ै :84 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] िव#ुत संयंR का <कार िविश!ट CO 2 उQस ज2न टी CO 2 / एमडIj य ूएच कोयला 1.04 िल‚न ाइट 1.28 गैसी – सीसी 0.43 गैस – ओसी 0.66 गैस इंजन (केवल िव#तु ) 0.46 गैस इंजन (सीएचपी) 0.22 तेल 0.66 डीजल इंजन 0.59 डीजल ओसी 0.69 ना|ता 0.61 हाइrो 0 आणिवक 0 पवन 0 सौर 0 (cid:18)मता म(cid:17) सुधार को छोड़कर इसके आिव!क ार स े लेकर मलू भूत िव#तु उQप ादन <ौ#ोिगक(cid:25) म(cid:17) कोई बड़ा प3रवत2न नह(cid:7) ,आ ह।ै आज भी कोयल े क(cid:25) तापन ऊजा2 क(cid:25) काफ(cid:25) माRा िव#ुत उQप ादन <4Bया म(cid:17) न!ट हो जाती ह।ै िव#तु क(cid:25) बढ़ती ,ई आव)य कता को पूरा करने के िलए बड़ े <ौ#ोिगक(cid:25)य नवोदभव करने ह*गे ता4क जीवा)म nधन स े अिधकतम ऊजा 2 उपलIध हो सके। इस <कार पया2वरणीय अवBमण क(cid:25) सम8य ा से िनपटने के िलए इंजीिनयर* और तकनीिशयन* के सbम ुख एक चुनौती होगी। ताप िव#ुत केCf * के सbम ुख दसू री सम8य ा कोयले म(cid:17) राख का अनुपात और उQस ज2न के संबधं म(cid:17) कठोर पया2वरणीय मानक* क(cid:25) ह।ै आज थम2ल सृजन काब2न डाईआdस ाइड, काब2न मोनोऑdस ाइड (एसओएdस ) के उQस ज2न के ज3रए वातावरणीय <दषू ण हो रहा ह।ै जीएचजी को कम करने के िलए नई <ौ#ोिगक(cid:25) िवकिसत करनी होगी। यह पूरे िव)व म(cid:17) इंजीिनयर* और <ौ#ोिगक(cid:25)िवद* के सामने एक बड़ी चुनौती ह।ै 4444....1111 उउउउNNNNपप पप ााााददददनननन सससस ेे ेेककककााााबबबबनन(cid:22)(cid:22)नन(cid:22)(cid:22) उउउउNNNNसससस जजजजनन(cid:22)(cid:22)नन(cid:22)(cid:22) –––– ववववततततमम(cid:22)(cid:22)मम(cid:22)(cid:22) ाााानननन िििि(cid:2)(cid:2)(cid:2)(cid:2)थथथथिििितततत आईईए ऊजा2 सांिZयक(cid:25) – 2011 क(cid:25) 3रपोट2 के अनुसार भारत क(cid:25) <ित Kय िA काब2न डाईआdस ाइड उQस ज2न क(cid:25) माRा <ित Kय िA केवल 1.37 टन ह ै जो िव)व म(cid:17) Cय ूनतम म(cid:17) से ह।ै िव)व म(cid:17) <ित Kय िA काब2न डाईआdस ाइड उQस ज2न लगभग 4.29 टन के लगभग ह ै और अमे3रका म(cid:17) सबसे अिधक 16.9 टन ह।ै िवश् व म(cid:17) भारत कुल सीओ2 उQस ज2न का लगभग उQस जन2 करता ह।ै अdट ूबर,,,, 2012 के अंत तक भारत क(cid:25) 8थ ािपत उQप ादन (cid:18)मता लगभग 2,,,,09,,,,276 मेगावाट ह।ै ताप सृजन पर 8थ ािपत (cid:18)मता लगभग 67% ह,,ै,, िजसम(cid:17) से कोयले का योगदान 85% ह।ै¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 85 नीचे तािलका 4.1 म(cid:17) दशे के पांच (cid:18)ेRीय ि\ड* म(cid:17) जीवा)म nधन िव#ुत केCf * के िलए भा3रत औसत िविश!ट उQस ज2न दशा2ए गए ह।O यह 8प !ट ह ै 4क िविभCन जीवा)म nधन* म(cid:17) से कोयले और िल‚न ाइट सबसे अिधक उQस ज2न दर (टीसीओ2/एमडIj य ूएच) ह।ै ततततााााििििललललककककाााा 4444....1111 ििििववववNNNNतत तत ववववषषषष (cid:22)(cid:22) (cid:22)(cid:22)2222000011110000----11111111 मममम $$ $$जजजजीीीीववववााााYYYYमम म म SSSSधधधधनननन फफफफााााययययडडडड (cid:22)(cid:22) (cid:22)(cid:22)(cid:2)(cid:2)(cid:2)(cid:2)टट टट ेेेेशशशशनननन'''' ककककेेेे ििििललललएएएए भभभभाााा////ररररतततत औऔऔऔससससतततत ििििववववििििशशशशUUUUटट टट उउउउNNNNसस सस जजजजनन(cid:22)(cid:22)नन(cid:22)(cid:22) ((((आआआआककंंककंं ड़ड़ड़ड़ ेे ेे –––– टटटटनननन ससससीीीीओओओओ2222////एएएएममममडडडड;;;;++ ++ यय यय एएूूएएूू चचचच मममम))$$))$$ ककककोोोोययययललललाााा डडडडीीीीजजजजलललल गगगगससैैससैै ििििललललHHHHनन नन ााााइइइइटटटट ननननाााा\\\\थथथथाााा ततततललेेललेे भभभभााााररररतततत 1.06 0.55 0.44 1.44 0.39 0.64 (सभी आंकड़ े िनवल उQप ादन पर आधा3रत ह)O यह उjल ेख 4कया जाता ह ै 4क 2008-09 से 2010-11 क(cid:25) अविध के दौरान भारत क(cid:25) सीओ2 उQस ज2न दर का Tख िनbन िलिखत तािलका और \ाफ म(cid:17) दशा2या गया ह ै । ततततााााििििललललककककाााा 4444....2222 भा3रत औसत उQस ज2न दर (टन सीओ2/एमडIj य ूएच)))) ((((आयात सिहत)))) 2222000000003333----00004444 2222000000004444----00005555 2222000000005555----00006666 2222000000006666----00007777 2222000000007777----00008888 2222000000008888----00009999 2222000000009999----11110000 2222000011110000----11111111 0.85 0.84 0.81 0.80 0.79 0.82 0.81 0.79 िचR 4444....1111 Weighted Average Emission Rate tCO2/Mwh 0.86 0.84 0.85 0.84 0.82 0.82 0.81 0.8 0.8 0.81 0.79 0.78 0.79 0.76 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 Year % Weighted Average Emission Rate tCO2/Mwh86 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 4444....2222 पहल/उपाय िव#ुत उQप ादन (cid:18)ेR के िवकास के िलए क(cid:25) जा रही बबबबड़ड़ड़ड़ीीीी पपपपहहहहलललल$$ $$ कोयला आधा3रत िव#तु 8ट ेशन* क(cid:25) (cid:18)मता बढ़ान े से संबंिधत ह।ै ये पहले िनbन ानुसार ह O : • उzच वा!प पैरामीटर* सिहत यूिनट आकार क(cid:25) वृि(cid:23) • <ौ#ोिगक(cid:25) िवकास – उzच यूिनट आकार और 8व zछ कोयला <ौ#ोिग4कयां अपनाना (cid:3) izfr'kr सुपर 4B3टकल <ौ#ोिगक(cid:25) - 2 =व ाइंट (cid:18)मता लाभ संभाKय ता (cid:3) अj" ा अित महQव पूण2 <ौ#ोिगक(cid:25) – 800 मेगावाट सुपर 4B3टकल से ऊपर 0000....77775555%%%% अित3रdत (cid:18)मता। (cid:3) एक(cid:25)कृत गैसी4फकेशन <ौ#ो िगक(cid:25) - 40-45% • आर एvड एम तथा पुराने िव#ुत 8ट ेशन* क(cid:25) आयु बढ़ाना – िनिधय* क(cid:25) कमी को दरू करने के िलए सीडीएम के लाभ का िव8त ार करना • ऊजा2 द(cid:18)ता सुधार • पुरानी अ(cid:18)म इकाइय* को हटाना • कोयला क(cid:25) गुणवQत ा म(cid:17) सुधार अअअअ>>>>यय यय उउउउपपपपाााायययय'''' म(cid:17) ये शािमल ह O : • टी एडं डी हािनय* म(cid:17) कमी लाना – 2006-2007 म(cid:17) अिखल भारतीय 8त र पर टी एvं ड डी हािनया ं 28.65% थ(cid:7)। इसे 15% तक लाने का उ()े य ह।ै • ऊजा2 के उपयोग म(cid:17) कुशलता बरतना • कोयला प3रवहन म(cid:17) कटौती के िलए िपटहडे 8ट ेशन* क(cid:25) 8थ ापना टी एडं डी हािनय* को कम करने स े होने वाले लाभ* के सबं ंध म(cid:17) योजना के वॉjय ूम-।। म(cid:17) चचा2 क(cid:25) जाएगी। 4444....2222....1111 उउउउ]]]]चच चच ततततरररर ववववााााUUUUपप पप पपपपररैैररैै ााााममममीीीीटटटटरररर'''' ककककेेेे ससससााााथथथथ इइइइककककााााईईईई आआआआककककाााारररर मममम $$ $$वववव ििृृि िृृ (cid:31)(cid:31)(cid:31)(cid:31) भारत म(cid:17) िव#तु (cid:18)ेR म(cid:17) िपछले कुछ दशक* म(cid:17) Qव 3रत <ौ#ोिगक(cid:25)य िवकास दखे ा गया। कोयला आधा3रत =ल ांट क(cid:25) सबसे बड़ी आकार वाली यूिनट जो 1950 के दशक म(cid:17) माR 30 मेगावाट (cid:18)मता वाली थी,,,, जो 60 के दशक म(cid:17) बढ़कर 60 मेगावाट तथा 70 के दशक म (cid:17) 110/120/140 मेगावाट हो गई। तQप )च ात 1977 म (cid:17) 200 मेगावाट रिशयन इकाई (एलएमजेड) िसतंबर,,,, 1977 म(cid:17) आरंभ क(cid:25) गई तथा 1983 म(cid:17) सीमस(cid:17) क(cid:25) केडIj य ू िडजाइन को आरंभ 4कया गया। 1984 म(cid:17) 500 मेगावाट (cid:18)मता वाली यूिनट आरंभ क(cid:25) गई। इकाई आकार म(cid:17) वृि(cid:23) वा!प पैरामीटर* (दाब एवं तापमान) तथा (cid:18)मता से संबंि धत थ(cid:7)। बढ़ी ,ई (cid:18)मता का आशय कम जीएचजी उQस जन2 स े ह।ै सुधरे पैरामीटर* और िविभCन इकाइय* क(cid:25) िडजाइन (cid:18)मता नीचे तािलका 4.3 म(cid:17) दशा2ई गई ह ै :¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 87 ततततााााििििललललककककाााा4444....3333 ििििववववििििभभभभ>>>>नन नन इइइइककककााााईईईई आआआआककककाााारररर औऔऔऔरररर ममममPPुुPPुु यय यय पपपपररैैररैै ााााममममीीीीटटटटरररर यूिनट आकार M/s. दाब MS/RH तापमान सकल िडजाइन द(cid:18)ता एमडIj य ू 3333ककककललललोोोोAAAAाााामममम/cm2 o C (%) 30-50 60 482 28.20 60-100 90 535 31.30 210 एलएमजेड 130 535/535 35.63 210 केडIj य ूयू 150 535/535 37.04 250 150 535/535 38.3 500 169 538/538 38.6 660 247 538/565 39.5 565/593 40.5 800 247 565/593 40.5 आज 210/250 मेगावाट और 500 मेगावाट भारतीय ऊजा2 उ#ोग क(cid:25) रीढ़ ह ै और कुल कोयला आधा3रत 8थ ािपत (cid:18)मता का 75% से अिधक ह।ै 11व(cid:7) योजना के दौरान 660 मेगावाट क(cid:25) 8 सुपर 4B3टकल इकाइय* और 800 मेगावाट क(cid:25) एक इकाई कुल 6080 मेगावाट वाली इकाइय* क(cid:25) 8थ ापना क(cid:25) गई। 12व(cid:7) योजना के दौरान यह योजना ह ै 4क सुपर 4B3टकल <ौ#ो िगक(cid:25) वाली 660 मेगावाट तथा 800 मगे ावाट के <तिशत म(cid:17) 13व(cid:7) योजना म(cid:17) और अिधक वृि(cid:23) होगी और 13व(cid:7) योजना के दौरान सभी कोयला आधा3रत (cid:18)मता केवल सुपर4B3टकल <ौ#ोिगक(cid:25) क(cid:25) होने क(cid:25) आशा ह।ै 1960 और 1970 के दशक* के आरंभ म (cid:17) <ाइम मूवस2 के तौर पर गैस टबा2इन का उपयोग करके िव)व म(cid:17) बड़ े पैमाने पर िव#ुत उQप ादन 4कया गया। ऐसा मूलNप से <ौ#ोिगक(cid:25) िवकास के कारण ,आ dय *4क नए और उQत म 4क8म के ताप सƒ एलॉय का िविनमा2ण ,आ,,,, िजसके फल8व Nप उzच तर फाय[रग तापमान ,आ और फल8व Nप उzच तर चB (cid:18)मताए ं िवकिसत ,ई। िविनमा2ण <ौ#ोिग4कय* के िवकास के आधार पर गैस टबा2इन (जीटीएस) आमतौर पर मानक आकार* म(cid:17) िविनPमत क(cid:25) जाती ह।O अब जीटीएस 250 मेगावाट र(cid:17)ज तक उपलIध ह।ै ओपन साइ4कल <चालन लगभग 35% क(cid:25) उQप ादन (cid:18)मता पैदा करते ह O और िमि}त साइ4कल मोड म(cid:17) लगभग 53% क(cid:25) (cid:18)मता सृिजत करते ह।O चूं4क गैस टबा2इन म(cid:17) 8व zछ nधन (<ाकृितक गैस,,,, एलएनजी,,,, िडि8टलेट तेल,,,, नाफता) का उपयोग 4कया जाता ह,,ै,, अत: जीटी आधा3रत संयंR िव#ुत उQप ादन के िलए पयाव2 रण के अिधक अनकु ूल ह।O (cid:18)मता वृि(cid:23) आव)य कताE के एक भाग क(cid:25) पूPत हते ु 12व(cid:7) योजना के दौरान और उसके बाद भी गैस आधा3रत संयंR* क(cid:25) 8थ ापना को बढ़ावा 4दए जाने क(cid:25) आव)य कता ह।ै तथािप,,,, गैस क(cid:25) उपलIध ता एक बड़ा मु(ा ह ै जो अिधकतम (cid:18)मता पर िव#मान गैस टबा2इन 8ट ेशन* के प3रचालन को <ितकूल Nप से <भािवत कर रहा ह।ै नए गैस आधा3रत िव#ुत संयंR* का िवकास दशे म(cid:17) <ाकृितक गैस क(cid:25) उपलIध ता पर आधा3रत होगा।88 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 4444....2222....2222 (cid:2)(cid:2)(cid:2)(cid:2)वव वव ]]]]छछ छछ ककककोोोोययययललललाााा (cid:1)(cid:1)(cid:1)(cid:1)ौौौौIIIIोोोोििििगगगग3333ककककयययय'''' कककक1111 शशशश__ुु__ुु आआआआतततत : ससससपपुुपपुु रररर3333```` // //टटटटककककलललल (cid:1)(cid:1)(cid:1)(cid:1)ौौौौIIIIोोोोििििगगगगकककक1111 कोल फायड 2 थम2ल जनरेशन क(cid:25) (cid:18)मता म(cid:17) और अिधक वृि(cid:23) करने के िलए सुपर4B3टकल <ौ#ोिगक(cid:25) क(cid:25) शुTआत क(cid:25) जा रही ह।ै धात-ु िवwान क(cid:25) <गित और अzछ े माल क(cid:25) उपलIध ता होने स े नाजुक िबCद Eु से परे उzच तर पैरामीटर* को अपनाने से सब-4B3टकल इकाइय* पर लगभग 2% का (cid:18)मता लाभ संभव ह ै िजससे सीओ2 एनओx और एसओ x के उQस ज2न* म(cid:17) कमी ,ई ह।ै अपनाए गए वा! प पैरामीटर* पर िनभ2र करते ,ए,,,, सुपर4B3टकल <ौ#ोिगक(cid:25) स े लगभग 4% कोयल े क(cid:25) बचत तथा परंपरागत सब -4B3टकल इकाइय* क(cid:25) तुलना म (cid:17) उQस ज2न* म(cid:17) समNप कमी हो सकती ह।ै केCf ीय,,,, राoय तथा िनजी (cid:18)ेR म(cid:17) पहले ही 660 मेगावाट तथा 800 मेगावाट क(cid:25) कई सुपर4B3टकल का िनमा2ण 4कया जा रहा ह ै तथा 660 मेगावाट क(cid:25) 8 सुपर4B3टकल इकाइय* तथा 800 मेगावाट क(cid:25) एक इकाई क(cid:25) 11व(cid:7) पंचवष(cid:12)य योजना के दौरान पहले ही 8थ ापना क(cid:25) जा चुक(cid:25) ह।ै दशे म(cid:17) <ारंिभक सुपर4B3टकल इकाइयां टबा2इन इनलेट म(cid:17) 246 4क\ा/सीएम,,,, 535/565 िड\ी से. के वा!प पैरामीटर* पर आधा3रत थ(cid:7),,,, ले4कन कुछ इकाइयां िजCह *ने िनमा2ण काय 2 हाल ही म(cid:17) शुN 4कया है,,,, ने 565/593 िड\ी स(cid:17). के उzच तम वा!प तापमान अपनाया ह।ै काया2िCवत क(cid:25) जा रही अj" ा मेगा प3रयोजनाE के िलए सुपर4B3टकल <ौ#ोिगक(cid:25) को अिनवाय2 बनाया गया ह।ै बीएचईएल ने Bमश: सुपर4B3टकल बॉयलर* और टब„ जेनरेटर* के िविनमा2ण के िलए पहले ही मैसस 2 आj8 ट म और सीम(cid:17)स के साथ सहयोग 4कया ह।ै 8व दशे ी िविनमा2ण (cid:18)मता बढ़ाने के उ()े य से भारत म(cid:17) उपकरण िविनमा2ण शुN करन े के िलए अंतरा2!" ीय िविनमा2ताE को आकPषत करने के िलए <यास 4कए गए ह।O इसके िलए एल एडं टी न े पहले ही भारत म (cid:17) सुपर 4B3टकल बॉयलर* और टबा2इन* के िविनमा2ण के िलए एमएचआई जापान के साथ जेवी कंपनी बनाई ह।ै भारत फोज-2 आj8 ट न, जेएसडIj य ू - तोिशबा थमेdस – बेबकॉक और जीबी इंड8" ीज – अंसाjड ो अCय संयुdत उ#म* क(cid:25) दशे म(cid:17) सुपर4B3टकल उपकरण* के िविनमा2ण के िलए 8 थापना क(cid:25) गई ह।ै एनटीपीसी और डीवीसी क(cid:25) िविभCन प3रयोजनाE के िलए 660 मेगावाट क(cid:25) ‚य ारह सुप3र4B3टकल इकाइय* का बjक ऑडर2 दने े का एक <8त ाव भारत सरकार ने अनुमो4दत 4कया ह।ै इस <8त ाव म(cid:17) दशे म(cid:17) सुपर4B3टकल इकाइय* का िनमा2ण करने वाले आपूPतकता2E क(cid:25) अिनवाय2 शतU क(cid:25) प3रकjप ना क(cid:25) गई ह।ै इससे 8व दशे ी िविनमा2ण शुN करने के िलए नए संयुdत उ#म* के िलए कुछ <ारंिभक आदशे िमलने सुिनिcत ह*गे। 660 मेगावाट क(cid:25) ऐसी 11 इकाइय* क(cid:25) 9 प3रयोजनाE के बjक ट(cid:17)ड[रग का आडर2 द े 4दया गया ह ै और शेष 2 प3रयोजनाE के िलए शी… ही आडर2 4दए जाने क(cid:25) आशा ह।ै 800 मेगावाट इकाइय* के िलए अिनवाय2 चरणब(cid:23) 8व दशे ी िविनमा2ण के साथ बjड ट(cid:17)ड[रग क(cid:25) <4कया चल रही है। सुपर4B3टकल संयंR* के िलए 8व दशे ी उQप ादन सुिवधाE क(cid:25) 8थ ापना करना और ऐसी इकाइय* के 8व दशे ी घटक* म(cid:17) वृि(cid:23) करने से भिव!य म(cid:17) उनक(cid:25) लागत म(cid:17) कभी आने क(cid:25) संभावना ह।ै आशा ह ै 4क 12व(cid:7) योजना के दौरान कुल कोयला आधा3रत (cid:18)मता वृि(cid:23) लगभग 69,,,,280 मगे ावाट होगी िजसम(cid:17) स े 24,,,,920 मेगावाट (36%) सुपर4B3टकल इकाइय* पर आधा3रत ह।ै अअअअ++++aa aa ाााा ससससपपुुपपुु रररर3333````////टटटटककककलललल (cid:1)(cid:1)(cid:1)(cid:1)ौौौौIIIIोोोोििििगगगगकककक1111 अj" ा सुपर4B3टकल <ौ#ोिगक(cid:25) का ऊजा2 600/600 िड\ी स(cid:17)टी\ेट के उzच तर वा!प तापमान को अपनाना ह।ै अj" ा–सुपर4B3टकल <ौ#ोिगक(cid:25) को जापान तथा कुछ यूरोपीय दशे * न े पहले ही अपना िलया ह।ै कहा जाता ह ै 4क चीन म(cid:17) कुछ अ#तन इकाइयां भी सुपर-4B3टकल <ौ#ोिगक(cid:25) पर आधा3रत ह।O वा!प तापमान को 700 िड\ी स(cid:17)टी\ेट करने के अंतरा2!" ीय <यास जारी ह O तथा िविभCन आर एडं डी काय2Bम* के ज3रए आव)य क <ौ#ोिगक(cid:25) िवकास 4कया जा रहा ह।ै 700 िड\ी स(cid:17)टी\ेट के संयंR* स े 50% से अिधक (cid:18)मता <ा=त हो सकती ह।ै भारतीय प3रद)ृ य म(cid:17) सुपर4B3टकल इकाइय* क(cid:25) अिधक (cid:18)मता 12व(cid:7) योजना के अंत तक होगी और सुपर4B3टकल इकाइय* क(cid:25) अिधक िविनमा2ण (cid:18)मता (cid:18)Rे म(cid:17) आने वाली बीएचईएल और जेवी कंपिनय* के ज3रए <ा=त क(cid:25) जाएगी। इस <कार, लगभग 600/600-620 िड\ी स(cid:17)टी\ेट के वा!प पैरामीटर* के साथ अj" ा-सुपर¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 89 4B3टकल <ौ#ोिगक(cid:25) को आरंभ करन े पर संगत तकनीक(cid:25) आPथक पर आधा3रत िविश! ट 8थ ल* के िलए िवचार 4कया जा सकेगा। इसके अलावा, नए जेवी के अंतरा2!" ीय पाट2नर अj" ा सुपर4B3टकल संयंR* के िविनमा2ता ह O और 13व(cid:7) योजना म(cid:17) भारत म(cid:17) इस <ौ#ोिगक(cid:25) को अनुबंिधत कर सकते ह।O ससससककककु(cid:22)ु(cid:22)ु(cid:22)ु(cid:22)ललललbbेेbbेे टटटटगगगग \\\\ललललडडुुडडुु ााााइइइइ8888डड डड बबबबडडेेडडेे ककककंंंं;;;;(cid:2)(cid:2) (cid:2)(cid:2) टट ट ट नननन ((((ससससीीीीएएएएफफफफबबबबीीीीससससीीीी)))) (cid:1)(cid:1)(cid:1)(cid:1)ौौौौIIIIोोोोििििगगगगकककक1111 उzच सjफ र 3रफाइनरी अवशेष, िल‚न ाइट आ4द के िलए भारत म(cid:17) सीएफबीसी <ौ#ोिगक(cid:25) को Bिमक Nप स े िनयोिजत 4कया गया ह।ै उzच सjफ र िल‚न ाइट को फाइ[रग के िलए 125 मेगावाट सीएफबीसी इकाइय* क(cid:25) 8थ ापना क(cid:25) गई ह।ै नेवेली िल‚न ाइट कॉप„रेशन अपनी एनएलसी टीपीएस-।। िव8त ार प3रयोजना के िलए 250 मेगावाट सीएफबीसी बॉयलर 8थ ािपत कर रहा ह।ै सीएफबीसी क(cid:25) पूरी तकनीक(cid:25) जानकारी और वािणिoयक <बंध (लाइस(cid:17)सी) दशे म(cid:17) मौजूद ह ै और 250 मेगावाट तक सीएफबीसी बॉयलर दशे म(cid:17) ही िनPमत 4कए जा रह े ह।O आआआआईईईईजजजजीीीीससससीीीी (cid:1)(cid:1)(cid:1)(cid:1)ौौौौIIIIोोोोििििगगगगकककक1111 आईजीसीसी (एक(cid:25)कृत गैसी4फकेशन कंबाइंड साइकल) गैसीफायर* म(cid:17) कोयले के गैसी4फकेशन के ज3रए िव#तु उQप ादन संबंिधत ह ै जहां साइनगैस पैदा क(cid:25) जाती ह ै िजसे सफाई के बाद िव#ुत उQप ादन के िलए टबा2इन कंबाइंड साइ4कल <णािलय* म(cid:17) <युd त 4कया जाता ह।ै इस समय अंतरा2!" ीय Nप से आईजीसीसी संयंR* क(cid:25) (cid:18)मता क(cid:25) तुलना सुपर4B3टकल संयंR* से क(cid:25) जाती ह ै ले4कन <ौ#ोिगक(cid:25) म(cid:17) परंपरागत पj वराइoड कोयला <ौ#ोिगक(cid:25) क(cid:25) बजाय उzच तर (cid:18)मता <ा=त करने क(cid:25) संभाKय ता ह।ै ब,त Cय ून ऐश कोयला या पे"ोिलयम आधा3रत nधन के िलए आईजीसीसी को अतं रा2!" ीय 8त र पर अपनाया गया ह।ै दशे म(cid:17) उपलIध Cय ून गैस और पे"ोिलयम आधा3रत nधन से हमारे <यास अिधकतर <ौ#ोिगक(cid:25) पर केिCf त ह O जो भारतीय उzच ऐश कोयला का उपयोग कर सकते ह।O उzच ऐश भारतीय कोयला का उपयोग करके िवकासशील आईजीसीसी <ौ#ोिगक(cid:25) म(cid:17) अंतरा2!" ीय सहयोग क(cid:25) मांग क(cid:25) जा रही ह,ै िजसका उपयोग इस समय हमारे थम2ल पावर 8ट ेशन* म(cid:17) िव#तु उQप ादन के िलए 4कया जा रहा ह।ै 8व दशे ी आईजीसीसी <ौ#ोिगक(cid:25) िवकिसत करने के िलए कार2वाई क(cid:25) जा रही ह।ै बीएचईएल भारतीय कोयले के गैसी4फकेशन पर अनसु ंधान कर रहा ह ै और 125 मेगावाट आईजीसीसी आधा3रत संयंR क(cid:25) 8थ ापना करने के िलए एपीईजीएनसीओ के साथ एक ifj.kkeksa समझौता wापन पर ह8त ा(cid:18)र 4कए ह।O तथािप, पूव2 म(cid:17) 4कए गए अ(cid:2)य यन* के से भारतीय कोयला क(cid:25) उzच ऐश माRा के कारण आईजीसीसी <ौ#ोिगक(cid:25) के साथ (cid:18)मता म(cid:17) 4कसी सुधार का संकेत नह(cid:7) िमलता ह।ै 4444....2222....3333 थथथथममममलल(cid:22)(cid:22)लल(cid:22)(cid:22) पपपपााााववववरररर (cid:2)(cid:2)(cid:2)(cid:2)टट टट ेेेेशशशशनननन'''' ककककाााा ननननववववीीीीननननीीीीककककररररणणणण एएएएवववव ंं ंंआआआआधधधधििुुििुु ननननकककक1111ककककररररणणणण बबबबककैैककैै AAAAााााउउउउंंंंडडडड िव#मान पुरान े िव#तु 8ट ेशन* का नवीकरण और आधुिनक(cid:25)करण (आर एडं एम) तथा उनक(cid:25) आयु बढ़ान े स े कम समयाविध म(cid:17) कम लागत पर अित3रdत िव#तु उQप ादन का अवसर िमलता ह।ै उQप ादन म(cid:17) सुधार के अलावा इससे पया2वरणीय उQस ज2न* का सुधार और उपलIध ता, सुर(cid:18)ा और िव)व सनीयता म (cid:17) भी सुधार होता ह।ै भारतीय िव#ुत (cid:18)ेR म(cid:17) नवीकरण और आधुिनक(cid:25)करण योजनाE के aारा काब2न डाईआdस ाइड उQस ज2न कम करने क(cid:25) Kय ापक संभाKय ता ह।ै सीडीएम के लाम* को िविभCन आर एडं एम योजनाE,,,, िवशेषकर ऊजा2 (cid:18)मता सुधार के िलए िनिधय* क(cid:25) कमी को दरू करन े के िलए <ा=त 4कया जा सकता ह ै dय *4क य े योजनाए ं काबन2 डाईआdस ाइड उQस ज2न* का उपशमन कर(cid:17)गी और जीवा)म nधन क(cid:25) बचत होगी। आर एडं एम काय2Bम को दशे म(cid:17) 163 थम2ल इकाइय* को शािमल करत े ,ए 34 ताप िव#ुत 8ट ेशन* के िलए एक केCf ीय <ायोिजत कायB2 म के Nप म (cid:17) 1984 म(cid:17) शुN 4कया गया था। इस काय2Bम को वष2 1992 म (cid:17) सफलतापूवक2 पूरा 4कया गया था और लगभग <ित वष2 10,000 एमयू अित3रdत उQप ादन <ा=त 4कया गया था। 44 ताप िव#ुत 8ट ेशन* के िलए चरण-।। आर एडं एम काय2Bम था। 1990-91 म(cid:17) शुN 4कया गया था। िव#ुत िवQत िनगम (पीएफसी) aारा आर एडं एम कायU के िलए राoय िव#तु बोडU को ऋण सहायता <दान क(cid:25) जानी90 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] थी। तथािप, िनिधयां उपलIध न होने तथा राoय िव#ुत बोडU (एसईबी) क(cid:25) खराब िवQत ीय ि8थित के कारण यह काय2Bम <गित नह(cid:7) कर सकता। आर एडं एम काय2Bम को 8व(cid:7), 9व(cid:7), 10व(cid:7) तथा 11व(cid:7) योजना अविधय* म(cid:17) लगातार काया2िCवत 4कया गया ले4कन िविभCन कारण* जैसे बंदी के िलए इकाइय* क(cid:25) अनुपलIध ता, माल क(cid:25) आपूPत म(cid:17) िवलंब, िनिधय* क(cid:25) कमी, आर एडं एम कायU को शुN करने के िलए एज(cid:17)िसय* क(cid:25) कमी आ4द जैसे िविभCन कारण* से 10व(cid:7) योजना के बाद सीिमत सफलता िमली। 4444....2222....3333....1111 11111111वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन आआआआरररर एएएएडडंंडडंं एएएएमममम////एएएएललललईईईई ककककाााायययय``(cid:22)(cid:22)``(cid:22)(cid:22) मममम ककककाााा गगगगठठठठनननन औऔऔऔरररर उउउउपपपपललललिििि;;;;धधधधययययाााा ंं ंं 11व(cid:7) योजना के दौरान कायB2 म का सार और अनंितम उपलिIध का सारांश नीचे तािलका म(cid:17) 4दया गया ह ै : एएएएललललईईईई////आआआआरररर एएएएccccडड डड एएएएमममम काय2Bम---- 11111111व(cid:7) योजना (2007-12) के दौरान उपलिIधयां ````....सससस..ंं..ंं ििििववववववववररररणणणण रररराााा8888यय यय (cid:26)(cid:26)(cid:26)(cid:26)KKेेKKेे ककककेेेे>>>>WW WW ीीीीयययय (cid:26)(cid:26)(cid:26)(cid:26)KKेेKKेे ककककुुुुलललल ((((रररराााा8888यय यय (cid:26)(cid:26)(cid:26)(cid:26)KKेेKKेे ++++ ककककेेेे>>>>WW WW ीीीीयययय (cid:26)(cid:26)(cid:26)(cid:26)KKेेKKेे )))) इइइइककककााााइइइइयययय'''' (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा इइइइककककााााइइइइयययय'''' (((((cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा इइइइककककााााइइइइयययय'''' (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा कककक1111 ससससPPंंPPंं यय यय ाााा ((((ममममगगेेगगेे ााााववववााााटटटट)))) कककक1111 ससससPPंंPPंं यय यय ाााा कककक1111 ससससPPंंPPंं यय यय ाााा ((((ममममगगेेगगेे ााााववववााााटटटट)))) ((((ममममगगेेगगेे ााााववववााााटटटट)))) 1111.... एलई काय2Bम (उपलिIध) 33 4524 20 2794 53 7777333311118888 (उपलिIध) 10 1024 3 267 13 1111222299991111 2222.... आर एvड एम (काय2Bम) 27 6015 49 12950 76 11118888999966665555 (उपलिIध) 20 4485 39 10370 59 11114444888855555555 ककककुुुुलललल ((((ककककाााायययय``(cid:22)(cid:22)``(cid:22)(cid:22) मममम)))) 66660000 11110000555533339999 66669999 11115555777744444444 111122229999 22226666222288883333 ((((उउउउपपपपललललिििि;;;;धधधध)))) 33330000 5555555500009999 44442222 11110000666633337777 77772222 11116666111144446666 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ििििललललएएएए ककककाााायययय``(cid:22)(cid:22)``(cid:22)(cid:22) मममम 12व(cid:7) योजना के अंतग2त कुल 12066 मेगावाट (cid:18)मता क(cid:25) 70 थम2ल इकाइय* के संबंध म(cid:17) उनक(cid:25) िमयाद बढ़ाने के काय2 क(cid:25) पहचान क(cid:25) गई। इसम(cid:17) राoय (cid:18)ेR से 38 इकाइयां (6820 मेगावाट) तथा केCf ीय (cid:18)ेR से 32 इकाइया ं (5246 मेगावाट) शािमल ह।O केCf ीय (cid:18)ेR क(cid:25) इन 32 इकाइय* म(cid:17) स े एनटीपीसी क(cid:25) 28 (4456 मेगावाट) तथा डीवीसी क(cid:25) 4 इकाइयां (840 मेगावाट) ह।O उपयु2dत के अलावा, 12व(cid:7) योजना के दौरान आर एडं एम 65¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 91 इकाइय* (261 मेगावाट) पर भी पहचान क(cid:25) गई, इनम(cid:17) से 37 इकाइयां (12,890 मेगावाट), एनटीपीसी से ह O और 8 इकाइयां (261 मेगावाट) एनईईपीसीओ से ह।O शेष 20 इकाइयां (4150 मेगावाट) राoय िव#ुत (cid:18)ेR से ह।O ततततााााििििललललककककाााा 4444....5555 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ((((2222000011112222----11117777)))) ककककेेेे ददददौौौौरररराााानननन थथथथममममलल(cid:22)(cid:22)लल(cid:22)(cid:22) इइइइककककााााइइइइयययय'''' ककककाााा आआआआरररर एएएएडडंंडडंं एएएएमममम/एएएएललललईईईई ककककाााायययय``(cid:22)(cid:22)``(cid:22)(cid:22) मममम (cid:9)(cid:9)(cid:9)(cid:9)....सससस...ंं.ंं ििििववववववववररररणणणण रररराााा(cid:12)(cid:12)(cid:12)(cid:12)यय यय (cid:6)(cid:6)(cid:6)(cid:6)(cid:8)(cid:8)(cid:8)(cid:8)ेेेे ककककेेेे(cid:16)(cid:16)(cid:16)(cid:16)(cid:17)(cid:17) (cid:17)(cid:17) ीीीीयययय (cid:6)(cid:6)(cid:6)(cid:6)(cid:8)(cid:8)(cid:8)(cid:8)ेेेे जजजजोोोोड़ड़ड़ड़ ((((रररराााा(cid:12)(cid:12)(cid:12)(cid:12)यययय (cid:6)(cid:6)(cid:6)(cid:6)(cid:8)(cid:8)(cid:8)(cid:8)ेेेे ++++ ककककेेेे(cid:16)(cid:16)(cid:16)(cid:16)(cid:17)(cid:17) (cid:17)(cid:17) ीीीीयययय (cid:6)(cid:6)(cid:6)(cid:6)(cid:8)(cid:8)(cid:8)(cid:8)ेेेे )))) इइइइककककााााइइइइयययय(cid:19)(cid:19)(cid:19)(cid:19) कककक(cid:20)(cid:20)(cid:20)(cid:20) (cid:6)(cid:6)(cid:6)(cid:6)ममममतततताााा इइइइककककााााइइइइयययय(cid:19)(cid:19)(cid:19)(cid:19) कककक(cid:20)(cid:20)(cid:20)(cid:20) (((((cid:6)(cid:6)(cid:6)(cid:6)ममममतततताााा इइइइककककााााइइइइयययय(cid:19)(cid:19)(cid:19)(cid:19) कककक(cid:20)(cid:20)(cid:20)(cid:20) (cid:6)(cid:6)(cid:6)(cid:6)ममममतततताााा सससस(cid:23)(cid:23)ंं(cid:23)(cid:23)ंं यययय ाााा ((((ममममगगेेगगेे ााााववववााााटटटट)))) सससस(cid:23)(cid:23)ंं(cid:23)(cid:23)ंं यययय ाााा सससस(cid:23)(cid:23)ंं(cid:23)(cid:23)ंं यययय ाााा ((((ममममगगेेगगेे ााााववववााााटटटट)))) ((((ममममगगेेगगेे ााााववववााााटटटट)))) 1111.... एलई काय(cid:15) 38 6820 32 5246 70 11112222000066666666 2222.... आर ए(cid:17) ड एम काय(cid:15) 20 4150 45 13151 65 11117777333300001111 एएएएललललईईईई आआआआरररर एएएए(cid:27)(cid:27)(cid:27)(cid:27)डडडड एएएएमममम 55558888 11110000999977770000 77777777 11118888333399997777 111133335555 22229999333366667777 ककककाााा जजजजोोोोड़ड़ड़ड़ 11112222व(cid:7) योजना के दौरान िमयाद बढ़ाने और आर एvड एम के िलए पहचानी गई इकाइय* क(cid:25) सूची Bमश: अनुबंध 4.1 और 4.2 म(cid:17) दी गई ह।ै 11113333 वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ((((2222000011117777----2222000022222222)))) ककककेेेे ददददौौौौरररराााानननन एएएएललललईईईई औऔऔऔरररर आआआआरररर एएएएडडंंडडंं एएएएमममम ककककेेेे ििििललललएएएए ससससभभंंभभंं ााााििििववववतततत ककककंंंंडडडडीीीीडडडडेटेटेटेट इइइइककककााााइइइइययययाााा ंं ंं 11113333 व(cid:7) योजना आर एडं एम/एलई काय2Bम (संभािवत कंडीडटे इकाइयां) ततततााााििििललललककककाााा 4444....6666 11113333वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा आआआआरररर एएएएडडंंडडंं एएएएमममम////एएएएललललईईईई ककककाााायययय``(cid:22)(cid:22)``(cid:22)(cid:22) मममम ((((ससससभभंंभभंं ााााििििववववतततत ककककंंंंडडडडीीीीडडडडटटेेटटेे इइइइककककााााइइइइययययाााांं))ं)ं) ककककाााायययय(cid:5)(cid:5)(cid:5)(cid:5)(cid:4)(cid:4)(cid:4)(cid:4) मममम ककककाााा ननननाााामममम रररराााा(cid:10)(cid:10)(cid:10)(cid:10)यययय (cid:11)(cid:11)(cid:11)(cid:11)(cid:13)(cid:13)(cid:13)(cid:13)ेेेे ककककेेेे(cid:14)(cid:14)(cid:14)(cid:14)(cid:15)(cid:15)(cid:15)(cid:15) ीीीीयययय (cid:11)(cid:11)(cid:11)(cid:11)(cid:13)(cid:13)(cid:13)(cid:13)ेेेे 11113333वववव(cid:18)(cid:18)(cid:18)(cid:18) ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन ककककुुुुलललल पपपपहहहहचचचचााााननननीीीी गगगगईईईई इइइइककककााााइइइइययययाााा ंं ंं((((रररराााा(cid:10)(cid:10)(cid:10)(cid:10)यययय ++++ ककककेेेे(cid:14)(cid:14)(cid:14)(cid:14)(cid:15)(cid:15)(cid:15)(cid:15) ीीीीयययय (cid:11)(cid:11)(cid:11)(cid:11)(cid:13)(cid:13)(cid:13)ेे(cid:13)ेे )))) इइइइककककााााइइइइयययय(cid:31)(cid:31)(cid:31)(cid:31) कककक (cid:11)(cid:11)(cid:11)(cid:11)ममममतततताााा इइइइककककााााइइइइयययय(cid:31)(cid:31)(cid:31)(cid:31) कककक (((((cid:11)(cid:11)(cid:11)(cid:11)ममममतततताााा इइइइककककााााइइइइयययय(cid:31)(cid:31)(cid:31)(cid:31) कककक (cid:11)(cid:11)(cid:11)(cid:11)ममममतततताााा ((((ममममगगेेगगेे ााााववववााााटटटट)))) सससस##ंं##ंं यययय ाााा ((((ममममगगेेगगेे ााााववववााााटटटट)))) सससस##ंं##ंं यययय ाााा सससस##ंं##ंं यययय ाााा ((((ममममगगेेगगेे ााााववववााााटटटट)))) एएएएललललईईईई ककककोोोोययययललललाााा 55 12130 16 3940 71 11116666000077770000 गगगगससैैससैै 6 672 5 765.71 11 1111444433338888 उउउउपपपपजजजजोोोोड़ड़ड़ड़ 66661111 11112222888800002222 22221111 4444777700006666 88882222 11117777555500008888 आआआआरररर एएएए((((डडडड एएएएमममम ककककोोोोययययललललाााा 16 3560 6 2420 22 5555999988880000 गगगगससैैससैै 6 1172 6 1111111177772222 उउउउपपपप जजजजोोोोड़ड़ड़ड़ 11116666 3333555566660000 11112222 3333555599992222 22228888 7777111155552222 ससससककककलललल जजजजोोोोड़ड़ड़ड़ 77777777 11116666333366662222 33333333 8888222299998888 111111110000 22224444666666660000 आआआआरररर एएएएडडंंडडंं एएएएमममम ककककाााायययय``(cid:22)(cid:22)``(cid:22)(cid:22) मममम ककककेेेे ििििललललएएएए भभभभााााववववीीीी ििििववववजजजजनननन अब तक आर एडं एम 4Bयाकलाप उनके प3रचालन को बनाए रखने, संयंR क(cid:25) उपलIध ता म(cid:17) सुधार और उनक(cid:25) प3रचालन अविध बढ़ाने के िलए पुरानी, छोटी आकार क(cid:25) इकाइय* तक सीिमत थ(cid:7)। तथािप, ऐसी इकाइयां ब, अ(cid:18)म थ(cid:7) और िविभCन प3रचालनाQम क सम8य ाE से \8त ह,O ऐसी इकाइय* को धीरे-धीरे बंद करने का उ()े य ह।ै92 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] आज 81% कोयला/िल‚न ाइट आधा3रत 8थ ािपत (cid:18)मता क(cid:25) 200/210/250 मगे ावाट तथा 500 मेगावाट इकाइयां (61655 मेगावाट) क(cid:25) इकाइयां भारतीय िव#तु (cid:18)ेR क(cid:25) रीढ़ ह।O 200/210 मेगावाट क(cid:25) अनेक मशीन (cid:17) और 500 मेगावाट क(cid:25) कुछ मशीन(cid:17) 15-25 वष2 या अिधक समय से प3रचालनरत ह।O (cid:18)मता एक(cid:25)कृत आर एडं एम के ज3रए ऐसी मशीन (cid:17) <ौ#ोिगक(cid:25) गहन आर एडं एम के ज3रए िन!प ादन बढ़ाने के िलए अzछ ा अवसर <दान करती ह।O (cid:18)मता एक(cid:25)कृत आर एडं एम/एलई योजना को प3रभािषत और काया2Cव यन हते ु संयंR िविश!ट ऊजा2 ऑिडट अ(cid:2)य यन करने का <8त ाव ह।ै इस समय तीन िव#ुत 8ट ेशन अथा2त बोकारो ‘बी’ टीपीएस (3X210 मेगावाट), कोलाघाट टीपीएस (3X210 मेगावाट) और नािसक टीपीएस इकाई-3 (1X210 मेगावाट) न े जम2न सरकार के िaप(cid:18)ीय सहयोग से (cid:18)मता एक(cid:25)कृत आर एडं एम अ(cid:2)य यन के िलए पहचान क(cid:25) ह।ै उपयु2dत सभी इकाइय* के िलए Kय वहाय2ता अ(cid:2)य यन तैयार करने हते ु सिं वदा दी गई ह।ै इसके अलावा, कुछ इकाइयां जैसे बंदले टीपीएस इकाई-5 (210 मगे ावाट) तथा कोराडी टीपीएस इकाई-। (210 मेगावाट) और पानीपत टीपीएस (2X110 मेगावाट) ने भी िव)व बOक सहायता के ज3रए (cid:18)मता एक(cid:25)कृत आर एडं एम के िलए पहचान क(cid:25) ह।ै बंदले टीपीएस इकाई-5 के िलए मुZय संयंR पैकेज हते ु मैसस2 दसु ान हवै ी इंड8" ी एडं कं8" dश न कंपनी िलिमटेड को एलओए जारी 4कया गया। कोराडी टीपीएस इकाई-6 के मामले म(cid:17) बोली <ा=त हो गई ह ै और इसका आकलन 4कया जा रहा ह।ै िव8त तृ अ(cid:2)य यन करने के प)च ात पानीपत टीपीएस क(cid:25) इकाई 3 एवं 4 क(cid:25) िमयाद बढ़ाने के िलए तकनीक(cid:25) आPथक Kय वहाय2ता 8थ ािपत नह(cid:7) का सक(cid:25) और एचपीजीसीएल बोड 2 ने इन इकाइय* म(cid:17) आर एडं एम काय2 नह(cid:7) करने का िनण2य िलया। बाƒ सहायता से ऊजा2 (cid:18)म आर एडं एम काय2Bम को कुछ इकाइय* म(cid:17) भी शुN करन े का इरादा ह।ै (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा ववववििृृििृृ (cid:31)(cid:31)(cid:31)(cid:31) औऔऔऔरररर एएएएडडंंडडंं एएएएमममम ककककेेेे ििििललललएएएए ििििववववYYYYवव वव बबबबककddककdd GGGGाााारररराााा ससससीीीीईईईईएएएए ककककोोोो ततततककककननननीीीीकककक1111 ससससहहहहााााययययतततताााा िव)व बOक भारत म(cid:17) ऊजा 2 (cid:18)म आर एडं एम म(cid:17) बाधाE को दरू करने के िलए कोल फायड 2 जनरेशन 3रहिै बिलटेशन प3रयोजना के अंतग2त सीईओ क(cid:25) जीईएफ अनुदान के भाग के तौर पर 1.1 िमिलयन अमरीक(cid:25) डालर क(cid:25) सहायता <दान कर रहा ह।ै भारत म(cid:17) आर एडं एम ह8त (cid:18)ेप क(cid:25) बाधाE को दरू करने, काया2Cव यन के िलए बाजार िवकिसत करने और आर एडं एम के (cid:18)ेR म(cid:17) सीईए क(cid:25) सं8थ ागत (cid:18)मता को सुदढ़ृ करने स े सबं ंिधत अ(cid:2)य यन करन े के िलए इस योजना को परामश2दाताE क(cid:25) िनयुिA के ज3रए काया2िCवत 4कया जाएगा। सभी परामश2दाताE क(cid:25) िनयुिA कर दी गई ह।ै 4444....2222....4444 हहहहााााइइइइ<<<<ोोोो इइइइललललििेेििेे 0000aaaaकककक पपपपााााववववरररर पपपप////ररररययययोोोोजजजजननननाााा???? ककककेेेे ििििललललएएएए ननननववववीीीीककककररररणणणण,,,, आआआआधधधधििुुििुु ननननकककक1111ककककररररणणणण औऔऔऔरररर अअअअIIIIततततननननीीीीककककररररणणणण िव#मान पुरानी हाइrो इलेिd"क पावर प3रयोजनाE का नवीकरण तथा आधुिनक(cid:25)करण और अविध बढ़ाने एव ं अपरे[टग करने (आर एम एडं यू) एक अzछ ा िवकjप माना जाता ह ै dय *4क इसम(cid:17) कम लागत आती ह ै और \ीन फ(cid:25)jड जल िव#ुत प3रयोजनाE क(cid:25) 8थ ापना करन े क(cid:25) बजाय शी… ल%य <ा=त 4कया जा सकता ह।ै जल िव#ुत उQप ादन बढ़ाने और िव#मान जल िव#ुत प3रयोजनाE क(cid:25) उपलIध ता म(cid:17) सुधार करन े के उ()े य स े भारत सरकार न े िव#मान इलेिd"क पावर प3रयोजनाE के आर एडं एम पर जोर 4दया ह।ै हाइrो इलेिd"क पावर प3रयोजनाE के लाभ को समझते ,ए भारत सरकार ने 1987 म(cid:17) एक रा!" ीय सिमित और 1998 म(cid:17) एक 8थ ायी सिमित ग3ठत क(cid:25)। तQप )च ात, इन सिमितय* ने आर एडं एम के अंतग2त काया2Cव यन के िलए प3रयोजनाE / योजनाE क(cid:25) पहचान क(cid:25)। दशे म(cid:17) हाइrो इलेिd"क पावर प3रयोजनाE के आर एडं एम के िलए रा!" ीय प3र<े%य योजना द8त ावेज वष2 2000 के दौरान सीईए म(cid:17) तैयार क(cid:25) िजसम(cid:17) 11व(cid:7) योजना के अंत तक अथा2त वष2 2011-12 म(cid:17) काया2Cव यन पूण2 करने के िलए िविभCन प3रयोजनाE/योजनाE क(cid:25) पहले ही पहचान कर ली। 11व(cid:7) योजना का सारांश नीचे तािलका 4.7 म(cid:17) 4दया गया ह।ै हाइrो आर एडं एम, िमयाद बढ़ाना तथा अ#तनीकरण योजनाE और िनयोिजत प3रयोजनाE, पूण2 4कया गया काय2 तथा 12व(cid:7) योजना म(cid:17) िजन पर काम चल रहा ह,ै का िववरण नीच े ततततााााििििललललककककाााा 4444....8888 म(cid:17) 4दया गया ह।ै¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 93 ततततााााििििललललककककाााा 4444....7777 आआआआरररर एएएएडडंंडडंं एएएएमममम ततततथथथथाााा ििििममममययययाााादददद बबबबढ़ढ़ढ़ढ़ाााानननन ेे ेेततततथथथथाााा ककककाााायययय``(cid:22)(cid:22)``(cid:22)(cid:22) मममम ककककाााा अअअअIIIIततततननननीीीीककककररररणणणण औऔऔऔरररर 11111111वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा हहहहााााइइइइ<<<<ोोोो ककककाााा ससससााााररररााााशशंंशशंं ििििववववववववररररणणणण आआआआरररर एएएए(cid:5)(cid:5)(cid:5)(cid:5)डड डड एएएएमममम एएएएललललईईईई ततततथथथथाााा अअअअपपपपररररेेेे(cid:15)(cid:15)(cid:15)(cid:15)टटटटगगगग शशशशााााििििममममलललल पपपप(cid:21)(cid:21)(cid:21)(cid:21)ररररययययोोोोजजजजननननाााा(cid:26)(cid:26)(cid:26)(cid:26) कककक(cid:28)(cid:28)(cid:28)(cid:28) सससस(cid:31)(cid:31)ंं(cid:31)(cid:31)ंं यय यय ाााा 13 5555 ममममतततताााा ((((ममममगगेेगगेे ााााववववााााटटटट)))) 3363.2 1111444455558888....00000000 अअअअननननममुुममुु ााााििििननननतततत ललललाााागगगगतततत ((((ककककररररोोोोड़ड़ड़ड़ """"पपपपएएएए)))) 444411112222....88883333 ####ककककययययाााा गगगगययययाााा $$$$यय यय यययय ((((ककककररररोोोोड़ड़ड़ड़ """"पपपपएएएए)))) 33331111....00003333....2222000011112222 ततततकककक 222299994444....88884444 ललललिििि तततत ललललााााभभभभ ((((ममममगगेेगगेे ााााववववााााटटटट)))) - 888822226666 &&&&ाााा’’’’तत तत ववववाााा))))तत तत ििििववववकककक ललललााााभभभभ ---- 777733335555 ततततााााििििललललककककाााा 4444....8888 आआआआरररर एएएएडडंंडडंं एएएएमममम ततततथथथथाााा ििििममममययययाााादददद बबबबढ़ढ़ढ़ढ़ाााानननन ेे ेेततततथथथथाााा ककककाााायययय``(cid:22)(cid:22)``(cid:22)(cid:22) मममम ककककाााा अअअअIIIIततततननननीीीीककककररररणणणण औऔऔऔरररर 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा हहहहााााइइइइ<<<<ोोोो ककककाााा ससससााााररररााााशशंंशशंं ििििववववववववररररणणणण आआआआरररर एएएए(cid:5)(cid:5)(cid:5)(cid:5)डड डड एएएएमममम एएएएललललईईईई एएएएवववव ंं ंंऑऑऑऑपपपपररररेेेे(cid:9)(cid:9)(cid:9)(cid:9)टटटटगगगग शशशशााााििििममममलललल पपपप(cid:17)(cid:17)(cid:17)(cid:17)ररररययययोोोोजजजजननननाााा(cid:22)(cid:22)(cid:22)(cid:22) कककक(cid:24)(cid:24)(cid:24)(cid:24) सससस(cid:27)(cid:27)ंं(cid:27)(cid:27)ंं यय यय ाााा 7 33336666 (cid:28)(cid:28)(cid:28)(cid:28)ममममतततताााा ((((ममममगगगगेेेे ााााववववााााटटटट)))) 2583.25 4444000088884444....55550000 अअअअननननममुुममुु ााााििििननननतततत ललललाााागगगगतततत ((((ककककररररोोोोड़ड़ड़ड़ (cid:31)(cid:31)(cid:31)(cid:31)पपपपएएएए)))) 4444444433333333....66667777 ककककययययाााा गगगगययययाााा !!!!यय यय यययय ((((ककककररररोोोोड़ड़ड़ड़ (cid:31)(cid:31)(cid:31)(cid:31)पपपपएएएए)))) 33331111....00003333....2222000011112222 ततततकककक 999999994444....77772222 ललललिििि(cid:28)(cid:28)(cid:28)(cid:28)तततत ललललााााभभभभ ((((ममममगगेेगगेे ााााववववााााटटटट)))) - 3333777777773333....22225555 ििििववववववववररररणणणण ---- ---- संि(cid:18)िxयां : एमडIj य ू – मेगावाट; आरईएस, – रे8ट ोरेशन; यू – अपरे[टग; एलई– लाइफ एdस ट(cid:17)शन। , 12व(cid:7) योजना के दौरान िजन हाइrो प3रयोजनाE पर िवचार 4कया गया वे अनुबंध 4.3 म(cid:17) दी गई ह।O 4444....2222....5555 11112222 पपपपररुुररुु ाााानननन ेे ेेऔऔऔऔरररर अअअअ(cid:26)(cid:26)(cid:26)(cid:26)मममम थथथथममममलल(cid:22)(cid:22)लल(cid:22)(cid:22) 7777लल लल ाााांंeeeंंeसससस ककककोोोो बबबबददंंददंं ककककररररननननाााा पुराने और अ(cid:18)म थम2ल =ल ा‡ं स को बंद करना और उनके 8थ ान पर नए और अिधक स(cid:18)म इकाइय* क(cid:25) 8थ ापना करना। nधन के उपयोग और जीएचजी उQस ज2न* को कम करने का एक <भावी तरीका ह।ै 11व(cid:7) योजना के दौरान 3,,,,000 मेगावाट (cid:18)मता का ल%य था िजसे छोड़ 4दया गया। इसम(cid:17) 100 मेगावाट से कम आकार क(cid:25) कोयला और िल‚न ाइट इकाइयां शािमल थ(cid:7)। 12व(cid:7) योजना के दौरान लगभग 4,,,,000 मेगावाट क(cid:25) (cid:18)मता वाली इकाइय* को बंद करने का <8त ाव ह,,ै,, िजसम (cid:17) 100 मेगावाट आकार से कम क(cid:25) कोयला और िल‚न ाइट क(cid:25) शेष इकाइयां,,,, 30 वष2 से अिधक पुराने गैस संयRं (1987 और उससे पहले के) और 110 मेगावाट (cid:18)मता क(cid:25) कुछ कोयला इकाइयां शािमल ह।O 13व(cid:7) योजना के दौरान,,,, 4,,,,000 मेगावाट (cid:18)मता को बंद करने पर िवचार 4कया गया िजसम(cid:17) 200 मेगावाट से कम क(cid:25) कमी कोयला इकाइयां (1982 से पूव2 8थ ािपत) और 1992 स े पूव2 8थ ािपत गैस इकाइयां (20 वष 2 स े अिधक पुरानी) शािमल ह।O 4444....2222....6666 उउउउNNNNपप पप ााााददददनननन औऔऔऔरररर ऊऊऊऊजजजजाााा (cid:22)(cid:22) (cid:22)(cid:22) ककककााााययययकक(cid:22)(cid:22)कक(cid:22)(cid:22) ुुुुशशशशललललतततताााा उउउउपपपपाााायययय उस प3रि8थित म(cid:17) जब भारत अपनी िवकास <4Bया म(cid:17) तेजी लाने का <यास करता ह ै और ऊजा2 क(cid:25) बढ़ती ,ई मांग का सामना कर रहा होता ह ै तब हमारी ऊजा2 नीित म(cid:17) संर(cid:18)ण और ऊजा2 स(cid:18)म उपाय* क(cid:25) महQव पूण2 भूिमका होती ह।ै ऊजा2 संर(cid:18)ण का एक रा!" ीय आंदोलन आने वाले वषU म(cid:17) ऊजा2 आपूPत <णािलय* म(cid:17) नए िनवेश क(cid:25) आव)य कता को काफ(cid:25) कम कर सकता ह।ै ऊजा 2 संर(cid:18)ण एक उ()े य ह ै िजसम(cid:17) दशे का <Qय ेक नाग3रक योगदान कर94 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] सकता ह ै चाह े घर हो या फैd" ी,,,, छोटी मोटी दकु ान हो या बड़ा वािणिoयक भवन,,,, 4कसान या काया2लय म(cid:17) काम करने वाला <Qय ेक उपयोगकता2 का उQप ादक अपने लाभ तथा दशे के िहत म(cid:17) इस <यास को करे। भारत सरकार ने पहले ही ऊजा2 संर(cid:18)ण अिधिनयम,,,, 2001 (ईसी अिधिनयम) अिधिनयिमत 4कया ह ै जो अथ2Kय व8थ ा के सभी (cid:18)ेR* म(cid:17) ऊजा2 (cid:18)मता के संवध2न के िलए अित- आव)य क कानूनी ढांचा और सं8थ ागत <बंध <दान करता ह।ै इस ईसी अिधिनयम के अंतग2त 4दनांक 19.3.2007 क(cid:25) सरकारी अिधसूचना के aारा ताप िव#तु केCf * को पहले ही नामो4द!ट उपभोdत ा के Nप म(cid:17) घोिषत 4कया गया ह।ै िव#ुत केCf * के िलए ईसी अिधिनयम के अंतग2त िनbन िलिखत कुछ संगत उपबंध नामो4द!ट उपभोdत ा Nप म(cid:17) ह O : 1. ऊजा2 (cid:18)मता और संर(cid:18)ण 4Bयाकलाप* के <भारी उजा 2 <बंधक को नामो4द!ट या िनयdु त करना; 2. 4कसी माCय ऊजा2 लेखापरी(cid:18)क aारा ऊजा2 लेखा-परी(cid:18)ा करना; 3. <युdत ऊजा2 और माCय ता <ा=त ऊजा2 लेखा-परी(cid:18)क* क(cid:25) िसफा3रश पर क(cid:25) गई कार2वाई के बारे म(cid:17) सूचना <8त ुत करना; 4. ऊजा2 खपत के मानदvड * का अनुपालन केCf ीय िव#ुत <ािधकरण ने भी सभी ताप िव#ुत केCf * म(cid:17) ऊजा2 स(cid:18)म <को!ठ * के सजृ न पर कार2वाई शुN क(cid:25) ह।ै केCf ीय िव#ुत <ािधकरण ने भी मैसस2 जीआईजेड,,,, जम2नी के सहयोग से भारत जमन2 ऊजा2 काय2Bम (आईजीईएन) के अंतग2त इन <को!ठ * aारा अपेि(cid:18)त <िश(cid:18)ण आव)य कताE को अंितम Nप 4दया ह।ै आईजीईएन कायB2 म के अंतग2त इन ऊजा2 स(cid:18)म <को!ठ * के <भावी काय2करण के िलए ऊजा2 (cid:18)मता पर िविभCन (cid:18)ेRीय काय2शालाएं / सेिमनार आयोिजत 4कए जा रह े ह।O अ#तन <ौ#ोिग4कय* को शािमल करके और प3रचालनरत िव#ुत केCf * क(cid:25) (cid:18)मता बढ़ाने के उ()े य से दशे म (cid:17) िव#ुत केCf * क(cid:25) ज3टल प3रचालनाQम क सम8य ाE से िनपटने के उ()े य से भारत – जम2न ऊजा2 मंच के अंतगत2 भारतीय िव#तु (cid:18)ेR के िलए एक उQक ृ!ट ता वृि(cid:23) केCf (ईईसी) 8थ ािपत करने का <8त ाव था, सीईए, बीईई तथा जीआईजेड के म(cid:2)य 8 िसतंबर, 2011 को काया2Cव यनकरार पर ह8त ा(cid:18)र 4कए गए थे। ईईसी के उ()े य िनbन िलिखत ह O : क. िव#ुत के सभी (cid:18)ेR* म(cid:17) वेहत प(cid:23)ितय* म (cid:17) भागीदार होना और Kय ापक आधा3रत िवशेषwता <दान करना। ख. उQक ृ!ट ता क(cid:25) आव)य कता के <ित जागNकता पैदा करना ग. <ौ#ोिगक(cid:25)य िवकास के िलए =ल ेटफाम2 हते ु उ#ोग* के साथ पर8प र संपक2 के िलए एक ठोस, घ. सामाCय चुनौितय* क(cid:25) पहचान करना, सामाCय समाधान िवकिसत करना और िव#ुत (cid:18)ेR के िलए संपक2 का एक केCf िबCद ु<दान करना, ङ. िव#ुत (cid:18)ेR म(cid:17) शीष2 िवशेषw* के िलए एक =ल ेटफाम2 मुहयै ा करना सोसाइटी पंजीकरण अिधिनयम 1860 क(cid:25) संZय ा XXI के अंतग2त उQक ृ!ट ता वृि(cid:23) केCf एक सोसाइटी के Nप म (cid:17) िवकिसत 4कया गया ह ै जो नवंबर, 2010 को 4दjल ी के रा!" ीय राजधानी (cid:18)ेR पर लागू ह।ै इस केCf न े अपना काय2 सीबीआईपी भवन, मालचा माग2, चाणdय पुरी, नई 4दjल ी से आरंभ कर 4दया ह।ै सीईए के चेयरपस2न ईईसी क(cid:25) शासी िनकाय के अ(cid:2)य (cid:18) ह।O सोसाइटी के शासी िनकाय म(cid:17) सीईए, एनटीपीसी, बीईई, वीजीबी, जम2नी तथा जीआईजेड के सद8य शािमल ह।O जीआईजेड, जम2नी बीएमयू जम2नी क(cid:25) िनिधय* से <8त ािवत ईईसी के 4Bयाकलाप* म(cid:17) सहायता कर रहा ह।ै वीजीबी, जम2नी तथा अCय यूरोपीय दशे * म(cid:17) उपलIध wान और िवशेषwता म(cid:17) भागीदार होकर ईईसी क(cid:25) सहायता करेगा।¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 95 ईईसी अलाभकारी सद8य * वाली सोसाइटी ह।ै सद8य बनाने का काय2 <गित पर ह।ै कई संगठन जैसे बीएचईएल, जे एडं के पावर डवलपम(cid:17)ट कॉप„रेशन, एनटीपीसी; िहताची, ईओएन, 8ट ील रQन ािग3र पावर, सीपीआरआई आ4द ने पहले भी सद8य ता के िलए ईईसी से संपक2 4कया ह।ै ईईसी ने पैट 8क (cid:25)म के िवषय पर कोलकाता म(cid:17) एक (cid:18)ेRीय काय2शाला का आयोजन 4कया ह।ै भिव!य म(cid:17) और अिधक (cid:18)ेRीय काय2शालाए ं आयोिजत करने का <8त ाव ह।ै 4444....2222....7777 ससससससंंससंं ााााधधधधनननन'''' ककककाााा ककककुुुुशशशशलललल (cid:1)(cid:1)(cid:1)(cid:1)ययययोोोोगगगग संसाधन* के <योग म(cid:17) काय2कुशलता एक महQव पूण2 घटक ह ै dय *4क यह सीिमत ससं ाधन* से अिधक उQप ादक आउटपुट को बढ़ावा दने े के साथ-साथ पया2वरण म(cid:17) काब2न फुटJ<ट को घटाता ह।ै सह-उQप ादन िव#ुत और उपयोगी ऊ! मा दोन* के पार8प 3रक उQप ादन के िलए 4कसी ऊ!म ा इंजन अथवा पावर 8ट ेशन के इ8त ेमाल से 4कया जाता ह।ै सह-उQप ादन म(cid:17) nधन का <योग तापीय गितशीलता के साथ कुशल ढंग स े 4कया जाता ह।ै पारंप3रक पावर =ल ांट कूJलग टावर*, nधन गैस अथवा अCय 4कसी साधन के Nप म(cid:17) पया2वरण म (cid:17) िव#ुत उत प् ादन के 4कसी सह-उQप ाद के Nप म(cid:17) सृिजत ऊ!म ा उQसPजत करते ह।O संयुdत ऊ!म ा और िव#ुत (सीएचपी) घरेलू अथवा औ#ोिगक ऊ!म न <4BयाE के िलए सह उQप ाद के Nप म(cid:17) ऊ!म ा अवशोिषत करती ह।ै जब ऊ!म ा का <योग 8थ ल पर ही अथवा उसके ब,त िनकट 4कया जा सकता हो, तो ऐसी ि8थित म(cid:17) सीएचपी सवा2िधक कुशल साधन माना जाता ह।ै जब ऊ!म ा का अिधक दरू ी तक पारगमन 4कया जाता ह ै तो ऐसी ि8थित म(cid:17) संपूण2 काय2कुशलता घट जाती ह।ै ििििममममििििffffतततत (cid:1)(cid:1)(cid:1)(cid:1)शशशशीीीीततततनननन, तततताााापपपपनननन औऔऔऔरररर पपपपााााववववरररर ((((ससससीीीीससससीीीीएएएएचचचचपपपपीीीी)))) सीम(cid:17)ट संयंR, रासायिनक उ#ोग, व8R संयंR आ4द जसै ी बड़ी औ#ोिगक इकाइयां कई वषU से अपने कैि=टव िव#ुत संयंR* स े िबजली ले रह े ह।O इनम (cid:17) स े कई इकाइय* के पास <ोसेस 8ट ीम या िचJjलग क(cid:25) आव)य कताE क(cid:25) पूPत के िलए अपिश!ट हीट 3रकवरी भी ह।ै गत कुछ वषU म(cid:17) आईटी कॉbप लेdस , डटे ास(cid:17)टर, आधुिनक इकाई अˆ* आ4द के Nप म(cid:17) बड़ े वािणिoयक भवन* क(cid:25) संZय ा म(cid:17) वृि(cid:23) ,ई ह,ै िजनक(cid:25) िबजली क(cid:25) आव)य कता ब,त अिधक होती ह ै dय *4क ये भवन पूण2तया वातानुकूिलत होत े ह।O इसिलए िबजली क(cid:25) आव)य कता ब,त अिधक होती ह।ै उनके सकं ेCf ण भार अपिश!ट तापन से उनके वातानुकूलन भार के एक भाग के उपयोग क(cid:25) संभावना के कारण ये कंबाइंड तापन और <शीतन सोjय ूशन के िलए अzछ े होते ह।O इसके अलावा, उनके अलग-अलग िबजली भार के कारण ये प3रचालनाQम क |लेिdसिबिलटी क(cid:25) अिधक मांग करते ह।O 25 मेगावाट भार से अिधक वािणिoयक उपभोdत ाE के िलए 8व 8थ ान े िव#ुत उQप ादन करना अिनवाय2 होना चािहए और Cय ूनतम 60% थम2ल (cid:18)मता का <दश2न करना चािहए। ऊपर वPणत <ोQस ाहन* के कारण इसका अनुपालन क3ठन नह(cid:7) होगा। भवन 8व ामी aारा कैि=टव िव#ुत संयंR के तौर पर सीएचपी संयंR* क(cid:25) 8थ ापना क(cid:25) जा सकती ह।ै ऐस े कुछ भवन िमलकर एक \ुप कैि=टव िव#ुत संयंR 8थ ािपत कर सकते ह।O ऐसे संयंR* स े ऊजा2 को ''डीbड नवीकरणीय ऊजा’2’ के Nप म(cid:17) दखे ा जाएगा और उQप ादनकता2E को ि\ड या िव#ुत (cid:18)ेR* स े अिधक िबजली िनया2त करने का अिधकार क(cid:25) अनुमित होगी। ऐसे ''िवदइन द फ(cid:17)स’’ सीसीएचपी संयंR* के िलए <ाकृितक गैस (8व zछ ) के उपयोग म(cid:17) य4द अिधक नह(cid:7) तो बराबर के अवसर मौजूद ह।O आवंटन को सावधानीपूव2क बांटने और सीएचपी अनु<योग* के िलए <ाकृितक गैस के उपयोग को <ितबंिधत करना जो कम स े कम 60% क(cid:25) (cid:18)मता द े सकत े ह।O 4444....2222....8888 ििििववववतततत////ररररतततत उउउउNNNNपप पप ााााददददनननन िवत3रत (cid:18)मता सभी (cid:18)ेR*/राoय * म(cid:17) फैले जनरेशन का 8थ ान ह।ै अdस र वे पवन, बायोगैस, सौर या गैस/डीजल इंजन के Nप म(cid:17) ह।ै िवत3रत उQप ादन के मुZय लाभ िनbन िलिखत ह O :96 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] • ककककमममम पपपपााााररररेेेेषषषषणणणण (cid:26)(cid:26)(cid:26)(cid:26)िििितततत िवत3रत |लेिdसबल जनरेशन खपत और भार केCf * के िनकट ि8थत होत े ह।O इसिलए पारेषण हािनया ं Cय ूनतम होती ह।O • ककककमममम पपपपााााररररेेेेषषषषणणणण ििििननननववववशशेेशशेे यूएमपीपी से संब(cid:23) पारेषण लाइन <णाली बनाने के िलए एक करोड़ Tपए मेगावाट आव)य कता क(cid:25) तुलना म(cid:17) पारेषण िनवेश को Cय ूनतम 4कया जाता ह।ै • तततत वव् ् वव ् ् ////ररररतततत (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा ववववधधधधनन(cid:22)(cid:22)नन(cid:22)(cid:22) यह बड़ े संयंR* से अिधक सZं य ा म(cid:17) छोटे संयंR* क(cid:25) ओर िश|ट करना समथ2 बनाता ह ै अथा2त 25-200 मेगावाट क(cid:25) र(cid:17)ज म(cid:17)। य े Qव 3रत (cid:18)मतावध2न को समथ2 बनाते ह।O य े संयंR आमतौर पर मानक(cid:25)कृत िव#ुत जनरे [टग Iल ॉक का <योग करते ह O और उzच िपफेि‰केशन और माŠुलाइजेशन िनयोिजत करत े ह।O इसके कारण साइट वक2 के समय म (cid:17) काफ(cid:25) कमी ,ई और इस <कार, 8ट ाट2-अप का समय काफ(cid:25) कम ह।ै • >>>>यय य य ननूूननूू ववववाााा(cid:2)(cid:2)(cid:2)(cid:2)तत तत ििििववववकककक ससससववंंववंं ददेेददेे ननननशशशशीीीीललललतततताााा ततततथथथथाााा जजजजोोोोििििखखखखमममम उउउउपपपपशशशशममममनननन Cय ून वा8त िवक संवेदनशील तथा जोिखम उपशमन िव)व सनीयता म(cid:17) वृि(cid:23) करन,े गुणवQत ा म(cid:17) सुधार करन,े पारेषण लागत कम करन,े अिध\हण लागत कम करने के अलावा Kय ापक भौगोिलक (cid:18)ेR म(cid:17) उQप ादन के िबCद Eु का िव8त ार करके िवत3रत उQप ादन वै#तु <णाली क(cid:25) नाजुकता को कम करता है। य4द बड़ े केCf ीकृत संयंR <ाकृितक आपदाE या आतंकवाद से <भािवत होते ह O तो <भाव तQक ाल और अिधक हो सकता ह ै dय *4क िव#ुत आपूPत का बड़ा िह8स ा िस8ट म स े छूट जाता ह।ै िवत3रत संयंRजो िविभCन साइट* से छोटी माRा म(cid:17) िबजली उQप ादन सुिनिcत करते ह,O इस कमजोरी को दरू करत े ह O और िस8ट म क(cid:25) सहायता म(cid:17) सुधार करत े ह।O शहरी समूह िजनके पास अQय िधक संवेदनशील या रणनीितक महQव के कई <ित!ठ ान होते ह,O िवशेषकर जोिखम उपशमन से लाभािCवत ह*गे जो ऐसे िवत3रत |लेिdसिबिलटी जनरेशन <दान करत े ह।O • NNNNवव वव ////ररररतततत ििििववववNNNNतत तत ीीीीयययय बबबबददंंददंं ीीीी िजन प3रयोजनाE का िनवशे कम होता ह ै उCह (cid:17) िवQत ीय Nप से शी… ही बंद 4कया जा सकता ह।ै • ककककमममम भभभभििूूििूू मममम कककक1111 आआआआववववYYYYयय यय ककककतततताााा,,,, >>>>यय यय ननूूननूू ततततमममम जजजजलललल उउउउपपपपययययोोोोगगगग िव त3रत उQप ादन <ौ#ोिग4कय* से (cid:18)ेR फुटJ<ट <ित मेगावाट म(cid:17) काफ(cid:25) कमी आती ह।ै ये अिधक जल क(cid:25) खपत नह(cid:7) करते ह O और <ाकृितक ससं ाधन* पर भार नह(cid:7) डालते ह।O • बबबबहहेेहहेे ततततरररर ििििAAAAडडडड ससससहहहहााााययययतततताााा िवत3रत उQप ादन बहे तर ि\ड सहायता <दान करता ह ै और आईलOड 8क (cid:25)म (cid:17) का8क ेड 3"Jपग स े लोड केCf * को पृथक कर सकती ह।O 4444....2222....9999 ककककोोोोययययललललाााा गगगगणणुुणणुु ववववNNNNतत तत ाााा ससससधधुुधधुु ाााारररर :::: कोयला िवशेषताE का िव#ुत उQप ादन के िलए उपलIध भारतीय कोयला कुल िमलाकर घ3टया गुणवQत ा का होता ह,,ै,, िजसम(cid:17) राख क(cid:25) अिधक माRा होती ह,,ै,, िजसके फल8व Nप िव#ुत संयंR* क(cid:25) (cid:18)मता कम हो जाती ह।ै भारतीय िव#तु संयंR* के िलए उपलIध कोयले का औसत कुल dल ो3र4फक मान 3000-4500 के सीएल/4Bलो\ाम क(cid:25) र(cid:17)ज म(cid:17) ह,,ै,, िजसम(cid:17) राख क(cid:25) माRा 40% तक ह।ै कोल वाJशग या Cय ून ऐश आयाितत कोयला aारा बेिन4फिसएटेड कोयले का उपयोग कुछ 8ट ेशन* म(cid:17) 4कया जा रहा ह।ै बेिन4फिसएटेड कोयले के उपयोग से न केवल संयंR के िन!प ादन म(cid:17) सुधार होगा बिjक Cय ून काब2न उQस जन2 ह*ग े और इसस े सम\ प3रचालन और रख- रखाव लागत* म(cid:17) कमी होगी। कई संयंR* ने धुले ,ए कोयले का <योग करना शुN कर 4दया ह ै और ये आयाितत कोयले से Iल (cid:17)Jडग क(cid:25) <4Bया म(cid:17) ह ै िजससे उनके संयंR के िन!प ादन म(cid:17) सुधार होगा।¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 97 पया2वरण एवं वन मंRालय ने एक अिधसूचना जारी क(cid:25) ह ै िजसके अनुसार िपटहडे स े 1000 4कलोमीटर के अंदर ि8थत संयंR*,,,, शहरी,,,, संवेदनशील और अQय िधक <दिू षत (cid:18)ेR* म(cid:17) अवि8थत थम2ल पावर संयंR* के िलए यह आव)य क ह ै 4क वे कzच ा माल या Iल (cid:17)डडे या बेिन4फिसएटेड कोयले का <योग कर(cid:17) िजसम(cid:17) राख क(cid:25) माRा <ित वष 2 औसतन 34% से अिधक न हो। भारतीय कोयला धोने के िलए कम अनुकूल ह,,ै,, इसिलए इसे क3ठन वग(cid:12)कृत 4कया गया ह ै dय *4क धुलाई याjड छोटा होता ह।ै अत: धुलाई और ईjड क(cid:25) लागत को अिधकतम करने के उ()े य स े उपयुdत तकनीक(cid:25) समाधान खोलने ह*गे। |लूडाइoड बडे कंब8ट न (एफबीसी) बॉयलर* को िबजली उQप ादन के िलए धुलाई क(cid:25) लागत म(cid:17) 4कफायत के िलए र(ी का उपयोग करके 4कया जा सकता ह।ै कई िनजी वाश3रयां वाशरी र(ी पर आधा3रत लघु (cid:18)मता एफबीसी इकाइय* क(cid:25) 8थ ापना कर रह े ह।O इस समय,,,, लगभग 323 िमिलयन टन क(cid:25) कुल कोयला खपत म(cid:17) से धुले कोयले क(cid:25) माRा केवल 33 िमिलयन टन ह।ै कोयला खनन,,,, धुलाई के िलए िनजी और सरकारी िव#ुत कंपिनय* को कोयला Iल ॉक आवंटन म(cid:17) तजे ी आएगी। बड़ े आकार क(cid:25) सुपर4B3टकल इकाइयां धुले/आयाितत कोयले का उपयोग कर(cid:17)गी। 4444....3333 भभभभााााररररतततत मममम $$ $$ननननववववीीीीककककररररणणणणीीीीयययय ऊऊऊऊजजजजाााा (cid:22)(cid:22) (cid:22)(cid:22)DDDDोोोोतततत'''' सससस ेेेेउउउउNNNNपप पप ााााददददनननन नवीकरणीय ऊजा2 qोत का उपयोग परंपरागत ऊजा2 qोत* से कह(cid:7) अिधक बेहतर िवकjप ह।ै तथािप, िवशेष मामले म(cid:17) उनक(cid:25) गुणवQत ा सीिमत ह।ै और य े िबजली कंपिनय* क(cid:25) मांग को पूरा करने म(cid:17) स(cid:18)म नह(cid:7) ह।O इसके अलावा, ये आमतौर पर अलग 4क8म पर आधा3रत गैर <ेषणीय ऊजा2 <दान करते ह O और इस <कार िस8ट म क(cid:25) Kय 8त तम मांग पूरा करन े के िलए इन पर िनभ2र नह(cid:7) रहा जा सकता ह।ै य े सामाCय तया 15% से 20% क(cid:25) सम\ पीएलएफ (कुल (cid:18)मता पर आधा3रत पीएलएफ और सभी नवीकरणीय qोत* से ऊजा2 क(cid:25) माRा) पर चलती ह।O इसम(cid:17) अित3रक्त , िव#ुत उQप ादन <ौ#ोिग4कयां मंहगी होती ह O िजसस े उQप ादन िबजली शुjक बढ़ जाता ह।ै तथािप, अपने अंतPनिहत खिू बय* के कारण इन िव#ुत qोत* के िवकास को <ोQस ािहत 4कया जा रहा ह ै और उQप ा4दत िव#ुत को ि\ड म(cid:17) प,चं ाया जाता ह।ै 4444....3333....1111 ननननववववीीीीककककररररणणणणीीीीयययय कककक1111 ससससभभंंभभंं ााााTTTTयय यय तततताााा नवीकरणीय ऊजा2 qोत* के िवकास पर बल 4दया जा रहा ह ै जो न केवल एक नवीकरणीय qोत ह ै बिjक पया2वरणीय Nप से िहतकर भी ह।ै नवीकरणीय ऊजा2 qोत मंRालय ने 8व यं 45,0000 मेगावाट पवन ऊजा2 क(cid:25) संभावना का अनुमान लगाया ह।ै अपरंपरागत ऊजा2 qोत* के अCय Nप बायोमास, स%ू म और लघ ु हाइrो (केनल फाjस का उपयोग करके dय *4क इसस े िसिवल कायU क(cid:25) लागत Cय ूनतम होती ह)ै के तौर पर oव ारीय िव#ुत और सौर ऊजा2 ह।O ये उन दरू -दराज के 8थ ान* म(cid:17) जहां ि\ड का िव8त ार करना ब,त क3ठन और अिधक लागत का होता ह,ै क(cid:25) मांग पूरा करन े के िलए िवत3रत उQप ादन के Nप म(cid:17) भी Kय वहाय2 होत े ह।O अjप समय म(cid:17) इन qोत* का उपयोग िवशेषकर भौ गोिलक Nप स े (cid:18)ेR* म(cid:17) मांग-आपूPत अंतर को कम करना ह।ै आज, परंपरागत ऊजा 2 क(cid:25) पूंजी लागत पवन ऊजा 2 को छोड़कर <ित केडIj य ू आधार पर परंपरागत qोत* स े काफ(cid:25) अिधक ह।ै तथािप, उनक(cid:25) Kय वहाय2ता तभी 8थ ािपत हो सकती ह ै य4द िवQत ीय लाभ िव)ल ेषण के 8थ ान पर आPथक लागत लाभ िव)ल ेषण <ित8थ ािपत 4कया जाए। नवीकरणीय ऊजा2 qोत मंRालय aारा <8त ुत सूचना के अनुसार दशे म(cid:17) पवन लघु हाइrो, सौर अपिश!ट से ऊजा2 और बायोमास जैसे नवीकरणीय ऊजा2 qोत* स े िव#ुत उQप ादन के िलए कुल अनुमािनत म(cid:2)य ाविध संभाKय ता (2032) लगभग 1,83,000 मेगावाट ह,ै जैसा 4क नीच े तािलका 4.9 म(cid:17) दशा2या गया ह।ै98 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ततततााााििििललललककककाााा 4444....9999 (आंकड़ े मेगावाट म(cid:17)) DDDDोोोोतततत/ (cid:1)(cid:1)(cid:1)(cid:1)णणणणााााललललीीीी अअअअननननममुुममुु ााााििििननननतततत मममम((((यय यय ााााववववििििधधधध (2032) ससससभभंंभभंं ााााववववननननाााा पवन िव#ुत 45,000 जैव िव#ुत (कृिष अवशेष और पौध रोपण) 66661111,,,,000000000000 को सह-उQप ादन अवसाब 5555,,,,000000000000 लघु हाइrो ((((22225555 मेगावाट तक)))) 11115555,,,,000000000000 अपिश! ट से ऊजा2 7777,,,,000000000000 सौर फोटोवोjट ेक 55550000,,,,000000000000**** जोड़ 1111,,,,88883333,,,,000000000000 * रा!" ीय सौर िमशन के उ()े य के अनुसार 2030 तक 1,,,,00,,,,000 मेगावाट सौर उQप ादन (cid:18)मता और 2050 तक 2,,,,00,,,,000 मेगावाट (cid:18)मता 8थ ािप त क(cid:25) जाएगी। 4444....3333....2222 ननननववववीीीीककककररररणणणणीीीीयययय ऊऊऊऊजजजजाााा (cid:22)(cid:22) (cid:22)(cid:22)DDDDोोोोतततत'''' ककककाााा ििििववववककककाााासससस नवीकरणीय ऊजा2 को जलवायु प3रवत2न संबंधी भारत क(cid:25) रा!" ीय काय2 योजना म(cid:17) उपयुdत Nप से मुZय 8थ ान 4दया गया ह।ै जलवायु प3रवत2न पर अंतर-सरकारी पैनल-आईपीसीसी) ने अपनी चौथी 3रपोट2 म(cid:17) इंिगद 4कया ह,ै ‘‘जलवायु प3रवत2न के उपशन के िलए <ौ#ोिग4कयां उपलIध हO, तथािप इCह (cid:17) उपयुdत नीित और िवQत ीय सहायता क(cid:25) आव)य कता ह।ै नवीकरणीय ऊजा 2 प3रयोजनाEके िलए Kय ापक बाजार सभं ावाKय ता और एक अपे(cid:18)ाकृत सुिवकिसत औ#ोिगक, िवQत पोषण और Kय वसाय के कारण 8व zछ िवकास तंR (सीडीएम) प3रयोजनाE और <ौ#ोिगक(cid:25) नवो‹व के िलए पया2=त अवसर <दान करता ह।ै आमतौर पर सोिडयम और उभरता ,आ काब2न बाजार क(cid:25) नवीकरणीय ऊजा 2 प3रयोजनाE क(cid:25) िवQत ीय Kय वहाय2ता म (cid:17) योगदान करन े क(cid:25) संभाKय ता ह ै हाला4ं क उCह (cid:17) परू ी तरह Kय वहाय2 बनाना आव)य क नह(cid:7) ह।ै िव#ुत अिधिनयम, 2003 म (cid:17) भी िबजली ि\ड और अकेली <णािलय* के िलए नवीकरणीय ऊजा2 <ौ#ोिग4कय* क(cid:25) भूिमका को माCय ता दी गई ह।ै यह राoय िव#तु िविनयामक आयोग* (एसईआरसी) को नवीकरणीय ऊजा2 को बढ़ावा दने े और िवतरण लाइस(cid:17)सी के एक भाग नवीकरणीय (cid:18)ेR म(cid:17) िबजली खरीदने का अिधकार दते ा ह।ै रा!" ीय िव#ुत नीित म(cid:17) भी कहा गया ह ै 4क अपारंप3रक ऊजा2 qोत* का पूरी तरह दोहन 4कया जाए और एसईआर सी aारा इन qोत* का पूरा उपयोग और सतत िवकास 4कया जाए। टै3रफ नीित म(cid:17) भी एसईआरसी aारा नधा23रत 4कए जाने हते ु टै3रफ के िलए लागू 4कए जान े के िलए नवीकरणीय qोत* से ऊजा2 का Cय ूनतम <ितशत अिनवाय 2 ह।ै इस <कार, िव#ुत अिधिनयम, रा!" ीय िव#तु नीित और भारत सरकार क(cid:25) टै3रफ नीित म(cid:17) ऐसे qोत* स े िबजली खरीदने के िलए 4कसी िवतरण कंपनी क(cid:25) बा(cid:2)य ता <णाली के ज3रए नवीकरणीय qोत* का िवकास करन े क(cid:25) बात कही गई ह।ै ये पहल े भारत म(cid:17) िवकरण ऊजा2 (cid:18)ेR के संवध2न के िलए बड़ा बढ़ावा दते े ह।O 11व(cid:7) योजना के अंत अथा2त 31.3.2012 तक नवीकरणीय ऊजा2 qोत* से कुल 8थ ािपत (cid:18)मता 24,914 मेगावाट थी। पवन टबा2इन िव#ुत सयं ंR* क(cid:25) 8थ ािपत (cid:18)मता के संदभ2 म(cid:17) िव)व म(cid:17) भारत का पांचवां 8थ ान ह,ै नवीकरणीय qोत* से 11व(cid:7) योजना के िलए (cid:18)मता वृि(cid:23) ल%य 14,000 मेगावाट (सौर िमशन के अतं ग2त <8त ािवत सौर (cid:18)मता को छोड़कर) ह।ै¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 99 12व(cid:7) और 13व(cid:7) योजना के दौरान नवीकरणीय qोत* से (cid:18)मता वृि(cid:23) 11व(cid:7) योजना (cid:18)मतावृि(cid:23) स े अिधक होन े का अनुमान ह।ै सौर और पवन आधा3रत िव#ुत संयंR* क(cid:25) 8थ ापना के िलए नवीकरणीय ऊजा 2 qोत मंRालय aारा कई पहले क(cid:25) गई ह।O 12व(cid:7) और 13व(cid:7) योजना के दौरान नवीकरणीय से Bमश: लगभग 29,500 मेगावाट और 30,500 मेगावाट (cid:18)मता अिभवृि(cid:23) का अनुमान ह।ै 11व(cid:7) योजना के आरंभ म(cid:17) अथा2त 31.3.2007 तक नवीकरणीय ऊजा 2 qोत* स े 7,761 मेगावाट लेकर 11व(cid:7), 12व(cid:7) तथा 13व(cid:7) योजनाE के अंत तक नवीकरणीय ऊजा2 qोत* क(cid:25) (cid:18)मता Bमश: 24,914 मेगावाट, 54,414 मेगावाट तथा 84,914 मगे ावाट होने का अनुमान ह।ै 11व(cid:7) योजना और उससे आगे नवीकरणीय (cid:18)मता वृि(cid:23) का वण2न िनbन िलिखत िचR म(cid:17) दशा2ई गई ह ै : नवीकरणीय ऊजा2 qोत मंRालय के प3र<े%य के अनसु ार 12व(cid:7) और 13व(cid:7) योजना अविधय* के दौरान 60,000 मेगावाट क(cid:25) (cid:18)मतावृि(cid:23) क(cid:25) प3रकjप ना क(cid:25) गई ह।ै इन अनुमान* म(cid:17) ि\ड इंटरेिdटव सौर िव#तु के ज3रए जलवाय ु प3रवत2न पर रा!" ीय काय 2 योजना न े <8त ािवत सौर िमशन के अंतग2त एक {!ट (cid:18)ेR के Nप म (cid:17) बड़ े पैमाने पर सौर िव#ुत उQप ादन क(cid:25) पहचान क(cid:25) ह।ै इस योजना म (cid:17) 2020 तक 20,000 मेगावाट सौर िव#ुत का संकेताQम क ल%य क(cid:25) प3रकjप ना क(cid:25) गई ह।ै 4444....4444 ससससौौौौरररर ऊऊऊऊजजजजाााा (cid:22)(cid:22) (cid:22)(cid:22)ककककाााा ििििववववककककाााासससस 4444....4444....1111 (cid:1)(cid:1)(cid:1)(cid:1)(cid:2)(cid:2)(cid:2)(cid:2)तत तत ााााववववननननाााा िव#ुत उQप ादन के सभी अपारंप3रक qोत* म(cid:17) से भारत म(cid:17) सौर ऊजा 2 सबस े अिधक उपलIध और ऊजा2 का <चुर qोत ह।ै भारत एक उ!ण क3टबंधीय दशे ह,ै यहां <चुर धूप ह,ै इसिलए िव#ुत उQप ादन के िलए सौर ऊजा2 का आसानी से <ा=त क(cid:25) जा सकती ह।ै ि\ड से जुड़ी िव#तु और िवत3रत िव#ुत िवकjप (cid:18)ेR* म(cid:17) \ामीण िव#तु ीकरण के िलए िव#तु िवकjप * पर िवचार करते समय यह िवशेष Nप से लाभदायक ह।ै अCय नवीकरणीय और गैर जीवा)म िवकjप * जैसे आिvवक तथा पवन ऊजा 2 और बायोमास के (cid:18)ेRािधकार म (cid:17) िव8त ार करने क(cid:25) आव)य कता को 8व ीकार करते ,ए कुल ऊजा2 म(cid:17) सौर ऊजा 2 के अंश म (cid:17) पया2=त वृि(cid:23) करने के िलए जलवायु प3रवत2न हते ु रा!" ीय काय2 योजना के अंतगत2 एक रा!" ीय सौर िमशन आरंभ 4कया गया ह।ै ऊजा2 उपयोग क(cid:25) सौर <ौ#ोिगक(cid:25) क(cid:25) <गित िविभCन कारण* मुZय तया उzच पूंजी लागत और सौर <ित!ठ ान* के िलए अिधक भूिम क(cid:25) आव)य कता के कारण धीमी रही ह।ै एक और बाधा इसक(cid:25) उपलIध ता केवल ऊजा2 उपयोग हते ु 4दन के समय ही होती ह ै िजससे भंडारण प(cid:23)ित के िलए अित3रdत उzच लागत क(cid:25) आव)य कता पड़ती ह।ै <भावी भूिमका िनभान े के िलए 4कसी भी <ौ#ोिगक(cid:25) के िलए ‘’िमशन मोड’’ म(cid:17) (cid:18)मता िनमा2ण करना आव)य क100 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ह।ै तदनुसार िनकट भिव!य म(cid:17) 8थ ाियQव को (cid:2)य ान म(cid:17) रखते ,ए सौर ऊजा2 क(cid:25) <ािx अिधक <भावी तरीके स े करन े का <यास 4कए जा रह े ह।O नवीकरणीय ऊजा2 qोत मंRालय ने मेगावाट (cid:18)मता ि\ड इंटरेिdटव सौर ऊजा2 संयंR* क(cid:25) 8थ ापना के िलए माच,2 2008 म(cid:17) एक नई योजना शुN क(cid:25) ह।ै इस प3रयोजना के अंतग2त मंRालय सौर <काश बोjट ीय से उQ पा4दत िबजली के िलए <ित केडIj य ूएच अिधकतम 12 Tपए का उQप ादन आधा3रत <ोQस ाहन और सौर थम2ल िव#ुत C संयंR* के ज3रए उQप ा4दत िबजली के िलए <ित केड jय ूएच अिधकतम 10 Tपए का उQप ादन आधा3रत <ोQस ाहन दगे ा और 1 एमडIj य ूपी तथा अिधक क(cid:25) (cid:18)मता के एक ि\ड इंटरेिdटव सौर िव#ुत संयRं म(cid:17) सं<ेिषत करता ह।ै यह <ोQस ाहन दस वषU क(cid:25) अविध के िलए िनधा23रत दर पर प3रयोजना डवे लेपर* को <दान 4कया जाएगा और इसका िनधा2रण सौर िव#ुत उQप ादनकता2 को िबजली कंपनी aारा <दQत टै3रफ को (cid:2)य ान म(cid:17) रखते ,ए 4कया जाएगा। यह काय2Bम 11व(cid:7) योजना अविध के दौरान सौर िव#ुत क(cid:25) 50 एमडIj य ूपी क(cid:25) कुल 8थ ािपत (cid:18)मता तक सीिमत होगा और <Qय ेक राoय को 10 एमडIj य ूपी के कुल (cid:18)मता तक 8थ ािपत करने क(cid:25) अनुमित दी जाएगी। 4444....4444....2222 ससससौौौौरररर ऊऊऊऊजजजजाााा (cid:22)(cid:22) (cid:22)(cid:22)ककककेेेे ििििललललएएएए भभभभााााररररतततत मममम $$ $$ससससभभंंभभंं ााााववववननननाााा भूम(cid:2)य रेखा से नजदीक होने के कारण भारत पया2=त सूय2 क(cid:25) रोशनी <ा=त करता ह।ै भरत क(cid:25) भूिम (cid:18)ेR पर लगभग 5,000 3"िलयन केडIj य ूएच ऊजा2 पड़ती ह ै और अिधकांश भाग <ित4दन <ित वग2 4कलोमीटर 4-7 केडIj य ूएच <ा=त करत े ह।O िबना भंडारण सुिवधा के 1 मेगावाट सौर (cid:18)मता <ित वष2 1.6 िम.यू. का उQप ादन करता ह।ै भारत म(cid:17) उन राoय * म(cid:17) सौर ऊजा 2 क(cid:25) संभाKय ता ह ै जहां पया2=त सूय 2 क(cid:25) रोशनी पड़ती ह,ै िवशेषकर राज8थ ान, गुजरात, आं(cid:127) <दशे , तिमलनाडु और ल(ाख। सौर संभाKय ता का एक मानिचRण उपलIध ह,ै िजसका उपयोग सौर <ित!ठ ान* क(cid:25) 8थ ापना के समय 4कया जाता ह।ै 4444....4444....3333 ससससौौौौरररर ऊऊऊऊजजजजाााा (cid:22)(cid:22) (cid:22)(cid:22)सससस ेे ेेििििववववIIIIततुुततुु –––– (cid:1)(cid:1)(cid:1)(cid:1)ौौौौIIIIोोोोििििगगगगकककक1111 ििििववववकककक++++पप पप सौर िव#ुत का आशय सूय 2 क(cid:25) ऊजा2 से उQप ा4दत िव#ुत ह।ै सूय2 के <काश को मुZय Nप स े दो <कार क(cid:25) <ौ#ोिग4कय* अथा2त फोटोवोjट ेक (पीवी) सेल और सोलर थम2ल या कंसं"े[टग सोलर पावर (सीएसपी) <ौ#ोिगक(cid:25) का <योग कर िव#ुत म(cid:17) िनbन ानुसार प3रवPतत 4कया जा सकता ह ै : (i) सोलर फोटोवोjट ेक पैनल (ii) सोलर थम2ल (सीएसपी और ही[टग) िजसम(cid:17) पैराबोिलक "फ, पावर टावर िडस िडजाइन और Œेशनेल 3रफलेdट र शािमल होते ह।O <Qय ेक <ौ#ोिगक(cid:25) के अपने गुणधम2, िवशेषताए ं और Rु3टयां होती ह।O अपनी आव)य कता और उपलIध इनपुट के आधार पर Cय ाियक िवकjप चुनने क(cid:25) आव)य कता होती ह।ै 4444....4444....4444 ससससोोोोललललरररर फफफफोोोोटटटटोोोोववववोोोो++++टट टट ेेककेेकक ((((पपपपीीीीववववीीीी)))) (cid:1)(cid:1)(cid:1)(cid:1)ौौौौIIIIोोोोििििगगगगकककक1111 सोलर सले अथवा फोटोवोjट ेक सेल एक ऐसा उपकरण ह ै जो फोटोवोjट ेक <भाव aारा सूय2 के <काश को सीध े िव#ुत म(cid:17) प3रवPतत करता ह।ै सेल* क(cid:25) असेbब ली का <योग सोलर पैनल, सोलर मॉŠूल अथवा फोटोवोjट ेक ऐरh तैयार करने के िलए 4कया जाता ह।ै सोलर सेल* को <ाय: िव#ुत संब(cid:23) होत े ह O और एक मॉŠूल के Nप म(cid:17) तैयार 4कए जाते ह।O फोटोवोjट ेक मॉŠूल* म(cid:17) <ाय: आगे क(cid:25) ओर (सन अप) कांच क(cid:25) एक सीट लगी होती ह ै जो <काश को गुजरन े क(cid:25) अनुमित <दान करती ह।ै साथ ही ब,त से तQव * (वषा2, बफ2बारी आ4द) से सेमीकंडdट र वेफर क(cid:25) र(cid:18)ा करता ह।ै सोलर सले सामाCय त: 4कसी भी मॉŠूल म(cid:17) Bमब(cid:23) ढंग से जुड़ े रहते ह O जो ऐडी3टव वोj टेज सृिजत करते ह।O य4द इन सेल* को समानांतर Nप से जोड़ा जाए तो संभवत: उzच कर(cid:17)ट <ा=त होगा। इसिलए मॉŠूल* को या तो Bमब(cid:23) से अथवा समानांतर Nप से अथवा दोन* Nप* म(cid:17) जोड़ा जाता है, िजससे 4क अपेि(cid:18)त पीक डीसी वोjट ेज कर(cid:17)ट के साथ 4कसी ऐरh का सजृ न 4कया जा सके। सौर ऊजा2 से उQप ा4दत िव#तु का Kय वहा3रक <योग सुिनिcत करने के िलए इस िव#ुत को <ाय: इनवट2र* (ि\ड से जुड़ी पीवी <णािलय*) का <योग करते ,ए िव#ुत ि\ड म(cid:17) फ(cid:25)ड 4कया जाता ह;ै एकांत <णािलय* म(cid:17) ऊजा2 के भंडारण हते ु बै3"य* का <योग 4कया जाता ह ै जो तQक ाल आव)य क नह(cid:7) होता। पीवी का <योग मुZय Nप से छोटे और म(cid:2)य म आकार वाले अन<ु योग* को िव#ुत <दान करने के िलए 4कया जाता है, इनका <योग एकल सोलर सेल¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 101 aारा िव#ुत <ा=त करन े वाले कjक ुलेटर स े लेकर 4कसी फोटो वोjट ेक ऐरh aारा िव#ुत <ा=त करन े वाले ऑफ – ि\ड होम म(cid:17) 4कया जाता ह।ै Kय ापक पैमाने पर उQप ादन के िलए सीएसपी =ल ांट मानक के Nप म(cid:17) 8थ ािपत 4कए गए ह।O हालां4क वत2मान म(cid:17) ब,-मेगावाट पीवी =ल ांट* क(cid:25) 8थ ापना सामाCय होती जा रही ह।ै मानक 4B8ट ेलाइन िसिलकॉन मॉŠूल जैस े नए िवकjप * म(cid:17) सॉइंग, पतली 4फjम (CdTe, जीआईजीएस, एमॉफ2स Si, माइBो4B8ट ेलाइन Si), कनेdट र मॉŠूल, िसjव र सले और सतत J<[टग <4BयाE के बजाय वेफर काJ8टग शािमल होती ह।ै िमतKय ियता मान के कारण सोलर पैनल* क(cid:25) लागत अपे(cid:18)ाकृत कम होती ह,ै इसिलए लोग इनका <योग करते ह O और अिधक माRा म(cid:17) इनक(cid:25) खरीद होती ह-ै िविनमा2ता मांग को पूरा करन े के िलए उQप ादन बढ़ा दते े ह।O उपयु2dत के म(ने जर ऐसी उbम ीद ह ै 4क आने वाले वषU म(cid:17) इनक(cid:25) लागत कम होती जाएगी। 4444....4444....5555 ससससोोोोललललरररर थथथथममममलल(cid:22)(cid:22)लल(cid:22)(cid:22) (cid:1)(cid:1)(cid:1)(cid:1)ौौौौIIIIोोोोििििगगगगकककक1111 इस <ौ#ोिगक(cid:25) म(cid:17) सौर ऊजा 2 को थम2ल ऊजा2 म(cid:17) प3रवPतत 4कया जाता ह,ै िजसे बाद म(cid:17) टबा2इन aारा िव#तु ऊजा 2 म(cid:17) प3रवPतत 4कया जाता ह ै िजसे बाद म(cid:17) टबा2इन aारा व#ै ुत ऊजा2 म(cid:17) प3रवPतत 4कया जाता ह।ै तीन थम2ल <ौ#ोिग4कय* अथा2त पाराबोिलक "ो, पावर टावर और िडश/इंजन क(cid:25) तुलना क(cid:25) िवशेषताए ं िनbन िलिखत ह ै: (cid:3) टावर और "ो तकनीक 30-200 मेगावाट आकार म(cid:17) ऐसे बड़ े और जुड़ े ि\ड सव„Qत र उपयुdत होत े ह O जहां िडश/इंजन <णािलयां मॉŠुलर होती ह O और इनका <योग एकल िडश अनु<योग* या डिश फामU म (cid:17) समूह बनाया जाता ह ै ता4क बड़ी ब,-मेगावाट प3रयोजनाए ं बनाई जा सक(cid:17) (cid:3) पैराबोिलक {ूज आज सबस े उपलIध प3रपdव सौर िव#ुत <ौ#ोिगक(cid:25) ह ै और इस <ौ#ोिगक(cid:25) का उपयोग िनकट अविध म(cid:17) िनयोजन के िलए <युdत 4कए जाने क(cid:25) संभावना ह।ै िस(cid:23) ,ई <ौ#ोिगक(cid:25) का <दश2न 4कया जाना ह ै और और कम लागत तैयार हो सकती है। (cid:3) िनकट भिव!य म(cid:17) केवल कम लागत वाल े और द(cid:18) थम2ल भंडारण सुिवधायुdत पावर टावर ही 8थ ािपत ह*गे जो <ेषणयो‚य , उzच (cid:18)मता घटक, सौर िव#तु के िलए इ8त ेमाल 4कए जा(cid:141)गे। हालां4क उनके <चालन और रखरखाव के िलए मोjट ेन-सॉjट <ौ#ोिगक(cid:25) <दPशत करने और कम लागत वाल े हिे लयो8ट ेट का िवकास आव)य क ह।ै (cid:3) िडश क(cid:25) मॉŠुलर <कृित उCह (cid:17) लघ,ु उzच मान अनु<योग* क(cid:25) अनुमित दते ी ह,ै तथािप िडश/इंजन <णािलय* के िलए कम से कम एक वािणिoयक इंजन िवकास क(cid:25) आव)य कता होती ह।ै (cid:3) टावर और डिश "ा टाइप क(cid:25) तुलना म (cid:17) कम लागत पर उzच तर सौर से िव#ुत (cid:18)मताए ं <ा=त करन े का अवसर <दान करते ह,O ले4कन अिनिcतता बनी रहती ह ै 4क dय ा इन <ौ#ोिग4कय* से आव)य क पूंजी लागत कटौती और उपलIध ता म(cid:17) सुधार लाया जा सकता ह।ै 4444....4444....6666 भभभभााााररररतततत मममम $$ $$ससससौौौौरररर ििििववववIIIIततततुुुु ककककेेेे ििििललललएएएए लललल(cid:19)(cid:19)(cid:19)(cid:19)यय यय एएएएवववव ंं ंंउउउउggggYYेेYYेे यय य य जेएनएनएसएम के अनुसार रा!" ीय सौर िमशन का उ()े य यथाशी… दशे म(cid:17) इसके <सार के िलए नीित प3रि8थितयां बनाकर भारत को सौर ऊजा2 म(cid:17) एक वैि]क नेतृQव के Nप म(cid:17) 8थ ािपत करना ह।ै यह िमशन 11व(cid:7) योजना क(cid:25) शेष अविध तथा 12व(cid:7) योजना के <थम वष 2 (2012-13 तक) चरण-। के Nप म (cid:17) 12व(cid:7) योजना के शेष 4 वष 2 (2013-17) चरण-।। के Nप म(cid:17) तथा 13व(cid:7) योजना चरण-।।। दिृ ~कोण अपनाएगा। <Qय के योजना के अंत म(cid:17) और 12व(cid:7) तथा 13व(cid:7) योजनाE क(cid:25) म(cid:2)य ाविध म(cid:17) बढ़ती ,ई लागत और <ौ#ोिगक Tख, घरेलू और वैि]क दोन* के आधार पर <गित का आकलन, बाद के चरण* के िलए (cid:18)मता और ल%य * क(cid:25) समी(cid:18)ा102 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] क(cid:25) जाएगी। इसका उ()े य यह ह ै 4क य4द अनुमो4दत लागत कम नह(cid:7) होती ह ै तथा आशा से अिधक लागत आन े पर आPथक सहायता से सरकार को बचाना होगा। िमशन का तQक ाल उ()े य दशे म(cid:17) केCf ीयकृत और िवकेCf ीकृत दोन* ही 8त र पर सौर <ौ#ोिगक(cid:25) लान े के िलए समथ2कारी पया2वरण क(cid:25) 8थ ापना करने पर (cid:2)य ान के केिCf त करना ह।ै <थम चरण (2013 तक) म(cid:17) सौर थम2ल म (cid:17) लो-हJO गग िवकjप * को अनाने; वािणिoयक ऊजा2 तक प,चं े िबना आबादी क(cid:25) सेवा के िलए आफ-ि\ड <णािलय* को बढ़ावा दने े और ि\ड आधा3रत <णािलय* म(cid:17) म(cid:2) यम (cid:18)मता वध2न पर (cid:2)य ान 4दया जाएगा। दसू रे चरण म(cid:17) <ारंिभक वषU के अनुभव को (cid:2)य ान म(cid:17) रखते ,ए दशे म(cid:17) ऊजा2 बढ़ाने और <ित8प ध(cid:12) सौर ऊजा2 म(cid:17) तेजी लाने के िलए (cid:18)मता म(cid:17) तेजी से वृि(cid:23) करनी होगी। इइइइसससस ेे ेे(cid:1)(cid:1)(cid:1)(cid:1)ाााा7777तत तत ककककररररनननन ेे ेे ककककेेेे ििििललललएएएए ििििममममशशशशनननन ककककेेेे लललल(cid:19)(cid:19)(cid:19)(cid:19)यय यय ििििननननhhhhनन नन ििििललललििििखखखखतततत हहहह dd dd:::: • 2022 तक 20,000 मेगावाट सौर ऊजा2 के िलए समथक2 ारी नीित ढांचा सृिजत करना • 2013 तक तीन वषU के अंदर 1000 मेगावाट ि\ड-कनेdट ेड सौर िव#तु उQप ादन क(cid:25) (cid:18)मता करना। वरीयता टै3रफ वाली िबजली कंपिनय* aारा नवीकरणीय खरीद बा(cid:2)य ता के अिनवाय 2 उपयोग के ज3रए 2017 तक अित3रdत 3000 मेगावाट (cid:18)मतावृि(cid:23)। यह (cid:18)मता दोगनु ी से अिधक हो सकती ह।ै 2017 तक 8थ ािपत ऊजा 2 10,000 मेगावाट तक प,चं सकती ह ै या बढ़ी ,ई तथा समPथत अंतरा2!" ीय िवQत और <ौ#ोिगक(cid:25) अंतरण पर आधा3रत इससे भी अिधक (cid:18)मता <ा=त क(cid:25) जा सकती ह।ै 20,000 मेगावाट क(cid:25) 2022 का महQव ाकां(cid:18)ी ल%य <थम दो चरण* के अनुभव पर िनभ2र होगा और सफल होने पर ि\ड <ित8प ध(cid:12) सौर िव#ुत क(cid:25) प3रि8थितयां हो सकती ह।O लेनदने को उपयुdत Nप से अंतरा2!" ीय िवQत तथा <ौ#ोिगक(cid:25) क(cid:25) उपलIध ता के आधार पर बढ़ाया जा सकता ह।ै • 8व दशे ी उQप ादन और िवपणन नेतृQव के िलए सौर िविनमा2ण (cid:18)मता िवशेषकर सौर थम2ल के िलए अनुकूल प3रि8थितयां पैदा करना। • 2017 तक 1000 मेगावाट और 2022 तक 2000 मेगावाट (cid:18)मता <ा=त करने के िलए ऑफ-ि\ड अनु<योग* k के काय2Bम* को बढ़ावा दने • 2017 तक 15 िमिलयन वग2 मीटर सौर थम2ल एकR (cid:18)Rे और 2022 तक 20 िमिलयन वग2 मीटर एकR (cid:18)ेR का ल%य <ा=त करना। • 2022 तक \ामीण (cid:18)ेR* के िलए 20 िमिलयन सौर लाइ[टग <णािलयां िनयोिजत करना।¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 103 4444....4444....7777 ििििममममशशशशनननन ररररणणणणननननीीीीिििितततत ((((चचचचररररणणणण----।।।। औऔऔऔरररर 2222)))) <थम चरण म(cid:17) 2022 तक रा!" ीय सौर िमशन के उ()े य <ा=त करने के िलए Kय ापक नीित ढांचो क(cid:25) घोषणा क(cid:25) जाएगी। नीित क(cid:25) घोषणा से अनुसंधान घरेलू िविनमाण2 और सौर िव#तु उQप ादन के िवकास म(cid:17) िनवेश के िलए उ#ोग* और डवे लेपर* को आकPषत करने के िलए आव)य क वातावरण बनेगा और इस <कार घरेल ू सौर उ#ोग के िलए महQव पूण2 प3रणाम <ा=त ह*गे। यह िमशन राoय सरकार*, िविनयामक*, िव#ुत कंपिनय* और 8थ ानीय 8व शासन िनकाय* के साथ घिन!ठ Nप से काय2 करेगा ता4क यह सुिनिcत हो सके 4क िनधा23रत 4कए जा रह े 4Bयाकलाप और नीित ढांच े को <भावी Nप से काया2िCवत 4कया जा सके। चूं4क कुछ राoय सरकार* ने सौर पर पहले ही पहल* क(cid:25) घोषणा कर दी ह,ै इसिलए िमशन शी… और आBामक शुTआत करन े के िलए एक उपयुdत पारगमन ढांचा तैयार करेगा। कककक.... ििििबबबबजजजजललललीीीी ककककंंंंपपपपििििननननयययय'''' सससस ेे ेेससससबबंंबबंं ििंंििंं धधधधतततत अअअअनननन(cid:1)(cid:1)ुु(cid:1)(cid:1)ुु ययययोोोोगगगग :::: ससससौौौौरररर ििििAAAAडडडड ककककाााा ििििननननममममााााणण(cid:22)(cid:22)णण(cid:22)(cid:22) ककककररररननननाााा सौर िव#तु को बढ़ावा दने े के िलए मुZय चालक िविश! ट सौर घटक के साथ िव#ुत कंपिनय* के िलए अिधदिे शत एक नवीकरणीय खरीद बा(cid:2)य ता (आरपीओ) के ज3रए होगा। सौर खरीद बा(cid:2)य ता को धीरे धीरे बढ़ाया जाएगा जब4क सौर िव#ुत खरीद के िलए िनधा23रत टै3रफ म(cid:17) आग े कमी आएगी। खखखख.... ििििननननhhhhनन नन 88880000°°°° सससस..$$..$$ चचचचननुुननुु ौौौौततततीीीी ---- ससससौौौौरररर एएएएककककKKKKककककतततताााा (cid:22)(cid:22)(cid:22)(cid:22) यह िमशन अपने <थम दो चरण* म(cid:17) सौर तापन <णािलय* को बढ़ावा दगे ा जो पहले ही <मािणत <ौ#ोिगक(cid:25) का इ8त ेमाल कर रह े ह O और वािणिoयक Nप से Kय वहाय2 ह।O यह िमशन यह सुिनिcत करने के िलए 4क अनु<योग, घरेलू तथा औ#ोिगक, 80 िड\ी स(cid:17). से नीचे सौरीकृत होते ह।O िमशन क(cid:25) मुZय रणनीित इस उ()े य को पूरा करन े के िलए जNरी नीित प3रवतन2 करेगा। • सबसे पहले िबJjडग बाईलॉज और रा!" ीय भवन कोड म (cid:17) शािमल करके सोलर हीटर* को अिनवाय2 बनाए।ं • दसू रा, <माणन और सौर ताप अनु<योग* के िविनमा2ण क(cid:25) रे[टग के िलए <भावी 4Bयािविध लागू करना, • तीसरा 8थ ानीय एज(cid:17)िसय* और िव#ुत कंपिनय* के ज3रए इन अलग अलग उपकरण* सुिवध ाजनक बनाना और बढ़ावा दने ा, तथा • चौथा, उzच तर (cid:18)मता <ा=त करने और लागत कम करके उदार ऋण दके र <ौ#ोिगक(cid:25) उCन यन और िविनमा2ण (cid:18)मता को सहायता <दान करना। गगगग.... ऑऑऑऑफफफफ ििििAAAAडडडड अअअअववववससससरररर –––– ििििववववIIIIततुुततुु सससस ेे ेेबबबबििंंििंं चचचचतततत गगगगररररीीीीबबबब'''' ककककेेेे घघघघरररर'''' मममम $$ $$ििििववववIIIIततुुततुु पपपपjjjjचचंंचचंं ााााननननाााा सौर िव#ुत के िलए एक मुZय अवसर िवकेCf ीकृत और आफ ि\ड अनु<योग* म(cid:17) िनिहत ह।ै दरू दराज के (cid:18)ेR* म (cid:17) जहां जहां ि\ड न तो Kय वहाय2 ह ै और न ही लागत <भावी वहां सौर ऊजा2 अनु<योग लागत <भावी होती ह,ै वे यह सुिन िcत करते ह O 4क िजन लोग* क(cid:25) प,चं रोशनी और िव#तु तक नह(cid:7) ह ै उCह (cid:17) िव#ुत उपलIध कराई जाए। मुZय सम8य ा उपयुdत सरकारी सहायता के ज3रए इन अनु<योग* म(cid:17) उzच शुTआती लागत के िलए अिधकतम िवQत ीय नीित <ा=त करना ह।ै इस समय बाजार आधा3रत और माइBो Bेिडट आधा3रत 8क (cid:25)म* ने इस (cid:18)ेR म(cid:17) j सीिमत बढ़त हािसल क(cid:25) ह।ै सरका ने िवQत ीय पहल* और संवध2नाQम क 8क (cid:25)म* के ज3रए िवकेिCfत अनु<योग* को बढ़ावा 4दया ह।ै य#िप, सौर िमशन ने 2017 तक के िलए 1000 मेगावाट का ल%य रखा ह ै जो छोटा <तीत होता हो, ले4कन लाख* घर* म(cid:17) यह प,चं कर प3रवतन2 लाएगा। नीित से <भावका3रता म(cid:17) सुधार के िलए िव#मान 8क (cid:25)म* पर नई 8क (cid:25)म* से सीखने को िमलेगा। इस िमशन का िनbन िलिखत उ()े य ह ै : • लगभग 10,000 गाव* एवं घर* को कवर करने के िलए नवीनीकरण ऊजा2 qोत मRं ालय के जारी दरू दराज के \ामीण िव#ुतीकरण काय2Bम के अंतग2त सौर <काश <णािलयां उपलIध कराना ह।ै रोशनी के उ()े य से सौर104 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] लाइट* के <योग को बि8तय* म(cid:17) ि\ड िबजली क(cid:25) प,चं के िबना बढ़ावा 4दया जाएगा और चूं4क अिधकतर बि8तयां दरू 8थ आ4दवासी बि8तयां ह,O इसिलए 90% आPथक सहायता क(cid:25) जाती ह।ै आPथक सहायता और सृिजत उQप ादन का इ8त ेमाल 8क ेल <माद के ज3रए 8व दशे ीकरण और क(cid:25)मत* को कम करने म(cid:17) 4कया जाएगा। अCय गांव* जो ि\ड से जुड़ े ह,O के िलए सौर ऊजा2 को िनbन लागत ऋण के <8त ाव के िलए बOक* aारा बाजार मोड के ज3रए बढ़ावा 4दया जाएगा। • ल(cid:18)aीप, अंडमान और िनकोबार aीप समूह, जbम ू और क)म ीर के सीमा (cid:18)ेR जैसे िवशेष }ेणी राoय * और दरू दराज के क3ठन प3रि8थित वाले राoय * म(cid:17) अकेल े सौर िव#ुत संयंR* क(cid:25) 8थ ापना करना। सीमांत (cid:18)ेR* को भी इसम(cid:17) शािमल 4कया जाएगा। अCय आफ ि\ड सौर अनु<योग* को भी <ोQस ािहत 4कया जाएगा। इसम(cid:17) डीजल और अCय जीवा)म nधन के , उपयोगaारा 4फलहाल पूरी क(cid:25) जा रही ह ै िव#ुत तापन और <शीतन ऊजा2 आव)य कताE को पूरा करने के िलए हाइि‰ड <णािलयां भी शािमल ह।O इन उपाय* म(cid:17) अभी बदलाव क(cid:25) आव)य कता ह ै ता4क लागत* म(cid:17) कमी लाई जा सके ले4कन मुZय चुनौती उ#िमय* के िलए बाजार िवकिसत करने हते ु समथ2कारी ढांचा और सहायता <दान करना ह।ै , , िव#ालय* और हो8ट ल* म(cid:17) पठन म(cid:17) सहायता करने कं=य ूटर* को चलान े म(cid:17) और ऊजा2 म(cid:2)य <दशे म(cid:17) वन* के बेहतर , , <बंधन म(cid:17) सहायता करने गुजरात म(cid:17) द‚ु ध <शीतन संयRं * म(cid:17) िबजली दने े झारखंड म(cid:17) तसर रीJलग म(cid:17) शािमल मिहला 8व -सहायता <बंधन नए (cid:18)ेR* के कुछ उदाहरण ह O िजन पर दशे म(cid:17) परी(cid:18)ण करने का <यास 4कया जा रहा ह।ै यह िमशन सौर ऊजा2 के ऐसे नवीन <योग* को बढ़ावा दने े के िलए 30% तक पजूं ी सहायता (जो कुछ समय बाद कम हो जाएगा) दने े पर िवचार 4कया जाएगा। बOक म(cid:17) िनरंतर Iय ाज बनाए रखने के उ()े य स े भारतीय नवीकरणीय ऊजा 2 िवकास एज(cid:17)सी (इरेडा) के ज3रए उदार पुन: िवQत दने े का <8त ाव ह,ै िजसके िलए सरकार बजटीय सहायता दगे ी। इसके बदले इरेडा एनएफबीसी और बOक* को इस शत2 पर पुनिवQत दगे ा 4क यह उपभोdत ा को अिधक से अिधक 5% Iय ाज दर पर उधार दगे ा, िजसका इ8त ेमाल दस वषU क(cid:25) अविध के िलए पुन: िवQत कायU के िलए 4कया जाएगा और अंत म(cid:17) यह िनिधया ं इरेडा को भिव!य म(cid:17) नवीकरणीय ऊजा2 प3रयोजनाE के िलए अंत3रत क(cid:25) गई मानी जाएगी। घघघघ.... ििििववववििििननननममममााााणण(cid:22)(cid:22)णण(cid:22)(cid:22) (cid:26)(cid:26)(cid:26)(cid:26)ममममततततााााएएएए ंं ंं:::: ननननववववोोोोददददभभभभवववव,,,, ििििवववव(cid:2)(cid:2)(cid:2)(cid:2)तत तत ाााारररर औऔऔऔरररर (cid:1)(cid:1)(cid:1)(cid:1)ससससाााारररर इस समय भारत का अिधकतर सौर उ#ोग िसिलकन वफे र सिहत महQव पूण2 कzच े माल के आयात पर िनभर2 ह।ै भारत को एक सौर ऊजा2 हब म(cid:17) बदलने म(cid:17) <णाली घटक* 4क संतुलन सिहत कम लागत, उzच गुणवQत ा म(cid:17) नेतृQव क(cid:25) भूिमका शािमल होगी। िसिलकन साम\ी के दशे म(cid:17) ही िनमा2ण सिहत पीवी िविनमा2ण संयंR* को बढ़ावा दने े के िलए िवशेष <ोQस ाहन पैकेज (एसआईपी) नीित का सकाराQम क काया2Cव यन आव)य क होगा। Cय ून तापमान सौर कलेdट र* का पहल े ही दशे म(cid:17) िविनमाण2 हो रहा ह ै तथािप C यून तापमान के िलए उCन त सौर कलेdट र* और म(cid:2)य म तथा उzच तापमान अनु<योग* के िलए सौर संक(cid:17)fण और उनके घटक* का सकं ेCf ण िविनमा2ण (cid:18)मताए ं बनान े क(cid:25) आव)य कता ह।ै एसआईपी के समान और थम2ल <णािलय*/उपाय* के िलए िविनमा2ण संयंR* क(cid:25) 8थ ापना करन े के िलए एक <ोQस ाहन पैकेज पर िवचार 4कया जा सकता ह।ै एसएमई (cid:18)ेR सौर <णािलय* के िलए िविभCन घटक* और <णािलय* के िविनमा2ण के िलए रीढ़ के Nप म(cid:17) ह।ै सुिवधाE का िव8त ार करन,े <ौ#ोिगक(cid:25) उCन यन और काय2शील पूंजी के िलए उदार ऋण दके र इसक(cid:25) सहायता क(cid:25) जाएगी। इरेडा इस सहायता को पुन: िवQत ऑपरेशन के ज3रए यह सहायता दगे ा। यह सुिनिcत 4कया जाए 4क <ौ#ोिगक(cid:25) अंतरण िवदशे ी qोत* स े सरकार और िनजी खरीद म(cid:17) क(cid:25) जाती ह।ै डडडड.... ससससौौौौरररर भभभभााााररररतततत ककककेेेे ििििललललएएएए अअअअननननससससुुुु धधधधंंंं ाााानननन औऔऔऔरररर ििििववववककककाााासससस :::: अअअअननननससुुससुु धधंंधधंं ाााानननन औऔऔऔरररर अअअअनननन(cid:1)(cid:1)ुु(cid:1)(cid:1)ुु ययययोोोोगगगग ककककेेेे ििििललललएएएए पपपप////ररररिििि(cid:2)(cid:2)(cid:2)(cid:2)थथथथििििततततययययाााा ंं ंंपपपपददैैददैै ाााा ककककररररननननाााा <मुख आर एडं डी पहल म(cid:17) इन पर (cid:2)य ान केिCfत 4कया जाता ह ै : सबसे पहले िव#मान सामि\य*, उपकरण* और अनु<योग* म(cid:17) (cid:18)मता सुधार तथा शेष <णािलय* क(cid:25) लागत म(cid:17) कमी करन े पर, एक(cid:25)करण और सव„Qत म से संबंिधत¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 105 मामल* का समाधान करके नए अनु<योग करने पर; दसू रा लागत <भावी भंडारण <ौ#ोिग4कयां िवकिसत करन े पर जो प3रवतन2 शील और भंडारण बाधाE, दोन* का समाधान करेगा तथा बेहतर सांfक* के उपयोग के aारा 8थ ान सघनता पर लि(cid:18)त करन,े नैनो-<ौ#ोिगक(cid:25) के अनु<योग तथा बेहतर सामि\य* का उपयोग। यह िमशन <ौ#ोिगक(cid:25) तट8थ होगा जो <ौ#ोिगक(cid:25) िवजेताE का िनधा2रण करने के िलए <ौ#ोिगक(cid:25)य नवोदभव और बाजार प3रि8थितय* क(cid:25) अनुमित दगे ा। जारी प3रयोजनाE, अनुसंधान (cid:18)मताE तथा ससं ाधन* क(cid:25) उपलIध ता और अंतरा2!" ीय सहयोग क(cid:25) सभं ावनाE को (cid:2)य ान म(cid:17) रखते ,ए रणनीित का सवh(cid:18)ण करने के िलए एक सौर अनुसंधान प3रषद क(cid:25) 8थ ापना क(cid:25) जाएगी। अनुपयुdत और आर एडं डी दोन* सेdट र* के िलए िव8त ा3रत और बड़ा सौर ऊजा2 काय2Bम को सहायता दने े के िलए कौशल }ृंखला पर एक महQव ाकां(cid:18)ी मानव संसाधन िवकास कायB2 म तैयार 4कया जाएगा। चरण-। म(cid:17) िमशन के दीघ2कालीन आर एडं डी तथा एचआरडी योजना के भाग के Nप म(cid:17) िविभCन सौर ऊजा2 <ौ#ोिग4कय* पर <िश(cid:18)ण <ा=त करने के िलए कम से कम 1000 युवा वैwािनक* और इंजीिनयर* को <ोQस ाहन 4दय ा जाएगा। <ौ#ोिगक(cid:25) िवकास और लागत कटौती को बढ़ावा दने े के िलए <ायोिगक <दश2न प3रयोजनाE को िमशन क(cid:25) आर एडं डी <ाथिमकताE के साथ घिन!ठ Nप से जोड़ा जाएगा, अत: िमशन म(cid:17) नवीकरणीय ऊजा2 qोत मंRालय: aारा पहले ही शुN क(cid:25) गई प3रयोजनाE और कॉरपोरेट िनवेशक* aारा 8थ ािपत क(cid:25) जाने वाली प3रयोजनाE के अित3रdत चरण-। म(cid:17) िनbन िलिखत <दश2न प3रयोजनाE को 8थ ािपत करने क(cid:25) प3रकjप ना क(cid:25) गई ह।ै 1. 4-6 घंटे क(cid:25) भंडारण (cid:18)मता वाला 50-100 मेगावाट सौर थम2ल संयंR (जो सुबह और सायंकाल के Kय 8त समय क(cid:25) पूPत कर सके)। A 2. एक 100 मेगावाट पेराबोिलक Ž <ौ#ोिगक(cid:25) आधा3रत सौर थम2ल संयंR 3. प3रवत2नशील एवं 8थ ान क(cid:25) 4दdक त* के समाधान के िलए कोयला, गैस या बायोमास के साथ 100-150 मेगावाट हाइिबड संयंR। 4. व(cid:143)कग |लूड तथा अCय उभरती ,ई <ौ#ोिग4कय* के Nप म(cid:17) मोjट ेन साjट /8ट ीम के साथ/उसके िबना स(cid:17)"ल 3रसीवर <ौ#ोिगक(cid:25) पर आधा3रत 20-50 मेगावाट सौर संयंR। izfr 5. नेट मीट[रग वाले चुJनदा सरकारी भवन* एवं !ठ ान* पर ि\ड से जुड़ी Nफ-टाप पीवी <णािलयां 6. 4दन के समय और \ी!म कालीन Kय 8त समय भार क(cid:25) पूPत के िलए सौर आधा3रत 8प से -कूJलग और <शीतन A <णािलयां ऊपर वPणत िवCय ास और (cid:18)मताए ं संकेताQम क ह O और िविभCन 8ट ेकहोjड र* के साथ परामश2 करने के बाद िनिcत क(cid:25) जाएगी। सौर िव#तु <दश2न संयंR* क(cid:25) 8थ ापना के िलए बोली <4Bया अपनाई जाएगी िजससे सौर िव#ुत के िलए टै3रफ िनधा23रत करने हते ु बेहतर मूल य् <ािx म(cid:17) मदद िमलेगी। यह सुिनिcत 4कया जाएगा 4क 8व दशे ी घटक अिधक स े अिधक हो। बोली द8त ावेज* म(cid:17) <ौ#ोिगक(cid:25) अंतरण खंड भी होगा। आशा ह ै 4क इन संयंR* क(cid:25) 8थ ापना 12व(cid:7) योजना अविध म(cid:17) क(cid:25) जाएगी। 4444....4444....8888 (cid:1)(cid:1)(cid:1)(cid:1)(cid:2)(cid:2)(cid:2)(cid:2)तत तत ााााििििववववतततत ररररोोोोडडडडममममपपैैपपैै ि\ड से जुड़ी तथा िवत3रत और वािणिoयक ऊजा2 सेवाE का आफ-ि\ड <ावधान के िलए सौर उQप ा4दत िव#तु को Kय ापक 8त र पर िनयोिजत करन े क(cid:25) इzछ ा ह।ै अनु<योग सेगम(cid:17)ट* म(cid:17) िनयोजन क(cid:25) प3रकjप ना क(cid:25) गई ह ै जैसा 4क नीच े तािलका 4-9 म(cid:17) दशा2या गया ह ै :106 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ततततााााििििललललककककाााा 4444....9999 B. अनु<योग सेगम(cid:17)ट चरण-I के िलए ल%य चरण-II के िलए ल%य चरण-III के िलए ल%य सं. (2010-13) (2013-17) (2017-22) 1. सौर कलेdट र 7 िमिलयन वग2मीटर 15 िमिलयन वग2मीटर 20 िमिलयन वग2मीटर 2. ऑफ ि\ड सौर अनु<योग 200 मेगावाट 1000 मेगावाट 2000 मेगावाट 3. Nफ टाप सिहत यु3टिलटी 1,000-2000 मेगावाट 4000-10,000 20000 मेगावाट ि\ड िव#ुत मेगावाट 4444....4444....9999.... ननननीीीीििििततततगगगगतततत औऔऔऔरररर ििििववववििििननननययययााााममममकककक ढढढढााााचचंंचचंं ाााा इस िमशन का उ()े य नीित और िविनयामक पया2वरण सृिजत करना ह ै जो एक पूव2 िनधा23रत ढांचा <दान करता ह ै िजससे सौर ऊजा2 अनु<योग* म(cid:17) तेजी स े और अिधक पूंजीगत िनवेश होता ह ै और तकनीक(cid:25) नवोदभव और लागत कम करने को बढ़ावा िमलता ह।ै य#िप आगे चलकर यह िमशन कम समय म (cid:17) सौर िव#ुत के िवकास के िलए (cid:18)ेR िविश!ट कानूनी और िविनयामक ढांचे क(cid:25) 8थ ापना करेगा 4फर भी िव#ुत अिधिनयम, 2003 के िव#मान ढांचे के अंतग2त िमशन के 4Bयाकलाप* को िनधा32 रत करना आव)य क होगा। िव#ुत अिधिनयम म(cid:17) पहले ही नवीकरणीय क(cid:25) भूिमका <दQत ह,ै ले4कन िमशन के अंतग2त गितिविधय* क(cid:25) माRा और महQव को दखे ते ,ए िविश!ट संशोधन करना आव)य क होगा। रा!" ीय टै3रफ नीित, 2006 म(cid:17) राoय िबजली िविनयामक आयोग* (एसईआरसी) के िलए ऊजा2 के नवीकरणीय izfr'kr qोत* स े ऊजा2 का Cय ूनतम खरीदना िनधा23रत ह।ै इसम(cid:17) (cid:18)ेR म(cid:17) ऐसे संसाधन* क(cid:25) उपलIध ता और खुदरा टै3रफ पर इसके <भाव को (cid:2)य ान म(cid:17) रखा जाएगा। रा!" ीय टै3रफ नीित, 2006 म(cid:17) यह अिधदिे शत करने के िलए संशोधन 4कया जाएगा 4क राoय िव#ुत िविनयामक सौर िव#ुत क(cid:25) खरीद के िलए <ितशत िनधा32 रत करे। राoय * के िलए सौर िव#तु खरीद बा(cid:2)य ता चरण-। म(cid:17) 0.25% से शुN होकर 2022 तक 3% तक हो सकती ह।ै यह िविश!ट नवीकरणीय ऊजा2 <माण (आरईसी) तंR के साथ िबजली कंपिनय* और सौर िव#ुत उQप ादन कंपिनय* को अपनी सौर िव#ुत खरीद बा(cid:2)य ताE को पूराकरने क(cid:25) अनुमित <ा=त होगी। केCf ीय िव#ुत िविनयामक आयोग ने वत2मान लागत और <ौ#ोिगक(cid:25) चलन को (cid:2)य ान म(cid:17) रखते ,ए सौर िव#ुत क(cid:25) खरीद के िलए फ(cid:25)ड-इन-टै3रफ के िनधार2 ण के िलए हाल ही म(cid:17) 4दशािनदशh जारी 4कए ह।O सीईआरसी न े यह भी शत2 रखी ह ै 4क िव#तु खरीद करार जो िबजली कंपिनयां सौर िव#ुत <मोटर* के साथ कर(cid:17)गी। 25 वष2 क(cid:25) अविध के िलए 4कया जाएगा। ’’ , ''सोलर इंिडया को शी… शुN करने और इसम(cid:17) तेजी लाने को बढ़ावा दने े के उ()े य से िव#तु मंRालय एनटीपीसी और केCf ीय िव#तु <ािधकरण के सहयोग स े एक योजना शुN क(cid:25) जा रही ह।ै सीधे तौर पर सौर िव#ुत क(cid:25) ऑफ- टेक होगी और सरकार पर िवQत ीय भार Cय ूनतम करेगी। , कई िनवेशक सौर आधा3रत िव#ुत संयंR* क(cid:25) 8थ ापना करन े के इzछ ुक ह।O तथािप आईपीसी aारा िबजली क(cid:25) िबB(cid:25) िबजली क(cid:25) उzच लागत और िवतरण कंपिनय* से टै3रफ वसूली के कारण एक मु(ा हो सकता ह।ै अिधक संZय ा म(cid:17) सौर िव#ुत प3रयोजनाE क(cid:25) 8थ ापना के िलए <ोQस ाहन दने े के उ()े य से टै3रफ पर <भाव को Cय ूनतम करते समय िविभCन िवकjप * का पता लगाया गया था। एक िवकjप केCf ीय 8ट ेशन* के स8त े आवं3टत न 4कए गए कोटा म(cid:17) से िबजली सिहत सौर िव#ुत को बडं ल करना और इस बंडल िव#ुत को सीईआरसी aारा िनयंिRत क(cid:25)मत पर राoय िवतरण िबजली कंपिनय* को बेचना ह।ै बंडJलग के <योजन के िलए िव#ुत खरीद¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 107 4कसी िनगम aारा क(cid:25) जानी ह ै और राoय िव#ुत िवतरण कंपिनय* को पुन: िबB(cid:25) क(cid:25) जानी ह।ै इस <कार का काय2 िव#मान सांिविधक उपबंध* के अनुसार 4कसी "ेJडग कंपनी/िड8क ॉम aारा 4कया जा सकता ह।ै एनटीपीसी के पास िव#ुत क(cid:25) "ेJडग के Kय वसाय म(cid:17) लगी एनटीपीसी िव#ुत Kय ापार िनगम िलिमटेड (एनवीवीएन) नामक पूण2 8व ािमQव वाली एक सहायक कंपनी ह।ै सौर िव#ुत डवे लेपर* के साथ िव#ुत खरीद करार करने के िलए एनवीवीएन को िव#ुत मंRालय aारा एक नोडल एज(cid:17)सी के Nप म(cid:17) नामो4द!ट 4कया जाएगा। पीपीए पर उन डवे लेपर* के साथ ह8त ा(cid:18)र 4कए जाएगं े जो सौर प3रयोजनाE क(cid:25) 8 थापना करे जा रह े ह O और ि\ड से 33 4कलोवोjट 8त र और उसस े अिधक जुड़ े ह।O पीपीए 5 वषU क(cid:25) अविध के िलए वैध होगा। <ित मेगावाट सौर िव#ुत 8थ ािपत (cid:18)मता िजसके िलए एनवीवीएन aारा ह8त ा(cid:18)र 4कए गए ह,O के िलए एनटीपीसी 8ट ेशन* के आवं3टत न 4कए गए कोटे िव#ुत मंRालय उतने ही मेगावाट (cid:18)मता आवं3टत करेगा। एनवीवीएन इस िबजली को बंडल करेगा और इस बंडल िबजली को सीईआरसी िवनायमक* aारा िनिcत पर बनेगा। बाजार दर म(cid:17) मूjय काफ(cid:25) उतार चढ़ाव होन े के मामले म(cid:17) सरकार ि8थित क(cid:25) समी(cid:18)ा करेगा। जब एनवीवीएन संग3ठत िबजली क(cid:25) आपूPत िवतरण िबजली कंपिनय* को करेगी, तो वे िबजली िवतरण कंपिनया ं िविनयामक <ािधकरण* aारा िनधा23रत 4कए अनुसार अपने आरपीओ क(cid:25) पूPत के िलए संग3ठत िबजली के एक fn'kk भाग का उपयोग करने के िलए हकदार ह*गी। इस बारे म(cid:17) सीईआरसी उपयुdत िनदशh जारी कर सकता ह।ै <थम चरण के अंत म(cid:17) और सौर िव#ुत को समािव!ट करने के िलए <दPशत इzछ ुक <मािणत िवQत ीय ि8थित वाली अzछ ा िन!प ादन कर रही िबजली कंपिनय* को इस योजना म(cid:17) शािमल 4कया जाएगा य4द इसे चरण-।। म (cid:17) िव8त ा3रत करने का िनण2य 4कया गया हो। इस योजना के अंतग2त सौर िव#ुत प3रयोजनाE के िवकास क(cid:25) मांग करते समय चरणब(cid:23) Nप से 8व दशे ीकरण क(cid:25) आव)य कता का िवशेष Nप से उjल ेख 4कया जाएगा ता4क चरणब(cid:23) Nप से 8व दशे ीकरण को K यवहाय 2 बनाया जा सके। मुZय घटक* और सेगम(cid:17)ट के टै3रफ और कर का उपयुdत Nप से िनधा2रण 4कया जाएगा ता4क 8व दशे ीकरण क(cid:25) <4Bया को बढ़ावा 4दया जा सके। परंपरागत िव#ुत और डीजल आधा3रत जनरेटर* को बदलने के िलए यह िमशन Nफ टाप सौर पीवी और एलटी/11 के वी, ि\ड से जुड़ े अCय सौर िव#तु संयंR* को <ोQस ाहन दगे ा। सौरपीवी Nफ टॉप उपकरण* के ऑपरेटर क(cid:25) ऑपरेटर aारा क(cid:25) गई सौर िव#ुत खपत और ि\ड म(cid:17) प,चं ाई गई सौर िव#ुत दोन* पर सीईआरसी aारा िनधा23रत फ(cid:25)ड-इन-टै3रफ <ा=त करन े के पाR ह*ग।े िबजली कंपिनया ं खपत क(cid:25) गई परंपरागत िबजली और ि\ड म(cid:17) प,चं ाई गई िबजली, जो भी लागू हो, पर कुल बचत के िलए डिे बट/Bेिडट कर(cid:17)गी। सीईआरसी aारा िनधा23रत सौर टै3रफ 5.50/केडIj य ूएच 3% <ित वष2 वृि(cid:23) सिहत के बसे मूjय के बीच के अंतर घाटे को पाटने के िलए िबजली कंपिनय* को उQप ादन आधा3रत <ोQस ाहन 4दया जाएगा। िबजली कंपनी और Nफ टाप पीवी ऑपरेटर के बीच राoय सरकार* को (cid:18)मता सजृ न सुिवधाजनक सुिनिcत करन े के िलए िबजली कंपिनय* के संयंR 8थ ािपत करने के िलए समPपत अवसंरचना के साथ सौर उQप ादन को बढ़ावा दने े को भी <ोQस ािहत 4कया जाएगा। ििििववववNNNNतत तत ीीीीयययय (cid:1)(cid:1)(cid:1)(cid:1)ोोोोNNNNसस सस ााााहहहहनननन यह भी िसफा3रश क(cid:25) जाती ह ै 4क िवशेष पूंजीगत उप8 कर*, 4B3टकल साम\ी, संघटक* और प3रयोजना संबंधी आयात के िलए सीमा शुjक और उQप ाद शुjक म(cid:17) छूट <दान क(cid:25) जाए । 4.4.10भभभभााााररररतततत मममम $$ $$ससससौौौौरररर ििििववववििििननननममममााााणण(cid:22)(cid:22)णण(cid:22)(cid:22) एक िमशन उ()े य अ\णी सौर <ौ#ोिग4कय* और 2020 तक 8थ ािपत (cid:18)मता के 45 जीडIj य ू समतुjय ल%य के सौर िविनमा2ण (मान }ृंखला के आर-पार) म(cid:17) वैि]क नेतृQव क(cid:25) भूिमका लेना ह,ै िजसम(cid:17) <ित वष2 लगभग 2 जीडIj य ू (cid:18)मता सौर सेल बनान े के िलए पोली िसिलकान साम\ी के िलए समPथत िविनमा2ण (cid:18)मता क(cid:25) 8थ ापना करना भी शािमल ह।ै भारत के पास पहले ही लगभग 700 मेगावाट क(cid:25) पीवी मॉŠूल िविनमा2ण (cid:18)मता ह,ै िजसम(cid:17) अगले कुछ वषU म(cid:17) विृ (cid:23) होन े क(cid:25) संभावना ह।ै िसिलकान साम\ी के िविनमा2ण के िलए वत2मान 8व दशे ी (cid:18)मता क(cid:25) संभावना ह।ै िसिलकान साम\ी के िविनमा2ण के िलए वत2मान 8व दशे ी (cid:18)मता क(cid:25) संभावना ह।ै िसिलकान साम\ी के िविनमा2ण के िलए वत2मान 8व दशे ी (cid:18)मता ब,त कम ह;ै तथािप, साव2जिनक और िनजी (cid:18)ेR108 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] म(cid:17) कुछ संयंR* क(cid:25) 8थ ापना 4कए जाने क(cid:25) संभावना ह।ै इस सम\, सौर थम2ल िव#ुत प3रयोजनाE के िलए कोई 8व दशे ी (cid:18)मता नह(cid:7) ह,ै इसिलए सौर थम2ल िव#ुत सयं ंR* क(cid:25) मांग को पूरा करने के िलए कं8" ेटर कलेdट स2, 3रसीवस2 और अCय घटक* के िविनमा2ण के िलए नई सुिवधाE क(cid:25) आव)य कता पड़गे ी। 8थ ािपत (cid:18)मता ल%य को <ा=त करने के िलए िमशन िनbन िलिखत िसफा3रश करता ह:ै • (cid:2)(cid:2)(cid:2)(cid:2)थथ थथ ााााननननीीीीयययय ममममाााागगंंगगंं ससससजजृृजजृृ नननन : सौर उQप ादन और बड़ े सरकारी <ायोिगक/कायB2 म* के िलए उिचत <ोQस ाहन aारा समPथत 20 जीडIj य ू योजना से सौर उQप ादन के िलए भारतीय बाजार को आकPषत करेगा। • ििििववववNNNNतत तत पपपपोोोोषषषषणणणण औऔऔऔरररर (cid:1)(cid:1)(cid:1)(cid:1)ोोोोNNNNसस सस ााााहहहहनननन : सेज जैसे <ोQस ाहन िविनमा2ण पाकU को <दान 4कए जाए ं िजसम(cid:17) िनbन िलिखत शािमल ह O : (cid:1) पूंजीगत उपकरण*, कzच े माल पर शूCय आयात शुjक और उQप ादन शुjक म(cid:17) छूट, (cid:1) कम Iय ाज दर पर ऋण, <ाथिमक (cid:18)ेR ल(cid:17)Jडग (cid:1) एक(cid:25)कृत िविनमा2ण संयंR* क(cid:25) 8थ ापना के िलए िवशेष <ोQस ाहन पैकेज (िस=स ) के अंतग2त <ोQस ाहन; (i) पोली िसिलकान साम\ी से सौर माŠूल तक; और (ii) पतली 4फल आधा3रत मॉŠूल िविनमा2ण संयंR। सूचना <ौ#ोिगक(cid:25) िवभाग क(cid:25) िसप योजना के अंतग2त सौर फोटोवोjट ेक के डोमेन म(cid:17) 15 आवेदन ह,O िजनम (cid:17) सेल िविनमा2ण (4B8ट ेिलन और पतली 4फjम दोन*) और अCय * के साथ साथ पोली-िसिलकान शािमल ह।O इन 15 कंपिनय* aारा अनमु ािनत िमि}त (cid:18)मता से वष2 2022 तक 8-10 जीडIj य ू सौर िव#ुत का उQप ादन होगा जो िनया2त के प3रकलन के बाद भी िमशन के ल%य * को पूरा करने के िलए पया2=त होगा। (cid:1) उzच मानक सुिनिcत करने के िलए ऊजा2 काय2कुशलता Iय ूरो के 8ट ार रे[टग काय2Bम के अंतग2त सौर घटक* को शािमल करने क(cid:25) िसफा3रश भी क(cid:25) जाती ह।ै सीएसपी <णािलय* और उनके घटक* के िविनमा2ण के िलए इसी तरह के <ोQस ाहन* क(cid:25) आव)य कता होगी। दशे म (cid:17) सोलर थम2ल िविनमा2ण को बढ़ावा दने े के िलए नीित बनाने हते ु एक सिमित ग3ठत क(cid:25) जाए। • TTTTयय यय ववववससससाााायययय ककककररररनननन ेेेे कककक1111 ससससगगुुगगुु ममममतततताााा: राoय * के परामश2 से सभी संबंिधत अनुमितय* के िलए एकल िखड़क(cid:25) मंजूरी तैयार करना। • अअअअववववससससररंंररंं चचचचननननाााा औऔऔऔरररर पपपपाााा////ररररिििि(cid:2)(cid:2)(cid:2)(cid:2)थथथथििििततततकककक1111 (cid:1)(cid:1)(cid:1)(cid:1)णणणणााााललललीीीी इइइइननननबबेेबबेे ललललरररर : 2-3 बड़ े सौर िविनमा2ण तकनीक(cid:25) पाक2 तैयार करना िजसम(cid:17) िविनमा2ण इकाइयां (सौर मान }ृंखला म(cid:17)), आवास, काया2लय तथा अनुसंधान सं8थ ान शािमल ह*गे। ये 24x7 िव#ुत और जल आपूPत कर(cid:17)गे और इCह (cid:17) उन बड़ े शहरी केCf * के आसपास अवि8थत 4कया जाएगा जो बंदरगाह* और एयर पोट2 आ4द से बेहतर ढंग स े जुड़ े ह O िजससे 4क यह सुिनिcत 4कया जा सके 4क आयाितत कzच ा माल और उzच गुणवQत ा युdत इंजीिनय[रग <ितभाए ं उCह (cid:17) तजे ी से सुलभ कराई जा सक(cid:17)। 4444....4444....11111111 अअअअननननससुुससुु धधंंधधंं ाााानननन औऔऔऔरररर ििििववववककककाााासससस यह िमशन सौर ऊजा2 के (cid:18)Rे म(cid:17) बड़ा अनुसंधान और िवकास काय2Bम शुN करेगा, जो मौजूदा अनु<योग* क(cid:25) द(cid:18)ता म(cid:17) सुधार करन,े शेष संयंR <णािलय* क(cid:25) लागत कम करने, हाइि‰ड सह-उQप ादन का परी(cid:18)ण करन े और प3रवत2नीय बाधाE, 8थ ान क(cid:25) उपलIध ता तथा सुिवधाजनक एवं लागत <भावी भडं ारण क(cid:25) कमी जैसी बाधाE को दरू करने पर (cid:2)य ान आकृ ! ट करेगा। अनुसंधान और िवकास रणनीित म(cid:17) 5 वगU को शािमल करत े ,ए कार2वाई क(cid:25) जाएगी अथा2त i) नई साम\ी <4Bया और अनु<योग* के नवोदभव और िवकास के िलए संभािवत दीघ2कािलक आधारभूत अनसु ंधान, ii) <णािलय*/उपकरण* के िन!प ादन, 8थ ाियQव तथा लागत <ित8प धा2 म(cid:17) सुधार के िलए मौजूदा <4BयाE, साम\ी और <ौ#ोिगक(cid:25) को उCन त बनाने के उ()े य से अनु<युdत अनुसंधान, iii) िन!प ादन, <चालनीयता और लागत पर फ(cid:25)डबैक <ा=त करने के िलए हाइि‰ड के साथ साथ पारंप3रक िव#ुत <णािलय* के अलग अलग िवCय ास का (cid:18)ेRीय मूjय ांकन करने के उ()े य से <ौ#ोिगक(cid:25) वैधीकरण और <दश2न प3रयोजनाएं, iv) पीपीपी मोड म(cid:17)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 109 अनुसंधान और िवकास अवसंरचना का िवकास, और v) उदभव (इनdय ूबेशन) और <ारंभ करने (8ट ाट2-अप) के िलए सहायता। आर एडं ई नीित क(cid:25) सहायता के िलए िमशन म(cid:17) िनbन िलिखत शािमल हो सकते ह O : - सम\ <ौ#ोिगक(cid:25) नीित के माग2दश2न हते ु एक उzच 8त रीय अनुसंधान प3रषद क(cid:25) 8थ ापना करना, िजसम (cid:17) िवZय ात वैwािनक, तकनीक(cid:25) िवशेषw और शैि(cid:18)क तथा अनुसंधान सं8थ ान*, उ#ोग* सरकार और िसिवल सोसाइटी के <ितिनिध शािमल ह*गे। प3रषद अपने काय2 म(cid:17) सहायता के िलए इस (cid:18)ेR म(cid:17) िवZय ात अंतरा2!" ीय िवशेषw* को आमंिRत कर सकती ह।ै अिधक Qव 3रत <ौ#ोिगक(cid:25)य नवोदभव और लागत म(cid:17) कमी लाने के िलए प3रषद <ौ#ोिगक(cid:25) रोडमैप क(cid:25) समी(cid:18)ा और अ#तन करेगी। - अनुसंधान प3रषद aारा <ितपा4दत <ौ#ोिगक(cid:25) िवकास योजना के काया2Cव यन के िलए एक रा!" ीय उQक ृ!ट ता केCf क(cid:25) 8थ ापना क(cid:25) जाएगी जो इसके सिचवालय म(cid:17) Nप म(cid:17) काय 2 करेगा। यह िविभCन आर एडं डी केCf * के काय2 को समCव य करेगा, अनसु ंधान िन!क षU क(cid:25) वैधता करेगा और सौर उ#ोग के िलए मानक और िविनदशh न िवकिसत करने के िलए जांच और <माणन हते ु एक शीष2 केCf के Nप म (cid:17) काम करेगा। यह प3रकjप ना क(cid:25) गई ह ै 4क नवीकरणीय ऊजा2 qोत मंRालय का सौर ऊजा 2 केCf रा!" ीय उQक ृ!ट ता केCf का िह8स ा बनेगा। - रा!" ीय उQक ृ!ट ता केCf के साथ समCव य करके यह अनसु धं ान प3रषद और आरएडं डी क(cid:25) िव#मान सं8थ ागत (cid:18)मताE क(cid:25) सूची बनाएगा और उQक ृ!ट ता केCf * का एक नेटवक2 8थ ािपत करेगा। <Qय ेक केCf अपनी <मािणक (cid:18)मता के आर एडं डी (cid:18)ेR पर (cid:2)य ान दगे ा। ये केCf अनसु ंधान सं8थ ान*, शैि(cid:18)क सं8थ ाE या िनजी (cid:18)ेR क(cid:25) कंपिनय* म(cid:17) भी 8थ ािपत हो सकते ह।O इCह (cid:17) सौर <ौ#ोिगक(cid:25) िवकास योजना के िविभCन घटक* के िलए बोली के िलए <ोQस ािहत 4कया जाएगा और <मािणत (cid:18)मता के साथ िवदशे ी सहयोग सिहत अCय सं8 थाE के साथ सहयोग करके सहयोगाQम क दिृ ~कोण अपना सकते ह।O - एनसीई िवदशे ी आर एडं डी सं8थ ाE और उzच तकनीक वाली कंपिनय* सिहत िविभCन उQक ृ!ट ता केCf * म (cid:17) नेटव(cid:143)कग के िलए एक रा!" ीय =ल ेटफाम2 <दान करेगा। - एनसीई िन!प ादन से जुड़ े सौर आर एडं डी कायB2 म* क(cid:25) सहायता के िलए फंJडग एज(cid:17)सी के Nप म(cid:17) काय2 करेगा। इसम(cid:17) िमशन उ()े य के संगत (cid:18)ेR* म(cid:17) पायलट <दश2न प3रयोजनाE का िनिधयन या सह-िनिधयन शािमल होगा। िनिधयन पया=2 त , पूवा2नुमान के अनुNप और 5-10 वष2 क(cid:25) अविध तक के िलए होना चािहए। - एनसीई अंतरा2!" ीय अनुसंधान सं8थ ान*, िवदशे * के अनुसंधान समूह*, हाईटेक 8ट ा"-अप कंपिनय* और ब,- उ()े य ीय काय2Bम* (जैसे व े जो यूएनएफसीसीसी के अतं ग2त वत2मान बातचीत स े उभरे ह*), के साथ मुZय अंतरा2पृ!ठ होगा। h - एनसीई, आईएमडी, इसरो और अCय संबंिधत एजि(cid:17) सय* के साथ समCव य करेगा, जम नी 8त र या रोधन िवशेषकर दशे के उzच संभािवत सौर (cid:18)ेR* म(cid:17) िव8त तृ मानिचRण के साथ अCय एज(cid:17)िसय* के साथ सहयोग करेगा। सही और िव)व सनीय आंकड़ े सभी सौर अनु<योग* िवशेषकर संकेिCfत सौर िव#ुत (सीएसपी) के िलए एक महQव पूण2 अपे(cid:18)ा ह।ै - सौर <ौ#ोिगक(cid:25) िवकास योजना तैयार करन े म(cid:17) अनुसंधान प3रषद नवीकरणीय ऊजा2 qोत मंRालय, िवwान और <ौ#ोिगक(cid:25) िवभाग, पृ(cid:129)व ी िवwान मंRालय और अC य एज(cid:17)िसय* तथा सं8थ ाE क(cid:25) चल रही और <8त ािवत पहल* क(cid:25) समी(cid:18)ा करेगा और उCह (cid:17) उपयुdत समझे जान े पर अपनी योजना म(cid:17) शािमल करेगा। उदभवन और 8ट ाट2-अप को सहायता <दान करने के उ()े य से िमशन िनगरानी, नेटव(cid:143)कग और िवQत ीय सहायता के ज3रए सौर ऊजा2 8ट ाट2 अप और एसएमई को शािमल करने के िलए आईआईएम, अहमदाबाद म(cid:17) ि8थत इनोवेशन केCf , इनdय ूबेशन और उ#मशील (सीआईआईई) जैसे सं8थ ाE के साथ काम करेगा। आगामी 5 वषU म (cid:17)110 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] पूरे भारत म (cid:17) कम स े कम 50 8ट ाट2-अप िवकासशील और िनयोजन म(cid:17) सहायता करने के उ()े य से एक कोष क(cid:25) 8थ ापना क(cid:25) जा सकती ह।ै इसका <बंधन 4कसी पेशेवर कंपनी aारा 4कया जाएगा। यह कोष एक उ#म कोष होगा और इसका प3रचालन एक हब और 8प ोक माडल के Nप म(cid:17) 4कया जाएगा और Kय ावसाियक कंपनी कोष k 4Bयाकलाप* का समCव य करेगी तथ कोष को चलान े के िलए समान सं8थ ाE क(cid:25) पहचान भी करेगी। इस कोष स े 8ट ाट2 अप, उ#िमय* और आर एडं डी के िलए इनवेटर* और नई सौर <ौ#ोिग4कय* और साथ ही नवीन और अिaतीय माडल सृिजत करने के िलए िवQत ीयसहायता (इ4(cid:144)टी/ऋण) उपलIध करेगा, िजसका सभी (cid:18)ेR* िजसम (cid:17) उपभोdत ा, एसएमई और वािणिoयक उपयोग के िलए भारत म(cid:17) सौर संबंधी <ौ#ोिगक(cid:25) म(cid:17) वृि(cid:23) और <योग करने क(cid:25) संभावना ह।ै इस पहल से िनजी साव2जिनक भागीदारी माडल आदश2 होगी, िजससे इzछ ुक उ#िमय* के िलए जोिखमपूण2 पूंजी <दान 4कया जा सकेगा। इससे िनजी 8ट ेकहोjड र* से सरकार क(cid:25) धनरािश से कम से कम 10% क(cid:25) रािश <ा=त होगी। कोष म(cid:17) सरकारी सहायता से होनेवाली आय को इस (cid:18)ेR म (cid:17) इनdय ूबेशन को और आग े बढ़ावा 4दय ा जाएगा। यह िमशन सीएसआईआर क(cid:25) ओपेन सोस2 rग िड8क वरी =ल ेटफाम2 क(cid:25) तज2 पर ओप सोस2 सौर िवकास पहल <ारंभ करने के िलए सीएसआईआर के साथ सहयोग करने क(cid:25) सभं ावना का पता भी लगायेगा। 4444....4444....11112222 ििििममममशशशशनननन ककककेेेे ककककााााययययाााा>>(cid:22)(cid:22)>>(cid:22)(cid:22) वव वव ययययनननन हहहहततेेततेे ुु ुुसससस(cid:2)(cid:2)ंं(cid:2)(cid:2)ंं थथ थथ ाााागगगगतततत TTTTयय यय वववव(cid:2)(cid:2)(cid:2)(cid:2)थथ थथ ााााएएएए ंं ंं इस िमशन को एक 8व ायQत शासी सौर ऊजा 2 <ािधकरण aारा नवीन या नवीकरणीय ऊजा2 मंRालय के मौजूदा ढांचे के अंतगत2 अिभगम सौर िमशन aारा काया2िCवत 4कया जाएगा। <ािधकरण/ िमशन सिचवालय <ौ#ोिगक(cid:25) िवकास क(cid:25) िनगरानी, <ोQ साहन क(cid:25) समी(cid:18)ा और समायोजन, िनिधयन अपे(cid:18)ाE का <बंधन और <योिगक प3रयोजनाE के िन!प ादन के िलए उQत रदायी होगा। यह िमशन अपने काय2Bम क(cid:25) ि8थित पर जलवायु प3रवतन2 पर <धानमंRी प3रषद को 3रपोट2 करेगा। 8व ायQत तथा अिभगम िमशन के Kय ापक उ()े य * म(cid:17) िनbन िलिखत शािमल ह*गे : i) रा!" ीय सौर िमशन के कायाC2 व यन क(cid:25) िनगरानी के िलए नवीन और नवीकरणीय ऊजा2 मंRी क(cid:25) अ(cid:2)य (cid:18)ता वाले एक िमशन संचालन दल क(cid:25) 8थ ापना क(cid:25) जाएगी, िजसम (cid:17) सभी संबंिधत मंRालय* और अCय 8ट ेकहोjड र* के <ितिनिध शािमल ह*गे। िमशन संचालन दल को रा!" ीय सौर िमशन के अंतग2त शािमल सभी योजनाE के िलए िविभCन योजनाE/प3रयोजनाE/नीितय* और संबंिधत िवQत ीय मापदडं s अनुमा4दत करने का अिधकार होगा। िमशन के संचालन दल को जारी योजनाE के संबंध म(cid:17) मापदडं * म(cid:17) संशोधन/िवचलन करने का भी अिधकार ह।ै ii) सिचव, नवीन और नवीकरणीय ऊजा2 मंRालय क(cid:25) अ(cid:2)य (cid:18)ता वाली िमशन काय2कारी सिमित िमशन संचालन \ुप aारा अनुमो4दत प3रयोजनाE के काया2Cव यन क(cid:25) समय समय पर पुनरी(cid:18)ा करेगा। iii) िवZय ात वैwािनक क(cid:25) अ(cid:2)य (cid:18)ता म(cid:17) एक अिधकार <ा=त सौर अनुसंधान प3रषद, िमशन को सभी आर एडं डी, <ौ#ोिगक(cid:25) और (cid:18)मता िनमा2ण संबंधी मामल* पर राय दगे ा। इसके अलावा, उ#ोग सलाहकार प3रषद िमशन को औ#ोिगक िवकास, <ौ#ोिगक(cid:25) अंतरण/आमेलन/संयुdत उ#म, <ोQस ाहन और िनवेश संबंधी सभी मामल* पर सलाह दगे ा। iv) अपर सिचव के रOक म(cid:17) िमशन िनदशे क िमशन सिचवालय का अ(cid:2)य (cid:18) होगा और िमशन के 4दन <ित4दन कायU के <ित और समयब(cid:23) तरीके से िनधा23रत ल%य <ा=त करने के िलए उQत रदाई होगा। िमशन सिचवालय म(cid:17) अCय वैwािनक*, िवशेषw* और परामश2दाताE सिहत संयुdत सिचव/वैwािनक ‘जी’ 8त र के अिधकारी ह*गे।¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 111 4444....4444....11113333 ससससौौौौरररर (cid:1)(cid:1)(cid:1)(cid:1)ििििततततUUUUठठ ठठ ाााापपपपनननन ककककेेेे ििििललललएएएए (cid:2)(cid:2)(cid:2)(cid:2)थथ थथ ाााानननन औऔऔऔरररर भभभभििूूििूू मममम एक िवशेष <कार के सौर <ित!ठ ापन क(cid:25) 8थ ापना करने के िलए उपयुdत 8थ ल और पया2=त भूिम का पता लागाना हमारी सबस े पहली <ाथिमकता ह।ै सौर ऊजा2 का उपयोग िनिbन ल िखत तरीके से 4कया जा सकता ह ै : i) सोलर थम2ल का उपयोग घरेलू, वािणिoयक और औ#ोिगक अनु<योग* के िलए <ोससे तापन के Nप म (cid:17) 4कया जा रहा ह ै ii) सौर िव#तु का उपयोग डीडीजी मोड म(cid:17) 4कया जा रहा ह ै iii) सौर िव#तु को िबजली कंपिनय* क(cid:25) ि\ड <णाली म(cid:17) प,चं ाया जा रहा ह।ै िवकjप (i.) और (ii) के मामले म(cid:17) सौर अव8थ ापना के िलए 8थ ल और <योdत ा/<योd ता \ुप के प3रसर* क(cid:25) भूिम या Nफ टाप होगी। तथािप, िवकjप (iii) के मामले म(cid:17), अव8थ ापना का 8थ ल संभवतया ि\ड िस8ट म क(cid:25) प3रिध म(cid:17) होगा। चूं4क ि\ड म (cid:17) प,चं ाई जाने वाली उQप ा4दत िव#ुत क(cid:25) कनेिdटिवटी भी एक मु(ा होगा। य4द 8थ ल िव#ुत 8ट ेशन या उप 8ट ेशन से दरू हो तो ि\ड म(cid:17) िव#तु प,चं ाने के िलए अित3रdत केबल/लाइन(cid:17) िबछानी ह*गी। अत: यह समझा गया ह ै 4क उQप ादन केCf * या ि\ड उप केCf * म(cid:17) सौर अव8थ ापन बहे तर िवकjप ह।ै य4द वह Kय वहाय2 न हो तो इस <योजन के िलए वैकिjपक बंजर भूिम क(cid:25) पहचान क(cid:25) जाए। इस समय दशे म(cid:17) 8थ ािपत (cid:18)मता लगभग 2,10,000 मेगावाट ह।ै 12व(cid:7) योजना के दौरान लगभग 88,000 मेगावाट क(cid:25) (cid:18)मता 8थ ािपत क(cid:25) जा रही ह ै और 13व(cid:7) योजना के दौरान लगभग 1 लाख मेगावाट क(cid:25) (cid:18)मता क(cid:25) संभावना ह।ै इस पूरी (cid:18)मता म(cid:17) भंडारण उपकरण* का उपयोग 4कए िबना वा8त िवक समय म(cid:17) सौर 8थ ापनाE स े उQप ा4दत िबजली को खपाने क(cid:25) बड़ी संभाKय ता ह।ै 4444....4444....11114444 ममममााााननननवववव ससससससंंससंं ााााधधधधनननन ििििववववककककाााासससस सौर ऊजा 2 का Qव 3रत और बड़ े पैमाने पर िव8त ार करने के िलए अंतरा2!" ीय 8त र क(cid:25) तकनीक(cid:25) Nप स े स(cid:18)म जनशिA म(cid:17) सहगामी वृि(cid:23) करने क(cid:25) आव)य कता होगी। दशे म(cid:17) पहले ही कुछ (cid:18)मता मौजूद ह,ै हालां4क सही संZय ा 8थ ािपत 4कए जाने क(cid:25) आव)य कता ह।ै तथािप, यह प3रकjप ना क(cid:25) गई ह ै 4क िमशन मोड़ अविध के अंत म(cid:17) सोलर उ#ोग कुशल (cid:18)ेR म(cid:17) कम से कम 100,000 <िशि(cid:18)त और िवशेषीकृत काPमक* को िनयोिजत करेगा। इनम(cid:17) इंजीिनय[रग मैनेजम(cid:17)ट और आर एंडडी काय2 शािमल ह*गे। मानव संसाधन िवकास के िलए िनbन िलिखत कदम आव)य क ह O : • आईआईटी और <मुख इंजीिनय[रग कॉलेज* को सरकार क(cid:25) िवQत ीय सहायता स े सौर ऊजा2 म(cid:17) िवशेषीकृत पा‘Bम बनाने और िवकिसत करने म(cid:17) शािमल 4कया जाएगा। ये पा‘Bम बीटेक, एमटेक और पीएचडी 8त र के ह*गे। कुछ आईआईटी और इंजीिनय[रग कॉलजे और िव)व िव#ालय 8 नातक और 8न ातकोQत र 8त र पर सौर ऊजा 2 का पा‘Bम पढ़ा रह े ह।O कुछ आईआईटी और इंजीिनय[रग कॉलजे * ने ऊजा 2 अ(cid:2)य यन केCf 8थ ािपत 4कए ह।O इन उपाय* को आगे और सुदढ़ृ 4कया जाएगा। इसके अलावा फ(cid:25)jड अव8थ ापनाE और िबB(cid:25) सेवा नेटवक2 के प)च ात हते ु कुशल जनशिA आव)य कता क(cid:25) पूPत हते ु तकिनिशयन* के िलए दशे Kय ापी <िश(cid:18)ण काय2Bम और िवशेष काय2Bम चलाए जाएगं े। }म मंRालय के अंतग2त िश(cid:18)ा और <िश(cid:18)ण महािनदशे ालय कुशल जनशिA तैयार करने के उ()े य स े तकनीिशयन* के िलए पा‘Bम साम\ी हते ु <िश(cid:18)ण क(cid:25) सेवा और रख रखाव करेगा। नवीन और नवीकरणीय ऊजा2 मंRालय ने }म मंRालय के साथ इस 4Bयाकलाप को पहल े ही शुN कर 4दया ह ै और एक अjप कालीन मॉŠूल वत2मान िश(cid:18)ा सR के दौरान शुN 4कया जाना ह।ै इसके अलावा, उ#ोग कुशल काय 2 दल तैयार करने के िलए कुछ आईआईटी के साथ भी काय2 कर रहा ह।ै112 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] • िवदशे म(cid:17) िव)व 8त रीय सं8थ ाE म(cid:17) सौर ऊजा2 म(cid:17) 100 चयिनत इंजीिनयर*/<ौ#ोिगक(cid:25)िवद* और वैwािनक* को <िश(cid:18)ण दने े का एक सरकारी अ(cid:2)य ेयताविृ ’ काय2Bम आरंभ 4कया जाएगा। 10 वषU के िलए Bिमक Nप से कम हो रह े 8त र* को बनाए रखने क(cid:25) आव)य कता ह।ै इस े जारी िaप(cid:18)ीय काय2Bम* के अंतग2त शािमल 4कया जाएगा। एक सं8थ ान से दसू रे सं8थ ान <बंध भी िवकिसत 4कए जाएगं े। अ(cid:2)य ेयतावृि’ सौर ऊजा2 म(cid:17) दो 8त र* म(cid:17) होगी (i) अनुसंधान और उzच तर िड\ी (एम.टेक), नवीन और नवीकरणीय ऊजा2 मंRालय इस संबंध म(cid:17) पहले ही एक अ(cid:2)य ेयतावृि’ काय2Bम काया2िCवत कर रहा ह,ै िजसम(cid:17) अनेक शैि(cid:18)क सं8थ ान* के छाR* को शािमल 4कया जाएगा। रोजगार के अवसर <दान करने के tk िलए इसे उ#ोग* के परामश 2 से 4कया सकता ह।ै ऊजा2 िवwान और इंजीिनय[रग िवभाग तथा ननै ो इलेिd"क(cid:25) म(cid:17) इसके उQक ृ!ट ता क(cid:17)f से आईआईटी, मुbब ई म(cid:17) रा!" ीय फोटोवोjट ेक अनुसंधान और िश(cid:18)ा केCf क(cid:25) 8थ ापना करने पर िवचार 4कया जा रहा ह।ै 4444....4444....11115555 एएएएममममएएएएननननआआआआररररईईईई GGGGाााारररराााा (cid:2)(cid:2)(cid:2)(cid:2)थथ थथ ााााििििपपपपतततत ककककााााययययबब(cid:22)(cid:22)बब(cid:22)(cid:22) लललल सौर िव#तु संयंR*, को ताप/हाइrो इलेिd"क पावर संयंR* के साथ एक(cid:25)करण करने और सौर Nप टाप <णािलय* को ि\ड के साथ जोड़न े क(cid:25) संभाKय ता से संबंिधत मामल* क(cid:25) जांच करने के िलए नवीन और नवीनीकरण ऊजा 2 मंRालय ने अ(cid:2)य (cid:18), केCf ीय िव#ुत <ािधकरण क(cid:25) अ(cid:2)य (cid:18)ता म (cid:17) एक काय2बल ग3ठत 4कया ह।ै इस काय2बल म(cid:17) नवीन और नीवीनीकरण ऊजा2 मंRालय, िव#ुत मंRालय, एनटीपीसी, एनएचपीसी, बीएचईएल, आरआरईसीएल, आरआरयूवीएनएल, जीएचईसीएल, जीईडीए और केपीसीएल के <ितिनिध शािमल ह।O काय2बल का उ()े य िव#ुत संयंR*, कोयला आधा3रत, गैस आधा3रत और हाइrो िव#तु 8ट ेशन*, <Qय ेक म(cid:17) एक एक सौर संयंR 8थ ािपत करन े के िलए काया2Cव यन यो‚य प3रयोजना 3रपोट2 तैयार करना ह।ै प3रयोजना 3रपोट2 म(cid:17) साम\ी के पूरे िबल, लागत अनुमान, ऊजा2 क(cid:25) गणना, ऊजा 2 क(cid:25) गणना क(cid:25) <णाली और वािणिoयक Kय वहायत2 ा िस(cid:23) करने क(cid:25) Kय वहायत2 ा शािमल होगी। उपदल* का गठन (i) 8थ ान क(cid:25) उपलIध ता के संबंध म(cid:17) सौर उQप ादन क(cid:25) Kय वहाय2ता, भावी बाधाE और अनु<योग (cid:18)ेR* क(cid:25) Kय वहाय2ता (ii) सौर <ौ#ोिगक(cid:25) िवकjप और <ौ#ोिगक(cid:25) आPथक(cid:25) (iii) कनेिdटिवटी और सौ संयंR* क(cid:25) मीट[रग क(cid:25) Kय व8थ ा के िविश!ट (cid:18)ेR* क(cid:25) जाचं करन े के िलए क(cid:25) गई ह।ै उप दल* aारा िनbन िलिखत 3रपोटs तैयार क(cid:25) गई थी और ये 3रपोटs सीईए क(cid:25) वेबसाइट पर उपलIध ह।O • iQ ि\ड इंटेरेिdटव N टाप सोलर पीवी िस8ट म पर • उप दल-। क(cid:25) 3रपोट2 – 4दसंबर, 2009 • सेवा भवन के िलए ि\ड इंटेरेिdटव Nफटाप सोलर पीवी िस8ट म क(cid:25) उपदल िविनदशh न – 4दसंबर, 2009 • थम2ल/जल िव#ुत 8ट ेशन* के साथ सौर <णािलय* क(cid:25) उप दल-।। और ।।। एक(cid:25)करण क(cid:25) 3रपोट2 – जनवरी, 2010 उप दल-। aारा लेह म(cid:17) 5 मेगावाट सौर संयंR 8थ ािपत करने के िलए एक Kय वहाय2ता 3रपोट2 भी तैयार क(cid:25) गई और इस 3रपोट2 को सिचव, नीवन और नवीकरणीय ऊजा2 मंRालय को भेजी गई। 4444....4444....11116666ििििननननििििधधधधयययय'''' कककक1111 आआआआववववYYYYयय यय ककककतततताााा सौर अव8थ ापन* के िवकास म(cid:17) एक मुZय बाधा उzच पूंजी लागत ह ै िजससे पारंप3रक ऊजा2 qोत* का उपयोग करके पैदा क(cid:25) गई िबजली क(cid:25) तुलना म(cid:17) अिधक टै3रफ आता ह।ै अनुमान ह ै 4क सौर अव8 थापनाE क(cid:25) पूंजी लागत vFkkZr~~ लगभग 20 करोड़ T./मेगावाट ह।ै सोलर थम2ल सीिमत Nप से कम लगभग 18 करोड़ T./मेगावाट ह।ै तथािप, अनुमान ह ै 4क लागत म(cid:17) कमी आएगी dय *4क <ौ#ोिगक(cid:25) 8थ ािपत हो जाती ह ै और समय के साथ साथ¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 113 yxHkx ऑडर2 क(cid:25) माRा म(cid:17) बढ़ोQत री हो जाती ह।ै आशा ह ै 4क 11व(cid:7) योजना के दौरान जो लागत 20 करोड़ Tपए/मेगावाट ह,ै वह 12व(cid:7) योजना के दौरान कम होकर 16 करोड़ Nपए/मेगावाट और 13व(cid:7) योजना के दौरान 12 करोड़ Nपए/मेगावाट हो जाएगी। पपपपहहहहललललाााा चचचचररररणणणण ददददससससूूूू रररराााा चचचचररररणणणण ततततीीीीससससरररराााा चचचचररररणणणण ((((2222000000008888----11113333)))) ((((2222000011113333----11117777)))) ((((2222000011117777----22222222)))) (cid:2)(cid:2)(cid:2)(cid:2)थथ थथ ााााििििपपपपतततत (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा ((((ससससौौौौरररर)))) ममममगगेेगगेे ााााववववााााटटटट मममम $$ $$ 1000 10000 22220000,,,,000000000000 ममममेगेगेगेगााााववववााााटटटट ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा 1000 9000 11110000,,,,000000000000 अअअअििििभभभभववववििृृििृृ (cid:31)(cid:31)(cid:31)(cid:31) ममममेगेगेगेगााााववववााााटटटट ककककेेेे अअअअननननससुुससुु ाााारररर ििििननननििििधधधध कककक1111 आआआआववववYYYYयय यय ककककतततताााा 20 16 11112222 ((((ककककररररोोोोड़ड़ड़ड़ ____....)))) ििििननननििििधधधध आआआआववववYYYYयय यय ककककतततताााा ((((ककककररररोोोोड़ड़ड़ड़ ____....)))) 22220000,,,,000000000000 1111,,,,44444444,,,,000000000000 1111,,,,22220000,,,,000000000000 जेएनएनएसएम के अनुसार िमशन के िलए िनिधय* क(cid:25) आव)य कता को िनbन िलिखत qोत* से पूरी क(cid:25) जाएगी : i) नवीन और नवीकरणीय ऊजा2 मंRालय के अंतग2त 8थ ािपत रा!" ीय और सौर िमशन के अतं ग2त 4Bयाकलाप* के िलए बजटीय सहायता; ii) यूएनएफसीसीसी Œेमवक2 के अंतग2त अंतरा2!" ीय िनिधयां िजससे िमशन के ल%य * को बढ़ाया जा सकेगा। िमशन नीित म(cid:17) सौर ऊजा 2 के <योग म(cid:17) वृि(cid:23) करने और दशे म(cid:17) िवQत ीय बाधाE और खच2 वहन करने क(cid:25) चनु ौती को (cid:2)य ान म(cid:17) रखकर करन े के दोहरे उ()े य को (cid:2)य ान म(cid:17) रखा गया ह ै जहां अिधकांश लोग* तक बुिनयादी िबजली I तक प,चं नह(cid:7) ह ै और वे िनध2न ह O और उzच लागत वहन नह(cid:7) कर सकते। चरण- के िलए िनिधय* क(cid:25) आव)य कता और <बंध का िनधा2रण 11व(cid:7) योजना के अतं म(cid:17) <ा=त <गित क(cid:25) समी(cid:18)ा करन े और िबजली कंपनी 8क ेल सौर िव#ुत क(cid:25) (cid:18)मता िनमा2ण के िलए अपनाए गए माडल क(cid:25) (cid:18)मता के िव)ल ेषण के प)च ात 4कया जाएगा। ------------++++++++++++------------114 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] अअअअननननबबुुबबुु धधंंधधंं ----4444....1111 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन जजजजीीीीववववनननन ििििवववव(cid:2)(cid:2)(cid:2)(cid:2)तत तत ाााारररर ककककाााायययय (cid:22)(cid:22) (cid:22)(cid:22)ककककेेेे ििििललललएएएए ययययििूूििूू ननननटटटट ककककाााायययय``(cid:22)(cid:22)``(cid:22)(cid:22) मममम 1111.... रररराााा8888यय यय (cid:26)(cid:26)(cid:26)(cid:26)KKेेKKेे (cid:20).सं रा(cid:21)य सेवा का नाम (cid:22)ट ेशन का नाम इकाई (cid:22)थ ापना (cid:27)मता Make एलएमजेड / सं. वष(cid:15) (मेगावाट) (cid:28)व ॉयलर टीजी केड(cid:28)(cid:29) य ूयू उउउउ(cid:30)(cid:30)(cid:30)(cid:30)तततत ररररीीीी (cid:6)(cid:6)(cid:6)(cid:6)(cid:8)(cid:8)(cid:8)(cid:8)ेेेे 1 उ! तर (cid:5)देश यूपीआरवीयूएनएल ओबरा 10 1977 200 भेल भेल एलएमजेड 2 उ! तर (cid:5)देश यूपीआरवीयूएनएल ओबरा 11 1977 200 भेल भेल एलएमजेड 3 उ! तर (cid:5)देश यूपीआरवीयूएनएल ओबरा 12 1981 200 भेल भेल एलएमजेड 4 उ! तर (cid:5)देश यूपीआरवीयूएनएल ओबरा 13 1982 200 भेल भेल एलएमजेड 5 उ! तर (cid:5)देश यूपीआरवीयूएनएल हरदगू ंज 7 1978 110 भेल भेल 6 उ! तर (cid:5)देश यूपीआरवीयूएनएल प$रछा 1 1984 110 भेल भेल 7 उ! तर (cid:5)देश यूपीआरवीयूएनएल प$रछा 2 1985 110 भेल भेल उप जोड़ 7 1130 8 पंजाब पीएसपीसीएल भ'टडा 3 1978 110 भेल भेल 9 पंजाब पीएसपीसीएल भ'टडा 4 1979 110 भेल भेल उप जोड़ 2 220 10 ह$रयाणा एचपीजीसीएल पानीपत 3 1985 110 भेल भेल 11 ह$रयाणा एचपीजीसीएल पानीपत 4 1985 110 भेल भेल उप जोड़ 2 220 उउउउपपपप जजजजोोोोड़ड़ड़ड़ उउउउ(cid:30)(cid:30)(cid:30)(cid:30)तततत ररररीीीी (cid:6)(cid:6)(cid:6)(cid:6)(cid:8)(cid:8)(cid:8)(cid:8)ेेेे 11111111 1111555577770000 पपपपिििि(cid:3)(cid:3)(cid:3)(cid:3)ममममीीीी (cid:6)(cid:6)(cid:6)(cid:6)(cid:8)(cid:8)(cid:8)(cid:8)ेेेे 12 महारा*+ महाजेनको नािशक 3 1979 210 भेल भेल एलएमजेड 13 महारा*+ महाजेनको नािशक 4 1980 210 भेल भेल एलएमजेड 14 महारा*+ महाजेनको कोराडी 5 1978 210 भले भेल एलएमजेड 15 महारा*+ महाजेनको कोराडी 6 1982 200 भेल भेल एलएमजेड 16 महारा*+ महाजेनको भुसावल 2 1979 210 भेल भेल एलएमजेड 17 महारा*+ महाजेनको भुसावल 3 1982 210 भेल भेल एलएमजेड 18 महारा*+ महाजेनको चं-पुर 1 1983 210 भेल भेल एलएमजेड 19 महारा*+ महाजेनको चं-पुर 2 1984 210 भेल भेल एलएमजेड 20 महारा*+ महाजेनको पल/ 3 1980 210 भेल भेल एलएमजेड उप जोड़ 9 1880¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 115 (cid:20).सं रा(cid:21)य सेवा का नाम (cid:22)ट ेशन का नाम इकाई (cid:22)थ ापना (cid:27)मता Make एलएमजेड / सं. वष(cid:15) (मेगावाट) (cid:28)व ॉयलर टीजी केड(cid:28)(cid:29) य ूयू 21 छ!त ीसगढ़ सीएसईबी कोरबा (पि2म बंगाल) 1 1983 210 भेल भेल केड(cid:28)(cid:29) य ू 22 छ!त ीसगढ़ सीएसईबी कोरबा (पि2म बंगाल) 2 1984 210 भेल भेल केड(cid:28)(cid:29) य ू उप जोड़ 2 420 23 म5य (cid:5)दशे एमपीपीजीसीएल सतपुड़ा 6 1979 200 भेल भेल एलएमजेड 24 म5य (cid:5)दशे एमपीपीजीसीएल सतपुड़ा 7 1979 210 भेल भेल एलएमजेड उप जोड़ 2 410 उउउउपपपप जजजजोोोोड़ड़ड़ड़ पपपपिििि(cid:3)(cid:3)(cid:3)(cid:3)ममममीीीी (cid:6)(cid:6)(cid:6)(cid:6)(cid:8)(cid:8)(cid:8)(cid:8)ेेेे 11117777 3333555533330000 ददददिििि(cid:6)(cid:6)(cid:6)(cid:6)णणणणीीीी (cid:6)(cid:6)(cid:6)(cid:6)(cid:8)(cid:8)(cid:8)(cid:8)ेेेे 25 तिमलनाडु टीएनईबी तूतीकोरीन 1 1979 210 भेल भेल एलएमजेड 26 तिमलनाडु टीएनईबी तूतीकोरीन 2 1980 210 भेल भेल एलएमजेड उप जोड़ 2 420 27 आं(cid:3) (cid:5)देश एपीगेनको डा. एन.टी. टीपीएस 1 1979 210 भेल भेल एलएमजेड (िवजयवाड़ा) 28 आं(cid:3) (cid:5)देश एपीगेनको डा. एन.टी. टीपीएस 2 1980 210 भेल भेल एलएमजेड (िवजयवाड़ा) उप जोड़ 2 420 29 कना(cid:15)टक केपीसीएल रायचूर 1 1985 210 भेल भेल केड(cid:28)(cid:29) य ूयू 30 कना(cid:15)टक केपीसीएल रायचूर 2 1986 210 भेल भेल केड(cid:28)(cid:29) य ूयू उप जोड़ 2 420 उउउउपपपप जजजजोोोोड़ड़ड़ड़ ददददिििि(cid:6)(cid:6)(cid:6)(cid:6)णणणणीीीी (cid:6)(cid:6)(cid:6)(cid:6)(cid:8)(cid:8)(cid:8)(cid:8)ेेेे 6666 1111222266660000 31 िबहार बीएसईबी बरौनी 6 1983 110 भेल भेल 32 िबहार बीएसईबी बरौनी 7 1985 110 भेल भेल 33 िबहार केबीयूएनएल मुज8फरपुर 1 1985 110 भेल भेल 34 िबहार केबीयूएनएल मुज8फरपुर 2 1986 110 भेल भेल उउउउपपपप जजजजोोोोड़ड़ड़ड़ 4 440 35 पि2मी बंगाल ड(cid:28)(cid:29) य ूबीपीडीसीएल कोलघाट 1 1990 210 एवीबी भेल एलएमजेड 36 पि2मी बंगाल ड(cid:28)(cid:29) य ूबीपीडीसीएल कोलघाट 2 1985 210 एवीबी भेल एलएमजेड 37 पि2मी बंगाल ड(cid:28)(cid:29) य ूबीपीडीसीएल कोलघाट 3 1984 210 एवीबी भेल एलएमजेड 38 पि2मी बंगाल ड(cid:28)(cid:29) य ूबीपीडीसीएल बंडले 5 1982 210 एवीबी भेल एलएमजेड उप जोड़ 4 840 उउउउपपपप जजजजोोोोड़ड़ड़ड़ पपपपववूूववूू &&&& (cid:6)(cid:6)(cid:6)(cid:6)(cid:8)(cid:8)(cid:8)(cid:8)ेेेे 8888 1111222288880000116 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] (cid:20).सं रा(cid:21)य सेवा का नाम (cid:22)ट ेशन का नाम इकाई (cid:22)थ ापना (cid:27)मता Make एलएमजेड / सं. वष(cid:15) (मेगावाट) (cid:28)व ॉयलर टीजी केड(cid:28)(cid:29) य ूयू उउउउपपपप जजजजोोोोड़ड़ड़ड़ रररराााा(cid:12)(cid:12)(cid:12)(cid:12)यययय (cid:6)(cid:6)(cid:6)(cid:6)(cid:8)(cid:8)(cid:8)(cid:8)ेेेे 33338888 6666888822220000 2222.... ककककेेेे(cid:16)(cid:16)(cid:16)(cid:16)(cid:17)(cid:17) (cid:17)(cid:17) ीीीीयययय (cid:6)(cid:6)(cid:6)(cid:6)(cid:8)(cid:8)(cid:8)(cid:8)ेेेे (cid:20). सं. सेवा का नाम (cid:22)ट ेशन का नाम इकाई (cid:22)थ ापना (cid:27)मता eeeessssdddd एलएमजेड / सं. वष(cid:15) (मेगावाट) (cid:28)व ॉयलर टीजी केड(cid:28)(cid:29) य ूयू 1 डीवीसी बोकारो 'बी' 1 1986 210 एबीएल भेल एलएमजेड 2 डीवीसी बोकारो 'बी' 2 1990 210 एबीएल भेल एलएमजेड 3 डीवीसी बोकारो 'बी' 3 1993 210 एबीएल भेल एलएमजेड 4 डीवीसी दगु ा(cid:15)पुर 4 1982 210 भेल भेल एलएमजेड उउउउपपपप जजजजोोोोड़ड़ड़ड़ 4444 888844440000 5 एनटीपीसी बदरपुर 4 1978 210 भेल भेल एलएमजेड 6 एनटीपीसी बदरपुर 5 1981 210 भेल भेल एलएमजेड 7 एनटीपीसी :सगरौली एसटीपीएस 1 1982 200 भेल भेल एलएमजेड 8 एनटीपीसी :सगरौली एसटीपीएस 2 1982 200 भेल भेल एलएमजेड 9 एनटीपीसी :सगरौली एसटीपीएस 3 1983 200 भेल भेल एलएमजेड 10 एनटीपीसी :सगरौली एसटीपीएस 4 1983 200 भेल भेल एलएमजेड 11 एनटीपीसी :सगरौली एसटीपीएस 5 1984 200 भेल भेल एलएमजेड 12 एनटीपीसी कोरबा एसटीपीएस 1 1983 200 भेल भेल केड(cid:28)(cid:29) य ूयू 13 एनटीपीसी कोरबा एसटीपीएस 2 1983 200 भेल भेल केड(cid:28)(cid:29) य ूयू 14 एनटीपीसी कोरबा एसटीपीएस 3 1984 200 भेल भेल केड(cid:28)(cid:29) य ूयू 15 एनटीपीसी रामागुंडम एसटीपीएस 1 1984 200 अंसा(cid:29) डो अंसा(cid:29) डो केड(cid:28)(cid:29) य ूयू 16 एनटीपीसी रामागुंडम एसटीपीएस 2 1984 200 अंसा(cid:29) डो अंसा(cid:29) डो केड(cid:28)(cid:29) य ूयू 17 एनटीपीसी रामागुंडम एसटीपीएस 3 1984 200 अंसा(cid:29) डो अंसा(cid:29) डो केड(cid:28)(cid:29) य ूयू उप जोड़ एनटीपीसी 13 2620¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 117 एएएएललललईईईई गगगगससैैससैै आआआआधधधधाााा////ररररतततत ककककेेेे>>>>WW WW ीीीीयययय (cid:26)(cid:26)(cid:26)(cid:26)KKेेKKेे (cid:20).सं. सं(cid:22)थ ा का नाम (cid:22)ट ेशन का नाम इकाई (cid:22)थ ापना (cid:27)मता मेक सं?या वष(cid:15) (मेगावाट) 1 एनटीपीसी दादरी जीटी जीटी-1 1992 131 एसआईईएमईएनएस 2 एनटीपीसी दादरी जीटी जीटी-2 1992 131 एसआईईएमईएनएस 3 एनटीपीसी दादरी जीटी जीटी-3 1992 131 एसआईईएमईएनएस 4 एनटीपीसी दादरी जीटी जीटी-4 1992 131 एसआईईएमईएनएस 5 एनटीपीसी औरइया जीटी जीटी-1 1989 111.19 एमएचआई, जापान 6 एनटीपीसी औरइया जीटी जीटी-2 1989 111.19 एमएचआई, जापान 7 एनटीपीसी औरइया जीटी जीटी-3 1989 111.19 एमएचआई, जापान 8 एनटीपीसी औरइया जीटी जीटी-4 1989 111.19 एमएचआई, जापान 9 एनटीपीसी कवास जीटी जीटी-1 1992 106 जीई 10 एनटीपीसी कवास जीटी जीटी-2 1992 106 जीई 11 एनटीपीसी कवास जीटी जीटी-3 1992 106 जीई 12 एनटीपीसी कवास जीटी जीटी-4 1992 106 जीई 13 एनटीपीसी गंधार जीटी जीटी-1 1994 131 एबीबी 14 एनटीपीसी गंधार जीटी जीटी-2 1994 131 एबीबी 15 एनटीपीसी गंधार जीटी जीटी-3 1994 131 एबीबी उप जोड़ (गैस आधा$रत) 1785.8 उउउउपपपप जजजजोोोोड़ड़ड़ड़ एएएएननननटटटटीीीीपपपपीीीीससससीीीी 22228888 4444444400006666 उउउउपपपप जजजजोोोोड़ड़ड़ड़ ककककेेेे>>>>WW WW ीीीीयययय (cid:26)(cid:26)(cid:26)(cid:26)KKेेKKेे 33332222 5555222244446666 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककाााा जजजजोोोोड़ड़ड़ड़ ((((एएएएललललईईईई)))) :::: ययययििूूििूू ननननटटटट कककक1111 ससससPPंंPPंं यय यय ाााा :::: 77770000 (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा ((((ममममगगेेगगेे ााााववववााााटटटट)))) :::: 11112222000066666666118 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] अअअअननननबबुुबबुु धधंंधधंं ----4444....2222 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे अअअअततंंततंं गगगगतत(cid:22)(cid:22)तत(cid:22)(cid:22) आआआआरररर एएएएccccडड डड एएएएमममम ककककााााययययkkkk ककककेेेे ििििललललएएएए थथथथममममलल(cid:22)(cid:22)लल(cid:22)(cid:22) ययययििूूििूू ननननटटटट ककककाााायययय``(cid:22)(cid:22)``(cid:22)(cid:22) मममम 3333.... रररराााा8888यय यय (cid:26)(cid:26)(cid:26)(cid:26)KKेेKKेे (cid:9)(cid:9)(cid:9)(cid:9)....सससस...ंं.ंं रररराााा(cid:12)(cid:12)(cid:12)(cid:12)यय यय ससससववववेेेे ाााा ककककाााा ननननाााामममम ''''टट टट ेेशशेेशशनननन ककककाााा ययययििूूििूूननननटटटट ''''थथ थथ ाााापपपपनननन (cid:6)(cid:6)(cid:6)(cid:6)ममममतततताााा MMMMaaaakkkkeeee ननननाााामममम सससस(cid:23)(cid:23)ंं(cid:23)(cid:23)ंं यययय ाााा ववववषषषष ++ ++ ((((ममममगगगगेेेे ााााववववााााटटटट)))) ,,,,वव वव ॉॉॉॉययययललललरररर टटटटीीीीजजजजीीीी उउउउ(cid:30)(cid:30)(cid:30)(cid:30)तततत ररररीीीी (cid:6)(cid:6)(cid:6)(cid:6)(cid:8)(cid:8)(cid:8)(cid:8)ेेेे 1 उ! तर (cid:5)देश यूपीआरवीयूएनएल अनपरा 1 1986 210 भेल भेल 2 उ! तर (cid:5)देश यूपीआरवीयूएनएल अनपरा 2 1986 210 भेल भेल 3 उ! तर (cid:5)देश यूपीआरवीयूएनएल अनपरा 3 1988 210 भेल भेल 4 उ! तर (cid:5)देश यूपीआरवीयूएनएल अनपरा ‘B’ 4 1993 500 एमएचआई तोशीबा 5 उ! तर (cid:5)देश यूपीआरवीयूएनएल अनपरा ‘B’ 5 1994 500 एमएचआई तोशीबा 6 उ! तर (cid:5)देश यूपीआरवीयूएनएल ओबरा 7 1974 100 भेल भेल उउउउपपपप जजजजोोोोड़ड़ड़ड़ 6666 1111777733330000 7 पंजाब पीएसईबी रोपड़ 1 1984 210 भेल भेल 8 पंजाब पीएसईबी रोपड़ 2 1985 210 भेल भेल 9 पंजाब पीएसईबी रोपड़ 5 1992 210 भेल भेल 10 पंजाब पीएसईबी रोपड़ 6 1993 210 भेल भेल उउउउपपपप जजजजोोोोड़ड़ड़ड़ 4 840 11 ह$रयाणा एचपीजीसीएल पानीपत 5 1993 210 भेल भेल ककककुुुुलललल उउउउ(cid:30)(cid:30)(cid:30)(cid:30)तततत ररररीीीी (cid:6)(cid:6)(cid:6)(cid:6)(cid:8)(cid:8)(cid:8)ेे(cid:8)ेे 11111111 2222777788880000 पपपपिििि(cid:3)(cid:3)(cid:3)(cid:3)ममममीीीी (cid:6)(cid:6)(cid:6)(cid:6)(cid:8)(cid:8)(cid:8)(cid:8)ेेेे 12 गुजरात जीएसईसीएल वनकबोरी 1 1982 210 भेल भेल 13 गुजरात जीएसईसीएल वनकबोरी 2 1983 210 भेल भेल 14 गुजरात जीएसईसीएल उकाई 3 1979 200 भेल भेल 15 गुजरात जीएसईसीएल उकाई 4 1979 200 भेल भेल उउउउपपपप जजजजोोोोड़ड़ड़ड़ 4444 888822220000 16 राज(cid:22)थ ान आरआरवीयूएनएल कोटा 1 1983 110 भेल भेल-(cid:22)क ोदा 17 राज(cid:22)थ ान आरआरवीयूएनएल कोटा 2 1983 110 भेल भेल- (cid:22)क ोदा उप जोड़ 2 220 ककककुुुुलललल पपपपिििि(cid:3)(cid:3)(cid:3)(cid:3)ममममीीीी (cid:6)(cid:6)(cid:6)(cid:6)(cid:8)(cid:8)(cid:8)(cid:8)ेेेे 6666 1111000044440000 पपपपववूूववूू &&&& (cid:6)(cid:6)(cid:6)(cid:6)(cid:8)(cid:8)(cid:8)(cid:8)ेेेे 18 झारखंड जेएसईबी पतरातू 9 1984 110 भेल भेल¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 119 19 झारखंड जेएसईबी पतरातू 10 1986 110 भेल भेल उपजोड़ 2 220 20 पि2मी डीपीएल दगु ा(cid:15)पुर 6 1985 110 एवीबी भेल बंगाल ककककुुुुलललल पपपपववववूूूू &&&& (cid:6)(cid:6)(cid:6)(cid:6)(cid:8)(cid:8)(cid:8)(cid:8)ेेेे 3333 333333330000 ककककुुुुलललल रररराााा(cid:12)(cid:12)(cid:12)(cid:12)यययय (cid:6)(cid:6)(cid:6)(cid:6)(cid:8)(cid:8)(cid:8)(cid:8)ेेेे 22220000 4444111155550000 2222. केCf ीय (cid:18)ेR –––– कोयला आधा3रत यूिनट ####....सससस..ंं..ंं सससस$$ंं$$ंं थथ थथ ाााा पपपपााााववववरररर $$$$टट टट ेेशशेेशशनननन ककककाााा ननननाााामममम यूिनट (cid:1)थ ापना वष (cid:9) (cid:10)मता (cid:13)व ॉयलर का टीजी का मेक सं. (मेगावाट) मेक 1 एनटीपीसी (cid:15)सगरौली एसटीपीएस 6 1986 500 भेल भेल 2 एनटीपीसी (cid:15)सगरौली एसटीपीएस 7 1987 500 भेल भेल 3 एनटीपीसी एसटीपीएस 4 1987 500 भेल भेल 4 एनटीपीसी एसटीपीएस 5 1988 500 भेल भेल 5 एनटीपीसी एसटीपीएस 6 1988 500 भेल भेल 6 एनटीपीसी रामागुंडम एसटीपीएस 4 1988 500 यूएसएसआर यूएसएसआर 7 एनटीपीसी रामागडुं म एसटीपीएस 5 1989 500 भेल भेल 8 एनटीपीसी रामागुंडम एसटीपीएस 6 1989 500 भेल भेल 9 एनटीपीसी फर(cid:25) का चरण-II 4 1992 500 अंसा(cid:29)ड ो भेल 10 एनटीपीसी फर(cid:25) का चरण-II 5 1994 500 अंसा(cid:29)ड ो भेल 11 एनटीपीसी टांडा 2 1989 110 भेल भेल 12 एनटीपीसी ऊंचाहार 1 1988 210 भेल भेल 13 एनटीपीसी ऊंचाहार 2 1989 210 भेल भेल 14 एनटीपीसी ऊंचाहार 3 1999 210 भेल भेल 15 एनटीपीसी ऊंचाहार 4 1999 210 भेल भेल 16 एनटीपीसी (cid:15)व याचल 1 1987 210 यूएसएसआर यूएसएसआर 17 एनटीपीसी (cid:15)व याचल 2 1988 210 यूएसएसआर यूएसएसआर 18 एनटीपीसी (cid:15)व याचल 3 1989 210 यूएसएसआर यूएसएसआर (cid:15)व याचल 19 एनटीपीसी (cid:15)व याचल 4 1989 210 यूएसएसआर यूएसएसआर 20 एनटीपीसी (cid:15)व याचल 5 1990 210 यूएसएसआर यूएसएसआर 21 एनटीपीसी (cid:15)व याचल 6 1991 210 यूएसएसआर यूएसएसआर 22 एनटीपीसी (cid:15)व याचल 7 1999 500 भेल भेल 23 एनटीपीसी (cid:15)व याचल 8 2000 500 भेल भेल120 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ####....सससस..ंं..ंं सससस$$ंं$$ंं थथ थथ ाााा पपपपााााववववरररर $$$$टट टट ेेशशेेशशनननन ककककाााा ननननाााामममम यूिनट (cid:1)थ ापना वष (cid:9) (cid:10)मता (cid:13)व ॉयलर का टीजी का मेक सं. (मेगावाट) मेक 24 एनटीपीसी िस# हा%ी 1 2002 500 भेल भेल 25 एनटीपीसी िस# हा%ी 2 2002 500 भेल भेल 26 एनटीपीसी तलचर एसटीपीएस 1 1995 500 भेल भेल 27 एनटीपीसी तलचर एसटीपीएस 2 1996 500 भेल भेल 28 एनटीपीसी दादरी 1 1991 210 भेल भेल 29 एनटीपीसी दादरी 2 1992 210 भेल भेल 30 एनटीपीसी दादरी 3 1993 210 भेल भेल 31 एनटीपीसी दादरी 4 1994 210 भेल भेल 32 एनटीपीसी &रहदं एसटीपीएस फेज- III 1 1988 500 भेल भेल 33 एनटीपीसी &रहदं एसटीपीएस फेज- III 2 1989 500 भेल भेल 34 एनटीपीसी कहलगांव 1 1992 210 भेल भेल 35 एनटीपीसी कहलगांव 2 1994 210 भेल भेल 36 एनटीपीसी कहलगांव 3 1995 210 भेल भेल 37 एनटीपीसी कहलगांव 4 1996 210 भेल भेल उउउउपपपप जजजजोोोोड़ड़ड़ड़ 33337777 11112222888899990000 गगगगससैैससैै आआआआधधधधाााा////ररररतततत ययययििूूििूू ननननटटटट ####....सससस..ंं..ंं ससससेवेवेवेवाााा ककककाााा ननननाााामममम $$$$टट टट ेेशशेेशशनननन ककककाााा ननननाााामममम ययययििूूििूू ननननटटटट ककककाााा $$$$थथ थथ ाााापपपपननननाााा (cid:28)(cid:28)(cid:28)(cid:28)ममममतततताााा ममममककेेककेे ननननाााामममम ववववषषषष (( (( ((((ममममगगेेगगेे ााााववववााााटटटट)))) 1 नीपको कथलगुरी सीसीजीटी जीटी-1 1995 33.50 िम*स िु बशी, जापान 2 नीपको कथलगुरी सीसीजीटी जीटी-2 1995 33.50 िम*स िु बशी, जापान 3 नीपको कथलगुरी सीसीजीटी जीटी-3 1995 33.50 िम*स िु बशी, जापान 4 नीपको कथलगुरी सीसीजीटी जीटी-4 1995 33.50 िम*स िु बशी, जापान 5 नीपको कथलगुरी सीसीजीटी जीटी-5 1996 33.50 िम*स िु बशी, जापान 6 नीपको कथलगुरी सीसीजीटी जीटी-6 1996 33.50 िम*स िु बशी, जापान 7 नीपको कथलगुरी सीसीजीटी एसटी-1 1998 30.00 भेल 8 नीपको कथलगुरी सीसीजीटी एसटी-2 1998 30.00 भेल उउउउपपपप जजजजोोोोड़ड़ड़ड़ 8888 222266661111....00000000 ककककुुुुलललल ककककेेेे))))** ** ीीीीयययय (cid:28)(cid:28)(cid:28)(cid:28),,ेे,,ेे 44445555 11113333111155551111¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 121 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककाााा जजजजोोोोड़ड़ड़ड़ ((((आआआआरररर एएएएccccडड डड एएएएमममम)))) :::: ययययििूूििूू ननननटटटट'''' कककक1111 ससससPPंंPPंं यय यय ाााा :::: 66665555 (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा ((((ममममगगेेगगेे ााााववववााााटटटट)))) :::: 11117777333300001111 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककाााा जजजजोोोोड़ड़ड़ड़ ((((एएएएललललईईईई++++आआआआररररएएएएccccडड डड एएएएमममम)))) 111133335555 (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा ((((ममममगगेेगगेे ााााववववााााटटटट)))) 22229999333366667777 संि(cid:18)िxया::ं:: आर एvड एम– नवीनीकरण एवं आधुिनक(cid:25)करण;. यू – अपरे[टग; एलई – जीवन िव8त ार ; आरईएस – रे8ट ोरेशन; मेगावाट – मेगावाट; सीएस-केCf ीय (cid:18)ेR: एसएस- राoय (cid:18)ेR $ - Bम संZय ा 2 पर दहे र के िलए 8थ ािपत (cid:18)मता (Ph.b) और Bम सं. 21 पर नागझरी (यूिनट 4-6) को कुल योग म(cid:17) शािमल नह(cid:7) 4कया गया ह ै dय *4क इनक(cid:25) गणना Bमश: B.सं. 1 और 6 के िलए पहले ही कर दी गई ह।ै संि(cid:18)िxया:ं आर एvड एम– नवीनीकरण और आधुिनक(cid:25)करण;. यू – अपरे[टग; एलई – जीवन िव8त ार ; आरईएस – रे8ट ोरेशन; मेगावाट – मेगावाट; सीएस-केCf ीय (cid:18)ेR: एसएस- राoय $ - Bम संZय ा 10 पर दहे र के िलए 8थ ािपत (cid:18)मता (Ph.A) और Bम सं. 22 पर नागझरी (यूिनट 4-6), Bम सZं य ा 4 पर िचjल ा और Bम संZय ा 56 पर खोदरी (Ph.B) को कुल योग म(cid:17) शािमल नह(cid:7) 4कया गया ह ै dय *4क इनक(cid:25) गणना Bमश: B.स.ं 1, 21, 37 और 3 म(cid:17) पहले ही कर दी गई ह।ै ससससििंंििंं (cid:26)(cid:26)(cid:26)(cid:26)ििििllllययययाााा ंंंं: आर एvड एम– नवीनीकरण और आधुिनक(cid:25)करण; आर एम एvड यू– नवीनीकरण , आधुिनक(cid:25)करण और अपरे[टग, आरएम एvड एलई – नवीनीकरण , आधुिनक(cid:25)करण और जीवन िव8त ार आरएमयू एvड एलई– नवीनीकरण , आधुिनक(cid:25)करण, अपरे[टग और जीवन िव8त ार ; आरएvड एम + आरईएस -नवीनीकरण और आधुिनक(cid:25)करण + रे8ट ोरेशन; आरएम एvड एलई+आरईएस.- नवीनीकरण , आधुिनक(cid:25)करण और जीवन िव8त ार + रे8ट ोरेशन; आरएम एvड यू+आरईएस. – नवीनीकरण , आधुिनक(cid:25)करण और अपरे[टग + रे8ट ोरेशन. – ; – ; – ; – मेगावाट मेगावाट आरईएस रे8ट ोरेशन यू अपरे[टग एलई जीवन िव8त ार122 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] अअअअननननबबुुबबुु धधंंधधंं 4444....3333 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन 33331111....3333....2222000011112222 ततततकककक कककक1111 उउउउपपपपललललिििि;;;;धधधधयययय'''' ककककेेेे ििििललललएएएए हहहहााााइइइइ<<<<ोोोो आआआआरररर एएएएccccडड डड एएएएमममम,,,, जजजजीीीीववववनननन ििििवववव(cid:2)(cid:2)(cid:2)(cid:2)तत तत ाााारररर औऔऔऔरररर अअअअपपपपररररेेेेbbbbटटटटगगगग ययययोोोोजजजजननननाााा???? ककककेेेे ििििललललएएएए रररराााा8888यय यय ववववाााारररर ककककाााायययय``(cid:22)(cid:22)``(cid:22)(cid:22) मममम (cid:9)(cid:9)(cid:9)(cid:9).... पपपप0000ररररययययोोोोजजजजननननाााा ससससीीीीएएएएसससस////एएएएससससएएएएसससस ''''थथ थथ ााााििििपपपपतततत ((((ककककररररोोोोड़ड़ड़ड़ 3333.... मममम))))2222 ललललााााभभभभ 4444णणणणेेेे ीीीी अअअअननननपपपपुुुु ााााललललनननन सससस....ंंंं एएएएजजजजसससस2222 ीीीी (cid:6)(cid:6)(cid:6)(cid:6)ममममतततताााा अअअअननननममममुुुु ााााििििननननतततत ववववाााा''''तततत ििििववववकककक ((((ममममगगगगेेेे ााााववववााााटटटट )))) ककककाााा ववववषषषष ++ ++ ((((ममममगगगगेेेे ााााववववााााटटटट)))) ललललाााागगगगतततत Bय य ((((5555ााााववववधधधधाााानननन)))) जजजजााााररररीीीी ययययोोोोजजजजननननाााा –––– ककककााााययययाााा(cid:16)(cid:16)++(cid:16)(cid:16)++वववव ययययनननन ककककेेेे अअअअततततंंंं गगगगतततत++++ ििििहहहहममममााााचचचचलललल 5555ददददशशशशेेेे 1 भाखड़ा एलबी, सीएस 5x108 489.77 222.15 540.00 आरएमयू और 2014-15 एलई बीबीएमबी (31.3.2012 (एलई) + कC ि(cid:22)थित के 90.00 अनुसार) (U) 2 ब(cid:22) सी, एसएस 3x16.5+ 119.83 109.97 6.0(U)+ आरएमयू और 2012-13 एलई एचपीएसईबी 1x15 (31.3.2012 60 (एलई) कC ि(cid:22)थित के अनुसार) जजजज<<<<मममम ूूूूएएएए(cid:27)(cid:27)(cid:27)(cid:27)डडडड कककक====मममम ीीीीरररर 3 चेDन ई जे ए(cid:17) ड एसएस 5x4.66 39.14 3.98 23.30 आर एम ए(cid:17)ड 2013-14 केपीडीसी एलई (31.3.2012 (एलई) कC ि(cid:22)थित के अनुसार) 4 संबल, :सध, जे एसएस 2x11.3 34.17 18.89 - आर एडं एम 2012-13 ए(cid:17) ड केपीडीसी (31.3.2012 कC ि(cid:22)थित के अनुसार) 5 लोअर झेलम जे एसएस 3x35 101.30 78.25 15.00 आर एडं एम+ 2012-13 ए(cid:17) ड केपीडीसी (आरईएस) आरईएस (31.3.2012 कC ि(cid:22)थित के अनुसार) उउउउ(cid:30)(cid:30)(cid:30)(cid:30)तततत रररर 5555ददददशशशशेेेे 6 ओबरा, एसएस 3x33 43.14 12.7 99.00 आर एम ए(cid:17)ड 2015-16 यूपीजेवीएनएल एलई (31.03.12 (एलई) तक)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 123 (cid:9)(cid:9)(cid:9)(cid:9).... पपपप0000ररररययययोोोोजजजजननननाााा ससससीीीीएएएएसससस////एएएएससससएएएएसससस ''''थथ थथ ााााििििपपपपतततत ((((ककककररररोोोोड़ड़ड़ड़ 3333.... मममम))))2222 ललललााााभभभभ 4444णणणणेेेे ीीीी अअअअननननपपपपुुुु ााााललललनननन सससस....ंंंं एएएएजजजजसससस2222 ीीीी (cid:6)(cid:6)(cid:6)(cid:6)ममममतततताााा अअअअननननममममुुुु ााााििििननननतततत ववववाााा''''तततत ििििववववकककक ((((ममममगगगगेेेे ााााववववााााटटटट )))) ककककाााा ववववषषषष ++ ++ ((((ममममगगगगेेेे ााााववववााााटटटट)))) ललललाााागगगगतततत Bय य ((((5555ााााववववधधधधाााानननन)))) 7 $रहदं , एसएस 6x50 132.20 62.62 300.00 आर एम ए(cid:17)ड 2015-16 एलई यूपीजेवीएनएल (आरईवी) (31.03.12 (एलई) तक) उउउउ(cid:30)(cid:30)(cid:30)(cid:30)तततत ररररााााखखखखडडडडंंंं 8 पथरी, एसएस 3x6.8 92.82 13.8 20.40 आर एम ए(cid:17)ड 2013-14 एलई यूजेवीएनएल (31.03.12) (एलई) आआआआ>>>>ंंंं 5555ददददशशशशेेेे 9 Eीसैलम आरबी, एसएस 7x110 16.70 13.36 - आर एडं एम 2012-13 एपीजेनको (31.3.2012 कC ि(cid:22)थित के अनुसार ) 10 लोवर िसलेF, एसएस 4x115 8.75 6.66 - आर एडं एम 2012-13 एपीजेनको (31.3.2012 कC ि(cid:22)थित के अनुसार) 11 नागाजु(cid:15)न सागर, एसएस 1x110+ 33.35 13.90 - आर ए(cid:17) ड एम 2012-13 एपीजेनको 7x100.8 (31.03.2012 तक) ककककननननााााटटटट++++ कककक 12 नागझारी, एसएस 2x150+ 45.22 51.99 45.00 आर एम ए(cid:17)ड U 2013-14 यूिनट-4 से 6, 1x135 (31.03.2012 (U) केपीसीएल तक) ककककेेेेररररलललल 13 सबीरीिग$र, एसएस 5x55+ 104.36 96.95 300.00 आरएमयू और 2012-13 केएसईबी एलई 1x60 (31.03.2012 (एलई) + तक) 35.00(U) 14 इदमलायार, एसएस 2x37.5 11.70 5.45 - आर एडं एम 2012-13 केएसईबी (31.3.2012 कC ि(cid:22)थित के अनुसार)124 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] (cid:9)(cid:9)(cid:9)(cid:9).... पपपप0000ररररययययोोोोजजजजननननाााा ससससीीीीएएएएसससस////एएएएससससएएएएसससस ''''थथ थथ ााााििििपपपपतततत ((((ककककररररोोोोड़ड़ड़ड़ 3333.... मममम))))2222 ललललााााभभभभ 4444णणणणेेेे ीीीी अअअअननननपपपपुुुु ााााललललनननन सससस....ंंंं एएएएजजजजसससस2222 ीीीी (cid:6)(cid:6)(cid:6)(cid:6)ममममतततताााा अअअअननननममममुुुु ााााििििननननतततत ववववाााा''''तततत ििििववववकककक ((((ममममगगगगेेेे ााााववववााााटटटट )))) ककककाााा ववववषषषष ++ ++ ((((ममममगगगगेेेे ााााववववााााटटटट)))) ललललाााागगगगतततत Bय य ((((5555ााााववववधधधधाााानननन)))) 15 पा'रगल-कुथू, एसएस 4x8 96.10 2.34 32.00 आर एम ए(cid:17)ड 2015-16 एलई केएसईबी (31.3.2012 (एलई)+ कC ि(cid:22)थित के 4 (U) अनुसार) ततततििििममममललललननननााााडडडडुुुु 16 पे$रयार, एसएस 3x35+ 161.18 114.28 140.00 आरएमयू और 2013-14 एलई टीएनईबी 1x42 (31.03.2012 (एलई) + तक) 28.00(U) पपपपिििि(cid:3)(cid:3)(cid:3)(cid:3)मममम बबबबगगंंगगंं ाााालललल 17 मैथन, सीएस 2x20 49.05 3.76 40.00 (एलई) आर एम ए(cid:17)ड 2016-17 एलई यूिनट-1 और 3, (31.3.2012 डीवीसी कC ि(cid:22)थित के अनुसार) 18 जलढाका एसएस 3x9 88.62 74.28 27.00(एलई) आर एम ए(cid:17)ड 2012-13 (cid:22)ट ेशन-I, एलई (31.3.2012 ड(cid:28)(cid:29) य ूएसईबी कC ि(cid:22)थित के अनुसार) उड़ीसा 19 रGगाली एसएस 1x50 47.50 14.67 50(एलई) आर एम ए(cid:17)ड 2012-13 ओएचपीसी एलई (31.3.2012 कC ि(cid:22)थित के अनुसार) 20 हीराकुंड-II, एसएस 3x24 125.52 58.73 72.00 (एलई) आर एम ए(cid:17)ड 2014-15 एलई ओएचपीसी (31.3.2012 कC ि(cid:22)थित के अनुसार) अअअअससससमममम 21 कोिपली, नीपको सीएस 2x50 + 66.42 9.25 - आर ए(cid:17) ड एम 2013-14 और यूिनट 1 और 2x50 (31.3.2012 कC ि(cid:22)थित के 2 का $रफHबसमGट¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 125 (cid:9)(cid:9)(cid:9)(cid:9).... पपपप0000ररररययययोोोोजजजजननननाााा ससससीीीीएएएएसससस////एएएएससससएएएएसससस ''''थथ थथ ााााििििपपपपतततत ((((ककककररररोोोोड़ड़ड़ड़ 3333.... मममम))))2222 ललललााााभभभभ 4444णणणणेेेे ीीीी अअअअननननपपपपुुुु ााााललललनननन सससस....ंंंं एएएएजजजजसससस2222 ीीीी (cid:6)(cid:6)(cid:6)(cid:6)ममममतततताााा अअअअननननममममुुुु ााााििििननननतततत ववववाााा''''तततत ििििववववकककक ((((ममममगगगगेेेे ााााववववााााटटटट )))) ककककाााा ववववषषषष ++ ++ ((((ममममगगगगेेेे ााााववववााााटटटट)))) ललललाााागगगगतततत Bय य ((((5555ााााववववधधधधाााानननन)))) अनुसार) 22 खानदJग, नीपको सीएस 2x25 25.05 10.15 50.00 आर एम ए(cid:17)ड 2014-15 एलई (31.3.2012 (एलई) कC ि(cid:22)थित के अनुसार) उउउउपपपप जजजजोोोोड़ड़ड़ड़ (कककक) 4444666688883333 1111999933332222 999966666666 1111999977777777 जजजजााााररररीीीी ययययोोोोजजजजननननााााएएएए ंं ंं–––– ििििननननििििववववददददाााा 5555@@@@(cid:9)(cid:9)(cid:9)(cid:9)ययययााााधधधधीीीीनननन जजजज<<<<मममम ूूूूऔऔऔऔरररर कककक====मममम ीीीीरररर 23 गांडरे बल, जे ए(cid:17) ड एसएस 2x3+ 21.95 8.23 9.00 (एलई) आर एम ए(cid:17)ड 2016-17 एलई केपीडीसी 2x4.5 (31.3.2012 कC ि(cid:22)थित के अनुसार) उउउउ(cid:30)(cid:30)(cid:30)(cid:30)तततत रररर 5555ददददशशशशेेेे 24 माताटीला, एसएस 3x10.2 10.29 1.00 30.6 (एलई) आर एम ए(cid:17)ड 2013-14 यूपीजेवीएनएल एलई (31.3.2012 कC ि(cid:22)थित के अनुसार) उउउउ(cid:30)(cid:30)(cid:30)(cid:30)तततत ररररााााखखखखडडडडंंंं 25 खाितमा, एसएस 3x13.8 256.76 17.26 41.40 आर एम ए(cid:17)ड 2014-15 एलई यूजेवीएनएल (31.3.2012 (एलई) कC ि(cid:22)थित के अनुसार) 26 िच(cid:29)ल ा चरण-ख एसएस 4x36 472.00 - 28.8(U) + आरएमयू और 2015-16 यूजेवीएनएल एलई 144(एलई) 27 धकरानी, एसएस 3x11.25 113.18 - 33.75 आर एम ए(cid:17)ड 2015-16 एलई यूजेवीएनएल (एलई) 28 धालीपुर, एसएस 3x17 113.71 - 51.00 आर एम ए(cid:17)ड 2015-16 एलई यूजेवीएनएल (एलई) 29 ितलोथ, एसएस 3x30 163.75 - 90 (एलई) आर एम ए(cid:17)ड 2015-16 यूजेवीएनएल एलई126 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] (cid:9)(cid:9)(cid:9)(cid:9).... पपपप0000ररररययययोोोोजजजजननननाााा ससससीीीीएएएएसससस////एएएएससससएएएएसससस ''''थथ थथ ााााििििपपपपतततत ((((ककककररररोोोोड़ड़ड़ड़ 3333.... मममम))))2222 ललललााााभभभभ 4444णणणणेेेे ीीीी अअअअननननपपपपुुुु ााााललललनननन सससस....ंंंं एएएएजजजजसससस2222 ीीीी (cid:6)(cid:6)(cid:6)(cid:6)ममममतततताााा अअअअननननममममुुुु ााााििििननननतततत ववववाााा''''तततत ििििववववकककक ((((ममममगगगगेेेे ााााववववााााटटटट )))) ककककाााा ववववषषषष ++ ++ ((((ममममगगगगेेेे ााााववववााााटटटट)))) ललललाााागगगगतततत Bय य ((((5555ााााववववधधधधाााानननन)))) 30 कु(cid:29)ह ल, एसएस 3x10 115.44 - 30(एलई) आर एम ए(cid:17)ड 2015-16 एलई यूजेवीएनएल 31 िचKो, एसएस 4x60 201.25 - 240(एलई) आर एम ए(cid:17)ड 2015-16 एलई यूजेवीएनएल 32 खो-ी एसएस 4x30 165.85 - 120(एलई) आर एम ए(cid:17)ड 2015-16 यूजेवीएनएल एलई ततततििििममममललललननननााााडडडडुुुु 33 शोलायर-I, एसएस 2x35 40.68 - 14.00(U) + आरएमयू और 2016-17 एलई टीएनईबी 70.00 (एलई) झझझझााााररररखखखखडडडडंंंं 34 पंचेट, सीएस 1x40 58.22 1.99 40.00 आर एम ए(cid:17)ड 2016-17 एलई यूिनट-1, डीवीसी (31.3.2012 (एलई) कC ि(cid:22)थित के अनुसार) उउउउड़ड़ड़ड़ीीीीससससाााा 35 हीराकुंड-I यूिनट एसएस 2x37.5 296.83 0.25 75.00 आर एम ए(cid:17)ड 2014-15 एलई 5 ए(cid:17) ड 6, (31.3.2012 (एलई) ओएचपीसी कC ि(cid:22)थित के अनुसार) 36 बालीमेला, एसएस 6x60 160 - 360(एलई) आर एम ए(cid:17)ड 2016-17 एलई ओएचपीसी उउउउपपपप जजजजोोोोड़ड़ड़ड़ (खखखख) 1111333344440000....77775555 2222111188889999....99991111 22228888....77773333 1111333377777777....55555555 जजजजााााररररीीीी ययययोोोोजजजजननननााााएएएए ंं ंं–––– आआआआररररएएएएललललएएएए अअअअBBBBयययय ययययनननन ककककेेेे अअअअधधधधीीीीनननन ििििहहहहममममााााचचचचलललल 5555ददददशशशशेेेे 37 िग$र, एसएस 2x30 48.48 - 60.00 आर एम ए(cid:17)ड 2014-15 एलई एचपीएसईबी (एलई) आआआआ>>>>ंंंं 5555ददददशशशशेेेे 38 माचकुंड , एसएस 3x17 124.45 - 15.25 (U) आरएमयू और 2016-17 एलई एपीजेनको¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 127 (cid:9)(cid:9)(cid:9)(cid:9).... पपपप0000ररररययययोोोोजजजजननननाााा ससससीीीीएएएएसससस////एएएएससससएएएएसससस ''''थथ थथ ााााििििपपपपतततत ((((ककककररररोोोोड़ड़ड़ड़ 3333.... मममम))))2222 ललललााााभभभभ 4444णणणणेेेे ीीीी अअअअननननपपपपुुुु ााााललललनननन सससस....ंंंं एएएएजजजजसससस2222 ीीीी (cid:6)(cid:6)(cid:6)(cid:6)ममममतततताााा अअअअननननममममुुुु ााााििििननननतततत ववववाााा''''तततत ििििववववकककक ((((ममममगगगगेेेे ााााववववााााटटटट )))) ककककाााा ववववषषषष ++ ++ ((((ममममगगगगेेेे ााााववववााााटटटट)))) ललललाााागगगगतततत Bय य ((((5555ााााववववधधधधाााानननन)))) ((cid:22)ट ेशन-I) + और 114.75 3x21.25 (एलई) ((cid:22)ट ेशन-II) ककककेेेेररररलललल 39 शोलायार, एसएस 3x18 54.00 0.044 54.00 आर एम ए(cid:17)ड 2016-17 एलई केएसईबी (31.12.10 (एलई) कC ि(cid:22)थित के अनुसार) 40 कु$Lयाडी, एसएस 3x25 25.00 - 75.00 आर एम ए(cid:17)ड 2016-17 एलई केएसईबी (एलई) उउउउपपपपजजजजोोोोड़ड़ड़ड़ (गगगग) 333300004444 222255552222 0000....000044444444 333311119999 जजजजााााररररीीीी ययययोोोोजजजजननननााााएएएए ंं ंं–––– आआआआररररएएएएललललएएएए अअअअBBBBयययय ययययनननन ककककेेेे अअअअधधधधीीीीनननन आआआआ>>>>ंंंं 5555ददददशशेेशशेे 41 अपर िसलेF, एसएस 4x60 10.00 - - आर एडं एम 2016-17 एपीजेनको ततततििििममममललललननननााााडडडडुुुु 42 कोडयार चरण-I, एसएस 1x60 30.00 - 60.00 (एलई) आर एम ए(cid:17)ड 2015-16 एलई टीएनईबी 43 कोडयार चरण-II, एसएस 1x40 19.94 - 40.0(एलई) आर एम ए(cid:17)ड 2015-16 एलई टीएनईबी उउउउपपपप जजजजोोोोड़ड़ड़ड़ ((((गगगग)))) 333344440000 55559999....99994444 ---- 111100000000....00000000 जजजजोोोोड़ड़ड़ड़ 6666666666667777....77775555 4444444433333333....66667777 999999994444....77772222 3333777777773333....22225555 ((((कककक++++खखखख++++गगगग++++गगगग)))) [[[[222266666666....00005555((((UUUU)))) ++++ 3333444499992222....22220000 ((((एएएएललललईईईई)))) ++++ 11115555((((आआआआररररईईईईएएएएसससस))))128 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ससससििंंििंं (cid:26)(cid:26)(cid:26)(cid:26)ििििllllययययाााा::ंं::ंं आर एvड एम– नवीनीकरण और आधुिनक(cid:25)करण; आर एम एvड यू – नवीनीकरण, आधुिनक(cid:25)करण और ऑपरे[टग आर एम एvड एलई – नवीनीकरण, आधुिनक(cid:25)करण और जीवन िव8त ार आआआआररररएएएएममममयययय ूू ूूएएएएccccडड डड एलई – नवीनीकरण, आधुिनक(cid:25)करण, अपरे[टग और जीवन िव8त ार आर एvड एम+आरईएस -नवीनीकरण और आधुिनक(cid:25)करण + रे8ट ोरेशन; आर एम एvड एलई+आरईएस- नवीनीकरण, आधुिनक(cid:25)करण और जीवन िव8त ार + रे8ट ोरेशन; आर एम एvड यू+आरईएस – नवीनीकरण, आधुिनक(cid:25)करण और अपरे[टग + रे8टोरेशन एमडIj य ू – मेगावाट; आरईएस – रे8ट ोरेशन; यू – अपरे[टग; एलई – जीवन िव8त ार¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 129 अअअअ((((यय यय ाााायययय 5555 उउउउNNNNपप पप ााााददददनननन आआआआययययोोोोजजजजनननन 5555....0000 (cid:1)(cid:1)(cid:1)(cid:1)(cid:2)(cid:2)(cid:2)(cid:2)तत तत ााााववववननननाााा दशे म(cid:17) आPथक िवकास उQप ादन (cid:18)मता वृि(cid:23) 8थ ािपत करके बढ़ती ,ई िव#ुत मांग क(cid:25) पूPत करके <ा=त क(cid:25) जा रही ह।ै िव#ुत मांग म(cid:17) बढ़ोतरी होन े क(cid:25) आशा ह ै ले4कन इस मांग क(cid:25) पूPत हते ु उQ पादन के िलए उपलIध nधन संसाधन सीिमत ह।O इसके अलावा, उQप ादन (cid:18)मता म(cid:17) वृि(cid:23) को अकेले नह(cid:7) दखे ा जा सकता ह ै और इसे एक ऐस े पया2वरण म(cid:17) <ा=त 4कया जाना ह ै जो 8व Nप म(cid:17) 8व zछ ह3रत और 3टकाऊ हो। इसिलए, Cय ून काब2न वृि(cid:23) समय क(cid:25) मांग ह।ै इसक(cid:25) योजना ब,त सावधानीपूव2क बनानी चािहए dय *4क इसका िवकास आसानी से <ा=त नह(cid:7) 4कया जा सकता ह।ै 11व(cid:7) योजना अविध तक योजना बनाने क(cid:25) <4Bया का मुZय क(cid:17)f Jबद ु बड़ी उQप ादन (cid:18)मताए ं जोड़ना था िजनका उ()े य आपूPत और मांग के िचरकाल से चले आ रह े अंतर को पाटना था। जब भारत के अिधकांश \ामीण (cid:18)ेR* म(cid:17) िबजली क(cid:25) प,चं नह(cid:7) ह ै और जब4क शहरी भारत को िनयिमत Nप स े िबजली कटौती का सामना करना पड़ रहा ह,ै ऐसी ि8थित म(cid:17) आधार – भार (cid:18)मता म(cid:17) वृि(cid:23) करके ''पया2=त िव#ुत’’ सुिनिcत करने पर िवचार करना था। 11व(cid:7) योजना के दौरान 62,374 मेगावाट के म(cid:2)य ाविध ल%य क(cid:25) तुलना म(cid:17) 54,964 मेगावाट क(cid:25) (cid:18)मता वृि(cid:23) <ा=त क(cid:25) गई। भिव!य म(cid:17) ि8थित िभCन हो सकती ह ै dय *4क शहरी भारत दशे के कुल जीडीपी का आधे से अिधक जीडीपी <दान करता ह ै और 4दन के समय म(cid:17) इसक(cid:25) िबजली खपत अिधक होती ह ै और स=त ाहातं म(cid:17) रािR म(cid:17) खपत म(cid:17) काफ(cid:25) कमी हो जाती ह।ै यह मांग पैटन2 उन संयंR* के उपयुdत नह(cid:7) होती ह ै जो आधार के भार पर बनाए जाते ह।O इसिलए, कोयला – हाइrो – Cय ूिdलयर आधा3रत भार उQप ादन (cid:18)मता बढ़ाने को (cid:2)य ान दने े क(cid:25) नीित य#िप आव)य क हो सकती ह ै ले4कन 12व(cid:7) योजना और उसके बाद क(cid:25) अविध के दौरान पया2=त नह(cid:7) हो सकती ह।ै इस <कार, अित3रdत पैरामीटर* िजन पर (cid:2)य ान दने े और =ल ाJनग क(cid:25) आव)य कता ह,ै उपयुdत <कार के िव#तु संयंR* के ज3रए हमारे िस8ट म म(cid:17) Kय 8त तम समय क(cid:25) (cid:18)मता म(cid:17) वृि(cid:23) करके और 3रजव2 माPजन से िव#ुत <णाली क(cid:25) िव)व सनीयता और लचीलापन ह।ै इस अ(cid:2)य ाय म(cid:17) 12व(cid:7) और 13व(cid:7) योजना अविधय* म(cid:17) (cid:18)मता बढ़ाने क(cid:25) आव)य कता का आकलन करने के िलए योजना म (cid:17) अपनाई गई उQप ादन योजना के िस(cid:23)ांत* पर <काश डाला गया ह।ै ये िस(cid:23)ांत Cय ून काबन2 नीित के िस(cid:23)ांत* के अनुNप ह O और तैयार िव#ुत <णाली पीGकग पावर और ि8पJनग 3रजव2 के िलए िवशेष Nप क(cid:25) योजना बनाकर (cid:18)मता आव)य कता के अित3रdत िव)व सनीयता और लचीलेपन के अित3रd त पैरामीटर* क(cid:25) पूPत करने म(cid:17) भी स(cid:18)म ह।ै 5555....1111 भभभभााााररररतततत मममम $$ $$ििििववववIIIIततुुततुु उउउउNNNNपप पप ााााददददनननन ककककेेेे ििििववववकककक++++पप पप हमारे दशे म(cid:17) िव#ुत उQप ादन के संसाधन सीिमत ह O अत: इसिलए Cय ून काब2न वृि(cid:23) नीित को अपनाया जाना ह,ै सभी उQप ादन िवकjप * का अिधकतम उपयोग 4कया जाना ह।ै Cय ूनतम काब2न उQस जन2 को सुिवधाजनक बनाने के िलए िविभCन <ौ#ोिगक िवकjप * क(cid:25) भी खोज करने क(cid:25) आव)य कता ह।ै िव#ुत उQप ादन के िलए nधन िवकjप िनbन िलिखत ह O : • परंपरागत qोत – हाइrो, Cय ूिdलयर, <ाकृितक गसै , कोयला और िल‚न ाइट। • अपारंप3रक qोत – सौर, पवन, बायोमास, oव ारीय, िजयो थम2ल, अपिश!ट से ऊजा2, हाइrोजन / nधन सले आ4द। हाइrो और Cय ूिdलयर ससं ाधन* सिहत 8व Nप म(cid:17) नवीकरणीय ऊजा2 के अपारंप3रक संसाधन* पर बल दने ा Cय नू काब2न वृि(cid:23) नीित <ा=त करने क(cid:25) 4दशा म(cid:17) सबसे अिधक महQव पूण2 और दरू गामी पहल* म(cid:17) स े एक ह।ै तथािप, अपारंप3रक qोत आमतौर पर गैर-<ेषणीय होते ह O और साथ ही इनसे मंहगी िबजली िमलती है, इसिलए इनका130 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] काया2Cव यन एक सीमा तक ही सीिमत रखा जाता ह।ै िव#ुत संयंR* क(cid:25) 8थ ापना िव#ुत उQप ादन के उपयु2dत परंपरागत qोत* के आधार पर क(cid:25) जाती ह।ै qोत क(cid:25) Nिच <Qय ेक संयंR क(cid:25) िवशेषता के आधार पर िनभ2र होती ह ै और अनेक कारक* पर िनभ2रता के अनुसार nधन क(cid:25) Nिच पर िनण2य िलया जाता ह।ै इन कारक* म(cid:17) मुZय u उQप ादन क(cid:25) िमतKय यता, nधन भंडार, nध क(cid:25) उपलIध ता, संयंR के <चालन क(cid:25) गितक(cid:25) और पया2वरण पर <भाव। इनम(cid:17) िव#ुत उQप ादन के अपारंप3रक qोत* aारा वृि(cid:23) क(cid:25) जाती ह।ै 5555....2222 उउउउNNNNपप पप ााााददददनननन ययययोोोोजजजजननननाााा ककककेेेे ििििसससस(cid:31)(cid:31)(cid:31)(cid:31)ााााततंंततंं हमारी योजना बनाने क(cid:25) <4Bया म(cid:17) तीन मुZय पहलुE पर काय2 करना और िवचार करना शािमल ह:ै • सतत िवकास के िस(cid:23)ातं * के अनुNप मांग पैटन2 क(cid:25) पूPत हते ु िव#ुत उQप ादन (cid:18)मता म(cid:17) वृि(cid:23) • िव)व सनीयता और लचीलापन जैसी <णाली क(cid:25) वांिछत प3रचालनाQम क िवशेषताE को पूरा करना (अलग – अलग मांग क(cid:25) पूPत)। • संसाधन* का सबसे अिधक स(cid:18)म उपयोग अथा2त कोयला आधा3रत उQप ादन, िमि}त <शीतन, तापन और ऊजा2 (सी सी एच पी) और िवत3रत उQप ादन म(cid:17) आधुिनकतम <ौ#ोिगक(cid:25) अपनाना। िविभCन प3रयोजनाE क(cid:25) िमतKय यता और ि8थित सिहत इस रा!" ीय िव#तु योजना को तैयार करते समय Kय वहाय2ता क(cid:25) दिृ ~ से इन उपयु2dत तीन पहल* पर िवचार 4कया गया ह।ै 5555....2222....1111 ससससववंंववंं ििृृििृृ (cid:31)(cid:31)(cid:31)(cid:31) ििििववववककककाााासससस हमारे दशे का िवकास ही हमारा अंितम ल%य ह ै िजसम (cid:17) आPथक िवकास, पया2वरणीय गुणवQत ा और सामािजक समानता को बनाए रखना शािमल ह।ै इससे यह भी सुिनिcत होगा 4क हमारी भावी पीि़ढय* क(cid:25) आव)य कताE के साथ समझौता 4कए िबना हमारी वत2मान आव)य कताE को पूरा करने के िलए यह िवकास 4कया जाता ह।ै िव#ुत िवकास का महQव और <ासंिगकता 8व zछ और \ीन पावर के अंतगत2 िनिहत ह।ै इस <कार का िवकास िव#ुत उQप ादन के िलए एक उपयु2dत nधन / <ौ#ोिगक(cid:25) क(cid:25) Nिच पर िनभ2र करता ह।ै तदनुसार, इस योजना म (cid:17) नवीकरणीय ऊजा 2 qोत* और साथ ही दशे के सतत िवकास को बढ़ावा दने े वाली <ौ#ोिग4कय* पर आधा3रत प3रयोजनाE के िवकास को (cid:2)य ान म(cid:17) रखा जाता ह।ै सबसे महQव पूण2 Cय ून काब2न नीित पहल िव#तु उQप ादन के िलए संसाधन* क(cid:25) Nिच ह।ै परंपरागत संसाधन* अथा2त हाइrो, Cय ूिdलयर और थम2ल पर आधा3रत योजना म (cid:17) (cid:18)मता िव8त ार काय2Bम* क(cid:25) (cid:18)मता का उपयोग करके 4कए गए अ(cid:2)य यन* के प3रणाम8व Nप प3रयोजनाE का चयन 4कया जाता ह ै ता4क 18व(cid:7) ई पी एस 3रपोट2 म(cid:17) िनधा23रत अनुसार मांग क(cid:25) पूPत क(cid:25) जा सके। इन अ(cid:2)य यन* को करते समय नवीकरणीय ऊजा2 qोत* िव#ुत और उQप ादन पर िवचार 4कया जाता ह।ै योजना बनाने के उ()े य से अपनाई गई मांग 18व(cid:7) ई पी एस मांग अनुमान ह।ै यह मांग <योग म(cid:17) लाई जा रही ऊजा2(cid:18)म <ौ#ोिगक(cid:25) उपयोग और अपनाए जा रह े ऊजा2 संर(cid:18)ण उपाय* के इ8त ेमाल पर आधा3रत ह।ै इसिलए, अपनाई गई योजना नीित Cय ून काब2न नीित िवकास के अनुNप ह।ै 5555....2222....2222 पपपप////ररररचचचचााााललललननननााााNNNNमम मम कककक ललललचचचचीीीीललललाााापपपपनननन औऔऔऔरररर ििििववववYYYYवव वव ससससननननीीीीययययतततताााा nधन के qोत और िव#ुत उQप ादन क(cid:25) संबंिधत <ौ#ोिग4कयां अनेक और िविवध ह।O तदनसु ार, प3रचालन क(cid:25) <Qय ेक क(cid:25) अपनी िवशेषता ह।ै हमारी िव#ुत <णाली क(cid:25) मांग म(cid:17) भी 4दन के समय, मौसम, तथा 8थ ािनक अवि8थित के साथ िभCन होती ह।ै इसिलए, हर समय भार के साथ बराबर उQप ादन के िलए न केवल पया2=त (cid:18)मता क(cid:25) अव8थ ापनाE क(cid:25) आव)य कता होती ह ै बिjक उQप ादन (cid:18)मता भी 4क8म के <ित संवेदी भी होती ह।ै अपने उQप ादन को बदलने और ऐसा करने क(cid:25) <Qय ेक क(cid:25) अपनी िवशेषताए ं होती ह।O तदनुसार, उQप ादन के <कार पर िनण2य के समय <णाली क(cid:25) इस अपे(cid:18)ा पर भी िवचार 4कए जाने क(cid:25) आव)य कता ह।ै इसिलए िव#तु क(cid:25) पया2=त ता और माRा के अलावा, ‘िव)व सनीयता’ और ‘गुणवQत ा’ के पहलुE को (cid:2)य ान म(cid:17) रखते ,ए योजना बनान े क(cid:25) <4Bया के काय2(cid:18)ेR म(cid:17) िव8त ार करने क(cid:25) आव)य कता ह।ै दशे के लगभग सभी िह8स * म(cid:17) लोड शेJडग / िबजली कटौती होने के कारण उपभोdत ा इनवट2र* और डीजल जेनसेट* स े बैक-अप पावर का सहारा लने े के िलए बा(cid:2)य हो जाते ह।O बैक-अप िबजली लेने म(cid:17) एक औसत¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 131 उपभोdत ा aारा खच2 क(cid:25) गई रािश <ित केएचडIj य ू 50 पैसे से लेकर कई Nपय* तक होती ह।ै 24x7 िव#ुत k आपूPQ के आ)व ासन के बदल े उपभोdत ा अपनी िबजली खपत के िलए अिधक <ीिमयम दने े का भी इzछ ुक होता ह ै जो बैक-अप पावर qोत* को रखने और चलाने क(cid:25) प3रहाय2 लागत* को खच2 करने के िलए उनक(cid:25) आव)य कता का िनराकरण करेगा। िबजली कंपिनय* aारा ''िव)व सनीय <भार’’ के Nप म(cid:17) यह अित3रdत क(cid:25)मत समPपत पीGकग संयंR* से ''4दन का समय’’ पावर <ा=त करने का आधार होगा। पीGकग संयंR* से उzच क(cid:25)मत उzच तर (cid:18)मता, पया2वरण पर Cय ून <भाव और इन संयंR* aारा लचीलेपन को संभव बनाने क(cid:25) तुलना म(cid:17) सतं ुिलत होनी चािहए। इसके अलावा, पीGकग संयंR बेस-भार संयंR* क(cid:25) अjप अविध के िलए चल(cid:17)गे, कुल िमलाकर ली गई िबजली का भा3रत औसत काफ(cid:25) अिधक नह(cid:7) होगा। ((((कककक)))) ििििववववIIIIततुुततुु कककक1111 ििििववववYYYYवव वव ससससननननीीीीययययतततताााा िव)व सनीय िव#ुत <णाली प3रचालन के िलए 8थ ािपत प3रचालन मानदडं जैसे िस8ट म वोjट ेज का रख-रखाव तथा 8व ीकाय2 सीमाE के अतं ग2त Œ(cid:25)dव (cid:17)सी बनाए रखना जैसे मानदडं * के अनुसार जारी संतुलन क(cid:25) आव)य कता होती ह।ै 4दन भर और पूरे मौसम के दौरान उपभोdत ा मांग म(cid:17) प3रवत2न को आव)य क होने पर उQप ादन िनयंRण aारा पूरा 4कया जाता ह।ै िव)व सनीय <णाली क(cid:25) मुZय िवशेषताए ं िनbन िलिखत ह:O • सामCय प3रि8थितय* के दौरान <णाली को 8व ीकाय2 सीमाE के अंतग2त रखा जाता ह।ै • यह <णाली िव)व सनीय <ासिं गकताE के प)च ात 8व ीकाय2 Nप से काय2 करती ह।ै • यह <णाली अि8थरता और <पात <भाव को सीिमत रखती ह ै जब कभी ये घटनाए ं होती हO। • िस8ट म क(cid:25) सुिवधाए,ं सुिवधा रे[टग के अंतग2त उCह (cid:17) प3रचािलत करके अ8व ीकाय2 (cid:18)ित से सुरि(cid:18)त रखती ह।ै • िस8ट म क(cid:25) सQय िन!ठ ा इसके न!ट हो जाने पर तQक ाल बहाल क(cid:25) जाती ह।ै • इस <णाली म(cid:17) िस8ट म घटक* के िनिcत और यथोिचत <Qय ािशत आउटेज <णाली घटक* को (cid:2)य ान म(cid:17) रखकर हर समय िव#ुत उपभोdत ाE को िबजली, पावर और ऊजा2 आव)य कताE क(cid:25) आपूPत क(cid:25) (cid:18)मता ह।ै िस8ट म म(cid:17) िव)व सनीयता हािसल करने के िलए िस8ट म म(cid:17) पया2=त 3रजव2 (cid:18)मता, चBण और साथ ही गैर चBण आवश ् यकताE क(cid:25) योजना तैयार क(cid:25) जानी ह।ै प3रचालन, 8व ािमQव , माडिे लटी और 3रजव2 क(cid:25) <कृित से संबंिधत पहलुE का भी िनधार2 ण 4कए जाने क(cid:25) आव)य कता ह।ै भार क(cid:17)f* क(cid:25) तुलना म(cid:17) 3रजव2 उQ पादन (cid:18)मता का 8थ ान भी महQव पूण2 ह।ै रा!" ीय िव#ुत नीित म(cid:17) हमारे िस8ट म म(cid:17) 5 <ितशत 3रजव2 माPजन क(cid:25) शत2 ह।ै इस पर 12व(cid:7) और 13व(cid:7) योजनाE के दौरान =ल ाJनग (cid:18)मतावध2न आव)य कता के समय िवचार 4कया गया। यह 3रजव2 माPजन कैसे <दान 4कया जाए, इसका िववरण इस अ(cid:2)य ाय म(cid:17) बाद म(cid:17) <8 तुत 4कया गया ह ै (‘योजना दिृ ~कोण’ के खंड 5.4 के अंतग2त)। ((((खखखख)))) पपपप////ररररचचचचााााललललनननन ककककाााा ललललचचचचीीीीललललाााापपपपनननन बेस-लोड उQप ादन के िलए िनyद!ट िस8ट म म(cid:17) अjप समय के अंदर मांग म (cid:17) बदलाव के िलए स4BयNप स े या स(cid:18)मतापूण2 <ित4Bया दने े के िलए िवशेषताE क(cid:25) कमी होगी। मांग म(cid:17) बदलाव के अलावा, उQप ादन म(cid:17) उस समय Kय ापक बदलाव क(cid:25) संभावना रहती ह ै जब नवीकरणीय ऊजा2 संयंR* का 8थ ािपत आधार नवीकरणीय ऊजा2 qोत* से अपनी आव)य कता के िलए िड8क ॉम पर बा(cid:2)य ता के फल8व Nप बढ़ जाती ह ै (आर पी ओ क(cid:25) पूPत हते ु)। चूं4क िस8ट म ि8थरता के िलए सभी घटनाE म(cid:17) मांग के साथ बराबर के उQप ादन क(cid:25) आव) यकता होती ह,ै इसिलए प3रवत2नशील मांग के िलए Qव 3रत <ित4Bया हते ु जेनरेटर* का लचीलापन और (cid:18)मता उपयुdत उQप ादन संयंR* के ज3रए िस8ट म म(cid:17) आरंभ क(cid:25) जाए। अ<Qय ािशत मांग और कुछ इकाइय* क(cid:25) अचानक अ<Qय ािशत आउटेज के कारण उQप Cन अित3रdत मांग क(cid:25) पPू त हते ु िस8ट म समथ2 होना चािहए। भारत म(cid:17) राoय * के Kय 8त समय क(cid:25) मांग िaप(cid:18)ीय करार* के aारा अCय राoय * से िबजली खरीदकर या Œ(cid:25)dव (cid:17)सी – िलdड मूjय * पर असामाियक इंटरच(cid:17)ज (यू आई) क(cid:25) <4Bया aारा और कभी – कभी िबजली कटौती aारा कुछ सीमा तक पूरी क(cid:25) जाती ह।ै यहां सƒ Œ(cid:25)dव (cid:17)सी बOड (50.2 से 49.7 ह‡ज2) िवकिसत दशे * म(cid:17) अनुमत सीमा स े काफ(cid:25) अिधक ह।ै तथािप, भिव!य म(cid:17) इस Œ(cid:25)dव (cid:17)सी बOड म(cid:17) कमी आने क(cid:25) संभावना ह ै और इससे Kय 8त तम समय132 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] क(cid:25) उपलIध माPजन आव)य कता या Œ(cid:25)dव (cid:17)सी इंटरच(cid:17)ज <4Bया के ज3रए कमी होगी। हाइrो िव#ुत संयंR* को अचानक Kय 8त समय क(cid:25) पूPत हते ु Qव 3रत आरंभ 4कया जा सकता ह ै ले4कन यह सुिवधा उन कुछ राoय * तक सीिमत ह ै िजसके पास वष2 भर पया2=त जल भंडारण होता ह।ै पीGकग संयंR पया2वरणीय दिृ ~ से अनुकूल होने चािहए और ये उQस ज2न मानक* का पालन कर(cid:17) ता4क इCह (cid:17) लोड क(cid:17)f* के िनकट अव8थ ािपत 4कया जा सके। ये ऐसे होने चािहए 4क इCह (cid:17) तQक ाल शुN (बंद) 4कया जा सके और शी… रOप अप 4कया जा सके। िविभCन संयंR भार म(cid:17) इनक(cid:25) उzच (cid:18)मता और समान होनी चािहए। य े ‘बारह मासी’ संयंR होने चािहए और वष2 भर उपलIध होन े वाले nधन के उपयोग वाले होने चािहए। िव#ुत <णाली म (cid:17) 3रजव 2 के संबंध म(cid:17) िवदशे म(cid:17) िवकिसत िव#ुत बाजार* म(cid:17) आकि8मकताE क(cid:25) पूPत हते ु कुछ 3रजव2 रखने का चलन ह।ै आवृि’ म(cid:17) कमी अथा2त 0.1 से 0.2 ह‡ज2 के िलए <थम Qव 3रत <ित4Bया 8व चािलत उQप ादन िनयंRण (ए जी सी) के ज3रए 5 स े 30 सGे कड म (cid:17) 4कसी हाट 3रजव 2 संयंR (ि\ड म (cid:17) सबसे बड़ी एकल इकाई के बराबर) आन लाइन लाना ह।ै दसू रे कदम के Nप म(cid:17) तजे 3रजव2 िव#तु संयंR (एफ आर पी पी) 4 स े 15 िमनट म (cid:17) आरंभ 4कए जाते ह O और भार भरने के िलए रOप 4कए जात े ह O िजसके प)च ात ए जी सी संयंR 3रजव2 मोड को 3र"ीट करेगा। तीसरे कदम के Nप म(cid:17) 3रजव2 िव#तु संयंR* को (आर आर पी पी) 45 से 60 िमनट बदला जाता ह ै िजसके प)च ात एफ आर पी पी संयRं अपने 8ट Oड – बाई मोड म(cid:17) वापस हो जात े ह।O 3रजव2 क(cid:25) कितपय परत(cid:17) जसै े 4क िवकिसत दशे * म(cid:17) योजना बनायी जाती है, म(cid:17) िविभCन 3रजवU के प3रचालन क(cid:25) नbय ता का (cid:2)य ान भी रखा जाता ह।ै इसिलए, हॉट 3रजव2 िजCह (cid:17) सेGकड* के अंदर ही चलाना आव)य क ह,ै को सामाCय तया 8व चािलत उQप ादन िनयंRण (ए जी सी) के ज3रए <दान 4कया जाता ह।ै Qव 3रत बदला जान े वाला 3रजव2 उQप ादन qोत स े होगा जी एस जी qोत* से अिधकतम म(cid:17) लेन े के िलए 4 से 15 िमनट के अंदर रOJपग के सम(cid:18) ह।ै तथािप, 3र=ल ेसमट(cid:17) 3रजव 2 (cid:18)मता धीम(cid:17) कायर2 त उQप ादन qोत स े हो सकती ह ै ता4क काय2रत 3रजवU स े तेजी से अिधकार म (cid:17) ली जा सके। तदनुसार, <Qय ेक 3रजव2 (cid:18)मता उपयुdत उQप ादन qोत से होनी चािहए िजसम (cid:17) अपेि(cid:18)त रOप अप और रOप डाउन िवशेषताए ं ह*। नbय ता प3रचालन <दान करने के िलए =ल ाJनग 3रजव 2 के इन िस(cid:23)ांत* को अपनी =ल ाJनग <ोसेस म(cid:17) अपनाया गया ह ै िजसका िववरण खंड 5.4 म(cid:17) 4दया गया ह।ै 5555....2222....3333 ससससससंंससंं ााााधधधधनननन'''' ककककाााा ससससफफफफलललल उउउउपपपपययययोोोोगगगग िव#ुत उQप ादन के िलए nधन दलु 2भ ह ै अत: इसका उपयोग अित िवेवेकपूण2 तरीके स े 4कया जाना चािहए। पया2वरणीय दिृ ~ से यह अिनवाय2 ह ै 4क <ित के . सीएएल nधन ऊजा2 उQप ादन यथासभं व अिधक ह।ै इससे िव#तु उQप ादन <4Bया के दौरान होने वाला <दषू ण Cय ूनतम होगा। संसाधन* का अिधकतम सफल उपयोग के िलए 4कए गए / 4कए जा रह े िविभCन उपाय अथा2त कोयला आधा3रत उQप ादन; िमि}त शीतल, तापन और िव#ुत (सी सी एच पी) और िवत3रत उQप ादन के िलए आ#तन <ौ#ोिगक(cid:25) अपनाने का िववरण अ(cid:2)य ाय -4 म(cid:17) 4दया गया ह।ै 5555....3333 7777लल लल ााााmmmmननननगगगग टटटटूूूू++++सस सस – 7777लल लल ााााmmmmननननगगगग ममममााााडडडडलललल'''' ककककाााा ििििववववववववररररणणणण उQप ादन से संबंिधत कायU के िलए िनbन िलिखत कं=य ूटर सा|टवेयर माडल* का इ8त ेमाल करके सी ई ए िव8त तृ िव8त ार कर रहा ह:ै (i) एक(cid:25)कृत <णाली =ल ाJनग (आई एस पी एल ए एन) (ii) िव#ुत उQप ादन िव8त ार िव)ल ेषण <णाली (ई जी ई ए एस) =ल ाJनग माडल* क(cid:25) <मुख िवशेषताE के संबंध म(cid:17) नीचे चचा2 क(cid:25) गई ह।ै 5555....3333....1111 एएएएकककक1111ककककृृृृतततत (cid:1)(cid:1)(cid:1)(cid:1)णणणणााााललललीीीी 7777ललललााााmmmmननननगगगग ((((आआआआईईईई एएएएसससस पपपपीीीी एएएएलललल एएएए एएएएनननन)))) ममममााााडडडडलललल पूरी <णाली के िलए (cid:18)मता और एक(cid:25)कृत Nप से पारेषण Jलकेज िव8त ार, दोन* के िलए िवकjप * का आकलन करन े क(cid:25) (cid:18)मता होनी चािहए ता4क अिधकतम समाधान <ा=त 4कया जा सके। योजनाकार* के सbम ुख मुZय सम8य ाए ं न केवल उQप ादन (cid:18)मता आव)य कता और िव)व सनीयता को अिधकतम करने से संबंिधत ह O बिjक लोड क(cid:17)f*, nधन प3रवहन नेटवक2 और पारेषण ि\ड के िव8त ार के संबंध म(cid:17) संयंR के 8थ ान िनधा2रण क(cid:25) भी ह।ै िव#ुत <णाली =ल ाJनग आमतौर पर दीघ2काल के िलए क(cid:25) जाती ह ै और =ल ाJनग माडल म(cid:17) यथोिचत समय के अंदर और कम से कम <यास* से अनेक प3रद)ृ य * का िव)ल ेषण करन े क(cid:25) (cid:18)मता होनी चािहए।¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 133 आई एस पी एल ए एन माडल के पास इन <णाली =ल ाJनग मु(* क(cid:25) उQप ादन (cid:18)मता, पारेषण नेटवक2 और nधन प3रवहन के िलए इ!ट मत िव8त ार क(cid:25) <मुख िवशेषताE का िव)ल ेषण करने के िलए संकेताQम क =ल ाJनग औजार के Nप म(cid:17) इनके समाधान क(cid:25) (cid:18)मता ह।ै आई एस पी एल ए एन माडल उ()े य परक काय2 िजसम(cid:17) प3रयोजना क(cid:25) पूंजीगत लागत िजसम (cid:17) (वाPषक), ओ एडं एम लागत (वाPषक), nधन लागत, nधन प3रवहन लागत आ4द शािमल ह,ै Cय ूनीकरण पर आधा3रत कम िव#ुत िवकास योजना के अनुसार काय2 करता ह।ै रेखीय <ो\ाJमग <ितपादन के आधार पर यह माडल अिधक वैकिjपक जानकारी आवधारणाE के संबंध म(cid:17) इ!ट तम िव8त ार योजनाE को <भावी Nप से तैयार करने म(cid:17) स(cid:18)म ह।ै इ!ट तमीकरण का मापदडं समी(cid:18)ाधीन वष 2 के िलए कुल वाPषक <णाली लागत के Cय ूनतम छूट सिहत वत2मान लागत है, इसम(cid:17) सभी नई सुिवधाE (उQप ादन संयंR, पारेषण लाइने आ4द) क(cid:25) वाPषक पूंजी लागत और अनरु (cid:18)ण लागत तथा उपलIध न कराई गई ऊजा 2 क(cid:25) लागत भी शािमल ह।ै आई एस पी एल ए एन माडल म(cid:17) पूPत क(cid:25) जाने वाली मांग के आधार पर 4क <दायगी िव#ुत Cय नू तम ह,ै के आधार पर एक िवशेष पी एल एफ म (cid:17) िव#ुत संयंR* के प3रचालन पर िवचार 4कया जाता ह।ै तदनुसार, महं ग े nधन वाले थम2ल 8ट ेशन Cय ून पी एल एफ पर चल(cid:17)गे अथा2त केवल Kय 8त मांग अविध के दौरान और न 4क Kय 8त अविध से बाहर। माडल के अनुसार, सभी डी जी आधा3रत 8ट ेशन Cय ूनतम पी एल एफ पर प3रचािलत ह*गे। कुछ गैस आधा3रत 8ट ेशन Cय ून पी एल एफ पर भी प3रचािलत ह*गे। बावजूद ह3रयाणा, पंजाब, राज8थ ान, गुजरात, तिमलनाडु राoय * ि8थत कोयल आधा3रत िव#मान कुछ लोड स(cid:17)टर और गुजरात तथा महारा!" राoय म(cid:17) ि8थत कुछ आयाितत कोयला आधा3रत 8ट ेशन इन 8ट ेशन* के उzच <दायगी nधन लागत के कारण Cय ून संयंR लोड कारक (पी एल एफ) पर चल रह े ह।O तथािप, कम लागत िव8त ार योजना सदा Kय वहाय2 योजना नह(cid:7) होती ह।ै Kय वहायत2 ा क(cid:25) दिृ ~ से भिू म, जल आ4द क(cid:25) उपलIध ता संयंR क(cid:25) 8थ ापना के िलए िविभCन मंजू3रयां <ा=त करना, मुZय संयंR के िलए आडर2 दने े आ4द क(cid:25) जांच 4कए जाने क(cid:25) आव)य कता ह।ै 5555....3333....2222 ििििबबबबजजजजललललीीीी उउउउNNNNपप पप ााााददददनननन ििििवववव(cid:2)(cid:2)(cid:2)(cid:2)तत तत ाााारररर ििििववववशशशश लल्् लल्् षषेेषषेे णणणण (cid:1)(cid:1)(cid:1)(cid:1)णणणणााााललललीीीी ((((ईईईई जजजजीीीी ईईईई एएएए एएएएसससस)))) िव#ुत उQप ादन िव8त ार िव)ल ेषण <णाली (ई जी ई ए एस) एक सा|टवेयर पैकेज ह ै िजसका आशय िव#तु उQप ादन िव8त ार <णाली क(cid:25) िव8त ार योजना बनाना ह।ै इस =ल ाJनग मॉउल म(cid:17) िव#ुत <णाली का प3रचालन अनुकरण संभाKय ता ह।ै िव#ुत <णाली म(cid:17) भार माRा और समय बदलावा दोन* के संदभ2 म (cid:17) ह।ै आदश2 उQप ादन, िव)व सनीयता सूचक अथात2 संभवतया लोड क(cid:25) (cid:18)ित (एल ओ एल पी), ऊजा2 <दQत नह(cid:7) क(cid:25) गई (ई एन एस) का अनुमािनत मान और उ()े य काय2 को Cय ूनतम करके 4कसी िव8त ार िव#ुत योजना के िलए 3रजव2 माPजन, जो िव#मान और <ितब(cid:23) उQप ादन 8ट ेशन* के प3रचालन स े जुड़ी वत2मान लागत है, अथा2त वाPषक / संतुिलत पूंजी लागत तथा नए उQप ादन 8ट ेशन* क(cid:25) प3रचालन लागत और ऊजा2 ''<दQत नह(cid:7)’’ क(cid:25) लागत ह।ै ई जी ई ए एस माडल <Qय ेक ऐसी योजना के िलए अपने उ()े य कायU और िव)व सनीयता सूचक* सिहत कई िव8त ार योजनाए ं दने े के िलए स(cid:18)म ह।ै इ!ट तम िव#ुत योजना वह योजना ह ै िजसके िलए िव)व सनीयता सचू क योजनाकार aारा िनधा3रत कितपय मापदडं के अनुNप ह* और उ()े य काय 2 Cय ूनतम हो। ई जी ई ए एस माडल 8व Nप म(cid:17) संभाKय ता वाला होने के कारण यह उQप ादन िव8त ार =ल ाJनग क(cid:25) लंबी र(cid:17)ज <दान करता ह ै dय *4क भिव!य म (cid:17) कई वषU तक िबजली आपूPत क(cid:25) िव)व सनीयता के ब,त उपयोगी माRाQम क उपाय <दान करता ह ै और साथ ही िव#मान और <ितब(cid:23) <णाली क(cid:25) कुल प3रचालन लागत और नई <णाली को लगाने और चलाने क(cid:25) लागत का संकेत दते ा ह।ै य#िप, उQप ादन (cid:18)मता क(cid:25) सम\ आव)य कता का आकलन ई जी ई ए एस का इ8त ेमाल करके, प3रवहन यो‚य nधन का इ8त ेमाल करने वाले उQप ादन 8ट ेशन* का 8थ ान िनधार2 ण आई एस पी एल ए एन का उपयोग करके 4कया जाता ह।ै आई एस पी एल ए एन के अंतग2त पारेषण <णाली क(cid:25) मुZय िवशेषताए ं भी <ा=त क(cid:25) जाती ह।O 5555....4444 आआआआययययोोोोजजजजननननाााा पपपपहहहहलललल 11व(cid:7) योजना स े आगे एक =ल ाJनग ए<ोच िजसका सम\ उ()े य ‘ऊजा2 क(cid:25) पया2=त ता’ ह ै (आधार – भार (cid:18)मता बराबर या अिधकतम अनुमािनत मांग के ज3रए)। इससे अिधकांश समय के िलए <णाली का उप – इ!ट तम134 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] प3रचालन होगा। यह बेस लोड संयंR* जैसे कोयला और (Cय ूिdलयर nधन क(cid:25) िव#ुत उQप ादन <ौ#ोिग4कय* म (cid:17) मौजूद कमजोर टन2डाउन (cid:18)मताE के कारण ह।ै इसके अलावा, िबना Kय 8त समय के दौरान 50 <ितशत कम अंडर लोJडग कोयला संयंR* के इस पैटन 2 स े उप इ!ट तम पी एल एफ म (cid:17) प3रचालनरत िव#ुत संयंR* क(cid:25) कमजोर (cid:18)मता 8त र पर हो जाता ह।ै अत: बेस लोड (cid:18)मताE, पीGकग समाधान* और 3रजव 2 (cid:18)मताE के अिधक इ!ट तम िम}ण के िलए योजना बनाना अिनवाय2 ह।ै बेस – लोड (cid:18)मता ‘थोक िव#ुत’ आव)य कता का (cid:2)य ान रखगे ी – जब4क अCय िस8ट म आपरेटर को मौसमी 8प ाइक और 4दन के समय के बदलाव – मांग म(cid:17) <Qय ािशत या अ<Qय ािशत का (cid:2)य ान रखन े के िलए पया2पत 3रजव2 (cid:18)मता और महQव पूण2 टूल <दान करेगा। इस <कार क(cid:25) संतुिलत <णाली गितशील <ित4Bया िवशेषताए ं अब तक उQक ृ!ट ह*गी और यह उzच तर िव)व सनीयता म(cid:17) योगदान करेगा dय *4क असूचीब(cid:23) आंत3रक और अंत(cid:18)hRीय 8थ ानातं रण चुनौती <8त ुत कर(cid:17)गे, इसिलए लोड और अनुगbय समाधान* राoय ि\ड 8त र पर ही वरीयत: िनधार2 ण 4कया जाए और =ल ान 4कया जाए। इससे 8थ ानीय पीGकग आव)य कताE क(cid:25) Qव 3रत, 3रयल टाइम <ित4Bया सुिनिcत होगी। =ल ाJनग दिृ ~कोण िनbन िलिखत Bम म(cid:17) ह:O 1111)))) अअअअििििखखखखलललल भभभभााााररररतततत ललललोोोोडडडड अअअअववववििििधधधध ककककवववव (cid:22)(cid:22) (cid:22)(cid:22)ततततययैैययैै ाााारररर ककककररररननननाााा एक अिखल भारत लोड अविध कव2 (एल डी सी) सभी राoय * के िलए <ित घंटा संकलन से सृिजत 4कया गया। आंकड़* को िविभCन (cid:18)ेRीय लोड िड8प ैच क(cid:17)f* और राoय लोड िड8प ैच क(cid:17)f* से गत तीन वषU के िलए एकR 4कए गए थे। इन आंकड़* का िव)ल ेषण 4कया गया और शेJडग, 4Œdव (cid:17)सी करेdश न, सिृ जत िबजली कटौती और 4कCह (cid:7) आंकड़ा Rु3टय* के संदभ2 म(cid:17) िवसंगितय* को सही 4कया गया। Kय 8त समय क(cid:25) मांग को यूिनटी म(cid:17) समायोिजत 4कया गया और अCय हर घंटे क(cid:25) मांग को तदनसु ार कम 4कया गया। यह आ)व ासन 4दया गया था 4क अिखल भारत एल डी सी Kय 8त समय मांग और ऊजा2 क(cid:25) मािसक आव)य कता दोन* क(cid:25) पूPत करता ह ै और अंकगिणतीय मॉडल का इ8त ेमाल करके सी ई ए aारा समय –––– समय पर वाPषक Nप से <कािशत 4कया जाता ह।ै एक अिaतीय समक(cid:18) अिखल भारत लोड अविध कव2 का सृजन 2016-17 के िलए ऊजा2 आव)य कता और पीक लोड के आधार पर 4कया गया। एक अनोखा लोड अविध कव2 का वण2न नीचे िचR 5.2 म(cid:17) 4कया गया ह:ै ििििचचचचKKKK 5555....2222---- अअअअििििखखखखलललल भभभभााााररररतततत ललललोोोोडडडड अअअअववववििििधधधध ककककवववव (cid:22)(cid:22) (cid:22)(cid:22) ((((एएएएलललल डडडडीीीी ससससीीीी)))) अनुमािनत अिखल भारत एल डी सी 2016-17¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 135 2222)))) उउउउNNNNपप पप ााााददददनननन ििििवववव(cid:2)(cid:2)(cid:2)(cid:2)तत तत ाााारररर अअअअ((((यय यय ययययनननन उपयु2dत अिखल भारत एल डी सी को ई जी ई ए एस सा|टवेयर म(cid:17) जानकारी के Nप म(cid:17) डाला जाता ह।ै उQप ादन िव8त ार अ(cid:2)य यन, हाइrो, नवीनीकरण, गैस और Cय ूिdलयर प3रयोजनाE को <ाथिमकता दी जा सके और अपने म(cid:17) िनिहत फायद* के कारण प3रयोजनाE को चलान े के िलए आव)य कता के तौर पर शुN 4कया जा सके। काय2Bम म(cid:17) काया2िCवत क(cid:25) जा रही कोयला आधा3रत प3रयोजनाE क(cid:25) मांग आव)य कता को पूरा करन े के िलए इस काय2Bम म(cid:17) कोयला आधा3रत प3रयोजनाE का संकेत 4दया गया ह।ै हाइrो और गैस आधा3रत प3रयोजनाए ं U िजCह (cid:17) काया2Cव यन के िविभन चरण* के अंतग2त प3रयोजनाE म(cid:17) से 12व(cid:7) योजना के दौरान काया2िCवत 4कए जान े क(cid:25) संभावना ह,ै पर =ल ाJनग <योजन के िलए अव)य क चलाई जाने वाली प3रयोजना के Nप म(cid:17) िवचार 4कया गया ह।ै 12व(cid:7) योजना म(cid:17) Cय ूिdलयर पावर कारपोरेशन स े सूचना के आधार पर Cय ूिdलयर प3रयोजनाE पर लाभ हते ु िवचार 4कया गया। 12व(cid:7) योजना म (cid:17) चPचत नवीकरणीय (cid:18)मता नवीन और नवीकरणीय ऊजा2 मंRालय क(cid:25) सूचना के अनसु ार ह।ै ऊजा2 आव)य कता क(cid:25) पूPत हते ु केवल नवीकरणीय (cid:18)मता पर िवचार 4कया गया और न 4क Kय 8त समय क(cid:25) िबजली आव)य कता पर। लागत िमतKय यता के आधार पर <णाली क(cid:25) मांग को पूरा करन े के िलए उQप ादन क(cid:25) 4कस म् क(cid:25) लोJडग का िववरण िचR 5.2 म(cid:17) 4दया गया ह।ै ////ररररजजजजवववव (cid:22)(cid:22) (cid:22)(cid:22)(cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा जैसा 4क एन ई पी म(cid:17) िनधा23रत ह,ै 5 <ितशत ि8पJनग 3रजव2 <दान 4कया जाना ह।ै यह 12व(cid:7) योजना के अंत तक लगभग 10,000 मेगावाट क(cid:25) (cid:18)मता के अनुNप ह।ै इस 3रजव2 (cid:18)मता क(cid:25) आव)य कता को इन संयंR* से िनयामक उपलIध ता क(cid:25) तुलना म(cid:17) सामाCय प3रचालन प3रि8थितय* के अंतग2त 5 <ितशत तक कोयला आधा3रत संयंR* क(cid:25) समान Nप स े घटती उपलIध ता aारा योजना म(cid:17) शािमल 4कया गया ह।ै उपयु2dत सभी िवकjप * का समय से ब,त Qव 3रत <ित4Bया ,ई है, इसिलए पया2=त Nप से हाट 3रजव2, Qव 3रत <ित8थ ापन 3रजव2 और <ित8थ ापन 3रजव2 <दान 4कए। पपपपीीीीnnnnककककगगगग (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा a पीGकग भार कई कारण* से होता ह।ै इसका अनुमान लगाया जा सकता ह ै जैस े सुबह और सायकाल का Kय 8त तम समय। Jसचाई आव)य कताE को पूरा करते समय ऐसा हो सकता ह ै जब कई हजार पंप सेट लगातार चलते ह।O शहरी भार म(cid:17) कितपय कारण* से बढ़ोतरी हो सकती ह ै (उदाहरण के िलए 4दjल ी म(cid:17) गPमय* के \ी!म वातानुकूलन भार) या पीGकग कमजोर, नवीकरणीय ऊजा2 qोत जैस े पावर टरबाइन* स े उQप ादन म(cid:17) अचानक कमी होना। Qव 3रत <ित4Bया िवशेषताE वाले संयंR जो उCह (cid:17) ‘आदश2’ संयंR बनात े ह,O का उपयोग अनुमािनत दिै नक, 4दन म (cid:17) Kय 8त समय और मौसमी Kय 8त ता क(cid:25) आव)य कता क(cid:25) पूPत हते ु 4कया जा सकता ह।ै नbय ता <दान करने के िलए ि\ड आपरेटर के हिथयार का एक अिभCन िह8स ा हो सकते ह।O पीGकग (cid:18)मता Qव 3रत <ित4Bया िव#तु संयंR* स े आन े क(cid:25) आव)य कता ह।ै इसिलए भंडारण क(cid:25) (cid:18)मता वाल े अ\णी पं=ड 8ट ोरेज हाइrो संयंR Kय 8त म समय म(cid:17) िबजली <दान करत े ह।O इसके अलावा, गैसा आधा3रत / डीजल आधा3रत संयंR अथा2त ओ सी जी टी और इंजन Kय 8त समय क(cid:25) िबजली के िलए अनुकूल ह।O दशे म(cid:17) बड़ े भार क(cid:17)f* म(cid:17) िवत3रत पीक (cid:18)मता का होना भी उपयुdत समझा गया ह,ै इसके िलए शायद 5 महानगर* म (cid:17) स े <Qय ेक म (cid:17) 400 मेगावाट (cid:18)मता वाली गुणवQत ा, िव)व सनीय और नbय िव#ुत आपूPत करने के साथ 12व(cid:7) योजना के दौरान लगभग 2000 मेगावाट (cid:18)मता अिभवृि(cid:23) के िलए पया2=त होगा। आआआआययययोोोोजजजजननननाााा (cid:1)(cid:1)(cid:1)(cid:1)3333````ययययाााा मममम $$ $$ननननववववीीीीककककररररणणणणीीीीयययय (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा नवीकरणीय (cid:18)मता के असZं य अंतPनिहत लाभ ह O और इसिलए परंपरागत िबजली संयंR* स े (cid:18)मता वृि(cid:23) आव)य कता का अनुमान लगाते समय अ(cid:2)य यन* म (cid:17) इस पर िवचार 4कया गया ह।ै (cid:18)मता अिभवृि(cid:23) अ(cid:2)य यन म (cid:17) पवन और सौर ऊजा2 से अव)य चलने वाले संयंR के Nप म(cid:17) <मुखता के साथ िनधा23रत 4कया गया था। अपेि(cid:18)त uoh शेष (cid:18)मता वृि(cid:23) का अनुमान <णाली क(cid:25) मांग क(cid:25) पूPत हते ु लगाया गया था। करणीय क(cid:25) सभं ािवत उपलIध ता के अनुNप िविभCन प3रद)ृ य* का अनुमान लगाया गया। अपारंप3रक qोत ऊजा2 <ेषण पर उपलIध ता न 4क लगातार रीित के आधार पर िवचार 4कया जा सकता ह।ै136 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 3333)))) पपपपररुुररुु ााााननननीीीी थथथथममममलल(cid:22)(cid:22)लल(cid:22)(cid:22) इइइइककककााााइइइइयययय'''' ककककोोोो बबबबददंंददंं ककककररररननननाााा Zy पुराने थम िव#तु संयंR* के संबंध म(cid:17) सूचना संकिलत क(cid:25) गई थी और (cid:18)मता वृि(cid:23) आव)य कता का अनुमान लगाते समय सभी अ(cid:18)म थम2ल इकाइय* को धीरे–धीरे और Bिमक Nप से समा=त करन े पर िवचार 4कया गया। 12व(cid:7) और 13व(cid:7) योजना के दौरान <Qय ेक 4000 मेगावाट को हटाया गया था। 4444)))) ससससपपंंपपंं ूणूणूणूण (cid:22)(cid:22) (cid:22)(cid:22)ििििAAAAडडडड ििििववववफफफफलललल हहहहोोोोनननन ेे ेेककककेेेे पपपपYYYYचच चच ाााातततत ;;;;लल लल ककैैककैै (cid:2)(cid:2)(cid:2)(cid:2)टट टट ााााटटटट(cid:22)(cid:22) (cid:22)(cid:22) कककक1111 ससससििुुििुु ववववधधधधाााा जैसा 4क ऊपर सुझाव 4दया गया ह ै 4क <Qय ेक 5 महानगर* म(cid:17) 400 मेगावाट लगभग 2000 मेगावाट क(cid:25) पीGकग (cid:18)मता <दान क(cid:25) जा सकती ह।ै यह सुिवधा ि\ड के िवफल रहने क(cid:25) दशा म(cid:17) Iल ैक 8ट ाट2 अप <दान करने मे भी उपयोगी होगी। प3रचालन क(cid:25) उzच (cid:18)मता के िमि}त ताप और िव#ुत संयंR ि\ड िवफल होने के तरु ंत बाद Iल कै 8ट ाट2 सुिवधाए ं <दान कर सकते ह।O 5555)))) 3333ददददनननन ककककेेेे ससससममममयययय ((((टटटटीीीी ओओओओ डडडडीीीी)))) टटटटैै//ैै//ररररफफफफ रा!" ीय िव#ुत नीित और रा!" ीय टै3रफ नीित के अनसु ार राoय आयोग* के िलए 4दन के समय (टी ओ डी) मीट[रग शुN करना अिनवाय2 ह ै ता4क Kय 8त तम समय क(cid:25) िबजली मांग को कम 4कया जा सके। लोड कव 2 को बराबर करने क(cid:25) दिृ ~ से िजसके िलए Kय 8त समय क(cid:25) मांग को कम करना अिनवाय2 ह ै और Kय 8त समय के परे लोड क(cid:25) खपत बढ़ा दने े / बढ़ाना वांछनीय ह ै और इसक(cid:25) <णाली से अपे(cid:18)ा क(cid:25) जाती ह।ै इस े िनbन िलिखत प(cid:23)ितय* aारा 4कया जा सकता ह:ै • उपभोdत E को Kय 8त समय से अCय था अपनी खपत को िश|ट करने के िलए <ोQस ाहन दने ा • Kय 8त समय के दौरान उपभोdत ाE को खपत करने को िनNQस ािहत करना • उपयु2dत दोन* का िम}ण। उपयु2dत प(cid:23)ितय* के िलए Kय 8त समय तक / Kय 8त समय के अलावा अलग–अलग समय के िलए अलग – अलग टै3रफ क(cid:25) आव)य कता ह।ै यह सव2िव4दत ह ै 4क िबजली क(cid:25) क(cid:25)मत को िनयंिRत करके अलग–अलग उपभोdत ाE को 4दन के एक समय से दसू रे समय म(cid:17) अपनी खपत को या तो कम करने / बढाने या िश|ट करने के िलए <े3रत करना संभव ह।ै अथात2 उपभोdत ा को 4दन के दौरान अपनी खपत पैटन2 को बदलने के िलए <े3रत 4कया जा सकता ह।ै मांग प(cid:18) <बंधन के िलए एक हिथयार के Nप म(cid:17) टी ओ डी मीट[रग के ज3रए Kय 8 त समय क(cid:25) मांग म(cid:17) कमी करना काफ(cid:25) लाभदायक ह,ै यह िबजली कंपनी को अपनी उपQप ादन िव#ुत खरीद आव)य कता जो आपूPत क(cid:25) सम\ लागत को कम करता ह ै / िव#ुत कंपनी के िलए दसू रा लाभ यह ह ै 4क कुछ पीक लोड को ऑफ पीक लोड म(cid:17) िश|ट करने के कारण <णाली के भार कारक म(cid:17) सुधार आता ह ै िजसस े लोड कव2 बराबर रहता ह।ै बेहतर भार कारक उQप ादन 8ट ेशन* के संयंR भार कारक म(cid:17) सुधार लाता ह ै और इस <कार उQप ादन लागत कम आती ह।ै उपभोdत ा अंतत: Kय 8त तम समय के अलावा, कम दर* पर िबजली <ा=त करके इसस े लाभांिवत होते ह O और िबजली कंपिनय* क(cid:25) आपूPत लागत* म(cid:17) कमी करके भी लाभांिवत ह*गे। िबजली कटौती क(cid:25) घटना म(cid:17) भी Kय 8त समय मांग म(cid:17) कटौती म(cid:17) कमी आयेगी। य#िप, टी ओ डी टै3रफ कई राoय * म(cid:17) अिधक खपत वाल े उपभोdत ाE के िलए लागू ह ै / 4फर भी यह अभी खुदरा 8त र पर लागू नह(cid:7) ह।ै टी ओ डी मीट[रग को उन उपभोdत ाE के िलए लागू 4कया जा सकता ह ै जहां Kय 8त तम समय क(cid:25) िबजली क(cid:25) मांग को Kय 8त समय क(cid:25) मांग के अलावा िश|ट करने क(cid:25) सभं ावना होती ह।ै खुदरा 8त र पर टी ओ डी टै3रफ लगाने के िलए सभी घरेलू उपभोdत ाE को एक नया मीटर दने ा होगा जो Kय 8त समय और Kय 8त समय के अलावा खपत क(cid:25) गई इकाइय* को अलग–अलग कर सकेगा। 5.5 उउउउपपपपससससहहंंहहंं ाााारररर 12व(cid:7) और 12व(cid:7) योजना म(cid:17) (cid:18)मता वृि(cid:23) क(cid:25) योजना बनाने के काम पर इस अ(cid:2)य ाय म (cid:17) वPणत िस(cid:23)ांत* के अनुसार अ(cid:2)य ाय-6 म(cid:17) 4कया गया ह।ै 3रजव 2 / माPजन / (cid:18)मता 3रजव2 <दान करके िव)व सनीयता और Kय 8त समय तक 3रजव2 आव)य कताE का (cid:2)य ान रखन े के िलए उपयुdत रOप अप और रOप-डाउन <ित4Bया (cid:18)मता <दान करके नbय ता उQत रोQत र अ(cid:2)य ाय* म(cid:17) (cid:18)मता वृि(cid:23) क(cid:25) योजना बनाते समय एक महQव पूण2 पहलू बनता है।¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 137 अअअअ((((यय यय ाााायययय 6666 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) औऔऔऔरररर 11113333वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ििििललललएएएए उउउउNNNNपप पप ााााददददनननन (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा अअअअििििभभभभववववििृृििृृ (cid:31)(cid:31)(cid:31)(cid:31) ककककाााायययय``(cid:22)(cid:22)``(cid:22)(cid:22) मममम 6666....0000 (cid:1)(cid:1)(cid:1)(cid:1)(cid:2)(cid:2)(cid:2)(cid:2)तत तत ााााववववननननाााा इस अ(cid:2)य ाय म(cid:17) 12 व(cid:7) योजना के दौरान आव)य क उQप ादन (cid:18)मता अिभवृि(cid:23) और 13व(cid:7) योजना के दौरान आव)य क संभािवत (cid:18)मता अिभवृि(cid:23) का मूjय ांकन अ(cid:2)य ाय 5 म(cid:17) िव8त ार स े 4दए गए आयोजना िस(cid:23)ातं * और मानदडं * के आधार पर 4कया गया ह ै । आव)य क (cid:18)मता अिभवृि(cid:23) का मूjय ांकन करने के िलए केCf ीय िव#ुत <ािधकरण aारा अ(cid:2)य यन 4कए गए ह।O योजना के दौरान संभािवत लाभ हते ु प3रयोजनाE क(cid:25) एक सूची (ऐसी प3रयोजनाए ं जो पहल े से िवचाराधीन ह)O तैयार क(cid:25) गयी ह ै िजसम(cid:17) स े प3रयोजनाE क(cid:25) ि8थित के आधार पर सवा2िधक Kय वहाय2 प3रयोजनE का चयन 4कया जाता ह।ै पारंप3रक ऊजा2 qोत* म(cid:17) स े हाइrो और Cय ूिdलयर qोत* को 8व zछ और ह3रत qोत माना जाता ह,ै अत: अ(cid:2)य यन के दौरान इन प3रयोजनाE को अिनवाय 2 Nप से सचं ािलत क(cid:25) जाने वाली प3रयोजना मानत े ,ए <ाथिमकता दी गयी ह,ै परंतु इसके िलए <Qय ेक प3रयोजना क(cid:25) Kय वहायत2 ा और वत2मान ि8थित को (cid:2)य ान म(cid:17) रखा गया ह ै । शेष बची प3रयोजनाE म(cid:17) स े थम2ल प3रयोजनाE का चयन प3रयाजनाE क(cid:25) आव)य कता और तैयारी के आधार पर 4कया जाता ह।ै गैस प3रयोजना क(cid:25) 8थ ापना 4कये जाने और गैस क(cid:25) पया2=त उपलIध ता सुिनि)च त करने के िलए <यास 4कये जाने क(cid:25) आव)य कता ह।ै पीGकग (cid:18)मता और आरि(cid:18)त (cid:18)मता क(cid:25) आयोजना भी आयोजना िस(cid:23)ातं * के अनुसार तैयारी क(cid:25) गयी ह ै । हालां4क यह सुिनिcत करने के िलए भी आव)य क सावधानी बरती गयी ह ै 4क आव)य कता से अिधक (cid:18)मता क(cid:25) योजना तैयार न क(cid:25) जाए dय *4क हमारा जोर इ!ट तम समाधान पर ह।ै 6666....1111 भभभभााााररररतततत मममम $$ $$पपपपााााररररंंंंपपपप////ररररकककक DDDDोोोोतततत'''' सससस ेे ेेउउउउNNNNपप पप ााााददददनननन 6666....1111....1111 हहहहााााइइइइ<<<<ोोोो 60% लोड घटक पर भारत के जल िव#ुत संसाधन* का अनुमान 84 जीडIj य ू ह।ै औसतन लगभग 30% के लोड घटक पर 150 जीडIj य ू क(cid:25) 8थ ािपत (cid:18)मता संभव ह,ै इसम(cid:17) छोटी जल िव#तु प3रयोजनाE (25 मेगावाट से कम (cid:18)मता वाली) क(cid:25) 15 जीडIj य ू (cid:18)मता शािमल नह(cid:7) ह ै । कम काबन2 वृि(cid:23) रणनीित से यह सुिनिcत होगा 4क 8व zछ जल िव#ुत का अिधकतम इ8त ेमाल पीक लोड को पूरा करने के िलए 4कया जाएगा और सभी नयी प3रयोजनाE क(cid:25) िडजाइन इस ल%य को (cid:2)य ान म(cid:17) रखकर तैयार क(cid:25) जानी चािहए। हालां4क भारत क(cid:25) जल िव#तु (cid:18)मता का पूण2 िवकास जहां एक ओर तकनीक(cid:25) Nप से Kय वहाय2 है, वह(cid:7) दसू री ओर जलािधकार, प3रयोजना <भािवत लोग* के पुनवा2स और पया2वरण संबंधी Jचताए/ं मु( े उनके सम(cid:18) होते ह O िजनका समाधान 4कया जाना चािहए। 6666....1111....2222 >>>>यय यय ििूूििूू 0000ललललययययरररर दशे म(cid:17) <ाकृितक यूरेिनयम क(cid:25) सीिमत उपलIध ता के िलए Cय ूिdलयर उQप ादन भी सीिमत ह।ै परमाणु ऊजा 2 िवभाग ने दशे म(cid:17) वष2 2020 तक 20,000 मेगावाट क(cid:25) 8थ ािपत Cय ूिdलयर पावर (cid:18)मता िवकिसत करने क(cid:25) योजना बनाई ह।ै आज क(cid:25) ि8थित के अनसु ार, 8व दशे ी nधन पर आधा3रत <थम चरण का काय2Bम <गित पर ह ै और यह प3रपdव 8त र तक प,चं गया ह।ै 500 एमडIj य ूई पीएफबीआर (<ोटोटाइप फा8ट ि‰डर 3रयेdट र) के िनमा2ण के साथ दसू रे चरण के काय2Bम का भी आगाज कर 4दया गया ह।ै ऐसी आशा क(cid:25) जाती ह ै 4क वष2 2020 तक 500 एमडIj य ूई या उससे अिधक (cid:18)मता वाली चार नयी यूिनट(cid:17) 8थ ािपत क(cid:25) जाएगं ी। तQप )च ात् ब,त स े L एफबीआर 8थ ािपत 4कय े जाएगं े। जब एफबीआर के ज3रए उपयुdत तर क(cid:25) (cid:18)मता 8थ ािपत हो जाती ह ै तो तृतीय चरण के ज3रये िव#तु उQप ादन के िलए थो3रयम का <योग शुN 4कया जाएगा और दीघा2विध म(cid:17) इसका लाभ उठाया जाएगा।138 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] य#िप आगामी 15 वषU म(cid:17) Cय ूिdलयर ऊजा2 का योगदान कम ही रहगे ा, 4फर भी ऊजा 2 क(cid:25) दिृ ~ से 8व यं म(cid:17) पया2=त k¡ 8त र पर यह तक 4क कमजोर उQप ादन भी दीघा2विध म(cid:17) लाभदायक िस(cid:23) होगा और इससे हम (cid:17) यह सुझाव िमलता ह ै 4क थो3रयम का <योग करते ,ए Cय ूिdलयर पावर के िवकास क(cid:25) 4दशा म(cid:17) <यास 4कए जाने चािहए। परमाणु सहयोग पर यूएसए और भारत के बीच ‘123 करार’ पर ह8त ा(cid:18)र 4कये जाने और भारत को परमाण ु nधन क(cid:25) आपूPत के िलए एनएसजी से छूट <दान 4कये जाने के प3रणाम8व Nप यह अपे(cid:18)ा क(cid:25) जाती ह ै 4क दशे म(cid:17) कुछ िमR दशे * स े िवदशे ी <ौ#ोिगक(cid:25) के साथ कुछ Cय ूिdलयर =ल ांट भारत म(cid:17) 8थ ािपत 4कए जाएगं े। भारत के िलए आयाितत परमाणु nधन और <ौ#ोिगक(cid:25) क(cid:25) उपलIध ता Cय ूिdलयर पावर =ल ांट* से Qव 3रत (cid:18)मता अिभवृि(cid:23) म(cid:17) सहायक होगी। 11व(cid:7)/12व(cid:7) योजनाE के दौरान आयाितत <ौ#ोिगक(cid:25) से 3रयेdट र* का िनमा2ण शुN 4कए जाने स े यह अपे(cid:18)ा क(cid:25) जाती ह ै 4क 13व(cid:7) योजना से आगे उनक(cid:25) 8थ ापना हो जाएगी। मेगा(cid:18)मता वाले Cय ूिdलयर पाकU के िवकास क(cid:25) भी अपे(cid:18)ा ह।ै 6666....1111....3333 गगगगससैैससैै गैस क(cid:25) सीिमत उपलIध ता के कारण गैस आधा3रत 8ट ेशन* क(cid:25) भी संZय ा सीिमत रखी जा रही ह।ै अत: दशे म(cid:17) कोयला आधा3रत थम2ल िव#ुत उQप ादन भिव!य म(cid:17) भी अ\णी बना रहगे ा। अत: 8व zछ कोयला <ौ#ोिग4कय* सिहत पया2वरण क(cid:25) दिृ ~ स े अनुकूल िविभCन <ौ#ोिग4कय* के िवकास पर जोर 4दया जाना आव)य क ह।ै िव#तु उQप ादन के िलए nधन के िवकjप के संबंध म(cid:17) ऊजा 2 सरु (cid:18)ा पहलुE को (cid:2)य ान म(cid:17) रखते ,ए 8थ ायी िवकास के िस(cid:23)ांत लागू ह*गे। िव#ुत (cid:18)ेR सिहत दशे म(cid:17) गैस क(cid:25) बढ़ रही मांग के अनुNप गैस क(cid:25) आपूPत और उQप ादन गित नह(cid:7) पकड़ पा रह े ह।O दशे म(cid:17) गैस आधा3रत पावर 8ट ेशन* के िलए गैस क(cid:25) आपूPत पया2=त नह(cid:7) है, यहां तक 4क पावर 8ट ेशन* के िलए पूव2 म(cid:17) क(cid:25) गयी गैस आवंटन <ितब(cid:23)ताE को भी पूरा नह(cid:7) 4कया गया। 90% पीएलएफ पर पावर 8ट ेशन* को <चािलत करन े के िलए 82.04 एमएमएससीएमडी क(cid:25) वा8त िवक आव)य कता क(cid:25) तुलना म (cid:17) अ<ैल 2012 के दौरान 51.94 एमएमएससीएमडी औसत गसै आपूPत क(cid:25) गयी जब4क यह लगभग 56.98% पीएलएफ पर इन 8ट ेशन* को <चािलत करने के िलए पया2=त थी। वष2 2009-10 म(cid:17) भारत सरकार ने मौजूदा पावर =ल ांट* के िलए िव#तु (cid:18)ेR को <थम चरण म(cid:17) केजी डी6 बेिसन के 40 एमएमएससीएमडी के कुल उQप ादन म(cid:17) से 18 एमएमएससीएमडी गैस आवं3टत क(cid:25) िजससे गैस आधा3रत पावर 8ट ेशन* क(cid:25) मानक (cid:18)मता का सदपु योग करन े म(cid:17) सहायता िमली। केजी बेिसन का उQप ादन 80 एमएमएससीएमडी तक बढ़ने क(cid:25) उbम ीद थी। अत: बाद म(cid:17) ईजीओएम ने केजी बेिसन से अित3रdत गैस पावर सेdट र को थोक म(cid:17) आवं3टत क(cid:25)। यह आवंटन आं(cid:127) <दशे क(cid:25) प3रयोजनाE के िलए 75% पीएलएफ और गैर एपी प3रयोजनाE के िलए 70% पीएलएफ पर आधा3रत था। इस अित3रdत आवंटन म(cid:17) मौजूदा िव#ुत प3रयोजनाE के िलए फम2 आधार पर 12.29 एमएमएससीएमडी गैस और फाल बैक आधार पर 12 एमएमएससीएमडी गैस शािमल ह,O िजनम(cid:17) 2009-10 के दौरान 8थ ािपत क(cid:25) जानवे ाली प3रयोजनाए ं भी शािमल ह।O हालां4क िपछले कुछ वषU म(cid:17) केजी बेिसन से घटे ,ए उQप ादन के आलोक म(cid:17) यहां तक 4क पावर =ल ांट* को फम2 आधार पर आवं3टत गैस क(cid:25) भी आपूPत नह(cid:7) क(cid:25) जा रही ह ै और दशे को भारी माRा म(cid:17) उQप ादन हािन हो रही ह।ै अध2ह3रत पावर होने के नात े गैस पावर =ल ांट* को बढ़ावा दने े क(cid:25) आव)य कता ह ै िजससे 4क हमारे काब2न उQस ज2न के आंकड़ े कम हो सक(cid:17), साथ ही पारंप3रक कोयला आधा3रत पावर =ल ांट* क(cid:25) तलु ना म(cid:17) गैस आधा3रत पावर =ल ांट* के और भी अCय कई अंतPनिहत लाभ होत ह।O वतम2 ान म(cid:17) दशे म(cid:17) लगभग 13,000 मेगावाट गैस आधा3रत (cid:18)मता िविभCन िनमा2ण चरण* पर ह।ै परंतु वत2मान म(cid:17) नये पावर =ल ांट* को गैस क(cid:25) अनुपलIध ता दशे म(cid:17) गैस आधा3रत पावर =ल ांट* के िवकास म(cid:17) एक गंभीर बाधा के Nप म(cid:17) उभरकर सामने आयी ह।ै वत2मान म (cid:17) मौजूदा पावर =ल ांट ब,त ही कम पीएलएफ पर <चािलत 4कये जा रह े ह O और कुछ पावर =ल ांट गैस क(cid:25) अनुपलIध ता के कारण बेकार बंद पड़ े ह।O केजी बेिसन से पावर प3रयोजनाE को गैस क(cid:25) वा8त िवक आपूPत शुN होने के बाद मौजूदा प3रयोजनाE के िव8त ार के साथ-साथ ह3रत (cid:18)ेR प3रयोजनाE सिहत लगभग 1,30,000 मेगावाट (cid:18)मता वाली गैस आधा3रत¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 139 पावर प3रयोजनाE क(cid:25) 8थ ापना हते ु ब,त से <8त ाव <ा=त ,ए ह।O हालां4क इन प3रयोजनाE के िलए आबंटन हते ु गैस उपलIध नह(cid:7) ह।ै (cid:18)मता अिभवृि(cid:23) ल%य को पूरा करने और काब2न डाइऑdस ाइड (CO2) के कुल उQस ज2न को कम करने के िलए लगभग 20,000 से 25,000 मेगावाट (cid:18)मता वाली गैस आधा3रत प3रयोजनE (गैस क(cid:25) उपलIध ता के अ(cid:2)य धीन) क(cid:25) योजना तैयार करना आव)य क ह।ै गैस क(cid:25) अिनिcतता को (cid:2)य ान रखत े ,ए 12व(cid:7) योजना के िलए दो प3रद)ृ य तैयार 4कए गए ह।O हालां4क यह िसफा3रश क(cid:25) जाती ह ै 4क दशे म(cid:17) िव#ुत क(cid:25) भारी कमी को (cid:2)य ान म (cid:17) k¡ रखते ,ए जह तक घरेलू गैस आवंटन का संबंध ह ै तो िव#ुत प3रयोजनाE को उzच <ाथिमकता दी जानी चािहए dय *4क गैस =ल ांट* से काबन2 उQस जन2 ब,त कम माRा म(cid:17) होता ह ै जो परो(cid:18) Nप से िव#ुत (cid:18)ेR से काबन2 डाइऑdस ाइड के उQस ज2न को कम करने म(cid:17) सहायक िस(cid:23) होगा। 6666....1111....4444 ककककोोोोययययललललाााा////ििििललललHHHHनन नन ााााइइइइटटटट दशे म(cid:17) कोयला के आरि(cid:18)त भंडार लगभग 277 िबिलयन टन के आसपास ह।ै कुल उQप ा4दत कोयले का लगभग 70% भाग क(cid:25) खपत केवल कोयला (cid:18)ेR म(cid:17) क(cid:25) जाती ह।ै हालां4क भूिम के अिध\हण म(cid:17) िविभCन सम8य ाE और 8व ीकृितयां <ा=त होने म(cid:17) िवलबं के कारण कोयला Iल ॉक* के िवकास म (cid:17) ब,त सी बाधाए ं आती ह।O चूं4क अिधकांश कोयला Iल ॉक वन (cid:18)ेR म(cid:17) अवि8थत होत े ह O अत: उनके िलए वन 8व ीकृित <ा=त करना एक बड़ी सम8य ा ह।ै कैि=टव कोयला Iल ॉक सामाCय त: अwात होते ह,O इसिलए उनके िवकास म (cid:17) अिधक समय लगता ह।ै 11व(cid:7) पंचवष(cid:12)य योजना के दौरान िव#तु प3रयोजनाE क(cid:25) 8थ ापना क(cid:25) वत2मान ि8थित और कोल इंिडया िलिमटेड क(cid:25) उQप ादन योजना के अनुसार 11व(cid:7) पचं वष(cid:12)य येाजना के सीमांत वष2 म(cid:17) घरेलू कोयले क(cid:25) मांग और उपलIध ता के बीच अंतर लगभग 53 मी3"क टन था। उपयु2dत कमी को पूरा करन े के िलए िव#ुत कंपिनय* को 35 मी3"क टन कोयला आयात करन े क(cid:25) सलाह दी गयी। हालां4क वष 2 2011- 12 के दौरान कोयले का वा8त िवक आयात लगभग 28 मी3"क टन था। आयात 4कए गए कोयले का िम}ण <ौ#ोिगक(cid:25)य Nप से लगभग 10-15% तक ही व् यवहाय2 ह।ै अत: कोयले क(cid:25) कमी के प3रणाम8व Nप कोयला आधा3रत (cid:18)मता घट गई। िल‚न ाइट के भूगभ(cid:12)य आर ि(cid:18)त भंडार अनुमािनत Nप से लगभग 35.6 िबिलयन टन ह।ै िल‚न ाइट सीिमत 8थ ान* जैसे तिमलनाडु म(cid:17) नेवेली, गजु रात म(cid:17) सरू त और अकरीमोटा और राज8थ ान म(cid:17) बरJसगार, पलाना, िबथनोक म (cid:17) उपलIध ह।ै 86% स े अिधक संसाधन केवल तिमलनाडु राoय म(cid:17) ही अवि8थत ह O जब4क शेष 14% आरि(cid:18)त भंडार अCय राoय * म (cid:17) उपलIध ह।O चूं4क िल‚न ाइट अपे(cid:18)ाकृत अिधक गहराई म(cid:17) उपि8थत ह,ै जहा ं स े उसका प3रवहन आसानी से संभव नह(cid:7) ह,ै अत: िपटहडे 8ट ेशन* म(cid:17) िव#ुत उQप ादन* के िलए इसका इ8त ेमाल आकष2क हो सकता ह।ै िल‚न ाइट के खनन क(cid:25) लागत को िनयंिRत रखा जाना चािहए िजससे 4क िव#ुत का उQप ादन आPथक दिृ ~ से िमतKय यी शािमल हो सके। 6666....2222 ििििववववYYYYवव वव ससससननननीीीीययययतततताााा ममममााााननननददददडडडंंडंं '''' ककककेेेे ििििललललएएएए अअअअपपपपननननााााईईईई गगगगईईईई शशशशतततत oo oo 12व(cid:7) और 13व(cid:7) पंचवष(cid:12)य योजना के िलए उQप ादन आयोजना तैयार करने के िलए ईजीईएएस सॉ|टवेयर का <योग 4कया गया ह।ै िव#तु <णाली क(cid:25) आयोजना इस ढंग से तैयार क(cid:25) गई ह ै ता4क यह संभािवत मांग को पूरा कर सके और िव)व सनीयता का अपेि(cid:18)त 8त र सुिनिcत 4कया जा सके। िव)व सनीयता 4कसी भी <णाली क(cid:25) (cid:18)मता का एक ऐसा मापक होती ह ै जो िनधा23रत ि8थितय* म(cid:17) 4कसी भी <णाली के िनधा23रत िन!प ादन का मूjय ांकन करने म(cid:17) सहायक ह।ै हमारे अ(cid:2)य यन* म(cid:17) लोड संभाKय ता क(cid:25) हािन (एलओएलपी) एक ऐसा मानदडं ह ै िजसे पीक लोड को पूरा करने म(cid:17) <णाली क(cid:25) (cid:18)मता को <दPशत करन े के िलए अपनाया जाता ह ै और एनज(cid:12) नॉट सKड 2 (ईएनएस) ऐसा मानक ह ै िजसे <णाली म(cid:17) ऊजा2 आव)य कता को पूरा न करने क(cid:25) ि8थित दशा2ने के िलए अपनाया जाता ह।ै एलओएलपी ऐसी संभाKय ता ह ै जो कोई <णाली िविनyद!ट <चालन ि8थितय* के अतं ग2त अपन े पीक लोड ल%य को <ा=त करने म(cid:17) िवफल हो जाती ह।ै यह <ित वष2 4दन* अथवा <ित वष2 उन काय2 घंट* के अनुपात के Nप म(cid:17) होती ह ै जब उपलIध उQप ादन (cid:18)मता पीक मांग को पूरा करने क(cid:25) दिृ ~ से अपया2=त होती ह।ै यह सूचकांक 4दशाहीन ह ै और इसे <ितशत के Nप म(cid:17) भी Kय dत 4कया जा सकता ह।ै140 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ईएनएस अपेि(cid:18)त ऊजा2 क(cid:25) वह माRा ह ै जो कुल ऊजा2 आव)य कता के एक भाग के Nप म(cid:17) उपभोdत ाE को आपूPत के िलए <णाली अ(cid:18)म हो जाती ह।ै यह सूचकांक पुन: 4दशाहीन ह ै और इसे <ितशत के Nप म(cid:17) Kय dत 4कया जा सकता ह।ै दसू रे शIद * म(cid:17) यह कहा जा सकता ह ै 4क 4कसी वष2 म(cid:17) ऊजा2 आव)य कता क(cid:25) 4कतनी यूिनट को पूरा नह(cid:7) 4कया जा सका और संगत Nप से 4कसी वष2 म (cid:17) 4कतने घंटे िव#ुत क(cid:25) मांग को पूरा नह(cid:7) 4कया गया। िव)व के कई दशे * ने अपनी िव#ुत <णािलय* क(cid:25) ि8थित और <णाली क(cid:25) िव)व सनीयता के िलए उपभोdत ाE क(cid:25) भुगतान (cid:18)मता के आधार पर अपने-अपने िव)व सनीयता मानदडं अपनाए ह।O यह 8प !ट ह ै 4क कोई भी अिधक कठोर और िव)व सनीय <णाली के ज3रए िव#ुत उQप ादन और आपPू त क(cid:25) लागत अिधक होगी, िजसका भुगतान उपभोdत ा को ही करना ह।ै कुछ दशे * म(cid:17) एलओएलपी के िववरण िनbन ानुसार ह O : ददददशशेेशशेे ककककाााा ननननाााामममम एएएएललललओओओओएएएएललललपपपपीीीी((((%%%%)))) कंबोिडया 1.8 लाओस 0.27 थाइलOड 0.27 िवयतनाम 0.27 हांगकांग 0.006 बांगलादशे 1.0 बेिjजयम 0.2 यूएसए 0.03 चीन 0.14 qोत: यह सूचना उपयु2dत दशे * क(cid:25) वेबसाइट से एकR क(cid:25) गई ह।ै अब तक भारत म(cid:17) अपनाए गए िव)व सनीयता आंकड़ े एलओएलपी-1% और ईएनएस-0.15% ह।O ऐसी ि8थित तब बनी जब भारत के सम(cid:18) िव#ुत क(cid:25) भारी कमी उQप Cन हो गई। अब ऐसी उbम ीद ह ै 4क िव#तु क(cid:25) कमी दरू हो जाएगी। अत: 12व(cid:7) पंचवष(cid:12)य योजना से आगे अिधक कठोर एवं िव)व सनीय शत s अपनायी जाएगं ी। यूएसए 0.03% एलओएलपी अपनाता ह ै जो िवकिसत अथ2Kय व8थ ा के िलए उिचत <तीत होती ह।ै कुछ दि(cid:18)ण एिशयाई दशे * aारा अपनाए जान े वाले मानक एलओएलपी 0.27% ह।ै अअअअतततत:::: ययययहहहह (cid:1)(cid:1)(cid:1)(cid:1)(cid:2)(cid:2)(cid:2)(cid:2)तत तत ाााावववव 3333ककककययययाााा गगगगययययाााा हहहह ैै ैै 3333कककक 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) पपपपचचंंचचंं ववववषषषष(cid:12)(cid:12)(cid:12)(cid:12)यययय ययययोोोोजजजजननननाााा सससस ेेेे आआआआगगगग ेे ेे आआआआययययोोोोजजजजननननाााा ककककेेेे उउउउggggेYेYेYेYयय यय सससस ेेेे 0000....2222%%%% एएएएललललओओओओएएएएललललपपपपीीीी औऔऔऔरररर 0000....00005555%%%% ईईईईएएएएननननएएएएसससस ममममााााननननकककक अअअअपपपपननननााााएएएए जजजजााााएएएएगगंंगगंं ।।ेे।।ेे 6666....3333 आआआआययययोोोोजजजजननननाााा ससससबबंंबबंं धधंंधधंं ीीीी शशशशतततत oooo(ससससीीीीईईईईआआआआररररससससीीीी कककक1111 शशशशतततत)oooo िविभCन <कार क(cid:25) उQप ादन यूिनट* क(cid:25) उपलIध ता और िव#ुत उQप ादन (cid:18)मताE का मूjय ांकन करने के िलए आयोजना अ(cid:2)य यन* म(cid:17) प3रशु(cid:23) िन!प ादन मानदडं आव)य क होते ह।O दशे और िविभCन (cid:18)ेR* क(cid:25) अनुमािनत मांग को पूरा करने के िलए पीGकग पावर उपलIध ता और ऊजा2 उQप ादन (cid:18)मता महQव पूण2 मानदडं होते ह।O पीक जNरत के समय िव#ुत क(cid:25) उपलIध ता और =ल ांड लोड फैdट र ऐसे महQव पूण2 िन!प ादन घटक ह O जो आयोजना अ(cid:2)य यन* के िलए आव)य क ह O और आयोजना अ(cid:2)य यन* के िलए <युdत अC य िवशेषताE म(cid:17) अनुषंगी िव#तु खपत, उ!म ा दर, उQप ादन यूिनट* क(cid:25) पूंजीगत लागत आ4द शािमल होती ह।O िविभCन <कार क(cid:25) उQप ादन यूिनट* का <चालनगत िन!प ादन अलग-अलग होता ह ै और तदनुसार थम2ल (कोयला), सयं ुdत चB, जल िव#तु और¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 141 Cय ूिdलयर प3रयोजनाE के िलए अलग-अलग शतs िनधा23रत क(cid:25) जाती ह O और उनका <योग 4कया जाता ह।ै िविभCन आकार वाली थमल2 यूिनट* के िलए अलग-अलग उQप ादन आयोजना शतs अपनायी जाती ह O और बड़ े आकार अथा2त् 200 मेगावाट और उससे अिधक आकार वाली उQप ादन प3रयोजनाE ने िपछले कई वषU से लगातार बेहतर िन!प ादन <दPशत 4कया ह।ै 660 मेगावाट और उससे अिधक आकार वाली बड़ी यूिनट(cid:17), जो भिव!य म(cid:17) 8थ ािपत क(cid:25) जान े वाली ह,O क(cid:25) 8थ ापना अनुषगं ी िव#ुत खपत के िलए 500 मेगावाट वाली यूिनट* के साथ क(cid:25) गई ह,ै तथािप उ!म ा दर के उ()े य स े इन यूिनट* को एक अलग समूह म(cid:17) रखा गया ह।ै संयुdत चB गैस टरबाइन (सीसीजीटी) ब,त ही द(cid:18) यूिनट(cid:17) ह O और इनक(cid:25) उ!म ा दर काफ(cid:25) कम होती ह,ै हालां4क इनक(cid:25) उपलIध ता और पीएलएफ गैस क(cid:25) उपलIध ता पर िनभ2र करेगा। जल िव#ुत यूिनट* क(cid:25) ऊजा2 प3रयोजना क(cid:25) िडजाइन ऊजा 2 के आधार पर ली गई ह।ै 6666....3333....1111 पपपपीीीीnnnnककककगगगग उउउउपपपपलललल;;;;धध धध तततताााा िविभCन <कार क(cid:25) उQप ादन यूिनट* क(cid:25) पीGकग उपलIध ता (सकल) नीच े ततततााााििििललललककककाााा 6666....1111 म(cid:17) दी गई ह ै : ततततााााििििललललककककाााा 6666....1111 आंकड़ े % म(cid:17) थथथथममममलल(cid:22)(cid:22)लल(cid:22)(cid:22) ////>>>>यय यय ििूूििूू 0000ललललययययरररर////हहहहााााइइइइ<<<<ोोोो पपपपााााववववरररर (cid:2)(cid:2)(cid:2)(cid:2)टट टट ेेशशेेशशनननन'''' कककक1111 पपपपीीीीnnnnककककगगगग उउउउपपपपलललल;;;;धध धध तततताााा ((((ससससककककलललल)))) ययययििूूििूू ननननटटटट आआआआककककाााारररर ममममौौौौजजजजददूूददूू ाााा ययययििूूििूू ननननटटटट$$ $$ भभभभााााववववीीीी ययययििूूििूू ननननटटटट$$ $$ थथथथममममलल(cid:22)(cid:22)लल(cid:22)(cid:22) ((((ककककोोोोययययललललाााा)))) 888800000000////666666660000 मेगावाट - 88888888 555500000000////222255550000////222211110000////222200000000 मेगावाट 85 88885555 222200000000 मेगावाट से कम 75 88885555 222200000000 मेगावाट से कम, वत2मान म(cid:17) 22220000 %%%% 50 ---- पीएलएफ से कम पर <चालनरत गगगगससैैससैै आआआआधधधधाााा////ररररतततत ओसीजीटी संपूण2 आकार 90 99990000 सीसीसजीटी संपूण2 आकार 88 88888888 डडडडीीीीजजजजीीीी ससससटटेेटटेे संपूण2 आकार 75 77775555 ििििललललHHHHनन नन ााााइइइइटटटट आआआआधधधधाााा////ररररतततत संपूण2 आकार 80 88880000 >>>>यय य य ििूूििूू 0000ललललययययरररर संपूण2 आकार 68 66668888 हहहहााााइइइइ<<<<ोोोो ससससपपंंपपंं ूूणणूूणण (cid:22)(cid:22) (cid:22)(cid:22)आआआआककककाााारररर 88887777....5555 88887777....5555 6666....3333....2222 अअअअननननषषुुषषुु गगंंगगंं ीीीी ििििववववIIIIततुुततुु खखखखपपपपतततत:::: शशशशााााििििममममलललल कककक1111 गगगगईईईई ििििववववििििभभभभ>>>>नन नन (cid:1)(cid:1)(cid:1)(cid:1)ककककाााारररर कककक1111 उउउउNNNNपप पप ााााददददनननन ययययििूूििूू ननननटटटट'''' कककक1111 अअअअननननषषुुषषुु गगंंगगंं ीीीी खखखखपपपपतततत ततततााााििििललललककककाााा 6666....2222 मममम $$ $$ददददीीीी गगगगईईईई हहहह।।ैै।।ैै¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 142 ततततााााििििललललककककाााा 6666....2222 IIII ककककोोोोययययललललाााा आआआआधधधधाााा////ररररतततत पपपपााााववववरररर (cid:2)(cid:2)(cid:2)(cid:2)टट टट ेेशशेेशशनननन अअअअननननषषुुषषुु गगंंगगंं ीीीी ििििववववIIIIततुुततुु खखखखपपपपतततत 1111.... 888800000000//// 666666660000 ममममगगेेगगेे ााााववववााााटटटट ffffणणेेणणेे ीीीी ववववााााललललीीीी ययययििूूििूू ननननटटटट$$ $$ 7777....5555%%%% 2222.... 555500000000 ममममेगेगेगेगााााववववााााटटटट ffffणणेेणणेे ीीीी ववववााााललललीीीी ययययििूूििूू ननननटटटट$$ $$ 7777....5555%%%% 3333.... 222255550000////222211110000////222200000000 ममममगगेेगगेे ााााववववााााटटटट ffffणणेेणणेे ीीीी ववववााााललललीीीी ययययििूूििूू ननननटटटट$$ $$ 8888....5555%%%% 4444.... 222200000000 ममममेगेगेगेगााााववववााााटटटट सससस ेे ेेननननीीीीचचचच ेेेेववववााााललललीीीी ययययििूूििूू ननननटटटट$$ $$ 11112222....0000%%%% ििििललललHHHHनन नन ााााइइइइटटटट आआआआधधधधाााा////ररररतततत ययययििूूििूू ननननटटटट$$ $$ 11112222 %%%% <<<<222200000000 ममममेगेगेगेगााााववववााााटटटट ककककेेेे ििििललललएएएए 9999 %%%% >>>>222200000000 ममममगगेेगगेे ााााववववााााटटटट ककककेेेे ििििललललएएएए IIIIIIII गगगगससैैससैै आआआआधधधधाााा////ररररतततत पपपपााााववववरररर (cid:2)(cid:2)(cid:2)(cid:2)टट टट ेेशशेेशशनननन 1111 ससससययंंययंं 00ुु00ुु तत तत चचचच```` 3333....0000%%%% 2222 ममममु0ु0ु0ु0तत तत चचचच```` 1111....0000%%%% 3333 डडडडीीीीजजजजीीीी ससससटटेेटटेे ////गगगगससैैससैै SSSSजजजजनननन 1111....0000%%%% IIIIIIIIIIII हहहहााााइइइइ<<<<ोोोो पपपपााााववववरररर (cid:2)(cid:2)(cid:2)(cid:2)टट टट ेेशशेेशशनननन 0000....7777%%%% IIIIVVVV >>>>यय य य ििूूििूू 0000ललललययययरररर पपपपााााववववरररर (cid:2)(cid:2)(cid:2)(cid:2)टट टट ेेेेशशशशनननन 111166660000 ममममेगेगेगेगााााववववााााटटटट बबबबीीीीडडडड;;;;++ ++ यय यय आआूूआआूू रररर 11110000%%%% 222200000000////222222220000 ममममगगेेगगेे ााााववववााााटटटट पपपपीीीीएएएएचचचचडडडड;;;;++ ++ यय यय आआूूआआूू रररर 11112222....5555%%%% 1111000000000000 ममममगगेेगगेे ााााववववााााटटटट एएएएललललडडडड;;;;++ ++ यय यय आआूूआआूू रररर 222222220000//// 555544440000 ममममगगेेगगेे ााााववववााााटटटट पपपपीीीीएएएएचचचचडडडड;;;;++ ++ यय यय आआूूआआूू रररर 7777....8888%%%% 555500000000 ममममेगेगेगेगााााववववााााटटटट एएएएफफफफबबबबीीीीआआआआरररर 11112222....5555%%%% 6666....0000%%%% 6666....3333....3333 ममममशशशशीीीीनननन उउउउUUUUमम मम ाााा ददददरररर:::: िविभCन थम2ल यूिनट* के िलए शािमल क(cid:25) गई मशीन उ!म ा दर(cid:17) (सकल) नीचे ततततााााििििललललककककाााा 6666....3333 म(cid:17) दी गई ह:O¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 143 ततततााााििििललललककककाााा 6666....3333 ययययििूूििूू ननननटटटट आआआआककककाााारररर ससससककककलललल ऊऊऊऊUUUUमम मम ाााा ददददरररर ((((ककककेेेेससससीीीीएएएएएएएएलललल////ककककेेेेडडडड;;;;++ ++ यय यय एएूूएएूू चचचच)))) 888800000000 ममममेगेगेगेगााााववववााााटटटट 2222333300000000 666666660000 ममममेगेगेगेगााााववववााााटटटट 2222333300000000 555500000000 ममममेगेगेगेगााााववववााााटटटट 2222444422225555 222200000000////222211110000////222255550000 ममममगगेेगगेे ााााववववााााटटटट ककककेेेेडडडड;;;;++ ++ यय यय ययूूययूू ूू ूू 2222444466660000 222200000000////222211110000////222255550000 ममममगगेेगगेे ााााववववााााटटटट एएएएललललएएएएममममजजजजेडेडेडेड 2222555500000000 222255550000////222211110000////111122225555 ममममगगेेगगेे ााााववववााााटटटट ((((ििििललललHHHHनन नन ााााइइइइटटटट)))) 2222777755550000 111100000000 ममममेगेगेगेगााााववववााााटटटट 2222777755550000 55550000 ममममेगेगेगेगााााववववााााटटटट ffffेणेणेणेणीीीी ववववााााललललीीीी ययययििूूििूू ननननटटटट$$ $$ 3333000000000000 33330000 ममममेगेगेगेगााााववववााााटटटट ffffेणेणेणेणीीीी ववववााााललललीीीी ययययििूूििूू ननननटटटट$$ $$ 3333333300000000 ससससययंंययंं 00ुु00ुु तत तत चचचच```` गगगगससैैससैै टटटटररररबबबबााााइइइइनननन 2222000000000000 ममममु0ु0ु0ु0तत तत चचचच```` गगगगससैैससैै टटटटररररबबबबााााईईईईनननन////डडडडीीीीजजजजीीीी ससससटटेेटटेे 2222999900000000 ममममु0ु0ु0ु0तत तत चचचच```` गगगगससैैससैै इइइइंंंंजजजजनननन 2222222200000000 ससससययंंययंं 00ुु00ुु तत तत चचचच```` गगगगससैैससैै इइइइंंंंजजजजनननन 2222000000000000 6666....3333....4444 गगगगससैैससैै ////एएएएललललएएएएननननजजजजीीीी कककक1111 ललललाााागगगगतततत औऔऔऔरररर ऊऊऊऊUUUUमम मम ाााा ममममू+ू+ू+ू+यय यय ततततााााििििललललककककाााा 6666....4444 ललललाााागगगगतततत ककककैैैैललललोोोोररररीीीी मममम++ूू++ूू यय यय SSSSधधधधनननन ((((MMMM....////टटटटीीीीएएएएचचचच....ससससीीीीययययएएूूएएूू मममम)))) ((((ककककेेेेससससीीीीएएएएएएएएलललल ////ससससीीीीययययएएूूएएूू मममम)))) एएएएललललएएएएननननजजजजीीीी 8888,,,,000000000000 9999,,,,888800000000 गगगगससैैससैै ((((एएएएचचचचववववीीीीजजजज))ेे))ेे 4444,,,,444400000000 9999,,,,555500000000 गगगगससैैससैै ((((////ररररललललााााययययससंंससंं )))) 5555,,,,777766660000 9999,,,,555500000000 गगगगससैैससैै ((((एएएएननननईईईईआआआआरररर)))) 3333,,,,000000000000 9999,,,,555500000000144 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 6666....3333....5555 ििििववववNNNNतत तत ीीीीयययय ममममााााननननददददडडडडंंंं ततततााााििििललललककककाााा 6666....5555 ````ममममााााककंंककंं ममममदददद ययययििूूििूू ननननटटटट मममम++ूू++ूू यय यय 1111 डडडडीीीीईईईईबबबबीीीीटटटटीीीी ----पपपपूंूंजजूंूंजजीीीीगगगगतततत ललललाााागगगगतततत ककककाााा %%%% %%%% 77770000 2222 इइइइ3333ppppटटटटीीीी ---- पपपपूंजूंजूंजूंजीीीीगगगगतततत ललललाााागगगगतततत ककककाााा %%%% %%%% 33330000 3333 ककककााााययययशश(cid:22)(cid:22)शश(cid:22)(cid:22) ीीीीलललल पपपपजजूंूंजजूंूं ीीीी ---- पपपपूंजूंजूंजूंजीीीीगगगगतततत ललललाााागगगगतततत ककककाााा %%%% %%%% 6666 4444 ऋऋऋऋणणणण पपपपरररर ;;;;यय यय ााााजजजज %%%% 11111111....5555 5555 इइइइ3333ppppटटटटीीीी पपपपरररर ललललााााभभभभ %%%% 11115555....5555++++ककककरररर 6666 ककककााााययययशश(cid:22)(cid:22)शश(cid:22)(cid:22) ीीीीलललल पपपपजजूंूंजजूंूं ीीीी पपपपरररर ;;;;यय यय ााााजजजज %%%% 11112222....22225555 7777 छछछछूूूूटटटट ददददरररर %%%% 9999....0000 8888 पपपपााााववववरररर 7777लल लल ााााटटंंटटंं ककककाााा (cid:1)(cid:1)(cid:1)(cid:1)चचचचााााललललनननन औऔऔऔरररर ररररखखखख----ररररखखखखाााावववव (cid:1)(cid:1)(cid:1)(cid:1)भभभभाााारररर %%%% 2222....5555 9999 पपपपााााररररेेेेषषषषणणणण ललललााााईईईईनननन ककककाााा (cid:1)(cid:1)(cid:1)(cid:1)चचचचााााललललनननन औऔऔऔरररर ररररखखखख----ररररखखखखाााावववव (cid:1)(cid:1)(cid:1)(cid:1)भभभभाााारररर %%%% 1111....5555 11110000 मममम++ूू++ूू यय यय rrrrाााासससस---- पपपपााााववववरररर 7777लल लल ााााटटंंटटंं %%%% 5555....22228888 11112222 ववववषषषष (cid:22)(cid:22) (cid:22)(cid:22)ककककेेेे ििििललललएएएए 6666....3333....6666 7777लल लल ााााटटंंटटंं ललललोोोोडडडड फफफफैैैै0000टट टट रररर :::: िविभCन <कार के =ल ांट* के िलए शािमल 4कए गए थम2ल पावर 8ट ेशन* (कोयला और गैस आधा3रत) का =ल ांट लोड फैdट र नीचे ततततााााििििललललककककाााा 6666....6666 म(cid:17) 4दया गया ह:ै तािलका 6666....6666 थथथथममममलल(cid:22)(cid:22)लल(cid:22)(cid:22) //// >>>>यय यय ििूूििूू 0000ललललययययरररर पपपपााााववववरररर (cid:2)(cid:2)(cid:2)(cid:2)टट टट ेेेेशशशशनननन ककककाााा पपपपललललााााटटंंटटंं ललललोोोोडडडड फफफफैैैै0000टट ट ट रररर ययययििूूििूू ननननटटटट पपपपीीीीएएएएललललएएएएफफफफ अअअअssssयय यय ििुुििुु RRRR ((((%%%%)))) थम2ल कोयला आधा3रत 800/660 मेगावाट 85.0 भावी यूिनट(cid:17) 500/250/210/200 मेगावाट 85.0 मौजूदा और भावी यूिनट(cid:17) Below 100/110 मेगावाट 60 भावी यूिनट* के िलए 80% 40 पूव(cid:12) (cid:18)ेR और पूव„QQ र (cid:18)ेR म (cid:17) 20% पीएलएफ से नीचे <चालनरत यूिनट(cid:17)। िल‚न ाइट आधा3रत 125/ 200/250 मेगावाट 75 गैस आधा3रत सीसीजीटी/सीसीजीई 68.5 ओसीजीटी/ओसीजीई 33 Cय िू dलयर यूिनट ससससपपंंपपंं ूणूणूणूण (cid:22)(cid:22) (cid:22)(cid:22)आआआआककककाााारररर 68 सकाराQम क (cid:18)मता घटक¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 145 हाइrो यूिनट* के िलए ऊजा 2 उQप ादन 4कसी 90% िव)व सनीय वष2 म(cid:17) िनधा23रत ऊजा 2 उQप ादन के अनुसार ह।ै 6666....4444 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) पपपपचचंंचचंं ववववषषषष(cid:12)(cid:12)(cid:12)(cid:12)यययय ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन उउउउNNNNपप पप ााााददददनननन (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा ििििवववव(cid:2)(cid:2)(cid:2)(cid:2)तत तत ाााारररर आआआआययययोोोोजजजजननननाााा रा!" ीय लोड अंतराल कव2 के आधार पर उपयु2dत मांग अनुमान* को पूरा करने के िलए आव)य क 8थ ािपत (cid:18)मता का मूjय ांकन करने के िलए केCf ीय िव#ुत <ािधकरण aारा िव#ुत उQप ादन िव8त ार िव)ल ेषण <णाली (ईजीईएएस) पर एक कं=य ूटर मॉडल अ(cid:2)य यन काय2Bम संचािलत 4कया गया। यह अ(cid:2)य यन िनbन िलिखत त(cid:129)य * पर आधा3रत ह ै : • 18व(cid:7) ईपीएस 3रपोट2 म(cid:17) बतायी गई अनुमािनत मांग अथा2त् पीक मांग - 1111,,,,99999999,,,,555544440000 मेगावाट और बस बार म(cid:17) ऊजा2 आव)य कता - 1111333355554444 िबिलयन यूिनट के अनसु ार • 10,000 मेगावाट का ि8पJनग 3रजव2 (रा!" ीय िव#ुत नीित म(cid:17) 4कय े गए िवलेख के अनुसार 5% ि8पJनग 3रजव2 के समान)।यह <ित वेदन 4दया गया ह ै 4क ि8पJनग 3रजव2 का यह आंकड़ा अिधक ह ै और इसक(cid:25) समी(cid:18)ा क(cid:25) जानी चािहए, यह 2-3% हो सकता ह।ै चूं4क भारत िनवेश के संदभ2 म (cid:17) 5% ि8पJनग 3रजव2 वहन नह(cid:7) कर सकता ह,ै अत: केCf ीय िव#तु <ािधकरण के चेयरपसन2 क(cid:25) अ(cid:2)य (cid:18)ता म(cid:17) ग3ठत 4कए गए पीGकग =ल ांट और ि8पJनग 3रजव2 पर काय2बल इस मु( े पर आव)य क जानकारी दग(cid:17) े। • िव)व सनीयता मानदडं –––– लोड संभाKय ता क(cid:25) हािन (एलओएलपी) <<<<0000....2222%%%% और एनज(cid:12) नॉट सKड 2 (ईएनएस) <<<< 0000....00005555%%%%। • 11व(cid:7) पंचवष(cid:12)य योजना के दौरान िनधा23रत वा8त िवक (cid:18)मता अिभवृि(cid:23)- 55554444,,,,999966664444 मेगावाट • 12व(cid:7) पंचवष(cid:12)य योजना के दौरान समा=त (cid:18)मता लगभग 4000 मेगावाट ह,ै िजसम(cid:17) 100 मेगावाट (11व(cid:7) पंचवष(cid:12)य योजना के दौरान पहले से समा=त 1500 मेगावाट) से कम कोयला और िल‚न ाइट आधा3रत शेष यूिनट(cid:17), 30 वष2 से अिधक पुराने (अथा2त् 1987 या उससे पहले) गैस आधा3रत =ल ांट और 110 मेगावाट वाली कुछ कोयला आधा3रत यूिनट(cid:17) शािमल ह।O • 1111,,,,222200000000 मेगावाट जलिव#ुत का पड़ोसी दशे * से आयात • काब2न डाई ऑdस ाइड ((((CO2)))) के उQस जन2 को कम करन े के उ()े य से <थम <ाथिमकता सभं ािवत जल िव#ुत प3रयोजनाE, 4फर Cय ूिdलयर और 4फर गैस आधा3रत प3रयोजनाE को दी जा रही ह।ै • यह सुिनिcत करने के उ()े य से 4क सभी मौसम* म(cid:17) मागं पूरी क(cid:25) जा रही ह,ै मौसम आधा3रत अ(cid:2)य यन करने के बजाय वाPषक अ(cid:2)य यन 4कया जा रहा ह।ै • अ(cid:2)य यन म(cid:17) शािमल क(cid:25) गई प3रयोजनाए ं िनbन ानसु ार ह O : (cid:3) हहहहााााइइइइ<<<<ोोोो हमारी कम काब2न उQस ज2न रणनीित के अनुसार ईजीएएस अ(cid:2)य यन म(cid:17) जलिव#ुत प3रयोजनाE पर अिनवाय2 Nप से सचं ािलत क(cid:25) जाने वाली प3रयोजनाE के Nप म(cid:17) िवचार 4कया गया ह।ै िविभCन िनमा2णाधीन प3रयोजनाE क(cid:25) iquLFkkiuk ि8थित और भूगभ(cid:12)य अिनिcतताE, <ाकृितक आपदाE जैसे बाढ़, और पुनवा2स तथा पया2वरणीय पहलुE को (cid:2)य ान म(cid:17) रखते ,ए ऐसा अनुमान ह ै 4क जलिव#ुत प3रयोजनाE के 4BयाCव यन म(cid:17) ऐसी सम8य ाए ं आ सकती ह।O इस बात को आलोक म(cid:17) यह <8त ाव 4कया जाता ह ै 4क 12व(cid:7) पंचवष(cid:12)य योजना के दौरान लगभग 10,897 मेगावाट जलिव#तु (cid:18)मता अिभवृि(cid:23) क(cid:25) जा सकती ह।ै जलिव#ुत प3रयोजनाE के िववरण अअअअननननबबुुबबुु धधंंधधंं 6666....1111 म(cid:17) 4दए गए ह।O 12व(cid:7) और 13व(cid:7) पंचवष(cid:12)य योजना के दौरान पूरी क(cid:25) जा सकने वाली जलिव#तु प3रयोजनाE िजनक(cid:25) कुल 8थ ािपत (cid:18)मता 2,435 मेगावाट ह,ै क(cid:25) अित3रdत सूची अअअअननननबबुुबबुु धधंंधधंं 6666....2222 म(cid:17) दी गई ह।ै इसके अलावा 19,675 मेगावाट (cid:18)मता वाली जलिव#तु प3रयोजनाE क(cid:25) अित3रdत सूची तैयार क(cid:25) गई है, ि जनका लाभ 13व(cid:7) पंचवष(cid:12)य योजना के दौरान िमलन े क(cid:25) संभावना ह।ै संबंिधत िववरण अअअअननननबबुुबबुु धधंंधधंं 6666....8888 म(cid:17) 4दए गए ह।O146 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] (cid:3) >>>>यय य य ििूूििूू 0000ललललययययरररर Cय ूिdलयर पावर कॉप„रेशन ऑफ इंिडया िलिमटेड aारा दी गई सूचना के अनसु ार 5,300 मेगावाट Cय ूिdलयर (cid:18)मता अिभवृि(cid:23) पर िवचार 4कया गया ह।ै इससे संबंिधत िववरण अअअअननननबबुुबबुु धधंंधधंं 6666....1111 म(cid:17) 4दए गए ह।O (cid:3) थथथथममममलल(cid:22)(cid:22)लल(cid:22)(cid:22) गगगगससैैससैै आआआआधधधधाााा////ररररतततत 7777लल लल ााााटटंंटटंं CO2 के उQस ज2न को कम करने के उ()े य से गैर आधा3रत (cid:18)मता अिभवृि(cid:23) को आव)य क समझा जाता ह।ै आधुिनक संयुdत चB गैस टरबाइन (सीसीजीटी) क(cid:25) उzच द(cid:18)ता कोयला आधा3रत =ल ांट* (सुपर 4B3टकल यूिनट* क(cid:25) सकल द(cid:18)ता 38-40% ह)ै क(cid:25) तुलना म(cid:17) लगभग 55% ह।ै गैस आधा3रत टरबाइन/इंजन* क(cid:25) 8थ ापना लोड स(cid:17)टर के समीप क(cid:25) जा सकती ह।ै प3रणाम8व Nप पारेषण <णाली क(cid:25) आव)य कता कम हो जाएगी और इनका <चालन इस ढंग से 4कया जा सकता ह ै िजसस े 4क पीक घटं * के दौरान आउटपुट को अिधकतम 4कया जा सके और ऑफपीक घंट* के दौरान आउटपुट Cय ूनतम 4कया जा सके और इस <कार उपलIध गैस का इ!ट तम सदपु योग संभव हो सके। 12व(cid:7) पंचवष(cid:12)य योजना के दौरान कोयल े क(cid:25) कमी बढ़ सकने क(cid:25) संभावना को (cid:2)य ान म(cid:17) रखत े ,ए हम(cid:17) 12,000 स े 15,000 मेगावाट (cid:18)मता वाली गैस आधा3रत प3रयोजनाE क(cid:25) आयोजना तैयार करनी चािहए िजससे 4क (cid:18)मता अिभवृि(cid:23) के ल%य को पूरा 4कया जा सके साथ ही CO2 के उQस ज2न को भी कम 4कया जा सके। दशे म(cid:17) िव#ुत क(cid:25) भारी कमी और गैस =ल ांट* से ब,त ही कम काब2न उQस ज2 न को (cid:2)य ान म(cid:17) रखते ,ए जह” तक घरेलू गैस आवंटन का संबंध ह ै तो यह िसफा3रश क(cid:25) जाती ह ै 4क <थम <ाथिमकता िव#ुत प3रयोजनाE को दी जाए, जो िव#तु (cid:18)ेR म (cid:17) CO2 के उQस ज2न को कम करने म(cid:17) भी सहायक ह।ै चूं4क गसै क(cid:25) उपलIध ता अिनिcत है, इसिलए 12व(cid:7) योजना के दौरान उzच गैस प3रद)ृ य म(cid:17) केवल 14,540 मेगावाट (cid:18)मता वाली गैस आधा3रत प3रयोजनाE पर ही िवचार 4कया गया ह ै और िनbन गैस प3रद)ृ य म(cid:17) 8थ ानीय qोत* स े िजन प3रयोजनाE के िलए गैस उपलIध ह,ै उनस े 2,540 मेगावाट (cid:18)मता अिभवृि(cid:23) के िलए िवचार 4कया गया ह।ै 12व(cid:7) पंचवष(cid:12)य योजना म(cid:17) शािमल क(cid:25) गई 2,540 मेगावाट क(cid:25) कुल (cid:18)मता वाली गैस आधा3रत प3रयोजनाE के प3रयोजनावार िववरण अअअअननननबबुुबबुु धधंंधधंं 6666....1111 म (cid:17) 4दए गए ह।O इसके अलावा लगभग 13000 मेगावाट (cid:18)मता वाली कई अCय प3रयोजनाए ं भी िनमा2णाधीन ह O और अगर इन प3रयोजनाE के िलए गैस उपलIध हो जाती ह ै तो 12व(cid:7) पंचवष(cid:12)य येाजना के दौरान इनक(cid:25) 8थ ापना क(cid:25) जा सकती ह।ै इन प3रयोजनाE के िववरण अअअअननननबबुुबबुु धधंंधधंं 6666....6666 म(cid:17) 4दए गए ह।O ककककोोोोययययललललाााा आआआआधधधधाााा////ररररतततत 7777लल लल ााााटटंंटटंं िविनyद!ट मांग को पूरा करने के िलए शेष (cid:18)मता अिभवृि(cid:23) कोयला आधा3रत प3रयोजनाE से करने का <8त ाव ह।ै इस <कार 12व(cid:7) पंचवष(cid:12)य योजना के दौरान भी (cid:18)मता अिभवृि(cid:23) के िलए <मुख nधन कोयला ही रहने क(cid:25) उbम ीद ह।ै ऐसी प3रयोजनाE क(cid:25) सूची तैयार क(cid:25) गई ह ै िजनका लाभ 12व(cid:7) पंचवष(cid:12)य येाजना म(cid:17) <ा=त होने क(cid:25) संभावना ह।ै कोयला/िल‚न ाइट आधा3रत 69,800 मेगावाट कुल (cid:18)मता वाली िनमा2णाधीन और 12व(cid:7) योजना के दौरान पूरी क(cid:25) जा सकने वाली प3रयोजनाE के प3रयोजनवार िववरण अअअअननननबबुुबबुु धधंंधधंं 6666....1111 म(cid:17) 4दए गए ह।O 33,870 मेगावाट क(cid:25) कुल (cid:18)मता वाली अCय थम2ल प3रयोजनाए ं जो वत2मान म(cid:17) िनमा2णाधीन ह O और 12व(cid:7) पंचवष(cid:12)य योजना के दौरान िजनका लाभ <ा=त हो सकता ह,ै के िववरण अअअअननननबबुुबबुु धधंंधधंं 6666....2222 म(cid:17) 4दए गए ह।O 14,460 मेगावाट क(cid:25) कुल (cid:18)मता वाली ऐसी िव#तु प3रयोजनाए ं िजनके िलए सामूिहक िनिवदा जारी क(cid:25) गई है, क(cid:25) सचू ी अअअअननननबबुुबबुु धधंंधधंं 6666....3333 म(cid:17) दी गई ह।ै 13,050 मेगावाट कुल (cid:18)मता वाली कुछ िव#ुत प3रयोजनाE िजनके िलए मुZय =ल ांट* हते ु आदशे जारी कर 4दए गए ह,O परंतु कुछ 8व ीकृितयां <ा=त नह(cid:7) ,ई ह,O के प3रयोजनावार िववरण अअअअननननबबुुबबुु धधंंधधंं 6666....4444 म(cid:17) 4दए गए¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 147 ह।O 11,200 मेगावाट क(cid:25) कुल (cid:18)मता वाली प3रयोजनाए ं िजनके िलए कोयला संबंधी करार कर िलए गए ह,O परंत ु उनके मुZय =ल ांट के िलए आदशे <8त ुत नह(cid:7) 4कए गए हO, के िववरण अअअअननननबबुुबबुु धधंंधधंं 6666....5555 म(cid:17) 4दए गए ह।O इसके अलावा कुछ प3रयोजनाE के िवकासकता2E ने अपनी प3रयोजनाE को 12व(cid:7) पंचवष(cid:12)य योजना सूची म(cid:17) शािमल करने का अनुरोध 4कया ह।ै 13,111 मेगावाट कुल (cid:18)मता वाली ये प3रयोजनाए ं आरंि भक चरण पर ह O और 12व(cid:7) पंचवष(cid:12)य योजना म(cid:17) इनक(cid:25) 8थ ापना क(cid:25) जा सकती ह।ै इन प3रयोजनाE के िववरण अअअअननननबबुुबबुु धधंंधधंं 6666....7777 म(cid:17) 4दए गए ह O । 6666....5555 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) पपपपचचंंचचंं ववववषषषष(cid:12)(cid:12)(cid:12)(cid:12)यययय ययययोोोोजजजजननननाााा अअअअ((((यय यय ययययनननन औऔऔऔरररर पपपप////ररररणणणणाााामममम िव)व सनीयता मानदडं * के अनुNप मांग को पूरा करन े के िलए 12व(cid:7) पंचवष(cid:12)य योजना के दौरान कुल (cid:18)मता अिभवृि(cid:23) का मूjय ांकन करन े के उ()े य से ईजीइ2एएस अ(cid:2)य यन 4कया गया। पूव2 म(cid:17) 4कए गए अ(cid:2)य यन केवल वाPषक मांग अनुमान* को पूरा करने के िलए आव)य क (cid:18)मता अिभवृि(cid:23) का अनुमान लगाने के िलए 4कए गए। हालां4क इस बात पर िवचार 4कया गया 4क वाPषक अ(cid:2)य यन पया2=त नह(cid:7) ह O dय *4क उनम(cid:17) इस बात क(cid:25) संभावना समा=त नह(cid:7) होगी 4क 4कसी वष2 के सभी माह* के 5 मौसम Iल ॉक* म(cid:17) स े <Qय ेक मौसम के दौरान िव)व सनीयता मानदडं को पूरा करन े के िलए <णाली हते ु यह (cid:18)मता पया2=त होगी अथवा नह(cid:7)। माह* के पांच Iल ॉक अ<ैल से जून, जुलाई से िसतंबर, अdट ूबर-नबंबर, 4दसबं र-जनवरी और फरवरी-माच2 ह।O अत: मौसम आधा3रत अ(cid:2)य यन यह सुिनिcत करने के िलए आव)य क समझे गए 4क <णाली क(cid:25) मौसम आधा3रत मांग <Qय ेक Iल ॉक म(cid:17) इस बात के म(ने जर पूरी क(cid:25) जाएगी जब माह के उपयु2dत Iल ॉक* म (cid:17) स े <Qयेक Iल ॉक के दौरान जलिव#ुत =ल ांट* क(cid:25) ऊजा2 को भी (cid:2)य ान म(cid:17) रखा जाएगा। अत: पांच* <Qय ेक मौसम अथा2त् वष2 के पांच माह Iल ॉक* के िलए अ(cid:2)य यन 4कए गए, इनम(cid:17) (cid:18)मता अिभवृि(cid:23) आव)य कता का मूjय ांकन करन े के िलए ईजीईएएस मॉडल का <योग 4कया गया। हाइrो, गैस और Cय ूिdलयर आधा3रत (cid:18)मता को उzच <ाथिमकता दी जाती है, dय *4क इनम(cid:17) कम काबन2 उQस जन2 रणनीित क(cid:25) दिृ ~ स े लाभ अतं Pनिहत ह।O अत: 12व(cid:7) योजना के दौरान संभािवत इन qोत* से (cid:18)मता अिभवृि(cid:23) को िविभCन प3रद)ृ य * म(cid:17) अिनवाय2 नवीकरणीय (cid:18)मता को भी अिनवाय2 Nप स े संचािलत क(cid:25) जाने वाली (cid:18)मता के Nप म(cid:17) माना गया ह,ै हालां4क केवल इस पर ही ऊजा2 आव)य कता क(cid:25) पूPत के िलए िवचार नह(cid:7) 4कया गया ह।ै 12वी पंचवष(cid:12)य योजना के दौरान (cid:18)मता अिभवृि(cid:23) के िलए चार प3रद)ृ य िवकिसत 4कए गए जो िन•ानुसार ह O : प3रद)ृ य 1 – िन• नवीकरणीय (18,500 मेगावाट), िन• गैस (2,540 मेगावाट) (आधारभूत मामला) प3रद)ृ य 2- िन• नवीकरणीय (18,500 मेगावाट), उ– गैस (14,540 मेगावाट) प3रद)ृ य 3- उ– नवीकरणीय (30,000 मेगावाट), उ– गैस (14,540 मेगावाट) प3रद)ृ य 4- उ– नवीकरणीय (30,000 मेगावाट), िन• गैस (2,540 मेगावाट) 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) पपपपंचंचंचंचववववषषषष(cid:12)(cid:12)(cid:12)(cid:12)यययय ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन चचचचाााारररर'''' पपपप////ररररददददYYYYृृृृ यययय मममम$$ $$ 11112222,,,,000000000000 ममममेगेगेगेगााााववववााााटटटट (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा ककककेेेे हहहहााााइइइइ<<<<ोोोो आआआआययययाााातततत पपपपरररर ििििववववचचचचाााारररर 3333ककककययययाााा गगगगययययाााा हहहह।।ैै।।ैै <Qयेक मामले म(cid:17) िविभp प3रद)ृ य* और अ(cid:2)ययन प3रणाम के िववरण िनbन ानसु ार ह O :148 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] • पपपप////ररररददददYYYYृृृृ यययय ----1111---- 11118888वववव(cid:7)(cid:7)(cid:7)(cid:7) ईईईईपपपपीीीीएएएएसससस ममममाााांगंगंगंग –––– ििििननननtttt ननननववववीीीीककककररररणणणणीीीीयययय ((((11118888,,,,555500000000 ममममेगेगेगेगााााववववााााटटटट)))),,,, ििििननननtttt गगगगैसैसैसैस ((((2222,,,,555544440000 ममममगगेेगगेे ााााववववााााटटटट)))) –––– आआआआधधधधााााररररभभभभततूूततूू ममममााााममममललललाााा (cid:1)(cid:1)(cid:1)(cid:1)ककककाााारररर 11112222 वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा आआआआववववYYYYययययककककतततताााा ((((ममममेगेगेगेगााााववववााााटटटट मममम$$)))$$) हहहहााााइइइइ<<<<ोोोो 10,897 थथथथममममलल(cid:22)(cid:22)लल(cid:22)(cid:22) 70,903 कोयला 67,843 िल—ाइट 520 गैस 2,540 >>>>ययययििूूििूू 0000ललललययययरररर 5,300 ककककुुुुलललल (पपपपााााररररंंंंपपपप////ररररकककक) 88887777,,,,111100000000 पपपपववववनननन 11,000 ससससौौौौरररर 4,000 अअअअ>>>>यय यय (ननननववववीीीीककककररररणणणणीीीीयययय ऊऊऊऊजजजजाााा (cid:22)(cid:22) (cid:22)(cid:22)DDDDोोोोतततत ) 3,500 ककककुुुुलललल (ननननववववीीीीककककररररणणणणीीीीयययय ऊऊऊऊजजजजाााा (cid:22)(cid:22) (cid:22)(cid:22)DDDDोोोोतततत ) 18,500 11112222 वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन ससससममममाााापपपपनननन 4,000 • पपपप////ररररददददYYYYृृृृ यययय ----2222---- 11118888वववव(cid:7)(cid:7)(cid:7)(cid:7) ईईईईपपपपीीीीएएएएसससस ममममाााांगंगंगंग –––– ििििननननtttt ननननववववीीीीककककररररणणणणीीीीयययय ((((11118888,,,,555500000000 ममममेगेगेगेगााााववववााााटटटट)))),,,, उउउउuuuu गगगगससैैससैै ((((11114444,,,,555544440000 ममममेगेगेगेगााााववववााााटटटट)))) (cid:1)(cid:1)(cid:1)(cid:1)ककककाााारररर 11112222 वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा आआआआववववYYYYययययककककतततताााा ((((ममममगगेेगगेे ााााववववााााटटटट मममम))$$))$$ हहहहााााइइइइ<<<<ोोोो 10,897 थथथथममममलल(cid:22)(cid:22)लल(cid:22)(cid:22) 70,903 कोयला 55,843 Xuk िल इट 520 गैस 14,540 >>>>ययययििूूििूू 0000ललललययययरररर 5,300 ककककुुुुलललल (पपपपााााररररंंंंपपपप////ररररकककक) 88887777,,,,111100000000 पपपपववववनननन 11,000 ससससौौौौरररर 4,000 अअअअ>>>>यय यय (ननननववववीीीीककककररररणणणणीीीीयययय ऊऊऊऊजजजजाााा (cid:22)(cid:22) (cid:22)(cid:22)DDDDोोोोतततत ) 3,500 ककककुुुुलललल (ननननववववीीीीककककररररणणणणीीीीयययय ऊऊऊऊजजजजाााा (cid:22)(cid:22) (cid:22)(cid:22)DDDDोोोोतततत ) 18,500 11112222 वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन ससससममममाााापपपपनननन 4,000¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 149 • पपपप////ररररददददYYYYृृृृ यययय ----3333---- 11118888वववव(cid:7)(cid:7)(cid:7)(cid:7) ईईईईपपपपीीीीएएएएसससस ममममाााांगंगंगंग –––– उउउउuuuu ननननववववीीीीककककररररणणणणीीीीयययय ((((33330000,,,,000000000000 ममममगगेेगगेे ााााववववााााटटटट)))),,,, उउउउuuuu गगगगससैैससैै ((((11114444,,,,555544440000 ममममेगेगेगेगााााववववााााटटटट)))) (cid:1)(cid:1)(cid:1)(cid:1)ककककाााारररर 11112222 वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा कककक1111 (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा कककक1111 आआआआववववYYYYययययककककतततताााा ((((ममममेगेगेगेगााााववववााााटटटट मममम$$)))$$) हहहहााााइइइइ<<<<ोोोो 10,897 थथथथममममलल(cid:22)(cid:22)लल(cid:22)(cid:22) 67,703 कोयला 52,643 िल—ाइट 520 गैस 14,540 >>>>ययययििूूििूू 0000ललललययययरररर 5,300 ककककुुुुलललल (पपपपााााररररंंंंपपपप////ररररकककक) 88883333,,,,999900000000 पपपपववववनननन 15,000 ससससौौौौरररर 10,000 अअअअ>>>>यय यय (ननननववववीीीीककककररररणणणणीीीीयययय ऊऊऊऊजजजजाााा (cid:22)(cid:22) (cid:22)(cid:22)DDDDोोोोतततत ) 5,000 ककककुुुुलललल (ननननववववीीीीककककररररणणणणीीीीयययय ऊऊऊऊजजजजाााा (cid:22)(cid:22) (cid:22)(cid:22)DDDDोोोोतततत ) 30,000 11112222 वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन ससससममममाााापपपपनननन 4,000 • पपपप////ररररददददYYYYृृृृ यययय ----4444---- 11118888वववव(cid:7)(cid:7)(cid:7)(cid:7) ईईईईपपपपीीीीएएएएसससस ममममाााांगंगंगंग –––– उउउउuuuu ननननववववीीीीककककररररणणणणीीीीयययय ((((33330000,,,,000000000000 ममममगगेेगगेे ााााववववााााटटटट)))),,,, ििििननननtttt गगगगससैैससैै ((((2222,,,,555544440000 ममममेगेगेगेगााााववववााााटटटट)))) (cid:1)(cid:1)(cid:1)(cid:1)ककककाााारररर 11112222 वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा कककक1111 (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा ((((ममममेगेगेगेगााााववववााााटटटट मममम$$)))$$) हहहहााााइइइइ<<<<ोोोो 10,897 थथथथममममलल(cid:22)(cid:22)लल(cid:22)(cid:22) 66,903 कोयला+ िल—ाइट 63,843 िल—ाइट 520 गैस 2,540 >>>>ययययििूूििूू 0000ललललययययरररर 5,300 ककककुुुुलललल (पपपपााााररररंंंंपपपप////ररररकककक) 88883333,,,,111100000000 पपपपववववनननन 15,000 ससससौौौौरररर 10,000 अअअअ>>>>यय यय (ननननववववीीीीककककररररणणणणीीीीयययय ऊऊऊऊजजजजाााा (cid:22)(cid:22) (cid:22)(cid:22)DDDDोोोोतततत ) 5,000 ककककुुुुलललल (ननननववववीीीीककककररररणणणणीीीीयययय ऊऊऊऊजजजजाााा (cid:22)(cid:22) (cid:22)(cid:22)DDDDोोोोतततत ) 30,000 11112222 वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन ससससममममाााापपपपनननन 4,000150 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] उउउउपपपपययययRRु(cid:22)ु(cid:22)RRु(cid:22)ु(cid:22) पपपप////ररररददददYYYYृृृृ यययय'''' मममम $$ $$ सससस ेे ेे पपपप////ररररददददYYYYृृृृ यययय----1111 ककककोोोो 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा अअअअििििभभभभववववििृृििृृ (cid:31)(cid:31)(cid:31)(cid:31) कककक1111 आआआआययययोोोोजजजजननननाााा ककककेेेे ििििललललएएएए आआआआधधधधााााररररभभभभततूूततूू ममममााााममममलललल ेे ेे ककककेेेे MMMMपपपप मममम $$ $$ ममममााााननननाााा गगगगययययाााा हहहह ैै ैै।।।। आआआआधधधधााााररररभभभभततूूततूू ममममााााममममलललल ेेेे के ििििववववववववररररणणणण ििििननननttttााााननननससुुससुु ाााारररर हहहह::::dddd 11112222 वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककाााा ककककाााायययय``(cid:22)(cid:22)``(cid:22)(cid:22) मममम ककककुुुुलललल (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा आआआआववववYYYYययययककककतततताााा ---- 88887777,,,,111100000000 मेगावाट ((((पपपपााााररररंंंंपपपप////ररररकककक)))) हाइrो - 10,897 मेगावाट Cयूिdलयर - 5,300 मेगावाट थम2ल - 70,903 मेगावाट • कोयला+िल—ाइट - 68,363 मेगावाट • गैस - 2,540 मेगावाट 12व(cid:7) योजना के दौरान 87,100 मेगावाट (cid:18)मता अिभविृ (cid:23) आव)य क ह।ै हालां4क िनमा2णाधीन प3रयोजनाE क(cid:25) ि8थित के आधार पर 88,537 मेगावाट क(cid:25) कुल (cid:18)मता वाली ऐसी प3रयोजनाE क(cid:25) सूची तैयार क(cid:25) गई ह ै िजनका लाभ 12व(cid:7) योजना के दौरान <ा=त होन े क(cid:25) आशा ह ै और यह सचू ी अनुबंध 6.1 के Nप म(cid:17) संल‚न ह।ै इस बात का भी उjल ेख 4कया जा सकता ह ै 4क 12व(cid:7) योजना के दौरान संभािवत लाभ के िलए सूचीब(cid:23) क(cid:25) गई प3रयोजनाए ं वत2मान म (cid:17) िनमा2णाधीन ह।O उपयु2dत के अलावा कुछ अCय प3रयोजनाए ं भी िनमा2णाधीन/आयोजना के िविभCन चरण* पर ह O और ऐसी आशा ह ै 4क इन प3रयोजनाE क(cid:25) 8थ ापना 12व(cid:7) योजना के दौरान कर ली जाएगी। ऐसी प3रयोजनाE क(cid:25) सूची अनुबंध 6.2 म(cid:17) दी गई ह।ै इस <कार य4द 12व(cid:7) योजना के िलए िनधा23रत क(cid:25) गई प3रयोजनाE म(cid:17) अwात कारण* से कोई िवलंब होता ह ै तो अCय प3रयोजनाE(बैकअप प3रयोजनाE) क(cid:25) 8थ ापना 12व(cid:7) योजना के दौरान क(cid:25) जा सकती ह।ै इस <कार 12व(cid:7) योजना के दौरान लगभग 88,000 मेगावाट क(cid:25) (cid:18)मता अिभवृि(cid:23) क(cid:25) <बल संभावना ह।ै इसम (cid:17) कोई संदहे नह(cid:7) 4क इन प3रयोजनाE के िलए ईधन क(cid:25) आव)य कता ब,त बड़ी सम8य ा ह ै और इसका समाधान करना आव)य क ह।ै 6666....6666 11113333वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन उउउउNNNNपप पप ााााददददनननन (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा ििििवववव(cid:2)(cid:2)(cid:2)(cid:2)तत तत ाााारररर ककककेेेे ििििललललएएएए ससससभभंंभभंं ााााििििववववतततत ययययोोोोजजजजननननाााा 13व(cid:7) योजना के दौरान संभािवत (cid:18)मता अिभवृि(cid:23) आव)यकता का आकलन करन े के िलए िनbन िलिखत त(cid:129)य * के आधार पर अ(cid:2)य यन 4कए गए : • मांग पर िवचार 18व(cid:7) ईपीएस 3रपोट2 म(cid:17) 4दए गए पूवा2नुमान* के अनुसार 4कया जाए – पीक लोड 2,83,470; ऊजा2 आव)य कता -1904 िबिलयन यूिनट • ि8पJनग 3रजव2 –––– 5% अथा2त लगभग 14,000 मेगावाट • िव)व सनीयता मानदडं - लोड लाभ<दता क(cid:25) हािन<<<< 0.2 %%%% और <ेिषत न क(cid:25) गयी ऊजा2<<<< 0.05 % • 11व(cid:7) पंचवष(cid:12)य योजना के दौरान वा8त िवक (cid:18)मता अिभवृि(cid:23) 54,964 मेगावाट ह।ै • संगत प3रद)ृ य म(cid:17) 12व(cid:7) योजना के िलए लगभग 87,100 मेगावाट क(cid:25) (cid:18)मता अिभवृि(cid:23)। • 4000 मेगावाट (cid:18)मता का समापन िजसम(cid:17) 2,000 मेगावाट से कम (cid:18)मता वाली कोयला यूिनट(cid:17) (1982 स े पहले 8थ ािपत) और ऐसी गैस यूिनट(cid:17) जो 1992 से पहल े 8थ ािपत (20 वष2 से अिधक पुरानी) क(cid:25) गई थ(cid:7), शािमल ह O ।।।। • पड़ोसी दशे * से 8,040 मगे ावाट हाइrो (cid:18)मता का आयात।¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 151 6666....7777 11113333वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ससससभभंंभभंं ााााििििववववतततत (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा ििििवववव(cid:2)(cid:2)(cid:2)(cid:2)तत तत ाााारररर अअअअ((((यय यय ययययनननन पपपप////ररररणणणणाााामममम िव]सनीयता मानदड* के अनुNप मांग को पूरा करन े के िलए 13व(cid:7) पंचवष(cid:12)य योजना के दौरान कुल (cid:18)मता अिभवृि(cid:23) आव)यकता का मूjयांकन करन े के उ()े य स े ईजीईएएस अ(cid:2)ययन 4कए गए। 12व(cid:7) योजना म(cid:17) 4कए गए अ(cid:2)य यन* के अनसु ार मौसम सबं ंधी अ(cid:2)य यन। हाइrो, गैस और Cयूिdलयर आधा3रत (cid:18)मता को उ– <ाथिमकता दी जाती ह,ै dय*4क इनम(cid:17) कम काब2न उQसज2न रणनीित क(cid:25) दिृ ~ से लाभ अंतPनिहत ह।O अतः इस (cid:18)मता को िविभp प3रद)ृ य* म(cid:17) अिनवाय2 Nप स े संचािलत क(cid:25) जान े वाली (cid:18)मता के Nप म(cid:17) माना गया ह।ै नवीकरणीय (cid:18)मता को अिनवाय2 Nप स े संचािलत क(cid:25) जाने वाली (cid:18)मता के Nप म(cid:17) भी माना गया ह।ै 13व(cid:7) पंचवष(cid:12)य योजना के दौरान सभं ािवत उQप ादन (cid:18)मता अिभवृि(cid:23) के िलए चार प3रद)ृ य िवकिसत 4कए गए । ये प3रद)ृ य िन•ानुसार ह:O प3रद)ृ य 1 – िन• नवीकरणीय (30,500 मेगावाट), गैसरिहत प3रद)ृ य 2 – िन• नवीकरणीय (30,500 मेगावाटटटट), उ– गैस (13,000 मेगावाट) प3रद)ृ य 3 – उ– नवीकरणीय (45,000 मेगावाटटटट), उ– गैस (13,000 मेगावाट) प3रद)ृ य 4 – उ– नवीकरणीय (45,000 मेगावाट), गैसरिहत उउउउपपपपयययय00ु(cid:22)ु(cid:22)00ु(cid:22)ु(cid:22) तत तत अअअअििििननननववववाााायययय (cid:22)(cid:22) (cid:22)(cid:22) पपपप////ररररययययोोोोजजजजननननाााा???? पपपपरररर ििििववववचचचचाााारररर ककककररररतततत ेे ेे jjjjएएएए बबबबककककााााययययाााा (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा अअअअििििभभभभववववििृृििृृ (cid:31)(cid:31)(cid:31)(cid:31) लललल(cid:19)(cid:19)(cid:19)(cid:19)यय यय '''' ककककोोोो ककककोोोोययययललललाााा आआआआधधधधाााा////ररररतततत पपपप////ररररययययोोोोजजजजननननाााा???? सससस ेे ेे (cid:1)(cid:1)(cid:1)(cid:1)ाााा7777तत तत ककककररररनननन ेेेे ककककाााा (cid:1)(cid:1)(cid:1)(cid:1)(cid:2)(cid:2)(cid:2)(cid:2)तत तत ाााावववव हहहह।।ैै।।ैै य े प3रद)ृ य 12व(cid:7) योजना के दौरान पूरे 4कए गए संगत प3रद)ृ य * पर आधा3रत ह।O चार* प3रद)ृ य * के अनNु प 13व(cid:7) योजना के दौरान (cid:18)मता अिभवृि(cid:23) आव)य कता के िववरण नीच े 4दए अनुसार ह:O चचचचाााारररर'''' पपपप////ररररददददYYYYृृृृ यययय'''' मममम $$ $$ 11113333वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन 8888,,,,000044440000 ममममेगेगेगेगााााववववााााटटटट ककककेेेे हहहहााााइइइइ<<<<ोोोो आआआआययययाााातततत पपपपरररर ििििववववचचचचाााारररर 3333ककककययययाााा गगगगययययाााा हहहह।।ैै।।ैै • पपपप////ररररददददYYYYृृृृ यययय ----1111 –––– ििििननननtttt ननननववववीीीीककककररररणणणणीीीीयययय ((((33330000,,,,555500000000 ममममेगेगेगेगााााववववााााटटटट)))),,,, गगगगससैैससैै ररररििििहहहहतततत ----ककककाााारररर 11113333वववव.... ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन (cid:28)(cid:28)(cid:28)(cid:28)ममममतततताााा अअअअििििभभभभववववृिृिृिृि1111 आआआआवववव2222ययययककककतततताााा ((((ममममगगेेगगेे ााााववववााााटटटट मममम))33))33 हहहहााााइइइइ6666ोोोो 12,000 थथथथममममलल((लल(( 56,400 ककककोोोोययययललललाााा 56,400 गगगगससैैससैै 0 ))))ययययििूूििूू 8888ललललययययरररर 18,000 ककककुुुुलललल (पपपपााााररररंंंंपपपप(cid:17)(cid:17)(cid:17)(cid:17)ररररकककक) 88886666,,,,444400000000 ववववाााायययय ुु ुु 11,000 ससससौौौौरररर 16,000 अअअअ))))यय यय (ननननववववीीीीककककररररणणणणीीीीयययय ऊऊऊऊजजजजाााा (( ((;;;;ोोोोतततत ) 3,500 ककककुुुुलललल (ननननववववीीीीककककररररणणणणीीीीयययय ऊऊऊऊजजजजाााा ((((;;;;ोोोोतततत ) 30,500 11113 वववव.... ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन ससससममममाााापपपपनननन 4,000152 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] • पपपप////ररररददददYYYYृृृृ यययय ----2222 –––– ििििननननtttt ननननववववीीीीककककररररणणणणीीीीयययय ((((33330000,,,,555500000000 ममममेगेगेगेगााााववववााााटटटट)))) ---- उउउउuuuu गगगगससैैससैै ((((11113333,,,,000000000000 ममममेगेगेगेगााााववववााााटटटट)))) ----ककककाााारररर 11113333वववव.... ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन (cid:28)(cid:28)(cid:28)(cid:28)ममममतततताााा ((((ममममगगेेगगेे ााााववववााााटटटट मममम))33))33 हहहहााााइइइइ6666ोोोो 12,000 थथथथममममलल((लल(( 58,200 ककककोोोोययययललललाााा 45,200 गगगगससैैससैै 13,000 ))))ययययििूूििूू 8888ललललययययरररर 18,000 ककककुुुुलललल (पपपपााााररररंंंंपपपप(cid:17)(cid:17)(cid:17)(cid:17)ररररकककक) 88888888,,,,222200000000 ववववाााायययय ुु ुु 11,000 ससससौौौौरररर 16,000 अअअअ))))यय यय (ननननववववीीीीककककररररणणणणीीीीयययय ऊऊऊऊजजजजाााा (( ((;;;;ोोोोतततत ) 3,500 ककककुुुुलललल (ननननववववीीीीककककररररणणणणीीीीयययय ऊऊऊऊजजजजाााा ((((;;;;ोोोोतततत ) 30,500 11113 वववव.... ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन ससससममममाााापपपपनननन 4,000 • पपपप////ररररददददYYYYृृृृ यययय ----3333 –––– उउउउuuuu ननननववववीीीीककककररररणणणणीीीीयययय ((((44445555,,,,000000000000 ममममगगेेगगेे ााााववववााााटटटट)))) –––– उउउउuuuu गगगगससैैससैै ((((11113333,,,,000000000000 ममममेगेगेगेगााााववववााााटटटट)))) ----ककककाााारररर 11113333वववव.... ययययोोोोजजजजननननाााा (cid:28)(cid:28)(cid:28)(cid:28)ममममतततताााा ((((ममममगगेेगगेे ााााववववााााटटटट मममम))33))33 हहहहााााइइइइ6666ोोोो 12,000 थथथथममममलल((लल(( 50,200 ककककोोोोययययललललाााा 37,200 गगगगससैैससैै 13,000 ))))ययययििूूििूू 8888ललललययययरररर 18,000 ककककुुुुलललल (पपपपााााररररंंंंपपपप(cid:17)(cid:17)(cid:17)(cid:17)ररररकककक) 88880000,,,,222200000000 ववववाााायययय ुु ुु 20,000 ससससौौौौरररर 20,000 अअअअ))))यय यय (ननननववववीीीीककककररररणणणणीीीीयययय ऊऊऊऊजजजजाााा (( ((;;;;ोोोोतततत ) 5,000 ककककुुुुलललल (ननननववववीीीीककककररररणणणणीीीीयययय ऊऊऊऊजजजजाााा ((((;;;;ोोोोतततत ) 45,000 11113 वववव.... ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन ससससममममाााापपपपनननन 4,000 • पपपप////ररररददददYYYYृृृृ यययय ----4444 –––– उउउउuuuu ननननववववीीीीककककररररणणणणीीीीयययय ((((44445555,,,,000000000000 ममममगगेेगगेे ााााववववााााटटटट)))) –––– गगगगससैैससैै ररररििििहहहहतततत ----ककककाााारररर 11113333वववव.... ययययोोोोजजजजननननाााा (cid:28)(cid:28)(cid:28)(cid:28)ममममतततताााा ((((ममममगगेेगगेे ााााववववााााटटटट मममम))33))33 हहहहााााइइइइ6666ोोोो 12,000¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 153 थथथथममममलल((लल(( 54,800 ककककोोोोययययललललाााा 54,800 गगगगससैैससैै 0 ))))ययययििूूििूू 8888ललललययययरररर 18,000 ककककुुुुलललल (पपपपााााररररंंंंपपपप(cid:17)(cid:17)(cid:17)(cid:17)ररररकककक) 88884444,,,,888800000000 ववववाााायययय ुु ुु 20,000 ससससौौौौरररर 20,000 अअअअ))))यय यय (ननननववववीीीीककककररररणणणणीीीीयययय ऊऊऊऊजजजजाााा (( ((;;;;ोोोोतततत) 5,000 ककककुुुुलललल (ननननववववीीीीककककररररणणणणीीीीयययय ऊऊऊऊजजजजाााा ((((;;;;ोोोोतततत ) 45,000 11113 वववव.... ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन ससससममममाााापपपपनननन 4,000 उउउउपपपपययययRRु(cid:22)ु(cid:22)RRु(cid:22)ु(cid:22) पपपप////ररररददददYYYYृृृृ यययय'''' मममम $$ $$ सससस ेे ेेपपपप////ररररददददYYYYृृृृ यययय----1111 पपपपरररर 11113333वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ििििललललएएएए आआआआधधधधााााररररभभभभततूूततूू ममममााााममममलललल ेे ेे ककककेेेे MMMMपपपप मममम$$ $$ िवचार 3333ककककययययाााा गगगगययययाााा हहहह ैै ैै।।।। 13व(cid:7) योजना के दौरान आव)यक (cid:18)मता अिभवृि(cid:23) िन•ानुसार ह O : 11113333वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककाााायययय``(cid:22)(cid:22)``(cid:22)(cid:22) मममम कुल (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा ---- 88886666,,,,444400000000 मेगावाट ((((पारंप3रक) हाइrो - 12,000* मेगावाट Cयूिdलयर - 18,000 मेगावाट थर्मल - 56,400 मेगावाट कोयला -56,400 मेगावाट गैस - शूCय **** पड़ोसी दशे * के हाइrो =लांट* से आयाितत 8,040 मेगावाट को छोड़कर यह उjलेख 4कया जाए 4क एनपीसी के काय2Bम के अनुसार 13व(cid:7) योजना के दौरान 18,000 मेगावाट Cयूिdलयर (cid:18)मता पर िवचार 4कया गया ह ै । अगर यह (cid:18)मता पूरी नह(cid:7) क(cid:25) जाती ह ै तो इसे कोयला आधा3रत (cid:18)मता स े <ित8थ ािपत 4कया जा सकता ह।ै 13व(cid:7) योजना के दौरान (cid:18)मता अिभवृि(cid:23) नवीनतम <ौ#ोिग4कय* पर आधा3रत अिधक द(cid:18) यूिनट* से क(cid:25) जाएगी। थम2ल (cid:18)मता अिभवृि(cid:23) सभी मामल* म(cid:17) सुपर 4B3टकल <ौ#ोिगक(cid:25) वाली बड़ े आकार क(cid:25) यूिनट* अथा2त 660/800 मेगावाट (cid:18)मता वाली यूिनट* से क(cid:25) जाएगी। ये <यास 8व zछ और ह3रत िव#ुत के िलए हमारी रणनीितय* के अनुसार 4कए जा रह े ह।O यह िसफा3रश क(cid:25) जाती ह ै 4क 13व(cid:7) योजना के दौरान कोयला आधा3रत पावर =ल ांट* स े (cid:18)मता अिभवृि(cid:23) केवल सुपर 4B3टकल यूिनट* aारा ही क(cid:25) जानी चािहए। 13व(cid:7) योजना के दौरान आव)य क (cid:18)मता अिभवृि(cid:23) लगभग 86,400 मेगावाट के आसपास होगी। 12व(cid:7) योजना के दौरान (cid:18)मता अिभवृि(cid:23) के ल%य को पूरा न करने वाली प3रयोजनाE को 13व(cid:7) योजना के (cid:18)मता अिभवृि(cid:23) काय2Bम म(cid:17) शािमल 4कया जाएगा। इस <कार यह 8प !ट ह ै 4क 13व(cid:7) योजना के दौरान भारी माRा म(cid:17) (cid:18)मता अिभवृि(cid:23) आव)य क होगी िजसके िलए सभी संबंिधत* aारा 12व(cid:7) योजना के दौरान ही अि\म आयोजना/अि\म कार2वाई आव)य क ह।ै154 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 6666....8888 उउउउपपपपससससहहंंहहंं ाााारररर • 18व(cid:7) ईपीएस 3रपोट2 के अनुसार (cid:18)मता अिभवृि(cid:23) आयोजना के िलए िवचार 4कए गए िव#तु मांग पूवा2नुमान* के िववरण िनbन ानुसार ह:O (cid:3) 12व(cid:7) योजना के अंत म(cid:17) - पीक मांग 199,540 मेगावाट और ऊजा2 आव)य कता 1354 िबिलयन यूिनट। (cid:3) 13व(cid:7) योजना के अंत म(cid:17) - पीक मांग 28,3470 मेगावाट और ऊजा2 आव)य कता 1904 िबिलयन यूिनट। • 11व(cid:7) पंचवष(cid:12)य योजना के दौरान लगभग 54,964 मेगावाट क(cid:25) वा8त िवक (cid:18)मता अिभवृि(cid:23) के आधार पर 12व(cid:7) योजना के दौरान दशे म(cid:17) लगभग 87,100 मेगावाट (cid:18)मता अिभवृि(cid:23), एनईपी के अनुसार 5% ि8पJनग 3रजव2, लगभग 4,000 मेगावाट (cid:18)मता वाली पुरानी और अद(cid:18) थम2ल यिू नट* का समापन और सीईए aारा अपनाए गए 0.2% एलओएलपी और 0.05% ईएनएस के िव)व सनीयता मानदडं क(cid:25) आव)य कता होगी। • 12व(cid:7) योजना के िलए दशे म(cid:17) कुल (cid:18)मता अिभवृि(cid:23) क(cid:25) आव)य कता िनbन ानुसार <8त ािवत क(cid:25) गई ह:ै ससससपपंंपपंं ूणूणूणूण (cid:22)(cid:22) (cid:22)(cid:22)(cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा ((((ननननववववीीीीककककररररणणणणीीीीयययय ककककोोोो छछछछोोोोड़ड़ड़ड़ककककरररर)))) ---- 88887777,,,,111100000000 मेगावाट हाइrो - 10,897मेगावाट Cयूिdलयर - 5,300 मेगावाट थम2ल - 70,903 मेगावाट • कोयला - 67,843 मेगावाट • िल—ाइट - 520 मेगावाट • गैस - 2,540 मेगावाट ििििववववककककििििससससतततत कककक1111 जजजजाााानननन ेे ेे ववववााााललललीीीी आआआआववववYYYYयय यय कककक (cid:2)(cid:2)(cid:2)(cid:2)वव वव ददददशशेेशशेे ीीीी (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा---- 87,100 मेगावाट (पड़ोसी दशे * से 1,200 मेगावाट के आयात का अनुमान लगाया गया ह)ै । • 13व(cid:7) योजना के िलए दशे म(cid:17) कुल (cid:18)मता अिभवृि(cid:23) आव)य कता िनbन ानुसार <8त ािवत ह:ै ससससपपंंपपंं ूणूणूणूण (cid:22)(cid:22) (cid:22)(cid:22)(cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा ((((ननननववववीीीीककककररररणणणणीीीीयययय ककककोोोो छछछछोोोोड़ड़ड़ड़ककककरररर)))) ---- 88886666,,,,444400000000 मेगावाट हाइrो - 12,000 मेगावाट Cयूिdलयर - 18,000 मेगावाट थम2ल - 56,400 मेगावाट • कोयला - 56,400 मेगावाट हाइrो आयात – 8,040 मेगावाट • ििििववववककककििििससससतततत कककक1111 जजजजाााानननन ेे ेे ववववााााललललीीीी आआआआववववYYYYयय यय कककक (cid:2)(cid:2)(cid:2)(cid:2)वव वव ददददशशेेशशेे ीीीी (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा---- 87,100 मेगावाट (पड़ोसी दशे * से 1,200 मेगावाट के आयात का अनुमान लगाया गया ह)ै । ----------------++++++++++++----------------¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 155 अअअअननननबबुुबबुु धधंंधधंं 6666....1111 ऐऐऐऐससससीीीी ििििननननममममााााणण(cid:22)(cid:22)णण(cid:22)(cid:22) ााााधधधधीीीीनननन पपपप////ररररययययोोोोजजजजननननाााा???? ककककाााा ससससााााररररााााशशंंशशंं ििििजजजजननननककककाााा ललललााााभभभभ 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ((((2222000011112222----11117777)))) ककककेेेे ददददौौौौरररराााानननन ििििममममललललनननन ेे ेेकककक1111 ससससभभंंभभंं ााााववववननननाााा हहहह ैैैै ((((आआआआककंंककंं ड़ड़ड़ड़ ेे ेेममममगगेेगगेे ााााववववााााटटटट मममम$$))$$)) थथथथममममलललल(cid:4)(cid:4)(cid:4)(cid:4) ििििववववववववररररणणणण हहहहााााइइइइ%%%%ोोोो ककककुुुुलललल थथथथममममलललल(cid:4)(cid:4)(cid:4)(cid:4) (cid:14)(cid:14)(cid:14)(cid:14)यय यय िििूूिूू))))ललललययययरररर जजजजोोोोड़ड़ड़ड़ (cid:12)(cid:13)(cid:14)(cid:15)(cid:16)(cid:1) िल(cid:3) ना(cid:17)(cid:18)(cid:1) (cid:19)(cid:20)(cid:21)(cid:22)(cid:1)(cid:23)(cid:15)(cid:23)(cid:24)(cid:25)(cid:26)(cid:1) मममम****यययय (cid:11)(cid:11)(cid:11)(cid:11)(cid:13)(cid:13)(cid:13)(cid:13)ेेेे 6666000000004444 (cid:3)(cid:5)(cid:27)(cid:6)(cid:6)(cid:1) (cid:4)(cid:2)(cid:6)(cid:1) (cid:27)(cid:4)(cid:10)(cid:11)(cid:7)(cid:1) 11114444888877778888 5555333300000000 22226666111188882222 रररराााा(cid:10)(cid:10)(cid:10)(cid:10)यययय (cid:11)(cid:11)(cid:11)(cid:11)(cid:13)(cid:13)(cid:13)(cid:13)ेेेे 1111666600008888 (cid:3)(cid:4)(cid:4)(cid:3)(cid:6)(cid:1) (cid:6)(cid:1) (cid:3)(cid:10)(cid:3)(cid:4)(cid:11)(cid:6)(cid:1) 11113333999922222222 0000 11115555555533330000 ििििननननजजजजीीीी (cid:11)(cid:11)(cid:11)(cid:11)(cid:13)(cid:13)(cid:13)(cid:13)ेेेे 3333222288885555 (cid:9)(cid:5)(cid:4)(cid:10)(cid:6)(cid:1) (cid:4)(cid:10)(cid:6)(cid:1) (cid:6)(cid:11)(cid:6)(cid:1) 44443333555544440000 0000 44446666888822225555 अअअअििििखखखखलललल भभभभााााररररतततत 11110000888899997777 (cid:7)(cid:8)(cid:4)(cid:27)(cid:6)(cid:1) (cid:2)(cid:4)(cid:6)(cid:1) (cid:4)(cid:2)(cid:5)(cid:8)(cid:11)(cid:7)(cid:1) 77772222333344440000 5555333300000000 88888888555533337777 ++++लल लल ॉॉॉॉकककक आआआआईईईईएएएएममममपपपपीीीी ससससीीीीआआआआईईईईएएएएलललल ++++लल लल ॉॉॉॉकककक ववववााााशशशशररररीीीी ....ररररजजजज))))ेेेे टटटट आआआआवववव1111यययय कककक ससससपपपपंंंं कककक(cid:4)(cid:4)(cid:4)(cid:4) जजजजोोोोड़ड़ड़ड़ ((((टटटटीीीीएएएएलललल)))) ((((ककककोोोोययययललललाााा)))) ककककोोोोययययललललाााा आआआआधधधधाााा....ररररतततत (cid:2)(cid:6)(cid:2)(cid:6)(cid:9)(cid:1) (cid:2)(cid:9)(cid:9)(cid:6)(cid:1) (cid:27)(cid:5)(cid:3)(cid:6)(cid:1) (cid:9)(cid:4)(cid:9)(cid:7)(cid:1) (cid:5)(cid:5)(cid:6)(cid:1) (cid:9)(cid:2)(cid:6)(cid:1) 66669999222288880000 (cid:11)(cid:11)(cid:11)(cid:11)ममममतततताााा 2222000011112222----11113333 2222000011113333----11114444 2222000011114444----11115555 2222000011115555----11116666 2222000011116666----11117777 TTTTOOOOTTTTAAAALLLL मममम<<<<यय यय (cid:28)(cid:28)(cid:28)(cid:28),,ेे,,ेे 6666666666668888 4992 1870 4491 8888111166660000 22226666111188882222 रररराााा====यय यय (cid:28)(cid:28)(cid:28)(cid:28),,ेे,,ेे 4048 3866 4846 2260 510 11115555555533330000 ििििननननजजजजीीीी (cid:28)(cid:28)(cid:28)(cid:28),,ेे,,ेे 7777333377770000 10445 14242 10328 4444444444440000 44446666888822225555 अअअअििििखखखखलललल भभभभााााररररतततत 11118888000088886666 19303 20958 17079.0 11113333111111110000 88888888555533337777 हहहहााााइइइइ6666ोोोो 802 2639 2543 1613 3300 11110000888899997777 थथथथममममलल((लल(( 15284 16664 17915 15466 7010 77772222333344440000 ))))यय यय ििूूििूू 8888ललललययययरररर 2000 0 500 0 2800 5555333300000000 ककककुुुुलललल 11118888000088886666 11119999333300003333 22220000999955558888 11117777000077779999 11113333111111110000 88888888555533337777156 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ऐऐऐऐससससीीीी ििििननननममममााााणण(cid:22)(cid:22)णण(cid:22)(cid:22) ााााधधधधीीीीनननन पपपप////ररररययययोोोोजजजजननननाााा???? कककक1111 ससससचचूूचचूू ीीीी ििििजजजजननननककककाााा ललललााााभभभभ 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ((((2222000011112222----11117777)))) ककककेेेे ददददौौौौरररराााानननन ििििममममललललनननन ेे ेेकककक1111 ससससभभंंभभंं ााााववववननननाााा हहहह ैैैै (cid:21)(cid:21)(cid:21)(cid:21)ममममतततताााा (cid:1)(cid:1)(cid:1)(cid:1)ममममााााककंंककंं पपपप(cid:7)(cid:7)(cid:7)(cid:7)ररररययययोोोोजजजजननननाााा ककककेेेे ननननाााामममम रररराााा(cid:15)(cid:15)(cid:15)(cid:15)यय यय ििििववववककककााााससससककककतततताााा (cid:20)(cid:20) (cid:20)(cid:20) (cid:21)(cid:21)(cid:21)(cid:21)(cid:22)(cid:22)ेे(cid:22)(cid:22)ेे (cid:23)(cid:23)(cid:23)(cid:23)धधधधनननन (cid:25)(cid:25)(cid:25)(cid:25)ककककाााारररर ((((ममममेगेगेगेगााााववववााााटटटट मममम))(cid:26)(cid:26)))(cid:26)(cid:26) 1 लोअर जुराला एचईपी आं(cid:3)(cid:4)देश एपीजेनको एस हाइ(cid:11)ो 240 2 पुिल(cid:17)चताला एचईपी आं(cid:3)(cid:4)देश एपीजेनको एस हाइ(cid:11)ो 120 3 नागाजु(cid:24)न सागर टीआर एचईपी आं(cid:3)(cid:4)देश एपीजेनको एस हाइ(cid:11)ो 50 (cid:27)ी दामोदरम संजीवै या टीपीपी 4 आं(cid:3)(cid:4)देश एपीजेनको एस कोयला 1600 (कृ$ण प&णम टीपीपी) यू1,2 5 रायल सीमा टीपीपी यू6 आं(cid:3)(cid:4)देश एपीजेनको एस कोयला 600 6 थि(मनाप&नम टीपीपी यू3,4 आं(cid:3)(cid:4)देश मीना)ी एनज+ (cid:4)ाइवेट िलिमटेड पी कोयला 700 नागाजु(cid:24)न कं./ 0श न कंपनी िलिमटेड पीएच-I नागाजु(cid:24)न कं./ 0श न कंपनी 7 आं(cid:3)(cid:4)देश पी कोयला 1320 यू-1,2 िलिमटेड थम(cid:24)ल पावरटेक कॉरपोरेशन 8 पैनमपुरम टीपीपी यू- 1,2 आं(cid:3)(cid:4)देश पी कोयला 1320 िलिमटेड 9 भावनाप3डु टीपीपी यू-1,2 आं(cid:3)(cid:4)देश इ.ट को.ट एनज+ पी कोयला 1320 10 थि(मनाप&नम टीपीपी यू-1,2 आं(cid:3)(cid:4)देश मीना)ी एनज+ (cid:4)ाइवेट िलिमटेड पी कोयला 300 िस(ह ापुरी एनज+ (cid:4)ाइवेट 11 िस(ह ापुरी टीपीपी पीएच-I, यू 2 आं(cid:3)(cid:4)देश पी कोयला 150 िलिमटेड 12 िह4द जू ा टीपीपी, यूU1-2 आं(cid:3)(cid:4)देश िह4द जु ा पी कोयला 1050 उउउउपपपप जजजजोोोोड़ड़ड़ड़ ((((अअअअ(cid:28)(cid:28)(cid:28)(cid:28)णणणणााााचचचचलललल (cid:25)(cid:25)(cid:25)(cid:25)ददददेशेशेशेश)))) 8888777777770000 1 पारे एचईपी अ7. (cid:4). नीपको सी हाइ(cid:11)ो 110 2 काम8ग एचईपी अ7. (cid:4). नीपको सी हाइ(cid:11)ो 600 3 सुबांिसरी लोअर एचईपी अ7. (cid:4). एनएचपीसी सी हाइ(cid:11)ो 1000 उउउउपपपप जजजजोोोोड़ड़ड़ड़ ((((अअअअ(cid:28)(cid:28)(cid:28)(cid:28)णणणणााााचचचचलललल (cid:25)(cid:25)(cid:25)(cid:25)ददददेेशशेेशश)))) 1111777711110000 1 ब:गै यागांव टीपीपी यू 1,2,3 असम एनटीपीसी सी कोयला 750 2 नाम;प सीसीजीटी असम एपीजीसीएल एस गैस 100 उउउउपपपप जजजजोोोोड़ड़ड़ड़ ((((अअअअससससमममम)))) 888855550000 1 मुज<फरपुर(कांटी) टीपीपी यू 3,4 िबहार एनटीपीसी जेवी सी कोयला 390 2 बाढ़ एसटीपीपी-I यू1,2,3 िबहार एनटीपीसी सी कोयला 1980 3 बाढ़ एसटीपीपी -II यू 1,2 िबहार एनटीपीसी सी कोयला 1320 4 नबीनगरटीपीपी यू1-4 िबहार एनटीपीसी जेवी सी कोयला 1000 उउउउपपपप जजजजोोोोड़ड़ड़ड़ ((((ििििबबबबहहहहाााारररर)))) 4444666699990000 1 िसपाट-I टीपीपी यू 3 छ?त ीसगढ़ एनटीपीसी सी कोयला 660 2 कोरबा पि@म एसटी.III टीपीपी यू5 छ?त ीसगढ़ सीएसईबी एस कोयला 500 3 मारवा टीपीपी यू1-2 छ?त ीसगढ़ सीएसईबी एस कोयला 1000 कोरबा वे.ट कंपनी पावर 4 अवंथा भंडार टीपीपी U1 छ?त ीसगढ़ पी कोयला 600 िलिमटेड मा7ती ि0लन कोल एAड पावर िलिमटेड मा7ती ि0लन कोल एAड पावर 5 छ?त ीसगढ़ पी कोयला 300 टीपीपी U1 िलिमटेड¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 157 (cid:21)(cid:21)(cid:21)(cid:21)ममममतततताााा (cid:1)(cid:1)(cid:1)(cid:1)ममममााााककंंककंं पपपप(cid:7)(cid:7)(cid:7)(cid:7)ररररययययोोोोजजजजननननाााा ककककेेेे ननननाााामममम रररराााा(cid:15)(cid:15)(cid:15)(cid:15)यय यय ििििववववककककााााससससककककतततताााा (cid:20)(cid:20) (cid:20)(cid:20) (cid:21)(cid:21)(cid:21)(cid:21)(cid:22)(cid:22)ेे(cid:22)(cid:22)ेे (cid:23)(cid:23)(cid:23)(cid:23)धधधधनननन (cid:25)(cid:25)(cid:25)(cid:25)ककककाााारररर ((((ममममेगेगेगेगााााववववााााटटटट मममम))(cid:26)(cid:26)))(cid:26)(cid:26) 6 लBको अमरकंटक टीपीपी U- 3,4 छ?त ीसगढ़ लBको अमरकंटक (cid:4)ाइवेट िलिमटेड पी कोयला 1320 आर.के.एम. पावरजेन (cid:4)ाइवेट 7 उचपDडा टीपीपी U1-3 छ?त ीसगढ़ पी कोयला 1080 िलिमटेड एसकेएस इ.प ात एAड पावर 8 (cid:17)वजकोट (दार(cid:24)मपुरा)टीपीपी U1-3 छ?त ीसगढ़ पी कोयला 900 िलिमटेड केएसके महानदी पावर कंपनी 9 अकलतारा (नEरयारा) टीपीपी U 1-3 छ?त ीसगढ़ पी कोयला 1800 िलिमटेड 10 कसाइपFल ी टीपीपी U 2 छ?त ीसगढ़ एसीबी इंिडया पी कोयला 135 11 .व ाि.तक कोरबा टीपीपी U 1 छ?त ीसगढ़ एसीबी इंिडया पी कोयला 25 12 वंदना िवGुत टीपीपी U 1,2 छ?त ीसगढ़ वंदना िवGुत पी कोयला 270 भारत एFय ुिमिनयम कंपनी 13 बालको टीपीपी U-1,2 छ?त ीसगढ़ पी कोयला 600 िलिमटेड 14 एथेना (cid:17)सघतराइ टीपीपी U-1 छ?त ीसगढ़ एथेना छ?त ीसगढ़ पावर िलिमटेड पी कोयला 600 15 डी बी पावर टीपीपी U-1,2 छ?त ीसगढ़ डीबी पावर िलिमटेड पी कोयला 1200 16 टी आर एन एनज+ टीपीपी U-1,2 छ?त ीसगढ़ टी आर एन एनज+ पी कोयला 600 17 रितजा टीपीपी छ?त ीसगढ़ एसीबी इंिडया पी कोयला 50 18 रायगढ़ टीपीपी U1,2 छ?त ीसगढ़ (cid:17)जदल पावर िलिमटेड पी कोयला 1200 उउउउपपपप जजजजोोोोड़ड़ड़ड़((((छछछछ####तत तत ीीीीससससगगगगढ़ढ़ढ़ढ़)))) 11112222888844440000 1 (cid:4)गित-III(बवाना) सीसीजीटी IदFल ी पीपीसीएल एस गैस/LNG 750 उउउउपपपप जजजजोोोोड़ड़ड़ड़((((%%%%दददद&&&&लल लल ीीीी)))) 777755550000 1 केएपीपी U-3,4 गुजरात एनपीसी सी 4य ूि0लयर 1400 2 िस0क ा टीपीपी ए0स ट8शन U3 गुजरात जीएसइसील एस कोयला 250 3 उकाई टीपीपी ए0स ट8शन U6 गुजरात जीएसइसील एस कोयला 500 4 पीपावव जेवी सीसीजीटी Jल ॉक -1,2 गुजरात जीएसइसील एस गैस/एलएनजी 702 5 मुंKा यूएम पीपी, U 2 गुजरात द टाटा पावर कंपनी िलिमटेड पी कोयला 800 6 सलाया टीपीपी U 2 गुजरात ए.स ार पावर सलाया िलिमटेड पी कोयला 600 उउउउपपपप जजजजोोोोड़ड़ड़ड़((((गगगगजजुुजजुु रररराााातततत)))) 4444222255552222 1 पब(cid:24)ती-II एचईपी िह. (cid:4). एनएचपीसी सी हाइ(cid:11)ो 800 2 रामपुर एचईपी िह. (cid:4). एसजेवीएनएल सी हाइ(cid:11)ो 412 3 कोलडैम एचईपी िह. (cid:4). एनटीपीसी सी हाइ(cid:11)ो 800 4 चमेरा-III एचईपी िह. (cid:4). एनएचपीसी सी हाइ(cid:11)ो 231 5 पब(cid:24)ती- III एचईपी िह. (cid:4). एनएचपीसी सी हाइ(cid:11)ो 520 6 कशांग- I एचईपी िह. (cid:4). एचपीपीसीएल एस हाइ(cid:11)ो 65 7 यूएचएल-III एचईपी िह. (cid:4). बीवीपीसी एस हाइ(cid:11)ो 100 8 सवारा कु3डु एचईपी िह. (cid:4). एचपीपीसीएल एस हाइ(cid:11)ो 111 9 कशांग II एAड & III एचईपी िह. (cid:4). एचपीपीसीएल एस हाइ(cid:11)ो 130 10 सBज एचईपी िह. (cid:4). एचपीपीसीएल एस हाइ(cid:11)ो 100 एनएसएल Eटडांग पावर 11 EटडLग-I एचईपी िह. (cid:4). पी हाइ(cid:11)ो 100 जेनरेशन िलिमटेड िहमाचल सोरांग पावर (cid:4)ाइवेट 12 सोरांग एचईपी िह. (cid:4). पी हाइ(cid:11)ो 100 िलिमटेड158 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] (cid:21)(cid:21)(cid:21)(cid:21)ममममतततताााा (cid:1)(cid:1)(cid:1)(cid:1)ममममााााककंंककंं पपपप(cid:7)(cid:7)(cid:7)(cid:7)ररररययययोोोोजजजजननननाााा ककककेेेे ननननाााामममम रररराााा(cid:15)(cid:15)(cid:15)(cid:15)यय यय ििििववववककककााााससससककककतततताााा (cid:20)(cid:20) (cid:20)(cid:20) (cid:21)(cid:21)(cid:21)(cid:21)(cid:22)(cid:22)ेे(cid:22)(cid:22)ेे (cid:23)(cid:23)(cid:23)(cid:23)धधधधनननन (cid:25)(cid:25)(cid:25)(cid:25)ककककाााारररर ((((ममममेगेगेगेगााााववववााााटटटट मममम))(cid:26)(cid:26)))(cid:26)(cid:26) टBगनु रोमई पावर जेनरेशन 13 टBगनु रोमई-I एचईपी िह. (cid:4). पी हाइ(cid:11)ो 44 िलिमटेड 14 बुिधल एचईपी िह. (cid:4). लBको Nीन पावर (cid:4)ाइवेट िलिमटेड पी हाइ(cid:11)ो 70 उउउउपपपप जजजजोोोोड़ड़ड़ड़ ((((ििििहहहहममममााााललललचचचचलललल(cid:25)(cid:25)(cid:25)(cid:25)ददददेेशशेेशश)))) 3333555588883333 1 इंIदरा गांधी टीपीपी (झQज र) जेवी U-3 हEरयाणा एनटीपीसी सी कोयला 500 2 इंIदरा गांधी झQज र टीपीपी U2 हEरयाणा चाइना लाइट पावर पी कोयला 660 उउउउपपपप जजजजोोोोड़ड़ड़ड़ ((((हहहह(cid:7)(cid:7)(cid:7)(cid:7)ररररययययााााणणणणाााा)))) 1111111166660000 1 Iकशन गंगा एचईपी ज(मू कRम ीर एनएचपीसी सी हाइ(cid:11)ो 330 2 यूआरआई-II एचईपी ज(मू कRम ीर एनएचपीसी सी हाइ(cid:11)ो 240 3 िनमू बागजो एचईपी ज(मू कRम ीर एनएचपीसी सी हाइ(cid:11)ो 45 4 चूटक एचईपी ज(मू कRम ीर एनएचपीसी सी हाइ(cid:11)ो 44 जे एAड के .ट ेट पावर Msवलपम8ट 5 बगिलहार-II एचईपी ज(मू कRम ीर एस हाइ(cid:11)ो 450 कॉरपोरेशन िलिमटेड उउउउपपपप जजजजोोोोड़ड़ड़ड़((((जजजज((((मम मम ूू ूूएएएए++++डड डड कककक----मम मम ीीीीरररर)))) 1111111100009999 1 बोकारो टीपीपी ए ईए0स पी U1 झारखंड डीवीसी सी कोयला 500 2 कोडरमा टीपीपी U2 झारखंड डीवीसी सी कोयला 500 3 माता(cid:27)ी उषा टीपीपी पीएच-I U 1,2 झारखंड कारपोरेट पावर िलिमटेड पी कोयला 540 आधुिनक पावर एAड नेचुरल EरसोसTज आधुिनक पावर एAड नेचुरल 4 झारखंड पी कोयला 540 िलिमटेड टीपीपी U1,2 EरसोसTज िलिमटेड उउउउपपपप जजजजोोोोड़ड़ड़ड़((((झझझझााााररररखखखखडडंंडडंं )))) 2222000088880000 1 थोE&यार एचईपी केरल केएसईबी एस हाइ(cid:11)ो 40 2 पिFलवासल एचईपी केरल केएसईबी एस हाइ(cid:11)ो 60 उउउउपपपप जजजजोोोोड़ड़ड़ड़((((ककककेेेेररररलललल)))) 111100000000 1 (cid:17)वUय ाचल टीपीपी एसटी-IV U-11,12 मUय (cid:4)देश एनटीपीसी सी कोयला 1000 2 सतपुरा टीपीपी ए0स ट8शन U-10,11 मUय (cid:4)देश एमपीजेनको एस कोयला 500 3 (cid:27)ी (cid:17)सघाजी टीपीपी U-1,2 मUय (cid:4)देश एमपीजेनको एस कोयला 1200 एमबी पावर (मUय (cid:4)देश) 4 अ4न ुपुर टीपीपी पीएच-I U1,2 मUय (cid:4)देश पी कोयला 1200 िलिमटेड बीना पावर सVल ाई कंपनी 5 बीना टीपीपी U 1,2 मUय (cid:4)देश पी कोयला 500 िलिमटेड (जेपी Nुप) 6 ससन यूएमपीपी U 1,2 मUय (cid:4)देश Eरलायंस पावर िलिमटेड पी कोयला 1320 7 महRे व र एचईपी U 1-10 मUय (cid:4)देश एसएमएचपीसीएल पी हाइ(cid:11)ो 400 डीबी पावर (मUय (cid:4)देश) 8 डीबी पावर टीपीपी, िसिWU-1 मUय (cid:4)देश पी कोयला 660 िलिमटेड 9 झबुआ टीपीपी U1 मUय (cid:4)देश झबुआ पावर िलिमटेड पी कोयला 600 उउउउपपपप जजजजोोोोड़ड़ड़ड़((((मममम....यय यय (cid:25)(cid:25)(cid:25)(cid:25)ददददेशेशेशेश)))) 7777333388880000 1 मौदा टीपीपी U1,2 महारा$/ एनटीपीसी सी कोयला 1000 2 चंKपुरटीपीपी ए0स ट8शन U 8 महारा$/ एमएएचजेनको एस कोयला 500¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 159 (cid:21)(cid:21)(cid:21)(cid:21)ममममतततताााा (cid:1)(cid:1)(cid:1)(cid:1)ममममााााककंंककंं पपपप(cid:7)(cid:7)(cid:7)(cid:7)ररररययययोोोोजजजजननननाााा ककककेेेे ननननाााामममम रररराााा(cid:15)(cid:15)(cid:15)(cid:15)यय यय ििििववववककककााााससससककककतततताााा (cid:20)(cid:20) (cid:20)(cid:20) (cid:21)(cid:21)(cid:21)(cid:21)(cid:22)(cid:22)ेे(cid:22)(cid:22)ेे (cid:23)(cid:23)(cid:23)(cid:23)धधधधनननन (cid:25)(cid:25)(cid:25)(cid:25)ककककाााारररर ((((ममममेगेगेगेगााााववववााााटटटट मममम))(cid:26)(cid:26)))(cid:26)(cid:26) 3 कोराडी टीपीपी ए0स ट8शन U 8 महारा$/ एमएएचजेनको एस कोयला 660 4 पल+ टीपीपी U 3 महारा$/ एमएएचजेनको एस कोयला 250 इंिडया बुFस - अमरावती टीपीपी पीएच-I, 5 महारा$/ इंिडया बुFस पावर िलिमटेड पी कोयला 1350 U1-5 6 इंिडया बुFस - नािसक टीपीपी पीएच-I,U1-5 महारा$/ इंिडया बुFस Eरयलटेक िलिमटेड पी कोयला 1350 धारीवाल इंXा./ 0च र(पी) िलिमटेड टीपीपी धारीवाल इंXा./ 0च र(पी) 7 महारा$/ पी कोयला 600 U1,2 िलिमटेड जीएमआर एमको एनज+ 8 ईएमसीओ वरोरा टीपीपी U 1,2 महारा$/ पी कोयला 600 िलिमटेड 9 बुतीबोरी टीपीपी पीएच -II U 1 महारा$/ िवदभ(cid:24) इंड./ ीज पावर िलिमटेड पी कोयला 300 लBको महानदी पावर (cid:4)ाइवेट 10 लBको महानदी, िवदभ(cid:24) टीपीपी U1,2 महारा$/ पी कोयला 1320 िलिमटेड 11 ितरोदा टीपीपी पीएच-I U 1,2 महारा$/ अदानी पावर िलिमटेड पी कोयला 1320 12 ितरोदा टीपीपी पीh-II U1 महारा$/ अदानी पावर िलिमटेड पी कोयला 660 13 जीईपीएल टीपीपी U-1,2 महारा$/ गुVत ा एनज+ (cid:4)ाइवेट िलिमटेड पी कोयला 120 आइिडयल एनज+ (cid:4)ोजे0Y स 14 बेला टीपीपी U 1 महारा$/ पी कोयला 270 िलिमटेड उउउउपपपप जजजजोोोोड़ड़ड़ड़((((ममममहहहहाााारररराााा////00 00 )))) 11110000333300000000 1 4य ू उ(Z ु एचईपी मेघालय एमइईसीएल एस हाइ(cid:11)ो 40 2 (cid:17)मटडु एसटी-I एचईपी एडीडीएल यूिनट मेघालय एमइएसईबी एस हाइ(cid:11)ो 42 उउउउपपपप जजजजोोोोड़ड़ड़ड़((((MMMMEEEEGGGGHHHHAAAALLLLAAAAYYYYAAAA)))) 88882222 1 तुइEरयाल एचईपी िमजोरम नीपको सी हाइ(cid:11)ो 60 उउउउपपपप जजजजोोोोड़ड़ड़ड़((((MMMMIIIIZZZZOOOORRRRAAAAMMMM)))) 66660000 (cid:17)जदल इंिडया थम(cid:24)ल पावर 1 देरांग टीपीपी U1 उड़ीसा पी कोयला 600 िलिमटेड इंड बरथ एनज+ (cid:4)ाइवेट िलिमटेड टीपीपी इंड बरथ पावर (उ?क ल) 2 उड़ीसा पी कोयला 700 U1,2 िलिमटेड. 3 लBको बबांध ढेनकनाल टीपीपी U 1 उड़ीसा लBको बबांध पी कोयला 660 के.वी.के. नीलांचल पावर Pvt. 4 के.वी.के. नीलांचल टीपीपी U 1 उड़ीसा पी कोयला 350 िलिमटेड. 5 कमलंगा टीपीपी U 1-3 उड़ीसा जीएमआर एनज+ पी कोयला 1050 6 .ट रलाइट टीपीपी U 4 उड़ीसा .ट रलाइट एनज+ पी कोयला 600 उउउउपपपप जजजजोोोोड़ड़ड़ड़((((उउउउड़ड़ड़ड़ीीीीससससाााा)))) 3333999966660000 1 तलवंडी साबो टीपीपी U1-3 पंजाब वेदांत पी कोयला 1980 2 गोइंदवल सािहब टीपीपी U1,2 पंजाब जीवीके इंड./ ीज पी कोयला 540 एल एAड टी पावर डेवलपम8ट 3 नभा टीपीपी U-1,2 पंजाब पी कोयला 1400 िलिमटेड उउउउपपपप जजजजोोोोड़ड़ड़ड़((((पपपपजजंंजजंं ााााबबबब)))) 3333999922220000 1 आरएपीपी U 7 एAड 8 राज.थ ान एनपीसी सी 4य ूि0लयर 1400 2 काली(cid:17)सध टीपीपी U1 राज.थ ान आरआरवीयूएनएल एस कोयला 600160 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] (cid:21)(cid:21)(cid:21)(cid:21)ममममतततताााा (cid:1)(cid:1)(cid:1)(cid:1)ममममााााककंंककंं पपपप(cid:7)(cid:7)(cid:7)(cid:7)ररररययययोोोोजजजजननननाााा ककककेेेे ननननाााामममम रररराााा(cid:15)(cid:15)(cid:15)(cid:15)यय यय ििििववववककककााााससससककककतततताााा (cid:20)(cid:20) (cid:20)(cid:20) (cid:21)(cid:21)(cid:21)(cid:21)(cid:22)(cid:22)ेे(cid:22)(cid:22)ेे (cid:23)(cid:23)(cid:23)(cid:23)धधधधनननन (cid:25)(cid:25)(cid:25)(cid:25)ककककाााारररर ((((ममममेगेगेगेगााााववववााााटटटट मममम))(cid:26)(cid:26)))(cid:26)(cid:26) 3 छबरा टीपीपी ए0स ट8शन U3,4 राज.थ ान आरआरवीयूएनएल एस कोयला 500 4 रामगढ़ सीसीजीटी राज.थ ान आरआरवीयूएनएल एस गैस 160 5 जिFलपा कपूद+ टीपीपी U 5-6 राज.थ ान राज वे.ट पावर िलिमटेड पी िल\न ाइट 270 उउउउपपपप जजजजोोोोड़ड़ड़ड़((((ररररााााजजजज1111थथ थथ ाााानननन)))) 2222999933330000 1 भ.म े एचईपी िसI]म गैती इंXा./ 0च र िलिमटेड पी हाइ(cid:11)ो 51 2 जोरेथांग लूप एचईपी िसI]म डीएएनएस (cid:4)ाइवेटिलिमटेड पी हाइ(cid:11)ो 96 3 रंिगत -IV एचईपी िसI]म जलपावर कारपोरेशन िलिमटेड पी हाइ(cid:11)ो 120 4 ित.त ा -VI एचईपी िसI]म लBको एनज+ (cid:4)ाइवेटिलिमटेड पी हाइ(cid:11)ो 500 5 ित.त ा -III एचईपी िसI]म ित.त ा ऊजा(cid:24) िलिमटेड पी हाइ(cid:11)ो 1200 6 चूजाचेन एचईपी िसI]म गैती इंXा./ 0च र िलिमटेड पी हाइ(cid:11)ो 99 उउउउपपपप जजजजोोोोड़ड़ड़ड़((((ििििसससस%%%%3333मममम)))) 2222000066666666 1 कुडनकुलम U 1,2 तिमलनाडु एनपीसी सी 4य ूि0लयर 2000 2 पीएफबीआर(कलप0क म) तिमलनाडु एनपीसी सी 4य ूि0लयर 500 3 वेFल ुर(ए4न ोर) टीपीपी U 2,3 तिमलनाडु एनटीपीसी/टीएनईबी जेवी सी कोयला 1000 4 तूतीकोरीन टीपीपी जेवी U1,2 तिमलनाडु एनपीटीएल (एनएलसी जेवी) सी कोयला 1000 5 नेवेली II टीपीपी U2 तिमलनाडु एनएलसी सी िल\न ाइट 250 6 भवानी बराज एचईपी II & III तिमलनाडु टीएनईबी एस हाइ(cid:11)ो 60 7 मेYटुर टीपीपी ए0स ट8शन U1 तिमलनाडु टीएनईबी एस कोयला 600 8 नॉथ(cid:24) चे4न ई टीपीपी ए0स ट8शन U1,2 तिमलनाडु टीएनईबी एस कोयला 1200 तिमलनाडु इंड बराथ पावर (मKास) 9 इंड बराथ टीपीपी U1 पी कोयला 660 िलिमटेड उउउउपपपप जजजजोोोोड़ड़ड़ड़((((ततततििििममममललललननननााााडडडडुुुु)))) 7777222277770000 1 िZपुरा सीसीजीटी िZपुरा ओएनजीसी जेवी सी गैस 726.6 2 मोनाच(cid:24)क सीसीजीटी िZपुरा नीपको सी गैस 101 उउउउपपपप जजजजोोोोड़ड़ड़ड़((((िििि(cid:22)(cid:22)(cid:22)(cid:22)पपपपुरुरुरुराााा)))) 888822227777....6666 1 Eरहदं टीपीपी-III U 5,6 उ?त र (cid:4)देश एनटीपीसी सी कोयला 1000 2 अनपारा-डी टीपीपी U 1,2 उ?त र (cid:4)देश यूपीआरवीयूएनएल एस कोयला 1000 3 परी)ाटीपीपी ए0स ट8शन U-5,6 उ?त र (cid:4)देश यूपीआरवीयूएनएल एस कोयला 500 4 हरदआु गंज टीपीपी ए0स ट8शन U-9 उ?त र (cid:4)देश यूपीआरवीयूएनएल एस कोयला 250 (cid:4)यागराजपावर जेनको िलिमटेड 5 बारा टीपीपी U1-3 उ?त र (cid:4)देश पी कोयला 1980 (जेपी Nुप) उउउउपपपप जजजजोोोोड़ड़ड़ड़((((उउउउ####तत तत रररर (cid:25)(cid:25)(cid:25)(cid:25)ददददेशेशेशेश)))) 4444777733330000 1 तपोवन िव$ण ुगढ़ एचईपी उ?त राखंड एनटीपीसी सी हाइ(cid:11)ो 520 एल एAड टी उ?त रांचल हाइ(cid:11)ो 2 (cid:17)सगोली भटवारी एचईपी उ?त राखंड पी हाइ(cid:11)ो 99 पावर िलिमटेड 3 फटा िवयुंग एचईपी उ?त राखंड लBको एनज+ (cid:4)ाइवेट िलिमटेड. पी हाइ(cid:11)ो 76 4 (cid:27)ीनगर एचईपी उ?त राखंड एएचपीको िलिमटेड पी हाइ(cid:11)ो 330 उउउउपपपप जजजजोोोोड़ड़ड़ड़((((उउउउ####तत तत ररररााााखखखखडडंंडडंं )))) 1111000022225555¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 161 (cid:21)(cid:21)(cid:21)(cid:21)ममममतततताााा (cid:1)(cid:1)(cid:1)(cid:1)ममममााााककंंककंं पपपप(cid:7)(cid:7)(cid:7)(cid:7)ररररययययोोोोजजजजननननाााा ककककेेेे ननननाााामममम रररराााा(cid:15)(cid:15)(cid:15)(cid:15)यय यय ििििववववककककााााससससककककतततताााा (cid:20)(cid:20) (cid:20)(cid:20) (cid:21)(cid:21)(cid:21)(cid:21)(cid:22)(cid:22)ेे(cid:22)(cid:22)ेे (cid:23)(cid:23)(cid:23)(cid:23)धधधधनननन (cid:25)(cid:25)(cid:25)(cid:25)ककककाााारररर ((((ममममेगेगेगेगााााववववााााटटटट मममम))(cid:26)(cid:26)))(cid:26)(cid:26) 1 ित.त ा लो डैम-III एचईपी प. बंगाल एनएचपीसी सी हाइ(cid:11)ो 132 2 ित.त ा लो डैम -IV एचईपी प. बंगाल एनएचपीसी सी हाइ(cid:11)ो 160 3 रघुनाथपुर टीपीपी U1,2 प. बंगाल डीवीसी सी कोयला 1200 4 हिFदयाटीपीपी U1-2 प. बंगाल सीईएससी पी कोयला 600 उउउउपपपप जजजजोोोोड़ड़ड़ड़ ((((पपपप.... बबबबंगंगंगंगाााालललल)))) 2222000099992222 TTTTOOOOTTTTAAAALLLL 88888888555533337777 सी: मUय )ेZ; एस: राQय )ेZ; पी: िनजी )ेZ अअअअननननबबुुबबुु धधंंधधंं 6666....2222 ऐऐऐऐससससीीीी अअअअिििितततत////रररर0000तत तत ििििननननममममााााणण(cid:22)(cid:22)णण(cid:22)(cid:22) ााााधधधधीीीीनननन पपपप////ररररययययोोोोजजजजननननाााा ककककाााा ससससााााररररााााशशंंशशंं ििििजजजजननननककककाााा ललललााााभभभभ 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन (cid:1)(cid:1)(cid:1)(cid:1)ाााा7777तत तत हहहहोोोो ससससककककतततताााा हहहह ैै ैै थथथथममममलल(cid:20)(cid:20)लल(cid:20)(cid:20) ििििववववववववररररणणणण हहहहााााइइइइ7777ोोोो गैस/ ककककुुुुलललल थथथथममममलल(cid:20)(cid:20)लल(cid:20)(cid:20) 8888यय यय ििूूििूू9999ललललययययरररर जजजजोोोोड़ड़ड़ड़ कोयला िल\न ाइट एलएनजी मममम<<<<यय यय (cid:28)(cid:28)(cid:28)(cid:28),,ेे,,ेे 2222000000000000 0 0.0 555500000000 0000 2222555500000000 रररराााा====यय यय (cid:28)(cid:28)(cid:28)(cid:28),,ेे,,ेे 88880000 4520 0 0.0 4444555522220000 0000 4444666600000000 ििििननननजजजजीीीी (cid:28)(cid:28)(cid:28)(cid:28),,ेे,,ेे 333355555555 28080 770 0.0 22228888888855550000 0000 22229999222200005555 अअअअििििखखखखलललल भभभभााााररररतततत 2222444433335555 33100 770 0.0 33333333888877770000 0000 33336666333300005555 ::::लल लल ॉॉॉॉकककक आआआआईईईईएएएएममममपपपपीीीी ससससीीीीआआआआईईईईएएएएलललल ::::लल लल ॉॉॉॉकककक ववववााााशशशशररररीीीी (cid:7)(cid:7)(cid:7)(cid:7)ररररजजजज99ेे99ेे टट टट आआआआवववव----यय यय कककक ससससंपंपंपंपकककक(cid:20)(cid:20)(cid:20)(cid:20) जजजजोोोोड़ड़ड़ड़ ((((टटटटीीीीएएएएलललल)))) ((((ककककोोोोययययललललाााा)))) ककककोोोोययययललललाााा आआआआधधधधाााा(cid:17)(cid:17)(cid:17)(cid:17)ररररतततत 4250 16250 660 11880 60 0 33333333111100000000 (cid:28)(cid:28)(cid:28)(cid:28)ममममतततताााा (cid:23)(cid:23)(cid:23)(cid:23)धधधधनननन (cid:21)(cid:21)(cid:21)(cid:21)ममममतततताााा ((((ममममेगेगेगेगााााववववााााटटटट (cid:1)(cid:1)(cid:1)(cid:1)ममममााााककंंककंं पपपप(cid:7)(cid:7)(cid:7)(cid:7)ररररययययोोोोजजजजननननाााा ककककेेेे ननननाााामममम रररराााा(cid:15)(cid:15)(cid:15)(cid:15)यय यय ििििववववककककााााससससककककतततताााा (cid:20)(cid:20) (cid:20)(cid:20) (cid:21)(cid:21)(cid:21)(cid:21)(cid:22)(cid:22)ेे(cid:22)(cid:22)ेे (cid:25)(cid:25)(cid:25)(cid:25)ककककाााारररर मममम(cid:26)(cid:26)))(cid:26)(cid:26))) 1 ककEटया टीपीपी एसटी -II U1 आं(cid:3)(cid:4)देश एपीजेनको एस कोयला 600 2 िस(ह ापुरी टीपीपी पीएच-I, U3,4 आं(cid:3)(cid:4)देश िस(ह ापुरी एनज+ (cid:4)ाइवेट िलिमटेड., पी कोयला 300 उउउउपपपप जजजजोोोोड़ड़ड़ड़((((आं(cid:3)(cid:4)देश)))) 999900000000 1 सुबांिसरी (एल) एचईपी अ7. (cid:4). एनएचपीसी सी हाइ(cid:11)ो 1000 उउउउपपपप जजजजोोोोड़ड़ड़ड़((((अअअअ>>>>.... (cid:25)(cid:25)(cid:25)(cid:25)....)))) 1111000000000000 1 अकलतारा टीपीपी U-4-6 छ?त ीसगढ़ केएसके महानदी पावर कंपनी िलिमटेड पी कोयला 1800 2 रायखेड़ा टीपीपी U-1,2 छ?त ीसगढ़ जीएमआर एनज+ पी कोयला 1370 3 उच(cid:17)पडा टीपीपी U4 छ?त ीसगढ़ आर.के.एम. पावरजेन (cid:4)ाइवेट िलिमटेड, पी कोयला 360 4 एथेना (cid:17)सघतराइ टीपीपी U-2 छ?त ीसगढ़ एथेना छ?त ीसगढ़ पावर िलिमटेड पी कोयला 600162 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] (cid:23)(cid:23)(cid:23)(cid:23)धधधधनननन (cid:21)(cid:21)(cid:21)(cid:21)ममममतततताााा ((((ममममेगेगेगेगााााववववााााटटटट (cid:1)(cid:1)(cid:1)(cid:1)ममममााााककंंककंं पपपप(cid:7)(cid:7)(cid:7)(cid:7)ररररययययोोोोजजजजननननाााा ककककेेेे ननननाााामममम रररराााा(cid:15)(cid:15)(cid:15)(cid:15)यय यय ििििववववककककााााससससककककतततताााा (cid:20)(cid:20) (cid:20)(cid:20) (cid:21)(cid:21)(cid:21)(cid:21)(cid:22)(cid:22)ेे(cid:22)(cid:22)ेे (cid:25)(cid:25)(cid:25)(cid:25)ककककाााारररर मममम(cid:26)(cid:26)))(cid:26)(cid:26))) 5 (cid:17)वजकोट(दर(cid:24)मपुरा) टीपीपी U4 छ?त ीसगढ़ एस के एस इ.प ात एंड पावर िलिमटेड पी कोयला 300 6 वीसा टीपीपी छ?त ीसगढ़ वीसा पावर पी कोयला 600 7 रायगढ़ टीपीपी U3,4 छ?त ीसगढ़ (cid:17)जदल पावर िलिमटेड पी कोयला 1200 उउउउपपपप जजजजोोोोड़ड़ड़ड़((((CCCChhhhhhhhhhhhaaaattttttttiiiissssggggaaaarrrrhhhh)))) 6666222233330000 1 िस0क ा टीपीपी U-4 गुजरात जीएसईसीएल एस कोयला 250 2 मुंKा यूएमपीपी, U -3,4,5 गुजरात Iद टाटा पावर कंपनी िलिमटेड पी कोयला 2400 3 भावनगर िल\न ाइट U-1,2 गुजरात भावनगर एनज+ पी िल\न ाइट 500 उउउउपपपप जजजजोोोोड़ड़ड़ड़((((गगगगजजुुजजुु रररराााातततत)))) 3333111155550000 1 ए.स ार तोरी टीपीपी U-1,2 झारखंड ए.स ार पावर पी कोयला 1200 जेएस इंXा./ 0च र एAड पावर (cid:4)ाइवेट 2 जेएएस इंXा टीपीपी झारखंड पी कोयला 660 िलिमटेड 3 कारपोरेट पावर टीपीपी पीएच-II झारखंड कारपोरेट पावर िलिमटेड पी कोयला 540 उउउउपपपप जजजजोोोोड़ड़ड़ड़((((झझझझााााररररखखखखडडंंडडंं )))) 2222444400000000 1 चंKपुर टीपीपी U-9 महारा$/ एमएएचजेनको एस कोयला 500 2 कोराडी टीपीपी U-9,10 महारा$/ एमएएचजेनको एस कोयला 1320 वाटर EरसोसTज िडपाट(cid:24)म8ट (गवन(cid:24)म8ट ऑफ एस 3 कोयना ले<ट बBक पीएसएस महारा$/ हाइ(cid:11)ो 80 महारा$/ ) इंिडया बुFस - अमरावती टीपीपी पीएच-II, 4 महारा$/ इंिडया बुFस Eरयलटेक िलिमटेड पी कोयला 1350 U1-5 इंिडया बुFस - नािसक टीपीपी पीएच-II, 5 महारा$/ इंिडया बुFस Eरयलटेक िलिमटेड पी कोयला 1350 U1-5 6 ितरोदा टीपीपी पीएच-II U 2,3 महारा$/ अदानी पावर िलिमटेड पी कोयला 1320 उउउउपपपप जजजजोोोोड़ड़ड़ड़((((ममममहहहहाााारररराााा////00 00 )))) 5555999922220000 1 (cid:17)वUय ाचल एसटीपीपी एसटी-वी U-13 मUय (cid:4)देश एनटीपीसी सी कोयला 500 2 महान टीपीपी U-1,2 मUय (cid:4)देश ए.स ार पावर पी कोयला 1200 3 ससान यूएमपीपी U3-6 मUय (cid:4)देश Eरलायंस पावर िलिमटेड पी कोयला 2640 4 नाइNी टीपीपी U-1,2 मUय (cid:4)देश जेपी Nुप पी कोयला 1320 उउउउपपपप जजजजोोोोड़ड़ड़ड़((((मममम....यय यय (cid:25)(cid:25)(cid:25)(cid:25)ददददेशेशेशेश)))) 5555666666660000 1 देरांग टीपीपी U2 उड़ीसा (cid:17)जदल इंिडया थम(cid:24)ल पावर िलिमटेड पी कोयला 600 2 मो4न ेट माली‘aाणीU1,2 उड़ीसा मो4न ेट पी कोयला 1050 के.वी.के. नीलांचल पावर (cid:4)ाइवेट 3 के.वी.के. नीलांचल टीपीपी U 2,3 उड़ीसा पी कोयला 700 िलिमटेड. 4 मL दगु ा(cid:24)टीपीपी उड़ीसा मL दगु ा(cid:24) थम(cid:24)ल पावर को िलिमटेड पी कोयला 60 5 लBको बबांध – ढेनकनाल टीपीपी U-2 उड़ीसा लBको बबांध पी कोयला 660 उउउउपपपप जजजजोोोोड़ड़ड़ड़((((उउउउड़ड़ड़ड़ीीीीससससाााा)))) 3333000077770000 1 कवई टीपीपी राज.थ ान अदानी पावर िलिमटेड पी कोयला 1320 2 जिलपा िल\न ाइट U 7-8 राज.थ ान राज वे.ट पावर िलिमटेड पी िल\न ाइट 270 3 काली(cid:17)सध टीपीएस U2 राज.थ ान आरआरवीयूएनएल एस कोयला 600 उउउउपपपप जजजजोोोोड़ड़ड़ड़((((RRRRaaaajjjjsssstttthhhhaaaannnn)))) 2222111199990000¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 163 (cid:23)(cid:23)(cid:23)(cid:23)धधधधनननन (cid:21)(cid:21)(cid:21)(cid:21)ममममतततताााा ((((ममममेगेगेगेगााााववववााााटटटट (cid:1)(cid:1)(cid:1)(cid:1)ममममााााककंंककंं पपपप(cid:7)(cid:7)(cid:7)(cid:7)ररररययययोोोोजजजजननननाााा ककककेेेे ननननाााामममम रररराााा(cid:15)(cid:15)(cid:15)(cid:15)यय यय ििििववववककककााााससससककककतततताााा (cid:20)(cid:20) (cid:20)(cid:20) (cid:21)(cid:21)(cid:21)(cid:21)(cid:22)(cid:22)ेे(cid:22)(cid:22)ेे (cid:25)(cid:25)(cid:25)(cid:25)ककककाााारररर मममम(cid:26)(cid:26)))(cid:26)(cid:26))) 1 तिस(cid:17)डग एचईपी िसI]म िसगा एनज+ पी हाइ(cid:11)ो 97 2 िडकचु एचईपी िसI]म .न ेहा काइनेEटक पावर पी हाइ(cid:11)ो 96 3 रंिगत -II एचईपी िसI]म िसI]म हाइ(cid:11)ो पावर पी हाइ(cid:11)ो 66 4 र:गिनचु एचईपी िसI]म भारत पावर कारपोरेशन िलिमटेड पी हाइ(cid:11)ो 96 उउउउपपपप जजजजोोोोड़ड़ड़ड़((((ििििसससस%%%%3333मममम)))) 333355555555 मुEटयारा टीपीपी, तुतीकोEरन, मेलाम;थुर 1 तिमलनाडु को.ट ल एनजTन (cid:4)ाइवेट िलिमटेड पी कोयला 1200 U1-2 उउउउपपपप जजजजोोोोड़ड़ड़ड़((((ततततििििममममललललननननााााडडडडुुुु)))) 1111222200000000 उ?? र 1 बजाज एनज+टीपीपी (लिलतपुर) बजाज एनज+ (cid:4)ाइवेट िलिमटेड. पी कोयला 1980 (cid:4)देश उउउउपपपप जजजजोोोोड़ड़ड़ड़((((उउउउ####तत तत रररर (cid:25)(cid:25)(cid:25)(cid:25)ददददेशेशेशेश)))) 1111999988880000 1 टेहरी पीएसपी उ?त राखंड टीएचडीसी C हाइ(cid:11)ो 1000 उउउउपपपप जजजजोोोोड़ड़ड़ड़((((उउउउ####तत तत ररररााााखखखखडडंंडडंं )))) 1111000000000000 1 डीपीएल टीपीपी U 8 प. बंगाल दगु ा(cid:24)पुर (cid:4)ोजे0Y स िलिमटेड एस कोयला 250 2 सागbदघी टीपीपी U1,2 प. बंगाल डJF य ूबीपीडीसीएल एस कोयला 1000 उउउउपपपप जजजजोोोोड़ड़ड़ड़((((पपपप.... बबबबगगंंगगंं ाााालललल)))) 1111222255550000 ककककुुुुलललल 33336666333300005555 अअअअननननबबुुबबुु धधंंधधंं 6666....3333 ििििवववव(cid:2)(cid:2)(cid:2)(cid:2)तत तत ततृृततृृ ििििननननििििववववददददाााा (cid:1)(cid:1)(cid:1)(cid:1)3333````ययययाााा ककककेेेे अअअअधधधधीीीीनननन (cid:1)(cid:1)(cid:1)(cid:1)(cid:2)(cid:2)(cid:2)(cid:2)तत तत ााााििििववववतततत पपपप////ररररययययोोोोजजजजननननाााा???? कककक1111 ससससचचूूचचूू ीीीी ययययििूूििूूननननटटटट XXXX (cid:23)(cid:23)(cid:23)(cid:23)धधधधनननन (cid:21)(cid:21)(cid:21)(cid:21)ममममतततताााा ((((ममममेगेगेगेगााााववववााााटटटट (cid:1)(cid:1)(cid:1)(cid:1)ममममााााककंंककंं पपपप(cid:7)(cid:7)(cid:7)(cid:7)ररररययययोोोोजजजजननननाााा ककककेेेे ननननाााामममम रररराााा(cid:15)(cid:15)(cid:15)(cid:15)यय यय ििििववववककककााााससससककककतततताााा (cid:20)(cid:20) (cid:20)(cid:20) (cid:21)(cid:21)(cid:21)(cid:21)(cid:22)(cid:22)ेे(cid:22)(cid:22)ेे (cid:21)(cid:21)(cid:21)(cid:21)ममममाााातततत((((ममममेगेगेगेगााााववववााााटटटट मममम))(cid:26)(cid:26)))(cid:26)(cid:26) (cid:25)(cid:25)(cid:25)(cid:25)ककककाााारररर मममम(cid:26)(cid:26)))(cid:26)(cid:26))) एनटीपीसी सी 1 4य ू नबीनगर टीपीपी 3x660 िबहार कोयला 1980 जेवी 2 लारा टीपीपी 2x800 छ?त ीसगढ़ एनटीपीसी सी कोयला 1600 3 कुडगी टीपीपी 3x800 कना(cid:24)टक एनटीपीसी सी कोयला 2400 4 सोलापुर टीपीपी 2x660 महारा$/ एनटीपीसी सी कोयला 1320 5 मौदा पीएच-II टीपीपी 2x660 महारा$/ एनटीपीसी सी कोयला 1320 6 गजमारा टीपीपी 2x800 उड़ीसा एनटीपीसी सी कोयला 1600 7 दल+पाली टीपीपी 2x800 उड़ीसा एनटीपीसी सी कोयला 1600 8 उ?त र एनटीपीसी सी मेजा जेवी टीपीपी 2x660 कोयला 1320 (cid:4)देश जेवी 9 रघुनाथपुर टीपीपी 2x660 प. बंगाल डीवीसी सी कोयला 1320 ककककुुुुलललल 11114444444466660000164 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] अअअअननननबबुुबबुु धधंंधधंं 6666....4444 ऐऐऐऐससससीीीी पपपप////ररररययययोोोोजजजजननननाााा???? कककक1111 ससससचचूूचचूू ीीीी ििििजजजजननननककककेेेे ममममPPुुPPुु यय यय 7777लल लल ााााटटंंटटंं ककककेेेे ििििललललएएएए आआआआददददशशेेशशेे (cid:1)(cid:1)(cid:1)(cid:1)(cid:2)(cid:2)(cid:2)(cid:2)तत तत ततुुततुु ककककरररर 3333ददददएएएए गगगगएएएए हहहह ddddपपपपररररंंंंतततत ुु ुुककककुुुुछछछछ (cid:2)(cid:2)(cid:2)(cid:2)वव वव ीीीीककककृृृृििििततततयययय'''' कककक1111 (cid:1)(cid:1)(cid:1)(cid:1)ततततीीीी(cid:26)(cid:26)(cid:26)(cid:26)ाााा हहहह ैैैै (cid:23)(cid:23)(cid:23)(cid:23)धधधधनननन (cid:1)(cid:1)(cid:1)(cid:1)ममममााााककंंककंं पपपप(cid:7)(cid:7)(cid:7)(cid:7)ररररययययोोोोजजजजननननाााा ककककेेेे ननननाााामममम रररराााा(cid:15)(cid:15)(cid:15)(cid:15)यय यय ििििववववककककााााससससककककतततताााा (cid:20)(cid:20) (cid:20)(cid:20) (cid:21)(cid:21)(cid:21)(cid:21)(cid:22)(cid:22)ेे(cid:22)(cid:22)ेे (cid:21)(cid:21)(cid:21)(cid:21)ममममतततताााा ((((ममममेगेगेगेगााााववववााााटटटट मममम))(cid:26)(cid:26)))(cid:26)(cid:26) (cid:25)(cid:25)(cid:25)(cid:25)ककककाााारररर 1 कृ$ण प&णम यूएमपीपी U1-6 आं(cid:3)(cid:4)देश Eरलायंस पावर िलिमटेड पी कोयला 3960 2 बरौनी टीपीपी िबहार बीएसईबी एस कोयला 500 रायगढ़ टीपीपी 3 छ?त ीसगढ़ वीसा पावर पी कोयला 1260 (600मेगावाट+660मेगावाट) 4 अवंथा भंडार टीपीपी U-2 छतत ् ीसगढ़ कोरबा वे.ट पावर कंपनी िलिमटेड पी कोयला 600 5 पीपावव टीपीपी गुजरात िपपावव एनज+ िलिमटेड पी कोयला 600 आरपीसीएल (जेवी ऑफ केपीसीएल 6 येरम7स टीपीपी कना(cid:24)टक एस कोयला 1600 एAड भेल) आरपीसीएल (जेवी ऑफ केपीसीएल एस 7 एदलापुर टीपीपी कना(cid:24)टक कोयला 800 एAड भेल) 8 बेFल ारी टीपीपी U-3 कना(cid:24)टक केपीसीएल एस कोयला 700 मUय 9 डीबी पावर टीपीपी (सीधी) U-2 डीबी पावर पी कोयला 660 (cid:4)देश नवभारत पावर (cid:4)ाइवेट िलिमटेड टीपीपी नवभारत पावर 10 उड़ीसा पी कोयला 1050 U1-3 (cid:4)ाइवेट िलिमटेड संगम पावर जेनरेशन कंपनी िलिमटेड 11 कच(cid:24)ना टीपीपी उ?त र (cid:4)देश पी कोयला 1320 (जेपी Nुप) ककककुुुुलललल 11113333000055550000 अअअअननननबबुुबबुु धधंंधधंं 6666....5555 ऐऐऐऐससससीीीी पपपप////ररररययययोोोोजजजजननननााााएएएए ंं ंंििििजजजजननननककककेेेे ििििललललएएएए ककककोोोोययययललललाााा आआआआपपपपvvूूvvूू तततत हहहहततेेततेे ुु ुुककककरररराााारररर ककककरररर ििििललललययययाााा गगगगययययाााा हहहह ैै ैैपपपपररररंंंंतततत ुुुुउउउउननननककककेेेे ममममPPुुPPुु यय यय 7777लल लल ाााांंटटंंटट ककककेेेे ििििललललएएएए आआआआददददशशशशेेेे (cid:1)(cid:1)(cid:1)(cid:1)(cid:2)(cid:2)(cid:2)(cid:2)तत तत ततुुततुु ननननहहहह(cid:7)(cid:7)(cid:7)(cid:7) 3333ककककएएएए गगगगएएएए हहहह dddd (cid:1)(cid:1)(cid:1)(cid:1)ममममााााककंंककंं पपपप(cid:7)(cid:7)(cid:7)(cid:7)ररररययययोोोोजजजजननननाााा ककककेेेे ननननाााामममम रररराााा(cid:15)(cid:15)(cid:15)(cid:15)यय यय (cid:21)(cid:21)(cid:21)(cid:21)(cid:22)(cid:22)ेे(cid:22)(cid:22)ेे (cid:23)(cid:23)(cid:23)(cid:23)धधधधनननन (cid:25)(cid:25)(cid:25)(cid:25)ककककाााारररर (cid:21)(cid:21)(cid:21)(cid:21)ममममतततताााा ((((ममममेगेगेगेगााााववववााााटटटट मममम))(cid:26)(cid:26)))(cid:26)(cid:26) 1 बीपीएल पावर (cid:4)ोजे0Y स (एपी) िलिमटेड आं(cid:3)(cid:4)देश पी कोयला 600 2 टीपीपी ऑफ मेसस(cid:24) वीिडयोकॉन इंड./ ीज िलिमटेड. छ?त ीसगढ़ पी कोयला 660 3 धी; पावर जेन (cid:4)ाइवेट िलिमटेड छ?त ीसगढ़ पी कोयला 1050 4 पीईएल पावर िलिमटेड अमरेली गुजरात पी कोयला 500 5 ितलैया यूएमपीपी बाइ Eरलायंस पावर िलिमटेड झारखंड पी कोयला 3960 6 अपणा(cid:24) इंXा एनज+ महारा$/ पी कोयला 250 जीआईएनबीएचयूवीआईएसजी पावर जेनरेशन िलिमटेड 7 महारा$/ पी कोयला 500 2X250 8 स8/ल इंिडया पावर को. िलिमटेड महारा$/ पी कोयला 660 9 गुVत ा एनज+ िलिमटेड. महारा$/ पी कोयला 540 10 एनएसएल पावर (cid:4)ाइवेट िलिमटेड तिमलनाडु पी कोयला 1320 11 ित;मलाइ टीपीपी पीइएल पावर िलिमटेड तिमलनाडु पी कोयला 500 12 ओबीआरए इए0स टीएन U-1 (यूपीआरयूवीएनएल) उ?त र (cid:4)देश एस कोयला 660 ककककुुुुलललल 11111111222200000000¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 165 अअअअननननबबुुबबुु धधंंधधंं 6666....6666 ििििननननममममााााणण(cid:22)(cid:22)णण(cid:22)(cid:22) ााााधधधधीीीीनननन गगगगससैैससैै आआआआधधधधाााा////ररररतततत पपपप////ररररययययोोोोजजजजननननाााा???? कककक1111 ससससचचूूचचूू ीीीी ((((ििििजजजजननननककककेेेे ििििललललएएएए गगगगससैैससैै आआआआपपपपvvूूvvूू तततत हहहहततेेततेे ुुुुTTTTयय यय वववव(cid:2)(cid:2)(cid:2)(cid:2)थथ थथ ाााा ननननहहहह(cid:7)(cid:7)(cid:7)(cid:7) हहहहोोोो पपपपााााययययीीीी हहहह))ैै))ैै (cid:1)(cid:1)(cid:1)(cid:1)ममममााााककंंककंं पपपपााााववववरररर 1111टट टट ेेशशेेशशनननन////एएएएजजजजसस(cid:26)(cid:26)सस(cid:26)(cid:26) ीीीी ककककाााा ननननाााामममम (cid:21)(cid:21)(cid:21)(cid:21)ममममतततताााा रररराााा(cid:15)(cid:15)(cid:15)(cid:15)यय यय मममम (cid:26)(cid:26) (cid:26)(cid:26)िििि1111थथथथतततत ((((ममममेगेगेगेगााााववववााााटटटट मममम))(cid:26)(cid:26)))(cid:26)(cid:26) मममम....यय यय (cid:21)(cid:21)(cid:21)(cid:21)(cid:22)(cid:22)ेे(cid:22)(cid:22)ेे रररराााा(cid:15)(cid:15)(cid:15)(cid:15)यय यय (cid:21)(cid:21)(cid:21)(cid:21)(cid:22)(cid:22)ेे(cid:22)(cid:22)ेे 1 बवाना सीसीजीटी * 750 IदFल ी 2 धुcन ए0स ट8शन (जीएसईसीएल) 375 गुजरात 3 पीपावव जेवी सीसीजीटी 702 गुजरात उउउउपपपप जजजजोोोोड़ड़ड़ड़((((एएएएसससस....एएएएसससस....)))) 1111888822227777 ििििननननजजजजीीीी (cid:21)(cid:21)(cid:21)(cid:21)(cid:22)(cid:22)ेे(cid:22)(cid:22)ेे 4 वेमािगरी इए0स पी वाई जीआरईएल 768 आं(cid:3)(cid:4)देश 5 लBको क:डापFल ी इए0स पी (एसटी- III) 770 आं(cid:3)(cid:4)देश 6 काशीपुर सीसीजीटी (dावंती एनज+ पी िलिमटेड) I&II 450 उ?त राखंड 7 सामलकोट ए0स पBसन 2400 आं(cid:3)(cid:4)देश 8 गेग7पाडु ईए0स पी (एसटी-III)I 400 आं(cid:3)(cid:4)देश 9 गौतमी एसटी-II (फेज-I) 800 आं(cid:3)(cid:4)देश 10 सीसीजीटी वाइ मेसस(cid:24) पीएसपीएल(पांडुरंगा) –पीएच-I 110 आं(cid:3)(cid:4)देश 11 आरवीके(राजमुंKी)(cid:4)ाइवेट िलिमटेड 436 आं(cid:3)(cid:4)देश 12 सुजेन फेज-1 यूिनट-4 मेसस(cid:24) टोर8ट 382.5 गुजरात 13 दहजे एसईजेड (टोर8ट) 3 मॉeूFस 1200 गुजरात 14 सीसीजीटी वाइ मेसस(cid:24) बीटा इंXाटेक (cid:4)ाइवेट िलिमटेड 225 उ?त राखंड 15 सीसीजीटी वाइ मेसस(cid:24) गामा इंXाटेक (cid:4)ाइवेट (cid:4)ाइवेट िलिमटेड 225 उ?त राखंड 16 सीसीपीपी वाइ मेसस(cid:24) गु7जी पावर (cid:4)ाइवेट िलिमटेड (जीपीपीएल) 110 उ?त राखंड 17 सीएचपी एट िबदार वाइ सहले ी ए0स पोYस(cid:24) (cid:4)ाइवेट िलिमटेड 70 कना(cid:24)टक 18 सीसीजीटी एट कु&लम वाइ सहले ी ए0स पोYस(cid:24) पी िलिमटेड 30 तिमलनाडु 19 लातुर सीसीपीपी वाइ हके ेट पावर िस.ट (स पी िलिमटेड 800 महारा$/ 20 सीसीपीपी वाइ मेसस(cid:24) एच एनज+ को (cid:4)ाइवेट िलिमटेड 350 महारा$/ 21 सीसीजीटी वाइ मेसस(cid:24) केपीआर केिमकFस िलिमटेड 225 आं(cid:3)(cid:4)देश 22 सीसीजीटी वाइ मेसस(cid:24) पायोिनयर गैस पावर िलिमटेड 400 महारा$/ 23 पीपीएन ए0स पBसन वाइ पीपीएन पावर जेनरेशन को िलिमटेड 1080 तिमलनाडु 24 गैस इंजन एट पाशमयलरम वाइ आ.थ ा पावर 35 आं(cid:3)(cid:4)देश उउउउपपपप जजजजोोोोड़ड़ड़ड़((((ििििननननजजजजीीीी (cid:21)(cid:21)(cid:21)(cid:21)(cid:22)(cid:22)ेे(cid:22)(cid:22)ेे )))) 11111111222266666666....5555 ककककुुुुलललल((((एएएएससससएएएएसससस++++पपपपीीीीएएएएसससस)))) 11113333000099993333....5555 ****बबबबववववााााननननाााा ससससीीीीससससीीीीजजजजीीीीटटटटीीीी कककक@@@@ ककककुुुुलललल (cid:21)(cid:21)(cid:21)(cid:21)ममममतततताााा 1111555500000000 ममममगगेेगगेे ााााववववााााटटटट हहहह ैै ैैििििजजजजससससमममम (cid:26)(cid:26) (cid:26)(cid:26)सससस ेे ेे11111111ववववCCCC पपपपचचंंचचंं ववववषषषषEEEEयययय ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन 777755550000 ममममगगेेगगेे ााााववववााााटटटट उउउउपपपपययययोोोोगगगग GGGGआआआआ166 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] अअअअननननबबुुबबुु धधंंधधंं 6666....7777 ऐऐऐऐससससीीीी ििििवववव@@@@ततुुततुु पपपप(cid:17)(cid:17)(cid:17)(cid:17)ररररययययोोोोजजजजननननाााा(cid:22)(cid:22)(cid:22)(cid:22) कककक(cid:24)(cid:24)(cid:24)(cid:24) ससससचचूूचचूू ीीीी ििििजजजज))))हह हह 33 3311112222वववव.... ययययोोोोजजजजननननाााा मममम 33 33शशशशााााििििममममलललल ककककररररनननन ेेेेककककेेेे ििििललललएएएए अअअअननननररुुररुु ोोोोधधधध ककककययययाााा गगगगययययाााा हहहहैैैै (cid:1)(cid:1)(cid:1)(cid:1)ममममााााककंंककंं पपपप(cid:7)(cid:7)(cid:7)(cid:7)ररररययययोोोोजजजजननननाााा ककककेेेे ननननाााामममम रररराााा(cid:15)(cid:15)(cid:15)(cid:15)यय यय ििििववववककककााााससससककककतततताााा (cid:20)(cid:20) (cid:20)(cid:20) (cid:21)(cid:21)(cid:21)(cid:21)(cid:22)(cid:22)ेे(cid:22)(cid:22)ेे (cid:23)(cid:23)(cid:23)(cid:23)धधधधनननन (cid:25)(cid:25)(cid:25)(cid:25)ककककाााारररर (cid:21)(cid:21)(cid:21)(cid:21)ममममतततताााा ((((ममममेगेगेगेगााााववववााााटटटट मममम))(cid:26)(cid:26)))(cid:26)(cid:26) 1 एएएएजजजजीीीीटटटटीीीीपपपपीीीी िििि(cid:22)(cid:22)(cid:22)(cid:22)पपपपुरुरुरुराााा नीपको सी गैस 46 2 जांगीर चंपा टीपीपी छ?त ीसगढ़ एमबी पावर पी कोयला 1320 डीआरटीपीपी ए0स ट8शन 3 हEरयाणा एचपीजीसीएल एस कोयला 660 (यमुना नगर) ि.पक इलेि0/क पावर कारपोशन 4 तुतीकोEरन एसटी-IV तिमलनाडु पी कोयला 525 (cid:4)ाइवेट िलिमटेड 5 (cid:27)ीकाजी टीपीपी तिमलनाडु (cid:17)सिधया पावर पी कोयला 1320 6 भोगनीपुर टीपीपी उ?त र (cid:4)देश लBको पी कोयला 3960 7 संIदला टीपीपी उ?त र (cid:4)देश टोर8ट पावर पी कोयला 1320 8 घाटमपुर टीपीपी उ?त र (cid:4)देश यूपीआरवीयूएनएल एAड एनएलसी जेवी एस कोयला 1980 9 जवाहरपुर टीपीपी उ?त र (cid:4)देश यूपीआरवीयूएनएल एस कोयला 1980 TTTToooottttaaaallll 11113333111111111111 अअअअननननबबुुबबुु धधंंधधंं 6666....8888 ऐऐऐऐससससीीीी जजजजललललििििववववIIIIततुुततुु पपपप////ररररययययोोोोजजजजननननाााा???? कककक1111 ससससचचूूचचूू ीीीी ििििजजजजननननककककाााा ललललााााभभभभ 11113333वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन (cid:1)(cid:1)(cid:1)(cid:1)ाााा7777तततत हहहहोोोोनननन ेेेेकककक1111 आआआआशशशशाााा हहहह ैै ैै (cid:1)(cid:1)(cid:1)(cid:1)ममममााााककंंककंं ययययोोोोजजजजननननाााा ककककाााा ननननाााामममम रररराााा(cid:15)(cid:15)(cid:15)(cid:15)यय यय (cid:21)(cid:21)(cid:21)(cid:21)(cid:22)(cid:22)ेे(cid:22)(cid:22)ेे ििििववववककककााााससससककककतततताााा (cid:20)(cid:20) (cid:20)(cid:20) (cid:21)(cid:21)(cid:21)(cid:21)ममममतततताााा ((((ममममेगेगेगेगााााववववााााटटटट मममम))(cid:26)(cid:26)))(cid:26)(cid:26) 1 डु(म ुगुडेम आं(cid:3)(cid:4)देश एस एपीआइडी 320 2 पोFल ावरम एमपीपी आं(cid:3)(cid:4)देश एस एपीआइडी 960 3 (cid:17)सगारेfीपFल ी आं(cid:3)(cid:4)देश एस एपीआइडी 320 4 तवंग-I अ7. (cid:4). सी एनएचपीसी 600 5 तवंग-II अ7. (cid:4). सी एनएचपीसी 800 6 डेमवे लोअर अ7. (cid:4). पी एथेना डेमवे 1750 केएसके िडिJबन हाइ(cid:11)ो पावर (cid:4)ाइवेट 7 िडिJबन अ7. (cid:4). पी 120 िलिमटेड. 8 िसयांग लोअर अ7. (cid:4). पी जय(cid:4)काश एसोिसएYस िलिमटेड 2700 9 िनयामजुंछु अ7. (cid:4). पी भीलवाड़ा एनज+ िलिमटेड 780 10 ल:डा (ताल:ग) अ7. (cid:4). पी जीएमआर एनज+ िलिमटेड 225 11 नफरा अ7. (cid:4). पी एसइडJF य ू 120 12 टैटो-II अ7. (cid:4). पी Eरलायंस एनज+ िलिमटेड 700 13 दद(cid:24) ु अ7. (cid:4). पी केवीके 60 14 मागो छू अ7. (cid:4). पी एसइडJF य ू 96 15 पार अ7. (cid:4).r पी केवीके 65 16 रेगो अ7. (cid:4).r पी टीयूएफएफ एनज+ 141 17 िडनचBग अ7. (cid:4). पी केएसके 90 18 4य ु0चा रांग छू अ7. (cid:4). पी एसइडJF य ू 96 19 लोवर कोिपिल असम एस असम जेनको 150 20 धौला िसW िह. (cid:4). सी एसजेवीएनएल 66 21 बजोली होली िह. (cid:4). पी जीएमआर 180 22 कुटेहर िह. (cid:4). पी जेएसडJF य ू 240 23 धमवारी सुंदा िह. (cid:4). पी धमवारी पावर (cid:4)ाइवेट िलिमटेड 70¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 167 (cid:1)(cid:1)(cid:1)(cid:1)ममममााााककंंककंं ययययोोोोजजजजननननाााा ककककाााा ननननाााामममम रररराााा(cid:15)(cid:15)(cid:15)(cid:15)यय यय (cid:21)(cid:21)(cid:21)(cid:21)(cid:22)(cid:22)ेे(cid:22)(cid:22)ेे ििििववववककककााााससससककककतततताााा (cid:20)(cid:20) (cid:20)(cid:20) (cid:21)(cid:21)(cid:21)(cid:21)ममममतततताााा ((((ममममेगेगेगेगााााववववााााटटटट मममम))(cid:26)(cid:26)))(cid:26)(cid:26) 24 कशांग–IV िह. (cid:4). एस एचपीपीसीएल 48 25 रेणुका बLध िह. (cid:4). एस एचपीपीसीएल 40 26 शांगटांग करचम िह. (cid:4). एस एचपीपीसीएल 450 27 कवर ज(म ू कRम ीर सी एनएचपीसी 520 28 Iक; ज(म ू कRम ीर सी एनएचपीसी 600 29 4य ू गंडेरवाल ज(म ू कRम ीर एस जेकेपीडीसी 93 30 गुंिडया-I कना(cid:24)टक एस केपीसीएल 200 31 गुंिडया-II कना(cid:24)टक एस केपीसीएल 200 32 िशव समुंKम सीजनल एचईपी कना(cid:24)टक एस केपीसीएल 345 33 अिथरापFल ी केरल एस केएसईबी 163 34 मणकुलम केरल एस केएसईबी 40 35 अचेनकोिवल केरल एस केएसईबी 30 36 पंबार केरल एस केएसईबी 40 37 लोकटक डी/एस मिणपुर सी एनएचपीसी 66 38 बालीमेला डैम टो उड़ीसा एस उड़ीसा एAड एपीजेवी 60 39 यूबीडीसी-III पंजाब पी भीलवाड़ा एनज+ िलिमटेड 75 40 शाहपुर कांडी पंजाब एस पीएसईबी 206 41 ती.त ा -IV िसI]म सी एनएचपीसी 520 42 iटग iटग िसI]म पी टी टी एनज+ 99 43 पानन िसI]म पी िहमिगरी 300 44 कुंदा पीएसएस तिमलनाडु एस टीएनईबी 500 45 लता तपोवन उ?त राखंड सी एनटीपीसी 171 46 िव$ण ुगाड पीपलकोEट उ?त राखंड सी टीएचडीसी 444 47 कोटिलभेल-IA उ?त राखंड सी एनएचपीसी 195 48 कोटिलभेल -IB उ?त राखंड सी एनएचपीसी 320 49 कोटिलभेल -II उ?त राखंड सी एनएचपीसी 530 50 ;पिसयाबागर खिसयाबारा उ?त राखंड सी एनटीपीसी 260 51 नैतवार मोरी (देवरा मोरी) उ?त राखंड सी एसजेवीएनएल 56 52 देवसारी डैम उ?त राखंड सी एसजेवीएनएल 252 53 अलकनंदा (बKीनाथ) उ?त राखंड पी जीएमआर 300 54 हनोल ितउनी उ?त राखंड पी सन<लैग 60 55 बोगुिडयार िसरकरी उ?त राखंड पी जीवीके 146 56 मपांग बोगुिडयार उ?त राखंड पी जीवीके 200 57 पाला मनेरी उ?त राखंड एस यूआईडी 480 58 अरकोट ितउनी उ?त राखंड एस यूआईडी 81 59 ितउनी Vल ासु उ?त राखंड एस यूआईडी 72 60 बोवाला नंद (cid:4)याग उ?त राखंड एस यूजेवीएनएल 300 61 नंद (cid:4)याग लंगासु उ?त राखंड एस यूजेवीएनएल 100 62 तमक लता उ?त राखंड एस यूजेवीएनएल 280 63 रामम -III प. बंगाल सी25 एनटीपीसी 120 64 रामम -I प. बंगाल एस डJF य ूबीपीडीसीएल 36 65 रामम अFट ीमेट-(IV) प. बंगाल एस डJF य ूबीपीडीसीएल 28 जजजजोोोोड़ड़ड़ड़ 11119999666677775555168 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] अअअअ((((यय यय ाााायययय 7777 थथथथममममलल(cid:22)(cid:22)लल(cid:22)(cid:22) पपपपााााववववरररर 7777लल लल ााााटटंंटटंं '''' ककककेेेे ििििललललएएएए भभभभििूूििूू मममम औऔऔऔरररर जजजजलललल कककक1111 आआआआववववYYYYयय यय ककककतततताााा ककककाााा उउउउपपपपयययय00ुु00ुु तत तत ििििननननधधधधाााारर(cid:22)(cid:22)रर(cid:22)(cid:22) णणणण 7777....0000 (cid:1)(cid:1)(cid:1)(cid:1)(cid:2)(cid:2)(cid:2)(cid:2)तत तत ााााववववननननाााा 12व(cid:7) पंचवष(cid:12)य योजना के दौरान और उसके प)च ात दशे म(cid:17) भारी (cid:18)मता अिभवृि(cid:23) क(cid:25) प3रकjप ना क(cid:25) गई ह।ै 12व(cid:7) पंचवष(cid:12)य योजना के दौरान लगभग 88,000 मेगावाट (cid:18)मता आव)य क ह ै और 13व(cid:7) पंचवष(cid:12)य योजना के दौरान भी लगभग इतनी ही (cid:18)मता अिभवृि(cid:23) क(cid:25) जानी ह।ै इसके िलए ब,त से कोयला और गैस आधा3रत पावर =ल ांट* क(cid:25) 8थ ापना आव)य क होगी। तेजी से (cid:18)मता अिभवृि(cid:23) ल%य * को <ा=त करन े के िलए 660/800 मेगावाट (cid:18)मता वाली सुपर 4B3टकल यूिनट* का <योग करते ,ए 4000 मेगावाट आकार वाले अj" ा पावर मेगा =ल ांट* (यूएमपीपी) सिहत बड़ी (cid:18)मता वाले पावर =ल ांट* क(cid:25) प3रकjप ना क(cid:25) गई ह।ै इनक(cid:25) 8थ ापना िवशेष Nप स े िपटहडे और तटवत(cid:12) 8थ ान* म(cid:17) क(cid:25) जाएगी। 4कसी थम2ल पावर =ल ांट क(cid:25) 8थ ापना के िलए पया2=त माRा म (cid:17) भूिम जल क(cid:25) उपलIध ता महQव पूण2 आव)य कता ह।O तुलनाQम क Nप से (cid:18)मता अिभवृि(cid:23) क(cid:25) गित धीमी होने के कारण पहल े भूिम क(cid:25) उपलIध ता कोई बड़ी बाधा नह(cid:7) थी और पावर =ल ांट* क(cid:25) 8थ ापना अCय लागू मानदडं * अथा2त कोयला और जल क(cid:25) आपूPत के आधार पर क(cid:25) जाती थी। हालां4क, अब चूं4क िव#ुत (cid:18)ेR का िव8त ार Kय ापक पैमाने पर शुN 4कया गया ह,ै अत: भूिम क(cid:25) उपलIध ता भी एक बाधा बनती जा रही ह ै और वत2मान म(cid:17) योजनागत तथा भावी =ल ांट* के िलए यह एक बड़ी चुनौती बनकर उभर रही ह।ै भूिम अब महQव पूण2 संसाधन बन गई ह ै और इसका अिध\हण अCय <ित8प ध(cid:12) (cid:18)ेR* तथा 8थ ानीय जनता के िवरोध के कारण क3ठन होता जा रहा ह।ै इस पृ!ठ भूिम म(cid:17) भूिम के अिधकतम सदपु योग का महQव बढ़ गया ह ै और ऐसे <यास 4कए जा रह े ह O 4क उपलIध भूिम म(cid:17) ही अिधकतम (cid:18)मता वाले =ल ांट* क(cid:25) 8थ ापना क(cid:25) जाए। 7777....1111 भभभभििूूििूू मममम आआआआववववYYYYयय यय ककककतततताााा 4कसी कोयला आधा3रत =ल ांट के िलए भूिम आव)य कता ब,त से घटक* जैसे; =ल ाटं क(cid:25) (cid:18)मता और यूिनट का आकार, कोयले क(cid:25) गुणवQत ा और इसके भंडारण क(cid:25) आव)य कता, अपनाई जाने वाली सीडIj य ू <णाली के <कार, पानी के qोत और इसक(cid:25) भडं ारण आव)य कता तथा =ल ाटं िडजाइन से जुड़ े िविभCन पहलुE पर िनभर2 करती ह।ै कोयला आधा3रत =ल ांट* के िलए भूिम क(cid:25) आव)य कता मुZय Nप से मुZय =ल ांट <णािलय*/उप8क र*, ऐश डाइक, पाइप कॉ3रडोर (ऐश और रॉ वाटर के िलए) और आवासीय प3रसर के िलए होती ह।ै आयाितत कोयले पर आधा3रत =ल ांट* के िलए तुलनाQम क Nप से कम भूिम क(cid:25) आव)य कता होती ह ै dय *4क इसके िलए 8थ ानीय कोयल े पर आधा3रत =ल ांट* क(cid:25) तरह ईएसपी, कोल हडO Jलग <णाली, ऐश हडO Jलग <णाली और ऐश डाइक आ4द के िलए भूिम आव)य क नह(cid:7) होती ह।ै सीडIj य ू <णाली के <कार अथा2त मुdत चB या कूJलग टावर िस8ट म का भी =ल ांट के िलए भूिम आव)य कता पर महQव पूण2 <भाव पड़ता ह।ै ऐश डाइक के िलए भूिम आव)य कता िविभCन पहलुE जैसे कोयल े क(cid:25) गुणवQत ा, ऐश िनपटान क(cid:25) प(cid:23)ित और |लाई ऐश के सदपु योग पर िनभ2र करती ह।ै पहल े |लाई ऐश और बॉटम ऐश को पारंप3रक तरीके स े पतली 8ल री के Nप म(cid:17) ऐश प”ड म(cid:17) िनपटाई जाती थी, इसके िलए बड़ े प”ड क(cid:25) आव)य कता होती थी। हालां4क गीली 8ल री के सांfण म(cid:17) 25% तक क(cid:25) वृि(cid:23) होन े और अCय <ौ#ोिग4कय* जैस े एचसीएसडी (उzच सांfण 8ल री िनपटान) और rाई |लाई ऐश िनपटान का <योग शुN 4कए जाने से ऐश डाइक के िलए भूिम क(cid:25) आव)य कता काफ(cid:25) हद तक कम हो गई ह।ै एक िनधा 32 रत समयाविध के भीतर |लाई ऐश के 100% <गामी सदपु योग के िलए पया2वरण और वन मंRालय के िनदशे ानुसार ऐश डाइक म(cid:17) िनपटान क(cid:25) जाने वाली ऐश क(cid:25) माRा काफ(cid:25) हद तक कम हो गई ह।ै धुले ,ए कोयले के <योग और आयात 4कए गए कोयले को 8व दशे ी कोयले के साथ िमलाकर उसका <योग करने से भी ऐश डाइक के िलए भूिम क(cid:25) आव)य कता कम हो गई ह।ै आयाितत कोयल े पर आधा3रत नए पलांट* के िलए ऐश डाइक हते ु कम से कम भूिम आव)य क होगी।¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 169 7777....1111....1111 भभभभििूूििूू मममम आआआआववववYYYYयय यय ककककतततताााा ककककोोोो अअअअििििधधधधककककततततमममम उउउउपपपपययययु0ु0ु0ु0तत तत बबबबननननाााानननन ेेेेककककेेेे ििििललललएएएए ससससििििममममिििितततत कोयला आधा3रत =ल ांट* पर भारी माRा म(cid:17) <8त ािवत (cid:18)मता अिभवृि(cid:23) िनभ2र होन े क(cid:25) बात को (cid:2)य ान म (cid:17) रखत े ,ए थम2ल =ल ांट* के िलए भूिम आव)य कता के अिधकतम सदपु योग क(cid:25) आव)य कता महसूस क(cid:25) गई। चूं4क उzच (cid:18)मता अिभवृि(cid:23) के ल%य * को <ा=त करने के िलए बड़ े आकार वाली यूिनट* के साथ अिध क (cid:18)मता वाले =ल ांट* क(cid:25) 8थ ापना क(cid:25) जानी ह,ै अत: केCf ीय िव#ुत <ािधकरण न े अ<ैल, 2007 म(cid:17) एक सिमित ग3ठत क(cid:25) थी जो थम2ल =ल ांट* के िलए भूिम आव)य कता संबंधी पहल ू का अ(cid:2)य यन करेगी और िविभCन आकार वाले =ल ांट* के िलए कम स े कम भूिम आव)य कता पर सुझाव दगे ी। इस सिमित ने 4दसंबर, 2007 म(cid:17) अपनी 3रपोट2 <8त ुत क(cid:25) और अपनी 3रपोट2 म(cid:17) िविभCन आकार वाले तथा िमि}त पावर =ल ांट* जैसे 8व दशे ी कोयला/आयाितत कोयला पर आधा3रत, मुdत चB/बंद चB सीडIj य ू <णाली आ4द के िलए भूिम आव)य कता संबंधी िविभCन पहलुE का िव)ल ेषण 4कया। सिमित न े भूिम आव)य कता से संबंिधत िसफा3रश(cid:17) <8त ुत कV जो नीचे तािलका 7.1 और 7.2 म(cid:17) दी गई ह O : ततततााााििििललललककककाााा 7777....1111 (cid:2)(cid:2)(cid:2)(cid:2)वव वव ददददशशशशेेेे ीीीी ककककोोोोययययललललाााा ((((ििििपपपपटटटटहहहहडडेेडडेे (cid:2)(cid:2)(cid:2)(cid:2)टट टट ेेशशेेशशनननन)))) ****....सससस..ंं..ंं ििििववववववववररररणणणण भभभभििूूििूूमममम आआआआवववव(cid:8)(cid:8)(cid:8)(cid:8)यय यय ककककतततताााा ((((एएएएककककड़ड़ड़ड़)))) ((((एएएएककककड़ड़ड़ड़ (cid:13)(cid:13)(cid:13)(cid:13)िििितततत ममममगगेेगगेे ााााववववााााटटटट)))) 2x500 3x660 6x660 5555xxxx888800000000 मेगावाट मेगावाट मेगावाट ममममगगेेगगेे ााााववववााााटटटट iiii)))) मु(cid:3) य पावर (cid:10) लाटं 600 850 1250 1111111177770000 (0.6) (0.43) (0.32) ((((0000....22229999)))) iiiiiiii)))) ऐश डाइक 500 855 1630 1111222200000000 iiiiiiiiiiii)))) अ(cid:14) य सुिवधाएं (पाइप कॉ(cid:18)रडोर एवं रॉ वाटर 220 245 250 222255550000 पंप हाउस आ(cid:25)द) iiiivvvv)))) टाउनिशप 100 100 150 111155550000 कुल भूिम आव(cid:30) यकता (एकड़ म! ) 1420 2050 3280 2222777777770000 ((((एएएएककककड़ड़ड़ड़////ममममगगेेगगेे ााााववववााााटटटट)))) ((((1111....44442222)))) ((((1111....00004444)))) ((((0000....88883333)))) ((((0000....66669999))))170 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ततततााााििििललललककककाााा 7777....2222 आआआआययययाााािििितततततततत ककककोोोोययययललललाााा ((((ततततटटटटववववतततत(cid:12)(cid:12)(cid:12)(cid:12) (cid:2)(cid:2)(cid:2)(cid:2)टट टट ेेशशेेशशनननन)))) (cid:1)(cid:1)(cid:1)(cid:1)....सससस..ंं..ंं ििििववववववववररररणणणण भभभभििूूििूू मममम आआआआवववव(cid:9)(cid:9)(cid:9)(cid:9)यय यय ककककतततताााा ((((एएएएककककड़ड़ड़ड़)))) ((((एएएएककककड़ड़ड़ड़ (cid:14)(cid:14)(cid:14)(cid:14)िििितततत ममममगगेेगगेे ााााववववााााटटटट)))) 3x660 मेगावाट 6x660 मेगावाट 5555xxxx888800000000ममममगगेेगगेे ााााववववााााटटटट एमजीआर एमजीआर एमजीआर एमजीआर एमजीआर एमजीआर और कूJलग और और कूJलग और और कूJलग और टावर के कूJलग टावर के कूJलग टावर के कूJलग िबना टावर के िबना टावर के िबना टावर के साथ साथ साथ iiii)))) मुZय पावर =ल ांट 400 570 630 880 570 888844440000 (0.2) (0.29) (0.16) (0.22) (0.14) ((((0000....22221111)))) iiiiiiii)))) ऐश डाइक 240 240 400 400 390 333399990000 iiiiiiiiiiii)))) अCय सुिवधाए ं 100 140 110 150 110 111155550000 (पाइप कॉ3रडोर एवं रॉ वाटर पंप हाउस आ4द) iiiivvvv)))) टाउनिशप 100 100 150 150 150 111155550000 कुल भूिम 840 1050 1290 1580 1220 1111555533330000 आव)य कता (एकड़ म(cid:17) ) ((((0000....44442222)))) ((((0000....55553333)))) ((((0000....33333333)))) ((((0000....4444)))) ((((0000....3333)))) ((((0000....33338888)))) ((((एएएएककककड़ड़ड़ड़////ममममेगेगेगेगााााववववााााटटटट)))) सिमित ने सुझाव 4दया ह ै 4क ऐश डाइक और आवासीय कालोनी के िलए भूिम आव)य कता को और कम 4कया जा सकता ह।ै |लाई ऐश के सदपु योग, पलांट क(cid:25) छोटी िडजाइन और टाउनिशप के िलए ब,मंिजला इमारत संकjप ना को अपनाकर एक(cid:25)कृत प3रयोजनाE क(cid:25) 8थ ापना स े भूिम आव)य कता को काफ(cid:25) कम 4कया जा सकता ह।ै 7777....2222 थथथथममममलल(cid:22)(cid:22)लल(cid:22)(cid:22) पपपपााााववववरररर 7777लल लल ााााटटंंटटंं '''' मममम $$ $$जजजजलललल आआआआववववYYYYयय यय ककककतततताााा ककककोोोो उउउउपपपपयययय00ुु00ुु तत तत बबबबननननाााानननन ेे ेेववववााााललललीीीी (cid:1)(cid:1)(cid:1)(cid:1)ौौौौIIIIोोोोििििगगगगकककक1111 ((((डडडड;;;;++ ++ यय यय ओओूूओओूू टटटटीीीी)))) 7777....2222....1111 (cid:1)(cid:1)(cid:1)(cid:1)(cid:2)(cid:2)(cid:2)(cid:2)तत तत ााााववववननननाााा थम2ल िव#ुत उQप ादन के िलए पानी एक महQव पूण2 इनपुट ह।ै ऐितहािसक Nप से थमल2 पावर =ल ांट जल िनकाय* के आस पास 8थ ािपत 4कए जात े थ े और उनके िलए 8थ ायी आधार पर पया2=त माRा म(cid:17) जल क(cid:25) उपलIध ता सुिनिcत क(cid:25) जाती थी। दशे म(cid:17) च,मुखी िवकास और थम2ल पावर 8ट ेशन* क(cid:25) Kय ापक वृि(cid:23) के साथ जल क(cid:25) उपलIध ता भी कम होती जा रही ह।ै चूं4क औ#ोिगक उपयोग और िव#ुत उQप ादन क(cid:25) तुलना म(cid:17) पेयजल और Jसचाई के <योग हते ु जल आवंटन को <ाथिमकता दी जाती है, अत: थम2ल पावर =ल ांट* को पया2=त माRा म(cid:17) पानी उपलIध नह(cid:7) हो पा रहा ह।ै थम2ल पावर =ल ांट* म(cid:17) जल का सदपु योग और = लांट से उQस Pजत अपिश!ट जल क(cid:25) 3रसाइकJलग िनतांत महQव पूण2 हो गई ह,ै ता 4क जल के qोत* से कम से कम पानी लेने क(cid:25) आव)य कता पड़।े 12व(cid:7) पंचवष(cid:12)य योजना के दौरान और उसके प)च ात बड़ े पैमाने पर कोयला आधा3रत (cid:18)मता अिभवृि(cid:23) क(cid:25) जानी ह।ै इसके िलए कोयला आधा3रत पावर 8ट ेशन* क(cid:25) 8थ ापना हते ु बड़ी संZय ा म(cid:17) नए 8थ ल आव)य क ह*गे। 8थ ल के¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 171 चयन हते ु भूिम और जल क(cid:25) आव)य कता को <ाथिमक मानदडं के Nप म(cid:17) माना जाता ह।ै कोयला प3रवहन क(cid:25) िमतKय ियता को (cid:2)य ान म (cid:17) रखते ,ए ब,त स े नए पावर =ल ांट* क(cid:25) 8थ ापना िपटहडे और तटवत(cid:12) (cid:18)ेR* म(cid:17) करन े क(cid:25) प3रकjप ना क(cid:25) गई ह।ै जल क(cid:25) अनुपलIध ता के कारण नए 8थ ल* के चयन म(cid:17) पहल े से ही सम8य ाए ं आ रही ह,O िवशेष Nप से उड़ीसा, झारखंड और छQत ीसगढ़ जसै े राoय * म(cid:17) जहा ं कोयला <चुर माRा म(cid:17) उपलIध ह,ै म(cid:17) अिधक संZय ा म(cid:17) 8थ ल* क(cid:25) पहचान क(cid:25) गई ह।ै िवशेष Nप से पिcमी तट पर तटवत(cid:12) (cid:18)ेR* का पता लगाने म (cid:17) भी क3ठनाई हो रही ह,ै यह सम8य ा भिव!य म(cid:17) जब और अिधक 8थ ल* क(cid:25) आव)य कता होगी तो और भी गंभीर हो जाएगी। इस <कार थम2ल पावर =ल ांट* के िलए 8थ ल के िवकjप बढ़ाने के उ()े य स े ऐसे (cid:18)ेR* जहां पानी क(cid:25) कमी ह,ै म(cid:17) पानी क(cid:25) आव)य कता को Cय ूनतम बनाए रखना जNरी ह।ै 7777....2222....2222 7777लल लल ााााटटंंटटंं जजजजलललल (cid:1)(cid:1)(cid:1)(cid:1)णणणणााााललललीीीी कूJलग जल <णाली सिहत =ल ांट जल <णाली जल के qोत पर िनभ2र करती ह।ै कूJलग जल <णाली या तो मुdत चB <कार क(cid:25) अथवा कूJलग टावर का <योग करते ,ए बंद चB मुdत प3रचालन <कार क(cid:25) हो सकती ह।ै 8व zछ जल qोत* जैसे नदी, नहर, झील और जलाशय पर आधा3रत सभी अंतदशh ीय =ल ांट* के िलए अब यह अिनवाय2 बना 4दया गया ह ै 4क वे कूJलग टावर िनयोिजत कर बंद चB कूJलग <णाली क(cid:25) 8थ ापना कर(cid:17)। मुdत चB कूJलग <णाली क(cid:25) अनुमित केवल तटवत(cid:12) (cid:18)ेR* म(cid:17) ह।ै तकनीक(cid:25) आPथक पहलुE को (cid:2)य ान म(cid:17) रखते ,ए तटवत(cid:12) (cid:18)ेR* म (cid:17) समुfी जल आधा3रत कूJलग टावर* का भी <योग 4कया जा रहा है। =ल ांट* को आपूत2 4कए जाने वाले जल को िविभCन पलांट अनु<योग* के िलए उपयुdत बनाने हते ु उपचा3रत करन े क(cid:25) आव)य कता ह।ै अशु(cid:23) पानी को शु(cid:23)ीकरण =ल ांट म(cid:17) उपचा3रत 4कया जाता ह ै ता4क शु(cid:23) जल तैयार 4कया जा सके और उसका <योग शु(cid:23) जल अनु<योग* जैसे कूJलग टावर मेकअप और सPवस वाटर आ4द के िलए 4कया जा सके। इसके अलावा उdत जल का <योग डीएम =ल ांट तथा पोटhबल वाटर िस8ट म के िलए इनपुट जल के Nप म(cid:17) भी 4कया जाता ह।ै डीएम =ल ांट योजना म (cid:17) दाब 4फjट र, केसन एdस च(cid:17)जर, िडगैसर, ए3रयन एdस च(cid:17)जर और िमdस बेड पॉिलशर जैसी ज3टल सरं चनाए ं शािमल होती ह।O पोटhबल वाटल िस8ट म क(cid:25) योजना म(cid:17) 4फj" ेशन, dल ो[रग डोJजग और जल को पीने यो‚य बनाने के िलए आव)य क अCय उपचार शािमल होते ह।O िविभCन उपचार <4BयाE (dल ेरीफायर 8ल ज, 4फjट र बैक वाश और डीएम =ल ांट आ4द के अपिश!ट से पुन:उQ पादन) म(cid:17) उQस Pजत अपिश! ट जल को उपयुdत ढंग से 3रसाइकल 4कया जाता ह ै और यथाKय वहाय2 सीमा तक उपचार के प)च ात अथवा उपचार 4कए िबना उसका पुन: <योग 4कया जाता ह।ै 7777....2222....3333 जजजजलललल आआआआववववYYYYयय यय ककककतततताााा 4कसी थम2ल पावर =ल ांट म(cid:17) कंडसे र कूJलग जल <णाली तैयार करने और गीली ऐश के िनपटान हते ु भारी माRा म(cid:17) जल क(cid:25) आव)य कता होती ह।ै जल क(cid:25) अCय आव)य कताE म(cid:17) पावर साइकल मेकअप, सPवस ऑर पोटhबल <योग, कोjड ड8ट स<ेशन आ4द शािमल ह।O ऐश के िनपटान हते ु कूJलग टावर Iल ो डाउन प(cid:23)ित का <योग 4कया जाता ह।ै =ल ांट क(cid:25) जल आव)य कता िविभCन घटक* जसै े जल क(cid:25) गुणवQत ा, कंडश(cid:17) र कूJलग <णाली के <कार, कोयला क(cid:25) गुणवQत ा, ऐश िनपटान <णाली के <योग, अपिश!ट जल <बंधन पहलुE पर िनभर2 होती ह।ै ऐश हडO Jलग <णाली के िविभCन मॉडल* के साथ एक साथ 1000 मेगावाट (cid:18)मता वाले ज3टल पावर =ल ांट के िलए जल क(cid:25) खपत नीचे तािलका 7.2 म(cid:17) दशा2ई गई ह ै :172 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ततततााााििििललललककककाााा 7777....3333 (cid:1)(cid:1)(cid:1)(cid:1)....सससस..ंं..ंं ऐऐऐऐशशशश हहहहडड(cid:19)(cid:19)डड(cid:19)(cid:19) (cid:21)(cid:21)(cid:21)(cid:21)ललललगगगग (cid:14)(cid:14)(cid:14)(cid:14)णणणणााााललललीीीी ककककाााा (cid:14)(cid:14)(cid:14)(cid:14)ककककाााारररर ससससीीीीडडडड(cid:29)(cid:29)(cid:29)(cid:29)(cid:30)(cid:30) (cid:30)(cid:30) यय यय ूू ूू (cid:14)(cid:14)(cid:14)(cid:14)णणणणााााललललीीीी ककककाााा (cid:31)(cid:31)(cid:31)(cid:31)लल लल ाााांंटटंंटट मममम "" ""जजजजलललल कककक$$$$ खखखखपपपपतततत 3333 \\\\ललललााााईईईई ऐऐऐऐशशशश बबबबॉॉॉॉटटटटमममम ऐऐऐऐशशशश ससससीीीीओओओओससससीीीी******** ((((एएएएमममम ////एएएएचचचच)))) 1111 ससससााााममममाााा>>>>यय यय (cid:2)(cid:2)(cid:2)(cid:2)वव वव MMMMपपपप – गगगगीीीीललललीीीी गगगगीीीीललललीीीी 5.0 2222999900000000**** आआआआपपपपााााततततककककाााालललल – गगगगीीीीललललीीीी 2222 ससससााााममममाााा>>>>यय यय (cid:2)(cid:2)(cid:2)(cid:2)वव वव MMMMपपपप –––– शशशशुUुUुUुUकक कक गगगगीीीीललललीीीी 5555....0000 2222888855550000 आआआआपपपपााााततततककककाााालललल –––– एएएएचचचचससससीीीीएएएएससससडडडडीीीी************ नोट :::: * =ल ांट <चालन क(cid:25) आरंिभक अविध जब तक |लाई ऐश का पया2=त सदपु योग सुिनिcत नह(cid:7) कर िलया जाता ह,ै के दौरान |लाई ऐश के िनपटान हते ु गीली प(cid:23)ित का <योग 4कया जाएगा और इस अविध के दौरान अित3रdत 3 जल आव)य कता ऊपर दशा2ई गई माRा से अनुसार लगभग 600 एम /एच से अिधक होगी। ** सांfण चB *** उzच सांfण 8ल री िनपटान ऐसी <ौ#ोिग4कय* के <योग से पावर =ल ांट म(cid:17) जल क(cid:25) खपत को और भी कम 4कया जा सकता ह,ै जो जल क(cid:25) आव)य कता को Cय ूनतम करने म(cid:17) सहायक ह।O 7777....2222....4444 =ल ांट म(cid:17) जल के इ!ट तम सदपु योग हते ु <ौ#ोिग4कया ं जल क(cid:25) कमी और थम2ल िव#ुत उQप ादन के िलए कम माRा म(cid:17) जल आवंटन के कारण थम2ल पावर =ल ांट* म(cid:17) =ल ांट जल <णाली के इ!ट तम उपयोग हते ु लगातार <यास 4कए गए ह।O िपछले कुछ वषU के दौरान िविभCन अनु<योग* के िलए जल के सदपु योग aारा जल आव)य कता को इ!ट तम बनाया गया ह,ै इसके िलए अशु(cid:23) जल क(cid:25) गुणवQत ा ठीक करने के िलए पया2=त माRा म(cid:17) उपचार, िविभCन <योग* के िलए आंिशक Nप से खपत कम करने और कमतर अनु<योग* के िलए =ल ांट के अपिश! ट जल के <योग जैसे उपाय 4कए जा रह े हO। =ल ांट म(cid:17) जल क(cid:25) आव)य कता को और अिधक इ!ट तम बनाया गया ह।ै इसके िलए ऐसी <ौ#ोिग4कय* को अपनाया गया ह ै िजनका उ()े य िविभCन अनु<योग* के िलए जल क(cid:25) खपत कम करना और =ल ांट के अपिश!ट जल क(cid:25) 3रसाइकJलग कर उसका अिधकतम सदपु योग सुिनि)च त करना ह।ै =ल ांट के अपिश!ट जल के सदपु योग क(cid:25) आव)य कता और योजनाE को पया2वरण और वन मंRालय तथा सीपीसीबी/एसपीसीबी aारा इस संदभ2 म(cid:17) जारी 4कए गए िनदशे * को (cid:2)य ान म(cid:17) रखते ,ए तैयार 4कया जाता ह।ै अभी हाल ही म(cid:17) कुछ प3रयोजनाE के िलए पया2वरण और वन मंRालय ने ऐसे िनदशे जारी 4कए ह O 4क =ल ांट क(cid:25) बाउंrी से कोई भी अपिश!ट पदाथ2 बाहर नह(cid:7) आने चािहए। इसके प3रणाम8व Nप =ल ांट क(cid:25) जल <णाली और =ल ांट के अपिश!ट जल का उपचार और 3रसाइकJलग िनतांत आव) यक हो गई ह।ै थम2ल =ल ांट* के िलए आव)य क जल के इ!ट तमीकरण हते ु अपनाए जान े वाले उपाय/<ौ#ोिग4कय* के िववरण नीचे 4दए गए ह O :¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 173 7777....2222....4444....1111 ककककूूूूmmmmललललगगगग जजजजलललल (cid:1)(cid:1)(cid:1)(cid:1)णणणणााााललललीीीी कूJलग जल <णाली कंडस(cid:17) र और Iव ॉयलर तथा टबा2इन के अनुषंगी उपकरण* और हीट एd सच(cid:17)जर =ल ेट* स े अपिश! ट ऊ!म ा को हटान े के िलए उपलIध कराई जाती ह।ै कूJलग टावर म(cid:17) पानी का वा!प ीकरण 4कया जाता ह ै और प3रचािलत 4कए जान े वाले जल म(cid:17) घुिलत नमक क(cid:25) माRा को कम करन े के िलए इसका इ8त ेमाल 4कया जाता ह।ै वा!प ीकरण, गंदगी और Iल ोडाउन के कारण होने वाली जल क(cid:25) हािन क(cid:25) <ितपूPत के िलए कूJलग जल <णाली म(cid:17) पूरक जल <ेिषत 4कया जाता ह।ै शु!क कूJलग <णािलयां, िजनम(cid:17) जल का वा!प ीकरण नह(cid:7) होता ह,ै म(cid:17) कंडस(cid:17) र कूJलग <णाली के िलए अित3रdत जल क(cid:25) आव)य कता नह(cid:7) होती ह।ै इस <कार इनका <योग काफ(cid:25) हद तक जल क(cid:25) खपत को कम करन े के िलए 4कया जाता सकता ह।ै 7777....2222....4444....2222 गगगगीीीीललललीीीी ककककूूूूmmmmललललगगगग (cid:1)(cid:1)(cid:1)(cid:1)णणणणााााललललीीीी मममम $$ $$इइइइUUUUटट टट ततततममममीीीीककककररररणणणण गीले कूJलग टावर* के िलए पूरक जल आव)य क होता ह।ै इसक(cid:25) माRा सीडIj य ू <णाली म(cid:17) बनाए जाने वाले सांfण चB (सीओसी) पर िनभर2 करती ह।ै सीडIj य ू <णाली म(cid:17) अपनाया जाने वाला सांfण चB पूरक जल क(cid:25) गुणवQत ा पर िनभ2र करता ह।ै वत2मान <4Bया म(cid:17) कूJलग टावर तक पूरक जल के Nप म(cid:17) शु(cid:23) जल का <योग 4कया जाता ह ै और इसका <चालन उपयुdत रासायिनक डोJजग के साथ 5.0 के सीओसी पर सीडIj य ू <णाली के <चालन हते ु 4कया जाता ह,ै ता4क =ल ांट क(cid:25) जल आव)य कता को अिधकतम उपयुdत बनाया जा सके। इसके िलए कम से कम 2% सीडIj य ू <वाह वाले परू क सीटी जल क(cid:25) आव)य कता होती ह ै और सीडIj य ू सी <णाली म(cid:17) <ेिषत 4कए जान े वाले जल क(cid:25) माRा का <वाह 0.35% होना चािहए। ऐश हडO Jलग =ल ांट के िलए जल क(cid:25) आव)य कता को उपलIध Iल ो डाउन जल से पूरा 4कया जाता ह।ै य4द सीडIj य ू <णाली से उपलIध Iल ो डाउन जल क(cid:25) तुलना म(cid:17) ऐश हडO Jलग <णाली के िलए जल क(cid:25) आव)य कता कम होती ह,ै तो शेष Iल ो डाउन जल को =ल ांट के सीएमबी के िलए इ8त ेमाल 4कया जाता ह।ै य4द शु!क ऐश हडO Jलग, ऐश प”ड जल क(cid:25) 3रसाइकJलग आ4द प(cid:23)ितय* को अपनाने स े ऐश हडO Jलग =ल ांट के िलए जल क(cid:25) आव)य कता और कम हो जाती ह,ै तो =ल ांट सीएमबी के िलए अिधक माRा म(cid:17) Iल ो डाउन जल उपलIध होगा। Iल ो डाउन जल क(cid:25) माRा को सीडIj य ू <णाली के सीओसी को बढ़ाकर कम 4कया जा सकता है, इस ल%य को प3रचािलत 4कए जाने वाले जल क(cid:25) रासायिनक िवशेषताE म(cid:17) उपयुdत ढंग से सुधार करके <ा=त 4कया जा सकता ह।ै 7777....2222....4444....3333 शशशशुUुUुUुUकक कक ककककूूूूmmmmललललगगगग (cid:1)(cid:1)(cid:1)(cid:1)णणणणााााललललीीीी शु!क कूJलग <णािलयां वायु aारा सू%म ˜ूब* म(cid:17) कूJलग कर <Qय (cid:18) Nप से वातावरण म(cid:17) अपिश!ट उ!म ा को पावर साइकल म(cid:17) <ेिषत नह(cid:7) करती ह।O गीली कूJलग <णािलय*, जो प3रवेशी नम बjब तापमान के संदभ2 म(cid:17) <चािलत होती ह O और िजनम(cid:17) संवेदनशील तथा अंतPनिहत ऊ!म ा का अंतरण शािमल होता ह,ै स े िवपरीत शु!क कूJलग <णािलयां प3रवेशी शु!क बjब तापमान के संदभ 2 म(cid:17) <चािलत होती ह O और इनम (cid:17) केवल संवेदनशील कूJलग ही शािमल होती ह।O शु!क कूJलग <णाली म(cid:17) <ा=त टबा2इन बैक <ेशर लो हीट "ांसफर को4फिशएटं और शु!क बjब तापमान के संदभ2 म(cid:17) <चालन के कारण गीली कूJलग <णाली क(cid:25) तुलना म(cid:17) काफ(cid:25) अिधक होता है। शु!क कूJलग <णािलय* को िनbन िलिखत दो }ेिणय* म(cid:17) Kय ापक तौर पर वग(cid:12)कृत 4कया जा सकता है : क) <Qय (cid:18) शु!क कूJलग <णाली ख) अ<Qय (cid:18) शु!क कूJलग <णाली <Qय (cid:18) शु!क कूJलग <णाली म(cid:17) एलपी टबा2इन से बाहर िनकलने वाली वा!प को मेकेिनकल rा|ट फैन का इस ् तेमाल करत े ,ए प3रवेशी वायु aारा सू%म ˜ूब* वाली एक <णाली म(cid:17) <Qय (cid:18) Nप से शीतल 4कया जाता ह।ै वा!प <ेषण <णाली म(cid:17) दाब को कम करने के िलए इन यिू नट* को एयर कूjड कंडस(cid:17) र (एसीसी) कहा जाता ह ै और इCह (cid:17) टबा2इन हॉल के समीप 8थ ािपत करन े क(cid:25) आव)य कता होती ह।ै सू%म ˜ूब* क(cid:25) Kय व8थ ा सामाCय त: ‘’ए’’ Œेम अथवा फो8ड 2 rा|ट फैन स े कवर 4कए गए डjे ट ा के Nप म(cid:17) क(cid:25) जाती ह,ै ता4क भूिम क(cid:25) आव)य कता को कम 4कया जा सके।174 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 4कसी अ<Qय (cid:18) शु!क कूJलग <णाली म(cid:17) टबा2इन से उQस Pजत होने वाली वा!प को 4कसी कंडस(cid:17) र म(cid:17) जल भरकर ठंडा 4कया जाता ह,ै जो पृ!ठ ीय <कार अथवा <Qय (cid:18) संपक2 <कार का हो सकता ह ै और इस <णाली म(cid:17) गरम जल को <ाकृितक rा|ट टावर का इ8त ेमाल करते ,ए सू%म ˜ूब बंडल* म(cid:17) प3रवेशी वायु aारा ठंडा 4कया जाता ह।ै चूं4क इस <4Bया म(cid:17) जल पाइJपग शािमल होती ह,ै अत: ये वायु शीतलन यूिनट(cid:17) मुdत =ल ाटं से दरू 4कसी भी 8थ ान पर अवि8थत क(cid:25) जा सकती ह।O हीट एdस च(cid:17)जर एलीम(cid:17)ट क(cid:25) ऊ(cid:2)व ा2धर Kय व8थ ा टावर क(cid:25) प3रिध के आसपास इसके आधार पर क(cid:25) जाती ह ै जहां टावर शेल के अंदर क(cid:25) गम2 वायु को प3रवेशीय वायु के साथ ठंडा 4कया जाता ह।ै शु!क कूJलग <ौ#ोिग4कय* म(cid:17) उप8क र लागत अिधक ह ै और उzच कंडश(cid:17) र बैक <ेशर के कारण यूिनट का पावर आउटपुट घट जाता ह,ै िजसके प3रणाम8व Nप टबा2इन चB क(cid:25) ऊ!म दर अिधक हो जाती ह ै हालां4क इन <ौ#ोिग4कय* म(cid:17) एक बेहतर <ावधान शािमल ह ै िजसस े थम2ल पावर =ल ांट* को पानी क(cid:25) कमी वाले (cid:18)ेR* म(cid:17) भी 8थ ािपत 4कया जा सकता ह।ै िव)व के िविभCन भाग* म(cid:17) काफ(cid:25) संZय ा म(cid:17) बड़ े आकार वाली (≥ 600 MW) यूिनट* सिहत शु!क कूJलग <णािलयां <चालनरत ह।O भारत म(cid:17) कुछ छोटे आकार वाल े संयुdत चB =ल ांट*, कैि=टव पावर =ल ांट* और औ#ोिगक यिू नट* के िलए भी वायु शीतल कंडस(cid:17) र उपलIध कराए गए ह।O थम2ल पावर =ल ांट* म(cid:17) कंडस(cid:17) र कूJलग के िलए शु!क कूJलग <णािलय* के अनु<योग aारा =ल ांट जल खपत को कम करने क(cid:25) संभावनाए ं तलाशने के उ()े य से केCf ीय िव#ुत <ािधकरण ने एक सिमित ग3ठत क(cid:25) ह,ै िजसम (cid:17) एनटीपीसी, बीएचईएल, आरआरवीयूएनएल, महारा!" जेनको, सीईएससी और टीसीई के <ितिनिध शािमल ह O जो थम2ल पावर =ल ांट* म (cid:17) कंडस(cid:17) र* के िलए शु!क कूJलग <णाली के <ावधान क(cid:25) जाचं कर(cid:17)गे। सिमित स े अपे(cid:18)ा ह ै 4क वह िविभCन तक(cid:25)नीक(cid:25) आPथक पहलुE को (cid:2)य ान म(cid:17) रखत े ,ए थम2ल पावर =ल ांट* के िलए शु!क कूJलग <णािलय* के िलए उपलIध िवकjप * पर सुझाव द।े 7777....2222....5555 ऐऐऐऐशशशश हहहहडडddडडdd mmmmललललगगगग (cid:1)(cid:1)(cid:1)(cid:1)णणणणााााललललीीीी ऐश हडO Jलग <णाली के िलए जल आव)य कता को Cय ूनतम करन े हते ु अपनाए जा सकने वाले िविभCन उपाय*/<ौ#ोिग4कय* के िववरण नीचे 4दए गए ह O : 7777....2222....5555....1111 ऐऐऐऐशशशश ववववााााटटटटरररर कककक1111 पपपपननुुननुु ::::(cid:1)(cid:1)(cid:1)(cid:1)ााााििििllll एएएएवववव ंं ंं(cid:1)(cid:1)(cid:1)(cid:1)ययययोोोोगगगग थम2ल पावर =ल ांट* म(cid:17) पारंप3रक Nप से गीली ऐश िनपटान <णाली का <ावधान 4कया गया ह।ै |लाई ऐश और बॉटम ऐश पतली 8ल री के Nप म(cid:17) नीचे बनाए गए ऐश पॉvड म(cid:17) िन8स ा3रत होती ह।ै पया2वरण और वन मंRालय क(cid:25) आव)य कता के अनसु ार ऐश पॉvड वाटर क(cid:25) पुन: <ािx क(cid:25) जाए और जल संर(cid:18)ण को (cid:2)य ान म(cid:17) रखत े ,ए ऐश हडO Jलग <णाली म(cid:17) उसका पनु : <योग 4कया जाए। ऐश पॉvड से लगभग 70% जल पुन: <ा=त 4कया जा सकता ह ै और ऐश हडO Jलग =ल ांट म(cid:17) उसका इ8त ेमाल 4कया जा सकता ह।ै इस <कार =ल ांट क(cid:25) जल <णाली से ऐश हडO Jलग =ल ांट को आपू2 त 4कए जाने वाले जल क(cid:25) आव)य कता इस सीमा तक घटाई जा सकती ह।ै 7777....2222....5555....2222शशशशुUुUुUुUकक कक ऐऐऐऐशशशश ििििननननपपपपटटटटाााानननन गीली ऐश िनपटान के प3रणाम8व Nप भूिमगत जल सदं िू षत होता ह ै dय *4क ऐश पॉv ड से सीपेज और उसके आसपास के (cid:18)ेR म(cid:17) ऐश बंड के संभािवत 3रसाव क(cid:25) सम8य ा बनी रहती ह।ै शु!क ऐश िनपटान <णाली स े इन सम8य ाE का समाधान होन े के साथ साथ जल क(cid:25) खपत भी कम होती ह ै और |लाई ऐश का सीम(cid:17)ट =ल ांट*, भवन साम\ी, भूिम भराव और तटबंध* के िनमा2ण आ4द म(cid:17) सदपु योग सुकर बनता ह।ै |लाई ऐश के बढ़ रहे <गामी सदपु योग को (cid:2)य ान म(cid:17) रखते ,ए |लाई ऐश क(cid:25) गीली िनपटान <णािलयां धीरे धीरे समा=त होती जा रही ह।O =ल ांट जल क(cid:25) आव)य कता केवल बॉटम ऐश के गीले िनपटाने हते ु ही पड़ती ह ै जो कुल ऐश उQप ादन और |लाई ऐश के उस भाग िजसका िनपटान श!ु क Nप म(cid:17) नह(cid:7) 4कया जाता है, का लगभग 20% ह।ै 7777....2222....5555....3333 शशशशुUुUुUुUकक कक बबबबॉॉॉॉटटटटमममम ऐऐऐऐशशशश हहहहडडडडdddd mmmmललललगगगग बॉटम ऐश का रख रखाव पारंप3रक Nप से जल म(cid:17) डूबे ,ए होपर म(cid:17) 4कया जाता ह ै और 4फर पतली 8ल री के Nप म(cid:17) |लाई ऐश के साथ ऐश पॉvड म(cid:17) आगामी िनपटान हते ु Jdलकर \ाइंडर म(cid:17) \ाइंड 4कया जाता ह।ै कुछ पावर =ल ांट* म(cid:17) हाइrो-िबन का <योग करत े ,ए अ(cid:23)श2 ु!क प(cid:23)ित का इ8त ेमाल 4कया जाता ह।ै जल संर(cid:18)ण के िलए¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 175 बॉटम ऐश का शु!क िनपटान भी 4कया जा सकता ह।ै शु!क िन!क ष2ण, कूJलग और पjव राइoड कोल फायड 2 Iव ॉयलर से बॉटम ऐश <ेषण के िलए <ौ#ोिग4कयां उपलIध ह।O भारत म(cid:17) इस <ौ#ोिगक(cid:25) का इ8त ेमाल 300 मेगावाट (cid:18)मता वाली यूिनट के साथ एक थम2ल पावर =ल ाटं म(cid:17) 4कया जा रहा ह।ै 7777....2222....5555....4444 उउउउ]]]]चच चच ससससााााWWंंWWंं णणणण (cid:2)(cid:2)(cid:2)(cid:2)लल लल ररररीीीी ििििननननपपपपटटटटाााानननन ((((एएएएचचचचससससीीीीएएएएससससडडडडीीीी)))) (cid:1)(cid:1)(cid:1)(cid:1)णणणणााााललललीीीी जैसा नाम से ही पता चलता ह ै 4क एचसीएसडी के अंतग2त कोयला आधा3रत थम2ल पावर =ल ांट से उzच सांfण वाली 8ल री के Nप म(cid:17) ऐश िनपटान (cid:18)ेR म (cid:17) |लाई ऐश का िनपटान 4कया जाता ह।ै यह <4Bया पया2वरण क(cid:25) दिृ ~ से अनुकूल ह ै और इसम(cid:17) लगभग 20% सांfण पर पतली 8ल री के प3रवहन क(cid:25) तुलना म(cid:17) सकाराQम क िव8थ ापन पंप* पर भार िनयोिजत करते ,ए 60% से अिधक ठोस 8ल री का िनपटान शािमल ह।ै इस <कार अिधक सांfण युdत 8ल री िनपटान (cid:18)ेR म(cid:17) एक <ाकृितक 8ल ोप िनPमत करती ह ै और इसे फैलाने के िलए यांिRक आव)य कता नह(cid:7) पड़ती। इसके अलावा इस <कार के 8ल ोप पर Cय ूनतम माRा म(cid:17) पानी डालने क(cid:25) आव)य कता होती ह ै और यह 8थ ायी Nप से शु!क लOड4फल म(cid:17) उपयोगी ह।ै एचसीएसडी <णाली म(cid:17) जल क(cid:25) खपत पतली 8ल री िनपटान <णाली म(cid:17) जल क(cid:25) आव)य कता क(cid:25) तलु ना म(cid:17) लगभग छ: गुना कम होती ह।ै हालां4क य4द ऐश पॉvड से जल क(cid:25) पुन: <ािx को (cid:2)य ान म(cid:17) रखा जाता ह,ै तो गीली िनपटान प(cid:23)ित क(cid:25) तुलना म (cid:17) पानी क(cid:25) खपत को ब,त अिधक कम नह(cid:7) 4कया जा सकता। 7777....2222....6666 >>>>यय य य ननूूननूू ततततमममम अअअअपपपपििििशशशशUUUUटट टट ििििनननन(cid:2)(cid:2)(cid:2)(cid:2)तत तत ााााररररणणणण 4कसी ज3टल थमल2 पावर =ल ाटं स े उQस Pजत अपिश!ट जल म (cid:17) श(cid:23)ु ीकरण 8ल ज, 4फjट र बकै वाश, सीटी Iल ो डाउन, Iव ॉयलर Iल ो डाउन, डीएम =ल ांट और कंडस(cid:17) ेट पॉिलJशग =ल ांट आ4द से उQस Pजत अपिश!ट शािमल होत े ह।O 4कसी इ!ट तम =ल ांट जल योजना के िलए यह आव)य क ह ै 4क 8ल ज जल और 4फjट र बैग वाश जल को 3रसाइकल 4कया जाए और पूव2 उपचार =ल ांट म(cid:17) उसका इ8त ेमाल 4कया जाए और अCय अपिश!ट जल का उपयोग िनbन \ेड वाले अनु<योग* के िलए यथा Kय वहाय 2 सीमा तक 4कया जाए। ऐस े अपिश!ट िजसका सदपु योग नह(cid:7) 4कया जा सकता, म(cid:17) सीटी Iल ो डाउन और पुन: उQस Pजत अपिश!ट के कारण टीडीएस क(cid:25) माRा ब,त अिधक होती ह।ै य4द =ल ांट म(cid:17) 3रसाइकJलग के िलए इस अपिश!ट जल स े पानी पुन: <ा=त 4कया जाता ह,ै तो इसके उपचार के िलए 3रवस2 ऑ8म ोिसस <ौ#ोिगक(cid:25) का <योग आव)य क होगा ता4क अिधकतम जल पुन: <ा=त 4कया जा सके और जम जाने वाले घुलनशील पदाथU को हटाया जा सकता ह।ै 7777....3333 जजजजलललल कककक1111 बबबबचचचचतततत ऊपर दी गई जानकारी स े यह दखे ा जा सकता ह ै 4क पावर =ल ांट* म(cid:17) जल क(cid:25) खपत को कम करन े क(cid:25) अपार संभावनाए ं ह,O िजCह (cid:17) मामला दर मामला आधार पर लागू 4कए जान े क(cid:25) आव)य कता ह।ै गील े कूJलग टावर युdत पावर =ल ांट* के िलए जल क(cid:25) कटौती Kय वहा3रक सीमा तक संभव उzच तर सीओसी पर सीडIj य ू <णाली के <चालन aारा अिधकतम माRा म(cid:17) क(cid:25) जा सकती ह।ै इसके िलए <ी-"ीटम(cid:17)ट =ल ांट म(cid:17) 4फjट र बैक वॉश और 8ल ज शोधन जल क(cid:25) 3रसाइकJलग, ऐश हडO Jलग =ल ांट म(cid:17) जल क(cid:25) खपत कम करने और अपिश!ट जल का अिधकतम सदपु योग जैसी प(cid:23)ितयां अपनाई जा सकती ह।O इन उपाय* से =ल ांट वाटर िस8ट म म(cid:17) लगभग 20% जल क(cid:25) बचत क(cid:25) जा सकती ह।ै य4द शु!क कूJलग <णाली को शु!क ऐश हडO Jलग के साथ अपनाया जाता ह ै तो =ल ांट म (cid:17) जल क(cid:25) खपत को लगभग 80 से 85% तक घटाया जा सकता ह।ै ----------------++++++++++++----------------176 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] अअअअ(cid:2)(cid:2)(cid:2)(cid:2)यय यय ाााायययय 8888 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) औऔऔऔरररर 11113333वववव(cid:7)(cid:7)(cid:7)(cid:7) पपपपचचंंचचंं ववववषषषष(cid:14)(cid:14)(cid:14)(cid:14)यययय ययययोोोोजजजजननननाााा हहहहततेेततेे ुुुुभभभभााााररररततततीीीीयययय ििििवववव(cid:25)(cid:25)(cid:25)(cid:25)ततुुततुु (cid:26)(cid:26)(cid:26)(cid:26)(cid:27)(cid:27)ेे(cid:27)(cid:27)ेे ककककेेेे ििििललललएएएए ककककमममम ककककााााबबबबनन!!नन!! उउउउ####सस सस जजजजनन!!नन!! ररररणणणणननननीीीीिििितततत 8888....0000 &&&&''''तत तत ााााववववननननाााा िव(cid:3)ुत दशे क(cid:11) अथ(cid:14)(cid:15)य व(cid:17)थ ा के संपूण(cid:14) िवकास के िलए सवा(cid:14)िधक मह(cid:29)व पूण(cid:14) अवसंरचना(cid:29)म क आव" यकता ह।ै सभी उ(cid:3)ोग धंधे अपने &चालन के िलए काफ(cid:11) हद तक उिचत दर पर िव"व सनीय और गुणव(cid:29)त ायु*त िव(cid:3)ुत क(cid:11) उपल+ध ता पर िनभर(cid:14) ह।- दशे क(cid:11) वािणि/यक और घरेल ू िव(cid:3)ुत आव"य कताए ं तजे ी स े बढ़ती जा रही ह।- अत: मांग के अनु4प िव(cid:3)ुत उपल+ध कराना सरकार क(cid:11) उ5च &ाथिमकता6 म7 से एक ह।ै उपभो*त ा6, चाह े उ(cid:3)ोग धंधे, उ(cid:3)म, घरेल ू उपभो*त ा अथवा 9कसान, कोई भी ह;, को उनके &योग के िलए िव(cid:3)ुत उपल+ध करान े के िलए संपूण (cid:14) <ृंखला का िवकास सुिनि?त करना अिनवाय(cid:14) ह।ै इस <ृंखला म7 िव(cid:3)ुत उ(cid:29)प ादन से लेकर पारेषण और सवा(cid:14)िधक उपयु*त एवं दB ढंग से िव(cid:3)तु खपत के अंितम Dबद ुतक इसके िवतरण का सुधार शािमल ह।ै िव(cid:3)ुत क(cid:11) मांग िव(cid:3)ुत के उ(cid:29)प ादन से लगातार बढ़ रही ह।ै इसिलए दशे म 7 पीक पावर और ऊजा (cid:14) क(cid:11) कमी इस तFय के बावजूद भी 9क (cid:17)व तंGता से अब तक उ(cid:29)प ादन Bमता म 7 कई गनु ा वृिH Iई है, अपया(cid:14)Jत उ(cid:29)प ादन अथवा पारेषण या िवतरण सुिवधा6 क(cid:11) कमी के कारण अभी भी बनी Iई ह।ै दशे म7 िव(cid:3)ुत क(cid:11) मांग औसतन लगभग 7- 8% क(cid:11) दर से बढ़ रही ह ै और मांग और आपूKत का अंतराल वष(cid:14) दर वष(cid:14) बढ़ता जा रहा ह।ै दशे के आKथक िवकास और लोग; के बेहतर जीवन (cid:17)त र के िलए िव"व सनीय और 9कफायती िव(cid:3)ुत उपल+ध कराना एक &मुख लLय ह।ै दशे क(cid:11) अथ(cid:14)(cid:15)य व(cid:17)थ ा के िवकास म7 इसके मह(cid:29)व के अलावा यह आम आदमी क(cid:11) Dजदगी म7 भी मह(cid:29)व पूण(cid:14) भूिमका अदा करती ह ै और जीवन क(cid:11) गुणव(cid:29)त ा पर इसका &(cid:29)य B &भाव पड़ता ह।ै लगभग 56.5% Nामीण पOरवार; को अभी भी िव(cid:3)ुत उपल+ध नहP ह ै और इसी बात को Qय ान म7 रखत े Iए हमारी सरकार ने राRS ीय Tय ूनतम साझा काय(cid:14)Uम म7 आगामी पांच वषV म7 सभी पOरवार; के िव(cid:3)तु ीकरण को पूरा करने का लLय िनधा(cid:14)Oरत 9कया ह।ै जहां एक ओर हम7 अपनी बढ़ रही मांग को पूरा करने के िलए एक िजXम ेदार राRS के 4प म7 ऊजा(cid:14) क(cid:11) उपल+ध ता बढ़ानी ह,ै वहP दसू री ओर भारत ने ऊजा(cid:14) तीYता को कम करने के िलए कम काब(cid:14)न उ(cid:29)स ज(cid:14)न रणनीित अपनाने और दशे के (cid:17)थ ायी िवकास को बढ़ावा दने े का िन"च य 9कया ह।ै (cid:17)थ ायी िवकास से आशय ऐसे िवकास से ह ै जो भभभभााााववववीीीी पपपपीीीी((((ढढढढयययय**** ककककोोोो उउउउननननकककक++++ आआआआवववव----यय यय ककककतततताााा.... कककक++++ पपपप00ूू00ूू तततत ककककेेेे ििििललललएएएए उउउउननननकककक++++ ययययोोोो1111यय यय तततताााा ककककेेेे ससससााााथथथथ ककककोोोोईईईई ससससममममझझझझौौौौतततताााा ((((ककककएएएए ििििबबबबननननाााा ववववततततमम!!मम!! ाााानननन कककक++++ आआआआवववव----यय यय ककककतततताााा.... ककककोोोो पपपपररूूररूू ाााा ककककररररनननन ेेेे मममम 66 66 ससससहहहहााााययययकककक हहहहोोोोतततताााा हहहह।।ैै।।ैै Nीनहाउस गैस उ(cid:29)स जन(cid:14) को कम करने, यथा(cid:15)य वहाय(cid:14) सीमा तक नवीकरणीय ऊजा(cid:14) संसाधन; का इ(cid:17)त ेमाल करने के उZ"े य से हाइ[ो और Tय ूि*लयर उ(cid:29)प ादन को बढ़ावा दने े, मौजूदा पावर Jल ांट; क(cid:11) दBता बढ़ाने और िव(cid:3)तु उ(cid:29)प ादन क(cid:11) दBता बढ़ाने के िलए नई &ौ(cid:3)ोिग9कय; को लागू करने तथा मांग पB &बंधन और संरBण पHितय; पर जोर 9दया जा रहा ह।ै चूं9क भिवRय म7 भी अिधकांश िव(cid:3)ुत उ(cid:29)प ादन कोयला आधाOरत पावर Jल ांट; से 9कया जाएगा। अत: सुपर 9UOटकल &ौ(cid:3)ोिगक(cid:11) को लागू करने का &(cid:17)त ाव 9कया ह।ै िव(cid:3)तु उ(cid:29)प ादन के िलए यह &ौ(cid:3)ोिगक(cid:11) सब 9UOटकल वाR प मानदडं ; के साथ प_व राइ/ड कोल +व ॉयलर &ौ(cid:3)ोिगक(cid:11) क(cid:11) तलु ना म7 कोयले को अिधक दB बनाएगी। िव(cid:3)ुत उ(cid:29)प ादन के िलए एक(cid:11)कृत गैसीकरण संयु*त चU (आईजीसीसी) &ौ(cid:3)ोिगक(cid:11) के इ(cid:17)त ेमाल के िलए (cid:15)य वहाय(cid:14)ता अQय यन हते ु भी &यास शु4 9कए गए ह-। इस नोट म7 भारतीय पावर िव(cid:3)ुत BेG aारा एनएपीसीसी म7 उि_लिखत सरकार के उZ"े य ; के अन4ु प जीएचजी उ(cid:29)स ज(cid:14)न को कम करने के िलए अपनाई जा रही रणनीित के िववरण 9दए गए ह।- 8888....1111 33331111....3333....2222000011112222 कककक++++ िििि''''थथथथ िि िितततत ककककेेेे अअअअननननससुुससुु ाााारररर ''''थथ थथ ााााििििपपपपतततत (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा 31.3.2012 क(cid:11) ि(cid:17)थित के अनुसार कुल (cid:17)थ ािपत Bमता 1,99877 मेगावाट थी, िजसम7 38,990 मेगावाट हाइ[ो, 1,31,603 मेगावाट थम(cid:14)ल (गैस और डीजल आधाOरत), 4,780 मेगावाट नयूि*लयर और 24,503 मेगावाट नवीकरणीय ऊजा(cid:14) bोत; से शािमल ह।- 31.3.2012 क(cid:11) ि(cid:17)थित के अनुसार (cid:17)थ ािपत Bमता के &कारवार िववरण ततततााााििििललललककककाााा 8888....1111 और पपपपााााईईईई चचचचााााटटटट!! !! 8888....1111 म7 नीचे दशा(cid:14)ए गए ह।-¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 177 ततततााााििििललललककककाााा 8888....1111 33331111....00003333....2222000011112222 ततततकककक ''''थथ थथ ााााििििपपपपतततत (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा (cid:1)(cid:1)(cid:1)(cid:1)(cid:3)(cid:3)ेे(cid:3)(cid:3)ेे हहहहााााइइइइ(cid:7)(cid:7)(cid:7)(cid:7)ोोोो थथथथमममम(cid:12)ल(cid:12)ल(cid:12)ल(cid:12)ल ((((ममममगगेेगगेे ााााववववााााटटटट)))) पपपपररररममममााााणणणण ुु ुु आर.ई.एस. **** ककककुुुुलललल ((((ममममगगेेगगेे ााााववववााााटटटट)))) ((((ममममगगेेगगेे ााााववववााााटटटट)))) ((((ममममगगेेगगेे ााााववववााााटटटट)))) ((((ममममगगेेगगेे ााााववववााााटटटट)))) कोयला गैस डीजल जोड़ ((((एएएएममममएएएएननननआआआआररररईईईई)))) रा(cid:3) य 27380 49457.0 4965.32 602.61 55024.93 0 3513.72 88885555999911118888....66665555 िनजी 2525.00 23450.38 6713.50 597.14 30761.02 0 20989.73 55554444222277775555....77775555 के(cid:8) (cid:9)ीय 9085.4 39115.00 6702.23 0 45817.23 4780 0 55559999666688882222....66663333 जजजजोोोोड़ड़ड़ड़ 33338888999999990000....4444 111111112222000022222222....33338888 11118888333388881111....00005555 1111111199999999....77775555 111133331111666600003333....11118888 4444777788880000 22224444555500003333....44445555 111199999999888877777777....00003333 • आआआआररररईईईईएएएएसससस – ननननववववीीीीककककररररणणणणीीीीयययय ऊऊऊऊजजजजाााा !! !!;;;;ोोोोतततत • 31.10.2012 क(cid:11) वत(cid:14)मान आईसी 2,09,276 ममममगगेेगगेे ााााववववााााटटटट ह।ै चचचचााााटटटट!! !! 8888....1111 8888....22222222000011111111----11112222 ककककेेेे ददददौौौौरररराााानननन ििििममममिििि====तततत उउउउ####पप पप ााााददददनननन वष(cid:14) 2011-12 के दौरान ऊजा(cid:14) उ(cid:29)प ादन 929 िबिलयन यूिनट था। इसम7 136 िबिलयन यूिनट हाइ[ो (भूटान स े 5.3 िबिलयन यूिनट के आयात सिहत), 708 िबिलयन यूिनट थम(cid:14)ल (गैस और डीजल सिहत), 32 िबिलयन यूिनट Tय ूि*लयर और 52 िबिलयन यूिनट नवीकरणीय ऊजा(cid:14) bोत; स े शािमल ह।ै वष(cid:14) 2011-12 के दौरान उ(cid:29)प ादन िववरण नीचे 9दया गया ह ै :178 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ततततााााििििललललककककाााा 8888....2222 2222000011111111----11112222 ककककेेेे ददददौौौौरररराााानननन ऊऊऊऊजजजजाााा !! !!उउउउ####सस सस जजजजनन!!नन!! हाइ[ो ((((बीयू)))) थम(cid:14)ल ((((बीयू)))) परमाणु ((((बीयू)))) आआआआररररईईईईएएएएसससस**** ((((बीयू)))) कुल ((((बीयू)))) 136 (14.7%) 708 (76.3%) 32 (3.4%) 52(5.6%) 929(100%) चचचचााााटटटट!! !! 8888....2222 ऐसा दखे ा जा सकता ह ै 9क (cid:17)थ ािपत Bमता म7 अपिशRट dधन क(cid:11) िह(cid:17)स ेदारी 66% ह ै जब9क ऊजा (cid:14) उ(cid:29)प ादन म 7 इसक(cid:11) िह(cid:17)स ेदारी 76% ह ै जो यह दशा(cid:14)ता ह ै 9क अपिशRट dधन Bमता उ5च तर पीएलएफ पर &चािलत क(cid:11) जाती रही ह ै और इस &कार इसक(cid:11) उ(cid:29)प ादन म7 िह(cid:17)स ेदारी अिधक ह।ै अत: यह कहा जा सकता ह ै 9क अपिशRट dधन पर आधाOरत िव(cid:3)ुत उ(cid:29)प ादन भारतीय िव(cid:3)ुत BेG क(cid:11) रीढ़ ह।ै 8888....333311111111वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा अअअअििििभभभभववववििृृििृृ ???? 11वP योजना अविध (2007-2012) के दौरान योजना आयोग ने 78,700 मेगावाट Bमता अिभवृिH का लLय िनधा(cid:14)Oरत 9कया था, िजसम7 15,627 मेगावाट हाइ[ो, 59693 मेगावाट थम(cid:14)ल और 33,80 मेगावाट नयूि*लयर &ोजे*ट शािमल ह।- इसे ततततााााििििललललककककाााा 8888....3333 म7 संिBJत 4प से दशा(cid:14)या गया ह।ै¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 179 ततततााााििििललललककककाााा 8888....3333 (cid:26)(cid:26)(cid:26)(cid:26)(cid:27)(cid:27)ेे(cid:27)(cid:27)ेे हहहहााााइइइइAAAAोोोो थथथथममममलल!!लल!! NNNNuuuucccclllleeeeaaaarrrr TTTToooottttaaaallll कोयला गैस डीजल जोड़ ररररााााBBBBयय यय 3482.0 19985.0 3316.4 0.0 23301.4 0.0 22226666777788883333....4444 ििििननननजजजजीीीी 3491.0 9515.0 2037.0 0.0 11552.0 0.0 11115555000044443333....0000 ककककेेेेCCCCDD DD ीीीीयययय 8654.0 23350.0 1490.0 0.0 24840.0 3380.0 33336666888877774444....0000 जजजजोोोोड़ड़ड़ड़ 11115555666622227777....0000 55552222888855550000....0000 6666888844443333....4444 0000....0000 55559999666699993333....4444 3333333388880000....0000 77778888777700000000....4444 मQय ाविध समीBा के अनुसार 11वP योजना अविध के दौरान संभािवत Bमता अिभवृिH लगभग 62,374 मेगावाट थी। 11वP योजना के दौरान 54,964 मेगावाट Bमता (cid:17)थ ािपत क(cid:11) गई। 11वP योजना के दौरान Bमता अिभवृिH के मQय ाविध लLय का dधनवार िववरण : ततततााााििििललललककककाााा 8888....4444 (cid:26)(cid:26)(cid:26)(cid:26)(cid:27)(cid:27)ेे(cid:27)(cid:27)ेे हहहहााााइइइइAAAAोोोो थथथथममममलल!!लल!! पपपपररररममममााााणणणण ुु ुु जजजजोोोोड़ड़ड़ड़ ((((ममममगगेेगगेे ााााववववााााटटटट)))) केTe ीय 2922 14920 3380 21222 रा/य 2854 18501 0 21355 िनजी 2461 17336 0 19797 जजजजोोोोड़ड़ड़ड़ 8888222233337777 55550000777755557777 3333333388880000 66662222333377774444 ((((11113333....2222%%%%)))) ((((88881111....4444%%%%)))) ((((5555....4444%%%%)))) ((((111100000000)))) ततततााााििििललललककककाााा 8888....4444 ((((कककक)))) (cid:26)(cid:26)(cid:26)(cid:26)(cid:27)(cid:27)ेे(cid:27)(cid:27)ेे हहहहााााइइइइAAAAोोोो थथथथममममलल!!लल!! पपपपररररममममााााणणणण ुु ुु जजजजोोोोड़ड़ड़ड़ ((((ममममगगेेगगेे ााााववववााााटटटट)))) केTe ीय 1550 12790 880 15220 रा/य 2702 14030 0 16732 िनजी 1292 21720 0 23012 जजजजोोोोड़ड़ड़ड़ 5555555544444444 44448888555544440000 888888880000 55554444999966664444 ((((11110000....1111%%%%)))) ((((88888888....3333%%%%)))) ((((1111....6666%%%%)))) ((((111100000000))))180 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 8888....4444 उउउउ####सस सस जजजजनन!!नन!! घघघघटटटटकककक ((((CCCCOOOO2222 ककककाााा ((((ककककललललोोोोFFFFाााामममम////((((ककककललललोोोोववववााााटटटट घघघघटटंंटटंं ाााा)))) वष(cid:14) 2010-11 के दौरान वा(cid:17)त िवक आंकड़; के अनसु ार उ(cid:29)प ादन के िविभTन &कारवार dधन का भाOरत औसत उ(cid:29)स ज(cid:14)न (टन CCCCOOOO2222/मेगावाट घंटा) और नवीनतम &ौ(cid:3)ोिगक(cid:11) के &योग स े यथासंभव आंकड़ े नीच े तािलका 8.5 म 7 दशा(cid:14)ए गए ह।- ततततााााििििललललककककाााा 8888....5555 GGGGधधधधननननववववाााारररर भभभभााााIIIIररररतततत औऔऔऔससससतततत उउउउ####सस सस जजजजनन!!नन!! ((((टटटटनननन CCCCOOOO2222////ममममगगेेगगेे ााााववववााााटटटट घघघघटटंंटटंं ाााा)))) **** GGGGधधधधनननन 2222000011110000----11111111 ककककेेेे ददददौौौौरररराााानननन ननननववववीीीीननननततततमममम &&&&ौौौौ(cid:25)(cid:25)(cid:25)(cid:25)ोोोोििििगगगगकककक++++ ककककेेेे &&&&ययययोोोोगगगग सससस ेे ेे ककककोोोोययययललललाााा 1.06 0.88 (ससससपपुुपपुु रररर ((((KKKKIIIIटटटटककककलललल एएएएचचचचआआआआरररर 2326) गगगगससैैससैै 0.44 0.34 (ससससीीीीससससीीीीजजजजीीीीटटटटीीीी η - 53%) 0.25 (ससससीीीीससससीीीीएएएएचचचचपपपपीीीी η - 70%) ऑऑऑऑययययलललल 0.64 डडडडीीीीजजजजीीीी ससससटटेेटटेे 0.55 बबबबााााययययोोोोममममाााासससस Co2 CCCCयय य य LLूूLLूू लललल Co2 CCCCयय यय ूूLLूLूLलललल * िनवल उ(cid:29)प ादन पर पOर किलत मू_य कुल उ(cid:29)प ादन के आधार पर भारतीय िव(cid:3)ुत BेG के िलए वष(cid:14) 2011-12 अथा(cid:14)त 11वP योजना के अंितम वष(cid:14) तक काब(cid:14)न डाईऑ*स ाइड (CO2) का वा(cid:17)त व9क उ(cid:29)स ज(cid:14)न घटक और अिधकतम उ(cid:29)स जन(cid:14) चाट(cid:14) 8.3 म7 9दया गया ह।ै चचचचााााटटटट!! !! 8888....3333 यह दखे ा जा सकता ह ै 9क CO2 के उ(cid:29)स ज(cid:14)न म7 वृिH के बावजूद भी िपछले कुछ वषV के दौरान उ(cid:29)स ज(cid:14)न घटक म 7 कमी आई ह।ै¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 181 8888....5555 ििििवववव(cid:25)(cid:25)(cid:25)(cid:25)ततततुुुु ऊऊऊऊजजजजाााा !! !! आआआआवववव----यय यय ककककतततताााा ककककाााा पपपपववूूववूू ाााानन!!नन!! ममुुममुु ाााानननन 18वP ईपीएस Oरपोट(cid:14) के अनुसार 12वP और 13वP पंचवषhय योजना के अंत तक िव(cid:3)ुत ऊजा(cid:14) क(cid:11) आव"य कता चचचचााााटटटट!! !! 8888....4444 म7 दशा(cid:14)ई गई ह।ै चचचचााााटटटट!! !! 8888....4444 18th EPS Demand Projections 1904 2000 1600 1354 1200 969 831 800 400 0 2009-10 Actual 2011-12 11Plan 2016-17 12th 2021-22 13th End Plan End Plan End )UB( tnemeriuqeR ygrenE ER BU उ(cid:29)स ज(cid:14)न को यथा (cid:15)य वहाय(cid:14) सीमा तक कम रखते Iए 12वP और 13वP योजना के दौरान दशे क(cid:11) िव(cid:3)ुत मांग को पूरा करने के िलए उ(cid:29)प ादन आयोजना म7 कम काब(cid:14)न उ(cid:29)स ज(cid:14)न रणनीित अपनाई गई ह ै इसके िववरण संBेप म7 नीच े 9दए गए ह।- 8888....6666ककककमममम ककककााााबबबबनन!!नन!! उउउउ####सस सस जजजजनन!!नन!! ररररणणणणननननीीीीिििितततत 12वP और 13वP पंचवषhय योजना के दौरान कम काबन(cid:14) उ(cid:29)स जन(cid:14) सुिनि?त करने के िलए िनXन िलिखत उपाय; पर िवचार 9कया जा रहा ह।ै ((((iiii)))) हहहहााााइइइइAAAAोोोो पपपपााााववववरररर ििििववववककककाााासससस ककककोोोो बबबबढ़ढ़ढ़ढ़ााााववववाााा ददददननननेेेे ाााा जल िव(cid:3)ुत पOरयोजना6 के िवकास म7 आयोजना से (cid:17)थ ापना तक बIत अिधक समय लगता ह ै अत: जल िव(cid:3)ुत पOरयोजना6 क(cid:11) अिNम आयोजना आव"य क ह।ै केTe ीय िव(cid:3)ुत &ािधकरण न े िसतंबर, 2008 म7 12वP पंचवषhय योजना के िलए जल िव(cid:3)ुत िवकास योजना तैयार क(cid:11) ह।ै 12वP पंचवषhय योजना के दौरान Bमता अिभवृिH के िलए िचिiनत क(cid:11) गइ पOरयोजना6 के संदभ(cid:14) म7 समय पर सांिविधक (cid:17)व ीकृितयां सुिनि?त करन े के िलए हरसंभव &यास 9कए गए और 11वP योजना अविध म7 ही मुjय पकै ेज; के िलए आदशे &(cid:17)त ुत करने का &यास 9कया गया ता9क 12वP पंचवषhय योजना के दौरान पOरयोजना6 का &चालन शु4 9कया जा सके। जल और जल िव(cid:3)ुत रा/य के अिधकार BेG म7 आने वाला िवषय ह।ै काफ(cid:11) संjय ा म7 जल िव(cid:3)ुत पOरयोजना (cid:17)थ ल; का िवकास साव(cid:14)जिनक और िनजी कंपिनय; को सkपा गया ह।ै ये पOरयोजनाए ं 11वP और 12वP पंचवषhय योजना6 के दौरान (cid:17)थ ािपत होने क(cid:11) संभावना ह।ै केTe ीय िव(cid:3)ुत &ािधकरण सवl और अTव ेषण क(cid:11) &गित क(cid:11) िनगरानी कर रहा ह ै और िवकासकता(cid:14)6 के समTव य स े इन पOरयोजना6 के िनमा(cid:14)ण तथा िव(cid:17)त ृत पOरयोजना Oरपोट(cid:14) तैयार करन े क(cid:11) 9दशा म7 भी यथासंभव समTव य और सहयोग कर रहा ह।ै िविभTन जल िव(cid:3)ुत पOरयोजना6 क(cid:11) ि(cid:17)थित के आधार पर ऐसा अनुमान ह ै 9क 12वP पंचवषhय योजना के दौरान लगभग 10,897 मेगावाट Bमता (cid:17)थ ािपत हो जाएगी। जल िव(cid:3)ुत पOरयोजना6 के अंतKनिहत लाभ; को182 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Qय ान म7 रखते Iए आयोजना कार(cid:14)वाई म7 अिनवाय(cid:14) 4प स े संचािलत क(cid:11) जान े वाली पOरयोजना6 के 4प म7 माना गया ह।ै ((((iiiiiiii)))) ससससौौौौरररर ििििवववव(cid:25)(cid:25)(cid:25)(cid:25)ततुुततुु ससससििििहहहहतततत ननननववववीीीीककककररररणणणणीीीीयययय ऊऊऊऊजजजजाााा !! !!ककककोोोो बबबबढ़ढ़ढ़ढ़ााााववववाााा ददददननननेेेे ाााा संगत रा/य ; के िलए िविभTन रा/य िव(cid:3)ुत िनयामक आयोग; (एसईआरसी) aारा नवीकरणीय खरीद बाQय ताए ं (आरपीओ) अिधसूिचत क(cid:11) गई ह।- नवीकरणीय खरीद बाQय ता (आरपीओ) एक ऐसी बाQय ता ह ै िजसके अंतगत(cid:14) रा/य िव(cid:3)ुत िनयामक आयोग (एसईआरसी) aारा अिधिनयम के तहत िवतरण लाइस7सधारक के BेG म7 कुल खपत म7 से नवीकरणीय ऊजा(cid:14) के Tय ूनतम (cid:17)त र क(cid:11) खरीद हते ु उसे अिधदिे शत 9कया जाता ह।ै नवीकरणीय उ(cid:29)प ादन के िविभTन &कार; के िलए रा/य िव(cid:3)ुत िनयामक आयोग; aारा और नवीकरणीय ऊजा(cid:14) के िलए केTe ीय िव(cid:3)ुत िनयामक आयोग aारा टैOरफ अिधसूिचत 9कए जाते ह।- केTe ीय िव(cid:3)ुत िनयामक आयोग aारा नवीकरणीय ऊजा(cid:14) के &योग को बढ़ावा दने े के िलए नवीकरणीय ऊजा(cid:14) &माण पG (आरईसी) तंG &(cid:17)त ािवत 9कया गया ह।ै आरईसी एक बाजार आधाOरत िलखत ह ै जो नवीकरणीय ऊजा(cid:14) को बढ़ावा दने े और नवीकरणीय ऊजा(cid:14) खरीद बाQय ता (आरपीओ) को सुकर बनाने के िलए जारी 9कया जाता ह।ै आरईसी तंG का उZ"े य रा/य म7 नवीकरणीय ऊजा(cid:14) संसाधन; क(cid:11) उपल+ध ता और नवीकरणीय खरीद बाQय ता (आरपीओ) को पूरा करने के िलए बाQय संगठन; क(cid:11) आव"य कता के बीच अंतर को दरू करना ह।ै जवाहर लाल नेह4 राRS ीय सौर िमशन भारत क(cid:11) ऊजा(cid:14) सुरBा चुनौती का समाधान करने के िलए पाOरि(cid:17)थितक(cid:11)य दिृ n स े (cid:17)थ ायी वृिH को बढ़ावा दने े हते ु भारत सरकार का एक मह(cid:29)व पूण(cid:14) &यास ह।ै यह जलवाय ु पOरवत(cid:14)न क(cid:11) चनु ौितय; का सामना करने के िलए वैिoक (cid:17)त र पर 9कए जा रह े &यास; म7 भारत क(cid:11) ओर से भी एक बड़ा योगदान दगे ा और सौर िव(cid:3)तु से भारत म 7 उपल+ध (cid:15)य ापक नवीकरणीय संभावना6 को साकार बनाएगा। िव(cid:3)ुत मंGालय और नवीन तथा नवीकरणीय ऊजा(cid:14) मंGालय 2013 तक एनवीवीएनएल के जOरए कुल 1000 मेगावाट Bमता वाली सौर पOरयोजना6, िजनम7 काय(cid:14)Uम के &थम चरण के अतं ग(cid:14)त 2013 तक 200 मेगावाट 4फ टॉप सौर पOरयोजनाए ं शािमल ह,- के िवकास हते ु रणनीितय; को अंितम 4प द े रह े ह।- इसके अलावा रा/य िव(cid:3)ुत िनयामक आयोग सौर ऊजा(cid:14) के संदभ(cid:14) म7 आरपीओ िविनpदRट कर7गे तथा िव(cid:3)तु मंGालय को राRS ीय िव(cid:3)ुत नीित/टैOरफ नीित म7 आव"य क संशोधन करने ह।- राRS ीय सौर िमशन का एक उZ"े य वष(cid:14) 2022 तक 20,00 मेगावाट सौर पावर के िवकास हते ु समथक(cid:14) ारी नीितगत ढांचा तैयार करना ह।ै ((((iiiiiiiiiiii)))) ननननएएएए गगगगससैैससैै आआआआधधधधााााIIIIररररतततत उउउउ####पप पप ााााददददनननन ककककोोोो बबबबढ़ढ़ढ़ढ़ााााववववाााा ददददननननेेेे ाााा िव(cid:3)ुत क(cid:11) बढ़ रही मांग को पूरा करन े और CO2 के उ(cid:29)स ज(cid:14)न को कम करने के उZ"े य स े दशे म7 गैस आधाOरत उ(cid:29)प ादन Bमता िवकिसत करन े क(cid:11) आव"य कता ह।ै पया(cid:14)वरण क(cid:11) दिृ n स े अनुकूल होने के अलावा गसै आधाOरत पOरयोजना6 क(cid:11) उ5च दBता, कम पूव(cid:14) िनमा(cid:14)ण अविध, कम पूंजीगत लागत होती ह ै और इनके िलए भूिम तथा जल क(cid:11) कम आव"य कता होती ह।ै गैस आधाOरत पOरयोजनाएं आदश(cid:14) 4प से पीक आव"य कता6 को पूरा करन े के िलए उपयु*त ह।- केTe ीय िव(cid:3)ुत &ािधकरण ने 12वP योजना के िलए िनXन िलिखत अितOर*त आव"य कता का पहले ही अनुमान लगाया ह।ै गैस आधाOरत लचीली पीqकग Bमता6 को जोड़न े स े कोयला आधाOरत Jल ांट; क(cid:11) बैqकग डाउन भी कम होगी और CO2 का उ(cid:29)स ज(cid:14)न भी तलु ना(cid:29)म क 4प स े कम होगा।¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 183 ततततााााििििललललककककाााा 8888....6666 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ििििललललएएएए अअअअििििततततIIIIररररNNNNतत तत गगगगससैैससैै आआआआवववव----यय यय ककककतततताााा ििििववववववववररररणणणण गगगगससैैससैै (cid:5)(cid:5)(cid:5)(cid:5)ममममतततताााा पपपपीीीीएएएएललललएएएएफफफफ पपपपरररर गगगगससैैससैै कककक(cid:20)(cid:20)(cid:20)(cid:20) आआआआवववव(cid:22)(cid:22)(cid:22)(cid:22)यय यय ककककतततताााा 77770000%%%% ममममगगेेगगेे ााााववववााााटटटट मममम (cid:12)(cid:12) (cid:12)(cid:12) एएएएममममएएएएममममएएएएससससससससीीीीएएएएममममडडडडीीीी (((( )))) ससससीीीीससससीीीीएएएएचचचचपपपपीीीी (cid:7)(cid:7)(cid:7)(cid:7)ममममतततताााा 2,000 8888....0000 (cid:11)(cid:11)(cid:11)(cid:11)ााााउउउउनननन फफफफ(cid:15)(cid:15)(cid:15)(cid:15)(cid:16)(cid:16)(cid:16)(cid:16)डड डड (cid:18)(cid:18)(cid:18)(cid:18)थथ थथ लललल(cid:21)(cid:21)(cid:21)(cid:21) अअअअथथथथववववाााा (cid:24)(cid:24)(cid:24)(cid:24)ीीीीनननन फफफफ(cid:15)(cid:15)(cid:15)(cid:15)(cid:16)(cid:16)(cid:16)(cid:16)डड डड (cid:18)(cid:18)(cid:18)(cid:18)थथ थथ लललल(cid:21)(cid:21)(cid:21)(cid:21) मममम (cid:25)(cid:25) (cid:25)(cid:25) गगगगससैैससैै 21,000 77778888....0000 आआआआधधधधाााा(cid:30)(cid:30)(cid:30)(cid:30)ररररतततत (cid:7)(cid:7)(cid:7)(cid:7)ममममतततताााा ककककोोोो शशशशााााििििममममलललल ककककररररतततत ेे ेे%%%%एएएए बबबबड़ड़ड़ड़ ेे ेे शशशशहहहहरररर(cid:21)(cid:21)(cid:21)(cid:21) ककककेेेे आआआआससससपपपपाााासससस अअअअवववविििि(cid:18)(cid:18)(cid:18)(cid:18)थथथथिििितततत पपपपीीीी))))ककककगगगग गगगगससैैससैै आआआआधधधधाााा(cid:30)(cid:30)(cid:30)(cid:30)ररररतततत 2,000 4444....0000 **** (cid:7)(cid:7)(cid:7)(cid:7)ममममतततताााा जजजजोोोोड़ड़ड़ड़ 22225555,,,,000000000000 99990000....0000 पीक लोड के िलए और आकि(cid:14)मक ि(cid:14)थितय(cid:19) म(cid:20) (cid:21)ित(cid:22)दन लगभग 5-6 घंटे (cid:21)चालन हते ु * हालां9क अभी हाल ही म7 केजी बेिसन से गैस का उ(cid:29)प ादन घटने क(cid:11) बात को Qय ान म7 रखते Iए, यहां तक 9क आवंOटत गैस क(cid:11) िनधा(cid:14)Oरत माGा क(cid:11) आपूKत भी पावर Jल ांट; को नहP क(cid:11) जा रही ह ै और दशे को बIत बड़ी उ(cid:29)प ादन हािन हो रही ह।ै /य ादातर पावर Jल ांट कम पीएलफ पर &चािलत 9कए जा रह े ह - और कुछ पावर Jल ांट गैस क(cid:11) अनुपल+ध ता के कारण बंद पड़ े Iए ह।- वत(cid:14)मान म 7 दशे म7 लगभग 13,000 मेगावाट गैस आधाOरत Bमता िविभTन चरण; पर िनमा(cid:14)णाधीन ह।- परंतु वत(cid:14)मान म7 नए पावर Jल ांट; को गैस क(cid:11) अनुपल+ध ता दशे म7 गैस पावर Jल ांट के िवकास म 7 गंभीर बाधा बनी Iई ह।ै भारत म7 नए गैस आधाOरत उ(cid:29)प ादन को बढ़ावा दने े के िलए उिचत नीितगत सहयोग के साथ आरएलएनजी का आयात आव"य क ह।ै ((((iiiivvvv)))) अअअअििििननननववववाााायययय !! !! CCCCयय यय ननूूननूू ततततमममम दददद(cid:26)(cid:26)(cid:26)(cid:26)तततताााा ''''तत तत रररर ददददशशशशाााातत!!तत!! ेे ेेPPPPएएएए पपपपााााववववरररर QQQQलल लल ााााटटंंटटंं **** ककककेेेे ििििननननममममााााणण!!णण!! पपपपरररर ससससीीीीईईईईएएएए ििििववववििििननननययययमममम कककक++++ अअअअििििधधधधससससचचूूचचूू ननननाााा इलेि*Sकल Jल ांट और लाइन; के िनमा(cid:14)ण हते ु सीईए के तकनीक(cid:11) िविनयम अग(cid:17)त , 2010 म7 अिधसूिचत 9कए गए ह।- इन िविनयम; म7 पावर Jल ांट; और पारेषण उप(cid:17)क र; के अिनवाय(cid:14) Tय ूनतम दBता (cid:17)त र दशा(cid:14)ए गए ह।- ((((vvvv)))) पपपपररुुररुु ााााननननीीीी औऔऔऔरररर अअअअदददद(cid:26)(cid:26)(cid:26)(cid:26) ककककोोोोययययललललाााा आआआआधधधधााााIIIIररररतततत उउउउ####पप पप ााााददददनननन ययययििूूििूू ननननटटटट**** ककककोोोो बबबबंदंदंदंद ककककररररननननाााा पुराने और अदB थम(cid:14)ल पावर Jल ांट; को बंद करके नए और अिधक दB पावर Jल ांट लगाने से dधन का &भावी ढंग से सदपु योग सुिनि?त होगा साथ ही जीएचजी उ(cid:29)स ज(cid:14)न को कम 9कया जा सकेगा। 11वP योजना के दौरान 1500 मेगावाट Bमता वाली पुरानी यूिनट; को बंद 9कया गया। इसम7 100 मेगावाट से कम Bमता वाली कोयला और िलrन ाइट आधाOरत यूिनट7 शािमल ह।- 12 एव ं 13वP पंचवषhय योजना6 के दौरान लगभग 4,000 मेगावाट Bमता वाली यूिनट; को बंद करन े का &(cid:17)त ाव ह,ै िजसम7 100 मेगावाट से कम Bमता वाली कोयला और िलrन ाइट आधाOरत शेष बची यूिनट7, 30 वष (cid:14) से अिधक पुरान े (1987 और उससे पहले) गैस आधाOरत Jल ांट और 110 मेगावाट Bमता वाली कुछ कोयला आधाOरत यूिनट7 शािमल ह।- ((((vvvviiii)))) ररररााााRRRRLL LL ीीीीयययय दददद(cid:26)(cid:26)(cid:26)(cid:26)तततताााा अअअअििििभभभभववववििृृििृृ ???? ननननववववीीीीननननीीीीककककररररणणणण औऔऔऔरररर आआआआधधधधििुुििुु ननननकककक++++ककककररररणणणण ककककााााययययKK!!KK!! मममम ककककाााा ककककााााययययााााCC!!CC!! वव वव ययययनननन केTe ीय िव(cid:3)ुत &ािधकरण न े 11वP और 12वP योजना के दौरान काया(cid:14)Tव यन हते ु एक राRS ीय दBता अिभवृिH, नवीकरण और आधुिनक(cid:11)करण काय(cid:14)Uम पहले ही तैयार कर िलया ह।ै इसम7 11वP योजना के दौरान 18,965 मेगावाट और 12वP योजना के दौरान 4,971 मेगावाट Bमता का नवीनीकरण और आधुिनक(cid:11)करण शािमल ह।ै मौजूदा पुराने पावर (cid:17)ट ेशन; के नवीनीकरण और आधुिनक(cid:11)करण (आर एsड एम) और जीवन िव(cid:17)त ार (एलई) स े अ_प पूव(cid:14) िनमा(cid:14)ण अविध म7 कम लागत पर अितOर*त उ(cid:29)प ादन का अवसर &ाJत होता ह।ै उ(cid:29) पादन म7 सुधार के अलावा पया(cid:14)वरणीय उ(cid:29)स ज(cid:14)न म7 सुधार होता ह ै और िव(cid:3)ुत क(cid:11) उपल+ध ता, सरु Bा और िव"व सनीयता भी बढ़ती ह।ै रा/य ; को &ो(cid:29)स ािहत करने के िलए नवीनीकरण और आधुिनक(cid:11)करण के िलए शटडाउन से ठीक पहले यूिनट के184 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] उ(cid:29)प ादन के 50% भाग क(cid:11) BितपूKत शटडाउन क(cid:11) सामाTय अविध के दौरान अनावंOटत कोटा से अितOर*त आवंटन के जOरए क(cid:11) जाए। उTन त दBता आधाOरत नवीनीकरण और आधुिनक(cid:11)करण के िलए कम +य ाज दर पर िव(cid:29)त ीय सहायता &दान करने क(cid:11) शुtआत क(cid:11) गई ह।ै ((((vvvviiiiiiii)))) ''''वव वव SSSSछछ छछ ककककोोोोययययललललाााा &&&&ौौौौ(cid:25)(cid:25)(cid:25)(cid:25)ोोोोििििगगगगकककक++++ ककककोोोो अअअअगगंंगगंं ीीीीककककाााारररर ककककररररननननाााा कम काब(cid:14)न उ(cid:29)स ज(cid:14)न रणनीित के अनुसार भावी योजना6 के िलए (cid:17)व 5छ कोयला &ौ(cid:3)ोिगक(cid:11) को अपनाया जा रहा ह,ै िजसम7 सुपर 9UOटकल यूिनट; को बढ़ाना, आईजीसीसी, सीएफबीसी &ौ(cid:3)ोिगक(cid:11) को बढ़ावा दने ा शािमल ह।ै 12वP योजना के दौरान 35% कोयला आधाOरत Bमता क(cid:11) योजना सुपर 9UOटकल आधार पर तैयार क(cid:11) जा रही ह ै और 13वP योजना म7 यह &(cid:17)त ाव 9कया गया ह ै 9क संपूण(cid:14) कोयला आधाOरत Bमता केवल सुपर 9UOटकल &ौ(cid:3)ोिगक(cid:11) आधार पर (cid:17)थ ािपत क(cid:11) जाए। इस संदभ(cid:14) म7 िनXन िलिखत कार(cid:14)वाई क(cid:11) गई/9कए जाने क(cid:11) आव"य कता ह:ै ककककाााारररर!!!!ववववााााईईईई:::: कककक) सुपर 9UOटकल उप(cid:17)क र; के िलए (cid:17)व दशे ी िविनमा(cid:14)ण Bमता का सृजन ख)))) सुपर 9UOटकल &ौ(cid:3)ोिगक(cid:11) का अंतरण सुिनि?त करन े के िलए (cid:17)व दशे ी िविनमा(cid:14)ता6 को &ो(cid:29)स ािहत करना ग)))) जारी अिनवाय(cid:14) (cid:17)व दशे ी िविनमा(cid:14)ण के साथ 11x666666660000 मेगावाट सुपर 9UOटकल यूिनट; के िलए एक सामूिहक िनिवदा &9Uया। 660 मेगावाट के िलए आदशे ; को अंितम 4प दने े के प"च ात शीu ही 800 मेगावाट Bमता वाली यूिनट; के िलए सामूिहक िनिवदा &9Uया शु4 क(cid:11) जाए। घ)))) (cid:17)व दशे ी िविनमा(cid:14)ता6 के साथ परामश(cid:14) से अिनवाय(cid:14) (cid:17)व दशे ी िविनमा(cid:14)ण सुिवधा6 के साथ अ_S ा सुपर 9UOटकल &ौ(cid:3)ोिगक(cid:11) पर आधाOरत पOरयोजना6 के िलए सामूिहक िनिवदा &9Uया शु4 क(cid:11) जाए। ङ)))) पया(cid:14)वरण और वन मंGालय को सलाह दी जाए 9क वह 1.4.2012 से सब 9UOटकल &ौ(cid:3)ोिगक(cid:11) पर आधाOरत कोई भी कोयला आधाOरत पOरयोजना को (cid:17)व ीकृित &दान न करे। 13वP योजना के दौरान सब-9UOटकल Jल ांट; के िलए कोयला संपक(cid:14) (cid:17)थ ािपत न 9कए जाए।ं च)))) यह &स् ताव 9कया जाता ह ै 9क सुपर 9UOटकल Jल ांट; पर कोई सीमा शु_क और उ(cid:29)प ाद शु_क लागू नहP होना चािहए अथा(cid:14)त मेगा पावर पOरयोजना6 क(cid:11) तरह उ(cid:29)प ाद शु_क और सीमा शु_क क(cid:11) छूट इनके िलए भी &दान क(cid:11) जाए। (viii) CCCCयय य य ििूूििूू NNNNललललययययरररर ििििवववव(cid:25)(cid:25)(cid:25)(cid:25)ततुुततुु उउउउ####पप पप ााााददददनननन दशे म7 &ाकृितक यूरेिनयम क(cid:11) सीिमत उपल+ध ता के िलए Tय ूि*लयर उ(cid:29)प ादन भी सीिमत ह।ै परमाणु ऊजा (cid:14) िवभाग ने दशे म7 वष(cid:14) 2020 तक 20,000 मेगावाट क(cid:11) (cid:17)थ ािपत Tय ूि*लयर पावर Bमता िवकिसत करने क(cid:11) योजना बनाई ह।ै आज क(cid:11) ि(cid:17)थित के अनसु ार, (cid:17)व दशे ी dधन पर आधाOरत &थम चरण का काय(cid:14)Uम &गित पर ह ै और यह पOरप*व (cid:17)त र तक पIचं गया ह।ै 500 एमड+_ य ूई पीएफबीआर (&ोटोटाइप फा(cid:17)ट िwडर Oरये*ट र) के िनमा(cid:14)ण के साथ दसू रे चरण के काय(cid:14)Uम का भी आगाज कर 9दया गया ह।ै ऐसी आशा क(cid:11) जाती ह ै 9क वष(cid:14) 2020 तक 500 एमड+_ य ूई या उससे अिधक Bमता वाली चार नयी यूिनट7 (cid:17)थ ािपत क(cid:11) जाएगं ी। त(cid:29)प "च ात बIत स े एफबीआर (cid:17)थ ािपत 9कय े जाएगं े। जब एफबीआर के जOरए उपयु*त सतर क(cid:11) Bमता (cid:17)थ ािपत हो जाती ह ै तो तृतीय चरण के जOरये िव(cid:3)तु उ(cid:29)प ादन के िलए थोOरयम का &योग शु4 9कया जाएगा और दीघा(cid:14)विध म7 इसका लाभ उठाया जाएगा।¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 185 य(cid:3)िप आगामी 15 वषV म7 Tय ूि*लयर ऊजा(cid:14) का योगदान कम ही रहगे ा, 9फर भी ऊजा (cid:14) क(cid:11) दिृ n से (cid:17)व यं म7 पया(cid:14)Jत (cid:17)त र पर यहx तक 9क कमजोर उ(cid:29)प ादन भी दीघा(cid:14)विध म7 लाभदायक िसH होगा और इससे हम7 यह संकेत िमलता ह ै 9क थोOरयम का &योग करते Iए Tय ूि*लयर पावर के िवकास क(cid:11) 9दशा म7 &यास 9कए जाने चािहए। परमाणु सहयोग पर यूएसए और भारत के बीच ‘123 करार’ पर ह(cid:17)त ाBर 9कये जाने और भारत को परमाण ु dधन क(cid:11) आपूKत के िलए एनएसजी से छूट &दान 9कये जाने के पOरणाम(cid:17)व 4प यह अपेBा क(cid:11) जाती ह ै 9क दशे म7 कुछ िमG दशे ; स े िवदशे ी &ौ(cid:3)ोिगक(cid:11) के साथ कुछ Tय ूि*लयर Jल ांट भारत म7 (cid:17)थ ािपत 9कए जाएगं े। भारत के िलए आयाितत परमाणु dधन और &ौ(cid:3)ोिगक(cid:11) क(cid:11) उपल+ध ता Tय ूि*लयर पावर Jल ांट; से (cid:29)व Oरत Bमता अिभवृिH म7 सहायक होगी। 11वP/12वP योजना6 के दौरान आयाितत &ौ(cid:3)ोिगक(cid:11) से Oरये*ट र; का िनमा(cid:14)ण शु4 9कए जाने स े यह अपेBा क(cid:11) जाती ह ै 9क 13वP योजना से आगे उनक(cid:11) (cid:17)थ ापना हो जाएगी। मेगा Bमता वाले Tय ूि*लयर पाकV के िवकास क(cid:11) भी अपेBा ह।ै एक(cid:11)कृत ऊजा(cid:14) नीित म7 नयिू *लयर Bमता अिभवृिH के दो पOरद"ृ य बताए गए ह,- िजसम7 िनXन Tय ूि*लयर पOरद"ृ य म7 लगभग 48,000 मेगावाट और उ5च Tय ूि*लयर पOरद"ृ य म7 68,000 मेगावाट Bमता अिभवृिH क(cid:11) पOरक_प ना वष(cid:14) 2031-32 तक क(cid:11) गई ह।ै ((((iiiixxxx)))) टटटटीीीी एएएएUUUUडड डड डडडडीीीी हहहहााााििििननननयययय**** ककककोोोो ककककमममम ककककररररनननन ेे ेेककककोोोो उउउउSSSSचच चच &&&&ााााथथथथििििममममककककतततताााा ददददीीीी जजजजााााएएएए अिखल भारतीय (cid:17)त र पर टी एsड डी हािनयां बIत अिधक अथा(cid:14)त 23.97% तक ह।- टी एsड डी हािनय; को कम करने के िलए आरएपीडीआरपी का काया(cid:14)Tव यन शु4 9कया गया ह,ै िजसस े 9क तकनीक(cid:11) और वािणि/यक हािनय; को कम 9कया जा सके। इस बात के मZने जर आरएपीडीआरपी के काया(cid:14)Tव यन को सवy5च &ाथिमकता दी जा रही ह।ै िवतरण BेG के िनज ीकरण/z7चाइजी िनयु*त करने जसै ी &9Uया6 को &ो(cid:29)स ािहत 9कया जाना चािहए *य ;9क इन उपाय; से एटी और सी हािनयां कम हो सकती ह।- ((((xxxx)))) बबबबीीीीईईईईईईईई ककककेेेे ककककााााययययKK!!KK!! मममम**** ककककाााा ककककााााययययााााCC!!CC!! वव वव ययययनननन ऊजा(cid:4) काय(cid:4)कुशलता (cid:12) यूरो (बीईई) ने िन(cid:17) निलिखत िववरण के अनुसार िव(cid:24)ुत ऊजा(cid:4) के द(cid:26) (cid:27)योग को बढ़ावा दने े के िलए ब!त से काय(cid:4)"म शु$ %कए ह ' : • रा/य ; म7 ईसीबीसी का कायाT(cid:14) व यन • नगर िनगम, कृिष और भवन; म7 डीएसएम • ऊजा(cid:14) क(cid:11) दिृ n स े संवेदनशील उ(cid:3)ोग; म7 ऊजा(cid:14) तीYता मानक; का &वत(cid:14)न और उ(cid:29)स ज(cid:14)न म 7 कमी िवषयक &माण पG; क(cid:11) SेDडग • सीएफएल बचत ल-प योजना • ईएससीओ के जOरए कृिष (एजीडीएसएम) पंप दBता सुधार • उपकरण; क(cid:11) लेबDलग • &ाथिमकता के आधार पर इनवट(cid:14)र; क(cid:11) लेबDलग ((((xxxxiiii)))) ककककोोोोलललल बबबबडडेेडडेे ििििममममथथथथननेेननेे ((((ससससीीीीबबबबीीीीएएएएमममम)))) ककककाााा ससससददददपपपपुुुु ययययोोोोगगगग भारत म7 सीबीएम, ऑयल और गैस ए*स Jल ोरेशन/उ(cid:29)प ादन समान 4प से कुछ BेG; जैसे केXब ी बेिसन (गुजरात), बाम(cid:14)र बेिसन (राज(cid:17)थ ान) और कावरे ी बेिसन (तिमलनाडु) म7 एक साथ मौजूद ह - जहा ं एक ही बेिसन BेG म7 सीबीएम, ऑयल और नेचुरल गैस उपल+ध ह।- जहां तक सीबीएम &चालन और ऑयल तथा गैस &चालन को Bैितज/ऊQव ा(cid:14)धर 4प से अलग करन े और उसक(cid:11) तकनीक(cid:11) (cid:15)य वहाय(cid:14)ता का संबंध ह ै तो यह एक सु(cid:17)थ ािपत तFय ह ै 9क दोन; &चालन; को एक साथ जारी रखा जा सकता ह।ै तथािप इस &यास म7 कुछ (cid:15) यापक 9दशािनदशl और &9Uया6 का अनुपालन 9कया जाना आव"य क ह।ै पेSोिलयम एवं &ाकृितक गैस मंGालय के अधीन महािनदशे क हाइ[ोकाब(cid:14)न सीबीएम के िलए नोडल एज7सी ह।ै आज क(cid:11) तारीख तक 26 +ल ॉक; का आवंटन कर 9दया गया ह।ै186 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 8888....7777 थथथथममममलल!!लल!! उउउउ####पप पप ााााददददनननन (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा ((((ककककोोोोययययललललाााा ििििलललल1111नन नन ााााइइइइटटटट औऔऔऔरररर गगगगससैैससैै आआआआधधधधााााIIIIररररतततत)))) कककक++++ दददद(cid:26)(cid:26)(cid:26)(cid:26)तततताााा मममम 66 66ससससधधुुधधुु ाााारररर सुपर 9UOटकल &ौ(cid:3)ोिगक(cid:11) लागू करन,े नई गैस आधाOरत Bमता (cid:17)थ ािपत करने और पुरानी यूिनट; को बंद करन े से 11वP, 12वP और 13वP योजना6 के अंत म7 थम(cid:14)ल दBता6 म7 नीचे दी गई तािलका 8.7 और चाट(cid:14) 8.5 म 7 दशा(cid:14)ए अनुसार वृिH अपेिBत ह::ै:: ततततााााििििललललककककाााा 8888....7777 ययययोोोोजजजजननननाााा ककककेेेे अअअअततंंततंं मममम (cid:13)(cid:13) (cid:13)(cid:13)थथथथममममलल(cid:15)(cid:15)लल(cid:15)(cid:15) (cid:17)(cid:17)(cid:17)(cid:17)ममममतततताााा थथथथममममलल(cid:15)(cid:15)लल(cid:15)(cid:15) दददद(cid:17)(cid:17)(cid:17)(cid:17)तततताााा ((((%%%%)))) 11110000वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे अअअअततंंततंं मममम 66 66 ((((ववववाााा''''तत तत ििििववववकककक)))) 84,812 33333333....88886666 11111111वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे अअअअततंंततंं मममम 66 66 ((((1111555500000000 ममममगगेेगगेे ााााववववााााटटटट बबबबददंंददंं 1,31,853 33335555....11113333 ((((ककककएएएए जजजजाााानननन ेे ेेसससस))ेे))ेे 11113333वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे अअअअततंंततंं मममम 66 66 ((((4444000000000000 ममममगगेेगगेे ााााववववााााटटटट)))) 1, 98,756 33335555....99994444 11113333वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे अअअअततंंततंं मममम 66 66 ((((4444000000000000 ममममगगेेगगेे ााााववववााााटटटट बबबबददंंददंं 2222,,,,55551111,,,,111155556666 33336666....99994444 ((((ककककएएएए जजजजाााानननन ेे ेेसससस))ेे))ेे चचचचााााटटटट!! !! 8888....5555 Efficiency of the Thermal capacity at the end of 10th, 11th, 12th and 13th Plans 38.0 36.94 37.0 35.94 36.0 35.13 35.0 34.0 33.0 32.44 32.0 31.0 30.0 End of 10th End of 11th End of 12th End of 13th Plan Plan(with Plan( with Plan( with retirement) retirement) retirement) )%( ycneiciffE lamrehT थम(cid:14)ल यूिनट; क(cid:11) दBता म7 इस वृिH के पOरणाम(cid:17)व 4प उ(cid:29)स ज(cid:14)न घटक भी कम होगा। इसके अलावा नीचे सूचीबH िविभTन पOरद"ृ य ; के अंतग(cid:14)त Tय ूि*लयर, हाइ[ो और नवीकरणीय संसाधन; से उ(cid:29)प ादन बढ़ने पर काब(cid:14)न उ(cid:29)स जन(cid:14) और कम होने क(cid:11) अपेBा ह।ै 8888....888811112222वववव(cid:7)(cid:7)(cid:7)(cid:7) एएएएवववव ंं ंं11113333वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा.... ककककेेेे ददददौौौौरररराााानननन आआआआवववव----यय यय कककक (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा अअअअििििभभभभववववििृृििृृ ???? 12वP और 13वP योजना अविध के दौरान Bमता अिभवृिH के िलए 4 पOरदयृ तैयार 9कए गए ह।- कम गैस के साथ सामाTय पOरद"ृ य ; के 4प म7 कारोबार और कम नवीकरणीय bोत पOरद"ृ य को आधारभतू मामल े के 4प म 7 िनधा(cid:14)Oरत 9कया गया ह।ै 12वP और 13वP योजना के दौरान आव"य क Bमता अिभवृिH क(cid:11) गणना ईजीईएएस सॉ{टवेयर मॉडल का &योग करते Iए 9कए गए आयोजना अQय यन; के पOरणाम; के आधार पर क(cid:11) गई ह।ै¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 187 चार अलग अलग पOरद"ृ य ; म7 हाइ[ो Bमता को 10,897 मेगावाट क(cid:11) (cid:15)य वहाय(cid:14) Bमता तक ही सीिमत रखा गया ह।ै पुरानी अदB यूिनट; को बंद करने पर भी Bमता अिभवृिH क(cid:11) तािलका म7 9दए अनुसार िवचार 9कया गया ह।ै ऐसा अनुमान ह ै 9क नवीकरणीय Bमता का &चालन 20% पीएलएफ पर 9कया जाएगा। अQय यन के पOरणाम; के आधार पर 12वP और 13वP योजना के दौरान आव"य क Bमता अिभवृिH का सारांश ततततााााििििललललककककाााा 8888....8888 और 8888....9999 म7 नीचे 9दया गया ह ै : 8888....8888 ततततााााििििललललककककाााा चचचचाााारररर (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा अअअअििििभभभभववववििृृििृृ ???? पपपपIIIIररररदददद----ृृृृ यय यय ---- 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा एएएएससससससससीीीी----1111 एएएएससससससससीीीी----2222 एएएएससससससससीीीी----3333 एएएएससससससससीीीी----4444 ककककमममम गगगगससैैससैै ककककमममम उउउउSSSSचच चच गगगगससैैससैै ककककमममम उउउउSSSSचच चच गगगगससैैससैै उउउउSSSSचच चच ककककमममम गगगगससैैससैै औऔऔऔरररर ननननववववीीीीककककररररणणणणीीीीयययय ननननववववीीीीककककररररणणणणीीीीयययय ननननववववीीीीककककररररणणणणीीीीयययय उउउउSSSSचच चच ;;;;ोोोोतततत ((((आआआआधधधधााााररररभभभभततूूततूू ;;;;ोोोोतततत ;;;;ोोोोतततत ननननववववीीीीककककररररणणणणीीीीयययय ममममााााममममललललाााा)))) ;;;;ोोोोतततत हहहहााााइइइइAAAAोोोो 10,897 10,897 10,897 10,897 CCCCयय य य ििूूििूू NNNNललललययययरररर 5,300 5,300 5,300 5,300 ननननववववीीीीककककररररणणणणीीीीयययय ;;;;ोोोोतततत ((((ससससौौौौरररर ऊऊऊऊजजजजाााा !! !! 14,500 14,500 20,000 20,000 ककककोोोो छछछछोोोोड़ड़ड़ड़ककककरररर)))) ससससौौौौरररर 4,000 4,000 10,000 10,000 पपपपररुुररुु ााााननननीीीी औऔऔऔरररर अअअअदददद(cid:26)(cid:26)(cid:26)(cid:26) ययययििूूििूू ननननटटटट**** ककककोोोो 4,000 4,000 4,000 4,000 बबबबंदंदंदंद ककककररररननननाााा गगगगससैैससैै 2,540 14,540 14,540 2,540 ककककोोोोययययललललाााा 68,363 56,363 53,163 64,363 ससससबबबब----((((KKKKIIIIटटटटककककलललल 43,443 31,443 28,243 39,443 ससससपपुुपपुु रररर ((((KKKKIIIIटटटटककककलललल 24,920 24,920 24,920 24,920 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ((((ककककुुुुलललल)))) ((((गगगगररैैररैै 87,100 87,100 83,900 83,100 पपपपााााररररंंंंपपपपIIIIररररकककक))))188 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ततततााााििििललललककककाााा 8888....9999 (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा अअअअििििभभभभववववििृृििृृ ???? पपपपIIIIररररदददद----ृृृृ यय यय –––– 11113333वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा एएएएससससससससीीीी----1111 एएएएससससससससीीीी----2222 एएएएससससससससीीीी----3333 एएएएससससससससीीीी----4444 ककककमममम गगगगससैैससैै ककककमममम उउउउSSSSचच चच गगगगससैैससैै ककककमममम उउउउSSSSचच चच गगगगससैैससैै उउउउSSSSचच चच ककककमममम गगगगससैैससैै औऔऔऔरररर ननननववववीीीीककककररररणणणणीीीीयययय ;;;;ोोोोतततत ननननववववीीीीककककररररणणणणीीीीयययय ;;;;ोोोोतततत ननननववववीीीीककककररररणणणणीीीीयययय ;;;;ोोोोतततत उउउउSSSSचच चच ((((आआआआधधधधााााररररभभभभततूूततूू ननननववववीीीीककककररररणणणणीीीीयययय ;;;;ोोोोतततत ममममााााममममललललाााा)))) हहहहााााइइइइAAAAोोोो 12,000 12,000 12,000 12,000 CCCCयय य य ििूूििूू NNNNललललययययरररर 18,000 18,000 18,000 18,000 ननननववववीीीीककककररररणणणणीीीीयययय ;;;;ोोोोतततत ((((ससससौौौौरररर 14,500 14,500 25,000 25,000 ऊऊऊऊजजजजाााा !! !!ककककोोोो छछछछोोोोड़ड़ड़ड़ककककरररर)))) ससससौौौौरररर 16,000 16,000 20,000 20,000 पपपपररुुररुु ााााननननीीीी औऔऔऔरररर अअअअदददद(cid:26)(cid:26)(cid:26)(cid:26) ययययििूूििूू ननननटटटट**** ककककोोोो 4000 4000 4000 4000 बबबबंदंदंदंद ककककररररननननाााा गगगगससैैससैै 0 13,000 13,000 0 ककककोोोोययययललललाााा 56,400 45,200 37,200 54,800 ससससबबबब----((((KKKKIIIIटटटटककककलललल 10,000 0 0 0 ससससपपुुपपुु रररर ((((KKKKIIIIटटटटककककलललल 46,400 45,200 37,200 54,800 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ((((ककककुुुुलललल)))) ((((गगगगररैैररैै 86,400 88,200 80,200 84,800 पपपपााााररररंंंंपपपपIIIIररररकककक)))) 8888....9999 11113333वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ((((2222000022221111----22222222)))) ककककेेेे अअअअततंंततंं ततततकककक उउउउ####सससस जजजजनन!!नन!! ककककेेेे पपपपववूूववूू ाााानन!!नन!! ममुुममुु ाााानननन नवीकरणीय bोत; सिहत &(cid:29)य ेक dधन से उ(cid:29)प ादन के आधार पर काब(cid:14)न फुटD&ट अथा(cid:14)त् उ(cid:29)स जन(cid:14) और उ(cid:29)स जन(cid:14) घटक तीYता क(cid:11) गणना 2004-05 को आधार वष(cid:14) मानते Iए क(cid:11) गई ह।ै शािमल क(cid:11) गई योजना6 के दौरान िव(cid:3)ुत उ(cid:29)प ादन वृिH और कुल उ(cid:29)प ादन से औसत उ(cid:29)स जन(cid:14) घटक चाट(cid:14) 8.6 म7 नीचे दशा(cid:14)ए गए ह:-¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 189 चचचचााााटटटट!! !! 8888....6666 ककककुुुुलललल उउउउ####पप पप ााााददददनननन सससस ेे ेेऔऔऔऔससससतततत उउउउ####सससस जजजजनन!!नन!! घघघघटटटटकककक ((((ककककेेेेजजजजीीीी////ककककेेेेडडडडXXXXYY YY यय यय एएूूएएूू चचचच)))) Average Emmission Factor From Total Generation (Kg/kWh) 0.8 0.78 0.744 0.741 0.715 0.706 0.7 0.703 0.694 0.656 0.644 0.641 0.630 0.6 End of 2004-05 End of 10th Plan End of 11th Plan End of 12th Plan End of 13th Plan (2006-07) (2011-12) (2016-17) (2021-22) Sc-1 Sc-2 Sc-3 Sc-4 ऐसा दखे ा जा सकता ह ै 9क ऊपर बताए गए िविभTन उपाय; के कारण वष(cid:14) 2004-5 के (cid:17)त र से चार पOरद"ृ य ; म7 13वP योजना के सीमांत वष(cid:14) (2021-22) तक औसत उ(cid:29)स ज(cid:14)न घटक म7 15-20% क(cid:11) कमी हो सकती ह।ै हालां9क िव(cid:3)ुत BेG के कुल उ(cid:29)स ज(cid:14)न म7 नीचे चाट(cid:14) 8.7 म7 दशा(cid:14)ए अनुसार वृिH होगी : चचचचााााटटटट!! !! 8888....7777 8888....11110000 ववववषषषष !! !!2222000000004444----5555 ककककेेेे ससससददंंददंं भभभभ !! !!मममम 66 66ििििवववव(cid:25)(cid:25)(cid:25)(cid:25)ततुुततुु (cid:26)(cid:26)(cid:26)(cid:26)(cid:27)(cid:27)ेे(cid:27)(cid:27)ेे ककककेेेे ििििललललएएएए उउउउ####सस सस जजजजनन!!नन!! ततततीीीीZZZZतततताााा ((((जजजजीीीीडडडडीीीीपपपपीीीी ककककेेेे &&&&िििितततत 11110000 [[[[.... ((((ककककललललोोोोFFFFाााामममम CCCCOOOO2222)))) मममम 6666 ककककममममीीीी ककककाााा अअअअननननममुुममुु ााााििििननननतततत &&&&ििििततततशशशशतततत वष(cid:14) 2021-22 के िलए िव(cid:3)ुत BेG के उ(cid:29)स ज(cid:14)न के आधार पर उ(cid:29)स ज(cid:14)न तीYता का मू_य ांकन करने के िलए वष (cid:14) 2007-08 तक जीडीपी का वा(cid:17)त िवक डटे ा केTe ीय सांिjयक(cid:11) संगठन क(cid:11) आKथक सवBl ण Oरपोट(cid:14) स े िलया गया ह ै और त(cid:29)प "च ात ् 8% सीएजीआर पर सभं ािवत डटे ा का &योग 9कया गया ह।ै िव(cid:3)ुत BेG उ(cid:29)स जन(cid:14) के आधार पर भारत क(cid:11) उ(cid:29)स ज(cid:14)न तीYता (CCCCOOOO2222 9कलोNाम &ित 10 t. जीडीपी) का सारांश तािलका 8.10 म7 नीचे 9दया गया ह ै :190 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ततततााााििििललललककककाााा 8888....11110000 ििििवववव(cid:25)(cid:25)(cid:25)(cid:25)ततुुततुु (cid:26)(cid:26)(cid:26)(cid:26)(cid:27)(cid:27)ेे(cid:27)(cid:27)ेे उउउउ####सस सस जजजजननन!!न!! ककककेेेे आआआआधधधधाााारररर पपपपरररर उउउउ####सस सस जजजजनन!!नन!! ततततीीीीZZZZतततताााा वष(cid:14) जीडीपी CO2 उ(cid:29)स ज(cid:14)न (एमटी) CCCCOOOO2222 9कलोNाम &ित 10 t. जीडीपी करोड़ tपए एससी- एससी- एससी- एससी- एससी- एससी- एससी- एससी- म7 1 2 3 4 1 2 3 4 2004- 2388768 462 462 462 462 0.193 0.193 0.193 0.193 05 2006- 2871118 495 495 495 495 0.172 0.172 0.172 0.172 07 2007- 3306735 521 521 521 521 0.158 0.158 0.158 0.158 08 2011- 4498776 749 749 749 749 0.166 0.166 0.166 0.166 12 2016- 6610178 1030 1013 1000 1018 0.156 0.153 0.152 0.154 17 2021- 9712521 1330 1306 1278 1299 0.137 0.134 0.132 0.134 22 8888....11111111 उपसंहार • थम(cid:14)ल दBता 10वP योजना के अंत (2006-07) तक 33.86% से बढ़कर 13वP योजना के अंत (2021- 22) तक 36.94% होने क(cid:11) उXम ीद ह।ै • कुल उ(cid:29)प ादन (नवीकरणीय bोत; सिहत) से औसत उ(cid:29)स ज(cid:14)न घटक म7 भी वष(cid:14) 2006-07 म7 0.744 क(cid:11) तुलना म7 2021-22 तक 0.656 क(cid:11) वा(cid:17)तिवक कमी होने क(cid:11) अपेBा ह।ै उपयु(cid:14)*त लाभ; का अनुमान लगाते समय आरएनएम जसै ी रणनीितय; के &भाव को 13वP योजना के िलए शािमल नहP 9कया गया ह।ै • उ(cid:29)प ादन और उपभो*त ा के (cid:17)त र पर आर एsड एम कायU(cid:14) म; के साथ----साथ ऊजा (cid:14) सरं Bण उपाय; म7 तेजी लाने के िलए &यास आव"य क ह।- नवीनतम &ौ(cid:3)ोिग9कय; िवशेष 4प से (cid:17)व 5छ कोयला &ौ(cid:3)ोिग9कय; को अपनाने पर िवशेष 4प से जोर 9दया जाना चािहए। • िव(cid:3)ुत BेG स े उ(cid:29)स ज(cid:14)न घटक (उ(cid:29)प ादन के &ित यूिनट CO2 ) को कम करना (cid:15)य वहाय(cid:14) ह ै और इसे 2005 क(cid:11) तुलना म7 2022 तक लगभग 15% तक कम 9कया जा सकता ह।ै वष(cid:14) 2004-5 के संदभ(cid:14) म7 11वP, 12वP और 13वP येाजना6 के अंत म7 सभी चार; पOरद"ृ य ; म7 उ(cid:29)स जन(cid:14) घटक (उ(cid:29)प ादन के &ित केड+_ य ूएच पर CO2 का उ(cid:29)स ज(cid:14)न) म7 संभािवत कमी का &ितशत ततततााााििििललललककककाााा 8888....11111111 म7 नीचे दशा(cid:14)या गया ह ै :¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 191 ततततााााििििललललककककाााा 8888....11111111 पOरद"ृ य 10वP योजना के अतं 11वP योजना के 12वP योजना के अतं 13वP योजना के अतं (2006-07) म7 अंत ((((2222000011111111----11112222)))) म7 ((((2222000011116666----11117777)))) म7 ((((2222000022221111----22222222)))) म7 (वा(cid:17)त िवक) पOरद"ृ य - 1 4.6 5.0 8.3 15.9 पOरद"ृ य -2 9.9 17.4 पOरद"ृ य -3 11.0 19.2 पOरद"ृ य -4 9.5 17.8 वष (cid:9)2004-5 के संदभ (cid:9)म (cid:16)13वीं योजना के अंत (2021-22) तक (cid:25)व(cid:26)तु (cid:28)ेऽ के िलए उत स् जन(cid:9) तीोता (जीड&पी) के 10 (पए ूित *कलोमाम CO 2) के ूितशत को घटाना व य् वहाय (cid:9)है और इस े8% जीड&पी व(cid:25)ृ4 के अनुमान के साथ लगभग 25-30% तक घटाया जा सकता है।192 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] अध य् ाय 9 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) पपपपचचंंचचंं ववववषषषष(cid:14)(cid:14)(cid:14)(cid:14)यययय ययययोोोोजजजजननननाााा ककककेेेे ििििललललएएएए ममममहहहह####वव वव पपपपणणूूणणूू !! !!जजजजााााननननककककााााररररीीीी ((((इइइइननननपपपपटटुुटटुु )))) 9999....0000 &&&&''''तत तत ााााववववननननाााा 9कसी पावर Jल ांट के सफल काया(cid:14)Tव यन हते ु यह आव"य क ह ै 9क िव(cid:3)ुत िव(cid:17)त ार काय(cid:14)Uम के काया(cid:14)Tव यन हते ु आव"य क सभी इनपुट अलग-अलग िव(cid:3)ुत पOरयोजना6 के िलए तैयार क(cid:11) गई आव"य कता अनुसूची के अनसु ार उपल+ध कराए जाए।ं सभी मह(cid:29)व पूण(cid:14) इनपुट समय पर उपल+ध करान े स े यह सुिन"च त होगा 9क पOरयोजना समय पर पूरी होगी और इस &कार पOरयोजना म7 िवलंब क(cid:11) ि(cid:17)थित म7 लागत और पूण(cid:14) करने क(cid:11) समयाविध बढ़न े जैसी बाधाए ं उ(cid:29)प Tन नहP ह;गी। इस अQय ाय म7 उ(cid:29)प ादन Bमता अिभवृिH के िलए 12वP योजना के दौरान उप(cid:17)क र; और योजना अविध के दौरान आव"य क अTय इनपुट जैसे उ(cid:29)प ादन Jल ांट; के िलए आव"य क अTय अवसंरचना हते ु (cid:17)ट ील, सीम7ट, ए_य ुिमिनयम क(cid:11) आव"य कता का मू_य ांकन िव(cid:17)त ार से 9कया गया ह।ै इस अQय ाय म7 12वP योजना के दौरान िव(cid:3)ुत उ(cid:29)प ादन संबंधी िविभTन कायV के 9UयाTव यन हते ु आव"य क dधन, जनशि| और िनिध आव"य कता का भी मू_य ांकन 9कया गया ह।ै ऐसा महससू 9कया जाता ह ै 9क इस अQय ाय म7 9कए गए उ_ल ेख के अनुसार उप(cid:17)क र, सामNी और dधन क(cid:11) आव"य कता के मू_य ांकन स े अTय मंGालय; और उ(cid:3)ोग; को पया(cid:14)Jत इनपुट &ाJत होगा और िव(cid:3)ुत BेG क(cid:11) आव"य कता के अनुसार अिNम कार(cid:14)वाई और अपने उ(cid:29)प ादन लLय िनधा(cid:14)Oरत करने तथा अिNम योजना तैयार करन े म7 समथ(cid:14) ह;गे। 9999....1111 (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा अअअअििििभभभभववववििृृििृृ ???? ककककााााययययKK!!KK!! मममम 18वP ईपीएस Oरपोट(cid:14) म7 9दए गए अिखल भारतीय (cid:17)त र पर मांग अनुमान; को पूरा करने के िलए आधारभतू मामले म7 12वP योजना के दौरान आव"य क लगभग 87,100 मेगावाट Bमता अिभवृिH का लLय िनधा(cid:14)Oरत 9कया गया ह,ै तदनुसार योजना आयोग aारा यथाअनुमो9दत 88,537 मेगावाट Bमता अिभवृिH का लLय 12वP योजना के िलए िनधा(cid:14)Oरत 9कया गया। 12वP योजना के िलए बनाई जा रही योजना के अनुसार Bमता अिभवृिH के िववरण नीच े तािलका म7 9दए गए ह - : ततततााााििििललललककककाााा 9999....1111 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन &&&&ककककााााररररववववाााारररर (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा अअअअििििभभभभववववििृृििृृ ???? ((((आआआआककंंककंं ड़ड़ड़ड़ ेे ेेममममेगेगेगेगााााववववााााटटटट मममम))66))66 ममममदददद 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ((((2222000011112222----11117777)))) ककककोोोोययययललललाााा++++ििििलललल1111नन नन ााााइइइइटटटट आआआआधधधधााााIIIIररररतततत 69,800 गगगगससैैससैै आआआआधधधधााााIIIIररररतततत 2,540 हहहहााााइइइइAAAAोोोो 10,897 CCCCयय य य ििूूििूू NNNNललललययययरररर 5,300 जजजजोोोोड़ड़ड़ड़ 88888888,,,,555533337777 9999....2222 उउउउपपपप''''कक कक रररर उप(cid:17)क र; क(cid:11) आव"य कता िव(cid:3)ुत पOरयोजना6 क(cid:11) (cid:17)थ ापना के िलए सवा(cid:14)िधक मह(cid:29)व पूण(cid:14) इनपुट म7 से एक ह।ै 11वP योजना के दौरान मुjय Jल ांट उप(cid:17)क र; के (cid:17)व दशे ी (cid:17)त र पर िविनमा(cid:14)ण के िलए सरकार aारा 9कए गए &यास; के पOरणाम(cid:17)व 4प 12वP योजना Bमता अिभवृिH काय(cid:14)Uम के अंतग(cid:14)त मांग को पूरा करने के िलए मुjय Jल ांट उप(cid:17)क र; क(cid:11) घरेलू (cid:17)त र पर पया(cid:14)Jत िविनमा(cid:14)ण Bमता उपल+ध होगी। ऊजा (cid:14) सरु Bा सुिन"च त करन े के िलए¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 193 यह िनतांत मह(cid:29)व पूण(cid:14) ह ै 9क िविनमा(cid:14)ता 9कसी Jल ांट के &चालनकाल के दौरान िव"व सनीय सेवा6 के साथ साथ कल पुजl भी उपल+ध कराएगं े; तदनु सार यह आव"य क ह ै 9क िविनमा(cid:14)ता6 को समान अवसर उपल+ध कराए जाए ं ता9क उनके बीच बेहतर &ित(cid:17)प धा(cid:14) सुिनि?त हो सके और &ितयोगी मू_य पर गुणव(cid:29)त ा यु*त उप(cid:17)क र उपल+ध हो सके। 11वP योजना के दौरान बIत सी पOरयोजनाए ं बकाया Jल ांट; के तैयार न हो पाने के कारण DसUोनाइजेशन से िविनpदRट समयाविध के भीतर पूण(cid:14) लोड &चालन का लLय हािसल नहP कर सक}। 9999....2222....1111 मममम\\ुु\\ुु यय यय QQQQलल ल ल ााााटटंंटटंं उउउउपपपप''''कक कक रररर कोयला आधाOरत पावर Jल ाटं ; क(cid:11) <ेणी म7 12वP/13वP योजना और उसके प"च ात ् (cid:17)थ ािपत क(cid:11) जाने वाली नई Bमता6 के िलए सुपर 9UOटकल &ौ(cid:3)ोिगक(cid:11) को लागू करने का िन"च य 9कया गया ह।ै घरेलू िविनमा(cid:14)ण सुिवधा6 क(cid:11) (cid:17)थ ापना के िलए भारत सरकार aारा 9दए जा रह े &ो(cid:29)स ाहन के आधार पर (cid:17)ट ीम जनरेटर और टबा(cid:14)इन जनरेटर के िलए िविनमा(cid:14)ण सिु वधाए ं (cid:17)थ ािपत करन े हते ु बIत से नए िनमात(cid:14) ा आगे आए ह।- इनम7 िनXन िलिखत शािमल ह - : 1. एल एsड टी-एमएचआई 2. तोशीबा-जेएसड+_ य ू 3. ए_स टम-भारत फोज (cid:14) 4. गैमन – अंसा_ड ो 5. बीजीआर-िहताची 6. डूसन 7. थमl*स -बैबकॉक 8. सेथर वेसल-Oरले पावर ससससययंंययंं NNुुNNुु तत तत उउउउ(cid:25)(cid:25)(cid:25)(cid:25)मममम XXXXवव वव ॉॉॉॉययययललललरररर टटटटबबबबााााइइ!!इइ!! नननन –––– अअअअ^^^^यय यय ििुुििुु ____ययययाााा ंं ंं जजजजननननररररेेेेटटटटरररर • एल एsड टी 4000 ममममेगेगेगेगााााववववााााटटटट 4000 +व ॉयलर और टबा(cid:14)इन का उ(cid:29)प ादन &ारंभ एमएचआई मेगावाट • अ_स टम-भारत फोज (cid:14) - 5000 टबा(cid:14)इन के िविनमा(cid:14)ण हते ु सभी िविनमा(cid:14)ण सुिवधाए ं जून, 2013 तक परू ी क(cid:11) जाए ं मेगावाट • तोशीबा-जेएसड+_ य ू - 3000 सभी िविनमा(cid:14)ण सुिवधाए ं अ&ैल, 2013 तक पूरी क(cid:11) जाए ं मेगावाट • गेमन-अंसा_ड ो 4000 ममममेगेगेगेगााााववववााााटटटट - सुिवधा6 को पूरा करन े क(cid:11) संभािवत तारीख 9दसंबर, 2012 (2000 मेगावाट) और 9दसंबर, 2014 (अितOर*त 2000 मेगावाट) • थमl*स -बैबकॉक और 3000 ममममेगेगेगेगााााववववााााटटटट सभी िविनमा(cid:14)ण सुिवधाए ं माच(cid:14), 2013 तक पूरी िवलकॉ*स क(cid:11) जाए ं • बीजीआर-िहताची 5 बॉयलर &गित सभी िविनमा(cid:14)ण सुिवधाए ं जनवरी, 2013 तक +व ॉयलस(cid:14) &ाइवेट पूरी क(cid:11) जाए ं वष(cid:14) (~3000 िलिमटेड ममममेगेगेगेगााााववववााााटटटट194 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] • बीजीआर िहताची 5 टबा(cid:14)इन सभी िविनमा(cid:14)ण सुिवधाए ं जलु ाई, 2014 तक टबा(cid:14)इन जनरेटर पूरी क(cid:11) जाए ं जनरेटन &ित &ाइवेट िलिमटेड वष(cid:14) (~3000 मेगावाट • दसू न चेTन ई व*स (cid:14) 2200 ममममेगेगेगेगााााववववााााटटटट डीसीड+_ य ू &ाइवेट िलिमटेड दसू न, कोOरया &ाइवेट िलिमटेड िलिमटेड क(cid:11) 100% (cid:17)व ािम(cid:29)व वाली एक *(सब 9UOटकल सहायक कंपनी ह ै िजसक(cid:11) (cid:17)थ ापना भारत म7 और सुपर 20.7.2007 को क(cid:11) गई। 9UOटकल) • मौजूदा सुिवधा – चेTन ई : अिधNहीत क(cid:11) गई अितOर*त सुिवधा कांचीपुरम िजले का मTन ूर गांव • अितOर*त सुिवधा6 से उ(cid:29)प ादन िसतंबर, 2012 तक शु4 9कया जाए इसके अलावा बीएचईएल ने 11वP योजना के अंत (2011-12) तक अपनी िविनमा(cid:14)ण Bमता को 6,000 मेगावाट &ितवष(cid:14) स े बढ़ाकर 15,000 मेगावाट &ित वष (cid:14) करन े के िलए अपनी अवसरं चना का सुदढ़ृ ीकरण 9कया ह।ै िविनमा(cid:14)ता6 aारा दी गई सूचना से यह तFय उभरकर सामने आए ह - 9क सुपर 9UOटकल (cid:17)ट ीम जनरेटर और टबा(cid:14)इन जनरेटर के िलए िनXन िलिखत घरेलू Bमताए ं उपल+ध ह;गी : 2222000011113333----11114444 ततततकककक 2222000011114444----11115555 ततततकककक एएएएससससजजजजीीीी ((((ममममगगेेगगेे ााााववववााााटटटट)))) 26,500 40,500 टटटटीीीीजजजजीीीी ((((ममममेगेगेगेगााााववववााााटटटट)))) 30,020 35,020 9999....2222....2222 QQQQलल लल ााााटटंंटटंं ककककेेेे बबबबककककााााययययाााा उउउउपपपपककककररररणणणण ((((बबबबीीीीओओओओपपपपीीीी)))) थम(cid:14)ल पावर पOरयोजना6 क(cid:11) समय पर (cid:17)थ ापना सुिनि?त करने के िलए Jल ांट के बकाया उप(cid:17)क र जैस े कोल हड- Dलग Jल ांट, ऐश हड- Dलग Jल ांट, जल उपचार &णाली/डीएम Jल ांट, कूDलग टावर, सीडब_य ू &णाली, िचमनी, Jल ांट इलेि*Sकल एsड ि(cid:17)वचयाड (cid:14) आ9द क(cid:11) पहचान मह(cid:29)व पूण(cid:14) आइटम; के 4प म7 क(cid:11) गई ह।ै Bमता अिभवृिH के लLय ; को &ाJत करने के िलए बीओपी पहले भी और लगातार एक मह(cid:29)व पूण(cid:14) BेG बना Iआ ह।ै बीओपी &णािलय; से जुड़ े जोिखम; को कम करने के िलए बीओपी &णािलय; का मानक(cid:11)करण, पOरयोजना6 के तजे ी स े काया(cid:14)Tव यन हते ु गुणव(cid:29)त ायु*त और बड़ े व7डर सुिनि?त करन े के िलए अहक(cid:14) आव"य कता6 क(cid:11) समीBा, बीओपी आदशे ; और उनके पOरसमापन स े संबंिधत आधारभूत एवं गितशील डटे ा एकG करने के िलए 9कसी केTe ीय संगठन अिधदिे शत करने जैसे उपाय 9कए जाने चािहए। यह भी महसूस 9कया जाता ह ै 9क मेकेिनकल उप(cid:17)क र; के साथ िसिवल िनमा(cid:14)ण क(cid:11) नवीनतम पHितय; और जनशि| का अिधकतम सदपु योग जैसे उपाय 9कए जान े क(cid:11) आव"य कता ह।ै उि~माण(cid:14) और (cid:17)थ ापना चU को कम करने के िलए नई उि~मा(cid:14)ण &ौ(cid:3)ोिग9कय; को अपनाने के िलए व7डर; को &ो(cid:29)स ािहत 9कया जाए। िनमा(cid:14)ण और पOरयोजना6 के 9UयाTव यन हते ु कुशल जनश ि| तैयार करने के िलए सं(cid:17)थ ागत (cid:15)य व(cid:17)थ ा पर भी जोर 9दया जाए।¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 195 सीईए (cid:6)ारा संकिलत क(cid:14) गई सूचना के अनुसार (cid:22)मुख बीओपी के िलए पया(cid:29)(cid:30)त सं(cid:31) या म व डर उपल$ध ह।' बीओपी व डर) के िववरण िन+न ानुसार ह ': बबबबीीीीओओओओपपपपीीीी कककक(cid:7)(cid:7)(cid:7)(cid:7) सससस(cid:10)(cid:10)ंं(cid:10)(cid:10)ंं यय यय ाााा ववववडड(cid:14)(cid:14)डड(cid:14)(cid:14) रररर कोल हड' -लग िस.ट म 15 ऐश हड' -लग िस.ट म 13 कू-लग टावर 12 डीएम (cid:30)ल ांट 18 समय पर Bमता अिभवृिH सुिनि?त करन े के िलए बीओपी उप(cid:17)क र; से संबंिधत कुछ सुझाव िनXन ानसु ार ह - : • िवकासकता (cid:14) बीओपी का काया(cid:14)Tव यन ईपीसी आधार पर कर सकते ह।- • बीओपी व7डर; से संबंिधत सभी सूचना जसै े हाथ म 7 मौजदू आदशे , उनके काया(cid:14)Tव यन क(cid:11) ि(cid:17)थित आ9द के िलए एक वेब आधाOरत पोट(cid:14)ल िडजाइन और &बंिधत करन े क(cid:11) आव"य कता ह,ै ता9क पOरयोजना के िवकासकता (cid:14) पुjत ा सूचना के साथ िनण(cid:14)य ल े सक7। • दसू रे चरण म7 बीओपी व7डर और िनमा(cid:14)ण एज7िसय; को उनके िनRप ादन के आधार पर रे€टग दी जा सकती ह।ै • बोली द(cid:17)त ावेज; म7 पहले से मौजूद काय(cid:14)/बोली Bमता आ9द का उ_ल ेख 9कया जाना चािहए। • ईपीसी संिवदाकार, िवकासकता(cid:14) के साथ साथ िविनमा(cid:14)ता6 aारा िव(cid:3)ुत पOरयोजना क(cid:11) आव"य कता6 के िलए कुशल/अHक(cid:14) ुशल <िमक; का &िशBण शु4 9कया जाए। 9999....3333 ममममहहहह####वव वव पपपपणणूूणणूू !! !!ससससााााममममFFFFीीीी िव(cid:3)ुत पOरयोजना6 क(cid:11) (cid:17)थ ापना के िलए (cid:17)ट ील और सीम7ट &मुख सामNी ह।- हाइ[ो और थम(cid:14)ल दोन; पOरयोजना6 के मामले म7 (cid:17)ट ील और सीम7ट क(cid:11) आव" यकता (cid:17)थ ल िवशेष के आधार पर होती ह ै और िसिवल इंजीिनय€रग काय (cid:14) पOरयोजना6 क(cid:11) िवशेषता6 के आधार पर अलग अलग पOरयोजना6 के िलए अलग अलग होता ह।ै थम(cid:14)ल पOरयोजना6 के मामले म7 िसिवल काय(cid:14) उस ि(cid:17)थित म7 अिधक होगा जब पOरयेाजना क(cid:11) पहली यूिनट नए (cid:17)थ ान पर अवि(cid:17)थत क(cid:11) जाती ह।ै उसी (cid:17)थ ान पर अितOर*त यूिनट (cid:17)थ ािपत करने पर िसिवल काय (cid:14) अपेBाकृत कम होता ह।ै हालां9क आव"य कता का अनुमान लगाने के उZ"े य से उपयु*त खपत मानदडं ; क(cid:11) गणना पहले पूरे 9कए गए कायV के साथ साथ 9UयािTवत क(cid:11) जा रही पOरयोजना6 के सदं भ(cid:14) म7 (cid:17)ट ील और सीम7ट क(cid:11) वा(cid:17)त व9क खपत के आधार पर क(cid:11) गई ह।ै इस बात को Qय ान म7 रखते Iए 12वP योजना म7 हाइ[ो और थमल(cid:14) पOरयोजना6 के िलए आव"य क (cid:17)ट ील और सीम7ट का मु_य ांकन केवल अनुमान पर ही आधाOरत होगा। 9999....3333....1111 ससससााााममममFFFFीीीी आआआआवववव----यय यय ककककतततताााा ककककेेेे ििििललललएएएए ममममााााननननददददडडडडंंंं िव(cid:3)ुत उ(cid:29)प ादन पOरयोजना6 के िलए इनपुट सामNी क(cid:11) गणना हते ु &यु*त मानदडं नीचे तािलका 9.2 म7 9दए अनुसार ह - :196 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ततततााााििििललललककककाााा 9999....2222 ममममहहहह####वव वव पपपपणणूूणणूू !! !!इइइइननननपपपपुटुटुटुट ककककेेेे ििििललललएएएए ममममााााननननददददडडडंंडंं ((((आआआआककंंककंं ड़ड़ड़ड़ेे ेे टटटटनननन/ममममगगेेगगेे ााााववववााााटटटट) उउउउ(cid:20)(cid:20)(cid:20)(cid:20)पप पप ााााददददनननन पपपप(cid:22)(cid:22)(cid:22)(cid:22)ररररययययोोोोजजजजननननाााा(cid:24)(cid:24)(cid:24)(cid:24) ककककेेेे ििििललललएएएए इइइइननननपपपपुटुटुटुट ससससाााामममम(cid:31)(cid:31)(cid:31)(cid:31)ीीीी हहहहततेेततेे ुु ुुममममााााननननददददडडडडंंंं ससससााााममममFFFFीीीी कककक++++ आआआआवववव----यय यय ककककतततताााा &&&&िििितततत थम(cid:14)ल हाइ[ो अ(cid:129) य ुि|यां ममममेगेगेगेगााााववववााााटटटट ककककोोोोययययललललाााा////ििििलललल1111नन नन ााााइइइइटटटट गगगगससैैससैै आआआआधधधधााााIIIIररररतततत आआआआधधधधााााIIIIररररतततत कककक)))) ससससीीीीममममटट66टट66 150 60 956 खखखख)))) ढढढढााााचचंंचचंं ाााागगगगतततत ''''टट टट ीीीीलललल 85 29 34 गगगग)))) &&&&बबबबििििललललतततत ''''टट टट ीीीीलललल 45 24 93 घघघघ)))) ''''टट ट ट ेेननेेननललललससेेससेे ''''टट टट ीीीीलललल 130.61 51.6 - बंकर म7 &यु*त डडडड....)))) एएएएYYYYयय यय ििुुििुु ममममििििननननययययमममम 0.5 0.5 0.1 Dवडो, मेटल *ल ैDडग वॉल, कंSोल 4म म7 &यु*त 9999....3333....2222 ससससााााममममFFFFीीीी कककक++++ आआआआवववव----यय यय ककककतततताााा उ(cid:29)प ादन िव(cid:17)त ार योजना के अनु4प 12वP और 13वP योजना के िलए मह(cid:29)व पूण(cid:14) सामNी क(cid:11) आव"य कता क(cid:11) गणना तािलका 9.3 और 9.4 म7 9दए गए मानदडं ; के अनुसार क(cid:11) गई ह ै : ततततााााििििललललककककाााा 9999....3333 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ििििललललएएएए ममममहहहह####वव वव पपपपूणूणूणूण !! !!इइइइननननपपपपटटुुटटुु (आआआआककंंककंं ड़ड़ड़ड़ ेे ेेििििममममििििललललययययनननन टटटटनननन मममम)6666 ####.... सससस..ंं..ंं ससससाााामममम(cid:31)(cid:31)(cid:31)(cid:31)ीीीी थथथथममममलल(cid:15)(cid:15)लल(cid:15)(cid:15) (cid:17)(cid:17)(cid:17)(cid:17)ममममतततताााा हहहहााााइइइइ$$$$ोोोो जजजजोोोोड़ड़ड़ड़ (cid:17)(cid:17)(cid:17)(cid:17)ममममतततताााा ककककोोोोययययललललाााा औऔऔऔरररर गगगगससैैससैै आआआआधधधधाााा(cid:22)(cid:22)(cid:22)(cid:22)ररररतततत 11110000,,,,888899997777 ििििलललल%%%%नन नन ााााइइइइटटटट आआआआधधधधाााा(cid:22)(cid:22)(cid:22)(cid:22)ररररतततत 2222,,,,555544440000 ममममेगेगेगेगााााववववााााटटटट 66669999,,,,888800000000 ममममेगेगेगेगााााववववााााटटटट ममममेगेगेगेगााााववववााााटटटट 1. सीम7ट 10.47 0.15 10.42 21.04 2. ढांचागत (cid:17)ट ील 5.93 0.07 0.37 6.37 3. &बिलत (cid:17)ट ील 3.14 0.06 1.01 4.21 4. (cid:17)ट ेनलेस (cid:17)ट ील 9.11 0.13 0 9.24 5. ए_य ुिमिनयम 0.04 0.001 0.001 0.042¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 197 ततततााााििििललललककककाााा 9999....4444 11113333वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ििििललललएएएए ममममहहहह####वव वव पपपपूणूणूणूण !! !! इइइइननननपपपपटटुुटटुु ((((आआआआककंंककंं ड़ड़ड़ड़ ेे ेेििििममममििििललललययययनननन टटटटनननन मममम))66))66 ####.... सससस..ंं..ंं ससससाााामममम(cid:31)(cid:31)(cid:31)(cid:31)ीीीी थथथथममममलल(cid:15)(cid:15)लल(cid:15)(cid:15) (cid:17)(cid:17)(cid:17)(cid:17)ममममतततताााा हहहहााााइइइइ$$$$ोोोो (cid:17)(cid:17)(cid:17)(cid:17)ममममतततताााा जजजजोोोोड़ड़ड़ड़ ककककोोोोययययललललाााा गगगगससैैससैै आआआआधधधधाााा(cid:22)(cid:22)(cid:22)(cid:22)ररररतततत पपपपरररर 11112222000000000000 आआआआधधधधाााा(cid:22)(cid:22)(cid:22)(cid:22)ररररतततत ििििववववचचचचाााारररर ननननहहहह,,,, ----ककककययययाााा ममममेगेगेगेगााााववववााााटटटट 55556666,,,,444400000000 गगगगययययाााा ममममेगेगेगेगााााववववााााटटटट 1. सीम7ट 8.46 0 11.47 19.93 2. ढांचागत (cid:17)ट ील 4.79 0 0.41 5.2 3. &बिलत (cid:17)ट ील 2.54 0 1.12 3.66 Tय ूि*लयर पावर कॉपyरेशन ऑफ इंिडया िलिमटेड (एनपीसीआईएल) के मू_य ांकन के आधार पर Tय ूि*लयर पOरयोजना6 के िलए (cid:17)ट ील, सीम7ट और अTय सामNी क(cid:11) आव"य कता आयोजना उZ"े य ; से कोयला आधाOरत पOरयोजना6 क(cid:11) कुल आव"य कता के 13% मानी जाती ह।ै उपयु(cid:14)*त को Qय ान म7 रखते Iए Tय ूि*लयर पOरयेाजना6 के िलए सीईए aारा अनुमािनत सामNी आव"य कता के िववरण तािलका 9.5 म7 9दए गए ह।- ततततााााििििललललककककाााा 9999....5555 13वP योजना के दौरान Tय ूि*लयर पOरयोजना6 हते ु मह(cid:29)व पूण(cid:14) इनपुट ((((आआआआककंंककंं ड़ड़ड़ड़ ेे ेेििििममममििििललललययययनननन टटटटनननन मममम))66))66 ससससााााममममFFFFीीीी 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा 11113333वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा 5555,,,,333300000000 ममममेगेगेगेगााााववववााााटटटट 11118888,,,,000000000000 ममममेगेगेगेगााााववववााााटटटट ससससीीीीममममटट66टट66 1.04 3.51 ढढढढााााचचंंचचंं ाााागगगगतततत ससससीीीीममममटट66टट66 0.58 1.99 &&&&बबबबििििललललतततत ''''टट टट ीीीीलललल 0.31 1.05 पावर Jल ांट उप(cid:17)क र; के िविनमा(cid:14)ण हते ु आव"य क मु*त सामNी म7 काD(cid:17)टग और फो‚जग, (cid:17)ट ील Jल ेट, ढांचागत (cid:17)ट ील, कॉपर, सीआरजीओ/सीआरएनजीओ आ9द शािमल ह।- जब9क (cid:17)ट ील सीम7ट, कॉपर, ए_य ुिमिनयम आ9द ऐसी सामNी ह - जो उि~मा(cid:14)ण और (cid:17)थ ापना तथा पारेषण और िवतरण नेटवक(cid:14) के िलए आव"य क ह।- इन मह(cid:29)व पूण (cid:14) सामNी से संबंिधत कुछ अनमु ान िनXन िलिखत तािलका म7 9दए गए ह-: टटटटबबबब```` – जजजजननननररररेेेेटटटटरररर ((((टटटटीीीीजजजजीीीी)))) ससससटटेेटटेे **** ककककेेेे ििििललललएएएए ककककााााaaaa''''टटटटगगगग औऔऔऔरररर फफफफोोोोccccजजजजगगगग बीएचईएल aारा उपल+ध कराए गए िववरण के अनुसार 500/660/800 मेगावाट Bमता वाली पOरयोजना6 के िलए काD(cid:17)टग और फो‚जग क(cid:11) औसत आव"य कता संबंधी िववरण नीचे 9दए गए ह - :¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 199 सुपर 9UOटकल +व ॉयलर के िलए आव"य क उ5च एलॉय ƒूब और पाइप (जैसे टी91/पी91, टी92/पी92 Nेड) और िथक प ् लेट; क(cid:11) भारी माGा को Qय ान म7 रखते Iए दशे म7 (cid:17)व दशे ी (cid:17)त र पर इनके िविनमा(cid:14)ण हते ु Bमताए ं (cid:17)थ ािपत करने क(cid:11) आव"य कता ह ै ता9क आयात पर िनभ(cid:14)रता कम क(cid:11) जा सके। ककककॉॉॉॉपपपपरररर : आईईईएमए के अनुसार िव(cid:3)ुत BेG के िलए कॉपर क(cid:11) आव"य कता लगभग 12.5 लाख मीOSक टन &ित वष (cid:14) होगी। इस &कार संपूण(cid:14) 12वP योजना के िलए लगभग 56 लाख मीOSक टन कॉपर आव"य क होगा। इसम7 सीएजीआर क(cid:11) वृिH के अनसु ार लगभग 10% &ित वष(cid:14) क(cid:11) वृिH अपेिBत ह।ै कॉपर के िलए एफआईएमआई aारा उपल+ध कराई गई सूचना के अनुसार 12वP येाजना के िलए Bमता, उ(cid:29)प ादन और खपत के िववरण नीचे 9दए गए ह - : ललललााााखखखख एएएएममममटटटटीीीी 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा (2012- (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा उउउउ####पप पप ााााददददनननन खखखखपपपपतततत 17) 2012-13 10.0 8.0 8.8 2013-14 10.0 8.5 9.8 2014-15 15.0 13.2 11.0 2015-16 15.0 13.5 12.3 2016-17 15.0 13.7 13.3 एएएएYYYYयय यय ििुुििुु ममममििििननननययययमममम एल ् युिमिनयम क(cid:11) आव"य कता क(cid:11) गणना के िलए िनXन िलिखत मानदडं ; पर िवचार 9कया गया ह ै : उ(cid:29)प ादन (cid:17)ट ेशन; के िलए ए_य ुिमिनयम हते ु मानदडं : ((((एएएएममममटटटटीीीी &&&&िििितततत ममममेगेगेगेगााााववववााााटटटट)))) ससससााााममममFFFFीीीी थथथथममममलल!!लल!! हहहहााााइइइइAAAAोोोो अअअअ^^^^यय यय ििुुििुु ____ययययाााा ंं ंं ककककोोोोययययललललाााा गगगगससैैससैै CCCCयय य य ििूूििूू NNNNललललययययरररर आआआआधधधधााााIIIIररररतततत आआआआधधधधााााIIIIररररतततत आआआआधधधधााााIIIIररररतततत एएएएYYYYयय यय ििुुििुु ममममििििननननययययमममम 0.5 0.5 कोयला 0.1 Dवडो, मेटल *ल ैDडग वॉल, कंSोल आधाOरत का 4म, कंड*ट र म7 &यु*त 130% 12वP और 13वP योजना म7 उ(cid:29)प ादन (cid:17)ट ेशन; के िलए ए_य ुिमिनयम क(cid:11) आव"य कता :200 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ((((आंकड़ े लाख एमटी)))) ससससाााामममम(cid:4)(cid:4)(cid:4)(cid:4)ीीीी 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा 11113333वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककोोोोययययललललाााा गगगगससैैससैै (cid:18)(cid:18)(cid:18)(cid:18)यय यय ििूूििूू (cid:21)(cid:21)(cid:21)(cid:21)ललललययययरररर हहहहााााइइइइ(cid:25)(cid:25)(cid:25)(cid:25)ोोोो ककककोोोोययययललललाााा गगगगससैैससैै (cid:18)(cid:18)(cid:18)(cid:18)यय यय ििूूििूू (cid:21)(cid:21)(cid:21)(cid:21)ललललययययरररर हहहहााााइइइइ(cid:25)(cid:25)(cid:25)(cid:25)ोोोो आआआआधधधधाााा(cid:15)(cid:15)(cid:15)(cid:15)ररररतततत आआआआधधधधाााा(cid:15)(cid:15)(cid:15)(cid:15)ररररतततत आआआआधधधधाााा(cid:15)(cid:15)(cid:15)(cid:15)ररररतततत आआआआधधधधाााा(cid:15)(cid:15)(cid:15)(cid:15)ररररतततत आआआआधधधधाााा(cid:15)(cid:15)(cid:15)(cid:15)ररररतततत आआआआधधधधाााा(cid:15)(cid:15)(cid:15)(cid:15)ररररतततत 66669999,,,,888800000000 2222,,,,555544440000 5555,,,,333300000000 11110000,,,,888899997777 55556666,,,,444400000000 ---- 11118888000000000000 11112222000000000000 ममममगगेेगगेे ााााववववााााटटटट ममममगगेेगगेे ााााववववााााटटटट ममममगगेेगगेे ााााववववााााटटटट ममममगगेेगगेे ााााववववााााटटटट ममममगगेेगगेे ााााववववााााटटटट ममममगगेेगगेे ााााववववााााटटटट ममममगगेेगगेे ााााववववााााटटटट एएएए(cid:27)(cid:27)(cid:27)(cid:27)यय यय ििुुििुु ममममििििननननययययमममम 0.349 0.012 0.034 0.010 0.282 - 0.117 0.012 जजजजोोोोड़ड़ड़ड़ 0000....444400005555 0000....444411111111 &थम दRृ ट या सीआरजीओ और िथकर (cid:17)ट ील Jल ेट; को छोड़कर 9कसी भी मह(cid:29)व पूण(cid:14) सामNी क(cid:11) कमी नहP ह।ै इसके अलावा ƒूब और पाइप िवशेष 4प से एलॉय (cid:17)ट ील ƒबू और पाइप (टी91/पी91, टी92/पी92 Nेड) के िलए दशे म7 (cid:17)व दशे ी िविनमा(cid:14)ण Bमता पया(cid:14)Jत ह,ै िजसके िव(cid:17)त ार क(cid:11) आव"य कता ह।ै िव(cid:3)ुत उ(cid:29)प ादन उप(cid:17)क र; के िलए मह(cid:29)व पूण(cid:14) भारी काD(cid:17)टग और फो‚जग के िलए (cid:17)व दशे ी (cid:17)त र पर कुछ Bमताए ं िवकिसत करने के िलए िनजी BेG के बड़ े िविनमा(cid:14)ता6 aारा योजना बनाई जा रही ह ै और िनकट भिवRय म7 उनके (cid:17)थ ािपत होने क(cid:11) उXम ीद ह।ै 9999....4444 GGGGधधधधनननन आआआआवववव----यय यय ककककतततताााा िव(cid:3)ुत उ(cid:29)प ादन के िलए dधन क(cid:11) उपल+ध ता अिनवाय(cid:14) ह।ै इसके अलावा dधन के bोत; का पता लगान े अथवा इसक(cid:11) उपल+ध ता संगOठत करने के िलए यह भी आव"य क ह ै 9क ऐसी अवसरं चना सृिजत क(cid:11) जाए जो िनधा(cid:14)Oरत (cid:17)थ ान तक dधन को पIचं ाने म7 सहायक हो। खान;/बदं रगाह; तथा पOरयोजना6 को पूरा करने क(cid:11) दिृ Rn से आव"य क पOरवहन सुिवधा6 का िवकास भी उतना ही मह(cid:29)व पूण(cid:14) ह।ै खान; और यहां तक 9क पOरवहन सुिवधा6 के िवकास को मूत(cid:14) 4प दने े म7 लगने वाला समय कुछ मामल; म7 थम(cid:14)ल पावर (cid:17)ट ेशन; क(cid:11) (cid:17)थ ापना म7 लगने वाल े समय से भी अिधक होता ह।ै इसिलए िव(cid:3)ुत BेG के िलए यह अिनवाय(cid:14) आव"य कता ह ै 9क लंबे समय तक कोयल े क(cid:11) संभािवत आव"य कता का अनुमान लगाया जाए, कोयला मंGालय, रेलवे और पोट(cid:14) &ािधकाOरय; के साथ िमलकर समिTवत ढंग से आगामी पावर (cid:17)ट ेशन; के िलए कोयला खान; और पOरवहन अवसंरचना का िवकास 9कया जाए। गैस पOरयोजना6 के िलए गैस पOरवहन अवसंरचना भी (cid:17)थ ािपत 9कए जाने क(cid:11) आव" यकता ह।ै इस लLय को Qय ान म7 रखत े Iए dधन आव"य कता का मू_य ांकन/आकलन 9कया गया ह।ै थम(cid:14)ल पावर (cid:17)ट ेशन; के िलए कोयले क(cid:11) आव"य कता अनसु ूिचत उ(cid:29)प ादन, आपूत(cid:14) 9कए जाने वाले/9कए गए कोयले क(cid:11) गुणव(cid:29)त ा और पावर (cid:17)ट ेशन उप(cid:17)क र क(cid:11) ि(cid:17)थित पर िनभ(cid:14)र करती ह।ै हालां9क 12वP योजना के सीमांत वष (cid:14) के दौरान dधन क(cid:11) सामाTय आव"य कता का आकलन 9कया गया ह।ै इसके िववरण नीचे 9दए गए ह - : ततततााााििििललललककककाााा 9999....6666 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ससससीीीीममममााााततंंततंं ववववषषषष !!!!ककककेेेे ििििललललएएएए GGGGधधधधनननन आआआआवववव----यय यय ककककतततताााा ....धधधधनननन आआआआवववव////यय यय ककककतततताााा 2222000011116666----11117777 ककककोोोोययययललललाााा ((((ििििममममििििललललययययनननन टटटटनननन)))) 842 गगगगससैैससैै ++++एएएएललललएएएएननननजजजजीीीी ((((एएएएममममएएएएममममएएएएससससससससीीीीएएएएममममडडडडीीीी)))) 100*¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 201 * यह आव"य कता 11वP योजना के अंत तक 18381 मेगावाट क(cid:11) गैस आधाOरत Bमता के अन4ु प ह ै और 12वP योजना के िलए अितOर*त आव"य कता 90% पीएलएफ पर &चालन के िलए लगभग 2440 मेगावाट Bमता ह।ै गैस क(cid:11) अनुपल+ध ता के कारण 13,000 मेगावाट क(cid:11) अितOर*त Bमता वाली िनमा(cid:14)णाधीन पOरयोजना6 के िलए गैस क(cid:11) आव"य कता पर िवचार नहP 9कया गया ह।ै पपपपIIIIररररववववहहहहनननन िव(cid:3)ुत BेG क(cid:11) वृिH म7 पOरवहन BेG मह(cid:29)व पूण(cid:14) भूिमका अदा करता ह।ै 12वP पंचवषhय योजना म7 Bमता अिभवृिH के लLय ; को &ाJत करन े के िलए िविभTन पOरवहन BेG; जैसे रेलवे, राजमाग(cid:14) और सड़क, पOरवहन, पोट(cid:14), अंतदशl ीय जलमाग(cid:14) और गैस पाइप लाइन; का िवकास मह(cid:29)व पूण(cid:14) ह।ै 12वP योजना के अंितम वष(cid:14) (2016- 17) तक िव(cid:3)ुत कंपिनय; के िलए कोयले क(cid:11) कुल आव"य कता लगभग 842 मीOSक टन होने का अनुमान ह,ै इसम 7 घरेलू और आयाितत कोयल े के साथ साथ कैिJटव कोयला +ल ॉक; से कोयला शािमल ह।ै इसके अलावा 12वP योजना के दौरान तथा उसके बाद यूिनट; का आकार 660 मेगावाट से बढ़ाकर 800 मेगावाट तथा 1,000 मेगावाट 9कए जाने से भारी ओवर डाइम7शनल कंसाइनम7ट (ओडीसी) का &ेषण अभूतपूव(cid:14) तरीके से पोट(cid:14) स े आयाितत उपकरण; को (cid:17)व दशे ी िविनमा(cid:14)ता6 और पOरयोजना (cid:17)थ ल; तक पOरवहन क(cid:11) आव"य कता होगी। इसके िलए साहिसक &यास, नीितगत पOरवतन(cid:14) के साथ साथ सड़क, रेलवे और बंदरगाह BGे ; म7 भार और रख रखाव के िनदशl ; म7 आधारभूत पOरवतन(cid:14) करने ह;गे। ररररेेेेललललवववव ेे ेे भारतीय रेलवे क(cid:11) दीघ(cid:14)कालीन रणनीित के अनसु ार मालभाड़ े और यािGय; के आवागमन के िलए अलग अलग डडे ीकेटेड z(cid:11)ट कॉOरडोर (डीएफजी) का िनमा(cid:14)ण 9कया जाना ह।ै वत(cid:14)मान म7 दो डीएफसी पOरयोजनाए ं अथात(cid:14) पूवh डीएफसी (दनकुनी, पि?म बंगाल-लुिधयाना, पंजाब) और पि?मी डीएफसी (जेएनपीटी), मुXब ई-दादरी, उ(cid:29)त र &दशे ) को मंजूरी &दान कर दी गई ह।ै उपयु(cid:14)*त के अलावा रेलवे ने गेज पOरवत(cid:14)न, नई रेलवे लाइन7, नए मागV का िव(cid:3)ुतीकरण और लोकोमोOटव और वेगन क(cid:11) खरीद करने क(cid:11) योजना बनाई ह।ै ffffयय यय ाााापपपपकककक ततततौौौौरररर पपपपरररर ररररेेेेललललवववव ेे ेे नननन ेे ेे अअअअववववससससररंंररंं चचचचननननाााा ससससजजृृजजृृ नननन औऔऔऔरररर (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा ििििननननममममााााणण!!णण!! कककक++++ ((((ददददशशशशाााा मममम 66 66 मममम(cid:2)(cid:2)(cid:2)(cid:2)यय यय मममम औऔऔऔरररर ददददीीीीघघघघाााावव!!वव!! ििििधधधध ललललggggयय यय ((((11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) पपपपचचंंचचंं ववववषषषष(cid:14)(cid:14)(cid:14)(cid:14)यययय ययययोोोोजजजजननननाााा औऔऔऔरररर उउउउससससककककेेेे बबबबाााादददद)))) ककककेेेे ििििललललएएएए ििििननननhhhhनन नन ििििललललििििखखखखतततत ललललggggयय यय ििििननननधधधधााााII!!II!! ररररतततत ((((ककककएएएए हहहह।।ii।।ii ततततााााििििललललककककाााा 9999....7777 0000यय यय ाााापपपपकककक 1111णणेेणणेे ीीीी 11111111वववव,,,, ययययोोोोजजजजननननाााा ककककेेेे ससससशशंंशशंं ोोोोििििधधधधतततत लललल4444यय यय ििििववववजजजजनननन 2222000022220000 ककककेेेे लललल4444यय यय डडडडीीीीएएएएफफफफससससीीीी ससससििििहहहहतततत ललललााााइइइइनननन**** ककककाााा ददददोोोोहहहहररररीीीीककककररररणणणण 2500 11112222,,,,000000000000 ((((ककककललललोोोोममममीीीीटटटटरररर.... गगगगततेेततेे पपपपIIIIररररववववततततनन!!नन!! 6000 11112222,,,,000000000000 ((((ककककललललोोोोममममीीीीटटटटरररर ननननईईईई ललललााााइइइइनननन 66 66 2000 22225555,,,,000000000000 ((((ककककललललोोोोममममीीीीटटटटरररर ििििवववव(cid:25)(cid:25)(cid:25)(cid:25)ततुुततुु ीीीीककककररररणणणण 4500 11114444,,,,000000000000 ((((ककककललललोोोोममममीीीीटटटटरररर बबबबैगैगैगैगनननन**** कककक++++ खखखखररररीीीीदददद 62000 222288889999,,,,111133336666 डडडडीीीीजजजजलललल ललललोोोोककककोोोोममममोोोोIIIIटटटटवववव कककक++++ खखखखररररीीीीदददद 1019 5555333333334444 इइइइललललििेेििेे NNNNLLLLकककक ललललोोोोककककोोोोममममोोोोIIIIटटटटवववव कककक++++ खखखखररररीीीीदददद 1111222200005555 4444222288881111202 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] संभािवत उ5च वृिH लLय ; को &ाJत करने के िलए रेलवे को Bमता िनमा(cid:14)ण, नेटवक(cid:14) िव(cid:17)त ार, उTन यन और आधुिनक(cid:11)करण म7 भारी िनवशे आव"य क होगा। मौजूदा Sंक मागV और कोयले का पOरवहन करने वाले अTय मागV म7 यातायात का दबाव बIत अिधक ह।ै इस उ5च वृिH पOरद"ृ य को &ाJत करने के िलए रेलवे को बड़ी तेजी से अपने नेटवक(cid:14) को सुदढ़ृ करने क(cid:11) आव"य कता ह।ै मालभाड़ा यातायात के उ5च (cid:17) तर से िनपटने के िलए 2020 तक आव"य क संभािवत िनवेश िनXन ानुसार होगा : ततततााााििििललललककककाााा 9999....8888 ििििववववववववररररणणणण ििििननननववववशशेेशशेे (((([[[[पपपपएएएए))))```` बबबबोोोोटटटटललललननननककेेककेे कककक++++ िििि''''थथथथिििितततत सससस ेे ेेििििननननपपपपटटटटननननाााा –––– 23,000 करोड़ यातायात सुिवधाए,ं z(cid:11)ट बाईपास, लॉिजि(cid:17)टक पाक(cid:14) आ9द (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा ििििवववव''''तत तत ाााारररर ---- नई लाइन, 1,80,000 करोड़ डीएफसी सिहत लाइन; का दोहरीकरण/ितहरीकरण/चौहरीकरण 1,30,000 करोड़ गेज पOरवत(cid:14)न 35,000 करोड़ िव(cid:3)ुतीकरण 12,600 करोड़ ररररोोोोaaaaललललगगगग ''''टट टट ॉॉॉॉकककक ---- z(cid:11)ट वैगन, 86,740 करोड़ डीजल लोकोमोOटव, 56,007 करोड़ इलेि*Sक लोकोमोOटव 64,873 करोड़ &&&&ौौौौ(cid:25)(cid:25)(cid:25)(cid:25)ोोोोििििगगगगकककक++++यययय उउउउCCCCनन नन ययययनननन Sैक नवीनीकरण और 25 टन ए*स ल लोड, िwज 71,405 करोड़ 8,000 करोड़ रेलवे के िवजन 2020 द(cid:17)त ावेज; म7 दी गई िव(cid:17)त ार योजना6 से यह िव"व ास होता ह ै 9क रेलवे 12वP पंचवषhय योजना और उसके प"च ात ् िव(cid:3)ुत BेG क(cid:11) आव"य कता6 को पूरा करने म 7 सBम होगा, बशतl 9क उनका िव(cid:17)त ार काय(cid:14)Uम िवजन द(cid:17)त ावेज के अनुसार पूरा हो जाए। अअअअततंंततंं ददददशशjjशशjj ीीीीयययय जजजजलललल पपपपIIIIररररववववहहहहनननन भारतीय अंतदशl hय जलमाग(cid:14) &ािधकरण (आईड+_ य ूटी) ने 10460 करोड़ tपए के अनुमािनत िनवेश के साथ 12वP पंचवषhय योजना के दौरान राRS ीय जल मागV/अTय जल मागV के िवकास, उTन यन, आधुिनक(cid:11)करण और िव(cid:17)त ार क(cid:11) योजना बनाई ह।ै इस बात को Qय ान म7 रखत े Iए आईटीड+_ य ू के जOरए कोल कागy मूवम7ट क(cid:11) अपार संभावना ह।ै यह धीरे धीरे िव(cid:3)ुत कंपिनय; के िलए आकष(cid:14)ण का केन् e बनता जा रहा ह,ै िवशेष 4प से आयात 9कए जान े वाले कोयले के पOरवहन के संदभ(cid:14) म 7 ऐसी आशा ह ै 9क एनटीपीसी क(cid:11) फर*क ा पOरयोजना के िलए हि_दया से &ित वष(cid:14) लगभग 3.0 िमिलयन टन कोयले का पOरवहन आईटी ड+_ य ू के जOरए 9कया जा रहा ह ै जो सफल ह।ै वत(cid:14)मान म 7 10 पावर (cid:17)ट ेशन गंगा नदी के 9कनारे पर &चािलत ह - और उनम 7 से पि?म बंगाल म7 (7) और िबहार म7 (3) पावर (cid:17)ट ेशन अवि(cid:17)थत ह।- इसके अलावा 15,000 से अिधक (cid:17)थ ािपत Bमता वाले 11 और थम(cid:14)ल पावर (cid:17)ट ेशन; क(cid:11) (cid:17)थ ापना िबहार और उ(cid:29)त र &दशे रा/य ; म7 &(cid:17)त ािवत ह।ै उनके िलए कोयले क(cid:11) अनुमािनत¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 203 आव"य कता लगभग 70 िमिलयन मीOSक टन &ित वष(cid:14) होगी, िजसे आईटीड+_ य ू के जOरए पूरा 9कया जा सकता ह।ै ररररााााRRRRLL LL ीीीीयययय ररररााााजजजजममममाााागगगग !! !! भारत के कुल सड़क नेटवक(cid:14) म7 राRS ीय राजमाग(cid:14) का &ितशत केवल लगभग 2% ह ै परंतु इस पर 40% स े अिधक यातायात होता ह।ै इसके पOरणाम(cid:17)व 4प भारी ओवर डाइम7शनल कंसाइनम7ट (ओडीसी) का माग(cid:14) &बंधन + अ(cid:29)य िधक चुनौतीपूण(cid:14) और कOठन हो जाता ह।ै सडक;/राजमागV के जOरए ओडीसी के पOरवहन स े जुड़ े बIत स े गंभीर मुZ े ह - जसै े िविभTन रा/य ; म7 मोटर वाहन अिधिनयम क(cid:11) अलग ढंग से (cid:15)य ाj या पOरयोजना (cid:17)थ ल; के माग (cid:14) म7 आने वाले पुल; और सड़क; क(cid:11) अपया(cid:14)Jत Bमता, राजमागV म7 सड़क/यातायात कैOरएज क(cid:11) चौड़ाई कम होना, राजमागV पर बनाए गए टोल Jल ाजा क(cid:11) अनुिचत िडजाइन, सड़क; पर अ(cid:29)य ंत घुमावदार मोड़/w7ड/Nेिडएटं और पूवा(cid:14)(cid:29)त र रा/य ; म7 अंडरपास; म7 अपया(cid:14)Jत ऊQव ा(cid:14)धर िनकासी िवशेष 4प से उ_ल ेखनीय ह।- सड़क;, राजमागV और पुल; के लोDडग िविनदशl ; म 7 आव"य क मूलभूत पOरवत(cid:14)न; सिहत इन सम(cid:17)य ा6 का त(cid:29)क ाल िनदान आव"य क ह,ै इसके िलए Oरपोट(cid:14) म7 िनXन िलिखत िवशेष िसफाOरश7 क(cid:11) गई ह - : (cid:1) घरेलू कोयले क(cid:11) कुल िनकासी के लगभग 60% भाग का पOरवहन रेलवे aारा 9कया जा रहा ह।ै (cid:1) भागीदारी का &ितशत 12वP योजना के दौरान भी इतना ही बना रहगे ा। (cid:1) रेलवे को &(cid:29)य ेक कोल फ(cid:11)_ड से कोयले क(cid:11) िनRक ष(cid:14)ण Bमता क(cid:11) पुिn करनी होगी। (cid:1) रेलवे को तीन &मुख कोयला BेG; अथा(cid:14)त उ(cid:29)त री कम(cid:14)पुरा, आईबी वैली और मांद रायगढ़ से कोयल े के िनRक ष(cid:14)ण हते ु अपनी Bमता का िव(cid:17)त ार करना होगा। (cid:1) कोयले के सुचाt और (cid:29)व Oरत िनRक ष(cid:14)ण हते ु कोयल े के खदान स े रेल शीष (cid:14) तक वैगन; म7 (cid:17)व चािलत लोDडग सुिवधा के साथ पOरवहन हते ु कोल कनवेयर का &योग 9कया जाना चािहए। (cid:1) रेलवे को मालभाड़ े और याGी यातायात को अलग अलग करन े के िलए &(cid:17)त ािवत डडे ीकेटेड z(cid:11)ट कॉOरडोर के काय(cid:14) म7 तेजी लानी होगी। (cid:1) रेलवे को यह सुिनि?त करना होगा 9क कोल अनबं डDलग सुिवधा6 वाले सभी बंदरगाह; तक रेल संपक(cid:14) (cid:17)थ ािपत हो। (cid:1) एनटीपीसी और भारतीय अंतदशl ीय जलमाग(cid:14) &ािधकरण (आईड+_ य ूएआई) फर*क ा टीपीएस के िलए तीन मीOSक टन आयाितत कोयले के पOरवहन हते ु एक करार पर ह(cid:17)त ाBर कर7गे। पि?म बंगाल और िबहार म7 गंगा के तट पर अवि(cid:17)थत अTय थम(cid:14)ल पOरयोजना6 के िलए भी ऐसी सभं ावनाए ं तलाश क(cid:11) जानी चािहए। सुपर 9UOटकल यूिनट; के िलए ओवर डाइम7शन कंसाइनम7ट (ओडीसी) के पOरवहन हते ु सड़क और राजमागV के िव(cid:17)त ार क(cid:11) आव"य कता ह।ै इसके िलए िनXन िलिखत तFय ; पर िवचार 9कया जाना चािहए : (cid:1) 49 मीOSक टन से अिधक भार वाले भारी &ेषण; और हाइ[ोिलक ए*स ल, Sेलर को शािमल करने के िलए मोटर वाहन अिधिनयम म7 सशं ोधन। (cid:1) 100 मीOSक टन से अिधक भार वाल े ओडीसी को शािमल करन े के िलए आईआरसी/एमओआरटीएच aारा सड़क; और पुल; के िलए भार वगhकरण क(cid:11) समीBा। (cid:1) ओडीसी आवागमन के िलए एकल िखड़़क(cid:11) िनकासी और एकमु"त भुगतान। (cid:1) राजमागV पर िनKमत टोल Jल ाजा का उिचत िडजाइन। (cid:1) सड़क; म7 तजे घुमावदार मोड़/Nेिडएटं को कम करने तथा अंडर पास; म7 पया(cid:14)Jत ऊQव ा(cid:14)धर िनकासी सुिनि?त करन े के िलए पूवy(cid:29)त र और पहाड़ी रा/य ; म7 सड़क िडजाइन म7 पOरवतन(cid:14) ।204 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] (cid:1) हाइ[ो पOरयोजना6 के िलए उिचत पIचं मागV का &ावधान। ममममौौौौजजजजददूूददूू ाााा औऔऔऔरररर &&&&''''तत तत ााााििििववववतततत गगगगससैैससैै पपपपााााइइइइपपपप ललललााााइइइइनननन////ििििFFFFडडडड (cid:1) &ाकृितक गैस अपिशRट dधन; म7 तेजी से अपनाया जाने वाला &ाथिमक ऊजा(cid:14) bोत ह।ै अनुमान ह ै 9क वष (cid:14) 2002 से 2025 के बीच इसक(cid:11) खपत वत(cid:14)मान (cid:17)त र स े लगभग 3-4 गुना बढ़ जाएगी। हम 1986 म7 असम म 7 जब पहली बार ऑयल और गैस और पि?मी समुe तट पर 1974 म 7 &िसH बॉXब े हाई फ(cid:11)_ड क(cid:11) खोज क(cid:11) गई थी तब से बIत &गित कर चुके ह।- (cid:1) गैस का बाजार िवकिसत होने से &ाकृितक गैस के सामािजक और आKथक लाभ उठाने के िलए दशे म7 गैस पाइप लाइन; का समय पर िवकास करना &ाथिमकता बन गया ह।ै ऐसी बड़ी गैस पाइप लाइन; को जब मौजूदा गैस पाइप लाइन; के साथ एक(cid:11)कृत 9कया जाएगा तो अनंितम 4प से राRS ीय गैस िNड का िनमा(cid:14)ण होगा। सांकेितक राRS ीय गैस िNड ने मौजूदा गैस पाइपलाइन7, &ािधकृत/योजनागत पाइप लाइन7 और दरू (cid:17)थ तथा कम िवकिसत BेG; म7 उनके संपक(cid:14) शािमल ह;गे। (cid:1) ईजीओएम (मंिGय; का अिधकार &ाJत समूह) न े दशे म7 घरेलू गैस के िवतरण और सदपु योग के िलए गैस सदपु योग नीित तैयार क(cid:11) ह ै और गैस पाइप लाइन; से संबH मौजूदा गैस आधाOरत और िल9…ड आधाOरत (cid:17)ट ेशन; को केजी डी6 बेिसन से &ा थिमकता के आधार पर गैस आवंOटत क(cid:11) ह।ै वत(cid:14)मान म7 िल9…ड पर &चािलत अथवा कम सदपु योग क(cid:11) जा रही उ(cid:29)प ादन Bमता6 के बेहतर सदपु योग के िलए यह आव"य क ह ै 9क उTह 7 Sंक/सुपर पाइप लाइन नेटवक(cid:14) के भाग के 4प म7 &ाथिमकता के आधार पर जोड़ा जाए। ममममौौौौजजजजददूूददूू ाााा गगगगससैैससैै पपपपााााइइइइपपपप ललललााााइइइइनननन 6666 दशे म7 वत(cid:14)मान गैस पाइप लाइन अवसंरचना लगभग 1200 9कलोमीटर ह,ै िजसक(cid:11) िडजाइन Bमता लगभग 283 एमएमएससीएमडी ह।ै वत(cid:14)मान मुjय Sंक पाइप लाइन7 िनXन ानसु ार ह - : (cid:1) गेल के (cid:17)व ािम(cid:29)व म7 लगभग 8000 9कलोमीटर पाइप लाइन ह - और वह इनका &चालन और रख-रखाव करता ह।ै इसम7 लगभग 150 एमएमएससीएमडी िडजाइन Bमता वाली सुपर लाइन7 (मjु य 4प से एचबीजे –––– जीआरईपी –––– डीवीपीएल तथा डीवीपीएल-जीईआरईपी का उTन यन और डीयूपीएल-डीपीपीएल) शािमल ह।- (cid:1) IIIIररररललललााााययययससंंससंं गगगगससैैससैै LLLLााााससंंससंं पपपपोोोोटटटटjjjjशशशशनननन इइइइननननkkkkाााा''''LL LL NNNNचच चच रररर ििििलललल.... ((((आआआआररररजजजजीीीीटटटटीीीीआआआआईईईईएएएएलललल)))) : Oरलायंस के (cid:17)व ािम(cid:29)व म7 लगभग 1400 9कलोमीटर लंबी पूव(cid:14)-पि?म पाइप लाइन (ईड+_ य ूपीएल) – (काक(cid:11)नाड़ा-हदै राबाद-यूरान-अहमदाबाद) ह,ै िजसक(cid:11) िडजाइन Bमता 80 एमएमएससीएमडी ह,ै िजसका &चालन और रख रखाव Oरलायंस Nुप aारा 9कया जाता ह।ै (cid:1) अअअअCCCCयय यय &&&&ममममखखुुखखुु (cid:26)(cid:26)(cid:26)(cid:26)(cid:27)(cid:27)ेे(cid:27)(cid:27)ेे ीीीीयययय ककककंंंंपपपपििििननननययययाााा ंं ंं :::: (cid:1) गुजरात (cid:17)ट ेट पेSोनट िलिमटेड (जीएसपीएल) : यह 40 एमएमएससीएमडी क(cid:11) िडजाइन Bमता वाली 1200 9कलोमीटर लंबी पाइप लाइन का &चालन और रख-रखाव करती ह।ै (cid:1) अअअअससससम गैस कंपनी िलिमटेड (एजीसीएल) : यह 08 एमएमएससीएमडी क(cid:11) िडजाइन Bमता वाली 500 9कलोमीटर लंबी पाइप लाइन का &चालन और रख-रखाव करती ह।ै (cid:1) &ािधकृत गैस पाइप लाइन7 :::: 2007 म7 पेSोिलयम और &ाकृितक गैस मंGालय ने िनXन िलिखत 9 नई Sंक पाइप लाइन; को &ािधकृत 9कया, िजनक(cid:11) कुल अनुमािनत लंबाई 8700 9कलोमीटर ह ै और िडजाइन Bमता लगभग 209 एमएमएससीएमडी ह।ै (कककक) गगगगललेेललेे :::: - दादरी-बवाना-नांगल (600 9कलोमीटर) - चेनसा-झ/ज र-िहसार (400 9कलोमीटर) - जगदीशपुर-हि_दया (2000 9कलोमीटर)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 205 - दाभोल-बंगलौर (1400 9कलोमीटर) - कोची-कांिजरकोड-बंगलौर (1100 9कलोमीटर) ((((खखखख)))) आरजीटीआईएल :::: - काक(cid:11)नाड़ा-हि_दया (928 9कलोमीटर) - काक(cid:11)नाड़ा-चेTन ई (577 9कलोमीटर) - चेTन ई-बंगलौर-मंगलौर (538 9कलोमीटर) - चेTन ई-तूतीकोरीन (585 9कलोमीटर) ये पाइप लाइन7 िवकास के िविभTन िवकास चरण पर ह।- पपपपीीीीएएएएननननजजजजीीीीआआआआररररबबबबीीीी कककक++++ ''''थथ थथ ाााापपपपननननाााा :::: पेSोिलयम और &ाकृितक गैस िनयामक बोड (cid:14) (पीएनजीआरबी) अिधिनयम, 2006 म7 पेSोिलयम, पेSोिलयम उ(cid:29) पाद; क(cid:11) OरफाइDनग, &ोसेDसग, भंडारण, पOरवहन, िवतरण, िवपणन और िबU(cid:11) एवं &ाकृितक गैस तथा शहरी गैस िवतरण (सीजीडी) स े जुड़ी कंपिनय; के काय(cid:14)कलाप; के िविनयमन हते ु एक डाउन(cid:17)S ीम िनयामक के 4प म7 (cid:17)व तंG िनयामक बोड (cid:14) (पीएनजीआरबी) क(cid:11) (cid:17)थ ापना का &ावधान ह।ै इस बोड (cid:14) क(cid:11) (cid:17)थ ापना कर दी गई ह ै और इसने अपने काय(cid:14)कलाप जून, 2007 से शु4 कर 9दए ह।- पीएनजीआरबी ने गैस के पOरवहन स े संबंिधत कई िविनयम तैयार 9कए ह।- पीएनजीआरबी ईओआई माग(cid:14) के जOरए &ितयोगी बोली &9Uया के आधार पर गैस पाइप लाइन7 िबछाने के िलए कंपिनय; को &ािधकृत करता ह।ै पीएनजीआरबी को अितOर*त गैस पाइप लाइन; क(cid:11) (cid:17)थ ापना के िलए 06 ईओआई &ाJत Iए ह।- पीएनजीआरबी क(cid:11) वेबसाइट के अनुसार य े िनXन ानुसार ह - : (i) म_ल वारम (आं† &दशे ) – िवजयपुर (मQय &दशे ) – भीलवाड़ा (राज(cid:17)थ ान) (ii) मेहसाना (गुजरात) से भ€टडा (पंजाब) वाया जयपुर (राज(cid:17)थ ान) (iii) भ€टडा (पंजाब) – <ीनगर (जXम ू एवं क"म ीर) (iv) सूरत से पारादीप (v) दगु ा(cid:14)पुर से कोलकाता (vi) काक(cid:11)नाड़ा से <ीकाकुलम बबबबंदंदंदंदररररगगगगााााहहहह 12वP योजना के दौरान लगभग 88,000 मेगावाट क(cid:11) अनुमािनत Bमता वृिH को Qय ान म7 रखते Iए 12वP योजना के अंत तक आयात 9कए जाने वाले कोयले क(cid:11) माGा क(cid:11) गणना लगभग 230 मीOSक टन क(cid:11) गई ह,ै िजसम7 ऐसे पावर Jल ांट; क(cid:11) कोयला आव"य कता शािमल ह ै जो पूरी तरह स े आयाितत कोयले पर &चािलत 9कए जाएगं े। जहाजरानी मंGालय aारा जारी 9कए गए बंदरगाह; के िलए मैरीटाइम एज7डा के आधार पर यह लLय िनधा(cid:14)Oरत 9कया गया ह ै 9क 12वP योजना के अंत तक थम(cid:14)ल और कोqकग कोल को िमलाकर बड़ े और छोटे बंदरगाह; म 7 लगभग 476.04 िमिलयन टन कोयले का रख रखाव 9कया जाएगा। इसके अलावा बड़ े बंदरगाह; के Bमता िव(cid:17)त ार और उ(cid:29)प ादकता (cid:17)त र; म7 वृिH के उZ"े य से जहाजरानी मंGालय aारा बIत से &यास शु4 9कए जा रह े ह,- िजनम7 बंदरगाह; क(cid:11) अवसरं चना का आधुिनक(cid:11)करण, नए बथ(cid:14)/टKमनल; का िनमा(cid:14)ण, बथ(cid:14) और [Dे जग के िलए िव(cid:17)त ार/उTन यन पOरयोजनाए,ं नए और आधुिनक उप(cid:17)क र; क(cid:11) (cid:17)थ ापना, कागy हड- Dलग ऑपरेशन का मेकनाइजेशन और कंJय ूटर सहायी &णािलय; aारा ऑटोमेशन शािमल ह।- हालां9क रेल और सड़क कनेि*टिवटी म7 सुधार/िव(cid:17)त ार, िवशेष 4प से अंितम मील तक कनेि*टिवटी पर िवशेष 4प स े Qय ान दने ा होगा। इसके िलए सड़क, रेलवे और पोट(cid:14) &ािधकाOरय; के बीच बेहतर समTव य और अंतरापृRठ क(cid:11) िनतांत आव"य कता ह।ै ससससझझुुझझुु ाााावववव औऔऔऔरररर ििििससससफफफफााााIIIIररररशशशश 66 66 (cid:1) पावर (cid:17)ट ेशन; के िलए आव"य क आयाितत और घरेलू कोयले (लगभग 150 मीOSक टन) का रख रखाव सुिनि?त करन े के िलए बंदरगाह; म7 कोयला अनलोDडग के िलए पया(cid:14)Jत (cid:15)य व(cid:17)थ ाए।ं206 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] (cid:1) पूवh तट पर पारादीप और िवजाग बंदगाह; म7 कोयला रख रखाव सुिवधा6 का िव(cid:17)त ार 9कया जाए। यह उड़ीसा म7 अवि(cid:17)थत खान; से कोयले के िनRक ष(cid:14)ण हते ु आव"य क होगा *य ;9क मौजूदा रेल मागV पर यातायात का दबाव बIत अिधक ह।ै (cid:1) सभी बड़ े और अTय मह(cid:29)व पूण(cid:14) छोटे बंदरगाह; म7 Uेन सुिवधा6, िसलोस, कनवेयर और वेगन Oटपलर का िव(cid:17)त ार कर उTह 7 मेकेनाइज 9कया जाना चािहए। (cid:1) पेनामे*स अथवा केपसाइट वेसल; के रख रखाव हते ु िविभTन बंदरगाह; म7 [ा{ट सुिवधा का िव(cid:17)त ार 9कया जाना चािहए। ओडीसी क(cid:11) अनलोDडग के िलए कम से कम दो बड़ े बंदरगाह; अथा(cid:14)त पि?मी तट पर कांडला और पूवh तट पर पाराaीप म7 आरओ-आरओ बथ(cid:14) सुिवधा6 का सृजन 9कया जाना चािहए। (cid:1) ओडीसी के रख-रखाव एवं पOरवहन हते ु बंदरगाह; तक सड़क संपक(cid:14) सुिनि?त 9कया जाना चािहए। 9999....5555 जजजजननननशशशशिििि____ आआआआवववव----यय यय ककककतततताााा िव(cid:3)ुत BेG के सभी BेG; के (cid:29)व Oरत िवकास हते ु &िशिBत जनशि| एक अिनवाय(cid:14) आव"य कता ह।ै इस BेG म7 Bमता अिभवृिH क(cid:11) अपार संभावनाए ं ह।- उ(cid:3)ोग जगत को इसका उ(cid:29)प ादन बढ़ान े और 12वP योजना के दौरान 1,0000 मेगावाट (कैिJटव और नवीकरणीय सिहत) से अिधक के लLय को पूरा करन े के िलए पOरयोजना 9UयाTव यन Bमता बढ़ान े हते ु कदम उठाने चािहए। &िशBण सुिवधा6 सिहत जनशि| िवकास इतनी बड़ी Bमता अिभवृिH आव"य कता के अनु4प होना चािहए। 9999....5555....1111 जजजजननननशशशशिििि____ आआआआवववव----यय यय ककककतततताााा ककककेेेे ििििललललएएएए ममममााााननननददददडडडडंंंं 12वP योजना के दौरान पOरयोजना िनमा(cid:14)ण, 9UयाTव यन और उ(cid:29)प ादन पOरयोजना6 के &चालन एवं रख रखाव के िलए जनशि| आव"य कता का मू_य ांकन करने हते ु कुछ मानदडं अपनाए गए ह।- िववरण नीचे 9दए अनसु ार ह - : ननननएएएए QQQQलल लल ााााटटंंटटंं **** ककककेेेे ििििननननममममााााणण!!णण!! हहहहततेेततेे ुुुु हाइ[ो - 10 (cid:15)य ि| &ित ममममगगेेगगेे ााााववववााााटटटट थम(cid:14)ल – 8 (cid:15)य ि| &ित ममममगगेेगगेे ााााववववााााटटटट Tय ूि*लयर – 8 (cid:15)य ि| &ित ममममेगेगेगेगााााववववााााटटटट पपपपIIIIररररययययोोोोजजजजननननाााा ((((KKKKययययााााCCCCवव वव ययययनननन अअअअववववििििधधधध हाइ[ो - 72 महीना थम(cid:14)ल - 36 महीना Tय ूि*लयर - 72 महीना उउउउ####पप पप ााााददददनननन पपपपIIIIररररययययोोोोजजजजननननाााा.... ककककेेेे &&&&चचचचााााललललनननन औऔऔऔरररर ररररखखखखररररखखखखाााावववव हहहहततेेततेे ुु ुु हाइ[ो - 1.9 (cid:15)य ि| &ित ममममगगेेगगेे ााााववववााााटटटट थम(cid:14)ल - 1.1 (cid:15)य ि| &ित ममममेगेगेगेगााााववववााााटटटट Tय ूि*लयर - 1.9 (cid:15)य ि| &ित ममममगगेेगगेे ााााववववााााटटटट 9999....5555....2222 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन जजजजननननशशशशिििि____ आआआआवववव----यय यय ककककतततताााा 12वP योजना के दौरान Bमता अिभवृिH का लLय लगभग 88,000 मेगावाट ह।ै यह अनुमान लगाया ह ै 9क उ(cid:29)प ादन, पारेषण और िवतरण पOरयोजना6 के &चालन और रख रखाव के िलए लगभग 4.54 लाख और िनमा(cid:14)ण के िलए 6.55 लाख अितOर*त काKमक; क(cid:11) आव"य कता होगी। 11वP योजना के दौरान िव(cid:3)ुत BेG म 7 िनमा(cid:14)ण के िलए लगाए गए काKमक 12वP योजना के दौरान भी िनमा(cid:14)ण आव"य कता को पूरा करने के िलए पया(cid:14)Jत ह;गे। 12वP योजना के दौरान अितOर*त जनशि| के <णे ीवार िववरण तािलका 9.10 म7 नीचे 9दए गए ह:-¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 207 ततततााााििििललललककककाााा ----9999....11110000 ====ेणेणेणेणीीीी &&&&चचचचााााललललनननन औऔऔऔरररर ििििननननममममााााणण!!णण!! जजजजोोोोड़ड़ड़ड़ ररररखखखखररररखखखखाााावववव इंजीिनयर 42000 36000 78000 पय(cid:14)वेBक 78000 49000 127000 कुल कामगार 63000 109000 172000 अH (cid:14)कुशल कामगार 68000 121000 189000 अकुशल कामगार 78000 219000 297000 गैर तकनीक(cid:11) 127000 121000 248000 जजजजोोोोड़ड़ड़ड़ ़़ ़़ 444455554444000000000000 666655555555000000000000 1111111100009999000000000000 िव(cid:3)ुत उ(cid:3)ोग के िलए मह(cid:29)व पूण(cid:14) आईटीआई Sेड िनXन ानसु ार ह - : ततततााााििििललललककककाााा 9999....11111111 LLLLेेेेडडडड ययययििूूििूू ननननटटटट**** कककक++++ सससस\\ंं\\ंं यय यय ाााा ववववाााा0000षषषषकककक इइइइननननटटटटेेककेेकक 9फटर 8,531 1,36,496 इलेि*Sिशयन 8,221 1,31,536 वे_ड र 1,068 17,088 वायरमैन 2,005 32,080 टन(cid:14)र 1,773 28,368 मेकेिनक 1,157 18,512 कारप7टर 475 7,600 शीट मेटल 285 4,560 मेसन 165 2,640 टूल और डाईमेकर 38 608 पलXब र 448 7,168 जोड़ 24,166 3,86,656 bोत: महािनदशे क (रोजगार एवं &िशBण) 40,000 औसत वाKषक आव"य कता अनुमान ह।ै 12वP योजना के दौरान &िशिBत जनशि| क(cid:11) भारी माGा म7 आव"य कता और व य् ापक &िशBण भार तथा िव(cid:3)ुत BGे म7 उभरकर सामन े आ रही उTन त &ौ(cid:3)ोिग9कय; को Qय ान म 7 रखत े Iए यह िसफाOरश क(cid:11) जाती ह ै 9क आधुिनक और वै‡ािनक काय(cid:14) &णािलय; को अपनाया जाए और आधुिनक अवसरं चना का सजृ न 9कया जाए। तदनसु ार आव"य क पाˆ सामNी तथा &िशBण सहायता &दान क(cid:11) जाए। इसके पOरणाम(cid:17)व 4प लागत और समय &भावी &िशBण 9दया जाएगा और यह &िशBण भार – अवसंरचना अंतराल को दरू करने म7 भी सहायक होगा। इस &कार क(cid:11) कुछ &िशBण काय(cid:14) &णािलय; के िववरण नीचे 9दए गए ह - : • संगठना(cid:29)म क/&िशBु क(cid:11) आव"य कता6 के अनुकूल िविभTन &कार के िसमुलेटर; के जOरए (अथा(cid:14)त एOरया िसमुलेटर, कंपे*ट िसमुलेटर, जेनOरक िसमुलेटर अथवा फुल-(cid:17)क ोप रेपिलका िसमुलेटर आ9द के जOरए)।208 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] • पावर (cid:17)ट ेशन/सब (cid:17)ट ेशन म7 Jल ांट िवशेष पर आधाOरत ऑन साइट &िशBण के जOरए। • पस(cid:14)नल कंJय ूटर आधाOरत (cid:17)व -अिधगम पैकेज &णािलय; के जOरए। • वीिडयो/सीडी/9फ_म ; के जOरए • मॉक-अप Jल ांट, मॉडल, Oरग, िजग लाइन-अप पैनल आ9द के जOरए। • पGाचार पाˆUम और दरू (cid:17)थ अिभगम पैकेज; के जOरए। • वा(cid:17)त िवक Jल ांट; अथवा पुराने/अ&चिलत उप(cid:17)क र; पर ‘ह‰- स-ऑन’’ &िशBण के जOरए रख रखाव संबंधी कौशल िवकास। • मामला अQय यन; के जOरए। • (cid:17)थ ानीय भाषा को िशBा का माQय म बनाते Iए &िशBण क(cid:11) (cid:15)य व(cid:17)थ ा करना और इन भाषा6 म7 पाˆ सामNी तैयार करना। 9999....6666 ििििननननििििधधधध आआआआवववव----यय यय ककककतततताााा 12वP योजना के दौरान लगभग 88,000 मेगावाट Bमता अिभवृिH के आधार पर उ(cid:29)प ादन पOरयोजना6 के िलए िनिध आव"य कता का मू_य ांकन/आकलन 9कया गया ह।ै िनिध आव"य कता का आकलन िपछली पOरयोजना6 क(cid:11) लागत के आधार पर िविभTन उ(cid:29)प ादन पOरयोजना6 के िलए &ित मेगावाट लागत अनुमान के आधार पर 9कया गया ह।ै उउउउ(cid:20)(cid:20)(cid:20)(cid:20)पप पप ााााददददनननन पपपप(cid:22)(cid:22)(cid:22)(cid:22)ररररययययोोोोजजजजननननाााा(cid:24)(cid:24)(cid:24)(cid:24) कककक5555 ललललाााागगगगतततत ककककेेेे अअअअननननममुुममुु ाााानननन हहहहततततेेेे ुु ुुपपपपववूूववूू ाााानन(cid:15)(cid:15)नन(cid:15)(cid:15) ममुुममुु ाााानननन7777 ककककेेेे ििििववववववववररररणणणण अअअअननननबबुुबबुु धधंंधधंं ----9999....1111 ककककेेेे 8888पपपप मममम (cid:13)(cid:13) (cid:13)(cid:13)----ददददएएएए गगगगएएएए हहहह 99 99 उपयु(cid:14)*त के आधार पर और 12वP योजना के दौरान लगभग 88,000 मेगावाट Bमता क(cid:11) अिभवृिH को Qय ान म7 रखते Iए 12वP योजना के दौरान उ(cid:29)प ादन पOरयोजना6 के िलए लगभग 4,13, 870 करोड़ tपए क(cid:11) िनिध आव"य कता का अनुमान लगाया गया ह।ै इसके अलावा 12वP योजना के दौरान 13वP योजना क(cid:11) पOरयोजना6 के संदभ(cid:14) म7 अिNम कार(cid:14)वाई शु4 करने के िलए भी िनिधय; क(cid:11) आव"य कता होगी। इसके िलए 2,72, 582 करोड़ tपए का अनमु ान लगाया गया ह।ै 12वP योजना के दौरान Bमता अिभवृिH के िलए कुल िनिध आव"य कता के िववरण िनXन ानसु ार ह - : ततततााााििििललललककककाााा 9999....11112222 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा अअअअििििभभभभववववििृृििृृ ???? ककककेेेे ििििललललएएएए ककककुुुुलललल ििििननननििििधधधध आआआआवववव---- यय ययककककतततताााा ििििननननििििधधधध आआआआवववव////यय यय ककककतततताााा ककककररररोोोोड़ड़ड़ड़ ;;;;पपपपएएएए मममम (cid:13)(cid:13) (cid:13)(cid:13) 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ििििललललएएएए ललललगगगगभभभभगगगग 88888888,,,,000000000000 ममममगगेेगगेे ााााववववााााटटटट कककक++++ (cid:26)(cid:26)(cid:26)(cid:26)ममममाााा अअअअििििभभभभववववििृृििृृ ???? 4444,,,,11113333,,,,888877770000 11113333वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा कककक++++ पपपपIIIIररररययययोोोोजजजजननननाााा.... ककककेेेे ििििललललएएएए अअअअििििFFFFमममम ककककाााारररर!!!!ववववााााईईईई 2222,,,,77772222,,,,555588882222 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन उउउउ####पप पप ााााददददनननन पपपपIIIIररररययययोोोोजजजजननननाााा.... ककककेेेे ििििललललएएएए ककककुुुुलललल ििििननननििििधधधध 6666,,,,88886666,,,,444455552222 आआआआवववव----यय यय ककककतततताााा 12वP योजना के दौरान उ(cid:29)प ादन पOरयोजना6 के िलए कुल िनिध आव"य कता 6,86,452 करोड़ tपए ह।ै इस िनिध आव"य कता म7 पावर Jल ांट; के नवीनीकरण और आधुिनक(cid:11)करण, कैिJटव और नवीकरणीय Bमता अिभवृिH के िलए आव"य क िनिधयां शािमल नहP ह।- पारेषण और िवतरण BेG के िलए भी इतनी ही िनिधय; क(cid:11) आव"य कता ह।ै ----------------++++++++++++----------------¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 209 अअअअननननबबुुबबुु धधंंधधंं 9999....1111 पपपपIIIIररररययययोोोोजजजजननननाााा.... कककक++++ ललललाााागगगगतततत ककककेेेे अअअअननननममुुममुु ाााानननन हहहहततेेततेे ुु ुुपपपपववूूववूू ाााानन!!नन!! ममुुममुु ाााानननन िव(cid:3)ुत प(cid:8)रयोजना(cid:15) क(cid:17) अनमु ािनत लागत के िलए पूवा(cid:25)नमु ान ((((आआआआककंंककंं ड़ड़ड़ड़ ेे ेे <<<<िििितततत ममममेगेगेगेगााााववववााााटटटट ककककररररोोोोड़ड़ड़ड़ ;;;;पपपपएएएए मममम))(cid:13)(cid:13)))(cid:13)(cid:13) U.सं. उ(cid:29)प ादन योजना का &कार लागत 1 थम(cid:14)ल उ(cid:29)प ादन पOरयोजनाए ं 6 2 हाइ[ो उ(cid:29)प ादन पOरयोजनाए ं 8 3 Tय िू *लयर पOरयोजनाए ं 10 4 कैिJटव 5 5 सौर 13 6 पवन 6 7 अTय नवीकरणीय ऊजा(cid:14) bोत 5 *उपयु(cid:25)(cid:27)त लागत(cid:28) िव(cid:29)त वष(cid:25) 2011-12 के मू(cid:31)य त र! पर आधा(cid:8)रत ह।% # 10% पूवy(cid:29)त र BेG क(cid:11) पOरयोजना6 के िलए 10% अिधक लागत का पूवा(cid:14)नुमान लगाया गया ह।ै210 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] अअअअ(cid:2)(cid:2)(cid:2)(cid:2)यय यय ाााायययय 11110000 ररररााााBBBBयय यय **** llllाााारररराााा एएएएकककक++++ककककृृृृतततत आआआआययययोोोोजजजजननननाााा 11110000....0000 पपपपृRृRृRृRठठ ठठ भभभभििूूििूू मममम भारत सरकार न े िव(cid:3)तु BGे के समB िविभTन सम(cid:17)य ा6 को दरू करन े के िलए तथा अिधक स9Uय बाजार आधाOरत पहल अपनान े के िलए बIत से &यास शु4 9कए ह।- इनम7 िव(cid:3)ुत कंपिनय; के ढांचे म7 पOरवत(cid:14)न से लेकर &चालन पOरवेश और िव(cid:3)ुत BेG के िलए लागू िवधायी और िनयामक ढांचे शािमल ह।- सवा(cid:14)िधक मह(cid:29)व पूण(cid:14) पOरवत(cid:14)न के 4प म7 उ(cid:29)प ादन, पारेषण और िवतरण के ऊQव ा(cid:14)धर 4प स े एक(cid:11)कृत कारोबार को िवभािजत करना और िव(cid:3)ुत उ(cid:29)प ादन, पारेषण और िवतरण म7 िनजी BGे का &वेश िवशेष 4प उ_ लेखनीय ह।ै इन &यास; के पOरणाम(cid:17)व 4प Bमता अिभवृिH काय(cid:14)Uम म 7 अभूतपूव(cid:14) वृिH के िलए एक Jल ेटफाम(cid:14) तैयार करन े और Nामीण पOरवार; सिहत सभी को िव(cid:3)ुत उपल+ध कराने क(cid:11) अपेBा ह।ै िव(cid:3)ुत अिधिनयम, 2003 म7 ढांचागत सुधार;, डी-लाइस7Dसग, Nामीण िव(cid:3)तु ीकरण पर जोर, सुधार करन े वाल े रा/य ; के िलए &ो(cid:29)स ाहन और सवा(cid:14)िधक मह(cid:29)व पूण(cid:14) िव(cid:3)ुत क(cid:11) चोरी के िलए कठोर दडं के &ावधान सिहत अिनवाय (cid:14) मीट€रग जैसे मजबतू कदम उठाने क(cid:11) पOरक_प ना क(cid:11) गई ह।ै राRS ीय िव(cid:3)ुत नीित और टैOरफ नीित म7 भी ऐस े 9दशािनदशl जारी 9कए गए ह - 9क िव(cid:3)तु BेG का िवकास और &चालन िव(cid:3)तु अिधिनयम के &ावधान; के अनुसार 9कया जाए। पूव(cid:14)वतh रा/य िव(cid:3)ुत बोडV को अलग उ(cid:29)प ादन, पारेषण और िवतरण कंपिनय; के 4प म7 िवभािजत 9कया गया ह।ै जहां एक ओर इस &यास के िव(cid:3)ुत (cid:15)य वसाय को आKथक 4प से (cid:15)य वहाय(cid:14) बनाने म7 कारगर िसH होने क(cid:11) अपेBा ह,ै वहP दसू री ओर उ(cid:29)प ादन से लेकर अंितम &यो*त ा के बीच संपूण(cid:14) िव(cid:3)ुत <ृंखला क(cid:11) एक(cid:11)कृत आयोजना तैयार lqfuf’pr करने म 7 रा/य ; क(cid:11) बIत ही मह(cid:29)व पूण(cid:14) भूिमका ह ै और इस &कार रा/य ; को यह करना ह ै 9क मौजूदा &णािलयां पया(cid:14)Jत ह; और िनधा(cid:14)Oरत समयाविध के भीतर उनक(cid:11) (cid:17)थ ापना क(cid:11) जाए। इस अQय ाय म7 &(cid:29)य ेक रा/य aारा िव(cid:17)त तृ ढंग से क(cid:11) जान े वाली आयोजना के िववरण 9दए गए ह।- 11110000....1111 ररररााााBBBBयय यय ििििवववव(cid:25)(cid:25)(cid:25)(cid:25)ततुुततुु बबबबोोोोडडडड !! !!ककककाााा ससससजजृृजजृृ नननन दशे म7 िव(cid:3)ुत आपूKत उ(cid:3)ोग क(cid:11) शुtआत िनजी उ(cid:3)मशील &यास के जOरए क(cid:11) गई और सैHांितक 4प से उ(cid:29)प ादन Jल ांट; क(cid:11) (cid:17)थ ापना लोड केTe ; के समीप क(cid:11) गई। आपूKत क(cid:11) िमत(cid:15)य ियता और िवशव् सनीय बढ़ान े के िलए एकातं ि(cid:17)थत उ(cid:29)प ादन यूिनट; के &चालन और उTह 7 िNड &णािलय; से जोड़ने क(cid:11) आव"य कता 40 के दशक म7 महसूस क(cid:11) गई। िव(cid:3)ुत अिधिनयम, 1948 के अिधिनयमन के साथ िव(cid:3)ुत आपूKत उ(cid:3)ोग के पुनगठ(cid:14) न हते ु एक िव(cid:17)त ृत िवधान तैयार 9कया गया। इस अिधिनयम म7 रा/य िव(cid:3)ुत बोडV (एसईबी) के सृजन का &ावधान 9कया गया और उTह 7 दB एवं िमत(cid:15)य यी ढंग से उ(cid:29)प ादन और आपूKत के संवध(cid:14)न और दशे म7 िव(cid:3)तु आपूKत सुिवधा6 के िवकास क(cid:11) िजXम ेदारी सkपी गई। उस दौर म7 िव(cid:3)ुत के िवकास के िलए िनजी BेG क(cid:11) भूिमका न के बराबर थी और केवल अहमदाबाद, कलक(cid:29)त ा और बॉXब े म7 ही िनजी BेG के उ(cid:3)मी इससे जुड़ े थे। 11110000....2222 ििििवववव(cid:25)(cid:25)(cid:25)(cid:25)ततुुततुु अअअअििििधधधधििििननननययययमममम,,,, 2222000000003333 औऔऔऔरररर ररररााााRRRRLL LL ीीीीयययय ििििवववव(cid:25)(cid:25)(cid:25)(cid:25)ततुुततुु ननननीीीीिििितततत िव(cid:3)ुत अिधिनयम, 2003 के अिधिनयमन का उZ"े य िवगत समय म7 िव(cid:3)ुत BेG के समB मौजूदा िवकराल सम(cid:17)य ा6 का समाधान करना था। अिधिनयम के अंतगत(cid:14) उपभो*त ा6 के साथ-साथ िव(cid:3)ुत के आपूKतकता(cid:14)6 के n`f िहत; को Qय ान म7 रखते Iए बाजार क(cid:11) Rट से अनुकूल वातावरण म7 िव(cid:3)ुत BेG के िवकास क(cid:11) पOरक_प ना क(cid:11) गई ह।ै उ(cid:29)प ादन के लाइस7स भंग 9कए गए ह - और पारेषण और िवतरण BेG म7 मु* त अिधगम का िवलेख 9कया गया ह।ै राRS ीय िव(cid:3)ुत नीित िव(cid:3)ुत BेG को अपेिBत मह(cid:29)व 9दलाने क(cid:11) 9दशा म 7 अिधिनयम के 9UयाTव यन को सकु र बनाने के िलए एक काया(cid:14)(cid:29)म क (लीवर) उपाय के 4प म7 तैयार क(cid:11) गई। िव(cid:3)ुत अिधिनयम, 2003 क(cid:11) धारा 3 (4) के अंतग(cid:14)त केTe ीय िव(cid:3)ुत &ािधकरण को राRS ीय िव(cid:3)ुत नीित के अनुसार राRS ीय िव(cid:3)ुत योजना तैयार करने के िलए अिधदिे शत 9कया गया ह।ै राRS ीय िव(cid:3)ुत योजना स े वा(cid:17)त िवक संदभ(cid:14) म7 िव(cid:3)ुत अिधिनयम, 2003 के कायाT(cid:14) व यन को सुकर बनान े वाल े एक साथ(cid:14)क उपाय के 4प म7¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 211 काय(cid:14) करने क(cid:11) अपेBा ह।ै सीईए aारा तैयार क(cid:11) गई मसौदा योजना को सभी पणधारक; को पOरचािलत 9कया गया ह ै साथ ही सभी लोग; से OटJप िणयां आमंिGत करने हते ु इसे सीईए क(cid:11) वेबसाइट पर भी अपलोड 9कया गया ह।ै &ाJत उपयु*त OटJप िणय; के आधार पर योजना को अिं तम 4प 9दया गया ह।ै राRS ीय िव(cid:3)ुत योजना िव(cid:3)तु BेG क(cid:11) इRट तम वृिH क(cid:11) 9दशा म7 एक रोड मैप के 4प म7 काय(cid:14) करने हते ु तैयार क(cid:11) गई ह।ै यह एक(cid:11)कृत संसाधन आयोजना पहल पर आधाOरत ह,ै िजससे 9क पहल े स े 9कए गए िनवेश सिहत सभी संसाधन; का अिधकतम सदपु योग 9कया जा सके। यह योजना सीईए के पास उपल+ध आधुिनक उ(cid:29)प ादन आयोजना सॉ{टवेयर मॉडल; का &योग करत े Iए 9कए गए िव(cid:17)त ृत अQय यन; के पOरणाम(cid:17)व 4प तैयार क(cid:11) गई ह।ै इस पOरयोजना म7 Bमता अिभवृिH के पOरयोजनावार िववरण के साथ-साथ &(cid:29)य ेक पOरयोजना के dधन &कार आ9द क(cid:11) जानकारी दी गई। योजना म 7 उ(cid:29)प ादन के साथ-साथ पारेषण संबंधी पहलु6 को भी शािमल 9कया गया ह।ै 11110000....3333 ििििवववव(cid:25)(cid:25)(cid:25)(cid:25)ततुुततुु (cid:26)(cid:26)(cid:26)(cid:26)(cid:27)(cid:27)ेे(cid:27)(cid:27)ेे ककककाााा पपपपननुुननुु गगगगठठ!!ठठ!! नननन 50 के दशक म7 रा/य िव(cid:3)ुत बोडV (एसईबीएस) का सृजन िव(cid:3)ुत BेG के िवकास के िलए अ(cid:29)य िधक लाभकर कदम था। &(cid:29)य ेक रा/य ने पावर Jल ांट से लेकर पारेषण और िवतरण नेटवक(cid:14) के िलए अपनी-अपनी एक(cid:11)कृत &णाली िवकिसत क(cid:11)। इसके पOरणाम(cid:17)व 4प दशे के (cid:17)थ ािनक 4प से िवतOरत BेG; म7 िव(cid:3)ुत अिभगम को सुकर बनाया जा सका। तथािप समय के साथ रा/य िव(cid:3)ुत बोडV का िनRप ादन लड़खड़ाया और व े धीरे-धीरे हािनया ं बढ़ने के कारण n`f आKथक Rट से अ(cid:15)य वहाय(cid:14) हो गए। इसके पOरणाम(cid:17)व 4प उनक(cid:11) िवकासा(cid:29)म क योजनाए ं बुरी तरह &भािवत Id और रा/य ; के समB िव(cid:3)ुत क(cid:11) कमी धीरे-धीरे बढ़ने लगी। इसके पOरणाम(cid:17)व 4प सरकार रा/य िव(cid:3)ुत बोडV को उ(cid:29)प ादन, पारेषण और िवतरण कंपिनय; के 4प म7 िवभािजत करने के िलए बाQय हो गई और &(cid:29) यके कंपनी को एक अलग िव(cid:29)त ीय िनकाय के 4प म7 (cid:17)थ ािपत क(cid:11) गई। &(cid:29)य ेक रा/य म 7 िनयामक आयोग; का भी गठन 9कया गया, िजनके िनयामक पय(cid:14)वेBण और माग(cid:14)दश(cid:14)न म7 &(cid:29)य ेक रा/य का &चालन और िवकास 9कया गया। रा/य िव(cid:3)तु बोडV को भंग करन े के प"च ात महसूस क(cid:11) गई &मुख सम(cid:17)य ा यह ह ै 9क च9ूं क &(cid:29)य ेक रा/य म 7 उ(cid:29)प ादन, पारेषण, िवतरण अलग-अलग कॉपyरेशन; के अधीन ह,- अत: /य ादातर रा/य ; म7 अ_प कािलक अथवा दीघ(cid:14)कािलक योजनाए ं समिTवत ढंग स े तैयार नहP क(cid:11) जा रही ह।- इसे दशे म 7 संपणू (cid:14) िव(cid:3)ुत पOरद"ृ य के िलए अ(cid:29)य िधक &ितकूल ि(cid:17)थित के 4प म7 दखे ा जाता ह।ै पहले, &(cid:29)य ेक रा/य म7 िव(cid:3)ुत BेG का िवकास सीईए aारा क(cid:11) जा रही आयोजना कार(cid:14)वाई के अनुसार 9कया जाता था। हालां9क, िव(cid:3)तु अिधिनयम, 2003 के अिधिनयम के प"च ात 9कसी पावर Jल ांट के िवकासकता(cid:14) को एक f’pr िन िव(cid:29)त ीय सीमा से नीचे वाले थम(cid:14)ल अथवा हाइ[ो पावर Jल ांट क(cid:11) (cid:17)थ ापना के िलए सीईए से कोई (cid:17)व ीकृित &ाJत करना आव"य क नहP ह।ै अत: /य ादातर रा/य ; के पास कोई िनयिमत आयोजना िसHांत अथवा अपने &णाली के िलए िवकासा(cid:29)म क योजनाए ं नहP ह।- 11110000....4444 ररररााााBBBBयय यय **** मममम 66 66ससससममममििििCCCCववववतततत आआआआययययोोोोजजजजननननाााा कककक++++ आआआआवववव----यय यय ककककतततताााा &(cid:29)य ेक रा/य म7 उ(cid:29)प ादन पारेषण और िवतरण &णाली के संदभ(cid:14) म7 समिTवत आयोजना आव"य क ह।ै &(cid:29)य ेक रा/य के िलए अ_प कािलक और दीघ(cid:14)कािलक योजनाए ं तैयार करने क(cid:11) आव"य कता ह।ै इसके कुछ िविशRट कारण िनXन ानुसार ह - : क) &(cid:29)य ेक रा/य म7 अलग-अलग लोड िड(cid:17)प ैच कव(cid:14) ह,ै िजसे आधारभूत लोड के साथ-साथ पीqकग पावर Jल ांट; क(cid:11) aारा पूरा 9कया जा सकता ह।ै अत: &(cid:29)य ेक रा/य से यह अपेBा क(cid:11) जाती ह ै 9क व े यहां तक 9क राRS ीय िNड क(cid:11) (cid:17)थ ापना के बाद भी पया(cid:14)Jत आधारभूत लोड के साथ-साथ पीqकग उ(cid:29)प ादन Bमता (cid:17)थ ािपत कर7। 10 वष (cid:14) क(cid:11) अविध वाली दीघ(cid:14)कािलक योजनाए ं अ(cid:29)य िधक मह(cid:29)व पूण(cid:14) ह - *य ;9क कुछ िव(cid:3)ुत पOरयोजना6, िवशेष 4प स े हाइ[ो पOरयोजना6 क(cid:11) (cid:17)थ ापना म7 काफ(cid:11) लंबा समय लगता ह।ै साथ ही f’pr आयोजना &9Uया म7 यह सुिन करने क(cid:11) आव"य कता ह ै 9क रन ऑफ Oरवर पOरयोजना6 क(cid:11) तुलना212 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] म7 भंडारण &कार क(cid:11) जल िव(cid:3)ुत पOरयोजना6 के िलए संभािवत (cid:17)थ ल; पर इनका िनमा(cid:14)ण 9कया जाए *य ;9क ये पOरयोजनाए ं पीqकग पावर उपल+ध कराती ह।- ख) उ(cid:29)प ादन पOरयोजना स े सबं H पया(cid:14)Jत पारेषण नेटवक(cid:14) उतनी ही समयाविध म 7 (cid:17)थ ािपत करन े क(cid:11) आव"य कता ह।ै इसके अलावा चूं9क मु*त अिभगम के िलए अिधिनयम और नीितगत &ावधान 9कए गए ह,- अत: आव"य कतानुसार सभी उपभो*त ा6 को मु*त अिभगम सुिनि?त करने के िलए पया(cid:14)Jत पारेषण Bमता सृिजत करने क(cid:11) ज4रत ह।ै ग) य(cid:3)िप िवतरण रा/य के अिधकार BेG म7 आने वाला िवषय है, 9फर भी उ(cid:29)प ादन तथा पारेषण &णाली के अनु4प इसके िलए समिTवत आयोजना आव"य क ह।ै चूं9क अिधिनयम म7 िव"व सनीय िव(cid:3)ुत आपूKत के िलए बIत ही कठोर &ावधान 9कए गए ह,- अत: िवतरण &णाली के िलए भी आयोजना तैयार क(cid:11) जाए। िव(cid:3)ुत अिधिनयम, 2003 के अनुसार िवतरण कंपनी का यह &ाथिमक दािय(cid:29)व ह ै 9क वह अ_प कािलक और दीघ(cid:14)कािलक अQय यन; के आधार पर अपने िवतरण नेटवक(cid:14) का िवकास करे, िजससे Tय ूनतम लागत समाधान उपल+ध करान े के िलए &णाली नेटवक(cid:14) को उपयु*त ् बनाया जा सके, आईई िनयमावली के f’pr अनुसार िनधा(cid:14)Oरत सीमा6 म7 िविभTन नोड; पर वो_ट ेज सुिन 9कया जा सके, िवतरण नेटवक(cid:14) म 7 ऊजा(cid:14) हािन को कम 9कया जा सके और िव(cid:3)ुत आपूKत क(cid:11) गुणव(cid:29)त ा और िव"व सनीयता म7 सुधार 9कया जा सके। एक ही BेG म7 बIत सी एज7िसया ं होने के कारण उपयु(cid:14)*त लLय ; को पूरा करन े के िलए एक(cid:11)कृत f’pr आयोजना सुिन करने हते ु केवल एक एज7सी के िवक_प क(cid:11) आव"य कता ह।ै यह एज7सी उ(cid:29)प ादन, पारेषण, िवतरण और अTय एज7िसय;, य9द कोई ह,- के साथ समTव य (cid:17)थ ािपत करेगी। इससे एक सुदढ़ृ , सवा(cid:14)िधक 9कफायती और िव"व सनीय &णाली का िवकास सुकर होगा। घ) लागत और लाभ; पर िवचार करने के प"च ात, नेटवक(cid:14) सूचना और क(cid:17)ट मर डटे ाबेस के सृजन को सुकर बनाने के िलए िवतरण कंपिनय; aारा &ाथिमकता के आधार पर आधुिनक सचू ना &ौ(cid:3)ोिगक(cid:11)य &णािलय; का काया(cid:14)Tव यन आव"य क ह।ै यह लोड &बंधन, गुणव(cid:29)त ा म7 सुधार चोरी और छेड़छाड़ क(cid:11) घटना6 का पता लगाने, उपभो*त ा सूचना और उिचत तथा सही िबDलग और वसूली म7 सहायक ह;गी। 11110000....5555 एएएएकककक++++ककककृृृृतततत आआआआययययोोोोजजजजननननाााा ककककेेेे ििििललललएएएए &&&&####यय यय ककेेककेे ररररााााBBBBयय यय मममम 66 66एएएएककककलललल एएएएजजजजसस66सस66 ीीीी ककककाााा &&&&''''तत तत ाााावववव औऔऔऔरररर ििििससससफफफफााााIIIIररररशशशश िव(cid:3)ुत &णाली के सभी पहलु6 को शािमल करते Iए &(cid:29)य ेक रा/य म7 समिTवत आयोजना को सुकर बनाने के उZ"े य यह आव"य क ह ै 9क &(cid:29)य ेक रा/य म7 इस &योजन से एकल नोडल एज7सी िनय*ु त क(cid:11) जाए। इस एजस7 ी को &(cid:29)य ेक रा/य aारा नािमत 9कया जाएगा। यह एजस7 ी रा/य के ऊजा(cid:14) िवभाग aारा अपने कायV के िनRप ादन क(cid:11) दिृ n से &भावी िसH होगी। अिधिनयम के अनुसार एसटीयू को संगत रा/य ; म7 आयोजना के िलए नािमत 9कया गया ह।ै सीईए इस नोडल एज7सी के िलए परामश(cid:14)दाता के 4प म7 काय(cid:14) करेगा *य ;9क इसके पास आयोजना के िलए आव"य क िवशेष‡ता ह ै और सीईए के पास इस &योजन स े आव"य क उपयु*त सॉ{टवेयर आयोजना टूल उपल+ध ह।-¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 213 अअअअ(cid:2)(cid:2)(cid:2)(cid:2)यय यय ाााायययय 11111111 GGGGधधधधनननन आआआआवववव----यय यय ककककतततताााा 11111111....0000 &&&&''''तत तत ााााववववननननाााा f’pr िव(cid:3)ुत पOरयोजना6 के काया(cid:14)Tव यन से पहल े िव(cid:3)तु पOरयोजना के िलए dधन क(cid:11) उपल+ध ता सुिन करना आव"य क ह ै *य ;9क यह िव(cid:3)ुत पOरयोजना के िलए आव"य क एक मुjय इनपुट ह।ै भारतीय िव(cid:3)ुत BेG के िलए कोयला मुjय dधन ह ै और ऐसी संभावना ह ै 9क आगामी कुछ पंचवषhय योजना6 म7 भी कोयला िव(cid:3)ुत BेG के िलए &मुख आव"य क dधन के 4प म7 बना रहगे ा। अत: यह एक िनतातं आव"य क पहलू ह ै 9क िव(cid:3)तु के उ(cid:29)प ादन के िलए dधन के 4प म7 &यु*त कोयले क(cid:11) पया(cid:14)Jत माGा म7 उपल+ध ता सुिनि?त करने पर िवचार करने क(cid:11) आव"य कता ह।ै कोयले क(cid:11) अपया(cid:14)Jत उपल+ध ता स े उ(cid:29)प ादन Bमता &भािवत होगी और िव(cid:3)तु BेG म 7 9कए गए अंतKनिहत पूंजी (cid:15)य य के साथ साथ भारत म7 िव(cid:3)ुत क(cid:11) कमी क(cid:11) मौजूदा ि(cid:17)थित और अिधक गंभीर हो जाएगी। बIत से मौजूदा पावर Jल ांट; म7 पया(cid:14)Jत माGा म7 कोयला उपल+ध न होने के कारण उ(cid:29) पादन हािन हो रही ह।ै अत: िव(cid:3)ुत उ(cid:29)प ादन के िलए कोयले का आयात एक अिनवाय(cid:14) आव"य कता ह।ै dधन सिहत सभी आव"य क इनपुट क(cid:11) समय पर आपूKत से यह सुिनि"च त होगा 9क पOरयोजना समय पर पूरी होगी और िव(cid:3)ुत पOरयोजना म7 िवलंब के मामले म7 लागत तथा समयाविध बढ़ने क(cid:11) &ितकूल िववBाए ं भी उ(cid:29)प Tन नहP ह;गी। इस अQय ाय म 7 11वP योजना के दौरान dधन क(cid:11) उपल+ध ता क(cid:11) िव(cid:17)त तृ समीBा क(cid:11) गई है, इसम7 12वP योजना के िलए dधन क(cid:11) आव"य कता के मू_य ांकन और 13वP योजना के िलए साकं ेितक आव"य कता के साथ साथ ऐस े मह(cid:29)व पूण(cid:14) मुZ;, िजनका समाधान 9कया जाना आव"य क ह/ै कोयला BेG के समB मौजूदा बाधा6 पर चचा(cid:14) क(cid:11) गई ह।ै इस अQय ाय म7 अTय मंGालय; और उ(cid:3)ोग जगत के िलए पया(cid:14)Jत इनपुट उपल+ध ह,ै िजससे वे िव(cid:3)तु BेG क(cid:11) आव"य कता के अनुसार अपने उ(cid:29)प ादन लLय ; आ9द क(cid:11) आयोजना तैयार कर सकते ह - और उसे पूरा करने के िलए आव"य क कार(cid:14)वाई कर सकते ह।- 11111111....1111 ककककोोोोययययलललल ेे ेेकककक++++ आआआआवववव----यय यय ककककतततताााा 11111111....1111....1111 कोयला भारत के ऊजा(cid:14) BेG का मुjय आधार ह ै और इसक(cid:11) िह(cid:17)स ेदारी &ाथिमक वािणि/यक ऊजा(cid:14) आपूKत के 50% से अिधक ह।ै 31.3.2012 क(cid:11) ि(cid:17)थित के अनुसार दशे क(cid:11) कुल िव(cid:3)ुत उ(cid:29)प ादन Bमता (यूOटिलटी) लगभग 1,99877 मेगावाट ह,ै िजसम7 से लगभग 1,12022 मेगावाट (56%) कोयला आधाOरत पावर Jल ांट; से उ(cid:29)प Tन क(cid:11) जाती ह।ै दशे म 7 उ(cid:29)प ा9दत कुल िव(cid:3)तु म7 स े लगभग 70% िव(cid:3)ुत कोयला आधाOरत थम(cid:14)ल पावर (cid:17)ट ेशन; स े उ(cid:29)प Tन क(cid:11) जाती ह ै जब9क कुल (cid:17)थ ािपत Bमता म7 इसक(cid:11) िह(cid:17)स ेदारी माG 56% ह।ै िव(cid:3)ुत मंGालय aारा 9कए जा रह े िविभTन &यास; को Qय ान म7 रखते Iए दशे मे थम(cid:14)ल पावर (cid:17)ट ेशन; के Jल ांट लोड फै*ट र (पीएलएफ) म7 िपछले कुछ वषV म7 बड़ी तेजी से सधु ार हो रहा ह।ै वष(cid:14) 1992-93 म7 57.1% से बढ़कर 2011-12 म7 Jल ांट लोड फै*ट र 77.32% हो गया ह।ै इसके पOरणाम(cid:17)व 4प &ित मेगावाट (cid:17)थ ािपत Bमता के अन4ु प कोयले क(cid:11) मांग भी बढ़ गई ह।ै हालां9क dधन क(cid:11) सम(cid:17)य ा6 के कारण कोयला आधाOरत Jल ांट; का पीएलएफ घट रहा ह।ै कोयले क(cid:11) मांग और घरेलू आपूKत के बीच बढ़ रह े अंतराल को Qय ान म7 रखते Iए यह आव"य क हो गया ह।ै साव(cid:14)जिनक BेG और िनजी BेG दोन; म7 घरेलू उ(cid:29)प ादन का िव(cid:17)त ार 9कया जाए और 11वP योजना के दौरान इस BेG म7 &ित(cid:17)प धा(cid:14) बढ़ाकर दBता लाभ &ाJत करने के िलए सुधार &9Uया6 को तेजी से लागू 9कया जाए। 11111111....1111....2222 सरकार ने नई कोयला िवतरण नीित (एनसीडीपी) लागू क(cid:11) ह,ै िजसके अंतग(cid:14)त कुछ <ेिणय; के उपभो*त ा6 को पहले से िनधा(cid:14)Oरत क(cid:11)मत; पर आपूKत सिु नि?त क(cid:11) जाती ह ै और सामNी के िलए बेहतर बाजार &ो(cid:29)स ािहत करने के उZ"े य से ई-नीलामी को भी पुन: श4ु 9कया गया ह।ै 1 अ&ैल, 2009 स े लागू इस नीित क(cid:11) &मुख िवशेषताए ं िनXन ानसु ार ह:- – िव(cid:3)ुत कंपिनय; को आपूKत के िलए कोयले क(cid:11) 100% सामाTय ीकृत आव"य कता पर िवचार 9कया जाएगा। – कोल इंिडया िलिमटेड aारा अिधसूिचत मू_य पर वािणि/यक 4प से &वत(cid:14)नीय dधन आपूKत करार (एफएसए) के जOरए कोयल े क(cid:11) आपूKत।214 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] – सीआईएल के वाKषक उ(cid:29)प ादन का 10% भाग ई नीलामी के जOरए उन उपभो*त ा6 को &(cid:17)त ािवत 9कया जाए जो उपल+ध सं(cid:17)थ ागत (cid:15)य व(cid:17)थ ा के माQय म से कोयला &ाJत करन े म7 सBम नहP ह।- – एफएसए म7 पूरे वष(cid:14) के दौरान कोयला कंपिनय; aारा िव(cid:3)ुत कंपिनय; को आपूत(cid:14) 9कए जाने वाले कोयले क(cid:11) वाKषक संिवदागत माGा (एसी*य ू) दशा(cid:14)यी जाए। 33331111 ममममााााचचचच,,!!,,!! 2222000000009999 ककककेेेे पपपप----चच चच ाााातततत ''''थथ थथ ााााििििपपपपतततत ययययििूूििूू ननननटटटट**** ककककेेेे ििििललललएएएए GGGGधधधधनननन आआआआपपपप00ूू00ूू तततत ककककरररराााारररर ((((एएएएफफफफएएएएससससएएएए)))) पपपपरररर हहहह''''तत तत ाााा(cid:26)(cid:26)(cid:26)(cid:26)रररर :::: 31 माच,(cid:14) 2009 से पहल े (cid:17)थ ािपत थम(cid:14)ल पावर Jल ांट; के िलए वाKषक संिवदागत माGा (एसी*य ू) के 90% OSगर मू_य के साथ एफएसए पर ह(cid:17)त ाBर 9कए गए। 31 माच(cid:14), 2009 के बाद (cid:17)थ ािपत थम(cid:14)ल पावर Jल ांट; के िलए ह(cid:17)त ाBर नहP 9कए गए ह - *य ;9क सीआईएल &ाथिमक 4प से िनXन िलिखत के िलए जोर द े रहा ह:ै (क) सुिनि?त आपूKत को एलओए के 50% से कम रखना और (ख) एफएसए पर 5 वष(cid:14) के िलए ह(cid:17)त ाBर करना। 85% पीएलएफ के साथ सामाTय त: नए पावर Jल ांट; के िलए एलओए से 25 वष (cid:14) के िलए िव(cid:3)ुत क(cid:11) आपूKत हते ु िव(cid:3)ुत खरीद करार (पीपीए) करन े वाले उ(cid:29)प ादन (cid:17)ट ेशन; के संदभ(cid:14) म7 5 वष (cid:14) के िलए 42.5% क(cid:11) संगत कोयला आपूKत सुिनि?त होगी। िव(cid:3)ुत मंGालय न े 31 माच(cid:14), 2009 के बाद (cid:17)थ ािपत क(cid:11) गई पOरयोजना6 के िलए एफएसए पर ह(cid:17)त ाBर करन े हते ु मामले को कोयला मंGालय के साथ उठाया। क(cid:11)मत क(cid:11) पूDलग िवषयक संक_प ना के िलए भी बातचीत क(cid:11) जा रही ह।ै 11111111....1111....3333 ककककोोोोययययललललाााा ''''टट टट ॉॉॉॉnnnnककककगगगग ममममााााननननददददडडडडंंंं : सिचव, योजना आयोग क(cid:11) अQय Bता म 7 गOठत क(cid:11) गई एक सिमित aारा पावर Jल ांट स े िपट हडे क(cid:11) दरू ी के आधार पर पावर (cid:17)ट ेशन; के िलए यथािनधा(cid:14)Oरत कोयला (cid:17)ट ॉqकग मानदडं ; के िववरण नीचे 9दए गए ह:- • िपट हडे (cid:17)ट ेशन 15 9दन का (cid:17)ट ॉक • कोयला खदान से 500 9कलोमीटर क(cid:11) दरू ी तक 20 9दन का (cid:17)ट ॉक • कोयला खदान से 1000 9कलोमीटर क(cid:11) दरू ी तक 25 9दन का (cid:17)ट ॉक • कोयला खदान से 1000 9कलोमीटर से अिधक दरू ी के िलए 30 9दन का (cid:17)ट ॉक 11111111....1111....4444 ककककोोोोययययलललल ेे ेेककककाााा आआआआययययाााातततत पहले िव(cid:3)ुत कंपिनय; को पया(cid:14)वरण और वन मंGालय के अनुदशे ; का अनुपालन सुिनि?त करने के उZ"े य स े कोयला आया त करने क(cid:11) सलाह दी गई थी और यह अपेBा क(cid:11) गई थी 9क 34% कम ऐश माGा वाले कोयले का &योग 9कया जाए तथा कभी कभी आयाितत कोयले के पूरक के 4प म7 (cid:17)व दशे ी bोत; से &ाJत कोयले का भी इ(cid:17)त ेमाल 9कया जाए। पूव(cid:14)वतh वषV के दौरान पावर (cid:17)ट ेशन; aारा आयात 9कए गए कोयले क(cid:11) माGा नीचे दी गई ह ै : (ििििममममििििललललययययनननन टटटटनननन मममम)6666 ववववषषषष !!!! ललललggggयय यय ववववाााा''''तत तत ििििववववकककक 2004-05 10.0 4.5 2005-06 13.5 10.4 2006-07 20.0 9.7 2007-08 12.0 10.2 2008-09 20.0 16.1 2009-10 28.7 24.6 2010-11 47.0 30.5 2011-12 55.0 44.9¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 215 ऊपर 9कए गए घरेलू कोयले क(cid:11) मांग-आपूKत िव"ल ेषण के अनुसार 12वP पंचवषhय योजना के अंत तक नॉन- कोqकग कोयले का आयात बढ़ने क(cid:11) संभावना ह।ै िव(cid:3)ुत BेG क(cid:11) मांग को पूरा करन े के िलए यह आव"य क भी ह।ै वत(cid:14)मान पोट(cid:14) Bमता के आधार पर 55 9कलो टन कोयले का रख-रखाव 9कया जा सकता ह ै और पूवा(cid:14)नुमान के अनुसार कोयले का आयात बढ़ाए जाने क(cid:11) ि(cid:17)थित म7 पोट(cid:14) Bमता का भी िव(cid:17)त ार करना आव"य क होगा। इसके अलावा आयात 9कए गए कोयले का &योग घरेलू कोयले के साथ िमि<त 4प से भी 9कया जा सकता ह ै और इसस े घरेलू कोयले को धोने क(cid:11) भी आव"य कता नहP पड़गे ी और पया(cid:14)वरण और वन मंGालय के अनुदशे ; का अनुपालन f’pr सुिन करन े के िलए पावर (cid:17)ट ेशन; को यह आव"य क भी ह।ै ऐसी ि(cid:17)थित म7 वाशरी से िनकलन े वाले अपिशRट पदाथV के रख रखाव क(cid:11) सम(cid:17)य ा भी हल हो जाएगी। हालां9क, आयात 9कए गए कोयले क(cid:11) उ5च लागत का पावर टैOरफ पर &ितकूल &भाव पड़गे ा। 11111111....1111....5555 (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा अअअअििििभभभभववववििृृििृृ ???? ककककााााययययKK!!KK!! मममम औऔऔऔरररर ककककोोोोययययलललल ेे ेेकककक++++ आआआआवववव----यय यय ककककतततताााा मौजूदा/नए (cid:17)थ ािपत पावर Jल ांट; के िलए पया(cid:14)Jत माGा म7 कोयले क(cid:11) आपूKत सुिनि?त करना Dचता का िवषय बना Iआ ह।ै िपछले दो वषV अथा(cid:14)त 2010-11 और 2011-12 के दौरान िव(cid:3)तु BेG को कोयला आपूKत क(cid:11) ि(cid:17)थित नीचे दी गई ह ै : ((((iiii)))) 2010-11 और 2011-12 क(cid:11) अविध के िलए कोयला आपूKत क(cid:11) ि(cid:17)थित वष(cid:14) 2010-11 और 2011-12 के िलए bोतवार कायU(cid:14) म और कोयले क(cid:11) &ािŠ संबंधी िववरण नीचे 9दए अनुसार ह - : अ&ैल, 2222000011110000---- ममममााााचचचच !! !!2222000011111111 अ&ैल 2222000011111111- माच(cid:14), 2222000011112222 &ािŠ म7 bोत काय(cid:14)Uम &ािŠ % काय(cid:14)Uम &ािŠ % वृिH (%) सीआईएल 335 302.8 90 347 310.4 90 2.9 एससीसीएल 30 33.6 112 32 35.4 110 5.4 कैिJटव 20 21.4 107 22 22.4 84 5.6 आयात 47 30.5 65 55 44.9 82 47.2 ई-नीलामी 6.2 जजजजोोोोड़ड़ड़ड़ 432 388.3 90 456 419.3 91 8.0216 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] ((((iiiiiiii)))) वष(cid:14) 2012-13 के दौरान कोयला मांग और उपल+ध ता क(cid:11) ि(cid:17)थित:::: वष(cid:14) 2012-13 के िलए लगभग 13,735 मेगावाट के कोयला आधाOरत Bमता अिभवृिH काय(cid:14)Uम क(cid:11) पOरक_प ना क(cid:11) गई ह।ै (cid:17)व दशे ी कोयला आधाOरत थम(cid:14)ल यूिनट; के िलए कोयले क(cid:11) आव"य कता क(cid:11) तुलना म7 (cid:17)व दशे ी bोत; स े कोयले क(cid:11) उपल+ध ता और आयात 9कए जाने वाले कोयले पर आधाOरत पावर Jल ांट; के िलए कोयले क(cid:11) आव"य कता संबंधी िववरण िव(cid:17)त ार से नीचे 9दए गए ह:- U.सं. िववरण 2012-13 1.1 (cid:17)व दशे ी कोयले पर िडजाइन 9कए गए पावर Jल ांट; के िलए कोयला 476 आव"य कता 1.2 आयाितत कोयले पर िडजाइन 9कए गए पावर Jल ांट; के िलए कोयला 24 आव"य कता 1.3 जजजजोोोोड़ड़ड़ड़ 500 2. (cid:17)व दशे ी bोत; से कोयले क(cid:11) उपल+ध ता 2.1 सीआईएल के bोत; स े 347 2.2 एससीसीएल के bोत; स े 35 2.3 कैिJटव खान; से 25 2.4 (cid:17)व दशे ी bोत; से कोयले क(cid:11) कुल उपल+ध ता 407 3. (cid:17)व दशे ी bोत; से कोयल े क(cid:11) कमी (1.1 – 2.4) 69 4.1 (cid:17)व दशे ी कोयले पर िडजाइन 9कए गए Jल ांट; के िलए कमी को पूरा करने के 44446666 िलए आयात 9कया जान े वाला कोयला 4.2 आयाितत कोयले पर िडजाइन 9कए गए Jल ांट; के िलए कोयला आव"य कता 22224444 उपयु(cid:14)*त से यह दखे ा जा सकता ह ै 9क (cid:17)व दशे ी कोयले क(cid:11) उपल+ध ता म7 69 िमिलयन टन क(cid:11) कमी ह।ै इस कमी को पूरा करन े के उZ"े य स े िव(cid:3)ुत कंपिनय; को 46 िमिलयन टन कोयला आयात करन े क(cid:11) आव"य कता ह।ै इसके अलावा 24 िमिलयन टन आयाितत कोयला क(cid:11) आव"य कता आयाितत कोयल े पर संचालन हते ु िडजाइन 9कए गए पावर (cid:17)ट ेशन; पर ह।ै (iii) 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा 11वP पंचवषhय योजना म 7 54,964 मेगावाट क(cid:11) Bमता अिभवृिH को Qय ान म 7 रखते Iए 12वP पंचवषhय योजना के दौरान Bमता अिभवृिH के 4 पOरद"ृ य , 18वP ईपीएस Oरपोट(cid:14) म7 9दए गए मांग पूवा(cid:14)नुमान; के आधार पर तैयार 9कए गए ह।- आधारभूत मामले के अनुसार 12वP योजना के दौरान Bमता अिभवृिH के िववरण िनXन ानुसार ह - :¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 217 &&&&ददददशशशश !! !! 11111111....1111 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन &&&&ककककााााररररववववाााारररर (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा अअअअििििभभभभववववििृृििृृ ???? ((((आआआआककंंककंं ड़ड़ड़ड़ ेे ेेममममेगेगेगेगााााववववााााटटटट मममम))66))66 + &कार 12वP योजना के दौरान Bमता (18वP ईपीएस मांग 5% एसआर के साथ) हाइ[ो 10,897 थम(cid:14)ल 70,903 कोयला िलrन ाइट 67,843 गैस 520 2,540 Tय िू *लयर 5,300 जोड़ 88887777,,,,111100000000 पवन 11,000 सौर 4,000 अअअअ====यय यय ननननववववीीीीककककररररणणणणीीीीयययय ऊऊऊऊजजजजाााा (cid:15)(cid:15) (cid:15)(cid:15)????ोोोोतततत 3,500 जजजजोोोोड़ड़ड़ड़ ((((ननननववववीीीीककककररररणणणणीीीीयययय ऊऊऊऊजजजजाााा !! !!;;;;ोोोोतततत)))) 18,500 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन ससससममममाााापपपपनननन 4,000 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन ककककोोोोययययललललाााा कककक++++ ममममाााागगंंगगंं औऔऔऔरररर उउउउपपपपललललXXXXधध धध तततताााा कोयला आधाOरत पावर (cid:17)ट ेशन; के िलए कोयला क(cid:11) उपल+ध ता गंभीर Dचता का िवषय ह।ै य(cid:3)िप अTय पारंपOरक और गैर पारंपOरक bोत; से िव(cid:3)तु उ(cid:29)प ादन अिधकतम करने के िलए जोर 9दया जा रहा ह,ै 9फर भी सरकार aारा यथापOरकि_पत लिBत जीडीपी को &ाJत करन े के िलए 12वP और 13वP पंचवषhय योजना के दौरान िव(cid:3)तु उ(cid:29)प ादन का मुjय आधार कोयला आधाOरत उ(cid:29)प ादन ही बन े रहन े क(cid:11) संभावना ह।ै कोयला आधाOरत Bमता अिभवृिH काय(cid:14)Uम अTय bोत; अथात(cid:14) हाइ[ो, Tय ूि*लयर, गैस, िलrन ाइट और नवीकरणीय bोत; स े िव(cid:3)ुत उ(cid:29)प ादन क(cid:11) उपल+ध ता को Qय ान म7 रखत े Iए तैयार 9कया गया ह।ै इस उ(cid:29)प ादन आव"य कता को पूरा करने के उZ"े य से कोयला आव"य कता (एसपीसीसी पर 0.72 9कलो कैलोरी &ित 9कलोNाम)। कोयला आव"य कता क(cid:11) गणना 842 िमिलयन टन क(cid:11) गई ह।ै 842 िमिलयन टन क(cid:11) कुल आव"य कता क(cid:11) तुलना म7 आयाितत कोयला आधार पर िडजाइन 9कए गए थम(cid:14)ल पावर (cid:17)ट ेशन; aारा 54 िमिलयन टन कोयला आयात 9कया जाना ह।ै एससीसीएल न े लगभग 35 कोयले क(cid:11) उपल+ध ता हते ु पुिn क(cid:11) ह ै और लगभग 100 िमिलयन टन कोयला कैिJटव कोयला +ल ॉक; से उपल+ध होने क(cid:11) संभावना ह।ै इस &कार f’pr 788 िमिलयन टन कोयले क(cid:11) उपल+ध ता सीआईएल aारा सुिन करने क(cid:11) आव"य कता ह,ै िजसक(cid:11) तुलना म 7 उTह ;ने 477 िमिलयन टन कोयले क(cid:11) आपूKत के िलए &ितबHता (cid:15)य *त क(cid:11) ह।ै अत: पावर (cid:17)ट ेशन; क(cid:11) आ"य कता को पूरा करने के िलए सीआईएल से अनुरोध 9कया जाए 9क वह अपना उ(cid:29)प ादन बढ़ाने के िलए आपातकालीन योजना तैयार करे। (cid:17)व दशे ी कोयले क(cid:11) उपल+ध ता/कमी के िववरण नीच े 9दए गए ह - : (i) वष(cid:14) 2016-17 के दौरान कोयला क(cid:11) आव"य कता = 842 िमिलयन टन¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 219 चूं9क पया(cid:14)वरण िwगेड से दबाव बढ़ रहा ह,ै अत: पयाव(cid:14) रण और वन मंGालय 1000 9कलोमीटर स े अिधक दरू ी पर अवि(cid:17)थत पावर Jल ांट; म7 34% धुले Iए कोयले के इ(cid:17)त ेमाल हते ु आव"य क मानदडं ; को घटाकर 500 9कलोमीटर क(cid:11) दरू ी पर अवि(cid:17)थत पावर Jल ांट; के िलए लागू करन े पर िवचार कर रहा ह।ै यह कोयला धुलाई BेG म7 िनजी (cid:15)य वसाियय; के िलए बIत सी संभावनाए ं पैदा करेगा। वत(cid:14)मान म7 भारत म7 1000 िमिलयन टन से अिधक कोqकग कोल को धोने क(cid:11) Bमता मौजूद ह।ै सीआईएल कोल वाशरीज के िवकास म7 अNणी भूिमका अदा करता रहा है, परंतु जनशि| क(cid:11) सम(cid:17)य ा6 के साथ साथ &चालन लागत अिधक होन े के कारण सीआईएल ने कोल वाशरीज के &चालन हते ु बीओएम (िब_ड , ऑपरेट और मेनटेन) आधार पर िनजी कंपिनय; क(cid:11) सेवाए ं लेन े का िन"च य 9कया ह।ै इसम7 भारत के िविभTन भूभाग; म 7 22 कोल वाशरीज के िवकास हते ु अंतरा(cid:14)RS ीय बोली &9Uया के िलए योजना बनाई ह।ै &थम चरण (11 कोल वाशरीज) म7 कोल वाशरीज के िवकास हते ु &ितयोगी बोली &9Uया के तहत 66 कंपिनय; ने tिच दशा(cid:14)ई ह।ै इसने 4 वष(cid:14) क(cid:11) समयाविध म7 अपनी मौजूदा Bमता 120 एमटीपीए को 250 एमटीपीए तक बढ़ाने के िलए कोल वाशरीज के िवकास हते ु 5,000 करोड़ tपए क(cid:11) भारी रािश िनधा(cid:14)Oरत क(cid:11) ह।ै घघघघररररेेेेलललल ूू ूूककककोोोोययययललललाााा उउउउ####पप पप ााााददददनननन ककककेेेे ससससधधधधुुुु ाााारररर हहहहततेेततेे ुु ुुररररणणणणननननीीीीििििततततययययाााा ंं ंं (cid:2) ककककोोोोययययललललाााा खखखखाााानननन**** कककक++++ दददद(cid:26)(cid:26)(cid:26)(cid:26)तततताााा औऔऔऔरररर उउउउ####पप पप ााााददददककककतततताााा बबबबढ़ढ़ढ़ढ़ाााानननन ेेेे ककककेेेे ििििललललएएएए आआआआधधधधििुुििुु ननननकककक ((((''''टट टट ेेेेटटटट ऑऑऑऑफफफफ ((((दददद आआआआटटटट!! !! &&&&ौौौौ(cid:25)(cid:25)(cid:25)(cid:25)ोोोोििििगगगगकककक++++ ककककाााा &&&&ययययोोोोगगगग औऔऔऔरररर ससससबबंंबबंं ििंंििंं धधधधतततत ननननीीीीििििततततगगगगतततत पपपपIIIIररररववववततततनन!!नन!! :::: (cid:17)ट ेट ऑफ 9द आट(cid:14) अंतरा(cid:14)RS ीय कोयला खनन &ौ(cid:3)ोिगक(cid:11), उ5च आउटपुट – उ5च दBता एचईएमएम, खान सुरBा के िलए नई &ौ(cid:3)ोिगक(cid:11) आ9द को अपनाने क(cid:11) &9Uया को सकु र बनाने के िलए भारत सरकार aारा आयात नीितय; को और अिधक उदार बनाए जाने क(cid:11) आव"य कता ह।ै इसके अलावा कोयला BेG को भी ‘करावकाश और शु_क ’ आ9द म7 छूट के साथ ''अवसंरचना BेG का दजा (cid:14) 9दया जाए। वैकि_पक 4प स े 5 एमटीपीए या उससे अिधक उ(cid:29)प ादन (cid:17)त र वाली कोयला खान; को मेगा दजा(cid:14) दते े Iए कोयला BेG म7 भी मेगा पOरयोजना संक_प ना को लागू 9कया जाए और कर/शु_क म7 छूट का लाभ &दान 9कया जाए। (cid:2) ककककोोोोययययललललाााा खखखखनननननननन उउउउ(cid:25)(cid:25)(cid:25)(cid:25)ोोोोगगगग ककककेेेे ििििललललएएएए आआआआरररर एएएएUUUUडड डड आआआआरररर ननननीीीीिििितततत पOरयोजना &भािवत लोग; क(cid:11) आजीिवका क(cid:11) रBा के िलए आर एsड आर नीित तयै ार क(cid:11) जाए। (cid:17)प Rट ता और एक4पता लाने के िलए राRS ीय (cid:17)त र पर एक समान आर एsड आर नीित तैयार क(cid:11) जानी चािहए और उसे भारत म7 कोयला उ(cid:29)प ादन करने वाली सभी कंपिनय; aारा अपनाया जाना चािहए। आधुिनक &ौ(cid:3)ोिगक(cid:11) के बढ़ रह े &योग और आधुिनक(cid:11)करण, कोयला खनन &चालन म 7 अिधक (cid:17)व चालन और कंJय ूटर िनयंGण, नई खान; म7 कम जनशि| िनयोजन क(cid:11) आव"य कता से रोजगार के अवसर कम ह;गे। अत: कोयला खनन BेG के िलए राRS ीय आर एsड आर नीित तैयार करत े समय इस पहलू को Qय ान म7 रखा जाए और िव(cid:17)थ ािपत लोग; के जीवकोपाज(cid:14)न, उTन ित और लाभ के िलए उपयु*त िवक_प ; पर सहमित (cid:15)य *त क(cid:11) जाए। इसके अलावा भूमा9फय; aारा भूिम क(cid:11) BितपूKत लागत अ_प ाविध म7 कम करने जैसी सम(cid:17)य ा6 स े बचने के उZ"े य से भूिम क(cid:11) BितपूKत रािश को +य ाज सिहत जमा रािशय; – खान मािलक aारा सृिजत उपयु*त िनिध म7 आंिशक 4प से अथवा संपूण(cid:14) रािश जमा रखने, बॉsड आ9द जारी करने जैसी उपयु*त (cid:15)य व(cid:17)थ ा6 क(cid:11) संभावना तलाश क(cid:11) जाए। अTय उ(cid:3)ोग; स े अलग कोयला खनन उ(cid:3)ोग के िलए सपं ूण(cid:14) अिधगृहीत भूिम पर (cid:17)थ ायी 9फ*च स (cid:14) क(cid:11) (cid:17)थ ापना क(cid:11) आव"य क नहP होती, अत: खनन के प"च ात कुछ भिू म का &योग िम‹ी भराई और खाद आ9द डालकर उिचत िवकास करने के प"च ात कृिष काय(cid:14) हते ु 9कया सकता ह।ै कोयला खनन के िलए आर एsड आर नीित म 7220 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] एक िनधा(cid:14)Oरत अविध के िलए (cid:17)थ ानीय लोग; से भूिम को प‹े पर लेना और खनन का काय(cid:14) पूण(cid:14) होने पर उसका उिचत िवकास कर यथासंभव संबंिधत लोग; को भूिम लौटाने जैस े अTय पहलु6 पर िवचार पर िवचार 9कया f’pr जाए ता9क उस भूिम पर पुन: कृिष काय(cid:14) 9कया जा सके। िन Jल ॉट म7 खनन काय (cid:14) करने वाली एज7सी/संगठन भूिम का उिचत िवकास करने और संबंिधत लोग; को भूिम लौटान े के िलए जवाबदहे होगा। (cid:2) ककककोोोोययययललललाााा खखखखनननननननन पपपपIIIIररररययययोोोोजजजजननननाााा.... ककककेेेे ििििववववककककाााासससस हहहहततततेेेे ुु ुु####वव वव IIIIररररतततत ''''वव वव ीीीीककककृृृृििििततततययययाााा ंं ंं: कोयला खनन पOरयोजना6 के तेजी से 9UयाTव यन के िलए पया(cid:14)वरणीय (cid:17)व ीकृित सिहत िविभTन (cid:17)व ीकृितया ं और अनुमित &ाJत करने के िलए सरलीकृत &9Uया6 और एकल िखड़क(cid:11) पहल, िनवेश संबंधी िनण(cid:14)य शीu लेने, केTe और रा/य सरकार क(cid:11) एज7िसय; आ9द के बीच बेहतर समTव य के संदभ(cid:14) म7 सरकार क(cid:11) सहायता आव"य क होगी। (cid:2) ककककैैैैििििQQQQटटटटवववव ककककोोोोययययललललाााा खखखखनननननननन कोयला उ(cid:29)प ादन, आधुिनक(cid:11)करण और दBता सुधार इस उ(cid:3)ोग म7 &ित(cid:17)प धा(cid:14) के (cid:17)त र पर िनभ(cid:14)र करेगा। कोयला खनन के BेG म7 आव"य क िनवेश जुटान े के िलए साव(cid:14)जिनक और िनजी दोन; BेG; क(cid:11) कई कंपिनय; का &वेश आव"य क ह।ै कोयला BेG म7 नई कंपिनय; का पदाप(cid:14)ण इस BेG के िलए संपूण(cid:14) 4प से लाभदायक होगा। इसीिलए इसे आव"य क समझा जाता ह।ै यह दशे के कुल उ(cid:29)प ादन के 40-50% तक कैिJटव खनन के जOरए धीरे धीरे उ(cid:29)प ादन बढ़ाने के िलए भी आव"य क होगा। कोयला खान; के िवकास और &चालन हते ु अंतरा(cid:14)RS ीय (cid:17)त र पर &ितिŒत कोयला खनन कंपिनय; को भी भारत आने के िलए &ो(cid:29)स ािहत 9कया जाए। इससे नवीनतम खनन &ौ(cid:3)ोिगक(cid:11) और खान सुरBा उपाय; को लागू करने म7 सहायता िमलेगी। (cid:2) ररररााााBBBBयय यय ससससररररककककाााारररर**** ककककोोोो ककककोोोोययययललललाााा ककककेेेे ििििववववककककाााासससस मममम 66 66 भभभभाााागगगगीीीीददददाााारररर बबबबननननााााययययाााा जजजजााााननननाााा चचचचााााििििहहहहएएएए I खनन &चालन से रा/य ; को &ो(cid:29)स ािहत करने क(cid:11) आव"य कता ह।ै ii +ल ॉक; के आवंटन से पहले सबं ंिधत रा/य सरकार से परामश(cid:14) 9कया जाए और उसे इस &9Uया म7 एक पBकार बनाया जाए *य ;9क उनके रा/य ; म 7 कोयला खनन का &(cid:29)य B अथवा अ&त् यB लाभ िवशेष 4प से उस रा/य को ही िमलेगा। iii खिनज संपTन रा/य ; म7 भूिम अिधNहण, पया(cid:14)वरणीय और वन (cid:17)व ीकृित स े संबंिधत &(cid:17)त ाव; पर आव"य क कार(cid:14)वाई के िलए एक अलग &कोRठ (एमओयू के जOरए एकल िखड़क(cid:11) पहल) का गठन 9कया जाए। iv कोयला संपTन रा/य ; को रॉय_ट ी के अलावा समयबH ढंग से खनन शु4 करने म7 उनके सह-&चालन के िलए उTह 7 &ो(cid:29)स ािहत 9कया जाए। (cid:2) पपपपIIIIररररययययोोोोजजजजननननाााा ककककााााययययााााCC!!CC!! वव वव ययययनननन कककक++++ &&&&गगगगिििितततत कककक++++ ििििननननगगगगररररााााननननीीीी ककककेेेे ििििललललएएएए ििििववववशशशशषषेेषषेे ककककााााययययबब!!बब!! लललल कोयला खनन पOरयोजना6 क(cid:11) &गित क(cid:11) आविधक 4प से समीBा और िनगरानी के िलए एक िवशेष f’pr काय(cid:14)बल गOठत 9कया जाए। यह समय पर कोयला उ(cid:29)प ादन सुिन करने के िलए आव"य क (cid:17)व ीकृितयां/अनुमोदन &ाJत करन े और िनधा(cid:14)Oरत समयाविध म7 पOरयोजना को पूण(cid:14) करने म7 सहायता करेगा। यह िनगरानी और ि(cid:17)थित के Oरपो(cid:141)टग पारदशh ढंग से इले*S ॉिनक 4प म7 क(cid:11) जानी चािहए। (cid:2) ककककोोोोययययललललाााा खखखखाााानननन**** कककक++++ पपपपययययााााQQ!!QQ!! तत तत ससससभभभभंंंं ााााववववननननााााएएएए ंं ंं औऔऔऔरररर ििििननननककककाााालललल ेेेे जजजजाााानननन ेेेे ववववाााालललल ेे ेे आआआआररररिििि(cid:26)(cid:26)(cid:26)(cid:26)तततत भभभभडडंंडडंं ाााारररर ककककेेेे अअअअननननमममुुमुु ाााानननन**** कककक++++ ििििवववव----वव वव ससससननननीीीीययययतततताााा ffff’’’’pppprrrr ससससििुुििुु नननन ककककररररननननाााा यह (cid:15)य ापक कोयला संसाधन मू_य ांकन कार(cid:14)वाई पूण(cid:14) करन े के िलए BेGीय सवlBण और ि[Dलग क(cid:11) गित बढ़ाने के िलए हमारे &यास; को तेज करन े के उZ"े य स े आव"य क ह।ै अत: कोयला +ल ाक; का पता लगान े और¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 221 जीआर तैयार करने के िलए अिधक संjय ा म7 िवशेष‡ एज7िसय; का पैनल तैयार करने क(cid:11) आव"य कता ह ै ता9क कोयला +ल ाक; से समयबH ढंग से कोयले का उ(cid:29)प ादन श4ु 9कया जा सके। (cid:2) ििििननननजजजजीीीी (cid:26)(cid:26)(cid:26)(cid:26)(cid:27)(cid:27)ेे(cid:27)(cid:27)ेे llllाााारररराााा ववववााााििििणणणणििििBBBBययययकककक ककककोोोोययययललललाााा खखखखनननननननन कोयला खनन के BेG म7 पया(cid:14)Jत िनवेश करने, कोयला के आरिBत भंडार; का सरं Bण, खान सरु Bा और f’pr f’pr पया(cid:14)वरण संरBण सुिन करन े और (cid:17)थ ानीय <िमक; के िलए बेहतर जीवन (cid:17)त र सुिन करने क(cid:11) आव"य कता 1971 और 1973 के दौरान कोयला खान; के राRS ीयकरण का आधारभतू कारण थी। इस संदभ(cid:14) म 7 कोयला खान; (राRS ीयकरण) संशोधन िवधेयक 2000 कोयला BेG म7 उदारीकरण को बढ़ावा दने े क(cid:11) 9दशा म7 उठाया गया एक बड़ा कदम ह।ै इससे कोयला खनन BेG म7 िनजी कंपिनय; क(cid:11) (cid:15)य ापक भागीदारी के जOरए दशे म7 कोयला उ(cid:29)प ादन के िव(cid:17)त ार क(cid:11) आव"य कता भी पूरी होगी। लंबे समय से लिं बत &(cid:17)त ािवत संशोधन िवधेयक को अंितम 4प दने े के िलए शीu कार(cid:14)वाई क(cid:11) जाए। ककककोोोोययययललललाााा ममममYYूूYYूू यय यय कककक++++ पपपपaaूूaaूू ललललगगगग :::: घरेलू और आयाितत कोयले के मू_य क(cid:11) पूDलग िवषयक संक_प ना इस तFय के आलोक म7 आव"य क ह ै 9क मौजूदा के साथ साथ घरेलू कोयले पर आधाOरत &(cid:17)त ािवत पावर (cid:17)ट ेशन;, के िलए कोयले क(cid:11) आव"य कता के <+ अनु4प घरेलू कोयले का उ(cid:29)प ादन नहP ब पा रहा ह।ै /य ादातर नई िव(cid:3)ुत कंपिनय; को घरेलू कोयले क(cid:11) आ"य कता और उपल+ध ता के बीच अंतर को दरू करन े के िलए कोयला आयात करने क(cid:11) आव"य कता होगी। थम(cid:14)ल पावर Jल ांट; के िलए कोयले का आयात मुjय 4प से आ(cid:17)S ेिलया और इंडोनेिशया जैसे दशे ; से 9कया जा रहा ह,ै िजनके कोयले का कैलोOर9फक मू_य बIत अिधक अथा(cid:14)त 6000 से 6500 9कलो सेि_सयस/9कलोNाम ह ै और उसम7 ऐश क(cid:11) माGा बIत कम ह।ै कोयले के आयात के िलए &मुख बंदरगाह मुंeा, िवजाग, गंगावरम, एTन ोर, तूतीकोरीन और िपपावव आ9द ह।- इन बंदरगाह; स े पावर Jल ांट (cid:17)थ ल, जो तटवतh BेG; म7 नहP ह - अथवा उन रा/य ; म7 ह - जहां य े बंदरगाह अवि(cid:17)थत नहP ह,- तक पOरवहन क(cid:11) लागत 15,00 tपए &ित टन हो सकती ह।ै दशे म7 िव(cid:3)ुत कंपिनय; के िलए कोयले का पOरवहन मुjय 4प से भारतीय रेलवे aारा 9कया जा रहा ह ै और उसके /य ादातर रेल मागV पर पहले से ही यातायात का भारी दबाव ह।ै इन बंदगाह; से मQय भारत म 7 अवि(cid:17)थत िव(cid:3)ुत कंपिनय; तक कोयले के पOरवहन और तटवतh अथवा आसपास के BेG; म7 अवि(cid:17)थत िव(cid:3)तु कंपिनय; से घरेलू कोयला खान; तक रेल आवागमन क(cid:11) सुिवधा मौजूद ह।ै इसके कारण कोयला रैक; का दोहरा M+s <+ आवागमन होता ह ै और माल भा पर अनाव"य क (cid:15)य य ब रहा ह ै तथा भारतीय रेलवे के नेटवक(cid:14) पर अनाव"य क ओवरलोDडग और संभारतंG से जुड़ी अTय सम(cid:17)य ाए ं पैदा होती ह।- इतनी लंबी दरू ी से कोयले के पOरवहन म 7 पारगमन हािन भी बढ़ जाती ह ै जो उ(cid:29)प ादन यूिनट; क(cid:11) बॉटम लाइन म7 &दKशत होती ह।ै चूं9क dधन क(cid:11) क(cid:11)मत M+k f’pr सामाTय त: टैOरफ म7 जोड़ दी जाती ह ै अत: अिधक माल भा &भार से िन 4प से टैOरफ बढ़ जाएगा और उपभो*त ा6 को बढ़ी Iई लागत पर िव(cid:3)ुत आपूKत क(cid:11) जाएगी। इस &कार इस ि(cid:17)थित को यथासंभव औिच(cid:29)य पूण (cid:14) बनाने क(cid:11) आव"य कता ह।ै इस सम(cid:17)य ा का समाधान यह ह ै 9क िव(cid:3)ुत कंपिनय; को ऐस े कोयला +ल ॉक; स े कोयला आवंटन 9कया जाए जो उनके आसपास अवि(cid:17)थत ह।- इससे पOरवहन क(cid:11) लागत को कम 9कया जा सकता ह।ै तटवतh BेG; म7 अवि(cid:17)थत िव(cid:3)ुत कंपिनय; से कहा जाए 9क व े िडजाइन सीमा6 के अQय धीन बंदरगाह के समीप होने के नात े अिधकांशत: आयाितत कोयले का इ(cid:17)त ेमाल कर7। कोल इंिडया िल. क(cid:11) /य ादातर खान7 मQय भारत म7 अवि(cid:17)थत ह - और अिधकांश पावर (cid:17)ट ेशन; स े कोयला खान; तक पOरवहन के िलए लगभग उतनी ही दरू ी तय करनी पड़ती ह।ै अत: ऐसी िव(cid:3)ुत कंपिनयां जो बंदरगाह; से अिधक दरू ी पर ि(cid:17)थत ह-, को कोल इंिडया िलिमटेड क(cid:11) खान; से ही कोयला आवंOटत 9कया जाए और उनसे कहा जाए 9क आयाितत कोयले का &योग केवल कमी के मामले म7 ही 9कया जाए ता9क कोयला रैक; के अनाव"य क दोहरे सचं लन से बचा जा सके।222 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] यह एक (cid:17)व ीकाय(cid:14) तFय ह ै 9क आयाितत कोयले का मू_य उ5च तर जीसीबी क(cid:11) गणना के बावजूद भी घरेलू कोयल े क(cid:11) तुलना म7 अिधक ह,ै वतम(cid:14) ान म7 यह ऊRम ा मू_य आधार पर घरेल ू कोयले क(cid:11) तलु ना म7 कम स े कम ढाई गुना अिधक ह।ै यह तटवतh BेG; म7 अवि(cid:17)थत िव(cid:3)ुत कंपिनय; के िलए बाधा सािबत हो सकती ह।ै य9द उनस े अिधक <+ माGा म7 आयाितत कोयले का इ(cid:17)त ेमाल करन े के िलए कहा जाता ह ै तो उनक(cid:11) उ(cid:29)प ादन लागत ब जाएगी। अत: एक ऐसा मामला भी सामने आता ह ै 9क घरेलू कोयले क(cid:11) मांग और उपल+ध ता के बीच अंतर को दरू करने के िलए कोयला आयात 9कया जाए और आयात पर होने वाल े (cid:15)य य को सभी िव(cid:3)तु कंपिनय; aारा बराबर 4प म7 वहन 9कया जाए। तथािप यह उ_ल ेख 9कया जाए 9क लागत पूDलग क(cid:11) संक_प ना केवल घरेलू कोयले के िलए िडजाइन 9कए गए पावर (cid:17)ट ेशन; के िलए ही लागू होगी अथवा अTय सभी के िलए भी। इस पूDलग (cid:15)य व(cid:17)थ ा म7 आयाितत कोयले पर आधाOरत पावर (cid:17)ट ेशन और ऐसे पावर (cid:17)ट ेशन िजनके िलए समKपत कोयला +ल ाक आवंOटत 9कए गए ह,- को शािमल करने पर िवचार नहP 9कया जाएगा। िनXन िलिखत <ेिणय; के पावर Jल ांट; के आयाितत कोयल े के सदपु योग (मौजूदा (cid:17)ट ेशन; के िलए आयाितत कोयले के साथ 15% िम<ण और नए (cid:17)ट ेशन; के िलए 30% िम<ण क(cid:11) शत(cid:14) के अQय धीन) हते ु लागत पूDलग संक_प ना के अंतग(cid:14)त उ5च &ाथिमकता दी जाए: • तटवतh िव(cid:3)तु (cid:17)ट ेशन • M+h ऐसे (cid:17)ट ेशन जहां (cid:17)व दशे ी कोयले क(cid:11) उपल+ध ता एक ब बाधा ह।ै • ऐसे (cid:17)ट ेशन जो िपट हडे से बIत अिधक दरू अवि(cid:17)थत ह।- • ऐसे (cid:17)ट ेशन िजTह 7 ऐसी माGा से संबंिधत पया(cid:14)वरण और वन मंGालय के अनुदशे ; का अनुपालन सुिनि?त करना अिनवाय(cid:14) ह।ै यथासंभव पावर (cid:17)ट ेशन; म7 मौजूदा कोल हड- Dलग सुिवधा6 के िलए उपयु(cid:14)*त पर &ाथिमकता के आधार पर िवचार 9कया जाए। पूDलग मू_य का मू_य ांकन कोयले के ऊRम ा मू_य (t./9कलो कैलोरी) के आधार पर 9कया जाए। सीआईएल आयाितत कोयल े के िलए तथा िविभTन िव(cid:3)ुत कंपिनय; स े पूंDलग मू_य क(cid:11) वसूली के िलए िजXम ेदार होगा। यह इस तFय के आलोक म7 उिचत ह ै 9क नई कोयला िवतरण नीित म7 यह उ_ल ेख 9कया गया ह ै 9क सीआईएल िव(cid:3)तु कंपिनय; को कोयले क(cid:11) सामाTय आव"य कता का 100% उपल+ध कराने के िलए िजXम ेदार ह ै और आव"य क सीमा तक कोयले का आयात बहाल 9कया जाए। ककककोोोोययययलललल ेे ेेकककक++++ ईईईई----ननननीीीीललललााााममममीीीी एनसीडीपी के अनसु ार सीआईएल aारा कुल उ(cid:29)प ादन के कम से कम 10% भाग के िलए ई-नीलामी क(cid:11) (cid:15)य व(cid:17)थ ा क(cid:11) जाए। यह सुिनि?त 9कया जाए 9क 10% माGा का &(cid:17)त ाव दने े से पहले एफएसए/एमओयू क(cid:11) &ितबHता6 को पूरा 9कया जाए। ऐसी खदान; जहां से कोयल े के िलए ई-नीलामी क(cid:11) जानी ह,ै से रेल संपक(cid:14) के मुZ े को त(cid:29)क ाल उठाया जाना चािहए। ककककोोोोययययललललाााा ििििननननययययााााममममकककक fDoM कोयले के अप(cid:17)S ीम आवंटन और उपल+ध कोयला +ल ॉक; का पता लगाने, कोल बेड मीथेन, कोल-टू-िल और (cid:17)व (cid:17)थ ाने कोल गैसी9फकेशन के िविनयमन हते ु एक (cid:17)व तंG िनयामक िनकाय गOठत करने के िलए लंबे समय से आव"य कता महससू क(cid:11) जा रही ह।ै एक अंतOरम उपाय के 4प म 7 &(cid:17)त ािवत िनयामक िनकाय कोयला मू_य संशोधन, अनुमो9दत कर सकता ह,ै वािणि/यक 4प से चािलत दीघ(cid:14)कालीन एफएसए के अंतग(cid:14)त िव(cid:3)ुत BेG को कोयले क(cid:11) आपूKत सुिनि?त कर सकता ह।ै दीघ(cid:14)कालीन dधन आपूKत करार; के अंतग(cid:14)त कोयला मू_य ; के पुनKनधा(cid:14)रण हते ु सूG/सचू काकं ; के िवकास म 7 सहयोग कर सकता ह,ै &(cid:17)त ािवत ई-नीलामी क(cid:11) कार(cid:14)वाई क(cid:11)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 223 िनगरानी कर सकता ह ै और यह सुिनि?त कर सकता ह ै 9क ई-नीलमी के जOरए िनधाO(cid:14) रत 9कए जान े वाल े म_ू य ; म7 9कसी तरह क(cid:11) GुOट न हो, (cid:15)य ापाOरक लाभ (माKजन) का िविनयमन, मांग और आपूKत के बीच अंतर को दरू करने के िलए दीघ(cid:14)कालीन सिं वदा6 के अंतग(cid:14)त आयाितत कोयले क(cid:11) पया(cid:14)Jत माGा सुिनि?त करने के िलए तंG िवकिसत करना, इस &कार यह सुिनि?त करना 9क ई-नीलामी और उसके प"च ात ् मू_य िनधा र(cid:14) ण आपूKत क(cid:11) दिृ n से बाधक बाजार म7 नहP 9कया गया ह।ै अंितम 4प से यह िनयामक &ित(cid:17)प धh कोयला बाजार के िलए अनकु ूल वातावरण िनKमत करेगा। &ितयोगी बाजार िवकिसत हो जाने पर क(cid:11)मत िनधा(cid:14)रण म7 िनयामक क(cid:11) भूिमका यह सुिनि?त करनी होगी 9क कोयले का मु*त और पारदशh िववरण सुिनि?त 9कया जाए। िनयामक को यह सुिनि?त करना चािहए 9क खान; क(cid:11) आयोजना, िडजाइन और िवकास वै‡ािनक ढंग से 9कया जाए िजसम7 कोयला सरं Bण को अपेिBत मह(cid:29)व दते े Iए भूगभhय +ल ॉक; से कोयले क(cid:11) अिधकतम िनकासी सुिनि?त क(cid:11) जाए। िनयामक को &चालन के मानदडं ; का मानक(cid:11)करण करना चािहए, ब7चमाक(cid:14) (cid:17)थ ािपत करना चािहए और यह सुिनि?त करना चािहए 9क कोयला कंपिनयां अपने दBता (cid:17)त र; को अंतरा(cid:14)RS ीय मानक; के अन4ु प बनान े के िलए &यास कर7। &(cid:17)त ािवत कोयला िनयामक को कोयला खनन के िनXन िलिखत पहलू भी सkपे जाने चािहए: • कोयला संसाधन &बंधन। • कोयला खान; म7 सरं Bा, (cid:17)व ा(cid:17)F य और रोजगार, • मू_य , कर, रॉय_ट ी, मू_य वKधत कर, संपिŽ कर और कामगार; का वेतन, • पया(cid:14)वरण &बंधन • नीितगत-कानूनी, जनसंपक(cid:14), सांिjयक(cid:11)य और िववाद समाधान • एलओए जारी करने के िलए सीआईएल को िसफाOरश7 • खान; को बंद करने क(cid:11) योजना6 सिहत खान योजना6 का अनुमोदन • M+ रेल/स क पOरवहन को Tय ूनतम करने के िलए वत(cid:14)मान सपं कV का इRट तमीकरण • कैिJटव कोयला +ल ाक; क(cid:11) नीलामी पर पय(cid:14)वेBक क(cid:11) भूिमका • िववाद समाधान के िलए &ाथिमक फोरम : (cid:1) संगठन; के बीच िववाद समाधान; (cid:1) खान बंद करन े आ9द के संबंध म7 कोयला मंGालय/पया(cid:14)वरण एवं वन मंGालय aारा 9दए गए आदशे ; के कारण (cid:15)य िथत संगठन; के िववाद समाधान आ9द। 11111111....3333 ििििलललल1111नन नन ााााइइइइटटटट ऐसा अनुमान ह ै 9क दशे म7 िलrन ाइट का आरिBत भंडार 40.9 िबिलयन टन ह,ै िजसम7 अिधकांश तिमलनाडु रा/य म7 पाया जाता ह।ै लगभग 82% िलrन ाइट के आरिBत भंडार तिमलनाडु और पािsडचेरी म7 अव ि(cid:17)थत ह।- वत(cid:14)मान म7 कुल आरिBत भंडार के कुछ &ितशत भाग का ही दोहन 9कया गया ह।ै िलrन ाइट के आरिBत भंडार; के दोहन क(cid:11) काफ(cid:11) संभावनाए ं बनी Iई ह - और तिमलनाडु, राज(cid:17)थ ान, गुजरात जसै े रा/य ; के थम(cid:14)ल पावर (cid:17)ट ेशन; म7 िलrन ाइट का &योग लागत क(cid:11) दिृ n से िमत(cid:15)य यी हो सकता ह ै *य ;9क इन BेG; म7 कोयले के पOरवहन क(cid:11) अपनी सीमाए ं ह।- िलrन ाइट संसाधन; का रा/य वार िवतरण, िलrन ाइट क(cid:11) मांग और मैसस(cid:14) िलrन ाइट कॉपyरेशन िलिमटेड (एनसीएल) aारा तैयार क(cid:11) गई उ(cid:29)प ादन योजना तथा रा/य िव(cid:3)ुत बोड (cid:14) aारा िलrन ाइट क(cid:11) मांग और उ(cid:29)प ादन योजना तािलका 11.2 से 13.2 म7 दशा(cid:14)यी गई ह:ै224 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] ततततााााििििललललककककाााा 11111111....1111 रररराााा(cid:29)(cid:29)(cid:29)(cid:29)यय यय ववववाााारररर ििििलललल(cid:30)(cid:30)(cid:30)(cid:30)नन नन ााााइइइइटटटट ककककेेेे आआआआररररिििि""""तततत भभभभडडंंडडंं ाााारररर रररराााा(cid:3)(cid:3)(cid:3)(cid:3)यय यय जजजजोोोोMMMM + [ििििममममििििललललययययनननन टटटटनननन] तिमलनाडु 33309.53 राज(cid:4) थान 4835.29 गुजरात 2722.05 ज(cid:7) मू एवं क(cid:14) मीर 27.55 अ(cid:17) य (केरल, पि(cid:21)म बंगाल) 11.44 जोMMMM++ ++ 40905.86 ततततााााििििललललककककाााा 11111111....2222 ममममससैैससैै सससस !! !!ििििननननववववललेेललेे ीीीी ििििलललल1111नन नन ााााइइइइटटटट ककककॉॉॉॉपपपप````ररररेेेेशशशशनननन ििििललललििििममममटटटटेेडडेेडड llllाााारररराााा ििििलललल1111नन नन ााााइइइइटटटट कककक++++ ममममाााागगंंगगंं औऔऔऔरररर उउउउ####पप पप ााााददददनननन ययययोोोोजजजजननननाााा ममममदददद 2222000011112222----11113333 2222000011113333----11114444 2222000011114444----11115555 2222000011115555----11116666 2222000011116666----11117777 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ममममाााागगंंगगंं ((((ििििममममििििललललययययनननन टटटटनननन)))) 25.60 26.12 25.91 25.37 27.26 111133330000....22227777 उउउउ(cid:12)(cid:12)(cid:12)(cid:12)पप पप ााााददददनननन ((((ििििममममििििललललययययनननन टटटटनननन)))) 26.01 26.01 26.01 26.01 27.29 111133331111....33333333 ममममाााागगंंगगंं उउउउ(cid:12)(cid:12)(cid:12)(cid:12)पप पप ााााददददनननन अअअअततंंततंं रररराााालललल 0000....44441111 ----0000....11111111 0000....11110000 0000....66664444 0000....00002222 1111....00005555 ((((ििििममममििििललललययययनननन टटटटनननन)))) 12वP पंचवषhय योजना अविध के दौरान अTय रा/य िव(cid:3)ुत बोडV और िनजी कंपिनय; (एनएलसी से इतर) aारा िलrन ाइट क(cid:11) संभािवत मांग और उ(cid:29)प ादन योजना के वष(cid:14)वार िववरण तािलका 11.3 म7 दशा(cid:14)ए गए ह - : ततततााााििििललललककककाााा 11111111....3333 ररररााााBBBBयय यय ििििवववव(cid:25)(cid:25)(cid:25)(cid:25)ततुुततुु बबबबोोोोडडडडpppp llllाााारररराााा ििििलललल1111नननन ााााइइइइटटटट कककक++++ ममममाााागगंंगगंं औऔऔऔरररर उउउउ####पप पप ााााददददनननन ययययोोोोजजजजननननाााा ममममदददद 2222000011112222----11113333 2222000011113333----11114444 2222000011114444----11115555 2222000011115555----11116666 2222000011116666----11117777 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ररररााााजजजज''''थथ थथ ाााानननन ररररााााBBBBयय यय ििििवववव(cid:25)(cid:25)(cid:25)(cid:25)ततुुततुु उउउउ####पप पप ााााददददनननन ििििननननगगगगमममम ििििललललििििममममटटटटेेेेडडडड ममममाााांगंगंगंग ((((ििििममममििििललललययययनननन टटटटनननन)))) 8.4 8.4 10.5 10.7 10.7 44448888....7777 उउउउ####पप पप ााााददददनननन ((((ििििममममििििललललययययनननन टटटटनननन)))) 5.4 6.1 10.6 13.1 13.1 44448888....3333 ममममाााांगंगंगंग –––– उउउउ####पप पप ााााददददनननन -3 -2.3 0.1 2.4 2.4 ----0000....4444 अअअअततंंततंं रररराााालललल ((((ििििममममििििललललययययनननन टटटटनननन)))) गगगगजजुुजजुु रररराााातततत इइइइंंंंडडडड''''LL LL ीीीीजजजज पपपपााााववववरररर ककककंंंंपपपपननननीीीी ििििललललििििममममटटटटेेडडेेडड ममममाााांगंगंगंग ((((ििििममममििििललललययययनननन टटटटनननन)))) 3.6 3.6 3.6 8.1 8.1 22227777....0000 उउउउ####पप पप ााााददददनननन ((((ििििममममििििललललययययनननन टटटटनननन)))) 3.6 4.2 5 8.4 8.4 22229999....6666 ममममाााांगंगंगंग –––– उउउउ####पप पप ााााददददनननन 0000 0000....6666 1111....4444 0000....3333 0000....3333 1111....4444 अअअअततंंततंं रररराााालललल ((((ििििममममििििललललययययनननन टटटटनननन))))¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 225 (cid:1) Ms+ दशे म7 िलrन ाइट के ब आरिBत भंडार को Qय ान म7 रखते Iए िलrन ाइट उ(cid:29)प ादन के िव(cid:17)त ार हते ु त(cid:29)क ाल कदम उठाए जाने क(cid:11) आव" यकता ह।ै िलrन ाइट संसाधन; के दB सदपुयोग के िलए &ौ(cid:3)ोिगक(cid:11)य संबंधी मुZ; का समाधान 9कया जाना चािहए। 11111111....4444 &&&&ााााककककृृृृििििततततकककक गगगगससैैससैै ((((iiii)))) केवल एक काब(cid:14)न और चार हाइ[ोजन एटम पर &ित मॉिल*य ूल क(cid:11) दर से &ाकृितक गैस म7 सबसे कम काब(cid:14)न हाइ[ोजन अनुपात होता ह,ै अत: यह पूरी तरह से जल जाती ह ै और इसीिलए यह सभी अपिशR ट dधन; म7 सबस े (cid:17)व 5छ dधन ह।ै &ाकृितक गसै आधुिनक औ(cid:3)ोिगक समाज म7 dधन क(cid:11) /य ादातर आव"य कता6 को पूरा करती ह;ै दB होने के साथ-साथ यह &दषू ण रिहत और तुलना(cid:29)म क 4प से 9कफायती भी ह।ै तेल के मू_य और आपूKत दोन; <+k म7 आविधक अिनि?तता और उतार च व भी &ाकृितक गैस को िव"व के सभी दशे ; म7 ऊजा(cid:14) बा(cid:17)क ेट म7 &ाथिमक dधन के 4प म7 उभरकर सामने आने म7 सहायक ह।- &ाकृितक गैस क(cid:11) मांग िपछले दो दशक; म7 बIत तेजी से बढ़ी ह।ै <+k भारत म7 &ाकृितक गैस BेG का मह(cid:29)व िवशेष 4प से िपछले दो दशक; म7 ब ह ै और इसे 21वP सदी के dधन के <+h 4प म7 माना जा रहा ह।ै िव(cid:3)ुत BेG म7 &ाकृितक गैस क(cid:11) मांग ब ह,ै परंत ु मांग के अनु4प इसक(cid:11) आपूKत क(cid:11) गित धीमी ह।ै ((((iiiiiiii)))) गगगगससैैससैै आआआआधधधधााााIIIIररररतततत पपपपााााववववरररर QQQQलल लल ााााटटंंटटंं **** ककककोोोो गगगगससैैससैै कककक++++ आआआआपपपप00ूू00ूू तततत :::: M+ दशे म7 िव(cid:3)ुत BेG सिहत गैस क(cid:11) बढ़ रही मांग के अनु4प गैस का उ(cid:29)प ादन और आपूKत गित नहP पक पा रही ह।ै िपछले कुछ वषV के दौरान गसै आधाOरत पावर Jल ांट; को आपूत(cid:14) क(cid:11) गई गैस के िववरण नीचे 9दए गए ह - : ततततााााििििललललककककाााा 11111111....4444 ####.... ववववषषषष (cid:15)(cid:15) (cid:15)(cid:15) ववववषषषष (cid:15)(cid:15) (cid:15)(cid:15)ककककेेेे अअअअततंंततंं मममम (cid:13)(cid:13) (cid:13)(cid:13) आआआआवववव////यय यय कककक गगगगससैैससैै गगगगससैैससैै कककक5555 औऔऔऔससससतततत ककककममममीीीी सससस..ंं..ंं (cid:17)(cid:17)(cid:17)(cid:17)ममममतततताााा ((((एएएएममममएएएएममममएएएएससससससससीीीीएएएएममममडडडडीीीी)))) आआआआपपपपBBूूBBूू तततत ((((एएएएममममएएएएममममएएएएससससससससीीीीएएएएममममडडडडीीीी)))))))) ((((ममममगगेेगगेे ााााववववााााटटटट)))) ((((एएएएममममएएएएममममएएएएससससससससीीीीएएएएममममडडडडीीीी)))) ((((1111)))) ((((2222)))) ((((3333)))) ((((4444)))) ((((5555)))) ((((6666))))====((((4444))))----((((5555)))) 1111 2000-01 9028.70 44.54 24.40 22220000....11114444 2222 2001-02 9432.90 46.31 24.33 22221111....99998888 3333 2002-03 9949.00 48.26 25.12 22223333....11114444 4444 2003-04 10,154.90 49.25 25.62 22223333....66663333 5555 2004-05 10,224.90 49.73 30.70 11119999....00003333 6666 2005-06 10,919.62 53.38 35.37 11118888....00001111 7777 2006-07 12,444.42 61.18 35.10 22226666....00008888 8888 2007-08 13,408.92 65.67 38.14 22227777....55553333 9999 2008-09 13,599.62 66.61 37.45 22229999....11116666 11110000 2009-10 15,769.27 78.09 55.45 22222222....66664444 11111111 2010-11 16,639.77 81.42 59.31 22222222....11111111 11112222 2011-12 16,926.27 81.78 55.98 25.80226 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] केजी बेिसन (डी-6) स े गैस का उ(cid:29)प ादन अ&ैल, 2009 से शु4 9कया गया ह।ै अब तक ईजीओएम न े केजी-डी-6 बेिसन स े लगभग 80 एमएमएससीएमडी गैस के अनुमािनत उ(cid:29)प ादन के आधार पर मौजूदा पावर Jल ांट; को गैस आवंOटत क(cid:11) ह।ै वत(cid:14)मान म7 केजीजी-6 बेिसन के उ(cid:29)प ादन म7 िपछले वष (cid:14) लगभग 60 एमएमएससीएमडी उ(cid:29)प ादन क(cid:11) तुलना म7 लगभग 24 एमएमएससीएमडी क(cid:11) कमी आई ह।ै अTय BेG; से भी गैस का उ(cid:29)प ादन इन BेG; का (cid:17)त र घटन े के कारण 9दन &ित9दन घटता जा रहा ह।ै घरेलू (cid:17)त र पर गैस क(cid:11) कम उपल+ध ता को Qय ान म7 रखते Iए दशे म7 मौजूदा पावर Jल ांट; को कम माGा म7 गैस क(cid:11) आपूKत क(cid:11) जा रही ह।ै इसके पOरणाम(cid:17)व 4प इन पावर Jल ांट; का इRट तम सदपु योग नहP हो पा रहा ह।ै ((((iiiiiiiiiiii)))) गगगगससैैससैै कककक++++ ककककममममीीीी ककककेेेे ककककााााररररणणणण उउउउ####पप पप ााााददददनननन हहहहााााििििनननन गैस कम माGा म7 उपल+ध हो पा रही ह।ै इसके पOरणाम(cid:17)व 4प िव(cid:3)ुत उ(cid:29)प ादन क(cid:11) हािन हो रही ह।ै य9द गैस आधाOरत पावर (cid:17)ट ेशन;, िजनम7 वैकि_पक dधन जैसे ने{था, एचएसडी के इ(cid:17)त ेमाल का िवक_प उपल+ध ह,ै वहा ं ऐसे dधन; का &योग कर उ(cid:29)प ादन सुिवधा का िव(cid:17)त ार 9कया गया। तरल dधन; क(cid:11) मौजूदा उ5च लागत के कारण <+ उ(cid:29)प ादन लागत भी ब जाती ह,ै इन dधन; का &योग करते Iए उ(cid:29)प ादन हालां9क लाभाKथय; aारा आव"य कता / (cid:17)व कृित पर आधाOरत था। सीईए को दी गई सूचना के अनुसार गैस क(cid:11) उपल+ध ता म7 कमी के कारण और 90% पीएलएफ पर पावर Jल ांट; के संभािवत &चालन के आधार पर उ(cid:29)प ादन क(cid:11) हािन के िववरण िनXन ानुसार ह - : ततततााााििििललललककककाााा 11111111....5555 ####.... सससस..ंं..ंं ववववषषषष (cid:15)(cid:15) (cid:15)(cid:15) ववववषषषष (cid:15)(cid:15) (cid:15)(cid:15)ककककेेेे ददददौौौौरररराााानननन उउउउ(cid:20)(cid:20)(cid:20)(cid:20)पप पप ााााददददनननन हहहहााााििििनननन ((((ििििबबबबििििललललययययनननन ययययििूूििूू ननननटटटट)))) गगगगससैैससैै आआआआधधधधााााIIIIररररतततत पपपपााााववववरररर ''''टट टट ेेशशेेशशनननन**** llllाााारररराााा 99990000%%%% पपपपीीीीएएएएललललएएएएफफफफ पपपपरररर गगगगससैैससैै पपपपााााववववरररर QQQQलल लल ााााटटंंटटंं **** ससससीीीीईईईईएएएए ककककोोोो ददददीीीी गगगगईईईई ससससचचूूचचूू ननननाााा ककककेेेे अअअअननननससुुससुु ाााारररर ककककेेेे ससससभभंंभभंं ााााििििववववतततत &&&&चचचचााााललललनननन ककककेेेे आआआआधधधधाााारररर पपपपरररर 1111 2004-05 7.03 22223333....77771111 2222 2005-06 7.69 22223333....88888888 3333 2006-07 8.06 22226666....33333333 4444 2007-08 9.34 33331111....11117777 5555 2008-09 11.99 33333333....77771111 6666 2009-10 3.24 22225555....00002222 7 2010-11 6.39 22228888....22227777 8 2011-12 10.01 33332222....99997777 ((((iiiivvvv)))) ककककममममीीीी अअअअततंंततंं रररराााालललल ककककोोोो पपपपररूूररूू ाााा ककककररररनननन ेे ेेककककेेेे ििििललललएएएए ससससररररककककाााारररर llllाााारररराााा उउउउठठठठााााएएएए गगगगएएएए ककककददददमममम भारत सरकार ने गैस आपूKत के िव(cid:17)त ार और घरेलू बाजार के िलए मांग और आपूKत के बीच अंतर को दरू करने के िलए एक बIआयामी रणनीित अपनाई ह।ै इसम7 िनXन िलिखत तFय शािमल ह - :- ● एमओपी एsड एनजी गैस BGे ;/कु6 से &ाकृितक गैस का उ(cid:29)प ादन बढ़ाने के िलए आव"य क कदम उठा रहा ह।ै ● एमओपी एsड एनजी Tय ू ए* सJल ोरेशन लाइस7Dसग पॉिलसी (एनईएलपी) के अंतग(cid:14)त दशे के िविभTन बेिसन; M+s म7 ए*स Jल ोरेशन और &ोड* शन (ई एsड पी) से जु काय(cid:14)कलाप; के िलए गैस +ल ॉक; के अिधिनण(cid:14)य aारा <+k घरेलू bोत; से गैस क(cid:11) उपल+ध ता ब ने के िलए आव"य क कदम उठा रहा ह।ै¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 227 ● एमओपी एsड जी तरल &ाकृितक गैस (एल एsड जी) के 4प म7 गैस का आयात &ो(cid:29)स ािहत कर रहा ह ै और अंतरा(cid:14)RS ीय पाइप लाइन पOरयोजना6 के जOरए गैस के आयात हते ु भी &यास कर रहा ह।ै ● कोयला संपTन BेG; से &ाकृितक गैस के नए bोत; क(cid:11) सभं ावना तलाशने और उ(cid:29)प ादन शु4 करने के उZ"े य स े सरकार न े कोल बेड मीथेन (सीबीएम) नीित तैयार क(cid:11) ह।ै इस नीित के अंतगत(cid:14) दशे म7 सीबीएम क(cid:11) संभावनाए ं तलाशन े और उ(cid:29)प ादन के िलए आकष(cid:14)क राजकोषीय और संिवदागत ढांच े का &ावधान 9कया गया ह।ै ● सरकार इन अNणी &ौ(cid:3)ोिग9कय; के िवकास म7 िनजी उ(cid:3)िमय; aारा भूिमगत कोयला गैसीकरण (यूजीसीजी) और कोयला तरलीकरण तथा िनवेश को &ो(cid:29)स ािहत कर रही ह।ै अंितम &योग के 4प म7 कोयला के गैसीकरण और तरलीकरण के िविनदशl ; वाली अिधसूचना 12 जुलाई, 2007 को भारत के राजपG म7 &कािशत क(cid:11) गई ह।ै ● हाइ[डे संसाधन; और उनके यथा (cid:15)य वहाय (cid:14) वािणि/यक दोहन के मू_य ांकन हते ु &ाकृितक गैस हाइ[डे काय(cid:14)Uम (एनजीएचपी) का काया(cid:14)Tव यन। ● भिवRय म7 सभी घरेलू गैस; के िलए सरकार क(cid:11) गैस सदपु योग नीित को अंितम 4प दते े समय िव(cid:3)ुत BेG को &ाथिमकता दने े के िलए सरकार स े बातचीत करने के िलए भी &यास 9कए जा रह े ह।- ● केजी बेिसन (डी-6) से आरआईएल गैस के िलए आवंटन करते समय िव(cid:3)ुत BेG को &ाथिमकता दी गई ह।ै ● योजना आयोग ने ‘’&ाकृितक गैस मू_य ; क(cid:11) पूDलग’’ के िलए नीित पर सौिमG चौधरी क(cid:11) अQय Bता म7 एक अंतरमंGालयी सिमित गOठत क(cid:11) थी। सिमित ने अपनी Oरपोट(cid:14) अग(cid:17)त , 2011 म7 &(cid:17)त ुत क(cid:11) ह।ै सिमित न े िव(cid:3)ुत BेG म7 आरएलएनजी क(cid:11) िह(cid:17)स ेदारी बढ़ाने पर जोर 9दया ह।ै ((((vvvv)))) 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) पपपपचचंंचचंं ववववषषषष(cid:14)(cid:14)(cid:14)(cid:14)यययय ययययोोोोजजजजननननाााा ककककेेेे ििििललललएएएए ििििवववव(cid:25)(cid:25)(cid:25)(cid:25)ततुुततुु (cid:26)(cid:26)(cid:26)(cid:26)(cid:27)(cid:27)ेे(cid:27)(cid:27)ेे कककक++++ गगगगससैैससैै आआआआवववव----यय यय ककककतततताााा।।।। <+ 12वP पंचवषhय योजना के दौरान िव(cid:3)ुत क(cid:11) ब ती Iई मांग को पूरा करने के िलए िव(cid:3)ुत BेG म7 लगभग 88,000 मेगावाट क(cid:11) Bमता अिभवृिH आव"य क होगी। घरेलू गैस क(cid:11) अिनि?त उपल+ध ता के कारण 12वP पंचवषhय योजना के िलए केवल 2540 मेगावाट गैस आधाOरत Bमता पर िवचार 9कया गया ह ै अथात(cid:14) ् इसम7 केवल उन पOरयोजना6 को शािमल 9कया गया ह,ै िजनके िलए (cid:17)थ ानीय bोत; से गैस क(cid:11) उपल+ध ता सिु नि?त ह ै अथवा 11वP योजना के दौरान पूरी न हो पाई पOरयोजना6 को इसम7 शािमल 9कया गया ह।ै हालां9क कोयला आधाOरत पावर Jल ांट; क(cid:11) तुलना म7 गैस आधाOरत पावर Jल ांट; के बIत से लाभ; को Qय ान म7 रखते Iए और काब(cid:14)न उ(cid:29)स ज(cid:14)न को कम करने के उZ"े य से गैस क(cid:11) उपल+ध ता के आधार पर लगभग 25000 मेगावाट गैस आधाOरत Bमता अिभवृिH के िलए योजना तैयार करने क(cid:11) आव"य कता ह।ै इसम7 से अिधकांश Bमता अिभवृिH आगामी 3 वषV म7 wाउन फ(cid:11)_ड साइट; अथवा Nीन फ(cid:11)_ड साइट; म7 क(cid:11) गई जहां भूिम से पहले से उपल+ध ह।ै वत(cid:14)मान म7 लगभग 13,000 मेगावाट गैस आधाOरत Bमता िनमा(cid:14)णाधीन ह ै और य9द गैस उपल+ध कराई जाती ह ै तो 12वP योजना के आरंिभक वषV म7 यह Bमता (cid:17)थ ािपत क(cid:11) जा सकती ह।ै M+h वष(cid:14) 2012-13 के अंत तक काफ(cid:11) ब माGा म7 कोयला आधाOरत Bमता &चािलत क(cid:11) जाएगी। दशे क(cid:11) आधारभतू लोड आव"य कता को Tय ूि*लयर, िपटहडे कोयला आधाOरत उ(cid:29)प ादन और आंिशक 4प से गैर-िपटहडे कोयला आधाOरत उ(cid:29)प ादन और गैस आधाOरत उ(cid:29)प ादन से पूरा 9कया जाएगा। मQय म और पीक लोड आव"य कता को हाइ[ो, नॉन-िपटहडे कोयला आधाOरत उ(cid:29)प ादन और गसै आधाOरत उ(cid:29)प ादन से पूरा करने क(cid:11) आव" यकता ह।ै पवन, सौर और लघु जल िव(cid:3)ुत पOरयोजना6 को ‘’अिनवाय(cid:14) 4प से जारी रखने वाले’’ उ(cid:29)प ादन के 4प म7 माना जाएगा और थम(cid:14)ल उ(cid:29)प ादन को कम करके इसे शािमल 9कया जाएगा। इस &कार 12वP योजना के दौरान और उसके बाद गैस आधाOरत पीqकग पावर Jल ांट; को बढ़ावा दने े क(cid:11) आव"य कता ह।ै 25,000 मेगावाट क(cid:11) अितOर*त गैस आधाOरत Bमता िनXन ानुसार क(cid:11) गई ह ै :228 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] ततततााााििििललललककककाााा 11111111....6666 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन गगगगससैैससैै आआआआवववव----यय यय ककककतततताााा ििििववववववववररररणणणण गगगगससैैससैै (cid:17)(cid:17)(cid:17)(cid:17)ममममतततताााा 77770000%%%% पपपपीीीीएएएएललललएएएएफफफफ पपपपरररर गगगगससैैससैै आआआआवववव////यय यय ककककतततताााा ममममेगेगेगेगााााववववााााटटटट मममम (cid:13)(cid:13) (cid:13)(cid:13) ((((एएएएममममएएएएममममएएएएससससससससीीीीएएएएममममडडडडीीीी)))) ससससीीीीससससीीीीएएएएचचचचपपपपीीीी (cid:17)(cid:17)(cid:17)(cid:17)ममममतततताााा 2222,,,,000000000000 8888....0000 EEEEााााउउउउनननन फफफफ5555FFFFडड डड ससससााााइइइइटटटट7777 अअअअथथथथववववाााा (cid:31)(cid:31)(cid:31)(cid:31)ीीीीनननन फफफफ5555FFFFडड डड ससससााााइइइइटटटट7777 22221111,,,,000000000000 77778888....0000 मममम (cid:13)(cid:13) (cid:13)(cid:13) गगगगससैैससैै आआआआधधधधाााा(cid:22)(cid:22)(cid:22)(cid:22)ररररतततत (cid:17)(cid:17)(cid:17)(cid:17)ममममतततताााा MMMMs+s+s+s+ बबबब शशशशहहहहरररर7777 ककककेेेे आआआआससससपपपपाााासससस अअअअववववििििGGGGथथथथतततत पपपपीीीीHHHHककककगगगग गगगगससैैससैै 2222,,,,000000000000 4444....0000**** आआआआधधधधाााा(cid:22)(cid:22)(cid:22)(cid:22)ररररतततत (cid:17)(cid:17)(cid:17)(cid:17)ममममतततताााा MMMM++++ जजजजोोोो 22225555,,,,000000000000 99990000....0000 * पीक लोड और आकि मक ि थितय! के िलए लगभग 5-6 घंटे /ित0दन के िलए िनधा(cid:8)(cid:25) रत /चालन गैस क(cid:11) कमी को दरू करने के िलए घरेलू गैस क(cid:11) आयाितत आरएलएनजी के साथ पूDलग एक बेहतर समाधान हो सकता ह।ै दशे म7 मौजूदा/&(cid:17)त ािवत एलएनजी टKमनल; क(cid:11) Bमता के आधार पर यह महसूस 9कया जाता ह ै 9क वष(cid:14) 2012-13 के अंत तक िव(cid:3)ुत BेG के िलए अितOर*त 40-50 एमएमएससीएमडी गैस उपल+ध कराई जा सकती ह ै जो दशे म7 लगभग 10,000 से 12,000 मेगावाट अितOर*त गैस आधाOरत पावर Jल ांट; के िलए सहायक हो सकती ह।ै एलएनजी अपेBाकृत मंहगा dधन होने के नाते इसे घरेलू गैस के साथ पूल 9कया जा सकता ह ै और एक नीितगत 9दशािनदशl के 4प म7 &ाकृितक गसै का साझा पूDलग मू_य 9UयािTवत 9कया जाए। य(cid:3)िप इसस े <+ उ(cid:29)प ादन क(cid:11) लागत ब सकती ह ै 9फर भी इससे दशे म7 गैस आधाOरत उ(cid:29)प ादन क(cid:11) विृ H को िनतातं आव"य क बल िमलेगा। गैस आधाOरत उ(cid:29)प ादन के हOरत िव(cid:3)ुत होन े के कारण इसके अंतKनिहत लाभ; को Q यान म7 रखत े Iए िनयामक आयोग; aारा गैस आधाOरत िव(cid:3)ुत के एक िनधा(cid:14)Oरत &ितशत क(cid:11) खरीद अिनवाय(cid:14) क(cid:11) जाए, ता9क गसै आधाOरत िव(cid:3)तु का अपेBाकृत अिधक टैOरफ िनधा(cid:14)Oरत 9कया जा सके और उस पर गैस के &ेषण म7 बढ़ो(cid:29)त री क(cid:11) जा सके। ((((vvvviiii)))) 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे अअअअििंंििंं ततततमममम ववववषषषष !! !!((((2222000011116666----11117777)))) ततततकककक गगगगससैैससैै कककक++++ ककककुुुुलललल आआआआवववव----यय यय ककककतततताााा 11वP योजना के अंत (31.3.2012) तक दशे म7 कुल गैस आधाOरत (cid:17)थ ािपत Bमता 18,381 मेगावाट थी। 90% पीएलएफ पर &ित 1000 वाट के िलए 4.8 एमएमएससीएमडी क(cid:11) सामाTय आव"य कता के आधार पर इन पOरयोजना6 के िलए गैस आव"य कता क(cid:11) गणना 88 एमएमएससीएमडी के 4प म7 क(cid:11) गई ह।ै 12वP योजना के <+k दौरान लगभग 25,000 मेगावाट क(cid:11) नई गैस आधाOरत Bमता को ब वा दने े के िलए लगभग 90 एमएमएससीएमडी गैस आव"य कता होगी। 12वP योजना के अंितम वष (cid:14) के दौरान गैस आव"य कता के िववरण नीचे तािलका म7 सBं ेप म7 9दए गए ह - : ततततााााििििललललककककाााा 11111111....7777 11112222 वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे अअअअििंंििंं ततततमममम ववववषषषष !!!!((((2222000011116666----11117777)))) ककककेेेे ििििललललएएएए गगगगससैैससैै आआआआवववव----यय यय ककककतततताााा* ( 11111111वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे अअअअततंंततंं ततततकककक गगगगससैैससैै आआआआवववव----यय यय ककककतततताााा 33331111....3333....2222000011112222 कककक++++ िििि''''थथथथिििितततत ककककेेेे 88 एएएएममममएएएएममममएएएएससससससससीीीीएएएएममममडडडडीीीी ) अअअअननननससुुससुु ाााारररर 11118888,,,,333388881111 ममममगगेेगगेे ााााववववााााटटटट कककक++++ ममममौौौौजजजजददूूददूू ाााा (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा ककककेेेे अअअअननननqqqqुुुु पपपप 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा कककक++++ पपपपIIIIररररययययोोोोजजजजननननाााा.... कककक++++ आआआआवववव----यय यय ककककतततताााा ((((22225555,,,,000000000000 ममममगगेेगगेे ााााववववााााटटटट 90 एएएएममममएएएएममममएएएएससससससससीीीीएएएएममममडडडडीीीी (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा ककककेेेे ििििललललएएएए)))) 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे अअअअििंंििंं ततततमममम ववववषषषष !! !!((((2222000011116666----11117777 ततततकककक गगगगससैैससैै कककक++++ ककककुुुुलललल आआआआवववव----यय यय ककककतततताााा)))) 178 एएएएममममएएएएममममएएएएससससससससीीीीएएएएममममडडडडीीीी¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 229 11111111....5555 ििििननननययययििुुििुु NNNNललललययययरररर ििििववववककककाााासससस घरेलू (cid:17)त र पर यूरेिनयम क(cid:11) कम उपल+ध ता अथवा Tय ूि*लयर सJल ायर Nुप aारा लगाए गए &ितबंध; के कारण यूरेिनयम dधन क(cid:11) अंतरा(cid:14)RS ीय (cid:17)त र पर आपूKत बंद हो जाने के कारण िपछले कुछ समय से परमाणु ऊजा(cid:14) Bमता सीिमत हो गई ह।ै अब य े &ितबंध हटा िलए गए ह - और हम उXम ीद कर सकत े ह - 9क दशे म7 Tय ूि*लयर उ(cid:29)प ादन Bमता का िवकास तेजी स े होगा। परमाणु ऊजा(cid:14) िवभाग (डीएई) ने घरेलू िविनमा(cid:14)ण Bमता के आधार पर घरेल ू योजना म7 53,00 मेगावाट Bमता अिभवृिH और 13वP योजना के दौरान 18,000 मगे ावाट Bमता अिभवृिH क(cid:11) पOरक_प ना क(cid:11) गई ह।ै आयाितत यरू ेिनयम क(cid:11) उपल+ध ता के बावजूद भी हम7 यूरेिनयम खान; के घरेलू िवकास को &ाथिमकता दने ी चािहए। इससे इस BेG का िवकास तेजी से होगा। भारतीय परमाणु ऊजा (cid:14) रणनीित तीन चरण वाले िवकास कायU(cid:14) म पर आधाOरत है, िजसम7 &थम चरण म7 पारंपOरक Tय ूि*लयर Oरए*ट र, िaतीय चरण म7 फा(cid:17)ट wीडर Oरए*ट र और ततृ ीय चरण म7 थोOरयम आधाOरत Oरए*ट र; का िवकास शािमल ह।ै तीसरे चरण तक सफलतापूव(cid:14)क पIचं न े स े हम 2050 के प"च ात ऊजा (cid:14) क(cid:11) दिृ n स े अपेBाकृत अिधक आ(cid:29)म िनभ(cid:14)र बन जाएगं े और भारत के (cid:15)य ापक थोOरयम संसाधन; का अिधकतम दोहन 9कया जा सकेगा। य9द हम घरेलू यूरेिनयम संसाधन; पर िनभ(cid:14)र रहते ह - तो पहले चरण म7 पीएचड+_ यूआर से Jल ांट; क(cid:11) Bमता 10,000 एमड+_ य ूई से अिधक नहP हो सकती ह।ै 10,000 एमड+_ य ूई क(cid:11) सीमा से फा(cid:17)ट wीडर Oरए*ट र &ोNाम क(cid:11) गित और माप सीिमत होगी और इस &कार Jल ूटोिनयम का उ(cid:29)प ादन &भािवत होगा जो थोOरयम क(cid:11) दर िनधा(cid:14)Oरत करता ह ै और िजसके आधार पर Tय ू9किलयर आधाOरत Jल ांट; का अिधकतम दोहन 9कया जा सकता ह।ै एनएसजी &ितबंध; को हटाए जान े से यरू ेिनयम का आयात शु4 होगा और हमारे &थम चरण स े काय(cid:14)Uम का Bमता आधार सुदढ़ृ होगा। सरकार ने दशे म7 Bमता आधार बढ़ाने के िलए एनएसजी के सद(cid:17)य ; से dधन और Tय ूि*लयर उप(cid:17)क र आपूKतकता(cid:14)6 से Oरए*ट र; का आयात शु4 करन े के िलए बIत से कदम उठाए ह।- zांस स े 300 टन यरू ेिनयम कं(cid:17)S ेट पहले ही आयात कर िलया गया ह।ै रिसयन फेडरेशन से 2000 टन यूरेिनयम पेले(cid:143)स क(cid:11) चरणबH ढंग से दीघ(cid:14)कालीन आपूKत के िलए &यास 9कए जा रह े ह।- फा(cid:17)ट wीडर Oरए*ट र कायU(cid:14) म का शुभारंभ कलप*क म म7 िनKमत 9कए जा रह े 500 एमड+_ य ूई फा(cid:17)ट wीडर Oरए*ट र के आ9द4प से क(cid:11) गई, िजसक(cid:11) (cid:17)थ ापना माच(cid:14), 2012 तक होने क(cid:11) संभावना ह।ै यह भारत म7 इस तरह क(cid:11) पहली पOरयोजना ह ै और इसका 9UयाTव यन भावनी, साव(cid:14)जिनक BेG क(cid:11) एक कंपनी aारा 9कया जा रहा ह,ै िजसक(cid:11) (cid:17)थ ापना ऐसी पOरयोजना6 और सभी भावी फा(cid:17)ट wीडर Oरए*ट र पOरयेाजना के काया(cid:14)Tव यन के &योजन से क(cid:11) गई। इस पOरयोजना क(cid:11) सफलतापूव(cid:14)क (cid:17)थ ापना से भिवRय म7 भारत के Tय ूि*लयर पावर काय(cid:14)Uम के तीन चरण; म7 िनधा(cid:14)Oरत िवकास लLय ; को &ाJत करने का माग(cid:14) &श(cid:17)त होगा। डीएई ने 13वP योजना के दौरान (cid:17)थ ापना के िलए 11वP योजना म7 700 एमड+_ य ूई पीएचड+_ य ूआरएस Bमता वाली 8 (cid:17)व दशे ी यूिनट; पर काय(cid:14) शू4 करने क(cid:11) पOरक_प ना क(cid:11) ह।ै चार यूिनट; के िलए पहले ही अनुमोदन &ाJत हो गया ह ै और उनका काय(cid:14) शु4 हो गया ह।ै इनक(cid:11) (cid:17)थ ापना 2016/2017 म7 अनसु ूिचत ह।ै अंतरा(cid:14)RS ीय सहयोग के आधार पर एलड+_ य ूआर पर भी काय(cid:14) शु4 करने क(cid:11) योजना ह।ै सरकार ने रिसयन फेडरेशन, यूएसए और zांस के सहयोग से एलड+_ य ूआरएस पर आधाOरत 6000-10000 एमड+_ य ूई Bमता वाल े Tय ूि*लयर पावर पाकV क(cid:11) (cid:17)थ ापना के िलए 5 तटवतh साइट; के संदभ (cid:14) म7 सैHांितक अनुमोदन &दान कर 9दया ह।ै इन Oरए*ट र; पर वा(cid:17)त िवक 4प से काय(cid:14) शु4 होन े के आधार पर 2032 तक &गामी 4प स े कुल 40,000 एमड+_ य ूई क(cid:11) कुल एलड+_ य ूआरएस Bमता अिभवृिH संभव ह।ै एलड+_ य ूआर के खपत 9कए गए dधन को पुन: संसािधत करन े सुरिBत एफबीआर तथा अितOर*त पीएचड+_ य ूआर म7 इसके &योग क(cid:11) योजना बनाई गई ह।ै इससे दीघा(cid:14)विध म 7 एफबीआर क(cid:11) Bमता और अिधक बढ़ेगी तथा दीघा(cid:14)विध म7 ऊजा(cid:14) सरु Bा क(cid:11) 9दशा म 7 भिवRय म7 और परमाणु dधन के आयात क(cid:11) आव"य कता के िबना परमाणु ऊजा(cid:14) क(cid:11) भूिमका भी बढ़ जाएगी। इससे परमाणु ऊजा(cid:14) क(cid:11) भूिमका और मह(cid:29)व पूण(cid:14) हो जाएगी *य ;9क यह दीघा(cid:14)विध म7 हमारी ऊजा(cid:14) सुरBा के िलए िनतातं आव"य क होगा।230 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] तीन चरण वाले Tय ूि*लयर ऊजा(cid:14) काय(cid:14)Uम के तीसरे चरण म7 थोOरयम का &योग करने म7 हमारी Bमता िवकिसत करने से पहले ऐसे कई जOटल &ौ(cid:3)ोिगक(cid:11)य मुZ े उभरकर सामने आएगं े, िजनका समाधान करना आव"य क ह।ै अितOर*त जनश ि|, अनुसंधान और िवकास म7 िनवेश तथा नई सुिवधा6 क(cid:11) आव"य कता का (cid:17)प Rट िव"ल ेषण और मू_य ांकन 9कए जाने क(cid:11) आव"य कता ह,ै िजसम7 11वP पंचवषhय योजना क(cid:11) शेष अविध म7 शािमल 9कए जान े वाले घटक शािमल ह;गे। इस संदभ(cid:14) म7 तैयार क(cid:11) गई अनुसिू चयां गंभीर Dचता का िवषय ह।- ------------++++++++++++------------¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 231 अअअअ(cid:2)(cid:2)(cid:2)(cid:2)यय यय ाााायययय 11112222 ऊऊऊऊजजजजाााा !! !!ससससररंंररंं (cid:26)(cid:26)(cid:26)(cid:26)णणणण औऔऔऔरररर ममममाााागगंंगगंं पपपप(cid:26)(cid:26)(cid:26)(cid:26) &&&&बबबबधधंंधधंं नननन 11112222....0000 पपपपृRृRृRृRठठ ठठ भभभभििूूििूू मममम भारत म7 Bमता (अथा(cid:14)त मेगावाट) और ऊजा(cid:14) (अथा(cid:14)त एमड+_ य ूएच) दोन; के संदभ(cid:14) म7 िव(cid:3)ुत क(cid:11) मांग और आपूKत के बीच अंतर तेजी से बढ़ रहा ह।ै दBता िजसके साथ ऊजा(cid:14) का &योग 9कफायती सेवाए ं &दान करने के िलए 9कया जाता ह,ै म7 सुधार स े (cid:17)थ ायी िवकास को बढ़ावा दने े और 9कफायत को &ित(cid:17)प धh बनाने का दोहरा लLय पूरा होता ह।ै तेजी से घट रह े ऊजा (cid:14) संसाधन; के संरBण के उZ"े य से ऊजा (cid:14) दBता और संरBण का मह(cid:29)व बढ़ गया ह ै और बढ़ी Iई आKथक समृिH के िलए ऊजा(cid:14) आव"य कता6 को पूरा करने और दसू री ओर वैिoक (cid:17)त र पर जलवायु पOरवत(cid:14)न के &भाव को Tय ूनतम करन े के िलए अ_प तथा मQय ाविध म7 ऊजा(cid:14) दBता को तजे ी स े (cid:17)व ीकार 9कया जा रहा ह ै और इसे एक सवा(cid:14)िधक लागत &भावी िवक_प माना जा रहा ह।ै ऊजा(cid:14) काय(cid:14) कुशलता संबंधी िवक_प ; से अिधक लागत वाली नई िव(cid:3)तु उ(cid:29)प ादन Bमता क(cid:11) आव"य कता कम हो सकती ह ै और चूं9क अिधकांश उ(cid:29)प ादन कोयला आधाOरत ह ै अत: ऊजा (cid:14) के उ(cid:29)प ादन और &योग से Nीन हाउस गैस (जीएचजी) के उ(cid:29)स ज(cid:14)न को भी कम 9कया जा सकता ह।ै िपछले एक दशक से भारत म7 ऊजा(cid:14) काय(cid:14)कुशलता पर काफ(cid:11) जोर 9दया जा गया ह ै और ऊजा(cid:14) तीYता लगभग 20- 25% घटी ह ै परंतु अभी भी कुछ ऐस े (cid:17)थ ान ह - जहां बाजार क(cid:11) िवफलता6, सचू ना, जोिखम; और िवभािजत &ो(cid:29)स ाहन; के कारण ऊजा(cid:14) दBता क(cid:11) अपार संभावनाए ं ह।- यह भारत सरकार के जOरए ऊजा (cid:14) सरंBण अिधिनयम और ऊजा(cid:14) कायक(cid:14) ुलशलता +य रू ो aारा शु4 9कए गए बIत से काय(cid:14)Uम; के पOरणाम(cid:17)व 4प संभव Iआ ह।ै ऊजा(cid:14) संरBण अिधिनयम (2001) भारत म7 सबसे मह(cid:29)व पूण(cid:14) बI-BेGीय िवधान ह ै और इसका उZ"े य भारत म 7 ऊजा(cid:14) के कुशल &योग को बढ़ावा दने ा ह।ै इस अिधिनयम म7 उप(cid:17)क र; और उपकरण; के िलए ऊजा(cid:14) खपत मानक िविनpदRट करने, नािमत उपभो*त ा6 के िलए ऊजा (cid:14) खपत संबंधी शत(cid:144) और मानक (cid:17)थ ािपत व िनधा(cid:14)Oरत करने, वािणि/यक भवन; म7 ऊजा(cid:14) के कुशल &योग हते ु ऊजा(cid:14) संरBण िबD_डग कोड िनधा(cid:14)Oरत करने और ऊजा(cid:14) संरBण शतV और मानदडं ; के िलए एक अनुपालन (cid:15)य व(cid:17)थ ा (cid:17)थ ािपत करने का &ावधान 9कया गया ह।ै (cid:15)य ापक पैमाने पर232 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] ऊजा(cid:14) क(cid:11) बचत मौजूदा नीितय; और योजना6 के सुदढ़ृ ीकरण के साथ साथ 12वP पंचवषhय योजना म7 नए BेG; तक पIचं (cid:17)थ ािपत कर क(cid:11) जा सकती ह।ै भारत क(cid:11) &ाथिमक ऊजा (cid:14) खपत 421 िमिलयन टन तले के समतु_य (एमटीओई) (2008; अंतरा(cid:14)RS ीय ऊजा (cid:14) एज7सी, 2009) ह,ै जो वष(cid:14) 2008 म7 वैिoक (cid:17)त र पर &ाथिमक ऊजा(cid:14) खपत के लगभग 3.5% के बराबर ह।ै &ित (cid:15)य ि| ऊजा(cid:14) क(cid:11) खपत महज 0.53 9कलोNाम तेल समत_ु य (केजीओई) ह ै जब9क वैिoक (cid:17)त र पर इसका औसत 1.82 केजीओई (2008; अंतरा(cid:14)RS ीय ऊजा(cid:14) एज7सी, 2009) ह।ै भारत म7 पया(cid:14)Jत घरेलू ऊजा(cid:14) संसाधन नहP ह ै और इसक(cid:11) बढ़ रही ऊजा(cid:14) आव"य कता6 को पूरा करने के िलए यह काफ(cid:11) हद तक आयात पर िनभर(cid:14) है। अंतरा(cid:14)RS ीय ऊजा(cid:14) एज7सी (आईईए) के अनुसार भारत क(cid:11) कुल ऊजा(cid:14) खपत म7 कोयला/पी क(cid:11) िह(cid:17)स ेदारी लगभग 40% ह।ै त(cid:29)प "च ात दहन योrय नवीकरणीय ऊजा(cid:14) bोत; और अपिशRट पदाथV क(cid:11) िह(cid:17)स ेदारी लगभग 27% ह।ै तेल क(cid:11) िह(cid:17)स ेदारी कुल ऊजा(cid:14) खपत के लगभग 24% के बराबर ह,ै &ाकृितक गैस 6% हाइ[ो इलेि*Sक पावर महज 2%, परमाणु ऊजा(cid:14) लगभग 1% और अTय नवीकरणीय ऊजा(cid:14) bोत 0.5% से भी कम ह।ै भारत क(cid:11) कुल ऊजा (cid:14) आव"य कता6 का लगभग 50% भाग आयात से पूरा 9कया जाता ह।ै ऊजा(cid:14) काय(cid:14)कुशलता +य ूरो (बीईई) जो िव(cid:3)ुत मंGालय का एक सांिविधक िनकाय ह,ै िविभTन िनयामक और संवध(cid:14)ना(cid:29)म क उपाय; के जOरए अथ(cid:14)(cid:15)य व(cid:17)थ ा म7 ऊजा (cid:14) दBता बढ़ान े और िविभTन काय(cid:14)Uम;/योजना6 का नेतृ(cid:29)व करने के िलए िजXम ेदार ह।ै इनम7 से कुछ &यास िनXन ानसु ार ह - : क) िनयामक आयोग; aारा िव(cid:3)ुत कंपिनय; को ईई/बीएसएम (cid:15)य य को टैOरफ के 4प म7 संघOटत करने क(cid:11) अनुमित। ख) िव(cid:3)ुत कंपिनय; म7 ईई/डीएसएम &कोRठ का गठन। ग) लोड कव(cid:14) को एक जैसा बनाने के उZ"े य से बड़ े औ(cid:3)ोिगक और वािणि/यक उपभो*त ा6 के िलए टाइम ऑफ ड े टैOरफ क(cid:11) शुtआत। घ) सह-उ(cid:29)प ादन को बढ़ावा दने े के िलए िNड aारा सह उ(cid:29)प ादक; (कंपनी क(cid:11) घोिषत (cid:29)य ा/य लागत; पर) स े िनधा(cid:14)Oरत मू_य पर िव(cid:3)ुत क(cid:11) खरीद का अिनवाय(cid:14) &वतन(cid:14) ङ) कुशल पंDपग &णािलय; को अपनाना और पंDपग लोड को ऑफ पीक घंट; म7 िश{ट करना च) ऊजा(cid:14) लेखापरीBा आविधक 4प से क(cid:11) जाए और सावज(cid:14) िनक भवन;, बड़ी (cid:17)थ ापना6 (संबH लोड >1 मेगावाट अथवा समतु_य ऊजा(cid:14) &योग >1एमवीए) और ऊजा(cid:14) क(cid:11) दिृ n से अिधक खपत वाले उ(cid:3)ोग; के िलए ऊजा(cid:14) लेखापरीBा अिनवाय(cid:14) बनाई जाए। 11112222 ....1111 ऊऊऊऊजजजजाााा !! !!ससससररंंररंं (cid:26)(cid:26)(cid:26)(cid:26)णणणण कककक++++ ससससभभभभंंंं ााााववववननननााााएएएए ंं ंं बीईई/एनपीसी Oरपोट(cid:14) 2009 के अनुसार भारत म7 िव(cid:3)तु ऊजा(cid:14) संरBण और संभावना6 क(cid:11) नीचे 9दए अनसु ार पहचान क(cid:11) गई ह।ै ऐसा अनुमान ह ै 9क भारत म7 मांग पB &बंधन और ऊजा (cid:14) कायक(cid:14) ुशलता के जOरए िविभTन से*ट र; म7 कुल 15-20% ऊजा(cid:14) बचत क(cid:11) संभावनाए ं ह।- भारत सरकार ने अथ(cid:14)(cid:15)य व(cid:17)थ ा क(cid:11) बढ़ रही मांग; को पूरा करन े के िलए वहनीय मू_य पर ऊजा(cid:14) उपल+ध ता म7 मह(cid:29)व पूण(cid:14) वृिH के िलए एक (cid:15)य ापक काय(cid:14)Uम शु4 9कया ह।ै जहां एक ओर Bमता अिभवृिH पर &मुख 4प से Qय ान केिTeत 9कया गया है, वहP दसू री ओर नवीकरणीय ऊजा(cid:14), परमाणु ऊजा(cid:14) के साथ ऊजा(cid:14) दBता एक ऐसा &मुख BेG ह,ै िजस पर (cid:17)थ ायी िवकास सुिनि?त करने के िलए िवशेष 4प से Qय ान 9दया जा रहा ह।ै ऊजा(cid:14) काय(cid:14)कुशलता नीित का उZ"े य एक बेहतर बाजार िनKमत करने तथा लगभग 20% क(cid:11) अनुमािनत Bमता अिभवृिH के िलए उपयु*त ि(cid:17)थितयां िनKमत करना, ऊजा(cid:14) संरBा अिधिनयम, 2001¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 233 का अिधिनयमन, ऊजा(cid:14) कायक(cid:14) ुशलता +य ूरो (बीईई) क(cid:11) (cid:17) थापना और उTन त ऊजा(cid:14) काय(cid:14)कुशलता के िलए राRS ीय िमशन इस 9दशा म 7 शु4 9कए गए कुछ मह(cid:29)व पूण(cid:14) &यास ह।- ऊजा (cid:14) संरBण और मांग पB &बंधन से भारत म 7 ऊजा (cid:14) क(cid:11) बचत के आंकड़ े िनXन िलिखत तािलका म7 दशा(cid:14)ए गए ह - : ततततााााििििललललककककाााा 11112222....1111 भभभभााााररररतततत मममम 66 66ििििवववव(cid:25)(cid:25)(cid:25)(cid:25)ततुुततुु ऊऊऊऊजजजजाााा !! !!कककक++++ खखखखपपपपतततत औऔऔऔरररर ससससररंंररंं (cid:26)(cid:26)(cid:26)(cid:26)णणणण कककक++++ ससससभभंंभभंं ााााववववननननााााएएएए ंं ंं ((((ििििबबबबििििललललययययनननन ययययििूूििूू ननननटटटट मममम))66))66 KKKK....सससस..ंं..ंं (cid:26)(cid:26)(cid:26)(cid:26)(cid:27)(cid:27)ेे(cid:27)(cid:27)ेे खखखखपपपपतततत बबबबचचचचतततत ससससभभंंभभंं ााााववववननननाााा %%%% बबबबचचचचतततत 1111.... कृिष पंDपग 92.33 27.79 33330000....00009999 2222.... वािणि/यक भवन /(cid:17)थ ापनाए,ं 9.92 1.98 11119999....99995555 िजनका संबH लोड>500 9कलोवाट ह ै 3333.... नगर िनगम 12.45 2.88 22223333....11113333 4444.... घरेल ू 120.92 24.16 11119999....99998888 5555.... उ(cid:3)ोग (एसएमई सिहत) 265.38 18.57 6666....99999999 जजजजोोोोड़ड़ड़ड़ 555500001111....00000000 77775555....33336666 11115555....00004444 ;;;;ोोोोतततत:::: बीईई////एनपीसी अQय यन, 2222000000009999 11112222....2222 ऊऊऊऊजजजजाााा !! !!ससससररंंररंं (cid:26)(cid:26)(cid:26)(cid:26)णणणण ((((ईईईईससससीीीी)))) अअअअििििधधधधििििननननययययमममम इस तFय को (cid:17)व ीकार करत े Iए 9क ऊजा (cid:14) का कुशल &योग और इसका संरBण मांग और आपूKत के अंतराल को समाJत करने का सबसे कम लागत वाला िवक_प ह,ै भारत सरकार ने ऊजा(cid:14) सरं Bण (ईसी) अिधिनयम, 2001 का अिधिनयमन और ऊजा (cid:14) कायक(cid:14) ुशलता +य ूरो क(cid:11) (cid:17)थ ापना क(cid:11) ह।ै इस अिधिनयम के अंतग(cid:14)त दशे म7 ऊजा(cid:14) क(cid:11) दिृ n से कुशल सेवा6 के िलए &दायगी (cid:15) यव(cid:17)थ ा को सं(cid:17)थ ागत बनान े और उसका सुदढ़ृ ीकरण करने का &ावधान 9कया गया ह ै और इसम7 िविभTन िनकाय;/संगठन; के बीच िनतांत आव"य क समTव य (cid:17)थ ािपत करने का भी &ावधान 9कया गया ह।ै +य ूरो नीितगत काय(cid:14)Uम; के काया(cid:14)Tव यन और ऊजा(cid:14) संरBण संबंधी काय(cid:14)कलाप; के काया(cid:14)Tव यन हते ु समTव य (cid:17)थ ािपत करने के िलए िजX मेदार होगा। बीईई का िमशन भारतीय अथ(cid:14)(cid:15)य व(cid:17)थ ा क(cid:11) ऊजा(cid:14) संवे9दता को कम करने के &ाथिमक उZ"े य के साथ ऊजा(cid:14) संरBण अिधिनयम के (cid:15)य ापक ढांचे म7 (cid:17)व िविनयमन और बाजार िसHांत; पर जोर दते े Iए नीितयां और रणनीितया ं तैयार करना ह।ै 11112222....3333 ईईईईससससीीीी अअअअििििधधधधििििननननययययमममम 2222000000001111 ककककेेेे &&&&ााााववववधधधधाााानननन**** ककककेेेे अअअअततंंततंं गगगगतत!!तत!! ककककााााययययKK!!KK!! मममम औऔऔऔरररर उउउउपपपपाााायययय ऊजा(cid:14) संरBण और ऊजा(cid:14) दBता को बढ़ाने के उZ"े य से बीईई aारा िविभTन योजनाए ं शु4 क(cid:11) गई ह,- ये िनXन ानुसार ह - : 1. ऊजा(cid:14) संरBण िबD_डग कोड 2. बचत ल-प योजना 3. रा/य aारा नािमत एज7िसय; का सुदढ़ृ ीकरण 4. मानक और लेबDलग काय(cid:14)Uम234 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] 5. नगर िनगम का मांगपB &बंधन (एमयूडीएसएम) 6. कृिष का मांग पB &बंधन (एजीडीएसएम) 7. लघु और मQय म उ(cid:3)म; (एसएमई) म7 ऊजा(cid:14) काय(cid:14)कुशलता और नािमत उपभो*त ा 8. (cid:15)य ावसाियक &माणन और अिध&माणन 9. िनयम पु(cid:17)त क और आचार सिं हताए ं 10. ऊजा(cid:14) काय(cid:14)कुशलता नीित अनसु ंधान कायU(cid:14) म 11. ऊजा(cid:14) सेवा6 के िलए &दायगी (cid:15)य व(cid:17)थ ाए/ं तंG, और 12. (cid:17)क ूली िशBा/जाग4कता आ9द 11112222....3333....1111 ऊऊऊऊजजजजाााा !! !! ससससररंंररंं (cid:26)(cid:26)(cid:26)(cid:26)णणणण ििििबबबबaaaaYYYYडडडडगगगग ककककोोोोडडडड ((((ईईईईससससीीीीबबबबीीीीससससीीीी)))) :::: 100 9कलोवाट और उसस े अिधक के सबं H लोड वाली नई वािणि/यक िबD_डग; के िलए Tय ूनतम ऊजा (cid:14) िनRप ादन मानक (cid:17)थ ािपत करने के साथ साथ OरSो9फ€टग के जOरए मौजूदा िबD_डग; म7 ऊजा(cid:14) काय(cid:14)कुशलता को बढ़ावा दने े हते ु ऊजा(cid:14) संरBण कोड (ईसीबीसी) का शुभारंभ 27 मई, 2007 को 9कया गया। वत(cid:14)मान म7 यह कोड काया(cid:14)Tव यन के (cid:17)व ैि5छक चरण पर ह।ै जहां एक ओर बीईई aारा ईसीबीसी का िवकास 9कया गया ह,ै वहP इनके &वत(cid:14)न का दािय(cid:29)व रा/य सरकार; और शहरी (cid:17)थ ानीय िनकाय; के पास ह।ै बIत स े रा/य ; न े अपने रा/य के िलए ईसीबीसी का पहले ही संशोधन कर िलया ह,ै िजसम7 से उड़ीसा, राज(cid:17)थ ान, कना(cid:14)टक, उ(cid:29)त र &दशे , पुs डुचेरी और उ(cid:29)त राखंड ने यह काय(cid:14) पूरा कर िलया ह ै और पंजाब, छ(cid:29)त ीसगढ़ और गुजरात जैस े रा/य म7 ईसीबीसी क(cid:11) &9Uया का संशोधन अंितम चरण पर ह।ै िनKमत वातावरण म7 ईसीबीसी को अपनाने के िलए &ो(cid:29)स ािहत करन े हते ु 11वP पंचवषhय योजना के दौरान बIत स े समथ(cid:14)कारी उपाय 9कए गए। इनम7 (1) ईसीबीसी िवशेष‡ आक‘टे*ट का पैनल तैयार करना, (2) ईसीबीसी &यो*त ा गाइड, लाइ€टग के िलए Oटप शीट, एनवलप, एचवीएसी, िसमुलेशन जसै ी तकनीक(cid:11) संदभ(cid:14) सामNी का िवकास; (3) आक‘टे*ट / िडजाइन (cid:15)य वसाियय; और कोड आव"य कता6 के साथ सम4पता मू_य ांकन करन े के िलए कोड अनुपालन अिधकाOरय; क(cid:11) सहायता के िलए सम4पता/अनुपालन जांच उपकरण; (ईकोिनमा(cid:14)ण) का िवकास, (4) कोड के िविभTन पहलु6 को शािमल करते Iए मानक ईसीबीसी &िशBण मॉ’ूल, (5) ऊजा(cid:14) काय(cid:14)कुशलता पर मसौदा राRS ीय (cid:17)थ ायी पया(cid:14)वास मानदडं तैयार करने के िलए आवासीय और वािणि/यक भवन;/पOरसर; के िलए Tय ूनतम ऊजा(cid:14) मानक अिधदिे शत करने हते ु मॉडल िबD_डग बाई लॉज का िवकास, (6) राRS ीय िबD_डग कोड (एनबीसी), 2005 के साथ ईसीबीसी का सतं ुलन (cid:17)थ ािपत करने जैस े उपाय; को अंितम 4प 9दया गया ह।ै इसके िलए ''ि(cid:17)थरता के िलए पहल’’ नामक एक अQय ाय जोड़ा गया ह ै और (cid:15)य ापक पOरचालन हते ु भजे ा गया ह।ै इसके प"च ात दशे म7 सभी भावी िनमा(cid:14)ण म7 इसे अपनाया जाएगा; (7) सीपीड+_ य ूडी क(cid:11) दर अनुसूची म7 मसौदा संशोधन 9कए गए ह-, ता9क ईसीबीसी क(cid:11) आव"य कता6 को उसम7 शािमल 9कए जा सके और उTह 7 आगामी कार(cid:14)वाई के िलए सीपीड+_ य ूडी को &(cid:17)त ुत 9कया गया ह।ै ''समाहारी वृिH के िलए कम काब(cid:14)न रणनीितय;’’ पर मसौदा Oरपोट(cid:14) म7 यह दशा(cid:14)या गया ह ै 9क नई वािणि/यक पOरसर; के िलए ईसीबीसी को अिनवाय (cid:14) बनाने और मौजूदा भवन; म7 ऊजा (cid:14) लेखापरीBा लागू करने स े 12वP योजना के दौरान शु4 क(cid:11) जाने वाली 75% नई वािणि/यक िबD_डग; म7 ईसीबीसी का अनुपालन 9कया जाएगा। इसी &कार 20% मौजूदा िबD_डग; म7 ऊजा(cid:14) लेखापरीBा और OरSो9फ€टग के जOरए वत(cid:14)मान ऊजा (cid:14) खपत म7 कम स े कम 20% क(cid:11) कमी क(cid:11) जाएगी। इसके पOरणाम(cid:17)व 4प सामाTय (cid:15)य ापार (बीएयू) पOरद"ृ य म7 नई और मौजूदा िबD_डग; म7 ऊजा(cid:14) &योग क(cid:11) अनुमािनत बचत लगभग 5.07 िबिलयन यूिनट ह।ै¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 235 िबD_डग; म7 ऊजा(cid:14) लेखापरीBा अQय यन; से पता चला ह ै 9क सरकारी और वािणि/यक काया(cid:14)लय; के भवन; म 7 ऊजा(cid:14) बचत क(cid:11) अपार संभावनाए ं ह।- बीईई ऐसी ऊजा(cid:14) सवे ा कंपिनय; (ईएससीओ) के जOरए मौजूदा िबD_डग; म7 ऊजा(cid:14) काय(cid:14)कुशलता उपाय; के काया(cid:14)Tव यन को बढ़ावा द े रहा ह,ै जो एक नवोTम ेषी (cid:15)य ापार मॉडल उपल+ध कराती ह,- िजसके जOरए मौजूदा िबD_डग; म7 ऊजा(cid:14) बचत क(cid:11) संभावना6 का लाभ उठाया जा सकता ह ै और िबD_डग; के मािलक; के समB मौजूदा जोिखम; का समाधान भी 9कया जा सकता ह।ै समय समय पर और बार बार यह दखे ा गया ह ै 9क ऐसी िबD_डग; म7 ऊजा(cid:14) संरBण का लL य सु‡ात ह(cid:17)त Bेप के जOरए &ाJत 9कया जा सकता ह,ै जो लागत &भावी भी ह,ै हालां9क इन ह(cid:17)त Bेप; का काया(cid:14)Tव यन सं(cid:17)थ ागत, &9Uयागत और संसाधन संबधं ी बाधा6 से &भािवत होता ह,ै िवशेष 4प से यह &भाव इन ह(cid:17)त Bेप; के कारण ऊजा(cid:14) क(cid:11) बचत का मू_य ांकन करने और गारंटी &दान करने म7 िबD_डग; &बंधक; क(cid:11) अBमता के कारण पड़ता ह।ै इस सं(cid:17)थ ागत बाधा का समाधान करने के उZ"े य से ऊजा (cid:14) काय(cid:14) कुशलता +य ूरो ने ऊजा(cid:14) काय(cid:14) कुशलता सेवा6 को सं(cid:17)थ ागत ढंग से शु4 करन े और ऊजा(cid:14) कायक(cid:14) ुशलता &दायगी (cid:15)य व(cid:17)थ ा6 जैसे ऊजा(cid:14) सेवा कंपिनय; (ईएससीओ) के िलए बाजार का िवकास आ9द को बढ़ावा दने े के िलए &यास शु4 9कए ह-, जो भवन के (cid:17)व ािमय; aारा पOरकि_पत जोिखम; का समाधान करती ह।- ईएससीओ एक ऐसा (cid:15)य वसाय मॉडल उपल+ध कराता ह,ै िजसके जOरए मौजूदा िबD_डग; म7 ऊजा(cid:14) बचत क(cid:11) संभावना6 का पता लगाया जा सकता ह ै और िबD_डग के मािलक; के समB मौजूदा जोिखम; का भी समाधान 9कया जा सकता ह।ै ईएससीओ aारा 9कए गए ह(cid:17)त Bेप; के जOरए ऊजा(cid:14) बचत के लLय को &ाJत करन े के िलए िनRप ादन संिवदा आधाOरत भुगतान यह सुिनि?त करते ह - 9क बचत का लLय &ाJत 9कया गया ह ै और ईएससीओ को िबD_डग के मािलक; aारा 9कए गए भुगतान इन बचत क(cid:11) उपलि+ध से संबंिधत ह।- संभािवत एज7िसय; जो 9कसी एससीओ क(cid:11) सेवाए ं सुरिBत करन े वाली ह-, के साथ साथ िव(cid:29)त ीय सं(cid:17)थ ान; के बीच िव"व सनीयता पैदा करन े के उZ"े य से बीईई िनRप ादन संिवदा, तकनीक(cid:11) जनशि| क(cid:11) उपल+ध ता, िव(cid:29)त ीय मजबूती आ9द के आधार पर ऊजा(cid:14) काय(cid:14)कुलशलता पOरयोजना6 के काया(cid:14)Tव यन म7 सफलता के संदभ(cid:14) म7 इन आवेदक; क(cid:11) रे€टग &9Uया के जOरए ईएससीओ के िलए एक अिध&माणन कार(cid:14)वाई करता ह।ै रे€टग क(cid:11) कार(cid:14)वाई सेवी aारा अिध&मािणत एज7िसय; जैस े सीआरआईएसआईएल, सीएआरई और आईसीआरए के जOरए क(cid:11) जाती ह।ै इस कार(cid:14)वाई के पOरणाम साव(cid:14)जिनक तौर पर उपल+ध कराए जात े ह - और िविभTन रा/य सरकार;/एसडीए को भी इसक(cid:11) जानकारी दी जा सकती ह,ै ता9क उTह 7 अपने संगत रा/य ; म7 ऊजा (cid:14) कायक(cid:14) ुशलता काय(cid:14)Uम; के काया(cid:14)Tव यन म 7 सुिवधा हो सके। बीईई न े ईएससीओ स े बोिलया ं आमंिGत करने के िलए एसडीए/िबD_डग के मािलक;/रा/य सरकार; क(cid:11) सहायता, डीपीआर म7 मौजूदा खािमय; को दरू करने के िलए इनवे(cid:17)ट म7ट Nेड एनजh ऑिडट (आईजीईए), ऊजा(cid:14) काय(cid:14)कुशलता के काया(cid:14)Tव यन हते ु मसौदा िनRप ादन संिवदा, आईपीएमवीपी 9दशािनदशl ; के आधार पर मानक एम और वी योजना के मू_य ांकन मैOS*स के साथ &(cid:17)त ाव; के िलए अनुरोध (आरएफपी) के िलए मसौदा मानक टेXJ ल ेट तैयार 9कए ह।- वािणि/यक भवन BेG म7 ऊजा(cid:14) काय(cid:14)कुशलता संबंधी कायक(cid:14) लाप; म7 तेजी लाने के उZ"े य से बीईई ने 9दन म7 &योग 9कए जाने वाले भवन;, बीपीओ और शॉDपग कॉXJ ल े*स के िलए एक (cid:17)ट ार लेबDलग काय(cid:14)Uम ((cid:17)व ैि5छक) तैयार 9कया ह,ै जो 9कलोवाट घंटा/वग(cid:14) 9कलोमीटर/वष(cid:14) म7 ऊजा(cid:14) के िविशRट &योग के संदभ(cid:14) म7 िबD_डग के वा(cid:17)त िवक िनRप ादन पर आधाOरत ह।ै इस काय(cid:14)Uम के तहत िबD_डग; को 1-5 तक (cid:17)ट ार (cid:17)क ेल रे€टग &दान क(cid:11) जाती ह।ै 5 (cid:17)ट ार लेबल &ाJत िबD_डग को ऊजा(cid:14) क(cid:11) दिृ n से सवा(cid:14)िधक कुशल िबD_डग माना जाता ह।ै (cid:17)ट ार रे€टग काय(cid:14)Uम ऊजा(cid:14) कुशल िबD_डग; को साव(cid:14)जिनक माTय ता &दान करता ह ै और ऐसी िबD_डग; के िलए ''मांग पB’’ सृिजत करता ह।ै 100 9कलोवाट और उससे अिधक संबH लोड वाले भवन; पर बीईई (cid:17)ट ार रे€टग योजना के अंतगत(cid:14)236 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] िवचार 9कया जा रहा ह।ै 12वP योजना अविध म7 (cid:17)ट ार रे€टग योजना को अTय &कार क(cid:11) िबD_डग; के िलए भी लागू 9कया जाएगा। 11112222....3333....2222 बबबबचचचचतततत ललललपपiiपपii ययययोोोोजजजजननननाााा :::: दशे म7 िव(cid:3)ुत क(cid:11) कुल मांग म7 आवासीय BेG क(cid:11) िहस् स दे ारी 25.87% ह।ै लाइ€टग लोड म7 आवासीय BेG क(cid:11) इस िव(cid:3)तु मांग का लगभग 28% अंशदान ह ै और पीक लोड म7 भी इसका सवा(cid:14)िधक योगदान ह।ै आवासीय BेG म7 ऊजा(cid:14) बचत सीएलएफ के &योग को बढ़ावा दने े के िलए बीईई ने ''बचत ल-प योजना (बीएलवाई) तैयार क(cid:11) ह।ै बीएलवाई योजना के अंतग(cid:14)त सीएलएफ पूKतकता(cid:14) aारा िNड से जुड़ े आवासीय पOरवार; को अिधकतम 4 दीघा(cid:14)विध, गुणव(cid:29)त ा यु*त सीएफएल िवतOरत क(cid:11) जाएगं ी और उसके बदले म 7 उनस े उतनी ही संjय ा म7 इनकेिडस7ट ल-Jस (आईसीएल) और &ित सीएफएल 15 t. िलए जाएगं े। ऐसा अनुमान ह ै 9क एकल पOरयोजना के अंतग(cid:14)त लगभग 6 लाख सीएफएल िवतOरत क(cid:11) जा सकती ह।- बचत क(cid:11) गई िव(cid:3)ुत जो जीएचजी के उ(cid:29)स ज(cid:14)न का उTम ूलन करने म7 सहायक होगी, का इ(cid:17)त मे ाल सीएलएफ पूKतकता(cid:14)6 aारा *य ोटो &ोटोकॉल क(cid:11) (cid:17)व 5छ िवकास (cid:15)य व(cid:17)थ ा (सीडीएम) के अंतग(cid:14)त अंतरा(cid:14)RS ीय बाजार म7 9कया जाएगा। बीएलवाई योजना के अंतग(cid:14)त सामाTय त: &योग म7 जाए जाने वाले तीन &कार के आईसीएल ल-प अथा(cid:14)त 40 वाट, 60 वाट और 100 वाट के ब_ब ; को सीएफएल aारा &ित(cid:17)थ ािपत 9कया जाएगा। इस बचत ल-प योजना (cid:17)क (cid:11)म को सीडीएम के साथ संबH लेनदने लागत को कम करने के िलए यूएनएफसीसीसी के सीडीएम काय(cid:14)पालक बोड (cid:14) के साथ सीडीएम काय(cid:14)Uम क(cid:11) गितिविधय; (पीओए) के 4प म7 पंजीकृत 9कया गया ह।ै इस पOरयोजना के अंतग(cid:14)त तीन &मुख संगठन; (कंपिनय;) अथा(cid:14)त बीईई, िव(cid:3)ुत िवतरण कंपिनयां (िड(cid:17)क ॉम) और घर; म7 सीएफएल क(cid:11) आपूKत के िलए िनवेशक; को एक साथ िमलकर काय(cid:14) करने का अवसर 9दया जाता ह।ै सीएफएल के बाजार मू_य और वह मू_य िजस पर पOरवार; को िवतOरत क(cid:11) जानी है, के बीच लागत अंतर को दरू करन े के िलए (cid:17)व 5छ िवकास (cid:15)य व(cid:17)थ ा (सीडीएम) का लाभ उठाया जा रहा ह।ै सीएफएल पूKतकता (cid:14) (िनवशे क) पOरयोजना लागत क(cid:11) वसूली अपने संगत पOरयोजना BेG; म7 Nीन हाउस गैस (जीएचजी) उ(cid:29)स ज(cid:14)न को कम करके उसक(cid:11) िबU(cid:11) के जOरए कर7गे। बीईई, जो 9क समTव यकता(cid:14) और &बंधन िनकाय (सीएमई) ह,ै को यूएनएफसीसीसी (यूनाइटेड नेशंस zेमवक(cid:14) कTव 7शन फॉर *ल ाइमेट च7ज) और पीओए aारा यथाव"य क िविभTन &लेखन और &ोटोकॉल के संबंध म7 आव"य क कार(cid:14)वाई करने के िलए एक अिधकारी िनयु*त करना होगा। इसके अलावा बीएलवाई पOरयोजना6 के काया(cid:14)Tव यन और सीएफएल िवतरण को सुकर बनाने के िलए इस अिधकारी को रा/य क(cid:11) िव(cid:3)ुत िवतरण कंपिनय; और सीएफएल पूKतकता(cid:14)6 के साथ लगातार संपक(cid:14) म7 रहना होगा। अब तक भारत के िविभTन भाग; से इस पंजीकृत अXw ेला zेमवक(cid:14) म7 50 बीएलवाई पOरयोजना6 को शािमल 9कया गया ह।ै 11वP पंचवषhय योजना म 7 शािमल पOरयोजना6 के अतं ग(cid:14)त अभी तक 28 िमिलयन सीएफएल िवतOरत क(cid:11) जा चुक(cid:11) ह - और कुछ शािमल पOरयोजना BेG; म7 सीएफएल िवतरण का काय(cid:14) &गित पर ह।ै 11वP पंचवषhय योजना के दौरान 9दसंबर, 2011 तक सीएफएल के िवतरण से 324.3 मेगावाट िव(cid:3)ुत क(cid:11) बचत का लLय &ाJत 9कया गया ह।ै योजना का िडजाइन सीईआर का आधारभतू मू_य 8 यरू ो के 4प म7 िनधा(cid:14)Oरत कर तैयार 9कया गया। हालां9क अंतरा(cid:14)RS ीय (cid:17)त र पर जलवायु पOरवत(cid:14)न संबंधी बातचीत क(cid:11) अिनि?तता और यूरोप म7 आKथक मंदी के पOरणाम(cid:17)व 4प काब(cid:14)न बाजार क(cid:11) वत(cid:14)मान ि(cid:17)थित बIत अिधक आकष(cid:14)क &तीत नहP होती ह ै और सीईआर क(cid:11) क(cid:11)मत िपछले कई माह; स े 3-4 यूरो के बीच घटती-बढ़ती रही ह।ै इस सबके अलावा Sाई ब-ड फॉ(cid:17)फ ोर क(cid:11) क(cid:11)मत बढ़ने के कारण सीएफएल महं गे हो गए ह।- इन सभी घटक; के पOरणाम(cid:17)व 4प इस योजना क(cid:11) िव(cid:29)त ीय (cid:15)य वहाय(cid:14)ता &भािवत Iई ह।ै यह बीएलवाई के त व् Oरत काया(cid:14)Tव यन म7 एक बाधा के 4प म7 सामने आया ह।ै¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 237 बीएलवाई पOरयेाजना6 का डटे ाबेस &बंधन और रा/य िव(cid:3)ुत िवतरण कंपिनय; का Bमता िनमा(cid:14)ण तथा बीईई के काय(cid:14)कारी के साथ-साथ सीएफएल पूKतकता(cid:14)6 पर 12वP योजना म7 &मुखता के साथ Qय ान 9दया जाएगा। 12वP पंचवषhय योजना म7 9कए जाने वाले &(cid:17)त ािवत काय(cid:14)कलाप; म7 शािमल ह - : रा/य िव(cid:3)ुत िवतरण कंपिनय; क(cid:11) सहभािगता से वत(cid:14)मान म7 जारी बीएलवाई योजना का सदु ढ़ृ ीकरण, बीएलवाई योजना के संदभ(cid:14) म7 जाग4कता के िलए काय(cid:14)शालाए,ं पंजीकृत पीओए के अंतग(cid:14)त पOरयोजना6 को शािमल करना, बीएलवाई पOरयोजना6 क(cid:11) िनगरानी और स(cid:29)य ापन, यूएनएफ सीसीसी िनयम; के अनुसार पीओए का अ(cid:3)तनीकरण, एलईडी ब_ब ; क(cid:11) थोक खरीद के िलए 9दशािनदशl और &9Uयाए ं िनधा(cid:14)Oरत करना तथा योजना के अTय BेG और एलईडी पOरयोजना6 क(cid:11) िनगरानी तथा स(cid:29)य ापन। 11112222....3333....3333 ररररााााBBBBयय यय llllाााारररराााा ननननााााििििममममतततत एएएएजजजजिि66िि66 ससससयययय**** ((((एएएएससससडडडडीीीीएएएए)))) ककककाााा ससससददुुददुु ढ़ढ़ढ़ढ़ृृृृ ीीीीककककररररणणणण : रा/य aारा नािमत एज7िसयां (एसडीए) रा/य (cid:17)त र पर ऊजा(cid:14) सरं Bण उपाय; के काया(cid:14)Tव यन हते ु रा/य aारा (cid:17)थ ािपत सांिविधक िनकाय ह।- िविभTन रा/य ; म 7 रा/य aारा नािमत एज7िसय; (एसडीए) को रा/य (cid:17)त र पर िविभTन ऊजा (cid:14) काय(cid:14)कुशलता संबंधी &यास; को आग े बढ़ाने के संदभ(cid:14) म7 बIत ही मह(cid:29)व पूण(cid:14) भूिमका अदा करन े क(cid:11) आव"य कता ह।ै इस योजना का &मुख जोर इस बात पर ह ै 9क एसडीए का Bमता िनमा(cid:14)ण 9कया जाए िजससे 9क व े ऊजा(cid:14) सरं Bण अिधिनयम 2001 के अंतग(cid:14)त िनयामक सहयोगा(cid:29)म क और &वत(cid:14)न संबंधी काय(cid:14)कलाप िनRप ा9दत करन े म7 समथ(cid:14) बन सक7। 12वP योजना के दौरान एसडीए काय(cid:14)Uम का &मुख जोर 32 एसडीए के सुदढ़ृ ीकरण पर होगा जो बीईई अथवा (cid:17)व यं एसडीए aारा शु4 9कए गए िविभTन कायU(cid:14) म; और कायक(cid:14) लाप; के काया(cid:14)Tव यन हते ु उTह 7 सBम बनाएगा। 11वP पंचवषhय योजना के दौरान बीईई ने रा/य aारा नािमत एज7िसय; (एसडीए) को योजना तैयार करने, एसडीए के सं(cid:17)थ ागत Bमता िनमा(cid:14)ण और संगत रा/य ; म7 अपने िनयामक, िवकासा(cid:29)म क और संवध(cid:14)ना(cid:29)म क काय(cid:14)कलाप; को तकनीक(cid:11) सहायता, माग(cid:14) दश(cid:14)न और िनिधयन आ9द के 4प म7 सहयोग 9कया। &(cid:29)य ेक एसडीए को पंचवषhय ऊजा(cid:14) संरBण काय(cid:14) योजना िवकिसत करने, ईसी अिधिनयम के अिधदशे ; क(cid:11) &दायगी और उसके &ावधान; के अनु4प (cid:17)थ ानीय आव"य कता6 को अनुकूल बनाने म7 सहायता &दान क(cid:11) गई ह।ै 12वP पंचवषhय योजना के िलए &(cid:17)त ािवत काय(cid:14)कलाप; म7 नगर िनगम (पेयजल और सीवेज उपचार), कृिष (पंपDपग), (cid:17)S ीट लाइ€टग, वािणि/यक भवन;, सरकारी भवन; और &दश(cid:14)न पOरयोजना6 सिहत एसएमई म 7 अपिशR ट ऊR मा क(cid:11) &ित&ािŠ जैसे BेG; म7 BेG िवशेष पर आधाOरत ह(cid:17)त Bेप शािमल ह।- एसडीए के िनXन िलिखत &यास; को सहायता &दान करने का &(cid:17)त ाव ह ै जो एसडीए क(cid:11) Bमता6 को सुदढ़ृ करने और संगत रा/य ; म7 ऊजा (cid:14) काय(cid:14) कुशलता को बढ़ावा दने े वाली िविभTन पOरयोजना6 और कायाU(cid:14) म; का संचालन करने म7 सहायक ह;गे: • एसडीए aारा ऊजा (cid:14) क(cid:11) िवशषे बचत के िलए BेGवार काया(cid:14)Tव यन हते ु सहायता • एसडीए क(cid:11) ऊजा(cid:14) लेखापरीBक;, ऊजा(cid:14) &बंधक; और ईएससीओ जैस े ऊजा(cid:14) कायक(cid:14) ुशलता (cid:15)य वसाियय; के साथ लगातार सहभािगता • सवा(cid:14)िधक उTन त ऊजा (cid:14) कुशल &ौ(cid:3)ोिगक(cid:11) क(cid:11) &भावशीलता दशा(cid:14)न े के िलए रा/य ; म7 िविभTन ऊजा(cid:14) काय (cid:14) कुशलता &दश(cid:14)न पOरयोजना6 का काया(cid:14)Tव यन और रा/य के अTय भाग; म7 उन पOरयोजना6 को लागू करन े के िलए रा/य सरकार; के साथ बातचीत करना • गांव; म7 एलईडी Nाम अिभयान शु4 करना और रा/य के अTय भाग; म7 इस पOरयोजना को लागू करने के िलए रा/य सरकार; के साथ बातचीत करना • रा/य ; म7 ऊजा(cid:14) काय(cid:14) कुशलता का &चार &सार/जाग4कता पैदा करना • सभी पणधारक; के िलए काय(cid:14)शालाए/ं &िशBण काय(cid:14)Uम आयोिजत करना • एसडीए के िलए Bमता िनमा(cid:14)ण काय(cid:14)Uम संचािलत करना238 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] उपयु(cid:14)*त &(cid:17)त ािवत काय(cid:14)कलाप; के िलए कुल 140 करोड़ tपए क(cid:11) िनिध आव"य क ह।ै ऊजा(cid:14) संरBण अिधिनयम, 2001 के अंतग(cid:14)त 9दए गए अिधदशे के अनुसार रा/य ऊजा (cid:14) संरBण िनिध (एसईसीएफ) का गठन 24 रा/य ; म 7 पहले ही कर 9दया गया ह ै और ऊजा (cid:14) काय(cid:14)कुशलता संबंधी िविभTन &यास; के िलए एसईएफसी को &चालनरत करन े के उZ"े य स े 11वP योजना के दौरान सभी रा/य ; को िनिधयां जारी कर दी गई ह।- आं† &दशे , राज(cid:17)थ ान, छ(cid:29)त ीसगढ़, कना(cid:14)टक, हOरयाणा, पंजाब, केरल, िहमाचल &दशे और उड़ीसा क(cid:11) रा/य सरकार; ने भी एसईसीएफ म7 उतनी ही रािश का अंशदान कर 9दया ह ै और उTह 7 बीईई aारा दसू री 9क"त भी &दान कर दी गई ह।ै 12वP योजना म7 सभी रा/य ; म7 एसईसीएफ क(cid:11) (cid:17)थ ापना का &(cid:17)त ाव ह ै और • रा/य ; म7 एसईसीएफ के गठन तथा उसम 7 रा/य सरकार; aारा उतनी ही रािश का अंशदान करन े के िलए एडीए के साथ बातचीत करना। • ऊजा(cid:14) संरBण संबंधी िविभTन काय(cid:14)कलाप; के काया(cid:14)Tव यन और एसईसीएफ के अधीन िनिध के सदपु योग हते ु एसडीए के साथ समTव य (cid:17)थ ािपत करना। 12वP योजना म7 रा/य ऊजा(cid:14) संरBण िनिध म7 50 करोड़ tपए का अंशदान &(cid:17)त ािवत ह।ै एसडीए के सुदढ़ृ ीकरण और एसईसीएफ के िलए कुल 190 करोड़ tपए क(cid:11) िनिध आव"य क ह।ै 11112222....3333....4444 ममममााााननननकककक औऔऔऔरररर ललललबबेेबबेे aaaaललललगगगग ककककााााययययKK!!KK!! मममम ((((क)))): उउउउपपपप''''कक कक रररर औऔऔऔरररर उउउउपपपपककककररररणणणण : राRS ीय ऊजा (cid:14) ल बे Dलग काय(cid:14)Uम का शुभारंभ 18 मई, 2006 को 9कया गया। इस योजना का &मुख उZ"े य उपभो*त ा को ऊजा(cid:14) बचत के बारे म7 सूचना&द िवक_प उपल+ध कराना और इस &कार बेचे जा रह े संगत उप(cid:17)क र; / उपकरण; क(cid:11) लागत बचत संभावना6 के बारे म7 उTह 7 सूचना दने ा ह।ै 11वP योजना के दौरान इस योजना के अंतग(cid:14)त आरंभ म7 (cid:17)व ैि5छक लेबDलग <ेिणय; के तहत बIत स े उपकरण; को शािमल 9कया गया िजसम7 से 4 उपकरण/उप(cid:17)क र अथा(cid:14)त एसी, zा(cid:17)ट z(cid:11) रे9zजरेटर, टीएफएल और िवतरण Sांसफामर(cid:14) (200 केवीए तक) को अिनवाय (cid:14) लेबDलग काय(cid:14)Uम के िलए अिधसूिचत 9कया गया ह।ै ि(cid:17)पिलट एसी और zा(cid:17)ट z(cid:11) रे9zजरेटर के िलए ऊजा(cid:14) िनRप ादन मानक; को जनवरी, 2012 स े पुन: अ(cid:3)तन 9कया गया। 11वP योजना के दौरान मानक और लेबDलग (एस एsड एल) काय(cid:14)Uम काफ(cid:11) सफल रहा और इसन े 31 9दसंबर, 2011 तक 7766 मेगावाट अितOर*त Bमता बचत म7 योगदान 9दया। 11वP योजना म7 इस काय(cid:14)Uम के अंतग(cid:14)त 14 उपकरण; को शािमल करने तथा 12वP योजना म7 भी इस काय(cid:14)Uम के िव(cid:17)त ार क(cid:11) पOरक_प ना क(cid:11) गई ह।ै ऐसा अनुमान ह ै 9क 12वP योजना के अंत तक 27 उ(cid:29)प ाद; (सात अिनवाय (cid:14) और बीस (cid:17)व ैि5छक) को मानक और लेबDलग योजना के अंतग(cid:14)त शािमल 9कया जाएगा। पांच उ(cid:29)प ाद; पर संगत डटे ा &ाJत करने के िलए एक आधारभूत सवlBण भी 9कया जाएगा। उप(cid:17)क र; और उपकरण; के िलए एस एsड एल योजना के अंतग(cid:14)त 12वP पंचवषhय योजना म7 &(cid:17)त ािवत काय(cid:14)कलाप; म7 िनXन िलिखत शािमल ह - : • एस एsड एल काय(cid:14)Uम म7 कम से कम 13 नए उपकरण और उप(cid:17)क र; को शािमल करना। 12वP योजना म 7 कुछ इलेि*Sकल उपकरण; म7 वै कि_पक िव(cid:3)ुत हािन को कम करन े पर भी जोर 9दया जाएगा। • डाइरे*ट कूल रे9zजरेटर, कलर टी.वी. और हीटर के िलए अिनवाय(cid:14) लेबDलग काय(cid:14)Uम • सभी पणधारक; के बीच जाग4कता पैदा करना और उनका Bमता िनमा(cid:14)ण करना • एस एsड एल योजना म7 शािमल उपकरण; / उप(cid:17)क र; क(cid:11) परीBण जांच, लेबल स(cid:29)य ापन, बाजार &भाव मू_य ांकन आ9द करना। • स(cid:29)य ापन और िनगरानी के िलए (cid:17)व तंG एज7सी के 4प म7 काय(cid:14) करने हते ु रा/य aारा नािमत एज7िसय; को शािमल करना।¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 239 (खखखख) पपपपIIIIररररववववहहहहनननन (cid:26)(cid:26)(cid:26)(cid:26)(cid:27)(cid:27)ेे(cid:27)(cid:27)ेे ककककेेेे ििििललललएएएए ममममााााननननकककक औऔऔऔरररर ललललबबेेबबेे aaaaललललगगगग ((((एएएएसससस एएएएUUUUडड डड एएएएलललल)))) भारत म7 कुल 13.3 िमिलयन पैस7जर कार (2010-11) ह,- िजनम7 लगभग 9 एमटीओई क(cid:11) खपत क(cid:11) जाती ह।ै दशे म7 नई याGी कार; क(cid:11) औसत वाKषक िबU(cid:11) लगभग 1.1 िमिलयन ह।ै इस BेG के अंतग(cid:14)त िनXन िलिखत काय (cid:14) &(cid:17)त ािवत ह - : • वष(cid:14) 2015-16 से 2020-21 और 2020-21 से आगे िनगिमत औसत dधन बचत (सीएएफसी) के संदभ(cid:14) म7 dधन िमत(cid:15)य ियता शत (cid:144) लागू करना • याG ी कार; के िलए लेबDलग काय(cid:14)Uम शु4 करना • मानक और लेबDलग काय(cid:14)Uम को अंितम 4प दने े के िलए दो और तीन पिहया वाहन; तथा वािणि/यक वाहन; (Sक और बस) के िलए तकनीक(cid:11) अQय यन 12वP पंचवषhय योजना के अंत तक 4.3 एमटीओई ऊजा(cid:14) क(cid:11) बचत का लLय िनधा(cid:14)Oरत 9कया गया ह।ै उपयु(cid:14)*त &(cid:17)त ािवत योजना6 के आधार पर 12वP पंचवषhय योजना के दौरान मानक और लेबDलग कायU(cid:14) म के िलए 200 करोड़ tपए क(cid:11) िनिध आव"य कता क(cid:11) पOरक_प ना क(cid:11) गई ह।ै उपयु(cid:14)*त िनवेश के आधार पर वष (cid:14) 2016-17 म 7 एस एsड एल योजना से 10.4 िबिलयन यूिनट िव(cid:3)ुत ऊजा(cid:14) और 4.3 एमटीओई थम(cid:14)ल ऊजा(cid:14) क(cid:11) बचत होने का अनुमान ह।ै ffffDDDDooooeeeeVVsasaVVsasa ((((ग)))) ससससपपुुपपुु रररर एएएए((((फफफफििििशशशशएएएएंटंटंटंट इइइइ &&&&ोोोोFFFFाााामममम ((((एएएएससससईईईईईईईईपपपपीीीी)))) एसईई पी ऊजा(cid:14) काय(cid:14)कुशलता के िलए बाजार पOरवत(cid:14)न (एमटीईई) &यास का एक भाग ह,ै जो उTन त ऊजा(cid:14) काय (cid:14) कुशलता के िलए राRS ीय िमशन (एनएमईईई) के चार &यास; म7 से एक ह।ै एमटीईईई का &ाथिमक उZ"े य उ(cid:29)प ाद; को अिधक वहनीय (लागत अनुकूल) बनाने के िलए नवोTम ेषी उपाय; के जOरए ऊजा(cid:14) काय(cid:14) कुशल उपकरण; क(cid:11) ओर तेजी से tख पOरवKतत करना ह।ै इस काय(cid:14)Uम के अंतग(cid:14)त &मुख चुDनदा उपकरण; के िविनमा(cid:14)ता6 के साथ &(cid:29)य B 4प से जुड़कर कार(cid:14)वाई करन े का &(cid:17)त ाव 9कया गया ह।ै इसके िलए सामाTय त: ऐसे िविनमा(cid:14)ता6 के साथ समTव य (cid:17)थ ािपत करने क(cid:11) आव"य कता ह,ै िजनक(cid:11) इन उपकरण; के िलए बाजार म7 िह(cid:17)स ेदारी 70-90% ह।ै एसईईपी के अंतग(cid:14)त िविनमा(cid:14)ता6 को सुपर ए9फिशएटं अJल ांसेज (एसईए) के उ(cid:29)प ादन क(cid:11) बढ़ी Iई लागत के अिधकाशं भाग क(cid:11) &ितपूKत क(cid:11) जाएगी और उTह 7 इस बात के िलए भी &ो(cid:29)स ािहत 9कया जाएगा 9क वे न केवल इनका उ(cid:29)प ादन बि_क सामाTय उपभो*त ा6 को उिचत मू_य पर एसईए क(cid:11) िबU(cid:11) भी कर7। जैस-े जैसे इनक(cid:11) माGा बढ़ती जाएगी &ो(cid:29)स ाहन क(cid:11) आव"य कता तदनसु ार कम होने का अनुमान ह।ै इस ढंग से यह काय(cid:14)Uम भारत म7 वत(cid:14)मान म7 उपल+ध उपकरण; क(cid:11) तुलना म 7 अिधक काय(cid:14)कुशल उपकरण उपल+ ध करान े म7 सहायक होगा, इस &कार औसत खरीद क(cid:11) काय(cid:14)कुशलता और अंतरा(cid:14)RS ीय (cid:17)त र पर उपल+ध सवा(cid:14)िधक कुशल &ौ(cid:3)ोिगक(cid:11) के बीच का अंतर भी धीरे धीरे कम होगा। सुपर ए9फिशएटं अJल ांसेज (एसईए) बीईई के 5 िसतारा रे€टग वाले उपकरण; क(cid:11) तुलना म7 30-50% कम ऊजा (cid:14) क(cid:11) खपत होती ह।ै आरंभ म7 एसईए क(cid:11) लागत अिधक होगी जो बड़ े पैमान े पर उ(cid:29)प ादन सुिवधा6 क(cid:11) (cid:17)थ ापना स े धीरे धीरे कम क(cid:11) जा सकती ह,ै परंत ु बाजार म7 मांग क(cid:11) अिनि?तता के कारण िविनमा(cid:14)ता सुपर ए9फिशएटं अJल ांसेज के िलए उ(cid:29)प ादन लाइन; म7 पOरवत(cid:14)न हते ु आरंिभक िनवेश करने म7 सकं ोच महसूस कर रह े ह-। इन बाधा6 को नवोTम ेषी नीितगत ह(cid:17)त Bेप; aारा दरू करने क(cid:11) आव"य कता ह।ै¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 241 को शािमल करत े Iए 9कए गए ि(cid:17)थित िव"ल ेषण के िलए इस नमूना आधाOरत सवBl ण के दौरान शािमल 9कया गया। इस अQय यन म7 वाटर पंDपग के िलए अनुमानत: िव(cid:3)तु क(cid:11) संपूण(cid:14) खपत 1040 मेगा यूिनट था, िजसम 7 लगभग 208 मेगा यूिनट िव(cid:3)ुत बचत क(cid:11) संभावना थी। उपयु(cid:14)*त सवlBण के आधार पर 12वP योजना के दौरान एमयूडीएसएम योजना के िलए 25 करोड़ tपए क(cid:11) िनिध आव"य कता पOरकि_पत क(cid:11) गई ह ै *य ;9क इस योजना के अंतग(cid:14)त दशे म 7 एमयूडीएसएम के काया(cid:14)Tवयन हते ु एक सं(cid:17)थ ागत (cid:15)य व(cid:17)थ ा सृिजत क(cid:11) जाएगी। उपयु(cid:14)*त बजट जल िनगम (जल िनकाय;) क(cid:11) िनवेश आधाOरत लेखापरीBा और ऐसे कुछ चुDनदा यूएलबी म7 ऊजा(cid:14) संरBण उपाय; के काया(cid:14)Tव यन हते ु िनधा(cid:14)Oरत 9कया गया ह,ै िजनक(cid:11) डीपीआर 11वP पंचवषhय योजना म7 तैयार कर ली गई थी। 11112222....3333....6666 ककककृृृृििििषषषष ममममाााागगंंगगंं पपपप(cid:26)(cid:26)(cid:26)(cid:26) &&&&बबबबधधंंधधंं नननन ((((एएएएजजजजीीीीडडडडीीीीएएएएससससएएएएमममम)))) : दशे म7 कृिष BेG म7 लगभग 20% िव(cid:3)ुत क(cid:11) खपत क(cid:11) जाती ह ै जो सरकार के Nामीण िव(cid:3)तु ीकरण &यास; के फल(cid:17)व 4प बढ़ती जा रही ह।ै कृिष BेG म7 िव(cid:3)ुत क(cid:11) अिधकांश खपत पंDपग सेट; म7 क(cid:11) जाती ह ै जो सामाTय त: ऊजा (cid:14) काय(cid:14)कुशलता क(cid:11) दिृ n स े बेहतर नहP होत े ह।- चूं9क कृिष BेG के िलए टैOरफ सामाTय त: सबसे कम होते ह - और इसके िलए 9कसान; को अ(cid:29)य िधक छूट &दान क(cid:11) जाती है, पंDपग सेट क(cid:11) काय(cid:14)कुशलता म 7 सुधार के िलए कृिष उपभो*त ा6 कोई &ो(cid:29)स ाहन नहP 9दया जाता ह।ै हालां9क िव(cid:3)तु कंपिनयां इन <ेिणय; के उपभो*त ा6 को बेची गई ऊजा(cid:14) के &ित यूिनट पर 9कफायती मू_ य क(cid:11) वसूली नहP कर पा रही ह - और इसीिलए डीएसएम उपाय; के संदभ (cid:14) म7 इन <ेिणय; के उपभो*त ा6 को िवशेष 4प से लिBत करने क(cid:11) आव"य कता ह।ै कृिष संबंधी मांग पB &बंधन के अंतग(cid:14)त ऐसे बIत से अवसर उपल+ध कराए जाते ह-, िजनसे इस BेG म7 िव(cid:3)ुत क(cid:11) संपूण(cid:14) खपत को कम 9कया जा सकता है, भूिमगत जल िनRक ष(cid:14)ण क(cid:11) दBता म7 सुधार 9कया जा सकता ह ै और इस BेG के &ित सेवा बाQय ता का (cid:29)य ाग 9कए िबना रा/य ; पर सि+सडी के बोझ कम 9कया जा सकता ह।ै कृिष BेG म 7 ऊजा(cid:14) बचत क(cid:11) संभावना6, जो कुल ऊजा(cid:14) खपत के लगभग 20.75% (2007-08) के समतु_य होने का अनुमान ह,ै का लाभ उठाने के िलए 12वP योजना म7 9कए जाने वाले &(cid:17)त ािवत काय(cid:14)कलाप; के तहत संपूण(cid:14) योजना के दौरान (cid:17)थ ायी ऊजा (cid:14) काय(cid:14)कुशलता म7 तेजी लान े वाली &9Uया6 पर जोर 9दया जाएगा; &(cid:29)य ेक नए पंDपग सेट कने*श न के िलए पूरे दशे म7 (cid:15)य ापक (cid:17)त र पर अिनवाय(cid:14) िविनयम, ईईईपीएस के िलए िव(cid:29)त ीय सहायता, 11वP योजना म 7 तैयार क(cid:11) गई डीपीआर का काया(cid:14)Tव यन, िनगरानी और स(cid:29)य ापन, मौजूदा रा/य / केTe सरकार क(cid:11) योजना6 म7 (cid:17)ट ार रे€टग वाले पंDपग सेट; के &योग को सुकर बनाना, सीडीएम काय(cid:14)&णाली का &योग/सीईआर अज(cid:14)न, पOरणाम; के &चार &सार हते ु रणनीितक पहल करने पर जोर 9दया जाएगा। 11वP पंचवषhय योजना के दौरान कृिष डीएसएम योजना के &मुख &भाव; म7 लगभग 20,885 पंDपग सेट; को शािमल करते Iए 8 अलग रा/य ; म7 95 मेगा यूिनट क(cid:11) वाKषक ऊजा(cid:14) बचत संभावना का मू_य ांकन शािमल ह।ै महाराRS के सोलापुर BेG म7 2600 पंप सेट; को शािमल करते Iए पहली कृिष डीएसएम &ायोिगक पOरयोजना का काया(cid:14)Tव यन 9कया जा रहा ह।ै 11वP योजना के दौरान हािसल 9कए गए लLय ; के आधार पर 12वP योजना के अंत म7 2.7 लाख पंप सेट; क(cid:11) काय(cid:14)कुशलता उTन यन aारा लगभग 660 िमिलयन यूिनट िव(cid:3)ुत क(cid:11) खपत कम करने का &(cid:17)त ाव 9कया गया ह।ै इस लLय को पूरा करन े के िलए िनXन िलिखत &यास &(cid:17)त ािवत ह:- • एसडीए के जOरए नए कने*श न के िलए बीईई (cid:17)ट ार लबे लयु*त पंप सेट; का &योग अिनवाय(cid:14) करने के िलए िनयामक (cid:15)य व(cid:17)थ ा (लLय – 2.5 लाख पंप सेट)242 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] o ईईपीएस क(cid:11) (cid:17)थ ापना के िलए छोटे और मझोले 9कसान <ेणी को &दान क(cid:11) गई िव(cid:29)त ीय सहायता के साथ (cid:17)ट ार रेOटत ऊजा(cid:14) कुशल पंप सेट (ईईपीएस) के &योग को बढ़ावा दने े के िलए एसडीए/रा/य सरकार; को सहायता &दान करना। o कृिष पंDपग BेG के िलए उपल+ध रा/य /केTe सरकार क(cid:11) मौजूदा योजना6 म7 ईईपीएस के &योग को बढ़ावा दने ा • 11वP योजना के दौरान 8 रा/य ; म7 तैयार क(cid:11) गई डीपीआर के काया(cid:14)Tव यन और पOरयोजना ऊजा(cid:14) बचत करन े के िलए िनगरानी और स(cid:29)य ापन &ोटोकॉल लागू करने म7 सहायता &दान करना (लLय : 0.2 लाख पंप सेट)। • सभी पणधारक; को तकनीक(cid:11) सहायता और Bमता िवकास। • साव(cid:14)जिनक Nामीण पेयजल &णािलय; म7 वाटर पंDपग &णािलय; क(cid:11) ऊजा(cid:14) काय(cid:14)कुशलता म7 सुधार के िलए कुछ &दश(cid:14)न पOरयोजनाए ं (बजटीय &ावधान : 9.1 करोड़ tपए)। 12वP पंचवषhय योजना के अंत म7 यह पूवा(cid:14)नुमान ह ै 9क कृिष पंDपग सेट; के बाजारीय पOरद"ृ य म7 पOरवत(cid:14)न स े संगOठत एसएमई BेG म7 पंDपग सेट; के बड़ े िविनमा(cid:14)ता बीईई योजना6/काय(cid:14)Uम; के तहत शु4 9कए गए िविभTन &यास; के फल(cid:17)व 4प ऊजा(cid:14) क(cid:11) दिृ n से कुशल (cid:17)ट ार लेबल यु*त पंप सेट; का िविनमा(cid:14)ण शु4 कर दग7 े। इस योजना के अंतगत(cid:14) िड(cid:17)क ॉम, रा/य िनयामक आयोग;, रा/य aारा नािमत एजि7 सय;, रा/य सरकार;, पंप िविनमा(cid:14)ता6, ऊजा(cid:14) बचत कंपिनय;, 9कसान;/उपभो*त ा6 आ9द जैसे पणधारक; क(cid:11) (cid:15)य ापक सहभािगता सुिनि?त करन े का &यास 9कया गया ह।ै 11112222वववव,,,, ययययोोोोजजजजननननाााा ककककेेेे अअअअििंंििंं ततततमममम ववववषषषष (cid:15)(cid:15) (cid:15)(cid:15)अअअअथथथथाााातत(cid:15)(cid:15)तत(cid:15)(cid:15) 2222000011116666----11117777 मममम (cid:13)(cid:13) (cid:13)(cid:13) ििििववववIIIIततुुततुु कककक5555 अअअअननननममुुममुु ााााििििननननतततत बबबबचचचचतततत ललललगगगगभभभभगगगग 666666660000 ममममगगेेगगेे ाााा ययययििूूििूू ननननटटटट हहहह,,ैै,,ैै ििििजजजजससससककककेेेे ििििललललएएएए ललललगगगगभभभभगगगग 88880000 ककककररररोोोोड़ड़ड़ड़ ;;;;पपपपएएएए ककककेेेे ििििवववव(cid:20)(cid:20)(cid:20)(cid:20)तत तत ीीीीयययय बबबबजजजजटटटट कककक5555 आआआआवववव////यय यय ककककतततताााा हहहह।।ैै।।ैै 11112222....3333....7777 ललललघघघघ ुु ुु औऔऔऔरररर मममम(cid:2)(cid:2)(cid:2)(cid:2)यय यय मममम उउउउ(cid:25)(cid:25)(cid:25)(cid:25)मममम**** ((((एएएएससससएएएएममममईईईई)))) औऔऔऔरररर ननननााााििििममममतततत उउउउपपपपभभभभोोोोNNNNतत तत ाााा.... ककककेेेे ििििललललएएएए ऊऊऊऊजजजजाााा !! !!ककककााााययययकक!!कक!! ुुुुशशशशललललतततताााा :::: एसएमई BेG भारतीय अथ(cid:14)(cid:15)य व(cid:17)थ ा का एक मह(cid:29)व पूण(cid:14) घटक ह ै जो जीडीपी म7 8% का मह(cid:29)व पूण(cid:14) योगदान करता ह।ै िविनमाण(cid:14) आउटपुट म7 इसका योगदान 45% और कुल िनयात(cid:14) म 7 40% ह।ै इसी &कार यह BेG ऊजा(cid:14) बचत म7 भी मह(cid:29)व पूण(cid:14) भूिमका अदा करता ह,ै जो औ(cid:3)ोिगक BेG aारा कुल िव(cid:3)ुत खपत के लगभग 25% के समतु_य ह।ै दशे म7 1200 से अिधक एमएसएमई *ल (cid:17)ट र मौजूद ह,- िजसम7 लगभग 350-400 बड़ े िविनमात(cid:14) ा समूह शािमल ह,- िजनम7 स े लगभग 180 *ल (cid:17)ट र ऊजा(cid:14) संवेदी ह।- इस &कार एमएसएमई को ऊजा(cid:14) क(cid:11) दिृ n से कुशल (cid:17)व 5छ &ौ(cid:3)ोिग9कय; का अिधNहण करने और उTह 7 अपनाने, Bमता िनमा(cid:14)ण, िवशेष 4प से जलवायु पOरवत(cid:14)न के िलए राRS ीय काय(cid:14) योजना (एनएपीसीसी) के संदभ(cid:14) म7 िवशेष सहयोग &दान करने क(cid:11) आव"य कता ह।ै 25 उ5च ऊजा(cid:14) खपत वाले लघु और मQय म उ(cid:3)म; म7 ऊजा(cid:14) काय(cid:14)कुशलता उपाय; को तेजी से लागू करने के िलए बीईई ने रा/य aारा नािमत एज7िसय; के परामश(cid:14) से दशे म7 25 एसएमई *ल (cid:17) टर; म7 नैदािनक अQय यन शु4 9कया ह ै और *ल (cid:17)ट र िवशेष पर आधाOरत ऊजा(cid:14) काय(cid:14)कुशलता मैTय ुअल/बुकलेट तथा एसएमई म7 ऊजा(cid:14) संरBण को बढ़ावा दने े वाले द(cid:17)त ावेज तैयार 9कए ह।- 12वP योजना के दौरान 9कए जाने वाले &(cid:17)त ािवत काय(cid:14)कलाप/योजनाए ं िनXन ानुसार ह - : • डीपीआर के काया(cid:14)Tव यन को सुकर बनाते Iए ऊजा (cid:14) काय(cid:14)कुशलता और &ौ(cid:3)ोिगक(cid:11) उTन यन के िलए BेG आधाOरत पहल • अिखल भारतीय (cid:17)त र पर लिBत एसएमई BेG का ऊजा(cid:14) मानिचGण • एसएमई BेG म7 ऊजा(cid:14) कुशल &ौ(cid:3)ोिग9कय; को अपनाने के िलए नवोTम ेषी िव(cid:29)त ीय योजनाए ं शु4 करना। • तकनीक(cid:11) सहायता और Bमता िनमा(cid:14)ण। • एसएमई उ(cid:29)प ाद लेबDलग संवध(cid:14)न योजना यह पहल 11वP योजना के पOरणाम; और िनRक षV क(cid:11) पुनरावृिŽ पर आधाOरत होगी। इन 25 एसएमई *ल (cid:17)ट र; म7 ऊजा(cid:14) क(cid:11) कुल खपत 4468375 एमटीओई थी और अनुमािनत ऊजा(cid:14) बचत क(cid:11) संभावना लगभग 663771¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 243 एमटीओई थी जो कुल खपत का लगभग 15% ह।ै ऐसा Oरपोट(cid:14) 9कया गया ह ै 9क इन *ल (cid:17)ट र; म7 650 ऊजा (cid:14) काय(cid:14)कुशलता पOरयोजना6 से लगभग 14,300 एमटीओई क(cid:11) बचत क(cid:11) गई। एनएसएमई के ऊजा(cid:14) संवेदी BGे aारा वष (cid:14) 2016-17 म7 ऊजा(cid:14) क(cid:11) खपत 30.7 एमटीओई (अनुमािनत) होगी। बचत के िनधा(cid:14)Oरत लLय (131 मेगावाट) को &ाJत करने के िलए बीईई एसएमई म7 ऊजा(cid:14) काय(cid:14) कुशलता के िलए काय(cid:14)रत िविभTन एज7िसय;/ काय(cid:14)Uम; क(cid:11) सहायता से दशे म7 िविभTन *ल (cid:17)ट र; के लगभग 1500 एसएमई म7 &(cid:29) यB 4प से ह(cid:17)त Bेप कर लB &ाJत करन े के िलए &यासरत ह।- इसम7 ऊजा(cid:14) काय(cid:14)कुशल &ौ(cid:3)ोिग9कय; पर डीपीआर का काया(cid:14)नव ् यन और एसएमई के िलए (cid:17)थ ानीय/&ौ(cid:3)ोिगक(cid:11)य सेवा &दाता6 का िवकास, ब-कर/िव(cid:29)त ीय स(cid:17)ं थ ान; सिहत पणधारक; का Bमता िनमा(cid:14)ण और पOरणाम; के &चार &सार के िलए रणनीितक पहल शािमल होगी। इस रणनीित के अंतग(cid:14)त 11वP पंचवषhय योजना म7 चयिनत BेG; म7 व् यापक (cid:17)त र पर काया(cid:14)Tव यन सुिनि?त करने के िलए *ल (cid:17)ट र आधाOरत पहल को छोड़कर BेG आधाOरत पहल क(cid:11) जाएगी। 11112222....3333....8888 जजजजाााागगगगqqqqककककतततताााा ससससहहहहययययोोोोगगगग बबबबढ़ढ़ढ़ढ़ाााानननन ेे ेेककककेेेे ििििललललएएएए ससससववंंववंं धधधधनन!!नन!! ाााा####मम मम कककक ककककााााययययकक!!कक!! ललललाााापपपप – ऊऊऊऊजजजजाााा !! !!ससससररंंररंं (cid:26)(cid:26)(cid:26)(cid:26)णणणण अअअअििििधधधधििििननननययययमममम ऊजा(cid:14) संरBण अिधिनयम, 2001 के अंतग(cid:14)त सरकार और बीईई को पणधारक; के बीच ऊजा(cid:14) काय(cid:14)कुशलता और ऊजा(cid:14) संरBण के बारे म7 जाग4कता बढ़ाने के िलए कदम उठाने क(cid:11) अपेBा क(cid:11) गई ह।ै इस Uम म7 िनXन िलिखत काय(cid:14)कलाप; का काया(cid:14)Tव यन 9कया जा रहा ह ै : • ररररााााRRRRLL LL ीीीीयययय जजजजाााागगगगqqqqककककतततताााा अअअअििििभभभभययययाााानननन बीईई और एमओपी के सामाTय जाग4कता अिभयान के साथ-साथ मानक और लेबDलग काय(cid:14)Uम अिभयान का उZ"े य ऊजा(cid:14) बचत क(cid:11) आदत बनाने के लाभ और कुशलता के बारे म7 जनता के बीच जाग4कता फैलाना ह।ै सामाTय जाग4कता अिभयान के जOरए िव(cid:3)तु का औिच(cid:29)य पूण(cid:14) &योग सुिनि?त कर िव(cid:3)ुत क(cid:11) बचत के िलए लोग; को &ेOरत करने हते ु जाग4कता पैदा क(cid:11) जाएगी। यह अिभयान ऊजा(cid:14) सरं Bण &यास; के िलए अNणी अिभयान के 4प म 7 काय (cid:14) करेगा और इसके तहत हर घटं े क(cid:11) आव"य कता िवषय पर जोर 9दया जाएगा। लिBत bोता वग(cid:14) तक अिधकतम पIचं (cid:17)थ ािपत करन े के िलए एक म_ट ी मीिडया आउटरीच रणनीित तैयार क(cid:11) गई ह।ै योजना म7 मीिडया अथा(cid:14)त D&ट, टीवी, सेटलाइट, रेिडयो, िसनेमा, इंटरनेट, को शािमल करने से लोग; तक 96% पIचं बढ़ेगी। म_ट ी मीिडया अिभयान चरणबH ढंग से चलाया जा रहा ह:ै टीवी, Dपट मीिडया और रेिडयो योजना का काया(cid:14)लय पहले ही कर 9दया गया ह।ै टीवी/सेटलाइट म7 चैनल; का चयन टीएएम रे€टग पर आधाOरत ह ै िजसस े 9क 5+ ओटीएस पर 65%+ पIचं का लLय हािसल 9कया जा सके। D&ट मीिडया के िलए लोकि&य और अNणी अंNेजी, िहTद ी और BेGीय भाषा6 के समाचार पG; के साथ-साथ संपक(cid:14) पिGका6 को शािमल 9कया गया ह।ै रेिडयो अिभयान के िलए (cid:17)ट ेशन; का चयन इस ढंग से 9कया गया ह ै ता9क अिधकतम पIचं (cid:17)थ ािपत क(cid:11) जा सके। सभी चनै ल;, रेिडयो (cid:17)ट ेशन; और समाचार पG; का चयन डीएवीपी क(cid:11) नीित के अनसु ार 9कया गया ह।ै साथ ही िनगरानी और िनRप ादन मू_य ांकन चरण बनाए जाएगं े ता9क यह सुिनि?त 9कया जा सके 9क योजना अपन े िनधा(cid:14)Oरत लLय ; को &ाJत कर रही ह।ै िविभTन मीिडया Jल ेटफामV पर संसाधन; का आवंटन इस ढंग से 9कया गया ह ै ता9क टीवी और सेटलाइट को सवा(cid:14)िधक तथा इसके बाद D&ट और रेिडयो Jल ेटफामV को आवंटन 9कया जा सके। िसनमे ा और इंटरनेट के िलए भी योजना &(cid:17)त ािवत क(cid:11) गई ह।ै244 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] लिBत BेG; और सामाTय जनता के साथ-साथ (cid:17)क ूली ब5च ; के बीच ऊजा(cid:14) सरं Bण के &ित जाग4कता पैदा करन े के िलए 11वP योजना के दौरान बIत से काय(cid:14)कलाप 9कए गए, िजनम7 उ(cid:3)ोग;, भवन;, रेलवे के िलए राRS ीय ऊजा(cid:14) संरBण पुर(cid:17)क ार और (cid:17)क ूली ब5च ; के िलए ऊजा(cid:14) सरं Bण िवषय पर प7€टग &ितयोिगता शािमल ह।ै • ररररााााRRRRLL LL ीीीीयययय ऊऊऊऊजजजजाााा !! !!ससससररररंंंं (cid:26)(cid:26)(cid:26)(cid:26)णणणण पपपपररुुररुु ''''कक कक ाााारररर िव(cid:3)ुत मंGालय क(cid:11) राRS ीय ऊजा(cid:14) सरं Bण पुर(cid:17)क ार योजना म7 लगभग उ(cid:3)ोग जगत के 36 BेG, थम(cid:14)ल पावर (cid:17)ट ेशन, काया(cid:14)लयी भवन, होटल और अ(cid:17)प ताल, आंचिलक रेलवे, रा/य aारा नािमत एज7िसयां, नगर िनगम और बीईई के (cid:17)ट ार लेबलयु*त उपकरण; के िविनमा(cid:14)ता शािमल होते ह।- 1999 से 2011 क(cid:11) अविध के दौरान िपछले 13 वषV म7 इस पुर(cid:17)क ार योजना म7 शािमल यूिनट; ने सामूिहक 4प से 15,789 करोड़ tपए क(cid:11) बचत क(cid:11) ह ै और ऊजा(cid:14) काय(cid:14)कुशलता पOरयोजना6 म7 9कए गए िनवेश क(cid:11) 18 माह म7 भरपाई क(cid:11) गई। ऊजा(cid:14) के संदभ(cid:14) म7 ऊजा (cid:14) संरBण उपाय; म 7 शािमल यूिनट; aारा 17956 िमिलयन 9कलोवाट घंटा िव(cid:3)तु ऊजा(cid:14), 31 लाख 9कलो लीटर तेल, 124 लाख मीOSक टन कोयला और 22.44 िबिलयन *य ूिबक मीटर गैस क(cid:11) बचत क(cid:11) गई। &गामी औ(cid:3)ोिगक यूिनट; और अTय (cid:17)थ ापना6 ने ऊजा (cid:14) सरं Bण उपाय; क(cid:11) लागत &भावशीलता को पहले ही महससू कर िलया ह ै और वे राRS ीय ऊजा(cid:14) संरBण 9दवस पर इस 9दशा म7 9कए गए &यास; के िलए संबंिधत लोग;/संगठन; को सXम ािनत करते ह,- अTय हजार; यूिनट; और (cid:17)थ ापना6 को एक संदशे दते े ह,- िजTह ;ने अभी तक ऊजा(cid:14) संरBण के जOरए लागत &भावी संभावना6 का पूण(cid:14) लाभ &ाJत नहP 9कया ह।ै ऐसी आशा ह ै 9क राRS ीय ऊजा(cid:14) संरBण पुर(cid:17)क ार योजना राRS (cid:15)य ापी ऊजा(cid:14) सरं Bण अिभयान को बढ़ावा दने े और इसक(cid:11) 9दशा म7 िमलकर आगे बढ़न े के िलए अTय ऊजा(cid:14) उपभो*त ा6 को &ेOरत करेगी। 12वP पंचवषhय योजना के दौरान पहले से जारी सभी काय(cid:14)कलाप; को सुदढ़ृ करने और िनXन िलिखत िविशRट काय(cid:14)कलाप शु4 करने का &(cid:17)त ाव ह:ै • ऊजा(cid:14) संरBण पुर(cid:17)क ार योजना म7 &ितभागी यूिनट; के िलए डटे ाबेस का सृजन और इसका िव"ल ेषण • उ(cid:3)ोग जगत और िबD_डग BGे म7 सव(cid:14)<ेRठ &9Uया6 का अनुपालन और &चार &सार • ऊजा(cid:14) संरBण पर ईसी पुर(cid:17)क ार और प7€टग &ितयोिगता को जारी रखना • सामाTय जनता के िलए D&€टग, इले*S ािनक और अTय मीिडया के जOरए ऊज (cid:14) संरBण पर जाग4कता पैदा करना। 12व3 पंचवष4य योजना के अंितम वष(cid:25) 2016-17 म(cid:28) लगभग 3.42 िबिलयन यूिनट िव(cid:3)ुत ऊजा(cid:25) और 5 एमटीओई थम(cid:25)ल 7धन क(cid:17) बचत का अनुमान ह,ै िजसके िलए लगभग 100 करोड़ :पए के िव(cid:29)त ीय बजट क(cid:17) आव;य कता होगी। • ररररााााRRRRLL LL ीीीीयययय पपपपrr66rr66 टटटटगगगग &&&&ििििततततययययोोोोििििगगगगतततताााा जाग4कता बढ़ान े के िलए ब5च े मह(cid:29)व पूण(cid:14) लिBत समूह के साथ-साथ अिनवाय(cid:14) पणधारक भी ह;- इसिलए िव(cid:3)ुत मंGालय और बीईई ने ब5च ; के बीच जाग4कता पैदा करने के उZ"े य से यह पहल शु4 क(cid:11)। िव(cid:3)ुत मंGालय ने इस अिभयान के िविभTन काय(cid:14)कलाप; म7 से एक &मुख काय(cid:14)कलाप के 4प म7 (cid:17)क ूल (cid:17)त र, रा/य और राRS ीय (cid:17)त र पर कBा 4, 5 और 6 के ब5च ; के िलए प7€टग &ितयोिगता, छठवP से आठवP कBा के िव(cid:3)ाKथय; के िलए सक ् ूल और रा/य (cid:17)त र पर Dनबध लेखन &ितयोिगता, िजला और रा/य (cid:17)त र पर नौवP स े 12वP कBा के िव(cid:3)ाKथय; के िलए¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 245 वाद िववाद &ितयोिगता शु4 क(cid:11) ह,ै जो न केवल िव(cid:3)ाKथय; को ऊजा(cid:14) संरBण क(cid:11) आव"य कता के बारे म7 जाग4क बनाया बि_क उनके माता िपता को भी इस &योजन म7 शािमल होने और िशBा &ाJ त करने का अवसर िमलेगा। यह एक ऐसा उपाय ह ै जो घरेलू BेG; म7 जाग4कता पैदा करन े म7 सहायक िसH हो सकता ह।ै वष (cid:14) 2011 म7 प7€टग &ितयोिगता म7 लगभग 58,855 (cid:17)क ूल; और 2072285 िव(cid:3)ाKथय; न े भाग िलया। 11112222....3333....9999 &&&&ााााQQQQतत तत ////अअअअपपपपििेेििेे (cid:26)(cid:26)(cid:26)(cid:26)तततत पपपपIIIIररररणणणणाााामममम मंGालय ने 11वP पंचवषhय योजना के अंत तक 5% ऊजा(cid:14) खपत कम करने का लLय िनधा(cid:14)Oरत 9कया गया ह।ै मू_य ांकन के अनुसार ऊजा(cid:14) बचत सभं ावना 20,000 मगे ावाट ह ै और 11वP योजना के िलए लगभग 10,000 मेगावाट क(cid:11) बचत करने क(cid:11) योजना बनाई गई है। इस BेG म7 &मुख उपलि+धयां िनXन ानसु ार ह - : (cid:3) 12वP जांच तक 9,368 अिध&मािणत ऊजा(cid:14) &बंधक िजसम7 से 6791 अिध&मािणत ऊजा(cid:14) लेखापरीBक ह।- (cid:3) ऊजा(cid:14) &बंधक; और लेखापरीBक; के िलए 13 राRS ीय अिध&माणन परीBाए ं सफलतापूव(cid:14)क आयोिजत क(cid:11) गd। (cid:3) ऊजा(cid:14) (cid:15)य वसाियय; क(cid:11) सहायता के िलए 4 माग(cid:14)दKशकाए ं भी तैयार क(cid:11) गd। (cid:3) 4 अTय ोTय 9Uया(cid:29)म क वेबसाइट7 तैयार क(cid:11) गd। (cid:3) 32 रा/य सरकार; और संघ रा/य BेG; म7 अपने रा/य म7 ईसी अिधिनयम के काया(cid:14)Tव यन हते ु रा/य aारा नािमत एज7िसय; को अिधसिू चत 9कया ह।ै (cid:3) मानक और लेबDलग योजना के पOरणाम(cid:17)व 4प वष(cid:14) 2011-12 के दौरान 4611 मेगा यूिनट िव(cid:3)तु क(cid:11) बचत क(cid:11) गई जो 2565 मेगावाट िव(cid:3)ुत उ(cid:29)प ादन Bमता के समतु_य ह।ै (cid:3) राRS ीय ऊजा(cid:14) संरBण पुर(cid:17)क ार कायU(cid:14) म म7 644 &ितभागी यूिनट; aारा अलग-अलग क(cid:11) गई बचत के आधार पर अनुमािनत (cid:29)य ा/य Bमता 504 मेगावाट के समतु_य ह।ै (cid:3) 11वP योजना के दौरान बीईई के काय(cid:14)Uम;/योजना6 से संबंिधत बचाई गई ऊजा(cid:14) के संदभ(cid:14) म7 उपिल+ धयां 10,836 मेगावाट ह।- 11112222....4444 आआआआपपपप00ूू00ूू तततत पपपप(cid:26)(cid:26)(cid:26)(cid:26) &&&&बबबबधधंंधधंं नननन 11112222....4444....1111 दशे म7 थम(cid:14)ल यूिनट; क(cid:11) यूिनट Bमता 600 मेगावाट तक ह।ै 660/800 मेगावाट Bमता वाली बIत सी सुपर 9UOटकल यूिनट7 िनमाण(cid:14) ाधीन ह।- आरंभ म7 सुपर 9UOटकल यूिनट; का िडजाइन 247 9कलोNाम &ित वग (cid:14) स7टीमीटर, 537/50C के साथ तैयार 9कया गया था। अब 272 9कलोNाम &ित वग(cid:14) सट7 ीमीटर, 565/5930C,,,, के मानदडं ; के साथ पOरक_प ना क(cid:11) जा रही ह।ै उ5च वाRप मानदडं ; के साथ पOरकि_पत सुपर 9UOटकल यूिनट; क(cid:11) काय(cid:14)कुशलता वत(cid:14)मान म 7 उपल+ध 500 मेगावाट यूिनट; क(cid:11) कायक(cid:14) ुशलता क(cid:11) तुलना म7 लगभग 5% अिधक होगी। इसके पOरणाम(cid:17)व 4प कोयले क(cid:11) खपत भी उसी अनपु ात म7 कम होगी और Nीन हाउस गैस (जीएचजी) का उ(cid:29)स ज(cid:14)न भी कम होगा। 12वP योजना म7 अिधकांश कोयला आधाOरत Bमता अिभवृिH सुपर 9UOटकल यूिनट; स े संभािवत ह।ै 13वP योजना के दौरान थम(cid:14)ल Bमता अिभवृिH केवल सुपर 9UOटकल यूिनट; से ही क(cid:11) जाएगी। 100 मेगावाट अथवा उसस े कम Bमता क(cid:11) बIत सी छोटी यूिनट7 &चालनरत ह।- इन यूिनट; म 7 स े / यादातर का औसत पीएलएफ बIत ही कम, यहां तक 9क 50% स े भी कम ह।ै ये यूिनट7 नॉन-रीहीट टाइप क(cid:11) ह,- िजनक(cid:11) िडजाइन काय(cid:14)कुशलता बIत ही कम ह।ै आगामी 10 वषV म7 ऐसी यूिनट; को चरणबH ढंग से बंद करने क(cid:11) योजना ह।ै246 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] 11112222....4444....2222 दशे म7 थम(cid:14)ल पावर (cid:17)ट ेशन; का &चालन उ5च अनुषंगी िव(cid:3)ुत खपत और िaतीयक dधन तेल क(cid:11) खपत पर 9कया जा रहा ह।ै कमजोर &चालन और रख-रखाव &9Uया6 के साथ इन घटक; के पOरणाम(cid:17)व 4प (cid:17)ट ेशन; क(cid:11) कायक(cid:14) ुशलता कमजोर ह।ै थम(cid:14)ल पावर (cid:17)ट ेशन; पर सीईए aारा 9कए गए मानिचGण अQय यन से पता चला ह ै 9क पावर (cid:17)ट ेशन; को कमजोर कंडश7 र वै*य ूम, एचपी हीटर; क(cid:11) अनुपल+ध ता, डीएम जल क(cid:11) अ(cid:29)य िधक खपत, +व ॉयलर म7 हवा का Oरसाव dधन गैस का अिधक तापमान और बIत से अTय कारण; से अ(cid:29)य िधक नुकसान हो रहा ह।ै अिधकांश (cid:17)ट ेशन; को सब-ऑिJटमल &चालन के कारण अ(cid:29)य िधक िव(cid:29)त ीय हािन हो रही ह ै और इसके पOरणाम(cid:17)व 4प कोयला तथा तेल क(cid:11) खपत बIत अिधक ह।ै 11112222....4444....3333 उ5च तर उ(cid:29)प ादन, ऊRम ा दर म7 सुधार और बIत से थम(cid:14)ल पावर (cid:17)ट ेशन; म7 िविशष् ट dधन तेल तथा कोयले क(cid:11) खपत कम करने के संदभ(cid:14) म7 लाभ अKजत 9कए गए ह।- जहां सीईए aारा मानिचGण Oरपोट(cid:14) म7 दी गई िसफाOरश; को काया(cid:14)िTवत 9कया गया ह।ै 11112222....4444....4444 िसफाOरश; के काया(cid:14)Tव यन क(cid:11) िनयिमत आधार पर िनगरानी क(cid:11) जा रही ह।ै सीईए ने ‘’थम(cid:14)ल पावर (cid:17)ट ेशन; म7 ऊजा(cid:14) लेखापरीBा &कोRठ क(cid:11) (cid:17)थ ापना के िलए 9दशािनदशl ’’ भी तैयार 9कए ह,- िजसस े 9क थम(cid:14)ल पावर (cid:17)ट ेशन; को अपने (cid:17)त र पर ही ऊजा(cid:14) लेखापरीBा संचािलत करने के िलए &ो(cid:29)स ािहत 9कया जा सके। ऊजा (cid:14) सरं Bण अिधिनयम, 2001 म 7 यह अिनवाय(cid:14) &ावधान 9कया गया ह ै 9क पावर (cid:17)ट ेशन; क(cid:11) ऊजा(cid:14) लेखापरीBा अिध&मािणत ऊजा(cid:14) लेखापरीBक; aारा करवाई जाए। &चालना(cid:29)म क दBता म 7 सुधार के िलए ऊजा(cid:14) लेखापरीBा और िसफाOरश; के काया(cid:14)Tव यन को िनयिमत काय(cid:14)कलाप; म7 शािमल 9कया जाए और तदनसु ार आव"य क िव(cid:29)त ीय (cid:15)य व(cid:17)थ ाए ं क(cid:11) जाए।ं भारतीय िव(cid:3)तु &णाली म7 पारेषण और िवतरण (टी एsड डी) संबंधी हािनयां िव"व म7 सवा(cid:14)िधक ह।- वत(cid:14)मान म 7 अिखल भारतीय (cid:17)त र पर टी एsड डी हािनयां लगभग 27% ह,- िजसम7 स े अिधकांश भाग गैर तकनीक(cid:11) हािनय; और चोरी का ह।ै गैर तकनीक(cid:11) हािनय; को थोड़ी सी अितOर*त लागत पर बेहतर &बंधन स े कम 9कया जा सकता ह।ै अितOर*त कैिप(cid:17)ट र लगाकर, उपयु*त आकार वाल े Sां(cid:17)फ ाम(cid:14)र; क(cid:11) (cid:17)थ ापना, एमोरफस कोर Sां(cid:17)फ ाम(cid:14)र; क(cid:11) (cid:17)थ ापना, पारेषण और िवतरण लाइन; का िव(cid:17)त ार और सुदढ़ृ ीकरण तथा लो वो_ट ेज लाइन; क(cid:11) लंबाई कम करके तकनीक(cid:11) हािनय; को कम करने के िलए योजनाए ं तैयार क(cid:11) गई ह।- पारेषण और िवतरण हािनय; को कम करन े और िव(cid:3)ुत &णािलय; क(cid:11) ऊजा (cid:14) लेखापरीBा के िलए जारी 9दशािनदशl ; के आधार पर िव(cid:3)ुत कंपिनय; को टी एsड डी हािनय; को कम करने के िलए &ो(cid:29)स ािहत 9कया गया ह।ै इसके िलए कृिष BेG का लोड अलग कर और &योग के समय (टीओयू) अलग-अलग टैOरफ आ9द &9Uया लागू कर कंJय ूटरीकृत &णाली लोड &बंधन के संदभ (cid:14) म7 योजना6 का काया(cid:14)Tव यन 9कया जाए। टीओयू टैOरफ इस ढंग स े िडजाइन 9कया जाए 9क यह िनXन दर के िलए &ो(cid:29)स ाहन का काय (cid:14) करे और यह उपभो*त ा6 को ऑफ पीक घंट; के दौरान ऊजा(cid:14) के अिधक उपयोग के िलए &ो(cid:29)स ािहत करे। इसके अलावा पीक घंट; के दौरान ऊजा(cid:14) के अिधक &योग को हतो(cid:29)स ािहत करने के िलए इसक(cid:11) दर7 अपेBाकृत अिधक िनधा(cid:14)Oरत क(cid:11) जाए।ं पीक घंट; के दौरान &णाली के लोड को अलग और Tय ूनतम करन े के उZ"े य से लोड क(cid:11) BेGीय (cid:17)ट ेग€रग क(cid:11) जानी चािहए। इन &यास; का तेजी से अनुपालन 9कया जाना चािहए ता9क िव(cid:3)ुत क(cid:11) चोरी और अनाव"य क दtु पयोग को रोका जा सके। उ5च वो_ट ेज िवतरण &णाली (एचवीडीएस) म7 टी एsड डी हािनय; को कम करने क(cid:11) अपार संभावनाए ं ह - अत: इसे &ो(cid:29)स ािहत 9कया जाना चािहए। 11112222....4444....5555 भारतीय िव(cid:3)तु &णाली लगभग 100 वष(cid:14) पुरानी ह।ै नवीनतम &ौ(cid:3)ोिगक(cid:11) िवकास के साथ उ(cid:29)प ादन और अंितम उपभो*त ा को (cid:17)व ीकाय(cid:14) पया(cid:14)वरणीय सीमा6 के भीतर सवा(cid:14)िधक &भावी और कुशल ढंग स े िव(cid:3)तु क(cid:11) आपूKत &णाली म7 सुधार के क(cid:11) अपार सभं ावनाए ं ह।- सकु(cid:14)ले€टग / &ेसराइ/ड {लूडाइ/ड बेड कं+श न (सीएफबीसी¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 247 और पीएफबीसी), कोयले क(cid:11) धुलाई/लाभ &दान करना, सब (cid:17)ट ेशन; का कंJय ूटर आधाOरत उTन यन, सुपर 9UOटकल प_व रा/ड {यूल यूिनट और इंटीNेटेड गैसी9फकेशन कंबाइंड साइकल (आईजीसीसी) Jल ांट नवीनतम &ौ(cid:3)ोिग9कय; के कुछ उदाहरण ह।- 11112222....5555 11111111वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे अअअअधधधधीीीीनननन उउउउपपपपललललििििXXXXधधधध 11वP योजना के दौरान िव(cid:3)ुत मंGालय और ऊजा (cid:14) कायक(cid:14) ुशलता +य ूरो (बीईई) न े भारत म7 ऊजा (cid:14) काय(cid:14)कुशलता को बढ़ावा दने े के िलए बIत सी योजनाए ं लागू क(cid:11) थP। बीईई क(cid:11) योजना6 म7 मानक और लेबDलग (एस एsड एल), ऊजा(cid:14) संरBण िबD_डग कोड (ईसीबीसी) और मौजूदा िबD_डग; म7 ऊजा(cid:14) काय(cid:14)कुशलता, बचत ल-प योजना (बीएलवाई), एसडीए का सदु ढ़ृ ीकरण, लघु और मQय म उ(cid:3)म; (एसएमई) म7 ऊजा(cid:14) काय(cid:14)कुशलता, कृिष और नगर िनगम मांग पB &बंधन (डीएसएम) और रा/य ऊजा (cid:14) संरBण िनिध (एसईसीएफ) म7 योगदान शािमल ह।- िव(cid:3)ुत मंGालय (एमओपी) क(cid:11) योजना6 म7 ऊजा (cid:14) संरBण जाग4कता, ऊजा (cid:14) सरं Bण परु (cid:17)क ार और (cid:17)क ूली ब5च ; के िलए ऊजा(cid:14) संरBण पर प7€टग &ितयोिगता तथा उTन त ऊजा(cid:14) दBता के िलए राRS ीय िमशन (एनएमईईई) शािमल ह।- 11वP पंचवषhय योजना (2007-12) म7 यह &(cid:17)त ाव 9कया गया था 9क 11वP योजना के आरंभ म 7 अनुमािनत ऊजा(cid:14) खपत म7 5% क(cid:11) बचत का लLय हािसल 9कया जाएगा। इन योजना6 के पOरणाम उ(cid:29)स ाहजनक रह;े बीईई और एमओपी क(cid:11) िविभTन योजना6 के अंतग(cid:14)त बIत स े काय(cid:14)कलाप; के पOरणाम(cid:17)व 4प 10,836 मेगावाट िव(cid:3)तु Bमता क(cid:11) बचत क(cid:11) गई (स(cid:29)य ािपत –––– 9दसंबर, 2011 तक)। 11112222....6666 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा मममम 66 66ककककंंंंपपपपननननीीीी आआआआधधधधााााIIIIररररतततत ममममाााागगंंगगंं पपपप(cid:26)(cid:26)(cid:26)(cid:26) &&&&बबबबधधंंधधंं नननन मांग पB &बंधन (डीएसएम) ऐसे उपाय; का चयन, आयोजना और काया(cid:14)Tव यन ह ै जो मांग को &भािवत करन े अथवा िव(cid:3)ुत मीटर के उपभो*त ा पB को &भािवत करने के उZ"े य से शु4 9कए जाते ह।- डीएसएम काय(cid:14)Uम स े िव(cid:3)ुत कंपिनय; क(cid:11) ऊजा(cid:14) लागत को घटाया जा सकता ह ै और दीघ(cid:14)काल म7 यह पारेषण और िवतरण &णािलय; के सुदढ़ृ ीकरण और उ(cid:29)प ादन Bमता िव(cid:17)त ार क(cid:11) और आव"य कता को कम कर सकता ह।ै िवतरण कंपिनय; (िड(cid:17)क ॉम) म7 डीएसएम &कोRठ क(cid:11) (cid:17)थ ापना और वहां कायर(cid:14) त काKमक; के Bमता िनमा(cid:14)ण हते ु तकनीक(cid:11) सहायता &दान करेगा ता9क उTह 7 12वP पंचवषhय योजना म7 डीएसएम क(cid:11) िनXन िलिखत रणनीितय; और योजना6 का काया(cid:14)Tव यन करने क(cid:11) दिृ n स े समथ(cid:14) बनाया जा सके : ((((IIII)))) ललललोोोोडडडड ससससवववव(cid:26)(cid:26)jj(cid:26)(cid:26)jj णणणण 9कसी िव(cid:3)ुत कंपनी aारा उपभो*त ा6 के खपत पैटन (cid:14) का अQय यन करन े के िलए सामाTय त: &"न ावली आधाOरत सवlBण &9Uया अपनाई जाती ह।ै “मानक लोड सवlBण तकनीक” िवकिसत करन े क(cid:11) आव"य कता ह,ै िजTह 7 िड(cid:17)क ॉम aारा अपनाया जाए। इसके अलावा यह भी पOरक_प ना क(cid:11) जाती ह ै 9क िड(cid:17) कॉम को कंपनी/शहर (cid:17)त र पर लोड &ोफाइल तैयार करना चािहए, िजसे आविधक आधार पर िवतरण कंपिनय; और बीईई क(cid:11) डीएसएम वेबसाइट (http://www.bee-dsm.in) पर अपलोड 9कया जाना चािहए, िजसका डीएसएम योजनाए ं तैयार करने और आगामी िव"ल ेषण म7 सदपु योग 9कया जा सकता ह।ै ((((IIIIIIII)))) ललललोोोोडडडड ररररणणणणननननीीीीििििततततययययाााा ंं ंं उपभो*त ा लोड &ोफाइल संशोिधत करने और इस &कार उनक(cid:11) पीक मांग घटाने के िलए िव(cid:3)ुत कंपिनय; aारा लोड रणनीितय; को अपनाया जाए। िड(cid:17)क ॉम/िव(cid:3)ुत कंपिनय; aारा िनXन िलिखत लोड &बंधन रणनीितय; का &दश(cid:14)न 9कया जाए :248 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] * मांग tझान मांग tझान एक ऐसा &यास ह ै िजसके तहत पीक घंट; के दौरान अथवा िवतरण कंपिनय; aारा अनरु ोध 9कए जान े पर उपभो*त ा6 aारा (cid:17)व ैि5छक 4प से लोड कम करके पीक घंट; के दौरान अितOर*त Bमता सृिजत क(cid:11) जाती ह।ै लोड कम करने का लLय ऊजा(cid:14) काय(cid:14)कुशलता aारा अथवा लोड िशD{टग उपाय; से लोड घटाकर &ाJत 9कया जा सकता ह।ै * लोड &बंधन काय(cid:14)Uम • गितशील/वा(cid:17)त िवक समय आधाOरत मू_य िनधा(cid:14)रण: आपूKत और मांग क(cid:11) वा(cid:17)त िवक समय आधाOरत &णाली के आधार पर • &योग के समय पर आधाOरत दर7 : उपभो*त ा6 को 9दन के अलग अलग समय पर िव(cid:3)ुत के &योग के िलए अलग अलग दर7 &(cid:17)त ािवत क(cid:11) जाती ह।- • (cid:17)व चािलत/(cid:17)म ाट(cid:14) मीट€रग : गितशील/वा(cid:17)त िवक समय आधाOरत मू_य िनधा(cid:14)रण अथवा &योग के समय के आधार पर दर ढांचा और तदनुसार िबDलग &9Uया का काया(cid:14)Tव यन • वेब आधाOरत/सचं ार &णाली : यह एक ऐसा उपकरण ह ै िजसका &योग उपयु(cid:14)*त के साथ साथ उपभो*त ा को वा(cid:17)त िवक समय आधार पर मौजूदा मांग, आपूKत, मू_य ; और उसके िलए &ो(cid:29)स ाहन तथा ऐसे िवक_प ; के बारे म7 सूिचत करने के िलए 9कया जाता ह,ै िजनका &योग उपभो*त ा मांग &बंधन के िलए करता ह।ै ((((IIIIIIIIIIII)))) &&&&ददददशशशशनन!!नन!! अअअअ(cid:2)(cid:2)(cid:2)(cid:2)यय यय ययययनननन &(cid:29)य B (cid:17)थ ापना काय(cid:14)Uम जो ऊजा(cid:14) काय(cid:14)कुशलता उपाय; के 9कसी पैकेज के िलए िडजाइन, िव(cid:29)त पोषण, (cid:17)थ ापना संबंधी सभी सेवाए ं &दान करता ह।ै ((((IIIIVVVV)))) उउउउCCCCनन नन तततत ममममीीीीटटटटrrrrररररगगगग उTन त मीटर; म7 ऑनलाइन संचार, पOरशुH मापन, (cid:17)थ ानीय योrय ता, लोड कने*ट –––– िड(cid:17)क ने*ट सुिवधा और उपभो*त ा क(cid:11) सुिवधा के अनुकूल िड(cid:17)J ल े यूिनट जैसी िवशेषताए ं होती ह।- इस &ौ(cid:3)ोिगक(cid:11) को अपनाने से िवशेष 4प से मांग tझान संबंधी काय(cid:14)कलाप; के िलए मांग पB &बंधन के काया(cid:14)Tव यन म7 िवतरण कंपिनय; को सहायता िमलेगी। ((((VVVV)))) डडडडीीीीएएएएससससएएएएमममम गगगगििििततततििििववववििििधधधधयययय**** ककककेेेे ििििललललएएएए ििििवववव####तत तत ीीीीयययय ffffयय यय वववव''''थथ थथ ाााा डीएसएम उपाय; और ऊजा(cid:14) काय(cid:14)कुशलता का रणनीितक मह(cid:29)व भारतीय िव(cid:3)ुत कंपिनय; के िव(cid:29)त ीय नकदी &वाह म7 सुधार के िलए उनक(cid:11) Bमता पर िनभर(cid:14) करता ह।ै इसके अलावा डीएसएम तथा मांग tझान (डीआर) संबंधी काय(cid:14)कलाप; का सदपु योग पीक घंट; के दौरान िव(cid:3)तु क(cid:11) मांग को कम करने के िलए 9कया जाता ह।ै दसू रे श+द ; म7 यह कहा जा सकता ह ै 9क यह पीक घंट; के दौरान मांग को कम करके उ(cid:29)प ादन, पारेषण और िवतरण अवसंरचना के िव(cid:17)त ार पर 9कए जाने वाले (cid:15)य य को कम करेगा। इस &कार यह कहा जा सकता ह ै 9क इसस े िनिधयां मु*त ह;गी और उनका सदपु योग पीक मांग को पूरा करने के िलए अTय था 9कया जा सकेगा। राRS ीय (cid:17)त र पर लोड वृिH क(cid:11) समीBा डीएसएम के साथ और उसके िबना क(cid:11) जानी चािहए और कम पीक वृिH के कारण मु*त Iई िनिधय; का उपयोग डीएसएम/डीआर संबंधी काय(cid:14)कलाप; के िलए 9कया जाना चािहए। दसू रे श+द ; म7 यह कहा जा सकता ह ै 9क डीएसएम/डीआर का लLय पीक मांग को कम करना (अथा(cid:14)त 0.5% स े 1%) होना चािहए और इसके कारण अवसंरचना कायV म7 क(cid:11) गई बचत का इ(cid:17)त ेमाल डीएसएम/डीआर काय(cid:14)कलाप; के िलए 9कया जाना चािहए। 11112222वववव,,,, पपपपचचंंचचंं ववववषषषषLLLLयययय ययययोोोोजजजजननननाााा ककककेेेे अअअअततंंततंं गगगगतत(cid:15)(cid:15)तत(cid:15)(cid:15) ििििडडडडGGGGकक कक ॉॉॉॉमममम NNNNाााारररराााा GGGGथथ थथ ााााििििपपपपतततत डडडडीीीीएएएएससससएएएएमममम ससससललेेललेे कककक5555 (cid:17)(cid:17)(cid:17)(cid:17)ममममतततताााा ििििननननममममााााणण(cid:15)(cid:15)णण(cid:15)(cid:15) ककककेेेे ििििललललएएएए ततततककककननननीीीीकककक5555 ससससहहहहााााययययतततताााा उउउउपपपपललललOOOOधध धध ककककरररराााानननन ेे ेेहहहहततततेेेे ुु ुुििििननननििििधधधधयययय7777 कककक5555 ककककुुुुलललल आआआआवववव////यय यय ककककतततताााा 333300000000 ककककररररोोोोड़ड़ड़ड़ ;;;;पपपपएएएए हहहह।।ैै।।ैै¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 249 11112222....7777 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा मममम 66 66ऊऊऊऊजजजजाााा !! !!ससससररंंररंं (cid:26)(cid:26)(cid:26)(cid:26)णणणण ररररणणणणननननीीीीिििितततत 11वP पंचवषhय योजना के दौरान अपनाई गई रणनीितय; के उ(cid:29)स ाहजनक पOरणाम &ाJत होने लगे ह।- अपेिBत ऊजा(cid:14) बचत के लLय ; को हािसल करने के िलए ऊजा(cid:14) कायक(cid:14) ुशलता उपाय; के काया(cid:14)Tव यन क(cid:11) &9Uया म7 तेजी लान े हते ु कायक(cid:14) लाप; के और सुदढ़ृ ीकरण के साथ साथ मौजूदा योजना6 को आगे जारी रखना िनतांत आव"य क ह।ै इसके अलावा (cid:15)य ापक पैमाने पर ऊजा(cid:14) क(cid:11) बचत औ(cid:3)ोिगक, वािणि/यक, आवासीय और कृिष BेG; म7 योजना6 के सुदढ़ृ ीकरण के साथ साथ नए BेG; म7 इनके िव(cid:17)त ार के जOरए क(cid:11) जा सकती ह।ै 12वP पंचवषhय योजना के अंत म7 अथा(cid:14)त वष(cid:14) 2016-17 के दौरान मांग पB म7 अनुमािनत ऊजा(cid:14) बचत क(cid:11) संभावना 44.85 िबिलयन यूिनट (बस बार पर 60.16 िबिलयन यिू नट के समतु_य ) ह ै और औ(cid:3)ोिगक BेG म7 21.3 एमटीओई के समतु_य अितOर*त ऊजा(cid:14) बचत (टीपीएस सिहत) और लघु तथा मQय म उ(cid:3)म;, पOरवहन BेG और ऊजा(cid:14) संरBण (ईसी) पुर(cid:17)क ार योजना आ9द का योगदान इसम7 शािमल ह।ै 12वP योजना के अंतग(cid:14)त िविभTन &(cid:17)त ािवत योजना6 के िलए ऊजा (cid:14) बचत (िव(cid:3)ुत और थम(cid:14)ल) के िनधा(cid:14)Oरत लLय नीचे 9दए गए ह - : 11112222....8888 जजजजललललववववाााायययय ुु ुुपपपपIIIIररररववववततततनन!!नन!! पपपपरररर ररररााााRRRRLL LL ीीीीयययय ककककाााायययय !! !!ययययोोोोजजजजननननाााा ((((एएएएननननएएएएपपपपीीीीससससीीीीससससीीीी)))) 30 जून, 2008 को &धानमGं ी aारा जारी क(cid:11) गई जलवायु पOरवत(cid:14)न पर राRS ीय काय(cid:14) योजना (एनएपीसीसी) म 7 बIसंjय क लोग; के जीवन (cid:17)त र म7 सुधार के िलए उ5च विृ H दर बनाए रखने और जलवायु पOरवत(cid:14)न के &भाव; स े उनक(cid:11) सुभ(cid:3)े ता कम करने क(cid:11) आव"य कता महसूस क(cid:11) गई। राRS ीय काय(cid:14) योजना म7 8 राRS ीय िमशन; क(cid:11) 4परेखा दी गई ह ै जो जलवाय ु पOरवत(cid:14)न के संदभ(cid:14) म7 मह(cid:29)व पूण(cid:14) लLय ; को &ाJत करन े के िलए बIआयामी, दीघ(cid:14)कािलक और एक(cid:11)कृत रणनीितय; का &ितिनिध(cid:29)व करते ह।- उTन त ऊजा(cid:14) काय(cid:14)कुशलता पर राRS ीय िमशन को एनएपीसीसी के लLय ; को &ाJत करन े के िलए मह(cid:29)व पूण(cid:14) िमशन; म7 से एक िमशन के 4प म 7 माना जाता ह।ै उTन त ऊजा(cid:14) काय(cid:14)कुशलता के िलए राRS ीय िमशन (एनएमईईई) के अंतग(cid:14)त भारत के िवकासा(cid:29)म क लLय ; को बढ़ावा दने े के साथ साथ जलवायु पOरवतन(cid:14) के &ितकूल &भाव; को समाJत करने म 7 सह-लाभ; क(cid:11) पहचान करने क(cid:11) अपेBा क(cid:11) गई ह।ै लागत &भावी ऊजा(cid:14) काय(cid:14)कुशलता और ऊजा(cid:14) संरBण उपाय इस संदभ(cid:14) म7 िवशेष 4प से मह(cid:29)व पूण(cid:14) ह।- इस िमशन का आधारभतू उZ"े य 4444ईईईई अअअअथथथथाााातत!!तत!! ऊऊऊऊजजजजाााा,,!!,,!! ककककााााययययकक!!कक!! ुुुुशशशशललललतततताााा,,,, ससससममममााााननननतततताााा औऔऔऔरररर पपपपययययाााावव!!वव!! ररररणणणण के उपयु*त िम<ण स े (cid:17)थ ायी वृिH सुिनि?त करना ह।ै एनएमईईई म(cid:16) उ9 नत ऊजा (cid:9) कायक(cid:9) ुशलता के िन; निल<खत चचचचाााारररर ूयास= का उ> लेख *कया गया है (11वीं योजना म(cid:16) एमओपी और बीईई Cारा चलाए जा रहे ऊजा(cid:9) कायक(cid:9) ुशलता कायब(cid:9) म= के अलावा) : i) िनं पादन, उपल<Hध और I यापार (पपपपीीीीएएएएटटटट&&&&); के जJरए ऊजा (cid:9) संवेद& उ(cid:26)ोग= के िलए अ*Cतीय बाजार आधाJरत I यवः था ii) उM पाद= को अिधक वहनीय बनाने के िलए नवो9म ेषी उपाय= के जJरए िनधाJ(cid:9) रत (cid:28)ेऽ= म(cid:16) ऊजा (cid:9) कN O(cid:25)P से कुशल उपकरण= कN ओर तेजी से (ख करना (ऊजा (cid:9) कायक(cid:9) ुशलता के िलए बाजार पJरवतन(cid:9) (एएएएममममटटटट&&&&ईईईईईईईई); iii) भावी ऊजा (cid:9) बचत को मूत (cid:9) Sप देते हुए सभी (cid:28)ेऽ= म(cid:16) मांग प(cid:28) ूबंधन काय(cid:9)बम= के िलए (cid:25)वM तीय सहायता ूदान करने वाले तंऽ का सजृ न (ऊजा (cid:9) कायक(cid:9) ुशलता (cid:25)वM त पोषण T लेटफाम (cid:9) (ईईईईईईईईएएएएफफफफपपपपीीीी) ऊजा (cid:9) कायक(cid:9) ुशलता को बढ़ावा देने के िलए राजकोषीय िलखत अथात(cid:9) ऊजा (cid:9)250 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] िव(cid:3)ुत मंGालय और बीईई को एनएमईइ(cid:14)ई के िलए काया(cid:14)Tव यन योजना तैयार करने का दािय(cid:29)व सkपा गया। एनएमईईई के अंतग(cid:14)त ऊजा(cid:14) काय(cid:14)कुशलता के िलए पहले से चलाए जा रह े काय(cid:14)Uम; के अलावा उTन त ऊजा(cid:14) काय(cid:14)कुशलता हते ु िनXन िलिखत चार नए &यास; क(cid:11) चचा (cid:14) क(cid:11) गई ह:ै (i) िनRप ादन, उपलि+ध और (cid:15)य ापार (ii) ऊजा(cid:14) काय(cid:14)कुशलता के िलए बाजार कायाक_प (एमटीईई) (iii) ऊजा(cid:14) क(cid:11) दिृ n से कुशल आKथक िवकास के िलए ढांचा (एफईईईडी) ((((iiii)))) ििििननननRRRRपप पप ााााददददनननन,,,, उउउउपपपपललललििििXXXXधधधध औऔऔऔरररर ffffयय यय ाााापपपपाााारररर ((((पपपपीीीीएएएएटटटटीीीी)))) :::: यह ऊजा(cid:14) बचत के अिध&माणन के जOरए ऊजा(cid:14) संवेदी बड़ े उ(cid:3)ोग; और सुिवधा6 म7 ऊजा(cid:14) काय(cid:14)कुशलता म7 सुधार हते ु लागत &भावशीलता बढ़ाने के िलए बाजार आधाOरत एक (cid:15)य व(cid:17)थ ा ह,ै िजसका (cid:15)य ापाOरक उपयोग 9कया जा सकता ह।ै भारत सरकार न े पीएटी योजना 30 माच(cid:14), 2012 को अिधसूिचत क(cid:11) और यह 1 अ&ैल, 2012 स े अिनवाय(cid:14) हो गई। पीएटी योजना के &थम चरण अथा(cid:14)त 2012-13 स े 2014-15 के दौरान ऊजा (cid:14) क(cid:11) दिृ n से 8 संवेदी BेG; जैस े थम(cid:14)ल पावर Jल ांट, ए_य ुिमिनयम, सीम7ट, *ल ोर-अलकली, फ“टलाइजर, लोहा और (cid:17)ट ील, प_प और पेपर तथा टे*स टाइल म7 नािमत उपभो*त ा6 को शािमल 9कया गया ह ै जो वाKषक आधार पर लगभग 165 िमिलयन टन तेल समतु_य ऊजा(cid:14) क(cid:11) खपत करते ह।- इस अविध म7 भाग लेने वाले उ(cid:3)ोग; के िलए &(cid:29)य B लाभ के 4प म7 6.686 िमिलयन टन तेल समतु_य ऊजा(cid:14) क(cid:11) बचत क(cid:11) गई, जो पीएटी के अंतग(cid:14)त 9कए गए मू_य ांकन के अनुसार इन 478 नािमत उपभो*त ा6 क(cid:11) Oरपोट(cid:14) क(cid:11) गई कुल ऊजा(cid:14) खपत का लगभग 4% ह।ै ((((iiiiiiii)))) ऊऊऊऊजजजजाााा !! !!ककककााााययययकक!!कक!! ुुुुशशशशललललतततताााा ककककेेेे ििििललललएएएए बबबबााााजजजजाााारररर ककककााााययययााााककककYYYYपप पप ((((एएएएममममटटटटीीीीईईईईईईईई)))) :::: एमटीईई ऊजा(cid:14) क(cid:11) दिृ n स े कुशल उपकरण; को वहनीय बनान े तथा उनके &ित लोग; म7 अिभtिच बढ़ान े के उZ"े य से (cid:17)व 5छ िवकास (cid:15)य व(cid:17)थ ा (सीडीएम) सिहत अंतरा(cid:14)RS ीय िव(cid:29)त ीय िलखत; के इ(cid:17)त ेमाल पर जोर दते े Iए उ(cid:29)पाद; को Nाहक; के अनुकूल बनाने के िलए नवोTम ेषी उपाय; के जOरए नािमत BेG; म7 ऊजा(cid:14) क(cid:11) दिृ n से कुशल उपकरण; क(cid:11) ओर तेजी से tख पOरवKतत करने के िलए चलाई गई एक योजना ह।ै सरकार 12वP पंचवषhय योजना म7 सुपर ए9फिशएटं इ9…पम7ट &ोNाम भी शु4 करन े वाली ह।ै इस पOरयोजना म 7 पहले उपकरण के 4प म7 सीDलग पंख; को शािमल 9कया गया ह।ै इस काय(cid:14)Uम के अंतग(cid:14)त पंख; के िविनमा(cid:14)ता6 को सुपर ए9फिशएटं पंख; का उ(cid:29) पादन और िबU(cid:11) करने के िलए &ो(cid:29)स ाहन दने े का &(cid:17)त ाव ह ै जो उपभो*त ा6 को छूट &ाJत मू_य पर बाजार म7 उपल+ध सवा(cid:14)िधक कुशल पंख; क(cid:11) तुलना म7 30-50% अिधक कुशल ह।- सभी पणधारक; जैसे पंख; के िविनमा(cid:14)ता, अनुसंधान और िवकास सं(cid:17)थ ान, &ौ(cid:3)ोिगक(cid:11) नवोTम ेषक और शैBिणक जगत तथा नीितगत िनकाय; के साथ कई दौर क(cid:11) िवचार िवमश(cid:14) बैठक7 आयोिजत क(cid:11) गd ता9क िविनदशl , &ो(cid:29)स ाहन ढांचा और मापन तथा स(cid:29)य ापन रणनीित और इस काय(cid:14)Uम क(cid:11) 4परेखा पर चचा(cid:14) क(cid:11) जा सके। सुपर ए9फिशएटं सीDलग पंख; के िनRप ादन िविनदशl ; को अंितम 4प द े 9दया गया ह ै तथा और काय(cid:14)Uम का िवकास अंितम चरण पर ह।ै ((((iiiiiiiiiiii)))) ऊऊऊऊजजजजाााा !! !!दददद(cid:26)(cid:26)(cid:26)(cid:26)तततताााा ििििवववव####तत तत पपपपोोोोषषषषणणणण QQQQलल लल टटेेटटेे फफफफाााामममम !! !!((((ईईईईईईईईएएएएफफफफपपपपीीीी)))) भारत म7 ऊजा(cid:14) काय(cid:14)कुशलता बाजार को बढ़ावा दने े के िलए यह पOरकि_पत 9कया गया है 9क नीितगत ह(cid:17)त Bेप, &दश(cid:14)न पOरयोजना6 के काया(cid:14)Tव यन, ऊजा(cid:14) सेवा कंपिनय; (ईएससीओ) को बढ़ावा दने े, (cid:17)थ ायी संिवदागत और¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 251 कानूनी द(cid:17)त ावेज; का िवकास एवं मानक(cid:11)करण तथा ऊजा(cid:14) काय(cid:14)कुशलता Jल ेटफाम(cid:14) के िलए बाजार तैयार करन े हते ु मह(cid:29)व पूण(cid:14) घटक के 4प म7 िव(cid:29)त पोषण (cid:15)य व(cid:17)थ ा लागू करन े क(cid:11) आव"य कता ह।ै सरकार भी ऊजा (cid:14) काय(cid:14)कुशलता पOरयोजना6 के मू_य ांकन हते ु साव(cid:14)जिनक BेG, ब-क; के साथ समझौता ‡ापन और ब-क अिधकाOरय; के &िशBण के जOरए िविभTन ऊजा(cid:14) काय(cid:14)कुशलता िव(cid:29)त पोषण J लेटफामV का िव(cid:17)त ार कर रही ह।ै बीईई aारा मैसस (cid:14) पीटीसी इंिडया िलिमटेड, मसै स(cid:14) एसआईडीबीआई, एचएसबीसी ब-क, टाटा कैिपटल और आईएफसीआई िलिमटेड के साथ ऊजा(cid:14) काय(cid:14)कुशलता पOरयोजना6 के िलए िव(cid:29)त पोषण को बढ़ावा दने े हते ु समझौता ‡ापन पर ह(cid:17)त ाBर 9कए गए ह।- 14 फरवरी, 2012 और 17 फरवरी, 2012 को Uमश: 9द_ल ी और मुXब ई म7 पीआरजीएफ और वीसीएफईई पर िव(cid:29)त ीय स(cid:17)ं थ ान; के सहयोग स े दो सXम ेलन आयोिजत 9कए गए, ता9क महाराRS और गुजरात के नािमत उपभो*त ा6 के िलए िव(cid:29)त ीय सहायता म7 तेजी लाई जा सके। ऊऊऊऊजजजजाााा !! !!ककककााााययययकक!!कक!! ुुुुशशशशललललतततताााा आआआआ0000थथथथकककक ििििववववककककाााासससस ((((एएएएफफफफईईईईईईईईईईईईडडडडीीीी)))) ककककाााा ढढढढााााचचंंचचंं ाााा सरकार भी िनRप ादन संिवदा6 के िलए गारंटी &दान कर, उ(cid:3)म पूंजी िनिध उपल+ध कराकर, ऊजा (cid:14) काय(cid:14)कुशलता पर साव(cid:14)जिनक BेG म7 नेतृ(cid:29)व बढ़ाकर और जीवन चU लागत िव"ल ेषण के आधार पर साव(cid:14)जिनक खरीद म7 ऊजा(cid:14) कायक(cid:14) ुशलता को बढ़ावा दते े Iए ऋणदाता6 को इस बात का पुन: आ"व ासन &दान करत े Iए राजकोषीय िलखत; के साथ ऊजा(cid:14) कायक(cid:14) ुशलता के िलए एक बाजार सृिजत करने का &यास कर रही ह।ै ऊजा (cid:14) काय(cid:14)कुशलता के िलए दो &कार क(cid:11) िनिधयां (cid:17)थ ािपत क(cid:11) जा रही ह।- इनम7 से एक ऊजा(cid:14) काय(cid:14)कुशलता के िलए आंिशक जोिखम गारंटी िनिध (पीआरजीएफईई) और दसू री ऊजा(cid:14) काय(cid:14)कुशलता के िलए उ(cid:3)म पूंजी िनिध (वीसीएफईई) ह।ै आआआआििंंििंं शशशशकककक जजजजोोोोििििखखखखमममम गगगगााााररररंंंंटटटटीीीी ििििननननििििधधधध (पपपपीीीीआआआआररररजजजजीीीीएएएएफफफफ) पीआरजीएफ एक जोिखम साझा करने िवषयक (cid:15)य व(cid:17)थ ा ह ै जो ऋणदाता को 9कसी चकू क(cid:11) ि(cid:17)थित म7 ऋण के एक भाग का पुनभु(cid:14)गतान सुिनि?त करते Iए गारंOटयां &दान कर ऋणकता(cid:14) के जोिखम भाग को &ित(cid:17)थ ािपत करती ह।ै पीआरजीएफ &ितभागी िव(cid:29)त ीय सं(cid:17)थ ान (पीएफआई) aारा 9दए गए ऋण के अिधकतम 50% भाग के िलए गारंटी &दान करती ह।ै ऊऊऊऊजजजजाााा !! !!ककककााााययययकक!!कक!! ुुुुशशशशललललतततताााा ककककेेेे ििििललललएएएए उउउउ(cid:25)(cid:25)(cid:25)(cid:25)मममम पपपपजजूंूंजजूंूं ीीीी ििििननननििििधधधध ((((ववववीीीीससससीीीीएएएएफफफफईईईईईईईई)))) उTन त ऊजा(cid:14) काय(cid:14)कुशलता के िलए राRS ीय िमशन के अंतग(cid:14)त भारत सरकार aारा यथा पOरकि_पत वीसीएफईई इन बाधा6 के समाधान और दशे म7 लंबे समय &तीिBत ऊजा(cid:14) काय(cid:14)कुशलता पOरयोजना6 को &ारंभ करन े म 7 काफ(cid:11) कारगर सािबत हो सकती ह।ै यह िनिध ऊजा(cid:14) काय(cid:14)कुशलता िनवेश को जोिखम पूंजी सहायता &दान करती ह।ै 11112222....9999 अअअअCCCCयय यय ससससभभंंभभंं ााााििििववववतततत (cid:26)(cid:26)(cid:26)(cid:26)(cid:27)(cid:27)ेे(cid:27)(cid:27)ेे वीईई aारा शु4 9कए गए ऐसे संभािवत BेG जहां ऊजा(cid:14) काय(cid:14)कुशलता क(cid:11) अपार संभावनाए ं ह - :252 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] Target Market : Segments with Gas Existing & Proposed (Bubble Size in MW) 10.5 Hotel 731 9.5 Airport 1,698 8.5 Hospital 270 7.5 Retail 754 6.5 Office 5.5 2,590 4.5 7.0 7.5 8.0 8.5 9.0 9.5 10.0 10.5 Financial Attractiveness ssenevitcarttA tekraM (cid:25)(cid:25)(cid:25)(cid:25)ऽऽऽऽ-उउउउMMMMपप पप ााााददददनननन वष (cid:9) 2007 म(cid:16) भारत म(cid:16) एचवीएसी बाजार आकार लगभग 13 (cid:25)बिलयन *कलोवाट था, <जसका लगभग 14% घरेलू (cid:28)ेऽ के िलए था। वष (cid:9) 2004-05 म(cid:16) (cid:25)वंडो स े <ःपिलट एसी का अनुपात 3:1 था और अब 1:1 है। भारत म(cid:16) एचवीएसी बाजार कN ूमुख (cid:25)वशेषता वातानुकूलन बाजार पर आधाJरत है। देश के उM तर& और के9 ि&य भूभाग म(cid:16) गम (cid:9) पानी के जनरेटर= (अथा(cid:9)त गीजर) के िलए बेहतर बाजार संभावनाएं हa। भारत म(cid:16) हर वष (cid:9) लगभग 1.6 िमिलयन ऐसे ह&टर= कN (cid:25)बबN कN जाती है। 1.5 *कलोवाट ूित ह&टर कN औसत (cid:25)व(cid:26)ुत खपत का अनुमान लगाते हुए कुल ःथ ा(cid:25)पत (cid:28)मता लगभग 2400 मेगावाट होगी। यह अनुमान लगाया गया है *क लगभग 3000 मेगावाट गैस आधाJरत पावरप िसः टम कN ःथ ापना भारत म(cid:16) पहले ह& कर ली गई है। उसम(cid:16) स े लगभग 1000 मेगावाट अभी हाल ह& म (cid:16) भारतीय (cid:25)ब<>डंग (cid:28)ेऽ म (cid:16) जोड़& गई है और 1000 मेगावाट ः था(cid:25)पत (cid:28)मता म (cid:16) से 522 मेगावाट सह-उM पादन/(cid:25)ऽउM पादन योजनाओं के िलए है। भ(cid:25)वं य म(cid:16) (cid:25)ऽउM पादन और सहउM पादन बाजार तेजी से बढ़ने कN आशा है। वतम(cid:9) ान बाजार आकार का अनुमान 13 x 106 *कलोवाट (3.7 X 106 ट&आर) है, <जसम(cid:16) से लगभग 2.3 x 106 *कलोवाट (0.65 x 106 ट&आर) शीतल जल आधाJरत के9 ि&य ूणाली का ूितिनिधत व् करता है, जो संभवत: सह उM पादन/(cid:25)ऽउM पादन ूणाली के िलए तM काल ल<(cid:28)त बाजार है। Office Retail Hotel Hospital Airport¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 253 अअअअपपपपििििशशशशंंंंटट टट ससससेे ेे ऊऊऊऊंंंंमम मम ाााा ककककNNNN ूूूूििििततततपपपपििूूििूू तततत (cid:9)(cid:9)(cid:9)(cid:9) भारत म(cid:16) लगभग 13 िमिलयन सआू म, लघु और उ(cid:26)म उ(cid:26)म हa जो भारत म(cid:16) औ(cid:26)ोिग क उ(cid:26)म= कN कुल संh या के 80% से अिधक है। लघु उ(cid:26)ोग= कN *हः सेदार& कुल (cid:25)विनमाण(cid:9) आउटपटु म(cid:16) 45% है और वे अथI(cid:9) य वःथ ा म(cid:16) कुल िनयात(cid:9) के लगभग 40% का योगदान करते हa। वे सबसे बड़े िनयोjत ा हa और लगभग 41 िमिलयन लोग= को रोजगार ूदान करते हa तथा हाल ह& म(cid:16) लगाए गए अनुमान के अनुसार देश के सकल घरेलू उM पाद (जीड&पी) म(cid:16) इनका योगदान लगभग 8-9% है। बीईई Cारा *कए गए अl ययन के अनुसार एसएमई (cid:28)ेऽ एक ऐसा (cid:28)ेऽ है जो 20-25% कN र(cid:16)ज म(cid:16) ऊजा (cid:9) तीोता कम करने कN I यापक संभावनाएं ूदिशत(cid:9) करता है। एसएमई, (cid:25)वशेष Sप से वे <जनके िलए कुल उMप ादन लागत का एक बड़ा भाग ऊजा (cid:9) लागत का ूितिनिधM व करता है, वे ऊजा (cid:9) संर(cid:28)ण कुशलता म(cid:16) सुधार और ऊजा (cid:9) हािन को कम करके उmच लाभ ूाT त कर सकते हa, *फर भी ऐसी बहुत सी बाधाएं और बाजार कN (cid:25)वफलताए ं हa जो इन उपाय= को Iय ापक ःत र पर लागू करने म(cid:16) बाधक हa। ऊजा (cid:9) लागत बढ़ने से Iय ापार के िलए उM पादन और (cid:25)वतरण लागत बढ़ सकती है, इसके फलःव Sप द&घक(cid:9) ािलक ूितः पधा (cid:9) और लाभूदता ूभा(cid:25)वत हो सकती है। सीिमत संसाधन= और ज*टल ूचालन लाभ के कारण एसएमई (cid:25)वशेष Sप से सुभे(cid:26) (सवं ेदनशील) होते हa। ऊजा (cid:9) अपI यय को कम करने से उनकN लागत तMक ाल घट सकती है परंतु वे nान के अभाव म(cid:16) ूाय: (cid:25)वMत पोषण और सम(cid:25)पत(cid:9) कािमक(cid:9) = पर lय ान नह&ं देते हa, जब*क ऊजा (cid:9) कायक(cid:9) ुशलता के अवसर= कN पहचान और सुधार कायब(cid:9) म= को लागू करने के िलए इनकN आवँय कता होती है। बचत कN संभावनाओं को साधारण उपाय= के जJरए मूतS(cid:9) प *दया जा सकता है, इनम(cid:16) से एक कुछ j लःट र= म(cid:16) अपिशंट ऊं मा कN ूितपूित (cid:9) हो सकता है। इसके अलावा कुछ यूिनट= म(cid:16) इनके ूदशन(cid:9) के आधार पर इ9 ह(cid:16) लाग ू करने कN संभावनाओ ं का पता चलेगा jय =*क ये यिू नट(cid:16) j लःट र= म(cid:16) अव<ःथत होती हa। उ9 नत ऊजा (cid:9) कायक(cid:9) ुशलता पर रांश &य िमशन (एनएमईईई) म(cid:16) दशाई(cid:9) गई समय सीमाओ ं के भीतर ूभावी काया9(cid:9) व यन I यवः था स<ृजत करने के उrेँ य से मंऽालय ने बीईई के सOु ढ़&करण और एक संयुjत उ(cid:26)म के Sप म(cid:16) काया9(cid:9) वयन िनगिमत िनकाय के सजृ न Cारा नीितगत/िनयामक दोन= ःत र= पर ूभावी संःथ ागत ढांचे के (cid:25)वःत ार कN िसफाJरश कN है। इसके पJरणामःव Sप ऊजा (cid:9) कायक(cid:9) ुशलता सेवा िलिमटेड (ईईएसएल) कN ःथ ापना कN गई जो के9 ि&य (cid:28)ेऽ के चार सावज(cid:9) िनक उपबम= (सीपीएसय)ू अथात(cid:9) नेशनल थमल(cid:9) पावर कॉपuरेशन िलिमटेड, पावरिमड कॉपuरेशन ऑफ इं*डया िलिमटेड, पावर फाइन(cid:16)स कॉपuरेशन िलिमटेड और Sरल इल jे श&*फकेशन कॉपuरेशन िलिमटेड Cारा सवं िधत(cid:9) एक सयं ुjत उ(cid:26)म कंपनी है। ईईएसएल का कंपनी अिधिनयम 1956 के अंतगत(cid:9) 10 *दसंबर, 2009 को पंजीकरण *कया गया है और Iय ापाJरक कायक(cid:9) लाप शुS करने के िलए इसे 11 फरवर&, 2010 को ूमाण पऽ ूाTत हुआ। यह ऐसी पहली कंपनी है <जसकN ःथ ापना (cid:25)वशेष Sप से द<(cid:28)ण एिशया म(cid:16) ऊजा (cid:9) कायक(cid:9) ुशलता संबंधी उपाय= के काया9(cid:9) वयन हेतु *कया गया है और यह (cid:25)वँव सतर पर एक अनोखा उदाहरण है।254 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] 11112222....11110000 ममममााााननननवववव ससससससंंससंं ााााधधधधनननन ििििववववककककाााासससस ककककााााययययKK!!KK!! मममम मानवीय ह(cid:17)त Bेप के जOरए ऊजा(cid:14) बचत क(cid:11) (cid:15)य ापक संभावना ह।ै बीईई और एसडीए के पास यह एक बड़ा दािय(cid:29)व ह ै 9क वे राRS ीय ऊजा(cid:14) संरBण अिभयान को एक जन आदं ोलन बनाने और (cid:15)य ापक (cid:17)त र पर समथन(cid:14) &ाJत करने के िलए ऊजा(cid:14) काय(cid:14)कुशलता िसHांत; और &9Uया6 (ऊजा(cid:14) संगतता) म7 अमूलचूल पOरवत(cid:14)न के िलए लोग; को &ेOरत कर7। 11वP पंचवषhय योजना म7 बीईई अपने अिभयान; को जारी रखेगा। इसके अलावा केTe सरकार रा/य ; म 7 संगत अिभयान; के िलए एसडीए को आंिशक िनिधयां उपल+ध कराएगी। मानव संसाधन िवकास BेG म7 िनXन िलिखत &यास 9कए जाएगं े : (i) Bमता िनमा(cid:14)ण : क) बीईई और एसडीए के भारत/िवदशे म7 काय(cid:14)रत अिधकारी; ख) ऊजा(cid:14) सरं Bण िबD_डग कोड को बढ़ावा दने े और उसके &वत(cid:14)न हते ु एसडीए, शहरी और नगर िनगम िनकाय; के &मुख अिधकारी; ग) ऊजा(cid:14) संरBण म7 गित लाने के िलए उपलि+धय;, बाधा6 और रणनीितय; क(cid:11) समीBा के िलए केTe और रा/य सरकार के िवभाग; से वOरRठ अिधकाOरय; के िलए हर वष(cid:14) अनु(cid:17)थ ापन काय(cid:14)Uम। (ii) नए (cid:15)य वसाियय; के िलए Bमता िनमा(cid:14)ण : क) ऊजा(cid:14) लेखापरीBक; और &बंधक; के िलए जीवनपय•त &िशBण हते ु पुन"च या(cid:14) &िशBण मॉ’ूल; का &(cid:17)त ाव दते े Iए राRS ीय अिध&माणन परीBा के जOरए बीईई aारा 2003 से ईसी अिधिनयम के अंतग(cid:14)त तैयार 9कए जा रह े ऊजा(cid:14) &बंधक और लखे ापरीBक; ख) ऊजा (cid:14) &बंधक/लेखापरीBक; के िलए राRS ीय परीBा म7 सभं ािवत उXम ीदवार; के िलए शैBिणक/ह_े प लाइन सहायता। (iii) औ(cid:3)ोिगक ऊजा(cid:14) काय(cid:14)कुशल उ(cid:29)प ाद; और &ौ(cid:3)ोिग9कय; के िलए उ(cid:3)िमय; और Jल ांट इंजीिनयर;/तकनीिशयन; को &दKशत करने और उTह 7 समझाने के िलए दो औ(cid:3)ोिगक (cid:17)थ ापना6 म7 &दश(cid:14)न केTe (iv) शीष(cid:14)(cid:17)थ &बंधन, मQय म (cid:17)त रीय काय(cid:14)पालक और शॉप {लोर म7 काम करन े वाले काKमक; के िलए ऊजा (cid:14) काय(cid:14)कुशलता पर अिभमुखीकरण काय(cid:14)शालाए ं (v) ऊजा(cid:14) क(cid:11) दिृ n से कुशल पंप सेट; और अTय संगत उ(cid:29)प ाद; का &दश(cid:14)न कर 9कसान; को &िशBण (vi) dधन क(cid:11) बचत करते Iए वाहन चलाने पर सड़क पOरवहन म7 चालक; को &िशBण (vii) राRS (cid:15)य ापी अिभयान : क) मीिडया के जOरए; ख) रा/य ; क(cid:11) राजधािनय; और अTय (cid:17)थ ान; पर सामाTय जनता और सं(cid:17)थ ान; के िलए जाग4कता कायU(cid:14) म; ग) (cid:17)क ूली ब5च ; के िलए प7€टग &ितयोिगता, घ) युवा *ल ब; के िलए इको *ल ब से जुड़ े काय(cid:14)कला। (viii) ऊजा(cid:14) काय(cid:14)कुशलता/डीएसएम मॉ’ूल; को पाˆUम म 7 शािमल करना : क) (cid:17)क ूल; ख) तकनीक(cid:11) सं(cid:17)थ ान और इंजीिनय€रग कॉलेज; ग) एमबीए काय(cid:14)Uम; सिहत अTय (cid:17)न ातक और (cid:17)न ातको(cid:29)त र पाˆUम। 11112222....11111111 ऊऊऊऊजजजजाााा !! !!ससससररंंररंं (cid:26)(cid:26)(cid:26)(cid:26)णणणण ककककेेेे ििििललललएएएए अअअअCCCCयय यय &&&&ौौौौ(cid:25)(cid:25)(cid:25)(cid:25)ोोोोििििगगगग((((ककककययययाााा//ंं//ंं (cid:26)(cid:26)(cid:26)(cid:26)(cid:27)(cid:27)ेे(cid:27)(cid:27)ेे ससससववववाााािि(cid:15)(cid:15)िि(cid:15)(cid:15) धधधधकककक ऊऊऊऊजजजजाााा (cid:15)(cid:15) (cid:15)(cid:15) ककककुुुुशशशशलललल उउउउपपपपककककररररणणणण ममममॉॉॉॉडडडडलललल <<<<GGGGतत तत ततुुततुु ककककररररनननन ेेेेववववाााालललल ेे ेेििििववववििििननननममममाााातत(cid:15)(cid:15)तत(cid:15)(cid:15) ाााा(cid:24)(cid:24)(cid:24)(cid:24) ककककेेेे ििििललललएएएए पपपपररुुररुु GGGGकक कक ाााारररर हो सकता ह ै उपकरण िविनमा(cid:14)ता कंपिनय; ने ऊजा (cid:14) क(cid:11) दिृ n से कुशल (cid:17)ट ार रेOटत मॉडल का उ(cid:29)प ादन शु4 कर 9दया हो। हालां9क वे (cid:15)य ापक मॉडल; का उ(cid:29)प ादन करत े ह - जो स(cid:17)त े और लोकि&य होते ह - परंत ु ऊजा(cid:14) क(cid:11) दिृ n स े कुशल नहP होते। ऊजा (cid:14) क(cid:11) दिृ n से अिधक कुशल मॉडल; का िविनमा(cid:14)ण करने के िलए िविनमा(cid:14)ता कंपिनय; को¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 255 n~ &ो(cid:29)स ािहत करने के उ द"े य से एक पुर(cid:17)क ार योजना शु4 क(cid:11) जाएगी और यह ऊजा(cid:14) काय(cid:14)कुशलता के िलए उनक(cid:11) &ितबHता को माTय ता &दान करेगा। िव(cid:3)ुत मंGालय ने उ(cid:3)ोग; aारा ऊजा(cid:14) संरBण और कायक(cid:14) ुशलता के BेG म7 नवोदभव और उनक(cid:11) उपलि+धय; को माTय ता दने े के िलए पहले ही राRS ीय ऊजा(cid:14) संरBण पुर(cid:17)क ार (एनईसीए) शु4 कर 9दया ह ै और उपयु(cid:14)*त &(cid:17)त ािवत पुर(cid:17)क ार इस योजना के एक भाग के 4प म7 शु4 9कया जा सकता ह।ै उउउउजजजजाााा (cid:15)(cid:15) (cid:15)(cid:15) ककककुुुुशशशशललललतततताााा एएएएवववव ंं ंंअअअअननननससुुससुु धधंंधधंं ाााानननन ककककेेेे====QQ QQ िव‡ान और &ौ(cid:3)ोिगक(cid:11) िवभाग (डीएसटी) के सहयोग से ऊजा(cid:14) क(cid:11) खपत वाल े चुDनदा BेG; के िलए 10 ऊजा (cid:14) कुशल अनुसंधान केTe ; क(cid:11) (cid:17)थ ापना के िलए काय(cid:14) 9कया जाए। भारत के िलए उपयु*त मॉडल के आधार पर बीईई शैBिणक सं(cid:17)थ ान;, िविनमात(cid:14) ा एसोिसएशन; और ईएससीओ से &(cid:17)त ाव आमंिGत कर सकता ह ै और आरंिभक (cid:17)थ ापना, आरंिभक सचं ालन और 5 वष(cid:14) क(cid:11) अविध के िलए रख रखाव लागत हते ु िनिध उपल+ध कराने का &(cid:17)त ाव द े सकता ह।ै 12वP पंचवषhय योजना म7 इस काय(cid:14)कलाप के िलए िव(cid:29)त ीय बजट आव"य कता 200 करोड़ tपए ह।ै अअअअCCCCयय यय ररररणणणणननननीीीीििििततततययययाााा ंं ंंएएएएवववव ंं ंं&&&&ययययाााासससस अअअअCCCCयय यय ररररणणणणननननीीीीििििततततययययाााा ंं ंं उ(cid:29)ख नन अथवा खरीद और पOरवत(cid:14)न स े लेकर अंितम &योग तक काय(cid:14)कलाप; क(cid:11) सपं ूण(cid:14) मू_य <ृंखला म7 एक(cid:11)कृत संसाधन आयोजना अपनान े के िलए ऊजा (cid:14) और &ौ(cid:3)ोिगक(cid:11) उTन यन BेG स े संबंिधत योजनाकार; और िनयामक; को &ो(cid:29)स ािहत करना। ननननएएएए (cid:26)(cid:26)(cid:26)(cid:26)(cid:27)(cid:27)ेे(cid:27)(cid:27)ेे ////&&&&ययययाााासससस ररररेेेेललललवववव ेे ेे भारतीय रेलवे ने ऊजा(cid:14) सरं Bण के िलए पहले बIत से &यास 9कए ह।- हालां9क संपूण(cid:14) रेलवे BेG म7 ऊजा(cid:14) काय(cid:14)कुशलता बढ़ान े के िलए अभी भी बIत से अवसर मौजूद ह।- इस BेG म7 मौजूदा ऊजा(cid:14) सरं Bण सभं ावना के बावजूद भी यह &(cid:17)त ाव 9कया जाता ह ै 9क रेल मंGालय के सहयोग से इसके िलए अQय यन और िविभTन योजनाए ं शु4 क(cid:11) जाए।ं अअअअििििततततIIIIररररNNNNतत तत (cid:26)(cid:26)(cid:26)(cid:26)(cid:27)(cid:27)ेे(cid:27)(cid:27)ेे 12वP योजना के अतं गत(cid:14) कुछ नए BGे &(cid:17)त ािवत ह - जहा ं ऊजा (cid:14) खपत को कम करन ेक(cid:11) सभं ावनाए ंमौजदू ह,- िजTह 7 बीईई क(cid:11) मौजूदा योजना6 के अंतग(cid:14)त वत(cid:14)मान म7 पयाJ(cid:14) त 4प से शािमल नहP 9कया जा सकता। इनम7 रBा (cid:17)थ ापनाए ं जैसे आयुध िनमा(cid:14)Kणयां (केवल (cid:17)व ैि5छक आधार पर), साव(cid:14)जिनक BेG क(cid:11) यूिनट; (पीएसयू) क(cid:11) टाउनिशप और बड़ े इंजीिनय€रग और िविनमा(cid:14)ण उ(cid:3)ोग शािमल ह।- उउउउ####कक कक ृृृृRRRRटट ट ट तततताााा ककककाााा &&&&ककककााााशशशश ककककेेेेCCCCDD D D 12वP पंचवषhय योजना म7 ऊजा(cid:14) कुशल लाइ€टग &ौ(cid:3)ोिग9कय; को &दKशत करने के िलए लाइ€टग &ौ(cid:3)ोिग9कय; पर आधाOरत एक &दश(cid:14)न केTe (उ(cid:29)क ृRट ता का &काश केTe ) के सृजन पर िवचार 9कया जाए। 11112222....11112222 उउउउपपपपससससहहंंहहंं ाााारररर एएएएवववव ंं ंंििििससससफफफफााााIIIIररररशशशश 66 66 योजना म7 &(cid:17)त ािवत मांग पB &बंधन (डीएसएम) ऊजा(cid:14) काय(cid:14)कुशलता और ऊजा(cid:14) संरBण योजना6 के पOरणाम(cid:17)व 4प 12वP पंचवषhय योजना के अंितम वष(cid:14) अथा(cid:14)त् 2016-17 म7 ऊजा(cid:14) बचत का लLय संभवत: 44.85 िबिलयन यूिनट (उपभो*त ा पB) होना चािहए, जो बस बार पB पर 60.17 िबिलयन यूिनट के समतु_य ह।ै 12वP योजना के अतं म7 इससे लगभग 12,360 मेगावाट पीqकग Bमता के समतु_य िव(cid:3)ुत क(cid:11) बचत का अनुमान256 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] ह।ै िव(cid:3)तु क(cid:11) बचत के अलावा उ(cid:3)ोग; और एसएमई, पOरवहन BेG और ऊजा (cid:14) संरBण (ईसी) पुर(cid:17)क ार म7 21.30 िमिलयन टन तेल समतु_य (एमटीओई) के बराबर कुल थम(cid:14)ल ऊजा(cid:14) बचत भी अपेिBत ह ै िजसका लLय 12वP योजना के अंितम वष(cid:14) म7 हािसल 9कया जाएगा। 12वP योजना के दौरान ऊजा(cid:14) बचत के लLय और बीईई aारा श4ु 9कए गए िविभTन काय(cid:14)Uम; के िलए संगत िनिध आव"य कता के संिBJत िववरण िनXन िलिखत तािलका म7 9दए गए ह - : 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ििििललललएएएए ऊऊऊऊजजजजाााा !! !!बबबबचचचचतततत ललललggggयय यय KKKK.... (cid:26)(cid:26)(cid:26)(cid:26)(cid:27)(cid:27)ेे(cid:27)(cid:27)ेे ययययोोोोजजजजननननााााएएएए ंं ंं ययययोोोोजजजजननननाााा मममम 66 66 (cid:26)(cid:26)(cid:26)(cid:26)(cid:27)(cid:27)ेे(cid:27)(cid:27)ेे मममम 66 66ििििननननििििधधधध ललललिििि(cid:26)(cid:26)(cid:26)(cid:26)तततत ललललिििि(cid:26)(cid:26)(cid:26)(cid:26)तततत थथथथममममलल!!लल!! सससस..ंं..ंं ििििननननििििधधधध कककक++++ ककककुुुुलललल कककक++++ ककककुुुुलललल ििििवववव(cid:25)(cid:25)(cid:25)(cid:25)ततुुततुु GGGGधधधधनननन बबबबचचचचतततत,,,, आआआआवववव----यय यय ककककतततताााा आआआआवववव----यय यय ककककतततताााा बबबबचचचचतततत,,,, एएएएममममटटटटीीीीओओओओईईईई ((((ककककररररोोोोड़ड़ड़ड़ [[[[.... मममम))66))66 ((((ककककररररोोोोड़ड़ड़ड़ [[[[.... बबबबीीीीयययय ूू ूू मममम66)))66) 1 कंपनी आधाOरत िव(cid:3)ुत कंपिनय; के िलए 75 75 - - डीएसएम डीएसएम काय(cid:14)Uम 2 उ(cid:3)ोग उ(cid:3)ोग 690 745 11.96 10.41 एसएमई 55 1.83 1.59 3 आवासीय BेG बचत ल-प योजना 22.50 22.50 4.40 - 4 उप(cid:17)क र एवं मानक एवं लेबDलग 133 1033 10.40 4.30 उपकरण (एस एवं एल) एसईईपी 900 4.21 - 5 कृिष BेG कृिष मांग पB &बंधन 80 80 0.70 - 6 वािणि/यक BेG मौजूदा भवन; म7 ईसीबी 35 35 5.07 - एवं ऊजा(cid:14) काय(cid:14)कुशलता 7 नग र िनगम BेG नगर िनगम मांग पB 25 25 0.47 - &बंधन <+h 8 रा/य नािमत एसडीए का सुदृ करण 140 190 - - एज7िसया ं रा/य ऊजा(cid:14) संरBण िनिध 50 - - 9 राRS ीय पुर(cid:17)क ार, राRS ीय पुर(cid:17)क ार, प7€टग 100 100 3.42 5.00 प7€टग एवं एवं जाग4कता जाग4कता 10 नवोदभव ऊजा(cid:14) काय(cid:14)कुशलता 118 200 - - &ौ(cid:3)ोिग9कयां/BेG अनुसंधान केTe 11 एचआरडी एचआरडी 65 288 - - जोड़ 44.85 21.30 2488.50 मांग पB पर कुल िव(cid:3)ुत बचत, िबिलयन यिू नट 44.85 बस बार पर कुल िव(cid:3)ुत बचत, िबिलयन यिू नट 60.17¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 257 12वP योजना के िलए िनXन िलिखत िसफाOरश7 और नए &यास शु4 करने का सुझाव 9दया जाता ह ै : • ऊजा(cid:14) काय(cid:14)कुशलता +य रू ो और िव(cid:3)ुत मंGालय aारा शु4 क(cid:11) गई योजना6/काय(cid:14)Uम; को जारी रखना • िविभTन रा/य ; म7 रा/य नािमत एज7िसय; (एसडीए) को संगत रा/य म7 िविभTन ऊजा(cid:14) काय(cid:14)कुशलता उपाय; को आगे बढ़ाने के संदभ (cid:14) म7 मह(cid:29)व पूण(cid:14) भूिमका अदा करने क(cid:11) आव"य कता ह।ै 12वP योजना के दौरान एसडीए काय(cid:14)Uम का &मुख जोर 32 एसडीए के सुदढ़ृ ीकरण पर होगा जो उTह 7 बीईई अथवा एसडीए aारा शु4 9कए गए िविभTन काय(cid:14)Uम;/कायक(cid:14) लाप; के काया(cid:14)Tव यन म7 समथ(cid:14) बनाएगा। • 12वP योजना म 7 सभी रा/य ; म7 रा/य ऊजा (cid:14) संरBण िनिध (एसईसीएफ) क(cid:11) (cid:17)थ ापना करने और ऊजा (cid:14) संरBण संबंधी िविभTन काय(cid:14)कलाप; के काया(cid:14)Tव यन तथा एसईसीएफ के अंतग(cid:14)त िनिध के सदपु योग हते ु एसडीए के साथ बातचीत जारी रखने का &(cid:17)त ाव ह।ै एसईसीएफ म7 संगत रा/य सरकार; aारा इतनी ही िनिध का अंशदान 9कया जाए। • उप(cid:17)क र; और उपकरण; के िलए मानक और लेबDलग काय(cid:14)Uम (एस एsड एल) के अंतग(cid:14)त 12वP पंचवषhय योजना म7 &(cid:17)त ािवत काय(cid:14)कलाप; म7 िनXन िलखत शािमल ह - : • कम से कम 5 नए चुDनदा उपकरण; और उप(cid:17)क र; को शािमल करना। 12वP योजना म7 कुछ िव(cid:3)तु उपकरण; म7 वैकि_पक िव(cid:3)तु हािन को कम करने पर भी जोर 9दया जाएगा। • सभी पणधारक; के बीच जाग4कता पैदा करना, • मानक और लेबDलग योजना के अंतग(cid:14)त शािमल उपकरण;/उप(cid:17)क र; के िलए परीBण जांच, लेबल स(cid:29)य ापन, बाजार &भाव मू_य ांकन आ9द करना; और • 11वP योजना के दौरान शािमल 9कए गए उप(cid:17)क र/उपकरण; के िलए ऊजा(cid:14) िनRप ादन मानक; का उTन यन लेबDलग योजना के अतं ग(cid:14)त िनXन िलिखत कायक(cid:14) लाप &(cid:17)त ािवत ह - : • 12वP योजना के &थम वष(cid:14) से &भावी dधन िमत(cid:15)य ियता शतV को लागू करना,258 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] अध य् ाय -13 पपपपीीीीnnnnककककगगगग पपपपााााववववरररर औऔऔऔरररर आआआआररररिििि(cid:26)(cid:26)(cid:26)(cid:26)तततत ममममाााा0000जजजजनननन कककक++++ आआआआवववव----यय यय ककककतततताााा 11113333....0000 पपपपृRृRृRृRठठ ठठ भभभभििूूििूू मममम राRS ीय िव(cid:3)ुत नीित, 2005 का उZ"े य िनXन िलिखत लLय &ाJत करना ह ै : • िव(cid:3)ुत का अिभगम – सभी पOरवार; के िलए िव(cid:3)ुत का अिभगम। • िव(cid:3)ुत क(cid:11) उपल+ध ता – 2012 तक संपूण(cid:14) मांग पूरी करना। ऊजा(cid:14) और पीqकग कमी क(cid:11) सम(cid:17)य ा को दरू 9कया जाए और ि(cid:17)पDनग Oरजव(cid:14) उपल+ध • दB ढंग से और उिचत दर; पर िविनpदRट मानक; के अनु4प िव"व सनीय तथा गणु व(cid:29)त ा यु*त िव(cid:3)ुत क(cid:11) आपूKत। • िव(cid:3)ुत BेG का िव(cid:29)त ीय कायाक_प और वािणि/यक (cid:15)य वहाय(cid:14)ता। • उपभोक् ता6 के िहत; क(cid:11) रBा। जहां एक ओर नीित म7 क(cid:11) गई पOरक_प ना के अनुसार लLय ; को &ाJत करने के िलए बIत काय(cid:14) 9कया गया ह ै और अभी भी &गित जारी ह,ै परंतु उपयु(cid:14)*त म7 से संपूण(cid:14) मांग को पूरा करने, ऊजा(cid:14) और पीqकग किमय; को दरू करन े तथा ि(cid:17)पDनग Oरजव(cid:14) क(cid:11) (cid:15)य व(cid:17)थ ा करने जैसे लLय अभी &ाJत 9कए जाने ह।- ऐसी अपेBा क(cid:11) जाती ह ै 9क य(cid:3)िप आगामी पांच वषV या कुछ और वषV म7 हमारे दशे म7 आधारभूत िव(cid:3)तु भार अिधशेष हो सकता ह,ै परंतु पीक पावर क(cid:11) कमी तब भी बनी रहगे ी। इस पOरद"ृ य म7 आधारभूत लोड पर िव(cid:3)तु ि(cid:17)थित म7 सुधार करने के िलए 9कए जाने वाल े &यास; के पOरणाम(cid:17)व 4प अथ(cid:14)(cid:15)य व(cid:17)थ ा को अपेिBत और लिBत लाभ &ाJत नहP ह;गे। िव(cid:3)ुत के िलए उपभो*त ा6 क(cid:11) मांग दिै नक 4प स े और मौसम के आधार पर बदलती रहती ह।ै पीक समय के दौरान िव(cid:3)ुत क(cid:11) सवा(cid:14)िधक आव"य कता (पीक लोड) होती ह,ै परंतु िव(cid:3)ुत का ‘’आधारभूत लोड’’ पूरे वष(cid:14) भर आव"य क होता ह ै चूं9क िव(cid:3)ुत को आसानी से भंडाOरत नहP 9कया जा सकता, अत: िव(cid:3)तु कंपिनय; को मांग, यहां तक 9क सबस े गरम 9दन अथवा जाड़; के दौरान सबसे ठंड े 9दन म 7 िव(cid:3)ुत क(cid:11) अिधकतम खपत का पूवा(cid:14)नुमान लगाना चािहए और मांग को पूरा करन े के िलए पया(cid:14)Jत माGा म7 िव(cid:3)तु क(cid:11) आपूKत करनी चािहए। खपत मुjय 4प से समय और मौसम पर िनभर(cid:14) करती ह।ै िव(cid:3)ुत कंपिनयां इस मांग को रा/य म7 ि(cid:17)थित पावर Jल ांट; और अTय रा/य ; के पावर Jल ांट; से िव(cid:3)तु क(cid:11) खरीद कर पूरा करती ह।- उपभो*त ा6 को िव(cid:3)ुत क(cid:11) िनबा(cid:14)ध आपूKत सुिनि?त करने के िलए एक िव"व सनीय िव(cid:3)ुत &णाली तैयार करने के उZ"े य से मांग और आपूKत के बीच संतुलन (cid:17)थ ािपत करने क(cid:11) आव"य कता ह।ै मांग के िवपरीत ऊजा (cid:14) का &योग मािपत िव(cid:3)ुत क(cid:11) कुल माGा ह,ै िजसका समय आधार पर उपभो*त ा6 aारा उपोग 9कया जाता ह।ै ऊजा(cid:14) क(cid:11) मांग को तीन <ेिणय; अथा(cid:14)त् ‘’बेसलोड’’, इंटरमीिडएट लोड’’ और ‘’पीक लोड’’ के 4प म7 िवभािजत 9कया जा सकता ह।ै यह ठीक समय पर िव(cid:3)ुत उ(cid:29)प ादन के िलए आव"य क पावर Jल ांट; के &कार और संjय ा िनधा(cid:14)Oरत करने म7 सहायक ह।ै इनम7 से एक अथवा अिधक &कार क(cid:11) मांग को पूरा करने के िलए िविभTन &कार के dधन; अथवा dधन िम<ण का &योग करने वाले अलग अलग &कार के Jल ांट; क(cid:11) आव"य कता होगी। बेसलोड Jल ांट &णाली को आधारभूत (cid:17)त र तक िव(cid:3)ुत उपल+ध करात े ह - और ये सामाTय त: बड़ी उ(cid:29)प ादन यूिनट; के 4प म7 होते ह।- बेसलोड Jल ांट अिधकांशत: लगातार (लगभग 70-80% समय तक) &चािलत 9कए जाते ह।- य े केवल अनुसूिचत रख रखाव, सुधार काय (cid:14) अथवा गैर योजनागत आउटेज के िलए बदं 9कए जात े ह।- ये Jल ांट पूण(cid:14) Bमता पर &चािलत होने के िलए काफ(cid:11) समय लेते ह - और िव(cid:3)ुत आउटपुट बढ़ाने अथवा घटाने क(cid:11) इनक(cid:11) Bमता बIत ही सीिमत होती ह।ै इसके िवपरीत पीक मांग को पूरा करने के िलए (cid:17)थ ािपत 9कए गए Jल ांट (पीqकग Jल ांट) िव(cid:3)ुत के मांग के अनु4प &ित9Uया दते े ह - और इनका आउटपुट बढ़ाया जा सकता ह।ै इन Jल ांट; को तुलना(cid:29)म क 4प से ज_द ी बंद और चाल ू 9कया जा सकता ह।ै हालां9क वे जOटल 4प स े 20% कम समय म7 &चािलत होत े ह।-¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 259 पीqकग Jल ांट अिधकांशत: या तो जलाश आधाOरत जल िव(cid:3)ुत पOरयोजना6 अथवा पंप (cid:17)ट ोरेज &णािलय; या &ाकृितक गैस दहन टबा(cid:14)इन/गैस इंजन के 4प म7 होते ह।- इंटरमीिडएट लोड Jल ांट; क(cid:11) लागत और लचीलापन बेस और पीक लोड Jल ांट; के मQय होता ह।ै इन Jल ांट; का िडजाइन िवशेष 4प से चU(cid:11)य &चालन के िलए 9कया जाता ह ै अथवा य े ऐस े पुराने कोयला आधाOरत Jल ांट होत े ह - जो बेसलोड Jल ांट; के 4प म7 &चािलत करने क(cid:11) दिृ n से बIत अिधक खचhले हो जाते ह।- ये सामाTय त: उ5च लोड मांग, 30 से 60% समय के दौरान &चािलत 9कए जाते ह।- पीqकग Jल ांट; क(cid:11) तलु ना म 7 ये सामाTय त: अिधक दB होत े ह - और इनके िलए अपेBाकृत स(cid:17)त े dधन bोत; का &योग 9कया जाता ह,ै इस &कार इनक(cid:11) &चालन लागत कम होती ह।ै बेसलोड उ(cid:29)प ादन के िलए िडजाइन क(cid:11) गई &णाली म7 यह िवशेषता नहP होती ह ै 9क वे कम समय म7 मांग के अनु4प अपने आउटपुट को पOरवKतत करन े के िलए दBतापूव(cid:14)क अथवा गितशील ढंग स े &ित9Uया द े सक7। मांग म 7 पOरवत(cid:14)न के अलावा उ(cid:29)प ादन म7 भी (cid:15)य ापक िविवधता अपेिBत है, जब नवीकरणीय ऊजा(cid:14) Jल ांट; का (cid:17)थ ािपत बेस बढ़ जाता ह,ै इसके पOरणाम(cid:17)व 4प िड(cid:17)क ोम पर यह दबाव पड़ता ह ै 9क वे नवीकरणीय ऊजा(cid:14) bोत; से अपनी आव"य कता (आरपीओ को पूरा करने) को पूरा कर7। चूं9क हर समय मांग के अनु4प उ(cid:29)प ादन सुिनि?त करने के िलए &णाली क(cid:11) ि(cid:17)थरता आव"य क ह,ै अत: उपयु*त उ(cid:29)प ादन Jल ांट; के जOरए &णाली म7 नवीकरणीय bोत; के िलए पOरवतh मांग/उपल+ध ता सुिनि?त करने के िलए जनरेटर; क(cid:11) Bमता और लचीलेपन को सुिनि?त 9कया जाना चािहए। 11113333....1111 आआआआररररिििि(cid:26)(cid:26)(cid:26)(cid:26)तततत (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा////आआआआररररिििि(cid:26)(cid:26)(cid:26)(cid:26)तततत ममममाााा0000जजजजनननन ((((आआआआररररएएएएमममम)))) आरिBत माKजन िव(cid:3)तु उ(cid:29)प ादन क(cid:11) वह Bमता ह ै जो िव(cid:3)ुत कंपिनयां मांग से परे अनापेिBत आव"य कता और शटडाउन, योजनागत और बलात दोन; को पूरा करने के िलए बनाकर रखती ह।- यह वाKषक और पीक आव"य कता से अितOर*त उ(cid:29)प ादन Bमता होती ह।ै सामाTय &9Uया के अनुसार िव(cid:3)ुत कंपिनय; को अपनी उ(cid:29)प ादन आयोजना म7 कम से कम 15% का आरिBत माKजन बनाए रखना आव"य क ह।ै आरिBत माKजन (आरएम) = ((cid:17)थ ािपत Bमता – पीक लोड) / पीक लोड। अ5छ ा खासा आरिBत माKजन रखने के बावजूद भी &णाली को लोड संभा(cid:15)य ता क(cid:11) उ5च हािन होती ह।ै यह हािन िनXन िलिखत कारण; से हो रही ह ै : i) बलात और अ(cid:29)य िधक रख रखाव दोन; के कारण आउटेज। ii) नवीकरणीय bोत; क(cid:11) िह(cid:17)स दे ारी, जो लगभग 10% ह,ै से पीक घंट; के दौरान उ(cid:29)प ादन नहP होता ह ै और उनक(cid:11) &कृित अ(cid:29)य िधक गैर &ेषणीय ह।ै iii) जल िव(cid:3)ुत पOरयोजना6 क(cid:11) िह(cid:17)स ेदारी लगभग 23% ह ै और जल िव(cid:3)तु पOरयोजना6 क(cid:11) ऊजा (cid:14) तुलना(cid:29)म क 4प से कम होती ह।ै 11113333....2222 &&&&चचचचााााललललनननन IIIIररररजजजजवववव !! !! िव(cid:3)ुत &णाली का &चालन लोड के पूवा(cid:14)नुमान को पूरा करने के उZ"े य से 9कया जाना चािहए। इसके अलावा िव(cid:3)ुत कंपिनयां योजनागत लोड के िलए पूवा(cid:14)नुमान लगाती ह - अथवा इसके समत_ु य िव(cid:3)ुत क(cid:11) &दायगी हते ु अनुसूची तैयार करती ह।- हालां9क िव(cid:3)तु क(cid:11) वा(cid:17)त िवक उपल+ध ता अथवा वा(cid:17)त िवक लोड पूवा(cid:14)नुमान क(cid:11) तुलना म7 अलग हो सकता ह।ै इसके बIत से कारण जसै े &ितकूल मौसम संबंधी ि(cid:17)थितयां अथवा उ(cid:29)प ादन यूिनट; का गरै अनुसूिचत आउटेज हो सकत े ह।- उ(cid:29)प ादन और िवतरण का &बंधन आवृिŽ िनयंGण Oरजव(cid:14) के 4प म7 जानी जाने वाली (cid:15)य व(cid:17)थ ा aारा 9कया जाना चािहए। मांग पूवा(cid:14)नुमान म7 पOरवत(cid:14)न के अनु4प त(cid:29)क ाल उसे पूरा करने के िलए &णाली म7 एक िनि?त माGा म7 अिधशेष ि(cid:17)पDनग Bमता मौजूद होनी चािहए।260 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] &णाली Oरजव(cid:14) को िनXन िलिखत <ेिणय; म7 वगhकृत 9कया जा सकता ह ै : (i) &ाथिमक िनयंGण Oरजव(cid:14) अथवा अंतराल िनयंGण Oरजव(cid:14) (ii) िaतीयक Oरजव(cid:14) अथवा ि(cid:17)पDनग और नॉन-ि(cid:17)पDनग Oरजव(cid:14) (iii) तृतीयक Oरजव(cid:14) अथवा &ित(cid:17)थ ापन Oरजव (cid:14) • ि(cid:17)प Dनग Oरजव(cid:14) ऐसी अितOर*त उ(cid:29)प ादन Bमता ह ै जो उन जनरेटर; के िव(cid:3)तु आउटपुट को ब<+k ने के िलए उपल+ध होती ह,ै जो िव(cid:3)ुत &णाली म7 पहले से जुड़ े रहते ह।- /य ादातर जनरेटर; के िलए िव(cid:3)ुत आउटपुट बढ़ाने का लLय टबा(cid:14)इन के रोटर पर लागू 9कए जाने वाले टॉक(cid:14) को बढ़ाकर &ाJत 9कया जाता ह।ै अंतराल &ित9Uया Oरजव(cid:14) (िजस े िनयामक Oरजव (cid:14) के 4प म7 भी जाना जाता है) आपूKत म7 हािन क(cid:11) एक (cid:17)व चािलत &ित9Uया के 4प म7 उपल+ध कराया जाता ह।ै यह आपूKत क(cid:11) हािन होने पर त(cid:29)क ाल उ(cid:29)प Tन होता ह;ै जनरेटर लोड बढ़ने के कारण शट डाउन हो जाते ह।- इस सम(cid:17)य ा से िनजात पाने के िलए बIत से जनरेटर; म7 गवन(cid:14)र लगाए जाते ह।- जनरेटर; को गित म7 लाने के िलए उनक(cid:11) सहायता कर ये गवन(cid:14)र आउटपुट अंतराल और &(cid:29)य ेक जनरेटर क(cid:11) पावर दोन; को कुछ (cid:17)त र तक बढ़ा दते े ह।- हालां9क अंतराल &ित9Uया Oरजव(cid:14) &ाय: कम होता ह ै और यह &णाली &चालक के िववेकािधकार पर आधाOरत नहP होता ह,ै इसे &चालन Oरजव(cid:14) के भाग के 4प म 7 नहP माना जाता ह।ै &ाथिमक िनयंGण Oरजव(cid:14) का िनयोजन 0-30 सेकंड के िलए 9कया जाता ह।ै य9द अंतराल िवचलन िनयंGक के िनिRUय ब-ड क(cid:11) तुलना म7 अिधक होता ह ै तो &ाथिमक अंतराल िनयंGण &णािलयां स9Uय हो जाती ह।- &ाथिमक कंSोल Oरजव (cid:14) का आधा भाग 15 सेकंड म7 &चािलत हो जाना चािहए और सभी Oरजव(cid:14) 30 सेकंड म7 संपूण(cid:14) िव(cid:3)ुत के साथ &चािलत हो जाने चािहए। • नॉन-ि(cid:17)पDनग अथवा पूरक Oरजव(cid:14) ऐसी अितOर*त उ(cid:29)प ादन Bमता ह ै जो वत(cid:14)मान म7 &णाली से संबH नहP होती ह,ै परंतु थोड़ े समय के बाद ही उस े ऑन लाइन चालू 9कया जा सकता ह।ै एकांत िव(cid:3)तु &णािलय; म 7 यह बामुि"कल फा(cid:17)ट (cid:17)ट ाट(cid:14) जनरेटर; से उपल+ध िव(cid:3)तु के बराबर हो पाता ह।ै हालां9क संबH िव(cid:3)तु &णािलय; म7 इसम7 अTय &णािलय; से आयाितत िव(cid:3)तु अथवा &ितवतh िव(cid:3)तु जो वत(cid:14)मान म7 अTय &णािलय; को िनया(cid:14)त क(cid:11) जा रही ह,ै aारा अ_प सूचना पर उपल+ध िव(cid:3)ुत शािमल हो सकती ह।- िaतीयक Oरजव(cid:14) को 30 सेकंड के भीतर स9Uय हो जाना चािहए और 15 िमनट म7 उTह 7 पूण(cid:14) आउटपुट के साथ &चािलत हो जाना चािहए। उनका पOरचालन (cid:17)व चािलत ढंग से होना चािहए। िaतीयक िनयंGण Oरजव(cid:14) को &णाली म7 आगामी खराबी के िलए &ाथिमक Oरजव(cid:14) को जारी करना चािहए। • तृतीय Oरजव(cid:14)/&ित(cid:17)थ ापन Oरजव(cid:14) : तृतीयक िनयंGण कार(cid:14)वाई &णाली म7 (cid:15)य वधान उ(cid:29) पTन होने से 15 िमनट के भीतर िaतीयक िनयंGण Oरजव(cid:14) स े मु*त हो जानी चािहए। ये कार(cid:14)वाई (cid:17)व चािलत ढगं से होगी और इनम7 स े कुछ मैTय ुअल करनी पड़गे ी। (cid:17)व चािलत कार(cid:14)वाई उस समय जOटल ढंग से शु4 होती ह ै जब आवृिŽ दी गई सीमा6 से नीचे चली जाती ह।ै मैTय ुअल कार(cid:14)वाई Oरजव(cid:14) पावर Jल ांट; (नॉन ि(cid:17)पDनग Oरजव(cid:14)) को स ट् ाट(cid:14) कर &ारंभ क(cid:11) जाती ह ै अथवा &चालनरत Jल ांट (ि(cid:17)पDनग Oरजव(cid:14)) का लोड बढ़ाकर ततृ ीयक िनयंGण मुjय 4प स े &चालक aारा शु4 क(cid:11) गई मTै य ुअल कार(cid:14)वाई पर आधाOरत होता ह।ै वह समयाविध िजतने म7 सभी तीन &कार क(cid:11) Oरजव(cid:14) पावर &चािलत होती है, को नीच े 9दए गए डायNाम म7 दशा(cid:14)या गया ह ै :261 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 11113333....3333 आआआआररररिििि(cid:26)(cid:26)(cid:26)(cid:26)तततत QQQQलल लल ााााटटंंटटंं **** कककक++++ आआआआवववव----यय यय ककककतततताााा इRट तम िव(cid:3)ुत &णाली म 7 लगभग 15-20% Oरजव(cid:14) Jल ाटं , लगभग 20-30% पीqकग Jल ांट, 10-20% मQय वतh Jल ांट और लगभग 50-60% बेसलोड Jल ांट होने चािहए। भारतीय िव(cid:3)ुत &णाली म7 भी मानक आवृिŽ िनयंGण Oरजव(cid:14) सृिजत 9कए जाने क(cid:11) आव"य कता ह।ै ये ऐसे Oरजव (cid:14) ह - जो &ाथिमक 4प स े &णाली म7 िवतरण को पूरा करन े के िलए आरिBत 9कए जाते ह।- Oरजव(cid:14) को 30 सेकंड के भीतर स9Uय 9कया जाना चािहए और अगले 15 िमनट म 7 उनसे पूण(cid:14) आउटपुट &ाJत होना चािहए, ता9क &ाथिमक िनयंGण Oरजव(cid:14) को मु*त 9कया जा सके। इसके िलए &णाली म7 तृतीयक Oरजव(cid:14) भी होने चािहए जो (cid:15)य वधान पदै ा होने स े 15 के भीतर छोटे Oरजव(cid:14) का &भार ले सकती ह - और इन छोटे ((cid:17)क 7टी) Oरजव(cid:14) को मु*त कर सकते ह।- ये सामाTय त: नॉन ि(cid:17)पDनग Oरजव(cid:14) होते ह,- िजTह 7 अ_प सूचना पर &योग म7 लाया जा सकता ह।ै अत: यह मह(cid:29)व पणू (cid:14) ह ै 9क इस बात पर चचा(cid:14) क(cid:11) जाए 9क इन संसाधन; म 7 से &(cid:29)य ेक क(cid:11) 9कतनी संjय ा/माGा उपल+ध होनी चािहए। 11113333....4444 ििििववववककककििििससससतततत ददददशशशशेेेे **** मममम 66 66ममममौौौौजजजजददूूददूू ाााा &&&&((((KKKKययययााााएएएए ंं ंं जहां तक िवदशे ; के िवकिसत िव(cid:3)ुत बाजार; म7 िव(cid:3)ुत &णाली के Oरजव(cid:14) का संबंध ह,ै तो वहा ं आकि(cid:17)मकता6 को पूरा करने के िलए Nाहक; क(cid:11) आव"य कता के अनु4प कई सतह वाले Oरजव(cid:14) रखे जाते ह।- आवृिŽ म7 ह_ क(cid:11) सी िगरावट अथा(cid:14)त् 0.1 से 0.2 हा(cid:143)ज(cid:14) के िलए &थम (cid:29)व Oरत &ित9Uया (cid:17)व 4प एक हॉट Oरजव(cid:14) Jल ांट (िNड म7 सबस े M+h ब एकल यूिनट के समत_ु य ) 5-30 सेकंड म7 (cid:17)व चािलत उ(cid:29)प ादन िनयंGण (एजीसी) के जOरए ऑनलाइन उपल+ध कराया जाता ह।ै िaतीयक चरण के 4प म7 फा(cid:17)ट Oरजव(cid:14) पावर Jल ांट (एफआरपीपी) 4-15 िमनट म7 चाल ू हो जाते ह - और शीu ही पूण(cid:14) लोड पर &चािलत होन े लगते ह,- िजसके प"च ात ् एजीसी Jल ांट Oरजव(cid:14) मोड म7 पुन: चालू हो जाता ह।ै ततृ ीय चरण के 4प म7 OरJल ेसम7ट Oरजव(cid:14) पावर Jल ांट (आरआरपीपी) 45-60 िमनट म7 चालू हो जाते ह,- इसके प"च ात ् एफआरपीपी Jल ांट वापस (cid:17)ट -डबाई मोड म7 चल े जाते ह।- ये Oरजव (cid:14) नीचे िचG 13.1 म 7 दशा(cid:14)ए गए ह - :262 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] ििििचचचच(cid:27)(cid:27)(cid:27)(cid:27) 11113333....1111 To restore first To restore To come on line if response second response frequency drops by plants to plants to standby 0.1 or 0.2 Hz normal िवकिसत दशे ; म7 योजनागत बIसतही Oरजव(cid:14) के तहत िविभTन Oरजव (cid:14) के &चालन का लचीलापन भी उपल+ध कराया जाता ह।ै इसीिलए हॉट Oरजव(cid:14) जो सके ंड के भीतर &चालन हते ु आव"य क ह,ै सामाTय त: (cid:17)व चािलत उ(cid:29)प ादन िनयंGण (एजीसी) के जOरए उपल+ध कराया जाता ह।ै फा(cid:17)ट OरJल ेसम7ट Oरजव(cid:14) 9कसी उ(cid:29)प ादन bोत स े आव"य क होता ह ै जो 4-15 िमनट के भीतर पूण(cid:14) लोड पर &चालन हते ु सBम होता ह ै और जो एजीसी bोत; स े &भार Nहण कर सकता ह।ै हालां9क फा(cid:17)ट ऐD*टग Oरजव(cid:14) स े &भार Nहण करन े के िलए अपेBाकृत धीमे स9Uय n~ उ(cid:29)प ादन bोत के िलए &ित(cid:17)थ ापन Oरजव(cid:14) Bमता का इ(cid:17)त मे ाल 9कया जाता ह,ै त नुसार इन Oरजव(cid:14) Bमता6 म7 स े &(cid:29)य ेक Bमता उपयु*त उ(cid:29)प ादन bोत से होनी चािहए िजसम7 उपयु*त र-पअप और र-प डाउन िवशेषताए ं अंतKनिहत ह;। िNड &चालक aारा सामाTय त: &योग 9कया जान े वाला िनयम यह ह ै 9क उनके पास ऐसी Bमता हमेशा होनी M+h चािहए िजससे वे ब उ(cid:29)प ादन यूिनट क(cid:11) हािन को &ित(cid:17)थ ािपत कर सक7। इसे िनि?त 4प से बIआयामी bोत; aारा &ित(cid:17)थ ािपत 9कया जा सकता ह,ै िजसम7 आयात शािमल ह।- हाइ[ोिलक और आयात Bमता6 के कारण उTह 7 अपिशRट यूिनट; क(cid:11) आव"य कता नहP होती ह।ै अपिशRट यूिनट7 महज ि(cid:17)पDनग Oरजव(cid:14) के िलए सचं ािलत क(cid:11) जाती ह - (परंतु वे सभं ािवत मांग के िलए उTह 7 अिNम 4प से चेतावनी द े दते ी ह-)। Tय ूि*लयर यूिनट; का &योग ि(cid:17)पDनग Oरजव(cid:14) के िलए नहP 9कया जा सकता ह।ै यह या तो ऑन अथवा ऑफ रहती ह-। यह सह उ(cid:29)प ादन अथवा िमि<त ऊRम ा और िव(cid:3)ुत (cid:17)थ ापना6 के िलए सही ह।- IIIIररररजजजजवववव !! !!पपपपरररर हहहहममममााााररररेेेे ससससझझुुझझुु ाााावववव <+ 1. लगभग 10,000 मेगावाट Bमता िजसे अचानक ब ने वाली मांग को पूरा करने के िलए अपेBाकृत कम पीएलएफ पर &चािलत 9कया जाएगा और वे हमारे &ाथिमक िनयंGण Oरजव(cid:14) के 4प म7 ह;गे। 2. पूरक Oरजव(cid:14) अथवा िaतीयक Oरजव (cid:14) भंडारण वाले हाइ[ो (cid:17)ट ेशन, पंप (cid:17)ट ोरेज Jल ांट और गैस इंजन हो सकते ह - जो 30 सेकंड के भीतर स9Uय होने और 15 िमनट म7 पूण(cid:14) आउटपुट &दान करने म7 सBम होते ह।-¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 263 3. तृतीयक Oरजव(cid:14) के 4प म7 कुछ पुराने ऑयल अथवा कोयला आधाOरत (cid:17)ट ेशन हो सकते ह - िजTह 7 मैTय ुअली स9Uय 9कया जा सकता ह ै और जो नए (cid:15)य ावधान; के िलए िaतीयक Oरजव(cid:14) से मु*त होते ह।- भभभभााााररररततततीीीीयययय &&&&णणणणााााििििललललययययाााा ंं ंं दशे का भार अविध कव(cid:14) यह दशा(cid:14)ता ह ै 9क पीक मांग क(cid:11) अविध अपेBाकृत कम होने के कारण यह आKथक दिृ n स े (cid:15)य वहाय(cid:14) नहP होगा 9क पीक मांग को पूरा करने के िलए परू ी तरह से बेस लोड (cid:17)ट ेशन; पर िनभ(cid:14)र रहा जाए। इसस े इस बात का आभास होता ह ै 9क कुछ ऐसे पावर Jल ांट; क(cid:11) (cid:17)थ ापना क(cid:11) जानी चािहए जो केवल पीक मांग के समय ही &चािलत ह;गे। हालां9क, ऐस े Jल ांट; के िलए उनक(cid:11) उ(cid:29)प ादन लागत क(cid:11) वसूली हते ु अलग टैOरफ ढांचा आव"य क होगा। मौजूदा उ(cid:29)प ादन Jल ांट; के साथ साथ नए पीqकग पावर Jल ांट; के िलए पीक और ऑफ पीक अविध म7 अलग अलग टैOरफ ढांचे से इस सम(cid:17)य ा का काफ(cid:11) हद तक समाधान 9कया जा सकता ह।ै नॉन िपट हडे पावर Jल ांट और उ5च पOरवतh &भार वाल े आयाितत कोयला पर आधाOरत तटवतh पावर Jल ांट; म 7 लोड मांग के आधार पर 9दन के समय लोड पOरवKतत करने का िवक_प होना चािहए। ऑफ पीक घंट; के दौरान भी ऐसे कोयला आधाOरत पावर Jल ाटं अपेBाकृत कम लोड पर &चािलत 9कए जा सकते ह।- ििििननननhhhhनन नन ििििललललििििखखखखतततत ििििचचचच(cid:27)(cid:27)(cid:27)(cid:27) मममम 66 66 ववववषषषष !! !! 2222000011116666----11117777 ककककेेेे ििििललललएएएए अअअअििििखखखखलललल भभभभाााा रर ररततततीीीीयययय ''''तत तत रररर पपपपरररर ससससभभंंभभंं ााााििििववववतततत ललललोोोोडडडड अअअअववववििििधधधध ककककवववव !! !! ददददशशशशाााायय!!यय!! ाााा गगगगययययाााा हहहह ैैैै:264 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] 11113333....5555 पपपपीीीीnnnnककककगगगग पपपपााााववववरररर कककक++++ आआआआवववव----यय यय ककककतततताााा दशे म7 िव(cid:3)ुत आपूKत क(cid:11) ि(cid:17)थित लगातार यह दशा(cid:14)ती ह ै 9क यहां ऊजा(cid:14) और पीqकग पावर क(cid:11) कमी ह।ै जहां एक ओर ऊजा(cid:14) क(cid:11) कमी यह अिनवाय(cid:14) बनाती ह ै 9क बेस लोड (cid:17)ट ेशन; क(cid:11) (cid:17)थ ापना क(cid:11) जाए, वहP दसू री ओर पीक घंट; म7 िव(cid:3)ुत क(cid:11) कमी इस बात को उजागर करती ह ै 9क पीक घंट; के दौरान िव(cid:3)तु क(cid:11) मांग को पूरा करने के िलए अलग (cid:15)य व(cid:17)थ ा होनी चािहए। भारतीय रा/य ; म7 पीqकग मांग को यथासंभव अTय रा/ य; से िव(cid:3)ुत क(cid:11) खरीद कर, उनके बीच िaपBीय करार अथवा अंतराल संबH मू_य ; पर गैर अनसु ूिचत आदान-&दान (यूआई) (cid:15)य व(cid:17)थ ा और कभी-कभी लोड शेDडग के जOरए भी क(cid:11) जाती ह।ै हाइ[ो पावर Jल ांट; को भी अचानक पीक मांग को पूरा करने के िलए शीu चालू 9कया जा सकता ह,ै परंतु यह सुिवधा केवल ऐसे कुछ रा/य ; तक ही सीिमत ह ै जहां पया(cid:14)Jत माGा म7 जल भंडारण क(cid:11) सुिवधा वष(cid:14) भर उपल+ध ह।ै पीqकग पावर तालाब/जलाशय आधाOरत हाइ[ो Jल ांट; से आदश(cid:14) 4प से उपल+ध कराई जा सकती ह।ै हालां9क केवल हाइ[ो Bमता से ही पीqकग मांग को पूरा नहP 9कया जा सकता। पीक घंट; के दौरान (cid:29)व Oरत &ित9Uया गैस इंजन आधाOरत उ(cid:29)प ादन से उपल+ध कराई जा सकती ह ै *य ;9क उनम7 उ(cid:29)क ृRट पीqकग सहायता Bमता मौजूद होती ह।ै चूं9क अिखल भारतीय (cid:17)त र पर और कुछ BेG िवशेष म7 अथवा कुछ िवशेष रा/य ; म 7 लगातार पीqकग पावर क(cid:11) कमी बनी Iई ह,ै अत: वहा ं पीqकग पावर (cid:17)ट ेशन; क(cid:11) आव"य कता ह।ै इसी &कार इस तFय को Qय ान म 7 रखत े Iए 9क ऊजा(cid:14) क(cid:11) भी लगातार कमी बनी Iई है, अत: हम7 भिवRय म7 भी बेस लोड/इंटरमीिडएट लोड (cid:17)ट ेशन; म7 िनवेश करते रहने क(cid:11) आव"य कता बनी रहगे ी। &मुख Bमता अिभवृिH, हाइ[ो, कोल और नवीकरणीय ऊजा(cid:14) bोत; स े अपेिBत ह।ै लघु जल िव(cid:3)ुत पOरयोजना6 से Bमता अिभवृिH मुjय त: रन ऑफ Oरवर अथवा छोटे तालाब; पर पOरयोजना (cid:17)थ ािपत कर िवकिसत करने क(cid:11) योजना ह।ै Oटहरी और ती(cid:17)त ा चरण-V म7 1000 मेगावाट पंप (cid:17)ट ोरेज M+ (cid:17)क (cid:11)म को छो कर कोई भी पीqकग स ट् ेशन; का 9UयाTव यन जारी नहP ह।ै इस &कार पीqकग Bमता के िलए योजना बनाने क(cid:11) त(cid:29)क ाल आव"य कता ह।ै यह भी अपेिBत होगा 9क मुjय त: पीqकग और इंटरमीिडएट लोड मांग को पूरा करने के िलए संयु*त चU गैस आधाOरत Bमता का &चालन 9कया जाए। अ_प कािलक बाजार म7 िव(cid:3)ुत क(cid:11) माGा और मू_य दोन; के संदभ(cid:14) म7 मौजूदा tझान एक बार पुन: इस आव"य कता को उजागर करते ह - 9क सामाTय त: पया(cid:14)Jत उ(cid:29)प ादन Bमता और िवशेष 4प से पीqकग पावर Jल ांट; क(cid:11) (cid:17)थ ापना क(cid:11) जाए, ता9क िवतरण कंपिनयां बेस लोड के साथ पीqकग लोड के िलए अपनी आव"य ता6 को पूरा करने हते ु दीघ(cid:14)कालीन आयोजना तैयार कर सक7। 11113333....6666 पपपपीीीीnnnnककककगगगग पपपपााााववववरररर उउउउ####पप पप ााााददददनननन ककककेेेे ििििललललएएएए ििििववववककककYYYYपप प प अिधकतम बेस लोड Bमता ऐसी Bमता होती ह ै जो तकनीक(cid:11) के साथ साथ वािणि/यक 4प से (&चालन क(cid:11) लागत और दBता के संदभ(cid:14) म7) लगभग पूण(cid:14) लोड पर संचािलत लोड ’ूरेशन कव(cid:14) (एलडीसी) के तहत ऊजा(cid:14) क(cid:11) आपूKत कर सकती ह।ै &वीणता Uम म7 मांग को सव(cid:14)&थम Tय ूि*लयर अथवा नवीकरणीय ऊजा(cid:14) bोत; अथवा रन ऑफ Oरवर हाइ[ो (cid:17)ट ेशन; और पंप (cid:17)ट ोरेज हाइ[ो Jल ांट; से पूरा 9कया जाना चािहए िजTह 7 Dसचाई M+ आव"य कता6 को पूरा करन े के िलए पानी छो ना पड़ता ह ै और जो अिनवाय(cid:14) 4प से संचािलत क(cid:11) जाने वाली पOरयोजनाए ं ह।- त(cid:29)प "च ात िपट हडे कोयला आधाOरत (cid:17)ट ेशन; से और अंत म7 लोड स7टर तथा तटवतh कोयला आधाOरत (cid:17)ट ेशन; और संयु*त चU गैस आधाOरत (cid:17)ट ेशन; से मांग पूरी क(cid:11) जाए। बकाया मांग को पूरक तौर पर 9फर से पीqकग पावर Jल ांट; अथा(cid:14)त पीएसपी सिहत (cid:17)ट ोरेज टाइप हाइ[ो उ(cid:29)प ादन (cid:17)ट ेशन, मु*त चU गैस टबा(cid:14)इन (cid:17)ट ेशन और गैस आधाOरत रेसी&ोके€टग इंजन; से पूरा 9कया जा सकता ह।ै¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 265 पीqकग Jल ांट पया(cid:14)वरण क(cid:11) दिृ n से अनुकूल ह;गे और इनक(cid:11) (cid:17)थ ापना के िलए उ(cid:29)स ज(cid:14)न मानदडं ; का अिनवाय(cid:14) 4प से अनुपालन 9कया जाना चािहए, िजससे 9क इनक(cid:11) (cid:17)थ ापना लोड स7टर; के समीप क(cid:11) जा सके। ये पावर Jल ांट आव"य कता अनुसार शीu तथा आव"य क चरण; म7 चालू होने (बंद होने) म7 सBम होन े चािहए ता9क बढ़े Iए लोड के अनु4प &चालन शीu शु4 9कया जा सके। उनक(cid:11) दBता कव(cid:14) उ5च होना चािहए ओर अलग अलग Jल ांट लोड पर समान &चालन म7 सBम होने चािहए। ये Jल ांट हर मौसम म7 &चािलत 9कए जा सक7 और इनम7 वष(cid:14) भर उपल+ध dधन का &योग 9कया जा सके। िविभTन &कार के पीqकग पावर िवक_प और उनके व(cid:17)त ुिनRठ काय(cid:14)कलाप; के संदभ(cid:14) म7 उनक(cid:11) Tय ूनतम 9कफायत का तलु ना(cid:29)म क िववरण तािलका 13.1 म7 नीचे 9दया गया ह ै : ततततााााििििललललककककाााा 11113333....1111 &&&&ककककाााारररर पपपपजजूंूंजजूंूं ीीीी ललललाााागगगगतततत दददद(cid:26)(cid:26)(cid:26)(cid:26)तततताााा ''''थथ थथ ााााययययीीीी ओओओओ पपपपIIIIररररववववतततत(cid:14)(cid:14)(cid:14)(cid:14) ओओओओ ओओओओबबबबीीीीजजजज..ेे..ेे एएएएफफफफएएएएनननन [[[[.... %%%% पपपपIIIIररररववववततततनन!!नन!! एएएएUUUUडड डड एएएएमममम एएएएUUUUडड डड एएएएमममम ककककररररोोोोड़ड़ड़ड़ मममम 66 66 ककककररररोोोोड़ड़ड़ड़////ममममगगेेगगेे ााााववववााााटटटट %%%% [[[[....////((((ककककललललोोोोववववााााटटटट [[[[....////((((ककककललललोोोोववववााााटटटट 2222000011117777 ििििवववव''''तत तत ााााIIIIररररतततत 2222000011117777 ििििवववव''''तत तत ााााIIIIररररतततत अअअअववववििििधधधध अअअअववववििििधधधध गैस इंजन 3.5 43.0 842 442 49991.3 357145.2 - - गैस 4.0 42.2 870 442 50228.4 358514.8 0.47 0.38 (डुअल dधन) डीजल 3.0 43.5 1270 663 50232.9 359198.1 0.48 0.57 एचएफओ ओसीजीटी 3.0 37.8 876 731 50241.9 359270.5 0.50 0.60 पीक लोड &बंधन अ_प कािलक अव िध म7 बIत ही उपयोगी हो सकता ह।ै इसका िवकास दरू (cid:17)थ मापन के जOरए पुन: 9कया जा सकता ह ै और नई लोड आधाOरत टैOरफ &णाली या टाइम ऑफ डे-मीट€रग और टैOरफ (cid:15)य व(cid:17)थ ा अपनाई जा सकती ह।ै हालां9क िवशेष 4प से बड़ े शहर; और बड़ े क(cid:17)ब ; म7 पीqकग घट; के दौरान मांग बIत अिधक बढ़ जाती ह,ै अत: वहां पीqकग Jल ांट; क(cid:11) (cid:17)थ ापना क(cid:11) जाए। ये िवतOरत उ(cid:29)प ादन Jल ांट अथवा (cid:17)ट -ड एलॉन Jल ांट होते ह - जो पीक Jल ांट क(cid:11) आपूKत करते ह।- राRS ीय िNड क(cid:11) (cid:17)थ ापना हो जान े के बाद िव तOरत Jल ांट; का उZ"े य पीक लोड और Oरजव(cid:14) लोड को पूरा करना होगा। भिवRय म7 पीक मांग को पूरा करने के &मुख bोत के 4प म7 िवतOरत पावर Jल ांट; क(cid:11) (cid:17)थ ापना क(cid:11) जा सकती ह।ै पीक लोड सेवा म7 सवा(cid:14)िधक लाभ&द िनवेश गैस और डीजल इंजन आधाOरत Jल ाटं ; और ऐरो डरे ीवेOटव गैस टबा(cid:14)इन Jल ांट म7 होगा। आंतOरक कंबशन इंजन; का सवा(cid:14)िधक सामाTय अनु&योग वै कि_पक और आरिBत Bमता6 को पूरा करने के िलए 9कया जाएगा। इन Jल ांट; क(cid:11) (cid:17)थ ापना +ल ैक आउट अथवा अचानक से मांग बढ़न े क(cid:11) ि(cid:17)थित म7 Jल ांट; क(cid:11) सरु Bा सुिनि?त करने के िलए अ(cid:17)प ताल;, सुपर माकlट, एयरपोट(cid:14), Tय ूि*लयर पावर Jल ांट; और औ(cid:3)ोिगक (cid:17)थ ापना6 म7 क(cid:11) जाएगी। जOटल &कृित के डीजल इंजन; को एक िमनट म 7 चाल ू 9कया जा सकता ह ै और वे 3 िमनट म7 शीu ही पूण(cid:14) लोड पर &चािलत हो सकते ह।- गैस इंजन दो िमनट म7 चालू 9कए जा सकते ह - और आठ िमनट के भीतर अिधकतम आउटपुट &दान कर सकत े ह।- ऐरो डरे ीवेOटव गैस टबा(cid:14)इन पांच िमनट म 7 चाल ू हो सकते ह - और दस िमनट म7 पूण (cid:14) आउटपुट &दान करने म7 सBम ह।- पीक मांग को पूरा करने के िलए इन िवक_प ; पर िवचार 9कया जा सकता ह।ै पीqकग पावर के िलए टैOरफ का िनधा(cid:14)रण केTe ीय िव(cid:3)ुत िनयामक आयोग (सीईआरसी) के 9दशािनदशl ; के अनुसार 9कया जाए।266 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] 11113333....7777 पपपपीीीीnnnnककककगगगग QQQQलल लल ाााांंटटटंंट**** सससस ेे ेेससससबबंंबबंं ििंंििंं धधधधतततत ममममुtुtुtुt ेे ेे पीqकग Jल ांट सामाTय त: गैस टबा(cid:14)इन/गैस इंजन; पर आधाOरत होत े ह - और उनम7 &ाकृितक गैस का इ(cid:17)त ेमाल dधन के 4प म7 9कया जाता ह ै या 9फर य े पंप (cid:17)ट ोरेज &णािलय; के 4प म 7 होते ह।- कुछ Jल ाटं ; म7 dधन के 4प म 7 पेSोल से िनRक Kषत तरल dधन जसै े डीजल ऑयल और जेट dधन का इ(cid:17)त ेमाल 9कया जाता ह ै परंत ु वे सामाTय त: &ाकृितक गैस क(cid:11) तुलना म7 अिधक खचhले होते ह - इसिलए उनका &योग सीिमत माGा म7 और केवल आपात ि(cid:17)थित म7 9कया जाता ह।ै हालां9क बIत स े पीqकग Jल ांट, िजनम7 पेSोिलयम पदाथV का इ(cid:17)त ेमाल 9कया जाता ह,ै उनम7 बैकअप dधन के इ(cid:17)त ेमाल का भी &ावधान होता ह।ै मु*त चU गैस टबा(cid:14)इन पावर Jल ांट; क(cid:11) थमy डाइनेिमक दBता 9कसी नए Jल ांट के िलए 30-42% क(cid:11) र7ज म7 होती ह।ै लोड केTe ; के िनकट पीqकग Jल ांट; के िलए रेसी&ोके€टग गैस इंजन भी अ5छ े िवक_प ह - और ये लगभग 44-48% क(cid:11) उ5च दBता &दान कर सकते ह।- अब यह उ_ल ेख 9कया जाता ह ै 9क सीसीजीटी भी पीqकग (cid:17)ट ेशन के 4प म7 लोड िश{ट आधार पर काय(cid:14) कर सकत े ह।- रन ऑफ Oरवर टाइप से इतर हाइ[ो उ(cid:29)प ादन (cid:17)ट ेशन; का &चालन आव"य क होने पर 9कया जा सकता ह।ै इन पावर (cid:17)ट ेशन; म7 ऑफ पीक घंट; के दौरान पानी भंडाOरत 9कया जा सकता है, ता9क पीक घंट; के दौरान अिधक िव(cid:3)ुत उ(cid:29)प ा9दत 9कया जा सके। अत: इन हाइ[ो उ(cid:29)प ादन (cid:17)ट ेशन; का इ(cid:17)त ेमाल सामाTय त: पीqकग पावर (cid:17)ट ेशन; के 4प म7 9कया जाता ह।ै पंप (cid:17)ट ोरेज हाइ[ो उ(cid:29)प ादन (cid:17) टेशन भी पीक मांग को पूरा करने के िलए एक बेहतर िवक_प ह।ै इसी &कार हम पीक आव"य कता6 को पूरा करने के िलए कुछ जीटी/रेसी&ोके€टग गैस इंजन; क(cid:11) भी योजना तैयार कर सकते ह।- ऐसी अपेBा ह ै 9क इन Jल ांट; को &ित9दन लगभग 6 से 8 घंटे &चािलत 9कया जाएगा। यह िसफाOरश क(cid:11) जाती ह ै 9क ऐसे Jल ांट; क(cid:11) (cid:17)थ ापना मौजूदा अथवा &(cid:17)त ािवत िNड के आसपास मैSो शहर; म 7 क(cid:11) जाए। पीqकग मांग को पूरा करने के अलावा इन Jल ांट; का &चालन &णाली संबंधी आकि(cid:17)मक ि(cid:17)थितय; कम वो_ट ेज, पारेषण संबंधी बाधा6 के समय भी 9कया जा सकता ह,ै इस &कार मैSो शहर; म7 िव(cid:3)ुत आपूKत क(cid:11) िव"व सनीयता बढ़ायी जा सकती ह।ै ऊपर 9दए गए सुझाव के अनुसार सीसीजीटी का पीqकग मोड म7 &चालन और पीक घंट; के दौरान ओसीजीटी के &चालन से उ5च ऊRम ा दर तथा &चालन और रख रखाव लागत (सुधार काय(cid:14) और रख रखाव क(cid:11) उ5च लागत के कारण) बढ़ सकती ह,ै िजसके िलए पावर Jल ांट को BितपूKत क(cid:11) जाएगी। /य ादातर संयु*त चU Jल ांट; म7 2जीटी और 1 (cid:17)ट ीम टबा(cid:14)इन मॉ’ूल होत े ह।- शाम के समय पीक घंट; के बाद &(cid:29)य ेक मॉ’ूल म7 1जीटी को बंद करने और सुबह के समय पीक घंट; के शु4 होत े ही उसे चालू करन े का &(cid:17)त ाव 9दया जाता ह।ै इस &कार रािG के समय ऐसे Jल ांट; को लगभग 50% दBता के साथ &चािलत 9कया जा सकता ह।ै कुछ आधुिनक संयु*त चU गैस आधाOरत Jल ांट; म7 1जीटी और 1एसटी के साथ एकल सेट कन9फगरेशन 9कया जाता ह।ै ऐसी यूिनट; को सायंकाल पीक घंट; के प"च ात रािG के समय पूरी तरह स े बंद रखा जा सकता ह ै अथवा रािG म7 ऑफ पीक घंट; के दौरान आंिशक लोड के साथ &चािलत 9कया जा सकता है। घरेलू bोत; से गैस िNड स े जुड़ े सीसीजीटी Jल ांट; को गैस का आवंटन 70-75% पीएलएफ पर इन Jल ांट; के &चालन के अन4ु प ह।ै ऊपर दशा(cid:14)ए गए ढंग स े सीसीजीटी के चU(cid:11)य &चालन स े उपल+ध गैस का अिधकतम इ(cid:17)त ेमाल 9कया जा सकेगा। वत(cid:14)मान म 7 गैस अथॉOरटी ऑफ इंिडया िलिमटेड (गेल) पावर Jल ांट; aारा गैस के आहरण म 7 बIत अिधक पOरवत(cid:14)न क(cid:11) अनुमित &दान नहP करता ह।ै हालां9क पाइप लाइन Bमता बढ़ने के बाद भिवRय म7 ऐसे पOरवत(cid:14)न संभव ह;गे। इस संदभ(cid:14) म7 मामले को गेल के साथ उठाया जाएगा।¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 267 11113333....8888 पपपपीीीीnnnnककककगगगग टटटटैैIIैैIIररररफफफफ ऊपर 9दए गए सुझाव के अनुसार सीसीजीटी का पीqकग मोड म7 &चालन और पीक घंट; के दौरान ओसीजीटी के &चालन से उ5च ऊRम ा दर तथा &चालन और रख रखाव लागत (सुधार काय(cid:14) और रख रखाव क(cid:11) उ5च लागत के कारण) बढ़ सकती ह,ै िजसके िलए पावर Jल ांट को BितपKू त क(cid:11) जाएगी। अत: यह (cid:17)प Rट ह ै 9क पीqकग पावर क(cid:11) लागत तुलना(cid:29)म क 4प से ऑफ पीक पावर से अिधक होगी। पीक और ऑफ पीक टैOरफ का िनधा(cid:14)रण करने के िलए सीईए के त(cid:29)क ालीन अQय B <ी राकेश नाथ क(cid:11) अQय Bता म7 केTe ीय िव(cid:3)ुत िनयामक आयोग aारा एक काय(cid:14)बल का गठन 9कया गया और काय(cid:14)बल ने अपनी Oरपोट(cid:14) पहले ही &(cid:17)त ुत कर दी ह।ै पीक और ऑफ पीक पावर के िलए अलग अलग टैOरफ क(cid:11) अिधसूचना लोड ’ूरेशन कव(cid:14) को समान बनाने म7 सहायक होगी और अंितम 4प से दशे म 7 िव(cid:3)ुत क(cid:11) इस मांग को पूरा करने के िलए अपेBाकृत कम Bमता अिभवृिH क(cid:11) ज4रत होगी। 11113333....9999 पपपपीीीीnnnnककककगगगग पपपपााााववववरररर QQQQलल लल ााााटटंंटटंं **** ककककेेेे ििििललललएएएए ननननीीीीििििततततगगगगतततत &&&&ययययाााासससस अअअअििििधधधधििििननननययययमममम मममम 66 66&&&&ााााववववधधधधाााानननन पीqकग पावर Jल ांट; क(cid:11) (cid:17)थ ापना शु4 करने के िलए आरंिभक तौर पर नीितगत सहायता क(cid:11) आव"य कता होगी। ऐसे िनXन िलिखत िनयामक 9दशािनदशl मौजूद ह-, िजनम7 इस िवषय पर पहले स े &ावधान उपल+ध ह।- िव(cid:3)तु अिधिनयम, 2003 के अंतगत(cid:14) संगत िविनदशl िनXन ानसु ार ह - : i. ििििवववव(cid:25)(cid:25)(cid:25)(cid:25)ततुुततुु अअअअििििधधधधििििननननययययमममम,,,, 2222000000003333 कककक++++ धधधधाााारररराााा 66661111 ((((खखखख)))),,,, ((((गगगग)))) औऔऔऔरररर ((((डडडड....)))) :::: यह उ_ल ेख 9कया गया ह ै 9क टैOरफ के िनधा(cid:14)रण हते ु िनबंधन और शत(cid:144) िव िनpदRट करने म7 उपयु*त आयोग का िनXन िलिखत aारा माग(cid:14)दश(cid:14)न 9कया जाएगा: क. वािणि/यक िसHांत ख. दBता, संसाधन; का 9कफायती इ(cid:17)त ेमाल, बहे तर िनRप ादन और अिधकतम िनवेश को बढ़ावा दने ा ग. िनRप ादन म7 दBता के िलए पुर(cid:17)क ृत करना। ii. ििििवववव(cid:25)(cid:25)(cid:25)(cid:25)ततुुततुु अअअअििििधधधधििििननननययययमममम,,,, 2222000000003333 कककक++++ धधधधाााारररराााा 66662222 ((((3333)))) : अिधिनयम म7 कुछ िविशRट घटक; क(cid:11) िसफाOरश क(cid:11) गई ह ै जो िविभTन टैOरफ का औिच(cid:29)य (cid:17)थ ािपत करने के िलए आधार सािबत हो सकते ह,- ये िनXन िलिखत ह - : क) 9कसी िवशेष अव िध के दौरान िव(cid:3)ुत क(cid:11) कुल खपत; ख) वह समय िजसम7 आपूKत आव"य क ह;ै ग) आपूKत का (cid:17)व 4प; और घ) वह उZ"े य िजसके िलए िव(cid:3)ुत आपूKत आव"य क ह।ै उपयु(cid:14)*त के आलोक म7 पीqकग पावर नीित तैयार करते समय दBता और दB िनRप ादन को पुरसक् ृत करने जैस े मह(cid:29)व पूण(cid:14) मुदद; का िवशेष 4प से उ_ल ेख करने क(cid:11) आव"य कता ह।ै पीक मांग के (cid:17)व 4प के अनु4प उसे पूरा करन े के िलए &यु*त &ौ(cid:3)ोिगक(cid:11) म 7 कुछ िवशेषताए ं होनी चािहए, जो नीचे सूचीबH क(cid:11) गई ह - : • शीu चालू होना और बंद होना • (cid:29)व Oरत र-प अप दर • –ापक लोड र7ज • +ल ैक (cid:17)ट ाट(cid:14) Bमता • गैर &ितबंिधत अप/डाउन टाइम • dधन क(cid:11) स—िलयत • कम उ(cid:29)स ज(cid:14)न268 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] समKपत पीqकग पावर Jल ांट; के चयन हते ु िनिवदा &9Uया म7 उपयु(cid:14)*त मानदडं ; के आधार पर जOटल मू_य ांकन आव"य क ह।ै पीqकग मांग के िलए िवशेष 4प से समKपत पावर Jल ांट योजनागत Bमता अिभवृिH के भाग के 4प म7 ह;गे और नवीकरणीय ऊजा(cid:14) bोत; क(cid:11) तरह इनके िलए भी 2020 तक 10% (cid:17)थ ािपत Bमता का लLय िनधा(cid:14)Oरत 9कया जाए। इससे उ(cid:29)प ादन िम<ण का अिध कतम इ(cid:17)त ेमाल होगा, जहां एक ओर ''बेस लोड Jल ांट;’’ को उ5च पीएलएफ पर &चािलत 9कया जा सकता ह ै वहP दसू री ओर पीqकग पावर Jल ांट; से 9दन के अलग अलग समय पर चU(cid:11)य आव"य कता6 को पूरा 9कया जा सकता ह ै और नवीकरणीय ऊजा(cid:14) Jल ांट; क(cid:11) सुदढ़ृ तकनी9क के पूरक के तौर पर इनका इ(cid:17)त ेमाल 9कया सकता ह।ै &चालना(cid:29)म क और पूंजीगत (cid:15)य य के संदभ (cid:14) म7 इसका बड़ा लाभ िमलेगा। पीqकग पावर आव"य कता6 को पूरा करने के िलए गैस आधाOरत पावर Jलांट सबस े बेहतर िवक_प ह।- साथ ही चूं9क &ाकृितक गसै एक िवरल संसाधन ह,ै अत: इसका इRट तम इ(cid:17)त ेमाल करने क(cid:11) आव"य कता ह।ै गैस आधाOरत पीqकग पावर उ(cid:29)प ादन के िलए य9द घरेलू dधन आवंOटत नहP 9कया जाता ह ै तो उ(cid:29)प ादन क(cid:11) लागत अिधक होगी। अत: गैस आधाOरत पीqकग पावर Jल ांट; के िलए घरेलू &ाकृितक गैस का अलग आवंटन 9कया जा सकता ह।ै िवतरण कंपिनय; (िड(cid:17)क ॉम) को उिचत लागत सिु नि?त करने के िलए पीqकग पावर Jल ांट; को िनधा(cid:14)Oरत माGा म7 घरेलू गैस आवंOटत क(cid:11) जाए। आरंभ म7 समKपत पीqकग पावर Bमता6 के िलए लगभग 2000 मेगावाट Bमता @ क(cid:11) पOरक_प ना क(cid:11) जाती ह,ै िजसके िलए लगभग 2 एमएमएससीएमडी &ाकृितक गैस ( 25% पीएलएफ) आव"य क होगी। ऐसे पावर Jल ांट पांच मैSो शहर; (&(cid:29) यके 400 मेगावाट) म7 (cid:17)थ ािपत 9कए जाने चािहए। इस संदभ(cid:14) म7 सीईए के चेयरपसन(cid:14) क(cid:11) अQय Bता म7 एक काय(cid:14)बल गOठत 9कया गया ह ै जो पीqकग पावर J लांट; क(cid:11) (cid:17)थ ापना से संबंिधत सभी पहलु6 को दखे ेगा। काय(cid:14)बल क(cid:11) Oरपोट(cid:14) शीu ही &ाJत होने वाली ह।ै आआआआवववव----यय यय कककक ििििववववधधधधााााययययीीीी औऔऔऔरररर ननननीीीीििििततततगगगगतततत ससससहहहहााााययययतततताााा 1111.... राRS ीय िव(cid:3)ुत नीित क(cid:11) तरह पीqकग पावर नीित भी अिधसूिचत 9कए जाने क(cid:11) आव" यकता ह,ै िजसम 7 रा/य ; क(cid:11) िवतरण कंपिनय; को िव(cid:3)ुत का साव(cid:14)भौिमक अिभगम (समाज के सभी वगV-Nामीण, शहरी और कृिष) और सभी को िव(cid:3)ुत क(cid:11) िनबा(cid:14)ध उपल+ध ता सुिनि?त करान े के िलए आव"य क 9दशािनदशl 9दए जाएगं े। 2222.... िव(cid:3)ुत क(cid:11) लागत वसूल करने के िलए चरणबH ढंग से िविभTन &यो*त ा6 के िलए अथवा 9दन म7 अलग अलग समय पर अलग अलग टैOरफ क(cid:11) अनुमित &दान करते Iए यह आव"य क ह ै 9क िनयामक; को ''लोड शेDडग z(cid:11) िस(cid:17)ट म’’ काया(cid:14)िTवत करने के िलए अिधदिे शत 9कया जाए। 3. समKपत पीqकग पावर Jल ांट; से िव(cid:3)ुत क(cid:11) खरीद बोली द(cid:17)त ावेज; म7 यथा पOरभािषत िनXन िलिखत Jल ांट िवशेषता6 के साथ एक नीलामी &णाली (मामला 2 बोली &9Uया क(cid:11) तरह) पर आधाOरत होनी चािहए : • &ित9दन 6 घंटे का &चालन िजसम7 &णाली को कई बार बदं और चालू 9कया जाता ह ै • 10 िमनट के भीतर (cid:17)ट ाट(cid:14) और पूण(cid:14) लोड पर &चालन और दो िमनट के अंदर बंद होने क(cid:11) Bमता सीईआरसी को मॉडल बोली द(cid:17)त ावेज तैयार करन े का काय(cid:14) सkपा जा सकता ह।ै इस सदं भ(cid:14) म7 दो 9दशािनदशl जारी 9कए जा सकते ह - :- (i) आधारभूत लोड के िलए िडजाइन 9कए गए मौजूदा पावर Jल ांट पीqकग पावर Jल ांट; के 4प म 7 सामाTय त: नीलामी &9Uया म7 भाग नहP ल7गे। यह इस तFय से उजागर होता ह ै 9क य9द मौजूदा Jल ांट; के पास ''पीqकग’’ के अंतग(cid:14)त िव(cid:3)ुत आपूKत क(cid:11) अितOर*त Bमता रही होती तो भारत म7 आज मौजूद सीमा तक िव(cid:3)ुत क(cid:11) आपूKत को शेड अथवा &ितबंिधत करन े क(cid:11) आव"य कता ही नहP होती। हमारे दशे म7 /य ादातर Nामीण BेG; को &ित9दन 4 से 6 घंटे ही िव(cid:3)तु क(cid:11) आपूKत क(cid:11) जाती ह ै जब9क शहर; को अलग अलग मौसम के दौरान अलग अविध म7 िव(cid:3)ुत क(cid:11) कटौती का सामना करना पड़ता ह।ै¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 269 (ii) इसके अलावा य9द मौजूदा Jल ांट; को भी पीqकग पावर क(cid:11) आपूKत हते ु अनुमित दी जाती ह ै तो ऐसी ि(cid:17)थित बन सकती ह ै 9क उ(cid:29)प ादन कंपिनयां िवतरण कंपिनय; को बेसलोड आपूKत हते ु अपनी &ितबHता6 को पूरा न कर पाए और अनैितक तरीके से लाभ &ाJत करने के िलए दशे के कुछ अTय भाग; म7 पीqकग आव"य कता को पूरा करने म7 सम(cid:17)य ा पैदा हो। इससे अपेBाकृत कम पूंजी लागत और उ5च दBता के साथ पीqकग पावर Jल ांट; के िलए उपयु*त अितOर*त Bमता भी सुिनि?त होगी। यह सुिनि?त करना मह(cid:29)व पूण(cid:14) ह ै 9क ''पीqकग Jल ांट’’ और बेसलोड Jल ांट के बीच अंतर रखा जाए *य ;9क दोन; तरह के Jल ांट; का एक ही &योजन से &योग करने से पीक समय म7 Bमता का िवभाजन कर बेसलोड &चालक; के 9कसी वग(cid:14) को ही लाभ पIचं ाया जा सकेगा। 1. आरंिभक वषV अथात(cid:14) पीqकग पावर नीित जारी होने क(cid:11) तारीख स े 5 वष(cid:14) म 7 रा/य और केTe ीय िव(cid:3)ुत िनयामक साव(cid:14)जिनक अथवा िनजी BेG aारा (cid:17)थ ािपत पीqकग पावर Jल ांट; के 4प म7 (cid:17)थ ािपत ऐसे नए Jल ांट; स े िवतरण कंपिनय; (िड(cid:17)क ॉम) aारा िव(cid:3)तु क(cid:11) खरीद हते ु अनुमोदन &दान कर सकत े ह-, िजनक(cid:11) Jल ांट पूंजीगत लागत Jल ांट के मािलक aारा &ितयोगी बोली &9Uया के आधार पर (cid:17)थ ािपत क(cid:11) जाती ह ै और गैस का मू_य पास ˜ू कर 9दया जाता ह।ै केTe ीय िव(cid:3)ुत िनयामक आयोग को अिधदिे शत 9कया जाए 9क वह उपयु*त सामाTय मानदडं ; के आधार पर एक मॉडल टैOरफ फॉमू(cid:14)ला पOरभािष करे। &भावी काया(cid:14)Tव यन योजना के साथ उपयु*त नीितगत उपाय; से भारतीय िव(cid:3)ुत BेG म7 लोड –––– शेDडग क(cid:11) मौजूदा सम(cid:17)य ाए ं हल हो जाएगं ी और दशे म7 24X7 िनबा(cid:14)ध िव(cid:3)तु आपूKत का माग(cid:14) &श(cid:17)त होगा और इस &कार यह आKथक समृिH और ि(cid:17)थरता को बनाए रखन े म7 एक साथ(cid:14)क कदम सािबत होगा। हालां9क यह सुिनि?त करन े क(cid:11) आव"य कता ह ै 9क इन उपाय; के पOरणाम(cid:17)व 4प &णाली म7 नई Bमता- ''पीqकग पावर Jल ांट;’’ क(cid:11) (cid:17)थ ापना क(cid:11) जाए। पपपपीीीीकककक औऔऔऔरररर ऑऑऑऑफफफफ----पपपपीीीीकककक घघघघटटंंटटंं **** कककक++++ अअअअववववििििधधधध पीक घंटा Bमता &भार क(cid:11) दिै नक वसूली के िलए 9दन के पीक घंट; क(cid:11) गणना थमल(cid:14) उ(cid:29)प ादन (cid:17)ट ेशन; के मामल; म7 6 घंटे और हाइ[ो (cid:17)ट ेशन मामल; म7 तीन घंटे िनधा(cid:14)Oरत क(cid:11) जाए, इसक(cid:11) घोषणा समय समय पर राRS ीय लोड िड(cid:17)प ैच केTe aारा क(cid:11) जाए। पपपपीीीीकककक औऔऔऔरररर ऑऑऑऑफफफफ पपपपीीीीकककक टटटटैैIIैैIIररररफफफफ ककककेेेे अअअअततंंततंं रररर ककककेेेे ििििललललएएएए आआआआधधधधाााारररर पीक और ऑफ पीक आपूKत के िलए मू_य अलग अलग होने चािहए और टैOरफ म7 वा(cid:17)त िवक (cid:17)त र पर उ(cid:29)प ादन क(cid:11) चर लागत तथा Bमता &भार; के िलए उिचत BितपूKत शािमल होनी चािहए। यह आव"य क होगा 9क पीक और ऑफ पीक समय म7 िव(cid:3)ुत के आहरण और आपूKत के बीच अंतर 9कया जाना चािहए। पीक समय म7 िव(cid:3)तु के अिधक आहरण पर ऑफ पीक समय म7 िव(cid:3)ुत के कुल आहरण क(cid:11) तुलना म 7 अिधक अिधभार (अथा(cid:14)त िनधा(cid:14)Oरत &भार; के 10-50%) वसूल 9कया जाना चािहए, िजसका िनधा(cid:14)रण आरईबी म 7 9कया जाए। 11113333....11110000 भभभभााााररररतततत कककक++++ ममममौौौौजजजजददूूददूू ाााा ससससमममम''''यय यय ााााएएएए ंं ंं चूं9क भारत िव(cid:3)तु के मामले म7 पहले से ही घाटे क(cid:11) ि(cid:17)थित म7 ह ै अत: अब तक भारत म7 अचानक बढ़ी Iई मागं को पूरा करने के िलए कोई भी आरिBत पावर Jल ाटं नहP ह।ै परंतु 5% के ि(cid:17)पDनग Oरजव(cid:14) के साथ भावी आयोजना तैयार करत े समय और इस तथ य् को Qय ान म7 रखते Iए 9क भारत धीरे धीरे एक &ितयोगी बाजार बनता जा रहा ह,ै आरिBत Jल ांट; क(cid:11) पहचान/िनधार(cid:14) ण आव"य क ह।ै िविभTन पणधारक; aारा इस संबंध म 7 &ितवेदन 9दया गया ह ै 9क 5% ि(cid:17)पDनग Oरजव(cid:14) के मानदडं क(cid:11) समीBा क(cid:11) जानी चािहए *य ;9क भारत िनवेश के संदभ(cid:14) म7 5% ि(cid:17)पDनग Oरजव (cid:14) वहन नहP कर सकता। पीqकग और Oरजव (cid:14) Jल ांट; के िलए (cid:17)थ ािपत काय(cid:14)बल इस मुZ े270 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] पर िवचार िवमश(cid:14) कर रहा ह ै और &णाली म7 ि(cid:17)पDनग Oरजव(cid:14) को अपेिBत (cid:17)त र तक कम करने का िनण(cid:14)य काय(cid:14)बल क(cid:11) Oरपोट(cid:14) के आधार पर िलया जाए। 11113333....11111111 उउउउपपपपललललXXXXधध धध ////ससससझझुुझझुु ााााएएएए गगगगएएएए ििििववववककककYYYYपप पप भारत म7 आरिBत माKजन रखने का एक िवक_प यह हो सकता ह ै 9क उिचत िनयामक सहायता के साथ आरिBत Jल ांट; का िनमा(cid:14)ण 9कया जाए। दसू रा िवक_प यह हो सकता ह ै 9क Jल ांट; का &चालन घोिषत Bमता स े िनXन (cid:17)त र पर 9कया जाए ता9क अचानक मांग बढ़ने पर तदनुसार िव(cid:3)ुत उ(cid:29)प ादन 9कया जा सके। भावी योजना6 म7 अितOर*त Bमता क(cid:11) आव"य कता के िलए अQय यन करने हते ु आयोजना कार(cid:14)वाई म7 &णाली म7 5% आरिBत माKजन क(cid:11) आव"य कता को पूरा करन े के िलए उपल+ध ता घटक को कम 9कया जा सकता ह।ै 11113333....11112222 ििििससससफफफफााााIIIIररररशशशश यह िसफाOरश क(cid:11) जाती ह ै 9क 12वP योजना के दौरान कम से कम 2000 मेगावाट Bमता वाले गैस आधाOरत पीqकग पावर Jल ांट; क(cid:11) योजना बनाई जाए। 400 मेगावाट Bमता वाले इन Jल ांट; क(cid:11) (cid:17)थ ापना भारत के 5 बड़ े मैSो शहर; के आसपास क(cid:11) जाए। इन पीqकग Jल ांट; के &चालन से अKजत अनुभव अTय बड़ े शहर; म7 अितOर*त पीqकग Jल ांट; के सृजन और भावी योजना6 म7 अिधक Bमता अिभवृिH का माग(cid:14) &श(cid:17) त करेगा। िविभTन पणधारक; aारा यह सुझाव 9दया गया ह ै 9क &(cid:29)य ेक मैSो शहर; म7 400 मेगावाट Bमता वाले पावर Jल ांट; के बजाय 100-150 मेगावाट Bमता वाले छोटे पीqकग पावर Jल ांट; क(cid:11) (cid:17) थापना क(cid:11) जाए जो उिचत िनयामक सहायता के साथ भारत के सभी BेG;/शहर; म7 िवतOरत आधार पर (cid:17)थ ािपत 9कए जाए।ं पीqकग पावर Jल ांट; से संबंिधत सभी मुZ; पर िवचार िवमश(cid:14) के िलए केTe ीय िव(cid:3)ुत &ािधकरण के चेयरपस(cid:14)न क(cid:11) अQय Bता म7 एक काय(cid:14)बल गOठत 9कया गया ह।ै पावर Jल ाटं ; के आकार और (cid:17)थ ल के बारे म7 काय(cid:14)बल क(cid:11) Oरपोट(cid:14) के आधार पर िवचार 9कया जाए, जो शीu ही &(cid:17)त ुत क(cid:11) जाने वाली ह।ै ------------++++++++++++------------¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 271 अअअअ(cid:2)(cid:2)(cid:2)(cid:2)यय यय ाााायययय 11114444 उउउउपपपपससससहहंंहहंं ाााारररर औऔऔऔरररर ििििससससफफफफााााIIIIररररशशशश 66 66 राRS ीय िव(cid:3)ुत योजना म7 11वP योजना क(cid:11) समीBा, 12वP येाजना के िलए िव(cid:17)त तृ आयोजना और 13वP योजना के िलए सभं ािवत पूवा(cid:14)नुमान शािमल ह।- आयोजना अQय यन 18वP ईपीएस Oरपोट(cid:14) म 7 लगाए गए मांग पूवा(cid:14)नुमान; को Qय ान म7 रखते Iए 9कए गए ह।- इन अQय यन; के पOरणाम; के आधार पर िनXन िलिखत िसफाOरश7 क(cid:11) जाती ह - : ((((1111)))) 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा अअअअििििभभभभववववििृृििृृ ???? आआआआवववव----यय यय ककककतततताााा (i)- 11वP पंचवषhय योजना के दौरान लगभग 54,964 मेगावाट क(cid:11) वा(cid:17)त िवक Bमता अिभवृिH के आधार पर 12वP योजना के दौरान दशे म7 लगभग 87,100 मेगावाट Bमता अिभवृिH, एनईपी के अनुसार 5% ि(cid:17)पDनग Oरजव(cid:14), लगभग 4,000 मेगावाट Bमता वाली पुरानी और अदB थम(cid:14)ल यूिनट; का समापन और सीईए aारा अपनाए गए िव"व सनीयता मानदडं क(cid:11) आव"य कता होगी। िनXन नवीकरणीय/िनXन गैस (आधारभूत मामला), िनXन नवीकरणीय/उ5च गैस, उ5च नवीकरणीय और िनXन गैस और उ5च नवीकरणीय और उ5च गैस के अनु4प चार पOरद"ृ य ; क(cid:11) गणना क(cid:11) गई ह।ै (ii) काब(cid:14)न डाइऑ*स ाइड (CO2) के कुल उ(cid:29)स ज(cid:14)न को कम करने के िलए हाइ[ो, गैस और Tय ूि*लयर आधाOरत Bमता को उ5च &ाथिमकता दी जाती ह।ै पOरयोजना (cid:17)थ ल पर िनमा(cid:14)ण क(cid:11) वा(cid:17)त िवक &गित तथा भूगभhय आकि(cid:17)मकता6, &ाकृितक आपदा6, आर एsड आर तथा पया(cid:14)वरणीय सम(cid:17)य ा6 के चलते जल िव(cid:3)तु पOरयोजना6 के िवकास म 7 अिनि?तता6 को Qय ान म7 रखते Iए 12वP योजना के दौरान 10,897 मेगावाट हाइ[ो Bमता अिभवृिH पर िवचार 9कया गया ह।ै आव"य क बकाया थम(cid:14)ल Bमता अिभवृिH क(cid:11) गणना के उZ"े य से आयोजना अQय यन के िलए 12वP योजना के दौरान 18,500 मेगावाट नवीकरणीय Bमता पर िवचार 9कया गया ह।ै एनपीसीआईएल aारा दी गई सचू ना के अनसु ार 5,300 मेगावाट Tय ूि*लयर Bमता अिभवृिH का &(cid:17)त ाव ह।ै 2,540 मेगावाट गैस आधाOरत Bमता अिभवृिH पर िवचार 9कया गया ह।ै (iii) आधारभूत मामला पOरद"ृ य के अंतग(cid:14)त 12वP योजना के िलए दशे म7 कुल Bमता अिभवृिH आव"य कता क(cid:11) गणना िनXन ानुसार क(cid:11) गई ह ै : कुल Bमता (नवीकरणीय ऊजा(cid:14) bोत; को छोड़कर) ---- 88887777,,,,111100000000 मेगावाट हहहहााााइइइइAAAAोोोो - 10,897 मेगावाट CCCCयय य य ििूूििूू NNNNललललययययरररर - 5,300 मेगावाट थथथथममममलल!!लल!! - 70,903 मेगावाट • ककककोोोोययययललललाााा - 67,843 मेगावाट • ििििलललल1111नन नन ााााइइइइटटटट - 520 मेगावाट • गगगगससैैससैै - 2,540 मेगावाट (iv) 12वP योजना के िलए योजना आयोग aारा (cid:17)थ ािपत 88,537 मेगावाट के लLय के अनुसार 88,537 मेगावाट क(cid:11) कुल Bमता वाली पOरयोजना6 क(cid:11) पहचान क(cid:11) गई ह,ै िजनके िववरण िनXन ानुसार ह - : कुल Bमता (नवीकरणीय ऊजा(cid:14) bोत; को छोड़कर) ---- 88888888,,,,555533337777 मेगावाट हहहहााााइइइइAAAAोोोो - 10,897 मेगावाट CCCCयय य य ििूूििूू NNNNललललययययरररर - 5,300 मेगावाट थथथथममममलल!!लल!! - 72,340 मेगावाट • ककककोोोोययययललललाााा - 69,280 मेगावाट272 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] • ििििलललल1111नन नन ााााइइइइटटटट - 520 मेगावाट • गगगगससैैससैै - 2,540 मेगावाट ((((2222)))) 11113333वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा अअअअििििभभभभववववििृृििृृ ???? आआआआवववव----यय यय ककककतततताााा 12वP योजना के दौरान लगभग 88,000 मेगावाट क(cid:11) Bमता अिभवृिH को Qय ान म7 रखते Iए 13वP योजना के दौरान दशे म7 लगभग 86,400 मेगावाट Bमता अिभवृिH आव"य क होगी। 12वP योजना म7 4 पOरद"ृ य ; के अनु4प 13वP योजना के िलए भी चार पOरद"ृ य अथा(cid:14)त िनXन नवीकरणीय/िनXन गैस (आधारभूत मामला), िनXन नवीकरणीय/उ5च गसै , उ5च नवीकरणीय और िनXन गैस और उ5च नवीकरणीय और उ5च क(cid:11) गणना क(cid:11) गई ह।ै आधारभूत मामले के अंतग(cid:14)त 13वP योजना के िलए दशे म7 कुल Bमता अिभवृिH िनXन ानुसार &(cid:17)त ािवत ह ै : ककककुुुुलललल (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा ---- 88886666,,,,444400000000 मेगावाट (ननननववववीीीीककककररररणणणणीीीीयययय ऊऊऊऊजजजजाााा !! !!;;;;ोोोोतततत**** ककककोोोो छछछछोोोोड़ड़ड़ड़ककककरररर) हाइ[ो - 12,000 मेगावाट Tय ूि*लयर - 18,000 मेगावाट थम(cid:14)ल - 56,400 मेगावाट • कोयला - 56,400 मेगावाट • गैस - 0 मेगावाट • नवीकरणीय - 30,500 मेगावाट हाइ[ो आयात – 8,040 मेगावाट इइइइसससस बबबबाााातततत ककककाााा उउउउYYYYलल लल खखेेखखेे ((((ककककययययाााा जजजजााााएएएए ((((कककक एएएएननननपपपपीीीीससससीीीी ककककेेेे ककककााााययययKK!!KK!! मममम ककककेेेे अअअअननननससुुससुु ाााारररर 11113333वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन 11118888,,,,000000000000 मेगावाट CCCCयय य य ििूूििूू NNNNललललययययरररर (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा अअअअििििभभभभववववििृृििृृ ???? पपपपरररर ििििववववचचचचाााारररर ((((ककककययययाााा जजजजाााा ररररहहहहाााा हहहह।।ैै।।ैै यययय((((दददद इइइइसससस (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा अअअअििििभभभभववववििृृििृृ ???? ककककोोोो ममममततूूततूू !! !! qqqqपपपप ननननहहहह(cid:7)(cid:7)(cid:7)(cid:7) ((((ददददययययाााा जजजजाााातततताााा हहहह,,ैै,,ैै ततततोोोो इइइइसससस ेे ेेककककोोोोययययललललाााा आआआआधधधधााााIIIIररररतततत (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा सससस ेे ेे&&&&िििितततत''''थथ थथ ााााििििपपपपतततत ((((ककककययययाााा जजजजाााा ससससककककतततताााा हहहह।।ैै।।ैै ((((3333)))) ममममहहहह####वव वव पपपपणणूूणणूू !! !!ममममुtुtुtुt ेे ेे तेजी से नई Bमता अिभवृिH सुिनि?त करने के उZ"े य से िनXन िलिखत मुZ;/सम(cid:17)य ा6 का (cid:29)व Oरत समाधान 9कया जाए : (cid:3) भूिम और जल क(cid:11) उपल+ध ता के संदभ(cid:14) म7 यह सुझाव 9दया जाता ह ै 9क &(cid:29)य ेक रा/य को पOरयोजना पूण (cid:14) करने के िलए अनुसूिचत अविध को कम करने के िलए संगत रा/य ; म7 संभािवत पOरयोजना (cid:17)थ ल; के िलए एक भूिम सवlBण करना चािहए। (cid:3) लागत और समयाविध बढ़ने क(cid:11) घटना6 को रोकने के िलए पOरयोजना के संबंध म7 पया(cid:14)वरणीय और वन (cid:17)व ीकृित शीu सुिनि?त क(cid:11) जाए। (cid:3) नई िव(cid:3)ुत उ(cid:29)प ादन Bमता क(cid:11) संपूण(cid:14) मांग को पूरा करने के उZ"े य से नए बीओपी िविनमा(cid:14)ता6 और मौजूदा िविनमा(cid:14)ता6 को अपनी Bमता अिभवृिH और/अथवा िविनमा(cid:14)ण के िविवधीरण हते ु &ो(cid:29)स ाहन दने ा। यह इस BेG म7 &ित(cid:17)प धा(cid:14) बढ़ाने और क(cid:11)मत7 घटाने के िलए भी कारगर िसH होगा। (cid:3) तेजी से बढ़ रही मांग को पूरा करने के िलए अिधक संjय ा म7 उि~मा(cid:14)ण और (cid:17)थ ापना एज7िसय; के गठन को &ो(cid:29)स ािहत करना। (cid:3) सड़क; और पुल; जसै ी भारी मशीनरी के सचं लन हते ु संभार तंG म7 सुधार 9कया जाना चािहए। (cid:3) मह(cid:29)व पूण(cid:14) सामNी जैसे सीम7ट, (cid:17)ट ील आ9द उपल+ध कराना। इसके िलए अिNम (cid:15)य व(cid:17)थ ा आव"य क ह।ै (cid:3) िविभTन कुशल और अकुशल जनशि| क(cid:11) आव"य कता के अनु4प मानव संसाधन िवकास आव"य क ह।ै¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 273 ((((4444)))) ननननीीीीििििततततगगगगतततत &&&&ययययाााासससस कम काब(cid:14)न उ(cid:29)स जन(cid:14) रणनीित क(cid:11) पOरिध म 7 12वP और 13वP योजना के दौरान भारी Bमता अिभवृिH आव"य कता को पूरा करन े के उZ"े य स े बIत स े नीितगत &यास और उपाए 9कए जाने क(cid:11) आव"य ता ह।ै इनक(cid:11) संिBJत जानकारी नीचे दी गई ह:ै (i) केTe ीय िव(cid:3)ुत &ािधकरण (सीईए) संपूण(cid:14) 4प से दशे के िलए एक(cid:11)कृत िव(cid:3)तु आयोजना तैयार करता रहा ह।ै रा/य उ(cid:29)प ादन, पारेषण और िवतरण के िलए रा/य आधाOरत आयोजना करने के िलए िजXम ेदार ह,- िजससे 9क उनक(cid:11) मांग को पूरा करने के िलए ससं ाधन; का इRट तम सदपु योग 9कया जा सके। पहल े रा/य िव(cid:3)ुत बोड (cid:14) जो एक(cid:11)कृत िनकाय Iआ करत े थ े वे रा/य ; के िलए एक(cid:11)कृत िव(cid:3)ुत आयोजना तैयार करत े थे। रा/य ; म7 िव(cid:3)ुत BेG के िवभाजन और उ(cid:29)प ादन, पारेषण और िवतरण के िलए अलग अलग कंपिनय; का गठन 9कए जाने के बाद एक(cid:11)कृत आयोजना और सीईए के साथ समTव य (cid:17)थ ािपत करन े के िलए िजXम ेदार कोई भी एकल संगठन नहP ह।ै यह &(cid:17)त ाव 9कया जाता ह ै 9क &(cid:29)य ेक रा/य म 7 उ(cid:29)प ादन, पारेषण और िवतरण &णािलय; क(cid:11) एक(cid:11)कृत आयोजना 9कसी एकल एज7सी aारा क(cid:11) जाए। इस (cid:15)य व(cid:17)थ ा को सुकर बनाने के िलए &(cid:29)य के रा/य इस &योजन से एक उपयु*त नोडल एज7सी िनयु*त करे जो रा/य म7 उ(cid:29)प ादन और िवतरण कंपिनय; के साथ समTव य (cid:17)थ ािपत करेगी। (ii) राRS ीय िव(cid:3)ुत नीित म7 यह उ_ल ेख 9कया गया ह ै 9क &णाली म7 5% के (cid:17)प Dनग Oरजव(cid:14) का &ावधान आव"य क ह।ै हालां9क (cid:17)प Dनग Oरजव(cid:14) का &ावधान बड़ी Bमता के िलए लागू होता ह,ै जो अTय था &णाली म7 बेकार हो जाएगी। च9ूं क इसका आशय िव(cid:3)ुत पOरयोजना6 क(cid:11) (cid:17)थ ापना म 7 िनिहत भारी धनरािश स े ह,ै िजTह 7 केवल आपातकालीन ि(cid:17)थित म7 &चािलत 9कए जाने क(cid:11) आव"य कता होती ह,ै अत: यह सुझाव 9दया जाता ह ै 9क (cid:17)प Dनग Oरजव(cid:14) क(cid:11) रािश को सबसे बड़ े आकार वाली यूिनट + पीक लोड (1 % पर िवचार 9कया जाए) के भाग से घटाया जाए। 12वP योजना के िलए यह लगभग 3,000 मेगावाट के आसपास ह।ै पीqकग और Oरजव(cid:14) प् लांट के िलए गOठत काय(cid:14)बल इस मुदद े पर जानकारी &दान करे। (iii) पहले 1% एलओएलपी और 0.15% ईएनएस के िव"व सनीयता मानदडं ; के अनु4प उ(cid:29)प ादन आयोजना कार(cid:14)वाई क(cid:11) गई। 12वP और 13वP योजना के िलए Bमता अिभवृिH आयोजना तैयार करते समय िव"व सनीयता मानदडं ; को और अिधक कठोर बनाया गया ह ै और एलओएलपी तथा ईएनएस के िलए Uमश: 0.2% और 0.05% के िव"व सनीयता मानदडं अपनाए गए ह।- यह महससू 9कया जाता ह ै 9क जैस े जैसे उ(cid:29)प ादन Bमता बढ़ती जाएगी। आयोजना मानदडं ; को और अिधक कठोर बनाया जाना चािहए, िजससे 9क उ(cid:29)प ादन क(cid:11) िव"व सनीयता म7 सुधार 9कया जा सके। ((((5555)))) ककककोोोोययययलललल ेे ेेकककक++++ उउउउपपपपललललXXXXधध धध तततताााा सससस ेेेेससससबबंंबबंं ििंंििंं धधधधतततत ममममttुुttुु ेे ेे (i) 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे अअअअततंंततंं ततततकककक ककककोोोोययययललललाााा कककक++++ आआआआवववव----यय यय ककककतततताााा इस उ(cid:29)प ादन आव"य कता को पूरा करन े के उZ"े य स े कोयला आव"य कता (एसपीसीसी पर 0.72 9कलो कैलोरी &ित 9कलोNाम)। कोयला आव"य कता क(cid:11) गणना 842 िमिलयन टन क(cid:11) गई ह।ै 842 िमिलयन टन क(cid:11) कुल आव"य कता क(cid:11) तलु ना म7 आयाितत कोयला आधार पर िडजाइन 9कए गए थमल(cid:14) पावर (cid:17)ट ेशन; aारा 54 िमिलयन टन कोयला आयात 9कया जाना ह।ै एससीसीएल ने लगभग 35 िमिलयन टन कोयले क(cid:11) उपल+ध ता हते ु पुिn क(cid:11) ह ै और लगभग 100 िमिलयन टन कोयला कैिJटव कोयला +ल ॉक; से उपल+ध होने क(cid:11) संभावना ह।ै इस &कार 788 िमिलयन टन कोयले क(cid:11) उपल+ध ता सीआईएल aारा सुिनि?त करने क(cid:11) आव"य कता ह,ै िजसक(cid:11) तुलना म 7 उTह ;न े 477 िमिलयन टन कोयले क(cid:11) आपूKत के िलए &ितबHता (cid:15)य *त क(cid:11) ह।ै अत: पावर (cid:17)ट ेशन; क(cid:11) आ"य कता को पूरा करने के िलए सीआईएल से अनुरोध 9कया जाए 9क वह अपना उ(cid:29)प ादन बढ़ाने के िलए आपातकालीन योजना तैयार करे। (cid:17)व दशे ी कोयले क(cid:11) उपल+ध ता/कमी के िववरण नीचे 9दए गए ह - : (i) वष(cid:14) 2016-17 के दौरान कोयला क(cid:11) आव"य कता = 842 िमिलयन टन (ii) िनXन िलिखत स े कोयला क(cid:11) उपल+ध ता :274 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] (क) सीआईएल = 477 िमिलयन टन (ख) एससीसीसीएल = 35 िमिलयन टन (ग) िव(cid:3)ुत कंपिनय; को आवंOटत कैिJटव +ल ॉक = 100 िमिलयन टन कोयले क(cid:11) कुल उपल+ध ता = 612 िमिलयन टन (घ) आयाितत कोयले पर िडजाइन 9कए गए टीपीएस aारा आयात 9कया जाने वाला कोयला = 54 िमिलयन टन कमी = 176 िमिलयन टन ऊपर बताए अनुसार कोयल े क(cid:11) मांग और उपल+ध ता के बीच उपयु(cid:14)*त अंतर को दरू करने के उZ"े य से िव(cid:3)तु कंपिनय; को सीआईएल से आपूत(cid:14) 9कए जाने वाले कोयले क(cid:11) कमी को पूरा करने के िलए लगभग 117 िमिलयन टन कोयला का आयात करना होगा। आयात 9कए जाने वाले कोयले क(cid:11) यह माGा आयाितत कोयला पर िडजाइन 9कए गए थम(cid:14)ल पावर (cid:17)ट ेशन; aारा आयात 9कए जान े वाले संभािवत 54 िमिलयन टन कोयले से अितOर*त होगी। अत: आयात 9कए जाने वाले कोयले क(cid:11) कुल माGा लगभग 171 िमिलयन टन ह।ै (ii) पावर (cid:17)ट ेशन; को चलान े के िलए कोयल े क(cid:11) सीिमत उपल+ध ता का मामला गंभीर Dचता का िवषय ह।ै अत: िनXन िलिखत &यास 9कए जाने क(cid:11) आव"य कता ह:ै क. घरेलू कोयले का Tय ाियक और सवा(cid:14)िधक उपयु*त ढंग से &योग। घरेलू कोयले क(cid:11) कमी के कारण कोयले के आयात के िलए (cid:15)य व(cid:17)थ ा क(cid:11) जाए। भिवRय म7 केवल सुपर 9UOटकल पावर (cid:17)ट ेशन; के िलए ही कोयला आवंOटत करने का नीितगत िनण(cid:14)य िलया जाए। ख. पावर Jल ांट; को कोयला क(cid:11) उपल+ध ता सुिनि?त करन े के िलए 9कए जान े वाले अT य &यास िनXन ानुसार ह - • िव(cid:3)ुत कंपिनय; के िवकासकता(cid:14)6, कोयला कंपिनय; और अTय उ(cid:3)ोग; aारा िवदशे ; म7 dधन पOरसंपिŽय; का अिधNहण और दीघ(cid:14)कालीन आधार पर कोयले के आयात हते ु (cid:15)य व(cid:17)थ ा करना। • पया(cid:14)Jत कोयला रख रखाव अवसंरचना के साथ सु(cid:15)य वि(cid:17)थत िवशेष पोट(cid:14)/जे‹ी का िवकास। • बंदरगाह; पर बथ(cid:14) आवंटन म7 िव(cid:3)ुत BेG को &ाथिमकता • िव(cid:3)ुत पOरयोजना6 तक कोयले के पOरवहन हते ु पोट(cid:14), रेलवे और सड़क अवसंरचना का पया(cid:14)Jत िवकास। िपटहडे स े पावर Jल ांट तक कोयले के पOरवहन हते ु बढ़ रही आव"य कता के अनु4प रेलव े Sैक; क(cid:11) अितOर*त उपल+ध ता और मौजूदा Sैक;/खंड; का िव(cid:17)त ार। • टीपीएस म7 उपल+ध अनलोDडग सुिवधा6 के अनु4प वैगन; क(cid:11) उपल+ध ता। • ए*स &ेस zेट कोOरडोर का (cid:29)व Oरत काया(cid:14)Tव यन • खनन एज7िसय; क(cid:11) किमय; का पता लगाना और उTह 7 दरू करन े के उपाय • कोयला खनन सुिवधा6 का उTन यन, कोयले क(cid:11) अपेिBत गुणव(cid:29)त ा आ9द। • खान शीष(cid:14) पर पया(cid:14)Jत UDशग सुिवधाए।ं • कोयला खान शीष(cid:14) पर (cid:29)व Oरत लोDडग &णाली/साइलोस क(cid:11) शीu (cid:17)थ ापना। • समKपत z(cid:11)ट कोOरडोर के िनमा(cid:14)ण म7 तेजी लाना। • िव(cid:3)ुत पOरयोजना6 के िलए मामला-।। टैOरफ आधाOरत बोली &9Uया क(cid:11) तरह कोयला खान; का टैOरफ आधाOरत बोली &9Uया के जOरए आवंटन। • कोयला +ल ॉक; के िवकास म7 लगने वाले समय को कम करना। • लागत/समय आधार पर िनजी पBकार; को कोयला खनन का काय(cid:14) आवंOटत 9कया जाए। • रेलवे का बोझ कम करन े और पावर (cid:17)ट ेशन; क(cid:11) दBता बढ़ाने के िलए कोल वाशरीज क(cid:11) (cid:17)थ ापना। • कोयला +ल ॉक; का िवकास।¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 275 ((((6666)))) गगगगससैैससैै कककक++++ उउउउपपपपललललXXXXधध धध तततताााा सससस ेे ेेससससबबबबंंंं ििंंििंं धधधधतततत ममममttुुttुु ेे ेेऔऔऔऔरररर ददददशशशशेेेे मममम 66 66गगगगससैैससैै आआआआधधधधााााIIIIररररतततत उउउउ####पप पप ााााददददनननन ककककोोोो बबबबढ़ढ़ढ़ढ़ााााववववाााा ददददननननेेेे ेे ेेकककक++++ आआआआवववव----यय यय ककककतततताााा (i) अब तक केजी बेिसन से उपल+ध गैस का आवंटन मौजूदा पOरयोजना6 को ही 9कया गया ह ै और िव(cid:3)ुत BGे को उव(cid:14)रक BेG के बाद गैस आवंटन म7 दसू री &ाथिमकता दी गई ह।ै यह िसफाOरश क(cid:11) जाती ह ै 9क दशे म 7 िव(cid:3)तु क(cid:11) कमी और गैस Jल ांट; स े कम काब(cid:14)न उ(cid:29)स ज(cid:14)न को Qय ान म7 रखत े Iए जहां तक घरेलू गैस का संबंध ह,ै तो उ5च &ाथिमकता िव(cid:3)ुत पOरयोजना6 को दी जाए, जो िव(cid:3)तु BेG से CO2 के उ(cid:29)स ज(cid:14)न को सीिमत करन े म7 सहायक होगा। 12वP योजना के दौरान संभािवत कोयला कमी को Qय ान म7 रखत े Iए यह आव"य क होगा 9क िनधा(cid:14)Oरत Bमता अिभवृिH लLय को पूरा करने और CO2 के उ(cid:29)स ज(cid:14)न को कम करने के िलए आगामी 5 वषV म7 गैस आधाOरत पOरयोजना6 से लगभग 25,000 मेगावाट Bमता अिभवृिH के िलए योजना बनाई जाए। ((((iiiiiiii)))) 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे अअअअििंंििंं ततततमममम ववववषषषष !! !!((((2222000011116666----11117777)))) ततततकककक ककककुुुुलललल गगगगससससैैैै आआआआवववव----यय यय ककककतततताााा 12वP योजना के अंितम वष (cid:14) (2016-17) कुल गैस आव"य कता लगभग 178 एमएमएससीएमडी होगी। इसके िववरण नीचे 9दए गए ह - : 11112222 वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे अअअअििंंििंं ततततमममम ववववषषषष !!!!((((2222000011116666----11117777)))) ककककेेेे ििििललललएएएए गगगगससैैससैै आआआआवववव----यय यय ककककतततताााा* 11111111वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे अअअअततंंततंं ततततकककक गगगगससैैससैै आआआआवववव----यय यय ककककतततताााा 88 एएएएममममएएएएममममएएएएससससससससीीीीएएएएममममडडडडीीीी ((((33331111....3333....2222000011112222 कककक++++ िििि''''थथथथिििितततत ककककेेेे अअअअननननससुुससुु ाााारररर 11118888,,,,333388881111 मेगावाट कककक++++ ममममौौौौजजजजददूूददूू ाााा (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा ककककेेेे अअअअननननqqुुqqुु पपपप)))) 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा कककक++++ पपपपIIIIररररययययोोोोजजजजननननाााा.... कककक++++ आआआआवववव----यय यय ककककतततताााा 90 एएएएममममएएएएममममएएएएससससससससीीीीएएएएममममडडडडीीीी ((((22225555,,,,000000000000 मेगावाट (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा ककककेेेे ििििललललएएएए)))) 11112222वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा ककककेेेे अअअअििंंििंं ततततमममम ववववषषषष !! !!((((2222000011116666----11117777 ततततकककक गगगगससैैससैै कककक++++ 178 एएएएममममएएएएममममएएएएससससससससीीीीएएएएममममडडडडीीीी ककककुुुुलललल आआआआवववव----यय यय ककककतततताााा)))) ((((iiiiiiiiiiii)))) ददददशशेेशशेे मममम 66 66गगगगससैैससैै आआआआधधधधााााIIIIररररतततत उउउउ####पप पप ााााददददनननन ककककोोोो बबबबढ़ढ़ढ़ढ़ााााववववाााा ददददननननेेेे ेे ेेकककक++++ आआआआवववव----यय यय ककककतततताााा इन पावर Jल ांट; के अंतKनिहत लाभ; के कारण दशे म7 गैस आधाOरत उ(cid:29)प ादन को बढ़ावा दने े क(cid:11) त(cid:29)क ाल आव"य कता ह,ै िववरण नीच े 9दए अनुसार ह - : ददददशशेेशशेे मममम 66 66ललललोोोोडडडड &&&&ोोोोफफफफााााइइइइलललल ििििवववव----वव वव ससससननननीीीीयययय ढढढढंगंगंगंग सससस ेे ेेआआआआवववव----यय यय ककककतततताााा ककककोोोो पपपपररूूररूू ाााा ककककररररनननन ेे ेेमममम 66 66गगगगससैैससैै आआआआधधधधााााIIIIररररतततत पपपपााााववववरररर QQQQलल लल ााााटटंंटटंं **** कककक++++ भभभभििूूििूू ममममककककाााा :::: सीईआरसी न े पंप स ् टोरेज योजना6 सिहत िविभTन <ेणी के पावर Jल ांट; के िलए पीqकग टैOरफ िनधा(cid:14)Oरत कर पीqकग Bमता6 क(cid:11) (cid:17)थ ापना को &ो(cid:29)स ािहत 9कया ह।ै हाइ[ो पOरयोजना6 के िवकास और िनमा(cid:14)ण म7 अपेBाकृत अिधक समय लगता ह ै और इसके पOरणाम(cid:17)व 4प दशे क(cid:11) उ(cid:29)प ादन Bमता म7 हाइ[ो पावर क(cid:11) िह(cid:17)स ेदारी &ाय: घट जाती ह।ै इस संदभ(cid:14) म7 यह उ_ल ेख 9कया जाता ह ै 9क गैस आधाOरत उ(cid:29)प ादन अTय उपल+ ध िवक_प ; क(cid:11) तुलना म7 अिधक िव"व सनीय ढंग स े पीक/मQय म लोड आव"य कता6 को पूरा करन े म7 मह(cid:29)व पूण(cid:14) भूिमका अदा कर सकता ह।ै ससससससंंससंं ााााधधधधनननन****----भभभभििूूििूू मममम औऔऔऔरररर जजजजलललल पपपपरररर अअअअपपपप(cid:26)(cid:26)ेे(cid:26)(cid:26)ेे ााााककककृृृृतततत ककककमममम ददददबबबबाााावववव गैस आधाOरत Jल ांट; के िलए कोयला आधाOरत Jल ांट; तथा हाइ[ो Bमता6 क(cid:11) तलु ना म 7 भूिम और जल क(cid:11) आव"य कता कम होती ह।ै इस &कार इनक(cid:11) तुलना म7 गैस आधाOरत पावर Jल ांट; क(cid:11) (cid:17)थ ापना स े लोग; का िव(cid:17)थ ापन भी िनि?त 4प स े कम होता ह।ै276 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] कोयला आधाOरत पावर क(cid:11) तुलना म7 बेहतर पया(cid:14)वरणीय लाभ गैस आधाOरत िव(cid:3)तु कोयला आधाOरत िव(cid:3)तु क(cid:11) तुलना म7 अिधक (cid:17)व 5छ होती ह।ै आधुिनक संयु*त चU गैस टबा(cid:14)इन (सीसीजीटी) संयु*त चU गैस इंजन (सीसीजीई) स े CO2 का उ(cid:29)स ज(cid:14)न 660 मेगावाट Bमता वाली सुपर 9UOटकल यूिनट से 0.83 9कलोNाम &ित 9कलोवाट क(cid:11) तुलना म7 माG 0.35 9कलोNाम &ित 9कलोवाट होता ह।ै GGGGधधधधनननन आआआआपपपप00ूू00ूू तततत////GGGGधधधधनननन ससससररुुररुु (cid:26)(cid:26)(cid:26)(cid:26)ाााा जजजजोोोोििििखखखखमममम**** ककककाााा ििििववववििििववववधधधधीीीीककककररररणणणण :::: य(cid:3)िप ऐसी उXम ीद थी 9क केजी-डी6 बेिसन से गैस का उ(cid:29)प ादन शु4 होने के प"च ात घरेलू (cid:17)त र पर &ाकृितक गैस क(cid:11) उपल+ध ता बढ़ेगी, परंत ु अभी हाल के कुछ माह; म7 गैस का उ(cid:29)प ादन एवं उपल+ध ता घटी ह।ै हालां9क &ाकृितक गैस BेG म7 उपयु*त नीितय; को अपनान े स े गैस आधाOरत संयु*त Bमता अिभवृिH के िलए िनयामक पहल से अभी भी dधन आपूKत के जोिखम; को कम करने क(cid:11) उXम ीद ह,ै िजसके पOरणाम(cid:17)व 4प कोयले पर अ(cid:29)य िधक िनभ(cid:14)रता भी कम होगी। यहां तक 9क य9द एलएनजी के 4प म7 गैस के आयात क(cid:11) भी आव"य कता पड़ती ह,ै तो इससे ऐसे bोत बेस; का िविवधीकरण होगा जहां से ऊजा(cid:14) आयात क(cid:11) जाएगी। इस &कार इससे ऊजा(cid:14) सुरBा जोिखम; का िविवधीकरण होगा। ((((iiiivvvv)))) गगगगससैैससैै आआआआधधधधााााIIIIररररतततत (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा अअअअििििभभभभववववििृृििृृ ???? ककककोोोो &&&&ोोोो####सस सस ााााििििहहहहतततत ककककररररनननन ेे ेेककककेेेे ििििललललएएएए अअअअपपपपननननााााएएएए जजजजाााानननन ेे ेेववववाााालललल ेे ेेननननीीीीििििततततगगगगतततत उउउउपपपपाााायययय • उ5च दBता वाले संयु*त ही€टग और कूDलग Jल ांट; सिहत गैस आधाOरत पावर J लांट; को &ो(cid:29)स ािहत करन े के िलए आव"य क नीितगत &यास। • सीसीएचपी Jल ांट; को गैस आवंटन म7 &ाथिमकता। • पीपीए क(cid:11) अविध : पीपीए क(cid:11) अविध 25 वष(cid:14) रखी जाती ह,ै गैस आधाOरत पावर Jल ांट; के वािणि/यक जीवनकाल को Qय ान म7 रखते Iए इसे 15-18 वष (cid:14) करन े क(cid:11) आव"य कता ह।ै इसके अलावा गैस सामाTय त: पांच वष(cid:14) क(cid:11) अविध के िलए आवंOटत क(cid:11) जाती है, अत: पीपीए पर ह(cid:17)त ाBर पांच वष(cid:14) क(cid:11) अविध के िलए 9कए जाने क(cid:11) आव"य कता ह,ै िजसक(cid:11) Jल ांट के 15-18 वष(cid:14) के वािणि/यक जीवनकाल तक गैस आवंटन अविध के िव(cid:17)त ार के अनुसार समय समय पर समीBा क(cid:11) जाए। • dधन जोिखम को आगे बढ़ाना (पास-˜ू) : &ाकृितक गसै के िलए घरेल ू और अंतरा(cid:14)/य ीय बाजार यह सुझाव दते ा ह ै 9क गैस क(cid:11) उपल+ध ता और/अथवा &ाकृितक गैस के मू_य ; के संदभ(cid:14) म 7 बIत सी अिनि?तताए ं ह।- िवकासकता(cid:14) ऐसी आदश(cid:14) ि(cid:17)थित म7 नहP ह - 9क वे उन जोिखम; को वहन कर सक7। अत: dधन क(cid:11) उपल+ध ता और मू_य संबंधी जोिखम; को खरीददार; aारा वहन 9कया जाए। • जोिखम पास-˜ू को (cid:17)व ीकार करना अथवा भुगतान करना : गैस आपूKत करार; क(cid:11) िवशेषता6 म7 dधन Uेता पर उ5च (cid:17)त र क(cid:11) बाQय ता6 को (cid:17)व ीकार करना अथवा उनका भुगतान करना &मुखता से शािमल 9कया जाता ह।ै पीपीए म7 उपयु*त सुधार करन े तथा Tय नू तम ऑफटेक गारंटी के वतम(cid:14) ान (cid:17)त र (अपेBाकृत कम) को उपयु*त ढंग से उ5च (cid:17)त र तक लान े क(cid:11) आव"य कता ह।ै यह भी सुिनि?त करने क(cid:11) आव"य कता ह ै 9क गैस आधाOरत Jल ांट; को &चालन घंट; (पीक/मQय म लोड) के दौरान &ेषण संबंधी जोिखम न उठाना पड़।े • &ितयोगी बोली &9Uया संभावना के अंतग(cid:14)त पूंजी लागत और ऊRम ा दर : अत: बोली &9Uया &ाथिमक 4प से &ित(cid:17)प धh Bमता खोज &भार और पOरवतन(cid:14) दBता6 (िनवल ऊRम ा दर) पर आधाOरत होनी चािहए। य9द कुल िव(cid:3)ुत उ(cid:29)प ादन &णाली के साथ गैस आधाOरत पीqकग पावर को एक(cid:11)कृत 9कया जाता ह ै तो काब(cid:14)न उ(cid:29)स ज(cid:14)न को कम 9कया जा सकता ह,ै भले ही यह नवीकरणीय ऊजा(cid:14) bोत; जैसे पवन अथवा सौर ऊजा(cid:14) क(cid:11) तुलना म7 अिधक *य ; न हो। अत: यह सझु ाव 9दया जाता ह ै 9क गसै आधाOरत पीqकग पOरयोजना6 को नवीकरणीय ऊजा(cid:14) पOरयोजना6 अथवा अ_S ा मेगा पावर पOरयोजना6 के समान¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 277 राजकोषीय लाभ &दान 9कए जाए।ं िवशेष 4प से इTह 7 भी शूTय सीमाशु_क और कर तथा +य ाज दर म7 छूट का लाभ &दान 9कया जाए। • मQय म अथवा पीqकग अनु&योग; के िलए तकनीक(cid:11) आव"य कताए।ं • बोली आमंGण म7 ये िवशेषताए ं िविनpदRट क(cid:11) जानी चािहए *य ;9क इस अनु&योग क(cid:11) िवशेष &कृित dधन और &ौ(cid:3)ोिगक(cid:11) के िवक_प को &भािवत करेगी। य े िनXन ानुसार ह - : (cid:1) इTह 7 एक 9दन म7 कई बार बंद/चालू 9कया जा सकता ह।ै दसू रे श+द ; म7 यह कहा जा सकता ह ै 9क इनका &चालन लोड अनुवतh िसHातं पर 9कया जाता ह।ै (cid:1) कई बार बंद/चालू करने के कारण रख रखाव पर कोई &भाव नहP पड़ता ह।ै (cid:1) चालू करने से पूण(cid:14) लोड तक 5-10 िमनट का समय (cid:1) पूण(cid:14) लोड से शूTय लोड तक आने म7 शट-डाउन के िलए 5-10 िमनट का समय (cid:1) बैक-(cid:17)ट ाट(cid:14) Bमता (cid:1) Jल ांट के आंिशक भार &चालन के कारण दBता पर कोई &भाव नहP पड़ता (cid:1) उ5च उपल+ध ता - >94% । ((((7777)))) FFFFीीीीनननन हहहहााााउउउउसससस गगगगससैैससैै उउउउCCCCमम मम ललूूललूू नननन ररररणणणणननननीीीीिििितततत उ(cid:29)स ज(cid:14)न मानक; को पूरा करने के उZ"े य से Nीन हाउस गैस उTम ूलन रणनीित अपनान े क(cid:11) आव"य कता ह।ै आगामी कुछ योजना अविध म7 उ(cid:29)प ादन Bमता अिभवृिH म7 कोयला आधाOरत उ(cid:29)प ादन के िलए कोयला के &मुख bोत बने रहने क(cid:11) संभावना को Qय ान म7 रखते Iए &(cid:17)त ािवत कुछ &मुख &यास िनXन ानुसार ह - : • उ5च वाRप मानदडं ; के साथ यूिनट आकार बढ़ाना • &ौ(cid:3)ोिगक(cid:11) िवकास – उ5च यूिनट आकार और (cid:17)व च छ् कोयला &ौ(cid:3)ोिग9कय; को अपना (cid:2) सुपर 9UOटकल &ौ(cid:3)ोिगक(cid:11) – दो &ितशत दBता लाभ संभव (cid:2) अ_S ा सुपर 9UOटकल &ौ(cid:3)ोिगक(cid:11) – 800 मेगावाट सुपर 9UOटकल पर 0.7% क(cid:11) अितOर*त दBता (cid:2) एक(cid:11)कृत गैसीकरण &ौ(cid:3)ोिगक(cid:11) – 40-45% अिधक दBता • पुराने पावर (cid:17)ट ेशन; का नवीनीकरण और आधुिनक(cid:11)करण तथा जीवन िव(cid:17)त ार – िनिध संबंधी बाधा6 को दरू करने के िलए सीडीएम के लाभ &दान 9कए जाए ं • ऊजा(cid:14) काय(cid:14)कुशलता म7 सुधार करना • पुरानी एवं आदB यूिनट; को बंद करना • कोयले क(cid:11) गुणव(cid:29)त ा म7 सुधार करना अअअअCCCCयय यय उउउउपपपपाााायययय**** मममम 66 66ििििननननhhhhनननन ििििललललििििखखखखतततत शशशशााााििििममममलललल हहहह ii ii :::: • टी और डी हािनय; को कम करना – वष(cid:14) 2011-12 म7 अिखल भारतीय (cid:17)त र पर टी और डी हािनयां 23.79% थP। इTह 7 15% तक लाने का लLय • ऊजा(cid:14) के &योग म7 काय(cid:14)कुशलता • कोयले के पOरवहन को कम करने के िलए िपट हडे (cid:17)ट ेशन; क(cid:11) (cid:17)थ ापना ((((8888)))) ननननववववीीीीककककररररणणणणीीीीयययय ऊऊऊऊजजजजाााा !! !!;;;;ोोोोतततत**** ककककाााा ििििववववककककाााासससस नवीकरणीय ऊजा (cid:14) को जलवायु पOरवत(cid:14)न पर भारत क(cid:11) राRS ीय योजना म7 उपयु*त ढगं से &मुख (cid:17)थ ान 9दया गया ह।ै 12वP एवं 13वP योजना6 के दौरान नवीन एवं नवीकरणीय ऊजा(cid:14) मंGालय (एमएनआरई) aारा लगभग 60,000 मेगावाट नवीकरणीय Bमता अिभवृिH क(cid:11) योजना बनाई गई ह।ै278 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ((((9999)))) ऊऊऊऊजजजजाााा !! !!ससससररंंररंं (cid:26)(cid:26)(cid:26)(cid:26)णणणण औऔऔऔरररर ममममाााागगंंगगंं पपपप(cid:26)(cid:26)(cid:26)(cid:26) उउउउपपपपाााायययय िव(cid:3)ुत क(cid:11) मांग और आपूKत के बीच अंतर को दरू करन े के िलए ऊजा(cid:14) सरं Bण और मांग पB उपाय लागत &भावी साधन के 4प म7 बने रहग7 े। ऊजा(cid:14) कायक(cid:14) ुशलता, ऊजा(cid:14) का संरBण और मांग पB &बंधन वाली िGपBीय पहल क(cid:11) भारत सरकार के वष(cid:14) 2012 तक ''सभी के िलए िव(cid:3)ुत’’ उपल+ध करान े के िमशन को &ाJत करन े म7 मह(cid:29)व पूण(cid:14) भूिमका होगी। इस 9दशा म7 िव(cid:3)ुत BेG को इस पOरवतन(cid:14) को सफल बनान े म7 केTe ीय भूिमका अदा करनी ह।ै आपूKत वच(cid:14)(cid:17)व तथा Bमता िव(cid:17)त ार क(cid:11) बजाय मौजूदा िव(cid:3)ुत उ(cid:29)प ादन (cid:17) टेशन; क(cid:11) &चालन दBता म7 सुधार, पारेषण और िवतरण हािनय; को कम करने और सवा(cid:14)िधक मह(cid:29)व पूण(cid:14) ढंग से अंितम &यो*त ा के (cid:17)त र पर दBता म7 सुधार करने के िलए Bमता िव(cid:17)त ार पर Qय ान आकृRट करने क(cid:11) आव"य कता ह।ै ऊजा(cid:14) काय(cid:14)कुशलता, ऊजा (cid:14) का संरBण और मांग पB &बंधन पर िवशेष 4प से जोर दने े क(cid:11) आव"य कता ह।ै ((((11110000)))) पपपपीीीीnnnnककककगगगग पपपपााााववववरररर QQQQलल लल ााााटटंंटटंं **** कककक++++ आआआआवववव----यय यय ककककतततताााा (i) यह िसफाOरश क(cid:11) जाती ह ै 9क 12वP योजना के दौरान कम से कम 2000 मेगावाट गैस आधाOरत पीqकग पावर Jल ांट; क(cid:11) (cid:17)थ ापना क(cid:11) जाए िजसम7 से उिचत िनयामक सहायता के साथ भारत के 5 &मुख मैSो शहर; म7 400 मेगावाट Bमता (cid:17)थ ािपत क(cid:11) जाए। इन पीqकग Jल ांट; के &चालन से हािसल अनुभव अTय बड़़े शहर; म7 अितOर*त पीqकग Jल ांट; क(cid:11) (cid:17)थ ापना और भावी Jल ांट; क(cid:11) बेहतर Bमता का माग(cid:14) &श(cid:17)त करेगा। ((((iiiiiiii)))) पीqकग पावर Jल ांट; से संबंिधत मुZ; पर िव(cid:17)त ार से चचा(cid:14) करने के िलए सीईए के अQय B क(cid:11) अQय Bता म7 एक काय(cid:14)बल गOठत 9कया गया ह।ै यूिनट; के आकार और (cid:17)थ ान; के बारे म7 काय(cid:14)बल क(cid:11) शीu ही &(cid:17)त ुत क(cid:11) जाने वाली Oरपोट(cid:14) के आधार पर िवचार 9कया जाए। ----------------++++++++++++------------¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 279 CENTRAL ELECTRICITY AUTHOIRTY NOTIFICATION New Delhi, the 30th December, 2013 National Electricity Plan F. No. CEA/PLG/IRP/2/10/2013.—In exercise of the powers conferred by sub-section (4) of Section 3 of the Electricity Act, 2003 (hereinafter referred to as the Act), the Central Electricity Authority hereby notifies the National Electricity Plan (hereinafter referred to as the Plan). Volume I of the Plan covers the Generation and related aspects and Volume II covers the Transmission and related aspects. As per the stipulation of sub-section (4) of Section 3 of the Act, the Plan is in accordance with the National Electricity Policy, covering 11th Plan in detail and perspective planning for 12th and 13th Plans. The Plan is annexed in Appendix I (Volume I) and Appendix II (Volume II). T.K. BARAI, Secy. CEA [ ADVT III/4/Exty./186-B/13] National Electricity Plan (Volume I) Generation [In fulfilment of CEA's obligation under section 3(4) of the Electricity Act, 2003] Government of India Ministry of Power Central Electricity Authority November, 2012280 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ACRONYMS ACRONYMS EXPANSION AC Alternating Current AG&SP Accelerated Generation & Supply Programme AHWR Advanced Heavy Water Reactor AIIMS All India Institute of Medical Sciences AMD Atomic Minerals Directorate APM Administered Price Mechanism AREP Accelerated Rural Electrification Programme BARC Bhabha Atomic Research Centre Bcum, BCM, Bm3 Billion cubic metre BEE Bureau of Energy Efficiency BFP Boiler Feed Pump BHEL Bharat Heavy Electricals Ltd. BSES Bombay Suburban Electric Supply BU Billion units or Billion kWh C&I Control & Instrumentation CAD & CAM Computer-Aided Design & Computer-Aided Management CAGR Compounded Annual Growth Rate CBIP Central Board of Irrigation & Power CBM Coal Bed Methane CCEA Cabinet Committee on Economic Affairs CCGT Combined Cycle Gas Turbine CD Compact Disc CDAC Centre for Development of Advanced Computing CDM Clean Development Mechanism CEA Central Electricity Authority CFBC Circulating Fluidized Bed Combustion CFL Compact Fluorescent Lamp CFRI Central Fuel Research Institute CIL Coal India Ltd. CLA Central Loan Assistance CPP Captive Power Producer CPRI Central Power Research Institute CPSU Central Public Sector Undertaking Crs Crores CS Central Sector CSIR Council for Scientific and Industrial Research CSMRS Central Soil & Materials Research Station CWC Central Water Commission DAE Department of Atomic Energy DC Direct Current DDG Decentralised Distributed Generation¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 281 DGH Director General Hydro Carbon DG Set Diesel Generating Set DISCOM Distribution Company DMLF Data Management & Load Forecasting DOPT Department of Personnel & Training DPR Detailed Project Report DSM Demand - Side Management DST Department of Science & Technology DSTATCOM Distribution Static Compensation DVC Damodar Valley Corporation DVR Dynamic Voltage Restorer EA 2003 Electricity Act 2003 ECIL Electronic Corporation of India Ltd. EGEAS Electric Generation Expansion Analysis System ENS Energy Not Served EPS Electric Power Survey ERDA Electric Research & Development Association ESCO Energy Service Company ESP Electro Static Precipitator EPC Engineering Procurement Contract FAUP Fly Ash Utilisation Programme FBC Fluidised Bed Combustion FO Forced Outage FOR Forum of Regulators GCV Gross Calorific Value GDP Gross Domestic Product GHG Green House Gas GIS Gas Insulated Switchgear GPS Geographic Positioning System GR General Review GSPC Gujarat State Petroleum Corporation GT Gas Turbine GWe Gega Watt (Electrical) HBJ Hazira-Bijapur-Jagdishpur ( pipeline) HFO Heavy Fuel Oil HEP Hydro Electric Project HPS Heavy Petroleum Stock HRD Human Resource Development HSD High Speed Diesel HT High Tension HVDS High Voltage Distribution System ID Induced Draft IEP Integrated Energy Policy IGCAR Indira Gandhi Centre for Atomic Research282 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] IGCC Integrated Gasification Combined Cycle IISC Indian Institute of Science IIT Indian Institute of Technology IPP Independent Power Producer IS Indian Standard ISCC Integrated Solar Combined Cycle ISO International Standard Organisation ISPLAN Integrated System Planning IT Information Technology kCal kilo Calorie kg kilogram KKNPP Kudankulam Nuclear Power Project kW kilo Watt kWh kilo Watt hour LEP Life Extension Programme LF Load Factor LNG Liquefied Natural Gas LOA Letter of Award LOLP Loss of Load Probability LP Linear Programming LRVI Loss Reduction & Voltage Improvement LSHS Low Sulphur Heavy Stock LT Low Tension LWR Light Water Reactor MAPS Madras Atomic Power Station MCFC Mother Carbonate Fuel Cell Mcm Million cubic metre MHD Magneto Hydro Dynamics MMSCMD Million Metric Standard Cubic Metre per Day MNRE Ministry of New & Renewable Energy MNP Minimum Need Programme MoEF Ministry of Environment & Forest MoP Ministry of Power MT Million Tonne MToe Million Tonnes Oil equivalent MU Million Units MW Mega Watt MWe Mega Watt electric NAPS Narora Atomic Power Station NCPS National Capital Power Station NDT Non-Destructive Test NEP National Electricity Policy NFC Nuclear Fuel Complex NHPC National Hydroelectric Power Corporation¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 283 NMDC National Mineral Development Corporation NML National Metallurgical Laboratory NO Oxides of Nitrogen X NPC National Productivity Council NPCIL Nuclear Power Corporation of India Ltd. NPTI National Power Training Institute NTC Nuclear Training Centre NTPC National Thermal Power Corporation OCGT Open Cycle Gas Turbine OGIP Original Gas In Place O&M Operation & Maintenance PAFC Phosphoric Acid Fuel Cell PC Pulverized Coal PFBC Pressurised Fluidized Bed Combustion PFC Power Finance Corporation PFR Preliminary Feasibility Report PGCIL Power Grid Corporation of India Limited pH Hydrogen Ion Concentration PIE Partnership In Excellence PIB Public Investment Board PHWR Pressurised Heavy Water Reactor PLF Plant Load Factor PMGY Pradhan Mantri Gramodaya Yojna PMI Power Management Institute PMO Prime Minister’s Office PPM Parts Per Million PS Private Sector PSC Production Sharing Contract PSP Power Supply Position PSS Pumped Storage Schemes PSU Public Sector Undertaking. R&D Research & Development R&M Renovation & Modernisation RAPP Rajasthan Atomic Power Project RAPS Rajasthan Atomic Power Station REB Regional Electricity Board REC Rural Electrification Corporation REDB Rural Electricity Distribution Backbone RHE Rural Household Electrification RLA Residual Life Assesment RM Reserve Margin SAARC South Asian Association for Regional Corporation SEB State Electricity Board SERC State Electricity Regulatory Commission284 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] SOG Sanctioned & Ongoing SO Oxides of Sulphur X SPIC Southern Petro India Chemicals Ltd. SPM Suspended Particulate Matter SS State Sector SSB Solid State Breakers SSTS Solid State Transfer Switches STPP Super Thermal Power Plant STPS Super Thermal Power Station STUs State Transmission Utilities T&D Transmission & Distribution TAPP Tarapur Atomic Power Project TAPS Tarapur Atomic Power Station TIFAC Technology Information Forecasting & Assessment Council TOU Time of Use TPS Thermal Power Station UCIL Uranium Corporation of India Ltd. UMPP Ultra Mega Power Project UN United Nations UNDP United Nations Development Programme UT Union Territory VEI Village Electrification Infrastructure WBPDCL West Bengal Power Development Corporation Limited¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 285 Chapter 1 INTRODUCTION 1.0 BACKGROUND Growth of power sector is key to the economic development of our country. Growth in production of electricity has led to its extensive use in all the sectors of economy in the successive five years plans. Over the years the installed capacity of Power Plants (Utilities) has increased to about 1,99,877 MW as on 31.03.2012 from a meagre 1713 MW in 1950. Similarly, the electricity generation increased from about 5.1 Billion units to 877 Billion units in 2011-12. The per capita consumption of electricity in the country also increased from 15 kWh in 1950 to about 819 kWh in 2011. About 95% of the villages have been electrified. However, the country continues to have mismatch between demand and supply and experienced energy and peak shortages to the tune of 8.5% and 10.6% respectively during the year 2011-12. The ongoing RGGVY (Rajiv Gandhi Gram Vidyuthikaran Yojana) envisages access to electricity to households in rural areas. The per capita electricity consumption in India is 24% of the world’s average and 35% & 28% respectively that of China and Brazil. 1.1 ELECTRICITY ACT 2003 AND NATIONAL ELECTRICITY POLICY 1.1.1 Electricity Act 2003 and Stipulations regarding National Electricity Plan The Electricity Act, 2003 provides an enabling legislation conducive to development of the Power Sector in transparent and competitive environment, keeping in view the interest of the consumers. As per Section 3(4) of the Electricity Act 2003, CEA is required to prepare a National Electricity Plan in accordance with the National Electricity Policy and notify such Plan once in five years. The draft plan has to be published and suggestions and objections invited thereon from licensees, generating companies and the public within the prescribed time. The Plan has to be notified after obtaining the approval of the Central Government. The National Electricity Policy stipulates that the Plan prepared by CEA and approved by the Central Government can be used by prospective generating companies, transmission utilities and transmission/distribution licensees as reference document. 1.1.2 National Electricity Policy and Stipulations regarding National Electricity Plan The Aims and Objectives of the National Electricity Policy are as follows: • Access to Electricity - Available for all households in next five years • Availability of Power - Demand to be fully met by 2012. Energy and peaking shortages to be overcome and adequate spinning reserve to be available. • Supply of Reliable and Quality Power of specified standards in an efficient manner and at reasonable rates. • Per capita availability of electricity to be increased to over 1000 units by 2012. • Minimum lifeline consumption of 1 unit/household/day as a merit good by year 2012. • Financial Turnaround and Commercial Viability of Electricity Sector. • Protection of consumers’ interests. As per the Policy, the National Electricity Plan would be for a short-term framework of five years while giving a 15 year perspective and would include: • Short-term and long term demand forecast for different regions;286 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] • Suggested areas/locations for capacity additions in generation and transmission keeping in view the economics of generation and transmission, losses in the system, load centre requirements, grid stability, security of supply, quality of power including voltage profile, etc; and environmental considerations including rehabilitation and resettlement; • Integration of such possible locations with transmission system and development of national grid including type of transmission systems and requirement of redundancies; and • Different technologies available for efficient generation, transmission and distribution. • Fuel choices based on economy, energy security and environmental considerations. The Policy also stipulates that while evolving the National Electricity Plan, CEA will consult all the stakeholders including state governments and the state governments would, at state level, undertake this exercise in coordination with stakeholders including distribution licensees and STUs. While conducting studies periodically to assess short-term and long-term demand, projections made by distribution utilities would be given due weightage. CEA will also interact with institutions and agencies having economic expertise, particularly in the field of demand forecasting. Projected growth rates for different sectors of the economy will also be taken into account in the exercise of demand forecasting. The Policy stipulates that in addition to enhancing the overall availability of installed capacity to 85%, a spinning reserve of at least 5% at national level would need to be created to ensure grid security and quality and reliability of power supply. The Policy states that efficient technologies, like super-critical technology, IGCC etc; and large size units would be gradually introduced for generation of electricity as their cost effectiveness gets established. 1.2 VARIOUS INITIATIVES OF THE GOVERNMENT 1.2.1 Development of Power Projects on Tariff Based Bidding Promotion of competition in the electricity industry in India is one of the key objectives of the Electricity Act, 2003 (the Act). Competitive procurement of electricity by the distribution licensees is expected to reduce the overall cost of procurement of power and facilitate development of power markets. Section 61 & 62 of the Act provide for tariff regulation and determination of tariff of generation, transmission, wheeling and retail sale of electricity by the Appropriate Commission. Section 63 of the Act states that – “Notwithstanding anything contained in Section 62, the Appropriate Commission shall adopt the tariff if such tariff has been determined through transparent process of bidding in accordance with the guidelines issued by the Central Government.” Tariff Policy was issued on 5th January, 2006 to facilitate procurement of power on tariff based bidding. As per the new Tariff Policy notified by GOI in January,2006, All DISCOMS are required compulsorily to procure power on competitive Tariff based bidding w.e.f from 6th January,2011. Power projects can be developed by States under Case I and Case II bidding as follows: (i) Where the location, technology or fuel is not specified by the procurer (Case 1); (ii) For hydro-power projects, load centre projects or other location specific projects with specific fuel allocation such as captive mines available, which the procurer intends to set up under tariff based bidding process (Case 2). Guidelines for procurement of Power by Distribution licensees and Standard Bidding Documents have been issued by the Ministry of Power. Many projects in Haryana, UP, Gujarat, Maharashtra etc, are being implemented through tariff based competitive bidding (Case 1/Case 2).¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 287 1.2.2 Development of Ultra Mega Projects An Initiative has been launched by the Government for the development of coal based Ultra Mega Power Projects (UMPPs) of about 4,000 MW capacity each under Tariff based competitive bidding. The UMPPs will be located either at pit head based on domestic coal or at coastal locations based on imported coal. For UMPPs based on domestic coal, coal block will also be allocated to the project developer. The Objective is to achieve faster capacity addition and to minimize the cost of power to consumers due to economy of scale. Four UMPPs have already been awarded to the developers selected through tariff based competitive bidding. The UMPPs already transferred are Mundra UMPP in Gujarat, Sasan UMPP in MP, Krishnapatnam UMPP in AP and Tilaiya UMPP in Jharkhand. For the Mundra & Sasan UMPPs construction work has started. The First and Second Unit of 800 MW each of Mundra UMPP were synchronized on 8.1.2012 and 10.7.2012 respectively and achieved Commercial operation on 7th March, 2012 and 30th July, 2012 respectively. Third unit of 800 MW of Mundra UMPP was synchronized on 6-10-2012. Remaining two Units of 800 MW each of Mundra UMPP and all the six unit of 660 MW of Sasan UMPP are expected to be commissioned in 12th Plan. For Tilaiya UMPP, land acquisition and preliminary works are under progress. Five units of 660 MW of Tilaiya UMPP are scheduled for commissioning during the 12th Plan and one unit of 660 MW in 13th Plan. The developer of Krishnapatnam Ultra Mega Power Project, namely M/s Coastal Andhra Power Ltd. had started the construction work but have since stopped the construction work citing new regulation of the Govt. of Indonesia as the reason which prohibits sale of coal, including sale to affiliate companies, below bench mark price. APSPDCL, the lead procurer, has issued termination notice to CAPL. CAPL had approached the High Court of Delhi. The Delhi High Court has dismissed the petition of CAPL on 2.7.2012. CAPL has approached Division Bench, Delhi High Court as well as Indian Arbitrator Council for Arbitration. The matter is subjudice. In addition to nine UMPPs originally identified, request has come from some of the state governments for installation of additional UMPPs in their states. These are given below: i) Second UMPP in Andhra Pradesh- 4000 MW ii) Two Additional UMPPs of 4000 MW each in Orissa iii) Second UMPP in Gujarat- 4000 MW- iv) Second UMPP in Jharkhand.- 4000 MW v) Second UMPP in Tamilnadu. - 4000 MW vi) UMPP in Bihar-4000 MW The selection/investigation of sites for the above mentioned additional UMPPs are in process in consultaiton with the concerned State Goverments. The status of nine UMPPs originally envisaged & additional seven UMPPs is enclosed at Annexure 1.1. 1.2.3 Allocation of Captive Coal Blocks The coal production in the country has not been keeping pace with the increasing demand of the Power Sector due to various reasons, major one being delay in development of coal mines in the country. This has necessitated the need to import coal. Moreover, due to significant capacity addition achieved in 11th Plan and huge capacity addition programme during 12th Plan and beyond as compared to the actual capacity addition during the past few Plan periods has further aggravated the situation and the gap between demand and supply of domestic coal has widened. Therefore, it has been decided to allocate coal blocks to project developers for captive use. All UMPPs at pithead have been allocated coal blocks. The number of coal blocks allocated to various utilities and the geological reserves of the blocks are given in Table 1.1 below:288 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Table: 1.1 Details of Captive Coal Blocks Allocation to Power Sector Utility Coal Blocks Geological Reserves (MT) CPSU 14 7752 State Utilities 45 13566.88 UMPPs 10 4520.91 Private 19 3754.03 Total 88 29593.22 16 blocks having production capacity of 45.15 million tonnes per annum are under operation. Mining Plan has been approved for 36 blocks (reserve- 12659 MT). The captive mine blocks have to be developed on priority to meet the capacity addition targets for the 12th plan. 1.2.4 New Hydro Policy With a view to ensure accelerated development of the hydro power, a New Hydro Policy has been announced by the Government. As per this Policy, the State Governments would be required to follow a transparent procedure for awarding potential sites to the private sector. The concerned private developer would be required to follow the existing procedure such as getting DPR prepared and other statutory clearances and then approach the appropriate regulator for fixation of tariff of the project. Merchant sale of power is to reduce with delay in commissioning of the projects. Provisions have also been made for providing incentives for local area development fund and project affected families. New Hydro Policy enables developer to recover his additional costs through merchant sale of upto a maximum of 40% of the saleable energy. Further, 1% free power from the project is to be allocated for Local Area Development for welfare schemes, creation of additional infrastructure and common facilities. The State Governments are also expected to contribute a matching 1% from their share of 12% free power for local area development. 1.2.5 Private Sector Participation in Transmission Sector The Inter-state transmission sector was opened up for private sector participation through joint venture with POWERGRID and through selection of Transmission System Provider(TSP) through competitive bidding. Transmission is a licensed activity and PGCIL as the Central Transmission Utility is a deemed licensee. Therefore, the Central Regulatory Commission had to be approached by the joint venture (JV) companies for grant of transmission license. Torrent Powergrid Company Ltd., Jaypee Powergrid Ltd., Parbati Koldam Transmission Co. Ltd., Teesta Valley Power Transmission Ltd. and North-East Transmission Co. Ltd. were granted licenses for purpose of developing specific transmission projects. Subsequently, MoP issued Guidelines for Encouraging Competition in Development of Transmission Projects and Tariff based Competitive Bidding Guidelines for Transmission Services, as well as Standard Bid Documents for procuring transmission services through the market route. While selecting the transmission projects for competitive bidding, the lead time requirement of about one year for completing the bidding process has to be kept in view. The scope has to be frozen before RFP stage as no modification is possible after invitation of the tariff bids. The transmission service provider selected through tariff based competitive bidding subsequently takes over the SPV company and then has to approach CERC for grant of transmission license and acceptance of market discovered tariff by the Commission, and in the meanwhile also has to achieve financial closure.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 289 MoP has constituted an Empowered Committee headed by Member, CERC for identifying projects to be implemented through competitive bidding and providing guidance to the Bid Process Coordinator. MoP has appointed REC and PFC as Bid Process Coordinator. Ten Inter-State Transmission projects are presently under implementation through competitive bidding route. Two of them are assigned to POWERGRID and the remaining are being implemented by private companies. 1.2.6 National Action Plan for Climate Change The National Action Plan for Climate Change (NAPCC) was launched by the Prime Minister in June 2008. NAPCC seeks to promote sustainable development through use of clean technologies. The Plan aims to limit India’s greenhouse gas emissions to less than that of developed countries. The Plan will be implemented thorough eight missions which represent multi-pronged, long-term and integrated strategies for achieving key goals in the context of climate change. The stated objective is to establish an effective, cooperative and equitable global approach based on the principle of common but differentiated responsibilities and relative capabilities enshrined in the UNFCC. Success of India’s efforts would be enhanced if the developed nations fulfil their commitments under UNFCC to transfer additional financial resources and climate friendly technologies to the developing countries. NAPCC identifies following eight National Missions • National Solar Mission • National Mission for Enhanced Energy Efficiency • National Mission on Sustainable Habitat • National Water Mission • National Mission for sustaining the Himalayan Ecosystem • National Mission for a “Green India” • National Mission for sustainable Agriculture • National Mission on Strategic Knowledge for Climate Change Jawaharlal Nehru National Solar Mission - Towards Building SOLAR INDIA The National Solar Mission is a major initiative of the Government of India and State Governments to promote ecologically sustainable growth while addressing India’s energy security challenge. It will also constitute a major contribution by India to the global effort to meet the challenges of climate change. The objective of the National Solar Mission is to establish India as a global leader in solar energy, by creating the policy conditions for its diffusion across the country as quickly as possible. The Mission was to adopt a 3-phase approach, spanning the remaining period of the 11th Plan and first year of the 12th Plan (up to 2012-13) as Phase 1, the remaining 4 years of the 12th Plan (2013-17) as Phase 2 and the 13th Plan (2017- 22) as Phase 3. At the end of each plan, and mid-term during the 12th and 13th Plans, there will be an evaluation of progress, review of capacity and targets for subsequent phases, based on emerging cost and technology trends, both domestic and global. The aim would be to protect Government from subsidy exposure in case expected cost reduction does not materialize or is more rapid than expected. The immediate aim of the Mission is to focus on setting up an enabling environment for solar technology penetration in the country both at a centralized and decentralized level. The first phase (up to 2013) will focus on capturing of the low-hanging options in solar thermal; on promoting off-grid systems to serve populations without access to commercial energy and modest capacity addition in grid-based systems. In the second phase, after taking into account the experience of the initial years, capacity will be aggressively ramped up to create conditions for up scaled and competitive solar energy penetration in the country.290 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] To achieve this, the Mission targets are: • To create an enabling policy framework for the deployment of 20,000 MW of solar power by 2022. • To ramp up capacity of grid-connected solar power generation to 1000 MW within three years – by 2013; an additional 3000 MW by 2017 through the mandatory use of the renewable purchase obligation by utilities backed with a preferential tariff. This capacity can be more than doubled – reaching 10,000MW installed power by 2017 or more, based on the enhanced and enabled international finance and technology transfer. The ambitious target for 2022 of 20,000 MW or more, will be dependent on the ‘learning’ of the first two phases, which if successful, could lead to conditions of grid-competitive solar power. The transition could be appropriately up scaled, based on availability of international finance and technology. • To create favourable conditions for solar manufacturing capability, particularly solar thermal for indigenous production and market leadership. • To promote programmes for off grid applications, reaching 10000 MW by 2017 and 20000 MW by 2022. • To achieve 15 million sq. meters solar thermal collector area by 2017 and 20 million by 2022. • To deploy 20 million solar lighting systems for rural areas by 2022. Strategy for implementation of first phase of 1300 MW • Bundling of 1000 MW with unallocated power. • Roof top reimbursement to states. 1.2.7 Restructured Accelerated Power Development and Reform Programme (R-APDRP) during XI Plan (2007-12) The Govt. of India has accorded sanction to implement Restructured Accelerated Power Development and Reform Programme (R-APDRP) during the 11TH Plan with revised terms and conditions as a Central Sector Scheme. The focus of the programme is on actual, demonstrable performance in terms of sustained loss reduction. Restructured APDRP was approved with an outlay of Rs. 51,577 crore. It is proposed to cover urban areas - towns and cities with population of more than 30,000 (10,000 in case of special category states). In addition, in certain high-load density rural areas with significant loads, works of separation of agricultural feeders from domestic and industrial ones, and of High Voltage Distribution System (11kV) will also be taken up. Further, towns / areas for which projects have been sanctioned in X Plan R-APDRP shall be considered for the XI Plan only after either completion or short closure of the earlier sanctioned projects. Projects under the scheme shall be taken up in Two Parts. Part-A shall include the projects for establishment of baseline data and IT applications for energy accounting/auditing & IT based consumer service centres and Part-B shall include regular distribution strengthening projects. Power Finance Corporation (PFC) as nodal agency for R-APDRP in XI plan will provide necessary assistance for smooth implementation of programme. 1.2.8 Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Central Govt. has launched Rajiv Gandhi Grameen Vidyutikaran Yojana of Rural Electricity Infrastructure and Household Electrification on 4th April, 2005 for the attainment of the National Common Minimum Programme (NCMP) goal for providing access to electricity to all households in five years. The scheme aims at electrification of 125,000 un-electrified villages and un-electrified hamlets and electrification of 7.8 crore households. The estimated¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 291 cost of the scheme (including XI Plan) was Rs.16000 crores approximately and Rs.5000 crores were earmarked for capital subsidy in phase- I during the 10th Plan Period. Under the scheme 90% capital subsidy would be provided for overall cost of the project for provision of: • Rural Electricity Infrastructure Backbone (REDB) with at least one 33/11 KV(or 66/11 KV) substation in each block • Village Electrification Infrastructure (VEI) with at least one distribution transformer in each village/habitation • Decentralized Distribution Generation (DDG) System where grid supply is either not feasible or not cost effective. Guidelines for village electrification through Decentralized Distributed Generation (DDG) under RGGVY in the XI plan have been approved and circulated vide OM No.44/1/2007-RE dated 12th January,2009. Government of India has approved the continuation of the scheme in 11th Plan for attaining the goal of providing access to electricity to all households, electrification of about 1.15 lakh unelectrified villages and electricity connections to 2.34 crore BPL households by 2012 with a capital subsidy of Rs. 28,000 crores . Further, RGGVY is to be continued during 12th Plan as well. 1.2.9 Augmentation of Indigenous Equipment Manufacturing Capacity All efforts have been made to ensure that manufacturing capacity for Main Plant equipment in the country is suitably enhanced to meet capacity addition requirement during 11th Plan and beyond by enhancing manufacturing capability of existing manufacturers and by encouraging new vendors. Based on the encouragement from Government of India for setting up domestic manufacturing facilities, a number of new manufacturers have come forward for setting up manufacturing facilities for Steam Generators and Turbine Generators. These include: 1. L&T-MHI 2. Toshiba-JSW 3. Alstom-Bharat Forge 4. Gammon - Ansaldo 5. BGR-Hitachi 6. Doosan 7. Thermax-Babcock 8. Cethar Vessel- Riley Power With above collaborations it may be concluded that country have sufficient manufacturing capability for main plant equipments CEA has already reviewed the Pre-qualification requirement of suppliers of Super Critical boilers and turbine- generators to facilitate entry of new players and has recommended the same for adoption by central and state power utilities. In order to promote indigenous manufacturing and transfer of technology of super critical technology, bulk tendering of 11 units of 660 MW with super critical technology for NTPC & DVC projects has been initiated with mandatory phased indigenous manufacturing. An assessment of requirement of Balance of Plant equipment for power plants has also been carried out and efforts are being made to enhance the manufacturing capacity of existing vendors and encourage new vendors also.292 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] It is necessary to sensitize the industry about the long term requirement of BoPs for the power sector to attract investment in BoP segment. Ministry of Power and CEA have already taken an initiative in coordination with CII to sensitize the industry about the requirement of BoPs. BoP is not a high technology area and a vendor having experience of executing other infrastructure project could also develop BoP execution capabilities. This has been considered to avoid the overburdening the existing BoP manufacturers. CEA has already reviewed the pre-qualification requirement for BoP vendors and the pre-qualification report for the various BoP packages has been finalised by CEA in consultation with the stakeholders. The recommendations of CEA have been forwarded to all state and central power utilities for adoption. 1.2.10 Demand Side Management Initiatives by BEE Recognizing the fact that efficient use of energy and its conservation is the least-cost option to mitigate the gap between demand and supply, Government of India has enacted the Energy Conservation (EC) Act – 2001 and established Bureau of Energy Efficiency (BEE). The Act provides for institutionalizing and strengthening delivery mechanism for energy efficiency services in the country and provides the much-needed coordination between the various entities. The Bureau would be responsible for implementation of policy programmes and co-ordination of implementation of energy conservation activities. The mission of BEE is to develop policy and strategies with a thrust on self- regulation and market principles, within the overall framework of the EC Act with the primary objective of reducing energy intensity of the Indian economy. Mandatory Provisions of the EC Act • Strengthening energy management and energy auditing capabilities of energy professionals • Accreditation of energy auditors • Fixation of norms for different industrial sectors • Conduction of Mandatory energy audits by designated consumers • Notification of State Designated Agencies • Standards & Labelling for notified energy consuming equipment and appliances • Energy Conservation Building Codes for new commercial buildings having connected load of 500 kW or more PROGRAMME AND MEASURES Bureau of Energy Efficiency (BEE) has already identified thrust areas and prepared a detailed Action Plan listing out associated activities to be carried out by it for implementing projects and programmes to promote efficient use of energy and its conservation. The Action Plan was launched by the Honourable Prime Minister on 23rdAugust, 2002 at the International Conference on Strategies for Energy Conservation in New Millennium held in New Delhi. The Action Plan, inter-alia, covers: • Indian Industry Program for Energy Conservation • Demand Side Management • Standards and Labelling program • Energy efficiency in buildings and establishments¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 293 • Energy conservation building codes • Professional certification and accreditation • Manuals and codes • Energy efficiency policy research program • Delivery Mechanisms for energy Services • School education etc. 1.2.11 Human Resource Development – Adopt an ITI scheme To meet the manpower requirement during the 11th Plan and beyond, high priority is being accorded to human resource development and training of power sector personnel. A very comprehensive and pragmatic approach has been adopted to attract, utilize, develop and conserve valuable human resources. It has been estimated that an additional about 1 million workmen, supervisors and engineers would be required for Construction, Operation and Maintenance of power equipment during 12th Plan. In particular, technicians of specified skills would be required in very large numbers. To bridge the gap between supply and demand, a scheme called “Adopt an ITI” has been initiated with a view to building up of skilled work force in the vicinity of the project. Even though we have adequate ITIs, the infrastructure available in terms of workshop facilities and faculty is inadequate. It is required to be strengthened to produce quality technicians. As per this scheme, ITIs are to be adopted or new ITI established by power developers in the vicinity of their projects to provide opportunity to local population to develop skill in construction and O & M of the power projects. Central Public Sector Undertakings have already adopted some ITIs. Private sector is also being encouraged to help in developing large skilled workforce required for accelerated development of power sector. 1.2.12 Creation of National Electricity Fund(NEF) for Distribution Scheme Investment in Sub-transmission and distribution has been lacking due to resource crunch being experienced by the State transmission and distribution utilities. The break-up of the generation and transmission & distribution schemes shall normally be 50:50. However, more investment is taking place in generation and investment in intra-state transmission system and distribution System has been much less than the desired proportion. The National Electricity Fund (NEF) has been created for providing financial support to State Power Utilities for improving their transmission & distribution infrastructure. 1.2.13 IT Based Project Monitoring Monitoring of construction of Power Projects is very complex due to a number of activities being taken up simultaneously and in parallel. It is no longer possible to carry out monitoring of progress of execution of a power project by manual system. IT based monitoring has been promoted to have effective monitoring system. Only a few projects being undertaken in 11th Plan are presently being monitored through IT based system which gives day to day progress of the project. This needs to be replicated in all ongoing projects to identify bottlenecks and to take timely action for removal of hurdles in project execution. 1.3 POWER PLANNING BY CEA Central Electricity Authority (CEA) was established under Section 3 of the Electricity (Supply) Act 1948 and it has continued to exercise the functions and perform duties as assigned to it under the Electricity Act 2003. CEA is responsible for overall planning & development of the Power Sector in the country. CEA is a technical organization to advise and assist the central government on matters relating to generation, transmission, distribution, trading and utilization of electricity. CEA has also been entrusted with the responsibility of advising Central and State Regulatory Commissions, State Governments, licensees, generating companies on any matter on which advice is sought or on any matter which shall enable them to operate the electrical system efficiently. Certain other functions as entrusted to CEA as per Electricity Act 2003, include specifying technical standards for construction of electrical plants; safety requirements for construction, operation and maintenance of electrical plants & lines; grid standards for operation and294 THE GGAAZZEETTTTEE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] mmmaaaiiinnnttteeennnaaannnccceee ooofff tttrrraaannnsssmmmiiissssssiiiooonnn llliiinnneeesss aaannnddd ttthhheee cccooonnndddiiitttiiiooonnnsss fffooorrr iiinnnssstttaaallllllaaatttiiiooonnn ooofff mmmeeettteeerrrsss fffooorrr tttrrraaannnsssmmmiiissssssiiiooonnn aaannnddd sssuuupppppplllyyy ooofff electricity. 1.4 NATIONAL ELECTRICITY PPLLAANN FFOORR 1111TH PLAN TThhee NNaattiioonnaall EElleeccttrriicciittyy PPllaann ccoovveerriinngg tthhee rreevviieeww ooff 1100th Plan, detailed plan for 11th ppllaann aanndd ppeerrssppeeccttiivvee ppllaann ffoorr 1122th PPPlllaaannn wwwaaasss ppprrreeepppaaarrreeeddd bbbyyy CCCEEEAAA iiinnn NNNooovvveeemmmbbbeeerrr 222000000444 aaannnddd wwwaaasss ccciiirrrcccuuulllaaattteeeddd tttooo aaallllll ssstttaaakkkeeehhhooollldddeeerrrsss aaasss wwweeellllll aaasss pppuuuttt uuuppp ooonnn ttthhheee CCCEEEAAA WWWeeebbbsssiiittteee iiinnnvvviiitttiiinnnggg cccooommmmmmeeennntttsss bbbyyy 111555ttthhh MMMaaarrrccchhh 222000000555,,, lllaaattteeerrr eeexxxttteeennndddeeeddd tttooo 111555ttthhh AAAppprrriiilll 222000000555... CCCEEEAAA rrreeeccceeeiiivvveeeddd cccooommmmmmeeennntttsss ooonnn dddrrraaafffttt National Electricity Plan from varrriiiooouuusss ssstttaaakkkeeehhhooollldddeeerrrsss... AAAfffttteeerrr tttaaakkkiiinnnggg iiinnn tttooo cccooonnnsssiiidddeeerrraaatttiiiooonnn vvvaaarrriiiooouuusss cccooommmmmmeeennntttsss aaannnddd sssuuuggggggeeessstttiiiooonnn rrreeeccceeeiiivvveeeddd fffrrrooommm vvvaaarrriiiooouuusss ssstttaaakkkeeehhhooollldddeeerrrsss,,, ttthhheee ppplllaaannn wwwaaasss fffiiinnnaaallliiissseeeddd bbbyyy ttthhheee AAAuuuttthhhooorrriiitttyyy... TTThhheee PPPlllaaannn wwwaaasss fffiiinnnaaallllllyyy aaapppppprrrooovvveeeddd bbbyyy GGoovveerrnnmmeenntt iinn JJuullyy,, 22000077 aanndd iitt wwaass nnoottiiffiieedd iinn tthhee GGaazzeettttee ooff IInnddiiaa vviiddee ggaazzeettttee NNoo..115599 ddaatteedd 33rrdd AAuugguusstt,, 22000077.. AA rreevviieeww ooff tthhee PPllaann iiss ggiivveenn iinn tthhee nneexxtt CChhaapptteerr.. 11..55 PPRREESSEENNTT PPOOWWEERR SSCCEENNAARRIIOO IINN TTHHEE CCOOUUNNTTRRYY Installed Capacity TThhee IInnssttaalllleedd CCaappaacciittyy ooff tthhee ccoouunnttrryy aass oonn 3311sstt MMaarrcchh,, 22001122 wwaass 11,,9999,,887777 MMWW aass ddeeppiicctteedd iinn tthhee Exhibit 1.1 as follows: EExxhhiibbiitt 11..11 – All India Installed Capacity (as on 31st MMaarrcchh,, 22001122)) **TThhee pprreesseenntt IInnssttaalllleedd CCaappaacciittyy ooff tthhee ccoouunnttrryy aass oonn 3311..1100..22001122 iiss 22,,0099,,227766 MMWW TThhee ccoouunnttrryy hhaass ssiiggnniiffiiccaanntt ppootteennttiiaall ooff ggeenneerraattiioonn ffrroomm rreenneewwaabbllee eenneerrggyy ssoouurrcceess.. AAllll eeffffoorrttss aarree bbeeiinngg ttaakkeenn bbyy GGoovveerrnnmmeenntt ooff IInnddiiaa ttoo hhaarrnneessss tthhiiss ppootteennttiiaall.. TThhee IInnssttaalllleedd ccaappaacciittyy aass oonn 3311st MMaarrcchh,, 22001122 ffrroomm rreenneewwaabbllee eenneerrggyy sources is 24,503 MMMWWW... TTThhheee TTToootttaaalll RRReeennneeewwwaaabbbllleee IIInnnssstttaaalllllleeeddd CCCaaapppaaaccciiitttyyy cccooommmppprrriiissseeesss ooofff 111666888999666...666 MMMWWW fffrrrooommm WWWiiinnnddd,,, 333444111000...555222 MMMWWW fffrrrooommm SSSmmmaaallllll HHHyyydddrrrooo PPPlllaaannntttsss,,, 333222555555...000111 MMMWWW fffrrrooommm BBBiiiooommmaaassssss PPPooowwweeerrr &&& BBBiiiooommmaaassssss GGGaaasssiiifffiiieeerrrsss aaannnddd 999444111...333111 MMMWWW fffrrrooommm SSSooolllaaarrr pppooowwweeerrr && UUrrbbaann && IInndduussttrriiaall wwaassttee.. IInnddiiaa rraannkkss ffiifftthh iinn tthhee wwoorrlldd iinn tteerrmmss ooff iinnssttaalllleedd ccaappaacciittyy ooff wwiinndd ttuurrbbiinnee ppoowweerr ppllaannttss..¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 295 Exhibit 1.2 AAllll IInnddiiaa IInnssttaalllleedd CCaappaacciittyy ((RReenneewwaabbllee)) AAss oonn 3311st MMaarrcchh,, 22001122 TTThhheee gggrrrooowwwttthhh ooofff IIInnnssstttaaalllllleeeddd CCCaaapppaaaccciiitttyyy aaannnddd GGGeeennneeerrraaatttiiiooonnn iiinnn IIInnndddiiiaaa fffrrrooommm vvvaaarrriiiooouuusss sssooouuurrrccceeesss iiisss ssshhhooowwwnnn iiinnn Exhibit 1.3, 1.4 & Table 1.2 below: Table 1.2 Growth of Electricity Generation Plan/Year GGeenneerraattiioonn Growth rate in (%) CCoommppoouunndd GGrroowwtthh ((%%)) 8th Plan 1992-93 330011..0077 5.0 6.61 1993-94 332233..5533 7.5 1994-95 335511..0033 8.5 1995-96 338800..0088 8.3 1996-97 339944..8800 3.9 9th Plan 1997-98 442200..6622 6.5 5.47 1998-99 444488..3377 6.6 1999-2000 448800..6688 7.2 2000-01 449999..5555 3.9 2001-02 551155..2255 3.1 10th Plan 2002-03 553311..6611 3.2 5.16 2003-04 555588..3344 5.0 2004-05 558877..4422 5.2 2005-06 661177..5511 5.1 2006-07 666622..5522 7.3 11th Plan 2007-08 770044..4477 6.3 5.77 2008-09 772233..7799 2.7 2009-10 777711..6600 6.6 2010-11 881111..1100 5.1 2011-12 887777..0000 8.1296 THE GGAAZZEETTTTEE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Exhibit 1.3 Exhibit 1.4 Presently (2011-111222))) cccoooaaalll bbbaaassseeeddd cccaaapppaaaccciiitttyyy cccooonnntttrrriiibbbuuuttteeesss mmmaaajjjooorrr pppaaarrrttt ooofff ttthhheee iiinnnssstttaaalllllleeeddd cccaaapppaaaccciiitttyyy (((555777 %%%))) aaannnddd cccooonnntttrrriiibbbuuuttteeesss tttooo aaabbbooouuuttt 70 % of ttthhheee tttoootttaaalll eeennneeerrrgggyyy gggeeennneeerrraaatttiiiooonnn... IIInnn aaaddddddiiitttiiiooonnn tttooo aaabbbooovvveee,,, ttthhheee iiinnnssstttaaalllllleeeddd cccaaapppaaaccciiitttyyy ooofff cccaaappptttiiivvveee pppooowwweeerrr ppplllaaannntttsss ooofff 111MMMWWW aaannnddd aabboovvee iiss ooff tthhee oorrddeerr ooff 3366,, 551111 MMWW aatt tthhee eenndd ooff 22001111-1122..TThhee eenneerrggyy ggeenneerraatteedd ffrroomm ccaappttiivvee ppoowweerr ppllaannttss dduurriinngg tthhee year 2010-11 was 114.2 BU. Actual Power Supply Position TTThhheee cccooouuunnntttrrryyy hhhaaasss bbbeeeeeennn fffaaaccciiinnnggg gggrrrooowwwiiinnnggg ssshhhooorrrtttaaagggeeesss ooovvveeerrr ttthhheee pppaaasssttt fffiiivvveee yyyeeeaaarrrsss... DDDuuurrriiinnnggg ttthhheee yyyeeeaaarrr 222000000777-08 (1st year of 11th PPPlllaaannn))),,, ttthhheee pppeeeaaakkk dddeeefffiiiccciiittt wwwaaasss aaabbbooouuuttt 111888,,,000000000 MMMWWW (((111666...555%%%))) aaannnddd ttthhheee aaavvveeerrraaagggeee eeennneeerrrgggyyy ssshhhooorrrtttaaagggeee iiinnn ttthhheee cccooouuunnntttrrryyy wwwaaasss aaabbbooouuuttt 777888 Billioonn kkWWhh ((1111%%)).. DDuurriinngg tthhee yyeeaarr 22000088-09 (2nd yyeeaarr ooff 1111tthh PPllaann)),, tthhee ppeeaakk ddeeffiicciitt wwaass aabboouutt 1133,,000000 MMWW ((1122%%)) aanndd ttthhheee aaavvveeerrraaagggeee eeennneeerrrgggyyy ssshhhooorrrtttaaagggeee iiinnn ttthhheee cccooouuunnntttrrryyy wwwaaasss aaabbbooouuuttt 888666 BBBiiilllllliiiooonnn kkkWWWhhh (((111111%%%)))... DDDuuurrriiinnnggg ttthhheee yyyeeeaaarrr 222000000999-10 (3rd year of 11th Plan), the peak deficit was aaabbbooouuuttt 111555,,,111555777 MMMWWW (((111333...888%%%))) aaannnddd ttthhheee aaavvveeerrraaagggeee eeennneeerrrgggyyy ssshhhooorrrtttaaagggeee iiinnn ttthhheee cccooouuunnntttrrryyy wwwaaasss aaabbbooouuuttt 888444 BBiilllliioonn kkWWhh ((1100..11%%)).. DDuurriinngg tthhee yyeeaarr 22001100-11 (4th yyeeaarr ooff 1111tthh PPllaann)),, tthhee ppeeaakk ddeeffiicciitt wwaass aabboouutt 1122,,003311 MMWW ((99..88%%))¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 297 and the average energy shortage in the country was about 73 Billion kWh (8.5 %). The power supply position in the country during terminal year of 11th Plan (2011-12) is summarized in Table 1.3 below: Table 1.3 All-India Actual Power Supply Position (2011-12) (April, 2011- March, 2012) Peak (MW) Energy (Billion kWh) Requirement 1,30,006 937 Availability 1,16,191 857 (-) Shortage/(+) Surplus (-) 13,815 (-) 79 (%) (-) 10.6% (-) 8.5 % The details of peak and energy shortages in the country at the end of 7th, 8th, 9th, 10th and 11th Plans are given in Table 1.4 below. Table 1.4 Details of Power Supply Position during Past Plans Region/ Peak Peak Surplus/ Surplus/ Energy Energy Surplus/ Surplus/ State/ Demand Avail- Deficit Deficit Require- Avail- Deficit Deficit U.T. (MW) ability (MW) (%) ment ability (Mu) (%) (MW) (Mu) (Mu) At the End of 7th Plan 40385 33658 -6727 -16.7 247762 228151 -19611 -7.9 (1989-90) At the end of 8th Plan 63853 52376 -11477 -18.0 413490 365900 -47590 -11.5 (1996-97) At the end of 9th Plan 78441 69189 -9252 -11.8 522537 483350 -39187 -7.5 (2001-02) At the End of 10th Plan 100715 86818 -13897 -13.8 690587 624495 -66092 -9.6 (2006-07) 11th Plan 2007-08 108866 90793 -18073 -16.6 705724 628016 -77708 -11.0 2008-09 109809 96685 -13124 -12.0 774,324 689,021 -85,303 -11.0 2009-10 119166 104009 -15157 -13.8 830594 746644 -83950 -10.1 2010-11 122287 110256 -12031 -9.8 861591 788355 -73236 -8.5 2011-12 1,30,006 1,16,191 -13,815 -10.6 9,37,199 8,57,886 -79,313 -8.5 Annual Electric Load Factor The Annual Electric Load Factor is the ratio of the energy availability in the system to the energy that would have been required during the year if the annual peak load met was incident on the system through out the year. This factor depends on the pattern of Utilization of different categories of load. The Annual Electric Load factor has remained close to 80% since 2000-01, primarily because of prevailing shortages in the system and the load staggering measure adopted in the various states particularly staggered supply to agriculture in groups. Since the shortages are rising, the Annual Electric Load Factor also illustrates an increasing trend and is depicted in the Exhibit 1.5 as follows:298 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Exhibit 1.5 Variation of System Load Factor System Load Factor (%) 86 84.29 83.74 84 81.95 81.3 82 82.11 79.99 79.39 80 81.51 81.62 80.33 78 79.75 79.01 2000-012001-022002-032003-042004-052005-062006-072007-082008-092009-102010-112011-12 Reserve Margin and Hydro Thermal Mix Reserve margin of a System is defined as the difference between the Installed Capacity and the peak load met as a percentage of the Peak load met. This factor depends on a number of parameters, major ones being the mode of power generation i.e. hydro, thermal and renewable and the availability of the generating stations. Reserve Margin in other countries varies from 16% to 75%. The Hydro thermal mix in generation has marginally increased from 25.4% in 2001-02 to about 27.82 % as on 31st March 2007 and thereafter has been decreasing and stands at 22.23 as on 31st March, 2012. This is mainly due to large thermal capacity addition during 11th Plan. However the Reserve Margin has decreased from 49.47% in 2001-02 to 38.33 % in 2009-10 and again increased to 50.94 % by year 2011-12. This is illustrated in the Exhibit 1.6 below: Exhibit 1.6 Variation of Reserve Margin and Hydro Thermal Mix 55 50.94 49.47 48.5 50 45.32 43.44 43.48 45 40 45.46 38.33 40.74 39.2 35 38.74 30 26.78 27.82 27.35 25.62 24.21 25 22.23 27 27.37 27.22 20 25.4 25.19 % Variation of Reserve Margin and Hydro Thermal Mix Reserve Margin (excluding Renewables) RM % Hydro Thermal Mix (Excl RES)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 299 This reduction in Reserve Margin is on account of increase in thermal PLF from 69.9 % in 2001-02 to 73.32 % in 2011-12 on account of improvement in technology and O&M practices and higher efficiency parameters of thermal machines. The highest reserve margin so far during 2011-12, indicates large thermal capacities are unable to operate at full capacity due to fuel shortage. This is illustrated in the Exhibit 1.7 below: Exhibit1.7 Variation of Reserve Margin & PLF 90 80 74.8 76.8 78.6 77.2 77.68 75.08 69.9 72.7 73.32 70 72.2 74.3 60 50.94 48.5 50 43.44 43.48 45.32 40 49.47 45.46 38.33 39.2 40.74 30 38.74 20 2001-022002-032003-042004-052005-062006-072007-082008-092009-102010-112011-12 The plant load factor of gas plant has also increased from 48 % in 2000-01 to about 65 % in 2009-10. The increase in PLF of gas plants during 2009-10 has been due to additional availability of gas from KG basin. However, gas PLF has considerable reduced during 2011-12 due to reduced gas production from KG D6 basin. The nuclear Load Factor however has reduced from 82 % in 2000-01 to 46.5% in 2007-08 due to fuel shortage, but has improved to 73.29% in 2011-12. However, this has only marginal effect on the reserve margin due to nuclear capacity being a small component in Installed Capacity. It is expected that with further improvement in technology of thermal power generation and higher unit size, as also higher availability of gas and nuclear fuel, Reserve margin is further expected to improve in future. However, due to shortage of fuel along-with the addition of substantial renewable capacities, the reserve margin may further go up. An encouraging feature is that this decreasing Reserve Margin trend over the years has been observed in spite of the hydro thermal mix has been varying marginally. This implies that effect of increased PLF of thermal stations is more predominant in reducing the Reserve Margin than the effect of reducing hydro thermal mix of Installed Capacity to increase the Reserve Margin. In general the reserve margin has a direct correlation with Hydro-Thermal mix and renewable-thermal mix. As these mix increase the reserve margin would also increase. 1.6 12TH PLAN NATIONAL ELECTRICITY PLAN As mandated by the Act and the Policy, CEA has prepared the National Electricity Plan for the 12th Plan, the perspective Plan for the 13th Plan and a review of the Status of implementation of the 11th Plan. The draft NEP was circulated to all Stakeholders for their comments/suggestions which have been appropriately incorporated in the Plan. A copy of comments from Stakeholders is enclosed in Annexure 1.2. ---+++--- % Variation of Reserve Margin and Thermal PLF (%) Reserve Margin (excluding Renewables) RM % Thermal PLF % (Coal & Lignite)300 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Annexure 1.1 STATUS OF ULTRA MEGA POWER PROJECTS Sl. Name of Capacity Source of coal Status No. UMPP/State (MW) supply A. Status of Nine UMPPs Originally Envisaged 1 Sasan UMPP/ 6x660 Captive Coal blocks Project awarded and transferred to M/s Madhya Pradesh Mohar, Mohar Reliance Power Ltd. on 07.08.2007. Project is Amlori Estn, under construction. All the six units are Chhatrasal expected to be commissioned in 12th Plan. 2 Mundra UMPP/ 5x800 Imported Coal Project awarded and transferred to M/s Tata Gujarat Power Ltd. Project on 24.4.2007. The Project is under construction. The First and Second Unit of 800 MW each of Mundra UMPP synchronized on 8.1.2012 and 10.7.2012 respectively and achieved Commercial operation date from 7th March, 2012 and 30th July, 2012. Remaining 3 Units are expected to be commissioned in 12th Plan. 3 Krishnapatnam 6x660 Imported Coal The Project awarded and transferred to M/s UMPP/ Reliance Power Ltd. on 29th January, 2008. Andhra Pradesh The developer of Krishnapatnam Ultra Mega Power Project namely M/s Coastal Andhra Power Ltd(CAGPL) had started the construction work but since stopped the construction work citing new regulation of the Govt. of Indonesia on coal price as the reason. The Delhi High Court has dismissed the petition of CAPL against termination notice by the lead procurer (APSPDCL). CAPL has approached Division Bench, Delhi High Court as well as Indian Arbitrator Council for Arbitration. The matter is subjudice. 4 Tilaiya UMPP/ 6x660 Captive coal block Project awarded and transferred on 7 August Jharkhand Kerandari B&C 2009 to M/s Reliance Power Ltd. Construction of the plant is yet to be taken up as the land has not been handed over to the developer. As per PPA the five units of 660 MW each are scheduled to be commissioned in 12th Plan and one unit in 13th Plan. 5 UMPP in Orissa 4000 Captive coal block Request for Qualification (RFQ) bids for Meenakshi, selection of the Developer of the project have Meenakshi B & been received which are under evaluation. dipside of Meenakshi 6 UMPP in 4000 Captive coal Block Request for Qualification (RFQ) for selection Chhattisgarh Pindrakhi & Puta of the Developer of the project have been Parogia issued in May 2010. Date of submission of RFQ bids extended for want of clearance from MoEF for the allocated captive coal blocks is earlier categorized under category ‘A’.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 301 7 Cheyyur UMPP/ 4000 Imported coal The site has been finalized. REIA report for Tamil Nadu power plant is under finalization. RfQ to be issued after Standard Bidding Documents (SBDs) are revised. 8 UMPP in 4000 Imported coal Site could not be firmed up due to resistance Maharashtara by local people. 9 UMPP in 4000 Imported coal The site originally identified at Tadri could Karnataka not be taken up due to agitation by local people. B Status of additional seven nos. UMPPs 1. Second UMPP in 4000 Imported Coal The site has been identified in Nayanpalli Andhra Pradesh village (Prakasham distt.). The process of land acquisition initiated. 2 Additional UMPP 4000 Captive coal blocks. The site has been identified (coastal site) in in Orissa – I Bankhani Bhadrak distt. 3 Additional UMPP 4000 Captive coal blocks. The site has been identified (Inland site) in in Orissa – II Ghogarpalli & Kalahandi distt. Dipsite of Ghogarpalli. 4 Second UMPP in 4000 Imported Coal Site under investigation. Gujarat 5 Second UMPP in 4000 Captive coal blocks. Site identified in Deogarh distt. Water Jharkhand availability study is under progress. 6 Second UMPP in 4000 Imported Coal Site under investigation Tamil Nadu 7 UMPP in Bihar 4000 Captive coal blocks Site under investigation302 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Annexure 1.2 COMMENTS / SUGGESTIONS RECEIVED FROM VARIOUS STAKE HOLDERS Sl. Comments Received Summary of the Comments Our Views/Observations No. From (Company/ Organization/ Individual) 1. Chungthang Hydro To include 99 MW Hydro Project in Sikkim May be included in shelf of Power Private Limited which the company is expected to projects. commission before March,17 2. Wartsila India Ltd A number of suggestions on peaking power We may include updated plants and to include mention of gas engines, information/data in relevant update data/information. chapter of NEP including Further, suggested that instead of setting up mention of gas engines about 2000 MW peaking plant at 5 metro suitably. We may retain 400 cities (400 MW each), it should be MW peaking capacity at 5 distributed at large nos of cities (may be 100 metros to start with. Regarding MW each at 20 cities). setting up of distributed peaking power plants, views as emerged in the meeting of Task Force on Peaking Power Plant may be considered. 3 Indian Wind Power (a). Encouragement to Captive Power All the issues/problems along Association Consumers: restoration of benefits with incentives top be given of Accelerated depreciation under related to wind power as Income tax act’ from 1.4.2012 suggested by the association is retrospectively. The Captive to be looked into by MNRE. Consumer may not full fill RPO As far as NEP is concerned, fixed by regulatory Commissions. RES programme as furnished (b). Encouragement to Generators by MNRE for 12th & 13th Plan selling wind Power to Board. has been considered. (c). Encouragement to Power Project Developers: exemption of VAT & CST on purchase made to Install wind mills in Power starved states. (d) Other Common Issues Related to Wind Power 4. Lalitpur Power Lalitpur Power Generation Company Ltd Project does not have fuel Generation Company 3x660 MW to be included in the List of linkage thus we may not agree Category (a) where orders for BTG placed & and retain the project in Shelf all Clearances are in place instead of category (c). 5. Power System (i) The NEP needs to be a perspective plan (i) NEP covers details of 11th Operation Corporation covering at least one decade and it should Plan & ongoing 12th Plan & Ltd indicate 15 year perspective picture. perspective 13th Plan covering 15 year periods. (ii) Workshops/road shows should be (ii) Regional level meeting conducted to publicize the Plan. have been conducted and it may not be feasible to hold road shows etc (iii) The NEP should be available in Public (iii) NEP is to be publicized in Domain instead of on sale as earlier. Gazette of India. After Gazette notifications, decision for putting NEP on CEA website may be taken.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 303 Sl. Comments Received Summary of the Comments Our Views/Observations No. From (Company/ Organization/ Individual) (iv) Plan should lay emphasis on future (iv) Hydro projects based on pumped storage schemes. their status have been considered in NEP (v) In view of larger addition of coal based (v) Water availability for plant (about 66 GW) in 12th Plan, water thermal projects is an issue scarcity leading to power shortages need to and it has been included in the be highlighted in the document. Plan which may further be highlighted. However projects being implemented have water allocation. (vi) To give details of Case-1, Case-2 and (vi) May not include in Plan as merchant plants information dynamic in nature (vii) No viable plan can be (vii) To have Plan B if coal not available prepared without coal based capacity. Also CIL to be requested to ramp up its production (viii) Statewise load and IC status to be (viii)Planning on All India included with season-wise details basis. States to tie up power. Through Case-1, Case-2 bids. (ix) Other comments on various (ix) To be suitably paras/chapters regarding updating of incorporated/updated. data/information 6. Jhabua Power Ltd Jhabua Power (1x660 MW) coal based TPS May be included in the shelf in M.P. should also be included in 12th Plan of projects. list. 7. Chamber of Small (i) To add higher renewable Capacity of Renewable capacity as per Industry Association. 30,000 MW. Keeping in view the Coal MNRE programme. High Shortage, higher Coal Imports, renewable Scenario done. Transportation Problem & Land acquisition etc. (ii).Spinning Reserve to be maintained of Spinning Reserves ( 5%) are the level of 2.5to3% being planned as per National Electricity Policy (iii)T&D Losses to be reduced to 12% (iv)Energy Consumption to be reduced to 5.75% of the energy used in Small Micro & Medium Enterprises. (v)Areas of higher R&D losses should have 10% higher energy tariffs. 8. Indian Wind Energy (i)Solar & wind Sector should be given Wind capacity addition Association topmost priority programme in NEP is being (ii) Greater recognition to wind Power at par taken as per the MNRE inputs. with solar energy sector must be provided. (iii) To include Policy measures for wind Other issues related to energy like accelerated depreciation etc. incentive etc can be taken up (iv)On-shore potential is about 1 lakh MW with MNRE. (at 80 mts hub height) which is much more than what CWET had estimated roughly304 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Sl. Comments Received Summary of the Comments Our Views/Observations No. From (Company/ Organization/ Individual) 45,000 MW (at 50 mts hub height) (v)The Issue of wind Potential and Capacity addition should be addressed property in NEP. Policy for wind energy Should in Place. 9. Dr Bharat (i) Target of capacity addition of about (i)The demand forecast has Jhunjhunwala, formerly 80,000 appears to be based on demand been taken as per the 18th EPS professor, IIM projections at present price of about Rs report. Banglore 3/kwh, while it should be based on electricity price of about Rs 6/kwh (considering environmental externalities). (ii) Country should generate and consume only so much electricity that is economically (ii) Our endeavor is to meet all justified at the true price of electricity. The the demand as per National true demand would be less than that is Electricity Policy. prevailing in the market at present. The demand should be accordingly scaled down. (iii) Energy intensity of our economy has been declining. This has not been taken into account in developing forecasted demand. (iii) The energy intensity has This may be factored into. been taken into account. (iv) In view of the depleting coal, necessary to develop a system of prioritizing different categories of consumptions and making a (iv) May not agree system to meet the demand for high category consumers before low category consumers. (v) Hydro power being promoted as part of low carbon strategy. The carbon emission from hydro power is about three times as compared to emission from thermal. (vi) The present policy of ignoring (v) may not agree environmental externalities is discriminatory against generating States as they bear most of the environmental cost while benefits are reaped by consuming States. (vii) Thermal plants having attached coal (vi) The Issue needs to be mines are required to reforest the mined area. taken up separately. (viii) There is need to make a clear cut road map for time of day pricing so that load on gas and hydro is reduced. (ix) Cost plus tariff for hydro plants is leading to overall-inflating capital costs. It is vii) Being done in some suggested that a system of audit or mines, needs to be adopted as benchmark pricing may be introduced. general practice. (viii) TOD metering and smart grid concept is being initiated in different States. ix) For all the projects received in CEA for TEC, cost estimates are checked based on benchmark prices.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 305 Sl. Comments Received Summary of the Comments Our Views/Observations No. From (Company/ Organization/ Individual) 10. Spic Electric Power To include the Project 1x525 MW TPS at We may include in the shelf of Corporation (Pvt) Ltd. Tuticorin Stage IV during 12th Plan. projects 11. Teesta Hydro Power To include Bhimkyong Hydro Power project EC yet to be obtained. Very Ltd (99 MW) at North Sikkim in 12th Plan List. ambitious target for commissioning by June 2016. We may include in the shelf of projects. 12 PTC (i) Fixing of 12th Plan target to be done well (i)The 12th Plan target is being in advance so as to enable utilities to initiate finalized by Planning action to meet target. Commission. (ii)Emphasis on distribution Sector for commercial viability of entire power sector. (ii) In Distribution States have (iii)Planning Should be in Synchronization to play major role. with Integrated Energy Policy and higher share of gas in energy mix should be (iii) In view of non availability considered. of gas, no new gas based power plants have been planned for 12th Plan, except (iv)Duration of PPA of Gas/Coal based already under construction. Projects Should coincide with fuel Supply (iv) Necessary amendment is agreement not for the duration 15-18 years being made by MoP in bidding and necessary amendment Should be made in documents. Article 6.4 of Chapter 14. (v) Projects allotted through Competitive bidding facing fuel problems & on many other fronts and should be addressed in NEP. (v)The problems of power (vi)Impetus to Reservoir type hydro projects sector specially fuel issues and R & R problem should be addressed. have been covered in NEP. (vi) Additional material on (vii)Pumped Storage Plants (PSP) projects mechanism to promote potential should be utilized in a great way. Reservoir type Hydro Plant At present utilizing only 5% only. and R&R issues may be (viii)Examine the reasons of slower / non covered. implementing DSM measures. (vii) PSS plants are being planned to the extent feasible. (viii) States have to play proactive role in implementing the DSM measures. 13. MB Power Requested for Including 2x660 MW TPS in We may include in the shelf of (Chhattisgarh) Limited. Chhattisgarh in 12th Plan projects 14. Lachung Hydro Power To including 99 MW Lachung Hydro project EC is yet to be obtained. Pvt Limited in North Sikkim in 12th Plan. Ambitious target for 12th Plan. We may include in the shelf of projects 15 Power Research & A number of corrections/suggestions in We may incorporate the Development various chapter of NEP, mostly related to observations/suggestions Consultants Private typographical errors, data updating, page appropriately. Limited breaks, table numbering etc has been made.306 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Sl. Comments Received Summary of the Comments Our Views/Observations No. From (Company/ Organization/ Individual) Some of the comments are as under: (i)For demand Projection econometric approach need to be considered. (ii)In demand Cheaper Scenario presented for 12th &13th Plan are same & need to be corrected. (iii)Distributed generation need not be near Load Center as given Section 4.3 (Page 57) (iv)Cost of wind Energy is at par with coal generation but in other Cases non Conventional is Considered with other type of generation (Section 5.2.2 Page 92). (v)Peaking Plant is not necessarily near load centre Page 92 & 231. (vi)From Grid Code LOLP is 2% where we are adopting 1% LOLP & 0.15% ENS needs to be verified. (vii)PLF of coal based units for rating 800/600 MW and 500/250/210/200 MW units Can be modified to 85% (Section 6.3.6 page 105) (viii)The word Reserve Margin can be replaced by Capacity Reserve (page no 224). 16 Tata Project Ltd Modifications suggested in prequalification May be taken up separately. criteria for bidders to be eligible to bid for EPC jobs 17 Haryana Power To include 1x660 MW Ext Project by EC is yet to be obtained. We Generation Corporation DCRTPP in 12th Plan. may include in the shelf of Ltd. projects 18 U.P. Power Lalitpur TPS (3x660), Bhognipur TPS-1 Only those projects planned Transmission (2x660+2x660 MW), Sandita TPS (2x660), for commissioning during 12th Corporation Ltd Meja II (2x660) Ghatampur (3x660 MW) Plan as per target set by ,Jawaharpur (3x660) May be included is 12th Planning Commission, is to be & 13th plan. included in the 12th Plan list. However, projects planned by U.P. may be included in the shelf of the projects. 19. SINDYA POWER 2x660 MW Coaster Based TPS at Sirkazhi EC is yet to be obtained. We (Tamilnadu) may be included in the List of may include in the shelf of 12th & 13th Plan. projects 20. Association of Power (i)Signing of FSA – It needs to be ensured A number of Producers that FSAs for Plants which shall be suggestions/issues raised by Commissioned by 31.3.15. will have a FSA APP related to FSA, PPA, Singed at least a month before Revision in Standard Bidding Commissioning. Documents, Fuel Shortage, speedy E&F clearance etc (ii)Precondition of PPA for signing FSA: - needs to be addressed at As per new model FSA, longterm PPA is a appropriate forum.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 307 Sl. Comments Received Summary of the Comments Our Views/Observations No. From (Company/ Organization/ Individual) requirement for signing the agreement. It may however be noted at time of award of These issues may be addressed coal linkage no requirement/ Condition of separately. Editorial changes having a long with PPA with distribution may be suitably incorporated Companies was mandated. Further the letter of assurance also did not mandate any such requirement /condition. when huge investment have been made and contracts have been Signed on the above basis. It is unfair to impose Condition seeking signing long term PPA as precondition to singing of FSA. FSA should not be any additional condition and be aligned with there LOA and conditions detailed in LOA. (iii)If requirement of PPA is retained, in the light of deficit situation, one can not afford to have a Project Commissioned but unable to Supply Power because lack of PPAs. In such a Condition developers propose that who have not yet singed PPA but have Commissioned /Partially Commissioned /made progress in the Project be allowed to enter is FSA with CIL now with a condition that actual Supply of Coal as per FSA will be triggered when PPA is Singed Subsequently. (iv)There has been a Shortage of Competitive bidding opportunely. It is to be noted that there are numerous States which have not even called bids and the Southern Region despite the deficit Region, is yet to conclude a single bid. It is essential to create conditions enabling the State to call for power procurement bids so that projects which have already been commissioned or likely be commissioned in the time to come can have PPAs signed. However considering the paucity of Case-I bidding opportunities there are projects which are about to be commissioned and have LOA & but would not able to produce/generate power for want of PPAs. In such a situation of acute power defect, the solution which suggests itself is allow such project to approach to concerned state & regulator to get tariff fixation under section 62 so that they can start receiving coal supply and generation power. (v)Material Changes in New FSA a) Minimum level of 80% of nomination coal requirement. b) FSA Singed before march, 2009 needs to be retained c) The requirement of PPA execution before singing FSA needs to be consider in the light308 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Sl. Comments Received Summary of the Comments Our Views/Observations No. From (Company/ Organization/ Individual) of lack of case-I opportunity and till the residual pricing issues are resolved by MoP to land policy certainty. In the worst case coal supply under FSA be given commensurate with the % capacity tied up upright long term PPA. (vi)There should be a clear cut policy on merchant plants. As the merchant plants are being put up across the country. If suddenly fuel is denied to them due to precondition of long term PPAs, the project would be in danger of getting stranded. (vii)80% required coal as per FSA is supplied and imported coal has to be blended to run the plant at 86% PLF. Due to higher variable Cost which utilities are unable/not willing to pay. There should be Clear cut Policy on blending making the fuel Cost a pass through in new and old PPAs should be recommended. (viii)As per National Tariff Policy Power is to be Procured through competitive bidding from 1st Jan, 2011. The developer can not bear Commodity price and quantum risk for 25 year .Therefore in new standard bidding document the fuel price has to be made pass through .A separate bidding document needs to be notified for power procurement from Gas base Power Projects as the risk of these Projects are Considerably different form Coal based Projects. (ix) Expedite E & F Clearances: In view of the huge impact of non availability of Coal on energy availability, Power prices (which will shoot up If the shortage of Coal persist) as well as Capital stranding. It is absolutely imperative that coal bearing areas are provided forest Clearances swiftly, with necessary Safeguards. The procedural delay needs to be cut but not the safeguards. While the action has been taken such as removal of No-Go Policy and allowance of parallel processing of E & F Clearances for Coal blocks as well as Power projects. There are still Projects Struck under erstwhile NO-Go areas which needs to be cleared expeditiously. 21 Athena Power Ltd. Request for change in name of project as We may agree to change the “Athena Chattisgarh Power Limited”-600 name and capacity of the MW. project.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 309 Sl. Comments Received Summary of the Comments Our Views/Observations No. From (Company/ Organization/ Individual) 22 Shri N. Pradeep A number of typographical errors, alignment The suggestions/ corrections Kumar, errors and some other corrections in NEP are being addressed suitably Power Company of have been suggested. Karnataka Limited 23 NEEPCO (i)The projects planned by NEEPCO for 12th (i)We may include projects Plan are matching with NEP. However, other proposed by NEEPCO in the projects totaling to 1851 MW for 13th Plan shelf of the projects. should be included in 13th Plan list. (ii) Requested to include 46 MW AGTP combined cycle extension project in 12th (ii) only projects having Plan. assured gas supply have been (iii) Updated information related to R&M included in 12th Plan projects in N.E have been provided and (iii) Being updated. requested to updation in NEP. 24 NHPC Ltd (i) Number of suggestions on some major (i) We may incorporate in issues/concerns, reasons for delay in NEP appropriately and update execution of hydro projects in 11th Plan and the status of NHPC projects. suggestive measures to accelerate the pace of hydro development in 12th Plan have been suggested. (ii)Represented that 3 projects of NHPC (i)Since 11th Plan is over now. listed in 12th Plan list. However slippages The slipped projects can be projects are not listed. listed in 12th Plan (iii) NHPC has provided list of 4480 MW hydro projects for 12th Plan and requested to (iii) 12th Plan projects as per incorporate in 12th Plan list. Planning Commission target (iv)To accelerate pace of hydro development, a number of suggestions viz. single window (iv) Suggestions proposed by clearance for E&F and wildlife clearance to NHPC may be taken up at hydro projects, Separate Prior-forest appropriate forum. clearance for carrying out Development/DPR works , Cumulative impact study of River Basin , River Basin optimization studies, Infrastructure Development in the basin, Establishment of manufacturing units of equipments in hydro rich States, National Grid to Evacuate power from Norh East, Compensatory afforestation in NE, Advanced (v)Net Present Value (NPV) and its upfront payment for assessing the cost of forest diversion needs to be reviewed as the same have added huge financial burden on the (iv)Appropriate action may be storage hydro schemes making them decided unattractive. Suitable policy changes required. (vi) Keeping in view the concerns of private developers, large hydro projects should be (vi) In view of new hydro developed through PSUs only so that policy, reservation of large accountability towards cost of power, hydro projects to PSUs environmental coconscious, benefits to locals appears to be difficult and end users may be ascertained.310 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Sl. Comments Received Summary of the Comments Our Views/Observations No. From (Company/ Organization/ Individual) 25 Astha Power (i) 35 MW gas based power projects of the Gas projects having firm fuel Corporation Private Ltd company which is in advanced stage of linkage from local sources construction may be included in 11th Plan. have been included in 12th (ii) Additional 6 gas engines and 1STG under Plan. 12th Plan 26 MP Power Nil comments management Company Ltd 27 W.B State Electricity Data updation/ status of R&M projects of We may agree Distribution Co Ltd WBSEDCL have been provided with request to update the same in NEP 28 Shankar Sharma, (i)The difficulty in ensuring adequate fuel, (i)These constraints have been Power Policy Analyst land acquisition issues, peoples’ opposition considered while deciding the for large scale displacement and ever targets for capacity addition increasing levels of environmental awareness programmes by CEA and among people will all pose obstacles in Planning Commission. achieving the high capacity addition targets. Hence there is clearly needs to factor into above constraints in CEA’s growth target for future plans (ii) Electricity demand projection for 10 to (ii)So far demand projected by 20 years should be linked to a realistic CEA’s EPS reports matches appraisal of need of our society at all levels with actual demand within which then will in turn ensure responsible acceptable tolerance. Hence management of power sector. demand projection by 18th EPS has been adopted for 12th/13 Plan power planning. (iii)Instead of projecting future demand with (iii) In power deficit situation GDP maximizing paradigm, the country prevailing in almost all States must aim at determining the least amount of in the country and where electricity required to eradicate poverty. The millions of people are society may not afford huge capacity deprived with basic needs of addition on grid and additional demand may electricity, country must strive not contribute to the economic development. to meet the aspiration of the The social. Economic & environmental cost people. Moreover, electricity on society for huge addition will be is one of the prime movers of enormous. Therefore, there is need to keep our economy and it must be the overall demand within manageable limit. made available to meet the demand of all segments of the society. (iv) Power Sector may not need a lot of (iv) Existing capacity can additional capacity if the existing provide additional electricity, infrastructure is put to use optimally. if adequate fuel is ensured. Additional power required by 2021 may be MNRE has planned for planned from renewable sources. additional RES capacity of about 30,000 MW in 12th & 13th Plan each. (v) For generation planning, total cost of the (v) Yes. Total emission would¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 311 Sl. Comments Received Summary of the Comments Our Views/Observations No. From (Company/ Organization/ Individual) project (both direct &indirect cost) to the increase but emission intensity society should be the criteria instead of only is coming down due the financial cost to the project developers. increasing shares of RES and The low carbon growth strategy for 12th & efficiency measure being 13th Plan would be negated by the huge adopted. Power planning of additional GHG emission resulting from the country depends upon large conventional power plants planned to source of fuel available in the be added. country and our dependence on coal would continue in near future. May not agree. (vi) Definitive plans to phase out coal based power plants in next 25-30 years. 29 Chalakudy Puzha (i)CEA’s draft Plan does not conform to (i) Even though, RES is being Samrakshna Samithi sustainable growth plan. Rather, if planned & implemented implemented, will take the nation on a fast aggressively, huge power track towards an ecological catastrophe. The demand can not be met Plan states that “ Out of conventional without conventional sources sources, hydro and nuclear are clean source of generation which is bound of energy, therefore been provided priority. to have GHG emissions /R&R This is highly deplorable. issues and other associated problems. The choice of the Large Hydro Plants displace and submerge country between power or no and emit methane power on ground of environmental and social issues needs larger debate. (ii) Saving potential due to (ii) Saving potential has not been considered DSM measures and BEE’s in demand projections. Providing electricity energy efficiency measures thousand units per month for affluent have been taken into account households or for mere decorative purposes while planning. Wasteful use shall not be criteria for generation planning. of electricity is not desirable The present growth of the industry sector is but demand of the unfortunately compromising on the ability of industry/commercial the future generations to meet their own establishments have to be met demand. for overall economic development of the country. (iii) In views of problems associated with (iii) As elaborated earlier, hydro plants, it has been suggested that Govt country needs hydro power must immediately order a moratorium on all and problems/issues new hydro projects and go for associated with hydro needs to comprehensive and participatory post-facto be sorted out amicably. analysis of existing hydro projects. 30 International- Rivers (i) The Plan needs to address the GHG (i) High priority of hydro plant emissions from reservoirs and declining is as per Low Carbon Growth performance of hydropower before Strategy adopted by country. proposing hydropower as high priority for electricity generation. (ii)The plan should also state the needs for (ii) We may decide. decommissioning of hydro plants like312 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Sl. Comments Received Summary of the Comments Our Views/Observations No. From (Company/ Organization/ Individual) thermal power plants. (iii) Almost all proposed hydro generation in (iii)India has both peak & Himalayan belt, amounting to tens of energy shortages as such thousands of MW is being proposed for peak peaking power plants are also load generation. The environmental & social required to be planned. externalities of peaking hydro plants are very high. As such reliance on hydro for peaking power needs to be revisited and reduced. (iv)It is incorrectly stated that no peaking stations are under construction except Tehri ( Section 13.5). Teesta Stage-V is a peaking (iv) We may modify this line. power plant. (v) Environment & Forest clearance are identified as hurdle (Chapter 14, section-3 Major issues). The clearance rate from (v) Although E&F clearance MOEF is 99%. The plan is making the rate may be high but time recommendation; shows scan respect for taken in clearance is longer environment and social cost. This leading to delay & cost recommendation should be deleted. overrun of the projects. Suitable rewording of this paragraph may be considered. 31 A Raja Rao, Retired The concept of Loss of Load Probability Lower LOLP of 0.2 % has Executive Director, (LOLP) & VOLL (Value of Lost Load) been adopted for 12th Plan to BHEL needs to be adopted in the vision part of the meet the demand in the Smart Grid Documents. The aim of power country with quality power system is to serve the needs of all classes of supply to all segments of customer along-with quality power supply, consumers. therefore it should be given proper recognition. 32 Jacqueline, Johannes Some corrections ( same as suggested by Being addressed as per S.No.2 Wartsila (S.No.2 above) have been above suggested. 33 Bhakra Beas No comments except updated data of R&M We may update data Management Board for Bhakra LB has been provided. 34. HERM Div CEA, Table 4.7,4.8 and Annexure 4.3 have been Updated information has been updated. incorporated in NEP.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 313 Chapter 2 REVIEW OF CAPACITY ADDITION IN 11TH FIVE YEAR PLAN (2007-12) 2.0 INTRODUCTION The capacity addition for the 11th Plan was planned keeping in view the aims and objectives of the National Electricity Policy. The capacity addition target set for the 11th Plan was 78,700 MW, about quadruple of what could be actually achieved during the 10th Plan. Achieving this huge target required timely placement of orders, augmentation of manufacturing capacity, skilled manpower and construction machinery, timely statutory clearances and close monitoring & coordination between the executing agencies. This Chapter includes details of capacity addition and the efforts being made to address the constraints faced in timely execution of the power projects. 2.1 11TH PLAN TARGET One of the major objectives of the National Electricity Policy is that demand is to be fully met by the year 2012 with all peaking and energy shortages to be removed. In addition, the overall availability of Installed Capacity is to be enhanced to 85% and a Spinning Reserve of at least 5% needs to be created. Also, the per capita availability of electricity is to be increased to over 1000 kWh by 2012. Towards fulfilling these objectives and considering the feasibility of implementation of various projects to materialize during the 11th Plan, the capacity addition target for the 11th Plan was fixed at 78,700 MW as per details given in Table 2.1 and Exhibits 2.1 to 2.2 below: Table 2.1 11th Plan Capacity Addition Target Figures in MW SOURCE Central State Private TOTAL Hydro 8654 3482 3491 15627 Thermal 24840 23301 11552 59693 Nuclear 3380 - - 3380 Total 36874 26783 15043 78700 Exhibit 2.1 Nuclear Gas/LNG Hydro 3380 6843 15627 Lignite 4% 9% 20% 2280 3% Coal 50570 Total: 78700 MW 64%314 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Exhibit 2.2 Private 15043 19% Central 36874 47% State 26783 34% Total: 78700 MW 2.2 PREPARATION FOR CAPACITY ADDITION IN 11TH PLAN 2.2.1 Indigenous Manufacturing Capacity: BHEL being the largest supplier of power plants equipment was expected to get major orders for the 11th plan. CEA had anticipated placement of order of over 50% of generation capacity on BHEL and power sector was heavily dependent on BHEL for timely supply and execution of power projects. CEA reviewed the preparation of BHEL to meet the capacity addition requirements of the 11th plan. Before the commencement of the 11th plan, CEA teams visited the BHEL works and held detailed discussions with BHEL executives about the requirement of power sector and their plans for expansion to meet the increasing requirement of the power sector. CEA in its report of March,2007 recommended augmentation of manufacturing capacity, enhancing of vendor list to outsource manufacturing of some of the items, enhancing manpower in manufacturing, design & engineering and project execution, advance procurement action for critical items, such as forging, castings, high pressure boiler materials for which there are few suppliers world wide , procurement of adequate construction machinery instead of depending on the leased one and IT based monitoring. Review meetings were held with BHEL to discuss the augmentation plan of BHEL. 2.2.2 Action was also taken to arrange coal linkage for 11th plan projects. Matter was taken up with MoE&F to accord priority to identified 11th plan projects for Environment and Forest clearance. 2.2.3 An International Conclave on Key Inputs for Accelerated Development of Power Sector for 11th Plan & beyond was organised by CEA on 4th and 5th July,2007 to sensitise the Utilities, IPPs and the Industry about the requirement of the power sector during the 11th plan. CEA furnished the requirement of different types of equipments and materials in generation, transmission & distribution required for implementation of the 11th plan. The major recommendations of Conclave were augmentation of manufacturing capacity both for main plants and balance of plants, timely placement of orders , review of pre-qualification requirements to permit participation of new players in the bids, measures to augment skilled work force including adopt an ITI schemes by project developer around the project area to develop skills amongst the locals, standardisation, etc. These recommendations were followed by organising Regional Workshops at Chennai, Chandigarh and Mumbai. During these Conferences, the industry was impressed upon to enhance their manufacturing capacity as well as encourage new entrepreneurs in these areas to meet the requirement of the Power Sector. The constraints being faced in this regard were also discussed and a view was formed to deal with these. 2.2.4 Government of india also constituted a Committee under Dr Kirit Parekh then Member (Energy) Planning Commission on Development of Additional Vendors for Balance of Plants. The major recommendations of the Committee are summarized below: (a) Order for BOPs (or EPC of BoPs) should be placed within six months of placement of order for main plant and equipment.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 315 (b Liquidated damages for delay in execution of project in time should be enhanced to discourage cornering of large number of contracts by few suppliers. (c) CEA to finalize the pre-qualification requirements for BoP vendors by February, 2008 end. (d) CEA and NTPC to complete the exercise for finalizing the guidelines for standardization/ broad design criterion for various packages of BoPs progressively by the end of August, 2008. (e) Capacity building for availability of skilled manpower to be taken up by the project developers. (f) Whether a level playing field is provided to domestic supplier and foreign suppliers needs to be examined. 2.3 MID TERM APPRAISAL TARGET FOR 11TH PLAN As mentioned above, the target set for capacity addition during the 11th Plan was 78,700 MW. As per Mid Term Appraisal (MTA) of Planning Commission, certain projects totalling to 21,802 MW were likely to slip from 11th Plan on account of various reasons viz. delay in placement of order for main plant, slow progress of civil work, poor geology etc. Further, certain additional projects which were originally not included in the 11th Plan target were identified for benefits during 11th Plan by expediting the process of project implementation and compression of the construction schedule. This has been possible through extraordinary efforts made by Ministry of Power & CEA in pursuing the developers and other Stake holders. These additional projects total to 5,156 MW. Based on the above, capacity addition likely during 11th plan as per Mid Term Appraisal (MTA) was fixed as 62,374 MW. A Summary of the likely slippages and additional projects identified is given in Table 2.2 below: Table 2.2 SUMMARY OF CAPACITY SLIPPING / ADDITIONAL CAPACITY FOR LIKELY BENEFITS DURING 11TH PLAN Figures in MW 11th Plan Capacity Addition Target (A) 78,700 Slipped From Target (B) 21,802 Balance Capacity (C) 56,898 Change in Capacity of projects as included in Target (D) 320 Increase in capacity of Anpara C 200 Increase in capacity of Sugen CCGT 20 Increase in capacity of Mettur Ext 100 Additional Capacity Likely during 11th Plan Outside Target (E) 5,156 Total Capacity (F) = (C+D+E) 62,374 Thus capacity addition likely during 11th Plan as per Mid Term Appraisal (MTA) is 62,374 MW. A Sector wise Summary of this capacity addition target of 62,374 MW is furnished in Table 2.3 below:316 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Table 2.3 SUMMARY STATEMENT OF MID TERM APPRAISAL TARGET DURING THE 11TH PLAN (SECTOR WISE AND TYPE WISE) (Figs in MW) HYDRO TOTAL THERMAL BREAKUP NUCLEAR TOTAL THERMAL CENTRAL SECTOR 2922 14920 13430 750 740 0 3380 21222 STATE SECTOR 2854 18501 14735 450 3316 0 0 21355 PRIVATE SECTOR 2461 17336 13725 1080 2531 0 0 19797 ALL-INDIA 8237 50756.9 41890 2280 6587 0 3380 62374 2.4 ACTUAL CAPACITY ADDITION DURING 11TH PLAN A capacity of 54,964 MW has been commissioned during 11th plan. The Year wise/Fuel wise & sector-wise capacity commissioned during 11th Plan is given in Table 2.4 & Table 2.5 below: Table 2.4 (Figures in MW) Type 2007-08 2008-09 2009-10 2010-11 2011-12 Total Hydro 2,423 969 39 690 1,423 5,544 Thermal 6,620 2,485 9,106 11,251 19,079 48,540 Nuclear 220 0 440 220 2,000 880 Total 9,263 3,454 9,585 12,161 20,502 54,964 Table 2.5 Summary of Type-wise and Sector-wise Actual Capacity Addition During 11th Plan SECTOR HYDRO THERMAL (MW) NUCLEAR Total (MW) (MW) Capacity (MW) Coal Gas Lignite Total CENTRAL SECTOR 1550 11550 740 500 12790 880 15220 STATE SECTOR 2702 11695 1885 450 14030 0 16732 PRIVATE SECTOR 1292 18649 2530 540 21720 0 23012 ALL-INDIA 5544 41894 5156 1490 48540 880 54964 A Summary of State-Wise /Sector-Wise capacity addition target/achievement for 11th Plan is given in Annexure-2.1¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 317 2.4.1 Year-Wise Targets & Actual Capacity Addition (2007-12) A summary of revised programme/targets and actual achievement during 11th Plan (2007-12) is as below: Table 2.6 Capacity addition Target/Achievement during 11th Plan (Figures in MW) Hydro Thermal Nuclear Total Target Actual Target Actual Target Actual Target Actual 2007-08 2372 2423 8907 6620 660 220 12039 9263 2008-09 1097 969 5773 2485 660 0 7530 3454* 2009-10 845 39 13002 9106 660 440 14507 9585 2010-11 1,346 690 17,793 11,251 1,220 220 20,359 12161 2011-12 1,990 1423 13,611 19,079 2,000 0 17601 20502 *Low achievement due to change in definition of commissioning by CEA/MoP The summary of capacity slipped/additional capacity viz.-a-viz. actual capacity commissioned during 11th Plan is given in Table 2.7 Table 2.7 Figures in MW Capacity Addition Target (A) 78,700 Slipped From Target (B) 33,415 Balance Capacity (C) = (A-B) 45,285 Change in Capacity in Target (D) 405 Increase in capacity of Anpara ‘C’ from 1000 MW to 1200 MW - 200 Increase in capacity of Sugen CCGT from 1128 MW to 1148 MW - 20 Increase in capacity of Udupi TPP from 1015 MW to 1200MW - 185 Total capacity from original target (C+D) 45,690 Additional Capacity commissioned outside the 11th plan programme 9,274 Total Capacity (F) = (C+D+E) 54,964 A comparative list of 11th Plan projects as per original target of 78,700, Mid Term Appraisal target of 62,374 MW and actual capacity addition of 54,964 MW is furnished in Annexure 2.2. 2.4.2 Reasons for Delay in Commissioning of Projects during 11th Plan. • Delay in placement of orders - mainly Civil Works and Balance of Plants (BOPs) • Delay and non-sequential supply of material for Main Plant and BoPs. • Shortage of skilled manpower for erection and commissioning. • Contractual dispute between project developer and contractor and their sub-vendors/sub-contractors. • Inadequate deployment of construction machinery. • Shortage of fuel (Gas and Nuclear). • Land Acquisition. • Inadequate infrastructure facilities like reliable construction power supply and constraints in transportation of heavy equipment.318 THE GAZETTE 2.5 CAPACITY ADDITION FROM CAPTIVE POWER PLANTS Large number of captive plants including co which are utilized in process industry and in plants to ensure reliable and quality power. Some plants are also installed as stand emergencies when the grid supply is not available. Surplus power, if any, from captive power plants cou the grid as the Electricity Act 2003, provides for non A capacity addition of about 14,176 MW (tentative) from Captive plants has been achieved during 11 information received from captive power plant manufacturers, industries and other sources. The Year furnished at Exhibit 2.3 below: 5000 4500 4000 3500 3000 2651 2500 2000 1500 1000 500 0 2007-08 As on 31st March, 2012, the Installed Capacity of Captive Power Plants (1M installed capacity has registered growth of 10.9 % over the installed captive plant capacity of 32,900 MW as on 31 March, 2011. The energy generation from captive power plants (1 MW and above) during the year 2010 114 billion units and registered a growth of about 7.5 % in generation over generation of 106 billion units during 2009 10. During the year 2010-11, surplus power of 14.2 BU from captive was fed into the grid. 2.6 GRID INTERACTIVE RENEWABLE In the 11th Plan, a capacity addition of 14,000 MW from renewable power sources has been envisaged. Source details are given in Table 2.8 below: )WM( GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 2.5 CAPACITY ADDITION FROM CAPTIVE POWER PLANTS Large number of captive plants including co-ggeenneerraattiioonn ppoowweerr ppllaannttss ooff vvaarriieedd ttyyppee aanndd ssiizzeess eexxiisstt iinn tthhee ccoouunnttrryy,, which are utilized in process industry and in-house power consumption. A number of iinndduussttrriieess sseett uupp tthheeiirr ccaappttiivvee plants to ensure reliable and quality power. Some plants are also installed as stand-bbyy uunniittss ffoorr ooppeerraattiioonn oonnllyy dduurriinngg eemmeerrggeenncciieess wwhheenn tthhee ggrriidd ssuuppppllyy iiss nnoott aavvaaiillaabbllee.. SSuurrpplluuss ppoowweerr,, iiff aannyy,, ffrroomm ccaappttiivvee ppoowweerr ppllaannttss ccoouuld be fed into the grid as the Electricity Act 2003, provides for non-discriminatory open access. AA ccaappaacciittyy aaddddiittiioonn ooff aabboouutt 1144,,117766 MMWW ((tteennttaattiivvee)) ffrroomm CCaappttiivvee ppllaannttss hhaass bbeeeenn aacchhiieevveedd dduurriinngg 1111th Plan, based on iinnffoorrmmaattiioonn rreecceeiivveedd ffrroomm ccaappttiivvee ppoowweerr ppllaanntt mmaannuuffaaccttuurreerrss,, iinndduussttrriieess aanndd ootthheerr ssoouurrcceess.. TThhee YYeeaarr-wise details are Exhibit 2.3 YYeeaarrwwiissee AAccttuuaall CCaappaacciittyy aaddddiittiioonn ooff CCaappttiivvee PPoowweerr Plants (MW) 4843 3611 1687 1383 2008-09 2009-10 2010-11* 2011-12 Years ** AAccttuuaall ccaappaacciittyy aaddddeedd Total: 14176 MW As on 31st March, 2012, the Installed Capacity of Captive Power Plants (1MWW aanndd aabboovvee)) iiss aabboouutt 3366,,551111 MMWW.. TThhee iinnssttaalllleedd ccaappaacciittyy hhaass rreeggiisstteerreedd ggrroowwtthh ooff 1100..99 %% oovveerr tthhee iinnssttaalllleedd ccaappttiivvee ppllaanntt ccaappaacciittyy ooff 3322,,990000 MMWW aass oonn 3311st MMaarrcchh,, 22001111.. TThhee eenneerrggyy ggeenneerraattiioonn ffrroomm ccaappttiivvee ppoowweerr ppllaannttss ((11 MMWW aanndd aabboovvee)) dduurriinngg tthhee yyeeaarr 22001100-11 was about 111144 bbiilllliioonn uunniittss aanndd rreeggiisstteerreedd aa ggrroowwtthh ooff aabboouutt 77..55 %% iinn ggeenneerraattiioonn oovveerr ggeenneerraattiioonn ooff 110066 bbiilllliioonn uunniittss dduurriinngg 22000099- 11, surplus power of 14.2 BU from captive was fed into the grid. 2.6 GRID INTERACTIVE RENEWABLE POWER SOURCES DURING 11TH PLAN PPllaann,, aa ccaappaacciittyy aaddddiittiioonn ooff 1144,,000000 MMWW ffrroomm rreenneewwaabbllee ppoowweerr ssoouurrcceess hhaass bbeeeenn eennvviissaaggeedd.. SSoouurrccee- wise¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 319 Table 2.8 11TH PLAN TENTATIVE TARGETS FOR GRID INTERACTIVE RENEWABLE POWER (Figures in MW) Sources / Systems Target for 11th plan Wind Power 10,500 Biomass Power & Biomass Gasifiers 2,100 Small Hydro (up to 25 MW) 1400 Total 14,000 Source MNRE Exhibit 2.4 Biomass Power Small Hydro & Biomass (up to 25 MW) Gasifiers 1400 Wind Power 2,100 10% 10,500 75% 15% The Installed capacity of RES at the end of 10th plan was 7,760 MW where as total installed capacity at the end of 11th Plan is 24,914 MW. The target from RES had been fixed at 14,000 MW during 11th five year plan. The above target of 14,000 MW for grid interactive renewable power does not include proposed addition of 1000 MW from Distributed Renewable Power System (DRPS). Thus, a renewable capacity addition of 17,154 MW was achieved during 11th Plan. 2.7 CHANGES IN DEFINITION OF COMMISSIONING BY CEA/MoP IN AUG, 08 The commissioning / capacity addition shall be deemed to have taken place only after a unit has demonstrated its capability to generate power at name plate rating except for nuclear plants and reservoir based hydro stations. The date of capacity addition shall be the date when the following conditions have been fulfilled: A. Thermal (Coal , Gas, Lignite) i. The construction and commissioning of all plants and equipment required for safe operation of the unit is complete.320 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ii. The trial run operation has started. iii. The unit has touched full rated load with designated fuel. iv. Date of commercial operation. B. Hydro i. The trial run operation has started. ii. The unit has achieved full rated capacity in case of purely run of river stations and run of river stations with pondage. iii. The unit has achieved full rated capacity or the design capacity corresponding to prevailing reservoir level in case of storage power stations. iv. Date of commercial operation. C. Nuclear Nuclear units shall be declared to have been commissioned after these are declared “Commercially operational” by plant authority. Prior to this, a unit was considered commissioned just on synchronization with the grid. 2.8 MAJOR CONSTRAINTS IN POWER SECTOR DEVELOPMENT AND THE STRATEGY INITIATED BY THE GOVERNMENT TO MEET THESE CHALLENGES ARE AS FOLLOWS: • Enhancing Manufacturing Capacity of Main Plant BHEL has augmented its manufacturing capacity from 6000 MW/year to 15,000 MW/year and is in the process of augmenting its capacity further to 20,000 MW per annum. Pre-qualifying requirements for super critical Boiler-Turbine-Generator have been reviewed by CEA and revised advisory given to utilities in order to encourage new entrants in manufacturing sector to enhance supplies and encourage competition. A major step has been that a number of new manufacturers have came forward for setting up manufacturing facilities for Steam Generators and Turbine Generators. These include: 1. L&T-MHI 2. Toshiba-JSW 3. Alstom-Bharat Forge 4. Ansaldo Caldie-Gammon 5. BGR-Hitachi 6. Dov 7. Thermax-Babcock 8. Cethar vessals. Based on production schedules of BHEL & various JVs, it is felt that country is likely to have adequate manufacturing capacity as far as main plant equipments are concerned. Joint Venture Boilers Turbine- Remarks generator L&T-MHI 4000 MW 4000 MW • Production for Boiler and turbine commenced Alstom -Bharat Forge - 5000 MW • All manufacturing facilities for manufacture of turbines to be completed by June 2013. Toshiba- JSW - 3000 MW • All manufacturing facilities to be completed by April- 2013 Gammon- Ansaldo 4000 MW - • Probable date of completion of facilities December, 2012(2000 MW) and December 2014 (additional 2000 MW)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 321 Thermax-Babcock & 3000 MW • All manufacturing facilities to be completed by March- Wilcox 2013. BGR Hitachi Boilers 5 Boiler per • All manufacturing facilities to be completed by Jan- Private Ltd. annum 2013. (~3000 MW BGR Hitachi Turbine 5 Turbine • All manufacturing facilities to be completed by July- generator Private Ltd. generators 2014. per annum (~3000 MW Doosan Chennai 2200 MW • DCW pvt ltd is 100% subsidiary of Doosan Korea, works Pvt Ltd. *(Both incorporated in India on 20.7.2000 subcritical • Existing facility- Chennai: Additional facility acquired- and Mannur village Kancheepuram district Supercritical • Production from additional facilities to start by Sept- 2012 • Enhancing Manufacturing Capacity of BOP vendors There were limited numbers of vendors for BOP in the country. In recent past, it has been noted that some of the plants could not be commissioned due to delay in Balance of Plants, though works in main plants were completed. To overcome the problem, action has been taken to sensitize the industry to the needs of widening the vendor base for Balance of Plants like Coal Handling Plant, Ash Handling Plants, Water treatment plant etc. Industry has been impressed upon to enhance their manufacturing capacity as well as encourage new entrepreneurs in these areas. Qualifying requirements for new vendors of BoPs have been relaxed to enable new vendors to qualify for bidding. Standardisation of BoP systems and mandating a central organisation to maintain a dynamic data base with regard to BoP order is under consideration. NTPC has signed an MOU with Bharat Forge Ltd. to promote a JV Company for manufacture of castings, forgings, fittings and high pressure piping required by the Power Sector. NPC and L&T have also proposed to set up a JV for manufacturing of forgings, which besides the nuclear plant requirements will also cater to thermal power projects. • Construction agencies The need to enhance the number of construction agencies is also being stressed upon. A NTPC / BHEL JV has been firmed to take up work related to Engineering, Procurement and Construction (EPC) for power plants and other Infrastructure projects. This JV has recently obtained some orders for BOPs. The latest methods of civil construction with mechanical equipments and manpower mobilisation needs to be adopted. • Critical Materials There does not appear to be shortage of key materials except CRGO steel, higher grade CRNGO & thick boiler steel plates. Cold Rolled Grain Oriented (CRGO) steel is most commonly used for manufacture of transformer. There is worldwide shortage of CRGO steel and non availability of good quality CRGO steel in India resulted in delay in supply of transformers. To overcome such problems, efforts are being made towards timely availability of Critical Key Inputs required for power system expansion. Measures are being initiated to develop vendors for critical inputs like boiler quality plates, P91 piping, CRGO sheet steel. Advanced planning has been suggested for materials to be imported. Development of manufacturing capacities for castings & forgings for turbine/ generators is also suggested. BHEL has been requested to take advance procurement action for critical equipment like forgings and castings which have a long lead time, so as to reduce time taken to commission any unit. Matter was taken up with Government of India to give advisory to BHEL for advance procurement of a critical forgings and castings. Accordingly advisory has been given by Ministry of Finance to BHEL to facilitate advance procurement action for critical forgings/castings. • Manpower and training facilities in Power Sector There is shortage of skilled manpower in the country. It was been estimated that an additional about 1 million workmen, supervisors and engineers would be required for Construction, Operation and Maintenance of power equipment during 11th Plan. In particular, technicians of specified skills would be required in very large numbers. To overcome the above problem, high priority is being accorded to human resource development and training of power sector personnel. A very comprehensive and pragmatic approach has been adopted to attract, utilize, develop and conserve valuable human resources. To bridge the gap between supply and demand, a scheme called “Adopt an ITI”322 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] has been initiated with a view to train new technicians and to upgrade the skills of existing ones. As per this scheme, ITIs are to be adopted by power developers in the vicinity of their projects. CEA has recently recommended to Ministry of Power to make changes in National Electricity Policy, Tariff Policy and competitive Bidding Guidelines to include the cost of skill development in and around the project area in the project cost of generation and transmission projects. CERC has also been requested by CEA to consider the cost of human resource development in and around project area as a pass through in generation and transmission tariff. It has been proposed that the provision on this account should be restricted to actual expenditure or a pre-specified percentage of project cost whichever is lower. • IT based monitoring The IT based monitoring is a system which enables to receive all information about the project to be monitored and programmes in real time, thereby helping to highlight the critical issues, the cost over runs and other aspects related to be reported at various levels of management. It may be utilized to track the daily progress of ongoing power projects and expedite the process of getting clearances from various agencies and would also be helpful in placing orders of BOP/equipments on time. The system can also alert the authority for appropriate action if the project is not progressing as per schedule. The IT based monitoring system through use of software which would integrate the master network with L1 and L2 level networks to facilitate simultaneous online updation from different geographical locations. Summary dashboard information can also be accessed of all the projects and programs in real-time, helping in determining which projects are in danger of delay/late completion and running over-budget. The system would also help to:- • ensure online updation of actual dates of approval/release of each drawing by engineering deptt. in a manner that can be accessed by all concerned. • enable online monitoring of those transport/logistic activities which are critical for timely commissioning of the projects. • Monitor Poor projects performance and poor sequencing of events. • Project delays, cost overruns • visibility into scheduling and material delivery • Cost overruns, unknown implications of material cost increases. • Inefficient use of resources, incorrect mix of skills, project delay. All the projects were requested to implement IT based monitoring for effective project monitoring & implementation. However, only a few projects have implemented the same. This is required to be implemented in all the projects. Central Electricity Authority has implemented Integrated Management System-I (IMS-I) for centralized collection of data from various power generations, transmission and distribution entities in the country through web based interface. CEA has already approved the input formats and reports pertaining to IMS-I and date is being obtained in the input formats from respective organizations. CEA is also going to implement IMS-II with the following broad objectives:- • More intensive and comprehensive IT based monitoring of execution of power projects. • To provide adequate redundancy in the existing data centre to enhance reliability and availability of the system and to prepare a separate disaster recovery data centre. Since the number of projects likely to be commissioned during 12th Plan will be large, IT based monitoring would be useful to monitor and generate reports pertaining to ongoing projects. • Fuel Constraints (cid:1) Some of the projects have been delayed due to non-availability of coal, gas and nuclear fuel. (cid:1) Konaseema (445MW) and Gauthami (464 MW) in A.P. which were ready for commissioning were delayed due to non-availability of gas. These projects have since been allocated gas from KG D6 basin and have been commissioned during 2009-10. RAPP Unit-5 & 6, 220 MW each have already been commissioned, as imported nuclear fuel is now available for these units. (cid:1) In addition to above, few gas based power projects could not be commissioned during 11th Plan due to non availability of gas. The Hazira CCGT (351 MW) gas power projects in Gujarat, commissioned during 11th Plan (March 2012), is presently lying idle due to non availability of gas.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 323 • Contractual disputes A number of projects had awarded fixed price contracts during the 10th Plan period which were affected adversely due to unexpected increase in price of inputs. CEA advised all the utilities not to award fixed price contracts in future where the implementation period is longer. A model contract document with appropriate price calculation formula was circulated for the guidance of the utilities. During the one-day International Conclave on “Contract Management for Accelerated Development of Hydropower Projects” on 16th November, 2007 at New Delhi organized by the Ministry of Power and Central Electricity Authority, it was concluded that there are deficiencies in the existing contract documents and management systems/practices, leading to contractual disputes affecting the development of the hydropower projects. A need was felt to prepare equitable documents as guidelines for adoption by stakeholders. In pursuance of the same, a Task Force was constituted by Ministry of Power, Govt. of India under the Chairmanship of Chairperson, CEA & comprising members from Utilities, IPPs/Developers, and consultants. The Construction Industry Development Council (CIDC) was engaged for the purpose. The draft document has been finalized and sent to MoP for acceptance. Key elements / concepts introduced in Standard Bidding Document (SBD) inter-alia include the following: i Risk Register: It is seen that delays in most of the hydro projects occur on account of contractual issues especially on account of risk sharing arising out of unforeseen situations. A proforma for risk register incorporating risk sharing/allocation of different types of risks generally encountered in hydro projects has been incorporated. It is expected that adoption of the proforma would reduce contractual disputes between the employer and the contractors to a large extent. ii Institutional Arbitration Mechanism: To ensure speedy and efficient dispute redressal, Institutional Dispute Resolution Mechanism has been proposed which is in line with emerging global best practices. Globally the increased emphasis on fair and timely determination of compensation events and claims has tilted the scales in favour of Institutional Arbitration Mechanisms that ensures a more accountable and transparent process for timely resolution of disputes. iii Other issues suitably incorporated / modified inter-alia include (cid:2) Claims towards idling of resources, (cid:2) Cost control, (cid:2) Procedures for claims, (cid:2) Price adjustment formulae, (cid:2) Incentive bonus, (cid:2) Payment upon termination / foreclosure of contract. iv. Review committee provision – Constitution of a review committee has been proposed for periodic revision of the SBD and other documents for mid-course correction. The Standard Bidding Document after getting legal vetting has been finalized and sent to MoP. • Standardization: Standard specification for steam generator and Turbine generator for 500MW and above with sub critical technology were prepared by CEA with a view to reduce the time in design & engineering and implementation of thermal projects. Standard specifications of super critical units and balance of plants are also under preparation. *****324 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Annexure 2.1 SUMMARY OF STATE-WISE SECTOR-WISE CAPACITY ADDITION TARGET/ACHIEVEMENT FOR 11TH PLAN TARGET AS PER MID- ACHIEVEMENT AS ON TARGET -78,700 MW TERM APPRAISAL (MTA)- 31.03.2012 62,374 MW Sl. No. STATE/ UTs C S S S P S TOTAL C S S S P S TOTAL C S S S P S TOTAL 1 DELHI 0 1500 0 1500 0 1500 108 1608 0 750 108 858 2 HARYANA 1500 1800 0 3300 1500 1800 0 3300 1000 1800 660 3460 3 HIMACHAL PRADESH 2763 210 1462 4435 751 0 1362 2113 0 0 1292 1292 4 JAMMU & KASHMIR 449 450 0 899 449 450 0 899 120 450 0 570 5 PUNJAB 0 500 0 500 0 500 0 500 0 500 0 500 6 RAJASTHAN 690 1790 1080 3560 690 1290 1080 3060 690 1290 540 2520 7 UTTAR PRADESH 980 2000 1600 4580 980 1000 1800 3780 980 250 2850 4080 8 UTTARAKHAND 1520 304 330 2154 400 304 0 704 400 304 0 704 9 CHANDIGARH 0 0 0 0 0 0 0 0 0 0 0 0 SUB TOTAL NORTHERN 7902 8554 4472 20928 4770 6844 4350 15964 3190 5344 5450 13984 10 CHHATTISGARH 3980 1750 1600 7330 2000 250 1600 3850 3320 250 1833 5403 11 GUJARAT 0 2782 2448 5230 0 2282 5248 7530 0 1090 7168 8258 12 MAHARASHTRA 1740 2500 1450 5690 740 2500 2110 5350 740 2500 2236 5476 13 MADHYA PRADESH 520 2210 400 3130 520 710 400 1630 520 710 0 1230 14 GOA 0 0 0 0 0 0 0 0 0 0 0 0 15 DAMAN & DIU 0 0 0 0 0 0 0 0 0 0 0 0 16 DADRA & NAGAR HAVELI 0 0 0 0 0 0 0 0 0 0 0 0 SUB TOTAL WESTERN 6240 9242 5898 21380 3260 5742 9358 18360 4580 4550 11237 20367 17 ANDHRA PRADESH 1000 3064 909 4973 1000 2204 1275 4479 1000 2154 1425 4579 18 KARNATAKA 440 1480 1615 3535 440 1480 1615 3535 440 1480 1800 3720 19 KERALA 0 160 0 160 0 100 0 100 0 100 0 100 20 TAMIL NADU 5000 1252 0 6252 4000 1952 0 5952 750 92 0 842 21 PUDUCHERRY 0 0 0 0 0 0 0 0 0 0 0 0 SUB TOTAL SOUTHERN 6440 5956 2524 14920 5440 5736 2890 14066 2190 3826 3225 9241 22 BIHAR 4390 0 0 4390 1000 0 0 1000 1000 0 0 1000 23 JHARKHAND 3050 0 0 3050 1500 0 1050 2550 1000 0 1050 2050 24 ORISSA 0 150 600 750 0 150 1200 1350 0 150 1800 1950 25 SIKKIM 510 0 1299 1809 510 0 699 1209 510 0 0 510 26 WEST BENGAL 4242 2720 250 7212 4242 2720 250 7212 2750 2720 250 5720 SUB TOTAL EASTERN 12192 2870 2149 17211 7252 2870 3199 13321 5260 2870 3100 11230 27 ARUNACHAL PRADESH 2600 0 0 2600 0 0 0 0 0 0 0 0 28 ASSAM 750 37 0 787 500 37 0 537 0 37 0 37 29 MANIPUR 0 0 0 0 0 0 0 0 0 0 0 0 30 MIZORAM 0 0 0 0 0 0 0 0 0 0 0 0 31 MEGHALYA 0 124 0 124 0 126 0 126 0 84 0 84 32 NAGALAND 0 0 0 0 0 0 0 0 0 0 0 0 33 TRIPURA 750 0 0 750 0 0 0 0 0 21 0 21 SUB TOTAL N.EASTERN 4100 161 0 4261 500 163 0 663 0 142 0 142 34 ANDMAN & NICOBAR ISLANDS 0 0 0 0 0 0 0 0 0 0 0 0 35 LAKSHDWEEP 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL 36874 26783 15043 78700 21222 21355 19797 62374 15220 16732 23012 54964 CS: Central Sector; SS: State Sector; PS: Private Sector¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 325 Annexure-2.2 LIST OF PROJECTS COMMISSIONED DURING 11TH PLAN Capa- Capa- city as city as FUEL Capacity Sl. No. PLANT NAME STATE AGENCY SEC-TOR STATUS CAPACI per per TYPE Commissioned TY (MW) 78,700 62,374 MW MW CENTRAL SECTOR CHANDRAPURA U- 1 JHARKHAND DVC C COMND COAL 500 500 500 500 7, 8 2 MEJIA U-6 WB DVC C COMND COAL 250 250 250 250 3 MEJIA PH II U 7, 8 WB DVC C COMND COAL 1000 1000 1000 1000 4 KODARMA U1 JHARKHAND DVC C COMND COAL 500 500 500 500 5 KODARMA U2 JHARKHAND DVC C UC COAL 500 500 500 DURGAPUR 6 WB DVC C COMND COAL 500 500 500 500 STEEL U1 DURGAPUR 7 WB DVC C COMND COAL 500 500 500 500 STEEL U2 RAGHUNATHPUR 8 WB DVC C UC COAL 1200 1200 1200 PH-I U1,2 BOKARO 9 JHARKHAND DVC C UC COAL 500 500 EXPANSION ARUNACHAL 10 KAMENG HEP NEEPCO C UC HYDRO 600 600 PRADESH OMKARESHWAR 11 MP NHDC C COMND HYDRO 520 520 520 520 HEP TEESTA V U 1,2,3 12 SIKKIM NHPC C COMND HYDRO 510 510 510 510 HEP SEWA-II U1,3,2 13 J&K NHPC C COMND HYDRO 120 120 120 120 HEP 14 CHAMERA-III HEP HP NHPC C UC HYDRO 231 231 231 15 PARBATI - II HEP HP NHPC C UC HYDRO 800 800 16 PARBATI - III HEP HP NHPC C UC HYDRO 520 520 520 17 URI-II HEP J&K NHPC C UC HYDRO 240 240 240 NIMOO BAZGO 18 J&K NHPC C UC HYDRO 45 45 45 HEP 19 CHUTAK HEP J&K NHPC C UC HYDRO 44 44 44 TEESTA LOW 20 WB NHPC C UC HYDRO 132 132 132 DAM-III HEP TEESTA LOW 21 WB NHPC C UC HYDRO 160 160 160 DAM-IV HEP SUBANSIRI ARUNACHAL 22 NHPC C UC HYDRO 2000 2000 LOWER HEP PRADESH BARSINGSAR LIG 23 RAJASTHAN NLC C COMND LIGNITE 250 250 250 250 U1,2 NEYVELI - II LIG 24 TN NLC C COMND LIGNITE 250 250 250 250 U1 NEYVELI - II LIG 25 TN NLC C UC LIGNITE 250 250 250 U2 26 TUTICORIN JV TN NLC C UC COAL 1000 1000 NUCL 27 KAIGA U-3,4 KARNATAKA NPC C COMND 440 440 440 440 EAR NUCL- 28 RAPP U-5,6 RAJASTHAN NPC C COMND 440 440 440 440 EAR KUDANKULAM U NUCL- 29 TN NPC C UC 2000 2000 2000 1,2 EAR PFBR NUCL- 30 TN NPC C UC 500 500 500 (Kalapakkam) EAR RATNAGIRI GAS/ 31 MAHARASHTRA NTPC C COMND 740 740 740 740 (DHABOL) JV LNG 32 SIPAT-II U4,5 CHHATTISGARH NTPC C COMND COAL 1000 1000 1000 1000326 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Capa- Capa- city as city as FUEL Capacity Sl. No. PLANT NAME STATE AGENCY SEC-TOR STATUS CAPACI per per TYPE Commissioned TY (MW) 78,700 62,374 MW MW 33 SIPAT-I U1,2 CHHATTISGARH NTPC C COMND COAL 1320 1320 1320 34 SIPAT I U3 CHHATTISGARH NTPC C UC COAL 660 660 35 BHILAI JV U 1,2 CHHATTISGARH NTPC C COMND COAL 500 500 500 500 36 KORBA III U-7 CHHATTISGARH NTPC C COMND COAL 500 500 500 500 KAHALGAON II 37 BIHAR NTPC C COMND COAL 1000 1000 1000 1000 U6,7 38 DADRI EXT U-5,6 UP NTPC C COMND COAL 980 980 980 980 INDIRA GANDHI 39 TPP (JHAJJAR) JV HARYANA NTPC C COMND COAL 1000 1000 1000 1000 U1,2 INDIRA GANDHI 40 TPP (JHAJJAR) JV HARYANA NTPC C UC COAL 500 500 500 U3 FARAKKA STAGE- 41 WB NTPC C COMND COAL 500 500 500 500 III U-6 SIMHADRI-EXT U- 42 AP NTPC C COMND COAL 1000 1000 1000 1000 3,4 BONGAIGAON TPP 43 ASSAM NTPC C UC COAL 750 750 500 U 1-3 LOHARI NAGPALA 44 UTTARAKHAND NTPC C UC HYDRO 600 600 HEP TAPOVAN 45 UTTARAKHAND NTPC C UC HYDRO 520 520 VISHNUGARH HEP 46 KOLDAM HEP HP NTPC C UC HYDRO 800 800 47 MAUDA TPP U1,2 MAHARASHTRA NTPC C UC COAL 1000 1000 48 BARH I U 1,2,3 BIHAR NTPC C UC COAL 1980 1980 49 BARH II U1 BIHAR NTPC C UC COAL 660 660 NABINAGAR JV U- 50 BIHAR NTPC C UC COAL 750 750 1,2,3 VALLUR 51 TN NTPC C COMND COAL 500 500 500 500 (ENNORE) JV U1 VALLUR 52 TN NTPC C UC COAL 500 500 500 (ENNORE) JV U2 TRIPURA GAS GAS/ 53 TRIPURA ONGC C UC 726 750 ILFS JV LNG 54 RAMPUR HEP HP SJVNL C UC HYDRO 412 412 KOTESHWAR U 1- 55 UTTARAKHAND THDC C COMND HYDRO 400 400 400 400 4 SUB TOTAL (CENTRAL 35824 21222 15220 SECTOR) STATE SECTOR JURALA PRIYA U 1 AP APGENCO S COMND HYDRO 234 234 234 234 1-6 RAYALSEEMA 2 AP APGENCO S COMND COAL 420 420 420 420 U4,5 VIJAYWADA TPP 3 AP APGENCO S COMND COAL 500 500 500 500 ST-IV, U1 4 KAKATIYA TPP AP APGENCO S COMND COAL 500 500 500 500 KOTHAGUDEM ST- 5 AP APGENCO S COMND COAL 500 500 500 500 VI NAGARJUNA 6 AP APGENCO S UC HYDRO 50 50 50 SAGAR TR LOWER JURALA 7 AP APGENCO S UC HYDRO 240 240 U1-6 HEP PULICHINTALA 8 AP APID S UC HYDRO 120 120 HEP¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 327 Capa- Capa- city as city as FUEL Capacity Sl. No. PLANT NAME STATE AGENCY SEC-TOR STATUS CAPACI per per TYPE Commissioned TY (MW) 78,700 62,374 MW MW 9 KAKATIYA EXT U1 AP APGENCO S UC COAL 500 500 GAS/ 10 LAKWA WH ASSAM APGCL S COMND 37.2 37.2 37.2 37.2 LNG KORBA EAST EXT 11 CHHATTISGARH CSEB S COMND COAL 250 250 250 250 U2 MARWAH TPP U 12 CHHATTISGARH CSEB S UC COAL 1000 1000 1,2 KORBA WEST EXT 13 CHHATTISGARH CSEB S UC COAL 500 500 PH III PRAGATI-III GAS/ 14 (BAWANA) GT-1,2 DELHI PPCL S COMND 750 750 750 750 LNG ST-1 PRAGATI-III GAS/ 15 (BAWANA) GT-3,4 DELHI PPCL S UC 750 750 750 LNG & ST-2 KUTCH LIGNITE 16 GUJARAT GSECL S COMND LIGNITE 75 75 75 75 TPS GAS/ 17 DHUVRAN ST GUJARAT GSECL S COMND 40 40 40 40 LNG UTRAN CCPP- GAS/ 18 GUJARAT GSECL S COMND 374 374 374 374 GT+ST LNG SURAT LIGNITE 19 GUJARAT GIPCL S COMND LIGNITE 250 250 250 250 EXT U3,4 20 UKAI EXT U6 GUJARAT GSECL S UC COAL 490 490 490 GAS/ 21 GSEG HAZIRA EXT GUJARAT GSECL S COMND 351 351 351 351 LNG GAS/ 22 PIPAVAV JV CCGT GUJARAT GSECL S UC 702 702 702 LNG 23 SIKKA TPP EXT GUJARAT GSECL S UC COAL 500 500 YAMUNA NAGAR 24 HARYANA HPGCL S COMND COAL 600 600 600 600 U1,2 RAJIV GANDHI 25 HARYANA HPGCL S COMND COAL 1200 1200 1200 1200 TPS (HISSAR) U1,2 26 UHL - III HEP HP HPJVVNL S UC HYDRO 100 100 SAWARA KUDDU 27 HP PVC S UC HYDRO 110 110 HEP BAGLIHAR-I U1,2,3 28 J&K JKPDC S COMND HYDRO 450 450 450 450 HEP VARAHI EXT U1,2 29 KARNATAKA KPCL S COMND HYDRO 230 230 230 230 HEP BELLARY TPP U 30 KARNATAKA KPCL S COMND COAL 1000 1000 1000 1000 1,2 31 RAICHUR U 8 KARNATAKA KPCL S COMND COAL 250 250 250 250 KUTIYADI EXT 32 KERALA KSEB S COMND HYDRO 100 100 100 100 U1,2 HEP 33 PALLIVASAL HEP KERALA KSEB S UC HYDRO 60 60 GHATGHAR PSS 34 MAHARASHTRA GOMID S COMND HYDRO 250 250 250 250 U1,2 35 PARAS EXT U1,2 MAHARASHTRA MSPGCL S COMND COAL 500 500 500 500 NEW PARLI EXT U- 36 MAHARASHTRA MSPGCL S COMND COAL 250 250 250 250 2 KHAPER KHEDA 37 MAHARASHTRA MSPGCL S COMND COAL 500 500 500 500 EXT BHUSAWAL TPP 38 MAHARASHTRA MSPGCL S COMND COAL 1000 1000 1000 1000 U4,5 39 MYNTDU St-I HEP MEGHALAYA MeSEB S COMND HYDRO 84 84 84 84 MYNTDU St-I ADDL 40 MEGHALAYA MeSEB S UC HYDRO 42 42 UNIT 41 NEW UMTRU HEP MEGHALAYA MeSEB S UC HYDRO 40 40328 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Capa- Capa- city as city as FUEL Capacity Sl. No. PLANT NAME STATE AGENCY SEC-TOR STATUS CAPACI per per TYPE Commissioned TY (MW) 78,700 62,374 MW MW BIRSINGHPUR 42 MP MPPGCL S COMND COAL 500 500 500 500 EXT 43 AMARKANTAK U-5 MP MPGENCO S COMND COAL 210 210 210 210 44 MALWA TPP U1,2 MP MPGENCO S UC COAL 1000 1000 SATPURA EXT U- 45 MP MPPGCL S UC COAL 500 500 1,2 BALIMELA HEP 46 ORISSA OHPC S COMND HYDRO 150 150 150 150 ST-II U7,8 47 GHTPP-II U-3,4 PUNJAB PSEB S COMND COAL 500 500 500 500 48 GIRAL LIGNITE U-2 RAJASTHAN RRVUNL S COMND LIGNITE 125 125 125 125 CHHABRA TPS U- 49 RAJASTHAN RRVUNL S COMND COAL 500 500 500 500 1,2 50 KOTA TPP U7 RAJASTHAN RRVUNL S COMND COAL 195 195 195 195 SURATGARH EXT 51 RAJASTHAN RRVUNL S COMND COAL 250 250 250 250 U6 GAS/ 52 DHOLPUR GT2+ST RAJASTHAN RRVUNL S COMND 220 220 220 220 LNG 53 KALISINDH TPS U1 RAJASTHAN RRVUNL S UC COAL 600 500 GAS/ 54 VALUTHUR EXT TN TNEB S COMND 92.2 92.2 92.2 92.2 LNG BHAWANI 55 TN TNEB S UC HYDRO 60 60 60 BARRAGE II & III 56 METTUR EXT U1 TN TNEB S UC COAL 600 500 600 NORTH CHENNAI 57 TN TNEB S UC COAL 1200 600 1200 EXT U1,2 GAS/ 58 BARAMURA GT TRI S COMND 21 21 LNG MANERI BHALI 59 UTTARAKHAND UJVNL S COMND HYDRO 304 304 304 304 HEP PARICHHA EXT U- 60 UP UPRVUNL S UC COAL 500 500 500 5,6 HARDUAGANJ 61 UP UPRVUNL S COMND COAL 250 250 250 250 EXT U-8 HARDUAGANJ 62 UP UPRVUNL S UC COAL 250 250 250 EXT U-9 63 ANPARA-D U1,2 UP UPRVUNL S UC COAL 1000 1000 64 PURLIA PSS WB WBSEB S COMND HYDRO 900 900 900 900 65 SAGARDIGHI U 1,2 WB WBPDCL S COMND COAL 600 600 600 600 66 SANTALDIH U5 WB WBPDCL S COMND COAL 250 250 250 250 SANTALDIH EXT- 67 WB WBPDCL S COMND COAL 250 250 250 250 U 6 BAKRESHWAR 68 WB WBPDCL S COMND COAL 420 420 420 420 U 4,5 DURGAPUR EXT 69 WB DPL S COMND COAL 300 300 300 300 U 7 SUB TOTAL 26783 21355 16732 (STATE SECTOR)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 329 Capa-- C Capacity city as Capacity Sl. FUEL CAPACITY as per PLANT NAME STATE AGENCY SECTOR STATUS per Commi- No. TYPE (MW) 62,374 78,700 ssioned MW MW PRIVATE SECTOR KONASEEMA GAS/ 1 KONASEEMA GT+ST AP P COMND 445 445 445 445 POWER LNG GAUTAMI GAS/ 2 GAUTAMI AP P COMND 464 464 464 464 POWER LNG KONDAPALLI CCPP PH-II GAS/ 3 AP LANCO P COMND 366 366 366 GT+ST LNG RAIGARH TPP PH-I, U-1, CHHATTIS JINDAL 4 P COMND COAL 1000 1000 1000 1000 2; PH II U 3,4 -GARH POWER LANCO AMARKANTAK CHHATTIS 5 LANCO P COMND COAL 600 600 600 600 U1,2 -GARH RITHALA CCPP GAS/ 6 DELHI NDPL P COMND 108.0 108.0 108.0 (GT1+GT2+ST) LNG SUGEN TORRENT GAS/ 7 GUJARAT TORRENT P COMND 1147.5 1128 1147.5 1147.5 BLOCK I, II & III LNG ADANI 8 MUNDRA TPP PH-I, U 1-4 GUJARAT P COMND COAL 1320 1320 1320 1320 POWER ADANI 9 MUNDRA TPP PH-II U1,2 GUJARAT P COMND COAL 1320 1320 1320 POWER ADANI 10 MUNDRA TPP PH-III U-1 GUJARAT P COMND COAL 660 660 660 POWER MUNDRA TPP PH-III U- ADANI 11 GUJARAT P COMND COAL 1320 1320 2,3 POWER ULTRA MEGA MUNDRA TATA 12 GUJARAT P COMND COAL 800 800 800 U1 POWER HYDR 13 ALLAIN DUHANGAN U1,2 HP ADHPL P COMND 192 192 192 192 O KARCHAM WANGTOO 14 HP JPKHCL P COMND HYDRO 1000 1000 1000 1000 U1-4 EVREST 15 MALANA HEP II U1,2 HP P COMND HYDRO 100 100 100 100 POWER 16 BUDHIL HEP HP LANCO P UC HYDRO 70 70 70 HIMACHAL 17 SORANG HEP HP SORANG P UC HYDRO 100 100 POWER 18 MAITHAN RBC JV U1,2* JHARKHAND IPP P COMND COAL 1050 1050 1050 1050 JSW 19 TORANGALLU U1,2 KARNATAKA P COMND COAL 600 600 600 600 ENERGY UDUPI TPP (LANCO 20 KARNATAKA NPCL P COMND COAL 1200 1015 1015 1200 NAGARJUNA) U1,2 MAHARASHT TATA 21 TROMBAY TPS P COMND COAL 250 250 250 250 RA POWER JSW ENERGY, MAHARASHT 22 JSW P COMND COAL 1200 1200 1200 1200 RATNAGIRI U1-4 RA TPS AT WARORA MAHARASHT WARDHA 23 P COMND COAL 540 540 U1,2,3,4 RA POWER CO. MAHARASHT ADANI 24 TIRODA TPP PH-I U1 P UC COAL 660 660 RA POWER 25 MAHESHWAR 1-10 MP SMHPCL P UC HYDRO 400 400 400 STERLITE 26 STERLITE TPP U 2,1 ORISSA P COMND COAL 1200 600 1200 1200 ENERGY STERLITE 27 STERLITE TPP U3 ORISSA P COMND COAL 600 600 ENERGY RAJ WEST 28 JALLIPA LIGNITE U 1-4 RAJASTHAN P COMND LIGNITE 540 540 540 540 POWER RAJ WEST 29 JALLIPA LIGNITE U 5-8 RAJASTHAN P UC LIGNITE 540 540 540 POWER TEESTA 30 TEESTA III SIKKIM P UC HYDRO 1200 1200 600 URJA330 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 31 CHUJACHEN SIKKIM GATI P UC HYDRO 99 99 99 UTTARAK- 32 SRINAGAR GVK P UC HYDRO 330 330 HAND Mahatma Gandhi 33 Haryana CLP P COMND COAL 660 (Jhajar)TPP U1 660 34 Kasaipalli TPP CHG ACB India P COMND COAL 135 135 35 S. V. Power TPP CHG S. V. Power P COMND COAL 63 63 Abhijeet 36 Mihan TPP MAH P COMND COAL 246 Energy 246 37 Katghoda TPP U1 CHG ACB India P COMND COAL 35 35 Simhapuri Energy Pvt Ltd Madhucan 38 AP P COMND COAL 150 U1 Projects 150 ESSAR 39 Salaya TPP U 1 GUJ P COMND COAL 600 POWER 600 RELIANCE 40 ROSA ST-I U1,2 UP P COMND COAL 600 600 600 600 POWER RELIANCE 41 ROSA ST-II U1,2 UP P COMND COAL 600 600 POWER 42 ANPARA-C U1,2 UP LANCO P COMND COAL 1200 1000 1200 1200 43 KHAMBRKHERA U 1,2 UP BAJAJ Energy P COMND COAL 90 90 44 MAQSOODPUR U 1,2 UP BAJAJ Energy P COMND COAL 90 90 45 BARKHERA TPP U 1,2 UP BAJAJ Energy P COMND COAL 90 90 46 KUNDARKI TPP U1,2 UP BAJAJ Energy P COMND COAL 90 90 47 Utrala TPP U1,2 UP BAJAJ Energy P COMND COAL 90 90 48 BUDGE-BUDGE EXT WB CESC P COMND COAL 250 250 250 250 SUB TOTAL (PRIVATE 16093 19797 23012 SECTOR) TOTAL (11TH PLAN) 78700 62374 54964 *Note: Maithon RBC (1050 MW) was considered in Central Sector in 78,700 MW Target. The project is now in Private Sector. C: Central Sector; S: State Sector; P: Private Sector; COMND: Commissioned; UC : Under Construction¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 331 Chapter 3 DEMAND PROJECTIONS FOR ELECTRICITY 3.0 BACKGROUND Demand assessment is an essential prerequisite for planning of generation capacity addition required to meet the future power requirement of various sectors of our economy. The type and location of projects planned is largely dependent on the magnitude, spatial distribution as well as the variation of demand during the day, seasons and on a yearly basis. Therefore, reliable planning for capacity addition for future is largely dependent on an accurate assessment of the future demand. The National Electricity Policy also stipulates that CEA, while formulating the National Electricity Plan, would include the Short-term and the Long Term demand forecast for different Regions. 3.1 DEMAND ASSESSMENT BY CENTRAL ELECTRICITY AUTHORITY – ELECTRIC POWER SURVEY (EPS REPORTS) The Electricity Power Survey Committee is constituted by CEA, with wide representation from the Stake-holders in the Power Sector, to forecast the demand for electricity both in terms of peak electric load and electrical energy requirement. CEA has been regularly bringing out the Electric Power Survey Reports. The latest Report by this Committee is the 18th EPS Report which is under print. This Report forecasted year-wise electricity demand for each State, Union Territory, Region and All India in detail up to the end of 12th Five Year Plan i.e. 2016-17 and projected the perspective electricity demand for the terminal years of 13th & 14th Plans i.e. year 2021-22 and year 2026-27 for the Utility systems. The impact of DSM and Energy Conservation Measures during the 12th and 13th Plans on the demand of the country has been suitably taken into account while finalizing the 18th EPS demand. The 18th EPS draft report which has been brought out now encompasses various features for fulfilling the Aims and Objectives of the National/ State Policies framed by the Government(s). Due consideration has been given while formulating the electricity demand forecasts to the promotion of high efficiency and DSM measures in the Agriculture, Industrial, Commercial sectors as well as in domestic establishments. Future projections of the EPS have also been worked out based on the T & D loss reduction targets assessed in consultation with various States/UTs. The Long Term Forecast is based on reducing T & D losses to 18.9% and 15.4% by 2016-17 and 2021-22 respectively. 3.2 DEMAND SCENARIOS A number of Demand Scenarios have been worked out and a choice is required to be made as to which of these demands is to be adopted for carrying out Planning studies for estimating the most accurate Generation Capacity addition Programme for the 12th and 13th Plans. The various possible Demand Scenarios analysed in this Chapter are as follows: Scenario: 1 Actual demand up to 2009-10 & then applying Actual Cumulative Growth Rate (CAGR) of past few years in 12th plan & EPS growth rate in 13th plan. Scenario: 2 Actual Demand up to 2009-10 with 9% GDP Growth Rate & 0.8 Elasticity during 12th & 13th Plans Scenario: 3 Actual Demand up to 2009-10 with 9% GDP Growth Rate & 0.9 Elasticity during 12th Plan and 0.8 Elasticity during 13th Plan. Scenario: 4 Actual Demand up to 2009-10 with 9% GDP Growth Rate & 0.95 Elasticity during 12th & 13th Plans.332 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Scenario: 5 Actual Demand up to 2009-10 with 9% GDP Growth Rate & 1.0 Elasticity during 12th Plan and 0.9 Elasticity during 13th Plan. Scenario: 6 18th EPS Demand Projections Details of Year-wise Energy Requirement projections by 12th & 13th Plan end are furnished in Table 3.1 & 3.2 below: TABLE 3.1 SCENARIOS OF ENERGY REQUIREMENT PROJECTIONS FOR 12th PLAN Sc.-1 GR Sc.-2 GR Sc.-3 GR Sc.-4 GR Sc.-5 GR Sc-6 Year Actual ER % Actual ER % Actual % Actual % Actual ER % 18th EPS (upto 2009- (upto 2009- ER (upto ER (upto (upto 10) with 10) & 9% 2009-10) 2009-10) 2009-10) & actual GDP; 0.8 & 9% & 9% 9% GDP; CAGR Elasticity GDP; 0.9 GDP; 1.0 Elasticity 0.95 Elasticity Elasticity Gwh Gwh Gwh Gwh Gwh 2003-04 559264 559264 559264 559264 559264 2004-05 591373 591373 591373 591373 591373 2005-06 631554 631554 631554 631554 631554 2006-07 690587 690587 690587 690587 690587 2007-08 739343 739343 739343 739343 739343 2008-09 777039 777039 777039 777039 777039 2009-10 830594 830594 830594 830594 830594 2010-11 890123 890397 897872 901610 905347 2011-12 953919 954505 970600 978697 986829 929111 2012-13 1022287 7.17 1023230 7.2 1049218 8.1 1062376 8.6 1075643 9.0 1007694 2013-14 1095555 1096902 1134205 1153209 1172451 1084610 2014-15 1174074 1175879 1226076 1251809 1277972 1167731 2015-16 1258221 1260543 1325388 1358838 1392989 1257589 2016-17 1348399 1351302 1432744 1475019 1518358 1354874 Table 3.2 SCENARIOS OF ENERGY REQUIREMENT PROJECTIONS FOR 13th PLAN Sc.-1 GR Sc.-2 GR Sc.3 GR Sc.-4 GR Sc.-5 G Sc.-6 R Year Actual % Actual ER % Actual % Actual % Actual ER % 18th EPS ER (upto 2009- ER (upto ER (upto (upto 2009- (upto 10) & 9% 2009-10) 2009-10) 10) & 9% 2009-10) GDP; 0.8 & 9% & 9% GDP; 0.9 with Elasticity GDP; 0.8 GDP; Elasticity EPS GR Elasticity 0.95 Elasticity Gwh Gwh Gwh Gwh Gwh 2017-18 1443326 7.1 1448595 7.2 1535902 7.2 1601133 8.6 1641345 8.1 1450982 2018-19 1544936 1552894 1646487 1738030 1774294 1552008 2019-20 1653700 1664703 1765034 1886631 1918012 1660783 2020-21 1770120 1784561 1892116 2047938 2073371 1778109 2021-22 1894736 1913050 2028348 2223037 2241314 1904861¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 333 The above projections do not include savings from DSM & EE measures whereas 18th EPS projections include these savings. The actual load factor in 2009-10 was 79.5 %. In the past, the demand has not grown as anticipated and due to various other reasons the decreasing trend of load factor as anticipated has not taken place. It would therefore be prudent that case of GDP growth rate Scenarios with a modest decline in load factor may be assumed. Therefore, a load factor of about 78% has been considered while estimating the peak demand for 2016-17. A Summary of Energy Requirement and Peak demand in the various Scenarios considered above and a Load factor of 78% upto 2016-17 & 76% upto 2021-22 is as follows: Table 3.3 VARIOUS DEMAND SCENARIOS - ENERGY REQUIREMENT AND PEAK DEMAND (WITHOUT EFFECT OF ENERGY CONSERVATION AND DSM MEASURES) GDP growth rates GDP / Electricity Energy require- Energy Peak Demand Peak Demand Elasticity ment (MkWh) requirement (MW) (MW) (MkWh) 2016-17 2021-22 2016-17 2021-22 Actual Energy 0.80 1351302 1913050 197767 287348 requirement 0.90/0.8 in 12th/13th 1432744 2028348 209686 304667 ( upto 2009-10) Plans with 9 % Growth 0.95 1475019 2223037 215873 333910 rate 1.0/0.9 in 12th/13th Plans 1518358 2241314 222216 336655 Actual Energy requirement 1348399 1894736 202535 284598 ( upto 2009-10) with actual Growth rates 18th EPS 1354874 1904861 199540 283470 Considering the savings in energy requirement and reduction in Peak Demand on account of BEE’s Energy Efficiency Measures and DSM programmes, a reduction of about 60 BU in Energy Requirement and about 12,000 MW in Peak Demand may be made at end of 12th Plan and a reduction of about 15,000 MW in Peak Demand may be made at end of 13th Plan in each of the above Scenarios (except 18th EPS). The Demand figures thus suitably modified are as given in the Table below: Table 3.4 VARIOUS DEMAND SCENARIOS - ENERGY REQUIREMENT AND PEAK DEMAND (CONSIDERING EFFECT OF ENERGY CONSERVATION AND DSM MEASURES) GDP growth rates GDP / Electricity Energy Energy Peak Demand Peak Demand Elasticity requirement requirement (MW) (MW) (MkWh) (MkWh) 2016-17 2021-22 2016-17 2021-22 Actual Energy 0.80 1321972 1877313 185967 272348 requirement 0.90/0.8 in 1403414 1992611 197686 289667 ( upto 2009-10) with 12th/13th Plans 9 % Growth rate 0.95 1445689 2187300 203873 318910 1.0/0.9 in 1489028 2205577 210216 321655 12th/13th Plans Actual Energy requirement 1319069 1858999 190535 269598 ( upto 2009-10) with actual Growth rates 18th EPS* 1354874 1904861 199540 283470 * Reduction in Peak Demand and Energy Requirement on account of BEE’s Energy Efficiency Measures and DSM programmes has not been reduced from 18th EPS figures as these have already been accounted for while arriving at 18th EPS Peak Demand & Energy Requirement. 3.3 RECOMMENDED DEMAND SCENARIO Of the Scenarios detailed above, the demand corresponding to 18th EPS projections has been considered for Generation Planning studies to assess capacity addition requirement for 12th and 13th plan periods.334 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] These demand estimates were considered since they are based on a detailed and systematic approach of load projections by the Electric Power Survey Committee comprising of various stakeholders. Partial end use method is adopted to make these forecasts. The demand forecasts make projections of unrestricted demand while accounting for nominal impact of Energy Efficiency and Demand Side Management measures. Generation Planning Studies based on unrestricted demand were considered to be prudent and desirable. However, additional impact of aggressive measures & other initiatives of BEE which take into account the structural changes taking place in the Power Sector on account of various initiatives of the Government have not been considered in this Scenario. The details of year-wise/ State-wise/Region-wise peak demand and energy requirement forecast corresponding to year 2012-13 to 2021-22 is given in Annexure 3.1. The long-term forecast for peak demand & energy requirement in the country by the end of 14th Plan (2026-27) is summarized in Table 3.5 below: Table 3.5 Long Term Projections for Year 2026-27 Region/Islands Energy Requirement (BU) Peak Load (GW) Northern Region 840.67 121.98 Western Region 757.32 120.62 Southern Region 727.91 118.76 Eastern Region 349.41 53.05 NE Region 33.95 6.17 A&N Islands 0.71 0.125 Lakshdeep 0.08 0.023 All-India 2710 400.7 Demand Projections as per 18th EPS Report to be adopted by 12th and 13th Plan end for the purpose of Generation Planning Exercise are as follows: Table 3.6 DEMAND ADOPTED FOR GENERATION PLANNING STUDIES Energy Requirement Gwh Peak Load (MW) 2016-17 1354874 199540 (12TH Plan end) 2021-22 1904861 283470 (13th Plan end) In the Integrated Energy Policy, Peak demand has been estimated assuming decreasing system load factor i.e. 76% up to 2010, 74% for 2011-12 to 2015-16, 72% for 2016-17 to 2020-21 and beyond and these demands are based on actual consumption up to 2004-05 and it also include Captive Demand. On the other hand 18th EPS demand projections have been based on actual demand up to 2009-10 and this corresponds to demand projections of utilities only. 18th EPS demand projections also have taken into account Demand Side Management and Energy Conservation measures as proposed by BEE. Therefore 18th EPS demand projections may be considered for purpose of Generation Planning 3.4 CONCLUSION • 18th EPS demand figures are to be adopted for assessing the 12th Plan Capacity addition Programme and the 13th Plan tentative capacity addition required, as the demand assessment by the EPS is a through exercise based on end use method involving all Stakeholders. • Optimum capacity addition for 12th and 13th Plans has been worked out considering 18th EPS demand figures. Thereafter, seasonal variation in demand has also been estimated (peak and off-peak) to ensure that the optimum capacity addition would meet the demand in all the seasons.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 335 Annexure 3.1 ALL INDIA & STATE WISE / UT WISE FORECAST Peak Electric Load at Power Station Bus Bars (Utilities Only) (U/R) 2012-13 to 2021-22 in MW 12th Plan 13th Plan State/Uts 2012-13 2013-14 2014-15 2015-16 2016-17 1017-18 2018-19 2019-20 2020-21 2021-22 Delhi 5290 5547 5818 6101 6398 6849 7335 7857 8419 9024 Haryana 7291 7944 8655 9429 10273 11006 11749 12526 13356 14244 Himachal Pradesh 1459 1558 1665 1778 1900 2022 2151 2288 2434 2589 Jammu & Kashmir 2471 2523 2577 2631 2687 2917 3180 3481 3825 4217 Punjab 10292 10770 11271 11794 12342 12826 13228 13648 14089 14552 Rajasthan 9396 10360 11422 12594 13886 14957 16004 17137 18364 19692 Uttar Pradesh 14152 15993 18073 20424 23081 25547 27832 30331 33067 36061 Uttrakhand 1716 1824 1938 2060 2189 2315 2449 2591 2741 2901 Chandigarh 352 370 387 406 426 450 475 501 529 559 Northern Region 44033 47758 51799 56181 60934 65686 70276 75238 80620 86461 Goa 622 666 712 762 815 880 949 1024 1105 1191 Gujarat 13047 14350 15782 17358 19091 20486 21942 23503 25177 26973 Chhattisgarh 3534 3792 4070 4367 4687 5028 5385 5755 6162 6599 Madhya Pradesh 10299 11102 11967 12899 13904 14934 15803 16734 17732 18802 Maharashtra 22368 23795 25313 26928 28645 29983 32122 34431 36926 39622 D. & N. Haveli 693 749 809 874 944 1006 1072 1142 1217 1297 Daman & Diu 380 394 409 425 441 469 500 533 567 605 Western Region 46909 50300 53936 57835 62015 65871 70383 75223 80441 86054 Andhra Pradesh 15553 17044 18681 20476 22445 24271 26246 28382 30693 33194 Karnataka 9742 10473 11258 12102 13010 13964 14945 16005 17159 18403 Kerala 3701 3922 4157 4405 4669 4931 5198 5479 5777 6093 Tamil Nadu 14174 15736 17497 19489 20816 22375 24057 25876 27838 29975 Pudducherry 533 555 579 604 630 659 690 722 754 782 Southern Region 39850 43623 47752 52273 57221 61525 66111 71063 76413 82199 Bihar 2843 3277 3777 4354 5018 5660 6398 7250 8236 9306 Jharkhand 3452 3727 4010 4301 4616 4948 5262 5598 5957 6341 Orissa 4397 4686 4994 5322 5672 5866 6066 6289 6515 6749 West Bengal 8289 9052 9887 10798 11793 12882 13964 15124 16369 17703 Sikkim 117 123 130 137 144 148 159 164 170 176 Eastern Region 16638 18291 20109 22106 24303 26320 28411 30710 33226 35928 Assam 1300 1414 1537 1671 1817 1946 2080 2222 2373 2534 Manipur 180 212 249 294 346 373 399 428 460 497 Meghalaya 338 362 388 415 445 475 505 529 551 596 Nagaland 145 154 164 174 185 201 216 233 251 271 Tripura 254 274 294 317 340 365 389 415 442 472 Arunachal Pradesh 111 117 123 129 135 142 150 158 167 177 Mizoram 174 197 223 252 285 302 314 325 338 352 North E. Region 2214 2382 2563 2757 2966 3169 3370 3579 3800 4056 Andman & Nicobar 59 61 63 65 67 71 75 79 84 89 Lakshadweep 8 9 10 10 11 12 14 15 16 18 All India 143967 156208 169491 183902 199540 214093 229465 246068 264041 283470336 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ALL INDIA & STATE WISE / UT WISE FORECAST Electrical Energy Requirement at Power Station Bus Bars (Utilities Only) (U/R) 2012-13 to 2021-22 in Million Units 12th Plan 13th Plan State/Uts 2012-13 2013-14 2014-15 2015-16 2016-17 1017-18 2018-19 2019-20 2020-21 2021-22 Delhi 29100 31011 33047 35217 37529 40176 43023 46085 49382 52930 Haryana 40750 44254 48060 52193 56681 60725 64820 69108 73688 78586 Himachal Pradesh 8974 9421 9891 10384 10901 11546 12228 12948 13710 14514 Jammu & Kashmir 14425 14872 15333 15808 16298 17180 18172 19282 20516 21884 Punjab 51595 55567 59844 64450 69410 73032 76245 79626 83186 86941 Rajasthan 54243 59382 65007 71166 77907 83914 89792 96149 103030 110483 Uttar Pradesh 93148 102924 113727 125664 138854 152571 164997 178488 193136 209046 Uttrakhand 10735 11207 11700 12214 12751 13466 14223 15025 15874 16774 Chandigarh 1767 1859 1956 2058 2165 2286 2414 2549 2692 2842 Northern Region 304737 330497 358565 389153 422498 454897 485914 519260 555214 594000 Goa 3641 3912 4204 4517 4853 5205 5572 5966 6386 6837 Gujarat 82331 88254 94603 101409 108704 116649 124937 133825 143360 153582 Chhattisgarh 17703 19146 20707 22396 24222 25989 27833 29743 31850 34106 Madhya Pradesh 56763 61448 66519 72010 77953 83988 89152 94699 100657 107060 Maharashtra 140736 147402 154383 161695 169353 175870 187034 199001 211836 225606 D. & N. Haveli 4977 5276 5593 5930 6286 6665 7064 7488 7937 8413 Daman & Diu 2375 2479 2587 2700 2817 2976 3143 3320 3508 3706 Western Region 308527 327917 348597 370655 394188 417342 444735 474042 505534 539310 Andhra Pradesh 93189 101231 109968 119458 129767 140324 151743 164093 177454 191912 Karnataka 58513 63001 67833 73036 78637 83917 89285 95059 101309 108012 Kerala 20516 21889 23354 24917 26584 28080 29595 31198 32895 34691 Tamil Nadu 91625 97865 104529 111648 119251 128177 137815 148237 159475 171718 Pudducherry 3024 3155 3293 3436 3586 3755 3929 4109 4295 4452 Southern Region 266867 287141 308977 332495 357826 384252 412367 442696 475426 510786 Bihar 16529 19096 22062 25489 29447 32964 36982 41590 46883 52975 Jharkhand 21309 22844 24407 25990 27691 29592 31381 33287 35318 37482 Orissa 26265 28374 30652 33113 35772 36999 38262 39667 41089 42566 West Bengal 51021 55288 59912 64923 70352 76511 82571 89033 95927 103283 Sikkim 440 461 482 504 528 544 581 601 622 645 Eastern Region 115564 126063 137515 150018 163790 176611 189777 204178 219839 236952 Assam 6392 6953 7562 8225 8947 9615 10313 11058 11852 12699 Manipur 737 840 956 1089 1241 1405 1571 1760 1975 2219 Meghalaya 1749 1861 1981 2108 2243 2396 2553 2678 2794 3029 Nagaland 692 725 760 796 834 895 954 1019 1088 1163 Tripura 1029 1112 1201 1297 1401 1514 1628 1751 1883 2026 Arunachal Pradesh 524 531 538 545 552 580 611 644 681 721 Mizoram 503 588 686 801 936 1031 1112 1196 1287 1388 North E. Region 11628 12609 13684 14862 16154 17435 18743 20106 21560 23244 Andman & Nicobar 328 337 347 356 366 390 415 443 473 505 Lakshadweep 43 45 47 49 52 55 57 59 62 65 All India 1007694 1084610 1167731 1257589 1354874 1450982 1552008 1660783 1778109 1904861¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 337 Chapter 4 INITIATIVES AND MEASURES FOR GHG MITIGATION 4.0 INTRODUCTION Human-induced climate change is posing a substantial threat to global development efforts. Therefore, global efforts to mitigate and moderate human-induced climate change are consistent with India’s national interest. At the macro- economy scale, India is a low-intensity producer of CO emissions with per capita CO emissions being among the 2 2 lowest in the world, at around 1.37 metric ton (MT) per person (Source: IEA World Energy Statistics-2011) compared with 4.29 metric ton per person for the world average and 16.9 metric ton per person for the United States. India also performs very well when compared to other economies in respect of CO intensity per capita GDP (tons of CO 2 2 emissions per unit of GDP). Having signed the 1992 UNFCCC convention, India affirms the principle of “common but differentiated responsibility” for climate change. The Initiative and Plans proposed by the Government’s Integrated Energy Policy Report are projected to keep CO 2 intensity declining while massively expanding rural access and increasing power generation to meet the demands of a rapidly-growing economy. India needs to evaluate and develop strategic options that address concern about changing climate without compromising – but rather reinforcing – its growth and development objectives, by facilitating additional investments and transfer of technology, India has significant opportunities to accelerate growth while controlling the carbon intensity of its development path. This can be achieved by harnessing the substantial synergies between “low carbon” and economic performance through improving the efficiency of electricity generation, reducing technical losses in the power sector, enhancing end-use energy efficiency in various sectors, developing hydropower and renewable potential, and accelerating the adoption of new technologies. Moreover, there are many development benefits that India can capture with a well-designed low-carbon strategy including energy security, rural access though distributed renewable applications and cleaner air in cities and homes. In short, a low carbon growth strategy could be an opportunity to improve health, productivity and quality of life. The National Action Plan on Climate Change (NAPCC) outlines India’s Strategy to meet the challenge of Climate change and to enhance the ecological sustainability of India’s development path. Eight National Missions form the core of the National Action Plan, representing multi-pronged, long term and integrated strategies for achieving key goals in the context of climate change, two out of which are National Solar Mission and Mission on Enhanced Energy Efficiency. Choice of fuel for power generation is an important factor to mitigate GHG emission. Renewable energy sources being benign sources are being encouraged to the maximum extent possible. In case of conventional sources, hydro and nuclear are the preferred options. Gas is preferred to coal and lignite for power generation. In case of coal based generation, technology options with higher efficiency are being encouraged since there is an inverse correlation between efficiency and carbon emission. Details of CO emission for different types of power plants are as follows: 2 Type of Power Plant Specific CO emission 2 T CO /MWh 2 Coal 1.04 Lignite 1.28 Gas-CC 0.43 Gas-OC 0.66 Gas Engine (Elect only) 0.46 Gas Engine (CHP) 0.22 Oil 0.66 Diesel Eng 0.59 Diesel OC 0.69 Naptha 0.61 Hydro 0 Nuclear 0 Wind 0 Solar 0338 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] There has not been any major change in basic power generation technology since its invention except improvement in efficiency. Even today, a substantial amount of heat energy of coal is wasted in the power generation process. To meet the rising demand for power, it would have to go for major technological innovation so that maximum energy available from fossils fuel is converted to electrical energy. This would pose a challenge to engineers and technicians on the means to tackle environmental degradation. Another problem dogging the thermal power stations is the proportion of ash content in coal and stringent environmental norms for emissions. The thermal generation today, is causing atmospheric pollution through the emission of carbon dioxide, carbon monoxide, nitrous oxide (nox) and sulphur dioxide (sox). New technology to reduce GHG has to be developed. This is a big challenge for engineers and technologists all over the world. 4.1 CARBON EMISSIONS FROM GENERATION - EXISTING STATUS As per IEA Energy Statistics - 2011 report, India’s per capita Carbon dioxide emission is only 1.37 tonnes per person which is amongst the lowest in the world. The world average per capita Carbon dioxide emission is around 4.29 tones and highest being 16.9 tones for USA. India’s contribution is around 4% of the world total CO Emission. 2 The Installed generating capacity of India is around 2, 09,276 MW at the end of October, 2012. Installed capacity based on thermal generation is around 67% of which coal constitutes about 85 %. Table 4.1 below shows the weighted average specific emissions for fossil fuel power stations in the five regional grids of the country. It is evident that coal and lignite have highest emission rate (tCO /MWh) among various fossil fuels. 2 Table 4.1 Weighted average specific emissions for fossil fuel-fired stations in FY 2010-11 (Figures in tCo /MWh) 2 Coal Diesel Gas Lignite Naphtha Oil India 1.06 0.55 0.44 1.44 0.39 0.64 (All figures are based on Net Generation) It may be mentioned that India’s Co emission rate (tCo /Mwh) has been reducing during the period 2008-09 to 2010- 2 2 11. The trend of Weighted Average Emission Rate is indicated in following Table and Graph. Table 4.2 Weighted Average Emission Rate (tCo /Mwh) (incl. imports) 2 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 0.85 0.84 0.81 0.80 0.79 0.82 0.81 0.79¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 339 Figure 4.1 Weighted Average Emission Rate tCO2/Mwh 0.86 0.84 0.85 0.84 0.82 0.82 0.81 0.8 0.8 0.81 0.79 0.78 0.79 0.76 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 Year 4.2 INITIATIVES/ MEASURES Major Initiatives being taken to develop the power generation sector pertain to increasing the efficiency of coal based power stations. These are as follows: • Increase of unit size with higher steam parameters. • Technology Development – Adoption of higher unit size & Clean Coal technologies (cid:1) Supercritical Technology – 2 percent point efficiency gain possible (cid:1) Ultra Supercritical Technology –additional efficiency 0.75% over 800 MW supercritical (cid:1) Integrated Gasification Technology – higher efficiency of 40-45% • R & M and Life Extension of old power stations – Benefits of CDM to be extended to overcome fund constraints • Energy Efficiency improvement • Retirement of old inefficient units • Coal quality Improvement Other measures include • Reduction in T & D losses – All India T&D losses- 28.65% in 2006-07. Aim to bring down to 15% • Efficiency in use of energy • Setting up of pithead stations for reduction in transportation of coal The benefits from reduction in T&D losses will be discussed in the Volume-II of the Plan. % Weighted Average Emission Rate tCO2/Mwh340 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 4.2.1 Increase in Unit Size with Higher Steam Parameters The Indian Power Sector has witnessed rapid technological development over the last few decades. The largest size unit of coal based plant which was a mere 30 MW in 1950s, rapidly increased to 60 MW in 60s, and 110/120/140 MW in 70s. Thereafter, 200 MW units of Russian (LMZ) were introduced in 1977 and of Siemens KWU design in 1983. The 500 MW units were introduced in 1984. The increase in unit size was associated with corresponding increase in steam parameters (Pressure and Temperature) and efficiency. Enhanced efficiency implies lesser GHG emission. The improvement in steam parameters and design efficiency of various units are indicated in Table 4.3 below: Table-4.3 Various Unit Sizes and main parameters Unit Size M/s. Pressure MS/RH Temperature Gross Design Efficiency MW kg/cm2 oC (%) 30-50 60 482 28.20 60-100 90 535 31.30 210 LMZ 130 535/535 35.63 210 KWU 150 535/535 37.04 250 150 535/535 38.3 500 169 538/538 38.6 660 247 538/565 39.5 565/593 40.5 800 247 565/593 40.5 Today 210/250 MW and 500 MW units form the backbone of Indian power industry and constitute over 75 % of total coal based installed capacity. During the 11th Plan, 8 nos of 660 MW supercritical units and one 800 MW unit totalling to 6080 MW have been commissioned. During the 12th Plan, it is being planned that the percentage of 660 MW and 800 MW unit sizes with Supercritical technology would still increase further and during the 13th Plan, all new coal based capacity is likely to be on supercritical technology only. Power generation using gas turbines as prime movers started in a big way around the world in early 1960s & 70s. This was basically due to advancement of technology as new and better heat resistant alloys were manufactured enabling higher firing temperatures, consequently higher cycle efficiencies. The Gas Turbines (GTs) are normally manufactured in standard sizes based on development of manufacturing technologies. GTs are now available up to 250 MW range. The open cycle operation typically achieves a generation efficiency of about 35% and about 53% in combined cycle mode. Since Gas Turbines use cleaner fuels (natural gas, LNG, distillate oil, Naphtha), GT based plants are more environment friendly mode of power generation. There is a need to encourage setting up of gas based plants during 12th Plan and beyond to meet part of the capacity addition requirements. The availability of gas, has, however been a major issue adversely affecting the operation of existing gas turbine stations at optimum capacity. Development of new Gas based power plants will depend on the availability of natural gas in the country. 4.2.2 Introduction of Clean Coal Technologies Supercritical Technology: Supercritical technology is being introduced to further enhance the efficiency of coal fired thermal generation. With the advancements in metallurgy and availability of better materials, adoption of higher parameters beyond the critical points has become possible. With the adoption of higher parameters, efficiency gain of about 2 % is possible over sub critical units, thereby, reducing emissions of CO2, NOx and SOx. Depending on the steam parameters adopted, supercritical technology can lead to about 4 % coal savings and corresponding reduction in emissions as compared to¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 341 conventional sub-critical units. Already many supercritical units of 660 and 800 MW are under construction in Central, State and Private Sector and 8 nos of 660 MW supercritical units and one 800 MW unit totalling to 6080 MW have already been commissioned during 11th Plan. Initial supercritical units in the country were based on steam parameters of 246 kg/cm2, 535/565 deg C at turbine inlet but some of the units which have recently started construction have adopted higher steam temperatures of 565/593 deg C resulting in higher efficiency. Supercritical technology has been made mandatory for Ultra Mega Projects being implemented. BHEL have already entered into collaboration with M/s Alstom and Siemens for manufacturing of super-critical boilers and turbo-generators respectively. With the view to enhance the indigenous manufacturing capability, efforts have been made to attract International manufacturers for taking up the equipment manufacturing in India. Already, L&T have formed JV companies with MHI Japan to manufacture super-critical boilers and turbines in India. Bharat Forge- Alstom, JSW-Toshiba Thermax -Babcock and GB industries-Ansaldo are other joint ventures set up for manufacture of supercritical power equipment in the country. A proposal for bulk ordering of eleven numbers supercritical units of 660 MW for various projects of NTPC and DVC has been approved by GOI . The proposal envisages mandatory conditions of the suppliers setting up manufacture of super-critical units in the country. This would ensure few initial orders for the new joint ventures being set up to kick- start indigenous manufacturing. The order for bulk tendering of 9 projects having 11 such 660 MW units have been placed and for remaining 2 projects order is expected shortly. Bulk tendering with mandatory phased indigenous manufacturing for 800 MW units is under process. Setting up of indigenous production facilities for supercritical plants and increase in indigenous components of such units is expected to bring down their cost in future. It is expected that during the 12th Plan, the total coal based capacity addition would be about 69,280 MW out of which 24,920 MW (36%) is based on supercritical units. Ultra Supercritical Technology Ultra supercritical technology refers to adoption of still higher steam temperatures of 600/600 deg C. Ultra supercritical technology has already been adopted in Japan and some European countries. Some latest units in China are also stated to be based on ultra-supercritical technology. International efforts are also underway to further increase the steam temperatures to 700 deg C and necessary technology development is being undertaken through various R&D programmes. The 700 deg C plants are slated to achieve an efficiency of over 50%. In the Indian scenario, large capacity induction of supercritical units would have taken place by the end of 12th plan, and significant manufacturing capacity of supercritical units would be achieved through BHEL and other JV companies coming up in this area. Thus introduction of ultra supercritical technology with steam parameters of about 600/600-620 deg C could be considered for specific sites based on relative techno-economics. Further, the International partners of new JVs are manufacturers of ultra supercritical plants and could stimulate the introduction of this technology in India in 13th Plan. Circulating Fluidized Bed Combustion. (CFBC) Technology CFBC technology has selectively been applied in India for firing high sulphur refinery residues, lignite etc. A number of 125 MW CFBC units have been installed for firing high sulphur lignite. Neyveli Lignite Corporation is installing 250 MW CFBC boilers for their NLC TPS II expansion project. Complete technology know how and commercial arrangement (licensee) of CFBC exist in the country and CFBC boilers of upto 250 MW are being manufactured indigenously. IGCC Technology The IGCC (integrated gasification combined cycle) technology refers to power generation through gasification of coal in gasifiers wherein the syngas is generated which after cleaning is used in gas turbine combined cycle systems to generate power. Presently, efficiency of IGCC plants internationally is comparable to those of supercritical plants but the technology has the potential to achieve higher efficiency than the conventional pulverized coal technology. IGCC has been adopted internationally for very low ash coals or petroleum based fuels. With low gas and petroleum based fuels availability in the country, our efforts are mostly centered on technologies, which can use Indian high ash coals. International cooperation in developing IGCC technology is being sought using typical high ash Indian coals342 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] which are presently being used for power generation in our Thermal Power Stations. Action has also been initiated for developing IGCC technology indigenously. BHEL have been doing research on gasification of Indian coals and have signed an MOU with APGENCO to set up 125 MW IGCC based plant. However, the results of the past studies do not indicate any improvement in efficiency with IGCC technology due to high ash contents of Indian coal. 4.2.3 Renovation and Modernisation of Thermal Power Stations Background Renovation and Modernisation (R&M) and Life Extension (LE) of existing old power stations provide an opportunity to get additional generation at low cost in short gestation period. Besides generation improvement, it results in improvement of environmental emissions and improvement in availability, safety and reliability. The Indian power sector has immense potential of reducing carbon dioxide emission by way of Renovation and Modernization schemes as some of the plants are old and are operating at a low efficiency. Benefits of CDM can be extended to overcome the fund constraints for the various R & M schemes, especially for energy efficiency improvements, as these schemes would mitigate carbon dioxide emissions and save fossil fuel. R&M programme was initiated in 1984 as a centrally sponsored programme for 34 numbers of thermal power stations covering 163 thermal units in the country. The programme was successfully completed in the year 1992 and an additional generation of about 10,000 MU/ annum was achieved. The Phase-II R&M programme for 44 numbers of thermal power stations was taken up in the year 1990-91. Power Finance Corporation (PFC) was to provide loan assistance to the State Electricity Boards (SEBs) for the R&M works. However, this programme could not progress as per schedule mainly due to non-availability of funds and poor financial conditions of State Electricity Boards (SEBs). The R&M programme continued to be implemented during 8th, 9th, 10th and 11th Plan periods but met with limited success during 10th Plan onwards due to various reasons such as non-availability of units for shut down, delayed supply of materials, fund constraint, lack of agencies to undertake R&M works etc. 4.2.3.1 Formulation of R&M / LE programme & Achievement during 11th Plan A Summary of Programme & tentative Achievement during 11th Plan is given in Table below. LE/R&M Programme-Achievement during 11th Plan (2007 – 2012) Sl Particular State Sector Central Sector Total (State sector + No. Central Sector) No. of Capacity No. of units Capacity No. of units Capacity units (MW) (MW) (MW) 1. LE works (Programme) 33 4524 20 2794 53 7318 (Achievement) 10 1024 3 267 13 1291 2. R&M works (Programme) 27 6015 49 12950 76 18965 (Achievement) 20 4485 39 10370 59 14855 Total (Programme) 60 10539 69 15744 129 26283 (Achievement) 30 5509 42 10637 72 16146¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 343 Programme for 12th Plan Under 12th Plan, life extension works have been identified on 70 thermal units of total capacity 12066 MW. This includes 38 units (6820 MW) from state sector and 32 units (5246 MW) from central sector. Out of these 32 number central sector units, NTPC units are 28 numbers (4406 MW) and DVC units are 4 numbers (840 MW). In addition to above, R&M works have also identified on 65 units (17301 MW) during 12th plan, out of this 37 units (12890 MW) are from NTPC, 8 units (261 MW) are from NEEPCO and balance 20 units ( 4150 MW) from state power utilities. Table 4.5 R&M/ LE Programme of Thermal Units during 12th Plan (2012 – 2017) Sl Particular State Sector Central Sector Total (State sector + No. Central Sector) No. of Capacity No. of Capacity No. of Capacity units (MW) units (MW) units (MW) 1. LE works 38 6820 32 5246 70 12066 2. R&M works 20 4150 45 13151 65 17301 Total 58 10970 77 18397 135 29367 of LE/R&M The list of units identified for life extension and R&M during 12th Plan are given at Annexure-4.1 and 4.2 respectively. Potential candidate units for LE and R&M works during 13th Plan (2017—2022) The Summary of 13th Plan R&M/LE programme is given in Table 4.6 below: Table 4.6 13TH PLAN R&M/LE PROGRAMME (POTENTIAL CANDIDATE UNITS) Name of the State Sector Central Sector Total identified units (State Programme + Central Sector) during 13th Plan No. of Units Capacity No. of Units Capacity No. of Units Capacity (MW) (MW) (MW) LE Coal 55 12130 16 3940 71 16070 Gas 6 672 5 765.71 11 1438 Sub Total 61 12802 21 4706 82 17508 R&M Coal 16 3560 6 2420 22 5980 Gas 6 1172 6 1172 Sub Total 16 3560 12 3592 28 7152 Grand Total 77 16362 33 8298 110 24660 Future vision for R&M Programme So far, R&M activities were confined to old, small size units to sustain their operation, improve plant availability and extend their operating life. However, such units are highly inefficient and beset with various operational problems. It is aimed at gradually decommissioning such units.344 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Today, 200/210/250MW/300MW and 500 MW units (61655 MW) consisting of 81 % of coal/lignite based installed capacity form the backbone of Indian Power sector. A large number of 200/210 MW machines and few 500 MW machines are in operation for 15-25 years or more. Such machines through efficiency integrated R&M provide a good opportunity for performance enhancement through technology intensive R&M. Plant specific energy audit studies and techno-economic analysis are proposed to be carried out for defining & implementation of efficiency integrated R&M/LE scheme. At present, three power stations viz., Bokaro 'B' TPS (3x210MW), Kolaghat TPS (3x210MW) and Nasik TPS Unit-3 (1x210MW) have been identified for efficiency integrated R&M study through bilateral cooperation with German Government. Contract has been awarded for preparation of Feasibility Study for all the above units. Further, few units such as Bandel TPS Unit-5 (210MW) and Koradi TPS Unit-1 (210MW) and Panipat TPS (2x110MW) have also been identified for efficiency integrated R&M through World Bank assistance. LOA has been issued to M/s Doosan Heavy Industries & Construction Co. Ltd. for main plant package for Bandel TPS Unit -5. In case of Koradi TPS unit-6 Bid have been received and is under evaluation. After detail study techno-economic viability for life extension of unit 3&4 of Panipat TPS could not be established and HPGCL Board decided not to undertake R&M works in these units. The Energy Efficient R&M programme through external assistance is intended to be taken up in few more units also. Technical assistance to CEA by the World Bank for the efficiency enhanced R&M The World Bank is providing technical assistance of US $ 1.1 million as a part of GEF grant under Coal Fired Generation Rehabilitation Project to CEA for addressing the barriers to energy efficient R&M in India. The scheme would be implemented through appointment of consultants for carrying out studies related to reduction of barriers to R&M interventions in India, developing market for implementations and strengthening institutional capacity at CEA in the field of R&M. All the consultants have been appointed. 4.2.4 Renovation, Modernisation & Uprating of Hydro Electric Power Projects Renovation & Modernisation, Life Extension and Up rating (RM&U) of existing old hydro electric power projects is considered a good option, as this is cost effective and quicker to achieve than setting up of green field hydro power projects. In order to augment the hydro generation and improve the availability of existing hydro power projects, Government of India has laid emphasis on R&M of various existing hydro electric power projects in the country. Recognising the benefits of the R&M of hydroelectric power projects, Govt. of India set up a National Committee in 1987 and a Standing Committee in 1998 thereafter, these have identified the projects/ schemes to be taken up for implementation under R&M. The National Perspective Plan document for R&M of hydro electric power projects in the country was also prepared in CEA during the year 2000, incorporating the status of various projects/schemes already identified for implementation/ completion till the end of the 11th Plan, i.e. the year 2011-12. The summary of 11th Plan is given in Table 4.7 A Summary of the 12th Plan programme for hydro R&M, Life Extension & Uprating Schemes and of the projects planned, completed and on which work is ongoing in the 12th Plan is as furnished in Table 4.8 below. Table 4.7 SUMMARY OF R&M, LIFE EXTENSION & UPRATING PROGRAMME AND ACHIEVEMENTS FOR 11TH PLAN - HYDRO Description R&M LE & Uprating No. of Projects Covered 13 5 Capacity (MW) 3363.2 1458.00 Estimated Cost (Rs. Crores) 412.83 Expenditure incurred (Rs. Crores) till 31.03.2012 294.84 Targeted Benefits (MW ) - 826 Actual Benefits achieved - 735¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 345 Table 4.8 SUMMARY OF R&M AND LIFE EXTENSION PROGRAMME AND ACHIEVEMENTS FOR 12TH PLAN – HYDRO Description R&M LE & Uprating No. of projects Covered 7 36 Capacity (MW) 2583.25 4084.50 Estimated Cost (Rs. Crores) 4433.67 Expenditure incurred (Rs. Crores) till 994.72 31.03.2012 Targeted Benefits (MW) - 3773.25 Actual Benefits achieved - - Abbreviations: MW – Mega Watt; Res. – Restoration; U – Uprating; LE – Life Extension The details of Hydro projects considered for R&M during 12th plan are given in Annexure-4.3 4.2.5 Retirement of Old and Inefficient Thermal Plants Retirement of Old and Inefficient thermal Plants and replacing them with new and more efficient units is an effective way of using the fuel and minimizing GHG Emissions. During the 11th Plan, 3,000 MW of capacity was targeted to be retired. This comprised of coal and lignite units of unit size lesser than 100 MW. During the 12th Plan, a capacity of about 4,000 MW has been proposed to be retired which includes the remaining units of coal & lignite under 100 MW size, gas plants more than 30 years old (1987 & before) and some coal units of 110 MW capacity. During the 13th Plan, retirement of 4,000 MW capacity has been considered which includes all coal units lesser than 200 MW (commissioned before 1982) and gas units commissioned before 1992 (more than 20 years old). 4.2.6 Generation and Energy Efficiency Measures In a scenario where India tries to accelerate its development process and cope up with increasing energy demands, conservation and energy efficiency measures are to play a central role in our energy policy. A national movement for energy conservation can significantly reduce the need for fresh investment in energy supply systems in coming years. It is imperative that all-out efforts are made to realize this potential. Energy conservation is an objective to which all the citizen in the country can contribute. Whether a household or a factory, a small shop or a large commercial building, a farmer or a office worker, every user and producer of energy can and must make this effort for his own benefit, as well as that of the nation. Government of India has already enacted Energy Conservation Act ,2001 (EC Act) which provides much needed legal framework and institutional arrangement for promotion of energy efficiency in all sectors of economy. Under this EC Act, Thermal Power Stations have already been declared as Designated Consumers vide Government notification dated 19.3.2007. Following are some of the relevant provisions under the EC Act for Power Stations as designated consumers: 1. To designate or appoint energy manager in charge of the activities of energy efficiency and conservation; 2. To get Energy Audit conducted by an accredited energy auditor ; 3. Furnish information with regard to the energy consumed and action taken on the recommendation of accredited energy auditors ; 4. Comply with the norms of energy consumption. Central Electricity Authority has also initiated action on creation of Energy Efficiency Cells at all the thermal Power Stations. Central Electricity Authority in collaboration with346 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] M/s GIZ, Germany has also finalized the training needs required by these cells under Indo-German Energy programme (IGEN). Various regional workshops/seminars on Energy Efficiency are being held for effective working of these Energy Efficiency cell under IGEN programme. In order to deal with the complex operational problems of the power stations in the country with incorporation of state of the art technologies and with a view to enhance the efficiency of the operating power stations, it was proposed, under Indo German Energy Forum to setup an Excellence Enhancement Centre (EEC) for Indian Power sector. The implementation agreement between CEA, BEE and GIZ was signed on 8th September,2011. The objectives of EEC are as follows: a. To share best practices in all areas of power sector and providing broad based expertise. b. To raise awareness of the need for excellence. c. To provide a solid network for interaction with industry for platform for technological development and to provide a focal point of contact for the whole power sector. d. To identify common challenges, developing common solutions and joint action plans for power sector. e. To provide a platform for the top Experts in Power Sector. Excellence Enhancement Centre has been registered as a society under Societies Registration Act no XXI of 1860 as applicable to National Capital Territory of Delhi on 16th November,2010 The centre has started its operation from CBIP building , Malcha Marg, Chanakyapuri, New Delhi. Chairperson,. CEA is the President of the Governing Body of EEC. The Governing body of the Society comprises members from CEA, NTPC, BEE, VGB, Germany and GIZ. GIZ, Germany is assisting the activities of the proposed EEC through funding from BMU, Germany. VGB, Germany shall be assisting EEC by sharing of knowledge and expertise available in Germany and other EU countries. EEC is non profit member driven society. The membership drive is in progress. Many organizations like BHEL.J&K Power Development Corporation, NTPC, Hitachi, EON, Steag Ratnagiri power, CPRI etc have already approached EEC for membership. EEC has already short listed the topics which will be taken initially. The EEC has already organized one National Workshop in New Delhi and one regional workshop at Kolkata on the topic of PAT Scheme .More regional workshops are being proposed to be held in near future at Jaipur, Hyderabad, Bangalore and Chandigarh etc. 4.2.7 Efficient Use of Resources Efficiency in the use of resources is an important factor as it promotes more productive output from limited resources as well as it reduces the carbon footprint on the environment. Cogeneration is the use of a heat engine or a power station to simultaneously generate both electricity and useful heat. Cogeneration is a thermodynamically efficient use of fuel. Conventional power plants emit the heat created as a by- product of electricity generation into the environment through cooling towers, flue gas, or by other means. Combined Heat and Power (CHP) captures the by-product heat for domestic or industrial heating purposes. CHP is most efficient when the heat can be used on site or very close to it. Overall efficiency is reduced when the heat must be transported over longer distances. Combined Cooling, Heating and Power (CCHP) Large industrial units such as cement plants, chemical industries, textile plants, etc have, for several years, been drawing power from their captive power plants. Many of these units have also gone in for waste heat recovery to meet the needs of process steam or chilling. In the last few years, there has also been a rise in the number of large commercial buildings in the form of IT complexes, multiplexes, data centres, modern airports, etc that have a tremendous amount of power requirement. As these buildings are fully air-conditioned, the power intensity is extremely high. Due to their concentrated load and the possibility of using part of their air-conditioning loads from the waste heat, they are ideal candidates for combined heat¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 347 and cooling solutions. Also due to the varying nature of their loads, they demand a high degree of operational flexibility. It should be made mandatory for commercial consumers with loads exceeding 25 MW, to generate power in situ and to demonstrate a minimum thermal efficiency of 60%. Ensuring compliance will not be too difficult, given the incentives cited above. CHP plants can be set up by the building owner as a captive power plant. Or several such buildings can come together and form a group-captive power plant. Energy from such plants would be viewed as ‘deemed renewable energy” and the generators allowed feed-in rights to export the excess power to the grid or to power exchanges. An equal, if not greater, opportunity presents itself in the use of (clean) natural gas for such “within the fence” CCHP plants. By carefully calibrating the allocation and restricting the use of natural gas to CHP applications that can offer an efficiency of at least 60%. 4.2.8 Distributed Generation Distributed Generation is the location of generation scattered throughout all areas/states. Most often this generation would be from Wind, biogas, Solar or gas/ diesel engines. The major advantages of Distributed Generation are as follows: • Low transmission losses Distributed flexible generation is located close to consumption and load centres. Transmission losses are, therefore, minimised. • Low transmission investments Transmission investments are minimised, compared with the Rs 1 crore/MW needed to build the transmission line system associated with a UMPP. • Rapid capacity addition It enables a paradigm shift from large plants to more number of smaller plants, say in the range of 25-200 MW. They enable quick capacity addition. These plants generally use standardised power generating blocks, and deploy far higher extent of prefabrication and modularisation. Due to this, the time of site work is greatly reduced, and thus, time-to-start up is much shorter. • Lower physical vulnerability, and risk mitigation Distributed generation, apart from increasing reliability, improving quality, reducing transmission costs, reducing right-of-way acquisition costs, etc, lowers the vulnerability of the electricity system, by spreading the points of generation over a wider geographical area. If large centralised plants are affected by natural disasters or acts of terrorism, the impact can be immediate and much higher, as large chunks of power supplies drop out of the system. Distributed plants that ensure generation in smaller chunks from different sites removes this weakness and improves the resilience of the system. Urban agglomerations having several installations of highly sensitive or strategic importance will particularly benefit from the risk mitigation that such distributed flexible generation offers. • Quicker financial closure Project investments are smaller, and thus can be financially closed much faster. • Smallest land requirement, lowest water use Distributed generation technologies help in reducing the area footprint per MW significantly. They also do not consume much water and do not cause strain on natural resources. • Better Grid support Distributed generation provides better grid support, and islanding schemes can insulate load centres from cascade tripping.348 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 4.2.9 Coal Quality Improvement: Coal characteristics have a significant impact on the power plant performance. Indian coal available for power generation is by and large of poor quality with high ash content leading to low efficiencies of the power plants. The average Gross Calorific Value of the coal available for Indian power plant is in the range of 3000.- 4500 Kcal/kg with ash content as high as 40%. The use of Beneficiated coal either by coal washing or blending with low ash imported coal is being done at some of the stations. The use of beneficiated coal will not only improve the performance of the plant leading to low carbon emissions but also would reduce the over all operation and maintenance costs. Many stations have started using washed coal and are in process of blending with imported coal thereby improving their plant performance. Ministry of Environment & Forests have issued a notification requiring thermal power stations located 1000 kms. from pit heads or those located in urban, sensitive and critically polluted areas to use raw or blended or beneficiated coal with ash content not exceeding 34% on an annual average basis. Indian coals are less amenable to washing and are characterized as difficult, as the washing yield is rather low. Hence, appropriate technical solutions have to be found with a view to optimize cost of washing and yields. Economics of washing can be improved by utilizing rejects for producing electricity in Fluidized Bed Combustion (FBC) boilers. Many private washeries are setting up small capacity FBC units based on washery rejects. At present out of a total coal consumption of about 323 million tones, washed coal accounts for a mere 33 million tones. With the allocation of coal blocks to private and Govt. power utilities for coal mining, washing is set to increase rapidly. The large size supercritical units are slated to use washed /imported coal. 4.3 GENERATION FROM RENEWABLE ENERGY SOURCES IN INDIA Use of Renewable Energy Sources is a far better option than Conventional Energy Sources as they are sustainable and cause comparatively very little pollution. However at a particular instant their quantity is limited and these are not capable of meeting the demand of the Utility. Also these normally provide non despatchable energy, dependent on the vagaries of nature and thus can not be relied upon to meet the peak demand of the system. They generally run at an overall PLF of 15% to 20% (PLF based on total capacity and sum of energy from all the renewable sources). In addition, the power producing technologies are expensive thereby increasing the tariff of power produced. However due to their inherent merits, development of these power sources are being encouraged and power thus generated is being fed into the Grid. Therefore, renewable energy sources have been considered while drawing up the capacity addition programme for the 12th and 13th Plans. Energy from these sources, whenever available, has been considered foremost to meet the demand. Additional capacity from conventional sources has been assessed to meet the balance load of the system. 4.3.1 Potential of Renewables Thrust is being accorded to development of Renewable Energy Sources which are not only a renewable source but are also environmentally benign. The Ministry of Non-conventional Energy Sources has projected the potential for Wind energy itself to be of the order of 45,000 MW. Other forms of non-conventional energy sources are bio-mass, small, mini and micro hydro (using canal falls as cost of civil works is minimal), tidal power and solar energy. These may also be viable as distributed generation to meet the demands of remote locations where extension of grid may be difficult or very costly. In the short term these sources could be exploited for bridging the demand-supply gap especially in geographically dispersed areas. Today the capital cost of non-conventional energy is higher than that of conventional sources on per kW basis except Wind Power. However, their viability could be established if financial cost benefit analysis is replaced by economic cost benefit analysis. As per the information furnished by MNRE, the total estimated medium-term potential (2032) for power generation from renewable energy sources such as wind, small hydro, solar, waste to energy and biomass in the country is about 1,83,000 MW as given in Table 4.9 below:¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 349 Table 4.9 (Figures in MW) Sources / Systems Estimated Mid-Term (2032) Potential Wind Power 45,000 Bio-Power (Agro residues & Plantations) 61,000 Co-generation Baggasse 5,000 Small Hydro (up to 25 MW) 15,000 Waste to Energy 7,000 Solar Photovoltaic 50,000* TOTAL 1,83,000 *As per Objective of the National Solar Mission,1,00,000 MW shall be the Installed Solar generation capacity by 2030 and 2,00,000 MW by 2050.. 4.3.2 Development of Renewable Energy Sources Renewable Energy has been appropriately given the central place in India’s National Action Plan on Climate Change. Intergovernmental Panel on Climate Change(IPCC) in its Fourth Assessment Report on ‘Mitigation of Climate Change’ has observed that technologies are available for mitigating the climate change, however these require appropriate Policy and financial support. Due to its vast market potential for renewable energy projects, and a relatively well- developed industrial, financing and business infrastructure, India is perceived as an excellent country for Clean Development Mechanism (CDM) projects. National renewable energy plans offer ample opportunity for CDM projects and technological innovations. CDM and the emerging carbon market in general have potential to contribute to the financial viability of renewable energy projects, although not necessarily making them fully viable. The Electricity Act 2003 also recognises the role of renewable energy technologies for supplying power to the Utility grid as well as in Stand-alone systems. It empowers the State Electricity Regulatory Commissions (SERCs) to promote renewable energy and specify, for purchase of electricity from renewable sources a percentage of the total consumption of electricity in the area of a distribution licensee. National Electricity Policy also states that non-conventional energy sources have to be exploited fully and promotional measures have to be taken for development of technologies and sustainable development of these sources by SERCs. The tariff policy also mandates minimum percentage of energy from renewable sources to be made applicable for the tariffs to be determined by SERCs. Thus the Electricity Act, National Electricity Policy and the Tariff Policy of Government of India mandate development of renewable resources through a system of obligation of a distribution company to purchase electricity from such sources. These Initiatives provide a major boost for promotion of the renewable energy sector in India. The total Installed capacity from renewable energy sources at the end of 11th Plan i.e. as on 31.03.2012 24,914 MW. India ranks fifth in the world in terms of installed capacity of wind turbine power plants. The capacity addition target for 11th Plan from renewable sources is 14,000 MW (not including solar capacity as proposed under the Solar Mission). Against the target of 14,000 MW during 11th plan a capacity of about 17,000 MW added. During the 12th and 13th Plans, capacity addition is expected to be more than the 11th Plan capacity addition from renewable sources. A number of Incentives have been given by MNRE for setting up of Solar and Wind based power plants. During the 12th and 13th Plans, the capacity addition from renewables is expected to be about 29,500 MW and 30,500 MW respectively. Considering 7,761 MW from renewables at the beginning of 11th Plan i.e. 31.03.2007, the capacity from renewables at the end of 11th, 12th and 13th Plans is expected to be 24,914 MW, 54,414 MW and 84,914 MW. The growth in renewable capacity addition during 10th Plan onwards is illustrated in Exhibit below:350 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 90000 80000 70000 60000 50000 40000 85414 30000 54914 20000 10000 24914 7761 0 1-4-2007 (Beg. of 31-3-2012 (End 31-3-2017 (End 31-3-2022 (End 11th Plan) of 11th plan) of 12th Plan) of 13th Plan) As per MNRE’s perspective Plan, a capacity addition of 60,000 MW is envisaged during the 12th and 13th Plan periods. These estimates include likely capacity addition through Grid –interactive Solar Power. The National Action Plan on Climate Change has identified large-scale Solar Power generation as one of the thrust areas under proposed Solar Mission, An indicative target of 20,000 MW Solar Power by 2020 is envisaged in this Plan. 4.4 DEVELOPMENT OF SOLAR POWER 4.4.1 Introduction Out of all the Non-conventional resources of power generation, Solar energy is the most readily available and abundant source of energy. India being a tropical country with abundant sunshine, solar energy could be easily harnessed for power generation. It is especially advantageous while considering power options for rural electrification, both as grid- connected power and distributed power option. A National Solar Mission has been launched under the National Action Plan for Climate Change (NAPCC) to significantly increase the share of solar energy in the total energy mix while recognizing the need to expand the scope of other renewable and non-fossil options such as nuclear & wind energy and biomass. The ingress of solar technology for energy use has been slow due to a number of factors predominantly the high capital cost and large land requirement for solar installations. A further constraint has been its availability only during the day for energy use, thereby requiring additional high cost for storage system. For any technology to play an effective role and to bring down the costs, it is necessary to take up capacity building in “Mission mode”. Accordingly all efforts are being made to harness Solar energy in the most effective manner, with an eye on sustainability in the near future. MNRE has launched a new scheme in March 2008 for installation of Megawatt Capacity Grid Interactive Solar Power Plants. Under this project, the Ministry will provide a generation based incentive of a maximum of Rs.12 per KWh for the electricity generated from Solar Photovoltaic and the maximum of Rs.10 per KWh for the electricity generated through Solar Thermal Power Plants and fed to the grid from a grid interactive solar power plant of a capacity of 1 MWp and above. This incentive will be provided to the project developers at a fix rate for a period of ten years and will be worked out taking into account the tariff provided by the utility to the solar power producer. This programme will be limited to an aggregate installed capacity of 50 MWp of Solar Power during the 11th Plan period with each State being allowed to set up upto 10 MWp aggregate capacity. )WM( Likely Installed capacity from Renewables 30,500 30,000 17,153¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 351 4.4.2 Potential in India for solar energy India gets plenty of sunlight due to its proximity to the equator. About 5,000 trillion kWh energy is incident over India’s land area with most parts receiving 4 – 7 kWh per sq. m per day. As a thumb rule, 1 MW of solar capacity without storage facility produces 1.6 MU of electricity per annum. In India potential of solar energy is available in the States which are rich in Sunshine, particularly in the States of Rajasthan, Gujarat, Andhra Pradesh, Tamil Nadu and Ladakh. A mapping of the solar potential is available which could be utilized for while setting up Solar installations. 4.4.3 Power from solar energy- Technology Options Solar power entails producing power from the energy of the sun. Sunlight can be converted into electricity predominantly by using 2 types of technologies i.e. Photovoltaic (PV) cell and Solar Thermal or Concentrating Solar Power (CSP) technology as follows: (i) Solar Photovoltaic Panels (ii) Solar Thermal (CSP and heating), which includes Parabolic Trough, Power Towers Dish Design and Fresnel Reflector. Each technology has its own merit and demerit and a judicious choice needs to be made depending upon the requirement and inputs available. 4.4.4 Solar Photo-voltaic (PV) Technology A solar cell or photovoltaic cell is a device that converts sunlight directly into electricity by the photovoltaic effect. Assemblies of cells are used to make solar panels, solar modules, or photovoltaic arrays. Solar cells are often electrically connected and encapsulated as a module. PV modules often have a sheet of glass on the front (sun up) side, allowing light to pass while protecting the semiconductor wafers from the elements (rain, hail, etc.). Solar cells are also usually connected in series in modules, creating an additive voltage. Connecting cells in parallel will yield a higher current. Modules are then interconnected, in series or parallel, or both, to create an array with the desired peak DC voltage and current. To make practical use of the solar-generated energy, the electricity is most often fed into the electricity grid using inverters (grid-connected PV systems); in stand alone systems, batteries are used to store the energy that is not needed immediately. PV has mainly been used to power small and medium-sized applications, from the calculator powered by a single solar cell to off-grid homes powered by a photovoltaic array. For large-scale generation, CSP plants have been the norm. However recently multi-megawatt PV plants are becoming common. Newer alternatives to standard crystalline silicon modules include casting wafers instead of sawing, thin film (CdTe, CIGS, amorphous Si, microcrystalline Si), concentrator modules, 'Sliver' cells, and continuous printing processes. Due to economies of scale solar panels get less costly as people use and buy more — as manufacturers increase production to meet demand, the cost and price is expected to drop in the years to come. 4.4.5 Solar Thermal Technology In this technology, the solar energy is converted into thermal energy, which can then be converted to electrical energy by turbine. The Salient Features of Comparison of the 3 thermal technologies i.e. Parabolic Trough, Power Tower and Dish/Engine are as follows: (cid:1) Towers and troughs are best suited for large, grid connected power projects in the 30-200 MW size wheras dish/engine systems are modular and can be used in single dish applications or grouped in dish farms to create large multi- megawatt projects.352 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] (cid:1) Parabolic troughs are the most mature solar power technology available today and the technology most likely to be used for near term deployment. Proven technology waiting for an opportunity to be developed. (cid:1) Power towers, with low cost and efficient thermal storage promise to offer despatchable, high capacity factor, solar only power plants in the near future. However they require the operability and maintainability of the molten-salt technology to be demonstrated and the development of low cost heliostats (cid:1) The modular nature of dishes allows them to be used in smaller, high value applications. However the dish/engine systems require the development of at least one commercial engine and the development of a low cost concentrator (cid:1) Towers and dishes offer the opportunity to achieve higher solar-to electric efficiencies and lower cost as compared to the trough type but uncertainty remains as to whether these technologies can achieve the necessary capital cost reduction and availability improvements 4.4.6 Objectives and Targets For Solar Power in India As per JNNSM, the objective of the National Solar Mission is to establish India as a global leader in solar energy, by creating the policy conditions for its diffusion across the country as quickly as possible. The Mission will adopt a 3-phase approach, spanning the remaining period of the 11th Plan and first year of the 12th Plan (up to 2012-13) as Phase 1, the remaining 4 years of the 12th Plan (2013-17) as Phase 2 and the 13th Plan (2017- 22) as Phase 3. At the end of each plan, and mid-term during the 12th and 13th Plans, there will be an evaluation of progress, review of capacity and targets for subsequent phases, based on emerging cost and technology trends, both domestic and global. The aim would be to protect Government from subsidy exposure in case expected cost reduction does not materialize or is more rapid than expected. The immediate aim of the Mission is to focus on setting up an enabling environment for solar technology penetration in the country both at a centralized and decentralized level. The first phase (up to 2013) will focus on capturing of the low-hanging options in solar thermal; on promoting off-grid systems to serve populations without access to commercial energy and modest capacity addition in grid-based systems. In the second phase, after taking into account the experience of the initial years, capacity will be aggressively ramped up to create conditions for up scaled and competitive solar energy penetration in the country. To achieve this, the Mission targets are: • To create an enabling policy framework for the deployment of 20,000 MW of solar power by 2022. • To ramp up capacity of grid-connected solar power generation to 1000 MW within three years – by 2013; an additional 3000 MW by 2017 through the mandatory use of the renewable purchase obligation by utilities backed with a preferential tariff. This capacity can be more than doubled – reaching 10,000MW installed power by 2017 or more, based on the enhanced and enabled international finance and technology transfer. The ambitious target for 2022 of 20,000 MW or more, will be dependent on the ‘learning’ of the first two phases, which if successful, could lead to conditions of grid-competitive solar power. The transition could be appropriately up scaled, based on availability of international finance and technology. • To create favourable conditions for solar manufacturing capability, particularly solar thermal for indigenous production and market leadership. • To promote programmes for off grid applications, reaching 1000 MW by 2017 and 2000 MW by 2022. • To achieve 15 million sq. meters solar thermal collector area by 2017 and 20 million by 2022. • To deploy 20 million solar lighting systems for rural areas by 2022.¹Hkkx IIIµ[k.M 4º 25000 20000 15000 10000 5000 0 31 4.4.7 Mission strategy (phase 1 and 2) The first phase will announce the broad policy frame work to achieve the objectives of the National Solar Mission by 2022. The policy announcement will create the necessary environment to attract industry and project developers to invest in research, domestic manufacturing and development of solar power generation and thus create the critical mass for a domestic solar industry. The Mission will work closely with State Governments, Regulators, Power utilities and Local Self Government bodies to ensure that t effectively. Since some State Governments have already announced initiatives on solar, the Mission will draw up a suitable transition framework to enable an early and aggressive start A. Utility connected applications: constructing the solar grid The key driver for promoting solar power would be through a Renewable Purchase Obligation (RPO) mandated for power utilities, with a specific solar component. This will drive utility scale solar thermal. The Solar Purchase Obligation will be gradually increased while the tariff fixed for Solar power purchase will decline over time. B. The below 80°C challenge – solar collectors The Mission in its first two phases will promote solar heating systems, which are already using proven technology and are commercially viable. The Mission is setting an ambitious target for ensuring that applications, domestic and industrial, below 80 °C are solarised. The key strategy of the Mission will be to make necessary policy changes to meet this objective: • Firstly, make solar heaters mandatory, through building byelaws and incorporation in the National Building Code, • Secondly, ensure the introduction of effective mechanisms for certification and rating of manufacturers of solar thermal applications, • Thirdly, facilitate measurement and promotion of these individual devices through local agencies and power utilities, and • Fourthly, support the upgrading of technologies and manufacturing capacities through soft loans, to achieve higher efficiencies and further cost reduction. C. The off-grid opportunity - lighting homes of the power A key opportunity for solar power lies in decentralized and off grid penetration is neither feasible nor cost effective, solar energy applications are cost people with no access, currently, to light and power, WM Hkkjr dk jkti=k % vlk/kj.k 353 PPLLAANNNNEEDD IINNSSTTAALLLLEEDD CCAAPPAACCIITTYY FFRROOMM SSOOLLAARR 20,000 10,000 1000 31-3-2013 31-3-2017 31-3-22002222 Mission strategy (phase 1 and 2) TThhee ffiirrsstt pphhaassee wwiillll aannnnoouunnccee tthhee bbrrooaadd ppoolliiccyy ffrraammee wwoorrkk ttoo aacchhiieevvee tthhee oobbjjeeccttiivveess ooff tthhee NNaattiioonnaall SSoollaarr MMiissssiioonn bbyy 22002222.. TThhee ppoolliiccyy aannnnoouunncceemmeenntt wwiillll ccrreeaattee tthhee nneecceessssaarryy eennvviirroonnmmeenntt ttoo aattttrraacctt iinndduussttrryy aanndd pprroojjeecctt ddeevveellooppeerrss ttoo ttiicc mmaannuuffaaccttuurriinngg aanndd ddeevveellooppmmeenntt ooff ssoollaarr ppoowweerr ggeenneerraattiioonn aanndd tthhuuss ccrreeaattee tthhee ccrriittiiccaall mmaassss ffoorr aa ddoommeessttiicc ssoollaarr iinndduussttrryy.. TThhee MMiissssiioonn wwiillll wwoorrkk cclloosseellyy wwiitthh SSttaattee GGoovveerrnnmmeennttss,, RReegguullaattoorrss,, PPoowweerr uuttiilliittiieess aanndd Local Self Government bodies to ensure that thhee aaccttiivviittiieess aanndd ppoolliiccyy ffrraammeewwoorrkk bbeeiinngg llaaiidd oouutt ccaann bbee iimmpplleemmeenntteedd eeffffeeccttiivveellyy.. SSiinnccee ssoommee SSttaattee GGoovveerrnnmmeennttss hhaavvee aallrreeaaddyy aannnnoouunncceedd iinniittiiaattiivveess oonn ssoollaarr,, tthhee MMiissssiioonn wwiillll ddrraaww uupp aa suitable transition framework to enable an early and aggressive start-up. A. Utility connected applications: constructing the solar grid TThhee kkeeyy ddrriivveerr ffoorr pprroommoottiinngg ssoollaarr ppoowweerr wwoouulldd bbee tthhrroouugghh aa RReenneewwaabbllee PPuurrcchhaassee OObblliiggaattiioonn ((RRPPOO)) mmaannddaatteedd ffoorr power utilities, with a specific solar component. This will drive utility scale ppoowweerr ggeenneerraattiioonn,, wwhheetthheerr ssoollaarr PPVV oorr ssoollaarr tthheerrmmaall.. TThhee SSoollaarr PPuurrcchhaassee OObblliiggaattiioonn wwiillll bbee ggrraadduuaallllyy iinnccrreeaasseedd wwhhiillee tthhee ttaarriiffff ffiixxeedd ffoorr SSoollaarr ppoowweerr ppuurrcchhaassee solar collectors TThhee MMiissssiioonn iinn iittss ffiirrsstt ttwwoo pphhaasseess wwiillll pprroommoottee ssoollaarr hheeaattiinngg ssyysstteemmss,, wwhhiicchh aarree aallrreeaaddyy uussiinngg pprroovveenn tteecchhnnoollooggyy aanndd aarree ccoommmmeerrcciiaallllyy vviiaabbllee.. TThhee MMiissssiioonn iiss sseettttiinngg aann aammbbiittiioouuss ttaarrggeett ffoorr eennssuurriinngg tthhaatt aapppplliiccaattiioonnss,, ddoommeessttiicc aanndd rree ssoollaarriisseedd.. TThhee kkeeyy ssttrraatteeggyy ooff tthhee MMiissssiioonn wwiillll bbee ttoo mmaakkee nneecceessssaarryy ppoolliiccyy cchhaannggeess ttoo mmeeeett FFiirrssttllyy,, mmaakkee ssoollaarr hheeaatteerrss mmaannddaattoorryy,, tthhrroouugghh bbuuiillddiinngg bbyyeellaawwss aanndd iinnccoorrppoorraattiioonn iinn tthhee NNaattiioonnaall BBuuiillddiinngg CCooddee,, ttrroodduuccttiioonn ooff eeffffeeccttiivvee mmeecchhaanniissmmss ffoorr cceerrttiiffiiccaattiioonn aanndd rraattiinngg ooff mmaannuuffaaccttuurreerrss ooff ssoollaarr TThhiirrddllyy,, ffaacciilliittaattee mmeeaassuurreemmeenntt aanndd pprroommoottiioonn ooff tthheessee iinnddiivviidduuaall ddeevviicceess tthhrroouugghh llooccaall aaggeenncciieess aanndd ppoowweerr oorrtt tthhee uuppggrraaddiinngg ooff tteecchhnnoollooggiieess aanndd mmaannuuffaaccttuurriinngg ccaappaacciittiieess tthhrroouugghh ssoofftt llooaannss,, ttoo aacchhiieevvee higher efficiencies and further cost reduction. lighting homes of the power- deprived poor: s in decentralized and off-ggrriidd aapppplliiccaattiioonnss.. IInn rreemmoottee aanndd ffaarr-flung areas where grid penetration is neither feasible nor cost effective, solar energy applications are cost-eeffffeeccttiivvee.. TThheeyy eennssuurree tthhaatt people with no access, currently, to light and power, move directly to solar, leap-ffrrooggggiinngg tthhee ffoossssiill ffuueell ttrraajjeeccttoorryy ooff354 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] growth. The key problem is to find the optimum financial strategy to pay for the high-end initial costs in these applications through appropriate Government support. Currently, market based and even micro-credit based schemes have achieved only limited penetration in this segment. The Government has promoted the use of decentralized applications through financial incentives and promotional schemes. While the Solar Mission has set a target of 1000 MW by 2017, which may appear small, but its reach will add up to bringing changes in millions of households. The strategy will be learn from and innovate on existing schemes to improve effectiveness. The Mission plans to: • Provide solar lighting systems under the ongoing remote village electrification programme of MNRE to cover about 10,000 villages and hamlets. The use of solar lights for lighting purposes would be promoted in settlements without access to grid electricity and since most of these settlements are remote tribal settlements, 90% subsidy is provided. The subsidy and the demand so generated would be leveraged to achieve indigenization as well as lowering of prices through the scale effect. For other villages which are connected to grid , solar lights would be promoted through market mode by enabling banks to offer low cost credit. • Set up stand alone rural solar power plants in special category States and remote and difficult areas such as Lakshadweep, Andaman & Nicobar Islands, Ladakh region of J&K. Border areas would also be included. Promotion of other off grid solar applications would also be encouraged. This would include hybrid systems to meet power, heating and cooling energy requirements currently being met by use of diesel and other fossil fuels. These devices would still require interventions to bring down costs but the key challenge would be to provide an enabling framework and support for entrepreneurs to develop markets. Solar energy to power computers to assist learning in schools and hostels, Management Information System (MIS) to assist better management of forests in MP, powering milk chilling plants in Gujarat, empowering women Self Help Groups (SHGs) involved in tussar reeling in Jharkhand, cold chain management for Primary Health Centres (PHCs) are some examples of new areas, being tried successfully in the country. The Mission would consider up to 30 per cent capital subsidy (which would progressively decline over time) for promoting such innovative applications of solar energy and would structure a non-distorting framework to support entrepreneurship, up-scaling and innovation. In order to create a sustained interest within the banking community, it is proposed to provide a soft re-finance facility through Indian Renewable Energy Development Agency (IREDA) for which Government will provide budgetary support. IREDA would in turn provide refinance to NBFCs & banks with the condition that it is on-lend to the consumer at rates of interest not more than 5 per cent. The Mission would provide an annual tranche for the purpose which would be used for refinance operations for a period of ten years at the end of which the funds shall stand transferred to IREDA as capital and revenue grants for on-lending to future renewable energy projects. D. Manufacturing capabilities: innovate, expand and disseminate Currently, the bulk of India’s Solar PV industry is dependent on imports of critical raw materials and components – including silicon wafers. Transforming India into a solar energy hub would include a leadership role in low-cost, high quality solar manufacturing, including balance of system components. Proactive implementation of Special Incentive Package (SIPs) policy, to promote PV manufacturing plants, including domestic manufacture of silicon material, would be necessary. Indigenous manufacturing of low temperature solar collectors is already available; however, manufacturing capacities for advanced solar collectors for low temperature and concentrating solar collectors and their components for medium and high temperature applications need to be built. An incentive package, similar to SIPS, could be considered for setting up manufacturing plants for solar thermal systems/ devices and components. The SME sector forms the backbone for manufacture of various components and systems for solar systems. It would be supported through soft loans for expansion of facilities, technology up gradation and working capital. IREDA would provide this support through refinance operations. It should be ensured that transfer of technology is built into Government and private procurement from foreign sources.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 355 E. R&D for Solar India: creating conditions for research and application A major R&D initiative to focus: firstly, on improvement of efficiencies in existing materials, devices and applications and on reducing costs of balance of systems, establishing new applications by addressing issues related to integration and optimization; secondly, on developing cost-effective storage technologies which would address both variability and storage constraints, and on targeting space-intensity through the use of better concentrators, application of nano- technology and use of better and improved materials. The Mission will be technology neutral, allowing technological innovation and market conditions to determine technology winners. A Solar Research Council will be set up to oversee the strategy, taking into account ongoing projects, availability of research capabilities and resources and possibilities of international collaboration. An ambitious human resource development programme, across the skill-chain, will be established to support an expanding and large-scale solar energy programme, both for applied and R&D sectors. In Phase I, at least 1000 young scientists and engineers would be incentivized to get trained on different solar energy technologies as a part of the Mission’s long-term R&D and HRD plan. Pilot demonstration projects would be closely aligned with the Mission’s R & D priorities and designed to promote technology development and cost reduction. The Mission, therefore, envisages the setting up of the following demonstration projects in Phase I, in addition to those already initiated by MNRE and those, which may be set up by corporate investors: 1. 50-100 MW Solar thermal plant with 4-6 hours’ storage (which can meet both morning and evening peak loads and double plant load factor up to 40%). 2. A 100-MW capacity parabolic trough technology based solar thermal plant. 3. A 100-150 MW Solar hybrid plant with coal, gas or bio-mass to address variability and space-constraints. 4. 20-50 MW solar plants with/without storage, based on central receiver technology with molten salt/steam as the working fluid and other emerging technologies. 5. Grid-connected rooftops PV systems on selected government buildings and installations, with net metering. 6. Solar-based space-cooling and refrigeration systems to meet daytime and summer season peak load. These could be installed on selected government buildings and installations. The configurations and capacities as mentioned above are indicative and would be firmed up after consultations with various stakeholders. Bidding process will be adopted to set up solar power demonstration plants which would help in better price discovery for determining tariff for solar power. It will be ensured that indigenous content is maximized. The bid documents will also include a technology transfer clause. It is expected that these plants will be commissioned in the 12th plan period. 4.4.8 Proposed Roadmap The aspiration is to ensure large-scale deployment of solar generated power for grid-connected as well as distributed and decentralized off-grid provision of commercial energy services. The deployment across the application segments is envisaged as in Table 4.9 below: Table 4.9 S. Application segment Target for Phase I Target for Phase 2 Target for Phase 3 No. (2010-13) (2013-17) (2017-22) 1. Solar collectors 7 million sq meters 15 million sq meters 20 million sq meters 2. Off grid solar applications 200 MW 1000 MW 2000 MW 3. Utility grid power, including 1,000-2000 MW 4000-10,000 MW 20000 MW roof top356 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 4.4.9. Policy and regulatory framework The objective of the Mission is to create a policy and regulatory environment which provides a predictable incentive structure that enables rapid and large-scale capital investment in solar energy applications and encourages technical innovation and lowering of costs. Although in the long run, the Mission would seek to establish a sector-specific legal and regulatory framework for the development of solar power, in the shorter time frame, it would be necessary to embed the activities of the Mission within the existing framework of the Electricity Act 2003. The Electricity Act already provides a role for renewables but given the magnitude and importance of the activities under the Mission, it would be necessary to make specific amendments. The National Tariff Policy 2006 mandates the State Electricity Regulatory Commissions (SERC) to fix a minimum percentage of energy purchase from renewable sources of energy taking into account availability of such resources in the region and its impact on retail tariff. National Tariff Policy, 2006 would be modified to mandate that the State electricity regulators fix a percentage for purchase of solar power. The solar power purchase obligation for States may start with 0.25% in the phase I and to go up to 3% by 2022. This could be complemented with a solar specific Renewable Energy Certificate (REC) mechanism to allow utilities and solar power generation companies to buy and sell certificates to meet their solar power purchase obligations. The Central Electricity Regulatory Commission has recently issued guidelines for fixing feed-in-tariff for purchase of Solar power taking into account current cost and technology trends. These will be revised on an annual basis. The CERC has also stipulated that Power Purchase Agreement that utilities will conclude with Solar power promoters, should be for a period of 25 years. In order to enable the early launch of “Solar India” and encourage rapid scale up, a scheme is being introduced in cooperation with the Ministry of Power, the NTPC and the Central Electricity Authority, which would simplify the off- take of solar power and minimize the financial burden on Government. Many investors are willing to set up solar based power plants. However, sale of power by the IPPs may be an issue due to the high cost of power and realization of tariff for the same from the distribution companies. In order to incentivise setting up of a large number of Solar Power Projects, while minimizing the impact on tariff various alternatives were explored. One of the options is to bundle solar power along with power out of the cheaper unallocated quota of Central stations and selling this bundled power to state distribution utilities at the CERC regulated price. This will bring down the gap between average cost of power and sale price of power. For the purpose of bundling, power has to be purchased by an entity and re-sold to the state power distribution utilities. Such function can be done only by a trading company/ Discoms, as per the existing statutory provisions. NTPC has a wholly owned subsidiary company engaged in the business of trading of power – NTPC Vidyut Vyapar Nigam Ltd. (NVVN). NVVN will be designated as nodal agency by the Ministry of Power (MoP) for entering into a Power Purchase Agreement (PPA) with Solar Power Developers. The PPAs shall be signed with the developers who will be setting up Solar Projects and are connected to the grid at 33 KV level and above. The PPAs will be valid for a period of 25 years. For each MW of solar power installed capacity for which PPA is signed by NVVN, MOP shall allocate to NVVN an equivalent amount of MW capacity from the unallocated quota of NTPC stations. NVVN will bundle this power and sell this bundled power at a rate fixed as per CERC regulations. In case of significant price movement in the market rate, the Government will review the situation. When NVVN supplies the bundled power to distribution utilities, those distribution utilities will be entitled to use part of the bundled power to meet their RPO, as determined by the regulatory authorities. The CERC may issue appropriate guidelines in this regard. At the end of the first phase, well-performing utilities with proven financial credentials and demonstrated willingness to absorb solar power shall be included in the Scheme, in case it is decided to extend it into Phase II.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 357 The requirement of phased indigenization would be specified while seeking development of solar power projects under this scheme. The size of each project would be determined so as to make phased indigenization feasible. The tariff and tax regime for key components and segments would be suitably fine tuned so as to promote the process of indigenization. The Mission will encourage rooftop solar PV and other small solar power plants, connected to LT/11 KV grid, to replace conventional power and diesel-based generators. Operators of solar PV rooftop devices will also be eligible to receive the feed-in tariff fixed by the CERC, both on the solar power consumed by the operator and the solar power fed into the grid. Utilities will debit/credit the operator for the net saving on conventional power consumed and the solar power fed into the grid, as applicable. A Generation Based Incentive will be payable to the utility to cover the difference between the solar tariff determined by CERC, less the base price of Rs. 5.50/kWh with 3% p.a. escalation. The metering and billing arrangements between the utility and the rooftop PV operator will be as per guidelines/regulations of the appropriate commission. State Governments would also be encouraged to promote and establish solar generation Parks with dedicated infrastructure for setting up utility scale plants to ensure ease of capacity creation. FISCAL INCENTIVES It is also recommended that custom duties and excise duties concessions/ exemptions be made available on specific capital equipment, critical materials, components and project imports. 4.4.10 Solar Manufacturing in India One of the Mission objectives is to take a global leadership role in solar manufacturing (across the value chain) of leading edge solar technologies and target a 4-5 GW equivalent of installed capacity by 2020, including setting up of dedicated manufacturing capacities for poly silicon material to annually make about 2 GW capacity of solar cells. India already has PV module manufacturing capacity of about 700 MW, which is expected to increase in the next few years. The present indigenous capacity to manufacture silicon material is very low; however, some plants are likely to be set up soon in public and private sector. Currently, there is no indigenous capacity/capability for solar thermal power projects; therefore new facilities will be required to manufacture concentrator collectors, receivers and other components to meet the demand for solar thermal power plants. To achieve the installed capacity target, the Mission recommends the following: • Local demand creation: The 20 GW plan supported with right level of incentives for solar generation coupled with large government pilot/demonstration programs will make the Indian market attractive for solar manufacturers • Financing & Incentives: SEZ like incentives to be provided to the manufacturing parks which may include: (cid:2) Zero import duty on capital equipment, raw materials and excise duty exemption (cid:2) Low interest rate loans, priority sector lending (cid:2) Incentives under Special Incentive Package (SIPs) policy to set up integrated manufacturing plants; (i) from poly silicon material to solar modules; and (ii) thin film based module manufacturing plants. . Under the SIP scheme of the Department of Information Technology, there are 15 applications in the domain of solar photovoltaic, which includes cell manufacturing, (both crystalline and thin film) and poly-silicon manufacturing among others. The combined capacity projected by these 15 companies could result in the production of 8-10 GW solar power by the year 2022 which would be sufficient for meeting the Mission targets even after accounting for exports. (cid:2) It is also recommended that solar components be covered under the Bureau of Energy Efficiency’s star rating programme to ensure high standards. Similar incentives will be required for manufacture of CSP systems and their components. A Committee may be set up to formulate a policy for promotion of solar thermal manufacture in the country. • Ease of doing business: In consultation with States, create a single window clearance mechanism for all related permissions.358 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] • Infrastructure & ecosystem enablers: Create 2-3 large solar manufacturing tech parks consisting of manufacturing units (across the solar value chain), housing, offices, and research institutes. These will have 24x7 power and water supply and will likely need to be located near large urban centres with good linkages to ports and airports to ensure rapid access to imported raw materials and high quality engineering talent. 4.4.11 Research and Development This Mission will launch a major R&D programme in Solar Energy, which will focus on improving efficiency in existing applications, reducing costs of Balance of Systems, testing hybrid co-generation and addressing constraints of variability, space-intensity and lack of convenient and cost-effective storage. The R&D strategy would comprise dealing with five categories viz. i) Basic research having long term perspective for the development of innovative and new materials, processes and applications, ii) Applied research aimed at improvement of the existing processes, materials and the technology for enhanced performance, durability and cost competitiveness of the systems/ devices, iii) Technology validation and demonstration projects aimed at field evaluation of different configurations including hybrids with conventional power systems for obtaining feedback on the performance, operability and costs, iv) development of R&D infrastructure in PPP mode, and v) support for incubation and start ups. To support the R&D Strategy, the Mission may include the following: - Setting up a high level Research Council comprising eminent scientists, technical experts and representatives from academic and research institutions, industry, Government and Civil Society to guide the overall technology development strategy. The Council may invite eminent international experts in the field to support its work. The Council will review and update the technology roadmap to achieve more rapid technological innovation and cost reduction. - A National Centre of Excellence (NCE) shall be established to implement the technology development plan formulated by the Research Council and serve as its Secretariat. It will coordinate the work of various R&D centres, validate research outcomes and serve as an apex centre for testing and certification and for developing standards and specifications for the Solar industry. It is envisaged that the Solar Energy Centre of the MNRE will become part of the National Centre of Excellence. - The Research Council, in coordination with the National Centre of Excellence, inventorize existing institutional capabilities for Solar R&D and encourage the setting up of a network of Centres of Excellence, each focusing on an R&D area of its proven competence and capability. These Centres may be located in research institutes, academic institutions or even private sector companies. They will be encouraged to bid for various components of the Solar Technology Development Plan, and may do so adopting a consortium approach, collaborating with other institutions, including foreign collaboration, with proven capabilities. - The NCE will provide a national platform for networking among different centers of excellence and research institutions, including foreign R&D institutions and high-tech companies. - The NCE will serve as the funding agency to support performance-linked solar R&D programmes. This will include funding, or co-funding of pilot demonstration projects in areas relevant to Mission objectives. Funding will need to be adequate, predictable and should typically cover a time frame extending from 5-10 years. - The NCE will be the main interface with international research institutions, research groups from foreign countries, high-tech start-up companies and multilateral programmes (such as those which may emerge from current negotiations under the UNFCCC). It will encourage joint projects between international partners and Indian centres of excellence, with sharing of IPR, as also encourage the setting up of R&D bases in India by advanced high-tech companies from abroad. - The NCE will coordinate with the IMD, ISRO and other concerned agencies, the detailed mapping of ground irradiance or insulation, particularly in high potential solar regions of the country. Accurate and reliable data is a critical requirement for all solar applications, in particular, concentrated solar power (CSP).¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 359 - In drawing up the Solar Technology Development Plan, the Research Council will review ongoing and proposed R&D initiatives of MNRE, the Department of Science and Technology, the Ministry of Earth Sciences and other agencies and institutions and incorporate them, as appropriate, in its Plan. In order to provide support for incubation and start ups, the Mission could tie up with institutions like Centre for Innovation, Incubation and Entrepreneurship (CIIE) based in IIM Ahmedabad to incubate solar energy start-ups and SMEs in India through mentoring, networking and financial support. A fund could be established to aim at supporting at least 50 start-ups developing and deploying solar related technologies across India over the next 5 years and would be managed by a professional entity. The Fund shall be structured as a Venture Fund and would be operated as a hub and spoke model with the professional entity coordinating the fund activities and also identifying like minded institutions for administering the fund. The Fund would provide financial (equity/debt) support to start-ups, entrepreneurs and innovators for R&D and pilot of new solar related technologies and for creating new and unique business models which have a potential of increasing the deployment of solar related technologies in India – for all segments including consumer, SME and commercial usage. The initiative shall be structured ideally in a private-public partnership model, to be able to provide risky capital to the aspiring entrepreneurs. It would also attract contributions from private stakeholders, amounting to, at least 10% of that of the Government. The returns generated on the Government support to the Fund shall be ploughed back for further promoting incubation activities in this space. The Mission would also explore the possibility of collaborating with CSIR to launch an Open Source Solar Development initiative on similar lines as the Open Source Drug Discovery platform of CSIR 4.4.12 Institutional Arrangements for implementing the Mission This Mission will be implemented by an autonomous Solar Energy Authority and or an autonomous and enabled Solar Mission, embedded within the existing structure of the Ministry of New and Renewable Energy. The Authority/Mission secretariat will be responsible for monitoring technology developments, review and adjust incentives, manage funding requirements and execute pilot projects. The Mission will report to the Prime Minister’s Council on Climate Change on the status of its programme. The broad contours of an autonomous and enabled Mission would comprise of: i) A Mission Steering Group, chaired by the Minister for New and Renewable Energy and composed of representatives from all relevant Ministries and other stakeholders, will be set up to over see the over all implementation of the National Solar Mission. The Mission Steering Group will be fully empowered to approve various schemes/ projects/ policies and the related financial norms for all schemes covered under the National Solar Mission (NSM). The Mission Steering group will also authorize any modifications/deviations in the norms on ongoing schemes. ii) A Mission Executive Committee, chaired by Secretary, Ministry of New and Renewable Energy, will periodically review the progress of implementation of the projects approved by the Mission Steering Group. iii) An empowered Solar Research Council headed by an eminent scientist will advise the Mission on all R&D, technology and capacity building related matters. In addition, Industry Advisory Council will advise the Mission on all matters relating to industrial development, technology transfer/ absorption/joint ventures, incentives and investment related matters. iv) A Mission Director, with the rank of an Additional Secretary, would head the Mission secretariat and be responsible for day to day functioning and also achieving the goals laid out in a time bound manner. The Mission Secretariat would have Joint secretary/ Scientist G level officers including other scientists, experts and consultants. 4.4.13 Sites and Land for Solar Installation Identifying suitable site and adequate land for setting up of a particular type of Solar installation is our foremost requirement. Solar energy can be utilised in the following ways: i) Solar thermal energy being used as process heat for domestic, commercial and industrial applications360 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ii) Solar power being used in the DDG mode iii) Solar power being fed into the Utilities’ grid system In case of Alternative (i.) and (ii) the site for setting up the solar installation would most likely be the roof-top or land within the premises of the user/group of users. However in case of Alternative (iii) it would be preferable to have the site of installation in the vicinity of the grid system since connectivity of the power generated to be injected into the grid would also be an issue. In case the site is away from the power station or the substation, additional cable/lines would have to be laid to inject this power into the grid. It is therefore considered that solar installations at generation stations or grid substations are the best option. In case this is not feasible, alternate barren land shall have to be identified for this purpose. At present, the Installed Capacity in the country is about 2, 10, 000 MW. A capacity of about 88,000 MW is under execution for commissioning during 12th Plan and a capacity of about 1 lakh MW is expected during 13th Plan. This entire capacity has huge potential to accommodate electricity generated from solar installations in real time without the use of storage devices. 4.4.14 Human Resource Development The rapid and large-scale diffusion of Solar Energy will require a concomitant increase in technically qualified manpower of international standard. Some capacity already exists in the country, though precise numbers need to be established. However, it is envisaged that at the end of Mission period, Solar industry will employ at least 100,000 trained and specialized personnel across the skill spectrum. These will include engineering management and R&D functions. The following steps may be required for Human Resource Development: • IITs and premier Engineering Colleges will be involved to design and develop specialized courses in Solar Energy, with financial assistance from Government. These courses will be at B. Tech, M. Tech and Ph. D level. Some of the IITs, Engineering Colleges and Universities are teaching solar energy at graduation and post graduation level. Centres for Energy studies have been set up by some of the IITs and engineering colleges. These initiatives will be further strengthened. In addition, a countrywide training programme and specialized courses for technicians will be taken up to meet the requirement of skilled manpower for field installations and after sales service network. The Directorate General of Education and Training under the Ministry of Labour has agreed to introduce training modules for course materials for technicians in order to create a skilled workforce which could service and maintain solar applications. MNRE has already initiated this activity with the Ministry of Labour and a short term training module is to be introduced during the current academic session. In addition, industry is also working with some of the ITIs to create a skilled work force. • A Government Fellowship programme to train 100 selected engineers / technologies and scientists in Solar Energy in world class institutions abroad will be taken up. This may need to be sustained at progressively declining levels for 10 years. This could be covered under the ongoing bilateral programmes. Institution to institution arrangements will also be developed. Fellowships will be at two levels (i) research and (ii) higher degree (M. Tech) in solar energy. MNRE is already implementing a fellowship programme in this regard, which will be expanded to include students from a larger number of academic institutions. This may be done in consultation with industry to offer employment opportunities. Setting up of a National Centre for Photovoltaic Research and Education at IIT, Mumbai, drawing upon from Department of Energy Science and Engineering and its Centre for Excellence in Nano-Electronics is considered.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 361 4.4.15 Task Force set up by MNRE A Task Force has been set up by MNRE under the Chairmanship of Chairperson, CEA to examine technical issues related to the feasibility of integrating solar power plants with thermal/ hydro-electric power plants and connectivity of solar rooftops systems with the grid. The Task Force comprises of representatives of MNRE, MOP, CEA, NTPC, NHPC, BHEL, CEL, RRECL, RRUVNL, GSECL, GEDA and KPCL. The objective of the Task Force is to prepare implementable project reports for setting up solar plants at power plants, one each at coal based, gas based and hydro power stations. The project report shall include complete bill of material, cost estimates, methodology of accounting energy and to establish the commercial viability. Three Subgroups have been formed under the Task Force to look into the specific areas of (i) Feasibility of solar generation with respect to space availability, any constraints foreseen and application areas (ii) Solar technology options and techno-economics (iii) Arrangement for connectivity and metering of solar plants. The following reports were prepared by the sub groups and these reports are available on CEA website. • Report of Sub Group-I on Grid Interactive Rooftop Solar PV System – Dec 2009 • Sub Group-I- Technical specification of Grid Interactive Rooftop Solar PV System for Sewa Bhawan – Dec 2009 • Report of the Sub Group-II and III Integration of Solar Systems with Thermal/ Hydro Power stations – January 2010 A feasibility report for installing 5 MW solar plant in Leh was also prepared by Sub Group-I and the report was sent to Secretary (Power), J&K and Secretary, MNRE. 4.4.16 Fund Requirement One of the major bottlenecks in the development of Solar Installations is the high Capital cost which results in high tariff as compared to power generated using Conventional Energy Resources. It has been estimated that the capital cost of solar installations is about Rs 20crs/MW, with Solar thermal being marginally lesser i.e. about Rs 18 crs/MW. However it is expected that the cost will decline as the technology gets established and the quantum of orders increase with time. It is expected that the cost which would be about Rs 20 crs/MW during the 11th Plan, will reduce to Rs 16crs/MW during the 12th Plan and about Rs 12crs/MW during the 13th Plan. First Phase Second Phase Third Phase (2008-13) (2013-17) (2017-22) Installed Capacity (Solar) in MW 1000 10000 20,000 Capacity Addition during Plan in MW 1000 9000 10,000 Funds reqt per MW (Rs crs) 20 16 12 Funds Requirement (Rs crs) 20,000 1,44,000 1,20,000362 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] As per JNNSM, the fund requirements for the Mission would be met from the following sources or combinations: i) Budgetary support for the activities under the National Solar Mission established under the MNRE; ii) International Funds under the UNFCCC framework, which would enable upscaling of Mission targets. The Mission strategy has kept in mind the two-fold objectives, to scale-up deployment of solar energy and to do this keeping in mind the financial constraints and affordability challenge in a country where large numbers of people still have no access to basic power and are poor and unable to pay for high cost solutions. The funding requirements and arrangements for Phase II will be determined after a review of progress achieved at the end of the 11th Plan and an analysis of the efficacy of the model adopted for capacity building of utility scale solar power. Annexure-4.1 LIST OF THERMAL UNITS PROGRAMMED FOR LIFE EXTENSION WORKS DURING 12TH PLAN 1. STATE SECTOR Sl. State Name of Utility Name of Unit Year of Capacity Make LMZ / No. Station No. Comm. (MW) Boiler TG KWU Northern Region 1 U.P. UPRVUNL Obra 10 1977 200 BHEL BHEL LMZ 2 U.P. UPRVUNL Obra 11 1977 200 BHEL BHEL LMZ 3 U.P. UPRVUNL Obra 12 1981 200 BHEL BHEL LMZ 4 U.P. UPRVUNL Obra 13 1982 200 BHEL BHEL LMZ 5 U.P. UPRVUNL Harduaganj 7 1978 110 BHEL BHEL 6 U.P. UPRVUNL Parichha 1 1984 110 BHEL BHEL 7 U.P. UPRVUNL Parichha 2 1985 110 BHEL BHEL Sub Total 7 1130 8 Punjab PSPCL Bathinda 3 1978 110 BHEL BHEL 9 Punjab PSPCL Bathinda 4 1979 110 BHEL BHEL Sub Total 2 220 10 Haryana HPGCL Panipat 3 1985 110 BHEL BHEL 11 Haryana HPGCL Panipat 4 1985 110 BHEL BHEL Sub Total 2 220 Sub Total Northern Region 11 1570 Western Region 12 Maharashtra MAHAGENCO Nashik 3 1979 210 BHEL BHEL LMZ 13 Maharashtra MAHAGENCO Nashik 4 1980 210 BHEL BHEL LMZ 14 Maharashtra MAHAGENCO Koradi 5 1978 210 BHEL BHEL LMZ 15 Maharashtra MAHAGENCO Koradi 6 1982 200 BHEL BHEL LMZ 16 Maharashtra MAHAGENCO Bhusawal 2 1979 210 BHEL BHEL LMZ 17 Maharashtra MAHAGENCO Bhusawal 3 1982 210 BHEL BHEL LMZ 18 Maharashtra MAHAGENCO Chandrapur 1 1983 210 BHEL BHEL LMZ 19 Maharashtra MAHAGENCO Chandrapur 2 1984 210 BHEL BHEL LMZ 20 Maharashtra MAHAGENCO Parli 3 1980 210 BHEL BHEL LMZ Sub Total 9 1880 21 Chattisgarh CSEB Korba (West) 1 1983 210 BHEL BHEL KWU 22 Chattisgarh CSEB Korba (West) 2 1984 210 BHEL BHEL KWU Sub Total 2 420 23 Madhya Pradesh MPPGCL Satpura 6 1979 200 BHEL BHEL LMZ 24 Madhya Pradesh MPPGCL Satpura 7 1979 210 BHEL BHEL LMZ Sub Total 2 410 Sub Total Western Region 17 3530 Southern Region 25 Tamil Nadu TNEB Tuticorin 1 1979 210 BHEL BHEL LMZ 26 Tamil Nadu TNEB Tuticorin 2 1980 210 BHEL BHEL LMZ Sub Total 2 420 27 Andhra Pradesh APGENCO Dr. N.T. TPS 1 1979 210 BHEL BHEL LMZ (Vijaywada) 28 Andhra Pradesh APGENCO Dr. N.T. TPS 2 1980 210 BHEL BHEL LMZ (Vijaywada) Sub Total 2 420 29 Karnataka KPCL Raichur 1 1985 210 BHEL BHEL KWU 30 Karnataka KPCL Raichur 2 1986 210 BHEL BHEL KWU Sub Total 2 420 Sub Total Southern Region 6 1260 31 Bihar BSEB Barauni 6 1983 110 BHEL BHEL 32 Bihar BSEB Barauni 7 1985 110 BHEL BHEL 33 Bihar KBUNL Muzaffarpur 1 1985 110 BHEL BHEL 34 Bihar KBUNL Muzaffarpur 2 1986 110 BHEL BHEL Sub Total 4 440 35 West Bengal WBPDCL Kolaghat 1 1990 210 AVB BHEL LMZ¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 363 Sl. State Name of Utility Name of Unit Year of Capacity Make LMZ / No. Station No. Comm. (MW) Boiler TG KWU 36 West Bengal WBPDCL Kolaghat 2 1985 210 AVB BHEL LMZ 37 West Bengal WBPDCL Kolaghat 3 1984 210 AVB BHEL LMZ 38 West Bengal WBPDCL Bandel 5 1982 210 AVB BHEL LMZ Sub Total 4 840 Sub Total Eastern Region 8 1280 SUB TOTAL STATE SECTOR 38 6820 Sl. No. Name of Utility Name of Station Unit Year of Capacity Make LMZ / KWU No. Comm. (MW) Boiler TG 2. CENTRAL SECTOR 1 DVC Bokaro 'B' 1 1986 210 ABL BHEL LMZ 2 DVC Bokaro 'B' 2 1990 210 ABL BHEL LMZ 3 DVC Bokaro 'B' 3 1993 210 ABL BHEL LMZ 4 DVC Durgapur 4 1982 210 BHEL BHEL LMZ Sub Total 4 840 5 NTPC Badarpur 4 1978 210 BHEL BHEL LMZ 6 NTPC Badarpur 5 1981 210 BHEL BHEL LMZ 7 NTPC Singrauli STPS 1 1982 200 BHEL BHEL LMZ 8 NTPC Singrauli STPS 2 1982 200 BHEL BHEL LMZ 9 NTPC Singrauli STPS 3 1983 200 BHEL BHEL LMZ 10 NTPC Singrauli STPS 4 1983 200 BHEL BHEL LMZ 11 NTPC Singrauli STPS 5 1984 200 BHEL BHEL LMZ 12 NTPC Korba STPS 1 1983 200 BHEL BHEL KWU 13 NTPC Korba STPS 2 1983 200 BHEL BHEL KWU 14 NTPC Korba STPS 3 1984 200 BHEL BHEL KWU 15 NTPC Ramagundam STPS 1 1984 200 Ansaldo Ansaldo KWU 16 NTPC Ramagundam STPS 2 1984 200 Ansaldo Ansaldo KWU 17 NTPC Ramagundam STPS 3 1984 200 Ansaldo Ansaldo KWU Sub total NTPC 13 2620 Central Sector LE Gas Based Sl. Name of Utility Name of Station Unit No. Year of Capacity Make No. Comm. (MW) 1 NTPC Dadri GT GT-1 1992 131 SIEMENS 2 NTPC Dadri GT GT-2 1992 131 SIEMENS 3 NTPC Dadri GT GT-3 1992 131 SIEMENS 4 NTPC Dadri GT GT-4 1992 131 SIEMENS 5 NTPC Auraiya GT GT-1 1989 111.19 MHI, Japan 6 NTPC Auraiya GT GT-2 1989 111.19 MHI, Japan 7 NTPC Auraiya GT GT-3 1989 111.19 MHI, Japan 8 NTPC Auraiya GT GT-4 1989 111.19 MHI, Japan 9 NTPC Kawas GT GT-1 1992 106 GE 10 NTPC Kawas GT GT-2 1992 106 GE 11 NTPC Kawas GT GT-3 1992 106 GE 12 NTPC Kawas GT GT-4 1992 106 GE 13 NTPC Gandhar GT GT-1 1994 131 ABB 14 NTPC Gandhar GT GT-2 1994 131 ABB 15 NTPC Gandhar GT GT-3 1994 131 ABB Sub total (Gas Based) 1785.8 Sub Total NTPC 28 4406 SUB TOTAL CENTRAL SECTOR 32 5246 TOTAL OF 12TH PLAN (LE) : NUMBER OF UNITS : 70 CAPACITY (MW) : 12066364 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Annexure-4.2 LIST OF THERMAL UNITS PROGRAMMED FOR R&M WORKS DURING 12TH PLAN. 3. STATE SECTOR Sl. No. State Name of Name of Unit Year of Capacity Make Utility Station No. Comm. (MW) Boiler TG Northern Region 1 U.P. UPRVUNL Anpara 1 1986 210 BHEL BHEL 2 U.P. UPRVUNL Anpara 2 1986 210 BHEL BHEL 3 U.P. UPRVUNL Anpara 3 1988 210 BHEL BHEL 4 U.P. UPRVUNL Anpara ‘B’ 4 1993 500 MHI TOSHIBA 5 U.P. UPRVUNL Anpara ‘B’ 5 1994 500 MHI TOSHIBA 6 U.P. UPRVUNL Obra 7 1974 100 BHEL BHEL Sub Total 6 1730 7 Punjab PSEB Ropar 1 1984 210 BHEL BHEL 8 Punjab PSEB Ropar 2 1985 210 BHEL BHEL 9 Punjab PSEB Ropar 5 1992 210 BHEL BHEL 10 Punjab PSEB Ropar 6 1993 210 BHEL BHEL Sub total 4 840 11 Haryana HPGCL Panipat 5 1993 210 BHEL BHEL Total Northern Region 11 2780 Western Region 12 Gujarat GSECL Wanakbori 1 1982 210 BHEL BHEL 13 Gujarat GSECL Wanakbori 2 1983 210 BHEL BHEL 14 Gujarat GSECL Ukai 3 1979 200 BHEL BHEL 15 Gujarat GSECL Ukai 4 1979 200 BHEL BHEL Sub total 4 820 16 Rajasthan RRVUNL Kota 1 1983 110 BHEL BHEL-SKODA 17 Rajasthan RRVUNL Kota 2 1983 110 BHEL BHEL-SKODA Sub total 2 220 Total Western Region 6 1040 Eastern Region 18 Jharkhand JSEB Patratu 9 1984 110 BHEL BHEL 19 Jharkhand JSEB Patratu 10 1986 110 BHEL BHEL Sub-Total 2 220 20 West Bengal DPL Durgapur 6 1985 110 AVB BHEL Total Eastern Region 3 330 TOTAL STATE SECTOR 20 4150 2. CENTRAL SECTOR – Coal based units Sl. Utility Name of Power station Unit Year of Capacity Make of Make of No. No. commissioning (MW) Boiler TG 1 NTPC Singrauli STPS 6 1986 500 BHEL BHEL 2 NTPC Singrauli STPS 7 1987 500 BHEL BHEL 3 NTPC Korba STPS 4 1987 500 BHEL BHEL 4 NTPC Korba STPS 5 1988 500 BHEL BHEL 5 NTPC Korba STPS 6 1988 500 BHEL BHEL 6 NTPC Ramagundem STPS 4 1988 500 USSR USSR 7 NTPC Ramagundem STPS 5 1989 500 BHEL BHEL 8 NTPC Ramagundem STPS 6 1989 500 BHEL BHEL 9 NTPC Farakka Stg-II 4 1992 500 Ansaldo BHEL 10 NTPC Farakka Stg-II 5 1994 500 Ansaldo BHEL 11 NTPC Tanda 2 1989 110 BHEL BHEL 12 NTPC Unchahar 1 1988 210 BHEL BHEL 13 NTPC Unchahar 2 1989 210 BHEL BHEL 14 NTPC Unchahar 3 1999 210 BHEL BHEL 15 NTPC Unchahar 4 1999 210 BHEL BHEL 16 NTPC Vindhyachal 1 1987 210 USSR USSR 17 NTPC Vindhyachal 2 1988 210 USSR USSR 18 NTPC Vindhyachal 3 1989 210 USSR USSR 19 NTPC Vindhyachal 4 1989 210 USSR USSR 20 NTPC Vindhyachal 5 1990 210 USSR USSR 21 NTPC Vindhyachal 6 1991 210 USSR USSR¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 365 Sl. Utility Name of Power station Unit Year of Capacity Make of Make of No. No. commissioning (MW) Boiler TG 22 NTPC Vindhyachal 7 1999 500 BHEL BHEL 23 NTPC Vindhyachal 8 2000 500 BHEL BHEL 24 NTPC Simhadri 1 2002 500 BHEL BHEL 25 NTPC Simhadri 2 2002 500 BHEL BHEL 26 NTPC Talcher STPS 1 1995 500 BHEL BHEL 27 NTPC Talcher STPS 2 1996 500 BHEL BHEL 28 NTPC Dadri 1 1991 210 BHEL BHEL 29 NTPC Dadri 2 1992 210 BHEL BHEL 30 NTPC Dadri 3 1993 210 BHEL BHEL 31 NTPC Dadri 4 1994 210 BHEL BHEL 32 NTPC Rihand STPS Phase - III 1 1988 500 BHEL BHEL 33 NTPC Rihand STPS Phase - III 2 1989 500 BHEL BHEL 34 NTPC Kahalgaon 1 1992 210 BHEL BHEL 35 NTPC Kahalgaon 2 1994 210 BHEL BHEL 36 NTPC Kahalgaon 3 1995 210 BHEL BHEL 37 NTPC Kahalgaon 4 1996 210 BHEL BHEL Sub Total 37 12890 Gas based units Sl. No. Name of Name of Station Unit No. Year of Capacity Make Utility Comm. (MW) 1 NEEPCO Kathalguri CCGT GT-1 1995 33.50 Mitsubishi, Japan 2 NEEPCO Kathalguri CCGT GT-2 1995 33.50 Mitsubishi, Japan 3 NEEPCO Kathalguri CCGT GT-3 1995 33.50 Mitsubishi, Japan 4 NEEPCO Kathalguri CCGT GT-4 1995 33.50 Mitsubishi, Japan 5 NEEPCO Kathalguri CCGT GT-5 1996 33.50 Mitsubishi, Japan 6 NEEPCO Kathalguri CCGT GT-6 1996 33.50 Mitsubishi, Japan 7 NEEPCO Kathalguri CCGT ST-1 1998 30.00 BHEL 8 NEEPCO Kathalguri CCGT ST-2 1998 30.00 BHEL Sub Total 8 261.00 TOTAL CENTRAL SECTOR 45 13151 TOTAL OF 12TH PLAN (R&M) : NUMBER OF UNITS : 65 CAPACITY (MW) : 17301 Total of 12th Plan (LE+R&M) 135 Capacity (MW) 29367 Abbreviations: R&M – Renovation & Modernisation;. U – Uprating; LE – Life Extension; Res – Restoration; MW – Mega Watt; CS-Central Sector: SS- State Sector $ - Installed Capacity for Dehar (Ph.b) at Sl. No.2 & Nagjhari (U-4 to 6) at Sl. No.21 are not included in the total as the same has already been accounted for at Sl. Nos. 1 and 6 respectively. Abbreviations: R&M – Renovation & Modernisation;. U – Uprating; LE – Life Extension; Res – Restoration; MW – Mega Watt; CS-Central Sector: SS- State Sector $ - Installed Capacity for Dehar (Ph.A) at Sl. No. 10, Nagjhari (U-4 to 6) at Sl. No. 22, Chilla at S. No. 4 and Khodri (Ph.B) at Sl. No. 56 are not included in the total as the same has already been accounted for at Sl. Nos. 1, 21, 37 and 3 respectively. Abbreviations: R&M – Renovation & Modernisation; RM&U—Renovation, Modernisation & Uprating, RM&LE—Renovation, Modernisation & Life Extension RMU&LE—Renovation, Modernisation, Uprating & Life Extension; R&M+Res.—Renovation & Modernisation + Restoration; RM&LE+Res.—Renovation, Modernisation & Life Extension + Restoration; RM&U+Res. —Renovation, Modernisation & Uprating + Restoration. MW – Mega Watt; Res – Restoration; U – Uprating; LE – Life Extension366 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Annexure 4.3 STATE WISE LIST OF HYDRO R&M, LIFE EXTENSION & UPRATING SCHEMES PROGRAMMED FOR COMPLETION DURING THE 12TH PLAN AS ON 31.03.2012 Sl. Project, CS/ SS Inst. (Rs. in Crs.) Benefits Category Year of No Agency Cap. Est. Cost Actual (MW) Completion (MW) (Prov.) Exp. Ongoing Schemes – Under implementation Himachal Pradesh 1 Bhakra LB, CS 5x108 489.77 222.15 540.00 RMU&LE 2014-15 BBMB (as on (LE) + 31.03.12) 90.00 (U) 2 Bassi, HPSEB SS 3x16.5+ 119.83 109.97 6.0(U)+ RMU&LE 2012-13 1x15 (as on 60 (LE) 31.03.12) Jammu & Kashmir 3 Chenani, SS 5x4.66 39.14 3.98 23.30 (LE) RM&LE 2013-14 J&KPDC (as on 31.03.12) 4 Sumbal Sindh, SS 2x11.3 34.17 18.89 - R&M 2012-13 J&KPDC (as on 31.03.12) 5 Lower Jhelum, SS 3x35 101.30 78.25 15.00 R&M+ 2012-13 J&KPDC (as on (Res.) Res. 31.03.12) Uttar Pradesh 6 Obra, UPJVNL SS 3x33 43.14 12.7 99.00 (LE) RM&LE 2015-16 (as on 31.03.12) 7 Rihand, SS 6x50 132.20 62.62 300.00 (LE) RM&LE 2015-16 UPJVNL (Rev.) (as on 31.03.12) Uttarakhand 8 Pathri, UJVNL SS 3x6.8 92.82 13.8 20.40 (LE) RM&LE 2013-14 (as on 31.03.12) Andhra Pradesh 9 Srisailam RB, SS 7x110 16.70 13.36 - R&M 2012-13 APGENCO (as on 31.03.12 ) 10 Lower Sileru, SS 4x115 8.75 6.66 - R&M 2012-13 APGENCO (as on 31.03.12) 11 Nagarjuna SS 1x110+ 33.35 13.90 - R&M 2012-13 Sagar, 7x100.8 (as on APGENCO 31.03.2012) Karnataka 12 Nagjhari, SS 2x150+ 45.22 51.99 45.00 RM&U 2013-14 U-4to6, KPCL 1x135 (as on (U) 31.03.12) Kerala 13 Sabirigiri, SS 5x55+ 104.36 96.95 300.00 RMU&LE 2012-13 KSEB 1x60 (as on (LE) + 31.03.12) 35.00(U) 14 Idamalayar, SS 2x37.5 11.70 5.45 - R&M 2012-13 KSEB (as on 31.03.12) 15 Poringal- SS 4x8 96.10 2.34 (as on 32.00 (LE)+ RM&LE 2015-16 kuthu,KSEB 31.03.12) 4 (U) Tamil Nadu 16 Periyar,TNEB SS 3x35+ 161.18 114.28 140.00 RMU&LE 2013-14 1x42 (as on (LE) + 31.03.12) 28.00(U)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 367 Sl. Project, CS/ SS Inst. (Rs. in Crs.) Benefits Category Year of No Agency Cap. Est. Cost Actual (MW) Completion (MW) (Prov.) Exp. West Bengal 17 Maithon, CS 2x20 49.05 3.76 40.00 (LE) RM&LE 2016-17 U-1&3, DVC (as on 31.03.12) 18 Jaldhaka St.I, SS 3x9 88.62 74.28 27.00 (LE) RM&LE 2012-13 WBSEB (as on 31.03.12) Orissa 19 Rengali SS 1x50 47.50 14.67 50 (LE) RM&LE 2012-13 OHPC (as on 31.03.12) 20 Hirakud-II, SS 3x24 125.52 58.73 72.00 (LE) RM&LE 2014-15 OHPC (as on 31.03.12) Assam 21 Kopili, NEEPCO CS 2x50 + 66.42 9.25 - R&M & 2013-14 2x50 (as on Refurbishment 31.03.12) of Units 1 & 2 22 Khandong, CS 2x25 25.05 10.15 50.00 RM&LE 2014-15 NEEPCO (as on (LE) 31.03.12) Sub Total (A) 4683 1932 966 1977 Ongoing Schemes – Under Tendering Jammu & Kashmir 23 Ganderbal, SS 2x3+ 21.95 8.23 9.00 (LE) RM&LE 2016-17 J&KPDC 2x4.5 (as on 31.03.12) Uttar Pradesh 24 Matatila, SS 3x10.2 10.29 1.00 30.6 (LE) RM&LE 2013-14 UPJVNL (as on 31.03.12) Uttarakhand 25 Khatima, SS 3x13.8 256.76 17.26 41.40 (LE) RM&LE 2014-15 UJVNL (as on 31.03.12) 26 Chilla Ph B SS 4x36 472.00 - 28.8(U) + RMU&LE 2015-16 UJVNL 144(LE) 27 Dhakrani, SS 3x11.25 113.18 - 33.75 (LE) RM&LE 2015-16 UJVNL 28 Dhalipur, SS 3x17 113.71 - 51.00 (LE) RM&LE 2015-16 UJVNL 29 Tiloth, UJVNL SS 3x30 163.75 - 90 (LE) RM&LE 2015-16 30 Kulhal, UJVNL SS 3x10 115.44 - 30(LE) RM&LE 2015-16 31 Chibro, UJVNL SS 4x60 201.25 - 240(LE) RM&LE 2015-16 32 Khodri SS 4x30 165.85 - 120(LE) RM&LE 2015-16 UJVNL Tamil Nadu 33 Sholayar-I, SS 2x35 40.68 - 14.00(U) + RMU&LE 2016-17 TNEB 70.00 (LE) Jharkhand 34 Panchet, CS 1x40 58.22 1.99 40.00 RM&LE 2016-17 U-1, DVC (as on (LE) 31.03.12) Orissa 35 Hirakud-I SS 2x37.5 296.83 0.25 75.00 (LE) RM&LE 2014-15 U5&6, OHPC (as on 31.03.12) 36 Balimela, SS 6x60 160 - 360(LE) RM&LE 2016-17 OHPC Sub Total (B) 1340.75 2189.91 28.73 1377.55368 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Sl. Project, CS/ SS Inst. (Rs. in Crs.) Benefits Category Year of No Agency Cap. Est. Cost Actual (MW) Completion (MW) (Prov.) Exp. Ongoing Schemes – Under DPR Preparation/Finalisation Himachal Pradesh 37 Giri, HPSEB SS 2x30 48.48 - 60.00 (LE) RM&LE 2014-15 Andhra Pradesh 38 Machkund , SS 3x17 124.45 - 15.25 (U) RMU&LE 2016-17 APGENCO (St.I) + & 114.75 (LE) 3x21.25 (St.II) Kerala 39 Sholayar, KSEB SS 3x18 54.00 0.044 54.00 (LE) RM&LE 2016-17 (as on 31.12.10) 40 Kuttiadi, KSEB SS 3x25 25.00 - 75.00 (LE) RM&LE 2016-17 Sub Total (C) 304 252 0.044 319 Ongoing Schemes – Under RLA Studies Andhra Pradesh 41 Upper Sileru, SS 4x60 10.00 - - R&M 2016-17 APGENCO Tamil Nadu 42 Kodayar Ph.I, SS 1x60 30.00 - 60.00 (LE) RM&LE 2015-16 TNEB 43 Kodayar SS 1x40 19.94 - 40.0(LE) RM&LE 2015-16 PH-II, TNEB Sub Total (D) 340 59.94 - 100.00 Total 6667.75 4433.67 994.72 3773.25 (A+B+C+D) [266.05(U) + 3492.20(LE) + 15(Res.)] Abbreviations: R&M – Renovation & Modernisation; RM&U – Renovation, Modernisation & Uprating; RM&LE – Renovation, Modernisation & Life Extension; RMU&LE – Renovation, Modernisation, Uprating & Life Extension; R&M+Res.-Renovation & Modernisation + Restoration; RM&LE+Res.- Renovation, Modernisation & Life Extension + Restoration; RM&U+Res. – Renovation, Modernisation & Uprating + Restoration. MW – Mega Watt; Res – Restoration; U – Uprating; LE – Life Extension.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 369 Chapter 5 GENERATION PLANNING 5.0 INTRODUCTION Economic development in the country is being achieved by meeting the increasing demand for power by setting up generation capacity addition. The demand for power is expected to grow but the available fuel resources for generation, to meet this demand, are limited. Also, a growth in generation capacity cannot be viewed in isolation and has to be achieved in an environment which is clean and green and sustainable in nature. Therefore, Low Carbon Growth Strategy is the order of the day. This has to be planned very meticulously as its development may not be very easily achievable. Till the 11th Plan period, the main focus of the planning process was to add large generation capacities, aiming to bridge the chronic gap between supply and demand. When most parts of rural India did not have access to electricity, and when urban India faced power cuts regularly, the over-riding consideration was to ensure ‘adequacy of power” by adding base-load capacities. During the 11th Plan, a capacity addition of 54,964 MW has been achieved against Mid- Term target of 62,374 MW. The situation in future may be different since Urban India accounts for over half the country’s GDP, and its electricity consumption peaks during the day, and drops significantly at night and on weekends. This demand pattern does not very well suit plants that are built to run on base load. Therefore, this approach of focussing mainly on adding coal- hydro-nuclear base load generating capacity, while necessary, may just not be sufficient during 12th Plan and beyond. Thus, additional parameters which need attention and planning are reliability and flexibility of the power system by creating peaking capacity and reserve margin in our system through appropriate type of power plants. This Chapter highlights the Principles of Generation Planning adopted in the Plan to assess the requirement of capacity addition in the 12th and 13th Plan periods. These principles are in consonance with the principles of Low Carbon Strategy and the power system planned is able to meet the additional parameters of reliability and flexibility also, in addition to capacity requirement, by specifically planning for peaking power and spinning reserves. 5.1 OPTIONS FOR POWER GENERATION IN INDIA The resources for power generation in our country are limited and since Low Carbon Growth Strategy has to be followed, all generation options need to be harnessed in the most optimum manner. Various Technology options also need to be explored to facilitate minimum carbon emission feasible. Fuel Options for Power Generation are: • Conventional Sources – Hydro, Nuclear, Natural gas, Coal and lignite. • Non-Conventional Sources- Solar, Wind, Biomass, Tidal, Geothermal, Waste to energy, Hydrogen/ fuel cells, etc. Emphasis on adoption of Non-conventional sources of energy which are renewable in nature, along with hydro and nuclear resources, is one of the most important and far reaching Initiatives towards achieving a low carbon growth strategy. However Non-conventional sources are generally non-despatchable in nature as well as provide more costly power and therefore, their implementation is restricted beyond a certain extent. Power plants can be set up based on the above conventional sources of power generation. The choice of source depends upon characteristics of each type of plant and a judicious decision is made on the choice of fuel depending upon a number of factors, major being economics of generation, fuel reserves, availability of fuel, dynamics of operation of the plant and impact on environment. These are supplemented by Non-Conventional Sources of power generation. 5.2 PRINCIPLES OF GENERATION PLANNING The three major aspects to be dealt with and considered in our planning process are: • Growth of the Power Generation Capacity to meet the demand pattern in accordance with the principles of Sustainable development. • To fulfil desired operational characteristics of the system (to meet varying demand) such as Reliability and flexibility. • Most efficient use of resource i.e. adoption of latest technological advancements in coal based generation; Combined Cooling, Heating and Power (CCHP) and Distributed Generation. The above aspects have been considered within realms of feasibility, while drawing up this National Electricity Plan along with the economics and the status of the various projects.370 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 5.2.1 Sustainable Development Sustainable Development of our country is our ultimate goal which encompasses economic development, maintaining environmental quality and social equity. This would also ensure that development takes place to fulfil our present needs without compromising the needs of our future generations. The importance and relevance of power development within the confines of Clean and Green Power is the most essential element. Such a growth depends upon the choice of an appropriate fuel/technology for power generation. Accordingly, the Plan takes into account the development of projects based on renewable energy sources as well as other measures and technologies promoting sustainable development of the country. The foremost Low Carbon Strategy Initiative is the choice of resources for power generation. Projects in the Plan based on Conventional Sources i.e. Hydro, Nuclear & Thermal are selected as a result of Studies carried out using Capacity Expansion Software programmes to meet the demand as stipulated by the 18th EPS Report. Power from Renewable Energy Sources has also been considered while carrying out these studies. The demand adopted for planning purpose is the 18th EPS demand projections. This demand is based on use of energy efficient technologies being used and energy conservation measures being adopted. Therefore, the planning strategy adopted is in accordance with low carbon strategy growth. 5.2.2 Operational Flexibility and Reliability The fuel sources and their respective technologies of power generation are multiple and varied. Accordingly, each has its own characteristics of operation. The demand of our electric system also varies with time of the day, season, year and the spatial location. Therefore, matching generation with load at all instances of time requires not only installation of adequate capacity but is also sensitive to the type of generation capacity, each with its unique characteristics of altering its output and the time taken to do so. Accordingly, this requirement of the system also needs to be considered when deciding upon the type of generation. It is, therefore, necessary to widen the scope of the planning process to take into account aspects of ‘reliability’ and ‘quality’ of power, apart from the adequacy and quantum of power. With the prevalence of load shedding/power cuts in almost all parts of the country, consumers are being compelled to resort to back up power from inverters and small diesel gensets. The amount spent by an average consumer in providing back up power varies from 50 paise to several Rupees per kWh. The consumers would be more than willing to pay a premium for their power consumption in return for the assurance of 24x7 supplies, which would obviate the need for them to incur the avoidable costs of owning and running back up power sources. This extra price, billed as a “reliability charge” by the utilities, would form the base for procuring “time of day” power from dedicated peaking plants. The higher price for power from peaking plants must be balanced against the higher efficiency, lower impact on environment and the flexibility made possible by these plants. Also, as peaking plants will operate for shorter duration than base-load plants, the weighted average cost of power drawn as a whole will not be significantly higher. a) Reliability of Power Reliable power system operation requires ongoing balancing of supply and demand in accordance with established operating criteria such as maintaining system voltages and frequency within acceptable limits. Changes in customer demand throughout the day and over the seasons are met by controlling generation when needed. The main characteristics of a reliable system are as follows: • The System is controlled to stay within acceptable limits during normal conditions. • The System performs acceptably after credible Contingencies. • The System limits the impact and scope of instability and cascading outages when they occur. • The System’s Facilities are protected from unacceptable damage by operating them within Facility Ratings. • The System’s integrity can be restored promptly if it is lost. • The System has the ability to supply the aggregate electric power and energy requirements of the electricity consumers at all times, taking into account scheduled and reasonably expected unscheduled outages of system components.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 371 To achieve reliability in the system, adequate Reserve capacity, spinning as well as non-spinning needs to be planned for in the system. Aspects related to the operation, ownership, modalities and nature of reserves also need to be determined. The location of the reserve generation capacity viz-a-viz the load centres is also critical. The National Electricity Policy stipulates a 5% Reserve Margin in our system. This has been considered while planning capacity addition requirement during the 12th and 13th Plans. Details of how this Reserve Margin is to be provided are furnished later in this Chapter (under Cl. 5.4 on ‘Planning Approach’). b) Flexibility of operation A system that is designed for base-load generation will lack the characteristics to respond dynamically or efficiently to the variation in demand within a short time. Apart from variation in demand, there is expected to be wide variability in generation as well, when the installed base of renewable energy plants increases as a result of obligation on Discoms to source their requirement from renewable energy sources (to meet RPO). Since system stability requires matching of generation with the demand at all instances of time, a certain degree of flexibility and ability of the generators to respond rapidly to the changing demand must be introduced into the system through appropriate generation plants. System should be able to meet additional demand arises due to unexpected demand and sudden unexpected outages of some units. Peaking demand in Indian states has been met, to some extent, by purchasing power from other states through bilateral agreements or through the mechanism of Unscheduled Interchange (UI) at frequency-linked prices and sometimes by load shedding also. The frequency band tolerated here (from 50.2 to 49.7 Hz) is far above that permitted in developed countries. However in the future this frequency band is expected to narrow down and this would reduce the available margin to meet the peaking requirement or reserve capacity through frequency linked interchange mechanism. Hydro power plants also can be started up quickly to meet sudden peaks, but this facility is restricted to those few states that have adequate water storage, all through the year. Peaking plants shall be environmentally-friendly and must comply with emission norms, so as to be located close to load centres. They must be able to start up (and stop) instantaneously and ramp up quickly, and in required steps, to match the spike in load. Their efficiency curve must be high and flat at different plant loads. They must be ‘all-season’ plants and use a fuel which is available throughout the year. As regards the Reserves in the Power System, in developed electricity markets abroad, it is customary to have several layers of reserves to meet the contingencies. The first rapid response to a drop in frequency of say 0.1 to 0.2 Hz is to bring on line a hot reserve plant (equal to the largest single unit in the grid) in 5-30 seconds, through automatic generation control (AGC). As a second step, fast reserve power plants (FRPP) are started in 4-15 minutes and ramped up to full load, after which the AGC plant will retreat to reserve mode. As a third step, replacement reserve power plants (RRPP) come on in 45-60 minutes, after which the FRPP plants return to their stand-by mode. The several layers of reserves as planned in the developed countries also take care of the flexibility of operation of the various reserves. Therefore, hot reserve which is required to operate within seconds is generally provided through Automatic Generation Control (AGC). The fast replacement reserve is required to be from a generation source which is capable of ramping up within 4-15 minutes to take over from the AGC sources. However Replacement Reserve Capacity could be from slower acting generation source to take over from fast acting reserves. Accordingly, each of these reserve capacity has to be from appropriate generation source having the requisite ramp up and ramp down characteristics. These principles of planning reserve capacity to provide flexibility of operation have been adopted in our planning process as detailed in Clause 5.4. 5.2.3 Efficient use of resource The fuels for power generation are scarce and must therefore be used most judiciously. From the environment point of view, it is essential that energy produced per K.Cal of fuel is maximum to the extent possible. This would minimize the pollution caused during the process of power production. Various measures taken/ being taken to maximize efficient use of resources i.e adoption of latest technological advancements in coal based generation; Combined Cooling, Heating and Power (CCHP) and Distributed Generation are detailed in Chapter 4 5.3 PLANNING TOOLS - DETAILS OF PLANNING MODELS CEA is carrying out detailed Generation expansion studies using the following computer software models for the generation planning exercises: (i) Integrated System Planning (ISPLAN)372 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] (ii) Electric Generation Expansion Analysis System (EGEAS) Salient features of the Planning models are discussed below. 5.3.1 Integrated System Planning [ISPLAN] Model For analyzing various investment alternatives for the system as a whole, the analytical tool should be capable of assessing the options for both additional generating capacity and transmission linkage expansion in an integrated fashion to achieve optimal solution. The major problems confronting planners are not only those related to optimizing the generating capacity requirement and reliability, but also location of the plant in relation to load centres, fuel resources, fuel transportation network and extension of the transmission grid. The power system planning is generally carried out over long time horizons and the planning model should be capable of analyzing a large number of scenarios within a reasonable time and with least effort. The ISPLAN model has the capability to address these system planning issues as an indicative planning tool for analyzing the major features of an optimal expansion plan for generating capacity, transmission network and fuel transport. The ISPLAN model works out the least cost power development plan based on minimisation of objective function, which comprises of Capital cost of projects (annualised), O&M cost (Annual), Fuel cost, Fuel transportation cost etc. Based on Linear Programming formulation, the model is capable of producing optimal expansion plans effectively and quickly with respect to a large number of alternative input assumptions. Criteria of optimality is the minimum discounted present worth of the total annual system cost for the year under study including the annualized capital cost of all new facilities (generating plants, transmission lines etc.) plus the operation and maintenance cost and cost of energy not served. The ISPLAN model considers operation of the power plants at a particular PLF depending upon the demand to be met such that the cost of delivered power is minimal. Accordingly, thermal stations with costly fuel will operate at low PLF i.e. only during period of peak demand and not during off-peak period. As per the model, all the DG based stations operate at low PLF. Some of the gas based stations also operate at low PLF. Even some of the existing load centre based coal stations located at in the state of Haryana, Punjab, Rajasthan, Gujarat, Tamil Nadu and even some imported coal based stations located in the state of Gujarat and Maharashtra operate at low plant load factor (PLF) on account of high delivered cost of fuel to these stations. However, the least cost expansion plan is not always the feasible plan. From feasibility point of view, a number of aspects like availability of land, water etc. obtaining various clearances for setting up the plant, placement of orders for main plant etc. need to be looked into. 5.3.2 Electric Generation Expansion Analysis System [EGEAS] The Electric Generation Expansion Analysis System (EGEAS) is a software package intended for use for expansion planning of an electric generation system. In this planning model the operation of the power system is simulated probabilistically. The load on the power system is represented both in terms of magnitude and time variation. The model yields the reliability indices, namely the Loss-Of-Load-Probability (LOLP), the expected value of Energy- Not-Served (ENS), and the reserve margin for an expansion power plan by minimising the objective function which is the present worth of the costs associated with operation of the existing and committed generating stations viz., the annualised/levelised capital cost and operating cost of new generating stations and cost of energy not served. The EGEAS model is capable of giving a number of expansion plans along with their objective functions and the reliability indices for each such plan. The optimal power plan is that plan for which the reliability indices are satisfied in accordance with certain criteria laid down by the planner, and the objective function is the lowest. The EGEAS model, being probabilistic in nature, provides for long range generation expansion planning as it yields very useful quantitative measures of reliability of power supply several years into the future, and at the same time gives an indication of the total cost of operating the existing and committed system and installing and operating the new system. The transportation of fuel and transmission of power are considered explicitly in the Integrated System Planning (ISPLAN) Model. Whereas the overall requirement of generating capacity is assessed using the EGEAS, the citing of new generating stations that use transportable fuel is done using ISPLAN. Under ISPLAN the broad features of the transmission system are also obtained.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 373 5.4 PLANNING APPROACH Beyond the 11th Plan, a planning approach whose exclusive aim is ‘adequacy of power’ (through the addition of base- load capacities equal or close to the maximum expected demand) would lead to sub-optimal operation of the system for a majority of the time. This is due to the poor turn-down capabilities inherent in power production technologies of base load plants such as coal and nuclear fuel. Moreover, this pattern of under-loading coal plants during off-peak hours down to 50% also results in power stations operating at sub-optimal PLFs leading to poor efficiency levels. It therefore becomes imperative to plan for a more optimal mix of base-load capacities, peaking solutions and reserve capacities. The base load capacities will take care of ‘bulk-power’ requirement, while the others will provide the system operator with sufficient reserve capacity and a valuable tool to take care of seasonal spikes or time-of-day variations – expected and unexpected-in demand. The dynamic response characteristics of such a balanced system would be far superior and would contribute to higher reliability. As unscheduled intra and inter-regional transfers would pose challenges, the right mix of base load and flexible solutions must preferably be determined and planned for, at the level of the state grid itself. This will ensure the most rapid, real-time response to local peaking needs. The Planning Approach is in the following sequence: 1) Preparation of All India Load Duration Curve An All India Load Duration Curve (LDC) was generated from the summation of hourly data for all states. The data was collected for past three years on monthly basis from various Regional Load Dispatch Centres and State Load Dispatch Centres. The hourly data was analyzed and corrected for any discrepancies in terms of load shedding, frequency correction, scheduled power cuts and any data errors. The hourly loads for each year were normalized, summed and averaged to unity. The peak demand was adjusted to unity and other hourly demands were scaled accordingly. It was assured that the All India LDC meets both Peak Demand and Energy Requirement monthly and annually published from time to time by CEA using a mathematical model. A typical Equivalent All India Load Duration Curve was generated based on Energy Requirement and Peak Load for 2016-17. A typical Load Duration Curve is illustrated in the Figure No. 5.2 below. Figure 5.2- All India Load Duration Curve (LDC)374 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 2) Generation Expansion Studies The above All India LDC was fed in as an input to the EGEAS Software to carry out generation expansion studies. Hydro, Renewable, Gas and Nuclear projects were accorded priority and taken as must run projects on account of their inherent advantages. The programme indicated the requirement of coal based projects to meet the demand requirement out of a shelf of coal based projects under implementation. The hydro and gas based projects that are likely to materialise during 12th Plan out of the shelf of projects under various stages of implementation have been considered as must run for the planning purpose. Nuclear projects have been considered for benefit during 12th Plan based on inputs from Nuclear Power Corporation. Renewable capacity considered during 12th Plan is also as per inputs from MNRE. Renewable capacity is considered for meeting the energy requirement only and not for peaking power requirement. The loading of the type of generation to meet the demand of the system based on cost economics is also illustrated in Fig 5.2. Reserve capacity As stipulated by NEP, 5% Spinning Reserve is to be provided. This corresponds to a capacity of about 10,000 MW by 12th Plan end. The requirement of this Reserve Capacity has been incorporated in the Plan by correspondingly reducing availability of coal based plants by 5% under normal operating conditions viz-a-viz normative availability from these plants. All the above options have a very quick response time and, therefore, adequately provide hot reserve, fast replacement reserve and replacement reserve. Peaking capacity A peaking load occurs owing to several reasons. It could be something that can be anticipated, as in morning peaks and evening peaks. It could happen when irrigation needs have to be met and several thousand pump sets come on simultaneously. Urban loads can shoot up in certain seasons (example, summer air-conditioning loads in Delhi). Or the peaking shortage could be due to a sudden drop in output from an infirm, renewable energy source such as wind turbines. Plants with rapid-response characteristics that make them ideal as ‘reserve’ plants can also be used to meet expected daily, time-of-day spikes and seasonal peaks. They can be an integral part of the grid operator’s armoury to provide flexibility. Peaking capacity also needs to come from quick response power plants. Therefore, foremost, pumped storage hydro plants and hydro plants with storage capacity provide peaking power. Also, gas based/ diesel based plants i.e. OCGT and engines are appropriate for peaking power. It is also considered appropriate to have distributed peaking capacity at major load centres in the country, perhaps 400 MW each at the 5 metropolitan cities totalling to about 2000 MW during 12th Plan to provide quality, reliable and flexible power supply. 3) Renewable capacity in planning process Renewable capacity has tremendous inherent advantages and has therefore been considered in the studies while estimating the capacity addition requirement from conventional power plants. Wind and solar energy was fixed with topmost priority as must run in the expansion exercise. The remaining capacity addition required was then estimated to meet the demand of the system. Different Scenarios corresponding to likely availability of renewables were worked out. Non-conventional source energy dispatch may be considered based on the availability but not in continuous manner.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 375 4) Retirement of Old thermal units Information was compiled in respect of old thermal power plants and gradually and systematically all the inefficient thermal units were considered for retirement while estimating the capacity addition requirement. During the 12th and 13th Plan, 4,000 MW each was retired. 5) Facility for Black Start after complete grid collapse As suggested above, a peaking capacity of about 2,000 MW could be provided, 400 MW at each 5 major metropolitan cities. This facility would also be useful in providing black start up facility in the event of a grid collapse. Combined Heat and Power Plants with a high efficiency of operation could also provide black start facilities immediately after grid collapse. 6) Time of Day (TOD) Tariff The National Electricity Policy and the National Tariff Policy mandates the State Commissions to introduce Time of the day (TOD) metering in order to reduce the demand of electricity during peak hours. It is desirable from the system point of view to flatten the load curve for which it is essential to reduce peak demand and encourage consumption/enhance load during off peak hours. This can be done by the following methods • Providing incentives to consumers for shifting their consumption to off-peak hours • Providing dis-incentives to consumers for consumption during peak hours • A combination of the above two. The above methods require differential tariffs for different time slots of peak and off-peak hours .It is well known that by controlling the price of electricity, it is possible to motivate individual consumers to either reduce/increase or shift their consumption from one point of time to another during the day, i.e. the consumer can be motivated to change his consumption pattern during the day. The major advantage of reducing the peak demand through TOD metering, as a tool for Demand Side Management, is that it allows the utility to reduce its generation/power purchase requirement, which reduces the overall cost of supply. Another advantage, which the utility has, is that the load factor of the system improves due to shifting of some peak load to off peak hours and leads to flattening of load curve. Improved load factor causes the Plant Load Factor of the generating stations to improve, thus reducing the generation cost. The consumers ultimately get benefited by availing power at lower rates during off-peak hours and also by reduction in supply costs of the utility. The incidence of load shedding is also reduced due to reduction in the peak load. Although, TOD tariff is applicable for high tension consumers in many states, it is not yet applicable at the retail level. TOD metering could be made applicable for those consumers where there is possibility of shifting the load of peak hours to off-peak hours. To have TOD tariff imposed at the retail level, all domestic consumers will have to be given a new meter that will segregate the peak and off-peak consumed units. 5.5 CONCLUSION Planning for capacity addition in 12th and 13th Plans has been carried out in Chapter 6 in accordance with the principles outlined in this Chapter. Reliability by providing Reserve Margins/Capacity Reserve and Flexibility by providing capacity having suitable ramp up and ramp down response to take care of peaking and reserve requirements, forms an important aspect while planning capacity addition in succeeding Chapters. ---+++--376 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Chapter 6 GENERATION CAPACITY ADDITION PROGRAMME FOR 12th & 13th PLANS 6.0 INTRODUCTION In this Chapter, the Generation Capacity addition required during the 12th Plan and tentative capacity addition required during the 13th Plan has been assessed based on Planning Principles and criteria detailed in Chapter 5. Studies have been carried out by CEA to assess the required capacity addition. A Shelf of projects for likely benefit during the Plan (projects which are in the pipeline) has been drawn up out of which the most feasible projects are selected based on the Status of the Projects. Out of the Conventional Energy Sources, Hydro and Nuclear are Clean and Green Sources and therefore, have been accorded priority by being considered as must run projects in the Studies, considering the viability and status of each project. Out of the remaining, thermal projects are selected based on the requirement & preparedness of the projects. Gas projects need to be set up and efforts need to be made to ensure adequate availability of gas. Peaking capacity and Reserve Capacity has also been planned in accordance with the Planning Principles. However, due care has also been taken to ensure that over capacity is not planned for, since our emphasis is on an optimum solution. 6.1 GENERATION FROM CONVENTIONAL SOURCES IN INDIA 6.1.1 Hydro India’s hydroelectric resources are estimated to be 84 GW at a 60% load factor. At an average load factor of about 30%, an installed capacity of 150 GW, excluding 15 GW of mini hydro-electric plants (less than 25 megawatts), may be feasible. Low carbon growth Strategy would ensure clean hydropower is used to its maximum potential for meeting peak loads and all new projects must be designed with this objective in mind. However the full development of India’s hydro-electric potential, while technically feasible, faces issues of water rights, resettlement of project affected people and environmental concerns –issues that must be resolved. 6.1.2 Nuclear Nuclear generation is also limited due to availability of natural uranium in the country. Department of Atomic Energy plans to put up a total installed nuclear power capacity of 20,000 MWe by the year 2020 in the country. As of now, the first stage programme based on indigenous fuel is in progress and has reached a stage of maturity. A beginning has been made of the 2nd stage programme with construction of 500 MWe PFBR (Prototype Fast Breeder Reactor). This is expected to be followed by four more 500 MWe units by the year 2020. Thereafter, it will be followed by a number of FBRs. When the capacity through FBRs builds up to reasonable level, the deployment of thorium for power generation through 3rd stage will begin and get realized in the long term. Although nuclear energy can make only a modest contribution over the next 15 years, longer-term consideration of even a modest degree of energy self-sufficiency suggests the need to pursue the development of nuclear power using thorium. With the signing up of the '123 Agreement' on nuclear cooperation between USA and India, and NSG’s waiver for supply of nuclear fuel to India, it is expected that some nuclear plants with foreign technology from friendly countries would be set up in the country. The availability of imported nuclear fuel and technology to India will help in accelerated capacity addition from nuclear power plants. Commencement of construction of reactors with imported technology during 11th/12th Plans is expected which will get commissioned in 13th Plan onwards. Development of nuclear parks with Mega capacity is also anticipated. 6.1.3 Gas Gas based stations are also restricted due to limited availability of gas. Therefore, coal based thermal generation is likely to continue to dominate power generation in the country and therefore requisite thrust is essential for the development of various environment friendly technologies including clean coal technologies. The choice of fuel for power generation would be governed by principles of sustainable development keeping in view energy security aspect.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 377 The production and supply of gas had not been keeping pace with the growing demand of gas in the country, including for that of power sector. The gas supply for gas based power stations in the country is inadequate, even the commitments of gas allocations made earlier to power stations were not fulfilled. The average gas supply during April 2012 was 51.94 MMSCMD against the requirement of 82.04 MMSCMD to operate the stations at 90% PLF, which was sufficient to operate these stations at about 56.98% PLF. In the year 2009-10, Government of India allocated 18 MMSCMD gas from KG D6 basin out of production of 40 MMSCMD in Phase I to Power Sector for existing power plants which helped in utilizing the stranded capacity of gas based power stations. The production at KG basin was expected to go up to 80 MMSCMD. Therefore subsequently, EGoM allocated bulk of the additional gas from KG basin to Power Sector. The allocation was based on 75% PLF to A.P. projects and 70% PLF to non A.P. projects. This additional allocation includes 12.29 MMSCMD gas on firm basis and 12 MMSCMD on fall back basis to existing power projects including projects likely to be commissioned during 2009-10. However, in view of reduced production from KG basin in recent past, even the firm quantity of allocated gas is not being supplied to power plants and the country is facing huge generation loss. Gas power plants, being a semi green power, needs to be promoted for reduction of our carbon foot prints and also because of many other inherent advantages of gas power plants as compared to conventional coal power plants. Presently, about 13,000 MW gas based capacity in the country is under various stage of construction. But non availability of gas to new power plants at present, have serious constraint in development of gas power plant in the country. Presently, existing power plants are operating at very low PLF and few power plants are lying idle due to non availability of gas. After start of actual supply of gas from KG basin to power projects, a number of proposals for setting up gas based power projects totalling to about 1,30,000 MW including expansion as well green field projects have been received. However, no gas is available for allocation to these projects. It is necessary to plan for about 20,000-25,000 MW gas based projects (subjected to availability of gas) to meet the capacity addition target and also to reduce our total CO emission. Two scenarios have been developed for 12th Plan in 2 view of uncertainty of gas. However, it is recommended that power projects be given higher priority as far domestic gas allocation is concerned in view of massive power shortage in the country and very low emission from gas plants which will help us in restricting CO emissions from power sector. 2 6.1.4 Coal/Lignite The coal reserves in the country are of the order of 277 billion tonnes. About 70% of the total coal produced is consumed in the Power Sector. However, there are impediments in the development of coal blocks due to delay in granting clearances and problems in acquisition of land. Forest clearance is a major problem as coal blocks are in forest area. Captive coal blocks are generally unexplored and are expected to take more time in development. According to present status of commissioning of power projects during 11th plan and production plan of CIL, the gap between demand and availability of domestic coal in the terminal year of the 11th plan was about 53 MT. To meet the above shortfall, utilities were advised to import 35 MT of coal. However, the actual import during 2011-12 was about 28 MT. Blending of imported coal may be technically feasible to the tune of about 10-15% only. Therefore, shortage of coal has resulted in stranded coal based capacity. The geological reserves of lignite have been estimated to be about 35.6 BT. Lignite is available at limited locations such as Neyveli in Tamil Nadu, Surat, Akrimota in Gujarat and Barsingsar, Palana, Bithnok in Rajasthan, Over 86% of the resources are located in the State of Tamil Nadu alone, whereas the rest 14% are distributed in other States. Since, lignite is available at a relatively shallow depth and is non-transferable, its use for power generation at pithead stations is found to be attractive. The cost of mining lignite has to be controlled to be economical for power generation. 6.2 NORMS ADOPTED FOR RELIABILITY CRITERIA EGEAS software has been used to carry out generation planning exercise for 12th & 13th Plan. The Power System is planned to meet the forecasted demand and ensure an expected level of reliability. Reliability is a measure of the ability of a system to perform its designated function under the designed conditions. In our Studies, Loss of Load Probability (LOLP) is the criteria adopted to reflect the capacity of the system to meet the peak load and Energy Not Served (ENS) to reflect the Energy Requirement not met in the System. LOLP is the probability that a system will fail to meet its peak load under the specified operating conditions. It is the proportion of days per year or hours per year when the available generating capacity is insufficient to serve the peak demand. This index is dimensionless and can also be expressed as a percentage.378 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ENS is the expected amount of energy which the system will be unable to supply to the consumers as a fraction of the total energy requirement. This index again is dimensionless and can also be expressed as a percentage. In other words these indicate as to how many units of energy requirement in a year are not met and correspondingly how many hours in a year the power demand is not met. Various countries in the world have adopted their own Reliability Criteria depending upon the status of their power system and the price affordability of the consumers to pay for the reliability of the system. It is evident that a more stringent and reliable system would yield higher cost of electricity which has to be borne by the consumer. Details of LOLP in some countries are as follows: Name of country LOLP(%) Cambodia 1.8 Laos 0.27 Thailand 0.27 Vietnam 0.27 Hong Kong 0.006 Bangladesh 1.0 Belgium 0.2 USA 0.03 China 0.14 Source: Information collected from website of above countries. Up till now, in India the reliability figures adopted were of LOLP – 1% and ENS- 0.15%. This was the case when India was faced by a huge power deficit situation. Now, the power shortage is expected to ease out. Therefore from 12th Plan onwards, more Stringent Reliability norms are required to be adopted. USA adopts an LOLP of 0.03% which appears to be reasonable for a developed economy. LOLP standard adopted by some South Asian countries is 0.27 %. It is therefore proposed that an LOLP of 0.2% and the Energy Not Served (ENS) of 0.05% shall be adopted for planning purposes from 12th Plan onwards. 6.3 PLANNING NORMS (CERC NORMS) The planning studies require accurate performance parameters of various type of generating units to assess their availability and energy generation capabilities. The peaking power availability and energy generation capacity are important parameters for meeting the projected demand of the country and various regions. Peak availability and PLF are key performance factors required for the planning studies and other features used for planning studies are the auxiliary power consumption, heat rate, capital cost of the generating units, etc. Different types of generating units have varied operational performance and accordingly different norms have been used for thermal (coal), combined cycle, hydro and nuclear projects. The generation planning norms for different sizes of thermal units are different and units of higher sizes i.e. 200 MW and above have shown consistently good performance over a long period. Higher size unit of 660 MW and above which are likely to be installed in future have been placed along with 500 MW units for auxiliary Power consumption, however for the purpose of heat rate, these units have been placed in a separate group. Combined cycle Gas Turbines (CCGT) are very efficient and have lower heat rates, however, their availability and PLF would depend on the availability of gas. The energy of the hydro units has been taken on the basis of the design energy of the project. 6.3.1 Peaking Availability The peaking availability (gross) of the various types of generating units is given in Table 6.1¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 379 Table 6.1 Figures in % PEAKING AVAILABILITY (GROSS) OF THERMAL/ NUCLEAR/ HYDRO POWER STATIONS Unit Size Existing Units Future Units Thermal (Coal) 800/660 MW - 88 500/250/210/200 MW 85 85 Below 200 MW 75 85 Below 200 MW operating below 20 % PLF 50 - at present Gas Based OCGT all sizes 90 90 CCGT all sizes 88 88 DG Sets All sizes 75 75 Lignite Based All sizes 80 80 Nuclear All sizes 68 68 Hydro All sizes 87.5 87.5 6.3.2 Auxiliary Power Consumption: The auxiliary consumption of the various types of generating units considered are given in Table 6.2 Table 6.2 I Coal Based Power stations Auxiliary Power Consumption 1. 800/ 660 MW class units 7.5% 2. 500 MW class units 7.5% 3. 250/210/200 MW class units 8.5% 4 Below 200 MW units 12.0 5 Lignite based units 12 % for <200 MW 9 % for >200 MW II Gas Based Power Stations 1 Combined cycle 3.0% 2 Open cycle 1.0% 3 DG sets/Gas Engines 1.0% III Hydro Power Stations 0.7% IV Nuclear Power Stations 160 MW BWR 10% 200/220 MW PHWR 12.5% 1000 MW LWR 7.8% 220/ 540 MW PHWR 12.5% 500 MW FBR 6.0% 6.3.3 Machine heat rate: The machine heat rates (gross) considered for the various thermal units are given in Table 6.3 Unit Size Gross Heat rate (Kcal/kWh) 800 MW 2300 660 MW 2300 500 MW 2425 200/210/250 MW KWU 2460 200/210/250 MW LMZ 2500 250/210/125 MW (lignite) 2750 100 MW 2750 50 MW class of units 3000 30 MW class of units 3300380 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Combined cycle Gas turbine 2000 Open cycle Gas turbine/DG Sets 2900 Open Cycle Gas Engines 2200 Combined Cycle Gas Engines 2000 6.3.4 Cost and heat value of GAS/ LNG Table 6.4 FUEL COST CALORIFIC VALUE (RS./TH.CUM) (KCAL /CUM) LNG 8,000 9,800 GAS (HVJ) 4,400 9,500 GAS (RELIANCE) 5,760 9,500 GAS (NER) 3,000 9,500 6.3.5 Financial Parameters Table 6.5 S.NO ITEM UNIT VALUE 1 DEBT - % OF CAPITAL COST % 70 2 EQUITY - % OF CAPITAL COST % 30 3 WORKING CAPITAL- % OF CAPITAL COST % 6 4 INTEREST ON DEBT % 11.5 5 RETURN ON EQUITY % 15.5+TAX 6 INTEREST ON WORKING CAPITAL % 12.25 7 DISCOUNT RATE % 9.0 8 O&M CHARGES POWER PLANT % 2.5 9 O&M CHARGES – TRANSMISSION LINE % 1.5 10 DEPRECIATION - POWER PLANT % 5.28 FOR 12 YEARS 6.3.6 Plant load factor: The plant load factor of thermal power stations (coal and gas-based) considered for the various type of plants are furnished in Table 6.6 Table 6.6 PLANT LOAD FACTORS OF THERMAL/ NUCLEAR POWER STATIONS Units PLF (%) Remarks Thermal Coal Based 800/660 MW 85.0 Future Units 500/250/210/200 MW 85.0 Existing and Future Units Below 100/110 MW 60 80% for future units 40 Units in ER and NER operating Below 20% PLF. Lignite Based 125/ 200/250 MW 75 Gas Based CCGT/CCGE 68.5 OCGT/OCGE 33 Nuclear Units All sizes 68 Normative Capacity Factor For hydro units, the energy generation is as per the designed energy generation in a 90% dependable year.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 381 6.4 GENERATION CAPACITY EXPANSION PLANNING DURING 12TH PLAN A Computer Model Study on Electric Generation Expansion Analysis System (EGEAS) programme was carried out in CEA to assess the installed capacity required to meet the above demand projections on the basis of National Load Duration Curve. The Studies are based on the following: • Demand to be considered as forecasted by 18th EPS i.e. Peak Demand - 1,99,540 MW and Energy Requirement – 1354 BU at bus bar. • Spinning Reserve of 10,000 MW (corresponding to 5% spinning reserve as stipulated by National Electricity Policy. (It has been represented that this figure of spinning reserve is on higher side & needs to be reviewed, it could be 2-3%. As India can’t afford to have 5% spinning reserve in terms of Investment, Task Force on peaking plants & spinning reserves constituted under the Chairmanship of Chairperson CEA will deliberate on this issue ) • Reliability Criteria - Loss of Load Probability (LOLP) < 0.2% and Energy Not Served (ENS) < 0.05%. • Actual Capacity addition considered during 11th Plan is 54,964 MW. • Capacity retired during 12th Plan is about 4000 MW which includes remaining units of coal & lignite under 100 MW (1500 MW already retired during 11th Plan), gas plants more than 30 years old (1987 & before) and some coal units of 110 MW. • Import of hydro power of 1,200 MW from neighbouring countries • First priority given to potential hydro projects followed by nuclear and gas based projects with a view to minimize CO2 emissions. • Seasonal Studies being carried out rather than Annual Studies with a view to ensure demand being met in all the seasons • Projects considered in the study are as under :- (cid:1) Hydro The hydro projects have been considered as must run in EGEAS study in line with our Low Carbon Growth Strategy. Considering the status of various projects under construction and uncertainties relating to geological surprises, natural calamities like floods, R&R and environmental issues expected to be experienced during the execution of the hydro projects, it is proposed that a hydro capacity addition of about 10,897 MW is likely during 12th Plan. Details of hydro projects are furnished in Annexure 6.1. Additional list of hydro projects which could materialised during 12th /13th Plan totalling to 2435 MW furnished in Annexure 6.2. In addition shelf of hydro projects totalling to 19,675 MW has also been identified for likely benefit during 13th Plan. Details are furnished in Annexure 6.8. (cid:1) Nuclear A nuclear capacity of 5,300 MW has been considered as per the information furnished by Nuclear Power Corporation. Details are furnished in Annexure 6.1. (cid:1) Thermal Gas Based Plants Addition of gas based capacity is considered necessary to reduce CO emissions. Modern combined cycle gas turbines 2 (CCGTs) have high efficiency of around 55% compared to coal based plants (Gross efficiency of supercritical units is 38 to 40%). Gas turbines/Engines could be located near the load centre with a view to minimize the requirement of transmission system and could be operated in a manner so as to maximize the output during the peak hours and minimize during the off-peak hours so as to utilize the available gas which is scarce, optimally. In view of expected increase in coal shortage during 12th Plan, we should plan for about 12,000-15,000 MW gas based projects to meet the capacity addition target and also to reduce our total CO emission. It is recommended that power 2 projects be given higher priority as far domestic gas allocation is concerned in view of massive power shortage in the country and very low emission from gas plants which will help us in restricting CO emissions from power sector. As 2 the availability of gas is uncertain only 14,540 MW gas based projects have been considered during 12th plan in the382 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] high gas scenario and 2,540 MW gas based plants for which gas is assured from local sources in the Low Gas Scenario. Project-wise details of gas based projects totalling to 2,540 MW considered during 12th Plan is given in Annexure 6.1. In addition, many other projects totalling to about 13,000 MW capacities are also under construction and can be commissioned during 12th Plan if gas is made available to these projects. The details of these projects are given in Annexure 6.6 Coal based Plants The balance capacity to meet the stipulated demand is proposed to be met from coal based projects. Thus, coal is expected to be main fuel for 12th Plan capacity addition too. A shelf of projects have been identified which are likely to yield benefits during 12th Plan. The project-wise details of capacity totalling to 69,800 MW from coal/ lignite which is under construction and most likely to materialise during 12th plan are furnished in Annexure 6.1. In addition to projects listed in Annexure 6.1, certain other thermal projects totalling to 33,870 MW are also under construction for likely benefits during 12th Plan, details of which are given in Annexure 6.2. A list of power projects under bulk tendering, totalling to 14,460 MW is enclosed as Annexure 6.3. Certain power projects totalling to 13,050 MW for which order for main plants have been placed but certain clearance are awaited; details of these projects are given in Annexure 6.4. A list of projects totalling to 11,200 MW for which coal has been tied up but orders for main plant not placed is given in Annexure 6.5. In addition, certain project developers have also requested for inclusion of their projects in the 12th Plan list. These projects totalling to 13,111 MW are in initial stage and could come up in 12th Plan. Details of these projects are given in Annexure 6.7. 6.5 12TH PLAN STUDY AND RESULTS EGEAS Studies were carried out to assess the total capacity addition requirement during the 12th Plan to meet the demand within the confines of the reliability criteria. Earlier Studies were conducted only to estimate the Capacity addition required to meet the Annual Demand projections. However, it was considered that Annual Studies are not adequate as they would not eliminate the possibility that this capacity would be sufficient for the system to meet the reliability criteria in each of the 5 seasonal blocks of months in a year. These five blocks of months are April-June, July-September, Oct-November, December-January and February- March. Seasonal Studies were, therefore, considered to be essential to ensure that the seasonal demand of the system would be met in each block when considering the energy of hydro plants in each of the above blocks of month. Therefore studies for each 5 seasons i.e. 5 blocks of months in a year were carried out using EGEAS model to assess the capacity addition requirement. Hydro, Gas and Nuclear based capacity is given the foremost priority due to their inherent advantages towards a Low Carbon growth Strategy. Therefore, capacity from these sources which is likely to materialise during 12th Plan has been considered as must run in the various Scenarios. Renewable capacity has also been considered as must run capacity. However, only energy from this capacity has been considered to meet energy requirement. Four scenarios were developed for generating capacity addition during 12th Plan. The scenarios are as follows: Scenario 1 – Low Renewables (18,500 MW) , Low Gas (2,540 MW) (Base Case) Scenario 2 – Low Renewables (18,500 MW), High Gas (14,540 MW) Scenario 3 – High Renewables (30,000 MW) , High Gas (14,540 MW) Scenario 4 – High Renewables (30,000 MW), Low Gas (2,540 MW) Hydro Imports of 1,200 MW during 12th Plan have been considered in all the four scenarios. Details of Various Scenarios and study Results in each case are as follows: • Scenario – 1– 18th EPS Demand - Low Renewable (18,500 MW), Low gas (2,540 MW)- Base Case TYPE 12th Plan Capacity Requirement (MW) Hydro 10,897 Thermal 70,903 Coal 67,843 Lignite 520 Gas 2,540¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 383 Nuclear 5,300 TOTAL (Conventional) 87,100 Wind 11,000 Solar 4,000 Other RES 3,500 TOTAL (RES) 18,500 Retirement During 12th 4,000 Plan • Scenario – 2–18th EPS Demand - Low Renewable(18,500 MW), High gas (14,540 MW) TYPE 12th Plan Capacity Requirement (MW) Hydro 10,897 Thermal 70,903 Coal 55,843 Lignite 520 Gas 14,540 Nuclear 5,300 TOTAL (Conventional) 87,100 Wind 11,000 Solar 4,000 Other RES 3,500 TOTAL (RES) 18,500 Retirement During 12th 4,000 Plan • Scenario -3 - 18th EPS Demand - High Renewables (30,000 MW), High Gas(14,540MW) TYPE 12th Plan Capacity (MW) Hydro 10,897 Thermal 67,703 Coal 52,643 Lignite 520 Gas 14,540 Nuclear 5,300 TOTAL 83,900 (Conventional) Wind 15,000 Solar 10,000 Other RES 5,000 TOTAL (RES) 30,000 Retirement During 4,000 12th Plan • Scenario – 4– 18th EPS Demand - High Renewable(30,000 MW), Low gas (2,540MW) TYPE 12thPlan Capacity (MW) Hydro 10,897 Thermal 66,903 Coal+Lignite 63,843 Lignite 520 Gas 2,540 Nuclear 5,300384 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] TOTAL (Conventional) 83,100 Wind 15,000 Solar 10,000 Other RES 5,000 TOTAL (RES) 30,000 Retirement During 12th 4,000 Plan OUT OF THE ABOVE SCENARIOS, SCENARIO-1 HAS BEEN CONSIDERED AS THE BASE CASE FOR PLANNING CAPACITY ADDITION DURING THE 12TH PLAN. Details of Base Case are as follows: 12th Plan Programme Total Capacity Requirement - 87,100 MW (Conventional) Hydro - 10,897 MW Nuclear - 5,300 MW Thermal - 70,903 MW • Coa+Lig - 68,363 MW • Gas - 2,540 MW The requirement of capacity addition during 12th plan is 87,100 MW. However based on status of projects under construction, a list of projects for likely benefits during 12th Plan totalling to a capacity of 88,537 MW has been identified and the same is enclosed as Annexure 6.1. It may also be mentioned that all of the projects identified for likely benefits during 12th Plan are presently under construction. In addition to above, additional shelf of projects is also under construction/ planning stage and some of these projects could materialize during 12th Plan. The shelf of these projects is given in Annexure 6.2. Thus, in case some of the projects identified for 12th Plan is delayed due to unforseen reasons, other projects (back up projects) may get commissioned during 12th Plan. Thus a capacity addition of about 88,000 MW is expected during 12th Plan with high degree of certainty. Of course, fuel availability to these projects is major concern and need to be addressed. 6.6 TENTATIVE PLANNING FOR GENERATION CAPACITY EXPANSION DURING 13TH PLAN The studies for assessing the tentative capacity addition requirement during the 13th Plan was carried out based on the following considerations: • Demand to be considered as forecasted by 18th EPS – Peak Load- 2,83,470; Energy Requirement - 1904 BU • Spinning Reserve -5% i.e. about 14,000 MW. • Reliability Criteria – Loss of load probabilities < 0.2 % and Energy not served < 0.05 %. • Actual Capacity addition considered during 11th Plan is 54,964 MW. • 12th Plan capacity of about 87,100 MW in corresponding scenario. • Retirement of 4,000 MW which includes coal units lesser than 200 MW (commissioned before 1982) and gas units commissioned before 1992 (more than 20 years old). • Import from neighbouring countries – 8,040 MW Hydro capacity. 6.7 STUDY RESULTS FOR 13TH PLAN TENTATIVE CAPACITY EXPANSION EGEAS Studies were carried out to assess the total capacity addition requirement during the 13th Plan to meet the demand within the confines of the reliability criteria. Seasonal Studies were carried out as in the 12th Plan. Hydro, Gas and Nuclear based capacity is given the foremost priority due to their inherent advantages towards a Low Carbon growth Strategy. Therefore this capacity is considered as must run in the various Scenarios. Renewable capacity has also been considered as must run capacity.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 385 Four scenarios were developed for tentative generating capacity addition during 13th Plan. The scenarios are as follows: Scenario 1 – Low Renewables (30,500 MW), No Gas. Scenario 2 – Low Renewables (30,500 MW), High Gas (13,000 MW). Scenario 3 – High Renewables (45,000 MW), High Gas (13,000 MW). Scenario 4 – High Renewables (45,000 MW), No Gas. Considering above must run projects, the balance capacity is proposed to be met from coal based projects. These Scenarios are based on corresponding Scenarios materializing in the 12th Plan. The details of 13th Plan capacity addition requirement corresponding to the four Scenarios are given as under: Hydro Imports of 8,040 MW during 13th Plan have been considered in all the four scenarios. • Scenario-1 – Low Renewables (30,500 MW) - No Gas TYPE 13th Plan Capacity Addition Requirement (MW) Hydro 12,000 Thermal 56,400 Coal 56,400 Gas 0 Nuclear 18,000 TOTAL (Conventional) 86,400 Wind 11,000 Solar 16,000 Other RES 3,500 Total (RES) 30,500 Retirement During 13th Plan 4,000 • Scenario-2 – Low Renewables (30,500 MW) - High Gas (13,000 MW) TYPE 13th Plan Capacity (MW) Hydro 12,000 Thermal 58,200 Coal 45,200 Gas 13,000 Nuclear 18,000 TOTAL (Conventional) 88,200 Wind 11,000 Solar 16,000 Other RES 3,500 Total (RES) 30,500 Retirement During 13th Plan 4,000 • Scenario-3 – High Renewables (45,000 MW) - High Gas (13,000 MW) TYPE 13th Plan Capacity (MW) Hydro 12,000 Thermal 50,200 Coal 37,200 Gas 13,000 Nuclear 18,000 TOTAL (Conventional) 80,200 Wind 20,000 Solar 20,000 Other RES 5,000 Total (RES) 45,000 Retirement During 13th Plan 4,000386 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] • Scenario-4 – High Renewables (45,000 MW) - No Gas TYPE 13th Plan Capacity (MW) Hydro 12,000 Thermal 54,800 Coal 54,800 Gas 0 Nuclear 18,000 TOTAL (Conventional) 84,800 Wind 20,000 Solar 20,000 Other RES 5,000 Total (RES) 45,000 Retirement During 13th Plan 4,000 OUT OF THE ABOVE SCENARIOS SCENARIO-1 HAS BEEN CONSIDERED AS THE BASE CASE FOR THE 13TH PLAN. The capacity addition required during the 13th Plan is as follows: 13th Plan Programme Total Capacity - 86,400 MW (Conventional) Hydro - 12,000* MW Nuclear - 18,000 MW Thermal - 56,400 MW Coal - 56,400 MW Gas - Nil * excludes 8,040 MW imports from hydro plants of neighbouring countries. It may be mentioned that 18,000 MW nuclear capacity during 13th Plan has been considered as per the programme of NPC. In case this capacity does not materialize, the same could be replaced by coal based capacity. During the 13th Plan, the capacity addition is from more efficient Units based on latest technologies. Thermal capacity addition is from units of higher size i.e. 660/800 MW in all cases with supercritical technologies. These Initiatives are in accordance with our strategies for clean and Green Power. It is recommended that during the 13th Plan, capacity addition from coal fired power plant must be from super critical units only. The required capacity addition during the 13th Plan will be of the order of about 86,400 MW. Any projects slipping from 12th Plan capacity addition programme MW will be added in the 13th Plan capacity addition programme. Thus it is clear that huge capacity addition will be required during 13th Plan for which advance Planning/advance action is required during the 12th Plan itself by all concerned. 6.8 CONCLUSION • The power demand projections considered for planning capacity addition are as per the 18th EPS Report. Details are as follows: (cid:1) End of 12th Plan are – Peak Demand of 199,540 MW and Energy Requirement of 1354 BU. (cid:1) End of 13th Plan- Peak Demand- 283470 MW and Energy Requirement – 1904 BU. • A Capacity addition of 87,100 MW would be required to be added in the country during the 12th Five Year Plan based on actual capacity addition of about 54,964 MW during the 11th Plan, spinning reserve requirement of 5% as per NEP, retirement of old inefficient thermal units of about 4,000 MW and reliability criteria of 0.2% LOLP & 0.05% ENS adopted by CEA. • The total capacity addition requirement in the country for 12th Plan has been proposed as under: Total Capacity (excluding renewable) - 87,100 MW Hydro - 10,897MW Nuclear - 5,300 MW¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 387 Thermal - 70,903 MW • Coal - 67,843 MW • Lignite - 520 MW • Gas - 2,540 MW Indigenous capacity required to be developed – 87,100 MW (1,200 MW imports have been assumed from neighbouring countries) . • The total capacity addition requirement in the country for 13th Plan has been proposed as under: Total Capacity (excluding renewable) - 86,400 MW Hydro - 12,000 MW Nuclear - 18,000 MW Thermal - 56,400 MW • Coal - 56,400 MW Hydro Import – 8,040 MW • Indigenous capacity required to be developed – 86,400 MW (Considering 8,040 MW imports from neighbouring countries ). ----+++----388 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Annexure 6.1 SUMMARY OF PROJECTS UNDER CONSTRUCTION FOR LIKELY BENEFITS DURING 12TH PLAN (2012-17) (Figures in MW) THERMAL BREAKUP TOTAL HYDRO NUCLEAR TOTAL COAL LIGNITE GAS/LNG THERMAL CENTRAL 6004 13800 250 827.6 14878 5300 26182 SECTOR STATE 1608 12210 0 1712.0 13922 0 15530 SECTOR PRIVATE 3285 43270 270 0.0 43540 0 46825 SECTOR ALL-INDIA 10897 69280 520 2539.6 72340 5300 88537 BLOCK IMP WASHERY LINKAGE CIL BLOCK TOTAL (TL) COAL REJECT REQUIRED COAL BASED 50504 5440 8310 4246 330 450 69280 CAPACITY 2012-13 2013-14 2014-15 2015-16 2016-17 TOTAL CENTRAL 6668 4992 1870 4491 8160 26182 SECTOR STATE SECTOR 4048 3866 4846 2260 510 15530 PRIVATE SECTOR 7370 10445 14242 10328 4440 46825 ALL-INDIA 18086 19303 20958 17079.0 13110 88537 Hydro 802 2639 2543 1613 3300 10897 Thermal 15284 16664 17915 15466 7010 72340 Nuclear 2000 0 500 0 2800 5300 Total 18086 19303 20958 17079 13110 88537¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 389 LIST OF PROJECTS UNDER CONSTRUCTION FOR LIKELY BENEFITS DURING 12TH PLAN (2012-17) Sl. Fuel Capacity Project Name State Developer Sector No. Type (MW) 1. Lower Jurala HEP A.P. APGENCO S Hydro 240 2. Pulichintala HEP A.P. APGENCO S Hydro 120 3. Nagarjuna Sagar TR HEP A.P. APGENCO S Hydro 50 Sri Damodaram Sanjeevaiah TPP 4. A.P. APGENCO S Coal 1600 (Krishnapattnam TPP) U1,2 5. Rayal seema TPP U6 A.P. APGENCO S Coal 600 Meenakshi Energy 6. Thamminapatnam TPP U3,4 A.P. P Coal 700 Pvt. Ltd., Ngarjuna Nagarjuna Construction Company Ltd 7. A.P. Construction P Coal 1320 Ph-I U-1,2 Company Ltd Thermal Powertech 8. Painampuram TPP U 1,2 A.P. P Coal 1320 Corporation Ltd. 9. Bhavanapaddu TPP U-1,2 A.P. East Coast Energy P Coal 1320 Meenakshi Energy 10. Thamminapatnam TPP U1,2 A.P. P Coal 300 Pvt. Ltd., Simhapuri Energy 11. Simhapuri TPP Ph-I, U 2 A.P. P Coal 150 Pvt. Ltd., 12. Hinduja TPP,U1-2 A.P. Hinduja P Coal 1050 SUB TOTAL (AP) 8770 1. Pare HEP Ar. P NEEPCO C Hydro 110 2. Kameng HEP Ar. P NEEPCO C Hydro 600 3. Subansiri Lower HEP Ar. P NHPC C Hydro 1000 SUB TOTAL (ARUNACHAL 1710 PRADESH) 1. Bongaigaon TPP U 1,2,3 Assam NTPC C Coal 750 2. Namrup CCGT Assam APGCL S Gas 100 SUB TOTAL (ASSAM) 850 1. Muzaffarpur (Kanti) TPP U 3,4 Bihar NTPC JV C Coal 390 2. Barh STPP-I U 1,2,3 Bihar NTPC C Coal 1980 3. Barh STPP-II U 1,2 Bihar NTPC C Coal 1320 4. Nabinagar TPP U1-4 Bihar NTPC JV C Coal 1000 SUB TOTAL (BIHAR) 4690 1. Sipat-I TPP U 3 Chhattisgarh NTPC C Coal 660 2. Korba West St.III TPP U5 Chhattisgarh CSEB S Coal 500 3. Marwah TPP U1-2 Chhattisgarh CSEB S Coal 1000 Korba West Power 4. Avantha Bhandar TPP U1 Chhattisgarh P Coal 600 Company Ltd. Maurti Clean Coal & Power Ltd.TPP Maurti Clean Coal 5. Chhattisgarh P Coal 300 U1 & Power Ltd.390 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Sl. Fuel Capacity Project Name State Developer Sector No. Type (MW) LANCO 6 Lanco Amarkantak TPP U- 3,4 Chhattisgarh Amarkantak Pvt P Coal 1320 Ltd R.K.M. PowerGen 7 Uchpinda TPP U1-3 Chhattisgarh P Coal 1080 Pvt Ltd SKS Ispat and 8 Vinjkote (Darrampura) TPP U1-3 Chhatisgarh P Coal 900 Power Ltd. KSK Mahanadi 9 Akaltara (Nariyara) TPP U 1-3 Chhattisgarh Power Company P Coal 1800 Limited 10 Kasaipalli TPP U 2 Chhattisgarh ACB India P Coal 135 11 Swastik Korba TPP U 1 Chhattisgarh ACB India P Coal 25 12 Vandana Vidyut TPP U 1,2 Chhattisgarh Vandana Vidyut P Coal 270 Bharat Aluminium 13 Balco TPP U-1,2 Chhattisgarh P Coal 600 Co. Ltd Athena 14 Athena Singhtarai TPP U-1 Chhattisgarh Chhattisgarh Power P Coal 600 Ltd. 15 D B Power TPP U-1,2 Chhattisgarh DB Power Ltd P Coal 1200 16 TRN Energy TPP U-1,2 Chhattisgarh TRN Energy P Coal 600 17 Ratija TPP Chhattisgarh ACB India P Coal 50 18 Raigarh TPP U1,2 Chhattisgarh Jindal Power Ltd P Coal 1200 SUB TOTAL (CHHATTISGARH) 12840 1 Pragati -III (BAWANA) CCGT Delhi PPCL S Gas/LNG 750 SUB TOTAL (DELHI) 750 1 KAPP U-3,4 Gujarat NPC C Nuclear 1400 2 Sikka TPP Ext. U3 Gujarat GSECL S Coal 250 3 Ukai TPP EXT U6 Gujarat GSECL S Coal 500 4 Pipavav JV CCGT Block-1,2 Gujarat GSECL S Gas/LNG 702 The Tata Power 5 Mundra UMPP, U 2 Gujarat P Coal 800 Company Ltd Essar Power Salaya 6 Salaya TPP U 2 Gujarat P Coal 600 Ltd SUB TOTAL (GUJARAT) 4252 1 Parbati-II HEP H.P. NHPC C Hydro 800 2 Rampur HEP H.P. SJVNL C Hydro 412 3 Kol Dam HEP H.P. NTPC C Hydro 800 4 Chamera-III HEP H.P. NHPC C Hydro 231 5 Parbati - III HEP H.P. NHPC C Hydro 520 6 Kashang - I HEP H.P. HPPCL S Hydro 65 7 Uhl-III HEP H.P. BVPC S Hydro 100 8 Sawara Kuddu HEP H.P. HPPCL S Hydro 111 9 Kashang II & III HEP H.P. HPPCL S Hydro 130¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 391 Sl. Fuel Capacity Project Name State Developer Sector No. Type (MW) 10 Sainj HEP H.P. HPPCL S Hydro 100 N S L Tidong 11 Tidong-I HEP H.P. Power Generation P Hydro 100 Ltd Himachal Sorang 12 Sorang HEP H.P. P Hydro 100 Power Pvt. Ltd Tangnu Romai 13 Tangnu Romai-I HEP H.P. Power Generation P Hydro 44 Ltd LANCO Green 14 Budhil HEP H.P. P Hydro 70 Power Pvt Ltd SUB TOTAL (HP) 3583 1 Indira Gandhi TPP (Jhajjar) JV U-3 Haryana NTPC C Coal 500 2 Mahatmi Gandhi Jhajjar TPP U2 Haryana China Light Power P Coal 660 SUB TOTAL (HARYANA) 1160 1 Kishan Ganga HEP J&K NHPC C Hydro 330 2 Uri-II HEP J&K NHPC C Hydro 240 3 Nimoo Bazgo HEP J&K NHPC C Hydro 45 4 Chutak HEP J&K NHPC C Hydro 44 J&K State Power 5 Baglihar-II HEP J&K Development Corp. S Hydro 450 Ltd. SUB TOTAL (J&K) 1109 1 Bokaro TPP A Exp U1 Jharkhand DVC C Coal 500 2 Koderma TPP U2 Jharkhand DVC C Coal 500 Corporate Power 3 Mata Shri Usha TPP Ph-I U 1,2 Jharkhand P Coal 540 Ltd. Adhunik Power & Adhunik Power & Natural Resources 4 Jharkhand Natural Resources P Coal 540 Ltd TPP U1,2 Ltd. SUB TOTAL (JHARKHAND) 2080 1 Thottiar HEP Kerala KSEB S Hydro 40 2 Pallivasal HEP Kerala KSEB S Hydro 60 SUB TOTAL (KERALA) 100 1 Vindhyachal TPP St-IV U-11,12 MP NTPC C Coal 1000 2 Satpura TPP EXT U-10,11 MP MPGENCO S Coal 500 3 Shree Singhaji TPP U-1,2 MP MPGENCO S Coal 1200 MB Power 4 Annupur TPP Ph-I U1,2 MP (Madhya Pradesh) P Coal 1200 Ltd.392 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Sl. Fuel Capacity Project Name State Developer Sector No. Type (MW) Bina Power Supply 5 Bina TPP U 1,2 MP Comp. Ltd (Jaypee P Coal 500 Group) Reliance Power 6 Sasan UMPP U 1,2 MP P Coal 1320 Ltd. 7 Maheshwar HEP U 1-10 MP SMHPCL P Hydro 400 DB Power (Madhya 8 D B Power TPP, Sidhi U-1 MP P Coal 660 Pradesh) Ltd 9 Jhabua TPP U1 MP Jhabua Power Ltd P Coal 600 SUB TOTAL (MP) 7380 1 Mauda TPP U1,2 Maharashtra NTPC C Coal 1000 2 Chandrapur TPP Ext. U 8 Maharashtra MAHGENCO S Coal 500 3 Koradi TPP Ext U 8 Maharashtra MAHGENCO S Coal 660 4 Parli TPP U 3 Maharashtra MAHGENCO S Coal 250 India Bulls Power 5 India Bulls- Amravati TPP Ph-I,U1-5 Maharashtra P Coal 1350 Limited India Bulls 6 India Bulls - Nasik TPP Ph-I,U1-5 Maharashtra P Coal 1350 Realtech Limited Dhariwal Dhariwal Infrastructure (P) Ltd TPP 7 Maharashtra Infrastructure (P) P Coal 600 U1,2 LTD GMR EMCO 8 EMCO Warora TPP U 1,2 Maharashtra P Coal 600 Energy Ltd Vidarbha Industries 9 Butibori TPP Ph -II U 1 Maharashtra P Coal 300 Power Ltd Lanco Mahanadi 10 Lanco Mahanadi, Vidarbha TPP U1,2 Maharashtra P Coal 1320 Power Pvt Ltd 11 Tiroda TPP PH-I U 1,2 Maharashtra Adani Power Ltd P Coal 1320 12 Tiroda TPP Ph-II U1 Maharashtra Adani Power Ltd P Coal 660 Gupta Energy Pvt 13 GEPL TPP U-1,2 Maharashtra P Coal 120 Ltd Ideal Energy 14 Bela TPP U 1 Maharashtra P Coal 270 Projects Ltd SUB TOTAL (MAHARASHTRA) 10300 1 New Umtru HEP Meghalaya MeECL S Hydro 40 2 Myntdu St-I HEP ADDL UNIT Meghalaya MeSEB S Hydro 42 SUB TOTAL (MEGHALAYA) 82 1 Tuirial HEP Mizoram NEEPCO C Hydro 60 SUB TOTAL (MIZORAM) 60 Jindal India 1 Derang TPP U1 Orissa P Coal 600 Thermal Power Ltd¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 393 Sl. Fuel Capacity Project Name State Developer Sector No. Type (MW) Ind. Barath power 2 Ind Barath Energy Pvt. Ltd. TPP U1,2 Orissa P Coal 700 (Utkal) Ltd. 3 Lanco Babandh Dhenkanal TPP U 1 Orissa Lanco Babandh P Coal 660 K.V.K. Nilachal 4 K.V.K. Nilanchal TPP U 1 Orissa P Coal 350 Power Pvt. Ltd. 5 Kamalanga TPP U 1-3 Orissa GMR Energy P Coal 1050 6 Sterlite TPP U 4 Orissa Sterlite Energy P Coal 600 SUB TOTAL (ORISSA) 3960 1 Talwandi Sabo TPP U1-3 Punjab Vedanta P Coal 1980 2 Goindwal Sahib TPP U1,2 Punjab GVK Industries P Coal 540 L&T Power 3 Nabha TPP U-1,2 Punjab P Coal 1400 Development Ltd SUB TOTAL (PUNJAB) 3920 1 RAPP U 7 & 8 Rajasthan NPC C Nuclear 1400 2 Kalisindh TPP U1 Rajasthan RRVUNL S Coal 600 3 Chhabra TPP Ext U3,4 Rajasthan RRVUNL S Coal 500 4 Ramgarh CCGT Rajasthan RRVUNL S Gas 160 Raj West Power 5 Jallipa Kapurdi TPP U 5-6 Rajasthan P Lignite 270 Ltd SUB TOTAL (RAJASTHAN) 2930 Gati Infrastructure 1 Bhasmey HEP Sikkim P Hydro 51 Ltd. 2 Jorethang Loop HEP Sikkim DANS Pvt. Ltd P Hydro 96 Jal Power Corp. 3 Rangit-IV HEP Sikkim P Hydro 120 Ltd. Lanco Energy Pvt. 4 Teesta-VI HEP Sikkim P Hydro 500 Ltd. 5 Teesta-III HEP Sikkim Teesta Urja Ltd P Hydro 1200 Gati Infrastructure 6 Chujachen HEP Sikkim P Hydro 99 Ltd. SUB TOTAL (SIKKIM) 2066 1 Kudankulam U 1,2 TN NPC C Nuclear 2000 2 PFBR(Kalpakkam) TN NPC C Nuclear 500 3 Vallur (Ennore) TPP U 2,3 TN NTPC/TNEB JV C Coal 1000 4 Tuticorin TPP JV U1,2 TN NPTL (NLC JV) C Coal 1000 5 Neyveli II TPP U2 TN NLC C Lignite 250 6 Bhawani Barrage HEP II & III TN TNEB S Hydro 60 7 Mettur TPP EXT U1 TN TNEB S Coal 600 8 North Chennai TPP Ext U1,2 TN TNEB S Coal 1200 Ind Barath Power 9 Ind Barath TPP U1 TN P Coal 660 (Madras) Ltd SUB TOTAL (TN) 7270394 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Sl. Fuel Capacity Project Name State Developer Sector No. Type (MW) 1 Tripura CCGT Tripura ONGC JV C Gas 726.6 2 Monarchak CCGT Tripura NEEPCO C Gas 101 SUB TOTAL (TRIPURA) 827.6 1 Rihand TPP-III U 5,6 UP NTPC C Coal 1000 2 Anpara-D TPP U 1,2 UP UPRVUNL S Coal 1000 3 Parichha TPP EXT U-5,6 UP UPRVUNL S Coal 500 4 Harduaganj TPP EXT U-9 UP UPRVUNL S Coal 250 Prayagraj Power 5 Bara TPP U1-3 UP Gen. Co. Ltd P Coal 1980 (Jaypee Group) SUB TOTAL (UP) 4730 1 Tapovan Vishnugad HEP Uttarakhand NTPC C Hydro 520 L&T Uttaranchal 2 Singoli Bhatwari HEP Uttarakhand P Hydro 99 Hydro Power Ltd Lanco Energy Pvt. 3 Phata Byung HEP Uttarakhand P Hydro 76 Ltd. 4 Srinagar HEP Uttara-khand AHPCo. Ltd. P Hydro 330 SUB TOTAL (UTTARAKHAND) 1025 1 Teesta Low Dam-III HEP WB NHPC C Hydro 132 2 Teesta Low Dam-IV HEP WB NHPC C Hydro 160 3 Raghunathpur TPP U1,2 WB DVC C Coal 1200 4 Haldia TPP U1-2 WB CESC P Coal 600 SUB TOTAL (WB) 2092 TOTAL 88537 C: CENTRAL SECTOR; S: STATE SECTOR; P: PRIVATE SECTOR¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 395 Annexure 6.2 SUMMARY OF ADDITIONAL UNDER CONSTRUCTION PROJECTS WHICH MAY YIELD BENEFIT DURING 12th PLAN THERMAL BREAKUP TOTAL HYDRO NUCLEAR TOTAL COAL LIGNITE GAS/LNG THERMAL CENTRAL 2000 500 0 0.0 500 0 2500 SECTOR STATE 80 4520 0 0.0 4520 0 4600 SECTOR PRIVATE 355 28080 770 0.0 28850 0 29205 SECTOR ALL-INDIA 2435 33100 770 0.0 33870 0 36305 BLOCK IMP WASHERY LINKAGE CIL BLOCK TOTAL (TL) COAL REJECT REQUIRED COAL BASED 4250 16250 660 11880 60 0 33100 CAPACITY S. Fuel Capacity Project Name State Developer Sector No. Type (MW) 1 Kakatiya TPP ST -II U1 A.P. APGENCO S Coal 600 Simhapuri Energy Pvt. 2 Simhapuri TPP Ph-I, U3,4 A.P. P Coal 300 Ltd., SUB TOTAL (AP) 900 1 Subansiri (L) HEP Ar. Pr. NHPC C Hydro 1000 SUB TOTAL (Ar. Pr.) 1000 KSK Mahanadi Power 1 Akaltara TPP U-4-6 Chhattisgarh P Coal 1800 Company Limited 2 Raikheda TPP U-1,2 Chhattisgarh GMR Energy P Coal 1370 R.K.M. Powergen Pvt 3 Uchpinda TPP U4 Chhattisgarh P Coal 360 Ltd, Athena Chhattisgarh 4 Athena Singhtarai TPP U-2 Chhattisgarh P Coal 600 Power Ltd. 5 Vinjkote (Darrampura) TPP U4 Chhattisgarh SKS Ispat and Power Ltd. P Coal 300 6 VISA TPP Chhattisgarh VISA Power P Coal 600 7 Raigarh TPP U3,4 Chhattisgarh Jindal Power Ltd P Coal 1200 SUB TOTAL (Chhhattisgarh) 6230 1 Sikka TPP U-4 Gujarat GSECL S Coal 250 The Tata Power Company 2 Mundra UMPP, U -3,4,5 Gujarat P Coal 2400 Ltd 3 Bhavnagar Lignite U-1,2 Gujarat Bhavnagar Energy P Lignite 500 SUB TOTAL (Gujarat) 3150 1 Essar Tori TPP U-1,2 Jharkhand Essar Power P Coal 1200 JAS Infrastructure & 2 JAS Infra TPP Jharkhand P Coal 660 Power Pvt Ltd 3 Corporate Power TPP PH-II Jharkhand Corporate Power Ltd P Coal 540 SUB TOTAL (Jharkhand) 2400 1 Chandrapur TPP U-9 Maharashtra MAHGENCO S Coal 500 2 Koradi TPP U-9,10 Maharashtra MAHGENCO S Coal 1320396 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] S. Fuel Capacity Project Name State Developer Sector No. Type (MW) Water Recources Deptt 3 Koyna Left Bank PSS Maharashtra (Government of S Hydro 80 Maharashtra) India Bulls- Amravati TPP Ph- India Bulls Realtech 4 Maharashtra P Coal 1350 II,U1-5 Limited India Bulls - Nasik TPP Ph- India Bulls Realtech 5 Maharashtra P Coal 1350 II,U1-5 Limited 6 Tiroda TPP PH-II U 2,3 Maharashtra Adani Power Ltd P Coal 1320 SUB TOTAL (Maharashtra) 5920 1 Vindhyachal STPP St-V U-13 MP NTPC C Coal 500 2 Mahan TPP U-1,2 MP Essar Power P Coal 1200 3 Sasan UMPP U3-6 MP Reliance Power Ltd. P Coal 2640 4 Nigrie TPP U-1,2 MP Jaypee Group P Coal 1320 SUB TOTAL (MP) 5660 Jindal India Thermal 1 Derang TPP U2 Orissa P Coal 600 Power Ltd 2 Monnet malibrahmani U1,2 Orissa Monnet P Coal 1050 K.V.K. Nilachal Power 3 K.V.K. Nilachal TPP U 2,3 Orissa P Coal 700 Pvt. Ltd. Maadurga Thermal Power 4 Maa Durga TPP Orissa P Coal 60 Co Ltd Lanco Babandh - Dhenkanal 5 Orissa Lanco Babandh P Coal 660 TPP U-2 SUB TOTAL (Orissa) 3070 1 Kawai TPP Rajasthan Adani Power Ltd P Coal 1320 2 Jalipa Lignite U 7-8 Rajasthan Raj West Power Ltd P Lignite 270 3 Kalisindh TPS U2 Rajasthan RRVUNL S Coal 600 SUB TOTAL (Rajsthan) 2190 1 Tashiding HEP Sikkim Shiga Energy P Hydro 97 2 Dikchu HEP Sikkim Sneha Kinetic Power P Hydro 96 3 Rangit-II HEP Sikkim Sikkim Hydro Power P Hydro 66 Madhya Bharat Power 4 Rongnichu HEP Sikkim P Hydro 96 Corp. Ltd SUB TOTAL (Sikkim) 355 Mutiara TPP, Tuticorin, 1 TN Coastal Energen Pvt Ltd P Coal 1200 Melamaruthur U1-2 SUB TOTAL (TN) 1200 1 Bajaj Energy TPP (Lalitpur) UP Bajaj Energy Pvt Ltd. P Coal 1980 SUB TOTAL (UP) 1980 1 Tehri PSP Uttarakhand THDC C Hydro 1000 SUB TOTAL (Uttarakhand) 1000 1 DPL TPP U 8 WB Durgapur Projects Ltd S Coal 250 2 Sagardighi TPP U1,2 WB WBPDCL S Coal 1000 SUB TOTAL (WB) 1250 TOTAL 36305¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 397 Annexure 6.3 LIST OF PROJECTS PROPOSED UNDER BULK TENDERING S. Unit X Fuel Total Capacity Project Name State Developer Sector No. Capacity(MW) Type (MW) 1 New Nabinagar TPP 3x660 Bihar NTPC JV C Coal 1980 2 Lara TPP 2x800 Chhattisgarh NTPC C Coal 1600 3 Kudgi TPP 3x800 Karnataka NTPC C Coal 2400 4 Solapur TPP 2x660 Maharashtra NTPC C Coal 1320 5 Mauda Ph-II TPP 2x660 Maharashtra NTPC C Coal 1320 6 Gajmara TPP 2x800 Orissa NTPC C Coal 1600 7 Darlipali TPP 2x800 Orissa NTPC C Coal 1600 8 Meja JV TPP 2x660 UP NTPC JV C Coal 1320 9 Raghunathpur TPP 2x660 WB DVC C Coal 1320 Total 14460 Annexure 6.4 PROJECTS FOR WHICH ORDERS FOR MAIN PLANT PLACED BUT CERTAIN CLEARANCE AWAITED Fuel Sr.N. Project State Developer Sector Capacity type 1 Krishnapatnam UMPP U1-6 A.P. Reliance Power Ltd. P Coal 3960 2 Baurauni TPP Bihar BSEB S Coal 500 Raigarh TPP 3 Chhattisgarh Visa Power P Coal 1260 (600MW+660MW) Korba West Power Company 4 Avantha Bhandar TPP U-2 Chhattisgarh P Coal 600 Ltd. 5 Pipavav TPP Gujarat Pipavav Energy Ltd P Coal 600 6 Yermarus TPP Karnataka RPCL (JV of KPCL & BHEL) S Coal 1600 7 Edlapur TPP Karnataka RPCL (JV of KPCL & BHEL) S Coal 800 8 Bellary TPP U-3 Karnataka KPCL S Coal 700 9 DB Power TPP (Sidhi) U-2 MP DB Power P Coal 660 Navabharat Power Pvt.Ltd 10 Orissa Navabharat Power Pvt.Ltd P Coal 1050 TPP U1-3 Sangam Power Generation 11 Karchana TPP UP P Coal 1320 Company Ltd (JP Group) Total 13050398 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Annexure 6.5 PROJECTS FOR WHICH COAL TIED-UP BUT ORDERS FOR MAIN PLANT NOT PLACED S. Fuel Capacity Project Name State Sector No. Type (MW) 1 BPL POWER PROJECTS (AP) LTD A.P. P Coal 600 2 TPP OF M/s VIDEOCON INDUSTRIES LTD. Chhattisgarh P Coal 660 3 DHEERU POWER GEN PVT. LTD. Chhattisgarh P Coal 1050 4 PEL POWER LTD. AMRELI Gujarat P Coal 500 5 TILAIYA UMPP BY RELIANCE POWER LTD. Jharkhand P Coal 3960 6 APARNA INFRAENERGY Maharashtra P Coal 250 JINBHUVISG POWER GENERATION LTD 7 Maharashtra P Coal 500 2X250 8 CENTRAL INDIA POWER CO. LTD Maharashtra P Coal 660 9 GUPTA ENERGY LTD. Maharashtra P Coal 540 10 NSL POWER PVT. LTD TN P Coal 1320 11 TIRUMALAI TPP PEL POWER LTD. TN P Coal 500 12 OBRA EXTN U-1 (UPRVUNL) UP S Coal 660 TOTAL 11200 Annexure 6.6 SHELF OF GAS BASED POWER PROJECTS UNDER CONSTRUCTION (GAS NOT TIED UP) S.No. Name of Power Station /Agency Capacity(MW) Located in State Central Sector STATE SECTOR 1 Bawana CCGT * 750 Delhi 2 Dhuvran Extn (GSECL) 375 Gujarat 3 Pipavav JV CCGT 702 Gujarat Sub Total (S.S.) 1827 Private Sector 4 Vemagiri exp by GREL 768 A.P. 5 Lanco Kondapalli Exp (St-III) 770 A.P. 6 Kashipur CCGT (Sravanti Energy P Ltd) I&II 450 Uttarakhand 7 Samalkot Expansion 2400 A.P. 8 Gegrupadu Exp. (St-III)I 400 A.P. 9 Gautami St-II (Phase-I) 800 A.P. 10 CCGT by M/s PSPL(Pandu Ranga) –Ph-I 110 A.P. 11 RVK (Rajahmundry) Private Ltd. 436 A.P. 12 Sugen Phase-I Unit -4 M/s Torrent 382.5 Gujarat 13 Dahej SEZ (Torrent) 3 Modules 1200 Gujarat 14 CCGT by M/s Beta Infratech Private Ltd 225 Uttarakhand¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 399 15 CCGT by M/s Gama Infratech Pvt Ltd 225 Uttarakhand 16 CCPP by M/s Guruji Power Pvt Ltd (GPPL) 110 Uttarakhand 17 CHP at Bidar by Saheli Exports Pvt. Ltd. 70 Karnataka 18 CCGT at Kuttalam by Saheli Exports P Ltd. 30 Tamilnadu 19 Latur CCPP by Hecate Power Systems P Ltd. 800 Maharashtra 20 CCPP by M/s H Energy Co. Pvt. Ltd. 350 Maharashtra 21 CCGT by M/s KPR Chemicals Ltd. 225 AP 22 CCGT by M/s Pioneer Gas Power Ltd 400 Maharashtra 23 PPN Expansion by PPN Power Generation Co Ltd 1080 Tamil Nadu 24 Gas Engine at Pashamylaram By Astha Power 35 AP Sub Total (Pvt Sector) 11266.5 TOTAL (SS+PS) 13093.5 Total capacity of Bawana CCGT is 1500 MW, out of it 750 MW was commissioned during 11th Plan. Annexure 6.7 LIST OF POWER PROJECTS REQUESTED FOR INCLUSION IN THE 12th PLAN S. Fuel Capacity Project Name State Developer Sector No. Type (MW) 1 AGTP Tripura Neepco C Gas 46 2 Jangir Champa TPP Chhattisgarh MB Power P coal 1320 DR TPP Ext. 3 Haryana HPGCL S Coal 660 (Yamuna Nagar) Spic Electric Power 4 Tuticorin St-IV TN P Coal 525 Corporation Pvt. Ltd 5 Srikaji TPP TN Sindia Power P Coal 1320 6 Bhognipur TPP UP Lanco P Coal 3960 7 Sandila TPP UP Torrent Power P Coal 1320 UPRVUNL & NLC 8 Ghatampur TPP UP S Coal 1980 JV 9 Jawaharpur TPP UP UPRVUNL S Coal 1980 Total 13111400 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Annexure 6.8 LIST OF HYDRO PROJECTS IDENTIFIED FOR LIKELY BENEFITS DURING 13TH PLAN Sl. Name of scheme State Sector Developer Capacity (MW) No. 1 Dummugudem A.P. S APID 320 2 Pollavaram MPP A.P. S APID 960 3 Singareddypally A.P. S APID 320 4 Tawang-I Ar. Pr C NHPC 600 5 Tawang-II Ar. Pr C NHPC 800 6 Demwe Lower Ar. Pr P Athena Demwe 1750 KSK Dibbin Hydro Power 7 Dibbin Ar. Pr P 120 Pvt. Ltd. 8 Siang Lower Ar. Pr P Jaiprakash Associates Ltd. 2700 9 Nyamjunchhu Ar. Pr P Bhilwara Energy Ltd 780 10 Londa(Talong) Ar. Pr P GMR Energy Ltd. 225 11 Nafra Ar. Pr P SEW 120 12 Tato-II Ar. Pr P Reliance Enegy Ltd. 700 13 Dardu Ar. Pr P KVK 60 14 Mago Chhu Ar. Pr P SEW 96 15 Par Ar. Pr P KVK 65 16 Rego Ar. Pr P TUFF Energy 141 17 Dinchang Ar. Pr P KSK 90 18 Nyukcha Rong Chhu Ar. Pr P SEW 96 19 Lower Kopili Assam S Assam GENCO 150 20 Dhaula Sidh H.P. C SJVNL 66 21 Bajoli Holi H.P. P GMR 180 22 Kutehr H.P. P JSW 240 23 Dhamwari Sunda H.P. P Dhamwari Power Pvt Ltd 70 24 Kashang -IV H.P. S HPPCL 48 25 Renuka Dam H.P. S HPPCL 40 26 Shongtong Karcham H.P. S HPPCL 450 27 Kawar J & K C NHPC 520 28 Kiru J & K C NHPC 600 29 New Ganderbal J & K S JKPDC 93 30 Gundia-I Karnataka S KPCL 200 31 Gundia-II Karnataka S KPCL 200 Shiva Samudram 32 Karnataka S KPCL 345 Seasonal HEP 33 Athirapally Kerala S KSEB 163 34 Mankulam Kerala S KSEB 40 35 Achenkovil Kerala S KSEB 30 36 Pambar Kerala S KSEB 40 37 Loktak D/S Manipur C NHPC 66 38 Balimela Dam Toe Orissa S Orissa & AP JV 60 39 UBDC-III Punjab P Bhilwara Energy Ltd. 75 40 Shahpur Kandi Punjab S PSEB 206 41 Teesta -IV Sikkim C NHPC 520 42 Ting Ting Sikkim P TT Energy 99 43 Panan Sikkim P Himagiri 300 44 Kundah PSS Tamil Nadu S TNEB 500 45 Lata Tapovan Uttarakhand C NTPC 171 46 Vishnugad Pipalkoti Uttarakhand C THDC 444 47 Kotlibhel-IA Uttarakhand C NHPC 195 48 Kotlibhel-IB Uttarakhand C NHPC 320¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 401 Sl. Name of scheme State Sector Developer Capacity (MW) No. 49 Kotlibhel-II Uttarakhand C NHPC 530 Rupsiyabagar 50 Uttarakhand C NTPC 260 Khasiyabara Naitwar Mori (Dewra 51 Uttarakhand C SJVNL 56 Mori) 52 Devsari Dam Uttarakhand C SJVNL 252 Alaknanda 53 Uttarakhand P GMR 300 (Badrinath) 54 Hanol Tiuni Uttarakhand P Sunflag 60 55 Bogudiyar Sirkari Uttarakhand P GVK 146 56 Mapang Bogudiyar Uttarakhand P GVK 200 57 Pala Maneri Uttarakhand S UID 480 58 Arkot Tiuni Uttarakhand S UID 81 59 Tuini Plasu Uttarakhand S UID 72 60 Bowala Nand Prayag Uttarakhand S UJVNL 300 61 Nand Prayag Langasu Uttarakhand S UJVNL 100 62 Tamak Lata Uttarakhand S UJVNL 280 63 Ramam -III W. B. C NTPC 120 64 Ramam -I W. B. S WBPDCL 36 Ramman Ultimate- 65 W. B. S WBPDCL 28 (IV) Total 19675402 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Chapter 7 OPTIMIZATION OF LAND AND WATER REQUIREMENTS FOR THERMAL POWER PLANTS 7.0 INTRODUCTION Large capacity addition is envisaged in the country during the 12th Plan and beyond. A capacity of about 88,000 MW is required during 12th Plan and a capacity of similar magnitude during 13th Plan is to be added. This requires installation of large number of coal and gas based plants. To achieve faster capacity addition targets, large capacity plants including 4,000 MW size Ultra Mega power plants(UMPPs) using 660/800 MW supercritical units have been envisaged for installation at different sites mainly at pithead and coastal locations. Availability of adequate land and water are key requirements for installation of a thermal power plant. In the past, because of comparatively slow pace of capacity addition, availability of adequate land was not a big constraint and plants could be located as per other applicable criteria viz. availability of coal and water. However, since expansion of power sector has been taken up in a big way, availability of land has become a constraint and is posing a big challenge for currently planned and future plants. Land has become premium resource and its acquisition has also become difficult on account of other competing sectors and opposition of local population. In this background, optimum utilisation of land has gained significance so that maximum plant capacity could be installed on the available land. 7.1 LAND REQUIREMENT Land requirement for a coal based plant depends upon a number of factors such as capacity of the plant & unit size adopted, quality of coal & its storage requirement, type of CW system adopted, source of raw water & its storage requirement and plant design aspects. For coal based plants, land is basically required for main plant systems/ equipment, ash dyke, pipe corridors (for ash and raw water) and township. Plants based on imported coal require less land as compared to those based on indigenous coal on account of considerably reduced requirement for ESP, coal handling system, ash handling system and ash dyke. Type of CW system viz. open cycle or cooling tower system also has a significant impact on land requirement of the plant. Land requirement for ash dyke varies over wide range depending upon quality of coal, method of ash disposal and utilization of fly ash. Fly ash and bottom ash were earlier conventionally disposed off to ash pond in the form of lean slurry requiring large pond area. However, with increased concentration of wet slurry up to 25% and use of other techniques such as HCSD (High concentration slurry disposal) and dry fly ash disposal, the land required for ash dyke has considerably reduced. MOEF’s stipulation for progressive utilization of fly ash up to 100% within a given time frame has reduced the quantum of ash to be disposed off to ash dyke. Use of washed coal and blending of imported coal with indigenous coal has also resulted in reduced land required for ash dyke. New plants based on imported coal would be requiring least land for ash dyke. 7.1.1 Committee for Optimisation of Land Requirement In view of large capacity addition proposed to be based on coal based plants, need had been felt to optimize the land requirement for thermal plants. As large capacity plants with large size units are required to be installed to achieve the intended high capacity targets, CEA had set up a committee in April, 2007 to go into the aspect of land requirement for thermal plants and suggest minimum land requirement for various size plants. The Committee submitted its report in December, 2007 and has analysed land requirement aspects for various sizes & combinations of the plants viz. indigenous coal/imported coal, open cycle/closed cycle CW system. The Committee has recommended the land requirement as indicated in Table 7.1 & 7.2 below:¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 403 Table 7.1 Indigenous Coal (Pithead Stations) Sl. Description Land requirement ( acres) N. (acre/MW) 2x500MW 3x660MW 6x660MW 5x800MW i) Main power plant 600 850 1250 1170 (0.6) (0.43) (0.32) (0.29) ii) Ash dyke 500 855 1630 1200 iii) Other facilities (pipe corridors & raw 220 245 250 250 water pump house etc.) iv) Township 100 100 150 150 Total land requirement (acres) 1420 2050 3280 2770 (acres/MW) (1.42) (1.04) (0.83) (0.69) Table 7.2 Imported Coal (Coastal Stations) Sl. Description Land requirement ( acres) N. (acre/MW) 3x660MW 6x660MW 5x800MW Without With Without With Without With MGR & MGR & MGR & MGR & MGR & MGR & without with without with without with cooling cooling cooling cooling cooling cooling tower tower tower tower tower tower i) Main power plant 400 570 630 880 570 840 (0.2) (0.29) (0.16) (0.22) (0.14) (0.21) ii) Ash dyke 240 240 400 400 390 390 iii) Other facilities 100 140 110 150 110 150 (pipe corridors & raw water pump house etc.) iv) Township 100 100 150 150 150 150 Total land 840 1050 1290 1580 1220 1530 requirement (acres) (acres/MW) (0.42) (0.53) (0.33) (0.4) (0.3) (0.38)404 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] The Committee has suggested that further reduction in land requirement is possible for ash dyke and the colony. The land requirement could also be reduced considerably by setting up of integrated projects for fly ash utilization, compact design of the plant and adopting multi storey concept of the township. 7.2 WATER OPTIMIZATION TECHNOLOGIES IN THERMAL POWER PLANTS 7.2.1 Introduction Water is one of the key inputs for thermal power generation. Historically, thermal power plants were located near water bodies and adequate quantity of water was assured on sustained basis. With all round development in the country and vast growth of thermal power stations, the availability of water has become scarce. As drinking and irrigation uses have got priority in allocation of water over industrial use and power generation, the thermal power plants are facing constraints in availability of adequate fresh water. Judicious utilization of water and recycling of plant waste water in thermal plants has become important so as to reduce net drawal from the source water body to bare minimum. Large coal based capacity is required to be added during 12th Plan and beyond. This requires large number of new sites for setting up coal based power stations. Primary criteria for deciding selection of sites is availability of land and water. Much of the new capacity is envisaged near pit-head due to economics of coal transportation and in coastal regions. Difficulties are already being faced in selection of new sites due to non-availability of water, particularly in coal bearing states like Orissa, Jharkhand and Chhatisgarh where large number of sites have been identified. Difficulties are also being faced in finding coastal sites particularly on west coast. This problem is expected to be aggravated in future when more sites would be required. Thus there is a need to minimise water requirement in water scarce regions to enhance the siting options for thermal power plants. 7.2.2 Plant Water System The plant water system including cooling water system depends upon source of raw water. Cooling water system may be of once through open cycle type or closed cycle open recirculating type using cooling tower. For all inland plants based on fresh water sources such as river, canal, lake, and reservoir, it is now mandatory to install closed cycle cooling system employing cooling towers. Open cycle cooling system is permitted only in coastal regions. Sea water based cooling towers are also adopted at coastal sites depending upon techno-economic considerations. The raw water input to the plant needs to be treated to make it suitable for use in various plant applications. Typically, raw water is treated in clarification plant to produce clarified water which is used for clarified water applications such as cooling tower make up & service water etc. and as input water for DM plant & potable water system. The scheme of DM plant typically consist of pressure filters, cation exchanger, degasser, anion exchanger and mixed bed polisher. The scheme of potable water system consist of filtration, chlorine dosing and any other treatment as required to make water fit for drinking. The waste water generated in various treatment sections (clarifier sludge, filter back wash and regeneration waste of DM plant etc.) is suitably recycled and reused with or without treatment to the extent possible. 7.2.3 Water Requirement In a thermal power plant, bulk of the water is required for make up to the condenser cooling water system and for wet ash disposal. Other water requirements include power cycle make up, service and potable uses, coal dust suppression etc. The cooling tower blow down is used for disposal of ash. Plant water requirement is governed by a number of factors such as quality of raw water, type of condenser cooling system, quality of coal, type of ash disposal system, waste water management aspects. Consumptive water requirement for a typical 1000MW capacity plant with different modes of ash handling system is indicated in Table 7.3 below:¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 405 Table 7.3 Sl. Type of ash handling system COC** of Plant water consumption No. Fly ash Bottom ash CW system (m3/h) 1 Normal mode – Dry Wet 5.0 2900* Emergency – Wet 2 Normal mode– Dry Wet 5.0 2850 Emergency – HCSD*** Note: * During initial period of plant operation till adequate utilization of fly ash is achieved, wet mode shall be used for disposal of fly ash and additional requirement of water during this period shall be about 600 m3/h over that indicated above. ** Cycle of Concentration *** High Concentration Slurry Disposal The requirement of plant consumptive water can further be reduced by adopting technologies which facilitate in minimizing requirement of water. 7.2.4 Plant Water Optimization Technologies There has been continued endeavour for optimization of plant water system in thermal power plants on account of water scarcity and reducing allocation of water for thermal generation. Over a period of time in the past, plant water requirement has been optimized by judicious utilization of water for various applications, adequate treatment for deteriorating of quality of raw water, adoption of reduced margins in various consumptive uses and use of plant waste waters in various low grade applications. Further optimization in plant water requirement has been achieved by adopting techniques aimed at reducing consumptive requirement of various applications and recycling of plant waste waters to maximum extent. The requirement and scheme for utilization of plant waste water is also governed by stipulation of MOEF and CPCB/ SPCB in this regard. In some recent projects, MOEF has stipulated the requirement of zero effluent discharge from plant boundary which has a great bearing on plant water scheme and treatment of waste water to be adopted. Technologies/measures that can be adopted for optimization of the water required for thermal plants are described below: 7.2.4.1 Cooling Water System Cooling water system is provided to remove the waste heat in condenser and plate heat exchangers of boiler and turbine auxiliaries. Cooling towers involve evaporation of water and require blow down to limit the build up of dissolved salts in the circulating water. Make up water is added to cooling water system to compensate for loss of water due to evaporation, drift and blow down. Dry cooling systems which do not involve evaporation of water, thus not requiring any make up water for condenser cooling system can also be used for reduction of plant consumptive water to a large extent. 7.2.4.2 Optimisation in wet cooling system Wet cooling towers require make up water, the quantum of which depends upon cycle of concentration (COC) that can be maintained in the CW system. The COC to be adopted in the CW system primarily depends upon quality of make up water. Present practice is to use clarified water as make up to the cooling tower and operate the CW system at COC of 5.0 with suitable chemical dosing so as to optimize the plant water requirement. This requires CT make up water of typically 2 % of CW flow, and blow down water to be effected from CW system amounts to 0.35 % of the CW flow. The water for ash handling plant is tapped from available blow down water. In case, requirement of ash handling plant is less than available blow down water from CW system, the balance blow down is led to the CMB of the plant. If water requirement of ash handling plant gets further reduced viz. by adoption of dry ash handling, recycling of ash pond water etc., there shall be increase in blow down water to be disposed off to the CMB. The quantum of blow down water can be reduced by increasing the COC of CW system which can be achieved by suitably improving the chemical regime of circulating water.406 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 7.2.4.3 Dry cooling system Dry cooling systems refer to rejection of power cycle waste heat directly to the atmosphere by cooling in finned tubes by air. Unlike wet cooling systems which operate with respect to ambient wet bulb temperature and involve both sensible and latent heat transfer, dry cooling systems operate with respect to ambient dry bulb temperature and involve only sensible cooling. Large surface area of finned tubes is required for heat exchange in dry cooling system. The turbine back pressure achievable in dry cooling system is considerably higher than in wet cooling system on account low heat transfer coefficient and operation with respect to dry bulb temperature. Dry cooling systems can be broadly classified in following two categories:- a) Direct dry cooling systems b) Indirect dry cooling systems. In direct dry cooling system, steam exhaust from LP turbine is directly cooled in a system of finned tubes by ambient air using mechanical draft fans. To reduce pressure drop in steam conveying system, these units called air cooled condenser (ACC) need to be installed close to the turbine hall. The finned tubes are generally arranged in the form of an ‘A’ frame or delta over forced draft fans to reduce the land area requirement. In an indirect dry cooling system, turbine exhaust steam is cooled by water in a condenser which can be of surface type or direct contact type and hot water is cooled by air in finned tube bundles utilizing natural draft tower. Because of water piping involved, these air cooled units can be located away from the main plant. Heat exchanger elements are vertically arranged at base of the tower along its periphery with cooling taking place by air drawn by buoyancy of hot air inside the tower shell. Dry cooling technologies have higher equipment cost and result in reduced power output of the unit due to high condenser back pressure leading to high turbine cycle heat rate. However, these technologies provide an option of locating the thermal plants in water scarce regions. There are considerable number of dry cooling installations including for large size units (≥ 600 MW) operating in different parts of the world. In India, some small size combined cycle plants, captive power plants and industrial units have also provided with air cooled condensers. In order to explore the possibility of reducing the plant consumptive water requirement by application of dry cooling system for condenser cooling in thermal power plants, CEA, has set up a committee with members drawn from NTPC, BHEL, RRVUNL, MAHAGENCO, CESC and TCE to examine the issue of dry cooling system for condensers in thermal power plants. The committee is expected to suggest available options of dry cooling systems for thermal power plants keeping in view various techno- economic aspects involved. 7.2.5 Ash Handling System Various technologies/measures that can be adopted for minimizing the requirement of water for ash handling system are described below: 7.2.5.1 Recovery and reuse of ash water Thermal power plants have conventionally been provided with wet ash disposal system. Fly ash and bottom ash is discharged to low lying ash pond in the form of a lean slurry. As per requirement of MOEF, ash pond water is to recovered and reused in ash handling system to conserve the water. Typically, 70% water can be recovered from the ash pond and reused in ash handling plant. Thus, requirement of water to be supplied to the ash handling plant from plant water system gets reduced to this extent. 7.2.5.2 Dry ash disposal Wet ash disposal results in contamination of ground water on account of seepage from ash pond, and areas surrounding the pond are under threat for possible breach of ash bund. Dry ash disposal overcomes these issues besides reduction in consumptive water and facilitates utilization of fly ash in cement plants, building material, landfill, embankments etc. With progressive increase in utilization in fly ash, the wet disposal of ash is getting reduced. The plant water is required only for wet disposal of bottom ash which is about 20% of total ash generation and part of fly ash which is not disposed off in dry form. 7.2.5.3 Dry bottom ash handling Bottom ash is conventionally handled in water impounded hoppers and then grinded in clinker grinders for subsequent disposal to ash pond alongwith fly ash in the form of lean slurry. Semi-dry method using hydro- bins have also been used in some of the power plants. To conserve water, bottom ash can be disposed in dry form also. Technologies are¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 407 available for dry extraction, cooling and conveying of bottom ash from pulverized coal fired boilers. In India, this technology is being used in one thermal power plant with unit size of 300 MW. 7.2.5.4 High concentration slurry disposal (HCSD) system As the name suggests, HCSD refers to disposal of fly ash from coal fired thermal power plant to ash disposal area in the form of high concentration slurry. The process is environmental friendly and involves pumping of high solids concentration slurry with more than 60% solids by weight employing positive displacement pumps as compared to lean slurry transportation at about 20% concentration. The slurry forms a natural slope on the disposal area without need for mechanical spreading and with minimal release of water and generates a stable and dry landfill. The water consumption of HCSD system is lower by a factor of about 6 as compared to water requirement by lean slurry disposal. However, if recovery of water from ash pond is taken into consideration, there may not be very substantial saving in water consumption as compared to wet disposal method. 7.2.6 Minimising Effluent Discharge Waste waters generated in a typical thermal power plant include clarifier sludge, filter back wash, CT blow down, boiler blow down, regeneration waste of DM plant & condensate polishing plant etc. An optimized plant water scheme requires that sludge water and filter back wash water are recycled to pre treatment plant and other waste waters are utilized to maximum extent in low grade applications. The unutilized waste has high TDS on account of CT blow down and regeneration waste. If water is to be recovered from this waste water for recycling in the plant, its treatment would require application of reverse osmosis technology to have maximum recovery of water and minimum quantity of concentrated brine reject. 7.3 WATER SAVING As can be seen from above that various possibilities exist for reduction of plant water consumption which need to be applied on case to case basis. For plants with wet cooling towers, water reduction can typically be achieved in an optimum manner by operating the CW system at a practically possible higher COC, recycling of clarifier sludge water & filter back wash in pre treatment plant, reduced consumption in ash handling plant and maximum utilization of waste water. These measures can result in plant water saving of about 20%. If dry cooling system is adopted in combination with dry handling of ash, plant water consumption can be reduced by about 80- 85%. ----+++----408 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Chapter 8 LOW CARBON GROWTH STRATEGY FOR INDIAN POWER SECTOR FOR 12th & 13th FIVE YEAR PLANS 8.0 INTRODUCTION Power is one of the most essential infrastructural requirements for the overall development of the country’s economy. All the industries are heavily dependent for their successful operation on the availability of reliable and quality power at reasonable rates. The commercial and domestic power requirements of the county are also increasing rapidly. Therefore, making available power on demand to all is one of the top most priorities of the Government. Making power available to the consumers, be it industries, enterprise, domestic consumers or farmers for their use, involves an overall development of the entire chain from power generation to its transmission and ultimately its distribution to the point of consumption in the most optimum and efficient manner. The demand for power has been continually outstripping the growth of generation and therefore peak and energy shortages still prevail in the country either due to inadequate generation or inadequate transmission & distribution facilities despite the fact that generation capacity has increased many fold since independence. The demand for electricity in the country has been growing at an average growth rate of about 7 to 8% and demand-supply gap has widened over the years. Providing reliable and inexpensive electricity is the goal for economic development of the country and better standard of living of the people. Besides its importance in the growth of the country’s economy, it plays a major role in the life of a common man and has a direct impact on the quality of life. About 56.5% of our rural households still do not have access to electricity and therefore the national common minimum programme of our government has set a target of completing electrification of all households in coming five years. While we have to enhance availability of energy to meet our growing demand, as a responsible nation India has decided to adopt a Low Carbon Growth Strategy to reduce the energy intensity and promote sustainable development of the country. Sustainable development is one that meets the needs of the present without compromising on the ability of the future generations to meet their own needs. With a view to reduce Green House Gas emission, harnessing of renewable resources to the extent possible, promotion of hydro and nuclear generation, enhancing efficiency of the existing power plants and introduction of new technologies for power generation for enhancing efficiency and demand side management and conservation are being pursued. Since coal will continue to dominate power generation in future, Super Critical Technology has been proposed to be introduced. To produce power this technology will convert coal far more efficiently than pulverized coal boiler technology with Sub-Critical steam parameters. Initiatives have also been taken to undertake feasibility studies towards introduction of Integrated Gasification Combined Cycle (IGCC) technology for power generation. This note details the strategy being adopted by the Indian Power Sector to reduce GHG emissions in line with government’s objectives enshrined in NAPCC. 8.1 INSTALLED CAPACITY AS ON 31-03-2012 The total installed capacity as on 31-03-2012 was 1,99,877 MW comprising of 38,990 MW hydro, 1,31,603 MW thermal (including gas and diesel), 4,780 MW Nuclear and 24,503 MW Renewable Energy sources. The type-wise details of installed capacity as on 31-03-2012 are given in Table 8.1 and shown in Pie Chart 8.1 below.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 409 Table 8.1 Installed Capacity as on 31.03.2012 Sector Hydro (MW) Thermal (MW) Nuclear R.E.S * Total (MW) ( MW) (MW) Coal Gas Diesel Total (MNRE) State 27380 49457.0 4965.32 602.61 55024.93 0 3513.72 85918.65 Private 2525.00 23450.38 6713.50 597.14 30761.02 0 20989.73 54275.75 Central 9085.4 39115.00 6702.23 0 45817.23 4780 0 59682.63 Total 38990.4 112022.38 18381.05 1199.75 131603.18 4780 24503.45 199877.03 • RES – RReenneewwaabbllee EEnneerrggyy SSoouurrcceess • PPrreesseenntt IICC aass oonn 3311..1100..22001122 iiss 22,,0099,,227766 MMWW Chart 8.1 AALLLL IINNDDIIAA IINNSSTTAALLLLEEDD CCAAPPAACCIITTYY ((MMWW))- UUttiilliittiieess (As on31 st March 2012) NEW RENEWABLES, NUCLEAR, 4780, 24503, 12% 2% HYDRO, 38990.4, 20% GAS, 18381.05, CCOOAALL,, 111122002222..44,, DDIIEESSEELL,, 11119999..7755,, 9% Total: 199877 MW 5566%% 1% 8.2 GGEENNEERRAATTIIOONN MMIIXX DDUURRIINNGG 22001111-12 The energy generation during 2011-111222 wwwaaasss 999222999 BBBUUU cccooommmppprrriiisssiiinnnggg 111333666 BBBUUU hhhyyydddrrrooo (((iiinnncccllluuudddiiinnnggg 555...333 BBBUUU iiimmmpppooorrrtttsss fffrrrooommm BBBhhhuuutttaaannn))),,, 777000888BBBUUU ttthhheeerrrmmmaaalll (((iiinnncccllluuudddiiinnnggg gggaaasss aaannnddd dddiiieeessseeelll))),,, 333222 BBBUUU nnnuuucccllleeeaaarrr aaannnddd 555222 BBBUUU eeennneeerrrgggyyy fffrrrooommm RRReeennneeewwwaaabbbllleeesss... TTThhheee generation break-up during 2011-1122 iiss ggiivveenn bbeellooww: Table 8.2 Energy generation during 2011-12 Hydro ( BU) TThheerrmmaall ((BBUU)) Nuclear (BU) RES* (BU) Total (BU) 136 (14.7%) 770088 ((7766..33%%)) 32 (3.4%) 52 (5.6%) 929 (100%)410 THE GGAAZZEETTTTEE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Chart 8.2 GGeenneerraattiioonn dduurriinngg 22001111-12 (BU) NNuucclleeaarr,, 3322,, RES*, 52, 6% HHyyddrroo ,, 113366,, 33%% 15% Thermal, 708, 76% Total: 929 BU IItt mmaayy bbee sseeeenn tthhaatt sshhaarree ooff ffoossssiill ffuueellss iinn iinnssttaalllleedd ccaappaacciittyy iiss 6666%%,, wwhhiillee tthhee sshhaarree ooff tthhee ssaammee iinn eenneerrggyy ggeenneerraattiioonn iiss 777666%%% iiinnndddiiicccaaatttiiinnnggg ttthhhaaattt ttthhheee fffooossssssiiilll fffuuueeelll cccaaapppaaaccciiitttyyy hhhaaasss bbbeeeeeennn ooopppeeerrraaatttiiinnnggg aaattt aaa hhhiiiggghhheeerrr PPPLLLFFF ttthhhuuusss gggeeennneeerrraaatttiiinnnggg mmmooorrreee... FFFooossssssiiilll fffuuueeelllsss bbbaaassseeeddd ggeenneerraattiioonn,, aass ssuucchh iiss tthhee bbaacckk bboonnee ooff IInnddiiaann PPoowweerr SSeeccttoorr.. 8.3 CAPACIITTYY AADDDDIITTIIOONN DDUURRIINNGG 1111TH PLAN During the 11th Plan period (2007- 22001122)),, PPllaannnniinngg CCoommmmiissssiioonn hhaadd sseett aa ccaappaacciittyy aaddddiittiioonn ttaarrggeett ooff 7788,,770000,, MMWW cccooommmppprrriiisssiiinnnggg 111555,,,666222777 MMMWWW hhhyyydddrrrooo,,, 555999666999333 MMMWWW ttthhheeerrrmmmaaalll aaannnddd 333333888000 MMMWWW nnnuuucccllleeeaaarrr ppprrrooojjjeeeccctttsss aaasss sssuuummmmmmaaarrriiizzzeeeddd iiinnn Table 8.3. Table 8.3 Sector Hydro Thermal NNuucclleeaarr Total Coal Gas Diesel Total State 3482.0 1199998855..00 3316.4 0.0 23301.4 0.0 26783.4 Private 3491.0 99551155..00 2037.0 0.0 11552.0 0.0 15043.0 Central 8654.0 2233335500..00 1490.0 0.0 24840.0 3380.0 36874.0 Total 15627.0 5522885500..00 6843.4 0.0 59693.4 3380.0 78700.4 AAss ppeerr tthhee MMiidd TTeerrmm RReevviieeww,, tthhee lliikkeellyy ccaappaacciittyy aaddddiittiioonn ttaarrggeett dduurriinngg tthhee 1111th ppllaann ppeerriioodd wwaass 6622,,337744 MMWW.. AA ccaappaacciittyy ooff 5544996644 MMWW hhaass bbeeeenn ccoommmmiissssiioonneedd dduurriinngg 1111th Plan. The fuel-wise break-uupp ooff MMiidd TTeerrmm TTaarrggeett ooff capacity addition during 11th PPllaann iiss ssuummmmaarriizzeedd iinn Table 8.4.. AAccttuuaall CCaappaacciittyy aaddddiittiioonn dduurriinngg 1111th plan is given in Table 8.4(a) Table 8.4 SECTOR HHyyddrroo Thermal Nuclear Total (MW) CENTRAL 22992222 14920 3380 21222 STATE 22885544 18501 0 21355 PRIVATE 22446611 17336 0 19797 TOTAL 88223377 50757 3380 62374 ((1133..22%%)) (81.4%) (5.4%) (100)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 411 Table 8.4(a) SECTOR HHyyddrroo Thermal Nuclear Total (MW) CENTRAL 11555500 12790 880 15220 STATE 22770022 14030 0 16732 PRIVATE 11229922 21720 0 23012 TOTAL 55554444 48540 880 54964 ((1100..11%%)) (88.3%) (1.6%) (100) 8.4 EEMMIISSSSIIOONN FFAACCTTOORR ((kkgg//kkwwhh ooff CCOO ) 2 TThhee wweeiigghhtteedd aavveerraaggee eemmiissssiioonnss ((ttoonnnneess ooff CCOO //MMwwhh)) ffuueell wwiissee ffoorr ddiiffffeerreenntt ttyyppeess ooff ggeenneerraattiioonn aass ppeerr aaccttuuaall dduurriinngg 2 2010-1111 aanndd ppoossssiibbllee wwiitthh llaatteesstt tteecchhnnoollooggyy aarree iinnddiiccaatteedd iinn Table 8.5. Table 8.5 WWeeiigghhtteedd AAvveerraaggee EEmmiissssiioonnss FFuueell- Wise (tCO2/MWh) * Fuel DDuurriinngg 22001100-11 WWiitthh LLaatteesstt TTeecchhnnoollooggyy Coal 1.06 00..8888 ((SSuuppeerr CCrriittiiccaall HHRR 22332266)) Gas 0.44 0.34 (CCGT η - 53%) 0.25 (CCHP η - 70%) Oil 0.64 DG Sets 0.55 Bio Mass Co2 Neutral Co2 Neutral ** VVaalluueess ccaallccuullaatteedd oonn nneett ggeenneerraattiioonn TThhee aaccttuuaall eemmiissssiioonn ffaaccttoorr aanndd aabbssoolluuttee CCOO emission upto 2011-1122 ii..ee.. bbyy tthhee eenndd ooff 1111th Plan for Indian Power 2 SSeeccttoorr oonn tthhee bbaassiiss ooff ttoottaall ggeenneerraattiioonn iiss ggiivveenn iinn Chart 8.3. Chart 8.3 IItt ccaann bbee sseeeenn tthhaatt eemmiissssiioonn ffaaccttoorr hhaass bbeeeenn rreedduucciinngg oovveerr tthhee yyeeaarrss ddeessppiittee rriissee iinn CCOO eemmiissssiioonnss.. 2412 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 8.5 ELECTRICAL ENERGY REQUIREMENT PROJECTION The requirement of electrical energy by the end of 12th & 13th plan as per 18th EPS report is shown in Chart 8.4. Chart 8.4 18th EPS Demand Projections 1904 2000 1600 1354 1200 969 831 800 400 0 2009-10 Actual 2011-12 11Plan 2016-17 12th 2021-22 13th End Plan End Plan End To meet the power demand of the country during 12th & 13th Plan with as low increase in emissions as practicable, a Low Carbon Growth Strategy has been adopted in generation planning as summarized below. 8.6 LOW CARBON GROWTH STRATEGY Following are a few measures being considered to ensure low carbon growth during the 12th & 13th five year plans. (i) Promote Hydro Power Development Development of hydro projects from planning to commissioning takes a long time and therefore advance planning of hydro projects is necessary. CEA has prepared hydro development plan for the 12th five year plan in Sept, 2008. All out efforts were made to get timely Statutory Clearances of Projects identified for 12th Plan capacity and to ensure placement of orders for main packages in 11th Plan itself so that projects could fructify during the 12th Plan. Water & Water power is a state subject. A large no. of hydro project sites have been allocated to public & private companies for development. These projects are likely to be commissioned during 12th & 13th Plans. CEA has been monitoring the progress of survey & investigation and preparation of Detailed Project Reports and construction for these projects in close coordination with the developers. Based on the status of various hydro projects, it has been estimated that a capacity of about 10,897 MW could materialize during 12th Plan. In view of inherent advantages of hydro projects, they have been considered as must run in the planning exercise. (ii) Promote Renewable Energy including Solar Power The Renewable Purchase Obligation (RPO) has been notified by different SERCs for respective states. The Renewable Purchase Obligation (RPO) is the obligation mandated by the State Electricity Regulatory Commission (SERC) under the Act, to purchase minimum level of renewable energy out of the total consumption in the area of a distribution licensee. Feed in tariff for renewable energy has been notified by CERC and a number of State Electricity Regulatory )UB( tnemeriuqeR ygrenE ER BU¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 413 Commissions for different types of renewable generation. To promote use of renewable energy, Renewable Energy Certificate (REC) mechanism has been proposed by CERC. REC is a market based instrument to promote renewable energy and facilitate renewable purchase obligations (RPO). REC mechanism is aimed at addressing the mismatch between availability of RE resources in state and the requirement of the obligated entities to meet the renewable purchase obligation (RPO). Jawahar Lal Nehru National Solar Mission is a major initiative of the Government of India to promote ecologically sustainable growth while addressing India’s energy security challenge. It will also constitute a major contribution by India to the global effort to meet the challenges of climate change and tap the vast renewable potential available in India from solar power. MoP and MNRE are finalizing strategies for development of Solar Projects totaling 1000 MW through NVVNL by 2013 which includes 200 MW roof top solar by 2013 under phase-I of the programme. Further, SERCs are to specify RPOs in respect of solar energy and MoP is to make necessary modification in NEP/ Tariff Policy. One objective of the National Solar Mission is to create an enabling policy framework for the development of 20,000 MW of solar power by 2022. (iii) Promoting New Gas based Generation There is a need to develop gas based generation capacity in the country in order to meet our growing demand of power and reduce CO emissions. Besides being environmentally benign, the gas projects have high efficiency, low gestation 2 period, low capital cost and require less land and water. Gas projects are ideally suited for meeting peaking requirements. CEA has already projected the following additional requirement for 12th Plan. Adding gas based flexible peaking capacities also reduce backing down of coal based power plants and in turn lower CO emissions. 2 Table 8.6 Additional gas requirement for 12th plan Particulars Gas capacity in Gas requirement at 70% PLF MW (mmscmd) CCHP Capacity 2,000 8.0 Gas based capacity at the brown field sites or at green 21,000 78.0 field sites including Peaking Gas based capacity to be located near large 2,000 4.0 * cities Total 25,000 90.0 * Considering operation for about 5-6 hours daily for peak load and in contingencies However, in view of reduced production from KG basin in recent past, even the firm quantity of allocated gas is not being supplied to power plants and the country is facing huge generation loss. Most of the existing power plants are operating at very low PLF and few power plants are lying idle due to non-availability of gas. Presently, about 13,000 MW gas based capacity in the country is under various stage of construction. But non-availability of gas to new power plants at present, have serious constraint in development of gas power plant in the country. Import of RLNG with proper policy support is required to promote new gas based generation in India. (iv) Notification of CEA regulation on construction of power plants indicating mandatory minimum efficiency levels CEA’s technical regulation for construction of electrical plants and lines has been notified in August, 2010. These regulations indicate mandatory minimum efficiency level of power plants and transmission equipments. (v) Retirement of Old and Inefficient Coal based Generating units Retirement of Old and Inefficient thermal Plants and replacing them with new and more efficient units is an effective way of using the fuel and minimizing GHG Emissions. During the 11th Plan 1500 MW of capacity was retired. This comprises of coal and lignite units of unit size lesser than 100 MW.414 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] A capacity of about 4000 MW is proposed to be retired during the 12th and 13th Plan each which includes the remaining units of coal & lignite under 100 MW, gas plants more than 30 years old (1987 & before) and some coal based units of 110 MW capacity. (vi) Implementation of National Enhanced Efficiency Renovation and Modernization Program. CEA has already prepared a National Enhanced Efficiency Renovation and Modernisation Programme for implementation during 11th and 12th Plans. This covers R&M of 18965 MW capacity during 11th Plan and 4971 MW during 12th Plan. Renovation and Modernisation (R&M) and Life Extension (LE) of existing old power stations provide an opportunity to get additional generation at low cost in short gestation period. Besides generation improvement, it results in improvement of environmental emissions and improvement in availability, safety and reliability. To incentivise States, 50% of generation capability of the unit just before shut down for R&M may be compensated by way of additional allocation from unallocated quota during the normative period of shut down. Low interest rate financing for enhanced efficiency based R&M has also been initiated. (vii) Adoption of Clean Coal Technology As per Low Carbon Growth Strategy, adoption of clean coal technology which includes addition of Super Critical units, promotion of IGCC, CFBC technology is being adopted for future plans. During the 12th Plan about 35% of Coal based capacity is being planned on super critical and in 13th Plan it has been proposed that all coal based capacity is to be based on super critical technology. In this regard following action has been taken/required to be taken. Action: (a) Creation of Indigenous manufacturing capacity for super critical equipment (b) Incentivising Indigenous Manufacturers to ensure transfer of Super Critical Technology (c) Bulk tendering for 11X660 MW Super Critical units with mandatory indigenous manufacturing in progress. To initiate Bulk Tendering for 800 MW size units shortly after finalising orders for 660 MW. (d) Bulk tendering for projects based on Ultra super critical technology with mandatory indigenous manufacturing in consultation with indigenous manufacturers. (e) MOEF may be advised not to clear any Coal based projects w.e.f. 01-04-2012 on Sub-critical technology. No coal linkages for Sub-critical plants for 13th Plan (f) It is proposed that on Super Critical Plants there should not be any custom duty and excise duty i.e. the same exemption for excise duty and custom duty as applicable to Mega Power Projects. (viii) Nuclear Power Generation Nuclear generation is also limited due to availability of natural uranium in the country. Department of Atomic Energy plans to put up a total installed nuclear power capacity of 20,000 MWe by the year 2020 in the country. As of now, the first stage programme based on indigenous fuel is in progress and has reached a stage of maturity. A beginning has been made of the 2nd stage programme with construction of 500 MWe PFBR (Prototype Fast Breeder Reactor). This is expected to be followed by four more 500 MWe units by the year 2020. Thereafter it will be followed by a number of FBRs. When the capacity through FBRs builds up to reasonable level, the deployment of thorium for power generation through 3rd stage will begin and get realized in the long term. Although nuclear energy can make only a modest contribution over the next 15 years, longer-term consideration of even a modest degree of energy self-sufficiency suggests the need to pursue the development of nuclear power using thorium. India can erect and run nuclear plants to a capacity of 60GW by 2031-32. The full development of the country’s hydro-electric potential and realization of the optimistic nuclear scenario by 2031-32 needs to be persued. With the signing up of the '123 Agreement' on nuclear cooperation between USA and India, and NSG’s waiver for supply of nuclear fuel to India, it is expected that some nuclear plants with foreign technology from friendly countries would be set up in the country. The availability of imported nuclear fuel and technology to India will help in accelerated capacity addition from nuclear power plants. Commencement of construction of reactors with imported technology during 11th/12th Plans is expected which will get commissioned in 13th Plan onwards. Development of nuclear parks with Mega capacity is also anticipated. Integrated Energy Policy indicates two scenarios of nuclear capacity addition of about 48,000 MW in low nuclear scenario and 68,000 MW in high nuclear scenario by 2031-32. (ix) Reduction of T&D losses to be accorded high priority All India T&D Losses are very high of the order of 23.97 %. To reduce T&D losses, implementation of R- APDRP to reduce technical and commercial losses are being accorded highest priority. Privatization/franchisee of distribution should be encouraged as these measures are expected to help in reducing AT&C Losses. (x) Implementation of BEE Programmes Bureau of Energy Efficiency (BEE) has launched various programme to promote efficiency in use of electrical energy as per details given below: • Implementation of ECBC in states • DSM in municipal, agriculture and buildings¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 415 • Enforcement of energy intensity standards in Energy Intensive Industry and trading of emission reduction certificates. • CFL Bachat Lamp Yojna • Agriculture (Ag DSM) Pump efficiency improvement through ESCO. • Labeling of Appliances • Labeling of Inverters on priority (xi) Utilization of Coal Bed Methane (CBM) In India, scope for simultaneous operations for CBM and oil and gas exploration/production in the same area exists in Cambay basin (Gujarat), Barmer Basin (Rajasthan) and Cauvery basin (Tamil Nadu) wherein both CBM and Oil & Natural Gas occur in the same basinal areas. As far as technical feasibility and horizontal/vertical separation of CBM operations and Oil & Gas operations are concerned it is very well established that both operations could be carried out simultaneously. However, certain broad guidelines and procedures may have to be followed in this endeavor. Director General Hydro Carbon under MoP&NG is the nodal agency for CBM. Till date 26 blocks have been allocated. 8.7 IMPROVEMENT IN EFFICIENCY OF THE THERMAL GENERATION CAPACITY (COAL, LIGNITE AND GAS) With the introduction of supercritical technology and new gas based capacity and retirement of old units, the thermal efficiencies at the end of the 11th, 12th & 13th Plans are expected to increase as given in Table 8.7 & Chart 8.5 below: TABLE 8.7 Thermal Capacity at the end of Thermal Efficiency (%) Plan End of 10th Plan (Actual) 84, 812 33.86 End of 11th Plan (with 1500 MW retirement) 1, 31, 853 35.13 End of 12th Plan 1, 98,756 35.94 ( with 4000 MW retirement) End of 13th Plan (With 4000 MW 2, 51, 156 36.94 Retirement) Chart 8.5 Efficiency of the Thermal capacity at the end of 10th, 11th, 12th and 13th Plans 38.0 36.94 37.0 35.94 36.0 35.13 35.0 34.0 33.0 32.44 32.0 31.0 30.0 End of 10th End of 11th End of 12th End of 13th Plan Plan(with Plan( with Plan( with retirement) retirement) retirement) This increase in efficiency of thermal units will result in reduced emission factor further. Further reduction is expected due to increase in generation from nuclear, hydro and renewable resources under various scenarios as listed below. )%( ycneiciffE lamrehT416 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 8.8 CAPACITY ADDITION REQUIRED DURING 12TH & 13TH PLANS Four Scenarios have been developed for capacity addition during 12th & 13th Plan periods. The Business as Usual Scenarios with low gas and low renewable Scenario is the Base Case. The capacity addition required during 12th & 13th Plan has been worked out based on the results of the Planning studies carried out using EGEAS software model. Studies have been carried out for 12th & 13th plan periods taking into account the existing capacity, actual capacity addition during the 11th Plan and the options available for 12th Plan. Capacity addition required has been assessed to meet the seasonal requirements also. Hydro capacity has been restricted to the feasible capacity of 10,897 MW in the four different scenarios. Retirement of old inefficient units also has been considered as given in the table of capacity addition. Renewable capacity has been assumed to operate at 20% PLF. Based on results of the studies, generation capacity addition required during 12th & 13th Plans are summarised in Table 8.8 & 8.9 below : Table 8.8 Four Capacity Addition Scenarios-12th Plan SC-1 SC-2 SC-3 SC-4 Low Gas Low High Gas Low High Gas High Low Gas High Renewables Renewables Renewables Renewables (Base Case) Hydro 10,897 10,897 10,897 10,897 Nuclear 5,300 5,300 5,300 5,300 Renewable(Excluding Solar) 14,500 14,500 20,000 20,000 Solar 4,000 4,000 10,000 10,000 Retirements of Old inefficient 4,000 4,000 4,000 4,000 Units Gas 2,540 14,540 14,540 2,540 Coal 68,363 56,363 53,163 64,363 Sub-Critical 43,443 31,443 28,243 39,443 Super Critical 24,920 24,920 24,920 24,920 12th Plan (Total) 87,100 87,100 83,900 83,100 (Conventional) TABLE 8.9 Capacity Addition Scenario-13th Plan SC-1 Low SC-2 SC-3 SC-4 Gas Low High Gas Low High Gas High Low Gas High Renewables Renewables Renewables Renewables (Base Case) Hydro 12,000 12,000 12,000 12,000 Nuclear 18,000 18,000 18,000 18,000 Renewable (Excluding 14,500 14,500 25,000 25,000 Solar) Solar 16,000 16,000 20,000 20,000 Retirements of Old 4000 4000 4000 4000 inefficient Units Gas 0 13,000 13,000 0 Coal 56,400 45,200 37,200 54,800 Sub-Critical 10,000 0 0 0 Super Critical 46,400 45,200 37,200 54,800 12th Plan (Total) 86,400 88,200 80,200 84,800 (Conventional)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 417 8.9 EEMMIISSSSIIOONN PPRROOJJEECCTTIIOONNSS UUPPTTOO TTHHEE EENNDD OOFF 1133th PLAN (2021-22) OOOnnn ttthhheee bbbaaasssiiisss ooofff gggeeennneeerrraaatttiiiooonnn fffrrrooommm eeeaaaccchhh fffuuueeelll sssooouuurrrccceeesss iiinnncccllluuudddiiinnnggg rrreeennneeewwwaaabbbllleeesss,,, cccaaarrrbbbooonnn fffooooootttppprrriiinnnttt iii...eee... EEEmmmiiissssssiiiooonnnsss aaannnddd ttthhheee eemmiissssiioonn ffaaccttoorr iinntteennssiittyy ccoonnssiiddeerriinngg bbaassee yyeeaarr ooff 22000044-0055 hhaavvee bbeeeenn wwoorrkkeedd oouutt,, TThhee EElleeccttrriiccaall ggeenneerraattiioonn ggrroowwtthh during the plans considered anddd ttthhheee aaavvveeerrraaagggeee eeemmmiiissssssiiiooonnn fffaaaccctttooorrr fffrrrooommm tttoootttaaalll gggeeennneeerrraaatttiiiooonnn aaarrreee ssshhhooowwwnnn iiinnn Chart 8.6 below : Chart 8.6 AAvveerraaggee EEmmiissssiioonn FFaaccttoorr ffrroomm TToottaall GGeenneerraattiioonn (Kg/kWh) AAvveerraaggee EEmmmmiissssiioonn FFaaccttoorr FFrroomm TToottaall GGeenneerraattiioonn ((KKgg//kkWWhh)) 0.8 0.78 0.744 0.741 0.715 0.706 0.7 0.703 0.694 0.656 0.644 0.641 0.630 0.6 End of 2004-05 EEnndd ooff 1100tthh PPllaann End of 11th Plan End of 12th Plan EEnndd ooff 1133tthh PPllaann (2006-07) (2011-12) (2016-17) (2021-22) Sc-1 Sc-2 Sc-3 Sc-4 IItt mmaayy bbee sseeeenn tthhaatt tthhee aavveerraaggee eemmiissssiioonn ffaaccttoorr iiss eexxppeecctteedd ttoo rreedduuccee iinn tthhee rraannggee ooff 1155%% ttoo 2200% by the end of 13th Plan (2021-2222)) iinn ffoouurr sscceennaarriiooss ffrroomm tthhee lleevveell ooff 22000044-0055 dduuee ttoo vvaarriioouuss mmeeaassuurreess mmeennttiioonneedd aabboovvee.. HHoowweevveerr,, tthhee ttoottaall eemmiissssiioonn ffrroomm ppoowweerr sseeccttoorr wwoouulldd iinnccrreeaassee aass sshhoowwnn iinn Chart 8.7 below: Chart 8.7 8.10 AANNTTIICCIIPPAATTEEDD PPEERRCCEENNTTAAGE REDUCTION IN EMISSSIIOONN IINNTTEENNSSIITTYY ((KKGG CO2/ TEN ```` OF GDP) FOR POWER SECTORR WW..RR..TT.. YYEEAARR 22000044-05 TToo aasssseessss eemmiissssiioonn iinntteennssiittyy bbaasseedd oonn ppoowweerr sseeccttoorr eemmiissssiioonnss ffoorr yyeeaarr 22002211-2222,, aaccttuuaall GGDDPP ddaattaa uuppttoo 22000077-08 has been taken from Economic Surrrvvveeeyyy RRReeepppooorrrttt ooofff CCCeeennntttrrraaalll SSStttaaatttiiissstttiiicccaaalll OOOrrrgggaaannniiizzzaaatttiiiooonnn aaannnddd ttthhheeerrreeeaaafffttteeerrr ppprrrooojjjeeecccttteeeddd dddaaatttaaa aaattt 888%%% CCCAAAGGGRRR hhhaaasss bbeeeenn uusseedd.. IInnddiiaa’’ss EEmmiissssiioonn IInntteennssiittyy ((kkgg CCOO22// tteenn ` ooff GGDDPP)) bbaasseedd oonn PPoowweerr SSeeccttoorr EEmmiissssiioonn iiss ssuummmmaarriizzeedd iinn Table 8.10.418 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Table 8.10 Emission Intensity based on Power Sector Emissions YEAR GDP IN RS. CO2 EMISSIONS(MT) CO2 IN KG/ Ten ` of GDP CRORE SC-1 SC-2 SC-3 SC-4 SC-1 SC-2 SC-3 SC-4 2004-05 2388768 462 462 462 462 0.193 0.193 0.193 0.193 2006-07 2871118 495 495 495 495 0.172 0.172 0.172 0.172 2007-08 3306735 521 521 521 521 0.158 0.158 0.158 0.158 2011-12 4498776 749 749 749 749 0.166 0.166 0.166 0.166 2016-17 6610178 1030 1013 1000 1018 0.156 0.153 0.152 0.154 2021-22 9712521 1330 1306 1278 1299 0.137 0.134 0.132 0.134 8.11 CONCLUSION • An increase in thermal efficiency is expected from 33.86% by end of 10th Plan (2006-07) to 36.94% by the end of 13th Plan (2021-22). • Average Emission Factor from total generation (including renewable) is also expected to decrease from actual 0.744 in year 2006-07 to 0.656 by 2021-22. While estimating the above benefits, effect of strategies like R&M etc have not been incorporated for 13th Plan. • Efforts are required to be made to accelerate R&M Programmes as well as Energy Conservation measures at the generation and consumer end. Thrust to adoption of latest technologies, in particular clean coal technologies needs to be vigorously pursued. • It is feasible to achieve reduction in emission factor (CO per unit of generation) from power sector by nearly 2 15% less in 2022, compared to 2005. The percentage reduction expected in Emission Factor (CO produced 2 per Kwh of generation) in all the four scenarios at the end of 11th, 12th & 13th Plans w.r.t. year 2004-05 is indicated in Table 8.11 below : Table 8.11 Scenarios End of 10th Plan End of 11th Plan End of 12th Plan End of 13th Plan (2006-07) (Actual) (2011-12) (2016-17) (2021-22) Scenario-1 4.6 5.0 8.3 15.9 Scenario-2 9.9 17.4 Scenario-3 11.0 19.2 Scenario-4 9.5 17.8 • It is feasible to achieve percentage reduction in Emission Intensity (Kg CO / ten ` of GDP) for Power Sector 2 by the end of 13th Plan (2021-22) w.r.t. year 2004-05 by around 25-30% assuming GDP growth of 8%. ---+++---¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 419 CHAPTER 9 KEY INPUTS FOR 12TH PLAN 9.0 INTRODUCTION For successful implementation of any Power Plan, it is essential that all key inputs required for implementation of the power expansion programme are made available as per the schedule of requirement of the individual power projects. The timely supply of all key inputs would ensure timely completion of the project and therefore avert detrimental implications of cost and time overruns in case the power project is delayed. This Chapter broadly deals with an assessment of requirement of Equipment for 12th Plan for generation capacity addition and key inputs required during these Plan periods, namely, Steel, Cement, aluminium for infrastructure requirement of generating plants. An assessment of fuel, manpower and fund requirement for execution of power generation works during 12th Plan has also been made. It is felt that the assessment of requirement of equipment, material and fuel as covered in this Chapter would give sufficient input to other Ministries and to the industry to enable them to take advance action and plan their production targets etc. according to the requirement of the Power Sector. 9.1 CAPACITY ADDITION PROGRAMME A capacity addition of about 87,100 MW is required during the 12th Plan in the Base Case to meet the All-India demand projections of the 18th EPS Report. Accordingly, as approved by Planning Commission, a capacity addition target of 88,537 MW has been finalized for the 12th Plan. Details of capacity addition being planned for the 12th Plan are given below : TABLE 9.1 Type Wise Capacity Additions during 12th Plan (Figs in MW) Item 12th Plan (2012-17) Coal+Lignite based 69,800 Gas based 2,540 Hydro 10,897 Nuclear 5,300 Total 88,537 9.2 EQUIPMENT Requirement of equipment is one of the most important inputs for the setting up of Power Projects. Adequate domestic manufacturing capacities & capabilities for main plant equipment would be available to meet the demand of the 12th Plan capacity addition programme as a result of the push given by the Government for indigenous manufacturing of main plant equipment during the 11th Plan. To ensure energy security it is vital that the manufacturers give reliable services as well as spares during the life time operation of the Plant; accordingly it is essential that a level playing field is provided to manufacturers so that a healthy competition ensures competitive prices and quality equipment. A number of 11th Plan projects have not been able to achieve full load operation within stipulated time from synchronization due to non-readiness of the balance of plant. 9.2.1 Main Plant Equipment In the category of coal based power plant, switch-over to super critical technology is envisaged for the new capacities coming up in 12th / 13th Plan and beyond.420 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Based on the encouragement from Government of India for setting up domestic manufacturing facilities, a number of new manufacturers have come forward for setting up manufacturing facilities for Steam Generators and Turbine Generators. These include: 9. L&T-MHI 10. Toshiba-JSW 11. Alstom-Bharat Forge 12. Gammon - Ansaldo 13. BGR-Hitachi 14. Doosan 15. Thermax-Babcock 16. Cethar Vessel—Riley Power Joint Venture Boilers Turbine-generator Remarks L&T-MHI 4000 MW 4000 MW • Production for Boiler and turbine commenced Alstom -Bharat - 5000 MW • All manufacturing facilities for Forge manufacture of turbines to be completed by June 2013. Toshiba- JSW - 3000 MW • All manufacturing facilities to be completed by April-2013 Gammon- Ansaldo 4000 MW - • Probable date of completion of facilities December, 2012 (2000 MW) and December 2014 (additional 2000 MW) Thermax-Babcock 3000 MW • All manufacturing facilities to be & Wilcox completed byMarch. 2013. BGR Hitachi 5 Boiler per annum • All manufacturing facilities to be Boilers Private Ltd. (~3000 MW completed by Jan. 2013. BGR Hitachi 5 Turbine generators • All manufacturing facilities to be Turbine Generator per annum (~3000 completed by July. 2014. Private Ltd. MW Doosan Chennai 2200 MW *(Both • DCW pvt ltd is 100% subsidiary of Doosan works Pvt. Ltd. subcritical and Korea, incorporated in India on 20.7.2000 Supercritical • Existing facility- Chennai: Additional facility acquired- Mannur village Kancheepuram district • Production from additional facilities to start by Sept.2012 In addition, BHEL has also augmented its capacity from 6,000 MW per annum in 10th Plan to 15,000 MW per annum at the end of 11th plan (2011-12). From the information provided by the manufacturers, it has emerged that following domestic capacities shall be available for supercritical steam generators and turbine generators. By 2013-14 By 2014-15 SG (MW) 26,500 40,500 TG (MW) 30,020 35,020 9.2.2 Balance of Plant (BoPs) Balance of Plants such as Coal Handling Plant, Ash Handling Plant, Water Treatment/DM Plant, Cooling Towers, CW System, Chimney, Plant electrical and switchyard etc. have been identified as critical items for timely commissioning of thermal power projects. BoPs have been and continue to be a critical area for achieving capacity addition targets. To mitigate risk associated with BOP systems initiatives like standardisation of BOP systems,¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 421 reviewing the qualifying requirements to ensure quality vendors and large vendors for faster execution of projects, mandating a central organization to maintain a dynamic data base with regard to BOP orders and their liquidation. It is also felt that the latest methods of civil construction with mechanised equipment and man power mobilization needs to be adopted. The vendors have to be encouraged to adopt new erection technologies to reduce the erection and commissioning cycle. An institutional mechanism to develop skilled man power for construction & execution of projects is also to be stressed upon. As per the information compiled by CEA, sufficient numbers of vendors are available for major BoPs. Details of BoP vendors are as follows: NUMBER OF BOP VENDORS Coal handling System 15 Ash Handling System 13 Cooling Towers 12 DM Plants 18 Few suggestions regarding BOP equipment for ensuring timely capacity addition are as follows: • Developers may execute BOPs on EPC basis. • A web based portal needs to be designed and managed for all information relating to BOP vendors viz. orders at hand, their implementation status etc. so that developer of projects can take an informed decision. • In second phase the BOP vendors and Construction agencies could be rated based on their performance. • Work in hand/Bid Capacity etc. should find place in bid documents. • Training of Skilled/Semi-skilled workers for Power project requirements to be taken by EPC Contractors, Developers as well as the Manufacturers. 9.3 KEY MATERIALS Steel and cement are the key materials needed for power projects. In case of both hydro and thermal projects, the requirement of steel and cement are site specific and the civil engineering works vary from project to project depending upon the features of the projects. In case of thermal projects, the civil works would be more when the first unit of the thermal project is installed on a virgin site than for an additional unit installed at the same site. However for the purpose of estimating the requirement, suitable consumption norms have been worked out based on the actual consumption of steel and cement for the works completed during the past and also in respect of projects under execution. In view of this, the assessment of steel and cement required for hydro and thermal projects in 12th Plan would be only approximate. 9.3.1 Norms for material requirement: The Norms used for computing material inputs for power generation projects are as given in Table 9.2 below: Table 9.2 Norms for Key Inputs (Figures in Tonnes/MW) NORMS FOR INPUT MATERIALS FOR GENERATION PROJECTS Requirement of Thermal Hydro Remarks Materials/MW Coal/Lignite Gas Based Based a) Cement 150 60 956 b) Structural steel 85 29 34 c) Reinforcement steel 45 24 93 d) Stainless steel 130.61 51.6 - Used in Bunker e) Aluminium 0.5 0.5 0.1 Used in windows, metal cladding walls, control rooms422 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 9.3.2 Material Requirement Requirement of key materials for 12th Plan and 13th Plan corresponding to generation expansion plan has been worked out as per the norms and given in Table 9.3 and 9.4 below: Table 9.3 Key Inputs for 12th Plan (Figures in Million Tonnes) Sl. No. Materials Thermal Capacity Hydro Total Capacity Coal based & Gas based 10,897 Lig 69,800 MW 2,540 MW MW 1. Cement 10.47 0.15 10.42 21.04 2. Structural steel 5.93 0.07 0.37 6.37 3. Reinforcement steel 3.14 0.06 1.01 4.21 4. Stainless steel 9.11 0.13 0 9.24 5. Aluminium 0.04 0.001 0.001 0.042 Table 9.4 Key Inputs for 13th Plan (Figures in Million Tonnes) Sl. No. Materials Thermal Capacity Hydro Total Capacity Coal based No Gas based 12000 MW 56,400 MW considered 1. Cement 8.46 0 11.47 19.93 2. Structural steel 4.79 0 0.41 5.2 3. Reinforcement steel 2.54 0 1.12 3.66 Based on the assessment of Nuclear Power Corporation (NPCIL), requirement of Steel, Cement and other materials for nuclear projects is considered at 130% of the requirement of coal based projects for planning purposes. Considering the above, the material requirement for Nuclear Projects estimated by CEA is as given under in Table 9.5. Table 9.5 Key Inputs for 13th Plan Nuclear (Figures in Million Tonnes) Material 12th Plan 13th Plan 5,300 MW 18,000 MW Cement 1.04 3.51 Structural Steel 0.58 1.99 Reinforcement Steel 0.31 1.05 The main inputs for manufacturing power plant equipment are castings & forgings, steel plates, structural steel, copper, CRGO/CRNGO etc. While Steel, Cement, Copper, Aluminium etc. are the key inputs needed for erection & commissioning and transmission & distribution networks. Some estimates regarding these key inputs are given in the following Tables. Castings & Forgings for Turbo-Generators (TG) Sets: As per the details provided by BHEL the average requirement of castings and forgings for a 500/660/800 MW sets is as given below : MT per Set Equipment Weight of Castings Weight of Forgings Turbine 384 235 Generator 3 130 Total 387 364¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 423 The requirements of Castings and forgings for thermal projects based on the above average, have been worked for the 12th and 13th Plans. Based on projects identified for 12th Plan, 35% supercritical sets in 12th Plan and 100% supercritical sets for 13th Plan have been considered. Lakh MT Material 12th Plan 13th Plan 69,800 MW 56,400 MW Castings 0.40 0.33 Forgings 0.37 0.31 Note: As norms for nuclear projects are not received, requirement for nuclear is not included. Also, requirement of Casting & Forgings for Hydro projects are very project specific, hence not included. Sufficient indigenous capacities for heavy castings & forgings need to be created to reduce dependence on imports. As per the details of norms provided by BHEL, the requirement of Tubes & Pipes and Thick Boiler Quality Plates (Imported Plates) is given below. As per the projections 35% supercritical sets have been assumed in 12th Plan and 100% supercritical sets have been assumed for 13th Plan. Lakh MT Material 12th Plan 13th Plan 69,800MW 56,400 MW Tubes & Pipes 7.2 5.99 Thicker Boiler Quality Plates 0.94 0.91 Indigenous capacity availability scenario of tubes & pipes as provided by BHEL: Lakh MT Material 12th Plan 13th Plan Tubes & Pipes 3.9 4.8 Thicker Boiler Quality Plates - - Considering large quantity of high alloy tubes & pipes (like T91/P91, T92/P92 grades) required for super critical boilers and thick plates requirement, sufficient indigenous capacities need to be created in the country to avoid dependence on the imports. Copper: As per IEEMA, power sector requirement of Copper would be approx. 12.5 lakh MT p.a. with an overall requirement of approx. 56 lakh MT for entire 12th Plan. This is expected to grow at a CAGR of approx. 10% p.a. As per the information provided by FIMI for Copper, the capacity, production and consumption for 12th Plan is given below: Lakh MT 12th Plan (2012-17) Capacity Production Consumption 2012-13 10.0 8.0 8.8 2013-14 10.0 8.5 9.8 2014-15 15.0 13.2 11.0 2015-16 15.0 13.5 12.3 2016-17 15.0 13.7 13.3 Aluminium: Following norms for the Aluminium requirement have been considered for working out Aluminium requirement: Norms for Aluminium for Generating Stations:424 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] (MT per MW) Materials Thermal Hydro Remarks Coal Gas based Nuclear Based Based Aluminium 0.5 0.5 130% of Coal 0.1 Used in windows, metal cladding Based walls, control rooms, conductors Aluminium requirement for Generating Stations in 12th & 13th Plan: (Figures in Lakh MT) Material 12th Plan 13th Plan Coal Gas Based Nuclear Hydro Coal Based Gas Nuclear Hydro Based Based Based Based 69,800MW 2,540MW 5,300 MW 10,897 56,400 - 18000 12000 MW MW MW MW Aluminum 0.349 0.012 0.034 0.010 0.282 - 0.117 0.012 Total 0.405 0.411 Prima facie there is no likely shortage of key materials except for CRGO, and thicker steel plates. Further, there is an inadequate indigenous manufacturing capacity in the country for Tubes & Pipes especially for alloy steel tubes & Pipes (T91/P91, T92/P92 grades), which needs to be augmented. Some indigenous capacity for heavy castings & forgings which are critical for power generating equipments, are being planned by a major private sector manufacturer and are expected to come up in near future. 9.4 FUEL REQUIREMENT Availability of fuel is essential for power generation. In addition to tapping fuel source or organizing its availability, it is also essential to create the infrastructure to facilitate fuel to reach the intended destination. Therefore development of mines/ ports and requisite transportation facilities commensurate with the completion of the projects is very necessary. The gestation period in the development of mines and even transport facilities are in some cases longer than the gestation period for setting up of thermal power stations. It is therefore imperative for the Power Sector to make its prospective coal requirement, over a long time horizon, known to the Ministry of Coal, Railways and port authorities to enable them to undertake co-ordinated development of coal mines and transport infrastructure with the coming up of thermal power stations. Necessary infrastructure required to transport gas to the projects also needs to be set up. With this objective in view, the assessment of fuel requirement has been carried out. The coal requirement for thermal power stations depends upon the scheduled generation, quality of coal being supplied/ to be supplied and the condition of power station equipment. However the normative requirement of fuel during the terminal year of 12th Plan has been estimated as summarised below: Table 9.6 FUEL REQUIREMENT FOR TERMINAL YEAR OF 12TH PLAN Fuels Requirement 2016-17 Coal (Million Tonne) 842 Gas +LNG (MMSCMD) 100* * This requirement corresponds to gas based capacity of 18,381 MW by the end of 11th Plan and additional requirement of for 12th Plan projects of about 2,540 MW capacities to operate at 90% PLF. The gas requirement of additional 13,000 MW projects under construction has not been considered due to non availability of gas.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 425 Transport Transport sector plays a vital role in the growth of Power Sector. The development of different transport sectors like Railways, Highways & Roads, Ports, Inland Waterways and Gas pipelines are key to achieve the capacity addition targets in XII five year plan. The total coal requirement for the power utilities by end of 12th Plan (2016-17) is estimated to be around 842 MT including domestic & Imported coal as also coal from the captive coal blocks. Apart from this, with the increase in Unit sizes to 660 MW, 800 MW and plus 1000 MW during 12th plan and beyond, heavy Over Dimensional Consignments (ODC) as never before will need to be transported from Ports (for imported equipment) and Indigenous Manufacturers to Project sites. This calls for bold initiatives, policy changes as well as adopting basic changes in load and handling specifications in Roads, Railways and Port sectors. Railways The long-term strategy of Indian Railways is to segregate the freight and passenger movement through construction of Dedicated Freight Corridors (DFCs). At present two DFC projects i.e. Eastern DFC (Dankuni, WB - Ludhiana, Punjab) and Western DFC (JNPT, Mumbai- Dadri, UP) have been sanctioned. Apart from above Railways have also planned Gauge conversion, new railway lines, electrification of new routes and procurement of locomotives and wagons. Broadly, Railways envisage the following targets for the medium and long-term goals (XII five year plan & beyond) towards creation of infrastructure and capacity build-up. Table 9.7 Broad Category Revised XI plan Targets Vision 2020 Targets Doubling including DFC 2500 12,000 Kms. Gauge Conversion 6000 12,000 Kms. New Lines 2000 25,000 kms. Electrification 4500 14,000 kms. Procurement of Wagons 62000 289,136 Procurement of Diesel locomotives 1019 5334 Procurement of Electric locomotives 1205 4281 To achieve, the projected high-growth targets, Railways need massive investments in capacity creation, network expansion and up-gradation and modernization. The existing trunk routes and other coal carrying routes are heavily saturated. Railways needs to strengthen its net work speedily to achieve this high growth scenario. The tentative estimates of Investments required by the year 2020 to deal with higher levels of freight traffic would be as under: Table 9.8 Description Investment (Rs)` Bottleneck removal – 23,000 cr Traffic facilities, freight bye-passes, logistic parks, etc. Capacity augmentation- New Line, 1,80,000 cr. Doubling/Tripling/Quadrupling including DFC 1,30,000 cr. Gauge conversion, 35,000 cr. Electrification 12,600 cr. Rolling stock - Freight wagons, 86,740 cr. Diesel locomotives, 56,007 cr. Electric locomotives 64,873 cr. Technological up- gradation - Track renewal and 25 tonne axle load, 71,405 cr. Bridges 8,000 cr.426 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] The expansion plans detailed in the Vision 2020 documents of Railways gives a sense of confidence that to a large extent Railways will be able to meet Power Sector requirements for 12th Plan and beyond, provided of course that their expansion takes place as per their vision document. Inland Water Transport Inland Waterways Authority (IWT) of India has planned for the development, up-gradation, modernization and expansion of National Waterways / other Waterways during 12th plan period with an estimated investment of Rs. 10,460 Crores. Keeping this in view, there is a strong possibility of coal cargo movement through IWT becoming attractive to power companies especially if the contract of imported coal movement by IWT of 3.0 million tonnes per annum from Haldia to Farrakka Project of NTPC is a success. At present, ten thermal power stations are operational on the banks of Ganga and these are located in the States of West Bengal (7) and Bihar (3). Further eleven more Thermal Power Stations are proposed in Bihar and Uttar Pradesh with installed capacity of over 15000 MW. Their coal requirement is estimated to be around 70 million metric tonnes per annum, which can be met through IWT. National Highways The National Highways comprise of only around 2% of the total Road Network in India but carry more than 40% of the Traffic. This makes route management of heavy Over Dimensional Consignments (ODCs) highly challenging and difficult. There are serious issues associated with ODC transportation through roads / highways like interpretation of Motor Vehicle Act differently in different states, inadequate strength of roads and Bridges enroute to the project sites, insufficient road width / carriage width in state highways, improper design of Toll Plazas built on the Highways, sharp curves/bends/gradients on roads and inadequate vertical clearance in underpasses in North Eastern states etc. These need to be addressed urgently including necessary fundamental changes in loading specifications of roads, highways and bridges for which specific recommendations have been given in the Report. (cid:1) Railways are transporting about 60% of the total off-take of domestic coal. (cid:1) The percentage share will remain the same during the 12th plan. (cid:1) Railways to confirm their coal evacuation capacity from each coal field. (cid:1) Railways to augment their capacity to evacuate coal from three major coal fields namely North Karampura, Ib Valley and Mand Raigarh. (cid:1) For smooth and faster evacuation of coal, coal conveyors should be used to transport coal from mine to rail head with automatic loading in wagons. (cid:1) Railway to expedite proposed Dedicated Freight Corridors to segregate freight and passenger traffic. (cid:1) Railways to ensure rail connectivity to all ports having coal unloading facilities. (cid:1) NTPC and Inland Water Ways Authority of India (IWAI) would be signing an agreement for transportation of 3 MT of imported coal to Farakka TPS. Other thermal projects located on the banks of Ganges in West Bengal and Bihar should also explore the same. Roads and Highways need to be augmented for transportation of Over Dimensioned Consignments (ODC) for supercritical units. The following needs to be considered: (cid:1) Amendment in Motor Vehicle Act to accommodate heavy consignments above 49 MT and inclusion of hydraulic axles, trailers. (cid:1) Review of load classification for Roads & Bridges by IRC/ MoRTH to accommodate ODCs beyond 100 MT. (cid:1) Single window clearance and one time payment for ODC movement. (cid:1) Proper design of Toll Plazas built on highways. (cid:1) Changes in Road design in North Eastern & Hill states to minimise sharp curves/gradients in roads and have sufficient vertical clearance in underpasses. (cid:1) Proper Approach Roads to be provided for Hydro Projects. Existing & Proposed Gas Pipelines / Grid (cid:2) Natural gas is the fastest growing primary energy source amongst fossil fuels, projected to grow around 3-4 times between 2002-2025 at current consumption level. We have come a long way from the time when oil and gas were first discovered in India in 1886 in Assam and subsequently when the famous Bombay High field was discovered in 1974 in the Western Offshore.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 427 (cid:2) With developing gas market, timely development of gas pipelines across the country for realization of social and economic benefits of natural gas usage has become a priority. Such trunk gas pipelines when integrated with the existing gas pipelines shall ultimately lead to the National Gas Grid. The indicative National Gas Grid shall consist of the existing pipelines, authorized / planned pipelines and their links to the remote and under-developed areas. (cid:2) EGOM (Empowered Group of Ministers) have formulated Gas Utilization Policy for distribution and utilization of domestic gas in the country and have allocated priority for KG D6 gas allocation to existing gas based / liquid based stations, connected with gas pipelines. For better utilization of generation capacities, presently running on liquid or under- utilized, it is necessary to connect them preferably as a part of trunk/ spur pipeline network. Existing Gas Pipelines The present gas pipeline infrastructure in the county is around 12000 km with design capacity of around 283 MMSCMD. The existing main trunk pipelines are as under: (cid:2) GAIL: Owns and operates around 8000 km pipelines including spur lines (mainly HVJ-GREP-DVPL including DVPL-GREP up gradation and DUPL-DPPL) with design capacity around 150 MMSCMD. (cid:2) Reliance Gas Transportation Infrastructure Ltd. (RGTIL) : Owns and operates around 1400 km long East - West Pipeline (EWPL) - (Kakinada-Hyderabad-Uran-Ahmedabad) with design capacity of 80 MMSCMD. (cid:2) Other major regional players: (cid:2) Gujurat State Petronet Ltd (GSPL) :Owns & operates ~ 1200 km pipelines with design capacity of 40 MMSCMD. (cid:2) Assam Gas Company Ltd (AGCL) : Owns & operates ~ 500 km pipelines with design capacity of 8 MMSCMD. (cid:2) Authorized Gas Pipelines: Ministry of Petroleum and Natural Gas in 2007 authorized following nine new trunk pipelines with total length of approximately 8700 km with design capacity of about 209 MMSCMD. (A) GAIL : - Dadri-Bawana-Nangal (600 ksm) - Chainsa-Jhajjar-Hissar (400 kms) - Jagdishpur-Haldia (2000 kms) - Dabhol-Bangalore (1400 kms) - Kochi-Kanjirrkod-Bangalore (1100 kms) (B) RGTIL : - Kakinada-Haldia (928 kms) - Kakinada-Chennai (577 kms) - Chennai-Bangalore-Mangalore (538 kms) - Chennai-Tuticorin (585 kms) These pipelines are under different stages of development. Establishment of PNGRB: The Petroleum and Natural Gas Regulatory Board (PNGRB) Act 2006 provides for the establishment of an independent regulatory board (PNGRB) as a downstream regulator to regulate the activities of428 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] companies related to refining, processing, storage, transportation, distribution, marketing and sale of petroleum, petroleum products and natural gas and City Gas Distribution (CGD). The board has been established and started functioning w.e.f. June 2007. The PNGRB have formulated several regulations pertaining to gas transportation. PNGRB is authorising entities for laying pipeline on basis of competitive bidding through EOI route. PNGRB has received 06 EOIs for setting up of additional gas pipelines. These are (as per PNGRB website): (i) Mallavaram (A.P.) – Vijaipur (M.P.) – Bhilwara (Rajasthan) (ii) Mehasana (Gujarat) to Bhatinda (Punjab) via Jaipur (Rajasthan) (iii) Bhatinda (Punjab) to Srinagar (J & K) (iv) Surat to Paradip (v) Durgapur to Kolkata (vi) Kakinada to Srikakulam PORTS Keeping in view the estimated capacity addition of about 88,000 MW during 12th Plan, the coal quantity to be imported by the end of 12th plan works out to about 230 MT including the requirement for power plants that would be operating completely on imported coal. Based on the Maritime Agenda for Ports, issued by the Ministry of Shipping, major and non major ports together are targeted to handle 476.04 Million Tonnes of Thermal and Coking coal combined by the end of 12th Plan. Moreover in order to augment the capacity and enhance productivity levels at major ports, several initiatives are being taken by the Ministry of Shipping including modernisation of port infrastructure, construction of new berths/ terminals, expansion/ up-gradation projects for berths and dredging, installation of new and modern equipment, mechanisation of cargo handling operations and automation through computer aided systems. However improving / augmenting rail and road connectivity especially last mile connectivity will need special attention particularly as it involves close coordination and interface between Roads, Railways and Port Authorities. Suggestions/ Recommendations (cid:1) Adequate coal unloading arrangement at Ports to be ensured to handle imported and domestic coal required for power stations (approximately 150 MT). (cid:1) On the East Coast, coal handling facilities to be augmented at Paradip and Vizag Ports. This will be necessary to evacuate coal from mines in Orissa as rail routes are congested. (cid:1) All major and important minor ports should be mechanised by augmenting crane capacities, silos, conveyors & wagon tipplers. (cid:1) Draft at various ports to be increased to handle Panamax or Capsize vessels. (cid:1) RO-RO berths should be created atleast in two major ports namely Kandla on the west coast and Paradip on the east coast for unloading ODCs. (cid:1) Road connectivity to ports to handle ODCs has to be ensured. 9.5 MANPOWER REQUIREMENT Trained manpower is an essential prerequisite for the rapid development of all areas of the Power Sector. This Sector is poised for massive capacity addition and the industry should take steps to increase production and project execution capacity to meet the targets of over 1,00,000 MW (including captive & renewable) during the 12th Plan. Manpower development including training facilities shall be commensurate with this large capacity addition requirement. 9.5.1 Norms for manpower requirement Norms have been adopted to assess the manpower requirement for project construction, execution and O&M of generation projects during the 12th Plan. Details are as follows: For construction of new plants Hydro - 10 persons per MW¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 429 Thermal – 8 persons per MW Nuclear – 8 persons per MW Project execution period Hydro - 72 months Thermal - 36 months Nuclear - 72 months For operation and maintenance of generation projects Hydro - 1.9 persons per MW Thermal - 1.1 persons per MW Nuclear - 1.9 persons per MW 9.5.2 Manpower requirement during 12th Plan The targeted capacity addition during the 12th Plan is presently pegged at around 88,000 MW. It has been estimated that about 4.54 Lakh additional personnel in O&M and 6.55 Lakh in construction of generation, Transmission & distribution are required. The personnel engaged in construction area in the Power sector during 11th Plan would be adequate to meet the requirement in construction during 12th Plan. The category-wise break-up of the additional Manpower Requirement during 12th plan is shown in Table 9.10 below: Table -9.10 Category operation & Construction Total maintenance Engineers 42000 36000 78000 Supervisors 78000 49000 127000 Skilled Workers 63000 109000 172000 Semi-skilled workers 68000 121000 189000 Unskilled workers 78000 219000 297000 Non-tech 127000 121000 248000 Total 454000 655000 1109000 Critical ITI trades for power industry are as follows: Table 9.11 Trade Number of units Annual intake Fitter 8,531 1,36,496 Electrician 8,221 1,31,536 Welder 1,068 17,088 Wireman 2,005 32,080 Turner 1,773 28,368 Mechanic 1,157 18,512 Carpenter 475 7,600 Sheet metal 285 4,560 Mason 165 2,640 Tool & die maker 38 608 Plumber 448 7,168 Total 24,166 3,86,656 Source: Director General (Employment & Training) 40,000 is the average annual requirement estimate In view of the huge requirement of trained manpower during 12th Plan and huge training load and advancing technologies emerging in the Power Sector, it is recommended to adopt modern and scientific training methodologies and create an infrastructure accordingly including course materials and training aids. This will result in cost and time effective training and help in further bridging the training load-infrastructure gap. Some of such training methodologies are described below:430 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] • Through Simulators of different types suiting to the organizational/trainee’s needs (i.e. through area simulator, compact simulator, generic simulator or full-scope replica simulator etc.) • Through plant specific on-plant, on-site training at power station/sub station, manufacturer’s site. • Through personnel computer based self-learning package system. • Through video /CDs/ films. • Through mock up plants, models, rigs, zigs line-up panels etc. • Through correspondence courses and distant learning packages. • Maintenance skill development through ‘Hands-on’ training on actual plants, or obsolete/ redundant equipment. • Through case studies. • Arranging training through local languages as medium of instruction and developing course material in these languages. 9.6 FUND REQUIREMENT The requirement of funds for Generation projects has been assessed based on the capacity addition of about 88,000 MW during the 12th Plan. The fund requirement has been assessed based on assumption of cost per MW for various generation projects based on the costs of past projects. The details of assumptions for estimation of cost of generation projects are given as Annexure 9.1. Based on the above and the likely 12th Plan Capacity addition of about 88,000 MW, the likely fund requirement during the 12th Plan has been assessed as 4,13,870 crs for generation projects. In addition, funds are also required during the 12th Plan for advance action for 13th Plan projects which has been assessed as 2,72,582 crs. Details of total fund requirement for capacity addition during 12th plan are as follows: Table 9.12 Total Fund Requirement for Capacity Addition during 12th Plan Fund requirement in Rs. Crores 12th Plan Capacity of about 88,000 MW 4,13,870 Advance action for 13th Plan Projects 2,72,582 Total fund requirement for Generation projects during 12th Plan 6,86,452 The total fund requirement for Generation Projects during the 12th Plan is 6,86,452 Crs. This fund requirement does not include funds required for R&M of power plants, Captive and Renewable capacity additions Matching funds are also required for transmission & Distribution sector. ----+++----¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 431 Annexure 9.1 ASSUMPTIONS FOR ESTIMATION OF COST OF PROJECTS Assumptions for estimating cost of power projects (Figures in Rs. Crore per MW) S.No. Type of Generation project Cost 1 Thermal generation projects 6 2 Hydro generation projects 8 3 Nuclear projects 10 4 Captive 5 5 Solar 13 6 Wind 6 7 Other RES 5 *The above costs are based on the FY 2011-12 price levels # 10% higher costs have been assumed for projects in NE region.432 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Chapter 10 INTEGRATED PLANNING BY THE STATES (I) BACKGROUND Government of India has taken a number of Initiatives to adopt a more pro-active, market oriented approach to rid the Power Sector of the problems being faced by it. These range from changing the structure of the Power Utilities to the operating environment and the Legislative and Regulatory framework governing the Power Sector. Most significant changes have been the unbundling of the vertically integrated business of generation, transmission & distribution and the entry of private sector in power generation, transmission & distribution. These Initiatives are expected to set the stage for a quantum jump in the capacity addition programme and also making electricity available to all including rural households. The Electricity Act 2003 envisages a strong push to the structural reforms, de-licensing, thrust on rural electrification, incentives to reforming States and importantly mandatory metering with stronger provisions for punishment for theft of electricity. The National Electricity Policy and the Tariff Policy further provide guidelines for the development and operation of the Power Sector within the ambit of the Electricity Act. The erstwhile State Electricity Boards have been unbundled into separate generation, transmission and distribution companies. While this Initiative is expected to be instrumental in making the power business economically viable, the States have a very important role to play in carrying out integrated planning of the entire electricity chain from generation to the ultimate consumer such that all the systems are adequate and are set up within a matching timeframe. This Chapter outlines the planning to be undertaken by each state in a cohesive manner. 10.1 CREATION OF STATE ELECTRICITY BOARD The beginning of power supply industry in the country was through private entrepreneurial initiative and as a principle the generating plants were established close to load centres. The emergence of grid systems to connect and operate the isolated generating units to improve economics and reliability of supply was recognized during the forties. A comprehensive legislation to restructure the power supply industry was made with the enactment of the Electricity Supply Act 1948. This Act provided for the creation of State Electricity Boards (SEB) with the responsibility of promoting generation and supply in an efficient and economic manner and extension of power supply facilities in the country. The role of Private Sector for development of Power at this stage was minimal with private entrepreneurs only in Ahmedabad, Calcutta and Bombay being in the field. 10.2 ELECTRICITY ACT 2003 AND NATIONAL ELECTRICITY POLICY Enactment of the Electricity Act, 2003 was aimed at addressing the problems which were plaguing the Power Sector in the past. The Act envisages development of the Power Sector in a market driven environment, keeping in view the interest of the consumers as well as of the suppliers of power. Generation has been delicensed and Open access in transmission and distribution has been stipulated. The National Electricity Policy was formulated to act as a functional lever to facilitate implementation of the Act towards providing the required thrust to the Power Sector. Section 3(4) of the Electricity Act 2003 mandates CEA to prepare the National Electricity Plan in accordance with the National Electricity Policy. The Plan is expected to function as a facilitating lever for implementation of the Electricity Act 2003 in keeping with its true spirit. The draft Plan prepared by CEA is circulated to all the Stakeholders as well as it is put up on the CEA Website inviting comments of all. The Plan is finalised based on comments received, as considered appropriate. The National Electricity Plan is prepared to serve as a road map towards optimum growth of the Power Sector. It is based on an approach of integrated resource planning so as to optimally utilize the resources including investments already made. The Plan is evolved as a result of detailed studies carried out using sophisticated generation planning software models available with CEA. The Plan contains project-wise details of capacity addition as well as the fuel type of each project. Generation as well as Transmission aspects are covered by the Plan.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 433 10.3 RESTRUCTURING OF THE POWER SECTOR Creation of the State Electricity Boards (SEBS) in the fifties was extremely beneficial for the development of the Power Sector. Each State developed its integrated system from the power plants to the transmission and the distribution network. This facilitated the reach of electricity to a wide spatially distributed area of the country. However with time, the performance of the SEBs deteriorated and they gradually became financially unviable due to mounting losses. This adversely affected their developmental plans and the States started facing increasing power deficits. This prompted the Government to unbundled the States into separate Generation, Transmission and Distribution Corporations, each being a separate financial entity. Regulatory Commissions were also set up in each State under whose regulatory oversight the operation and development of each State took place. The main problem experienced after unbundling of the SEBs is that since in each State generation, transmission and distribution are under separate Corporations, no coordinated short term or long term planning is being done in most of the States. This is expected to be extremely detrimental to the overall power scenario in the country. Earlier, the development in each State was in accordance with the planning exercise being done by CEA. However subsequent to the Electricity Act 2003, the developer of a power plant does not require any clearance from CEA for setting up a thermal or a hydro power plant below a certain financial limit. Therefore most of the States do not have a regular planning philosophy or developmental Plans for their system. 10.4 NEED FOR COORDINATED PLANNING IN STATES Each State needs to have a coordinated planning in respect of their generation, transmission and distribution system. Short term and Long term Plans need to be evolved for each State. Some of the specific reasons for this are as follows: a) Each State has a varying Load dispatch curve which has to be met by setting up base load as well as peaking power plants. As such each State is expected to be responsible for setting up adequate base load as well as peaking generation capacity, even after formation of National Grid. It is therefore necessary for each State to carry out short term as well as long term planning. Long term Plans covering a period of 10 years are very important since some power projects specially hydro projects are long gestation ones. Also the planning process needs to ensure that , at potential sites for storage type of hydro projects these projects are built rather than run of the river projects as these provide peaking power. b) Adequate transmission network needs to be set up in the same time frame as the associated generation project. Also since the Act and the Policy provides for Open Access, sufficient transmission capacity needs to be created to ensure open access to all consumers as required. c) Distribution, even though a State subject, needs a coordinated planning commensurate with the generation and the transmission system. Since the Act provides very stringently for reliable power, planning may be carried out for the distribution system also. As per the Electricity Act, 2003 it is the prime responsibility of the Distribution Company to develop their distribution network by carrying out short term and long term studies to optimize the system network to provide least cost solution, to ensure voltage at various nodes within stipulated limits as per IE Rules, Minimise energy losses in the distribution network, Improve quality and reliability of power supply etc. Because of multiple agencies in one supply area, there is a need to have one single agency to ensure integrated planning for fulfilling the above objectives This agency would coordinate with the developers of generation, transmission, distribution and other agencies if any. This would facilitate development of a robust, most economical and reliable system. d) Modern information technology systems need to be implemented by the distribution utilities on a priority basis, after considering cost and benefits, to facilitate creation of network information and customer data base which will help in management of load, improvement in quality, detection of theft and tampering, customer information and prompt and correct billing and collection. (II) PROPOSAL AND RECOMMENDATION FOR SINGLE AGENCY IN EACH STATE FOR INTEGRATED PLANNING With a view to facilitate coordinated planning in each State covering all aspects of the power system, it is necessary to have a Single Nodal Agency in each State for this purpose. This Agency shall be designated by each State. It may be effective for the energy department of the State to perform this function. As per the Act, STU has been designated for planning in the respective States. CEA shall be the consultant to this Nodal Agency as it has the requisite expertise for planning and is equipped with the suitable software planning tools for this purpose.434 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Chapter 11 FUEL REQUIREMENT 11.0 INTRODUCTION Fuel for the power project is the main input required to be tied up before implementation of power projects. Coal is the main fuel for the Indian Power Sector and it is expected that coal will continue to dominate the power sector in the next few Plans as well. An important aspect which therefore needs to be considered is the availability of adequate coal to fuel the generation of power. Inadequate availability of coal will result in stranding of generation capacity causing wastage of sunken capital expenditure as well as the perpetuation of power deficit conditions in the country. Many existing power plants are experiencing generation loss due to non availability of adequate coal. Import of coal is therefore inevitable for power generation. The timely supply of all key inputs including fuel would ensure timely completion of the project and therefore avert detrimental implications of cost and time overruns in case the power project is delayed. This Chapter broadly deals with a review of fuel availability during the 11th Plan, an assessment of requirement of fuel for 12th Plan & indicative requirement for 13th Plan as well as critical issues which need to be addressed/ constraints being experienced in the coal sector. This would give sufficient inputs to other Ministries and to the industry to enable them to take advance action and plan their production targets etc. According to the requirement of the Power Sector. 11.1 REQUIREMENT OF COAL 11.1.1 Coal is the mainstay of India’s energy sector and accounts for over 50% of primary commercial energy supply. The total power generation capacity ( Utility) of the country is about 1,99,877 MW as on 31.03.2012, out of which about 1,12,022 MW (56%) is coal fired. Of the total power generated in the country, 70 % comes from coal based thermal power stations even though they constitute only 56% of the total installed capacity. The Plant Load Factor (PLF) of the thermal power stations in the country has been improving steadily over the years in view of various initiatives being taken by the Ministry of Power. The PLF has increased from 57.1% in 1992-93 to 73.32% in 2011-12. This has increased the demand of coal per MW of installed capacity. However, due to fuel constraints, PLF of coal based power plants is declining. The growing gap between the demand and the domestic supply of coal has made it imperative to augment domestic production both from public sector and private sector and expedite the reform process for realizing efficiency gains through increased competition in the sector during the 11th Plan. 11.1.2 The Government has introduced the New Coal Distribution Policy (NCDP) that assures supplies at pre- determined prices to some categories of consumers and reintroduces e-auctions to encourage a vibrant market for the commodity. The Main Features of the Policy which is effective from 1st April 2009 are as follows: – 100% Normative Requirement of coal would be considered for supply to Power Utilities – Supply of coal through commercially enforceable Fuel Supply Agreements ( FSAs) at notified prices by CIL. – 10% of annual production of CIL to be offered through e-auction for consumers who are not able to source coal through available institutional mechanism. – FSAs to indicate Annual Contracted Quantities (ACQ) of coal to Power Utilities by coal companies during entire year. Incentive and penalty clauses incorporated in FSAs. Signing of Fuel Supply Agreement (FSA) for the Units Commissioned after 31st March, 2009: For thermal power plants commissioned before 31st March, 2009, FSAs were signed with a trigger value of 90% of the Annual Contracted Quantity (ACQ). FSAs for thermal power plants commissioned after 31st March, 2009 have not been signed , primarily due to CIL’s insistence for (a) keeping the assured supply as low as 50% of LOA and (b) signing the FSA for 5 years. LOA for new power plants generally being commensurate with 85% PLF, this will tantamount to assured supply of coal corresponding to 42.5% for 5 years for generating stations having PPA for supply of power for 25 years. MoP has taken up the matter with Ministry of Coal for signing of FSAs for projects commissioned after 31st March, 2009. The concept of pooling of Price is also being pursued.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 435 11.1.3 Coal Stocking Norms: Coal stocking norms for power stations as fixed by a Committee headed by Secretary, Planning Commission depending on the distance of the power plant from the pit-head as per details given below: • Pit-head Station 15 days’ stock • Upto 500 Kms. Away from Coal mine 20 days’ stock • Upto 1000 Kms. Away from Coal mine 25 days’ stock • Beyond 1000 Kms. Away from Coal mine 30 days’ stock 11.1.4 Import of coal In the past, Power Utilities were advised to import coal to maintain the stipulations of Ministry of Environment and Forest regarding use of coal of less than 34% ash content and also to occasionally supplement the coal from indigenous sources. The quantity of coal imported by the power stations during the previous years is as given below:- (In Million Tonnes) Year Target Actual 2004-05 10.0 4.5 2005-06 13.5 10.4 2006-07 20.0 9.7 2007-08 12.0 10.2 2008-09 20.0 16.1 2009-10 28.7 24.6 2010-11 47.0 30.5 2011-12 55.0 44.9 As per the demand-supply analysis of domestic coal, done above, import of non-coking coal is expected to increase by the end of 12th Plan period is needed to meet the demand of power sector. The present port capacity can handle around 55 MT of thermal coal and would need to be augmented to meet the rising coal import forecasted. Further, imported coal can be used as a blend with the domestic coal to substitute requirement of washed coal, which is required for Power Stations to adhere with MoEF’s stipulation. Such a situation would also ease the problem of handling washery rejects. However, high cost of imported coal will have adverse impact on the power tariff. 11.1.5 Capacity Addition Programme and Coal Requirement Ensuring adequate coal supply to existing/newly commissioned power plants has been a major concern. The coal supply position to Power Sector during the last two years i.e.2010-11 & 2011-12 is given below: (iii) Coal Supply position for the period 2010-11 & 2011-12 Source wise programme and receipt of coal for year 2010-11 & 2011-12 are as given below: April, 2010- March 2011 April 2011- March,2012 Growth in Receipt Source Program Receipt % Program Receipt % (%) CIL 335 302.8 90 347 310.4 90 2.9 SCCL 30 33.6 112 32 35.4 110 5.4 CAPTIVE 20 21.4 107 22 22.4 84 5.6 IMPORT 47 30.5 65 55 44.9 82 47.2 E auction 6.2 TOTAL 432 388.3 90 456 419.3 91 8.0436 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] (iv) Coal Demand and Availability Position during the Year 2012-13: For the year 2012-13, a coal based capacity addition programme of around 13,735 MW is envisaged. The coal requirement for the indigenous coal based thermal units vis-a-vis coal availability from indigenous sources and coal requirement for plants designed on imported coal is detailed below: S.No. Description 2012-13 1.1 Coal requirement for plants designed on indigenous Coal 476 1.2 Coal requirement for plants designed on imported coal 24 1.3 Total 500 2. Coal Availability from indigenous sources 2.1 From CIL Sources 347 2.2 From SCCL 35 2.3 From captive Mines 25 2.4 Total coal availability from indigenous sources 407 3. Shortfall of indigenous coal (1.1 – 2.4) 69 4.1 Coal to be imported to meet the shortfall for plants designed on indigenous 46 coal 4.2 Coal requirement for plants designed on imported coal 24 From the above, it may be seen that there is a shortfall of 69 MT in the availability of indigenous coal. In order to bridge this shortfall, power utilities are required to import 46 MT of imported coal. Apart from this, 24 MT of imported coal is required for power stations designed to run on imported coal. (iii) 12th PLAN Considering 54,964 MW actual capacity additions in 11th Plan, four Scenarios for capacity addition during 12th Plan have been worked out based on 18th EPS Demand projections. As per the Base case, the details of capacity addition requirement during 12th Plan is as follows:— Exhibit 11.1 TYPE WISE CAPACITY ADDITIONS DURING 12th PLAN (Figs in MW) TYPE 12thPlan Capacity (With 18th EPS demand + 5% S.R.) (MW) Hydro 10,897 Thermal 70,903 Coal 67,843 Lignite 520 Gas 2,540 Nuclear 5,300 TOTAL 87,100 Wind 11,000 Solar 4,000 Other RES 3,500 TOTAL (RES) 18,500 Retirement During 12th Plan 4,000 Coal demand and availability during 12th plan¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 437 Availability of coal for the coal based thermal power stations is a matter of serious concern. Although thrust is being accorded to maximize generation from other conventional and non-conventional sources, coal based generation is likely to be the main stay of electricity generation for 12th and 13th Plan to support the targeted GDP growth envisaged by the Government. The coal based capacity addition programme is worked out after taking into account the electricity generation availability from other sources i.e. Hydro, Nuclear, Gas, Lignite and renewable sources. In order to meet this generation requirement, coal requirement (at SPCC 0.72 Kcal/ Kg) works out to around 842MT. Against the requirement of 842 MT, 54 MT coal is to be imported by Thermal Power Stations designed on imported coal. SCCL has confirmed a coal availability of 35 MT and around 100 MT coal is expected to be available from captive coal blocks. Thus, 788 MT coal needs to be made available by CIL against which they have committed to supply 477 MT. Thus, CIL is to be impressed upon for formulating exigency plan to enhance their production to meet the requirement the power stations. The availability/shortfall of indigenous coal is detailed below: (i) Coal requirement during the year 2016-17 = 842 MT (ii) Coal availability from : (a) CIL = 477 MT (b) SCCL = 35 MT (c) Captive Blocks allocated to Power Utilities = 100 MT Total, coal availability = 612 MT (d) Coal to be imported by TPSs designed on imported coal 54 MT Shortfall = 176 MT In order to bridge the above gap between demand and coal availability as referred above, Power Utilities are expected to import around 117 MT to meet shortage in coal supply from CIL. This quantity of imported coal would be in addition to 54 MT coal likely to be imported by Thermal Power Stations designed on imported coal. Therefore, the total quantity of coal expected to be imported is about 171 MT. 11.1.6 Issues/Constraints in making coal available to power stations Timely availability of adequate coal is extremely crucial for maximizing generation from the power plants. In addition to tapping fuel source or organizing its availability, it is also essential to create the infrastructure to facilitate fuel to reach the intended destination. Therefore development of mines/ ports and requisite transportation facilities commensurate with the completion of the projects is very necessary. The gestation period in the development of mines and even transport facilities are in some cases longer than the gestation period for setting up of thermal power stations. It is therefore imperative for the Power Sector to make its prospective coal requirement, over a long time horizon, known to the Ministry of Coal, Railways and port authorities to enable them to undertake co-ordinated development of coal mines and transport infrastructure with the coming up of thermal power stations. 11.2 COAL WASHERIES IN INDIA In India, 20 percent of coal produced is washed as against a global average of 50 percent. Coking coal preparation has long been in operation in India but recently, the trend has been shifted to washing of non coking coal due to environmental and efficiency concerns. The long distance transportation of coal via land routes offer an ideal opportunity for coal washing in India because of economic benefits. Though coal washery increases the overall cost of coal, but the benefits accrued in terms of saving in transportation, O&M cost and efficiency are sustained. The quality of Run of Mine (ROM) coal from Indian mines is continuously decreasing due to the geographical pattern of coal seams in coal bed. This very nature of coal quality from coal seams demand coal washing, providing bullish market opportunity for national and international players to enter the lucrative washery segment of Indian coal sector. The guidelines set by MOEF to use coal containing ash not more than 34% for power plants situated at a distance more than 1000km has changed the scenario completely. Out of the projected capacity addition during the 11th plan, about 27% of planned capacity would be located at more than 1000km. As the pressure from environment brigade is mounting, MOEF is likely to reduce the required norms for using 34% washed coal from beyond 1000 Km to a distance of 500km. This will open a huge opportunity for private players to enter into the coal washing segment of India. Currently, India has more than 100 million tonnes of non coking coal washing capacity.438 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] CIL has been in the fore front in developing coal Washeries but due to man power constraints coupled with cost of the operation, it has decided to outsource this operation to private players in BOM (Build, Operate and Maintain) basis. It has planned for international competitive bidding to develop 22 coal Washeries in different parts of India. 66 players have evinced their interest to develop coal Washeries for the first phase (11 coal Washeries) of competitive bidding. It has earmarked a whopping Rs 5000 crores for coal washery development to increase the capacity from 120MTPA to 250MTPA in 4 years of time. Strategies for improvement of domestic coal production (cid:3) Use of State-of-the art technology for improvement in efficiency & productivity in coal mines and related Policy changes: To facilitate adoption of State-of-the-art International coal mining technology, high output – high efficiency HEMM, new technology in Mine Safety, etc., further liberalization of import policies by the Indian government is needed. In addition to it, Coal Sector may be given “Infrastructure Status” with ‘Tax Holiday’ & Duty exemptions. Alternatively, the concept of Mega Project may be introduced in the coal sector also by according Mega Status to Coal Mines of production level of 5 MTPA or above and providing benefits of tax/duty concessions. (cid:3) R&R Policy for Coal Mining Industry: Resettlement and rehabilitation policy needs to be evolved to protect the livelihood of project-affected people. To bring in clarity and uniformity – Nationwide, a uniform R&R policy needs to be formulated which should be adopted by all coal producing companies in India. With increased use of state-of-the-art technology and sophistication, more automation & computer control in coal mining operation, less manpower deployment will be required in the new mines and thus there will be less job opportunities. So, while formulating National R&R policies for coal mining, this aspect may also be looked into and suitable alternatives, beneficial for upliftment of livelihood of the displaced persons, may be agreed upon. Moreover, in order to avoid erosion of land compensation amount by the land oustees in a short span, a suitable mechanism like Interest-carrying deposits of land compensation amount – part or full in a suitable fund created by the mine owner, issuance of Bonds, etc., may be explored. Unlike other industries, coal mining industry does not require establishment of permanent fixtures over the entire acquired land, hence the some of the land, after mining, can be used for cultivation with proper development like earth-filling & putting in of fertilizers, etc. R&R Policy for Coal Mining may look into another dimension like taking of agricultural land from local people on term-lease & returning of land to the extent possible in an area where mining operation is completed after proper development of that land so that cultivation can again be done. The Agency/Organization, engaged in coal mining in a particular block, will remain responsible for development & return of the land. (cid:3) Expeditious clearances for development of Coal Mining Projects: Govt. support in terms of simplified procedures and single-window approach for granting of various clearances and permissions, including environmental clearance, faster investment decisions, closer coordination between the Centre and the State Govt. agencies etc. would be needed for speedier execution of coal mining projects. (cid:3) Captive Coal Mining Coal production, modernization and efficiency improvement would depend on the level of competition in the industry. Mobilization of the requisite investment in coal mining also reinforces the need to induct more players from both the public and private sectors. The introduction of new players in the coal sector would be beneficial to the sector as a whole and is considered essential. It would also be essential to gradually increase the production through captive mining of 40 to 50 % of the total production of the country. Reputed International Coal Mining Companies may be encouraged to come to India for development & operation of coal mines which will facilitate introduction of latest mining technology & mine safety measures (cid:3) State Governments must become partners in development of coal i. There is a need to incentivise states from mining operation. ii. Before the allocation of blocks, concerned Sate Govt. may be consulted with and made party to it, as mining of coal in their States would directly and indirectly benefit that particular state.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 439 iii. In mineral rich states, a separate cell may be made operational for land acquisition process, processing of proposal related to environment and forest clearance (Single window approach through MOU), etc. iv. Coal-bearing states, in addition to Royalty, may be incentivised for their co-operation in start of mining in a time-bound manner. (cid:3) Special Task Force for monitoring the progress of project implementation A special Task Force may be in place for periodic review & monitoring of the progress of coal mining projects. It will prevent any slippage, help in clearances/approvals and ensure timely commencement of production of coal. Such monitoring & status reporting must be done in a transparent manner and in electronic form. (cid:3) To ensure adequate exploration of coal mines and reliability of estimates of extractable reserves It is needed to speed up our efforts to accelerate the pace of regional surveys and drilling to complete the comprehensive coal resource assessment exercise. Therefore, there is a need to enrol more specialist agencies to conduct exploration of blocks and prepare GRs, so that production from blocks can start in a timely manner. (cid:3) Commercial coal mining by private sector The need to provide adequate investments in coal mines, conserve coal reserves ensure mine safety and environmental protection and to assure decent living standard for the coal labour was the basic reason for nationalization of coal mines during 1971 and 1973. In this regard, Coal Mines (Nationalisation) Amendment Bill, 2000 is a step towards promoting liberalisation in the coal sector. It will also address the need for augmenting coal production in the country through wider participation of private coal mining companies. The proposed amendment bill is pending for long time to be expedited Coal price pooling: The concept of pooling of price of domestic and imported coal is necessitated due to the fact that the production of domestic coal is not increasing commensurate with the requirement of coal for power stations which are existing and are being planned, based on domestic coal. Most of the new Power Utilities would be required to import coal to bridge the gap between their requirement and availability of domestic coal. Coal for thermal power plants is predominantly being imported from countries like Australia and Indonesia which has a high Calorific Value ranging from 6000-6500 Kcal/ Kg with low ash content. Major ports for import are Mundra, Vizag, Gangavaram, Ennore, Tuticorin, Pipavav etc. Transportation cost from these ports to power plant site which are not in the coastal region or not in the state where these ports are located may be as high as Rs. 1500 per tonne. Coal for the Power Utilities in the country is being transported by Indian Railways and most of their routes are already facing congestion due to heavy movement of traffic. There is cross movement of coal from port to Power Utilities located in Central India and from domestic coal mines to Power Utilities located in coastal or adjoining areas. This is causing duplicate movement of coal rakes and causing unnecessary expenditure on freight and avoidable overloading of Indian Railways network and creating other logistic problem. Transporting coal from such a long distance also increases transit loss thereby reflecting in the bottom line of generating utilities. Since the fuel price is generally pass through in the tariff, higher freight charges will certainly increase the tariff resulting in higher cost of electricity to the consumers. The situation thus needs to be rationalized to the extent feasible. A solution to this problem could be the allocation of coal to Power Utilities from the nearby coal source to the extent possible to minimize transportation cost. Power Utilities located in coastal areas may be asked to use larger chunk of imported coal being nearest to the port subject to design limitations. Most of the coal mines of Coal India Ltd. are located in Central India giving almost an equal distance of coal transportation from coal mine to a majority of Power Stations. Therefore, the Power Utilities which are at a larger distance from ports may be allocated coal from the mines of Coal India only and be asked to use imported coal only in the case of shortfall to avoid unnecessary double movement of coal rakes. It is accepted fact that the cost of imported coal is higher than domestic coal even after accounting for its higher GCV, at present rate it is almost two and half times costlier than domestic coal on heat value basis. This could be a deterrent to the Power Utilities at coastal areas which would be asked to use a higher chunk of imported coal as it will increase their cost of generation.440 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] A case, therefore, exists for importing coal to bridge the gap between requirement and availability of domestic coal and the cost of the same to be equitably borne by all the power utilities. It may however be mentioned that the concept of pooling cost is to be applicable to power stations designed for domestic coal only. Imported coal based stations and stations linked to dedicated coal blocks are not to be considered in this pooling mechanism. Following categories of power plants may be accorded higher preference for utilizing imported coal (subject to 15% blending with imported coal for existing stations and upto 30% blending for new stations) under the pooling of price concept :— • Coastal power stations • Stations where availability of indigenous coal is a major constraint. • Stations situated at long distances from pithead • Stations which have to comply with MOEF stipulations on ash content. The above are to be prioritized considering the existing coal handling facilities at power stations to the extent possible. Pooled price is to be evaluated based on the heat value (Rs/KCal) of the coal. CIL shall be responsible for importing coal and levying the pooled price on the various power utilities. This is reasonable in view of the fact that the New Coal Distribution Policy stipulates that CIL is responsible for meeting 100% of the normative requirement of coal of the power utilities, and import of coal may be resorted to the extent required. e-Auction of coal As per NCDP, around 10% of total domestic coal production is allowed for e-Auction by CIL. It is to be ensured that before offering 10% quantity, FSA/MOU commitments are met with. The issue of rail connectivity to such mines from where coal for e-auction is sourced should be taken up immediately. Coal Regulator A need is being felt for long to institute an independent regulatory body to regulate the upstream allotment and exploitation of available coal blocks to yield coal, coal bed methane, coal-to-liquid and for in-situ coal gasification. The proposed Regulatory Body, as an interim measure, may approve coal price revisions, ensure supply of coal to the power sector under commercially driven long-term FSAs, facilitate the development of formulae/indices for resetting coal prices under long-term fuel supply agreements, monitor the functioning of the proposed e-auctions, ensure that the price discovery through e-auctions is free of distortions, regulate trading margins, develop a mechanism for adequate quantities of coal imports under long-term contracts to bridge the gap between supply and demand thereby assuring that the e-auctions and consequent price discovery does not take place in a supply constrained market and, finally, create the environment for a competitive coal market to operate. Once a competitive market is developed, the role of Regulator in determining the prices would be to ensure a free and transparent market for coal. The Regulator must ensure that mines are planned, designed and developed in a scientific manner giving due importance to coal conservation thereby maximising percentage of coal recovery from geological blocks. The Regulator must standardise norms of operation, establish benchmarks and ensure that coal companies raise their level of competence to be at par with international standards. The proposed Coal Regulator should also be entrusted with following aspects of coal mining : • Coal Resources Management • Safety, Health, and Employment in coal mines • Prices, Taxes, Royalty, Value Added Tax, Property Tax, and Salary of Workers • Environment Management • Policy-Legal, Public Relations, Statistics, and Dispute Resolution • Recommendation to CIL for issuance of LoAs • Approval of mine plans including mine closure plans • Optimization of current linkages to minimize Rail/Road transportation¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 441 • Oversight role on captive coal block auctions • Dispute resolution-primary forum for : (cid:2) dispute resolution among entities; (cid:2) entities aggrieved due to decisions given by MOC/MOEF relating to mine closure, etc. 11.3 LIGNITE Lignite reserves in the country have been estimated at around 40.9 Billion tonnes, most of which is found in the state of Tamil Nadu. About 82% of the Lignite reserves are located in the State of Tamil Nadu & Pondicherry. At present only a small percentage of the total reserves of lignite have been exploited. Considerable scope remains for the exploitation of the lignite reserves and use of lignite in thermal power stations subject to cost-economics, particularly in the states of Tamil Nadu, Rajasthan and Gujarat having the limitations of transportation of coal to these regions. State-wise distribution of Lignite resources, Lignite Demand & Production Plan by M/s. Neyveli Lignite Corporation Ltd. (NLC) and Lignite Demand & Production Plan by State Electricity Board are shown in Table-11.2 to 11.3 : TABLE–11.1 State-wise Lignite Reserves State Total[MT] Tamil Nadu 33309.53 Rajasthan 4835.29 Gujarat 2722.05 Jammu & Kashmir 27.55 Others (Kerala, West Bengal) 11.44 Total 40905.86 TABLE -11.2 Lignite Demand & Production Plan by M/s. Neyveli Lignite Corporation Ltd. (NLC) Item 2012-13 2013-14 2014-15 2015-16 2016-17 12th plan Demand (MT) 25.60 26.12 25.91 25.37 27.26 130.27 Production (MT) 26.01 26.01 26.01 26.01 27.29 131.33 Demand-Production 0.41 -0.11 0.10 0.64 0.02 1.05 Gap (MT) Brief year-wise anticipated demand & production plan of Lignite by other State Electricity Boards and private companies (other than NLC) during 12th five year plan period are shown below (TABLE 11.3). Table 11.3 Lignite Demand & Production Plan by State Electricity Board Item 2012-13 2013-14 2014-15 2015-16 2016-17 12th plan Rajasthan Rajya Vidyut Utpadan Nigam Limited Demand(MT) 8.4 8.4 10.5 10.7 10.7 48.7 Production (MT) 5.4 6.1 10.6 13.1 13.1 48.3 Demand-Production Gap (MT) -3 -2.3 0.1 2.4 2.4 -0.4 Gujarat Industries Power Company Ltd. Demand (MT) 3.6 3.6 3.6 8.1 8.1 27.0 Production (MT) 3.6 4.2 5 8.4 8.4 29.6 Demand-Production Gap (MT) 0 0.6 1.4 0.3 0.3 1.4 (cid:1) Immediate steps needed to augment lignite production considering large reserves of lignite in the country. The technology issues for efficient utilization of lignite resources need to be addressed.442 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 11.4 NATURAL GAS (i) With only one carbon and four hydrogen atoms per molecule, Natural Gas has the lowest carbon to hydrogen ratio, hence it burns completely, making it the cleanest of fossil fuels. Natural gas satisfies most of the requirements for fuel in a modern day industrial society; being efficient, non-polluting and relatively economical. The periodic uncertainties and volatility in both the price and supply of oil have also helped Natural Gas emerge as a preferred fuel in the energy basket across the countries. The demand of Natural Gas has sharply increased in the last two decades at the global level. In India, the natural gas sector has gained importance particularly over the last decade and being termed as the Fuel of the 21st Century. The demand of Natural Gas in power sector has ramped up but the supply is not keeping pace with demand. (ii)Supply of Gas to Gas based power plants: The production and supply of gas had not been keeping pace with the growing demand of gas in the country, including for that of power sector. Supply of gas to gas based power plants during last few years had been as under: TABLE 11.4 Sl. Years Capacity at the Gas Required Aver. Gas Supplied Shortfall No. end of year (MMSCMD) (MMSCMD) (MMSCMD) (MW) (1) (2) (3) (4) (5) (6)=(4)-(5) 1 2000-01 9028.70 44.54 24.40 20.14 2 2001-02 9432.90 46.31 24.33 21.98 3 2002-03 9949.00 48.26 25.12 23.14 4 2003-04 10,154.90 49.25 25.62 23.63 5 2004-05 10,224.90 49.73 30.70 19.03 6 2005-06 10,919.62 53.38 35.37 18.01 7 2006-07 12,444.42 61.18 35.10 26.08 8 2007-08 13,408.92 65.67 38.14 27.53 9 2008-09 13,599.62 66.61 37.45 29.16 10 2009-10 15,769.27 78.09 55.45 22.64 11 2010-11 16,639.77 81.42 59.31 22.11 12 2011-12 16,926.27 81.78 55.98 25.80 The production of gas from KG basin (D-6) has started from April 2009. So far, EGoM has allocated gas to the existing power plants based on anticipated production of about 80 MMSCMD from KG-D6 basin. Presently, the production from KG-D6 has come down to about 24 MMSCMD against the firm production of about 60 MMSCMD last year. The gas production from other old fields is also reducing day by day due to depletion of these fields. In view of low availability of domestic gas, existing power plants in the country are getting lesser supply of gas resulting in sub-optimal utilization of these power plants. (iii). Generation loss due to gas shortage There was a shortage in availability of gas. This resulted in loss of generation of power. In case of gas based power stations having provision for the use of alternate fuels, such as naphtha, HSD, generation was augmented by use of such¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 443 fuels. On account of the prevailing high costs of liquid fuels resulting in high cost of generation, the actual generation using these fuels was, however, dependent upon the requirement/acceptance by the beneficiaries. Loss of generation due to shortage in availability of gas as reported to CEA and based on possible operation of power plants at 90% PLF were as under: TABLE 11.5 Generation Loss during the year (BUs) S. Year As reported to CEA by Gas Based Based on possible operation of gas No. Power Stations power plants at 90% PLF 1 2004-05 7.03 23.71 2 2005-06 7.69 23.88 3 2006-07 8.06 26.33 4 2007-08 9.34 31.17 5 2008-09 11.99 33.71 6 2009-10 3.24 25.02 7 2010-11 6.39 28.27 8 2011-12 10.01 32.97 (iv) Steps taken by the Government to overcome the gas shortage Government of India has adopted a multi-pronged strategy to augment gas supplies and bridge the gap between supply and demand for the domestic market. These include:- ● MOP&NG is taking necessary steps to augment production of natural gas from the gas fields/wells. ● MOP&NG is taking necessary steps to increase availability of gas from domestic sources by awarding gas blocks for Exploration & Production (E&P) activities in various sedimentary basins of the country under the New Exploration Licensing Policy (NELP). ● MOP&NG is encouraging import of gas in the form of Liquefied Natural Gas (LNG) and also making efforts for import of gas through international pipelines projects. ● In order to explore and produce new sources of natural gas from coal bearing areas, government has formulated a Coal Bed Methane (CBM) Policy providing attractive fiscal and contractual framework for exploration and production of CBM in the country. ● Government is encouraging Under Ground Coal Gasification (UGCG) and coal liquification and investment by private entrepreneurs in development of these frontier technologies. The notification specifying coal gasification and liquefaction as end-uses has been published in the Gazette of India on 12th July, 2007. ● Implementation of Natural Gas Hydrate Programme (NGHP) for evaluation of hydrate resources and their possible commercial exploitation. ● Efforts are also being made to persuade Government to accord priority to Power Sector while finalizing Gas Utilization Policy of the Government for all future domestic gases. ● While allocation was made for RIL gas from KG basin (D-6), the power sector has been given priority. ● Planning Commission had constituted an Inter-Ministerial Committee on Policy for Pooling of Natural Gas Prices” under the Chairmanship of Saumitra Chaudhary. The committee has submitted its report in August, 2011. The committee has emphasized for increasing share of RLNG in the Power Sector.444 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] (v) Gas Requirement for power sector for 12th Five Year Plan A capacity addition of about 88,000 MW may be required in power sector to meet the growing demand of power during the 12th Five Year Plan. Due to uncertainty in availability of domestic gas, a gas based capacity of only 2540 MW has been considered for the 12th Plan i.e. only those projects in case of which gas is assured from local sources or slippage projects of 11th Plan. However, there is need to plan for additional gas based capacity to the tune of 25,000 MW depending on the availability of gas due to several advantages of gas based plants over coal power plants and also to reduce our emissions. Bulk of this capacity could be developed in next 3 years at the brown field sites or green field sites where land is already available. Presently, about 13,000 MW gas based capacity is under construction and if gas is made available, this capacity can be commissioned in early years of 12th Plan. By the end of the year 2012-13, a substantial coal based capacity is going to be operationalised. The base load requirement by the country will be met from nuclear, pit head coal based generation and partly by non pit-head coal based generation and gas based generation. The intermediate and peak load is required to be met by hydro, non-pit head coal based generation and gas based generation. The wind, solar and small hydro will be “must run” generation and will have to be accommodated by backing down thermal generation. Thus, there is need to promote gas based peaking power plants during 12th Plan onwards. The additional gas requirement for 25,000 MW capacity worked out as under : TABLE 11.6 12th Plan Gas Requirement Particulars Gas capacity in Gas requirement at 70% PLF MW (mmscmd) CCHP Capacity 2,000 8.0 Gas based capacity at the brown field sites or at green 21,000 78.0 field sites Peaking Gas based capacity to be located near large 2,000 4.0 * cities Total 25,000 90.0 * Considering operation for about 5-6 hours daily for peak load and in contingencies Pooling of domestic gas with imported RLNG can be one solution to reduce the shortage of gas. Based on capacity of exiting/proposed LNG terminals in the country, it is felt that additional 40-50 MMSCMD gas can be made available for power sector by 2012-13, which can support about 10,000-12,000 MW additional gas based power plants in the country. LNG being costlier fuel, can be pooled with domestic gas and the common pooled pricing of Natural Gas may be implemented as a policy directive and this will give the much needed impetus to the growth of Gas based generation in the country though it may increase the cost of generation. Due to inherent advantages of gas based generation being green power, the purchase of fixed percentage of power may be made mandatory by the Regulatory Commissions, so as to make the gas based power having higher tariff despatchable. (vi) Total Gas Requirement by Terminal Year of 12th Plan (2016-17) The total gas based installed capacity in the country by the end of 11th Plan (31.03.2012) was 18,381 MW. Based on normative requirement of 4.8 MMSCMD gas per 1000 MW at 90 % PLF, gas requirement for these projects works out to 88 MMSCMD. Gas requirement to promote new gas based capacity of about 25,000 MW during 12th Plan works out to about 90 MMSCMD. Details of gas requirement during terminal year of 12th Plan are summarised below: TABLE 11.7 GAS REQUIREMENT FOR TERMINAL YEAR OF 12TH PLAN (2016-17) * Gas requirement by 11th Plan end (corresponding 88 MMSCMD to existing capacity of 18381 MW as on 31.03.2012) Requirement for 12th Plan Projects (for 25,000 90 MMSCMD MW capacity) Total Gas requirement by 12th Plan end(2016-17) 178 MMSCMD¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 445 11.5 NUCLEAR DEVELOPMENT Expansion of capacity in atomic energy has been limited in the past due to the lack of availability of domestic uranium or the non-availability of supply of international supply of uranium fuel because of the restrictions imposed by the Nuclear Suppliers Group. These restrictions have now been lifted and we can expect a much faster expansion in our nuclear generation capacity. DAE envisages to add 5300 MW in the 12th Plan based on domestic manufacturing capability and additional 18,000 MW during 13th Plan. Despite availability of imported uranium, we must give priority to domestic development of uranium mines. This would enable faster development of the sector. The India’s nuclear power strategy has depended on a three stage development programme consisting of conventional nuclear reactors in the first phase, fast breeder reactors in the second phase and thorium based reactors in the third phase. Successful transition to the third phase will enable us to explore India’s vast thorium resources to become much more energy independent beyond 2050. If we depend on domestic uranium resources, the first phase plants cannot exceed 10,000 MWe from PHWR. A cap of 10,000 MWe would have limited the scale and pace of fast breeder reactor programme and therefore, the production of plutonium which determines the rate at which thorium based nuclear plants can be mobilized. With the lifting of NSG restrictions, import of uranium would enhance the capacity base of our first stage programme. Government has taken steps to import nuclear fuel from NSG members and reactors from the nuclear equipment suppliers to enhance the capacity base in the country. 300 tonnes of Uranium concentrates has already been imported from France. Steps are on to get long term supply of 2,000 tonnes of Uranium pellets from Russian federation in a phased manner. The Fast Breeder Reactor programme is set to be launched with the prototype 500 MWe Fast Breeder reactor plant being built at Kalpakkam, which is likely to be commissioned by March 2012. This is first of its kind project in India and is being implemented by the BHAVINI, a public sector company set up to build this project and all future fast breeder reactor projects. Successful commissioning of this project would go a long way in achieving the three stage development of India’s nuclear power programme for the future. DAE envisages start of work on eight units of indigenous 700 MWe PHWRS in the 11th Plan for commissioning during 13th Plan. Four units have been already approved and work has commenced. These are slated for commissioning in 2016/2017. Work is also planned to be started on LWRs based on international cooperation. The Government has accorded in principle approval for five coastal sites to set up nuclear power parks of 6000 to 10000 MWe capacity based on LWRS with cooperation from Russian Federation, USA and France. A total LWRs capacity of 40,000 MWe is possible to be added progressively by 2032 depending up on the actual start of work on these reactors. The spent fuel of LWRs is planned to be reprocessed and deployed in safeguarded FBRs and additional PHWRs. This would further enhance the FBR capacity in the long term and thus increase the role that nuclear energy can play in long term energy security. without the need for any further import of nuclear fuel. This would significantly increase the role that nuclear energy can play in our long term energy security. The 3rd phase of the 3-phase nuclear energy program, has several complex technological issues to be tackled before our ability to use Thorium. A clear analysis and assessment of the need of additional Manpower, R&D investment and new facilities are called for including the elements to be covered in the remaining 11th plan period. Schedules are of serious concern on this front. ---+++---446 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Chapter 12 ENERGY CONSERVATION AND DEMAND-SIDE MANAGEMENT 12.0 BACKGROUND The gap between electricity supply and demand in terms of both capacity (i.e. MW) and energy (i.e. MWh) has been steadily growing in India. Improving the efficiency with which energy is used to provide economic services meets the dual objectives of promoting sustainable development and of making the economy competitive. Energy Efficiency & Conservation has also assumed enhanced importance with a view to conserve depleting energy resources and Energy Efficiency is being increasingly recognized as the most cost-effective option in the short to medium term to meet the energy requirements of increased economic growth and while minimizing the impact of global climate change. Efficiency options can reduce the need for expensive new electricity generation capacity and, since much of the generation is coal-based, reduce the greenhouse gas (GHG) emissions from energy production and use. Over the past one decade energy efficiency in India has been increasing at a good trot, and energy intensity declined by about 20-25%. Yet there are places where energy efficiency opportunities continue to exist largely because of a range of market failures, information, risks and split incentives. This has led the Government of India through the Energy Conservation Act and the Bureau of Energy Efficiency to launch several programs. The Energy Conservation Act (2001) is the most important multi-sectoral legislation in India and is intended to promote efficient use of energy in India. The Act specifies energy consumption standards for equipment and appliances, establishes and prescribes energy consumption norms and standards for designated consumers, prescribes energy conservation building code for efficient use of energy in commercial buildings, and establishes a compliance mechanism for energy consumption norms and standards. Large scale energy savings can be realized through strengthening of the existing policies, schemes as well as expanding and reaching out to new areas in the 12th Five Year Plan. Total Energy Consumption in India, by Type (2007) Nuclear Hydro Other 0.7% 1.8% Renewables 0.2% Oil 23.7% Coal/Peat 40.8% Natural Gas 5.6% Combustible Renewables and Waste 27.2% Source: International Energy Agency (IEA) The primary energy consumption of India is 421 million tonnes of oil equivalent (mtoe) (2008; International Energy Agency 2009) which is about 3.5% of the world primary energy consumption in the year 2008. The per capita energy consumption is only 0.53 kilogram of oil equivalent (kgOE) whereas the world average is 1.82 kgOE (2008; International Energy Agency 2009). India lacks sufficient domestic energy resources and imports much of its growing energy requirements. According to the International Energy Agency (IEA), coal/peat account for nearly 40 percent of India’s total energy consumption, followed by nearly 27 percent for combustible renewables and waste. Oil accounts for nearly 24 percent of total energy consumption, natural gas 6 percent, hydroelectric power almost 2 percent, nuclear nearly 1 percent, and other renewables less than 0.5 percent. About 30 percent of India’s total energy needs are met through imports.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 447 Bureau of Energy Efficiency (BEE), a statutory body under Ministry of Power is responsible for spearheading the improvement of energy efficiency in the economy through various regulatory and promotional instruments. Some of these initiatives are: a) Regulatory Commissions allowing utilities to factor EE/ DSM expenditure into the tariff b) Creation of an EE/ DSM cell in utilities. c) Introduction of Time of Day tariffs for large industrial and commercial consumers to flatten the load curve. d) Enforcement of mandatory purchase of electricity at fixed prices from cogenerators (at declared avoided costs of the utility) by the grid to encourage cogeneration. e) Adoption of efficient pumping systems and shifting of pumping load to off-peak hours. f) Energy audits to be done periodically and be made mandatory for public buildings, large establishments (connected load >1 MW or equivalent energy use >1MVA) and energy intensive industries. 12 .1 ENERGY CONSERVATION POTENTIAL As per the BEE/NPC report 2009 the electrical energy conservation and potential in India has been identified as below. It is estimated that total 15%-20% energy savings potentials have been identified across the various sectors through demand side management and energy efficiency in India. The Government of India has initiated a comprehensive program to significantly enhance availability of energy at an affordable price to meet the growing needs of the economy. While capacity addition has been given a major focus, energy efficiency along with renewable energy, nuclear energy is the thrust areas to ensure sustainable development. The aim of the energy efficiency policy is to create appropriate conditions for a robust market to function and unlock the estimated potential of around 20%, the enactment of the Energy Conservation Act, 2001, setting up of Bureau of Energy Efficiency (BEE) and the National Mission for Enhanced Energy Efficiency, are steps in this direction. Following table shows the saving potential in India from energy conservation and demand side management Table 12.1 Electrical Energy Consumption and Conservation Potential in India (in BU) S.No. Sector Consumption Saving Potenial % Savings 1. Agriculture Pumping 92.33 27.79 30.09 2. Commercial Buildings / 9.92 1.98 19.95 Establishments with connected load>500 KW 3. Municipalities 12.45 2.88 23.13 4. Domestic 120.92 24.16 19.98 5. Industry (including SMEs) 265.38 18.57 6.99 Total 501.00 75.36 15.04 Source: BEE/NPC Study 2009 12.2 ENERGY CONSERVATION (EC) ACT Recognizing the fact that efficient use of energy and its conservation is the least-cost option to mitigate the gap between demand and supply, Government of India has enacted the Energy Conservation (EC) Act – 2001 and established Bureau of Energy Efficiency. The Act provides for institutionalizing and strengthening delivery mechanism for energy efficiency services in the country and provides the much-needed coordination between the various entities. The Bureau would be responsible for implementation of policy programmes and co-ordination of implementation of energy conservation activities. The mission of BEE is to develop policy and strategies with a thrust on self- regulation and market principles, within the overall framework of the EC Act with the primary objective of reducing energy intensity of the Indian economy.448 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 12.3 PROGRAMME AND MEASURES UNDER THE PROVISIONS OF EC ACT 2001 In order to enhance energy conservation and energy efficiency, various schemes have been initiated by BEE. They are: 1. Energy Conservation Building Code 2. Bachat Lamp Yojana 3. Strengthening of State Designated Agencies 4. Standards and Labelling program 5. Municipal Demand Side Management (MuDSM) 6. Agriculture Demand Side Management (AgDSM) 7. Energy Efficiency in Small and Medium Enterprises (SMEs) and Designated Consumers 8. Professional certification and accreditation 9. Manuals and codes 10. Energy efficiency policy research program 11. Delivery Mechanisms for energy Services, and 12. School education/awareness etc. 12.3.1 Energy Conservation Building Code (ECBC): To set the minimum energy performance standards for new commercial buildings, having connected load of 100 kW and above, as well as to promote energy efficiency in the existing buildings through retrofitting, Energy Conservation Building Code (ECBC) was launched on 27th May 2007. Presently, the code is in voluntary phase of implementation. While the ECBC has been developed by BEE, its enforcement lies with the State governments and urban local bodies. Many states have already amended the ECBC for their state with Odisha, Rajasthan, Karnataka, Uttar Pradesh, Puducherry and Uttrakhand having completed and states such as Punjab, Chhattisgarh and Gujarat are in the finalization of the amendment process of ECBC for their state. To promote adoption of ECBC in the built environment, several enabling measures were taken up during 11th Plan period. These included (1) empanelment of ECBC expert architects, (2) development of technical reference material such as ECBC User Guide, Tip Sheets for lighting, envelope, HVAC, simulation; (3) development of conformance/compliance check tool (ECOnirman) to help architects/ design professionals and code compliance officials to assess conformance with code requirements, (4) Standard ECBC Training Modules covering various aspects of the code, (5) Developed model building bye-laws to mandate minimum energy standards for residential and commercial buildings/ complexes for formulation of draft National Sustainable Habitat parameters on energy efficiency, (6) Harmonization of ECBC with National Building Code(NBC) 2005 has been finalised by including a chapter “Approach to Sustainability” and sent for wider circulation after which it would be adopted in all future constructions in the country, (7) Draft amendments in the CPWD Schedule of Rates have been carried out to incorporate the requirements of ECBC and are submitted to CPWD for further action. The draft report on “Low Carbon Strategies for Inclusive Growth” indicates that by mandating ECBC for new commercial complexes and energy audits in existing buildings, 75 % of new commercial buildings starts during the 12th Plan would be compliant to the ECBC. Similarly, 20% of existing buildings would reduce their present energy consumption by 20% through energy audits & retrofits. Consequently, the estimated savings in energy use in new and existing buildings over the Business As Usual (BAU) scenario is likely to be 5.07 BU. Energy audit studies in buildings have shown large potential for energy savings in government and commercial office buildings. BEE is promoting the implementation of energy efficiency measures in existing buildings through Energy Service Companies (ESCOs) which provide an innovative business model through which the energy-savings potential in existing buildings can be captured and the risks faced by building owners can also be addressed. It has been seen, time and again, that energy conservation in such buildings can be achieved through well-known interventions, which are cost effective as well. However, the implementation of these interventions is hampered by institutional, procedural and process barriers, particularly the inability of building managers to assess and guarantee the energy savings due to these interventions. In order to address this institutional barrier, the Bureau of Energy Efficiency has taken up the task of institutionalizing energy efficiency services, and of promoting energy efficiency delivery mechanisms, such as the development of a market for Energy Service Companies (ESCOs), which address the risks perceived by building owners.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 449 ESCOs provide a business model through which the energy-savings potential in existing buildings can be captured, and the risks faced by building owners can be addressed as well. The performance-contract based payments for energy savings achieved through the interventions carried out by the ESCO ensures that savings are achieved, and that the payments by the building owners to the ESCO are related to the achievement of these savings. In order to create a sense of credibility amongst the prospective agencies that are likely to secure the services of an ESCO as well as the financial institutions, BEE does an accreditation exercise for ESCOs through a process of rating these applicants in terms of success in implementation of energy efficiency projects based on performance contracting, availability of technical manpower, financial strength, etc. The rating exercise is done through SEBI accredited agencies such as CRISIL, CARE and ICRA. The results of this exercise are made available in public domain and to the various State Governments/SDAs, so as to facilitate them in implementing Energy Efficiency programmes in their respective states. BEE has developed draft standard templates for Request for Proposal (RfP) with evaluation matrix to assist SDAs/ building owners/ state governments to invite bids from ESCOs, Investment Grade Energy Audit (IGEA) for addressing the gaps in the DPRs, Draft Performance Contract for EE implementation, Standard M& V plan based on IPMVP guidelines. In order to further accelerate the energy efficiency activities in the commercial building sector, BEE developed a Star labelling programme (Voluntary) for day use office buildings, BPOs and Shopping complexes have been developed, which is based on the actual performance of a building in terms of its specific energy usage in kwh/sqm/year,. The programme rates buildings on a 1-5 Star scale, with a 5 Star labeled building being the most efficient. The Star rating Programme provides public recognition to energy efficient buildings and creates a ‘demand side’ pull for such buildings. Buildings with a connected load of 100 KW and above are being considered under the BEE Star rating scheme. In 12th Plan period, the Star rating scheme will be extended to other building types. 12.3.2 Bachat Lamp Yojana: The residential sector accounts for 25.87 percent of the electricity demand in the country. The lighting load comprises of 28% of this electricity demand in the residential sector and contributes almost fully to the peak load as well. To promote the penetration of energy saving CFLs in the residential sector, BEE has developed the “Bachat Lamp Yojana” (BLY) Scheme. Under the BLY scheme, a maximum of 4 nos. long-life, quality CFL would be distributed by the CFL supplier to the grid-connected residential households in exchange of equivalent no. of incandescent lamps (ICLs) and Rs. 15 per CFL. Approximately 6, 00,000 CFLs can be distributed within a single project. The savings in electricity that would mitigate GHG emissions will be leveraged in the international market by the CFL supplier under the Clean Development Mechanism (CDM) of the Kyoto Protocol. Three types of ICL lamp wattages commonly in use viz. 40 W, 60 W and 100 W are likely for replacement under the BLY scheme. This Bachat lamp Yojana Scheme is registered as CDM Programme of Activities (PoA) with the CDM executive board of UNFCCC to reduce the transaction cost associated with CDM. The project brings together the three key players, namely BEE, the Electricity Distribution Companies (DISCOMs) and Investors to supply the households with CFLs. To bridge the cost differential between the market price of the CFLs and the price at which they are distributed to households, the Clean Development Mechanism (CDM) is harnessed. The CFL supplier (Investor) would cover the project cost through the sale of greenhouse gas (GHG) emission reductions achieved in their respective project areas. BEE, the Coordinating and Managing Entity (CME) will have to keep a functionary to handle the various documentation and protocols required by the UNFCCC (United Nations framework Convention for Climate Change) and the PoA. Further to facilitate the implementation of BLY projects and CFL distribution, this functionary will have to continuously engage with the State Electricity Distribution Companies and CFL suppliers. Till now, 50 BLY projects from various parts of India have been included in this registered umbrella framework. 28 million CFLs have been distributed in the included projects in the XI plan period and CFL distribution is in progress in some of the included project areas. An Avoided Generation Capacity of 324.3 MW has been achieved by the CFL distribution till December 2011 during XI plan. The scheme was designed with 8 Euros as the base price of the CERs. However, as the result of the uncertainty related to the international climate change negotiations and economic slowdown in Europe, the current state of carbon market450 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] does not seem to be very promising at present and the price of CER is varying between 3 to 4 Euros for past several months. Over and above this, the CFLs have become expensive due to the increase in the price of the triband phosphor. All these factors have affected the financial viability of the scheme. This has come as a barrier in speedy implementation of BLY. The database management of the BLY projects and Capacity building of State Electricity Distribution Companies and CFL suppliers along with BEE functionary will be the key focus areas in 12th Plan. In 12th Five Year Plan, activities proposed to be undertaken are: strengthen the on-going BLY scheme by continued engagement with the state electricity distribution companies, workshops on awareness of BLY, inclusion of projects under the registered PoA, monitoring and verification of the BLY projects, updation of the PoA as per the UNFCCC rules, formulating guidelines and processes for bulk procurement of LED bulbs and other areas of the scheme and monitoring and verification of the LED projects. 12.3.3 Strengthening of State Designated Agencies (SDAs): State Designated Agencies (SDAs) are statutory bodies set up by states to implement energy conservation measures at state level. State designated agencies (SDAs) in different states need to play a very important role in terms of carrying forward various energy efficiency initiatives at the state level. The main emphasis of the scheme is to build capacity of the SDAs to enable them to discharge regulatory, facilitative and enforcement functions under the EC Act 2001. The thrust of the SDA program during the 12th Plan will be on strengthening the 32 SDAs which would enable them to implement various programs and activities initiated by BEE or SDAs themselves. In the 11th Plan, BEE supported State designated agencies (SDAs) in preparation of action plan, building institutional capacity of SDAs, to perform their regulatory, developmental and promotional functions in their respective states, by way of technical assistance, guidance and funding etc. Each SDA has been supported to develop a five year Energy Conservation Action Plan, customized to local needs aiming at and delivery of the EC act mandates. The proposed activities for the 12th Plan include sector specific interventions in areas like municipality (drinking water and sewage treatment), agriculture sector (pumping), street lighting, commercial buildings, government buildings and waste heat recovery in SMEs including demonstration projects. Following initiatives of SDA are proposed to be supported that would help in strengthening the capacities of SDAs and undertaking of various projects and programmes to promote energy efficiency in their respective states: • Support for implementing state-wise sector specific energy saving plan by the SDAs • Continued engagement of SDAs with energy efficiency professionals like energy auditors, energy managers and ESCOs • Implement various EE demonstration projects in the states to showcase the effectiveness of the most advanced energy efficient technology and pursue state governments to replicate the project in other parts of the state. • LED village campaign in the villages and pursue state governments to replicate the project in other parts of the state. • Publicity /awareness on EE in the states • Workshops/ training programmes for all the stakeholders • Capacity building programmes for the SDAs The total funds requirement for the above proposed activities is Rs. 140 crore. The State Energy Conservation Funds (SECF) as mandated under the Energy Conservation Act, 2001, have already been constituted in 24 states and funds have been released to all the states during the 11th Plan to operationalize the SECF for various energy efficiency initiatives. The state governments of Andhra Pradesh, Rajasthan, Chhattisgarh, Karnataka, Haryana, Punjab, Kerala, Himachal Pradesh and Odisha have also contributed a matching grant to the SECF and were provided the second instalment by BEE. In the 12th Plan, it is proposed to set up the SECF in all the states and¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 451 • Pursue with SDAs for constitution of SECF in the states and matching contribution by the state governments to the SECF. • Coordinate with SDAs to implement various energy conservation activities and utilization of fund under SECF. Contribution of Rs. 50 crore to state energy conservation fund is proposed under the 12th Plan. Total fund required for strengthening of SDAs and SECF is Rs. 190 crore. 12.3.4 Standards and Labeling Program (a): Equipments & Appliances: The National Energy labeling program was launched on May 18, 2006. Key objective of this scheme is to provide the consumer an informed choice about the energy saving and thereby cost saving potential of the relevant marketed equipments/appliances. During the 11th Plan, under this scheme, a large number of appliances were covered initially under the voluntary labelling categories, out of which four appliances/equipment namely AC, Frost Free Refrigerator, TFLs and Distribution Transformers (up to 200 KVA) have been notified for mandatory labelling program. The energy performance standards for split ACs and Frost Free Refrigerators were further upgraded with effect from January 2012. The S&L Program was quite successful during the 11th Plan period and has contributed to the savings in avoided capacity addition of 7766 MW upto 31st December 2011. The 11th Plan has already envisaged inclusion of 14 appliances under S&L programme and the 12th Plan also envisage widening and deepening the program. It is envisaged that by the end of 12th plan, 27 products (7 mandatory and 20 voluntary) would be covered under S&L scheme. A baseline survey would also be taken up to find relevant data on 5 products. The proposed activities in 12th Five Year Plan under S&L for equipments and appliances include: • Inclusion of at least 13 new equipment and appliances in the S&L program. Standby power loss reduction in few of the electrical appliances will also be focussed in the 12th Plan. • Mandatory labelling program for Direct Cool Refrigerators, Color TV and Water heaters • Awareness creation and capacity building of among all the stakeholders, • Undertaking of check testing, label verification, market impact assessment for appliances/ equipments covered under S&L scheme. • Involvement of State Designated Agencies to act as Independent Agency for verification and monitoring. (b) S&L for Transport Sector There are total 13.3 million passenger cars (2010 – 11) in India which consume about 9 mtoe. The average annual sales of new passenger cars in the country are about 1.1 million. Under the sector, the following activities are proposed : • Introduction of fuel economy norms in terms of Corporate Average Fuel Consumption (CAFC) for 2015-16 to 2020-21 and 2020-21 and beyond • Introduction of labelling program for passenger cars • Technical study for 2 & 3 wheelers and commercial vehicles (Truck & Buses) to finalise S&L programme The targeted energy saving by the end of the 12th Five Year Plan is 4.3 mtoe. Based on the above proposed schemes, fund requirement of Rs. 200 crores have been envisaged for the Standard & Labeling programme for the 12th Plan. Based on the above investment, the likely saving from the S&L scheme in the year 2016-17 is estimated to be 10.4 BU of electrical energy and 4.3 mtoe of thermal energy. (c) Super Efficient Equipment Program (SEEP) SEEP is a part of Market Transformation for Energy Efficiency (MTEE) initiative, one of the four initiatives of the National Mission on Enhanced Energy Efficiency (NMEEE). The primary objective of MTEE is to accelerate the shift to energy efficient appliances through innovative measures to make the products more affordable. This programme proposes to deal directly with the manufacturers of select key appliances. Usually, only a handful of manufacturers account for 70 to 90% of the market share of these appliances. SEEP would compensate the manufacturers for a major part of the incremental cost of producing Super Efficient Appliances (SEAs), and encourage452 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] them to not just produce but also sell SEAs at an affordable price to common consumers. The need for incentive is expected to reduce very fast as volumes pick up. In this manner, the programme would help to introduce appliances that are far more efficient than the ones currently available in India thus, narrowing the massive gap between the efficiency of the average purchase and that of the most efficient technology available internationally. Super efficient appliances (SEA) may consume 30 to 50 percentages less energy than the five star rated equipments of BEE. SEAs will have their high first cost which can be decreased by large scale production facilities, but due to uncertainty of market demand, manufacturers feel reluctant to make the initial investment to change production lines for super efficient appliances. This barrier needs to be removed by innovative policy interventions. BEE has identified ceiling fans as the first product under SEEP and in consultation with stakeholder such as manufacturers, technology developers, civil society organizations, R&D and academic institutions; technical specification, monitoring process etc. has been developed. The ceiling fan market will undergo a significant transformation because of the SEEP intervention. It is expected that 26 million SEA ceiling fans will be deployed by the end of the 12th Plan which will provide savings of 2.2 billion units in the year 2016-17 of 12th five year Plan. SEEP would also be extended to LED bulbs in the 12th Plan. It is estimate that about 25 million LED bulbs will be deployed under SEEP in the 12th Plan and from which a saving of around 2.01 billion units is expected. 12.3.5 Municipal Demand Side Management (MuDSM)- The global trend towards increased urbanization requires municipal bodies to provide services such as streetlights, solid waste management, sewage treatment & disposal, etc. All these activities consume significant amount of electricity, usually in an inefficient manner. The cost of energy sometimes constitutes more than 50% of the municipality’s budget and implementing efficiency measures could reduce it by at least 25%. The basic objective of the Municipal Demand Side Management (MuDSM) programme is to improve the overall energy efficiency of the Urban Local Bodies (ULBs) which could lead to substantial savings in the electricity consumption, thereby resulting in cost reduction/savings for the ULBs. The situation analysis was carried out in the Municipal sector in 2007 covering 23 States/UTs. The finding across all the 171 cities spread in 23 states points out that only 9 cities have exclusive energy cell. Other Municipal’s region neither had energy cells nor having any medium for collection of data for improvement of energy efficiency. Bureau of Energy Efficiency has initiated a programme to cover 175 municipalities in the country by conducting energy audits and preparation of Detailed Project Reports(DPRs) and implementation through ESCO mode. Energy Efficiency in ULBs • As low as only 38 cities out of 171 have separate allocation in their budget for any energy efficiency initiative. Notably out of total budget allocation of Rs. 12,123 crore across these 171 cities, only Rs 128.5 crore (1.06%) was allocated exclusively for energy efficiency initiatives in the year 2006-07. This subsequently went down to 0.88% in 2007-08 with the allocation of Rs 161.8 crores out of total budget provision of Rs 18,430 crore. Based on the data collected in the situation analysis survey, the energy saving potential for 12th Plan has been estimated as 257 million units (MU) in the urban local bodies. Energy Efficiency in Water pumping • During the course of initial Investment Grade Audits (IGAs) of ULBs, it was found that over a period of time, many of the water pumping bodies (Jal Nigam/ Jal Sansthan/ Water Department) have separated out from the scope of ULBs and therefore, a separate situation analysis of these bodies was carried out. The representative water bodies, encompassing total of 3520.65 lakh of population in 1896 Sq.km spread across 105 cities, were covered during this sample based survey for situation analysis covering 19 states. In this study, the overall estimated electricity consumption in the pumping was 1040 MU with an estimated electricity saving potential of 208 MU.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 453 Based on the above survey, funding requirement of Rs. 25 crores is envisaged for the MuDSM Scheme during the 12th plan as this scheme would create an institutional mechanism for implementation of the MuDSM in the country. The above budget is meant for undertaking investment grade energy audits in Jal-Nigams (Water Bodies) and implementation of energy conservation measures in few selected ULBs whose DPRs were prepared in the 11th plan. 12.3.6 Agriculture Demand Side Management (AgDSM)- : Agriculture accounts for about 20% of electricity consumption in the country, which is increasing due to rural electrification efforts of the Government. The electricity is largely used in agricultural pump sets which generally have very poor efficiency. Since agricultural tariffs are usually the lowest and also highly subsidized, there is no incentive to the agricultural consumer to improve efficiency of the pump set. However, utilities are not able to recover economic price on every unit of energy sold to these categories of consumers and therefore need to aggressively target these consumers for DSM measures. Ag DSM promises immense opportunity in reducing the overall power consumption, improving efficiencies of ground water extraction and reducing the subsidy burden of the states without sacrificing the service obligation to this sector. To tap the energy saving potential in the agriculture sector, which is estimated to be 20.75% (2007-08) of the total energy consumption, the activities proposed to be undertaken in the 12th Plan would focus on to build up the process of acceleration of sustainable energy efficiency in the plan through; widespread mandatory regulation across the country for every new pumpset connections, financial assistance for EEPS, implementing DPRs prepared in 11th plan, Monitoring and Verification, facilitating the usage of star labeled pump sets in the existing State/Central government schemes, leveraging the CDM methodology/CERs earning, capacity building, implementing pilot rural drinking water pumping efficiency projects, strategic approach for dissemination of results.The major impacts of the Ag DSM scheme during the 11th Five Year Plan includes 97 MU of annual energy saving potential assessed across eight different states covering about 20,885 pump sets. First AgDSM pilot project covering 2600 numbers pumpsets is being implemented in Solapur region of Maharashtra. Based on the results achieved during the 11th Plan, the proposed targeted reduction in electricity consumption by efficiency upgradation of 2.7 Lakhs pump sets at the end of 12th Plan is 660 million units (MU). The following instruments are proposed to meet the target: • Regulatory mechanism to mandate the use of BEE star labelled pump sets for new connections through SDAs. (Target – 2.5 lakh pump sets). o Facilitate SDAs/State governments to promote the use of star rated Energy Efficient Pumpsets (EEPS), coupled with financial assistance provided to marginal and small farmer category for installation of EEPS o Promoting the use of EEPS in existing State/Central government schemes applicable to agriculture pumping sector. • Facilitating the Implementation of DPRs prepared in 8 States during 11th plan and placement of Monitoring & Verification protocol to capture the project energy savings.(Target: 0.2 Lakh pumpsets) • Technical assistance and capacity development of all stakeholders. • Few Demonstration projects for energy efficiency improvement of water pumping systems in rural public drinking water systems. (Budgetary provision; Rs.9.1 crore) At the end of the 12th Five Year Plan, it is forecasted that through market transformation of agriculture pump sets, major manufacturer of agriculture pumps in the organized SME sector would transform into manufacturing of energy efficient star labelled pumps through the various initiatives of BEE schemes/programmes. Wider involvement of stakeholders like DISCOMs, state regulatory commissions, State Designated Agencies, State Governments, pump manufacturers, energy saving companies, farmers/ consumers etc. is one of the key initiatives under the scheme. The projected electricity saving at the end of 12th Plan i.e. 2016-17 is about 660 MU with the financial budget requirement of Rs. 80 crore. 12.3.7 Energy Efficiency in Small and Medium Enterprises (SMEs) and Designated Consumers: The SME sector is an important constituent of the Indian economy, contributing significantly precisely 8% in GDP, 45% in454 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] manufacturing output and 40% of the total export. Similarly this sector also plays a significant role in energy consumption which is about 25% of the total energy consumption by industrial sector. There are more than 1200 MSMEs clusters in the country comprising about 350 to 400 large manufacturing clusters out of which 180 clusters are energy intensive. Thus there is a need for support to MSMEs in the acquisition and adaptation of energy efficient clean technologies and capacity building, particularly in the context of the National Action Plan for Climate Change (NAPCC). To stimulate energy efficiency measures in 25 high energy consuming small and medium enterprises, BEE in consultation with Designated State Agencies has initiated diagnostic studies in 25 SME clusters in the country and developed cluster specific energy efficiency manuals/ booklets and other documents to enhance energy conservation in SMEs. The proposed schemes/activities to be undertaken in 12th Plan are as mentioned below: • Sector specific approach for energy efficiency and technology up gradation through facilitation of implementation of DPRs • Energy mapping of the targeted SME Sector on all India basis • Undertaking of Innovative Financial Schemes for adoption of EE Technologies in the SMEs • Technical assistance and capacity building • SMEs Product Labelling Promotion Scheme The approach would be based on the replication of results and findings from the 11th Plan. The total energy consumption in these 25 SME clusters was 4468375 toe and the saving potential was estimated to 663771 toe which is about 15% of the consumption. The reported saving from these clusters was about 14300 toe from 650 EE projects. The energy consumption by energy intensive sector of MSME would be 30.7 mtoe (estimated) in year 2016-17. To achieve the targeted saving (131 MW), BEE is directly or indirectly targeting intervention in about 1500 SMEs units of various clusters in the country through the support of different agencies programs working for energy efficiency in SMEs. This would include implementation of DPRs on energy efficient technologies and development of Local/technologies Service Providers for SMEs, capacity building of stakeholders including bankers /FIs and strategic approach for dissemination of results. The strategy will be to move from cluster based approach to sector based approach to enable large degree implementation in the sectors selected under the 11th Five Year Plan. 12.3.8 Promotional Activities to Enhance Awareness Support Energy Conservation Act The EC Act, 2001 requires the Government and BEE to take steps to enhance awareness about energy efficiency and energy conservation amongst stakeholders. In pursuance, the following activities are being implemented: • National Awareness Campaign The objective of the general awareness as well as the Standards and Labelling Programme Campaign of BEE and MOP is to create awareness amongst public on the efficacy and virtues of adopting a habit for energy conservation. The General Awareness Campaign would create awareness to motivate people to save power by rational use of electricity. This campaign will serve as the umbrella campaign for the energy conservation initiatives and lay emphasis on the subject as the need of the hour. A Multi media outreach strategy has been prepared to achieve maximum reach to the targeted audience. The combination of Media taken in the plan viz. Print, TV, Satellite, Radio, Cinema, Internet would give 96% reach. The multimedia campaign is being carried out in a phased manner: TV, Print and Radio plan has already been rolled out. Channel selection in TV/Satellite is based on TAM ratings to achieve 65%+ reach at 5+ OTS. For print, popular and top English, Hindi and regional language newspapers along with vernacular magazines have been taken up. The stations for radio campaign have also been selected in such a way so as to attain the maximum reach. All the channels, stations and newspapers have been selected as per the DAVP policy. Alongside, monitoring and performance evaluation would be stepped up to ensure that the scheme attains its designated targets.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 455 The allocation of resources over the various media platforms is such that TV and satellite constitutes the highest allocation followed by print and radio. The plan for Cinema and internet has also been proposed. Many activities to promote awareness on energy conservation amongst the targeted sectors and general public and also for school children were undertaken during 11th Plan which include National Energy Conservation Award for industries, buildings and railways and Painting Competition on energy conservation for school children. • National Energy Conservation Awards The National Energy Conservation Award Scheme of Ministry of Power covers about 36 sectors of industry, thermal power stations, office buildings, hotels and hospitals, zonal railways, state designated agencies, municipalities and manufacturers of BEE Star labelled appliances. In the last 13 years of Award Scheme of the period 1999-2011, the participating units have collectively saved Rs 15789 Crores and the investment made on energy efficiency projects was recovered back in 18 months. In energy terms, 17956 Million kWh of electrical power, 31 lakhs kilolitre of oil, 124 lakhs metric tonne of coal and 22.44 billion cubic metre of gas was saved, through the energy conservation measures of the participating units. The progressive industrial units and other establishments have already realized the cost effectiveness of energy conservation measures and honouring their efforts on National Energy Conservation Day, gives a message to thousands of other industrial units and establishments who may have not yet fully utilized their cost effective potential through energy conservation. It is hoped that National Energy Conservation Award Scheme would help in motivating the other energy consumers in joining and promoting of a nation wise energy conservation movement. It is proposed to strengthen all ongoing activities during the 12th Plan and introduce the following specific activities: • Creation of data base and its analysis EC Award participating units • Compilation and dissemination of best-practices in industry and building sector • Continuation of EC Awards and paintings competition on energy conservation • Awareness creation on energy conservation through print, electronic and other media for general public The projected saving in the year 2016-17 of 12th Plan is about 3.42 BU of electrical energy and 5 mtoe of thermal fuel saving with the financial budget requirement of Rs. 100 crore. • National Painting Competition Children are an important target group as well as stakeholders in increasing awareness; therefore the Ministry of Power and BEE took up this innovative scheme to target children. The Ministry of Power has launched Painting competition for students in the standards 4th, 5th & 6th at the School, State and at National level, Essay writing competition for students in the standards 6th to 8th at the School and State level, Debate competition for students in the standards 9th to 12th at the District and State level has been included as one of the activities of the campaign, which would not only make aware the children about the need of conserving energy but at the same time would educate and involve their parents as well in the above cause. The identified activity is one of the measures, which can help in creating awareness in the domestic sector. In 2011, around 58,855 schools and 2072,285 students participated in the Painting competition. 12.3.9 Results achieved / expected The Ministry has set up a targeted reduction of 5% energy consumption by the end of XI Five year Plan. The energy conservation potential as assessed is 20,000 MW and the target planned for the XI Plan is 10,000 MW. The major achievements are as follows: (cid:1) 9368 Certified Energy Managers out of which 6791 are Certified Energy Auditors till 12th examination. (cid:1) 13 National Certification Examination for Energy Managers and Energy Auditors successfully conducted. (cid:1) 4 Guidebooks prepared to assist energy professionals. (cid:1) Four interactive Websites in place. (cid:1) 32 State Governments and Union Territories have notified State Designated Agencies for implementing EC Act within the state. (cid:1) Standards & Labeling scheme has resulted in electricity saving of 4611 MU, equivalent to avoided capacity generation of 2565 MW during 2011-2012.456 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] (cid:1) As per details collected from SDAs to review energy savings based on activities carried out, the reported avoided capacity addition is 1065 MW. (cid:1) The estimated avoided capacity based on individual savings achieved by 644 participating units in the National Energy Conservation Award Programme 2011, is equivalent to 504 MW. (cid:1) The achievements in respect of energy saved relating to the programmes/ schemes of the BEE during 11th plan is 10836 MW. 12.4 SUPPLY-SIDE MANAGEMENT 12.4.1 The thermal units in the country have a unit capacity of up to 600MW. A large number of supercritical units of sizes 660/800 MW are under construction. Initially supercritical units were designed with parameters of 247kg/cm2, 537/50C. Now higher parameters of 247kg/cm2, 565/5930C are being envisaged. With the higher steam parameters being envisaged for supercritical units, the efficiency of these supercritical units would be about 5% higher than the efficiency of present 500 MW units. This would lead to corresponding saving in coal consumption and reduction in GHG emissions. In 12th Plan, supercritical units are likely to constitute a majority of coal based capacity addition.. During 13th Plan, thermal capacity addition will be from supercritical units only. A very large number of small size units of 100 MW or less capacity are in operation. The average PLF of most of these units is very low, even less than 50%. These units are of non-reheat type having very low design efficiency. Such units are planned to be retired in a phased manner over a period of next ten years. 12.4.2 Thermal power stations in the country are operating with high auxiliary power consumption and secondary fuel oil consumption. These factors, coupled with poor operation and maintenance practices, result in poor efficiency of the stations. Mapping studies carried out by CEA on thermal power stations have revealed that the power stations are losing heavily due to poor condenser vacuum, non-availability of HP heaters, excessive consumption of DM water, air ingress into the boiler, high flue gas temperature and a number of other reasons. Most of the power stations were incurring huge financial losses due to sub-optimal operation resulting in increased coal & oil consumption. 12.4.3 Benefits have accrued in terms of higher generation, improvement in heat rate, and reduction in specific fuel oil and coal consumption at a number of TPSs where the recommendations given by CEA in the mapping reports have been implemented. Monitoring of implementation of the recommendations is being carried out regularly. CEA has also prepared “Guidelines for establishment of Energy Audit Cells at TPS” to encourage thermal power stations to conduct energy audits on their own. Energy Conservation Act 2001 makes it mandatory to get energy audit of power stations done through Accredited Energy Auditors. Energy Audit and implementation of recommendations to improve operational efficiency may form part of regular activity and necessary financial arrangements may be made accordingly. 12.4.4 Transmission and Distribution (T&D) losses in the Indian system are amongst the highest in the world. Presently the all-India T&D losses are around 27%, out of which substantial portion is non-technical losses and theft. Reduction of the non-technical losses could be achieved with better management at a little extra cost. Schemes have been drawn up to reduce technical losses by installation of additional capacitors, appropriate size of the transformers, installation of amorphous core transformers, augmentation and strengthening of transmission and distribution lines and reduction of the length of low voltage lines. Based on the guidelines issued for reduction of transmission and distribution losses and energy audit in power system, Utilities have been encouraged to reduce the T&D losses by implementing the schemes in regard to computerised system load management through segregation of load to agriculture and introduction of Time of Use (TOU) differential tariffs etc. T.O.U. Tariffs should be such designed in the form of incentive of lower rate that it should encourage use of more energy during off-peak hours and higher rate should be fixed to discourage the use of energy during peak-hours. Regional staggering of load should be aimed to stagger the load and minimizing the load of the system during peak hours. These efforts have to be vigorously followed up along with steps to curb pilferage and theft of electricity. The High Voltage Distribution system (HVDS) has greater potential to reduce T&D losses and should be encouraged. 12.4.5 The Indian power system is around hundred years old. With latest technology developments, there is ample scope for improvement in the system of generation and supply of electricity to the ultimate consumers in the most effective and efficient way within acceptable environmental level. Some of the latest technologies are Circulating/¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 457 Pressurized Fluidized Bed Combustion (CFBC & PFBC), coal washing/ benefaction, computer-aided up gradation of sub-stations, supercritical pulverized fuel units and Integrated Gasification Combined Cycle (IGCC) plants. 12.5 ACHIEVEMENT UNDER THE 11th Plan Bureau of Energy Efficiency (BEE) and Ministry of Power (MoP) had introduced a number of schemes during 11th Five Year Plan for promotion of energy efficiency in India. The schemes of BEE include Standards and Labeling (S&L), Energy Conservation Building Code (ECBC) & Energy Efficiency in Existing Buildings, Bachat Lamp Yojana (BLY), SDA strengthening, Energy Efficiency in Small and Medium Enterprises (SMEs), Agriculture & Municipal Demand Side Management (DSM) and Contribution to State Energy Conservation Fund (SECF). The schemes of the Ministry of Power (MoP) include Energy Conservation Awareness, Energy Conservation Awards & Painting Competition on Energy Conservation for school students and National Mission for Enhanced Energy Efficiency (NMEEE). In the 11th Five Year Plan (2007–12), it was proposed to achieve the energy saving of 5% of the anticipated energy consumption level in the beginning of the 11th Five Year Plan. The outcomes of these schemes are quite encouraging; various activities under different schemes of BEE and MoP have resulted in savings in avoided power capacity of 10,836 MW (verified; till Dec 2011). 12.6 UTILITY BASED DEMAND SIDE MANAGEMENT IN THE 12TH PLAN Demand-Side Management (DSM) is the selection, planning, and implementation of measures intended to have an influence on the demand or customer-side of the electric meter. DSM program can reduce energy costs for utilities, and in the long term, it can limit the requirement for further generation capacity augmentation and strengthening of transmission and distribution system. BEE would provide the technical assistance for establishment of DSM cells in the DISCOMs and capacity building of personnel of DSM cells for enabling them to undertake the following strategies and schemes of DSM in 12th Five Year plan: (I) LOAD SURVEY The questionnaire based surveys are the most commonly adopted tools to study the consumption pattern of the consumers by a utility. “Standard load survey techniques” need to be developed which may be adopted by the DISCOMs. Also it is envisaged that DISCOMs to develop utility/city level load profiles which may be uploaded on DISCOMs and BEE’s DSM website (http://www.bee-dsm.in) on a periodical basis which can be utilized for DSM plans and for further analysis. (II) LOAD STRATEGIES Load strategies are to be adopted by electricity utilities to modify customer load profiles and thereby reduce their peak demands. Following Load management strategies may be demonstrated by DISCOMs/Utilities: * Demand Response Demand Response is an effort to create additional capacity during the peak hours, by involving voluntary load curtailment by consumers during peak hours or when requested by the distribution companies. The load curtailment can be achieved through implementing load reduction by Energy Efficiency or by load shifting measures. * Load Management Programmes • Dynamic/Real Time Pricing: Based on real time system of supply & demand • Time-of-Use Rates: Customers are offered different rates for electricity usage at different times of the day. • Automated/Smart Metering: Implementing Dynamic/ Real Time Pricing or Time-of-use rate structure and billing accordingly. • Web-based/Communication System: This is a tool used along with the above to convey to the customer about the prevailing demand, supply, prices on real time basis and the incentives and options for him, which are used by the customer to manage the demand. (III) DEMONSTRATION STUDIES Direct installation programs that provide complete services to design, finance, and install a package of efficiency measures.458 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] (IV) ADVANCED METERING Advanced Meter has the capability of online communication, accurate measurements, local intelligence, load connect- disconnect facility and consumer friendly display unit. Adoption of this technology will help distribution companies in implementing Demand Side Management specially Demand Response Activities. (V) DSM FINANCING The strategic value of DSM measures and energy efficiency lies in their ability to improve the financial cash flow of Indian utilities. Moreover, DSM and Demand Response (DR) Activity are utilized to curtail the peak electricity demand. In other words, it helps to negate spending on generation, transmission and distribution infrastructure by curtailing the peak. Thus, it can be said that funds are freed up which would otherwise be utilized to meet the peak demand. At the National level, the load growth should be reviewed with and without DSM and the fund freed up because of lower peak growth should be used for DSM/DR activity. In other words, the DSM/DR should have a target (say 0.5% to 1%) of peak demand reduction and the net saving in infrastructure due to that should be used for DSM/DR activity. The total funds required for providing technical assistance for capacity building of DSM cells established by DISCOMs under 12th Five Year Plan is Rs. 300 crore. 12.7 ENERGY CONSERVATION STRATEGY IN THE 12TH PLAN The strategies adopted during the 11th Five Year Plan have started showing encouraging outcomes. It is necessary to carry forward the existing schemes as well as further strengthen the activities to accelerate the process of implementation of energy efficiency measures to achieve the desired energy savings. Further, large scale energy savings can be realized through strengthening of the schemes in industrial, commercial, residential and agriculture sectors as well as expanding and reaching out to new areas. Projected electrical energy saving potential at the end of 12th Five Year Plan i.e during the year 2016-17 is 44.85 BU on the demand side (equivalent to 60.17 BU at Bus bar) and an additional energy saving equivalent of 21.3 mtoe in the industrial sector (including Thermal Power Stations (TPS) and Small and Medium Enterprises), Transport Sector and Energy Conservation (EC) award scheme. The share of target energy saving (Electrical & Thermal) for various proposed schemes under 12th Plan is given below: 12.8 THE NATIONAL ACTION PLAN ON CLIMATE CHANGE (NAPCC) The National Action Plan on Climate Change(NAPCC) released by the Prime Minister on 30th June, 2008, recognizes the need to maintain a high growth rate for increasing living standards of the vast majority of people and reducing their vulnerability to the impacts of climate change. The National Action Plan outlines Eight National Missions, representing multi-pronged, long-term and integrated strategies for achieving key goals in the context of climate change. The National Mission of Enhanced Energy Efficiency is considered as one of the key missions to achieve the objectives of the NAPCC. The National Mission for Enhanced Energy Efficiency (NMEEE) seeks to identify measures to promote India’s development objectives and also result in co-benefits useful in dealing with adverse impacts of climate change. Cost-effective energy efficiency and energy conservation measures are particularly important in this connection. The basic tenet of the mission is to ensure sustainable growth through an appropriate mix of 4 Es: Energy, Efficiency, Equity, and Environment. The NMEEE spelt out the following four new initiatives to enhance energy efficiency, (in addition to the programmes on energy efficiency being pursued by MOP and BEE in the 11th Plan): i) Unique market based mechanism for energy intensive industries through Perform Achieve and Trade (PAT); ii) Accelerating the shift to energy efficient appliances in designated sectors through innovative measures to make the products more affordable. (Market Transformation for Energy Efficiency (MTEE); iii) Creation of mechanisms that would help finance demand side management programmes in all sectors by capturing future energy savings. (Energy Efficiency Financing Platform (EEFP); iv) Developing fiscal instruments to promote energy efficiency namely Framework for Energy Efficient Economic Development (FEEED);¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 459 The Ministry of Power (MOP) and Bureau of Energy Efficiency (BEE) were tasked to prepare the implementation plan for the NMEEE. NMEEE spelt out the following four new initiatives to enhance energy efficiency, in addition to the programmes on energy efficiency being pursued. They are: (i) Perform Achieve and Trade (ii) Market Transformation for Energy Efficiency (MTEE) (iii) Energy Efficiency Financing Platform (EEFP): (iv) Framework for Energy Efficient Economic Development (FEEED): (i) Perform, Achieve and Trade (PAT): It is a market based mechanism to enhance cost effectiveness for improvements in energy efficiency in energy- intensive large industries and facilities, through certification of energy savings that could be traded. Government of India notified the PAT scheme on 30th March, 2012 and the scheme became mandatory from 1st April, 2012. During the first cycle of PAT scheme i.e. from 2012-13 to 2014-15, 478 Designated Consumers in eight energy intensive sectors such as Thermal Power plants, Aluminium, Cement, Chlor-alkali, Fertilizer, Iron & Steel, Pulp & Paper, and Textile have been included, which account for about 165 million ton of oil equivalent of energy consumption annually. The direct benefit for the participating industries in this period is energy saving of 6.686 million ton of oil equivalent energy, which is around 4% of total Reported Energy Consumption of these 478 designated consumers assessed under PAT. (ii) Market Transformation for Energy Efficiency (MTEE): MTEE is the scheme to accelerate the shift to energy efficient appliances in designated sectors through innovative measures to make products more affordable with focus on leveraging international financial instruments, including Clean Development Mechanism (CDM) to make energy efficient appliances affordable and increase their levels of penetration. Government is also going to launch Super-Efficient equipment program in 12th five year plan. Ceiling fans have been identified as the first appliance to be adopted. The program proposes to incentivize fan manufacturers to produce and sell super- efficient fans that are 30-50% more efficient than the most efficient available in the market at discounted price to consumers. Several rounds of consultation meetings were held with all stakeholders such as fan manufactures, R&D institutions, technology innovators, and academia and policy bodies to deliberate upon specification, incentive structure, and measurement and verification strategy and to work-out a road map of the program. Performance specification of a super- efficient ceiling fan has been finalized and program development is at advance stage of finalization. (iii) Energy Efficiency Financing Platform (EEFP) To promote the energy efficiency market in India, it is envisaged that need for policy interventions, implementation of demonstration projects, promoting Energy Services Companies (ESCOs), developing and standardizing sustainable contractual and legal documents and putting in place a financing mechanism as key elements of creating markets for energy efficiency the Platform. Government is also expanding the different Energy Efficiency Financing Platforms though MOUs with public sector, banks, and training of bank officials for appraisal of energy efficiency projects. MoU has been signed by BEE with M/s. PTC India Ltd, M/s. SIDBI, HSBC Bank, Tata Capital and IFCI Ltd. to promote financing for Energy Efficiency projects. Two conferences were organized in association with financial institutions on PRGF and VCFEE in Delhi and Mumbai on 14th February, 2012 and 17th February, 2012 respectively to stimulate financing for Designated Consumers of Maharashtra and Gujarat. Framework for Energy Efficient Economic Development (FEEED) Government is also making efforts to create a market for energy efficiency with fiscal instruments by providing reassurance to lenders by providing a guarantee for performance contracts, providing a venture capital fund, promoting leadership in the public sector on energy efficiency and promoting energy efficiency in public procurement based on life cycle cost analysis. Two types of fund for energy efficiency are being established. One is the Partial Risk Guarantee Fund for Energy Efficiency (PRGFEE) and the other is the Venture Capital Fund for Energy Efficiency (VCFEE). Partial Risk Guarantee Fund (PRGF) A PRGF is a risk sharing mechanism lowering the risk to the lender by substituting part of the risk of the borrower by granting guarantees ensuring repayment of part of the loan upon a default event. The PRGF guarantees a maximum 50% of the loan provided by the Participating Financial Institution (PFI). Venture Capital Fund for Energy Efficiency (VCFEE)460 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Target Market : Segments with Gas Existing & Proposed (Bubble Size in MW) 10.5 Hotel 731 9.5 Airport 1,698 8.5 Hospital 270 7.5 Retail 754 6.5 Office 5.5 2,590 4.5 7.0 7.5 8.0 8.5 9.0 9.5 10.0 10.5 Financial Attractiveness ssenevitcarttA tekraM VCFEE as envisaged by the Government of India under the National Mission for Enhanced Energy Efficiency can go long way in addressing these barriers and kick starting some of the long awaited energy efficiency projects in the country. This fund provide risk capital support to energy efficiency investments. 12.9 OTHER POTENTIAL AREAS Other potential areas that BEE has initiated and which offer significant energy efficiency potential: Trigeneration The HVAC market size in India in the year 2007 was about 13 million kW; 14 % of that was for the domestic sector. The ratio of window to split ACs in 2004-05 was 3:1 and now the figure is 1:1. HVAC market in India is mainly characterized by the air-conditioning market. There is a market for hot water generators (i.e. geysers) in the Northern and Central part of the country. About 1.6 million of such heaters are sold annually in India. Assuming average power consumption of 1.5 kW/ heater, total installed capacity would be about 2400 MW. It has been estimated that about 3000 MW gas based power system is already installed in India, out of that about 1000 MW are recently added in Indian building sector and out of the 1000 MW installed 522 MW are for cogeneration/tri-generation projects. The tri-generation and cogeneration market is expected to grow very rapidly in future. Present market size has been estimated at 13 x 106 kW (3.7 X 106 TR) out of which about 2.3 x 106 kW (0.65 x 106 TR) represents chilled water based central system, which is likely to be the immediate target market for cogeneration/tri-generation system. Office Retail Hotel Hospital Airport¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 461 Waste-to Heat Recovery India has nearly 13 million of micro, small & medium enterprises which constitute more than 80% of the total number of industrial enterprises in the country. Small industries have a 45% share of the total manufacturing output and they contribute nearly 40% of total exports in the economy. They are one of the biggest employers providing employment to about 41 million people and according to recent estimates, constitutes about 8-9% of the country’s GDP. The SME sector is one area which demonstrates high overall potential for reductions in energy intensity ranging from 20 – 25% as per study conducted by the BEE. SMEs, especially those for whom energy costs represent a large portion of total production costs, can reap especially high benefits from improving efficiency of energy conversion and reduction of energy losses, yet numerous barriers and market failures have prevented widespread adoption of these measures. Rising energy costs can lead to higher production and distribution costs for business, eroding long term competitiveness and profitability. SMEs are particularly vulnerable due to limited resources and tight operating margins. Cutting energy waste can be quick way for them to reduce costs, but they often lack the knowledge, financing and dedicated personnel needed to identify efficiency opportunities and implement improvements. Potential savings can be unlocked through simple measures, one of which can be the waste heat recovery in some of the clusters. Also, demonstration in few units will have high replicability potential as these units are located in clusters. In order to have an effective implementation mechanism within the timelines indicated in National Mission on Enhanced Energy Efficiency (NMEEE), the Ministry recommended augmentation of energy efficiency institutional structure, both at the policy/ regulatory level by strengthening BEE and creation of an implementation corporate entity as a Joint Venture. As a result, Energy Efficiency Services Limited (EESL) is a joint venture company promoted by 4 Central Public Sector Undertakings (CPSUs), namely National Thermal Power Corporation Limited (NTPC Limited), Power Grid Corporation of India Limited (PGCIL), Power Finance Corporation Limited (PFC Limited) and Rural Electrification Corporation (REC). EESL is registered under the companies Act, 1956 on 10th December 2009 and the commencement of business certificate is obtained on 11th February 2010. It is the first such company exclusively for implementation of energy efficiency in South Asia and amongst a very few such instances in the world.462 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 12.10 HUMAN RESOURCE DEVELOPMENT PROGRAMMES There is a vast potential for energy savings through human intervention. BEE and SDAs have a major responsibility for stimulating a major change in the energy efficiency ethos and practices (energy modesty) by directing the national energy conservation campaign as a mass movement and seeking wide support. In the 11th Plan, BEE will continue with their campaigns. In addition, Central government will partially fund the SDAs for their respective campaigns in the States. The following initiatives will be taken in the area of HRD: (i) Capacity building: a) Officials of BEE & SDAs abroad/ in India; b) Code officials from SDAs, urban & municipal bodies for promoting & enforcement of energy conservation building codes; c) Orientation programs every year for senior officials from Central & State Govt. departments to review the achievements, impediments and strategies to step up the tempo of energy conservation. (ii) Capacity building for new breed of professionals: a) energy managers/auditors being developed under the EC Act from 2003 by BEE through National Certification Examination by offering Refresher training modules for lifelong training for Energy Auditors & Managers; b) Tutorial /help-line support for prospective candidates in the national examination for energy managers/auditors. (iii) Demonstration centres in 2 industrial estates to showcase and convince the entrepreneurs & plant engineers/technicians for industrial energy efficiency products/technologies. (iv) Orientation workshops on energy efficiency for top management, middle level executives and shop floor operating personnel. (v) Farmers training by display of energy efficient pump-sets & other relevant products. (vi) Training to drivers in road transport on fuel efficient driving. (vii) Nationwide campaigns: a) through media; b) awareness programs for general public & institutions in state capitals and other locations; c) painting competition for school children; d) Eco clubs activities for youth clubs (viii) Introduction of the modules on energy efficiency/DSM in the curricula of a) schools b) technical institutes engineering colleges c) other degree/ postgraduate courses including MBA programs. 12.11 OTHER TECHNOLOGIES/AREAS FOR ENERGY CONSERVATION Award for manufacturer offering the most energy efficient appliance models Appliances manufacturing companies may have started producing energy efficient, star rated models. However, they also produce a wide range of models that are cheaper and popular but energy inefficient. An award will incentivize the manufacturing companies to offer more energy efficient models and will act as recognition of their commitment to energy efficiency. The Ministry of Power already has the National Energy Conservation Award (NECA) scheme to recognize the innovation and achievements in energy conservation & efficiency by the industry, and the above proposed award can be a part of the scheme. ENERGY EFFICIENCY RESEARCH CENTERS Setting up of 10 energy efficiency research centres for selected energy consuming sectors may be considered in collaboration with the Department of Science & Technology (DST). Based on a model appropriate for India, BEE may invite offers from academic institutions, manufacturing associations & ESCOs and offer funding for initial set up, partial running and maintenance cost for the first 5 year period. The financial budget requirement for this activity is Rs. 200 crore in 12th Five Year Plan. Other Strategies and Initiatives Other strategies Encourage planners and regulators related to energy and technology up gradation sector to adopt integrated resource planning in the entire value chain of activities, right from extraction or procurement, and conversion to final end use. New areas/initiatives¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 463 Railways The Indian Railways in past has undertaken many initiatives to conserve energy. However, still many opportunities may exist for improving the energy efficiency in the railway sector as a whole. Given the energy saving potential that may exist in this sector, it is proposed to initiate studies and various schemes in coordination with the Ministry of Railways. Additional sectors A few additional sectors are proposed under the 12th Plan, where possibilities to reduce energy consumption exist, which are not presently/ adequately covered under the existing BEE schemes. These include the defence establishments like ordinance factories (purely on a voluntary basis), Public Sector Units (PSUs) township and large engineering/ manufacturing industries. Lighting Centre of Excellence Creating a demonstration centre on lighting technologies (Lighting Centre of Excellence) to showcase energy efficient lighting technologies, may be considered in the 12th Plan. 12.12 CONCLUSION AND RECOMMENDATIONS The target of energy saving which may be achieved in the terminal year 2016-17 of 12th Five year Plan as a consequence of Demand Side Management (DSM), Energy Efficiency and Energy Conservation schemes as proposed in the plan is expected to be 44.85 BU (at consumer side) which is equivalent to 60.17 BU at the Bus bar side. The equivalent avoided peaking capacity is estimated to be 12,350 MW at the end of the 12th five year plan. In addition to the electricity saving, total thermal energy saving equivalent to 21.30 million tonne of oil equivalent (mtoe) in the Industries & SME, Transport sector and Energy Conservation (EC) award is also expected to be achieved in the terminal year of 12th Plan. The details of target of energy saving during 12th Plan as well as corresponding fund requirement for various programmes initiated by BEE are summarized in following table. Energy Saving Targets for 12th Plan Total Fund Total Fund Targeted Targeted Sr requirement in requirement in Sectors Schemes Electricity Thermal Fuel No schemes (Rs. In sector (Rs. In Saving, BU Saving, mtoe Crore) Crore) DSM Programme 1 Utility Based DSM 75 75 - - for Utilities Industries 690 11.96 10.41 2 Industries 745 SMEs 55 1.83 1.59 Bachat Lamp 3 Residential Sector 22.50 22.50 4.40 - Yojana Standards & Equipment & Labeling 133 10.40 4.30 4 1033 Appliances (S & L) SEEP 900 4.21 - Agricultural 5 Agriculture Sector Demand Side 80 80 0.70 - Management ECBC & Energy 6 Commercial Sector Efficiency in 35 35 5.07 - Existing Buildings Municipal Demand 7 Municipal Sector 25 25 0.47 - Side Management State Designated 8 SDA Strengthening 140 190 - - Agencies State Energy 50 - - Conservation Fund464 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Total Fund Total Fund Targeted Targeted Sr requirement in requirement in Sectors Schemes Electricity Thermal Fuel No schemes (Rs. In sector (Rs. In Saving, BU Saving, mtoe Crore) Crore) National Awards, National Awards, 9 Painting & 100 100 3.42 5.00 Painting & Awareness Awareness Innovative Energy Efficiency 10 118 200 - - Technologies/Areas Research Centre 11 HRD HRD 65 288 - - Total 2488.50 44.85 21.30 Total electricity saving at demand side, BU 44.85 Total electricity saving at Bus bars, BU 60.17 Following recommendations/new initiatives are suggested for 12th Plan. • Continuation of on-going Schemes/Programs by Bureau of Energy Efficiency and Ministry of Power • State designated agencies (SDAs) in different states need to play a very important role in terms of carrying forward various energy efficiency initiatives at the state level. The thrust of the SDA program during the 12th Plan will be on strengthening the 32 SDAs which would enable them to implement various programs and activities initiated by BEE or SDAs themselves. • In the 12th Plan, it is proposed to set up State Energy Conservation Fund (SECF) in all the States and pursue with SDAs for constitution of SECF in the states to implement various energy conservation activities and utilization of fund under SECF. Matching contribution may be made by the state governments to the SECF. The proposed activities in 12th Five Year Plan under Standard & Labelling Programme (S&L) for equipments and appliances include: • Inclusion of at least 5 selected new equipment and appliances. Standby power loss reduction in few of the electrical appliances will also be focussed in the 12th Plan. • Awareness creation among all the stakeholders, • Undertaking of check testing, label verification, market impact assessment for appliances/ equipments covered under S&L scheme and • Up-gradation of energy performance standards for equipment/ appliances covered during 11th Plan. Under the labelling scheme, the following activities are proposed • Introduction of fuel economy norms effective from 1st year of 12th Plan, • Technical study for 2 & 3 wheelers and commercial vehicles (Truck & Buses) to finalise S&L programme ---+++---¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 465 Chapter 13 REQUIREMENT OF PEAKING POWER AND RESERVE MARGIN 13.0 BACKGROUND The National Electricity Policy, 2005 aims at achieving the following objectives. • Access to Electricity – available for all households. • Availability of Power – demand to be fully met by 2012. Energy and peaking shortages to be overcome and spinning reserve to be available. • Supply of reliable and quality power of specified standards in an efficient manner and at reasonable rates. • Financial turnaround and commercial viability of electricity sector. • Protection of consumers’ interests. While, a lot of work has been done and is under progress for achieving the objectives as envisaged in the Policy, but out of the above, objectives like Demand to be fully met, Energy & Peaking shortages to be overcome and building spinning reserves have yet to be achieved. It is expected that although in next 5 yrs or so our country may become base load power surplus but peak power deficits will still prevail. In this scenario any measures for improving the base load power situation shall not lead to the desired and targeted benefits to the economy. Consumers’ demand for electricity changes daily and seasonally. During peak times, the largest amount of electricity is needed (peak load), but a “base load” of electricity is needed year-round. Because electricity cannot be stored easily, utilities must anticipate demand, even on the hottest summer day or coolest winter day, and supply enough electricity to meet the demand. Consumption depends predominantly on the time of day and on the season. Utilities meet this demand with in-state power plants and by purchasing electricity from power plants in other states. The balancing of supply and demand is required in order to maintain a reliable electric system without a power interruption to the consumer. Energy use, as opposed to demand, is the total amount of measured electricity that consumers use over time. Demand or energy use can be divided into “base load,” “intermediate load,” and “peak load”. This helps to determine the type and quantity of power plants needed to produce the electricity at the right times. Different types of plants using different fuels or combination of fuels are needed to fulfil one or more of these three types of demand. Base load plants provide a base level of electricity to the system and are typically large generating units. Base load plants operate almost continuously (approximately 70 to 80 percent of the time), except when down for scheduled maintenance, repairs, or unplanned outages. They take a long time to ramp back up to full capacity and have limited ability to vary their output of electricity. In contrast, plants that satisfy peak demand (peaking plants) are highly responsive to changes in electrical demand. They can be turned off and on relatively quickly. However, they typically operate less than 20 percent of the time. Peaking plants are most often either reservoir based Hydro projects or Pumped storage systems or natural gas combustion turbines/ gas engines. The cost and flexibility of intermediate load plants fall in between those of base and peak load plants. These plants are designed more specifically for cyclic operation, or they can be older coal plants that have become too expensive to run as base load plants. They normally operate during times of elevated load demand, between 30 and 60 percent of the time. Compared to peaking plants, they are generally more efficient or utilize a cheaper fuel source and, therefore, cost less to operate. A system that is designed for base-load generation will lack the characteristics to respond dynamically or efficiently to the variation in demand within a short time. Apart from variation in demand, there is expected to be wide variability in generation as well, when the installed base of renewable energy plants increases as a result of pressure on Discoms to source their requirement from renewable energy sources (to meet RPO). Since system stability requires matching of generation with the demand at all instances of time, a certain degree of flexibility and ability of the generators to respond rapidly to the changing demand/availability for RE sources must be introduced into the system through appropriate generation plants.466 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 13.1 CAPACITY RESERVE/RESERVE MARGIN (RM) A reserve margin is the electric generating capacity the utilities maintain beyond demand to handle unpredicted needs and shut downs, both planned & forced. It is the generation capacity above the annual peak requirement. Normal practice requires utilities to maintain at least a 15 percent reserve margin in their electric generation planning. Reserve Margin (RM) = (Installed Capacity – Peak Load) / Peak Load In spite of having a significant reserve margin the system has a high loss of load probability. This is due to the following factors: i) The outages both forced and due to maintenance are high. ii) The share of Renewables which is about 10% does not generate during peak hours and are of highly non- dispatchable in nature. iii) The share of Hydro projects is about 23% and the energy of the hydro projects is relatively low. 13.2 OPERATING RESERVES Operation of Power System has to be made to meet the load forecast. Secondly, utilities make forecast for a planned load or schedule to deliver equal amount of power. However, the actual availability of power or the actual load may be different from what was forecast, due to a number of reasons like extreme weather conditions or unscheduled outages to generation units. Thus generation and distribution have to be managed by what are known as frequency control reserves. The system has to have certain surplus spinning capacity to immediately meet the change in forecast demand. System reserves can be classified into i) Primary Control Reserves or Frequency Control Reserves ii) Secondary Reserves or Spinning and Non-spinning Reserves iii) Tertiary Reserves or Replacement Reserves • The spinning reserve is the extra generating capacity that is available by increasing the power output of generators that are already connected to the power system. For most generators, this increase in power output is achieved by increasing the torque applied to the turbine's rotor. The frequency-response reserve (also known as regulating reserve) is provided as an automatic reaction to a loss in supply. It occurs because immediately following a loss of supply; the generators slow down due to the increased load. To combat this slowing, many generators have a governor. By helping the generators to speed up, these governors provide a small boost to both the output frequency and the power of each generator. However, because the frequency-response reserve is often small and not at the discretion of the system operator it is not considered part of the operating reserve. The deployment of the primary control reserves is from 0 to 30 seconds. The primary frequency control systems are activated if the frequency deviation is more than the dead band of the controller. Half of the primary control reserves should be in operation in 15 seconds, and all reserves should be in full power in 30 seconds. • The non-spinning or supplemental reserve is the extra generating capacity that is not currently connected to the system but can be brought online after a short delay. In isolated power systems, this typically equates to the power available from fast-start generators. However in interconnected power systems, this may include the power available on short notice by importing power from other systems or retracting power that is currently being exported to other systems. The secondary reserves should be activated within 30 seconds and they should be in full output within 15 minutes. The activation is done automatically. The secondary control reserves should release the primary reserves for the next disturbance in the system. • Tertiary Reserve/Replacement Reserve: Tertiary control actions should free the secondary control reserves in 15 minutes from the start of the disturbance. Part of the actions will be taken automatically and some manually. Automatic actions are typically initiated when the frequency drops below the given limits. The manual actions are initiated by starting the reserve power plants (non-spinning reserves), or by increasing the load of the operating plants (spinning reserves). Tertiary control is based mainly on manual actions initiated by the operator. The time periods over which all three kinds of reserve power operate is illustrated in the diagram given below.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 467 13.3 REQUIREMENT OF RESERVE PLANTS The Optimal power system should have about 15-20 % reserve plants, about 20-30% peaking plants, 10-20 % Intermediate plants, and about 50-60% Base load plants. In Indian power system also, the standard frequency control reserves are also need to be created. These are reserves which are primarily reserved to meet the distribution in the system. The reserves should be activated within a period of 30 seconds and should give full output within the next 15 minutes, with a view to release the primary control reserves. In addition the system should have tertiary reserves also which can take over from the scanty reserves within fifteen minutes of the disturbance and release these scanty reserves. These are generally non spinning reserves which can be brought into service at very short notice. As such it is important to discuss as to what should be the quantum of each of these resources. 13.4 PRACTICES IN DEVELOPED COUNTRIES As regards the Reserves in the Power System, in developed electricity markets abroad, it is customary to have several layers of reserves to meet the contingencies. The first rapid response to a drop in frequency of say 0.1 to 0.2 Hz is to bring on line a hot reserve plant (equal to the largest single unit in the grid) in 5-30 seconds, through automatic generation control (AGC). As a second step, fast reserve power plants (FRPP) are started in 4-15 minutes and ramped up to full load, after which the AGC plant will retreat to reserve mode. As a third step, replacement reserve power plants (RRPP) come on in 45-60 minutes, after which the FRPP plants return to their stand-by mode. These reserves are as illustrated in Figure 13.1 below:468 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Figure 13.1 To restore first To restore To come on line if response second response frequency drops by plants to plants to standby 0.1 or 0.2 Hz normal The several layers of reserves as planned in the developed countries also take care of the flexibility of operation of the various reserves. Therefore hot reserve which is required to operate within seconds is generally provided through Automatic Generation Control (AGC). The fast replacement reserve is required to be from a generation source which is capable of ramping up within 4-15 minutes to take over from the AGC sources. However Replacement Reserve Capacity could be from slower acting generation source to take over from fast acting reserves. Accordingly, each of these reserve capacity has to be from appropriate generation source having the requisite ramp up and ramp down characteristics. The rule that the grid operator generally uses is that they must always have an ability to replace the loss of the largest generating unit. It can of course be replaced from multiple sources, including imports. Because of the hydraulic and import abilities, they don’t need to keep fossil units running very much just for spinning reserve (but they do warm them up in advance of forecasted demand). Nuclear can not be used for spinning reserve. It is either on or it is off. The same is true of co-generation or combined heat and power installations. Our suggestions on Reserves 1. About 10,000 MW of the capacity which will be operating at lower PLFs would ramp up to meet the sudden peak in demand and these will be our primary control reserves 2. The supplemental reserves or secondary reserves can be the hydro stations with storage, pumped storage plants or Gas engines which can be activated within 30 seconds and can be in full output within 15 minutes. 3. The tertiary reserves can be some old oil or coal fired stations which can be activated manually and free the secondary reserves for fresh disturbances. Indian System The load duration curve of the country reveals that the duration of peak demands being shorter, it may not be economically viable to depend on purely base load stations to meet such peak demands. It makes more sense to set up some power plants for operating only during peak period. However, such plants would require a different tariff structure to recover their costs. Differential tariff structure for peak and off peak periods for the existing generating plants as well as for the new peaking power plants can to a large extent address this problem. The non-pit head power plants and coastal plants based on imported coal with higher variable charges may have to alter the load during the day depending on the load demand. During the off-peak hours also, such coal based plants may continue to operate, though at reduced load.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 469 The following figures shows projected all India load duration curve for 2016-17: 13.5 REQUIREMENT OF PEAKING POWER Power supply position in the country indicates continued energy and peaking shortages. While the energy shortage makes it imperative to set up base load stations, the peak shortage underscores the need for separate dispensation to meet demands during peak periods. Peaking demand in Indian states has been met, to an extent, by purchasing power from other states through bilateral agreements or through the mechanism of Unscheduled Interchange (UI) at frequency-linked prices and sometimes by load shedding also. Hydro power plants also can be started up quickly to meet sudden peaks, but this facility is restricted to those few states that have adequate water storage, all through the year. Peaking power can ideally be provided by pondage / reservoir based hydro plants. However, hydro capacity alone may not be able to meet the peaking demand. Fast response during peak hours could be provided by the gas engine based generation because of their excellent peaking support capability. Given the continuing peaking shortages on all India level and the region specific or State specific shortages there is a need for peaking power plants. At the same time, given the fact that energy shortages also persist we would continue to need investment in the base load / intermediate load stations. The major capacity addition is expected in hydro, coal and renewable. Hydro capacity addition though small is also mainly in run of the river type or with small pondage. No peaking stations are under execution except 1000MW pumped storage scheme at Tehri, & Teesta Stage V. Thus there is an urgent need to plan for peaking capacity. It would also be desirable to operate the combined cycle gas based capacity to meet mainly the peaking and intermediate load demand. The trends both in terms of volume and price of electricity in the short-term market further reiterate the need for setting up of adequate generation capacity in general and peaking power plants in particular to enable the distribution companies to make long-term planning for meeting their requirements for power for base-load as well as peak-load. 13.6 OPTION FOR PEAKING POWER GENERATION The optimum base load capacity is the one which can supply energy under the Load Duration Curve (LDC) running at nearly full load both technically as well as commercially (with reference to its cost of operation and efficiency). On the merit order the demand is first met from nuclear or renewable energy sources or run of the river hydro stations and hydro plants with storage which have to release water to meet irrigation requirements which are must run, followed by generation from pit head coal based station, followed by load centre and coastal coal based stations, and combined cycle gas based station. Balance demand could be supplemented further by peaking power plants, namely, storage type hydro generating station including pumped storage schemes, open cycle gas turbine station, and gas based reciprocating engines. Peaking plants shall be environmentally-friendly and must comply with emission norms, so as to be located close to load centres. They must be able to start up (and stop) instantaneously and ramp up quickly, and in required steps, to match the spike in load. Their efficiency curve must be high and flat at different plant loads. They must be ‘all-season’ plants and use a fuel which is available throughout the year. A comparison of various types of peaking alternatives and their economics in term of objective function being minimum are as given in Table 13.1 below:470 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Table 13.1 Type Capital Effici- Fixed Variable Obj.fn Rs.Cr. % Change cost ency O&M O&M Cr/MW % Rs/kW Rs/MWh 2017 Ext. period 2017 Ext. period Gas Engines 3.5 43.0 842 442 49991.3 357145.2 - - Gas (Duel 4.0 42.2 870 442 50228.4 358514.8 0.47 0.38 Fuel) Diesel HFO 3.0 43.5 1270 663 50232.9 359198.1 0.48 0.57 OCGT 3.0 37.8 876 731 50241.9 359270.5 0.50 0.60 Peak load management can be very useful in the short term. It can be developed further with remote measuring and a new load based tariff system or time of the day metering & tariff. However, as there is a significant demand during peaking specially in cities and big towns separate peaking plants are to be setup. These are to be distributed generating plants or stand alone plants supplying peak demand. With the National grid in place the role of distributed plants is to meet the peak load and reserve loads. Distributed power can be a major source to meet the peak demand in the future. In peak load service the most profitable investments are the gas & Diesel engine plants and aero derivative gas turbine plants. The most common applications of the internal combustion engines are in standby and reserve capacities. They are distributed in hospitals, super markets, airports, nuclear power plants and industrial facilities to ensure safety in case of blackout or in a sudden spurt of demand. Typical diesel engines can be synchronized in one minute, and can deliver full output within 3 minutes. Gas Engines can be synchronized in 2 minutes and can deliver full output within 8 minutes. An Aero derivative gas turbine can be synchronized within five minutes & can deliver full output in ten minutes. These options may be considered to meet the peak demand and the tariff may be as per CERC guidelines for peaking tariff. 13.7 ISSUES IN PEAKING PLANTS Peaking plants are generally gas turbines/engines that burn natural gas or Pumped storage systems. A few plants burn petroleum-derived liquids, such as diesel oil and jet fuel, but they are usually more expensive than natural gas, so their use is limited. However, many peaking plants are able to use petroleum as a backup fuel. The thermodynamic efficiency of open cycle gas turbine power plants ranges between 30 to 42% for a new plant. Reciprocating gas engines are also good options for the peaking plants near the load centres and can provide higher efficiency of about 44-48%. It is now stated that even CCGT can work on load shift basis as peaking stations. The hydro generating stations, other than run of the river type, can be operated, as and when required. In these stations water can be stored during off-peak hours so as to generate more power during peak hours. As such these hydro generating stations are normally used as peaking power stations. The pumped storage hydro generating station is also a good option for meeting peak demand. Similarly we may also have to plan some GTs / Reciprocating Gas Engines to meet the peaking requirements. These plants will be expected to be operated for about 6-8 hours a day. It is recommended that part of such plants may be constructed near the metro cities in the vicinity of existing or proposed gas grid. Besides meeting the peaking demand these plants could also be operated during the system contingencies such as low voltage, transmission constraints, etc., thus adding to reliability of power supply of the metro city. Operation of CCGTs in peaking mode as suggested above and OCGT for peaking may result in higher heat rate and O&M costs (on account of higher repair and maintenance cost) for which the power plant will have to be compensated. Most of the combined cycle plants have modules with 2 GTs and 1 steam turbine. It is proposed to close down 1 GT in each module after the evening peak hours and restart at the commencement of the morning peak hours. Thus, during night hours such plants may operate at about 50% capacity. Some modern combined cycle gas based plants have single¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 471 shaft configuration with 1 GT and 1 ST. Such unit may have to be closed down completely during night hours after evening peak hours or may have to be operated at partial load during off-peak night hours. Allocation of gas to the CCGT plants connected to gas grid from domestic sources corresponds to operation of these plants at a PLF of 70 to 75%. Cyclic operation of CCGTs in the manner indicated above will be optimal use of available gas. Presently, GAIL does not allow wide variation in withdrawal of gas by power plants. However, with increase in pipeline capacity such variations may be possible in near future. Matter will have to be taken with GAIL in this regard. 13.8 PEAKING TARIFF Operation of Combined Cycle plants in peaking mode as suggested above and Open Cycle plants in peaking mode may result in higher heat rate and O&M costs (on account of higher repair and maintenance cost) for which the power plant will have to be compensated. Therefore, it is obvious that peaking power would be costlier as compared to off peak power. To determine the peak and off peak tariff a Task Force under the chairmanship of Shri Rakesh Nath, then Chairperson, CEA was constituted by CERC and the task force has already submitted the report. The notification for separate tariff for peak and off peak power would help in flattening of Load Duration Curve and ultimately it would result in lesser capacity addition to meet the same power demand in the country. 13.9 POLICY INITIATIVES FOR PEAKING POWER PLANTS Provision in Act Inception of peaking power plants would require initial Policy support to start off with. There are following regulatory enablers that provide for the provision of the same. Relevant stipulations under Electricity Act 2003 are i. Section 61 (b),(c)&(e) of the Electricity Act, 2003: States that the Appropriate Commission, in specifying terms and conditions for determination of tariff, shall be guided by : a) Commercial principles b) Encouraging efficiency, economical use of resources, good performance and optimum investments c) Rewarding efficiency in performance ii. Section 62(3) of the Electricity Act, 2003: The Act contemplates certain specific factors which may form the basis to justify differential tariffs, including a) Total consumption of electricity during any specified period; b) Time at which supply is required; c) Nature of supply; and d) Purpose for which supply is required. In the above, efficiency and rewarding efficiency performance needs special mention during formulation of peaking power policy. As consistent with the nature of Peaking, technology used for meeting such needs should have certain specific characteristics which are listed as under: • Fast start up & shut down times • Fast ramp up rate • Wide load range • Black start capability • Un restricted up/down times • Fuel flexibility • Low emissions In the bidding process for selecting dedicated peaking power plants, a critical evaluation needs to be done on above parameters. Plants specifically dedicated for peaking, shall be a part of planned capacity addition and like the renewables, a target figure of 10% of installed capacity by 2020 may be incorporated for peaking power plants. This will optimise the generation mix, where “Base Load Plants” can run on high PLF & the “Peaking Power Plants” can meet the cycling472 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] requirement at different times of the day and also complement infirm nature of renewable energy plants. This will result into huge economical benefit in terms of operational & capital expenses. Gas based power plants are amongst the best available options for meeting the peaking power needs. Also as Natural gas is a scarce resource it needs optimal utilization. For gas based peaking power generation, cost of generation would be on higher side if domestic fuel is not allocated. Hence, for gas based peaking power plant, there could be separate allocation of Domestic Natural Gas. Specific quantity of domestic gas may be allocated for peaking plant for assuring reasonable cost to DISCOMs. Initially introduction of about 2000 MW dedicated peaking power capacities is envisaged which would need about 2 MMSCMD of natural gas (@ 25% PLF). Such Plants should be located in five metro cities (400 MW each). In this regard, a Task Force has been set up under the Chairmanship of Chairperson, CEA to look into all aspects related to setting up of peaking power plants. The report of the Task Force is expected soon. Legislative and policy support required 1. In line with National Electricity Policy, notification of Peaking Power Policy needs to done which provides necessary directives to mandate the State distribution companies to provide universal access to power (by every section of society – rural, urban, agricultural) and unrestricted availability of power to all. 2. It is necessary to mandate the Regulators to implement “load shedding free system” by allowing differential tariff in different times of day or for different users in a phased manner to recover the cost of power. 3. Power purchase from dedicated peaking power plants should be based on an auction system (like Case 2 bidding ) with plant characteristics defined in the bid document as: • 6 hours/day operation split into multiple starts and stops • Capability to start and reach full load within 10 minutes and stop within 2 minutes CERC could be assigned the task of preparing model bidding document. In the above context, two directives could be issued :- (i) Existing Power Plants designed for base loads shall not normally participate in auction as Peaking power plants. This emerges from the very fact that if the existing plants had excess capacities to offer under ‘Peaking’, then there would not have been any necessity to shed or restrict the power supply to the extent it prevails today in India. Most of the rural areas in our country get only 4 to 6 hours of power supply daily, while the cities suffer restriction of various duration from season to season. (ii) Also if existing plants are allowed to supply peaking power as well, it may lead to a situation where a generation company defaults in its base-load supply commitments to a distribution company to cater to peaking requirements in some other parts of the country to unduly make profit. This will also ensure additionality of capacity suited for the peaking plants at much lower capital cost and higher efficiency. It is important to ensure that distinction is made between “peaking plants’ and ‘base load plants’ as use of same plant for both the purpose, will only result in profiteering by a section of base load operators by diversion of capacity in peak time. 1. In the formative years, say 5 years from date of issuing the Peaking Power policy, the State and Central Electricity Regulators may approve procurement of power by DISCOMs from “new plants” set up as “Peaking Power Plants” either in public or private sector when the plant capital cost is established by the plant owner based on competitive bidding and the gas price to be pass through. CERC with assistance of CEA may be mandated to define a model tariff formula based on suitable normative parameters. Suitable policy measure coupled with effective implementation plan will help Indian electricity sector to come out of the problems of load-shedding & take the country forward on the path of 24x7 uninterrupted power supplies and thus becoming a powerful enabler to the economic growth & stability. However, there is a need to ensure that such measures lead to the new capacity – “Peaking Power plants” in the system.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 473 Duration of peak and off-peak hours For daily recovery of peak hour capacity charges, the peak hours in a day may be considered as 6 hours in case of thermal generating stations and 3 hours in case of hydro generating stations to be declared by the National Load Dispatched Centre from time to time. Basis for differentiation of peak and off-peak tariff The prices should be differentiated for peak and off-peak supply and the tariff should include variable cost of generation at actual levels and reasonable compensation for capacity charges. It would be necessary that a distinction should be made between drawl of power in the peak and off-peak time. Over- drawls in peak time should be over a stiffer surcharge compared to over drawls in off-peak time – (say 10% to 50% of fixed charges), as may be decided in the REB. 13.10 ISSUES IN INDIA India being in a deficit situation so far really does not have any reserve plants to meet the sudden demand spikes. But while planning for the future with 5% spinning of reserve and the fact that India is becoming a competitive market reserve plants need to be identified/ designated. It has been represented by various stake holders that the criteria of 5% spinning reserve needs to be reviewed as India can’t afford to have 5% spinning reserve in terms of Investment. The Task Force set up for Peaking & Reserve Plants is deliberating on this issue and decision to reduce the desired spinning reserve in the system may be taken based on report of the Task Force. 13.11 OPTIONS AVAILABLE / SUGGESTED In India one option to have reserve margin could be construction of reserve plants with proper regulatory support. The other option that could be operation of plants below declared capacity, so that in case of sudden demand additional power could be generated. In planning exercise to carry out study for additional capacity requirement in future plans, the availability factor is reduced to meet the requirement of 5% reserve margin in the system. 13.12 RECOMMENDATION It is recommended to plan for at least 2000 MW gas based peaking power plants during 12th Plan, 400 MW each at/near five major metro cities of India. The experience gained from operation of these peaking plants would pave the way for creation of additional peaking plants in other major cities and higher capacity in future plans. It has been suggested by various stakeholders that instead of 400 MW each at five metro cities, smaller peaking power plants of 100-150 MW each distributed in all areas/cities of India with proper regulatory support may be set up. A Task Force under Chairperson, CEA has been set up to deliberate upon all the issues related to peaking power plants. The size & locations may be considered based on the Task Force Report which is likely to be submitted soon. ---+++---474 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Chapter 14 CONCLUSIONS AND RECOMMENDATIONS The National Electricity Plan includes a review of the 11th Plan, detailed planning for the 12th Plan and Perspective 13th Plan projections. Planning Studies have been carried out, considering Demand as projected by the draft 18th EPS Report. Based on results of studies following recommendations emerge. (1) 12TH PLAN CAPACITY ADDITION REQUIREMENT (i)-A Capacity addition of about 87,100 MW would be required to be added in the country during the 12th Five Year Plan considering actual capacity addition of about 54,964 MW during the 11th Plan, spinning reserve requirement of 5% as per NEP, retirement of old inefficient thermal units of about 4,000 MW and revised reliability criteria of CEA. Four scenarios have been worked out corresponding to low renewable/Low Gas (BASE CASE), Low Renewable/High Gas, High Renewable/Low Gas and High Renewable High Gas. (ii) High priority has been accorded towards development of renewable, hydro, nuclear and gas based projects in order to minimize CO emissions. Hydro capacity addition of 10,897 MW has been considered during 12th Plan based on 2 progress of actual construction at project site and taking into account uncertainty in development of hydro projects relating to geological surprises, natural calamities, R&R and environmental issues. Renewable capacity of 18,500 MW during 12th Plan has been considered for planning studies to work out balance thermal capacity additions required. A nuclear capacity of 5,300 MW has been proposed as per the information furnished by NPCIL. Gas based capacity of 2,540 MW has been considered. (iii) The total capacity addition requirement in the country for 12th Plan under Base Case Scenario has been worked out as under: Total Capacity (excluding renewable) - 87,100 MW Hydro - 10,897MW Nuclear - 5,300 MW Thermal - 70,903 MW • Coal - 67,843 MW • Lignite - 520 MW • Gas - 2,540 MW (iv) As per the 12th Plan target of 88,537 MW set up by the Planning Commission, projects totalling to 88,537 MW has been identified as per following details: Total Capacity (excluding renewable) - 88,537 MW Hydro - 10,897MW Nuclear - 5,300 MW Thermal - 72,340 MW • Coal - 69,280 MW • Lignite - 520 MW • Gas - 2,540 MW (2) 13TH PLAN CAPACITY ADDITION REQUIREMENT A capacity of 86,400 MW would be required to be added in the country during 13th Plan considering capacity addition of about 88,000 MW during 12th Plan. Four Scenarios have been worked out corresponding to four Scenarios in 12th Plan i.e. Low Renewables/Low Gas (BASE CASE), Low Renewables/High Gas, High Renewables/Low Gas and High Renewables/High Gas. The total capacity addition requirement in the country for 13th Plan under Base Case has been proposed as under: Total Capacity - 86,400 MW (excluding renewable) Hydro - 12,000 MW Nuclear - 18,000 MW Thermal - 56,400 MW • Coal - 56,400 MW • Gas - 0 MW¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 475 • Renewable 30,500 MW Hydro Import – 8,040 MW It may be mentioned that 18,000 MW nuclear capacity during 13th Plan has been considered as per the programme of NPC. In case this capacity does not materialize, the same could be replaced by coal based capacity. (3) MAJOR ISSUES With a view to expedite new capacity addition, following issues may be addressed expeditiously: (cid:1) Availability of land and water. It is suggested that every States Governments have a land survey done for prospective industrial project sites in respective States to reduce project completion schedule. (cid:1) Ensuring faster Environment and forest clearance of the project to avoid the cost & Time over run. (cid:1) To incentivise new BOP manufacturers and the existing manufacturers to increase their capacity and/or diversify, in order to meet the complete demand of the new power generating capacity. This would also be instrumental in introducing competition and reducing prices. (cid:1) To incentivise setting up of more number of erection and commissioning agencies to meet the rapidly growing requirement. (cid:1) Logistics for movement of heavy machinery like roads and bridges must be improved. (cid:1) Making the key inputs available like Cement, Steel, etc. These need to be tied up well in advance. (cid:1) Human resource development commensurate with the requirement of the various skilled and unskilled manpower is essential. (4) POLICY INITIATIVES In order to realise the massive capacity addition requirement during the 12th and 13th Plans within the ambit of a Low Carbon Growth Strategy, a number of Policy Initiatives and Measures need to be taken. They are as summarised below: (i) Central Electricity Authority (CEA) has been carrying out Integrated Power Planning for the country as a whole. The States are responsible for State specific planning for generation, transmission and distribution with a view to optimally utilize resources and to meet their demand. Earlier, State Electricity Boards which were integrated entities were doing integrated power planning for the States. After unbundling of power sector in the States and formation of generation, transmission and distribution companies, there is no single organization responsible for integrated planning and coordination with CEA. It is proposed that integrated planning of generation, transmission and distribution systems within each State may be done by a single agency. To facilitate this each State may appoint a suitable Nodal Agency for this purpose which shall coordinate with the generation and distribution utilities in the States. (ii) National Electricity Policy stipulates that a spinning reserves of 5% needs to be provided in the system. However, this implies a large capacity to provide spinning reserve which would otherwise be idle in the system. Since this implies setting up of power projects involving huge sum of money , which are required to operate only under emergency condition, it is suggested that the amount of spinning reserves may be reduced to Largest unit size + fraction of peak load (1 % may be considered). For the 12th Plan, this corresponds to about 3000 MW. The Task Force set up for peaking & reserve plant may deliberate upon this issue. (iii) Earlier the generation planning exercise was carried out corresponding to reliability criteria of 1% LOLP and 0.15% ENS. While planning for 12th & 13th Plan capacity addition the reliability criteria has been made more stringent and the criteria adopted is LOLP of 0.2% and ENS of 0.05%. It is felt that as more and more generation capacity is added, the planning norms should be made more and more stringent to improve the reliability of generation. (5) ISSUES RELATED TO COAL AVAILABILITY (i) Coal Requirement by the End of 12th Plan. In order to meet this generation requirement, coal requirement (at SPCC 0.72 Kcal/ Kg) works out to around 842MT. Against the requirement of 842 MT, 54 MT coal is to be imported by Thermal Power Stations designed on imported coal. SCCL has confirmed a coal availability of 35 MT and around 100 MT coal is expected to be available from476 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] captive coal blocks. Thus, 788 MT coal needs to be made available by CIL against which they have committed to supply 477 MT. Thus, CIL is to be impressed upon for formulating exigency plan to enhance their production to meet the requirement the power stations. The availability/shortfall of indigenous coal is detailed below: (i) Coal requirement during the year 2016-17 = 842 MT (ii) Coal availability from : (a) CIL = 477 MT (b) SCCL = 35 MT (c) Captive Blocks allocated to Power Utilities = 100 MT Total, coal availability = 612 MT (d) Coal to be imported by TPSs designed on imported coal 54 MT Shortfall = 176 MT In order to bridge the above gap between demand and coal availability as referred above, Power Utilities are expected to import around 117 MT to meet shortage in coal supply from CIL. This quantity of imported coal would be in addition to 54 MT coal likely to be imported by Thermal Power Stations designed on imported coal. Therefore, the total quantity of coal expected to be imported is about 171 MT. (ii) Limited availability of coal for running of power stations is a matter of grave concern. Following initiatives therefore need to be taken:- a. Use of domestic coal in a judicious and most appropriate manner. Due to shortage of domestic coal, import of coal may also be tied up. A Policy decision may have to be taken to allocate coal only to super critical power plants in future. b. Other Initiatives which needs to be taken to ensure availability of coal to power plants are as follows: • Acquisitions of fuel assets abroad by power developers, coal companies and other industries and tieing up of import of coal on a long term basis. • Development of specialized ports/jetties well-equipped with adequate coal handling infrastructure. • Priority to Power Sector in berthing at ports. • Development of adequate port, railways and roads infrastructure for transportation of coal to power projects. • Additional availability of Railway Rakes and augmentation of tracks / sections commensurate with increasing requirement for transportation of coal from pit head to power plant. • Availability of wagons in conformity with the unloading facilities available at TPSs. • Expeditious implementation of express freight corridor. • Deficiency in mining agencies and equipment to be overcome • Upgradation of coal mining facilities, desired quality of coal etc. • Adequate crushing facilities at mine head. • Expedite setting up of rapid loading system/ Silos at coal mine head. • Construction of Dedicated Freight Corridors to be expedited. • Allocation of coal mines on tariff based bidding like Case II tariff based biding for power projects. • Compress time taken for development of coal blocks • Coal mining may be allocated to private parties on cost/time basis. • Setting up of coal washeries for reducing burden on railways and to improve efficiency of power stations. • Development of Coal Blocks. (6) ISSUES RELATED TO GAS AVAILABILITY AND NEED FOR PROMOTION OF GAS BASED GENERATION IN THE COUNTRY (i)So far gas available from KG basin has been allocated to existing projects only and Power Sector has been given 2nd priority in gas allocation next to Fertilizer Sector. It is recommended that power projects be given highest priority as far as domestic gas allocation is concerned in view of power shortage in the country and very low emission from gas plants which will help us in restricting CO2 emissions from power sector. In view of expected coal shortage during 12th Plan, it would be desirable to plan for about 25,000 MW gas based projects in next few years to meet the capacity addition target and also to reduce our total CO2 emission.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 477 (ii) Total Gas Requirement by Terminal Year of 12th Plan (2016-17) The total gas requirement during terminal year of 12th Plan(2016-17) works out to about 178 MMSCMD as summarised below: GAS REQUIREMENT FOR TERMINAL YEAR OF 12TH PLAN (2016-17) * Gas requirement by 11th Plan end (corresponding to 88 MMSCMD existing capacity of 18381 MW as on 31.03.2012) Requirement for 12th Plan Projects (for 25,000 MW 90 MMSCMD capacity) Total Gas requirement by 12th Plan end(2016-17) 178 MMSCMD (iii) Need for Promotion of Gas Based Generation in the Country There is urgent need for promotion of gas based generation in the country due to inherent advantage of these power plants, as given below: Load profile in the country and the role of gas based power in addressing the requirements reliably: CERC has encouraged setting up of peaking capacities by prescribing peaking tariffs for different category of plants including pumped storage schemes. Hydro projects have taken much longer gestation period for development and construction and as a result hydro power share in the country’s generation capacity mix has continuously slipped. It is in this context that gas-based generation can play an important role in meeting peak/intermediate load requirements far more reliably compared to other available options. Shorter construction periods Gas-based power plants can be constructed in a much shorter time-frame of 18-24 months relative to longer construction timelines involved in coal and hydel projects. Lesser strain on resources – land and water: Gas based plants require lesser land and water as compared to coal based plants or hydro capacities, where there is a possibility of large-scale people displacement. Considerable environmental benefits relative to coal-based power: Gas-based power is considerably cleaner when compared to coal-based power. CO2 emissions from a modern combined cycle gas turbine (CCGT)/ combined cycle gas engines (CCGE) are only 0.35 kg/kwh in contrast with 0.83 kg/kwh from a 660 MW super critical unit. Diversification of fuel supply /energy security risks: Availability of domestic natural gas, though anticipated to increase substantially post commencement of production from KG-D6 gas finds, has declined in the recent months. However, a calibrated approach in gas-based capacity addition combined with the adoption of appropriate policies in the natural gas sector, still makes sense to diversify fuel supply risks resulting from excessive dependence on coal. Even if part of gas requirement is to be imported as LNG, it provides diversification of source countries from where energy is imported, thereby providing diversification of energy security risks. (iv) Policy changes to be adopted to encourage gas based capacity addition • Policy initiatives required to incentivize gas based plants including Combined Heating & Cooling plants having high efficiency. • Priority for gas allocation to CCHP plants. (cid:2) Duration of PPA: Duration of PPA is kept at 25 years, it needs to be brought down to 15-18 years, keeping in mind economic life of gas-based power plants. Further, normally gas is allocated for 5 Year period, as such signing of PPA need to be facilitated for 5 year period, to be reviewed from time to time in line with extension of gas allocation period upto the economic life cycle of 15-18 year of the plant. (cid:2) Fuel risks pass-through: Current domestic and international market environment for natural gas suggests that there are far too many uncertainties with regard to availability and/or price of natural gas. Developers are not ideally placed to take those risks. Therefore fuel availability and price risks need to be borne by the procurers. (cid:2) Take-or-Pay risk pass-through: Gas supply contracts are characterized by high level of Take-or-Pay obligations on fuel buyer. PPA needs to be suitably amended to alter current level (relatively low) of minimum off-take guarantees to suitably higher levels. It also needs to be ensured that gas-based plants do not face dispatch risks during their intended hours of operation (peak/ intermediate load).478 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] (cid:2) Capital cost and heat rate under competitive bidding scope: Bidding would therefore be primarily on competitively discovering capacity charges and conversion (net heat rate) efficiencies. (cid:2) Gas based peaking power if integrated into the total electricity generation system can lead to carbon reduction efficiencies even higher than renewables like wind or solar power. Hence it is suggested to extend the fiscal benefits to gas based peaking power projects at par with the renewable energy projects or Ultra Mega Projects. Specifically, zero customs duties & taxes and interest rate subsidy. (cid:2) Technical requirements for intermittent or peaking application: Bid invitation should specify these requirements as the very nature of application would influence the choice of fuel and technology. These are – (cid:2) Capable of number of stop / starts in a day in other words to operate on Load Follow Principle (cid:2) No effect on maintenance due to multiple stop / starts (cid:2) 5 to 10 minutes time from start up to full load (cid:2) 5 to 10 minutes shut down time from full load to zero (cid:2) Black start capability (cid:2) No effect on efficiency due to part load operation of the plant (cid:2) High availability - >94% (7) GREEN HOUSE GAS MITIGATION STRATEGY Green House Gas mitigation strategy needs to be adopted in order to meet the emission standards. Some of the major Initiatives proposed in view of Coal being the main stay of the Generation capacity addition in the next few plan periods are: • Increase of unit size with higher steam parameters. • Technology Development – Adoption of higher unit size & Clean Coal technologies (cid:3) Supercritical Technology – 2 percent point efficiency gain possible (cid:3) Ultra Supercritical Technology –additional efficiency 0.75% over 800 MW supercritical (cid:3) Integrated Gasification Technology – higher efficiency of 40-45% • R & M and Life Extension of old power stations – Benefits of CDM to be extended to overcome fund constraints • Energy Efficiency improvement • Retirement of old inefficient units • Coal quality Improvement Other measures include • Reduction in T & D losses – All India T&D losses- 23.79% in 2010-11. Aim to bring down to 15% • Efficiency in use of energy • Setting up of pithead stations for reduction in transportation of coal (8) DEVELOPMENT OF RENEWABLE ENERGY SOURCES Renewable Energy has been appropriately given the central place in India’s National Action Plan on Climate Change. During the 12th Plan & 13th Plans renewable capacity of about 60,000 MW is planned to be added by MNRE. (9) ENERGY CONSERVATION AND DEMAND-SIDE MEASURES Energy Conservation and demand-side measures will remain cost effective tools to bridge the gap between demand and supply of power. Three pronged approach of Energy Efficiency, Conservation of Energy and Demand Side Management assumes central role in achieving the mission of Government of India - "Power for all" by 2012. Towards this end, the power sector has to play a central role in enabling this transformation. There is a need to shift from supply domination and capacity expansion towards improvement in operational efficiency of the existing power generating stations, reduction in Transmission and distribution losses and most importantly improving the end use efficiency. Energy efficiency, conservation of energy and demand side management needs to be tapped vigorously. (10) NEED FOR PEAKING POWER PLANTS (i) It is recommended to plan for at least 2000 MW gas based peaking power plants during 12th Plan, 400 MW each in five major metro cities of India with proper regulatory support. The experience gained from operation of these peaking plants would pave the way for creation of additional peaking plants in other major cities and higher capacity in future plans. (ii) A Task Force under Chairperson, CEA has been set up to deliberate upon all the issues related to peaking power plants. The size & locations may be considered based on the Task Force Report which is likely to be submitted soon.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 479 रररााांंं श श श(cid:6)(cid:6)(cid:6)ययय (cid:8)(cid:8)(cid:8)ववव(cid:10)(cid:10)(cid:10)ुतुतुत यययोोोजजजनननााा ( ) भाग-।। पपपपााााररररेेेेषषषषणणणण [(cid:8)व(cid:10)ुत अिधिनयम, 2003 क! धारा 3 (4) के अंतगत& के' ि(cid:6)य (cid:8)व(cid:10)ुत ूािधकरण क! बा+ यता क! पूित & म]- भभभभााााररररतततत ससससररररककककाााारररर (cid:8)(cid:8)(cid:8)(cid:8)वववव(cid:10)(cid:10)(cid:10)(cid:10)ुतुतुतुत ममममऽऽंंऽऽंं ााााललललयययय ककककेेेे ''''िि िि (cid:6)(cid:6)(cid:6)(cid:6)यययय (cid:8)(cid:8)(cid:8)(cid:8)वववव(cid:10)(cid:10)(cid:10)(cid:10)ततुुततुु ूूूूााााििििधधधधककककररररणणणण uoEcj 2012480 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] शशशश(cid:2)(cid:2)(cid:2)(cid:2)दद दद ससससं(cid:7)ं(cid:7)ं(cid:7)ं(cid:7)पपेेपपेे शशशश(cid:2)(cid:2)(cid:2)(cid:2)दद दद सससस(cid:7)(cid:7)ंं(cid:7)(cid:7)ंं पपेेपपेे ििििवववव(cid:12)(cid:12)(cid:12)(cid:12)तत तत ाााारररर एबीटी उपल(cid:4)ध ता आधा(cid:10)रत टै(cid:10)रफ एसी वैकि(cid:18)पक कर(cid:19)ट एईजीसीएल असम इलेि(cid:25)(cid:26)क जनरेशन कंपनी िलिमटेड एईआरसी असम िव!ुत िनयामक आयोग एआई अिखल भारत एपीडीआरपी &व (cid:10)रत िव!तु िवकास और सुधार काय)( म एपीपी एटॉिमक पावर *ल ांट एपी(cid:26)ां,क ो आं- .दशे (cid:26)ांसिमशन कंपनी ऑग िव,त ार बी-टी-बी बैक-टू-बैक बीएसईबी िबहार रा2य िव!तु बोड ( सीईए के34 ीय िव!ुत .ािधकरण सीईआरसी के34 ीय िव!ुत िनयामक आयोग सीकेएम स6कट 7कलोमीटर सीपीपी के34 ीय िव!ुत प(cid:10)रयोजना सीपीएसयू के34 ीय साव(जिनक 8े9 उप)म सीएसईबी छ&त ीसगढ़ रा2य िव!ुत बोड ( सीटीयू के34 ीय पारेषण कंपनी डी/सी डबल स6कट डीवीसी दामोदर वैली कॉप=रेशन ईए 2003 िव!ुत अिधिनयम, 2003 ईएचवी अित(cid:10)र(cid:25)त उ>च वो(cid:18)ट ेज ईपीएस इलेि(cid:25)(cid:26)क पावर सव@ ईआर पूव=&त र 8े9 ईआरसी िव!ुत िनयामक आयोग एफएसीटीएस Bलेि(cid:25)सबल एसी (cid:26)ांसिमशन िस,ट म जीईटीसीओ गुजरात एनजC (cid:26)ांसिमशन कॉप=रेशन जीआईएस गैस इंसुलेटेड ि,वचिगयर जीओआई भारत सरकार जीवीए गीगा वो(cid:18)ट एDप ीयर जीड(cid:4)(cid:18) य ू गीगा वाट¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 481 जीड(cid:4)(cid:18) य ूई गीगा वाट इलेि(cid:25)(cid:26)कल एचईपी हाइEो इलेि(cid:25)(cid:26)क .ोजे(cid:25)ट एचवीडीसी हाई वो(cid:18)ट ेज डायरे(cid:25)ट कर(cid:19)ट आईसीटी इंटरकनेG(cid:25)टग (cid:26)ांसफाम(र आईएसजीएस इंटर ,ट ेट जनरेHटग ,ट ेशन (एस) आईएसटीएस इंटर ,ट ेट (cid:26)ांसिमशन िस,ट म इं(cid:26)ा - एसटीएस इं(cid:26)ा-,ट ेट (cid:26)ांसिमशन िस,ट म जेवी संयु(cid:25)त उ!म केपीटीसीएल कना(टक पावर (cid:26)ांसिमशन कॉप=रेशन केयूएमपीपी कृJण ानापKनम यूएमपीपी केवी 7कलो वो(cid:18)ट एलआईएलओ लाइन इन लाइन आउट एलएनजी तरल .ाकृितक गैस एलटी लो ट(cid:19)शन एलटीओए लLग टम( ओपन ऐ(cid:25)स ेस एमएपीपी म4ास एपीपी एमओपी िव!ुत मं9ालय एमवीए मेगा वो(cid:18)ट एDप ीयर एमवीएआर मेगा वो(cid:18)ट एDप ीयर (cid:10)रएि(cid:25)टव एमड(cid:4)(cid:18) य ू मेगा वाट एनईए नेपाल िव!ुत .ािधकरण नीपको नाथ( ई,ट न( इलेि(cid:25)(cid:26)क पावर कॉप=रेशन एनईपी राJ(cid:26) ीय िव!ुत योजना एनईआर पूवा(&त र 8े9 एनएचपीसी नेशनल हाइEो पावर कॉप=रेशन एनएलसी नेवेली िलPन ाइट कॉप=रेशन एलएलसीपीआर नॉन लै*स ेबल स(cid:19)(cid:26)ल पूल (cid:10)रसोस( एनपीसी 3य िू (cid:25)लयर पावर कॉप=रेशन एनपीसीआईएल 3य िू (cid:25)लयर पावर कॉप=रेशन ऑफ इंिडया िल. एनआर उ&त री 8े9 एनआरएलडीजी उ&त री 8े9 लोड िड,प ैच स(cid:19)टर एनआरपीसी उ&त री 8े9 िव!ुत सिमित एनटीपीसी नेशनल पावर कॉप=रेशन482 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ओएनजीसी तेल एवं .ाकृितक गैस िनगम ओपी. .चािलत पीएफबीआर प(cid:18)व राइ2ड Bयूल RीGडग (cid:10)रए(cid:25)ट र पीएफसी पावर फाइन(cid:19)स कॉप=रेशन पीजी पावर िSड पावरिSड/पीजीसीआईएल पावर िSड कॉप=रेशन ऑफ इंिडया िलिमटेड पीएलसीसी पावर लाइन कै(cid:10)रयर कDय ूिनकेशन पीएलएफ *ल ांट लोड फै(cid:25)ट र पीएमजीवाई .धानमं9ी Sामीण योजना पीपीए िव!ुत खरीद करार पीएसएस पावर िस,ट म ,ट ेबलाइजर पीएमयू फेसर मेजरम(cid:19)ट यूिनट पीएसयू साव(जिनक 8े9 उप)म पीटीसीयूएल पावर (cid:26)ांसिमशन कॉप=रेशन ऑफ उ&त राचं ल िल. (cid:25)व ैड (cid:25)व ाEप(cid:18) ड बंडल कंड(cid:25)ट र आर एUड एम नवीनीकरण और आधुिनकVकरण आरएपीपी राज,थ ान एपीपी आरई Sामीण िव!ुतीकरण आरपीसी 8े9ीय िव!ुत सिमित आरएल Wट ल(cid:19)थ आरएलडीसी (cid:10)रजनल लोड िड,प ैच स(cid:19)टर आरओड(cid:4)(cid:18) य ू राइट ऑफ वे आरपीसी 8े9ीय िव!ुत सिमितयां एस/सी Gसगल स6कट एस/सी ऑन डी/सी डबल स6कट टावर पर Gसगल स6कट एस/एस, एस/एस सब-,ट ेशन, सब-,ट ेशन एससी सीरीज कंपे3श ेसन एसईबी रा2य िव!तु बोड ( एसईआरसी रा2य िव!तु िनयामक आयोग एसएलडीसी ,ट ेट लोड िड,प ैच एसआर दि8णी 8े9 एसआरएलडीसी दि8णी 8े9 लोड िड,प ैच स(cid:19)टर एसआरपीसी दि8णी िव!ुत सिमित¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 483 ,ट ेटकॉम ,ट े(cid:10)टक कंपे3श ेसन एसटीजी 2nd सीकेटी G,(cid:26)Gगग ऑफ सेकंड स6कट एसटीओए शॉट( टम( ओपन ऐ(cid:25)स ेस एसटीयू रा2य पारेषण कंपनी एवीसी ,ट े(cid:10)टक वीएआर कंपे3श ेसन टीएपीपी तारापुर एपीपी टीसीकेएम थाउज(cid:19)ड स6कट 7कलोमीटर टीसीएससी थाइ(cid:10)र,ट र कं(cid:26)ो(cid:18)ड सीरीज कंपे3श ेसन टीएम िXवन मूस टीपीएस थम(ल पावर ,ट ेशन टीएसईसीएल ि9पुरा ,ट ेट इलेि(cid:25)(cid:26)क कॉप=रेशन िल. यूसीपीटीटी यूनीफाइड कॉमन पूल (cid:26)ांसिमशन टै(cid:10)रफ पएचवीडीसी अ(cid:18)(cid:26) ा एचवीडीसी यूआई अ3श ेYू(cid:18)ड इंटरच(cid:19)ज यूएलडीसी यूनीफाइड लोड िड,प ैच स(cid:19)टर यूएमपीपी अ(cid:18)(cid:26) ा मेगा पावर .ोजे(cid:25)ट यूपीसीएल उ&त रांखंड पावर कॉप=रेशन िल. यूपीपीसीएल उ&त र .दशे पावर कॉप=रेशन िल. वीएआर वो(cid:18)ट एDप ीयर (cid:10)रएि(cid:25)टव वीएलजीओ वेरी लाज( िSड ऑपरेटर ड(cid:4)(cid:18) य ूआर पिZमी 8े9 ड(cid:4)(cid:18) य ूआरएलडीसी पिZमी 8े9 लोड िड, पैच स(cid:19)टर ड(cid:4)(cid:18) य ूआरपीसी पिZमी 8े9 िव!ुत सिमित484 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] अअअअ(cid:2)(cid:2)(cid:2)(cid:2)यय यय ाााायययय ---- 1111 (cid:6)(cid:6)(cid:6)(cid:6)(cid:7)(cid:7)(cid:7)(cid:7)तत तत ााााववववननननाााा 1111....1111 रररराााा(cid:16)(cid:16)(cid:16)(cid:16)(cid:17)(cid:17) (cid:17)(cid:17) ीीीीयययय ििििवववव(cid:20)(cid:20)(cid:20)(cid:20)ततुुततुु ययययोोोोजजजजननननाााा िव!ुत अिधिनयम, 2003 कV धारा 3 के अनुसार क(cid:19)4ीय िव!ुत .ािधकरण (सीईए) को राJ(cid:26) ीय िव!ुत नीित के अनुसरण म(cid:19) राJ(cid:26) ीय िव!ुत योजना तैयार करने तथा पांच वष( म(cid:19) एक बार ऐसी योजना अिधसूिचत करने कV िजDम दे ारी स\पी गई ह।ै अिधिनयम म(cid:19) यह .ावधान 7कया गया ह ै 7क लाइस(cid:19)स- धारक^, िव!तु उ&प ादन कंपिनय^ एवं आम जनता से सझु ाव एवं आपि`यां आमंि9त करते aए राJ(cid:26) ीय िव!ुत योजना का मसौदा .कािशत करना होगा तथा राJ(cid:26) ीय िव!ुत योजना अिधसूिचत करने से पूव ( सीईए को क(cid:19)4 सरकार का अनुमोदन .ा*त करना होगा। सीईए ने मसौदा एनईपी तयै ार 7कया तथा 29 माच(, 2012 को अपनी वेबसाइट के माcय म से सभी पणधारक^ को इस े उपल(cid:4)ध कराया। (cid:10)ट*प िणयां .ा*त करने कV अंितम ितिथ 30 जनू , 2012 िनधा(cid:10)( रत कV गई। जारी कV गई ‘राJ(cid:26) ीय िव!ुत नीित (भाग-II) - पारेषण’ नामक इस योजना म(cid:19) 12वd योजना अव िध (अथा(त् 2012-13 से 2016-17) के िलए पारेषण योजना एवं 12वd योजना के बाद के िलए संभािवत योजना शािमल ह g । इसके अ!तनीकृत Wप म(cid:19) मसौदा द,त ावेज पर िविभ3 न पणधारक^ से .ा*त (cid:10)ट*प िणय^/सुझाव^ को cय ान म(cid:19) रखा ह।ै 1111....2222 रररराााा(cid:16)(cid:16)(cid:16)(cid:16)(cid:17)(cid:17) (cid:17)(cid:17) ीीीीयययय ििििवववव(cid:20)(cid:20)(cid:20)(cid:20)ततुुततुु ययययोोोोजजजजननननाााा ---- पपपपााााररररेेेेषषषषणणणण पारेषण आयोजना पारेषण .णाली कV अित(cid:10)र(cid:25)त 8मता अिभवृिh/िव,त ार, उनके समय एवं आवiय कता कV पहचान कV सतत .7)या होती ह।ै पारेषण कV आवiय कताए ं .णाली म(cid:19) नई उ&प ादन अिभवृिh, मांग म(cid:19) वृिh तथा .णाली के सामा3य सुदढ़ृ ीकरण, जो 7कसी िविशJट उ&प ादन प(cid:10)रयोजना से अिनवाय ( Wप स े जुड़ी नहd होती ह,ै से उ&प 3न हो सकती ह।g पारेषण आयोजना कV .7)या के माcय म से पारेषण अिभवृिh कV इन आवiय कताk कV पहचान कV जाती ह,ै अcय यन 7कया जाता ह ै तथा पुिl कV जाती ह।ै 1111....3333 भभभभााााररररतततत मममम (cid:27)(cid:27) (cid:27)(cid:27)पपपपााााररररेेेेषषषषणणणण (cid:30)(cid:30)(cid:30)(cid:30)णणणणििििललललययययाााा ंं ंं दशे म(cid:19) जो पारेषण .णािलयां ,थ ािपत ह g उनम (cid:19) अंतरा2( य ीय पारेषण .णािलयां (आईएसटीएस) तथा अंत:रा2य ीय पारेषण .णािलयां (इं(cid:26)ा-एसटीएस) शािमल ह।g 1111....3333....1111 अअअअततंंततंं रररराााा""!!""!! यय यय ीीीीयययय पपपपााााररररेेेेषषषषणणणण (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी ((((आआआआईईईईएएएएससससटटटटीीीीएएएएसससस)))) आईएसटीएस का ,व ािम&व एवं .चालन मुmय Wप से पावर िSड कॉप=रेशन आफ इंिडया िलिमटेड (पावरिSड) के पास ह ै जो क(cid:19)4ीय पारेषण कंपनी (सीटीयू) भी ह।ै भिवJय म (cid:19) .ित,प धC बोली के माcय म स े अंतरा(2य ीय पारेषण .णाली (आईएसटीएस) ,क Vम^ का िनमा(ण 7कया जाएगा तथा िनजी 8े9 कV अनेक सं,थ ाए ं इन आईएसटीएस घटक^ का ,व ािम&व तथा उनका .चालन कर(cid:19)गी। िनजी 89े के ,व ािम&व वाली या िनजी 8े9 एवं पावरिSड के बीच संयु(cid:25)त उ!म (जेवी) के Wप म(cid:19) अनेक आईएसटीएस योजनाए ं पहल े से ही िनमा(णाधीन ह।g आईएसटीएस िनDन िलिखत .योजन को पूरा करती ह:g (i) ऐसे अंतरा(2य ीय उ&प ादन क(cid:19)4^ से िव!ुत का (cid:10)र(cid:25)त ीकरण (िनJ) मण) िजनके लाभाथC एक स े अिधक रा2य ^ म(cid:19) ह।g (ii) अंतरा(2य ीय उ&प ादन क(cid:19)4^ स े िव!ुत कV .दायगी के िलए रा2य िSड के .दायगी Gबद ु तक िव!तु का पारेषण। (iii) अितरेक वाले रा2य (रा2य ^) से कमी वाले रा2य (रा2य ^) को या अितरेक वाले 8े9 (8े9^) स े कमी वाले 8े9 (8े9^) को .चालना&म क अितरेक का अंतरण। 1111....3333....2222 अअअअततंंततंं ::::रररराााा""""यय यय ीीीीयययय पपपपााााररररेेेेषषषषणणणण (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी ((((इइइइंंंं(cid:17)(cid:17)(cid:17)(cid:17)ाााा----एएएएससससटटटटीीीीएएएएसससस)))) रा2य के अंदर अंत:रा2य ीय पारेषण .णाली का ,व ािम&व एवं .चालन मुmय Wप से .&य ेक रा2य कV पारेषण कंपनी के हाथ^ म(cid:19) होता ह।ै इं(cid:26)ा-एसटीएस िनDन िलिखत .योजन पूरा करत े ह:g (i) ऐसे उ&प ादन क(cid:19)4^ से िव!ुत का (cid:10)र(cid:25)त ीकरण िजनम(cid:19) उस रा2य के लाभाथC होते ह।g¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 485 (ii) रा2य के अंदर आईएसटीएस कV सीमा स े रा2य िSड नेटवक( के िविभ3न उप क(cid:19)4^ तक पारेषण। (iii) रा2य के अंदर लोड क(cid:19)4^ को िव!ुत कV .दायगी के िलए रा2य िSड के अंदर पारेषण। 1111....4444 ‘‘‘‘रररराााा(cid:16)(cid:16)(cid:16)(cid:16)(cid:17)(cid:17) (cid:17)(cid:17) ीीीीयययय ििििवववव(cid:20)(cid:20)(cid:20)(cid:20)ततुुततुु ननननीीीीिििितततत’’’’ ककककेेेे (cid:30)(cid:30)(cid:30)(cid:30)ााााववववधधधधाााानननन राJ(cid:26) ीय िव!ुत नीित के पारेषण संबंधी कुछ .ावधान, िजनकV राJ(cid:26) ीय िव!तु योजना के संबंध म (cid:19) कुछ िवव8ाए/ं बाcय ताए ं ह,g इस .कार ह:g (i) दशे के िलए मजबूत एवं एकVकृत िव!तु .णाली िवकिसत करने के िलए पया(*त एवं समय पर िनवेश तथा द8 एवं समि3वत कार(वाई भी। (ii) उ&प ादन म(cid:19) योजनागत भारी वृिh को cय ान म(cid:19) रखते aए तथा िव!तु बाजार के िवकास के िलए भी पारेषण कV द8ता बढ़ाना। (iii) उ&प ादन कV नई 8मताk कV योजना बनाते समय ही संबh पारेषण 8मता आवiय कता कV भी गणना करनी होगी ता7क उ&प ादन 8मता एवं पारेषण सुिवधाk के बीच असंतुलन से बचा जा सके। उपयु((cid:25)त उoiे य ^ को पूरा करने के िलए इस नीित के अंतग(त िनDन िलिखत पर बल 7दया गया ह:ै (cid:1) क(cid:19)4 सरकार िव!ुत कV पया(*त अंतरा2( य ीय अवसरं चना उपल(cid:4)ध करान े तथा यह सिु निZत करने के िलए राJ(cid:26) ीय िSड के सतत िवकास म(cid:19) सहायता .दान करेगी 7क िव!ुत उ&प ादन के िलए अ(cid:18)प .यु(cid:25)त उ&प ादन 8मता कV सहायता कV जाए ता7क अितरेक वाले 8े9^ स े इसका पारेषण कमी वाले 8े9^ म(cid:19) हो सके। (cid:1) अिधिनयम म(cid:19) .ावधान के अनुसार सभी संबंिधत एज(cid:19)िसय^ से सम3व य ,थ ािपत करके राJ(cid:26) ीय िव!ुत योजना के आधार पर नेटवक( आयोजना एवं िवकास कV .मुख िजDम ेदारी क(cid:19)4ीय पारेषण कंपनी (सीटीयू) एवं रा2य पारेषण कंपनी (एसटीयू) कV ह।ै सीटीयू राJ(cid:26) ीय एवं 8े9ीय पारेषण .णाली कV आयोजना एवं िवकास के िलए िजDम ेदार ह।ै एसटीयू अंतरा(2य ीय पारेषण .णाली कV आयोजना एवं िवकास के िलए िजDम ेदार ह।ै पारेषण स े जुड़ी बाधाk को सबसे .भावी ढंग से दरू करन े के सामूिहक लqय कV .ािr के िलए सीटीय ू को एसटीयू के साथ सम3व य ,थ ािपत करन े कV जWरत होगी। (cid:1) पारेषण कV ऐसी अनुमािनत आवiय कताk को cय ान म(cid:19) रखकर नेटवक( िव,त ार कV योजना बनानी चािहए तथा काया(ि3वत करना चािहए जो खुली पaचं कV sय व,थ ा म(cid:19) .णाली स े आनुषंिगक ह^गी। लाभाtथय^ के साथ पूव( करार नेटवक( िव,त ार के िलए पूव( शत( नहd होगी। पणधारक^ से परामश( करके आवiय कताk कV पहचान करने के बाद सीटीयू/एसटीयू को नेटवक( िव,त ार का काय( करना चािहए तथा यथोिचत िविनयामक अनुमोदन के बाद िनJप ादन शुW करना चािहए। (cid:1) सीटीयू एवं एसटीयू uारा सगु (cid:10)ठत सूचना .सार एवं .कटन काय(िविधयां िवकिसत कV जानी चािहए ता7क सुिनिZत हो 7क सभी िहतधारक उ&प ादन एवं पारेषण कV प(cid:10)रयोजनाk एवं योजनाk कV ि,थित से अवगत ह।g ये समS आयोजना .7)या के अंग होने चािहए। (iv) उ&प ादन कंपिनय^, जो अब दशे भर म(cid:19) िविभ3न िवतरण लाइस(cid:19)स धारक^ को िब)V कर सकती हg, म (cid:19) .ित,प धा ( को बढ़ावा दने े के िलए पारेषण म (cid:19) खलु ी पaचं कV sय व,थ ा शWु कV गई ह।ै इसस े स,त ी िबजली कV उपल(cid:4)ध ता का माग( .श,त होना चािहए। अिधिनयम पारेषण म (cid:19) भेदभाव रिहत खुली पaचं का अिधदशे दते ा ह।ै जब थोक Sाहक^ को .ित,प धC उ&पादक^ से सीधे खरीदने म(cid:19) समथ ( बनाने के िलए संबंिधत रा2य आयोग^ uारा िवतरण नटे वक( तक खुली पaचं कV sय व,थ ा शुW होगी, तो बाजार म (cid:19) .ित,प धा( स े स,त ी एवं िवiव सनीय िबजली कV उपल(cid:4)ध ता बढ़ेगी। िविनयामक आयोग^ uारा भेदभाव रिहत खुली पaचं के िलए सुसाcय कारी Wपरेखा .दान 7कए जाने कV जWरत ह।ै इसके िलए वा,त िवक समय के आधार अधुनातन संचार एवं डाटा अिधSहण 8मता स े यु(cid:25)त लोड .ेषण सुिवधाk कV जWरत होती ह।ै य!िप इस समय 8े9ीय लोड .ेषण क(cid:19)4^ पर यह ि,थित ह,ै उपयु(cid:25)त रा2य आयोग^ को सुिनिZत करना चािहए 7क .ौ!ोिगकV उ3न यन के साथ486 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] मैGचग सुिवधाए ं आवiय कतानुसार रा2य ,त र पर उपल(cid:4)ध हg, तथा अिधक से अिधक जून, 2006 तक साकार कV गई ह।g (v) िव!ुत 8े9 के sय वि,थत िवकास एवं .गित म(cid:19) सहायता .दान करने तथा िSड के सुरि8त एव ं िवiव सनीय .चालन के िलए भी, पारेषण .णाली म(cid:19) पया(*त माtजन का सृजन करना चािहए। अंतरा(J(cid:26) ीय मानक^ एवं .थाk को cय ान म(cid:19) रखकर .चुरता ,त र तथा माtजन दोन^ कV s यव,थ ा के िलए पारेषण 8मता कV योजना बनाई जाएगी तथा िनमा(ण 7कया जाएगा। सुिनयोिजत एव ं मजबूत पारेषण .णाली न केवल पारेषण 8मताk के इJट तम उपयोग का सुिनiच य करेगी अिपतु उ&प ादन सुिवधाk के भी इJट तम उपयोग का सुिनiच य करेगी तथा िव!ुत कV 7कफायती .दायगी के अंितम उoiे य को .ा*त करने म (cid:19) सुिवधा .दान करेगी। पूरे 8े9 म(cid:19) िव!तु के 7कफायती पारेषण म (cid:19) सुिवधा .दान करने के िलए, सीईआरसी uारा एक राJ(cid:26) ीय पारेषण टै(cid:10)रफ Wपरेखा काया(ि3वत 7कए जाने कV जWरत ह।ै टै(cid:10)रफ तं9 दरू ी एवं 7दशा के .ित संवेदनशील होगा तथा .वाह कV मा9ा स े संबंिधत होगा। अंतरा(2य ीय एवं अंत:रा2य ीय .णािलय^ म(cid:19) पारेषण मू(cid:18)य िनधा(रण Wपरेखा म (cid:19) यथासंभव एकWपता बनाए रखने कV जWरत ह।ै इसके अलावा, यह सुिनिZत 7कया जाना चािहए 7क नेटवक( कV वत(मान खािमय^ स े पारेषण 8ित कV पूtत के िलए अतक(संगत आवiय कताए ं न उ&प 3न ह^। (vi) िव!ुत अिधिनयम, 2003 के अिधदशे के अनुसार पारेषण म(cid:19) भेदभाव रिहत खुली पaंच .दान करन े के िलए आवiय क िविनयामक Wपरेखा उ&प ादन 8मता को ि,थत करने हते ु उपयु(cid:25)त ,थ ान का चयन करने एव ं उ&प ादन ससं ाधन के इJट तम उपयोग के िलए और प(cid:10)रणामत: आपूtत कV लागत घटाने के िलए िव!ुत म(cid:19) sय ापार को .ो&स ािहत करने के िलए आवiय क ह।ै (vii) पारेषण 8े9 म(cid:19) िनजी िनवेश को .ो&स ािहत करन े के िलए िवशेष तं9 सृिजत 7कए जाएगं े ता7क 2012 तक मांग को पूरी तरह पूरा करने के उoiे य को .ा*त करने के िलए पया(*त िनवेश 7कए जाए।ं 1111....5555 ‘‘‘‘टटटटैैैै((((ररररफफफफ ननननीीीीिििितततत’’’’ ककककेेेे (cid:30)(cid:30)(cid:30)(cid:30)ााााववववधधधधाााानननन टै(cid:10)रफ नीित के कुछ संबh .ावधान इस .कार ह g जो पारेषण टै(cid:10)रफ Wपरेखा के माcय म स े पारेषण .णािलय^ के िवकास म(cid:19) व,त ुिनJठ ता .दान करते हg: (cid:2) जहां तक पारेषण का संबंध ह,g टै(cid:10)रफ नीित िनDन िलिखत उoiे य ^ को .ा*त करना चाहती ह:ै 1. दशे म(cid:19) उ&प ादन एवं पारेषण प(cid:10)रसंपि`य^ के द8 उपयोग को बढ़ावा दने े के िलए पारेषण नेटवक( के इJट तम िवकास का सुिनiच य करना; 2. पारेषण 8े9 म(cid:19) अपेि8त िनवेश आकtषत करना और पया(*त .ितफल .दान करना। (cid:2) 7कसी मcयवतC रा2य के भभू ाग म(cid:19) िव!ुत पारेषण एवं रा2य के अंदर वाहन जो ऐसे अंतरा(2य ीय पारेषण के िलए आनषु ि ं गक ह,ै समेत सभी अंतरा(2य ीय पारेषण के िलए उपयु(cid:25)त पारेषण टै(cid:10)रफ Wपरेखा को पूरे दशे म(cid:19) सभी प(cid:10)रसंपि`य^ के कारगर उपयोग को बढ़ावा दने े तथा जWरत के अनुसार नई पारेषण 8मता के &व (cid:10)रत िवकास के िलए काया(ि3वत करने कV जWरत ह।ै 1111....6666 ससससीीीीईईईईआआआआररररससससीीीी ििििववववििििननननययययमममम,,,, मममम (cid:27)(cid:27) (cid:27)(cid:27)(cid:30)(cid:30)(cid:30)(cid:30)ााााववववधधधधाााानननन अिधिनयम के अनुसरण म(cid:19), क(cid:19)4ीय आयोग ने िविनयम जारी 7कया ह ै जो िवतरण लाइस(cid:19)स धारक^, उ&प ादक^, िव!ुत sय ापा(cid:10)रय^ एवं अनुमत ओपन अ(cid:25)स से Sाहक^ को अंतरा(2य ीय पारेषण .णाली तक पaचं .ा*त करने के िलए पा9 बनाते ह।g वत(मान िविनयम^ के अनुसार, अ(cid:18)प , मcय म या दीघ( अविध के आधार पर पारेषण .णाली तक पaचं .ा*त कV जा सकती ह।ै क(cid:19)4ीय पारेषण कंपनी (सीटीयू) मcय म अविध (3 माह स े 3 साल) और दीघ ( अविध (12 स े 25 साल) कV पaचं , िजसकV जWरत िविशJट Wप स े उ&प ादन क(cid:19)4 को या उसकV ओर स े 7कसी sय ापारी को होती ह,ै .दान करन े के िलए नोडल एज(cid:19)सी ह।ै दीघ ( अविध कV पaचं पारेषण आयोजना Wट के माcय म से .दान कV जानी होती ह।ै 8े9ीय लोड .ेषण क(cid:19)4 अ(cid:18)प अविध कV खुली पaचं (3 माह तक) .दान करन े वाली नोडल एज स(cid:19) ी ह।ै राJ(cid:26) ीय लोड .ेषण क(cid:19)4 िव!ुत ए(cid:25)स च(cid:19)ज तक पारेषण पaचं .दान करने के िलए नोडल एज(cid:19)सी ह।ै¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 487 अअअअ(cid:2)(cid:2)(cid:2)(cid:2)यय यय ाााायययय---- 2222 भभभभााााररररतततत मममम (cid:12)(cid:12) (cid:12)(cid:12) पपपपााााररररेेेेषषषषणणणण (cid:6)(cid:6)(cid:6)(cid:6)णणणणााााललललीीीी ककककाााा ििििववववककककाााासससस 2222....1111 भभभभााााररररतततत मममम (cid:27)(cid:27) (cid:27)(cid:27)पपपपााााररररेेेेषषषषणणणण (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी ककककाााा ििििववववककककाााासससस 2222....1111....1111 एएएएकककक....ककककृृृृतततत आआआआययययोोोोजजजजननननाााा हहहहततततेेेे ुु ुुरररराााा""""यय यय िििि1111डडडड,,,, ककककाााा ििििननननममममााााणण!!णण!! ,व ाधीनता के समय दशे म(cid:19) िव!ुत .णािलयां िनiच य ही शहरी एवं औ!ोिगक 8े9^ म(cid:19) या उनके आसपास िवकिसत .थक .णिलय^ के Wप म (cid:19) थी। दशे कV सं,थ ािपत उ&प ादन 8मता मा9 1300 मेगावाट के लगभग थी और इस िव!तु .णली म(cid:19) छोटी-छोटी उ&प ादन इकाइयाँ शािमल थd जो अरीय Wप से (रेिडयली) भार के34 ^ का पोषण करती थd। उ>च तम पारेषण वो(cid:18)ट ता 132 केवी थी। 50 एव ं 60 के दशक के दौरान रा2य -8े9 का नेटवक( 132 केवी के वो(cid:18)ट ता ,त र तक और 60 एवं 70 के दशक के दौरान 220 केवी तक पaचं गया । बाद म(cid:19), sय ापक पैमाने पर िव!ुत का बaत अिधक दरू ी तक पारेषण करने के उoiे य कई रा2य ^ (उ&त र .दशे , महाराJ(cid:26) , मcय .दशे , गुजरात, ओडीशा, आ3- .दशे और कना(टक) म(cid:19) रा2य 8े9 म(cid:19) सारभूत 400 केवी का नेटवक( भी िवक िसत aआ। अिधकांश रा2य ^ म(cid:19) रा2य िSड के िवकास के साथ ही 8े9ीय िSड के िलए भी आधार तैयार हो गया था। 2222....1111....2222 (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ीीीीयययय आआआआययययोोोोजजजजननननाााा कककक.... ससससककंंककंं 4444पप पप ननननाााा एएएएवववव ंं ंं(cid:30)(cid:30)(cid:30)(cid:30)ाााा5555तत तत ीीीीयययय िििि1111डडडड,,,, ककककाााा एएएएकककक....ककककररररणणणण---- तीसरी पंचवषCय योजना के दौरान िव!ुत 8े9 म(cid:19) 8े9ीय आयोजना कV संक(cid:18)प ना कV गयी। तदनुसार िव!तु िवकास आयोजना के उoiे य स े दशे को पाँच िव!ुत 89े ^- उ&त री, पिZमी, दि8णी, पूवC एवं उ&त र-पूवC म(cid:19) िचि3हत 7कया गया। 8े9 म(cid:19) .ा3त ीय तं9^ के एकVकृत सचं ालन कV sय व,थ ा और रा2य ^ के मcय िव!ुत के आदान- .दान को .ो&स ाहन दने े के िलए 1964 म(cid:19) दशे के .&य ेक 8े9 म(cid:19) 8े9ीय िव!ुत मंडल ,थ ािपत 7कये गये। रा2य ^ को इस .कार कV िव!ुत िविनमय के िलए अधो संरचना के िनमा(ण हते ु .ो&स ाहन दने े के िलए अंतरा(ज् यीय लाइन^ को ‘के34 uारा .ायोिजत’ माना गया और रा2य ^ को रा2य योजना के अलावा (cid:4)य ाज-मु(cid:25)त ऋण उपल(cid:4)ध कराया गया। इस काय()म के अंतगत( 55 अंतरा(2य ीय लाइन^ का िनमा(ण aआ िजनम(cid:19) से 13 लाइन^ न े िविभ3न 8े9^ म(cid:19) ि,थत रा2य ^ को जोड़ा िजससे अंत8@9ीय Gलक का आरिDभक सेट तैयार aआ। इन लाइन^ ने िविभ3न 8े9^ के मcय अरीय Wप से िव!तु के आदान-.दान कV सुिवधा .दान कV। 2222....1111....3333 (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ीीीीयययय िििि1111डडडड,,,, ककककाााा उउउउ7777वववव---- लगभग 1975 तक रा2य एवं के34 शािसत .दशे ^ म(cid:19) पारेषण का िवकास आवiय क Wप से रा2य के िव!तु मंडल^/ िव!ुत िवभाग^ uारा ही aआ । रा2य ^ के िव!तु उ&प ादन 8मता कV वृिh के .यास^ को बल दने े के िलये 1975 म(cid:19) के34 ीय 8े9 कV उ&प ादन िव!ुत कंपिनय^ यथा राJ(cid:26) ीय जल िव!ुत िव!ुत िनगम (एनएचपीसी) एवं राJ(cid:26) ीय ताप िव!तु िनगम (एनटीपीसी) आ7द बनायी गx। इन िनगम^ न े 8े9^ म(cid:19) रा2य ^ के िहताथ ( बड़ी उ&प ादन इकाइय^ कV ,थ ापना कV। इन िनगम^ न े रा2य ^ कV सीमाk से बाहर लाभाथC रा2य ^ को िव!ुत के िवतरण एवं िव!ुत के िनJ) मण हते ु सहयोगी पारेषण लाइन^ के िवकास कV िजDम ेदारी भी ली। इसने 8े9ीय िSड .णली के िनमा(ण को .ो&स ाहन प(cid:10)रणाम,व Wप 1980 के दशक के अंत तक कई सुदढ़ृ 8े9ीय नेटवक( अि,त&व म(cid:19) आये। 2222....1111....4444 अअअअततततंंंं (cid:7)(cid:7)(cid:7)(cid:7)33883388 ीीीीयययय 9999लललल::::सससस ककककाााा ििििववववककककाााासससस 1989 म(cid:19) के34 ीय उ&प ादन कंपिनय^ कV पारेषण शाखाk को भारतीय िव!तु िSड िनगम (पावरिSड) के िनमा(ण हते ु बाँट 7दया गया ता7क सीईए uारा तैयार Wपयोजना के आधार पर के34 ीय उ&प ादन इकाइय^ एव ं अंत8@9ीय पारेषण काय()म से जुड़ े पारेषण .णली के काया(3व यन को गित .दान कV जा सके। तब तक दशे म (cid:19) उ&प ादन एवं पारेषण .णली का आयोजना एवं िवकास 8े9ीय आ&म िनभ(रता के आधार पर होता था तथा रा2य िव!ुत कंपिनया ँ अंत8@9ीय आधारभतू संरचना को बनाने के िलए अंत8@9ीय Gलक का .ारिDभक सेट के34 uारा .ायोिजत काय()म के अंतग(त तैयार 7कया गया। िजसका उपयोग िविभ3न 8े9^ म(cid:19) सीिमत ढ़ंग स े प(cid:10)रचालन आिध(cid:25)य के िविनमय को सुिवधाजनक बनाने म(cid:19) 7कया गया (cid:25)य ^7क 8े9ीय िSड , व.णली Wप स े संचािलत होते थे उनकV िभ3न -िभ3न प(cid:10)रचालन आवृि`याँ थी और इन अतं 8@9ीय Gलक^ पर िव!ुत िविनमय िसफ( अरीय ढ़ंग से ही हो सकता था ।488 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 2222....2222.... रररराााा(cid:16)(cid:16)(cid:16)(cid:16)(cid:17)(cid:17) (cid:17)(cid:17) ीीीीयययय िििि1111डडडड ककककाााा ििििववववककककाााासससस---- राJ(cid:26) ीय िSड म(cid:19) उ&प ादन के34 ^, अंत8@9ीय Gलक^, अंतर- रा2य ीय पारेषण .णाली एवं एसटीयूस के अंतररा2य ीय पारेषण से िव!ुत के िनJ) मण हते ु पारेषण .णाली सिDमिलत ह।g इस .कार राJ(cid:26) ीय िSड का िवकास एक िवकासा&म क .7)या ह।ै यही आशा कV जा रही ह ै 7क 12वd योजना के अंत तक दशे का .&य के .ांत अपने पड़ोसी रा2य ^ या संलPन रा2य (रा2य ^) से कम से कम दो उ>च 8मता त(cid:18)ु य कािलक 400 केवी या 765 केवी लाइन एव ं एक एचवीडीसी िu-ुवीय/सुलभ सपं क( (बेक टु बेक Gलक) स े जड़ु जायेगा। यह और बड़ा तु(cid:18)य कािलक पारेषण जाल बना दगे ा जहाँ सभी 8े9ीय एवं रा2य ीय िSड (cid:19) आपस म(cid:19) िव!ुत के मामले म(cid:19) जुड़ी ह^गी एवं एक ही आवृि` पर संचािलत ह^गd। राJ(cid:26) ीय िSड का िवकास िनDन ानसु ार aआ ह-ै एचवीडीसी िu-ुवीय तलचरे -कोलार म(cid:19) वृिh, गजुवाक म(cid:19) दि8णी 8े9 और पूवC 8े9 के बीच एचवीडीसी सुलभ संपक( .णाली का िuत 2222....2222....1111 (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ीीीीयययय िििि1111डडडड,,,, ककककेेेे मममम;;;;यय यय अअअअतततत44ुु44ुु यय यय ककककााााििििललललकककक अअअअ5555तत तत ससससबब<<बब<< धधंंधधंं नननन िविभ3न 8े9ीय िSड^ कV .चालन sय व,थ ा को cय ान म(cid:19) रखते aये 1990 के दशक के आसपास यह िनण(य िलया गया 7क िव!ुत कV भारी िनयंि9त मा9ा का आदान-.दान करन े म(cid:19) स8म बनाने के िलए .ारंिDभक ,त र पर 8े9ीय िSड^ के बीच अतु(cid:18) यकािलक संबंधन ,थ ािपत 7कये जाय(cid:19)। तदनुसार, Gवcय ाचल म(cid:19) पिZमी 8े9 एवं उ&त री 8े9 के बीच एक 500 मेगावाट का अतु(cid:18)य कािलक एचवीडीसी सुलभ संपक( (बेक टु बेक Gलक) ,थ ािपत कV गयी। बाद म(cid:19), पिZमी 8े9 एवं दि8णी 8े9 (1000 मेगावाट 8मता, भ4ावती म(cid:19)) के बीच तथा पूवC 8े9 एवं दि8णी 8े9 (500 मेगावाट 8मता, गजुवाका म(cid:19)) के बीच तथा पूवC8े9 एवं उ&त री 8े9 (500 मेगावाट 8मता, सासाराम) के बीच ,थ ािपत कV गयी। पूवC 8े9 एवं दि8णी 8े9 के बीच गजुवाका Gलक कV 8मता 1000 मेगावाट तक बढ़ा दी गयी। 2222....2222....2222 (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ीीीीयययय िििि1111डडडड,,,, ककककाााा तततत44ुु44ुु यय यय ककककााााललललनननन ((((9999सससस>>>>ोोोोननननााााइइइइजजजजशशेेशशेे नननन)))) 1992 म(cid:19) उ&त री 8े9 एवं उ&त रपूवC 8े9^ को बीरपाड़ा- सालाकटी 220 केवी दोहरी प(cid:10)रपथ पारेषण लाइन के uारा एक साथ तु(cid:18)य कािलक अनतसzबंिधत 7कया गया और 7फर 440 केवी डी/सी ब^गाइगाँव-मा(cid:18)द ा लाइन से। 2003 म (cid:19) 400 केवी राउरकेला- रायपुर डी/सी लाइन के uारा पिZमी 8े9 को पूवC 8े9- उ&त रपूवC 8े9ीय .णाली से तु(cid:18)य कािलक Wप से आपस म(cid:19) जोड़ा गया । इस .कार पूव( 8े9- उ&त रपूव( 89े , पिZम 8े9 वाले मcय भारत .णाली ने काय( करना .ारDभ 7कया। वष( 2006 म(cid:19) मुजBफरपुर- गोरखपुर 400 केवी डी/सी लाइन जड़ु जाने स े उ&त री 8े9 भी इस .णाली से जुड़ गया। इस .कार उपरी भारत .णली िजसम(cid:19) उ&त र 8े9- पूव( 8े9- उ&त र पूव( 8े9 .णाली सिDमिलत ह,ै का िवकास aआ। वष( 2007 म(cid:19) आगरा-Pव ािलयर 765 केवी एस/सी लाइन-1 िजसे 400 केवी ,त र पर चलाया जाता ह,ै के माcय म से उ&त र 8े9 भी पिZमी 8े9 से तु(cid:18)य कािलक Wप से जुड़ गया। 2222....2222....3333 अअअअििििखखखखलललल भभभभााााररररततततीीीीयययय एएएएकककक....ककककृृृृतततत रररराााा(cid:16)(cid:16)(cid:16)(cid:16)(cid:17)(cid:17) (cid:17)(cid:17) ीीीीयययय िििि1111डडडड कककक.... ययययोोोोजजजजननननाााा एएएएवववव ंं ंंउउउउ7777वववव वत(cid:3)मान सदी के आगमन के साथ ही देश म(cid:18) उ(cid:20) पादन एवे पारेषण क(cid:26) योजना का (cid:30) यान जो (cid:31)े ीय आ(cid:20) मिनभ(cid:3)रता क(cid:26) ओर था अिखल भारतीय ' तर पर उपल(ध संसाधन+ के अिधकतम उपयोग क(cid:26) ओर मुड़ गया ह।ै सीईए 1ारा 2कये गये उ(cid:20)प ादन योजना अ(cid:30) ययन ने यह इंिगत 2कया ह ै 2क अिखल भारतीय ' तर पर योिजत अित4र5त (cid:31)मता (cid:31)े ीय ' तर पर योिजत (cid:31)मता से कम ह।ै 2फर, एक मजबूत अिखल भारतीय एक(cid:26)कृत रा: ;ीय ि<ड देश म(cid:18) असमांग ढ़ंग से िवत4रत उ(cid:20) पादन संसाधन के ? यवि'थत @योग को सुिनिAत करता ह।ै रा: ;ीय ि<ड के िवकास क(cid:26) आवB यकता को पहचानते Dए, चरणबE तरीके से अF तर-(cid:31)े ीय Gलक क(cid:26) (cid:31)मता को बढ़ाने पर जोर 2दया गया। 9वH योजना के अF त तक कुल अF तर (cid:31)े ीय पारेषण (cid:31)मता 5756 मेगावाट थी। 10वH योजना अथा(cid:3)त् 2002-07 के दौरान कुल 8300 मेगावाट क(cid:26) अFत र (cid:31)े ीय (cid:31)मता वृिE क(cid:26) गयी। इस @यास म(cid:18), मुK य उपलि(धयाँ थH- तालचेर-कोलार ि1Mुवीय एचवीडीसी म(cid:18) वृिE, गजुवाका म(cid:18) दि(cid:31)ण (cid:31)े एवं पूव(cid:3) (cid:31)े के बीच एचवीडीसी सुलभ संपक(cid:3) @णाली के ि1तीय @ितNपक, सासाराम म(cid:18) उ(cid:20) तर (cid:31)े एवं पूव(cid:3) (cid:31)े के बीच¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 489 एचवीडीसी सुलभ संपक(cid:3) @णाली, राउरकेला- रायपुर 400 केवी डी/सी लाइन 1ारा उ(cid:20) तरपूव(cid:3)/पूव(cid:3) (cid:31)े ि<ड का पिAम (cid:31)े ि<ड के साथ तुO यकािलक अंतसPबंध, मुजQफरपुर- गोरखपुर 400 केवी डी/सी (5 वैड) लाइन 1ारा और बाद म(cid:18) एक प4रपथ पटना- बिलया 400 केवी डी/सी (5 वैड) लाइन एवं आगरा- S वािलयर 765 केवी पारेषण लाइन (400 केवी पर संचािलत) उ(cid:20)त र पूव(cid:3) (cid:31)े /पूव(cid:3) (cid:31)े /पिAम (cid:31)े ि<ड का उ(cid:20) तर ि<ड के साथ तुO यकािलक अंतसPबंध। 10वH योजना के अंत तक कुल अंतर(cid:31)े ीय पारेषण (cid:31)मता 14050 मेगावाट थी जो 11वH योजना (माच(cid:3), 2012) तक बढ़कर 27750 मेगावाट हो गयी। 11वH योजनाविध म(cid:18) लागू 2कये जाने वाली अंतर(cid:31)े ीय Gलक+ का िववरण अ(cid:30) याय 6 म(cid:18) 2दया गया ह ै और जो 12वH योजनाविध हते ु िनमा(cid:3)णाधीन/ िनयोिजत ह ैउनका िववरण अ(cid:30) याय 7 म(cid:18) 2दया गया ह।ै 2222....3333 पपपपााााररररेेेेषषषषणणणण (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी ककककाााा भभभभौौौौििििततततकककक AAAAपपपप मममम (cid:27)(cid:27) (cid:27)(cid:27)ििििववववककककाााासससस भारत म(cid:19) पारेषण नेटवक( एवं प(cid:10)रणमन 8मता म(cid:19) लगातार वृिh aई ह।ै यह वृिh दशे म(cid:19) िव!ुत उ&प ादन एवं मांग म(cid:19) aई वृिh के अनWु प रही हाै 220 के.वी. एवं इससे अिधक वो(cid:18)ट ता ,त र के पारेषण लाइन^ म(cid:19) (प(cid:10)रपथ 7क.मी. के Wप म(cid:19)) िपछले 26 वष{ म(cid:19) लगभग पाँच गुना रहा ह ै एवं उपके34 ^ कV 8मता के िलए, इसी समय म(cid:19), आठ गुना से भी 2य ादा रहा ह।ै उ>च वो(cid:18)ट ता ,त र पर पारेषण .णाली म (cid:19) और उप-के34 8मताk म(cid:19) और अिधक वृिh aई ह।ै पारेषण म(cid:19) वृिh का यह पहलू, लDब ी दरू ी तक बड़ी मा9ा म(cid:19) िव!ुत के पारेषण कV आवiय कता साथ ही सही रा,त ा, |ास म(cid:19) कमी एवं िSड-िवiव सनीयता म(cid:19) सुधार कV जWरत को दशा(ता ह।ै 2222....3333....1111 पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन,,,, मममम (cid:27)(cid:27) (cid:27)(cid:27)ववववििृृििृृ BBBB –––– * [6वd पंचवषCय योजना के अंत (माच( 1985) से 11वd योजना (माच( 2012) तक] 220 के.वी. एवं इससे अिधक वो(cid:18)ट ता ,त र के पारेषण लाइन^ म(cid:19) कुल वृिh नीचे दशा(यी गई है- .&य ेक योजना के अ3त म(cid:19) पारेषण लाइन^ (सीकेएम) म(cid:19) विृ h ववववोोोो(cid:3)(cid:3)(cid:3)(cid:3)टट टट तततताााा (cid:8)(cid:8)(cid:8)(cid:8)तत तत रररर 6666वववव(cid:9)(cid:9)(cid:9)(cid:9) ययययोोोोजजजजननननाााा 7777वववव(cid:9)(cid:9)(cid:9)(cid:9) ययययोोोोजजजजननननाााा 8888वववव(cid:9)(cid:9)(cid:9)(cid:9) ययययोोोोजजजजननननाााा 9999वववव(cid:9)(cid:9)(cid:9)(cid:9) ययययोोोोजजजजननननाााा 11110000वववव(cid:9)(cid:9)(cid:9)(cid:9)ययययोोोोजजजजननननाााा 11111111वववव(cid:9)(cid:9)(cid:9)(cid:9) ययययोोोोजजजजननननाााा 777766665555 ककककेेेेववववीीीी 0 0 0 971 2184 5250 एएएएचचचचववववीीीीडडडडीीीीससससीीीी 0 0 1634 3138 5872 9432 बबबबााााइइइइपपपपोोोोलललल 444400000000 ककककेेेेववववीीीी 6029 19824 36142 49378 75722 106819 222222220000 ककककेेेेववववीीीी 46005 59631 79600 96993 114629 135980 ककककुुुुलललल ससससीीीीककककेेेेएएएएमममम 55552222000033334444 77779999444455555555 111111117777333377776666 111155550000444488880000 111199998888444400007777 222255557777444488881111 पारेषण लाइन2 म- व(cid:8)ृ 4 मएके ीस लकु (cid:1)(cid:1)(cid:1)(cid:1)(cid:1)(cid:1) 300000 250000 200000 150000 100000 50000 0 ६वीं योजना ७वीं योजना ८वीं योजना ९वीं योजना १०वीं योजना ११वीं योजना ययययोोोोजजजजननननाााा490 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 2222....3333....2222 उउउउपपपपककककेेेे5555CC CC ,,,, मममम (cid:27)(cid:27) (cid:27)(cid:27)ववववििृृििृृ BBBB :::: 6वd पंच वषCय योजना (अथा(त माच(, 1985) स े 11वd पंच वषCय योजना (अथा(त माच(, 2012) के अंत तक 220 के.वी एवं अिधक वो(cid:18)ट ेज ,त र के उपके34 ^ और एचवीडीसी टtमनल^ कV पारषण 8मता म(cid:19) संिचत वृिh नीच े दशा(यी गई ह ै : (cid:30)(cid:30)(cid:30)(cid:30)DDDDयय यय ककेेककेे ययययोोोोजजजजननननाााा ककककेेेे अअअअ5555तत तत मममम (cid:27)(cid:27) (cid:27)(cid:27)उउउउपपपपककककेेेे5555CC C C ,,,, मममम (cid:27)(cid:27) (cid:27)(cid:27)ववववििृृििृृ BBBB ((((एएएएममममववववीीीीएएएए////ममममववेेववेे ाााा)))) 6666ववववEEEE ययययोोोोजजजजननननाााा 7777ववववEEEE ययययोोोोजजजजननननाााा 8888ववववEEEE ययययोोोोजजजजननननाााा 9999ववववEEEE ययययोोोोजजजजननननाााा 11110000ववववEEEE ययययोोोोजजजजननननाााा 11111111ववववEEEE ययययोोोोजजजजननननाााा 777766665555 ककककेेेेववववीीीी 0 0 0 0 0 25000 एएएएचचचचववववीीीीडडडडीीीीससससीीीी 0 0 0 5000 8000 9750 बबबबााााइइइइपपपपोोोोलललल 444400000000 ककककेेेेववववीीीी 9330 21580 40865 60380 92942 151027 222222220000 ककककेेेेववववीीीी 37291 53742 84177 116363 156497 223774 ककककुुुुलललल एएएएममममववववीीीीएएएए//// 46621 75322 125042 181743 257439 409551 ममममेगेगेगेगााााववववााााटटटट उपक-ि2 क! ूगित 2222....4444 पपपपााााररररेेेेषषषषणणणण (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे मममम (cid:27)(cid:27) (cid:27)(cid:27)अअअअििििततततममममहहहहDDDDवववव पपपपणणूूणणूू !! !!घघघघटटटटननननााााएएएए ंं ंं ::::---- पारेषण नेटवक( का िवकास उ&प ादन 8मता कV वृिh को cय ान म(cid:19) रखते aए 7कया गया ह।ै पारेषण .णली म(cid:19) वृिh को पारेषण नेटवक( म(cid:19) भौितक वृिh के साथ-साथ उ>च वो(cid:18)ट ता पारेषण कV शुWआत एवं वृहत िव!तु पारेषण हते ु नवीन तकनीक कV शुWआत के Wप म(cid:19) समझा जा सकता ह।ै इस वृिh कV मुmय घटनाए ँ ह ै – 1948 – िव!ुत (आपूtत) अिधिनयम 1948 इस अिधिनयम ने के34 ीय िव!ुत .ािधकरण (सीईए) एवं रा2य िव!तु बोड ( कV ,थ ापना का .ावधान 7कया। 1950-60 – .ांतीय िSड^ का िवकास एवं 220 के.वी. वो(cid:18)ट ता ,त र कV शुWआत 1964 – 8े9ीय िव!ुत बोड{ का गठन 1965-73 – 8े9ीय िSड .णाली के िनमा(ण हते ु .ांतीय िSड^ को आपस म(cid:19) जोड़ना 1977 – 400 के.वी. वो(cid:18)ट ता ,त र कV शुWआत ावमे /एीवमए लकु (cid:1)(cid:1)(cid:1)(cid:1)(cid:1)(cid:1) 450000 400000 350000 300000 250000 200000 150000 100000 50000 0 ६वीं योजना ७वीं योजना ८वीं योजना ९वीं योजना १०वीं योजना ११वीं योजना ययययोोोोजजजजननननाााा¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 491 1980-88 – के34 ीय 8े9 उ&प ादन के साथ सहयोगी पारेषण .णली के Wप म(cid:19) 8े9ीय िSड़ तं9^ का िवकास। 1989 – एचवीडीसी सुलभ संपक( (बेक टु बेक Gलक)। 1990 – एचवीडीसी िh-ुवीय लाइन कV शुWआत। 1992 – पूव( 8े9 व उ&त र-पूव( 8े9 का तु(cid:18)य कािलक अंतरसंबंध । 1999 – अिखल भारतीय .णली कV ओर पारेषण आयोजना का पुन(उ3म ुखीकरण। 2000 – 765 केवी लाइन कV शु}आत (शु}आत म(cid:19) 400 केवी पर आवेिशत) 2003 – िव!ुत अिधिनयम, 2003 – सभी पाँच^ िव!ुत 8े9^ म(cid:19) वा,त िवक समय बंदोब,त के साथ एबीटी का काया(3व यन िजसस े िव!ुत बाजार के ऑपरेशन हते ु आधारभतू सरं चना का िनमा(ण aआ। – पिZम 8े9 का पूव( 8े9 - उ&त रपूव( 8े9 .णली के साथ तु(cid:18)य कािलक अंतसzबंध – बृहत् अंत89े ीय एचवीडीसी पारेषण .णली। 2004 – पारेषण म(cid:19) मु(cid:25)त पaचँ (तालयेर-कोलार एचवीडीसी Gलक)। 2006 – उ&त र 8े9 का पूव( 8े9- उ&त र पूव( 8े9 – पिZम .णली के साथ तु(cid:18)य कािलक अंतसzबंध। 2007 – िसयात उपके34 का 765 केवी सचं ालन। 2007 – 765 केवी पारेषण लाइन^ का 765 केवी पर संचालन । 2010 – आरएलडीसी/एनएलडीसी का सीटीओ से पृथक सं,थ ा के Wप काय( करन े हते ु – पॉ, को ((((PPPPOOOOSSSSOOOOCCCCOOOO)))) कV अिधसूचना। 2011 – पूरे दशे म(cid:19) पारेषण शु(cid:18)क ^ (चाजे़(ज़) एवं |ास को बाँटन े हते ु संबंध िब3द ु(*व ाइंट ऑफ कने(cid:25)श न) पर आधा(cid:10)रत िविध का काया3( व यन । ************************************492 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] अअअअ(cid:2)(cid:2)(cid:2)(cid:2)यय यय ाााायययय---- 3333 पपपपााााररररेेेेषषषषणणणण आआआआययययोोोोजजजजननननाााा ििििसससस(cid:19)(cid:19)(cid:19)(cid:19)ाााांतंतंतंत 3333....1111 पपपपााााररररेेेेषषषषणणणण आआआआययययोोोोजजजजननननाााा ििििससससBBBBााााततंंततंं भारत म(cid:19) पारेषण आयोजना िसhांत का .ादरु भाव िपछले कुछ दशक^ म(cid:19) िवकास कV गित को बल दने े और ऊजा ( 8े9 कV आवiय कताk को पूरा करने के िलए aआ ह।ै पारेषण आयोजना, िव!ुत अिधिनयम 2003, राJ(cid:26) ीय िव!ुत नीित, टै(cid:10)रफ नीित, िविनयम एवं िव!ुत 8े9 के बाजारो3म ुखीकरण आ7द से संबh ह।ै पारेषण आयोजना के उoiे य , पहल और मानदडं , िजनका .ादरु भाव समय के आधार पर aआ, म(cid:19) दीघ(कािलक आधार पर पारेषण 89े म(cid:19) िनवेश के इJट तमीकरण के समय लोड वृिh कV अिनिZतताk और उ&प ादन 8मता अिभवृिh को cय ान म(cid:19) रखा जाता ह ै । पया(*त ता, सरु 8ा और िवiव सनीयता के िलए िनधा((cid:10)रत लqय ^ को पूरा करने के उoiे य से पारेषण अिभवृिh आवiय कताk कV आयोजना तैयार करते समय उपयु((cid:25)त सभी लqय ^, पहल^ और मानदडं ^ को cय ान म(cid:19) रखा जाता ह।ै िविभ3न तकनीकV िवक(cid:18)प ^ और पारेषण आयोजना िसhांत पर िवचार करते aए .णाली अcय यन/िवiल ेषण के ज(cid:10)रए पारेषण आयोजना का सुदढ़ृ ीकरण 7कया जाता ह।ै 3333....2222 आआआआययययोोोोजजजजननननाााा ककककेेेे उउउउHHHHIIेेIIेे यय यय ---- भारत म (cid:19) इJट तम पारेषण .णाली कV आयोजना और िवकास करत े समय िनDन िलिखत उoiे य ^ को cय ान म(cid:19) रखा जाता ह:ै 1111---- ससससममममाााानननन ििििववववककककाााासससस---- भारत म(cid:19) पारेषण .णाली का िवकास समS Wप से इस .कार से 7कया जाये 7क सभी 8े9^ म(cid:19) िव!तु कV उपल(cid:4)ध ता समान Wप स े रह े भल े ही दशे म(cid:19) नवीकरणीय ऊजा ( (cid:129)ोत^ सिहत िव!ुत उ&प ादन संसाधन^ कV उपल(cid:4)ध ता असमान Wप से (cid:25)य ^ न मौजूद हो। 2222---- उउउउDDDDपप पप ााााददददनननन ससससससंंससंं ााााधधधधनननन,,,, ककककाााा इइइइ(cid:16)(cid:16)(cid:16)(cid:16)टट टट ततततमममम ददददोोोोहहहहनननन---- उिचत पारेषण .णाली के िवकास स े उ&प ादन संसाधन^ का समुिचत दोहन संभव ह।ै उसम(cid:19) जल-ताप िव!ुत *ल ांट^ का संयुPम न हो सकता ह।ै पूवC भारत म(cid:19) कोयला और उ&त र एवं पूव=&त र भारत म (cid:19) जल िव!ुत संसाधन^ को cय ान म(cid:19) रखते aय े उपल(cid:4)ध उ&प ादन संसाधन^ यथा जल-ताप िव!ुत *ल ांट^ के संयुPम न का इJट तम उपयोग करने के िलए उिचत पारेषण .णाली का िवकास करना आवiय क ह।ै 3333---- (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ीीीीयययय पपपपीीीीकककक ममममाााागगँँगगँँ मममम (cid:27)(cid:27) (cid:27)(cid:27) ििििववववििििववववधधधधतततताााा ककककाााा ललललााााभभभभ (cid:30)(cid:30)(cid:30)(cid:30)ााााJJJJतत तत ककककररररननननाााा---- वैिवcय आधा(cid:10)रत िव!ुत िविनमय के लाभ .ा*त करना; इसका आशय यह ह ै 7क भौगोिलक ि,थितया,ँ मौसम, 7दन का समय व 7)या&म क वैिवcय के कारण उ&प ादन और मांग पैटन( म(cid:19) 8े9ीय आधार पर अंतर को पूरा करने के िलए लेनदने करना । 4444---- >>>>ााााययययाााा55!!55!! वव व व ययययनननन ककककेेेे ििििललललएएएए ससससKKKKििििललललययययतततत (cid:30)(cid:30)(cid:30)(cid:30)ददददाााानननन ककककररररननननाााा ---- के34 ीय पारेषण कंपनी (सीटीयू) व रा2य पारेषण कंपनी (एसटीयू) पारेषण के आयोजना एवं िवकास के िलए जवाबदहे ह।g इस .7)या म(cid:19) माग(दश(न हते ु के34 ीय िव!ुत .ािधकरण ने राJ(cid:26) ीय िव!ुत योजना नामक माग(दtशका तैयार कV ह।ै रा2य पारेषण कंपनी रा2य म(cid:19) िव!ुत के पारेषण के िलए उ&त रदायी ह।g दशे म(cid:19) ससु म3व यन आधा(cid:10)रत पारेषण आयोजना के िलए के34 ीय पारेषण कंपनी रा2य पारेषण कंपिनय^ एव ं अ3य सहभािगय^ म(cid:19) सम3व य करता ह।ै उ&प ादन 8े9 के िवलाइस(cid:19)सीकरण के बाद राJ(cid:26) ीय िव!ुत आयोजना म(cid:19) वा,त िवक िवकास इसके साथ जुड़ े उपागम^ म (cid:19) प(cid:10)रवत(न^ के Wप म(cid:19) दtशत हो सकता ह।ै पारेषण िवकास काय()म म(cid:19) यथा समयानWु प संशोधन िनिहत ह।g अत: दीघ(कािलक प(cid:10)रदiृ य म(cid:19) राJ(cid:26) ीय िव!ुत आयोजना म(cid:19) प(cid:10)रवत(न 7कय े जाने कV आवiय कता ह।ै नए िव!ुत उ&प ादन के34 ^ के बनने के बाद इनसे जुड़ े पारेषण .णाली को ज(cid:18)द ही योजना बनाकर 7)याि3वत करना होगा। 5555---- ससससििुुििुु ववववधधधधााााददददााााययययीीीी LLLLयय यय ाााापपपपाााारररर---- िव!ुत अिधिनयम 2003 के अनुसार पारेषण .णाली म(cid:19) सुिवधादायी sय ापार को िविशJट गितिविध के Wप म(cid:19) मा3य ता दी गयी ह।ै इस ि,थित म(cid:19) और अभेदभावकारी खुली बाजार sय व,थ ा म(cid:19) संभव ह ै 7क पारेषण .णाली को बाजार कV ताकत (cid:19) िव!तु .वाह कV sय व,थ ा को .भािवत कर(cid:19)। अत: पारेषण नेटवक( म(cid:19) अनुिचत एव ं उिचत का पुनमू((cid:18)य ांकन करना होगा। िबजली के बाजारीकरण¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 493 के िलए उिचत .णाली का सशि‚करण करना होगा और संभािवत पारेषण .णाली म(cid:19) के34 ीय व रा2य कंपिनय^ के मcय के34 ीय िव!ुत .ािधकरण को सम3व यक कV भूिमका िनभानी होगी। 6666---- ततततककककननननीीीीकककक.... एएएएवववव ंं ंं ललललाााागगगगतततत ककककाााा इइइइ(cid:16)(cid:16)(cid:16)(cid:16)टटटट ततततममममीीीीककककररररणणणण---- पारेषण नेटवक( के समुिचत िवकास के िलए सुसंगत तकनीकV िवiल ेषण और तकनीकाtथक मू(cid:18)य ांकन करना होगा। इसके िलए अित(cid:10)र(cid:25)त उ>च वो(cid:18)ट ेज, ए.सी., एचवीडीसी, हाइिRड, म(cid:18)ट ी स6कट, म(cid:18)ट ी कंड(cid:25)ट र लाइन(cid:19), जीआईएस .ित7)याकारी .ितपूtत, गितक .ितपूtत आ7द का .योग 7कया जा सकता ह।ै तकनीक के .योग से पारेषण .णाली कV लागत को ता6कक बनाना उसके उoiे य ह।g 7777---- ममममाााागगगग(cid:12)(cid:12)!!(cid:12)(cid:12)!! थथ थथ अअअअििििधधधधककककाााारररर ((((ररररााााइइइइटटटट आआआआफफफफ ववववेे))े)े) ककककाााा इइइइ(cid:16)(cid:16)(cid:16)(cid:16)टट टट ततततममममीीीीककककररररणणणण- दशे के समS िवकास एवं बढ़ती जनसंmय ा को दखे ते aये िव!ुत पारेषण के 8े9 म(cid:19) मुिiकल (cid:19) लगातार बढ़ रहd ह।g अत: इस सम,य ा के िनदान के िलए आवiय क ह ै िव!ुत पारेषण कॉ(cid:10)रडोर का इJट तमीकरण करने कV आवiय कता ह।ै इस हते ु लागत कV दिृ l से ता6कक उ>च 8मता कV लाइन^ का .योग, म(cid:18)ट ी स6कट लाइन(cid:19), ए(cid:18)य ुिमिनयम-एलॉय कंड(cid:25)ट र या सीरीज कंपंनशेसन व फै(cid:25)ट स िडवाइस के .योग से पारेषण कV लाइन^ कV 8मता म(cid:19) अिभवृिh करना आ7द के .योग के िलए योजना ,त र पर िवचार 7कया जाना चािहये। 8888---- चचचचररररणणणणबबबबBBBB ििििववववककककाााासससस---- उ&प ादन 8मता का सृजन कई चरण^ म(cid:19) होता ह।ै िलहाजा पारेषण 8मता म(cid:19) वृिh भी चरणबh होगी। पारेषण 8मता म(cid:19) वृिh उ>च तर वो(cid:18)ट ेज िविन6दJट लाइन^ को कम वो(cid:18)ट ेज पर चाज ( करके कV जा सकती ह।ै दसू रा तरीका यह हो सकता ह ै 7क बaप(cid:10)रपथ लाइन^ को फेजीकरण के माcय म से 7कया जाय े या सीरीज कDप नसेशन का .योग 7कया जाये। 9999---- पपपपूवूवूवूवPPPPतततत तत तत् ् ् ् रररर भभभभााााररररतततत सससस ेे ेे उउउउRRRRचच चच (cid:7)(cid:7)(cid:7)(cid:7)ममममतततताााा ककककेेेे ककककोोोो((((ररररडडडडोोोोरररर- दशे के पूव=&त र भाग म(cid:19) जल िव!ुत ऊजा( .चुर मा9ा म(cid:19) उपल(cid:4)ध ह।ै इसकV अब तक मा9ा 30-35 गीगावॉट तक िवकिसत कV जा चुकV ह।ै जल िव!ुत ऊजा( का िवकास पूव=&त र भारत म(cid:19) इसिलये जWरी ह ै (cid:25)य ^7क 8े9 के औ!ोिगक िवकास के साथ ,थ ानीय आपूtत को भी पूरा7कया जा सके। उ(cid:18)ल ेखनीय ह ै 7क पूव=&त र भारतम(cid:19) जल िव!तु का योगदान बaत 2य ादा हो सकता ह।ै भिवJय म(cid:19) जल िव!ुत ऊजा ( का 70 .ितशत भाग आने वाले समय म(cid:19) पूव=&त र भारत से .ा*त होगा। इस 8े9 ऊजा ( कV सतत .ािr से यह ,प Jट ह ै 7क यहाँ से उ&त र, दि8ण, पिZम 8े9^ को िव!तु पारेषण सरल ह ै (cid:25)य ^7क यहा ँ पर उ&प ादन कV तुलना म(cid:19) मांग कम ह ै ,थ ानीय आपूtत के बाद िजन 8े9^ म(cid:19) मांग 2य ादा ह ै वहा ँ पर ऊजा( का पारेषण 7कया जा सकता ह।ै इसी के साथ पड़ोसी दशे भूटान स े उ&त र, पिZम और दि8ण 8े9^ म(cid:19) िव!ुत पारेषण संभव हो सकता ह।ै पूव=&त र 8े9 म(cid:19) िव!ुत का उ&प ादन मांग कV तुलना म(cid:19) काफV अिधक ह ै अत: पवC 8े9 अपने कोयले के भंडार को आरि8त रख सकता ह।ै पूवC 8े9 भिवJय म(cid:19) भी अपनी िव!तु िनयात( क कV भूिमका बरकरार रखेगा। अत: पूव=&त र 8े9 उ&त र/पिZम/दि8ण 89े ^ को िव!ुत का पारेषण लगभग 2000 7कलोमीटर कV तय करके संभव ह।ै इस पर अमल करने के िलए आने वाले बाधाk का सही अनुमान लगाकर एचवीडीसी और उ>च 8मता कV 400 के.वी. का हाइिRड नेटवक( िस,ट म का िवकास करना होगा। इस िवकास के िलए चरणबh तरीके से पूव=&त र म(cid:19) िव!ुत उ&प ादन िवकास के िलए काय()म का 7)या3व यन करना होगा। पूव=&त र भारत से िव!ुत के आपात के िलए 1800 केवी एचवीडीसी उ>च 8मता कV लाइन िवचारणीय ह।ै उ>च 8मता वो(cid:18)ट ेज के अनु.योग म(cid:19) .मुख कारक हg-लाइनलॉस म(cid:19) कभी लानाऔर 7)या3व यन कV उिचत युि‚। 11110000---- ददददललललददददललललीीीीयययय औऔऔऔरररर ततततटटटटववववततततTTTT (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ,,,, मममम (cid:27)(cid:27) (cid:27)(cid:27)उउउउDDDDपप पप ााााददददनननन ककककाााा ससससमममम1111 AAAAपपपप सससस ेे ेेउउउउपपपपभभभभोोोोगगगग---- दलदली और तटवतC 8े9^ म(cid:19) उ&प ा7दत िव!ुत के समS उपभोग के िलए दशे म(cid:19) लोड स(cid:19)टस ( म(cid:19) उ>च 8मता का पारेषण .णाली िवकिसत करना होगा। (cid:25)य ^7क पारेषण म(cid:19) लंबी दरू ी कV वजह स े िव!तु का एक बaत बड़ा भाग लाइन लॉस के Wप म(cid:19) बेकार चला जाता ह।ै आर.ओ.ड(cid:4)(cid:18) य ू. ऑ*ट ीमाइजेशन494 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] िSड म(cid:19) 7)या&म क लचीलापन और पारेषण कV अनुपल(cid:4)ध ता कV वजह से अनु&प ादन कV ि,थित आ7द बाधाय(cid:19) ह g िजनका िनवारण आयोजना म(cid:19) करता ह।ै 11111111---- (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ीीीीयययय िििि1111डडडड,,,, ककककाााा ससससतततततततत ििििववववककककाााासससस ::::---- िSडो का िवकास सतत Wप से होना चािहए िजससे 8े9^ म(cid:19) िव!ुत माँग के अनुWप हो सके। यह इस .कार से हो िजससे उ&प ादन के34 ^ से दरू दराज के 8े9^ म(cid:19) िव!ुत आपूtत माँग के अनुWप हो सके। पारेषण .णाली िव!ुत .वाह के पैटन( के बदलाव^ को संभाल सके और अंतर रा2य पारेषण म(cid:19) अंतरा रा2य 8मता म (cid:19) अिभवृिh कर सके। इस .णाली को इस तरह से सश(cid:25)त 7कया जाए िजससे ऊजा ( का अभाव समा*त हो जाये और सम,य ा का दीघ(कािलक समाधान 7कया जाए। 11112222---- ससससददुुददुु ढ़ढ़ढ़ढ़ृृृृ अअअअििििखखखखलललल भभभभााााररररततततीीीीयययय िििि1111डडडड ::::---- ‘’सभी को िबजली उिचत दर पर,’’ इस नारे को च(cid:10)रताथ( करन े के िलए सश(cid:25)त अिखल भारतीय िSड का िवकास करना होगा िजससे दशे म(cid:19) िव!ुत .णाली को िनयोिजत 7दशा म(cid:19) िवकिसत करने कV 7दशा म(cid:19) .य&न संभव हो सके। सश(cid:25)त अिखल भारतीय िSड से उन 8े9^ म(cid:19) भी िव!ुत कV उपल(cid:4)ध ता सुिनिZत कV जा सकेगी जहाँ पर िव!ुत कV उपल(cid:4)ध ता माँग के अनुWप काफV कम ह।ै इससे पारेषण म(cid:19) बाजार uारा िनधा((cid:10)रत उ&प ा7दत माँग को ओपन ए(cid:25)स स े कV सुिवधा .ा*त होगी और आपूtत पर इसका प(cid:10)रणाम यह होगा 7क िवतरण म(cid:19) िव!ुत मू(cid:18)य म(cid:19) कमी आएगी और इसस े उपभो(cid:25)त ा को सीधा फायदा होगा। 11113333---- उउउउनननन (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ,,,, िििि1111डडडड ससससबबबब(cid:12)(cid:12)(cid:12)(cid:12)टट टट ेेशशेेशशनननन बबबबननननााााननननाााा जजजजहहहहाााा ँँ ँँपपपपरररर 333300000000 ममममगगेेगगेे ााााववववॉॉॉॉटटटट सससस ेे ेेअअअअििििधधधधकककक हहहहोोोो---- िव!ुत का रा2य ^ म(cid:19) .ेषण, पारेषण .णाली का एक अहम काय( ह।ै इस कोिशश स े आई एस टी एस। ,ट ेट िSड सब,ट ेशन (400 केवी िSड ,ट ेशन) कV ,थ ापना उन 8े9^ म(cid:19) सुिनिZत हो सकेगी जहा ँ पर माँग 300 मेगावॉट से अिधक ह।ै इससे भारत म(cid:19) उ>च 8मताकV िSड को बढ़ाने म(cid:19) मदद िमलेगी। 11114444---- 222222220000 ककककेेेेववववीीीी औऔऔऔरररर 111133332222 ककककेेेेववववीीीी ककककेेेे ििििललललएएएए पपपपााााररररेेेेषषषषणणणण (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी ककककेेेे ययययोोोोगगगगकककक ककककाााा ििििववववककककाााासससस –––– 220 व 132 केवी कV आपूtत के िलए पारेषण .णाली का जोड़ना होगा और उप पारेषण और िवतरण .णाली को भी जोड़ा जाए।ं आपूtत म(cid:19) वृिh होने पर उ&प ादन व पारेषण के सम3व यन से िव!ुत आपूtत कV मांगको पूरा 7कया जा सकता ह।ै दशे म(cid:19) उपभो(cid:25)त ाk का सीधा फायदा िमलेगा। 3333....3333 LLLLयय यय ववववससससााााििििययययकककक JJJJलल लल ााााटटंंटटंं ,,,, ककककेेेे ििििललललएएएए पपपपााााररररेेेेषषषषणणणण आआआआययययोोोोजजजजननननाााा मममम (cid:27)(cid:27)(cid:27)(cid:27)चचचचननुुननुु ौौौौििििततततययययाााा ंं ंं 3333....3333....1111 िव!तु अिधिनयम 2003 के अिधिनयमन से अब काफV sय ापक िव!ुत बाजार का माग( .श,थ aआ ह,ै जो कभी दीघ(कािलक िव!तु खरीद करार (पीपीए) जैसी िवशेषताk के िलए जाना जाता थ और िवतरण कंपिनय^ तथा उपभो(cid:25)त ाk को पूितकता(k के िवक(cid:18)प उपल(cid:4)ध नहd थे । उ&प ादन कV डी लाइस(cid:19)Gसग और कैिपटव उ&प ान *ल ांट^ पर से िनयं9ण समा*त करन े के अलावा िव!ुत अिधिनयम, 2003 के अंतगत( पारेषण लाइस(cid:19)सधारी कंपिनय^ को यह अिनवाय( कर 7दया गया ह ै 7क वे पारेषण .भार^ के भुगतान पर िव!ुत के पारगमन (sह ीGलग) के िलए 7कसी भी लाईस(cid:19)सधारक अथवा उ&प ादन कंपनी को अपनी पारेषण .णाली का भेदभाव सिहत मु(cid:25)त अिभगम उपल(cid:4)ध कराएगं ी। इससे उ&प ादक/sय ापारी के बीच ,व ,थ .ित,प धा( का वातावरण उ&प 3न होगा और वे अपनी सुिवधानुसार Sाहक^ का चयन कर सक(cid:19)गे। 3333....3333....2222 इस अिधिनयम के अनुसार उ&पादन *ल ांट^ कV .7)या को उदारीकृत 7कया गया ह ै और कोई भी उ&प ादन कंपनी िव!तु उ&प ादन संय9ं कV ,थ ापना कर सकती ह,ै चला सकती ह ै और रख रखाव कर सकती ह।ै इसका प(cid:10)रणाम यह aआ 7क बड़ी संmय ा म(cid:19) आईवीपी ने िव!ुत *ल ांट^ कV ,थ ापना इस आशय के साथ कV 7क वे िव!ुत बाजार के संवग{ म(cid:19) इसका कारोबार कर सक(cid:19)गे। िव!ुत बाजार के सवं ग{ म(cid:19) कारोबार कर सक(cid:19)गे। िव!तु बाजार के संवग( ह-ै दीघा(विध, मcय ाविध, अ(cid:18)प ाव िध, िuप8ीय या 7दन के बदले िविनमय आ7द। Pय ारहवd पंचवषCय योजना म(cid:19) िनजी 8े9 uारा 23,000 मेगावॉट िव!ुत का उ&प ादन ऑकिलत 7कया गया ह।ै इस 8े9का 12वd पंचवषCय योजना यह योगदान 50,000 मेगावॉट होगी इस अनुमान कV पिु l सी.अी.यू. ने कV ह।ै¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 495 3333....3333....3333 इसका कोई सु,प Jट ƒान नही ह ै 7क इसके 7कतन े लाभाि3व त aए ह ै या जब पारेषण आयोजना तैयार होता ह ै तो यह 7कतनेिव!तु *ल ाटं ^ के उ&प ादन को पारेिषत करेगा, केवल िचि3हत 8े9/लाभाथC का cय ान पारेषण आयोजना म(cid:19) रखा जाता ह।ै ऐसे प(cid:10)रदiृ य म(cid:19) उिचत पारेषण अधोसंरचना के सजृ न कV आवiय कता ह,ै िजसम(cid:19) यह नए उ&प ादन *ल ांट^ वहन करने म(cid:19) स8महो। इस अिनिZता के माहौल म(cid:19) पारेषण आयोजना एक चुनौतीपूण( काय( ह।ै ऐस े पारेषण म(cid:19) दबाव का खतरा ह।ै 3333....3333....4444 उ&प ादक uारा दीघा(विध ए(cid:25)स ेस के अनु.योग पर आधा(cid:10)रत पारेषण .णाली को उ&प ादन *ल ांट^ स े उ&प ा7दत िव!ुत को त&क ाल भेजे जाने के िलए िनयोिजत 7कया जाता ह।ै .णाली आयोजना का अcय यन यह बताता ह ै 7क िव!तु ऊजा( सव@8ण uारा घोिषत सभं ािवत माँग 7कतनी ह ै और वा,त िवक लोड रा2य या 8े9 म (cid:19) 7कतना ह।ै िविभ3न रा2य ^ म(cid:19) लोड का अनुमान 7कसीभी अsय वहा(cid:10)रक पीपीए पर आधा(cid:10)रत होता ह।ै अत: इस .7)या म(cid:19) िव!ुत उिचत अंतर रा2य पारेषण 8मता उ&प ादन *ल ांट^से पaचँ ती ह।ै हालाँ7क वा,त िवक लाभाथC/िथय^तक िव!ुत कV पaचँ न े म(cid:19) कुछ परेशािनयाँ आती ह।ै आई एस टी एस uारा संपोिषत । .वािहत िव!ुत के अवशोषण के िलए उिचत अंतरा रा2य पारेषण .णाली कV भी जWरत ह।ै 3333....3333....5555 :::: आयोजना .7)या म(cid:19), कुछ िडजाइन माtजन बनाया जाता ह ै िजसस े दीघा(विध के नेटवक( भिवJय म(cid:19) होन े वाली वृिh को वहन करने म(cid:19) स8म हो। यह माtजन 7)या&म क और िवiव सनीय माtजत होते ह ै जो 7क .कृित से चर होते ह,g .णाली कV ि,थित और भार के .वाह के ढ़ंग पर िनभ(र करते ह।g उस समय रा2य ^ के िलये .णाली म(cid:19) पया(*त अित(cid:10)र(cid:25)त 8मता उपल(cid:4)ध करा दी जाये ता7क रा2य अपने दीघ(कािलक पीपीएज से अिधक िव!तु खरीद सक(cid:19)। हालां7क, इन माtजन^ का .योग एक सीमा तक ही 7कया जा सकता ह ै और य7द रा2य अपनी पूव( घोिषत आवiय कता स े अिधक िव!ुत खरीदना .ारDभ करते ह g तो संकुलन हो सकता ह।ै 3333....4444 हहहहााााििििललललययययाााा अअअअननननभभुुभभुु वववव सससस ेे ेेससससीीीीखखखख 3.4.1 पारेषण िSड के समुिचत सुरि8त िवकास के )म म(cid:19) पारेषण आयोजना म (cid:19) कुछ आधारभूत िनयम बाजार म (cid:19) मौजूदा कंपिनय^ (आपूtतक&त ा() के िलए तय 7कए जान े चािहए। इस संबंध म(cid:19) िनDन िलिखत सुझाव भावी योजना के िलए 7दए गए ह:ै 1. जहाँ तक संभव हो िललोइंग के uारा अंत(cid:10)रक कनेि(cid:25)टिवटी या अनदखे ा 7कए जान े चािहए। 2. कनेि(cid:25)टिवटी का अनुरोध और दीघ(काल आपूtत कV जWरत एक साथ पूरा 7कया जाना चािहए। दीघा(विध के िलए .णाली को सश(cid:25)त 7कया जाना चािहए। एल टी. ए. के िबना कने(cid:25)ट िवटी पारेषण िSड को ओवरलोGडग कV वजह बन सकती ह।ै मु(cid:25)त कने(cid:25)ट िवटी का .ावधान .योगकता(k के िलए एलटीए कV अनदखे ी करना वरदान सरीखा ह।ै 3. िपछले कुछ बरस^ म(cid:19) आईएसटीएस तं9^ का आयोजना व 7)या3व यन का आधार आईपीपी uारा उपल(cid:4)ध कराए गए 8े9ीय मांग था। के34 ीय िव!ुत िनयामक आयोग के िनयमानुसार माँग का ऑकलन िपछले तीन वष{ कV अिधकतम माँग के आधार पर करना चािहए िजसे आई पी पी सामा3य तौर पर संकिलत नहd करते ह।ै यह पारेषण भार और माँग कV पूtत से जुड़ा िवषय ह ै िजसम(cid:19) िSड सुर8ा सव=प(cid:10)र ह।ै दशे P यारह उ>च 8मता के कॉ(cid:10)रडोर^ कV योजना इस आधार पर तैयार हो चुकV ह ै और सीईआरसी िव!ुत उ&प ादन प(cid:10)रयोजनाk के सतत िवकास संƒान म (cid:19) रखत े aए 7)या3व यनकV ,व ीकृित द े दी ह।ै दीघा(विध म(cid:19) पारेषण के उपयोगक&त ा(k को cय ान म(cid:19) खते aए पारेषण आयोजना कV पुन(समी8ा कV जWरत ह।ै यह संभािवत ह ै 7क भिवJय म(cid:19) उपयोगक&त ा(k/उ&प ादक^ के िलए एल टी ए कV .7)या म(cid:19) िव!ुत आपूtत एवं मLग का लगभग 85% अनुभाग कV जानकारी सुिनिZत कV जानी चािहए। यह पपपपीीीीपपपपीीीीएएएएएएएएसससस के दीघा(विध म(cid:19) िव!ुत मागँ पर आधा(cid:10)रत ह।ै इसम(cid:19) क(cid:19)4ीय िव!ुत उ&प ादक जसै े एनटीपीसी,एएएएननननएएएएचचचचपपपपीीीीससससीीीी कV भूिमका उ(cid:18)ल ेखनीय होगी।496 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] उपरो(cid:25)त सुझाव के समथन( म(cid:19) िनDन िवचार ह-g • अनुभव दशा(ता ह ै 7क यह संभव ह ै 7क ,व ,„ य पारेषण म(cid:19) 15% 8मता का इ,त ेमाल ननननाााा सके जो 7क पारेषण प(cid:10)रदiृ य समान ह।ै • य7द 85% िव!ुत कV आपूtत के िलए पीपीए के uारा दीघ(विध के िलए समझौता 7कया गया ह ै तो आईएसटीएस का आयोजना एवं 7)या3व यन रा2य कV सीमा को cय ान म(cid:19) रखकर7कया जाना चािहए और रा2य (cid:26)ांसिमशन यू(cid:10)टिलटी को भी समि3वत एस टी यू नेटवक( का लूप बनाना चािहए। • यह िवचारणीय ह ै 7क िड,क ॉम दीघा(िवध के ज(cid:10)रए पीपीए बेस लोड सुरि8त बनाए ं । मौसमी माँग और दिै नक जWरत के संतलु न अ(cid:18)प ाविधबाजार के अनुWप हो (cid:25)य ^7क अ(cid:18)प ाविध बाजार म(cid:19) कVमत(cid:19) प(cid:10)रवत(नशील होती ह।g अ(cid:18)प ाविध आपूtत मच…ट केपेिसटी कV अित(cid:10)र(cid:25)त 8मता, केि*टन संय9^, सहउ&प ादन *ल ांट^, अित(cid:10)र(cid:25)त िड,क ॉम व रा2य रा2य सरकार^ uारा उ&प ा7दत जल िव!ुत आ7द स े .ा*त होती ह।ै अत: मच…3ट uारा यह आपूtत अ(cid:18)प मा9ा म(cid:19) दी संmय ा ह।ै अ(cid:18)प विध बाजार म(cid:19) आपूtत संतुलन के िलए िSड का ,थ ािय&व आवiय क ह।ै यह वैि(cid:18)पक असमय अंतर प(cid:10)रवत(न है। दसू रे छोर पर इसम(cid:19) अ&य ािधक बढ़ो&त री पारेषण पर दबाव बढ़ा सकता ह ै और िSड कV सुर8ा खतरे म(cid:19) पड़ सकती ह।ै 3.4.2 समtपत पारेषण लाइन जो 7क उ&प ादन *ल ाटं ^ से आती ह ै उनकV .कृित रेिडयल हो। लाइन(cid:19) उ&प ादन *ल ांट^ से जुड़ी बaसमtपत लाइन(cid:19) जो 7क एक स े अिधक िSड से जुड़ी हो उनका आयोजना नहd करना चािहए। 3.4.3 िव!तु अिधिनयम के अनुभाग के 3a के अनसु ार रा2य पारेषण यू(cid:10)टिलटी अपने आयोजना म(cid:19) अतं रा(2य पारेषण म(cid:19) सी ए व सी टी यू का सहयोग िलया जाए। यहाँ पूव( के कुछेक उदाहरण ह ै जहाँ पर एस टी यू मह&व पूण ( पारेषण .णाली का आयोजना 7कया ह ै या बड़ े उ&प ादन *ल ांट^ कनेि(cid:25)टिवटी म(cid:19) सी ई ए व सी टी यू के िबना आयोजना 7कया हो और इसका प(cid:10)रणाम टीएसटीएस/राJ(cid:26) ीय िSड पर दबाव/7)या&म क Wप म(cid:19) 7दखा दो। एसटीयू को अपने तं9^ म(cid:19) सीईए व सीटीयू शािमल करना चािहए िजसे ,ट (cid:19)Gडग कमेटी ने भी सतं ुJट 7कया ह।g क) 400 केवी व इससे अिधक 8मता वाली लाइन(cid:19) ख) नवीकरणीय उ&प ादन का बड े पैमाने पर दोहन ग) 500 मेगा वॉट से अिधक 8मता के *ल ांट^ से िव!ुत िनJक ष(ण के िलए पारेषण .णाली 3333....5555 पपपपााााररररेेेेषषषषणणणण आआआआययययोोोोजजजजननननाााा ममममााााननननददददडडंंडडंं ,,,, कककक.... (cid:30)(cid:30)(cid:30)(cid:30)ममममखखुुखखुु ििििववववशशशशषषषषततततााााएएएए ंं ंं पारेषण आयोजना म(cid:19) ऐसे .णाली ,व ीकाय( 7कया जाए िजसका .दश(न िवiव सनीय हो और आवiय कताk कV पूtत करता हो। .णाली कV िवiव सनीयता राJ(cid:26) ीय िव!ुत आयोजना 2007 और पारेषण आयोजना के तरीके (1994) म(cid:19) िनिहत ह ै िजसे भारत सरकार न े अिधसूिचत 7कया ह।ै पारेषण आयोजना के .मुख Gबद ुह ै : 1. पारेषण .णाली कV आयोजना एकVकृत तरीके स े हो 2. अंतरा रा2य व अंतर रा2य कV खपत का कुल योग ऑि*टमाइजेशन म(cid:19) सिDमिलत 7कया जाना चािहए 3. राJ(cid:26) ीय िSड को िव!ुत का .वाह अबाध Wप से सभी 89े ^ कV सीमा म(cid:19) करना चािहए 4. राJ(cid:26) ीय दिृ l म(cid:19) यथा.करण बड़ े उ&प ादन *ल ांट^ (3000 मेगावाट या अिधक) और म(cid:18)ट ी लाइन को(cid:10)रडोर^ से पारेषण .णाली कV उपयु(cid:25)त ता का परी8ण करने के िलए एन-2 कसौटी को लागू 7कया जा सकता ह।ै जब7क, 8े9ीय आयोजना के िलए एन-1 कसौटी को लागू रखा जा सकता ह।ै हाला7ं क, एन-1 का .योग िनयिमत Wप से िव!ुत के .चालन के दौरान िबना भार पृथ(cid:25)क रण या उ&पादन का पुनय=जन 7कय े पारेषण कV 8मता का परी8ण करन े के िलए तथा एन-2 का .योग िनयिमत Wप से .चालन के दौरान िबना भार पृथ(cid:25)क रण पर3त ु उ&प ादन के पुनय=जन uारा पारेषण कV 8मता का परी8ण करने के िलए 7कया जायेगा।¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 497 5. अंतर 8े9ीय िविनमय व अंतर कने(cid:25)श न 8मता के आकँ लन म(cid:19) संयं9 का िम†ण---- के उ&प ादन म(cid:19) कमी, मौसमी वैिवcय ता, आपरDप ा(cid:10)रक उ&प ादन (cid:129)ोत^ म(cid:19) प(cid:10)रवत(न, लोड कV भिवJय वाणी म(cid:19) गलती आ7द को अcय 8 म(cid:19) समािहत 7कया जाना चािहए । 6. अंतर 8े9ीय िविनमय म(cid:19) िव!ुत कV अिधकता एवं कमी का िविभ3न qो 9^ म (cid:19) होना और इसके समाधान के िलए राJ(cid:26) ीय िSड के .योग पर िवचार करना चािहए 7. पारेषण .णाली कV उपयु(cid:25) तता परी8ण के अनWु प होना चािहए। यह परी8ण िविभ3न लोड उ&प ादन प(cid:10)रदiृ य म(cid:19) होना हो। जो 7क एक या एक से अिधक परवेश से जुड़ाहो िजससे पारेषण .णाली पर अिधकतम दबाव झेलने म(cid:19) स8म हो सके। • SीJम काल म(cid:19) उ>च लोड • SीJम काल म(cid:19) िनDन लोड • शीत काल म(cid:19) उ>च लोड • शीत काल म(cid:19) िनDन लोड • मानसून म(cid:19) उ>च लोड • मानसून म(cid:19) िनDन लोड 8. .ेषण प(cid:10)रदiृ य ^ म(cid:19) अिधकतम (cid:26)ांसफर अंतर खे9 कॉ(cid:10)रडोर^ म(cid:19) पारेषण .णाली कV उपयु(cid:25)त ता का िनधा(रणम(cid:19) 8े9ीय वैिवcय ता मह&व पूण( ह।g यह वैिवcय ता आयात िनयात( (cid:26)ांसफर के प(cid:10)रदiृ य ^ म(cid:19) ह।ै 9. पारेषण .णाली पर बोझ म(cid:19) बढ़ो&त री कV सभं ावना का अcययन करन े के िलए उ&प ादन .ेषण के संबंध म (cid:19) संवेदनशीलता या माँग भार का भी अcय यन 7कया जाना चािहये। 10.अ3त र- संबंध (cid:26)ांसफाम(र (आइसीटी) का आकार एवं संmय ा िजनकV आयोजना इस .कार से हो 7क 7कसी एक भी इकाई का आपूtत sय वधान शेष आईसीटीज पर या अ3त िनtहत .णाली पर कोई अित(cid:10)र(cid:25)त भार न डाले। 11. सामा3य िनयम के तहत, आइएसटीएस िनDन िलिखत आकि,मक आपूtत sय वधान के िव}h सुरि8त एव ं सहन करने म(cid:19) समथ( होगा। क. िनयिमत Wप से िव!ुत के .चालन के दौरान िबना भार पृथ(cid:25)क रण या उ&पादन का पुनय=जन 7कय े सहन करने कV 8मता- - 132 केवी डी/सी लाइन का आपूtत sय वधान या - 220 केवी डी/सी लाइन का आपूtत sय वधान या - 400 केवी एस/सी लाइन का आपूtत sय वधान या - 400 केवी एस/सी लाइन (†णे ी .ितकारी के साथ) आपtू त sय वधान या - एकल अंतर-संबंध (cid:26)ांसफाम(र का आपूtत sय वधान या - एचवीडीसी बाइपोल लाइन के एक पोल का आपूtत sय वधान या - †ेणी .ितकारी के िबना 765 केवी एस/सी लाइन का आपूtत ‡वधान। ख. िनयिमत Wप स े .चालन के दौरान िबना भार पृथ(cid:25)क रण पर3त ु उ&प ादन के पुनय=जन uारा सहन करने कV 8मता- - 400 केवी एस/सी लाइन (टीसीएससी सिहत) का आपूtत sय वधान या - 400 केवी डी/सी लाइन का आपूtत sय वधान या - एचवीडीसी बाइपोल लाइन के दोन^ पोल^ का आपूtत sय वधान या - 765 केवी एस/सी लाइन (†णे ी .ितकारी के साथ) का आपूtत sय वधान ।498 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 12. उपयु((cid:25)त आकि,मकताk को 220 केवी डी/सी लाइन या 7कसी दसू रे गिलयारे म (cid:19) 400 केवी एस/सी लाइन के जो उसी उपके34 से िनग(िमत हो रही ह ै पवू (- आकि,म क .णाली अव8य (योिजत आपूtत sय वधान) माना जाना चािहये। सभी उ&प ादन इकाइयाँ अपने .ितघाती 8मता व)^ के भीतर .चािलत हो सकती ह g और नेटवक( उ&प ादन वो(cid:18)ट ेज .ोफाइल भी िविन6दJट वो(cid:18)ट ेज सीमाk के भीतर रहनी चािहये। िवiव स नीयता के िलए अब अपनाये जाने वाल े नािभकVय ऊजा ( के34^ के िनJ) मण .णाली के िलए आयोजना कV कसौटी को 7कसी एक प(cid:10)रपथ के आपूtत sय वधान पर यह मानकर िवचार करना चािहय े 7क यह उसी के34 के दसू रे प(cid:10)रपथ का पूव( आकि,मक अव8य ह।ै यह .भावी ढ़ंग से िबना पुनय=जन ले7कन िबना अ3य पूव( आकि,मकता के एन-2 ह।ै 13.132 केवी या इससे ऊपर का ईएचवी उपके34 कV योजना कम से कम दो (cid:26)ांसफाम(र^ के साथ बनानी चािहये ता7क एक (cid:26)ासं फाम(र के खराब होने पर 7कसी 89े कV िव!ुत आपूtत बािधत न हो। 14.2000 मेगावाट या इसस े अिधक ऊजा( खपत वाले बड़ े शहर^ को िनबा(ध ऊजा ( आपूtत के िलए एन-2 कयौटी अपनाना चािहये। 15.अंतर-8े9ीय पारेषण 8मता समुिचत होनी चािहये जो आयातक 8े9 कV बड़ी मशीन^ के आपूtत sय वधान और संबंिधत 8े9^ के बीच एकल एस/सी अंतर- 8े9ीय लाइन के आपूtत sय वधान के अनुWप हो । ********¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 499 - 4 अअअअ(cid:2)(cid:2)(cid:2)(cid:2)ययययाााायययय आआआआययययोोोोजजजजननननाााा एएएएवववव ंं ंं ििििववववककककाााासससस (cid:6)(cid:6)(cid:6)(cid:6)(cid:27)(cid:27)(cid:27)(cid:27)(cid:28)(cid:28)(cid:28)(cid:28)ययययाााा 4444....1111 ििििवववव(cid:20)(cid:20)(cid:20)(cid:20)तततुुतुु (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी आआआआययययोोोोजजजजननननाााा हहहहततेेततेे ुु ुुससससममममिििि5555ववववतततत ययययोोोोजजजजननननाााा एएएएवववव ंं ंं(cid:12)(cid:12)(cid:12)(cid:12)थथ थथ ााााययययीीीी ससससििििममममििििततततययययाााा ँँ ँँ पारेषण .णाली संवध(न योजना के इJट तम िवकास हते ु अंतरा(2य ीय तथा अंत:रा2य ीय िSड .णाली कV समि3वत योजना बनाए जाने कV आवiय कता ह।ै अंतरा(2य ीय पारेषण .णाली के िवकास के संबंध म (cid:19) अंतरा(2य ीय पारेषण .णाली (आई.एस.टी.एस.) तथा रा2य िव!ुत िनकासी िब3द /ु,थ ल पर रा2य िSड एवं आई.एस.टी.एस. uारा उ3ह (cid:19) िव!ुत आपूtत और उनम(cid:19) अित(cid:10)र(cid:25)त िवiव सनीयता पैदा करने पर मुmय त: cय ान क(cid:19)74त 7कया जाना ह।ै अंत:रा2य ीय पारेषण .णाली (आई.एस.टी.एस.) के िवकास हते ु आई.एस.टी.एस. स े .ा*त िव!ुत को पारेिषत करन े के िलए रा2य िSड, इसके िव!तु उ&प ादन के34^ और लोड के34 ^ कV 8मता को बढ़ाए जाने पर भी cय ान क(cid:19)74त 7कया जाना ह।ै ि़व!ुत अिधिनयम 2003 कV धारा 73 (क) के अंतग(त अपने काय{ एवं दािय&व ^ के Wप म(cid:19) क(cid:19)4ीय ि़व!ुत .ािधकरण uारा एकVकृत आयोजना का सम3व यन 7कया जा रहा ह।ै इस उoiे य को पूरा करने और एकVकृत आयोजना को 7)याि3वत करने के िलए क(cid:19)4ीय ि़व!ुत .ािधकरण न े पारेषण संवध(न के िलए ठोस .,त ाव तैयार करने हते ु पारेषण सेवाk के साथ-साथ अ3य ,ट ेकहो(cid:18)ड र^ के सम3व य से और उनसे िवचार-िवमश( कर ि़व!ुत .णाली आयोजना हते ु 8े9ीय ,थ ायी सिमितय^ (एस.सी.पी.एस.पी.) का गठन 7कया ह।ै ि़व!तु .णाली आयोजना हते ु बनायी गई इन सिमितय^ म(cid:19) क(cid:19)4ीय िव!ुत .ािधकरण (सी.ई.ए.), सी.टी.यू., संबh रा2य ^ कV पारेषण कंपिनयां (एस.टी.यू.), संबंिधत 8े9 कV 8े9ीय िव!तु सिमितयL (आर.पी.सी.) तथा संबंिधत 8े9 म(cid:19) क(cid:19)4ीय 8े9 कV िव!ुत उ&प ादन कंपिनय^ के .ितिनिध शािमल ह।g िव!ुत उ&प ादन के िनJक ष(ण (इवैकुएशन) अथवा .णाली संवध(न हते ु तैयार कV गई अंतरा(2य ीय पारेषण .णाली पर संबंिधत 8े9^ कV ि़व!ुत आयोजना हते ु 8े9ीय ,थ ायी सिमितय^ (एस.सी.पी.एस.पी.) के साथ िवचार-िवमश( 7कया गया। दीघ(कािलक अिभगम अनु.योग^ (लांग टम( एक् सेस एि*लेकेशन) के प(cid:10)रणाम,व Wप उ&प 3न होने वाली आवiय कताk पर भी चचा ( कV गई और आवेदक^ कV उपि,थित म(cid:19) िव़ !ुत आयोजना हते ु 8े9ीय ,थ ायी सिमितय^ (एससीपीएसपी) uारा भी इस पर जोर 7दया गया । साझा मुo^ पर चचा( के िलए सम,त 8े9^ कV एक संयु(cid:25)त बैठक आयोिजत कV जाती ह।ै 4444....2222 पपपपााााररररेेेेषषषषणणणण ययययोोोोजजजजननननााााएएएए ंं ंं ततततययैैययैै ाााारररर ककककररररननननाााा 7कसी िनिZत समय-सीमा म(cid:19) .ारेषण .णाली कV योजना बनाने हते ु क(cid:19)4ीय िव!ुत .ािधकरण uारा बनाई गई योजनाk एवं िनधा((cid:10)रत अविध म(cid:19) इसे पूण( 7कए जाने हते ु संचािलत िव!तु उ&प ादन प(cid:10)रयोजनाk का cय ान रखना पड़ता ह।ै पारेषण .णाली अपे8ाk म(cid:19) उ&प ादन प(cid:10)रयोजनाk से िव!तु िनJक ष(ण .णाली (पॉवर इवैकुएशन िस,ट म) तथा एक समय-सीमा के अंदर लोड कV बढ़ती मांग को पूरा करने हते ु नेटवक( को सश(cid:25)त बनाना शािमल ह।ै इस .णाली के इJट तम उपयोग के मoने जर इस े राJ(cid:26) ीय ,त र पर तैयार 7कया जाता ह।ै इस .7)या म(cid:19) पारेषण हते ु सकल िनवशे म(cid:19) अंतरा(2य ीय सिहत अतं :रा2य ीय .णाली शािमल ह,ै िजसे अिध कतम युि‚संगत बनाया गया ह।ै क(cid:19)4ीय िव!ुत .ािधकरण uारा तैयार कV गई आगामी योजना तथा कौन सी इकाई आगामी 2-3 वष{ हते ु िव!तु उ&प ादन हते ु उपल(cid:4)ध हो पाएगं ी एव ं िवशेष 8े9 म(cid:19) लोड कV बढ़ती मांग को दखे ते aए सी.टी.यू. अथवा एस.टी.यू. को .ाथिमकताए ं तय करनी होती ह,g आवiय कता पड़न े पर इसकV समी8ा करनी होती ह ै तथा पारेषण .णाली के िव,त ार हते ु काय()म^ को 7)याि3वत भी करना पड़ता ह।ै 4444....3333 पपपपााााररररेेेेषषषषणणणण ययययोोोोजजजजननननााााUUUU ककककाााा VVVV>>>>ययययाााा5555वववव ययययनननन ((((आआआआईईईई....एएएएसससस....टटटटीीीी....एएएएसससस....)))) अंतरा(2य ीय पारेषण .णाली (आईएसटीएस) िवकास के प(cid:10)र.ेqय म(cid:19), िव!ुत ऊजा( योजना हते ु 8े9ीय सिमितय^ (एससीपीएसपी) म(cid:19) इन .,त ाव^ पर िनण(य िलए जान े के पiच ात संबंh िव!ुत ऊजा ( उ&प ादन ,ट ेशन^ के अिधJठ ापन काय)( म को cय ान म(cid:19) रखत े aए सी.टी.यू. तथा सी.ई.ए. इसके 7)या3व यन पर .,ताव को अिधकार .ा*त सिमित के सDम ुख िवचाराथ( .,त ुत करते ह।g अिधकार .ा*त सिमित कV500 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] िसफा(cid:10)रश के अनWु प एवं भारत सरकार uार इस पर िवचार 7कए जाने के उपरांत पारेषण योजनाk को काया(3व यन या तो टै(cid:10)रफ आधा(cid:10)रत .ितयोगी बोली .7)या (टै(cid:10)रफ बे,ड कंिप(cid:10)ट(cid:10)टव िबGडग .ॉसेस) अथवा टै(cid:10)रफ नीित के .ावधान^ के अनुसार सीटीयू के Wप म(cid:19) पॉवरिSड uारा िविनयिमत टै(cid:10)रफ के साथ लागत .भावी sय व,थ ा के अतं ग(त 7कया जाता ह ै । 4444....4444 अअअअततंंततंं ::::रररराााा""""यय यय ीीीीयययय पपपपााााररररेेेेषषषषणणणण (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी कककक.... आआआआययययोोोोजजजजननननाााा एएएएवववव ंं ंंििििववववककककाााासससस:::: रा2य िव!ुत कंपिनय^ को अतं :रा2य ीय पारेषण .णाली (इं(cid:26)ा-एसटीएस) का िवकास करना होता ह।ै उनकV नेटवक( आयोजना, योजना िनWपण तथा अतं :रा2य ीय पारेषण िवकास म(cid:19) अतं :रा2य ीय लाभ हते ु रा2य एव ं िनजी 8े9 कV िव!ुत उ&प ादन प(cid:10)रयोजनाk से िव!तु िनJक ष(ण (इवैकुएशन) के िलए पारेषण .णाली का िवकास, अंतरा(2य ीय पारेषण .णाली uारा उपल(cid:4)ध कराए गई िव!ुत ऊजा( कV खपत, रा2य के िविभ3न 8े9^ म(cid:19) िव!ुत कV बढ़ती मागं को पूरा करन े तथा उनकV .णाली कV िवiव सनीयता बनाए रखन े पर cय ान क(cid:19)74त 7कया जाना ह।ै िव!तु कV मांग म(cid:19) संभािवत वृिh को दिृ lगत करत े aए समि3वत िवकास .7)या हते ु ऐसा 7कया जाना उपयु(cid:25)त होगा 7क सरकारी पारेषण कंपिनयL 8े9ीय िSड .णाली कV िवकास योजनाk का लाभ लेते aए अपन-े अपने रा2य कV िव!तु योजना तैयार कर(cid:19) तथा वे वहL कV िव!ुत आवiय कताk पर िवशेष Wप से cय ान क(cid:19)74त कर(cid:19)। 4444....5555 पपपपााााररररेेेेषषषषणणणण आआआआययययोोोोजजजजननननाााा अअअअ;;;;यय यय ययययनननन :::: 4444....5555....1111 पपपपााााररररेेेेषषषषणणणण ययययोोोोजजजजननननाााा हहहहततेेततेे ुु ुुअअअअ;;;;यय यय ययययनननन एएएएवववव ंं ंंििििववववIIIIलल लल षषेेषषेे णणणण :::: आयोजना के चरण म(cid:19) िव!तु उ&प ादन प(cid:10)रयोजनाk हते ु पारेषण और .णाली-पुन.(वतन (िस,ट म (cid:10)र- इनफोस(म(cid:19)ट) कV आवiय कताk-अपे8ाk को तैयार 7कया गया ह,ै जो िविभ3न .ौ!ोिगकV िवक(cid:18)प ^, योजना मानदडं ^ एवं िविनयम^ के मoने जर िव,त तृ .णाली अcय यन एवं िवiल ेषण पर आधा(cid:10)रत होती ह।g ऐसे अcय यन/िवiल ेषण सम,य ा िवशेष पर आधा(cid:10)रत होते ह,g इसका आशय यह ह ै 7क 7कसी िवशेष कार(वाई म(cid:19) अcय यन/िवiल ेषण का केवल एक सब-सेट ही आवiय क होता ह।ै इस .णाली से संबंिधत .मुख अcय यन एवं िवiल ेषण म(cid:19) िनDन िलिखत काय( शािमल ह g - (cid:3) मांग-उ&प ादन िवiल ेषण (cid:3) िव!ुत .वाह अcय यन (cid:3) आकिiमकता संबंधी अcय यन (cid:3) साट( स6कट अcय यन / दोष िवiल ेषण (cid:3) वो(cid:18)ट ेज ि,थरता अcय यन (cid:3) अ(cid:18)प एवं दीघ(कािलक ग&य ा&म क ि,थरता (cid:3) तकनीकV-आtथक िवiल ेषण 4444....5555....2222 पपपपववूूववूू !! !!अअअअपपपप(cid:7)(cid:7)ेे(cid:7)(cid:7)ेे ााााएएएए ंं ंं:::: पारेषण आयोजना .7)या के अंतग(त िविव ध .णािलय^ के अcय यन/िवiल ेषण हते ु िनDन िलिखत आंकड़^/सूचनाk कV पूव( म(cid:19) ही आवiय कता होती ह ै : (cid:3) वत(मान .णाली पर आंकड़ े (cid:3) लोड पूवा(नुमान (cid:3) उ&प ादन िव,त ार योजना (cid:3) मौसम संबंधी लोड सृजन प(cid:10)रदiृ य (cid:3) नेटवक( िव,त ार िवक(cid:18)प (cid:3) पारेषण आयोजना मानदडं (cid:3) .ौ!ोिगकV िवक(cid:18)प (cid:3) अिधिनयम, िविनयम, नीितयाँ¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 501 4444....6666 (cid:30)(cid:30)(cid:30)(cid:30)ौौौौ(cid:20)(cid:20)(cid:20)(cid:20)ोोोोििििगगगगकककक.... ििििववववकककक4444पप पप :::: 12वd एवं 13वd योजना अविध के िलए अब उपल(cid:4)ध .ो़!ोिगकV िवक(cid:18)प िनDन िलिखत ह।g इन िवक(cid:18)प ^ को िविशJठ सम,य ाk के समाधान के िलए .योग करना उिचत होगा, इसका आशय यह ह ै 7क 7कसी िवशेष कार(वाई के िलए केवल सीिमत संmय ा म(cid:19) ही िवकल्प उपयु(cid:25)त हो सकत े ह g । (cid:3) 220 के.वी. ए.सी., 400 के.वी. ए.सी, 765 के.वी. ए.सी, 1200 के.वी. ए.सी (cid:3) एच.वी.डी.सी./यू.एच.वी.डी.सी. ( +500 के.वी., +600 के.वी., +800 के.वी.) (cid:3) हाइिRड मॉडल (एच.वी.डी.सी िस,ट म सिहत ए.सी.) (cid:3) उ>च सुचालक तापमान िवक(cid:18)प के साथ उ>च 8मतायु(cid:25)त लाइऩ(cid:19) (cid:3) िस(cid:10)रज कंपे3सेशन, डायनिमक (cid:10)रऐि(cid:25)टव पॉवर-टी.सी.एस.सी., एस.वी.सी., ,ट ैटकॉम/फै(cid:25)X स **********502 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] – अअअअ(cid:2)(cid:2)(cid:2)(cid:2)यय यय ाााायययय 5555 ननननईईईई (cid:6)(cid:6)(cid:6)(cid:6)ौौौौ ़़ ़़ ोोोोििििगगगगकककक"""" ततततथथथथाााा (cid:7)(cid:7)(cid:7)(cid:7)मम मम ााााटटटट%%%% िििि&&&&डडडड 5555....1111 रररराााा(cid:16)(cid:16)(cid:16)(cid:16)(cid:17)(cid:17) (cid:17)(cid:17) ीीीीयययय िििि1111डडडड ककककेेेे ििििडडडडजजजजााााइइइइनननन एएएएवववव ंं ंंइइइइससससककककेेेे (cid:30)(cid:30)(cid:30)(cid:30)चचचचााााललललनननन मममम (cid:27)(cid:27) (cid:27)(cid:27)चचचचननुुननुु ौौौौििििततततययययाााा--ँँ--ँँ िविभ3न 8े9^ कV बढ़ती िव!ुत मांग को पूरा करने के िलए िSड कV िव!ुत अंतरण 8मता म(cid:19) िनरंतर संवध(न अपेि8त ह।ै इसके िव,त ार म(cid:19) कुछ चुनौितयL ह,g िजनका आयोजना एवं नई .ा़!ोिगकV अपनाए जाने स े समाधान िनकलता ह।ै कुछ चुनौितयL िनDन िलिखत ह g :- (cid:2) ममममाााागगगगाााािि!!िि!! धधधधककककाााारररर ((((ररररााााइइइइटटटट ऑऑऑऑफफफफ ववववेे))े)े) : वत(मान समय म(cid:19) पारेषण 8े9 कV यह सबसे मुmय सम,य ा ह।ै पया(वरण िहत को cय ान म(cid:19) रखते aए उ>च 8मता वाले पारेषण माग( (मेगावाट .ित मीटर राइट आफ वे) को िवकिसत करन े कV आवiय कता ह।ै (cid:2) उउउउपपपपककककेेेे5555CC CC ललललगगगगाााानननन ेे ेे हहहहततततेेेे ुु ुु जजजजगगगगहहहह ककककाााा अअअअभभभभाााावववव :::: महानगर^, पव(तीय तथा अ3य शहरी 89े ^ म(cid:19) जगह कV उपल(cid:4)ध ता न होने स े वहाँ उपके34 ^ लगाने के िलए ,थ ान सीिमत करने कV .बल आवiय कता ह।ै (cid:2) पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन पपपपरररर ििििवववव(cid:20)(cid:20)(cid:20)(cid:20)ततततुुुु ललललोोोो9999डडडडगगगग ततततथथथथाााा ििििवववव(cid:20)(cid:20)(cid:20)(cid:20)ततुुततुु ििििननननययययममममनननन ((((ररररेेेेगगगगललुुललुु ेशेशेशेशनननन)))) मममम (cid:27)(cid:27) (cid:27)(cid:27)ससससKKKKििििललललययययतततत :::: दिै नक खपत के साथ-साथ खास मौसम म(cid:19) िव!ुत मांग म(cid:19) भारी अंतर के कारण िSड कV सुर8ा एव ं इसके इJट तम उपयोग हते ु पारेषण नेटवक( पर िव!तु .वाह को िनयंि9त करने कV अ&य ंत आवiय कता होती ह।ै (cid:2) (cid:30)(cid:30)(cid:30)(cid:30)चचचचााााललललनननन ससससबबंंबबंं धधंंधधंं ीीीी दददद(cid:7)(cid:7)(cid:7)(cid:7)तततताााा मममम (cid:27)(cid:27) (cid:27)(cid:27)ससससधधुुधधुु ाााारररर – िव!ुत .णाली को सरु 8ा, संर8ा तथा अिधकािधक उपल(cid:4)ध ता के साथ-साथ उ>च 8मता स े .चािलत 7कया जाना अपेि8त ह।ै यह तभी संभव हो सकता ह ै जब िवiव सनीयता आधा(cid:10)रत ऑन- लाइन मािनटHरग कV जाए, पहले ही मरDम त एवं अनुर8ण और फोस( आउटेज को शू3य 7कया जाए। 5555....2222 ननननईईईई (cid:30)(cid:30)(cid:30)(cid:30)ाााा(cid:20)(cid:20)(cid:20)(cid:20)ोोोोििििगगगगकककक.... ककककाााा अअअअगगंंगगंं ीीीीककककररररणणणण उपरो(cid:25)त चुनौितय^ से िनपटने के िलए िनDन िलिखत .ौ!ोिगकV का 7)या3व यन 7कया जा रहा ह।ै (cid:2) पपपपााााररररेेेेषषषषणणणण ववववोोोो4444टट टट ेेजजेेजज मममम (cid:27)(cid:27) (cid:27)(cid:27)ववववििृृििृृ BBBB : वो(cid:18)ट ेज बढ़ने से िविभ3न ,त र^ पर िव!ुत घन&व म (cid:19) वृिh होती ह।ै यह 132 7क.वा. हते ु 3 मेगावाट/मीटर तथा 765 7क.वा. हते ु 45 मेगावाट/मीटर होता ह।ै 765 7क.वा. ,त र तक वो(cid:18)ट ेज का पारेषण पहले से ही 7कया जा रहा ह।ै ऐसी ही एक ±800 7क.वा., 6000 मेगावाट एच.वी.डी.सी. .णाली, जो पूव=&त र 8े9 (एन.ई.आर.) से 2000 7कमी. दरू उ&त री 8े9 (एन.ई.) के थोक िव!ुत िनJक ष(ण का एक अंग ह,ै पर काय( चल रहा ह।ै इसके अित(cid:10)र(cid:25)त ए.सी. वो(cid:18)ट ेज 1200 7कलोवाट तक बढ़ाने कV योजना बनाई गई ह।ै 1000 7क.वा. के एच.वी.डी.सी. .णाली के िलए अनुसंधान काय( भी आरंभ 7कया जा चुका ह।ै (cid:2) पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन ककककाााा अअअअपपपप1111डडेेडडेे ेशेशेशेशनननन :::: जDम ू-कiम ीर म(cid:19) 7कशेनपुर-7कiत वार लाइन के 220 7कलोवाट डी/सी. को 400 7कलोवाट एस/सी. म (cid:19) अपSेड 7कया गया, जो भारत म(cid:19) पहली बार aआ ह।ै इससे वत(मान पारेषण माग( (कॉ(cid:10)रडोर) के मागा(िधकार (राइट आफॅ वे) म(cid:19) िव!ुत अंतरण 8मता म(cid:19) मामूली (35 मीटर से 37 मीटर) वृिh aई ह।ै (cid:2) ± एएएएचचचच....ववववीीीी....डडडडीीीी....ससससीीीी.... टटटटXXXXममममननननलललल ककककाााा अअअअपपपप1111ेडेडेडेडशशेेशशेे नननन :::: तलचर (पूव=&त र 8े9) – कोलर (दि8ण 8े9) 500 7कलोवाट एच.वी.डी.सी. टtमनल के 2000 से 2500 मेगावाट म(cid:19) अपSेडेशन का काय( िबना 7कसी अड़चन और 7कसी उपकरण बदले ही पूरा कर िलया गया ह।ै इससे िब(cid:18)क ुल अ(cid:18)प लागत पर (cid:26)ांसफारमर कV कूGलग म(cid:19) वृिh aई ह ै और (cid:10)रए(cid:25)ट र को िनबा(ध करने म(cid:19) सहायता िमली ह।ै¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 503 (cid:2) 444400000000 VVVVककककललललोोोोववववााााटटटट उउउउRRRRचच चच (cid:7)(cid:7)(cid:7)(cid:7)ममममतततताााा कककक.... मममम4444टट टट ीीीी ससससYYYYककककटटटट////बबबबडडंंडडंं लललल ककककंंंंडडडड::::टट टट रररर ललललााााइइइइनननन (cid:27)(cid:27) (cid:27)(cid:27) :::: पावर िSड ने म(cid:18)ट ी स6कट टावर^ (एक टावर पर दो कंड(cid:25)ट र सिहत 4 स6कट) का इन-हाउस िडजाइन एवं िवकास 7कया ह,ै िजनका कई पारेषण .णािलय^ म(cid:19) उपयोग 7कया जा रहा ह ै और ये जंगल एवं सघन मागा(िधकार (राइट ऑफ वे) वाले 8े9^ जैसे कुडानकुलम और आर.ए.पी.पी.-सी पारेषण .णाली से होकर गुजरत े ह।g (cid:2) हहहहााााईईईई ससससजजजज !! !! इइइइZZZZपप पप डडेेडडेे 55ेे55ेे सस सस ललललोोोो9999डडडडगगगग ललललााााइइइइनननन ((((एएएएचचचच....एएएएसससस....आआआआईईईई....एएएएलललल....)))) : पारेषण लाइन^ कV लोड 8मता को बढ़ान े के िलए एच.एस.आई एल. .ौ!ोिगकV िवकास को बढ़ावा 7दया जा रहा ह।ै पावर िSड एक एच.एस.आई एल. यथा-400 7कलोवाट मेरठ-कैथाल डी/सी लाइन को तैयार कर रहा ह,ै जो 7कसी नाम(ल (cid:25)व ाड बंडल कंडक्ट र लाइन हते ु नॉिमनल 650 मेगावाट कV तुलना म (cid:19) एस.आई.एल. 750 मेगावाट का ह।ै (cid:2) ककककZZZZपप पप ::ैै::ैै टट टट टटटटााााववववरररर :::: ड(cid:18)े ट ा कन7फगरेशन कV तरह कDप ै(cid:25)ट टावर का आकार छोटा/पतला होता ह ै और कम ,थ ान घेरने के कारण इन टावर^ का .योग 7कया जा रहा ह।ै ड(cid:18)े ट ा कन7फगरेशन पर पहली टावर लाइन - 765 7कलोवाट िसपत–िसवनी 2xएस./सी. .7)याधीन ह।ै इसके अलावा घनी आबादी वाल े 8े9^ म(cid:19) 400 7कलोवाट के टावर^ का उपयोग 7कया जा रहा ह।ै घनी आबादी वाले शहरी 8े9^ म (cid:19) मागा(िधकार (राइट ऑफ वे) कV सम,य ा के समाधान के िलए महारानी बाग, 7द(cid:18)ल ी उपके34 आन े वाली पारेषण लाइन हते ु परंपरागत टावर^ कV आधारभूत चौडा़ई 12 से 15 मीटर के ,थ ान पर लगभग 1.85 मीटर चौड़ाई के खंभ^ के आकार के टावर^ का उपयोग 7कया गया। (cid:2) उउउउRRRRचच चच तततताााापपपपममममाााानननन पपपपरररर ललललोोोो ससससगगैैगगैै ((((एएएएचचचच....टटटटीीीी....एएएएलललल....एएएएसससस....)))) ककककंंंंडडडड::::टट टट रररर ललललााााइइइइनननन :::: वत(मान रेHटग को बढ़ान े के िलए उ>च तापमान अवशोिषत करन े वाल े कंड(cid:25)ट र^ का .योग चयिनत .ारेषण माग{ (कॉ(cid:10)रडोर) तथा शहर^/महानगर^ म(cid:19) 7कया जा रहा ह।ै पावर िSड ने महारानी बाग उपके34 पर 400 7कलोवाट दादरी-ब(cid:18)ल भगढ़ (cid:25)व ाड कंड(cid:25)ट र लाइन के एलआईएलओ िह,स े (15 7कमी. के िव,त ार) हते ु दोन^ आईएनवीएआर कंड(cid:25)ट र लाइन को पहल े ही 7)याि3वत 7कया ह।ै इसके अलावा िसिलगुड़ी-पूtणयां के दोन^ मूज कंड(cid:25)ट र लाइन^ को उ>च तापमान लो सैग कंड(cid:25)ट र (एच.टी.एल.एस.) से (cid:10)र-कंड(cid:25)ट र 7कया जा रहा ह।ै (cid:2) गगगगससैैससैै इइइइ5555सस सस ललुुललुु टटेेटटेे ेेडडेेडड उउउउपपपपककककेेेे5555CC CC ((((जजजजीीीी....आआआआईईईई....एएएएसससस....)))):::: पारेषण .णाली ,थ ािपत करन े हते ु महानगर^, पव(तीय, तथा नगरीय 8े9^ म(cid:19) जमीन कV िवशेषWप से अनुपल(cid:4)ध ता के कारण जमीन कV कम खपत 7कए जाने कV बराबर आवiय कता रही ह।ै गैस इ3स ुलेटेड उपके34 (जी.आई.एस.) हते ु (करीब 70 .ितशत) कम जगह कV आवiय कता होती ह।ै परंपरागत िव!ुत उपके34 हते ु सामा3य तया 30 से 40 एकड़ 8े9फल कV तुलना म(cid:19) इसके िलए केवल 8 से 10 एकड़ 8े9फल कV जWरत होती ह।ै जमीन कV आवiय कता को पूरा करन े हते ु िमतsय यता के दिृ lकोण से गैस इ3स ुलेटेड उपके34 (जी.आई.एस.) का .योग एक बेहतर िवक(cid:18)प ह।ै (cid:2) ििििवववव(cid:20)(cid:20)(cid:20)(cid:20)ततुुततुु (cid:30)(cid:30)(cid:30)(cid:30)ववववााााहहहह मममम (cid:27)(cid:27) (cid:27)(cid:27) ििििननननयययय33ंं33ंं णणणण////ससससससंंससंं ााााधधधधनननन,,,, ककककाााा उउउउपपपपययययोोोोगगगग :::: िव!तु कV बढ़ती मांग के कारण वत(मान संसाधन^ के समुिचत उपयोग के साथ-साथ िव!ुत िनयं9ण पर अिधका िधक cय ान 7दए जाने कV आवiय कता महसूस कV जा रही ह।ै िव!ुत नेटवक( पर इले(cid:25)(cid:26) ािन(cid:25)स उपकरण^ के .योग स े ही ऐसा संभव हो सकता ह।ै (cid:2) िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथिििितततत आआआआधधधधाााा((((ररररतततत ममममॉॉॉॉििििननननटटटट\\\\ररररगगगग :::: पावर िSड ने (cid:26)ांसफारमर^ कV बेहतर िवiव सनीयता, उपल(cid:4)ध ता तथा (cid:10)टकाऊपन के िलए डी.जी.ए. एफ.आर.ए., पी.डी.सी., आर.वी.एम. आ7द, सी.बी. के िलए डी.सी.आर.एम. एवं सज( ऐरे,ट र^ आ7द के िलए थड ( हाम=िनक (cid:10)रिसि,टव करंट मेजरम(cid:19)ट जैसी अनेक दशा मॉिनटHरग एवं डायPन ोि,टक कV उ&क ृJट तकनीक^ को अपनाया ह।ै इसके अलावा (cid:26)ा3स फारमर^ के ऑन-लाइन मािनटHरग कV .णाली504 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] को 7)याि3वत 7कया जा रहा ह ै ता7क आरंिभक ,त र पर ही गड़बड़ी का पता लगाया जा सके तथा (cid:26)ा3स फारमर^ के खराब होन े के पहले ही चौक3न ा 7कया जा सके। (cid:2) ििििननननववववााााररररकककक अअअअननननररुुररुु (cid:7)(cid:7)(cid:7)(cid:7)णणणण : (cid:26)ा3स फारमर^ तथा (cid:10)रए(cid:25)ट र^ के िविभ3न पुज@, स6कट Rेकर^, इ3, ‰ म(cid:19)ट (cid:26)ा3स फारमर^, लाइट ऐरे,ट र आ7द िविभ3न कंपोने3ट कV ऑन-लाइन मािनटHरग म(cid:19) िविभ3न उपकरण^ हते ु उ&क ृJट िनवारक अनुर8ण तकनीक^ को .णाली म(cid:19) शािमल 7कया गया ह।ै (cid:2) पपपपााााररररेेेेषषषषणणणण पपपप((((ररररययययोोोोजजजजननननााााUUUU हहहहततेेततेे ुुुुधधधधाााा((((ररररतततत अअअअववववििििधधधध मममम (cid:27)(cid:27)(cid:27)(cid:27)ककककममममीीीी :::: उ&प ादन प(cid:10)रयोजनाk कV धा(cid:10)रत अविध म(cid:19) कमी तथा राJ(cid:26) ीय िव!तु आयोजना से sय ित)म होन े कV सभं ावना एवं नॉन िडि,) िमनेटरी ओपेन ए(cid:25)स ेस (cid:10)रजीम को cय ान म(cid:19) रखते aए पारेषण योजनाk हते ु धा(cid:10)रत अविध को समुिचत Wप से सीिमित 7कया जाना होगा। पारेषण प(cid:10)रयोजनाk कV धा(cid:10)रत अविध को सीिमत 7कए जाने हते ु नई िनमा(ण .णाली एवं .ा!ोिगकV कV उपल(cid:4)ध ता को 7)याि3वत 7कया जाना अपेि8त होगा। िडटेल सव@ तथा Wट एलाइनम(cid:19)ट के िलए सैटेलाइट इमेGजग जैसी उभरती .ो!ोिगकV को अपनाना वांछनीय होगा। िविभ3न .कार के टावर^ कV िव3ड जोन मैGपग तथा मानक िडजाइन और मृदा जLच अिSम Wप से कV जा सकती ह ै ता7क पारेषण .णाली के िलए िनमा(ण समय को काफV हद तक कम 7कया जा सके। 5555....3333 (cid:12)(cid:12)(cid:12)(cid:12)मम मम ााााटटटट!! !! ननननशशेेशशेे ननननलललल िििि1111डडडड 5555....3333....1111 भभभभााााररररततततीीीीयययय ििििवववव(cid:20)(cid:20)(cid:20)(cid:20)ततततुुुु (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी हहहहततेेततेे ुु ुु(cid:12)(cid:12)(cid:12)(cid:12)मम मम ााााटट!!टट!! (cid:17)(cid:17)(cid:17)(cid:17)ााााससंंससंं ििििममममशशशशनननन िििि1111डडडड कककक.... आआआआववववIIIIयय यय ककककतततताााा िव!ुत 8े9 कV पुन: संरचना ((cid:10)र(cid:25)(cid:26) (cid:25)च Hरग) तथा उदारीकरण के कारण नए िनयमन, उ3म ु(cid:25)त पaचँ , िव!ुत लने -दने इ&य ा7द एवं कम अविध के काय{ कV बढ़ती भागीदारी और नवीनीकरण योPय उ&प ादन के कारण भारतीय िSड को ,म ाट( नेशनल िSड के Wप म(cid:19) िडजाइन और संचािलत 7कया जाना आवiय क हो गया ह।ै िव!ुत कV बढ़ती मागं को पूरा करने म(cid:19) भारतीय िव!ुत .णाली का तीŠ गित से िव, तार हो रहा ह।ै अिनयत िव!तु िवतरण के अिधकतम उपयोग हते ु अंतरा(2य ीय/8े9ीय .णाली के माcय म स े 8े9ीय िSड^ का िनरंतर सशि‚करण 7कया जा रहा ह।ै पांच 8े9ीय िSड^ म(cid:19) चार िSड यथा- उ&त री, पिZमी, पूवC तथा पूव=&त र, िजनकV 8मता करीब 133 गेगावाट ह,ै को एक दसू रे के तु(cid:18)य कािलक (Gस)ोनाइज) बनाया गया ह,ै जब7क दि8णी िSड (49 गेगावाट) को 2014 तक इन िSड^ के तु(cid:18)य कािलक 7कए जान े कV आशा ह।ै अगले 5 से 6 वष{ म(cid:19) करीब 40 से 50 गेगावाट नवीनीकरण योPय उ&प ादन सिहत भारत के सभी िSड^ कV एकVकृत उ&प ादन 8मता 300 गेगावाट तक पaचँ ने कV आशा ह।ै sय ापक नवीनीकरण योPय 8मता के मुmय घटक के Wप म(cid:19) पवन िव!ुत उ&प ादन कV .कृित सामा3य ता अिनयिमत ह ै और िSड के साथ इसके एकVकरण से इतने बड़ े िSड हते ु मािनटHरग और िनयं9ण म(cid:19) ज(cid:10)टलता आएगी। लंबी दरू ी तक फैले िSड तथा इसके .चालन म(cid:19) बढ़ती ज(cid:10)टलता और िव!ुत खपत के कारण sय ापक ,त र पर इस े मॉिनटर करन े कV आवiय कता होती ह,ै जो उभती aई Gस)ो फेजर .ौ!ोिगकV के .योग से केवल संभव हो सकती ह।ै िSड के काय ( िनJप ादन हते ु sय ापक 8े9 मापन .णाली (डब (cid:18)् य एएमएस) आधा(cid:10)रत .ौ!ोिगकV सबसे मह&व पूण( ह,ै जो इस आधुिनक प(cid:10)रदiृ य म(cid:19) िSड के िलए अपेि8त भी ह।ै sय ापक 8े9 मापन .णाली (वैDस ) हते ु उपके34 ^ तथा िव!ुत उ&प ादन संयं9^ पर फेजर मापन यूिनट (पी.एम.यू.) लगाया जाना अपेि8त ह।ै वत(मान एस.सी.ए.डी.ए. /ई.एम.एस. आधा(cid:10)रत िSड .चालन म (cid:19) पावर िSड के केवल ,थ ाई दशा को sय (cid:25)त 7कए जाने कV 8मता होती ह।ै sय ापक 8े9 हते ु Gस)ोफैजर मापन सिहत फेजर मापन यूिनट (पी.एम.यू.), पर आधा(cid:10)रत .ौ!ोिगकV, डायनिमक (cid:10)रयल टाइम मेजरम(cid:19)ट और पावर िस,ट म िवजुएलाइजेशन को आसान बनाती ह,ै जो िSड कV संर8ा एवं सुर8ा कV मॉिनटर करने के साथ-साथ िनयं9ण और िनवारक काय{ हते ु उपयोगी ह।ै ,म ाट( िSड के सफल िवकास म (cid:19) sय ापक 8े9 मापन .णाली (वैDस ) म(cid:19) संवध(न के साथ-साथ मापन, संचार, िनयं9ण एवं ,व चालन (कं(cid:26)ोल एवं आटोमेशन) उ33 त शील मीटर, सूचना .ौ!ोिगकV कV आधा(cid:10)रक संरचना, ऊजा( भडं ारण आ7द मह&व पूण( भूिमका अदा करत े ह।g¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 505 5555....3333....2222 फफफफैैैैजजजजरररर ममममाााापपपपनननन ययययििूूििूू ननननटटटट ((((पपपपीीीी....एएएएमममम....यययय..ूू..ूू )))) ततततथथथथाााा LLLLयय यय ाााापपपपकककक (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ममममाााापपपपनननन (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी ((((ववववZZैैZZैै सस सस )))) (cid:30)(cid:30)(cid:30)(cid:30)ौौौौ(cid:20)(cid:20)(cid:20)(cid:20)ोोोोििििगगगगVVVVककककयययय,,,, ककककेेेे ििििववववषषषषयययय मममम (cid:27)(cid:27)(cid:27)(cid:27) जजजजााााननननककककााााररररीीीी फफफफेेेेजजजजरररर औऔऔऔरररर 9999सससस>>>>ोोोोफफफफेेेेजजजजरररर (cid:30)(cid:30)(cid:30)(cid:30)ौौौौ(cid:20)(cid:20)(cid:20)(cid:20)ोोोोििििगगगगकककक.... :::: फैजर एक ज(cid:10)टल संmय ा ह,ै जो ए.सी. .णाली म(cid:19) पाई जाने वाली 2य ा तरंग^ (साइन वेब) के मै‹ीŒूड तथा फेज एगं ल दोन^ का .ितिनिध&व करती ह।ै उसी समय होन े वाले फैजर मापन को Gस)ोफैजर कहते ह,g िज3ह (cid:19) फैजर मापन यूिनट (पी.एम.यू.) uारा पूरी शुhता के साथ मापा जा सकता ह।ै पारंप(cid:10)रक .ौ!ोिगकV से 4 स े 10 सेक(cid:19)ड कV ,प ीड कV तुलना म(cid:19) फैजर मापन यूिनट (पी.एम.यू.) uारा मापन काय( िवशेषWप से .ित सेक(cid:19)ड 25 स े 30 सgपल कV उ>च ,प ीड पर िलया जाता ह।ै कॉमन टाइम रेफरे3स के अनुसार .&य ेक मापन, टाइम ,ट ैDप ीड होता ह।ै टाइम ,ट gGपग, Gस)ोफैजर को िविभ3न ,थ ान^ से टाइम एलाइन (Gस)ोनाइज) होने दते ा ह,ै िजससे संपूण( िSड का संयु(cid:25)त एवं sय ापक दiृ य उपल(cid:4)ध हो पाता ह।ै sय ापक 8े9 मापन .णाली (वैDस ) नेटवक( के एक अंग के Wप म(cid:19) 7कसी िविशJट पी.एम.यू. अिधJठ ापन (इ3स टालेशन) म(cid:19) ऐसे पी.एम.यू. आते ह,g जो िSड के िविवध उoiे य ^ कV .ािr म(cid:19) सम,त िव!ुत िSड^ तक दरू -दरू ि,थत होते ह।g मुmय के34 का फैजर डाटा कंसे3(cid:26) ैटर (पी.डी.सी.) पी.एम.यू. से आंकड़ े जुटाता ह ै और इसे टाइम एलाइन करते aए सुपरवाइजरी कं(cid:26)ोल एवं डाटा ए7(cid:141)िजशन (एस.सी.ए.डी.ए.) िस,ट म को भेजता ह।ै वैDस नेटवक( को पी.एम.यू. डाटा के सgपGलग 7Ž(cid:25)व gसी का िमलान करके &व (cid:10)रत गित स े डाटा अंत(cid:10)रत करने हते ु हाई बgडिव(cid:143)थ कDय ूिनकेशन बैकबोन कV आवiय कता होती ह।ै फफफफैैैैजजजजरररर डडडडााााटटटटाााा ककककंंंंसससस55ेे55ेे (cid:17)(cid:17) (cid:17)(cid:17) ेेटटेेटटरररर ((((पपपपीीीी....डडडडीीीी....ससससीीीी....)))) :::: कई पी.एम.यू. से मापे गए िव!ुत पैरामीटर^ को िजस उपकरण के माcय म से ,थ ािनक अथवा दरू ,थ संSिहत 7कया जाना होता ह,ै उसे फैजर डाटा कंसे3(cid:26) ेटर (पी.डी.सी.) कहत े ह।g जहL फैजर डाटा, कई पी.एम.यू. से 7कसी .णाली के िलए आंकड़ (cid:19) संSिहत, सह-संबh करके एव ं एकल ,(cid:26) ीम से अ3य अनु.योग^ (एि*लकेशन^) के िलए उनकV पूtत करता ह,ै वहL फैजर डाटा कंसे3(cid:26) ेटर (पी.डी.सी.) नोड बनाता ह।ै सोपािनक ढ़ांचे म(cid:19) कई डाउन ,(cid:26) ीम पी.डी.सी. से आंकड़ े इक(cid:144)ा करने म(cid:19) भी फैजर डाटा कंसे3(cid:26) ेटर (पी.डी.सी.) का .योग 7कया जा सकता ह।ै फैजर डाटा कंस3े (cid:26) ेटर (पी.डी.सी.), फैजर डाटा पर गुणव&त ा कV जLच, सह-संबh डाटा ,(cid:26) ीम पर आवiय क Bलैग लगाने, िड,ट रबgस Bलैग को चेक करने तथा िवiल ेषण हते ु डाटा फाइल^ को (cid:10)रकाड ( करने, समS मापन .णाली को मािनटर करने तथा काय( िनJप ादन के (cid:10)रकाड ( एव ं .दtशत करने जसै े अित(cid:10)र(cid:25)त काय{ को भी संपा7दत करता ह।ै LLLLयय यय ाााापपपपकककक (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ममममाााापपपपनननन (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी ((((ववववZZैैZZैै सस सस )))) :::: फैजर मापन यूिनट (पी.एम.यू.) से यु(cid:25)त sय ापक 8े9 मापन .णाली (वैDस ) उभरती aई .ौ!ोिगकV ह,ै जो एक उ3न तशील मापन .णाली ह।ै वैDस बड़ी त&प रता स े तु(cid:18)य कािलक (Gस)ोनाइ2ड ) मापन करता ह।ै sय ापक 8े9 मापन .णाली (वैDस ) .ौ!ोिगकV, ऐिD*लीŒडू और फेज एगं ल के Wप म(cid:19) (cid:10)रयल टाइम फैजर दते ा ह,ै जो अिधक ,प Jट िवजुएलाइजन तथा िव!ुत .णाली .चालन कV प(cid:10)रि,थित से बेहतर अवगत कराने म(cid:19) स‘िलयत दते ी ह।ै पारेषण .णाली म(cid:19) िSड को ,म ाट( बनाने हते ु वैDस .ौ!ोिगकV मुmय भूिमका िनभाती ह।ै वैDस .णाली के अंतग(त फैजर मापन यूिनट (पी.एम.यू.) फैजर डाटा कंसे3(cid:26) ेटर (पी.सी.डी.), िवजुएलाइजेशन ऐड, एि*लकेशन एवं एनािलिसस माYूल, डाटा आtचGवग तथा ,ट ोरेज आ7द कंपोने3ट आते ह।g वैDस .ौ!ोिगकV के मूलभूत घटक^ म (cid:19) पी.एम.यू., वाइड बgड कDय ूिनकेशन तथा पी.डी.सी. आते ह।g कई दशे ^ म(cid:19) पी.एम.यू. का अिधJठ ापन (इन,ट ालेशन) सबसे पहले केवल इस .ौ!ोिगकV के अनुभव स े प(cid:10)रिचत होने के िलए आरंभ 7कया गया तथा अिधJठ ािपत इन पी.एम.यू. को sय ापक ,त र पर 7)याि3वत करते aए बाद म(cid:19) इ3ह (cid:19) एकVकृत 7कया गया। पूरे िवiव म(cid:19) वैDस .ौ!ोिगकV के सवा(िधक काय()म^ म(cid:19) फैजर .ौ!ोिगकV को लागू 7कए जाने के तीन चरण ह।g इसके .थम चरण म(cid:19) संि,थित िवƒान (टोपोलॉजी) तथा .चालन सीमा के िनधा(रण हते ु पी.एम.यू. का उपयोग कर रह े सम,त िSड के मह&व पूण( ,थ ल^ से आtचव फैजर तथ ा 7Ž(cid:25) वgसी डाटा का संSह ह।ै इसके िuतीय चरण म(cid:19) िSड .चालन को ि,थर और िवiव सनीय बनाने म(cid:19) सुझाव हते ु िवiल ेषणा&म क .7)या से िSड कV दशा कV गणना के िलए (cid:10)रयल टाइम फैजर तथा 7Ž(cid:25) वै3स ी मापन के506 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] साथ संSिहत आंकड़^ का उपयोग ह।ै तृतीय और अंितम चरण म(cid:19) उपरोक् त सम ,त काय ( िबना 7कसी sय ि‚ के ऑटोमg(cid:10)टक संप3न 7कया जाना होता ह।ै 5555....3333....3333 पपपपररूूररूू ेेेे ििििववववIIIIवव वव मममम (cid:27)(cid:27) (cid:27)(cid:27)9999सससस>>>>ोोोोफफफफेेेेजजजजरररर ककककाााा अअअअनननन(cid:30)(cid:30)ुु(cid:30)(cid:30)ुु ययययोोोोगगगग उ&त री अमे(cid:10)रका, यूरोप, चीन, Wस, Rाजील आ7द दशे ^ सिहत िवiव भर म(cid:19) अनके िव!ुत कंपिनय^ ने बड़ े िव!ुत िSड^ के .चालन स े लाभाि3वत होन े के िलए इस नई .ौ!ोिगकV का उपयोग/िवकास करना आरंभ कर 7दया ह।ै चीन ने sय ापक 8े9 मािनटHरग .णाली (वैDस ) के अंतग(त वष( 2006 म(cid:19) अपने 6 िSड^ िवशेषकर 500 7कलोवाट एवं 330 7कलोवाट उपके34 ^ तथा िव!तु संयं9 हते ु 300 फैजर मापन यूिनट (पी.एम.यू.) अिधJ ठािपत कराया। वत(मान म(cid:19) चीन ने अपने िSड^ म(cid:19) 1000 फैजर मापन यूिनट (पी.एम.यू.) से अिधक को अिधJठ ािपत कराया ह ै और सभी 500 7कलोवाट उपके34 ^ एवं 300 मेगावाट तथा इसके अिधक 8मता के िव!ुत संयं9^ म(cid:19) फैजर मापन यूिनट (पी.एम.यू.) लगाने कV योजना बनाई ह।ै अमे(cid:10)रका म(cid:19) 57 िव!तु कंपिनय^ और िSड .चालक^ को शािमल करते aए 10 Gस)ोफेजर प(cid:10)रयोजनाk पर 7)या3व यन हो रहा ह ै तथा लगभग 850 फैजर मापन यूिनट (पी.एम.यू.) नेटवक( पर इसका अिधJठ ापन 7कया जा चुका ह।ै ये युि‚यL वष( 2013 तक दशे के लगभग सभी 8े9^ म(cid:19) काय( करने लग(cid:19)गी। पूवC इंटरकने(cid:25)ट फैजर प(cid:10)रयोजना (ई.आई.पी.पी.), िजसे अब नाथ ( अमे(cid:10)रकन Gस)ोफेजर इिनिशए(cid:10)टव अथवा एन.ए.एस.पी.आई. कहा जाता ह,ै uारा टेनसी वैली .ािधकरण (टी.वी.ए.) ि,थत ''सुपर फैजर डाटा कने(cid:25)(cid:26) ैटर’’ .णाली म(cid:19) आंकड़^ को संSिहत करते aए 40 से अिधक फैजर मापन .णाली यूिनट^ को जोड़ा गया ह।ै दि8णी कैिलफोtनयL एिडसन अपनी .णाली पर कुछ ,व चािलत िSड^ के संर8ण हते ु अब Gस)ोफैजर .ौ!ोिगकV का सफलतापूव(क उपयोग कर रहा ह।ै अमे(cid:10)रका कV ओखलाहोमा गैस एवं िव!तु कंपनी (ओ.जी. एडं ई.), Gस)ोफैजर .ौ!ोिगकV का उपयोग यह िनधा(रण करने के िलए करती ह ै 7क (cid:25)य ा कोई Wकावट उ>च गित अथवा ,ट ेप-िड,ट gस (िडलेड) (cid:10)(cid:26)Gपग uारा दरू होती ह।ै इन आंकड़^ का .योग Wकावट के कारण^ का पता लगाने तथा उसकV जLच हते ु 7कया जाता ह।ै Gस)ोफैजर आंकड़ो का दसू रा बड़ा मह&व पूण( उपयोग उपकरण^ म(cid:19) आ रह े दोष, िजनका 7क एस.सी.ए.डी.ए. .णाली से ƒात नहd हो पाता, को िनधा((cid:10)रत करन े म(cid:19) भी 7कया जाता ह।ै .णाली ि,थरता का म(cid:18)ू य ाकं न, उ&पादन िनय9ं ण म (cid:19) सम,य ा अथवा अ3य कारण^ स े लो 7Ž(cid:25)व 3ै स ी ओि,लेशन जैसी 7कसी अंत:संबh .णाली कV ज(cid:10)टलताk का िवशेष Wप स े पता लगाने के िलए Gस)ोफैजर आंकड^ का .योग .योग 7कया जा रहा ह।ै उपरो(cid:25)त राJ(cid:26) ^ के अित(cid:10)र‚, दि8ण अ7Žका, Rाजील, Wस, पिZमी िव!ुत सम3व य प(cid:10)रषद (ड(cid:4)(cid:18) य ू. ई.सी.सी.), िजसका सेवा 89े कनाड़ा से मैि(cid:25)सको तथा कुछ यरू ोपीय दशे ^ तक फैला aआ ह,ै अपनी .णाली म(cid:19) पी.एम.यू. लगाने कV योजना बना रह े ह।g 5555....3333....4444 भभभभााााररररतततत मममम (cid:27)(cid:27) (cid:27)(cid:27)ममममौौौौजजजजददूूददूू ाााा पपपपीीीीएएएएममममयययय ूू ूूपपपप((((ररररययययोोोोजजजजननननाााा एएएएवववव ंं ंंइइइइससससककककाााा ललललााााभभभभ भारत म(cid:19) पी.एम.यू. ,थ ािपत करने कV .7)या पहले ही शुW कV जा चुकV ह।ै उ&त री 8े9 म(cid:19) पहले चरण म(cid:19) 9 पी.एम.यू.-मोगा, कानपुर, ददरी, िव3c य ाचल तथा दसू रे चरण म(cid:19) आगरा, ब,स ी, िहसार, 7कशेनपरु तथा करचम वांगटू म(cid:19) लगाए जा चुके ह,g िजनका फैजर डाटा कंसे3(cid:26) ेटर (पी.डी.सी.) एन.आर.एल.डी.सी. म(cid:19) ह।ै .&य ेक पी.एम.यू. पर फैजर डाटा, जी.पी.एस. टाइम ,ट ैGपग सिहत .ित सेक(cid:19)ड 25 सgपल लेता ह,ै जो 64 के.बी.पी.एस. फाइबर ऑि*टक कDय ूिनकेशन Gलक से एन.आर.एल.डी.सी. को फैजर डाटा कंसं3(cid:26) ेटर (पी.डी.सी.) अंत(cid:10)रत करता ह।ै इन ,थ ान^ से .ा*त फैजर डाटा को एक म(cid:19) िमलाते aए इसका पी.डी.सी. टाइम एलाइन करते ह।g पी.डी.सी. टाइम एलाइन 7कए aए डाटा िवजुएलाइजेशन के िलए ऑपरेटर क3स ोल को उपल(cid:4)ध कराए जाते ह।g पी.डी.सी. डाटा एन.आर.एल.डी.सी. के डाटा िह,ट ो(cid:10)रयन को भी उपल(cid:4)ध कराये जात े ह।g िह,ट ो(cid:10)रयन से डाटा को ओपेन डाटाबेस कनेि(cid:25)टिवटी (ओ.डी.बी.सी.) तथा भिवJय म(cid:19) िवiल ेषण के िलए ,. ेडशीट uारा बाहरी डाटाबेस के िलए उपल(cid:4)ध कराया जा सकता ह।ै (cid:10)रयल टाइम डाटा को वत(मान एस.सी.ए.डी.ए. .णाली पर अंत(cid:10)रत 7कए जान े के िलए पी.डी.सी. को ओ.पी.सी. (ऑ(cid:4)ज े(cid:25)ट Gल’कग एडं इDब ेGडग फॉर .ोसेस कं(cid:26)ोल) सव(र भी उपल(cid:4)घ कराया गया ह।ै¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 507 उ&त र 8े9 कV अSणी प(cid:10)रयोजना चालू 7कए जान े से िविभ3न ,थ ान^ से उपल(cid:4)ध फैजर डाटा, एन.आर.एल.डी.सी. तथा इसके वत(मान एस.सी.ए.डी.ए. .णाली पर उपल(cid:4)ध ह।g फैजर डाटा uारा िSड के िविभ3न के34 ^ के बीच लोड को कुछ ही िमलीसेक(cid:19)ड के अपडेशन टाइम के अंदर अिधक शुhता के साथ उपल(cid:4)ध कराया जाता ह ै और इससे िSड .चालन के िलए उपल(cid:4)ध उपकरण^ कV 8मता म(cid:19) वृिh होती ह।ै डाटा िह,ट ो (cid:10)रयन डी.पी.सी. स े एकि9त आंकड़़^ को संSिहत करता ह ै जो िSड कV 7कसी घटना के उपरातं िवiल ेषण हते ु उपयोगी हो सकेगा। िवगत म(cid:19) भी लो 7Ž(cid:25)व ै3स ी ओि,लेशन का पता लगाने तथा िस,ट म इ3ट ीSेटेड .ोटे(cid:25)श न ,क Vम (एस.आई.पी.एस.) .चालन कV जLच के िलए इन आंकड़^ का .योग 7कया गया ह।ै 5555....3333....5555 भभभभााााररररतततत मममम (cid:27)(cid:27) (cid:27)(cid:27)ववववZZैैZZैै सस सस आआआआधधधधाााा((((ररररतततत (cid:12)(cid:12)(cid:12)(cid:12)मम मम ााााटटटट!! !! पपपपााााररररेेेेषषषषणणणण िििि1111डडडड ककककेेेे ििििललललएएएए ययययोोोोजजजजननननाााा अ3य 8े9^ म(cid:19) भी पी.एम.यू. अिधJठ ािपत करन े का .,त ाव .7)याधीन ह।ै वैDस .ौ!ोिगकV के पूण( 7)या3व यन के िलए .&य ेक 8े9 म(cid:19) (भारत कV 12वd आयोजना म (cid:19) आरंिभक चरण म(cid:19) करीब 1500 स े 1700) पी.एम.यू. अिधJठ ािपत 7कए जाने के साथ-साथ हाई बgड िव(cid:143)थ और 3य ूनतम .सुिr (ली,ट लेटे3स ी) सिहत िवiव सनीय सूचना नेटवक( अपेि8त होगा। िSड के िविभ3न मह&व पूण( ,थ ान^ और िनयं9ण के34 ^ पर पी.एम.यू. सिहत (12वd आयोजना म(cid:19) करीब 50-60) फैजर डाटा कंसे3(cid:26) ेटर लगाए जाने का .,ताव ह।ै समS राJ(cid:26) ीय िSड के एकVकृत Wप से काय( करने के िलए (cid:10)रयल टाइम ,ट ेट मॉिनटHरग हते ु सोपािनक )म म(cid:19) रा2य िव!ुत पारेषण के34 ^ के पास मा,ट र पी.डी.सी. तथा राJ(cid:26) ीय और 8े9ीय पारेषण के34 ^ के पास सुपर पी.डी.सी. होनी चािहए। इस अवधारणा को िनDन संरचना म (cid:19) .,त ुत 7कया गया ह।ै : Back up NLDC NLDC Remote Console Super PDC at RPCs at RLDCs Master PDC at SLDCs Nodal PDC at sub- Nodal PDC at sub-station station State Stns State Stns Centre Stns Router/switch Router/switch Router/switch PMU PMU PMU PMU PMU PMU 1 n 1 n 1 n Sub Stn A Sub Stn B Sub Stn B भारत म (cid:19) बड़ी संmय ा म (cid:19) पी.एम.यू. और पी.डी.सी. कV आवiय कता को दखे ते aए य7द दशे म(cid:19) ही ,व दशे ी ,त र पर िनमा(ण तथा जLच कV सुिवधा उपल(cid:4)ध हो, तो यह अ&य ंत लाभदायक होगा।508 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 5555....3333....6666 फफफफााााइइइइबबबबरररर ऑऑऑऑििििJJJJटटटटकककक आआआआधधधधाााा((((ररररतततत ससससचचचचंंंं ाााारररर (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी कककक.... आआआआववववIIIIयय यय ककककतततताााा cव िन एवं आकं ड़ े का िवiव सनीय सचं ार िववेचना&म क Wप से मह&व पूण( होता ह।ै .भावी संचार .णाली कV आवiय कताk से sय ापक 8े9 मापन .ौ!ोिगकV, एस.सी.ए.डी.ए. .णाली तथा दरू ,थ .चालन जैस े िवशेष संर8ण उपकरण^ का .चलन बढ़ा ह।ै उपयोग 7कया जा रहा ह।ै संचार मं9ालय uारा 2.3 से 2.5 गेगा हXस( पर ऑपरेट कर रह े आधुिनक ऊजा( .णाली को ‘,म ाट( (cid:26)ांसिमशन िSड’ बनाने हते ु िविभ3न पॉवर िस,ट म एिलम(cid:19)3X स के (cid:10)रयल टाइम डाटा को पान े के िलए, उपके34 , उ&प ादन संयं9, एच.वी.डी.सी. Gलक, अंतरा(2य ीय पारेषण लाइन इ&य ा7द पूव( अपे8ाए ं बन गई ह।g वत(मान म(cid:19) ऊजा( .णाली .चालन म(cid:19) संचार कV तीन िविधय^-पी.एल.सी.सी., माइ)ोवेव, एवं फाइबर ऑि*टक का माइ)ोवेव को वापस िलया जा रहा ह।ै पी.एल.सी.सी. को ऊजा( .णाली का एक अिभ3न अंग माना जाता ह ै और इसके िलए इसका उपयोग ऊजा( .णाली को सरं 8ण दने े तथा सीिमत दायरे म (cid:19) cव िन सं.ेिषत करन े म(cid:19) 7कया जाता ह।ै य े सभी आवiय कताए ं आि*टक फाइबर कDय ूिनकेशन (ओ.एफ.सी.) uारा पूरी कV जा सकती ह।g 5555....3333....7777 पपपपीीीी....एएएएमममम....यययय..ूू..ूू आआआआधधधधाााा((((ररररतततत (cid:12)(cid:12)(cid:12)(cid:12)मम मम ााााटटटट!! !! (cid:17)(cid:17)(cid:17)(cid:17)ाााा5555सस सस ििििममममशशशशनननन िििि1111डडडड सससस ेे ेेससससभभंंभभंं ााााििििववववतततत ललललााााभभभभ िSड के मह&व पूण( ,थ ान^ पर पी.एम.यू. तथा पी.डी.सी. कV उपल(cid:4)ध ता, सश(cid:25)त फाइबर ऑि*टक कDय ूिनकेशन नेटवक( तथा समुिचत उपकरण^ के 7)या3व यन से िनDन िलिखत लाभ ह^गे :- (cid:2) िSड कV ि,थितपरक जानकारी तथा कोणीय एवं वो(cid:18)ट ेज ि,थरता के संबंध म(cid:19) िSड कV गितशीलता। (cid:2) पारेषण माग( (को(cid:10)रडोर) कV 8मता म(cid:19) अनुकूलतम वृिh। (cid:2) िSड पैरामीटर को बनाए रखने म(cid:19) िव!ुत .वाह िनयं9ण एवं िनयमन। (cid:2) 7कसी ऊजा( .णाली म(cid:19) मांग के अनुकूल sय व,थ ा .बंधन के िलए लोड शेGडग तथा लोड िनयं9ण जैसी अ3य .ौ!ोिगकV । (cid:2) उपचारी काय-( योजनाk (आर.ए.एस.) तथ ा .णाली एकVकृत संर8ण योजनाk (एस.आई.पी.एस.) का िवकास (cid:2) .बल आपातकालीन ि,थित म(cid:19) िSड कV खराबी को रोकन े के िलए 7कए जान े वाले िनवारक काय{ कV पहचान करना। (cid:2) इंटर-ए(cid:10)रया ओि,लेशन मॉिनटHरग। (cid:2) एडिै *टव आईलgGडग (cid:2) नेटवक( मॉडल .माणीकरण (cid:2) सी.टी./सी.वी.टी. कैिलRेशन आ7द ****************************************¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 509 अअअअ(cid:2)(cid:2)(cid:2)(cid:2)यय यय ाााायययय –––– 6666 11111111वववव(((( पपपपचचंंचचंं ववववषषषष****यययय ययययोोोोजजजजननननाााा----(cid:6)(cid:6)(cid:6)(cid:6)गगगगिििितततत ततततथथथथाााा ककककाााायययय(cid:28)(cid:28)%%(cid:28)(cid:28)%% मममम 6666....1111 आआआआममममुखुखुखुख 6666....1111....1111 10वd पंचवषCय योजना के अंत म(cid:19) 31 माच,( 2007 तक कुल 132 गेगावाट सं,थ ािपत ऊजा( 8मता तथा sय ,त अविध म (cid:19) 101 गेगावाट कV बढ़ी मांग कV तुलना म(cid:19) दशे म(cid:19) 765/एच.वी.डी.सी./400/230/220 के.वी. पारेषण .णाली पर पारेषण लाइन 8मता 198 हजार स6कट 7कलोमीटर (टी.सी.के.एम.) और उपके34 8मता 257 जी.वी.ए. थी। 6666....1111....2222 10वd पंचवषCय योजना म(cid:19) िव!ुत कV कमी (13.8 .ितशत मुmय समय म(cid:19) तथा 9.6 .ितशत ऊजा( म(cid:19)) को cय ान म(cid:19) रखत े aए और 17व(cid:19) ई.पी.एस. कV भिवJय वाणी के अनुसार मांग को पूरा करन े के िलए 11वd पंचवषCय योजना म(cid:19) उ&प ादन 8मता म(cid:19) 78.7 गेगावाट अित(cid:10)र(cid:25)त वृिh का आंकलन 7कया गया था। तथािप सीिमित संसाधान^ एवं 17वd ई.पी.एस. अनुमािनत लqय ^ कV तुलना म(cid:19) मांग वृिh म(cid:19) अपे8ाकृत कम होने के कारण 8मता संवध(न काय()म^ कV समी8ा कV गई तथा उसी के अनसु ार 11वd पंचवषCय योजना म(cid:19) 8.2 गेगावाट हाइEो, 50.8 गेगावाट थम(ल तथा 3.4 गेगावाट 3य ूि(cid:25)लयर सिहत 62.4 गेगावाट उ&प ादन वृिh का लqय िनधा((cid:10)रत 7कया गया। 62.4 गेगावाट के इस काय()म के अनWु प, उ&प ादन प(cid:10)रयोजनाk कV सचू ी के आधार पर 132 के.वी. तथा इससे ऊपर कV पारेषण आवiयकताk के साथ-साथ िव!ुत िनJक ष(ण .णाली और नेटवक( संवध(न .णाली को िचि3हत 7कया गया था। 11वd पचं वषCय योजना म(cid:19) उ&प ादन िवकास के 8े9 म(cid:19) वा,त िवक गित तथा 8े9वार वा,त िवक लोड वृिh के अनुWप क(cid:19)4ीय पारेषण तथा रा2य पारेषण कंपिनय^ uारा उनके पारेषण िवकास काय()म कV sय ापक पंचवषCय योजना बनाने तथा अंितम ,व Wप दने े म(cid:19) यह पारेषण काय()म आधार बन गया। 6666....1111....3333 62.4 गेगावाट योजना के अनुWप 11वd पंचवषCय योजना के दौरान वा,त िवक उ&प ादन 8मता वृिh म (cid:19) प(cid:10)रवत(न होता रहा। तदनWु प, 11वd पंचवषCय योजना के वा,त िवक पारेषण काय()म म(cid:19) भी प(cid:10)रवतन( aआ। संबh पारेषण .णाली म(cid:19) प(cid:10)रवत(न^ के अित(cid:10)र(cid:25)त ,थ िगत/चूक/प(cid:10)रवtतत उ&प ादन के अनुWप भी पारेषण आवiय कताk म(cid:19) समी8ा 7कए जाने कV आवiय कता aई। तदनुसार, उ&प ादन प(cid:10)रयोजनाk तथा वा,त िवक आवiय कता कV तुलना म(cid:19) जारी पारेषण काय()म^ के िनJप ादन का पुनरी8ण 7कया गया। मागा(िधकार (राइट ऑफ वे) के मुo^, वन िवभाग स े अनमु ित न िमलने/िवलंब होने, उपके34 ^ हते ु ,थ ान कV उपल(cid:4)ध ता न होन े के कारण कुछ पारेषण काय()म^ म (cid:19) िवलंब/अवरोध aआ। 6666....2222 11111111ववववEEEE पपपपचचंंचचंं ववववषषषषTTTTयययय ययययोोोोजजजजननननाााा पपपपााााररररेेेेषषषषणणणण ककककाााायययय>>!!>>!! मममम ककककाााा ससससााााररररााााशशंंशशंं :::: आठवd, नवd, तथा 10वd पंचवषCय योजना अविध के अंत म(cid:19) दशे म(cid:19) अtजत पारेषण .णाली कV उपलि(cid:4)धयां िनDन िलिखत ह g :- ययययििूूििूू ननननटटटट 8888ववववEEEE पपपपचचंंचचंं 9999ववववEEEE पपपपचचंंचचंं ववववषषषषTTTTयययय 11110000ववववEEEE पपपपचचंंचचंं ववववषषषषTTTTयययय ववववषषषषTTTTयययय ययययोोोोजजजजननननाााा ककककेेेे अअअअततंंततंं ययययोोोोजजजजननननाााा ककककेेेे अअअअततंंततंं ((((ममममााााचचचच,,!!,,!! ययययोोोोजजजजननननाााा ककककेेेे ततततकककक ((((ममममााााचचचच,,!!,,!! 2222000000007777)))) अअअअततंंततंं ततततकककक 2222000000002222)))) ((((ममममााााचचचच,,!!,,!! 1111999999997777)))) पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन (cid:27)(cid:27) (cid:27)(cid:27) 8888ववववEEEE पपपपचचंंचचंं ---- 9999ववववEEEE पपपपचचंंचचंं ववववषषषषTTTTयययय 11110000ववववEEEE पपपपचचंंचचंं ववववषषषषTTTTयययय ययययोोोोजजजजननननाााा ययययोोोोजजजजननननाााा ववववषषषषTTTTयययय ययययोोोोजजजजननननाााा एच.वी.डी.सी. ++++////---- 555500000000 के.वी. स6कट 1111666633334444 3333111133338888 5555888877772222 7कमी.510 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 777766665555 के.वी. स6कट 7कमी. 0000 999977771111 2222111188884444 444400000000 के.वी. स6कट 7कमी. 33336666111144442222 44449999333377778888 77775555777722222222 222233330000////222222220000 के.वी. के.वी. स6कट 7कमी. 77779999666600000000 99996666999999993333 111111114444666622229999 एच.वी.डी.सी. 222200000000 के.वी. स6कट 7कमी. 0000 111166662222 111166662222 मोनोपोल सक ल पारेषण लाइन स6कट 7कमी. 111111117777333377776666 111155550000666644442222 111199998888555566669999 ए.सी. उपके34 8वd पंच 9वd पंचवषCय 10वd पंचवषCय वषCय योजना योजना योजना 777766665555 के.वी. एमवीए 0000 0000 0000 444400000000 के.वी. एमवीए 44440000888866665555 66660000333388880000 99992222999944442222 222233330000////222222220000 के.वी. एमवीए 88884444111177777777 111111116666333366663333 111155556666444499997777 कुल ए.सी. उपके34 एमवीए 111122225555000044442222 111177776666777744443333 222244449999444433339999 एच.वी.डी.सी. टtमनल मेगावाट 8वd पंच 9वd पंचवषCय 10वd पंचवषCय वषCय योजना योजना योजना एच.वी.डी.सी. बाइपोल मेगावाट 1111555500000000 3333222200000000 5555222200000000 ++++मानोपोल एच.वी.डी.सी. बी.टी.बी. मेगावाट 1111555500000000 2222000000000000 3333000000000000 एएएएचचचच....ववववीीीी....डडडडीीीी....ससससीीीी.... टटटटXXXXममममननननलललल कककक.... ममममेगेगेगेगााााववववााााटटटट 3333000000000000 5555222200000000 8888222200000000 ससससककककलललल (cid:7)(cid:7)(cid:7)(cid:7)ममममतततताााा 11111111ववववEEEE पपपपचचंंचचंं ववववषषषषTTTTयययय ययययोोोोजजजजननननाााा मममम (cid:27)(cid:27) (cid:27)(cid:27)(cid:30)(cid:30)(cid:30)(cid:30)गगगगिििितततत ककककाााा ससससााााररररााााशशंंशशंं :::: पपपपााााररररेेेेषषषषणणणण (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी ययययििूूििूू ननननटटटट 11110000ववववEEEE पपपपचचंंचचंं ववववषषषषTTTTयययय 11111111ववववEEEE पपपपचचंंचचंं 11111111ववववEEEE पपपपचचंंचचंं ववववषषषषTTTTयययय ययययोोोोजजजजननननाााा (cid:30)(cid:30)(cid:30)(cid:30)ककककाााारररर////ववववोोोो4444टट टट ेेजजेेजज ^^^^ेणेणेणेणीीीी ययययोोोोजजजजननननाााा ककककेेेे अअअअततंंततंं ववववषषषषTTTTयययय ययययोोोोजजजजननननाााा ककककेेेे अअअअततंंततंं ततततकककक (((( ममममााााचचचच,,!!,,!! ततततकककक (((( ममममााााचचचच,,!!,,!! मममम (cid:27)(cid:27) (cid:27)(cid:27)ववववििृृििृृ BBBB #### 2222000011112222)))) 2222000000007777)))) पारेषण लाइन(cid:19) (क) एच.वी.डी.सी. +/- 500 स6कट 5872 3560 9432 7कमी. के.वी. बाइपोल (ख) 765 के.वी. स6कट 2184 3546 5250 7कमी. (ग) 400 के.वी. स6कट 75722 37645 106819 7कमी. (घ) 230/220 के.वी. स6कट 114629 25175 135980 7कमी. (ड़) एच.वी.डी.सी. 200 स6कट 162 -162* 0 7कमी. के.वी. मोनोपोल सक ल पारेषण लाइन(cid:19) स6कट 198569 69926 257481 7कमी. उपके34 (क) 765 के.वी. एमवीए 0 25000 25000¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 511 (ख) 400 के.वी. एमवीए 92942 58085 151027 (ग) 230/220 के.वी. एमवीए 156497 67277 223774 कुल उपके34 एमवीए 249439 150362 399801 एच.वी.डी.सी. (क) पाइपोल Gलक 8मता मेगावाट 5000 1750 6750 (ख) बैक-टू-बैक 8मता मेगावाट 3000 0 3000 (c) एच.वी.डी.सी. 220 मेगावाट 200 -200* 0 के.वी. मोनो-पोल (क), (ख) एवं (ग) का योग मेगावाट 8200 1750 9750 **** बरसुर-लोवर िसलWे मोनोपोल .चालन म(cid:19) नहd ह।ै #### 10वd पंचवषCय योजना तक खdची गई कुल िव!ुत लाइन^ के आंकड़^ को स6कट 7कलोमीटर म(cid:19) दशा(या गया ह।ै 11वd पंचवषCय योजना अविध से नीितय^ म(cid:19) प(cid:10)रवत(न aआ ह।ै इसम(cid:19) केवल वे लाइन(cid:19) हg, जो चालू हो गई ह g अथवा चालू 7कए जाने हते ु तैयार ह।g तदनWु प, 11वd पंच वषCय योजना म(cid:19) अित(cid:10)र(cid:25)त 10852 स6कट 7कलोमीटर (765 के.वी.-480 स6कट 7कलोमीटर, 400 के.वी.-6548 स6कट 7कलोमीटर तथा 220 के.वी.- 3824 स6कट 7कलोमीटर) का समायोजन 7कया गया ह।ै 6666....3333 11111111ववववEEEE पपपपचचंंचचंं ववववषषषषTTTTयययय ययययोोोोजजजजननननाााा मममम (cid:27)(cid:27) (cid:27)(cid:27)एएएएचचचच....ववववीीीी....डडडडीीीी....ससससीीीी.... (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी ककककाााा ििििववववककककाााासससस :::: नवd पंचवषCय योजना अविध म(cid:19) भारत म(cid:19) एच.वी.डी.सी. .णाली िवकास का सारांश िनDन िलिखत सा(cid:10)रणी म (cid:19) .,त ुत ह ै : एच.वी.डी.सी. पारेषण .णाली 10वd 11वd 11वd पंच पंच पंच वषCय वषCय वषCय योजना के योजना योजना अंत तक के अंत म(cid:19) (माच(, तक संवध(न 2012) एच.वी.डी.सी. बाइपोल लाइन च34 पुर – पडघे ± 500 एम.एस.ई. स6कट 1504 1504 बी. 7कलोमीटर के.वी. (cid:10)रहदं -ददरी ± 500 पीजीसीआई स6कट 1634 1634 एल 7कलोमीटर के.वी. तेलचर-कोलार ± 500 पीजीसीआई स6कट 2734 2734 एल 7कलोमीटर के.वी. बिलया-िभवड़ी (2500 मेगावाट) ± 500 पीजीसीआई स6कट 1580 1580 एल 7कलोमीटर के.वी. मु34 ा - मोिह3द रगढ़ ± 500 अदानी स6कट 1980 1980 7कलोमीटर के.वी. ययययोोोोगगगग 5555888877772222 3333555566660000 9999444433332222 एच.वी.डी.सी. बाइपोल पारेषण 8मता च34 पुर – पडघे बाइपोल एम.एस.ई. मेगावाट 1500 1500 बी.512 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] (cid:10)रह3द -ददरी बाइपोल पीजीसीआई मेगावाट 1500 1500 एल तलचर – कोलार बाइपोल पीजीसीआई मेगावाट 2000 500 2500 एल बिलया-िभवडी बाइपोल पीजीसीआई मेगावाट 1250 1250 एल मु34 ा - मोिह3द रगढ़ बाइपोल अदानी मेगावाट ययययोोोोगगगग ममममेगेगेगेगााााववववााााटटटट 5555000000000000 1111777755550000 6666777755550000 एच.वी.डी.सी. बैक-टू-बैक पारेषण 8मता िव3c य ाचल बी.-टी.- पीजीसीआई मेगावाट 500 500 बी. एल च34 पुर बी.-टी.- पीजीसीआई मेगावाट 1000 1000 बी. एल गजुआका बी.-टी.- पीजीसीआई मेगावाट 1000 1000 बी. एल सासाराम बी.-टी.- पीजीसीआई मेगावाट 500 500 बी. एल ययययोोोोगगगग ममममेगेगेगेगााााववववााााटटटट 3333000000000000 0000 3333000000000000 एच.वी.डी.सी. मोनोपाल लाइन बरसुर –लोवर िसलWे 200 सी.एस.ई. स6कट 162 162* बी./ए.पी.टी. 7कलोमीटर के.वी. आर.ए.एन. एस.सी.ओ. ययययोोोोगगगग ससससYYYYककककटटटट 111166662222 ----111166662222**** 0000 VVVVककककललललोोोोममममीीीीटटटटरररर एएएएचचचच....ववववीीीी....डडडडीीीी....ससससीीीी.... ममममोोोोननननोोोोपपपपाााालललल पपपपााााररररेेेेषषषषणणणण (cid:7)(cid:7)(cid:7)(cid:7)ममममतततताााा बरसुर –लोवर िसलWे मोनोपाल सी.एस.ई.बी./ मेगावाट 200 200* ए.पी.टी.आर. ए.एन.एस.सी. ओ. ययययोोोोगगगग 222200000000 ----222200000000**** 0000 ससससककककलललल ययययोोोोगगगग स6कट 6666000033334444 3333555566660000 9999444433332222 7कलोमीटर ममममेगेगेगेगााााववववााााटटटट 8888222200000000 1111777755550000 9999777755550000 * बरसुर–लोवर िसलWे मोनोपोल .चालन म(cid:19) नहd ह।ै 6666....4444 11111111ववववEEEE पपपपचचंंचचंं ववववषषषषTTTTयययय ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन 777766665555 ककककेेेे....ववववीीीी.... (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी ककककाााा ििििववववककककाााासससस :::: 10वd पंचवषCय योजना तक दशे म(cid:19) सभी 765 के.वी. .णाली, 440 के.वी. पर .चािलत थे। िसतDब र, 2007 म(cid:19) सबस े पहले िसपत स े सेउनी .णाली को 765 के.वी. पर .चािलत 7कया गया। दशे म(cid:19) पारेषण के 8े9 म(cid:19) यह मील का प&थ र सािबत aआ। भारत म(cid:19) 11वd पंचवषCय योजना के दौरान 765 के.वी. पारेषण .णाली के िवकास का साराशं िनDन िलिखत ह ै :¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 513 765 के.वी. पारेषण .णाली 10वd 11वd पंच 11वd पंच पंच वषCय वषCय वषCय योजना के योजना के योजना दौरान अंत तक के म(cid:19) वृिh (माच(, 2012) 777766665555 ककककेेेे....ववववीीीी.... पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन (cid:27)(cid:27) (cid:27)(cid:27) अनपरा-उ3न ाव एस./सी. यूपीपीसीएल स6कट 409 409 7कमी. 7कशेनपुर-मोगा एल.-1 (ड(cid:4)(cid:18) य ू.) एस./सी. पीजीसीआईएल स6कट 275 275 7कमी. 7कशेनपुर-मोगा एल.-2 ( ई.) एस./सी. पीजीसीआईएल स6कट 287 287 7कमी. टेहरी-मेरठ लाइन-1 एस./सी. पीजीसीआईएल स6कट 186 186 7कमी. टेहरी-मेरठ लाइन-2 एस./सी. पीजीसीआईएल स6कट 184 184 7कमी. आगरा-Pव ािलयर लाइन-1 एस./सी. पीजीसीआईएल स6कट 128 128 7कमी. आगरा-बीना लाइन-1 एस./सी. जी.सी.आई.एल. स6कट 235 235 7कमी. गया-बिलया एस./सी. पीजीसीआईएल स6कट 228 228 7कमी. बिलया-लखनऊ एस./सी. पीजीसीआईएल स6कट 320 320 7कमी. िसपत-सेवनी लाइन-1 एस./सी. पीजीसीआईएल स6कट 351 351 7कमी. िसपत-सेवनी लाइन-2 एस./सी. पीजीसीआईएल स6कट 354 354 7कमी. सेवनी-बीना (400 के.वी. पर एस./सी. पीजीसीआईएल स6कट 293 293 .चालन आरंभ 7कया जाना ह)ै 7कमी. सेवनी-वधा( लाइन-1 (400 एस./सी. पीजीसीआईएल स6कट 269 269 के.वी. पर .चालन आरंभ 7कया 7कमी. जाना ह)ै सेवनी-वधा( लाइन-2 (400 एस./सी. पीजीसीआईएल स6कट 261 261 के.वी. पर .चालन आरंभ 7कया 7कमी. जाना ह)ै Pव ािलयर–बीना लाइन-2 एस./सी. पीजीसीआईएल स6कट 233 233 7कमी. आगरा-Pव ािलयर लाइन-2 (400 एस./सी. पीजीसीआईएल स6कट 128 128 के.वी. पर .चालन आरंभ 7कया 7कमी. जाना ह)ै514 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] टेहरी पूGलग *व ाइंट पर टेहरी एस./सी. पीजीसीआईएल स6कट 21 21 एल.आइ(.एल.ओ.-मेरठ डी./सी. 7कमी. लाइन (400 के.वी. पर आवेिशत 7कया जाना ह)ै टेहरी पूGलग *व ाइंट पर टेहरी एस./सी. पीजीसीआईएल स6कट 16 16 एल.आइ(.एल.ओ. िसपत-सेवनी 7कमी. (िसपत के पास ड(cid:4)(cid:18) य ू. आर पूGलग ,टेशन पर दसू री सीकेटी) सासाराम-फतेहपुर (लाइन-1) एस./सी. पीजीसीआईएल स6कट 337 337 7कमी. सतना-बीना लाइन -1 एस./सी. पीजीसीआईएल स6कट 274 274 7कमी. बीना-इ3द ौर एस./सी. पीजीसीआईएल स6कट 311 311 7कमी. गया-सासाराम एस./सी. पीजीसीआईएल स6कट 148 148 7कमी. अनपरा बी –उ3न ाव .ित,थ ापना एस./सी. यूपीपीसीएल स6कट 1 1 7कमी. अनपरा-बी से अनपरा-सी *व ाइंट अनपरा बी –उ3न ाव .ित,थ ापना एस./सी. यूपीपीसीएल स6कट 1 1 7कमी. उ3न ाव म(cid:19) टtमनल *व ाइंट ययययोोोोगगगग ससससYYYYककककटटटट 1111777700004444 3333555544446666 5555222255550000 VVVVककककममममीीीी.... 777766665555 ककककेेेे....ववववीीीी.... उउउउपपपपककककेेेे5555CC CC सेवनी उपके34 पीजीसीआईएल एमवीए 1500 1500 सेवनी नया पीजीसीआईएल एमवीए 1500 1500 सेवनी िव,त ार पीजीसीआईएल एमवीए 1500 1500 फतेहपुर पीजीसीआईएल एमवीए 3000 3000 गया पीजीसीआईएल एमवीए 3000 3000 िसपत के पास प.8े. पूGलग पीजीसीआईएल एमवीए 3000 3000 बिलया पीजीसीआईएल एमवीए 3000 3000 लखनऊ पीजीसीआईएल एमवीए 3000 3000 वधा( पीजीसीआईएल एमवीए 4500 3000 उ3न ाव यूपीपीटीसीएल एमवीए 1000 1000 ययययोोोोगगगग एएएएममममववववीीीीएएएए 0000 22225555000000000000 22225555000000000000 6666....5555 11111111ववववEEEE पपपपचचंंचचंं ववववषषषषTTTTयययय ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन (cid:30)(cid:30)(cid:30)(cid:30)गगगगिििितततत एएएएवववव ंं ंंककककाााायययय>>!!>>!! मममम :::: 400 के.वी. एवं 220 के.वी. पारेषण .णाली के संबंध म(cid:19) 11वd पंचवषCय योजना के .थम चार वष{ अथा(त 2007-08, 2008-09, 2009-10, 2010-11 एवं 2011-12 कV वा,त िवक उपलि(cid:4)ध )मश: अनुलPन क-6.1, 6.2, 6.3, 6.4 तथा अनुलPन क 6.5 म(cid:19) िव,त ृत Wप से दी गई ह।ै इनम(cid:19) अतरा(2य ीय पारेषण .णाली तथा अंत:रा2य ीय पारेषण .णाली दोन^ शािमल ह।g 11वd पंचवषCय योजना कV उपलि(cid:4)ध िनDन िलिखत ह ै :-¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 515 6666....5555....1111 ववववषषषष !! !!2222000000007777----00008888 ककककेेेे ददददौौौौरररराााानननन पपपपााााररररेेेेषषषषणणणण (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी मममम (cid:27)(cid:27) (cid:27)(cid:27)ससससववंंववंं धधधधनन!!नन!! :::: वष( 2007-08 म(cid:19) 12,440 स6कट 7कलोमीटर पारेषण लाइन (220 के.वी. एवं इससे अिधक) तथा 24,423 एमवीए (cid:26)ांसफारमेशन 8मता को चालू 7कया गया। उ(cid:18)ल ेखनीय ह ै 7क आरएपीपी िव,त ार प(cid:10)रयोजना (2 x 220 मेगावाट) के चालू 7कए जाने के पहले ही िवशेष .यास^ से आरएपीपी-कं)ोली डी/सी लाइन पूरी कर ली गई, परंतु xधन कV उपल(cid:4)ध ता न होने से इस प(cid:10)रयोजना स े उ&प ादन नहd िलया जा सका। माच(, 2008 म(cid:19) िसपत प(cid:10)रयोजना के 500 मेगावाट यूिनट #5 के आरंभ होन े से पहले िसतDब र, 2007 म(cid:19) 765 के.वी. एस/सी िसपत- सेवनी लाइन चालू करने कV एक अ3य उपलि(cid:4)ध हािसल aई। 765, 400 एवं 220 के.वी. कV पारेषण लाइन(cid:19) तथा उपके34 , जो वष( 2007-08 म(cid:19) पूरे 7कए गए, उनके िववरण अनुलPन क 6.1 म(cid:19) 7दए गए ह g :- 6666....5555....2222 ववववषषषष !! !!2222000000008888----00009999 ककककेेेे ददददौौौौरररराााानननन पपपपााााररररेेेेषषषषणणणण (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी मममम (cid:27)(cid:27) (cid:27)(cid:27)ससससववंंववंं धधधधनन!!नन!! :::: वष( 2008-09 म(cid:19) 9913 स6कट 7कलोमीटर पारेषण लाइन (220 के.वी. एवं इसस े अिधक) तथा 16,680 एमवीए (cid:26)ांसफारमेशन 8मता को चालू 7कया गया। िसपत एस.टी.पी.पी.-। उ&प ादन के34 से िव!तु िनJक ष(ण के िलए 765 के.वी. िसपत-सेवनी लाइन ।।, एस/सी, 354 स6कट 7कलोमीटर को अ.ैल, 2008 म(cid:19) चालू 7कया गया। कहलगाँव एस.टी.पी.पी.-।। से िव!ुत िनJक ष(ण हते ु 765 के.वी. आगरा-Pव ािलयर िuतीय एस/सी, (400 के.वी. पर .चािलत) 128 स6कट 7कलोमीटर को माच(, 2009 म(cid:19) चालू 7कया गया। िसपत एस.टी.पी.पी.-। पारेषण लाइन से िव!तु िनJक ष(ण के िलए 765 के.वी. िसव नी-वधा( लाइन, एस/सी, 269 स6कट 7कलोमीटर को माच(, 2009 म(cid:19) चालू 7कया गया तथा वष( 2008-09 के दौरान 765, 400 एवं 220 के.वी. कV पारेषण लइन^ के साथ-साथ उपके34 ^ को पूरा 7कया गया, िजस े अअअअननननललुुललुु ____नन नन कककक 6666....2222 म(cid:19) 7दया गया ह।ै 6666....5555....3333 ववववषषषष !! !!2222000000009999----11110000 ककककेेेे ददददौौौौरररराााानननन पपपपााााररररेेेेषषषषणणणण (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी मममम (cid:27)(cid:27) (cid:27)(cid:27)ससससववंंववंं धधधधनन!!नन!! :::: वष( 2009-10 म(cid:19) 11,790 स6कट 7कलोमीटर पारेषण लाइन (220 के.वी. एवं इससे अिधक) तथा 21,315 एमवीए (cid:26)ांसफारमशे न 8मता को चालू 7कया गया। पिZम 8े9 पारेषण .णाली को सश(cid:25)त 7कए जान े हते ु 765 के.वी. (400 के.वी. पर .चािलत) बीना से Pव ािलयर (233 स6कट 7कलोमीटर) को फरवरी, 2010 म(cid:19) चालू 7कया गया। 765 के.वी. सवे नी से बीना एस/सी लाइन (400 के.वी. पर .चािलत) को भी माच,( 2010 म(cid:19) चालू 7कया गया, िजस े िव!ुत उ&प ादन के34 स े जोड़ा गया ह।ै इसे बाड उ&प ादन के34 के चाल ू होने से पहले ही पूरा कर िलया गया। वष( 2009-10 के दौरान 765, 400 एव ं 220 के.वी. कV पारेषण लाइन^ के साथ-साथ उपके34 ^ को पूरा 7कया गया, िजसे अनलु Pन क 6.3 म (cid:19) 7दया गया ह।ै 6666....5555....4444 ववववषषषष !! !!2222000011110000----11111111 ककककेेेे ददददौौौौरररराााानननन पपपपााााररररेेेेषषषषणणणण (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी मममम (cid:27)(cid:27) (cid:27)(cid:27)ससससववंंववंं धधधधनन!!नन!! :::: वष( 2010-11 म(cid:19) लगभग 15,367 स6कट 7कलोमीटर पारेषण लाइन (220 के.वी. एवं इससे अिधक) तथा 31,657 एमवीए (cid:26)ांसफारमेशन 8मता को पूरा 7कए जाने का लqय .ाr 7कया गया। वष( 2010- 11 के दौरान 765, 400 एवं 220 के.वी. कV पारेषण लाइन^ के साथ-साथ उपके34 ^ को पूरा 7कया गया, िजसे अनुलPन क 6.4 म(cid:19) 7दया गया ह।ै 6666....5555....5555 ववववषषषष !! !!2222000011111111----11112222 ककककेेेे ददददौौौौरररराााानननन पपपपााााररररेेेेषषषषणणणण (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी मममम (cid:27)(cid:27) (cid:27)(cid:27)ससससववंंववंं धधधधनन!!नन!! :::: वष( 2011-12 म(cid:19) माच(, 2012 तक लगभग 20,434 स6कट 7कलोमीटर पारेषण लाइन (220 के.वी. एव ं इससे अिधक) तथा 54,287 एमवीए (cid:26)ांसफारमेशन 8मता को पूरा 7कए जाने का लqय .ाr 7कया गया। 11वd पंच वषCय योजना के दौरान वष( 2011-12 म(cid:19) 765, 400 एवं 220 के.वी. कV पारेषण लाइन^ के साथ-साथ उपके34 ^ को पूरा 7कया गया, िजस े अअअअननननललुुललुु ____नन नन कककक 6666....5555 म(cid:19) 7दया गया ह।ै 6666....6666 11111111ववववEEEE पपपपचचंंचचंं ववववषषषषTTTTयययय ययययोोोोजजजजननननाााा मममम (cid:27)(cid:27) (cid:27)(cid:27)अअअअततंंततंं रररर----(cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ीीीीयययय पपपपााााररररेेेेषषषषणणणण (cid:7)(cid:7)(cid:7)(cid:7)ममममतततताााा ककककाााा ििििववववककककाााासससस :::: 6666....6666....1111 11111111ववववEEEE पपपपचचंंचचंं ववववषषषषTTTTयययय ययययोोोोजजजजननननाााा ककककेेेे अअअअततंंततंं ततततकककक JJJJररररगग गग िििितततत औऔऔऔरररर उउउउपपपपललललिििि(cid:2)(cid:2)(cid:2)(cid:2)धधधधययययाााा ंं ंं ::::516 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 10वd पंचवषCय योजना के अंत तक 132 के.वी. तथा इससे अिधक के िलए अंतर-8े9ीय पारेषण 8मता 14050 मेगावाट थी। 11वd पंच वषCय योजना के दौरान (अ.ैल, 2007 से माच(, 2012 तक) 13900 मेगावाट अंतर-8े9ीय पारेषण 8मता को जोड़ा गया ह,ै िजससे 7दनांक 31.03.2012 तक (132 के.वी. एवं इससे अिधक वो(cid:18)ट ेज लवे ल पर) कुल अंतर-8े9ीय पारेषण 8मता 27750 मेगावाट हो गई। (इसम(cid:19) शािमल ह-ै (i) 2100 मगे ावाट गया-बिलया 765 के.वी. एस/सी लाइन, िजसे 400 के.वी. पर आपातकािलक sय व,थ ा के Wप म(cid:19) चाल ू 7कया गया ह,ै तथा (ii) 2100 मेगावाट सासाराम-फतेहपुर 765 के.वी. एस/सी लाइन, िजसे गया-फतेहपुर लाइन के Wप म(cid:19) 765 के.वी. लेवल पर चालू 7कया गया। इसम(cid:19) 200 मेगावाट बरसुर-लोवर िसलW एच.वी.डी.सी. मोनोपोल को शािमल नहd 7कया गया ह,ै जो 7क अभी .चालन म(cid:19) नहd ह।ै ) 11वd पंचवषCय योजना के अंत तक अंतर-8े9ीय 8मता का िववरण िनDन िलिखत ह:ै ((((पपपपााााररररेेेेषषषषणणणण (cid:7)(cid:7)(cid:7)(cid:7)ममममतततताााा ककककेेेे....ववववीीीी.... मममम)))(cid:27)(cid:27))(cid:27)(cid:27) 11110000ववववEEEE पपपपचचंंचचंं 11111111ववववEEEE पपपपचचंंचचंं 11111111ववववEEEE पपपपचचंंचचंं 11111111ववववEEEE पपपपचचंंचचंं ववववषषषषTTTTयययय ययययोोोोजजजजननननाााा ककककेेेे अअअअततंंततंं ततततकककक अअअअततंंततंं रररर----(cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ीीीीयययय (cid:7)(cid:7)(cid:7)(cid:7)ममममतततताााा ववववषषषषTTTTयययय ववववषषषषTTTTयययय ववववषषषषTTTTयययय ककककाााा ििििववववववववररररणणणण ययययोोोोजजजजननननाााा ककककेेेे ययययोोोोजजजजननननाााा मममम (cid:27)(cid:27) (cid:27)(cid:27) ययययोोोोजजजजननननाााा ककककेेेे अअअअततंंततंं ततततकककक ससससववंंववंं धधधधनन!!नन!! अअअअततंंततंं ततततकककक पपपपूवूवूवूवTTTT (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे –––– ददददिििि(cid:7)(cid:7)(cid:7)(cid:7)णणणणीीीी (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ((((ईईईई....आआआआरररर....----एएएएसससस....आआआआरररर....)))):::: गजुवाका एच.वी.डी.सी. बैक-टू-बैक 1000 1000 बालीमेला-अपर िसलेW 220 के.वी. एस/सी. 130 130 तलचर-कोलार एच.वी.डी.सी. बाइपोल 2000 2000 तलचर-कोलार एच.वी.डी.सी. बाइपोल का अपSेडशे न 500 500 पपपपूवूवूवूवTTTT (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे –––– ददददिििि(cid:7)(cid:7)(cid:7)(cid:7)णणणणीीीी (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ((((ईईईई....आआआआरररर....----एएएएसससस....आआआआरररर....)))) ककककाााा ययययोोोोगगगग :::: 3333111133330000 555500000000 3333666633330000 पपपपूवूवूवूवTTTT (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे –––– उउउउDDDDतत तत ररररीीीी (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ((((ईईईई....आआआआरररर....----एएएएनननन....आआआआरररर....)))) :::: मुजBफरपुर-गोरखपुर 400 के.वी. डी/सी 2000 2000 टी.सी.एस.सी. सिहत ((cid:25)व ाड मूज) दहे री-सा‘पुरी 220 के.वी. एस./सी. 130 130 पटना-बिलया 400 के.वी. डी/सी. (cid:25)व ाड 800 800 1600 िबहारशरीफ-बिलया 400 के.वी. डी/सी. (cid:25)व ाड 1600 1600 बाड-बिलया -400 के.वी. डी/सी. (cid:25)व ाड # 1600 1600 सासाराम-फतेहपुर 765 के.वी. एस/सी लाइन-1 ## 2100 2100 गया- बिलया 765 के.वी. एस/सी * 2100 2100 सासाराम : 500 500 1000 (i) एच.वी.डी.सी. बैक टू बैक (ii) सासाराम-इलाहाबाद/वाराणसी 400 के.वी. डी/सी को ,थ ािपत करन े हते ु एच.वी.डी.सी. बैक टू बैक का बाईपाGसग पपपपूवूवूवूवTTTT (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे –––– ददददिििि(cid:7)(cid:7)(cid:7)(cid:7)णणणणीीीी (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ((((ईईईई....आआआआरररर....----एएएएनननन....आआआआरररर....)))) ककककाााा ययययोोोोगगगग :::: 3333444433330000 8888777700000000 11112222111133330000 पपपपूवूवूवूवTTTT (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे –––– पपपपिििि````ममममीीीी (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ((((ईईईई....आआआआरररर....----डडडड(cid:2)(cid:2)(cid:2)(cid:2)44 44 यय यय ..ूू..ूू आआआआरररर....)))):::: राउरकेला-रायपुर 400के.वी. डी/सी 1000 1000 राउरकेला-रायपुर 400के.वी. डी/सी पर टी.सी.एस.सी. 400 400 बुिधपारा-कोरबा 220 के.वी. डी/सी+एस/सी 390 390 रांची-िसपत 300 के.वी. डी/सी (40% एस/सी) 1200 1200¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 517 रांची-राउरकेला-रायपुर 400के.वी. डी/सी 7फ(cid:25), ड िस(cid:10)रज 1400 1400 कैपािसटर सिहत, टी.सी.एस.सी. कV समानातं र लाइन रांची –पिZम 8े9 (िसपत) 765 के.वी. एस/सी पूGलग $$ - *व ाइंट एस/सी पपपपूवूवूवूवTTTT (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे –––– पपपपिििि````ममममीीीी (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ((((ईईईई....आआआआरररर....----डडडड(cid:2)(cid:2)(cid:2)(cid:2)44 44 यय यय ..ूू..ूू आआआआरररर....)))) ककककाााा ययययोोोोगगगग :::: 1111777799990000 2222666600000000 4444333399990000 पपपपूवूवूवूवTTTT (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे –––– पपपपववूूववूू PPPPDDDDतत तत रररर (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ((((ईईईई....आआआआरररर....----एएएएनननन....ईईईई....आआआआरररर....)))):::: बीरपाड़ा-सलाकती 220 के.वी. डी/सी 260 260 मालदा-ब^गईगांव 400 के.वी. डी/सी 1000 1000 ब^गईगांव-िसिलगुड़ी 400 के.वी. डी/सी (cid:25)व ाड ** $$ - पपपपूवूवूवूवTTTT (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे –––– पपपपववूूववूू PPPPDDDDतत तत रररर (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ((((ईईईई....आआआआरररर....----एएएएनननन....ईईईई....आआआआरररर....)))) ककककाााा ययययोोोोगगगग :::: 1111222266660000 1111222266660000 उउउउDDDDतत तत रररर (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे –––– पपपपिििि````मममम (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ((((ईईईई....आआआआरररर....----डडडड(cid:2)(cid:2)(cid:2)(cid:2)44 44 यय यय ..ूू..ूू आआआआरररर)))):::: िव3c य ाचल एच.वी.डी.सी. बैक टू बैक 500 500 औरैया-मालनपुर 220 के.वी. डी/सी 260 260 कोटा-उ2ज ैन 220 के.वी. डी/सी 260 260 आगरा-Pव ािलयर 765 के.वी. एस/सी लाइन-1 400 1100 1100 7कलोवट (.चालन) आगरा-Pव ािलयर 765 के.वी. एस/सी लाइन-2 400 1100 1100 7कलोवट (.चालन) कं)ोली-जेदा( 400 के.वी. डी/सी 1000 1000 उउउउDDDDतत तत रररर (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे –––– पपपपिििि````मममम (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ((((ईईईई....आआआआरररर....----डडडड(cid:2)(cid:2)(cid:2)(cid:2)44 44 यय यय ..ूू..ूू आआआआरररर....)))) ककककाााा ययययोोोोगगगग :::: 2222111122220000 2222111100000000 4444222222220000 पपपपिििि````ममममीीीी (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ----ददददिििि(cid:7)(cid:7)(cid:7)(cid:7)णणणणीीीी (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ((((डडडड(cid:2)(cid:2)(cid:2)(cid:2)44 44 यय यय ..ूू..ूू आआआआरररर....----एएएएसससस....आआआआरररर....)))) :::: चं4पुर एच.वी.डी.सी. बैक टू बैक 1000 1000 बरसुर-लोवर िसलेW 200 के.वी. एच.वी.डी.सी. मोनोपोल @@@@ 200 (-200) 0 को(cid:18)ह ापुर-बेलगाम 220 के.वी. डी/सी 260 260 पो3ड ा-नागाझरी 220 के.वी. डी/सी 260 260 पपपपिििि````ममममीीीी (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ----ददददिििि(cid:7)(cid:7)(cid:7)(cid:7)णणणणीीीी (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ((((डडडड(cid:2)(cid:2)(cid:2)(cid:2)44 44 यय यय ..ूू..ूू आआआआरररर....----एएएएसससस....आआआआरररर....)))) ककककाााा ययययोोोोगगगग :::: 1111777722220000 1111555522220000 भभभभााााररररतततत मममम (cid:27)(cid:27) (cid:27)(cid:27) ((((222200000000 ककककेेेे....ववववीीीी.... एएएएवववव ंं ंंइइइइसससससससस ेे ेेअअअअििििधधधधकककक)))) ककककुुुुलललल ममममगगेेगगेे ााााववववााााटटटट 11113333444455550000 11113333999900000000 22227777111155550000 132के.वी./110 के.वी. अंतर-8े9ीय Gलक 4xडी/सी + $$$$ 666600000000 0000 666600000000 4Xएस/सी = 12 सीकेटीएस (ckts) भभभभााााररररतततत मममम (cid:27)(cid:27) (cid:27)(cid:27) ((((111111110000////111133332222 ककककेेेे....ववववीीीी.... एएएएवववव ंं ंं इइइइसससससससस ेे ेेअअअअििििधधधधकककक)))) ककककुुुुलललल ममममगगेेगगेे ााााववववााााटटटट 11114444000055550000 11113333999900000000 22227777777755550000518 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ननननोोोोटटटट :::: @@@@ - 200 मेगावाट एच.वी.डी.सी. मोनोपोल वत(मान म(cid:19) .चालन म(cid:19) नहd ह।ै $$$$ - 132/110 के.वी. लाइन समय-समय पर रेिडयल मोड म(cid:19) .चािलत कV जाती ह।ै *- गया-बिलया 765 के.वी. एस/सी लाइन को 400 के.वी. पर आपातका लीन sय व,थ ा के Wप म (cid:19) चाल ू 7कया गया ह।ै ** - िनजी 8े9 के अधीन ह।ै # - 1600 मेगावाट, बाड-ब िलया लाइन के 400 के.वी. डी/सी को पूरा 7कया जा चुका ह।ै ## -सासाराम-फतेहपुर लाइन को 765 के.वी. पर गया-फतेहपुर लाइन के Wप म(cid:19) चालू 7कया गया ह।ै $$ - 12वd पंच वषCय योजना के .ारंिभक अविध हते ु बढ़ाई गई। 6666....6666....2222 11111111ववववEEEE पपपपचचंंचचंं ववववषषषषTTTTयययय ययययोोोोजजजजननननाााा मममम (cid:27)(cid:27) (cid:27)(cid:27)अअअअततंंततंं रररर----(cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ीीीीयययय (cid:7)(cid:7)(cid:7)(cid:7)ममममतततताााा कककक.... ििििननननधधधधाााा((!!((!! ररररतततत ययययोोोोजजजजननननाााा कककक.... ततततललुुललुु ननननाााा मममम (cid:27)(cid:27) (cid:27)(cid:27)उउउउपपपपललललिििि(cid:2)(cid:2)(cid:2)(cid:2)धधधध :::: 11वd पंच वषCय योजना के अंत तक मcय ाविध मू(cid:18)य ांकन (एम.टी.ए.) के अनुWप अतं र-8े9ीय Gलक कV पारेषण 8मता कV िनधा((cid:10)रत योजना 32650 मेगावाट थी। को(cid:18)ह ापुर ि,थत 1000 मेगावाट टtमनल के बैक-टू-बैक एच.वी.डी.सी. सिहत नरे34 -को(cid:18)ह ापुर 400 के.वी. डी/सी लाइन कV समी8ा कV गई और इस े नरे34 (कना(टक दि8णी 8े9) तथा को(cid:18)ह ापुर (महाराJ(cid:26) -पिZमी 8े9) के बीच 765 के.वी. Gलक के Wप म(cid:19) उपयोग 7कए जाने कV योजना बनाई गई ह।ै यह डी/सी लाइन होगी, जो शुWआत म(cid:19) 400 के.वी. 8मता स े .चािलत कV जाएगी। इस लाइन को अब 12वd पंच वषCय योजना म(cid:19) पूण( 7कए जान े कV योजना ह।ै अत: 31650 मेगावाट 8मता म(cid:19) से 11वd पंच वषCय योजना म(cid:19) 27950 मेगावाट चालू कV गई। गया-बिलया 765 के.वी. एस/सी लाइन को 400 के.वी. पर आपातकालीन sय व,थ ा के Wप म(cid:19) तथा सासाराम-फतेहपरु लाइन को 765 के.वी. पर गया-फतेहपुर लाइन के Wप म(cid:19) चालू 7कया गया । शेष 3700 मेगावाट 8मता Gलक कV ि,थित िनDन िलिखत सा(cid:10)रणी म(cid:19) दी जा रही ह ै : >>>>मममम अअअअततंंततंं रररर----(cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ीीीीयययय अअअअततंंततंं रररर---- VVVV>>>>ययययाााा5555वव वव ययययनननन ककककररररनननन ेे ेे ययययोोोोजजजजननननाााा ककककाााा ननननाााामममम पपपपूणूणूणूण !! !!VVVVककककएएएए सससस..ंं..ंं 9999ललललकककक (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ीीीीयययय ववववााााललललीीीी एएएएजजजजे5े5े5े5सस सस ीीीी जजजजाााानननन ेे ेेकककक.... ममममेगेगेगेगााााववववााााटटटट ससससभभंंभभंं ााााििििववववतततत (cid:7)(cid:7)(cid:7)(cid:7)ममममतततताााा ििििततततििििथथथथ 1. रांची- 2100 पीजीसीआईएल 765 के.वी. पूGलग ,ट ेशन कV साझा योजना अग,त , पिZमी 8े9 तथा उ&त री 8े9 हते ु नेटवक( (सासन 2012 पूGलग यू.एम.पी.पी.पी.++++एन.के.पी.++++मैथन/कोडमा(/ ,ट ेशन 765 मेिजया/बोकारो/रघुनाथपुर/दगु ा(पुर++++पूवC के.वी. 8े9 से उ&त री 8े9 और पूव=&त र एस/सी 8े9/दि8णी 8े9/पिZमी 8े9 वाया पूवC लाइन 8े9 से आयात हते ु साझा) के एक अंग के Wप म(cid:19) एवं पिZमी 8े9 हते ु सामा3य नेटवक( योजना(एन.के.पी.++++मैथन/कोडमा(/मेिजया/ बोकारो++++रघुनाथपुर/दगु ा(पुर++++ पूवC 8े9 से उ&त री 8े9 को पूव=&त र 8े9/दि8णी 8े9/पिZमी 8े9 वाया पूवC 8े9 से आयात हते ु साझा)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 519 2. ब^गईगLव- 1600 मेसस( ,ट रलाइट उ&त री 8े9 uारा पूव=&त र/पवू C 8े9 के माच(, िसिलगुड़ी उ&त र पूव( सर*ल स आयात को सुिनिZत करने के िलए 2013 400 के.वी. इंटरकने(cid:25)श न पारेषण योजना (एल.ओ.आ डी/सी (cid:25)व ाड कंपनी िलिमटेड ई 7दनांक लाइन 07.01.20 10 को जारी 7कया गया।) ययययोोोोगगगग 3700 6666....7777 11111111ववववEEEE पपपपचचंंचचंं ववववषषषषTTTTयययय ययययोोोोजजजजननननाााा ककककेेेे VVVV>>>>ययययाााा5555वव व व ययययनननन मममम (cid:27)(cid:27) (cid:27)(cid:27)चचचचननुुननुु ौौौौििििततततययययाााा ँँ ँँ 6666....7777....1111 चचचचननुुननुु ौौौौििििततततययययाााा ँँ ँँ:::: पारेषण प(cid:10)रयोजनाए,ं आगामी उ&प ादन प(cid:10)रयोजनाk तथा संबh िनJक ष(ण लाइन^ को चालू 7कए जान े म(cid:19) 7कसी .कार के िवलंब/sय ितरेक, िजससे ऊजा( बािधत हो सकती ह,ै को cय ान म(cid:19) रखते aए बनाई जाती ह।g कुछ पारेषण काय{ को पूरा करने म(cid:19) काया(3व यन एजेि3सय^ के सामने चुनौितयाँ आती ह।g इनम(cid:19) से मुmय सम,य ाए ं ह g –––– जंगल^ म (cid:19) स े माग( बनाना, मागा(िधकार (राइट ऑफ वे) कV सम,य ा तथा उपके34 ^ के िलए जगह कV उपल(cid:4)ध ता। 11वd पंच वषCय योजना म(cid:19) िजन पारेषण लाइन प(cid:10)रयोजनाk (220 के.वी. एव ं इससे अिधक) पर काय( चल रहा था, उ3ह (cid:19) पूरा करने म(cid:19) काया(3व यन एजेि3सय^ uारा जगं ल^ से माग( बनाने म(cid:19) िजन बड़ी सम,य ाk का सामना करना पड़ा, उनके िववरण अअअअननननललुुललुु ____नन नन कककक – 6666....6666 म(cid:19) 7दए गए ह।g 6666....7777....2222 जजजजगगंंगगंं लललल सससस ेे ेेममममाााागगगग !! !!बबबबननननााााननननाााा :::: जंगल^ के एक छोर से दसू रे छोर तक िव!ुत लाइन िबछाने म(cid:19) जंगल कV कटाई करना अिनवाय( होता है। य!िप िव!ुत माग(-िनधा(रण के समय जंगल^, राJ(cid:26) ीय उ!ान^, व3य जीव अ“य ाहरण^ इ&य ा7द से बचने पर जोर 7दया जाता ह,ै 7फर भी इनसे पूरी तरह से बच पाना संभव नहd होता ह।ै जंगल^ कV कटाई-छटाई हते ु लंबी .7)या तथा कई ,त र^ के जुड़ े होने के कारण इसम(cid:19) बaत अिधक समय लग जाता ह।ै प(cid:10)रयोजना .ािधकारी को Sाम सभा से अनुमित लेने म(cid:19) सम,य ाk का सामना करना पड़ता ह ै (cid:25)य ^7क वन अिधिनयम, 2006 के अंतग(त ऐसा 7कया जाना अिनवाय( कर 7दया गया ह।ै इतना ही नहd पया(वरण एवं वन मं9ालय से अनुमित लने े म(cid:19) .,त ाव अSेिषत करने हते ु रा2य सरकार(cid:19) काफV समय ले लेती ह।g 6666....7777....3333 ममममाााागगगगाााािि!!िि!! धधधधककककाााारररर ((((ररररााााइइइइटटटट ऑऑऑऑफफफफ वववव))ेे))ेे :::: पारेषण वो(cid:18)ट ेज अिधक होन े के कारण टावर लगान े तथा मागा(िधकार (राइट ऑफ व)े के िलए जमीन कV आवiय कता काफV हद तक बढ़ गई ह।ै य!िप मागा(िधकार (राइट ऑफ वे) कV आवiय कताk को अनुकूलतम बनाने म(cid:19) उपल(cid:4)ध आधुिनकतम .ौ!ोिगकV समाधान को अपनाने के बावजूद इसके प(cid:10)रणाम^ म(cid:19) िवलंब होने के कारण पारेषण प(cid:10)रयोजनाk के 7)या3व यन म(cid:19) मुिiकल(cid:19) आती ह।g मागा(िधकार (राइट ऑफ वे) हते ु मू(cid:18)य ांकन एवं 8ितपूtत के िनधा(रण म(cid:19) भी एक रा2य से दसू रे रा2य के मानक^ म(cid:19) अंतर होता ह।ै 6666....7777....4444 उउउउपपपपककककेेेे5555CC CC ,,,, हहहहततेेततेे ुु ुुजजजजममममीीीीनननन अअअअििििधधधध1111हहहहणणणण:::: उपके34 ^ हते ु भ-ू अिधSहण अिधिनयम-1984 के अंतग(त सामा3य तया सरकारी अथवा .ाइवेट जमीन कV उपल(cid:4)ध ता सुिनिZत कराई जाती ह।ै हालां7क नए उपनगर^ को बसाने तथा औ!ोिगक के34 ^ कV पंच वषCय योजना बनात े समय उपके34 ^ कV ,थ ापना तथा पारेषण लाइन^ को भी cय ान म(cid:19) रखा जाना चािहए। महानगर^, पव(तीय तथा अ3य शहरी 8े9^ म(cid:19) उपकेन् 4^ को लगाने म(cid:19) जमीन कV आवiय कता को कम 7कए520 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] जाने हते ु गैस इ3स ुलेटेड उपके34 ^ (जी.आई.एस.) को अिधकािधक लगाया जा रहा ह,ै (cid:25)य ^7क परंपरागत उपके34 ^ कV तुलना म(cid:19) इसके िलए 30 .ितशत कम जगह कV आवiय कता होती ह।ै 6666....8888 11111111ववववEEEE पपपपचचंंचचंं ववववषषषषTTTTयययय ययययोोोोजजजजननननाााा मममम (cid:27)(cid:27) (cid:27)(cid:27)(cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ीीीीयययय िििि1111डडडड,,,, ककककाााा ििििववववककककाााासससस :::: 11वd पंच वषCय योजना म (cid:19) चल रही िनDन िलिखत पारेषण योजनाk को या तो पूरा कर िलया गया ह ै अथवा इसी दौरान उन पर काय( आरंभ कर 7दया गया ह।ै उ&प ादन प(cid:10)रयोजनाk से जुड़ी aई िविभ3न योजनाk के अंतग(त पारेषण .णाली तथा अतरा(ज् यीय पारेषण .णाली को संवtधत करने वाली योजनाए ं अअअअननननललुुललुु ____नन नन कककक----6666....7777 म(cid:19) िविभ3न सारणी म(cid:19) दशा(यी गई ह।g 6666....8888....1111 उउउउDDDDतत तत ररररीीीी (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे :::: उ&त री 8े9 म(cid:19) .णाली संवध(न कV योजनाए ं .णाली संवध(न कV योजना पपपपााााररररेेेेषषषषणणणण (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी हहहहततेेततेे ुु ुुससससाााा((((ररररणणणणीीीी ससससaaंंaaंं यय यय ाााा एन.आर.एस.एस.एस.-XIII एन.आर.-आईएस-01/सी.एच.-6 (योजना िनमा(णाधीन ह)ै एन.आर.एस.एस.एस.-XIV एन.आर.-आईएस-02/सीएच.-6 एन.आर.एस.एस.एस.- XV एन.आर.-आईएस-03/सीएच.-6 (योजना िनमा(णाधीन ह)ै एन.आर.एस.एस.एस.-XVI एन.आर.-आईएस-04/सीएच.-6 (योजना िनमा(णाधीन ह)ै एन.आर.एस.एस.एस.- XVII एन.आर.-आईएस-05/सीएच.-6 एन.आर.एस.एस.एस.-XVIII एन.आर.-आईएस-06/सीएच.-6 (योजना िनमा(णाधीन ह)ै उउउउDDDDतत तत रररर (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथतततत उउउउDDDDपप पप ााााददददनननन पपपप((((ररररययययोोोोजजजजननननााााUUUU ककककेेेे ििििललललएएएए एएएए....टटटटीीीी....एएएएसससस.... :::: रररराााा""""यय यय जजजजहहहहbbbb उउउउDDDDपप पप ााााददददनननन पपपप((((ररररययययोोोोजजजजननननाााा िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथतततत हहहह ैै ैै आआआआईईईई....ससससीीीी.... (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे पपपपााााररररेेेेषषषषणणणण (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी हहहहततेेततेे ुु ुुससससाााा((((ररररणणणणीीीी ((((ममममगगेेगगेे ााााववववााााटटटट)))) ससससaaंंaaंं यय यय ाााा िहमांचल .दशे :::: चामेरा III एच.ई.पी. (12वd पंच वषCय 231 एन.आर.-एच.पी.-01/ सीएच.-6 योजना के िलए बढ़ा दी गई) क(cid:19)4ीय (िनमा(णीधीन पारेषण .णाली) पारबती III एच.ई.पी. (12वd पंच वषCय 520 क(cid:19)4ीय एन.आर.-एच.पी.-02/ सीएच.-6 योजना के िलए बढ़ा दी गई) (िनमा(णीधीन पारेषण .णाली) करचम वांPट ू एच.ई.पी. 1000 आईपीपी एन.आर.-एच.पी.-03/ सीएच.-6 (िनमा(णीधीन पारेषण .णाली) बुडिहल एच.ई.पी. 70 आईपीपी एन.आर.-एच.पी.-04/ सीएच.-6 (12वd पंच वषCय योजना के िलए बढ़ा दी गई) मलाना ।। एच.ई.पी. 100 आईपीपी एन.आर.-एच.पी.-05/ सीएच.-6 जDम ू एवं कiम ीर यूरी-।। एच.ई.पी. 240 क(cid:19)4ीय एन.आर.ज.े के.-01/सीएच-6 (12वd पंच वषCय योजना के िलए बढ़ा दी (िनमा(णीधीन पारेषण .णाली) गई)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 521 रररराााा""""यय यय जजजजहहहहbbbb उउउउDDDDपप पप ााााददददनननन पपपप((((ररररययययोोोोजजजजननननाााा िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथतततत हहहह ैै ैै आआआआईईईई....ससससीीीी.... (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे पपपपााााररररेेेेषषषषणणणण (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी हहहहततेेततेे ुु ुुससससाााा((((ररररणणणणीीीी ((((ममममगगेेगगेे ााााववववााााटटटट)))) ससससaaंंaaंं यय यय ाााा चौतक (12वd पंच वषCय योजना के िलए बढ़ा दी 44 क(cid:19)4ीय एन.आर.-जे.के..-02/ सीएच.-6 गई) िनDब ू बाजगू 45 क(cid:19)4ीय एन.आर.-जे.के. -03/ सीएच.-6 (12वd पंच वषCय योजना के िलए बढ़ा दी गई) उउउउDDDDतत तत ररररााााखखखखडडंंडडंं ककककोोोोटटटटेेIIेेIIवव वव रररर ((((यययय..ूू..ूू 1111----यययय44ूू44ूू )))) 400 क(cid:19)4ीय एन.आर.य.ू के.-01/ सीएच.-6 VVVVदददद4444लल लल ीीीी .गित सी.सी.जी.टी. फेज-।।। (पी.पी.सी.एल.) 750 रा2य एन.आर.-डी.एल.01/ सीएच.-6 (जी.टी.1, जी.टी.2, जी.टी.3) (12वd पंच वषCय योजना के िलए बढ़ा दी गई) (cid:10)रठाला सी.सी.पी.पी.पी. (एन.डी.पी.एल) 108 आईपीपी. एन.आर.-डी.एल.02/ सीएच.-6 हहहह((((ररररययययााााणणणणाााा झ2ज र -। (इं7दरा गांधी ) टी.पी.एस. (य.ू -1, 2) 1000 क(cid:19)दीय एन.आर.-एच.आर.01/ सीएच.-6 झ2ज र -। (महा&म ा गांधी ) टी.पी.एस. 1320 आईपीपी. एन.आर.-एच.आर.02/ सीएच.-6 ररररााााजजजज(cid:12)(cid:12)(cid:12)(cid:12)थथ थथ ाााानननन जजजजिििि4444ललललपपपपाााा ककककपपपपददुुददुु TTTT टी.पी.पी. (य.ू -1-4) 540 आईपीपी. एन.आर.-आर.जे.01/ सीएच.-6 (राज वे,ट पावर) उउउउDDDDतत तत रररर (cid:30)(cid:30)(cid:30)(cid:30)ददददशशशशेेेे अनपरा ‘सी’ (लgको अनपरा पी.पी.एल. य.ू -1,2) 1200 आईपीपी. एन.आर.-य.ू पी.01/ सीएच.-6 हरदआु गंज टी.पी.एस. (य.ू -8) 250 रा2य एन.आर.-य.ू पी.02/ सीएच.-6 पपपप((((ररररछछछछाााा टटटटीीीी....पपपपीीीी....एएएएसससस.... ििििवववव(cid:12)(cid:12)(cid:12)(cid:12)तत तत ाााारररर 500 रा2य एन.आर.-य.ू पी.03/ सीएच.-6 रोसा ,ट े. ।। (य.ू -3 एवं 4) 600 िनजी एन.आर.-यू.पी.04/ सीएच.-6 (िनमा(णीधीन पारेषण .णाली) 6666....8888....2222 पपपपिििि````ममममीीीी (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे :::: पपपपिििि````ममममीीीी (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे मममम (cid:27)(cid:27) (cid:27)(cid:27)(cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी ससससववंंववंं धधधधनन!!नन!! ययययोोोोजजजजननननााााएएएए::ंं::ंं .णाली संवध(न योजना पपपपााााररररेेेेषषषषणणणण (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी हहहहततेेततेे ुु ुुससससाााा((((ररररणणणणीीीी ससससaaंंaaंं यय यय ाााा पिZमी 8े9 संवध(न योजना-।। प.8े.-आईएस-01/ सीएच.-6 (cid:1)(cid:1)(cid:1)(cid:1)(cid:3)(cid:3)ुु(cid:3)(cid:3)ुु टटटट ककककोोोोईईईई ववववधधैैधधैै (cid:12)(cid:12)(cid:12)(cid:12)ललललकककक ननननहहहह(cid:16)(cid:16)(cid:16)(cid:16) पिZमी 8े9 संवध(न योजना- X !!!! .... (cid:1)(cid:1)(cid:1)(cid:1)(cid:3)(cid:3)ुु(cid:3)(cid:3)ुु टटटट ककककोोोोईईईई ववववधधैैधधैै (cid:12)(cid:12)(cid:12)(cid:12)ललललकककक ननननहहहह(cid:16)(cid:16)(cid:16)(cid:16) पिZमी 8े9 संवध(न योजना- XI !!!! .... पपपपिििि````ममममीीीी (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे मममम (cid:27)(cid:27) (cid:27)(cid:27)िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथतततत उउउउDDDDपप पप ााााददददनननन पपपप((((ररररययययोोोोजजजजननननााााUUUU हहहहततततेेेे ुु ुुएएएए....टटटटीीीी....एएएएसससस.... रररराााा""""यय यय जजजजहहहहbbbb उउउउDDDDपप पप ााााददददनननन पपपप((((ररररययययोोोोजजजजननननाााा िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथतततत हहहह ैै ैै आआआआईईईई....ससससीीीी.... (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे पपपपााााररररेेेेषषषषणणणण (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी हहहहततेेततेे ुु ुुससससाााा((((ररररणणणणीीीी ससससaaंंaaंं यय यय ाााा ((((ममममगगेेगगेे ााााववववााााटटटट)))) गगगगजजुुजजुु रररराााातततत हहहहजजजजीीीीरररराााा टटटटीीीी....पपपपीीीी....पपपपीीीी.... ((((जजजजीीीी....एएएएसससस....ईईईई....ससससीीीी....एएएएलललल....)))) 351 रा2य ड(cid:4)(cid:18) य ू.आर.-जी.जे.-01/ सीएच.6 (िनमा(णीधीन पारेषण .णाली) ममममुंCुंCुंCुंCाााा टटटटीीीी....पपपपीीीी....पपपपीीीी.... फफफफेेेेजजजज ।।।।।।।। ((((अअअअददददााााननननीीीी पपपपााााववववरररर)))) 1320 आईपीपी ड(cid:4)(cid:18) य ू.आर.-जी.जे.-02/ सीएच.6 (िनमा(णीधीन पारेषण .णाली) ममममुंCुंCुंCुंCाााा टटटटीीीी....पपपपीीीी....पपपपीीीी.... फफफफेेेेजजजज ।।।।।।।।।।।। 1980 आईपीपी. ड(cid:4)(cid:18) य ू.आर.-जी.जे.-03/ सीएच.6522 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] रररराााा""""यय यय जजजजहहहहbbbb उउउउDDDDपप पप ााााददददनननन पपपप((((ररररययययोोोोजजजजननननाााा िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथतततत हहहह ैै ैै आआआआईईईई....ससससीीीी.... (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे पपपपााााररररेेेेषषषषणणणण (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी हहहहततेेततेे ुु ुुससससाााा((((ररररणणणणीीीी ससससaaंंaaंं यय यय ाााा ((((ममममगगेेगगेे ााााववववााााटटटट)))) सूरत िलPन ाइट िव,त ार 250 आईपीपी. ड(cid:4)(cid:18) य ू.आर.-जी.जे.-04/ सीएच.6 ए,स ार-सलाया पावर यू.-1 600 आईपीपी. ड(cid:4)(cid:18) य ू.आर.-जी.जे.-05/ सीएच.6 ममममहहहहाााारररराााा(cid:16)(cid:16)(cid:16)(cid:16)(cid:17)(cid:17) (cid:17)(cid:17) भुसावल टी.पी.पी. (एम.एस.पी.जी.सी.एल.) 1 0 00 रा2य ड(cid:4)(cid:18) य ू.आर.-एम.एच.-01/ सीएच.6 खपेरखेड़ा टी.पी.एस. 500 रा2य ड(cid:4)(cid:18) य ू.आर.-एम.एच.-02/ सीएच.6 (एम.एस.पी.जी.सी.एल.) (िनमा(णीधीन पारेषण .णाली) जजजज..ेे..ेे एएएएसससस....डडडड(cid:2)(cid:2)(cid:2)(cid:2)44 44 यय यय ..ूू..ूू एएएएननननजजजजTTTT ((((ररररDDDDनननन ााााििििगगगगररररीीीी ििििललललििििममममटटटटेेेेडडडड)))) 1 2 0 0 आईपीपी. ड(cid:4)(cid:18) य ू.आर.-एम.एच.-03/ सीएच.6 ििििममममहहहहाााानननन टटटटीीीी....पपपपीीीी....पपपपीीीी.... 200 आईपीपी. ड(cid:4)(cid:18) य ू.आर.-एम.एच.-04/ सीएच.6 ((((अअअअििििभभभभजजजजीीीीतततत एएएएननननजजजजTTTT)))) मममम;;;;यय यय (cid:30)(cid:30)(cid:30)(cid:30)ददददशशेेशशेे महiे व र एच.ई.पी. 400 आ ड(cid:4)(cid:18) य ू.आर.-एम.पी..-01/ सीएच.6 (12वd पंच वषCय योजना के िलए बढ़ा दी ई.पी.पी. (िनमा(णीधीन पारेषण .णाली) गई) छछछछDDDDतत तत ीीीीससससगगगगढ़ढ़ढ़ढ़ (िनमा(णीधीन पारेषण .णाली) िसपत-1 1980 क(cid:19)4ीय ड(cid:4)(cid:18) य ू.आर.-सी.जी.-01/ सीएच.6 एस.वी. पावर टी.पी.पी. 63 आईपीपी. ड(cid:4)(cid:18) य ू.आर.-सी.जी.-02/ सीएच.6 कसाईप(cid:18)ल ी टी.पी.पी. य.ू -1 135 आईपीपी. ड(cid:4)(cid:18) य ू.आर.-सी.जी.-03/ सीएच.6 6666....8888....3333 ददददिििि(cid:7)(cid:7)(cid:7)(cid:7)णणणणीीीी (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ददददिििि(cid:7)(cid:7)(cid:7)(cid:7)णणणणीीीी (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे मममम (cid:27)(cid:27) (cid:27)(cid:27)(cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी ससससववंंववंं धधधधनन!!नन!! ययययोोोोजजजजननननााााएएएए ंंंं (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी ससससववंंववंं धधधधनन!!नन!! ययययोोोोजजजजननननाााा पपपपााााररररेेेेषषषषणणणण (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी हहहहततेेततेे ुु ुुससससाााा((((ररररणणणणीीीी ससससaaंंaaंं यय यय ाााा एस.आर.एस.एस.एस. -IX एस.आर.-आई.एस.-01/ सीएच.6 एस.आर.एस.एस.एस. -X एस.आर.-आई.एस.-02/ सीएच.6 एस.आर.एस.एस.एस. -XI एस.आर.-आई.एस.-03/ सीएच.6 ददददिििि(cid:7)(cid:7)(cid:7)(cid:7)णणणणीीीी (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे मममम (cid:27)(cid:27) (cid:27)(cid:27)िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथतततत उउउउDDDDपप पप ााााददददनननन पपपप((((ररररययययोोोोजजजजननननााााUUUU हहहहततततेेेे ुु ुुएएएए....टटटटीीीी....एएएएसससस.... ररररााााजजजज यय् ् यय् ् जजजजहहहहbbbb उउउउDDDDपप पप ााााददददनननन पपपप((((ररररययययोोोोजजजजननननाााा िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथतततत हहहह ैै ैै आआआआईईईई....ससससीीीी.... (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे पपपपााााररररेेेेषषषषणणणण (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी हहहहततेेततेे ुु ुुससससाााा((((ररररणणणणीीीी ((((ममममगगेेगगेे ााााववववााााटटटट)))) ससससaaंंaaंं यय यय ाााा आआआआddंंddंं (cid:30)(cid:30)(cid:30)(cid:30)ददददशशेेशशेे िसDह ा4ी टी.पी.एस. ,ट े.-।। (एनटीपीसी) 1000 क(cid:19)4ीय एस.आर.-ए.पी.-01/ सीएच.-6 नागाज(न सागर टीआर एचईपी (2x25 मेगावाट) 50 रा2य एस.आर. -ए.पी.-02/ सीएच.-6 (12वd पंच वषCय योजना के िलए बढ़ा दी गई) (िनमा(णीधीन पारेषण .णाली) ि.यदश(नी-जुराला एचईपी (6xxxx39 मेगावाट) 234 रा2य एस.आर-ए.पी.-03/ सीएच.-6 कका(cid:10)टया (भूपलप(cid:18) ल ी) टी.पी.एस. य.ू -1 500 रा2य एस.आर.-ए.पी.-04/ सीएच-6 कोठागुडम टी.पी.एस. एस.टी -VI 500 रा2य एस.आर.ए.पी.-05/ सीएच.-6 ककककननननााााटट!!टट!! कककक उउउउडडडडाााापपपपीीीी टटटटीीीी....पपपपीीीी....एएएएसससस.... ((((यययय..ूू..ूू पपपपीीीी....ससससीीीी....एएएएलललल....)))) 1200 आईपीपी. एस.आर.-के.ए.-01/ सीएच.-6¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 523 ररररााााजजजज यय् ् यय् ् जजजजहहहहbbbb उउउउDDDDपप पप ााााददददनननन पपपप((((ररररययययोोोोजजजजननननाााा िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथतततत हहहह ैै ैै आआआआईईईई....ससससीीीी.... (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे पपपपााााररररेेेेषषषषणणणण (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी हहहहततेेततेे ुु ुुससससाााा((((ररररणणणणीीीी ((((ममममगगेेगगेे ााााववववााााटटटट)))) ससससaaंंaaंं यय यय ाााा (िनमा(णीधीन पारेषण .णाली) तोरांग(cid:18)ल ू य.ू 1,2 600 आईपीपी. एस.आर.-के.ए.-02/ सीएच.-6 बे(cid:18)ल ारी टी.पी.पी. य.ू -1,2 1000 रा2य एस.आर.-के.ए.-03/ सीएच.-6 कैगा ए.पी.पी. य.ू -3,4 500 क(cid:19)4ीय एस.आर.-के.ए.-04/ सीएच.-6 (िनमा(णीधीन पारेषण .णाली) तिमलनाडु वववव4444लल लल ररूूररूू टटटटीीीी....पपपपीीीी....एएएएसससस.... जजजज..ेे..ेे ववववीीीी.... ((((एएएएननननटटटटीीीीपपपपीीीीससससीीीी----टटटटीीीीएएएएननननईईईईबबबबीीीी)))) 500 क(cid:19)4ीय एस.आर.-टी.एन.-01/ सीएच.-6 यययय--ूू--ूू 1111 (िनमा(णीधीन पारेषण .णाली) ननननववेेववेे ललेेललेे ीीीी टटटटीीीी....पपपपीीीी....एएएएसससस....।।।।।।।। यययय--ूू--ूू 1111 ((((एएएएननननएएएएललललससससीीीी)))) 250 क(cid:19)4ीय एस.आर.-टी.एन.-02/ सीएच.-6 ककककुुुुडडडडननननककककुुुुललललमममम एएएएटटटटााााििििममममकककक (cid:12)(cid:12)(cid:12)(cid:12)टट टट ेे..ेे..----।।।। 2000 क(cid:19)4ीय एस.आर.-टी.एन.-03/ सीएच.-6 ननननााााथथथथ !! !!चचचच55ेे55ेे नन नन ैै ैै टटटटीीीी....पपपपीीीी....एएएएसससस.... 1200 रा2य एस.आर.-टी.एन.-04/ सीएच.-6 (12वd पंच वषCय योजना के िलए बढ़ा दी गई) (िनमा(णीधीन पारेषण .णाली) ममममेeेeेeेeटटटटूूूूरररर टटटटीीीी....पपपपीीीी....एएएएसससस.... (cid:12)(cid:12)(cid:12)(cid:12)टट टट ेेजजेेजज ।।।।।।।।।।।। (12वd पंच वषCय 600 रा2य एस.आर.-टी.एन.-06/ सीएच.-6 योजना के िलए बढ़ा दी गई) 6666....8888....4444 पपपपववूूववूू TTTT (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे पपपपूवूवूवूवTTTT (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे मममम (cid:27)(cid:27) (cid:27)(cid:27)(cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी ससससववंंववंं धधधधनन!!नन!! ययययोोोोजजजजननननााााएएएए ंं ंं :::: (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी ससससववंंववंं धधधधनन!!नन!! ययययोोोोजजजजननननाााा पपपपााााररररेेेेषषषषणणणण (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी हहहहततेेततेे ुु ुु ससससाााा((((ररररणणणणीीीी ससससaaंंaaंं यय यय ाााा ई.आर.एस.एस.एस. -IX ई.आर.-आई.एस.-01/ सीएच.-6 (cid:1)ु(cid:3)ट ककककोोोोईईईई ववववधधैैधधैै (cid:12)(cid:12)(cid:12)(cid:12)ललललकककक ननननहहहह(cid:16)(cid:16)(cid:16)(cid:16) ई.आर.एस.एस.एस. -X ई.आर !!!! .... (cid:1)ु(cid:3)ट ककककोोोोईईईई ववववधधैैधधैै (cid:12)(cid:12)(cid:12)(cid:12)ललललकककक ननननहहहह(cid:16)(cid:16)(cid:16)(cid:16) ई.आर.एस.एस.एस. -XI ई.आर !!!! .... पपपपूवूवूवूवTTTT (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे मममम (cid:27)(cid:27) (cid:27)(cid:27)िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथतततत उउउउDDDDपप पप ााााददददनननन पपपप((((ररररययययोोोोजजजजननननााााUUUU हहहहततेेततेे ुु ुुएएएए....टटटटीीीी....एएएएसससस.... रररराााा""""यय यय जजजजहहहहbbbb उउउउDDDDपप पप ााााददददनननन पपपप((((ररररययययोोोोजजजजननननाााा िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथतततत हहहह ैै ैै आआआआईईईई....ससससीीीी.... (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे पपपपााााररररेेेेषषषषणणणण (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी हहहहततेेततेे ुु ुुससससाााा((((ररररणणणणीीीी ((((ममममगगेेगगेे ााााववववााााटटटट)))) ससससaaंंaaंं यय यय ाााा पपपपिििि````मममम बबबबंगंगंगंगाााालललल ((((टटटट(cid:12)(cid:12)(cid:12)(cid:12)तत तत ाााा ललललोोोो डडडडममैैममैै IV (एएएएनननन....एएएएचचचच....पपपपीीीी....ससससीीीी....) (12वd पंच 160 क(cid:19)4ीय (cid:1)ु(cid:3)ट !!!! ककककोोोोईईईई ववववधधैैधधैै (cid:12)(cid:12)(cid:12)(cid:12)ललललकककक ननननहहहह(cid:16)(cid:16)(cid:16)(cid:16) .... वषCय योजना के िलए बढ़ा दी गई) (िनमा(णीधीन पारेषण .णाली) ((((टटटट(cid:12)(cid:12)(cid:12)(cid:12)तत तत ाााा ललललोोोो डडडडममैैममैै III 132 क(cid:19)4ीय (cid:1)ु(cid:3)ट !!!! ककककोोोोईईईई ववववधधैैधधैै (cid:12)(cid:12)(cid:12)(cid:12)ललललकककक ननननहहहह(cid:16)(cid:16)(cid:16)(cid:16) .... (12वd पंच वषCय योजना के िलए बढ़ा दी गई) (िनमा(णीधीन पारेषण .णाली) मेिजया टी.पी.एस. फेज ।। (डी.वी.सी.) 1000 क(cid:19)4ीय (cid:1)ु(cid:3)ट !!!! ककककोोोोईईईई ववववधधैैधधैै (cid:12)(cid:12)(cid:12)(cid:12)ललललकककक ननननहहहह(cid:16)(cid:16)(cid:16)(cid:16) .... दगु ा(पुर टी.पी.एस. (डी.वी.सी.) 1000 क(cid:19)4ीय (cid:1)ु(cid:3)ट !!!! ककककोोोोईईईई ववववधधैैधधैै (cid:12)(cid:12)(cid:12)(cid:12)ललललकककक ननननहहहह(cid:16)(cid:16)(cid:16)(cid:16) .... (िनमा(णीधीन पारेषण .णाली) सांताडीह टी.पी.पी. (ड(cid:2)(cid:4) य.ू बी.पी.डी.सी.एल.) य.ू 5,6 500 रा2य (cid:1)ु(cid:3)ट !!!! ककककोोोोईईईई ववववधधैैधधैै (cid:12)(cid:12)(cid:12)(cid:12)ललललकककक ननननहहहह(cid:16)(cid:16)(cid:16)(cid:16) .... सागरिडPह ी-I एवं II 600 रा2य (cid:1)ु(cid:3)ट !!!! ककककोोोोईईईई ववववधधैैधधैै (cid:12)(cid:12)(cid:12)(cid:12)ललललकककक ननननहहहह(cid:16)(cid:16)(cid:16)(cid:16) .... झझझझााााररररखखखखंडंडंडंड कोडमा( टी.पी.एस. य-ू 1 (डी.वी.सी.) 500 क(cid:19)4ीय (cid:1)ु(cid:3)ट !!!! ककककोोोोईईईई ववववधधैैधधैै (cid:12)(cid:12)(cid:12)(cid:12)ललललकककक ननननहहहह(cid:16)(cid:16)(cid:16)(cid:16) .... मैथन आर.बी.टी.पी.एस. (डी.वी.सी. एवं टाटा का 1050 रा2य (cid:1)ु(cid:3)ट !!!! ककककोोोोईईईई ववववधधैैधधैै (cid:12)(cid:12)(cid:12)(cid:12)ललललकककक ननननहहहह(cid:16)(cid:16)(cid:16)(cid:16) ....524 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] रररराााा""""यय यय जजजजहहहहbbbb उउउउDDDDपप पप ााााददददनननन पपपप((((ररररययययोोोोजजजजननननाााा िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथतततत हहहह ैै ैै आआआआईईईई....ससससीीीी.... (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे पपपपााााररररेेेेषषषषणणणण (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी हहहहततेेततेे ुु ुुससससाााा((((ररररणणणणीीीी ((((ममममगगेेगगेे ााााववववााााटटटट)))) ससससaaंंaaंं यय यय ाााा संयु(cid:25)त उप)म) ओओओओििििडडडडशशशशाााा ,ट रलाइट टी.पी.पी. (य.ू -1,2,3) 1800 आईपीपी. सीएच .-7 म(cid:19) पारेषण .णाली हते ु (केवल एलआईएलओ sय व,थ ा पूरी कV गई) सा(cid:10)रणी पू.8े-ओ.आर.-01, पू.8े-ओ.आर.-02, पू.8े-ओ.आर.-03, पू.8े-ओ.आर.-04, पू.8े-ओ.आर.-05 ििििबबबबहहहहाााारररर बाड -। (य-ू 1,2,3) 1980 क(cid:19)4ीय (cid:1)ु(cid:3)ट !!!! ककककोोोोईईईई ववववधधैैधधैै (cid:12)(cid:12)(cid:12)(cid:12)ललललकककक ननननहहहह(cid:16)(cid:16)(cid:16)(cid:16) .... (12वd पंच वषCय योजना के िलए बढ़ा दी गई) 6666....8888....5555 उउउउDDDDतत तत रररर पपपपववूूववूू TTTT (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे उउउउDDDDतत तत रररर पपपपववूूववूू TTTT (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे मममम (cid:27)(cid:27) (cid:27)(cid:27)िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथतततत उउउउDDDDपपपप ााााददददनननन पपपप((((ररररययययोोोोजजजजननननााााUUUU हहहहततेेततेे ुु ुुएएएए....टटटटीीीी....एएएएसससस रररराााा""""यय यय जजजजहहहहbbbb उउउउDDDDपप पप ााााददददनननन पपपप((((ररररययययोोोोजजजजननननाााा िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथतततत हहहह ैै ैै आआआआईईईई....ससससीीीी.... (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे पपपपााााररररेेेेषषषषणणणण (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी हहहहततेेततेे ुु ुुससससाााा((((ररररणणणणीीीी ((((ममममगगेेगगेे ााााववववााााटटटट)))) ससससaaंंaaंं यय यय ाााा ममममघघेेघघेे ााााललललयययय ललललशशेेशशेे ककककाााा 9999ममममटटटटडडडडूूूू ----।।।। एएएएचचचच....ईईईई....पपपपीीीी.... 84 रा2य एनईआर-एम.जी.-01/ सीएच-6 6666....8888....6666 अअअअततंंततंं रररर----(cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ीीीीयययय पपपपााााररररेेेेषषषषणणणण ययययोोोोजजजजननननााााएएएए ंं ंं :::: (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी ससससववंंववंं धधधधनन!!नन!! ययययोोोोजजजजननननाााा पपपपााााररररेेेेषषषषणणणण (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी हहहहततेेततेे ुु ुुससससाााा((((ररररणणणणीीीी ससससaaंंaaंं यय यय ाााा पपपपूवूवूवूव--!!--!! पपपपिििि````मममम पपपपााााररररेेेेषषषषणणणण ममममाााागगगग !! !!ससससववववंंंं धधधधनन!!नन!! आईआर-एसएस/01/ सीएच.-6 अअअअननननबबुुबबुु धधंंधधंं –––– 6666कककक वववव(cid:2)(cid:2)(cid:2)(cid:2) पपपपचचंंचचंं ववववषषषष(cid:7)(cid:7)(cid:7)(cid:7)यययय ययययोोोोजजजजननननाााा कककक(cid:15)(cid:15)(cid:15)(cid:15) (cid:16)(cid:16)(cid:16)(cid:16)गगगगिििितततत औऔऔऔरररर ककककाााायययय(cid:23)(cid:23)(cid:22)(cid:22)(cid:23)(cid:23)(cid:22)(cid:22) मममम अअअअननननबबुुबबुु धधंंधधंं –––– 11111111 अअअअननननबबुुबबुु धधंंधधंं - 6666....1111 2222000000007777----00008888 ककककेेेे ददददौौौौरररराााानननन पपपपााााररररेेेेषषषषणणणण (cid:30)(cid:30)(cid:30)(cid:30)णणणणििििललललयययय,,,, कककक.... ववववििृृििृृ BBBB >>>>.... पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन,,,, ककककाााा ननननाााामममम ससससYYYYककककटटटट कककक.... VVVV>>>>ययययाााा5555वव वव ययययनननन ललललााााइइइइनननन कककक.... पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा ममममााााहहहह सससस..ंं..ंं ससससaaंंaaंं यय यय ाााा एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ललललबबंंबबंं ााााईईईई ((((ससससीीीीककककेेेेएएएएमममम)))) IIII.... 777766665555 ककककेेेेववववीीीी ललललााााइइइइनननन (cid:27)(cid:27) (cid:27)(cid:27) 1111 िसपत - िसवनी लाइन 1 एस/सी पावरिSड 351 िसतंबर-07¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 525 >>>>.... पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन,,,, ककककाााा ननननाााामममम ससससYYYYककककटटटट कककक.... VVVV>>>>ययययाााा5555वव वव ययययनननन ललललााााइइइइनननन कककक.... पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा ममममााााहहहह सससस..ंं..ंं ससससaaंंaaंं यय यय ाााा एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ललललबबंंबबंं ााााईईईई ((((ससससीीीीककककेेेेएएएएमममम)))) ववववषषषष (cid:3)(cid:3) (cid:3)(cid:3)ककककेेेे ददददौौौौरररराााानननन पपपपररूूररूू ीीीी ततततररररहहहह सससस ेे ेेपपपपररूूररूू ीीीी कककक(cid:18)(cid:18)(cid:18)(cid:18) गगगगईईईई ककककुुुुलललल ससससीीीीककककेेेेएएएएमममम 777766665555 ककककेेेेववववीीीी 351 ललललााााइइइइनननन कककक(cid:18)(cid:18)(cid:18)(cid:18) ((((अअअअििििखखखखलललल भभभभााााररररतततत (cid:23)(cid:23)(cid:23)(cid:23)तत तत रररर पपपपरररर)))) >>>>.... पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन,,,, ककककाााा ननननाााामममम ससससYYYYककककटटटट कककक.... VVVV>>>>ययययाााा5555वव वव ययययनननन ललललााााइइइइनननन कककक.... पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा सससस..ंं..ंं ससससaaंंaaंं यय यय ाााा एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ललललबबंंबबंं ााााईईईई ((((ससससीीीीककककेेेेएएएएमममम)))) ममममााााहहहह IIIIIIII.... 444400000000 ककककेेेेववववीीीी ललललााााइइइइनननन (cid:27)(cid:27) (cid:27)(cid:27)((((ससससीीीीएएएएसससस)))) 1 बिलया – लखनऊ डी/सी पावरिSड 632 अ.ैल-07 2 मैथन – रांची डी/सी पावरिSड 400 मई-07 3 मौजूदा Gव!ाचल-कानपुर लाइन डी/सी पावरिSड 6 मई-07 के िनकट लगभग 2.3 7कमी पर Gसगरौली से लाइन . 4 गूटी - रैचूर डी/सी पावरिSड 294 मई-07 5 Gव!ाचल – कोरबा एस/सी पावरिSड 291 जून-07 6 लखनऊ – बरेली डी/सी पावरिSड 511 जुलाई -07 7 बरेली ि,थत बरेली –मंदौला का 2 x डी/सी पावरिSड 37 जुलाई -07 एलआईएलओ 8 सतना–बीना स6कट I & II डी/सी पर पावरिSड 545 अग,त -07 एस/सी 9 बरेली म(cid:19) लखनऊ –मुरादाबाद का डी/सी पावरिSड 22 अग,त -07 एलआईएलओ 10 7द(cid:18)ल ी म(cid:19) दादरी - ब(cid:18)ल भगढ़ का डी/सी पावरिSड 60 िसतंबर-07 एलआईएलओ 11 िसवनी म(cid:19) िभलाई - सतपुरा डी/सी पावरिSड 4 िसतंबर-07 एस/सी का एलआईएलओ 12 िबहार शरीफ - बिलया ((cid:25)व ाद) डी/सी पर पावरिSड 484 जनवरी-08 एस/सी स6कट-I 13 लखनऊ म(cid:19) सु(cid:18)त ानपुर –लखनऊ डी/सी पावरिSड 42 7दसDब र-07 का एलआईएलओ 14 फतेहाबाद म(cid:19) िहसार-मोगा का डी/सी पावरिSड 59 7दसDब र-07 एलआईएलओ स6कट 15 नागदा - दहे गाम डी/सी पावरिSड 664 7दसDब र-07 16 रायगढ़ म(cid:19) राउरकेला –रायपुर का डी/सी पावरिSड 37 7दसDब र-07 एलआईएलओ 17 भाटापारा म(cid:19) कोरबा –रायपुर डी/सी पावरिSड 5 7दसDब र-07 एस/सी का एलआईएलओ526 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] >>>>.... पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन,,,, ककककाााा ननननाााामममम ससससYYYYककककटटटट कककक.... VVVV>>>>ययययाााा5555वव वव ययययनननन ललललााााइइइइनननन कककक.... पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा सससस..ंं..ंं ससससaaंंaaंं यय यय ाााा एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ललललबबंंबबंं ााााईईईई ((((ससससीीीीककककेेेेएएएएमममम)))) ममममााााहहहह 18 बीना - नागदा डी/सी पावरिSड 662 7दसDब र-07 19 नर(cid:19)4 - दवनगीर डी/सी पावरिSड 310 जनवरी-08 20 लुिधयान- जालंधर एस/सी पावरिSड 85 माच(-08 21 िसवनी – खंडवा ((cid:25)व ाद) डी/सी पावरिSड 703 माच(-08 22 खंडवा – रायगढ़ स6कट II डी/सी पावरिSड 220 माच(-08 23 वेमािगरी सब-,ट ेशन म(cid:19) डी/सी पावरिSड 156 माच(-08 गािजयाबाद-िवजयवाडा 400 केवी डी/सी के दोन^ स6कट^ का एलआईएलओ 24 मालेरकोटला – लुिधयाना एस/सी पावरिSड 36 माच(-08 25 रायगढ़ म(cid:19) सरदार सरोबर-नागदा डी/सी पावरिSड 16 माच(-08 के दोन^ स6कट^ का एलआईएलओ 26 ती,त ा V – िसलीगडी स6कट I एस/सी पावरिSड 114 माच(-08 27 ितWनेवेली म(cid:19) मदरु ई (पीजी) – डी/सी पावरिSड 106 माच(-08 ि9व(cid:19)4म (पीजी) के पहले स6कट का एलआईएलओ 28 आरएपीपी 5&6 – कंकरोली डी/सी पावरिSड 397 माच(-08 ककककुुुुलललल 444400000000 ककककेेेेववववीीीी ललललााााइइइइनननन कककक.... 6666888899998888 ((((ससससीीीीएएएएसससस)))) 222222220000 ककककेेेेववववीीीी ललललााााइइइइनननन (cid:27)(cid:27) (cid:27)(cid:27)((((कककक(cid:27)(cid:27)(cid:27)(cid:27)CCCCीीीीयययय (cid:7)(cid:7)(cid:7)(cid:7)3333ेेेे )))) 1 ऊंचाहार- राबरेली एस/सी पावरिSड 43 जुलाई -07 2 रायबरेली म(cid:19) ऊंचाहार-लखनऊ के डी/सी पावरिSड 12 जुलाई -07 स6कट-। का एलआईएलओ 3 एमटीपीएस-दगु ा(पुर डी/सी डीवीसी 84 अग,त -07 4 रांची म(cid:19) पतरात-ू चांिडल डी/सी 2xडी/सी पावरिSड 29 िसतंबर-07 का एलआईएलओ ककककुुुुलललल 222222220000 ककककेेेेववववीीीी ललललााााइइइइनननन कककक.... ((((ससससीीीी)))) 111166668888 ककककुुुुलललल ससससीीीीएएएएसससस ((((ककककेेेेववववलललल 777766665555 7777444411117777 ++++444400000000++++222222220000++++111133332222 ककककेेेेववववीीीी पपपपीीीीजजजजीीीी)))) >>>>.... पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन,,,, ककककाााा ननननाााामममम ससससYYYYककककटटटट कककक.... VVVV>>>>ययययाााा5555वव वव ययययनननन ललललााााइइइइनननन कककक.... पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा सससस..ंं..ंं ससससaaंंaaंं यय यय ाााा एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ललललबबंंबबंं ााााईईईई ((((ससससीीीीककककेेेेएएएएमममम)))) ममममााााहहहह रररराााा""""यय यय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे 444400000000 ककककेेेेववववीीीी ललललााााइइइइनननन (cid:27)(cid:27) (cid:27)(cid:27) 1 पुWिलया पDप ,ट ोरेज- डी/सी पिZम बंगाल 418 अ.ैल-07 आरामबाग¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 527 >>>>.... पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन,,,, ककककाााा ननननाााामममम ससससYYYYककककटटटट कककक.... VVVV>>>>ययययाााा5555वव वव ययययनननन ललललााााइइइइनननन कककक.... पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा सससस..ंं..ंं ससससaaंंaaंं यय यय ाााा एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ललललबबंंबबंं ााााईईईई ((((ससससीीीीककककेेेेएएएएमममम)))) ममममााााहहहह 2 पुWिलया पDप ,ट ोरेज-दगु ा(पुर एस/सी पिZम बंगाल 370 अ.ैल-07 स6कट 1 3 चाकन एमआईडीसी म(cid:19) एस/सी महाराJ(cid:26) 4 मई-07 लोनीखंड-पडघे डायवज(न 4 दघे म (पीजीसीआईएल)- डी/सी गुजरात 125 जुलाई -07 रणछोड़पुरा 5 अखकोल म(cid:19) झानूर-वापी का डी/सी गुजरात 28 नवDब र-07 एलआईएलओ 6 अकोला म(cid:19) भुसावल-कोराडी के डी/सी महाराJ(cid:26) 80 जनवरी-08 पहले स6कट का एलआईएलओ ककककुुुुलललल 444400000000 ककककेेेेववववीीीी ललललााााइइइइनननन (cid:24)(cid:24) (cid:24)(cid:24)((((ससससबबबब---- 1111000022225555 (cid:23)(cid:23)(cid:23)(cid:23)टट ट ट ेेशशेेशशनननन)))) 222222220000 ककककेेेेववववीीीी ललललााााइइइइनननन (cid:27)(cid:27) (cid:27)(cid:27)((((रररराााा""""यय यय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे )))) 1 िसWसरे ी म(cid:19) एस पी कोइल- डी/सी तिमलनाडु 20 अ.ैल-07 थारामिण का एलआईएलओ 2 ममीदीप(cid:18)ल ी-चं4यंगुKा से डी/सी आं” .दशे 1 अ.ैल-07 हदै राबाद एअरपोट( कV टैप लाइन 3 आिसफनगर-करवान 245 केवी आं” .दशे 3 अ.ैल-07 ए(cid:25)स एलपीई यूजी केिबल 4 मादा – बारमर डी/सी राज,थ ान 258 अ.ैल-07 5 सतारा एमआईडीसी - व(cid:19)कुआवड े डी/सी महाराJ(cid:26) 30 अ.ैल-07 6 िसवनी 400 केवी (पीजी)- डी/सी मcय .दशे 9 मई-07 िसवनी(एमपी) 7 aलकरवाडी म(cid:19) थे•यरू -जेझुरी का डी/सी महाराJ(cid:26) 38 मई-07 एलआईएलओ 8 नाइक-कलवा-III&IV डी/सी महाराJ(cid:26) 2 जून-07 9 Gखनवसार - भोपालगढ़ एस/सी राज,थ ान 36 जून-07 10 िबरGसगपुर-जबलपुर डी/सी मcय .दशे 274 जून-07 11 िबरGसहपुर सब-,ट ेशन म(cid:19) डी/सी मcय .दशे 12 जून-07 िबरGसहपुर (टी)- िबरGसहपुर(एच) के दसू रे स6कट का एलआईएलओ 12 डी/सी पर कनहान-उमरेद एस/सी महाराJ(cid:26) 50 जून-07 एस/सी528 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] >>>>.... पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन,,,, ककककाााा ननननाााामममम ससससYYYYककककटटटट कककक.... VVVV>>>>ययययाााा5555वव वव ययययनननन ललललााााइइइइनननन कककक.... पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा सससस..ंं..ंं ससससaaंंaaंं यय यय ाााा एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ललललबबंंबबंं ााााईईईई ((((ससससीीीीककककेेेेएएएएमममम)))) ममममााााहहहह 13 िबरGसहपुर सब-,ट ेशन म(cid:19) 2xडी/सी मcय .दशे 23 जुलाई -07 िबरGसहपुर (टी)-नौरोजाबाद डी/सी का एलआईएलओ 14 ने(cid:18)ल ौर म(cid:19) ने(cid:18)ल ौर – रेनीगंटा का डी/सी आं” .दशे 20 जुलाई -07 एलआईएलओ 15 कामावरापुकोटा म(cid:19) िव2ज वे ारम् डी/सी आं” .दशे 46 जुलाई -07 का एलआईएलओ 16 िमवाडी एसड(cid:4)(cid:18) य ू. एसटीएन – डी/सी तिमलनाडु 19 जुलाई -07 पो3न ापुरम स6कट-I 17 िहसार (बीबीएमबी)-िहसार एस/सी ह(cid:10)रयाणा 1.5 अग,त -07 आईए (िuतीय स6कट) 18 आसनसोल म(cid:19) एसटीपीएस – डी/सी पिZम बंगाल 80 अग,त -07 दगु ा(पुर स6कट । का एलआईएलओ l 19 डी/सी पर छलाकुतC- एस/सी आं” .दशे 43 अग,त -07 क^डाम(cid:18)ल ेप(cid:18)ल ी एस/सी 20 मामीदीप(cid:18)ल ी-ए–दमू ैलारम एस/सी आं” .दशे 63 अग,त -07 दसू री स6कट H(cid:26)Gगग 21 नीलामंगला-डीबी पुरा डी/सी कना(टक 33 अग,त -07 22 िसरसी एसड(cid:4)(cid:18) य ू. एसटीएन पर डी/सी कना(टक 13 अग,त -07 सरावती-aबली का एलआईएलओ 23 मंडावर म(cid:19) दउआ-भाटापारा का डी/सी राज,थ ान 16 िसतंबर-07 एलआईएलओ 24 बरGसघर-नागपुर एस/सी राज,थ ान 104 िसतंबर-07 25 †ीडूगं रगढ़ म(cid:19) रतनगढ़-बाकानेर डी/सी राज,थ ान 5 िसतंबर-07 एलआईएलओ 26 सगर7दघी-गोकरना डी/सी पिZम बंगाल 90 िसतंबर-07 27 जेटीपी-रायगढ़ औ!ोिगक इ,ट ेट डी/सी छ&त ीसगढ़ 40 िसतंबर-07 (पनजीपा9ा) 28 डी/सी पर तालाप(cid:18)ल ी-छलाकुतC एस/सी आं” .दशे 26 िसतंबर-07 एस/सी 29 िमवाडी एसड(cid:4)(cid:18) य ू. एसटीएन.- डी/सी तिमलनाडु 19 िसतंबर-07 पो3न ापूरम स6कट-II 30 हदाला म(cid:19) राजकोट-मोरबी डी/सी गुजरात 1 िसतंबर-07 एलआईएलओ 31 राजकोट-मोरबी डी/सी गुजरात 145 िसतंबर-07¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 529 >>>>.... पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन,,,, ककककाााा ननननाााामममम ससससYYYYककककटटटट कककक.... VVVV>>>>ययययाााा5555वव वव ययययनननन ललललााााइइइइनननन कककक.... पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा सससस..ंं..ंं ससससaaंंaaंं यय यय ाााा एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ललललबबंंबबंं ााााईईईई ((((ससससीीीीककककेेेेएएएएमममम)))) ममममााााहहहह 32 इंदौर (पूव)( म(cid:19) इंदौर-दवे ास डी/सी मcय .दशे 1 िसतंबर-07 एलआईएलओ 1 स6कट 33 भटापारा (सुहले ा) -बेमेतारा ड ी / स ी छ & त ी स ग ढ़ 89 अ(cid:25)ट ूबर-07 34 भटापारा (सुहले ा) –महामुंद डी/सी छ&त ीसगढ़ 124 अ(cid:25)ट ूबर-07 35 मेिजया- दगु ा(पुर एस/सी पिZम बंगाल 64 अ(cid:25)ट ूबर-07 36 यमुनानगर टीपीपी-जो(cid:10)रयन डी/सी ह(cid:10)रयाणा 22 अ(cid:25)ट ूबर-07 (यमुनानगर) 37 यमुनानगर टीपीपी – सलमे पुर डी/सी ह(cid:10)रयाणा 86 अ(cid:25)ट ूबर-07 (िनGसग बाईपास सलेमपुर को जोड़ने वाला) 38 वलूथर सब-,ट ेशन पर अलगर डी/सी तिमलनाडु 193 अ(cid:25)ट ूबर-07 कोइल (उ&त र मदरु ई) – कराईकुडी का एलआईएलओ 39 य>च नय(cid:18)ल ी म(cid:19) िशमोगा-मैसूर डी/सी कना(टक 6 नवDब र-07 एलआईएलओ 40 महारानी बाग-लोदी रोड डी/सी पर 7द(cid:18)ल ी 1.2 7दसDब र-07 स6कट-1 एस/सी 41 कैलाश चं4पुर – पदमानवपुर डी/सी उड़ीसा 68 7दसDब र-07 42 पदमानवपुर-बालासौर स6कट-1 डी/सी उड़ीसा 22 7दसDब र-07 43 उरसे म(cid:19) अपता-Gछदवाडा डी/सी महाराJ(cid:26) 22 7दसDब र-07 एलआईएलओ 44 Sेटर नोएडा-नोएडा (पी) डी/सी पर उ&त र .दशे 27 7दसDब र-07 एस/सी स6कट-1 45 कोरबा (पुव)( डीपीएम-भाटापारा डी/सी छ&त ीसगढ़ 284 7दसDब र-07 (सुहले ा) 46 अमलनेर म(cid:19) घुले ड^डइ>छ ा डी/सी महाराJ(cid:26) 61 7दसDब र-07 एलआईएलओ 47 तलंगड-े कागल पांच िसतारा डी/सी पर महाराJ(cid:26) 4 7दसDब र-07 एमआईडीसी एम/सी 48 पुलाकुतC म(cid:19) रामागुंडम-वारंगल डी/सी आं” .दशे 21 7दसDब र-07 एलआईएलओ 49 ने(cid:18)ल ौर म(cid:19) ने(cid:18)ल ौर-रेनीगुंडा का डी/सी आं” .दशे 20 7दसDब र-07 िuतीय एलआईएलओ (400 केवी सब-,ट ेशन)530 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] >>>>.... पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन,,,, ककककाााा ननननाााामममम ससससYYYYककककटटटट कककक.... VVVV>>>>ययययाााा5555वव वव ययययनननन ललललााााइइइइनननन कककक.... पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा सससस..ंं..ंं ससससaaंंaaंं यय यय ाााा एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ललललबबंंबबंं ााााईईईई ((((ससससीीीीककककेेेेएएएएमममम)))) ममममााााहहहह 50 ितWनेवेली म(cid:19) कयाथर – संकनेरी डी/सी तिमलनाडु 44 7दसDब र-07 एलआईएलओ (400 केवी) 51 प(cid:19)Eा म(cid:19) कोरबा – अमरकंटक डी/सी छ&त ीसगढ़ 23 7दसDब र-07 एलआईएलओ (कोटिमकाला) 52 चंपा (बनारी) म(cid:19) कोरबा (पूव() डी/सी छ&त ीसगढ़ 2 7दसDब र-07 डीएसपीएम- भाटापारा (सहु ले ा) िuतीय स6कट का एलआईएलओ 53 महारानी बाग-लोदी रोड स6कट- डी/सी पर 7द(cid:18)ल ी 1.2 जनवरी-08 एस/सी II 54 राज(cid:19)4 ,ट ील-िस(cid:18)त रा िuतीय एस/सी छ&त ीसगढ़ 2 जनवरी-08 एस/सी 55 धनकV-अदलसार डी/सी गुजरात 18 जनवरी-08 56 सतारा एमआईडीसी सब-,ट ेशन डी/सी महाराJ(cid:26) 60 जनवरी-08 के िलए मलहारपेठ – वंकुशवाडे का एलआईएलओ 57 कनकपुरा म(cid:19) सोमनह(cid:18)ल ी – टी के डी/सी कना(टक 6 जनवरी-08 ह(cid:18)ल ी एलआईएलओ 58 मालापराDब ा म(cid:19) कोझईकोड- डी/सी केरल 2 जनवरी-08 इडु(cid:25)क V एलआईएलओ 59 घाटघर म(cid:19) Gजदल-वशाला डी/सी महाराJ(cid:26) 0 जनवरी-08 एलआईएलओ (केवल संशोधन uारा) 60 पीजीसीआईएल-नलासोपारा एस/सी महाराJ(cid:26) 4 जनवरी-08 61 अदलसार-बाला डी/सी गुजरात 22 जनवरी-08 62 बरसाना म(cid:19) नैनीखखर – डी/सी गुजरात 7 जनवरी-08 िशवलखा डी/सी का एलआईएलओ 63 दनू ी के िलए एलआईएलओ डी/सी राज,थ ान 4 फरवरी-08 64 कानन म(cid:19) खपेरखेडा – भंडारा डी/सी महाराJ(cid:26) 20 फरवरी-08 दसू रे स6कट का एलआईएलओ 65 भरथाना म(cid:19) परी8ा-सफाई का डी/सी उ&त र .दशे 8 फरवरी-08 एलआईएलओ 66 वे(cid:18)त ूर 400 केवी सब-,ट ेशन - डी/सी आं” .दशे 66 माच(-08 जुराला¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 531 >>>>.... पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन,,,, ककककाााा ननननाााामममम ससससYYYYककककटटटट कककक.... VVVV>>>>ययययाााा5555वव वव ययययनननन ललललााााइइइइनननन कककक.... पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा सससस..ंं..ंं ससससaaंंaaंं यय यय ाााा एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ललललबबंंबबंं ााााईईईई ((((ससससीीीीककककेेेेएएएएमममम)))) ममममााााहहहह 67 शादनगर म(cid:19) मिमदीप(cid:18)ल ी – डी/सी आं” .दशे 36 माच(-08 ऐ–दमू ैलारम् से एलआईएलओ 68 7दचप(cid:18)ल ी 400 केवी 7दचप(cid:18)ल ी डी/सी आं” .दशे 8 माच(-08 69 सरावती उ&प ादन ,ट ेशन- एम/सी कना(टक 28 माच(-08 दगु ाडीमाने 70 ितWनेलवेली (400 केवी)- डी/सी पर तिमलनाडु 31 माच(-08 एस/सी वीरानम 71 कोडीकुरेची-छे(cid:25)क ानूरानी एस/सी तिमलनाडु 31 माच(-08 72 िथWव(cid:18)ल ी–नर(cid:19)4पुर चंढ़ाका डी/सी उड़ीसा 750 माच(-08 73 आईबी थम(ल –बुघीपडार डी/सी उड़ीसा 52 माच(-08 (िuतीय डी/सी) 74 िबहनूपुर म(cid:19) टीपी – आरामबाग 2xडी/सी पिZम बंगाल 4 माच(-08 एलआईएलओ 75 म(cid:19)धासल म(cid:19) भंजनगर – चंडक का डी/सी उड़ीसा 12 माच(-08 एलआईएलओ 76 गुWर म (cid:19) िभलाई-बंसूर (िuतीय डी/सी छ&त ीसगढ़ 14 माच(-08 स6कट) का एलआईएलओ 77 भैती (पीजी)-उरई एस/सी उ&त र .दशे 90 माच(-08 78 पटना पीजी म(cid:19) फतूहा-खगौल डी/सी िबहार 20 माच(-08 एलआईएलओ ककककुुुुलललल 222222220000 ककककेेेेववववीीीी ललललााााइइइइनननन (cid:27)(cid:27) (cid:27)(cid:27)((((ससससबबबब---- 4444000000001111 (cid:12)(cid:12)(cid:12)(cid:12)टट ट ट ेेशशेेशशनननन)))) ककककुुुुलललल ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट टट ेेेेशशशशनननन ((((444400000000++++222222220000)))) 5555000022226666 ककककेेेेववववीीीी ववववषषषष (cid:3)(cid:3) (cid:3)(cid:3)ककककेेेे ददददौौौौरररराााानननन पपपपररूूररूू ीीीी कककक(cid:18)(cid:18)(cid:18)(cid:18) गगगगईईईई 444400000000 ककककेेेेववववीीीी ललललााााइइइइनननन(cid:26)(cid:26)(cid:26)(cid:26) कककक(cid:18)(cid:18)(cid:18)(cid:18) ((((अअअअििििखखखखलललल भभभभााााररररततततीीीीयययय 7777999922223333 (cid:23)(cid:23)(cid:23)(cid:23)तत तत रररर पपपपरररर)))) ककककुुुुलललल ससससीीीीककककेेेेएएएएमममम ववववषषषष (cid:3)(cid:3) (cid:3)(cid:3)ककककेेेे ददददौौौौरररराााानननन पपपपररूूररूू ीीीी कककक(cid:18)(cid:18)(cid:18)(cid:18) गगगगईईईई 222222220000 ककककेेेेववववीीीी ललललााााइइइइनननन(cid:26)(cid:26)(cid:26)(cid:26) कककक(cid:18)(cid:18)(cid:18)(cid:18) ((((अअअअििििखखखखलललल भभभभााााररररततततीीीीयययय 4444111166669999 (cid:23)(cid:23)(cid:23)(cid:23)तत तत रररर पपपपरररर)))) ककककुुुुलललल ससससीीीीककककेेेेएएएएमममम 2222000000007777----00008888 ककककेेेे ददददौौौौरररराााानननन पपपपररूूररूू ेेेे VVVVककककएएएए गगगगएएएए ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट टट ेेेेशशशशनननन >>>>....सससस..ंं..ंं ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट ट ट ेेशशेेशशनननन ववववोोोो4444टट टट ेेजजेेजज अअअअननननपपुुपपुु ाााातततत VVVV>>>>ययययाााा5555वव वव ययययनननन (cid:7)(cid:7)(cid:7)(cid:7)ममममतततताााा पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा ममममााााहहहह ((((ककककेेेेववववीीीी////ककककेेेेववववीीीी)))) एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ((((एएएएमममम डडडड(cid:2)(cid:2)(cid:2)(cid:2)44 44 यय यय ूू ूू //// एएएएममममववववीीीीएएएए)))) IIIIIIII.... 777766665555 ककककेेेेववववीीीी ((((ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट टट ेेेेशशशशनननन)))) 1 िसवनी सब ,ट ेशन 765/400 पावरिSड 1500 िसतंबर-07532 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] >>>>....सससस..ंं..ंं ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट ट ट ेेशशेेशशनननन ववववोोोो4444टट टट ेेजजेेजज अअअअननननपपुुपपुु ाााातततत VVVV>>>>ययययाााा5555वव वव ययययनननन (cid:7)(cid:7)(cid:7)(cid:7)ममममतततताााा पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा ममममााााहहहह ((((ककककेेेेववववीीीी////ककककेेेेववववीीीी)))) एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ((((एएएएमममम डडडड(cid:2)(cid:2)(cid:2)(cid:2)44 44 यय यय ूू ूू //// एएएएममममववववीीीीएएएए)))) ( 7x ( 500-333 )) 2 िसवनी नया (3x500) 765/400 पावरिSड 1500 माच(-08 3 िसवनी िव,त ार 765/400 पावरिSड 1500 माच(-08 (3x500) >>>>....सससस..ंं..ंं ववववोोोो4444टट टट ेेजजेेजज (cid:7)(cid:7)(cid:7)(cid:7)ममममतततताााा पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा ममममााााहहहह ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट ट ट ेेशशेेशशनननन अअअअननननपपुुपपुु ाााातततत VVVV>>>>ययययाााा5555वव वव ययययनननन ((((एएएएमममम डडडड(cid:2)(cid:2)(cid:2)(cid:2)44 44 यय यय ूू ूू //// एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ((((ककककेेेेववववीीीी////ककककेेेेववववीीीी एएएएममममववववीीीीएएएए)))) )))) IIIIllllllll.... 444400000000 ककककेेेेववववीीीी ((((ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट ट ट ेेशशेेशशनननन)))) ((((ससससीीीीएएएएसससस)))) 1 रांची (आईसीटी -1) 400/220 पावरिSड 315 मई-07 2 Pव ािलयर (नया) 400/220 पावरिSड 315 मई-07 3 वगूरा (9तीय ) (3x105) 400/220 पावरिSड 315 जून-07 4 मोगा (िव,त ार) 400/220 पावरिSड 315 जून-07 5 कुड*प ा िव,त ार 400/220 पावरिSड 315 अग,त -07 6 7द(cid:18)ल ी (जीआई) 400/220 पावरिSड 630 िसतंबर-07 7 गूटी िव,त ार 400/220 पावरिSड 315 िसतंबर-07 8 कोलार िव,त ार 400/220 पावरिSड 500 िसतंबर-07 9 गजुवाका िव,त ार , 400/220 पावरिSड 315 अ(cid:25)ट ूबर-07 10 रांची (आईसीटी-II) 400/220 पावरिSड 315 नवDब र-07 11 फतेहाबाद (नया) आईसीटी-I 400/220 पावरिSड 315 7दसDब र-07 12 पटना िuतीय आईसीटी 400/220 पावरिSड 315 7दसDब र-07 13 रायगढ़ (नया) आईसीटी-I 400/220 पावरिSड 315 7दसDब र-07 14 भाटापारा (नया) 400/220 पावरिSड 315 7दसDब र-07 15 मुनेराबाद िव,त ार 400/220 पावरिSड 315 7दसDब र-07 16 िसवनी आईसीटी-I 400/220 पावरिSड 315 जनवरी-08 17 mD म ाम िव,त ार 400/220 पावरिSड 315 जनवरी-08 18 रायगढ़ (नया) आईसीटी-II 400/220 पावरिSड 315 फरवरी-08 19 िसवनी II आईसीटी 400/220 पावरिSड 315 माच(-08 20 Pव ािलयर (नया) II आईसीटी 400/220 पावरिSड 315 माच(-08 21 अ—तसर (िव,त ार) 400/220 पावरिSड 315 माच(-08 22 राजगढ़ (नया) 400/220 पावरिSड 315 माच(-08 23 िह(cid:10)रयूर िव,त ार 400/220 पावरिSड 315 माच(-08 24 िवजयवाडा िव,त ार 400/220 पावरिSड 315 माच(-08 25 फतेहाबाद आईसीटी- II 400/220 पावरिSड 315 माच(-08 ककककुुुुलललल ((((कककक(cid:27)(cid:27)(cid:27)(cid:27)CCCCीीीीयययय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे )))) 444400000000 8888333377775555 222222220000 ककककेेेेववववीीीी ((((ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट ट ट ेेशशेेशशनननन))))((((ससससीीीीएएएएसससस)))) 1 रायबरेली आईसीटी-I 220/132 पावरिSड 100 िसतंबर-07¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 533 >>>>....सससस..ंं..ंं ववववोोोो4444टट टट ेेजजेेजज (cid:7)(cid:7)(cid:7)(cid:7)ममममतततताााा पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा ममममााााहहहह ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट ट ट ेेशशेेशशनननन अअअअननननपपुुपपुु ाााातततत VVVV>>>>ययययाााा5555वव वव ययययनननन ((((एएएएमममम डडडड(cid:2)(cid:2)(cid:2)(cid:2)44 44 यय यय ूू ूू //// एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ((((ककककेेेेववववीीीी////ककककेेेेववववीीीी एएएएममममववववीीीीएएएए)))) )))) 2 रायबरेली आईसीटी-II 220/132 पावरिSड 100 7दसDब र-07 ककककुुुुलललल ((((कककक(cid:27)(cid:27)(cid:27)(cid:27)CCCCीीीीयययय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे )))) 222222220000 222200000000 ककककुुुुलललल ससससीीीीएएएएसससस ((((777766665555 ++++444400000000++++222222220000)))) ककककेेेेववववीीीी 11113333000077775555 ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट ट ट ेेशशेेशशनननन ववववोोोो4444टट टट ेेजजेेजज (cid:7)(cid:7)(cid:7)(cid:7)ममममतततताााा पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा ममममााााहहहह >>>>....सससस..ंं..ंं अअअअननननपपुुपपुु ाााातततत VVVV>>>>ययययाााा5555वव वव ययययनननन ((((एएएएमममम ((((ककककेेेेववववीीीी////ककककेेेेववववीीीी)))) एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी डडडड(cid:2)(cid:2)(cid:2)(cid:2)44 44 यय यय ूू ूू //// एएएएममममववववीीीीएएएए)))) 444400000000 ककककेेेेववववीीीी ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट टट ेेेेशशशशनननन ((((ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट टट ेेेेशशशशनननन)))) 1 रणछोड़पुरा (वदावी) (िuतीय) 400/220 गुजरात 315 जनवरी-08 2 अलमपथी 400/230 तिमलनाडु 630 जनवरी-08 3 मिमदीप(cid:18)ल ी 400/220 आं” .दशे 315 जनवरी-08 4 7दचप(cid:18)ल ी 400/220 आं” .दशे 630 फरवरी-08 ककककुुुुलललल 444400000000 ककककेेेेववववीीीी ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट टट ेेेेशशशशनननन ((((एएएएससससएएएएसससस)))) 400/220 1111888899990000 222222220000 ककककेेेेववववीीीी ((((ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट ट ट ेेशशेेशशनननन))))((((एएएएससससएएएएसससस)))) 1 िसWसरे ी 230/110 तिमलनाडु 200 अ.ैल-07 2 रािनया (िuतीय) 220/132 ह(cid:10)रयाणा 100 मई-07 3 गढ़चंदौर 220/33 महाराJ(cid:26) 25 मई-07 7 कामावरेपुकोटा 220/132 आं” .दशे 100 जुलाई -07 8 पा3न ापुरम् 230/110 तिमलनाडु 100 जुलाई -07 9 अिगया 220/132 असम 50 जुलाई -07 10 सुRामणयमपुरम् िuतीय आईसीटी 220/66 कना(टक 50 अग,त -07 (िव,त ार) 11 दवे नह(cid:18)ल ी अंतरा(J(cid:26) ीय एअर पोट( 220/66 कना(टक 100 अग,त -07 12 संकानरे ी 230/110 तिमलनाडु 100 अग,त -07 13 पो3न ापरु म् िuतीय आईसीटी 230/110 तिमलनाडु 100 अग,त -07 Chhatigarh 14 महासमुंद 220/132 160 अग,त -07 15 इंदौर (पूव)( 220/33 मcय .दशे 100 अग,त -07 16 कंबा (िभवंडी-II) 220/22 महाराJ(cid:26) 50 अग,त -07 17 तंबाती (िव,त ार) 220/22 महाराJ(cid:26) 25 अग,त -07 18 क^डम(cid:18)ल ेप(cid:18)ल ी 220/132 आं” .दशे 100 अग,त -07 19 अ(cid:18)व र सुदढ़ृ ीकरण (100-50) 220/132 राज,थ ान 50 िसतंबर-07 20 धनडरीकाला सुदढ़ृ ीकरण 220/66 पंजाब 100 िसतंबर-07 21 बडौत (160-100) 220/132 उ&त र .दशे 60 िसतंबर-07 22 कुरकुंभ 220/33 महाराष (cid:26)् 50 िसतंबर-07534 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट ट ट ेेशशेेशशनननन ववववोोोो4444टट टट ेेजजेेजज (cid:7)(cid:7)(cid:7)(cid:7)ममममतततताााा पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा ममममााााहहहह >>>>....सससस..ंं..ंं अअअअननननपपुुपपुु ाााातततत VVVV>>>>ययययाााा5555वव वव ययययनननन ((((एएएएमममम ((((ककककेेेेववववीीीी////ककककेेेेववववीीीी)))) एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी डडडड(cid:2)(cid:2)(cid:2)(cid:2)44 44 यय यय ूू ूू //// एएएएममममववववीीीीएएएए)))) 23 बहादरु गढ़ िuतीय आईसीटी 220/132 ह(cid:10)रयाणा 100 िसतंबर-07 24 घटनां4 े तृतीय आईसीटी 220/33 महाराJ(cid:26) 100 िसतंबर-07 25 वीटा सुदढ़ृ ीकरण (50-25) 220/33 महाराJ(cid:26) 25 िसतंबर-07 26 िसरसी 220/66 कना(टक 50 िसतंबर-07 27 संकानरे ी अित(cid:10)र(cid:25)त 230/110 तिमलनाडु 100 िसतंबर-07 28 इंगुर अित(cid:10)र(cid:25)त 230/110 तिमलनाडु 100 िसतंबर-07 29 कोिडकु(cid:10)र>छ ी अित(cid:10)र(cid:25)त 230/110 तिमलनाडु 100 िसतंबर-07 30 तेDब ुरनी 220/33 महाराJ(cid:26) 25 अ(cid:25)ट ूबर-07 31 सी.आर. पटना (य>छ 3न ाह(cid:18)ल ी) 220/66 कना(टक 200 अ(cid:25)ट ूबर-07 32 क(cid:18)य ानदगु ( 220/132 आं” .दशे 100 अ(cid:25)ट ूबर-07 33 रीवा (अित(cid:10)र(cid:25)त ) 220/132 मcय .दशे 160 अ(cid:25)ट ूबर-07 34 आगरा कgट (िव,त ार) 220/33 उ&त र .दशे 23 अ(cid:25)ट ूबर-07 35 वलूथूर 230/110 तिमलनाडु 300 अ(cid:25)ट ूबर-07 36 शाहजहांपुर सुदढ़ृ ीकरण (160-100) 220/132 उ&त र .दशे 60 नवDब र-07 37 एचएसआर लेआउट अग,त 220/66 कना(टक 100 नवDब र-07 2x(150-100) 38 एनआरएस सुदढ़ृ ीकरण (150-100) 220/66 कना(टक 50 नवDब र-07 39 थारामणी अित(cid:10)र(cid:25)त 230/110 तिमलनाडु 100 नवDब र-07 40 दौलताबाद आईसीटी-I 220/66 ह(cid:10)रयाणा 100 नवDब र-07 41 जैनकोटे (िव,त ार) 220/132 जDम ू और 150 7दसDब र-07 कiम ीर 42 बुरला 220/132 उड़ीसा 200 7दसDब र-07 43 तरकेरा (चतुथ() 220/132 उड़ीसा 100 7दसDब र-07 44 बालीमेला .थम 220/33 उड़ीसा 20 7दसDब र-07 45 कृJण ा नगर (2x160) 220/132 पिZम बंगाल 320 7दसDब र-07 46 आसनसोल 220/132 पिZम बंगाल 160 7दसDब र-07 47 7फरोजाबाद िव,त ार 220/132 उ&त र .दशे 100 7दसDब र-07 48 खुजा( िव,त ार 220/132 उ&त र .दशे 40 7दसDब र-07 49 हाथरस 220/132 उ&त र .दशे 40 7दसDब र-08 50 गाजीपुर 220/132 उ&त र .दशे 100 7दसDब र-07 51 मंडवार (दौआ) 220/132 राज,थ ान 100 7दसDब र-07 52 Gखवसर / 1X100 एमवीए 220/132 राज,थ ान 100 7दसDब र-07 53 अमलनेर 220/132 महाराJ(cid:26) 100 7दसDब र-07 54 तालंगड े (पांच िसतारा 220/33 महाराJ(cid:26) 50 7दसDब र-07 एमआईडीसी) कागल¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 535 ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट ट ट ेेशशेेशशनननन ववववोोोो4444टट टट ेेजजेेजज (cid:7)(cid:7)(cid:7)(cid:7)ममममतततताााा पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा ममममााााहहहह >>>>....सससस..ंं..ंं अअअअननननपपुुपपुु ाााातततत VVVV>>>>ययययाााा5555वव वव ययययनननन ((((एएएएमममम ((((ककककेेेेववववीीीी////ककककेेेेववववीीीी)))) एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी डडडड(cid:2)(cid:2)(cid:2)(cid:2)44 44 यय यय ूू ूू //// एएएएममममववववीीीीएएएए)))) 55 मौलाली 220/132 आं” .दशे 160 7दसDब र-07 56 शापुर नगर 220/132 आं” .दशे 160 7दसDब र-07 57 ह(cid:10)टया 220/132 झारखंड 300 जनवरी-08 58 चांिडल तृतीय (cid:26)ांसफॉम(र 220/132 झारखंड 100 जनवरी-08 59 उस@ (1x50) 220/33 महाराJ(cid:26) 50 जनवरी-08 60 अमलनेर (1x100) 220/132 महाराJ(cid:26) 100 जनवरी-08 61 िपरांगुट 220/22 महाराJ(cid:26) 50 जनवरी-08 62 अदलसार 220/22 गुजरात 50 जनवरी-08 63 एकलाहरे (200-50) 220/132 महाराJ(cid:26) 150 जनवरी-08 64 गोबी 230/110 तिमलनाडु 100 जनवरी-08 65 िसWसरे ी 230/110 तिमलनाडु 100 जनवरी-08 66 थकचंकुरीती 230/110 तिमलनाडु 100 जनवरी-08 67 7कलपौक (िव,त ार) 50 से 100 230/110 तिमलनाडु 50 जनवरी-08 68 िव3न ामंगलम् (िव,त ार) 50 से 100 230/110 तिमलनाडु 50 जनवरी-08 69 इंगूर (िव,त ार) 50 स े 100 230/110 तिमलनाडु 50 जनवरी-08 70 कनकपुरा 220/66 कना(टक 100 जनवरी-08 71 िबदादी अित(cid:10)र(cid:25)त (cid:26)ांसफॉमर( 220/66 कना(टक 100 जनवरी-08 72 मालापरंबा 220/110 केरल 100 जनवरी-08 73 बरसाना 220/66 गुजरात 100 जनवरी-08 74 दनू ी 220/132 राज,थ ान 50 फरवरी-08 75 उ!ोग िबहार (िव,त ार) 220/132 राज,थ ान 50 फरवरी-08 76 हिं डया (अित(cid:10)र(cid:25)त .) 220/33 मcय .दशे 160 फरवरी-08 77 िनमरानी (अित(cid:10)र(cid:25)त ) 220/132 मcय .दशे 160 फरवरी-08 78 जालना (50-25) 220/33 महाराJ(cid:26) 25 फरवरी-08 79 आईसीओएम (चं4पुर) 220/33 महाराJ(cid:26) 50 फरवरी-08 80 Gहजेवाड े (50-25) 220/22 महाराJ(cid:26) 25 फरवरी-08 81 गोकुल सुदढ़ृ ीकरण (160-100) 220/132 उ&त र .दशे 60 फरवरी-08 82 सी.बी. गंज (160-100) 220/132 उ&त र .दशे 60 फरवरी-08 83 टे(cid:25)क ाली 220/132 आं” .दशे 100 माच(-08 84 शादनगर 220/132 आं” .दशे 100 माच(-08 85 शाहपुर 220/110 कना(टक 100 माच(-08 86 7कलपौक (िव,त ार) 50 से 100 230/110 तिमलनाडु 50 माच(-08 87 करीमंगलम (अित(cid:10)र(cid:25)त ) 230/110 तिमलनाडु 100 माच(-08 88 पारवती (1x200+1x50) 220/22 महाराJ(cid:26) 250 माच(-08 89 वरोरा 220/33 महाराJ(cid:26) 25 माच(-08536 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट ट ट ेेशशेेशशनननन ववववोोोो4444टट टट ेेजजेेजज (cid:7)(cid:7)(cid:7)(cid:7)ममममतततताााा पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा ममममााााहहहह >>>>....सससस..ंं..ंं अअअअननननपपुुपपुु ाााातततत VVVV>>>>ययययाााा5555वव वव ययययनननन ((((एएएएमममम ((((ककककेेेेववववीीीी////ककककेेेेववववीीीी)))) एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी डडडड(cid:2)(cid:2)(cid:2)(cid:2)44 44 यय यय ूू ूू //// एएएएममममववववीीीीएएएए)))) 90 उमरेद 220/33 महाराJ(cid:26) 25 माच(-08 91 कलरछेम (थाणे) 220/22 महाराJ(cid:26) 50 माच(-08 92 रंजनगांव सुदढ़ृ ीकरण 220/22 महाराJ(cid:26) 150 माच(-08 (1x50+1x100) 93 सारनाथ सुदढ़ृ ीकरण (160-100) 220/132 उ&त र .दशे 60 माच(-08 94 सलेमपुर 220/66 ह(cid:10)रयाणा 100 माच(-08 95 अलेफता 220/132 महाराJ(cid:26) 100 माच(-08 96 िबJण ूपुर 220/132 पिZम बंगाल 320 माच(-08 97 राजपुर 220/11 गुजरात 25 माच(-08 98 †ीडूगं रगढ़ 220/132 राज,थ ान 100 माच(-08 99 िसवान (नया) गोपालगंज 220/132 िबहार 200 माच(-08 ककककुुुुलललल ((((रररराााा""""यय यय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे )))) 222222220000 9999444455558888 ककककुुुुलललल 444400000000 ककककेेेेववववीीीी ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट टट ेेेेशशशशनननन ((((अअअअििििखखखखलललल भभभभााााररररतततत )))) 11110000222266665555 ककककुुुुलललल 222222220000 ककककेेेेववववीीीी ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट टट ेेेेशशशशनननन ((((अअअअििििखखखखलललल भभभभााााररररतततत )))) 9999666655558888¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 537 अअअअननननबबुुबबुु धधंंधधंं –––– 6666....2222 2222000000008888----00009999 ककककेेेे ददददौौौौरररराााानननन पपपपााााररररेेेेषषषषणणणण (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााििििललललयययय,,,, ffffईईईई ववववििृृििृृ BBBB 2222000000008888----00009999 ककककेेेे ददददौौौौरररराााानननन (cid:12)(cid:12)(cid:12)(cid:12)थथ थथ ााााििििपपपपतततत कककक.... गगगगईईईई पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन (cid:27)(cid:27) (cid:27)(cid:27) सससस..ंं..ंं पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन,,,, ककककाााा ननननाााामममम ससससYYYYककककटटटट कककक.... VVVV>>>>ययययाााा5555वव वव ययययनननन ललललााााइइइइनननन कककक.... पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा ममममााााहहहह ससससaaंंaaंं यय यय ाााा एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ललललबबंंबबंं ााााईईईई ((((ससससीीीीककककेेेेएएएएमममम)))) IIII.... 777766665555 ककककेेेेववववीीीी ललललााााइइइइनननन (cid:27)(cid:27) (cid:27)(cid:27) 1 िसपत - िसवनी लाइन -II एस/सी पावरिSड 354 अ.ैल.'08 2 आगरा-Pव ािलयर िuतीय एस/सी एस/सी पावरिSड 128 माच(-09 (आरंभ म(cid:19) 400 केवी पर .चािलत करने के िलए) 3 िसवनी - वधा( लाइन (400 केवी पर एस/सी पावरिSड 269 माच(-09 .चािलत करने के िलए) ककककुुुुलललल 777766665555 ककककेेेेववववीीीी ललललााााइइइइनननन (cid:24)(cid:24) (cid:24)(cid:24)((((अअअअििििखखखखलललल 777755551111 भभभभााााररररतततत )))) सससस..ंं..ंं पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन,,,, ककककाााा ननननाााामममम ससससYYYYककककटटटट VVVV>>>>ययययाााा5555वव वव ययययनननन ललललााााइइइइनननन कककक.... पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा ममममााााहहहह ससससaaंंaaंं यय यय ाााा एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ललललबबंंबबंं ााााईईईई ((((ससससीीीीककककेेेेएएएएमममम)))) IIIIllll.... 444400000000 ककककेेेेववववीीीी ललललााााइइइइनननन ((((CCCC)))) 1 ितWनेवेली म(cid:19) मदरु ई (पीजी)-ि9व(cid:19)4म डी/सी पावरिSड 107 माच(-08 (पीजी) के िuतीय स6कट का एलआईएलओ 2 बरेली-मुरादाबाद एस/सी पावरिSड 91 मई-08 3 मेलाकोKायूर सब-,ट ेशन पर मौजूदा डी/सी पावरिSड 31 मई-08 कोलार –†ीपेरंबदरु का एलआईएलओ 4 ता,त ा-V - िसलीगुडी एस/सी पावरिSड 114 मई-08 (स6कट-II ) 5 िसपत - रायपुर डी/सी पावरिSड 298 जुलाई -08 6 कोटा-मेरटा डी/सी पावरिSड 512 जनवरी-09 7 रांची-िसपत लाइन डी/सी पावरिSड 816 जनवरी-09 8 आरएपीपी 5&6 – कोटा डी/सी पावरिSड 75 माच(-09 9 िभवाडी म(cid:19) िहसार-जयपुर का डी/सी पावरिSड 156 माच(-09 एलआईएलओ 10 WडकV म(cid:19) ऋिषकेश-मुजBफरनगर डी/सी पावरिSड 3 माच(-09 एलआईएलओ538 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] सससस..ंं..ंं पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन,,,, ककककाााा ननननाााामममम ससससYYYYककककटटटट VVVV>>>>ययययाााा5555वव वव ययययनननन ललललााााइइइइनननन कककक.... पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा ममममााााहहहह ससससaaंंaaंं यय यय ाााा एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ललललबबंंबबंं ााााईईईई ((((ससससीीीीककककेेेेएएएएमममम)))) 11 वधा(-अकोला डी/सी पावरिSड 324 माच(-09 12 पुगालूर-मदरु ई डी/सी पावरिSड 246 माच(-09 13 जेरदा-कंकरोली डी/सी पावरिSड 470 माच(-09 14 नेवेली-टीएस -II – पुगालूर डी/सी पावरिSड 395 माच(-09 15 कुंडनकुलम (एनपीसी) – ितWनेवेली डी/सी पावरिSड 145 माच(-09 (पीजी) ((cid:25)व ैद) लाइन I 16 कुंडनकुलम (एनपीसी) – ितWनेवेली डी/सी पावरिSड 160 माच(-09 (पीजी) ((cid:25)व ैद) लाइन II 17 ितWनेवेली (पीजी) – उदमू लपेट डी/सी पावरिSड 534 माच(-09 (पीजी) ककककुुुुलललल 444400000000 ककककेेेेववववीीीी ललललााााइइइइनननन (cid:27)(cid:27) (cid:27)(cid:27)((((ससससीीीीएएएएसससस)))) 4444444477777777 222222220000 ककककेेेेववववीीीी ललललााााइइइइनननन (cid:27)(cid:27) (cid:27)(cid:27) कककक(cid:27)(cid:27)(cid:27)(cid:27)CCCCीीीीयययय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे 1 वापी (पीजी) - मगरवडा लाइन डी/सी & पावरिSड 31 अ.ैल-08 एम/सी 2 वापी (पीजी) - खरड़पडा़ डी/सी पावरिSड 34 जून-08 (डीएनएच) 3 सीतानगर म(cid:19) टनकपुर-बरेली स6कट- डी/सी पावरिSड 44 माच(-09 1 का एलआईएलओ ककककुुुुलललल 222222220000 ककककेेेेववववीीीी ललललााााइइइइनननन (cid:27)(cid:27) (cid:27)(cid:27)कककक.... ((((ससससीीीीएएएएसससस)))) 111100009999 ककककुुुुलललल ससससीीीीएएएएसससस ((((777766665555 ++++444400000000++++222222220000)))) 5555333333337777 सससस..ंं..ंं पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन,,,, ककककाााा ननननाााामममम ससससYYYYककककटटटट VVVV>>>>ययययाााा5555वव वव ययययनननन ललललााााइइइइनननन कककक.... पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा ममममााााहहहह ससससaaंंaaंं यय यय ाााा एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ललललबबंंबबंं ााााईईईई ((((ससससीीीीककककेेेेएएएएमममम)))) 444400000000 केवी ((((रा2य 8े9)))) 1 अमरकंटक म(cid:19) कोरबा – िसपत डी/सी छ&त ीसगढ़ 62 अ.लै -08 एलआईएलओ 2 जेटीपीएस – रायपुर डी/सी डी/सी छ&त ीसगढ़ 516 मई-08 3 रामागुंडम (एनटीपीसी)-7दचप(cid:18)ल ी एस/सी आं” .दशे 171 मई-08 4 गजवेल म(cid:19) रामागुंडम-घानापुर डी/सी आं” .दशे 21 अग,त -08 एलआईएलओ 5 रतनगढ़-मेरटा एस/सी राज,थ ान 181 मई-08 6 बीटीपी म(cid:19) आरटीपी-गुXटूर डी/सी कना(टक 2 जून-08¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 539 सससस..ंं..ंं पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन,,,, ककककाााा ननननाााामममम ससससYYYYककककटटटट VVVV>>>>ययययाााा5555वव वव ययययनननन ललललााााइइइइनननन कककक.... पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा ममममााााहहहह ससससaaंंaaंं यय यय ाााा एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ललललबबंंबबंं ााााईईईई ((((ससससीीीीककककेेेेएएएएमममम)))) एलआईएलओ 7 दमोह म(cid:19) िबरGसहपुर – दमोह डी/सी डी/सी मcय .दशे 26 अग,त -08 एलआईएलओ 8 िबरGसहपुर म(cid:19) िबरGसहपरु -कटनी- डी/सी मcय .दशे 1 अग,त -08 दमोह इंटरकने(cid:25)श न 9 कटनी म(cid:19) िबरGसहपुर-कटनी – दमोह डी/सी मcय .दशे 2 अग,त -08 डायवज(न 10 सगर7दघी म(cid:19) फर(cid:25)क ा-उभाSाम डी/सी पिZम 13 अग,त -08 एलआईएलओ बंगाल 11 7कशेनपुर-बगलीहार (.थम स6कट) एस/सी जDम ू और 68 अ(cid:25)ट ूबर-08 कiम ीर 12 एनपीसीएल-रायपुर डी/सी छ&त ीसगढ़ 28 माच(-09 13 छाबडा़-डहे रा (कोटा) डी/सी राज,थ ान 261 माच(-09 ककककुुुुलललल 444400000000 ककककेेेेववववीीीी ललललााााइइइइनननन (cid:27)(cid:27) (cid:27)(cid:27)((((ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट ट ट ेेशशेेशशनननन)))) 1111333355552222 222222220000 ककककेेेेववववीीीी ललललााााइइइइनननन ((((ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट टट ेेेेशशशशनननन)))) 1 रंगनाथपुरम् म(cid:19) पुगालूर-चेक3न ूरम ् डी/सी तिमलनाडु 32 अ.ैल-08 का एलआईएलओ 2 इटारसी म(cid:19) भोपाल-इटारसी के दोन^ 2xडी/ मcय .दशे 2 अ.ैल-08 स6कट^ का एलआईएलओ सी 3 अकहाखोल-7कम डी/सी गुजरात 8 अ.ैल-08 4 एनपीसीएल-गुWर (सीईबी) एस/सी छ&त ीसगढ़ 20 अ.ैल-08 5 ˜यूगनह(cid:18)ल ी (के आर पेट) म(cid:19) िशमोगा डी/सी कना(टक 23 मई-08 –मैसूर एलआईएलओ 6 कंकरोली (पीजी) म(cid:19) भीलवाडा़- एस/सी राज,थ ान 9.5 मई-08 कंकरोली एलआईएलओ 7 पो3न ापुरम्- प(cid:18)ल ादाम डीसी तिमलनाडु 32 जून-08 पर सी 8 मंडीदीप म(cid:19) इटारसी-भोपाल .थम डी/सी मcय .दशे 12 जून-08 स6कट का एलआईएलओ 9 पीमतपुर-रागढ़ (िuतीय) स6कट एस/सी मcय .दशे 69 जून-08 10 िनलोखेरी-करनाल एस/सी ह(cid:10)रयाणा 19 जून-08 11 अमलोह रोड गोGबदगढ़ म(cid:19) डी/सी पंजाब 2 जून-08 गोGबदगढ़-I - गोGबदगढ़-II के एलआईएलओ 12 लुिधयाना (पीजी) लालटोन-जारेन डी/सी पंजाब 4 जून-08 .थम स6कट का एलआईएलओ540 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] सससस..ंं..ंं पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन,,,, ककककाााा ननननाााामममम ससससYYYYककककटटटट VVVV>>>>ययययाााा5555वव वव ययययनननन ललललााााइइइइनननन कककक.... पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा ममममााााहहहह ससससaaंंaaंं यय यय ाााा एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ललललबबंंबबंं ााााईईईई ((((ससससीीीीककककेेेेएएएएमममम)))) 13 बन(-7कहने पुर डी/सी जDम ू और 75 जून-08 कiम ीर 14 किलवंथापXटू 400 केवी सब-,ट ेशन डी/सी तिमलनाडु 14 जुलाई -08 म(cid:19) एस पी कोइल-थारामिण ।। एलआईएलओ 15 कयाथर- छे(cid:25)क ानूरानी 400 केवी डी/सी तिमलनाडु 244 जुलाई -08 सब-,ट ेशन 16 kकारेiव र म(cid:19) बरवाहा-नेपानगर 2xडी/ मcय .दशे 91 जुलाई -08 (खंडवा) एलआईएलओ सी 17 कवाई म(cid:19) छाबरा-बारन-दहरा डी/सी राज,थ ान 2 जुलाई -08 एलआईएलओ 18 हीरापुरा-ब,स ी लाइन के .थम एस/सी राज,थ ान 59 जुलाई -08 स6कट को खोलना और संगानेर- फुलेरा को जोड़ना 19 खासा-अ—तसर (बालाचक म(cid:19) डी/सी पंजाब 44 जुलाई -08 (पीजीसीआईएल)) 20 मोगा (400 केवी) – जगरांव डी/सी पंजाब 1 जुलाई -08 21 ओरेगाडोम सब-,ट ेशन पर डी/सी तिमलनाडु 18 अग,त -08 †ीपेरDब दरू -एसपी कोइल का एलआईएलओ 22 वीरापुरम् म(cid:19) एसपी कोइल-थारामिण डी/सी तिमलनाडु 5 अग,त -08 का एलआईएलओ 23 रायगढ़ (पीजी) म(cid:19) पीतमपुर-रायगढ़ 2xडी/ मcय .दशे 92 अग,त -08 डी/सी के दने ^ स6कट^ का सी एलआईएलओ 24 कडािवनाकोड े म(cid:19) एमजी-मैसूर डी/सी कना(टक 33 अग,त -08 एलआईएलओ 25 राज पिZम एलटीपीएस म(cid:19) िगराल- डी/सी राज,थ ान 5 अग,त -08 बाम(र स6कट 1 का एलआईएलओ 26 भथा(ना म (cid:19) पारी8ा-सेफई का डी/सी उ&त र .दशे 5 अग,त -08 एलआईएलओ 27 अमरकंटक (चचाई) म(cid:19) िबरGसहपुर- डी/सी मcय .दशे 90 िसतंबर-08 सतना का एलआईएलओ 28 वीकेआईए म(cid:19) हीरापुर-कुकास डी/सी राज,थ ान 2 िसतंबर-08 एलआईएलओ 29 .,त ािवत पुगालूर 400 केवी सब- डी/सी तिमलनाडु 15 अ(cid:25)ट ूबर-08 ,ट ेशन म(cid:19) पुगालूर-िमवाडी का एलआईएलओ¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 541 सससस..ंं..ंं पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन,,,, ककककाााा ननननाााामममम ससससYYYYककककटटटट VVVV>>>>ययययाााा5555वव वव ययययनननन ललललााााइइइइनननन कककक.... पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा ममममााााहहहह ससससaaंंaaंं यय यय ाााा एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ललललबबंंबबंं ााााईईईई ((((ससससीीीीककककेेेेएएएएमममम)))) 30 अलामथी सब-,ट ेशन-मनाली डी/सी तिमलनाडु 47 अ(cid:25)ट ूबर-08 31 बारदोली-िछकाली डी/सी गुजरात 96 अ(cid:25)ट ूबर-08 32 ‘डी-एचएएल डी/सी कना(टक 6 अ(cid:25)ट ूबर-08 33 िभवाडी (पीजीसीआईएल)-नीमराना एस/सी राज,थ ान 52 अ(cid:25)ट ूबर-08 34 खुखेरा म(cid:19) िभवाडी-नीमराना डी/सी राज,थ ान 8 अ(cid:25)ट ूबर-08 एलआईएलओ 35 खुखेरा म(cid:19) अ(cid:18)व र-िभवाडी डी/सी राज,थ ान 5 अ(cid:25)ट ूबर-08 एलआईएलओ 36 7कशनगढ़ म(cid:19) अजमेर-फुलेरा डी/सी राज,थ ान 0.2 अ(cid:25)ट ूबर-08 एलआईएलओ 37 सीधी के िलए िबरGसहपुर-रीवा डी/सी मcय .दशे 118 नवDब र-08 एलआईएलओ 38 कुकमा म(cid:19) अंजार-पाना-ोके .थम डी/सी गुजरात 5 नवDब र-08 स6कट का एलआईएलओ 39 दरु ाला म(cid:19) शहबाद-पेहोबा .थम डी/सी ह(cid:10)रयाणा 6 नवDब र-08 स6कट का एलआईएलओ 40 फतेहाबाद (पीजी) म(cid:19) नरवाना- डी/सी ह(cid:10)रयाणा 5 नवDब र-08 फतेहाबाद और फतेहाबाद-िसरसा एलआईएलओ 41 भूना म(cid:19) नरवाना-फतेहाबाद डी/सी ह(cid:10)रयाणा 16 नवDब र-08 एलआईएलओ 42 पदमानवपुर-बालासेर डी/सी उड़ीसा 44 नवDब र-08 43 भीमावरम्-गुडीवाडा डी/सी आं” .दशे 121 नवDब र-08 44 दमोह (400 केवी) म(cid:19) दमोह- डी/सी मcय .दशे 2 7दसDब र-08 टीकमगढ़ .थम स6कट एलआईएलओ 45 सागर म(cid:19) दमोह-बीना डी/सी िuतीय डी/सी मcय .दशे 10 7दसDब र-08 स6कट का एलआईएलओ 46 बडौद म(cid:19) उ2ज ैन-कोटा दोन^ स6कट^ डी/सी मcय .दशे 15 7दसDब र-08 का एलआईएलओ 47 मु4ा (अदानीi) –नानी खाखरे डी/सी गुजरात 33 7दसDब र-08 48 बHरघर-Gखनवसर एस/सी राज,थ ान 98 7दसDब र-08 49 जीएनडीटीपी-मुकतर (िuतीय डी/सी पंजाब 53 7दसDब र-08 पर स6कट) एस/सी 50 एचआईएएल म(cid:19) मिमदीप(cid:18)ल ी- डी/सी आं” .दशे 3 7दसDब र-08 चं4यंगुKा स6कट-2 का एलआईएलओ 51 मेदछल म(cid:19) मलकारम्-िमनपुर िuतीय डी/सी आं” .दशे 1 7दसDब र-08 स6कट एलआईएलओ542 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] सससस..ंं..ंं पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन,,,, ककककाााा ननननाााामममम ससससYYYYककककटटटट VVVV>>>>ययययाााा5555वव वव ययययनननन ललललााााइइइइनननन कककक.... पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा ममममााााहहहह ससससaaंंaaंं यय यय ाााा एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ललललबबंंबबंं ााााईईईई ((((ससससीीीीककककेेेेएएएएमममम)))) 52 रेनताGछताला म (cid:19) वीटी-त(cid:18)ल ाप(cid:18)ल ी डी/सी आं” .दशे 2 7दसDब र-08 एलआईएलओ 53 गंगापुर-वा(cid:18)व े डी/सी महाराJ(cid:26) 13 7दसDब र-08 54 कु™ालोर म(cid:19) नेवेली टीएस-।।-नेवेली डी/सी तिमलनाडु 22.5 जनवरी-09 जीरो यूिनट का एलआईएलओ 55 †ीपेरDब दरु 400 केवी सब-,ट ेशन- डी/सी तिमलनाडु 11 जनवरी-09 नो7कया 56 खेमार-पु&त ूर (गुWवनयानकेरे-पु&त ूर डी/सी कना(टक 56 जनवरी-09 पाट( लाइन) 57 अथानी म(cid:19) महाGलगपुर-कुडाची डी/सी कना(टक 48 जनवरी-09 एलआईएलओ 58 बीजापुर म(cid:19) बसावनाबगेवडी-इंदी डी/सी कना(टक 12 जनवरी-09 एलआईएलओ 59 िवरशाभवाथी सब-,ट ेशन म(cid:19) पी3य ा- डी/सी कना(टक 0.5 जनवरी-09 सेमनाह(cid:18)ल ी एलआईएलओ 60 लोनी-मुरादनगर (400 केवी सब- डी/सी उ&त र .दशे 27 जनवरी-09 ,ट ेशन) 61 िसकंदराबाद म (cid:19) खुजा-( मुरादनगर डी/सी उ&त र .दशे 38 जनवरी-09 एलआईएलओ 62 गोमतीनगर म(cid:19) सरोजनीनगर-िचनहट डी/सी उ&त र .दशे 7 जनवरी-09 एलआईएलओ 63 दोहाने म(cid:19) सी.बी.गजं -बरेली डी/सी उ&त र .दशे 4 जनवरी-09 एलआईएलओ 64 आईबी थम(ल-बुघीपडार िuतीय डी/सी उड़ीसा 52 जनवरी-09 डी/सी 65 तालेगांव 400 केवी सब-,ट ेशन - डी/सी महाराJ(cid:26) 10 जनवरी-09 उरसे 220 केवी सब-,ट ेशन (.थम स6कट) 66 ह(cid:10)टया-लोहरदPग ा डी/सी झारखंड 122 जनवरी-09 67 केएलसी म(cid:19) जीरत-लqम ीकांतपुर डी/सी पिZम 6 जनवरी-09 एलआईएलओ बंगाल 68 पटना (पीजी) म(cid:19) फतना-खगौल .थम डी/सी िबहार 16 जनवरी-09 स6कट एलआईएलओ 69 जेपीएल-रायगढ़ (सीईबी) डी/सी छ&त ीसगढ़ 108 फरवरी-09 70 बीजापुर म(cid:19) बी बगेवाडी इंदी लाइन डी/सी कना(टक 11 फरवरी-09 का एलआईएलओ 71 धोरीम3न ा-िभनमल एस/सी राज,थ ान 92 फरवरी-09¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 543 सससस..ंं..ंं पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन,,,, ककककाााा ननननाााामममम ससससYYYYककककटटटट VVVV>>>>ययययाााा5555वव वव ययययनननन ललललााााइइइइनननन कककक.... पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा ममममााााहहहह ससससaaंंaaंं यय यय ाााा एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ललललबबंंबबंं ााााईईईई ((((ससससीीीीककककेेेेएएएएमममम)))) 72 वाईटीपीपी-अ(cid:4)द (cid:18)ु ल ापुर डी/सी ह(cid:10)रयाणा 56 फरवरी-09 73 िहसार (मै•यार) - इशारवल डी/सी ह(cid:10)रयाणा 92 फरवरी-09 74 मोहाली-II म (cid:19) मोहाली-। - दरे ा ब,स ी डी/सी पंजाब 1 फरवरी-09 एलआईएलओ 75 मोहाली-दरे ा ब,स ी (िuतीय स6कट डी/सी पंजाब 29 फरवरी-09 पर G,(cid:26)Gजग) एस/सी 76 जीपीएल म(cid:19) गजूवाका-वीएसएस का डी/सी आं” .दशे 6 फरवरी-09 एलआईएलओ 77 बोको सब-,ट ेशन म(cid:19) अिगया- डी/सी असम 1 फरवरी-09 साWसािजय के .थम स6कट का एलआईएलओ 78 िशवपुरी - सबलगढ़ डी/सी मcय .दशे 200 माच(-09 79 एनपीसीएल-बीएसपी-एमएसडीएस- डी/सी छ&त ीसगढ़ 8 माच(-09 6 80 7करन-भूना डी/सी ह(cid:10)रयाणा 60 माच(-09 81 मोगा (400 केवी) – बाघा पुराना डी/सी पंजाब 20 माच(-09 82 डुबुरी-पारादीप डी/सी उड़ीसा 226 माच(-09 83 गजवेल 400 केवी सब-,ट ेशन - एस/सी आं” .दशे 66 माच(-09 डी/सी पर कामारे™ी एस/सी 84 थेयूर-मागरपKा (मागरपKा म(cid:19) थेयूर- डी/सी महाराJ(cid:26) 25 माच(-09 फुWं गी एलआईएलओ) 85 मनेरी ।। म(cid:19) मनेरी-। -ऋिषकेश डी/सी उ&त राखंड 4 माच(-09 एलआईएलओ ककककुुुुलललल 222222220000 ककककेेेेववववीीीी ललललााााइइइइनननन (cid:27)(cid:27) (cid:27)(cid:27)((((ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट टट ेेेेशशशशनननन)))) 3333222222224444 ककककुुुुलललल ललललााााइइइइनननन (cid:27)(cid:27) (cid:27)(cid:27)((((444400000000++++222222220000)))) ककककेेेेववववीीीी 4444555577776666 ववववषषषष !! !! ककककेेेे ददददौौौौरररराााानननन पपपपणणूूणणूू !! !! कककक.... गगगगईईईई ककककुुुुलललल ससससीीीीककककेेेेएएएएमममम 444400000000 ककककेेेेववववीीीी ललललााााइइइइनननन (cid:27)(cid:27)(cid:27)(cid:27) 5555888822229999 ((((अअअअििििखखखखलललल भभभभााााररररतततत )))) ववववषषषष !! !! ककककेेेे ददददौौौौरररराााानननन पपपपणणूूणणूू !! !! कककक.... गगगगईईईई ककककुुुुलललल ससससीीीीककककेेेेएएएएमममम 222222220000 ककककेेेेववववीीीी ललललााााइइइइनननन (cid:27)(cid:27)(cid:27)(cid:27) 3333333333333333 ((((अअअअििििखखखखलललल भभभभााााररररतततत ))))544 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 2222000000008888----00009999 ककककेेेे ददददौौौौरररराााानननन (cid:12)(cid:12)(cid:12)(cid:12)थथ थथ ााााििििपपपपतततत ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट टट ेेेेशशशशनननन >>>>.... सससस..ंं..ंं ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट ट ट ेेशशेेशशनननन ववववोोोो4444टट टट ेेजजेेजज VVVV>>>>ययययाााा5555वव वव ययययनननन (cid:7)(cid:7)(cid:7)(cid:7)ममममतततताााा पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा ममममााााहहहह अअअअननननपपुुपपुु ाााातततत एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ((((एएएएमममम डडडड(cid:2)(cid:2)(cid:2)(cid:2)44 44 यय यय ूू ूू //// ((((ककककेेेेववववीीीी////ककककेेेेववववीीीी)))) एएएएममममववववीीीीएएएए)))) 444400000000 ककककेेेेववववीीीी ((((ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट ट ट ेेशशेेशशनननन)))) ((((ससससीीीीएएएएसससस)))) 1 इटारसी 400/220 पावरिSड 315 अ.ैल-08 2 ितWनेवेली आईसीटी- II 400/220 पावरिSड 315 अ.ैल-08 3 बरीपाडा 400/220 पावरिSड 315 अ.ैल-08 4 लुिधयाना आईसीटी-I 400/220 पावरिSड 315 मई-08 5 मेलाकोKैयूर आईसीटी-I 400/220 पावरिSड 315 मई-08 6 लुिधयाना आईसीटी-II 400/220 पावरिSड 315 जुलाई -08 7 कंकरोली सब-,ट ेशन 400/220 पावरिSड 945 िसतंबर-08 आईसीटी I & II 8 दमोह आईसीटी- I 400/220 पावरिSड 315 िसतंबर-08 9 मेलाकोKैयूर आईसीटी-II 400/220 पावरिSड 315 िसतंबर-08 10 दमोह आईसीटी - II 400/220 पावरिSड 315 नवDब र-08 11 ितWनेवेली आईसीटी-I 400/220 पावरिSड 315 नवDब र-08 12 भाटापारा आईसीटी-II 400/220 पावरिSड 315 जनवरी-09 13 कोटा सब-,ट ेशन 400/220 पावरिSड 630 माच(-09 14 WडकV सब-,ट ेशन 400/220 पावरिSड 315 माच(-09 15 राजगढ़ सब-,ट ेशन 400/220 पावरिSड 315 माच(-09 (िuतीय आईसीटी) 16 वधा( 400/220 पावरिSड 315 माच(-09 17 उडूमालपेट (पीजी) 400/220 पावरिSड 315 माच(-09 (िव,त ार) ककककुुुुलललल ((((कककक(cid:27)(cid:27)(cid:27)(cid:27)CCCCीीीीयययय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे )))) 6666333300000000 444400000000 ककककेेेेववववीीीी ((((ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट ट ट ेेशशेेशशनननन)))) ((((एएएएससससएएएएसससस)))) 1 एनपीसीएल (2x315 400/220 छ&त ीसगढ़ 315 अ.ैल-08 एमवीए) 2 गजवेल आईसीटी –I 400/220 एपी (cid:26)ां,क ो 315 िसतंबर-08¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 545 3 गजवेल आईसीटी –II 400/220 एपी (cid:26)ां,क ो 315 माच(-09 4 सारनाथ िव,त ार 400/220 उ&त र .दशे 120 अ(cid:25)ट ूबर-08 2x(160-100) ककककुुुुलललल ((((रररराााा""""यय यय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे )))) 1111000066665555 ककककुुुुलललल ((((अअअअििििखखखखलललल भभभभााााररररतततत)))) 444400000000////222222220000 7777333366665555 >>>>....सससस..ंं..ंं ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट ट ट ेेशशेेशशनननन ववववोोोो4444टट टट ेेजजेेजज VVVV>>>>ययययाााा5555वव वव ययययनननन (cid:7)(cid:7)(cid:7)(cid:7)ममममतततताााा पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा ममममााााहहहह अअअअननननपपुुपपुु ाााातततत एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ((((एएएएममममडडडड(cid:2)(cid:2)(cid:2)(cid:2)44 44 यय यय //ूू//ूू ((((ककककेेेेववववीीीी////ककककेेेेववववीीीी)))) एएएएममममववववीीीीएएएए)))) IIIIIIII.... 222222220000 ककककेेेेववववीीीी ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट ट ट ेेशशेेशशनननन ((((ससससीीीीएएएएसससस)))) 1 िसतारगंज 220/132 पावरिSड 100 फरवरी-09 2 बरजोरा 220/33 डीवीसी 100 फरवरी-09 3 दगु ा(पुर 220/33 डीवीसी 80 फरवरी-09 ककककुुुुलललल ((((कककक(cid:27)(cid:27)(cid:27)(cid:27)CCCCीीीीयययय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे )))) 222288880000 222222220000 ककककेेेेववववीीीी ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट टट ेेेेशशशशनननन ((((एएएएससससएएएएसससस)))) 1 रंगनाथपुरम (2x50) 230/110 तिमलनाडु 50 अ.ैल-08 2 पेरDब दरू अित(cid:10)र(cid:25)त (cid:26)ांसिमशन 230/110 तिमलनाडु 100 मई-08 3 प(cid:18)ल ादम 230/110 तिमलनाडु 200 जून-08 4 वीरापुरम 230/110 तिमलनाडु 100 जून-08 5 पुदनचांडी (अित(cid:10)र(cid:25)त 230/110 तिमलनाडु 100 जून-08 (cid:26)ांसिमशन) 6 उ!यथूर (अित(cid:10)र(cid:25)त 230/33 तिमलनाडु 50 जून-08 (cid:26)ांसिमशन) 7 कोर&त रू (अित(cid:10)र(cid:25)त 230/110 तिमलनाडु 100 जुलाई -08 (cid:26)ांसिमशन) 8 ओरगादम 230/110 तिमलनाडु 100 अग,त -08 9 मनाली (अित(cid:10)र(cid:25)त 230/110 तिमलनाडु 100 अग,त -08 (cid:26)ांसिमशन) 10 िथWवलमा (अग,त ) (100- 230/110 तिमलनाडु 20 अ(cid:25)ट ूबर-08 80) 11 उ!याथूर (अित(cid:10)र(cid:25)त 230/33 तिमलनाडु 50 जनवरी-09 (cid:26)ांसिमशन) 12 कदापेरी (अग,त )(2x100- 230/110 तिमलनाडु 40 जनवरी-09 2x80)546 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 13 अमूथापुरम 230/33 तिमलनाडु 50 जनवरी-09 14 बालीपार (तेजपुर) 220/132 असम 50 अ.ैल-08 15 बोको 220/132 असम 50 फरवरी-09 16 वाडा 220/22 महाराJ(cid:26) 50 अ.ैल-08 17 पंधानपुर 220/22 महाराJ(cid:26) 50 जुलाई -08 18 कोलशेट 220/22 महाराJ(cid:26) 50 जुलाई -08 19 भूगांव 220/33 महाराJ(cid:26) 25 िसतंबर-08 20 िभवंडी II(कांबा) 220/22 महाराJ(cid:26) 50 िसतंबर-08 21 कुरकंभ (50-25) 220/33 महाराJ(cid:26) 25 िसतंबर-08 22 कोलशेट 220/100 महाराJ(cid:26) 200 िसतंबर-08 23 िभगवान (िव,त ार) 220/33 महाराJ(cid:26) 25 अ(cid:25)ट ूबर-08 24 पौड़ 220/132 महाराJ(cid:26) 100 नवDब र-08 25 मालेगांव II 220/32 महाराJ(cid:26) 50 नवDब र-08 26 नलावपारा 220/22 महाराJ(cid:26) 50 नवDब र-08 27 गंगापुर (3x100) 220/132 महाराJ(cid:26) 300 7दसDब र-08 28 फुWं गी (2x100) 220/132 महाराJ(cid:26) 200 7दसDब र-08 29 वथेर 220/132 महाराJ(cid:26) 100 माच(-09 30 नेWल 220/33 महाराJ(cid:26) 25 माच(-09 31 मगरपKा (3x50) 220/22 महाराJ(cid:26) 150 माच(-09 32 के. आर. पेट (˜यूगनह(cid:18)ल ी) 220/66 कना(टक 60 मई-08 33 येरंदानाह(cid:18)ल ी (तृतीय 220/66 कना(टक 100 जून-08 (cid:26)ांसिमशन) 34 शाहपुर (िuतीय (cid:26)ांसिमशन) 220/110 कना(टक 100 जून-08 35 अ(cid:18)ल ीपुरा (अित(cid:10)र(cid:25)त 220/110 कना(टक 100 जुलाई -08 (cid:26)ांसिमशन) 36 कडािवनाकोटे (2x100) 220/66 कना(टक 200 अग,त -08 37 एचएएल 220/66 कना(टक 100 अ(cid:25)ट ूबर-08 38 पु&त ूर 220/110 कना(टक 100 7दसDब र-08 39 एचएएल (िuतीय (cid:26)ांसिमशन) 220/66 कना(टक 100 जनवरी-09 40 अथानी 220/110 कना(टक 100 जनवरी-09 41 िŠशाभवाथी वेली (2x100) 220/66 कना(टक 100 फरवरी-09¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 547 42 शीरलको*प ा (2x100) 220/110 कना(टक 100 फरवरी-09 43 बीजापुर (2x100) 220/110 कना(टक 100 फरवरी-09 44 सलेमपुरr (िuतीय आईसीटी) 220/132 ह(cid:10)रयाणा 100 मई-08 45 नीलोखेरी सब-,ट ेशन (2x100 220/132 ह(cid:10)रयाणा 100 जुलाई -08 एमवीए) 46 ब(cid:18)ल भगढ़ सु4ढ़ीकरण 220/132 ह(cid:10)रयाणा 100 जुलाई -08 47 दौलताबाद िuतीय आईसीटी 220/66 ह(cid:10)रयाणा 100 जुलाई -08 48 दरु ाला 220/132 ह(cid:10)रयाणा 100 नवDब र-08 49 जो(cid:10)रयन (सु4ढ़ीकरण) 220/66 ह(cid:10)रयाणा 100 नवDब र-08 50 भूना (2x 100 एमवीए) 220/132 ह(cid:10)रयाणा 100 नवDब र-08 51 प(cid:18)ल ी (सु4ढ़ीकरण) 220/66 ह(cid:10)रयाणा 100 नवDब र-08 52 नीलोखेरी सब-,ट ेशन िuतीय 220/132 ह(cid:10)रयाणा 100 7दसDब र-08 (cid:26)ांसिमशन 53 यमुनानगर (जो(cid:10)रयन) तृतीय 220/66 ह(cid:10)रयाणा 100 फरवरी-09 आईसीटी 54 टेपला सु4ढ़ीकरण 220/66 ह(cid:10)रयाणा 100 माच(-09 55 धुरी (सु4ढ़ीकरण) (िuतीय 220/66 पंजाब 100 जून-08 (cid:26)ांसिमशन) 56 अमलोह रोड गोGबदगढ़ 220/66 पंजाब 100 जून-08 57 गोरै•या (सु4ढ़ीकरण) 220/132 पंजाब 100 िसतंबर-08 58 जीएनडीटीपी, बीटीआई 220/66 पंजाब 50 अ(cid:25)ट ूबर-08 सु4ढ़ीकरण (100-50) 59 रजला (सु4ढ़ीकरण) 220/66 पंजाब 100 7दसDब र-08 60 जीउचटीपी लेहरा मोहाबत 220/66 पंजाब 100 फरवरी-09 61 अतरौली िव,त ार 2 220/132 उ&त र .दशे 100 जून-08 62 आगरा कgट (63-40) 220/132 उ&त र .दशे 23 जुलाई -08 63 लोनी 220/132 उ&त र .दशे 100 अ(cid:25)ट ूबर-08 64 दोहना, बरेली 220/132 उ&त र .दशे 200 अ(cid:25)ट ूबर-08 65 भथ(ना 220/132 उ&त र .दशे 100 अ(cid:25)ट ूबर-08 66 आजमगढ़ सु4ढ़ीकरण 220/132 उ&त र .दशे 60 अ(cid:25)ट ूबर-08 2x(160-100) 67 मुरादनगर िव,त ार (160- 220/132 उ&त र .दशे 60 नवDब र-08 100) 68 सहारनपुर िव,त ार (160- 220/132 उ&त र .दशे 60 नवDब र-08548 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 100) 69 िसकंदराबाद (2x100) 220/132 उ&त र .दशे 200 जनवरी-09 70 नेहतौर सु4ढ़ीकरण (160- 220/132 उ&त र .दशे 60 जनवरी-09 100) 71 गोमतीनगर (3x60) 220/33 उ&त र .दशे 180 जनवरी-09 72 लोनी (िuतीय (cid:26)ांसिमशन) 220/132 उ&त र .दशे 100 जनवरी-09 73 हरदोई रोड िव,त ार (160- 220/132 उ&त र .दशे 60 जनवरी-09 100) 74 जौनपुर िव,त ार (160-100) 220/132 उ&त र .दशे 60 जनवरी-09 75 हाथरस िव,त ार (160-100) 220/132 उ&त र .दशे 60 जनवरी-09 76 िसमबोली िव,त ार (160- 220/132 उ&त र .दशे 60 जनवरी-09 100) 77 सी.बी. गंज िव,त ार (3x60) 220/132 उ&त र .दशे 60 जनवरी-09 78 फुलपूर िव,त ार (160-100) 220/132 उ&त र .दशे 60 माच(-09 79 कवाई 220/132 राज,थ ान 100 जुलाई -08 80 7कशनगढ़ (अजमेर) 220/132 राज,थ ान 100 िसतंबर-08 81 वीकेआईए 220/132 राज,थ ान 100 िसतंबर-08 82 नीमराना 220/132 राज,थ ान 100 अ(cid:25)ट ूबर-08 83 खुखेरा(अ(cid:18)व र) (1x100) 220/132 राज,थ ान 100 जनवरी-09 84 बीवर (सु4ढ़ीकरण) 220/132 राज,थ ान 50 माच(-09 85 फलोडी (सु4ढ़ीकरण) 220/132 राज,थ ान 50 माच(-09 86 कुछामन िसटी (सु4ढ़ीकरण) 220/132 राज,थ ान 100 माच(-09 87 अ(cid:18)व र (सु4ढ़ीकरण) 220/132 राज,थ ान 50 माच(-09 88 दहरा (सु4ढ़ीकरण) 220/132 राज,थ ान 100 माच(-09 89 कुकमा 220/66 गुजरात 100 अग,त -08 90 बाला (2x50) 220/11 गुजरात 100 फरवरी-09 91 दधु रेज (2x25) 220/11 गुजरात 50 फरवरी-09 92 सुहले ा (भाटापारा) 220/132 छ&त ीसगढ़ 160 अग,त -08 93 िस(cid:18)त ारा 220/132 छ&त ीसगढ़ 160 फरवरी-09 94 मेन ,ट ेप डाउन सब-,ट ेशन 220/132 छ&त ीसगढ़ 160 माच(-09 (एमडी)-6 95 मंडीदीप 220/132 मcय .दशे 160 िसतंबर-08 96 सागर 220/132 मcय .दशे 160 7दसDब र-08 97 बडौद 220/132 मcय .दशे 160 7दसDब र-08¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 549 98 होसंगाबाद 220/132 मcय .दशे 160 फरवरी-09 99 सबलगढ़ 220/132 मcय .दशे 160 माच(-09 100 मंडीदीप 220/132 मcय .दशे 100 माच(-09 101 दमोह (अित(cid:10)र(cid:25)त (cid:26)ांसिमशन) 220/132 मcय .दशे 160 माच(-09 102 राजगढ़ (धार) (अित(cid:10)र(cid:25)त 220/132 मcय .दशे 160 माच(-09 (cid:26)ांसिमशन) 103 बन( (2x160) 220/132 जDम ू और 160 अ(cid:25)ट ूबर-08 कiम ीर 104 मनीमाजरा (चंडीगढ़) 220/66 चंडीगढ़ 100 नवDब र-08 105 र(cid:19)ताGचताला 220/132 आं” .दशे 100 7दसDब र-08 106 गजवेल (आईसीटी-I) 220/132 आं” .दशे 100 फरवरी-09 107 केमारे™ी 220/132 आं” .दशे 100 माच(-09 108 गंगावरम् पोट( 220/33 आं” .दशे 31.5 माच(-09 109 फतुआ (सु4ढ़ीकरण) 220/132 िबहार 100 जनवरी-09 110 केएलसी 220/132 पिZम 100 जनवरी-09 बंगाल 111 गोकामा (तृतीय (cid:26)ांसिमशन) 220/132 पिZम 100 जनवरी-09 बंगाल 112 बवाना डीआईडीसी 220/66 7द(cid:18)ल ी 100 फरवरी-09 113 दि8ण वजीराबाद (चतुथ ( 220/66 7द(cid:18)ल ी 100 फरवरी-09 आईसीटी) 114 जीटी सब-,ट ेशन (अग,त ) 220/33 7द(cid:18)ल ी 60 फरवरी-09 (160-100) 115 बारकोटे (आईसीटी- II) 220/33 उड़ीसा 20 फरवरी-09 116 पारादीप (.थम) 220/132 उड़ीसा 100 माच(-09 ककककुुुुलललल ((((रररराााा""""यय यय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे )))) 222222220000 11111111000033334444....5555 ककककुुुुलललल ((((अअअअििििखखखखलललल भभभभााााररररतततत)))) 222222220000 11111111333311114444....5555550 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] अअअअननननबबुुबबुु धधंंधधंं ----6666....3333 2222000000009999----11110000 ककककेेेे ददददौौौौरररराााानननन बबबबढ़ढ़ढ़ढ़ााााईईईई कककक.... गगगगईईईई पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन (cid:27)(cid:27) (cid:27)(cid:27) 2222000000009999----11110000 ककककेेेे ददददौौौौरररराााानननन (cid:12)(cid:12)(cid:12)(cid:12)थथ थथ ााााििििपपपपतततत कककक.... गगगगईईईई पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन (cid:27)(cid:27) (cid:27)(cid:27) >>>>....सससस..ंं..ंं पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन ककककाााा ननननाााामममम ससससYYYYककककटटटट कककक.... VVVV>>>>ययययाााा5555वव वव ययययनननन ललललााााइइइइनननन कककक.... पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा ससससaaंंaaंं यय यय ाााा एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ललललबबंंबबंं ााााईईईई ममममााााहहहह ((((ससससीीीीककककेेेेएएएएमममम)))) IIII.... 777766665555 ककककेेेेववववीीीी ललललााााइइइइनननन (cid:27)(cid:27) (cid:27)(cid:27) 1 बीना (पीजी) – Pव ािलयर (पीजी) एस/सी पावरिSड 233 फरवरी-10 िuतीय एस/सी (आरंभ म(cid:19) 400 केवी पर .चािलत 7कए जाने के िलए) 2 िसवनी – बीना (आरंभ म(cid:19) 400 केवी एस/सी पावरिSड 293 माच(-10 पर .चािलत 7कए जाने के िलए) 3 (cid:10)टहरी पूGलग *व इंट पर 765 केवी डी/सी पावरिSड 8 माच(-10 डी/सी (cid:10)टहरी-मेरठ लाइन का एलआईएलओ ववववषषषष (cid:3)(cid:3) (cid:3)(cid:3)ककककेेेे ददददौौौौरररराााानननन पपपपररूूररूू ीीीी कककक(cid:18)(cid:18)(cid:18)(cid:18) गगगगईईईई ककककुुुुलललल 777766665555ककककेेेेववववीीीी ससससीीीीककककेेेेएएएएमममम ((((अअअअििििखखखखलललल भभभभााााररररततततीीीीयययय 555533334444 (cid:23)(cid:23)(cid:23)(cid:23)तत तत रररर पपपपरररर)))) >>>>....सससस..ंं..ंं पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन ककककाााा ननननाााामममम ससससYYYYककककटटटट कककक.... VVVV>>>>ययययाााा5555वव वव ययययनननन ललललााााइइइइनननन कककक.... पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा ससससaaंंaaंं यय यय ाााा एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ललललबबंंबबंं ााााईईईई ममममााााहहहह ((((ससससीीीीककककेेेेएएएएमममम)))) IIIIIIII.... ±±±± 555500000000 ककककेेेेववववीीीी एएएएचचचचववववीीीीडडडडीीीीससससीीीी ललललााााइइइइनननन (cid:27)(cid:27) (cid:27)(cid:27) 1 +/- 500 केवी बिलया-िभवाडी बाईपोल पावरिSड 1580 माच(-10 (2500 मेगावाट) ववववषषषष (cid:3)(cid:3) (cid:3)(cid:3)ककककेेेे ददददौौौौरररराााानननन पपपपररूूररूू ीीीी कककक(cid:18)(cid:18)(cid:18)(cid:18) गगगगईईईई ककककुुुुलललल 777766665555ककककेेेेववववीीीी ससससीीीीककककेेेेएएएएमममम ((((अअअअििििखखखखलललल 1111555588880000 भभभभााााररररततततीीीीयययय (cid:23)(cid:23)(cid:23)(cid:23)तत तत रररर पपपपरररर))))¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 551 >>>>.... पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन ककककाााा ननननाााामममम ससससYYYYककककटटटट VVVV>>>>ययययाााा5555वव वव ययययनननन ललललााााइइइइनननन कककक.... पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा सससस..ंं..ंं कककक.... एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ललललबबंंबबंं ााााईईईई ममममााााहहहह ससससaaंंaaंं यय यय ाााा ((((ससससीीीीककककेेेेएएएएमममम)))) IIIIIIIIIIII.... 444400000000 ककककेेेेववववीीीी ललललााााइइइइनननन (cid:27)(cid:27) (cid:27)(cid:27) क(cid:19)4ीय 8े9 1 वारंगल म(cid:19) रामगुंडम्-mD म ाम डी/सी पावरिSड 26 जुलाई -09 एलआईएलओ 2 कराईकुडी म(cid:19) मदरु ई (पीजी) - डी/सी पावरिSड 98 जुलाई -09 9ची (पीजी) 1 स6कट का एलआईएलओ 3 िभवाडी-आगरा डी/सी पावरिSड 418 अग,त -09 4 िभनमल म(cid:19) कंकरोली-जेरदा .थम डी/सी पावरिSड 55 अग,त -09 स6कट का एलआईएलओ 5 नेवेली (िव,त ार) ि,वच याड.( - 2xएस/ पावरिSड 3 िसतंबर-09 नेवेली (मौजूदा) ि,वच याड ( सी 6 बाढ़ म(cid:19) कहलगांव-पटना डी/सी पावरिSड 104 अ(cid:25)ट ूबर-09 एलआईएलओ 7 अकोला-औरंगाबाद डी/सी पावरिSड 482 7दसDब र-09 8 मेिजया म(cid:19) मैथन-जमशेदपुर .थम डी/सी पावरिSड 100 फरवरी-10 स6कट एलआईएलओ 9 िभवाडी-मोगा डी/सी पावरिSड 702 माच(-10 10 कोलदाम-नालागढ़ ((cid:25)व ैद) डी/सी पावरिSड 90 माच(-10 पावरि(cid:6)ड ( भाग) 11 कंकरोली-जोधपुर डी/सी पावरिSड 193 माच(-10 12 गुडगांव म(cid:19) ब(cid:18)ल भगढ़-िभवाडी डी/सी पावरिSड 68 माच(-10 एलआईएलओ 13 दमोह – भोपाल (एमपीईबी) डी/सी पावरिSड 430 माच(-10 14 उधमालपेट-अरौर डी/सी पावरिSड 131 माच(-10 15 पु(cid:143)डुचेरी म(cid:19) नेवेली-†ीपेरंबदरू डी/सी पावरिSड 26 माच(-10 लाइन का एलआईएलओ 16 ितWनेवेली (पीजी) - एडामोन एम/सी पावरिSड 327 माच(-10 (केएसईबी) बa-स6कट लाइन 17 हासन म (cid:19) तलग*ु प ा डी/सी पावरिSड 148 माच(-10 (केपीटीसीएल) – नीलमंगला (केपीटीसीएल) के मौजूदा .थम स6कट का एलआईएलओ552 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ककककुुुुलललल 444400000000 ककककेेेेववववीीीी ललललााााइइइइनननन (cid:27)(cid:27) (cid:27)(cid:27)((((ससससीीीीएएएएसससस)))) 3333444400001111 ककककुुुुलललल 222222220000 ककककेेेेववववीीीी ललललााााइइइइनननन (cid:27)(cid:27) (cid:27)(cid:27)((((ससससीीीीएएएएसससस)))) 0000 ककककुुुुलललल ससससीीीीएएएएसससस ((((777766665555 5555555511115555 ++++444400000000++++222222220000++++111133332222 ककककेेेेववववीीीी पपपपीीीीजजजजीीीी ममममाााा3333)))) >>>>.... ललललााााइइइइनननन ससससYYYYककककटटटट कककक.... VVVV>>>>ययययाााा5555वव वव ययययनननन ललललााााइइइइनननन कककक.... पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेे सससस..ंं..ंं ससससaaंंaaंं यय यय ाााा एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ललललबबंंबबंं ााााईईईई ककककाााा ममममााााहहहह ((((ससससीीीीककककेेेेएएएएमममम)))) रररराााा""""यय यय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ((((444400000000 ककककेेेेववववीीीी ललललााााइइइइनननन))))(cid:27)(cid:27)(cid:27)(cid:27) 1 िवजयवाडा टीपी पर एम/सी आं” .दशे 24 जुलाई -09 †ीशेलम-नुनम एलआईएलओ 2 भूपालप(cid:18)ल ी’वारेगल डी/सी आं” .दशे 90 फरवरी-10 3 मेरामुंदली-म(cid:19)डाल (चंडका) डी/सी उड़ीसा 201 अग,त -09 4 िहसार टीपीएस म(cid:19) िहसार- डी/सी ह(cid:10)रयाणा 3 जुलाई -09 मोगा .थम स6कट का एलआईएलओ 5 िहसार-फतेहाबाद (.थम एस/सी ह(cid:10)रयाणा 41 जनवरी-10 स6कट) 6 चोरिनया म(cid:19) असोज-अमरेली डी/सी गुजरात 39 जुलाई -09 .थम स6कट का एलआईएलओ 7 सूरतगढ़ एसटीपीएस-बीकानरे एस/सी राज,थ ान 162 िसतंबर-09 8 Gहदअु न म(cid:19) धौलपुर-हीरापुरा डी/सी राज,थ ान 8 7दसDब र-09 एलआईएलओ 9 नया खेपरखेडा म(cid:19) करोडी- डी/सी महाराJ(cid:26) 3 नवDब र-09 चं4पुरा एलआईएलओ 10 चाकन म(cid:19) लोनीखंड-पडघे का डी/सी महाराJ(cid:26) 2 7दसDब र-09 एलआईएलओ ववववषषषष (cid:3)(cid:3) (cid:3)(cid:3)ककककेेेे ददददौौौौरररराााानननन पपपपररूूररूू ीीीी कककक(cid:18)(cid:18)(cid:18)(cid:18) गगगगईईईई ककककुुुुलललल ससससीीीीककककेेेेएएएएमममम 444400000000 ककककेेेेववववीीीी ललललााााइइइइनननन (cid:24)(cid:24) (cid:24)(cid:24) 555577773333 ((((ससससबबबब----(cid:23)(cid:23)(cid:23)(cid:23)टट टट ेेेेशशशशनननन)))) रररराााा""""यय यय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ((((222222220000 ककककेेेेववववीीीी ललललााााइइइइनननन))))(cid:27)(cid:27)(cid:27)(cid:27) 1 एसटब्अीपीएस-भ4ा एस/सी राज,थ ान 114 अ.ैल-09 2 राज पिZम-बारमर डी/सी राज,थ ान 27 अ.लै -09 3 रेनवाल म (cid:19) हीरापुरा-कूका डी/सी राज,थ ान 49 मई-09 एलआईएलओ¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 553 4 छाबडा-बारन-दहे रा एस/सी राज,थ ान 138 जून-09 5 कंकरोली (पीजी)-दबे ारी एस/सी राज,थ ान 63 अग,त -09 6 भीलवाडा 400 केवी सब- डी/सी राज,थ ान 10 िसतंबर-09 ,ट ेशन म(cid:19) भीलवाडा – पाली एलआईएलओ 7 भीलवाडा 400 केवी सब- डी/सी राज,थ ान 6 िसतंबर-09 ,ट ेशन म(cid:19) भीलवाडा – बाली एलआईएलओ 8 सेलDब र म(cid:19) 132 केवी सब- एस/सी राज,थ ान 87 िसतंबर-09 ,ट ेशन के िलए एलआईएलओ और बांसवाडा अंत स े सेलDब र तक बांसवाडा-दबे ेर के िuतीय स6कट कV G,(cid:26)ग 9 Gहदअु न (400 केवी)-Gहदअु न डी/सी राज,थ ान 16 िसतंबर-09 (220 केवी) 10 400 केवी एसटीपी सूरतगढ़- एस/सी राज,थ ान 3.5 िसतंबर-09 बीकानेर के िलए एसटीपीएस के अंत म(cid:19) Gलक लाइन 11 िगराल एसटीपीएस-बारमर एस/सी राज,थ ान 35 नवDब र-09 िuतीय स6कट 12 बैतू-बलो9ा एस/सी राज,थ ान 48 नवDब र-09 13 िगराल एसटीपीएस-बैतू एस/सी राज,थ ान 55 7दसDब र-09 14 जीएसएस सेज-। म(cid:19) ब,स ी– डी/सी राज,थ ान 15 जनवरी-10 फुलेरा का एलआईएलओ 15 कंकरोली (पीजी)-कंकरोली एस/सी राज,थ ान 8 माच(-10 16 बीकानेर (400 केवी) म(cid:19) डी/सी राज,थ ान 37 माच(-10 बीकानेर-नागौर एलआईएलओ 17 कुछामन म(cid:19) मेरटा-मकराना एस/सी राज,थ ान 108 माच(-10 18 132 केवी जीएसएस सब- डी/सी राज,थ ान 16 माच(-10 ,ट ेशन पर बांसवाडा-दवे ारी के .थम स6कट का एलआईएलओ 19 जीएसएस धोड़ म(cid:19) सीकर- डी/सी राज,थ ान 6 माच(-10 कुछामन एलआईएलओ 20 गुलाबपुरा म(cid:19) केटीपीएस-बेवर डी/सी राज,थ ान 13 माच(-10 के .थम स6कट का एलआईएलओ554 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 21 400 केवी अकाई (जैसलमरे ) डी/सी राज,थ ान 12 माच(-10 म(cid:19) 400 केवी जीएसएस अकाई और 220 केवी बेस के पaचं खंड म(cid:19) डी/सी लाइन 22 अजवाल म(cid:19) मोगा-जगरांव डी/सी पंजाब 3 अ.ैल-09 एलआईएलओ 23 मजीथा (िमि†त लूप) म(cid:19) फतेह डी/सी पंजाब 5 जुलाई -09 गढ़ छु(cid:10)रयन-िसिवल लाइन अ—तसर के .थम स6कट का एलआईएलओ 24 मजीथा (िमि†त लूप के िबना) डी/सी पंजाब 5 7दसDब र-09 म(cid:19) फतेह गढ़ छु(cid:10)रयन-िसिवल लाइन अ—तसर के .थम स6कट का एलआईएलओ 25 ऋिषकेश-मनेरीबाली चरण-II एस/सी उ&त राखंड 79 मई-09 (तृतीय स6कट) 26 घनाली-चंबा एस/सी उ&त राखंड 35 अ(cid:25)ट ूबर-09 27 भौती (पीजी)-उरई एस/सी उ&त र .दशे 90 अ.ैल-09 28 रोसा - हरदोई (स6कट-I) एस/सी उ&त र .दशे 59 जुलाई -09 29 रोसा-शाहजहांपुर -I एस/सी उ&त र .दशे 22 जुलाई -09 30 सोहावल म(cid:19) सु(cid:18)त ानपुर-ग^डा डी/सी उ&त र .दशे 26 जनवरी-10 एलआईएलओ 31 दादरी म(cid:19) खुजा(-मुरादनगर डी/सी उ&त र .दशे 24 फरवरी-10 एलआईएलओ 32 रोसा-सहारनपुर -II एस/सी उ&त र .दशे 22 माच(-10 33 गुडगांव से(cid:25)ट र 56 म(cid:19) प(cid:18)ल ी- डी/सी ह(cid:10)रयाणा 2 अग,त -09 गुडगांव से(cid:25)ट र 52 का एलआईएलओ 34 7करोडी-मसूदपुर डी/सी ह(cid:10)रयाणा 24 अ(cid:25)ट ूबर-09 35 7करोडी म(cid:19) जdद-िहसार डी/सी ह(cid:10)रयाणा 26 माच(-10 एलआईएलओ 36 मसूदपुर म(cid:19) जdद-िहसार डी/सी ह(cid:10)रयाणा 4 माच(-10 एलआईएलओ 37 बवाना डीआईडीसी (भाग म(cid:19) डी/सी 7द(cid:18)ल ी 14 नवDब र-09 लूप) म(cid:19) बवाना-नरेला एलआईएलओ 38 नरGसहपुर म(cid:19) जबलपुर- डी/सी मcय .दशे 4 अ.ैल-09 इटारसी (िuतीय स6कट) का एलआईएलओ¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 555 39 होसंगाबाद म(cid:19) भोपाल- डी/सी मcय .दशे 12 अ.ैल-09 इटारसी एलआईएलओ .थमस6कट 40 Gछदवाड़ा - िसवनी (पीजी) डी/सी मcय .दशे 134 अ.ैल-09 41 सागर म(cid:19) दमोह-बीना डी/सी डी/सी मcय .दशे 15 अ.ैल-09 .थम स6कट का एलआईएलओ 42 बाद नगर म(cid:19) पीतमपुरा- डी/सी मcय .दशे 20 अ.ैल-09 रतलाम के िuतीय स6कट एलआईएलओ 43 मकरोिनया-सागर ((cid:26)े(cid:25)श न डी/सी मcय .दशे 10 जुलाई -09 फVडर) 44 होसंगाबाद म(cid:19) इटारसी- डी/सी मcय .दशे 11 जुलाई -09 भोपाल िuतीय स6कट एलआईएलओ 45 सुजालपुर-राजगढ़ डी/सी मcय .दशे 144 िसतंबर-09 46 िपप(cid:10)रया म(cid:19) जबलपुर-इटारसी डी/सी मcय .दशे 7 अ(cid:25)ट ूबर-09 के .थम स6कट का एलआईएलओ 47 भोपाल (400 केवी)-अiत ा डी/सी मcय .दशे 194 जनवरी-10 सब-,ट ेशन 48 हिं डया म(cid:19) सतपुरा-इटारसी डी/सी मcय .दशे 170 माच(-10 .थम स6कट का एलआईएलओ 49 थेयूर-मगरपKा (उस@-तालेगांव एस/सी महाराJ(cid:26) 10 अ.ैल-09 िuतीय स6कट) 50 सोमकर म (cid:19) नWे ल-(cid:26)ोDब े डी/सी महाराJ(cid:26) 1 अ.ैल-09 एलआईएलओ 51 Gहजवाडी-।। म(cid:19) िपरंगूट– डी/सी महाराJ(cid:26) 10 िसतंबर-09 Gहजवाडी-। एलआईएलओ 52 बारमिण एSो, शेतपाल म(cid:19) डी/सी महाराJ(cid:26) 8 नवDब र-09 िभगवान-बारामती एलआईएलओ 53 Gहजवाडी-।। म(cid:19) कंदलगांव- डी/सी महाराJ(cid:26) 12 नवDब र-09 Gचचवाड डी/सी एलआईएलओ 54 छाकन मैसस( वो(cid:25)स वैगन डी/सी महाराJ(cid:26) 5 7दसDब र-09 55 765 केवी दवे ली सब-,ट ेशन डी/सी महाराJ(cid:26) 20 फरवरी-10 म(cid:19) वधा(-बदनेरा एलआईएलओ 56 ऐरोली (नालेज पाक() म(cid:19) डी/सी महाराJ(cid:26) 1 माच(-10 कलवा-नािसक (स6कट-III) का556 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] एलआईएलओ 57 चोरिनया बाला डी/सी गुजरात 59 जून-09 58 कोDब ा म(cid:19) स6कट-1 पर वैव- डी/सी गुजरात 10 जुलाई -09 जगिडया एलआईएलओ 59 रायपुर-दधु रेज डी/सी गुजरात 20 जुलाई -09 60 टुंडा यूएमपीपी – नैनीख(cid:25)ख र एस/सी गुजरात 15 7दसDब र-09 61 अदानी (मुं4ा) – वरसाना डी/सी गुजरात 166 जनवरी-10 62 मगरौल-मोभा डी/सी गुजरात 219 फरवरी-10 63 रायगढ़400केवी(पीजीसीआईएल) एस/सी छ&त ीसगढ़ 21 जून-09 सब-,ट ेशन – रायगढ़ 64 खेडामारा -राजनांदगांव डी/सी छ&त ीसगढ़ 50 िसतंबर-09 65 भाटापारा 400 केवी डी/सी छ&त ीसगढ़ 27 जनवरी-10 (पीजीसीआईएल)– सुहले ा (भाटापारा) 66 अमोना म(cid:19) को(cid:18)ह ापुर –प^डा डी/सी गोवा 3 नवDब र-09 .थम स6कट का एलआईएलओ 67 दाबापेट (नेलमंगला) मे डी/सी कना(टक 2 अ.ैल-09 कदौर-नेलमंगला एलआईएलओ 68 िहरीयूर-त(cid:18)ल ाक डी/सी कना(टक 80 अ.ैल-09 69 इंदी-बवानाबेगेवाडी डी/सी कना(टक 170 अ.ैल-09 70 निजहारी-aबली और aबली- डी/सी कना(टक 3 िसतंबर-09 गदज लाइन के बीच Gलक लाइन 71 मुडौल/वजाराम&त ी म(cid:19) डी/सी कना(टक 2 िसतंबर-09 महािलगापुर-बगलकोट एलआईएलओ 72 िबदादी-कोथीपुरा (रामनगर) एम/सी कना(टक 36 िसतंबर-09 73 यूटीपीएस-नंदीकुर – खेमार डी/सी, कना(टक 48 अ(cid:25)ट ूबर-09 (आंिशक Wप स े बa-स6कट एम/सी बa-वो(cid:18)ट ेज टावर & आंिशक Wप से डी/सी टावर) 74 स\दती म(cid:19) महाGलगापुर – डी/सी कना(टक 9 7दसDब र-09 aबली लाइन का एलआईएलओ 75 बतीपुरा-कडाकोला डी/सी कना(टक 44 फरवरी-10¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 557 76 मनाली- ट^िडयारपेट डी/सी तिमलनाडु 18 मई-09 77 मीलािवKन – मैसस( इंड भारत एस/सी तिमलनाडु 9 जुलाई -09 78 कराईकुडी 400 केवी सब- डी/सी तिमलनाडु 7.5 अग,त -09 ,ट ेशन पर कराईकुडी – पुडकोKई एलआईएलओ 79 पुगालूर 400 केवी सब-,ट ेशन डी/सी तिमलनाडु 18 अग,त -09 पुगालूर-अलुंदरू एलआईएलओ 80 अम&थ ापुरम - छे(cid:25)क ानूरानी डी/सी तिमलनाडु 110 अ(cid:25)ट ूबर-09 पर एस/सी 81 बैन िRत म(cid:19) ट^िडयारपेट- डी/सी तिमलनाडु 2 नवमब ् र-09 माइलापोर एलआईएलओ 82 अरौर 400 केवी - अरौर 230 डी/सी तिमलनाडु 43 जनवरी-10 केवी सब-,ट ेशन 83 मेलूिमछामपKी – कॉमन एस/सी तिमलनाडु 58 जनवरी-10 *व ाइंट – िमवाडी 84 †ीपेरDब दरु 400 केवी सब- डी/सी तिमलनाडु 15 जनवरी-10 पर ,ट ेशन - †ीपेरDब दरु िसपकोट एस/सी 230 केवी सब-,ट ेशन 85 ितWनेवेली 400 केवी / - डी/सी तिमलनाडु 69 फरवरी-10 पर उYाथूर एस/सी 86 मैसस( इंड भारत- डी/सी & तिमलनाडु 154 माच(-10 छे(cid:25)क ानूरानी एस/सी 87 इड*प ोन म(cid:19) कायमकुलम- डी/सी केरल 17 जून-09 इडामन (स6कट-2) एलआईएलओ 88 वडाकारा सब-,ट ेशन के िलए डी/सी केरल 2 अग,त -09 टेप लाइन 89 गेरीिवडी - बो™पे (cid:18)ल ीपेटा डी/सी आं” .दशे 44 जुलाई -09 पर एस/सी 90 बो™पे (cid:18)ल ीपेटा –टे(cid:25)क ाली डी/सी आं” .दशे 44 जुलाई -09 पर एस/सी 91 आरटीपीपी-पुलीव(cid:19)दलु ा डी/सी आं” .दशे 82 7दसDब र-09 92 नराव( पटे म (cid:19) वीटी-पोिड(cid:18)ल ी डी/सी आं” .दशे 4 7दसDब र-09 एलआईएलओ 93 जपला म(cid:19) सोनेनगर-गढ़वा डी/सी झारखंड 8 मई-09 डी/सी एलआईएलओ558 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 94 िबहार शरीफ- बेगुसराय डी/सी िबहार 150 नवDब र-09 95 बुधीपडार-बोलंगीर डी/सी उड़ीसा 312 जनवरी-10 96 (cid:10)टनु7कया- नामWप डी/सी असम 80 अ.ैल-09 ववववषषषष (cid:3)(cid:3) (cid:3)(cid:3)ककककेेेे ददददौौौौरररराााानननन पपपपररूूररूू ीीीी कककक(cid:18)(cid:18)(cid:18)(cid:18) गगगगईईईई ककककुुुुलललल ससससीीीीककककेेेेएएएएमममम 222222220000 ककककेेेेववववीीीी ललललााााइइइइनननन (cid:24)(cid:24) (cid:24)(cid:24) 4444333322225555 ((((ससससबबबब----(cid:23)(cid:23)(cid:23)(cid:23)टट टट ेेेेशशशशनननन)))) 444400000000 ककककेेेेववववीीीी ललललााााइइइइनननन कककक.... ((((ििििननननजजजजीीीी (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे )))) 1 मुं4ा-दहे गाम डी/सी अदानी पावर 868 जुलाई -09 िलिमटेड 2 थोरंग(cid:18)ल ू जेएसड(cid:4)(cid:18) य ू सब- डी/सी जेड(cid:4)(cid:18) य ू एनजC 16 अग,त -09 ,ट ेशन म(cid:19) आरटीपीएस-गुXटूर िलिमटेड एलआईएलओ 3 कोडाप(cid:18)ल ी-नु3न ा डी/सी ल(cid:19)को 44 अ(cid:25)ट ूबर-09 ववववषषषष (cid:3)(cid:3) (cid:3)(cid:3)ककककेेेे ददददौौौौरररराााानननन पपपपररूूररूू ीीीी कककक(cid:18)(cid:18)(cid:18)(cid:18) गगगगईईईई ककककुुुुलललल ससससीीीीककककेेेेएएएएमममम 444400000000 ककककेेेेववववीीीी ललललााााइइइइनननन (cid:24)(cid:24) (cid:24)(cid:24) 999922228888 ((((पपपपााााववववरररर----(cid:23)(cid:23)(cid:23)(cid:23)टट ट ट ेेशशेेशशनननन)))) ििििननननजजजजीीीी (cid:31)(cid:31)(cid:31)(cid:31) ेे ेे 1 अखाकोल-पूना डी/सी टोर(cid:19)ट पावर 72 मई-09 2 अखाकोल-भतर डी/सी टोर(cid:19)ट पावर 136 मई-09 3 अखाकोल-वेद (डभोली) डी/सी टोर(cid:19)ट पावर 52 जून-09 4 बुडगे-बुडगे-को,ब ा डी/सी सीईसी 170 फरवरी-10 ककककुुुुलललल ससससीीीीककककेेेेएएएएमममम 222222220000 ककककेेेेववववीीीी ललललााााइइइइनननन (cid:24)(cid:24) (cid:24)(cid:24) 444433330000 ((((पपपपीीीीएएएएसससस )))) ववववषषषष (cid:3)(cid:3) (cid:3)(cid:3)ककककेेेे ददददौौौौरररराााानननन पपपपररूूररूू ीीीी कककक(cid:18)(cid:18)(cid:18)(cid:18) गगगगईईईई ककककुुुुलललल ससससीीीीककककेेेेएएएएमममम 444400000000 ककककेेेेववववीीीी ललललााााइइइइनननन (cid:24)(cid:24)(cid:24)(cid:24) 4444999900002222 ((((अअअअििििखखखखलललल भभभभााााररररतततत)))) ववववषषषष (cid:3)(cid:3) (cid:3)(cid:3)ककककेेेे ददददौौौौरररराााानननन पपपपररूूररूू ीीीी कककक(cid:18)(cid:18)(cid:18)(cid:18) गगगगईईईई ककककुुुुलललल ससससीीीीककककेेेेएएएएमममम 222222220000 ककककेेेेववववीीीी ललललााााइइइइनननन (cid:24)(cid:24)(cid:24)(cid:24) 4444777755555555 ((((अअअअििििखखखखलललल भभभभााााररररतततत))))¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 559 2222000000009999----11110000 ककककेेेे ददददौौौौरररराााानननन (cid:12)(cid:12)(cid:12)(cid:12)थथ थथ ााााििििपपपपतततत ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट टट ेेेेशशशशनननन >>>>.... ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट ट ट ेेशशेेशशनननन ववववोोोो4444टट टट ेेजजेेजज VVVV>>>>ययययाााा5555वव वव ययययनननन (cid:7)(cid:7)(cid:7)(cid:7)ममममतततताााा पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा सससस..ंं..ंं अअअअननननपपुुपपुु ाााातततत एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ममममााााहहहह ((((ककककेेेेववववीीीी////ककककेेेेववववीीीी)))) ((((एएएएमममम डडडड(cid:2)(cid:2)(cid:2)(cid:2)44 44 यय यय //ूू//ूू एएएएममममववववीीीीएएएए)))) IIII.... 555500000000 ककककेेेेववववीीीी एएएएचचचचववववीीीीडडडडीीीीएएएएसससस ((((ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट ट ट ेेशशेेशशनननन)))) 1 बिलया और िभवाडी म(cid:19) कनवट(र 1250 माच(-10 ,ट ेशन (2x1250 मेगावाट) ककककुुुुलललल ((((कककक(cid:27)(cid:27)(cid:27)(cid:27)CCCCीीीीयययय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे )))) 1111222255550000 >>>>.... ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट ट ट ेेशशेेशशनननन ववववोोोो4444टट टट ेेजजेेजज VVVV>>>>ययययाााा5555वव वव ययययनननन (cid:7)(cid:7)(cid:7)(cid:7)ममममतततताााा पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा सससस..ंं..ंं अअअअननननपपुुपपुु ाााातततत एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ममममााााहहहह ((((ककककेेेेववववीीीी////ककककेेेेववववीीीी)))) ((((एएएएमममम डडडड(cid:2)(cid:2)(cid:2)(cid:2)44 44 यय यय ूू ूू //// एएएएममममववववीीीीएएएए)))) IIIIIIII.... 444400000000 ककककेेेेववववीीीी ((((ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट टट ेेेेशशशशनननन)))) क(cid:19)4ीय 8े9 1 ि9व(cid:19)4म (पीजी) (िव,त ार) 400/220 पावरिSड 315 जून-09 (1x315) 2 वारंगल सब-,ट ेशन (2x315) 400/220 पावरिSड 630 जुलाई -09 3 कराईकुडी सब-,ट ेशन 400/220 पावरिSड 630 जुलाई -09 (2x315) 4 िभमनाल सब-,ट ेशन (2x315) 400/220 पावरिSड 630 अग,त -09 .थम आईसीटी 5 पुगालूर / (2x315) 400/222 पावरिSड 630 अग,त -09 6 WडकV / (िuतीय आईसीटी) 400/220 पावरिSड 315 माच(-10 7 लुिधयाना(तृतीय आईसीटी) 400/220 पावरिSड 315 माच(-10 8 िहसार तृतीय आईसीटी 400/220 पावरिSड 315 माच(-10 (1x315) 9 गुडगांव जीआईएस सब-,ट ेशन 400/220 पावरिSड 315 माच(-10 (2x315) 10 वधा( सब ,ट ेशन(2x315) 400/220 पावरिSड 315 माच(-10 िuतीय (cid:26)ांसिमशन 11 सोलापुर 400/220 पावरिSड 630 माच(-10560 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 12 अरासुर सब-,ट ेशन (2x315) 400/220 पावरिSड 630 माच(-10 13 प^िडचेरी सब-,ट ेशन (2x315) 400/220 पावरिSड 630 माच(-10 14 हासन सब-,ट ेशन 400/220 पावरिSड 630 माच(-10 ककककुुुुलललल ((((कककक(cid:27)(cid:27)(cid:27)(cid:27)CCCCीीीीयययय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे )))) 6666999933330000 1 म(cid:19)ढ़ाल (2x315) 400/220 उड़ीसा 630 अग,त -09 2 दगु ा(पुर (6x105) 400/220 पिZम बंगाल 630 7दसDब र- 09 3 चाकन सब-,ट ेशन (3x105) 400/220 महाराJ(cid:26) 315 7दसDब र- 09 4 जेजूरी (3x167) 400/220 महाराJ(cid:26) 500 जनवरी-10 5 बीकानेर / (1X315) 400/220 राज,थ ान 315 माच(-10 ककककुुुुलललल ((((रररराााा""""यय यय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे )))) 2222333399990000 >>>>.... ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट ट ट ेेशशेेशशनननन ववववोोोो4444टट टट ेेजजेेजज VVVV>>>>ययययाााा5555वव वव ययययनननन (cid:7)(cid:7)(cid:7)(cid:7)ममममतततताााा पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा सससस..ंं..ंं अअअअननननपपुुपपुु ाााातततत एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ममममााााहहहह ((((ककककेेेेववववीीीी////ककककेेेेववववीीीी)))) ((((एएएएमममम डडडड(cid:2)(cid:2)(cid:2)(cid:2)44 44 यय यय ूू ूू //// एएएएममममववववीीीीएएएए)))) llllIIIIIIII.... 222222220000 ककककेेेेववववीीीी ((((ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट टट ेेेेशशशशनननन)))) कककक(cid:27)(cid:27)(cid:27)(cid:27)CCCCीीीीयययय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे 1 िसतारगंज िuतीय 220/132 पावरिSड 100 जुलाई -09 आईसीटी 2 कोिपली सब-,ट ेशन 220/132 पावरिSड 160 माच(-10 िव,त ार 3 दीमापुर सब-,ट ेशन 220/132 पावरिSड 100 माच(-10 िव,त ार ककककुुुुलललल ((((कककक(cid:27)(cid:27)(cid:27)(cid:27)CCCCीीीीयययय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे )))) 333366660000 रररराााा""""यय यय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे 1 गुडगांव सुदढ़ृ ीकरण 220/66 ह(cid:10)रयाणा 100 अ.ैल-09 (से(cid:25)ट र-52क) तृतीय (cid:26)ांसिमशन 2 इशरवाल 220/132 ह(cid:10)रयाणा 100 अ.ैल-09 3 पेहोबा सुदढ़ृ ीकरण (100- 220/132 ह(cid:10)रयाणा 50 जून-09 50) 4 छीका सुदढ़ृ ीकरण (तृतीय) 220/132 ह(cid:10)रयाणा 100 जून-09 5 िनGसग सुदढ़ृ ीकरण 220/132 ह(cid:10)रयाणा 100 जून-09 (तृतीय )¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 561 6 भूना (िuतीय (cid:26)ांसिमशन) 220/132 ह(cid:10)रयाणा 100 जुलाई -09 7 गुड़गांव सुदढ़ृ ीकरण 220/66 ह(cid:10)रयाणा 100 अग,त -09 (से(cid:25)ट र-56) 8 करतारपुर (िव,त ार) 220/66 पंजाब 100 अ.ैल-09 (िuतीय) 9 मोहाली-II (नया) 220/66 पंजाब 100 अग,त -09 10 बाघा पुराना (भूिमगत) 220/66 पंजाब 100 अग,त -09 11 मजीथा (भूिमगत) 220/66 पंजाब 100 अग,त -09 12 अिजतवाल 220/66 पंजाब 100 अ(cid:25)ट ूबर-09 13 रेनवाल 220/132 राज,थ ान 100 मई-09 14 बारन 220/132 राज,थ ान 100 मई-09 15 भ4ा 220/132 राज,थ ान 100 मई-09 16 मGह4ा ईजेड 220/132 राज,थ ान 100 माच(-10 17 गुलाबपुरा 220/132 राज,थ ान 100 माच(-10 18 धौड़ 220/132 राज,थ ान 100 माच(-10 19 डीआईडीसी बवाना 220/66 7द(cid:18)ल ी 100 जुलाई -09 (िuतीय (cid:26)ांसिमशन) 20 ब,त ी सुदढ़ृ ीकरण (160- 220/132 उ&त र .दशे 60 अ.ैल-09 100) 21 सु(cid:18)त ानपुर सुदढ़ृ ीकरण 220/132 उ&त र .दशे 60 अग,त -09 (160-100) 22 िसकंदराबाद 220/132 उ&त र .दशे 100 अ(cid:25)ट ूबर-09 23 मुजBफरपगर 220/132 उ&त र .दशे 100 जनवरी-10 24 सोहावल 220/132 उ&त र .दशे 100 जनवरी-10 25 सोनखर 220/33 महाराJ(cid:26) 50 अ.ैल-09 26 तमबनC 220/33 महाराJ(cid:26) 25 अ.ैल-09 27 मगरपKा 220/22 महाराJ(cid:26) 150 अ.ैल-09 28 वथर 220/132 महाराJ(cid:26) 100 जून-09 29 वथर 220/33 महाराJ(cid:26) 50 जून-09 30 तेमघर 220/22 महाराJ(cid:26) 50 अग,त -09 31 वशाला 220/22 महाराJ(cid:26) 25 अग,त -09 32 Gहजेवाडी II सब-,ट ेशन 220/22 महाराJ(cid:26) 50 अ(cid:25)ट ूबर-09 33 महापे (तृतीय (cid:26)ांसिमशन) 220/22 महाराJ(cid:26) 50 जनवरी-10562 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 34 तेमघर (िuतीय (cid:26)ांस.) 220/22 महाराJ(cid:26) 50 जनवरी-10 35 महद 220/22 महाराJ(cid:26) 50 माच(-10 36 ऐरोली (नॉलेज पाक() 220/22 महाराJ(cid:26) 50 माच(-10 37 पनवेल (तृतीय 220/33 महाराJ(cid:26) 50 माच(-10 (cid:26)ांसिमशन) 38 सीधी सब-,ट ेशन 220/132 मcय .दशे 160 मई-09 39 राजगढ़ ((cid:4)य ावरा) 220/132 मcय .दशे 160 िसतंबर-09 40 बैरागढ़ 220/132 मcय .दशे 160 िसतंबर-09 41 नागदा 220/132 मcय .दशे 160 िसतंबर-09 42 इंदौर (दि8ण जोन) 220/132 मcय .दशे 160 िसतंबर-09 43 बादनगर 220/132 मcय .दशे 160 अ(cid:25)ट ूबर-09 44 Gछदवाडा 220/132 मcय .दशे 160 नवDब र-09 45 िपर(cid:10)रया 220/132 मcय .दशे 160 जनवरी-10 46 आ,थ ा 220/132 मcय .दशे 100 जनवरी-10 47 बडनगर (िuतीय 220/132 मcय .दशे 160 जनवरी-10 (cid:26)ांसफाम(र) 48 भोपाल (चंबलl) 220/132 मcय .दशे 100 माच(-10 अित(cid:10)र(cid:25)त (cid:26)ांसिमशन 49 राजनांदगांव 220/132 छ&त ीसगढ़ 160 िसतंबर-09 50 रायगढ़ 220/132 छ&त ीसगढ़ 160 जुलाई -09 51 अमोना (2x50 ) 220/33 गोवा 100 नवDब र-09 52 बाला (2x50) 220/11 गुजरात 100 नवDब र-09 53 दधु रेज (2x25) 220/11 गुजरात 50 नवDब र-09 54 त(cid:18)ल ाक (िuतीय 220/66 कना(टक 100 अ.ैल-09 (cid:26)ांसिमशन) 55 ह,क ोटे 220/66 कना(टक 100 अ.ैल-09 56 दाबापेट (नीलमंगला) 220/66 कना(टक 100 अ.ैल-09 57 एचआर लेआउट (2x150- 220/66 कना(टक 100 अ.ैल-09 2x100) 58 िशरालकोपा 220/110 कना(टक 100 अ.ैल-09 59 Gसधनूर (.थम) 220/110 कना(टक 100 अ.ैल-09 60 इंदी (2x100) 220/110 कना(टक 200 अ.ैल-09 61 नागानाथपुरा (.थम 220/66 कना(टक 100 जून-09 (cid:26)ांस.)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 563 62 वजरामKी (2x100) 220/110 कना(टक 200 अ(cid:25)ट ूबर-09 63 रानेबे3न ूर 220/110 कना(टक 100 अ(cid:25)ट ूबर-09 (अित(cid:10)र(cid:25)त .(cid:26)ांसिमशन) 64 कुसतागी 220/110 कना(टक 100 नवDब र-09 (अित(cid:10)र(cid:25)त .(cid:26)ांसिमशन) 65 स\द&त ी 220/110 कना(टक 100 माच(-10 66 नागनाथपुरा (िuतीय 220/66 कना(टक 100 7दसDब र-09 (cid:26)ांसिमशन) 67 †ीपेरDब दरु 230/110 तिमलनाडु 100 अ.ैल-09 एसआईपीसीओटी 68 नो7कया 230/110 तिमलनाडु 100 अ.ैल-09 69 पो3न ापुरम् (अित(cid:10)र(cid:25)त . 230/110 तिमलनाडु 100 अ.ैल-09 (cid:26)ांसिमशन) 70 कड*प रे ी तृतीय (80 से 230/110 तिमलनाडु 20 अ.ैल-09 100 एमवीए) 71 प(cid:18)ल ादाम अित(cid:10)र(cid:25)त 230/110 तिमलनाडु 100 मई-09 (cid:26)ांसिमशन 72 मे&त ूर (िव,त ार) 230/110 तिमलनाडु 100 जून-09 73 पेरDब लूर (िव,त ार) 230/110 तिमलनाडु 50 जुलाई -09 (100-50) 74 अरनी (अित(cid:10)र(cid:25)त 230/110 तिमलनाडु 80 अग,त -09 (cid:26)ांसिमशन) 75 िथWवलम् अित(cid:10)र(cid:25)त 230/110 तिमलनाडु 100 िसतंबर-09 (cid:26)ांसिमशन 76 अलुंदरू (िव,त ार) (100- 230/110 तिमलनाडु 50 िसतंबर-09 50) 77 Amयूिनटthapयूिनटram 230/33 तिमलनाडु 50 अ(cid:25)ट ूबर-09 अित(cid:10)र(cid:25)त .(cid:26)ांसिमशन 78 र(cid:19)गनाथपुरम् अित(cid:10)र(cid:25)त 230/110 तिमलनाडु 100 अ(cid:25)ट ूबर-09 (cid:26)ांसिमशन 79 कोरातरू सुदढ़ृ ीकरण (80 230/110 तिमलनाडु 20 अ(cid:25)ट ूबर-09 से 100 एमवीए) 80 बैन िRज (जीएमआर 230/110 तिमलनाडु 100 नवDब र-09 वावी)564 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 81 िव3न ामंगलम सुदढ़ृ ीकरण 230/110 तिमलनाडु 50 नवDब र-09 (100-50) 82 नेथीमेद ू सुदढ़ृ ीकरण 230/110 तिमलनाडु 20 7दसDब र-09 (100- 80) 83 िथWवलम् सुदढ़ृ ीकरण 230/110 तिमलनाडु 25 जनवरी-10 (100-75) 84 उ!ाथूर 230/110 तिमलनाडु 100 माच(-10 85 औथाकलमांडपम् (तृतीय 230/110 तिमलनाडु 100 माच(-10 (cid:26)ांस.) 86 सलेम सुदढ़ृ ीकरण (100- 230/110 तिमलनाडु 20 माच(-10 80) 87 वदाकरा 220/110 केरल 100 अग,त -09 88 वदाकरा िuतीय 220/110 केरल 100 7दसDब र-09 (cid:26)ांसिमशन 89 कुं4ा 220/110 केरल 200 7दसDब र-09 90 गजवेल िuतीय (cid:26)ांसिमशन 220/132 आं” .दशे 100 नवDब र-09 91 पु(cid:18)ल ीव(cid:19)दलु ा 220/132 आं” .दशे 100 7दसDब र-09 92 नारारौपेट 220/132 आं” .दशे 100 7दसDब र-09 93 ने(cid:18)ल ौर (मनुबोइन) 220/132 आं” .दशे 100 7दसDब र-09 94 नया टाउन कक-III 220/132 पिZम बंगाल 320 जुलाई -09 (2x160) 95 नया टाउन कक-III 220/33 पिZम बंगाल 100 जुलाई -09 (2x50) 96 शुभाSाम 220/132 पिZम बंगाल 160 िसतंबर-09 97 आरामबाग (िव,त ार) 220/132 पिZम बंगाल 160 िसतंबर-09 98 िबहार शरीफ िव,त ार 220/132 िबहार 150 अ.ैल-09 99 बेगूसराय (2x100) 220/132 िबहार 200 नवDब र-09 100 पारादीप (िuतीय 220/132 उड़ीसा 100 िसतंबर-09 (cid:26)ांसफाम(र) 101 भदरक (िuतीय Traf) 220/132 उड़ीसा 100 िसतंबर-09 102 समागुरी (िव,त ार) 220/132 असम 50 िसतंबर-09 103 नामWप (िव,त ार) 220/132 असम 100 अ(cid:25)ट ूबर-09 (2x50) ककककुुुुलललल ((((रररराााा""""यय यय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे )))) 222222220000 11110000111199995555¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 565 ससससययंंययंं ::ुु::ुु तत तत उउउउ(cid:20)(cid:20)(cid:20)(cid:20)मममम////ििििननननजजजजीीीी (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे 1 पूना (2x160 एमवीए) 220/66 टोर(cid:19)ट पावर 160 मई-09 2 भतर (2x160 एमवीए) 220/66 टोर(cid:19)ट पावर 160 मई-09 3 वेद (डभोई) (2x160 220/66 टोर(cid:19)ट पावर 160 जून-09 एमवीए) जीआई 4 पूना (िuतीय (cid:26)ांसिमशन) 220/66 टोर(cid:19)ट पावर 160 जुलाई -09 5 भतर (िuतीय (cid:26)ांसिमशन) 220/66 टोर(cid:19)ट पावर 160 जुलाई -09 6 वेद (डभोई) (िuतीय 220/66 टोर(cid:19)ट पावर 160 अग,त -09 (cid:26)ांस.) जीआई 7 कोबा (3x160) 220/132 सीईसी िलिमटेड 480 नवDब र-09 ककककुुुुलललल ((((ससससययंंययंं ::ुु::ुु तत तत उउउउ(cid:20)(cid:20)(cid:20)(cid:20)मममम////ििििननननजजजजीीीी 1111444444440000 (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे )))) ककककुुुुलललल ((((अअअअििििखखखखलललल भभभभााााररररतततत)))) 444400000000 9999333322220000 ककककुुुुलललल ((((अअअअििििखखखखलललल भभभभााााररररतततत)))) 222222220000 11111111999999995555566 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] अअअअननननबबुुबबुु धधंंधधंं ----6666....4444 2222000011110000----11111111 के दौरान बढ़ाई गई पारेषण .णाली 2222000011110000----11111111 ककककेेेे ददददौौौौरररराााानननन (cid:12)(cid:12)(cid:12)(cid:12)थथ थथ ााााििििपपपपतततत कककक.... गगगगईईईई पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन (cid:27)(cid:27) (cid:27)(cid:27) >>>>.... पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन ककककाााा ननननाााामममम ससससYYYYककककटटटट कककक.... VVVV>>>>ययययाााा5555वव वव ययययनननन ललललााााइइइइ पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा सससस..ंं..ंं ससससaaंंaaंं यय यय ाााा एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी नननन कककक.... ममममााााहहहह ललललबबंंबबंं ाााा ईईईई IIII.... 444400000000 ककककेेेेववववीीीी ललललााााइइइइनननन (cid:27)(cid:27) (cid:27)(cid:27) 444400000000 ककककेेेेववववीीीी ललललााााइइइइनननन ((((ससससीीीीएएएएसससस)))) 1 बाड-बिलया ((cid:25)व ैद) डी/सी पावरिSड 488 जून-10 2 बहादरु गढ़-सोनीपत लाइन (तृतीय ि,थित) डी/सी पावरिSड 104 जुलाई -10 3 रायगढ़ - रायपुर डी/सी पावरिSड 440 िसतंबर-10 4 मैथन आरबी - मैथन (पीजी) डी/सी पावरिSड 62 िसतंबर-10 5 कानपुर - ब(cid:18)ल भगढ़ डी/सी पावरिSड 743 अ(cid:25)ट ूबर-10 6 गोरखपुर - लखनऊ डी/सी पावरिSड 528 अ(cid:25)ट ूबर-10 7 मेरठ –कैथल ((cid:25)य )ू (उचआईएल) डी/सी पावरिSड 327 अ(cid:25)ट ूबर-10 8 िबरGसहपुर (एमपीजेनको) – दमोह डी/सी पावरिSड 457 अ(cid:25)ट ूबर-10 9 रांची-राउरकेला डी/सी पावरिSड 290 नवDब र-10 10 पीराना-दहे गाम डी/सी पावरिSड 94 7दसDब र-10 11 अंदल म(cid:19) दगु ा(पुर-जमशेदपुर पाट( लाइन के डी/सी पावरिSड 38 जनवरी-11 िलए एलआईएलओ (दगु ा(पुर एसटीएसपी म(cid:19) आरंिभे िव!तु को सुकर बनाने के िलए) 12 पालC (एमएसईटीसीएल) – पालC (पीजी) डी/सी पावरिSड 10 फरवरी-11 13 कोटेiव र-(cid:10)टहरी पूGलग *व ाइंट डी/सी पावरिSड 5 माच(-11 14 चमेरा पूGलग ,ट ेशन - चमरा-II एचईपी एस/सी पावरिSड 1 माच(-11 (भाग-I) 15 अ(cid:4)द (cid:18)ु ल ापुर-सोनीपत डी/सी पावरिSड 291 माच(-11 16 भ4ावती (पीजी)-पालC(पीजी) डी/सी पावरिSड 768 माच(-11 17 सुजालपुर म(cid:19) बीना-नागदा एलआईएलओ डी/सी पावरिSड 44 माच(-11 18 दगु ा(पुर एसटीपीएस म(cid:19) दगु ा(पुर-जमशेदपुर डी/सी डीवीसी 7 जनवरी-11 (पीजी) एलआईएलओ 19 रघुनाथपुर म(cid:19) मैथन-राचं ी (पीजी) डी/सी डीवीसी 21 माच(-11 एलआईएलओ¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 567 वष( के दरै ान पूरी कV गई कुल सीकेएम 444400000000 केवी लाइन(cid:19) ((((सीएस) 4444777711118888 444400000000 ककककेेेेववववीीीी ललललााााइइइइनननन (cid:27)(cid:27) (cid:27)(cid:27)((((ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट ट ट ेेशशेेशशनननन)))) 1 मलकारम् म(cid:19) रामगुंडम-घानापुर डी/सी एपी (cid:26)ां,क ो 52 अ.ैल-10 एलआईएलओ 2 कोथागुडम टीपी – mD म ाम डी/सी एपी (cid:26)ां,क ो 136 माच(-11 3 भुसावल -II – मौजुदा खडका डी/सी एमएसईटीसीए 15 अ.ैल-10 ल 4 िहसार – 7करोड़ी डी/सी एचवीपीएनएल 13 िसतंबर-10 5 िहसार – फतेहाबाद डी/सी एचवीपीएनएल 90 िसतंबर-10 6 झझर - दौलतापुर (.थम स6कट) डी/सी एचवीपीएनएल 68 जनवरी-11 7 झझर - दौलतापुर (िuतीय स6कट.) डी/सी एचवीपीएनएल 68 फरवरी-11 8 छाबडा-Gहदअु न एस/सी+ आरआरवीपीएन 342 अ.ैल-10 एल डी/सी 9 राजवेत- जोधपुर डी/सी आरआरवीपीएन 417 मई-10 एल 10 राजवेत-बारमर (.थम स6कट) एस/सी आरआरवीपीएन 15 मई-10 एल 11 डहरा (कोटा)-भीलवाड़ा एस/सी+ आरआरवीपीएन 187 अ(cid:25)ट ूबर-10 एल डी/सी 12 जैसलमेर- बारमर एस/सी आरआरवीपीएन 143 नवDब र-10 एल 13 जोधपुर - मेरटा (िuतीय स6कट) एस/सी आरआरवीपीएन 97 जनवरी-11 एल 14 केटीपीएस-कोटा(पीजी) (220 केवी पर डी/सी आरआरवीपीएन 13 माच(-11 एल .भा(cid:10)रत 7कए जाने के िलए) 15 राजवेत- बारमर (िuतीय स6कट) एस/सी आरआरवीपीएन 15 माच(-11 एल 16 मुंडका म(cid:19) बमनौली-बवाना एलआईएलओ डी/सी डीटीएल 1 फरवरी-11 17 डभोल-नेगोथने स6कट.-II एस/सी एमएसईटीसीए 137 जून-10 ल 18 वरसाना-हदाला डी/सी जीईटीसीओ 318 नवDब र-10 19 मुं4ा (अदानी) -वरसाना डी/सी जीईटीसीओ 168 फरवरी-11 20 सगर7दघी म(cid:19) फर(cid:25)क ा-सुभाSाम एस/सी डी/सी ड(cid:4)(cid:18) य ूटीसीएल 13 नवDब र-10 एलआईएलओ 21 Gलबडी (छोिनया) (जीईटीसीओ)- डी/सी जीईटीसीओ 206 माच(-11 रामचं4पुरा (वदावी) (जीईटीसीओ) वष( के दौरान पूरी कV गई कुल सीकेएम 444400000000 केवी लाइन ((((सब-,ट ेशन) 2222555511114444568 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 444400000000 ककककेेेेववववीीीी ललललााााइइइइनननन (cid:27)(cid:27) (cid:27)(cid:27)((((पपपपीीीीएएएएसससस)))) 1 सुजेन - झानोर डी/सी टोर(cid:19)ट पावर 160 जुलाई -10 2 जयगढ़ - नया कोयना (स6कट 1) एस/सी जेड(cid:4)(cid:18) य ू एनजC 55 जुलाई -10 3 Jaigad - नया कोयना (स6कट 2) एस/सी जेड(cid:4)(cid:18) य ू एनजC 55 अग,त -10 4 झझर - मुंडका (.थम स6कट ) एस/सी एपीसीपीएल 62 िसतंबर-10 5 झझर - मुंडका (िuतीय स6कट ) एस/सी एपीसीपीएल 70 नवDब र-10 6 सोलापुर (पावरिSड) म(cid:19) सोलापुर-कराड डी/सी (cid:10)रलायंस पावर 230 जनवरी-11 एलआईएलओ 7 झानौर-िपराना वाया िपराना टीपीएल डी/सी पर टोर(cid:19)ट पावर 284 फरवरी-11 एम/सी 8 ,ट रलाइट टीपीपी म(cid:19) राउरकेला- रायगढ़ डी/सी ,ट रलाइटटीपी 54 फरवरी-11 पी एलआईएलओ वष( के दौरान पूरी कV गई कुल सीकेएम 444400000000 केवी लाइन 999977770000 ((((सब-,ट ेशन) कुल सीकेएम 444400000000 केवी लाइन(cid:19) ((((अिखल भारत)))) 8888222200002222 >>>>.... सससस..ंं..ंं पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन ककककाााा ननननाााामममम ससससYYYYककककटटटट कककक.... VVVV>>>>ययययाााा5555वव वव ययययनननन ललललााााइइइइनननन पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा ससससaaंंaaंं यय यय ाााा एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी कककक.... ममममााााहहहह ललललबबंंबबंं ााााईईईई IIIIIIII.... 222222220000 केवी लाइन(cid:19) 222222220000 केवी लाइन ((((सीएस)))) 1 वापी -खडोली (यूटी छीएनएच) डी/सी पावरिSड 62 िसतंबर-10 2 क(cid:18)य ानेiव री – िपथाकारी डी/सी डीवीसी 16 जुलाई -10 3 धनबाद म(cid:19) क(cid:18)य ानेiव री –चं4पुरा 2xडी/सी डीवीसी 8 माच(-11 टीपी एलआईएलओ 4 क(cid:18)य ानेiव री-स6कट I म(cid:19) चं4पुरा डी/सी डीवीसी 90 माच(-11 टीपीएस-एमटीपीएस दोन^ स6कट^ का लूप 5 क(cid:18)य ानेiव री-स6कट ।। म(cid:19) चं4पुरा डी/सी डीवीसी 92 माच(-11 टीपीएस-एमटीपीएस दोन^ स6कट^ का लूप वष( के दौरान पूरी कV गई कुल सीकेएम 220 केवी लाइन ((((सब-,ट ेशन) 222200006666 222222220000 केवी लाइन(cid:19) ((((सब-,ट ेशन) 1 छीका-दरु ाला डी/सी एचवीपीएनएल 100 मई-10 2 बतरा-कौल डी/सी एचवीपीएनएल 90 अ(cid:25)ट ूबर-10 3 पेहोबा-कौल लाइन डी/सी एचवीपीएनएल 33 अ(cid:25)ट ूबर-10¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 569 4 बतारा म(cid:19) पीटीपीएस –सैफVदोन डी/सी एचवीपीएनएल 27 अ(cid:25)ट ूबर-10 लाइन का एलआईएलओ 5 वाइटीपीपी (डीसीआरटीपीपी) – डी/सी एचवीपीएनएल 104 नवDब र-10 नीलोखेरी 6 सोनीपत (जजी)-माहाना सब-,ट ेशन डी/सी एचवीपीएनएल 6 नवDब र-10 7 पीटीपीपी-बतरा लाइन डी/सी एचवीपीएनएल 28 नवDब र-10 8 सेमपला-मोहान लाइन डी/सी एचवीपीएनएल 69 फरवरी-11 9 मोहान-मलखा लाइन डी/सी एचवीपीएनएल 55 फरवरी-11 10 नालागढ़-मोहाली -I (वा,त िवक के डी/सी पीटीसीएल 111 मई-10 अनुसार लाइन कV लंबाई ठीक कV गई) 11 माना - एचपीसीएल िम&त ल एनजC डी/सी पीटीसीएल 97 मई-10 िलिमटेड (जमा काय)( 12 जीएचटीपी-िहDम तपुरा डी/सी डी/सी पीटीसीएल 81 जुलाई -10 13 खरार म(cid:19) जीजीएसएसटीपी – डी/सी पीटीसीएल 6 जुलाई -10 मोहाली-। के .थम स6कट का एलआईएलओ 14 तरन तारन म(cid:19) वरपाल-प(cid:18)ल ी के डी/सी पीटीसीएल 13 जुलाई -10 .थम स6कट का एलआईएलओ 15 मोहाली-राजपुरा डी/सी पीटीसीएल 13 अ(cid:25)ट ूबर-10 16 पखोवल म(cid:19) मलेरकोKा-लालटन कला ं डी/सी पीटीसीएल 2 अ(cid:25)ट ूबर-10 एस/सी एलआईएलओ 17 सा7दक म(cid:19) मोगा-मु(cid:25)त सर के .थम डी/सी पीटीसीएल 38 7दसDब र-10 स6कट का एलआईएलओ 18 मेलौत म(cid:19) भHटडा-मु(cid:25)त सर लाइन डी/सी पीटीसीएल 48 जनवरी-11 का एलआईएलओ 19 7फरोजपुर रोड लुिधयाना म(cid:19) डी/सी पीटीसीएल 10 माच(-11 लालटन कला-ं aRं ान एलआईएलओ 20 जीएसएस बगW म(cid:19) ब,स ी-फुलेरा डी/सी आरआरवीपीएनएल 9 मई-10 एलआईएलओ 21 कोटा (पीजी) कोटा-भीलवाडा डी/सी आरआरवीपीएनएल 4 जून-10 एलआईएलओ 22 Gहदअु न (400 केवी)-मंडावर एस/सी आरआरवीपीएनएल 47 िसतंबर-10 23 अकाई (जैसलमेर) म(cid:19) अमरसागर- 2xडी/ आरआरवीपीएनएल 77 िसतंबर-10 बारमर के दोन^ स6कट^ का सी एलआईएलओ 24 जीएसएस नोखा म(cid:19) बीकानरे -नागौर एस/सी आरआरवीपीएनएल 6 िसतंबर-10 लाइन का एलआईएलओ570 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 25 िछरावा म(cid:19) िहसार- खेतरी डी/सी आरआरवीपीएनएल 38 नवDब र-10 एलआईएलओ 26 िभनमाल (पीजी) – स(cid:19)चोरे एस/सी आरआरवीपीएनएल 67 माच(-11 (आरवीपीएन) 27 बHरघर टीपीएस-फलोडी एस/सी आरआरवीपीएनएल 123 माच(-11 28 जगतपुरा म(cid:19) ब,स ी-हीरापुरा .थम डी/सी आरआरवीपीएनएल 18 माच(-11 स6कट का एलआईएलओ 29 धोरीमना-स(cid:19)चोर (जालौर) एस/सी आरआरवीपीएनएल 64 माच(-11 30 नीमराना-कोटपुतली डी/सी आरआरवीपीएनएल 88 माच(-11 32 Gपडवारा जीएस-मसै स ( ज.ेके. लqम ी एस/सी आरआरवीपीएनएल 20 माच(-11 सीम(cid:19)ट 33 जीएसएस सावा म(cid:19) िच&त ौड़गढ़- डी/सी आरआरवीपीएनएल 5 माच(-11 नीमबछेड़ा एलआईएलओ 34 जीएसएस एमआईए अ(cid:18) वर म(cid:19) डी/सी आरआरवीपीएनएल 5 माच(-11 बदरपुर-अ(cid:18)व र एलआईएलओ 35 बाली म(cid:19) कंकरोली-िसरोही डी/सी आरआरवीपीएनएल 3 माच(-11 एलआईएलओ 36 मेटोरे (मेरठ) (पीजी)-गजरौला एस/सी यूपीपीटीसीएल 87 जून-10 37 संभल म(cid:19) मरु ादाबाद-एनएपीपी डी/सी यूपीपीटीसीएल 3 जून-10 एलआईएलओ 38 मुजBफरनगर-शामली एस/सी यूपीपीटीसीएल 56 नवDब र-10 39 शमशाबाद म(cid:19) आगरा (400)- डी/सी यूपीपीटीसीएल 50 7दसDब र-10 7फरोजाबाद एलआईएलओ 40 रोजा-बदौन डी/सी यूपीपीटीसीएल 192 जनवरी-11 41 ननौता म(cid:19) शहारनपुर-शामली डी/सी यूपीपीटीसीएल 6 जनवरी-11 एलआईएलओ 42 ननौता-मुजBफरनगर एस/सी यूपीपीटीसीएल 65 माच(-11 43 एटा म(cid:19) मैनपुरी (पीजी)-हरदआु गंज डी/सी यूपीपीटीसीएल 20 माच(-11 लाइन का एलआईएलओ 44 (cid:10)रज वैली-नारायणा एस/सी डीटीएल 5 िसतंबर-10 45 डीआईएएल (2x2x6 7कमी.) म(cid:19) डी/सी डीटीएल 24 िसतंबर-10 मेहरौली-बमनौली एलआईएलओ 46 खंजावाला (2xडी/सी)(.थम स6कट) डी/सी डीटीएल 7 फरवरी-11 म(cid:19) बवाना-नरेला एलआईएलओ 47 महारानी बाग (पीजी)-मि,जद मोड़ डी/सी डीटीएल 19 माच(-11 भूिमगत¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 571 48 काशीपुर- बरहने ी डी/सी पीटीसीयूएल 54 जनवरी-11 49 बरहने ी-पंतनगर एस/सी पीटीसीयूएल 71 जनवरी-11 50 कांगू-रौरी (.थम स6कट ) एस/सी एचपीईबीएल 24 फरवरी-11 51 कांगू-रौरी (िuतीय स6कट) एस/सी एचपीईबीएल 24 माच(-11 52 रेW माजरा (पीजीसीआईएल)- डी/सी एचपीईबीएल 7 माच(-11 उपेरला नंगल (नालागढ़) 53 खोदरी-माजरी(िuतीय स6कट) डी/सी एचपीईबीएल 35 माच(-11 पर एस/सी 54 वरसाना- मोरबी डी/सी जीईटीसीओ 214 अ.ैल-10 55 बोतड़ म(cid:19) कसोर-वरतेज डी/सी जीईटीसीओ 39 जून-10 एलआईएलओ 56 लखानी म(cid:19) कंसारी-थराड डी/सी जीईटीसीओ 1 जून-10 एलआईएलओ 57 वीराDग म-सलेजदा डी/सी जीईटीसीओ 118 जुलाई -10 58 भाट म(cid:19) वीराDग म-सलेतदा एम/सी जीईटीसीओ 71 जुलाई -10 एलआईएलओ 59 तापर-वरसाना लाइन डी/सी जीईटीसीओ 8 नवDब र-10 60 कपड़वंज म(cid:19) वानकबोरी-रनासन डी/सी जीईटीसीओ 30 नवDब र-10 स6कट II एलआईएलओ 61 उतरन-कोसाDब ा लाइन -I डी/सी जीईटीसीओ 86 फरवरी-11 62 Pव ािलयर 400 केवी (पीजी) म(cid:19) डी/सी एमपीपीटीसीएल 17 अ.ैल-10 Pव ािलयर-मालनपुर एलआईएलओ 63 जबलपुर-नरGसहपुर डी/सी एमपीपीटीसीएल 153 अ.ैल-10 64 चेगांव-िनमरानी डी/सी एमपीपीटीसीएल 205 अ.ैल-10 65 ह िं डया म(cid:19) सतपुरा-इटारसी .थम डी/सी एमपीपीटीसीएल 170 अ.ैल-10 स6कट का एलआईएलओ 66 छेगांव नया सब-,ट ेशन म(cid:19) बरवाहा- डी/सी एमपीपीटीसीएल 4 अ.ैल-10 खंडवा एलआईएलओ 67 इंदौर ।। म (cid:19) इंदौर-उ2ज ैन डी/सी एमपीपीटीसीएल 2 अ.ैल-10 एलआईएलओ 68 महiे व र-िनमरानी डी/सी एमपीपीटीसीएल 54 मई-10 69 आ,थ ा-बछा( एस/सी एमपीपीटीसीएल 50 मई-10 70 Gछदवाड़ा-बैतूल डी/सी एमपीपीटीसीएल 266 जुलाई -10 71 कोटा म(cid:19) सतना-बनसागर डी/सी एमपीपीटीसीएल 8 िसतंबर-10 एलआईएलओ 72 छेगांव नया सब-,ट ेशन पर डी/सी एमपीपीटीसीएल 35 जनवरी-11 खंडवा-नेपानगरएलआईएलओ572 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 73 सुखा (पीजी) 2xडी/सी म(cid:19) 2xडी/ एमपीपीटीसीएल 332 फरवरी-11 अमरकंटक- िबरGसहपुर सी एलआईएलओ 74 सतना-छतरपुर डी/सी एमपीपीटीसीएल 156 फरवरी-11 पर एस/सी 75 िव7दशा म(cid:19) भोपाल-बीना .थम डी/सी एमपीपीटीसीएल 42 माच(-11 स6कट का एलआईएलओ 76 दवे ास-आ,थ ा डी/सी एमपीपीटीसीएल 144 माच(-11 77 मैसस( सरे म इं,ट ीŒूट म(cid:19) थेयूर- डी/सी एमएसईटीसीएल 1 जून-10 मगरपKा एलआईएलओ 78 वानी म(cid:19) चं4पुर-वरोना डी/सी एमएसईटीसीएल 46 जुलाई -10 एलआईएलओ 79 एकडगे ांव म(cid:19) कारद-िमराज डी/सी एमएसईटीसीएल 5 नवDब र-10 एलआईएलओ 80 राजगोली-हलकरनी सब-,ट ेशन डी/सी एमएसईटीसीएल 22 7दसDब र-10 पर एस/सी 81 Gहगोली म(cid:19) पौड-िगरवानी (स6कट- डी/सी एमएसईटीसीएल 44 फरवरी-11 1) का एलआईएलओ 82 हलकरनी म(cid:19) को(cid:18)ह ापुर-प^दा िuतीय डी/सी एमएसईटीसीएल 19 फरवरी-11 स6कट का एलआईएलओ 83 खेदामरा-बमतरा डी/सी सीपीटीसीएल 50 जून-10 84 दोमा म(cid:19) रायपुर(पीजी)- सुहले ा डी/सी सीपीटीसीएल 42 िसतंबर-10 (भाटापारा) एलआईएलओ 85 एनपीसीएल-बीपी एमडी-5 डी/सी सीपीटीसीएल 7 फरवरी-11 86 मोपका म(cid:19) कोरबा-िस(cid:18)त रा डी/सी सीपीटीसीएल 24 माच(-11 एलआईएलओ 87 ओगलापुर 400 केवी सब-,ट ेशन – डी/सी एपी (cid:26)ां,क ो 25 अ.ैल-10 नागारम 88 परचूर म(cid:19) तडीक^डा-kगोले डी/सी एपी (cid:26)ां,क ो 7 जून-10 एलआईएलओ 89 वे(cid:18)त ूर- वनापाथC डी/सी एपी (cid:26)ां,क ो 40 िसतंबर-10 90 RाšणकोXटूर म(cid:19) नानौर-वनापाथC डी/सी एपी (cid:26)ां,क ो 26 नवDब र-10 एलआईएलओ 91 िशवारामप(cid:18)ल ी म(cid:19) एचआईएएल- डी/सी एपी (cid:26)ां,क ो 1.5 नवDब र-10 गछीवाउली लादन का एलआईएलओ 92 RाšणकोXटूर – मलयाला डी/सी एपी (cid:26)ां,क ो 21 फरवरी-11 93 कलपका सब-,ट ेशन- मैसस( R(cid:19)िड(cid:25)स डी/सी एपी (cid:26)ां,क ो 22 माच(-11¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 573 (भाग लाइन ) 94 धोने-कDब लापडू डी/सी एपी (cid:26)ां,क ो 12 माच(-11 पर एस/सी 95 कृिषनगरी-संKीपली डी/सी एपी (cid:26)ां,क ो 11 माच(-11 पर एस/सी 96 कDब लापडू – ल(cid:25)क ाSाम डी/सी एपी (cid:26)ां,क ो 9 माच(-11 पर एस/सी 97 रेगुलापडू म(cid:19) गूटी-अलीपुरा स े डी/सी एपी (cid:26)ां,क ो 22 माच(-11 एलआईएलओ 98 नागरम एसड(cid:4)(cid:18) य ू ,ट ेशन पर डी/सी एपी (cid:26)ां,क ो 3 माच(-11 पुलाकुथC-राम*प ा एलआईएलओ 99 िछलाक(cid:18)ल ू म (cid:19) वीटी-नारकेटप(cid:18)ल ी डी/सी एपी (cid:26)ां,क ो 5 माच(-11 एलआईएलओ 100 गजवेल म(cid:19) मेदोहल-िमनपुर डी/सी एपी (cid:26)ां,क ो 80 माच(-11 एलआईएलओ 101 सिे लवग ू म (cid:19) पलु ाकुथC-रामा*प ा डी/सी एपी (cid:26)ां,क ो 0.7 िसतंबर-10 एलआईएलओ 102 ऐलीफ(cid:19)ट गेट-ट^िडयारपेट एस/सी टीएएन(cid:26)ां,क ो 5 जून-10 103 वल„ू थ ूर – परामाकुडी डी/सी पर एस/सी टीएएन(cid:26)ां,क ो 50 जून-10 एस/सी 104 गोबी-मै&त ूर टीपी डी/सी टीएएन(cid:26)ां,क ो 82 जून-10 पर एस/सी 105 एस.पी.कोली-थारामिण एस/सी टीएएन(cid:26)ां,क ो 49 अग,त -10 (पेराDब कम-थाराम िण भाग) 106 ओथाकलमंडपम-कॉमप *व ाइंट - एस/सी टीएएन(cid:26)ां,क ो 62 अग,त -10 पो3न ापुरम् 107 केआईटीएस पाक( सब-,ट ेशन पर एस/सी टीएएन(cid:26)ां,क ो 1 िसतंबर-10 एस.पी.कोली-थारामिण लाइन का एलआईएलओ 108 एनसीटीपीएस ,ट ेज II म(cid:19) डी/सी टीएएन(cid:26)ां,क ो 3 नवDब र-10 एनसीटीपीएस-मोर एलआईएलओ (आरंिभक पावर के िलए) 109 †ीपेरंबदरू आईपीसीओटी- डी/सी टीएएन(cid:26)ां,क ो 12 माच(-11 सुंगूवरछा9म् 400 केवी सब-,ट ेशन 110 ह,सन (शांितSाम) पर मैसूर – 2xडी/ केपीटीसीएल 28 7दसDब र-10 िशमोगा लाइन पर एलआईएलओ सी574 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 111 नर(cid:19)4 400 केवी सब-,ट ेशन डी/सी केपीटीसीएल 191 7दसDब र-10 घाट.भा 112 नर(cid:19)4 सब-,ट ेशन - एमके aगली सब- एस/सी केपीटीसीएल 34 7दसDब र-10 ,ट ेशन 113 ‘टागली- टीके हाली -वाजामंगला डी/सी केपीटीसीएल 3 7दसDब र-10 का एलआईएलओ 114 वरही-िशमोगा डी/सी केपीटीसीएल 9 7दसDब र-10 115 पी3न या-एनआरएस डी/सी केपीटीसीएल 8 7दसDब र-10 116 आनंद राव स6कल-िनमहा-एचएएल एस/सी केपीटीसीएल 17 7दसDब र-10 117 नर(cid:19)4-केआईडीएवी एम/सी केपीटीसीएल 4 7दसDब र-10 पर डी/सी लाइन 118 बि,तपुर-कुशलनगर डी/सी केपीटीसीएल 154 माच(-11 119 ए(cid:10)रयाकोड(पीजीसीआईएल) 400 एम/सी केईबी 1 माच(-11 केवी सब-,ट ेशन-ए(cid:10)रयाकोड सब- ,ट ेशन 120 रामाना थपुरम पर िवि(cid:18)लयानुर- डी/सी पुडुचुरी िव!ुत 29 अ(cid:25)ट ूबर-10 बहोर का एलआईएलओ िवभाग 121 3य ू टाउन एए- III पर जीरट-क,ब ा डी/सी ड(cid:4)(cid:18) य ूबीईटीसीएल 2 नवDब र-10 लाइन का एलआईएलओ 122 मुजBफरपुर(पीजी) पर हाजीपुर- डी/सी बीईबी 15 नवDब र-10 मुजBफरपुर(कांटी) का एलआईएलओ 123 बेगुसराय-मुजBफरपुर(कांटी) डी/सी बीईबी 304 नवDब र-10 (एमटीपीएस) लाइन 124 कुच-े बालासोर(स6कट- II) एस/सी ओपीटीसीएल 76 जनवरी-11 125 नरे34 पुर-म(cid:19)धासल(स6कट- II) एस/सी ओपीटीसीएल 170 जनवरी-11 126 िमसा-िबरनीहट डी/सी मेघालयईबी 226 अग,त -10 ववववषषषष (cid:3)(cid:3) (cid:3)(cid:3)ककककेेेे ददददौौौौरररराााानननन पपपपणणूूणणूू ""(cid:3)(cid:3)""(cid:3)(cid:3) पपपपणणेेणणेे (cid:23)(cid:23)(cid:23)(cid:23)थथ थथ ााााििििपपपपतततत 222222220000 ककककेेेेववववीीीी 6666555533339999 ललललााााइइइइनननन ((((ससससबबबब----(cid:23)(cid:23)(cid:23)(cid:23)टट ट ट ेेशशेेशशनननन)))) ककककाााा ककककुुुुलललल ससससीीीीककककेेेेएएएएमममम 222222220000 ककककेेेेववववीीीी ललललााााइइइइनननन कककक(cid:18)(cid:18)(cid:18)(cid:18)((((पपपपीीीीएएएएसससस )))) 1 ,ट रलाइट टीपीपी-,ट रलाइट डी/सी ,ट रलाइट 9 अग,त -10 कैि*टव *ल ांट डी/सी 2 एलेन दहु गं न-पनसा(-नालागढ़ डी/सी डी/सी एडी हाइEो 349 िसतंबर-10 222222220000 ककककेेेेववववीीीी ललललााााइइइइनननन ((((पपपपीीीीएएएएसससस )))) ककककाााा ककककुुुुलललल 333355558888 ससससीीीीककककेेेेएएएएमममम ववववषषषष (cid:3)(cid:3) (cid:3)(cid:3)ककककेेेे ददददौौौौरररराााानननन पपपपणणूूणणूू ""(cid:3)(cid:3)""(cid:3)(cid:3) पपपपणणेेणणेे (cid:23)(cid:23)(cid:23)(cid:23)थथ थथ ााााििििपपपपतततत 222222220000 ककककेेेेववववीीीी 7777111166665555 ललललााााइइइइनननन ((((अअअअििििखखखखलललल भभभभााााररररतततत)))) ककककाााा ककककुुुुलललल ससससीीीीककककेेेेएएएएमममम¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 575 2222000011110000----11111111 ककककेेेे ददददौौौौरररराााानननन (cid:12)(cid:12)(cid:12)(cid:12)थथ थथ ााााििििपपपपतततत ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट टट ेेेेशशशशनननन >>>>.... सससस..ंं..ंं ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट ट ट ेेशशेेशशनननन ववववोोोो4444टट ट ट ेेजजेेजज VVVV>>>>ययययाााा5555वव वव ययययनननन (cid:7)(cid:7)(cid:7)(cid:7)ममममतततताााा पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेे अअअअननननपपुुपपुु ाााातततत एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ((((एएएएमममम डडडड(cid:2)(cid:2)(cid:2)(cid:2)44 44 यय यय ूू ूू ककककाााा ममममााााहहहह ((((ककककेेेेववववीीीी////ककककेेेेववववीीीी)))) //// एएएएममममववववीीीीएएएए)))) 444400000000 ककककेेेेववववीीीी ((((ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट ट ट ेेशशेेशशनननन)))) ((((ससससीीीीएएएएसससस)))) 1 सोनीपत(.थम (cid:26)ां,फ ) 400/220 पावरिSड 315 िसतंबर-10 2 महारानीबाग जीआईएस 400/220 पावरिSड 500 िसतंबर-10 ए(cid:25)स ट(cid:19)शन(.थम (cid:26)ां,फ ) 3 पुणे 400/220 पावरिSड 630 अ(cid:25)ट ूबर-10 4 बीना 400/220 पावरिSड 315 अ(cid:25)ट ूबर-10 5 सोनीपत (िuतीय (cid:26)ां,फ ) 400/220 पावरिSड 315 नवDब र-10 6 महारानीबाग जीआईएस 400/220 पावरिSड 500 नवDब र-10 ए(cid:25)स ट(cid:19)शन(िuतीय) 7 िपराणा (.थम (cid:26)ां,फ ) 400/220 पावरिSड 315 फरवरी-11 8 मुवKापुझा सब-,ट ेशन (.थम 400/220 पावरिSड 315 फरवरी-11 (cid:26)ां,फ ) 9 वगूरा सब-,ट ेशन फोथ( आईसीटी 400/220 पावरिSड 315 माच(-11 ((((3333xxxx111100005555)))) 10 मालरकोटला ए(cid:25)स ट(cid:19)शन 400/220 पावरिSड 500 माच(-11 11 िपराणा(िuतीय (cid:26)ां,फ ) 400/220 पावरिSड 315 माच(-11 12 Pव ािलयर िव,त ार 400/220 पावरिSड 315 माच(-11 कुल पीजीसीआईएल 4444666655550000 डडडडीीीीववववीीीीससससीीीी 0 ककककुुुुलललल ((((कककक(cid:27)(cid:27)(cid:27)(cid:27)CCCCीीीीयययय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे )))) 4444666655550000 444400000000 ककककेेेेववववीीीी ((((ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट ट ट ेेशशेेशशनननन)))) ((((ससससबबबब---- (cid:12)(cid:12)(cid:12)(cid:12)टट ट ट ेेशशेेशशनननन)))) 1 7करोरी 400/220 एचवीपीएनएल 630 अ.ैल-10 2 7करोरी (तृतीय (cid:26)ांसिमशन) 400/220 एचवीपीएनएल 315 मई-10 3 दौलतापुर 400/220 एचवीपीएनएल 630 नवDब र-10 4 दौलतापुर (तृतीय (cid:26)ांसिमशन) 400/220 एचवीपीएनएल 315 7दसDब र10576 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 5 Gहडन सब-,ट ेशन ((((1111xxxx333311115555)))) 400/220 आरआरवीपीएनएल 315 िसतंबर-10 6 भीलवाड़ा सब-,ट ेशन ((((1111xxxx333311115555)))) 400/220 आरआरवीपीएनएल 315 नवDब र-10 7 बारमर सब-,ट ेशन ((((1111xxxx333311115555)))) 400/220 आरआरवीपीएनएल 315 नवDब र-10 8 अकाई (जैसलमेर) 400/220 आरआरवीपीएनएल 315 नवDब र-10 9 अकाई (जैसलमेर) (िuतीय 400/220 आरआरवीपीएनएल 315 7दसDब र-10 टीआरएफ) 10 मुंडका (.थम टीआरएफ) 400/220 डीटीएल 315 िसतंबर-10 11 मुंडका (िuतीय टीआरएफ) 400/220 डीटीएल 315 माच(-11 12 बवाना ((((2222xxxx333311115555)))) 400/220 डीटीएल 630 माच(-11 13 कटनी 400/220 एमपीपीटीसीएल 315 मई-10 14 इंदौर 400/220 एमपीपीटीसीएल 315 फरवरी-11 15 चकन (िuतीय आईसीटी) 400/220 एमएसईटीसीएल 315 जून-10 16 कलवा ((((3333xxxx111166667777)))) 400/220 एमएसईटीसीएल 500 जनवरी-11 17 वना (2x315 एमवीए) 400/220 जीईटीसीओ 315 नवDब र-10 18 कोबा 400/220 जीईटीसीओ 315 माच(-11 19 तालागु*प ा (तृतीय ) 400/220 केपीटीसीएल 315 7दसDब र10 20 महबूबनगर(िuतीय (cid:26)ांसिमशन) 400/220 एपी (cid:26)ां,क ो 315 मई-10 21 िच&त ूर (िuतीय (cid:26)ांसिमशन) 400/220 एपी (cid:26)ां,क ो 315 मई-10 22 मलकरम (.थम टीआरएफ) 400/220 एपी (cid:26)ां,क ो 315 जून-10 23 मलकरम (िuतीय टीआरएफ) 400/220 एपी (cid:26)ां,क ो 315 अग,त -10 24 महबूबनगर (तृतीय (cid:26)ांसिमशन) 400/220 एपी (cid:26)ां,क ो 315 अग,त -10 ककककुुुुलललल ((((रररराााा""""यय यय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे )))) 8888666699990000 444400000000 ककककेेेेववववीीीी ((((ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट ट ट ेेशशेेशशनननन)))) ((((पपपपीीीीएएएएसससस)))) 1 िपराना(2x315 एमवीए) 400/132 टोर(cid:19)ट पावर Ltd 630 माच(-11 ककककुुुुलललल ((((ििििननननजजजजीीीी (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे )))) 666633330000 ककककुुुुलललल((((अअअअििििखखखखलललल भभभभााााररररतततत )))) 444400000000 ककककेेेेववववीीीी 11113333999977770000 ((((ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट टट ेेेेशशशशनननन))))¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 577 >>>>.... ववववोोोो4444टट टट ेेजजेेजज सससस..ंं..ंं अअअअननननपपुुपपुु ाााातततत ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट ट ट ेेशशेेशशनननन VVVV>>>>ययययाााा5555वव वव ययययनननन (cid:7)(cid:7)(cid:7)(cid:7)ममममतततताााा पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ((((एएएएममममडडडड(cid:2)(cid:2)(cid:2)(cid:2)44 44 यय यय ूू ूू //// ममममााााहहहह ((((ककककेेेेववववीीीी////ककककेेेेववववीीीी)))) एएएएममममववववीीीीएएएए)))) 222222220000ककककेेेेववववीीीी ((((ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट ट ट ेेशशेेशशनननन)))) ((((CCCC)))) 1 िपथौरागढ़(.थम ) 220/132 पावरिSड 100 अग,त -10 2 िपथौरागढ़ (िuतीय) 220/132 पावरिSड 100 नवDब र-10 3 बा(cid:10)रपाडा 220/132 पावरिSड 160 माच(-11 4 बरजोरा सब-,ट ेशन 220/132 डीवीसी 300 जून-10 (2x150) ककककुुुुलललल ((((कककक(cid:27)(cid:27)(cid:27)(cid:27)CCCCीीीीयययय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे )))) 666666660000 222222220000ककककेेेेववववीीीी ((((ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट ट ट ेेशशेेशशनननन)))) ((((ससससबबबब---- (cid:12)(cid:12)(cid:12)(cid:12)टट ट ट ेेशशेेशशनननन)))) 1 7करोरी (.थम (cid:26)ांसिमशन) 220/132 एचवीपीएनएल 100 मई-10 2 ब9ा 220/132 एचवीपीएनएल 200 िसतंबर-10 3 7करोरी(िuतीय (cid:26)ांसिमशन) 220/132 एचवीपीएनएल 100 िसतंबर-10 4 रेवाड़ी (िव,त ार) (100-50) 220/132 एचवीपीएनएल 50 अ(cid:25)ट ूबर-10 5 Gजद (िव,त ार) 220/132 एचवीपीएनएल 100 नवDब र-10 6 ,म लखा (2x100) 220/132 एचवीपीएनएल 200 फरवरी-11 7 संपला 220/132 एचवीपीएनएल 200 माच(-11 8 बागW 220/132 आरआरवीपीएनएल 100 मई-10 9 बोरांडाआई/ए 220/132 आरआरवीपीएनएल 100 जून-10 10 नोखा 220/132 आरआरवीपीएनएल 100 नवDब र-10 11 िचरावा(1x100) 220/132 आरआरवीपीएनएल 100 नवDब र-10 12 जयपुर (इं7दरा गांधी नगर) 220/132 आरआरवीपीएनएल 100 7दसDब र-10 जीएसएस (1x100) 13 एमआईए (अप-Sेड) 220/132 आरआरवीपीएनएल 100 माच(-11 14 सावा (अपSेड) 220/132 आरआरवीपीएनएल 100 माच(-11 15 धोलपुर(100-50) 220/132 आरआरवीपीएनएल 50 माच(-11 16 Hरगुस (िसकर) (100-50) 220/132 आरआरवीपीएनएल 50 माच(-11 17 फलोदी (जोधपुर) (100-50) 220/132 आरआरवीपीएनएल 50 माच(-11 18 धोरीमाना (बारमर) 220/132 आरआरवीपीएनएल 100 माच(-11 (िव,त ार)578 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 19 मंडावर (दौसा) (िव,त ार) 220/132 आरआरवीपीएनएल 100 माच(-11 20 भीलवाड़ा(िव,त ार) 220/132 आरआरवीपीएनएल 100 माच(-11 21 बंसवारा (िव,त ार) 220/132 आरआरवीपीएनएल 100 माच(-11 22 भरतपुर(िव,त ार) 220/132 आरआरवीपीएनएल 100 माच(-11 23 मोदक (कोटा) (100-50) 220/132 आरआरवीपीएनएल 50 माच(-11 24 बलोतरा (बारमर) (100- 220/132 आरआरवीपीएनएल 50 माच(-11 50) 25 फुलेरा (जयपुर) (100-50) 220/132 आरआरवीपीएनएल 50 माच(-11 26 7कशनगढ़ (अजमेर) 220/132 आरआरवीपीएनएल 100 माच(-11 (िव,त ार) 27 Gहडन (करौली) (िव,त ार) 220/132 आरआरवीपीएनएल 50 माच(-11 28 गुलाबपुर (भीलवाड़ा) 220/132 आरआरवीपीएनएल 100 माच(-11 (िव,त ार) 29 कं)ोली (राजसमंद) 220/132 आरआरवीपीएनएल 100 माच(-11 (िव,त ार) 30 अमरसागर (जैसलमेर) 220/132 आरआरवीपीएनएल 100 माच(-11 (िव,त ार) 31 कुकस (जयपुर) (िव,त ार) 220/132 आरआरवीपीएनएल 100 माच(-11 32 िचरावा (झुंझणु)(िव,त ार) 220/132 आरआरवीपीएनएल 100 माच(-11 33 धोड (िसकर)(िव,त ार) 220/132 आरआरवीपीएनएल 100 माच(-11 34 संभल, मुरादाबाद 220/132 यूपीपीटीसीएल 200 जून-10 35 गजरौला 220/132 यूपीपीटीसीएल 200 जून-10 36 दादरी 220/132 यूपीपीटीसीएल 200 नवDब र-10 37 एटा 220/132 यूपीपीटीसीएल 100 7दसDब र-10 38 ननौटा (160+100) 220/132 यूपीपीटीसीएल 160 जनवरी-11 39 नौब,त ा(160-100) 220/132 यूपीपीटीसीएल 60 माच(-11 40 सा‘पुरी(160-100) 220/132 यूपीपीटीसीएल 60 माच(-11 41 बदौन(160-100) 220/132 यूपीपीटीसीएल 60 माच(-11 42 शता(cid:4)द ीनगर(160-100) 220/132 यूपीपीटीसीएल 60 माच(-11 43 पनकV(160-100) 220/132 यूपीपीटीसीएल 60 माच(-11 44 जहLगीराबाद(160-100) 220/132 यूपीपीटीसीएल 60 माच(-11 45 आजमगढ़(160-100) 220/132 यूपीपीटीसीएल 60 माच(-11 46 अतरौली(160-100) 220/132 यूपीपीटीसीएल 60 माच(-11¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 579 47 दइे Wआ (100) 220/132 यूपीपीटीसीएल 100 माच(-11 48 सा‘पुरी(160-100) 220/132 यूपीपीटीसीएल 60 माच(-11 49 लोनी(150-100) 220/132 यूपीपीटीसीएल 50 माच(-11 50 हरदोई रोड, लखनऊ(160- 220/132 यूपीपीटीसीएल 60 माच(-11 100) 51 खुजा( (160-100) 220/132 यूपीपीटीसीएल 60 माच(-11 52 ग^डा(160-100) 220/132 यूपीपीटीसीएल 60 माच(-11 53 िसकंदरा, आगरा (60) 220/33 यूपीपीटीसीएल 60 माच(-11 54 बदौन (150-100) 220/132 यूपीपीटीसीएल 50 माच(-11 55 शमशाबाद रोड, आगरा 220/132 यूपीपीटीसीएल 320 माच(-11 56 गोरखपुर II 220/132 यूपीपीटीसीएल 160 माच(-11 57 प^ग (िव,त ार) (40-20 ) 220/66 एचपीईबीएल 20 माच(-11 58 ज,स ूर सब-,ट ेशन 1x25 220/33 एचपीईबीएल 25 माच(-11 एमवीए 59 उपरला नांगल (नालागढ़) 220/66 एचपीईबीएल 200 माच(-11 60 अमलो रोड मंडी गोGवद गढ़ 220/66 पीटीसीएल 100 जून-10 61 िहDम तपुर 220/66 पीटीसीएल 100 जुलाई -10 62 वेरपाल सुदढ़ृ ीकरण(100- 220/66 पीटीसीएल 50 जुलाई -10 50) 63 सा7दक (यू/जी) (1x100 220/66 पीटीसीएल 100 अग,त -10 एमवीए) 64 खारर 220/66 पीटीसीएल 100 अग,त -10 65 तारन तारन 220/66 पीटीसीएल 100 अग,त -10 66 िसिवल लाइंस एएसआर 220/66 पीटीसीएल 100 अग,त -10 67 सुनाम 220/66 पीटीसीएल 100 अग,त -10 68 पखोवल (3य ू) (1x100 220/66 पीटीसीएल 100 नवDब र-10 एमवीए) 69 एफ पी नाभा (1x100) 220/66 पीटीसीएल 100 7दसDब र-10 70 साहनीवाल (तृतीय 220/66 पीटीसीएल 100 7दसDब र-10 (cid:26)ांसफाम(र) 71 कोहारा (Aug) (1x100 220/66 पीटीसीएल 100 जनवरी-11 एमवीए) 72 अलगन 220/66 पीटीसीएल 100 माच(-11 73 झुनीर 220/66 पीटीसीएल 100 माच(-11580 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] घुबाया (अित(cid:4)र(cid:6) त) 220/66 पीटीसीएल 100 माच(cid:11)-11 74 बाजा खाना (अित(cid:4)र(cid:6) त) 220/66 पीटीसीएल 100 माच(cid:11)-11 75 मालरकोटला (अित(cid:4)र(cid:6) त) 220/66 पीटीसीएल 100 माच(cid:11)-11 76 मलोत((cid:12) यू) 220/66 पीटीसीएल 100 माच(cid:11)-11 77 करतारपुर 220/132 पीटीसीएल 100 माच(cid:11)-11 78 बो(cid:4)टयांवाला 220/66 पीटीसीएल 100 माच(cid:11)-11 79 (cid:4)रज वैली 220/66 डीटीएल 320 िसतंबर-10 80 डायल 220/66 डीटीएल 320 िसतंबर-10 81 वसंत कुंज (तृतीय) 220/66 डीटीएल 160 नव(cid:25)ब र-10 82 शालीमार बाग (तृतीय) 220/33 डीटीएल 100 माच(cid:11)-11 83 मि(cid:26)जद-मोठ (िसरीफोट(cid:11)) 220/33 डीटीएल 200 माच(cid:11)-11 84 मुंडका( (cid:30)थम ांसफाम(cid:11)र) 220/66 डीटीएल 160 माच(cid:11)-11 85 लखानी(आगाथाला)((cid:30)थम 220/66 जीईटीसीओ 100 अ(cid:30)ैल-10 86 ांसफाम(cid:11)र) बोटड 220/66 जीईटीसीओ 50 अ(cid:30)ैल-10 87 भाट(बावला) 220/66 जीईटीसीओ 100 मई-10 88 लखानी(आगाथाला) 220/66 जीईटीसीओ 100 नव(cid:25)ब र-10 89 (ि!तीय ांसफाम(cid:11)र) कांगािसय$ ली 220/66 जीईटीसीओ 100 माच(cid:11)-11 90 भाट(बावला) (ि!तीय ांसफाम(cid:11)र) 220/66 जीईटीसीओ 100 माच(cid:11)-11 91 बोटड(ि!तीय ांसफाम(cid:11)र) 220/66 जीईटीसीओ 150 माच(cid:11)-11 92 जंबुवा (िव(cid:26) तार) 220/132 जीईटीसीओ 50 माच(cid:11)-11 93 छ&ाल(िव(cid:26) तार) 220/66 जीईटीसीओ 50 माच(cid:11)-11 94 कपडवंज(िव(cid:26) तार) 220/66 जीईटीसीओ 50 माच(cid:11)-11 95 अंजर (िव(cid:26) तार) 220/66 जीईटीसीओ 100 माच(cid:11)-11 96 मेहसाना (िव(cid:26) तार) 220/66 जीईटीसीओ 50 माच(cid:11)-11 97 डोमा 220/132 सीपीटीसीएल 160 िसतंबर-10 98 मेन (cid:26) टेप डाउन जीआईएस सब- 220/132 सीपीटीसीएल 320 माच(cid:11)-11 99 (cid:26) टेशन (एमएसडीएस)-5 पारसवािण (महासमुंद) (अित(cid:4)र(cid:6) त) 220/132 सीपीटीसीएल 160 माच(cid:11)-11 100 मोपका (अित(cid:4)र(cid:6) त) 220/132 सीपीटीसीएल 160 माच(cid:11)-11 101 छतरपुर 220/132 एमपीपीटीसीएल 160 अ(cid:30)ैल-10 102 छेगांव 220/132 एमपीपीटीसीएल 160 अग(cid:26)त -10 103¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 581 104 आ(cid:2) था 220/132 एमपीपीटीसीएल 100 िसतंबर-10 105 कोटार 220/132 एमपीपीटीसीएल 160 नव(cid:6) बर-10 106 बेतुल 220/132 एमपीपीटीसीएल 160 नव(cid:6) बर-10 107 िव(cid:11)दशा 220/132 एमपीपीटीसीएल 160 जनवरी-11 108 वािण(2x50) 220/33 एमएसईटीसीएल 100 जुलाई -10 109 चकन 220/22 एमएसईटीसीएल 50 अग(cid:2) त-10 110 श(cid:17)(cid:18)ा 220/33 एमएसईटीसीएल 100 (cid:11)दस(cid:6) बर-10 111 टेमघर 220/22 एमएसईटीसीएल 50 (cid:11)दस(cid:6) बर-10 112 (cid:20)हगोली 220/132 एमएसईटीसीएल 100 माच(cid:27)-11 113 (cid:20)हगोली(2x25) 220/33 एमएसईटीसीएल 50 माच(cid:27)-11 114 चकन (2x50) 220/22 एमएसईटीसीएल 100 माच(cid:27)-11 115 तालेगांव(2x50) 220/33 एमएसईटीसीएल 100 माच(cid:27)-11 116 काडेगांव (वािण) 220/132 एमएसईटीसीएल 100 माच(cid:27)-11 117 (cid:28)चुर 220/132 एपी !ां(cid:2) को 100 जून-10 118 सािलवागु 220/11 एपी !ां(cid:2) को 100 िसतंबर-10 119 $ा%णाकोटकुर (2x25) 220/11 एपी !ां(cid:2) को 25 जनवरी-11 120 मलयाला (4x31.5) 220/11 एपी !ां(cid:2) को 31.5 फरवरी-11 121 $ांिड) स (2x100) 220/132 एपी !ां(cid:2) को 200 माच(cid:27)-11 122 रेगुलापाद ु 220/11 एपी !ां(cid:2) को 25 माच(cid:27)-11 123 थुिडयालुर (अित*र) त 230/110 टीएएन!ां(cid:2) को 80 जून-10 !ांसिमशन) 124 केआईटीएस पाक(cid:27) 230/110 टीएएन!ां(cid:2) को 80 िसतंबर-10 125 बसीन ि$ज(अित*र)त 230/110 टीएएन!ां(cid:2) को 100 िसतंबर-10 !ांसिमशन) 126 अमुथापुरम (अित*र)त 230/33 टीएएन!ां(cid:2) को 50 जनवरी-11 !ांसफाम(cid:27)र) 127 कोिडकु/िच(अित*र)त 230/110 टीएएन!ां(cid:2) को 100 जनवरी-11 !ांसफाम(cid:27)र) 128 होसुर(अित*र)त !ांसफाम(cid:27)र) 230/110 टीएएन!ां(cid:2) को 100 जनवरी-11 129 अलागरकोइल(अित*र) त.!ांसफा 230/110 टीएएन!ां(cid:2) को 100 माच(cid:27)-11 म(cid:27)र) 130 कुं(cid:18)ा (ि0तीय !ांसिमशन) 220/110 केईबी 200 नव(cid:6) बर-10 131 पोठेनकोड(तृतीय 220/110 केईबी 200 माच(-11582 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] (cid:26)ांसफाम(र) 132 एम के aबली 220/110 केपीटीसीएल 100 7दसDब र-10 133 घाट.भा (.थम (cid:26)ांसफाम(र) 220/110 केपीटीसीएल 100 7दसDब र-10 134 ए’ ,ट ेशन कंपाउंड (आनंद 220/66 केपीटीसीएल 150 7दसDब र-10 राव स6कल) 135 रामानगर (को(cid:10)ठपुरा) 220/66 केपीटीसीएल 100 7दसDब र-10 136 िनमहसं 220/66 केपीटीसीएल 300 7दसDब र-10 137 वाजामंगला 220/66 केपीटीसीएल 150 7दसDब र-10 138 ई,ट िडवीजन कंपाउंड 220/66 केपीटीसीएल 300 7दसDब र-10 139 घाट.भा (िuतीय (cid:26)ांसिमशन) 220/110 केपीटीसीएल 100 माच(-11 140 कुशलनगर 220/66 केपीटीसीएल 100 माच(-11 141 बोलांिगर(2x100) 220/132 ओपीटीसीएल 100 अग,त -10 142 बोलांिगर(िuतीय (cid:26)ांसफाम(र) 220/132 ओपीटीसीएल 100 माच(-11 143 सुभाषSाम 220/132 ड23 यूबीईटीसीएल 160 अग,त -10 144 Gसगूर(2x160) 220/132 ड23 यूबीईटीसीएल 160 िसतंबर-10 145 सुभाषSाम(िuतीय) 220/132 ड23 यूबीईटीसीएल 160 नवDब र-10 146 Gसगूर(2x160) 220/132 ड23 यूबीईटीसीएल 160 नवDब र-10 147 कोलकाता लेदर कॉD* ल े(cid:25)स 220/132 ड23 यूबीईटीसीएल 160 नवDब र-10 148 आसनसोल (सुदढ़ृ ीकरण ) 220/132 ड23 यूबीईटीसीएल 100 नवDब र-10 149 खगौल (पटना) (िव,त ार) 220/132 बीईबी 100 नवDब र-10 150 बोधगया(िव,त ार) 220/132 बीईबी 150 नवDब र-10 151 िबदानासी 220/33 ओपीटीसीएल 40 जनवरी-11 152 िबरनीहट(2x160) 220/132 मेघालयईबी 320 अग,त -10 ककककुुुुलललल ((((रररराााा""""यय यय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे )))) 222222220000 11117777000022227777 ककककुुुुलललल ((((अअअअििििखखखखलललल भभभभााााररररतततत )))) 222222220000 11117777666688887777 ककककुुुुलललल ((((अअअअििििखखखखलललल भभभभााााररररतततत )))) ((((444400000000 33331111666655557777 ++++222222220000))))ककककेेेेववववीीीी¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 583 अअअअननननबबुुबबुु धधंंधधंं 6666....5555 2222000011111111----11112222 ककककेेेे ददददौौौौरररराााानननन बबबबढ़ढ़ढ़ढ़ााााईईईई गगगगईईईई पपपपााााररररेेेेषषषषणणणण (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी 2222000011111111----11112222 ककककेेेे ददददौौौौरररराााानननन (cid:12)(cid:12)(cid:12)(cid:12)थथ थथ ााााििििपपपपतततत कककक.... गगगगईईईई पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन 33331111....00003333....2222000011112222कककक(cid:18)(cid:18)(cid:18)(cid:18) िििि(cid:23)(cid:23)(cid:23)(cid:23)थथथथिििितततत ककककेेेे अअअअननननससुुससुु ाााारररर >>>> पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन ककककाााा ननननाााामममम ससससYYYYककककटटटट कककक.... VVVV>>>>ययययाााा5555वव वव ययययनननन एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ललललााााइइइइनननन सससस..ंं..ंं ससससaaंंaaंं यय यय ाााा.... कककक....ललललबबंंबबंं ााााईईईई ((((ससससीीीीककककेेेेएएएएमममम)))) IIII.... 777766665555 ककककेेेेववववीीीी ललललााााइइइइनननन कककक(cid:27)(cid:27)(cid:27)(cid:27)CCCCीीीीयययय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे 1 टेहरी पुGलग *व ाइंट (400 केवी पर आवेिशत 2xडी/सी पीजीसीआईएल 13 होने वाला) पर टेहरी-मेरठ का एलआईएलओ 2 गया -बिलया( भाग लाइन ) एस/सी पीजीसीआईएल 69 3 सतना - बीना लाइन –I एस/सी पीजीसीआईएल 274 4 िuतीय एस/सी िसवनी (पीजी)–वधा( (पीजी) एस/सी पीजीसीआईएल 261 लाइन (शुWआत म(cid:19) 400 केवी पर संचािलत होने वाली) 5 बिलया-लखनऊ एस/सी पीजीसीआईएल 320 6 गया - बिलया (बचा भाग) एस/सी पीजीसीआईएल 159 7 बीना – इंदौर एस/सी पीजीसीआईएल 311 8 गया - एस/सी पीजीसीआईएल 148 9 ड(cid:4)(cid:18) य ूआर पुGलग *व ाइंट (िबलासपुर पुGलग एस/सी पीजीसीआईएल 8 *व ाइंट) पर िसपट-िसवनी का एलआईएलओ 10 ड(cid:4)(cid:18) य ूआर पुGलग *व ाइंट (िबलासपुर पुGलग एस/सी पीजीसीआईएल 8 *व ाइंट) पर िसपट-िसवनी का एलआईएलओ (िuतीय स6कट) 11 सासाराम-फतेहपुर लाइन –I एस/सी पीजीसीआईएल 337 ववववषषषष (cid:3)(cid:3) (cid:3)(cid:3)ककककेेेे ददददौौौौरररराााानननन पपपपणणूूणणूू ""(cid:3)(cid:3)""(cid:3)(cid:3) पपपपणणेेणणेे (cid:23)(cid:23)(cid:23)(cid:23)थथ थथ ााााििििपपपपतततत ((((ससससीीीीएएएएसससस)))) ककककाााा ककककुुुुलललल ससससीीीीककककेेेेएएएएमममम 1111999900008888 रररराााा""""यय यय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे 1 उ3न ाव म(cid:19) 765 केवी अनपरा-उ3न ाव कV एस/सी यूपीपीटीसीएल 1 िशGBटग 2 अनपरा बी से अनपरा सी एसड(cid:4)(cid:18) य ू याड ( म(cid:19) एस/सी यूपीपीटीसीएल 1 अनपरा बी-उ3न ाव टtमनेशन *व ाइंट कV िशGBटग ककककुुुुलललल रररराााा""""यय यय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे 2222 ककककुुुुलललल 777766665555ककककेेेेववववीीीी ललललााााइइइइनननन ((((अअअअििििखखखखलललल भभभभााााररररतततत )))) 1111999911110000584 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन ककककाााा ननननाााामममम ससससYYYYककककटटटट कककक.... ससससaaंंaaंं यय यय ाााा.... VVVV>>>>ययययाााा5555वव वव ययययनननन ललललााााइइइइनननन कककक....ललललबबंंबबंं ााााईईईई एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ((((ससससीीीीककककेेेेएएएएमममम)))) एएएएचचचचववववीीीीडडडडीीीीससससीीीी बबबबााााईईईईपपपपोोोोलललल +/- 500 केवी मुं4ा-मोGहदरगढ़ बाइपोल अअअअददददााााननननीीीी 1980 कुल((((एचवीडीसी)))) 1111999988880000 >>>> पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन ककककाााा ननननाााामममम ससससYYYYककककटटटट कककक.... ससससaaंंaaंं यय यय ाााा.... VVVV>>>>ययययाााा5555वव वव ययययनननन ललललााााइइइइनननन कककक....ललललबबंंबबंं ााााईईईई सससस..ंं..ंं एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ((((ससससीीीीककककेेेेएएएएमममम)))) IIIIIIII.... 444400000000 ककककेेेेववववीीीी ललललााााइइइइनननन कककक(cid:27)(cid:27)(cid:27)(cid:27)CCCCीीीीयययय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे 1 कोडरमा-िबहारशरीफ ((cid:25)व ैद) डी/सी पीजीसीआईएल 222 2 कोरबा एसटीपी- रायपुर डी/सी पीजीसीआईएल 424 3 Gसहा4ी टीपीएस पर 400 केवी डी/सी डी/सी पीजीसीआईएल 22 गाजुवाका-वेमािगरी का एलआईएलओ 4 मैसूर-ह,स न डी/सी पीजीसीआईएल 192 5 राउरकेला – रायगढ़ डी/सी पीजीसीआईएल 420 6 वे(cid:18)ल ूर टीपीएस पर आलामाथी-†ेपेWDब दरु डी/सी on पीजीसीआईएल 131 का एलआईएलओ एम/सी 7 (पीजी)-पालC (पीजी) डी/सी पीजीसीआईएल 674 8 बा(cid:10)रपाडा-म(cid:19)ढाल डी/सी पीजीसीआईएल 546 9 फर(cid:25)क ा- कहलगांव (िuतीय लाइन ) डी/सी पीजीसीआईएल 190 10 िभवानी म(cid:19) बवाना/बहादरु गढ़-िहसार लाइन डी/सी पीजीसीआईएल 27 का एलआईएलओ 11 प(cid:10)टयालाम(cid:19) नालागढ़-कैथल के Gजद स6कट डी/सी पीजीसीआईएल 22 का एलआईएलओ 12 कैथल म(cid:19) प(cid:10)टयाला-िहसार का एलआईएलओ डी/सी पीजीसीआईएल 66 13 मुं4ा-ब>च ाउ डी/सी पीजीसीआईएल 198 14 यूआरआई I – यूआरआई II एस/सी पीजीसीआईएल 11 15 ब>च ाउ-रणछोड़पुर डी/सी पीजीसीआईएल 566 16 प(cid:10)टयाला-लुिधयाना डी/सी पीजीसीआईएल 156 17 कोरबा(एनटीपीसी)-िRGसहपुर डी/सी पीजीसीआईएल 8 (एमपीजेनको) (लाइन 8 सीकेएम के भाग कV ,थ ापना आकि,मक sय व,थ ा के िलए कV गई) 18 मेिजया-मैथन डी/सी पीजीसीआईएल 114 19 मुं4ा-Gलबडी ( भाग लाइन) एस/सी पीजीसीआईएल 384 20 मुव&त ुपूझा (पीजी) – नॉथ( ि9चुर (पीजी) डी/सी पीजीसीआईएल 157¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 585 20 िभवानी म(cid:19) बवाना/बहादरु गढ़-िहसार लाइन डी/सी पीजीसीआईएल 97 का एलआईएलओ 21 फतेहपुर म(cid:19) इलाहाबाद-कानपुर का डी/सी पीजीसीआईएल 31 एलआईएलओ 22 लखनऊ(3य )ू -लखनऊ लाइन- II((cid:25)व ैद) डी/सी पीजीसीआईएल 6 23 मैथन(आरबी)-रांची डी/सी पीजीसीआईएल 376 24 यूआरआई II –वगूरा एस/सी पीजीसीआईएल 105 25 िबहारशरीफ-सासाराम(स6कट-। और स6कट- डी/सी पीजीसीआईएल 318 ।। का भाग) 26 फतेहपुर म(cid:19) Gसगरौली-कानपरु का डी/सी पीजीसीआईएल 41 एलआईएलओ 27 नीमराना-िसकर डी/सी पीजीसीआईएल 352 28 तूतीको(cid:10)रन जेवी-मदरु ई डी/सी पीजीसीआईएल 304 29 दगु ा(पुर-मैथन लाइन डी/सी पीजीसीआईएल 146 30 कोरबा(एनटीपीसी)- डी/सी पीजीसीआईएल 446 बीरGसहपुर(एमपीजेनको) (बचा भाग) 31 शाहजहांपुर म(cid:19) लखनऊ-बरेली लाइन (पीजी) डी/सी पीजीसीआईएल 32 के दोन^ स6कट का एलआईएलओ 32 पंचकुला म(cid:19) नाथ*प ा झाकरी- डी/सी पीजीसीआईएल 102 अ(cid:4)द (cid:18)ु ल ापुर((cid:10)(cid:26)पल ,न ोबाड)( के दोन^ स6कट का एलआईएलओ 33 मुं4ा-Gलबडी डी/सी पीजीसीआईएल 244 34 िबहारशरीफ-सासाराम (स6कट-।। का शेष डी/सी पीजीसीआईएल 80 भाग) 35 इंदौर-इंदौर (एमपीपीटीएल) डी/सी पीजीसीआईएल 50 36 कलप(cid:25)क म-अtण डी/सी पीजीसीआईएल 213 37 िबदाडी म(cid:19) नीलमंगला-सोमनह(cid:18)ल ी का डी/सी पीजीसीआईएल 28 एलआईएलओ 38 पल(cid:25)क ड म(cid:19) उडुमालपेट-ि9चुर का डी/सी पीजीसीआईएल 49 एलआईएलओ 39 सासन म(cid:19) Gवcय ाचल-जबलपुर के दोन^ स6कट 2xडी/सी पीजीसीआईएल 13 का एलआईएलओ 40 मौदा एसटीपीएस-वधा( लाइन ((cid:25)व ैद) डी/सी पीजीसीआईएल 124 (स6कट-1) ककककुुुुलललल 444400000000 ककककेेेेववववीीीी ((((पपपपीीीीजजजजीीीी)))) 7777666688887777 ककककुुुुलललल 444400000000 ककककेेेेववववीीीी डडडडीीीीववववीीीीससससीीीी 0000 ककककुुुुलललल कककक(cid:27)(cid:27)(cid:27)(cid:27)CCCCीीीीयययय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ((((444400000000 ककककेेेेववववीीीी)))) 7777666688887777586 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] रररराााा""""यय यय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे 1 सागरदीघी-पWिलया (पीजीसीआईएल) डी/सी पर ड(cid:4)(cid:18) य ूबीईटीसीएल 255 एस/सी 2 वािडनार (ए,स ार)-हडाला डी/सी जीईटीसीओ 226 3 सुंगुवर89म 400 केवी सब-,ट ेशन पर डी/सी टीएएन(cid:26)ां,क ो 16 †ीपेरंबुदरु -पुदचु ेरी का एलआईएलओ 4 नुिहयावाली म(cid:19) िहसार-फतेहाबाद का डी/सी एचवीपीएनएल 153 एलआईएलओ 5 एमजी झ2ज र (सीएलपी) पर झ2ज र डी/सी एचवीपीएनएल 10 (एपीसीपीएल)-दौलताबाद लाइन का एलआईएलओ 6 जैसलमेर-जोधपुर एस/सी आरवीपीएनएल 239 7 भुसाबल - II – औरंगाबाद डी/सी एमएसईटीसीएल 185 8 3य ू भुसावल – औरंगाबाद डी/सी एमएसईटीसीएल 179 9 कोसांबा म(cid:19) असोज-उकाई का एलआईएलओ डी/सी जीईटीसीओ 64 10 झ2ज र-धन^डा डी/सी एचवीपीएनएल 40 11 झ2ज र-कबुलपुर डी/सी एचवीपीएनएल 70 12 कबुलपुर-दीपलपुर डी/सी एचवीपीएनएल 133 13 दीपलपुर म(cid:19) अ(cid:4)द (cid:18)ु ल ापुर-बवाना का डी/सी एचवीपीएनएल 2 एलआईएलओ 14 बीटीपीएस-िह(cid:10)रयरु डी/सी केपीटीसीएल 313 ककककुुुुलललल रररराााा""""यय यय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ((((444400000000 ककककेेेेववववीीीी)))) 1111888888885555 ििििननननजजजजीीीी (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे 1 पुण(े पीजी) म(cid:19) लोनीखंड डी/सी आरपीटीएल 3 (एमएसईटीसीएल)- कलवा(एमएसईटीसीएल) का एलआईएलओ 2 िलDड ी (चोरािनया (गेटको)- रामछोड़पुर डी/सी आरपीटीएल 206 (वडािव) (गेटको) 3 जैगड़-कराड डी/सी जेपीटीएल 219 4 कसाइप(cid:18)ल ी म(cid:19) कोरबा-भाटापारा का डी/सी एसीबी 6 एलआईएलओ 5 पालC (पीजी) – सोलापुर (पीजी) डी/सी आरपीटीएल 272 6 रणछोड़पुरा (वडाबी) (गेटको)- जेदा( डी/सी आरपीटीएल 282 ( कंसारी (गेटको) 7 बा(cid:18)क ो टीपीएस म(cid:19) कोरबा-िRGसहपुर का डी/सी बा(cid:18)को 35 एलआईएलओ 8 एनज(न टीपीपी म(cid:19) मदरु ई-एनएलसी का डी/सी सीजीपीएल 52 एलआईएलओ¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 587 9 महान सब-,ट ेशन पर Gवcय ाचल-कोरबा डी/सी ए,सार 44 लाइन का एलआईएलओ 10 मीना8ी-ने(cid:18)ल ोर एस/सी एमईएल 26 11 िसDह ापुरी-मीना8ी डी/सी एमईएल 2 12 िसDह ापुरी-ने(cid:18)ल ोर एस/सी एमईएल 26 13 शाहजहांपुर म(cid:19) (पीजीसीआईएल) लखनऊ- डी/सी आरपीटीएल 29 बरेली का एलआईएलओ 14 शाहजहांपुर म(cid:19) लखनऊ-बरेली के डी/सी आरपीटीएल 15 ((cid:10)रलांयस) का एलआईएलओ ककककुुुुलललल ििििननननजजजजीीीी (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ((((444400000000 ककककेेेेववववीीीी)))) 1111222211117777 ककककुुुुलललल 444400000000 ककककेेेेववववीीीी ललललााााइइइइनननन ((((अअअअििििखखखखलललल भभभभााााररररतततत )))) 11110000777788889999 >>>> पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन ककककाााा ननननाााामममम ससससYYYYककककटटटट कककक.... VVVV>>>>ययययाााा5555वव वव ययययनननन ललललााााइइइइनननन कककक.... सससस..ंं..ंं ससससaaंंaaंं यय यय ाााा.... एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ललललबबंंबबंं ााााईईईई ((((ससससीीीीककककेेेेएएएएमममम)))) IIIIIIIIIIII.... 222222220000 ककककेेेेववववीीीी कककक(cid:27)(cid:27)(cid:27)(cid:27)CCCCीीीीयययय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे 1 चमेरा-।। एचईपी के नजदीक चमेरा-।।।-पुGलग ,ट ेशन डी/सी पीजीसीआईएल 30 2 कलप(cid:25)क म पीएफबीआर-िसWचेरी डी/सी पीजीसीआईएल 72 3 फतेहपुर म(cid:19) 220 केवी डी/सी फतेहपुर (यूपीपीसीएल)- डी/सी पीजीसीआईएल 23 कानपुर(यूपीपीसीएल) का एलआईएलओ 4 गया म(cid:19) डहे री-बोधगया के .थम स6कट का डी/सी पीजीसीआईएल 24 एलआईएलओ 5 िसकर म(cid:19) .थम स6कट िसकर (आरवीपीएन), रतनगढ़ डी/सी पीजीसीआईएल 6 का एलआईएलओ 6 गया म(cid:19) डहे री-बोधगया का एलआईएलओ डी/सी पीजीसीआईएल 24 ककककुुुुलललल पपपपीीीीजजजजीीीीससससीीीीआआआआईईईईएएएएलललल 111177779999 ककककुुुुलललल ससससीीीीककककेेेेएएएएमममम 222222220000 ककककेेेेववववीीीी ललललााााइइइइनननन कककक(cid:18)(cid:18)(cid:18)(cid:18)((((डडडडीीीीववववीीीीससससीीीी)))) 0000 ककककुुुुलललल ससससीीीीककककेेेेएएएएमममम 222222220000 ककककेेेेववववीीीी ललललााााइइइइनननन कककक(cid:18)(cid:18)(cid:18)(cid:18)((((ससससीीीीएएएएसससस)))) 111177779999 रररराााा""""यय यय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे 1 मोहाना-,म लखा लाइन डी/सी एचवीपीएनएल 55 2 दवे ास-आ,थ ा डी/सी एमपीपीटीसीएल 144 3 चकन सब-,ट ेशन पर भोसा(cid:10)र-Gचचवाड का डी/सी on एमएसईटीसीएल 17 एलआईएलओ एम/सी 4 बीकानेर जीएसएस म(cid:19) बीकानेर-†ीदनू गरगढ़ एस/सी आरवीपीएनएल 7 लाइन का एलआईएलओ588 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 5 जीएसएस सवा म(cid:19) िच&त ौरगढ़-Gनबाहरे ा का डी/सी आरवीपीएनएल 5 एलआईएलओ 6 िभवानी जीएसएस(पीजी) म(cid:19) िसरोही- डी/सी आरवीपीएनएल 10 िभनमल का एलआईएलओ 7 बरदोली (मोटा) म(cid:19) उकाई(टी)-वीएवी के डी/सी जीईटीसीओ 10 िuतीय स6कट का एलआईएलओ 8 बीना765 3य ू सब-,ट ेशन (पीजी) पर बीना- डी/सी एमपीपीटीसीएल 2 िशवपुरी के .थम स6कट का एलआईएलओ 9 लालW म(cid:19) मोहाली-डरे ा ब,स ी का एस/सी पीटीसीएल 34 एलआईएलओ 10 झुणीर म(cid:19) सुनाम-मंसा लाइन का डी/सी पीटीसीएल 68 एलआईएलओ 11 दवे ा(cid:25)क ु(cid:10)रची-पुधनचंदाई डी/सी पर टीएएन(cid:26)ां,क ो 84 एस/सी 12 करमवयम(िनDम ेली िथ*प ीयाकुडी) म(cid:19) डी/सी टीएएन(cid:26)ां,क ो 17 िथWवWर-कराइकुडी का एलआईएलओ 13 ओथा(cid:25)क ालमंडपम(मालूिमचंपKी)-प(cid:18)ल दम एस/सी टीएएन(cid:26)ां,क ो 53 14 कानपुर दि8ण म(cid:19) फतहे पुर-पनकV का डी/सी यूपीपीटीसीएल 7 एलआईएलओ 15 ल(cid:25)क ासाSाम-नंसुर(cid:18)ल ा डी/सी एपी (cid:26)ां,क ो 7 16 भाट-िपराना लाइन डी/सी जीईटीसीओ 29 17 चोरमार-रािनया लाइन वाया नुिहयानवली डी/सी एचवीपीएनएल 73 18 लुला अिहर म(cid:19) दादरी-रेवारी का डी/सी एचवीपीएनएल 9 एलआईएलओ 19 सेवा-छाजपुर लाइन डी/सी एचवीपीएनएल 27 20 ,म लखा-छाजपुर डी/सी एचवीपीएनएल 50 21 बान(-िबiन ा-हीरा नगर डी/सी जेकेपीडीडी 180 22 वीएसएनएल सब-,ट ेशन पर लोनीखंडा- डी/सी एमएसईटीसीएल 4 खड़कV लाइन का एलआइएलओ 23 जेजुरी सब-,ट ेशन पर पाव(ती-फुरसुंगी लाइन डी/सी एमएसईटीसीएल 62 का एलआईएलओ 24 तुलजापुर म(cid:19) पालC(मुWद)-सोलापुर लाइन डी/सी एमएसईटीसीएल 6 का एलआईएलओ 25 फोकल *व ाइंट नाभा-फागन माजरा 400 डी/सी पीटीसीएल 33 केवी सब-,ट ेशन 26 अकाल-भू लाइन डी/सी आरवीपीएनएल 17 27 न(cid:18)ल ामनइकेनपKी म(cid:19) चेकनुरानी-अमाथापुरम डी/सी टीएएन(cid:26)ां,क ो 30 का एलआईएलओ 28 Sेटर नोएडा-नोएडा से(cid:25)ट र 129 डी/सी यूपीपीटीसीएल 24 29 िबठुर म(cid:19) पनकV-उ3न ाव का एलआईएलओ एस/सी यूपीपीटीसीएल 14¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 589 30 काठलगुरी-ितनसु7कया (िuतीय स6कट) एस/सी एईजीसीएल 24 31 रमागुंडम-बे(cid:18)ल ामप(cid:18)ल ी डी/सी पर एपी (cid:26)ां,क ो 37 एस/सी 32 कोसांबा-जगािडया लाइन डी/सी जीईटीसीओ 49 33 कांगािसयाली म(cid:19) ग^डल-राजकोट लाइन का डी/सी जीईटीसीओ 28 एलआईएलओ 34 कशांग-भाबा (.थम स6कट) डी/सी एचपीईबीएल 37 35 लुला अहीर-धन^डा लाइन एस/सी एचवीपीएनएल 40 36 वाठेर म(cid:19) कराड-को(cid:18)ह ापुर डी/सी का डी/सी एमएसईटीसीएल 20 एलआईएलओ 37 तालेगांव 400 केवी (पीजी) सब-,ट ेशन- डी/सी एमएसईटीसीएल 20 तालेगांव 220 केवी सब-,ट ेशन 38 लुिधयाना म(cid:19) लैटन कला-ं धंडारी के .थम डी/सी पीटीसीएल 5 स6कट का एलआईएलओ 39 पKी- अलगांव लाइन डी/सी पर पीटीसीएल 20 एस/सी 40 ढोणे एसड(cid:4)(cid:18) य ू. ,ट ेशन पर गुटी- 2xडी/सी एपी (cid:26)ां,क ो 114 सोमयाजुलाप(cid:18)ल ी के दोन^ स6कट का एलआईएलओ 41 िवजयवाडा टीपीएस-त(cid:18)ल ाप(cid:18)ल ी डी/सी एपी (cid:26)ां,क ो 266 42 टेमघर म(cid:19) पागढे-कलवा का एलआईएलओ डी/सी एमएसईटीसीएल 3 43 भ4ा-िचरावा एस/सी आरवीपीएनएल 109 44 भीनमल(पीजी)-संचोर (आरवीपीएन) और एस/सी आरवीपीएनएल 18 भीनमल(पीजी)- भीनमल(आरवीपीएन) 45 छाबरा टीपीएस- झालावाड़ एस/सी आरवीपीएनएल 101 46 हजैरा(जीएसईसी)-कोसांबा डी/सी जीईटीसीओ 125 47 फतेहाबाद-चोरमार लाइन डी/सी एचवीपीएनएल 158 48 aमनाबाद-हलबरागा डी/सी केपीटीसीएल 79 49 िचकमगलूर म(cid:19) िशमोगा-मैसूर का डी/सी केपीटीसीएल 57 एलआईएलओ 50 वॉ(cid:25)स वैगन-मेसस( मGह4ा सब-,ट ेशन एस/सी एमएसईटीसीएल 3 51 पलमनेW-िच&त ूर डी/सी पर एपी (cid:26)ां,क ो 58 एस/सी 52 3य ारा-तेभदा (स6कट-।) एस/सी जीईटीसीओ 90 53 धन^डा-दिधबाना लाइन डी/सी एचवीपीएनएल 34 54 दचे ू-ितनवारी एस/सी आरवीपीएनएल 71 55 सुंगुवरछ9म-ओरागाडम डी/सी पर टीएएन(cid:26)ां,क ो 10 एस/सी590 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 56 ढोणे-कृJण ािगरी डी/सी पर एपी (cid:26)ां,क ो 11 एस/सी 57 रेगुलापडु (शेष काय() म(cid:19) गुटी-अिलपुर का डी/सी एपी (cid:26)ां,क ो 22 एलआईएलओ 58 पूवC .भाग कंपाउंड-बंगलौर म(cid:19) एचएएल यूजीकेबल केपीटीसीएल 8 59 आरटीपीएस-रायचूर डी/सी केपीटीसीएल 35 60 भुसावल-।।-अमलनेर डी/सी एमएसईटीसीएल 197 61 िभलंगाना III- घंसाली (गुXटु) डी/सी पीटीसीयूएल 38 62 मा9े (पीजी)- नेहतौर एस/सी यूपीपीटीसीएल 75 63 संपला म(cid:19) बहादरु गढ़-रोहतक लाइन का डी/सी एचवीपीएनएल 48 एलआईएलओ 64 दौलताबाद-मउ डी/सी एचवीपीएनएल 76 65 अकोला –बालापुर लाइन डी/सी एमएसईटीसीएल 54 66 बाभलेiव र-चालीसगांव(कोपरगांव टैप डी/सी एमएसईटीसीएल 74 *व ाइंट तक) 67 बंभोरी-अमलनेर लाइन एस/सी एमएसईटीसीएल 38 68 दीपनगर-बंभोरी एस/सी एमएसईटीसीएल 70 69 हािमदवाडा म(cid:19) को(cid:18)ह ापुर-फ^डा का डी/सी एमएसईटीसीएल 4 एलआईएलओ 70 भांडुप म(cid:19) मुलुंड-बो(cid:10)रबली का एलआईएलओ यूजीकेबल एमएसईटीसीएल 2 71 िनवाली लाइन पर पेढांबे-खरेपटन का एस/सी एमएसईटीसीएल 33 एलआईएलओ 72 ओिन लाइन पर पेढांबे-खरेपटन का एस/सी एमएसईटीसीएल 1 एलआईएलओ 73 एमआईडीसी चं4पुर सब-,ट ेशन-मेसस( एस/सी एमएसईटीसीएल 12 जीईपीएल (स6कट-।) 74 कलप(cid:25)क ा सब-,ट ेशन-एमएस. Rgिड(cid:25)स (शेष डी/सी एपी (cid:26)ां,क ो 19 भाग) 75 महारानी बाग-(cid:26)ामा स(cid:19)टर/एआईआईएमएस डी/सी डीटीएल 19 (यूजी केबल) 76 भु(cid:10)टया-खेरालु लाइन डी/सी जीईटीसीओ 99 77 वगा(- आरवीएनएल लाइन डी/सी जीईटीसीओ 18 78 मैहर म(cid:19) सतना (पीजीसीआइएल)-कटनी का डी/सी एमपीपीटीसीएल 4 एलआईएलओ 79 फुसुzगी-जेजुरी लाइन डी/सी एमएसईटीसीएल 60 80 िभवाडी (पीजीसीआईएल)-नीमराना (शेष एस/सी आरवीपीएनएल 6 भाग) 81 चरंका-जंगराल लाइन डी/सी जीईटीसीओ 32 82 शाहपुर म(cid:19) जेतपुर-केशोड लाइन का डी/सी जीईटीसीओ 3 एलआईएलओ¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 591 83 बKा म(cid:19) कैथल-नवा(ना का एलआईएलओ डी/सी एचवीपीएनएल 4 84 गुड़गांव से(cid:25)ट र-56 म(cid:19) पाली-गुड़गांव से(cid:25)ट र- डी/सी एचवीपीएनएल 1 52ए का एलआईएलओ 85 नर(cid:19)4 400केवी सब-,ट ेशन-महाGलगापुर डी/सी केपीटीसीएल 246 86 महiे व र-िपतमपुर डी/सी एमपीपीटीसीएल 115 87 ओसमानाबाद-बरषी (िuतीय स6कट) एस/सी एमएसईटीसीएल 44 88 साउथ सोलापुर(पीजी)-साउथ सोलापुर डी/सी एमएसईटीसीएल 6 89 रेहाना जKन म(cid:19) जमशेर-मिहलपुर का डी/सी पीटीसीएल 10 एलआईएलओ 90 7कशनगढ़ म(cid:19) िभवाडी-अलवर लाइन का एस/सी आरवीपीएनएल 5 एलआईएलओ 91 पदमपुर-उ!ोगिवहार एस/सी आरवीपीएनएल 42 92 एमटीपीएस ,ट ेज III-प(cid:18)ल कापलयम एस/सी टीएएन(cid:26)ां,क ो 6 93 एमटीपीएस ,ट ेज III- गोबी एस/सी टीएएन(cid:26)ां,क ो 3 94 बुला(-बोलंिगर, (िuतीय स6कट) एस/सी ओपीटीसीएल 118 95 Gचचोली(पीजीसीआईएल)-सोलापुर डी/सी एमएसईटीसीएल 5 96 िचतेगांव-श(cid:19)4ा डी/सी एमएसईटीसीएल 57 97 चुि(cid:18)लयार (म3न ुकड)-पल(cid:25)क ड डी/सी केईबी 8 98 Sेटर नोएडा- आईटी िसटी गरबारा एस/सी यूपीपीटीसीएल 11 99 जबलपुर-जबलपुर डी/सी एमपीपीटीसीएल 12 100 खापरखेडा टीपीएस-खापरखेडा (मौजूदा) 2xडी/सी एमएसईटीसीएल 12 101 7करोरी-समैन लाइन डी/सी एचवीपीएनएल 68 102 िसपारा(3य )ू म(cid:19) फतुहा-खगौल का डी/सी बीईबी 19 एलआईएलओ 103 करामदाई म(cid:19) अरासुर-xगुर का एलआईएलओ डी/सी टीएएन(cid:26)ां,क ो 6 104 (जीआईएस) कुंडा कV ढाणी म(cid:19) ब,स ी-कुकस डी/सी आरवीपीएनएल 8 का एलआईएलओ 105 टडाली म(cid:19) चं4पुर जीसीआर-चं4पुर डी/सी एमएसईटीसीएल 2 एमआईडीसी का एलआईएलओ 106 आसपुर म(cid:19) डबे ारी-बंसवारा का एलआईएलओ डी/सी आरवीपीएनएल 2 107 हा(cid:18)व ड म(cid:19) धंगाढरा-लालपुर का डी/सी जीईटीसीओ 4 एलआईएलओ 108 लालपुर म(cid:19) धंगाढरा-मोबC लाइन का डी/सी जीईटीसीओ 13 एलआईएलओ 109 पीपावव (जीपीपीसी) (लाइन-1) पर डी/सी जीईटीसीओ 91 सावरकुंडला-माहवा(ओथा) का एलआईएलओ592 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 110 एलओसी 30 के सावरकुंडला-मaआ पर डी/सी जीईटीसीओ 16 सावरकुंडला-अ(cid:18)(cid:26) ाटेक(पुराना) का एलआईएलओ 111 लालत^कला-ं सहनेवाल (एक स6कट) डी/सी पीटीसीएल 7 112 पटना(पीजी)-िसपारा(बीएसईबी) के बीच डी/सी बीईबी 1 Gलक लाइन 113 डी/सी डीटीएल 17 महारानी बाग-एचसी माथुर लेन(इलेि(cid:25)(cid:26)क लेन) 114 महारानी बाग-मि,जद मोठ डी/सी डीटीएल 18 115 मलकारम-गनरॉक डीसी एपी (cid:26)ां,क ो 32 यूजीकेबल 116 मालवा टीपीपी-छेगांव डी/सी एमपीपीटीसीएल 95 117 3य ारा-तेवडा (िuतीय स6कट) एस/सी जीईटीसीओ 90 118 प(cid:10)र>छ ा-बांदा एस/सी यूपीपीटीसीएल 210 119 राज वे,ट -ढोरीमाना एस/सी आरवीपीएनएल 83 120 रोजा-बदाउन (िuतीय स6कट) एस/सी यूपीपीटीसीएल 96 121 संखारी-जंगराल लाइन डी/सी जीईटीसीओ 65 122 सारनाथ(400)-बीरापKी एस/सी यूपीपीटीसीएल 23 123 वराही-खेमार (पाट( लाइन) डी/सी केपीटीसीएल 150 222222220000 ककककेेेेववववीीीी ललललााााइइइइनननन ((((ससससबबबब(cid:23)(cid:23)(cid:23)(cid:23)टट टट ेेेेशशशशनननन ))))ककककाााा ककककुुुुलललल 5555555533334444 ससससीीीीककककेेेेएएएएमममम ििििननननजजजजीीीी (cid:31)(cid:31)(cid:31)(cid:31) ेे ेे 1 छौर म(cid:19) एलेन दहु गं न-नालागढ़ का डी/सी ईपीसीएल 2 एलआईएलओ 2 बुिधल-चमेरा III डी/सी एलईपीपी 40 222222220000 ककककेेेेववववीीीी ललललााााइइइइनननन ((((पपपपीीीीएएएएसससस ))))ककककाााा ककककुुुुलललल ससससीीीीककककेेेेएएएएमममम 44442222 ककककुुुुलललल रररराााा""""यय यय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे 3333444455552222 ककककुुुुलललल 222222220000 ककककेेेेववववीीीी((((अअअअििििखखखखलललल भभभभााााररररतततत )))) 5555777755555555 ककककुुुुलललल अअअअििििखखखखलललल भभभभााााररररतततत ((((777766665555++++444400000000++++222222220000 ककककेेेेववववीीीी)))) 22220000444433334444¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 593 ववववषषषष !! !!2222000011111111----11112222 ककककेेेे ददददौौौौरररराााानननन (cid:12)(cid:12)(cid:12)(cid:12)थथ थथ ााााििििपपपपतततत ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट ट ट ेेशशेेशशनननन 33331111....00003333....2222000011112222 कककक(cid:18)(cid:18)(cid:18)(cid:18) िििि(cid:23)(cid:23)(cid:23)(cid:23)थथथथिििितततत ककककेेेे अअअअननननससुुससुु ाााारररर >>>>.... ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट ट ट ेेशशेेशशनननन ककककाााा ननननाााामममम ववववोोोो4444टट टट ेेजजेेजज VVVV>>>>ययययाााा5555वव वव ययययनननन (cid:7)(cid:7)(cid:7)(cid:7)ममममतततताााा पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा ममममााााहहहह सससस..ंं..ंं अअअअननननपपुुपपुु ाााातततत एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ((((एएएएमममम डडडड(cid:2)(cid:2)(cid:2)(cid:2)44 44 यय यय ूू ूू //// एएएएममममववववीीीीएएएए)))) ((((ककककेेेेववववीीीी////ककककेेेेववववीीीी)))) 777766665555 ककककेेेेववववीीीी कककक(cid:27)(cid:27)(cid:27)(cid:27)CCCCीीीीयययय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे 1 बिलया (नया) (.थम (cid:26)ांसफाम(र) 765/400 पीजीसीआईएल 1500 7दसDब र-11 2 लखनऊ (नया) (.थम (cid:26)ांसफाम(र) 765/400 पीजीसीआईएल 1500 7दसDब र-11 3 बिलया सब-,ट ेशन (िuतीय 765/400 पीजीसीआईएल 1500 फरवरी-12 (cid:26)ांसफाम(र) 4 लखनऊ(िuतीय (cid:26)ांसफाम(र) 765/400 पीजीसीआईएल 1500 फरवरी-12 5 वधा( 765/400 पीजीसीआईएल 3000 फरवरी-12 6 फतेहपुर 765/400 पीजीसीआईएल 3000 माच(-12 7 गया 765/400 पीजीसीआईएल 3000 माच(-12 8 िसपत के नजदीक ड(cid:4)(cid:18) य ूआर पुGलग 765/400 पीजीसीआईएल 3000 माच(-12 ,ट ेशन 9 वधा( तृतीय (cid:26)ांसफाम(र 765/400 पीजीसीआईएल 1500 माच(-12 ककककुुुुलललल ((((कककक(cid:27)(cid:27)(cid:27)(cid:27)CCCCीीीीयययय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे )))) 11119999555500000000 रररराााा""""यय यय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे 1111 उ3न ाव 765/400 यूपीपीटीसीएल 1000 माच(-12 ककककुुुुलललल ((((रररराााा""""यय यय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे )))) 1111000000000000 ककककुुुुलललल अअअअििििखखखखलललल भभभभााााररररतततत ((((777766665555ककककेेेेववववीीीी 22220000555500000000 ललललााााइइइइनननन))(cid:27)(cid:27)))(cid:27)(cid:27) (cid:1)(cid:1)(cid:1)(cid:1).... सससस..ंं..ंं ससससबबबब----(cid:2)(cid:2)(cid:2)(cid:2)टट टट ेेशशेेशशनननन ककककाााा ननननाााामममम ववववोोोो(cid:8)(cid:8)(cid:8)(cid:8)टटटट ेेजजेेजज (cid:9)(cid:9)(cid:9)(cid:9)(cid:1)(cid:1)(cid:1)(cid:1)ययययाााा(cid:12)(cid:12)(cid:12)(cid:12)वव वव ययययनननन एएएएजजजजसस(cid:16)(cid:16)सस(cid:16)(cid:16) ीीीी (cid:19)(cid:19)(cid:19)(cid:19)ममममतततताााा पपपपणणूूणणूू (cid:27)(cid:27) (cid:27)(cid:27)हहहहोोोोनननन ेे ेेककककाााा ममममााााहहहह अअअअननननपपुुपपुु ाााातततत ((((एएएएमममम डडडड(cid:23)(cid:23)(cid:23)(cid:23)(cid:8)(cid:8) (cid:8)(cid:8) यय यय ूू ूू//// ((((ककककेेेेववववीीीी////ककककेेेेववववीीीी)))) एएएएममममववववीीीीएएएए)))) 444400000000 ककककेेेेववववीीीी कककक(cid:16)(cid:16)(cid:16)(cid:16)(cid:30)(cid:30)(cid:30)(cid:30)ीीीीयययय (cid:19)(cid:19)(cid:19)(cid:19)(cid:31)(cid:31)ेे(cid:31)(cid:31)ेे 1 रायपुर ए) सटेशन 400/220 पीजीसीआईएल 315 जून-11 2 शुजलपुर ((cid:28)थम आईसीटी) 400/220 पीजीसीआईएल 315 जून-11 3 ए) सट(cid:17)शन प*टयाला 400/220 पीजीसीआईएल 500 जुलाई -11594 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 4 ब5 चाउ सब-(cid:2) टेशन 400/220 पीजीसीआईएल 630 अग(cid:2) त-11 5 चमेरा-।। एचईपी के 400/220 पीजीसीआईएल 630 अग(cid:2) त-11 नजदीक जीआईएस पु(cid:20)लग (cid:2) टेशन 6 ए) सट(cid:17)शन बहादरु गढ़ 400/220 पीजीसीआईएल 500 अ) टूबर-11 7 पुणे ए) सट(cid:17)शन 400/220 पीजीसीआईएल 315 अ) टूबर-11 8 मुव7 तापुझा सब-(cid:2) टेशन 400/220 पीजीसीआईएल 315 नव(cid:6) बर-11 (ि0तीय आईसीटी) 9 शुजालपुर (ि0तीय 400/220 पीजीसीआईएल 315 नव(cid:6) बर-11 आईसीटी) 10 फतेहपुर ए) सट(cid:17)शन 400/220 पीजीसीआईएल 630 (cid:11)दस(cid:6) बर-11 11 नीमराना ((cid:28)थम 400/220 पीजीसीआईएल 315 (cid:11)दस(cid:6) बर-11 !ांसफाम(cid:27)र) 12 वधा(cid:27) ए) सट(cid:17)शन 400/220 पीजीसीआईएल 500 (cid:11)दस(cid:6) बर-11 13 गया ए) सट(cid:17)शन 400/220 पीजीसीआईएल 815 जनवरी-12 14 गुड़गांव जीआईएस सब- 400/220 पीजीसीआईएल 315 जनवरी-12 (cid:2) टेशन (ि0तीय आईसीटी) 15 लखनऊ सब-(cid:2) टेशन 400/220 पीजीसीआईएल 500 जनवरी-12 16 िसकर 400/220 पीजीसीआईएल 315 जनवरी-12 17 चूि3लयार 400/220 पीजीसीआईएल 315 फरवरी-12 18 पंचकुला 400/220 पीजीसीआईएल 630 फरवरी-12 19 िभवाड़ी ए) सट(cid:17)शन 400/220 पीजीसीआईएल 315 माच(cid:27)-12 20 िबडाडी (जीआई) सब- 400/220 पीजीसीआईएल 500 माच(cid:27)-12 (cid:2) टेशन 21 चूि3लयार (ि0तीय 400/220 पीजीसीआईएल 315 माच(cid:27)-12 !ांसफाम(cid:27)र) 22 नीमराना (ि0तीय 400/220 पीजीसीआईएल 500 माच(cid:27)-12 !ांसफाम(cid:27)र) 23 िसकर (ि0तीय आईसीटी) 400/220 पीजीसीआईएल 315 माच(cid:27)-12 24 िसलचर (नया) 400/220 पीजीसीआईएल 400 माच(cid:27)-12 ककककुुुुलललल पपपपीीीीजजजजीीीीससससीीीीआआआआईईईईएएएएलललल 11110000555511115555 कुल डीवीसी 0000 ककककुुुुलललल कककक(cid:16)(cid:16)(cid:16)(cid:16)(cid:30)(cid:30)(cid:30)(cid:30)ीीीीयययय (cid:19)(cid:19)(cid:19)(cid:19)(cid:31)(cid:31)(cid:31)(cid:31)ेेेे ((((444400000000 ककककेेेेववववीीीी ललललााााइइइइनननन))(cid:16)(cid:16)))(cid:16)(cid:16) 11110000555511115555 रररराााा####यय यय (cid:19)(cid:19)(cid:19)(cid:19)(cid:31)(cid:31)(cid:31)(cid:31)ेेेे 1 भुसाबल(आईसीटी-।) सब-(cid:2) टेशन 400/220 एमएसईटीसीएल 500 अग(cid:2) त-11 2 सुंगुवरछ:म 400/220 टीएएन!ां(cid:2) को 630 अग(cid:2) त-11¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 595 3 भुसाबल(आईसीटी-।।) सब-(cid:2) टेशन 400/220 एमएसईटीसीएल 500 िसतंबर-11 4 बाभले< वर सब-(cid:2) टेशन 400/220 एमएसईटीसीएल 500 (cid:11)दस(cid:6) बर-11 5 धुले सब-(cid:2) टेशन 400/220 एमएसईटीसीएल 500 (cid:11)दस(cid:6) बर-11 6 खापरखेडा सब-(cid:2) टेशन (2x500) 400/220 एमएसईटीसीएल 1000 (cid:11)दस(cid:6) बर-11 7 नागोठाने सब-(cid:2) टेशन 400/220 एमएसईटीसीएल 500 (cid:11)दस(cid:6) बर-11 8 (cid:11)दनोड (ि0तीय !ांसफाम(cid:27)र) 400/220 जीईटीसीओ 315 जनवरी-12 9 नुिहयावाली ((cid:28)थम !ांसफाम(cid:27)र) 400/220 एचवीपीएनएल 315 जनवरी-12 10 दीपलपुर सब-(cid:2) टेशन 400/220 एचवीपीएनएल 630 फरवरी-12 11 कबुलपुर सब-(cid:2) टेशन 400/220 एचवीपीएनएल 630 फरवरी-12 12 नुिहयावानी (ि0तीय और तृतीय 400/220 एचवीपीएनएल 630 फरवरी-12 आइसीटी) ककककुुुुलललल रररराााा####यय यय (cid:19)(cid:19)(cid:19)(cid:19)(cid:31)(cid:31)ेे(cid:31)(cid:31)ेे 6666666655550000 ककककुुुुलललल 444400000000 ककककेेेेववववीीीी((((पपपपीीीीएएएएसससस)))) 0000 ककककुुुुलललल अअअअििििखखखखलललल भभभभााााररररतततत ((((444400000000 ककककेेेेववववीीीी 11117777111166665555 ललललााााइइइइनननन))))(cid:16)(cid:16)(cid:16)(cid:16) >>>>.... ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट ट ट ेेशशेेशशनननन ककककाााा ननननाााामममम ववववोोोो4444टट टट ेेजजेेजज VVVV>>>>ययययाााा5555वव वव ययययनननन (cid:7)(cid:7)(cid:7)(cid:7)ममममतततताााा पपपपूणूणूणूण !! !!हहहहोोोोनननन ेे ेेककककाााा ममममााााहहहह सससस..ंं..ंं अअअअननननपपुुपपुु ाााातततत एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ((((एएएएमममम ((((ककककेेेेववववीीीी////ककककेेेेववववीीीी)))) डडडड(cid:2)(cid:2)(cid:2)(cid:2)44 44 यय यय ूू ूू //// एएएएममममववववीीीीएएएए)))) 222222220000 ककककेेेेववववीीीी कककक(cid:27)(cid:27)(cid:27)(cid:27)CCCCीीीीयययय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे 1 धनबाद (2x80) 220/33 डीवीसी 80 जून-11 2 रायबरेली (पावरिSड) 220/132 पीजीसीआईएल 100 िसतंबर-11 3 कोडरमा (2x150) 220/132 डीवीसी 320 माच(-12 4 कोडरमा (2x80) 220/33 डीवीसी 160 माच(-12 ककककुुुुलललल कककक(cid:27)(cid:27)(cid:27)(cid:27)CCCCीीीीयययय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे 660 रररराााा""""यय यय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे 1 Rाšणकोटकूर 220/11 एपी (cid:26)ां,क ो 25 अ.ैल-11 2 मलयाला 220/11 एपी (cid:26)ां,क ो 95 अ.ैल-11 3 सदायापालयम 230/33 टीएएन(cid:26)ां,क ो 100 अ.ैल-11 4 ओरागाडोम 230/110 टीएएन(cid:26)ां,क ो 100 अ.ैल-11 5 एलुंडुर (अित(cid:10)र(cid:25)त (cid:26)ांसफामर( ) 230/110 टीएएन(cid:26)ां,क ो 100 अ.ैल-11596 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 6 प^डा 220/110 ईएलइ 100 मई-11 िडपाट(म(cid:19)ट गोवा 7 ए(cid:25)स ेलडम 220/110 ईएलइ 100 मई-11 िडपाट(म(cid:19)ट गोवा 8 कुशालनगर (िuतीय 220/66 केपीटीसीएल 100 मई-11 (cid:26)ांसफाम(र) 9 वसाई 220/100 एमएसईटीसीएल 100 मई-11 10 जाठ (2x100) (.थम 220/132 एमएसईटीसीएल 100 मई-11 (cid:26)ांसफाम(र) 11 उस@ 220/22 एमएसईटीसीएल 50 मई-11 12 कानपुर दि8ण (3x60) (.थम 220/132 यूपीपीटीसीएल 60 मई-11 (cid:26)ांसफाम(र) 13 अमू(cid:18)ह ापुराम (अित(cid:10)र(cid:25)त 230/33 टीएएन(cid:26)ां,क ो 50 जून-11 (cid:26)ांसफाम(र) 14 ए ,ट ेशन कंपाउंड (आनंद राव 220/66 केपीटीसीएल 150 जून-11 स6कल) (िuतीय (cid:26)ांसफाम(र) 15 वदाबी (िव,त ार) 220/66 जीईटीसीओ 50 जून-11 16 नखटराना (िव,त ार) 220/66 जीईटीसीओ 50 जून-11 17 अ>च िलया (िव,त ार) 220/66 जीईटीसीओ 50 जून-11 18 ख,स ा (िव,त ार) 220/66 पीटीसीएल 100 जून-11 19 गुड़गांव से(cid:25)ट र-72 220/33 एचवीपीएनएल 100 जुलाई -11 20 मालेरकोटला (िव,त ार) 220/66 पीटीसीएल 100 जुलाई -11 21 फोकल *व ाइंट नाभा (िuतीय 220/66 पीटीसीएल 100 जुलाई -11 (cid:26)ांसफाम(र) 22 िबठूर 220/132 यूपीपीटीसीएल 160 जुलाई -11 23 िवiन ा 220/132 जे एUड के 320 जुलाई -11 24 कांगािसयाली 220/66 जीईटीसीओ 100 जुलाई -11 25 कोटिमकला (अित(cid:10)र(cid:25)त .) 220/132 सीपीटीसीएल 100 जुलाई -11 26 वसाई (िuतीय (cid:26)ांसफाम(र) 220/100 एमएसईटीसीएल 100 जुलाई -11 27 बे(cid:18)ल मप(cid:18)ल ी (मंडपम) 220/132 एपी (cid:26)ां,क ो 100 जुलाई -11 28 (cid:10)रशरा (िव,त ार) 220/132 ड(cid:2)(cid:4) य ूबीईटीसीएल 160 जुलाई -11 29 लालW 220/66 पीटीसीएल 100 अग,त -11¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 597 30 कपूरथला (कंजली) (नया) 220/66 पीटीसीएल 100 अग,त -11 31 अलगांव 220/66 पीटीसीएल 100 अग,त -11 32 बेमेतारा (अित(cid:10)र(cid:25)त .) 220/132 सीपीटीसीएल 160 अग,त -11 33 िडयोडोर (िव,त ार) 220/66 जीईटीसीओ 50 िसतंबर-11 34 ढासा (िव,त ार) 220/66 जीईटीसीओ 50 िसतंबर-11 35 हदाला (िव,त ार) 220/66 जीईटीसीओ 100 िसतंबर-11 36 जांगरोल (िव,त ार) 220/66 जीईटीसीओ 100 िसतंबर-11 37 वाघोदीद (िव,त ार) 220/66 जीईटीसीओ 100 िसतंबर-11 38 िबठूर (िuतीय (cid:26)ांसफाम(र) 220/132 यूपीपीटीसीएल 160 िसतंबर-11 39 डालखोला 220/132 ड(cid:2)(cid:4) य ूबीईटीसीएल 320 िसतंबर-11 40 पालामनेW 220/132 एपी (cid:26)ां,क ो 100 अ(cid:25)ट ूबर-11 41 छाजपुर सब-,ट ेशन 220/132 एचवीपीएनएल 200 अ(cid:25)ट ूबर-11 42 चोरमर सब-,ट ेशन (.थम 220/132 एचवीपीएनएल 100 अ(cid:25)ट ूबर-11 (cid:26)ांसफाम(र) 43 चोरमर सब-,ट ेशन (िuतीय 220/33 एचवीपीएनएल 100 अ(cid:25)ट ूबर-11 (cid:26)ांसफाम(र) 44 धाWहड़े ा(मऊ) सब-,ट ेशन 220/66 एचवीपीएनएल 200 अ(cid:25)ट ूबर-11 (.थम (cid:26)ांसफाम(र) 45 धाWहड़े ा(मऊ) सब-स् टेशन 220/33 एचवीपीएनएल 100 अ(cid:25)ट ूबर-11 (िuतीय (cid:26)ांसफाम(र) 46 लुआ अिहर 220/33 एचवीपीएनएल 100 अ(cid:25)ट ूबर-11 47 आ,थ ा (अित(cid:10)र(cid:25)त ) (cid:26)ांसफाम(र 220/132 एमपीपीटीसीएल 160 अ(cid:25)ट ूबर-11 सब-,ट ेशन 48 बुतारी(िव,त ार) सब-,ट ेशन 220/66 पीटीसीएल 100 अ(cid:25)ट ूबर-11 49 संचोरे (1x100) 220/132 आरआरवीपी 100 अ(cid:25)ट ूबर-11 एनएल 50 मोसूर-।।। ऑटो (अित(cid:10)र(cid:25)त 220/110 टीएएन(cid:26)ां,क ो 100 अ(cid:25)ट ूबर-11 (cid:26)ांसफाम(र) 51 सदयमप(cid:18)ल म (अित(cid:10)र(cid:25)त 220/33 टीएएन(cid:26)ां,क ो 50 अ(cid:25)ट ूबर-11 (cid:26)ांसफाम(र) 52 कंबलापडु 220/11 एपी (cid:26)ां,क ो 75 नवDब र-11 53 रेगुलापडु सब-,ट ेशन 220/11 एपी (cid:26)ां,क ो 50 नवDब र-11 54 धन\दा 220/132 एचवीपीएनएल 100 नवDब र-11 55 िचकमंगलूर सब-,ट ेशन 220/66 केपीटीसीएल 200 नवDब र-11 56 बदनेरा (िव,त ार) सब-,ट ेशन 220/33 एमएसईटीसीएल 25 7दसDब र-11598 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 57 बालापुर सब-,ट ेशन 220/33 एमएसईटीसीएल 25 7दसDब र-11 58 बDह ौरी (जलगांव) सब-,ट ेशन 220/132 एमएसईटीसीएल 200 7दसDब र-11 59 बDह ौरी सब-,ट ेशन 220/132 एमएसईटीसीएल 25 7दसDब र-11 60 बारामित(िव,त ार) सब-,ट ेशन 220/33 एमएसईटीसीएल 25 7दसDब र-11 61 बारामित(िवसत ् ार) सब- 220/132 एमएसईटीसीएल 50 7दसDब र-11 ,ट ेशन 62 भांडूप जीआईएस सब-,ट ेशन 220/22 एमएसईटीसीएल 200 7दसDब र-11 63 िचकाली (िव,त ार) सब-,ट ेशन 220/132 एमएसईटीसीएल 100 7दसDब र-11 64 हमीदवाड़ा सब-,ट ेशन 220/33 एमएसईटीसीएल 50 7दसDब र-11 65 Gहजेवाड़ी सब-,ट ेशन 220/22 एमएसईटीसीएल 50 7दसDब र-11 66 आईएमटी (मानेसर) (िव,त ार) 220/66 एचवीपीएनएल 100 7दसDब र-11 67 जाथ सब-,ट ेशन 220/33 एमएसईटीसीएल 50 7दसDब र-11 68 कदगे ांव सब-,ट ेशन 220/132 एमएसईटीसीएल 100 7दसDब र-11 69 कदगे ांव सब-,ट ेशन 220/33 एमएसईटीसीएल 100 7दसDब र-11 70 कंदलगांव सब-,ट ेशन 220/22 एमएसईटीसीएल 50 7दसDब र-11 71 कंगािसयाली (िuतीय 220/66 जीईटीसीओ 100 7दसDब र-11 (cid:26)ांसफाम(र) 72 कृJण िगरी 220/11 एपी (cid:26)ां,क ो 75 7दसDब र-11 73 कुरकुंभ सब-,ट ेशन 220/132 एमएसईटीसीएल 200 7दसDब र-11 74 ल(cid:25)क ासगरम 220/11 एपी (cid:26)ां,क ो 75 7दसDब र-11 75 ललपर 220/132 जीईटीसीओ 200 7दसDब र-11 76 एम के aबली (िuतीय 220/110 केपीटीसीएल 100 7दसDब र-11 (cid:26)ांसफाम(र) 77 िमराज (िव,त ार) सब-,ट ेशन 220/132 एमएसईटीसीएल 100 7दसDब र-11 78 िनवाली सब-,ट ेशन 220/132 एमएसईटीसीएल 100 7दसDब र-11 79 पारादीप (िव,त ार) सब-,ट ेशन 220/132 ओपीटीसीएल 110 7दसDब र-11 80 परभानी (िव,त ार) सब-,ट ेशन 220/132 एमएसईटीसीएल 100 7दसDब र-11 81 पुसाद (िव,त ार) सब-,ट ेशन 220/33 एमएसईटीसीएल 25 7दसDब र-11 82 सवांगी सब-,ट ेशन 220/132 एमएसईटीसीएल 100 7दसDब र-11 83 सेKीप(cid:18)ल ी 220/11 एपी (cid:10)ां(cid:13) को 75 7दसDब र-11 84 सोलापुर (िव,त ार) सब-,ट ेशन 220/132 एमएसईटीसीएल 50 7दसDब र-11 85 तुलजापुर सब-,ट ेशन 220/33 एमएसईटीसीएल 100 7दसDब र-11 86 वीएसएनएल – येवालेवाड़ी 220/22 एमएसईटीसीएल 50 7दसDब र-11 सब-,ट ेशन¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 599 87 वरोरा (िव,त ार) (िuतीय) 220/33 एमएसईटीसीएल 25 7दसDब र-11 सब-,ट ेशन 88 वरोरा(िव,त ार) सब-,ट ेशन 220/33 एमएसईटीसीएल 25 7दसDब र-11 89 अमरगढ़ सब-,ट ेशन/ 220/132 जेकेपीडीडी 160 जनवरी-12 90 अमृतसर सब-,ट ेशन 220/66 पीटीसीएल 100 जनवरी-12 91 औरंगाबाद Hरग मेन 220/33 एमएसईटीसीएल 100 जनवरी-12 92 बालापुर (िuतीय (cid:26)ांसफाम(र) 220/33 एमएसईटीसीएल 25 जनवरी-12 93 बालापुर सब-,ट ेशन 220/132 एमएसईटीसीएल 200 जनवरी-12 94 बKा सब-,ट ेशन(.थम 220/132 एचवीपीएनएल 100 जनवरी-12 (cid:26)ांसफाम(र) 95 बKा सब-,ट ेशन (िuतीय 220/33 एचवीपीएनएल 100 जनवरी-12 (cid:26)ांसफाम(र) 96 भू(cid:10)टया (िव,त ार) 220/66 जीईटीसीओ 50 जनवरी-12 97 िबदरी (25 एमवीए) 220/33 एमएसईटीसीएल 50 जनवरी-12 98 िबदरी सब-,ट ेशन 220/132 एमएसईटीसीएल 100 जनवरी-12 99 बोगाइगांव टीपीएस सब 220/132 एईजीसीएल 80 जनवरी-12 ,ट ेशन (िव,त ार) 100 बुडगांव 220/132 जेकेपीडीडी 320 जनवरी-12 101 चं4पुरा (िव,त ार) 220/66 जीईटीसीओ 50 जनवरी-12 102 डसुया ( अित(cid:10)र(cid:25)त (cid:26)ांसफाम(र) 220/66 पीटीसीएल 100 जनवरी-12 सब-,ट ेशन 103 धुरी (अित(cid:10)र(cid:25)त )(तृतीय 220/66 पीटीसीएल 100 जनवरी-12 (cid:26)ांसफाम(र) सब-,ट ेशन 104 7फरोजपुर रोड लुिधयाना 220/66 पीटीसीएल 100 जनवरी-12 (1x100 एमवीए) 105 गोरखपुर िuतीय (िuतीय 220/132 यूपीपीटीसीएल 160 जनवरी-12 (cid:26)ांसफाम(र) 106 मaआखेड़ागंज 220/132 पीटीसीयूएल 200 जनवरी-12 107 मंडी गोGवदगढ़ 220/66 पीटीसीएल 100 जनवरी-12 108 मीरबाजार 220/132 जेकेपीडीडी 320 जनवरी-12 109 नैनसरु ाला 220/11 एपी (cid:26)ां,क ो 75 जनवरी-12 110 नुिहयावली 220/132 एचवीपीएनएल 100 जनवरी-12 111 नुनामाजरा (िव,त ार) सब 220/132 एचवीपीएनएल 100 जनवरी-12 ,ट ेशन600 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 112 पे(cid:26)न 220/66 पीटीसीएल 100 जनवरी-12 113 रामबन (3x40) 220/132 जेकेपीडीडी 120 जनवरी-12 114 रोहतक (िव,त ार) सब-,ट ेशन 220/132 एचवीपीएनएल 100 जनवरी-12 115 सगापारा(िव,त ार) 220/66 जीईटीसीओ 50 जनवरी-12 116 (cid:26)ामा स(cid:19)टर/एDस (जीआईएस) 220/33 डीटीएल 200 जनवरी-12 117 ए-5 फरीदाबाद सब-,ट ेशन 220/66 एचवीपीएनएल 100 फरवरी-12 118 दीपालपुर सब-,ट ेशन 220/132 एचवीपीएनएल 200 फरवरी-12 119 कबुलपुर सब-,ट ेशन 220/132 एचवीपीएनएल 200 फरवरी-12 120 मसुदपुर 220/132 एचवीपीएनएल 100 फरवरी-12 121 मोहना 220/132 एचवीपीएनएल 100 फरवरी-12 122 बारशी सब-,ट ेशन 220/132 एमएसईटीसीएल 200 फरवरी-12 123 Bलैगशीप (Gहजेबाड़ी) सब- 220/22 एमएसईटीसीएल 50 फरवरी-12 ,ट ेशन 124 तुलजापुर सब-,ट ेशन 220/132 एमएसईटीसीएल 200 फरवरी-12 125 छोला साहबे सब-,ट ेशन 220/66 पीटीसीएल 100 फरवरी-12 126 दोराहा 220/66 पीटीसीएल 100 फरवरी-12 127 कोटला जंगण (अित(cid:10)र(cid:25)त ) 220/66 पीटीसीएल 100 फरवरी-12 128 रेहाना जKन 220/66 पीटीसीएल 100 फरवरी-12 129 7कशनगढ़बास सब-,ट ेशन 220/132 आरवीपीएनएल 100 फरवरी-12 130 (दीघी) येवालेवाड़ी सब-,ट ेशन 220/22 एमएसईटीसीएल 50 माच(-12 131 भोकध(न 220/33 एमएसईटीसीएल 50 माच(-12 132 भोकध(न सब-,ट ेशन 220/132 एमएसईटीसीएल 200 माच(-12 133 गजोखर 220/132 यूपीपीटीसीएल 100 माच(-12 134 िहDम तपुरा (अित(cid:10)र(cid:25)त 100 220/66 पीटीसीएल 100 माच(-12 एमवीए (cid:26)ांसफाम(र) 135 झांसी 220/132 यूपीपीटीसीएल 100 माच(-12 136 झुनसी 220/132 यूपीपीटीसीएल 160 माच(-12 137 जुराला 220/132 एपी (cid:26)ां,क ो 200 माच(-12 138 कागल (हमीदवाड़ा) सब- 220/33 एमएसईटीसीएल 50 माच(-12 ,ट ेशन 139 म,त (cid:19)वाला 220/66 पीटीसीएल 100 माच(-12 140 मेहलकलन 220/66 पीटीसीएल 100 माच(-12 141 परंदा 220/132 एमएसईटीसीएल 200 माच(-12 142 पटोदा 220/33 एमएसईटीसीएल 100 माच(-12¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 601 143 रिसयाना (अित(cid:10)र(cid:25)त ) 220/66 पीटीसीएल 100 माच(-12 144 सोमनह(cid:18)ल ी (अित(cid:10)र(cid:25)त ) 220/66 केपीटीसीएल 100 माच(-12 145 तदाली सब-,ट ेशन 220/33 एमएसईटीसीएल 100 माच(-12 146 तेलकाडीह सब-,ट ेशन 220/132 सीपीटीसीएल 160 माच(-12 147 वडाला (अित(cid:10)र(cid:25)त ) 220/66 पीटीसीएल 100 माच(-12 ककककुुुुलललल ((((रररराााा""""यय यय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे )))) 222222220000 11115555888833335555 िनजी 8े9 1 छौर सब-,ट ेशन 220/132 ईपीसीएल 127 िसतंबर-11 ककककुुुुलललल 222222220000 ककककेेेेववववीीीी((((अअअअििििखखखखलललल भभभभााााररररतततत )))) 11116666666622222222 ककककुुुुलललल अअअअििििखखखखलललल भभभभााााररररतततत ((((777766665555++++444400000000++++222222220000 ककककेेेेववववीीीी)))) 55554444222288887777602 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] अअअअननननबबुुबबुु धधंंधधंं -6666....6666 िनमा(णाधीन पारेषण लाईन प(cid:10)रयोजनाए ं (220 केवी और उससे अिधक) के िववरण जहां काया(3व यन एज(cid:19)िसय^ uारा वन ,व ीकृित संबंधी बड़ी सम,य ाए ं बतायी गयी ह g । ) प(cid:10)रयोजना का नाम/अवि,थित 7)या3व यन एमओईएफ/रा2य सरकार के साथ मुo^ कV स. एज(cid:19)िसया ं संि8*त जानकारी 1. पाव(ती पुGलग ,ट ेशन-अमृतसर पीजीसीआईएल कुल वन भूिम 137.213 ह(cid:25)े टेयर। .,ताव डी/सी लाइन (िहमाचल .दशे ) जून 2010 म(cid:19) पा(cid:10)रत aआ।आरएमओईएफ ने िनरी8ण (cid:10)रपोट( माच( 2012 म(cid:19) स\पी तथा एफएसी मीHटग म(cid:19) अ.ैल 2012 म(cid:19) चचा ( कV। एफआरए अनुपालन .गित पर ह।ै चरण। कV ,वीकृित .ाr कV जानी ह।ै 2. अनपारा बी से अनपारा सी यूपीपीटीसीएल कुल वन भूिम 6.7 ह(cid:25)े टेयर (800 मीटर) ि,वचयाड ( पर टtमनेशन *वाइंट से .,ताव अग,त 2010 म(cid:19) पा(cid:10)रत aआ। चरण। अनपारा-उ›ाव 765 केवी एस/सी कV ,वीकृित मई 2011 म(cid:19) .ाr aई पारेषण लाइन कV िशGBटग चरण ॥ कV ,वीकृित 7दसंबर 2011 म(cid:19) .ाr aई। लाइन माच( 2012 म(cid:19) शुW aई। 3. केपीटीसीएल कुल वन भूिम 172.53 ह(cid:25)े टेयर (33.39 यूपीसीएल नांदीकुर- हसन 7कलोमीटर) .,ताव माच( 2010 म(cid:19) पा(cid:10)रत (शांितSाम) 400 केवी डी/सी लाइन aआ। चरण । कV ,वीकृित फरवरी 2011 म(cid:19) .ाr aई चरण ॥ कV ,वीकृित फरवरी 2012 म(cid:19) .ाr aई और काय ( .गित पर ह।ै 4. बीटीपीएस-िहरीयरु 400 केवी केपीटीसीएल कुल वन भूिम 14.34 ह(cid:25)े टेयर .,ताव मई लाइन 2008 म(cid:19) पा(cid:10)रत aआ। वन िवभाग ने जुलाई 2010 म(cid:19) .,ताव अSेिषत 7कया क(cid:19)4क अिधकारी ने एमओईएफ को जनवरी 2011 म(cid:19) स\पी चरण । कV ,वीकृित मई 2011 म(cid:19) .ाr aई चरण ॥ कV ,वीकृित जनवरी 2012 म(cid:19) .ाr aई। लाइन माच( 2012 म(cid:19) शुW aई। 5. कोलडम-लुिधयाना 400केवी लाइन पीकेटीसीएल पीजीसीआईएल न े वन .,ताव मई 05 म(cid:19) (िह. और पंजाब) स\पी। िहमाचल .दशे का भाग चरण। कV ,वीकृित माच( 2010 म(cid:19) .ाr aई पंजाब का भाग चरण। कV ,वीकृित फरवरी 2010 म(cid:19) .ाr¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 603 aई। पीकेटीसीएल न े .यो‚ा एज(cid:19)सी का नाम प(cid:10)रवtतत करन े का अनुरोध 7कया । क(cid:19)4क अिधकारी,िहमाचल .दशे ने जुलाई 2010 म(cid:19) एमओईएफ को मामले कV स,ं तुित कV। मामला एमओईएफ के िवचाराधीन ह।ै चरण ॥ अभी .ाr कV जानी ह।ै 6. ती,ता- III-मंगन-7कशनगंज टीवीपीटीएल कुल वन भूिम (करं7दघी) 400 केवी डी/सी 48.4484(िस7œम)+47.4932(पिZम लाइन((cid:141)ैद मूज) बंगाल) वन .,ताव अग,त 2009 म(cid:19) स\पा गया। िस7œम के िलए चरण। कV ,वीकृित जनवरी 2011 म(cid:19) .ाr aई अनुपालन मसौदा मई 2011 म(cid:19) स\पा गया। चरण॥ कV ,वीकृित िसतंबर 2011 म(cid:19) .ाr aई। पिZम बंगाल के िलए वन .,ताव अग,त 2009 म(cid:19) स\पा गया।चरण। कV ,वीकृित अभी .ाr कV जानी ह।ै रा2य सरकार को अभी एमओईएफ को .,ताव अSेिषत करनी ह।ै 7. मुं4ा –Gलबडी और मुं4ा-जेतपर पीजीसीआईएल कुल वन भूिम (44.34 + 29.38 ह(cid:25)े टेयर) मुं4ा-रणछोड़पुरा 400 केवी डी/सी चरण। कV ,वीकृित अ‚ूबर2010/जून लाइन 2011म(cid:19) .ाr aई।वन .,ताव जनवरी 2011 म(cid:19) स\पा गया। चरण।। कV ,वीकृित जून/जुलाई 2011 म(cid:19) .ाr aई। अनुपालन मसौदा मई 2011 म(cid:19) स\पा गया। चरण॥ कV ,वीकृित िसतंबर 2011 म(cid:19) .ाr aई। मुं4ा –Gलबडी और मुं4ा-रणछोड़पुरा लाइन फरवरी 2012 म(cid:19) शुW aई। मुं4ा- जेतपर लाइन .गित पर ह।ै 8. Gहदपुर-पुिलव(cid:19)दलु ा 220 केवी डी/सी एपी(cid:26)ांसको कुल वन भूिम 6.79 ह(cid:25)े टेयर चरण। वन लाइन .,ताव अ.ैल 2008 म(cid:19) स\पा गया। चरण। कV ,वीकृित जुलाई 2008 म(cid:19) .ाr aई। अनुपालन मसौदा जुलाई 2009 म(cid:19) स\पा गया। चरण॥ कV ,वीकृित .तीि8त ह।ै 9. ने(cid:18)लोर-पालमनेW 220 केवी डी/सी एपी(cid:26)ांसको यह लाइन छोड़ दी गयी ह।ै लाइन604 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 10. प(cid:18)लाताना-ब^गाइगांव 400 केवी एनईटीसीएल कुल वन भूिम (5680 ह(cid:25)े टेयर) 130 डी/सी लाइन एलओसी म(cid:19)। वन .,ताव अ.ैल स े अग,त 2006 म(cid:19) स\पे गए। िििि3333पपपपररुुररुु ाााा चरण। कV ,वीकृित अ‚ूबर 2009 म(cid:19) .ाr कV गई। चरण॥ कV ,वीकृित अग,त 2010 म(cid:19) .ाr कV गई। अअअअससससमममम चरण। कV ,वीकृित मई 2010 म(cid:19) .ाr कV गई। अनुपालन मसौदा फरवरी 2011 म(cid:19) स\पा गया। चरण॥ कV ,वीकृित मई 2012 म(cid:19) .ाr कV गई। ममममघघेेघघेे ााााललललयययय चरण। कV ,वीकृित फरवरी 2010 म(cid:19) .ाr कV गई।अनुपालन मसौदा फरवरी 2011 म(cid:19) स\पा गया। चरण॥ कV ,वीकृित मई 2012 म(cid:19) .ाr कV गई। 11. काम(cid:19)ग-बािलपारा 400 केवी डीसी पीजीसीआईएल कुल वन भूिम (98.25 ह(cid:25)े टेयर) चरण । कV लाइन (असम) ,वीकृित जनवरी 2010 म(cid:19) .ाr कV गई। अनुपालन मसौदा जुलाई 2011 म(cid:19) स\पा गया। चरण॥ कV ,वीकृित अभी .ाr होनी ह।ै 12. िव(cid:157)नाथ च(cid:10)रयाली पुGलग ,टेशन के पीजीसीआईएल कुल वन भूिम 58.55 ह(cid:25)े टेयर चरण । कV िलए अथ( इले(cid:25)(cid:26)ोड लाइन और ,वीकृित नबंबर 2009 म(cid:19) .ाr कV गई। ठिगयाबा(cid:10)र (असम) पर अथ( अनुपालन मसौदा जुलाई 2011 म(cid:19) स\पा इले(cid:25)(cid:26)ोड ,टेशन गया। चरण ॥ कV ,वीकृित अभी .ाr होनी ह।ै 13. कोरबा एसटीपीपी-िRGसहपुर 400 पीजीसीआईएल कुल वन भूिम 157.481 ह(cid:25)े टेयर केवी डी/सी लाइन (छ`ीसगढ़) चरण। कV ,वीकृित जुलाई 2010 म(cid:19) .ाr कV गई। अनुपालन मसौदा नबंबर 2010 म(cid:19) स\पा गया। चरण॥ कV ,वीकृित जून 2011 म(cid:19) .ाr कV गई। लाइन फरवरी 2012 म(cid:19) शुW aई।¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 605 14. िबहारशरीफ-कोडरमा 400केवी पीजीसीआईएल कुल वन भूिम 13.007 ह(cid:25)े टेयर चरण। कV डी/सी लाइन (िबहार) ,वीकृित अ.ैल 2010 म(cid:19) .ाr कV गई। अनुपालन मसौदा 7दसंबर 2010 म(cid:19) स\पा गया। चरण ॥ कV ,वीकृित माच( 2011 म(cid:19) .ाr कV गई। लाइन माच( 2011 म(cid:19) शुW aई। 15. मैसूर-कोिजकोड 400 केवी डी/सी पीजीसीआईएल कुल वन भूिम 23.166 ह(cid:25)े टेयर, वन .,ताव लाइन 23.166 ह(cid:25)े टेयर (कना(टक) अ.ैल 2004 म(cid:19) स\पा गया।रा2य सरकार न े अ‚ूबर 2010 म(cid:19) .,ताव पा(cid:10)रत 7कया। चरण। कV ,वीकृित .ाr होनी ह।ै 16. मोGहदरगढ़ एचवीडीसी ,टेशन पीजीसीआईएल कुल वन भूिम 0.8612 ह(cid:25)े टेयर ,टेशन माच( (ह(cid:10)रयाणा) 2012 म(cid:19) शुW aआ। 17. राउरकेला-रायगढ़ 400 केवी डी/सी अदानी पावर कुल वन भूिम 111.39 ह(cid:25)े टेयर। चरण । कV लाइन (उड़ीसा) ,वीकृित अ‚ूबर 2009 म(cid:19) .ाr कV गई। चरण॥ कV ,वीकृित अभी .ाr कV जानी ह।ै जुलाई 2010 म(cid:19) एमओईएफ कV िवशेष अनुमित पर जून 2011 म(cid:19) लाइन शुW aई। 18. चमेरा-III पुGलग ,टेशन- जालंधर पीजीसीआईएल कुल वन भूिम 130.698 ह(cid:25)े टेयर, चरण । 400केवी डी/सी लाइन (िहमाचल कV ,वीकृित िसतंबर 2010 म(cid:19) .ाr कV गई। .दशे ) अनुपालन मसौदा माच( 2011 म(cid:19) स\पा गया। चरण ॥ कV ,वीकृित अभी .ाr होनी ह।ै 19. लोअर सुबांिसरी-िव(cid:157)नाथ पीजीसीआईएल कुल वन भूिम 88.77 ह(cid:25)े टेयर, चरण। वन च(cid:10)रयाली 400केवी डी/सी लाइन .,ताव फरवरी 2011 म(cid:19) स\पा गया। चरण। (असम) कV ,वीकृित अभी .ाr होनी ह।ै 20. काम(cid:19)ग-बािलपारा 400 केवी डी/सी पीजीसीआईएल कुल वन भूिम 133.65 ह(cid:25)े टेयर, चरण । कV लाइन (अWणाचल .दशे ,वीकृित िसतंबर 2010 म(cid:19) .ाr कV गई। अनुपालन मसौदा अ‚ूबर 2011 म(cid:19) स\पा गया। काय( .गित पर ह।ै 21. रायपुर-वधा( 400केवी डी/सी लाइन पीजीसीआईएल कुल वन भूिम 15.37 ह(cid:25)े टेयर, (छ`ीसगढ) वन .,ताव मई 2011 म(cid:19) स\पा गया। चरण।कV ,वीकृित अ.ैल 2012 म(cid:19) .ाr कV गई। काय( .गित पर ह।ै606 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 22. कृJणपKणम-गूटी और कृJणपKणम- पीजीसीआईएल कुल वन भूिम 42.067 ह(cid:25)े टेयर, कुनु(ल 400 केवी डी/सी लाइन (आं- वन .,ताव नबंबर 2010 म(cid:19) स\पा गया। .दशे ) चरण। कV ,वीकृित 7दसंबर 2010 म(cid:19) .ाr कV गई। अनुपालन मसौदा फरवरी 2012 म(cid:19) स\पा गया। चरण ॥ कV ,वीकृित अभी .ाr होनी ह।ै 23. धनबाद-िगरीडीह 220 केवी डी/सी डीवीसी कुल वन भूिम 42.243 ह(cid:25)े टेयर, लाइन वन .,ताव िसतंबर 2006 म(cid:19) स\पा गया। चरण। कV ,वीकृित जनवरी 2009 म(cid:19) .ाr कV गई। अनुपालन मसौदा अग,त 2011 म(cid:19) स\पा गया। चरण ॥ कV ,वीकृित मई 2012 म(cid:19) .ाr कV गई। काय( कV ,वीकृित अभी वन िवभाग से .ाr होनी ह।ै 24. मेिजया-गोला-रामगढ़ 220केवी डीवीसी कुल वन भूिम 90.543 ह(cid:25)े टेयर, लाइन वन .,ताव नबंबर 2005 म(cid:19) स\पा गया। चरण। कV ,वीकृित अ.ैल 2010 म(cid:19) .ाr कV गई। अनुपालन मसौदा अग,त 2010 म(cid:19) स\पा गया। चरण ॥ कV ,वीकृित अभी .ाr होनी ह।ै 25. रघुनाथपुर-रांची 400 केवी लाइन डीवीसी कुल वन भूिम 61.352 ह(cid:25)े टेयर, वन .,ताव जनवरी 2008 म(cid:19) स\पा गया। चरण। कV ,वीकृित अ‚ूबर 2010 म(cid:19) .ाr कV गई। अनुपालन मसौदा 7दसंबर 2011 म(cid:19) स\पा गया। चरण ॥ कV ,वीकृित अभी .ाr होनी ह।ै 26. गोला-रांची 220केवी डी/सी लाइन डीवीसी कुल वन भूिम 42.164 ह(cid:25)े टेयर, वन .,ताव मई 2008 म(cid:19) स\पा गया। चरण। कV ,वीकृ ित नबंबर 2010 म(cid:19) .ाr कV गई। अनुपालन मसौदा अभी स\पी जानी ह।ै 27. संपला-मोहना 220 केवी डी/सी एचवीपीएनएल कुल वन भूिम 0.4919 ह(cid:25)े टेयर, लाइन लाइन फरवरी 2011 म(cid:19) शुW aई। 28. उतरन-कोसांबा 220 केवी लाइन-॥ जीईटीसीओ यह लाइन छोड़ दी गयी ह।ै 29. मालवा-टीएचपी िपतमपुर 400 एमपीपीटीसीएल कुल वन भूिम 5.755 7कलोमीटर केवी डी/सी लाइन वन .,ताव फरवरी 2010 म(cid:19) स\पा गया।¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 607 चरण। कV ,वीकृित 7दसंबर 2010 म(cid:19) .ाr कV गई। अनुपालन मसौदा अग,त 2011 म(cid:19) स\पा गया। चरण ॥ कV ,वीकृित फरवरी 2012 म(cid:19) .ाr कV गई। 30. पालामनेW-िच`ूर 220 केवी डी/सी एपी (cid:26)ां,क ो कुल वन भूिम 22.03 ह(cid:25)े टेयर, लाइन वन .,ताव अग,त 2006 म(cid:19) स\पा गया। चरण। कV ,वीकृित जुलाई 2010 म(cid:19) .ाr कV गई। अनुपालन मसौदा 7दसंबर 2010 म(cid:19) स\पा गया। चरण ॥ कV ,वीकृित जनवरी 2011 म(cid:19) .ाr aई। लाइन अ‚ूबर 2011 म(cid:19) शुW aई। 31. पाव(ती-कोलडम 400 केवी लाइन पीकेटीसीएल वन .,ताव नबंबर 2006 म(cid:19) स\पा गया। (िहमाचल .दशे ) चरण। कV ,वीकृित 7दसंबर 2007 म(cid:19) .ाr कV गई। अनुपालन मसौदा रा2य सरकार के पास लंिबत ह।ै 32. वापी-नवी मुंबई 400केवी डी/सी पीजीसीआईएल कुल वन भूिम 272.1195 ह(cid:25)े टेयर, लाइन, (महाराž) वन .,ताव मई 2005 म(cid:19) स\पा गया। वन .,ताव अ(cid:25)टूबर 2011 म(cid:19) नेशनल बोड ( फॉर वाइ(cid:18)ड लाईफ (एनबीड(cid:4)(cid:18)यूएल) को .,तुत कV गई। 33. ब(cid:10)रपदा-म(cid:19)ढासल 400केवी डी/सी पीजीसीआईएल कुल वन भूिम 21.36 ह(cid:25)े टेयर (0.55 लाइन (उड़ीसा) ह(cid:25)े टेयर ड(cid:4)(cid:18)यूएल),वन .,ताव फरवरी 2008 म(cid:19) स\पा गया। चरण। कV ,वीकृित मई 2011 म(cid:19) .ाr कV गई। अनुपालन मसौदा अग,त 2011 म(cid:19) स\पा गया। चरण॥ कV ,वीकृित अग,त 2011 म(cid:19) .ाr कV गई। लाइन अग,त 2011 म(cid:19) शुW aई। 34. कोडरमा-िगरीडीह 220 केवी लाइन डीवीसी कुल वन भूिम 86.085 ह(cid:25)े टेयर, वन .,ताव माच( 2009 म(cid:19) स\पा गया। माच( 2012 म(cid:19) कोई भी .,ताव अSेिषत नहd 7कया गया। चरण। कV ,वीकृित मई 2012 म(cid:19) .ाr कV गई। अनुपालन मसौदा अभी स\पी जानी ह।ै608 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 35. झालावाड़-कािलGसध 220 केवी आरआरवीपीएनएल कुल वन भूिम 4.4 ह(cid:25)े टेयर, वन .,ताव माच( डी/सी लाइन 2010 म(cid:19) स\पा गया। चरण। कV ,वीकृित अ.ैल 2011 म(cid:19) .ाr कV गई। लाइन अ.ैल 2012 म(cid:19) शुW aई। 36. मादरी-उदयपुर 220केवी लाइन का आरआरवीपीएनएल कुल वन भूिम 2.1 ह(cid:25)े टेयर, वन .,ताव मई एलआईएलओ 2010 म(cid:19) स\पा गया। चरण। कV ,वीकृित अभी .ाr होनी ह।ै 37. रंजीत सागर डमै -सरना (स6कट IV) पीटीसीएल यह लाइन छोड़ दी गयी ह।ै 220 केवी लाइन 38. लोहा(cid:10)रनागपाला-कोटे(cid:157)र 400 पीटीसीयूएल यह लाइन छोड़ दी गयी ह।ै केवी डी/सी लाइन 39. सतपुरा-आ,था डी/सी 400 केवी एमपीपीटीसीएल कुल वन भूिम 106.15 ह(cid:25)े टेयर, वन .,ताव लाइन 7दसंबर 2010 म(cid:19) स\पा गया। चरण। कV ,वीकृित जनवरी 2012 म(cid:19) .ाr कV गई। अनुपालन मसौदा अभी स\पी जानी ह।ै 40. वाणी-वरोरा 220केवी लाइ एमएसईटीसीएल यह लाइन छोड़ दी गयी ह।ै 41. चं4पुर॥–एमआईडीसी-ब(cid:18)लरशाह एमएसईटीसीएल यह लाइन छोड़ दी गयी ह।ै 220केवी डी/सी लाइन 42. मौजूदा ि,थित से खापरखेड़ा एमएसईटीसीएल कुल वन भूिम 0.7735 ह(cid:25)े टेयर, कोराडी का न.ं 6- चं4पुर 400केवी चरण। कV ,वीकृित जनवरी 2012 म(cid:19) .ाr एस/सी लाइन कV गई। चरण ॥ कV ,वीकृित अभी .ाr कV जानी ह।ै 43. जेउर-परांदा 220केवी डी/सी लाइन एमएसईटीसीएल यह लाइन छोड़ दी गयी ह।ै 44. पारेषण लाइन लंबोटी (सोलापुर) – एमएसईटीसीएल कुल वन भूिम 63.24 ह(cid:25)े टेयर, वन .,ताव तलजापुर 220केवी डी/सी लाइन नबंबर 2009 म(cid:19) स\पा गया। चरण। कV ,वीकृित अभी .ाr कV जानी ह।ै 45. पालC ॥।-नांदड़े 220 केवी डी/सी एमएसईटीसीएल यह लाइन छोड़ दी गयी ह।ै लाइन 46. राजगढ़ (पीजी)- कम(साद (गेटको) आरपीटीएल कुल वन भूिम 39.14 ह(cid:25)े टेयर, वन .,ताव 400 केवी डी/सी लाइन 7दसंबर 2009 म(cid:19) स\पा गया। रा2य सरकार को एमओईएफ को अभी .,ताव अSेिषत करना ह।ै¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 609 47. बोईसर म(cid:19) तारापुर-बोरीबली 220 एमएसईटीसीएल कुल वन भूिम 0.498 ह(cid:25)े टेयर, वन .,ताव केवी डी/सी का एलआईएलओ अग,त 2008 म(cid:19) स\पा गया। चरण । कV ,वीकृित अभी .ाr कV जानी ह।ै 48. बोईसर-बोरीबल 220केवी डी/सी एमएसईटीसीएल कुल वन भूिम 198.71(117.29+81.42) ह(cid:25)े टेयर,वन .,ताव अग,त 2010 म(cid:19) स\पा गया। चरण । कV ,वीकृित 7दसंबर 2011 म(cid:19) .ाr कV गई। अनुपालन मसौदा जुलाई 2012 म(cid:19) स\पा गया। चरण ॥ कV ,वीकृित अभी .ाr कV जानी ह।ै 49. बोरीबल-कलवा 220 केवी डी/सी एमटीसीएल -do- लाइन 50. कालवा-खागघर 220केवी डी/सी एमटीसीएल -do- लाइन 51. सांिविधक ,वीकृित जारी रखने के केईबी वन .,ताव जुलाई 2010 म(cid:19) स\पा गया। िलए 50 और 51 लोकेशन पर 220 चरण। कV ,वीकृित अभी .ाr कV जानी ह।ै केवी सवा(cid:10)रिगरी-थेनी फVडर स े पहले 52. मनकुलम एचईपी-वलारा पुGलग केईबी वन .,ताव अग,त 2010 म(cid:19) स\पा गया। ,टेशन 220 केवी लाइन चरण। कV ,वीकृित अभी .ाr कV जानी ह।ै 53. लोहरदPगा-लातेहार 220 केवी जेईबी कुल वन भूिम 11.5611 ह(cid:25)े टेयर, वन डी/सी लाइन .,ताव जुलाई 2010 म(cid:19) स\पा गया। चरण। कV ,वीकृित अभी .ाr कV जानी ह।ै 54. लातेहार-डा(cid:18)टनगंज 220केवी जेईबी कुल वन भूिम 57.04 ह(cid:25)े टेयर, वन .,ताव डी/सी लाइन अग,त 2010 म(cid:19) स\पा गया। चरण। कV ,वीकृित अभी .ाr कV जानी ह।ै 55. ितरोदा-वरोरा (एमएसईटीसीएल) अदानी पावर कुल वन भूिम 27.308 ह(cid:25)े टेयर,वन .,ताव 400 केवी डी/सी ((cid:141)ैद) लाइन मई 2011 म(cid:19) स\पा गया। चरण। कV ,वीकृित जनवरी 2012 म(cid:19) .ाr कV गई। अनुपालन मसौदा फरवरी 2012 म(cid:19) स\पा गया। चरण ॥ कV ,वीकृित अभी .ाr कV जानी ह।ै 56. मुं4ा-मह3े 4गढ़ केवी±500 अदानी पावर कुल वन भूिम 55.58 ह(cid:25)े टेयर,वन .,ताव एचवीडीसी लाइन मई 2011 म(cid:19) स\पा गया। चरण। कV610 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ,वीकृित अ‚ूबर 2011 म(cid:19) .ाr कV गई। लाइन माच ( 2012 म(cid:19) पूरी aई। 57. कोरबा-िब†ामपुर 220केवी डी/सी सीपीटीसीएल कुल वन भूिम 195.296 ह(cid:25)े टेयर, वन .,ताव जुलाई 2006 म(cid:19) स\पा गया। चरण। कV ,वीकृित माच( 2009 म(cid:19) .ाr कV गई। अनुपालन मसौदा मई 2011 म(cid:19) स\पा गया। चरण ॥ कV ,वीकृित अग,त 2011 म(cid:19) .ाr कV गई। 58. ब^गाइगांव (पीजी)-िसलीगुड़ी ईएनआईसीएल कुल वन भूिम 8.5 ह(cid:25)े टेयर,वन .,ताव (पीजी) 400केवी डी/सी लाइन जनवरी 2011 म(cid:19) स\पा गया। चरण। कV ,वीकृित अभी .ाr कV जानी ह।ै 59. िबलासपुर पुGलग ,टेशन- राचं ी पीजीसीआईएल कुल वन भूिम 302.368 ह(cid:25)े टेयर,वन 765केवी एस/सी लाइन (छ`ीसगढ़) .,ताव माच( 2011 म(cid:19) स\पा गया। चरण। कV ,वीकृित अभी .ाr कV जानी ह।ै 60. िसलचर-मेल(cid:10)रअत(3यू) 400 केवी पीजीसीआईएल कुल वन भूिम 375.66 ह(cid:25)े टेयर,वन .,ताव डी/सी लाइन (132 केवी पर िसतंबर 2011 म(cid:19) स\पा गया। चरण। कV आवेिशत) ,वीकृित अभी .ाr कV जानी ह।ै 61. सासन-सतना 765 केवी एस/सी पीजीसीआईएल कुल वन भूिम 114.724 ह(cid:25)े टेयर,वन लाइन (स6कट ।) (मcय .दशे ) .,ताव मई 2011 म(cid:19) स\पा गया। चरण । कV ,वीकृित अभी .ाr कV जानी ह।ै 62. पाव(ती पुGलग ,टेशन-अमृतसर पीजीसीआईएल कुल वन भूिम 61.65 ह(cid:25)े टेयर, चरण । कV लाइन 400केवी डी/सी (पंजाब) ,वीकृित अ.ैल 2010 म(cid:19) .ाr कV गई। वन .,ताव अ‚ूबर 2011 म(cid:19) स\पा गया।चरण ।। कV ,वीकृित अभी .ाr कV जानी ह।ै 63. बोकारो-कोडरमा 400केवी डी/सी पीजीसीआईएल कुल वन भूिम 198.59 ह(cid:25)े टेयर,वन .,ताव लाइन (झारखंड) मई 2011 म(cid:19) स\पा गया। चरण। कV ,वीकृित अभी .ाr कV जानी ह।ै 64. सतपुरा (सारनी)-पंढुरना 220केवी एमपीपीटीसीएल कुल वन भूिम 38.90 ह(cid:25)े टेयर, वन .,ताव लाइन (िuतीय स6कट) फरवरी 2011 म(cid:19) स\पा गया। चरण। कV ,वीकृित िसतंबर 2011 म(cid:19) .ाr कV गई। अनुपालन मसौदा माच( 2012 म(cid:19) स\पा गया। चरण ॥ कV ,वीकृित जून 2012 म(cid:19) .ाr कV गई।¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 611 अअअअननननबबुुबबुु धधंंधधंं ---- 6666....7777 11111111ववववEEEE ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन VVVV>>>>ययययााााििंंििंं ववववतततत कककक.... जजजजाााा ररररहहहहीीीी ययययोोोोजजजजननननााााएएएए ंं ंं ((((उउउउDDDDपपपपााााददददनननन पपपप((((ररररययययोोोोजजजजननननााााएएएए ंं ंंऔऔऔऔरररर आआआआईईईईएएएएससससटटटटीीीीएएएएसससस (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी ससससददुुददुु ढ़ढ़ढ़ढ़ृृृृ ीीीीककककररररणणणण ययययोोोोजजजजननननााााUUUU ककककेेेे ससससााााथथथथ)))) >>>>.... सससस..ंं..ंं ससससबबबब----(cid:12)(cid:12)(cid:12)(cid:12)टट ट ट ेेशशेेशशनननन ववववोोोो4444टट टट ेेजजेेजज अअअअननननपपुुपपुु ाााातततत VVVV>>>>ययययाााा5555वव वव ययययनननन (cid:7)(cid:7)(cid:7)(cid:7)ममममतततताााा िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथिििितततत ((((ककककेेेेववववीीीी////ककककेेेेववववीीीी)))) एएएएजजजजसस(cid:27)(cid:27)सस(cid:27)(cid:27) ीीीी ((((एएएएमममम डडडड(cid:2)(cid:2)(cid:2)(cid:2)44 44 यय यय ूू ूू //// एएएएममममववववीीीीएएएए)))) IIII.... 555500000000 ककककेेेेववववीीीी एएएएचचचचववववीीीीडडडडीीीीससससीीीी((((ससससबबबब---- (cid:12)(cid:12)(cid:12)(cid:12)टट ट ट ेेशशेेशशनननन)))) 1 बिलया और िभवाड़ी पपपपीीीीजजजजीीीीससससीीीीआआआआ 1250 ड(cid:4)(cid:18)यूआईपी ईईईईएएएएलललल (2x1250 मेगावाट) पर कंवट(र ,टेशन-िuतीय पोल 2. मुं4ा और मोGह4गढ़ अअअअददददााााननननीीीी 2500 ड(cid:4)(cid:18)यूआईपी (2x1250 मेगावाट) पर कंवट(र ,टेशन- उउउउhhhhररररीीीी (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे मममम (cid:27)(cid:27) (cid:27)(cid:27) (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी ससससददुुददुु ढ़ढ़ढ़ढ़ृृृृ ीीीीककककररररणणणण ययययोोोोजजजजननननाााा:::: ययययोोोोजजजजननननाााा ििििववववववववररररणणणण िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथिििितततत तािलका संmय ा:::: एएएएननननआआआआरररर----आआआआईईईईएएएएसससस----00001111/अअअअ;;;;ययययाााायययय----6666 एन आर .णाली 1. गुड़गांव (पीजी से(cid:25)टर 72)-मानेसर 400केवी क(cid:10)ठन आरओड(cid:4)(cid:18)य ू सम,या। सुदढ़ृ ीकरण योजना- डी/सी((cid:141)ैद) XIII 2. मानेसर म(cid:19) 2X 500 एमवीए पारेषण 8मता 7)यांवयन और सव@8ण .गित वाले 400/200 केवी सब-,टेशन कV ,थापना म(cid:19) ड(cid:4)(cid:18)यूआईपी 3. आगरा-समयपुर और समयपुर-गुड़गांव (पीजी से(cid:25)टर-72) 400 केवी लाइन का समयपुर स े अलगाव और आगरा से गुड़गांव (पीजी से(cid:25)टर- 72) एस/सी स6कट तक सीधी लाइन का िनमा(ण करना 4. फतेहाबाद 400/200 केवी सब-,टेशन पर दो 220 केवी बे 5. मानेसर म(cid:19) 125 एमवीएआर बस (cid:10)रए(cid:25)टर ततततााााििििललललककककाााा ससससaaंंaaंं यय यय ाााा: एएएएननननआआआआरररर----आआआआईईईईएएएएसससस----00002222/अअअअ;;;;ययययाााायययय----6666612 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] एन आर .णाली 1. प(cid:10)टयाला(.थम स6कट का एलआईएलओ पहले 8/11 म(cid:19) कमीशन aआ। सुदढ़ृ ीकरण योजना- ही हो चुका ह)ै म(cid:19) नालागढ़-कैथल 400केवी -XIV स6कट (नालागढ़-िहसार 400केवी डी/सी लाइन का (cid:10)(cid:26)पल ोबड( सेकंड स6कट) का एलआईएलओ 2 प(cid:10)टयाला म(cid:19) अित(cid:10)रक्त 500 एमवीए कमीशन aआ। 400/200 केवी आईसीटी (िजसकV 8मता 2X315 एमवीए ह)ै 3. मालेकोटला म(cid:19) अित(cid:10)र‚ 500 एमवीए कमीशन aआ। 400/200 केवी आईसीटी (िजसकV 8मता 2X315 एमवीए ह)ै 4. प(cid:10)टयाला म(cid:19) 125 एमवीएआर बस (cid:10)रए(cid:25)टर कमीशन aआ। तािलका संmय ा:::: एएएएननननआआआआरररर---- आआआआईईईईएएएएसससस ----00003333/अअअअ;;;;ययययाााायययय----6666 एन आर .णाली 1. मानेसर-नीमराना 400 केवी डी/सी ड(cid:4)(cid:18)यूआईपी सुदढ़ृ ीकरण योजना- 2. िभवाड़ी-नीमराना 400 केवी डी/सी ,(cid:26)dGजग माच (11 से आरंभ aआ । XV 3. कोटपुतली म(cid:19) नए 400/200 केवी एस/एस कV 7)यांवयन और सव@8ण .गित ,थापना के िलए िभवाड़ी-जयपुर 400केवी म(cid:19) एस/सी का एलआईएलओ 4. नीमराना म(cid:19) 2x315 एमवीए पारेषण 8मता कमीशन aआ। वाले 400/200 केवी सब-,टेशन कV ,थापना 5. कोटपुतली म(cid:19) 2x315 एमवीए पारेषण 8मता ड(cid:4)(cid:18)यूआईपी वाले 400/200 केवी सब-,टेशन कV ,थापना तािलका संmय ा:::: एएएएननननआआआआरररर---- आआआआईईईईएएएएसससस ----00004444/अcयाय----6666 एन आर .णाली 1. 3यू वनपोह म(cid:19) नय े 400/200केवी एस/एस के ड(cid:4)(cid:18)यूआईपी सुदढ़ृ ीकरण योजना िनमा(ण के िलए 7कशनपुर-वगूरा 400 केवी -XVI डी/सी के दोन^ स6कट का एलआईएलओ 2. 7कशनपुर-3यू वनपोह 400केवी डी/सी ड(cid:4)(cid:18)यूआईपी 3. 3यू वनपोह म(cid:19) 2x315 एमवीए पारेषण 8मता ड(cid:4)(cid:18)यूआईपी वाले 400/200 केवी सब-,टेशन कV ,थापना¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 613 तािलका संmय ा:::: एएएएननननआआआआरररर---- आआआआईईईईएएएएसससस ----00005555/अcयाय----6666 एन आर .णाली नीमराना-िसकर 400केवी डी/सी लाइन पूण ( हो गयी। सुदढ़ृ ीकरण योजना -XVII तािलका संmय ा:::: एएएएननननआआआआरररर---- आआआआईईईईएएएएसससस ----00006666/अcयाय----6666 एन आर .णाली 1. बागपत-दहे रादनू 400केवी डी/सी ((cid:141)ैद) बागपत और दहे रादनू सब- सुदढ़ृ ीकरण योजना ,टेशन िनधा((cid:10)रत समयाविध म(cid:19) -XVIII पूण( कV गयी (जमीन अभी भी स\पना बाकV ह)ै । 2. दहे रादनू म(cid:19) 2x315 एमवीए पारेषण 8मता ड(cid:4)(cid:18)यूआईपी वाले 400/220 केवी सब-,टेशन कV ,थापना ििििहहहहममममााााचचचचलललल (cid:30)(cid:30)(cid:30)(cid:30)ददददशशेेशशेे मममम (cid:27)(cid:27) (cid:27)(cid:27) अअअअवववविििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथतततत उउउउDDDDपपपपााााददददनननन पपपप((((ररररययययोोोोजजजजननननााााएएएए::ंं::ंं उउउउDDDDपपपपााााददददनननन पपपप((((ररररययययोोोोजजजजननननााााएएएए ंंंं ििििववववववववररररणणणण िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथिििितततत तािलका संmय ा:::: एएएएननननआआआआरररर----एएएएचचचचपपपपीीीी----00001111/अcयाय----6666 चमेरा॥। एचईपी 1. चमेरा ॥।एईपी के नजदीक पुGलग वन चरण-॥ का अनुमोदन लंिबत ह ै । (एनएचपीसी) (3x77 ,टेशन-जु(cid:18)लनदरु लाइन िनधा(cid:10)( रत समयाविध म(cid:19) चमेरा जेनरल मेगावाट) (12वd योजना म(cid:19) 400केवी डी/सी प(cid:10)रयोजना पूण( कV गई। ,थानांत(cid:10)रत) 2. चमेरा ॥ एचईपी के नजदीक 8/11 म(cid:19) कमीशन aआ। चमेरा-॥।-चमेरा पुGलग ,टेशन 3. चमेरा ॥ एचईपी के नजदीक 8/11 म(cid:19) कमीशन aआ। जीआईएस पुGलग ,टेशन तािलका संmय ा:::: एएएएननननआआआआरररर----एएएएचचचचपपपपीीीी----00002222/अअअअ;;;;ययययाााायययय----6666 पाब(ती-॥। एचईपी (4x130 1. पाव(ती पुGलग *वाइंट, अमृतसर वन अनुमोदन लंिबत (पाब(ती-॥।- मेगावाट) पर 400केवी डी/सी पाब(ती-॥- अमृतसर लाइन के साथ िमला aआ (12वd योजना म(cid:19) कोलडम/नालगढ़ का ,थानांत(cid:10)रत) एलआईएलओ 2. पाब(ती-॥।पर 400केवी डी/सी टावर िनमा(ण आरंभ aआ। पाब(ती-॥-पाब(ती पुGलग *वाइंट का एलआईएलओ614 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 3. 80 एमवीएआर (cid:10)रए(cid:25)टर के साथ वन मसौदा (िहमाचल .दशे भाग) जून पाब(ती पुGलग *वाइंट- अमृतसर 10 म(cid:19) एमओईएफ, नई 7द(cid:18)ली को 400केवी डी/सी अSेिषत।व3य जीव अभयारUय 8े9 को अनदखे ा कर लाइन कV (cid:10)र-WHटग कV गई ह।ै चरण-॥ कV ,वीकृित अभी .तीि8त ह।ै 4. 400केवी पाब(ती पुGलग ,टेशन (जीआईएस) कV ,थापना तािलका संmय ा:::: एएएएननननआआआआरररर----एएएएचचचचपपपपीीीी----00003333/अcयाय----6666 करचम वांगटू 1. करचम वांगटू- अ(cid:4)द(cid:18)ु लापुर जेवीको. uारा िनमा(णाधीन एचईपी(4x250 400केवी डी/सी मेगावाट)(कमीशन हो गया) 2. अ(cid:4)द(cid:18)ु लापुर- सोनीपत 400केवी 3/11 म(cid:19) कमीशन aआ। डी/सी तािलका संmय ा:::: एएएएननननआआआआरररर----एएएएचचचचपपपपीीीी----00004444/अcयाय----6666 बुिधल एचईपी (लgको Sीन) बुिधल-चमेरा- III 220केवी एस/सी कमीशन aआ। एचपी (2x35मेगावाट) (12वd योजना म(cid:19) ,थानांत(cid:10)रत) तािलका संmय ा:::: एएएएननननआआआआरररर----एएएएचचचचपपपपीीीी----00005555/अcयाय----6666 मलाना II 1. मलाना ॥ एचईपी- छौर पूण( कV गयी ,(cid:26)dGजग। एचईपी(ईपीपीएल)(2x50 132केवी डी/सी मेगावाट) (कमीशन aआ) 2. छौर 220 केवी डी/सी पर पूण( कV गयी ,(cid:26)dGजग। अ(cid:18)लैन दहु गं न-नालागढ़ का एलआईएलओ 3. 220 केवी/132केवी छौर आरंभ होन े के िलए तैयार। एस/एस¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 615 जDम ू और कiम ीर म(cid:19) अवि,थत उ&पादन प(cid:10)रयोजनाए::ं:: उउउउDDDDपपपपााााददददनननन पपपप((((ररररययययोोोोजजजजननननााााएएएए ंंंं ििििववववववववररररणणणण िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथिििितततत तािलका संmय ा:::: एएएएननननआआआआरररर----जजजजककेेककेे ेेेे----00001111/अअअअ;;;;ययययाााायययय----6666 यूआरआई-II एचईपी यूआरआई I- यूआरआईII 400 केवी लाइन .भार के िलए तैयार (एनएचपीसी) 4x60 एस/सी ह।ै एनएचपीसी uारा िनtमत 8े9 कV मेगावाट (12वd योजना म(cid:19) सहमित कमीशन होने के िलए .तीि8त ,थानांत(cid:10)रत) ह।ै यूआरआई I- वगूरा 400 केवी िनयम कानून कV सम,या और दो एस/सी महीन^ कV लगातार बफ(बारी स े काय( बािधत aआ। तािलका संmय ा:::: एएएएननननआआआआरररर----जजजजककेेककेे ेेेे----00002222/अअअअ;;;;ययययाााायययय----6666 एनएचपीसी(4x11मेगावाट) .णाली 66केवी ,तर तक उपल(cid:4)ध (12वd योजना म(cid:19) ह।ै ,थानांत(cid:10)रत) तािलका संmय ा:::: एएएएननननआआआआरररर----जजजजककेेककेे ेेेे----00003333/अअअअ;;;;ययययाााायययय----6666 िनमू बाजगो (एनएचपीसी) .णाली 66केवी ,तर तक उपल(cid:4)ध (3X15 मेगावाट) (12वd ह।ै योजना म(cid:19) ,थानांत(cid:10)रत) उ`राखंड म(cid:19) अवि,थत उ&पादन प(cid:10)रयोजनाए::ं:: उउउउDDDDपपपपााााददददनननन ििििववववववववररररणणणण िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथिििितततत पपपप((((ररररययययोोोोजजजजननननााााएएएए ंं ंं तािलका संmय ा:::: एएएएननननआआआआरररर----यूके----00001111/अअअअ;;;;ययययाााायययय----6666 कोटे(cid:157)र (कमीशन 1. कोटे(cid:157)र- टेहरी पुGलग *वाइंट स6कट-1 परी8ण 23.02.11 को और aआ) स6कट-II परी8ण माच( 11 म(cid:19) aआ। 2. टेहरी पुGलग *वाइंट (400 केवी पर स6कट-I का एलआईएलओ पूण ( aआ और आवेिशत होनेवाला) पर टेहरी-मेरठ परी8ण 21.01.11 को aआ तथा का एलआईएलओ स6कट-II परी8ण 6/11 को aआ।616 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 3. टेहरी-मेरठ लाइन का 50% मुआवजा 4. टेहरी पुGलग ,टेशन(जीआईएस) कV ,थापना 7द(cid:18)ल ी म(cid:19) अवि,थत उ&पादन प(cid:10)रयोजनाए::ं:: उउउउDDDDपपपपााााददददनननन पपपप((((ररररययययोोोोजजजजननननााााएएएए ंंंं ििििववववववववररररणणणण िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथिििितततत तािलका संmय ा:::: एएएएननननआआआआरररर----डडडडीीीीएएएएलललल----00001111/अअअअ;;;;ययययाााायययय----6666 .गित सीसीजीटी फेज-III मौजूदा 400 केवी बवाना बस का डीटीएल के uारा काय ( (पीपीसीएल) िवभाजन (4x250+2x250) 400 केवी ि,वचयाड( बस का ि,*लट मेगावाट (12वd योजना म(cid:19) बस म(cid:19) िव,तार ,थानांत(cid:10)रत) तािलका संmय ा:::: एएएएननननआआआआरररर----डडडडीीीीएएएएलललल----00002222/अअअअ;;;;ययययाााायययय----6666 (cid:10)रठाला सीसीपीपी .णाली 66 केवी ,तर पर (एनडीपीएल) (एनडीपीएल) (जीटी+एसटी 108 मेगावाट) (,थािपत) ह(cid:10)रयाणा म(cid:19) अवि,थत उ&पादन प(cid:10)रयोजनाए::ं:: उउउउDDDDपपपपााााददददनननन ििििववववववववररररणणणण िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथिििितततत पपपप((((ररररययययोोोोजजजजननननााााएएएए ंं ंं एएएएननननआआआआरररर----एएएएचचचचआआआआरररर----00001111/अअअअ;;;;ययययाााायययय----6666 झ¡र-I(इं7दरा गांधी) 1. झ¡र-दौलबाताद 400केवी डी/सी स6कट 1 ,थािपत। िuतीय स6कट फरवरी टीपीएस (3x500 11 म(cid:19) ,थािपत aआ। मेगावाट) (यू-1, यू-2 2. झ¡र-मुंडका(7द(cid:18)ली) 400केवी .थम स6कट 9/10 म(cid:19) ,थािपत aआ और ,थािपत हो गया, डी/सी िuतीय स6कट 11/10 म(cid:19) ,थािपत aआ। यू-3 12वd योजना म(cid:19) 3. झ¡र(टीपीएस)-/धन\डा 400केवी ड(cid:4)(cid:18)यूआईपी ,थानांत(cid:10)रत।) डी/सी 4. दौलताबाद (3x315) 400/220 पहला और दसू रा (cid:26)ांसफाम(र जांच 11/10 केवी एस/एस म(cid:19) aआ और तीसरा (cid:26)ांसफाम(र जांच 12/।0 म(cid:19) aआ।¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 617 5. मुंडका (2x315) 400/220 केवी पहला (cid:26)ांसफाम(र 9/10 म(cid:19) ,थािपत aआ एस/एस और िuतीय (cid:26)ांसफाम(र 3/11 म(cid:19) ,थािपत aआ। 6. मुंडका (2x160) 400/220 केवी ,थापना के िलए तैयार। एस/एस एएएएननननआआआआरररर----एएएएचचचचआआआआरररर----00002222/अअअअ;;;;ययययाााायययय----6666 झ¡र -I (महा&मा 1. आरजीईएस- सोनीपत (दीलापुर) गांधी) टीपीएस 220 केवी डी/सी (2x660 मेगावाट) 2 . द ी ल ा प ुर – ए च ए स आईडीसी 220केवी काय( .दान 7कया गया। डी/सी ( यू-I ,थािपत हो 3. दीलापुर –बरही 220 केवी डी/सी काय( .दान नहd 7कया गया। गया, यू-2 12वd 4. दीलापुर –ताजपुर 220 केवी डी/सी योजना म(cid:19) 5. दीलापुर –बरही 220 केवी डी/सी ,थानांत(cid:10)रत) 6. झ¡र(टीपीएस)-धन^डा 400केवी ,थािपत डी/सी 7. झ¡र-कबुलपुर 400 केवी डी/सी ,थािपत 8. कबुलपुर-दीलापुर 400केवी डी/सी ,थािपत 9. झ¡र टीपीएस पर 400 केवी ,थािपत झ¡र(एपीसीपीएल)- दौकताबाद लाइन का एलआईएलओ 10. दीलापुर 400/200 केवी और ,थािपत 220/132 केवी एस/एस 11.कबुलपुर 400/200 केवी और ,थािपत 220/132 केवी एस/एस राज,थ ान म(cid:19) अवि,थत उ&पादन प(cid:10)रयोजनाए::ं:: उउउउDDDDपपपपााााददददनननन ििििववववववववररररणणणण िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथिििितततत पपपप((((ररररययययोोोोजजजजननननााााएएएए ंं ंं तािलका संmय ा:::: एएएएननननआआआआरररर –––– आआआआररररजजजज ेे ेे ----00001111/अअअअ;;;;ययययाााायययय ----6666 जि(cid:18)लपा कपुदC 1. राजवे,ट-जोधपुर 400केवी डी/सी 5/10 म(cid:19) ,थािपत618 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] टीपीपी (8x135 2. राजवे,ट-बारमेर 400केवी डी/सी .थम स6कट 5/10 म(cid:19) और िuतीय स6कट मेगावाट) (राजवे,ट 3/11 म(cid:19) ,थािपत पावर) (यूिनट 1 स े 4 3. राजवे,ट-ढोरीम›ा 400केवी डी/सी 3/12 म(cid:19) ,थािपत तक 11वd योजना म(cid:19) 4. राजवे,ट एलटीपीएस डी/सी पर 8/08 म(cid:19) ,थािपत ,थािपत aआ) िगरल-बारमेर का एलआईएलओ उ&त र .दशे म(cid:19) अवि,थत उ&पादन प(cid:10)रयोजनाए::ं:: उउउउDDDDपपपपााााददददनननन पपपप((((ररररययययोोोोजजजजननननााााएएएए ंंंं ििििववववववववररररणणणण िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथिििितततत तािलका संmय ा:::: एएएएननननआआआआरररर----यूपी----00001111/अअअअ;;;;ययययाााायययय----6666 अनपारा 'सी' (लgको 1. केवी बस का अनपारा बी स े 6/10 काय( 6/10 म(cid:19) पूण( aआ अनपारा पीपीएल अनपारा सी म(cid:19) िव,तार (2x600 मेगावाट) 2. अनपारा बी - अनपारा सी लाइन .भार aआ। (,थािपत) ि,वचयाड ( स े 765 केवी अनपारा बी- उ›ाव टtमनेशन *वाइंट का ,थान प(cid:10)रवत(न 3. उ›ाव म(cid:19) 765 केवी अनपारा-उ›ाव ,थािपत का ,थान प(cid:10)रवत(न 4. उ›ाव 765/400 केवी एस/एस ,थािपत तािलका संmय ा:::: एएएएननननआआआआरररर----यूपी----00002222/अअअअ;;;;ययययाााायययय----6666 हरदआु गंज टीपीएस यू- हरदआु गंज-जहांगीराबाद 220 केवी मौजूदा .णाली यू-8 और यू-9 के िलए 8 और9 (2x250 डी/सी पया(r ह।ै िनमा(ण काय( आरंभ हो गया। मेगावाट) (यू-8 ,थािपत हो गया,यू-9 12वd योजना म(cid:19) ,थानांत(cid:10)रत। तािलका संmय ा:::: एएएएननननआआआआरररर----यूपी----00003333/अcयाय----6666 प(cid:10)रछा टीपीएस 1. प(cid:10)रछा-ओराई 400केवी डी/सी काय ( .गित म(cid:19) ह।ै ए(cid:25)सट(cid:19)शन 2. ओराई-मैनपुरी 400केवी डी/सी काय( .गित म(cid:19) ह।ै (यूपीआरवीयूएनएल) 3. मैनपुरी(765 केवी)-मैनपुरी पीपीपी अव,था म(cid:19) .,तािवत। 2x250 मेगावाट (12वd (पीजीसीआईएल) 400केवी डी/सी योजना म(cid:19) ,थानांत(cid:10)रत।) 4. मैनपुरी 400 केवी डी/सी म(cid:19) आगरा-आगरा (पीजीसीआईएल)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 619 का एलआईएलओ 5. प(cid:10)रछा-भौती ,थािपत 6. प(cid:10)रछा-बांदा पाट( I 220 केवी काय( .गित म(cid:19) ह।ै एस/सी 7. प(cid:10)रछा-बांदा पाट( II 220 केवी पूण( एस/सी 8. मैनपुरी 765/400केवी एस/एस पीपीपी अव,था म(cid:19) .,तािवत। 9. ओरई 400/220 केवी एस/एस तािलका संmय ा:::: एएएएननननआआआआरररर----यूपी----00004444/अcयाय----6666 रोसा एसटी II 1. शाहजहांपुर म(cid:19) (पीजीसीआईएल) लखनऊ- ,थािपत (2x300 मेगावाट) बरेली 400केवी लाइन का एलआईएलओ (िनजी 8े9) 2. शाहजहांपुर म(cid:19) ((cid:10)रलायसं ) लखनउ-बरेली ,थािपत (,थािपत) 400केवी लाइन का एलआईएलओ 3. डी/सी पर रोजा-डोहना 220केवी लाइन काय( .गित म(cid:19) ह।ै एस/सी पपपपिििि````ममममीीीी (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे मममम (cid:27)(cid:27) (cid:27)(cid:27) (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी ससससददुुददुु ढ़ढ़ढ़ढ़ृृृृ ीीीीककककररररणणणण ययययोोोोजजजजननननाााा :::: ययययोोोोजजजजननननाााा ििििववववववववररररणणणण िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथिििितततत तािलका संmय ा:::: डडडड(cid:2)(cid:2)(cid:2)(cid:2)4444ययययआआूूआआूू रररर----आआआआईईईई----00001111/अcयाय----6666 पिZमी 8े9 एसईटी-ए: पिZमी 8े9 के पूवC और सुदढ़ृ ीकरण योजना-II मcय भाग म(cid:19) आयात के िलए वधा( (पीजी)- पलC (पीजी) 400केवी 7/11 म(cid:19) ,थािपत। डी/सी रायपुर (पीजी)- वधा( (पीजी) 400केवी लाइन म(cid:19) आरओड(cid:4)(cid:18)य ू सम,या और डी/सी िबलंिबत वन ,वीकृित के कारण काय ( .भािवत भ4ावती (पीजी)-पलC (पीजी) 400 केवी माच( 11 म(cid:19) लाइन .भार। डी/सी620 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] िuतीय एस/सी िसवनी (पीजी)- वधा( ,थािपत (पीजी) लाइन (आरंभ म(cid:19) 400केवी पर .चािलत करन े के िलए) पलC (एमएसईटीसीएल)- पलC (पीजी) लाइन पूण ( aआ। 400केवी डी/सी एसईटी-डी : उ`री मcय.दशे म(cid:19) 8े9ीय सुदढ़ृ ीकरण के िलए 1. कोरबा(एनटीपीसी)-RीGसहपुर लाइन ,थािपत aआ। (एमपीजेनको) 400केवी डी/सी 2. RीGसहपुर (एमपीजेनको)-दमोह लाइन पूण ( और ,थािपत aआ। 400केवी डी/सी 3. दमोह- भोपाल 400केवी डी/सी ,थािपत लाइन 4. बीना-Pवािलयर 765 केवी िuतीय ,थािपत एस/सी लाइन (400 केवी पर .चािलत करन े के िलए) तािलका संmय ा:::: डडडड(cid:2)(cid:2)(cid:2)(cid:2)4444ययययआआूूआआूू रररर----आआआआईईईई----00002222/अअअअ;;;;ययययाााायययय----6666 पिZमी 8े9 िसपत के नजदीक ड(cid:4)(cid:18)यूआर पुGलग ,थ ािपत सुदढ़ृ ीकरण योजना - ,टेशन पर 765 केवी एस/सी िसपत- X िसवनी लाइन का एलआईएलओ तािलका संmय ा:::: डडडड(cid:2)(cid:2)(cid:2)(cid:2)4444ययययआआूूआआूू रररर----आआआआईईईई----00003333/अcयाय----6666 पिZमी 8े9 िसपत के नजदीक ड(cid:4)(cid:18)यूआर पुGलग ,थािपत सुदढ़ृ ीकरण योजना - ,टेशन पर 765केवी िसपत-िसवनी XI (िuतीय स6कट) का एलआईएलओ 1x500एमवीए, ड(cid:4)(cid:18)यूआर पुGलग ,टेशन पर तृतीय (cid:26)ांसफाम(र¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 621 गुजरात म(cid:19) अवि,थत उ&पादन प(cid:10)रयोजनाए::ं:: उउउउDDDDपपपपााााददददनननन ििििववववववववररररणणणण िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथिििितततत पपपप((((ररररययययोोोोजजजजननननााााएएएए ंं ंं तािलका संmय ा:::: डडडड(cid:2)(cid:2)(cid:2)(cid:2)4444ययययआआूूआआूू रररर----जजजजीीीीजजजज--ेे--ेे 00001111/अअअअ;;;;ययययाााायययय----6666 हि़जरा टीपीपी हि़जरा टीपीपी (जीएसईसीएल) 351 हि़जरा टीपीपी (जीएसईसीएल) 351 (जीएसईसीएल) 351 मेगावाट (,थािपत) मेगावाट (,थािपत) मेगावाट (,थािपत) तािलका संmय ा:::: डडडड(cid:2)(cid:2)(cid:2)(cid:2)4444ययययआआूूआआूू रररर----जजजजीीीीजजजज--ेे--ेे 00002222/अअअअ;;;;ययययाााायययय----6666 मुं4ा टीपीपी फेज II मुं4ा टीपीपी फेज II (2x660 मेगावाट) मुं4ा टीपीपी फेज II (2x660 मेगावाट) (2x660 मेगावाट) (,थािपत) (,थािपत) (,थािपत) तािलका संmय ा:::: डडडड(cid:2)(cid:2)(cid:2)(cid:2)4444ययययआआूूआआूू रररर----जजजजीीीीजजजज ेे ेे ----00003333/ अअअअ;;;;ययययाााायययय ----6666 मुं4ा टीपीपी फेजIII मुं4ा टीपीपी फेजIII 3x660 मेगावाट ,थ ािपत 3x660 मेगावाट (अदानी पावर), (,थािपत) (अदानी पावर), 1. मोGहदरगढ़ एचवीडीसी- मोGहदरगढ़ (,थािपत) एचवीपीएनएल (धन^डा) 400केवी 2. मोGहदरगढ़ एचवीडीसी-िभवानी 400 केवी 3. धन^डा-दौलताबाद((cid:141)ैद) 400केवी 4. मानेसर 400 केवी पर धन^डा- दौलताबाद का एलआईएलओ 5. धन^डा (मोGहदरगढ़) 400/220 केवी 6. औरंगाबाद (पीजी) – औरंगाबाद (एमएसईटीसीएल) ततततााााििििललललककककाााा ससससaaंंaaंं यय यय ाााा :::: डडडड(cid:2)(cid:2)(cid:2)(cid:2)4444ययययआआूूआआूू रररर----जजजजीीीीजजजज--ेे--ेे 00004444////अअअअ;;;;ययययाााायययय----6666 सूरत िल‹ाइट सूरत िल‹ाइट ए(cid:25)सट(cid:19)शन (250 सूरत िल‹ाइट ए(cid:25)सट(cid:19)शन (250 मेगावाट) ए(cid:25)सट(cid:19)शन (250 मेगावाट) (रा2य 8े9) (,थािपत) (रा2य 8े9) (,थािपत) मेगावाट) (रा2य 8े9) (,थािपत)622 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] तािलका संmय ा:::: डडडड(cid:2)(cid:2)(cid:2)(cid:2)4444ययययआआूूआआूू रररर----जजजजीीीीजजजज--ेे--ेे 00005555/अअअअ;;;;ययययाााायययय----6666 ए,सार पावर 1. जेनरेशन ि,वचयाड( पर 1x125 ड(cid:4)(cid:18)यूआईपी सािलया 2x600 एमवीएआर बस (cid:10)रए(cid:25)टर के साथ (िनजी 8े9) ईपीजीएल टीपीएस- बचाऊ400केवी (,थािपत) डी/सी ((cid:10)(cid:26)पल) 2. वािडनार ईपीजीएल टीपीएस- ,थािपत हडाला 400केवी डी/सी 3. वािडनार ईपीजीएल टीपीएस- ड(cid:4)(cid:18)यूआईपी अमरेली 400केवी डी/सी महाराJ(cid:26) म(cid:19) अवि,थत उ&पादन प(cid:10)रयोजनाए::ं:: उउउउDDDDपपपपााााददददनननन पपपप((((ररररययययोोोोजजजजननननााााएएएए ंंंं ििििववववववववररररणणणण िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथिििितततत तािलका संmय ा:::: डडडड(cid:2)(cid:2)(cid:2)(cid:2)4444ययययआआूूआआूू रररर----एएएएममममएएएएचचचच----00001111/अअअअ;;;;ययययाााायययय----6666 भुसावल टीपीपी 1. 3यू भुसावल-औरंगाबाद 400केवी ,थािपत (एमएसपीजीसीएल) डी/सी 2x500 मेगावाट 2. भुसावल-II-औरंगाबाद 400 के वी डी/सी ,थािपत (,थािपत) 3. भुसावल-II- खडका 400 केवी डी/सी 4/10 म(cid:19) ,थािपत 4. भुसावल-II- आमलनेर 220 केवी ,थािपत डी/सी 5. केवी 3य ू भुसावल एस/एस- एम/सी ,थािपत पर मौजूदा 400 केवी खडका डी/सी 6. भुसावल-II 400/220 केवी एस/एस ,थािपत तािलका संmय ा:::: डडडड(cid:2)(cid:2)(cid:2)(cid:2)4444ययययआआूूआआूू रररर----एएएएममममएएएएचचचच----00002222/अअअअ;;;;ययययाााायययय----6666 खापरखेडा टीपीएस 1. खापरखेडा टीपीएस-कोरादी काय( .गित म(cid:19) ह।ै (एमएसपीजीसीएल) 400केवी एस/सी (1x500 मेगावाट) 2. खापरखेडा टीपीएस 400 केवी 11/09 म(cid:19) ,थािपत (,थािपत) डी/सी पर कोराडी-चं4पुर का एलआईएलओ 3. खापरखेडा टीपीएस- खापरखेडा ,थािपत (मौजूदा) 220 केवी 2x डी/ससी 4. खापरखेडाएस/एस (2x500एमवीए) ,थािपत¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 623 तािलका संmय ा:::: डडडड(cid:2)(cid:2)(cid:2)(cid:2)4444ययययआआूूआआूू रररर----एएएएममममएएएएचचचच----00003333/अअअअ;;;;ययययाााायययय----6666 जेएसड(cid:4)(cid:18)यू एनजC 1. जैगड-3य ू कोयना 400केवी डी/सी स6कट 1 7/10 म(cid:19) ,थािपत aआ और स6कट (र¢ािगरी िलिमटेड) 2 8/10 म(cid:19) ,थािपत aआ। 4x300 मेगावाट 2. जैगड-कराड 400केवी डी/सी ,थािपत (,थािपत) तािलका संmय ा:::: डडडड(cid:2)(cid:2)(cid:2)(cid:2)4444ययययआआूूआआूू रररर----एएएएममममएएएएचचचच----00004444/अअअअ;;;;ययययाााायययय----6666 िमहान टीपीपी 220केवी वधा(-1 से अंबाजारी एस/सी ,थािपत (अिभजीत एनजC) लाइन का एलआईएलओ (4x500 मेगावाट) (,थािपत) मcय .दशे म(cid:19) अवि,थत उ&पादन प(cid:10)रयोजनाए::ं:: उउउउDDDDपपपपााााददददनननन ििििववववववववररररणणणण िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथिििितततत पपपप((((ररररययययोोोोजजजजननननााााएएएए ंं ंं तािलका संmय ा:::: डडडड(cid:2)(cid:2)(cid:2)(cid:2)4444ययययआआूूआआूू रररर----एमपी----00001111/अअअअ;;;;ययययाााायययय----6666 मह(cid:157)े र एचईपी 1. मह(cid:157)े र-िनमरानी 220केवी डी/सी 5/10 म(cid:19) ,थािपत (10x40 2. मह(cid:157)े र-िपतमपुर 220 केवी डी/सी ड(cid:4)(cid:18)यूआईपी अंितम वन ,वीकृित .ाr aआ। मेगावाट)(12वd 3. मह(cid:157)े र-राजगढ़ 220केवी डी/सी काय( आ,थिगत। योजना म(cid:19) ,थानांत(cid:10)रत) छ`ीसगढ़ म(cid:19) अवि,थत उ&पादन प(cid:10)रयोजनाए::ं:: उउउउDDDDपपपपााााददददनननन ििििववववववववररररणणणण िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथिििितततत पपपप((((ररररययययोोोोजजजजननननााााएएएए ंं ंं तािलका संmय ा:::: डडडड(cid:2)(cid:2)(cid:2)(cid:2)4444ययययआआूूआआूू रररर----ससससीीीीजजजजीीीी----00001111/अअअअ;;;;ययययाााायययय----6666 ििििससससपपपपतततत –I 1. िसपत -िसवनी लाइन -1 ,थ ािपत (3x660 ममममगगेेगगेे ााााववववााााटटटट) 1. िसपत -िसवनी लाइन -2 ,थ ािपत (कककक(cid:27)(cid:27)(cid:27)(cid:27)CCCCीीीीयययय (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे ) 2. िसवनी-खंडवा 400केवी डी/सी ,थ ािपत (यययय--ूू--ूू 1111 औऔऔऔरररर 2222 ((cid:141)ैद एएएसी) (cid:12)(cid:12)(cid:12)(cid:12)थथ थथ ााााििििपपपपतततत) 2. िसपत 400 केवी डी/सी पर कोरबा ,थ ािपत एसटीपीएस-रायपुर के एक स6कट का एलआईएलओ624 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 3. िसवनी 400केवी डी/सी पर िभलाई- ,थ ािपत सतपुरा एस/सी लाइन का एलआईएलओ 4. नागडा-डहे गम 400केवी डी/सी ,थ ािपत 5. राजगढ़ 400 केवी 2xडी/सी पर ,थ ािपत एस.सरोवर-नागडा डी/सी के दोन^ स6कट का एलआईएलओ 6. िसवनी एस/एस 765/400 केवी ,थ ािपत (7x500 एकल फेज यूिनट) 7. िसवनी 400/220केवी 2x315 एमवीए ,थ ािपत एस/एस 8. राजगढ़ 400/220 केवी 2x315 ,थ ािपत एमवीए एस/एस तािलका संmय ा:::: डडडड(cid:2)(cid:2)(cid:2)(cid:2)4444ययययआआूूआआूू रररर----ससससीीीीजजजजीीीी----00002222/अअअअ;;;;ययययाााायययय----6666 एस वी पावर एस वी पावर पर 220 केवी कोरबा-मोपाका ,थािपत टीपीपी (,थािपत) लाइन का एलआईएलओ तािलका संmय ा:::: डडडड(cid:2)(cid:2)(cid:2)(cid:2)4444ययययआआूूआआूू रररर----ससससीीीीजजजजीीीी----00003333/अअअअ;;;;ययययाााायययय----6666 कसाईप(cid:18)ली टीपीपी 3. कसाईप(cid:18)ली-िसपत (भराई) पुGलग पूण( कV गयी ,(cid:26)dGजग। (2x135 मेगावाट) ,टेशन 400केवी डी/सी (यू-1 ,थािपत) 4. कसाईप(cid:18)ली पर कोरबा-भाटापारा का ,थािपत (अंत(cid:10)रम ‡व,था) एलआईएलओ ददददिििि(cid:7)(cid:7)(cid:7)(cid:7)णणणणीीीी (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे मममम (cid:27)(cid:27) (cid:27)(cid:27) (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी ससससददुुददुु ढ़ढ़ढ़ढ़ृृृृ ीीीीककककररररणणणण ययययोोोोजजजजननननााााःःःः ययययोोोोजजजजननननाााा ििििववववववववररररणणणण िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथिििितततत ततततााााििििललललककककाााा ससससaaंंaaंं ययययाााा:::: एएएएससससआआआआरररर----आआआआइइइइएएएएसससस----00001111/अcयाय----6666 एसआरएसएसएस - मैसूर-हसन 400केवी डी/सी लाइन 6/11 म(cid:19) ,थािपत aआ। IX ततततााााििििललललककककाााा ससससaaंंaaंं ययययाााा:::: एएएएससससआआआआरररर----आआआआईईईईएएएएसससस----00002222/अcयाय----6666 एसआरएसएसएस - िबडाडी म(cid:19) 400 केवी नीलमंगला- आरंभ कV गयी ,(cid:26)dGजग X सोमनह(cid:18)ली के दोन^ स6कट का एलआईएलओ¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 625 ततततााााििििललललककककाााा ससससaaंंaaंं ययययाााा :::: एएएएससससआआआआरररर----आआआआईईईईएएएएसससस ----00003333/अcयाय----6666 एसआरएसएसएस- चूि(cid:18)लयार म(cid:19) 400 केवी उडूमालपेट- ,थािपत -XI मडाकठारा के दोन^ स6कट का एलआईएलओ आं” .दशे म(cid:19) अवि,थत उ&पादन प(cid:10)रयोजनाए::ं:: उउउउDDDDपपपपााााददददनननन पपपप((((ररररययययोोोोजजजजननननााााएएएए ंंंं ििििववववववववररररणणणण िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथिििितततत तािलका संmय ा:::: एएएएससससआआआआरररर----एएएएपपपपीीीी----00001111/अअअअ;;;;ययययाााायययय----6666 Gसहा4ी टीपीएस एसटी-॥ Gसहा4ी एसटी॥ टीपीएस डी/सी पर 7/11 म(cid:19) ,थािपत (एनटीपीसी) (2x500 400 केवी डी/सी गजुवाका-वेमािगरी मेगावाट) (,थािपत) का एलआईएलओ तािलका संmय ा:::: एएएएससससआआआआरररर----एएएएपपपपीीीी ----00002222/अअअअ;;;;ययययाााायययय----6666 नागाजु(न सागर टीआर र(cid:19)ताGचताला 220/132 केवी 11/08 म(cid:19) ,थािपत एचईपी (2x25मेगावाट) एस/एस (12वd योजना म(cid:19) वीटीएस-तालाप(cid:18)ली 132 केवी 11/08 म(cid:19) ,थािपत ,थानांत(cid:10)रत) डी/सी लाइन-र(cid:19)ताGचताला का एलआईएलओ र(cid:19)ताGचताला-मचेरला एस/एस 132 ड(cid:4)(cid:18)यूआईपी केवी र(cid:19)ताGचताला-नागाजु(न सागर *लांट ड(cid:4)(cid:18)यूआईपी 132 केवी तािलका संmय ा:::: एएएएससससआआआआरररर----एएएएपपपपीीीी ----00003333/अअअअ;;;;ययययाााायययय----6666 ि.यदश(नी-जुराला एचईपी जुराला एचईपी-वेलतूर 220 केवी ,थािपत (6x39 मेगावाट) (,थािपत) डी/सी तािलका संmय ा:::: एएएएससससआआआआरररर----एएएएपपपपीीीी ----00004444/ अअअअ;;;;ययययाााायययय ----6666 काकितया (भूपलाप(cid:18)ली) भूपलाप(cid:18)ली-वारंगल 400 केवी 2/10 म(cid:19) ,थािपत टीपीएस-एसटी-। और ॥ डी/सी (1x500+ 1x600मेगावाट) भूपलाप(cid:18)ली-गजवाल 400 केवी काय( .गित म(cid:19) ह।ै (रा2य 8े9) (यू-1 ,थािपत) डी/सी626 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] तािलका संmय ा:::: एएएएससससआआआआरररर----एएएएपपपपीीीी ----00005555/ अअअअ;;;;ययययाााायययय ----6666 कोठागुदाम टीपीएस एसटी- कोठागुदाम टीपीएस – खDमम 3/11 म(cid:19) ,थािपत VI (500 मेगावाट) (,थािपत) 400केवी डी/सी कना(टक म(cid:19) अवि,थत उ&पादन प(cid:10)रयोजनाए::ं:: उउउउDDDDपपपपााााददददनननन पपपप((((ररररययययोोोोजजजजननननााााएएएए ंंंं ििििववववववववररररणणणण िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथिििितततत तािलका संmय ा:::: एएएएससससआआआआरररर----ककककेेेेएएएए----00001111/अअअअ;;;;ययययाााायययय----6666 उडुपी टीपीएस 1. यूटीपीएस-हसन (शांितSाम) ड(cid:4)(cid:18)यूआईपी आरओड(cid:4)(cid:18)य ू और कोट( केस। (यूपीसीएल), (2x600 400केवी डी/सी वन (172.53 ह(cid:25)े टेयर) और रेलवे ,वीकृित मेगावाट) (,थािपत) (6 जगह^ पर) आवiयक, चरण। ,वीकृित .ाr aआ। सीए चाज@ज जमा 7कए गए। 2. यूटीपीएस-नां7दकुर-खेमर 220केवी 10/09 म(cid:19) ,थािपत (आरंिभक िव!ुत के (अंशतः म(cid:18)टी स6कट म(cid:18)टी वो(cid:18)टेज िलए) टावर और अंशतः डी/सी टावर पर) तािलका संmय ा:::: एएएएससससआआआआरररर----ककककेेेेएएएए----00002222/अcयाय----6666 टोरंग(cid:18)लू Gजदल यू- 1. टोरंग(cid:18)लू जेएसड(cid:4)(cid:18)यू-गूटी 400केवी डी/सी लाइन 1,2 (2x300 2. थोरंग(cid:18)ल ू जेएसड(cid:4)(cid:18)यू एस/एस म(cid:19) ,थािपत मेगावाट) (िनजी 8े9) आरटीपीएस-गुXटूर का (,थािपत) एलआईएलओ तािलका संmय ा:::: एएएएससससआआआआरररर----ककककेेेेएएएए ----00003333/अcयाय----6666 बे(cid:18)लारी टीपीपी 1. बीटीपीएस 400केवी डी/सी पर ,थ ािपत (2x500 मेगावाट) आरटीपीएस-गुXटूर का (,थािपत) एलआईएलओ 2. बीटीपीएस-िह(cid:10)रयरु 400केवी डी/सी ,थ ािपत 3. बीटीपीएस पर Gलगापुर-अिलपुर का एलआईएलओ¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 627 तािलका संmय ा:::: एएएएससससआआआआरररर----ककककेेेेएएएए ----00004444/ अcयाय ----6666 कैगा एपीपी यू- 1. मैसूर-कोिजकोट 400 केवी डी/सी आरओड(cid:4)(cid:18)य ू सम,या 3,4(2x250मेगावाट) 2. नरे34-दवेनिगरी 400केवी डी/सी ,थािपत (,थािपत) लाइन 3. िह(cid:10)रयरु 400/220 केवी एस/एस ,थािपत 4. कोिजकोड ए(cid:25)सट(cid:19)शन 400/220 िनधा((cid:10)रत समयाविध के अनसु ार पूण( कV केवी एस/एस गयी। तिमलनाडु म(cid:19) अवि,थत उ&पादन प(cid:10)रयोजनाए::ं:: उउउउDDDDपपपपााााददददनननन पपपप((((ररररययययोोोोजजजजननननााााएएएए ंंंं ििििववववववववररररणणणण िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथिििितततत तािलका संmय ा:::: एएएएससससआआआआरररर----टटटटीीीीएएएएनननन----00001111/अअअअ;;;;ययययाााायययय----6666 व(cid:18)लूर टीपीएस जेवी 1. व(cid:18)लरू जेवी प(cid:10)रयोजना-एन सी टी पी एस रेलव े)ाGसग ,वीकृित तथा लाइन कV }Hटग के (एनटीपीसी-टीएनईबी एसटी ॥ 400 के वी डी/सी िलए सा(cid:18)ट किम£र स ेअनुमित आवiयक जेवी) (2x500 मेगावाट) 2. नॉथ ( चे›ई टीपीएस एसड(cid:4)(cid:18)यू याड ( 7/11 म(cid:19) ,थािपत (यू-1 ,थािपत, यू-2 पर अलामथी-†ीपेरंबदरु का 12वd योजना म(cid:19) एलआईएलओ ,थानांत(cid:10)रत) अअअअननननपपुुपपुु ररुुररुु कककक पपपपााााररररेेेेषषषषणणणण (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी वववव4444ललललररूूररूू टटटटीीीीपपपपीीीीएएएएसससस ककककेेेे ससससााााथथथथ ससससििििZZZZममममििििललललतततत 1. व(cid:18)लूर टीपीएस-मेलाकोKयूर इंजीिनयHरग .गित म(cid:19) 400केवी डी/सी 2. ितWवलम (पीजी)-िच`ूर 400केवी इंजीिनयHरग .गित म(cid:19) डी/सी तािलका संmय ा:::: एएएएससससआआआआरररर----टटटटीीीीएएएएनननन ----00002222/अअअअ;;;;ययययाााायययय----6666 नेवेली टीपीएस॥ 1. नेवेली टीएस-॥-पुगलुर 400केवी 8/09 म(cid:19) ,थािपत ए(cid:25)सट(cid:19)शन (एनएलसी) एस/सी (2x250 मेगावाट) (यू-1 2. पुगलुर-मदरु ई 400केवी डी/सी 3/09 म(cid:19) ,थािपत ,थािपत, यू-2 12वd 3. उदमु ालपेट-अरासुर 400केवी 7/10 म(cid:19) ,थािपत येाजना तक िखसक गई।) डी/सी 4. पांिडचेरी डी/सी म(cid:19) नेवेली- 10/10 म(cid:19) ,थािपत †ीपेरंबुदरु 400केवी एस/सी का एलआईएलओ628 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 5. वारंगल डी/सी म(cid:19) रामागुंडम-खमम 7/09 म(cid:19) ,थािपत 400केवी एस/सी का एलआईएलओ 6. नेवेली टीएस-॥ ए(cid:25)सट(cid:19)शन-नेवेली 9/09 म(cid:19) ,थािपत टीएस-॥ 400केवी 2xएस/सी 7. पुगलुर 400/230केवी एस/एस 3/09 म(cid:19) ,थािपत 8. वारंगल एस/एस400/230केवी आईसीटी-। और ॥ 7/09 म(cid:19) ,थािपत 9. अरासुर एस/एस 400/230केवी 7/10 म(cid:19) ,थािपत 10. पुदचु ेरी एस/एस 400/230केवी 10/10 म(cid:19) ,थािपत तािलका संmय ा:::: एएएएससससआआआआरररर----टटटटीीीीएएएएनननन----00003333/अअअअ;;;;ययययाााायययय----6666 कुडनकुलम एटािमक 1. कुडनकुलम-ितWनलवेली 400केवी पूण( कV गयी ,(cid:26)dGजग। जेन प(cid:10)रयोजना पीपी (2x100मेगावाट) डी/सी (cid:141)ाद .थम ,थापना म(cid:19) िवलंब के कारण ,थापना म(cid:19) (12वd योजना म(cid:19) 2. कुडनकुलम-ितWनलवेली 400केवी िवलंब aआ। ,थानांत(cid:10)रत) डी/सी (cid:141)ाद िuतीय 3. ितWनलवेली-उडुमालपेट 400केवी डी/सी 4. ितWनलवेली-एडामोन 400केवी एम/सी 5. एडामोन-मुव`ुपुझा 400केवी सव(र आरओड(cid:4)(cid:18)य ू सम,या के कारण डी/सी (cid:141)ाद ,वीकृित अिनZत। 6. मुव`ुपुझा-नाथ( ि9चुर 400केवी सव(र आरओड(cid:4)(cid:18)य ू सम,या का सामना डी/सी (cid:141)ाद aआ। 7. ितWनलवेली 2x डी/सी म(cid:19) मदरु ई- ,थािपत ि9व(cid:19)4म 400केवी डी/सी का एलआईएलओ 8. ितWनलवेली 400/220केवी आईसीटी-। 4/08 म(cid:19) ,थािपत एस/एस (2x315) आईसीटी-॥ 11/08 म(cid:19) ,थािपत 9. उडुमालपेट (पीजी) ए(cid:25)सट(cid:19)शन ,थािपत¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 629 10.मुव`ुपुझा 400/220केवी एस/एस आईसीटी। ,थापना के िलए तैयार तथा ॥ (2x315) आरंभ aई। *िनधा((cid:10)रत समयाविध के अनुसार पूण( कV गयी। 11.ि9व(cid:19)4म 400/220 केवी (1x315) ,थािपत तािलका संmय ा:::: एएएएससससआआआआरररर----टटटटीीीीएएएएनननन----00004444/अअअअ;;;;ययययाााायययय----6666 नाथ ( चे›ई ए(cid:25)सट(cid:19)शन 1. एनसीटीपीएस एसटी॥–आलामाथी 10 जगह^ पर आरओड(cid:4)(cid:18)य ू । कोट( केस टीपीएस (टीएनईबी), 400केवी एम/सी 2x600 मेगावाट (12वd 2. आलामाथी- सुंगुवरछ9म 400केवी 25 जगह^ पर आरओड(cid:4)(cid:18)यू। कोट( केस योजना तक िखसक गई) एम/सी 3. एनसीटीपीएस चरण॥ (आरंिभक 11/10 म(cid:19) ,थािपत िव!ुत के िलए के िलए) पर 230 केवी एनसीटीपीएस-मोसुर का एलआईएलओ तािलका संmय ा:::: एएएएससससआआआआरररर----टटटटीीीीएएएएनननन----00005555/अअअअ;;;;ययययाााायययय----6666 मेXटुर टीपीएस चरण ॥। 1. एमटीपीएस एसटी III -अरासुर ड(cid:4)(cid:18)यूआईपी (600 मेगावाट) यू-1 400केवी डी/सी (12वd योजना म(cid:19) 2. एमटीपीएस एसटी III -Gसगारपेट िनिवदा .वत(न होनी ह।ै ,थानांत(cid:10)रत) 400केवी 3. एमटीपीएस चरण III पर 230 एमटीपीएस चरण॥।- मालको एस/सी केवी एमटीपीएस-मालको का लाइन 2/11 आरंिभक िव!ुत के िलए एलआईएलओ आ व ेि श त 7कया गया। 4. केवी एमटीपीएस चरण III - ,थािपत प(cid:18)लकापलयम लाइन 5. 230 केवी एमटीपीएस चरण III - ,थािपत गोबी लाइन630 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] पपपपूवूवूवूवTTTT (cid:7)(cid:7)(cid:7)(cid:7)33ेे33ेे मममम (cid:27)(cid:27) (cid:27)(cid:27) (cid:30)(cid:30)(cid:30)(cid:30)णणणणााााललललीीीी ससससददुुददुु ढ़ढ़ढ़ढ़ृृृृ ीीीीककककररररणणणण ययययोोोोजजजजननननाााा :::: ययययोोोोजजजजननननाााा ििििववववववववररररणणणण िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथिििितततत तािलका संmय ा:::: ईआर----आआआआईईईईएएएएसससस----00001111/अअअअ;;;;ययययाााायययय----6666 पूवC 8े9 सुदढ़ृ ीकरण i) दगु ा(पुर-जमशेदपुर 400केवी डी/सी पूण( योजना-। लाइन ii) अंडल (दगु ा(पुर एसटीपीएस 1/11 म(cid:19) ,थािपत 400केवी डी/सी लाइन के आरंिभक िव!ुत के िलए) म(cid:19) एलआईएलओ के िलए दगु ा(पुर-जमशेदपुर पाट( लाइन iii) जमशेदपुर-बा(cid:10)रपादा 400केवी लाइन पूण ( aआ। डी/सी लाइन (iv)बा(cid:10)रपादा-म(cid:19)ढासल 400केवी ,थािपत डी/सी लाइन तािलका संmय ा:::: ईआर---- आआआआईईईईएएएएसससस ----00002222/अअअअ;;;;ययययाााायययय----6666 पूवC 8े9 सुदढ़ृ ीकरण दगु ा(पुर-मैथन 400केवी डी/सी लाइन लाइन पूण ( aआ। योजना- II तािलका संmय ा:::: ईआर---- आआआआईईईईएएएएसससस 00003333/ अअअअ;;;;ययययाााायययय ----6666 डीवीसी के आरंिभक 1. कोडरमा-िबहारशरीफ ((cid:141)ाद) 400 ,थािपत िव!ुत के िलए पारेषण केवी डी/सी .णाली और मैथन राइट 2. मैथन आरबी-मैथन (पीजी) लाइन परी8ण .भार 30.09.10 को aआ। बgक जेनरल प(cid:10)रयोजना 400केवी डी/सी 3. फतेहपुर म(cid:19) 220 केवी फतेहपुर लाइन पूण ( aआ। (यूपीपीसीएल) – कानपुर (यूपीपीसीएल) का एलआईएलओ 4. गया म(cid:19) 220केवी डी/सी डहे री- ,थािपत बोधगया लाइन का एलआईएलओ¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 631 पपपपिििि````मममम बबबबंगंगंगंगाााालललल मममम (cid:27)(cid:27) (cid:27)(cid:27)अअअअवववविििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथतततत उउउउDDDDपपपपााााददददनननन पपपप((((ररररययययोोोोजजजजननननााााएएएए:ंंंं उउउउDDDDपपपपााााददददनननन पपपप((((ररररययययोोोोजजजजननननााााएएएए ंंंं ििििववववववववररररणणणण िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथिििितततत ततततााााििििललललककककाााा ससससaaंंaaंं यय यय ाााा: ईईईईआआआआरररर-डडडड(cid:2)(cid:2)(cid:2)(cid:2)44 44 यय यय बबूूबबूू ीीीी----00001111/अअअअ;;;;ययययाााायययय----6666 ती,ता लो डमै IV ती,ता एलडी IV- 3यू जलपाईगुड़ी वन ,वीकृित .ाr aआ। समतल के 18 (एनएचपीएसी) (पैकेज-।) 220 केवी डी/सी + एस/सी जगह^ तथा पहाड़^ के बaत सारे जगह^ पर ड(cid:4)(cid:18)यूबी (4x40 (72.5+21 7कमी) सव(र आरओड(cid:4)(cid:18)य ू सम,या मेगावाट) (12वd योजना म(cid:19) ,थानांत(cid:10)रत) ततततााााििििललललककककाााा ससससaaंंaaंं यय यय ाााा: ईईईईआआआआरररर-डडडड(cid:2)(cid:2)(cid:2)(cid:2)44 44 यय यय बबूूबबूू ीीीी-00002222/अअअअ;;;;ययययाााायययय----6666 ती,ता लो डमै III ती,ता एलडी III - 3यू जलपाईगुड़ी वन ,वीकृित .ाr aआ। समतल के 18 (4x33 मेगावाट) (पैकेज II ) 220 केवी एस/सी जगह^ तथा पर सव(र आरओड(cid:4)(cid:18)य ू सम,या (12वd योजना म(cid:19) का सामना करना पड़ा। ,थानांत(cid:10)रत) ततततााााििििललललककककाााा ससससaaंंaaंं यय यय ाााा: ईईईईआआआआरररर-डडडड(cid:2)(cid:2)(cid:2)(cid:2)44 44 यय यय बबूूबबूू ीीीी----00003333/अअअअ;;;;ययययाााायययय----6666 मेिजआ टीपीएस 1. मेिजआ टीपीएस-मैथन (पीजी) 400 ,थािपत फेज-॥ (डीवीसी) केवी डी/सी 2x500मेगावाट 2. मेिजआ 400केवी डी/सी पर मैथन- (i) 2/10 म(cid:19) ,थािपत (,थािपत ) जमशेदपुर का एलआईएलओ (ii) यू 1 के िलए िनJ)मण सुिवधा उपल(cid:4)ध ततततााााििििललललककककाााा ससससaaंंaaंं यय यय ाााा: ईईईईआआआआरररर-डडडड(cid:2)(cid:2)(cid:2)(cid:2)44 44 यय यय बबूूबबूू ीीीी----00004444/अअअअ;;;;ययययाााायययय----6666 ददददगगगगुुुु ाााापप!!पप!! ररुुररुु टटटटीीीीपपपपीीीीएएएएसससस 1. दगु ा(पुर-जमशेदपुर 400 केवी डी/सी ईसीएल िव,थािपत माग (पर िनमा(ण कV अनुमित (डडडडीीीीववववीीीीससससीीीी) नहd द ेरहा ह,ै अंडल एयरपोट( के िनमा(ण के िलए 2x500 ममममेगेगेगेगााााववववााााटटटट अनुमती दी गई। एमओपी लेवेल पर मामल ेको (,थ ािपत) कोयला मं9ालय के साथ उठाया गया ह।ै 2. दगु ा(पुर टीपीएस 400 केवी डी/सी 1/11 म(cid:19) ,थ ािपत । पर दगु ा(पुर(पीजी) - जमशेदपुर (पीजी) का एलआईएलओ 3. दगु ा(पुर टीपीएस – रघुनाथपुर 400 10 जगह^ पर आरओड(cid:4)(cid:18)य ू सम,या। केवी डी/सी दामोदर नदी पर दो टावर^ के िलए नdव ।632 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ततततााााििििललललककककाााा ससससaaंंaaंं यय यय ाााा: ईईईईआआआआरररर-डडडड(cid:2)(cid:2)(cid:2)(cid:2)44 44 यय यय बबूूबबूू ीीीी----00005555/अअअअ;;;;ययययाााायययय----6666 संतलडीह टीपीपी संतलडीह-िबJणुपुर 220केवी डी/सी 16.618 ह(cid:25)े टेयर के िलए वन ,वीकृित (ड(cid:4)(cid:18)यूबीपीडीसीएल) सम,या । यू 5,6- (2x250 आसनसोल 220केवी पर संतलडीह- ,थ ािपत मेगावाट) (यू-5 दगु ा(पुर (। स6कट) का एलआईएलओ ,थ ािपत) िबJणुपुर म(cid:19) एसटीपीएस-आरामबाग ,थ ािपत 220केवी डी/सी का एलआईएलओ ततततााााििििललललककककाााा ससससaaंंaaंं यय यय ाााा: ईईईईआआआआरररर-डडडड(cid:2)(cid:2)(cid:2)(cid:2)44 44 यय यय बबूूबबूू ीीीी----00006666/अअअअ;;;;ययययाााायययय----6666 सगर7दघी - यूिनट-I 1. डी/सी लाइन पर सगर7दघी- ,थ ािपत & II (600 मेगावाट) पुWिलया (पीजी) 400 केवी (रा2य 8े9) एस/सी (,थ ािपत) झझझझााााररररखखखखंडंडंडंड मममम (cid:27)(cid:27) (cid:27)(cid:27) अअअअवववविििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथतततत उउउउDDDDपपपपााााददददनननन पपपप((((ररररययययोोोोजजजजननननााााएएएए:ंंंं उउउउDDDDपपपपााााददददनननन ििििववववववववररररणणणण िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथिििितततत पपपप((((ररररययययोोोोजजजजननननााााएएएए ंं ंं ततततााााििििललललककककाााा ससससaaंंaaंं यय यय ाााा:::: ईईईईआआआआरररर----जजजजआआेेआआेे रररर----00001111////अअअअ;;;;ययययाााायययय----6666 ककककोोोोडडडडररररममममाााा टटटटीीीीपपपपीीीीएएएएसससस 1. कोडरमा – िबहार शरीफ 400 केवी 5/11 म(cid:19) (cid:12)(cid:12)(cid:12)(cid:12)थथ थथ ााााििििपपपपतततत (डडडडीीीीववववीीीीससससीीीी) क्व ैद डी/सी . 2x500 ममममेगेगेगेगााााववववााााटटटट 2 . क ो ड र म ा - ग य ा 4 0 0 क ेव ी डी/सी * बa स6कट भाग को मैथन कोडरमा लाइन से गुजारकर मैथन-गया को कोडरमा-गया से (यूिनट-1 ,थ ािपत, जोड़ने के िलए आकि,मक ‡व,था कV गई । ययययििूूििूू ननननटटटट-3 12ववववEEEE 3. कोडरमा एसएस/ डी/सी पर (i) दोन^ स6कट 24 अग,त , 2010 को ययययोोोोजजजजननननाााा मममम (cid:27)(cid:27) (cid:27)(cid:27) 132केवी बरही - कोडरमा का ,थ ािपत (cid:12)(cid:12)(cid:12)(cid:12)थथ थथ ााााननननााााततंंततंं ((((ररररतततत) (ii) ,ट ाट(-अप पावर अब उपल(cid:4)ध एलआईएलओ ततततााााििििललललककककाााा ससससaaंंaaंं यय यय ाााा: ईईईईआआआआरररर----जजजजआआेेआआेे रररर----00002222/अअअअ;;;;ययययाााायययय----6666 ममममथथैैथथैै नननन 1. मैथन आरबीटीपी - मैथन (पीजी) लाइन परी8ण 30.9.10 को aआ। आआआआररररबबबबीीीीटटटटीीीीपपपपीीीीएस 400 केवी डी/सी (डडडडीीीीववववीीीीससससीीीी और टटटटााााटटटटाााा 2. मैथन आरबीटीपी - रांची (पीजी) ,थ ािपत ककककाााा ससससययंंययंं ::ुु::ुु तत तत उउउउ(cid:20)(cid:20)(cid:20)(cid:20)मममम) 400 केवी डी/सी (2x 525 ममममेगेगेगेगााााववववााााटटटट) (सथ ् ािपत)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 633 ििििबबबबहहहहाााारररर मममम (cid:27)(cid:27) (cid:27)(cid:27)अअअअवववविििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथतततत उउउउDDDDपपपपााााददददनननन पपपप((((ररररययययोोोोजजजजननननााााएएएए:ंंंं ततततााााििििललललककककाााा ससससaaंंaaंं यय यय ाााा: ईईईईआआआआरररर----बबबबीीीीआआआआरररर----00001111 बाढ़-I यूिनट1,2,3 6. बाढ़ म(cid:19) कहलगांव-पटना 400 केवी ,थ ािपत (1980 मेगावाट) डी/सी ((cid:25)व ैद) का एलआईएलओ (क(cid:19)4ीय 8े9) 7. बाढ़-बिलया 400 केवी डी/सी लाइन ,थ ािपत (12वd योजना से ((cid:25)व ैद) आगे बढ़ गई ह)ै 8. बिलया-िभवाड़ी 2500 मेगावाट एक पोल ,थ ािपत +500 केवी एचवीडीसी बाईपोल लाइन 9. िसवनी-बीना 765 केवी एस/सी ,थ ािपत लाइन 10.दो 66 केवी अथ( इले(cid:25)(cid:26) ोड लाइन (2 कंड(cid:25)ट र िXवन मोड) 11.बिलया , िसवनी, िभवाड़ी और बीना ,थ ािपत 400 केवी का िव,त ार. 12.बिलया और िभवाड़ी एचवीडीसी ड(cid:4)(cid:18)यूआईपी कंवट(र ,टेशन ममममघघेेघघेे ााााललललयययय मममम (cid:27)(cid:27) (cid:27)(cid:27) अअअअवववविििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथतततत उउउउDDDDपपपपााााददददनननन पपपप((((ररररययययोोोोजजजजननननााााएएएए::::ंंंं उउउउDDDDपपपपााााददददनननन पपपप((((ररररययययोोोोजजजजननननााााएएएए ंंंं ििििववववववववररररणणणण िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथिििितततत ततततााााििििललललककककाााा ससससaaंंaaंं यय यय ाााा: एएएएननननईईईईआआआआरररर----एएएएममममजजजजीीीी----00001111/अअअअ;;;;ययययाााायययय----6666 लेiका Gमटडु-। एचईपी (एमईएसईबी) लेiका Gमटडु- िmलयेह(cid:10)रयत 33केवी पर .भार (2x42+1x42 मेगावाट) (यू-1,2 132 केवी डी/सी ,थािपत, अित(cid:10)र‚ युिनट 12वd योजना म(cid:19) ,थानांत(cid:10)रत) अअअअततंंततंं (cid:7)(cid:7)(cid:7)(cid:7)33883388 ीीीीयययय पपपपााााररररेेेेषषषषणणणण ययययोोोोजजजजननननाााा :::: ततततााााििििललललककककाााा ससससaaंंaaंं यय यय ाााा: आआआआईईईईआआआआरररर----एसएस----00001111/अअअअ;;;;ययययाााायययय----6666 हहहह((((ररररतततत ििििववववववववररररणणणण िििि(cid:12)(cid:12)(cid:12)(cid:12)थथथथिििितततत पपपप((((ररररययययोोोोजजजजननननााााएएएए ंं ंं पूवC पिZमी 1 रांची-राउरकेला 400 केवी डी/सी 11/10 म(cid:19) ,थ ािपत पारेषण का(cid:10)रडोर 2 राउरकेला – रायगढ़ 400 केवी डी/सी 6/11 को परी8ण .भार aआ तथा 6/11 म(cid:19) सुदढ़ृ ीकरण ,थािपत। 3 रायगढ़ - रायपुर 400 केवी डी/सी 9/10 म(cid:19) ,थ ािपत ****************************************634 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4]634 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] अअअअ(cid:2)(cid:2)(cid:2)(cid:2)ययययाााायययय----7777 11112222वववव(cid:6)(cid:6)(cid:6)(cid:6) ययययोोोोजजजजननननाााा ककककेेेे ििििललललएएएए पपपपााााररररेेेेषषषषणणणण ककककाााायययय(cid:9)(cid:9)(cid:8)(cid:8)(cid:9)(cid:9)(cid:8)(cid:8) मममम 7777....1111 11112222वववव(cid:6)(cid:6)(cid:6)(cid:6) ययययोोोोजजजजननननाााा ककककेेेे ििििललललएएएए पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ककककाााा ििििववववककककाााासससस 7777....1111....1111 उ(cid:2)पादन िव(cid:9)तार काय(cid:14)(cid:15)म के अनुकूल िव(cid:17)ुत (cid:19)णाली अ(cid:24)ययन के आधार और उस योजना अविध के अंत म(cid:25) पूवा(cid:14)नुमािनत मांग प(cid:27)रद(cid:29)ृ य के आधार पर योजना अविध के िलए पारेषण िव(cid:9)तार आव(cid:29)यकता(cid:31) क पहचान क जाती ह,ै िजसके आधार पर योजनाए ं िवकिसत क जाती ह " और समय-समय पर उ(cid:2)पादन काय(cid:14)(cid:15)म म(cid:25) #ए प(cid:27)रवत(cid:14)न% को (cid:24)यान म(cid:25) रखकर पुनः योजनाए ं बनाई हाती ह," उन पर िवचार-िवमश(cid:14) 'कया जाता ह ै और उ(ह (cid:25) अंितम )प 'दया जाता ह।ै योजना के दौरान वा*षक आधार पर उ(cid:2)पादन ,मता वृि- और भार वृि- काय(cid:14)(cid:15)म के अनुकूल काया(cid:14)ि(वत 'कए जाने वाले प(cid:27)रयोजना(cid:31), योजना(cid:31) और पारेषण त(cid:2)व% क पहचान को (cid:24)यान म(cid:25) रखत े #ए काया(cid:14)(वयन काय(cid:14)(cid:15)म को तदनुसार लागू 'कया जाता ह।ै पारेषण नेटवक(cid:14) के सामियक िवकास के िलए िवशेष उ(cid:2)पादन प(cid:27)रयोजना(cid:31) के अनु)प िविश2 पारेषण योजना(cid:31) का सुदढ़ृ ीकरण आव(cid:29)यक ह,ै िवशेष )प से अंतर-रा3य पारेषण (cid:19)णाली के संदभ (cid:14) म(cid:25) यह काय(cid:14) पूण(cid:14) कर करन े क िनधा(cid:14)(cid:27)रत तारीख के बाद 3-5 वष(cid:14) के अंदर 'कया जाना चािहए। 7777....1111....2222 इन आव(cid:29)यकता(cid:31) को पूरा करन े वाले 12व8 योजना क अिधकतर येाजना(cid:31) क पहचान कर ली गई ह ै और इस पर िव(cid:17)ुत (cid:19)णाली योजना के ,े9ीय (cid:9)थायी सिमितय% म(cid:25) िवचार-िवमश(cid:14) 'कया गया, उसे अंितम )प 'दया गया, योजना तैयार क गई और काया(cid:14)(वयन क (cid:19)'(cid:15)या शु) कर दी गई। िचि(हत योजना(cid:31) म (cid:25) से अिधकतर का िनमा(cid:14)ण काय(cid:14) चल रहा ह,ै िवशेषकर वे योजनाए ं िज(ह (cid:25) 12व8 योजना के उ<राध (cid:14) म(cid:25) पूरा 'कए जान े क आव(cid:29)यकता ह।ै 7777....2222 अअअअततंंततंं रररर----(cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ीीीीयययय पपपपााााररररेेेेषषषषणणणण (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााा ककककाााायययय(cid:9)(cid:9)(cid:8)(cid:8)(cid:9)(cid:9)(cid:8)(cid:8) मममम 7777....2222....1111 रा=ीय ि>ड क अंतर-,े9ीय पारेषण ,मता ,े9ीय ि>ड क आपसी ,मता का (cid:19)दश(cid:14)न करती ह।ै 10व8 योजना के अंत म(cid:25) अिखल भारतीय ि>ड क अंतर-,े9ीय पारेषण ,मता 14050 मेगावाट थी। 11व8 योजना के दौरान 31-03-12 तक कुल अंतर ,े9ीय पारेषण ,मता (132 केवी और इससे अिधक वो@टेज (cid:9)तर पर) म(cid:25) 13900 मेगावाट ,मता क वृि- करत े #ए इस 27750 मेगावाट तक प#चं ाया गया ह।ै [ इसम(cid:25) शािमल ह " (i) 2100 मेगावाट का गया-बिलया 765 केवी एस/सी लाइन िजस े 400 केवी क आकि(cid:9)मक Bव(cid:9)था के साथ शु) 'कया गया और (ii) 2100 मेगावाट सासाराम-फतेहपुर 765 केवी एस/सी लाइन िजसे गया-फतेहपुर लाइन के )प म(cid:25) 765 केवी के साथ शु) 'कया गया। इसम(cid:25) बुरसुर- ] लोअर िसले) एचवीडीसी मोनोपोल शािमल नह8 ह ै जो 'क (cid:19)चालनरत नह8 है । 7777....2222....2222 12व8 योजना अविध के दौरान उ(cid:2)पादन प(cid:27)रयोजना स े संबिधत अथवा (cid:19)णाली सुदढ़ृ ीकरण योजना(cid:31) के )प म(cid:25) ब#त सारे अंतर ,े9ीय पारेषण Dलक योिजत 'कए गए ह।" इन Dलक का काया(cid:14)(वयन संबंिधत उ(cid:2)पादन क(cid:25)F% क (cid:19)गित पर िनभ(cid:14)र होगा । 12व8 योजना के िलए 84 गीगा वाट उ(cid:2)पादन वृि- प(cid:27)रद(cid:29)ृ य को दखे ते #ए 12व8 योजना अविध/शुHआती 13व8 योजना अविध के दौरान लगभग 44000 मेगावाट को अंतर-,े9ीय पारेषण Dलक क वृि- क जाए। इस (cid:19)कार 12व8 योजना/शुHआती 13व8 योजना के अंत म(cid:25)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 635 अंतर-,े9ीय पारेषण ,मता 72000 मेगावाट रहन े का अनुमान ह।ै िववरण सारणी म(cid:25) दी गई हःै (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ककककाााा ननननाााामममम 11111111वववव(cid:6)(cid:6)(cid:6)(cid:6) 11112222वववव(cid:6)(cid:6)(cid:6)(cid:6) 11112222वववव(cid:6)(cid:6)(cid:6)(cid:6) ययययोोोोजजजजननननाााा ककककेेेे ययययोोोोजजजजननननाााा//// ययययोोोोजजजजननननाााा//// ((((ससससभभभभीीीी आआआआककंंककंं ड़ड़ड़ड़ ेे ेे ममममगगेेगगेे ााााववववााााटटटट मममम (cid:19)(cid:19) (cid:19)(cid:19) (cid:20)(cid:20)(cid:20)(cid:20)ददददएएएए गगगगएएएए हहहह))(cid:24)(cid:24)))(cid:24)(cid:24) अअअअततंंततंं मममम (cid:19)(cid:19) (cid:19)(cid:19) शशशशु(cid:27)ु(cid:27)ु(cid:27)ु(cid:27)आआआआततततीीीी शशशशु(cid:27)ु(cid:27)ु(cid:27)ु(cid:27)आआआआततततीीीी 11113333वववव(cid:6)(cid:6)(cid:6)(cid:6) 11113333वववव(cid:6)(cid:6)(cid:6)(cid:6) ययययोोोोजजजजननननाााा ययययोोोोजजजजननननाााा ककककेेेे ककककेेेे अअअअततंंततंं मममम(cid:19)(cid:19) (cid:19)(cid:19) ििििललललएएएए ययययोोोोजजजजननननाााा अअअअननननममुुममुु ााााििििननननतततत ईईईईआआआआरररर –––– एएएएससससआआआआरररर :::: गाजुवाका एचवीडीसी बैक टू बैक 1000 1000 बालीमेला अपर िसले) 220 केवी एस/सी 130 130 तालचर-कोलर एचवीडीसी बाइपोल 2000 2000 तालचर-कोलर एचवीडीसी बाइपोल का उIयन 500 500 ककककुुुुलललल ईईईईआआआआरररर----एएएएससससआआआआरररर 3333666633330000 3333666633330000 ईईईईआआआआरररर----एएएएननननआआआआरररर:::: ) मुजJफरपुर-गोरखपुर 400केवी डी/सी (Lाडमुज 2000 2000 टीसीएससी के साथ डहे री-साMपुरी 220केवी एस/सी 130 130 पटना-बिलया 400 केवी डी/सी Lाड 1600 1600 िबहारशरीफ-बिलया 400 केवी डी/सी Lाड 1600 1600 बाढ़-बिलया 400 केवी डी/सी (cid:29)(cid:29)(cid:29)(cid:29)ााााडडडड # 1600 1600 गया-बिलया 765 केवी एस/सी(12व8 योजना म(cid:25) वाराणसी * 2100 2100 म(cid:25) एलआईएलओईडी) सासाराम-इलाहाबाद/वाराणसी 400केवी/ डीसी लाइन 1000 1000 (सासाराम एचवीडीसी बैक टू बैक को बाइपास 'कया गया ) है गया-वाराणसी 765 केवी एस/सी 2100 2100 सासाराम-फतेहपुर 765 केवी एस/सी लाइन #1 # # 2 1 0 0 2100 बाढ़-गोरखपुर 400 केवी डी/सी (cid:29)(cid:29)(cid:29)(cid:29)ााााडडडड 1600 1600 सासाराम-फतेहपुर 765 केवी एस/सी लाइन #2 2100 2100 ककककुुुुलललल ईईईईआआआआरररर----एएएएननननआआआआरररर 11112222111133330000 5555888800000000 11117777999933330000636 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ईईईईआआआआरररर----डडडड(cid:31)(cid:31)(cid:31)(cid:31) ययययआआूूआआूू रररर :::: राउरकेला-रायपुर 400 केवी/डीसी 1000 1000 राउरकेला-रायपुर 400 केवी/डीसी पर टीसीएससी 400 400 बुिधपारा-कोरबा 220केवी डी/सी+ एस/सी 390 390 रांची-िसपत 400 केवी डी/सी (40% एससी ) 1200 1200 िनधा(cid:14)(cid:27)रत सी(cid:27)रज कैपेसीटर, पैरलेल लाइन म(cid:25) टीसीएससी के 1400 1400 साथ रांची-राउरकेला-रायगढ़-रायपुर 400 केवी डी/सी 12व8 योजना के दौरान धरमजयगढ़ के मा(cid:24)यम से रांची- 2100 2100 डN@यूआर (िबलासपुर) िसपत पुDलग Oवाइंट 765 केवी एस/सी रांची-धरमजयगढ़ 765 केवी एस/सी 2100 2100 झारसुगुडा-धरमजयगढ़ 765 केवी डी/सी 4200 4200 ककककुुुुलललल ईईईईआआआआरररर----डडडड(cid:31)(cid:31)(cid:31)(cid:31) ययययआआूूआआूू रररर 4444333399990000 8888444400000000 11112222777799990000 ईईईईआआआआरररर----एएएएननननईईईईआआआआरररर : बीरपारा-सलाकाटी 220 केवी डी/सी 260 260 मालछा-ब%गाइगांव 400केवी डी/सी 1000 1000 12व8/13व8 योजना म(cid:25) अिलपुरPार म(cid:25) एलआईएलओईडी 1600 1600 'कया जानेवाला ब%गाइगांव-िसिलगुड़ी 400केवी डी/सी Lाड ककककुुुुलललल ईईईईआआआआरररर----एएएएननननईईईईआआआआरररर 1111222266660000 1111666600000000 2222888866660000 एएएएननननआआआआरररर----डडडड(cid:31)(cid:31)(cid:31)(cid:31) ययययआआूूआआूू रररर:::: Dव(cid:24)याचल एचवीडीसी बैक टू बैक 500 500 औ(cid:27)रया-मालनपुर 220केवी डी/सी 260 260 कोटा-उRैन 220केवी डी/सी 260 260 765 केवी पर आगरा-Tवािलयर 765 केवी एस/सी लाइन-1 1100 1000 2100 (पहले 400 केवी पर) 765 केवी पर आगरा-Tवािलयर 765 केवी एस/सी लाइन-2 1100 1000 2100 (पहले 400 केवी पर)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 637 कां(cid:15)ोली- जेदा(cid:14) 400केवी डी/सी 1000 1000 Tवािलयर-जयपुर 765केवी एस/सी#1 2100 2100 Tवािलयर-जयपुर 765केवी एस/सी#2 2100 2100 आरएपीपी सी एUड डी-शुजालपुर 400केवी डी/सी 1000 1000 चंपा-कु),े9+/-800केवी 6000 मेगावाट एचवीडीसी 3000 3000 बाइपोल लाइन, फेज-1 ककककुुुुलललल एएएएननननआआआआरररर----डडडड(cid:31)(cid:31)(cid:31)(cid:31) ययययआआूूआआूू रररर 4444222222220000 11110000222200000000 11114444444422220000 डडडड(cid:31)(cid:31)(cid:31)(cid:31) ययययआआूूआआूू रररर----एएएएससससआआआआरररर :::: चंFपुर एचवीडीसी बैक टू बैक 1000 1000 बुरसुर-एल िसले) 200केवी एचवीडीसी मोनोपोल @ -- -- को@हापुर-बेलगाम 220केवी डी/सी 260 260 प%डा-नागाझाड़ी 220केवी डी/सी 260 260 नर(cid:25)F (जीआईएस)765केवी डी/सी लाइन (शु) म(cid:25) 400 केवी 2200 2200 पर चाज (cid:14) 'कया गया) रायचुर-शोलापुर 765केवीएस/सी #1 2100 2100 रायचुर-शोलापुर 765केवी एस/सी #2 2100 2100 ककककुुुुलललल डडडड(cid:31)(cid:31)(cid:31)(cid:31) ययययआआूूआआूू रररर----एएएएससससआआआआरररर 1111555522220000 6666444400000000 7777999922220000 एएएएननननईईईईआआआआरररर////ईईईईआआआआरररर ////डडडड(cid:31)(cid:31)(cid:31)(cid:31) ययययआआूूआआूू रररर:::: िवVनाथ च(cid:27)रयाली–आगरा +800 केवी, 3000 मेगावाट 3000 3000 एचवीडीसी बाइपोल अिलपुरPार के नए पुDलग क(cid:25)F पर + 800केवी िवVनाथ 3000 3000 च(cid:27)रयाली–आगरा एचवीडीसी बाइपपोल का एलआईएलओ और 3000 मेगावाट एचवीडीसी क वृि- ककककुुुुलललल एएएएननननईईईईआआआआरररर////ईईईईआआआआरररर ////डडडड(cid:31)(cid:31)(cid:31)(cid:31) ययययआआूूआआूू रररर 0000 6666000000000000 6666000000000000 ससससपपंंपपंं ूणूणूणूण (cid:8)(cid:8) (cid:8)(cid:8)अअअअििििखखखखलललल भभभभााााररररतततत 22227777111155550000 33338888444400000000 66665555555555550000 ((((222222220000ककककेेेेववववीीीी औऔऔऔरररर उउउउसससससससस ेे ेे&&&&ययययााााददददाााा)))) 132केवी/110केवी अंत,W9ीय Dलक $ 600 (-600) ----638 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] (12व8 योजना म(cid:25) शािमल न 'कया जाने वाला) ससससपपंंपपंं ूणूणूणूण (cid:8)(cid:8) (cid:8)(cid:8)अअअअििििखखखखलललल भभभभााााररररतततत 22227777777755550000 33337777888800000000 66665555555555550000 ननननोोोोटटटट:::: @ - 200 मेगावाट एचवीडीसी मोनोपोल वत(cid:14)मान म(cid:25) (cid:19)चालनरत नह8 ह।ै $ - समय-समय पर 132/110केवी लाइन रेिडयल मोड म(cid:25) (cid:19)चािलत 'कया जाता ह।ै (12व8 योजना म(cid:25) शािमल न 'कया जान े वाला) # - बाढ़-बिलया लाइन को पूरा कर िलया गया ह ै ले'कन अभी इसका उXाटन नह8 #आ ह।ै *- 400केवी क आकि(cid:9)मक Bव(cid:9)था के साथ गया-बिलया 765केवी एस/सीलाइन का उXाटन हो गया ह।ै ## - गया-फतेहपुर लाइन क तरह 765केवी (cid:9)तर के सासाराम-फतेहपुर लाइन का उXाटन हो गया ह।ै िविभI ,े9% के बीच आई-आर पारेषण ,मता वृि- का सारांश नीच े 'दया गया ह:ै ((((ससससभभभभीीीी आआआआककंंककंं ड़ड़ड़ड़ ेे ेे ममममेगेगेगेगााााववववााााटटटट मममम (cid:19)(cid:19) (cid:19)(cid:19) (cid:20)(cid:20)(cid:20)(cid:20)ददददएएएए गगगगएएएए हहहह))(cid:24)(cid:24)))(cid:24)(cid:24) (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे '''' ककककेेेे बबबबीीीीचचचच आआआआईईईई----आआआआरररर 11110000वववव(cid:6)(cid:6)(cid:6)(cid:6) ययययोोोोजजजजननननाााा 11111111वववव(cid:6)(cid:6)(cid:6)(cid:6) ययययोोोोजजजजननननाााा 11112222वववव(cid:6)(cid:6)(cid:6)(cid:6) 11112222वववव(cid:6)(cid:6)(cid:6)(cid:6) ययययोोोोजजजजननननाााा ककककेेेे पपपपााााररररेेेेषषषषणणणण (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााा ककककेेेे अअअअततंंततंं मममम(cid:19)(cid:19) (cid:19)(cid:19) ककककेेेे अअअअतततत मममम(cid:19)(cid:19) (cid:19)(cid:19) ययययोोोोजजजजननननाााा////शशशशु(cid:27)ु(cid:27)ु(cid:27)ु(cid:27)आआआआततततीीीी अअअअततंंततंं मममम (cid:19)(cid:19) (cid:19)(cid:19) ////11113333वववव(cid:6)(cid:6)(cid:6)(cid:6) उउउउपपपपलललल(cid:31)(cid:31)(cid:31)(cid:31)धधधध उउउउपपपपलललल(cid:31)(cid:31)(cid:31)(cid:31)धधधध 11113333वववव(cid:6)(cid:6)(cid:6)(cid:6) ययययोोोोजजजजननननाााा ककककेेेे ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन ववववििृृििृृ ++++ शशशश,,ुु,,ुु आआआआतततत मममम (cid:19)(cid:19) (cid:19)(cid:19) अअअअननननममुुममुु ाााानननन ईआर-एसआर 3130 3630 - 3630 ईआर-एनआर 3430 12130 5800 17930 ईआर-डN@यूआर 1790 4390 8400 12790 ईआर-एनईआर 1260 1260 1600 2860 एनआर-डN@यूआर 2120 4220 10200 14420 डN@यूआर-एसआर 1720 1520 6400 7920 एनईआर/ईआर- 0 0 6000 6000 एनआर/डN@यूआर 132/110केवी रेिडयल Dलक 600 600 (-600) 0 ससससपपंंपपंं ूणूणूणूण (cid:8)(cid:8) (cid:8)(cid:8)अअअअििििखखखखलललल भभभभााााररररतततत 11114444000055550000 22227777777755550000 33337777888800000000 66665555555555550000¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 639 Inter-Regional Transmisison Capacity, MW . 70000 NER/ER - NR/WR 60000 WR-SR ER-SR ER-NR 50000 ER-WR ER-NER NR-WR WR-SR NR-WR NER/ER - NR/WR 40000 ER-NER 30000 ER-WR WR-SR NR-WR 20000 ER-NER ER-WR ER-NR WR-SR 10000 NR-WR ER-NER ER-NR ER-WR ER-NR ER-SR ER-SR ER-SR 0 Existing at end of X Plan Expected at the end of XI Plan Expected at end of XII Plan 7777....2222....4444 ददददोोोो (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे '''' ककककेेेे बबबबीीीीचचचच अअअअततंंततंं रररर----(cid:15)(cid:15)(cid:15)(cid:15)े(cid:17)े(cid:17)े(cid:17)े(cid:17)ीीीीयययय ----ललललकककक औऔऔऔरररर अअअअततंंततंं ररररणणणण (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााा कककक.... पपपपााााररररेेेेषषषषणणणण (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााा अंतर-,े9ीय Dलक क पारेषण ,मता का संकलन दो ,े9% के बीच के संबंध% का (cid:19)तीका(cid:2)मक (cid:19)(cid:9)तुतीकरण ह।ै ये समुYय संZया िविभI ,े9%/रा3य% क वा(cid:9)तिवक अंतरण ,मता को नह8 दशा(cid:14)ते ह।" ि>ड म(cid:25) 'कसी दो Dबद(cid:31)ु के बीच िव(cid:17)ुत अंतरण ,मता लोड (cid:19)वाह प-ित, वो@टेज ि(cid:9)थरता, एगं ुलर ि(cid:9)थरता, लूप Jलो और ि>ड म(cid:25) सबस े कमजोर Dलक के लाइन लोDडग जैस े ब#त सारे कारक% पर िनभ(cid:14)र होता ह।ै उदाहरण के िलए वत(cid:14)मान म(cid:25) उ<र ,े9 का संकिलत अंतर-,े9ीय पारेषण ,मता 16350 मेगावाट ह(ै ईआरके साथ 12130 मेगावाट और डN@यूआर के साथ 4220 मेगावाट) जबक (cid:19)चालना(cid:2)मक ि(cid:9)थितय% पर आधा(cid:27)रत एनआर का समकािलक अंतरण आयात ,मता लगभग 6000-7000 मेगावाट ह।ै (cid:19)णाली (cid:19)चालक को समय-समय पर ि>ड के दो Dबद(cid:31)ु के बीच अंतरण ,मता का मू@यांकन करना पड़ता ह ै और तदनुसार िव(cid:17)ुत (cid:19)वाह को सीिमत करना पड़ता ह।ै 7777....3333 11112222वववव(cid:6)(cid:6)(cid:6)(cid:6) ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ककककाााा ििििववववककककाााासससस ---- (cid:11)(cid:11)(cid:11)(cid:11)िििितततत////पपपपधधधध0000 बबबबोोोोललललीीीी ककककेेेे ममममाााा(cid:2)(cid:2)(cid:2)(cid:2)ययययमममम सससस ेे ेे ककककााााययययाााा11(cid:8)(cid:8)11(cid:8)(cid:8) ववववययययनननन यह नोट 'कया जाए 'क 12व8 येाजना के िलए िचि(हत प(cid:27)रयोजना(cid:31) के िलए पारेषण योजना तैयार क जा चुक ह,ै िव(cid:17)ुत (cid:19)णाली येाजना हते ु (cid:9)थायी सिमित म(cid:25) रखा गया ह ै और 5 जनवरी 2011 क िनधा(cid:14)(cid:27)रत ितिथ से पहले आईएसटीएस को लंबी अविध के िलए पारेषण प#चं उपलNध करान े हते ु नोडल एज(cid:25)सी के )प म(cid:25) सीटीयू के साथ पारेषण सहमित करार (बीपीटीए) पर ह(cid:9)ता,र 'कया गया ह।ै इसिलए, अिधकतर आईएसटीएस योजना(cid:31) को स(cid:25)[ल से\टर योजना(cid:31) के )प म(cid:25) पावरि>ड Pारा काया(cid:14)ि(वत 'कया जाएगा। इसके अलावा, अंतर-रा3यीय उ(cid:2)पादन क(cid:25)F% से सम*पत पारेषण लाइन का िनमा(cid:14)ण अिधकतर उ(cid:2)पादन िवकासकता(cid:14)(cid:31) Pारा िनजी ,े9 लाइन के )प म(cid:25) 'कया जाएगा। (cid:19)ित(cid:9)पध] बोली के मा(cid:24)यम स े आईएसटीएस िवकिसत करने के िलए अिधकार(cid:19)ा^ सिमित के िनदशW के अंतग(cid:14)त कुछ योजनाए ं िचि(हत क गई ह " और वे काया(cid:14)(वयन के िविभI चरण% म(cid:25) ह।" इसे 12व8 योजना के दौरान मूत(cid:14) )प 'दया जाएगा।640 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] इसके अलावा, कुछ अपवाद% को छोड़कर (cid:19)णाली सुदढ़ृ ीकरण, रा3य Pारा िव(cid:17)ुत के उपयोग और भिव_य म(cid:25) िचि(हत 'कया जानेवाला िव(cid:17)ुत हटाने के िलए आव(cid:29)यक नई येाजना(cid:31) को जहा ं तक संभव हो बोली (cid:19)'(cid:15)या के मा(cid:24)यम स े काया(cid:14)ि(वत 'कया जाएगा। (cid:19)ित(cid:9)पध] बोली म(cid:25) पावरि>ड भी भाग लेगा। इसी तरह रा3य ,े9 म(cid:25) भी संभावना ह ै 'क 12व8 योजना के दौरान अिधकतर योजना(cid:31) को एसटीयू Pारा काया(cid:14)िनवत 'कया जाएगा । 7777....4444 11112222वववव(cid:6)(cid:6)(cid:6)(cid:6) ययययोोोोजजजजननननाााा अअअअववववििििधधधध एएएएवववव ंं ंंउउउउससससककककेेेे बबबबाााादददद ककककेेेे ििििललललएएएए ययययोोोोििििजजजजतततत पपपपााााररररेेेेषषषषणणणण ययययोोोोजजजजननननााााएएएए ंं ंं 7777....4444....1111 ससससममममिििि1111ववववतततत ययययोोोोजजजजननननाााा (cid:11)(cid:11)(cid:11)(cid:11)(cid:20)(cid:20)(cid:20)(cid:20)(cid:9)(cid:9)(cid:9)(cid:9)ययययाााा कककक(cid:19)(cid:19)(cid:19)(cid:19)3333ीीीीयययय पपपपााााररररेेेेषषषषणणणण ककककंंंंपपपपििििननननयययय'''', रररराााा&&&&यय यय पपपपााााररररेेेेषषषषणणणण ककककंंंंपपपपििििननननयययय'''' और ,े9ीय िव(cid:17)ुत सिमितय% के साथ सम(वय कर सीईए ने िन`िलिखत के िलए पारेषण (cid:19)णािलयां योिजत क ह " –(i) होराइजन म(cid:25) मौजूद िविभI उ(cid:2)पादन प(cid:27)रयोजना(cid:31) से िव(cid:17)ुत हटाना, और (ii) 12व8 और शुHआती 13व8 योजना अविध के िलए आव(cid:29)यक ,े9ीय और अंतर-,े9ीय पारेषण नेटवक(cid:14) के सुदढ़ृ ीकरण के िलए आव(cid:29)यक पारेषण (cid:19)णािलयां। िव(cid:17)ुत हटान े और ि>ड के सुदढ़ृ ीकरण के िलए योिजत ऐसी सभी योिजत योजना(cid:31) का िववरण नीचे 'दया गया ह।ै ऐसी अिधकतर योजनाए ं तैयार ह " तथािप इसम(cid:25) ऐसी योजनाए ं भी ह " जो अभी तैयार नह8 ह " जो 'क संबंिधत उ(cid:2)पादन प(cid:27)रयोजना क (cid:19)गित पर िनभ(cid:14)र ह।" इन येाजना(cid:31) म(cid:25) मुZयतः 400 केवी और इसस े अिधक क पारेषण (cid:19)णाली शािमल ह।ै 7777....4444....2222 ललललबबंंबबंं ीीीी अअअअववववििििधधधध पपपप(cid:2)(cid:2)(cid:2)(cid:2)चचंंचचंं ((((एएएएललललटटटटीीीीएएएए)))) (cid:5)(cid:5)(cid:5)(cid:5)(cid:6)(cid:6)(cid:6)(cid:6)(cid:7)(cid:7)(cid:7)(cid:7)ययययाााा समि(वत योजना (cid:19)'(cid:15)या के भाग के )प म(cid:25) आईएसटीएस म(cid:25) एलटीए क मंजूरी के िलए आव(cid:29)यक पारेषण वृि- क भी योजना बनाई गई ह।ै अंतर-रा3यीय पारेषण (cid:19)णाली का एलटीए क(cid:25)Fीय िनयामक आयोग के िविनयम% Pारा अिधशािसत होता ह।ै लंबी अविध क प#चं (एलटीए) उपलNध करान े के िलए क(cid:25)Fीय पारेषण कंपिनय% (सीटीयू) नोडल एज(cid:25)सी ह ै िजसम (cid:25) (cid:19)तीका(cid:2)मक )प से पारेषण योजना (cid:19)'(cid:15)या के मा(cid:24)यम से पारेषण म(cid:25) वृि- शािमल ह।ै लंबी अविध क प#चं के िलए िव(cid:17)ुत उ(cid:2)पादक के (cid:19)योग पर आधा(cid:27)रत पारेषण (cid:19)णाली उ(cid:2)पादन क(cid:25)F स े िव(cid:17)ुत हटान े के िलए योिजत ह।ै चूं'क लंबी अविध प#चं म(cid:25) सामा(यतया आईएसटीएस का सुदढ़ृ ीकरण शािमल होता ह ै िजसक पहचान पारेषण योजना Pारा तया क जाती ह,ै इसके िलए आव(cid:29)यक कुछ मूलभूत इनपुट ह-" (i) उ(cid:2)पादन योजना ,मता, (ii) इसक अवि(cid:9)थित, (iii) काया(cid:14)(वयन क समय-सीमा और (iv) लाभाथ] िज(ह (cid:25) िव(cid:17)ुत उपलNध कराया जाएगा। तथािप, वत(cid:14)मान प(cid:27)रि(cid:9)थित म(cid:25) इनम(cid:25) से कोई इनपुट िनिdतता के साथ उपलNध नह8 ह।ै ऐसी ि(cid:9)थित म(cid:25) यह (cid:9)प2 ह ै 'क पारेषण करन े वाले Bापक लeय क पू*त सुिनिdत करने के िलए कुछ अिभनव रणनीितय% का पालन करत े ह," िजसस े यह सुिनिdत 'कया जाता ह ै 'क (i) पारेषण आव(cid:29)यकता क पू*त के िलए पारेषण िवकास 'कया जाता ह,ै (ii) िव(cid:17)ुत क आपू*त को नह8 रोका जाता ह,ै (iii) उ(cid:2)पादन और पारेषण के बेमेल को रोका जाता ह,ै (iv) य'द ि>ड के 'कसी भाग म(cid:25) संकुलन पाया जाता ह ै तो उसे ज@द से ज@द दरू 'कया जाए इ(cid:2)या'द। इसको दखे ते #ए अिधक ,मता वाली पारेषण (cid:19)णाली िवकिसत करना एक चुनौती बन जाती ह ै और य'द एक बार योजना बन जाती ह ै तो इसका काया(cid:14)(वयन भी उतना ही चुनौतीपूण(cid:14) होता ह ै ता'क उ(cid:2)पादन प(cid:27)रयोजना और पारेषण (cid:19)णाली के िवकास के बेमेल को हटाया या रोका जा सके।¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 641 7777....4444....3333 पपपपााााररररेेेेषषषषणणणण ससससककंंककंं ुुुुललललनननन सामा(यतया जहा ं एलटीए के िलए आवेदन के समय लाभा*थय% को भी िविनgद2 'कया गया ह ै वहां एलटीए के अंतग(cid:14)त िव(cid:17)ुत अंतरण म(cid:25) कोई संकुलन नह8 होता ह।ै तथािप, अ@पाविध/म(cid:24)याविध िव(cid:17)ुत अंतरण म(cid:25) संकुलन हो जाता ह।ै (cid:9)व-िनपटान त(cid:2)व के )प म(cid:25) िवतरण उपयोिगताएं अपने मौसमी मांग क पू*त करन े हते ु अथवा अपने मौसमी अिधशेष क पू*त हते ु मौसमी Bापार करत े ह " िजसस े 'क मांग और आपू*त के बीच संतुलन बना रह े और आकि(cid:9)मक आव(cid:29)यकता(cid:31) को पूरा 'कया जा सके। भारत म(cid:25), अ@पा- विध Bापार क प-ित अिनयिमत ह ै और यह ब#त सारे बाh कारण% िवशेषकर घाटे के डीआईएससीओएमएस इ(cid:2)या'द के साथ िनिधय% क उपलNधता पर आधा(cid:27)रत होता ह।ै कभी कोई रा3य अचानक से भार घटाने का िनण(cid:14)य ले सकता ह ै और Bापार के मा(cid:24)यम स े भारी मा9ा म(cid:25) अ@पाविध खरीददारी कर सकता ह।ै ऐसी ि(cid:9)थित म(cid:25) वापसी का मौजूदा पारेषण ,मता म(cid:25) उपलNध मा*जन तक सीिमत रखना होगा। ऐसी ि(cid:9)थित/संभाBता के अनुकूल पारेषण (cid:19)णाली को योिजत करना संभव नह8 ह।ै सामा(यतया िवV के सभी िवकिसत िव(cid:17)ुत बाजार% म(cid:25) संकुलन रहता ह।ै 7777....4444....4444 ललललचचचचीीीीललललीीीी ययययोोोोजजजजननननाााा इनम(cid:25) से कुछ पारेषण योजनाए ं िवशेषकर वे जो 12व8 योजना के अंत के वषi म(cid:25) आने वाली उ(cid:2)पादन प(cid:27)रयोजना(cid:31) के िलए आव(cid:29)यक ह " और िजनक पारेषण (cid:19)णाली सामूिहक ह,ै उसम(cid:25) बदलाव 'कया जा सकता ह ै और यह बदलाव सामूिहक पुDलग Dबद ु स े Dलक 'कए गए उ(cid:2)पादन ,मता क (cid:19)गित पर िनभ(cid:14)र होगा। 7777....4444....5555 इइइइंंंं7777ाााा////टटटटेेटटेेटट उउउउ9999पपपपााााददददनननन कककक(cid:19)(cid:19)(cid:19)(cid:19)3333'''' ककककेेेे ििििललललएएएए ययययोोोोजजजजननननााााएएएए ंं ंं रा3य ,े9 (अथवा िनजी ,े9 ले'कन िजसस े केवल गृह रा3य को ही लाभ हो) के अंतग(cid:14)त 12व8 योजना क कुछ उ(cid:2)पादन ,मता(cid:31) के िलए पारेषण (cid:19)णािलय% पर भी एक कृत (cid:19)णाली येाजना (cid:19)'(cid:15)या के िलए (cid:19)ायोिगक )प से िवचार 'कया गया, तथािप, इन पारेषण योजना(cid:31) को संबंिधत रररराााा(cid:3)(cid:3)(cid:3)(cid:3)यय यय पपपपााााररररेेेेषषषषणणणण ककककंंंंपपपपििििननननयययय(cid:14)(cid:14)(cid:14)(cid:14) Pारा योिजत और तैयार करने क आव(cid:29)यकता ह।ै अपे,ाकृत ये कम ,मता वाले उ(cid:2)पादन क(cid:25)F ह " िजसके िलए 220 केवी या उसस े कम वो@टेज (cid:9)तर को हटाना होता ह।ै 7777....4444....6666 एएएएससससटटटटीीीीयययय ूू ूू कककक.... (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ससससददुुददुु ढ़ढ़ढ़ढ़ृृृृ ीीीीककककररररणणणण ययययोोोोजजजजननननााााएएएए ंं ंं संबंिधत एसटीयू Pारा रा3य पारेषण नेटवक(cid:14) के िवकास और डीआईएससीओएम (cid:9)तर तक आईएसटीएस ि>ड Dबद ु स े िव(cid:17)ुत (cid:19)दायगी, जो'क 220 केवी या उसस े कम के वो@टेज (cid:9)तर पर ह,ै के िलए एसटीयू क (cid:19)णाली सुदढ़ृ ीकरण योजनाए ं बनाना अपेि,त ह।ै ऐसा अनुमान ह ै 'क (cid:19)(cid:2)येक एसटीयू 12व8 योजना के दौरान (cid:19)योग के िलए समय से पहले ही अपना काय(cid:14) पूरा कर लेगा और सीईए को समय पर इसक सूचना भी द े दगे ा ता'क भिव_य के पारेषण योजना अ(cid:24)ययन के िलए ऐस े पारेषण वृि- का अनुकरण 'कया जा सके। कुछ रा3य% क सूचना उपलNध ह ै और इसे िन`िलिखत भाग% म(cid:25) शािमल 'कया गया ह।ै 7777....4444....7777 पपपपााााररररेेेेषषषषणणणण ययययोोोोजजजजननननाााा<<<< ककककाााा ििििववववववववररररणणणण िन`िलिखत खंड% म(cid:25) योिजत अथवा योिजत क जा रही पारेषण योजनाए ं जो 12व8/शुHआती 13व8642 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] योजना के दौरान लाभ दगे ी उनक ,े9/रा3यवार सूची उपलNध करानी ह।ै (cid:19)(cid:2)येक योजना के अंतग(cid:14)त शािमल पारेषण का िववरण अनुबंध 7.1 स े अनुबंध 7.7 म(cid:25) दी गई ह।ै उ<री ,े9 –पारेषण योजना िववरण अनुबंध – 7.1 पिdमी ,े9 – पारेषण योजना िववरण अनुबंध – 7.2 दि,णी ,े9 – पारेषण योजना िववरण अनुबंध – 7.3 पूव] ,े9 – पारेषण योजना िववरण अनुबंध – 7.4 उ<री-पूव] – पारेषण योजना िववरण अनुबंध – 7.5 पारेषण योजना िववरण –भारत म(cid:25) नवीकरणीय ऊजा(cid:14) kोत अनुबंध – 7.6 पारेषण योजना िववरण –भूटान, बांगलादशे और नेपाल म(cid:25) िव(cid:17)ुत अनुबंध –7.7 प(cid:27)रयोजना के िलए 7777....5555 उउउउ====ररररीीीी (cid:15)(cid:15)(cid:15)(cid:15)ेे9ेे –––– पपपपााााररररेेेेषषषषणणणण ययययोोोोजजजजननननााााएएएए ंं ंं 7777....5555....1111 उउउउ====ररररीीीी (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे मममम (cid:19)(cid:19) (cid:19)(cid:19) ययययोोोोििििजजजजतततत (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ससससददुुददुु ढ़ढ़ढ़ढ़ृृृृ ीीीीककककररररणणणण ययययोोोोजजजजननननााााएएएए ंं ंं (cid:9)(cid:9)(cid:9)(cid:9)मममम सससस..ंं..ंं पपपपााााररररेेेेषषषषणणणण ससससददुुददुु ढ़ढ़ढ़ढ़ृृृृ ीीीीककककररररणणणण ययययोोोोजजजजननननाााा पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ससससााााररररणणणणीीीी सससस>>ंं>>ंं ययययाााा 1. उ<री ि>ड भाग-I के क(cid:25)Fीय भाग के िलए 765 केवी (cid:19)णाली एनआर-आईएस-01 2. उ<री ि>ड भाग-II के क(cid:25)Fीय भाग के िलए 765 केवी (cid:19)णाली एनआर-आईएस-02 3. उ<री ि>ड भाग-III के क(cid:25)Fीय भाग के िलए 765 केवी (cid:19)णाली एनआर-आईएस-03 4. एनआर (cid:19)णाली सुदढ़ृ ीकरण् योजना-XIX एनआर-आईएस-04 5. एनआर (cid:19)णाली सुदढ़ृ ीकरण् योजना-XX एनआर-आईएस-05 6. एनआर (cid:19)णाली सुदढ़ृ ीकरण् योजना-XXI एनआर-आईएस-06 7. एनआर (cid:19)णाली सुदढ़ृ ीकरण् योजना-XXII एनआर-आईएस-07 8. एनआर (cid:19)णाली सुदढ़ृ ीकरण् योजना-XXIII एनआर-आईएस-08 9. एनआर (cid:19)णाली सुदढ़ृ ीकरण् योजना-XXIV एनआर-आईएस-09 10. एनआर (cid:19)णाली सुदढ़ृ ीकरण् योजना-XXV एनआर-आईएस-10 11. एनआर (cid:19)णाली सुदढ़ृ ीकरण् योजना-XXVI एनआर-आईएस-11 12. एनआर (cid:19)णाली सुदढ़ृ ीकरण् योजना-XXVII एनआर-आईएस-12 13. एनआर (cid:19)णाली सुदढ़ृ ीकरण् योजना-XXVIII एनआर-आईएस-13 14. एनआर बस (cid:27)रए\टर योजनाए ं एनआर-आईएस-14 15. एनआर म(cid:25) (cid:19)णाली सुदढ़ृ ीकरण (उ<र करणपुरा प(cid:27)रयोजना से एनआर-आईएस-15 योजना को अलग करन े के बाद) 16. lीनगर (उ<राखंड) और (cid:27)टहरी के बीच आपसी संपक(cid:14) एनआर-आईएस-16¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 643 7777....5555....2222 उउउउ====ररररीीीी (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे सससस ेे ेेउउउउ9999पपपपााााददददनननन पपपप????ररररययययोोोोजजजजननननाााा ककककोोोो हहहहटटटटाााानननन ेे ेेकककक.... ययययोोोोजजजजननननाााा जजजज@@@@मममम ूू ूू औऔऔऔरररर ककककAAAAममममीीीीरररर मममम (cid:19)(cid:19) (cid:19)(cid:19) अअअअवववविििि////थथथथतततत उउउउ9999पपपपााााददददनननन पपपप????ररररययययोोोोजजजजननननााााएएएए::ंं::ंं (cid:9)(cid:9)(cid:9)(cid:9).... सससस..ंं..ंं पपपप????ररररययययोोोोजजजजननननाााा आआआआईईईईससससीीीी,,,, (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ससससााााररररणणणणीीीी सससस..ंं..ंं मममम (cid:19)(cid:19) (cid:19)(cid:19) पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ममममेगेगेगेगााााववववााााटटटट 1 'कशन गंगा 330 के(F एनआर-जेके-01 2 बघािलहार II 450 रा3य एनआर-जेके-02 3 उरी-II एचईपी 240 के(F एनआर-जेके -01/अ(cid:24)याय-6 4 चुटक एचईपी 44 के(F एनआर-जेके -02/अ(cid:24)याय-6 5 िनमु बाजगो 45 के(F एनआर-जेके -03/अ(cid:24)याय-6 ििििहहहहममममााााचचचचलललल (cid:11)(cid:11)(cid:11)(cid:11)ददददशशेेशशेे मममम (cid:19)(cid:19) (cid:19)(cid:19) अअअअवववविििि////थथथथतततत उउउउ9999पपपपााााददददनननन पपपप????ररररययययोोोोजजजजननननााााएएएए::ंं::ंं (cid:9)(cid:9)(cid:9)(cid:9).... सससस..ंं..ंं पपपप????ररररययययोोोोजजजजननननाााा आआआआईईईईससससीीीी,,,, (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ससससााााररररणणणणीीीी सससस..ंं..ंं मममम (cid:19)(cid:19) (cid:19)(cid:19) पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ममममेगेगेगेगााााववववााााटटटट 1 पाव(cid:14)ती-II 800 क(cid:25)F एनआर-एचपी-01 2 रामपुर 412 क(cid:25)F एनआर-एचपी-02 3 को@डम 800 क(cid:25)F एनआर-एचपी-03 4 (cid:27)टड%ग-I 100 िनजी एनआर-एचपी-04 5 सोरंग 100 िनजी एनआर-एचपी-05 6 यूएचएल III 100 रा3य एनआर-एचपी-06 7 कशांग I , II, III 195 रा3य एनआर-एचपी-07 8 सवारा कुmडु 110 रा3य एनआर-एचपी-08 9 कुटेहर 260 िनजी एनआर-एचपी-09 10 बजोली होली एचईपी 180 िनजी एनआर-एचपी-10 11 कुिनहर(आंn+नोगली+माइ(cid:15)ो) 196 रा3य एनआर-एचपी-11 12 स"ज 100 रा3य एनआर-एचपी-12 13 चमेरा–III एचईपी 231 क(cid:25)F एनआर-एचपी-01/ अ(cid:24)याय-6 14 पाव(cid:14)ती–III एचईपी 520 क(cid:25)F एनआर-एचपी-02/ अ(cid:24)याय-6 15 बुिधल एचईपी 70 आईपीपी एनआर-एचपी-04/ अ(cid:24)याय-6644 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] पपपपजजंंजजंं ााााबबबब मममम(cid:19)(cid:19) (cid:19)(cid:19) अअअअवववविििि////थथथथतततत उउउउ9999पपपपााााददददनननन पपपप????ररररययययोोोोजजजजननननााााएएएए::ंं::ंं (cid:9)(cid:9)(cid:9)(cid:9).... सससस..ंं..ंं पपपप????ररररययययोोोोजजजजननननाााा आआआआईईईईससससीीीी,,,, (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ससससााााररररणणणणीीीी सससस..ंं..ंं मममम (cid:19)(cid:19) (cid:19)(cid:19) पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ममममेगेगेगेगााााववववााााटटटट 1 नाभा – राजपुरा टीपीएस 1400 िनजी एनआर-पीबी-01 2 तलवंडी साबो 1980 िनजी एनआर-पीबी -02 3 गोDवदवाल साहबे 540 िनजी एनआर-पीबी-03 हहहह????ररररययययााााणणणणाााा मममम(cid:19)(cid:19) (cid:19)(cid:19) अअअअवववविििि////थथथथतततत उउउउ9999पपपपााााददददनननन पपपप????ररररययययोोोोजजजजननननााााएएएए::ंं::ंं (cid:9)(cid:9)(cid:9)(cid:9).... सससस..ंं..ंं पपपप????ररररययययोोोोजजजजननननाााा आआआआईईईईससससीीीी,,,, (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ससससााााररररणणणणीीीी सससस..ंं..ंं मममम (cid:19)(cid:19) (cid:19)(cid:19) पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ममममेगेगेगेगााााववववााााटटटट I 1 झRर- (इं'दरा गांधी) 500 क(cid:25)F एनआर-एचआर-01/अ(cid:24)याय-6 टीपीएस (यू- 3) 2 झRर ( महा(cid:2)मा गांधी) 660 िनजी एनआर-एचआर-02/अ(cid:24)याय-6 टीपीएस यू-2 (cid:20)(cid:20)(cid:20)(cid:20)दददद ललललीीीी मममम(cid:19)(cid:19) (cid:19)(cid:19) अअअअवववविििि////थथथथतततत उउउउ9999पपपपााााददददनननन पपपप????ररररययययोोोोजजजजननननााााएएएए::ंं::ंं (cid:9)(cid:9)(cid:9)(cid:9).... सससस..ंं..ंं पपपप????ररररययययोोोोजजजजननननाााा आआआआईईईईससससीीीी,,,, (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ससससााााररररणणणणीीीी सससस..ंं..ंं मममम (cid:19)(cid:19) (cid:19)(cid:19) पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ममममेगेगेगेगााााववववााााटटटट III 1 (cid:19)गित सीसीजीटी फेज- 750 रा3य एनआर-डीएल-01/अ(cid:24)याय-6 (पीपीसीएल) (जीटी4, एसटी1,एसटी2) ररररााााजजजज////थथथथाााानननन मममम (cid:19)(cid:19) (cid:19)(cid:19) अअअअवववविििि////थथथथतततत उउउउ9999पपपपााााददददनननन पपपप????ररररययययोोोोजजजजननननााााएएएए::ंं::ंं (cid:9)(cid:9)(cid:9)(cid:9).... सससस..ंं..ंं पपपप????ररररययययोोोोजजजजननननाााा आआआआईईईईससससीीीी,,,, (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ससससााााररररणणणणीीीी सससस..ंं..ंं मममम (cid:19)(cid:19) (cid:19)(cid:19) पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ममममेगेगेगेगााााववववााााटटटट 1 आरएपीपीडी (यू-7,8) 1400 क(cid:25)F एनआर-आरज-े 01 II 2 रामगढ़- 160 रा3य एनआर-आरज-े 02 3 छाबरा टीपीएस एसटी-2 500 रा3य एनआर-आरज-े 03 4 कालीDसध 1200 रा3य एनआर-आरज-े 03¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 645 5 बारDसगसर ए\सट(cid:25)शन 250 क(cid:25)F एनआर-आरज-े 04 6 lी सीम(cid:25)ट िलिमटेड 300 आईपीपी एनआर-आरज-े 05 7 जि@लपा कपुद] टीपीपी (यूिनट 540 आईपीपी एनआर-आरज-े 01/अ(cid:24)याय-6 5 – 8) उउउउ====ररररााााखखखखडडंंडडंं मममम(cid:19)(cid:19) (cid:19)(cid:19) अअअअवववविििि////थथथथतततत उउउउ9999पपपपााााददददनननन पपपप????ररररययययोोोोजजजजननननााााएएएए::ंं::ंं (cid:9)(cid:9)(cid:9)(cid:9).... सससस..ंं..ंं पपपप????ररररययययोोोोजजजजननननाााा आआआआईईईईससससीीीी,,,, (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ससससााााररररणणणणीीीी सससस..ंं..ंं मममम (cid:19)(cid:19) (cid:19)(cid:19) पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ममममेगेगेगेगााााववववााााटटटट 1 तपोवन िव_णुगढ़ 520 क(cid:25)F एनआर-यूके-01 2 Dसगोली भटवारी 99 आईपीपी एनआर-यूके-02 3 फटा Nय%ग 76 आईपीपी एनआर-यूके-03 4 धौली गंगा + 260 क(cid:25)F एनआर-यूके-04 )पिसयाबागर खिसयाबारा ,oa 5 कोटलीभेल क(cid:25)F-1क ख, 1045 क(cid:25)F एनआर-यूके-05 II कोटलीभेल एसटी- II 6 टेहरी- 1000 क(cid:25)F एनआर-यूके-06 7 लता तपोवन 171 क(cid:25)F एनआर-यूके-07 8 पाला मनेरी 480 रा3य एनआर-यूके-08 9 lवंथ एनज] (cid:19)ाइवेट िलिमटेड 450 आईपीपी एनआर-यूके-09 10 lीनगर 330 िनजी एनआर-यूके-10 उउउउ====रररर (cid:11)(cid:11)(cid:11)(cid:11)ददददशशेेशशेे मममम (cid:19)(cid:19) (cid:19)(cid:19) अअअअवववविििि////थथथथतततत उउउउ9999पपपपााााददददनननन पपपप????ररररययययोोोोजजजजननननााााएएएए::ंं::ंं (cid:9)(cid:9)(cid:9)(cid:9).... सससस..ंं..ंं पपपप????ररररययययोोोोजजजजननननाााा आआआआईईईईससससीीीी,,,, (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ससससााााररररणणणणीीीी सससस..ंं..ंं मममम (cid:19)(cid:19) (cid:19)(cid:19) पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ममममेगेगेगेगााााववववााााटटटट III 1 (cid:27)रहदं (यू-5 और6) 1000 क(cid:25)F एनआर-यूपी-01 III 2 Dसगरौली एसटी- 500 क(cid:25)F एनआर-यूपी-02 3 मेजा 1320 क(cid:25)F एनआर-यूपी-03 4 बारा 1980 िनजी एनआर-यूपी-03 5 कच(cid:14)णा 1320 िनजी एनआर-यूपी-03 6 लितलपुर टीपीएस 1980 रा3य एनआर-यूपी-04646 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 7 अनपारा डी 1000 रा3य एनआर-यूपी-05 8 परीqछा ए\सट(cid:25)शन (यू -5,6) 500 रा3य एनआर-यूपी-03/अ(cid:24)याय-6 9 हरदआु गंज टीपीएस ए\सट(cid:25)शन 250 रा3य एनआर-यूपी-02/ अ(cid:24)याय -6 यू-9 7777....6666 पपपपििििDDDDममममीीीी (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ---- पपपपााााररररेेेेषषषषणणणण ययययोोोोजजजजननननााााएएएए ंं ंं <+h 7777....6666....1111 पपपपििििDDDDममममीीीी (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे मममम (cid:19)(cid:19) (cid:19)(cid:19) ययययोोोोििििजजजजतततत (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ससससददुुददुु ृृृृ ककककररररणणणण ययययोोोोजजजजननननााााएएएए::ंं::ंं (cid:9)(cid:9)(cid:9)(cid:9)मममम सससस..ंं..ंं (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ससससददुुददुु ढ़ढ़ढ़ढ़ृृृृ ीीीीककककररररणणणण ययययोोोोजजजजननननाााा ससससााााररररणणणणीीीी सससस>>ंं>>ंं ययययाााा मममम (cid:19)(cid:19) (cid:19)(cid:19) पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी 1 यूटी डीएनएच म(cid:25) 400/220केवी एस/एस क (cid:9)थापना डN@यूआर-आईएस-01 2 यूटी डीएनएच म(cid:25) 400/220केवी एस/एस क (cid:9)थापना डN@यूआर-आईएस -02 3 रायपुर 400केवी एस/एस म(cid:25) ि(cid:9)पिलट बस Bव(cid:9)था और समाि^ डN@यआू र-आईएस -03 लाइन क (cid:27)रकंफ गरेशन/िश'फ्टंग 7777....6666....2222 पपपपििििDDDDमममम (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे मममम (cid:19)(cid:19) (cid:19)(cid:19) उउउउ9999पपपपााााददददनननन पपपप????ररररययययोोोोजजजजननननाााा ककककोोोो हहहहटटटटाााानननन ेे ेेकककक.... ययययोोोोजजजजननननाााा गगगगजजुुजजुु रररराााातततत मममम(cid:19)(cid:19) (cid:19)(cid:19) अअअअवववविििि////थथथथतततत ययययोोोोजजजजननननाााा पपपप????ररररययययोोोोजजजजननननााााएएएए::ंं::ंं (cid:9)(cid:9)(cid:9)(cid:9).... सससस..ंं..ंं पपपप????ररररययययोोोोजजजजननननाााा आआआआईईईईससससीीीी,,,, (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ससससााााररररणणणणीीीी सससस..ंं..ंं मममम (cid:19)(cid:19) (cid:19)(cid:19) पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ममममेगेगेगेगााााववववााााटटटट 1. केएपीपी ए\सट(cid:25)शन यू-3,4, 1400 क(cid:25)दर् डN@यूआर-जीजे-01 (1400मेगावाट) (क(cid:25)Fीय ,े9 sector) 2. यूएमपीपी मुंFा (यू-1 11व8 योजना म(cid:25) 4000 आईपीपी डN@यूआर-जीजे-02 शु) क गई) डN@यूआर-जीजे-03 डN@यूआर-जीजे-09 3. िपपावव टीपीएस-वीिडयोकॉन 1200 आईपीपी डN@यूआर-जीजे-04 4. धुवारण ए\सट(cid:25)शन 360 रा3य डN@यूआर-जीजे-05 5. भावनगर 500 रा3य डN@यूआर-जीजे-06 6. िसtा (cid:27)रप. ए\सटेशन 500 रा3य डN@यूआर-जीजे-07 7. िपपावव सीसीपीपी 702 रा3य डN@यूआर-जीजे-08 8. ऊकाई ए\सट(cid:25)शन 500 रा3य डN@यूआर-जीजे-10 9. वनाकबोरी टीपीएस 500 रा3य डN@यूआर-जीजे-11 10. शपूरजी प@लोनजी एनज] िलिमटेड 1320 आईपीपी डN@यूआर-जीजे-12 11. डीजीईएन टीपीएस -टोर(cid:25)ट पावर 1200 आईपीपी डN@यूआर-जीजे-13 िलिमटेड II 12. एनटीपीसी िलिमटेड (गांधार- ) 1300 क(cid:25)F डN@यूआर-जीजे-14 II 13. एनटीपीसी िलिमटेड (कावास- ) 1300 क(cid:25)F डN@यूआर-जीजे-15¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 647 14. गुजरात Jलूरोकेिमक@स िलिमटेड 300 आईपीपी डN@यूआर-जीजे-16 (जीएफएल) 15. Dसटे\स पावर िलिमटेड 1708 आईपीपी डN@यूआर-जीजे-17 16. ए(cid:9)सार-पावर यू-2 600 आईपीपी डN@यूआर-जीजे-05/अ(cid:24)याय-6 मममम(cid:2)(cid:2)(cid:2)(cid:2)यययय (cid:11)(cid:11)(cid:11)(cid:11)ददददशशेेशशेे मममम(cid:19)(cid:19) (cid:19)(cid:19) अअअअवववविििि////थथथथतततत उउउउ9999पपपपााााददददनननन पपपप????ररररययययोोोोजजजजननननााााएएएए::ंं::ंं (cid:9)(cid:9)(cid:9)(cid:9).... सससस..ंं..ंं पपपप????ररररययययोोोोजजजजननननाााा आआआआईईईईससससीीीी,,,, (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ससससााााररररणणणणीीीी सससस..ंं..ंं मममम (cid:19)(cid:19) (cid:19)(cid:19) पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ममममेगेगेगेगााााववववााााटटटट 1. Dव(cid:24)याचल IV (यू-11,12) 1000 क(cid:25)F डN@यूआर-एमपी-01 2. यूएमपीपी सासन 3960 आईपीपी डN@यूआर-एमपी-02 डN@यूआर-जीजे-09 3. बीना पावर 500 आईपीपी डN@यूआर-एमपी-03 डN@यूआर-सीजी-17 4. महान-ए(cid:9)सार पावर 1200 आईपीपी डN@यूआर-एमपी-04 5. आय(cid:14)न एमपी पावर जेनरेशन कंपनी 1200 आईपीपी डN@यूआर-एमपी-05 िलिमटेड डN@यूआर-सीजी-17 6. डीबी पावर (एमपी) िलिमटेड यू- 1320 आईपीपी डN@यूआर-एमपी-05 1,2 7. िचतरंगी पावर 5940 आईपीपी डN@यूआर-एमपी-05 8. िनगरी टीपीपी-जय(cid:19)काश पावर 1320 आईपीपी डN@यूआर-एमपी-06 डN@यूआर-सीजी-17 9. मोजरबीयर पावर(चरण 1) 1200 आईपीपी डN@यूआर-एमपी-07 डN@यूआर-सीजी-23 10. टुडे एनज] (एमपी) 1320 आईपीपी डN@यूआर-एमपी-07 डN@यूआर-सीजी-23 11. झबुआ पावर 1200 आईपीपी डN@यूआर-एमपी-07 डN@यूआर-सीजी-23 12. एसजेके पावरजेन िलिमटेड 1320 आईपीपी डN@यूआर-एमपी-07 13. मालवा (lी Dसह जी) टीपीपी 1200 रा3य डN@यूआर-एमपी-08 14. सतपुरा ए\सट(cid:25)शन (यू-10,11) 500 रा3य डN@यूआर-एमपी-09 15. ए(cid:9)सार पावर एमपी िलिमटेड 600 आईपीपी डN@यूआर-एमपी-11 II (महान चरण ) 16. माहVे र एचईपी 400 आईपीपी डN@यूआर-एमपी-01/अ(cid:24)याय-6648 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ममममहहहहााााररररााााEEEE मममम (cid:19)(cid:19) (cid:19)(cid:19) अअअअवववविििि////थथथथतततत उउउउ9999पपपपााााददददनननन पपपप????ररररययययोोोोजजजजननननााााएएएए::ंं::ंं (cid:9)(cid:9)(cid:9)(cid:9).... सससस..ंं..ंं पपपप????ररररययययोोोोजजजजननननाााा आआआआईईईईससससीीीी (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ससससााााररररणणणणीीीी सससस..ंं..ंं मममम (cid:19)(cid:19) (cid:19)(cid:19) पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ममममेगेगेगेगााााववववााााटटटट 1. मौदा क(cid:25)F-I ( यू- 1& 2) 1000 क(cid:25)F डN@यूआर-एमएच-01 2. मौदा क(cid:25)F -II 1320 क(cid:25)F डN@यूआर-एमएच-02 3. ितरोदा अदानी चरण I,यू-1,2,3 1320 आईपीपी डN@यूआर-एमएच-03 4. ितरोदा अदानी चरण -II, यू-1,2 1320 आईपीपी डN@यूआर-एमएच-03 5. इंिडया बुल-नािसक 1350 आईपीपी डN@यूआर-एमएच-04 6. इंिडया बुल-नंदनगांवपेट-अमरावती 1350 आईपीपी डN@यूआर-एमएच-05 7. बेला टीपीपी-आइिडयल पावर 540 आईपीपी डN@यूआर-एमएच-06 8. धारीवाल मूलसंरचना 600 आईपीपी डN@यूआर-एमएच-07 9. ईएमसीओ-वरोरा(महारा=) 600 आईपीपी डN@यूआर-एमएच-08 10. पा*ल + (cid:19)ित(cid:9)थापन 250 रा3य डN@यूआर-एमएच-09 11. कोराडी – II 1980 रा3य डN@यूआर-एमएच-10 12. च(Fपुर टीपीएस-II (यू -8,9) 1000 रा3य डN@यआू र-एमएच-11 (यू-8 11व8 योजना म(cid:25) शु) 'कया गया) 13. धोपावे 1600 रा3य डN@यूआर-एमएच-12 14. यूरान ए\सट(cid:25)शन 1040 आईपीपी डN@यूआर-एमएच-13 15. जीईपीएल टीपीपी यू-1 और 2 120 आईपीपी डN@यूआर-एमएच-14 16. एनपीसीआईएल ,जैतापुर 3480 क(cid:25)F डN@यूआर-एमएच-15 17. िजनभुिवश पावरजेन (cid:19)ाइवेट िलिमटेड 600 आईपीपी डN@यूआर-एमएच-16 (600 (cid:1)a(cid:2)(cid:3)(cid:4) 18. Dहद(cid:9)ु तान इलेि\[िसटी जेन 1137 आईपीपी डN@यूआर-एमएच-17 िलिमटेड (एचईजीसीएल) छछछछ====ीीीीससससगगगगढ़ढ़ढ़ढ़ मममम (cid:19)(cid:19) (cid:19)(cid:19) अअअअवववविििि////थथथथतततत उउउउ9999पपपपााााददददनननन पपपप????ररररययययोोोोजजजजननननााााएएएए::ंं::ंं (cid:9)(cid:9)(cid:9)(cid:9).... सससस..ंं..ंं पपपप????ररररययययोोोोजजजजननननाााा आआआआईईईईससससीीीी (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ससससााााररररणणणणीीीी सससस..ंं..ंं मममम (cid:19)(cid:19) (cid:19)(cid:19) पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ममममेगेगेगेगााााववववााााटटटट 1. िसपत-I 1980 क(cid:25)F डN@यूआर-सीजी-01 2. आरकेएम पावरजेन (cid:19)ाइवेट िलिमटेड 1440 आईपीपी डN@यूआर-सीजी-02 (ऊंचपांडा टीपीपी) डN@यूआर-सीजी-08 स े (यू 1- 4) डN@यूआर-सीजी-16¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 649 3. एसकेएस पावर िलिमटेड यू 1-4 1200 आईपीपी डN@यूआर-सीजी-02 (धरमपुरा टीपीपी) डN@यूआर-सीजी-08 स े डN@यूआर-सीजी-16 4. डीबी पावर 1200 आईपीपी डN@यूआर-सीजी-02 डN@यूआर-सीजी-08 स े डN@यूआर-सीजी-16 5. अथेना छ<ीसगढ़ पावर िलिमटेड 1200 आईपीपी डN@यूआर-सीजी-02 डN@यूआर-सीजी-08 स े डN@यूआर-सीजी-16 6. अवंथा भंडार टीपीपी 600 आईपीपी डN@यूआर-सीजी-02 डN@यूआर-सीजी-08 स े डN@यूआर-सीजी-16 7. कॉसमॉस (cid:9)पांज एUड पावर िलिमटेड 350 आईपीपी डN@यूआर-सीजी-02 (सीएसपीएल) 8. वीसा (cid:9)टील िलिमटेड 450 आईपीपी डN@यूआर-सीजी-02 9. जीएमआर छ<ीसगढ़ 1370 आईपीपी डN@यूआर-सीजी-03 डN@यूआर-सीजी-08 स े डN@यूआर-सीजी-16 10. केएसके (अकलतारा) महानदी पावर 2400 आईपीपी डN@यूआर-सीजी-04 डN@यूआर-सीजी-08 स े डN@यूआर-सीजी-16 11. कना(cid:14)टक पावर काप(cid:14) िलिमटेड 1600 आईपीपी डN@यूआर-सीजी-04 (केपीसीएल) डN@यूआर-सीजी-08 स े डN@यूआर-सीजी-16 12. लांको अमरकंटक यू-3 और 4 1320 आईपीपी डN@यूआर-सीजी-04 डN@यूआर-सीजी-08 स े डN@यूआर-सीजी-16 13. एम बी पावर (छ<ीसगढ़ िलिमटेड) 1320 आईपीपी डN@यूआर-सीजी-04 14. आय(cid:14)न कोल बेनी'फकेशन िलिमटेड 1200 आईपीपी डN@यूआर-सीजी-05 डN@यूआर-सीजी-08 स े डN@यूआर-सीजी-16 15. धी) पावरजेन और पीटीसी इंिडया 1050 आईपीपी डN@यूआर-सीजी-05 डN@यूआर-सीजी-17650 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 16. (cid:9)पे\[म पावर 100 आईपीपी डN@यूआर-सीजी-05 डN@यूआर-सीजी-17 17. मा)ित \लीन एUड पावर िलिमटेड 300 आईपीपी डN@यूआर-सीजी-05 डN@यूआर-सीजी-17 III 18. रायगढ़ चरण, यू 1-4 (Dजदल 2400 आईपीपी डN@यूआर-सीजी-06 पावर) डN@यूआर-सीजी-08 स े डN@यआू र-सीजी-16 19. टीआरएन एनज] (2x300 मेगावाट) 600 आईपीपी डN@यूआर-सीजी-06 डN@यूआर-सीजी-08 स े डN@यूआर-सीजी-16 20. सारदा एनज] एUड िमनरल 350 आईपीपी डN@यूआर-सीजी-06 (एसईएमएल) डN@यूआर-सीजी-08 स े डN@यूआर-सीजी-16 21. जायसवाल (यू ऊजा(cid:14) िलिमटेड 600 आईपीपी डN@यूआर-सीजी-06 (जेएनयूएल) डN@यूआर-सीजी-08 स े डN@यूआर-सीजी-16 22. बीएएलसीओ 600 आईपीपी डN@यूआर-सीजी-07 डN@यूआर-सीजी-08 स े डN@यूआर-सीजी-16 23. वंदना िव(cid:17)ुत 540 आईपीपी डN@यूआर-सीजी-07 डN@यूआर-सीजी-08 स े डN@यूआर-सीजी-16 24. (cid:9)वाि(cid:9)तक टीपीपी यू-1 25 आईपीपी डN@यूआर-सीजी-19 25. रितजा टीपीपी 50 आईपीपी डN@यूआर-सीजी-20 26. मारवा सीएसईबी 1000 रा3य डN@यूआर-सीजी-21 27. कोरबा (डN@यू) क(cid:25)F-III (यू-5) 500 रा3य डN@यूआर-सीजी-22 28. कसाइप@ली टीपीपी यू-2 135 आईपीपी डN@यूआर-सीजी-03/अ(cid:24)याय- 06 7777....7777 ददददिििि(cid:15)(cid:15)(cid:15)(cid:15)णणणणीीीी (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे –––– पपपपााााररररेेेेषषषषणणणण ययययोोोोजजजजननननााााएएएए ंं ंं 7777....7777....1111 ददददिििि(cid:15)(cid:15)(cid:15)(cid:15)णणणणीीीी (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे मममम (cid:19)(cid:19) (cid:19)(cid:19) ययययोोोोििििजजजजतततत (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ससससददुुददुु ढ़ढ़ढ़ढ़ृृृृ ीीीीककककररररणणणण ययययोोोोजजजजननननााााएएएए:::ंं:ंं (cid:9)(cid:9)(cid:9)(cid:9)मममम सससस..ंं..ंं पपपप????ररररययययोोोोजजजजननननाााा ससससददुुददुु ढ़ढ़ढ़ढ़ृृृृ ीीीीककककररररणणणण ययययोोोोजजजजननननाााा ससससााााररररणणणणीीीी सससस>>ंं>>ंं ययययाााा मममम (cid:19)(cid:19) (cid:19)(cid:19) पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी 1. एसआर-XII म(cid:25) (cid:19)णाली सुदढ़ृ ीकरण योजनाए ं एसआर-इएस-01 2. एसआर- XIII म(cid:25) (cid:19)णाली सदु ढ़ृ ीकरण योजनाए ं एसआर-इएस-02¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 651 3. एसआर- XIV म(cid:25) (cid:19)णाली सदु ढ़ृ ीकरण योजनाए ं एसआर-इएस-03 4. एसआर- XV म(cid:25) (cid:19)णाली सुदढ़ृ ीकरण योजनाए ं एसआर-इएस-04 5. एसआर- XVI म(cid:25) (cid:19)णाली सदु ढ़ृ ीकरण योजनाए ं एसआर-इएस-05 6. एसआर- XVII म(cid:25) (cid:19)णाली सदु ढ़ृ ीकरण योजनाए ं एसआर-इएस-06 7. एसआर- XVIII म(cid:25) (cid:19)णाली सुदढ़ृ ीकरण योजनाए ं एसआर-इएस-07 8. एसआर- XIX म(cid:25) (cid:19)णाली सुदढ़ृ ीकरण योजनाए ं एसआर-इएस-08 9. दि,णी ,े9 म(cid:25) एचवीडीसी बाइपोल सुदढ़ृ ीकरण एसआर-इएस-09 10. ईआर स े पावर आयात करन े के िलए एसआर म(cid:25) (cid:19)णाली एसआर-इएस-10 सुदढ़ृ ीकरण 7777....7777....2222 ददददिििि(cid:15)(cid:15)(cid:15)(cid:15)णणणणीीीी (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे मममम (cid:19)(cid:19) (cid:19)(cid:19) उउउउ9999पपपपााााददददनननन पपपप????ररररययययोोोोजजजजननननाााा<<<< ककककोोोो हहहहटटटटाााानननन ेे ेेकककक.... ययययोोोोजजजजननननााााएएएए ंं ंं आआआआIIंंIIंं (cid:11)(cid:11)(cid:11)(cid:11)ददददशशेेशशेे मममम (cid:19)(cid:19) (cid:19)(cid:19) अअअअवववविििि////थथथथतततत उउउउ9999पपपपााााददददनननन पपपप????ररररययययोोोोजजजजननननााााएएएए::ंं::ंं (cid:9)(cid:9)(cid:9)(cid:9).... सससस..ंं..ंं पपपप????ररररययययोोोोजजजजननननाााा आआआआईईईईससससीीीी (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ससससााााररररणणणणीीीी सससस..ंं..ंं मममम (cid:19)(cid:19) (cid:19)(cid:19) पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ममममेगेगेगेगााााववववााााटटटट 1. Dसहापुरी को(cid:9)टल-केपीटीएनएम 600 आईपीपी एसआर-एपी-01 (11व8 योजना म(cid:25) शु) क गयी यू-1) एसआर-एपी-02 2. मीना,ी एनज] एसटी-I + II 1000 आईपीपी एसआर-एपी-01 एसआर-एपी-02 3. थम(cid:14)ल पावरटेक काप 1980 आईपीपी एसआर-एपी-01 एसआर-एपी-02 4. कृ_णापuणम नवयुग 1320 आईपीपी एसआर-एपी-01 एसआर-एपी-02 5. 'कनेटा पावर 1980 आईपीपी एसआर-एपी-01 एसआर-एपी-02 6. एनसीसी पावर 1320 आईपीपी एसआर-एपी-01 एसआर-एपी-02 7. वीएसएफ (cid:19)ोजे\vस िलिमटेड 350 आईपीपी एसआर-एपी-01 8. अ@[ा मेगा कृ_णापuणम 3960 आईपीपी एसआर-एपी-03 (योजना को उ(cid:2)पादन प(cid:27)रयोजना से एसआर-एपी-04 अलग/प(cid:27)रव*तत कर 'दया गया ह,ै इसके भाग को (cid:19)णाली सुदढ़ृ ीकरण के )प म(cid:25) काया(cid:14)ि(वत 'कया जा रहा ह)ै652 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 9. पूव] तट- भावनपाडु टीपीपी 1320 आईपीपी एसआर-एपी-05 एसआर-एपी-06 10. जीएमआर- राजमुंFी 768 आईपीपी एसआर-एपी-07 एसआर-एपी-08 11. (cid:9)पे\[म-वेमािगरी-गैस 1400 आईपीपी एसआर-एपी-07 एसआर-एपी-08 12. (cid:27)रलायंस-वेमािगरी-गैस 2400 आईपीपी एसआर-एपी-07 एसआर-एपी-08 13. जीवीके-गौतमी-वेमािगरी-गैस 800 आईपीपी एसआर-एपी-07 एसआर-एपी-08 14. जीवीके-जग)पाडु-वेमािगरी-गैस 800 आईपीपी एसआर-एपी-07 एसआर-एपी-08 15. आरवीके एनज] 360 आईपीपी एसआर-एपी-07 16. Dहदजु ा िवजाग 1040 आईपीपी एसआर-एपी-09 17. लांको क%डाप@ली क(cid:25)F-III 740 आईपीपी एसआर-एपी-10 18. रायलसीमा क(cid:25)F -III (यू-6) 600 रा3य एसआर-एपी-11 19. पुिलDचताला एचईपी 120 रा3य एसआर-एपी-12 20. लोअर जुराला (यू1-6) एचईपी 240 रा3य एसआर-एपी-13 21. lी दामोदरम संजीवैरwया टीपीपी 1600 रा3य एसआर-एपी-14 (कृ_णपuणम टीपीपी) 22. नागाजु(cid:14)न सागर टीआर एचईपी 50 रा3य एसआर-एपी-02/अ(cid:24)याय-6 23. काकाितया टीपीपी II 600 रा3य एसआर-एपी-04/ अ(cid:24)याय -6 ककककननननााााटट(cid:8)(cid:8)टट(cid:8)(cid:8) कककक मममम(cid:19)(cid:19) (cid:19)(cid:19) अअअअवववविििि////थथथथतततत उउउउ9999पपपपााााददददनननन पपपप????ररररययययोोोोजजजजननननााााएएएए::ंं::ंं (cid:9)(cid:9)(cid:9)(cid:9).... सससस..ंं..ंं पपपप????ररररययययोोोोजजजजननननाााा आआआआईईईईससससीीीी (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ससससााााररररणणणणीीीी सससस..ंं..ंं मममम (cid:19)(cid:19) (cid:19)(cid:19) पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ममममेगेगेगेगााााववववााााटटटट 1. टोरानग@लू Dजदल यू-3 300 आईपीपी एसआर-केए-01 2. गुंिडया एचईपी 400 रा3य एसआर-केए-02 3. येरमा)स टीपीपी 1600 रा3य एसआर-केए-03 4. एदलापुर 800 रा3य एसआर-केए-03 5. कुडगी टीपीएस चरण-I 2400 क(cid:25)F एसआर-केए-04 6. सुरेना पावर िलिमटेड 420 आईपीपी एसआर-केए-05¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 653 ककककेेेेररररलललल मममम(cid:19)(cid:19) (cid:19)(cid:19) अअअअवववविििि////थथथथतततत उउउउ9999पपपपााााददददनननन पपपप????ररररययययोोोोजजजजननननााााएएएए::ंं::ंं (cid:7)(cid:7)(cid:7)(cid:7).... सससस..ंं..ंं पपपप(cid:10)(cid:10)(cid:10)(cid:10)ररररययययोोोोजजजजननननाााा आआआआईईईईससससीीीी (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ससससााााररररणणणणीीीी सससस..ंं..ंं मममम (cid:19)(cid:19) (cid:19)(cid:19)पपपपााााररररेेेेषषषषणणणण (cid:5)(cid:5)(cid:5)(cid:5)णणणणााााललललीीीी ममममगगेेगगेे ााााववववााााटटटट 1. थो(cid:27)uयार 40 रा3य एसआर-केई-01 2. पि@लवासल 60 रा3य एसआर-केई-02 ततततििििममममललललननननााााडडडडुुुु मममम (cid:19)(cid:19) (cid:19)(cid:19) अअअअवववविििि////थथथथतततत उउउउ9999पपपपााााददददनननन पपपप????ररररययययोोोोजजजजननननााााएएएए::ंं::ंं (cid:7)(cid:7)(cid:7)(cid:7).... सससस..ंं..ंं पपपप(cid:10)(cid:10)(cid:10)(cid:10)ररररययययोोोोजजजजननननाााा आआआआईईईईससससीीीी (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ससससााााररररणणणणीीीी सससस..ंं..ंं मममम (cid:19)(cid:19) (cid:19)(cid:19)पपपपााााररररेेेेषषषषणणणण (cid:5)(cid:5)(cid:5)(cid:5)णणणणााााललललीीीी ममममगगेेगगेे ााााववववााााटटटट 1. तुितको(cid:27)रन जेवी-एनएलसी 1000 क(cid:25)F एसआर-टीएन-01 2. को(cid:9)टल एनजWन-तुितको(cid:27)रन 1200 आईपीपी एसआर-टीएन-02 एसआर-टीएन-03 3. इंड बराथ-तुितको(cid:27)रन 1320 आईपीपी एसआर-टीएन-02 एसआर-टीएन-03 4. चेतीनाड पावर कॉपyरेशन (cid:19)ाइवेट 1200 आईपीपी एसआर-टीएन-02 िलिमटेड 5. एनएसएल-नागापuणम 1320 आईपीपी एसआर-टीएन-04 एसआर-टीएन-05 6. पीपीएन पावर जेनरेzटग कंपनी 1080 आईपीपी एसआर-टीएन-04 एसआर-टीएन-05 7. चेतीनाड पावर कॉपyरेशन िलिमटेड 1320 आईपीपी एसआर-टीएन-04 एसआर-टीएन-05 8. पीईएल पावर िलिमटेड (1050 मेगावाट) 1050 आईपीपी एसआर-टीएन-04 एसआर-टीएन-05 9. आईएल एUड एफएस तिमलनाडु पावर 1200 आईपीपी एसआर-टीएन-04 कंपनी िलिमटेड एसआर-टीएन-05 10. (cid:27)रजेन पावरटेक (cid:19)ाइवेट िलिमटेड 600 आईपीपी एसआर-टीएन-06 11. उडनगुडी जेवी 1600 रा3य एसआर-टीएन-07 12. कलपtम पीएफबीआर 500 क(cid:25)F एसआर-टीएन-08 13. व@लूर(एIोर) जेवी यू-2,3 1000 क(cid:25)F एसआर-टीएन-01/ अ(cid:24)याय-6 14. नेवेली टीपीएस II यू-2 250 क(cid:25)F एसआर-टीएन-02/अ(cid:24)याय-6 15. कुडनकुलम आणिवक क(cid:25)F-I 2000 क(cid:25)F एसआर-टीएन-03/ अ(cid:24)याय -6 16. उ<री चेIई ए\सट(cid:25)शन यू-1,2 1200 क(cid:25)F एसआर-टीएन-04/ अ(cid:24)याय -6 17. भवानी बैरेज II और III 60 रा3य एसआर-टीएन-05/ अ(cid:24)याय -6 18. मेvटूर टीपीएस क(cid:25)F-III (यू-1) 600 रा3य एसआर-टीएन-06/ अ(cid:24)याय -6654 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 7777....8888 पपपपूवूवूवूव0000 (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ---- पपपपााााररररेेेेषषषषणणणण ययययोोोोजजजजननननााााएएएए ंं ंं 7777....8888....1111 पपपपूवूवूवूव0000 (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे मममम (cid:19)(cid:19) (cid:19)(cid:19) ययययोोोोििििजजजजतततत (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ससससददुुददुु ढ़ढ़ढ़ढ़ृृृृ ीीीीककककररररणणणण ययययोोोोजजजजननननााााएएएए ंं ंं:::: (cid:9)(cid:9)(cid:9)(cid:9)मममम पपपप????ररररययययोोोोजजजजननननाााा ससससददुुददुु ढ़ढ़ढ़ढ़ृृृृ ीीीीककककररररणणणण ययययोोोोजजजजननननाााा ससससााााररररणणणणीीीी सससस>>ंं>>ंं ययययाााा मममम (cid:19)(cid:19) (cid:19)(cid:19) पपपपााााररररेेेेषषषषणणणण सससस..ंं..ंं (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी 1. पूव] ,ेत्र सुदढ़ृ ीकरण योजना-III ईआर-आईएस-01 2. पूव] ,े9 सुदढ़ृ ीकरण योजना-IV ईआर-आईएस-02 3. पूव] ,े9 सुदढ़ृ ीकरण योजना-V ईआर-आईएस-03 4. पूव] ,े9 सुदढ़ृ ीकरण योजना–VII (पिdम बंगाल के िलए) ईआर-आईएस-04 5. पूव] ,े9 सुदढ़ृ ीकरण योजना-VI (िबहार के िलए) ईआर-आईएस-05 7777....8888....2222 पपपपूवूवूवूव0000 (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे मममम (cid:19)(cid:19) (cid:19)(cid:19) उउउउ9999पपपपााााददददनननन पपपप????ररररययययोोोोजजजजननननाााा<<<< ककककोोोो हहहहटटटटाााानननन ेे ेेकककक.... ययययोोोोजजजजननननाााा ििििबबबबहहहहाााारररर मममम(cid:19)(cid:19) (cid:19)(cid:19) अअअअवववविििि////थथथथतततत उउउउ9999पपपपााााददददनननन पपपप????ररररययययोोोोजजजजननननााााएएएए ंं ंं:::: (cid:9)(cid:9)(cid:9)(cid:9).... सससस..ंं..ंं पपपप????ररररययययोोोोजजजजननननाााा आआआआईईईईससससीीीी ममममेगेगेगेगााााववववााााटटटट (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ससससााााररररणणणणीीीी सससस..ंं..ंं मममम (cid:19)(cid:19) (cid:19)(cid:19) पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी 1. बाढ़ II यू 1,2 1320 क(cid:25)F ईआर-बीआर-01 ईआर-जेएच-06 2. नबी नगर जेवी (रेलव े 1000 क(cid:25)F ईआर-बीआर-02 +एनटीपीसी) ईआर-जेएच-06 3. (यू नबी नगर जेवी 1980 क(cid:25)F ईआर-बीआर-03 (िबहार+एनटीपीसी) 4. मुजJफरपुर ए\सट(cid:25)शन जेवी 390 क(cid:25)F ईआर-बीआर-04 5. बाढ़-I (यू-1,2,3) 1980 क(cid:25)F ईआर-बीआर-01/अ(cid:24)याय-6 झझझझााााररररखखखखंडंडंडंड मममम(cid:19)(cid:19) (cid:19)(cid:19) अअअअवववविििि////थथथथतततत उउउउ9999पपपपााााददददनननन पपपप????ररररययययोोोोजजजजननननााााएएएए::ंं::ंं (cid:9)(cid:9)(cid:9)(cid:9).... सससस..ंं..ंं पपपप????ररररययययोोोोजजजजननननाााा आआआआईईईईससससीीीी ममममेगेगेगेगााााववववााााटटटट (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ससससााााररररणणणणीीीी सससस..ंं..ंं मममम (cid:19)(cid:19) (cid:19)(cid:19) पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी 1. बोकारो ए\सप"शन 500 क(cid:25)F ईआर-जेएच-01 ईआर-जेएच-01/ अ(cid:24)याय-6 2. कोडरमा टीपीपी यू-2 500 क(cid:25)F ईआर-जेएच-01/ अ(cid:24)याय-6 3. आधुिनक पावर – झारखंड 540 आईपीपी ईआर-जेएच-02 ईआर-जेएच-03 ईआर-जेएच-04¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 655 4. कापyरेट (चरण-I) 540 आईपीपी ईआर-जेएच-02 (माताlी उषा टीपीपी ) ईआर-जेएच-03 ईआर-जेएच-04 5. कॉपyरेट (चरण-II) 540 आईपीपी ईआर-जेएच-02 ईआर-जेएच-03 ईआर-जेएच-04 6. ए(cid:9)सार पावर/तोरी टीपीएस 1200 आईपीपी ईआर-जेएच-02 ईआर-जेएच-03 ईआर-जेएच-04 7. ितलैया यूएमपीपी 4000 आईपीपी ईआर-जेएच-05 ईआर-जेएच-06 ओओओओििििडडडडशशशशाााा मममम (cid:19)(cid:19) (cid:19)(cid:19) अअअअवववविििि////थथथथतततत उउउउ9999पपपपााााददददनननन पपपप????ररररययययोोोोजजजजननननााााएएएए::ंं::ंं (cid:9)(cid:9)(cid:9)(cid:9).... सससस..ंं..ंं पपपप????ररररययययोोोोजजजजननननाााा आआआआईईईईससससीीीी ममममेगेगेगेगााााववववााााटटटट (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ससससााााररररणणणणीीीी सससस..ंं..ंं मममम (cid:19)(cid:19) (cid:19)(cid:19) पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी 1. (cid:9)टरलाइट टीपीपी यू-4 600 आईपीपी ईआर-ओआर-01, ईआर-ओआर-02 (11व8 योजना म(cid:25) शु) क गयी यू- ईआर-ओआर-03, ईआर-ओआर-04 1,2,3) ईआर-ओआर-05 2. मिल|}ाणी टीपीपी/मोनेट पावर 1050 आईपीपी ईआर-ओआर-01, ईआर-ओआर-02 ईआर-ओआर-03, ईआर-ओआर-04 ईआर-ओआर-05 3. कमलगंगा टीपीपी – जीएमआर 1050 आईपीपी ईआर-ओआर-01, ईआर-ओआर-02 ईआर-ओआर-03, ईआर-ओआर-04 ईआर-ओआर-05 4 महालeमी-नवभारत 1050 आईपीपी ईआर-ओआर-01, ईआर-ओआर-02 ईआर-ओआर-03, ईआर-ओआर-04 ईआर-ओआर-05 5 इंड बराथ – ओिडशा 700 आईपीपी ईआर-ओआर-01, ईआर-ओआर-02 ईआर-ओआर-03, ईआर-ओआर-04 ईआर-ओआर-05 6 Dजदल इंिडया थम(cid:14)ल 1200 आईपीपी ईआर-ओआर-01, ईआर-ओआर-02 ईआर-ओआर-03, ईआर-ओआर-04 ईआर-ओआर-05656 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 7 लांको बाबंध 2640 आईपीपी ईआर-ओआर-01, ईआर-ओआर-02 ईआर-ओआर-03, ईआर-ओआर-04 ईआर-ओआर-05 8 डरे ांग टीपीपी-जेआईटीपीएल 1200 आईपीपी ईआर-ओआर-01, ईआर-ओआर-02 ईआर-ओआर-03, ईआर-ओआर-04 ईआर-ओआर-05 ििििसससस(cid:20)(cid:20)(cid:20)(cid:20)JJJJमममम मममम (cid:19)(cid:19) (cid:19)(cid:19) अअअअवववविििि////थथथथतततत उउउउ9999पपपपााााददददनननन पपपप????ररररययययोोोोजजजजननननााााएएएए::ंं::ंं (cid:9)(cid:9)(cid:9)(cid:9).... सससस..ंं..ंं पपपप????ररररययययोोोोजजजजननननाााा आआआआईईईईससससीीीी ममममेगेगेगेगााााववववााााटटटट (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ससससााााररररणणणणीीीी सससस..ंं..ंं मममम (cid:19)(cid:19) (cid:19)(cid:19) पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी 1 ती(cid:9)ता– III एचईपी 1200 आईपीपी ईआर-एसएम-01, ईआर-एसएम-02 ईआर-एसएम-03 2 ती(cid:9)ता-VI 500 आईपीपी ईआर-एसएम-01, ईआर-एसएम-02 ईआर-एसएम-03 3 रंगीत-IV 120 आईपीपी ईआर-एसएम-01, ईआर-एसएम-02 ईआर-एसएम-03 4 भा_मे 51 आईपीपी ईआर-एसएम-01, ईआर-एसएम-02 ईआर-एसएम-03 5 जोरेथांग लूप 96 आईपीपी ईआर-एसएम-01, ईआर-एसएम-02 ईआर-एसएम-03 6 र%गनीच ु 96 आईपीपी ईआर-एसएम-01, ईआर-एसएम-02 ईआर-एसएम-03 7 चुजाचेन एचईपी (गित ) 99 आईपीपी ईआर-एसएम-01, ईआर-एसएम-02 ईआर-एसएम-03 8 पनन 300 आईपीपी ईआर-एसएम-04, ईआर-एसएम-05 ईआर-एसएम-06 9 zटगzटग 99 आईपीपी ईआर-एसएम-04, ईआर-एसएम-05 ईआर-एसएम-06 10 तािशDडग 97 आईपीपी ईआर-एसएम-04, ईआर-एसएम-05 ईआर-एसएम-06 11 िड\च ु 96 रा3य ईआर-एसएम-04, ईआर-एसएम-05 ईआर-एसएम-06¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 657 पपपपििििDDDDमममम बबबबंगंगंगंगाााालललल मममम (cid:19)(cid:19) (cid:19)(cid:19) अअअअवववविििि////थथथथतततत उउउउ9999पपपपााााददददनननन पपपप????ररररययययोोोोजजजजननननााााएएएए ंं ंं:::: (cid:9)(cid:9)(cid:9)(cid:9).... पपपप????ररररययययोोोोजजजजननननाााा आआआआईईईईससससीीीी ममममेगेगेगेगााााववववााााटटटट (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ससससााााररररणणणणीीीी सससस..ंं..ंं मममम (cid:19)(cid:19) (cid:19)(cid:19) पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी सससस..ंं..ंं 1 रघुनाथपुर चरण-1 (यू-1 & 2) 1200 क(cid:25)F ईआर-डN@यूबी-01 ईआर-डN@यूबी-02 2 एनआर Pारा डीवीसी स े िव(cid:17)ुत क(cid:25)F ईआर-डN@यूबी-02 आयात के िलए सामूिहक पारेषण 3 ईआर म(cid:25) पुDलग क(cid:25)F के िलए पारेषण क(cid:25)F ईआर-डN@यूबी-03 (cid:19)णाली और भूटान म(cid:25) अवि(cid:9)थत प(cid:27)रयोजना(cid:31) से एनआर/डN@यूआर को िव(cid:17)ुत अंतरण 4 सीईएससी हि@दया 600 िनजी ईआर-डN@यूबी-04 5 दगु ा(cid:14)पुर डीपीएल नया(यू-8) 250 रा3य ईआर-डN@यूबी-05 6 ती(cid:9)ता लो डमै IV 160 क(cid:25)F ईआर-डN@यबू ी-01/अ(cid:24)याय-6 7 ती(cid:9)ता लो डमै III 132 क(cid:25)F ईआर-डN@यूबी-02/ अ(cid:24)याय -6 7777....8888....3333 पपपपूवूवूवूव0000 (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे –––– एएएएससससटटटटीीीीयययय ूू ूूकककक.... रररराााा&&&&यययय ििििKKKKडडडड ससससददुुददुु ढ़ढ़ढ़ढ़ृृृृ ीीीीककककररररणणणण ययययोोोोजजजजननननााााएएएए::ंं::ंं (cid:9)(cid:9)(cid:9)(cid:9)मममम सससस..ंं..ंं पपपप????ररररययययोोोोजजजजननननाााा ससससददुुददुु ढ़ढ़ढ़ढ़ृृृृ ीीीीककककररररणणणण ययययोोोोजजजजननननाााा ससससााााररररणणणणीीीी सससस>>ंं>>ंं ययययाााा मममम (cid:19)(cid:19) (cid:19)(cid:19) पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी 1 पिdम बंगाल म(cid:25) (cid:19)णाली सुदढ़ृ ीकरण योजना ईआर-एसएस-डN@यूबी 7777....9999 पपपपूवूवूवूवLLLL====रररर (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे –––– पपपपााााररररेेेेषषषषणणणण ययययोोोोजजजजननननााााएएएए ंं ंं 7777....9999....1111 पपपपूवूवूवूवLLLL====रररर (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे मममम(cid:19)(cid:19) (cid:19)(cid:19) ययययोोोोििििजजजजतततत (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ससससददुुददुु ढ़ढ़ढ़ढ़ृृृृ ीीीीककककररररणणणण ययययोोोोजजजजननननााााएएएए ंं ंं:::: (cid:9)(cid:9)(cid:9)(cid:9)मममम सससस..ंं..ंं पपपप????ररररययययोोोोजजजजननननाााा ससससददुुददुु ढ़ढ़ढ़ढ़ृृृृ ीीीीककककररररणणणण ययययोोोोजजजजननननाााा ससससााााररररणणणणीीीी सससस>>ंं>>ंं ययययाााा मममम (cid:19)(cid:19) (cid:19)(cid:19) पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी 1 एनईआर चरण-I और II म(cid:25) पारेषण का सुदढ़ृ ीकरण एनईआर-आईएस-01 7777....9999....2222 पपपपूवूवूवूवLLLL====रररर (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे मममम(cid:19)(cid:19) (cid:19)(cid:19) उउउउ9999पपपपााााददददनननन ययययोोोोजजजजननननाााा<<<< ककककोोोो हहहहटटटटाााानननन ेे ेेकककक.... ययययोोोोजजजजननननााााएएएए ंं ंं अअअअ(cid:27)(cid:27)(cid:27)(cid:27)णणणणााााचचचचलललल (cid:11)(cid:11)(cid:11)(cid:11)ददददशशेेशशेे मममम (cid:19)(cid:19) (cid:19)(cid:19) अअअअवववविििि////थथथथतततत उउउउ9999पपपपााााददददनननन पपपप????ररररययययोोोोजजजजननननााााएएएए ंं ंं:::: (cid:9)(cid:9)(cid:9)(cid:9).... सससस..ंं..ंं पपपप????ररररययययोोोोजजजजननननाााा आआआआईईईईससससीीीी ममममेगेगेगेगााााववववााााटटटट (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ससससााााररररणणणणीीीी सससस..ंं..ंं मममम (cid:19)(cid:19) (cid:19)(cid:19) पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी 1 पारे िडकरांग एचईपी 110 क(cid:25)F एनईआर-एआरपी-01658 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 2 काम(cid:25)ग 600 क(cid:25)F एनईआर-एआरपी-02 एनईआर-एआरपी-04 3 लोअर सुबानिसरी 2000 क(cid:25)F एनईआर-एआरपी-03 एनईआर-एआरपी-04 4 खुईताम 33 आईपीपी एनईआर-एआरपी-05 5 डमे वे लोअर 341 आईपीपी एनईआर-एआरपी-06 6 केएसके िडिबन हाइ~ो पावर 120 आईपीपी एनईआर-एआरपी-07 िलिमटेड एनईआर-एआरपी-08 7 आ'दशंकर िखतम पावर िलिमटेड 66 आईपीपी एनईआर-एआरपी-07 एनईआर-एआरपी-08 8 पटेल हाइ~ो (cid:19)ाइवेट 273 आईपीपी एनईआर-एआरपी-07 िलिमटेड(घुंगरी और सासक>ांग) एनईआर-एआरपी-08 9 एसईडN@यू ना(cid:127)ा पावर कॉपyरेशन 120 आईपीपी एनईआर-एआरपी-07 िलिमटेड एनईआर-एआरपी-08 अअअअससससमममम मममम(cid:19)(cid:19) (cid:19)(cid:19) अअअअवववविििि////थथथथतततत उउउउ9999पपपपााााददददनननन पपपप????ररररययययोोोोजजजजननननााााएएएए::ंं::ंं (cid:9)(cid:9)(cid:9)(cid:9).... सससस..ंं..ंं पपपप????ररररययययोोोोजजजजननननाााा आआआआईईईईससससीीीी ममममेगेगेगेगााााववववााााटटटट (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ससससााााररररणणणणीीीी सससस..ंं..ंं मममम (cid:19)(cid:19) (cid:19)(cid:19) पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी 1 ब%गाइगांव टीपीपी 250 क(cid:25)F एनईआर-एएस-01 एनईआर-एएस -02 2 नाम)प + ए\सट(cid:25)शन 100 रा3य एनईआर-एएस -03 ममममघघेेघघेे ााााललललयययय मममम(cid:19)(cid:19) (cid:19)(cid:19) अअअअवववविििि////थथथथतततत उउउउ9999पपपपााााददददनननन पपपप????ररररययययोोोोजजजजननननााााएएएए::ंं::ंं (cid:9)(cid:9)(cid:9)(cid:9).... सससस..ंं..ंं पपपप????ररररययययोोोोजजजजननननाााा आआआआईईईईससससीीीी ममममेगेगेगेगााााववववााााटटटट (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ससससााााररररणणणणीीीी सससस..ंं..ंं मममम (cid:19)(cid:19) (cid:19)(cid:19) पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी 1 (यू उ€9ु 40 रा3य एनईआर-एमजी-01 2 ल(cid:25)(cid:29)का Dमदतु एचईपी (अित(cid:27)र(cid:129) 42 रा3य एनईआर-एमजी -01/अ(cid:24)याय-6 इकाई) ििििममममजजजजोोोोररररमममम मममम (cid:19)(cid:19) (cid:19)(cid:19) अअअअवववविििि////थथथथतततत उउउउ9999पपपपााााददददनननन पपपप????ररररययययोोोोजजजजननननााााएएएए::ंं::ंं (cid:9)(cid:9)(cid:9)(cid:9).... सससस..ंं..ंं पपपप????ररररययययोोोोजजजजननननाााा आआआआईईईईससससीीीी ममममेगेगेगेगााााववववााााटटटट (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ससससााााररररणणणणीीीी सससस..ंं..ंं मममम (cid:19)(cid:19) (cid:19)(cid:19) पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी 1 ‚ू(cid:27)रयल एचईपी 60 क(cid:25)F एनईआर-एमजेड-01¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 659 िििि(cid:17)(cid:17)(cid:17)(cid:17)पपपपररुुररुु ाााा मममम(cid:19)(cid:19) (cid:19)(cid:19) अअअअवववविििि////थथथथतततत उउउउ9999पपपपााााददददनननन पपपप????ररररययययोोोोजजजजननननााााएएएए::ंं::ंं (cid:9)(cid:9)(cid:9)(cid:9).... सससस..ंं..ंं पपपप????ररररययययोोोोजजजजननननाााा आआआआईईईईससससीीीी ममममेगेगेगेगााााववववााााटटटट (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ससससााााररररणणणणीीीी सससस..ंं..ंं मममम (cid:19)(cid:19) (cid:19)(cid:19) पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी 1 प@लाताना 726 क(cid:25)F एनईआर-टीआर-01 एनईआर-एएस-02 2 मोनाच(cid:14)क गैस प(cid:27)रयोजना 105 क(cid:25)F एनईआर-टीआर -02 7777....9999....3333 पपपपूवूवूवूवLLLL====रररर (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ----एएएएससससटटटटीीीीयययय ूू ूू कककक.... रररराााा&&&&यययय ििििKKKKडडडड ससससददुुददुु ढ़ढ़ढ़ढ़ृृृृ ीीीीककककररररणणणण ययययोोोोजजजजननननााााएएएए::ंं::ंं (cid:9)(cid:9)(cid:9)(cid:9)मममम सससस..ंं..ंं पपपप????ररररययययोोोोजजजजननननाााा ससससददुुददुु ढ़ढ़ढ़ढ़ृृृृ ीीीीककककररररणणणण ययययोोोोजजजजननननाााा ससससााााररररणणणणीीीी सससस>>ंं>>ंं ययययाााा मममम (cid:19)(cid:19) (cid:19)(cid:19) पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी 1 अHणाचल (cid:19)दशे म(cid:25) (cid:19)णाली सुदढ़ृ ीकरण योजना एनईआर-एसएस-एआरपी 2 असम म(cid:25) (cid:19)णाली सुदढ़ृ ीकरण योजना एनईआर-एसएस-एएस 3 मिणपुर म(cid:25) (cid:19)णाली सुदढ़ृ ीकरण योजना एनईआर-एसएस-एमआर 4 िमजोरम म(cid:25) (cid:19)णाली सुदढ़ृ ीकरण योजना एनईआर-एसएस-एमजेड 5 ि9पुरा म(cid:25) (cid:19)णाली सुदढ़ृ ीकरण योजना एनईआर-एसएस-टीआर 6 मेघालय म(cid:25) (cid:19)णाली सुदढ़ृ ीकरण योजना एनईआर-एसएस-एमजी 7 नागाल"ड म(cid:25) (cid:19)णाली सुदढ़ृ ीकरण योजना एनईआर-एसएस-एनजी 7777....11110000 भभभभााााररररतततत मममम (cid:19)(cid:19) (cid:19)(cid:19) ननननववववीीीीककककररररणणणणीीीीयययय ऊऊऊऊजजजजाााा (cid:8)(cid:8) (cid:8)(cid:8)OOOOोोोोतततत'''' ककककेेेे ििििललललएएएए पपपपााााररररेेेेषषषषणणणण ययययोोोोजजजजननननाााा (cid:9)(cid:9)(cid:9)(cid:9).... पपपप????ररररययययोोोोजजजजननननाााा आआआआईईईईससससीीीी ससससााााररररणणणणीीीी सससस..ंं..ंं मममम (cid:19)(cid:19) (cid:19)(cid:19) पपपपााााररररेेेेषषषषणणणण सससस..ंं..ंं ममममेगेगेगेगााााववववााााटटटट (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी 1 राज(cid:9)थान म(cid:25) सौर और नया वायु ऊजा(cid:14) प(cid:27)रयोजना (2650 2650 आरईएस-आरज-े 01 मेगावाट) 2 चरंका सौर पाक(cid:14) म(cid:25) सौर प(cid:27)रयोजना(cid:31) के िलए पारेषण (cid:19)णाली 950.5 आरईएस-जीज-े 01 (950.5 मेगावाट) 3 गुजरात म(cid:25) वायु प(cid:27)रयोजना(cid:31) के िलए पारेषण (cid:19)णाली 4500 आरईएस-जीज े -02 4 गुजरात म(cid:25) वायु प(cid:27)रयोजना(cid:31) के िलए (cid:19)णाली सुदढ़ृ ीकरण - आरईएस-जीज े -03 (4500 मेगावाट) 5 तिमलनाडु म(cid:25) वायु प(cid:27)रयोजनाए ं (चरण-I ) 6300 आरईएस-टीएन-01 6 तिमलनाडु म(cid:25) वायु प(cid:27)रयोजनाए ं (चरण-II ) 5800 आरईएस-टीएन -02660 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 7 आंn (cid:19)दशे म(cid:25) वायु प(cid:27)रयोजनाए ं 3150 आरईएस-टीपी-01 8 कना(cid:14)टक म(cid:25) वायु प(cid:27)रयोजनाए ं 600 आरईएस-केआर-01 7777....11111111 भभभभटटूूटटूू ाााानननन,,,, बबबबगगंंगगंं ललललााााददददशशेेशशेे औऔऔऔरररर ननननपपेेपपेे ाााालललल मममम (cid:19)(cid:19) (cid:19)(cid:19)उउउउ9999पप पप ााााददददनननन पपपप????ररररययययोोोोजजजजननननाााा<<<< ककककेेेे ििििललललएएएए ििििननननPPPPकक कक षषषषणण(cid:8)(cid:8)णण(cid:8)(cid:8) ययययोोोोजजजजननननााााएएएए ंं ंं– भभभभााााररररतततत मममम (cid:19)(cid:19) (cid:19)(cid:19)ििििववववRRRRततुुततुु ककककेेेे आआआआययययाााातततत ककककेेेे ििििललललएएएए (cid:9)(cid:9)(cid:9)(cid:9).... सससस..ंं..ंं पपपप????ररररययययोोोोजजजजननननाााा आआआआईईईईससससीीीी ममममेगेगेगेगााााववववााााटटटट (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ससससााााररररणणणणीीीी सससस..ंं..ंं मममम (cid:19)(cid:19) (cid:19)(cid:19) पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी 1 फुनातसांगच ु क(cid:25)F-I 1200 - बबबबीीीीएएएएचचचच-01 2 फुनातसांगच ु क(cid:25)F -II 990 - बबबबीीीीएएएएचचचच-02 3 मांगधेचु 720 - बबबबीीीीएएएएचचचच-03 4. भूटान के अिधशेष के आगत के िलए - - बबबबीीीीएएएएचचचच-04 भारतीय ि>ड का सुदढ़ृ ीकरण (cid:9)(cid:9)(cid:9)(cid:9).... सससस..ंं..ंं पपपप????ररररययययोोोोजजजजननननाााा ससससााााररररणणणणीीीी सससस..ंं..ंं मममम (cid:19)(cid:19) (cid:19)(cid:19) पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी.... 1 500 मेगावाट तक क िबजली का आदान-(cid:19)दान सुकर करन े के िलए बीजी-01 भारत और नेपाल ि>ड के बीच सीमा पार आपसी संपक(cid:14) (cid:9)(cid:9)(cid:9)(cid:9).... सससस..ंं..ंं पपपप????ररररययययोोोोजजजजननननाााा ससससााााररररणणणणीीीी सससस..ंं..ंं मममम (cid:19)(cid:19) (cid:19)(cid:19) पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी.... 1 दोन% दशे % के बीच िबजली का आदान-(cid:19)दान सुकर करन े के िलए एनपी -01 भारत और नेपाल ि>ड के बीच सीमा पार आपसी संपक(cid:14) 7.1111112222वववव(cid:6)(cid:6)(cid:6)(cid:6) ययययोोोोजजजजननननाााा////11113333वववव(cid:6)(cid:6)(cid:6)(cid:6) ययययोोोोजजजजननननाााा कककक.... आआआआररररंंंंििििभभभभकककक अअअअववववििििधधधध ककककेेेे ििििललललएएएए ययययोोोोजजजजननननाााागगगगतततत 777766665555 ककककेेेेववववीीीी पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााििििललललययययाााांंंं 7777....11112222....1111 रा=ीय ि>ड के िवकास और तटीय एवं िपट-हडे ,े9% म(cid:25) प(cid:27)रकि@पत उ(cid:2)पादन प(cid:27)रयोजना(cid:31) के \ल(cid:9)टर से भारी मा9ा म(cid:25) कुशलपूव(cid:14)क िव(cid:17)ुत (cid:19)दायगी क इसक ,मता म(cid:25) 765केवी (cid:19)णाली क भूिमका अहम होगी। 11व8 योजना के दौरान ब#त सारे 765 केवी लाइन को जोड़ा गया ह ै और कुछ लाइन के िनमा(cid:14)णाधीन ह।" 765केवी (cid:19)णाली के बढ़ते Hझान का 12व8 योजना म(cid:25) भी बढ़ने क संभावना ह।ै ब#त सारे नए 765 केवी लाइन और उपक(cid:25)F% स े 300-600 मेगावाट िव(cid:17)ुत को लंबी दरू ी तक प#चं ान े क योजना बनाई गई ह।ै उनका वा(cid:9)तिवक काया(cid:14)(वयन संबंिधत उ(cid:2)पादन प(cid:27)रयोजना(cid:31) क (cid:19)गित पर िनभ(cid:14)र करेगा। 10व8 योजना क समाि^ से भारत म(cid:25) 765 केवी (cid:19)णाली का िवकास नीच े दशा(cid:14)या गया हःै¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 661 पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन ((((ससससीीीीककककेेेेएएएएमममम)))):::: 765 केवी 765 केवी 765 क ेवी 9% 1% 2% 400 केवी 400 क ेवी 44% 39% 220 केवी 220 केवी 400 केवी 220 क ेवी 54% 48% 43% 60% उउउउपपपपकककक(cid:19)(cid:19)(cid:19)(cid:19)3333 ((((एएएएममममववववीीीीएएएए)))):::: 765 क ेवी 76 05 % क ेवी 40 30 7 %केवी 2% 765 केवी 25% 400 के वी 38% 220 केवी 46% 220 केवी 60% 220 केवी 63% 400 केवी 29% 10व8 योजना 11व8 योजना 12व8 येाजना/शुHआती 13व8 योजना (योजना के अनुसार) 7777....11112222....2222 योिजत और 12व8 योजना के दौरान अथवा शुHआती 13व8 योजना म(cid:25) काया(cid:14)ि(वत क जान े वाली 765 केवी पारेषण (cid:19)णािलय% को िन`िलिखत ,े9वार सारणी म(cid:25) 'दया गया ह।ै इनम(cid:25) स े कुछ 765 केवी उपक(cid:25)F% को (cid:19)ारंभ म(cid:25) 400केवी पर (cid:19)चािलत 'कया जाएगा। उनका 765केवी (cid:19)चालन संबंिधत उ(cid:2)पादन प(cid:27)रयोजना(cid:31) क (cid:19)गित पर िनभ(cid:14)र करेगा। 7777....11112222....3333 उउउउ====ररररीीीी (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ---- 777766665555ककककेेेेववववीीीी पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी:::: उउउउ====ररररीीीी (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे मममम (cid:19)(cid:19) (cid:19)(cid:19) 777766665555ककककेेेेववववीीीी (cid:11)(cid:11)(cid:11)(cid:11)ककककाााारररर 11110000वववव(cid:6)(cid:6)(cid:6)(cid:6) 11111111वववव(cid:6)(cid:6)(cid:6)(cid:6) 11112222वववव(cid:6)(cid:6)(cid:6)(cid:6)////शशशशु(cid:27)ु(cid:27)ु(cid:27)ु(cid:27) 11112222वववव(cid:6)(cid:6)(cid:6)(cid:6) ययययोोोोजजजजननननाााा ककककेेेे अअअअततंंततंं पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन ययययोोोोजजजजननननाााा कककक.... ययययोोोोजजजजननननाााा कककक.... आआआआततततीीीी 11113333वववव(cid:6)(cid:6)(cid:6)(cid:6) मममम//(cid:19)(cid:19)//(cid:19)(cid:19) शशशशु(cid:27)ु(cid:27)ु(cid:27)ु(cid:27)आआआआततततीीीी 11113333वववव(cid:6)(cid:6)(cid:6)(cid:6) ((((ममममू ू ू ू यययय ससससीीीीककककेेेेएएएएमममम मममम(cid:19)(cid:19))))(cid:19)(cid:19)) ससससममममााााििििSSSS पपपपरररर ससससममममााााििििSSSS पपपपरररर ययययोोोोजजजजननननाााा ककककेेेे ययययोोोोजजजजननननाााा मममम(cid:19)(cid:19) (cid:19)(cid:19) अअअअननननुमुमुमुमााााििििननननतततत ििििललललएएएए ययययोोोोििििजजजजतततत अनपारा-उIांव एस/सी 409 409 409 उIांव-अनपारा ‘बी’ को एस/सी 2 2 अनपारा ‘सी’ म(cid:25) (cid:9)थानांत(cid:27)रत करना 'कशनपुर-मोगा एल-1 (डN@य)ू एस/सी 275 275 275662 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 'कशनपुर-मोगा एल-2 (डN@य)ू एस/सी 287 287 287 (cid:27)टहरी-मेरठ लाइन-1 एस/सी 186 186 186 (cid:27)टहरी-मेरठ लाइन -2 एस/सी 184 184 184 (cid:27)टहरी पुDलग Dबद ुपर (cid:27)टहरी- 2xएस/सी 8 8 मेरठ लाइन-1 का एलआईएलओ (cid:27)टहरी पुDलग Dबद ुपर (cid:27)टहरी- 2xएस/सी 13 13 मेरठ लाइन-2 का एलआईएलओ फतेहपुर-आगरा एस/सी 334 334 बिलया-लखनऊ एस/सी 320 320 बिलया-लखनऊ (दसू री एस/सी 250 250 सीकेटी) लखनऊ-बरेली एस/सी 250 250 लखनऊ-बरेली(दसू री सीकेटी) एस/सी 270 270 बरेली-मेरठ 2xएस/सी 400 400 आगरा-मेरठ एस/सी 260 260 आगरा-झटीकरा एस/सी 240 240 झटीकरा-िभवानी एस/सी 80 80 िभवानी-मोगा एस/सी 273 273 मेरठ-िभवानी एस/सी 260 260 मेरठ-मोगा एस/सी 260 260 जयपुर-िभवानी 765केवी एस/सी 250 250 जयपुर-िभवानी 765केवी एस/सी 260 260 (दसू री सीकेटी) अंता पीपी - फागी (जयपुर 2Xएस/सी 450 450 दि,ण-आरवीपीएनएल) वाराणसी-कानपुर डी/सी 331 331 कानपुर-झटीकरा एस/सी 480 480¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 663 ओराई-बुलंदशहर-सोनीपत एस/सी 525 525 बारा-मेनपुरी 2Xएस/सी 700 700 मेनपुरी->ेटर नोएडा एस/सी 270 270 उIाव-मेनपुरी एस/सी 175 175 मेनपुरी-हापुड़ एस/सी 250 250 >ेटर नोएडा म(cid:25) आगरा – मेरठ एस/सी 20 20 का एलआईएलओ हापुड़->ेटर नोएडा एस/सी 50 50 फतेहपुर-आगरा (सासन के एस/सी 340 340 साथ) उउउउ(cid:24)(cid:24)(cid:24)(cid:24)रररर (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे मममम (cid:19)(cid:19) (cid:19)(cid:19)777766665555ककककेेेेववववीीीी उउउउपपपपकककक(cid:19)(cid:19)(cid:19)(cid:19)(cid:26)(cid:26)(cid:26)(cid:26) 11110000वववव(cid:30)(cid:30)(cid:30)(cid:30) ययययोोोोजजजजननननाााा कककक(cid:31)(cid:31)(cid:31)(cid:31) 11111111वववव(cid:30)(cid:30)(cid:30)(cid:30) 11112222वववव(cid:30)(cid:30)(cid:30)(cid:30)////शशशश$$ुु$$ुु आआआआततततीीीी 11112222वववव(cid:30)(cid:30)(cid:30)(cid:30) ययययोोोोजजजजननननाााा ककककेेेे अअअअततंंततंं ((((मममम(cid:28)(cid:28)ूू(cid:28)(cid:28)ूू यययय एएएएममममववववीीीीएएएए मममम))(cid:19)(cid:19)))(cid:19)(cid:19) ससससममममाााािििि!!!! पपपपरररर ययययोोोोजजजजननननाााा कककक(cid:31)(cid:31)(cid:31)(cid:31) 11113333वववव(cid:30)(cid:30)(cid:30)(cid:30) ययययोोोोजजजजननननाााा ककककेेेे मममम//(cid:19)(cid:19)//(cid:19)(cid:19)शशशश$$ुु$$ुु आआआआततततीीीी 11113333वववव(cid:30)(cid:30)(cid:30)(cid:30) ससससममममाााािििि!!!! पपपपरररर ििििललललएएएए ययययोोोोििििजजजजतततत ययययोोोोजजजजननननाााा मममम (cid:19)(cid:19) (cid:19)(cid:19)अअअअननननममुुममुु ााााििििननननतततत उ(cid:2)ाव 1000 1000 2000 आगरा 3000 3000 मेरठ 3000 3000 मेरठ (संवध(cid:8)न) 1500 1500 लखनऊ 3000 3000 फतेहपुर 3000 3000 बिलया 3000 3000 बरेली 3000 3000 (cid:10)टहरी 4500 4500 (cid:15)कशनपुर 3000 3000 मोगा (संवध(cid:8)न) 3000 3000 बारा (ि(cid:21)वचयाड)(cid:8) 3000 3000 िभवानी 2000 2000 झटीकलन 6000 6000 वाराणसी 3000 3000 कानपुर 3000 3000 ओराई 3000 3000664 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] जयपुर 3000 3000 फागी (जयपुर दि(cid:26)ण-आरवीपीएनएल) 3000 3000 अंता (बान(cid:8)) पीपी जयपुर 3000 3000 बुलंदशहर 3000 3000 हापुड़ 3000 3000 सोनीपत 3000 3000 मैनपुरी 2000 2000 (cid:29)ेटर नोएडा 3000 3000 7777....11112222....4444 पपपपििििDDDDममममीीीी (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ---- 777766665555ककककेेेेववववीीीी पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी:::: पपपपििििDDDDममममीीीी (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे मममम (cid:19)(cid:19) (cid:19)(cid:19) 777766665555ककककेेेेववववीीीी (cid:11)(cid:11)(cid:11)(cid:11)ककककाााारररर 11110000वववव(cid:6)(cid:6)(cid:6)(cid:6) 11111111वववव(cid:6)(cid:6)(cid:6)(cid:6) 11112222वववव(cid:6)(cid:6)(cid:6)(cid:6)////शशशशु(cid:27)ु(cid:27)ु(cid:27)ु(cid:27) 11112222वववव(cid:6)(cid:6)(cid:6)(cid:6) ययययोोोोजजजजननननाााा ककककेेेे पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन ययययोोोोजजजजननननाााा कककक.... ययययोोोोजजजजननननाााा कककक.... आआआआततततीीीी 11113333वववव(cid:6)(cid:6)(cid:6)(cid:6) अअअअततंंततंं मममम//(cid:19)(cid:19)//(cid:19)(cid:19) शशशशु(cid:27)ु(cid:27)ु(cid:27)ु(cid:27)आआआआततततीीीी ((((ममममू ू ू ू यययय ससससीीीीककककेेेेएएएएमममम मममम(cid:19)(cid:19))))(cid:19)(cid:19)) ससससममममााााििििSSSS पपपपरररर ससससममममााााििििSSSS पपपपरररर ययययोोोोजजजजननननाााा ककककेेेे 11113333वववव(cid:6)(cid:6)(cid:6)(cid:6) ययययोोोोजजजजननननाााा मममम (cid:19)(cid:19) (cid:19)(cid:19) ििििललललएएएए अअअअननननममुुममुु ााााििििननननतततत ययययोोोोििििजजजजतततत Tवािलयर-आगरा लाइन-1 एस/सी 128 128 128 Tवािलयर-आगरा लाइन -2 एस/सी 128 128 Tवािलयर-बीना लाइन -1 एस/सी 235 235 235 Tवािलयर-बीना लाइन -2 एस/सी 233 233 Tवािलयर-बीना लाइन -3 एस/सी 230 230 Tवािलयर-जयपुर 2xएस/सी 2xएस/सी 600 600 (cid:27)रहदं -III - Dव(cid:24)याचल डी/सी 64 64 जबलपुर-ओराई एस/सी 350 350 ओराई म(cid:25) सतना-वधा(cid:14) का 2xएस/सी 60 60 एलआईएलओ ििििससससपपपपतततत-ििििससससववववननननीीीी लाइन-1 एस/सी 351 351 ििििससससपपपपतततत-ििििससससववववननननीीीी लाइन -2 एस/सी 354 354 ििििससससववववननननीीीी-बीना एस/सी 293 293 ििििससससववववननननीीीी-वधा(cid:14) लाइन-1 एस/सी 269 269 ििििससससववववननननीीीी-वधा(cid:14) लाइन -2 एस/सी 261 261 Dव(cid:24)याचल पुल-सतना 2xएस/सी 499 499¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 665 सतना-Tवािलयर 2xएस/सी 723 723 Dव(cid:24)याचल पुल-सासन एस/सी 6 6 सासन-सतना लाइन-I एस/सी 257 257 सासन-सतना लाइन -II एस/सी 260 260 सतना-बीना लाइन-I एस/सी 274 274 सतना-बीना लाइन -II एस/सी 276 276 बीना-इंदौर एस/सी 303 303 वधा(cid:14)-जबलपुर पुDलग (cid:9)टेशन डी/सी 700 700 रायगढ़(को[ा)- चंपा एस/सी 105 105 रायगढ़ (को[ा)- डी/सी 50 50 रायगढ़(तमनार) रायपुर-वधा(cid:14) 2Xडी/सी 1520 1520 वधा(cid:14)-औरंगाबाद 2Xडी/सी 1420 1420 औरंगाबाद-पडघे डी/सी 279 279 रायगढ़ पीएस(को[ा)–रायपुर डी/सी 250 250 पीएस चंपा पीएस – रायपुर पीएस डी/सी 150 150 चंपा पीएस – धम(cid:14)जयगढ़ एस/सी 50 50 इंदौर – वडोदरा 765केवी एस/सी 293 293 एस/सी धम(cid:14)जयगढ़ / कोरबा के िनकट – 2xडी/सी 1500 1500 जबलपुर पुल जबलपुर पुDलग क(cid:25)F – बीना डी/सी 473 473 जबलपुर पुDलग क(cid:25)F – भोपाल एस/सी 260 260 भभभभोोोोपपपपाााालललल----इइइइंंंंददददौौौौरररर एस/सी 173 173 शोलापुर-पुणे एस/सी 269 269 औरंगाबाद-धुले (आईपीटीसी) एस/सी 188 188 धुले (आईपीटीसी) – वडोदरा एस/सी 260 260 (पीजी)666 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ितरोदा (ग%िडया) – कोरादी III 2xएस/सी 120 120 कोरादी III – अकोला-II 2xएस/सी 270 270 अकोला-II – औरंगाबाद (पीजी) 2xएस/सी 240 240 औरंगाबाद-II- औरंगाबाद डी/सी 60 60 शोलापुर-पुणे डी/सी 265 265 डN@यूआर पुDलग Dबद ु एस/सी 16 16 (िबलासपुर) म(cid:25) डN@यू आर म(cid:25) ििििससससपपपपतततत-ििििससससववववननननीीीी के दोन% सीकेटी का एलआईएलओ (िबलासपुर) पपपपििििDDDDममममीीीी (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे मममम (cid:19)(cid:19) (cid:19)(cid:19) 777766665555 ककककेेेेववववीीीी 11110000वववव(cid:6)(cid:6)(cid:6)(cid:6) 11111111वववव(cid:6)(cid:6)(cid:6)(cid:6) ययययोोोोजजजजननननाााा 11112222वववव(cid:6)(cid:6)(cid:6)(cid:6)////शशशशु(cid:27)ु(cid:27)ु(cid:27)ु(cid:27) 11112222वववव(cid:6)(cid:6)(cid:6)(cid:6) ययययोोोोजजजजननननाााा ककककेेेे अअअअततंंततंं उउउउपपपपकककक(cid:19)(cid:19)(cid:19)(cid:19)3333 ययययोोोोजजजजननननाााा कककक.... कककक.... ससससममममााााििििSSSS आआआआततततीीीी 11113333वववव(cid:6)(cid:6)(cid:6)(cid:6) मममम//(cid:19)(cid:19)//(cid:19)(cid:19) शशशशु(cid:27)ु(cid:27)ु(cid:27)ु(cid:27)आआआआततततीीीी 11113333वववव(cid:6)(cid:6)(cid:6)(cid:6) ययययोोोोजजजजननननाााा मममम (cid:19)(cid:19) (cid:19)(cid:19) ((((ममममू ू ू ू यययय एएएएममममववववीीीीएएएए मममम(cid:19)(cid:19))))(cid:19)(cid:19)) ससससममममााााििििSSSS पपपपरररर पपपपरररर ययययोोोोजजजजननननाााा ककककेेेे अअअअननननममुुममुु ााााििििननननतततत ििििललललएएएए ययययोोोोििििजजजजतततत ििििससससववववननननीीीी 4500 4500 ििििससससपपपपतततत 1500 1500 Tवािलयर 3000 3000 बीना 2000 2000 वधा(cid:14) 4500 4500 सतना 2000 2000 इंदौर 3000 3000 Dव(cid:24)याचल पुDलग क(cid:25)F 3000 3000 जबलपुर पुल 3000 3000 शोलापुर 3000 3000 पुणे 3000 3000 औरंगाबाद (पीजी) 3000 3000 औरंगाबाद - II 3000 3000¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 667 पडघे (पीजी) 3000 3000 वडोदरा 3000 3000 डN@यूआर पुDलग क(cid:25)F- (ििििससससपपपपतततत के 3000 1500 4500 िनकट) रायपुर पुDलग क(cid:25)F 1500 1500 रायगढ़ (को[ा) पुDलग क(cid:25)F 6000 6000 रायगढ़(तमनार) पुDलग क(cid:25)F 4500 4500 धम(cid:14)जयगढ़ 4500 4500 चंपा पुDलग क(cid:25)F 9000 9000 धुले (आईपीटीसी) 3000 3000 भभभभोोोोपपपपाााालललल पपपप--ुु--ुु ललललगगगग कककक(cid:19)(cid:19)(cid:19)(cid:19)3333 3000 3000 ितरोदा 3000 3000 कोरादी 3000 3000 अकोला 1500 1500 7777....11112222....5555 ददददिििि(cid:15)(cid:15)(cid:15)(cid:15)णणणणीीीी (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे –––– 777766665555ककककेेेेववववीीीी पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी:::: 11110000वववव(cid:30)(cid:30)(cid:30)(cid:30) 11111111वववव(cid:30)(cid:30)(cid:30)(cid:30) ददददिििि(cid:15)(cid:15)(cid:15)(cid:15)णणणणीीीी (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे मममम (cid:19)(cid:19) (cid:19)(cid:19) (cid:11)(cid:11)(cid:11)(cid:11)ककककाााारररर 11112222वववव(cid:6)(cid:6)(cid:6)(cid:6)////शशशशु(cid:27)ु(cid:27)ु(cid:27)ु(cid:27)आआआआततततीीीी 11112222वववव(cid:6)(cid:6)(cid:6)(cid:6) ययययोोोोजजजजननननाााा ककककेेेे अअअअततंंततंं ययययोोोोजजजजननननाााा कककक(cid:31)(cid:31)(cid:31)(cid:31) ययययोोोोजजजजननननाााा कककक(cid:31)(cid:31)(cid:31)(cid:31) 777766665555ककककेेेेववववीीीी पपपपााााररररेेेेषषषषणणणण 11113333वववव(cid:6)(cid:6)(cid:6)(cid:6) ययययोोोोजजजजननननाााा ककककेेेे मममम//(cid:19)(cid:19)//(cid:19)(cid:19) शशशशु(cid:27)ु(cid:27)ु(cid:27)ु(cid:27)आआआआततततीीीी 11113333वववव(cid:6)(cid:6)(cid:6)(cid:6) ययययोोोोजजजजननननाााा मममम (cid:19)(cid:19) (cid:19)(cid:19) ससससममममाााािििि!!!! पपपपरररर ससससममममाााािििि!!!! पपपपरररर ललललााााइइइइनननन ििििललललएएएए ययययोोोोििििजजजजतततत अअअअननननममुुममुु ााााििििननननतततत ((((ममममूलूलूलूलयय््यय्् ससससीीीीककककेेेेएएएएमममम मममम(cid:19)(cid:19))))(cid:19)(cid:19)) ित)वलम-कुनु(cid:14)ल एस/सी 342 342 ने@लोर पुDलग क(cid:25)F – डी/सी 600 600 कुनु(cid:14)ल कुनु(cid:14)ल – रायचूर एस/सी 116 116 कुनु(cid:14)ल – रायचूर (दसू री एस/सी 126 126 सीकेटी) वेमािगरी पुDलग क(cid:25)F – 2Xडी/ 1000 1000 ख€मम सी ख€मम-हदै राबाद 2Xडी/ 1000 1000 सी668 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] तुितको(cid:27)रन पुDलग क(cid:25)F– डी/सी 738 738 सलेम पुDलग क(cid:25)F सलेम – मधुिगरी एस/सी 221 221 नागापuणम पुDलग डी/सी 534 534 (cid:9)टेशन-सलेम सलेम – मधुिगरी 765 एस/सी 230 230 केवी एस/सी लाइन – 2 (तुितको(cid:27)रन एलटीओए प(cid:27)रयोजना के साथ योिजत लाइन-1) मधुिगरी-नर(cid:25)F डी/सी 700 700 ख€मम- हदै राबाद 2xडी/ 1000 1000 सी हदै राबाद- वधा(cid:14) डी/सी 800 800 नर(cid:25)F - को@हापुर डी/सी 500 500 lीकाकुलम पीपी- डी/सी 700 700 वेमािगरी-II lीकाकुलम पीपी - डी/सी 750 750 अंगुल 11110000वववव(cid:2)(cid:2)(cid:2)(cid:2) दि,णी ,े9 म(cid:25) 765केवी 11111111वववव(cid:6)(cid:6)(cid:6)(cid:6) 11112222वववव(cid:6)(cid:6)(cid:6)(cid:6)////शशशशु(cid:27)ु(cid:27)ु(cid:27)ु(cid:27)आआआआततततीीीी 11112222वववव(cid:6)(cid:6)(cid:6)(cid:6) ययययोोोोजजजजननननाााा ककककेेेे अअअअततंंततंं मममम//(cid:19)(cid:19)//(cid:19)(cid:19) शशशशु(cid:27)ु(cid:27)ु(cid:27)ु(cid:27)आआआआततततीीीी midsaæ ययययोोोोजजजजननननाााा कककक(cid:4)(cid:4)(cid:4)(cid:4) ययययोोोोजजजजननननाााा कककक.... 11113333वववव(cid:6)(cid:6)(cid:6)(cid:6) ययययोोोोजजजजननननाााा ककककेेेे 11113333वववव(cid:6)(cid:6)(cid:6)(cid:6) ययययोोोोजजजजननननाााा मममम (cid:19)(cid:19) (cid:19)(cid:19) अअअअननननममुुममुु ााााििििननननतततत ((((ममममू ू ू ू यययय एएएएममममववववीीीीएएएए मममम(cid:19)(cid:19))))(cid:19)(cid:19)) ससससममममाााािििि(cid:6)(cid:6)(cid:6)(cid:6) ससससममममााााििििSSSS पपपपरररर ििििललललएएएए ययययोोोोििििजजजजतततत पपपपरररर रायचूर 3000 3000 ने@लोर 3000 3000 कुनु(cid:14)ल 3000 3000 तुितको(cid:27)रन पुDलग क(cid:25)F 3000 3000 ित)वलम 3000 3000 सलेम 3000 3000¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 669 मधुिगरी 3000 3000 नागापuणम पुDलग क(cid:25)F 3000 3000 lीकालुकम 3000 3000 वेमािगरी (नया पुDलग क(cid:25)F) 6000 6000 ख€मम (नया पुDलग क(cid:25)F) 3000 3000 हदै राबाद (नया पुDलग क(cid:25)F) 3000 3000 7777....11112222....6666 पपपपूवूवूवूव0000 (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे –––– 777766665555 ककककेेेेववववीीीी पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी:::: पपपपूवूवूवूव0000 (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे मममम (cid:19)(cid:19) (cid:19)(cid:19) (cid:11)(cid:11)(cid:11)(cid:11)ककककाााारररर 11110000वववव(cid:6)(cid:6)(cid:6)(cid:6) 11111111वववव(cid:6)(cid:6)(cid:6)(cid:6) 11112222वववव(cid:6)(cid:6)(cid:6)(cid:6)////शशशशु(cid:27)ु(cid:27)ु(cid:27)ु(cid:27)आआआआततततीीीी 11112222वववव(cid:6)(cid:6)(cid:6)(cid:6) ययययोोोोजजजजननननाााा ककककेेेे अअअअततंंततंं 777766665555ककककेेेेववववीीीी पपपपााााररररेेेेषषषषणणणण ययययोोोोजजजजननननाााा कककक.... ययययोोोोजजजजननननाााा कककक.... 11113333वववव(cid:6)(cid:6)(cid:6)(cid:6) ययययोोोोजजजजननननाााा मममम//(cid:19)(cid:19)//(cid:19)(cid:19) शशशशु(cid:27)ु(cid:27)ु(cid:27)ु(cid:27)आआआआततततीीीी 11113333वववव(cid:6)(cid:6)(cid:6)(cid:6) ययययोोोोजजजजननननाााा ललललााााइइइइनननन (मू@य ससससममममााााििििSSSS पपपपरररर ससससममममााााििििSSSS पपपपरररर ककककेेेे ििििललललएएएए ययययोोोोििििजजजजतततत मममम (cid:19)(cid:19) (cid:19)(cid:19) अअअअननननममुुममुु ााााििििननननतततत सीकेएम म(cid:25)) गया-सासाराम एस/सी 148 148 अंगुल पीएस – 2xएस/सी 424 424 झारसुगुडा पीएस अंगुल पीएस – डी/सी 430 430 झारसुगुडा पीएस ितलैया-गया एस/सी 67 67 गया-बिलया एस/सी 228 228 ितलैया-बिलया डी/सी 300 300 (गया म(cid:25) एलआईएलओईडी 'कया जाने वाला सीकेटी) डी/सी लाइन रांची – 2xएस/सी 796 796 िबलासपुर(डN@य ू आर पी. एस.) धरमजयगढ़ म(cid:25) डी/सी 80 80670 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] रांची-िबलासपुर (डN@यूआर पी.एस) का एलआईएलओ रांची-धम(cid:14)जयगढ़ डी/सी 360 360 धम(cid:14)जयगढ़- डी/सी 152 152 झारसुगुडा पूव] ,े9 म(cid:25) 765केवी 11110000वववव(cid:6)(cid:6)(cid:6)(cid:6) ययययोोोोजजजजननननाााा 11111111वववव(cid:6)(cid:6)(cid:6)(cid:6) 11112222वववव(cid:6)(cid:6)(cid:6)(cid:6)////शशशशु(cid:27)ु(cid:27)ु(cid:27)ु(cid:27)आआआआततततीीीी 11113333वववव(cid:6)(cid:6)(cid:6)(cid:6) 11112222वववव(cid:6)(cid:6)(cid:6)(cid:6) ययययोोोोजजजजननननाााा ककककेेेे अअअअततंंततंं midsanz कककक.... ससससममममााााििििSSSS पपपपरररर ययययोोोोजजजजननननाााा कककक.... ययययोोोोजजजजननननाााा ककककेेेे ििििललललएएएए मममम//(cid:19)(cid:19)//(cid:19)(cid:19) शशशशु(cid:27)ु(cid:27)ु(cid:27)ु(cid:27)आआआआततततीीीी 11113333वववव(cid:6)(cid:6)(cid:6)(cid:6) ययययोोोोजजजजननननाााा (मू@य एमवीए म(cid:25)) ससससममममााााििििSSSS पपपपरररर ययययोोोोििििजजजजतततत मममम (cid:19)(cid:19) (cid:19)(cid:19) अअअअननननममुुममुु ााााििििननननतततत सासाराम 3000 3000 रांची 3000 3000 गया 3000 1500 4500 गया (संवध(cid:14)न) 1500 1500 अंगुल 6000 6000 अंगुल (संवध(cid:14)न) 1500 1500 झारसुगुडा 3000 3000 7777....11113333 11112222वववव(cid:6)(cid:6)(cid:6)(cid:6) ययययोोोोजजजजननननाााा //// 11113333वववव(cid:6)(cid:6)(cid:6)(cid:6) ययययोोोोजजजजननननाााा कककक.... आआआआररररंंंंििििभभभभकककक अअअअववववििििधधधध ककककेेेे ििििललललएएएए ययययोोोोजजजजननननाााागगगगतततत एएएएचचचचववववीीीीडडडडीीीीससससीीीी पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााििििललललययययाााा ंं ंं 7777....11113333....1111 11व8 योजना के दौरान बिलया-िभवाड़ी 2500 मेगावाट एचवीडीसी बाइपोल का एक पोल और तालचर-कोलार बाइपोल म(cid:25) 500 मेगावाट के उIयन का कार्य पूरा कर िलया गया ह।ै सम*पत पारेषण लाइन के )प म(cid:25) दसू रे एचवीडीसी बाइपोल अथा(cid:14)त मुंFा-मोDहदरगढ़ 2500 मेगावाट का िनमा(cid:14)ण िनजी ,े9 के अदानी समूह Pारा 'कया जा रहा ह।ै इस लाइन को 11व8 योजना अविध म(cid:25) पूरा 'कया गया था। 12व8 योजना अथवा शुHआती 13व8 योजना के दौरान और तीन एचवीडीसी (cid:19)णािलय% को पूरा करन े क योजना बनाई गई ह।ै ये ह " िवVनाथ च(cid:27)रयाली-अलीपुरPार-आगरा (600मेगावाट), चंपा-कु),े9 चरण- 1 (3000 मेगावाट) और रायगढ़-धुले(4000मेगावाट) । एचवीडीसी ट*मनल क मेगावाट ,मता तथा एचवीडीसी बाइपोल क लंबाई दोन% के संबंध म(cid:25) एचवीडीसी (cid:19)णाली क वृि- नीच े दशा(cid:14)ई गई हःै¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 671 एएएएचचचचववववीीीीडडडड(cid:9)(cid:9)(cid:9)(cid:9)ससससीीीी एएएएचचचचववववीीीीडडडड(cid:9)(cid:9)(cid:9)(cid:9)ससससीीीीूूूूणणणणाााा एएएएचचचचववववीीीीडडडड(cid:9)(cid:9)(cid:9)(cid:9)ससससीीीी टटटटििििममममनन$$नन$$ लललल 35000 30000 25000 20000 15000 10000 5000 0 10ववववीीीींं ंं ययययोोोोजजजजननननाााा कककक(cid:19)(cid:19)(cid:19)(cid:19) ससससममममाााािििि(cid:22)(cid:22)(cid:22)(cid:22) पपपपरररर 11ववववीीीींं ंं ययययोोोोजजजजननननाााा कककक(cid:19)(cid:19)(cid:19)(cid:19) ससससममममाााािििि(cid:22)(cid:22)(cid:22)(cid:22) 12ववववीीीींं//ंं//शशशशुु(cid:28)(cid:28)ुु(cid:28)(cid:28)आआआआततततीीीी 11113333ववववीीीीं ं ं ं ययययोोोोजजजजननननाााा पपपपरररर ककककेेेे ििििललललएएएए ययययोोोो""""जजजजतततत अतः 12व8 योजना/शुHआती 13व8 योजना क समाि^ पर ऐसा अनुमान ह ै 'क रा=ीय ि>ड म(cid:25) बैक-टू-बैक चार एचवीडीसी और 9 एचवीडीसी बाइपोल (cid:19)णािलयां ह%गी। 7777....11113333....2222 भभभभााााररररतततत कककक.... एएएएचचचचववववीीीीडडडडीीीीससससीीीी (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी औऔऔऔरररर इइइइससससकककक.... ययययोोोोजजजजननननाााा ननननीीीीचचचच ेे ेेससससााााररररणणणणीीीी मममम(cid:19)(cid:19) (cid:19)(cid:19) ददददीीीी जजजजाााा ररररहहहहीीीी हहहह:::ैै:ैै ममममौौौौजजजजददूूददूू औऔऔऔरररर ययययोोोोििििजजजजतततत ववववोोोो टटटटेेजजेेजज एएएएजजजजसस(cid:19)(cid:19)सस(cid:19)(cid:19) ीीीी 11110000वववव(cid:6)(cid:6)(cid:6)(cid:6) 11111111वववव(cid:6)(cid:6)(cid:6)(cid:6) 11112222वववव(cid:6)(cid:6)(cid:6)(cid:6)////शशशशु(cid:27)ु(cid:27)ु(cid:27)ु(cid:27) 11112222वववव(cid:6)(cid:6)(cid:6)(cid:6)////11113333वववव(cid:6)(cid:6)(cid:6)(cid:6) ;ks ;ks एएएएचचचचववववीीीीडडडडीीीीससससीीीी पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन ////ततततरररर,,,, ककककेेेेववववीीीी जजजजननननाााा जजजजननननाााा कककक.... आआआआततततीीीी ययययोोोोजजजजननननाााा ककककेेेे ((((ममममू ू ू ू यययय ससससीीीीककककेेेेएएएएमममम मममम(cid:19)(cid:19))))(cid:19)(cid:19)) var कककक.... ससससममममााााििििSSSS पपपपरररर 11113333वववव(cid:6)(cid:6)(cid:6)(cid:6) ततततकककक ससससममममााााििििSSSS ययययोोोोजजजजननननाााा ककककेेेे ससससभभंंभभंं ााााििििववववतततत पपपपरररर ििििललललएएएए ययययोोोोििििजजजजतततत एएएएचचचचववववीीीीडडडडीीीीससससीीीी बबबबााााइइइइपपपपोोोोलललल ललललााााइइइइनननन:::: चंFपुर-पडघे ± 500केवी एमएसईबी 1504 1504 1504 (cid:27)रहदं -दादरी ± 500केवी पीजीसी 1634 1634 1634 आइएल तालचर-कोलार ± 500केवी पीजीसी 2734 2734 2734 आइएल बिलया-िभवाडी ± 500केवी पीजीसी 1580 1580 आइएल िवVनाथ-च(cid:27)रयाली आगरा ± 800केवी पीजीसी 3600 3600 आइएल672 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] चंपा-कु),े9 ± 800केवी पीजीसी 3700 3700 आइएल रायगढ़(को[ा)-धुले ± पीजीसी 2000 2000 600केवी आइएल अलपुरPार म(cid:25) िवVनाथ- ± 800केवी पीजीसी 140 140 आगरा का एलआईएलओ आइएल मुंFा-मोDहFगढ़ ± 500केवी अदानी 1980 1980 (यू पुगलुर-(य ू हदै राबाद ± 500केवी 1800 1800 ककककुुुुलललल 5555888877772222 9999444433332222 11111111222244440000 22220000666677772222 एएएएचचचचववववीीीीडडडडीीीीससससीीीी टटटटTTTTममममननननलललल (cid:11)(cid:11)(cid:11)(cid:11)ककककाााारररर एएएएजजजजसस(cid:19)(cid:19)सस(cid:19)(cid:19) ीीीी 11110000वववव(cid:6)(cid:6)(cid:6)(cid:6) 11111111वववव(cid:6)(cid:6)(cid:6)(cid:6) 11112222वववव(cid:6)(cid:6)(cid:6)(cid:6)////शशशशु(cid:27)ु(cid:27)ु(cid:27)ु(cid:27) 11112222वववव(cid:6)(cid:6)(cid:6)(cid:6)////11113333वववव(cid:6)(cid:6)(cid:6)(cid:6) ;ks ;ks var (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााा ((((बबबबााााइइइइपपपपोोोोलललल////बबबबककैैककैै ----टटटटूूूू---- जजजजननननाााा कककक.... जजजजननननाााा कककक.... आआआआततततीीीी ययययोोोोजजजजननननाााा ककककेेेे बबबबककैैककैै )))) ममममौौौौजजजजूदूदूदूद औऔऔऔरररर ययययोोोोििििजजजजतततत ससससममममााााििििSSSS पपपपरररर ससससममममााााििििSSSS पपपपरररर 11113333वववव(cid:6)(cid:6)(cid:6)(cid:6) ततततकककक ससससभभंंभभंं ााााििििववववतततत ((((ममममू ू ू ू यययय ममममगगेेगगेे ााााववववााााटटटट मममम))(cid:19)(cid:19)))(cid:19)(cid:19) ययययोोोोजजजजननननाााा ककककेेेे ििििललललएएएए ययययोोोोििििजजजजतततत चंFपुर-पडघे बाइपोल एमएसई 1500 1500 1500 बी (cid:27)रहदं -दादरी बाइपोल पीजीसी 1500 1500 1500 आइएल तालचर-कोलर बाइपोल पीजीसी 2000 2500 2500 आइएल बिलया-िभवाडी बाइपोल पीजीसी 1250 * 1250 2500 आइएल िवVनाथ-आगरा बाइपोल पीजीसी 3000 3000 आइएल चंपा-कु),े9 बाइपोल पीजीसी 3000 3000 आइएल रायगढ़(को[ा)-धुले बाइपोल पीजीसी # 4000 4000 आइएल अलपुरPार म(cid:25) िवVनाथ- बाइपोल पीजीसी * 3000 3000 आगरा का एलआईएलओ आइएल मुंFा-मोDहFगढ़ बाइपोल Adani 2500 2500¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 673 (यू पुगलुर-(य ू हदै राबाद बाइपोल 2500 2500 उउउउपपपप----ययययोोोोगगगग ((((बबबबााााइइइइपपपपोोोोलललल)))) 5555000000000000 6666777755550000 11119999222255550000 22226666000000000000 Dव(cid:24)याचल बैक टू बैक पीजीसी 500 500 500 आइएल चंFपुर बैक टू बैक पीजीसी 1000 1000 1000 आइएल गजुवाका बैक टू बैक पीजीसी 1000 1000 1000 आइएल सासाराम बैक टू बैक पीजीसी 500 500 500 आइएल उउउउपपपप----ययययोोोोगगगग ((((बबबबककैैककैै टटटटूूूू बबबबककैैककैै )))) 3333000000000000 3333000000000000 0000 3333000000000000 ककककुुुुलललल –––– एएएएचचचचववववीीीीडडडडीीीीससससीीीी 8888000000000000 9999777755550000 11119999222255550000 22229999000000000000 टटटटTTTTममममननननलललल (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााा # - 13व8 योजना म(cid:25) संभािवत काया(cid:14)(वयन * - 11व8 योजना म(cid:25) पूरी न क जा सकƒ 7777....11114444 ररररााााPPPP77 77 ीीीीयययय ििििKKKKडडडड मममम (cid:19)(cid:19) (cid:19)(cid:19)पपपपााााररररेेेेषषषषणणणण ककककेेेे ििििललललएएएए ववववोोोो टट ट ट ेेजजेेजज ककककेेेे उउउउUUUUचचचच ततततरररर ////तत तत रररर'''' ककककाााा (cid:11)(cid:11)(cid:11)(cid:11)ययययोोोोगगगग 7777....11114444....1111 उY वो@टेज के (cid:19)योग के प(cid:27)रणाम(cid:9)व)प राइट-ऑफ वे(आरओडN@य)ू क आव(cid:29)यकता म(cid:25) कमी आती ह ै \य%'क पारेषण वो@टेज (cid:9)तर म(cid:25) वृि- से आरओडN@य ू का मेगावाट (cid:19)ित मीटर म(cid:25) वृि- होती ह।ै उY वो@टेज के उपयोग से पारेषण ,ित म(cid:25) कमी होती ह ै \य%'क वो@टेज म(cid:25) वृि- के साथ पारेषण लाइन म(cid:25) धारा (कर(cid:25)ट) क कमी होती ह।ै उY वो@टेज शाट(cid:14) –सgकट (cid:9)तर भी कम वो@टेज उपक(cid:25)F% पर बना रहता ह।ै िविभI वो@टेज (cid:9)तर के िलए िनदशW ा(cid:2)मक आंकड़ े नीचे तािलकाब- 'कए गए हःै वो@टेज 132 केवी 220 केवी 400 केवी 765 केवी 1200 केवी आरओडN@य,ू मीटर(एम) 27 35 46 64 90 ,मता, (मेगावाट) 80 170 700 3000 8000 मेगावाट/एम 3 5 15 45 90 (अनुमािनत)674 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 7777....11114444....2222 1111222200000000 ककककेेेेववववीीीी पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी कारीडोर क िव(cid:17)ुत घनता बढ़ाने के िलए 1200 केवी एसी (cid:19)णाली को अगले उY एसी वो@टेज (cid:9)तर तक िवकिसत करन े का िनण(cid:14)य िलया गया ह।ै योजना (cid:19)यास के )प म(cid:25) औरंगाबाद और वधा(cid:14) के बीच उY ,मता पारेषण का(cid:27)रडोर क आव(cid:29)यकता को दखे ते #ए औरंगाबाद-वधा(cid:14) 400 केवी Lाड डी/सी लाइन जो 'क मुंFा/यूएमपीपी से िव(cid:17)ुत हटाने वाली पारेषण (cid:19)णाली का भाग ह,ै उसे इस तरह से योिजत और तैयार 'कया गया ह ै 'क बाद म(cid:25) इस लाइन को 1200 केवी एस/सी लाइन म(cid:25) प(cid:27)रव*तत 'कया जा सके। चूं'क 1200 केवी एसी (cid:19)ौ(cid:17)ोिगक तुलना(cid:2)मक )प से नई ह,ै इसिलए (cid:9)वदशे ी (cid:9)तर पर इसका िवकास करन े के िलए भारतीय िविनमा(cid:14)ता(cid:31) के साथ िमलकर पावरि>ड म(cid:24)य(cid:19)दशे के बीना म(cid:25) एक 1200 केवी यूएचवीएसी परी,ण (cid:9)टेशन क (cid:9)थापना कर रहा ह।ै इस परी,ण (cid:9)टेशन म(cid:25) दो 1200 केवी परी,ण लाइन (एस/सी+डी/सी) का िविनमा(cid:14)ण 'कया जा रहा ह ै िजसम(cid:25) अ>णी िविनमा(cid:14)ता [ांसफाम(cid:14)र, सज(cid:14)अरे(cid:9)टर, सgकट |ेकर, सीटीसीवीटी और पारेषण लाइन हाडव(cid:14) ेयर इ(cid:2)या'द जैस े उपकरण मुहयै ा करा रह े ह।" पावरि>ड (cid:9)थान, िसिवल फाउUडशे न, 1200 केवी लाइन, िनयं9ण और संर,ण (cid:19)णाली, परी,ण के िविभI उपकरण, सहायक और अि… सुर,ा (cid:19)णाली, 1200 केवी बुDशग इ(cid:2)या'द उपलNध कराएगा। इन िविनमा(cid:14)ता(cid:31) एवं पारंषण उपयोगकता(cid:14)(cid:31) Pारा िविभI ,े9ीय परी,ण% के िलए परी,ण बेज और परी,ण लाइन का उपयोग 'कया जाएगा ता'क उपयोिगता ,े9 म(cid:25) (cid:19)मािणत 1200 केवी (cid:19)णाली के उपकरण के भारत म(cid:25) िवकास के िलए इन प(cid:27)रणाम% और फ डबैक का उपयोग 'कया जा सके और इस ,े9 का (cid:19)ारंिभक (cid:19)चालना(cid:2)मक अनुभव (cid:19)ा^ 'कया जा सके। 7777....11115555 अअअअ 7777ाााा ममममगगेेगगेे ाााा ििििववववRRRRततुुततुु पपपप????ररररययययोोोोजजजजननननाााा ((((ययययएएूूएएूू ममममपपपपीीीीपपपपीीीी)))) ककककेेेे ििििललललएएएए पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी 7777....11115555....1111 बबबबWWWW----(cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ीीीीयययय ययययएएूूएएूू ममममपपपपीीीीपपपपीीीी अ@[ा मेगा िव(cid:17)ुत प(cid:27)रयोजना(cid:31) से (cid:19)ा^ होन े वाले िव(cid:17)ुत के लाभाथ] िजनम(cid:25) स े (cid:19)(cid:2)येक क ,मता लगभग 4000 मेगावाट ,मता ह,ै वे ह " दशे के अलग-अलग भाग% म(cid:25) अवि(cid:9)थत िविभI रा3य/यूएमपीपी जो 'क आव(cid:29)यक )प से ब#-,े9ीय उY ,मता प(cid:27)रयोजनाए ं होती ह," उनक पारेषण (cid:19)णाली भी एक से अिधक ,े9% म(cid:25) फैली #ई ह " और रा=ीय ि>ड के िवकास म(cid:25) भी उनका योगदान ह।ै आज क ि(cid:9)थित के अनुसार चार यूएमपीपी तैयार 'कए जा चुके ह।" ये ह-" (1) गुजरात म(cid:25) मुंFा यूएमपीपी, (2) म(cid:24)य (cid:19)दशे म(cid:25) सासन यूएमपीपी, (3) आंn (cid:19)दशे म(cid:25) कृ_णापuणम यूएमपीपी और (4) झारखंड म(cid:25) ितलैया यूएमपीपी। लाभा*थय% का िववरण उनके आवंटन के साथ िन`ानुसार हःै¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 675 (cid:9)(cid:9)(cid:9)(cid:9)मममम ललललााााभभभभााााथथथथ0000 रररराााा&&&&यययय ससससााााससससनननन ममममुं3ुं3ुं3ुं3ाााा ककककृृृृPPPPणणणणपपपपYYYYणणणणमममम ििििततततललललययैैययैै ाााा ((((झझझझााााररररखखखखडडंंडडंं )))) सससस..ंं..ंं ((((मममम....(cid:11)(cid:11)(cid:11)(cid:11)....)))) ((((गगगगजजुुजजुु रररराााातततत)))) ((((आआआआ....(cid:11)(cid:11)(cid:11)(cid:11)....)))) 1. 'द@ली 450 - - 150 2. उ<र (cid:19)दशे 500 - - 650 3. उ<रांचल 100 - - - 4. पंजाब 600 500 - 450 5. राज(cid:9)थान 400 400 - 250 6. ह(cid:27)रयाणा 450 400 - 200 7. म(cid:24)य(cid:19)दशे 1500 - - 200 8. छ<ीसगढ़ - - - - 9. गुजरात - 1900 - 300 10. महारा= - 800 800 300 11. कनाट(cid:14) क - - 800 - 12. तिमलनाडु - - 800 - 13. केरल - - - - 14. आंn (cid:19)दशे - - 1600 - 15. ओिडशा - - - - 16. झारखंड - - - 1000 17. िबहार - - - 500 ककककुुुुलललल 4444000000000000 4444000000000000 4444000000000000 4444000000000000 7777....11115555....2222 उउउउपपपपयययय((ु’ु’((ु’ु’ ययययएएूूएएूू ममममपपपपीीीीपपपपीीीी ककककेेेे ििििललललएएएए ययययोोोोििििजजजजतततत पपपपााााररररेेेेषषषषणणणण (cid:5)(cid:5)(cid:5)(cid:5)णणणणााााििििललललययययाााा ंं ंंएएएएवववव ंं ंंउउउउननननकककक(cid:31)(cid:31)(cid:31)(cid:31) िििि))))थथथथिििितततत ममममुंुं33ुंुं33ाााा ययययएएूूएएूू ममममपपपपीीीीपपपपीीीी : मुंFा यूएमपीपी के 2012-14 म(cid:25) शु) होन े क संभावना ह।ै उ(cid:2)पादन यूिनट क (cid:9)थापना के अनु)प चरणब- तीरके से पारेषण (cid:19)णाली क (cid:9)थापना क जा रही ह।ै पारेषण (cid:19)णाली का िववरण सारणी म(cid:25) 'दया गया ह ै (डN@यूआर-जीज-े 02, डN@यूआर-जीज-े 03 और डN@यआू र-जीजे-09)।676 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ससससााााससससनननन ययययूएूएूएूएममममपपपपीीीीपपपपीीीी: सासन यूएमपीपी के 2012-14 म(cid:25) शु) होन े क संभावना ह।ै उ(cid:2)पादन यूिनट क (cid:9)थापना के अनु)प चरणब- तीरके स े पारेषण (cid:19)णाली क (cid:9)थापना क जा रही ह।ै पारेषण (cid:19)णाली का िववरण सारणी म(cid:25) 'दया गया ह ै (डN@यूआर-एमपी-02 और डN@यूआर-जीजे-09)। ििििततततललललययैैययैै ाााा ययययूएूएूएूएममममपपपपीीीीपपपपीीीी: पारेषण (cid:19)णाली उ(cid:2)पादन यूिनट क (cid:9)थापना के अनु)प होगा। पारेषण (cid:19)णाली का िववरण सारणी म(cid:25) 'दया गया ह ै (ईआर-जेएच-05 और ईआर-जेएच-06)। ककककृृृृPPPPणणणणपपपपYYYYणणणणमममम ययययएएूूएएूू ममममपपपपीीीीपपपपीीीी: कृ_णपuणम यूएमपीपी पर काम को िवकासकता(cid:14)(cid:31) Pारा रोक 'दया गया ह।ै उ(cid:2)पादन प(cid:27)रयोजना म(cid:25) िवलंब के कारण पारेषण योजना को अलग कर उसका पुन(cid:14)सम)पण 'कया गया ह।ै उ(cid:2)पादन प(cid:27)रयोजना शु) करन े से पूव(cid:14) योिजत पारेषण (cid:19)णाली के कुछ त(cid:2)व% पर काम 'कया जा रहा ह।ै योिजत पारेषण (cid:19)णाली का िववरण सारणी म(cid:25) 'दया गया ह ै (एसआर-एपी-03 और एसआर-एपी-04) । भभभभििििववववPPPPयययय कककक.... पपपप????ररररययययोोोोजजजजननननााााएएएए––ंं––ंं चचचचZZेेZZेे ययययररूूररूू ((((ततततििििममममललललननननााााडडडडुुुु)))) ययययएएूूएएूू ममममपपपपीीीीपपपपीीीी,,,, ओओओओििििडडडडससससाााा ययययएएूूएएूू ममममपपपपीीीीपपपपीीीी औऔऔऔरररर छछछछ====ीीीीससससगगगगढ़ढ़ढ़ढ़ ययययएएूूएएूू ममममपपपपीीीीपपपपीीीी: ये प(cid:27)रयोजनाए ं अभी शु) नह8 क गई ह " \य%'क बोली (cid:19)'(cid:15)या अभी शु) नह8 'कया गया ह।ै इन प(cid:27)रयोजना(cid:31) के िलए (cid:19)ायेािगक पारेषण (cid:19)णािलय% क पहचान कर ली गई ह,ै तथािप इस द(cid:9)तावेज म (cid:25) इसे शािमल नह8 'कया गया ह।ै 7777....11116666 उउउउ++++ (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााा ििििवववव,,,,ततुुततुु पपपपााााररररेेेेषषषषणणणण ककककााााररररीीीीडडडडोोोोरररर ककककाााा मुZय )प स े ओिडशा, छ<ीसगढ़, िस'tम, झारखंड, म(cid:24)य(cid:19)दशे , तटीय आंn (cid:19)दशे और तिमलनाडु म(cid:25) ि(cid:9)थत उ(cid:2)पादन प(cid:27)रयोजना(cid:31) के समूह के िलए लंबी अविध तक अिधकतम उपयोग को (cid:24)यान म(cid:25) रखते #ए 11 उY ,मता िव(cid:17)ुत पारेषण प(cid:27)रयोजना कारीडोर योिजत 'कए गए थे। इन कारीडोर क सूची नीच े दी गई ह।ै आईपीपी उ(cid:2)पादन प(cid:27)रयोजना(cid:31) क (cid:9)थापना के अनु)प इन पारेषण कारीडोर क उ<रो<र (cid:9)थापना क जाएगी। इन कारीडोर का गठन करन े वाले पारेषण (cid:19)णाली त(cid:2)व% का उ@लेख इस अ(cid:24)याय के भाग 7.5-7.8 के अंतग(cid:14)त (cid:15)मशः संबंिधत उ(cid:2)पादन प(cid:27)रयोजना(cid:31) म(cid:25) 'कया गया ह।ै कारीडोरवार पारेषण त(cid:2)व% का उ@लेख अगले अ(cid:24)याय म(cid:25) संद*भत योजना के तहत 'कया गया ह।ै (I) ओिडशा म(cid:25) चरण-I म(cid:25) उ(cid:2)पादन प(cid:27)रयोजना(cid:31) से संबंिधत पारेषण (cid:19)णाली (II) झारखंड म(cid:25) आईपीपी प(cid:27)रयोजना(cid:31) से संबंिधत पारेषण (cid:19)णाली (III) िस'tम म(cid:25) आईपीपी प(cid:27)रयोजना(cid:31) से संबंिधत पारेषण (cid:19)णाली (IV) म(cid:24)य (cid:19)दशे म(cid:25) िबलासपुर कॉ€Oले\स, छ<ीसगढ़ एवं आईपीपी म(cid:25) आईपीपी प(cid:27)रयोजना(cid:31) स े संबंिधत पारेषण (cid:19)णाली¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 677 (V) छ<ीसगढ़ म(cid:25) आईपीपी प(cid:27)रयोजना(cid:31) से संबंिधत पारेषण (cid:19)णाली (VI) कृ_णपuणम ,े9, आंn (cid:19)दशे म(cid:25) आईपीपी प(cid:27)रयोजना(cid:31) से संबंिधत पारेषण (cid:19)णाली (VII) तुितको(cid:27)रन ,े9, तिमलनाडु म(cid:25) आईपीपी प(cid:27)रयोजना(cid:31) से संबंिधत पारेषण (cid:19)णाली (VIII) lीकाकुलम ,े9, आंn (cid:19)दशे म(cid:25) आईपीपी प(cid:27)रयोजना(cid:31) से संबंिधत पारेषण (cid:19)णाली (IX) दसू रे ,े9% को िव(cid:17)ुत अअअअततंंततंं रण के िलए दि,णी ,े9% म(cid:25) आईपीपी प(cid:27)रयोजना(cid:31) से संबंिधत पारेषण (cid:19)णाली (X) दसू रे ,े9% को िव(cid:17)ुत अअअअततंंततंं रण के िलए दि,णी ,े9 के वेमािगरी ,े9 म(cid:25) आईपीपी प(cid:27)रयोजना(cid:31) से संबंिधत पारेषण (cid:19)णाली (XI) दसू रे ,े9% को िव(cid:17)ुत अअअअतंंंं रण के िलए दि,णी ,े9 के नागाप(cid:27)uणम/कु†ालोर ,े9 म(cid:25) आईपीपी प(cid:27)रयोजना(cid:31) से संबंिधत पारेषण (cid:19)णाली 7777....11117777 11112222वववव(cid:6)(cid:6)(cid:6)(cid:6) ययययोोोोजजजजननननाााा अअअअववववििििधधधध ककककेेेे ििििललललएएएए पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ििििववववककककाााासससस ककककाााायययय(cid:9)(cid:9)(cid:8)(cid:8)(cid:9)(cid:9)(cid:8)(cid:8) मममम 12व8 योजनाविध के दौरान, पारेषण लाइन का लगभग 107440 सgकट 'कलोमीटर (सीकेएम) पारेषण लाइन,,,, 2,70,000 एमवीए एसी प(cid:27)रवत(cid:14)न ,मता और 12750 मेगावाट क एचवीडीसी (cid:19)णािलय% को जोड़ े जान े का अनुमान ह।ै इस पारषण िव(cid:9)त ार क मुZय बात ह ै नई एचवीडीसी बाइपोल (cid:19)णािलया ं जोड़ना और 765 केवी पारेषण (cid:19)णािलय% क ,मता बढ़ाना। 12व8 योजना के दौरान 27000 सीकेएम 765 केवी लाइन और 149000 एमवीए प(cid:27)रवत(cid:14)न ,मता क वृि- अनुमािनत ह ै । 765 केवी (cid:19)णाली म(cid:25) ऐसी भारी वृि- मुZय त: िपट-हडे और तटीय ,े9% म(cid:25) उ(cid:2)प ादन प(cid:27)रयोजना(cid:31) के समूह से िव(cid:17)ुत हटान े के िलए योिजत ब#त सारी पुDलग और िड-पुDलग क(cid:25)F% एवं लंबी दरू ी क पारेषण लाइन के मा(cid:24)य म से उ(ह (cid:25) दशे के भार क(cid:25)F% तक प#चं ाने क योजना के कारण #आ ह।ै उपयु(cid:14)\त के अलावा, 12व8 योजना अविध के दौरान (cid:15)मश: 45000 सीकेएम क 400 केवी लाइन, 35000 सीकेएम क 220 केवी लाइन और 45000 एमवीए एवं 76000 एमवीए क वृि- 'कए जान े का अनुमान ह।ै 220 केवी (cid:19)णािलयां अनुमािनत ह " और िपछले Hझान% पर आधा(cid:27)रत ह", और इसे एसटीय ू Pारा 12व8 योजना पारेषण काˆ(cid:15)म तैयार 'कए जाने के बाद पूरा 'कया जाएगा। 66केवी, 110 केवी और 132 केवी (cid:19)णािलय% क ,मता म(cid:25) भी वृि- क जाएगी। िन€न िलिखत सारणी 11व8 योजना अविध के दौरान भारत म(cid:25) पारेषण (cid:19)णाली (220 केवी और इससे अिधक के वो@ट ेज (cid:9)त र) िवकास और 12व8 योजना अविध के दौरान इसम(cid:25) क जाने वाली वृि- के अनुमान को दशा(cid:14)ती ह।ै इन अनुमान% म(cid:25) 12व8 योजना के िलए 88 गीगा वाट उत् पादन क वृि- पर िवचार 'कया जा रहा ह:ै678 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 11112222वववव(cid:30)(cid:30)(cid:30)(cid:30) ययययोोोोजजजजननननाााा के अंत म # 11110000वववव(cid:30)(cid:30)(cid:30)(cid:30) 11व$ 11111111वववव(cid:30)(cid:30)(cid:30)(cid:30) 12व$ 11112222वववव(cid:30)(cid:30)(cid:30)(cid:30) योजना म# योजना के अनुमािनत पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन ((((एएएएससससीीीी ययययोोोोजजजजननननाााा ककककेेेे ययययोोोोजजजजननननाााा ककककेेेे ययययोोोोजजजजननननाााा ककककेेेे क’ जाने दौरान औऔऔऔरररर एएएएचचचचववववीीीीडडडडीीीीससससीीीी ददददोोोोनननन....)))) अंत म # अंत म # अअअअततंंततंं मममम (cid:19)(cid:19)(cid:19)(cid:19) वाली वृि* अनुमािनत अअअअननननममुुममुु ााााििििननननतततत ((((मममम(cid:28)(cid:28)ूू(cid:28)(cid:28)ूू यययय ससससीीीीककककेेेेएएएएमममम मममम))(cid:19)(cid:19)))(cid:19)(cid:19) वृि* 5872 3560 9432 7777444444440000 16872 एएएएचचचचववववीीीीडडडडीीीीससससीीीी बबबबााााइइइइपपपपोोोोलललल ललललााााइइइइनननन 777766665555 ककककेेेेववववीीीी 2184 3536 5250 22227777000000000000 32250 444400000000 ककककेेेेववववीीीी 75722 37645 106819 33338888000000000000 144819 222222220000 ककककेेेेववववीीीी 114629 25175 135980 33335555000000000000 170980 कुल पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन ,,,, ससससीीीीककककेेेेएएएएमममम 111199998888444400007777 66669999999922226666 222255557777444488881111 111100007777444444440000 333366664444999922221111 पपपपााााररररेेेेषषषषणणणण ललललााााइइइइनननन ((((222222220000 ककककेेेेववववीीीी औऔऔऔरररर उउउउसससससससस ेे ेेअअअअििििधधधधकककक (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााा ववववााााललललीीीी (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी)))) उउउउपपपपकककक(cid:19)(cid:19)(cid:19)(cid:19)3333 ((((222222220000 ककककेेेेववववीीीी औऔऔऔरररर उउउउसससससससस ेे ेेअअअअििििधधधधकककक (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााा ववववााााललललीीीी (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी)))) 11112222वववव(cid:6)(cid:6)(cid:6)(cid:6) ययययोोोोजजजजननननाााा के अंत म(cid:25) 11110000वववव(cid:6)(cid:6)(cid:6)(cid:6) 11व8 11111111वववव(cid:6)(cid:6)(cid:6)(cid:6) 12व8 योजना के 11112222वववव(cid:6)(cid:6)(cid:6)(cid:6) ययययोोोोजजजजननननाााा योजना दौरान अनुमािनत उउउउपपपपकककक(cid:19)(cid:19)(cid:19)(cid:19)3333((((एएएएससससीीीी)))) औऔऔऔरररर ययययोोोोजजजजननननाााा ययययोोोोजजजजननननाााा ककककेेेे अअअअततंंततंं मममम (cid:19)(cid:19) (cid:19)(cid:19) म(cid:25) क अनुमािनत वृि- अअअअननननममुुममुु ााााििििननननतततत एएएएचचचचववववीीीीडडडडीीीीससससीीीी टटटटTTTTममममननननलललल ककककेेेे अंत ककककेेेे अतं जाने ((((ममममू ू ू ू यययय एएएएममममववववीीीीएएएए////ममममेगेगेगेगााााववववााााटटटट मममम(cid:19)(cid:19))))(cid:19)(cid:19)) म(cid:25) वाली म(cid:25) वृि- एएएएचचचचववववीीीीडडडडीीीीससससीीीी टटटटTTTTममममननननलललल:::: एएएएचचचचववववीीीीडडडडीीीीससससीीीी बबबबककैैककैै ----टटटटूूूू----बबबबककैैककैै 3000 0 3000 0 3000 एएएएचचचचववववीीीीडडडडीीीीससससीीीी बबबबााााइइइइपपपपोोोोलललल टटटटTTTTममममपपपपलललल 5000 1750 6750 12750 19500 कुल एएएएचचचचववववीीीीडडडडीीीीससससीीीी टटटटTTTTममममननननलललल 8888000000000000 1111777755550000 9999777755550000 11112222777755550000 22222222555500000000 (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााा,,,, ममममेगेगेगेगााााववववााााटटटट एएएएससससीीीी उउउउपपपपकककक(cid:19)(cid:19)(cid:19)(cid:19)3333 25000 777766665555 ककककेेेेववववीीीी 0 25000 149000 174000 92942 58058 151027 444400000000 ककककेेेेववववीीीी 45000 196027 156497 67277 222222220000 ककककेेेेववववीीीी 76000 299774 223774 222244449999444433339999 111155550000333366662222 333399999999888800001111 कुल---- एएएएससससीीीी उउउउपपपपकककक(cid:19)(cid:19)(cid:19)(cid:19)3333 (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााा,,,, 222277770000000000000000 666666669999888800001111 एएएएममममववववीीीीएएएए¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 679 7777....11118888 11112222वववव(cid:6)(cid:6)(cid:6)(cid:6) ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ककककेेेे ििििववववककककाााासससस ककककेेेे ििििललललएएएए ििििननननिधय% क आआआआववववAAAAययययककककतततताााा 12व8 योजना के प(cid:27)रद(cid:29)ृ य म(cid:25) 88 गीगा वाट उ(cid:2)पादन अिभवृि- को (cid:24)यान म(cid:25) रखत े #ए, पारेषण (cid:19)णाली के िवकास के िलए कुल 2,00,000 करोड़ Hपए क िनिध आव(cid:29)यकता ह।ै 7777....11119999 ररररााााPPPP77 77 ीीीीयययय ििििKKKKडडडड मममम (cid:19)(cid:19) (cid:19)(cid:19)ननननववववीीीीककककररररणणणणीीीीयययय ऊऊऊऊजजजजाााा (cid:8)(cid:8) (cid:8)(cid:8)OOOOोोोोतततत ((((आआआआररररईईईईएएएएसससस)))) उउउउ9999पप पप ााााददददनननन ककककाााा एएएएकककक....ककककररररणणणण 7777....11119999....1111 रा_[ ीय ि>ड एवं िव(cid:17)ुत बाजार से एक करण आरईएस पारेषण योजनाए ं एकल योजनाए ं नह8 ह " और उ(ह (cid:25) रा_[ ीय ि>ड और/अथवा ,े9ीय/अिखल vko';drk(cid:5) भारतीय ि>ड से जोड़ े जाने क ह ै और यह मुZय त: अंत(cid:27)रत क जाने वाली िव(cid:17)ुत क मा9ा पर िनभ(cid:14)र करेगी। आरईएस ऊजा(cid:14) क चर (cid:19)कृित को दखे ते #ए इ(ह (cid:25) ि>ड क सहायता क भी आव(cid:29)य कता होती ह।ै एक करण िनिdत सीमा तक आरईएस उ(cid:2)प ादन क चरता को समायोिजत करने के िलए पारेषण और ि>ड सहायता को िव(cid:29)व सनीय बनाती ह ै । आरईए उ(cid:2)प ादन क चरता के समायोजना क सीमा ि>ड के आकार, (cid:19)कृित और (cid:19)चालन प-ित पर िनभ(cid:14)र करती ह।ै िवशेष )प से (i) आरईएस उ(cid:2)प ादन क मा9ा क तुलना म(cid:25) पारंप(cid:27)रक ऊजा(cid:14) kोत क मा9ा और उनक (cid:19)चालना(cid:2)म क िवशेषता, (ii) ि>ड क उ(cid:2)प ादन सुर,ा, (iii) आरईएस उ(cid:2)प ादन क Šय वहायत(cid:14) ा, (iv) पारेषण अंतरसंपक(cid:14) क सीमा(v) ि>ड कोड एवं ि>ड क (cid:19)चालन प-ित, (vi) संतुलन तं9, और (vii)िनयमन को समथ(cid:14) बनाने से (िबना 'कसी आंिशक अथवा फुल बैक डाउन िविभ(न मौसम/भार ,मता प(cid:27)रद(cid:29)ृ य के अंतग(cid:14)त) रा_[ ीय ि>ड म(cid:25) आरईएस के समायोजन क सीमा िनधा(cid:14)(cid:27)रत होगी। आरईएस के िलए भारत म(cid:25) िव(cid:17)ुत बाजार :::: भारत म(cid:25) िव(cid:17)तु बाजार को िविवध बना 'दया ह ै िजसम (cid:25) लंबी अविध, म(cid:24)य अविध और अ@प अविध क िव(cid:17)ुत खरीद करार जैसे िविभ(न (cid:19)कार के करार% के तहत िव(cid:17)ुत क खरीद क जाती है। ड-े अहडे िव(cid:17)ुत िविनमय का भी (cid:19)ावधान ह।ै भारतीय िव(cid:17)ुत ि>ड को (cid:19)णाली (cid:19)चालक के अन(cid:15)ु म के मा(cid:24)य म स े भारतीय िव(cid:17)ुत ि>ड कोड के अनुसार (cid:19)चािलत 'कया जाता ह।ै कोई क(cid:25)Fीय कमान िनयं9ण (cid:19)णाली नह8 ह ै और िनण(cid:14)य लेने को िवकेि(Fत 'कया गया ह ै िजसम(cid:25) (cid:19)(cid:2)य ेक रा3य /डीआईएससीओएम अपना भार उ(cid:2)प ादन संतुलन बनाए रखन े के िलए िज€म ेदार होगा। 'कसी िनगम Pारा समय पर अनसु ूची से अलग होन े का मामला यूआई तं9 के मा(cid:24)य म से वािणि3यक )प स े सलु झाया जाता ह।ै नवीकरणीय ऊजा(cid:14) उ(cid:2)प ादक को िव(cid:17)ुत बाजार म(cid:25) खरीददार क खोज के िलए बातचीत करनी होगी। इसके पास (cid:9)थ ानीय डीआईएससीओएम के साथ (cid:19)ा थिमक टै(cid:27)रफ संिवदा अथवा बाजार टै(cid:27)रफ संिवदा (cid:9)व ीकार करने का िवक@प होगा। इसके पास अनुसूची के आधार पर अंतररा3य ीय संिवदा (cid:9)व ीकार करन े का भी िवक@प ह।ै <+ks चूं'क दशे क नवीकरणीय ,मता म(cid:25) भारी वृि- क जा रही ह ै और आने वाले वषi म(cid:25) इसम(cid:25) और ब (cid:2)त री होगी। यह अित आव(cid:29)य क ह ै 'क रिज(cid:9)[ ी के िस-ातं पर एक उपयु\त तं9 बनाया जाए िजसम (cid:25) नवीकरणीय ,मता के संबंध म(cid:25) पूण(cid:14) सूचना हो ता'क (cid:19)ारंभ होने क ितिथ और/अथवा कोई अ(य उपयु\त (cid:15)ाइटे(cid:27)रया पर आधा(cid:27)रत िनिdत (cid:19)कार/,मता के भाग को शािमल करते #ए (cid:19)ौ(cid:17)ोिगक य-वािणि3यक तं9 को आसानी स े काया(cid:14)ि(वत 'कया जा सके। आरईएस क प(cid:27)रवतन(cid:14) शीलता :::: (cid:19)(cid:2)य के डीआईएससीओएम/रा3य को एक पोट(cid:14)फोिलयो बनाना ह ै िजसम(cid:25) पारंप(cid:27)रक एवं नवीकरणीय ऊजा (cid:14) a kोत दोनो से उ(cid:2)प (न िव(cid:17)ुत शािमल होगी। अपने पोट(cid:14)फोिलयो अथवा िव(cid:17)ुत करार% का इ_ट तम तरीके स े (cid:19)बंधन एवं अपने भार-उ(cid:2)प ादन संतुलन का तरीके से (cid:19)बंधन एवं अपने भार-उ(cid:2)प ादन संतुलन का रखरखाव करने क िज€म ेदारी (cid:19)(cid:2)य ेक डीआईएससीओएम-रा3य क होगी। नवीकरणीय ऊजा(cid:14) kोत% स े680 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] (cid:19)ाOत िव(cid:17)ुत प(cid:27)रवतन(cid:14) शील होती ह ै और डीआईएससीओएम का अपनी िव(cid:17)ुत खरीद पोट(cid:14)फोिलयो क (cid:19)बंधन ,मता को भी (cid:19)भािवत करती ह।ै नवीकरणीय ऊजा(cid:14) kोत% स े (cid:19)ाOत िव(cid:17)ुत क उपलNध ता म (cid:25) प(cid:27)रवत(cid:14)न डीआईएससीओएम/रा3य सीमा म(cid:25) वा(cid:9)त िवक समय अिधक/कम खपत म(cid:25) (cid:19)कट होगी। य'द एसएलडीसी उqच वाय ु दाब के अंतग(cid:14)त अपने रा3य म(cid:25) पारंप(cid:27)रक उ(cid:2)प ादन को सहायता नह8 द े पाती ह ै तो इसके कारण आईएसटीएस पर भारी दवाब पड़गे ा और ि>ड सुर,ा को खतरा पैदा होगा। वत(cid:14)मान म (cid:25) 49.7 एचजेड से 50.2 एचजेड के '(cid:127)\व (cid:25)सी क अनुमित ह।ै वष(cid:14) 2014 तक नया ि>ड और एसआर ि>डको सम(cid:15)िमत 'कए जान े का अनुमान ह ै और तब तक पूरे दशे म (cid:25) 765 केवी लाइन का (cid:19)चालन श)ु होने क सभं ावना ह।ै िव(cid:17)तु (cid:19)णाली िव(cid:29)व सनीयता को दखे ते #ए '(cid:127)\व (cid:25)सी ब"ड को 49.8 से 50.1 एचजेड पर िनधा(cid:14)(cid:27)रत करना आव(cid:29)य क ह।ै ििििKKKKडडडड औऔऔऔरररर बबबबााााजजजजाााारररर ककककेेेे एएएएकककक....ककककररररणणणण ककककेेेे ििििललललएएएए ममममहहहह9999ववववपपपपूणूणूणूण (cid:8)(cid:8) (cid:8)(cid:8)तततत[[[[यययय:::: पपपपययययााााSS(cid:8)(cid:8)SS(cid:8)(cid:8) पपपपााााररररेेेेषषषषणणणण:::: यह िनतातं मह(cid:2)वपूण(cid:14) ह ै 'क दशे के अिधकांश भाग िवशेष )प स े जहां नवीकरणीय ऊजा (cid:14) kोत% पवन और सौर (cid:19)चुर मा9ा म(cid:25) उपलNध ह," वे सुदढ़ृ अंतर-रा3य और अतरा-रा3य पारेषण (cid:19)णािलय% से संब- ह% ता'क नवीकरणीय िव(cid:17)ुत क अिधक उपलNधता या कम आहरण अथवा अिधक आहरण के कारण (cid:19)णाली क िवफलता के मामले म(cid:25) पारेषण (cid:19)णाली पर कोई अित(cid:27)र(cid:129) बोझ न पड़।े इसके िलए कनेि\टिवटी और एलटीए िविनयम% म(cid:25) आरई उ(cid:2)पादन स े संबंिधत (cid:19)ावधान% के अनुसार आरई उ(cid:2)पादन के kZ िलए आईएसटीएस कनेि\टिवटी और पय ^ अंतर-रा3यीय िव(cid:17)ुत हटाने क (cid:19)णाली उपलNध कराई जाएगी। इसी तरह रा3य% को आरई िव(cid:17)ुत के िवतरण के िलए पया(cid:14)^ ् अंतरा-रा3य पारेषण (cid:19)णाली kS िवकिसत करनी चािहए अ र िसफ(cid:14) आईएसटीएस पर िनभ(cid:14)र नह8 रहना चिहए। अ(cid:2)यिधक नवीरकणीय ऊजा(cid:14) उ(cid:2)पादन क ि(cid:9)थित म(cid:25) रा3य अपने पारंप(cid:27)रक/थम(cid:14)ल पावर (cid:9)टेशन को बंद करने/आंिशक भार पर चलान े के बारे म(cid:25) सोच सकती ह।ै िवVसनीयता एवं ि>ड सहायता के िलए रा3य% के मा(cid:24)यम से अित(cid:27)र(cid:129) आईएसटीएस कनेि\टिवटी उपलNध कराया जाए। पपपपूवूवूवूवाााानन(cid:8)(cid:8)नन(cid:8)(cid:8) ममुुममुु ाााानननन एएएएवववव ंं ंं अअअअननननससुुससुु चचूूचचूू नननन:::: इसके साथ ही अिधक यथाथ(cid:14)ता के साथ वायु और सौर ऊजा (cid:14) के संबंध म(cid:25) फाम(cid:14)वार एवं \ल(cid:9)टरवार जानकारी पहले से (cid:19)ा^ करन े के िलए संब- िनगम% Pारा पूवा(cid:14)नुमान करन े वाल े आधुिनक उपकरण होना आव(cid:29)यक ह ै ता'क पूव(cid:14)योिजत कार(cid:14)वाई क जा सके और नवीकरणीय ऊजा(cid:14) क प(cid:27)रवत(cid:14)नशीलता के कारण ि>ड पर पड़ने वाले (cid:19)भाव को कम 'कया जा सके। इसके वायु/सौर ऊजा(cid:14) का अिधक से अिधक उपयोग करन े म(cid:25) मदद िमलेगी। यह अंतर रा3यीय एवं अंतरारा3य दोन% क दिृ 2 से िव(cid:17)ुत क िब(cid:15) के िलए मह(cid:2)वपूण(cid:14) ह।ै आरई ऊजा(cid:14) के अंतर-रा3यीय अनुसूचन के िलए आईईजीसी के पास िवशेष (cid:19)बंध ह।ै ऊऊऊऊजजजजाााा (cid:8)(cid:8) (cid:8)(cid:8) ललललखखेेखखेे ााााककंंककंं नननन :::: अंतरा-रा3य सीमा(cid:31) पर ऊजा(cid:14) प#चं ाने एवं उसका िवतरण करन े के िलए आपसी जोड़ Dबद(cid:31)ु एवं अकाउंट पर अंतरापृ‹ मीटर के (cid:19)ित(cid:9)थापन के िलए रा3य िनगम% Pारा आव(cid:29)यक उपाय 'कया जाना आव(cid:29)यक ह।ै भभभभाााारररर----उउउउ9999पपपपााााददददनननन ससससततंंततंं ललुुललुु नननन:::: भिव_य म(cid:25) नवीकरणीय ऊजा(cid:14) का योगदान ब#त बड़ा होगा और हो सकता ह ै 'क इसक प(cid:27)रवत(cid:14)नशीलता को यू आई तं9 के मा(cid:24)यम से समायोजन संभव नह8 होगा। इन प(cid:27)रि(cid:9)थितय% म(cid:25)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 681 (cid:127) L(cid:25)सी के असामा(य )प से नीचे आने क ि(cid:9)थित म(cid:25) (cid:9)टोरेज टाइप हाइ~ो (cid:9)टेशन अथवा गैस टरबाइन अथवा (cid:19)ालनीय मांग (cid:19)बंधन संिवदा के (cid:19)चालन जैसे ह(cid:9)त,ेप के मा(cid:24)यम स े ि>ड िव(cid:17)ुत म(cid:25) आए अचानक प(cid:27)रवत(cid:14)न का समायोजन करने के िलए उपयु(cid:129) नीित बनाया जाना आव(cid:29)यक ह।ै नवीकरणीय ऊजा(cid:14) के ,े9 म(cid:25) संपI रा3य के एसएलडीसी को अपने रा3य के भार-उ(cid:2)पादन संतुलन म(cid:25) स'(cid:15)या(cid:2)मक योगदान दने ा होगा। ऊऊऊऊजजजजाााा (cid:8)(cid:8) (cid:8)(cid:8) ससससKKंंKKंं हहहहनननन :::: नवीकरणीय उजा(cid:14) के ,े9 म(cid:25) संपI रा3य के िलए ताgकक भार-उ(cid:2)पादन संतुलन (cid:19)भावी )प से बनाए रखन े के िलए ऊजा(cid:14) सं>हन उपकरण/अ(य िवक@प रखना वांछनीय होगा। आआआआररररईईईईएएएएसससस ककककेेेे ििििललललएएएए ररररििििजजजज////7777ीीीी:::: यह अ(cid:2)यंत आव(cid:29)यक ह ै 'क रिज(cid:9)[ी के िस-ांत% पर एक उपयु(cid:129) सां(cid:9)थािनक j तं9 बनाया जाए िजसम(cid:25) (cid:9)प2 )प से नवीक णीय ,मता के संबंध म(cid:25) पूण(cid:14) सूचना उपलNध हो, ता'क (cid:19)ारंभ करन े क ितिथ और/अथवा कोई अ(य उपयु(cid:129) कसौटी के आधार पर ,मता के िनिdत (cid:19)कार/ भाग को शािमल करन े वाले 'कसी (cid:19)ौ(cid:17)ोिगक –वािणि3यक तं9 को सुगमता से काया(cid:14)ि(वत 'कया जा सके। 7777....11119999....2222 िििि1111डडडड ककककेेेे ससससााााथथथथ आआआआईईईईएएएएसससस उउउउ3333पपपपााााददददनननन ककककेेेे ििििललललएएएए ककककननननििेेििेे 4444टटटटववववटटटटीीीी ययययोोोोििििजजजजतततत ककककररररननननाााा (cid:9)थानीय ि>ड क सांि(cid:9)थक , नवीकरणयी ऊजा(cid:14) का (cid:9)थािनक िववरण एवं हटाए जान े वाले कुल िव(cid:17)ुत पर आधा(cid:27)रत मामला-दर-मामला आधार पर नवीकरणीय ऊजा(cid:14) उ(cid:2)पादन प(cid:27)रयोजना(cid:31) के िलए पारेषण योजना बनाई जानी ह।ै कुछ रा3य% के पास पया(cid:14)^ नवीकरणयी ऊजा(cid:14) kोत ह " जब'क दसू रे रा3य% के पास इसका अभाव ह।ै भारी मा9ा म(cid:25) नवीकरणीय ऊजा(cid:14) के उ(cid:2)पादन क ि(cid:9)थित म(cid:25) (cid:9)थानीय )प से उसका उपयोग करना संभव नह8 होता ह ै िवशेषकर जब उसक अिधक ज)रत नह8 होती ह।ै इसके िलए पारेषण (cid:19)णाली बनाए जाने क आव(cid:29)यकता ह ै िजसस े नवीरकणीय ऊजा (cid:14) उ(cid:2)पादन को रा3य ि>ड एवं अंतर-रा3य ि>ड से जोड़ा जाए। रा=ीय ि>ड के साथ आरईएस के एक करण से उY आरईएस उ(cid:2)पादन क अविध के दौरान पारंप(cid:27)रक उ(cid:2)पादन क ब"Œकग डाउन कम करन े और नवीकरणीय उ(cid:2)पादन क अनुपलNधता के समय (cid:9)थानीय भार क(cid:25)F% क मांग पूरा करन े म(cid:25) मदद िमलेगी बशतW 'क ि>ड के अ(य भाग% म(cid:25) भेजी जान े वाली ऊजा(cid:14) पया(cid:14)^ )प से अिधशेष हो। चूं'क मेगावाट के मामले म(cid:25) अिधकतर नवीरकणीय ऊजा(cid:14) kोत (आरईएस) उ(cid:2)पादन का आकार छोटा होता ह ै इसिलए उनका (cid:19)थम ि>ड से (cid:19)थम संपक(cid:14) 11केवी, 22केवी, 33 केवी और 66 केवी पर ही 'कया जाता ह।ै (cid:19)थम संपक(cid:14) Dबद ु के बाद ईएचवी पारेषण (cid:19)णाली 110केवी, 132केवी, 220 केवी अथवा 400 केवी पर 'कया जाता ह ै और यह ईएचवी उपक(cid:25)F% पर िलए जा रह े िव(cid:17)ुत क मा9ा पर िनभ(cid:14)र करता ह।ै 7777....11119999....3333 रररराााा6666ीीीीयययय िििि1111डडडड ककककेेेे ससससााााथथथथ आआआआररररईईईईएएएएसससस ककककेेेे एएएएकककक(cid:31)(cid:31)(cid:31)(cid:31)ककककररररणणणण ककककेेेे ििििललललएएएए ततततककककननननीीीीकककक(cid:31)(cid:31)(cid:31)(cid:31) ममममााााननननकककक सीईए ि>ड से जोड़ े जाने वाले पवन उ(cid:2)पादन के िलए तकनीक आव(cid:29)यकताए ं िविनgद2 करत े #ए कनेि\टवटी मानक% म(cid:25) मसौदा संशोधन जारी करन े वाला ह ै िजसके अनुसार उ(cid:2)पादन (cid:9)टेशन अलग-अलग स'(cid:15)य िव(cid:17)ुत सहायता क गितशील आपू*त म(cid:25) स,म ह%गे और िव(cid:17)ुत घटक को 0.95 लैDगग से 0.95682 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] िलDडग सीमा(cid:31) के भीतर रखा जा सकेगा। इसके अलावा, उ(cid:2)पादन (cid:9)टेशन% म(cid:25) फा@ट राइट के मा(cid:24)यम स े 300 िमली सेक(cid:25)ड क ,मता नह8 होगी ता'क ि>ड म(cid:25) बाधा आन े क ि(cid:9)थित म(cid:25) नवीकरणीय ऊजा(cid:14) के अचानक समाि^ से ि>ड अि(cid:9)थर न हो। मसौदा तकनीक मानक% म(cid:25) भी अिधकतम अनुकूल िव)पण के िलए मानको को भी िविनgद2 'कया गया ह।ै 7777....11119999....4444 रररराााा6666ीीीीयययय िििि1111डडडड ककककेेेे ससससााााथथथथ आआआआररररईईईईएएएएसससस ककककेेेे एएएएकककक(cid:31)(cid:31)(cid:31)(cid:31)ककककररररणणणण ककककेेेे ििििललललएएएए ििििववववििििननननययययमममम अनुसूचन और िवतरण के मामले म(cid:25) पवन और अनुसूचन और िवतरण के मामले म(cid:25) पवन और संयं9 म (cid:25) लचीलापन लान े के िलए सीईआरसी ने भातरीय िव(cid:17)तु ि>ड कोड को संशोिधत 'कया ह।ै सीईआरसी vo (अंतर-रा3य पारेषण और सबंिधत मामल% म(cid:25) कनेि\टिवटी, लंबी िध प#चं और म(cid:24)यम अविध खुल प#चं क मंजूरी दने ा) िविनयमन 2009 के अनुसार 50 मेगावाट स े 250 मेगावाट क ,मता के साथ नवीकरणीय ऊजा(cid:14) kोत% का (cid:19)योग करन े वाले उ(cid:2)पादन (cid:9)टेशन% के समूह भी अंतर-रा3य पारेषण (cid:19)णाली से (cid:19)(cid:2)य, कनेि\टवटी के िलए सीटीयू को आवेदन द े सकत े ह।" आरईएस स े िव(cid:17)ुत के अंतरण के िलए पारेषण शु@क लागू सीईआरसी टै(cid:27)रफ शतi के अनुसार होगा। सौर संयं9 जो'क 2014 म(cid:25) शु) 'कया जाना ह,ै के मामले म(cid:25) आरईएसटीएस शु@क/घाटा म(cid:25) छूट ह।ै पवन और सौर उ(cid:2)पादन िवकासकता (cid:14) उपयु(cid:14)(cid:129) (cid:19)ावधान% का लाभ ले सकत े ह " और अपनी प(cid:27)रयोजना(cid:31) स े िव(cid:17)ुत हटान े म(cid:25) बेहतर िवVसनीयता और अिखल-भारत आधार पर रा=ीय ि>ड से नवीकरणीय ऊजा(cid:14) क िब(cid:15) के िलए अपने आप को आइएसटीएस स े जोड़ सकत े ह।ै 7777....11119999....5555 11112222 वववव(cid:30)(cid:30)(cid:30)(cid:30) ययययोोोोजजजजननननाााा ककककेेेे ददददौौौौरररराााानननन आआआआररररईईईईएएएएसससस ककककेेेे एएएएकककक(cid:31)(cid:31)(cid:31)(cid:31)ककककररररणणणण ककककेेेे ििििललललएएएए पपपपााााररररेेेेषषषषणणणण (cid:5)(cid:5)(cid:5)(cid:5)णणणणााााििििललललययययाााा ंं ंं 9व8 योजना के अंत तक दशे म(cid:25) नवीरकणीय ऊजा(cid:14) उ(cid:2)पादन ,मता वृि- मा9 3475 मेगावाट थी। भारत सरकार तथा कई रा3य सरकार% न े नवीकरणीय ऊजा(cid:14) उ(cid:2)पादन के अनुकूल नीितया ं और काय(cid:14)(cid:15)म बनाए िजसको गित िमली एवं 11व8 योजना के अंत अथा(cid:14)त (माच(cid:14) 2012) तक ये ,मता 20,000 मेगावाट होगी। इनम(cid:25) स े अिधकतर नवीरकरणीय ,मता तिमलनाडु, महारा=, कना(cid:14)टक, गुजरात और राज(cid:9)थान जैस े रा3य% म(cid:25) ह " जो नवीकरणीय ऊजा(cid:14) के ,े9 म(cid:25) संपI रा3य ह।" वत(cid:14)मान म(cid:25) ये पांच रा3य दशे म(cid:25) (cid:19)ित(cid:9)थािपत 'कए गए कुल नवीकरणीय ,मता का 80% से अिधक ह।ै 12व8 येाजना अविध (2012-17) के िलए 19000-30000 मेगावाट क आरईएस वृि- अनुमािनत ह।ै नवीकरणीय ऊजा(cid:14) के ,े9 म(cid:25) संपI रा3य िहमाचल (cid:19)दशे , राज(cid:9)थान, गुजरात, महारा=, तिमलनाडु और आंn (cid:19)दशे के रा3य पारेषण िनगम% ने अपने रा3य% म(cid:25) आरईएस उ(cid:2)पादन प(cid:27)रयोजना(cid:31) के िलए पारेषण येाजनाए ं बना ली ह।ै सीईए ने इनम(cid:25) से कुछ एसटीयू के सहयोग से इन (cid:19)(cid:9)ताव% क जांच कर ली ह/ै कर रही ह ै और इ(ह (cid:25) योजना (cid:19)'(cid:15)या के अनुसार तैयार 'कया जाएगा। अभी तक तैयार क गई पारेषण (cid:19)णाली इस अ(cid:24)याय के अनुबंध 7.6 म(cid:25) दी गई ह।ै इस (cid:19)णाली को 12व8 योजना अविध के दौरान काया(cid:14)ि(वत करन े क योजना ह।ै य(cid:17)िप इन सभी आरईएस ,मता वृि- को संबंिधत रा3य% क आरपीओ (नवीकरणीय खरीद बा(cid:24)यता) आव(cid:29)यकता(cid:31) का पूरा करना ह,ै उनको (cid:19)(cid:2)य,/अ(cid:19)(cid:2)य, )प से आईएसटीएस के साथ जोड़ने का (cid:19)यास 'कया जा रहा ह ै ता 'क उपयु(cid:14)(cid:129) पैरा>ाफ म(cid:25) उ@लेिखत रा=ीय ि>ड का िह(cid:9)सा बन सक(cid:25)। आरईएस क कुल ,मता िजसके िलए¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 683 पारेषण योजना बनाई जा रही ह ै का काय (cid:14) (cid:19)गित पर ह ै और इसक ,मता 25000 मेगावाट ह ै (तिमलनाडु-6000 मेगावाट, आंn (cid:19)दशे -3000 मेगावाट, गुजरात-5500 मेगावाट, महारा=-5000 मेगावाट राज(cid:9)थान – 2800 मेगावाट, कना(cid:14)टक – 1600 मेगावाट और िहमाचल (cid:19)दशे -600 मेगावाट)। ऐसा (cid:141)ात #आ ह ै 'क नवीन और नवीकरणीय ऊजा(cid:14) मं9ालय (एमएनआरई) 12व8 योजनाविध (जो 19000-30000 क सीमा म(cid:25) ह)" के िलए आरईएस उ(cid:2)पादन वृि- क मा9ा और अवि(cid:9)थित का मू@यांकन कर रहा ह।ै इस मू@यांकन के बाद इन प(cid:27)रयोजना(cid:31) के िलए एक Bापक योजना बनाई जाएगी। भिव_य क आरई प(cid:27)रयोजना(cid:31) के िलए मुZयतः पवन और सौर ऊजा(cid:14) के उपयेाग क संभाBता को दखे ते #ए सापे, योजना अगले अ(cid:24)याय म(cid:25) दी गई ह ै । 7777....22220000 11113333वववव(cid:6)(cid:6)(cid:6)(cid:6) ययययोोोोजजजजननननाााा ककककेेेे ििििललललएएएए पपपपााााररररेेेेषषषषणणणण ििििवववव////तततताााारररर मममम ूू ूू ययययााााककंंककंं नननन उपयु(cid:14)(cid:129) 'दए गए िववरण के अनुसार एलटीए (cid:19)'(cid:15)या के अंतग(cid:14)त ब#त सारी उ(cid:2)पादन प(cid:27)रयोजना(cid:31) के िलए पारेषण (cid:19)णाली योिजत क गई ह ै िजनम(cid:25) से अिधकतर प(cid:27)रयोजना(cid:31) के 12व8 योजना के दौरान और शेष के 13व8 योजना के दौरान पूरा होन े का अनुमान ह ै और यह उ(cid:2)पादन प(cid:27)रयोजना क वा(cid:9)तिवक (cid:19)गित पर िनभ(cid:14)र होगा। 12व8 योजना के दौरान उ(cid:2)पादन प(cid:27)रयोजना और पारेषण (cid:19)णाली क (cid:19)गित और िवकास के आधार पर पहले से योिजत कुछ पारेषण (cid:19)णािलय% क समी,ा क जानी चािहए। ये समी,ा 13व8 योजना म(cid:25) आनेवाली िविश2 उ(cid:2)पादन प(cid:27)रयोजना(cid:31) के िलए नई पारेषण आव(cid:29)यकता(cid:31) क योजना के साथ क जाएगी। ऐसी ि(cid:9)थित म(cid:25) 13व8 योजना म(cid:25) संभािवत भार वृि- और (cid:19)दश(cid:14) उ(cid:2)पादन ,मता वृि- प(cid:27)रद(cid:29)ृ य पर िवचार करत े #ए ही 13व8 योजना के िलए पारेषण ,मता वृि- का मू@यांकन 'कया जाएगा। तदनुसार, 13व8 योजना के दौरान पारेषण ,मता वृि- िन`िलिखत मू@यांकन 'कया गया हःै 13व8 योजना के िलए पारेषण ,मता वृि- (220केवी और इसस े अिधक क ,मता वाली (cid:19)णाली के िलए): 1. पारेषण लाइन : 130 हजार सीकेएम 2. उपक(cid:25)F (प(cid:27)रणमन) ,मता : 300 हजार एमवीए 3. िनिध आव(cid:29)यकता : 200,000 करोड़ Hपए ****************************************684 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4]¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 685 अअअअ(cid:2)(cid:2)(cid:2)(cid:2)यय यय ाााा यययय –––– 7777कककक वववव(cid:7)(cid:7)(cid:7)(cid:7) ययययोोोोजजजजननननाााा पपपपााााररररेेेेषषषषणणणण ककककाााायययय(cid:18)(cid:18)(cid:17)(cid:17)(cid:18)(cid:18)(cid:17)(cid:17) मममम अअअअननननबबुुबबुु धधंंधधंं ----11112222 अअअअननननबबुुबबुु धधंंधधंं –––– 7777....1111 उ(cid:2)त री ,े9- पारेषण योजना िववरण n``<+h उउउउ9999तत तत ररररीीीी (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ----(cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ससससुुुु ककककररररणणणण ययययोोोोजजजजननननााााएएएए ंं ंं:::: ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----आआआआईईईईएएएएसससस----00001111 उ(cid:2)त री ि>ड के क(cid:25)Fीय भाग क 765 1. आगरा-मेरठ 765केवी एस/सी केवी (cid:19)णाली-भाग-। 2. आगरा-झ(cid:27)टकारा 765केवी एस/सी 3. झ(cid:27)टकारा-िभवानी 765केवी एस/सी 4. िभवानी-मोगा 765केवी एस/सी 5. झ(cid:27)टकारा म(cid:25) मुंडका/बवाना-बमनौली के दोन% सgकट का एलआईएलओ ततततााााििििललललककककाााा सससस..ंं..ंं ::::एएएएननननआआआआरररर----आआआआईईईईएएएएसससस----00002222 उ(cid:2)त री ि>ड के क(cid:25)Fीय भाग क 765 1. आगरा सब(cid:9)ट ेशन िव(cid:9)त ार माग(cid:14) िव(cid:9)त ार केवी (cid:19)णाली-भाग-।। 2. 4x1500 एमवीए 765/400 केवी के साथ झ(cid:27)टकारा म(cid:25) 765/400/220 केवी सब(cid:9)ट ेशन क (cid:9)थ ापना 3. 2x1500 एमवीए [ांसफामWशन ,मता के साथ मोगा और मेरठ 400/220 केवी सब(cid:9)ट ेशन का 765/400/220 केवी सब(cid:9)ट ेशन के )प म(cid:25) सुदढ़ृ ीकरण 4. झ(cid:27)टकारा म(cid:25) 240 एमवीएआर बस (cid:27)रए\ट र ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----आआआआईईईईएएएएसससस----00003333 उ(cid:2)त री ि>ड के क(cid:25)Fीय भाग क 765 1. मेरठ-िभवानी 765केवी एस/सी केवी (cid:19)णाली-भाग-।।। 2(क). 2x1000 एमवीए 765/400 केवी आईसीटी के साथ िभवानी म(cid:25) 765/400/220 केवी सब(cid:9)ट ेशन क (cid:9)थ ापना 2(ख). िभवानी म(cid:25) 2x315 एमवीए 400/220 केवी आईसीटी क (cid:9)थ ापना 3. िभवानी म(cid:25) बवाना/बहादरु गढ़-िहसार 400केवी डी/सी के दोन% सgकट का एलआईएलओ 4. मेरठ म(cid:25) बरेली-मंडौला 400केवीडी/सी के दोन% सgकट का एलआईएलओ 5. मंडौला बस ि(cid:9)पिलzटग 6. ब@ल भगढ़ बस ि(cid:9)पिलzटग686 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----आआआआईईईईएएएएसससस----00004444 उ(cid:2)त री ,े9 (cid:19)णाली सुदढ़ृ ीकरण 1. बागपत म(cid:25) नया 400/220 केवी सब(cid:9)ट ेशन (cid:9)थ ािपत करने के िलए योजना- XIX मेरठ-कैथल 400केवी डी/सी (\व ैद एचएसआईएल) के दोन% सgकट का एलआईएलओ 2. 2x500 एमवीए [ांसफामWशन ,मता के साथ बागपत म(cid:25) 400/220 केवी जीआईएस सब(cid:9)ट ेशन 3. कैथल म(cid:25) 80 एमवीएआर बस (cid:27)रए\ट र 4. बागपत म(cid:25) 125 एमवीएआर बस (cid:27)रए\ट र ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----आआआआईईईईएएएएसससस----00005555 उ(cid:2)त री ,े9 (cid:19)णाली सुदढ़ृ ीकरण 1. हमीरपुर म(cid:25) नया 400/220 केवी सब(cid:9)ट ेशन (cid:9)थ ािपत करने के िलए योजना-XX पाव(cid:14)ती पीएस-अमृतसर 400 केवी डी/सी के एक सgकट का एलआईएलओ 2. 2x315 एमवीए [ांसफामWशन ,मता के साथ हमीरपुर म(cid:25) 400/220 केवी सब(cid:9)ट ेशन ततततााााििििललललककककाााा सससस..ंं..ंं ::::एएएएननननआआआआरररर----आआआआईईईईएएएएसससस----00006666 उ(cid:2)त री ,े9 (cid:19)णाली सुदढ़ृ ीकरण 1. लखनऊ –बरेली 765 केवी एस/सी(सgकट-I) योजना-XXI 2. बरेली–काशीपुर 400 केवी डी/सी (\व ैद) 3. काशीपुर–)ड़क 400 केवी डी/सी (\व ैद) 4. )ड़क –सहारनपुर 400 केवी डी/सी (\व ैद) 5. बरेली म(cid:25) नया 765/400 केवी, 2x1500 एमवीए सब(cid:9)ट ेशन क (cid:9)थ ापना 6. बरेली–बरेली 400 केवी 2xडी/सी (\व ैद) ततततााााििििललललककककाााा सससस..ंं..ंं ::::एएएएननननआआआआरररर----आआआआईईईईएएएएसससस----00007777 उ(cid:2)त री ,े9 (cid:19)णाली सुदढ़ृ ीकरण 1. 'कशनपुर- संबा 400 केवी डी/सी योजना-XXII 2. दलु ह(cid:9)त ी-संबा 400 केवी एस/सी 3. संबा म(cid:25) नया 400/220 केवी, 2x315 एमवीए सब(cid:9)ट ेशन क (cid:9)थ ापना ततततााााििििललललककककाााा सससस..ंं..ंं ::::एएएएननननआआआआरररर----आआआआईईईईएएएएसससस----00008888 उ(cid:2)त री ,े9 (cid:19)णाली सुदढ़ृ ीकरण 1. महारानीबाग म(cid:25) 2x500 एमवीए [ांसफामWशन ,मता के साथ योजना-XXIII 400/220 केवी का िव(cid:9)त ार 2. लखनऊ म(cid:25)1x500 एमवीए [ांसफामWशन ,मता के साथ 400/220 केवी का िव(cid:9)त ार 4. बहादरु गढ़ म(cid:25) 1x500 एमवीए [ांसफामWशन ,मता के साथ 400/220 केवी का िव(cid:9)त ार ततततााााििििललललककककाााा सससस..ंं..ंं ::::एएएएननननआआआआरररर----आआआआईईईईएएएएसससस----00009999 उ(cid:2)त री ,े9 (cid:19)णाली सुदढ़ृ ीकरण 1. दहे रादनू -अNद @ु ल ापुर 400 केवी डी/सी (\व ैद)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 687 योजना-XXIV 2. दलु ह(cid:9)त ी-'कशनपुर 400 केवी डी/सी (\व ैद) – एकल सgकट (cid:9)[ ंग 3. बिलया अंत म(cid:25) बाढ़-बिलया 400 केवी डी/सी लाइन पर दो 63 एमवीएआर लाइन (cid:27)रए\ट र ((cid:19)(cid:2)य ेक सgकट पर एक) ततततााााििििललललककककाााा सससस..ंं..ंं ::::एएएएननननआआआआरररर----आआआआईईईईएएएएसससस----11110000 उ(cid:2)त री ,े9 (cid:19)णाली सुदढ़ृ ीकरण 1. जयपुर-िभवानी 765केवी एस/सी(िPतीय सgकट) योजना-XXV 2. िभवानी (पीजी)-िहसार 400केवी डी/सी लाइन 3. िहसार म(cid:25) 400केवी डी/सी मोगा-िभवानी लाइन का एलआईएलओ ततततााााििििललललककककाााा सससस..ंं..ंं ::::एएएएननननआआआआरररर----आआआआईईईईएएएएसससस----11111111 उ(cid:2)त री ,े9 (cid:19)णाली सुदढ़ृ ीकरण मेरठ-मोगा 765केवी एस/सी लाइन योजना-XXVI ततततााााििििललललककककाााा सससस..ंं..ंं ::::एएएएननननआआआआरररर----आआआआईईईईएएएएसससस----11112222 उ(cid:2)त री ,े9 (cid:19)णाली सुदढ़ृ ीकरण 1 पंचकुला म(cid:25) 400केवी डहे र-पानीपत एस/सी लाइन का योजना-XXVII एलआईएलओ 2 राजपुरा म(cid:25) 400केवी डहे र-िभवानी एस/सी लाइन का एलआईएलओ 3. (cid:27)टहरी(पीपी)-lीनगर 400केवी डी/सी लाइन (\व ैद) 4. अंता-कोटा 400केवी एस/सी लाइन को समाOत करने के िलए कोटा(पीजी) म(cid:25) एक 400केवी लाइन बे 5. चमेरा पूDलग Oव ाइंट म(cid:25) दो 220केवी लाइन बे ततततााााििििललललककककाााा सससस..ंं..ंं ::::एएएएननननआआआआरररर----आआआआईईईईएएएएसससस----11113333 उ(cid:2)त री ,े9 (cid:19)णाली सुदढ़ृ ीकरण 1. एक 400केवी डी/सी (\व ैद) िबहारशरीफ-सासाराम लाइन का योजना-XXVIII वाराणसी, बाइपाDसग सासाराम तक िव(cid:9)त ार 2. वाराणसी म(cid:25) गया-फतेहपुर 765 केवी एस/सी लाइन का एलआईएलओ 3. सासाराम- इलाहाबाद सgकट को पूव] ,े9 बस तक बढ़ाया जा सकता ह ै 4. एचवीडीसी बैक-टू-बैक के ज(cid:27)रए सासाराम-सारनाथ 400केवी एस/सी तक बढ़ाया जा सकता ह ै ततततााााििििललललककककाााा सससस..ंं..ंं ::::एएएएननननआआआआरररर----आआआआईईईईएएएएसससस----11114444 उ(cid:2)त री ,े9 बस (cid:27)रए\ट र योजना 1. गोरखपुर म(cid:25) 125 एमवीएआर बस (cid:27)रए\ट र 2. इलाहाबाद म(cid:25) 125 एमवीएआर बस (cid:27)रए\ट र 3. मिणपुर म(cid:25) 125 एमवीएआर बस (cid:27)रए\ट र 4. िहसार म(cid:25) 125 एमवीएआर बस (cid:27)रए\ट र 5. जालंधर म(cid:25) 125 एमवीएआर बस (cid:27)रए\ट र688 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 6. कंकरोली म(cid:25) 125 एमवीएआर बस (cid:27)रए\ट र 7. नालागढ़ म(cid:25) 125 एमवीएआर बस (cid:27)रए\ट र 8. Dव(cid:24)य ाचल (एनआर बस) म(cid:25) 2X125 एमवीएआर बस (cid:27)रए\ट र 9. अमृतसर म(cid:25) 80 एमवीएआर बस (cid:27)रए\ट र ततततााााििििललललककककाााा सससस..ंं..ंं ::::एएएएननननआआआआरररर----आआआआईईईईएएएएसससस----11115555 उ(cid:2)त री ,े9 म(cid:25) (cid:19)णाली सुदढ़ृ ीकरण 1. लखनऊ –बरेली 765केवी एस/सी लाइन (सgकट-II) (उ(cid:2)त री करणपुरा प(cid:27)रयोजना से 2. बरेली– मेरठ 765केवी एस/सी लाइन इस योजना को िडDलक करन े के बाद) 3. आगरा-गुड़गांव 400केवी डी/सी लाइन (\व ैद) 4. गुड़गांव म(cid:25) 2x500 एमवीए, 400/220केवी सब(cid:9)ट ेशन ततततााााििििललललककककाााा सससस..ंं..ंं ::::एएएएननननआआआआरररर----आआआआईईईईएएएएसससस----11116666 lीनगर(उ(cid:2)त राखंड) और (cid:27)टहरी के lीनगर-(cid:27)टहरी पूDलग (cid:9)ट ेशन 400 केवी डी/सी (\व ैद) बीच इंटर कने\श न उउउउ9999तत तत ररररीीीी (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ---- ििििननननPPPPकक कक षषषषणण(cid:8)(cid:8)णण(cid:8)(cid:8) ययययोोोोजजजजननननाााा :::: ततततााााििििललललककककाााा सससस..ंं..ंं ::::एएएएननननआआआआरररर----जजजजककेेककेे ेेेे----00001111 'कशन गंगा (330 मेगावाट) (के(F ीय 1. 'कशनगंगा-अिल(cid:9)त ांग 220केवी 2Xडी/सी लाइन ,े9) 2. अिल(cid:9)त ांग-(य ू वनपोह 220 केवी डी/सी लाइन 3. 'कशनगंगा- अमरगढ़ 220केवी डी/सी लाइन ततततााााििििललललककककाााा सससस..ंं..ंं ::::एएएएननननआआआआरररर----जजजजककेेककेे ेेेे----00002222 बघिलहार II (450 मेगावाट) बघिलहार एचईपी म(cid:25) 400केवी 'कशनपुर-(य ू वनपोह डी/सी लाइन के (रा3य ,े9) एक सgकट का एलआईएलओ ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----एएएएचचचचपपपपीीीी----00001111 पाब(cid:14)ती-II (800मेगावाट) 1. पाब(cid:14)ती II-कोलदाम (\ वैद) 400केवी (cid:19)थम सgकट (के(F ीय ,े9) 2. पाब(cid:14)ती II-कोलदाम (\व ैद) 400केवी िPतीय सgकट 3. पाब(cid:14)ती II- कोलदाम (\व ैद) डी/सी भाग ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----एएएएचचचचपपपपीीीी----00002222 रामपुर (412 मेगावाट) 1. रामपुर म(cid:25) 400 केवी डी/सी नाथपा-झाकरी-नालागढ़ का (के(F ीय ,े9) एलआईएलओ 2. लुिधयाना-प(cid:27)टयाला 400केवी डी/सी लाइन 3. कैथल म(cid:25) 400केवी डी/सी प(cid:27)टयाला-िहसार लाइन का एलआईएलओ¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 689 ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----एएएएचचचचपपपपीीीी----00003333 कोलदाम (800 मेगावाट) 1. कोलदाम-लुिधयाना 400केवी डी/सी (के(F ीय ,े9) 2. कोलदाम-नालागढ़ (क्व ैद) 400केवी डी/सी लाइन ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----एएएएचचचचपपपपीीीी----00004444 (cid:27)टडांग-I (100 मेगावाट) (िनजी (cid:27)टडांग-I एचईपी- कशांग 20केवी डी/सी लाइन ,े9) ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----एएएएचचचचपपपपीीीी----00005555 सोरंग (100 मेगावाट) (िनजी ,े9) सोरंग म(cid:25) एस/सी करचम-वांगटू-अNद @ु ल ापुर का एलआईएलओ ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----एएएएचचचचपपपपीीीी----00006666 यूएचएल-III(100 मेगावाट) िन€न वो@ट ेज पर िन_क ष(cid:14)ण (िनजी ,े9) ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----एएएएचचचचपपपपीीीी----00007777 कशांग I, II, III (3x65 मेगावाट) कशांग-जंगी पूDलग (cid:9)ट ेशन 220केवी डी/सी लाइन (रा3य ,े9) ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----एएएएचचचचपपपपीीीी----00008888 सवारा कुmडू (110 मेगावाट) सवारा कुmडू म(cid:25) नाथपा झाकरी-अNद @ु ल ापुर 400केवी डी/सी लाइन (रा3य ,े9) का एलआईएलओ ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----एएएएचचचचपपपपीीीी----00009999 कुटेहर (260 मेगावाट) 1.लाहल म(cid:25) 400/220 केवी, 2x315 एमवीए सब(cid:9)ट ेशन क (cid:9)थ ापना (िनजी ,े9) 2.कुटेहर-लाहल 220 केवी डी/सी लाइन 3.लाहल पीएस-चमेरा पीएस 400 केवी डी/सी लाइन ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----एएएएचचचचपपपपीीीी----11110000 बजोली होली एचईपी (180 चमेरा पूDलग Oव ाइंट तक एचपीपीटीसीएल (cid:19)णाली (कनेि\टिवटी) मेगावाट) ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----एएएएचचचचपपपपीीीी----11111111 कुिनहर (आंnा+ नोगली+माइ(cid:15)ो) िन` वो@टेज पर िन_क ष(cid:14)ण (196 मेगावाट) (िनजी ,े9) ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----एएएएचचचचपपपपीीीी----11112222 स"ज (100 मेगावाट) 1. स"ज-स"ज गांव (एचपीपीटीसीएल) 132केवी डी/सी लाइन (रा3य ,े9) 2. 400 केवी पाब(cid:14)ती-II- पाब(cid:14)ती पूDलग Oव ाइंट एस/सी लाइन का एलआईएलओ 3. स"ज 400/132केवी सब(cid:9)ट ेशन (150 एमवीए) क (cid:9)थ ापना690 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----पपपपीीीीबबबबीीीी----00001111 नाभा-राजपुरा टीपीएस (2x700 1. 2X315 एमवीए [ांसफाम(cid:14)र के साथ नाभा/प(cid:27)टयाला के समीप मेगावाट) (िनजी ,े9) 400/220 केवी सब(cid:9)ट ेशन का िनमा(cid:14)ण 2. तरनतारण से जालंधर 400 केवी डी/सी के समीप मु\त सर - सबसट ् ेशन 3. तरनतारण के समीप 400/220 केवी सब(cid:9)ट ेशन का िनमाण(cid:14) 4. मोहाली से जालंधर 400 केवी डी/सी के समीप नाभा/प(cid:27)टयाला - सब(cid:9)ट ेशन 5. मोहाली के समीप 400/220 केवी सब(cid:9)ट ेशन का िनमा(cid:14)ण 6. जालंधर स े जालंधर सब(cid:9)ट ेशन (पीजी) के समीप 400 केवी सब(cid:9)ट ेशन के बीच इंटरकने\श न 7. तरनतारण से अमृतसर सब(cid:9)ट ेशन (पीजी) के समीप 400 केवी सब(cid:9)ट ेशन के बीच इंटरकने\श न ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----पपपपीीीीबबबबीीीी----00002222 तलवंडी साबो (3x660 मेगावाट) 1. तलवंडी साबो - मु\त सर 400केवी डी/सी लाइन (िनजी ,े9) 2. मु\त सर - पuी– नकोडर 400केवी डी/सी लाइन 3. तलवंडी साबो - धु(cid:27)र 400केवी डी/सी लाइन 4. तलवंडी साबो - नकोडर 400 केवी डी/सी (मोगा 400केवी पीजीसीआईएल सब(cid:9)ट ेशन पर एक सgकट का एलआईएलओ) 5. 2X315 एमवीए मु\त सर सब(cid:9)ट ेशन क (cid:9)थ ापना 6. 2X315 एमवीए पuी सब(cid:9)ट ेशन क (cid:9)थ ापना 7. 2X315 एमवीए नकोडर सब(cid:9)ट ेशन क (cid:9)थ ापना ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----पपपपीीीीबबबबीीीी----00003333 गोDवदवाल साहबे (2x270 1. गोDवदवाल साहबे - 'फरोजपुर 220केवी डी/सी मेगावाट) 2. गोDवदवाल साहबे - खासा (अमृतसर) 220केवी डी/सी (िनजी ,े9) 3. गोDवदवाल साहबे - सु@त ानपरु लोधी 220केवी डी/सी 4. गोDवदवाल साहबे - कपूरथलाहासा 220केवी डी/सी ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----आआआआररररजजजज--ेे--ेे 00001111 आरएपीपी डी (2x700मेगावाट) 1. आरएपीपी–जयपुर (दि,ण) 400केवी डी/सी लाइन के एक सgकट (के(F ीय ,े9) का कोटा म(cid:25) एलआईएलओ (cid:9)थ ािपत करना 2. आरएपीपी – शुजालपुर (पिdम ,े9) 400केवी डी/सी लाइन 3. आरएपीपी-जयपुर एस/सी लाइन के आरएपीपी भाग के अंत म(cid:25)1x63एमवीएआर¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 691 4. आरएपीपी आरएपीपी-शुजालपुर डी/सी लाइन के आरएपीपी भाग के अंत म(cid:25) 1X50 एमवीएआर ((cid:19)(cid:2)य के सgकट) 5. आरएपीपी-डी उ(cid:2)प ादन म(cid:25) 125 एमवीएआर बस (cid:27)रए\ट र ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----आआआआररररजजजज--ेे--ेे 00002222 रामगढ़-II (160 मेगावाट) 1. रामगढ़- डचे ु 220केवी डी/सी लाइन ((cid:9)थ ािपत) (रा3य ,े9) 2. डचे ु – ितनवारी 220केवी एस/सी लाइन 3. डचे ु – फलोडी 220केवी एस/सी लाइन 4. डचे ु ((य ू) (2x100 एमवीए) म(cid:25) 220/132 केवी सब(cid:9)ट ेशन ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----आआआआररररजजजज--ेे--ेे 00003333 छाबड़ा (cid:9)ट ेशन-।। ( 500 मेगावाट) और कालीDसध टीपीएस( 2x600 मेगावाट) के िलए संयु\त िव(cid:17)तु िन_क ष(cid:14)ण (cid:19)णाली 765केवी वो@ट ेज (cid:9)त र पर (cid:19)णाली 1. फागी (जयपुर दि,ण) 3000 एमवीए, 765/400केवी सब(cid:9)ट ेशन के साथ 765केवीए, 3x80 एमवीएआर लाइन (cid:27)रए\ट र के दो सेट और 400केवी 1x125 एमवीएआर बस (cid:27)रए\ट र 2. अंता (बारन) पूDलग (cid:9)ट ेशन पर 400/765 केवी जीएसएस के साथ 765केवी, 3x80 एमवीएआर लाइन (cid:27)रए\ट र के दो सेट 3. अंता-फागी (जयपुर दि,ण) 765केवी 2xएस/सी लाइन 400केवी वो@ट ेज (cid:9)त र पर (cid:19)णाली 1. अजमेर म(cid:25) 400/220केवी सब(cid:9)ट ेशन जीएसएस 2. 400केवी डी/सी (\व ैद) लाइन पर कालीDसध-अंता पूDलग Oव ाइंट (कालीDसध टीपीएस के िलए) 3. 400केवी डी/सी (\व ैद) लाइन पर (छाबड़ा-अंता पूDलग O वांइट (छाबड़ा टीपीएस के िलए) 4. फागी (जयपुर दि,ण)-अजमेर 400केवी डी/सी लाइन 5. फागी (जयपुर दि,ण)-हीरापुरा 400केवी डी/सी लाइन 220 केवी वो@ट ेज (cid:9)त र पर (cid:19)णाली 1. अजमेर(400/220केवी) जीएसएस पर 220केवी अजमेर-बीवर लाइन का एलआईएलओ 2. अजमेर(400/220केवी) जीएसएस पर 220केवी अजमेर-'कशनगढ़ लाइन का एलआईएलओ 3. 'कशनगढ़-झालावार 220केवी डी/सी लाइन ('कशनगढ़ टीपीएस के िलए) ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----आआआआररररजजजज--ेे--ेे 00004444 बरDसगसर िव(cid:9)त ार (250मेगावाट) 1. बरDसगसर-नगौर 220केवी एस/सी लाइन (के(F ीय ,े9) 2. िखनवसर (नागौर) पर सब(cid:9)ट ेशन के साथ बरDसगसर-िखनवसर- भोपालगढ़ 220केवीएस/सी लाइन692 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 3. िखनवसर 220/132केवी सब(cid:9)ट ेशन क (cid:9)थ ापना ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----आआआआररररजजजज--ेे--ेे 00005555 lी िसम(cid:25)ट िलिमटेड (300 मेगावाट) 1. 80 एमवीएआर बस (cid:27)रए\ट र के साथ उ(cid:2)प ादन ि(cid:9)वचयाड (cid:14) पर (आईपीपी) कोटा-मे(cid:27)रआ 400केवी डी/सी लाइन के एक सgकट का एलआईएलओ (कनेि\टिवटी) ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----ययययककूूककूू ेेेे----00001111 तपोवन िव_ण ुगढ़ (520मेगावाट) 1. तपोवन िव_ण ुगढ़ एचईपी- कुंवारीपास 400केवी डी/सी लाइन (के(F ीय ,े9) 2. कुंवारीपास पर िव_ण ु (cid:19)याग-मुजJफरनगर 400 केवी डी/सी लाइन के एक सgकट का एलआईएलओ 3. कुंवारीपास-कण(cid:14)(cid:19)याग 400केवी डी/सी लाइन 4. कण(cid:14)(cid:19)याग-lीनगर 400केवी डी/सी लाइन 5. कण(cid:14)(cid:19)याग पर कुंवारीपास-lीनगर 400केवी डी/सी लाइन का एलआईएलओ ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----ययययककूूककूू ेेेे----00002222 Dसगोली भटवारी (99 मेगावाट) Dसगोली भटवारी म(cid:25) बारंवारी-lीनगर 220केवी डी/सी लाइन का (िनजी ,े9) एलआईएलओ ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----ययययककूूककूू ेेेे----00003333 फटा Nय %ग (76 मेगावाट) 1. फटा Nय %ग म(cid:25) गौरीकुंड रामवाड़ा –बारंबारी 132केवी एस/सी का (िनजी ,े9) एलआईएलओ 2. बारंबारी-lीनगर 220केवी डी/सी लाइन ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----ययययककूूककूू ेेेे----00004444 धौली गंगा +)पिसयाबागर 1. धौली गंगा – िपथौरागढ़ 220केवी डी/सी लाइन खािसयावाड़ा (260मेगावाट) 2. धौली गंगा - बरेली 220केवी डी/सी लाइन (के(F ीय ,े9) ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----ययययककूूककूू ेेेे----00005555 कोटिलभेल (cid:9)ट ेशन -1क और ख 1. कोटिलभेल ।। से कोटिलभेल 1क-दहे रादनू (पीटीसीयूएल) 220 (515 मेगावाट), कोटिलभेल केवी डी/सी िvवन/\व ैद लाइन (कोटिलभेल ।। तक िvवन और कोटिलभेल ।।-दहे रादनू -पीटीसीयूएल के बीच \व ैद) (cid:9)ट ेशन-।। (530 मेगावाट) (के(F ीय 2. कोटिलभेल ।ख म(cid:25) कोटिलभले 1क-दहे रादनू (पीटीसीयूएल) 220 ,े9) केवी डी/सी लाइन के एक सgकट का एलआईएलओ 3. पीटीसीयूएल के 220केवी दहे रादनू सब(cid:9)ट ेशन और पीजी के 400/220केवी दहे रादनू सब(cid:9)ट ेशन के बीच संपक(cid:14)। यह सपं क(cid:14) जोड़ े जाने वाले दो सब(cid:9)ट ेशन% क अवि(cid:9)थित के आधार पर या तो िव(cid:9)त ा(cid:27)रत बस अथवा 220केवी \व ैद डी/सी लाइन Pारा (cid:9)थ ािपत 'कया जाएगा।¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 693 4. कोटिलभेल एचईपी के िलए ,े9ीय योजना के )प म(cid:25) दहे रादनू - अNद @ु ल ापुर 400 केवी डी/सी लाइन ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----ययययककूूककूू ेेेे----00006666 (cid:27)टहरी-II(1000 मेगावाट) 1. (cid:27)टहरी पीएसपी – (cid:27)टहरी पूDलग (cid:9)ट ेशन (\व ैद) 400केवी एस/सी (के(F ीय ,े9) लाइन 2. 765केवीएस/सी लाइन पर (cid:27)टहरी पूDलग Oव ाइंट-मेरठ लाइन क चा(cid:144)जग 3. (cid:27)टहरी पुल पर 765/400 केवी, 3x1500 एमवीए सब(cid:9)ट ेशन क (cid:9)थ ापना ((cid:9)थ ान क सम(cid:9)य ा के कारण (cid:27)टहरी पूDलग (cid:9)ट ेशन जीआईएस मोड म(cid:25) होगा) 4. मेरठ म(cid:25) 765/400 केवी, 1x1500 एमवीए सब(cid:9)ट ेशन मेरठ म(cid:25) 765 केवी (cid:9)त र पर (cid:19)चालन के िलए सीरीज कैपेिसटर का संशोधन ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----ययययककूूककूू ेेेे----00007777 लता तपोवन (171 मेगावाट) लता तपोवन –जोशी मठ 220केवी डी/सी लाइन (के(F ीय ,े9) ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----ययययककूूककूू ेेेे----00008888 पाला मनेरी (480 मेगावाट) पाला मनेरी म(cid:25) लोहारी नागपाला-कोटे(cid:29)व र 400केवी डी/सी लाइन (रा3य ,े9) का एलआईएलओ ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----ययययककूूककूू ेेेे----00009999 #M+ lवंथी एनज] (cid:19)ाइवेट िलिमटेड उ(cid:2)प ादन ि(cid:9)वचयाड (cid:14) पर काशीपुर – क 400केवी डी/सी लाइन के (450 मेगावाट) एक सgकट का एलआईएलओ ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----ययययककूूककूू ेेेे----11110000 lीनगर (330 मेगावाट) 1. lीनगर - काशीपुर 400केवी डी/सी लाइन (िनजी ,े9) 2. lीनगर-एचईपी 400केवी डी/सी लाइन 3. lीनगर म(cid:25) िव_ण ु(cid:19)याग-मुजJफरनगर 400केवी लाइन का एलआईएलओ694 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----ययययूपूपूपूपीीीी----00001111 पिdमी ,े9 के (cid:27)रहदं एसटीपीपी- 1. (cid:27)रहदं -III- Dव(cid:24)य ाचल पूल 765 केवी डी/सी (शु)आत म(cid:25) 400 केवी ।।।(2X500 मेगावाट) और Dव(cid:24)य ाचल पर (cid:19)चािलत करने के िलए) एसटीपीपी -IV (2X500 मेगावाट) 2. Dव(cid:24)य ाचल-IV - Dव(cid:24)य ाचल पूल 400 केवी डी/सी (\व ैद) के िलए संयु\त (cid:19)णाली (के(F ीय ,े9). 3. Dव(cid:24)य ाचल पूल-सतना 765 केवी 2x एस/सी 4. सतना - Tव ािलयर 765 केवी 2xएस/सी 5. Tव ािलयर - जयपुर (दि,ण) 765 केवी एस/सी 6. Dव(cid:24)य ाचल पूल-सासन 765 केवी एस/सी 7. Dव(cid:24)य ाचल पूल म(cid:25) 765/400केवी, 2x1500 एमवीए सब(cid:9)ट ेशन क (cid:9)थ ापना ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----ययययूपूपूपूपीीीी----00002222 Dसगरौली (cid:9)ट ेशन-III (500मेगावाट) 1. Dसगरौली-इलाहाबाद 400केवी एस/सी लाइन 2. इलाहाबाद-कानपुर 400केवी डी/सी लाइन ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----ययययूपूपूपूपीीीी----00003333 बारा टीपीएस (3X660मेगावाट) 1 . बारा उ(cid:2)प ादन योजना क 765केवी (cid:9)त र तक (cid:9)थ ापना (िनजी ,े9), 2. बारा ि(cid:9)वचयाड (cid:14) म(cid:25) 2x1500एमवीए के साथ 765 केवी और 400 करछना (2x660मेगावाट) (िनजी केवी (cid:9)त र (7x500 एमवीए (cid:19)थम चरण यूिनट) 765/400 ,े9) और आईसीटी 3. 400/220केवी 2x315 एमवीए आईसीटी के साथ रीवा रोड मेजा जेवी (1320मेगावाट) इलाहाबाद म(cid:25) 400केवी सब(cid:9)ट ेशन क (cid:9)थ ापना (के(F ीय ,े9) के िलए संयु\त (cid:19)णाली 4. करचना और मेगा उ(cid:2)प ादन योजना क 400केवी (cid:9)त र तक (cid:9)थ ापना 5. रीवा रोड इलाहाबाद म(cid:25) 400केवी ओबरा-पनक लाइन का एलआईएलओ 6. मेजा-बारा 400केवी \व ैद डी/सी लाइन 7. मेजा-रीवा रोड (इलाहाबाद) 400केवी \व ैद डी/सी लाइन 8. करचना-बारा 400केवी \व ैद डी/सी लाइन 9. करचना-रीवा रोड (इलाहाबाद)) 400केवी \व ैद डी/सी लाइन 10. बारा-मैनपुरी 765केवी 2xएस/सी लाइन (cid:25) 11. मैनपुरी->ेटर नोएडा 765केवी एस/सी 12. >ेटर नोएडा म(cid:25) पीजीसीआईएल क आगरा-मेरठ 765केवी एस/सी लाइन का एलआईएलओ 13. हापुड़->ेटर नोएडा 765केवी एस/सी लाइन¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 695 14. 2x1000एमवीए ( 7x333 एमवीए, (cid:19)थम चरण यूिनट) आईसीटी के साथ मैनपुरी म(cid:25) नया 765/400केवी सब(cid:9)ट ेशन 15. मैनपुरी 765केवी यूपीपीसीएल – मैनपुरी 400केवी पीजीसीआईएल 400केवी \ वैद डी/सी लाइन 16. 2x1500एमवीए (7x500एमवीए (cid:19)थम चरण यूिनट) 765/400केवी के साथ >ेटर नोएडा म(cid:25) नया 765/400 सब(cid:9)ट ेशन 17 >ेटर नोएडा म(cid:25) नए 765/400केवी सब(cid:9)ट ेशन पर 2x500एमवीए 400/220केवी आईसीटी 18. रीवा रोड इलाहाबाद-बांदा 400केवी \व ैद डी/सी लाइन 19. बांदा-उरई 400केवी \ वैद डी/सी लाइन 20. उरई-मैनपुरी 765केवी यूपीपीपीसीएल 400केवी \व ैद डी/सी लाइन 21. 400/220 केवी 2x315 एमवीए के साथ बांदा म(cid:25) 400 केवी सब(cid:9)ट ेशन क (cid:9)थ ापना 22. 400/220केवी 2x315 एमवीए आईसीटी के साथ उरई म(cid:25) 400केवी सब(cid:9)ट ेशन क (cid:9)थ ापना 23. मेजा-इलाहाबाद (पीजी) 400केवी डी/सी लाइन 24. उ(न ाव-मैनपुरी 765केवी एस/सी लाइन 25. मैनपुरी-हापुड़ 765केवी एस/सी लाइन ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----ययययूपूपूपूपीीीी----00004444 लिलतपुर टीपीएस (3x660 1. लिलतपुर-भोगनीपुर –I 765केवी एस/सी लाइन (200'कमी) मेगावाट) 2. लिलतपुर-आगरा 765केवी एस/सी लाइन (470 'कमी) (रा3य ,े9) 3. आगरा (यूपी)- आगरा(पीजी) 765केवी एस/सी लाइन (50 (संभािवत) 'कमी) 4. लिलतपुर 765/220केवी सब(cid:9)ट ेशन (2x300) एमवीए 5. झांसी-लिलतपुर –लिलतपुर ि(cid:9)वचयाड (cid:14) 220केवी डी/सी लाइन (2x50 'कमी) ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएननननआआआआरररर----ययययूपूपूपूपीीीी----00005555 अनपरा डी (1000 मेगावाट) 1. अनपरा बी-अनपरा डी 400केवी डी/सी लाइन (रा3य ,े9) 2. अनपरा सी-अनपरा डी 765केवी एस/सी लाइन 3. अनपरा डी- उ(न ाव 765केवी एस/सी लाइन 4. अनपरा डी 765/400केवी सब(cid:9)ट ेशन (2x600+1000) एमवीए ------------------------------------------------------------------------------------------------696 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] अअअअननननबबुुबबुु धधंंधधंं ----7777....2222 पपपपििििDDDDममममीीीी (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ---- पपपपााााररररेेेेषषषषणणणण ययययोोोोजजजजननननाााा ििििववववववववररररणणणण पपपपििििDDDDममममीीीी (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ससससददुुददुु ढ़ढ़ढ़ढ़ृृृृ ीीीीककककररररणणणण ययययोोोोजजजजननननााााएएएए ंं ंं:::: ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----आआआआईईईईएएएएसससस----00001111 दादर नगर हवेली संघ रा3य ,े9 1. दादर नगर हवेली संघ रा3य ,े9 म(cid:25) (cid:19)(cid:9)त ािवत काला सब(cid:9)ट ेशन पर म(cid:25) 400/220केवी सब(cid:9)ट ेशन क वापी –नवी मु€ब ई 400 केवी डी/सी के दोन% सgकट का एलआईएलओ (cid:9)थ ापना 2. दादर नगर हवेली संघ रा3य ,े9 (जीआईएस) म(cid:25) (cid:19)(cid:9)त ािवत काला सब(cid:9)ट ेशन पर 400/220केवी, 2x315 एमवीए सब(cid:9)ट ेशन क (cid:9)थ ापना ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----आआआआईईईईएएएएसससस----00002222 दमन संघ रा3य ,े9 म(cid:25) 400/220 1. मगरवाडा सब(cid:9)ट ेशन पर नवसारी-बोइसारी 400 केवी डी/सी केवी सब(cid:9)ट ेशन क (cid:9)थ ापना लाइन के दोन% सgकट का एलआईएलओ 2. मगरवाड़ा सब(cid:9)ट ेशन (जीआईएस) पर 400/220केवी, 2x315 एमवीए सब(cid:9)ट ेशन क (cid:9)थ ापना ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----आआआआईईईईएएएएसससस----00003333 रायपुर 400केवी सब(cid:9)ट ेशन पर अलग 1. 400 केवी रायपुर बस को बस से\श नलाइजर के ज(cid:27)रए चंFपुर-1 बस Šय व(cid:9)थ ा और पुन: सं)पण/सीमांत और चंFपुर-2 क मौजूदा लाइन बे के बीच दो भाग% म(cid:25) िवभािजत लाइन% क िशDJटग करना 2. रायपुर म(cid:25) बाइपास 400 केवी घाटापारा-रायपुर- िभलाई लाइन और 400 केवी भाटापारा-िभलाई एस/सी के )प म(cid:25) लाइन पुन: (cid:9)थ ािपत करना 3. रायपुर-बी और रायपुर-ए भाग से चंFपुर-2 और चंFपुर-3 लाइन बे क िशDJटग पपपपििििDDDDमममम ििििननननPPPPकक कक षषषषणण(cid:8)(cid:8)णण(cid:8)(cid:8) ययययोोोोजजजजननननााााएएएए ंं ंं:::: ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----जजजजीीीीजजजज--ेे--ेे 00001111 केएपीपी िव(cid:9)त ार यूिनट - 1. काकरापार एनपीपी-नवसारी400केवी डी/सी लाइन 3,4,(1400मेगावाट)(के(F ीय ,े9) 2. काकरापार एनपीपी-वापी 400केवी डी/सी लाइन ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----जजजजीीीीजजजज--ेे--ेे 00002222 मुंFा यूएमपीपी (4000मेगावाट) के 1. मुंFा-बqछ ाउ-रणछोड़पुरा 400 केवी ((cid:27)[पल (cid:9)न ोबड(cid:14)) डी/सी िलए पारेषण (cid:19)णाली (िनजी ,े9)- 2. मुंFा-जेतपुर 400 केवी ((cid:27)[पल (cid:9)न ोबड)(cid:14) डी/सी भाग-क 3. मुंFा-Dलबडी 400 केवी ((cid:27)[पल (cid:9)न ोबड)(cid:14) डी/सी ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----जजजजीीीीजजजज--ेे--ेे 00003333 मुंFा यूएमपीपी (4000मेगावाट) के 1. गंधार-नवसारी 400 केवी डी/सी िलए पारेषण (cid:19)णाली (िनजी ,े9)- 2. नवसारी-बोइसर 400 केवी डी/सी¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 697 भाग-ख (पिdमी ,े9 म(cid:25) सुदढ़ृ ीकरण) 3. वधा(cid:14)-औरंगाबाद 400 केवी (\व ैद) डी/सी (बाद म(cid:25) 1200 केवी (cid:9)त र तक अप>ेड करने के (cid:19)ावधान सिहत) 4. औरंगाबाद-औरंगाबाद (एमएसईटीसीएल) 400 केवी डी/सी \व ैद 5. नवसारी (पीजी) म(cid:25) कवास-नवसारी 220 केवी डी/सी के दोन% सgकट का एलआईएलओ 6. बqछ ाउ 400/220 केवी 2x315 एमवीए 7. नवसारी जीआईएस 400/220 केवी , 2x315 एमवीए 8. वधा(cid:14) 765/400 केवी , 3x1500 एमवीए 9. औरंगाबाद (पीजी) 400/220 केवी 2x315 एमवीए 10.िसवनी और वधा(cid:14) सब(cid:9)ट ेशन म(cid:25) 765 केवी िव(cid:9)त ार 11.Dलबडी सब(cid:9)ट ेशन म(cid:25) 400 केवी िव(cid:9)त ार 12.रणछोड़पुरा सब(cid:9)ट ेशन म(cid:25) 400 केवी िव(cid:9)त ार 13. वधा(cid:14) अंत म(cid:25) वधा(cid:14)-औरंगाबाद 400केवी डी/सी पर (cid:19)(cid:2)य के के िलए 40% िनधा(cid:14)(cid:27)रत सी(cid:27)रज ,ितपू*त ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----जजजजीीीीजजजज--ेे--ेे 00004444 िपपावव (1200 मेगावाट) 1. िपपावव टीपीएस- िपराना 400 केवी डी/सी लाइन((cid:27)[पल) के साथ (िनजी ,े9) िपपावव म(cid:25) 1X125 एमवीए बस (cid:27)रए\ट र 2. िपराना-डहे गाम 400 केवी डी/सी लाइन (िPतीय) 3. िपराना म(cid:25) 1X315 एमवीए , 400/220 केवी आईसीटी (तृतीय) क (cid:9)थ ापना ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----जजजजीीीीजजजज--ेे--ेे 00005555 धुवरन िव(cid:9)त ार (360 मेगावाट) 1. धुवरन म(cid:25) कासोर-वतWज 220 केवी एस/सी लाइन का एलआईएलओ (रा3य ,े9) 2. धुवरन म(cid:25) करमसाद-वतWज 220 केवी एस/सी लाइन का एलआईएलओ ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----जजजजीीीीजजजज--ेे--ेे 00006666 भावनगर (2X250 मेगावाट) 1. बीईसीएल-बोताड़ 220 केवी डी/सी लाइन (रा3य ,े9) 2. बीईसीएल- सागापारा 220 केवी डी/सी लाइन 3. बीईसीएल म(cid:25) सव(cid:14)कुंडला-वतWज 220 केवी लाइन का एलआईएलओ ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----जजजजीीीीजजजज--ेे--ेे 00007777 िस\क ा िव(cid:9)त ार 2X250मेगावाट) 1. एआई 59 कमान के साथ िस\क ा-मोती पनेली220 केवी डी/सी लाइन (रा3य ,े9) 2. सgकट िस\क ा म(cid:25) जामनगर-जेतपुर 220 केवी डी/सी लाइन के दोन% सgकट का एलआईएलओ698 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----जजजजीीीीजजजज--ेे--ेे 00008888 पीपावव सीसीपीपी(2x351 1. पीपावव टीपीएस- ढोकाडवा 220केवी डी/सी लाइन मेगावाट) जीएसईसीएल (रा3य 2. पीपावव (जीपीपीसी) म(cid:25) सवरकुंडला-महवा 220केवी दोन% लाइन% ,े9) का एलआईएलओ 3. म#आ-सागापारा 220केवी डी/सी लाइन ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----जजजजीीीीजजजज--ेे--ेे 00009999 सासन और मुंFा यूएमपीपी के साथ 1. आगरा-सीकर 400केवी डी/सी (\व ैद) लाइन उ(cid:2)त री ,े9 म(cid:25) (cid:19)णाली सुदढ़ृ ीकरण 2. सीकर-जयपुर (पावरि>ड) 400केवी डी/सी लाइन 3. सीकर-रतनगढ़ 400केवी डी/सी लाइन <+ 4. सीकर (पावरि>ड) पर सीकर (आरवीपीएनएल)-रतनग (आरवीपीएनएल) 220 केवी डी/सी लाइन के दोन% सgकट का एलआईएलओ 5. पंचकुला म(cid:25) नाथपाझाकरी-अNद @ु ल ापुर 400केवी डी/सी के दोन% सgकट का एलआईएलओ 6. सीकर म(cid:25) 2x315 एमवीए [ांसफामWशन ,मता के साथ नए 400/220केवी सब(cid:9)ट ेशन क (cid:9)थ ापना 7. पंचकुला म(cid:25) 2x315 एमवीए [ांसफामWशन ,मता के साथ नए 400/220केवी सब(cid:9)ट ेशन क (cid:9)थ ापना 8. सासाराम-फतेहपुर 765केवी एस/सी लाइन ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----जजजजीीीीजजजज--ेे--ेे 11110000 उकाई िव(cid:9)त ार (जीएसईसीएल) 1. कोसांबा डी/सी म(cid:25) 400 केवी आसोज-उकाई का एलआईएलओ 500 मेगावाट (रा3य ,े9) 2. उकाई-कोसांबा 400केवी डी/सी लाइन 3. कोसांबा-को*णया 400केवी डी/सी लाइन 4. कोसांबा-जगािडया 220केवी डी/सी लाइन ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----जजजजीीीीजजजज--ेे--ेे 11111111 वनाकबोरी टीपीएस 1. डहे गाम (पीजी) म(cid:25) 400 केवी वनाकबोरी– सोजा लाइन के एक सgकट (जीएसईसीएल) 500 मेगावाट का एलआईएलओ (रा3य ,े9) 2. सोजा-जेदा(cid:14) 400केवी डी/सी लाइन 3. वनाकबोरी ि(cid:9)वचयाड-(cid:14) वनागबोरी (मौजूदा) 400केवी डी/सी लाइन 4. वनाकबोरी- सोजा 400केवी डी/सी लाइन ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----जजजजीीीीजजजज--ेे--ेे 11112222 शपूरजी प@ल ोनजी एनज] िलिमटेड 1. एसपीईएल – िपराना 400केवी डी/सी लाइन (एसपीईएल) 2. एसपीइ(cid:14)एल - अमरेली 400केवी डी/सी लाइन (1320 मेगावाट)(िनजी ,े9)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 699 ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----जजजजीीीीजजजज--ेे--ेे 11113333 डीजीईएन टीपीएस -टोर(cid:25)ट पावर 1. डीजीईएनटीपीएस – नवसारी 400केवी डी/सी ((cid:27)[पल (cid:9) नोबड)(cid:14) िलिमटेड (1200 मेगावाट) (िनजी 2. डीजीईएन टीपीएस -वड़ोदरा 400 केवी डी/सी (िvवन मूज) ,े9) 3. नवसारी-भी(cid:9)त न 220 केवी डी/सी लाइन ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----जजजजीीीीजजजज--ेे--ेे 11114444 एनटीपीसी िलिमटेड (गंधार-II) मौजूदा गंधार 400केवी बस के साथ इंटरकने\श न (कनेि\टिवटी) (1300 मेगावाट)(के(F ीय ,े9) ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----जजजजीीीीजजजज--ेे--ेे 11115555 एनटीपीसी िलिमटेड (कवास-II) कवास-।। म(cid:25) 400केवी कोसाबं ा-वापी डी/सी का एलआईएलओ (1300 मेगावाट)(के(F ीय ,े9) (कनेि\टिवटी) ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----जजजजीीीीजजजज--ेे--ेे 11116666 गुजरात Jलरू ोकेिमक@स िलिमटेड जीएफएल डN@ य ूपीपी – बचाउ (पीजी) 220केवी डी/सी (िvवन जेबरा) (जीएफएल) (कनेि\टिवटी) (300 मेगावाट)(िनजी ,े9) ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----जजजजीीीीजजजज--ेे--ेे 11117777 Dसटे\स पावर िलिमटेड (1708 Dसटे\स -िपराना 400केवी (\व ैद) डी/सी लाइन मेगावाट) (कनेि\टिवटी) (िनजी ,े9) ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----एएएएममममपपपपीीीी----00001111 उ(cid:2)त री ,े9 का Dव(cid:24)य ाचल 1. (cid:27)रहदं -III- Dव(cid:24)य ाचल पूल 765 केवी डी/सी लाइन (शु)आत म(cid:25) 400 एसटीपीपी -IV (2X500 केवी पर (cid:19)चािलत करने के िलए) मेगावाट), 2. Dव(cid:24)य ाचल-IV - Dव(cid:24)य ाचल पूल 400 केवी डी/सी (\व ैद) (cid:27)रहदं एसटीपीपी-III (2X500 3. Dव(cid:24)य ाचल पूल-सतना 765 केवी 2xएस/सी मेगावाट) (के(F ीय ,े9) 4. सतना-Tव ािलयर 765 केवी 2x एस/सी 5. Tव ािलयर-जयपुर (दि,ण) 765 केवी एस/सी 6. Dव(cid:24)य ाचल पूल-सासन 765 केवी एस/सी 7. Dव(cid:24)य ाचल पूल पर 765/400केवी, 2x1500 एमवीए सब(cid:9)ट ेशन क (cid:9)थ ापना ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----एएएएममममपपपपीीीी----00002222 सासन यूएमपीपी (3960 1. 765 केवी सासन – सतना लाइन-I मेगावाट) के िलए पारेषण (cid:19)णाली 2. 765 केवी सासन – सतना लाइन-II700 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] भाग-क 3. 765 केवी सतना - बीना(पीजी) लाइन-I 4. 765 केवी सतना - बीना(पीजी) लाइन-II 5. 765 केवी सासाराम - फतेहपुर लाइन-II 6. 765 केवी फतेहपुर - आगरा लाइन 7. 400 केवी बीना (पीजी)-बीना(एमपीपीटीसीएल) लाइन 8. सासन म(cid:25) Dव(cid:24)य ाचल-जबलपुर 400 केवी डी/सी के दोन% सgकट का एलआईएलओ सासन यूएमपीपी (3960 1. बीना (पीजी)-इंदौर(पीजी) 765 केवी एस/सी मेगावाट) के िलए पिdमी ,े9 म(cid:25) 2. इंदौर(पीजी)-इंदौर (एमपीपीटीसीएल) 400 केवी डी/सी \व ैद भाग ख ,े9ीय (cid:19)णाली सुदढ़ृ ीकरण 3. इंदौर सब(cid:9)ट ेशन 765/400 केवी, 2x1500 एमवीए 4. Tव ािलयर म(cid:25) नए 765/400 केवी, 2x1500 एमवीए सब(cid:9)ट ेशन क (cid:9)थ ापना 5. बीना (पीजी) म(cid:25) 765/400 केवी, 2x1000 एमवीए सब(cid:9)ट ेशन का िव(cid:9)त ार 6. सतना म(cid:25) नए 765/400 केवी, 2x1000 एमवीए सब(cid:9)ट ेशन क (cid:9)थ ापना 7. आगरा, Tव ािलयर, बीना और िसवनी सब(cid:9)ट ेशन म(cid:25) 765 केवी ए\स ट(cid:25)शन 8. 765 केवी के (cid:9)त र पर िसवनी-बीना एस/सी लाइन के चा(cid:144)जग के िलए 765 केवी बे का (cid:19)ावधान ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----एएएएममममपपपपीीीी----00003333 बीना पावर (2x250 मेगावाट) 1 . ब ी ना टीपीएस से डी/सी टावर पर कॉमन Oव ाइंट तक 400केवी डी/सी (िनजी ,े9) लाइन 2. उपयु(cid:14)\त ् म(cid:25) से एक सgकट का बीना (पीजी) तथ ा दसू रे का बीना (एमपीटीसीएल) म(cid:25) समापन ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----एएएएममममपपपपीीीी----00004444 1 . ग ंध ा र - ह ि ज र ा 4 0 0 क े व ी ड ी / स ी ल ा इ न महान पावर (1200मेगावाट) 2. महान सब(cid:9)ट ेशन पर 400केवी Dव(cid:24)य ाचल-कोरबा लाइन का ( िनजी ,े9) एलआईएलओ 3. महान-िसपट 400केवी डी/सी लाइन 4. हिजरा सब(cid:9)ट ेशन 400/220केवी (2x500एमवीए) सब(cid:9)ट ेशन ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----एएएएममममपपपपीीीी----00005555 म(cid:24)य (cid:19)दशे म(cid:25) उ(cid:2) पादन प(cid:27)रयोजना के िलए सम*पत पारेषण (cid:19)णाली Dव(cid:24)य ाचल पूDलग Oव ाइंट से जुड़ा #आ ह।ै Dव(cid:24)य ाचल–V (500 मेगावाट) 1. Dव(cid:24)य ाचल (cid:9)ट ेशन-IV के साथ इंटरकने\श न (के(F ीय ,े9)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 701 आय(cid:14)न एमपी िव(cid:17)ुत उ(cid:2)प ादन 1. आय(cid:14)न कोला – Dव(cid:24)य ाचल पूDलग (cid:9)ट ेशन 400केवी डी/सी (उqच कंपनी िलिमटेड (1200 मेगावाट) ,मता) (िनजी ,े9) 2. Dव(cid:24)य ाचल पूDलग (cid:9)ट ेशन पर दो 400 केवी ब े डीबी पावर (एमपी) िलिमटेड 1. डीबी पावर – Dव(cid:24)य ाचल पूDलग (cid:9)ट ेशन 400केवी डी/सी (\व ैद) यू-1, 2 (1320 मेगावाट) लाइन 2. Dव(cid:24)य ाचल पूDलग (cid:9)ट ेशन पर दो 400 केवी ब े ( िनजी ,े9) िच9ांगी पावर (5940 मेगावाट) 1.िच9ांगी टीपीएस-Dव(cid:24)य ाचल पूDलग (cid:9)ट ेशन 765केवी के साथ (िनजी ,े9) 765केवी, 1x240एमवीएआर बस (cid:27)रए\ट र ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----एएएएममममपपपपीीीी----00006666 जय(cid:19)काश पावर व(cid:25)चस(cid:14) िलिमटेड- 1. जय(cid:19)काश-सतना 400केवी डी/सी (उqच ,मता) िनगरी टीपीपी (2x660 मेगावाट) 2. सतना (पावरि>ड) पर दो 400 केवी ब े (िनजी ,े9) ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----एएएएममममपपपपीीीी----00007777 म(cid:24)य (cid:19)दशे म(cid:25) उ(cid:2) पादन प(cid:27)रयोजना के िलए सम*पत पारेषण (cid:19)णाली जबलपुर पूDलग O वाइंट (मोजरिबअर पावर, टुड े एनज], झबुआ पावर) से जुड़ा #आ ह।ै मोजरिबअर पावर (अ(न ूपूर 1. एमबी पावर-जबलपुर पीएस400 केवी डी/सी लाइन ((cid:27)[पल) टीपीपी) (1200 मेगावाट) (िनजी ,े9) टुड े एनज] (1320 मेगावाट) (िनजी 1. टुड े एनज]- जबलपुर पीएस 400 केवी डी/सी लाइन(\व ैद) ,े9) झबुआ पावर 1. झबुआ पावर - जबलपुर पूDलग (cid:9)ट ेशन (उqच ,मता लाइन) एसजेके पावरजने िलिमटेड (1320 1. एसजेके टीपीएस – जबलपुर पूDलग (cid:9)ट ेशन 1x125एमवीएआर बस मेगावाट) (िनजी ,े9) (cid:27)रए\ट र के साथ 400केवी डी/सी (कनेि\टिवटी) ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----एएएएममममपपपपीीीी----00008888 मालवा (lी Dसहजी) टीपीपी 1. मालवा टीपीएच – पीतमपुर 400 केवी डी/सी लाइन (1200मेगावाट) (रा3य ,े9) 2. मालवा टीपीएच – जुलवािनया 400 केवी डी/सी लाइन (एक सgकट छेगांव से) 3. छेगांव-जुलवािनया 400 केवी डी/सी लाइन 4. मालवा टीपीएच - छेगांव 200 केवी डी/सी लाइन 5. िपतमपुर (400केवी)- िपतमपुर (220केवी) इंटर कन\े श न 6. जुलवािनया 400केवी सब(cid:9)ट ेशन पर 220केवी िनमरानी-जुलवािनया के दोन% सgकट का एलआईएलओ702 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----एएएएममममपपपपीीीी----00009999 सतपुरा ए\स ट(cid:25)शन टीपीपी यू-10,11 1. सतपुरा टीपीएच - आ(cid:9)थ ा 400 केवी डी/सी लाइन (500मेगावाट) 2. आ(cid:9)थ ा – इंदौर-II(जेतपुरा) डीसी पर 220केवी एस/सी (रा3य ,े9) 3. आ(cid:9)थ ा (य ू 400/220केवी सब(cid:9)ट ेशन (630एमवीए) 4. आ(cid:9)थ ा (अित(cid:27)र\त [ांसफामर(cid:14) ) 220/132केवी सब(cid:9)ट ेशन (160 एमवीए) ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----एएएएममममपपपपीीीी----11110000 ए(cid:9)स ार पावर एमपी िलिमटेड महान टीपीएस चरण-1 उ(cid:2)प ादन प(cid:27)रयोजना से 1x125 एमवीएआर (महान चरण II) (600 मेगावाट) बस (cid:27)रए\ट र सिहत (cid:19)(cid:9)त ािवत उ(cid:2)प ादन प(cid:27)रयोजना ि(cid:9)वचयाड (cid:14) तक (िनजी ,े9) बस िव(cid:9)त ार (कनेि\टिवटी) ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----एएएएममममएएएएचचचच----00001111 मौदा एसटीपीएस- I (2X500) 1. मौदा एसटीपीएस– वधा(cid:14) 400 केवी डी/सी (\व ैद) मेगावाट 2. 400/220 केवी वधा(cid:14) सब(cid:9)ट ेशन का िव(cid:9)त ार (के(F ीय ,े9) ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----एएएएममममएएएएचचचच----00002222 मौदा एसटीपीएस- II (2X660) 1. मौदा -II– बेतुल 400 केवी डी/सी (\व ैद) मेगावाट 2. बेतुल – खंडवा 400केवी डी/सी (\व ैद) (के(F ीय ,े9) 3. खंडवा – रायगढ़ 400केवी डी/सी (िPतीय) 4. बेतुल म(cid:25) 400/220 केवी ,2x315 एमवीए सब(cid:9)ट ेशन ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----एएएएममममएएएएचचचच----00003333 ितरोदा अदानी चरण-1,चरण –II 1. ितरोदा (ग%िडया) - वरोरा 400 केवी डी/सी लाइन (\व ैद) (1320मेगावाट+1320मेगावाट) 2. ितरोदा-कोराडी III 765 केवी 2xएस/सी लाइन (िनजी ,े9) 3. कोराडी-III - अकोला-II 765 केवी 2xएस/सी लाइन 4. अकोला-II - औरंगाबाद II 765 केवी 2xएस/सी लाइन 5. ितरोदा (ग%िडया) म(cid:25) 2x1500 एमवीए, 765/400 केवी आईसीटी 6. औरंगाबाद II-औरंगाबाद (पीजी) 765केवी एस/सी (डी/सी टावर के साथ) 7. 2x1500 एमवीए के साथ औरंगाबाद (II) 765/400 केवी सब(cid:9)ट ेशन ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----एएएएममममएएएएचचचच----00004444 इंिडया बु@स (cid:27)रयलटेक िलिमटेड 1. िस(न र – नािसक 400केवी डी/सी (नािसक) 2. िस(न र – बाबले(cid:29)व र 400केवी डी/सी लाइन चरण- 1& II (5x270 +2x270)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 703 मेगावाट (िनजी ,े9) ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----एएएएममममएएएएचचचच----00005555 इंिडया बु@स -अमरावती नंदगांवपेट 1. नंदगांवपेट-अकोला-I 400 केवी डी/सी लाइन (\व ैद) चरण- 1 और II (5x270 +2x270) 2. नंदगांवपेट म(cid:25) अकोला-।-कोराडी-। 400केवी एस/सी लाइन का मेगावाट एलआईएलओ (िनजी ,े9) ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----एएएएममममएएएएचचचच----00006666 आइ िडयल पावर (बेला टीपीप) मेसस(cid:14) आइिडयल एनज] म(cid:25) 400 केवी कोराडी-।।-वधा(cid:14) (पीजी) के एक (540मेगावाट) (िनजी ,े9) सgकट का एलआईएलओ ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----एएएएममममएएएएचचचच----00007777 धारीवाल इं(cid:127)ा(cid:9)[ \च र (600 1. धारीवाल-चंFपुर- II 400केवी डी/सी लाइन (यू -1 के िलए) मेगावाट) यू-1,2 2. धारीवाल टीपीएस (यू-2 के िलए) पर भFावती (पीजी)-पल] 400 (िनजी ,े9) केवी डी/सी लाइन के एक सgकट का एलआईएलओ ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----एएएएममममएएएएचचचच----00008888 एमको-वरोरा, महारा_[ (600 एमको-भFावती (पीजी) 400 केवी डी/सी लाइन मेगावाट) (िनजी ,े9) ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----एएएएममममएएएएचचचच----00009999 पल] ((cid:19)ित(cid:9)थापन) यू-8 1. पल]-नांदड़े 220केवी डी/सी लाइन (250मेगावाट) (रा3य ,े9) 2. पल] डी/सी लाइन पर 220केवी जीसीआर-बीड का एलआईएलओ ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----एएएएममममएएएएचचचच----11110000 कोराडी (1980 मेगावाट) 1. कोराडी-II – कोराडी–III 400 केवी \व ैद डी/सी लाइन (रा3य ,े9) 2. कोराडी -II म(cid:25) 7X167एमवीए,400/220 केवी सब(cid:9)ट ेशन ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----एएएएममममएएएएचचचच----11111111 चंFपुर II टीपीएस (1000मेगावाट) 1. चंFपुर-।। (जो 3 म(cid:25) से 2 सgकट% का एलआईएलओ ह)ै म(cid:25) चंFपुर-पल] (रा3य ,े9) 400केवी डी/सी के दोन% सgकट% का एलआईएलओ 2. चंFपुर-II – वरोरा – वधा(cid:14) पीजी 400केवी \व ैद डी/सी 3. चंFपुर-।। म(cid:25) 2x500 एमवीए, 400/220 केवी सब(cid:9)ट ेशन ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----एएएएममममएएएएचचचच----11112222 धोपावे (1600 मेगावाट) (रा3य 1. धोपावे – पडघे II 400केवी \व ैद डी/सी लाइन ,े9) 2. धोपावे म(cid:25) जयगढ़-(य ू कोयना 400केवी \व ैद डी/सी के दोन% सgकट% का एलआईएलओ ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----एएएएममममएएएएचचचच----11113333 यूरान सीसीसपीपी (1040मेगावाट) 1. एसीसीसी टीडN@ य ू 620 (cid:9)\ व ेयर िमिम कंड\ट स(cid:14) के साथ ् यूरान- िनजी ,े9 आOट ा 220केवी 2X डी/सी लाइन का उ(न यन704 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 2. यूरान-खारघर 220केवी डी/सी लाइन ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----एएएएममममएएएएचचचच----11114444 जीईपीएल (गुOत ा एनज] (cid:19)ाइवेट 1. जीईपीएल – एमआईडीसी 220केवी डी/सी लाइन िलिमटेड) टीपीपी यू -1 और 2 2. 1x80एमवीएआर (cid:27)रए\ट र के साथ जीईपीएल टीपीएस पर (2x60) मेगावाट भFावती-पल] 400केवी लाइन के एक सgकट का एलआईएलओ (िनजी ,े9) ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----एएएएममममएएएएचचचच----11115555 एनपीसीआईएल जैतपुर जैतपुर-को@ह ापुर 765 केवी डी/सी लाइन. (कनेि\टवटी) (3480मेगावाट) (के(F ीय ,े9) ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----एएएएममममएएएएचचचच----11116666 िजनभुिवश पावर जेन (cid:19)ाइवटे 400केवी वधा(cid:14)-पल] डी/सी लाइन के एक सgकट का एलआईएलओ िलिमटेड (600 मेगावाट) (कनेि\टवटी) िनजी ,े9 ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----एएएएममममएएएएचचचच----11117777 Dहद(cid:9)ु त ान इलेि\[िसटी जने कंपनी एचईजीसीएल-पुणे (जीआईएस) 400 केवी डी/सी लाइन िलिमटेड (एचईजीसीएल))(1137 (कनेि\टिवटी) मेगावाट) िनजी ,े9 ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----ससससीीीीजजजजीीीी----00001111 िसपत-I(1980मेगावाट) 9. िसपत-िसवनी 765केवी एस/सी लाइन-1 (के(F ीय ,े9) 10. िसपत-िसवनी 765केवी एस/सी लाइन-2 11. िसवनी-खांडवा 400 केवी डी/सी (\व ैद एएएसी) 12. िसपत 400 केवी डी/सी पर कोरबा एसटीपीएस-रायपुर के एक सgकट का एलआईएलओ 13. िसवनी 400 केवी डी/सी पर िभलाई-सतपुरा एस/सी लाइन का एलआईएलओ 14. नागडा-डहे गाम 400 केवी डी/सी 15. राजगढ़ 400 केवी 2Xडी/सी म(cid:25) एस.सरोवर-नागडा डी/सी के दोन% सgकट% का एलआईएलओ 16. िसवनी सब(cid:9)ट ेशन 765/400 केवी ( 7x500 एकल चरण यूिनट) 17. िसवनी 400/220 केवी 2x315 एमवीए सब(cid:9)ट ेशन¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 705 18. राजगढ़ 400/220 केवी 2x315 एमवीए सब(cid:9)ट ेशन ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----ससससीीीीजजजजीीीी----00002222 राजगढ़ कांOल े\स म(cid:25) को[ा के नजदीक उ(cid:2)प ादन प(cid:27)रयोजना के िलए सम*पत पारेषण (cid:19)णाली [आरकेएम पावरजेन िलिमटेड, एसकेएस इ(cid:9)प ात और पावर िलिमटेड, डीबी पावर िलिमटेड, अवंता भंडार टीपीपी, एथेना छ(cid:2)त ीसगढ़ पावर िलिमटेड (2x600मेगावाट)] आरकेएम पावरजेन िलिमटेड (उचपांडा आरकेएम पावरजेन-रायगढ़ पूDलग (cid:9)ट ेशन (को[ा के नजदीक) टीपीपी) (4x360मेगावाट) 400केवी डी/सी(\व ैद) एसकेएस इ(cid:9)प ात और पावर िलिमटेड एसकेएस इ(cid:9)प ात-रायगढ़ पूDलग (cid:9)ट ेशन (को[ा के नजदीक) 400केवी (4x300मेगावाट ) (दर(cid:14)मपुरा टीपीपी) डी/सी(\व ैद) डीबी पावर िलिमटेड (2x600 डीबी पावर-रायगढ़ पूDलग (cid:9)ट ेशन (को[ा के नजदीक) 400केवी डी/सी मेगावाट) (\व ैद) अवंथा भंडार (कोरबा पिdम टीपीपी) कोरबा पिdम – रायगढ़ पूDलग (cid:9)ट ेशन (को[ा के नजदीक) 400केवी (2x600मेगावाट) डी/सी लाइन एथेना छ(cid:2)त ीसगढ़ पावर िलिमटेड एथेना छ(cid:2)त ीसगढ़- रायगढ़ पूDलग (cid:9)ट ेशन (को[ा के नजदीक) 400केवी (2x600मेगावाट) (िनजी ,9े ) डी/सी(\व ैद) कॉसमॉस (cid:9)प ांज एडं पावर िलिमटेड 1x80एमवीएआर बस (cid:27)रए\ट र के साथ सीएसपीली टीपीएस-रायगढ़ (सीएसपीएल) (350 मेगावाट) पूDलग (cid:9)ट ेशन (को[ा के नजदीक) 400केवी डी/सी (कनेि\टिवटी) वीसा ि(cid:9)टल िलिमटेड (450 मेगावाट) 1x80एमवीएआर बस (cid:27)रए\ट र के साथ वीसा ि(cid:9)टल टीपीएस-रायगढ़ पूDलग (cid:9)ट ेशन (को[ा के नजदीक) 400केवी डी/सी (कनेि\टिवटी) ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----ससससीीीीजजजजीीीी----00003333 जीएमआर छ(cid:2)त ीसगढ़ एनज] (cid:19)ाइवेट िलिमटेड (रायपुर का€O ल े\स ) (2X685मेगावाट) के िलए सम*पत पारेषण (cid:19)णाली जीएमआर छ(cid:2)त ीसगढ़ एनज] (cid:19)ाइवेट जीएमआर छ(cid:2)त ीसगढ़- रायपरु पूDलग (cid:9)ट ेशन 400 केवी डी/सी लाइन िलिमटेड (\व ैद) ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----ससससीीीीजजजजीीीी----00004444 चंपा कांOल े\स म(cid:25) उ(cid:2)प ादन प(cid:27)रयोजना के िलए सम*पत पारेषण (cid:19)णाली [अकलतारा (केएसके महानदी), पावर िलिमटेड (2400मेगावाट), कना(cid:14)टक् पावर कापyरेशन िलिमटेड.(केपीसीएल) (1600मेगावाट), ल"को अमरकंटक पावर(1320मेगावाट), एम बी पावर (छ(cid:2)त ीसगढ़)(1320 मेगावाट)] अकलतारा (केएसके महानदी) पावर वधा(cid:14) पावर (केएसके महानदी)– चंपा पूDलग (cid:9)ट ेशन 400केवी िलिमटेड (4x600मेगावाट) 2xडी/सी (\व ैद) कना(cid:14)टक पावर कारपोरेशन िलिमटेड केपीसीएल-चंपा पूDलग (cid:9)ट ेशन 400 केवी डी/सी (केपीसीएल) 1600मेगावाट) ल"को अमरकंटक पावर (1320मेगावाट) ल"को - चंपा पूDलग (cid:9)ट ेशन 400केवी डी/सी (\व ैद)706 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] (यू- 3, 4) एम बी पावर (छ(cid:2)त ीसगढ़) िलिमटेड एम बी पावर - चंपा पूDलग (cid:9)ट ेशन 400केवी डी/सी (\व ैद) (2x660 मेगावाट) (कनेि\टिवटी) ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----ससससीीीीजजजजीीीी----00005555 पिdमी ,े9 पूDलग Oव ाइंट (िबलासपुर) म(cid:25) आय(cid:14)न कोल बेिन'फिसय(cid:27)रज िलिमटेड ; धी) पावरजेन और पीटीसी इंिडया, (cid:9)प े\[ म पावर, मा)ित ि\लन कोल एडं पावर िलिमटेड के िलए सम*पत पारेषण (cid:19)णाली आय(cid:14)न कोल बेिन'फिसयरीज (cid:19)ाइवेट 1. आय(cid:14)न कोल -पिdमी ,े9 पूDलग Oव ाइंट (िबलासपुर) 400केवी िलिमटेड (1200मेगावाट) डी/सी धी) पावरजेन एडं पीटीसी इंिडया 1. धी) पावरजेन- पिdमी ,े9 पूDलग Oव ाइंट (िबलासपुर) (450+600मेगावाट) 400केवी डी/सी(उqच ,मता) (िनजी ,े9) 2. पिdमी ,े9 पूDलग Oव ाइंट (िबलासपुर) पर दो 400 केवी ब े (cid:9)प े\[ म पावर (100मेगावाट) (िनजी 1. (cid:9)प े\[ म जेनरेशन का आय(cid:14)न कोल बेिन'फिसयरीज (cid:19)ाइवटे िलिमटेड के साथ इंटरकने\श न ,े9) मा)ित ि\लन कोल एडं पावर िलिमटेड 1. मा)ित ि\लन कोल- पिdमी ,े9 पूDलग Oव ाइंट (िबलासपुर) (300मेगावाट) (िनजी ,े9) 400केवी डी/सी ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----ससससीीीीजजजजीीीी----00006666 Dजदल पावर, टीआरएन एनज] िलिमटेड (600मेगावाट), सारदा एनज] एडं िमनर@स (एसईएमएल) (350 मेगावाट), जायसवाल (य ू ऊजा(cid:14) िलिमटेड (जेएनयूएल) (600मेगावाट) के िलए सम*पत पारेषण (cid:19)णाली रायगढ़ चरण-III(4x600मेगावाट) Dजदल पावर- रायगढ़ पूDलग (cid:9)ट ेशन (तमनार के नजदीक) 400केवी (Dजदल पावर िलिमटेड) 2xडी/सी (\व ैद) टीआरएन एनज] (2x300 मेगावाट) टीआरएन एनज]- रायगढ़ पूDलग (cid:9)ट ेशन (तमनार के नजदीक) 400केवी 2xडी/सी (\व ैद) सारदा एनज] एडं िमनर@स सारदा एनज]- रायगढ़ पूDलग (cid:9)ट ेशन (तमनार के नजदीक) 400केवी (एसईएमएल) डी/सी लाइन (350 मेगावाट) जायसवाल (य ू ऊजा(cid:14) िलिमटेड जेएनयूएल- रायगढ़ पूDलग (cid:9)ट ेशन (तमनार के नजदीक) 400केवी (जेएनयूएल) (600मेगावाट) डी/सी लाइन ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----ससससीीीीजजजजीीीी----00007777 बा@क ो िलिमटेड (600मेगावाट), वंदना िव(cid:17)ुत िलिमटेड (540 मेगावाट) के िलए समिपत(cid:14)त पारेषण (cid:19)णाली बा@क ो िलिमटेड (2x300मेगावाट) बा@क ो- धरमजयगढ़ पूDलग (cid:9)ट ेशन 400केवी डी/सी ((cid:27)[पल) (िनजी ,े9) वंदना िव(cid:17)ुत िलिमटेड. वंदना िव(cid:17)ुत-धम(cid:14)जयगढ़ पूDलग (cid:9)ट ेशन 400 केवी डी/सी लाइन (4x135मेगावाट) (िनजी ,9े )¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 707 ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----ससससीीीीजजजजीीीी----00008888 को[ा के नजदीक रायगढ़ काOं ल े\स , 1. रायगढ़ पूDलग (cid:9)ट ेशन (को[ा के नजदीक)- रायगढ़ पूDलग (cid:9)ट ेशन तमनार के नजदीक रायगढ़ कांOल े\स , 765 केवी डी/सी लाइन. छ(cid:2)त ीसगढ़ का चंपा कांOल े\स और 2. रायगढ़ पूDलग (cid:9)ट ेशन (को[ा के नजदीक)- रायगढ़ (मौजूदा) 400 रायपुर कांOल े\स म(cid:25) अवि(cid:9)थत उ(cid:2)प ादन प(cid:27)रयोजना(cid:31) के िलए संयु\त एटीएस- केवी डी/सी (आनेवाली तारीख म(cid:25) खुला रखा जाएगा). भाग क 3. रायगढ़ पूDलग (cid:9)ट ेशन - रायगढ़ (मौजूदा) 400 केवी डी/सी (आनेवाली तारीख म(cid:25) खुला रखा जाएगा) 4. 765/400केवी 4x1500एमवीए रायगढ़ पूDलग (cid:9)ट ेशन (को[ा के नजदीक) क (cid:9)थ ापना 5. 765/400केवी 1x1500 एमवीए रायगढ़ पूDलग (cid:9)ट ेशन क (cid:9)थ ापना ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----ससससीीीीजजजजीीीी----00009999 को[ा के नजदीक रायगढ़ काOं ल े\स , 1. चंपा पूDलग (cid:9)ट ेशन-रायपुर पूDलग (cid:9)ट ेशन 765 केवी डी/सी लाइन. तमनार के नजदीक रायगढ़ कांOल े\स , 2. रायगढ़ पूDलग (cid:9)ट ेशन (को[ा के नजदीक)- रायगढ़ पूDलग (cid:9)ट ेशन छ(cid:2)त ीसगढ़ का चंपा कांOल े\स और (तमनार के नजदीक) 765 केवी डी/सी लाइन. रायपुर कांOल े\स म(cid:25) अवि(cid:9)थत उ(cid:2)प ादन प(cid:27)रयोजना(cid:31) के िलए संयु\त एटीएस- 3. चंपा पूDलग (cid:9)ट ेशन- धरमजयगढ़/कोरबा 765केवी एस/सी लाइन. भाग ख 4. रायगढ़ पूDलग (cid:9)ट ेशन (को[ा के नजदीक)- चंपा पूDलग (cid:9)ट ेशन 765केवी एस/सी लाइन. 5. 765/400केवी 6x1500एमवीए चंपा पूDलग (cid:9)ट ेशन क (cid:9)थ ापना 6. 765/400केवी 3x1500एमवीए रायगढ़ पूDलग (cid:9)ट ेशन (तमनार के नजदीक) क (cid:9)थ ापना ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----ससससीीीीजजजजीीीी----11110000 को[ा के नजदीक रायगढ़ काOं ल े\स , रायपुर पूDलग (cid:9)ट ेशन – वधा(cid:14) 765केवी डी/सी लाइन तमनार के नजदीक रायगढ़ कांOल े\स , छ(cid:2)त ीसगढ़ का चंपा कांOल े\स और रायपुर कांOल े\स म(cid:25) अवि(cid:9)थत उ(cid:2)प ादन प(cid:27)रयोजना(cid:31) के िलए संयु\त एटीएस- भाग ग ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----ससससीीीीजजजजीीीी----11111111 को[ा के नजदीक रायगढ़ काOं ल े\स , 1. वधा(cid:14) – औरंगाबाद (पीजी) 765केवी डी/सी लाइन. तमनार के नजदीक रायगढ़ कांOल े\स , 2. औरंगाबाद (पीजी) – बोईसर / खारघर 400केवी डी/सी (\व ैद) छ(cid:2)त ीसगढ़ का चंपा कांOल े\स और लाइन रायपुर कांप ् ले\स म(cid:25) अवि(cid:9)थत उ(cid:2)प ादन प(cid:27)रयोजना(cid:31) के िलए संयु\त एटीएस- 3. बोईसर म(cid:25) 400/220केवी, 1x500 एमवीए [ांसफाम(cid:14)र के Pारा भाग घ [ांसफामWशन ,मता का िव(cid:9)त ार 4. 765/400केवी 2x1500एमवीए औरंगाबाद (पीजी) सब(cid:9)ट ेशन708 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] क (cid:9)थ ापना ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----ससससीीीीजजजजीीीी----11112222 को[ा के नजदीक रायगढ़ काOं ल े\स , 1. औरंगाबाद (पीजी) – पडघे(पीजी) 765केवी डी/सी लाइन तमनार के नजदीक रायगढ़ कांOल े\स , 2. पडघे(पीजी) – पडघे(एमएसईटीसीएल) 400केवी डी/सी छ(cid:2)त ीसगढ़ का चंपा कांOल े\स और (\व ैद) लाइन रायपुर कांOल े\स म(cid:25) अवि(cid:9)थत उ(cid:2)प ादन प(cid:27)रयोजना(cid:31) के िलए संयु\त एटीएस- 3. वडोदरा – असोज 400केवी डी/सी(\व ैद) लाइन भाग ड़ 4. 765/400केवी, 2x1500एमवीए पडघे (पीजी) सब(cid:9)ट ेशन [जीआईएस सब(cid:9)ट ेशन] क (cid:9)थ ापना ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----ससससीीीीजजजजीीीी----11113333 को[ा के नजदीक रायगढ़ काOं ल े\स , रायपुर पूDलग (cid:9)ट ेशन – वधा(cid:14) 765केवी िPतीय डी/सी लाइन तमनार के नजदीक रायगढ़ कांOल े\स , छ(cid:2)त ीसगढ़ का चंपा कांOल े\स और रायपुर कांOल े\स म(cid:25) अवि(cid:9)थत उ(cid:2)प ादन प(cid:27)रयोजना(cid:31) के िलए संयु\त एटीएस- भाग च ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----ससससीीीीजजजजीीीी----11114444 को[ा के नजदीक रायगढ़ काOं ल े\स , वधा(cid:14) – औरंगाबाद (पीजी) 765केवी िPतीयडी/सी लाइन तमनार के नजदीक रायगढ़ कांOल े\स , छ(cid:2)त ीसगढ़ का चंपा कांOल े\स और रायपुर कांOल ेक् स म(cid:25) अवि(cid:9)थत उ(cid:2)प ादन प(cid:27)रयोजना(cid:31) के िलए संयु\त एटीएस- भाग छ ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----ससससीीीीजजजजीीीी----11115555 को[ा के नजदीक रायगढ़ काOं ल े\स , 1. रायगढ़ पूDलग (cid:9)ट ेशन (को[ा के समीप) और मेटैिलक (cid:27)रटन(cid:14) के तमनार के नजदीक रायगढ़ कांOल े\स , साथ धुले (पीजी) के बीच म(cid:25) ए±600केवी, 4000मेगावाट छ(cid:2)त ीसगढ़ का चंपा कांOल े\स और एचवीडीसी बाइपोल रायपुर कांOल े\स म(cid:25) अवि(cid:9)थत उ(cid:2)प ादन 2. धुले(पीजी) – धुले(आईपीटीसी)* 400केवी 2xडी/सी उqच ,मता प(cid:27)रयोजना(cid:31) के िलए संयु\त एटीएस- भाग ज सुचालक 3. धुले (पीजी) – नािसक 400केवी डी/सी(\व ैद) 4. धुले(पीजी) – मालेगांव 400केवी डी/सी(\व ैद) 5. रायगढ़ पूDलग (cid:9)ट ेशन (को[ा के समीप) और 400 केवी एसी (cid:9)ट ेशन के साथ धुले (पीजी) म(cid:25) से (cid:19)(cid:2)य ेक पर, 4000मेगावाट, ±600केवी एचवीडीसी बाइपोल क (cid:9)थ ापना 6. धुले (पीजी) म(cid:25) 400/220केवी, 2x315एमवीए [ांसफाम(cid:14)र क¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 709 (cid:9)थ ापना ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----ससससीीीीजजजजीीीी----11116666 को[ा के नजदीक रायगढ़ काOं ल े\स , 1. चंपा पूDलग (cid:9)ट ेशन (पिdमी ,े9) और मेटैिलक (cid:27)रटन(cid:14) के साथ तमनार के नजदीक रायगढ़ कांOल े\स , ह(cid:27)रयाणा म(cid:25) अवि(cid:9)थत कु),9े (उ(cid:2)त री ,े9) के बीच म(cid:25) छ(cid:2)त ीसगढ़ का चंपा कांOल े\स और ए±800केवी, 6000मेगावाट एचवीडीसी बाइपोल (शु)आत म(cid:25) रायपुर कांOल े\स म(cid:25) अवि(cid:9)थत उ(cid:2)प ादन 3000 मेगावाट पर (cid:19)चािलत करन े के िलए) प(cid:27)रयोजना(cid:31) के िलए संयु\त एटीएस- 2. चंपा पूDलग (cid:9)ट ेशन और ह(cid:27)रयाणा म(cid:25) कु),े9 म(cid:25) से (cid:19)(cid:2)य ेक पर, भाग । 3000मेगावाट, ±800केवी एचवीडीसी बाइपोल ट*मनल क (cid:9)थ ापना िजसका उ(न यन कर 6000 मेगावाट करन े का (cid:19)ावधान ह ै 3. कु),े9(उ(cid:2)त री ,े9) - जालंधर 400केवी डी/सी(\व ैद) लाइन ( एक सgकट 400/220केवी नकोडर सब(cid:9)ट ेशन के Pारा). 4. कु),े9 म(cid:25) अNद @ु ल ापुर-सोनीपत 400केवी डी/सी((cid:27)[पल) का एलआईएलओ 5. कु),े9 म(cid:25) 400/220केवी, 2x500 एमवीए सब(cid:9)ट ेशन क (cid:9)थ ापना 6. चंपा पूDलग Oव ाइंट पर 400/132केवी, 2x200 एमवीए सब(cid:9)ट ेशन क (cid:9)थ ापना ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----ससससीीीीजजजजीीीी----11117777 म(cid:24)य (cid:19)दशे और छ(cid:2)त ीसगढ़ म(cid:25) उ(cid:2)प ादन 1. इंदौर-वडोदरा 765केवी एस/सी प(cid:27)रयोजना(cid:31) के िलए पिdमी ,े9 म(cid:25) 2. वडोदरा – िपराना 400केवी डी/सी(\व ैद) (cid:19)णाली सुदढ़ृ ीकरण (िबलासपुर पूDलग (cid:9)ट ेशन पर पूल 'कया जा रहा ह)ै 3. 765/400केवी 2x1500एमवीए वडोदरा सब(cid:9)ट ेशन क (cid:9)थ ापना ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----ससससीीीीजजजजीीीी----11118888 पिdमी ,े9 म(cid:25) उ(cid:2)प ादन प(cid:27)रयोजना(cid:31) 1. जबलपुर-भोपाल-इंदौर 765केवी डी/सी (\व ैद बरिसिमस) के िलए पारेषण (cid:19)णाली सुदढ़ृ ीकरण 2. औरंगाबाद – धुले- वडोदरा 765केवी डी/सी (\व ैद बरिसिमस) 3. भोपाल (पीजी) –भोपाल (एमपीटीसीएल) 400केवी डी/सी \व ैद लाइन 4. धुले (पीजी) – धुले(एमएसईटीसीएल) 400केवी डी/सी \व ैद लाइन ततततााााििििललललककककाााा सससस::ंं::ंं डडडडबबबब ् ् ् ् यय यय आआूूआआूू रररर----ससससीीीीजजजजीीीी----11119999 (cid:9)व ाि(cid:9)तक टीपीपी यू-1(25 मेगावाट) (cid:9)व ाि(cid:9)तक टीपीपी पर कोरबा-मोपाका 132 केवी लाइन का एलआईएलओ (िनजी ,े9) ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----ससससीीीीजजजजीीीी----22220000 रितजा टीपीपी ( 50 मेगावाट) रितजा-कसाइप@ल ी 132केवी डी/सी लाइन (िनजी ,े9)710 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----ससससीीीीजजजजीीीी----22221111 मारवा सीएसईबी ( 2x500 मेगावाट) 1. मारवा-रायपुर (रैता) 400 केवी डी/सी लाइन रा3य ,े9 2. मारवा म(cid:25) कोरबा (पिdम)- खेडामारा 400 केवी डी/सी लाइन के एक सgकट का एलआईएलओ 3. मारवा-बनारी 220केवी डीसीडीएस ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----ससससीीीीजजजजीीीी----22222222 कोरबा (पिdम) (cid:9)ट ेशन -III , य-ू 1. रायपुर डीसीडीएस (रैता) म(cid:25) 400 केवी कोरबा (पिdम)- 5(500मेगावाट) खेडमे ारा(िभलाई) का एलआईएलओ 2. कोरबा (पिdम)-खेडमे ारा डीसीडीएस 400 केवी (रैता) लाइन (रा3य ,े9) 3. रायपुर (रैता) 400/220केवी सब(cid:9)ट ेशन (2x315 एमवीए) ततततााााििििललललककककाााा सससस::ंं::ंं डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय आआूूआआूू रररर----ससससीीीीजजजजीीीी----22223333 पिdमी ,े9 और उ(cid:2)त री ,े9 के िलए 1. जबलपुर-बीना 765केवी एस/सी लाइन साझा पिdमी ,े9 म(cid:25) (cid:19)णाली 2. जबलपुर-धरमजयगढ़ 765केवी डी/सी सुदढ़ृ ीकरण ------------------------------------------------------------------------------------------------ अअअअननननबबुुबबुु धधंंधधंं ----7777....3333 ददददिििि(cid:15)(cid:15)(cid:15)(cid:15)णणणणीीीी (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ---- पपपपााााररररेेेेषषषषणणणण ययययोोोोजजजजननननाााा ििििववववववववररररणणणण दि,णी ,े9- (cid:19)णाली सुदढ़ृ ीकरण योजनाए ं : ततततााााििििललललककककाााा सससस::ंं::ंं एएएएससससआआआआरररर----आआआआईईईईएएएएसससस----00001111 दि,णी ,े9 म(cid:25) (cid:19)णाली 1. येलाहांका म(cid:25) एमवीए [ांसफाम(cid:14)र और 1x63 एमवीएआर बस (cid:27)रए\ट र के सुदढ़ृ ीकरण-XII साथ नए 400/220 केवी सब(cid:9)ट ेशन क (cid:9)थ ापना 2. येलाहांका 400केवी सब(cid:9)ट ेशन पर नीलमंगला-Mडी 400केवी एस/सी लाइन का एलआईएलओ 3. येलाहांका 400केवी सब(cid:9)ट ेशन पर सोमनह@ल ी-Mडी 400केवी एस/सी लाइन का एलआईएलओ ततततााााििििललललककककाााा सससस::ंं::ंं एएएएससससआआआआरररर----आआआआईईईईएएएएसससस----00002222 दि,णी ,े9 म(cid:25) (cid:19)णाली 1. मधुिगरी म(cid:25) 400/220केवी सब(cid:9)ट ेशन, इस सब(cid:9)ट ेशन को उ(न ियत कर सुदढ़ृ ीकरण-XIII 765केवी (cid:9)त र तक प#चं ाने का (cid:19)ावधान ह।ै¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 711 2. गू(cid:27)ट-मधुिगरी 400केवी डी/सी लाइन 3. मधुिगरी-येलाहांका 400केवी डी/सी \व ैद लाइन ततततााााििििललललककककाााा सससस::ंं::ंं एएएएससससआआआआरररर----आआआआईईईईएएएएसससस----00003333 दि,णी ,े9 म(cid:25) (cid:19)णाली 1. सलेम (नया) – सोमनह@ल ी 400केवी \व ैद डी/सी लाइन. सुदढ़ृ ीकरण-XIV 2. होसर 400/230 केवी सब(cid:9)ट ेशन पर 1x315 एमवीए 400/220केवी [ांसफाम(cid:14)र िव(cid:9)त ार ततततााााििििललललककककाााा सससस::ंं::ंं एएएएससससआआआआरररर----आआआआईईईईएएएएसससस----00004444 दि,णी ,े9 म(cid:25) (cid:19)णाली 1. नाथ(cid:14) ि9सूर-कोिझकोड 400केवी \व ैद डी/सी लाइन सुदढ़ृ ीकरण-XV ततततााााििििललललककककाााा सससस::ंं::ंं एएएएससससआआआआरररर----आआआआईईईईएएएएसससस----00005555 दि,णी ,े9 म(cid:25) (cid:19)णाली 1. होसर-इले\[ ािनक िसटी 400 केवी डी/सी लाइन सुदढ़ृ ीकरण-XVI (इस लाइन का िनमा(cid:14)ण मौजूदा पी(य ा-Dसगारापेट 220केवी लाइन (वत(cid:14)मान म(cid:25) येरांडाह@ल ी-होसरु लाइन) के मागा(cid:14)िधकार का (cid:19)योग करते #ए 'कया जा सकता ह।ै इस मागा(cid:14)िधकार का (cid:19)योग ब# सgकट टावर का िनमा(cid:14)ण करके और/अथवा संबंिधत लाभा*थय% के साथ चचा(cid:14) के प(cid:29)च ात Šय वहा(cid:27)रक आधार पर लाइन के भाग को अलग करके 'कया जा सकता है)। 2. 400/220 केवी होसर (पीजी) तथा इले\[ ािनक िसटी (केपीटीसीएल) सब(cid:9)ट ेशन% पर बे िवस्त ार ततततााााििििललललककककाााा सससस::ंं::ंं एएएएससससआआआआरररर----आआआआईईईईएएएएसससस----00006666 दि,णी ,े9 म(cid:25) (cid:19)णाली 1. नरे(F (जीआईएस) तथा को@ह ापुर (जीआईएस) म(cid:25) से (cid:19)(cid:2)य ेक पर नया 400 सुदढ़ृ ीकरण-XVII केवी सब(cid:9)ट ेशन (जो बाद म(cid:25) 765 केवी तक उ(न ियत कर 'दया जाएगा) 2. नरे(F (जीआईएस)-को@ह ापुर (जीआईएस) 765केवी डी/सी लाइन (शु)आत म(cid:25) 400केवी पर (cid:19)भा(cid:27)रत 'कए जाने हते )ु -करीब 200 'कमी; 3. को@ह ापुर (जीआईएस) म(cid:25) मौजूदा को@ह ापुर-मापुसा 400केवी डी/सी लाइन के दोन% सgकट% का एलआईएलओ करीब 50 'कमी; 4. नरे(F (जीआईएस)- नरे(F (मौजूदा) 400केवी डी/सी \व ैद लाइन – करीब 20 'कमी. ततततााााििििललललककककाााा सससस::ंं::ंं एएएएससससआआआआरररर----आआआआईईईईएएएएसससस----00007777 दि,णी ,े9 म(cid:25) (cid:19)णाली 1. (cid:19)(cid:2)य ेक सgकट के दोन% िसर% पर एमवीएआर लाइन (cid:27)रए\ट र% के साथ सुदढ़ृ ीकरण-XVIII िवजयवाड़़ा – ने@ल ोर (आंn (cid:19)दशे ) 400 केवी डी/सी लाइन712 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ( - िवजयवाड़ा ने@ल ोर- - ित)वलम 2. (cid:19)(cid:2)य ेक सgकट के दोन% िसर% पर 1x50एमवीएआर लाइन (cid:27)रए\ट र% के साथ शोDलगन@ल ूर ) ने@ल ोर – िथ)वलम 400 केवी डी/सी \व ैद लाइन का(cid:27)रडोर 3. िथ)वलम- मेलाकोuयूर 400 केवी डी/सी लाइन 4. होसर म(cid:25) मौजूदा ब"गलोर-सलेम 400 केवी एस/सी लाइन का एलआईएलओ ततततााााििििललललककककाााा सससस::ंं::ंं एएएएससससआआआआरररर----आआआआईईईईएएएएसससस----00008888 दि,णी ,े9 म(cid:25) (cid:19)णाली 1. (cid:19)(cid:2)य ेक सgकट के दोन% िसर% पर 1x240 एमवीएआर लाइन (cid:27)रए\ट र% के -XIX ( सुदढ़ृ ीकरण कुनु(cid:14)ल- साथ कुनु(cid:14)ल – िथ)वलम 765 केवी डी/सी लाइन ) िथ)वलम का(cid:27)रडोर 2. िथ)वलम म(cid:25) 2x1500 एमवीए, 765/400केवी [ांसफाम(cid:14)र का (cid:19)ावधान 3. िथ)वलम म(cid:25) कोलार-lीपेरंबुदरू 400 केवी एस/सी लाइन का एलआईएलओ ततततााााििििललललककककाााा सससस::ंं::ंं एएएएससससआआआआरररर----आआआआईईईईएएएएसससस----00009999 दि,णी ,े9 म(cid:25) एचवीडीसी 1. एक नए पुगलुर एचवीडीसी ट*मनल(2500 मेगावाट) सब(cid:9)ट ेशन क बाइपोल सुदढ़ृ ीकरण (cid:9)थ ापना िजस े 400 केवी सब(cid:9)ट ेशन तथा बाद म(cid:25) उ(न ियत कर 765 केवी करने का (cid:19)ावधान ह।ै 2. हदै राबाद (पीजी) म(cid:25) एचवीडीसी ट*मनल (2500 मेगावाट) 3. + 500केवी, 2500 मेगावाट का (य ू पुगलुर-हदै राबाद एचवीडीसी बाइपोल 4. (य ू पुगलुर – उडुमालपेट 400केवी \व ैद डी/सी लाइन 5. (य ू पुगलुर – पुगलुर 400केवी \व ैद डी/सी लाइन 6. (य ू पुगलुर एचवीडीसी – तूितको(cid:27)रन पूDलग (cid:9)ट ेशन 400केवी \व ैद डी/सी लाइन 7. (य ू हदै राबाद एचवीडीसी – हदै राबाद (765/400केवी पीजी सब(cid:9)ट ेशन ) 400केवी \व ैद 2xडी/सी लाइन 8. (य ू हदै राबाद एचवीडीसी – कुनु(cid:14)ल (765/400केवी पीजी सब(cid:9)ट ेशन ) 400केवी \व ैद डी/सी लाइन ततततााााििििललललककककाााा सससस::ंं::ंं एएएएससससआआआआरररर----आआआआईईईईएएएएसससस----11110000 पूव] ,े9 से िव(cid:17)ुत आयात 1. lीकाकुलम पीपी- वेमािगरी –II पूDलग (cid:9)ट ेशन 765केवी डी/सी लाइन के िलए दि,णी ,े9 म(cid:25) 2. ख€म म ((य ू)- नागाजु(cid:14)न सागर 400केवी डी/सी लाइन (cid:19)णाली सुदढ़ृ ीकरण¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 713 दि,णी ,े9 – िन_क ष(cid:14)ण योजनाए ं :::: ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएससससआआआआरररर----एएएएपपपपीीीी----00001111 कृ_ण पuणम एलटीओए िव(cid:17)ुत प(cid:27)रयोजना [िस€ह ापुरी(600मेगावाट), मीना,ी (1000मेगावाट), कृ_ण पuणम पावर (नवयुग)(1320मेगावाट), काइनेटा पावर (1980मेगावाट), थम(cid:14)ल पावरटेक(1980मेगावाट), एनसीसी पावर (1320 मेगावाट), वीएसएफ प(cid:27)रयोजना (350 मेगावाट)] के िलए सम*पत पारेषण (cid:19)णाली िस€ह ापुरी(600मेगावाट)/ संब- बे सिहत Dसहापुरी /मीना,ी–ने@ल ोर 400 केवी डी/सी (\व ैद) लाइन मीना,ी I और II(300+700 मेगावाट) थम(cid:14)ल पावरटेक (पैणमपुरम) संब- बे सिहत थम(cid:14)ल पावरटेक उ(cid:2)प ादन ि(cid:9)वचयाड-(cid:14) ने@ल ोर पूDलग (cid:9)ट ेशन 765 केवी 2xएस/सी लाइन टीपीपी (3x660मेगावाट) कृ_ण पuणम (नवयुग) (1320 संब- बे सिहत कृ_ण पuणम पावर (नवयुग) उ(cid:2)प ादन ि(cid:9)वचयाड-(cid:14) ने@ल ोर पूDलग (cid:9)ट ेशन 765 केवी 2xएस/सी लाइन मेगावाट) काइनेटा पावर (1980 संब- बे सिहत काइनेटा पावर उ(cid:2)प ादन ि(cid:9)वचयाड-(cid:14) ने@ल ोर पूDलग (cid:9)ट ेशन 765 केवी 2xएस/सी लाइन मेगावाट) एनसीसी पावर (1320 एनसीसी उ(cid:2)प ादन ि(cid:9)वचयाड-(cid:14) ने@ल ोर पूDलग (cid:9)ट ेशन 400 केवी डी/सी (\व ैद) मेगावाट) लाइन वीएसएफ (cid:19)ोजे\ट िलिमटेड उ(cid:2)प ादन ि(cid:9)वचयाड-(cid:14) ने@ल ोर पूDलग Oव ाइंट 400 केवी डी/सी लाइन (350 मेगावाट) ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएससससआआआआरररर----एएएएपपपपीीीी----00002222 कृ_ण पuणम एलटीओए िव(cid:17)ुत 1. 2X1500एमवीए [ांसफाम(cid:14)र ,मता के साथ 765/400 केवी प(cid:27)रयोजना [िस€ह ापुरी(570मेगावाट), ने@ल ोर पूDलग (cid:9)ट ेशन क (cid:9)थ ापना मीना,ी (900मेगावाट), कृ_ण पuणम 2 ने@ल ोर पूDलग (cid:9)ट ेशन पर िस€ह ापुरी-ने@लोर 400 केवी डी/सी पावर (नवयुग)(1320मेगावाट), \व ैद लाइन का एलआईएलओ काइनेटा पावर (1980मेगावाट), थम(cid:14)ल 3. ने@ल ोर पूDलग (cid:9)ट ेशन – कुनु(cid:14)ल 765 केवी डी/सी लाइन. पावरटेक(1980मेगावाट), एनसीसी 4. कुनु(cid:14)ल – रायचरू िPतीय 765 केवी एस/सी लाइन ((cid:19)थम लाइन पावर (1320 मेगावाट) ] के िलए कृ_ण पuणम यूएमपीपी के तहत). साझा पारेषण (cid:19)णाली ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएससससआआआआरररर----एएएएपपपपीीीी----00003333 कृ_ण पuणम- भाग क और भाग-क भाग ग के साथ संब- पारेषण 1. टीपीसीआईएल – ने@ल ोर पूDलग Oव ाइंट (आरंभ म(cid:25) कृ_ण पuणम यूएमपीपी- (cid:19)णाली (कृ_ण पuणम ने@ल ोर के जैसा) 400 केवी\ वैद डी/सी लाइन यूएमपीपी के साथ संबंध िवqछ ेद, (cid:19)णाली सुदढ़ृ ीकरण 2. दोन% सgकट के (cid:19)(cid:2)य ेक िसर% पर 63एमवीएआर लाइन (cid:27)रए\ट र के साथ योजना के )प म(cid:25) काया(cid:14)(व यन ने@ल ोर पूDलग Oव ाइंट – गू(cid:27)ट (आरंभ म(cid:25) कृ_ण पuणम यूएमपीपी- गू(cid:27)ट के714 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 'कया जा रहा ह)ै जैसा) 400 केवी \व ैद डी/सी लाइन भाग-ग 1. कुनु(cid:14)ल म(cid:25) 2x 1500 एमवीए आईसीटी और 1x 240 एमवीएआर बस (cid:27)रए\ट र के साथ नए 765/400 केवी सब(cid:9)ट ेशन क (cid:9)थ ापना 2. कुनु(cid:14)ल ((य )ू सब(cid:9)ट ेशन पर नागाजनु(cid:14) सागर-गूटी 400 केवी एस/सी लाइन का एलआईएलओ 3. कुनु(cid:14)ल ((य )ू -कुनु(cid:14)ल (एपी[ांसको) 400 केवी डी/सी \व ैद लाइन 4. दोन% सgकट के (cid:19)(cid:2)य ेक िसर% पर 50 एमवीएआर लाइन (cid:27)रए\ट र के साथ कृ_ण पuणम यूएमपीपी-कुनलु(cid:14) ((य )ू 400केवी, \व ैद डी/सी लाइन (पृथक) 5. कुनु(cid:14)ल((य )ू – रायचूर 765केवी एस/सी लाइन (पृथक) ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएससससआआआआरररर----एएएएपपपपीीीी----00004444 कृ_ण पuणम- भाग ख के साथ भाग-ख संब- पारेषण (cid:19)णाली 1. (cid:19)(cid:2)य के सब(cid:9)ट ेशन पर 2x 1500 एमवीए आईसीटी और 1x 240 (कृ_ण पuणम यूएमपीपी के साथ संबंध िवqछ ेद, (cid:19)णाली एमवीएआर बस (cid:27)रए\ट र के साथ रायचूर और शोलापुर म(cid:25) नए 765/400 केवी सुदढ़ृ ीकरण योजना के )प म (cid:25) सब(cid:9)ट ेशन क (cid:9)थ ापना काया(cid:14)(व यन 'कया जा रहा ह)ै 2. पुणे म(cid:25) 2x1500 एमवीए [ांसफामWशन ,मता वाले नए 765/400 केवी सब(cid:9)ट ेशन (जीआईएस) क (cid:9)थ ापना 3. रायचुर ((य )ू सब(cid:9)ट ेशन पर मौजूदा रायचुर-गूटी 400केवी \व ैद डी/सी लाइन का एलआईएलओ 4. (cid:19)(cid:2)य ेक िसर% पर 240 एमवीएआर ि(cid:9)वचेबल लाइन (cid:27)रए\ट र के साथ रायचुर-शोलापुर 765 केवी एस/सी 5. (cid:19)(cid:2)य ेक िसर% पर 240 एमवीएआर ि(cid:9)वचेबल लाइन (cid:27)रए\ट र के साथ शोलापुर-पुणे 765 केवी एस/सी 6. पुणे (जीआईएस) म(cid:25) 50 एमवीएआर लाइन (cid:27)रए\ट र के साथ पुणे (जीआईएस) म(cid:25) औरंगाबाद-पुणे 400 केवी डी/सी का एलआईएलओ 7. पुणे (जीआईएस) म(cid:25) 50 एमवीएआर लाइन (cid:27)रए\ट र के साथ पुणे (जीआईएस) म(cid:25) पल]-पुणे 400 केवी डी/सी का एलआईएलओ ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएससससआआआआरररर----एएएएपपपपीीीी----00005555 पपपपूवूवूवूव0000 ततततटटटटीीीीयययय ऊऊऊऊजजजजाााा (cid:8)(cid:8) (cid:8)(cid:8)((((1111333322220000ममममेगेगेगेगााााववववााााटटटट)))) ((((ििििननननजजजजीीीी (cid:17)(cid:17)(cid:17)(cid:17)(cid:18)(cid:18)ेे(cid:18)(cid:18)ेे )))) ककककेेेे ििििललललएएएए ससससमममम(cid:23)(cid:23)(cid:23)(cid:23)पपपपतततत (cid:25)(cid:25)(cid:25)(cid:25)णणणणााााललललीीीी पूव] तटीय ऊजा(cid:14)-भावनापाडु 1. उ(cid:2)प ादन 400केवी पर आगे बढ़ाया जाएगा। टीपीपी(1320 मेगावाट) 2. उ(cid:2)प ादन ि(cid:9)वचयाड (cid:14) पर 1x125एमवीएआर का बस (cid:27)रए\ट र¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 715 3. पूव] तटीय ऊजा(cid:14) उ(cid:2)प ादन ि(cid:9)वचयाड–(cid:14) संब- वे सिहत lीकाकुलम पूDलग (cid:9)ट ेशन 400केवी डी/सी \व ैद लाइन ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएससससआआआआरररर----एएएएपपपपीीीी----00006666 lीकाकुलम ,े9[पूव] तटीय 1. 2x1500 एमवीए 765/400केवी [ांसफाम(cid:14)र ,मता के साथ ऊजा(cid:14) (cid:19)ाइवेट िलिमटेड lीकाकुलम ,े9 म(cid:25) 765/400केवी पूDलग (cid:9)ट ेशन क (cid:9)थ ापना प(cid:27)रयोजना (1320 मेगावाट)] म(cid:25) साझा पारेषण (cid:19)णाली 2. lीकाकुलम पूDलग (cid:9)ट ेशन – अंगुल 765 केवी डी/सी लाइन(आरंभ म(cid:25) एलटीओए प(cid:27)रयोजना 400केवी पर (cid:19)भा(cid:27)रत) 3. अंगुल म(cid:25) 765/400केवी 1x1500 एमवीए [ांसफाम(cid:14)र 4. अंगुल-झारसुगुडा 765 केवी डी/सी लाइन 5. झारसुगुडा-धम(cid:14)जयगढ़ 765 केवी डी/सी लाइन 6. lीकाकुलम पूDलग (cid:9)ट ेशन, अंगुल, झारसुगुडा और धम(cid:14)जयगढ़ 765/400केवी सब(cid:9)ट ेशन% पर संब- 400केवी और 765 केवी बे ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएससससआआआआरररर----एएएएपपपपीीीी----00007777 वेमािगरी ,े9 [( (cid:9)प े\[ म पावर(1400 मेगावाट), (cid:27)रलायंस(2400 मेगावाट), जीवीके गौतमी पावर िलिमटेड (800 मेगावाट), जीवीके पावर (जेगु)पाडु) (cid:19)ाइवेट िलिमटेड (800 मेगावाट),जीएमआर एनज]), आरवीके एनज](360 मेगावाट)] म(cid:25) आईपीपी प(cid:27)रयोजना के िलए सम*पत पारेषण (cid:19)णाली जीएमआर एनज] (768 1. उ(cid:2)प ादन 400 केवी पर आगे बढ़ाया जाएगा। उ(cid:2)प ादन प(cid:27)रयोजना मेगावाट) ि(cid:9)वचयाड (cid:14) पर 1x80 एमवीएआर का बस (cid:27)रए\ट र उपलNध कराया (िनजी ,े9) जाएगा । 2. जीएमआर एनज] ि(cid:9)वचयाड-(cid:14) वेमािगरी–II पूDलग (cid:9)ट ेशन 400 केवी डी/सी (\व ैद) लाइन (cid:9)प े\[ म पावर(1400 मेगावाट) 1. वेमािगरी-II पूDलग (cid:9) टेशन को 400 केवी \व ैद डी/सी लाइन (िनजी ,े9) 2. उ(cid:2)प ादन ि(cid:9)वचयाड (cid:14) पर 125 एमवीएआर बस (cid:27)रए\ट र (cid:27)रलायंस इ((cid:127) ा(cid:9)[ \च र िलिमटेड 1. वेमािगरी-II पूDलग (cid:9)ट ेशन को 400 केवी \व ैद 2xडी/सी लाइन (2400 मेगावाट) 2. उ(cid:2)प ादन ि(cid:9)वचयाड (cid:14) पर 2x125 एमवीएआर बस (cid:27)रए\ट र (िनजी ,े9) जीवीके गौतमी पावर िलिमटेड 1. मौजूदा ि(cid:9)वचयाड (cid:14) का बस ए\स ट(cid:25)शन (800 मेगावाट) 2. वेमािगरी-II पूDलग (cid:9)ट ेशन को 400 केवी डी/सी लाइन 3. उ(cid:2)प ादन ि(cid:9)वचयाड (cid:14) पर 80 एमवीएआर बस (cid:27)रए\ट र716 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] जीवीके पावर (जेगु)पाडु) 1. (य ू ि(cid:9)वचयाड (cid:14) पर मौजूदा 400केवी डी/सी लाइन म(cid:25) से एक का (cid:19)ाइवेट िलिमटेड (800 एलआईएलओ या मौजूदा ि(cid:9)वचयाड (cid:14) का बस िव(cid:9)त ार 2. वेमािगरी-II पूDलग (cid:9)ट ेशन का 400 केवी डी/सी लाइन मेगावाट) 3. उ(cid:2)प ादन ि(cid:9)वचयाड (cid:14) पर 80 एमवीएआर बस (cid:27)रए\ट र आरवीके एनज] (राजमुंFी) 1. आरवीके एनज] ि(cid:9)वचयाड-(cid:14) वेमािगरी –II पूDलग (cid:9)ट ेशन 400 केवी (cid:19)ाइवेट िलिमटेड (360मेगावाट) डी/सी लाइन ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएससससआआआआरररर----एएएएपपपपीीीी----00008888 वेमािगरी ,े9 [( (cid:9)प े\[ म 1. शाट(cid:14) सgकट एमवीए को कं[ोल करने के िलए भाग Šय व(cid:9)थ ा सिहत पावर(1400 मेगावाट), 4x1500 एमवीए [ांसफाम(cid:14)र के साथ वेमािगरी म(cid:25) 765/400केवी (cid:27)रलायंस(2400 मेगावाट), जीआईएस पूDलग (cid:9)ट ेशन क (cid:9)थ ापना जीवीके गौतमी पावर िलिमटेड 2. एसआर ि>ड के साथ आरंिभक एक करण के िलए वेमािगरी पूDलग (800 मेगावाट), जीवीके पावर (cid:9)ट ेशन पर गाजुवाका-िवजयवाड़ा 400केवी एस/सी लाइन का (जेगु)पाडु) (cid:19)ाइवेट िलिमटेड एलआईएलओ िजसे बाद म(cid:25) बाइपास 'कया जाएगा। 3. ख€म म सब(cid:9)ट ेशन का 400केवी आपरेशन और 2x1500 एमवीए (cid:19)ित (800 मेगावाट),जीएमआर [ांसफाम(cid:14)र के साथ ख€म म म (cid:25) 765/400 केवी पूDलग (cid:9)ट ेशन क एनज])], म(cid:25) आईपीपी (cid:9)थ ापना प(cid:27)रयोजना के िलए साझा पारेषण (cid:19)णाली 4. हदै राबाद 765/400 केवी सब(cid:9)ट ेशन – हदै राबाद (मौजूदा) 400 केवी डी/सी (\व ैद) लाइन 5. ख€म म 765/400 केवी सब(cid:9)ट ेशन – ख€म म (मौजूदा) 400 केवी डी/सी (\व ैद) लाइन 6. वेमािगरी पूDलग (cid:9)ट ेशन – ख€म म 765केवी 2xडी/सी लाइन( आरंभ म(cid:25) 400केवी पर (cid:19)भा(cid:27)रत) 7. ख€म म – हदै राबाद 765 केवी 2xडी/सी लाइन(आरंभ म(cid:25) 400केवी पर (cid:19)भा(cid:27)रत) 8. हदै राबाद – वधा(cid:14) 765 केवी डी/सी लाइन 9. वधा(cid:14) – जबलपुर पूDलग (cid:9)ट ेशन 765 केवी डी/सी 10. हदै राबाद म(cid:25) (cid:19)ित 2x1500 एमवीए [ांसफाम(cid:14)र के साथ 765/400केवी जीआईएस पूDलग (cid:9)ट ेशन क (cid:9)थ ापना ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएससससआआआआरररर----एएएएपपपपीीीी----00009999 Dहदआु वाइजैग (1040 उ(cid:2)प ादन ि(cid:9)वचयाड-(cid:14) वेमािगरी-II पीपी 400केवी डी/सी \व ैद लाइन मेगावाट) (िनजी ,े9) ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएससससआआआआरररर----एएएएपपपपीीीी----11110000 ल"को क%डाप@ल ी (cid:9)ट ेशन -III ल"को – िवजयवाड़ा 400केवी डी/सी लाइन (मौजूदा) (िनजी ,े9)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 717 ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएससससआआआआरररर----एएएएपपपपीीीी----11111111 रायलसीमा (cid:9)ट ेशन -III (यू-6) आरएसटीपीपी उ(cid:2)प ादन ि(cid:9)वचयाड-(cid:14) िच(cid:2)त ूर 400 केवी डी/सी लाइन (रा3य ,े9) ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएससससआआआआरररर----एएएएपपपपीीीी----11112222 पुिलDचताला (2x30मेगावाट) 1. 132केवी पुिलDचताला एचईपी-िच@ल ाक@ल ू डीसी लाइन (रा3य ,े9) 2. िच@ल ाक@ल ू म(cid:25) 132केवी बे िव(cid:9)त ार ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएससससआआआआरररर----एएएएपपपपीीीी----11113333 लोअर जुराला यू1- 1. 220केवी लोअर जुराला एचईपी ि(cid:9)वचयाड(cid:14)-220/132केवी जुराला 6(6X40मेगावाट)(रा3य ,9े ) सब(cid:9)ट ेशन डी/सी लाइन 2. 400केवी वेलतूर -220केवी जुराला सब(cid:9)ट ेशन , 220केवी डी/सी लाइन ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएससससआआआआरररर----एएएएपपपपीीीी----11114444 lी दामोदरम संजीवैwया टीपीपी 1. कृ_ण पuणम – ने@ल ोर 400केवी \व ैद डी/सी लाइन (कृ_ण पuणम टीपीपी) 2. कृ_ण पuणम –िच(cid:2)त ूर - 400केवी \व ैद डी/सी लाइन (2X800मेगावाट)(रा3य ,9े ) ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएससससआआआआरररर----ककककेेेेएएएए----00001111 टोरंग@ल ू Dजदल यू3 1. टोरंग@ल ू जेएसडN@ य ू – गूटी 400केवी डी/सी लाइन (300मेगावाट) (िनजी ,े9) 2. थोरंग@ल ू जेएसडN@ य ू सब(cid:9)ट ेशन पर आरटीपीएस-गुvटूर का एलआईएलओ ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएससससआआआआरररर----ककककेेेेएएएए----00002222 गुंिडया एचईपी 1. गुं िडया पावर हाउस के िव(cid:17)तु िन_क ष(cid:14)ण के िलए उडूपी और हसन के (2X200मेगावाट)(रा3य ,9े ) समीप नां'दकुर (नागाजनु(cid:14) टीपीपी) के नीचे डी/सी लाइन% म(cid:25) से एक का एलआईएलओ 2. 400केवी के )प म(cid:25) गुंिडया एचईपी के िलए वो@ट ेज (cid:9)थ ािपत करना 400केवी ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएससससआआआआरररर----ककककेेेेएएएए----00003333 येरामा)स (1600 1. एदलापुर टीपीएस – येरमा)स टीपीएस सब(cid:9)ट ेशन 400 केवी डीसी िvवन मेगावाट) मूस लाइन 2. रायचुर सीमांत Dबद ुको एरामरास टीपीएस ि(cid:9)वचयाड (cid:14) तक िशJट करन े के (रा3य ,े9) एदलापुर साथ-साथ \व ैद कंड\ट र सिहत मौजूदा रायचूर टीपीएस-दवे निगर (800मेगावाट) 400केवी एस/सी लाइन को 400 केवी डीसी लाइन के )प म(cid:25) प(cid:27)रव*तत (रा3य ,े9) करना 3. बीटीपीएस-िह(cid:27)रयरु (िनमा(cid:14)णाधीन) 400केवी डीसी िvवन लाइन 4. बीटीपीएस– मधुिगरी(तुमकुर) – 400 केवी \व ैद डीसी लाइन718 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] आईएसटीएस और उ(न त 1. येरामरस टीपीएस-रायचरु ((य )ू 400केवी \व ैद डीसी लाइन िव(cid:29)व सनीयता के साथ अित(cid:27)र\त इंटर कने\श न के िलए (cid:19)णाली ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएससससआआआआरररर----ककककेेेेएएएए----00004444 कुडगी चरण -I 1. कुडगी टीपीएस – नरे(F ((य )ू 400 केवी 2xडी/सी \व ैद लाइन(cid:25) (के(F ीय ,े9) 2. नरे(F ((य )ू – मधुिगरी 765 केवी डी/सी लाइन (3x800 मेगावाट) 3. मधुिगरी – िबडाडी 400 केवी डी/सी (\व ैद)लाइन ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएससससआआआआरररर----ककककेेेेएएएए----00005555 सुरेना पावर िलिमटेड सुरेना उ(cid:2)प ादन ि(cid:9)वचयाड (cid:14) – रायचुर 400केवी डी/सी लाइन (420 मेगावाट) ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएससससआआआआरररर----ककककेेेेईईईई----00001111 थो(cid:27)uयार (2X80मेगावाट) 1 . िन_क ष(cid:14)ण के िलए उ(cid:2)प ादन को 220केवी तक (cid:9)थ ािपत करना (रा3य ,े9) 2. मौजूदा 110केवी कोडाकारा सब(cid:9)ट ेशन को 220केवी तक उ(न ियत करना 3. ि(cid:9)वचरयाड (cid:14) से कोडाकारा सब(cid:9)ट ेशन का 220केवी डी/सी लाइन 4. इडु\क -कोिजकोड 220केवीएस/सी लाइन कोडाकारा का एलआईएलओ ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएससससआआआआरररर----ककककेेेेईईईई----00002222 पि@लवासल एचईपी (60 1. िन€न (cid:9)त र पर िन_क ष(cid:14)ण (मौजूदा) मेगावाट) (रा3य ,े9) ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएससससआआआआरररर----टटटटीीीीएएएएनननन----00001111 तूितको(cid:27)रन जेवी(500 मेगावाट) तुितको(cid:27)रना-मदरु ई 400केवी डी/सी लाइन (\व ैद कंड\ट र) (के(F ीय ,े9) ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएससससआआआआरररर----टटटटीीीीएएएएनननन----00002222 तूितको(cid:27)रन एलटीओए पावर प(cid:27)रयोजना(cid:31) [(को(cid:9)ट ल एनजWन (cid:19)ाइवेट िलिमटेड प(cid:27)रयोजना(1200मेगावाट), इंड-बराथ पावर (मFास) िलिमटेड प(cid:27)रयोजना (1320मेगावाट)] के िलए सम*पत पारेषण (cid:19)णाली को(cid:9)ट ल एनजWन (cid:19)ाइवेट िलिमटेड 1. उ(cid:2)प ादन 400केवी पर (cid:9)थ ािपत 'कया जाएगा। प(cid:27)रयोजना (मेलामु)थुर टीपीपी) 2. को(cid:9)ट ल एनजWन जेनरेशन ि(cid:9)वचयाड (cid:14) –संब- बे सिहत तूितको(cid:27)रन (2x600मेगावाट) पूDलग (cid:9)ट ेशन 400केवी डी/सी \व ैद लाइन इंड-बराथ पावर (मFास् ) िलिमटेड 1. उ(cid:2)प ादन 400केवी पर (cid:9)थ ािपत 'कया जाएगा। प(cid:27)रयोजना (1320मेगावाट) 2. इंड बराथ पावर जेनरेशन ि(cid:9)वचयाड (cid:14) –संब- बे सिहत तूितको(cid:27)रन पूDलग (cid:9)ट ेशन 400केवी डी/सी \व ैद लाइन¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 719 ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएससससआआआआरररर----टटटटीीीीएएएएनननन----00003333 तूितको(cid:27)रन एलटीओए पावर 1. तूितको(cid:27)रन म(cid:25) 765 केवी पूDलग (cid:9)ट ेशन क (cid:9)थ ापना (शु)आत म(cid:25) प(cid:27)रयोजना(cid:31) [(को(cid:9)ट ल एनजWन 400 केवी पर (cid:19)भा(cid:27)रत) (cid:19)ाइवेट िलिमटेड 2. तूितको(cid:27)रन पूDलग (cid:9)ट ेशन पर तूितको(cid:27)रन जेवी- मदरु ई 400 केवी प(cid:27)रयोजना(1200मेगावाट), इंड- डी/सी \व ैद लाइन के दोन% सgकट% का एलआईएलओ बराथ पावर (मFास) िलिमटेड 3 सलेम पुDलग (cid:9)ट ेशन- सलमे 400 केवी डी/सी (\व ैद) लाइन । प(cid:27)रयोजना (1320मेगावाट)] के 4. तूितको(cid:27)रन पूDलग (cid:9)ट ेशन – सलेम पूDलग (cid:9)ट ेशन 765 केवी डी/सी िलए साझा पारेषण (cid:19)णाली लाइन (शु)आत म(cid:25) 400 केवी पर (cid:19)भा(cid:27)रत) 5. सलेम पूDलग (cid:9)ट ेशन – मधुिगरी पुDलग (cid:9)ट ेशन 765 केवी एस/सी लाइन (शु)आत म(cid:25) 400 केवी पर (cid:19)भा(cid:27)रत) 6. तूितको(cid:27)रन पूDलग (cid:9)ट ेशन, सलेम पूDलग (cid:9)ट ेशन, सलेम और मधुिगरी से संब- 400 केवी बे 7 सलेम म(cid:25) 765 केवी पूDलग (cid:9)ट ेशन क (cid:9)थ ापना (शु)आत म(cid:25) 400 केवी पर (cid:19)भा(cid:27)रत) ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएससससआआआआरररर----टटटटीीीीएएएएनननन----00004444 तिमलनाडु म(cid:25) नागाप(cid:27)uणम और कु†ालोर ,े9 म(cid:25) आईसीजीएस प(cid:27)रयोजना के िलए तरु ंत िन_क ष(cid:14)ण [ (एनएसएल नागाप(cid:27)uणम(1320 मेगावाट), पीपीएन पावर जेनरेzटग कंपनी (1080 मेगावाट) , आईएल एडं एफएस (1200 मेगावाट), पीईएल पावर(1050 मेगावाट), चेिvनाद पावर(1320)](िनजी ,े9) एनएसएल नागाप(cid:27)uणम (1320 1. उ(cid:2)प ादन-ि(cid:9)वचयाड-(cid:14) नागाप(cid:27)uणम पूDलग (cid:9) टेशन 400केवी डी/सी मेगावाट) \व ैद या एचटीएलएस लाइन 2. उ(cid:2)प ादन ि(cid:9)वचयाड (cid:14) पर 125 एमवीएआर बस (cid:27)रए\ट र । पीपीएन पावर जेनरेzटग कंपनी 1. उ(cid:2)प ादन-ि(cid:9)वचयाड-(cid:14) नागाप(cid:27)ट्टणम पूDलग (cid:9)ट ेशन 400केवी डी/सी (1080 मेगावाट) लाइन 2. उ(cid:2)प ादन ि(cid:9)वचयाड (cid:14) पर 80 एमवीएआर बस (cid:27)रए\ट र । पीईएल पावर िलिमटेड (1050 1. उ(cid:2)प ादन-ि(cid:9)वचयाड-(cid:14) नागाप(cid:27)ट्टणम पूDलग (cid:9)ट ेशन 400केवी डी/सी मेगावाट) \व ैद लाइन 2. उ(cid:2)प ादन ि(cid:9)वचयाड (cid:14) पर 125 एमवीएआर बस (cid:27)रए\ट र आईएल एडं एफएस तिमलनाडु 1. उ(cid:2)प ादन-ि(cid:9)वचयाड-(cid:14) नागाप(cid:27)ट्टणम पूDलग (cid:9)ट ेशन 400केवी डी/सी पावर कंपनी िलिमटेड (1200 \व ैद लाइन मेगावाट) 2. उ(cid:2)प ादन ि(cid:9)वचयाड (cid:14) पर 125 एमवीएआर बस (cid:27)रए\ट र । चे(cid:27)uनाद पावर कारपोरेशन 1. उ(cid:2)प ादन-ि(cid:9)वचयाड-(cid:14) नागाप(cid:27)ट्टणम पूDलग (cid:9)ट ेशन 400केवी डी/सी िलिमटेड (1320 मेगावाट) \व ैद लाइन 2. उ(cid:2)प ादन ि(cid:9)वचयाड (cid:14) पर 125 एमवीएआर बस (cid:27)रए\ट र ।720 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएससससआआआआरररर----टटटटीीीीएएएएनननन----00005555 तिमलनाडु के नागाप(cid:27)uणम 1. शाट(cid:14) सgकट एमवीए को कं[ोल करने के िलए भाग Šय व(cid:9)थ ा सिहत और कु†ालोर ,े9 म(cid:25) नागाप(cid:27)uणम (जीआईएस) म(cid:25) (य ू 765/400केवी पूDलग (cid:9)ट ेशन (शु)आत आईसीजीएस प(cid:27)रयोजना के म(cid:25) 400 केवी पर (cid:19)भा(cid:27)रत) िलए साझा पारेषण (cid:19)णाली 2. नागाप(cid:27)uणम पूDलग (cid:9)ट ेशन म(cid:25) आरंिभक Šय व(cid:9)थ ा के िलए नेवेली-ि9िच 400केवी एस/सी लाइन का एलआईएलओ जो बाद म(cid:25) 20'कमी तक बाइपास हो जाएगा । 3. नागाप(cid:27)uणम पूDलग (cid:9) टेशन-सलेम 765केवी डी/सी लाइन (शु)आत म(cid:25) 400 केवी पर (cid:19)भा(cid:27)रत) के समापन के िलए नागाप(cid:27)uणम पूDलग (cid:9)ट ेशन और सलेम म(cid:25) से (cid:19)(cid:2)य ेक पर दो 400 केवी बे जो टै(cid:27)रफ आधा(cid:27)रत बोली (cid:19)'(cid:15)या के िलए काया(cid:14)ि(वत क जा रही ह।ै 4. सलेम-मधुिगरी 765केवी एस/सी लाइन-2 (शु)आत म(cid:25) 400 केवी पर (cid:19)भा(cid:27)रत) के समापन के िलए सलेम और मधुिगरी म(cid:25) से (cid:19)(cid:2)य ेक पर एक 400 केवी बे जो टै(cid:27)रफ आधा(cid:27)रत बोली (cid:19)'(cid:15)या के िलए काया(cid:14)ि(वत क जा रही ह।ै 5. मधुिगरी-नरे(F 765केवी डी/सी लाइन (शु)आत म(cid:25) 400 केवी पर (cid:19)भा(cid:27)रत) के समापन के िलए मधुिगरी और नरे(F म(cid:25) से (cid:19)(cid:2)य ेक पर दो 400 केवी बे जो टै(cid:27)रफ आधा(cid:27)रत िबDडग के िलए काया(cid:14)ि(वत क जा रही ह।ै 6. को@ह ापुर –पागढे 765केवी डी/सी लाइन (एक सgकट पुणे के Pारा) (शु)आत म(cid:25) 400 केवी पर (cid:19)भा(cid:27)रत) के समापन के िलए को@ह ापुर, पागढे और पुणे म(cid:25) से (cid:19)(cid:2)य ेक पर दो 400 केवी बे काया(cid:14)ि(वत क जा रही ह।ै 7. नागाप(cid:27)ट्टणम पुDलग (cid:9) टेशन- सलेम 765केवी डी/सी लाइन 8. सलेम-मधुिगरी 765केवी एस/सी लाइन 9. मधुिगरी-बंगलोर 400केवी डी/सी \व ैद लाइन ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएससससआआआआरररर----टटटटीीीीएएएएनननन----00006666 रेगन पावरटेक (cid:19)ाइवेट रेगन पूDलग (cid:9)ट ेशन पुगलुर 230केवी डी/सी (िvवन मूज) लाइन (कनेि\टवटी) िलिमटेड (600 मेगावाट) ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएससससआआआआरररर----टटटटीीीीएएएएनननन----00007777 उडनगुडी 1. उडनगुडी टीपीएस – कराइकुडी 400 केवी डी/सी \व ैद लाइन (1600मेगावाट)(रा3य ,े9) 2. उडनगुडी टीपीएस – कायाथर 400 केवी डी/सी \व ैद लाइन ततततााााििििललललककककाााा सससस..ंं..ंं :::: एएएएससससआआआआरररर----टटटटीीीीएएएएनननन----00008888 कलप\क म पीएफबीआर 1. काकाप\क म – अ*ण 230 केवी डी/सी लाइन (500मेगावाट) 2. काकाप\क म पीएफबीआर– कांचेपुरम 230 केवी डी/सी लाइन (के(F ीय ,े9) 3. काकाप\क म पीएफबीआर –िस)च(cid:27)र 230 केवी डी/सी लाइन 4. काकाप\क म – एमएपीएस 230 केवी एस/सी केबल¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 721 अअअअननननबबुुबबुु धधंंधधंं ---- 7777....4444 पपपपूवूवूवूव0000 (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे –––– पपपपााााररररेेेेषषषषणणणण ययययोोोोजजजजननननाााा ककककाााा ििििववववववववररररणणणण पूव] ,े9 – (cid:19)णाली सशि(cid:129)करण हते ु योजनाए ं : ततततााााििििललललककककाााा सससस..ंं..ंं ईईईई....आआआआरररर....----आआआआईईईईएएएएसससस----00001111 पूव] ,े9 (cid:19)णाली 1. सासाराम-डा@ट नगंज 400 के.वी. डी/सी लाइन सशि(cid:129)करण हते ु 2. म(cid:25)धासाल-पटनाय\य 400 के.वी. डी/सी लाइन योजना-।।। 3. ल,ीसराय म(cid:25) कहलगांव- िबहारसरीफ 400 के.वी. डी/सी लाइन ((cid:19)थम लाइन) का एलआईएलओ 4. बांका म(cid:25) कहलगांव- िबहारसरीफ 400 के.वी. डी/सी लाइन (िPतीय लाइन) का एलआईएलओ 5. बोलंगीर म(cid:25) मेरामुंडाली-जयपुर 400 के.वी. एस/सी लाइन का एलआईएलओ 6. केवनझार म(cid:25) रांगली-बारीपाड़ा 400 के.वी. एस/सी लाइन का एलआईएलओ 7. डुबरी (ओपीटीसीएल) म(cid:25) बारीपाड़ा-म(cid:25)धासाल के 400 के.वी. डी/सी लाइन के एक सgकट का एलआईएलओ 8. चैबासा म(cid:25) जमशेदपुर-राउरकेला 400 के.वी. डी/सी लाइन का एलआईएलओ 9. डा@ट नगंज ((य )ू 2x315 एम.वी.ए., 400/220 के.वी. सब (cid:9)ट ेशन 10.ल,ीसराय ((य )ू 2x200 एम.वी.ए., 400/132 के.वी. सब (cid:9)ट ेशन 11. बांका ((य )ू 2x200 एम.वी.ए., 400/132 के.वी. सब (cid:9)ट ेशन 12.बोलंगीर ((य )ू 2x315 एम.वी.ए., 400/220 के.वी. सब (cid:9)ट ेशन. 13. केवनझार ((य )ू 2x315 एम.वी.ए., 400/220 के.वी. सब (cid:9)ट ेशन 14. चैबासा ((य )ू 2x315 एम.वी.ए., 400/220 के.वी. सब (cid:9)ट ेशन 15. पटनाय\य ((य )ू 2x315 एम.वी.ए., 400/220 के.वी. सब (cid:9)ट ेशन ततततााााििििललललककककाााा सससस..ंं..ंं ईईईई....आआआआरररर....----आआआआईईईईएएएएसससस----00002222 पूव] ,े9 (cid:19)णाली 1. िसिलगुड़ी 220/132 के.वी. सब-(cid:9)ट ेशन पर संबं- खंड (एसोिसएटेड बे) के साथ सशि(cid:129)करण हते ु 1X160 एम.वी.ए., 220/132 के.वी. का अित(cid:27)र\त [ासं फारमर योजना-IV 2. बीरापाड़ा 220/132 के.वी. सब-(cid:9)ट ेशन पर संब-ं खंड (बे) के साथ 1X160 एम.वी.ए., 220/132 के.वी. [ांसफारमर Pारा 1X50 एम.वी.ए., 220/132 के.वी. [ांसफारमर का (cid:19)ित(cid:9)थ ापन 3. मालदा सब (cid:9)ट ेशन पर 400 के.वी. मालदा-फर\क ा-। फ डर के (cid:9)थ ान पर अित(cid:27)र\त खंड/|ेकर (एिडशनल बे/|ेकर) का अिध_ठ ापन 5. मालदा 400/220 के.वी. सब-(cid:9)ट ेशन पर संबं- खंड (बे) के साथ 2X160 एम.वी.ए., 220/132 के.वी. [ांसफारमर Pारा 2X50 एम.वी.ए., 220/132 के.वी. [ांसफारमर का (cid:19)ित(cid:9)थ ापन722 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ततततााााििििललललककककाााा सससस..ंं..ंं ईईईई....आआआआरररर....----आआआआईईईईएएएएसससस----00003333 पूव] ,े9 (cid:19)णाली 1. 400/220 के.वी., 2X500 एम.वी.ए. राजरहाट सब (cid:9)ट ेशन क (cid:9)थ ापना सशि(cid:129)करण हते ु योजना -V 2. राजरहाट म(cid:25) सुभास>ाम-जीरत 400 के.वी., एस/सी लाइन का एलआईएलओ 3. राजरहाट-पू*नया400 के.वी., डी/सी लाइन ((cid:27)[पल (cid:9)न ोबड)(cid:14) , िजसके एक सgकट का एलआईएलओ गोकणा(cid:14) तथा दसू रे का फर\क ा ततततााााििििललललककककाााा सससस..ंं..ंं ईईईई....आआआआरररर....----आआआआईईईईएएएएसससस----00004444 पूव] ,े9 (cid:19)णाली 1. खड़गपुर-चैबासा 400 के.वी., डी/सी लाइन सशि(cid:129)करण हते ु 2. पु)िलया पीएसएस-रांची 400 के.वी., डी/सी लाइन योजना -VII ततततााााििििललललककककाााा सससस..ंं..ंं ईईईई....आआआआरररर....----आआआआईईईईएएएएसससस----00005555 पूव] ,े9 (cid:19)णाली 1. मोतीहारी (2xडी/सी \व ाड) म(cid:25) बढ़-गोरखपुर 400 के.वी., डी/सी लाइन का सशि(cid:129)करण हते ु एलआईएलओ योजना 2. मुजJफरपुर-दरभंगा (cid:27)[पल (cid:9)न ोबड (cid:14) कंड\ट र के साथ 400 के.वी., डी/सी लाइन -VI 3. दरभंगा (जीआईएस) म(cid:25) भिव_य के िव(cid:9)त ार हते ु (cid:9)थ ान सिहत 2x500 एम.वी.ए. 400 के.वी., सब (cid:9)ट ेशन 4. मोतीहारी (जीआईएस) म(cid:25) भिव_य के िव(cid:9)त ार हते ु (cid:9)थ ान सिहत 2x200 एम.वी.ए. 400/132 के.वी., सब (cid:9)ट ेशन 5. बढ़-मोतीहारी खंड हते ु ( 600 ओ} एनजीआर) के साथ मोतीहारी छोर पर 2x80 एम.वी.ए.आर. के (ि(cid:9)वचएबल) लाइन (cid:27)रए\ट र 6. मोतीहारी-गोरखपुर खंड हते ु ( 400 ओ} एनजीआर) के साथ मोतीहारी छोर पर 2x50 एम.वी.ए.आर के ('फ\(cid:9) ड ) लाइन (cid:27)रए\ट र पपपपूवूवूवूव0000 (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे हहहहततेेततेे ुु ुुििििननननPPPPकक कक षषषषणण(cid:8)(cid:8)णण(cid:8)(cid:8) (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी :::: ततततााााििििललललककककाााा सससस..ंं..ंं ईईईई....आआआआरररर....----बबबबीीीी....आआआआरररर----00001111 बढ़-II यू 1,2 (1320 मेगावाट) बढ़-II - गोरखपुर 400के.वी. डी/सी लाइन (\व ाड) (क(cid:25)Fीय खंड) ततततााााििििललललककककाााा सससस..ंं..ंं ईईईई....आआआआरररर....----बबबबीीीी....आआआआरररर----00002222 नबीनगर स.ं उ. नबीनगर-सासाराम िvवन लDै पग कंड\ट र के साथ 400 के.वी. डी/सी (आरएलवाई+एनटीपीसी) लाइन (1000मेगावाट) (क(cid:25)Fीय खंड) ततततााााििििललललककककाााा सससस..ंं..ंं ईईईई....आआआआरररर....----बबबबीीीी....आआआआरररर----00003333 (य ू नबीनगर सं.उ. 1. नबीनगर-गया 400 के.वी. डी/सी (\व ाड) लाइन (िबहार+एनटीपीसी) 2. नबीनगर-पटना 400 के.वी. डी/सी (\व ाड) लाइन (1980 मेगावाट) 3. गया 765/400 के.वी. 1x1500 एम.वी.ए. [ांसफारमर का संवध(cid:14)न (क(cid:25)Fीय खंड)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 723 ततततााााििििललललककककाााा सससस..ंं..ंं ईईईई....आआआआरररर....----बबबबीीीी....आआआआरररर----00004444 मुजJफरपुर िव(cid:9)त ार सं.उ. वत(cid:14)मान (cid:19)णाली पया(cid:14)Oत होगी (390 मेगावाट) (क(cid:25)Fीय खंड) ततततााााििििललललककककाााा सससस..ंं..ंं ईईईई....आआआआरररर....----जजजज..ेे..ेे एएएएचचचच....----00001111 बोकारो िव(cid:9)त ार 1. बोकारो िव(cid:9)त ार-कोडमा(cid:14) 400 के.वी. डी/सी लाइन (500 मेगावाट) (क(cid:25)Fीय खंड) ततततााााििििललललककककाााा सससस..ंं..ंं ईईईई....आआआआरररर....----जजजज..ेे..ेे एएएएचचचच....----00002222 सम*पत (cid:19)णाली आधुिनक पावर, कारपोरेट पावर ((cid:19)थम एवं िPतीय फेज), ए(cid:9)स ार पावर आधुिनक पावर.(540 मेगावाट) 1.आधुिनक टीपीएस-जमशेदपुर 400 के.वी. डी/सी लाइन (िनजी ,े9) कारपोरेट (cid:19)थम फेज (माता lी ऊषा 2. कारपोरेट (cid:19)थम फेज टीपीएस-रांची 400 के.वी. डी/सी लाइन टीपीपी ( 540 मेगावाट) (िनजी ,े9) कारपोरेट िPतीय फेज ( 540 3. कारपोरेट िPतीय फेज टीपीएस-झारखंड पूDलग (cid:9)ट ेशन 400 के.वी. मेगावाट) डी/सी लाइन (िनजी ,े9) इले\[ ो(cid:9)ट ील टीपीएस (ए(cid:9)स ार 4. इले\[ ो(cid:9)ट ील टीपीएस - झारखंड पूDलग (cid:9)ट ेशन 400 के.वी. \व ाड पावर) ( 1200 मेगावाट) डी/सी लाइन (िनजी ,े9) ततततााााििििललललककककाााा सससस..ंं..ंं ईईईई....आआआआरररर....----जजजज..ेे..ेे एएएएचचचच....----00003333 झारखंड [(आधुिनक पावर (540 1. रांची-गया (cid:9)ट ेशन 400 के.वी. (\व ाड) डी/सी लाइन वाया ए(cid:9)स ार/कारपोरेट उ(cid:2)प ादन प(cid:27)रयोजना मेगावाट), कारपोरेट (540+540 के िनकट (cid:19)(cid:9)त ािवत पूDलग (cid:9)ट ेशन मेगावाट), ए(cid:9)स ार पावर (1200 मेगावाट)] के भाग-क हते ु (cid:19)थम फेज 2. रांची (य ू (765/400 के.वी. सब (cid:9)ट ेशन ) –धम(cid:14)जयगढ़/कोरबा के क िव(cid:17)ुत उ(cid:2)प ादन प(cid:27)रयोजना(cid:31) हते ु िनकट 765 के.वी. एस/सी साझा (cid:19)णाली सशि(cid:129)करण 3. ए(cid:9)स ार एवं कारपोशरेट उ(cid:2)प ादन के(F के िनकट 400 के.वी. पूDलग (cid:9)ट ेशन (झारखंड पूल) क (cid:9)थ ापना। यह आईटीसी के िबना ि(cid:9)वDचग (cid:9)ट ेशन होगा। 4. वाराणसी म(cid:25) 2x1500 एम.वी.ए. 765/400 के.वी. का एक नया सब (cid:9)ट ेशन 5. गया-वाराणसी म(cid:25) 765 के.वी. एस/सी 6. वाराणसी-बिलया 765 के.वी. एस/सी ततततााााििििललललककककाााा सससस..ंं..ंं ईईईई....आआआआरररर....----जजजज..ेे..ेे एएएएचचचच....----00004444 झारखंड [(आधुिनक पावर (540 1. कानपुर म(cid:25) 2x1500 एम.वी.ए., 765/400 के.वी. का नया सब (cid:9)ट ेशन724 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] मेगावाट), कारपोरेट (540+540 2. वाराणसी-कानपुर 765 के.वी. डी/सी मेगावाट), ए(cid:9)स ार पावर (1200 3. कानपुर-झ(cid:27)टकारा 765 के.वी. एस/सी मेगावाट)] के भाग-ख हते ु (cid:19)थम फेज 4. कानपुर ( 765/400 के.वी.) कानपुर (मौजूदा) 400 के.वी. डी/सी क िव(cid:17)ुत उ(cid:2)प ादन प(cid:27)रयोजना(cid:31) हते ु (\व ाड) साझा (cid:19)णाली सशि(cid:129)करण 5. वाराणसी-सारनाथ (यूपीपीसीएल) 400 के.वी. डी/सी (\व ाड) 6. वाराणसी म(cid:25) सासाराम-इलाहाबाद 400 के.वी. लाइन का एलअसईएलओ 7. िनजी ,े9 लाइन धम(cid:14)जयगढ़-जबलपुर 765 के.वी. डी/सी लाइन (दसू री लाइन) िनजी ,े9 के अधीन होगी। ततततााााििििललललककककाााा सससस..ंं..ंं ईईईई....आआआआरररर....----जजजज..ेे..ेे एएएएचचचच....----00005555 ितलैया यूएमपीपी (4000 मगे ावाट) 1. ितलैया यूएमपीपी-बिलया 765 के.वी. डी/सी लाइन िनजी ,े9 2. ितलैया यूएमपीपी-गया 765 के.वी. एस/सी लाइन 3. गया म(cid:25) ितलैया यूएमपीपी-बिलया 765 के.वी. डी/सी लाइन के एक सgकट का एलआईएलओ ततततााााििििललललककककाााा सससस..ंं..ंं ईईईई....आआआआरररर....----जजजज..ेे..ेे एएएएचचचच....----00006666 ितलैया, बढ़-।। एवं नबीनगर सं.उ. 1. बिलया-लखनऊ 765 के.वी. एस/सी (िPतीय) (आरएलवाई +एनटीपीसी) 2. लखनऊ-बरेली 765 के.वी. एस/सी (िPतीय) 3. बरेली-मेरठ 765 के.वी. एस/सी (िPतीय) 4. मेरठ-म%गा 765 के.वी. एस/सी 5. रांची-पिdमी ,े9 पूDलग (cid:9)ट ेशन 765 के.वी./एस/सी (िPतीय) ततततााााििििललललककककाााा सससस..ंं..ंं ईईईई....आआआआरररर....----ओओओओ....आआआआरररर....----00001111 ओिडसा म(cid:25) (cid:19)थम एव ं िPतीय फेज क िव(cid:17)ुत प(cid:27)रयोजना(cid:31) के िलए सम*पत पारेषण (cid:19)णाली, [(cid:9)ट रलाइट टीपीपी यू. 1 एवं 2, एवं 4 (2400 मेगावाट), मोनेट पावर (1050 मेगावाट), जीएमआर (1050 मेगावाट), नव भारत (1050 मेगावाट), इंड बरत (700 मेगावाट), Dजदल (1200 मेगावाट), ल"को बाबंध (2640 मेगावाट), ल"को (2640 मेगावाट), दरे ंग (1200 मेगावाट)] (cid:9)ट रलाइट टीपीपी यू. 1 एवं 2, 3&4 (cid:9)ट रलाइट टीपीपी-झारसुगुडा 765/400 के.वी., पूDलग (cid:9)ट ेशन 2X400 (2400 मेगावाट) (िनजी ,9े ) के.वी. डी/सी लाइन मानेट पावर (1050 मेगावाट) मोनेट-अंगुल पूDलग Oव ाइंट 400 के.वी., डी/सी लाइन (िनजी ,े9) जीएमआर (1050 मेगावाट) जीएमआर-अंगुल पूDलग Oव ाइंट 400 के.वी., डी/सी लाइन (िनजी ,े9) नव भारत (1050 मेगावाट) नव भारत टीपीपी-अंगुल पूDलग Oव ाइंट 400 के.वी., डी/सी (\व ाड) लाइन (िनजी ,े9)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 725 इंड बरथ (700 मेगावाट) इंड-बरथ टीपीएस-झारसुगुडा 400 के.वी., डी/सी लाइन (िनजी ,े9) Dजदल (1200 मेगावाट) Dजदल टीपीपी-अंगुल पूDलग Oव ाइंट 400 के.वी., डी/सी लाइन (िनजी ,े9) ल"को बाबंध (4x660 मेगावाट) ल"को-अंगुल पूDलग Oव ाइंट 400 के.वी., 2X डी/सी लाइन (िनजी ,े9) दरे ंग टीपीपी (2x600 मेगावाट) दरे ंग-अंगुल पूDलग O वाइंट 400 के.वी., डी/सी लाइन (िनजी ,े9) ततततााााििििललललककककाााा सससस..ंं..ंं ईईईई....आआआआरररर....----ओओओओ....आआआआरररर....----00002222 ओिडसा म(cid:25) (cid:19)थम फेज क िव(cid:17)ुत 1. अंगुल पूDलग (cid:9)ट ेशन-झारसुगुडा पूDलग (cid:9)ट ेशन 765 के.वी., प(cid:27)रयोजना(cid:31) के िलए साझा पारेषण 2xएस/सी (cid:19)णाली, [(cid:9)ट रलाइट टीपीपी यू. 1 एवं 2. झारसुगुडा पूDलग (cid:9)ट ेशन पर राउरकेला-रायगढ़ 400 के.वी. डी/सी 2, 3 एवं 4 (2400 मेगावाट), मोनेट लाइन का एलआईएलओ पावर (1050 मेगावाट), जीएमआर 3. ** अगुल पूDलग (cid:9)ट ेशन पर मेरामुंडाली-जयपुर 400 के.वी. एस/सी (1050 मेगावाट), नव भारत (1050 लाइन का एलआईएलओ 4. ** अगुल पूDलग (cid:9)ट ेशन पर तेलचर-मेरामुंडाली 400 के.वी. डी/सी मेगावाट), इंड बरत (700 मेगावाट), लाइन के एक सgकट का एलआईएलओ Dजदल (1200 मेगावाट), ल"को 5. झारसुगुडा म(cid:25) 2x1500 एम.वी.ए., 765/400 के.वी. पूDलग (cid:9)ट ेशन (2640 मेगावाट)] भाग-क क (cid:9)थ ापना 6. अंगुलम(cid:25) 4x1500 एम.वी.ए., 765/400 के.वी. पूDलग (cid:9)ट ेशन क (cid:9)थ ापना **अंगुल पूDलग (cid:9)ट ेशन तैयार हो जाने पर इन एलआईएलओ का बाद म (cid:25) िवqछ ेद कर 'दया जाएगा। ततततााााििििललललककककाााा सससस..ंं..ंं ईईईई....आआआआरररर....----ओओओओ....आआआआरररर....----00003333 ओिडसा म(cid:25) (cid:19)थम फेज क िव(cid:17)ुत 1. धम(cid:14)जयगढ़/कोरबा के िनकट 765 के.वी. ि(cid:9)वDचग (cid:9)ट ेशन क प(cid:27)रयोजना(cid:31) के िलए साझा पारेषण (cid:9)थ ापना (cid:19)णाली, [(cid:9)ट रलाइट टीपीपी यू. 1एवं 2. जबलपुर म(cid:25) 765/400 के.वी. पूDलग (cid:9)ट ेशन क (cid:9)थ ापना 2, 3 एवं 4 (2400 मेगावाट), मोनेट 3. झारसुगुडा पूDलग (cid:9)ट ेशन-धम(cid:14)जयगढ़/कोरबा के िनकट (प.,े.) 765 के.वी. डी/सी पावर (1050 मेगावाट), जीएमआर 4. धम(cid:14)जयगढ़/कोरबा के िनकट रांची-िसपत के िनकट प.,े. पूDलग 765 (1050 मेगावाट), नव भारत (1050 के.वी. एस/सी लाइन का एलआईएलओ मेगावाट), इंड बरत (700 मेगावाट), 5. धम(cid:14)जयगढ़/कोरबा के िनकट-जबलपुर पूDलग (cid:9)ट ेशन 765 के.वी. Dजदल (1200 मेगावाट), ल"को डी/सी लाइन (2640 मेगावाट)] भाग-ख 6. जबलपुर पूDलग (cid:9)ट ेशन-जबलपुर 400 के.वी. डी/सी (\व ाड) लाइन ततततााााििििललललककककाााा सससस..ंं..ंं ईईईई....आआआआरररर....----ओओओओ....आआआआरररर....----00004444 ओिडसा म(cid:25) (cid:19)थम फेज क िव(cid:17)ुत 1. जबलपुर पूDलग (cid:9)ट ेशन-बीना 765 के.वी. डी/सी लाइन प(cid:27)रयोजना(cid:31) के िलए साझा पारेषण 2. बीना-Tव ािलयर 765 के.वी. एस/सी (तीसरा सgकट)726 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] (cid:19)णाली, [(cid:9)ट रलाइट टीपीपी यू. 1-4 3. Tव ािलयर-जयपुर 765 के.वी. एस/सी (दसू रा सgकट) (2400 मेगावाट), मोनेट पावर 4. जयपुर-िभवानी 765 के.वी. एस/सी लाइन (1050 मेगावाट), जीएमआर (1050 मेगावाट), नव भारत (1050 मेगावाट), इंड बरत (700 मेगावाट), Dजदल (1200 मेगावाट), ल"को (2640 मेगावाट)] भाग-ग ततततााााििििललललककककाााा सससस..ंं..ंं ईईईई....आआआआरररर....----ओओओओ....आआआआरररर....----00005555 ओिडसा म(cid:25) (cid:19)थम फेज क िव(cid:17)ुत 1. 2x1500 एम.वी.ए., 765/400 के.वी. भोपाल पूDलग (cid:9)ट ेशन क प(cid:27)रयोजना(cid:31) के िलए साझा पारेषण (cid:9)थ ापना (cid:19)णाली, [(cid:9)ट रलाइट टीपीपी यू. 1एवं 2. जबलपुर पूल-भोपाल-इंदौर 765 के.वी. एस/सी 2, 3 एवं 4 (2400 मेगावाट), 3. भोपाल (य ू सब (cid:9)टेशन-भोपाल (म.(cid:19).) 400 के.वी. डी/सी (उqच मोनेट पावर (1050 मेगावाट), ,मतायु\त ) जीएमआर (1050 मेगावाट), नव भारत (1050 मेगावाट), इंड बरत (700 मेगावाट), Dजदल (1200 मेगावाट), ल"को (2640 मेगावाट)] भाग-घ ततततााााििििललललककककाााा सससस..ंं..ंं ईईईई....आआआआरररर....----एएएएसससस....एएएएमममम....----00001111 िस'tम म(cid:25) (cid:19)थम फेज क िव(cid:17)ुत प(cid:27)रयोजना(cid:31) के िलए सम*पत पारेषण (cid:19)णाली, [ती(cid:9)त ा-।।। एचईपी (1200 मेगावाट), ती(cid:9)त ा-VI (500 मेगावाट), रंिगत-IV (120 मेगावाट), चुजाचेन (99 मेगावाट), भासमे (51 मेगावाट), जोरेथंग लूप (96 मेगावाट), र%गनीच ू (96 मेगावाट)] ती(cid:9)त ा-।।। एचईपी (1200 ती(cid:9)त ा-।।।-करनदीTघ ी \व ाड मूज कंड\ट र के साथ 400 के.वी. डी/सी लाइन मेगावाट) (िनजी ,े9) ती(cid:9)त ा-VI (500 मेगावाट) (िनजी ती(cid:9)त ा- VI-रांगपो 220 के.वी. डी/सी (िvवन मूज) ,े9) रंिगत-IV (120 मेगावाट) (िनजी रंिगत-IV-(य ू मे@ल ी 220 के.वी. डी/सी लाइन ,े9) भासमे (51 मेगावाट) (िनजी ,े9) भामसे म(cid:25) चुजाचने -रांगपो 132 के.वी. डी/सी के एक सgकट का एलआईएलओ जोरेथांग लूप (96 मेगावाट) जोरेथंग-(य ू मे@ल ी 220 के.वी. डी/सी लाइन (िनजी ,े9) रोगनीचू लूप (96 मेगावाट) र%गनीचू -(य ू मे@ल ी 220 के.वी. डी/सी लाइन (िनजी ,े9)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 727 चुजाचेन एचईपी (99 मेगावाट) चुजाचेन म(cid:25) मे@ल ी-गंगटोक डी/सी (नामथंग म(cid:25) एलआईएलओ Oव ाइंट) का एलआईएलओ (गित) ततततााााििििललललककककाााा सससस..ंं..ंं ईईईई....आआआआरररर....----एएएएसससस....एएएएमममम....----00002222 िस'tम म(cid:25) (cid:19)थम फेज क िव(cid:17)ुत 1. करन'दTघी म(cid:25) 2x315 एम.वी.ए., 400 के.वी. सब (cid:9)ट ेशन क (cid:9)थ ापना प(cid:27)रयोजना(cid:31) के िलए साझा 2. करन'दTघी के नए पूDलग (cid:9) टेशन पर िसिलगुड़ी (मौजूदा)-पु*नया 400 पारेषण (cid:19)णाली, के.वी. डी/सी लाइन (\व ाड) का एलआईएलओ [ती(cid:9)त ा-।।। एचईपी (1200 3. करन'दTघी म(cid:25) \व ाड मूज कंड\ट र लाइन के एलआईएलओ भाग के मेगावाट), ती(cid:9)त ा-VI (500 िनमा(cid:14)ण के साथ िसिलगुड़ी (मौजूदा)-पु*नया 400 के.वी. डी/सी लाइन मेगावाट), रंिगत-IV (120 (िजस पर पीजीसीआईएल Pारा उqच ,मता के एचटीएलएस कंड\ट र सिहत (cid:27)र-कंड\ट zरग 'कया जा रहा ह)ै का एलआईएलओ मेगावाट), चुजाचेन (99 4. करन'दTघी म(cid:25) नये पूDलग (cid:9)ट ेशन पर िसिलगुड़ी –डालखोला 220 के.वी. मेगावाट), भासमे (51 मेगावाट), डी/सी लाइन का एलआईएलओ जोरेथंग लूप (96 मेगावाट), र%गनीच ू (96 मेगावाट)] भाग-क ततततााााििििललललककककाााा सससस..ंं..ंं ईईईई....आआआआरररर....----एएएएसससस....एएएएमममम....----00003333 िस'tम म(cid:25) (cid:19)थम फेज क िव(cid:17)ुत 1. (क). रांगापो म(cid:25) 16x105 एम.वी.ए., 1 पीएच, 400/220 के.वी. और प(cid:27)रयोजना(cid:31) के िलए साझा 3x100 एम.वी.ए., 220/132 के.वी गैस इ(स ुलेटेड सब (cid:9)ट ेशन पारेषण (cid:19)णाली, क (cid:9)थ ापना [ती(cid:9)त ा-।।। एचईपी (1200 1. (ख). रांगापो जीआईएस पर 3x100 एम.वी.ए., 220/132 के.वी मेगावाट), ती(cid:9)त ा-VI (500 टीआरएफ क (cid:9)थ ापना मेगावाट), रंिगत-IV (120 2. (य ू मे@ल ी म(cid:25) 220 के.वी. ि(cid:9)वDचग (cid:9)ट ेशन क (cid:9)थ ापना मेगावाट), चुजाचेन (99 3. रांगपो म(cid:25) ती(cid:9)त ा-।।।-करन'दTघ ी 400 के.वी. \व ाड डी/सी लाइन मेगावाट), भासमे (51 मेगावाट), (संयु\त उप(cid:15)म )ट से तैयार क जानी ह)ै का एलआईएलओ जोरेथंग लूप (96 मेगावाट), 4. (य ू मे@ल ी-रांगपो 220 के.वी. डी/सी लाइन (िvवन मूज कंड\ट र) 5. रांगपो म(cid:25) गंगटोक-रंिगेत 132 के.वी. एस/सी लाइन का एलआईएलओ र%गनीच ू (96 मेगावाट)] भाग-ख तथा रांगपो सब (cid:9)ट ेशन पर गंगटोक-रांगपो /चुजाचेन 132 के.वी. लाइन% (भाग-क के अंतग(cid:14)त रांगपो तक गंगटोक-मे@ल ी 132 के.वी. एस/सी लाइन का एलआईएलओ) का ट*मनेशन 6. रांगपो म(cid:25) मौजूदा ती(cid:9)त ा-V-िसिलगुड़ी 400 के.वी. डी/सी लाइन का एलआईएलओ 7. करन'दTघ ी-पटना (पीजी) 400 के.वी. डी/सी (\व ाड) लाइन ततततााााििििललललककककाााा सससस..ंं..ंं ईईईई....आआआआरररर....----एएएएसससस....एएएएमममम....----00004444 िस'tम म(cid:25) िPतीय फेज क िव(cid:17)ुत प(cid:27)रयोजना(cid:31) के िलए सम*पत पारेषण (cid:19)णाली, ['द\च ू (96 मेगावाट), पानम (300 मेगावाट), zटगzटग (99 मेगावाट), तासीDडग (97 मेगावाट)] 'द\च ू (96 मेगावाट) 1. जे|ा कंड\ट र के साथ 'द\च ू एचईपी-गंगटोक 132 के.वी. डी/सी लाइन (रा3य ,े9) 2. जे|ा कंड\ट र के साथ 'द\च ू एचईपी-मांगन (पीजी) 132 के.वी. डी/सी पानम (300 मेगावाट) 1. पानम-मांगन 400 के.वी. डी/सी लाइन (िनजी ,े9)728 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] zटगzटग (99 मेगावाट) 1. zटगzटग-तासीDडग पीएस 220 के.वी. डी/सी लाइन (िनजी ,े9) तासीDडग (97 मेगावाट) 1. तासीDडग-तासीDडग पीएस 220 के.वी. डी/सी लाइन (िनजी ,े9) ततततााााििििललललककककाााा सससस..ंं..ंं ईईईई....आआआआरररर....----एएएएसससस....एएएएमममम....----00005555 िस'tम म(cid:25) िPतीय फेज क 1. मांगन म(cid:25) 4x105 एम.वी.ए., एकल फेज, 400/132 के.वी. पूDलग (cid:9)ट ेशन िव(cid:17)ुत प(cid:27)रयोजना(cid:31) के िलए क (cid:9)थ ापना साझा पारेषण (cid:19)णाली ['द\च ू 2. ती(cid:9)त ा-।।।-करन'दTघ ी 400 के.वी. डी/सी लाइन का एलआईएलओ (96 मेगावाट), पानम (300 3 िvवन मूज कंड\ट र के साथ मांगन-करन'दTघ ी 400 के.वी. डी/सी लाइन मेगावाट), zटगzटग (99 4. िvवन मूज कंड\ट र (िPतीय लाइन) के साथ (य ू मे@ल ी-रांगपो 220 के.वी. मेगावाट), तासीDडग (97 डी/सी लाइन मेगावाट)] भाग-क ततततााााििििललललककककाााा सससस..ंं..ंं ईईईई....आआआआरररर....----एएएएसससस....एएएएमममम....----00006666 िस'tम म(cid:25) िPतीय फेज क 1. तासीDडग के पास 220 के.वी. गैस इ(स ुलेटेड पूDलग/ि(cid:9)वDचग (cid:9)ट ेशन क िव(cid:17)ुत प(cid:27)रयोजना(cid:31) के िलए (cid:9)थ ापना साझा पारेषण (cid:19)णाली ['द\च ू 2. तासीDडग पूDलग (cid:9)ट ेशन के पास िvवन मूज कंड\ट र के साथ-(य ू मे@ल ी 220 (96 मेगावाट), पानम (300 के.वी. डी/सी लाइन मेगावाट), zटगzटग (99 मेगावाट), तासीDडग (97 मेगावाट)] भाग-ख ततततााााििििललललककककाााा सससस..ंं..ंं ईईईई....आआआआरररर....डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय ..ूू..ूू बबबबीीीी....----00001111 रघुनाथपुर फेज-1, य.ू -1 एवं 2 1. रघुनाथपुर म(cid:25) मैथन (पीजी)-रांची 400 के.वी. लाइन के एक सgकट (2x600 मेगावाट) का एलआईएलओ (क(cid:25)Fीय ,े9) 2. रघुनाथपुर-रांची 400 के.वी. \व ाड डी/सी लाइन ततततााााििििललललककककाााा सससस..ंं..ंं ईईईई....आआआआरररर....डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय ..ूू..ूू बबबबीीीी....----00002222 उ(cid:2)त री ,े9 Pारा डीवीसी से 1. मैथन-गया 400 के.वी. \व ाड डी/सी लाइन िव(cid:17)ुत आयात हते ु साझा पारेषण 2. गया-सासाराम 765 के.वी. एस/सी लाइन (cid:19)णाली 3. गया-बिलया 765 के.वी. एस/सी 4. बिलया-लखनऊ 765 के.वी. एस/सी 5. फतेहपुर म(cid:25) पावरि>ड के 765/400 के.वी. सब (cid:9)ट ेशन पर इलाहाबाद- मैनपुरी 400 के.वी. डी/सी लाइन के दान% सgकट% के एलआईएलओ 6. रांची-पिdम ,े9 पूDलग 765 के.वी. एस/सी 7. सासाराम-फतेहपुर (पीजी 765 के.वी. सब (cid:9)ट ेशन) एस/सी लाइन 8. फतेहपुर (पीजी 765 के.वी. सब (cid:9)ट ेशन)-आगरा 765 के.वी. एस/सी लाइन¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 729 9. िबहारसरीफ-सासाराम (पीजी 765 के.वी. सब (cid:9)ट ेशन) 400 के.वी. \व ाड उी/सी लाइन 10. बिलया छोर पर बढ़-बिलया 400 के.वी. \व ाड डी/सी लाइन का 40% िसरीज कंपनसेशन 11. िबहारसरीफ- बिलया छोर पर िबहारसरीफ-बिलया 400 के.वी. \व ाड डी/सी लाइन का 40% िसरीज कंपनसेशन 12. लखनऊ 765/400 के.वी. नया सब (cid:9)ट ेशन-लखनऊ 400/220 के.वी. मौजूदा सब (cid:9)ट ेशन 400 के.वी. \व ाड 2xडी/सी लाइन 13. बरेली 765/400 के.वी. नया सब (cid:9)ट ेशन-बरेली 400/220 के.वी. मौजूदा सब (cid:9)ट ेशन 400 के.वी. \व ाड 2xडी/सी लाइन (एनकेएसटीपीपी (cid:19)णाली से मेल कराने के िलए) 14. रांची 765/400 के.वी. नया सब (cid:9)ट ेशन-रांची 400/220 के.वी. मौजूदा सब (cid:9)ट ेशन 400 के.वी. \व ाड 2xडी/सी 15.पटना म(cid:25) बढ़-बिलया 400 के.वी. डी/सी \व ाड लाइन के दोन% सgकट% के एलआईएलओ 16 3X1500 एम.वी.ए. [ांसफारमर के साथ गया 765/400 के.वी. सब (cid:9)ट ेशन क (cid:9)थ ापना 17 2X1500 एम.वी.ए. [ांसफारमर के साथ सासाराम 765/400 के.वी. सब (cid:9)ट ेशन क (cid:9)थ ापना 18 2X1500 एम.वी.ए. [ांसफारमर के साथ रांची 765/400 के.वी. सब (cid:9)ट ेशन क (cid:9)थ ापना 19 2X1500 एम.वी.ए. [ांसफारमर के साथ फतेहपुर 765/400 के.वी. सब (cid:9)ट ेशन क (cid:9)थ ापना 20 2X1500 एम.वी.ए. [ांसफारमर के साथ आगरा 765/400 के.वी. सब (cid:9)ट ेशन क (cid:9)थ ापना 21 2X1500 एम.वी.ए. [ांसफारमर के साथ बिलया 765/400 के.वी. सब (cid:9)ट ेशन क (cid:9)थ ापना 22 2X1500 एम.वी.ए. [ांसफारमर के साथ लखनऊ 765/400 के.वी. सब (cid:9)ट ेशन क (cid:9)थ ापना ततततााााििििललललककककाााा सससस..ंं..ंं ईईईई....आआआआरररर....डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय ..ूू..ूू बबबबीीीी....----00003333 पूव] ,े9 म(cid:25) पूDलग (cid:9) टेशन हते ु 1. अलीपुरPार पर नया 2x315 एम.वी.ए., 400/220 के.वी. का पारेषण (cid:19)णाली तथा भूटान म(cid:25) ए.सी. पूDलग (cid:9)ट ेशन प(cid:27)रयोजना(cid:31) से उ(cid:2)त री 2. आगरा म(cid:25) 3000 मेगावाट इ(व ट(cid:14)र मा‘ूल के साथ+800 के.वी. ,े9/पिdमी ,े9 को िव(cid:17)ुत एचवीडीसी (cid:9)ट ेशन का िव(cid:9)त ार अंतरण 3. एचवीडीसी (cid:9)ट ेशन के समानांतर लाइन के (cid:19)चालन हते ु अलीपुरPार म(cid:25) नए पूDलग (cid:9)ट ेशन पर िव(cid:29)व नाथ च(cid:27)रय@ल ी-आगरा एचवीडीसी लाइन का एलआईएलओ730 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 4. अलीपुरPार म(cid:25) नए पूDलग (cid:9)ट ेशन पर ब%गईगांव िसिलगुड़ी 400 के.वी. डी/सी लाइन (\व ाड) (िनजी ,े9 के अधीन) का एलआईएलओ 5. अलीपुरPार म(cid:25) नए पूDलग (cid:9)ट ेशन पर टाला-िसिलगुड़ी 400 के.वी. डी/सी लाइन का एलआईएलओ 6. अलीपुरPार म(cid:25) नए पूDलग (cid:9)ट ेशन पर बीरापाड़ा-सलाकाटी 220 के.वी. डी/सी लाइन का एलआईएलओ 7 अलीपुरPार म(cid:25) नए पूDलग (cid:9)ट ेशन पर + 800 के.वी., 3000 मेगावाट क(व ट(cid:14)र मा‘ूल के साथ एचवीडीसी सब (cid:9)ट ेशन ततततााााििििललललककककाााा सससस..ंं..ंं ईईईई....आआआआरररर....डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय ..ूू..ूू बबबबीीीी....----00004444 सीईएससी हि@दया (600 सीईएससी हि@दया-सुभास>ाम 400 के.वी. डी/सी लाइन मेगावाट) (िनजी ,े9) ततततााााििििललललककककाााा सससस..ंं..ंं ईईईई....आआआआरररर....डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय ..ूू..ूू बबबबीीीी....----00005555 दगु ा(cid:14)पुर डीपीएल (य ू (यू-8) डीपीएल-िवधाननगर 400 के.वी; डी/सी लाइन (250 मेगावाट) (रा3य ,े9) पूव] ,े9-एस.टी.यू. के (cid:19)णाली सशि(cid:129)करण हते ु योजनाए ं ततततााााििििललललककककाााा सससस..ंं..ंं ईईईई....आआआआरररर....----एएएएसससस....एएएएसससस....---- डडडड(cid:31)(cid:31)(cid:31)(cid:31) यय यय ..ूू..ूू बबबबीीीी.... पिdम बंगाल म(cid:25) (cid:19)णाली 1. खडगपुर म(cid:25) कोलाघाट-बीराघाट 400 के.वी. एस/सी लाइन का सशि(cid:129)करण योजना एलआईएलओ 2. चंडीताला-सुभाष>ाम 400 के.वी. डी/सी लाइन 3. चंडीताला-खडगपुर 400 के.वी. डी/सी लाइन --------------------------------------------------------------------------------------------¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 731 अअअअननननबबुुबबुु धधंंधधंं ----7777....5555 उउउउ9999तत तत रररर----पपपपववूूववूू 0000 (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ----पपपपााााररररेेेेषषषषणणणण ययययोोोोजजजजननननाााा ककककाााा ििििववववववववररररणणणण उ(cid:2)त र-पूव]-(cid:19)णाली सशि(cid:129)करण हते ु योजनाए ं ततततााााििििललललककककाााा सससस..ंं..ंं एएएएनननन....ईईईई....आआआआरररर....----आआआआईईईई....एएएएसससस....---- 00001111 एनईआर के िPतीय फेज म(cid:25) पारेषण 1. िबन]हाट म(cid:25) िसलचर-ब%गईगांव 400 के.वी. डी/सी के एक सgकट का सशि(cid:129)करण (िPतीय) का एलआईएलओ 2. भालुकप%ग म(cid:25) बालीपाड़ा-खूपी 132 के.वी. एस /सी का एलआईएलओ 3. एनईआर पीपी (िवVनाथ च(cid:27)रय@ल ी) – ’टानागर (जे|ा कंड\ट र) 132kV डी/सी लाइन 4. पी.के. बारी म(cid:25) पलटन-िसलचर 400 के.वी. डी/सी का एलआईएलओ L 5. भालुकप%ग म(cid:25) पीजी 132/33 के.वी. सब टेशन का िव(cid:9)त ार 6. 50 एम.वी.ए. के चार एकल फेज यूिनट% सिहत पी.के. बारी L 400/132 के.वी. सब टेशन का िव(cid:9)त ार उ(cid:2)त री-पूव]-पारेषण (cid:19)णाली :::: ततततााााििििललललककककाााा सससस..ंं..ंं एएएएनननन....ईईईई....आआआआरररर....----एएएएआआआआररररपपपपीीीी----00001111 पेरे िडकर%ग एचईपी (110 मेगावाट) 1. िडकर%ग एचईपी पर आरएचईपी-।-िनजौली 132 के.वी. सब (cid:9)टेशन का एलआईएलओ (क(cid:25)Fीय ,े9) 2. िडकर%ग एचईपी पर आरएचईपी-।-इडावगर 132 के.वी. डी/सी लाइन के एक सgकट का एलआईएलओ 3. िमसा पर िPतीय 315 एमवीए 400/220 के.वी. आईसीटी ततततााााििििललललककककाााा सससस..ंं..ंं एएएएनननन....ईईईई....आआआआरररर....----एएएएआआआआररररपपपपीीीी----00002222 काम(cid:25)ग एचईपी (600 मेगावाट) 1. काम(cid:25)गपाड़ा-बालीपाड़ा 400 के.वी. डी/सी लाइन (क(cid:25)Fीय ,े9) 2. 30% एफएससी सिहत बालीपाड़ा-ब%गइगांव (\ वाड) 400 के.वी. डी/सी लाइन ततततााााििििललललककककाााा सससस..ंं..ंं एएएएनननन....ईईईई....आआआआरररर....----एएएएआआआआररररपपपपीीीी----00003333 लोअर सुबंिसनी (2000 मेगावाट) लोअर-सुबंिसनी-िव(cid:29)व नाथ च(cid:27)रयाली(पीपी 400 के.वी. 2X (क(cid:25)Fीय ,े9) डी/सी (िvवन लैDपग) ततततााााििििललललककककाााा सससस..ंं..ंं एएएएनननन....ईईईई....आआआआरररर....----एएएएआआआआररररपपपपीीीी----00004444 पूवy(cid:2)त र ,े9 से उ(cid:2)त र/पिdम ,े9 को 1. िव(cid:29)व नाथ च(cid:27)रयाली-आगरा +800 के.वी., 6000 मेगावाट िव(cid:17)ुत अंतरण हते ु साझा पारेषण एचवीडीसी बाईपोल लाइन (cid:19)णाली 2. िव(cid:29)व नाथ च(cid:27)रयाली (पूDलग Oव ाइंट) पर रंगानदी-बालीपाड़ा 400 के.वी. डी/सी लाइन का एलआईएलओ 3. िव(cid:29)व नाथ च(cid:27)रयाली- िव(cid:29)व नाथ च(cid:27)रयाली (एईजीसीएल) 132 के.वी. डी/सी लाइन 4. िव(cid:29)व नाथ च(cid:27)रयाली (2x200 एम.वी.ए.) म(cid:25) 400/132 के.वी. पूDलग (cid:9)ट ेशन क (cid:9)थ ापना732 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 5. िव(cid:29)व नाथ च(cid:27)रयाली म(cid:25) 3000 मेगावाट का एचवीडीसी रेि\टफायर मा‘ूल तथा आगरा म(cid:25) 3000 मेगावाट ,मता का इ(व ट(cid:14)र मा‘ूल 132 के.वी. डी/सी लाइन 6. बालीपाड़ा- िव(cid:29)व नाथ च(cid:27)रयाली (पीपी) 400 के.वी. डी/सी लाइन 7. आगरा म(cid:25) 1x315 एम.वी.ए. 400/220 के.वी. सब (cid:9)ट ेशन ततततााााििििललललककककाााा सससस..ंं..ंं एएएएनननन....ईईईई....आआआआरररर....----एएएएआआआआररररपपपपीीीी----00005555 खुइतम (33 मेगावाट) खुइतम-Dडचंग 220 के.वी. डी/सी लाइन (िनजी ,े9) ततततााााििििललललककककाााा सससस..ंं..ंं एएएएनननन....ईईईई....आआआआरररर....----एएएएआआआआररररपपपपीीीी----00006666 डमे वे लोअर (341 मेगावाट) 1. डमे वे लोअर-काथलगुड़ी 400 के.वी. डी/सी लाइन वाया नामसा’ (िनजी ,े9) पीपी 2. काथलगुड़ी-िमसा 400 के.वी. डी/सी लाइन का (cid:19)चालन 3. 400/220 के.वी. 630 एम.वी.ए. म(cid:27)रयानी सब (cid:9)ट ेशन क (cid:9)थ ापना ततततााााििििललललककककाााा सससस..ंं..ंं एएएएनननन....ईईईई....आआआआरररर....----एएएएआआआआररररपपपपीीीी----00007777 केएसके िडिNबन, पटेल हाइ~ो, ने(cid:127)ा हते ु सम*पत (cid:19)णाली केएसके िडिNबन, हाइ~ो पावर केएसके िडिNबन-Dडचंग पीपी 220 के.वी. डी/सी लाइन िलिमटेड, (2x60 मेगावाट) पटेल हाइ~ो, (cid:19)ाइवेट िलिमटेड (गो(> ी एवं सा(cid:9)> ांग) (3x48+ सा(cid:9)> ांग-गो(> ी 132 के.वी. डी/सी लाइन 2x22.5 मेगावाट) गो(> ी-Dडचंग पीपी 220 के.वी. डी/सी लाइन एसईडN@ य ू ने(cid:127)ा पावर कारपोरेशन ने(cid:127)ा-Dडचंग पीपी 220 के.वी. डी/सी लाइन िलिमटेड (2x60 मेगावाट) आ'दशंकर खुइतम पावर िलिमटेड खुइतम-Dडचंग पीपी 220 के.वी. डी/सी लाइन (3x22 मेगावाट) ततततााााििििललललककककाााा सससस..ंं..ंं एएएएनननन....ईईईई....आआआआरररर....----एएएएआआआआररररपपपपीीीी----00008888 केएसके िडिNबन हाइ~ो पावर 1. रांिगया/रौता म(cid:25) 440/220 के.वी. ,2x315 एम.वी.ए. का पूDलग िलिमटेड, गो(> ी एवं सा(cid:9)> ांग, ने(cid:127)ा (cid:9)ट ेशन पावर तथा आ'दशंकर खुइतम पावर 2. Dडचंग म(cid:25) 440/220 के.वी. 2x315 एम.वी.ए. का पूDलग (cid:9)ट ेशन हते ु साझा पारेषण (cid:19)णाली 3. रांिगया/रौता म(cid:25) ब%गईगांव-बालीपाड़ा 440 के.वी. डी/सी लाइन का एलआईएलओ 4. Dडचंग पीपी-रांिगया/रौता 400 के.वी. डी/सी (\व ाड) लाइन 5. िसलचर-िमसा 400 के.वी. (\व ाड) डी/सी लाइन ततततााााििििललललककककाााा सससस..ंं..ंं एएएएनननन....ईईईई....आआआआरररर....----एएएएएएएएसससस----00001111 ब%गईगांव टीपीपी हते ु सम*पत (cid:19)णाली ब%गईगांव टीपीपी (3x250 ब%गईगांव-ब%गईगांव (पीजी) 400 के.वी. डी/सी लाइन मेगावाट) (क(cid:25)Fीय ,े9)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 733 ततततााााििििललललककककाााा सससस..ंं..ंं एएएएनननन....ईईईई....आआआआरररर....----एएएएएएएएसससस----00002222 ब%गईगांव टीपीपी (750 1. िसलचर-बदरपुर (पीजी) ि(cid:9)व Dचग (cid:9)ट ेशन 132 के.वी. डी/सी लाइन मेगावाट) पलाटना (726 2. िसलचर-पी.के. बारी (टीएसईसीएल) 400 के.वी. डी/सी लाइन (132 मेगावाट) हते ु साझा (cid:19)णाली के.वी. पर आवेिशत) (क(cid:25)Fीय ,े9) 3. िसलचर-मेल(cid:27)रयात (य ू पीजी 400 के.वी. डी/सी लाइन (132 के.वी. पर आवेिशत) 4. िसलचर-इ€फ ाल 400 के.वी. डी/सी लाइन (132 के.वी. पर आवेिशत) 5. मेल(cid:27)रयात ((य )ू -मेल(cid:27)रयात (िमजोरम) 132 के.वी. डी/सी लाइन 6. िसलचर-lीकोना (एईजीसीएल) 132 के.वी. डी/सी लाइन 7. िसलचर-हले ाकांडी (एईजीसीएल) 132 के.वी. डी/सी लाइन 8. इ€फ ाल ((य )ू पर लोकटक-इ€फ ाल (पीजी) 132 के.वी. डी/सी लाइन का एलआईएलओ 9. म(cid:27)रयानी ((य )ू पर कथलगुड़ी-मीसा 400 के.वी. डी/सी लाइन के एक सgकट का एलआईएलओ (132 के.वी. पर आवेिशत) 10. . म(cid:27)रयानी ((य )ू -मोकोचुंग (पीजी) 220 के.वी. डी/सी लाइन 11. जे|ा कंड\ट र के साथ मोकोचुंग (पीजी)-मोकोचुंग (नागाल"ड) 132 के.वी. डी/सी लाइन 12. पासीघाट-रो’ग डी/सी लाइन पर 132 के.वी. एस/सी 13. रो’ग-तेजू डी/सी लाइन पर 132 के.वी. एस/सी 14. तेज-ू नामसा’ डी/सी लाइन पर 132 के.वी. एस/सी 15. 400/132 के.वी. िसलचर सब (cid:9)ट ेशन (2x200 एम.वी.ए.) क (cid:9)थ ापना 16. मेल(cid:27)रयात 132/33 के.वी. (400 के.वी. पर अप>ेड 'कए जान े योTय ) (2x50 एम.वी.ए.) सब (cid:9)ट ेशन क (cid:9)थ ापना 17. इ€फ ाल ((य )ू 132/33 के.वी. (400 के.वी. पर अप>ेड 'कए जाने योTय ) (2x50 एम.वी.ए.) सब (cid:9)ट ेशन क (cid:9)थ ापना 18. म(cid:27)रयानी 220 के.वी. (400 के.वी. पर अप>ेड 'कए जाने योTय ) ि(cid:9)वDचग (cid:9)ट ेशन क (cid:9)थ ापना 19. मोकोकचुंग 220/132 के.वी. (7x10 एम.वी.ए. एक (cid:9)प ेयर) सब (cid:9)ट ेशन क (cid:9)थ ापना 20. रो’ग 132/33 के.वी. (एकल फेज 7x5 एम.वी.ए., एक (cid:9)प ेयर) सब (cid:9)ट ेशन क (cid:9)थ ापना 21. तेज ू 132/33 के.वी. (एकल फेज 7x5 एम.वी.ए., एक (cid:9)प ेयर) सब (cid:9)ट ेशन क (cid:9)थ ापना 22. नामसाई 132 के.वी. (2x15 एम.वी.ए.) सब (cid:9)ट ेशन क (cid:9)थ ापना734 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 23. िसलचर म(cid:25) (2x63 एम.वी.ए.आर.) बस (cid:27)रए\ट र 24. ब%गईगांव म(cid:25) (1x80एम.वी.ए.आर.) बस 25. िसलचर छोर पर पलाटना-िसलचर 400 के.वी. डी/सी लाइन के (cid:19)(cid:2)य के सgकट म(cid:25) 50 एम.वी.ए.आर. के लाइन (cid:27)रए\ट र 26. िसलचर एवं ब%गईगांव छोर पर िसलचर-ब%गईगांव 400 के.वी. डी/सी लाइन के (cid:19)(cid:2)य ेक सgकट म(cid:25) 63 एम.वी.ए.आर. के लाइन (cid:27)रए\ट र 27. बीटीपीएस (एनटीपीसी) म(cid:25) 400/ 220 के.वी. (2x315 एम.वी.ए. [ांसफारमर) 28. पलाटना म(cid:25) 400/ 132 के.वी. (2x200 एम.वी.ए. [ांसफारमर) 29. पलाटना छोर पर पलाटना-िसलचर 400 के.वी. डी/सी लाइन के (cid:19)(cid:2)य के सgकट म(cid:25) 50 एम.वी.ए.आर. के लाइन (cid:27)रए\ट र 30. पलाटना जीबीपीपी पर 80 एम.वी.ए.आर. के बस (cid:27)रए\ट र 31. (य ू गुवाहाटी (अजारा) म(cid:25) िसलचर-ब%गईगांव 400 के.वी. डी/सी लाइन के दोन% सgकट% के एलआईएलओ 32. (य ू गुवाहाटी (अजारा) 400/220 के.वी. सब (cid:9)ट ेशन (2x315 एम.वी.ए.) क (cid:9)थ ापना 33. अजारा छोर पर अजारा-ब%गईगांव 400 के.वी. डी/सी लाइन के (cid:19)(cid:2)य के सgकट म(cid:25) 63 एम.वी.ए.आर. के लाइन (cid:27)रए\ट र 34. अजारा छोर पर 63 एम.वी.ए.आर. के बस (cid:27)रए\ट र 35. (य ू गोवाहाटी (अजारा) पीजी म(cid:25) अिगया-गुवाहाटी 220 के.वी. डी/सी लाइन के दोन% सgकट के एलआईएलओ 36. िब*नहाट म(cid:25) िसलचर-ब%गईगांव 400 के.वी. डी/सी लाइन के एक सgकट का एलआईएलओ 37. िब*नहाट 400/220 के.वी. सब (cid:9)ट ेशन (2x315 एम.वी.ए.) क (cid:9)थ ापना 38. िसलचर-िब*नहाट लाइन हते ु िब*नहाट म(cid:25) 63 एम.वी.ए.आर. का लाइन (cid:27)रए\ट र 39. िब*नहाट म(cid:25) 63 एम.वी.ए.आर. का बस (cid:27)रए\ट र 40. बीटीपीएस-(एनटीपीसी)-ब%गईगांव सब (cid:9)ट ेशन (पीजी) 400 के.वी. डी/सी लाइन 41. पलाटना-िसलचर 400 के.वी. डी/सी लाइन 42. िसलचर-ब%गईगांव 400 के.वी. डी/सी लाइन 43. पलाटना-सूरजमानी नगर 400 के.वी. डी/सी लाइन (132 के.वी. पर आवेिशत)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 735 तािलका सं. एन.ई.आर.-एएस-03 नाम)प+ िव(cid:9)त ार (100 1.नाम)प-ितनसुिखया 220 के.वी. डी/सी लाइन मेगावाट ) 2.नाम)प-लकवा 132 के.वी. डी/सी लाइन (रा3य ,े9) 3.बोडुबी म(cid:25) नाम)प-ितनसिु खया 220 के.वी. एस/सी लाइन का एलआईएलओ ततततााााििििललललककककाााा सससस..ंं..ंं एएएएनननन....ईईईई....आआआआरररर....----एएएएममममएएएएलललल----00001111 (य ू उम9ू (40 मेगावाट ) (य ू उ“9ू एचईपी-नोब%ग 132 के.वी. डी/सी (रा3य ,े9) ततततााााििििललललककककाााा सससस..ंं..ंं एएएएनननन....ईईईई....आआआआरररर....----एएएएममममजजजजडडेेडडेे ----00001111 तुई(cid:27)रयल एचईपी (2x30 1. तुई(cid:27)रयल-कोलािसब 132 के.वी. एस/सी (33 के.वी. पर (cid:19)चािलत) (मौजूदा) मेगावाट) 2. तुई(cid:27)रयल एचईपी पर िजरीबमे ऐजाल 132 के.वी. एस/सी (क(cid:25)Fीय ,े9) ततततााााििििललललककककाााा सससस..ंं..ंं एएएएनननन....ईईईई....आआआआरररर....----टटटटीीीीआआआआरररर----00001111 पलाटना गैस हते ु एटीएस पलाटना गैस (726.6 मेगावाट) 1. पलाटना-िसलचर 400 के.वी. डी/सी लाइन 2. िसलचर-ब%गईगांव 400 के.वी. डी/सी लाइन ततततााााििििललललककककाााा सससस..ंं..ंं एएएएनननन....ईईईई....आआआआरररर....----टटटटीीीीआआआआरररर----00002222 मोनारचक (105 मेगावाट) 1. मोनारचक-बदरघाट-कुमारघाट-बदरपुर एस.डN@ य ू (cid:9)ट ेशन 132 के.वी. डी/सी लाइन (क(cid:25)Fीय ,े9) 2. मोनारचक-रबी(F नगर 132 के.वी. डी/सी लाइन 3. रबी(F नगर 132/33 के.वी. सब (cid:9)ट ेशन (2x25 एम.वी.ए.) क (cid:9)थ ापना 4. बदरघाट (अगरतला (य ू) 132/33 के.वी. सब (cid:9)ट ेशन (2x25 एम.वी.ए.) क (cid:9)थ ापना पूवy(cid:2)त र ,े9-एस.टी.यू. क (cid:19)णाली सशि(cid:129)करण योजनाए::ं:: ततततााााििििललललककककाााा सससस..ंं..ंं एएएएनननन....ईईईई....आआआआरररर....----एएएएससससएएएएसससस----एएएएआआआआररररपपपपीीीी अ)णाचल (cid:19)दशे म(cid:25) (cid:19)णाली 1. खूपी-सेOप ा डी/सी लाइन पर 132 के.वी. एस/सी सशि(cid:129)करण ((cid:19)थम फेज) 2. सेOप ा-साTल ी डी/सी लाइन पर 132 के.वी. एस/सी 3. साTल ी-नाहरलागुन डी/सी लाइन पर 132 के.वी. एस/सी 4. नाहरलागनु -गे)कामुख डी/सी लाइन पर 132 के.वी. एस/सी 5. गे)कामुख-िलकाबाली डी/सी लाइन पर 132 के.वी. एस/सी 6. िलकाबाली-िनTल ोक डी/सी लाइन पर 132 के.वी. एस/सी 7. िनTल ोक-पासीघाट डी/सी लाइन पर 132 के.वी. एस/सी736 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 8. दवे माली-खो(स ा 132 के.वी. एस/सी लाइन 9. खो(स ा-चांगलांग 132 के.वी. एस/सी लाइन 10.चांगलांग-जयरामपुर 132 के.वी. एस/सी लाइन 11.जयरामपुर-िमयो 132 के.वी. एस/सी लाइन 12.िमयो-नामसाई (पीजी) डी/सी लाइन पर 132 के.वी.एस/सी 13.तेज-ू हलाईपानी डी/सी लाइन पर 132 के.वी. एस/सी 14.नाहरलागनु -बंदरदवे ा डी/सी लाइन पर 132 के.वी.एस/सी 15.सेपा, सागली, नहे ारलागुन,गे)कामुख, िलकाबाल, िनगलोक, पासीघाट, खो(स ा, चांगलांग, जयरामपुर, िमयो, हलाईपानी, बदं रदवे ा म(cid:25) 132/33 के.वी. सब (cid:9)ट ेशन अ)णाचल (cid:19)दशे म(cid:25) (cid:19)णाली 1. पािलन-कोलो(cid:27)रयांग132 के.वी. एस/सी लाइन सशि(cid:129)करण (िPतीय फेज) 2. बसर म(cid:25) जीरो-डापो(cid:27)रजो 132 के.वी. एस/सी का एलआईएलओ 3. रोईग-अनीनी डी/सी लाइन पर 132 के.वी.एस/सी 4. एल%ग-रेDयग डी/सी लाइन पर 132 के.वी.एस/सी 5. एल%ग-Dयग'कय%ग डी/सी लाइन पर 132 के.वी.एस/सी 6. पािलन 132/33 के.वी. सब (cid:9)ट ेशन (7x5 एम.वी.ए. एकल फेज) क (cid:9)थ ापना 7. कोलो(cid:27)रयांग 132/33 के.वी. सब (cid:9)ट ेशन (7x5 एम.वी.ए. एकल फेज) क (cid:9)थ ापना 8. बसर 132/33 के.वी. सब (cid:9)ट ेशन (7x5 एम.वी.ए. एकल फेज) क (cid:9)थ ापना 9. Dयग'कय%ग 132/33 के.वी. सब (cid:9)ट ेशन (7x5 एम.वी.ए. एकल फेज) क (cid:9)थ ापना 10. रो’ग 132/33 के.वी. सब (cid:9)ट ेशन (7x5 एम.वी.ए. एकल फेज) क (cid:9)थ ापना 11. रेDयग 132/33 के.वी. सब (cid:9)ट ेशन (7x5 एम.वी.ए. एकल फेज) क (cid:9)थ ापना 12. अनीनी 132/33 के.वी. सब (cid:9)ट ेशन (4x5 एम.वी.ए. एकल फेज) क (cid:9)थ ापना 13.जीरो 132/33 के.वी. सब (cid:9)ट ेशन (संवध(cid:14)न) (4x8 एम.वी.ए.) 14.डापो(cid:27)रजो 132/33 के.वी. सब (cid:9)ट ेशन (संवध(cid:14)न) (2x15.5 एम.वी.ए.) 15.एल%ग 132/33 के.वी. सब (cid:9)ट ेशन (संवध(cid:14)न) (7x5 एम.वी.ए.) 16.जीरो-पािलन 132 के.वी. एस/सी लाइन ततततााााििििललललककककाााा सससस..ंं..ंं एएएएनननन....ईईईई....आआआआरररर....----एएएएससससएएएएसससस----एएएएएएएएसससस असम म(cid:25) (cid:19)णाली सशि(cid:129)करण 1. रांिगया-अमीनगांव 220 के.वी. डी/सी लाइन ((cid:19)थम फेज) 2. ितनसुिखया-बेिहयाzटग ((य ू िड|ूगढ़) 220 के.वी. डी/सी लाइन 3. जवाहरनगर म(cid:25) समागुड़ी-स)साजय लाइन के एक सgकट 220 के.वी. डी/सी लाइन का एलआईएलओ¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 737 4. कहीलापाड़ा-गुवाहाटी मेिडकल कालेज 132 के.वी. डी/सी लाइन 5. समागुड़ी-जखलबंधा डी/सी लाइन पर 132 के.वी.एस/सी 6. िसबसागर-मोरान डी/सी लाइन पर 132 के.वी.एस/सी 7. )पई-चपखोवा (वाया ढोला 4 'कमी.नदी क (cid:15)ाDसग) डी/सी लाइन पर 132 के.वी.एस/सी 8. लंका-लुमDडग डी/सी लाइन पर 132 के.वी.एस/सी 9. डमे ाजी-िशलापपठार डी/सी लाइन पर 132 के.वी. एस/सी 10.िशलापठार-जोनाई डी/सी लाइन पर 132 के.वी. एस/सी 11. अमीनगांव एवं बेिहयाzटग म(cid:25) 220/33 के.वी. सब (cid:9)ट ेशन 12. जमहानगर म(cid:25) 220/33 के.वी. सब (cid:9)ट ेशन 13.गुवाहाटी मेिडकल कालेज, जखालाबंधा, चापकहोआ, लमु Dडग, िशलापठार, एवं जोनाई म(cid:25) 220/33 के.वी. सब (cid:9)ट ेशन 14.समागुड़ी 220/132 के.वी. सब (cid:9)ट ेशन (3x100 एम.वी.ए.) का संवध(cid:14)न असम म(cid:25) (cid:19)णाली सशि(cid:129)करण 1. बोरनगर म(cid:25) बीपीटीएस-रांिगया 220 के.वी. डी/सी लाइन के एक सgकट का (िPतीय फेज) एलआईएलओ 2. माकुम म(cid:25) कथलगुड़ी-ितनसुिखया 220 के.वी. डी/सी लाइन के एक सgकट का एलआईएलओ 3. बोरनगर-बारपेटा 132 के.वी. डी/सी लाइन 4. पाठशाला म(cid:25) बारनगर-रांिगया 132 के.वी. लाइन का एलआईएलओ 5. टांTल ा म(cid:25) रांिगया-रौता 132 के.वी. लाइन का एलआईएलओ 6. ढे'कयाजूली म(cid:25) रौता-िडपोता 132 के.वी. लाइन के एक सgकट का एलआईएलओ 7. अमीनगांव-हजो 132 के.वी. डी/सी लाइन 8. कुकुरमारा (400/220/132) – िमजा(cid:14) 132 के.वी. डी/सी लाइन 9. कामाZय ा–पलटनबाजार (यू.जी. केिबल) 132 के.वी. एस/सी लाइन 10. जागी रोड-नागांव 132 के.वी. डी/सी लाइन 11. नागांव-Œढग 132 के.वी. एस/सी लाइन 12. बैथालांTस ो म(cid:25) समागुड़ी-लंका 132 के.वी. डी/सी लाइन के एक सgकट का एलआईएलओ 13. सा)पठार म(cid:25) गोलाघाट-बोकाजान 132 के.वी. लाइन का एलआईएलओ 14. टेवक म(cid:25) जोरहट-नजीरा 132 के.वी. लाइन का एलआईएलओ 15. माकुम म(cid:25) ितनसुिखया-मारघे(cid:27)रटा 132 के.वी. डी/सी लाइन के एक सgकट का एलआईएलओ 16. सोनािबल-तेजपुर (य ू 132 के.वी. डी/सी लाइन 17. बोरग%ग म(cid:25) सोनािबल-गोहपुक(cid:14) 132 के.वी. डी/सी लाइन के एक सgकट का एलआईएलओ 18. बीMपु(cid:27)रया म(cid:25) गोहपुर-एन-लखीमपुर 132 के.वी. लाइन का एलआईएलओ 19. हले ाकांडी-करीमगंज डी/सी लाइन पर 132 के.वी. एस/सी738 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 20. अिगया-सनपुरा (मनकचर) डी/सी लाइन पर 132 के.वी. एस/सी बोरनगर 220/132 के.वी.सब (cid:9)ट ेशन (2x100 एम.वी.ए.) क (cid:9)थ ापना 21. माकुम 220/132 के.वी.सब (cid:9)ट ेशन (ितनसुिखया का िव(cid:9)त ार) (2x100 एम.वी.ए.) 22. बारपेटा 132/33 के.वी.सब (cid:9)ट ेशन (2x25 एम.वी.ए.) क (cid:9)थ ापना 23. पाठशाला 132/33 के.वी.सब (cid:9)ट ेशन (2x25 एम.वी.ए.) क (cid:9)थ ापना 24. टांTल ा 132/33 के.वी.सब (cid:9)ट ेशन (2x25 एम.वी.ए.) क (cid:9)थ ापना 25. ढे'कयाजूली 132/33 के.वी.सब (cid:9)ट ेशन (2x25 एम.वी.ए.) क (cid:9)थ ापना 26. हाजो 132/33 के.वी.सब (cid:9)ट ेशन (2x25 एम.वी.ए.) क (cid:9)थ ापना 27. िमजा(cid:14) 132/33 के.वी.सब (cid:9)ट ेशन (2x25 एम.वी.ए.) क (cid:9)थ ापना 28. पलटनबाजार 132/33 के.वी.सब (cid:9)ट ेशन (2x40 एम.वी.ए.) क (cid:9)थ ापना 29. Œढग 132/33 के.वी.सब (cid:9)ट ेशन (2x16 एम.वी.ए.) क (cid:9)थ ापना 30. बैथालांTस ू 132/33 के.वी.सब (cid:9)ट ेशन (2x16 एम.वी.ए.) क (cid:9)थ ापना 31. साHपठार 132/33 के.वी.सब (cid:9)ट ेशन (2x16 एम.वी.ए.) क (cid:9)थ ापना 32. टेवक 132/33 के.वी.सब (cid:9)ट ेशन (2x25 एम.वी.ए.) क (cid:9)थ ापना 33. माकुम 132/33 के.वी.सब (cid:9)ट ेशन (2x25 एम.वी.ए.) क (cid:9)थ ापना 34. तेजपुर (य ू 132/33 के.वी.सब (cid:9)ट ेशन (2x25 एम.वी.ए.) क (cid:9)थ ापना 35. बोरगांव 132/33 के.वी.सब (cid:9)ट ेशन (2x25 एम.वी.ए.) क (cid:9)थ ापना 36. बीहपु(cid:27)रया 132/33 के.वी.सब (cid:9)ट ेशन (2x25 एम.वी.ए.) क (cid:9)थ ापना 37. करीमगंज 132/33 के.वी.सब (cid:9)ट ेशन (2x25 एम.वी.ए.) क (cid:9)थ ापना 38. सनपुरा (मनकचार) 132/33 के.वी.सब (cid:9)ट ेशन (2x16 एम.वी.ए.) क (cid:9)थ ापना 39. नाम)प 132/33 के.वी.सब (cid:9)ट ेशन (संवध(cid:14)न) (2x100 एम.वी.ए.) 40. डॉलीगांव 132/33 के.वी.सब (cid:9)ट ेशन (संवध(cid:14)न) (2x40 एम.वी.ए.) 41. नरे(ग ी 132/33 के.वी.सब (cid:9)ट ेशन (संवध(cid:14)न) (2x40 एम.वी.ए.) 42. समागुड़ी 132/33 के.वी.सब (cid:9)ट ेशन (संवध(cid:14)न) (2x40 एम.वी.ए.) 43. बोकाजन 132/33 के.वी.सब (cid:9)ट ेशन (संवध(cid:14)न) (2x25 एम.वी.ए.) 44. िसबसागर 132/33 के.वी.सब (cid:9)ट ेशन (संवध(cid:14)न) (2x40 एम.वी.ए.) ततततााााििििललललककककाााा सससस..ंं..ंं एएएएनननन....ईईईई....आआआआरररर....----एएएएससससएएएएसससस----एएएएममममआआआआरररर मिणपुर म(cid:25) (cid:19)णाली 1. कैथलमा(ब ी (इ€फ ाल (य ू)-Dनगथांगख%ग 132 के.वी. डी/सी लाइन सशि(cid:129)करण ((cid:19)थम फेज) 2. यैनग"गपो\प ी-यूरे€ब ाम 132 के.वी. के िPतीय सgकट का D(cid:9)[Dगग 3. कैथलमा(ब ी (इ€फ ाल (य ू) म(cid:25) यूरे€ब ाम-यैनग"गपो\ पी 132 के.वी. के दोन% सgकट के एलआईएलओ 4. यैनग"गपो\प ी-क%Tब ा 132 के.वी. के िPतीय सgकट का D(cid:9)[Dगग¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 739 5. काकाDचग-क%Tब ा 132 के.वी. के िPतीय सgकट का D(cid:9)[Dगग 6. काकाDचग-चूराचंदपुर 132 के.वी. के िPतीय सgकट का D(cid:9)[Dगग 7. ितपाईमुख म(cid:25) िजरीबाम-ऐजॉल 132 के.वी. एस/सी लाइन का एलआईएलओ 8. ितपाईमुख 132/33 के.वी. सब (cid:9)ट ेशन (2x12.5 एम.वी.ए. मिणपुर म(cid:25) (cid:19)णाली 1. र(cid:25)गपांग-ताम(cid:25)गलांग 132 के.वी. एस/सी लाइन सशि(cid:129)करण (िPतीय एवं 2. ताम(cid:25)गलांग/कार%ग 132 के.वी. एस/सी लाइन तृतीय फेज) 3. गंफाजोज म(cid:25) इ€फ ाल-कार%ग 132 के.वी. लाइन का एलआईएलओ 4. काकDचग-थाउबाल 132 के.वी. एस/सी लाइन 5. काकDचग-मोरेह 132 के.वी. एस/सी लाइन 6. को(ब ा-थाउबाल 132 के.वी. एस/सी लाइन 7. मारम म(cid:25) कार%ग-कोिहमा 132 के.वी. लाइन का एलआईएलओ 8. ताम(cid:25)गल%ग 132/33 के.वी. सब (cid:9)ट ेशन (1x20 एम.वी.ए.) क (cid:9)थ ापना 9. ग€फ ाजोल 132/33 के.वी. सब (cid:9)ट ेशन (1x20 एम.वी.ए.) क (cid:9)थ ापना 10. थाउबाल 132/33 के.वी. सब (cid:9)ट ेशन (1x20 एम.वी.ए.) क (cid:9)थ ापना 11. मोरेह 132/33 के.वी. सब (cid:9)ट ेशन (1x12.5 एम.वी.ए.) क (cid:9)थ ापना 12. मारम 132/33 के.वी. सब (cid:9)ट ेशन (1x12 एम.वी.ए.) क (cid:9)थ ापना 13. िजबीराम 132/33 के.वी. सब (cid:9)ट ेशन (संवध(cid:14)न) (िPतीय टीएफआर) (1x20 एम.वी.ए.) 14. र(cid:25)गपंग 132/33 के.वी. सब (cid:9)ट ेशन (संवध(cid:14)न) (िPतीय टीएफआर) (1x20 एम.वी.ए.) 15. क%Tब ा 132/33 के.वी. सब (cid:9)ट ेशन (संवध(cid:14)न) (िPतीय टीएफआर) (1x20 एम.वी.ए.) 16. उखHल 132/33 के.वी. सब (cid:9)ट ेशन (संवध(cid:14)न) (िPतीय टीएफआर) (1x20 एम.वी.ए.) 17. Dनगथऊख%ग 132/33 के.वी. सब (cid:9)ट ेशन (12.5 एम.वी.ए. टीआरएफ का अप>ेडेशन) (1x20 एम.वी.ए.) 18. ग€फ ाजोल 132/33 के.वी. सब (cid:9)ट ेशन (संवध(cid:14)न) (िPतीय टीएफआर) (1x20 एम.वी.ए.) 19.थाऊबाल 132/33 के.वी. सब (cid:9)ट ेशन (िPतीय टीएफआर) (1x20 एम.वी.ए.) ततततााााििििललललककककाााा सससस..ंं..ंं एएएएननननईईईईआआआआरररर....----एएएएससससएएएएसससस----एएएएममममजजजजडडेेडडेे िमजोरम म(cid:25) (cid:19)णाली 1. मेलfj;k त (स ू पीजी- मेल(cid:27)रयात (cid:9)ट ेट (#2) (िसहमुई) 132 के.वी. डी/सी सशि(cid:129)करण ((cid:19)थम फेज) लाइन740 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 2. सेरिचप- मेल(cid:27)रयात (cid:9)ट ेट (#1) 132 के.वी. एस/सी लाइन 3. जे€ब ावक-मेल(cid:27)रयात (cid:9)ट ेट पर वे(cid:9)ट फैDलग (#2) 132 के.वी. लाइन का एलआईएलओ 4. वे(cid:9)ट फैDलग-मारपाड़ा 132 के.वी. एस/सी लाइन 5. मेल(cid:27)रयात (cid:9)ट ेट, वे(cid:9)ट फैDलग, ई; लंगडर, मारापाड़ा, लंगसेन लुवंगतलाई म(cid:25) 132/33 के.वी. का सब (cid:9)ट ेशन िमजोरम म(cid:25) (cid:19)णाली 1. मारपाड़ा-लुंगसेन 132 के.वी. एस/सी लाइन वाया थे(ह लम )ट सशि(cid:129)करण (िPतीय फेज) 2. लुंगसेन-चाव(T ट े 132 के.वी. एस/सी लाइन (33 के.वी. पर आवेिशत) 3. चाव(T ट े-एस. बंगटलांग 132 के.वी. एस/सी लाइन (33 के.वी. पर आवेिशत) 4. लव(ग लाई-तुईपंग 132 के.वी. एस/सी लाइन (33 के.वी. पर आवेिशत) ततततााााििििललललककककाााा सससस..ंं..ंं एएएएननननईईईईआआआआरररर....----एएएएससससएएएएसससस----टटटटीीीीआआआआरररर ि9पुरा म(cid:25) (cid:19)णाली 1. सूय(cid:14)मानी नगर-पी.के. बारी 400 के.वी. डी/सी लाइन (आरंभ म(cid:25) 132 के.वी. सशि(cid:129)करण ((cid:19)थम फेज) पर (cid:19)चािलत) 2. पी.के. बारी, धरमनगर, दलु ाव(cid:14) ेहरे ा-(cid:14) पंच>ाम, िZल(cid:27)रयात 132 के.वी. एस/सी लाइन का सशि(cid:129)करण/नवीनीकरण/(cid:27)र-कड\ट zरग 3. अगरतला 79 (cid:27)टला-सूरजमानी नगर 132 के.वी. एस/सी लाइन 4. सूरजमानी नगर-रोिहया 132 के.वी. एस/सी लाइन 5. सूरजमानी नगर-बदरघाट 132 के.वी. डी/सी लाइन 6. मोनू 132 के.वी. लाइन पर पी.के. बारी–अ€ब ासा का एलआईएलओ 7. सूरजमानी नगर-बोधजंग 132 के.वी. डी/सी लाइन 8. सूरजमानी नगर-उदयपुर 132 के.वी. एस/सी लाइन 9. कैलासर-धरमनगर 132 के.वी. डी/सी लाइन 10. रोिखया-राबे(द रनगर 132 के.वी. डी/सी लाइन 11.सूरजमानी नगर (400 के.वी. तक अप>ेड 'कए जाने योTय ) * 132/33 के.वी. सब (cid:9)ट ेशन 12.बोधजंग नगर 132/33 के.वी. सब (cid:9)ट ेशन (25 एम.वी.ए.) 13.उदयपुर 132/33 के.वी. सब (cid:9)ट ेशन (25 एम.वी.ए.) 14.मोनू 132/33 के.वी. सब (cid:9)ट ेशन (15 एम.वी.ए.), 132/1133 के.वी. सब (cid:9)ट ेशन (10 एम.वी.ए.) 15.रबी(द रनगर 132/33 के.वी. सब (cid:9)ट ेशन (25 एम.वी.ए.) ि9पुरा म(cid:25) (cid:19)णाली 1. बोधजंग नगर-िजरािनया 132 के.वी. एस/सी लाइन सशि(cid:129)करण (िPतीय फेज) 2. हजै ामारा म(cid:25) अगरतला-खोवई 132 के.वी. लाइन का एलआईएलओ 3. उदयपुर-बागफा 132 के.वी. डी/सी लाइन 4. बागफा-बेलोिनया 132 के.वी. डी/सी लाइन 5. रबी(द रनगर-बेलोिनया 132 के.वी. डी/सी लाइन¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 741 6. बेलोिनया-सब)म 132 के.वी. डी/सी लाइन (66 के.वी. पर आवेिशत) 7. िजरािनया (2x12.5 एम.वी.ए.) 132/33 के.वी. सब (cid:9)ट ेशन 8. िजरािनया (1x10 एम.वी.ए.) 132/33 के.वी. सब (cid:9)ट ेशन क (cid:9)थ ापना 9. (क) हजै ामारा 132/33 के.वी. सब (cid:9)ट ेशन (2x12.5 एम.वी.ए.) क (cid:9)थ ापना (ख) हजै ामारा 132/11 के.वी. सब (cid:9)ट ेशन (2x10 एम.वी.ए.) क (cid:9)थ ापना 10. (क) बागफा 132/33 के.वी. सब (cid:9)ट ेशन (2x12.5 एम.वी.ए.) क (cid:9)थ ापना (ख) बागफा 132/66 के.वी. सब (cid:9)ट ेशन (1x30 एम.वी.ए.) क (cid:9)थ ापना (ग) बागफा 132/11 के.वी. सब (cid:9)ट ेशन (2x10 एम.वी.ए.) क (cid:9)थ ापना 11.(क) बेलोिनया 132/66 के.वी. सब (cid:9)ट ेशन (1x130 एम.वी.ए.) क (cid:9)थ ापना (ख) बेलोिनया 132/33 के.वी. सब (cid:9)ट ेशन (2x25 एम.वी.ए.) क (cid:9)थ ापना (ग) बेलोिनया 132/11 के.वी. सब (cid:9)ट ेशन (2x10 एम.वी.ए.) क (cid:9)थ ापना 12. उदयपुर 132/66 के.वी. सब (cid:9)ट ेशन (संवध(cid:14)न) (1x30 एम.वी.ए.) ततततााााििििललललककककाााा सससस..ंं..ंं एएएएननननईईईईआआआआरररर....----एएएएससससएएएएसससस----एएएएममममजजजजीीीी मेघालय म(cid:25) (cid:19)णाली 1. नांगलबीबरा-र%गखोम (तूरा) डी/सी लाइन पर 132 के.वी. एस/सी सशि(cid:129)करण ((cid:19)थम फेज) 2. नो(ग पोह 132 के.वी. डी/सी लाइन पर उम•-'करदमकुलाई डी/सी लाइन के एक सgकट का एलआईएलओ 3. मानगैप-नांग(cid:9)ट ोइ(cid:14)न-नंगलबीबरा 132 के.वी. डी/सी लाइन 4. चेरापूंजी-ईशामती 132 के.वी. डी/सी लाइन 5. िमन(cid:15)े 132/33 के.वी. सब (cid:9)ट ेशन (132 के.वी. 2x डी लाइन) पर 132 के.वी. एमएलएचईपी (लेशका)- िZलह(cid:27)रयात डी/सी लाइन के दोन% सgकट के एलआईएलओ 6. 'कD@लग (िब*नहाट)-मानगैप-(य ू िशल%ग 220 के.वी. डी/सी लाइन 7. मे†ईपठार-फूलबारी 32 के.वी. डी/सी लाइन 8. फूलबारी-अ€प ाती 132 के.वी. डी/सी लाइन 9. ईशमती, िमन(cid:15)े, नो(ग पोह, फूलबारी, (य ू िशल%ग म(cid:25) 132/33 के.वी. (2x20 एम.वी.ए.) सब (cid:9)ट ेशन डी 10.(य ू िशल%ग एवं मानगैप (132 के.वी. सब (cid:9)ट ेशन को 220 के.वी. म(cid:25) आप>ेड करने का काय(cid:14) (cid:19)गित पर) म(cid:25) 220/132 के.वी. (2x160 एम.वी.ए.) सब (cid:9)ट ेशन 11.उिमयम, ईपीआईपी-।।, र%गखोम, चेरापूँजी, नो(ग (cid:9)ट ोईन नांगलबीबरा म (cid:25) सब (cid:9)ट ेशन संवध(cid:14)न ततततााााििििललललककककाााा सससस..ंं..ंं एएएएननननईईईईआआआआरररर....----एएएएससससएएएएसससस----एएएएननननजजजजीीीी नागाल"ड म(cid:25) (cid:19)णाली 1. (य ू कोिहमा* म(cid:25) दीमापुर-िमसा 220 के.वी. डी/सी लाइन के एक सgकट का सशि(cid:129)करण ((cid:19)थम फेज) एलआईएलओ 2. मोकोचुंग-तुली 132 के.वी. एस/सी लाइन742 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 3. (य ू कोिहमा 132 के.वी. एस/सी पर कोिहमा-वो\ख ा का एलआईएलओ 4. दीमापुर-जलूक वाया गणेशनगर (33 के.वी. पर आवेिशत) 132 के.वी. एस/सी 5. जलूक -पेरेन (33 के.वी. पर आवेिशत) 132 के.वी. एस/सी 6. (यू कोिहमा-फेक-'क'फरे (132 के.वी. पर आवेिशत) डी/सी लाइन पर 220 के.वी. एस/सी 7. (यू कोिहमा-वो\ख ा-मोकचुंग-मोन (नािगनीमोरा) (132 के.वी. पर आवेिशत) डी/सी लाइन पर 220 के.वी. एस/सी 8. वो\ख ा-जु(ह बे ोटो-मोकोचुंग डी/सी लाइन पर 220 के.वी. एस/सी 9. फुटसेरो 132 के.वी. 2xडी/सी पर कोिहमा-मेलूरी ('क'फरे) 132 के.वी. एस/सी का एलआईएलओ 10.मोकोचुंग-‚ूनस"ग 132 के.वी. एस/सी 11.(य ू कोिहमा म(cid:25) 220/132 के.वी. सब (cid:9)ट ेशन 12.फुटसेरो, फेक, जु(ह बे ोटो एवं vवेनस"ग म(cid:25) 132/33 के.वी. सब (cid:9)ट ेशन ------------------------------------------------------------------------------------------------¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 743 अअअअननननबबुुबबुु धधंंधधंं ----7777....6666 पपपपााााररररेेेेषषषषणणणण ययययोोोोजजजजननननाााा ििििववववववववररररणणणण---- भभभभााााररररतततत मममम (cid:19)(cid:19) (cid:19)(cid:19)ननननववववीीीीननननीीीीककककृृृृतततत ऊऊऊऊजजजजाााा (cid:8)(cid:8) (cid:8)(cid:8)OOOOोोोोतततत ततततााााििििललललककककाााा सससस..ंं..ंं :::: आआआआररररइइइइएएएएसससस----आआआआररररजजजज--ेे--ेे 00001111 राज(cid:9)थ ान म(cid:25) सौर और 1. रामगढ़ (जैसलमेर) म(cid:25) 400केवी डी/सी रामगढ़-भादला लाइन के िलए (य ू पवन िव(cid:17)ुत 400केवी, 1x125 एमवीएआर, बस (cid:27)रए\ट र और 2x50 एमवीएआर लाइन प(cid:27)रयोजना (2650 (cid:27)रए\ट र सिहत 400/220 केवी, 3 X 500 एमवीए और 220/132केवी, मेगावाट) 132/33 केवी के साथ 3x160 एमवीए , 2x40/50 एमवीए पूDलग सब-(cid:9)ट ेशन 2. भादला म(cid:25) 400केवी, 1x125 एमवीएआर बस (cid:27)रए\ट र और 4x50 (सौर -1400 मेगावाट एमवीएआर, भादला अंत के िलए 400केवी लाइन (cid:27)रए\ट र, 400केवी डी/सी पवन-1250 मेगावाट) भादला-बीकानेर लाइन, 400केवी एलआईएलओ जोधपुर-मेरठ सिहत भादला (जोधपुर) म(cid:25) 400/220 केवी, 3 X 315 एमवीए और 220/132केवी, 3x160 एमवीए के साथ 132/33केवी, 2x40/50 एमवीए पूDलग सब (cid:9)ट ेशन जीएसएस 3. (cid:19)(cid:9)त ािवत 400केवी अकाल-जोधपुर ((य )ू डी/सी लाइन, और 1x125 एमवीएआर 400 केवी बस (cid:27)रए\ट र के िलए 400 केवी, 2x50 एमवीएआर शंट (cid:27)रए\ट र (लाइन टाइप) सिहत 400/220 केवी, 1 X 500 एमवीए [ांसफाम(cid:14)र क (cid:9)थ ापना कर 400केवी जीएसएस अकाल का िव(cid:9)त ारण 4. 400केवी जीएसएस जोधपरु ((य )ू का िव(cid:9)त ार (i) 400 केवी डी/सी अकाल-जोधपुर ((य )ू लाइन के िलए 400 केवी जीएसएस जोधपुर ((य )ू पर 2x50 एमवीएआर, 400केवी शंट (cid:27)रए\ट र (लाइन टाइप) (ii) 400 केवी डी/सी राज वे(cid:9)ट एलटीपीएस जोधपुर लाइन के दोन% सgकट% के एलआईएलओ के िलए जोधपुर ((य )ू सgकट पर 400केवी बे 5. 400केवी जीएसएस बारमेर पर िव(cid:9)त ार (i) 400केवी जीएसएस बारमेर म(cid:25) 1x125 एमवीएआर, 400केवी शंट (cid:27)रए\ट र (बस टाइप) (ii) 400केवी डी/सी बारमेर-भीनमल (पीजी) लाइन के िलए 400केवी बे 6. 400केवी जीएसएस बीकानरे पर िव(cid:9)त ार i. बीकानेर लाइन के अंत म(cid:25) 400केवी डी/सी भाडला-बीकानेर लाइन के िलए 400केवी बे और 400केवी डी/सी बीकानेर-सीकर (पीजीसीआईएल) लाइन ii. 400केवी जीएसएस बीकानरे म(cid:25) 1x125 एमवीएआर, 400केवी शंट (cid:27)रए\अ र (बस टाइप) 7. 400केवी इंटरकनेD\टग लाइन(cid:25) :744 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] (i)400 केवी डी/सी रामगढ़(जैसलमेर)-अकसल (जैसलमेर) लाइन( िvवन मूज) (ii) 400 केवी डी/सी रामगढ़-भादला लाइन (िvवन मूज) (iii) 400 केवी डी/सी भादला-बीकानेर लाइन (\व ैद मूज) (iv) 400केवी एस/सी जोधपुर-मेरता लाइन ((cid:27)ट्वन मूज) पर 400/220 केवी पूDलग (cid:9)ट ेशन भादला से एलआईएलओ Oव ाइंट से 400 केवी डी/सी लाइन (v) 400 केवी डी/सी बीकानेर-सीकर (पीजीसीआईएल) लाइन(िvवन मूज) (vi) 400 केवी डी/सी बारमेर-भीनमल (पीजीसीआईएल) लाइन(िvवन मूज) (vii) 400केवी जीएसएस जोधुपर ((य )ू (िvवन मूज) म(cid:25) 400केवी डी/सी राज वे(cid:9)ट -जोधपुर लाइन के दोन% सgकट% का एलआईएलओ (viii) 400केवी डी/सी अकाल-जोधपुर ((य )ू लाइन (\व ैद मूज) 8. बैप और संब- लाइन% पर 220केवी जीएसएस : (i)बैप (जोधपुर िजल)े म(cid:25) 220/132केवी, 2x160 एमवीए और 132/33केवी, 2x40/50 एमवीए जीएसएस (ii) बैप म(cid:25) 220केवी बरDसगसर एलटीपीएस-फलोदी लाइन का एलआईएलओ (iii) 220केवी डी/सी बैप-भादला लाइन 9. कनासर और संब- लाइन% पर 220केवी जीएसएस : (i)कनासर (जोधपुर िजल)े म(cid:25) 220/132केवी, 2x160 एमवीए और 132/33केवी, 2x40/50 एमवीए जीएसएस (ii) 220केवी डी/सी भादला-कनासर लाइन (iii) कनासर म(cid:25) (cid:19)(cid:9)त ािवत 220केवी जीएसएस पर 132केवी पीएस1-पीएस2 लाइन का एलआईएलओ (iv) कनासर म(cid:25) (cid:19)(cid:9)त ािवत 220केवी जीएसएस पर 132केवी पीएस2-पीएस3 लाइन का एलआईएलओ 10. पीएस नं. 2 का स बं - 132 केवी लाइन सिहत 132/33केवी, 2x20/25 एमवीए [ांसफाम(cid:14)र के साथ 132 केवी ि>ड सब(cid:9)ट ेशन के )प म(cid:25) उ(न यन 11.पीएस नं. 3 का 132/33केवी, 2x20/25 एमवीए [ांसफाम(cid:14)र के साथ 132 केवी ि>ड सब(cid:9)ट ेशन के )प म(cid:25) उ(न यन 12.132 केवी लाइन का 132 केवी पीएस नं. 2 जीएसएस , 132 केवी पीएस नं.3 जीएसएस और 132केवी पीएस नं. 4जीएसएस Pारा पीएस नं. 5 स े पीएस नं. 1 म(cid:25) आवेशन 13.पीएस नं. 4 का 132/33केवी, 2x20/25 एमवीए [ांसफाम(cid:14)र के साथ 132 केवी ि>ड सब(cid:9)ट ेशन के )प म(cid:25) उ(न यन¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 745 ततततााााििििललललककककाााा सससस..ंं..ंं :::: आआआआररररइइइइएएएएसससस----जजजजीीीीजजजज--ेे--ेे 00001111 चरंका सोलर पाक(cid:14) म(cid:25) 1. 400/220केवी, 2X315 एमवीए चरंका सब(cid:9)ट ेशन और चरंका सब(cid:9)ट ेशन पर सौर प(cid:27)रयोजना(cid:31) के 400 केवी, 125 एमवीएआर बस (cid:27)रए\ट र सिहत चरंका – संखा(cid:27)र 400केवी िलए पारेषण (cid:19)णाली डी/सी लाइन (एसीएसआर िvवन मूज) (950.5 मेगावाट) 2. 220/66 केवी ,8X100 एमवीए चरंका पूDलग (cid:9)ट ेशन 3. चरंका-जंगराल 220केवी डी/सी लाइन (एआई-59) 4. पूDलग (cid:9)ट ेशन के साथ सोलर पाक(cid:14) के (cid:19)(cid:2)य ेक Oल ाट म(cid:25) सौर प(cid:27)रयोजना(cid:31) के इंटरकने\श न के िलए करीब 66 केवी केबल का 452 'कमी 1सीx630 (cid:9)\ व ेयर िमिम ततततााााििििललललककककाााा सससस..ंं..ंं :::: आआआआररररइइइइएएएएसससस----जजजजीीीीजजजज--ेे--ेे 00002222 गुजरात म(cid:25) वायु 1. जमानवाडा डN@ य ू/एफ सब(cid:9)ट ेशन-वसा(cid:14)ना 220 केवी डी/सी –(एएएसी मूज प(cid:27)रयोजना के िलए कंड\ट र) पारेषण (cid:19)णाली 2. नाखातराना डN@ य ू/एफ सब(cid:9)ट ेशन-वसा(cid:14)ना 220 केवी डी/सी (एएएसी मूज (4500 मेगावाट) कंड\ट र) 3. वां'दया डN@ य ू/एफ सब(cid:9)ट ेशन – हलवाड़ (400 केवी सब(cid:9)ट ेशन) 220 केवी डी/सी लाइन ( जे|ा कंड\ट र) 4. कनमेर डN@ य ू/एफ सब(cid:9)ट ेशन – हलवाड़ (400 केवी SS) 220 केवी डी/सी लाइन (जे|ा कंड\ट र) 5. चो(cid:27)टला डN@ य ू/एफ सब(cid:9)ट ेशन– जसडान 220 केवी डी/सी लाइन (जे|ा कंड\ट र) 6. मालवन डN@ य ू/एफ सब(cid:9)ट ेशन– चोरािनया 220 केवी डी/सी लाइन (जे|ा कंड\ट र) 7. धनक डN@ य ू/एफ सब(cid:9)ट ेशन– भा(cid:27)टया 220 केवी डी/सी लाइन (जे|ा कंड\ट र) 8. भंवड़ - भोिमयावाडर 132 केवी डी/सी लाइन। 9. तेभादा डN@य ू/एफ सब(cid:9)टेशन (य ारा (राजकोट) 220 केवी डी/सी लाइन (एएएसी मूज कंड\ट र) 10.मािलया डN@य ू/एफ सब(cid:9)टेशन – टंकारा 220 केवी डी/सी लाइन (जे|ा कंड\ट र) 11. रोजमल डN@य ू/एफ सब(cid:9)टेशन – अमरेली 220 केवी डी/सी लाइन (एएएसी मूज कंड\ट र) 12. शापुर डN@य ू/एफ सब(cid:9)टेशन – हलवाड (400 केवी सब(cid:9)ट ेशन) 220 केवी डी/सी लाइन (एएएसी मूज कंड\ट र) 13. कोदाधा डN@य ू/एफ सब(cid:9)टेशन – थराड 220 केवी डी/सी लाइन (एएएसी मूज कंड\ट र)746 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 14. पाटन डN@य ू/एफ सब(cid:9)टेशन – राधनपुर 220 केवी डी/सी लाइन (जे|ा कंड\ट र) ततततााााििििललललककककाााा सससस..ंं..ंं :::: आआआआररररइइइइएएएएसससस----जजजजीीीीजजजज--ेे--ेे 00003333 गुजरात म(cid:25) वायु 1. 400/220केवी, 2x315 एमवीए हलवाड़ सब(cid:9)ट ेशन सिहत वरसाना-हलवाड़ प(cid:27)रयोजना के िलए 400केवी डी/सी \व ैद लाइन । पारेषण 2. 220/66 केवी, 100 एमवीए टनकारा सब(cid:9)ट ेशन, 220/132 केवी, सुदढ़ृ ीकरण (4500 200एमवीए भा(cid:27)टया सब(cid:9)ट ेशन, (220/66 केवी, 100एमवीए + मेगावाट) 220/132केवी, 100एमवीए) जासडन सब(cid:9)ट ेशन 3. भा(cid:27)टया-कलावाड़ - कांगािसयाली 220केवी डी/सी लाइन (एएएसी मूज)। 4. मोरबी-टनकारा-चोरािनया 220केवी डी/सी लाइन (एएएसी मूज) । 5. अमरेली-जासडन 220केवी डी/सी लाइन(एएएसी मूज) । 6. वरसाना- भचाउ- राधनपुर 220केवी डी/सी लाइन (एएएसी मूज)। 7. नाखटराना -वरसाना 220केवी डी/सी लाइन (एसीएसआर जे|ा) । 8. भा(cid:27)टया (220केवी)- भा(cid:27)टया(132केवी) 132 केवी डी/सी लाइन(एसीएसआर प"थर) । ततततााााििििललललककककाााा सससस..ंं..ंं :::: आआआआररररईईईईएएएएसससस----टटटटीीीीएएएएनननन----00001111 तिमलनाडु म(cid:25) पवन 1. कनारापuी (टीएन Dवड) - कायाथर 400 केवी, 400 केवी डी/सी िvवन मूज I प(cid:27)रयोजना चरण- लाइन । (मौजूदा) 2. कायाथर- कराइकु†ी 400 केवी डी/सी \व ैद लाइन 3. कराइकुडी - पुगलुर 400 केवी डी/सी \व ैद लाइन (ित)नलवे@ल ी/ 4. कायाथर म(cid:25) 2x315 एमवीए 400/230 केवी आईसीटी और 2x200 एमवीए कायाथर ,े9-3500 400/110केवी आईसीटी सिहत 400/230-110 केवी सब(cid:9)ट ेशन क (cid:9)थ ापना मेगावाट 5. पुगलुर – शोिलनगन@ल ूर (ओ(cid:27)uआमप\ \म ), 400 केवी डी/सी \व ैद लाइन थेनी/ उडुमालपेट ,े9– 6. ित)नलवेली (टीएनईबी) (टीएन Dवड/कानरापuी ) 400/230 केवी सब(cid:9)ट ेशन 2800 मेगावाट) (3x315 एमवीए) 7. ित)नेलवेली (टीएनईबी) - ित)नेलवेली (पीजी) 400केवी डी/सी \व ैद लाइन 8. मरंडई, सायामलाई, वागैकुलम, कुमारापुरम, संकाराDलगापुरम म(cid:25) पांच 230/33 केवी पवन ऊजा(cid:14) सब(cid:9)ट ेशन और एक कनारपuी 400 केवी सब(cid:9)ट ेशन के साथ जुड़ा #आ 230 केवी लाइन के साथ संब- समुगारंगापुरम सब(cid:9)ट ेशन * यह (cid:19)णाली 11व8 योजना म(cid:25) पूण(cid:14) होने के िलए 2007 म(cid:25) योिजत थी। यह (cid:19)णाली अभी भी पूण(cid:14) होनी ह।ै¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 747 ततततााााििििललललककककाााा सससस..ंं..ंं :::: आआआआररररईईईईएएएएसससस----टटटटीीीीएएएएनननन----00002222 तिमलनाडु म(cid:25) पवन 1. थेनी ,े9 म(cid:25) थOप ागुंडु 400/110 केवी (5x200एमवीए) सब(cid:9)ट ेशन II प(cid:27)रयोजना चरण- 2. उडुमालपेट ,े9 म(cid:25) अनैकाडावु 400/230-110 केवी (2x315+ 2x200 एमवीए) सब(cid:9)ट ेशन (ित)नलवे@ल ी/ 3. उडुमालपेट ,े9 म(cid:25) रिसपालयम 400/230-110 सब(cid:9)ट ेशन (2x315+2x200 कायाथर ,े9-2500 एमवीए) मेगावाट थेनी/ 4. अनैकाडावु- रिसपालयम 400केवी डी/सी लाइन उडुमालपेट ,े9– 5. उडुमालपेट 400/220 केवी (पीजीसीआईएल) सब(cid:9)ट ेशन पर एक सgकट 3300 मेगावाट) एलआईएलओ के साथ थOप ागुंडु - अनैकाडावु 400केवी डी/सी 6. रिसपालयम -Dसगारापेट 400केवी 2xडी/सी लाइन 7. वगरै 400/230-110 केवी सब(cid:9)ट ेशन 8. वगरै-रिसपालयम 400 केवी डी/सी लाइन 9. थे(न मपuी 400/230-110 केवी सब(cid:9)ट ेशन 10.थे(न मपuी - कायाथर 400केवी डी/सी लाइन आईएसटीएस और स ल ेम 7 6 5 / 4 0 0 क ेव ी ( प ा व र ि > ड ) स ब (cid:9) ट ेश न प र ए क र ि स प ल य म - ि स ग ा र प ेट 4 0 0 िव(cid:9)त ृत िव(cid:29)व (cid:9)त ता के केवी डी/सी लाइन का एलआईएलओ सा थ अित(cid:27)र\त इंटरकने\श न के िलए (cid:19)णाली ततततााााििििललललककककाााा सससस..ंं..ंं :::: आआआआररररईईईईएएएएसससस----एएएएपपपपीीीी----00001111 आंnपदशे म(cid:25) पवन 1. िह(द पु ुर म(cid:25) 400/220 केवी सब(cid:9)ट ेशन (3x315 एमवीए) प(cid:27)रयोजना (3150 मेगावाट) 2. क%डापुरम म(cid:25) 400/220 केवी सब(cid:9)ट ेशन (4x315 एमवीए) 3. उरावाक%डा म(cid:25) 400/220 केवी सब(cid:9)ट ेशन (4x315 एमवीए) 4. उरावाक%डा -महबूबनगर 400 केवी \व ैद डीसी लाइन 5. उरावाक%डा- Dहदपु ुर 400 केवी डीसी लाइन 6. उरावाक%डा-क%डापुर 400 केवी डीसी लाइन 7. क%डापुर – कुनू(cid:14)ल 400 केवी \व ैद डीसी लाइन 8. Dहदपु ुर (400 केवी) सब(cid:9)ट ेशन -Dहदपु ुर/ गो@ल ापुरम (मौजूदा) 220 केवी डीसी लाइन 9. उवा(cid:14)क%डा (400 केवी) सब(cid:9) टेशन – क@य ाणदगु (cid:14) (मौजूदा) 220 केवी डी/सी लाइन748 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 10.क%डापुर (400 केवी) सब(cid:9)ट ेशन - त'दप9ी(मौजूदा) 220 केवी डी/सी लाइन 11.ज€म ालामाडुगु, पेणुक%डा और पो)मािम@ल ा म(cid:25) 220/132 केवी, 2x100 एमवीए सब(cid:9)ट ेशन 12. ज€म ालामाडुगु, पेणुक%डा और पो)मािम@ल ा 220/1323 केवी सब(cid:9)ट ेशन का मौजूदा 132/33 केवी सब(cid:9)ट ेशन% से कनेि\टिवटी ततततााााििििललललककककाााा सससस;;ंं;;ंं :::: आआआआररररईईईईएएएएसससस----ककककेेेेआआआआरररर----00001111 कना(cid:14)टक म(cid:25) पवन डोनी म(cid:25) मुिनराबाद-दावनिगरी (गुvटुर) 400 केवी एस/सी लाइन का एलआईएलओ प(cid:27)रयोजना (600 मेगावाट)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 749 अअअअननननबबुुबबुु धधंंधधंं 7777....7777 पपपपााााररररेेेेषषषषणणणण ययययोोोोजजजजननननाााा ििििववववववववररररणणणण –––– भभभभटटूूटटूू ाााानननन,,,, बबबबाााागगंंगगंं ललललााााददददशशेेशशेे औऔऔऔरररर ननननपपेेपपेे ाााालललल मममम (cid:19)(cid:19) (cid:19)(cid:19) पपपपााााववववरररर पपपप????ररररययययोोोोजजजजननननाााा ककककेेेे ििििललललएएएए ततततााााििििललललककककाााा सससस..ंं..ंं :::: बबबबीीीीएएएएचचचच----00001111 फुनातसांगच ु (cid:9)ट ेशन -I (1200 1. फुनातसांगच ु I – @ह ामोइDजगखा (भूटान सीमा) 2X 400 केवी मेगावाट) डी/सी लाइन 2. @ह ामोइDजगखा (भूटान सीमा) – अिलपुरPार \व ैद मूज कंड\ट र के साथ 400केवी डी/सी 3. फुनातसांगच-ु I म(cid:25) 220 केवी बोसोqच -ु II-ि(cid:2)सरांग एस/सी लाइन का एलआईएलओ 4. फुनातसांगच ु म(cid:25) 3x105 एमवीए आईसीटी 5. फुनातसांगच ु म(cid:25) 1x80 एमवीएआर बस (cid:27)रए\ट र ततततााााििििललललककककाााा सससस..ंं..ंं :::: बबबबीीीीएएएएचचचच----00002222 फुनातसांगच ु (cid:9)ट ेशन-II (990 फुनातसांगच ु -।। म(cid:25) फुनातसागं चु- I -@ह ामोइDजगखा (भूटान सीमा) मेगावाट) 400 केवी डी/सी लाइन का एलआईएलओ ततततााााििििललललककककाााा सससस..ंं..ंं :::: बबबबीीीीएएएएचचचच----00003333 मांगढेचू (720 मेगावाट) 1. मांगढेचू एचईपी-गोDलग 400केवी 2Xएस/सी लाइन 2. गोDलग-िजTम (cid:25)Dलग 400केवी डी/सी लाइन 3. िजTम ेDलग-अिलपुरPार 400केवी डी/सी लाइन(\व ैद) ततततााााििििललललककककाााा सससस..ंं..ंं :::: बबबबीीीीएएएएचचचच----00004444 भूटान सरOल स के आयात के िलए 1. अिलपुरPार म(cid:25) ±800केवी, 3000मेगावाट कंवट(cid:14)र मा‘ूल के साथ इंिडयन ि>ड सुदढ़ृ ीकरण (य ू 2x315 एमवीए, 400/220केवी एसी और एचवीडीसी सब(cid:9)ट ेशन। 2. आगरा म(cid:25) ±800 केवी एचवीडीसी (cid:9)ट ेशन का 3000 मेगावाट से िव(cid:9)त ार 3. अिलपुरPार म(cid:25) 400/220केवी सिहत समानांतर (cid:19)चालन एचवीडीसी ट*मनल के िलए ±800केवी,6000मेगावाट िव(cid:29)व नाथ च(cid:27)रयाली-आगरा एचवीडीसी बाइपोल का एलआईएलओ 4. अिलपुरPार म(cid:25) ब%गाइगांव-िसिलगुड़ी 400केवी डी/सी \व ैद मूज लाइन का एलआईएलओ 5. @ह ामोइDजघा/ सनु कोश-अिलपुरPार 400केवी डी/सी ((cid:19)थम) \व ैद मूज लाइन (भारतीय भाग)750 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 6. अिलपुरPार म(cid:25) ताला-िसिलगुड़ी 400केवी डी/सी लाइन का एलआईएलओ 7. अिलपुरPार म(cid:25) बीरपारा-सालाकटी 220केवी डी/सी लाइन का एलआईएलओ पपपपााााररररेेेेषषषषणणणण ययययोोोोजजजजननननाााा ििििववववववववररररणणणण –––– भभभभााााररररतततत औऔऔऔरररर बबबबाााागगंंगगंं ललललााााददददशशशशेेेे ििििKKKKडडडड ककककेेेे बबबबीीीीचचचच मममम (cid:19)(cid:19) (cid:19)(cid:19)ससससीीीीममममाााा पपपपाााारररर इइइइंंंंटटटटररररककककनननन\\ेे\\ेे शश शश नननन ततततााााििििललललककककाााा सससस..ंं..ंं :::: बबबबीीीीजजजजीीीी----00001111 दो दशे % के बीच 500मेगावाट तक का भारत का भाग: िव(cid:17)ुत िविनमय कराने के िलए भारत (पावरि>ड Pारा काया(cid:14)(व यन 'कया जाना ह ै ) और बांगलादशे ि>ड के बीच सीमा 1. बहरामपुर (भारत)-भेरामारा (बांगलादशे ) 400केवी डी/सी पार इंटरकने\श न लाइन 2. बहरामपुर म(cid:25) फर\क ा-िजरट 400केवी एस/सी लाइन का एलआईएलओ 3. बहरामपुर म(cid:25) 400केवी ि(cid:9)वचंग (cid:9)ट ेशन क (cid:9)थ ापना बांगलादशे भाग: (बांगालादशे िलिमटेड के पावर ि>ड कंपनी Pारा काया(cid:14)(व यन 'कया जाना ह)ै 1. बहरामपुर (भारत)-भेरामारा (बांगलादशे ) 400केवी डी/सी लाइन 2. भेरामारा म(cid:25) इसुरदी-खुलना दि,ण 230 केवी डी/सी लाइन का एलआईएलओ 3. भेरामारा म(cid:25) 1x500मेगावाट एचवीडीसी बैक-टे-बैक (cid:9)ट ेशन और 230केवी ि(cid:9)वDचग (cid:9)ट ेशन क (cid:9)थ ापना पपपपााााररररेेेेषषषषणणणण ययययोोोोजजजजननननाााा ििििववववववववररररणणणण ––––भभभभााााररररतततत औऔऔऔरररर ननननपपेेपपेे ाााालललल ििििKKKKडडडड ककककेेेे बबबबीीीीचचचच ससससीीीीममममाााा पपपपाााारररर इइइइंंंंटटटटररररककककनननन\\ेे\\ेे शश शश नननन ततततााााििििललललककककाााा सससस..ंं..ंं:::: एएएएननननपपपपीीीी----00001111 दो दशे % के बीच िव(cid:17)ुत िविनमय 400केवी मुजJफरपुर (भारत)- धलकेबर (नेपालl) डी/सी Dलक सहज करान े के िलए भारत और नेपाल ि>ड के बीच सीमा पार (भारत का भाग-सीपीटीसी (जेवी) Pारा 87 'कमी, नेपाल का इंटरकने\श न भाग-39 'कमी) ****************************************¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 751 अ(cid:2)य ा(cid:6)(cid:7)(cid:8)(cid:5) (cid:5) ससससभभंंभभंं ााााििििववववतततत पपपपााााररररेेेेषषषषणणणण ययययोोोोजजजजननननाााा (cid:5) 8888....1111ससससभभंंभभंं ााााििििववववतततत पपपपााााररररेेेेषषषषणणणण ययययोोोोजजजजननननााााएएएए::ंं::ंं संभािवत पारेषण योजना(cid:31) म(cid:25) िन€न िलिखत के िलए योजनागत (cid:19)मुख पारेषण कॅरीडोर शािमल ह " : - िपट हडे के िनकट ((cid:9)थ ानीय कोयले के िलए) तथा तटवत] (cid:9)थ ान% के िनकट (आयाितत कोयले के िलए) िचि—नत थम(cid:14)ल उ(cid:2)प ादन प(cid:27)रयोजनाए,ं - उ(cid:2)त री एवं पूव] ,े9% म(cid:25) नदी बेिसन पर िचि—नत जल िव(cid:17)ुत प(cid:27)रयोजनाएं, - संभािवत पवन तथा सौर ऊजा(cid:14) उ(cid:2)प ादन प(cid:27)रयोजनाए,ं - अ)णाचल (cid:19)दशे (पूवा(cid:14)(cid:2)त र ,े9 म(cid:25)) िचि—नत जल िव(cid:17)ुत प(cid:27)रयोजनाए ं तथा - भूटान, नेपाल, एवं €य ांनमार से उ(cid:2)प ादन प(cid:27)रयोजना(cid:31) स े िव(cid:17)ुत आयात। इन योजना(cid:31) म(cid:25) िचि—नत पारेषण (cid:19)णािलय% को आगामी 5 से 15 वषi म(cid:25) '(cid:15)याि(वत 'कया जा सकता ह।ै इस समयाविध म(cid:25) मांग/उ(cid:2)प ादन प(cid:27)रद(cid:29)ृ य के अनु)प पारेषण योजना(cid:31) का सुदढ़ृ ीकरण 'कया जाएगा तथा उ(cid:2)प ादन प(cid:27)रयोजना(cid:31) क िनधा(cid:14)(cid:27)रत अनसु ूची (काय(cid:14)(cid:15)म) को (cid:24)य ान म(cid:25) रखते #ए इ( ह (cid:25) '(cid:15)याि(वत 'कया जाएगा। 8888....2222 उउउउUUUUचच चच (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााायययय\\ुु\\ुु तत तत ििििववववRRRRततततुुुु पपपपााााररररेेेेषषषषणणणण ककककॉॉॉॉररररीीीीडडडडोोोोरररर ककककाााा ििििववववककककाााासससस 8888....2222....1111 एल.टी.ए. (cid:19)'(cid:15)या के अंतग(cid:14)त सश\त बनाए जाने हते ु िचि—नत अिधकांश उ(cid:2)प ादन योजनाए ं मुZय )प स े ओिडसा, छ(cid:2)त ीसगढ़, िस'tम, झारखंड, म(cid:24)य (cid:19)दशे , तटीय आंn (cid:19)दशे तथा तिमलनाडु रा3य % म(cid:25) ि(cid:9)थत ह।" िजन उ(cid:2)प ादन प(cid:27)रयोजना(cid:31) के पास (cid:9)थ ायी लाभाथ] नह8 थ,े उनक पारेषण (cid:19)णाली क आव(cid:29)य कता(cid:31) का िनधा(cid:14)रण लeय लाभा*थय%/,े9% के आधार पर 'कया गया। ऐसे आवेदक% Pारा दी गई सूचना ((cid:9)थ ािपत ,मता के लगभग 62000 मेगावाट के बराबर) के आधार पर एचवीडीसी को शािमल करते #ए 765 के.वी. ए.सी. तथा 400 के.वी. एस.सी. (cid:19)णािलय% सिहत 11 उqच ,मतायु\त िव(cid:17)ुत पारेषण कॉरीडोर (एचसीपीटीसी) क योजनाए ं बनाई ग’ ह," िज(ह (cid:25) िन€न िलिखत ((((ििििचचचच(cid:17)(cid:17)(cid:17)(cid:17) 8888....00001111)))) म(cid:25) दशा(cid:14)या गया ह ै :752 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] दीघा(cid:8)विध ज,रत- को देखते /ए उपरो1त पारेषण कॉरीडोर क’ योजनाएं बनाई ग6 थ$ तथा संब* उ8प ादन प(cid:10)रयोजना9 के आरंभ (cid:15)कए जाने तक इ=ह # >िमक ,प स े चालू कर (cid:15)दया जाएगा। इन कॉरीडोर के मलू भूत पारेषण घटक- का उ8 पादनवार िववरण अAय ाय 7 म# िविभ=न पारेषण योजना9 के अतं गत (cid:8) (cid:15)दया गया ह।ै कॉरीडोर-वार िववरण िनC निलिखत ह ै :¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 753 8888....2222....2222 उउउउUUUUचच चच (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााायययय\\ुु\\ुु तत तत ििििववववRRRRततुुततुु पपपपााााररररेेेेषषषषणणणण ककककॉॉॉॉररररीीीीडडडडोोोोरररर ----।।।। ((((एएएएचचचचससससीीीीपपपपीीीीटटटटीीीीससससीीीी----।।।।)))) ‘‘‘‘’’’’ओओओओििििडडडडससससाााा मममम (cid:19)(cid:19) (cid:19)(cid:19)आआआआईईईई....पपपपीीीी....पपपपीीीी.... पपपप????ररररययययोोोोजजजजननननाााा<<<< सससस ेे ेेससससबबंंबबंं ++++ पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी’’’’’’’’ संब* उ8 पादन प(cid:10)रयोजनाए:ं ििििवववव(cid:5)(cid:5)(cid:5)(cid:5)ततुुततुु उउउउ(cid:10)(cid:10)(cid:10)(cid:10)पप पप ााााददददकककक////ओओओओपपपपननेेननेे एएएए(cid:17)(cid:17)(cid:17)(cid:17)सस सस ससससेेेे एएएएिििि(cid:19)(cid:19)(cid:19)(cid:19)ललललकककक(cid:22)(cid:22)(cid:22)(cid:22)टटटट (cid:24)(cid:24)(cid:24)(cid:24)थथ थथ ााााििििपपपपतततत (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा ((((ममममगगेेगगेे ााााववववााााटटटट)))) (cid:1)(cid:1)(cid:1)(cid:1)मममम .... (cid:1)ट रलाइट एनज(cid:11) िलिमटेड 1 2400 जीएमआर कमलागं ा एनज(cid:11) िलिमटेड 2 1050 नवभारत पावर (cid:25)ाइवेट िलिमटेड 3 1050 मोनेट पावर कंपनी िलिमटेड 4 1050 (cid:26)जदल इंिडया थम(cid:30)ल पावर िलिमटेड 5 1200 ल(cid:31)को बबंध पावर (cid:25)ाइवेट िलिमटेड 6 2640 इंड बरथ एनज(cid:11) (उ$क ल) िलिमटेड 7 700 ययययोोोोगगगग 11110000000099990000 उउउउUUUUचच चच (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााायययय\\ुु\\ुु तत तत पपपपााााररररेेेेषषषषणणणण ककककॉॉॉॉररररीीीीडडडडोोोोरररर----।।।। ((((एएएएचचचचससससीीीीपपपपीीीीटटटटीीीीससससीीीी----।।।।)))) मममम (cid:19)(cid:19) (cid:19)(cid:19)ििििनननन@@@@नन नन ििििललललििििखखखखतततत पपपपााााररररेेेेषषषषणणणण ययययोोोोजजजजननननााााएएएए ंं ंंशशशशााााििििममममलललल हहहह:(cid:24)(cid:24)(cid:24)(cid:24)- IIII.... ओओओओििििडडडडससससाााा मममम (cid:19)(cid:19) (cid:19)(cid:19) (cid:11)(cid:11)(cid:11)(cid:11)थथथथमममम चचचचररररणणणण कककक.... उउउउ9999पप पप ााााददददनननन पपपप????ररररययययोोोोजजजजननननाााा<<<< हहहहततेेततेे ुु ुुपपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी भभभभाााागगगग----कककक • अंगुल पूDलग (cid:9)ट ेशन – झारसगु ुडा पूDलग (cid:9)ट ेशन 765 के.वी. 2xएस/सी. लाइन • राउरकेला– झारसुगुडा पूDलग (cid:9)ट ेशन पर रायगढ़ 400 के.वी. डी/सी का एलआईएलओ • अंगुल पूDलग (cid:9)ट ेशन पर मेरामुंडली–जयपुर 400 के.वी. एस/सी लाइन का एलआईएलओ • अंगुल पूDलग (cid:9)ट ेशन पर तेलचर के एक सीकेटी–मेरामुंडली 400 के.वी. डी/सी का एलआईएलओ • झारसुगुडा के 765/400 के.वी. पूDलग (cid:9)ट ेशन क (cid:9)थ ापना • अंगुल म(cid:25) 765/400 के.वी. पDू लग (cid:9)ट ेशन क (cid:9)थ ापना IIIIIIII.... ओओओओििििडडडडससससाााा मममम (cid:19)(cid:19) (cid:19)(cid:19) (cid:11)(cid:11)(cid:11)(cid:11)थथथथमममम चचचचररररणणणण कककक.... उउउउ9999पप पप ााााददददनननन पपपप????ररररययययोोोोजजजजननननाााा<<<< हहहहततेेततेे ुु ुुपपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी भभभभाााागगगग----खखखख • झारसुगुडा पुDलग (cid:9)ट ेशन – धम(cid:14)जयगढ़/कोरबा (प.,े.) के िनकट 765 के.वी. डी/सी लाइन • धम(cid:14)जयगढ़/कोरबा के िनकट रांची - प.,े. पूDलग (िसपत के पास) 765 के.वी. एस/सी लाइन का एलआईएलओ • धम(cid:14)जयगढ़/कोरबा के िनकट-जबलपुर पूल 765 के.वी. डी/सी लाइन • जबलपुर पूDलग (cid:9)ट ेशन – जबलुपर 400 के.वी. डी/सी (उqच ,मतायु\त ) लाइन • धम(cid:14)जयगढ़/कोरबा के िनकट उिचत (cid:9)थ ान पर 765 के.वी. सब (cid:9)ट ेशन क (cid:9)थ ापना • जबलपुर म(cid:25) 765/400 के.वी. पूDलग (cid:9)ट ेशन क (cid:9)थ ापना754 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] IIIIIIIIIIII.... ओओओओििििडडडडससससाााा मममम (cid:19)(cid:19) (cid:19)(cid:19) (cid:11)(cid:11)(cid:11)(cid:11)थथथथमममम चचचचररररणणणण कककक.... उउउउ9999पप पप ााााददददनननन पपपप????ररररययययोोोोजजजजननननाााा<<<< हहहहततेेततेे ुु ुुपपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी भभभभाााागगगग----गगगग • जबलपुर पूDलग (cid:9)ट ेशन – बीना 765 के.वी. डी/सी लाइन • बीना-Tव ािलयर 765 के.वी. एस/सी (तीसरी सgकट) लाइन • Tव ािलयर-जयपुर 765 के.वी. एस/सी लाइन • जयपुर - िभवानी 765 के.वी. एस/सी लाइन IIIIVVVV.... ििििननननजजजजीीीी (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ककककेेेे अअअअधधधधीीीीनननन भभभभाााागगगग----घघघघ • 2x1500 एम.वी.ए., 765/400 के.वी. भोपाल पूDलग (cid:9)ट ेशन क (cid:9)थ ापना • जबलपुर पूल – भोपाल –इंदौर 765 के.वी. एस/सी • भोपाल नया सब-(cid:9)ट ेशन – भोपाल (म.(cid:19).) 400 के.वी. डी/सी (उqच ,मतायु\त ) 8888....2222....3333 उउउउUUUUचच चच (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााायययय\\ुु\\ुु तत तत ििििववववRRRRततततुुुु पपपपााााररररेेेेषषषषणणणण ककककॉॉॉॉररररीीीीडडडडोोोोरररर ----।।।।।।।। ((((एएएएचचचचससससीीीीपपपपीीीीटटटटीीीीससससीीीी----।।।।।।।।)))):::: ’’’’झझझझााााररररखखखखडडंंडडंं मममम (cid:19)(cid:19) (cid:19)(cid:19)आआआआईईईई....पपपपीीीी....पपपपीीीी.... पपपप????ररररययययोोोोजजजजननननाााा<<<< सससस ेे ेेससससबबंंबबंं ++++ पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी’’’’’’’’ उ8 पादन प(cid:10)रयोजनाए:ं संब- ििििवववव(cid:5)(cid:5)(cid:5)(cid:5)ततुुततुु उउउउ(cid:10)(cid:10)(cid:10)(cid:10)पप पप ााााददददकककक////ओओओओपपपपननेेननेे एएएए(cid:17)(cid:17)(cid:17)(cid:17)सस सस ससससेेेे एएएएिििि(cid:19)(cid:19)(cid:19)(cid:19)ललललकककक(cid:22)(cid:22)(cid:22)(cid:22)टटटट (cid:24)(cid:24)(cid:24)(cid:24)थथ थथ ााााििििपपपपतततत (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा ((((ममममगगेेगगेे ााााववववााााटटटट)))) (cid:1)(cid:1)(cid:1)(cid:1)मममम .... आधुिनक पावर एवं Dाकृितक संसाधन िलिमटेड 1. 540 ए(cid:21) सार पावर (झारखंड)िलिमटेड 2. 1200 कारपोरेट पावर िलिमटेड चरण – । 3. 540 कारपोरेट पावर िलिमटेड चरण – ।। 4. 540 डE F यबू ीएसईडीसीएल – पिGम बंगाल के राHय (cid:26)ेI 5. 1000 प(cid:10)रयोजना से सरJल स ययययोोोोगगगग 3333888822220000 उqच ,मतायु\त पारेषण कॉरीडोर -।। (एचसीपीटीसी-।।) म(cid:25) िन€न िलिखत पारेषण (cid:19)णाली शािमल ह " : ।।।। झझझझााााररररखखखखंडंडंडंड एएएएवववव ंं ंं पपपपििििDDDDमममम बबबबगगंंगगंं ाााालललल मममम (cid:19)(cid:19) (cid:19)(cid:19) (cid:11)(cid:11)(cid:11)(cid:11)थथथथमममम चचचचररररणणणण कककक.... उउउउ9999पप पप ााााददददनननन पपपप????ररररययययोोोोजजजजननननाााा<<<< हहहहततेेततेे ुु ुु पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी :::: भभभभाााागगगग –––– कककक • रांची–गया 400 के.वी. (\व ाड) लाइन वाया ए(cid:9)स ार/कारपोरेट उ(cid:2)पादन प(cid:27)रयोजना(cid:31) के पास (cid:19)(cid:9)त ािवत पूDलग (cid:9)ट ेशन • रांची (य ू (765/400 के.वी. एस/एस) - धम(cid:14)जयगढ़ 765 के.वी. एस/सी • ए(cid:9)स ार/कारपोरेट उ(cid:2)प ादन प(cid:27)रयोजना(cid:31) (ए(cid:9)स ार तथा कारपोरेट आईपीपी क (cid:19)गित के आधार पर ) के पास 400 के.वी. पूDलग (cid:9)ट ेशन क (cid:9)थ ापना। यह ि(cid:9)वDचग (cid:9)ट ेशन आईसीटी के िबना होगा।¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 755 IIIIIIII झझझझााााररररखखखखंडंडंडंड एएएएवववव ंं ंंपपपपििििDDDDमममम बबबबगगंंगगंं ाााालललल मममम (cid:19)(cid:19) (cid:19)(cid:19) (cid:11)(cid:11)(cid:11)(cid:11)थथथथमममम चचचचररररणणणण कककक.... उउउउ9999पप पप ााााददददनननन पपपप????ररररययययोोोोजजजजननननाााा<<<< हहहहतततेेतेे ुु ुुपपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी:::: भभभभाााागगगग –––– खखखख • वाराणसी तथा कानपरु म #2x1500 एम.वी.ए.,765/400 के.वी. का नया सब (cid:21)ट ेशन • गया – वाराणसी 765 के.वी. एस/सी • वाराणसी – बिलया 765 के.वी. एस/सी लाइन ** • वाराणसी – कानपुर 765 के.वी. डी/सी लाइन • कानपुर – झ(cid:10)टकरा 765 के.वी. एस/सी लाइन • वाराणसी एवं कानपुर म# 765/400 के.वी. के नए सब (cid:21)ट ेशन हते ु 400 के.वी. क’ कनेि1टिवटी • वाराणसी – सारनाथ (यपू ीपीसीएल) 400 के.वी. डी/सी (1व ाड) • वाराणसी म# सासाराम – इलाहाबाद 400 के.वी. लाइन का एलआईएलओ • कानपुर (765/400 के.वी.) – कानपुर (मौजूदा) 400 के.वी. डी/सी (1व ाड) वाराणसी म# ितलैया/गया-बिलया 765 के.वी. के एक सीकेटी के एलआईएलओ के (cid:21)थ ान पर वाराणसी –––– * * बिलया 765 के.वी. एस/सी को तद=त र Dित(cid:21)थ ािपत (cid:15)कया गया। ििििननननजजजजीीीी (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे कककक(cid:31)(cid:31)(cid:31)(cid:31) ससससभभंंभभंं ााााववववननननाााा ककककेेेे अअअअततंंततंं गगगगतत’’तत’’ झझझझााााररररखखखखडडंंडडंं मममम (cid:19)(cid:19) (cid:19)(cid:19) उउउउ3333पप पप ााााददददनननन पपपप(cid:10)(cid:10)(cid:10)(cid:10)ररररययययोोोोजजजजननननाााा==== सससस ेे ेे उउउउ3333तत तत ररररीीीी (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ////पपपपिििि>>>>ममममीीीी (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ककककोोोो ऊऊऊऊजजजजाााा ’’’’ IIIIIIIIIIII अअअअततंंततंं ररररणणणण हहहहततेेततेे ुुुुससससााााझझझझाााा पपपपााााररररेेेेषषषषणणणण (cid:5)(cid:5)(cid:5)(cid:5)णणणणााााललललीीीी ककककाााा ससससशशशशिििि((((ककककररररणणणण • धम(cid:8)जयगढ़ – जबलपुर 765 के.वी. डी/सी (िNतीय लाइन) 8888....2222....4444 उउउउUUUUचच चच (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााायययय\\ुु\\ुु तत तत ििििववववRRRRततततुुुु पपपपााााररररेेेेषषषषणणणण ककककॉॉॉॉररररीीीीडडडडोोोोरररर ----।।।।।।।।।।।। ((((एएएएचचचचससससीीीीपपपपीीीीटटटटीीीीससससीीीी----।।।।।।।।।।।।)))):::: ’’’’ििििसससस(cid:20)(cid:20)(cid:20)(cid:20)JJJJमममम मममम (cid:19)(cid:19) (cid:19)(cid:19)आआआआईईईई....पपपपीीीी....पपपपीीीी.... पपपप????ररररययययोोोोजजजजननननाााा<<<< सससस ेे ेेससससबबंंबबंं ++++ पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी’’’’’’’’ ससससंबंबंबंबCCCC उउउउ3333पप पप ााााददददनननन पपपप(cid:10)(cid:10)(cid:10)(cid:10)ररररययययोोोोजजजजननननााााएएएएं ं ं ं : (cid:7)(cid:7)(cid:7)(cid:7)मममम.... ििििवववव,,,,ततुुततुु उउउउ3333पप पप ााााददददकककक////ओओओओपपपपननननेेेे एएएए4444सस सस ससेेससेे एएएएििििEEEEललललककककFFFFटटटट ))))थथ थथ ााााििििपपपपतततत (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााा ((((ममममगगगगेेेे ााााववववााााटटटट)))) ती(cid:1)त ा ऊजा(cid:30) िलिमटेड पीटीसी 1 //// 1200 ल(cid:31)को एनज(cid:11) (cid:25)ाइवेट िलिमटेड 2 500 डडडडीीीीएएएएएएएएननननएएएएसससस एएएएननननजजजज(cid:30)(cid:30)(cid:30)(cid:30) (cid:31)(cid:31)(cid:31)(cid:31)ााााइइइइववववटटेेटटेे ििििललललििििममममटटटटेेडडेेडड 3 96 जजजजलललल पपपपााााववववरररर ककककााााररररपपपपोोोोररररेेेेशशशशनननन 4 120 मममम!!!!यय यय भभभभााााररररतततत पपपपााााववववरररर ककककााााररररपपपपोोोोररररेेेेशशशशनननन ििििललललििििममममटटटटेेडडेेडड 5 96 गगगगिििितततत इइइइंंंं%%%%ाााा(cid:24)(cid:24)(cid:24)(cid:24)&& && (cid:17)(cid:17)(cid:17)(cid:17)चच चच रररर ििििललललििििममममटटटटेेडडेेडड 6 99 गगगगिििितततत इइइइंंंं%%%%ाााा(cid:24)(cid:24)(cid:24)(cid:24)&& && (cid:17)(cid:17)(cid:17)(cid:17)चच चच रररर भभभभाााा(cid:24)(cid:24)(cid:24)(cid:24)मममम ेे ेेपपपपााााववववरररर (cid:31)(cid:31)(cid:31)(cid:31)ााााइइइइववववटटेेटटेे ििििललललििििममममटटटटेेडडेेडड 7 51 ययययोोोोगगगग 2222111166662222 उqच ,मतायु\त िव(cid:17)तु पारेषण कॉरीडोर -।।। (एचसीपीटीसी-।।।) म(cid:25) िन€न िलिखत पारेषण (cid:19)णाली शािमल ह " : ।।।। पपपपििििDDDDमममम बबबबगगंंगगंं ाााालललल////ििििबबबबहहहहाााारररर ककककेेेे उउउउ9999तततत ररररीीीी (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे मममम (cid:19)(cid:19) (cid:19)(cid:19) (cid:20)(cid:20)(cid:20)(cid:20)ककककशशशशननननगगगगजजंंजजंं ककककेेेे पपपपाााासससस पपपप--ूू--ूू ललललगगगग ////टट टट ेेशशेेशशनननन ककककेेेे ििििववववककककाााासससस हहहहततततेेेे ुु ुु पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी,,,, भभभभाााागगगग –––– कककक • 'कशनगंज के नए पूDलग (cid:9)ट ेशन पर िसिलगुड़ी (मौजूदा) – पु*नया 400 के.वी. डी/सी लाइन (\व ाड) का एलआईएलओ756 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] • 'कशनगंज म(cid:25) उqच ,मता (एचटीएलएस) कंड\ट र सिहत िसिलगुड़ी (मौजूदा)– पु*नया 400 के.वी. डी/सी लाइन (िजस पर (cid:27)र-कंडि\टर ंग क जा रही ह)ै का एलआईएलओ • पिdम बंगाल/िबहार के उ(cid:2)त री िह(cid:9)स े म(cid:25) नए पूDलग (cid:9)ट ेशन पर िसिलगुड़ी– डालखोला 220 के.वी. डी/सी लाइन का एलआईएलओ • रांगपो पूDलग Oव ाइंट तक गंगटोक-मे@ल ी 132 के.वी. एस/सी, लाइन का एलआईएलओ, जहा ँ चुजाचेन-गंगटोक एवं चुजाचेन-मे@ल ी 132 के.वी. एस/सी लाइन% को ग(cid:27)ठत करन े के िलए चुजाचेन-रांगपो 132 के.वी. डी/सी लाइन को जोड़ा जाएगा। • 'कशनगंज म(cid:25) संब- खंड़% (बे) सिहत 2x315 एम.वी.ए., 400 के.वी. का नया सब (cid:9)ट ेशन IIIIIIII ििििसससस(cid:20)(cid:20)(cid:20)(cid:20)JJJJमममम मममम (cid:19)(cid:19) (cid:19)(cid:19) पपपप--ूू--ूू ललललगगगग ससससबबबब ////टट टट ेेेेशशशशनननन ककककेेेे ििििववववककककाााासससस हहहहततेेततेे ुु ुु पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी औऔऔऔरररर पपपपििििDDDDमममम बबबबगगंंगगंं ाााालललल////ििििबबबबहहहहाााारररर ककककेेेे उउउउ9999तत तत ररररीीीी ििििहहहह////सस सस ेे ेेमममम (cid:19)(cid:19) (cid:19)(cid:19)(cid:20)(cid:20)(cid:20)(cid:20)ककककशशशशननननगगगगजजंंजजंं ककककेेेे ननननएएएए पपपप--ूू--ूू ललललगगगग ////टट टट ेेशशेेशशनननन ककककोोोो ििििववववRRRRततुुततुु अअअअततंंततंं ररररणणणण,,,, भभभभाााागगगग----खखखख • (य ू मे@ल ी म(cid:25) ती(cid:9)त ा।।।-'कशनगंज 400 के.वी. डी/सी लाइन (\व ाड) का एलआईएलओ • रांगपो – नई मे@ल ी 220 के.वी. डी/सी लाइन ( दो मूज कंड\ड र सिहत ) • रांगपो म# गगं टोक–रंिगत 132 के.वी. एस/सी लाइन का एलआईएलओ तथा रागं पो सब (cid:21)ट ेशन पर गंगटोक-रांगपो/चुजाचेन एवं मFे ल ी – रांगपो/चुजाचेन 132 के.वी. लाइन- (रागं पो तक गगं टोक–मFे ल ी 132 के.वी. एस/सी लाइन के एलआईएलओ के ज(cid:10)रए भाग–क के अंतग(cid:8)त िनOमत) तक टOमनेशन • (य ू मे@ल ी म(cid:25) ती(cid:9)त ा V-िसिलगुड़ी 400 के.वी. डी/सी लाइन का एलआईएलओ • 'कशनगंज - पटना 400 के.वी. डी/सी (\व ाड) लाइन • रांगपो म(cid:25) 220/132 के.वी., 3x100 एम.वी.ए. गैस इंसुलेटेड सब (cid:9)ट ेशन क (cid:9)थ ापना • नयू मे@ल ी म(cid:25) 10x167 एम.वी.ए., (cid:19)थम चरण, 400/220 के.वी गैस इंसुलेटेड सब (cid:9)ट ेशन क (cid:9)थ ापना 8888....2222....5555 उउउउUUUUचच चच (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााायययय\\ुु\\ुु तत तत ििििववववRRRRततततुुुु पपपपााााररररेेेेषषषषणणणण ककककॉॉॉॉररररीीीीडडडडोोोोरररर ---- IIIIVVVV ((((एएएएचचचचससससीीीीपपपपीीीीटटटटीीीीससससीीीी ---- IIIIVVVV)))):::: ’’’’छछछछ9999तत तत ीीीीससससगगगगढ़ढ़ढ़ढ़ मममम (cid:19)(cid:19) (cid:19)(cid:19) ििििबबबबललललााााससससपपपपररुुररुु ककककाााा@@@@bb bb लल लल \\ेे\\ेे सस सस ककककेेेे पपपपाााासससस एएएएवववव ंं ंं मममम(cid:2)(cid:2)(cid:2)(cid:2)यययय (cid:11)(cid:11)(cid:11)(cid:11)ददददशशशशेेेे मममम (cid:19)(cid:19) (cid:19)(cid:19) आआआआईईईई....पपपपीीीी....पपपपीीीी.... पपपप????ररररययययोोोोजजजजननननाााा<<<< सससस ेेेे ससससबबंंबबंं ++++ पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी’’’’’’’’ ससससंबंबंबंबCCCC उउउउ3333पप पप ााााददददनननन पपपप(cid:10)(cid:10)(cid:10)(cid:10)ररररययययोोोोजजजजननननााााएएएएं ं ं ं : (cid:7)(cid:7)(cid:7)(cid:7)मममम.... ििििवववव,,,,ततुुततुु उउउउ3333पप पप ााााददददकककक////ओओओओपपपपननननेेेे एएएए4444सस सस ससेेससेे एएएएििििEEEEललललककककFFFFटटटट ))))थथ थथ ााााििििपपपपतततत (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााा ((((ममममगगगगेेेे ााााववववााााटटटट)))) छछछछ(cid:10)(cid:10)(cid:10)(cid:10)तत तत ीीीीससससगगगगढ़ढ़ढ़ढ़ आआआआईईईई....पपपपीीीी....पपपपीीीी.... मा&ित ’ल ीन कोल 1X300 मगे ावाट 1. ( ) 300 धी& पावर जने 3x350 मेगावाट 2. ( ) 1050 छ$त ीसगढ़ (cid:1)ट ेट पावर +े(cid:26)डग कं. िलिमटेड 3. उउउउपपपप----ययययोोोोगगगग 1350 मममम!!!!यय यय (cid:31)(cid:31)(cid:31)(cid:31)ददददशशेेशशेे आआआआईईईई....पपपपीीीी....पपपपीीीी.... जय (cid:25)काश पावर वे-च स(cid:30) िलिमटेड 2x660 मेगावाट 4. ( ) 1320¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 757 आयन(cid:30) एम.पी. पावर जने रेशन (cid:25)ाइवेट िलिमटेड 5. (2x600 1200 मेगावाट ) बीना पावर स/ल ाई कंपनी िलिमटेड (2x250 मेगावाट 6. ) 500 उउउउपपपप----ययययोोोोगगगग 3020 ययययोोोोगगगग 4444333377770000 उqच ,मतायु\त िव(cid:17)तु पारेषण कॉरीडोर - IV (एचसीपीटीसी- IV) म(cid:25) िन€न िलिखत पारेषण (cid:19)णाली शािमल ह " : • इइइइंंंंददददौौौौरररर – बबबबडडडडोोोोददददरररराााा 765 के.वी एस/सी • वडोदरा – िपराना 400 के.वी. डी/सी (\व ाड) • वडोदरा म# 765/400 ककककेेेे....ववववीीीी....,,,, 2x1500 एएएएमममम....ववववीीीी....एएएए.... कककक(cid:31)(cid:31)(cid:31)(cid:31) ))))थथथथ ाााापपपपननननाााा 8888....2222....6666 उउउउUUUUचच चच (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााायययय\\ुु\\ुु तत तत ििििववववRRRRततततुुुु पपपपााााररररेेेेषषषषणणणण ककककॉॉॉॉररररीीीीडडडडोोोोरररर ---- VVVV ((((एएएएचचचचससससीीीीपपपपीीीीटटटटीीीीससससीीीी ---- VVVV)))):::: ’’’’छछछछ9999तत तत ीीीीससससगगगगढ़ढ़ढ़ढ़ आआआआईईईई....पपपपीीीी....पपपपीीीी.... पपपप????ररररययययोोोोजजजजननननाााा<<<< सससस ेे ेेससससबबंंबबंं ++++ पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी’’’’’’’’ ससससंबंबंबंबCCCC उउउउ3333पप पप ााााददददनननन पपपप(cid:10)(cid:10)(cid:10)(cid:10)ररररययययोोोोजजजजननननााााएएएएं ं ं ं : (cid:7)(cid:7)(cid:7)(cid:7)मममम.... ििििवववव,,,,ततुुततुु उउउउ3333पप पप ााााददददकककक////ओओओओपपपपननननेेेे एएएए4444सस सस ससेेससेे एएएएििििEEEEललललककककFFFFटटटट ))))थथ थथ ााााििििपपपपतततत (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााा ((((ममममगगगगेेेे ााााववववााााटटटट)))) ररररााााययययगगगगढ़ढ़ढ़ढ़ ((((ककककोोोोटटटटरररराााा)))) ककककाााा////(cid:19)(cid:19) (cid:19)(cid:19) लललल (cid:17)(cid:17)ेे(cid:17)(cid:17)ेे सस सस आर.के.एम. पावरजेन िलिमटेड 1 (4x360) 1440 अथेना छ$त ीसगढ़ पावर िलिमटेड 2 (2x600) 1200 एस.के.एस. पावरजने िलिमटेड 3 (4x360) 1200 कोबरा वे(cid:1)ट पावर कंपनी िलिमटेड 4 (1x600) 600 डी.बी. पावर िलिमटेड 5 (2x600) 1200 वीजा पावर िलिमटेड 6 1200 उउउउपपपप –––– ययययोोोोगगगग 6666888844440000 ररररााााययययगगगगढ़ढ़ढ़ढ़ ((((ततततममममननननरररर)))) ककककाााा////(cid:19)(cid:19) (cid:19)(cid:19) लल लल (cid:17)(cid:17)ेे(cid:17)(cid:17)ेे सससस (cid:26)जदल पावर िलिमटेड ( 1 4x600) 2400 (cid:26)जदल पावर िलिमटेड (ड1गाम2आ सीपीपी से 225 मेगावाट 2 + 400 मौजुदा तमनर टीपीएस से मेगावाट) 175 टी.आर.एन. एनज(cid:11) (cid:25)ाइवेट िलिमटेड 3 (2x300) 600 उउउउपपपप –––– ययययोोोोगगगग 3333444400000000 जजजजजजजजंंंं गगगगीीीीरररर –––– चचचच////पप पप ाााा ककककाााा////(cid:19)(cid:19) (cid:19)(cid:19) लललल (cid:17)(cid:17)ेे(cid:17)(cid:17)ेे सस सस के.एस.के. महानदी पावर कंपनी िलिमटेड 1 (6x600) 3600 बा3क ो 2 (4x300) 1200758 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] वंदना िव4तु िलिमटेड 3 (2x135+1x270) 540 ल(cid:31)को अमरकंटक पावर (cid:25)ाइवेट िलिमटेड 4 (2x660) 1320 उउउउपपपप –––– ययययोोोोगगगग 6666666666660000 ररररााााययययपपपपररररुुुु ककककाााा////(cid:19)(cid:19) (cid:19)(cid:19) लल लल (cid:17)(cid:17)ेे(cid:17)(cid:17)ेे सससस जी.एम.आर. छ$त ीसगढ़ एनज(cid:11) (cid:25)ाइवेट िलिमटेड 1 1370 छ$त ीसगढ़ (cid:1)ट ेट पावर +(cid:26)डग कंपनी िलिमटेड 1 ययययोोोोगगगग 11118888222277770000 उउउउUUUUचच चच (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााायययय\\ुु\\ुु तत तत ििििववववRRRRततततुुुु पपपपााााररररेेेेषषषषणणणण ककककॉॉॉॉररररीीीीडडडडोोोोरररर ---- VVVV ((((एएएएचचचचससससीीीीपपपपीीीीटटटटीीीीससससीीीी---- VVVV)))) मममम (cid:19)(cid:19) (cid:19)(cid:19)ििििनननन@@@@नन नन ििििललललििििखखखखतततत पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी शशशशााााििििममममलललल हहहह:(cid:24)(cid:24)(cid:24)(cid:24) ।।।। पपपपााााववववररररििििKKKKडडडड ccccाााारररराााा (cid:20)(cid:20)(cid:20)(cid:20)(cid:9)(cid:9)(cid:9)(cid:9)ययययाााािििि1111ववववतततत कककक.... जजजजााााननननीीीी ववववााााललललीीीी ससससााााझझझझाााा ििििववववRRRRततुुततुु पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी:::: • रायगढ़ पूDलग (cid:9)ट ेशन (कोटरा के पास) – रायगढ़ पूDलग (cid:9) टेशन 765 के.वी. डी/सी लाइन • च€प ा पूDलग (cid:9)ट ेशन– धम(cid:14)जयगढ़ पूDलग (cid:9)ट ेशन 765 के.वी. एस/सी लाइन • च€प ा पूDलग (cid:9)ट ेशन– रायगढ़ पूDलग (cid:9)ट ेशन 765 के.वी. डी/सी लाइन • रायगढ़ पूDलग (cid:9)ट ेशन (कोटरा के पास) – च€प ा पूDलग (cid:9)ट ेशन 765 के.वी. एस/सी लाइन • रायगढ़ पूDलग (cid:9)ट ेशन (तमनर के पास) – रायगढ़ पूDलग (cid:9)ट ेशन (कोटरा के पास) 765 के.वी. डी/सी लाइन • रायगढ़ पूDलग (cid:9) टेशन (कोटरा के पास) – रायगढ़ (पी.जी.) 400 के.वी. डी/सी (बाद क तारीख को आरंभ क गई) लाइन • रायगढ़ पूDलग (cid:9)ट ेशन– रायगढ़ (पी.जी.) 400 के.वी. डी/सी (बाद क तारीख को आरंभ क जाएगी) लाइन • रायपुर पूDलग (cid:9)ट ेशन – वधा(cid:14) 765 के.वी. 2xडी/सी लाइन • वधा(cid:14) – औरंगाबाद (पी.जी.) 765 के.वी. 2xडी/सी लाइन • औरंगाबाद (पी.जी.)-पाडघे 765 के.वी. 2xडी/सी लाइन • औरंगाबाद (पी.जी.) – बोइसर 400 के.वी. डी/सी (\व ाड) लाइन • पडघे (पी.जी.)- पडघे (एमएसटीईसीएल) 400 के.वी. डी/सी (\व ाड ) लाइन • रायगढ़ पूDलग (cid:9)ट ेशन (कोटरा के िनकट)-धुले (पी.जी.) लाइन के बीच ±600 के.वी., 4000 मेगावाट एचवीडीसी बाइपोल • वडोदरा – असोज (गेटको) 400 के.वी. डी/सी (\व ाड) लाइन • च€प ा पूDलग (cid:9)ट ेशन – कु),े9 (उ.,े.) के बीच ±800 के.वी., 3000 मेगावाट एचवीडीसी बाइपोल, िजसे बाद म(cid:25) 6000 मेगावाट तक अप>ेड 'कए जाने का (cid:19)ावधान ह ै • धुले (पी.जी.) – धुले (नया) 400 के.वी. डी/सी (\व ाड) लाइन • धुले (पी.जी.) – मालेगांव (एमएसईटीसीएल) 400 के.वी. डी/सी (\व ाड) लाइन • धुले (पी.जी.) – नािसक (एमएसईटीसीएल) 400 के.वी. डी/सी (\व ाड) लाइन • धुले (पी.जी.) म(cid:25) 400/220 के.वी. 2x315 एम.वी.ए. सब (cid:9)ट ेशन क (cid:9)थ ापना • 765/400 के.वी. 4x1500 एम.वी.ए. रायगढ़ पूDलग (cid:9)ट ेशन (कोटरा के िनकट) क (cid:9)थ ापना • 765/400 के.वी. 3x1500 एम.वी.ए. रायगढ़ पूDलग (cid:9)ट ेशन (तमनर के िनकट) क (cid:9)थ ापना¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 759 • 765/400 के.वी. 6x1500 एम.वी.ए. च€प ा पूDलग (cid:9)ट ेशन क (cid:9)थ ापना • 765/400 के.वी. 1x1500 एम.वी.ए. रायगढ़ पूDलग (cid:9)ट ेशन क (cid:9)थ ापना • रायगढ़ पूDलग (cid:9)ट ेशन (कोटरा के िनकट) तथा धुले (पी.जी.) म(cid:25) (cid:15)मश: एक-एक 4000 मेगावाट 600 के.वी. एचवीडीसी बाइपोल ट*मनल क (cid:9)थ ापना • रायगढ़ पूDलग (cid:9)ट ेशन (कोटरा के िनकट) तथा धुले (पी.जी.) म(cid:25) (cid:15)मश: एक-एक 4000 मेगावाट 600 के.वी. एचवीडीसी बाइपोल ट*मनल क (cid:9)थ ापना • रायगढ़ पूDलग (cid:9)ट ेशन (कोटरा के िनकट) तथा धुले (पी.जी.) म(cid:25) (cid:15)मश: एक-एक 4000 मेगावाट 600 के.वी. एचवीडीसी बाइपोल ट*मनल क (cid:9)थ ापना • च€प ा पूDलग (cid:9)ट ेशन और कु),े9 (उ.,े.) म(cid:25) (cid:15)मश: 3000 मेगावाट + 8000 के.वी. बाइपोल ट*मनल क (cid:9)थ ापना। (बाद म(cid:25) इन ट*मनल को अप>ेड 'कए जाने का (cid:19)ावधान है) • 765/400 के.वी. 2x1500 एम.वी.ए. पेडघे (पीजी) जीआईएस सब (cid:9)ट ेशन क (cid:9)थ ापना • 765/400 के.वी. 2x1500 एम.वी.ए. पेडघे (पीजी) औरंगाबाद सब (cid:9)ट ेशन क (cid:9)थ ापना उउउउ9999तत तत ररररीीीी (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ककककाााा ससससशशशशििििddddककककररररणणणण • कु),े9 (उ.,े.)–जालंधर 400 के.वी. डी/सी (\व ाड) एक सीकेटी वाया 440/220 के.वी. नाकोदर सब (cid:9)ट ेशन • कु),े9 म(cid:25) अNद @ु ल ापुर-सोनपे त 400 के.वी. डी/सी ((cid:27)[पल) का एलआईएलओ • कु),े9 म(cid:25) 400/220 के.वी. 2x500 एम.वी.ए. सब (cid:9)ट ेशन क (cid:9)थ ापना IIIIIIII टटटटैै??ैै??ररररफफफफ आआआआधधधधाााा????ररररतततत (cid:11)(cid:11)(cid:11)(cid:11)ििििततततययययोोोोगगगगीीीी बबबबोोोोललललीीीी ककककेेेे अअअअततंंततंं गगगगतत(cid:8)(cid:8)तत(cid:8)(cid:8) ससससााााझझझझाााा पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ककककाााा ससससशशशशििििddddककककररररणणणण • औरंगाबाद (पी.जी.) – धुले (नया ) 765 के.वी. एस/सी लाइन • धुले (नया) – वडोदरा 765 के.वी. एस/सी लाइन • धुले (नया) – धुले (एमएसईटीसीएल) 400 के.वी. डी/सी \व ाड लाइन • 765/400 के.वी., 2x1500 एम.वी.ए. धुले (नया) सब (cid:9)ट ेशन क (cid:9)थ ापना 8888....2222....7777 उउउउUUUUचच चच (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााायययय\\ुु\\ुु तत तत ििििववववRRRRततततुुुु पपपपााााररररेेेेषषषषणणणण ककककॉॉॉॉररररीीीीडडडडोोोोरररर ---- VVVV।।।। ((((एएएएचचचचससससीीीीपपपपीीीीटटटटीीीीससससीीीी ---- VVVV।।।।)))):::: ’’’’’’’’आआआआIIंंIIंं (cid:11)(cid:11)(cid:11)(cid:11)ददददशशशशेेेे ककककेेेे ककककृृृृPPPPणण णण ाााापपपपततततननननमममम (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे मममम (cid:19)(cid:19) (cid:19)(cid:19)आआआआईईईई....पपपपीीीी....पपपपीीीी.... पपपप????ररररययययोोोोजजजजननननाााा<<<< सससस ेे ेेससससबबंंबबंं ++++ पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी’’’’’’’’ ससससंबंबंबंबCCCC उउउउ3333पप पप ााााददददनननन पपपप(cid:10)(cid:10)(cid:10)(cid:10)ररररययययोोोोजजजजननननााााएएएए:ंंंं (cid:9)(cid:9)(cid:9)(cid:9)मममम.... ििििववववRRRRततुुततुु उउउउ9999पप पप ााााददददकककक////ओओओओपपपपननेेननेे एएएए\\\\सस सस ससेेससेे एएएएििििbbbbललललकककक(cid:24)(cid:24)(cid:24)(cid:24)टटटट ////थथ थथ ााााििििपपपपतततत (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााा ((((ममममगगेेगगेे ााााववववााााटटटट)))) 1 िस€ह ापुरी एनज] (cid:19)ाइवेट िलिमटेड 600 2 मीना,ी एनज] (cid:19)ाइवेट िलिमटेड 600 3 थम(cid:14)ल पावरटेक कारपोरेशन इंिडया िलिमटेड 1320 4 मीना,ी एनज] (cid:19)ाइवेट िलिमटेड 400 5 एनसीसी पावर (cid:19)ोजे\v स िलिमटेड 1320 ययययोोोोगगगग 4444222244440000 उqच ,मतायु\त िव(cid:17)तु पारेषण कॉरीडोर - VI (एचसीपीटीसी- VI) म(cid:25) िन€न िलिखत पारेषण (cid:19)णाली शािमल ह:"760 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] • िस€ह ापुरी-ने@ल ूर 400 के.वी. डी/सी \व ाड लाइन के एलआईएलओ Pारा ने@ल ूर म (cid:25) 765/400 के.वी.,,,, 2x1500 एम.वी.ए. पूDलग (cid:9)ट ेशन क (cid:9)थ ापना • ने@ल ूर पूDलग (cid:9)ट ेशन-करनूल 765 के.वी. डी/सी लाइन • करनूल –––– रायचरू िPतीय 765 के.वी. एस/सी लाइन • ने@ल ूर पूDलग (cid:9)ट ेशन, करनूल एवं रायचूर के(F % पर संबं- 765 के.वी. एवं 400 के.वी. खंड (बे) 8888....2222....8888 उउउउUUUUचच चच (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााायययय\\ुु\\ुु तत तत ििििववववRRRRततततुुुु पपपपााााररररेेेेषषषषणणणण ककककॉॉॉॉररररीीीीडडडडोोोोरररर ---- VVVV।।।।।।।। ((((एएएएचचचचससससीीीीपपपपीीीीटटटटीीीीससससीीीी ---- VVVV।।।।।।।।)))):::: ’’’’’’’’ततततििििममममललललननननााााडडडडुुुु ककककेेेे ततततततूूततूू ीीीीककककोोोोररररनननन (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)(cid:17)(cid:17)ेेेे मममम (cid:19)(cid:19) (cid:19)(cid:19)आआआआईईईई....पपपपीीीी....पपपपीीीी.... पपपप????ररररययययोोोोजजजजननननाााा<<<< सससस ेे ेेससससबबंंबबंं ++++ पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी’’’’’’’’ ससससंबंबंबंबCCCC उउउउ3333पप पप ााााददददनननन पपपप(cid:10)(cid:10)(cid:10)(cid:10)ररररययययोोोोजजजजननननााााएएएएं ं ं ं : (cid:9)(cid:9)(cid:9)(cid:9)मममम.... ििििववववRRRRततुुततुु उउउउ9999पप पप ााााददददकककक////ओओओओपपपपननेेननेे एएएए\\\\सस सस ससेेससेे एएएएििििbbbbललललकककक(cid:24)(cid:24)(cid:24)(cid:24)टटटट ////थथ थथ ााााििििपपपपतततत (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााा ((((ममममगगेेगगेे ााााववववााााटटटट)))) 1 को(cid:9)ट ल एनरजने (cid:19)ाइवेट िलिमटेड 1200 2 इंड-बरथ पावर (मFास) िलिमटेड 1320 ययययोोोोगगगग 2222555522220000 उउउउUUUUचच चच (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााायययय\\ुु\\ुु तत तत ििििववववRRRRततततुुुु पपपपााााररररेेेेषषषषणणणण ककककॉॉॉॉररररीीीीडडडडोोोोरररर ---- VVVVIIIIIIII ((((एएएएचचचचससससीीीीपपपपीीीीटटटटीीीीससससीीीी---- VVVVIIIIIIII)))) मममम (cid:19)(cid:19) (cid:19)(cid:19)ििििनननन@@@@नन नन ििििललललििििखखखखतततत पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी शशशशााााििििममममलललल हहहह (cid:24)(cid:24) (cid:24)(cid:24) :::: • तूतीकोरन तथा सलेम (आरंभ म(cid:25) 400 के.वी. पर आवेिशत) म(cid:25) 765 के.वी. पूDलग (cid:9)ट ेशन क (cid:9)थ ापना • तूतीकोरन पूDलग (cid:9)ट ेशन पर तूतीकारेन संयु\त उप(cid:15)म –––– मदरु ै 400 के.वी. डी/सी (\व ाड) लाइन के दोन% सgकट% का एलआईएलओ • तूतीकोरन पूDलग (cid:9)ट ेशन - सलेम पूDलग (cid:9)ट ेशन 765 के.वी. डी/सी लाइन, आरंभ म(cid:25) 400 के.वी. पर आवेिशत • 400 के.वी. डी/सी (\व ाड) लाइन Pारा सलेम पूDलग (cid:9)ट ेशन का मौजूदा सलेम 400/230 के.वी. सब (cid:9)ट ेशन से अंत:संयोजन • सलेम पूDलग (cid:9)ट ेशन –––– मधुिगरी पूDलग (cid:9)ट ेशन 765 के.वी. एस/सी, आरंभ म(cid:25) 400 के.वी. पर आवेिशत 8888....2222....9999 उउउउUUUUचच चच (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााायययय\\ुु\\ुु तत तत ििििववववRRRRततततुुुु पपपपााााररररेेेेषषषषणणणण ककककॉॉॉॉररररीीीीडडडडोोोोरररर ---- VVVV।।।।।।।।।।।। ((((एएएएचचचचससससीीीीपपपपीीीीटटटटीीीीससससीीीी ---- VVVV।।।।।।।।।।।।)))):::: ’’’’’’’’आआआआIIंंIIंं (cid:11)(cid:11)(cid:11)(cid:11)ददददशशशशेेेे ककककेेेे ggggीीीीककककााााककककुुुुललललमममम (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे मममम (cid:19)(cid:19) (cid:19)(cid:19)आआआआईईईई....पपपपीीीी....पपपपीीीी.... पपपप????ररररययययोोोोजजजजननननाााा<<<< सससस ेे ेेससससबबंंबबंं ++++ पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी’’’’’’’’ ससससबबंंबबंं 1111 पपपपााााररररेेेेषषषषणणणण पपपप4444ररररययययोोोोजजजजननननााााएएएएं ं ं ं : (cid:9)(cid:9)(cid:9)(cid:9)मममम.... ििििववववRRRRततुुततुु उउउउ9999पप पप ााााददददकककक////ओओओओपपपपननेेननेे एएएए\\\\सस सस ससेेससेे एएएएििििbbbbललललकककक(cid:24)(cid:24)(cid:24)(cid:24)टटटट ////थथ थथ ााााििििपपपपतततत (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााा ((((ममममगगेेगगेे ााााववववााााटटटट)))) 1 ई(cid:9)ट को(cid:9)ट एनज] (cid:19)ाइवेट िलिमटेड 1320 ययययोोोोगगगग 1111333322220000¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 761 उउउउUUUUचच चच (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााायययय\\ुु\\ुु तत तत ििििववववRRRRततततुुुु पपपपााााररररेेेेषषषषणणणण ककककॉॉॉॉररररीीीीडडडडोोोोरररर ---- VVVVIIIIIIIIIIII ((((एएएएचचचचससससीीीीपपपपीीीीटटटटीीीीससससीीीी---- VVVVIIIIIIIIIIII)))) मममम (cid:19)(cid:19) (cid:19)(cid:19)ििििनननन@@@@नन नन ििििललललििििखखखखतततत पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी शशशशााााििििममममलललल हहहह (cid:24)(cid:24) (cid:24)(cid:24) :::: • lीकाकुलम म(cid:25) 2x1500 एम.वी.ए.765/400 के.वी. पूDलग (cid:9)ट ेशन क (cid:9)थ ापना • अंगुल म(cid:25) 1x1500 एम.वी.ए., 765/400 के.वी. आईसीटी का (cid:19)ावधान • lीकाकुलम पूDलग (cid:9)ट ेशन - अंगुल 765 के.वी. डी/सी ( आरंभ म(cid:25) 400 के.वी. पर आवेिशत) • अंगुल–झारसुगुडा–धम(cid:14)जयगढ़ 765 के.वी. डी/सी लाइन • lीकाकुलम एवं अंगुल सब (cid:9)ट ेशन% पर संब- 400 के.वी. के खंड (बे) • अंगुल, झारसुगुडा एवं धम(cid:14)जयगढ़ सब (cid:9)ट ेशन% पर संब- 765 के.वी. के खंड (बे) 8888....2222....11110000 उउउउUUUUचच चच (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााायययय\\ुु\\ुु तत तत ििििववववRRRRततततुुुु पपपपााााररररेेेेषषषषणणणण ककककॉॉॉॉररररीीीीडडडडोोोोरररर ---- IIIIXXXX ((((एएएएचचचचससससीीीीपपपपीीीीटटटटीीीीससससीीीी ---- IIIIXXXX)))):::: ’’’’’’’’ददददिििि(cid:15)(cid:15)(cid:15)(cid:15)णणणणीीीी (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे सससस ेे ेे अअअअ1111यय यय (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे '''' मममम (cid:19)(cid:19) (cid:19)(cid:19) ििििववववRRRRततुुततुु अअअअततंंततंं ररररणणणण ककककेेेे ििििललललएएएए आआआआईईईई....पपपपीीीी....पपपपीीीी.... पपपप????ररररययययोोोोजजजजननननाााा<<<< सससस ेे ेे ससससबबंंबबंं ++++ पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ’’’’’’’’ संब6 पारेषण प9रयोजनाएं :::: (cid:9)(cid:9)(cid:9)(cid:9)मममम.... ििििववववRRRRततुुततुु उउउउ9999पप पप ााााददददकककक////ओओओओपपपपननेेननेे एएएए\\\\सस सस ससेेससेे एएएएििििbbbbललललकककक(cid:24)(cid:24)(cid:24)(cid:24)टटटट ////थथ थथ ााााििििपपपपतततत (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााा ((((ममममगगेेगगेे ााााववववााााटटटट)))) 1 ल"को को(ड ाप@ल ी पावर (cid:19)ाइवेट िलिमटेड 366 2 िस€ह ापरु ी एनज] (cid:19)ाइवेट िलिमटेड 600 3 मीना,ी एनज] (cid:19)ाइवेट िलिमटेड 600 4 थम(cid:14)ल पावरटेक कारपोरेशन इंिडया िलिमटेड 1320 5 मीना,ी एनज] (cid:19)ाइवेट िलिमटेड 400 6 एनसीसी पावर (cid:19)ोजे\v स िलिमटेड 1320 7 को(cid:9)ट ल एनज] (cid:19)ाइवेट िलिमटेड 1200 8 इंडो – बरथ पावर (मFास) िलिमटेड 1320 9 ई(cid:9)ट को(cid:9)ट एनज] (cid:19)ाइवेट िलिमटेड 1320 ययययोोोोगगगग 8888444444446666 उउउउUUUUचच चच (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााायययय\\ुु\\ुु तत तत ििििववववRRRRततततुुुु पपपपााााररररेेेेषषषषणणणण ककककॉॉॉॉररररीीीीडडडडोोोोरररर ---- IIIIXXXX ((((एएएएचचचचससससीीीीपपपपीीीीटटटटीीीीससससीीीी---- IIIIXXXX)))) मममम (cid:19)(cid:19) (cid:19)(cid:19)ििििनननन@@@@नन नन ििििललललििििखखखखतततत पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी शशशशााााििििममममलललल हहहह (cid:24)(cid:24) (cid:24)(cid:24):::: • शोलापुर – पुणे 765 के.वी. िPतीय एस/सी ((cid:19)थम सgकट कृ_ण ापटनम यूएमपीपी से संब- पारेषण (cid:19)णाली के अंतग(cid:14)त पहले ही शािमल) • सतना–Tव ािलयर 765 के.वी. लाइन के एक सgकट वाले एलआईएलओ Pारा उरई म(cid:25) 2x1000 एम.वी.ए. 765/400 के.वी. (cid:9)ट ेशन क (cid:9)थ ापना • आगरा-मेरठ 765 के.वी. लाइन के एलआईएलओ Pारा बुलंदशहर म(cid:25) 2x1500 एम.वी.ए. 765/400 के.वी. (cid:9)ट ेशन क (cid:9)थ ापना762 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] • िभवानी-मेरठ 765 के.वी. लाइन के एलआईएलओ Pारा सोनीपत म(cid:25) 2x1500 एम.वी.ए. 765/400 के.वी. (cid:9)ट ेशन क (cid:9)थ ापना • जबलपुर पूDलग (cid:9)ट ेशन – उरई 765 के.वी. एस/सी लाइन • उरई–बुलंदशहर – सोनीपत 765 के.वी. एस/सी लाइन • उरई–उरई (यूपीपीसीएल) 400 के.वी. (\व ाड) लाइन • सोनीपत–कु),े9 400 के.वी. (\व ाड) लाइन • सोनीपत (नया)–सोनीपत (िनमा(cid:14)णाधीन) 400 के.वी. डी/सी (\व ाड) लाइन • बुलंदशहर–हापुर (यूपीपीसीएल) 400 के.वी. (\व ाड) लाइन 8888....2222....11111111 उउउउUUUUचच चच (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााायययय\\ुु\\ुु तत तत ििििववववRRRRततुुततुु पपपपााााररररेेेेषषषषणणणण ककककॉॉॉॉररररीीीीडडडडोोोोरररर ---- XXXX ((((एएएएचचचचससससीीीीपपपपीीीीटटटटीीीीससससीीीी ---- XXXX)))):::: ’’’’’’’’आआआआIIंंIIंं (cid:11)(cid:11)(cid:11)(cid:11)ददददशशशशेेेे मममम (cid:19)(cid:19) (cid:19)(cid:19) ववववममेेममेे ााााििििगगगगररररीीीी (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे मममम (cid:19)(cid:19) (cid:19)(cid:19)आआआआईईईई....पपपपीीीी....पपपपीीीी.... पपपप????ररररययययोोोोजजजजननननाााा<<<< सससस ेे ेेससससबबंंबबंं ++++ पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी’’’’’’’’ ससससबबंंबबंं 1111 पपपपााााररररेेेेषषषषणणणण पपपप4444ररररययययोोोोजजजजननननााााएएएएंंंं : (cid:9)(cid:9)(cid:9)(cid:9)मममम.... ििििववववRRRRततुुततुु उउउउ9999पप पप ााााददददकककक ////थथ थथ ााााििििपपपपतततत (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााा ((((ममममगगेेगगेे ााााववववााााटटटट)))) 1 समलकोट पावर िलिमटेड ( पूव(cid:14) म(cid:25) (cid:27)रलायंस इ((cid:127) ा(cid:9)[ \च र ) 2400 2 (cid:9)प े\[ म पावर जनरेशन िलिमटेड 1400 3 जी.एम.आर. राजहमु्ंFी एनज] िलिमटेड 768 ययययोोोोगगगग 4444555566668888 उउउउUUUUचच चच (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााायययय\\ुु\\ुु तत तत ििििववववRRRRततततुुुु पपपपााााररररेेेेषषषषणणणण ककककॉॉॉॉररररीीीीडडडडोोोोरररर ---- XXXX ((((एएएएचचचचससससीीीीपपपपीीीीटटटटीीीीससससीीीी---- XXXX)))) मममम (cid:19)(cid:19) (cid:19)(cid:19)ििििनननन@@@@नन नन ििििललललििििखखखखतततत पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी शशशशााााििििममममलललल हहहह::(cid:24)(cid:24)::(cid:24)(cid:24) • वेमािगरी म(cid:25) 4x1500 एम.वी.ए. [ा(स फारमर सिहत 765/400 के.वी. जीआईएस पूDलग (cid:9)ट ेशन क (cid:9)थ ापना • वेमािगरी पूDलग (cid:9)ट ेशन पर गजुवाका - िवजयवाड़ा 400 के.वी. एस/सी लाइन का एलआईएलओ • ख€म म एवं हदै राबाद म(cid:25) एक-एक 2x1500 एम.वी.ए. [ा(स फारमर सिहत 765/400 के.वी. जी.आई.एस. पूDलग (cid:9)ट ेशन क (cid:9)थ ापना • हदै राबाद 765/400 के.वी. सब (cid:9)ट ेशन – हदै राबाद (मौजूदा) 400 के.वी. डी/सी (\व ाड) लाइन • ख€म म 765/400 के.वी. सब (cid:9)ट ेशन – ख€म म (मौजूदा) 400 के.वी. डी/सी (\व ाड) लाइन • हदै राबाद – वधा(cid:14) 765 के.वी. डी/सी लाइन • वेमािगरी पूDलग (cid:9)ट ेशन – ख€म म 765 के.वी. 2xडी/सी लाइन • ख€म म – हदै राबाद 765 के.वी. 2xडी/सी लाइन • वधा(cid:14) – जबलपुर पूDलग (cid:9)ट ेशन 765 के.वी. डी/सी लाइन¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 763 8888....2222....11112222 उउउउUUUUचच चच (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााायययय\\ुु\\ुु तत तत ििििववववRRRRततुुततुु पपपपााााररररेेेेषषषषणणणण ककककॉॉॉॉररररीीीीडडडडोोोोरररर ---- XXXXIIII ((((एएएएचचचचससससीीीीपपपपीीीीटटटटीीीीससससीीीी ---- XXXXIIII)))):::: ’’’’’’’’ततततििििममममललललननननााााडडडडुुुु ककककेेेे ननननाााागगगगाााापपपपYYYYननननमममम (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे मममम (cid:19)(cid:19) (cid:19)(cid:19)आआआआईईईई....पपपपीीीी....पपपपीीीी.... पपपप????ररररययययोोोोजजजजननननाााा<<<< सससस ेे ेेससससबबंंबबंं ++++ पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी’’’’’’’’ ससससबबंंबबंं 1111 पपपपााााररररेेेेषषषषणणणण पपपप4444ररररययययोोोोजजजजननननााााएएएएंंंं : (cid:9)(cid:9)(cid:9)(cid:9)मममम.... ििििववववRRRRततुुततुु उउउउ9999पप पप ााााददददकककक ////थथ थथ ााााििििपपपपतततत (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााा ((((ममममगगेेगगेे ााााववववााााटटटट)))) 1 आई.एल.एवं एफ.एस.तिमलनाडु िलिमटेड पावर 1200 कंपनी 2 पी.ई.एल. पावर िलिमटेड 1050 ययययोोोोगगगग 2222222255550000 उउउउUUUUचच चच (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााायययय\\ुु\\ुु तत तत ििििववववRRRRततततुुुु पपपपााााररररेेेेषषषषणणणण ककककॉॉॉॉररररीीीीडडडडोोोोरररर ---- XXXXIIII ((((एएएएचचचचससससीीीीपपपपीीीीटटटटीीीीससससीीीी---- XXXXIIII)))) मममम (cid:19)(cid:19) (cid:19)(cid:19) ििििनननन@@@@नननन ििििललललििििखखखखतततत पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी शशशशााााििििममममलललल हहहह (cid:24)(cid:24) (cid:24)(cid:24) :::: • नागापuनम म(cid:25) 4x1500 एम.वी.ए. [ा(स फारमर सिहत 765/400 के.वी. जी.आई.एस. पूDलग (cid:9)ट ेशन क (cid:9)थ ापना • अंत(cid:27)रम Šय व(cid:9)थ ा हते ु नागापuनम पूDलग (cid:9)ट ेशन पर नेवली– ि9ची 400 के.वी. एस/सी लाइन का एलआईएलओ, िजसे बाद म(cid:25) बायपास 'कया जाएगा। • नरे(F एवं को@ह ापुर म(cid:25) 2x1500 एम.वी.ए. के एक-एक [ा(स फारमर सिहत 765/400 के.वी.जी.आई.एस. पूDलग (cid:9)ट ेशन क (cid:9)थ ापना • मधुिगरी एवं सलेम म(cid:25) एक-एक 2x1500 एम.वी.ए., 765/400 के.वी. [ा(स फारमर क Šय व(cid:9)थ ा • नरे(F - को@ह ापुर 765 के.वी. डी/सी लाइन • को@ह ापुर 765/400 के.वी. सब (cid:9)ट ेशन म(cid:25) को@ह ापुर–मपुसा 400 केवी डी/सी के दोन% सgकट% का एलआईएलओ • सलेम-मधुिग(cid:27)र 765 केवी डी/सी लाइन-1 क इसके रे(cid:27)टत बो@ट ेज पर चा(cid:144)जग (तूतीकोरन एलटीओए प(cid:27)रयोजना के साथ योजनागत) • नरे(F (मौजूदा) तथा नरे(F 765/400 के.वी. जी.आई.एस. सब (cid:9)ट ेशन के बीच 400 के.वी. का अंत:संयोजन • नागापuनम पूDलग (cid:9)ट ेशन-सलेम 765 के.वी. डी/सी लाइन • सलेम–मधुिगरी 765 के.वी. एस/सी लाइन • मधुिगरी–नरे(F 765 के.वी. डी/सी लाइन • को@ह ापुर–पडघे 765 के.वी. डी/सी का एक सgकट वाया पुणे764 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 8888::::3333 ननननववववीीीीककककररररणणणणीीीीयययय ऊऊऊऊजजजजाााा (cid:8)(cid:8) (cid:8)(cid:8)ससससससंंससंं ााााधधधधनननन'''' सससस ेे ेेििििववववRRRRततुुततुु ििििननननPPPPकक कक षषषषणण(cid:8)(cid:8)णण(cid:8)(cid:8) हहहहततेेततेे ुु ुुपपपपााााररररेेेेषषषषणणणण ययययोोोोजजजजननननाााा ककककाााा पपपप????ररररददददAAAAृृृृ यय यय 8888....3333....1111 पपपपववववनननन एएएएवववव ंं ंंससससौौौौरररर ऊऊऊऊजजजजाााा (cid:8)(cid:8) (cid:8)(cid:8)उउउउ9999पप पप ााााददददनननन हहहहततेेततेे ुु ुुससससभभंंभभंं ााााििििववववतततत ययययोोोोजजजजननननाााा :::: पवन एवं सौर ऊजा (cid:14) उ(cid:2)प ादन ,मता के आंकलन तथा नवीनीकृत योTय ऊजा (cid:14) के िवकास हते ु संवेग को (cid:24)य ान म(cid:25) रखते #ए वृहद पारेषण कॉरीडोर को िच ि—नत करते #ए इनके नवीनीकरण हते ु संभािवत योजना बनाई गई ह।ै इसके िलए वष(cid:14) 2030 तक िव(cid:17)तु आपू*त प(cid:27)रद(cid:29)ृ य म(cid:25) नवीनीकृत योTय ऊजा(cid:14) के योगदान पर एक आंकलन कराया गया ह।ै पवन तथा सौर ऊजा(cid:14) उ(cid:2)प ादन क ,मता छ: रा3य % यथा – तिमलनाडु, आंn (cid:19)दशे , कनाट(cid:14) क, महारा_[ , गुजरात, एव ं राज(cid:9)थ ान म(cid:25) (cid:19)मुख )प से उपलNध ह।ै इनम(cid:25) से पवन ऊजा(cid:14) 165 गेगावाट तथा सौर ऊजा(cid:14) 35 गेगावाट तक हो सकती ह।ै योजनागत पारेषण कॉरीडोर को जल िव(cid:17)ुत उ(cid:2)प ादन प(cid:27)रयोजना(cid:31) हते ु योजनाब- पारेषण कॉरीडोर को एक कृत करते #ए इन रा3य % के सरOल स ऊजा (cid:14) को कम ऊजा(cid:14) उ(cid:2)प ादक रा3य % को पारेिषत करना होगा ता'क जल िव(cid:17)तु ऊजा(cid:14) स े पवन/सौर ऊजा(cid:14) क (cid:27)र\त ता को संतुिलत 'कया जा सके। 8888....3333....2222 पपपपववववनननन ततततथथथथाााा ससससौौौौरररर ऊऊऊऊजजजजाााा (cid:8)(cid:8) (cid:8)(cid:8)उउउउ9999पप पप ााााददददनननन हहहहततेेततेे ुु ुुउउउउUUUUचच चच (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााायययय\\ुु\\ुु तत तत पपपपााााररररेेेेषषषषणणणण ककककॉॉॉॉररररीीीीडडडडोोोोरररर पपपपववववनननन ततततथथथथाााा ससससौौौौरररर ऊऊऊऊजजजजाााा (cid:8)(cid:8) (cid:8)(cid:8) ककककेेेे ससससभभंंभभंं ााााििििववववतततत उउउउ9999पप पप ााााददददनननन हहहहततेेततेे ुु ुु ििििचचचचििििiiiiननननतततत उउउउUUUUचच चच (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााायययय\\ुु\\ुु तत तत पपपपााााररररेेेेषषषषणणणण ककककॉॉॉॉररररीीीीडडडडोोोोरररर ककककेेेे ििििववववववववररररणणणण ििििनननन@@@@नन नन ििििललललििििखखखखतततत हहहह (cid:24)(cid:24) (cid:24)(cid:24):::: 1. 765 के.वी. तिमलनाडु (द.,े.) आर.ई. का€O ल े\स – महारा_[ /गुजरात (प.,े.) – राज(cid:9)थ ान – ह(cid:27)रयाणा/'द@ल ी (उ.,े.) डी/सी 2. +800 के.वी. 6000 मेगावाट (म@ट ी ट*मनल) तिमलनाडु /कना(cid:14)टक आर.ई. का€O ल े\स – उ(cid:2)त र (cid:19)दशे लोड से(ट र एचवीडीसी बाइपोल 3. 765 के.वी. कना(cid:14)टक (द.,े.) आर.ई. का€O ल े\स – महारा_[ /म(cid:24)य (cid:19)दशे (प.,े) उ<र (cid:19)दशे – पंजाब (उ.,े.) लोड से(ट र डी/सी 4. 765 के.वी. तिमलनाडु / आंn (cid:19)दशे (द.,े.) आर.ई. का€O ल े\स – ओिडसा (पू.,े) झारखंड (पू.,े.) – उ(cid:2)त र (cid:19)दशे /पंजाब (उ.,े.) लोड से(ट र डी/सी 5. 765 के.वी. गुजरात आर.ई. का€O ल े\स – राज(cid:9)थ ान – ह(cid:27)रयाणा/'द@ल ी (उ.,े.) डी/सी 6. +800 के.वी. 6000 मेगावाट (म@ट ी ट*मनल) गुजरात – राज(cid:9)थ ान आर.ई. का€O ल े\स – पंजाब लोड से(ट र एचवीडीसी बाइपोल 7. 765 के.वी. राज(cid:9)थ ान आर.ई. का€O ल \े स (जसै लमरे /बाडमर – म(cid:24)य राज(cid:9)थ ान –पजं ाब – ज€म ू एवं क(cid:29)म ीर लोड से(ट र डी/सी नवीनीकृत योTय ऊजा(cid:14) उ(cid:2)प ादन (आरई) म(cid:25) (cid:19)गित, संबंिधत रा3य म(cid:25) सरOल स तथा उ(cid:2)प ादक%/रा3य % Pारा एक रा3य से दसू रे रा3य को आपू*त करन े क (cid:9)व ेqछ ा को दखे ते #ए इन पारेषण कॉरीडोर को सुदढ़ृ 'कया जाएगा।¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 765 ििििनननन@@@@नन नन ििििललललििििखखखखतततत ििििचचचच(cid:17)(cid:17)(cid:17)(cid:17) ((((सससस..ंं..ंं 8888....00002222)))) मममम (cid:19)(cid:19) (cid:19)(cid:19) उउउउपपपपररररोोोो\\\\तत तत उउउउUUUUचच चच (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााायययय\\ुु\\ुु तत तत पपपपााााररररेेेेषषषषणणणण ककककॉॉॉॉररररीीीीडडडडोोोोरररर ककककाााा एएएएकककक आआआआररररेेेेखखखख (cid:11)(cid:11)(cid:11)(cid:11)////तत तत ततुुततुु हहहह ैैैै ----ििििचचचच(cid:17)(cid:17)(cid:17)(cid:17) 8.02 J& K 900MW : Perspective Transmission Plan Jammu & For RE Capacity by 2030 Kashmir Complex Rajasthan 6 28GW : Jaisalmer Complex 7 5 Gujarat 34GW : 3 Kutch Complex 2 MAHARA SHTRA 44GW: High Capacity Corridor Satara & Sangli 765kV AC Corridor Complex HVDC Corridor 1 AndhraPradesh Karnataka 20GW : Urvakonda & 19GW : Kondapuram Complex Chitradurga Complex Gas TamilNadu 54GW: Udumalpet & Load Centers Kayathar Complex Wind/Solar Wind/SHP766 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 8.4 ससससततततललललजजजज बबबबििेेििेे ससससनननन ततततथथथथाााा ििििससससपपपपतततत घघघघााााटटटटीीीी ((((ससससततततललललजजजज बबबबििेेििेे ससससनननन)))) ककककेेेे ऊऊऊऊपपपपररररीीीी (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे मममम (cid:19)(cid:19) (cid:19)(cid:19) जजजजलललल ििििववववRRRRततुुततुु पपपप????ररररययययोोोोजजजजननननाााा<<<< सससस ेे ेे ििििववववRRRRततुुततुु ---- ििििननननPPPPकक कक षषषषणण(cid:8)(cid:8)णण(cid:8)(cid:8) हहहहततेेततेे ुु ुुममममहहहहााााययययोोोोजजजजननननाााा इस घाटी म# िचिPनत जल िवQुत प(cid:10)रयोजना9 क’ सूची िनCन िलिखत ह ै: (cid:9)(cid:9)(cid:9)(cid:9)मममम पपपप????ररररययययोोोोजजजजननननाााा ककककाााा ननननाााामममम ////थथ थथ ााााििििपपपपतततत (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााा लघ ु जल िवQुत प(cid:10)रयोजनाए ं(एसएचपी) 1 142 शांगटांग करचम 2 450 कशांग-। 3 65 कशांग - II & III 4 65 + 65 कशांग - IV 5 48 (cid:10)टड-ग - I 6 100 चांगो यांगथांग 7 140 यांगथांग खाब 8 261 ,पा 9 60 खाब 10 636 (cid:10)टड-ग -II 11 90 झंगी थोपन 12 480 थोपन पोवारी 13 480 सुC टे खाटांग 14 130 लारा सुC टे 15 104 माने-नादंग 16 70 लारा 17 60 (cid:15)कRFलग – लारा 18 40 ययययोोोोगगगग 3333444488886666 ििििननननGGGGनन नन ििििललललििििखखखखतततत ििििचचचच(cid:17)(cid:17)(cid:17)(cid:17) ((((सससस..ंं..ंं 8888....00003333)))) मममम (cid:19)(cid:19) (cid:19)(cid:19)पपपपााााररररेेेेषषषषणणणण ययययोोोोजजजजननननाााा (cid:5)(cid:5)(cid:5)(cid:5)))))तततत ततुुततुु हहहह ैैैै–––– 8888....4444....1111 ललललघघघघ ुु ुुजजजजलललल ििििववववRRRRततुुततुु पपपप????ररररययययोोोोजजजजननननााााएएएए ंं ंं ((((एएएएससससएएएएचचचचपपपपीीीी)))):::: भाबा खंड म; एसएचपी क< (cid:1)थ ापना (57 मेगावाट) के अन&ु प 2014 के म=य तक वांगटू म; 66/220/400केवी जीआईएस पू(cid:26)लग (cid:1)ट ेशन और शांगला वैली (400मगे ावाट) केवी कशांग/भाबा डी/सी लाइन तथा वांगटू म ; + 220 400केवी करचम वांगटू-अ@द 3ु ल ापुर डी/सी लाइन के दोन1 सAकट1 के एलआईएलओ क< (cid:1) थापना- एएएएससससटटटटीीीीयययय((ूू((ूू एएएएचचचचपपपपीीीीपपपपीीीीटटटटीीीीससससीीीीएएएएलललल)))) ककककेेेे ममममाााा!!!!यय यय मममम सससस ेे ेेककककााााययययाााा77667766 वव वव ययययनननन (cid:31)(cid:31)(cid:31)(cid:31)(cid:24)(cid:24)(cid:24)(cid:24)तततत ााााििििववववतततत।¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 767 ििििचचचच8888 ::::8888....00003333 Master Plan of Evacuation System KILLING - LARA 40 MW for Projects in Satjul Basin 6L 0A R MA W MANE-NA 7D 0 A MN WG LARA - SUMTE 104 MW SUMTE - KHATANG 130 MW (TWIN MOOSE) CH 1A 40N G MO W - YANGTHANG 18 Km 4 (K SIm NGLE HTLS) OSE)4K 0A 0 /D 2O 20G kR VI O YANGTH 2A 6N 1 G M - W K HAB WIN M T ( ROPA Km 60 MW 0 5 TIDONG-II KHAB TIDONG-I 90 MW OSE) 636 MW 100 MW 20 Km WIN MO (T KASH (3A xN 65G +- 4I, 8II M,II WI & ) IV (SINGLE HTLS) (QUAD HTLS)PP JJ 4 A0A N0/N G22 I G 0 T HkI V O PP AS N - THOPAN POWARI (480+480 MW) BOGTU S/S SHONGTONG - KARCHAM BASPA-II 450 MW 300 MW KARCHAM-WANGTOO 18 Km 1000 MW WANGTOO PP BHAVA 120 MW SORANG NATHPA 100 MW JHAKRI KOTLA HARYANA/PUNJAB 1500 MW WBIRD) S/S T MO OHALI (TRIPLE SNOWBR 4 I3 RA 2 DM )MP WUR L 7U 00H ( MRTRI I WPLE SNO TO KUNIHAR (TRIPLE SNO W BIRD) (Q UAD) 4 24 40 20 00 00 0 k kk kVV VV ( Q (H HU T TA LL LD S SE ) )CG OE NN D.D Existing Proposed 220 kV NALAGARH TO ABDULLAPUR POOLING POINT SUB STATION HEP TO PATIALA/KAITHAL/ MARCH 2012 HISAR768 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 8888....4444....2222 ककककशशशशाााांगंगंगंग----IIII ((((66665555 ममममेगेगेगेगााााववववााााटटटट)))):::: कशांग-I को वष (cid:14) 2013 तक चालू 'कए जान े क संभावना ह।ै कशांग -I से िव(cid:17)तु िन_क ष(cid:14)ण हते ु एच.पी. बोTट ू से कशांग तक 220 के.वी. डी/सी लाइन का िनमा(cid:14)ण कर रहा ह।ै तदनु)प बोTट ू से भाभा 220 के.वी. डी/सी लाइन से िव(cid:17)तु का िन_क ष(cid:14)ण 'कया जा सकता ह।ै 8888....4444....3333 ????टटटटडडडड''''गगगग----IIII ((((111100000000 ममममेगेगेगेगााााववववााााटटटट)))):::: य(cid:17)िप (cid:27)टड%ग-I िनमा(cid:14)णाधीन ह ै तथा इस े 'दस€ब र 2014 चाल ू 'कए जान े क संभावना ह,ै 'फर भी जंगी पूDलग (cid:9)ट ेशन उस समय तक शायद तैयार न हो सके। इसिलए (cid:27)टड%ग-। एचईपी पर 220 के.वी. डी/सी कशांग – भाभा लाइन के एक सgकट के एलआईएलओ Pारा (cid:27)टड%ग -। क िव(cid:17)ुत का अ(cid:9)थ ाई तौर a िन_क ष(cid:14)ण 'कया जाएगा। य े काय(cid:14) एचपीपीटीसीएल Pारा 'कए जाएगे तथा बाद म(cid:25) जंगी िव(cid:17)ुत के(F के चालू हो जाने पर (cid:27)टड%ग-।-जंगी लाइन का िनमा(cid:14)ण कर िलया जाएगा और Dसगल एचटीएलएस कंड\ट र सिहत कशांग-जंगी 220 के.वी. डी/सी लाइन को भी (cid:9)थ ािपत कर िलया जाएगा। ये काय (cid:14) एचपीपीटीसीएल Pारा 'कय े जाने ह।" 8888....4444....4444 ककककशशशशाााांगंगंगंग---- IIIIIIII ((((66665555 ममममगगेेगगेे ााााववववााााटटटट)))) :::: II जंगी सब (cid:9)ट ेशन म(cid:25) िवलंब होने क ि(cid:9)थित म(cid:25) कशांग - (65 मेगावाट) का िन_क ष(cid:14)ण 220 के.वी. (cid:19)णाली पर 'कए जाने क योजना ह।ै 'फर भी एक सgकट से िव(cid:17)ुत आपू*त भंग होने क आकि(cid:9)मक ि(cid:9)थित म(cid:25) कुछ अवरोध का सामना करना पड़ सकता ह।ै जंगी पूDलग (cid:9)ट ेशन क (cid:9)थ ापना कशांग के आगे के चरण% के साथ क जा सकती ह।ै 8888....4444....5555 शशशशाााांगंगंगंगटटटटाााागगंंगगंं ककककररररचचचचमममम ((((444455550000 ममममगगेेगगेे ााााववववााााटटटट)))) :::: o शांगटांग करचम – वांTट ू 400 के.वी. डी/सी लाइन (\व ाड एचटीएलएस कंड\ट र – करीब 3000 मेगावाट के समतु@य ) – 18 'कमी. – आआआआईईईईएएएएससससटटटटीीीीएएएएसससस ककककेेेे अअअअनननन,,ुु,,ुु पपपप o ि(cid:9)वचयाड (cid:14) जीआईएस क तरह हो तथा इसे 4000 एि€पयर ि(cid:9)वचिगयर के साथ िडजाइन 'कया जाए ता'क उ(cid:2)प ादन प(cid:27)रयोजना(cid:31) के अप(cid:9)[ ीम म(cid:25) योजनागत 2800-3000 मेगावाट ऊजा(cid:14) को संचािलत 'कया जा सके। III II 8888....4444....6666 ककककााााशशशशगगगगजजंंजजंं ---- ((((66665555 ममममगगेेगगेे ााााववववााााटटटट)))) एएएएवववव ंं ंं ककककााााशशशशगगगगजजंंजजंं ---- IIIIVVVV ((((44448888 ममममगगगगेेेे ााााववववााााटटटट)))) एएएएवववव ंं ंं ????टटटटडडडड''''गगगग ---- ((((99990000 ममममगगेेगगेे ााााववववााााटटटट)))) कककक.... जजजजलललल ििििववववRRRRततुुततुु पपपप????ररररययययोोोोजजजजननननााााएएएए ंं ंं ((((एएएएचचचचईईईईपपपपीीीी)))) o कशांग – जंगी पूDलग (cid:9)ट ेशन 220 के.वी. डी/सी लाइन ( Dसगल एचटीएलएस – 300 मेगावाट ,मता के समतु@य ) - एसटीयू Pारा¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 769 o जंगी म(cid:25) 2x315 एम.वी.ए. (7x105 एम.वी.ए. यूिनट) 220/400 के.वी. जी.आई.एस. पूDलग (cid:9)ट ेशन ( 4000 एि€पयर ि(cid:9)वचिगयर के साथ) (तृतीय आई.सी.टी. हते ु (cid:9)थ ल Šय व(cid:9)थ ा सिहत) आआआआईईईईएएएएससससटटटटीीीीएएएएसससस ककककेेेे अअअअनननन,,,,ुुुु पपपप o जंगी म(cid:25) शांगटांग के एक सीकेटी – वांगटू 400 के.वी. लाइन का एलआईएलओ- अंतरा(cid:14)3यीय पारेषण (cid:19)णाली (आईएसटीएस) के अनुसार o (cid:27)टड%ग – जंगी पूDलग (cid:9)ट ेशन 220 के.वी. डी/सी लाइन - एस.टी.यू. Pारा 8.4.7 चचचचाााागगंंगगंं ोोोो ययययाााांगंगंगंगथथथथाााागगंंगगंं (((( 111144440000 ममममगगेेगगेे ााााववववााााटटटट )))) : o चांग% यांगथांग – का डोगरी पूDलग (cid:9)ट ेशन 220 के.वी. डी/सी लाइन का (cid:19)(cid:9)त ािवत (cid:9)थ ल – 18 'कमी. - उ(cid:2)प ादक Pारा o का डोगरी– जंगी पूDलग (cid:9)ट ेशन 400 के.वी. डी/सी लाइन (िvवन मूज) का (cid:19)(cid:9)त ािवत (cid:9)थ ल, िजस े आरंभ म(cid:25) 220 के.वी. पर आवेिशत 'कया जाएगा- 50 'कमी. - अंतरा(cid:14)3यीय पारेषण (cid:19)णाली (आईएसटीएस) के अनुसार o जंगी पूDलग (cid:9)ट ेशन पर ततृ ीय 400/220 के.वी. आईसीटी (105 एम.वी.ए. के एकल फेज यूिनट क 03 संZय ा) - अंतरा(cid:14)3यीय पारेषण (cid:19)णाली (आईएसटीएस) के अनुसार 8888....4444....8888 ययययाााागगंंगगंं थथथथाााांगंगंगंग खखखखााााबबबब ((((222266661111 ममममेगेगेगेगााााववववााााटटटट)))) :::: o 220 के.वी. यांगथांग खाब – एचटीएलएस कंड\ट र सिहत का डोगरी डी/सी लाइन, जो 300 मेगावाट ,मता के िलए पया(cid:14)Oत ह ै – 4 'कमी. - अंतरा(cid:14)3यीय पारेषण (cid:19)णाली (आईएसटीएस) के अनुसार o का डोगरी म(cid:25) 2x315 एम.वी.ए. (7x105 एम.वी.ए. यूिनट ) 220/400 के.वी. जी.आई.एस. पूDलग (cid:9)ट ेशन - अंतरा(cid:14)3यीय पारेषण (cid:19)णाली (आईएसटीएस) के अनुसार o का डोगरी – जंगी लाइन के 400 के.वी. (cid:9)त र पर आवेशन - अंतरा(cid:14)3यीय पारेषण (cid:19)णाली (आईएसटीएस) के अनुसार o का डोगरी पूDलग (cid:9)ट ेशन पर चांगो यांगथांक का सीधा ट*मनेशन – िव(cid:17)ुत उ(cid:2)प ादक Pारा 8888....4444....9999 खखखखााााबबबब ((((666633336666 ममममगगेेगगेे ााााववववााााटटटट)))):::: o खाब – जंगी पूDलग (cid:9)ट ेशन 400 के.वी. डी/सी लाइन – 20 'कमी. - अंतरा3(cid:14) यीय पारेषण (cid:19)णाली (आईएसटीएस) के अनुसार770 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 8888....4444....11110000 जजजजगगंंगगंं ीीीी थथथथोोोोपपपपनननन ((((444488880000 ममममगगेेगगेे ााााववववााााटटटट)))) एएएएवववव ंं ंंथथथथोोोोपपपपनननन पपपपोोोोववववााााररररीीीी ((((444488880000 ममममगगेेगगेे ााााववववााााटटटट)))) :::: o उ(cid:2)प ादन प(cid:27)रयोजना पर जंगी पूDलग (cid:9)ट ेशन के एक सgकट–वांTट ू 400 के.वी. डी/सी (\व ाड एचटीएलएस) लाइन का एलआईएलओ- अंतरा3(cid:14) य ीय पारेषण (cid:19)णाली -(आईएसटीएस) के अनु)प o उ(cid:2)प ादन ि(cid:9)वचयाड (cid:14) बस रेzटग पर ि(cid:9)वचिगयर ,मता 4000 एि€पयर होगी । 8888....4444....11111111 ,,,,पपपपाााा ((((66660000 ममममगगेेगगेे ााााववववााााटटटट)))) o 220 के.वी. डी/सी लाइन स े जंगी पूDलग (cid:9)ट ेशन को (cid:19)(cid:2)य , अंत:,ेपण (डायरे\ट इ(ज े\श न) - िव(cid:17)ुत उ(cid:2)प ादक Pारा o संबंिधत ,े9 म(cid:25) लघु जल िव(cid:17)ुत प(cid:27)रयोजना(cid:31) (एसएचपी) का उ(cid:2)प ादन )पा उ(cid:2)प ादन ि(cid:9)वचयाड (cid:14) म(cid:25) अंत:,ेिपत (इ(ज े\ट ) 'कया जा सकता ह।ै q 8888....4444....11112222 ििििससससपपपपतततत घघघघााााटटटटीीीी ((((ससससततततललललजजजज बबबबििेेििेे ससससनननन)))) कककक.... अअअअ1111यय यय पपपप????ररररययययोोोोजजजजननननााााएएएए::ंं::ंं o इन प(cid:27)रयोजना(cid:31) का उ(cid:2)प ादन, का डोगरी पूDलग (cid:9)ट ेशन पर अंत:,ेिपत (इ(ज े\ट ) 'कया जा सकता ह।ै o लारा सु€ट े एचईपी तक 'कD@लग लारा (40 मेगावाट) से, लारा (60 मेगावाट) एवं माने नदगं (70 मेगावाट), क 220 के.वी. क एक संयु\त डी/सी लाइन तैयार क जा सकती ह।ै लारा सु€ट े एचईपी (104 मेगावाट) से, (िvवन मूज कंड\ट र सिहत) 220 के.वी. उqच ,मता क लाइन का डोगरी पूDलग (cid:9)ट ेशन तक तैयार क जा सकती ह।ै 50 मेगावाट से कम जने रेटर% को छोड़कर अंतरा(cid:14)3यीय पारेषण (cid:19)णाली (आईएसटीएस) के अनु)प '(cid:15)या(व यन (cid:19)(cid:9)त ािवत ह।ै o का डोगरी म(cid:25) [ा(स फारमेशन ,मता म(cid:25) संवध(cid:14)न क आव(cid:29)य कता होगी। 315 एम.वी.ए. (105 एम.वी.ए. एकल फेज यूिनट) के 2 अित(cid:27)र\त आईसीटी के िलए (cid:9)थ ान अपेि,त होगा। उ(cid:2)प ादन संवध(cid:14)न के अन)ु प इन [ा(स फारमर% को उ(cid:2)त रो(cid:2)त र उपलNध कराया जाएगा। - अंतरा(cid:14)3य ीय पारेषण (cid:19)णाली (आईएसटीएस) के अनु)प – ििििववववशशशशषषेेषषेे :::: मौजूदा/योजनागत (cid:19)णाली, वांTट ू (cid:9)ट ेशन के आगे लगभग 500 600 मेगावाट ऊजा(cid:14) (इन उ(cid:2)प ादन प(cid:27)रयोजना के िवकास होने पर इसक पुि2 क जा सकती है) संचािलत करने म(cid:25) समथ (cid:14) होगी। वांTट ू स े ह(cid:27)रयाणा/पंजाब क ओर उqच ,मताय\ु त एक अित(cid:27)र\त लाइन (400 के.वी. \व ाड) क आव(cid:29)य कता होगी, िजसे नदी के दि,णी तट पर तैयार 'कया जा सकता ह।ै¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 771 8888....5555 चचचच111133 33 भभभभाााागगगगाााा बबबबििेेििेे ससससनननन मममम (cid:19)(cid:19) (cid:19)(cid:19)जजजजलललल ििििववववRRRRततुुततुु पपपप????ररररययययोोोोजजजजननननाााा<<<< सससस ेे ेे ििििववववRRRRततततुुुु ---- ििििननननPPPPकक कक षषषषणण(cid:8)(cid:8)णण(cid:8)(cid:8) हहहहततेेततेे ुु ुुममममहहहहााााययययोोोोजजजजननननाााा 8888....5555....1111 इस बेिसन म# िचिPनत जल िवQुत प(cid:10)रयोजनाएं िनCन िलिखत ह S: (cid:1)(cid:1)(cid:1)(cid:1)मममम पपपप4444ररररययययोोोोजजजजननननाााा ककककाााा ननननाााामममम ))))थथ थथ ााााििििपपपपतततत (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााा ((((ममममगगगगेेेे ााााववववााााटटटट मममम))(cid:19)(cid:19)))(cid:19)(cid:19) छIु 1 120 तेRलग 2 94 शांगRलग 3 44 िज(cid:21) पा 4 300 टांडी 5 104 रािशल 6 130 बरदंग 7 126 (cid:10)टगनेट 8 81 पUम 9 60 सेली 10 400 िमयार 11 120 रेवली दVु ल ी 12 420 साच खास 13 149 पूरथी 14 300 दVु गर 15 236 लघ ु जल िवQुत प(cid:10)रयोजनाए ं(एसएचपी) 16 300 अ= य 17 500 योग 3333555500000000772 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] पपपपााााररररेेेेषषषषणणणण ययययोोोोजजजजननननाााा ििििनननन////नन नन ििििललललििििखखखखतततत ििििचचचच8888 ((((सससस..ंं..ंं 8888....00004444)))) मममम :: ::(cid:31)(cid:31)(cid:31)(cid:31)(cid:24)(cid:24)(cid:24)(cid:24)तततत ततुुततुु कककक;;;; गगगगईईईई हहहह ैै ैै इस ,े9 म(cid:25) कुल ऊजा (cid:14) 3500 मेगावाट ह।ै इन प(cid:27)रयोजना(cid:31) म(cid:25) स े दो प(cid:27)रयाजनाए ं – िमयार एवं सेली के 2017 तक तथा तीन प(cid:27)रयोजनाए ं - छा9ु, रेवली दTु ल ी एवं साच खास वष(cid:14) 2018 तक तैयार हो सकती ह।ै इस ,े9 क अगली संभािवत प(cid:27)रयोजना िज(cid:9)प ा होगी। अ(य प(cid:27)रयोजना(cid:31) क ि(cid:9)थित तथा समय- सीमा अभी तक (cid:9)प _ट नह8 ह।ै UMMAJ )ADOD( RAGUD )WM 063( MATTAP )WM 06( )T WE MN 1G 8(IT )WIL MG 0U 24D ( SAH )WK M H 9C 41A (S ILES )WM 004( )WMAP 0S 03IJ ( G )N WA MD 1R 41A (B )WR MAY 0I 9M ( LISAR GNILAHS IDNAT )WM 051( )WM 051( URTTAHC GNILLET )WM 041( )WM 49( GA RA BHA HAND C R R I V E PH NI NISAB AGAHBARDNAHC MORF TNEMEGNARRA NOITAUCAVE REWOP WIN HTLS) HENAB (T C RIVER IHTRUP )WM 003( ILOER )ESOO M N IW T( HTLS) N WI (T USSIS SP )SLTH ELPIRT( RUPRIMAH NE) HTLS LI ( )WM 44( N)E TH I LL S ( )ITIPS & LUAHAL( DNEGEL desoporP gnitsixE )SLTH( Vk 004 )ESOOM NIWT( Vk 004 )SLTH( Vk 022 Vk 022 TNIOP GNILOOP PEH 2102 HCRAM¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 773 उ(cid:2)प ादन, कॉरीडोर क उपलNध ता, सेली के पास मागाि(cid:14) धकार (राइट ऑफ वे) क िवकट सम(cid:9)य ा, ऊजा (cid:14) क (cid:19)मा9ा (\व ांटम) के आधार पर दो पारेषण कॉरीडोर - एक हमीरपुर तथा दसू रा ज€म ू एवं क(cid:29)म ीर क ओर लगाया जाना उपय\ु त समझा गया। ऐसा (cid:19)(cid:9)त ािवत ह ै 'क सले ी एचईपी से आरंभ होने वाला पारेषण कॉरीडोर हमीरपुर क ओर तथा रेवली दTु ल ी स े आरंभ होने वाला कॉरीडोर ज€म ू - क(cid:29)म ीर क ओर जाएगा। हमीरपुर क ओर जाने वाले कॉरीडोर क ,मता 2500 मेगावाट तथा ज€म ू – क(cid:29)म ीर क ओर जान े वाले कॉरीडोर क ,मता 1500 मेगावाट होगी। उपरो\त त˜य % को (cid:24)य ान म(cid:25) रखते #ए िन€न िलिखत पारेषण (cid:19)णाली (cid:19)(cid:9)त ािवत ह", जो उ(cid:2)प ादन प(cid:27)रयोजना(cid:31) को चालू 'कए जाने के समय तक तैयार ह%गी : चचचच11113333भभभभाााागगगगाााा ककककॉॉॉॉररररीीीीडडडडोोोोरररर ----।।।। 8888....5555....2222 ससससललेेललेे ीीीी एएएएचचचचईईईईपपपपीीीी ((((444400000000 ममममेगेगेगेगााााववववााााटटटट)))):::: o सेली स े िस(cid:9)स /ू >ा€फ ू (इस समयाविध म(cid:25) पूDलग (cid:9)ट ेशन सभं वत: तैयार न हो सके), 400 के.वी. डी/सी लाइन (िvवन एचटीएलएस-लगभग 2000 मेगावाट हते ु पया(cid:14)Oत )-अतरा(cid:14)3य ीय पारेषण (cid:19)णाली (आईएसटीएस) के अनु)प o िस(cid:9)स ू/>ा€फ ू पूDलग (cid:9)ट ेशन के पास (cid:19)(cid:9)त ािवत (cid:9)थ ल-हमीरपुर 400 के.वी. डी/सी ((cid:27)[पल एचटीएलएस-लगभग 2500 मेगावाट हते ु पया(cid:14)Oत )-इस लाइन खंड पर, रोहतंग पास को (cid:15)ास 'कया ka जाना होगा। यह शीतकाल म(cid:25) 8-10 फुट बफ(cid:14) होने के कारण काय(cid:14) हते ु ब#त कम समय िमलेगा, ka िजसके प(cid:27)रणाम (cid:9)व )प इसके '(cid:15)या(व यन म(cid:25) चुनौितय आएगं ी। -अतरा(cid:14)3य ीय पारेषण (cid:19)णाली (आईएसटीएस) के अनु)प 8888....5555....3333 ििििममममययययाााारररर एएएएचचचचईईईईपपपपीीीी ((((111122220000 ममममगगेेगगेे ााााववववााााटटटट )))) :::: o िमयार म(cid:25) सेली-हमीरपुर (वाया रोहतंग) 400 के.वी. डी/सी लाइन (िvवन एचटीएलएस) के एक a सgकट का एलआईएलओ - अअअअततततरररराााा&&(cid:8)(cid:8)&&(cid:8)(cid:8) यय यय ीीीीयययय पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ((((आआआआईईईईएएएएससससटटटटीीीीएएएएसससस)))) ककककेेेे (cid:11)(cid:11)(cid:11)(cid:11)////तत तत ाााावववव ककककेेेे अअअअननननससुुससुु ाााारररर (cid:20)(cid:20)(cid:20)(cid:20)(cid:9)(cid:9)(cid:9)(cid:9)ययययाााा1111वव वव ययययनननन 8888....5555....4444 छछछछाााा(cid:17)(cid:17)(cid:17)(cid:17) ुु ुुएएएएचचचचईईईईपपपपीीीी ((((111122220000 ममममगगेेगगेे ााााववववााााटटटट)))) :::: o िस(cid:9)स ु/>ा€फ ू के पास 2x315 मेगावाट (7x105 एकल फेज यूिनट) 400/220 के.वी. जी.आई.एस. पूDलग (cid:9)ट ेशन क (cid:9)थ ापना - अतरा(cid:14)3य ीय पारेषण (cid:19)णाली (आईएसटीएस) के अनु)प o छा9ु-िस(cid:9)स ु/>ा€फ ू के जी.आई.एस. पूDलग (cid:9)ट ेशन 220 के.वी. डी/सी लाइन (एचटीएलएस 300 मेगावाट (cid:19)ित सgकट हते ु पया(cid:14)Oत )-अतरा(cid:14)3य ीय पारेषण (cid:19)णाली (आईएसटीएस) के अनु)प o िस(cid:9)स ु/>ा€फू जीआईएस पूDलग (cid:9)ट ेशन पर सेली-हमीरपुर के दोन% सgकट% का एलआईएलओ - अअअअततततरररराााा&&(cid:8)(cid:8)&&(cid:8)(cid:8) यय यय ीीीीयययय पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ((((आआआआईईईईएएएएससससटटटटीीीीएएएएसससस)))) ककककेेेे (cid:11)(cid:11)(cid:11)(cid:11)////तत तत ाााावववव ककककेेेे अअअअनननन,,ुु,,ुु पपपप 8888....5555....5555 तततत--ेे--ेे ललललगगगग एएएएवववव ंं ंंशशशशाााांगंगंगंग----ललललगगगग एएएएचचचचईईईईपपपपीीीी ((((99994444 एएएएवववव ंं ंं44444444 ममममगगेेगगेे ााााववववााााटटटट)))) :::: o तेDलग म(cid:25) छा9ु-िस(cid:9)स ु/>ा€फू पूDलग (cid:9)ट ेशन 220 के.वी. डी/सी (एचटीएलएस) के एक सgकट का a एलआईएलओ - अअअअततततरररराााा&&(cid:8)(cid:8)&&(cid:8)(cid:8) यय यय ीीीीयययय पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ((((आआआआईईईईएएएएससससटटटटीीीीएएएएसससस)))) ककककेेेे अअअअनननन,,ुु,,ुु पपपप o शांगDलग म(cid:25) छा9ु-िस(cid:9)स ु/>ा€फू पूDलग (cid:9)ट ेशन 220 के.वी. डी/सी (एचटीएलएस) के एक सgकट का एलआईएलओ – एएएएससससटटटटीीीीयययय ूू ूूअअअअथथथथववववाााा उउउउ9999पप पप ााााददददकककक ccccाााारररराााा िवशेष : छा9ु, तेDलग एव ं Dशगलांग एचईपी म(cid:25) उ(cid:2)प ादन ि(cid:9)वचयाड (cid:14) क ,मता, 300 मेगावाट ऊजा(cid:14) संचालन ,मता के बराबर होगी अ(य था एक सgकट से िव(cid:17)ुत आपू*त भंग होने क आकि(cid:9)मक ि(cid:9)थित म(cid:25) कुछ अवरोध का सामना करना पड़ सकता ह।ै774 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 8888....5555....6666 ििििजजजज////पप पप ाााा ((((333300000000 ममममगगेेगगेे ााााववववााााटटटट)))) :::: o a िज(cid:9)प ा – िस(cid:9)स ु/>ा€फ ू पूDलग (cid:9)ट ेशन 400 के.वी. डी/सी लाइन - अअअअततततरररराााा&&(cid:8)(cid:8)&&(cid:8)(cid:8) यय यय ीीीीयययय पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ((((आआआआईईईईएएएएससससटटटटीीीीएएएएसससस)))) ककककेेेे अअअअनननन,,ुु,,ुु पपपप 8888....5555....7777 बबबबररररददददगगंंगगंं एएएएचचचचईईईईपपपपीीीी ((((111122226666 ममममेगेगेगेगााााववववााााटटटट)))) :::: o सेली–िस(cid:9)स ु/>ा€फ ू पूDलग (cid:9) टेशन 400 के.वी. डी/सी (िvवन एचटीएलएस) लाइन के एक सgकट का a एलआईएलओ - अअअअततततरररराााा&&(cid:8)(cid:8)&&(cid:8)(cid:8) यय यय ीीीीयययय पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ((((आआआआईईईईएएएएससससटटटटीीीीएएएएसससस)))) ककककेेेे अअअअनननन,,ुु,,ुु पपपप 8888....5555....8888 ररररााााििििससससलललल एएएएचचचचईईईईपपपपीीीी ((((111133330000 ममममेगेगेगेगााााववववााााटटटट)))) o सेली–िस(cid:9)स ु/>ा€फ ू पूDलग सट ् ेशन 400 के.वी. डी/सी (िvवन एचटीएलएस) लाइन के एक सgकट का a एलआईएलओ - अअअअततततरररराााा&&(cid:8)(cid:8)&&(cid:8)(cid:8) यय यय ीीीीयययय पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ((((आआआआईईईईएएएएससससटटटटीीीीएएएएसससस)))) ककककेेेे अअअअनननन,,ुु,,ुु पपपप 8888....5555....9999 टटटटkkkkडडडडीीीी एएएएचचचचईईईईपपपपीीीी ((((111100004444 ममममेगेगेगेगााााववववााााटटटट )))) :::: o सेली–िस(cid:9)स ु/>ा€फ ू पूDलग (cid:9) टेशन 400 के.वी. डी/सी (िvवन एचटीएलएस) लाइन के एक सgकट का a एलआईएलओ - अअअअततततरररराााा&&(cid:8)(cid:8)&&(cid:8)(cid:8) यय यय ीीीीयययय पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ((((आआआआईईईईएएएएससससटटटटीीीीएएएएसससस)))) ककककेेेे अअअअननननससुुससुु ाााारररर 8888....5555....11110000 पपपपYYYYमममम एएएएचचचचईईईईपपपपीीीी ((((66660000 ममममगगेेगगेे ााााववववााााटटटट )))) :::: o a पuम-िमयार 220 के.वी. डी/सी -अअअअततततरररराााा&&(cid:8)(cid:8)&&(cid:8)(cid:8) यय यय ीीीीयययय पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ((((आआआआईईईईएएएएससससटटटटीीीीएएएएसससस)))) ककककेेेे अअअअननननससुुससुु ाााारररर o िमयार म(cid:25) 1x250 एम.वी.ए. (83.3 एम.वी.ए. एकल फेज यूिनट क 04 संZय ा), 220/400 के.वी. जीआईएस पूDलग (cid:9)ट ेशन क Šय व(cid:9)थ ा। िमयार ि(cid:9)वचयाड (cid:14) म(cid:25) (cid:9)थ ान क कमी होने क ि(cid:9)थित म(cid:25) एक a अलग पूDलग (cid:9)ट ेशन क आव(cid:29)य कता पड़गे ी- अअअअततततरररराााा&&(cid:8)(cid:8)&&(cid:8)(cid:8) यय यय ीीीीयययय पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ((((आआआआईईईईएएएएससससटटटटीीीीएएएएसससस)))) ककककेेेे अअअअनननन,,ुु,,ुु पपपप 8888....5555....11111111 ????टटटटगगगगननननटटेेटटेे एएएएचचचचईईईईपपपपीीीी ((((88881111 ममममगगेेगगेे ााााववववााााटटटट )))) o a पuम–िमयार 220 के.वी. डी/सी के एक सgकट का एलआईएलओ -अअअअततततरररराााा&&(cid:8)(cid:8)&&(cid:8)(cid:8) यय यय ीीीीयययय पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ((((आआआआईईईईएएएएससससटटटटीीीीएएएएसससस)))) ककककेेेे अअअअनननन,,ुु,,ुु पपपप o पuम एवं (cid:27)टगनेट एचईपी क पारेषण (cid:19)णािलय% के िलए माना जाता ह ै 'क पuम, (cid:27)टगनेट से पहले आएगी। य'द (cid:27)टगनेट, पuम से पहले तैयार हो जाती ह ै तो (cid:27)टगनेट एचईपी के समय पर 220 के.वी. डी/सी लाइन एवं आईसीटी क Šय व(cid:9)थ ा करनी पड़गे ी। ििििववववशशशशषषेेषषेे :::: (नई प(cid:27)रयोजना(cid:31) क आव(cid:29)य कता/उनके चालू होने के आधार पर हमीरपुर स े आगे के िलए a अित(cid:27)र\त (cid:19)णाली क योजना बनाई जाएगी।) अअअअततततरररराााा&&(cid:8)(cid:8)&&(cid:8)(cid:8) यय यय ीीीीयययय पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ((((आआआआईईईईएएएएससससटटटटीीीीएएएएसससस)))) ककककेेेे अअअअनननन,,ुु,,ुु पपपप II चचचच11113333भभभभाााागगगगाााा ककककॉॉॉॉररररीीीीडडडडोोोोरररर ---- 8888....5555....11112222 सेली एचईपी के डाउन(cid:9)[ ीम म(cid:25) उ(cid:2)प ादन प(cid:27)रयोजनाए ं अथा(cid:14)त रेवली दTु ल ी (420 मेगावाट), साच खास (149 मेगावाट) पुरथी (300 मेगावाट) एवं दTु ग र (236 मेगावाट) आ'द प(cid:27)रयोजनाए ं ज€म ू ,े9 के पास होने के कारण इनका िन_क ष(cid:14)ण ज€म ू ,े9 से 'कया जाना (cid:19)(cid:9)त ािवत था, परंतु सेली से रेवली दTु ग ी तक मागा(cid:14)िधकार (राइट ऑफ वे) के िवकट अवरोध के कारण एक कॉ(cid:27)रडर स े कुल 3850 मेगावाट ऊजा(cid:14) का िन_क ष(cid:14)ण Šय ावहा(cid:27)रक/िव(cid:29)व सनीय न हो।¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 775 8888....5555....11113333 ररररेेेेववववललललीीीी ददददllllुुुु लल लल ीीीी एएएएचचचचईईईईपपपपीीीी ((((444422220000 ममममेगेगेगेगााााववववााााटटटट)))) एएएएवववव ंं ंंससससााााचचचच खखखखाााासससस ((((111144449999 ममममगगेेगगेे ााााववववााााटटटट)))) :::: o रवेली दTु ल ी-'क(cid:29)त वार 400 के.वी. डी/सी (िvवन एचटीएलएस -1500 मेगावाट हते ु पया(cid:14)Oत ) a अअअअततततरररराााा&&(cid:8)(cid:8)&&(cid:8)(cid:8) यय यय ीीीीयययय पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ((((आआआआईईईईएएएएससससटटटटीीीीएएएएसससस)))) ककककेेेे अअअअनननन,,ुु,,ुु पपपप o a 'क(cid:29)त वार म(cid:25) 400 के.वी. ि(cid:9)वDचग (cid:9)ट ेशन क (cid:9)थ ापना - अअअअततततरररराााा&&(cid:8)(cid:8)&&(cid:8)(cid:8) यय यय ीीीीयययय पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ((((आआआआईईईईएएएएससससटटटटीीीीएएएएसससस)))) ककककेेेे अअअअनननन,,ुु,,ुु पपपप o 'क(cid:29)त वार म(cid:25) दलु ह(cid:9)त ी/राvले-'कशेनपुर 400 के.वी. डी/सी (\व ाड) लाइन का एलआईएलओ - a अअअअततततरररराााा&&(cid:8)(cid:8)&&(cid:8)(cid:8) यय यय ीीीीयययय पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ((((आआआआईईईईएएएएससससटटटटीीीीएएएएसससस)))) ककककेेेे अअअअनननन,,ुु,,ुु पपपप o a साच खास म(cid:25) रेवली-'क(cid:29)त वार के एक सgकट का एलआईएलओ - अअअअततततरररराााा&&(cid:8)(cid:8)&&(cid:8)(cid:8) यय यय ीीीीयययय पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ((((आआआआईईईईएएएएससससटटटटीीीीएएएएसससस)))) ककककेेेे अअअअनननन,,ुु,,ुु पपपप o पावर हाउस पर जनरेzटग ि(cid:9)वचयाड (cid:14) ,मता 1500 मेगावाट रखनी Oड़ गे ी। 8888....5555....11114444 पपपपररुुररुु थथथथीीीी एएएएचचचचईईईईपपपपीीीी ((((333300000000 ममममगगेेगगेे ााााववववााााटटटट)))) :::: o उ(cid:2)प ादन (cid:9)ट ेशन पर रेवली-'क(cid:29)त वाड़ 400 के.वी. डी/सी के एक सgकट कस एलआईएलओ - a अअअअततततरररराााा&&(cid:8)(cid:8)&&(cid:8)(cid:8) यय यय ीीीीयययय पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ((((आआआआईईईईएएएएससससटटटटीीीीएएएएसससस)))) ककककेेेे अअअअनननन,,ुु,,ुु पपपप o पावर हाउस पर 1500 मेगावाट हते ु जनरेzटग ि(cid:9)वचयाड (cid:14) ,मता रखनी होगी। 8888....5555....11115555 ददददllllुुुु गग गग रररर एएएएचचचचईईईईपपपपीीीी ((((222233336666 ममममगगेेगगेे ााााववववााााटटटट)))) :::: o a उ(cid:2)प ादन के(F पर रेवली-'क(cid:29)त वाड़ 400 के.वी./डी/सी के एक सgकट का एलआईएलओ - अअअअततततरररराााा&&(cid:8)(cid:8)&&(cid:8)(cid:8) यय यय ीीीीयययय पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ((((आआआआईईईईएएएएससससटटटटीीीीएएएएसससस)))) ककककेेेे अअअअनननन,,ुु,,ुु पपपप o पावर हाउस पर 1500 मेगावाट हते ु जनरेzटग ि(cid:9)वचयाड (cid:14) ,मता रखनी होगी। ििििववववशशशशषषेेषषेे : हालां'क 'क(cid:29)त वार के आगे कुछ गुंजाइश हो सकती ह,ै 'फर भी उ(cid:2)प ादन संवधन(cid:14) के आधार पर (cid:19)णाणी को सश\त 'कया जाना अपेि,त होगा। पावर हाउस पर 1500 मेगावाट हते ु जनरेzटग a ि(cid:9)वचयाड (cid:14) ,मता रखनी होगी। - अअअअततततरररराााा&&(cid:8)(cid:8)&&(cid:8)(cid:8) यय यय ीीीीयययय पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ((((आआआआईईईईएएएएससससटटटटीीीीएएएएसससस)))) ककककेेेे अअअअनननन,,,,ुुुु पपपप 8888....6666 ररररााााबबबबीीीी औऔऔऔरररर (cid:31)(cid:31)(cid:31)(cid:31)यय यय ाााासससस बबबबििेेििेे ससससनननन मममम (cid:19)(cid:19) (cid:19)(cid:19)जजजजलललल ििििववववRRRRततुुततुु पपपप????ररररययययोोोोजजजजननननाााा<<<< सससस ेे ेेििििववववRRRRततुुततुु ---- ििििननननPPPPकक कक षषषषणण(cid:8)(cid:8)णण(cid:8)(cid:8) हहहहततततेेेे ुु ुुममममहहहहााााययययोोोोजजजजननननाााा 8888....6666....1111 ररररााााबबबबीीीी बबबबििेेििेे ससससनननन :::: इस बेिसन म(cid:25) िचि—नत जल िव(cid:17)ुत प(cid:27)रयोजना(cid:31) क सूची िन€न िलिखत ह ै :- la- (cid:9)(cid:9)(cid:9)(cid:9)मममम पपपप????ररररययययोोोोजजजजननननाााा ककककाााा ननननाााामममम ////थथ थथ ााााििििपपपपतततत (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााा ((((ममममगगेेगगेे ााााववववााााटटटट मममम))(cid:19)(cid:19)))(cid:19)(cid:19) 1 चमेरा – I 540 2 चमेरा – II 300 3 चमेरा – III 231 4 बुिधल 70 5 कुठेर 260 6 िबजोली होली 200 7 बाड़ा बंगाल 200 8 बड़मर 45776 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 9 हडसर 60 10 कुTती 45 ययययोोोोगगगग 1111999955551111 पपपपााााररररेेेेषषषषणणणण पपपप????ररररययययोोोोजजजजननननाााा ििििनननन@@@@नननन ििििललललििििखखखखतततत ििििचचचच(cid:17)(cid:17)(cid:17)(cid:17) ((((8888....00005555)))) मममम (cid:19)(cid:19) (cid:19)(cid:19)ददददशशशशााााईई(cid:8)(cid:8)ईई(cid:8)(cid:8) गगगगईईईई हहहह ैै ैै:::: Master Plan of Evacuation System for Projects in Rabi Basin LEGEND Existing Proposed 400 kV 220 kV ( 2x0.5 COND.) 220 kV ( HIGH CAPCITY COND. WITH AMPACITY SAME AS TWIN MOOSE) TO KISHENPUR 220 kV ( 0.4 COND.) 400 kV S/S 220 kV S/S Generation step-up to 400 kV Generation step-up to 220 kV KUGTI 45MW BHARMOUR CHAMERA-I KARIAN 220 kV 45 MW HADSAR 540 MW S/S (HPPTCL) 60 MW CHAMERA-III 231 MW BUDHIL BARA CHAMBA 70 MW BHANGAL 125MW 200MW CHAMERA-II 300 MW CHAMERA (4 L0 AP 0 H. S k AV L) KU 26T 0E MHR W B 2A 0J 0O ML WI HOLI P.S 400/220 kV TO JULLUNDER राबी बेिसन म(cid:25) चमेरा-। (540 मेगावाट) एवं चमेरा-।। (300 मेगावाट) दो (cid:19)मुख प(cid:27)रयोजनाए ं मौजूद ह।" चमेरा-। से जु@ल ुंधर-400 के.वी. डी/सी लाइन तथा चमेरा-। से 'कशेनपुर 400 के.वी. एस/सी लाइन,(cid:25) िजसे चमेरा-।। म(cid:25) एलआईएलओ 'कया गया ह,ै िन_क षण(cid:14) हते ु मौजूद ह।" चमेरा-।।। (231 मेगावाट) एवं बुिधल (70 मेगावाट) िनमा(cid:14)णीधीन ह " तथा कुठेर (260 मेगावाट), िबजोली होली (200 मेगावाट), बाड़ा बंगाल (200 मेगावाट), बड़मर (45 मेगावाट), हड़सर (60 मेगावाट) और कुTत ी (45 मेगावाट) आ'द प(cid:27)रयोजना(cid:31) हते ु योजनाए ं बनाई गई ह।" चमेरा-।। के अप(cid:9)[ ीम क प(cid:27)रयोजना(cid:31) से िव(cid:17)ुत िन_क ष(cid:14)ण हते ु चमेरा-।। के िनकट 400/220 के.वी. के एक पूDलग (cid:9)ट ेशन क योजना बनाई गई ह,ै जो बुिधल एचईपी के समयानुकूल होगी और यह इस घाटी क अगली प(cid:27)रयोजना होगी। यह पूDलग (cid:9)ट ेशन, चमेरा-।। से 400 के.वी. एस/सी लाइन और जु@ल ुंधर से 400 के.वी. डी/सी लाइन Pारा संयोिजत होगा। अगली पीढ़ी क प(cid:27)रयोजना चमेरा-।।। के िलए जु@ल ुंधर पारेषण लाइन क आव(cid:29)यकता होगी। इस हते ु 220 के.वी. का एक पूDलग (cid:9)ट ेशन, चमेरा-।।। के उिचत अप(cid:9)[ ीम लोकेशन पर भी (cid:19)(cid:9)त ािवत ह,ै जहाँ ि़व(cid:17)ुत पूल 'कए जाने तथा वहाँ स े 1x मूज कंड\ट र% से 220 के.वी. क तीन डी/सी लाइन% Pारा चमेरा-।। के 400/220 के.वी. पूDलग (cid:9)ट ेशन को पारेिषत 'कए जाने क योजना ह।ै प(cid:27)रयोजना(cid:31) के चरणब- िवकास म(cid:25) उपरो\त अनुकूलतम समाधान ह%गे। 'फर भी, य'द घाटी स े होकर 220 के.वी. डी/सी क तीन लाइन% के िनमा(cid:14)ण म (cid:25)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 777 Šय ावहा(cid:27)रक सम(cid:9)य ा होगी, तो 2 xमूज कंड\ट र% सिहत 220 के.वी. डी/सी क दो लाइन% का िनमा(cid:14)ण अपेि,त होगा। 8888....6666....2222 (cid:31)(cid:31)(cid:31)(cid:31)यय यय ाााासससस बबबबििेेििेे ससससनननन :::: इस बेिसन म(cid:25) िचि—नत जल िव(cid:17)ुत प(cid:27)रयोजना(cid:31) क सूची िन€न िलिखत ह ै :- (cid:1)(cid:1)(cid:1)(cid:1)मममम पपपप4444ररररययययोोोोजजजजननननाााा ककककाााा ननननाााामममम (cid:24)(cid:24)(cid:24)(cid:24)थथ थथ ााााििििपपपपतततत (cid:26)(cid:26)(cid:26)(cid:26)ममममतततताााा la- ((((ममममगगेेगगेे ााााववववााााटटटट मममम))::)):: मलाना 1 - I 87 लारजी 2 126 ए(cid:2)ल ेन डुहगं न/ 3 Allain Duhangan 192 मलाना 4 - II 100 को(cid:2)ड म 5 800 पारबती -।। 6 800 पारबती-।।। 7 501 स(cid:10)ज 8 100 ययययोोोोगगगग 2222777700006666778 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] पपपपााााररररेेेेषषषषणणणण पपपप4444ररररययययोोोोजजजजननननाााा ििििनननन////नननन ििििललललििििखखखखतततत ििििचचचच8888 ((((8888....00006666)))) मममम :: ::ददददशशशशााााईईईई6666 गगगगईईईई हहहह ैै ैै:::: Master Plan of Evacuation System for Projects in Beas Basin FROM DUGLI 220kV and HVDC P S (about 1500 MW) FROM CHENAB BASIN FROM TANDI 220kV P S (about 1200 MW) MALANA-I 87 MW ALLAIN DUHANGAN MALANA-II 192 MW 100 MW PARBATI II 800 MW SAINJ HEP 100 MW CHHAUR BAJORA S/S PARBATI III 501 MW HAMIR PUR PARBATI POOLING TO AMRITSAR LARJI 126 MW KOLDAM HEP 800 MW FROM NATHPA JHAKRI TO LUDHIANA/MOGA LEGEND Existing Proposed 400 kV QUAD COND. TO MANDI/GAGAL/ 400 kV TRIPLE COND. KUNIHAR/HAMIR PUR 400 kV TWIN COND. HVDC bi-pole + 400 kV TO LUDHIANA 1500 MW with 50% over-load (with Cables where necessary) 220 kV ( 4x0.5 COND.) (with Cables where necessary) 220 kV ( 0.4 COND.) NALAGARH 132 kV ( 0.3 COND.) 400 kV S/S Total Power about 2700 MW + 220 kV S/S 132 kV S/S 1500-2000 MW from Chandrabhaga Basin Generation step-up to 400 kV TO PATIALA/KAITHAL/ TO NR GRID Generation step-up to 220 kV HISAR NEW FUTURE S/S Generation step-up to 132 kV Nय ास बेिसन म(cid:25) मलाना-। (87 मेगावाट) एवं लारजी (126 मेगावाट) दो (cid:19)मुख प(cid:27)रयोजनाए ं मौजूद ह।" इन दोन% प(cid:27)रयोजना(cid:31) से िव(cid:17)ुत िन_क ष(cid:14)ण 132 के.वी. एचपीएसईबी (cid:19)णाली से 'कया जा रहा ह।ै Nय ास/पारबती बेिसन म(cid:25) अ(य (cid:19)मुख योजनाए ं – डुहगं न (192 मेगावाट), मलाना-।। (100 मेगावाट), को@ड म (800 मेगावाट), पारबती-।। (800 मेगावाट), पारबती-।।। (501 मेगावाट) तथा स"ज (100¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 779 मेगावाट) ह।" को@ड म, पारबती-।। एवं पारबती-।।। से िव(cid:17)ुत िन_क ष(cid:14)ण 400 के.वी. Pारा 'कए जान े क योजना ह।ै पारेषण लाइन(cid:25) ह " :- o को@ड म-नालागढ़ 400 के.वी. डी/सी \व ाड कंड\ट र लाइन o पारबती-।।-को@ड म 400 के.वी. 2xएस/सी \व ाड कंड\ट र लाइन o को@डम-लुिधयाना 400 के.वी. डी/सी (cid:27)[पल कंड\ट र पारबती-।।। के साथ पनसा(cid:14) म(cid:25) एक पूDलग (cid:9)ट ेशन (cid:19)(cid:9)त ािवत ह ै तथा पनसा (cid:14) – अमृतसर 400 के.वी. डी/सी िvवन मूज लाइन क योजना बनाई गई ह।ै ए@ल ेन डुहगं म तथा मलाना-।। क समय-सीमा के अदं र पनसा(cid:14) 400/220 के.वी. पूDलग (cid:9)ट ेशन क आव(cid:29)य कता होगी। यह समय-सीमा एक अनुकूल न होन े से एडीएचपीएल Pारा ए@ल ने डुहगं न स े नालागढ़ तक एक 220 के.वी. डी/सी सीधी लाइन का िनमा(cid:14)ण 'कया जा रहा ह।ै इस लाइन म(cid:25) 1xजे|ा कंड\ट र के साथ 400 मेगावाट ,मता होगी, िजससे मालाना-।। का िव(cid:17)ुत िन_क ष(cid:14)ण भी 'कया जा सकेगा। स"ज स े िव(cid:17)तु िन_क ष(cid:14)ण वाया पारबती-।।।, 400 के.वी. Pारा 'कया जाना (cid:19)(cid:9)त ािवत ह।ै इस हते ु स"ज म (cid:25) या तो 400 के.वी. का सीधा सेट-अप हो अथवा 400/132 के.वी. का इसका अपना सब (cid:9)ट ेशन। चेनाब म(cid:25) (cid:19)(cid:9)त ािवत टांडी 220 के.वी. पूDलग (cid:9)टेशन से (cid:19)ाOत होने वाली िव(cid:17)ुत को पूल करने हते ु पनसा (cid:14) म(cid:25) 400/220 के.वी. पूDलग (cid:9)ट ेशन क 'फर भी आव(cid:29)यकता होगी। चूँ'क टšडी स े आने आने वाली लाइन काफ ऊँचाई पर होगी, इसिलए कुछ (cid:9)थ ान% पर केिबल क भी आव(cid:29)य कता होगी। अत: 400 के.वी. के (cid:9)थ ान पर 220 के.वी. लाइन का िवक@प बेहतर होगा। 220 के.वी. लाइन(cid:25) उqच कंड\ट र मानक यथा- \व ाड मूज कंड\ट र सिहत 220 के.वी. डी/सी पर होनी चािहए। 8.7 अअअअ,,,,णणणणााााचचचचलललल (cid:11)(cid:11)(cid:11)(cid:11)ददददशशशशेेेे मममम (cid:19)(cid:19) (cid:19)(cid:19)जजजजलललल ििििववववRRRRततुुततुु पपपप????ररररययययोोोोजजजजननननाााा<<<< सससस ेे ेेििििववववRRRRततततुुुु ---- ििििननननPPPPकक कक षषषषणण(cid:8)(cid:8)णण(cid:8)(cid:8) हहहहततेेततेे ुु ुुममममहहहहााााययययोोोोजजजजननननाााा 8.7.1 अअअअ,,,,णणणणााााचचचचलललल (cid:11)(cid:11)(cid:11)(cid:11)ददददशशशशेेेे मममम (cid:19)(cid:19) (cid:19)(cid:19) बबबबििेेििेे ससससनननन----ववववाााारररर उउउउ9999पप पप ााााददददनननन (cid:15)(cid:15)(cid:15)(cid:15)ममममतततताााा :::: अ)णाचल (cid:19)दशे म(cid:25) आगामी वषi म (cid:25) लगभग 37,600 मेगावाट जल िव(cid:17)तु ,मता को िचि—नत 'कया गया ह।ै इसम(cid:25) स े 12व8 पचं वष]य योजना के अंत तक लगभग 2700 मेगावाट तथा 13व8 पंचवष]य योजना एव ं इसके बाद लगभग 35000 मेगावाट क विृ - संभािवत ह।ै इन उ(cid:2)प ादन प(cid:27)रयोजना(cid:31) को िनजी/सरकारी ,े9 Pारा तैयार 'कया जा सकता ह।ै बेिसन-वार िचि—नत ,मता िन€न िलिखत ह ै :- (cid:15)म बेिसन का नाम (cid:9)थ ािपत ,मता (मेगावाट म(cid:25)) 1 vवांग 2773 2 कामे(ग 3892 3 सुबंिसरी 8865 4 िसयांग 6939 5 लोिहत 6632 6 िडबंग 8508780 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 8888....7777....2222 जजजजााााररररीीीी पपपप????ररररययययोोोोजजजजननननाााा<<<< अअअअथथथथाााातत(cid:8)(cid:8)तत(cid:8)(cid:8) ललललोोोोअअअअरररर ससससबबुुबबुु ििंंििंं ससससररररीीीी एएएएचचचचईईईईपपपपीीीी ((((2222000000000000 ममममगगेेगगेे ााााववववााााटटटट)))) एएएएवववव ंं ंं ककककाााामममम(cid:19)ग(cid:19)ग(cid:19)ग(cid:19)ग एएएएचचचचईईईईपपपपीीीी ((((666600000000 % ममममेगेगेगेगााााववववााााटटटट)))) सससस ेे ेेजजजजड़ड़ुुड़ड़ुु ीीीी WWWWईईईई पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी अ)णाचल (cid:19)दशे म(cid:25) लोअर सुबंिसनी एचईपी एवं काम(cid:25)ग एचईपी तथा भूटान म(cid:25) जल िव(cid:17)तु प(cid:27)रयोजना(cid:31)-पुनातसा(च ू-। (1200 मेगावाट), पुनातसा(च ू-।। (990 मेगावाट) एवं मांगदचे ू (720 मेगावाट) से िव(cid:17)ुत-िन_क षण(cid:14) हते ु पारेषण (cid:19)णाली को Šय ापक तरीके स े तैयार 'कया गया था। इन प(cid:27)रयोजना(cid:31) से उ(cid:2)त री एव ं पिdमी ,े9% को िव(cid:29)व नाथ च(cid:27)रय@ल ी से आगरा तक + 800 के.वी., 600 मेगावाट एचवीडीसी बाइपोल लाइन से िव(cid:17)ुत िन_क ष(cid:14)ण 'कया जाएगा। लोअर सुबंिसनी एचईपी के काय(cid:14) म(cid:25) िवलंब होन े से एचवीडीसी बाइपोल के '(cid:15)या(व यन को (cid:9)थ िगत करना पड़ा। वत(cid:14)तान म(cid:25) 1971 'कमी. एचवीडीसी लाइन का िनमा(cid:14)ण काय(cid:14) (cid:19)गित पर ह ै तथा िवVनाथ च(cid:27)रय@ल ी (3000 मेगावाट), अलीपुरPार (3000 मेगावाट) और आगरा (6000 मेगावाट) म(cid:25) कनवट(cid:14)र ट*मनल% के िनमा(cid:14)ण क (cid:9)व ीकृित भी दी जा चकु ह।ै पारेषण (cid:19)णाली का '(cid:15)या(व यन पावरि>ड Pारा 'कया जा रहा ह ै तथा इस योजना पर ). 11,130 करोड़ लागत आने का अनुमान ह।ै जल िव(cid:17)ुत प(cid:27)रयोजनाए ं चालू 'कए जाने के समय तक इस योजना को भी चाल ू 'कए जाने क संभावना ह।ै इस पारेषण (cid:19)णाली का िव(cid:9)त ृत िववरण िन€न िलिखत ह ै : क. पूवyत् त र–उ(cid:2)त री/पिdमी इंटरकने\ट र-। • िव(cid:29)व नाथ च(cid:27)रय@ल ी-आगरा + 800 के.वी., 6000 मेगावाट एचवीडीसी बाईपोल लाइन • बालीपाड़ा - 400 के.वी. डी/सी लाइन • िव(cid:29)व नाथ च(cid:27)रय@ल ी म(cid:25) रंगानदी – बालीपाड़ा 400 के.वी. डी/सी लाइन का एलआईएलओ • िव(cid:29)व नाथ च(cid:27)रय@ल ी -िव(cid:29)व नाथ च(cid:27)रय@ल ी (एईजीसीएल) 132 के.वी. डी/सी लाइन • िव(cid:29)व नाथ च(cid:27)रय@ल ी म(cid:25) 2x200 एम.वी.ए. 400/132 के.वी. सब (cid:9)ट ेशन • ekM~~;wy िव(cid:29)व नाथ च(cid:27)रय@ल ी म(cid:25) एवीडीसी 3000 मेगावाट रे\ट ीफायर तथा आगरा म (cid:25) 3000 मेगावाट इनवरटर मा‘ूल • आगरा म(cid:25) 1x315 एम.वी.ए. 400/220 के.वी. सब (cid:9)ट ेशन (संवध(cid:14)न) ख. काम(cid:25)ग एचईपी से िव(cid:17)ुत के त(cid:2)क ाल िन_क ष(cid:14)ण हते ु पारेषण (cid:19)णाली • काम(cid:25)ग-बालीपाड़ा 400 के.वी. डी/सी लाइन • बालीपाड़ा-ब%गईगšव 400 के.वी. डी/सी लाइन (\व ाड), 30 % 'फ\(cid:9) ड िसरीज कंपेनसेशन • िमसा म(cid:25) िPतीय 315 एम.वी.ए. 400/220के.वी. आईसीटी ग. लोअर सुबंिसरी एचईपी से िव(cid:17)ुत के त(cid:2)क ाल िन_क षण(cid:14) हते ु पारेषण (cid:19)णाली • लोअर सुबंिसरी िव(cid:29)व नाथ च(cid:27)रय@ल ी िvवन लैपDवग कंड\ट र के साथ 400 के.वी. 2xडी/सी % 8888....7777....3333 ममममहहहहााााययययोोोोजजजजननननाााा ककककाााा ििििववववककककाााासससस क(cid:25)Fीय िव(cid:17)ुत (cid:19)ािधकरण (सीईए) ने अ)णाचल (cid:19)दशे म(cid:25) िविभ(न (cid:19)(cid:9)त ािवत जल िव(cid:17)तु प(cid:27)रयोजना(cid:31) स े िव(cid:17)ुत-िन_क ष(cid:14)ण हते ु नदी बेिसन महायोजना तैयार क ह।ै यह महायोजना अ)णाचल (cid:19)दशे म(cid:25) जल¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 781 िव(cid:17)ुत प(cid:27)रयोजना(cid:31) स े िव(cid:17)ुत िन_क ष(cid:14)ण को सुदढ़ृ बनाने हते ु न8व का काय (cid:14) करेगी। योजनागत पारेषण (cid:19)णाली म(cid:25) मुZय तया तीन भाग होते ह।" iiii.... 'कसी एक उ(cid:2)प ादन (cid:9)ट ेशन से िनकटतम बेिसन-वार पूDलग (cid:9)ट ेशन/(cid:9)ट ेशन% को िव(cid:17)ुत अंतरण हते ु त(cid:2)क ाल िन_क ष(cid:14)ण (cid:19)णाली। iiiiiiii.... A बेिसन पूDलग (cid:9)ट ेशन/(cid:9)ट ेशन% से बड़ े पूDलग (cid:9)ट ेशन% के िलए साझा पारेषण (cid:19)णाली iiiiiiiiiiii.... अ(य ,9े % म (cid:25)एचवीडीसी/ईएचवीएसी लाइन% Pारा अप,े ाकृत बड़ ेपDू लग (cid:9)ट शे न स ेलोड के(F % A को िव(cid:17)ुत पारेषण 'कसी नदी बेिसन म(cid:25) िचि—नत उ(cid:2)प ादन प(cid:27)रयोजना(cid:31) हते ु पारेषण (cid:19)णाली के (cid:19)थम दो भाग म(cid:25)- 220 के.वी. अथवा 400 के.वी. ईएचवीएसी शािमल ह।" इसके तीसरे भाग म(cid:25) ऐसी (cid:19)णाली आती है, जो अिधक बड़ े पूDलग (cid:9) टेशन% से (जो कुल 5000-7000 मेगावाट ,मता क प(cid:27)रयोजना(cid:31) को पूल करेगी) से अ(य ,े9 के के(F % को लोड करेगी। यह (cid:19)णाली अभी भी आयोजना के चरण म(cid:25) ह।ै ऐसी (cid:19)णाली म(cid:25) मूलतया नवीनतम एचवीडीसी तकनीकयु\त उqच ,मता वाली लंबी दरू ी क पारेषण (cid:19)ाणाली शािमल ह।" चूँ'क अिधकांश उ(cid:2)प ादन प(cid:27)रयोजनाए ं जैस-े 37000 मेगावाट म(cid:25) से 34000 मेगावाट वष(cid:14) 2017 से 2030 के बीच तैयार होने क संभावना ह,ै इसिलए लंबी दरू ी तक िव(cid:17)ुत-पारेषण एवं मागा(cid:14)िधकार (राइट-आफ-वे) को इ_ट तम बनाने हते ु उस समय तक उपलNध नवीनतम (cid:19)ौ(cid:17)ोिगक का उपयोग करते #ए यह योजना बनाई जानी होगी। अअअअ,,,,णणणणााााचचचचलललल (cid:11)(cid:11)(cid:11)(cid:11)ददददशशशशेेेे मममम (cid:19)(cid:19) (cid:19)(cid:19) ििििववववििििभभभभ1111नन नन ननननददददीीीी बबबबििेेििेे ससससनननन पपपप????ररररययययोोोोजजजजननननाााा<<<< ससससााााझझझझाााा पपपपााााररररेेेेषषषषणणणण ममममहहहहााााययययोोोोजजजजननननाााा ििििचचचच(cid:17)(cid:17)(cid:17)(cid:17) 8888....00007777 मममम (cid:19)(cid:19) (cid:19)(cid:19) (cid:11)(cid:11)(cid:11)(cid:11)ददददTTTTशशशशतततत हहहह।।ैै।।ैै जो उ(cid:2)प ादक अपनी प(cid:27)रयोजना(cid:31) के िव(cid:17)ुत िन_क ष(cid:14)ण हते ु अंतरा3(cid:14) य ीय पारेषण (cid:19)णाली का उपयोग करना चाहत े ह," उ(ह (cid:25) ि>ड कनेि\टिवटी एवं सीईआरसी िनयमावली के अंतगत(cid:14) तथा लंबी अविध उपयोग (लांग टम(cid:14) ए\स ेस/एलटीए) के िलए क(cid:25)Fीय पारेषण कंपनी (स(cid:25)[ल [ांसिमशन यू(cid:27)टिलटी/सीटीयू) से संपक(cid:14) करना होगा। जल िव(cid:17)तु उ(cid:2)प ादक कंपनी को एलटीए क अनुमित िमल जाने पर उ( ह (cid:25) लंबी अव िध उपयोग अनुबंध (लांग टम(cid:14) ए\स ेस ए>ीम(cid:25)ट/एलटीएए) पर ह(cid:9)त ा,र करना होगा तथा सीटीयू को अपेि,त बक" गारंटी दने ी होगी। तदोपरातं िचि—नत पारेषण (cid:19)णाली पर '(cid:15)या(व यन 'कया जाता ह।ै इस (cid:19)कार महायोजना म(cid:25) िचि—नत िविभ(न पारेषण (cid:19)णाली, संब- उ(cid:2)प ादक प(cid:27)रयोजना क आव(cid:29)य कता तथा योजना के अनुसार '(cid:15)याि(वत क जाएगी।782 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ििििचचचच(cid:17)(cid:17)(cid:17)(cid:17) 8888....00007777 8888....7777....4444 ललललोोोोििििहहहहतततत बबबबििेेििेे ससससनननन मममम (cid:19)(cid:19) (cid:19)(cid:19)पपपप????ररररययययोोोोजजजजननननाााा हहहहततेेततेे ुु ुुपपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी :::: कककक :::: जजजजलललल ििििववववRRRRततुुततुु पपपप????ररररययययोोोोजजजजननननााााएएएए,,ंं,,ंं ििििजजजज1111हह हह ''''नननन ेे ेेककककननननििेेििेे \\\\टटटटििििववववटटटटीीीी////एएएएललललटटटटीीीीएएएए ककककेेेे ििििललललएएएए ससससीीीीटटटटीीीीयययय ूू ूूककककोोोो आआआआववववददेेददेे नननन (cid:20)(cid:20)(cid:20)(cid:20)ददददययययाााा हहहह ैै ैै अ)णाचल (cid:19)दशे के लोिहत बेिसन म(cid:25) जल िव(cid:17)ुत प(cid:27)रयोजना िवकस हते ु िन€न िलिखत उ(cid:2)प ादक% ने ि>ड कनेि\टिवटी/लंबी अविध के उपयोग (एलटीए) के िलए सीटीयू को आवेदन 'दया ह ै : >म प(cid:10)रयोजना का उ8 पादक का नाम (cid:21)थ ािपत (cid:26)मता एलटीए/कनेि1टिवटी नाम (मेगावाट म)# (मेगावाट म)# 1 लोअर डेC व े एथेना डेCव े पावर 5x342+1x40=1750 1750 िलिमटेड ययययोोोोगगगग ––––कककक 1111777755550000 1111777755550000¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 783 खखखख :::: अअअअिििितततत????रररर\\\\तत तत जजजजलललल ििििववववRRRRततततुुुु पपपप????ररररययययोोोोजजजजननननााााएएएए ंं ंं :::: लोिहत बेिसन स े पारेषण (cid:19)णाली िवकिसत करत े समय िन€न िलिखत अित(cid:27)र\त जल िव(cid:17)ुत प(cid:27)रयोजना(cid:31) पर भी िवचार 'कया गया : >म प(cid:10)रयोजना का नाम उ8प ादक का नाम (cid:21)थ ािपत (cid:26)मता la- (मेगावाट म)# डेC य ू अपर एथेना एनजW वे=च र (लोिहत ऊजा)(cid:8) 1. 1080 कलई-II कलई पावर Dाइवेट िलिमटेड 2. 1200 ((cid:10)रलायंस पावर िमिमटेड) हौतंग-II माउंटेन फाल इंिडया Dाइवेट िलिमटेड 3. 1250 कलई -I माउंटेन फाल इंिडया िलिमटेड 4. 1352 योग – ख 4444888888882222 योग (क+ख) 6666666633332222 गगगग :::: पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी :::: जल िव(cid:17)ुत प(cid:27)रयोजना(cid:31) स े ि़व(cid:17)ुत नामसी पूDलग Oव ाइंट पर पूल क जाएगी, जहाँ से दशे के अ(य ,े9% म(cid:25) एचवीडीसी बाइपोल लाइन Pारा + 800 के.वी. 7000 मेगावाट स े अिधक िव(cid:17)ुत का िन_क ष(cid:14)ण 'कया जाएगा। लोिहत बेिसन से िव(cid:17)ुत-िन_क ष(cid:14)ण अिधक िव(cid:29)व सनीय बनान े हते ु नामसी को )पई पूDलग Oव ाइंट, 400 के.वी. डी/सी एचटीएलएस ए.सी. लाइन से अंतर-संयोिजत 'कया जाएगा। €य ांमार क जल िव(cid:17)ुत प(cid:27)रयोजना(cid:31) से िव(cid:17)ुत को )पई पूDलग Oव ाइंट पर पूल 'कये जाने क योजना ह,ै जहाँ से दशे के अ(य ,े9% के िलए एक + 800 के.वी. एचवीडीसी (7000 मेगावाट) बाईपोल लाइन भी (cid:19)(cid:9)त ािवत ह।ै 8888....7777....5555 ििििडडडडबबबबगगंंगगंं बबबबििेेििेे ससससनननन मममम (cid:19)(cid:19)(cid:19)(cid:19)पपपप????ररररययययोोोोजजजजननननाााा<<<< हहहहततेेततेे ुु ुुपपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी : कककक:::: जजजजलललल पपपप????ररररययययोोोोजजजजननननााााएएएए,,ंं,,ंं ििििजजजजननननकककक.... ककककननननििेेििेे \\\\टटटटििििववववटटटटीीीी////एएएएललललटटटटीीीीएएएए ककककेेेे ििििललललएएएए ससससीीीीटटटटीीीीयययय ूू ूूककककोोोो आआआआववववददेेददेे नननन (cid:20)(cid:20)(cid:20)(cid:20)ददददययययाााा गगगगययययाााा अ)णाचल (cid:19)दशे के िडबंग बेिसन म(cid:25) ि>ड कनेि\टिवटी/लंबी अविध के उपयोग (एलटीए) के िलए 'कसी जल िव(cid:17)ुत उ(cid:2)प ादक ने अब तक सीटीयू को आवेदन नह8 'दया ह।ै खखखख :::: अअअअिििितततत????रररर\\\\तत तत जजजजलललल ििििववववRRRRततततुुुु पपपप????ररररययययोोोोजजजजननननााााएएएए ंं ंं :::: िडबंग बेिसन से पारेषण (cid:19)णाली िवकिसत करते समय िन€न िलिखत अित(cid:27)र\त जल िव(cid:17)ुत प(cid:27)रयोजना(cid:31) पर भी िवचार 'कया गया : (cid:15)म प(cid:27)रयोजना का उ(cid:2)प ादक का नाम (cid:9)थ ािपत ,मता (मेगावाट म(cid:25)) la- नाम 1. िडबंग एनएचपीसी 3000 2. ईिमनी ईिमनी हाइ~ो पावर (cid:19)ाइवेट िलिमटेड 500 ((cid:27)रलायंस एनज] िलिमटेड )784 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] (cid:15)म प(cid:27)रयोजना का उ(cid:2)प ादक का नाम (cid:9)थ ािपत ,मता (मेगावाट म(cid:25)) la- नाम 3. िम#€ड न िम#€ड न हाइ~ो पावर (cid:19)ाइवेट 400 िलिमटेड ((cid:27)रलायंस एनज] िलिमटेड) 4. िसि(cid:9)सरी सोमा िसि(cid:9)सरी हाइ~ो पावर (cid:19)ाइवेट 1352 िलिमटेड (सोमा इंटर(cid:19)ाइज िलिमटेड) 5. ए€र ा-II एथेना एनज] वे(च र 216 6. अमूिलन अमूिलन हाइ~ो पावर (cid:19)ाइवेट 420 िलिमटेड ((cid:27)रलायंस एनज] िलिमटेड) 7. ए€र ा-I एथेना एनज] वे(च र 275 8. एतािलन Dजदल पावर िलिमटेड 3097 9. अ(cid:2)त ु(ल ी Dजदल पावर िलिमटेड 500 योग – ख 8888555500008888 योग (क+ख) 8888555500008888 गगगग:::: पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी :::: िडबंग एवं एतिल न को छोड़कर जल प(cid:27)रयोजना(cid:31) स े िव(cid:17)ुत अनीनी सब-(cid:9)ट ेशन पर पूल क जाएगी। िडबंग एवं एतिल न जल प(cid:27)रयोजना(cid:31) के साथ-साथ अनीनी सब-पूDलग Oव ाइंट क िव(cid:17)ुत दमबक म(cid:25) पूल क जाएगी, जो एक बड़ा पूDलग Oव ाइंट ह।ै वहाँ स े + 800 के.वी. 7000 मेगावाट एचवीडीसी बाईपोल लाइन से दशे के अ(य ,े9% के िलए िव(cid:17)ुत का िन_क ष(cid:14)ण 'कया जाएगा। अनीनी पावर Oव ांइट को दमबक पूDलग Oव ाइंट से 400 के.वी. डी/सी लाइन एचटीएलएस कंड\ट र के साथ संयोिजत (कने\ट ) 'कया जाएगा। इस बेिसन स े शेष िव(cid:17)ुत- िन_क ष(cid:14)ण के िलए दमबक पूDलग Oव ाइंट को )पई पDू लग Oव ाइंट से 400 के.वी. 2xडी/सी एचटीएलएस लाइन% पर अतं र-संयोिजत 'कया जाएगा। 8888....7777....6666 ििििससससययययाााागगंंगगंं बबबबििेेििेे ससससनननन मममम (cid:19)(cid:19) (cid:19)(cid:19)पपपप????ररररययययोोोोजजजजननननाााा<<<< हहहहततेेततेे ुु ुुपपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी :::: कककक:::: जजजजलललल पपपप????ररररययययोोोोजजजजननननााााएएएए,,ंं,,ंं ििििजजजजननननकककक.... ककककननननििेेििेे \\\\टटटटििििववववटटटटीीीी////एएएएललललटटटटीीीीएएएए ककककेेेे ििििललललएएएए ससससीीीीटटटटीीीीयययय ूू ूूककककोोोो आआआआववववददेेददेे नननन (cid:20)(cid:20)(cid:20)(cid:20)ददददययययाााा गगगगययययाााा अ)णाचल (cid:19)दशे के िसयांग बेिसन म(cid:25) जल िव(cid:17)ुत प(cid:27)रयोजना िवकिसत करने हते ु िन€न िलिखत उ(cid:2)प ादक% ने ि>ड कनेि\टिवटी/लंबी अविध के उपयोग (एलटीए) के िलए सीटीयू को आवेदन 'दया ह ै : (cid:15)म प(cid:27)रयोजना का उ(cid:2)प ादक का नाम (cid:9)थ ािपत ,मता एलटीए/कनेि\टिवटी la- नाम (मेगावाट म(cid:25)) (मेगावाट म(cid:25)) 1. लोअर िसयांग जय(cid:19)काश पावर (cid:19)थम चरण : 2700 वे(च स(cid:14) िलिमटेड 5x300=1500¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 785 (cid:15)म प(cid:27)रयोजना का उ(cid:2)प ादक का नाम (cid:9)थ ािपत ,मता एलटीए/कनेि\टिवटी la- नाम (मेगावाट म(cid:25)) (मेगावाट म(cid:25)) (जेपीवीएल) िPतीय चरण: 4x300=1200 योग = 2700 2. िसयोम (िसयांग िसयोम हाइ~ो 6x166.6=1000 1000 िमडले) पावर (cid:19)ाइवेट िलिमटेड ((cid:27)रलायंस एनज] िलिमटेड) 3. टैटो-II टैटो - II 4x175=700 700 हाइ~ो पावर (cid:19)ाइवेट िलिमटेड ((cid:27)रलायंस एनज] िलिमटेड) 4. नेDयग डी.एस. कंस[\श न 4x250=1000 1000 िलिमटेड 5. टगरिशट एल एडं टी पावर 3x28=84 84 िलिमटेड 6. पौक पौक हाइ~ो पावर 3x48.3=145 145 प(cid:27)रयोजना (वेलकैन एनज] िलिमटेड) 7. हवे ो हवे ो हाइ~ो पावर 3x80=240 240 (cid:19)ोजे\ट 8. टैटो-। िसयोटो हाइ~ो 3x62=186 186 पावर (cid:19)ोजे\ट योग – क 6666000055555555 6666000055555555 खखखख :::: अअअअिििितततत????रररर\\\\तत तत जजजजलललल ििििववववRRRRततततुुुु पपपप????ररररययययोोोोजजजजननननााााएएएए ंं ंं :::: िसयांग बेिसन से पारेषण (cid:19)णाली िवकिसत करत े समय िन€न िलिखत अित(cid:27)र\त जल िव(cid:17)ुत प(cid:27)रयोजना(cid:31) पर भी िवचार-िवमश(cid:14) 'कया गया : (cid:15)म प(cid:27)रयोजना का उ(cid:2)प ादक का नाम (cid:9)थ ािपत ,मता नाम (मेगावाट म(cid:25)) 1. पेमाशे@ पू राजर(cid:2)न ा मेटल इंड(cid:9)[ ीज 90 2. िहर%ग जय(cid:19)काश एसोिसएट्ेस िलिमटेड 500786 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 3. कांगतांगिशरी राजर(cid:2)न ा मेटल इंड(cid:9)[ ीज 80 4. )पम राजर(cid:2)न ा मेटल इंड(cid:9)[ ीज 80 5. िशमंग-I आ'दशंकर पावर (cid:19)ाइवेट िलिमटेड 67 6. िशमंग-II आ'दशंकर पावर (cid:19)ाइवेट िलिमटेड 67 योग – ख 888888884444 योग (क+ख) 6666999933339999 गगगग:::: पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी :::: िसयांग बेिसन म(cid:25) कुछ जल प(cid:27)रयोजना(cid:31) से टैटो सब-पूDलग Oव ाइंट पर िव(cid:17)ुत पूल क जाएगी। टैटो के साथ-साथ पास क अ(य जल प(cid:27)रयोजना(cid:31) क िव(cid:17)ुत भी कामक - एक दसू रे पूDलग Oव ाइंट पर पूल क जाएगी। कामक पूDलग (cid:9)ट ेशन से िव(cid:17)ुत 400 के.वी. ए.सी. लाइन क उqच ,मता Pारा िशलापठार - एक बड़ े पूDलग Oव ाइंट पर लाई जाएगी। लोअर िसयांग प(cid:27)रयोजना स े िव(cid:17)तु िशलापठार म (cid:25) सीध े पूल क जाएगी। वहाँ स े + 800 के.वी. 7000 मेगावाट एचवीडीसी बाईपोल लाइन स े दशे के अ(य ,े9% को िव(cid:17)ुत का िन_क ष(cid:14)ण 'कया जाएगा। पारेषण (cid:19)णाली म(cid:25) (cid:19)चुर मा9ा म (cid:25) िव(cid:17)ुत उपलNध करने के िलए, िशलापठार को िव(cid:29)व नाथ च(cid:27)रय@ल ी एवं )पई के साथ 400 के.वी. डी/सी एचटीएलएस लाइन% पर इंटरकनै\ट 'कया जाएगा। 8888....7777....7777 ससससबबुुबबुु ििंंििंं ससससररररीीीी बबबबििेेििेे ससससनननन मममम (cid:19)(cid:19) (cid:19)(cid:19)पपपप????ररररययययोोोोजजजजननननाााा<<<< हहहहततेेततेे ुु ुुपपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी : कककक:::: ममममौौौौजजजजददूूददूू ाााा पपपप????ररररययययोोोोजजजजननननाााा :::: (cid:15)म प(cid:27)रयोजना का उ(cid:2)प ादक का नाम स् थािपत ,मता la- नाम (मेगावाट म(cid:25)) 1. रंगानादी एनईईपीसीओ 405 योग-क 444400005555 बालीपुरा सब-(cid:9)ट ेशन पर 400 के.वी. डी/सी लाइन पर िव(cid:17)ुत का िन_क ष(cid:14)ण 'कया जाता ह।ै खखखख :::: जजजजााााररररीीीी पपपप????ररररययययोोोोजजजजननननाााा :::: (cid:15)म प(cid:27)रयोजना का उ(cid:2)प ादक का नाम (cid:9)थ ािपत ,मता la- नाम (मेगावाट म(cid:25)) 1. सुबंिसरी लोअर एनएचपीसी 2000 योग-ख 2222000000000000 संब- पारेषण (cid:19)णाली उपरो\त 8.7.2 म(cid:25) दी गई ह।ै % गगगग:::: जजजजलललल पपपप????ररररययययोोोोजजजजननननााााएएएए,,ंं,,ंं ििििजजजजननननकककक.... ककककननननििेेििेे \\\\टटटटििििववववटटटटीीीी////एएएएललललटटटटीीीीएएएए ककककेेेे ििििललललएएएए ससससीीीीटटटटीीीीयययय ूू ूूककककोोोो आआआआववववददेेददेे नननन (cid:20)(cid:20)(cid:20)(cid:20)ददददययययाााा गगगगययययाााा अ)णाचल (cid:19)दशे के सुबंिसरी बेिसन म(cid:25) जल िव(cid:17)तु प(cid:27)रयोजना िवकिसत करने हते ु 'कसी उ(cid:2)प ादक ने ि>ड कनेि\टिवटी/लंबी अविध के उपयोग (एलटीए) के िलए सीटीयू को अब तक आवेदन नह8 'दया ह ै :¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 787 घघघघ:::: अअअअिििितततत????रररर\\\\तत तत जजजजलललल ििििववववRRRRततुुततुु पपपप????ररररययययोोोोजजजजननननााााएएएए ंं ंं िसयांग बेिसन से पारेषण (cid:19)णाली िवकिसत करत े समय िन€न िलिखत अित(cid:27)र\त जल िव(cid:17)ुत प(cid:27)रयोजना(cid:31) पर भी िवचार 'कया गया : (cid:15)म प(cid:27)रयोजना का उ(cid:2)प ादक का नाम (cid:9)थ ािपत ,मता la- नाम (मेगावाट म(cid:25)) 1. सुबंिसरी िमिडल Dजदल पावर िलिमटेड 1600 2. सुबंिसरी अपर केएसके एनज] वे(च स(cid:14) िलिमटेड 1800 3. नाबा आबीर इ((cid:127) ास[\च र (cid:19)ाइवेट 1000 िलिमटेड 4. नालो को(cid:9)ट ल इ((cid:127) ास[\च र (cid:19)ाइवेट 360 िलिमटेड 5. ओजू-II नवयु्ग एनज] कंपनी िलिमटेड 1000 6. आजू-I नवयु्ग एनज] कंपनी िलिमटेड 700 योग-‘घ’ का 6666444466660000 योग-(क+ख+ग+घ) 8888888866665555 चचचच :::: पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी :::: सुबंिसरी बेिसन म(cid:25), सुबंिसरी िमिडल को छोड़कर, जल प(cid:27)रयोजना(cid:31) से िव(cid:17)तु डापो(cid:27)रजो पूDलग Oव ाइंट पर पूल क जाएगी तथा सुबिं सरी िमिडल से सुबंिसरी लोअर म(cid:25) िव(cid:17)तु पूल क जाएगी। डापो(cid:27)रजो पूDलग Oव ाइंट से 400 के.वी. 2xडी/सी एचटीएलएस लाइन% से िव(cid:17)तु (य ू ईटानगर पूDलग Oव ाइंट पर लाई जाएगी, जहाँ से + 800 के.वी. 7000 मेगावाट एचवीडीसी बाईपोल लाइन स े दशे के अ(य ,े9% को िव(cid:17)ुत का िन_क ष(cid:14)ण 'कया जाएगा। इसके अित(cid:27)र\त सबु ंिसरी लोअर-िव(cid:29)व नाथ च(cid:27)रय@ल ी 400 के.वी. 2xडी/सी क एक लाइन को ईटानगर म(cid:25) लूप इन तथा लूप आउट 'कया जाएगा। 8888....7777....8888 काम(cid:25)ग बेिसन म(cid:25) प(cid:27)रयोजना(cid:31) हते ु पारेषण (cid:19)णाली : कककक :::: (cid:11)(cid:11)(cid:11)(cid:11)गगगगििििततततगगगगााााममममीीीी जजजजलललल ििििववववRRRRततुुततुु पपपप????ररररययययोोोोजजजजननननाााा :::: (cid:15)म प(cid:27)रयोजना का उ(cid:2)प ादक का नाम (cid:9)थ ािपत ,मता la- नाम (मेगावाट म(cid:25)) 1. काम(cid:25)ग एनईईपीसीओ 600 योग – क 666600000000 संब- पारेषण (cid:19)णाली उपरो\त 8.7.2 म(cid:25) दी गई ह।ै788 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] खखखख :::: जजजजलललल ििििववववRRRRततुुततुु पपपप????ररररययययोोोोजजजजननननााााएएएए,,ंं,,ंं ििििजजजजननननकककक.... ककककननननििेेििेे \\\\टटटटििििववववटटटटीीीी////एएएएललललटटटटीीीीएएएए ककककेेेे ििििललललएएएए ससससीीीीटटटटीीीीयययय ूू ूूककककोोोो आआआआववववददेेददेे नननन (cid:20)(cid:20)(cid:20)(cid:20)ददददययययाााा गगगगययययाााा अ)णाचल (cid:19)दशे के िसयांग बेिसन म(cid:25) जल िव(cid:17)ुत प(cid:27)रयोजना िवकिसत करने हते ु िन€न िलिखत उ(cid:2)प ादक% ने ि>ड कनेि\टिवटी/लंबी अविध के उपयोग (एलटीए) के िलए सीटीयू को आवेदन 'दया ह ै : (cid:15)म प(cid:27)रयोजना का नाम उ(cid:2)प ादक का नाम (cid:9)थ ािपत ,मता एलटीए/कनेि\टिवटी la- (मेगावाट म(cid:25)) (मेगावाट म(cid:25)) 1. िडिNबन केएसके िडिNबन हाइ~ो 2x60=120 120 पावर (cid:19)ाइवेट िलिमटेड 2. i) ग%गरी पटेल हाइ~ो (cid:19)ाइवेट 3x48=144 273 िलिमटेड ii) ससकंग र%ग 2x22.5=45 iii) मेयंग 2x19=38 iv) िडिTगन 2x23=46 3. खुईटम आ'दशंकर खुईटम पावर 3x22 = 66 66 (cid:19)ाइवेट िलिमटेड 4. ने(cid:127)ा एसईडN@ य ू पावर 2x60 = 120 132 कारपोरेशन िलिमटेड 5. i) पचूक -I एनज] डवे लपम(cid:25)ट कंपनी 84 391 िलिमटेड (ईडीसीएल) ii) पचूक -II 60 iii) पचूक -II (एल) 45 iv) मारDगTल ा 60 v)मारDगTल ा (एल) 48 vi) प\क े-I 40 vii) प\क े -II 15 viii) प\क े -III 24 ix) प\क े -IV 15 6. ताल%ग (ल%दा) जीएमआर ल%दा हाइ~ो 3x75 = 225 225 पावर (cid:19)ाइवेट िलिमटेड योग-ख 1111111199995555 1111222200007777 गगगग :::: अअअअिििितततत????रररर\\\\तत तत जजजजलललल पपपप????ररररययययोोोोजजजजननननााााएएएए ंं ंं िसयांग बेिसन से पारेषण (cid:19)णाली िवकिसत करत े समय िन€न िलिखत अित(cid:27)र\त जल िव(cid:17)ुत प(cid:27)रयोजना(cid:31) पर भी िवचार 'कया गया :¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 789 >म प(cid:10)रयोजना का नाम उ8 पादक का नाम (cid:21)थ ािपत (cid:26)मता (मेगावाट म)# la- 1. रेE बी को(cid:21)ट ल Dोजे1Z स िलिमटेड 31 2. पाड़ा को(cid:21)ट ल Dोजे1Z स िलिमटेड 55 3. बदाओ को(cid:21)ट ल Dोजे1Z स िलिमटेड 70 4. लोचुंग को(cid:21)ट ल Dोजे1Z स िलिमटेड 41 5. पंचुंग (पाची) इंिडयाबुल (cid:10)रयल इ(cid:21)ट ेट िलिमटेड 56 6. िपचंग इंिडयाबुल (cid:10)रयल इ(cid:21)ट ेट िलिमटेड 12 7. तारंग वारंग इंिडयाबुल (cid:10)रयल इ(cid:21)ट ेट िलिमटेड 36 8. पापू इंिडयाबुल (cid:10)रयल इ(cid:21)ट ेट िलिमटेड 90 9. सेJ ला इंिडयाबुल (cid:10)रयल इ(cid:21)ट ेट िलिमटेड 21 10. उटुंग केएसके एनजW वे=च र Dाइवेट िलिमटेड 100 11. काम#ग डैम केएसके एनजW वे=च र Dाइवेट िलिमटेड 480 12. िडिमिजन केएसके एनजW वे=च र Dाइवेट िलिमटेड 20 13. िडनचंग केएसके एनजW वे=च र Dाइवेट िलिमटेड 360 14. जामेरी केएसके एनजW वे=च र Dाइवेट िलिमटेड 90 15. काम#ग ।। (भारेली) माउंटेन फाल इंिडया Dाइवेट िलिमटेड 600 16. पापू वैली वे= सर क=स [1श न कंपनी Dाइवेट 35 िलिमटेड योग – ग 2222000099997777 योग (क+ख+ग) 3333888899992222 घघघघ:::: पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी :::: काम(cid:25)ग बेिसन म(cid:25) एनज] डवे लपम(cid:25)ट कंपनी िलिमटेड (ईडीसीएल) क नौ िव(cid:17)ुत प(cid:27)रयोजना(cid:31) से िव(cid:17)तु , ईडीसीएल सब-पूDलग (cid:9)ट ेशन पर पूल क जाएगी। काम(cid:25)ग बेिसन के पिdमी ,े9 म(cid:25) जल प(cid:27)रयोजना(cid:31) से िव(cid:17)ुत Dडचांग पूDलग Oव ाइंट पर पूल क जाएगी। काम(cid:25)ग बेिसन के उ(cid:2)त री ,े9 तथा ईडीसीएल सब पूDलग Oव ाइंट से िव(cid:17)ुत ताल%ग पूDलग Oव ाइंट पर पूल क जाएगी। ताल%ग पूDलग Oव ाइंट तथा काम(cid:25)ग बेिसन के दि,ण-पूव] भाग म(cid:25) जल प(cid:27)रयोजना(cid:31) से िव(cid:17)ुत दि,ण काम(cid:25)ग पूDलग Oव ाइंट पर पूल क जाएगी। इसके अित(cid:27)र\त Dडचांग पूDलग O वाइंट से 400 के.वी. \व ाड डी/सी लाइन से िव(cid:17)ुत रांिगया/रौटा पूDलग Oव ाइंट पर लाई जाएगी। वहाँ स े + 800 के.वी. 7000 मेगावाट एचवीडीसी बाईपोल लाइन से दशे अ(य ,े9% को िव(cid:17)ुत का िन_क षण(cid:14) 'कया जाएगा। दि,ण काम(cid:25)ग पूDलग Oव ाइंट से िव(cid:17)ुत 400 के.वी. डी/सी एचटीएलएस लाइन से िव(cid:29)व नाथ च(cid:27)रय@ल ी लाई जाएगी। िव(cid:29)व नाथ च(cid:27)रय@ल ी म(cid:25) क(व ट(cid:14)र ट*मनल क ,मता बढ़ाकर 6000 मेगावाट क जाएगी तथा आगरा तक एचवीडीसी लाइन के एलआईएलओ को अलीपुरPार ट*मनल पर पृथक 'कया जाएगा।790 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 8.7.9 nnnnववववाााागगंंगगंं बबबबििेेििेे ससससनननन मममम (cid:19)(cid:19) (cid:19)(cid:19)पपपपररररययययोोोोजजजजननननाााा<<<< हहहहततेेततेे ुु ुुपपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी:::: कककक:::: जजजजलललल पपपप????ररररययययोोोोजजजजननननााााएएएए,,ंं,,ंं ििििजजजजननननकककक.... ककककननननििेेििेे \\\\टटटटििििववववटटटटीीीी////एएएएललललटटटटीीीीएएएए ककककेेेे ििििललललएएएए ससससीीीीटटटटीीीीयययय ूू ूूककककोोोो आआआआववववददेेददेे नननन (cid:20)(cid:20)(cid:20)(cid:20)ददददययययाााा गगगगययययाााा अ)णाचल (cid:19)दशे के vवांग बेिसन म(cid:25) जल िव(cid:17)तु प(cid:27)रयोजना िवकिसत करने हते ु िन€न िलिखत उ(cid:2)प ादक% न े ि>ड कनेि\टिवटी/लंबी अविध के उपयोग (एलटीए) के िलए सीटीयू को आवेदन 'दया ह ै : >म प(cid:10)रयोजना का नाम उ8 पादक का नाम (cid:21)थ ािपत (cid:26)मता एलटीए/कनेि1टिवटी la- (मेगावाट म)# (मेगावाट म)# 1. = यामजंग च ू भीलवाड़ा एनजW 6x130 = 780 780 िलिमटेड 2. i) टाशू -I एनजW डेवलपम#ट कंपनी 3x8=24 164 िलिमटेड (ईडीसीएल) ii) टाशू -I (एल) 3x16.6=50 iii) टाशू -II 3x30=90 3. Zवांग-I एनएचपीसी िलिमटेड 3x200=600 660 (ओवर लोड सिहत) 4. Zवांग II एनएचपीसी िलिमटेड 4x200=800 880 (ओवर लोड सिहत) योग-क 2222333344444444 2222444488884444 खखखख :::: अअअअिििितततत????रररर\\\\तत तत जजजजलललल पपपप????ररररययययोोोोजजजजननननााााएएएए ंं ंं :::: vवांग बेिसन स े पारेषण (cid:19)णाली िवकिसत करत े समय िन€न िलिखत अित(cid:27)र\त जल िव(cid:17)ुत प(cid:27)रयोजना(cid:31) पर भी िवचार 'कया गया : >म प(cid:10)रयोजना का नाम उ8प ादक का नाम (cid:21)थ ािपत (cid:26)मता (मेगावाट म)# la- 1. मागो चू सेउ एनजW िलिमटेड 96 2. िनकचार-गचू सेउ एनजW िलिमटेड 96 3. रहो सेउ एनजW िलिमटेड 141 4. = यू मेFल ी सेउ एनजW िलिमटेड 96 योग – ख 444422229999 योग (क+ख) 2222777777773333 गगगग.... पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी :::: vवांग बेिसन म(cid:25) जल प(cid:27)रयोजना(cid:31) से िव(cid:17)ुत, vवांग पूDलग (cid:9)ट ेशन पर पूल क जाएगी, जहाँ से यह 400 के.वी. डी/सी \व ाड एचटीएलएस लाइन Pारा रांिगया/रौटा के बड़ े पूDलग Oव ाइंट पर पूल क जाएगी।¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 791 रांिगया/रौटा से + 800 के.वी. 7000 मेगावाट एचवीडीसी बाईपोल लाइन Pारा दशे के अ(य ,े9% के िलए िव(cid:17)ुत का िन_क ष(cid:14)ण 'कया जाएगा। रांिगया/रौटा म(cid:25) 400 के.वी. बालीपाड़ा-ब%गईगाँव का एलआईएलओ भी (cid:19)(cid:9)त ािवत ह।ै 8.8 उउउउ9999तत तत रररर पपपपववूूववूू 0000 (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे मममम (cid:19)(cid:19) (cid:19)(cid:19)पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ककककाााा आआआआगगगगााााममममीीीी ििििववववककककाााासससस :::: 13व8 पंचवष]य योजना म(cid:25) उ(cid:2)त र-पूव] ,े9 म(cid:25) बड़ी संZय ा म(cid:25) जल िव(cid:17)तु उ(cid:2)प ादन (cid:9)ट ेशन (cid:9)थ ािपत 'कए जाने क संभावना ह,ै जो उ(cid:2)त र-पूव] ,े9 के संघटक% हते ु िव(cid:17)ुत ऊजा(cid:14) के ब#त बड़ े kोत ह%गे। उ(cid:2)त र पूव] ,े9 के संघटक इन प(cid:27)रयोजना(cid:31) से िव(cid:17)ुत (cid:19)ाOत करते रह,(cid:25) इस हते ु पूवy(cid:2)त र के िजन रा3य % म(cid:25) य े प(cid:27)रयोजनाए ं ि(cid:9)थत ह," वहाँ पारेषण (cid:19)णाली म(cid:25) समुिचत संवध(cid:14)न 'कया जाना होगा। इसिलए यह आव(cid:29)य क ह ै 'क पूवy(cid:2)त र रा3य % म(cid:25) जल िव(cid:17)ुत प(cid:27)रयोजना(cid:31) के िवकास के साथ-साथ (cid:19)णाली का चरणब- ढंग से संवध(cid:14)न 'कया जाए ता'क इस ,े9 का पारेषण नेटवक(cid:14) भी सश\त हो सके। तदनु)प, 13व8 पंचवष]य योजना म(cid:25) पूवy(cid:2)त र ,े9% हते ु अनुमािनत पारेषण (cid:19)णाली सशि(cid:129)करण योजना नीचे दी गई ह ै : (i) रांिगया/रौटा पूDलग (cid:9)ट ेशन – अजारा 400 के.वी. डी/सी लाइन (उqच ,मता) (ii) अजारा-िबन]हाट 400 के.वी. डी/सी लाइन (उqच ,मता) (iii) िबन]हाट-िसलचर 400 के.वी. डी/सी लाइन (उqच ,मता) (iv) िसलचर-सूरजमानीनगर 400 के.वी. डी/सी लाइन (उqच ,मता) (v) सूरजमानीनगर-िमल(cid:27)रयात 400 के.वी. डी/सी लाइन (उqच ,मता) (vi) िमल(cid:27)रयात-इंफाल 400 के.वी. डी/सी लाइन (उqच ,मता) (vii) इंफाल-कोिहमा 400 के.वी. डी/सी लाइन (उqच ,मता) (viii) कोिहमा-मा(cid:27)रयानी 400 के.वी. डी/सी लाइन (उqच ,मता) (ix) मा(cid:27)रयानी-िसलापठार पूDलग (cid:9)ट ेशन 400 के.वी. डी/सी लाइन (उqच ,मता) 8.9 भभभभटटूूटटूू ाााानननन मममम (cid:19)(cid:19) (cid:19)(cid:19)ििििववववRRRRततुुततुु पपपप????ररररययययोोोोजजजजननननाााा<<<< सससस ेे ेेििििववववRRRRततुुततुु ----ििििननननPPPPकक कक षषषषणण(cid:8)(cid:8)णण(cid:8)(cid:8) हहहहततेेततेे ुु ुुससससभभंंभभंं ााााििििववववतततत पपपपााााररररेेेेषषषषणणणण ययययोोोोजजजजननननाााा :::: 8888....9999....1111 (cid:11)(cid:11)(cid:11)(cid:11)////तत तत ााााववववननननाााा भूटान म(cid:25) टाला (1020 मेगावाट), चुखा (336 मेगावाट), कु(cid:27)रच ू (60 मेगावाट) तथा बोसोच-ू । (24 मेगावाट) एवं बोसोचू ।। (40 मेगावाट) क जल िव(cid:17)ुत प(cid:27)रयोजना(cid:31) (एचईपी) को िमलाकर (cid:9)थ ािपत िव(cid:17)ुत उ(cid:2)प ादन क कुल ,मता 1480 मेगावाट ह।ै इन जल िव(cid:17)ुत प(cid:27)रयोजना(cid:31) (एचईपी) से प(cid:27)रमाण म(cid:25) उ(cid:2)प ादन को भूटान क आंत(cid:27)रक िव(cid:17)ुत मांग को पूरा करन े के बाद भारत को िनया(cid:14)त 'कया जाता ह।ै इस िव(cid:17)तु अंतरण हते ु संब- िन_क ष(cid:14)ण (cid:19)णाली तथा सीमापार पारेषण लाइन% को 400 के.वी. तथा 130 के.वी. (cid:9)त र पर िवकिसत 'कया गया ह ै तथा इ(ह (cid:25) भारतीय ि>ड के समानांतर (cid:19)चािलत 'कया जाता ह।ै भूटान क शाही सरकार न े अपने यहाँ जल िव(cid:17)ुत क भारी संभावना को दखे ते #ए वष(cid:14) 2030 तक िविभ(न नदी बेिसन म(cid:25) लगभग 75 नई जल िव(cid:17)तु प(cid:27)रयोजना(cid:31) को िचि—नत 'कया ह।ै वष(cid:14) 2030 तक लगभग 26534 मेगावाट जल िव(cid:17)तु उ(cid:2)प ादन ,मता िवकिसत कर ली जाएगी। इसम(cid:25) स े 10334 मेगावाट उ(cid:2)प ादन हते ु 14 जल िव(cid:17)ुत प(cid:27)रयोजना(cid:31) (एचईपी) को वष(cid:14) 2020 तक '(cid:15)याि(वत करने क योजना बनाई गई ह।ै इनम (cid:25) से पुनातसंगच-ू ।, पुनातसगं चू-।। तथा मंगादचे ू जल िव(cid:17)ुत प(cid:27)रयाजनाए ं िवकिसत 'कए जान े के िविभ(न चरण% म(cid:25) ह " तथा इ(ह (cid:25) 2015 से 2017 के बीच चाल ू 'कए जाने का लeय ह।ै शेष अ(य जल प(cid:27)रयोजनाए-ं संकोष, चामखारचू, िनकाचू, खोलो(च ू, कूरी ग%गरी, अमोचू आर.एस., बुनाखा, वांगचू, िब(द ू खोला एवं दागाचू ह।" भूटान Pारा वष(cid:14) 2020 म(cid:25) 1500 मेगावाट लोड का792 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] पूवा(cid:14)नुमान ह,ै जो वष(cid:14) 2030 तक बढ़कर 2500 मेगावाट हो जाएगा। इस (cid:19)कार भूटान म(cid:25) आगामी िव(cid:17)ुत उ(cid:2)प ादन क अिधकािधक मा9ा भी भारत को िनया(cid:14)त क जाएगी। 8888....9999....2222 पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी,,,, जजजजोोोो (cid:20)(cid:20)(cid:20)(cid:20)(cid:9)(cid:9)(cid:9)(cid:9)ययययाााा1111वव वव ययययनननन ककककेेेे चचचचररररणणणण मममम (cid:19)(cid:19) (cid:19)(cid:19)हहहह ैैैै:::: पुनातसांगच-ू । जल िव(cid:17)ुत प(cid:27)रयोजना (एचईपी) से िव(cid:17)ुत िन_क ष(cid:14)ण हते ु पुनातसांगचू-। से हामोई Dजगखा/संकोष (भारतीय सीमा) तक 400 के.वी. डी/सी िvवन मूज के साथ दो लाइन(cid:25) िजनम(cid:25) स े एक डी/सी लाइन वाया पुनातसांगचू-।। (एचईपी), तैयार 'कए जान े क योजना बनाई गई ह।ै संकोष स े अलीपुरPार, भारतीय पूDलग Oव ाइंट तक 400 के.वी. उqच ,मता क एक डी/सी लाइन (\व ाड मूज कंड\ट र) का िनमा(cid:14)ण 'कया जाएगा और जब तक हामोई Dजगखा/संकोष 400 के.वी. ि(cid:9)वचयाड (cid:14) तैयार नह8 हो जाता, तब तक (cid:19)ारंिभक चरण म(cid:25) इसे पुनातसांगचू-। जल िव(cid:17)ुत प(cid:27)रयोजना (एचईपी) के दो डी/सी िvवन मूज लाइन से अंतर-संयोिजत 'कया जाएगा। पुनातसांगच-ू । एवं ।। से िव(cid:17)ुत आयात हते ु अलीपुरPार पर ± 800 के.वी., 3000 मेगावाट क(व ट(cid:14)र मा‘ूल का एक एचवीडीसी (cid:9)ट ेशन एवं 2x315 एमवीए, 400/220 के.वी. ईएचवीएसी सब-(cid:9)ट ेशन िन*मत 'कए जान े क योजना बनाई गई ह।ै ± 800 के.वी., 6000 मेगावाट िव(cid:29) वनाथ च(cid:27)रय@ल ी (एनईआर)-आगरा (एनआर) एचवीडीसी बाई-पोल लाइन, 3000 मेगावाट क(व ट(cid:14)र मा‘ूल के साथ, िव(cid:29)व नाथ च(cid:27)रय@ल ी (रेि\टीफायर इंड) तथा आगरा (इनवट(cid:14)र इंड), को उ(cid:2)त र पूव] ,े9 म(cid:25) जल िव(cid:17)तु प(cid:27)रयोजना(cid:31) (एचईपी) से िव(cid:17)ुत िन_क ष(cid:14)ण हते ु उ(cid:2)त र पूव] ,े9- उ(cid:2)त री ,े9/पिdमी ,े9 से अंतर-संयोजन प(cid:27)रयोजना के एक अंग के )प म(cid:25) िवकिसत 'कया जा रहा ह।ै इसे अलीपुरPार म(cid:25) एलआईएलओ से जोड़ा जाएगा। आगरा म(cid:25) 3000 मेगावाट अित(cid:27)र\त क(व ट(cid:14)र मा‘ूल से ट*मनल क ,मता बढ़कर 6000 मेगावाट हो जाएगी, िजसके मा(cid:24)य म से भूटान से िव(cid:17)तु आयात करने हते ु योजना बनाई गई ह।ै तदनुसार, भारत म(cid:25) पारेषण (cid:19)णाली लागू 'कए जाने का (cid:19)ारंिभक चरण िन€न वत होगा : (i) अलीपुरPार म(cid:25) ± 800 के.वी. 3000 मेगावाट क(व ट(cid:14)र मा‘ूल के साथ नया 2x315 एम.वी.ए., 400/220 के.वी. ए.सी. एवं एचवीडीसी सब-(cid:9)ट ेशन। (ii) आगरा म(cid:25) 3000 मेगावाट इ(व ट(cid:14)र मा‘ूल सिहत 800 के.वी. एचवीडीसी (cid:9)ट ेशन का िव(cid:9)त ार। (iii) अलीपुरPार म(cid:25) एचवीडीसी क(व ट(cid:14)र (cid:9)ट ेशन के समानांतर (cid:19)चालन के िलए अलीपुरPार लाइन पर 800 के.वी. िव(cid:29)व नाथ च(cid:27)रय@ल ी - आगरा एचवीडीसी बाई-पोल का एलआईएलओ। (iv) अलीपुरPार म(cid:25) ब%गईगांव-िसिलगुड़ी 400 के.वी. डी/सी \व ाड लाइन का एलआईएलओ। (v) अलीपुरPार म(cid:25) टाला िसिलगड़ु ी 400 के.वी. 1x डी/सी लाइन का एलआईएलओ। (vi) अलीपुरPार म(cid:25) बीरापाड़ा -सलाकती 220 के.वी. डी/सी लाइन का एलआईएलओ। (vii) संकोष/हमोई Dजगखा-अलीपुरPार 400 के.वी. 1xडी/सी \व ाड मूज लाइन (भारतीय िह(cid:9)स ा) 8888....9999....3333 भभभभटटूूटटूू ाााानननन सससस ेे ेे 2222000022220000 ततततकककक अअअअिििितततत????रररर\\\\तत तत ििििववववRRRRततुुततुु आआआआययययाााातततत हहहहततेेततेे ुु ुुपपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी :::: भूटान के पूव] भाग म(cid:25) 2017 से 2020 तक मांगदचे ू, िनकाचू, चामकरच-ू ।, कुरी ग%गरी तथा खोल%गच ू जल िव(cid:17)ुत प(cid:27)रयोजनाए ं (एचईपी) तैयार 'कए जाने क योजना बनाई गई ह।ै भूटान क आतं (cid:27)रक मांग को पूरा करते #ए इन जल िव(cid:17)ुत प(cid:27)रयोजनाएओ (एचईपी) से िजगमेDलग (वाया गोDलग) म(cid:25) िव(cid:17)ुत पूल 'कया जाना (cid:19)(cid:9)त ािवत ह ै तथा वहाँ से 400 के.वी. डी/सी \व ाड मूज कंड\ट र लाइन Pारा अलीपुरPार (प.बं) म(cid:25) इसे पूल 'कया जाएगा। सामा(य उqच (cid:19)चालन ि(cid:9)थित म(cid:25) िजगमेDलग के पास भारत को िनयात(cid:14) हते ु 1500 से 1900 मेगावाट अित(cid:27)र\त िव(cid:17)ुत होगी। इसके अित(cid:27)र\त संकोष/हमोई Dजगखा से अलीपुरPार को 4200-4400 मेगावाट िव(cid:17)ुत, 400 के.वी. 2xडी/सी \व ाड मूज लाइन% स े पारेिषत क¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 793 जाएगी। अलीपुरPार स े भारत के उ(cid:2)त री/पिdमी (िव(cid:17)ुत कमी वाले) ,े9% को इतनी बड़ी (cid:19)मा9ा म (cid:25) िव(cid:17)ुत अंतरण के िलए एक नई तथा (cid:9)व तं9 800 के.वी., 6000 मेगावाट एचवीडीसी बाई-पोल लाइन भारत के उ(cid:2)त री अथवा पिdमी ,े9 (,े9ीय लोड प(cid:27)रद(cid:29)ृ य को दखे ते #ए) म(cid:25) उिचत िड-पूDलग Oव ाइंट पर िवकिसत 'कए जाने क योजना ह ै ता'क अलीपुरPार के 3000 मेगावाट क(व ट(cid:14)र ट*मनल ,मता को बढ़ाकर 6000 मेगावाट तथा िड-पूDलग Oव ाइंट पर 6000 मेगावाट का नया क(व ट(cid:14)र (cid:9)ट ेशन (इ(व ट(cid:14)र ट*मनल) तैयार 'कया जा सके। तदोपरांत, अलीपुरPार म(cid:25) 800 के.वी., 6000 मेगावाट िव(cid:29)व नाथ च(cid:27)रय@ल ी (एनईआर)-आगरा (एनआर) एचवीडीसी लाइन के एलआईएलओ को हटाते #ए िव(cid:29)व नाथ च(cid:27)रय@ल ी (एनईआर) स े आगरा (एनआर) एचवीडीसी बाई-पोल लाइन को सीधे चालू कर 'दया जाएगा। पूव] भूटान क जल िव(cid:17)तु प(cid:27)रयोजना(cid:31) से यांगबारी पूDलग (cid:9)ट ेशन पर (cid:19)वािहत िव़ (cid:17)ुत, 400 के.वी. यांगबारी-रांिगया/रौटा-उ.,.े /प.,े. एचवीडीसी बाई-पोल लाइन से असम म(cid:25) रांिगया/रौटा (cid:9)ट ेशन पर 400 के.वी. ईएचवीएसी एवं एचवीडीसी (cid:9)ट ेशन पर पूल क जाएगी। भूटान तथा अ)णाचल (cid:19)दशे के उ(cid:2)त र पूव] ,े9% म(cid:25) vवांग एवं काम(cid:25)ग बेिसन क जल िव(cid:17)ुत प(cid:27)रयोजना(cid:31) स े िव(cid:17)ुत िन_क ष(cid:14)ण के िलए क(व ट(cid:14)र ,मता 6000 मेगावाट (कुरी ग%गरी हते ु 1800 मेगावाट) अथवा 7000 मेगावाट (कुरी-ग%गरी हते ु 3400 मेगावाट) 'कए जाने पर िवचार 'कया गया ह।ै इस (cid:19)कार पारेषण ि>ड के सुदढ़ृ ीकरण म(cid:25) िन€न िलिखत शािमल ह%गे : (i) 400 के.वी. िजगमेDलग-अलीपुरPार \व ाड मूज डी/सी लाइन (भारतीय िह(cid:9)स े) का िनमा(cid:14)ण। (ii) 400 के.वी. यांगबारी/रांिगया/रौटा 2xडी/सी \व ाड मूज कंड\ट र लाइन% (भारतीय िह(cid:9)स े) का िनमा(cid:14)ण। (iii) अलीपुरPार से उ.,े/प.,े. म(cid:25) उपयु\त िड-पूDलग Oव ाइंट तक + 800 के.वी. 6000 मेगावाट एचवीडीसी बाई-पोल नई लाइन क (cid:9)थ ापना तथा अलीपुरPार के एलआईएल को हटाते #ए 800 के.वी. िव(cid:29)व नाथ च(cid:27)रय@ल ी (एनईआर) – आगरा (एनआर) एचवीडीसी लाइन का पुन*नमा(cid:14)ण । (iv) + 800 के.वी., रांिगया/रौटा-उ.,े./प.,े. एचवीडीसी बाईपोल लाइन के साथ 6000 मेगावाट क(व ट(cid:14)र ,मता (कुरी-ग%गरी हते ु 1800 मेगावाट) अथवा रांिगया/रौटा एवं उ.,.े /प.,.े म(cid:25) (cid:19)(cid:2)य ेक के िलए 7000 मेगावाट (कुरी-ग%गरी हते ु 3400 मेगावाट) वष(cid:14) 2020 तक पारेषण (cid:19)णाली को िच9 स.ं 8.08 म(cid:25) दशा(cid:14)या गया ह।ै 8888....9999....4444 भभभभटटूूटटूू ाााानननन सससस ेे ेेववववषषषष (cid:8)(cid:8) (cid:8)(cid:8)2222000033330000 ततततकककक ििििवव़़वव़़ RRRRततुुततुु आआआआययययाााातततत हहहहततेेततेे ुु ुुससससभभंंभभंं ााााििििववववतततत पपपपााााररररेेेेषषषषणणणण ययययोोोोजजजजननननााााएएएए ंं ंं:::: भिव_य म(cid:25) सीमापार िन€न िलिखत बड़ े एचवीडीसी एवं एस.सी. कॉ(cid:27)रडोर क आव(cid:29)य कता ह ै : I. भभभभााााररररततततीीीीयययय ििििKKKKडडडड हहहहततेेततेे ुु ुुववववषषषष (cid:8)(cid:8) (cid:8)(cid:8)2222000033330000 ततततकककक ससससभभंंभभंं ााााििििववववतततत एएएएचचचचववववीीीीडडडडीीीीससससीीीी पपपपााााररररेेेेषषषषणणणण ककककॉॉॉॉ????ररररडडडडोोोोरररर :::: i. ± 800 के.वी., 6500 मेगावाट रांिगया/रौटा–प.,े./उ.,े. एचवीडीसी िPतीय बाईपोल ii. ± 800 के.वी., 6000 मेगावाट संकोष/हमोई Dजगखा-उ.,े./प.,े. एचवीडीसी बाईपोल iii. ± 800 के.वी. 6500 मेगावाट यांगबारी-प.,े./उ.,े. एचवीडीसी बाईपोल IIIIIIII.... ववववषषषष (cid:8)(cid:8) (cid:8)(cid:8)2222000033330000 ततततकककक ससससीीीीममममाााापपपपाााारररर ससससभभभभंंंं ााााििििववववतततत एएएएसससस....ससससीीीी.... पपपपााााररररेेेेषषषषणणणण ककककॉॉॉॉ????ररररडडडडोोोोरररर :::: iv. 400 के.वी. अमोच-ू ।/।।-अलीपुरPार डी/सी लाइन v. मानस-आरएस।/।।-रांिगया/रौटा 2xडी/सी \व ाड मूज कंड\ट र लाइन(cid:25) vi. (य रे ा अमारी।।-रांिगया/रौटा 2xडी/सी \व ाड मूज कंड\ट र लाइन(cid:25) वष(cid:14) 2030 तक पारेषण (cid:19)णाली िच9 सं. 8.09 म(cid:25) (cid:19)द*शत ह ै794 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ििििचचचच(cid:17)(cid:17)(cid:17)(cid:17) सससस..ंं..ंं –––– 8888....8888 ((((2222000022220000 का प(cid:27)रद(cid:29)ृ य ))))¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 795 ििििचचचच(cid:17)(cid:17)(cid:17)(cid:17) सससस..ंं..ंं –––– 8888....9999 ((((2222000022220000 का प(cid:27)रद(cid:29)ृ य ))))796 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 8888....11110000 नेपाल म(cid:25) िव(cid:17)ुत प(cid:27)रयोजना(cid:31) से िव(cid:17)तु -िन_क ष(cid:14)ण हते ु संभािवत पारेषण योजना 8888....11110000....1111 ममममौौौौजजजजददूूददूू ाााा ससससीीीीममममाााापपपपाााारररर अअअअततंंततंं रररर----ससससययंंययंं ोोोोजजजजनननन ((((इइइइंंंंटटटटरररर ककककनननन\\ेे\\ेे शश शश नननन)))) नेपाल िव(cid:17)ुत (cid:19)ािधकरण तथा भारतीय िव(cid:17)तु कंपिनय% जैसे बीएसईबी, यूपीपीसीएल तथा यूपीसीएल के बीच ि़व(cid:17)ुत का आदान-(cid:19)दान, दोन% ओर सीमापार दरू -दराज के इलाक% म(cid:25) िव(cid:17)ुत आव(cid:29)य कता(cid:31) को पूरा करने के िस-ातं के आधार होता रहा ह।ै िPप,ीय िव(cid:17)ुत आदान-(cid:19)दान के िलए 11 के.वी., 33 के.वी. तथा 132 के.वी. पारेषण लाइन% सिहत सीमापार करीब 13 अतं र-संयोजन सिु वधाए ं (cid:19)चालन म (cid:25) ह।" भारतीय िव(cid:17)तु कंपिनया ँ िव(cid:17)ुत लेन-दने सिमित Pारा िनधा(cid:14)(cid:27)रत टै(cid:27)रफ िस-ांत के आधार नेपाल को िव(cid:17)ुत आपू*त करती ह।" महाकाली संिध के अतं ग(cid:14)त भारत भी 132 के.वी. टनकपुर-मह(े F नगर एस/सी लाइन Pारा टनकपुर एचईपी (120 मेगावाट) से नेपाल को लगभग 70 एम.यू. मुJत िव(cid:17)ुत आपू*त करता ह।ै इसके अित(cid:27)र\त लघु अविध के अंतग(cid:14)त नेपाल को काम*सयल )ट पर 75 मेगावाट अित(cid:27)र(cid:129) तथा इसके आग े म(cid:24)य म अविध के अंतग(cid:14)त 132 मेगावाट िव(cid:17)ुत आपू*त करने हते ु (cid:19)णाली संवध(cid:14)न के उपाय% पर िविभ(न चरण% म(cid:25) '(cid:15)या(व यन हो चल रहा ह।ै 8888....11110000....2222 ममममजजुुजजुु ppppफफफफररररपपपपररुुररुु ((((भभभभााााररररतततत))))----ढढढढााााललललककककेेेेबबबबाााारररर ((((ननननपपेेपपेे ाााालललल)))) ससससीीीीममममाााापपपपाााारररर 444400000000 ककककेेेे....ववववीीीी.... कककक.... ////थथ थथ ाााापपपपननननाााा 400 के.वी. मुजJफरपुर (भारत)-ढालकेबार डी/सी लाइन (भारतीय िह(cid:9)स ा िजसक लबं ाई 87 'कमी.- सीपीटीसी (संयु\त उप(cid:15)म) Pारा तथा 39 'कमी क लबं ाई जो नेपाल के िह(cid:9)स े म(cid:25) आता ह,ै का िनमा(cid:14)ण संयु\त उप(cid:15)म कंपिनय% जसै े-भारतीय िह(cid:9)स े के िलए सीमापार पारेषण कंपनी ((cid:15)ास बाडर(cid:14) [ांसिमशन कंपनी/सीपीटीयू) एवं नेपाल के िह(cid:9)स े म(cid:25) आने वाला काय(cid:14) पावर [ांसिमशन कंपनी िलिमटेड (पीटीसीएन) Pारा 'कया जा रहा ह।ै नेपाल िव(cid:17)ुत अिधकरण तथा िव(cid:17)ुत पारेषण कंपनी (पावर [ांसिमशन कंपनी) के बीच िव(cid:17)ुत िव(cid:15)य अनुबंध पर ह(cid:9)त ा,र हो चकु ा ह।ै नपे ाल िव(cid:17)ुत अिधकरण और सीमापार पारेषण कंपनी ((cid:15)ास बाडर(cid:14) [ांसिमशन कंपनी/सीपीटीयू) एवं नेपाल िव(cid:17)ुत अिधकरण और िव(cid:17)ुत पारेषण कंपनी िलिमटेड (पीटीसीएन) के बीच '(cid:15)या(व यन एवं पारेषण सेवा अनुबंध (आईटीएसए) पर भी ह(cid:9)त ा,र हो गए ह।" इस पारेषण लाइन को जून, 2014 तक पूरा कर िलया जाना िनधा(cid:14)(cid:27)रत ह।ै आरंिभक 5 से 7 वषi के िलए नेपाल म(cid:25) 200 से 300 मेगावाट िव(cid:17)ुत क कमी होन े का अनुमान लगाया गया ह,ै िजस े भारतीय िव(cid:17)ुत बाजार स े आयात करके पूरा 'कया जाना ह।ै यह आपू*त 400 के.वी. मुजJफरपुर-ढालकेबार डी/सी लाइन, िजस े आरंभ म(cid:25) 220 के.वी. पर (cid:19)चािलत 'कया जाना ह,ै से क जाएगी। 8888....11110000....3333 ननननपपेेपपेे ाााालललल सससस ेे ेेििििववववRRRRततुुततुु आआआआययययाााातततत हहहहततेेततेे ुुुुससससभभंंभभंं ााााििििववववतततत ििििववववRRRRततुुततुु पपपपााााररररेेेेषषषषणणणण ययययोोोोजजजजननननाााा:::: आगामी 7 से 10 वषi म(cid:25) नेपाल म(cid:25) िव(cid:17)ुत प(cid:27)रयोजनाए ं यथा- अपर मास(cid:14)यांगडी (600 मेगावाट), अपर करनाली (900 मेगावाट), अ)ण-।।। (900 मेगावाट), तमाकोशी (800 मेगावाट) इ(cid:2)य ा'द प(cid:27)रयोजना(cid:31) के पूरी होने क संभावनाए ं ह।" अपनी आंत(cid:27)रक मांग को पूरा करने के बाद नेपाल िव(cid:17)ुत अिधकरण के पास बड़ी मा9ा म(cid:25) अित(cid:27)र\ त िव(cid:17)ुत होगी। नेपाल से िव(cid:17)ुत िन_क ष(cid:14)ण तथा भारत म(cid:25) इसके अंतरण के िलए वहाँ क उपरो\त जल िव(cid:17)ुत प(cid:27)रयोजना(cid:31) के चालू होने के समय तक अपर करनेली से बरेली, अपर मास(cid:14)यांगडी से गोरखपुर, अ)ण-।।। से मुजJफरपुर तथा बुटावल स े गोरखपुर म(cid:25) उqच ,मता घन(cid:2)व के 400 के.वी. ए/सी. Dलक% को सीमापार कॉ(cid:27)रडोर के )प म(cid:25) िवकिसत 'कए जाने क योजना बनाई जा रही ह।ै¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 797 ििििनननन@@@@नन नन ििििललललििििखखखखतततत ििििचचचच(cid:17)(cid:17)(cid:17)(cid:17) मममम (cid:19)(cid:19) (cid:19)(cid:19)भभभभााााररररतततत एएएएवववव ंं ंंननननपपेेपपेे ाााालललल ककककेेेे बबबबीीीीचचचच ममममौौौौजजजजददूूददूू ाााा एएएएवववव ंं ंंससससभभंंभभंं ााााििििववववतततत ससससीीीीममममाााापपपपाााारररर ििििववववRRRRततुुततुु अअअअततंंततंं रररर----ससससययंंययंं ोोोोजजजजनननन U.KARNALI (900MW) BAREILLY MARSYANDGI (600MW) TAMAKOSHI 880MW ARUN-III (900MW) DHALKEBAR (JANAKPUR) GORAKHPUR (PG) MUZAFFARP PU GR T M 8888....11111111 @@@@यय यय ााााममंंममंं ाााारररर मममम (cid:19)(cid:19) (cid:19)(cid:19) ततततममममननननथथथथीीीी एएएएवववव ंं ंं AAAAवववव जजेेजजेे ईईेेईईेे जजजजलललल ििििववववRRRRततुुततुु पपपप????ररररययययोोोोजजजजननननाााा ((((एएएएचचचचईईईईपपपपीीीी)))) सससस ेे ेे ििििववववRRRRततुुततुु ििििननननPPPPकक कक षषषषणण(cid:8)(cid:8)णण(cid:8)(cid:8) हहहहततेेततेे ुु ुु ससससभभंंभभंं ााााििििववववतततत पपपपााााररररेेेेषषषषणणणण ययययोोोोजजजजननननाााा :::: 8888....11111111....1111 (cid:11)(cid:11)(cid:11)(cid:11)////तत तत ााााववववननननाााा :::: €य ांमार म(cid:25) Dछदिवन नदी बेिसन म(cid:25) तमनथी जल िव(cid:17)ुत प(cid:27)रयोजना (एचईपी) 1200 मेगावाट तथा (cid:29)व ेजेई जल िव(cid:17)तु प(cid:27)रयोजना (एचईपी) 880 मेगावाट क दो जल िव(cid:17)ुत प(cid:27)रयोजनाए ं बनाई जा रही ह।" भारत तथा €य ांमार के बीच िPप,ीय सहयोग बढ़ाने के िलए जल िव(cid:17)ुत '(cid:15)या(व यन िवभाग (डीएचपीआई), ि़व(cid:17)ुत ऊजा(cid:14) मं9ालय, €य ांमार सरकार एवं एनएचपीसी िलिमटेड के बीच इन प(cid:27)रयोजना(cid:31) के िवकास हते ु एक सहमित (cid:141)ापन (एम.ओ.यू.) पर ह(cid:9)त ा,र 'कए गए ह।" वष(cid:14) 2018-20 तक इ(ह (cid:25) पूण(cid:14) 'कए जाने क संभावना ह ै और इसीिलए इन प(cid:27)रयोजना(cid:31) से िव(cid:17)ुत िन_क ष(cid:14)ण हते ु संभािवत योजना बनाई गई ह।ै 8888....11111111....2222 @@@@यय यय ााााममंंममंं ाााारररर मममम(cid:19) (cid:19) (cid:19) (cid:19) ततततममममननननथथथथीीीी एएएएवववव ंं ंं AAAAवव वव जजेेजजेे ईईेेईईेे जजजजलललल ििििववववRRRRततुुततुु पपपप????ररररययययोोोोजजजजननननाााा ((((एएएएचचचचईईईईपपपपीीीी)))) सससस ेे ेे ििििववववRRRRततुुततुु ििििननननPPPPकक कक षषषषणण(cid:8)(cid:8)णण(cid:8)(cid:8) हहहहततेेततेे ुु ुु पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी :::: €य ांमार, भारत के पूवy(cid:2)त र रा3य % से भौगोिलक )प से िनकट होने के कारण, वहाँ क िव(cid:17)तु प(cid:27)रयोजना(cid:31) क िव(cid:17)तु को पहले पूवy(cid:2)त र ,े9 म(cid:25) लाना तथा इसके बाद उसे भारत के अ(य िह(cid:9)स % म(cid:25) पारेिषत करना 'कफायती होगा। प(cid:27)रद(cid:29)ृ य को दखे ते #ए तमनथी एवं (cid:29)व ेजेई जल िव(cid:17)ुत प(cid:27)रयोजना(cid:31) स े798 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] िव(cid:17)ुत िन_क ष(cid:14)ण हते ु पारेषण (cid:19)णाली क योजना बनाई गई ह।ै इसके पहले प(cid:27)रद(cid:29)ृ य म(cid:25) पूवy(cid:2)त र म(cid:25) नई िव(cid:17)ुत प(cid:27)रयोजना(cid:31) को €य ांमार क िव(cid:17)तु प(cid:27)रयोजना स े जोड़ा जाना होगा तथा इसके िलए 7000 मेगावाट एचवीडीसी क उqच ,मता पारेषण कॉ(cid:27)रडोर क योजना बनाई गई ह।ै दसू रे प(cid:27)रद(cid:29)ृ य म (cid:25) पूवy(cid:2)त र ,े9 म(cid:25) भिव_य म(cid:25) 'कसी दसू री बड़ी िव(cid:17)तु प(cid:27)रयोजना क योजना नह8 ह,ै िजसे €य ांमार क िव(cid:17)ुत प(cid:27)रयोजना स े जोड़ा जा सके। इसिलए केवल ए.सी. पारेषण (cid:19)णाली का उपयोग करते #ए िव(cid:17)तु अंतरण क योजना बनाई गई ह।ै उ(cid:2)प ादन प(cid:27)रयोजना(cid:31) के िविवध िववरण जैसे चाल ू होने क समयाविध, भारतीय ि>ड को आपू*त क जाने वाली िव(cid:17)ुत क (cid:19)मा9ा तथा इसके लाभा*थय% आ'द को अंितम )प 'दए जाने के बाद पारेषण (cid:19)णाली को सुदढ़ृ 'कया जाना होगा। तदनु)प, €य ांमार उ(cid:2)प ादन प(cid:27)रयोजना(cid:31) स े िव(cid:17)ुत िन_क ष(cid:14)ण तथा िव(cid:17)ुत अतं रण हते ु िन€न िलिखत िवक@प % पर िवचार 'कया गया ह ै : 8888....11111111....3333 मममम>>ुु>>ुु यय यय ििििववववकककक पप प प :::: उउउउ9999तत तत रररर पपपपववूूववूू 0000 (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे सससस ेे ेे उउउउ9999तत तत ररररीीीी////पपपपििििDDDDममममीीीी (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे ककककोोोो एएएएकककक ननननईईईई ++++888800000000 ककककेेेे....ववववीीीी....,,,, 7777000000000000 ममममगगेेगगेे ााााववववााााटटटट बबबबााााईईईईपपपपोोोोलललल ललललााााइइइइनननन कककक.... उउउउ9999तत तत रररर पपपपववूूववूू 0000 (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे मममम (cid:19)(cid:19) (cid:19)(cid:19)ननननएएएए पपपप--ूू--ूू ललललगगगग bbbbवव वव ााााइइइइंंंंटटटट ((((ििििशशशशललललाााापपपपठठठठाााारररर)))) ततततकककक पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी 1. (cid:29)व ेजेई–तमनथी 400 के.वी. डी/सी लाइन 2. तमनथी-नामसा’ पूDलग Oव ाइंट (एनईआर) 400 के.वी. 2x डी/सी लाइन (िvवन लैपDवग) 3. तमनही छोर पर (cid:29)व ेजेई-तमनही लाइन पर टीसीएससी (थाय(cid:27)र(cid:9)ट र कं[ो@ड सीरीज कंप(स ैटर) (िनयत : 40% प(cid:27)रवत(cid:14)नीय : 5-15%) ख. नामसा’ पूDलग (एनईआर) से उ(cid:2)त री ,े9/पिdमी ,9े को +/- 800 के.वी., 7000 मेगावाट एचवीडीसी बाईपोलर क साझा पारेषण (cid:19)णाली 1. नामसा’ पूDलग (एनईआर) से उ(cid:2)त री ,े9/पिdमी ,े9 को +/- 800 के.वी., 7000 मेगावाट एचवीडीसी बाईपोलर लाइन 2. नामसा’ पूDलग (एनईआर) और उ(cid:2)त री ,े9/पिdमी ,े9 पूDलग Oव ाइंट पर +/- 800 के.वी., 6000 मेगावाट एचवीडीसी ट*मनल 8888....11111111....4444 ििििववववकककक पप पप ----2222:::: उउउउ9999तत तत रररर पपपपववूूववूू 0000 (cid:15)(cid:15)(cid:15)(cid:15)(cid:17)(cid:17)ेे(cid:17)(cid:17)ेे मममम (cid:19)(cid:19) (cid:19)(cid:19)एएएए....ससससीीीी.... पपपपााााररररेेेेषषषषणणणण (cid:11)(cid:11)(cid:11)(cid:11)णणणणााााललललीीीी ककककाााा उउउउपपपपययययोोोोगगगग क. उ(cid:2)त र पूव] ,े9 (एनईआर) म(cid:25) िव(cid:29)व नाथ च(cid:27)रय@ल ी पूDलग Oव ाइंट तक पारेषण (cid:19)णाली 1. (cid:29)व ेजेई–तमनथी 400 के.वी. डी/सी लाइन 2. तमनथी-िव(cid:29)व नाथ च(cid:27)रय@ल ी (एनईआर) 400 के.वी. 2x डी/सी लाइन (िvवन लैपDवग) 3. तमनही छोर पर (cid:29)व ेजेई-तमनही लाइन पर टीसीएससी (थाय(cid:27)र(cid:9)ट र कं[ो@ड सीरीज कंप(स ैटर) (िनयत : 40% प(cid:27)रवत(cid:14)नीय : 5-15%) ख. साझा पारेषण (cid:19)णाली 1. ब%गईगांव-िसिलगुड़ी 400 के.वी. डी/सी लाइन का िvवन से उqच ,मतायु\त कंड\ट र म(cid:25) (cid:27)रकंड\ट zरग 2. पटना – वाराणसी 400 के.वी. डी/सी लाइन (\व ाड कंड\ टर) ****************************************¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 799 अअअअ(cid:2)(cid:2)(cid:2)(cid:2)यय यय ाााायययय ---- 9999 – एएएएननननईईईईपपपपीीीी पपपपााााररररेेेेषषषषणणणण पपपपरररर ????टटटटbbbbपप पप ििििणणणणययययाााा ंं ंं िव(cid:17)ुत अिधिनयम, 2003 के अनुसार सीईए को हर पांच वष(cid:14) म(cid:25) रा_[ ीय िव(cid:17)तु योजना (एनईपी) तैयार करना ह।ै अिधिनयम म(cid:25) यह भी (cid:19)ावधान 'कया गया ह ै 'क सीईए एनईपी तैयार करते समय इसके मसौदा (cid:19)कािशत करेगा और लाइसस(cid:25) धारक%, उ(cid:2)प ादन कंपिनय% और जनता के सुझाव और आपि<यां आमंि9त ~~ करेगा। इसके प(cid:29)च ात के(F सरकार का अनुमोदन (cid:19)ाOत 'कया जाता ह ै और 'फर योजना अिधसूिचत क जाती ह।ै मसौदा एनईपी िजसम(cid:25) 11व8 और 12व8 योजना क Šय ापक समी,ा शािमल ह,ै और सीईए Pारा संभािवत योजना दो अंक% (भाग-। - उ(cid:2)प ादन पर और भाग-।। पारेषण पर) म(cid:25) तैयार क गई तथा 29.3.2012 को उसे सीईए क वेबसाइट पर अपलोड 'कया गया। मसौदा एनईपी पर िवचार/सुझाव/(cid:27)टOप िणयां 30 जून, 2012 तक आमंि9त क ग’। िन€न िलिखत कंपिनय%/Šय ि(cid:129)य% न े रा_[ ीय िव(cid:17)ुत योजना (अंक-।।), पारेषण पर अपने िवचार/सुझाव/(cid:27)टOप िणयां भेजी ह " : (cid:7)(cid:7)(cid:7)(cid:7).... सससस..ंं..ंं पपपपणणणणधधधधााााररररकककक ककककाााा ननननाााामममम 1. मैसस(cid:8) पावर िस(cid:21)ट म ऑपरेशन कॉप^रेशन िल. 2. मैसस(cid:8) एनएचपीसी िल. 3. मैसस(cid:8) भाखड़ा Eय ास मैनेजम#ट बोड(cid:8) 4. मैसस(cid:8) यूपी पावर पावर [ांसिमशन कॉप^रेशन िल; 5. मैसस(cid:8) उड़ीसा पावर [ांसिमशन िल. 6. मैसस(cid:8) छ8 तीसगढ़ (cid:21)ट ेट पावर [ांसिमशन कॉपोरेशन िलिमटेड 7. मैसस (cid:8) पीटीसी इंिडया िल. 8. मैसस (cid:8) एसोिसएशन ऑफ पावर पच_जस(cid:8) 9. मैसस (cid:8) पावर (cid:10)रसच(cid:8) ए‘ड डवलपम#ट कंसFट #ट Dा. िल. 10. मैसस (cid:8) इंिडया Rवड एनजW एसोिसएशन 11. मैसस (cid:8) इंिडया Rवड पावर एसोिसएशन 12. मैसस (cid:8) (cid:10)रलायंस पावर [ांसिमशन िल. 13. मैसस (cid:8) लाचंग हाइaो पावर िल. 14. मैसस (cid:8) ती(cid:21) ता हाइaो पावर Dा. िल. 15. मैसस (cid:8) अथेना, छ8त ीसगढ़ पावर िल. 16. मैसस (cid:8) चुंगथगं हाइaो पावर िल. 17. मैसस (cid:8) एमबी पावर (छ8त ीसगढ़) िल. 18. bी ए. राजा राव, सेवािनवृ8त काय(cid:8)पालक िनदेशक, बीएचईएल, बंगलौर 19. bी ज.े बालासुcाम‘य म, पावर से1ट र Dोफेशनल 20. bी जयंत इंगोिलकर, नागपुर वत(cid:14)मान रा_[ ीय िव(cid:17)ुत योजना (अंक-।।) –––– पारेषण को उपयु(cid:14)\त (cid:19)ाOत िवचार/सुझाव%/(cid:27)टOप िणय% को (cid:24)य ान म(cid:25) रखत े #ए उपयु\त ढंग से अंितम )प 'दया गया ह।ै ****************************************800 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] National Electricity Plan (Volume II) Transmission [In fulfilment of CEA's obligation under section 3(4) of the Electricity Act 2003] Government of India Ministry of Power Central Electricity Authority November, 2012¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 801 ACRONYMS ACRONYMS EXPANSION ABT Availability Based Tariff AC Alternating Current AEGCL Assam Electric Generation Company Limited AERC Assam Electricity Regulatory Commission AI All India APDRP Accelerated Power Development and Reform Program APP Atomic Power Plant APTRANSCO Andhra Pradesh Transmission Corporation Aug Augmentation b-t-b back-to-back BSEB Bihar State Electricity Board CEA Central Electricity Authority CERC Central Electricity Regulatory Commission Ckm circuit kilometer CPP Central Power Project CPSU Central Public Sector Undertaking CSEB Chhatisgarh State Electricity Board CTU Central Transmission Utility D/C Double Circuit DVC Damodar Valley Corporation EA 2003 Electricity Act 2003 EHV Extra High Voltage EPS Electric Power Survey ER Eastern Region ERC Electricity Regulatory Commission FACTS Flexible AC Transmission System GETCO Gujarat Energy Transmission Corporation GIS Gas Insulated Switchgear802 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] GOI Government of India GVA Giga Volt Ampere GW Giga Watt GWe Giga Watt Electrical HEP Hydro Electric Project HVDC High Voltage Direct Current ICTs Interconnecting Transformers ISGS Inter State Generating Station(s) ISTS Inter State Transmission System Intra-STS Intra-State Transmission System JV Joint Venture KPTCL Karnataka Power Transmission Corporation Limited KUMPP Krishnapattnam UMPP kV kilo Volt LILO Line In Line Out LNG Liquefied Natural Gas LT Low Tension LTOA Long Term Open Access MAPP Madras APP MoP Ministry of Power MVA Mega Volt Ampere MVAR Mega Volt Ampere Reactive MW Mega Watt NEA Nepal Electricity Authority NEEPCO North Eastern Electric Power Corporation NEP National Electricity Plan NER North Eastern Region NHPC National Hydro Power Corporation NLC Neyveli Lignite Corporation NLCPR Non Lapsable Central Pool Resources NPC Nuclear Power Corporation¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 803 NPCIL Nuclear Power Corporation of India Limited NR Northern Region NRLDC Northern Regional Load Dispatch Center NRPC Northern Regional Power Committee NTPC National Thermal Power Corporation ONGC Oil and Natural Gas Corporation op. operated PFBR Pulverized Fuel Breeding Reactor PFC Power Finance Corporation PG Power Grid POWERGRID/PGCIL Powergrid Corporation of India Limited PLCC Power Line Carrier Communication PLF Plant Load Factor PMGY Prime Minister Grameen Yojana PPA Power Purchase Agreement PSS Power System Stabilizer PMU Phasor Measurement Unit PSU Public Sector Undertaking PTCUL Power Transmission Corporation of Uttranchal Ltd Quad Quadrupled Bundle Conductor R&M Renovation & Modernisation RAPP Rajasthan APP RE Rural Electrification RPC Regional Power Committee RL Root Length RLDC Regional Load Dispatch Center RoW Right of Way RPCs Regional Power Committees S/C Single Circuit S/C on D/C Single Circuit on Double Circuit towers S/S, s/s Sub-Station, sub-station804 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] SC Series Compensation SEB State Electricity Board SERC State Electricity Regulatory Commission SLDC State Load Dispatch Center SR Southern Region SRLDC Southern Regional Load Dispatch Center SRPC Southern Region Power Committee STATCOM Static Compensation Stg 2nd ckt Stringing of second circuit STOA Short Term Open Access STU State Transmission Utility SVC Static VAR Compensation TAPP Tarapur APP Tckm Thousand circuit kilometer TCSC Thyristor Controlled Series Compensation TM Twin Moose TPS Thermal Power Station TSECL Tripura State Electric Corporation Limited UCPTT Unified Common Pool Transmission Tariff UHVDC Ultra HVDC UI Unscheduled Interchange ULDC Unified Load Dispatch Center UMPP Ultra Mega Power Project UPCL Uttrakhant Power Corp. Ltd UPPCL Utter Pradesh Power Corp. Ltd VAR Volt Ampere Reactive VLGO Very Large Grid Operators WR Western Region WRLDC Western Regional Load Dispatch Center WRPC Western Region Power Committee¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 805 CHAPTER - 1 INTRODUCTION 1.1 NATIONAL ELECTRICITY PLAN As per Section 3 of the Electricity Act 2003, Central Electricity Authority (CEA) has been entrusted with the responsibility of preparing the National Electricity Plan in accordance with the National Electricity Policy and notify such plan once in five years. The Act provides that the draft of National Electricity Plan has to be published inviting suggestions and objections from licensees, generating companies and the public and CEA has to obtain approval of the Central Government before notifying the National Electricity Plan. CEA prepared the Draft NEP and has made it available to all the stakeholders through its website on 29th March 2012, last date for receiving comments was 30th June 2012. This release titled ‘National Electricity Plan (Volume-II) – Transmission’, which covers the transmission plan for 12th Plan period (i.e. 2012-13 to 2016-17) and perspective plan for beyond 12th Plan, in its updated form takes into account the comments/suggestions of various stakeholders on the draft document. 1.2 NATIONAL ELECTRICITY PLAN – TRANSMISSION Transmission planning is a continuous process of identification of transmission system addition requirements, their timing and need. The transmission requirements could arise from new generation additions in the system, increase in demand and general system strengthening not necessarily associated with a particular generation project. These transmission addition requirements are identified, studied and firmed through the transmission planning process. 1.3 TRANSMISSION SYSTEMS IN INDIA The transmission systems that are in place in the country consist of Inter-State Transmission System(ISTS) and Intra State Transmission System(Intra-STS). 1.3.1 Inter-State Transmission System (ISTS) ISTS is mainly owned and operated by Power Grid Corporation of India Limited(POWERGRID) which is also Central Transmission Utility(CTU). In future, Inter-State Transmission System (ISTS) schemes would be built through competitive bidding and many private sector entities would own and operate the ISTS elements. Already, a number of ISTS schemes owned by the private sector or joint venture(JV) between private sector and POWERGRID are under construction. The ISTS serves the following purpose: (i) Evacuation of power from inter-state generation stations which have beneficiaries in more than one state. (ii) Onwards transmission of power for delivery of power from inter-state generation stations up to the delivery point of the state grid. (iii) Transfer of operational surpluses from surplus state(s) to deficit state(s) or from surplus region(s) to deficit region(s). 1.3.2 Intra State transmission system (Intra-STS) Intra-STS within the state are mainly owned and operated by the state transmission utilities of each state. The Intra-STS serves the following purpose: (i) Evacuation of power from the generating stations having beneficiaries in that State. (ii) Onwards transmission within the State from ISTS boundary up to the various substations of the state grid network. (iii) Transmission within the state grid for delivery of power to the load centres within the state.806 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 1.4 PROVISIONS OF THE ‘NATIONAL ELECTRICITY POLICY’ Some of transmission related provisions of the National Electricity Policy, which have implication with regard to the National Electricity Plan, are: (i) Adequate and timely investments and also efficient and coordinated action to develop a robust and integrated power system for the country. (ii) Augmenting transmission capacity keeping in view the massive increase planned in generation and also for development of power market. (iii) While planning new generation capacities, requirement of associated transmission capacity would need to be worked out simultaneously in order to avoid mismatch between generation capacity and transmission facilities. The policy emphasizes the following to meet the above objective: (cid:1) The Central Government would facilitate the continued development of the National Grid for providing adequate infrastructure for inter-state transmission of power and to ensure that underutilized generation capacity is facilitated to generate electricity for its transmission from surplus regions to deficit regions. (cid:1) The Central Transmission Utility (CTU) and State Transmission Utility (STU) have the key responsibility of network planning and development based on the National Electricity Plan in coordination with all concerned agencies as provided in the Act. The CTU is responsible for the national and regional transmission system planning and development. The STU is responsible for planning and development of the intra-state transmission system. The CTU would need to coordinate with the STUs for achievement of the shared objective of eliminating transmission constraints in cost effective manner. (cid:1) Network expansion should be planned and implemented keeping in view the anticipated transmission needs that would be incident on the system in the open access regime. Prior agreement with the beneficiaries would not be a pre-condition for network expansion. CTU/STU should undertake network expansion after identifying the requirements in consultation with stakeholders and taking up the execution after due regulatory approvals. (cid:1) Structured information dissemination and disclosure procedures should be developed by the CTU and STUs to ensure that all stakeholders are aware of the status of generation and transmission projects and plans. These should form a part of the overall planning procedures. (iv) Open access in transmission has been introduced to promote competition amongst the generating companies who can now sell to different distribution licencees across the country. This should lead to availability of cheaper power. The Act mandates non-discriminatory open access in transmission. When open access to distribution networks is introduced by the respective State Commissions for enabling bulk consumers to buy directly from competing generators, competition in the market would increase the availability of cheaper and reliable power supply. The Regulatory Commissions need to provide facilitative framework for non- discriminatory open access. This requires load dispatch facilities with state-of-the art communication and data acquisition capability on a real time basis. While this is the case currently at the regional load dispatch centres, appropriate State Commissions must ensure that matching facilities with technology upgrades are provided at the State level, where necessary and realized not later than June 2006. (v) To facilitate orderly growth and development of the power sector and also for secure and reliable operation of the grid, adequate margins in transmission system should be created. The transmission capacity would be planned and built to cater to both the redundancy levels and margins keeping in view international standards and practices. A well planned and strong transmission system will ensure not only optimal utilization of transmission capacities but also of generation facilities and would facilitate achieving ultimate objective of cost effective¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 807 delivery of power. To facilitate cost effective transmission of power across the region, a national transmission tariff framework needs to be implemented by CERC. The tariff mechanism would be sensitive to distance, direction and related to quantum of flow. As far as possible, consistency needs to be maintained in transmission pricing framework in inter-State and intra-State systems. Further it should be ensured that the present network deficiencies do not result in unreasonable transmission loss compensation requirements. (vi) The necessary regulatory framework for providing non-discriminatory open access in transmission as mandated in the Electricity Act 2003 is essential for signalling efficient choice in locating generation capacity and for encouraging trading in electricity for optimum utilization of generation resources and consequently for reducing the cost of supply. (vii) Special mechanisms would be created to encourage private investment in transmission sector so that sufficient investments are made for achieving the objective of demand to be fully met by 2012. 1.5 PROVISIONS OF THE ‘TARIFF POLICY’ Some of related provisions of the Tariff Policy, which provide objective in development of transmission systems through transmission tariff framework, are: (cid:2) The tariff policy, insofar as transmission is concerned, seeks to achieve the following objectives: 1. Ensuring optimal development of the transmission network to promote efficient utilization of generation and transmission assets in the country; 2. Attracting the required investments in the transmission sector and providing adequate returns. (cid:2) A suitable transmission tariff framework for all inter-State transmission, including transmission of electricity across the territory of an intervening State as well as conveyance within the State which is incidental to such inter-state transmission, needs to be implemented with the objective of promoting effective utilization of all assets across the country and accelerated development of new transmission capacities that are required. 1.6 PROVISIONS IN CERC REGULATIONS In accordance with the Act, the central commission has issued regulations which entitle distribution licensees, generators, electricity traders and permitted open access customers to seek access to the inter-state transmission system. As per the present regulations access to the transmission system can be sought on short, medium or long term basis. The Central Transmission Utility (CTU) is the nodal agency for providing medium term (3 months to 3 years) and long term (12 to 25 years) access that are typically required by a generating station or a trader on its behalf. The long term access is to be granted through the transmission planning route. The nodal agency for grant of short term open access (up to three months) is the Regional Load Dispatch Centre. The nodal agency for providing transmission access to the power exchanges is the National Load Dispatch Centre. **********808 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] CHAPTER - 2 GROWTH OF TRANSMISSION SYSTEM IN INDIA 2.1 GROWTH OF TRANSMISSION SYSTEMS IN INDIA 2.1.1 Formation of State Grids for integrated planning At the time of independence, power systems in the country were essentially isolated systems developed in and around urban and industrial areas. The installed generating capacity in the country was only about 1300 MW and the power system consisted of small generating stations feeding power radially to load centres. The highest transmission voltage was 132 kV. The state-sector network grew at voltage level up to 132 kV during the 50s and 60s and then to 220 kV during 60s and 70s. Subsequently, in many states (Utter Pradesh, Maharashtra, Madhya Pradesh, Gujarat, Orissa, Andhra Pradesh and Karnataka) substantial 400kV network was also developed in the State sector as large quantum of power was to be transmitted over long distances. With the development of state grids in most states of the country the stage was set for development of regional grids. 2.1.2 Concept of Regional Planning and Integration of State Grids During the 3rd Five Year Plan, the concept of Regional planning in Power Sector was introduced. Accordingly, for the purposes of power development planning, the country was demarcated into five power Regions viz. Northern, Western, Southern, Eastern and North-Eastern. In 1964, the Regional Electricity Boards were established in each of the Regions of the country for facilitating integrated operation of State Systems in the Region and encouraging exchange of power among the States. To encourage the States to build infrastructure for exchange of such power, inter-State lines were treated as ‘centrally sponsored’ and the States were provided interest free loans outside the State Plan. 55 nos. of inter-State lines were constructed under the programme of which 13 lines were connecting States located in different Regions and this created the initial set of inter-Regional links. These lines facilitated exchange of power in radial mode among the various Regions. 2.1.3 Evolution of Regional Grids Till about 1975 the development of transmission was essentially by the State Electricity Boards/ Electricity Departments in the States and Union Territories. In 1975, to supplement the efforts of the states in increasing generation capacities, Central Sector generation utilities viz. National Hydroelectric Power Corporation (NHPC) and National Thermal Power Corporation (NTPC) were created. These corporations established large generating station for the benefit of States in a region. These corporations also undertook development of associated transmission lines, for evacuation of power and delivery of power to the beneficiary States transcending state boundaries. This gave a fillip to the formation of Regional Grid Systems and by the end of 1980s, strong regional networks came into existence. 2.1.4 Development of inter-regional links In 1989, transmission wings of Central generating companies were separated to set up Power Grid Corporation of India (POWERGRID) to give thrust to implementation of transmission system associated with Central generating stations and inter-Regional transmission programme based on perspective planning done by CEA. Till then, the generation and transmission systems in the country were planned and developed on the basis of regional self-sufficiency and the initial set of inter-regional links developed under the Centrally sponsored programme for building inter-state infrastructure of State utilities, was utilized to facilitate exchange of operational surpluses among the various Regions in a limited manner because the Regional Grids operated independently and had different operating frequencies and the power exchanges on these inter-regional links could take place only in radial mode. 2.2 DEVELOPMENT OF NATIONAL GRID The National Grid consists of the transmission system for evacuation of power from generating stations, the inter-regional links, Inter State transmission system and Intra-State transmission of the¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 809 STUs. Thus, development of national grid has been an evolutionary process. It is expected that, at the end of 12th Plan, each region in the country would be connected to an adjacent region(s) through at least two high capacity synchronous 400kV or 765kV lines and a HVDC bipole/back-to-back link. This would make the National Grid a large, meshed synchronous transmission grid where all the regional and State grids in them would be electrically connected and operating at single frequency. Following describes the evolution of National Grid. 2.2.1 Asynchronous Interconnections between Regional Grids Considering the operational regime of the various Regional Grids, it was decided around 1990s to establish initially asynchronous connection between the Regional Grids to enable them to exchange large regulated quantum of power. Accordingly, a 500 MW asynchronous HVDC back-to-back link between the Northern Region and the Western Region at Vindhyachal was established. Subsequently, similar links between Western Region and Southern Region (1000 MW capacity at Bhadrawati) and between Eastern Region and Southern Region (500 MW capacity at Gazuwaka) and between Eastern Region and Northern Region (500 MW capacity at Sasaram), were established. The capacity of Gazuwaka link between Eastern Region and Southern Region has been increased to 1000 MW. 2.2.2 Synchronization of Regional Grids In 1992 the Eastern Region and the North-Eastern Region were synchronously interconnected through the Birpara-Salakati 220kV double circuit transmission line and subsequently by the 400 kV D/C Bongaigaon -Malda line. Western Region was interconnected to ER-NER system synchronously through 400kV Rourkela-Raipur D/C line in 2003 and thus the Central India system consisting of ER-NER-WR came in to operation. In 2006 with commissioning of Muzaffarpur- Gorakhpur 400kV D/C line, the Northern Region also got interconnected to this system making an upper India system having the NR-WR-ER-NER system. In 2007 NR was also synchronously interconnected with WR through Agra-Gwalior 765kV S/C line-1 operated at 400kV level. 2.2.3 All India Planning and Evolution of Integrated National Grid Since the advent of the current century, the focus of planning the generation and the transmission system in the country has shifted from the orientation of regional self-sufficiency to the concept of optimization of utilization of resources on all-India basis. Generation planning studies carried out by CEA had indicated that the capacity addition planned on all-India basis is less than that planned on regional basis. Further, a strong all-India integrated national grid enables harnessing of unevenly distributed generation resources in the country. Recognizing the need for development of National grid, thrust was given to enhance the capacity of inter-regional links in a phased manner. Total inter- regional transmission capacity by the end of 9th Plan was 5750 MW. During 10th Plan i.e. 2002-07, a total of 8300 MW of inter-regional capacities were added. In this effort, major achievements were - addition of Talcher-Kolar HVDC Bipole, second module of HVDC back-to-back system between SR and ER at Gazuwaka, HVDC back-to-back system between NR and ER at Sasaram, synchronous inter-connection of NER/ER grid with WR grid by Rourkela-Raipur 400kV D/C line, synchronous inter-connection of NER/ER/WR grid with NR grid by Muzaffarpur-Gorakhpur 400kV D/C (quad) line and subsequently, one circuit of Patna-Balia 400kV D/C (quad) line and Agra-Gwalior 765kV transmission line (operated at 400kV). Total inter-regional transmission capacity by the end of 10th Plan was 14050 MW and increased to 27750 MW by end of 11th Plan (i.e. March 2012). Details of inter-regional links that are expected to be implemented during 11th Plan period are given in Chapter-6, and those under-construction/ planned for 12th Plan period are given in Chapter-7. 2.3 GROWTH OF TRANSMISSION SYSTEM IN PHYSICAL TERMS There has been a consistent increase in the transmission network and transformation capacity in India. This increase is in consonance with increase in generation and demand of electricity in the country. The increase in the transmission lines of 220kV and above voltage levels, in terms of circuit kilometres, have been roughly five times in last 26 years and that for substation capacity more than810 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] eight times in the same period. There has been more increase in the transmission system at higher voltage levels and substation capacities. This aspect of growth in transmission highlights requirements of transmission network to carry bulk power over longer distances and at the same time optimize right of way, minimize losses and improve grid reliability. 2.3.1 Growth in transmission lines Cumulative growth in transmission lines, of 220kV and above voltage levels, since end of 6th five- year plan (i.e. March 1985) to 11th Plan (i.e. March 2012) is depicted below: Growth of Transmission Lines(ckm) at the end of each Plan: Voltage level 6th Plan 7th Plan 8th Plan 9th Plan 10th 11th Plan Plan 5250 765kV 0 0 0 971 2184 HVDC Bipole 0 0 1634 3138 5872 9432 400kV 6029 19824 36142 49378 75722 106819 220kV 46005 59631 79600 96993 114629 135980 Total ckm 52034 79455 117376 150480 198407 257481 GGGGrrrroooowwwwtttthhhh ooooffff TTTTrrrraaaannnnssssmmmmiiiissssssssiiiioooonnnn LLLLiiiinnnneeeessss 300000 250000 200000 150000 100000 50000 0 6th Plan 7th Plan 8th Plan 9th Plan 10th Plan 11th Plan PLAN ddddeeeeddddddddaaaa mmmmkkkkcccc llllaaaattttooooTTTT¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 811 2.3.2 Growth of Substations Cumulative growth in transformation capacity of substations and HVDC terminals, of 220kV and above voltage levels, since end of 6th five-year plan(i.e. March 1985) to 11th Plan (i.e. March 2012) is depicted below: Growth of Substations (MVA/ MW) at the end of each Plan: 6th 7th Plan 8th Plan 9th Plan 10th Plan 11th Plan Plan 25000 765kV 0 0 0 0 0 HVDC Bipole 0 0 0 5000 8000 9750 151027 400kV 9330 21580 40865 60380 92942 223774 220kV 37291 53742 84177 116363 156497 Total MVA/MW 46621 75322 125042 181743 257439 409551 GGGGrrrroooowwwwtttthhhh ooooffff SSSSuuuubbbbssssttttaaaattttiiiioooonnnnssss 450000 400000 350000 300000 250000 200000 150000 100000 50000 0 6th Plan 7th Plan 8th Plan 9th Plan 10th Plan 11th Plan PLAN 2.4 LANDMARK EVENTS FOR TRANSMISSION SECTOR Development of the transmission network has been done in tandem with growth in generation capacity. The growth in transmission system is characterized by the physical growth in transmission network as well as introduction of higher transmission voltages and new technologies for bulk power transmission. Landmark events of this growth are: 1948 Electricity (Supply) Act 1948. The Act provided for establishment of the Central Electricity Authority (CEA) and the State Electricity Boards 1950-60 Growth of State Grids and introduction of 220kV voltage level WWWWMMMM////AAAAVVVVMMMM llllaaaattttooooTTTT812 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 1964 Constitution of Regional Electricity Boards 1965-73 Interconnecting State Grids to form Regional Grid systems 1977 Introduction of 400kV voltage level 1980-88 Growth of Regional Grid Systems as associated transmission system with Central Sector generation 1989 HVDC back-to-back System 1990 Introduction of HVDC bi-pole line 1992 Synchronous inter-connection of ER and NER 1999 Transmission planning re-oriented towards all-India system 2000 Introduction of 765kV transmission line (initially charged at 400kV) 2003 - Electricity Act 2003 - ABT with real time settlement mechanism implemented in all the five electrical regions creating the basic infrastructure for the operation of an electricity market. - Synchronous inter-connection of WR with ER-NER system - Bulk inter-regional HVDC transmission system (Talcher – Kolar HVDC link) 2004 Open access in transmission 2006 Synchronous inter-connection of NR with ER-NER-WR system 2007 765kV operation of Sipat Substation 2007 765kV operation of 765kV transmission lines 2010 Notification of POSOCO – for operation of RLDCs/NLDC as a separate organization from CTU 2011 Implementation of point-of-connection based method for sharing transmission charges and losses all across the country. **********¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 813 CHAPTER - 3 TRANSMISSION PLANNING PHILOSOPHY 3.1 TRANSMISSION PLANNING PHILOSOPHY Transmission planning philosophy in India has evolved over last few decades keeping pace with developments and needs of the electricity sector. The transmission planning has been aligned with the Electricity Act 2003, National electricity policy, tariff policy, regulations and market orientation of the electricity sector. The objectives, approach and criteria for transmission planning, which evolved in time, take care of uncertainties in load growth and generation capacity addition while optimizing investment in transmission on long term basis. These objectives, approach and criteria are kept in view while planning transmission addition requirements to meet targets for adequacy, security and reliability. Transmission plan is firmed up through system studies/analysis considering various technological options and the transmission planning philosophy. 3.2 PLANNING OBJECTIVES Following objectives are taken into account while planning and developing optimal transmission system in India. (1) Even development: Development of transmission system across the country so that all areas could have adequate level of electricity system irrespective of uneven disposition of electric power generating sources, including renewable energy sources, in the country. (2) Optimum utilisation of generation resources: Adequate transmission system development so as to optimally utilise the hydro-thermal mix of generation resources taking into account the concentration of coal in the eastern part of the country and hydro power sources in the north - eastern and northern parts of the country. (3) Harnessing diversity in regional peak demand: Obtaining advantages of diversity based exchanges of power; that is, exchanges on account of regional variations in generation and demand pattern arising due to geographical, seasonal, time of day and operational diversities. (4) Providing flexibility for implementation: The Central Transmission Utility (CTU) and the State Transmission Utility (STU) are responsible for planning and development of the transmission system. National Electricity Plan prepared by the Central Electricity Authority serves as guiding document in this process. The Central Transmission Utility is responsible for inter-state transmission of electricity. The State Transmission Utility is responsible for transmission of power within the state. The Central Transmission Utility would have to coordinate with the State Transmission Utilities and the other stakeholders for preparing a well-coordinated transmission plan for the country. As the generation sector has been de- licensed, the actual development may be at variance with respect to the programme indicated in National Electricity Plan. The transmission development programme would accordingly need to be reworked from time to time. Therefore, in the long run there could be deviations from the National Electricity Plan. With the emergence of new generating stations, the transmission system associated therewith would have to be quickly planned and executed. (5) Facilitating trading: Transmission system to facilitate trading of electricity, which under the Electricity Act, 2003, has been recognized as a distinct activity. It is expected that in consequence of this and the non-discriminatory open access on the transmission system, market forces may influence the pattern of power flows requiring reassessment of adequacies/ inadequacies in the transmission network. For the need arising from trading in electricity, suitable system strengthening (to be taken up from time to time), and aligned with the perspective transmission plan would be required to be taken up by the Central Transmission Utility and the State Transmission Utilities in coordination with CEA. (6) Technology and cost optimization: Optimum development of transmission network based on feasibility analysis and techno-economic evaluation of technology options such as Extra High Voltages, AC, HVDC, hybrid, multi-circuit/multi-conductor lines, GIS, reactive compensation, dynamic compensation, etc. The objective should be to optimize cost of transmission system by use of technology. (7) Right of Way optimization: With the all round development of our country and the increase in population, difficulty in obtaining corridors for power transmission has been increasing. Therefore, there is a need to optimize the power transmission corridors. Use of high capacity lines, multi circuit lines and increasing transmission capability of existing lines through use of re-conductoring using aluminium–alloy conductors or series compensation and flexible814 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] alternating current transmission systems (FACTS) devices where optimal, are to considered in the planning stage. (8) Stage wise development: As generating capacity is built up in stages, the transmission capacity would also have to be built up in stages. Stage wise development of transmission capacity could be done by charging a higher voltage specification line at lower voltage initially, or by stringing circuits of multi-circuit line in phased manner or by use of series compensation at a later date on a line built with high current capacity conductors etc. (9) High capacity corridors from NER: The North-eastern Region of the country has hydro potential of the order of 30-35 GW most of which is yet to be developed. Development of this hydro potential alongwith industrial development in the North-Eastern Region(NER) is required so that increasing availability of power in the region is matched with growth in local demand. However, as the hydro potential in the NER is quite large (almost 70% of all future hydro power would come from NER), substantial power from this region would be required to be transmitted to Northern, Western and Southern regions where the growth in demand is much higher as compared to potential for local development of generation resources in those regions. In addition, power from Bhutan would also need to be transmitted towards NR/WR/SR. As the Eastern region(ER) is in surplus and with development of further generation projects in ER utilising the coal reserves in that area, the ER will continue to be an exporting region. Thus the bulk of NER power would be transmitted directly to NR/WR/SR over distances exceeding 2000 km. Considering the right of way constraints in the chicken- neck area and also to conserve the over-all right of way, high capacity transmission system consisting of hybrid network of HVDC and high capacity 400kV AC would be required to be developed. This development would need to be properly phased to match with the programme of development of hydro generation in NER. For bringing power from NER, a higher voltage of + 800kV HVDC has been considered. Reduction in losses and optimisation of right of way are the main objectives of adopting higher voltages. (10) Full utilization of the generating capacity in Pit-head and Coastal Areas: For the full utilization of the capacity from cluster of generation projects mainly in pit-head and coastal areas, high capacity transmission system up to load centers in the country have to be planned keeping in view long distance of transmission, ROW optimization, operational flexibility of grid and the aim that no generating capacity is rendered idle due to transmission constraints. (11) Continued development of Regional Grids: Continued development of regional grids so as to meet the transmission needs within each of the regions. The development should cater to the power evacuation from generation capacity additions and strengthening in the regional grids addressing specific requirements of the area. It should provide transmission system to cater to changes in the pattern of power flows for inter-state transmission arising on account of capacity additions for intra-state benefits. The system should be strengthened to overcome the deficiencies and provide long term solution. (12) A strong All India Grid: Formation of strong All India Grid is a flagship endeavour to steer the development of Power System on planned path leading to cost effective fulfilment of the objective of ‘Electricity to All at affordable prices’. A strong All India Grid would enable harnessing of unevenly distributed generation resources in the country to their optimum potential. This together with open access in transmission would facilitate market-determined generation dispatches, thereby resulting in supply at reduced prices to the distribution utilities and ultimately to consumers’ benefit. (13) Grid substations where demand exceeds 300 MW: Delivery of power to the states is an important component of transmission system. The endeavour could be to provide ISTS / State grid substations (preferably a 400kV grid substation) at places where demand exceeds 300 MW. This would also enable spread of high capacity grid in India. (14) Development of matching transmission system at 220kV and 132kV: Development of matching transmission system at 220kV and 132kV and also the sub-transmission and distribution system so as to cater to the load growth and ensure proper utilisation of development in generation and transmission facilities for the ultimate goal of delivery of the services up to the end consumers in the country. 3.3 CHALLENGES IN TRANSMISSION PLANNING FOR MERCHANT PLANTS 3.3.1 Enactment of the Electricity Act, 2003 has opened up hitherto constrained electricity market which was characterized by long term PPAs and inability of Distribution Companies and consumers to have a choice of suppliers. Besides, de-licensing generation and removing controls on captive¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 815 generation, the Electricity Act 2003 makes it mandatory for the transmission licensee to provide non- discriminatory open access to its transmission system for use by any licensee or generating company for wheeling its power on payment of transmission charges. This creates enabling environment for competition among generators/traders to choose their customers and vice-versa. 3.3.2 The Act has also liberalized setting up of generating stations and any generating company can establish, operate and maintain a generating station. As a result, a large number of IPPs are setting up generating stations with the aim of selling power in various segments of the electricity market viz. long-term, medium-term, short-term, bilateral or day-ahead power exchange. During the 11th Plan, about 23,000 MW generating capacity was added through private sector. The contribution of the private sector i.e. Independent Power Producers (IPPs) during the 12th Plan may be of the order of about 50,000 MW. The magnitude of long term access (LTA) applications received by the CTU confirms this trend. 3.3.3 There is no firm knowledge of the perspective beneficiaries or delivery point when the transmission planning is taken up and for a number of generation projects and only target regions/ beneficiaries is known at the time of transmission planning. Under such scenario there is need to create adequate transmission infrastructure in time so that the new generating capacity is not bottled up after commissioning. Planning transmission in such a high uncertainty is a challenging task. There are dangers of transmission congestion at the prospective points of drawal or having stranded transmission assets for some time. 3.3.4 Based on application by a generator for Long Term Access, the transmission system is planned for evacuation of power from generating stations. The system planning studies are carried out considering projected load in accordance with forecasts of Electric Power Survey (EPS) and actual growth of the load in a State/region. The loads of various States are assumed irrespective of any PPAs. Thus, in this process, adequate inter-state transmission capacity gets created for evacuation of power from the generation project. However, delivery of their power to their actual beneficiaries may face some constraint. Further, adequate intra-state transmission system is also required to absorb power injected from ISTS. 3.3.5 During the planning process, some design margins get created in the network generally due to long term optimisation. These margins, alongwith operational and reliability margins which are variable in nature and depend upon system conditions and load flow pattern at that time provide sufficient additional capacity in the system for States to buy power more than their long-term PPAs. However, these margins can be utilized only up to a limit and may result into congestion if States start buying power in much excess of their forecasted requirements. 3.4 LEARNING FROM RECENT EXPERIENCE 3.4.1 In order to develop an optimum and secure transmission grid, the transmission planning criteria should fix some ground rules for market players as well. In this regard, the following are suggested for future planning: (i) Interim connectivity by LILOing the lines or otherwise should be avoided as far as possible. It disturbs power flow patterns, reduces reliability and can cause overloading of the transmission lines. At the most it may be allowed for drawl of power for pre-commissioning activities and not for injecting power. (ii) Request for connectivity and long term access need to be processed simultaneously. Requisite system strengthening can be carried out as part of long term access only. Connectivity without LTA can cause overloading of the transmission grid. Provision of connectivity free of cost is a perverse incentive for the applicants to avoid seeking LTA. (iii) In the last few years considerable ISTS systems have been planned and implemented based on the applications of IPPs giving only target regions for drawal. As per CERC regulations, the applications were required to identify the points of drawal (State periphery) at least 3 years prior to COD, which the IPPs have generally not complied. This is a matter of concern in the context of transmission congestion particularly at the drawal end as well as for grid security. The eleven high capacity corridors were planned on this basis and CERC had given go head for implementation while simultaneously keeping a watch on the progress of generation projects. In the interest of optimum transmission planning there is a need to review this approach for transmission planning for long term transmission access applicants. It is proposed that in future, applications by the generators for LTA should be processed with firm knowledge of points of injection and drawal for at least 85% capacity, based on long term PPAs, as is the case with central generating stations like NTPC, NHPC etc. The rationale for the above suggestion is as follows:816 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] (cid:2) Experience tells that it is possible to plan a robust transmission system with 15% unallocated capacity or merchant capacity which is the same thing from a transmission perspective. (cid:2) If 85 % power is tied up in long term PPAs (based on regulated tariff or bid tariff), ISTS can be planned and implemented up to the electrical boundary of each State and the STU can also be taken into the loop for coordinated development of STU network. (cid:2) It is desirable that DISCOMS secure their base load demand through long term PPAs. Only seasonal demand and day-to-day balancing requirement should be met from the short term market because there is volatility in price in short term market. The short term supply comes from the aggregation of merchant capacity, captive plants, co-generation plants, surplus DISCOMS and State Governments vested with free hydro power. Hence only small doze of merchant capacity is required for liquidity of supply. The short term market which provides balancing supply is essential for grid stability and is an alternative to Unscheduled Interchanges. On the other hand a large quantum of merchant power/united capacity can potentially cause transmission congestion and put pressure on the grid security. 3.4.2 Dedicated transmission line(s) from a generating station should be radial in nature. Multiple dedicated lines from the same station to more than one grid point should not be planned. 3.4.3 As per section 39 of the Electricity Act, STUs need to carry out their planning function related to intra-state transmission in coordination with the CEA and CTU. There have been a few instances in the past where, the STU has planned important transmission system or allowed connectivity to large generation capacities without involving CEA and CTU and this may result in congestion/operational difficulties for the ISTS/national grid. To start with, it is proposed that STU should evolve following of their systems involving CEA and CTU, which would subsequently be firmed up through the Standing Committee forum:- (a) 400 kV and above system (b) Large scale harnessing of renewable generation (c) System for evacuation of power from a complex having generation capacity of 500 MW above. 3.5 HIGHLIGHTS OF TRANSMISSION PLANNING CRITERIA Transmission planning should aim at achieving an acceptable system performance and reliability requirements. These reliability requirements are specified in the Manual on Transmission Planning Criteria (1994) and updated in the National Electricity Plan (2007) notified by Government of India. Highlights of the transmission planning criteria are: (1) The transmission system should be planned in an integrated manner. (2) The optimization should include the total network including inter-state and intra-state transmission system. (3) The National Grid should facilitate free flow of power across the regional boundaries. (4) In the national approach, N-2 criteria may be adopted for testing the adequacy of transmission system from large generating complex (3000 MW or above) and multi line corridors (3 D/C lines or more), on case to case basis. Whereas, regional planning may be continued with N-1 criteria. However, while N-1 would be applied to test transmission adequacy without necessitating load shedding or rescheduling of generation during steady state operation, N-2 would be applied to test without necessitating load shedding but could be with rescheduling of generation during steady state operation. (5) Inter-regional exchanges and inter-connection capacity on account of plant mix considerations, generation shortages due to forced outages, diversity in weather pattern, variation in renewable energy generation and load forecasting errors in regions shall also be considered in the studies. (6) Inter-regional exchange with a combination of surplus and deficit scenarios for different regions maximizing surplus in surplus region and deficit in deficit region to be considered in evolving National Grid.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 817 (7) The adequacy of the transmission system should be tested for different load generation scenarios corresponding to one or more of the following so as to test the scenario of maximum burden on the transmission system: (cid:2) Summer Peak Load; (cid:2) Summer Off-peak Load; (cid:2) Winter Peak Load; (cid:2) Winter Off-peak Load; (cid:2) Monsoon Peak Load; (cid:2) Monsoon Off-peak Load; (8) Dispatch scenarios for maximizing transfer in specific inter-regional corridors should be considered to determine the adequacy of transmission system to take care of requirement of regional diversity in inter-regional export / import. (9) Sensitivity in respect of generation dispatch or load demand should be studied so as to study the possibility of increased burden on transmission system. (10) Size and number of interconnecting transformers (ICTs) to planned in such a way that outage of any single unit does not over load the remaining ICTs or the underlying system. (11) As a general rule, the ISTS shall be capable of withstanding and be secure against the following contingency outages: (a) Withstand without necessitating load shedding or rescheduling of generation during steady state operation – - Outage of a 132kV D/C line, or - Outage of a 220kV D/C line, or - Outage of a 400kV S/C line, or - Outage of a 400kV S/C line with series compensation, or - Outage of single Interconnecting Transformer, or - Outage of one pole of HVDC Bipole line, or - Outage of a 765kV S/C line without series compensation (b) Withstand without necessitating load shedding but could be with rescheduling of generation during steady state operation - - Outage of a 400kV S/C line with TCSC, or - Outage of a 400kV D/C line, or - Outage of both poles of HVDC Bipole line, or - Outage of a 765kV S/C line with series compensation. (12) The above contingencies shall be considered assuming a pre-contingency system depletion (Planned Outage) of another 220kV D/C line or 400kV S/C line in another corridor and not emanating from the same substation. All the Generating Units may operate within their reactive capability curves and the network voltage profile shall also be maintained within voltage limits specified. For requirement of reliability, planning criteria for evacuation system for Nuclear power station that is being adopted is to consider outage of one circuit assuming pre-contingency depletion of another circuit from the same station. This is effectively N-2 without rescheduling but with no other pre-contingency. (13) EHV substation of 132 kV or above is to be planned with at least two transformers such that failure of one transformer shall not affect the power supply of a particular area. (14) Large cities with a power demand of 2000 MW or above shall also adopt N-2 criteria for supply of reliable & quality power. (15) Inter-regional transmission capacity should be adequate to meet outage of large machine in the importing region along with the outage of one S/C inter-regional line between the respective regions. **********818 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] CHAPTER - 4 PLANNING AND DEVELOPMENT PROCESS 4.1 COORDINATED PLANNING AND STANDING COMMITTEES FOR POWER SYSTEM PLANNING (SCPSP) Optimum development of transmission system growth plan requires coordinated planning of the inter State and intra-State grid systems. In respect of development of ISTS, the focus mainly is the interface of ISTS and State grid at drawal point of the State and the ability of ISTS to deliver this power and provide additional reliability to the State grid. In respect of development of Intra-STS, the focus is to enhance ability of State grid to transmit power drawn from ISTS and its own generating stations up to its load centres. The process of integrated planning is being coordinated by the Central Electricity Authority as part of its functions and duties under Section 73(a) of the Electricity act 2003. To fulfil this objective and carry out integrated planning through coordination and consultation with transmission utilities and other stake-holders, CEA has constituted Regional Standing Committees for Power System Planning(SCPSP) to firm up transmission addition proposals. These Standing Committees for Power System Planning have representation of CEA, CTU, STUs of the constituent States, Regional Power Committee (RPC) of the concerned region and representatives of Central Sector Generating Companies in the region. The inter-state transmission system developed either for evacuation of the generation or for system improvement is discussed in the SCPSP of respective region(s). Transmission addition requirements arising out of Long Term Access (LTA) applications are also discussed and firmed up by the SCPSP in the presence of the applicants. Combined meeting of all the regions is held to discuss common issues. 4.2 FORMULATION OF TRANSMISSION SCHEMES Planning of the transmission system for a particular timeframe takes into account the plans formulated by CEA and the generation projects being taken up for execution in that timeframe. The transmission system requirement covers the power evacuation system from the generation projects and system strengthening of the network for meeting the load growth in that time frame. The transmission system is evolved keeping in view the overall optimization on a National level. In this process the total investment in transmission including the inter-state as well as intra-state system is optimized. Based on the perspective plan developed by CEA and depending upon as to which generations are likely to be available during the next 2-3 years and taking into account the load growth in particular areas, CTU or STUs have to prioritize, review (if required) and take up their transmission system expansion programme for implementation. 4.3 IMPLEMENTATION OF TRANSMISSION SCHEMES (ISTS) In respect of ISTS, after firming up of the transmission proposals in the SCPSP and considering schedule of commissioning of associated generating station, CTU and CEA take up the proposal to the Empowered Committee for consideration of its implementation. As recommended by the Empowered committee and after consideration by the Government of India, the transmission schemes are implemented either through the tariff based competitive bidding process or under cost- plus mechanism with regulated tariff by POWERGRID as the CTU in accordance with provisions of the Tariff Policy. 4.4 INTRA STATE TRANSMISSION SYSTEM PLANNING AND DEVELOPMENT The intra-state transmission system (Intra-STS) is to be developed by the State utilities. Their network planning, scheme formulation and the programme of intra-state transmission development have to take into account the transmission system requirements for evacuation of power from state sector and private sector generation projects for intra-state benefit, absorption of power made available through ISTS, meeting the load growth in different areas of the State and improve the reliability of their system. For a coordinated development process aiming at perspective optimization in meeting the growth targets, it would be appropriate that the State Transmission Utilities prepare their State Electricity Plans taking advantage of development plans for regional grid system and focusing on the specific requirements of the concerned State. 4.5 TRANSMISSION PLANNING STUDIES 4.5.1 Studies and Analysis for Transmission Planning In the planning phase, transmission requirements for generation projects and system reinforcement needs are evolved, based on detailed system studies and analysis keeping in view various¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 819 technological options, planning criteria and regulations. These studies/analysis are problem-specific, that is, in a particular exercise, only a sub-set of the analysis/studies may be necessary. The type of major system studies and analysis that are considered in the exercise are as follows: (cid:3) Demand – Generation analysis (cid:3) Power flow studies (cid:3) Contingency Studies (cid:3) Short circuit studies/ Fault analysis (cid:3) Voltage stability studies (cid:3) Transient and long duration dynamic stability (cid:3) Techno-economic analysis 4.5.2 Pre-requirements Following data /information is needed for carrying out various system studies/analysis under the transmission planning process: (cid:3) Data on existing system (cid:3) Load forecast (cid:3) Generation expansion plan (cid:3) Seasonal load-generation scenario (cid:3) Network expansion options (cid:3) Transmission planning criteria (cid:3) Technological options (cid:3) Act, Regulations, Policies 4.6 TECHNOLOGICAL OPTIONS The various technological options that are available now for 12th /13th Plan time frame are given below. Consideration of these options is problem-specific, that is, in a particular exercise, only a limited number of options may be relevant. (cid:3) 220kV AC, 400kV AC, 765kV AC, 1200kV AC (cid:3) HVDC/UHVDC ( +500kV, +600kV, +800kV) (cid:3) Hybrid model (AC with HVDC system) (cid:3) High capacity lines with high conductor temperature option (cid:3) Series compensation, dynamic reactive power compensation- TCSC, SVC, STATCOM/FACTS **********820 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] CHAPTER - 5 NEW TECHNOLOGIES AND SMART GRID 5.1 THE CHALLENGES IN DESIGN AND OPERATION OF NATIONAL GRID In order to meet the growing power demand of various regions, power transfer capacity of the grid is required to be enhanced continuously. This expansion poses few challenges that need to be met through planning and adoption of new technologies. Following are some of the challenges: (cid:2) Right Of Way (ROW): It is the most notable challenge that the transmission sector is facing today. The need is to develop high intensity transmission corridor (MW per meter ROW) in an environmental friendly manner. (cid:2) Reduction in land for substation: With scarce land availability there is a growing need for reduction of land use for setting up of substations systems, particularly in Metros, hilly and other urban areas. (cid:2) Flexibility in Line Loading and Regulation of Power: Due to wide variation in demand on daily as well as seasonal basis there is increased need to regulate power flow on the transmission network for grid security and optimization. (cid:2) Improvement of Operational Efficiency: Power system is required to be operated at the rated capacity with security, reliability and high availability. This can only be achieved through reliability based on-line condition monitoring, repair and maintenance in advance and making forced outage as zero. 5.2 ADOPTION OF NEW TECHNOLOGIES Following new technologies are being implemented to meet above challenges: (cid:2) Increase in transmission voltage: Power density at different voltage level increases with increase in voltage. It is 3 MW/m for 132kV and 45 MW/m for 765kV. Transmission voltages upto 765kV levels are already in operation. A ±800 kV, 6000 MW HVDC system as a part of evacuation of bulk power from North Eastern Region (NER) to Northern Region (NR) over a distance of around 2000 km is under implementation. In addition, increasing the AC voltage level at 1200kV level has been planned. Research work for 1000kV HVDC system has also been commenced. (cid:2) Upgradation of transmission line: Upgradation of 220kV D/C Kishenpur- Kishtwar line in J&K to 400 kV S/c, which was first time in India, has resulted in increase of power transfer capacity of the exist transmission corridor with marginal increase in ROW (from 35m to 37m). (cid:2) Upgradation of HVDC Terminal: Upgradation of Talcher(ER) – Kolar(SR) ±500kV HVDC terminal from 2000MW to 2500MW has been achieved seamlessly without changing of any equipment. That has been achieved with enhanced cooling of transformer and smoothing reactor with meagre cost. (cid:2) High capacity 400kV multi-circuit/bundle conductor lines: POWERGRID has designed & developed multi circuit towers (4 Circuits on one tower with twin conductors) in-house and the same are implemented in many transmission systems, which are passing through forest and RoW congested areas e.g. Kudankulam and RAPP-C transmission system. (cid:2) High Surge Impedance Loading (HSIL) Line: In order to increase the loadability of lines, development of HSIL technology is gaining momentum. POWERGRID is building up one HSIL line viz. 400kV Meerut – Kaithal D/c where SIL is about 750 MW as against nominal 650MW for a normal quad bundle conductor line. (cid:2) Compact towers: Compact towers like delta configuration, narrow based tower etc. reduce the space occupied by the tower base are being used. First 765kV Sipat – Seoni 2xS/c line with delta configuration tower is under operation. Further, 400kV Pole structure is also being used in high population density areas. Pole type structures with about 1.85 m base width as against 12-822 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] control of such large grid. The wide spread grid and increasing complexities in its operation and of electricity market requires wide area monitoring which may only be possible by application of emerging synchrophasor technology. WAMS (Wide Area Measurement System) based technology is the key for achieving grid performance that is expected in this changed scenario. WAMS requires installation of Phasor Measurement Units (PMUs) at the substations and power plants. The existing SCADA/EMS based grid operation has the capability to provide only steady state view of the power grid. PMU based technology with synchrophasor measurements over wide-area facilitate dynamic real time measurements and visualization of power system which are useful in monitoring safety and security of the grid as well enable in taking control/corrective actions. Developments in WAMS and other technologies in the field of measurements, communication, control & automation, advanced meters, IT infrastructure, energy storage etc. have prominent role towards successful development of Smart Grid. 5.3.2 About PMU and WAMS technologies Phasor & synchrophasor technology: A phasor is a complex number that represents both the magnitude and phase angle of the sine waves found in AC system. Phasor measurements that occur at the same time are called "synchrophasors" and can be measured precisely by the Phasor Measurement Units(PMUs). PMU measurements are taken at high speed typically 25 or 50 samples per second – compared to one every 4 to 10 seconds using conventional technology. Each measurement is time-stamped according to a common time reference. Time stamping allows synchrophasors from different locations to be time-aligned (or synchronized) providing combined and comprehensive view of the entire grid. A typical PMU installation as a part of wide area monitoring system (WAMS) network consists of PMUs dispersedly placed throughout the electricity grid at strategic locations in order to cover the diverse footprint of the grid. A Phasor Data Concentrator (PDC) at central location collects the information from PMUs and pass it to Supervisory Control and Data Acquisition (SCADA) system after time aligning the same. The WAMS network requires high bandwidth communication backbone for rapid data transfer matching the frequency of sampling of the PMU data. Phasor Data Concentrator(PDC): The electrical parameters measured by number of PMUs are to be collected by some device either locally or remotely, this function is performed by Phasor Data Concentrator(PDC). A PDC forms a node in a system where phasor data from a number of PMUs is collected, correlated and fed as a single stream to other applications. In a hierarchal set up the PDCs can also be used to collect the data from number of down stream PDCs. PDC provides additional functions like - quality checks on the phasor data and inserts appropriate flags into the correlated data stream, checking disturbance flags and recording files of data for analysis, monitoring overall measurement system and providing display and record of performance, etc. Wide Area Monitoring System (WAMS): Emerging technologies like WAMS using Phasor measurement units (PMUs) is advanced measurement system that provides synchronized measurements at a very fast rate. The WAMS technology provides real time phasor measurements in terms of amplitude and phase angle which are utilized for better visualization & help to increase the situational awareness of power system operators. The WAMS technology is the main building block towards Smart Grid development in Transmission System. The components of WAMS are Phasor Measurement Units (PMUs), Phasor Data Concentrators (PDCs), Visualization aids, Application and Analysis modules, data archiving and storage etc. The basic building block of WAMS technology is PMU, wide-band communication and PDC. The installation of PMUs has been taken up in many countries as a starting point to gain experience with this technology and these installed PMUs are later integrated with the larger implementation of PMUs. Most programs for WAMS technology world over have three stages to implement phasor technology. The initial stage is to collect and archive phasor and frequency data from important locations throughout the grid using PMU to determine the topology and operating limits. In Second stage, the data gathered along with real-time phasor and frequency measurements to calculate grid¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 823 conditions using analytical functions to make suggestions to grid operator to keep grid stable and reliable. The third and final stage is to do all of the above automatically without human intervention. 5.3.3 Synchrophasor applications worldwide Worldwide many utilities from North America, Europe, China, Russia and Brazil etc have started using/developing this new technology to harness the unexplored benefits in operating large electrical grids. In 2006, China's Wide Area Monitoring Systems (WAMS) for its six(6) grids had 300 PMUs installed mainly at 500kV and 330kV substations and power plants. Presently China has installed more than 1000 PMUs in their Grid and have plans to put PMUs at all 500kV substations and all power plants of 300MW and above. In U.S there are ten(10) synchrophasor projects underway involving 57 utilities and grid operators across the country and installing about 850 networked PMUs. By 2013, the devices will be operating in nearly all regions of the country. The Eastern Interconnect Phasor Project (EIPP) (now known as the North American Synchrophasor Initiative, or NASPI), has over 40 connected phasor measurement units collecting data into a "Super Phasor Data Concentrator" system centered at Tennessee Valley Authority (TVA). Southern California Edison is successfully using synchrophasors today to trigger some automated grid protection functions on their system. The Oklahoma Gas & Electric Co.(OG&E), USA uses synchrophasor technology to determine if a disturbance is cleared by high-speed or step-distance(delayed) tripping. The data is being used to locate the source of event disturbance and proceed with an investigation. Another valuable use of synchrophasor data is the detection of equipment failure, most of which is not detectable by SCADA system. System stability assessment is being carried out using synchrophasor data especially capturing the intricacies of an interconnected system like low frequency oscillations due to generation control problem or other reasons. Apart from above nations, other countries like South Africa, Brazil, Russia, Western Electricity Coordinating Council (WECC) whose service territory extends from Canada to Mexico and some European countries are also planning to deploy PMUs in the system. 5.3.4 Present PMU project in India and its benefits The process for installation of PMUs has already been started and nine (9) PMUs (at Moga, Kanpur, Dadri and Vindhyachal in first phase and Agra, Bassi, Hisar, Kishenpur and Karcham Wangtoo in second phase) have already been commissioned in Northern Region with a Phasor data concentrators (PDC) at NRLDC. Phasor data at each PMU is being sampled at 25 samples per second with GPS time stamping and transferred to phasor data concentrator (PDC) provided at NRLDC through dedicated 64Kbps fiber optic communication link. The phasor data received from all the locations is merged and time aligned in the PDC. The time aligned data from PDC is provided to operator console for visualization. PDC data is also fed to a data historian provided at NRLDC. Data from historian can be made available to external database through ODBC (Open Database Connectivity) and spreadsheet for further analysis. PDC has also been provided with OPC (Object Linking & Embedding for Process Control) server in order to transfer real time phasor data to existing SCADA system. With the commissioning of Northern Region pilot project, Phasor data from different locations is available at NRLDC and its existing SCADA system. From the phasor data, load angle between different pockets of the grid is available more accurately with updation time of order of few milliseconds and this enhances the capability of the tools available to grid operator. The data historian provided is collecting concentrated data from PDC and shall be useful for post event analysis of any grid incidences. In the past data has also been utilized to observe low frequency oscillations and checking effectiveness of system integrated protection scheme(SIPS) operations. 5.3.5 Plan for WAMS based Smart Transmission Grid in India Proposal for installation of PMUs in other regions is also in the pipeline. Full implementation of WAMS technology would require installation of PMUs in each region (about 1500-1700 PMUs initially in XII Plan in India) and reliable communication network with very high band width and with least latency. Phasor data concentrators (about 50-60 in XII Plan) are proposed to be installed along with PMUs at various strategic grid locations and control centres. The State Load Despatch Centres824 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] may have Master PDCs and National and Regional Load Despatch Centres may have a Super PDCs working in hierarchy for real time dynamic state monitoring of the complete National Grid in a unified manner. This concept is depicted in following schematic diagram: Back up NLDC NLDC Super PDC Remote Console at RPCs at RLDCs Master PDC at SLDCs Nodal PDC at sub-station Nodal PDC at sub- station State Stns State Stns Centre Stns Router/switch Router/switc Router/switch PMU PMU PMU PMU PMU PMU 1 n 1 n 1 n Sub Stn A Sub Stn B Sub Stn B In view of large number of PMUs and PDCs required in India, it would be beneficial if we have indigenous capability for their manufacturing and testing in the country. 5.3.6 Need for fibre optic based communication system Reliable voice and data communication has become critically important. The requirement of effective communication system has increased with the advent of special protection schemes, wide area measurement technology, SCADA system and remote operation. Getting real time data of various power system elements i.e. substations, generating plants, HVDC links, Interstate transmission lines etc. has become an essential prerequisite for successful operation of modern power system as a ‘Smart Transmission Grid’. Presently three modes of communication are being used viz, PLCC, Microwave and Fibre optic in power system operation. The Microwave links operating in 2.3 - 2.5 GHz band is being withdrawn by Ministry of Communication. The PLCC is considered an integral part of power system and its usage for power system are protection of the power system and providing speech communication in limited area. All these requirements can be met by optic fibre communication (OFC). 5.3.7 Possible Benefits of PMU based Smart Transmission Grid Availability of PMUs and PDCs at strategic locations in the grid, robust fibre optic communication network and implementation of enabling applications will facilitate:- (cid:2) situational awareness of grid events and dynamic state of the grid in terms of angular¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 825 stability and voltage stability, (cid:2) optimization towards transmission corridor capability. (cid:2) control and regulation of power flow to maintain grid parameters, (cid:2) load shedding and other load control techniques such as demand response mechanisms to manage a power system (cid:2) deployment of remedial action schemes(RAS) and system integrated protection schemes(SIPS), (cid:2) identifying corrective actions to be taken in the event of severe contingency to prevent grid disturbances, (cid:2) monitoring of Inter-area oscillations, (cid:2) adaptive islanding, (cid:2) network model validation, (cid:2) CT/CVT calibration, etc **********826 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] CHAPTER - 6 XI PLAN PROGRESS AND PROGRAMME 6.1 INTRODUCTION 6.1.1 At the end of X Five-Year Plan, corresponding to the total installed generation capacity of 132 GW as on 31st March 2007 and peak demand of 101 GW, the transmission system in the country at 765/HVDC/400/230/220kV stood at 198 thousand circuit kilometres (Tckm) of transmission lines and 257 GVA of substation capacity. 6.1.2 Considering the shortages (13.8% in peaking and 9.6% in energy) as at the end of 10th plan and to meet the demand as forecasted by the 17th EPS, the generation capacity addition requirement for the XI Plan was assessed to be 78.7 GW. However, taking into account the resource constraints and factoring that the demand growths was likely to be less than the 17th EPS projections, the capacity addition programme was reviewed and accordingly 62.4 GW comprising 8.2 GW of hydro, 50.8 GW of thermal and 3.4 GW of nuclear was targeted for the XI plan. Based on the list of generation projects corresponding to this programme of 62.4 GW, transmission requirements at 132 kV level and above including the power evacuation system as well as network strengthening were identified. This transmission programme became the basis for taking up detailed planning exercise and finalizing of their transmission development programme by the Central Transmission Utility and the State Transmission Utilities corresponding to the actual pace of 11th Plan development happening in generation and the actual area-wise load growths. 6.1.3 The actual generation capacity addition during 11th Plan has been at variance with respect to the 62.4 GW plan. Accordingly, the actual 11th Plan transmission programme has also been at variance. Apart from changes in associated transmission system corresponding to deferred /slipped /changed generation, also necessitated review of transmission needs. Accordingly, the transmission programme taken up for execution was revised as per the actual needs matching with generation projects. A few of the transmission works are delayed/held up because of Right-of-Way(RoW) issues, non-availability/delay in getting Forest Clearance and delay in land acquisition for sub- stations. 6.2 SUMMARY OF XI PLAN TRANSMISSION PROGRAMME The following table gives the transmission system in the country as achieved at the end of VIII, IX and X Plan periods: Unit At the end of At the end of At the end of VIII Plan ie IX Plan ie X Plan ie March 1997 March 2002 March 2007 TRANSMISSION LINES VIII Plan IX Plan X Plan HVDC +/- 500 kV ckm 1634 3138 5872 765 kV ckm 0 971 2184 400 kV ckm 36142 49378 75722 230/220 kV ckm 79600 96993 114629 HVDC 200kV Monopole ckm 0 162 162 Total Transmission Line ckm 117376 150642 198569 SUBSTATIONS – AC VIII Plan IX Plan X Plan 765 kV MVA 0 0 0 400 kV MVA 40865 60380 92942 230/220 kV MVA 84177 116363 156497 Total- AC Substation MVA 125042 176743 249439 HVDC TERMINALS VIII Plan IX Plan X Plan HVDC Bipole+Monopole MW 1500 3200 5200 HVDC BTB MW 1500 2000 3000 Total- MW 3000 5200 8200 HVDC Terminal Capacity¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 827 Summary of progress during 11th Plan: Transmission System Unit At the end of Addition At the end of XI Type / Voltage Class X Plan (Mar. during XI Plan Plan i.e. Mar 2012 2007) # TRANSMISSION LINES (a) HVDC ± 500kV Bipole ckm 5872 3560 9432 (b) 765 kV ckm 2184 3546 5250 (c) 400 kV ckm 75722 37645 106819 (d) 230/220kV ckm 114629 25175 135980 (e)HVDC 200kV Monopole ckm 162 -162* 0 Total–Transmission Lines ckm 198569 69926 257481 SUBSTATIONS (a) 765 kV MVA 0 25000 25000 (b) 400 kV MVA 92942 58085 151027 (c) 230/220 kV MVA 156497 67277 223774 Total – Substations MVA 249439 150362 399801 HVDC (a) Bi-pole link capacity MW 5000 1750 6750 (b) Back-to back capacity MW 3000 0 3000 (c) HVDC 220 kV Mono-pole MW 200 -200* 0 Total of (a), (b) & (c) MW 8200 1750 9750 *Barsur –Lower Sileru monopole not in operation. # Up to 10th Plan, the ckm figures show the total stringing carried out. From 11th Plan onwards, the policy has changed to reckon only the lines that have been commissioned or have become ready for commissioning. Accordingly, the addition during 11th Plan has been adjusted with 10852 ckm. (765kV – 480 ckm, 400kV – 6548 ckm and 220kV – 3824 ckm). 6.3 DEVELOPMENT OF HVDC SYSTEMS DURING XI PLAN A summary of development of HVDC systems in India during the XI Plan period is given below: HVDC Transmission Systems At the Addition At end of end of X during XI XI Plan Plan Plan i.e. 3/2012 HVDC Bipole Line Chandrapur-Padghe ± MSEB ckm 1504 1504 500kV Rihand-Dadri ± PGCIL ckm 1634 1634 500kV Talcher-Kolar ± PGCIL ckm 2734 2734 500kV Balia-Bhiwadi(2500MW) ± PGCIL ckm 1580 1580 500kV Mundra-Mohindergarh ± Adani ckm 1980 1980 500kV TOTAL 5872 3560 9432 HVDC Bi-pole Transmission Capacity828 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Chandrapur-Padghe bipole MSEB MW 1500 1500 Rihand-Dadri bipole PGCIL MW 1500 1500 Talcher-Kolar bipole PGCIL MW 2000 500 2500 Balia-Bhiwadi bipole PGCIL MW 1250 1250 Mundra-Mohindergarh bipole Adani MW TOTAL MW 5000 1750 6750 HVDC Back-to-back Transmission Capacity Vindhachal b-t-b PGCIL MW 500 500 Chandrapur b-t-b PGCIL MW 1000 1000 Gazuwaka b-t-b PGCIL MW 1000 1000 Sasaram b-t-b PGCIL MW 500 500 TOTAL MW 3000 0 3000 HVDC Monopole Line Barsur-Lower Sileru 200kV CSEB/ ckm 162 162* APTRANSCO TOTAL ckm 162 -162* 0 HVDC Mono-pole Transmission Capacity Barsur-Lower Sileru M-pole CSEB/ MW 200 200* APTRANSCO TOTAL 200 -200* 0 Grand Total ckm 6034 3560 9432 MW 8200 1750 9750 *Barsur –Lower Sileru monopole not in operation. 6.4 DEVELOPMENT OF 765KV SYSTEMS DURING XI PLAN Up to 10th plan all 765 kV systems in the country were operated at 400kV. Sipat to Seoni was the first system that was operated at 765kV in Sept 2007. This set a new milestone in development of transmission system in the country. A summary of development of 765kV transmission system in India during the XI Plan period is given below: 765kV Transmission Systems At the end Addition at end of XI of X Plan during XI Plan i.e. Plan 3/2012 765kV Transmission Lines Anpara-Unnao S/C UPPCL ckm 409 409 Kishenpur-Moga L-1(W) S/C PGCIL ckm 275 275 Kishenpur-Moga L-2(E) S/C PGCIL ckm 287 287 Tehri-Meerut Line-1 S/C PGCIL ckm 186 186 Tehri-Meerut Line-2 S/C PGCIL ckm 184 184 Agra-Gwalior Line-1 S/C PGCIL ckm 128 128 Gwalior-Bina Line-1 S/C GCIL ckm 235 235 Gaya-Balia S/C PGCIL ckm 228 228 Balia-Lucknow S/C PGCIL ckm 320 320 Sipat-Seoni Line-1 S/C PGCIL ckm 351 351 Sipat-Seoni Line-2 S/C PGCIL ckm 354 354 Seoni – Bina S/C PGCIL ckm 293 293 (to be initially op. at 400KV) Seoni-Wardha line-1 S/C PGCIL ckm 269 269¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 829 (to be initially op. at 400KV) Seoni-Wardha line-2 S/C PGCIL ckm 261 261 (to be initially op. at 400KV) Gwalior-Bina Line-2 S/C ckm 233 233 Agra-Gwalior Line-2 S/C PGCIL ckm 128 128 (to be initially op. at 400KV) LILO of Tehri –Meerut D/C line at Tehri S/C PGCIL ckm 21 21 Pooling Point (to be charged at 400kV) LILO of Sipat - Seoni (2nd Ckt) at WR S/C PGCIL ckm 16 16 Pooling station Near Sipat Sasaram- Fatehpur(Line-1) S/C PGCIL ckm 337 337 Satna-Bina line-1 S/C PGCIL ckm 274 274 Bina- Indore S/C PGCIL ckm 311 311 Gaya- Sasaram S/C PGCIL ckm 148 148 Shifting of Anpara-B -Unnao point from S/C UPPCL ckm 1 1 Anpara- B to Anpara-C Shifting of Anpara-B -Unnao S/C UPPCL ckm 1 1 termaination point at Unnao TOTAL ckm 1704 3546 5250 765kV Sub-stations Seoni Sub Station PGCIL MVA 1500 1500 Seoni New PGCIL MVA 1500 1500 Seoni Extn PGCIL MVA 1500 1500 Fatehpur PGCIL MVA 3000 3000 Gaya PGCIL MVA 3000 3000 WR Pooling Station near Sipat PGCIL MVA 3000 3000 Balia PGCIL MVA 3000 3000 Lucknow PGCIL MVA 3000 3000 Wardha PGCIL MVA 4500 3000 Unnao UPPTCL MVA 1000 1000 TOTAL MVA 0 25000 25000 6.5 PROGRESS AND PROGRAMME DURING XI PLAN In respect of 400kV and 220kV transmission system, the actual achievements during the first four years of the 11th Plan i.e. 2007-08, 2008-09, 2009-10, 2010-11 and 2011-12, are detailed at Annex- 6.1, Annex-6.2, Annex-6.3, Annex-6.4 and Annex-6.5 respectively. These include both ISTS and Intra-STS transmission systems. The summary of 11th plan achievements is given below: 6.5.1 Transmission System Addition during 2007-08 During 2007-08 12,440 Ckm of transmission lines (220kV and above) and 24,423 MVA of transformation capacity was commissioned. It may be mentioned that RAPP-Kankroli D/C line was completed ahead of the commissioning of RAPP Extn. Project (2 x 220 MW) by making special efforts, but the generation from the project could not be achieved due to the non-availability of fuel. The another achievement was the commissioning of 765 kV S/C Sipat-Seoni line in Sept.,07 before the commissioning schedule of 500 MW unit#5 of Sipat project in March,08. Transmission lines and sub-station at 765kV, 400 kV and 220 kV completed during the year 2007-08 are given at Annex 6.1. 6.5.2 Transmission System Addition during 2008-09 During 2008-09 around 9913 Ckm of transmission Lines (220kV and above) and 18,680 MVA Transformation capacity was commissioned. 765 kV Sipat-Seoni Line II, S/C , 354 Ckm was commissioned during April 2008 to evacuate power from Sipat STPP-I Generating Station. 765 kV Agra-Gwalior 2nd S/C (operated at 400kV), 128 Ckm. was commissioned during March 2009 to evacuate power from Kahalgaon STPS-II. 765 kV Seoni-Wardha line, S/C, 269 Ckm. was commissioned during March 2009 to evacuate power from Sipat STPP-I. Transmission lines and sub-station at 765kV, 400 kV and 220 kV completed during the year 2008-09 are given at Annex 6.2830 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 6.5.3 Transmission System Addition during 2009-10 During 2009-10 around 11,790 Ckm of transmission lines (220kV and above) and 21,315 MVA and transformation Capacity was commissioned. During this period 765 kV (operated at 400kV) S/C line from Bina to Gwalior (233 Ckm) was commissioned during Feb. 2010 for Western Regional Transmission system Strengthening and 765 kV Seoni to Bina S/C line (operated at 400kV) was also commissioned in March 2010 which is associated with Barh Generating Station and has been completed before the commissioning of the Barh Generating Station. Transmission lines and sub- station at 765kV, 400 kV and 220 kV completed during the year 2009-10 are given at Annex 6.3. 6.5.4 Transmission System Addition during 2010-11 During 2010-11, around 15,367 Ckm of transmission lines (220kV and above) and 31,657 MVA of Transformation Capacity was achieved. Transmission lines and sub-station at 765kV, 400 kV and 220 kV completed during the year 2010-11 are given at Annex 6.4. 6.5.5 Transmission System Addition during 2011-12 During 2011-12, upto March 2012, around 20434 Ckm of transmission lines (220kV and above) and 54287 MVA of Transformation Capacity was achieved. Transmission lines and sub-station at 765kV, 400 kV and 220 kV completed during this period of 11th plan, are given at Annex-6.5. 6.6 DEVELOPMENT OF INTER-REGIONAL TRANSMISSION CAPACITY DURING THE XI PLAN 6.6.1 Progress and achievement at the end of 11th Plan At the end of the 10th Plan, the inter-regional transmission capacity at 132kV and above was 14050 MW. During the period of XI Plan, (April 2007 to March 2012), 13900 MW of inter-regional transmission capacity has been added, taking the total inter-regional transmission capacity (at voltage level 132kV and above) to 27750 MW as on 31-03-2012. (This includes (i) 2100 MW Gaya- Balia 765kV S/C line which has been commissioned with contingency arrangement at 400kV and (ii) 2100 MW Sasaram–Fatehpur 765kV S/c line which has been commissioned at 765kV level as Gaya –Fetehpur line. It excludes 200MW of Bursur-Lower Sileru HVDC Monopole which is not in operation.) Details of the inter-regional capacity up to the end of 11th plan are given below: (Transmission capacity in MW) Details of Inter-Regional Transmission – Existing at the At the end Addition At the end of 11th Plan of 10th Plan during end of 11th 11th Plan Plan ER – SR : Gazuwaka HVDC back to back 1000 1000 Balimela-Upper Sileru 220kV S/C 130 130 Talcher-Kolar HVDC Bipole 2000 2000 Upgradation of Talcher–Kolar HVDC bipole 500 500 ER-SR total 3130 500 3630 ER –NR : Muzaffarpur - Gorakhpur 400kV D/C 2000 2000 (Quad Moose) with TCSC Dehri-Sahupuri 220kV S/C 130 130 Patna-Balia 400kV D/C quad 800 800 1600 Biharshariff-Balia 400kV D/C quad 1600 1600 Barh-Balia 400kV D/C quad # 1600 1600 Sasaram–Fatehpur 765kV S/C line-1 ## 2100 2100 Gaya–Balia 765kV S/C * 2100 2100 Sasaram: 500 500 1000 (i) HVDC back to back (ii) Bypassing of HVDC back-to- back to establish Sasaram- Allahabad/Varanasi 400kV D/C line ER-NR total 3430 8700 12130¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 831 ER – WR : Rourkela-Raipur 400kV D/C 1000 1000 TCSC on Rourkela-Raipur 400kV D/C 400 400 Budhipara-Korba220kV D/C+S/C 390 390 Ranchi-Sipat 400kV D/C (40% SC) 1200 1200 Ranchi-Rourkela-Raipur 400kV D/C with fixed series 1400 1400 capacitor, TCSC in parallel line Ranchi – WR (Sipat) Pooling Point 765kV S/C $$ - ER-WR total 1790 2600 4390 ER - NER : Birpara-Salakati 220kV D/C 260 260 Malda-Bongaigaon 400kV D/C 1000 1000 Bongaigaon-Siliguri 400kV D/C Quad ** $$ - ER-NER total 1260 1260 NR – WR : Vindhychal HVDC back to back 500 500 Auria-Malanpur 220kV D/C 260 260 Kota-Ujjain 220kV D/C 260 260 Agra-Gwalior 765kV S/C line-1 400kV op. 1100 1100 Agra-Gwalior 765kV S/C line-2 400kV op. 1100 1100 Kankroli-Zerda 400kV D/C 1000 1000 NR-WR total 2120 2100 4220 WR-SR : Chandrapur HVDC back to back 1000 1000 Barsur–L.Sileru 200kV HVDC mono pole @ 200 (-200) 0 Kolhapur-Belgaum 220kV D/C 260 260 Ponda – Nagajhari 220kV D/C 260 260 WR-SR total 1720 1520 TOTAL ALL INDIA (200kV & above), in MW 13450 13900 27150 132kV/110kV Inter-Regional links $ 600 0 600 4xD/C + 4XS/C = 12 ckts TOTAL ALL INDIA 14050 13900 27750 (110/132kV & above), in MW Note: @ - 200 MW HVDC Monopole is currently not in operation. $ - 132/110kV lines are operated in radial mode from time to time. *- Gaya- Balia 765kV S/C line has been commissioned with contingency arrangement at 400kV. ** - Under Private Sector # - Barh-Balia 400kV D/C of 1600 MW has been completed, but is yet to be commissioned. ## - Sasaram–Fatehpur line has been commissioned at 765kV level as Gaya –Fatehpur line. $$ - slipped to early 12th plan.832 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 6.6.2 Planned v/s Achieved I-R capacity in 11th Plan The transmission capacity of Inter-Regional links planned, as per mid-term appraisal (MTA), to be achieved by end of 11th Plan is 32650 MW. The Narendra – Kolhapur 400kV D/C line with HVDC back-to-back terminal of 1000 MW capacity at Kolhapur was reviewed and has been planned as 765 kV link between Narendra (Karnataka-SR) and Kolhapur (Maharashtra-WR). This line would be D/C line and would be initially operated at 400 kV. The line now is planned to be completed in 12th Plan. So, out the remaining 31650 MW capacity, 27950 MW was commissioned in the 11th plan. Gaya – Balia 765kV S/C line line was commissioned with contingency arrangement at 400kV and Sasaram– Fatehpur line has been commissioned at 765kV level as Gaya –Fatehpur line. Status of the remaining 3700 MW capacity links is given in the following table: Sl. Inter- I-R Implementing Scheme under which covered Likely date No. regional capacity Agency of link MW completion 1. Ranchi - 2100 PGCIL As a part of Common scheme for 765kV August 2012 WR pooling stations and network for NR Pooling (Common for Sasan UMPP+ NKP+ Station Maithon/ 765kV S/c Koderma/Mejia/Bokaro/Raghunathpur/ line Durgapur + Import by NR from ER and from NER/SR/WR via ER) and Common scheme for network for WR (Common for NKP+Maithon/Koderma/ Mejia/Bokaro + Raghunathpur/ Durgapur + Import by WR from ER and from NER/SR/WR via ER) 2. Bongaigaon 1600 M/s Sterlite East Transmission Scheme for enabling import March 2013. – Siliguri North of NER/ER surplus by NR (LOI was 400 kV D/C Interconnection placed on quad line Company 7/1/2010 ). Limited Total 3700 6.7 CHALLENGES IN IMPLEMENTATION OF XI PLAN 6.7.1 Challenges Transmission projects are planned along with the upcoming generation projects and any delay/mismatch in commissioning of associated evacuation lines may result in bottling up of power. For some of the transmission works, implementing agencies face challenges in completion of the task. Main challenges are: delay in forest clearance, right of way problems and challenges in acquiring land for substations. Details of transmission line projects (220kV and above) under execution where major forest clearance problems were encountered by implementing agencies (as observed during the XI Plan) are given at Annex - 6.6. 6.7.2 Forest Clearance Forest Clearance is a mandatory requirement for the portion of the line traversing through the forest. While finalizing the route alignment emphasis is on avoidance of forest, National Parks, Wildlife Sanctuary etc., however, it is not possible to avoid such areas completely. Getting Forest Clearance takes considerable time due to lengthy process and involvement of different levels. The Project Authorities are facing problems in getting the consent of Gram Sabhas which has been¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 833 made compulsory under Forest Act 2006. Even the State Governments take lot of time in forwarding the proposal to MOEF for further clearances. 6.7.3 Right of Way (RoW) With increase in transmission voltage, the requirement of land for tower footing and RoW has increased substantially. Despite adoption of latest technological solutions to optimize the RoW requirements, difficulties in getting RoW results in delay in implementation of transmission projects. Norms for evaluation and fixing of compensation for RoW vary from state to state. 6.7.4 Land for Substations: The land for substations is normally government land or private land acquired through Land Acquisition Act 1984. While doing town planning for new suburban area and industrial centers, provision for laying of substation and transmission line should be kept in mind. To reduce the requirement of land for constructing substation use of Gas Insulated Substations (GIS) which requires about 30 % land compared to conventional substation is being increasingly adopted in metro, hilly and other urban areas. 6.8 DEVELOPMENT OF REGIONAL GRIDS DURING THE XI PLAN Following are on-going transmission schemes that have been completed during the 11th plan or works on which has been initiated in the 11th Plan. The transmission system under various schemes associated with generation projects and ISTS system strengthening schemes are given in various Tables in Annex- 6.7. 6.8.1 Northern Region System Strengthening Schemes in Northern Region System strengthening scheme Transmission System in Table no. NRSSS-XIII NR-IS-01/Ch.-6 (scheme under construction) NRSSS-XIV NR-IS-02/Ch.-6 NRSSS - XV NR-IS-03/Ch.-6 (scheme under construction) NRSSS - XVI NR-IS-04/Ch.-6 (scheme under construction) NRSSS - XVII NR-IS-05/Ch.-6 NRSSS - XVIII NR-IS-06/Ch.-6 (scheme under construction) ATS for Generation projects located in Northern Region Generation Project located in IC SECTOR Transmission System in Table no. State (MW) Himachal Pradesh: Chamera III HEP 231 Central NR-HP-01/ Ch.-6 (Transmission system under (slipped to 12th Plan) construction) Parbati - III HEP 520 Central NR-HP-02/Ch.-6 (Transmission system under (slipped to 12th Plan) construction) Karcham Wangtoo HEP 1000 IPP NR-HP-03/Ch.-6 (Transmission system under construction)834 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Budhil HEP 70 IPP NR-HP-04/Ch.-6 (slipped to 12th Plan) Malana II HEP 100 IPP NR-HP-05/Ch.-6 Jammu & Kashmir: Uri - II HEP 240 Central NR-JK-01/Ch.-6 (Transmission system under (slipped to 12th Plan) construction) Chutak 44 Central NR-JK-02/Ch.-6 (slipped to 12th Plan) Nimoo Bazgo 45 Central NR-JK-03/Ch.-6 (slipped to 12th Plan) Uttrakhand: Koteshwar (U1- U4) 400 Central NR-UK-01/Ch.-6 Delhi: Pragati CCGT Ph-III (PPCL) (GT1, 750 State NR-DL-01/Ch.-6 GT2,GT3) (slipped to 12th Plan) Rithala CCPP (NDPL) 108 IPP NR-DL-02/Ch.-6 Haryana: Jhajjar-I (Indira Gandhi) TPS 1000 Central NR-HR-01/Ch.-6 (U-1, 2) Jhajjar(Mahatma Gandhi) TPS 1320 IPP NR-HR-02/Ch.-6 Rajasthan: Jallipa Kapurdi TPP (U-1 -4) (Raj 540 IPP NR-RJ-01/Ch.-6 West Power) Uttar Pradesh: Anpara ' C' (LANCO ANPARA 1200 IPP NR-UP-01/Ch.-6 PPL U-1,2 Harduaganj TPS ( U-8) 250 State NR-UP-02/Ch.-6 Parichha TPS Extn. 500 State NR-UP-03/Ch.-6 Rosa St II ( U-3 & 4) 600 Private NR-UP-04/Ch.-6 (Transmission system under construction) 6.8.2 Western Region System Strengthening Schemes in Western Region System strengthening scheme Transmission System in Table no. Western Region Strengthening Scheme WR-IS-01/Ch.-6 - II Western Region Strengthening Scheme WR-IS-02/Ch.-6 - X Western Region Strengthening Scheme WR-IS-03/Ch.-6 - XI¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 835 ATS for Generation projects located in Western Region Generation Project located in IC SECTOR Transmission System in Table no. State (MW) Gujarat: Hazira TPP (GSECL) 351 State WR-GJ-01/Ch.-6 (Transmission system under construction) Mundra TPP Ph.II (Adani Power) 1320 IPP WR-GJ-02/Ch.-6 (Transmission system under construction) Mundra TPP Ph.III 1980 IPP WR-GJ-03/Ch.-6 Surat Lignite Ext 250 IPP WR-GJ-04/Ch.-6 Essar -Salaya Power U-1 600 IPP WR-GJ-05/Ch.-6 Maharashtra: Bhusaval TPP (MSPGCL) 1000 State WR-MH-01/Ch.-6 Khaperkheda TPS (MSPGCL) 500 State WR-MH-02/Ch.-6 (Transmission system under construction) JSW Energy( Ratanagiri Ltd) 1200 IPP WR-MH-03/Ch.-6 Mihan TPP (Abhijeet Energy) 200 IPP WR-MH-04/Ch.-6 Madhya Pradesh: Maheshwar HEP 400 IPP WR-MP-01/Ch.-6 (Transmission system under construction) (slipped to 12th Plan) Chhatisgarh: Sipat-I 1980 Central WR-CG-01/Ch.-06 S V Power TPP 63 IPP WR-CG-02/Ch.-06 Kasaipalli TPP U-1 135 IPP WR-CG-03/Ch.-06 6.8.3 Southern Region System Strengthening Schemes in Southern Region System strengthening scheme Transmission System in Table no. SRSSS -IX SR-IS-01/Ch.-6 SRSSS -X SR-IS-02/Ch.-6 SRSSS -XI SR-IS-03/Ch.-6836 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ATS for Generation projects located in Southern Region Generation Project located in State IC SECTOR Transmission System in Table no. (MW) Andhra Pradesh: Simhadri TPS St- II (NTPC) 1 000 Central SR-AP-01/Ch.-6 Nagarjuna Sagar TR HEP(2x25 MW) 50 State SR-AP-02/Ch.-6 (slipped to 12th Plan) (Transmission system under construction) Priyadarshani-Jurala HEP(6x39 MW) 234 State SR-AP-03/Ch.-6 Kakatiya (Bhoopalapally ) TPS U-1 500 State SR-AP-04/Ch.-6 Kothagudam TPS ST-VI 500 State SR-AP-05/Ch.-6 Karnataka: Udupi TPS (UPCL) 1200 IPP SR-KA-01/Ch.-6 (Transmission system under construction) Torangallu U 1,2 600 IPP SR-KA-02/Ch.-6 Bellary TPP U-1,2 1000 State SR-KA-03/Ch.-6 Kaiga APP U-3,4 500 Central SR-KA-04/Ch.-6 (Transmission system under construction) Tamil Nadu: Vallur TPS JV(NTPC -TNEB JV)U-1 500 Central SR-TN-01/Ch.-6 (Transmission system under construction) Neyveli TPS II U-1(NLC) 250 Central SR-TN-02/Ch.-6 Kudankulam Atomic St-I 2000 Central SR-TN-03/Ch.-6 North Chennai TPS. 1200 State SR-TN-04/Ch.-6 (Transmission system under (slipped to 12th Plan) construction) Mettur TPS Stage III 600 State SR-TN-06/Ch.-6 (slipped to 12th Plan) 6.8.4 Eastern Region System Strengthening Schemes in Eastern Region System strengthening scheme Transmission System in Table no. ERSSS -IX ER-IS-01/Ch.-6 ERSSS -X ER-IS-02/Ch.-6 ERSSS -XI ER-IS-03/Ch.-6¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 837 ATS for Generation projects located in Eastern Region Generation Project located in State IC SECTOR Transmission System in Table no. (MW) West Bengal: Teesta Low Dam IV (NHPC) 160 Central ER-WB-01/Ch.-6 (Transmission system under (slipped to 12th Plan) construction) Teesta Low Dam III 132 Central ER-WB-02/Ch.-6 (Transmission system under (slipped to 12th Plan) construction) Mejia TPS Ph II(DVC) 1000 Central ER-WB-03/Ch.-6 Durgapur TPS (DVC) 1 0 0 0 Central ER-WB-04/Ch.-6 (Transmission system under construction) Santaldih TPP (WBPDCL) U 5,6 500 State ER-WB-05/Ch.-6 Sagardighi-I & II 600 State ER-WB-06/Ch.-6 Jharkhand: Koderma TPS U-1(DVC) 500 Central ER-JR-01/Ch.-6 Maithon RBTPS (JV of DVC& Tata) 1050 State ER-JR-02/Ch.-6 Orrisa: Sterlite TPP (U-1, 2, 3) 1800 IPP Transmission system in Ch.-7 under tables (Only LILO arrangement completed ER-OR-01, ER-OR-02 ER-OR-03, ER-OR-04 ER-OR-05 Bihar: Barh-I (U-1,2,3) 1980 Central ER-BR-01/Ch.-6 (slipped to 12th Plan) 6.8.5 North-eastern Region ATS for Generation projects located in North-eastern Region Generation Project located in State IC SECTOR Transmission System in Table no. (MW) Meghalaya: Leshka Myntdu - I HEP 84 State NER-MG-01/Ch.-6 6.8.6 Inter-Regional Transmission Schemes: System strengthening scheme Transmission System in Table no. East-West Transmission Corridor IR-SS-01/Ch.-6 Strengthening **********838 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] CHAPTER – 6A ANNEX-XI PLAN PROGRESS AND PROGRAMME Annex-6.1 TRANSMISSION SYSTEM ADDITION DURING 2007-08 Transmission lines completed during 2007- 08 Sl. Name of the transmission lines No. Executing Agency Line Month of No. of length Completion ckts (CKM) I. 765 KV LINES 1 Sipat - Seoni Line1 S/C POWERGRID 351 Sep-07 TOTAL CKM OF FULLY COMPLETED 765 kV LINES (All India) DURING THE YEAR 351 Sl. Name of the transmission lines No. Executing Agency Line Month of No. of length Completion ckts (CKM) II. 400 KV LINES(CS) 1 Balia - Lucknow D/C POWERGRID 632 Apr-07 2 Maithon - Ranchi D/C POWERGRID 400 May-07 3 Line from Singrauli to a point 2.3 Km near existing D/C POWERGRID 6 May-07 Vindhyachal - Kanpur Line. 4 Gooty - Raichur D/C POWERGRID 294 May-07 5 Vindhyachal - Korba S/C POWERGRID 291 Jun-07 6 Lucknow - Bareilly D/C POWERGRID 511 Jul-07 7 LILO of Bareilly - Mandaula at Bareilly 2xD/C POWERGRID 37 Jul-07 8 Satna - Bina Ckt I & II S/C on POWERGRID 545 Aug-07 D/C 9 LILO of Lucknow - Moradabad at Bareilly D/C POWERGRID 22 Aug-07 10 LILO of Dadri - Ballabhgarh at Delhi D/C POWERGRID 60 Sep-07 11 LILO of S/C Bhilai - Satpura at Seoni D/C POWERGRID 4 Sep-07 12 Biharshariff - Balia (Quad) Ckt-I S/C on POWERGRID 484 Jan-08 D/C 13 LILO of Sultanpur - Lucknow at Lucknow D/C POWERGRID 42 Dec-07 14 LILO one ckt of Hissar - Moga at Fatehabad D/C POWERGRID 59 Dec-07 15 Nagda - Dehgam D/C POWERGRID 664 Dec-07 16 LILO of Rourkela - Raipur at Raigarh D/C POWERGRID 37 Dec-07 17 LILO of Korba - Raipur, S/C at Bhatapara D/C POWERGRID 5 Dec-07 18 Bina - Nagda D/C POWERGRID 662 Dec-07 19 Narendra - Davangere D/C POWERGRID 310 Jan-08 20 Ludhiana - Jallandhar S/C POWERGRID 85 Mar-08 21 Seoni - Khandwa (Quad) D/C POWERGRID 703 Mar-08 22 Khandwa - Rajgarh ckt II D/C POWERGRID 220 Mar-08 23 LILO of Both Ckt of Gazuwaka -Vijayawada 400 kV D/C POWERGRID 156 Mar-08 D/C at Vemagiri S/S. 24 Malerkotla - Ludhiana S/C POWERGRID 36 Mar-08 25 LILO of both ckt of S. Sarovar - Nagda at Rajgarh D/C POWERGRID 16 Mar-08 26 Teesta V - Siliguri ckt I S/C POWERGRID 114 Mar-08 27 LILO of 1st ckt of Maduri (PG) -Trivendrum (PG) at D/C POWERGRID 106 Mar-08 Tirunelveli 28 RAPP 5&6 - Kankroli D/C POWERGRID 397 Mar-08 TOTAL 400 kV LINES (CS) 6898 220 KV LINES (Centor Sector) 1 Unchahar - Raibareilly S/C POWERGRID 43 Jul-07¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 839 2 LILO of one ckt of Unchahar-Lucknow at D/C POWERGRID 12 Jul-07 Raibareilly 3 MTPS-Durgapur D/C DVC 84 Aug-07 4 LILO Patratu-Chandil D/C at Ranchi 2xD/C POWERGRID 29 Sep-07 TOTAL 220 kV LINES (CS) 168 Total CS (765 +400+220+132 kV PG only) 7417 Sl. Name of the transmission lines No. Executing Line Month of No. of Agency length Completion ckts (CKM) State Sector 400 KV LINES 1 Purulia Pump Storage-Arambagh D/C West Bengal 418 Apr-07 2 Purulia Pump Storage-Durgapur ckt 1 S/C West Bengal 370 Apr-07 3 Lonikhand-Padghe diversion at Chakan MIDC S/C Maharashtra 4 May-07 4 Dehgam (PGCIL)-Ranchodpura D/C Gujarat 125 Jul-07 5 LILO of Jhanoor- Vapi at Akhakol D/C Gujarat 28 Nov-07 6 LILO of Bhusawal-Koradi Ist Ckt.at Akola D/C Maharashtra 80 Jan-08 TOTAL 400 kV LINES (SS) 1025 220 kV LINES (State Sector) 1 LILO of S P Koil-Tharamani at Siruseri D/C Tamil Nadu 20 Apr-07 2 Tap line of Mamidipally-Chandrayanagutta to D/C Andhra Pradesh 1 Apr-07 Hyderabad Airport 3 245 kV XLPE UG cable Asifnagar-Karwan Andhra Pradesh 3 Apr-07 4 Mada- Barmer D/C Rajasthan 258 Apr-07 5 Satara MIDC-Vankusawade D/C Maharashtra 30 Apr-07 6 Seoni 400 kV(PG)-Seoni(MP) D/C Madhya Pradesh 9 May-07 7 LILO Theur-Jejuri at Hulkarwadi D/C Maharashtra 38 May-07 8 Nasik-Kalwa-III&IV D/C Maharashtra 2 Jun-07 9 Khinvsar-Bhopalgarh S/C Rajasthan 36 Jun-07 10 Birsinghpur-Jabalpur D/C Madhya Pradesh 274 Jun-07 11 LILO Birsinghpur(T)-Birsinghpur(H) 2nd Ckt at D/C Madhya Pradesh 12 Jun-07 Birsinghpur S/S 12 Kanhan-Umred S/C on D/C S/C Maharashtra 50 Jun-07 13 LILO of Birsinghpur(T)-Nowrozabad D/C at Birsinghpur 2xD/C Madhya Pradesh 23 Jul-07 S/S 14 LILO of Nellor-Renigunta at Nellore D/C Andhra Pradesh 20 Jul-07 15 LILO Vijjeswaram-VTPS at Kamavarapukota D/C Andhra Pradesh 46 Jul-07 16 Myvadi Sw.Stn.-Ponnapuram Ckt-I D/C Tamil Nadu 19 Jul-07 17 Hissar(BBMB)-Hissar IA (2nd Ckt) S/C Haryana 1.5 Aug-07 18 LILO of STPS-Durgapur circuit -I at Asansol D/C West Bengal 80 Aug-07 19 Chalakurthy-Kondamallepalli S/C on D/C S/C Andhra Pradesh 43 Aug-07 20 Mamidipalli-Yeddumailaram 2nd ckt stringing S/C Andhra Pradesh 63 Aug-07 21 Neelamangala-DB Pura D/C Karnataka 33 Aug-07 22 LILO of Sharawati- Hubli at Sirsi Sw. Stn. D/C Karnataka 13 Aug-07 23 LILO Dausa-Bharatpur at Mandawar D/C Rajasthan 16 Sep-07 24 Barsinghsar-Nagaur S/C Rajasthan 104 Sep-07 25 LILO Ratangarh-Bikaner at Sridungargarh D/C Rajasthan 5 Sep-07 26 Sagardighi-Gokarna D/C West Bengal 90 Sep-07 27 JTPS-Raigarh Industrial Estate (Panjipatra) D/C Chhattisgarh 40 Sep-07 28 Talapally-Chalakurthy S/C on D/C S/C Andhra Pradesh 26 Sep-07 29 Myvadi Sw.Stn.-Ponnapuram Ckt-II D/C Tamil Nadu 19 Sep-07 30 LILO Rajkot-Morbi at Hadala D/C Gujarat 1 Sep-07 31 Rajkot-Morbi D/C Gujarat 145 Sep-07840 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 32 LILO 1 ckt of Indore-Dewas at Indore (East) D/C Madhya Pradesh 1 Sep-07 33 Bhatapara (Suhela) – Bemetara D / C Chhattisgarh 89 Oct-07 34 Bhatapara (Suhela) – Mahasamund D/C Chhattisgarh 124 Oct-07 35 Mejia-Durgapur S/C West Bengal 64 Oct-07 36 Yamunanagar TPP-Jorian (Yamunanagar) D/C Haryana 22 Oct-07 37 Yamunanagar TPP – Salempur (connected to Nissing D/C Haryana 86 Oct-07 bypassing Salempur) 38 LILO of Alagar koil(North Madurai)- Karaikudi at D/C Tamil Nadu 193 Oct-07 Valuthur S/S 39 LILO Shimoga-Mysore at Yachanyalli D/C Karnataka 6 Nov-07 40 Maharani Bagh-Lodhi Road Ckt-I S/C on Delhi 1.2 Dec-07 D/C 41 Kailash Chandrapur - Padmanavpur D/C Orissa 68 Dec-07 42 Padmanavpur - Balasore ckt-1 D/C Orissa 22 Dec-07 43 LILO of Apta-Chinchwad at Urse D/C Maharashtra 22 Dec-07 44 G. NOIDA-NOIDA (P) ckt-1 S/C on Uttar Pradesh 27 Dec-07 D/C 45 Korba (E) DSPM-Bhatapara (Suhela) D/C Chhattisgarh 284 Dec-07 46 LILO of Dhule-Dondaicha at Amalner D/C Maharashtra 61 Dec-07 47 Talandage-Kagal Five Star MIDC D/C on Maharashtra 4 Dec-07 M/C 48 LILO Ramagundam-Warangal at Pulakurthy D/C Andhra Pradesh 21 Dec-07 49 2nd LILO Nellore-Renigunda at Nellore (400 kV S/S) D/C Andhra Pradesh 20 Dec-07 50 LILO Kayathar-Sankaneri at Tiruneveli (400 kV S/S) D/C Tamil Nadu 44 Dec-07 51 LILO of Korba – Amarkantak at Pendra (Kotmikala) D/C Chhattisgarh 23 Dec-07 52 LILO of Korba (E) DSPM– Bhatapara (Suhela) 2nd Ckt. D/C Chhattisgarh 2 Dec-07 at Champa (Banari) 53 Maharani Bagh-Lodhi Road Ckt-II S/C on Delhi 1.2 Jan-08 D/C 54 Rajendra Steel-Siltara 2nd S/C S/C Chhattisgarh 2 Jan-08 55 Dhanki-Adalsar D/C Gujarat 18 Jan-08 56 LILO of Malharpeth-Wankuswade for Satara MIDC S/S D/C Maharashtra 60 Jan-08 57 LILO of Somanhalli- T K Halli at Kanakapura D/C Karnataka 6 Jan-08 58 LILO of Kozhikode - Idukki line at Malaparamba D/C Kerala 2 Jan-08 59 LILO Jindal-Washala at Ghatghar (by modification D/C Maharashtra 0 Jan-08 only) 60 PGCIL S/S-Nalasopara S/C Maharashtra 4 Jan-08 61 Adalsar-Bala D/C Gujarat 22 Jan-08 62 LILO of Nanikhakhar-Shivlakha D/C at Varsana D/C Gujarat 7 Jan-08 63 LILO for Duni D/C Rajasthan 4 Feb-08 64 LILO of Khaperkheda-Bhandara 2nd ckt at Kanan D/C Maharashtra 20 Feb-08 65 LILO Paricha-Safai at Bharthana D/C Uttar Pradesh 8 Feb-08 66 Vetloor 400 kV S/S - Jurala D/C Andhra Pradesh 66 Mar-08 67 LILO from Mamidipally- Yeddumallaram at Shadnagar D/C Andhra Pradesh 36 Mar-08 68 Dichpally 400 kV S/S- Dichpally D/C Andhra Pradesh 8 Mar-08 69 Sharavati Generating Station-Dugadimane M/C Karnataka 28 Mar-08 70 Tirunelveli (400 kV)-Veeranam S/C on Tamil Nadu 31 Mar-08 D/C 71 Kodikurichi-Chekkanoorani S/C Tamil Nadu 31 Mar-08 72 Theruvali -Narendrapur-Chandaka D/C Orissa 750 Mar-08 73 IB Thermal-Budhipadar(2nd D/C) D/C Orissa 52 Mar-08 74 LILO of STPS-Arambagh at Bishnupur 2xD/C West Bengal 4 Mar-08 75 LILO of Bhanjnagar-Chandaka at Mendhasal D/C Orissa 12 Mar-08 76 LILO of Bhilai- Bansoor(2nd ckt) at Gurur D/C Chhattisgarh 14 Mar-08 77 Bhauti (PG)-Orai S/C Uttar Pradesh 90 Mar-08 78 LILO of Fatuha-Khagaul at Patna PG D/C Bihar 20 Mar-08¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 841 TOTAL 220 kV LINES (SS) 4001 Total SS (400+220) kV 5026 TOTAL CKM OF FULLY COMPLETED 400 kV LINES (All India) DURING THE YEAR 7923 TOTAL CKM OF FULLY COMPLETED 220 kV LINES (All India) DURING THE YEAR 4169 Sub-stations completed during 2007-08 Sl. Name of the Sub-station Voltage Executing Capacity Month of No. Ratio Agency (MW/MVA) completion (kV/kV) II. 765 kV (Sub-station) 1 Seoni Sub Station ( 7x ( 500-333 )) 765/400 POWERGRID 1500 Sep-07 2 Seoni New (3x500) 765/400 POWERGRID 1500 Mar-08 3 Seoni Extn. (3x500) 765/400 POWERGRID 1500 Mar-08 Sl. Name of the Sub-station Voltage Executing Capacity Month of No. Ratio Agency (MW/MVA) completion (kV/kV) Ill. 400 kV (Sub-station)(CS) 1 Ranchi (ICT-1) 400/220 POWERGRID 315 May-07 2 Gwalior (New) 400/220 POWERGRID 315 May-07 3 Wagoora (3rd ) (3x105) 400/220 POWERGRID 315 Jun-07 4 Moga (Aug) 400/220 POWERGRID 315 Jun-07 5 Cuddapa Extn. 400/220 POWERGRID 315 Aug-07 6 Delhi (GIS) 400/220 POWERGRID 630 Sep-07 7 Gooty Extn. 400/220 POWERGRID 315 Sep-07 8 Kolar Extn. 400/220 POWERGRID 500 Sep-07 9 Gazuwaka Extn, 400/220 POWERGRID 315 Oct-07 10 Ranchi (ICT-II) 400/220 POWERGRID 315 Nov-07 11 Fatehabad (New) ICT-I 400/220 POWERGRID 315 Dec-07 12 Patna 2nd ICT 400/220 POWERGRID 315 Dec-07 13 Raigarh (New) ICT-I 400/220 POWERGRID 315 Dec-07 14 Bhatapara (New) 400/220 POWERGRID 315 Dec-07 15 Munerabad Extn. 400/220 POWERGRID 315 Dec-07 16 Seoni ICT-I 400/220 POWERGRID 315 Jan-08 17 Khammam Extn. 400/220 POWERGRID 315 Jan-08 18 Raigarh (New) ICT-II 400/220 POWERGRID 315 Feb-08 19 Seoni II ICT 400/220 POWERGRID 315 Mar-08 20 Gwalior (New) II ICT 400/220 POWERGRID 315 Mar-08 21 Amritsar (Aug) 400/220 POWERGRID 315 Mar-08 22 Rajgarh (New) 400/220 POWERGRID 315 Mar-08 23 Hiriyur Extn. 400/220 POWERGRID 315 Mar-08 24 Vijayawada Extn. 400/220 POWERGRID 315 Mar-08 25 Fatehabad ICT- II 400/220 POWERGRID 315 Mar-08 Total (Central Sector) 400 8375 220 kV (Sub-station)(CS) 1 Raebareilly ICT-I 220/132 POWERGRID 100 Sep-07 2 Raebareilly ICT-II 220/132 POWERGRID 100 Dec-07 Total (Central Sector) 220 200 Total CS (765 +400+220) kV 13075842 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Sl. Name of the Sub-station Voltage Executing Capacity Month of No. Ratio Agency completion (kV/kV) (MW/MVA) 400kV Substation (SS) 1 Ranchodpura(Vadavi)(2nd) 400/220 Gujarat 315 Jan-08 2 Alamathy 400/230 Tamil Nadu 630 Jan-08 3 Mamidipally 400/220 Andhrapradesh 315 Jan-08 4 Dichpally 400/220 Andhrapradesh 630 Feb-08 TOTAL 400kV Substation (SS) 400/220 1890 220 kV (Sub-station)(SS) 1 Siruseri 230/110 Tamilnadu 200 Apr-07 2 Rania (2nd) 220/132 Haryana 100 May-07 3 Gadchandur 220/33 Maharashtra 25 May-07 7 Kamavarepukota 220/132 Andhra Pradesh 100 Jul-07 8 Ponnapuram 230/110 Tamil Nadu 100 Jul-07 9 Agia 220/132 Assam 50 Jul-07 10 Subramanyapura 2nd ICT (Aug) 220/66 Karnataka 50 Aug-07 11 Devanahalli Int. Air Port 220/66 Karnataka 100 Aug-07 12 Sankaneri 230/110 Tamil Nadu 100 Aug-07 13 Ponnapuram 2nd ICT 230/110 Tamil Nadu 100 Aug-07 14 Mahasamund 220/132 Chhatisgarh 160 Aug-07 15 Indore(E) 220/33 Madhya Pradesh 100 Aug-07 16 Kamba (Bhivandi-II) 220/22 Maharashtra 50 Aug-07 17 Tambati(Aug) 220/22 Maharashtra 25 Aug-07 18 Kondamallepalli 220/132 Andhra Pradesh 100 Aug-07 19 Alwar Aug (100-50) 220/132 Rajasthan 50 Sep-07 20 Dhandarikala Aug 220/66 Punjab 100 Sep-07 21 Baraut (160-100) 220/132 Uttar Pradesh 60 Sep-07 22 Kurkumbh 220/33 Maharashtra 50 Sep-07 23 Bahadurgarh 2nd ICT 220/132 Haryana 100 Sep-07 24 Ghatnandre 3rd ICT 220/33 Maharashtra 100 Sep-07 25 Vita Aug (50-25) 220/33 Maharashtra 25 Sep-07 26 Sirsi 220/66 Karnataka 50 Sep-07 27 Sankaneri Addl 230/110 Tamil Nadu 100 Sep-07 28 Ingur Addl 230/110 Tamil Nadu 100 Sep-07 29 Kodikurichi Addl 230/110 Tamil Nadu 100 Sep-07 30 Temburni 220/33 Maharashtra 25 Oct-07 31 C.R.Patna (Yachanahalli) 220/66 Karnataka 200 Oct-07 32 Kalyandurg 220/132 Andhra Pradesh 100 Oct-07 33 Rewa (Addl) 220/132 Madhya Pradesh 160 Oct-07 34 Agra Cantt. (Aug) 220/33 Uttar Pradesh 23 Oct-07 35 Valuthur 230/110 Tamil Nadu 300 Oct-07 36 Shahjahanpur Aug (160-100) 220/132 Uttar Pradesh 60 Nov-07 37 HSR Layout Aug 2x(150-100) 220/66 Karnataka 100 Nov-07 38 NRS Aug (150-100) 220/66 Karnataka 50 Nov-07 39 Tharamani Addl 230/110 Tamil Nadu 100 Nov-07 40 Daultabad ICT-I 220/66 Haryana 100 Nov-07 41 Zainkote (Aug) 220/132 Jammu & Kashmir 150 Dec-07 42 Burla 220/132 Orissa 200 Dec-07 43 Tarkera (4th) 220/132 Orissa 100 Dec-07 44 Balimela 1st 220/33 Orissa 20 Dec-07 45 Krishna Nagar (2x160) 220/132 West Bengal 320 Dec-07 46 Asansol 220/132 West Bengal 160 Dec-07 47 Firozabad Extn. 220/132 Uttar Pradesh 100 Dec-07 48 Khurja Extn. 220/132 Uttar Pradesh 40 Dec-07 49 Hathras 220/132 Uttar Pradesh 40 Dec-08 50 Gazipur 220/132 Uttar Pradesh 100 Dec-07 51 Mandawar (Dausa) 220/132 Rajasthan 100 Dec-07 52 Khinvsar S/S 1X100 MVA 220/132 Rajasthan 100 Dec-07¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 843 53 Amalner 220/132 Maharashtra 100 Dec-07 54 Talangde (Five Star MIDC) Kagal 220/33 Maharashtra 50 Dec-07 55 Moulali 220/132 Andhra Pradesh 160 Dec-07 56 Shapur Nagar 220/132 Andhra Pradesh 160 Dec-07 57 Hatia 220/132 Jharkhand 300 Jan-08 58 Chandil 3rd Transformer 220/132 Jharkhand 100 Jan-08 59 Urse (1x50) 220/33 Maharashtra 50 Jan-08 60 Amalner (1x100) 220/132 Maharashtra 100 Jan-08 61 Pirangut 220/22 Maharashtra 50 Jan-08 62 Adalsar 220/22 Gujarat 50 Jan-08 63 Eklahare(200-50) 220/132 Maharashtra 150 Jan-08 64 Gobi 230/110 Tamil Nadu 100 Jan-08 65 Siruseri 230/110 Tamil Nadu 100 Jan-08 66 Thatchankurichi 230/110 Tamil Nadu 100 Jan-08 67 Kilpauk(Aug) 50 to 100 230/110 Tamil Nadu 50 Jan-08 68 Vinnamangalam(Aug.)50 to 100 230/110 Tamil Nadu 50 Jan-08 69 Ingur(Aug) 50 to 100 230/110 Tamil Nadu 50 Jan-08 70 Kanakapura 220/66 Karnataka 100 Jan-08 71 Bidadi Add Tr. 220/66 Karnataka 100 Jan-08 72 Malaparamba 220/110 Kerala 100 Jan-08 73 Versana 220/66 Gujarat 100 Jan-08 74 Duni 220/132 Rajasthan 50 Feb-08 75 Udhyog Vihar (Aug) 220/132 Rajasthan 50 Feb-08 76 Handia (Addl.) 220/33 Madhya Pradesh 160 Feb-08 77 Nimrani (Addl) 220/132 Madhya Pradesh 160 Feb-08 78 Jalna (50-25) 220/33 Maharashtra 25 Feb-08 79 SICOM(Chandrapur) 220/33 Maharashtra 50 Feb-08 80 Hinjewade (50-25) 220/22 Maharashtra 25 Feb-08 81 Gokul Aug. (160-100) 220/132 Uttar Pradesh 60 Feb-08 82 C.B. Ganj (160-100) 220/132 Uttar Pradesh 60 Feb-08 83 Tekkali 220/132 Andhra Pradesh 100 Mar-08 84 Shadnagar 220/132 Andhra Pradesh 100 Mar-08 85 Shahapur 220/110 Karnataka 100 Mar-08 86 Kilpauk(Aug) 50 to 100 230/110 Tamil Nadu 50 Mar-08 87 Karimangalam(Addl.) 230/110 Tamil Nadu 100 Mar-08 88 Parvati(1x200+1x50) 220/22 Maharashtra 250 Mar-08 89 Varora 220/33 Maharashtra 25 Mar-08 90 Umred 220/33 Maharashtra 25 Mar-08 91 Colourchem(Thane) 220/22 Maharashtra 50 Mar-08 92 Ranjangaon Aug.(1x50+1x100) 220/22 Maharashtra 150 Mar-08 93 Sarnath Aug.(160-100) 220/132 Uttar Pradesh 60 Mar-08 94 Salempur 220/66 Haryana 100 Mar-08 95 Alephata 220/132 Maharashtra 100 Mar-08 96 Bishnupur 220/132 West Bengal 320 Mar-08 97 Rajpur 220/11 Gujarat 25 Mar-08 98 Sridungargarh 220/132 Rajasthan 100 Mar-08 99 Siwan(new)Gopalgang 220/132 Bihar 200 Mar-08 TOTAL (State Sector) 220 9458 TOTAL 400kV Substation (ALL INDIA) 10265 TOTAL 220kV Substation (ALL INDIA) 9658844 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Annex – 6.2 TRANSMISSION SYSTEM ADDITION DURING 2008-09 Transmission lines commissioned during 2008-09 S Name of the transmission lines No. Executing Line Month of Completion No of Agency length ckts (CKM) I. 765 KV LINES 1 Sipat - Seoni line-II S/C POWERGRID 354 Apr.'08 2 Agra - Gwalior 2nd S/C (initially to be operated at S/C POWERGRID 128 Mar-09 400KV) 3 Seoni - Wardha line (to be operated at 400KV) S/C POWERGRID 269 Mar-09 TOTAL 765 KV LINES (ALL INDIA) 751 S Name of the transmission lines No. Executing Line Month of Completion No of Agency length ckts (CKM) Il. 400 KV LINES(CS) 1 LILO of 2nd ckt of Maduri (PG) -Trivendrum (PG) D/C POWERGRID 107 Mar-08 at Tirunelveli 2 Bareilly - Mordadabad S/C POWERGRID 91 May-08 3 LILO of existing Kolar-Sriperumbadur at D/C POWERGRID 31 May-08 Melakottaiyur S/Stn. 4 Teesta-V - Siliguri (Ckt-II ) S/C POWERGRID 114 May-08 5 Sipat - Raipur D/C POWERGRID 298 Jul-08 6 Kota - Merta D/C POWERGRID 512 Jan-09 7 Ranchi-Sipat line D/C POWERGRID 816 Jan-09 8 RAPP 5&6 - Kota D/C POWERGRID 75 Mar-09 9 LILO of Hissar - Jaipur at Bhiwadi D/C POWERGRID 156 Mar-09 10 LILO of Rishikesh - Muzaffarnagar at Roorkee D/C POWERGRID 3 Mar-09 11 Wardha - Akola D/C POWERGRID 324 Mar-09 12 Pugalur - Madurai D/C POWERGRID 246 Mar-09 13 Zerda - kankroli D/C POWERGRID 470 Mar-09 14 Neyveli TS -II - Pugalur D/C POWERGRID 395 Mar-09 15 Kundankulam (NPC) - Tirunelveli (PG) (Quad Line D/C POWERGRID 145 Mar-09 -I 16 Kundankulam (NPC) - Tirunelveli (PG) (Quad) line D/C POWERGRID 160 Mar-09 -II 17 Tirunelveli (PG) - Udumalpet (PG) D/C POWERGRID 534 Mar-09 TOTAL 400 kV LINES (CS) 4477 220 KV LINES Center Sector 1 Vapi (PG) - Magarwada line D/C& POWERGRID 31 Apr-08 M/C 2 Vapi (PG) - Kharadpada (DNH) D/C POWERGRID 34 Jun-08 3 LILO of 1 ckt. Of Tanakpur-Bareilly at Sitarganj D/C POWERGRID 44 Mar-09 TOTAL 220 kV LINES (CS) 109 Total CS (765 +400+220) 5337¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 845 S Name of the transmission lines No. Executing Line Month of Completion No of Agency length ckts (CKM) 400kV (State Sector) 1 LILO of Korba-Sipat at Amarkantak D/C Chhattisgarh 62 Apr-08 2 JTPS-Raipur D/C D/C Chhattisgarh 516 May-08 3 Ramagundam(NTPC)-Ditchpally S/C Andhra Pradesh 171 May-08 4 LILO of Ramagundam -Ghanapur at Gajwel D/C Andhra Pradesh 21 Aug-08 5 Ratangarh-Merta S/C Rajasthan 181 May-08 6 LILO of RTPS-Guttur at BTPS D/C Karnataka 2 Jun-08 7 LILO of Birsinghpur - Damoh D/C at Damoh D/C Madya Pradesh 26 Aug-08 8 Interconnector of Birsinghpur-Katni-Damoh at D/C Madya Pradesh 1 Aug-08 Birsinghpur 9 Diversion of Birsinghpur-Katni-Damoh at Katni D/C Madya Pradesh 2 Aug-08 10 LILO of Farakka-Subhashgram at Sagardighi D/C West Bengal 13 Aug-08 11 Kishenpur-Baglihar (Ist ckt) S/C Jammu& Kashmir 68 Oct-08 12 NSPCL-Raipur D/C Chhattisgarh 28 Mar-09 13 Chhabra-Dahra (Kota) D/C Rajasthan 261 Mar-09 TOTAL 400 kV LINES (SS) 1352 220 KV LINES(SS) 1 LILO of Pugalur-Checkanoorani at D/C Tamil Nadu 32 Apr-08 Renganathapuram 2 LILO of both ckts of Bhopal-Itarsi at Itarsi 2xD/C Madya Pradesh 2 Apr-08 3 Akhakhol-Kim D/C Gujarat 8 Apr-08 4 NSPCL-Gurur (CSEB) S/C Chhattisgarh 20 Apr-08 5 LILO from Shimoga- Mysore at Huygonahalli (K D/C Karnataka 23 May-08 R Pet) 6 LILO Bhilwara-Kankroli at Kankroli(PG) S/C Rajasthan 9.5 May-08 7 Ponnapuram- Palladam SC on Tamil Nadu 32 Jun-08 DC 8 LILO of 1st Ckt of Itarsi-Bhopal at Mandideep D/C Madya Pradesh 12 Jun-08 9 Pitampur-Raigarh (2nd) Ckt S/C Madya Pradesh 69 Jun-08 10 Nilokheri-Karnal S/C Haryana 19 Jun-08 11 LILO of Gobindgarh-I - Gobindgarh-II at Amloh D/C Punjab 2 Jun-08 Road Gobindgarh 12 LILO one ckt of Lalton- Jagron at Ludhiana (PG) D/C Punjab 4 Jun-08 13 Barn-Kishenpur D/C Jammu& Kashmir 75 Jun-08 14 LILO of S P Koil- Tharamani II at Kalivanthapattu D/C Tamil Nadu 14 Jul-08 400kV S/S 15 Kayathar - Checkkanoorani 400 kV S/S D/C Tamil Nadu 244 Jul-08 16 LILO of Barwaha-Nepanagar (Khandwa) at 2xD/C Madya Pradesh 91 Jul-08 Omkareshwar 17 LILO of Chhabra-Baran-Dahra at Kawai D/C Rajasthan 2 Jul-08 18 Opening of one ckt of Heerapura-Bassi line and S/C Rajasthan 59 Jul-08 connecting Sanganer & Phulera 19 Khasa – Amritsar (at Balachak (PGCIL)) D/C Punjab 44 Jul-08 20 Moga (400 KV)- Jagraon D/C Punjab 1 Jul-08 21 LILO of Sriperumbadur -S P Koil at Oragadom D/C Tamil Nadu 18 Aug-08 S/S 22 LILO of S P Koil- Tharamani at Veerapuram D/C Tamil Nadu 5 Aug-08 23 LILO of both circuits of Pitampur-Raigarh D/C at 2xD/C Madya Pradesh 92 Aug-08 Rajgarh(PG) 24 LILO of SMG- Mysore at Kadavinakote D/C Karnataka 33 Aug-08 25 LILO of Giral -Barmer ckt 1 at RAJ West LTPS D/C Rajasthan 5 Aug-08 26 LILO of Paricha-Safai at Bharthana D/C Uttar Pradesh 5 Aug-08846 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 27 LILO of Birsinghpur-Satna at Amarkantak D/C Madya Pradesh 90 Sep-08 (Chachai) 28 LILO Heerapura-Kukas at VKIA D/C Rajasthan 2 Sep-08 29 LILO of Pugalur -Myvadi at proposed Pugalur D/C Tamil Nadu 15 Oct-08 400kV S/S 30 Alamathy S/S - Manali D/C Tamil Nadu 47 Oct-08 31 Bardoli-Chikali D/C Gujarat 96 Oct-08 32 Hoody - HAL D/C Karnataka 6 Oct-08 33 Bhiwadi(PGCIL)-Neemrana S/C Rajasthan 52 Oct-08 34 LILO Bhiwadi-Neemrana at Khushkhera D/C Rajasthan 8 Oct-08 35 LILO Alwar-Bhiwadi at Khushekhera D/C Rajasthan 5 Oct-08 36 LILO of Ajmer - Phulera at Kishangarh D/C Rajasthan 0.2 Oct-08 37 LILO of Birsinghpur-Rewa for Sidhi D/C Madya Pradesh 118 Nov-08 38 LILO of one Ckt of Anjar - Panadhro at Kukma D/C Gujarat 5 Nov-08 39 LILO one ckt of Shahbad-Pehova at Durala D/C Haryana 6 Nov-08 40 LILO Narwana-Fatehabad & Fatehabad-Sirsa at D/C Haryana 5 Nov-08 Fatehabad (PG) 41 LILO of Narwana-Fatehabad at Bhuna D/C Haryana 16 Nov-08 42 Padmanavpur - Balasore D/C Orissa 44 Nov-08 43 Bhimavaram- Gudivada D/C Andhra Pradesh 121 Nov-08 44 LILO of 1st Ckt Damoh-Tikamgarh at Damoh(400 D/C Madya Pradesh 2 Dec-08 kV) 45 LILO of 2nd Ckt of Damoh - Bina D/C at Sagar D/C Madya Pradesh 10 Dec-08 46 LILO of both Ckt of Ujjain- Kota at Badod D/C Madya Pradesh 15 Dec-08 47 Mundra (Adani) -Nani khakher D/C Gujarat 33 Dec-08 48 Barsinghsar -Khinvsar S/C Rajasthan 98 Dec-08 49 GNDTP-Muktsar (2nd ckt) S/C on Punjab 53 Dec-08 D/C 50 LILO of Mamidipally- Chandrayanagutta ckt-2 at D/C Andhra Pradesh 3 Dec-08 HIAL 51 LILO of 2nd ckt of Malkaram- Minpur at Medchal D/C Andhra Pradesh 1 Dec-08 52 LILO of VTS- Tallapally at Rentachintala D/C Andhra Pradesh 2 Dec-08 53 Gangapur - Valve D/C Maharashtra 13 Dec-08 54 LILO of Neyveli TS-II-Neyveli Zero Unit at D/C Tamil Nadu 22.5 Jan-09 Cuddalore 55 Sriperumbudur 400 kV S/S-Nokia D/C Tamil Nadu 11 Jan-09 56 Khemar- Puttur(Guruvanyankere-Puttur part line) D/C Karnataka 56 Jan-09 57 LILO of Mahalingpur- Kudachi at Athani D/C Karnataka 48 Jan-09 58 LILO of Basavanabagevadi-Indi at Bijapur D/C Karnataka 12 Jan-09 59 LILO of Peenya- Somanahalli at Vrishabhavathi D/C Karnataka 0.5 Jan-09 S/S 60 Loni-Muradnagar(400 kV S/S) D/C Uttar Pradesh 27 Jan-09 61 LILO of Khurja-Muradnagar at Sikandrabad D/C Uttar Pradesh 38 Jan-09 62 LILO of Sarojininagar-Chinhat at Gomtinagar D/C Uttar Pradesh 7 Jan-09 63 LILO of C.B.Ganj- Bareilly at Dohane D/C Uttar Pradesh 4 Jan-09 64 IB Thermal- Budhipadar 2nd D/C D/C Orissa 52 Jan-09 65 Talegaon 400 kV S/S- Urse 220 kV S/S(1st ckt) D/C Maharashtra 10 Jan-09 66 Hatia-Lohardagga D/C Jharkhand 122 Jan-09 67 LILO of Jeerat- Lakshmikantpur at KLC D/C West Bengal 6 Jan-09 68 LILO of Fatna- Khagaul 1st ckt at Patna(PG) D/C Bihar 16 Jan-09 69 JPL-Raigarh (CSEB) D/C Chhattisgarh 108 Feb-09 70 LILO of B Bagewadi- Indi line at Bijapur D/C Karnataka 11 Feb-09 71 Dhorimanna-Bhinmal S/C Rajasthan 92 Feb-09 72 YTPP-Abdullapur D/C Haryana 56 Feb-09 73 Hissar (Mayyar)-Isharwal D/C Haryana 92 Feb-09¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 847 74 LILO of Mohali-I – Dera Bassi at Mohali-II D/C Punjab 1 Feb-09 75 Mohali-Dera Bassi (2nd ckt stringing) S/C on Punjab 29 Feb-09 D/C 76 LILO of Gajuwaka- VSS at GPL D/C Andhra Pradesh 6 Feb-09 77 LILO of one ckt of Agia- Sarusajai at Boko S/S D/C Assam 1 Feb-09 78 Shivpuri-Sabalgarh D/C Madya Pradesh 200 Mar-09 79 NSPCL-BSP MSDS-6 D/C Chhattisgarh 8 Mar-09 80 Kiron- Bhuna D/C Haryana 60 Mar-09 81 Moga (400 KV) - Bagha Purana D/C Punjab 20 Mar-09 82 Duburi-Paradeep D/C Orissa 226 Mar-09 83 Gajwel 400 kV S/S -Kamareddy S/C on D/C S/C Andhra Pradesh 66 Mar-09 84 Theur - Magarpatta(LILO of Theur- Phursungi at D/C Maharashtra 25 Mar-09 Magarpatta) 85 LILO of Maneri I-Rishikesh at Maneri II D/C Uttarakhand 4 Mar-09 TOTAL 220 kV LINES (SS) 3224 Total SS (400+220)kV 4576 TOTAL CKM OF 400 kV LINES (ALL INDIA) FULLY COMPLETED DURING THE 5829 YEAR TOTAL CKM OF 220 kV LINES (ALL INDIA) FULLY COMPLETED DURING THE 3333 YEAR Sub-stations commissioned during 2008-09 Sl. Name of the Sub-station Voltage Executing Capacity Month of No. Ratio Agency completion (kV/kV) (MW/MVA) 400 kV (Sub-station)( CS) 1 Itarsi 400/220 POWERGRID 315 Apr-08 2 Tirunelveli ICT- II 400/220 POWERGRID 315 Apr-08 3 Baripada 400/220 POWERGRID 315 Apr-08 4 Ludhiana ICT-I 400/220 POWERGRID 315 May-08 5 Melakottaiyur ICT-I 400/220 POWERGRID 315 May-08 6 Ludhiana ICT-II 400/220 POWERGRID 315 Jul-08 7 Kankroli S/S ICT I & II 400/220 POWERGRID 945 Sep-08 8 Damoh ICT- I 400/220 POWERGRID 315 Sep-08 9 Melakottaiyur ICT-II 400/220 POWERGRID 315 Sep-08 10 Damoh ICT - II 400/220 POWERGRID 315 Nov-08 11 Tirunelveli ICT-I 400/220 POWERGRID 315 Nov-08 12 Bhatapara ICT-II 400/220 POWERGRID 315 Jan-09 13 Kota S/S 400/220 POWERGRID 630 Mar-09 14 Roorkee S/S 400/220 POWERGRID 315 Mar-09 15 Rajgarh S/S ( 2nd ICT) 400/220 POWERGRID 315 Mar-09 16 Wardha 400/220 POWERGRID 315 Mar-09 17 Udumalpet (PG)(Ext) 400/220 POWERGRID 315 Mar-09 Total (Central Sector) 6300 400 kV (Sub-station)( SS) 1 NSPCL (2x315 MVA) 400/220 Chhattisgarh 315 Apr-08 2 Gajwel ICT –I 400/220 APTRANSCO 315 Sep-08 3 Gajwel ICT –II 400/220 APTRANSCO 315 Mar-09 4 Sarnath Extn.2x(160-100) 400/220 Uttar Pradesh 120 Oct-08 TOTAL (State Sector) 1065 TOTAL(All India) 400/220 7365848 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Sl. Name of the Sub-station Voltage Executing Capacity Month of No. Ratio Agency completion (kV/kV) (MW/MVA) II. 220 kV Sub-station (CS) 1 Sitarganj 220/132 POWERGRID 100 Feb-09 2 Barjora 220/33 DVC 100 Feb-09 3 Durgapur 220/33 DVC 80 Feb-09 TOTAL (Central Sector) 280 220 kV Sub-station (SS) 1 Renganathapuram(2x50) 230/110 Tamil Nadu 50 Apr-08 2 Perambalur Add. Trans. 230/110 Tamil Nadu 100 May-08 3 Palladam 230/110 Tamil Nadu 200 Jun-08 4 Veerapuram 230/110 Tamil Nadu 100 Jun-08 5 Pudhanchandi (Add. Trans) 230/110 Tamil Nadu 100 Jun-08 6 Udayathur (Add.Trans) 230/33 Tamil Nadu 50 Jun-08 7 Korattur (Add.Trans) 230/110 Tamil Nadu 100 Jul-08 8 Oragadam 230/110 Tamil Nadu 100 Aug-08 9 Manali (Add.Trans.) 230/110 Tamil Nadu 100 Aug-08 10 Thiruvalam(Aug.)(100-80) 230/110 Tamil Nadu 20 Oct-08 11 Udayathur (Add.Trans) 230/33 Tamil Nadu 50 Jan-09 12 Kadapperi(Aug.)(2x100-2x80) 230/110 Tamil Nadu 40 Jan-09 13 Amuthapuram 230/33 Tamil Nadu 50 Jan-09 14 Balipara (Tezpur) 220/132 Assam 50 Apr-08 15 Boko 220/132 Assam 50 Feb-09 16 Wada 220/22 Maharashtra 50 Apr-08 17 Pandhanpur 220/22 Maharashtra 50 Jul-08 18 Kolshet 220/22 Maharashtra 50 Jul-08 19 Bhugaon 220/33 Maharashtra 25 Sep-08 20 Bhiwandi II(Kamba) 220/22 Maharashtra 50 Sep-08 21 Kurkambh (50-25) 220/33 Maharashtra 25 Sep-08 22 Kolshet 220/100 Maharashtra 200 Sep-08 23 Bhigwan (Aug.) 220/33 Maharashtra 25 Oct-08 24 Pusad 220/132 Maharashtra 100 Nov-08 25 Malegaon II 220/32 Maharashtra 50 Nov-08 26 Nalasopara 220/22 Maharashtra 50 Nov-08 27 Gangapur (3x100) 220/132 Maharashtra 300 Dec-08 28 Phursungi(2x100) 220/132 Maharashtra 200 Dec-08 29 Wather 220/132 Maharashtra 100 Mar-09 30 Nerul 220/33 Maharashtra 25 Mar-09 31 Magarpatta(3x50) 220/22 Maharashtra 150 Mar-09 32 K.R Pet(Huyoganahally) 220/66 Karnataka 60 May-08 33 Yerandanahalli (3rd Trans.) 220/66 Karnataka 100 Jun-08 34 Shahapur (2nd Trans) 220/110 Karnataka 100 Jun-08 35 Allipura (Add.Trans) 220/110 Karnataka 100 Jul-08 36 Kadavinakote(2x100) 220/66 Karnataka 200 Aug-08 37 HAL 220/66 Karnataka 100 Oct-08 38 Puttur 220/110 Karnataka 100 Dec-08 39 HAL(2nd Trans.) 220/66 Karnataka 100 Jan-09 40 Athani 220/110 Karnataka 100 Jan-09 41 Vrishabhavaathi Valley(2x100) 220/66 Karnataka 100 Feb-09 42 Shiralkoppa(2x100) 220/110 Karnataka 100 Feb-09 43 Bijapur(2x100) 220/110 Karnataka 100 Feb-09 44 Salempur (2nd ICT) 220/132 Haryana 100 May-08 45 Nilokheri S/S (2x100 MVA) 220/132 Haryana 100 Jul-08 46 Ballabhgarh Aug 220/132 Haryana 100 Jul-08 47 Daultabad 2nd ICT 220/66 Haryana 100 Jul-08 48 Durala 220/132 Haryana 100 Nov-08 49 Jorian(Aug.) 220/66 Haryana 100 Nov-08 50 Bhuna (2x 100 MVA) 220/132 Haryana 100 Nov-08850 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 111 Gokarna(3rd Trans.) 220/132 West Bengal 100 Jan-09 112 Bawana DSIDC 220/66 Delhi 100 Feb-09 113 South of Wazirabad (4th ICT) 220/66 Delhi 100 Feb-09 114 GT S/S (Aug)(160-100) 220/33 Delhi 60 Feb-09 115 Barkote(ICT- II) 220/33 Orissa 20 Feb-09 116 Paradeep(1st) 220/132 Orissa 100 Mar-09 TOTAL (State Sector) 220 11034.5 TOTAL (All India) 220 11314.5 Annex-6.3 TRANSMISSION SYSTEM ADDITION DURING 2009-10 Transmission lines commissioned during 2009-10 Sl. Name of the transmission lines No. Executing Line Month of No. of Agency length Completion ckts (CKM) I. 765 KV LINES 1 Bina (PG) – Gwalior (PG) 2nd S/C (initially to be S/C POWERGRID 233 Feb-10 operated at 400kV) 2 Seoni - Bina (initially to be operated at 400KV) S/C POWERGRID 293 Mar-10 3 LILO of 765 kV D/C Tehri -Meerut line at Tehri Pooling D/C POWERGRID 8 Mar-10 Point TOTAL 765kV CKM OF FULLY COMPLETED (AI) DURING THE YEAR 534 Sl. Name of the transmission lines No. Executing Line Month of No. of Agency length Completion ckts (CKM) II. ± 500 kV HVDC LINES 1 +/- 500 KV Balia - Bhiwadi (2500 MW) Bipole POWERGRID 1580 Mar-10 TOTAL CKM OF FULLY COMPLETED (AI) DURING THE YEAR 1580 Sl. Name of the transmission lines No. Executing Line Month of No. of Agency length Completion ckts (CKM) III. 400 KV LINES CENTRAL SECTOR 1 LILO of Ramagundam - Khammam at Warangal D/C POWERGRID 26 Jul-09 2 LILO of 1 ckt of Madurai (PG) - Trichy (PG) at Karaikudi D/C POWERGRID 98 Jul-09 3 Bhiwadi - Agra D/C POWERGRID 418 Aug-09 4 LILO of 1st ckt. Of Kankroli-Zerda at Bhinmal D/C POWERGRID 55 Aug-09 5 Neyveli (Expn.) Sw. Yd.- Neyveli (existing) Sw. Yd. 2xS/C POWERGRID 3 Sep-09 6 LILO of Kahalgaon-Patna at Barh D/C POWERGRID 104 Oct-09 7 Akola - Aurangabad D/C POWERGRID 482 Dec-09 8 LILO of one ckt of Maithon - Jamshedpur line at Mejia D/C POWERGRID 100 Feb-10 9 Bhiwadi - Moga D/C POWERGRID 702 Mar-10 10 Koldam - Nalagarh (Quad) (Powergrid Portion) D/C POWERGRID 90 Mar-10 11 Kankroli - Jodhpur D/C POWERGRID 193 Mar-10 12 LILO of Ballabhgarh - Bhiwadi at Gurgaon D/C POWERGRID 68 Mar-10 13 Damoh – Bhopal (MPEB) D/C POWERGRID 430 Mar-10 14 Udhamalpet - Arasur D/C POWERGRID 131 Mar-10 15 LILO of Neyveli - Sriperumbadur line at puducherry D/C POWERGRID 26 Mar-10¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 851 16 Tirunelveli (PG) - Edamon (KSEB) Multi -Ckt line M/C POWERGRID 327 Mar-10 17 LILO of 1 ckt of exist. Talguppa (KPTCL) -Neelamangla D/C POWERGRID 148 Mar-10 (KPTCL) at Hassan TOTAL 400 kV Lines (CS) 3401 TOTAL 220 kV Lines (CS) 0 Total CS (765 +400+220+132 kV PG only) 5515 Sl. Name of the transmission lines No. Executing Line Month of No. of Agency length Completion ckts (CKM) State Sector (400kV LINES) 1 LILO of Srisailam-Nunna at Vijayawada TPS M/C Andhra Pradesh 24 Jul-09 2 Bhoopalapally -Warangal D/C Andhra Pradesh 90 Feb-10 3 Meramundali-Mendhasal (Chandaka) D/C Orissa 201 Aug-09 4 LILO of one ckt of Hissar- Moga at Hissar TPS D/C Haryana 3 Jul-09 5 Hissar - Fatehbad (1st ckt) S/C Haryana 41 Jan-10 6 LILO of one Ckt of Asoj-Amreli at Chorania D/C Gujarat 39 Jul-09 7 Suratgarh STPS -Bikaner S/C Rajasthan 162 Sep-09 8 LILO Dholpur-Heerapura at Hindaun D/C Rajasthan 8 Dec-09 9 LILO of Koradi- Chandrapura at New Khaperkheda D/C Maharashtra 3 Nov-09 10 LILO of Lonikhand - Padghe at Chakan D/C Maharashtra 2 Dec-09 TOTAL CKM OF FULLY COMPLETED 400 kV LINES (SS) DURING THE YEAR 573 State Sector (220 KV LINES) 1 STPS-Bhadra S/C Rajasthan 114 Apr-09 2 Raj West-Barmer D/C Rajasthan 27 Apr-09 3 LILO Heerapura-Kukas at Renwal D/C Rajasthan 49 May-09 4 Chhabra-Baran-Dahra S/C Rajasthan 138 Jun-09 5 Kankroli (PG)-Debari S/C Rajasthan 63 Aug-09 6 LILO Bhilwara-Pali at Bhilwara 400 kV S/S D/C Rajasthan 10 Sep-09 7 LILO Bhilwara-Bali at Bhilwara 400 kV S/S D/C Rajasthan 6 Sep-09 8 2nd ckt strng.of Banswara- Debair upto Salumber from S/C Rajasthan 87 Sep-09 Banswara end & LILO for 132 kV S/S at Salumber 9 Hindaun (400 kV)-Hindaun (220 kV) D/C Rajasthan 16 Sep-09 10 Link line at STPS end for 400KV STPS Suratgarh-Bikaner S/C Rajasthan 3.5 Sep-09 11 Giral TPS-Barmer 2nd ckt S/C Rajasthan 35 Nov-09 12 Baitoo - Balotra S/C Rajasthan 48 Nov-09 13 Giral TPS-Baitoo S/C Rajasthan 55 Dec-09 14 LILO Bassi - Phulera at GSS SEZ -I D/C Rajasthan 15 Jan-10 15 Kankroli (PG)-Kankroli S/C Rajasthan 8 Mar-10 16 LILO Bikaner- Nagaur at Bikaner (400 kV) D/C Rajasthan 37 Mar-10 17 Merta- Makrana- Kuchaman S/C Rajasthan 108 Mar-10 18 LILO of one ckt of Banswara- Debari at 132 kV GSS D/C Rajasthan 16 Mar-10 Salumber 19 LILO of Sikar- Kuchman at GSS Dhod D/C Rajasthan 6 Mar-10 20 LILO of one ckt of KTPS- Bewar at Gulabpura D/C Rajasthan 13 Mar-10 21 D/C line at approach section of 400 kV GSS Akai and 220 kV D/C Rajasthan 12 Mar-10 bays at 400 kV Akai (Jaisalmer) 22 LILO of Moga- Jagraon at Ajiwal D/C Punjab 3 Apr-09 23 LILO of one ckt. of Fateh Garh Churian- Civil Line Amritsar at D/C Punjab 5 Jul-09 Majitha(Loop in commid.) 24 LILO of one ckt. of Fateh Garh Churian- Civil Line Amritsar at D/C Punjab 5 Dec-09 Majitha(Loop out commid.) 25 Rishikesh-Maneribali Stage-II (3rd ckt) S/C Uttarakhand 79 May-09 26 Ghansali - Chamba S/C Uttarakhand 35 Oct-09 27 Bhauti(PG)-Orai S/C Uttar Pradesh 90 Apr-09 28 Rosa - Hardoi (ckt-I) S/C Uttar Pradesh 59 Jul-09 29 Rosa- Shahjahanpur -I S/C Uttar Pradesh 22 Jul-09 30 LILO of Sultanpur-Gonda at Sohawal D/C Uttar Pradesh 26 Jan-10852 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 31 LILO of Khurja-Muradnagar at Dadri D/C Uttar Pradesh 24 Feb-10 32 Rosa- Shahjahanpur -II S/C Uttar Pradesh 22 Mar-10 33 LILO of Palli - Gurgaon Sector 52 A at Gurgaon Sector 56 D/C Haryana 2 Aug-09 34 Kirori - Masudpur D/C Haryana 24 Oct-09 35 LILO of Jind- Hissar at Kirori D/C Haryana 26 Mar-10 36 LILO of Jind - Hissar at Masudpur D/C Haryana 4 Mar-10 37 LILO of Bawana - Narela at Bawana DSIDC(loop in portion) D/C Delhi 14 Nov-09 38 LILO of Jabalpur-Itarsi(2nd ckt) at Narsinghpur D/C Madhya Pradesh 4 Apr-09 39 LILO of Ist Ckt Itarsi - Bhopal at Hosangabad D/C Madhya Pradesh 12 Apr-09 40 Chindwara- Seoni (PG) D/C Madhya Pradesh 134 Apr-09 41 LILO of 1st Ckt of Damoh - Bina D/C at Sagar D/C Madhya Pradesh 15 Apr-09 42 LILO of 2nd ckt of Pitampur- Ratlam at Bad Nagar D/C Madhya Pradesh 20 Apr-09 43 Makronia- Sagar(Traction feeder) D/C Madhya Pradesh 10 Jul-09 44 LILO of 2nd ckt Itarsi - Bhopal at Hosangabad D/C Madhya Pradesh 11 Jul-09 45 Sujalpur-Rajgarh D/C Madhya Pradesh 144 Sep-09 46 LILO of 1st Ckt Jabalpur-Itarsi at Piparia D/C Madhya Pradesh 7 Oct-09 47 Bhopal(400 kV)-Ashta S/S D/C Madhya Pradesh 194 Jan-10 48 LILO of one ckt of Satpura-Itarsi at Handia D/C Madhya Pradesh 170 Mar-10 49 Theur- Magarpatta(Urse- Talegaon 2nd ckt) S/C Maharashtra 10 Apr-09 50 LILO of Nerul- Trombay at Somkar D/C Maharashtra 1 Apr-09 51 LILO of Pirangut - Hinjwadi I at Hinjwadi-II D/C Maharashtra 10 Sep-09 52 LILO of Bhigwan- Baramati at Baramati Agro, Shetphal D/C Maharashtra 8 Nov-09 53 LILO of Kandalgaon – Chinchwad D/C at Hinjwadi-II D/C Maharashtra 12 Nov-09 54 Chakan- M/s Volks Wagen D/C Maharashtra 5 Dec-09 55 LILO of Wardha- Badnera at 765 kV Deoli S/S D/C Maharashtra 20 Feb-10 56 LILO of Kalwa – Nassik(Ckt-III)at Airoli (Knowledge Park) D/C Maharashtra 1 Mar-10 57 Chorania -Bala D/C Gujarat 59 Jun-09 58 LILO of Vav-Jagadia on Ckt-1 at Kosamba D/C Gujarat 10 Jul-09 59 Rajpur - Dudhrej D/C Gujarat 20 Jul-09 60 Tunda UMPP - Nanikhakhar S/C Gujarat 15 Dec-09 61 Adani(Mundra) - Versana D/C Gujarat 166 Jan-10 62 Mangrol - Mobha D/C Gujarat 219 Feb-10 63 Raigarh 400 kV (PGCIL) S/S – Raigarh S/C Chattisgarh 21 Jun-09 64 Khedamara- Rajnandgaon D/C Chattisgarh 50 Sep-09 65 Bhatapara 400 kV (PGCIL)– Suhela (Bhatapara) D/C Chattisgarh 27 Jan-10 66 LILO of one ckt of Kolhapur - Ponda at Amona D/C Goa 3 Nov-09 67 LILO of Kadur- Nelamangala at Dabaspet (Nelamangala) D/C Karnataka 2 Apr-09 68 Hiriyur - Tallak D/C Karnataka 80 Apr-09 69 Indi- Basavanabagevadi D/C Karnataka 170 Apr-09 70 Link line between Nagjhari-Hubli and Hubli-Gadag line D/C Karnataka 3 Sep-09 71 LILO of Mahalingapur-Bagalkot at Mudol/Vajaramatti D/C Karnataka 2 Sep-09 72 Bidadi-Kothipura(Ramanagar) M/C Karnataka 36 Sep-09 73 UTPS-Nandikur - Khemar (partly on Multi-ckt Multi-Voltage D/C, Karnataka 48 Oct-09 towers & partly on D/C towers) M/C 74 LILO of Mahalingapur-Hubli line at Soundatti D/C Karnataka 9 Dec-09 75 Bastipura - Kadakola D/C Karnataka 44 Feb-10 76 Manali- Tondiarpet D/C Tamil Nadu 18 May-09 77 Meelavittan - M/s Ind Bharat S/C Tamil Nadu 9 Jul-09 78 LILO of Karaikudi - Pudukkottai at Karaikudi 400kV SS D/C Tamil Nadu 7.5 Aug-09 79 LILO of Pugalur-Alundur at Pugalur S/S 400kV S/S D/C Tamil Nadu 18 Aug-09 80 Amathapuram- Chekkanoorani S/C on Tamil Nadu 110 Oct-09 D/C 81 LILO of Tondiarpet- Mylapore at Basin Bridge D/C Tamil Nadu 2 Nov-09 82 Arasur 400kV S/S- Arasur 230kV S/S D/C Tamil Nadu 43 Jan-10 83 Malumichampatty- Common point- Myvadi S/C Tamil Nadu 58 Jan-10 84 Sriperumbudur 400kV S/S- Sripermbudur Sipcot 230 kV S/S S/C on Tamil Nadu 15 Jan-10 D/C 85 Tirunelveli 400kV S/S - Udayathur S/C on Tamil Nadu 69 Feb-10 D/C¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 853 86 M/s Ind Bharat- Chekkanoorani D/C & Tamil Nadu 154 Mar-10 S/C 87 LILO of Kayamkulam-Edaman (ckt-2) at Edappon D/C Kerala 17 Jun-09 88 Tap line to Vadakara S/S D/C Kerala 2 Aug-09 89 Garividi - Boddepallipeta S/C on Andhra Pradesh 44 Jul-09 D/C 90 Boddepallipeta-Tekkali S/C on Andhra Pradesh 44 Jul-09 D/C 91 RTPP-Pulivendula D/C Andhra Pradesh 82 Dec-09 92 LILO of VTS- Podili at Nasararaopet D/C Andhra Pradesh 4 Dec-09 93 LILO of Sonenagar- Garhwa D/C at Japla D/C Jharkhand 8 May-09 94 Biharshariff- Begusarai D/C Bihar 150 Nov-09 95 Budhipadar-Bolangir D/C Orissa 312 Jan-10 96 Tinsukia- Namrup D/C Assam 80 Apr-09 TOTAL CKM OF FULLY COMPLETED 220 kV LINES (SS) DURING THE YEAR 4325 400kV Lines (Private Sector) 1 Mundra-Dehgam D/C Adani Power Ltd 868 Jul-09 2 LILO of RTPS- Guttur at Thorangallu JSW S/S D/C JSW Energy Ltd 16 Aug-09 3 Kondapalli - Nunna D/C Lanco 44 Oct-09 TOTAL CKM OF FULLY COMPLETED 400 kV LINES (PS) DURING THE YEAR 928 Private Sector 1 Akhakol-Puna D/C Torrent Power 72 May-09 2 Akhakol-Bhatar D/C Torrent Power 136 May-09 3 Akhakol-Ved(Dabholi) D/C Torrent Power 52 Jun-09 4 Budge Budge -Kosba D/C CESC 170 Feb-10 Total CKM OF 220 kV LINES (PS ) 430 TOTAL CKM OF FULLY COMPLETED 400 kV LINES (All India) DURING THE YEAR 4902 TOTAL CKM OF FULLY COMPLETED 220 kV LINES (All India) DURING THE YEAR 4755 Sub-stations commissioned during 2009-10 Sl. Name of the Sub-station Voltage Executing Capacity Month of No. Ratio Agency completion (kV/kV) (MW/MVA) I. 500 kV HVDC(Sub-station) 1 Converter station at Balia & 1250 Mar-10 Bhiwadi (2x1250 MW) TOTAL (Central Sector) 1250 Sl. Name of the Sub-station Voltage Executing Capacity Month of No. Ratio Agency completion (kV/kV) (MW/MVA) II. 400 kV (Sub-station) Central Sector 1 Trivandrum (PG)(Ext) (1x315) 400/220 POWERGRID 315 Jun-09 2 Warrangal S/S (2x315) 400/220 POWERGRID 630 Jul-09 3 Karaikudi S/S (2x315) 400/220 POWERGRID 630 Jul-09 4 Bhimnal S/Stn.(2x315)1st ICT 400/220 POWERGRID 630 Aug-09 5 Pugalur S/S (2x315) 400/222 POWERGRID 630 Aug-09 6 Roorkee S/S (2nd ICT) 400/220 POWERGRID 315 Mar-10 7 Ludhiana (3rd ICT) 400/220 POWERGRID 315 Mar-10 8 Hissar 3rd ICT (1x315) 400/220 POWERGRID 315 Mar-10 9 Gurgaon GIS S/Stn.(2x315) 400/220 POWERGRID 315 Mar-10 10 Wardha Sub station (2x315) 2nd Trans. 400/220 POWERGRID 315 Mar-10854 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 11 Solapur 400/220 POWERGRID 630 Mar-10 12 Arasur S/S (2x315) 400/220 POWERGRID 630 Mar-10 13 Pondicherry S/S (2x315) 400/220 POWERGRID 630 Mar-10 14 Hassan S/S 400/220 POWERGRID 630 Mar-10 TOTAL (Central Sector) 6930 1 Mendhasal (2x315) 400/220 Orissa 630 Aug-09 2 Durgapur(6x105) 400/220 West Bengal 630 Dec-09 3 Chakan S/S (3x105) 400/220 Maharashtra 315 Dec-09 4 Jejuri (3x167) 400/220 Maharashtra 500 Jan-10 5 Bikaner S/S (1X315) 400/220 Rajasthan 315 Mar-10 TOTAL (State Sector) 2390 Sl. Name of the Sub-station Voltage Executing Capacity Month of No. Ratio Agency completion (kV/kV) (MW/MVA) lII. 220 kV (Sub-station) Central Sector 1 Sitarganj 2nd ICT 220/132 POWERGRID 100 Jul-09 2 Kopili S/S Extn. 220/132 POWERGRID 160 Mar-10 3 Dimapur S/S Extn. 220/132 POWERGRID 100 Mar-10 TOTAL (Central Sector) 360 State Sector 1 Guragaon Aug(Sector-52A) 3rd Tr. 220/66 Haryana 100 Apr-09 2 Isharwal 220/132 Haryana 100 Apr-09 3 Pehowa Aug (100-50) 220/132 Haryana 50 Jun-09 4 Cheeka Aug (3rd) 220/132 Haryana 100 Jun-09 5 Nissing Aug (3rd) 220/132 Haryana 100 Jun-09 6 Bhuna (2nd Trans.) 220/132 Haryana 100 Jul-09 7 Guragaon Aug(Sector-56) 220/66 Haryana 100 Aug-09 8 Kartarpur (Aug) (2nd) 220/66 Punjab 100 Apr-09 9 Mohali-II (New) 220/66 Punjab 100 Aug-09 10 Bagha Purana (U/G) 220/66 Punjab 100 Aug-09 11 Majitha (U/G) 220/66 Punjab 100 Aug-09 12 Ajitwal 220/66 Punjab 100 Oct-09 13 Renwal 220/132 Rajasthan 100 May-09 14 Baran 220/132 Rajasthan 100 May-09 15 Bhadra 220/132 Rajasthan 100 May-09 16 Mahindra SEZ 220/132 Rajasthan 100 Mar-10 17 Gulabpura 220/132 Rajasthan 100 Mar-10 18 Dhod 220/132 Rajasthan 100 Mar-10 19 DSIDC Bawana (2nd Trans.) 220/66 Delhi 100 Jul-09 20 Basti Aug. (160-100) 220/132 Uttar Pradesh 60 Apr-09 21 Sultanpur Aug.(160-100) 220/132 Uttar Pradesh 60 Aug-09 22 Sikandrabad 220/132 Uttar Pradesh 100 Oct-09 23 Muzaffarnagar 220/132 Uttar Pradesh 100 Jan-10 24 Sohawal 220/132 Uttar Pradesh 100 Jan-10 25 Sonkhar 220/33 Maharashtra 50 Apr-09 26 Tembhurni 220/33 Maharashtra 25 Apr-09 27 Magarpatta 220/22 Maharashtra 150 Apr-09 28 Wathar 220/132 Maharashtra 100 Jun-09 29 Wathar 220/33 Maharashtra 50 Jun-09 30 Temghar 220/22 Maharashtra 50 Aug-09 31 Washala 220/22 Maharashtra 25 Aug-09 32 Hinjewadi II S/S 220/22 Maharashtra 50 Oct-09 33 Mahape (3rd Trans.) 220/22 Maharashtra 50 Jan-10 34 Temghar (2nd Tranf.) 220/22 Maharashtra 50 Jan-10 35 Mahad 220/22 Maharashtra 50 Mar-10 36 Airoli (Knowledge Park) 220/22 Maharashtra 50 Mar-10 37 Panvel (3rd Trans.) 220/33 Maharashtra 50 Mar-10¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 855 38 Sidhi S/S 220/132 Madhya Pradesh 160 May-09 39 Rajgarh (Biaora) 220/132 Madhya Pradesh 160 Sep-09 40 Beragarh 220/132 Madhya Pradesh 160 Sep-09 41 Nagda 220/132 Madhya Pradesh 160 Sep-09 42 Indore(South Zone) 220/132 Madhya Pradesh 160 Sep-09 43 Badnagar 220/132 Madhya Pradesh 160 Oct-09 44 Chindwara 220/132 Madhya Pradesh 160 Nov-09 45 Piparia 220/132 Madhya Pradesh 160 Jan-10 46 Astha 220/132 Madhya Pradesh 100 Jan-10 47 Badnagar (2nd Traf.) 220/132 Madhya Pradesh 160 Jan-10 48 Bhopal (Chambal) Addl.Tr. 220/132 Madhya Pradesh 100 Mar-10 49 Rajnandgaon 220/132 Chhattisgarh 160 Sep-09 50 Raigarh 220/132 Chhattisgarh 160 Jul-09 51 Amona (2x50 ) 220/33 Goa 100 Nov-09 52 Bala (2x50) 220/11 Gujarat 100 Nov-09 53 Dudhrej (2x25) 220/11 Gujarat 50 Nov-09 54 Tallak(2ndTrans.) 220/66 Karnataka 100 Apr-09 55 Haskote 220/66 Karnataka 100 Apr-09 56 Dabaspet (Nelamangala) 220/66 Karnataka 100 Apr-09 57 HSR layout(2x150- 2x100) 220/66 Karnataka 100 Apr-09 58 Shiralkoppa 220/110 Karnataka 100 Apr-09 59 Sindhanur (1st) 220/110 Karnataka 100 Apr-09 60 Indi (2x100) 220/110 Karnataka 200 Apr-09 61 Naganathapura (1st Trans) 220/66 Karnataka 100 Jun-09 62 Vajramatti (2x100) 220/110 Karnataka 200 Oct-09 63 Ranebennur(Addl.Trans.) 220/110 Karnataka 100 Oct-09 64 Kustagi (Addl.trans.) 220/110 Karnataka 100 Nov-09 65 Soundatti 220/110 Karnataka 100 Mar-10 66 Naganathapura (2nd Trans.) 220/66 Karnataka 100 Dec-09 67 Sriperumbudur SIPCOT 230/110 Tamil Nadu 100 Apr-09 68 Nokia 230/110 Tamil Nadu 100 Apr-09 69 Ponnapuram (Addl. Trans.) 230/110 Tamil Nadu 100 Apr-09 70 Kadapperi 3rd(80 to 100 MVA) 230/110 Tamil Nadu 20 Apr-09 71 Palladam Addl.Trans. 230/110 Tamil Nadu 100 May-09 72 Mettur (Aug.) 230/110 Tamil Nadu 100 Jun-09 73 Perambalur (Aug.)(100-50) 230/110 Tamil Nadu 50 Jul-09 74 Arni (Addl.Trans.) 230/110 Tamil Nadu 80 Aug-09 75 Thiruvalam Addl.Trans. 230/110 Tamil Nadu 100 Sep-09 76 Alundur (Aug.)(100-50) 230/110 Tamil Nadu 50 Sep-09 77 Amuthapuram Addl.Trans. 230/33 Tamil Nadu 50 Oct-09 78 Renganathapuram Addl.Trans. 230/110 Tamil Nadu 100 Oct-09 79 Koratur Aug.(80 to 100 MVA) 230/110 Tamil Nadu 20 Oct-09 80 Basin Bridge(GMR Vasavi) 230/110 Tamil Nadu 100 Nov-09 81 Vinnamangalam Aug.(100-50) 230/110 Tamil Nadu 50 Nov-09 82 Nethimedu Aug.(100- 80) 230/110 Tamil Nadu 20 Dec-09 83 Thiruvalam Aug. (100-75) 230/110 Tamil Nadu 25 Jan-10 84 Udayathur 230/110 Tamil Nadu 100 Mar-10 85 Othakalmandapam (3rd Tr.) 230/110 Tamil Nadu 100 Mar-10 86 Salem Aug.(100- 80) 230/110 Tamil Nadu 20 Mar-10 87 Vadakara 220/110 Kerala 100 Aug-09 88 Vadakara 2nd Trans. 220/110 Kerala 100 Dec-09 89 Kundra 220/110 Kerala 200 Dec-09 90 Gajwel 2nd Trans. 220/132 Andhra Pradesh 100 Nov-09 91 Pulivendula 220/132 Andhra Pradesh 100 Dec-09 92 Nasararaopet 220/132 Andhra Pradesh 100 Dec-09 93 Nellore(Manuboin) 220/132 Andhra Pradesh 100 Dec-09 94 New Town AA-III (2x160) 220/132 West Bengal 320 Jul-09 95 New Town AA-III (2x50) 220/33 West Bengal 100 Jul-09 96 Subhasgram 220/132 West Bengal 160 Sep-09 97 Arambag(Aug.) 220/132 West Bengal 160 Sep-09856 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 98 Biharshariff Extn. 220/132 Bihar 150 Apr-09 99 Begusarai(2x100) 220/132 Bihar 200 Nov-09 100 Paradeep (2nd Traf.) 220/132 Orissa 100 Sep-09 101 Bhadrak (2nd Traf) 220/132 Orissa 100 Sep-09 102 Samaguri (Aug.) 220/132 Assam 50 Sep-09 103 Namrup (Aug)(2x50) 220/132 Assam 100 Oct-09 TOTAL (State Sector) 220 10195 JV/Private Sector 1 Puna (2x160 MVA) 220/66 Torrent Power 160 May-09 2 Bhatar (2x160 MVA) 220/66 Torrent Power 160 May-09 3 Ved (Dabhol) (2x160 MVA) GIS 220/66 Torrent Power 160 Jun-09 4 Puna (2nd Trans.) 220/66 Torrent Power 160 Jul-09 5 Bhatar (2nd Trans.) 220/66 Torrent Power 160 Jul-09 6 Ved (Dabhol) (2nd Trans) GIS 220/66 Torrent Power 160 Aug-09 7 Kosba (3x160) 220/132 CESC Limited 480 Nov-09 Total(JV/PS) 1440 TOTAL (All India) 400 9320 TOTAL (All India) 220 11995 Annex-6.4 TRANSMISSION SYSTEM ADDITION DURING 2010-11 Transmission lines commissioned during 2010-11 Sl. Name of the transmission lines No. Executing Line Month of No of Agency length Completion ckts I. 400 KV LINES 400kV lines(CS) 1 Barh-Balia (Quad) D/C POWERGRID 488 Jun-10 2 Bahadurgarh-Sonepat line (Triple Cond.) D/C POWERGRID 104 Jul-10 3 Raigarh - Raipur D/C POWERGRID 440 Sep-10 4 Maithon RB - Maithon (PG) D/C POWERGRID 62 Sep-10 5 Kanpur - Ballabgarh D/C POWERGRID 743 Oct-10 6 Gorakhpur - Lucknow D/C POWERGRID 528 Oct-10 7 Meerut -Kaithal (Q) (HSIL) D/C POWERGRID 327 Oct-10 8 Birsinghpur (MPGENCO) – Damoh D/C POWERGRID 457 Oct-10 9 Ranchi-Rourkela D/C POWERGRID 290 Nov-10 10 Pirana-Dehgam D/C POWERGRID 94 Dec-10 11 Durgapur-Jamshedpur Part line for LILO at Andal (to D/C POWERGRID 38 Jan-11 facilitae start up power at Durgapur STPS) 12 Parli (MSETCL) – Parli (PG) D/C POWERGRID 10 Feb-11 13 Koteshwar -Tehri Pooling Point D/C POWERGRID 5 Mar-11 14 Chamera Pooling Station - Chamera-II HEP (Part-I) S/C POWERGRID 1 Mar-11 15 Abdullapur - Sonepat D/C POWERGRID 291 Mar-11 16 Bhadravati(PG)-Parli(PG) D/C POWERGRID 768 Mar-11 17 LILO of Bina - Nagda at Sujalpur D/C POWERGRID 44 Mar-11 18 LILO of Durgapur-Jamshedpur (PG) at Durgapur STPS D/C DVC 7 Jan-11 19 LILO of Maithon-Ranchi (PG) at Raghunathpur D/C DVC 21 Mar-11 Total CKM OF 400 kV LINES (CS) Completed during the Year 4718 400kV lines(SS) 1 LILO of Ramagundam -Ghanapur at Malkaram D/C APTRANSCO 52 Apr-10 2 KothagudamTPS - Khammam D/C APTRANSCO 136 Mar-11 3 Bhusaval - II - existing Khadka D/C MSETCL 15 Apr-10 4 Hissar - Kirori D/C HVPNL 13 Sep-10 5 Hissar - Fatehbad D/C HVPNL 90 Sep-10 6 Jhajjar - Daultabad (1st ckt.) D/C HVPNL 68 Jan-11 7 Jhajjar - Daultabad (2nd ckt.) D/C HVPNL 68 Feb-11¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 857 8 Chhabra-Hindaun S/C+ RRVPNL 342 Apr-10 D/C 9 Rajwest- Jodhpur D/C RRVPNL 417 May-10 10 Rajwest- Barmer (1st ckt) S/C RRVPNL 15 May-10 11 Dahra(Kota)-Bhilwara S/C+ RRVPNL 187 Oct-10 D/C 12 Jaisalmer- Barmer S/C RRVPNL 143 Nov-10 13 Jodhpur - Merta (2nd Ckt) S/C RRVPNL 97 Jan-11 14 KTPS-Kota(PG) (to be charged at 220 kV) D/C RRVPNL 13 Mar-11 15 Rajwest- Barmer (2nd ckt) S/C RRVPNL 15 Mar-11 16 LILO of Bamnauli - Bawana at Mundka D/C DTL 1 Feb-11 17 Dabhol-Nagothane Ckt.-II S/C MSETCL 137 Jun-10 18 Versana-Hadala D/C GETCO 318 Nov-10 19 Mundra(Adani) -Versana D/C GETCO 168 Feb-11 20 LILO Farakka-Subhasgram S/C at Sagardighi D/C WBSTCL 13 Nov-10 21 Limbdi(Choania) (GETCO)- Ramchandpura(Vadavi) D/C GETCO 206 Mar-11 (GETCO) TOTAL CKM OF FULLY COMPLETED 400 kV LINES (SS) DURING THE YEAR 2514 400kV lines(PS) 1 Sugen - Jhanor D/C Torrent Power 160 Jul-10 2 Jaigad - New Koyna (ckt 1) S/C JSW Energy 55 Jul-10 3 Jaigad - New Koyna (ckt 2) S/C JSW Energy 55 Aug-10 4 Jhajjar - Mundka (1st ckt ) S/C APCPL 62 Sep-10 5 Jhajjar - Mundka (2nd ckt ) S/C APCPL 70 Nov-10 6 LILO of Solapur -Karad at Solapur(POWEGRID) D/C Reliance Power 230 Jan-11 7 Jhanor-Pirana via Pirana TPL D/C on Torrent Power 284 Feb-11 M/C 8 LILO of Rourkela- Raigarh at Sterlite TPP D/C Sterlite TPP 54 Feb-11 TOTAL CKM OF FULLY COMPLETED 400 kV LINES (PS) DURING THE YEAR 970 TOTAL CKM OF 400 kV LINES (ALL INDIA) 8202 Sl. Name of the transmission lines No. Executing Line Month of No of Agency length Completion ckts II. 220 KV LINES 220 KV LINES(CS) 1 Vapi -Khadoli (UT of DNH) D/C POWERGRID 62 Sep-10 2 Kalyaneshwari - Pithakari D/C DVC 16 Jul-10 3 LILO of Kalyaneshwari-ChandrapuraTPS at Dhanbad 2xD/C DVC 8 Mar-11 4 Loop in of both ckts of Chandrapura TPS-MTPS at D/C DVC 90 Mar-11 Kalyaneshwari -ckt I 5 Loop out of both ckts of Chandrapura TPS-MTPS at D/C DVC 92 Mar-11 Kalyaneshwari- ckt II TOTAL CKM OF FULLY COMPLETED 220 kV LINES (CS) DURING THE YEAR 206 220 KV LINES(SS) 1 Cheeka-Durala D/C HVPNL 100 May-10 2 Bastra- Kaul D/C HVPNL 90 Oct-10 3 Pehowa-Kaul line D/C HVPNL 33 Oct-10 4 LILO of PTPS -Safidon line at Bastara D/C HVPNL 27 Oct-10 5 YTPP(DCRTPP) -Nilokheri D/C HVPNL 104 Nov-10 6 Sonepat(Jajjy)-Mohana S/S D/C HVPNL 6 Nov-10 7 PTPP-Bastra line D/C HVPNL 28 Nov-10 8 Sampla-Mohana line D/C HVPNL 69 Feb-11 9 Mohana-Smalkha line D/C HVPNL 55 Feb-11 10 Nalagarh-Mohali -I (length of line corrected as per D/C PSTCL 111 May-10 actual) 11 Mansa- HPCL Mittal Energy Ltd (Deposit Work) D/C PSTCL 97 May-10 12 GHTP-Himatpura D/C D/C PSTCL 81 Jul-10 13 LILO of one circuit of GGSSTP – Mohali-I at Kharar D/C PSTCL 6 Jul-10858 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 14 LILO of one ckt of Verpal- Palli at Taran Taran D/C PSTCL 13 Jul-10 15 Mohali-Rajpura D/C PSTCL 13 Oct-10 16 LILO of Malerkotla – Lalton Kalan S/C at Pakhowal D/C PSTCL 2 Oct-10 17 LILO of one ckt. of Moga- Mukatsar DC at Sadiq D/C PSTCL 38 Dec-10 18 LILO of Bhatinda -Mukatsar line at Malout D/C PSTCL 48 Jan-11 19 LILO of Lalton Kalan-Humbran at Ferozpur Road D/C PSTCL 10 Mar-11 Ludhiana 20 LILO of Bassi-Phulera at GSS Bagru D/C RRVPNL 9 May-10 21 LILO Kota-Bhilwara at Kota (PG) D/C RRVPNL 4 Jun-10 22 Hindaun (400 kV)-Mandawar S/C RRVPNL 47 Sep-10 23 LILO of both ckts of Amarsagar - Barmer at Akai 2xD/C RRVPNL 77 Sep-10 (Jaisalmer) 24 LILO of Bikaner-Nagaur line at GSS Nokha S/C RRVPNL 6 Sep-10 25 LILO of Hissar – Khetri at Chirawa D/C RRVPNL 38 Nov-10 26 Bhinmal(PG) -Sanchore (RVPN) S/C RRVPNL 67 Mar-11 27 Barsinghsar TPS-Phalodi S/C RRVPNL 123 Mar-11 28 LILO one ckt Bassi-Heerapura at Jagatpura D/C RRVPNL 18 Mar-11 29 Dhorimana - Sanchore (jalore) S/C RRVPNL 64 Mar-11 30 Neemrana-Kotputli D/C RRVPNL 88 Mar-11 32 Pindwara GSS- M/S J.K. laxmi cement S/C RRVPNL 20 Mar-11 33 LILO of Chittorgarh-Nimbahera at GSS sawa D/C RRVPNL 5 Mar-11 34 LILO of Badarpur- Alwar at GSS MIA Alwar D/C RRVPNL 5 Mar-11 35 LILO of Kankroli-sirohi at Bali D/C RRVPNL 3 Mar-11 36 Metore(Meerut) (PG)-Gajraula S/C UPPTCL 87 Jun-10 37 LILO of Moradabad-NAPP at Sambhal D/C UPPTCL 3 Jun-10 38 Muzaffarnagar-Shamli S/C UPPTCL 56 Nov-10 39 LILO of Agra(400)-Ferozabad at Shamshabad D/C UPPTCL 50 Dec-10 40 Roza - Badaun D/C UPPTCL 192 Jan-11 41 LILO of Saharanpur-Shamli at Nanauta D/C UPPTCL 6 Jan-11 42 Nanauta - Muzaffarnagar S/C UPPTCL 65 Mar-11 43 LILO of Mainpuri (PG)-Harduaganj Line at Etah D/C UPPTCL 20 Mar-11 44 Ridge Valley - Naraina S/C DTL 5 Sep-10 45 LILO of Mehrauli - Bamnauli at DIAL (2x2x6kM) D/C DTL 24 Sep-10 46 LILO of Bawana-Narela at Khanjawla(2xD/C)(1st ckt) D/C DTL 7 Feb-11 47 U/G of Maharani Bagh(PG)-Masjid Moth D/C DTL 19 Mar-11 48 Kashipur - Barheni D/C PTCUL 54 Jan-11 49 Barheni - Pantnagar S/C PTCUL 71 Jan-11 50 Kangoo-Rauri (1st Ckt ) S/C HPSEBL 24 Feb-11 51 Kangoo-Rauri (2nd Ckt) S/C HPSEBL 24 Mar-11 52 Reru Majra (PGCIL)-Uperla Nangal (Nalagarh) D/C HPSEBL 7 Mar-11 53 Khodri-Majri (2nd circuit) S/C on HPSEBL 35 Mar-11 D/C 54 Versana- Morbi D/C GETCO 214 Apr-10 55 LILO of Kasor- Vertej at Botad D/C GETCO 39 Jun-10 56 LILO of Kansari- Tharad at Lakhani D/C GETCO 1 Jun-10 57 Viramgam- Salejada D/C GETCO 118 Jul-10 58 LILO of Viramgam- Salejada at Bhat M/C GETCO 71 Jul-10 59 Tappar-Varsana line D/C GETCO 8 Nov-10 60 LILO Wanakbori-Ranasan Ckt II at Kapadvanj D/C GETCO 30 Nov-10 61 Utran - Kosamba Line-I D/C GETCO 86 Feb-11 62 LILO of Gwalior-Malanpur at Gwalior 400 kV (PG) D/C MPPTCL 17 Apr-10 63 Jabalpur-Narsinghpur D/C MPPTCL 153 Apr-10 64 Chegaon-Nimrani D/C MPPTCL 205 Apr-10 65 LILO of one ckt of Satpura-Itarsi at Handia D/C MPPTCL 170 Apr-10 66 LILO of Barwaha- Khandwa at Chhegaon new S/S D/C MPPTCL 4 Apr-10 67 LILO of Indore- Ujjain at Indore II S/S D/C MPPTCL 2 Apr-10 68 Maheshwar - Nimrani D/C MPPTCL 54 May-10 69 Astha- Bercha S/C MPPTCL 50 May-10 70 Chhindwara-Betul D/C MPPTCL 266 Jul-10 71 LILO of Satna-Bansagar At Kotar D/C MPPTCL 8 Sep-10¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 859 72 LILO of Khandwa - Nepanagar at Chhegaon new S/S D/C MPPTCL 35 Jan-11 73 LILO Amarkantak-Birsinghpur at Sukha (PG) 2xD/C 2xD/C MPPTCL 332 Feb-11 74 Satna-Chhatarpur S/C on MPPTCL 156 Feb-11 D/C 75 LILO of One Ckt.of Bhopal-Bina at Vidisha D/C MPPTCL 42 Mar-11 76 Dewas - Astha D/C MPPTCL 144 Mar-11 77 LILO of Theur- Magarpatta at M/s Serum Institute D/C MSETCL 1 Jun-10 78 LILO of Chandrapur- Warora at Wani D/C MSETCL 46 Jul-10 79 LILO of Karad-Miraj at Kadegaon D/C MSETCL 5 Nov-10 80 Rajgoli to Halkarni S/S S/C on MSETCL 22 Dec-10 D/C 81 LILO of Pusad – Girwali (ckt-1) at Hingoli D/C MSETCL 44 Feb-11 82 LILO of 2nd ckt Kolhapur-Phonda at Halkarni D/C MSETCL 19 Feb-11 83 Khedamara- Bemtra D/C CSPTCL 50 Jun-10 84 LILO of Raipur(PG)- Suhela (Bhatapara) at Doma D/C CSPTCL 42 Sep-10 85 NSPCL-BSP MSDS-5 D/C CSPTCL 7 Feb-11 86 LILO of Korba-Siltara at Mopka D/C CSPTCL 24 Mar-11 87 Oglapur 400kV S/S-Nagaram D/C APTRANSCO 25 Apr-10 88 LILO of Tadikonda- Ongole at Parchur D/C APTRANSCO 7 Jun-10 89 Veltoor- Wanaparthy D/C APTRANSCO 40 Sep-10 90 LILO of Narnoor -Wanaparthy at Brahmanakotkur D/C APTRANSCO 26 Nov-10 91 LILO of HIAL-Gachibowli line at Sivarampalli D/C APTRANSCO 1.5 Nov-10 92 Brahmanakotkur- Malyala D/C APTRANSCO 21 Feb-11 93 Kalpaka S/S - Ms. Brandix (part line) D/C APTRANSCO 22 Mar-11 94 Dhone - Kambalapadu S/C on APTRANSCO 12 Mar-11 D/C 95 Krishnagiri - Settipally S/C on APTRANSCO 11 Mar-11 D/C 96 Kambalapadu- Lakkasagaram S/C on APTRANSCO 9 Mar-11 D/C 97 LILO from Gooty- Alipura at Regulapadu D/C APTRANSCO 22 Mar-11 98 LILO of Pulakurthy -Ramppa at Nagaram sw.station D/C APTRANSCO 3 Mar-11 99 LILO of VTS- Narketpally at Chilakallu D/C APTRANSCO 5 Mar-11 100 LILO of Medchal- Minpur at Gajwel D/C APTRANSCO 80 Mar-11 101 LILO of Pulakurthy -Ramppa at salivgu D/C APTRANSCO 0.7 Sep-10 102 Elephant Gate- Tondiarpet S/C Tantransco 5 Jun-10 103 Valuthur - Paramakudi S/C on D/C S/C Tantransco 50 Jun-10 104 Gobi -Mettur TPS S/C on Tantransco 82 Jun-10 D/C 105 S.P.Koil-Tharamani (Perambakkam-Tharamani portion) S/C Tantransco 49 Aug-10 106 Othakalmandapam-Common point -Ponnapuram S/C Tantransco 62 Aug-10 107 LILO of S.P.Koil -Tharamani line at KITS Park SS S/C Tantransco 1 Sep-10 108 LILO of NCTPS- Mosur at NCTPS Stage II (for startup D/C Tantransco 3 Nov-10 power) 109 Sriperumbadur SIPCOT- Sunguvarchatram 400 kV S/S D/C Tantransco 12 Mar-11 110 LILO of Mysore - Shimoga line at Hassan(Shanthigrama) 2xD/C KPTCL 28 Dec-10 111 Narendra 400 kV S/S- Ghataprabha D/C KPTCL 191 Dec-10 112 Narendra S/S- MK Hubli S/S S/C KPTCL 34 Dec-10 113 LILO of Hootagalli-TK Hali -Vajamangala D/C KPTCL 3 Dec-10 114 varahi-Shimoga D/C KPTCL 9 Dec-10 115 Peenya-NRS D/C KPTCL 8 Dec-10 116 Anand rao Circle-Nimhas-HAL S/C KPTCL 17 Dec-10 117 Narendra-KIDAB M/C on KPTCL 4 Dec-10 D/C line 118 Basthipura-Kushalanagara D/C KPTCL 154 Mar-11 119 Areacode(PGCIL)400kV S/S- Areacode S/S M/C KSEB 1 Mar-11 120 LILO of Villlianur-Bahour at Ramnathpuram D/C Puduchurry Ele. 29 Oct-10 Dept. 121 LILO of Jeerut-Kasba line at New Town AA-III D/C WBSETCL 2 Nov-10 122 LILO of Hazipur-Muzaffapur (Kanti) at Muzaffapur(PG) D/C BSEB 15 Nov-10860 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 123 Begusarai-Muzaffapur (Kanti) (MTPS) Line D/C BSEB 304 Nov-10 124 Kuchei-Balasore(Ckt-II) S/C OPTCL 76 Jan-11 125 Narendrapur-Mendhasal (Ckt-II) S/C OPTCL 170 Jan-11 126 Misa - Byrnihat D/C MeSEB 226 Aug-10 TOTAL CKM OF FULLY COMPLETED 220 kV LINES (SS) DURING THE YEAR 6539 220 kV LINES (PS ) 1 Sterlite TPP - Sterlite captive plant D/C D/C Sterlite 9 Aug-10 2 Allain Duhangan-Panarsa-Nalagarh D/C D/C AD Hydro 349 Sep-10 Total CKM OF 220 kV LINES (PS ) 358 TOTAL CKM OF 220 kV LINES (ALL INDIA) FULLY COMPLETED 7165 DURING THE YEAR Sub-stations commissioned during 2010-11 Sl. No. Name of the Sub-station Voltage Executing Capacity Month of Ratio Agency completion (kV/kV) (MW/MVA) 400kV (substation) (CS) 1 Sonepat (1st Transf) 400/220 POWERGRID 315 Sep-10 2 Maharanibagh GIS Extn(1st Trf) 400/220 POWERGRID 500 Sep-10 3 Pune 400/220 POWERGRID 630 Oct-10 4 Bina 400/220 POWERGRID 315 Oct-10 5 Sonepat (2nd Transf) 400/220 POWERGRID 315 Nov-10 6 Maharanibagh GIS Extn(2nd) 400/220 POWERGRID 500 Nov-10 7 Pirana(1st Tranf) 400/220 POWERGRID 315 Feb-11 8 Muvattapuzha s/s (1st Transf) 400/220 POWERGRID 315 Feb-11 9 Wagoora S/Stn. 4th ICT(3x105) 400/220 POWERGRID 315 Mar-11 10 Malerkotla Extn. 400/220 POWERGRID 500 Mar-11 11 Pirana (2nd Transf) 400/220 POWERGRID 315 Mar-11 12 Gwalior Extn. 400/220 POWERGRID 315 Mar-11 Total PGCIL 4650 DVC 0 TOTAL (Central Sector) 4650 400kV (substation) (SS) 1 Kirori 400/220 HVPNL 630 Apr-10 2 Kirori (3rd Trans.) 400/220 HVPNL 315 May-10 3 Daultabad 400/220 HVPNL 630 Nov-10 4 Daultabad (3rd Trans.) 400/220 HVPNL 315 Dec-10 5 Hindaun S/S (1x315) 400/220 RRVPNL 315 Sep-10 6 Bhilwara S/S (1x315) 400/220 RRVPNL 315 Nov-10 7 Barmer S/S (1x315) 400/220 RRVPNL 315 Nov-10 8 Akai (Jaisalmer) 400/220 RRVPNL 315 Nov-10 9 Akai (Jaisalmer) (2nd Trf.) 400/220 RRVPNL 315 Dec-10 10 Mundka (1st Trf.) 400/220 DTL 315 Sep-10 11 Mundka (2nd Trf.) 400/220 DTL 315 Mar-11 12 Bawana (2x315) 400/220 DTL 630 Mar-11 13 Katni 400/220 MPPTCL 315 May-10 14 Indore 400/220 MPPTCL 315 Feb-11 15 Chakan (2nd ICT) 400/220 MSETCL 315 Jun-10 16 Kalwa(3x167) 400/220 MSETCL 500 Jan-11 17 Varsana (2x315 MVA) 400/220 GETCO 315 Nov-10 18 Kosamba 400/220 GETCO 315 Mar-11 19 Talaguppa (3rd) 400/220 KPTCL 315 Dec-10 20 Mahaboobnagar(2nd Trans.) 400/220 APTRANSCO 315 May-10 21 Chittoor (2nd Trans.) 400/220 APTRANSCO 315 May-10 22 Malkaram(1st Trf.) 400/220 APTRANSCO 315 Jun-10 23 Malkaram(2nd Trf.) 400/220 APTRANSCO 315 Aug-10 24 Mahaboobnagar(3rd Trans.) 400/220 APTRANSCO 315 Aug-10¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 861 TOTAL (State Sector) 8690 400kV (substation) (PS) 1 Pirana (2x315 MVA) 400/132 Torrent Power 630 Mar-11 Ltd TOTAL (Private Sector) 630 TOTAL(All India) 400kV (substation) 13970 Sl. No. Name of the Sub-station Voltage Executing Capacity Month of Ratio Agency completion (kV/kV) (MW/MVA) 220kV (substation) (CS) 1 Pithoragarh (1st ) 220/132 POWERGRID 100 Aug-10 2 Pithoragarh (2nd) 220/132 POWERGRID 100 Nov-10 3 Baripada 220/132 POWERGRID 160 Mar-11 4 Barjora S/S (2x150) 220/132 DVC 300 Jun-10 TOTAL (Central Sector) 660 220kV (substation) (SS) 1 Kirori(1st Trans.) 220/132 HVPNL 100 May-10 2 Bastra 220/132 HVPNL 200 Sep-10 3 Kirori(2nd Trans.) 220/132 HVPNL 100 Sep-10 4 Rewari (Aug.) (100-50) 220/132 HVPNL 50 Oct-10 5 Jind (Aug.) 220/132 HVPNL 100 Nov-10 6 Smalkha (2x100) 220/132 HVPNL 200 Feb-11 7 Sampla 220/132 HVPNL 200 Mar-11 8 Bagru 220/132 RRVPNL 100 May-10 9 Boranada I/A 220/132 RRVPNL 100 Jun-10 10 Nokha 220/132 RRVPNL 100 Nov-10 11 Chirawa (1x100) 220/132 RRVPNL 100 Nov-10 12 Jaipur( Indira Gandhi Nagar) GSS(1x100) 220/132 RRVPNL 100 Dec-10 13 MIA (up-grade) 220/132 RRVPNL 100 Mar-11 14 Sawa (upgrade) 220/132 RRVPNL 100 Mar-11 15 Dholpur (100-50) 220/132 RRVPNL 50 Mar-11 16 Reengus (Sikar) (100-50) 220/132 RRVPNL 50 Mar-11 17 Phalodi (Jodhpur) (100-50) 220/132 RRVPNL 50 Mar-11 18 Dhorimana (Barmer) (Aug.) 220/132 RRVPNL 100 Mar-11 19 Mandawar (Dausa) (Aug.) 220/132 RRVPNL 100 Mar-11 20 Bhilwara (Aug.) 220/132 RRVPNL 100 Mar-11 21 Banswara (Aug.) 220/132 RRVPNL 100 Mar-11 22 Bharatpur) (Aug.) 220/132 RRVPNL 100 Mar-11 23 Modak (Kota) (100-50) 220/132 RRVPNL 50 Mar-11 24 Balotra (Barmer) (100-50) 220/132 RRVPNL 50 Mar-11 25 Phulera (Jaipur) (100-50) 220/132 RRVPNL 50 Mar-11 26 Kishangarh (Ajmer) (Aug.) 220/132 RRVPNL 100 Mar-11 27 Hindaun (Karauli) (Aug.) 220/132 RRVPNL 50 Mar-11 28 Gulabpura (Bhilwara) (Aug.) 220/132 RRVPNL 100 Mar-11 29 Kankroli (Rajsamand) (Aug.) 220/132 RRVPNL 100 Mar-11 30 Amarsagar (Jaisalmer) (Aug.) 220/132 RRVPNL 100 Mar-11 31 Kukas (Jaipur) (Aug.) 220/132 RRVPNL 100 Mar-11 32 Chirawa (Jhunjhnu)(Aug.) 220/132 RRVPNL 100 Mar-11 33 Dhod (Sikar)(Aug.) 220/132 RRVPNL 100 Mar-11 34 Sambhal, Muradabad 220/132 UPPTCL 200 Jun-10 35 Gajraula 220/132 UPPTCL 200 Jun-10 36 Dadri 220/132 UPPTCL 200 Nov-10 37 Etah 220/132 UPPTCL 100 Dec-10 38 Nanauta (160+100) 220/132 UPPTCL 160 Jan-11 39 Naubasta (160-100) 220/132 UPPTCL 60 Mar-11 40 Sahupuri (160-100) 220/132 UPPTCL 60 Mar-11 41 Badaun(160-100) 220/132 UPPTCL 60 Mar-11862 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 42 Shatabdinagar (160-100) 220/132 UPPTCL 60 Mar-11 43 Panki (160-100) 220/132 UPPTCL 60 Mar-11 44 Jahangirabad (160-100) 220/132 UPPTCL 60 Mar-11 45 Azamgarh (160-100) 220/132 UPPTCL 60 Mar-11 46 Atrauli (160-100) 220/132 UPPTCL 60 Mar-11 47 Deirua (100) 220/132 UPPTCL 100 Mar-11 48 Sahupuri (160-100) 220/132 UPPTCL 60 Mar-11 49 Loni (150-100) 220/132 UPPTCL 50 Mar-11 50 Hardoi Road, Lucknow (160-100) 220/132 UPPTCL 60 Mar-11 51 Khurja (160-100) 220/132 UPPTCL 60 Mar-11 52 Gonda (160-100) 220/132 UPPTCL 60 Mar-11 53 Sikandra, Agra (60) 220/33 UPPTCL 60 Mar-11 54 Badaun (150-100) 220/132 UPPTCL 50 Mar-11 55 Shamshabad Road, Agra 220/132 UPPTCL 320 Mar-11 56 Gorakhpur II 220/132 UPPTCL 160 Mar-11 57 Pong (Aug) (40-20 ) 220/66 HPSEBL 20 Mar-11 58 Jassure S/S 1x25 MVA 220/33 HPSEBL 25 Mar-11 59 Uperla Nangal (Nalagarh) 220/66 HPSEBL 200 Mar-11 60 Amloh Road Mandi Govind Garh 220/66 PSTCL 100 Jun-10 61 Himatpura 220/66 PSTCL 100 Jul-10 62 Verpal Aug.(100-50) 220/66 PSTCL 50 Jul-10 63 Sadiq (U/G) (1x100 MVA) 220/66 PSTCL 100 Aug-10 64 Kharar 220/66 PSTCL 100 Aug-10 65 Taran Taran 220/66 PSTCL 100 Aug-10 66 Civil Lines ASR 220/66 PSTCL 100 Aug-10 67 Sunam 220/66 PSTCL 100 Aug-10 68 Pakhowal (new) (1x100 MVA) 220/66 PSTCL 100 Nov-10 69 F P Nabha (1x100) 220/66 PSTCL 100 Dec-10 70 Sahnewal (3rd Trf.) 220/66 PSTCL 100 Dec-10 71 Kohara (Aug) (1x100 MVA) 220/66 PSTCL 100 Jan-11 72 Algun 220/66 PSTCL 100 Mar-11 73 Jhuneer 220/66 PSTCL 100 Mar-11 74 Ghubaya (Addi.) 220/66 PSTCL 100 Mar-11 75 Baja Khana (Addi.) 220/66 PSTCL 100 Mar-11 76 Malerkotla (Addi.) 220/66 PSTCL 100 Mar-11 77 Malout (New) 220/66 PSTCL 100 Mar-11 78 Kartarpur 220/132 PSTCL 100 Mar-11 79 Botianwala 220/66 PSTCL 100 Mar-11 80 Ridge Valley 220/66 DTL 320 Sep-10 81 DIAL 220/66 DTL 320 Sep-10 82 Vasant Kunj (3rd) 220/66 DTL 160 Nov-10 83 Shalimar Bagh (3rd) 220/33 DTL 100 Mar-11 84 Masjid-Moth (Sirifort) 220/33 DTL 200 Mar-11 85 Mundka ( 1st Trf.) 220/66 DTL 160 Mar-11 86 Lakhani (Agathala)(1st Trf.) 220/66 GETCO 100 Apr-10 87 Botad 220/66 GETCO 50 Apr-10 88 Bhat (Bavla) 220/66 GETCO 100 May-10 89 Lakhani (Agathala) (2nd Trf.) 220/66 GETCO 100 Nov-10 90 Kangasiyalli 220/66 GETCO 100 Mar-11 91 Bhat (Bavla) (2nd Trf.) 220/66 GETCO 100 Mar-11 92 Botad (2nd Trf.) 220/66 GETCO 150 Mar-11 93 Jambuva (Aug.) 220/132 GETCO 50 Mar-11 94 Chhatral (Aug.) 220/66 GETCO 50 Mar-11 95 Kapadwanj (Aug.) 220/66 GETCO 50 Mar-11 96 Anjar (Aug.) 220/66 GETCO 100 Mar-11 97 Mehsana (Aug.) 220/66 GETCO 50 Mar-11 98 Doma 220/132 CSPTCL 160 Sep-10 99 Main step down GIS sub-station (MSDS)-5 220/132 CSPTCL 320 Mar-11 100 Paraswani (Mahassamund) (addti.) 220/132 CSPTCL 160 Mar-11 101 Mopka (addti) 220/132 CSPTCL 160 Mar-11¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 863 102 Chhatarpur 220/132 MPPTCL 160 Apr-10 103 Chhegaon 220/132 MPPTCL 160 Aug-10 104 Astha 220/132 MPPTCL 100 Sep-10 105 Kotar 220/132 MPPTCL 160 Nov-10 106 Betul 220/132 MPPTCL 160 Nov-10 107 Vidisha 220/132 MPPTCL 160 Jan-11 108 Wani (2x50) 220/33 MSETCL 100 Jul-10 109 Chakan 220/22 MSETCL 50 Aug-10 110 Shendra 220/33 MSETCL 100 Dec-10 111 Temghar 220/22 MSETCL 50 Dec-10 112 Hingoli 220/132 MSETCL 100 Mar-11 113 Hingoli (2x25) 220/33 MSETCL 50 Mar-11 114 Chakan (2x50) 220/22 MSETCL 100 Mar-11 115 Talegoan (2x50) 220/33 MSETCL 100 Mar-11 116 Kadegaon (Wani) 220/132 MSETCL 100 Mar-11 117 Parchur 220/132 APTRANSCO 100 Jun-10 118 Salivagu 220/11 APTRANSCO 100 Sep-10 119 Brahmanakotkur (2x25) 220/11 APTRANSCO 25 Jan-11 120 Malyala (4x31.5) 220/11 APTRANSCO 31.5 Feb-11 121 Brandix (2x100) 220/132 APTRANSCO 200 Mar-11 122 Regulapadu 220/11 APTRANSCO 25 Mar-11 123 Thudiyalur (Addl.Trans.) 230/110 Tantransco 80 Jun-10 124 KITS Park 230/110 Tantransco 80 Sep-10 125 Basin Bridge (Addl.Trans.) 230/110 Tantransco 100 Sep-10 126 Amuthapuram (Addl.Trf.) 230/33 Tantransco 50 Jan-11 127 Kodikurichi (Addl.Trf.) 230/110 Tantransco 100 Jan-11 128 Hosur (Addl.Trf.) 230/110 Tantransco 100 Jan-11 129 Alagarkoil (Addl.Trf.) 230/110 Tantransco 100 Mar-11 130 Kundra (2nd Trans.) 220/110 KSEB 200 Nov-10 131 Pothencode (3rd Trf.) 220/110 KSEB 200 Mar-11 132 MK Hubli 220/110 KPTCL 100 Dec-10 133 Ghataprabha (1st Trf.) 220/110 KPTCL 100 Dec-10 134 A' Station compound (Anand Rao circle) 220/66 KPTCL 150 Dec-10 135 Ramanagar (Kothipura) 220/66 KPTCL 100 Dec-10 136 Nimhans 220/66 KPTCL 300 Dec-10 137 Vajamangala 220/66 KPTCL 150 Dec-10 138 East Division Compound 220/66 KPTCL 300 Dec-10 139 Ghataprabha (2nd Trans.) 220/110 KPTCL 100 Mar-11 140 Kushalanagara 220/66 KPTCL 100 Mar-11 141 Bolangir (2x100) 220/132 OPTCL 100 Aug-10 142 Bolangir (2nd Trf.) 220/132 OPTCL 100 Mar-11 143 Subhasgram 220/132 WBSETCL 160 Aug-10 144 Singur (2x160) 220/132 WBSETCL 160 Sep-10 145 Subhasgram (2nd) 220/132 WBSETCL 160 Nov-10 146 Singur (2x160) 220/132 WBSETCL 160 Nov-10 147 Kolkata Leather Complex 220/132 WBSETCL 160 Nov-10 148 Asansol (Aug. ) 220/132 WBSETCL 100 Nov-10 149 Khagaul (Patna) (Aug.) 220/132 BSEB 100 Nov-10 150 Bodhgaya (Aug.) 220/132 BSEB 150 Nov-10 151 Bidanasi 220/33 OPTCL 40 Jan-11 152 Byrnihat (2x160) 220/132 MeSEB 320 Aug-10 TOTAL (State Sector) 220 17027 TOTAL (All India) 220 17687 Total (All India) (400 +220) kV 31657864 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Annex 6.5 TRANSMISSION SYSTEM ADDITION DURING 2011-12 Transmission lines commissioned during 2011-12 As on 31.03.2012 Sl. Name of Transmission Lines No. of ckts. Executing Line No. Agency Length (CKM) I. 765 KV LINES CENTRAL SECTOR 1 LILO of Tehri - Meerut at Tehri Pooling Point (to be charged at 400 kV) 2xD/C PGCIL 13 2 Gaya –Balia ( Part Line) S/C PGCIL 69 3 Satna - Bina line -I S/C PGCIL 274 4 2nd S/C Seoni (PG)–Wardha (PG) line (initially to be operated at S/C PGCIL 261 400 kV) 5 Balia-Lucknow S/C PGCIL 320 6 Gaya - Balia (Balance Part) S/C PGCIL 159 7 Bina - Indore S/C PGCIL 311 8 Gaya - Sasaram S/C PGCIL 148 9 LILO of Sipat - Seoni at WR pooling point (Bilaspur poolng point) S/C PGCIL 8 10 LILO of Sipat - Seoni at WR pooling point (Bilaspur poolng point) (2nd S/C PGCIL 8 Ckt) 11 Sasaram - Fatehpur line-I S/C PGCIL 337 TOTAL CKM OF FULLY COMPLETED (CS) DURING THE YEAR 1908 STATE SECTOR 1 Shiffting of 765 kV Anpara- Unnao at Unnao S/C UPPTCL 1 2 Shifting of Anpara B-Unnao termination point from Anpara B to Anpara S/C UPPTCL 1 C sw. yard. Total of STATE Sector 2 TOTAL 765 kV lines (ALL INDIA) 1910 Name of Transmission Lines No. of Circits Name of Line Utility Length (CKM) HVDC BIPOLE +/- 500 kV Mundra -Mohindergarh Bipole Bipole Adani 1980 Total (HVDC) 1980 Sl. Name of Transmission Lines No. of ckts. Executing Line No. Agency Length (CKM) II. 400 kV lines CENTRAL SECTOR 1 Koderma-Biharshariff (Quad) D/C PGCIL 222 2 Korba STPS- Raipur D/C PGCIL 424 3 LILO of 400 kV D/C Gazuwaka - Vemagiri at Simhadri TPS D/C PGCIL 22 4 Mysore - Hassan D/C PGCIL 192 5 Rourkela - Raigarh D/C PGCIL 420 6 LILO of Alamathy - Sriperumbdur at Vallure TPS D/C on M/C PGCIL 131 7 Wardha (PG)-Parli (PG) D/C PGCIL 674 8 Baripada - Mendhasal D/C PGCIL 546 9 Farakka - Kahalgaon (2nd line) D/C PGCIL 190¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 865 10 LILO of Bawana/Bahadurgarh -Hissar line at Bhiwani D/C PGCIL 27 11 LILO of Jind ckt. of Nalagarh-Kaithal at Patiala D/C PGCIL 22 12 LILO of Patiala - Hissar at Kaithal D/C PGCIL 66 13 Mundra - Bachchau D/C PGCIL 198 14 URI I - URI II S/C PGCIL 11 15 Bachchau - Ranchodpura D/C PGCIL 566 16 Patiala - Ludhiana D/C PGCIL 156 17 Korba (NTPC)-Brisinghpur (MPGENCO) (Portion of line 8 Ckm D/C PGCIL 8 commissioned for contingency arrangement) 18 Mejia-Maithon D/C PGCIL 114 19 Mundra -Limbdi ( part Line) S/C PGCIL 384 20 Muvattupuzha (PG) - North Trichur (PG) D/C PGCIL 157 20 Bhiwadi - Neemrana D/C PGCIL 97 21 LILO of Allahabad - Kanpur at Fatehpur D/C PGCIL 31 22 Lucknow (New) - Lucknow line - II (Quad) D/C PGCIL 6 23 Maithon (RB) - Ranchi D/C PGCIL 376 24 URI II -Wagoora S/C PGCIL 105 25 Biharshariff - Sasaram (Ckt-I & Part of Ckt-II) D/C PGCIL 318 26 LILO of Singrauli - Kanpur at Fatehpur D/C PGCIL 41 27 Neemrana - Sikar D/C PGCIL 352 28 Tuticorin JV - Madurai D/C PGCIL 304 29 Durgapur - Maithon line D/C PGCIL 146 30 Korba (NTPC) – Birsinghpur (MPGENCO) (Balance Part) D/C PGCIL 446 31 LILO of Both Ckt of Lucknow - Bareliiy line (PG) at Shahjahanpur D/C PGCIL 32 32 LILO of Both Ckt of Nathpa Jhakri - Abdullapur (Tripal Snowbard) at D/C PGCIL 102 Panchkula 33 Mundra - Limbdi D/C PGCIL 244 34 Biharshariff - Sasaram (Remaninig Part of Ckt-II) D/C PGCIL 80 35 Indore - Indore (MPPTL) D/C PGCIL 50 36 Kalpakkam - Arni D/C PGCIL 213 37 LILO of Nelmangala - Somanhalli at Bidadi D/C PGCIL 28 38 LILO of Udumalpet - Trichur at Palakkad D/C PGCIL 49 39 LILO of both ckt Vindhyachal -Jabalpur at Sasan 2xD/C PGCIL 13 40 Mauda STPS - Wardha line (Quad)(Ckt-1) D/C PGCIL 124 Total 400 kV (PG) 7687 Total 400 kV DVC 0 Total of CENTRAL Sector (400 kV) 7687 STATE SECTOR 1 Sagardighi - Parulia (PGCIL) S/C on D/C WBSETCL 255 2 Vadinar (Essar)-Hadala D/C GETCO 226 3 LILO of Sriperumbudur- Puduchery at Sunguvarchatram 400kV S/S D/C TANTRANSCO 16 4 LILO of Hissar- Fatehabad at Nuhiawali D/C HVPNL 153 5 LILO of Jhajjar (APCPL) - Daultabad line at MG Jhajjar (CLP) D/C HVPNL 10 6 Jaisalmer- Jodhpur S/C RVPNL 239 7 Bhusaval - II - Aurangabad D/C MSETCL 185 8 New Bhusaval - Aurangabad D/C MSETCL 179 9 LILO of Asoj - Ukai at Kosamba D/C GETCO 64 10 Jhajjar -Dhanonda D/C HVPNL 40 11 Jhajjar - Kabulpur D/C HVPNL 70 12 Kabulpur-Deepalpur D/C HVPNL 133 13 LILO of abdullapur-Bawana at deepalpur D/C HVPNL 2 14 BTPS- Hiriyur D/C KPTCL 313 Total of STATE Sector (400 kV) 1885 PRIVATE SECTOR 1 LILO of Lonikhand (MSETCL) - Kalwa (MSETCL) at Pune (PG) D/C RPTL 3 2 Limdi (Chorania (GETCO)- Ramchodpura (Vadavi) (GETCO) D/C RPTL 206 3 Jaigad - Karad. D/C JPTL 219 4 LILO of Korba - Bhatapara at Kasaipalli D/C ACB 6 5 Parli (PG) - Solapur (PG) D/C RPTL 272 6 Ranchodpura (Vadavi) (GETCO)- Zerda ( Kansari (GETCO) D/C RPTL 282866 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 7 LILO of Korba - Brisinghpur at Balco TPS D/C BALCO 35 8 LILO of Madurai - NLC at Energen TPP D/C CGPL 52 9 LILO of Viindhyachal -Korba line at Mahan S/S D/C ESSAR 44 10 Meenakshi-Nellore S/C MEL 26 11 Simhapuri-Meenakshi D/C MEL 2 12 Simhapuri-Nellore S/C MEL 26 13 LILO of (PGCIL) Lucknow - Bafreilly at Shahjahanpur D/C RPTL 29 14 LILO of (Reliance) of Lucknow - Bareilly at Shahjahanpur D/C RPTL 15 Total of PVT Sector (400 kV) 1217 Total 400 kV Lines (All India) 10789 Sl. Name of Transmission Lines No. of ckts. Executing Line No. Agency Length (CKM) III. 220 kV CENTRAL SECTOR 1 Chamera-III - Pooling Station Near Chamera-II HEP D/C PGCIL 30 2 Kalpakkam PFBR-Sirucheri D/C PGCIL 72 3 LILO of 220 kV D/C Fatehpur (UPPCL) - Kanpur (UPPCL) line at D/C PGCIL 23 Fatehpur. 4 LILO of 1st Ckt Dehri - Bodhgaya line at Gaya. D/C PGCIL 24 5 LILO of 1st Ckt Sikar (RVPN), Ratnagarh at Sikar D/C PGCIL 6 6 LILO of Dehri - Bodhgaya line at Gaya D/C PGCIL 24 Total PGCIL 179 Total CKM OF 220 kV LINES (DVC) 0 Total CKM OF 220 kV LINES (CS) 179 STATE SECTOR 1 Mohana-Smalkha line D/C HVPNL 55 2 Dewas - Astha D/C MPPTCL 144 3 LILO of Bhosari - Chinchwad line at Chakan S/S D/C on M/C MSETCL 17 4 LILO of Bikaner-Sridungargarh line at Bikaner GSS S/C RVPNL 7 5 LILO of Chittorgarh - Nimbahera line at GSS Sawa. D/C RVPNL 5 6 LILO of Sirohi-Bhinmal at Bhinwal GSS (PG) D/C RVPNL 10 7 LILO of 2nd ckt of Ukai (T)-Vav at Bardoli (mota) D/C GETCO 10 8 LILO of 1 Ckt of Bina - Shivpuri at Bina 765 KV New S/S (PG) D/C MPPTCL 2 9 LILO of Mohali-Dera Bassi at Lalru S/C PSTCL 34 10 LILO of Sunam - Mansa line at Jhunir D/C PSTCL 68 11 Devakkurichi- Pudhanchandai S/C on D/C TANTRANSCO 84 12 LILO of Thiruvarur- Karaikudi at Karambayam(Nimmeli Thippiakudi) D/C TANTRANSCO 17 13 Othakkalmandapam (Malumichampatty)- Palladam S/C TANTRANSCO 53 14 LILO of Fatehpur - Panki at Kanpur South D/C UPPTCL 7 15 Lakkasagaram - Nansuralla D/C APTRANSCO 7 16 Bhat - Pirana line D/C GETCO 29 17 Chormar-Rania line via Nuhianwali D/C HVPNL 73 18 LILO of Dadri -Rewari at Lula Ahir D/C HVPNL 9 19 Sewah-Chhajpur line D/C HVPNL 27 20 Smalkha- Chhajpur D/C HVPNL 50 21 Barn-Bishnah-Hira Nagar D/C JKPDD 180 22 LILO of Lonikhanda - Khadki line at VSNL S/S D/C MSETCL 4 23 LILO of Parvati - Phursungi line at Jejuri S/S D/C MSETCL 62 24 LILO on Parli (Murud) - Solapur line at Tuljapur D/C MSETCL 6 25 Focal Point Nabha- Phagan Majra 400kV S/S D/C PSTCL 33 26 Akal - Bhu line D/C RVPNL 17 27 LILO of Chekknurani - Amathapuram at Nallamanaickenpatty D/C TANTRANSCO 30 28 Greater Noida-Noida Sector 129 D/C UPPTCL 24 29 LILO of panki-Uanno at Bithoor S/C UPPTCL 14¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 867 30 Kathalguri-Tinsukia (2nd Circuit) S/C AEGCL 24 31 Ramagundam- Bellampalli S/C on D/C APTRANSCO 37 32 Kosamba-Zagadia line D/C GETCO 49 33 LILO of Gondal-Rajkot line at Kangasiyali D/C GETCO 28 34 Kashang-Bhaba( 1st Ckt.) D/C HPSEBL 37 35 Lula Ahir-Dhanonda line S/C HVPNL 40 36 LILO of Karad – Kolhapur D/C at Wather D/C MSETCL 20 37 Talegaon 400 kV(PG)S/S – Talegaon 220 kV S/S D/C MSETCL 20 38 LILO one ckt of Laiton Kalan-Dhandari at Ludhiana D/C PSTCL 5 39 Patti-Algaon line S/C on D/C PSTCL 20 40 LILO of both ckts of Gooty - Somayajulapally at Dhone sw.stn. 2xD/C APTRANSCO 114 41 Vijayawada TPS-Tallapally D/C APTRANSCO 266 42 LILO of Padghe-Kalwa at Temghar D/C MSETCL 3 43 Bhadra- Chirawa S/C RVPNL 109 44 Bhinmal (PG) -Sanchore (RVPN) and Bhinmal (PG)-Bhinmal (RVPN) S/C RVPNL 18 45 Chhabra TPS-Jhalawar S/C RVPNL 101 46 Hazaira (GSEC)-Kosamba D/C GETCO 125 47 Fatehabad-Chormar line D/C HVPNL 158 48 Humnabad - Halbaraga D/C KPTCL 79 49 LILO of Shimoga - Mysore at Chikk Magalur D/C KPTCL 57 50 Volkswagen-M/s. Mahindra S/S S/C MSETCL 3 51 Palamaneru - Chitoor S/C on D/C APTRANSCO 58 52 Nyara - Tebhda (Ckt-I) S/C GETCO 90 53 Dhanonda - Dadhi Bana line D/C HVPNL 34 54 Dechu - Tinwari S/C RVPNL 71 55 Sunguvarchatram- Oragadam S/C on D/C TANTRANSCO 10 56 Dhone - Krishnagiri S/C on D/C APTRANSCO 11 57 LILO of Gooty - Alipura at Regulapadu (balance work) D/C APTRANSCO 22 58 East Div Comp. - HAl in Bangalore. UG Cable KPTCL 8 59 RTPS-Raichur D/C KPTCL 35 60 Bhusaval - II - Amalner D/C MSETCL 197 61 Bhilangana III - Ghansali (Guttu) D/C PTCUL 38 62 Matre (PG) - Nehtaur S/C UPPTCL 75 63 LILO of Bahadurgarh -Rohtak line at Sampla D/C HVPNL 48 64 daultabad-Mau D/C HVPNL 76 65 Akola - Balapur line D/C MSETCL 54 66 Babhleshwar - Chalisgaon (upto kopergaon tap point.) D/C MSETCL 74 67 Bambhori - Amalner line S/C MSETCL 38 68 Deepnagar - Bambhori line S/C MSETCL 70 69 LILO of Kolhapur - Phonda at Hamidwada D/C MSETCL 4 70 LILO of Mulund - Borivali at Bhandup UG Cable MSETCL 2 71 LILO of Pedhambe - Kharepatan at Niwali line S/C MSETCL 33 72 LILO of Pedhambe - Kharepatan at Oni line S/C MSETCL 1 73 MIDC Chandrapur S/S - M/s GEPL (ckt-I) S/C MSETCL 12 74 Kalpaka S/S - Ms. Brandix (Balance Part) D/C APTRANSCO 19 75 Maharani Bagh - Trauma Centre/AIIMS (UG cable) D/C DTL 19 76 Bhutiya-Kheralu line D/C GETCO 99 77 Wagra - RVNL line D/C GETCO 18 78 LILO of Satna (PGCIL) - Katni at Maihar D/C MPPTCL 4 79 Phursungi-Jejuri line D/C MSETCL 60 80 Bhiwadi (PGCIL) - Neemrana (Remaining Portion) S/C RVPNL 6 81 Charanka - Jangral line D/C GETCO 32 82 LILO of Jetpur-Keshod line at Shapur D/C GETCO 3 83 LILO of Kaithal -Narwana at batta D/C HVPNL 4 84 LILO of Pali - Gurgaon Sector-52 A at Gurgaon Sector-56 D/C HVPNL 1 85 Narendra 400kV S/S- Mahalingapur D/C KPTCL 246 86 Maheshwar - Pithampur D/C MPPTCL 115 87 Osmanabad - Barshi (2nd Ckt) S/C MSETCL 44868 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 88 South solapur (PG) - South solapur D/C MSETCL 6 89 LILO of Jamsher - Mahilpur at Rehana Jattan D/C PSTCL 10 90 LILO of Bhiwadi - Alwar line at Kishangarh S/C RVPNL 5 91 Padampur - Udyogvihar S/C RVPNL 42 92 MTPS Stage III -Pallakkapalayam S/C TANTRANSCO 6 93 MTPS Stage-III - Gobi S/C TANTRANSCO 3 94 Burla - Bolangir, (2nd Ckt) S/C OPTCL 118 95 Chincholi (PGCIL) - Solapur D/C MSETCL 5 96 Chitegaon- Shendra D/C MSETCL 57 97 Chulliar (Mannukad) - Palakkad D/C KSEB 8 98 Greater Noida-IT City Garbara S/C UPPTCL 11 99 Jabalpur - Jabalpur D/C MPPTCL 12 100 Khaperkheda TPS - Khaperkheda (Existing) 2xD/C MSETCL 12 101 Kirori-Samain line D/C HVPNL 68 102 LILO of Fatuha- Khagaul at Sipara(New) D/C BSEB 19 103 LILO of Arasur - Ingur at Karamadai D/C TANTRANSCO 6 104 LILO of Bassi - Kukas at (GIS) Kunda ki Dhani D/C RVPNL 8 105 LILO of Chandrapur GCR - Chandrapur MIDC at Tadali D/C MSETCL 2 106 LILO of Debari - Banswara at Aspur D/C RVPNL 2 107 LILO of Dhangadhra - Lalpar at Halvad D/C GETCO 4 108 LILO of Dhrangadhra-Morbi line at Lalpar D/C GETCO 13 109 LILO of Savarkundla - Mahva(otha) at Pipavav (GPPC) (line-1) D/C GETCO 91 110 LILO of Savarkundla - Ultratech (Old) at loc 30 of Savarkundla - Mahuva D/C GETCO 16 111 Laltonkalan - Sahnewal (one ckt) D/C PSTCL 7 112 Link line between Patna (PG) - Sipara(BSEB) D/C BSEB 1 113 Maharani bagh - HC Mathur Lane (Electric Lane) D/C DTL 17 114 Maharani bagh - Masjidmoth D/C DTL 18 115 Malakaram - Gunrock DC UG cable APTRANSCO 32 116 Malwa TPP - Chhegaon D/C MPPTCL 95 117 Nyara - Tevda (2nd Ckt ) S/C GETCO 90 118 Parichha - Banda S/C UPPTCL 210 119 Raj West-Dhorimana S/C RVPNL 83 120 Roja - Badaun (2nd Ckt) S/C UPPTCL 96 121 Sankhari -Jangral line D/C GETCO 65 122 Sarnath (400) - Birapatti S/C UPPTCL 23 123 Varahi - Khemar (Part line) D/C KPTCL 150 Total CKM OF 220 kV LINES (SS ) 5534 Private Sector 1 LILO of Allain Duhangan- Nalagarh at Chhaur D/C EPCL 2 2 Budhil -Chamera III D/C LEPP 40 Total CKM oF 220 kV LINES (PS ) 42 Total of STATE Sector 3452 Total of 220 kV (ALL INDIA) 5755 Total ALL INDIA (765+400+220 kV) 20434¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 869 Sub-stations commissioned during 2011-12 As on 31.03.2012 Sl. Name of Sub-Station Voltage Executing Capacity Month of No. Ratio Agency (MW/MVA) Completion (kV/kV) 765 kV CENTRAL SECTOR 1 Balia (New) (1st Trf) 765/400 PGCIL 1500 DEC-11 2 Lucknow (New) (1st Trf) 765/400 PGCIL 1500 DEC-11 3 Balia S/S (2nd Trf.) 765/400 PGCIL 1500 Feb-12 4 Lucknow (2nd Trf) 765/400 PGCIL 1500 Feb-12 5 Wardha 765/400 PGCIL 3000 Feb-12 6 Fatehpur 765/400 PGCIL 3000 Mar-12 7 Gaya 765/400 PGCIL 3000 Mar-12 8 WR Pooling Station near Sipat 765/400 PGCIL 3000 Mar-12 9 Wardha 3rdTrf 765/400 PGCIL 1500 Mar-12 TOTAL (Central Sector) 19500 State Sector 1 Unnao 765/400 UPPTCL 1000 Mar-12 TOTAL (State Sector) 1000 Total ALL INDIA (765kV SS) 20500 Sl. Name of Sub-Station Voltage Executing Capacity Month of No. Ratio Agency (MW/MVA) Completion (kV/kV) 400 kV CENTRAL SECTOR 1 Raipur Extn. 400/220 PGCIL 315 JUN-11 2 Shujalpur (1st ICT) 400/220 PGCIL 315 JUN-11 3 Extn.Patiala 400/220 PGCIL 500 JUL-11 4 Bachchau S/S 400/220 PGCIL 630 AUG-11 5 GIS Pooling Station near Chamera-II HEP 400/220 PGCIL 630 AUG-11 6 Extn. Bahadurgarh 400/220 PGCIL 500 OCT-11 7 Pune Extn. 400/220 PGCIL 315 OCT-11 8 Muvattapuzha s/s (2 nd ICT) 400/220 PGCIL 315 NOV-11 9 Shujalpur(2nd ICT) 400/220 PGCIL 315 NOV-11 10 Fatehpur Extn. 400/220 PGCIL 630 DEC-11 11 Neemrana (1st Trf.) 400/220 PGCIL 315 DEC-11 12 Wardha Extn. 400/220 PGCIL 500 DEC-11 13 Gaya Extn. 400/220 PGCIL 815 Jan-12 14 Gurgaon GIS S/Stn. (2nd ICT) 400/220 PGCIL 315 Jan-12 15 Lucknow Extn. 400/220 PGCIL 500 Jan-12 16 Sikar 400/220 PGCIL 315 Jan-12 17 Chulliar 400/220 PGCIL 315 Feb-12 18 Panchkula 400/220 PGCIL 630 Feb-12 19 Bhiwadi Extn. 400/220 PGCIL 315 Mar-12 20 Bidadi (GIS) S/S 400/220 PGCIL 500 Mar-12 21 Chulliar (2nd Trf.) 400/220 PGCIL 315 Mar-12 22 Neemrana (2nd Trf.) 400/220 PGCIL 500 Mar-12 23 Sikar (2nd ICT) 400/220 PGCIL 315 Mar-12 24 Silchar (New) 400/220 PGCIL 400 Mar-12 Total PGCIL 10515 Total DVC 0 Total of CENTRAL Sector (400 kV SS) 10515870 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] STATE SECTOR 1 Bhusaval (ICT-I) S/S 400/220 MSETCL 500 AUG-11 2 Sunguvarchatram 400/220 TANTRANSCO 630 AUG-11 3 Bhusaval (ICT –II) S/S 400/220 MSETCL 500 SEP-11 4 Babhaleshwar S/S 400/220 MSETCL 500 DEC-11 5 Dhule S/S 400/220 MSETCL 500 DEC-11 6 Khaperkheda S/S (2x500) 400/220 MSETCL 1000 DEC-11 7 Nagothane S/S 400/220 MSETCL 500 DEC-11 8 Dinod (Kosamba)(2nd Trf.) 400/220 GETCO 315 Jan-12 9 Nuhiyawali (1st Trf) 400/220 HVPNL 315 Jan-12 10 Deepalpur S/S 400/220 HVPNL 630 Feb-12 11 Kabulpur S/S 400/220 HVPNL 630 Feb-12 12 Nuhiyawani (2nd & 3rd ICT) 400/220 HVPNL 630 Feb-12 Total of STATE Sector 6650 TOTAL 400 kV (PS) 0 Total ALL INDIA (400 kV SS) 17165 Sl. Name of Sub-Station Voltage Executing Capacity Month of No. Ratio Agency (MW/MVA) Completion (kV/kV) 220 kV CENTRAL SECTOR 1 Dhanbad (2x80) 220/33 DVC 80 JUN-11 2 Raebareli (POWERGRID) 220/132 PGCIL 100 SEP-11 3 Koderma (2x150) 220/132 DVC 320 Mar-12 4 Koderma (2x80) 220/33 DVC 160 Mar-12 Total of CENTRAL Sector 660 STATE SECTOR 1 Brahmanakotkur 220/11 APTRANSCO 25 Apr-11 2 Malyala 220/11 APTRANSCO 95 Apr-11 3 Sadayapalayam 230/33 TanTransco 100 Apr-11 4 Oragadom 230/110 TanTransco 100 Apr-11 5 Alundur (Addl Trf.) 230/110 TanTransco 100 Apr-11 6 Ponda 220/110 Ele. Deptt. Goa 100 May-11 7 Xeldem 220/110 Ele. Deptt. Goa 100 May-11 8 Kushalanagara (2nd Trf.) 220/66 KPTCL 100 May-11 9 Vasai 220/100 MSETCL 100 May-11 10 Jath (2x100) (1st Trf.) 220/132 MSETCL 100 May-11 11 Urse 220/22 MSETCL 50 May-11 12 Kanpur South (3x60) (Ist Trf.) 220/132 UPPTCL 60 May-11 13 Amulhapuram (Add.Tr.) 230/33 TANTRANSCO 50 Jun-11 14 A'station Compound (Anand Rao Circle) (2nd Trf.) 220/66 KPTCL 150 Jun-11 15 Vadavi (Aug.) 220/66 GETCO 50 Jun-11 16 Nakhatrana (Aug.) 220/66 GETCO 50 Jun-11 17 Achchalia (Aug.) 220/66 GETCO 50 Jun-11 18 Khassa (Aug.) 220/66 PSTCL 100 Jun-11 19 Gurgoan Sector-72 220/33 HVPNL 100 Jul-11 20 Malerkotla (Aug.) 220/66 PSTCL 100 Jul-11 21 Focal Point Nabha (2nd Trf.) 220/66 PSTCL 100 Jul-11 22 Bithoor 220/132 UPPTCL 160 Jul-11 23 Bishnah 220/132 J&K 320 Jul-11 24 Kangasiyali 220/66 GETCO 100 Jul-11 25 Kotmikala (Addl.) 220/132 CSPTCL 100 Jul-11 26 Vasai (2nd Trf.) 220/100 MSETCL 100 Jul-11 27 Bellampally (Mandamarri) 220/132 APTRANSCO 100 Jul-11 28 Rishra(aug.) 220/132 WBSETCL 160 Jul-11 29 Lalru 220/66 PSTCL 100 Aug-11¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 871 30 Kapurthala (Kanjli) (New) 220/66 PSTCL 100 Aug-11 31 Algaon 220/66 PSTCL 100 Aug-11 32 Bemetara(Add.) 220/132 CSPTCL 160 Aug-11 33 Deodor (Aug.) 220/66 GETCO 50 Sep-11 34 Dhasa (Aug.) 220/66 GETCO 50 Sep-11 35 Hadala (Aug.) 220/66 GETCO 100 Sep-11 36 Jangrol (Aug.) 220/66 GETCO 100 Sep-11 37 Waghodid (Aug.) 220/66 GETCO 100 Sep-11 38 Bithoor (2nd Trf.) 220/132 UPPTCL 160 Sep-11 39 Dalkhola 220/132 WBSETCL 320 Sep-11 40 Palamaneru 220/132 APTRANSCO 100 Oct-11 41 Chhajpur S/S 220/132 HVPNL 200 Oct-11 42 Chormar S/S (1st Trf) 220/132 HVPNL 100 Oct-11 43 Chormar S/S (2nd Trf) 220/33 HVPNL 100 Oct-11 44 Dharuhera (Mau) S/S (1st Trf) 220/66 HVPNL 200 Oct-11 45 Dharuhera (Mau) S/S (2nd Trf) 220/33 HVPNL 100 Oct-11 46 Lula Ahir 220/33 HVPNL 100 Oct-11 47 Ashta (Add.) Trf. S/S 220/132 MPPTCL 160 Oct-11 48 Butari (Aug) S/S 220/66 PSTCL 100 Oct-11 49 Sanchore (1x100) 220/132 RRVPNL 100 Oct-11 50 Mosur III Auto (Add. Trf) 220/110 TANTRANSCO 100 Oct-11 51 Sadayampalayam (Add. Trf) 220/33 TANTRANSCO 50 Oct-11 52 Kambalapadu 220/11 APTRANSCO 75 Nov-11 53 Regulapadu S/S 220/11 APTRANSCO 50 Nov-11 54 Dhanonda 220/132 HVPNL 100 Nov-11 55 Chikkmagalur S/S 220/66 KPTCL 200 Nov-11 56 Badnera (Aug.) S/S 220/33 MSETCL 25 Dec-11 57 Balapur S/S 220/33 MSETCL 25 Dec-11 58 Bambhori (Jalgaon) S/S 220/132 MSETCL 200 Dec-11 59 Bambhori S/S 220/132 MSETCL 25 Dec-11 60 Baramati (Aug.) S/S 220/33 MSETCL 25 Dec-11 61 Baramati (Aug.) S/S 220/132 MSETCL 50 Dec-11 62 Bhandup GIS S/S 220/22 MSETCL 200 Dec-11 63 Chikhali (Aug.) S/S 220/132 MSETCL 100 Dec-11 64 Hamidwada S/S 220/33 MSETCL 50 Dec-11 65 Hinjewadi S/S 220/22 MSETCL 50 Dec-11 66 IMT Manesar (Aug.) 220/66 HVPNL 100 Dec-11 67 Jath S/S 220/33 MSETCL 50 Dec-11 68 Kadegaon S/S 220/132 MSETCL 100 Dec-11 69 Kadegaon S/S 220/33 MSETCL 100 Dec-11 70 Kandalgaon S/S 220/22 MSETCL 50 Dec-11 71 Kangasiyali (2nd Trf.) 220/66 GETCO 100 Dec-11 72 Krishnagiri 220/11 APTRANSCO 75 Dec-11 73 Kurkumbh S/S 220/132 MSETCL 200 Dec-11 74 Lakkasagaram 220/11 APTRANSCO 75 Dec-11 75 Lalpar 220/132 GETCO 200 Dec-11 76 M.K. Hubli (2 nd Trf) 220/110 KPTCL 100 Dec-11 77 Miraj (Aug.) S/S 220/132 MSETCL 100 Dec-11 78 Niwali S/S 220/132 MSETCL 100 Dec-11 79 Paradeep (Aug.) S/S 220/132 OPTCL 110 Dec-11 80 Parbhani (Aug.) S/S 220/132 MSETCL 100 Dec-11 81 Pusad (Aug.) S/S 220/33 MSETCL 25 Dec-11 82 Sawangi S/S 220/132 MSETCL 100 Dec-11 83 Settipally 220/11 APTRANSCO 75 Dec-11 84 Solapur (Aug.) S/S 220/132 MSETCL 50 Dec-11 85 Tuljapur S/S 220/33 MSETCL 100 Dec-11 86 VSNL - Yewalewadi S/S 220/22 MSETCL 50 Dec-11872 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 87 Warora (Aug.) (IInd) S/S 220/33 MSETCL 25 Dec-11 88 Warora (Aug.) S/S 220/33 MSETCL 25 Dec-11 89 Amargarh S/S 220/132 JKPDD 160 Jan-12 90 Amritsar S/S 220/66 PSTCL 100 Jan-12 91 Aurangabad Ring Main 220/33 MSETCL 100 Jan-12 92 Balapur (2nd Trf) 220/33 MSETCL 25 Jan-12 93 Balapur S/S 220/132 MSETCL 200 Jan-12 94 Batta S/S (1st Trf.) 220/132 HVPNL 100 Jan-12 95 Batta S/S (2nd Trf.) 220/33 HVPNL 100 Jan-12 96 Bhutiya (Aug.) 220/66 GETCO 50 Jan-12 97 Bidri (25 MVA) 220/33 MSETCL 50 Jan-12 98 Bidri S/S 220/132 MSETCL 100 Jan-12 99 Bongaigaon TPS SS (Aug.) 220/132 AEGCL 80 Jan-12 100 Budgam 220/132 JKPDD 320 Jan-12 101 Chandrapura(Aug.) 220/66 GETCO 50 Jan-12 102 Dasuya ( Addl. T/F) S/S 220/66 PSTCL 100 Jan-12 103 Dhuri (Addl)(3rd T/F) S/S 220/66 PSTCL 100 Jan-12 104 Ferozepur Road Ludhiana (1x100 MVA) 220/66 PSTCL 100 Jan-12 105 Gorakpur II (2nd trf.) 220/132 UPPTCL 160 Jan-12 106 Mahuakhedaganj 220/132 PTCUL 200 Jan-12 107 Mandi Govindgarh 220/66 PSTCL 100 Jan-12 108 Mirbazar 220/132 JKPDD 320 Jan-12 109 Nansuralla 220/11 APTRANSCO 75 Jan-12 110 Nuhiawali 220/132 HVPNL 100 Jan-12 111 Nuna Majra (Aug.) S/S 220/132 HVPNL 100 Jan-12 112 Patran 220/66 PSTCL 100 Jan-12 113 Ramban (3x40) 220/132 JKPDD 120 Jan-12 114 Rothak (Aug.) S/S 220/132 HVPNL 100 Jan-12 115 Sagapara (Aug.) 220/66 GETCO 50 Jan-12 116 Trauma Centre / AIIMS (GIS) 220/33 DTL 200 Jan-12 117 A-5 Faridabad. S/S 220/66 HVPNL 100 Feb-12 118 Deepalpur S/S 220/132 HVPNL 200 Feb-12 119 Kabulpur S/S 220/132 HVPNL 200 Feb-12 120 Masudpur 220/132 HVPNL 100 Feb-12 121 Mohana 220/132 HVPNL 100 Feb-12 122 Barshi S/S 220/132 MSETCL 200 Feb-12 123 Flagship (Hinjewadi) S/S 220/22 MSETCL 50 Feb-12 124 Tuljapur S/S 220/132 MSETCL 200 Feb-12 125 Chola Sahib S/S 220/66 PSTCL 100 Feb-12 126 Doraha 220/66 PSTCL 100 Feb-12 127 Kotla Jangan (Addl) 220/66 PSTCL 100 Feb-12 128 Rehana Jattan 220/66 PSTCL 100 Feb-12 129 Kishangarhbas S/s 220/132 RVPNL 100 Feb-12 130 (Dighi) Yewalewadi S/S 220/22 MSETCL 50 Mar-12 131 Bhokardhan 220/33 MSETCL 50 Mar-12 132 Bhokardhan. S/S 220/132 MSETCL 200 Mar-12 133 Gajokhar 220/132 UPPTCL 100 Mar-12 134 Himmatpura (Addl 100 MVA T/F) 220/66 PSTCL 100 Mar-12 135 Jhansi 220/132 UPPTCL 100 Mar-12 136 Jhunsi 220/132 UPPTCL 160 Mar-12 137 Jurala 220/132 APTRANSCO 200 Mar-12 138 Kagal (Hamidwada) S/S 220/33 MSETCL 50 Mar-12 139 Mastewala 220/66 PSTCL 100 Mar-12 140 Mehal Kalan 220/66 PSTCL 100 Mar-12 141 Paranda 220/132 MSETCL 200 Mar-12 142 Patoda 220/33 MSETCL 100 Mar-12 143 Rashiana (Addl.) 220/66 PSTCL 100 Mar-12¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 873 144 Somanahalli (AddI.) 220/66 KPTCL 100 Mar-12 145 Tadali S/S 220/33 MSETCL 100 Mar-12 146 Thelkadih S/S 220/132 CSPTCL 160 Mar-12 147 Wadala (addl.) 220/66 PSTCL 100 Mar-12 TOTAL (State Sector) 220 15835 Private Sector 1 ChhaurS/S 220/132 EPCL 127 SEP-11 Total of 220 kV(ALL INDIA) 16622 Total ALL INDIA (765+400+220 kV) 54287 Annex-6.6 Details of transmission line projects (220 kV & above) under execution where major forest clearance problem were encountered by Implementing Agencies S. Name of the Project / Location Executing Brief history of issues with MOEF/State Government No. agencies 1. Parbati Pooling Station- Amritsar D/C PGCIL Total forest land 137.213 Ha, line (Himachal Pradesh) Proposal submitted in June 2010 RMoEF submitted inspection report in March 2012 and discussed in FAC meeting in April 2012.FRA compliance is under progress. Stage I clearance yet to be received 2. Shifting of Anpara - Unnao 765 kV S/C UPPTCL Total forest land 6.7 Ha(800m) trans. line from termination point at Proposal submitted in Aug 2010 Anpara B to Anpara C switchyard Stage I clearance received in May 2011 Stage II clearance received in Dec 2011 Line Commissioned in March 2012. 3. UPCL Nandikur - Hassan(Shantigram) KPTCL Total forest land 172.53 Ha(33.39 km) 400 kV D/C line Proposal submitted in March 2010 Stage I clearance received in Feb. 2011 Stage II clearance received in Feb.2012 & working under progress. 4. BTPS-Hiriyur 400 kV KPTCL Total forest land 14.34 Ha Line Proposal submitted in May, 2008. Forest dept. forwarded proposal in July 2010 Nodal officer submitted to MoEF in Jan 2011 Stage I clearance received in May 2011 Stage II clearance received in Jan.2012 Line Commissioned in March 2012. 5. Koldam-Ludhiana 400 kV line (HP & PKTCL Forest proposal submitted by PGCIL in May,05 Punjab) HP portion Stage-I clearance received in Mar 2010 Punjab Portion Stage-I clearance received in Feb 2010 PKTCL requested for change of name of user agency. Nodal officer, HP recommended the case to MoEF in July 2010 Matter is under consideration by MoEF. Stage II Clearance yet to be received. 6. Teesta-III-Mangan- TVPTL Total forest land 48.4484(Sikkim) +47.4932(WB) Kishenganj(Karandighi) 400 kV D/C line Forest proposal submitted in Aug 2009 (Quad moose) For Sikkim portion Stage I clearance received in Jan. 2011 Compliance report submitted in May 2011 Stage-II clearance received in Sept 2011 For West Bengal portion Forest proposal submitted in Aug 2009 Stage I clearance yet to be received State Govt. yet to forward proposal to MoEF 7. Mundra- Limbdi and Mundra-Jetpur PGCIL Total forest land (44.34 + 29.38 Ha)874 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Mundra-Ranchodpura Stage-1 clearance received in Oct2010/Jun2011 400KV D/C Line Compliance report submitted in Jan. 2011/ Stage-II clearance received in June/July 2011 (Gujarat) Mundra- Limbdi and Mundra -Ranchodpura line commissioned in Feb 2012 Mundra - Jetpur line is under progress. 8. Hindupur-Pulivendula 220 kV D/C line APTRANSCO Total forest land 6.79 Ha Forest proposal submitted in April 2008 Stage I clearance received in July 2008 Compliance report submitted in July 2009 Stage II clearance is awaited 9. Nellore – Palamaneru 220 kV D/C line APTRANSCO This line has been dropped 10. Pallatana – Bongaigaon 400 kV D/C line NETCL Total forest land (5680HCs) in 130 locs. Forest proposal submitted in April to Aug.2006 Tripura Stage I clearance received in Oct 2009 Stage II clearance received in Aug.2010. Assam Stage I clearance received in May 2010 compliance report submitted in Feb.2011 Stage II clearance received in May 2012 Meghalaya Stage I clearance received in Feb 2010. compliance report submitted in Feb.2011 Stage II clearance received in May 2012 11. Kameng-Balipara 400kV D/C line PGCIL Total forest land 98.25 Ha (Assam) Stage I clearance received in Jan 2010 compliance report submitted in July 2011 Stage II clearance yet to be received 12. Earth Electrode line for Biswanath PGCIL Total forest land 58.55 Ha Chariali Pooling Stn. & Earth Electrode Stage I clearance received in Nov 2009 Station at Thagiabari (Assam) compliance report submitted in July 2011 Stage II clearance yet to be received 13. Korba STPP – Birshinghpur PGCIL Total forest land 157.481 Ha 400 kV D/C line Stage I clearance received in July 2010 (Chhattisgarh) compliance report submitted in Nov 2010 Stage II clearance received in June 2011 Line Commissioned in Feb.2012. 14. Biharsharif – Koderma 400 kV D/C line PGCIL Total forest land 13.007 Ha (Bihar) Stage I clearance received in April 2010 compliance report submitted in Dec 2010 Stage II clearance received in Mar 2011 Line Commissioned in May2011. 15. Mysore – Kozikode 400 kV D/C line PGCIL Total forest land 23.166 Ha 23.166 Ha (Karnataka) Forest proposal submitted in April 2004 State Govt. submitted proposal in Oct. 2010 Stage I clearance yet to be received 16. Mohindergarh HVDC Station (Haryana) Adani Power Total forest land 0.8612 Ha Station Commissioned in Mar 2012. 17. Rourkela- Raigarh 400 KV D/C line PGCIL Total forest land 111.39 Ha. (Orissa) Stage I clearance received in Oct 2009 Stage II clearance yet to be received Line Commissioned in June 2011 on special permission from MoEF in July 2010 18. Chamera-III Pooling Stn.-Jallandhar 400 PGCIL Total forest land 130.698 Ha, KV D/C line Stage I clearance received in Sept 2010¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 875 (Himachal Pradesh) Compliance report submitted in Mar 2011 Stage II clearance yet to be received 19. Lower Subansiri-Biswanath Chariali PGCIL Total forest land 88.77 Ha 400KV D/C Line (Assam) Forest proposal submitted in Feb 2011 Stage I clearance yet to be received 20. Kameng – Balipara 400 kV D/C line PGCIL Total forest land 133.65 Ha, (Arunachal Pradesh) Stage I clearance received in Sept 2010 Compliance report submitted in Oct 2011 Work is in progress. 21. Raipur- Wardha 400 kV D/C line PGCIL Total forest land 15.37 Ha. (Chhattisgarh) Forest proposal submitted in May 2011 Stage I clearance received in April 2012 Work is in progress. 22. Krishnapatnam – Gooty and PGCIL Total forest land 42.067 Ha, Krishnapatnam - Kurnool 400KV D/C Forest proposal submitted in Nov 2010 lines (Andhra Pradesh) Stage I clearance received in Dec 2010 Compliance report submitted in Feb 2012. Stage II clearance yet to be received 23. Dhanbad-Giridih 220KV D/C line DVC Total forest land 42.243 Ha, Forest proposal submitted in Sept. 2006 Stage I clearance received in Jan 2009 Compliance report submitted in Aug 2011 Stage II clearance received in May 2012 Working clearance from forest dept. yet to be received 24. Mejia- Gola-Ramgarh 220 KV Line DVC Total forest land 90.543 Ha, Forest proposal submitted in Nov 2005 Stage I clearance received in April 2010 Compliance report submitted in Aug 2010 Stage II clearance yet to be received 25. Raghunathpur-Ranchi 400 kV line DVC Total forest land 61.352 Ha, Forest proposal submitted in Jan 2008 Stage I clearance received in Oct 2010 Compliance report submitted in Dec 2011 Stage II clearance yet to be received 26. Gola -Ranchi 220 kV D/C line DVC Total forest land 42.164 Ha, Forest proposal submitted in May 2008 Stage I clearance received in Nov 2010 Compliance report yet to be submitted 27. Sampla - Mohana HVPNL Total forest land 0.4919 Ha 220 kV D/C line Line Commissioned in Feb 2011. 28. Utran-Kosamba 220 kV line-II GETCO This line has been dropped 29. Malwa THP-Pithampur 400 kV D/C line MPPTCL Total forest land 5.755 kms Forest proposal submitted in Feb 2010 Stage I clearance received in Dec 2010 Compliance report submitted in Aug 2011 Stage II clearance received in Feb 2012. 30. Palamaneru - Chitoor 220 kV D/C line APTRANSCO Total forest land 22.03 Ha. Forest proposal submitted in Aug 2006 Stage I clearance received in July 2010 Compliance report submitted in Dec 2010 Stage II clearance received in Jan 2011 Line Commissioned in Oct 2011 31. Parbati-Koldam 400 kV line (Himachal PKTCL Forest proposal submitted in Nov 2006 Pradesh) Stage I clearance received in Dec 2007 Compliance report pending with the State Government 32. Vapi- Navi Mumbai 400 KV D/C line, PGCIL Total forest land 272.1195 Ha (Maharastra) Forest proposal submitted in May 2005 The forest proposals has been put up to National Board for Wild Life(NBWL) in Oct 2011 33. Baripada – Mendhasal 400 kV D/C line PGCIL Total forest land 21.36 Ha(0.55 Ha WL) (Orissa) Forest proposal submitted in Feb 2008876 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Stage I clearance received in May 2011 Compliance report submitted in Aug 2011 Stage II clearance received in Aug 2011 Line Commissioned in Aug 2011 34. Koderma-Giridih 220 kV line DVC Total forest land 86.085 Ha, Forest proposal submitted in Mar 2009 NO forwarded Proposal in Mar 2012 Stage I clearance received in May 2012 Compliance report yet to be submitted 35. Jhalawar - Kalisindh 220 kV D/C line RRVPNL Total forest land 4.4 Ha Forest proposal submitted in Mar 2010 Stage I clearance received in April 2011 Line Commissioned in April 2012. 36. LILO of Madri-Udaipur 220 kV line RRVPNL Total forest land 2.1 Ha Forest proposal submitted in May 2010 Stage I clearance yet to be received 37. Ranjit Sagar Dam – Sarna (Ckt.IV) 220 PSTCL This line has been dropped kV line 38. Loharinagpala-Koteshwaar 400 kV D/C PTCUL This line has been dropped line 39. Satpura – Ashta D/C 400 kV line MPPTCL Total forest land 106.15 Ha Forest proposal submitted in Dec 2010 Stage I clearance received in Jan 2012 Compliance report yet to be submitted 40. Wani - Warora 220 kV line MSETCL This line has been dropped 41. Chandrapur II- MIDC - Ballarshah 220 MSETCL This line has been dropped KV D/C line 42. Khaperkheda from exist loc. No. 6 of MSETCL Total forest land 0.7735 Ha Koradi – Chandrapur 400 kV S/C line Stage I clearance received in Jan 2012 Stage II clearance yet to be received 43. Jeur – Paranda 220 kV D/C line MSETCL This line has been dropped 44. Trans. Line Lamboti (Solapur) – Taljapur MSETCL Total forest land 63.24 Ha 220 kV D/C line Forest proposal submitted in Feb 2009 Stage I clearance yet to be received 45. Parli III-Nanded 220 kV D/C line MSETCL This line has been dropped 46. Rajgarh(PG)-Karamsad(GETCO) RPTL Total forest land 39.14 Ha 400 KV D/C line Forest proposal submitted in Dec 2009 State Govt yet to forward proposal to MoEF 47. LILO of Tarapur – Boriwali 220 kV D/C MSETCL Total forest land 0.498 Ha at Boisar Forest proposal submitted in Aug 2008 Stage I clearance yet to be received 48. Boisar- Boriwali 220 kV D/C MSETCL Total forest land 198.71 (117.29+81.42) Ha Forest proposal submitted in Aug 2010 Stage I clearance received in Dec 2011 Compliance report submitted in July 2012 Stage II clearance yet to be received 49. Boriwali- Kalwa 220 kV D/C line MSTCL -do- 50. Kalwa-Kharghar 220 kV D/C line MSTCL -do- 51. Removing earth and rock beneath 220 KSEB Forest proposal submitted in July 2010 kV Sabarigiri-Theni feeder between Stage I clearance yet to be received location 50 and 51 to maintain statutory clearance 52. Mankulam HEP - Valara pooling station KSEB Forest proposal submitted in Aug 2010 220 kV line Stage I clearance yet to be received¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 877 53. Lohardagga-Latehar 220 kV D/C line JSEB Total forest land 11.5611 Ha Forest proposal submitted in July 2010 Stage I clearance yet to be received 54. Latehar – Daltonganj 220 kV D/C line JSEB Total forest land 57.04 Ha Forest proposal submitted in Aug 2010 Stage I clearance yet to be received 55. Tiroda - Warora (MSETCL) 400 kV ADANI POWER Total forest land 27.308 Ha D/C (Quad) line Forest proposal submitted in May 2011 Stage I clearance received in Jan 2012 Compliance report submitted in Feb 2012 Stage II clearance yet to be received 56. Mundra – Mahindergarh ±500 kV HVDC ADANI POWER Total forest land 55.58 line Forest proposal submitted in May 2011 Stage I clearance received in Oct. 2011 Line Completed in March 2012 57. Korba- Bishrampur 220 kV D/C CSPTCL Total forest land 195.296 Ha Forest proposal submitted in July 2006 Stage I clearance received in March 2009 Compliance report submitted in May 2011 Stage II clearance received in Aug 2011 58. Bongaigaon (PG) – Siliguri (PG) 400 kV ENICL Total forest land 8.5 Ha D/C line Forest proposal submitted in Jan 2011 Stage I clearance yet to be received 59. Bilaspur Pooling Station – Ranchi PGCIL Total forest land 302.368 Ha 765kV S/C Line (Chhattisgarh) Forest proposal submitted in Mar 2011 Stage I clearance yet to be received 60. Silchar – Melriat (New) 400 KV D/C line PGCIL Total forest land 375.66 Ha (Charged at 132 KV) (Mizorma) Forest proposal submitted in Sept. 2011 Stage I clearance yet to be received 61. Sasan- Satna 765 KV S/C line (ckt.I) PGCIL Total forest land 114.724 Ha. (Madhya Pradesh) Forest proposal submitted in May 2011 Stage I clearance yet to be received 62. Parbati Pooling Stn.– Amritsar line PGCIL Total forest land 61.65 Ha. 400kV D/C (Punjab) Stage I clearance received in April 2010 Compliance report submitted in Oct 2011 Stage II clearance yet to be received 63. Bokaro-Kodarma 400 KV D/C Line PGCIL Total forest land 198.59 Ha (Jharkhand) Forest proposal submitted in May 2011 Stage I clearance yet to be received 64. Satpura (Sarni)-Pandhurna 220 kV MPPTCL Total forest land 38.90 Ha Line(2nd circuit) Forest proposal submitted in Feb. 2011 Stage I clearance received in Sept. 2011 Compliance report submitted in Mar 2012 Stage II clearance received in June2012 Annex- 6.7 SCHEMES UNDER EXECUTION DURING 11TH PLAN (Associated with Generation Projects and ISTS System Strengthening Schemes) Sl. Name of the Sub-station Voltage Executing Capacity Status No. Ratio Agency (kV/kV) (MW/MVA) I. 500 kV HVDC(Sub-station) 1 Converter station at Balia & PGCIL 1250 WIP Bhiwadi (2x1250 MW) – 2nd Pole 2. Converter station at Mundra & Adani 2500 WIP Mohindergarh (2x1250 MW) –878 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] System Strengthening Schemes in NR: Scheme Description Status Table No: NR-IS-01/Ch.-6 NR System 1. Gurgaon (PG Sec 72) – Manesar 400 kV Severe ROW problem. Strengthening D/c(Quad) Scheme-XIII 2. Establishment of 400/220kV substation Engg.& Survey in progress with 2x500 MVA transformation capacity at Manesar 3. Delinking Agra-Samaypur and WIP Samaypur-Gurgaon (PG Sec-72) 400 kV lines from Samaypur and making a direct line from Agra to Gurgaon (PG Sec-72) 400 kV S/c circuit 4. 2 nos. of 220 kV bays at Fatehabad 400/220 kV substation. 5. 125 MVAR Bus Reactor at Manesar Table no: NR-IS-02/Ch.-6 NR System 1. LILO of Nallagarh-Kaithal 400 kV circuit Commissioned 8/11. Strengthening (Triple Snowbird second ckt of Scheme-XIV Nalagarh-Hissar 400 kV D/c line) at Patiala (first ckt is already LILOed) 2 Additional 500 MVA 400/220 kV ICT at Commissioned Patiala having ( 2x315 MVA) capacity 3. Additional 500 MVA 400/220 kV ICT at commissioned Malerkotla having (2x315 MVA) capacity 4. 125 MVAR Bus Reactor at Patiala commissioned Table no: NR-IS-03/Ch.-6 NR System 1. Manesar - Neemrana 400 kV D/c WIP Strengthening 2. Bhiwadi - Neemrana 400 kV D/c Stringing commenced from March '11. Scheme-XV 3. LILO of Bhiwadi – Jaipur 400 kV S/c to Engg. & Survey in progress establish new 400/220 kV S/s at Kotputli. 4 Establishment of 400/220kV substation commissioned with 2x315 MVA transformation capacity at Neemrana 5. Establishment of 400/220kV substation WIP with 2x315 MVA transformation capacity at Kotputli Table no: NR-IS-04/Ch.-6 NR System 1. LILO of both circuits of Kishenpur – WIP Strengthening Wagoora 400 kV D/c to create new 400/220 Scheme-XVI kV S/s at New Wanpoh 2. Kishenpur – New Wanpoh 400 kV D/c WIP 3. Establishment of 400/220kV substation with WIP 2x315 MVA transformation capacity at New Wanpoh Table no: NR-IS-05/Ch.-6 NR System Neemrana – Sikar 400kV D/C Line completed Strengthening Scheme-XVII Table no: NR-IS-06/Ch.-6 NR System 1. Baghpat – Dehradun 400 kV D/c (Quad) Completion matching with Bagpat & Strengthening Deharadun S/Stn. (land yet to be Scheme-XVIII handed-over). 2. Establishment of 400/220kV substation WIP with 2x315 MVA transformation capacity at Dehradun¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 879 Generation projects located in Himachal Pradesh: Generation Project Description Status Table no: NR-HP-01/Ch.-6 Chamera III HEP 1. Pooling Station near Chamera-III Forest stage -II approval pending. (NHPC) ( 3x77 MW) HEP - Jullandur line 400kV D/C Compl. Matching with Chamera Gen. Proj. (slipped to 12th Plan) 2. Chamera-III-Chamera pooling station commissioned 8/11. near Chamera II HEP 3. GIS Pooling Station near Chamera-II commissioned 8/11. HEP Table no: NR-HP-02/Ch.-6 Parbati - III HEP 1 . L I L O of 400kV D/C Parbati -II - Forest approval pending (Clubbed with (4x130 MW) Koldam/Nalagarh at Parbati Pooling parbati-III - Amritsar line) (slipped to 12th Plan) Point Amritsar 2. LILO of 400kV D/C Parbati -II - Tower erection commenced. Parbati Pooling Point at Parbati -III 3. Parbati Pooling Point - Amritsar Forest case (HP portion) forward to 400kV D/C with 80 MVAR reactor MOEF N. Delhi in Jun'10. Re-routing of line is done avoiding wild life centuary area. St-II clearance awaited 4. Establshment of 400KV Parbati Pooling station (GIS) Table no: NR-HP-03/Ch.-6 Karcham Wangtoo 1. Karcham Wangtoo-Abdullapur Under costruction by JV co. HEP (4x250 400kV D/C MW) 2. Abdullapur – Sonepat 400kV D/C Commissioned 3/11. (commissioned) Table no: NR-HP-04/Ch.-6 Budhil HEP (LANCO Budhil- Chamera-III 220kV S/C commissioned Green) HP(2x35 MW) (slipped to 12th Plan) Table no: NR-HP-05/Ch.-6 Malana II HEP (EPPL) 1. Malana II HEP - Chhaur 132kV D/C Stringing Completed. (2x50 MW) 2. LILO of Allain Duhangan -Nalagarh stringing completed. at Chhaur 220kV D/C (commissioned) 3. 220/132kV Chhaur S/S Ready for commissioning. Generation projects located in Jammu & Kashmir: Generation Project Description Status Table no: NR-JK-01/Ch.-6 Uri - II HEP URI I - URI II 400kV S/C Line ready for charging. Readiness of (NHPC) 4x60 MW bays being constructed by NHPC awaited for commissioning. URI II -Wagoora 400kV S/C Work seriously hampered due to law & (slipped to 12th Plan) order problem& frequent snowfall in last two months. Table no: NR-JK-02/Ch.-6 Chutak NHPC(4x11 System available at 66 kV level. MW) (slipped to 12th Plan)880 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Table no: NR-JK-03/Ch.-6 Nimoo Bazgo System available at 66 kV level. (NHPC)(3x15MW) (slipped to 12th Plan) Generation projects located in Uttrakhand: Generation Description Status Project Table no: NR-UK-01/Ch.-6 Koteshwar 1. Koteshwar -Tehri Pooling Point Ckt-1 Test charged on 23.02.11 & Ckt-II (commissioned) D/C test charged on march '11. 2. LILO of Tehri - Meerut at Tehri LILO of Ckt-I completed & test charged on Pooling Point (to be charged at 400 21.01.11 & Ckt-II test charged on 6/11. KV) 3. 50% compensation of Tehri – Meerut line 4. Establishment of Tehri Pooling station(GIS) Generation projects located in Delhi: Generation Description Status Project Table no: NR-DL-01/Ch.-6 Pragati CCGT ph- Splitting of Existing 400kV Bawana Bus Work by DTL III (PPCL) 400 kV Swichyard Bus to be extended (4x250+2x250)MW to split Bus (slipped to 12th Plan) Table no: NR-DL-02/Ch.-6 Rithala CCPP System at 66 kV( By NDPL) (NDPL) (GT+ ST 108 MW) (commissioned) Generation projects located in Haryana: Generation Description Status Project NR-HR-01/Ch.-6 Jhajjar-I (Indira 1. Jhajjar-Daulatabad 400kV D/C ckt 1 commissioned. 2nd ckt commissioned Gandhi) TPS Feb’11 (3x500 MW) 2 . J h a j ja r -Mundka (Delhi) 400kV D/C 1st ckt commissioned 9/10& 2nd ckt in 11/10 (U-1,U-2 3. Jhajjar (TPS) -Dhanonda 400kV WIP. commissioned, U- D/C 3 slipped to 12th 4. Daultabad (3x315) 400/220 kV S/S 1st & 2nd Transformer test charged 11/10 Plan) and 3rd Transformer test charged 12/10 5. Mundka (2x315) 400/220 kV S/S 1st Trans.Commissioned 9/10 and 2nd Trans.Commissioned 3/11. 6. Mundka (2x160) 400/220 kV S/S Ready for commissioning.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 881 NR-HR-02/Ch.-6 Jhajjar-I (Mahatma 1. RGEC-Sonipat(Deelapur)220kV Gandhi) TPS D/C (2x660 MW) 2 . D e e la p ur –HSIDC 220kV D/C Work awarded 3. Deelapur –Barhi 220kV D/C Work not awarded ( U-I 4. Deelapur –Tajpur 220kV D/C commissioned, 5. Deelapur –Barhi 220kV D/C U-2 slipped to 6. Jhajjar (TPS) -Dhanonda 400kV commissioned 12th Plan) D/C 7. Jhajjar -Kabulpur 400kV D/C commissioned 8. Kabulur- Deelapur 400kV D/C commissioned 9. LILO of 400kV Jhajjar(APCPL)- commissioned Dauktabad line at Jhajjar TPS 10. Deelapur 400/220 kV and commissioned 220/132kV S/S 11. Kabulpur 400/220 kV and commissioned 220/132kV S/S Generation projects located in Rajasthan: Generation Description Status Project Table no: NR-RJ-01/Ch.-6 Jallipa Kapurdi 1. Rajwest- Jodhpur 400kV D/C Commissioned 5/10 TPP(8x135 MW) 2. Raj West-Barmer 400kV D/C 1 ckt Commissioned 5/10& 2nd ckt in 3/11 (Raj West Power) 3. Raj West-Dhorimanna 400kV D/C Commissioned 3/12 (Unit 1to 4 4. LILO of Giral -Barmer ckt 1 at RAJ Commissioned 8/08 commissioned in West LTPS D/C 11th plan) Generation projects located in Uttar Pradesh: Generation Project Description Status Table no: NR-UP-01/Ch.-6 Anpara ' C' (LANCO 1. Extn.of 400 kV Bus from Anpara B Work completed 6/10 ANPARA to Anpara C PPL(2x600 MW ) 2. Shifting of 765kV Anpara B- Unnao Line charged termination point from Anpara B to (commissioned) Anpara C sw.yard 3. Shifting of 765kV Anpara –Unnao at commissioned Unnao 4. Unnao 765/400 kV S/S commissioned Table no: NR-UP-02/Ch.-6 Harduaganj TPS U- Harduaganj - Jahangirabad 220kV D/C Existing system adequate for U-8 & U-9. 8 & 9 (2x250MW) Construction work started (U-8 commissioned, U-9 slipped to 12th Plan) Table no: NR-UP-03/Ch.-6 Parichha TPS Extn. 1. Parichha - Orai 400 kV D/C Work in progress (UPRVUNL) 2x250 2. Orai - Mainpuri 400 kV D/C Work in progress MW 3. Mainpuri (765 kV)- Mainpuri Proposed under PPP mode (slipped to 12th (PGCIL) 400 kV D/C Plan) 4. LILO of Agra- Agra (PGCIL) at Mainpuri 400 kV D/C 5. Parichha - Bhauti Commissioned882 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 6. Parichha - Banda Part I 220 kV S/C Work in progress 7. Parichha - Banda Part II 220 kV S/C Completed. 8. Mainpuri 765/400 kV S/S Proposed under PPP mode 9. Orai 400/220 kV S/S Table no: NR-UP-04/Ch.-6 Rosa St II (2x300 1. LILO of (PGCIL) Lucknow–Bareilly commissioned MW) 400kV line at Shahjahanpur (Private Sector) 2. LILO of (Reliance) Lucknow– commissioned Bareilly 400kV line at Shahjahanpur (commissioned) 3. Rosa- Dohna 220kV line S/c on D/c Work in progress System Strengthening Schemes in WR: Scheme Description Status Table no: WR-IS-01/Ch.-6 Western Region SET-A : For absorbing import in eastern Strengthening and central part of WR Scheme - II Wardha (PG)–Parli (PG) 400kV D/C Commissioned 7/11. Raipur(PG)–Wardha(PG) 400kV D/C Work affected due to ROW problem in line & delayed forest clearance. Bhadravati(PG)-Parli(PG) 400kV D/C Line charged in March'11. 2nd S/C Seoni (PG)–Wardha (PG) line commissioned. (initially to be operated at 400kV) Parli (MSETCL) – Parli (PG) 400kV D/C Line completed SET–D: For Regional Strengthening in Northern Madhya Pradesh 1. Korba (NTPC) – Birsinghpur line commissioned (MPGENCO) 400kV D/C 2. Birsinghpur (MPGENCO) – Damoh Line completed & commissioned 400kV D/C 3. Damoh – Bhopal 400kV D/c line commissioned 4. Bina – Gwalior 765kV 2nd S/C Commissioned line(op. at 400kV) Table no: WR-IS-02/Ch.-6 Western Region LILO of 765kV S/C Sipat - Seoni line at commissioned Strengthening WR Pooling station Near Sipat Scheme – X Table no: WR-IS-03/Ch.-6 Western Region LILO of 765kV Sipat - Seoni (2nd Ckt) commissioned Strengthening at WR Pooling station Near Sipat Scheme - XI 1x500MVA, 3rd transformer at WR Pooling point Generation projects located in Gujarat: Generation Description Status Project Table no: WR-GJ-01/Ch.-6 Hazira TPP Hazaira (GSEC)- Kosamba 220kV D/C commissioned (GSECL) 351 MW Hazaira (GSEC)- Mota 220kV D/C line WIP (commissioned)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 883 Table no: WR-GJ-02/Ch.-6 Mundra TPP Ph.II 1. Mundra(Adani) -Zerda 400kV line 2 WIP (2x660 MW) 2. Mundra(Adani) –Zerda 400kV line 1 WIP (commissioned) Table no: WR-GJ-03/Ch.-6 Mundra TPP Ph.III 1. Mundra (Adani )-Mohindergarh commissioned 3x 660 MW(Adani HVDC (± 500kV) Power), 2. Mohindergarh HVDC - Stringing completed. (commissioned) Mohindergarh HVPNL (Dhanonda) 400kV 3. Mohindergarh HVDC – Bhiwani Stringing completed. 400kV 4. Dhanonda- Daultabad (Quad) WIP 400kV 5. LILO of Dhanonda-Daultabad at 0 Manesar 400kV 6. Dhanoda(Mohindergarh) 400/220kV commissioned 7. Aurangabad(PG)- Aurangabad (MSETCL) Table No : WR-GJ-04/Ch.-6 Surat Lignite Ext Mangrol-Mobha 220kV D/C line (2nd commissioned (250MW) ckt) (State Sector) (commissioned) Table no: WR-GJ-05/Ch.-6 Essar Power 1. EPGL TPS – Bachau 400kV D/C WIP Saliya (2x600MW) (Triple) along with 1x125MVAR bus (Private Sector) reactor at generation switchyard 2. (Vadinar)EPGL TPS-Hadala 400kV Commissioned (U-1 D/C line commissioned) 3. (Vadinar)EPGL TPS-Amreli 400kV WIP D/C line Generation projects located in Maharashtra: Generation Description Status Project Table no: WR-MH-01/Ch.-6 Bhusaval TPP 1. New Bhusaval - Aurangabad Commissioned (MSPGCL) 2x500 400kV D/C MW 2. Bhusaval - II - Aurangabad 400kV Commissioned D/C 3. Bhusaval - II - existing Khadka Commissioned 4/10 (commissioned) 400kV D/C 4. Bhusaval - II - Amalner 220kV D/C Commissioned 5. 400/220 kV new Bhusaval S/S - Commissioned existing 400 kV Khadka D/C on M/C 6. Bhusaval – II 400/220 kV S/S Commissioned Table no: WR-MH-02/Ch.-6 Khaperkheda TPS 1. Khaperkheda TPS - Koradi 400kV Work in progress (MSPGCL) S/C (1x500MW) 2. LILO of Koradi- Chandrapura at Commissioned 11/09 Khaperkheda TPS 400kV D/C (commissioned) 3. Khaperkheda TPS - Khaperkheda commissioned (Existing) 220kV 2xD/C 4. Khaperkheda S/S (2x500 MVA) commissioned884 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Table no: WR-MH-03/Ch.-6 JSW Energy 1. Jaigad - New Koyna 400kV D/C ckt 1 commissioned 7/10 & ckt 2 ( Ratanagiri Ltd) , commissioned 8/10. 4x300 MW 2. Jaigad - Karad 400kV D/C commissioned (commissioned) Table no: WR-MH-04/Ch.-6 Mihan TPP LILO of 220kV Wardha-1 to Ambazari commissioned (Abhijeet Energy) S/C line (4x50MW) (commissioned) Generation projects located in Madhya Pradesh: Generation Description Status Project Table no: WR-MP-01/Ch.-6 Maheshwar HEP 1. Maheshwar - Nimrani 220kV D/C Commissioned 5/10 (10x40 MW) 2. Maheshwar - Pithampur 220kV D/C WIP. Final forest clearence obtained. (slipped to 12th 3. Maheshwar - Rajgarh 220kV D/C Work deferred Plan) Generation projects located in Chhatisgarh: Generation Description Status Project Table no: WR-CG-01/Ch.-6 Sipat-I 1. Sipat-Seoni Line-1 commissioned (3x660MW) 1. Sipat-Seoni Line-2 commissioned (Central sector) 2. Seoni-Khandwa 400 kV D/C commissioned (U-1 &2 (Quad AAAC) commissioned) 2. LILO of one ckt of Korba STPS- commissioned Raipur at Sipat 400 kV D/C 3. LILO of Bhilai-Satpura S/C line at commissioned Seoni 400 kV D/C 4. Nagda-Dehgam 400 kV D/C commissioned 5. LILO of both ckt of S.Sarovar- commissioned Nagda D/C at Rajgarh 400 kV 2XD/C 6. Seoni S/S 765/400 kV ( 7x500 commissioned single phase units) 7. Seoni 400/220 kV 2x315 MVA S/S commissioned 8. Rajgarh 400/220 kV 2x315 MVA commissioned S/S Table no: WR-CG-02/Ch.-6 S V Power TPP LILO of 220kV Kobra – Mopaka line at Commissioned (commissioned) S V Power Table no: WR-CG-03/Ch.-6 Kasaipalli TPP 3. Kasaipalli- Sipat(Bharai) Pooling Stringing completed (2x135MW) Station 400kV D/c 4. LILO of Kobra –Bhatapara at Commissioned (interim arrangement) (U -1 Kasaipalli commissioned)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 885 System Strengthening Schemes in SR: Scheme Description Status Table no: SR-IS-01/Ch.-6 SRSSS -IX Mysore – Hassan 400kV D/C line Commissioned 6/11. Table no: SR-IS-02/Ch.-6 SRSSS -X LILO of both ckt of 400kV Neelmangla – Stringing commenced Somanahalli at Bidadi Table no: SR-IS-03/Ch.-6 SRSSS -XI LILO of both ckt of 400kV Udumalpet - commissioned Madakathara at Chulliar Generation projects located in Andhra Pradesh: Generation Project Description Status Table no: SR-AP-01/Ch.-6 Simhadri TPS St- II LILO of 400 kV D/C Gazuwaka - commissioned 7/11. (NTPC) Vemagiri at Simhadri St II TPS D/C (2x500 MW) (commissioned) Table no: SR-AP-02/Ch.-6 Nagarjuna Sagar TR Rentachintala 220/132kV S/S Commissioned 11/08 HEP(2x25 MW) LILO of VTS -Tallapally 132kV D/C Commissioned 11/08 (slipped to 12th Plan) line- Rentachintala Rentachintala -Macherla S/S132kV WIP Rentachintala -Nagarjuna Sagar WIP Plant 132kV Table no: SR-AP-03/Ch.-6 Priyadarshani-Jurala Jurala HEP-Veltoor 220kV D/C Commissioned HEP(6x39 MW) (commissioned) Table no: SR-AP-04/Ch.-6 Kakatiya(Bhoopalapally) Bhoopalapally -Warangal 400kV D/C Commissioned 2/10 TPP-St-I & II(1x500 + Bhoopalapally -Gajwel 400kV D/C Work in progress 1x600MW) (State Sector) (U-1 commissioned) Table no: SR-AP-05/Ch.-6 Kothagudam TPS ST-VI Kothagundam TPS - Khammam Commissioned 3/11 (500 MW ) 400kV D/C (commissioned) Generation projects located in Karnataka: Generation Description Status Project Table no: SR-KA-01/Ch.-6 Udupi TPS 1. UTPS- Hassan(Shantigrama) WIP.ROW& Court case. (UPCL), 400kV D/C Forest(172.53hec.) & railway clearance (2x600MW) (6loc.) required, Stage I clearance recd. (commissioned) CA charges deposited. 2. UTPS-Nandikur - Khemar 220kV Commissioned 10/09. (For start up power) (partly on Multi-ckt Multi-Voltage towers & partly on D/C towers)886 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Table no: SR-KA-02/Ch.-6 Torangallu Jindal 1. Torangallu JSW -Gooty 400kV D/C U-1,2(2x300MW) line (Private Sector) 2. LILO of RTPS- Guttur at Thorangallu Commissioned (commissioned) JSW S/S Table no: SR-KA-03/Ch.-6 Bellary TPP 1. LILO of RTPS-Guttur at BTPS Commissioned (2x500MW) 400kV D/C (commissioned) 2. BTPS-Hirriyur 400kV D/C Commissioned 3. LILO Lingapur-Alipur at BTPS Table no: SR-KA-04/Ch.-6 Kaiga APP U-3,4 1. Mysore – Kozikode 400kV D/C RoW problem (2x250MW) 2. Narendra – Davengiri 400kV D/C Commissioned (commissioned) line 3. Hiriyur 400/220kV S/S Commissioned 4. Kozikode Ext. 400/220kV S/S Completion matching with line Generation projects located in Tamil Nadu: Generation Description Status Project Table no: SR-TN-01/Ch.-6 Vallur TPS JV 1. Vallur JV Project-NCTPS St.II Permission from salt commissioner for (NTPC - TNEB JV) 4 0 0kV D/C routing the line and railway crossing (2x500 MW) clearence required. (U-1 2. LILO of Alamathy - Sriperumbadur Commissioned 7/11. commissioned, U- at North Chennai TPS Sw. Yd. 2 slipped to 12th Supplementary trans.system associated with Vallur TPS Plan) 1. Vallur TPS- Melakottaiyur 400kV Engg. in progress. D/C 2. Tiruvalam(PG) - Chitoor 400kV D/C Engg. In progress Table no: SR-TN-02/Ch.-6 Neyveli TPS II 1. Neyveli TS -II – Pugalur 400kV S/C Commissioned 8/09 Extn. 2. Pugalur-Madurai 400kV D/C Commissioned 3/09 (NLC) ( 2x 250 3. Udumalpet-Arasur 400kV D/C Commissioned 7/10 MW ) 4. LILO of Neyveli-Sriperumbudur Commissioned 10/10 400kV S/C at Pondicherry D/C (U-1 5. LILO of Ramagundam-Khammam Commissioned 7/09 commissioned, U- 400kV S/C at Warrangal D/C 2 slipped to 12th 6. Neyveli TS-II Extn-Neyveli TS-II Commissioned 9/09 Plan) 400kV 2xS/C 7. Pugalur 400/230 kV S/S Commissioned 3/09 8. Warangal S/S 400/230 kV ICT-I & II Commissioned 7/09 9. Arasur S/S 400/230 kV Commissioned 7/10 10. Puducherry S/S 400/230 kV Commissioned 10/10 Table no: SR-TN-03/Ch.-6 Kudankulam 1. Kudankulam-Tirunelveli 400kV D/C Stringing completed. Commissioning Atomic PP(2x1000 Quad 1st delayed due to delay in Gen. Project MW) 2. Kudankulam-Tirunelveli 400kV D/C commissioning (slipped to 12th Quad 2nd Plan) 3. Tirunelveli-Udumalpet 400kV D/C 4. Tirunelveli-Edamon 400kV M/C 5. Edamon-Muvattupuzha 400kV D/C Completion uncertain due to severe ROW Quad problem¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 887 6. Muvattupuzha-North Trichur 400kV Sever ROW problem being faced. D/C Quad 7. LILO of Madurai-Trivandrum 400kV Commissioned D/C at Tirunelveli 2 x D/C 8. Tirunelveli 400/220kV S/S (2x315) ICT-I Commissioned 4/08, ICT- II commissioned 11/08 9. Udumalpet (PG) Ext. Commissioned 10. Muvattupuzha 400/220kV S/S ICT I Ready for commissioning.& II (2x315) erected. *Completion matching with line. 11. Trivandrum 400/220kV (1x315) Commissioned Table no: SR-TN-04/Ch.-6 North Chennai Ext. 1. NCTPS St.II- Alamathy 400kV M/C ROW at 10 loc .Court case TPS. 2. Alamathy - Sunguvarchatram ROW at 25 loc. Court case. (TNEB) ,2x600 400kV M/C MW 3. LILO of 230kV NCTPS- Mosur at Commissioned 11/10 NCTPS Stage II (for startup power) (slipped to 12th Plan) Table no: SR-TN-05/Ch.-6 Mettur TPS Stage 1. MTPS St.III - Arasur 400kV D/C WIP III (600 MW) U-1 2. MTPS St.III - Singarpet 400kV Tender to be floated. (slipped to 12th 3. LILO of 230kV MTPS -Malco at MTPS Stage III - Malco S/C line energised Plan) MTPS Stage III 2 / 11 for start up power 4. 230kV MTPS Stage III - commissioned Pallakkapalayam line 5. 230kV MTPS Stage III -Gobi line commissioned System Strengthening Schemes in ER: Scheme Description Status Table no: ER-IS-01/Ch.-6 Eastern Region i) Durgapur-Jamshedpur 400kV D/C line completed Strengthening ii) Durgapur-Jamshedpur Part line for Commissioned 1/11 Scheme-I LILO at Andal(for start up power to Durgapur STPS400kV D/C line iii) Jamshedpur - Baripada 400kV D/C line completed line (iv)Baripada - Mendhasal 400kV D/C commissioned line Table no: ER-IS-02/Ch.-6 Eastern Region Durgapur - Maithon 400kV D/C line Line completed Strengthening Scheme-II Table no: ER-IS-03/Ch.-6 Transmission 1. Koderma-Biharshariff (Quad) 400kV commissioned System for Start D/C up Power to DVC 2. Maithon RB - Maithon (PG) 400kV Line test charged on 30.9.10 and Maithon Right D/C Bank Gen. Project 3. LILO of 220KV D/C Fatehpur Line completed (UPPCL) - Kanpur (UPPCL) line at Fatehpur 4. LILO of 220KV D/C Dehri - commissioned Bodhgaya line at Gaya888 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Generation projects located in West Bengal: Generation Description Status Project Table no: ER-WB-01/Ch.-6 Teesta Low Dam Teesta LD IV – New Jalpaiguri Forest clearance obtained. Severe ROW IV (NHPC) WB ( p a c k a g e - I ) 2 2 0 k V D/C+ S/C (72.5+21 problem at 18 locations in plains & at many (4x 40 MW) km) locations in hills. (slipped to 12th Plan) Table no: ER-WB-02/Ch.-6 Teesta Low Dam Teesta LD III-New Jalpaiguri (package Forest clearance obtained.Severe ROW III II) 220kV S/C problem is being faced at 18 locations in (4x 33 MW) plains. (slipped to 12th Plan) Table no: ER-WB-03/Ch.-6 Mejia TPS Ph-II 1. Mejia TPS- Maithon(PG) 400kV D/C commissioned (DVC) 2 . L I L O o f Maithon - Jhamshedpur at (i)Commissioned 2/10 2x500 MW Mejia400kV D/C (ii)Evacuation facility available for U I (commissioned) Table no: ER-WB-04/Ch.-6 Durgapur TPS 1. Durgapur-Jamshedpur 400kV D/C ECL is not allowing construction on the (DVC) diverted route, diverted to allow setting up 2x500 MW of Andal Airport. Matter taken up with (commissioned) Ministry of Coal at MOP level. 2. LILO of Durgapur(PG) - Jamsedpur Commissioned 1/11. (PG) at Durgapur TPS 400kV D/C 3. Durgapur TPS - Raghunathpur ROW problem at 10 locations. Pile 400kV D/C foundations for 2 towers at Damodar river. Table no: ER-WB-05/Ch.-6 Santaldih TPP Santaldih - Bishnupur 220kV D/C Forest clearance problem for 16.618 (WBPDCL) U 5,6 - Hectares. (2x250 MW ) LILO of Santaldih-Durgapur (I Ckt) at Commissioned (U-5 Asansol 220kV D/C commissioned) LILO of STPS-Arambagh 220kV D/C at Commissioned Bishnupur Table no: ER-WB-06/Ch.-6 Sagardighi- U-I & II 1. Sagardighi-Parulia(PG) 400kV S/c commissioned (600 MW) on D/C line (State Sector) (commissioned) Generation projects located in Jharkhand : Description Status Table no: ER-JR-01/Ch.-6 Koderma TPS 1. Koderma - Biharsarriff 400kV quad Commissioned 5/11. (DVC) D/C . 2x500 MW 2. Koderma -Gaya 400kV D/C * Contigency arrangement being made to (U-1 connect Maithon -Gaya with Koderma- commissioned, U - Gaya, by-passing multi-ckt portion, to from Maithon-Koderma line¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 889 3 slipped to 12th 3. LILO of 132kV Barhi - Koderma at (i)Both Ckt commissioned on 24 Aug. Plan) Koderma S/S D/C 2010. (ii) Startup power now available Table no: ER-JR-02/Ch.-6 Maithon RBTPS 1. Maithon RBTPS - Maithon (PG) Line test charged on 30.9.10 (JV of DVC& Tata) 400kV D/C (2x 525 MW) 2. Maithon RBTPS - Ranchi (PG) commissioned (commissioned) 400kV D/C Generation projects located in Bihar : Table no: ER-BR-01 Barh-I U1,2,3 6. LILO of Kahalgaon-Patna 400 kV commissioned (1980 MW) D/c(Quad) at Barh (Central Sector) 7. Barh-Balia 400kV D/c line (quad) commissioned (slipped to 12th 8. Balia-Bhiwadi 2500 MW +500 kV One pole commissioned Plan) HVDC bipole line 9. Seoni-Bina 765kV S/c line commissioned 10. Two nos.66kV Earth Electrode lines (2 conductor of Twin Moose) 11. Ext. of Balia , Seoni, Bhiwadi and commissioned Bina 400 kV S/s 12. Balia and Bhiwadi HVDC Converter WIP Station Generation projects located in Meghalaya: Generation Description Status Project Table no: NER-MG-01/Ch.-6 Leshka Myntdu - I Leshka Myntu-Khliehriat 132kV D/C Charged at 33 kV HEP (MeSEB) (2x42 +1x42 MW ) (U-1, 2 commissioned, additional unit slipped to 12th Plan) Inter-Regional Transmission Schemes: Table no: IR-SS-01/Ch.-6 Generation Description Status Project East-West 1 Ranchi-Rourkela 400kV D/C Commissioned 11/10 Trans. Corridor 2 Rourkela – Raigarh 400kV D/C Test Charged 6/11 & commissioned Strengthening 6/11. 3 Raigarh - Raipur 400kV D/C Commissioned 9/10 **********890 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] CHAPTER - 7 XII PLAN TRANSMISSION PROGRAMME 7.1 EVOLVING TRANSMISSION SYSTEM FOR THE XII PLAN 7.1.1 Identification of transmission expansion requirement for a Plan period is done based on power system studies corresponding to the generation expansion programme and forecasted demand scenario expected at the end of that Plan. Transmission alternatives are identified after the detailed studies based on which the specific schemes are evolved, and re-evolved taking into account the changes in the generation programme from time to time and subsequently discussed and firmed up. The implementation programme is subsequently worked out keeping in view identification of projects, schemes and transmission elements that should be implemented matching with programme of generation capacity addition and load growth on yearly basis during the Plan. Timely development of transmission network requires firming-up of the specific transmission schemes corresponding to specific generation projects, which particularly in respect of inter-state transmission system, need to be done 3 to 5 years ahead of the target date of completion. 7.1.2 Meeting this requirement, most of the 12th Plan schemes have already been identified, discussed in the Regional Standing Committees on Power System Planning, finalized, scheme formulated and process of implementation initiated. Of the identified schemes, many are under construction, particularly those which are required to be completed in first half of the 12th Plan. 7.2 INTER-REGIONAL TRANSMISSION CAPACITY PROGRAMME 7.2.1 Inter-regional transmission capacity of National Grid gives an indication of strength of bond between regional grids. Inter-regional transmission capacity of all-India grid at the end of 10th Plan was 14050 MW. During 11th Plan 13900 MW capacity has been added taking the total inter-regional transmission capacity (at voltage level 132kV and above) to 27750 MW as on 31-03-2012. (This includes (i) 2100 MW Gaya- Balia 765kV S/C line which has been commissioned with contingency arrangement at 400kV and (ii) 2100 MW Sasaram–Fatehpur 765kV S/c line which has been commissioned at 765kV level as Gaya –Fetehpur line. It excludes 200MW of Bursur-Lower Sileru HVDC Monopole which is not in operation.) 7.2.2 During 12th Plan period a number of inter regional transmission links either associated with generation projects or as system strengthening schemes have been planned. These links would be implemented depending upon progress of associated generating stations. Considering the 84 GW generation addition scenario for 12th Plan, the inter-regional transmission links of about 44000 MW may be added during 12th Plan/ early 13th Plan period. Thus inter-regional transmission capacity at the end of 12th Plan/early 13th Plan is expected to be of the order of 72000 MW. Details are given in the following Table. Name of System At the Plan for Expected end of 11th 12th Plan/ at end of (all figures are in MW) Plan early 13th 12th Plan Plan/early 13th Plan ER – SR : Gazuwaka HVDC back to back 1000 1000 Balimela-Upper Sileru 220kV S/C 130 130 Talcher-Kolar HVDC Bipole 2000 2000 Upgradation of Talcher–Kolar HVDC bipole 500 500¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 891 ER-SR total 3630 3630 ER –NR : Muzaffarpur - Gorakhpur 400kV D/C (Quad Moose) with 2000 2000 TCSC Dehri-Sahupuri 220kV S/C 130 130 Patna-Balia 400kV D/C quad 1600 1600 Biharshariff-Balia 400kV D/C quad 1600 1600 Barh-Balia 400kV D/C quad # 1600 1600 Gaya–Balia 765kV S/C * 2100 2100 (LILOed at Varanasi in 12th Plan) Sasaram-Allahabad/Varanasi 400kV D/C line (Sasaram 1000 1000 HVDC back to back has been bypassed) Gaya-Varanasi 765kV S/C 2100 2100 Sasaram-Fatehpur 765kV S/C - line#1 # # 2100 2100 Barh-Gorakhpur 400kV D/C quad 1600 1600 Sasaram-Fatehpur 765kV S/C - line#2 2100 2100 ER-NR total 12130 5800 17930 ER - WR : Rourkela-Raipur 400kV D/C 1000 1000 TCSC on Rourkela-Raipur 400kV D/C 400 400 Budhipara-Korba220kV D/C+S/C 390 390 Ranchi-Sipat 400kV D/C (40% SC) 1200 1200 Ranchi-Rourkela-Raigarh-Raipur 400kV D/C with fixed 1400 1400 series capacitor, TCSC in parallel line Ranchi – WR(Bilaspur)Sipat Pooling Point 765kV S/C via 2100 2100 Dharamjaigarh during 12th plan Ranchi- Dharamjaigarh 765kV S/C 2100 2100 Jharsuguda -Dharamjaigarh-765kV D/C 4200 4200 ER-WR total 4390 8400 12790 ER - NER : Birpara -Salakati 220kV D/C 260 260 Malda-Bongaigaon 400kV D/C 1000 1000 Bongaigaon-Siliguri 400kV D/C Quad to be LILOed at 1600 1600 Alipurduar in 12th/13th plan ER-NER total 1260 1600 2860 NR - WR : Vindhyachal HVDC back to back 500 500 Auria-Malanpur 220kV D/C 260 260 Kota-Ujjain 220kV D/C 260 260 Agra-Gwalior 765kV S/C line-1 at 765 kV(earlier at 1100 1000 2100 400kV) Agra-Gwalior 765kV S/C line-2 at 765kV(earlier at 1100 1000 2100 400kV) Kankroli-Zerda 400kV D/C 1000 1000 Gwalior-Jaipur 765kV S/C#1 2100 2100 Gwalior-Jaipur 765kV S/C#2 2100 2100892 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] RAPP C&D- Shujalpur 400kV D/C 1000 1000 Champa-Kurukshetra +/-800kV 6000MW HVDC bipole 3000 3000 line, Ph.-I NR-WR total 4220 10200 14420 WR-SR : Chandrapur HVDC back to back 1000 1000 Bursur –L. Sileru 200kV HVDC mono pole @ -- -- Kolhapur-Belgaum 220kV D/C 260 260 Ponda – Nagajhari 220kV D/C 260 260 Narendra (GIS) – Kolhapur (new) 765kV D/C line (initially 2200 2200 charged at 400 kV) Raichur-Sholapur 765kVS/C #1 2100 2100 Raichur-Sholapur 765kV S/C #2 2100 2100 WR-SR total 1520 6400 7920 NER/ER-NR/WR : Bishwanath Chariyali – Agra +800 kV, 3000 MW HVDC 3000 3000 bipole. LILO of + 800kV Bishwanath Chariyali – Agra HVDC 3000 3000 Bipole at new pooling station in Alipurduar and addition of second 3000 MW HVDC NER/ER-NR/WR total 0 6000 6000 TOTAL ALL INDIA 27150 38400 65550 (220kV & above) 132kV/110kV Inter-Regional links $ 600 (-600) ---- (not to be included in 12th Plan) TOTAL ALL INDIA 27750 37800 65550 Note: @ - 200 MW HVDC Monopole is currently not in operation. $ - 132/110kV lines are operated in radial mode from time to time. (not to be included for 12th plan period) # - Barh-Balia line has been completed but is yet to be commissioned. *- Gaya- Balia 765kV S/C line has been commissioned with contingency arrangement at 400kV. ## - Sasaram–Fatehpur line has been commissioned at 765kV level as Gaya –Fatehpur line.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 893 A summary of growth of I-R transmission capacity, between various regions, is given below: (all figures are in MW) I-R Transmission Existing at At the end Addition Expected at end of Capacity between end of of during 12th Plan/ early 13th Regions 10th Plan 11th Plan 12th Plan Plan/ early 13th Plan ER-SR 3130 3630 - 3630 ER-NR 3430 12130 5800 17930 ER-WR 1790 4390 8400 12790 ER-NER 1260 1260 1600 2860 NR-WR 2120 4220 10200 14420 WR-SR 1720 1520 6400 7920 NER/ER-NR/WR 0 0 6000 6000 132/110kV radial links 600 600 (-600) 0 TOTAL ALL INDIA 14050 27750 37800 65550 Inter-Regional Transmisison Capacity, MW . 70000 NER/ER - NR/WR 60000 WR-SR ER-SR ER-NR 50000 ER-WR ER-NER NR-WR WR-SR NR-WR NER/ER - NR/WR 40000 ER-NER 30000 ER-WR WR-SR NR-WR 20000 ER-NER ER-WR ER-NR WR-SR NR-WR 10000 ER-NER ER-NR ER-WR ER-NR ER-SR ER-SR ER-SR 0 Existing at end of X Plan Expected at the end of XI Plan Expected at end of XII Plan894 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 7.2.4 Transmission capacity of inter-regional links and transfer capability between two regions The summation of the transmission capacities of inter-Regional links is a figurative representation of the bonds between the regions. These aggregate numbers do not indicate actual power transfer capability across different regions/States. The power transfer capability between any two points in a grid depends upon a number of variable factors, such as - load flow pattern, voltage stability, angular stability, loop flows and line loading of weakest link in the grid. For instance, present aggregate inter-regional transmission capacity of Northern Region is 16350 MW (12130 MW with ER and 4220 MW with WR), whereas, simultaneous transfer import capability of NR may work out to about 6000 - 7000 MW depending upon operational conditions. The system operator has to assess the transfer capability between two points of the grid from time to time and restrict the power flow accordingly. 7.3 DEVELOPMENT OF TRANSMISSION SYSTEM DURING 12TH PLAN - IMPLEMENTATION THROUGH COMPETITIVE BIDDING It may be noted that transmission schemes for the projects identified for 12th Plan have been mostly planned, firmed up in the Standing Committees for Power System Planning and the transmission agreements (BPTA) have been signed with the CTU as the nodal agency for Long Term Transmission Access to ISTS prior to the cut-off date of 5th January 2011. As such most of the ISTS schemes would be implemented by POWERGRID as central sector schemes. In addition Dedicated Transmission Lines from the inter-State Generating Stations would mostly be built by the generation developers as private sector lines. Some schemes, under the direction of the Empowered Committee for developing ISTS through competitive bidding have been identified and are in the various stages of implementation. These would materialize during 12th Plan period. Further, barring a few exceptions, new transmission schemes required for system strengthening, drawl of power by the states and for power evacuation to be identified in future would be implemented through competitive bidding process as far as possible. POWERGRID would also participate in the competitive bidding. Similarly in the State sector also it is likely that majority of the schemes during 12th Plan period would be implemented by the STUs. 7.4 TRANSMISSION SCHEMES PLANNED FOR XII PLAN PERIOD AND BEYOND 7.4.1 Coordinated planning process CEA, in coordination with Central Transmission Utility, State Transmission Utilities and Regional Power Committees have planned transmission systems required for –(i) evacuation of power from various generation projects which are in the horizon, and (ii) transmission systems required for strengthening of regional and inter-regional transmission networks, that are required for 12th Plan or early 13th Plan periods. Details of all such planned transmission schemes for evacuation of power and strengthening of grids are given in the following sections. Most of these schemes have been firmed up; however, these also include some schemes which are yet to be firmed up depending upon progress of associated generation project. These schemes mainly cover the 400kV and above transmission system. 7.4.2 Long Term Access (LTA) Process As part of the coordinated planning process, transmission addition requirements for grant of LTA in ISTS are also planned. The LTA to inter-State transmission system is governed by the regulations of the Central Regulatory Commission. The Central Transmission Utility (CTU) is the nodal agency for providing Long Term Access (LTA) which typically involves transmission addition through transmission planning process. Based on application by a generator for Long Term Access, the transmission system is planned for evacuation of power from generating stations. As grant of Long Term Access generally involves strengthening of ISTS which is identified through transmission planning, some basic inputs required are - (i) generation plant capacity, (ii) its location, (iii) time frame of materialization and (iv) beneficiaries to whom the power shall be delivered. However, in the present circumstances, none of these inputs is available with certainty. Under such a situation, it is prudent that transmission planners follow some innovative strategies to ensure fulfilment of broad objectives ensuring that - (i) transmission development takes place to cater to the transmission requirement, (ii) bottling up of the power is avoided, (iii) mismatch of generation and transmission system is avoided, (iv) congestion if observed in some part of grid should be removed at the earliest etc. In view of this, it becomes a challenge to evolve optimal transmission system and once the plan is in place it is equally challenging to plan its implementation so as to avoid mismatch between development of generation project and transmission system.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 895 7.4.3 Transmission Congestion Generally there is no congestion for transfer of power under LTA where beneficiaries have also been specified at the time of application for LTA. However, for short-term/medium term transfers of power, congestion can occur. The distribution utilities, as self-dispatched entities, do seasonal trading to meet their seasonal demand or sell their seasonal surplus, balancing the demand with supply and meeting contingency requirement. In India, the pattern of short term trading is erratic and depends on many extraneous factors particularly availability of funds with deficit DISCOMS etc. Sometimes a State may suddenly decide to reduce load shedding and resort to heavy short term purchase through trading. In such a situation, the drawal has to be restricted to the margins available in the existing transmission capacity. It is not possible to plan transmission system for catering to such a situation/eventuality. The congestions are generally there in all developed electricity markets in the world. 7.4.4 Flexible planning A few of these transmission schemes, particularly those required for generation projects coming up towards the last years of the 12th Plan and having common transmission system, could be altered depending upon progress of generation capacity linking to a common pooling point. 7.4.5 Schemes for Intra-State generating stations Transmission systems for some of the 12th Plan generation capacities under the State sector (or private sector but giving benefit to only home State) have also been tentatively considered for integrated system planning process, however, these transmission schemes are required to be planned and firmed up by the respective State Transmission Utilities. These are relatively small capacity generating stations for which evacuation is at 220kV or below voltage level. 7.4.6 THE SYSTEM STRENGTHENING SCHEMES OF STUS The system strengthening schemes of stus for development of state transmission network and for delivery of power from ists grid points up to discom level, which mainly is at 220kV and below voltage level, are required to be planned by respective stu. It is expected that each stu would complete this exercise well in advance for benefit during XII Plan and also inform cea in time so that such transmission addtions are simulated for future transmission planning studies. Information about some of the states is already known and has been included in the following sections. 7.4.7 DETAILS OF TRANSMISSION SCHEMES Following sections give region/state-wise list of transmission schemes planned or under planning process that would benefit during 12th / early 13th plan. Details of transmission elements covered under each scheme are given in annex–7.1 to annex-7.7. Northern Region –Transmission Scheme details Annex – 7.1 Western Region –Transmission Scheme details Annex – 7.2 Southern Region –Transmission Scheme details Annex – 7.3 Eastern Region –Transmission Scheme details Annex – 7.4 Northern-Eastern –Transmission Scheme details Annex – 7.5 Transmission Scheme details –Renewable Energy Sources in India Annex – 7.6 Transmission Scheme details –for power projects in Bhutan, Bangladesh Annex –7.7 and Nepal896 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 7.5 NORTHERN REGION – TRANSMISSION SCHEMES 7.5.1 System Strengthening Schemes planned in Northern Region Sl. System Strengthening Scheme Transmission System in Table no. No. 1. 765kV system for Central Part of Northern Grid-Part-I NR-IS-01 2. 765kV system for Central Part of Northern Grid-Part- NR-IS-02 II 3. 765kV system for Central Part of Northern Grid-Part- NR-IS-03 III 4. NR System Strengthening Scheme-XIX NR-IS-04 5. NR System Strengthening Scheme-XX NR-IS-05 6. NR System Strengthening Scheme-XXI NR-IS-06 7. NR System Strengthening Scheme-XXII NR-IS-07 8. NR System Strengthening Scheme-XXIII NR-IS-08 9. NR System Strengthening Scheme-XXIV NR-IS-09 10. NR System Strengthening Scheme-XXV NR-IS-10 11. NR System Strengthening Scheme-XXVI NR-IS-11 12. NR System Strengthening Scheme-XXVII NR-IS-12 13. NR System Strengthening Scheme-XXVIII NR-IS-13 14. NR Bus Reactor Schemes NR-IS-14 15. System Strengthening in NR (after delinking the NR-IS-15 scheme with North Karanpura Project) 16. Inter-connection between Srinagar (Uttrakhand) and NR-IS-16 Tehri 7.5.2 Evacuation Schemes of Generation Projects in Northern Region Generation projects located in Jammu & Kashmir: Sl. Project I/C, MW Sector Transmission System in Table no. No. 1 Kishen Ganga 330 Central NR-JK-01 2 Baghalihar II 450 State NR-JK-02 3 Uri-II HEP 240 Central NR-JK-01/ Ch.-6 4 Chutak HEP 44 Central NR-JK-02/ Ch.-6 5 Nimoo Bazgo 45 Central NR-JK-03/Ch.-6 Generation projects located in Himachal Pradesh: Sl. Project I/C, MW Sector Transmission System in Table no. No. 1 Parbati-II 800 Central NR-HP-01 2 Rampur 412 Central NR-HP-02 3 Koldam 800 Central NR-HP-03 4 Tidong-I 100 Private NR-HP-04 5 Sorang 100 Private NR-HP-05 6 UHL III 100 State NR-HP-06 7 Kashang I , II, III 195 State NR-HP-07 8 Sawara Kuddu 110 State NR-HP-08 9 Kutehr 260 Private NR-HP-09 10 Bajoli Holi HEP 180 Private NR-HP-10 11 Kunihar(Andhra+Nogli+ 196 State NR-HP-11 Micro)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 897 12 Sainj 100 State NR-HP-12 13 Chamera –III HEP 231 Central NR-HP-01/ Ch.-6 14 Parbati –III HEP 520 Central NR-HP-02/ Ch.-6 15 Budhil HEP 70 IPP NR-HP-04/Ch.-6 Generation projects located in Punjab: Sl. No. Project I/C, MW Sector Transmission System in Table no. 1 Nabha - Rajpura TPS 1400 Private NR-PB-01 2 Talwandi Sabo 1980 Private NR-PB-02 3 Govindwal Saheb 540 Private NR-PB-03 Generation projects located in Haryana: Sl. Project I/C, MW Sector Transmission System in Table no. No. 1 Jhajjar-I (Indira Gandhi) 500 Central NR-HR-01/Ch.-6 TPS (U- 3) 2 Jhajjar ( Mahatma 660 Private NR-HR-02/Ch.-6 Gandhi ) TPS U-2 Generation projects located in Delhi: Sl. Project I/C, MW Sector Transmission System in Table no. No. 1 Pragati CCGT Ph-III 750 State NR-DL-01/Ch.-6 (PPCL) (GT4, ST1,ST2) Generation projects located in Rajasthan: Sl. Project I/C, MW Sector Transmission System in Table no. No. 1 RAPP D (U-7,8) 1400 Central NR-RJ-01 2 Ramgarh-II 160 State NR-RJ-02 3 Chhabra TPS St-2 500 State NR-RJ-03 4 Kalisindh 1200 State NR-RJ-03 5 Barsingsar Ext 250 Central NR-RJ-04 6 Shree Cement ltd 300 IPP NR-RJ-05 7 Jallipa Kapurdi TPP 540 IPP NR-RJ-01/Ch.-6 (Unit 5 – 8) Generation projects located in Uttarakhand: Sl. Project I/C, MW Sector Transmission System in Table no. No. 1 Tapovan Vishnugarh 520 Central NR-UK-01 2 Singoli Bhatwari 99 IPP NR-UK-02 3 Phata Byong 76 IPP NR-UK-03 4 Dhauli Ganga + 260 Central NR-UK-04 Rupsiyabagar Khasiyabara898 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 5 Kotlibhel St-1A & B, 1045 Central NR-UK-05 Kotlibhel St-II 6 Tehri-II 1000 Central NR-UK-06 7 Lata Tapovan 171 Central NR-UK-07 8 Pala Maneri 480 State NR-UK-08 9 Sravanthi Energy Private 450 IPP NR-UK-09 ltd. 10 Srinagar 330 Private NR-UK-10 Generation projects located in Uttar Pradesh: Sl. Project I/C, MW Sector Transmission System in Table no. No. 1 RihandIII(U-5&6) 1000 Central NR-UP-01 2 Singrauli St-III 500 Central NR-UP-02 3 Meja 1320 Central NR-UP-03 4 Bara 1980 Private NR-UP-03 5 Karchana 1320 Private NR-UP-03 6 Latilpur TPS 1980 State NR-UP-04 7 Anpara D 1000 State NR-UP-05 8 Parichha Ext (U -5, 6) 500 State NR-UP-03/Ch.-6 9 Harduaganj TPS Ext U-9 2 5 0 State NR-UP-02/Ch.-6 7.6 WESTERN REGION – TRANSMISSION SCHEMES 7.6.1 System Strengthening Schemes planned in Western Region: Sl. System Strengthening Scheme Transmission System in Table no. No. 1 Establishment of 400/220kV S/s in UT DNH WR-IS-01 2 Establishment of 400/220kV S/s in UT Daman WR-IS-02 3 Split Bus arrangement and reconfiguration/shifting WR-IS-03 of terminating lines at Raipur 400kV S/s 7.6.2 Evacuation Schemes of Generation Projects in Western Region Generation projects located in Gujarat: Sl. Project I/C,MW Sector Transmission System in Table no. No. 1. KAPP Extn U- 1400 Central WR-GJ-01 3,4,(1400MW)(Central sector) 2. UMPP Mundra 4000 IPP WR-GJ-02 (U-1 commissioned in 11th WR-GJ-03 Plan) WR-GJ-09 3. Pipavav TPS - Videocon 1200 IPP WR-GJ-04 4. Dhuvaran EXT. 360 State WR-GJ-05 5. Bhavnagar 500 State WR-GJ-06 6. Sikka Rep.Ext. 500 State WR-GJ-07 7. Pipavav CCPP 702 State WR-GJ-08 8. Ukai Ext 500 State WR-GJ-10 9. Wanakbori TPS 500 State WR-GJ-11 10. Shapoorji Pallonji Energy Ltd. 1320 IPP WR-GJ-12¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 899 11. DGEN TPS -Torrent Power 1200 IPP WR-GJ-13 Ltd. 12. NTPC Limited (Gandhar-II) 1300 Central WR-GJ-14 13. NTPC Limited (Kawas-II) 1300 Central WR-GJ-15 14. Gujarat Fluorochemicals 300 IPP WR-GJ-16 Ltd.(GFL) 15. Sintex Power Ltd. 1708 IPP WR-GJ-17 16. Essar -Saliya Power U-2 600 IPP WR-GJ-05/Ch.-6 Generation projects located in Madhya Pradesh: Sl. Project I/C,MW Sector Transmission System in Table no. No. 1. Vindhyachal IV (U-11,12) 1000 Central WR-MP-01 2. UMPP Sasan 3960 IPP WR-MP-02 WR-GJ-09 3. Bina Power 500 IPP WR-MP-03 WR-CG-17 4. Mahan - Essar Power 1200 IPP WR-MP-04 5. Aryan MP Power Generation 1200 IPP WR-MP-05 Company Ltd. WR-CG-17 6. DB Power (MP) ltd. U-1,2 1320 IPP WR-MP-05 7. Chitrangi Power 5940 IPP WR-MP-05 8. Nigri TPP - Jaiprakash 1320 IPP WR-MP-06 Power WR-CG-17 9. Moserbear Power (Phase 1) 1200 IPP WR-MP-07 WR-CG-23 10. Today energy (MP) 1320 IPP WR-MP-07 WR-CG-23 11. Jhabua Power 1200 IPP WR-MP-07 WR-CG-23 12. SJK Powergen Ltd 1320 IPP WR-MP-07 13. Malwa (shree Singhji) TPP 1200 State WR-MP-08 14. Satpura EXT (U-10,11) 500 State WR-MP-09 15. Essar Power MP Ltd. 600 IPP WR-MP-11 (Mahan Phase II) 16. Maheshwar HEP 400 IPP WR-MP-01/Ch.-6 Generation projects located in Maharashtra: Sl. Project I/C, Sector Transmission System in Table no. No. MW 1. Mauda St-I ( U- 1& 2) 1000 Central WR-MH-01 2. Mauda St-II 1320 Central WR-MH-02 3. Tiroda -Adani Ph I,U 1,2,3 1320 IPP WR-MH-03 4. Tiroda -Adani Ph-II, U1,2 1320 IPP WR-MH-03 5. India Bull -Nasik 1350 IPP WR-MH-04 6. India Bull- Nandangaonpet- 1350 IPP WR-MH-05900 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Amravati 7. Bela TPP- Ideal Power 540 IPP WR-MH-06 8. Dhariwal Infrastructure 600 IPP WR-MH-07 9. EMCO_Warora (Maharshtra) 600 IPP WR-MH-08 10. Parli + Replacement 250 State WR-MH-09 11. Koradi - II 1980 State WR-MH-10 12. ChandrapurTPS-II (U -8,9) 1000 State WR-MH-11 (U-8 commissioned in 11th Plan) 13. Dhopave 1600 State WR-MH-12 14. Uran Ext 1040 IPP WR-MH-13 15. GEPL TPP U-1&2 120 IPP WR-MH-14 16. NPCIL ,Jaitapur 3480 Central WR-MH-15 17. Jinbhuvish Power Gen Pvt 600 IPP WR-MH-16 Ltd(600 18. Hindustan Electricty Gen 1137 IPP WR-MH-17 Company Ltd (HEGCL) Generation projects located in Chattisgarh: Sl. Project I/C, Sector Transmission System in Table no. No. MW 1. Sipat -I 1980 Central WR-CG-01 2. RKM Powergen Pvt ltd 1440 IPP WR-CG-02 (Uchpanda TPP) WR-CG-08 to (U 1- 4) WR-CG-16 3. SKS Power ltd U 1-4 1200 IPP WR-CG-02 (DharmapuraTPP) WR-CG-08 to WR-CG-16 4. D B Power 1200 IPP WR-CG-02 WR-CG-08 to WR-CG-16 5. Athena Chhattisgarh Power 1200 IPP WR-CG-02 Ltd. WR-CG-08 to WR-CG-16 6. Avantha Bhandar TPP 600 IPP WR-CG-02 WR-CG-08 to WR-CG-16 7. Cosmos Sponge & Power Ltd. 350 IPP WR-CG-02 (CSPL) 8. Visa Steel Ltd. 450 IPP WR-CG-02 9. GMR Chhattigarh 1370 IPP WR-CG-03 WR-CG-08 to WR-CG-16 10. KSK (Akltara) Mahanadi power 2400 IPP WR-CG-04 WR-CG-08 to WR-CG-16 11. Karnataka Power Corp 1600 IPP WR-CG-04 Ltd.(KPCL) WR-CG-08 to WR-CG-16 12. Lanco Amarkantak U-3 & 4 1320 IPP WR-CG-04 WR-CG-08 to WR-CG-16¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 901 13. M B Power (Chattisgarh) Ltd 1320 IPP WR-CG-04 14. Aryan Coal Banification Ltd 1200 IPP WR-CG-05 WR-CG-08 to WR-CG-16 15. Dheeru Powergen and PTC 1050 IPP WR-CG-05 India WR-CG-17 16. Spectrum Power 100 IPP WR-CG-05 WR-CG-17 17. Maruti Clean Coal & Power 300 IPP WR-CG-05 Ltd. WR-CG-17 18. Raigarh Ph III U1-4 (Jindal 2400 IPP WR-CG-06 Power) WR-CG-08 to WR-CG-16 19. TRN Energy (2x300 MW) 600 IPP WR-CG-06 WR-CG-08 to WR-CG-16 20. Sarda Energy & 350 IPP WR-CG-06 minerals(SEML) WR-CG-08 to WR-CG-16 21. Jayaswal New Urja Ltd(JNUL) 600 IPP WR-CG-06 WR-CG-08 to WR-CG-16 22. BALCO 600 IPP WR-CG-07 WR-CG-08 to WR-CG-16 23. Vandana Vidyut 540 IPP WR-CG-07 WR-CG-08 to WR-CG-16 24. Swastik TPP U-1 25 IPP WR-CG-19 25. Ratija TPP 50 IPP WR-CG-20 26. MARWA CSEB 1000 State WR-CG-21 27. Korba (W) St-III (U -5) 500 State WR-CG-22 28. Kasaipalli TPP U-2 135 IPP WR-CG-03/Ch.-06 7.7 SOUTHERN REGION – TRANSMISSION SCHEMES 7.7.1 System Strengthening Schemes planned in Southern Region: Sl. System Strengthening Scheme Transmission System in Table no. No. 1 System Strengthening Schemes in SR-XII SR-IS-01 2 System Strengthening Schemes in SR-XIII SR-IS-02 3 System Strengthening Schemes in SR-XIV SR-IS-03 4 System Strengthening Schemes in SR-XV SR-IS-04 5 System Strengthening Schemes in SR-XVI SR-IS-05 6 System Strengthening Schemes in SR-XVII SR-IS-06 7 System Strengthening Schemes in SR-XVIII SR-IS-07 8 System Strengthening Schemes in SR-XIX SR-IS-08 9 HVDC Bipole Strengthening in Southern Region SR-IS-09 10 System Strengthening in SR for import of power SR-IS-10 from ER902 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 7.7.2 Evacuation Schemes of Generation Projects in Southern Region Generation projects located in Andhra Pradesh: Sl. Project I/C, MW Sector Transmission System in Table no. No. 1. Simhapuri Coastal-KPTNM 600 IPP SR-AP-01 (U-1 commissioned in 11th SR-AP-02 Plan) 2. Meenakshi Energy ST-I + II 1000 IPP SR-AP-01 SR-AP-02 3. Thermal Powertech Corp 1980 IPP SR-AP-01 SR-AP-02 4. Krishnapatnam Navyuga 1320 IPP SR-AP-01 SR-AP-02 5. Kineta Power 1980 IPP SR-AP-01 SR-AP-02 6. NCC Power 1320 IPP SR-AP-01 SR-AP-02 7. VSF Projects Ltd 350 IPP SR-AP-01 8. Ultra Mega Krishnapatnam 3960 IPP SR-AP-03 (scheme delinked/ diverted SR-AP-04 from generation project, parts being implemented as system strengthening) 9. East Coast- Bhavanapadu 1320 IPP SR-AP-05 TPP SR-AP-06 10. GMR Rajmundry 768 IPP SR-AP-07 SR-AP-08 11. Spectrum-Vemagiri-Gas 1400 IPP SR-AP-07 SR-AP-08 12. Reliance-Vemagiri-Gas 2400 IPP SR-AP-07 SR-AP-08 13. GVK-Gautmi-Vemagiri-Gas 800 IPP SR-AP-07 SR-AP-08 14. GVK-Jegrupadu-Vemagiri- 800 IPP SR-AP-07 Gas SR-AP-08 15. RVK Energy 360 IPP SR-AP-07 16. Hinduja Vizag 1040 IPP SR-AP-09 17. Lanco Kondapally St-III 740 IPP SR-AP-10 18. Rayalseema St -III (U-6) 600 State SR-AP-11 19. Pulichintala HEP 120 State SR-AP-12 20. Lower Jurala (U1-6) HEP 240 State SR-AP-13 21. Sri Damodaram Sanjeevaiah 1600 State SR-AP-14 TPP (Krishnapatnam TPP) 22. Nagarjuna Sagar TR HEP 50 State SR-AP-02/Ch.-6 23. Kakatiya TPP II 600 State SR-AP-04/Ch.-6 Generation projects located in Karnataka: Sl. Project I/C, MW Sector Transmission System in Table no. No. 1. Torangallu Jindal U-3 300 IPP SR-KA-01 2. Gundia HEP 400 State SR-KA-02 3. Yermarus TPP 1600 State SR-KA-03¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 903 4. Edlapur 800 State SR-KA-03 5. Kudgi TPS Phase-I 2400 Central SR-KA-04 6. Surena Power Ltd. 420 IPP SR-KA-05 Generation projects located in Kerala: Sl. Project I/C, MW Sector Transmission System in Table no. No. 1. Thottiar 40 State SR-KE-01 2. Pallivasal 60 State SR-KE-02 Generation projects located in Tamilnadu: Sl. Project I/C, MW Sector Transmission System in Table no. No. 1. Tuticorin JV-NLC 1000 Central SR-TN-01 2. Coastal Energen-Tuticorin 1200 IPP SR-TN-02 SR-TN-03 3. Ind Barath-Tuticorin 1320 IPP SR-TN-02 SR-TN-03 4. Chettinad Power 1200 IPP SR-TN-02 corporation Private Ltd 5. NSL-Nagapatnam 1320 IPP SR-TN-04 SR-TN-05 6. PPN Power Generating 1080 IPP SR-TN-04 Company SR-TN-05 7. Chettinad Power 1320 IPP SR-TN-04 Corporation Ltd. SR-TN-05 8. PEL Power Ltd(1050 MW) 1050 IPP SR-TN-04 SR-TN-05 9. IL & FS Tamil Nadu Power 1200 IPP SR-TN-04 Company Ltd SR-TN-05 10. RegenPowertech Pvt ltd. 600 IPP SR-TN-06 11. Udanguddi JV 1600 State SR-TN-07 12. Kalpakkam PFBR 500 Central SR-TN-08 13. Vallur(Ennore )JV U-2,3 1000 Central SR-TN-01/ Ch.-6 14. Neyveli TPS II U-2 250 Central SR-TN-02/Ch.-6 15. Kudankulam Atomic St-I 2000 Central SR-TN-03/Ch.-6 16. North Chennai Ext U-1,2 1200 Central SR-TN-04/Ch.-6 17. Bhawani Barrage II &III 60 State SR-TN-05/Ch.-6 18. Mettur TPS St-III (U-1) 600 State SR-TN-06/ Ch.-6 7.8 EASTERN REGION – TRANSMISSION SCHEMES 7.8.1 System Strengthening Schemes planned in Eastern Region: Sl. System Strengthening Scheme Transmission System in Table no. No. 1 Eastern Region Strengthening Scheme-III ER-IS-01 2 Eastern Region Strengthening Scheme-IV ER-IS-02 3 Eastern Region Strengthening Scheme-V ER-IS-03 4 Eastern Region System Strengthening Scheme –VII (for ER-IS-04 West Bangal) 5 Eastern Region System Strengthening Scheme -V I (for ER-IS-05 Bihar)904 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 7.8.2 Evacuation Schemes of Generation Projects in Eastern Region Generation projects located in Bihar: Sl. Project I/C, MW Sector Transmission No. System in Table no. 1 Barh II U 1,2 1320 Central ER-BR-01 ER-JH-06 2 Nabi Nagar JV 1000 Central ER-BR-02 (Rly+NTPC) ER-JH-06 3 New Nabi Nagar JV 1980 Central ER-BR-03 (Bihar+NTPC) 4 Muzzafarpur ext JV 390 Central ER-BR-04 5 Barh-I (U-1,2,3) 1980 Central ER-BR-01/Ch.-6 Generation projects located in Jharkhand: Sl. Project I/C, MW Sector Transmission No. System in Table no. 1. Bokaro Expansion 500 Central ER-JH-01 ER-JH-01/ Ch.-6 2. Koderma TPP U-2 500 Central ER-JH-01/ Ch.-6 3. Adhunik Power – Jh. 540 IPP ER-JH-02 ER-JH-03 ER-JH-04 4. Corporate (Phase-I) 540 IPP ER-JH-02 (Mata Shri Usha TPP) ER-JH-03 ER-JH-04 5. Corporate (Phase-II) 540 IPP ER-JH-02 ER-JH-03 ER-JH-04 6. Essar Power /Tori TPS 1200 IPP ER-JH-02 ER-JH-03 ER-JH-04 7. Tilaiya UMPP 4000 IPP ER-JH-05 ER-JH-06 Generation projects located in Orissa: Sl. Project I/C, MW Sector Transmission No. System in Table no. 1 Sterlite TPP U -4 600 IPP ER-OR-01, ER-OR-02 (U-1, 2, 3 commissioned in ER-OR-03, ER-OR-04 11th Plan) ER-OR-05 2 Malibrahmani TPP/Monet 1050 IPP ER-OR-01, ER-OR-02 Power ER-OR-03, ER-OR-04 ER-OR-05 3 Kamlanga TPP – GMR 1050 IPP ER-OR-01, ER-OR-02 ER-OR-03, ER-OR-04 ER-OR-05 4 Malaxmi – Nav Bharat 1050 IPP ER-OR-01, ER-OR-02 ER-OR-03, ER-OR-04 ER-OR-05 5 Ind Barath – Orissa 700 IPP ER-OR-01, ER-OR-02¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 905 ER-OR-03, ER-OR-04 ER-OR-05 6 Jindal India Thermal 1200 IPP ER-OR-01, ER-OR-02 ER-OR-03, ER-OR-04 ER-OR-05 7 Lanco Babandh 2640 IPP ER-OR-01, ER-OR-02 ER-OR-03, ER-OR-04 ER-OR-05 8 Derang TPP- JITPL 1200 IPP ER-OR-01, ER-OR-02 ER-OR-03, ER-OR-04 ER-OR-05 Generation projects located in Sikkim: Sl. Project I/C, MW Sector Transmission No. System in Table no. 1 Teesta – III HEP 1200 IPP ER-SM-01, ER-SM-02 ER-SM-03 2 Teesta-VI 500 IPP ER-SM-01, ER-SM-02 ER-SM-03 3 Rangit-IV 120 IPP ER-SM-01, ER-SM-02 ER-SM-03 4 Bhasmey 51 IPP ER-SM-01, ER-SM-02 ER-SM-03 5 Jorethang Loop 96 IPP ER-SM-01, ER-SM-02 ER-SM-03 6 Rongnichu 96 IPP ER-SM-01, ER-SM-02 ER-SM-03 7 Chujachen HEP (Gati ) 99 IPP ER-SM-01, ER-SM-02 ER-SM-03 8 Panan 300 IPP ER-SM-04, ER-SM-05 ER-SM-06 9 Ting Ting 99 IPP ER-SM-04, ER-SM-05 ER-SM-06 10 Tashiding 97 IPP ER-SM-04, ER-SM-05 ER-SM-06 11 Dikchu 96 State ER-SM-04, ER-SM-05 ER-SM-06 Generation projects located in West Bengal: Sl. Project I/C, Sector Transmission No. MW System in Table no. 1 Raghunathpur Ph-1 (U-1 & 2) 1200 Central ER-WB-01 ER-WB-02 2 Common Transmission Central ER-WB-02 System for import of power from DVC by NR 3 Transmission system for Central ER-WB-03 Pooling Station in ER and transfer of power to NR/WR from projects in Bhutan 4 CESC Haldia 600 Private ER-WB-04 5 Durgapur DPL New(U-8) 250 State ER-WB-05 6 Teesta Low Dam IV 160 Central ER-WB-01/Ch.-6 7 Teesta Low Dam III 1 3 2 Central ER-WB-02/Ch.-6906 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 7.8.3 Eastern Region – State Grid Strengthening Schemes of STUs: Sl. System Strengthening Scheme Transmission System in Table no. No. 1 System Strengthening Scheme in West Bengal ER-SS-WB 7.9 NORTH-EASTERN REGION – TRANSMISSION SCHEMES 7.9.1 System Strengthening Schemes planned in North-Eastern Region: Sl. System Strengthening Scheme Transmission System in Table no. No. 1 Strengthening of Transmission in NER Phase-I & II NER-IS-01 7.9.2 Evacuation Schemes of Generation Projects in North-Eastern Region Generation projects located in Arunachal Pradesh : Sl. Project I/C, MW Sector Transmission No. System in Table no. 1 Pare Dikrong HEP 110 Central NER-ArP-01 2 Kameng 600 Central NER-ArP-02 NER-ArP-04 3 Lower Subansiri 2000 Central NER-ArP-03 NER-ArP-04 4 Khuitam 33 IPP NER-ArP-05 5 Demwe Lower 341 IPP NER-ArP-06 6 KSK Dibbin Hydro Power 120 IPP NER-ArP-07 Ltd NER-ArP-08 7 Adishankar Khitam power 66 IPP NER-ArP-07 ltd NER-ArP-08 8 Patel Hydro pvt Ltd 273 IPP NER-ArP-07 (Ghoongri and Saskngrong) NER-ArP-08 9 SEW Nafra power 120 IPP NER-ArP-07 Corporation Ltd NER-ArP-08 Generation projects located in Assam: Sl. Project I/C, MW Sector Transmission No. System in Table no. 1 Bongaigaon TPP 250 Central NER-AS-01, NER-AS-02 2 Namrup+Ext 100 State NER-AS-03 Generation projects located in Meghalaya: Sl. Project I/C, MW Sector Transmission No. System in Table no. 1 New Umtru 40 State NER-MG-01 2 Leshka Myntdu HEP (add. 42 State NER-MG-01/Ch.-6 Unit) Generation projects located in Mizoram: Sl. Project I/C, MW Sector Transmission¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 907 No. System in Table no. 1 Tuirial HEP 60 Central NER-MZ-01 Generation projects located in Tripura: Sl. Project I/C, MW Sector Transmission No. System in Table no. 1 Pallatana 726 Central NER-TR-01 NER-AS-02 2 Monarchak Gas project 105 Central NER-TR-02 7.9.3 North-Eastern Region – State Grid Strengthening Schemes of STUs: Sl. System Strengthening Scheme Transmission System in Table no. No. 1 System Strengthening Scheme in Arunachal NER-SS-ArP Pradesh 2 System Strengthening Scheme in Assam NER-SS-AS 3 System Strengthening Scheme in Manipur NER-SS-MR 4 System Strengthening Scheme in Mizoram NER-SS-MZ 5 System Strengthening Scheme in Tripura NER-SS-TR 6 System Strengthening Scheme in Meghalaya NER-SS-MG 7 System Strengthening Scheme in Nagaland NER-SS-NG 7.10 TRANSMISSION SCHEME FOR RENEWABLE ENERGY SOURCES IN INDIA Sl. Scheme IC, MW Transmission System in Table No. no. 1 Solar & New Wind Power Projects in Rajsthan 2650 RES- RJ-01 (2650 MW) 2 Transmission system for Solar projects in Charanka 950.5 RES- GJ-01 Solar Park (950.5 MW) 3 Transmission system for wind projects in Gujarat 4500 RES- GJ-02 4 System Strengthening for wind projects in - RES-GJ-03 Gujarat (4500 MW) 5 Wind projects in Tamil Nadu (Phase-I ) 6300 RES-TN-01 6 Wind projects in Tamil Nadu (Phase-II) 5800 RES-TN-02 7 Wind projects in Andhra Pradesh 3150 RES-AP-01 8 Wind projects in Karnataka 600 RES-KR-01 7.11 EVACUATION SCHEMES FOR GENERATION PROJECTS IN BHUTAN, BANGLADESH AND NEPAL (FOR IMPORT OF POWER IN INDIA) Sl. Project I/C, MW Sector Transmission No. System in Table no. 1 Phunatsangchu St-I 1200 - BH-01 2 Phunatsangchu St-II 990 - BH-02 3 Mangdhechu 720 - BH-03908 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 4. Indian Grid Strengthening for - - Bh-04 import of Bhutan Surplus Sl. Scheme Transmission No. System in Table no. 1 Cross border interconnection between India and BG-01 Bangladesh Grid for facilitating exchange of power up to 500 MW Sl. Scheme Transmission No. System in Table no. 1 Cross border interconnection between India and Nepal NP-01 Grid for facilitating exchange of power between the two countries 7.12 765KV TRANSMISSION SYSTEMS PLANNED FOR 12TH PLAN/ EARLY 13TH PLAN 7.12.1 The 765kV system would play increasing role in development of National Grid and its ability to efficiently deliver bulk power from clusters of generation projects that are envisaged in coastal and pit-head areas. During 11th Plan, a number of 765kV lines and substations have been added and a few more are under-construction. The trend of increasing 765kV system in the grid is going to continue in the 12th Plan as well. A number of new 765kV lines and substations have been planned for evacuation bulk power in the range of 3000 – 6000 MW to longer distances. Their actual realization would depend upon progress of associated generation projects. Growth of 765kV system in India, since end of X Plan, is depicted below: Transmission Lines (ckm): 765 kV 765 kV 765 kV 9% 1% 2% 400 kV 400 kV 44% 39% 220 kV 220 kV 400 kV 220 kV 54% 48% 43% 60% Substations (MVA): 765 kV 76 05 % kV 40 30 7 %kV 2% 765 kV 25% 400 kV 38% 220 kV 46% 220 kV 60% 220 kV 63% 400 kV 29% 10th Plan 11th Plan 12th Plan/early 13th Plan (as Planned)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 909 7.12.2 The 765kV transmission systems that have been planned and are expected to be implemented during 12th Plan or early 13th Plan period are given in the following region-wise Tables. Some of these 765 kV substations would initially be operated at 400 kV. Their 765 kV operation would depend upon progress of associated generation projects. 7.12.3 Northern Region - 765kV Transmission system: 765kV Transmission lines in Type At the end At the end Planned Expected at end of Northern Region of 10th of 11th for 12th / 12th / early 13th Plan Plan early 13th (values in ckm) Plan Plan Anpara-Unnao S/C 409 409 409 Shifting of Unnao-Anpara’B’ to S/C 2 2 Anpara’C’ Kishenpur-Moga L-1(W) S/C 275 275 275 Kishenpur-Moga L-2(E) S/C 287 287 287 Tehri-Meerut Line-1 S/C 186 186 186 Tehri-Meerut Line-2 S/C 184 184 184 LILO of Tehri-Meerut Line-1 at 2xS/C 8 8 Tehri Pooling Point LILO of Tehri-Meerut Line-2 at 2xS/C 13 13 Tehri Pooling Point Fatehpur-Agra S/C 334 334 Balia-Lucknow S/C 320 320 Balia-Lucknow (2nd Ckt) S/C 250 250 Lucknow-Bareilly S/C 250 250 Lucknow-Bareilly (2nd Ckt) S/C 270 270 Bareilly-Meerut 2xS/C 400 400 Agra-Meerut S/C 260 260 Agra-Jhatikra S/C 240 240 Jhatikra-Bhiwani S/C 80 80 Bhiwani-Moga S/C 273 273 Meerut-Bhiwani S/C 260 260 Meerut-Moga S/C 260 260 Jaipur – Bhiwani 765kV S/C 250 250 Jaipur – Bhiwani 765kV (2nd S/C 260 260 ckt) Anta PP – Phagi (Jaipur South- 2XS/C 450 450 RVPNL) Varanasi – Kanpur D/C 331 331 Kanpur – Jhatikra S/C 480 480 Orai – Bulandshahar – Sonipat S/C 525 525 Bara-Mainpuri 2XS/C 700 700 Mainpuri – G. Noida S/C 270 270910 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Unnao - Mainpuri S/C 175 175 Mainpuri – Hapur S/C 250 250 LILO of Agra - Meerut at G. S/C 20 20 NOIDA Hapur – G.Noida S/C 50 50 Fatehpur-Agra (with Sasan) S/C 340 340 765 kV Substations in At the end At the end Planned Expected at end Northern Region of 10th of 11th for 12th / of 12th / early 13th Plan Plan early 13th Plan Plan (values in MVA) Unnao 1000 1000 2000 Agra 3000 3000 Meerut 3000 3000 Meerut (Augmentation) 1500 1500 Lucknow 3000 3000 Fatehpur 3000 3000 Balia 3000 3000 Bareilly 3000 3000 Tehri 4500 4500 Kishenpur 3000 3000 Moga (Aug.) 3000 3000 Bara (Switchyard) 3000 3000 Bhiwani 2000 2000 Jhatikalan 6000 6000 Varanasi 3000 3000 Kanpur 3000 3000 Orai 3000 3000 Jaipur 3000 3000 Phagi (Jaipur South-RVPNL) 3000 3000 Anta (Barn) PPJaipur 3000 3000 Bulandshahr 3000 3000 Hapur 3000 3000 Sonepat 3000 3000 Mainpuri 2000 2000 G Noida 3000 3000 7.12.4 Western Region - 765kV Transmission system: 765kV Transmission lines in Type At the end At the end Planned Expected at end of Western Region of 10th of 11th for 12th / 12th / early 13th Plan Plan early 13th (values in ckm) Plan Plan Gwalior-Agra Line-1 S/C 128 128 128 Gwalior-Agra Line-2 S/C 128 128 Gwalior-Bina Line-1 S/C 235 235 235 Gwalior-Bina Line-2 S/C 233 233 Gwalior-Bina Line-3 S/C 230 230 Gwalior- Jaipur 2xS/C 2xS/C 600 600¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 911 Rihand-III - Vindhyachal D/C 64 64 Jabalapur - Orai S/C 350 350 LILO of Satna – Wardha at Orai 2xS/C 60 60 Sipat-Seoni Line-1 S/C 351 351 Sipat-Seoni Line-2 S/C 354 354 Seoni-Bina S/C 293 293 Seoni-Wardha Line-1 S/C 269 269 Seoni-Wardha Line-2 S/C 261 261 Vindhyachal Pool-Satna 2xS/C 499 499 Satna-Gwalior 2xS/C 723 723 Vindhyachal Pool-Sasan S/C 6 6 Sasan-Satna-Line-I S/C 257 257 Sasan-Satna—Line-II S/C 260 260 Satna-Bina –Line-I S/C 274 274 Satna-Bina-Line-II S/C 276 276 Bina-Indore S/C 303 303 Wardha – Jabalpur Pooling D/C 700 700 station Raigarh(Kotra)- Champa S/C 105 105 Raigarh (Kotra)- Raigarh D/C 50 50 (Tamnar) Raipur-Wardha 2XD/C 1520 1520 Wardha-Aurangabad 2XD/C 1420 1420 Aurangabad-Padghe D/C 279 279 Raigarh PS.(Kotra)–Raipur PS D/C 250 250 Champa PS – Raipur PS D/C 150 150 Champa PS – Dharamjaigarh S/C 50 50 Indore – Vadodara 765kV S/C S/C 293 293 Dharamjaigarh / near Korba – 2xD/C 1500 1500 Jabalapur Pool Jabalpur Pooling Station – Bina D/C 473 473 Jabalapur Pooling station – S/C 260 260 Bhopal Bhopal – Indore S/C 173 173 Sholapur – Pune S/C 269 269 Aurangabad- Dhule (IPTC) S/C 188 188 Dhule (IPTC) – Vadodara (PG) S/C 260 260 Tiroda (Gondia) – Koradi III 2xS/C 120 120 Koradi III – Akola-II 2xS/C 270 270 Akola-II – Aurangabad (PG) 2xS/C 240 240 Aurangabad-II-Auragabad D/C 60 60 Sholapur-Pune D/C 265 265 LILO of both ckts of Sipat- S/C 16 16 Seioni at WR at WR Pooling Point (Bilaspur)912 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 765kV Substations in At the end At the end Planned Expected at end of Western Region of 10th of 11th for 12th / 12th / early 13th Plan Plan early 13th Plan Plan (values in MVA) Seoni 4500 4500 Sipat 1500 1500 Gwalior 3000 3000 Bina 2000 2000 Wardha 4500 4500 Satna 2000 2000 Indore 3000 3000 Vindhyachal Pooling Stn 3000 3000 Jabalapur Pool 3000 3000 Sholapur 3000 3000 Pune 3000 3000 Aurangabad (PG) 3000 3000 Aurangabad - II 3000 3000 Padghe (PG) 3000 3000 Vadodara 3000 3000 WR Pooling Station- Bilaspur(near Sipat) 3000 1500 4500 Raipur Pooling Station 1500 1500 Raigarh (Kotra) Pooling St. 6000 6000 Raigarh(Tamnar) Pooling St 4500 4500 Dharamjaigarh 4500 4500 Champa Pooling St 9000 9000 Dhule (IPTC) 3000 3000 Bhopal Pooling Station 3000 3000 Tiroda 3000 3000 Koradi 3000 3000 Akola 1500 1500 7.12.5 Southern Region – 765kV Transmission system: 765kV Transmission lines in Type At the end At the end Planned Expected at end Southern Region of 10th of 11th for 12th / of 12th / early 13th Plan Plan early 13th (values in ckm) Plan Plan Tiruvalam – Kurnool S/C 342 342 Nellore Pooling Station – D/C 600 600 Kurnool Kurnool – Raichur S/C 116 116 Kurnool-Raichur (2nd ckt) S/C 126 126 Vemagiri Pooling Station – 2XD/C 1000 1000 Khammam Khammam – Hyderabad 2XD/C 1000 1000 Tuticorin Pooling station–Salem D/C 738 738 Pooling station Salem – Madhugiri S/C 221 221¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 913 Nagapattinam Pooling Station – D/C 534 534 Salem Salem – Madhugiri 765 kV S/C S/C 230 230 line – 2 (line-1 planned with Tuticorin LTOA projects) Madhugiri-Narendra D/C 700 700 Khammam- Hyderabad 2xD/C 1000 1000 Hyderabad- Wardha D/C 800 800 Narendra - Kolhapur D/C 500 500 Srikakulam PP- Vemagiri-II D/C 700 700 Srikakulam PP- Angul D/C 750 750 765kV Substations in At the end At the end Planned Expected at end Southern Region of 10th of 11th for 12th / of 12th / early 13th Plan Plan early 13th Plan Plan (values in MVA) Raichur 3000 3000 Nellore 3000 3000 Kurnool 3000 3000 Tuticorin pooling point 3000 3000 Tiruvalam 3000 3000 Salem 3000 3000 Madhugiri 3000 3000 Nagapattinam Pooling Station 3000 3000 Srikakulam 3000 3000 Vemagiri(New Pooling Station) 6000 6000 Khammam(New Pooling Station 3000 3000 Hyderabad(New Pooling Station 3000 3000 7.12.6 Eastern Region - 765kV Transmission system: 765kV Transmission lines in Type At the end At the end Planned Expected at end of Eastern Region of 10th of 11th for 12th / 12th / early 13th Plan Plan early 13th (values in ckm) Plan Plan Gaya-Sasaram S/C 148 148 Angul PS – Jharsuguda PS 2xS/C 424 424 Angul PS – Jharsuguda PS D/C 430 430 Tilaiya - Gaya S/C 67 67 Gaya- Balia S/C 228 228 Tilaiya-Balia (on ckt to be D/C 300 300 LILOed at Gaya) D/c line Ranchi – Bilaspur (WR P.S.) 2xS/C 796 796 LILO of Ranchi – Bilaspur D/C 80 80 (WR P.S.) at Dharamjaigarh Ranchi – Dharamjaigarh D/C 360 360914 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Dharamjaigarh – Jharsuguda D/C 152 152 765kV Substations in At the end At the end Planned Expected at end of Eastern Region of 10th of 11th for 12th / 12th / early 13th Plan Plan early 13th Plan Plan (values in MVA) Sasaram 3000 3000 Ranchi 3000 3000 Gaya 3000 1500 4500 Gaya (Augmentation) 1500 1500 Angul 6000 6000 Angul (augmentation) 1500 1500 Jharsuguda 3000 3000 7.13 HVDC TRANSMISSION SYSTEMS PLANNED FOR 12TH PLAN/ EARLY 13TH PLAN 7.13.1 During 11th Plan, one pole of Balia-Bhiwadi 2500 MW HVDC Bipole and upgradation of Talcher- Kolar Bipole by 500 MW has been completed. Another HVDC bipole as Dedicated Transmission line, i.e. Mundra-Mohindergarh 2500 MW is being constructed under private sector by Adani group. This line was completed in 11th Plan period. Three more HVDC systems have been planned for completion during 12th Plan or early 13th Plan. These are Biswanath Chariyali – Alipurduar - Agra (6000 MW), Champa-Kurukshetra Phase-I (3000 MW) and Raigarh-Dhule (4000 MW). Growth of HVDC system, both in terms of MW capacity of HVDC terminals as well as length of HVDC bipoles is depicted below: HVDC Bipoles (ckm) HVDC System HVDC Terminal Capacity (MW) 35000 30000 25000 20000 15000 10000 5000 0 At the end of 10th Plan At the end of 11th Plan Expected at the end of 12th/ early 13th Plan Thus, at the end of 12th Plan/early 13th Plan, it is expected that there would be four HVDC back-to-back and nine HVDC Bipole systems in the National Grid. 7.13.2 Details of HVDC system in India and its plan are given in the following Tables:¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 915 HVDC Transmission Voltage Agency At the At end of Planned Expected at end Lines Existing and level, end of 11th Plan for 12th / of 12th / early 13th Planned kV 10th Plan early 13th Plan Plan (values in ckm) HVDC Bipole Line: Chandrapur-Padghe ± 500kV MSEB 1504 1504 1504 Rihand-Dadri ± 500kV PGCIL 1634 1634 1634 Talcher-Kolar ± 500kV PGCIL 2734 2734 2734 Balia-Bhiwadi ± 500kV PGCIL 1580 1580 Biswanath Chariyali-Agra ± 800kV PGCIL 3600 3600 Champa – Kurukshetra ± 800kV PGCIL 3700 3700 Raigarh(Kotra)-Dhule ±600kV PGCIL 2000 2000 LILO of Bishwanath– ± 800kV PGCIL 140 140 Agra at Alipurduar Mundra - Mohindergarh ± 500kV Adani 1980 1980 New Pugalur- New ± 500kV 1800 1800 Hyderabad TOTAL 5872 9432 11240 20672 HVDC Terminals Type Agency At the At end of Planned Expected at end Capacity (bipole / back- end of 11th for 12th / of 12th / early 13th to-back) Existing and 10th Plan Plan early 13th Plan Planned Plan (values in MW) Chandrapur-Padghe bipole MSEB 1500 1500 1500 Rihand-Dadri bipole PGCIL 1500 1500 1500 Talcher-Kolar bipole PGCIL 2000 2500 2500 Balia-Bhiwadi bipole PGCIL 1250 * 1250 2500 Biswanath-Agra bipole PGCIL 3000 3000 Champa– Kurukshetra bipole PGCIL 3000 3000 Raigarh(Kotra)-Dulhe bipole PGCIL # 4000 4000 LILO of Bishwanath– bipole PGCIL * 3000 3000 Agra at Alipurduar Mundra - Mohindergarh bipole Adani 2500 2500 New Pugalur- New bipole 2500 2500 Hyderabad Sub-total (bipole) 5000 6750 19250 26000 Vindhyachal b-to-b PGCIL 500 500 500 Chandrapur b-to-b PGCIL 1000 1000 1000916 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Gazuwaka b-to-b PGCIL 1000 1000 1000 Sasaram b-to-b PGCIL 500 500 500 Sub-total (b-to-b) 3000 3000 0 3000 TOTAL – HVDC 8000 9750 19250 29000 Terminal Capacity # - Likely to be implemented in 13th plan * - Spill over from 11th plan 7.14 USE OF HIGHER LEVELS OF VOLTAGE FOR TRANSMISSION IN NATIONAL GRID 7.14.1 Use of higher voltage levels results in reducing requirement of right-of-way(RoW) as MW per metre of RoW increases with increase in transmission voltage level. Use of higher voltage levels also results in reducing transmission losses as current in the transmission lines decreases with increase in voltage level. Higher voltage also helps in containing short-circuit levels at lower voltage substations. Indicative figures for various voltage levels are tabulated below: Voltage 132 kV 220 kV 400 kV 765 kV 1200 kV RoW, meters(m) 27 35 46 64 90 Capacity, (MW) 80 170 700 3000 8000 MW/m (approx.) 3 5 15 45 90 7.14.2 1200kV Transmission system In order to increase the power density of the corridor, development of 1200kV AC system as next higher AC voltage level has been decided. As a planning initiative, considering need of higher capacity transmission corridor between Aurangabad and Wardha, the Aurangabad - Wardha 400 kV Quad D/C line which is part of the transmission system for evacuation of power from Mundra UMPP has been planned and designed in such a way that this line would be converted into a 1200kV S/C line at a later date. As, the 1200kV AC technology is relatively a new one in the world, therefore, to develop this technology indigenously, POWERGRID along with Indian manufacturers is establishing a 1200kV UHVAC Test Station at Bina in the State of M.P.). In this test station, a 1200kV test line (S/c+D/c) is being constructed along with two 1200kV test bays in which the leading manufacturers are providing main equipment like transformers, surge arresters, circuit breakers, CTs, CVTs and transmission line hardware etc. POWERGRID shall provide space, civil foundation, 1200kV line, control & protection system, various testing equipment, auxiliaries & fire protection system, 1200kV bushing etc. These test bays and test line shall be used by the manufacturers and transmission utilities for various field tests so that the results and feedback can be used for developing field proven equipment of 1200kV system in India as well as gain initial operational experience. 7.15 TRANSMISSION SYSTEM FOR ULTRA MEGA POWER PROJECTS(UMPP) 7.15.1 Multi-Regional UMPPs Beneficiaries of power from Ultra Mega Power Projects, each of about 4000 MW capacity, are various States spread over different regions in the country. UMPPs, essentially being multi-regional large capacity projects, their transmission system also spans in more than one region and has contributed to growth of National Grid. Till date transmission systems for four UMPPs have been¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 917 firmed up. These are - (1) Mundra UMPP in Gujarat, (2) Sasan UMPP in Madhya Pradesh, (3) Krishnapattnam UMPP in Andhra Pradesh and (4) Tilaiya UMPP in Jharkhand. Details of beneficiaries along with their allocations are as given under: Sl. Beneficiary Sasan Mundra Krishnapatnam Tilaiya (Jhar.) No. State (MP) (Guj.) (AP) 1. Delhi 450 - - 150 2. U. P. 500 - - 650 3. Uttaranchal 100 - - - 4. Punjab 600 500 - 450 5. Rajasthan 400 400 - 250 6. Haryana 450 400 - 200 7. M.P. 1500 - - 200 8. Chhattisgarh - - - - 9. Gujarat - 1900 - 300 10. Maharashtra - 800 800 300 11. Karnataka - - 800 - 12. Tamil Nadu - - 800 - 13. Kerala - - - - 14. Andhra Pradesh - - 1600 - 15. Orissa - - - - 16. Jharkhand - - - 1000 17. Bihar - - - 500 TOTAL 4000 4000 4000 4000 7.15.2 Transmission systems planned for above UMPPs and their status The Mundra UMPP : The Mundra UMPP is likely to come in 2012-14. The transmission system is being commissioned in phased manner matching with commissioning of the generation Units. Detail of transmission system is given in the Tables (WR-GJ-02, WR-GJ-03, & WR-GJ-09).918 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] The Sasan UMPP: The Sasan UMPP is likely to come in 2012-14. The transmission system is being commissioned in phased manner matching with commissioning of the generation Units. Detail of transmission system is given in the Tables (WR-MP-02, & WR-GJ-09). The Tilaiya UMPP: The transmission system would be matched with commissioning of the generation Units. Detail of transmission system is given in the Tables (ER-JH-05, & ER-JH-06). The Krishnapatnam UMPP: The work on Krishnapatnam UMPP has been suspended by the developer. Due to delay in the generation project, the transmission scheme has been delinked and re-configured. Some elements of the planned transmission system are being taken up ahead of the generation project. Detail of planned transmission system is given in the Tables (SR-AP-03, & SR- AP-04). Future projects – Cheyyur (Tamil Nadu) UMPP, Orissa UMPP and Chhatisgarh UMPP: These projects are yet to take-off as bidding process has not been initiated. Tentative transmission systems have been identified for these projects, however, these are not included in this document. 7.16 EVOLUTION OF HIGH CAPACITY POWER TRANSMISSION CORRIDORS Eleven number of High Capacity Power Transmission Corridors were planned taking into consideration long term optimization for cluster of generation projects mainly located in the States of Orissa, Chhattisgarh, Sikkim, Jharkhand, Madhya Pradesh, coastal Andhra Pradesh and Tamil Nadu. A list of these corridors is given below. These transmission corridors would be commissioned progressively matching with commissioning of IPP generation projects. Transmission system elements constituting these corridors are mentioned in respective associated generation projects under sections 7.5 - 7.8 in this chapter. Corridor wise transmission elements are given under perspective plan in next chapter. i. Transmission System Associated with Phase-I Generation Projects in Orissa ii. Transmission System Associated with IPP projects in Jharkhand iii. Transmission System Associated with IPP projects in Sikkim iv. Transmission System Associated with IPP projects in Bilaspur complex, Chhattisgarh & IPPs in Madhya Pradesh v. Transmission System Associated with IPP projects in Chhattisgarh vi. Transmission System Associated with IPP projects in Krishnapatnam Area, Andhra Pradesh vii. Transmission System Associated with IPP projects in Tuticorin Area, Tamil Nadu viii. Transmission System Associated with IPP projects in Srikakulam Area, Andhra Pradesh ix. Transmission System Associated with IPP projects in Southern Region for transfer of power to other regions x. Transmission System Associated with IPP projects in Vemagiri area in SR for power transfer of other regions xi. Transmission System Associated with IPP projects in Nagapattinam / Cuddalore area in SR for power transfer of other regions 7.17 TRANSMISSION SYSTEM DEVELOPMENT – PROGRAMME FOR 12TH PLAN PERIOD During 12th Plan period, a total of about 107440 circuit kilometers (ckm) of transmission lines, 270000 MVA of AC transformation capacity and 12750 MW of HVDC systems are estimated to be added. Highlights of this transmission expansion are addition of new HVDC Bipole systems and quantum jump in 765kV transmission systems. During 12th Plan about 27000 ckm of 765kV lines and 149000 MVA transformation capacity addition is expected. This huge increase in the 765kV¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 919 system is due to a number of pooling and de-pooling 765/400kV stations that have been planned to evacuate power from cluster of generation projects mainly in pit-head and coastal areas and transfer their power through long distance transmission lines up to load centers in the country. In addition to above, 400kV lines of 45000 ckm, 220kV lines of 35000 ckm and transformation capacity of 45000 MVA and 76000 MVA, respectively is estimated to be added during 12th Plan period. The estimates of 220kV systems are approximate and based on previous trends, which would be firmed up after STUs work out their 12th Plan transmission programmes. There would also be additions in the 66kV, 110kV and 132kV systems. Following Tables give development of the transmission system(of 220kV and above voltage level) in India in 11th Plan period and expected to be added during 12th Plan period. These estimates are considering the 88 GW generation addition scenario for 12th Plan: Transmission Lines (220kV and above system) Transmission Lines At the end Add. in At end of Expected Expected (both AC and HVDC) of 10th Plan 11th Plan 11th Plan addition by end of 12th expected by end of during Plan 12th Plan 12th Plan (values in ckm) HVDC Bipole lines 5872 3560 9432 7440 16872 765 kV 2184 3536 5250 27000 32250 400 kV 75722 37645 106819 38000 144819 220 kV 114629 25175 135980 35000 170980 Total Transmission Line, 198407 69926 257481 107440 364921 ckm Substations (220kV and above system) Substations(AC) and At the end Add. in At the end Expected Expected by end HVDC Terminals of 10th Plan 11th Plan of 11th Plan addition of 12th Plan expected by end of during 12th Plan 12th Plan (values in MVA / MW) HVDC Terminals: HVDC back-to-back 3000 0 3000 0 3000 HVDC Bipole terminals 5000 1750 6750 12750 19500 Total- HVDC Terminal 8000 1750 9750 12750 22500 Capacity, MW AC Substations920 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 765 kV 0 25000 25000 149000 174000 400 kV 92942 58058 151027 45000 196027 220 kV 156497 67277 223774 76000 299774 Total- AC Substation 249439 150362 399801 270000 669801 capacity, MVA 7.18 FUND REQUIREMENT FOR DEVELOPMENT OF TRANSMISSION SYSTEM DURING 12TH PLAN Considering the 88 GW generation addition scenario for 12th Plan, total fund requirement for development of transmission system is estimated to be of the order of Rs 2,00,000 crore. 7.19 INTEGRATION OF RENEWABLE ENERGY SOURCES (RES) GENERATION IN NATIONAL GRID 7.19.1 Integration with National Grid and Electricity market The RES transmission schemes are not stand alone schemes and require to be integrated with State grid and/or regional/all-India grid depending mostly upon quantum of power to be transmitted. Owing to variable nature of RES energy, these also require support from the grid. The integration provides reliability of transmission and grid support to accommodate variability of RES generation to certain extent. Extent of accommodation of variability of RES generation depends upon size, nature and operating practices of grid. In particular, - (i) quantum of RES generation vis-à-vis quantum of conventional sources of energy and their operating characteristics, (ii) generation reserves in the grid, (iii) variability of RES generation, (iv) extent of transmission interconnections (v) grid codes & operating practices of the grid, (vi)balancing mechanism, and (vii)enabling regulations, would determine extent of accommodation of RES into National Grid with no, partial or full back-down under different seasons/load-generation scenarios. Electricity Market in India for RES : India has diversified electricity market in which power is contracted on different type of contracts such as long term, medium term and short term power purchase agreements. There is a day-ahead power exchange. Power is also contracted on barter basis. The Indian Electricity Grid is operated as per the Indian Electricity Grid Code through hierarchy of system operators. There is no central command control system and the decision making is de-centralized with each State/DISCOM being responsible for maintaining its load generation balance. Deviations from the schedule by an entity in real time are settled commercially through UI mechanism. The renewable energy generator would have to interact in the electricity market and find a buyer. It has options to enter into a preferential tariff contract or a market tariff contract with native DISCOM. It has also option to enter into an interstate contract on schedule basis. Since the renewable capacity in the country is being added in a big way and in the years to come the growth is going to be still higher, it is extremely important that a suitable institutional mechanism on the principles of a Registry is devised which may clearly contain the complete information about the renewable capacity, so that any techno-commercial mechanism involving a certain type/part of the capacity based on the date of commencing and/or any other suitable criteria can be implemented smoothly. Variability of RES : Each DISCOM/State is to build a portfolio comprising of power from both conventional and¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 921 renewable energy sources. It is the responsibility of each DISCOM/ State to manage its portfolio or power contracts in an optimal manner and maintain its load-generation balance. Power from renewable energy sources is subject to variability and this impacts the ability of the DISCOM to manage its power purchase portfolio. Variation in the availability of power from renewable energy sources would manifest as over/under drawal in real time at the DISCOM/State boundary. In case SLDCs are unable to enforce backing down of conventional generation in their State under high wind scenario, it will result in very heavy injection into ISTS and may jeopardize grid security. The present allowable frequency range is 49.7 Hz to 50.2 Hz. By the year 2014, the NEW Grid and the SR Grid are expected to be synchronized and a large number of 765 kV lines are also likely to become operational by then across the country. From power system reliability considerations, it is essential to further tighten the frequency band to 49.8 to 50.1 Hz. Important things for integration with grid and market: Adequate transmission: It is important that all parts of the country particularly those with concentrated the renewable energy sources such as wind and solar are connected with very strong intra- state and inter-state transmission system so that there is no congestion on the transmission system in the event of under drawl or over drawl due to failure or excess availability of renewable power. For this, ISTS connectivity and adequate evacuation inter-state system for RE generation shall be provided as per provisions pertaining to RE generation in the connectivity and LTA regulation. Similarly, the States must develop adequate Intra State transmission system for dispatch of RE power and not piggy ride the ISTS. In case of excess renewable power, the States must be willing to shut-down/run on partial load their conventional /thermal power stations. Additional ISTS connectivity may be provided through State’s grid for reliability and grid support. Forecasting and scheduling: At the same time, it is also important to have the latest forecasting tools to predict wind and solar power, farm-wise and cluster-wise, with greater accuracy so that pre- planned action can be taken by the utilities and impact on the grid due to variation of renewable energy is minimized. This would help wind / solar forms to schedule their power with more certainty. This is important from the point of view of both inter-state and intra-state sale of power. IEGC has special dispensation for inter-state scheduling of RE power. Energy accounting: It is essential that all the states utilities take urgent measures for installation of the interface meters at the interconnecting points and account for the energy injection and deviation at the intra-state boundaries. Load-generation balance: The renewable power contribution is going to become very large in the future and its variation may not be possible to be accommodated through UI mechanism. Under such circumstances a suitable strategy has to be devised to accommodate sudden variations in the fall of grid power through the intervention such as running a storage type hydro stations or gas turbines or operating demand management contracts in the event of frequency falling down abnormally. The SLDCs of renewable rich States would have to play a proactive role in maintaining load-generation balance of their State. Energy storage: Eventually, it would be desirable for the renewable rich States to introduce energy storage devices/other alternative options to effectively maintain a reasonable load-generation balance. Registry for RES: It is extremely important that a suitable institutional mechanism on the principles of a Registry is devised which may clearly contain the complete information about the renewable capacity, so that any techno-commercial mechanism involving a certain type/part of the capacity based on the date of commencing and/or any other suitable criteria can be implemented smoothly. 7.19.2 Planning connectivity for RES generation with grid922 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] The transmission planning for renewable energy generation projects has to be done on case to case basis depending upon topology of the local grid, spatial distribution of renewable sources and the total quantum of power to be evacuated. Some of the States have abundant renewable energy sources, while others are deficit. In case of large scale renewable generation it is not possible to absorb the energy locally, particularly during off peak hours, and a transmission system is required to be planned integrating renewable generation with the state grid as well as with inter-state grid. Integration of RES with National Grid would help in lessening backing down of conventional generation during periods of high RES generation and meeting demand of local load centres when renewable generation is not available, provided there is enough dispatchable surplus generation in other parts of the grid. As most of the renewable energy source (RES) generation in terms of MW are smaller in size their first connection with the grid is normally done at 11kV, 22kV, 33kV or 66kV. The EHV transmission system beyond first connection point is either at 110kV, 132kV, 220kV or 400kV depending on the quantum power being pooled at EHV substations. 7.19.3 Technical standards for integration of RES with National Grid CEA is in the process of issuing draft amendment to connectivity standards specifying the technical requirements from wind generators to be synchronized with the grid, as per which, generating stations shall be capable of supplying dynamically varying reactive power support so as to maintain power factor within limits of 0.95 lagging to 0.95 leading. Also, the generating stations shall have fault ride through capability of not less than 300 milli-seconds so that grid is not destabilized due to sudden outage of renewable generation in the event of a grid disturbance. Standards for maximum harmonic distortion are also being specified in the draft technical standards. 7.19.4 Regulations for integration of RES with National Grid CERC has amended Indian Electricity Grid Code to allow flexibility to wind and solar plants in scheduling and dispatch. As per CERC (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-state transmission and related matters) Regulation 2009, a group of generating stations using renewable sources with capacity between 50 MW and 250 MW can also apply to the CTU for direct connectivity with inter-state transmission system. Transmission charges for transfer of power from RES shall be as per the applicable CERC tariff norms. In case of solar plants which are to be commissioned by 2014, ISTS charges/losses are exempted. Wind and solar generation developers can take advantage of the above provisions and get themselves connected with ISTS for improved reliability of evacuation of power from their projects and selling the renewable energy on all-India basis in through National Grid. 7.19.5 Transmission systems for integration of RES during 12th Plan The renewable generation capacity addition in the country, up to the end of 9th Plan i.e. 2001-02 was just 3,475 MW. The Government of India as well as many State governments have issued policies and programmes conducive to the generation of renewable power, which gained acceleration and is going to cross 20,000 MW by the end of 11th Plan (i.e. March 2012). Most of this renewable capacity is in the renewable potential rich states of Tamil Nadu, Maharashtra, Karnataka, Gujarat and Rajasthan. These five states at present contribute more than 80% of total renewable capacity installation in the country. For the 12th Plan period (2012-17) RES addition is being estimated in the range of 19000 – 30000 MW. The State Transmission Utilities of renewable rich states of Himachal Pradesh, Rajasthan, Gujarat, Maharashtra, Tamil Nadu and Andhra Pradesh have prepared transmission plans for RES generation projects in their States. CEA in association with some of the these STUs have examined/examining these proposals and these are likely to be firmed up along with other stakeholders as per planning process. The transmission system that has been firmed up till date is given in Annex 7.6 of this chapter. This system is planned for implementation during 12th Plan period. Though, all of these RES capacity additions are planned to meet RPO(renewable purchase obligation) requirements of respective States, care is being taken to integrate them also with ISTS directly/indirectly so that they become part of National Grid as explained in above¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 923 paragraphs. Total capacity of RES for which transmission planning exercise is under progress is of the order of 25000 MW (Tamil Nadu – 6000 MW, Andhra Pradesh – 3000 MW, Gujarat – 5500 MW, Maharashtra – 5000 MW, Rajasthan – 2800 MW, Karnataka – 1600 MW and Himachal Pradesh 600 MW). It is learnt that Ministry of New and Renewable Energy (MNRE) is assessing quantum and location of RES generation additions for 12th Plan period (which are in the 19000-30000 range). A comprehensive plan for these projects can be worked out after this assessment. For future RE projects, a tentative perspective plan considering potential for harnessing of mainly wind and solar power is given in next Chapter. 7.20 TRANSMISSION EXPANSION ASSESSMENT FOR 13TH PLAN As explained above, transmission system for a number of generation projects have been planned under the LTA process, majority of which are expected to materialize during 12th Plan and the rest would be implemented during 13th Plan depending upon actual progress of the generation project. Based on progress and development of generation projects and transmission system during 12th Plan, some of the already planned transmission systems would have to be reviewed. This review would be carried out alongwith planning for new transmission requirements for specific generation projects coming in 13th Plan. Under such scenario, only a broad assessment of transmission capacity addition for 13th Plan can be made considering probable load growth and indicative generation capacity addition scenarios for 13th Plan. Accordingly, following assessment has been made for transmission capacity addition during 13th Plan period: Transmission capacity addition for 13th Plan (220kV and above system): 1. Transmission lines : 130 Thousand ckm 2. Substation (Transformation) Capacity : 300 Thousand MVA 3. Fund requirement : Rs 200,000 Crore **********924 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4]¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 925 CHAPTER – 7A ANNEX - XII PLAN TRANSMISSION PROGRAMME ANNEX – 7.1 NORTHERN REGION –TRANSMISSION SCHEME DETAILS Northern Region – System Strengthening Schemes: Table No: NR-IS-01 765kV system for Central Part of Northern Grid- 1. Agra - Meerut 765 kV S/c Part-I 2. Agra - Jhatikra 765 kV S/c 3. Jhatikra - Bhiwani 765 kV S/c 4. Bhiwani – Moga 765 kV S/c 5. LILO of both circuits of Mundka/Bawana – Bamnouli at Jhatikra Table No: NR-IS-02 765kV system for Central Part of Northern Grid- 1. Agra Substation extension Bay extension Part-II 2. Establishment of 765/400/220 kV substation at Jhatikra with 4x1500MVA 765/400 kV 3. Augmentation of Moga & Meerut 400/220 kV substation to 765/400/220 kV susbtation with 2x1500MVA transformation capacity 4. 240 MVAR Bus reactor at Jhatikra Table N o: NR-IS-03 765kV system for Central Part of Northern Grid- 1. Meerut – Bhiwani 765 kV S/c Part-III 2(a). Establishment of 765/400/220 kV substation at Bhiwani with 2x1000MVA 765/400 kV ICT 2(b). Establishment of 2x315 MVA 400/220 kV ICT at Bhiwani 3. LILO of both circuits of Bawana/Bahadurgarh-Hissar 400 kV D/c at Bhiwani 4. LILO of both circuits of Bareilly-Mandaula 400 kV D/c at Meerut 5. Mandaula Bus splitting 6. Ballabhgarh Bus splitting Table No: NR-IS-04 NR System Strengthening Scheme-XIX 1. LILO of both circuits of Meerut – Kaithal 400 kV D/c (Quad HSIL) to create new 400/220 kV S/s at Bagpat 2. Bagpat 400/220 kV GIS s/s with 2x500 MVA transformation capacity 3. 80 MVAR Bus Reactor at Kaithal 4. 125 MVAR Bus Reactor at Bagpat Table No: NR-IS-05 NR System Strengthening Scheme-XX 1. LILO of one circuit of Parbati PS – Amritsar 400 kV D/c to create new 400/220 kV S/s at Hamirpur 2. Hamirpur 400/220 kV s/s with 2x315 MVA transformation capacity Table No: NR-IS-06 NR System Strengthening Scheme-XXI 1. Lucknow – Bareilly 765 kV S/c (ckt-I) 2. Bareilly–Kashipur 400 kV D/c (quad) 3. Kashipur–Roorkee 400 kV D/c (quad) 4. Roorkee–Saharanpur 400 kV D/c (quad) 5. Establishment of new 765/400 kV, 2x1500 MVA substation at Bareilly 6. Bareilly – Bareilly 400 kV 2xD/c (quad) Table No: NR-IS-07 NR System Strengthening Scheme-XXII 1. Kishenpur – Samba 400 kV D/c 2. Dulhasti – Samba 400 kV S/c926 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 3. Establishment of new 400/220 kV, 2x315 MVA substation at Samba Table No: NR-IS-08 NR System Strengthening Scheme-XXIII 1. Augmentation of 400/220 kV transformation capacity by 2x500 MVA at Maharanibagh 2. Augmentation of 400/220 kV transformation capacity by 1x500 MVA at Lucknow 3. Augmentation of 400/220 kV transformation capacity by 1x500 MVA at Bahadurgarh Table No: NR-IS-09 NR System Strengthening Scheme-XXIV 1. Dehradun – Abdullapur 400 kV D/c (Quad) 2. Dulhasti – Kishenpur 400 kV D/c (Quad) – Single Circuit Strung 3. 2 nos. of 63 MVAR line Reactors (one on each ckt) on Barh – Balia 400 kV D/c line at Balia end Table No: NR-IS-10 NR System Strengthening Scheme-XXV 1. Jaipur-Bhiwani 765kV S/c (2nd Ckt) 2. Bhiwani(PG)-Hissar 400kV D/c line 3. LILO of 400kV D/c Moga-Bhiwadi line at Hissar Table No: NR-IS-11 NR System Strengthening Scheme-XXVI Meerut-Moga 765kV S/c line Table No: NR-IS-12 NR System Strengthening Scheme-XXVII 1 LILO of 400kV Dehar-Panipat S/c line at Panchkula 2 LILO of 400kV Dehar-Bhiwani S/c line at Rajpura 3. TehriPP-Srinagar 400kV D/c line (Quad) 4. one 400kV line bay at Kota(PG) for terminating Anta - Kota 400kV S/c line 5. Two 220kV line bays at Chamera pooling point Table No: NR-IS-13 NR System Strengthening Scheme-XXVIII 1. Extend one 400kV D/c (Quad) Biharsharif-Sasaram line to Varanasi,Bypassing Sasaram 2. LILO of Gaya-Fathepur765 kV S/c line at Varanasi 3. Sasaram-Allahabad Circuit may be from ER bus 4. Sasaram-Saranath 400kV S/c may be through HVDC back to Back Table No: NR-IS-14 NR Bus Reactor Schemes 1. 125 MVAR bus reactor at Gorakhpur 2. 125 MVAR bus reactor at Allahabad 3. 125 MVAR bus reactor at Mainpuri 4. 125 MVAR bus reactor at Hissar 5. 125 MVAR bus reactor at Jullandhar 6. 125 MVAR bus reactor at Kankroli 7. 125 MVAR bus reactor at Nallagarh 8. 2X125 MVAR bus reactor at Vindhyachal(NR Bus) 9. 80 MVAR bus reactor at Amritsar Table No: NR-IS-15 System Strengthening in NR 1. Lucknow – Bareilly 765kV S/c line (ckt-II) (after delinking the scheme with North 2. Bareilly – Meerut 765kV S/c line Karanpura Project) 3. Agra – Gurgaon 400kV D/c line(quad) 4. 2x500 MVA ,400/220kV S/S at Gurgaon Table No: NR-IS-16 Inter-connection between Srinagar (Uttrakhand) Srinagar-Tehri Pooling station 400 kV D/C (Quad) and Tehri Northern Region – Evacuation Schemes: Table No: NR-JK-01 Kishen Ganga (330MW) 1. Kishenganga – Alistang 220kV 2XD/c line (Central sector) 2. Alistang – New Wanpoh 220 kV D/c line 3. Kishenganga- Amargarh 220kV D/c line¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 927 Table No: NR-JK-02 Baghalihar II (450 MW) LILO of one ckt of 400kV Kishenpur-New Wanpoh D/c line at (State Sector) Baghlihar HEP Table No: NR-HP-01 Parbati-II (800MW) (Central Sector) 1 Parbati II-Koldam (Quad) 400kV 1st ckt 2 Parbati II-Koldam (Quad) 400kV 2nd ckt 3 Parbati II- Koldam (Quad) D/c portion Tabl e No: NR-HP-02 Rampur (412MW) (Central Sector) 1. LILO of 400 kV D/c Nathpa Jhakri - Nalagarh at Rampur 2. Ludhiana - Patiala 400kV D/c line 3. LILO of 400kV D/c Patiala -Hissar line at Kaithal Table No: NR-HP-03 Koldam (800MW) (Central Sector) 1. Koldam-Ludhiana 400kV D/c 2. Koldam-Nalagarh (Quad) 400kV D/c line Table No: NR-HP-04 Tidong-I (100 MW) (Private Sector) Tidong-I HEP- kashang 220kV D/c line T able No: NR-HP-05 Sorang(100 MW) (Private Sector) LILO of S/c Karcham Wangtoo - Abdullapur at Sorang Tabl e No: NR-HP-06 UHL-III(100MW) Evacuation at lower voltage (Private Sector) Table No: NR-HP-07 Kashang I, II, III (3x65 MW) Kashang- Jangi Pooling Station 220kV D/c (State Sector) line Table No: NR-HP-08 Sawara Kuddu (110 MW) LILO of Nathpa Jhakri-Abdullapur 400kV (State sector) D/c line at Sawara kudu Table No: NR-HP-09 Kutehr (260MW) (Private Sector) 1. Establishment of 400/220 kV ,2x315 MVA S/S at Lahal 2. Kutehar -Lahal 220 kV D/C line 3. Lahal PS - Chamera PS 400 kV D/C line Table No: NR-HP- 10 Bajoli Holi HEP(180 MW) HPPTCL system upto Chemera Pooling point (connectivity) Table No: NR-HP-11 Kunihar (Andhra+Nogli+Micro) (196 MW) (Private Sector) Evacuation at lower voltage Table No: NR-HP-12 Sainj(100 MW) 1. Sainj-Sainj Village(HPPTCL) 132kV D/c (State Sector) line 2. LILO of 400kV Parbathi-II- Parbathi pooling point S/c line 3. Establishment of Sainj 400/132kV S/s (150 MVA) Table No: NR-PB-01 Nabha - Rajpura TPS(2x700 MW) (Private Sector) 1. Creation of 400/220 kV S/S near Nabha/Patiala with 2X315 MVA Transformer 2. Muktsar -substation near Jullundhur 400 kV D/C via Tarantaran 3. Creation of 400/220 kV S/S near Tarantaran 4. Nabha/Patiala - S/S near Jullundhur 400 kV D/C via Mohali 5. Creation of 400/220 kV S/S near Mohali 6. Interconnection between 400 kV S/S near Jullundhur to Jullundhur S/S (PG)928 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 7. Interconnection between 400 kV S/S near Taran Taran to Amritsar S/S (PG) Table No: NR-PB-02 Talwandi Sabo (3x660 MW) 1. Talwandi Sabo - Muktsar 400kV D/c line (Private Sector) 2. Muktsar - Patti – Nakodar 400kV D/c line 3. Talwandi Sabo - Dhuri 400kV D/c line 4. Talwandi Sabo - Nakodar 400 kV D/C (one ckt to be LILOed at Moga 400kV PGCIL s/s) 5. Establishment of 2X315 MVA Muktsar S/s 6. Establishment of 2X315 MVA Patti S/s 7. Establishmnet of 2X315 MVA Nakodar S/s Table No: NR-PB-03 Govindwal Saheb (2x270 MW) 1. Gowindwal sahib- Ferozpur 220kV D/C (Private sector) 2. Gowindwal sahib- Khasa (Amritsar) 220kV D/C 3. Gowindwal sahib- Sultanpur Lodhi 220kV D/C 4. Gowindwal sahib- Kapurthalahasa 220kV D/C Table No: NR-RJ-01 RAPP D(2x700MW) 1. RAPP–Jaipur (South) 400kV D/c line of which one ckt. to be (Central Sector) LILOed at Kota 2. RAPP – Shujalpur (WR) 400kV D/c line 3. 1x63MVAR at RAPP end of RAPP-Jaipur S/c line 4. 1X50 MVAR at RAPP end of RAPP-Shujalpur D/ c line(each Ckt) 5. 125 MVAR bus reactor at RAPP-D Generation Table No: NR-RJ-02 Ramgarh-II (160 MW) 1. Ramgarh- Dechu 220kV D/c line (commissioned) (State Sector) 2. Dechu – Tinwari 220kV S/c line 3. Dechu – Phalodi 220kv S/c line 4. 220/132kV S/S at Dechu(new) (2x100MVA) Table No: NR-RJ-03 Composite Power Evacuation System for Chhabra St-II( 500MW) and Kalisindh TPS( 2x600 MW) System at 765kV voltage level 1. Phagi (Jaipur South) 3000 MVA, 765/400kV S/S along with two sets of 765kV, 3x80 MVAR line reactors and 400kV 1x125 MVAR bus reactor 2. 400/765 kV GSS at Anta (Baran) pooling Station with with two sets of 765kV, 3x80 MVAR line reactors 3. Anta – Phagi (Jaipur South) 765kV 2xS/c line System at 400kV voltage level 1. 400/220kV S/S GSS at Ajmer 2. Kalisindh – Anta Pooling Point at 400kV D/C (quad) line (for Kalisindh TPS) 3. Chhabra – Anta Pooling Point at 400kV D/C (quad) line(for Chhabra TPS) 4. Phagi (Jaipur south ) – Ajmer 400kV D/C line 5. Phagi (Jaipur south ) –Heerapura 400kV D/C line System at 220kV voltage level 1. LILO of 220kV Ajmer – Beawer line at Ajmer(400/220kV) GSS. 2. LILO of 220kV Ajmer – Kishangarh line at Ajmer(400/220kV) GSS. 3. Kalisindh – Jhalawar 220kV D/C line (for Kalisindh TPS) Table No: NR-RJ-04 Barsingsar Ext(250MW) 1. Barsingsar- Nagaur 220kV S/c line (Central sector) 2. Barsingsar-Khinvsar- Bhopalgarh 220kVS/c line with S/S at Khinvsar (Nagaur) 3. Establishment of Khinvsar 220/132kV substation Table No: NR-RJ-05 Shree Cement Ltd (300 MW) 1. LILO of one ckt of Kota – Meria 400kV D/c line at generation (IPP) switchyard with 80 MVAR bus reactor (connectivity)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 929 Table No: NR-UK-01 Tapovan Vishnugarh(520MW) 1. Tapovan Vishnugarh HEP- Kunwaripaas 400kV D/c line (Central sector) 2. LILO one ckt of Vishnu Prayag – Muzaffarnagar 400 kV D/c line at Kuwanri Pass 3. Kunwari Pass - Karanprayag 400kV D/c line 4. Karanprayag - Srinagar line 400kV D/c line 5. LILO of Kunwari Pass – Srinagar 400kV D/c line at Karanprayag Table No: NR-UK-02 Singoli Bhatwari (99 MW) LILO of Baramwari – Srinagar 220kV D/c line at Singoli (Private sector) Bhatwari Table No: NR-UK-03 Phata Byong (76 MW) 1. LILO of Gaurikund Rambara -Barambari 132kV S/c at Phata (private Sector) Byong 2. Baramwari-Srinagar 220kV D/c line Table No: NR-UK-04 Dhauli Ganga +Rupsiyabagar 1. Dhauli Ganga – Pithoragarh 220kV D/c line Khasiyabara (260MW) 2. Dhauli Ganga – Bareili 220kV D/c line (Central Sector) Table No: NR-UK-05 Kotlibhel St-1A & B 1. Kotli Bhel IA – Dehradun (PTCUL) 220 kV D/C twin/quad (515 MW), Kotlibhel St-II (530 MW) line via Kotli Bhel II (Twin up to Kotli Bhel II and quad (central Sector) between Kotli Bhel II – Dehradun (PTCUL)) 2. LILO of one circuit of Kotli Bhel IA – Dehradun (PTCUL) 220 kV D/C line at Kotlibhel 1B 3. Connectivity between 220kV Dehradun s/s of PTCUL and 400/220kV Dehradun s/s of PG. This would be either through extended bus or through 220kV quad D/C line depending on location of the two s/s being contiguous or otherwise 4. Dehradun-Abdullapur 400 kV D/C line as regional scheme for Kotlibhel HEP Table No: NR-UK-06 Tehri-II(1000MW) 1. Tehri PSP – Tehri Pooling Point (quad) 400kV S/c line (Central Sector) 2. Charging Tehri Pooling Point – Meerut line at 765kVS/c line 3. Establishment of 765/400 kV, 3x1500 MVA S/S at Tehri Pool (Due to Space constraints, Tehri Pooling stn. would be GIS) 4. 765/400 kV, 1x1500 MVA substations at Meerut Modification of Series Capacitors for operation at 765 kV level at Meerut Table No: NR-UK-07 Lata Tapovan (171 MW) (Central Lata Tapovan - Joshi Math 220kV D/c line Sector) Table No: NR-UK-08 Pala Maneri (480 MW) LILO of Lohari Nagpala – Koteshwar 400kV D/c line at Pala (State Sector) Maneri Table No: NR-UK-09 Sravanthi Energy Private ltd. (450 MW) LILO of one circuit of Kashipur –Roorkee 400kV D/c line at Generation Switchyard Table No: NR-UK-10 Srinagar (330 MW) 1. Srinagar - Kashipur 400kV D/c line (Private Sevtor) 2. Srinagar-HEP - Srinagar 400kV D/c line 3. LILO of Visgnuprayag-Muzaffarnagar 400kV line at Srinagar Table No : NR-UP-01 Combined system for Rihand STPP-III (2X500 MW) & Vindhyachal 1. Rihand-III- Vindhyachal Pool STPP -IV (2X500 MW) of WR (Central Sector). 765 kV D/c(initially to be operated at 400 kV) 2. Vindhyachal-IV - Vindhyachal Pool 400 kV D/c (Quad)930 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 3. Vindhyachal Pool-Satna 765 kV 2xS/c 4. Satna - Gwalior 765 kV 2xS/c 5. Gwalior - Jaipur(South) 765 kV S/c 6. Vindhyachal Pool-Sasan 765 KV S/c 7. Establishment of 765/400kV, 2x1500 MVA S/s at Vindhyachal Pool Table No: NR-UP-02 Singrauli St-III (500MW) 1. Singrauli –Allahabad 400kV S/C line 2. Allahabad –Kanpur 400kV D/C line Table No : NR-UP-03 Combined system for Bara TPS(3X660MW) (Private Sector), 1 . S t e p - u p of Bara generation to Karchana (2x660MW) (Private Sector) & 765kV Meja JV(1320MW) (Central Sector) 2. Bara switchyards to have 765kV and 400kV levels with 2x1500MVA (7x500 MVA, 1 phase units) 765/400 ICTs. 3. Establishment of 400kV substation at Reewa Road Allahabad with 400/220kV 2x315 MVA ICTs 4. Step-up of Karchana and Meja generation to 400kV 5. LILO of 400kV Obra-Panki line at Reewa Road Allahabad 6. Meja – Bara 400kV quad D/C line 7. Meja – Reewa Road (Allahabad) 400kV quad D/C line 8. Karchana – Bara 400kV quad D/C line 9. Karchana – Reewa Road Allahabad 400kV quad D/C line 10. Bara-Mainpuri 765kV 2xS/C lines 11. Mainpuri – G.Noida 765kV S/C 12. LILO of Agra - Meerut 765 kV S/C line of PGCIL at G. NOIDA 13. Hapur – G.Noida 765kV S/C line 14. New 765/400kV substation at Maipuri with 2x1000MVA ( 7x333 MVA, 1 phase units) ICTs 15. Mainpuri 765kV UPPCL – Mainpuri 400kV PGCIL 400kV quad D/C line 16. New 765/400 substation at G.Noida with 2x1500MVA (7x500MVA, 1 phase units) 765/400kV¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 931 17 2x500MVA 400/220kV ICTs at New 765/400kV substation at G.Noida 18. Reewa Road Allahabad – Banda 400kV quad D/C line 19. Banda – Orai 400kV quad D/C line 20. Orai – Mainpuri 765kV UPPCL 400kV quad D/C line 21. Establishment of 400kV substation at Banda with 400/220kV 2x315 MVA ICTs 22. Establishment of 400kV substation at Orai with 400/220kV 2x315 MVA ICTs 23. Meja-Allahabad(PG) 400kV D/c line 24. Unnao-Mainuri 765kV S/c line 25. Mainpuri-Hapur 765kV S/c line Table No : NR-UP-04 Lalitpur TPS (3x660 MW) 1. Lalitpur – Bhognipur –I 765kV (State Sector) S/C line (200km) (tentative) 2. Lalitpur – Agra 765kV S/C line (470km) 3. Agra (UP)- agra(PG) 765kV S/C line (50km) 4. Lalitpur 765/220kV S/S (2x300) MVA 5. Jhasi- Lalitpur – lalitpur switchyard 220kV D/C line (2x50 km) Table No : NR-UP-05 Anpara D (1000 MW) 1. Anpara B-Anpara D 400kV D/C (State Sector) lne 2. Anpara C-Anpara D 765kV S/c line 3. Anpara D- Unnao 765kV S/C line 4. Anpara D 765/400kV S/S (2x600+1000) MVA ******932 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ANNEX – 7.2 WESTERN REGION –TRANSMISSION SCHEME DETAILS Western – System Strengthening Schemes: Table No : WR-IS-01 Establishment of 400/220kV S/s in UT DNH 1. LILO of both circuits of Vapi –Navi Mumbai 400 kV D/c at proposed Kala S/s in UT DNH 2. Establishment of 400/220kV, 2x315 MVA S/s at proposed Kala S/s in UT DNH (GIS) Table No : WR-IS-02 Establishment of 400/220kV S/s in UT 1. LILO of both ckts of Navsari - Boisari 400 kV D/c line at Daman Magarwada S/s 2. Establishment of 400/220kV, 2x315 MVA S/s at Magarwada S/s (GIS) Table No : WR-IS-03 Split Bus arrangement and 1. Splitting 400kV Raipur bus into two sections between reconfiguration/shifting of terminating existing line bays of Chandrapur-1 & Chandrapur-2 lines at Raipur 400kV S/s through bus sectionaliser. 2. Bypass 400kV Bhatapara-Raipur-Bhilai line at Raipur and restore the line as 400kV Bhatapara-Bhilai S/c 3. Shifting of Chandrapur-2 and Chandrapur-3 line bays from Section Raipur-B to Raipur-A. Western – Evacuation Schemes: Table No : WR-GJ-01 KAPP Extn U-3,4,(1400MW)(Central 1. Kakrapar NPP-Navsari 400kV D/C line sector) 2. Kakrapar NPP-Vapi 400kV D/C line Table No : WR-GJ-02 Transmission System for Mundra UMPP 1. Mundra – Bachchau-Ranchodpura 400 kV (Triple snowbird) (4000MW) (Private Sector)-Part-A D/c 2. Mundra - Jetpur 400 kV (Triple snowbird) D/c 3. Mundra – Limbdi 400 kV (Triple snowbird) D/c Table No : WR-GJ-03 Transmission System for Mundra 1. Gandhar-Navsari 400 kV D/C UMPP (4000MW) (Private Sector)-Part- 2. Navsari-Boisar 400 kV D/C B (Strengthening in WR) 3. Wardha-Aurangabad 400 kV (Quad) D/c (with provision to upgrade at 1200 kV at later date) 4. Aurangabad-Aurangabad (MSETCL) 400 kV D/C quad 5. LILO of both circuit of Kawas-Navsari 220 kV D/C at Navsari (PG) 6. Bachchau 400/220 kV 2x315 MVA 7. Navsari GIS 400/220 kV , 2x315 MVA 8. Wardha 765/400 kV , 3x1500 MVA 9. Aurangabad(PG) 400/220 kV 2x315 MVA 10. Extn. 765 kV at Seoni and Wardha S/s 11. Extn. 400 kV at Limbdi S/s 12. Extn. 400 kV at Ranchodpura S/s 13. 40% Fixed Series compensation each on Wardha - Aurangabad 400 kV D/c at Wardha end. Table No : WR-GJ-04 Pipavav Energy (1200 MW) 1. Pipavav TPS- Pirana 400 kV D/c line(Triple) along with 1X125 (Private Sector) MVA bus reactor at Pipavav 2. Pirana –Dehgam 400 kV D/c line (2nd) 3. Installation of 1X315 MVA , 400/220 kV ICT(3rd) at Pirana Table No : WR-GJ-05 Dhuvaran EXT.(360 MW) 1. LILO of Kasor-Vartej 220 kV S/c line at Dhuvaran (State Sector) 2. LILO of Karamsad-Vartej 220 kV S/c line at Dhuvaran Table No : WR-GJ-06 Bhavnagar(2X250 MW) 1. BECL - Botad 220 kV D/C line¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 933 (State Sector) 2. BECL - Sagapara 220 kv D/C line 3. LILO of Sarvakundla - Vartej 220 kV line at BECL Table No : WR-GJ-07 Sikka Ext.(2X250MW) 1. Sikka - Moti Paneli 220 kV D/C line with Al 59 cond. (State Sector) 2. LILO of bot ckt. of Jamnagar - Jetpur 220 kV D/C line at Sikka Table No : WR-GJ-08 Pipavav CCPP(2x351 MW) GSECL 1. PipavavTPS- Dhokadva 220kV D/c line (State Sector) 2. LILO of both Savarkundla – Mahva220kV lines at Pipavav(GPPC) 3. Mahuva – Sagapara 220kV D/C line Table No : WR-GJ-09 System Strengtheing in NR associated 1. Agra-Sikar 400kV D/c (Quad) line with Sasan & Mundra UMPP 2. Sikar-Jaipur (POWERGRID) 400kV D/c line 3. Sikar-Ratangarh 400kV D/c line 4. LILO of both circuits of Sikar (RVPNL)-Ratangarh(RVPNL) 220 kV D/c line at Sikar(POWERGRID) 5. LILO of both Ckts of NathpaJhakri-Abdullahpur 400kV D/c at Panchkula 6. Establishment of new 400/220kV substation with 2x315 MVA transformation capacity at Sikar. 7. Establishment of new 400/220kV substation with 2x315 MVA transformation capacity at Panchkula. 8. Sasaram-Fathehpur 765kV S/c line Table No : WR-GJ-10 Ukai Extn. (GSECL) 500 MW (State 1. LILO of 400 kV Asoj- Ukai at Kosamba D/C Sector) 2. Ukai –Kosamba 400kV D/C line 3. Kosamba – Chornia 400kv D/C line 4. Kosamba – Jagadia 220kV D/C line Table No : WR-GJ-11 Wanakbori TPS (GSECL) 500 MW 1. LILO of one ckt of400 kV Wanakbori – Soja line at (State Sector) Dehgam(PG) 2. Soja- Zerda 400kV D/C line 3. Wanakbori Sw. Yard- Wanakbori(existing) 400kV D/C line 4. Wanakbori- Soja 400kV D/c line Table No : WR-GJ-12 Shapoorji Pallonji Energy Ltd.(SPEL) 1. SPEL – Pirana 400kV D/c line (1320 MW)(Private Sector) 2. SPEL- Amreli 400kV D/c line Table No : WR-GJ-13 DGEN TPS -Torrent Power Ltd. (1200 1. DGEN TPS – Navsari 400kV D/c (triple snowbird) MW) (Private Sector) 2. DGEN TPS-Vadodara 400 kV D/C (twin Moose) 3. Navsari-Bheestan 220 kV D/C line Table No : WR-GJ-14 NTPC Limited (Gandhar-II) Interconnection with the existing Gandhar 400kV bus. (1300 MW)(Central Sector) (connectivity) Table No : WR-GJ-15 NTPC Limited (Kawas-II) LILO of 400kV Kosamba-Vapi D/c at Kawas-II. (1300 MW)(Central Sector) (connectivity) Table No : WR-GJ-16 Gujarat Fluorochemicals Ltd.(GFL) GFL WPP – Bachau(PG) 220kV D/c (Twin Zebra). (300 MW)(Private Sector) (connectivity) Table No : WR-GJ-17 Sintex Power Ltd (1708 MW) Sintex- Pirana 400kV (quad) d/c line (Private sector) (connectivity) Table No : WR-MP-01 Vindhyachal STPP -IV (2X500 1. Rihand-III- Vindhyachal Pool 765 kV D/c line (initially to be MW), operated at 400 kV) Rihand STPP-III (2X500 MW) of 2. Vindhyachal-IV - Vindhyachal Pool 400 kV D/c (Quad) NR 3. Vindhyachal Pool-Satna 765 kV 2xS/c (Central Sector) 4. Satna - Gwalior 765 kV 2xS/c¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 935 SJK Powergen Ltd (1320 MW) (Private Sector) 1. SJK TPS – Jabalpur Pooling Station 400kV D/c along with 1x125MVAR bus reactor (connectivity) Table No : WR-MP-08 Malwa ( Shree Singhji) TPP 1. Malwa TPH - Pithampur 400 kV D/c line (1200MW) (State Sector) 2. Malwa TPH - Julwania 400 kV D/c line (one ckt via Chhegaon) 3. Chhegaon - Julwania 400 kV D/c line 4. Malwa TPH - Chhegaon 200 kV D/c line 5. Pitampur(400kV)- Pitampur(220kV) inter-connection 6. LILO of both ckts of 220kV Nimrani – Julwanai at Julwania400kV S/S Table No : WR-MP-09 Satpura Ext TPP U-10,11 (500MW) 1. Satpura TPH - Ashta 400 kV D/c line (State Sector) 2. Astha – Indore-II(Jetpura) 220kV S/c on D/c 3. Astha New 400/220kv S/s (630MVA) 4. Astha (add transformer) 220/132kV S/S (160 MVA) Table No : WR-MP-10 Essar Power MP Ltd. (Mahan Bus extension of Mahan TPS phase-1 generation project to proposed Phase II) (600 MW) (Private generation project switchyardalong with 1x125MVAR bus rector Sector) (connectivity) Table No: WR-MH-01 Mauda STPS- I (2X500) MW 1. Mauda STPS– Wardha 400 kV D/c (Quad) (Central sector) 2. Extn. Of 400/220 kV Wardha S/s Table No: WR-MH-02 Mauda STPS- II (2X660) MW 1. Mauda -II– Betul 400 kV D/c (Quad) (Central sector) 2. Betul – Khandwa 400kV D/C (quad) 3. Khandwa – Raigarh 400kV D/C (2nd) 4. 400/220 kV ,2x315 MVA S/S at Betul Table No: WR-MH-03 Tiroda Adani Ph-1,Ph –II 1. Tiroda (Gondia) - Warora 400 kV D/c line (quad) (1320MW+1320MW) 2. Tiroda-Koradi III 765 kV 2xS/c line (Private Sector) 3. Koradi-III - Akola-II 765 kV 2xS/c line 4. Akola-II - Aurangabad II 765 kV 2xS/c line 5. 2x1500 MVA, 765/400 kV ICT at Tiroda (Gondia) 6. Aurangabad II-Aurangabad (PG) 765kV S/C(with D/C towers) 7. Aurangabd(II) 765/400 kV Substation with 2x1500 MVA Table No: WR-MH-04 IndiaBulls Realtech Ltd(Nasik) 1. Sinnar – Nasik 400kV D/C Ph- 1& II (5x270 +2x270) MW (Private 2. Sinnar – Bableshwar 400kV D/C line Sector) Table No: WR-MH-05 India Bulls- Amaravati-Nandagaonpet 1. Nandagaonpet-Akola-I 400 KV D/c Line (Quad) Ph- 1& II (5x270 +2x270) MW 2. LILO of Akola-I- Koradi-I 400kV S/c line at Nandgaonpet (Private Sector) Table No: WR-MH-06 Ideal power (Bela TPP) LILO of one ckt of 400 kV Koradi-II - Wardh (PG) at M/s Ideal (540MW) (Private Sector) Energy Table No: WR-MH-07 Dhariwal Infrastructure(600 MW) U-1,2 1. Dhariwal – Chandrapur- II 400kV D/C line (for U -1) (Private Sector) 2. LILO of one ckt of Bhadrawathi(PG) - Parli 400 KV D/c line at Dhariwal TPS (for U -2) Table No: WR-MH-08 EMCO-Warora, Maharashtra (600 EMCO-Bhadrawathi(PG) 400 kV D/c line MW) (Private Sector)936 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Table No: WR-MH-09 Parli (Replacement) U-8 (250MW) 1. Parli-Nanded 220kV D/C line (State Sector) 2. LILO of 220kV Parli GCR-Beed at Parli D/C line Table No: WR-MH-10 Koradi(1980 MW) 1. Koradi-II – Koradi–III 400 kV quad D/C line (State Sector) 2. 7X167MVA,400/220 kV S/s at Koradi-II Table No: WR-MH-11 Chandrapur II TPS (1000MW) 1. LILO of both circuits of Chandrapur - Parli 400kV D/C at (State Sector) Chandrapur-II (that is LILO of 2 circuits out of 3) 2. Chandrapur-II – Warora – Wardha PG 400kV quad D/C 3. 2x500 MVA, 400/220 kV S/s at Chandrapur-II Table No: WR-MH-12 Dhopave(1600 MW) (State Sector) 1. Dhopave – Padghe-II 400kV quad D/C line 2. LILO of both circuits of Jaigarh-New Koyna 400kV quad D/C at Dhopave Table No: WR-MH-13 Uran CCPP (1040MW) 1. Upgradation of Uran-Apta 220kV 2X D/C line with ACCC TW Private Sector 620 sq mm conductors 2. Uran-Kharghar 220kV D/C line Table No: WR-MH-14 GEPL (Gupta Energy Pvt. Ltd.)TPP U- 1. GEPL – MIDC 220kV D/C line 1&2 (2x60) MW 2. LILO of one circuits of Bhadrawati – Parli 400kV line at GEPL (Private Sector) TPS with 1x80MVAR reactor Table No: WR-MH-15 NPCIL Jaitapur (3480MW) Jaitapur - Kolhapur 765 kV D/C line. (connectivity) (Central Sector) Table No: WR-MH-16 Jinbhuvish Power Gen Pvt Ltd LILO of one ckt of 400kV Wardha-Parli D/C line (600 MW) (connectivity) Private Sector Table No: WR-MH-17 Hindustan Electricty Gen Company Ltd HEGCL - Pune (GIS) 400 kV D/C line (HEGCL) (connectivity) (1137 MW) Private Sector Table No: WR-CG-01 Sipat-I(1980MW) 1. Sipat-Seoni 765kV S/c Line-1 (Central sector) 2. Sipat-Seoni 765kV S/cLine-2 3. Seoni-Khandwa 400 kV D/C (Quad AAAC) 4. LILO of one ckt of Korba STPS-Raipur at Sipat 400 kV D/C 5. LILO of Bhilai-Satpura S/C line at Seoni 400 kV D/C 6. Nagda-Dehgam 400 kV D/C 7. LILO of both ckt of S.Sarovar-Nagda D/C at Rajgarh 400 kV 2XD/C 8. Seoni S/S 765/400 kV ( 7x500 single phase units) 9. Seoni 400/220 kV 2x315 MVA S/S 10. Rajgarh 400/220 kV 2x315 MVA S/S Table No: WR-CG-02 Dedicated Transmission System for Generaion projects in Raigarh complex near Kotra [RKM Powergen Ltd, SKS Ispat & Power Ltd, DB Power Ltd, Avanta BhandarTPP, Athena Chhattisgarh Power Ltd. (2x600MW)] RKM Powergen Ltd (Uchpanda TPP) RKM Powergen – Raigarh Pooling Station(near Kotra) 400kV (4x360MW) D/c(Quad)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 937 SKS Ispat & Power Ltd (4x300MW) SKS Ispat - Raigarh Pooling Station (near Kotra) 400kV (Darrampura TPP) D/c(Quad) DB Power Ltd(2x600 MW) DB Power – Raigarh Pooling Station (near Kotra) 400kV D/c (Quad) Avantha Bhandar (Korba West) TPP Korba West – Raigarh Pooling Station (near Kotra) 400kV D/c line (2x600MW) Athena Chhattisgarh Power Ltd. Athena Chhattisgarh – Raigarh Pooling Station(near Kotra) 400kV (2x600MW) (Private Sector) D/c(Quad) Cosmos Sponge & Power Ltd. (CSPL) CSPL TPS - Raigarh Pooling Station (Near Kotra) 400kV D/c (350 MW) along with 1x80MVAR bus reactor (connectivity) Visa Steel Ltd. (450 MW) Visa Steel TPS - Raigarh Pooling Station (near Kotra) 400kV D/c along with 1x80MVAR bus reactor (connectivity) Table No: WR-CG-03 Dedicated Transmission System for GMR Chattishgarh Energy Pvt. Ltd(Raipur complex) (2X685MW) GMR Chattishgarh Energy Pvt. Ltd GMR Chattishgarh - Raipur Pooling station 400 kV D/C line (quad) Table No: WR-CG-04 Dedicated Transmission System for Generaion projects in Champa complex [Akaltara(KSK Mahanadi) Power Ltd (2400MW), Karnataka Power Corp Ltd.(KPCL) (1600MW), Lanco Amarkantak Power(1320MW), M B Power(Chhattisgarh)(1320 MW)] Akaltara(KSK Mahanadi) Power Ltd Wardha Power (KSK Mahanadi) – Champa Pooling Station (4x600MW) 400kV 2xD/c (Quad) Karnataka Power Corp Ltd.(KPCL) KPCL – Champa Pooling Station 400 kV D/C 1600MW) Lanco Amarkantak Power (1320MW) Lanco - Champa Pooling Station 400kV D/c (Quad) (U- 3, 4) M B Power (Chattisgarh) Ltd(2x660 M B Power - Champa Pooling Station 400kV D/c (Quad) MW) (connectivity) Table No: WR-CG-05 Dedicated Transmission System for Aryan Coal Beneficiaries Ltd., Dheeru Powergen and PTC India ,Spectrum Power, Maruti Clean Coal & Power Ltd. at WR Pooling Point (Bilaspur) Aryan Coal Benefications Pvt. Ltd. 1. Aryan Coal – WR Pooling Point (Bilaspur) 400kV D/C (1200MW) Dheeru Powergen and PTC 1. Dheeru Powergen-WR Pooling Station(Bilaspur) 400kV India(450+600MW) D/C(high capacity) (Private Sector) 2. Two nos of 400kV bays at WR Pooling Station(Bilaspur) Spectrum Power (100MW) (Private 1. Interconnecton of Spectrum Generation with Aryan Coal Sector) Benefications Pvt. Ltd. Maruti Clean Coal & Power Ltd. 1. Maruti Clean Coal – WR Pooling Point (Bilaspur) 400kV D/C (300MW) (Private Sector) Table No: WR-CG-06 Dedicated Transmission System for Jindal Power, TRN Energy Ltd (600MW), Sarda Energy & minerals(SEML) (350 MW), Jayaswal New Urja Ltd (JNUL) (600MW) Raigarh Ph-III(4x600MW) Jindal Power – Raigarh Pooling Station (near Tamnar) 400kV (Jindal Power Ltd) 2xD/c (Quad) TRN Energy (2x300 MW) TRN Energy– Raigarh Pooling Station (near Tamnar) 400kV 2xD/c (Quad) Sarda Energy & minerals(SEML) Sarda Energy– Raigarh Pooling Station (near Tamnar) 400kV D/c (350 MW) line Jayaswal New Urja Ltd(JNUL) JNUL– Raigarh Pooling Station (near Tamnar) 400kV D/c line (600MW) Table No: WR-CG-07 Dedicated Transmission System for Balco Ltd (600MW),Vandana Vidhyut Ltd. (540 MW) Balco Ltd (2x300MW) (Private Sector) Balco – Dharamjaygarh Pooling Station 400kV D/c (Triple) Vandana Vidyut Ltd. (4x135MW) Vandana Vidyut – Dharamjaygarh Pooling Station 400 kV D/C (Private Sector) line Table No: WR-CG-08 Combined ATS for Generation Projects 1. Raigarh Pooling Station (near Kotra) - Raipur Pooling station located in Raigarh Complex near 765 kV D/C line.938 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Kotra, Raigarh complex near Tamnar, 2. Raigarh Pooling Station (near Kotra) - Raigarh (existing) 400 Champa complex and Raipur complex kV D/C (to be kept open at a later date). of Chhattisgarh-Part-A 3. Raipur Pooling Station – Raipur (existing) 400 kV D/C line (to be kept open at a later date). 4. Establishment of 765/400kV 4x1500MVA Raigarh Pooling Station (near Kotra). 5. Establishment of 765/400kV 1x1500MVA Raipur Pooling Station Table No: WR-CG-09 Combined ATS for Generation Projects 1. Champa Pooling station- Raipur Pooling station 765 kV D/C located in Raigarh Complex near line. Kotra, Raigarh complex near Tamnar, 2. Raigarh Pooling station (near Kotra) - Raigarh Pooling station Champa complex and Raipur complex (near Tamnar) 765 kV D/C line. of Chhattisgarh-Part-B 3. Champa Pooling Station – Dharamjaygarh/Korba 765kV S/c line. 4. Raigarh Pooling Station (near Kotra) – Champa Pooling Station 765kV S/c line. 5. Establishment of 765/400kV 6x1500MVA Champa Pooling Station 6. Establishment of 765/400kV 3x1500MVA Raigarh Pooling Station(near Tamnar) Table No: WR-CG-10 Combined ATS for Generation Projects Raipur Pooling Station – Wardha 765kV D/c line located in Raigarh Complex near Kotra, Raigarh complex near Tamnar, Champa complex and Raipur complex of Chhattisgarh-Part-C Table No: WR-CG-11 Combined ATS for Generation Projects 1. Wardha – Aurangabad (PG) 765kV D/c line. located in Raigarh Complex near 2. Aurangabad(PG) – Boisar / Kharghar 400kV D/c (Quad) line. Kotra, Raigarh complex near Tamnar, 3. Augmentation of transformation capacity by 400/220kV, Champa complex and Raipur complex 1x500 MVA transformer at Boisar of Chhattisgarh-Part-D 4. Establishment of 765/400kV 2x1500MVA Aurangabad (PG) S/s Table No: WR-CG-12 Combined ATS for Generation Projects 1. Aurangabad (PG) – Padghe(PG) 765kV D/c line located in Raigarh Complex near 2. Padghe (PG) – Padghe(MSETCL) 400kV D/c (Quad) line. Kotra, Raigarh complex near Tamnar, 3. Vadodara – Asoj 400kV D/c(Quad) line. Champa complex and Raipur complex of Chhattisgarh-Part-E 4. Establishment of 765/400kV, 2x1500MVA Padghe(PG) S/s [GIS Substation] Table No: WR-CG-13 Combined ATS for Generation Projects Raipur Pooling Station – Wardha 765kV 2nd D/c line located in Raigarh Complex near Kotra, Raigarh complex near Tamnar, Champa complex and Raipur complex of Chhattisgarh-Part-F Table No: WR-CG-14 Combined ATS for Generation Projects Wardha – Aurangabad (PG) 765kV 2nd D/c line located in Raigarh Complex near Kotra, Raigarh complex near Tamnar, Champa complex and Raipur complex of Chhattisgarh-Part-G Table No: WR-CG-15 Combined ATS for Generation Projects 1. A ±600kV, 4000MW HVDC bipole between Raigarh Pooling located in Raigarh Complex near Station(near Kotra) and Dhule(PG) along with metallic return Kotra, Raigarh complex near Tamnar, 2. Dhule(PG) – Dhule(IPTC)* 400kV 2xD/c high capacity Champa complex and Raipur complex conductor. of Chhattisgarh-Part-H 3. Dhule(PG) – Nasik 400kV D/c(Quad)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 939 4. Dhule(PG) – Malegaon 400kV D/c(Quad) 5. Establishment of 4000MW ±600kV HVDC bipole terminal each at Raigarh Pooling station(near Kotra) and Dhule(PG) along with 400kV AC Station 6. Installation of 400/220kV, 2x315MVA transformer at Dhule(PG) Table No: WR-CG-16 Combined ATS for Generation Projects 1. A ±800kV, 6000 MW HVDC bipole between Champa Pooling located in Raigarh Complex near Station (WR) – near Kurushetra (NR) in Haryana with Kotra, Raigarh complex near Tamnar, metallic return (initially to be operated at 3000 MW). Champa complex and Raipur complex 2. Establishment of 3000 MW, ±800 kV HVDC bipole terminal of Chhattisgarh-Part-I each at Champa pooling station and near Kurushetra in Haryana with provision to upgrade the terminals to 6000 MW. 3. Kurukshetra(NR) - Jallandhar 400kV D/c(Quad) line ( one ckt. via 400/220kV Nakodar S/s). 4. LILO of Abdullapur – Sonepat 400kV D/c(triple) at Kurukshetra 5. Establishment of 400/220kV, 2x500 MVA S/s at Kurukshetra 6. Establishment of 400/132kV, 2x200 MVA S/s at Champa Pooling Point Table No: WR-CG-17 System Strengthening in WR for 1. Indore - Vadodara 765kV S/c Generation Projects in MP and 2. Vadodara – Pirana 400kV D/c(Quad) Chhattisgarh (being pooled at Bilaspur 3. Establishment of 765/400kV 2x1500MVA Vadodara Pooling Station) substation Table No: WR-CG-18 System Strengthening in WR for 1. Jabalpur – Bhopal -Indore 765kV D/c (quad bersimis) Generation Projects in Western Region 2. Aurangabad – Dhule- Vadodara 765kV D/c (quad bersimis) 3. Bhopal (PG) –Bhopal (MPTCL) 400kV D/C quad line 4. Dhule (PG) – Dhule (MSETCL) 400kV D/C quad line Table No: WR-CG-19 Swastik TPP U-1(25 MW) LILO of Korba – Mopaka 132KV line at Swastik TPP (Private Sector) Table No: WR-CG-20 Ratija TPP ( 50 MW) Ratija – Kasaipalli 132KV D/C line (Private Sector) Table No: WR-CG-21 MARWA CSEB ( 2x500 MW) 1. Marwa-Raipur(Raita) 400 kV D/c line State Sector 2. LILO of One ckt of Korba(W) – Khedamara 400 kV D/c line at Marwa 3. Marwa- Banari 220kV DCDS Table No: WR-CG-22 Korba(W)St-III , U-5(500MW) 1. LILO of 400 kV Korba(West)- Khederma(Bhilai)_ at Raipur (State Sector) DCDS (Raita) 2. Korba (West) - Khedamara DCDS 400 kV DCDS (Raita) line 3. Raipur (Raita) 400/220kV S/S (2x315 MVA) Table No: WR-CG-23 System Strengthening in WR common 1. Jabalpur -Bina 765kV S/c line for Western Region and Northern 2. Jabalpur – Dharamjaygah 765kV D/c Region ********940 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ANNEX – 7.3 SOUTHERN REGION –TRANSMISSION SCHEME DETAILS Southern Region – System Strengthening Schemes: Table No : SR-IS-01 System 1. Establishment of new 400/220 kV substation at Yelahanka with 2x500 MVA Strengthening in transformers and 1x63 MVAR bus reactor SR-XII 2. LILO of Nelamangla-Hoody 400kV S/c line at Yelahanka 400kV S/S 3. LILO of Somanahalli -Hoody 400kV S/c line at Yelahanka 400kV S/S Table No : SR-IS-02 System 1. 400/220kV substation at Madhugiri, provision of Strengthening in upgrading this S/S to 765kV level SR-XIII 2. Gooty – Madhugiri 400kV D/C line 3. Madhugiri – Yelahanka 400kV D/C Quad line Table No : SR-IS-03 System 1. Salem (New) – Somanahalli 400kV Quad D/C line. Strengthening in 2. 1x315 MVA 400/220kV Transformer Augmentation at Hosur 400/230 kV S/S SR-XIV Table No : SR-IS-04 System 1. North Trissur – Kozhikode 400kV Quad D/C line Strengthening in SR-XV Table No : SR-IS-05 System 1. Hosur –Electronic City 400kV D/C line Strengthening in (This line could be built using Right of Way of the existing Peenya –Singarapet SR-XVI 220kV line(presently Yerandahally –Hosur line).This right of way could be used by building multi-circuit towers and/or dismantling part of the line depending upon practicability after discussion with beneficiaries) 2. Bay extension at 400/220kV Hosur(PG) and Electronic City(KPTCL)substations. Table No : SR-IS-06 System 1. New 400kV substation each at Narendra (GIS) and Kolhapur (GIS)(which shall be Strengthening in later upgraded to 765kV ): SR-XVII 2. Narendra (GIS)-Kolhapur (GIS) 765kV D/C line (initially charged at 400kV)-about 200kms; 3. LILO of both circuits of existing Kolhapur –Mapusa 400kV D/C line at Kolhapur(GIS)- about 50kms; 4. Narendra (GIS)- Narendra (existing) 400kV D/C Quad line –about 20kms. Table No : SR-IS-07 System 1. Vijayawada – Nellore (AP) 400 kV D/C line with 63 MVAR line reactors at both Strengthening in ends of each ciruit. SR-XVIII 2. Nellore - Thiruvalam 400 kV D/C Quad line with 1x50 MVAR line reactors at (Vijaywada both ends of each circuit. Nellore- 3. Thiruvalam – Melakottaiyur 400 kV D/C line Thiruvalam- 4. LILO of existing Bangalore – Salem 400 kV S/C line at Hosur Sholinganallur Corridor) Table No : SR-IS-08 System 1. Kurnool – Thiruvalam 765 kV D/c line line with 1x240 MVAR line reactors at Strengthening both ends of each circuit. in SR-XIX 2. Provision of 2x1500 MVA, 765/400kV transformers at Thiruvalam. (Kurnool- 3. LILO of Kolar – Sriperumbudur 400 kV S/c line at Thiruvalam. Thiruvalam Corridor) Table No : SR-IS-09 HVDC Bipole 1. Establishment of a New Pugalur HVDC terminal (2500 MW) S/S having Strengthening in provision of 400kV S/S and upgradable to 765kV at later date. Southern Region 2. HVDC terminal (2500 MW) at Hyderabad (PG) 3. New Pugalur – Hyderabad HVDC bipole of + 500kV, 2500 MW¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 941 4. New Pugalur – Udumalpet 400kV quad D/C line 5. New Pugalur – Pugalur 400kV quad D/C line 6. New Pugalur HVDC – Tuticorin Pooling Station 400kV Quad D/c line 7. New Hyderabad HVDC – Hyderabad (765/400kV PG S/S ) 400kV quad 2xD/C line 8. New Hyderabad HVDC – Kurnool (765/400kV PG S/S ) 400kV quad D/C line Table No : SR-IS-10 System 1. Srikakulam PP- Vemagiri –II Pooling Station 765kV D/C line Strengthening in 2. Khammam (new)- Nagarjunr Sagar 400kV D/C line SR for import of power from ER Southern Region – Evacuation Schemes: Table No : SR-AP-01 Dedicated Transmission System for Krishnapattanam LTOA Power Projects[Simhapuri(600MW), Meenakshi(1000MW), Krishnapatnam Power (Navayuga)(1320MW), Kineta Power(1980MW), Thermal Powertech(1980MW), NCC Power (1320 MW), VSF projects(350 MW)] Simhapuri(600 MW) /MeenakshiI &II(300+700 MW) Simhapuri/Meenakshi –Nellore 400 kV D/C (quad) line alongwith associated bays Thermal Powertech (Painampuram) TPP(3x660MW) Thermal Powertech generation switchyard – Nellore Pooling station 765 kV 2xS/c line alongwith associated bays Krishnapatnam Power (Navayuga) (1320 MW) Krishnapatnam Power (Navayuga)generation switchyard – Nellore Pooling station 765 kV 2xS/C line alongwith associated bays Kineta Power(1980 MW) Kineta Power generation switchyard – Nellore Pooling station 765 kV 2xS/c line alongwith associated bays NCC Power (1320 MW) NCC Generation Switchyard –Nellore Pooling Point 400 kV D/C (quad) line VSF Projects Ltd.(350 MW) Generation Switchyard –Nellore Pooling Point 400 kV D/C line Table No : SR-AP-02 Common transmission systerm for Krishnapattanam LTOA 1. Establishment of 765/400 kV Nellore Power Projects[Simhapuri(570MW), Meenakshi(900MW), Pooling Station with 2X1500MVA Krishnapatnam Power (Navayuga)(1320MW), Kineta transformer capacity Power(1980MW), Thermal Powertech(1980MW), NCC Power (1320 MW)] 2 LILO of Simhapuri-Nellore 400 kV D/C quad line at Nellore Pooling station 3. Nellore Pooling Station – Kurnool 765 kV D/c line. 4. Kurnool – Raichur 2nd 765 kV S/C line (1st line under Krishnapatnam UMPP). Table No : SR-AP-03 Transmission system associated with Part-A Krishnapatnam –Part A and Part C 1. TPCIL –Nellore Pooling Point (earlier as Krishnapattnam (Delinked with Krishnapatnam UMPP, UMPP – Nellore) 400 kVQuad D/C line being implemented as System Strengthening scheme) 2. Nellore Pooling Point –Gooty (earlier as Krishnapatnam UMPP- Gooty) 400 kV Quad D/C line with 63MVAR line reactors at each end on both circuits.942 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Part-C 1. Establishment of new 765/400 kV substation at Kurnool with 2x 1500 MVA ICTs and 1x 240 MVAR bus reactors . 2. LILO of Nagarjuna Sagar – Gooty 400 kV S/C line at Kurnool (New) substation. 3. Kurnool(new)-Kurnool (APTRANSCO) 400 KV D/C QUAD line. 4. Krishnapattnam UMPP – Kurnool (New) 400kV, Quad D/C line with 50MVAR line reactor at each end on both circuits. (DEFFERED) 5. Kurnool (New) – Raichur 765kV S/C line (DEFFERED) Table No : SR-AP-04 Transmission system associated with Part-B Krishnapatnam –Part B 1. Establishment of new 765/400 kV substation at , Raichur (Delinked with Krishnapatnam UMPP, and Sholapur with 2x 1500 MVA ICTs and 1x 240 MVAR bus being implemented as System reactors at each S/S Strengthening scheme) 2. Establishment of new 765/400 kV substation (GIS) at Pune with 2x1500 MVA transformation capacity 3. LILO of existing Raichur-Gooty 400kV Quad D/C line at Raichur(New) substations 4. Raichur – Sholapur 765 kV S/c with 240 MVAR switchable line reactors at each end 5. Sholapur – Pune 765 kV S/c with 240 MVAR switchable line reactors at each end 6. LILO of Aurangabad- Pune 400 kV D/C at Pune(GIS) with 50 MVAR line reactor at Pune (GIS) 7. LILO of Parli-Pune 400 kV D/C at Pune (GIS) with 50 MVAR line reactor at Pune (GIS). Table No : SR-AP-05 Dedicated System for East Coast Energy(1320MW) (Private Sector) East Coast Energy- Bhavanapadu TPP 1. Generation would be stepped up at 400kV. (1320 MW) 2. Bus reactor of 1x125MVAR at generation switchyard 3. East Coast Energy generation switchyard – Srikakulam Pooling Station 400kV D/C Quad line alongwith associated bays Table No : SR-AP-06 Common transmission system LTOA 1. Establishment of 765/400kV Pooling Station in Projects in Srikakulam area[East Coast Srikakulam area with 2x1500 MVA 765/400kV Energy Pvt. Ltd. project(1320 MW)] transformer capacity 2. Srikakulam Pooling station – Angul 765 kV D/C line(Initially Charged at 400kV) 3. 765/400kV 1x1500 MVA transformer at Angul 4. Angul – Jharsuguda 765 kV D/C line 5. Jharsuguda - Dharamjaigarh 765 kV D/C line 6. Associated 400 kV and 765kV bays at Srikakulam Pooling station, Angul, Jharsuguda and Dharamjaigarh 765/400kV S/Ss. Table No : SR-AP-07 Dedicated Transmission System for IPP Projects in vemagiri area[( Spectrum Power(1400 MW), Reliance(2400 MW), GVK Gautami Power Ltd (800 MW), GVK Power (Jegurupadu) Pvt Ltd (800 MW),GMR Energy), RVK energy(360 MW)] GMR Energy (768 MW) 1. Generation would be stepped up at 400kV. Bus reactor of (Private sector) 1x80 MVAR to be provided at the generation project switchyard 2. GMR Energy switchyard – Vemagiri –II Pooling Station 400 kV D/C (quad) line Spectrum Power(1400 MW) 1. 400 kV quad D/c line to Vemagiri-II pooling station (Private sector) 2. 125 MVAR Bus Reactor at generation switchyard¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 943 Reliance Infrastructure Ltd.(2400 MW) 1. 400 kV quad 2xD/c line to Vemagiri-II pooling station (Private sector) 2. 2x125 MVAR Bus Reactor at generation switchyard GVK Gautami Power Ltd (800 MW) 1. Bus extn of the existing switchyard 2. 400 kV D/c line to Vemagiri-II pooling station 3. 80 MVAR Bus Reactor at generation switchyard GVK Power (Jegurupadu) Pvt Ltd (800 1. Bus extn of the existing switchyard or LILO of one of the MW) existing 400 kV D/c line at new switchyard 2. 400 kV D/c line to Vemagiri-II pooling station 3. 80 MVAR Bus Reactor at generation switchyard RVK Energy (Rajamundry) Pvt 1. RVK Energy switchyard – Vemagiri –II Pooling Station Ltd(360MW) 400 kV D/C line Table No : SR-AP-08 Common Transmission System for IPP 1. Establishment of 765/400kV GIS Pooling station at Projects in vemagiri area[( Spectrum Vemagiri with 4x1500 MVA transformer with Power(1400 MW), Reliance(2400 MW), sectionalisation arrangement to control short circuit MVA GVK Gautami Power Ltd (800 MW), GVK 2. LILO of Gazuwaka – Vijayawada 400kV S/c line at Power (Jegurupadu) Pvt Ltd (800 Vemagiri Pooling Station for initial integration with SR MW),GMR Energy)] grid and which later shall be bypassed 3. Establishment of 765/400kV GIS Pooling station at Khammam with 2x1500MVA transformers each and 400kV operation of Khammam S/s 4. Hyderabad 765/400 kV S/s – Hyderabad (existing) 400 kV D/c (quad) line 5. Khammam 765/400 kV S/s – Khammam (existing) 400 kV D/c (quad) line 6. Vemagiri Pooling Station – Khammam 765kV 2xD/c line(initally charged at 400kV) 7. Khammam – Hyderabad 765 kV 2xD/c line(initally charged at 400kV) 8. Hyderabad – Wardha 765 kV D/c line 9. Wardha – Jabalpur Pooling station 765 kV D/c 10 Establishment of 765/400kV GIS Pooling station at Hyderabad with 2x1500MVA transformers each Table No : SR-AP-09 Hinduja Vizag(1040 MW) (Private Sector) Generation switchyard- Vemagiri-II PP 400kV D/C Quad line Table No : SR-AP-10 Lanco Kondapally St-III (Private Sector) Lanco – Vijaywada 400kV D/C line (existing) Table No : SR-AP-11 Rayalseema St -III (U-6) (State Sector) RSTPP Generation Switchyard- Chittoor 400 kV D/C line Table No : SR-AP-12 Pulichintala(2x30MW)(State Sector) 1. 132Kv Pulichintala HEP-Chillakallu DC line 2. 132Kv bay extensions at Chillakallu Table No : SR-AP-13 Lower Jurala U1-6(6X40MW)(State Sector) 1. 220Kv Lower Jurala HEP switchyard-220/132Kv Jurala S/S D/C line 2. 400Kv Veltoor -220Kv Jurala S/S ,220Kv D/C line Table No : SR-AP-14 Sri Damodaram Sanjeevaiah TPP 1. Krishnapattnam - Nellore 400kV Quad D/C line (Krishnapatnam TPP) (2X800MW)(State 2. Krishnapattnam - Chittoor 400kV Quad D/C line Sector) Table No : SR-KA-01 Torangallu Jindal U3(300MW) 1. Torangallu JSW -Gooty 400kV D/C line (Private Sector) 2. LILO of RTPS- Guttur at Thorangallu JSW S/S Table No : SR-KA-02944 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Gundia HEP(2X200MW)(State 1. LILO of one of D/C line b/w Nandikur(Nagarjuna TPP) near Udupi and Hasan to Sector) evacuate power of Gundia Power house 2. Step up voltage for Gundia HEP as 400kV Table No : SR-KA-03 Yeramarus (1600 MW) 1. Edlapur TPS - Yermarus TPS S/S 400 kV DC Twin moose line (State Sector) Edlapur(800MW) 2. The existing Raichur TPS – Davangere 400kV SC line to be converted to (State Sector) 400kV DC line with QUAD conductors along with shifting of Raichur termination point to Yeramaras TPS switchyard. 3. BTPS – Hiriyur (under construction) 400 kV DC twin line 4. BTPS – Madhugiri(Tumkur) – 400 kV Quad DC line System for additional inter- 1. Yeramarus TPS – Raichur (New) 400kV Quad DC line connection with ISTS and increased reliability: Table No : SR-KA-04 Kudgi Phase-I 1. Kudgi TPS – Narendra (New) 400 kV 2xD/C quad lines (Central Sector) 2. Narendra (New) – Madhugiri 765 kV D/c line (3x800 MW) 3. Madhugiri – Bidadi 400 kV D/c (quad) line. Table No : SR-KA-05 Surena Power Ltd. (420 Surena Generation Switchyard – Raichur 400kV D/c line MW) Table No : SR-KE-01 Thottiar HEP(2X80MW) (State Sector) 1. Generation to be stepped up to 220kV for evacuation 2. Upgrading the existing 110kV Kodakara S/S to 220kV 3. 220kV D/C line from switchyard to Kodakara S/S 4. LILO of Idukki-Kozikode 220kVS/C line Kodakara Table No : SR-KE-02 Pallivasal HEP (60 MW) (State Sector) 1. Evacuation at lower level (existing) Table No : SR-TN-01 Tuticorin JV(500 MW) (Central Sector) Tuticorin – Madurai 400kV D/c line (Quad conductor) Table No : SR-TN-02 Dedicated Transmission System for Tuticorin LTOA Power Projects[(Coastal Energen Pvt. Ltd. Project(1200MW), Ind- Barath Power (Madras) Ltd. Project(1320MW)] Coastal Energen Pvt. Ltd. Project(Melamuruthur 1. Generation would be stepped up at 400kV TPP) (2x600MW) 2. Coastal Energen generation switchyard –Tuticorin Pooling Station 400kV D/C Quad line alongwith associated bays Ind-Barath Power (Madras) Ltd. Project(1320MW) 1. Generation would be stepped up at 400kV 2. Ind-Barath Power generation switchyard –Tuticorin Pooling Station 400kV D/C Quad line alongwith associated bays Table No : SR-TN-03 Common Transmission System for Tuticorin LTOA 1. Establishment of 765 kV Pooling station in Tuticorin (initially Power Projects[(Coastal Energen Pvt. Ltd. charged at 400 kV) Project(1200MW), Ind-Barath Power (Madras) Ltd. 2. LILO of both circuits of Tuticorin JV – Madurai 400 kV D/C Project(1320MW)] Quad line at Tuticorin Pooling Station 3 Salem Pooling Station – Salem 400 kV D/C (quad) line. 4. Tuticorin Pooling station – Salem Pooling station 765 kV D/C line (initially charged at 400 kV) 5. Salem Pooling Station – Madhugiri Pooling Station 765 kV S/C line (initially charged at 400 kV) 6. Associated 400 kV bays at Tuticorin Pooling station, Salem Pooling Station, Salem and Madhugiri. 7 Establishment of 765 kV Pooling station in Salem (initially charged at 400 kV)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 945 Table No : SR-TN-04 Immediate Evacuation for ISGS Projects in Nagapattinam and Cuddalore Area of tamilnadu [ (NSL Nagaattinam(1320 MW), PPN Power Generating Company (1080 MW) , IL & FS(1200 MW), PEL Power (1050 MW), Chettinad powert(1320)](Private Sector) NSL Nagaattinam(1320 MW) 1. Generation-Switchyard-Nagapattinam Pooling station 400kV D/c quad or HTLS line 2. 125 MVAR bus reactor at generation switchyard. PPN Power Generating Company (1080 MW) 1. Generation-Switchyard-Nagapattinam Pooling station 400kV D/c line 2. 80 MVAR bus reactor at generation switchyard. PEL Power Ltd(1050 MW) 1. Generation-Switchyard-Nagapattinam Pooling station 400kV D/c quad line 2. 125 MVAR bus reactor at generation switchyard. IL&FS Tamil Nadu power company Ltd(1200 1. Generation-Switchyard-Nagapattinam Pooling MW) station 400kV D/c quad line 2. 125 MVAR bus reactor at generation switchyard. Chettinad power Corporation Ltd. (1320 MW) 1. Generation-Switchyard-Nagapattinam Pooling station 400kV D/c quad line 2. 125 MVAR bus reactor at generation switchyard. Table No : SR-TN-05 Common Transmission system for ISGS 1. New 765/400kV Pooling Station at Nagapattinam Projects in Nagapattinam and Cuddalore (GIS)with sectionalisation arrangement to control short Area of Tamilnadu circuit MVA (initially charged at 400kV) 2. LILO of Neyveli – Trichy 400kV S/c line at Nagapattinam Pooling Station for initial arrangement which later shall be bypassed –about 20kms 3. 2 nos. 400kV bays each at Nagapattinam Pooling Station and Salem for terminating Nagapattinam Pooling Station – Salem 765kV D/C line (initially charged at 400kV)being implemented under Tariff based bidding 4. 1 no. 400kV bay each at Salem and Madhugiri for terminating Salem- Madhugiri 765 kV S/C line -2(initially charged at 400kV) being implemented under Tariff based bidding 5. 2 nos. 400kV bays each at Madhugiri and Narendra for terminating Madhugiri – Narendra 765kV D/C line (initially charged at 400kV) being implemented under Tariff based bidding 6. 2 nos. 400kV bays each at Kohlapur ,Padghe & Pune for terminating Kohlapur- Padghe 765kV D/C line (one circuit via Pune) (initially charged at 400kV) being implemented 7. Nagapattanam Pooling Station- Salem 765kV D/c line 8. Salem – Madhugiri 765kV S/c line 9. Madhugiri-Bangalore 400kV D/c quad line Table No : SR-TN-06 RegenPowertech Pvt ltd. (600 MW) Regen Pooling Station Pugalur 230kV D/C (twin Moose) line (connectivity) Table No : SR-TN-07 Udangudi(1600MW)(State Sector) 1. Udangudi TPS - Karaikudi 400 kV D/C Quad line 2. Udangudi TPS - Kayathar 400 kV D/C Quad line Table No : SR-TN-08 Kalapakkam PFBR (500MW) 1. Kakapakkam – Arni 230 kV D/C line (Central Sector) 2. Kakapakkam PFBR– Kanchepuram 230 kV D/C line 3. Kakapakkam PFBR –Siruchri 230 kV D/C line 4. Kakapakkam – MAPS 230 kV S/C cable ********946 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ANNEX – 7.4 EASTERN REGION –TRANSMISSION SCHEME DETAILS Eastern Region – System Strengthening Schemes: Table No: ER-IS-01 Eastern Region Strengthening 1. Sasaram-Daltonganj 400kV D/C line Scheme-III 2. Mendhasal-Pattanaiakya 400kV D/C line 3. LILO of Kahalgaon-Biharsharif 400kV D/C line (1st line) at Lakhisarai 4. LILO of Kahalgaon-Biharsharif 400kV D/C line (2st line) at Banka 5. LILO of Meramundali-Jeypore 400kV S/C line at Bolangir 6. LILO of Rangali-Baripada 400kV S/C line at Keonjhar 7. LILO of one Ckt. of Baripada-Mendhasal 400kV D/C line at Dubri(OPTCL) 8. LILO of Jamshedpur-Rourkela 400kV D/C line at Chaibasa 9. Daltonganj(New)) 2x315 MVA, 400/220 kV sub-station. 10. Lakhisarai(New) 2x200 MVA, 400/132 kV sub-station. 11. Banka(New) 2x200 MVA, 400/132 kV sub-station. 12. Bolangir(New) 2x315 MVA, 400/220 kV sub-station. 13. Keonjhar(New) 2x315 MVA, 400/220 kV sub-station. 14. Chaibasa(New) 2x315 MVA, 400/220 kV sub-station. 15. Pattanaiakya(New) 2x315 MVA, 400/220 kV sub-station. Table No: ER-IS-02 Eastern Region Strengthening 1. Additional 1X160MVA, 220/132kV Transformer with associated Scheme-IV bays at 220/132kV Siliguri Substation 2. Replacement of 1X50MVA, 220/132kV Transformer by 1X160MVA, 220/132kV Transformer with associated bays at 220/132kV Birpara Substation 3. Installation of additional Bay/Breaker against 400kV Malda- Farakka-I feeder at Malda Substation 4. Replacement of 2X50MVA, 220/132kV Transformers by 2X160MVA, 220/132kV Transformers with associated bays at 400/220/132kV Malda Substation Table No: ER-IS-03 Eastern Region Strengthening 1. Establishment of 400/220 kV, 2X500 MVA Rajarhat substation Scheme-V 2. LILO of Subhashgram- Jeerat 400kV S/C line at Rajarhat 3. Rajarhat-Purnea 400 kV D/c line (triple snowbird), with LILO of one circuit at Gokarna and other circuit at Farakka Table No: ER-IS-04 Eastern Region System 1. Kharagpur-Chaibasa 400kV D/C line Strengthening Scheme -VII 2. Purulia PSS- Ranchi 400kV D/C line Table No: ER-IS-05 Eastern Region System 1. LILO of Barh – Gorakhpur 400kV D/C line at Motihari (2xD/C quad) Strengthening Scheme - VI 2. Mujaffarpur – Darbhanga 400kV D/C line with triple smowbird conductor 3. 2x500 MVA 400/220kV S/s at Darbhanga (GIS) with space for future extension 4. 2x200 MVA 400/132kV S/s at Motihari (GIS) ) with space for future extension 5. 2x80 MVAR Line reactors (Switchable) at Mothihari end (with 600 ohm NGR) for Barh-Mothihari section 6. 2x50 MVAR Line reactors (fixed) at Mothihari end (with 400 ohm NGR) for Mothihari-Gorakhpur section Eastern Region – Evacuation Schemes: Table No: ER-BR-01 Barh-II U1,2 (1320 MW) (Central Sector) Barh-II - Gorakhpur 400kV D/c line (quad)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 947 Table No: ER-BR-02 Nabi Nagar JV (Rly+NTPC) Nabinagar-Sasaram 400kV D/C line with twin lapwing (1000MW) (Central Sector) conductor Table No: ER-BR-03 New Nabi Nagar JV (Bihar+NTPC) 1. Nabinagar-Gaya 400kV D/C (Quad) line (1980MW) 2. Nabinagar-Patna 400kV D/C (Quad) line (Central Sector) 3. Augumentation of Gaya 765/400kV 1x1500 MVA Transformer. Table No: ER-BR-04 Muzzafarpur ext JV (390 MW) (Central Sector) Existing System will be adequate Table No: ER-JH-01 Bokaro Expansion(500 MW) (Central Sector) 1. Bokaro Extn. - Kodarma 400kV D/C line Table No: ER-JH-02 Dedicated System Adhunik Power, Corporate Power (Phase-I & Phase-II), Essar Power Adhunik Power .(540 MW) 1. Adhunik TPS- Jamshedpur 400kV D/C line (Private Sector) Corporate Phase-I (Mata Shri Usha TPP)(540MW) 2. Corporate phase-I TPS-Ranchi 400kV D/C line (Private Sector) Corporate Phase-II (540MW) 3. Corporate phase-II TPS-Jharkhand Pooling (Private Sector) station 400kV D/C line Electrosteel TPS (Essar Power) (1200 MW) 4. Electrosteel TPS-Jharkhand Pooling station (Private Sector) 400kV quad D/C line Table No: ER-JH-03 Common system strengthening for Phase-I 1. Ranchi – Gaya 400 kV (Quad) line via pooling Generation Projects in Jharkhand [(Adhunik station proposed near Essar / Corporate Power(540 MW), Corporate (540+540 MW), Essar generation project Power(1200 MW)]-Part-A 2. Ranchi New (765/400kV S/s) - Dharamjaygarh / near Korba 765kV S/c 3. Establishment of 400kV Pooling Station (Jharkhand Pool) near Essar and Corporate generation projects. This will be a switching station without ICTs 4. New 2x1500 MVA, 765/400 kV substation at Varanasi 5. Gaya – Varanasi 765 kV S/c 6. Varanasi- Balia 765kV S/c Table No: ER-JH-04 Common system strengthening for Phase-I 1. New 2x1500 MVA, 765/400 kV substation at Generation Projects in Jharkhand [(Adhunik Kanpur Power(540 MW), Corporate (540+540 MW), Essar 2. Varanasi – Kanpur 765 kV D/c Power(1200 MW)]-Part-B 3. Kanpur – Jhatikra 765 kV S/c 4. Kanpur (765/400kV) - Kanpur (Existing) 400kV D/C (Quad) 5. Varanasi - Sarnath (UPPCL) 400kV D/c (quad) 6. LILO of Sasaram - Allahabad 400kV line at Varanasi 7. Private Sector line: Dharamjaygarh – Jabalpur 765kV D/C line (2nd line) would be under the scope of private sector. Table No: ER-JH-05 Tilaiya UMPP (4000MW) 1. Tilaiyya UMPP - Balia 765 kV D/C line (Private Sector) 2. Tilaiyya UMPP - Gaya 765 kV S/C line 3. LILO of one Ckt.of Tilaiyya UMPP - Balia 765 kV D/C line at Gaya Table No: ER-JH-06 Common System for Tilaiya, Barh-II and 1. Balia-Lucknow 765kV S/C(2nd) Nabinagar JV (Rly+NTPC) 2. Lucknow -Bareilly 765kV S/C(2nd)948 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 3. Bareilly -Meerut 765kV S/C(2nd) 4. Meerut -Moga 765kV S/C 5. Ranchi-WR Pooling 765kV S/C(2nd) Table No: ER-OR-01 Dedicated Transmission System for Phase-I Generation Projects in Orissa[Sterlite TPP U 1&2, 3&4 (2400 MW), Monet Power (1050 MW), GMR(1050 MW), Nav Bharat (1050 MW), Ind Barat(700 MW), Jindal (1200MW), Lanco Baabandh (2640 MW),Lanco(2640MW),Derang(1200 MW)] Sterlite TPP U 1&2, 3&4 (2400 MW) (Private Sterlite TPP – Jhasuguda 765/400kV Pooling station Sector) 2X400kV D/c line Monet Power (1050 MW) (Private Sector) Monnet- Angul Pooling point 400kV D/c line GMR(1050 MW) (Private Sector) GMR-Angul Pooling point 400kV D/c line Nav Bharat (1050 MW) (Private Sector) Navbharat TPP – Angul Pooling point 400kV D/C (Quad) line Ind Barat(700 MW) (Private Sector) Ind-Barath TPS-Jharsuguda 400 kV D/C line Jindal (1200MW) (Private Sector) Jindal TPP – Angul Pooling point 400kV D/C line Lanco Babandh(4x660MW) (Private Sector) Lanco-Angul Pooling Point 400kV 2X D/c line Derang TPP(2x600 MW) (Private Sector) Derang –Angul Pooling Point 400kV D/C line Table No: ER-OR-02 Common Transmission System Phase-I Generation 1. Angul Pooling Station – Jharsuguda Pooling Projects in Orissa[Sterlite TPP U 1&2, 3&4 (2400 Station 765kV 2xS/c MW), Monet Power (1050 MW), GMR(1050 MW), 2. LILO of Rourkela – Raigarh 400kV D/c at Nav Bharat (1050 MW), Ind Barat(700 MW), Jindal Jharsuguda Pooling station (1200MW), Lanco(2640MW)] Part-A 3. **LILO of Meramundali – Jeypore 400kV S/c line at Angul pooling station 4. **LILO of one ckt of Talcher - Meramundali 400kV D/c line at Angul pooling station 5. Establishment of 2x1500 MVA, 765/400kV Pooling Station at Jharsuguda 6. Establishment of 4x1500MVA, 765/400kV Pooling Station at Angul **These LILO would be later disconnected when Angul pooling station is developed Table No: ER-OR-03 Common Transmission System Phase-I Generation 1. Establishment of 765kV switching station at Projects in Orissa[Sterlite TPP U 1&2, 3&4 (2400 Dharamjaygarh / near Korba MW), Monet Power (1050 MW), GMR(1050 MW), 2. Establishment of 765/400kV Pooling Station at Nav Bharat (1050 MW), Ind Barat(700 MW), Jindal Jabalpur (1200MW), Lanco(2640MW)] Part-B 3. Jharsuguda Pooling Station – Dharamjaygarh / near Korba (WR) 765kV D/c 4. LILO of Ranchi – WR Pooling near Sipat 765kV S/c line at Dharamjaygarh / near Korba 5. Dharamjaygarh / near Korba – Jabalpur Pooling Station 765kV D/c line 6. Jabalpur Pooling Station – Jabalpur 400 kV D/c Quad line Table No: ER-OR-04 Common Transmission System Phase-I Generation 1. Jabalpur Pooling Station – Bina 765kV D/c line Projects in Orissa[Sterlite TPP U 1-4 (2400 MW), 2. Bina – Gwalior 765kV S/c (3rd circuit) Monet Power (1050 MW), GMR(1050 MW), Nav 3. Gwalior - Jaipur 765kV S/c line (2nd circuit) Bharat (1050 MW), Ind Barat(700 MW), Jindal 4. Jaipur - Bhiwani 765kV S/c line (1200MW), Lanco(2640MW)] Part-C Table No: ER-OR-05 Common Transmission System Phase-I Generation 1. Establishment of 2x1500MVA, 765/400kV Bhopal Projects in Orissa[Sterlite TPP U 1&2, 3&4 (2400 Pooling Station MW), Monet Power (1050 MW), GMR(1050 MW), 2. Jabalpur Pool – Bhopal – Indore 765kV S/c Nav Bharat (1050 MW), Ind Barat(700 MW), Jindal 3. Bhopal New substation – Bhopal (M.P.) 400kV (1200MW), Lanco(2640MW)] Part-D D/c (high capacity)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 949 Table No: ER-SM-01 Dedicated Transmission System for Phase-I Generation Projects in Sikkim[Teesta – III HEP(1200MW), Teesta-VI(500 MW), Rangit-IV (120 MW), Chujachen (99MW), Bhasmey (51 MW), Jorethang Loop(96 MW), Rongnichu(96 MW)] Teesta – III HEP(1200MW) (Private Sector) Teesta-III – Karandighi 400kV D/c line with Quad Moose conductor Teesta-VI(500 MW) (Private Sector) Teesta-VI-Rangpo 220kV D/C(twin moose) Rangit-IV (120 MW) (Private Sector) Rangit-IV-New Melli 220kV D/Cline Bhasmey (51 MW) (Private Sector) LILO of one ckt. Chujachan-Rangpo 132kV D/c at Bhasmey Jorethang Loop(96 MW) (Private Sector) Jorrethang-New Melli 220kV D/Cline Rongnichu(96 MW) (Private Sector) Rongnichu-New Melli 220 kV D/c line Chujachen HEP (99MW) (Gati ) LILO of Melli –Gantok at Chuzachen D/C (LILO point at Namthang) Table No: ER-SM-02 Common Transmission System for Phase-I 1. Establishment of New 2x315 MVA, 400kV sub- Generation Projects in Sikkim[Teesta – III station at Karandighi HEP(1200MW), Teesta-VI(500 MW), Rangit-IV 2. LILO of Siliguri (Existing) – Purnea 400kV D/c (120 MW), Chujachen (99MW), Bhasmey (51 MW), line(quad) at new pooling station at Karandighi Jorethang Loop(96 MW), Rongnichu(96 MW)]- 3. LILO of Siliguri (Existing) – Purnea 400kV D/c line Part-A (on which re-conductoring with high capacity HTLS conductor is undertaken by PGCIL) at Karandighi with construction of LILO portion to be made by Quad moose conductor line. 4. LILO of Siliguri – Dalkhola 220kV D/c line at new pooling station at Karandighi Table No: ER-SM-03 Common Transmission System for Phase-I 1. (a). Establishment of 16x105MVA, 1 ph, Generation Projects in Sikkim[Teesta – III 400/220kV and 3x100MVA 220/132kV, Gas HEP(1200MW), Teesta-VI(500 MW), Rangit-IV Insulated Substation at Rangpo (120 MW), Chujachen (99MW), Bhasmey (51 MW), 1. (b). Establishment of 3x100MVA 220/132kV trf at Jorethang Loop(96 MW), Rongnichu(96 MW)]- Rangpo GIS Part-B 2. Establishment of 220kV Switching station at New Melli 3. LILO of Teesta III – Karandighi 400kV Quad D/c line (to be constructed through JV route) at Rangpo 4. New Melli - Rangpo 220kV D/c line (with twin Moose conductor) 5. LILO of Gangtok-Rangit 132kV S/c line at Rangpo and termination of Gangtok- Rangpo/Chujachen and Melli–Rangpo/Chujachen 132kV lines (constructed under part-A through LILO of Gangtok-Melli 132kV S/c line upto Rangpo) at Rangpo sub-station 6. LILO of Existing Teesta V – Siliguri 400kV D/c line at Rangpo 7. Karandighi – Patna (PG) 400kV D/c (quad) line Table No: ER-SM-04 Dedicated Transmission System for Phase-II Generation Projects in Sikkim[Dikchu(96 MW), Panan(300 MW), Ting Ting(99 MW), Tashiding(97 MW)] Dikchu(96 MW) 1. Dikchu HEP- Gangtok 132kV D/c with Zebra (State Sector) conductor. 2. Dikchu HEP- Mangan (PG) 132kV D/c line with Zebra conductor. Panan(300 MW) (Private Sector) 1. Panan-Mangan 400kV D/C line Ting Ting(99 MW) (Private Sector) 1. Tingting- Tashiding PS 220kV D/C line Tashiding(97 MW) 1. Tashiding- Tashiding PS 220kV D/C line950 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] (Private Sector) Table No: ER-SM-05 Common Transmission System for Phase-II 1. Establishment of 4x105MVA, Single Phase, Generation Projects in Sikkim[Dikchu(96 MW), 400/132kV pooling station at Mangan. Panan(300 MW), Ting Ting(99 MW), Tashiding(97 2. LILO of Teesta-III – Karandighi 400kV D/c line at MW)] Part-A Mangan 3. Mangan – Karandighi 400kV D/c line with quad moose conductor 4. New Melli – Rangpo 220kV D/c with twin moose conductor (2nd line) Table No: ER-SM-06 Common Transmission System for Phase-II 1. Establishment of 220kV Gas Insulated Generation Projects in Sikkim[Dikchu(96 MW), Pooling/Switching Station near Tashiding Panan(300 MW), Ting Ting(99 MW), Tashiding(97 2. Pooling station near Tashiding – New Melli 220kV MW)] Part-B D/c with twin moose conductor Table No: ER-WB-01 Raghunathpur Ph-1, U-1 & 2 (2x600MW) 1. LILO of one ckt of Maithon(PG)-Ranchi 400kV line (Central Sector) at Ragunathpur 2. Raghunathpur-Ranchi 400kV quad D/C line Table No: ER-WB-02 Common Transmission System for import of 1. Maithon – Gaya 400kV quad D/C line power from DVC by NR 2. Gaya - Sasaram 765kV S/C line 3. Gaya-Balia 765kV S/C 4. Balia-Lucknow 765kV S/C 5. LILO of both circuits of Allahabad - Mainpuri 400kV D/C line at Fatehpur 765/400kV sub-station of POWERGRID 6. Ranchi-WR Pooling 765kV S/C 7. Sasaram-Fatehpur(PG 765kV s/s) 765kV S/C line 8. Fatehpur(PG 765kV s/s) - Agra 765kV S/C line 9. Biharsharif – Sasaram(PG 765kV s/s) 400kV quad D/C line 10. 40% Series compensation of Barh-Balia 400kV quad D/C line at Balia end 11. 40% Series compensation of Biharsharif-Balia 400kV quad D/C line at Biharsharif /Balia end 12. Lucknow 765/400kV new sub-station – Lucknow 400/220kV existing sub-station 400 kV quad 2xD/c line 13. Bareilly 765/400kV new sub-station – Bareilly 400/220kV existing sub-station 400 kV quad 2xD/c line ( to match with NKSTPP System) 14. Ranchi 765/400kV new sub-station – Ranchi 400/220kV existing sub-station 400 kV quad 2xD/c 15. LILO of both circuits of Barh - Balia 400kV D/C quad line at Patna 16. Establishment of Gaya 765/400kV Substation with 3X1500 MVA transformers 17. Establishment of Sasaram 765/400kV Substation with 2X1500 MVA transformers 18. Establishment of Ranchi 765/400kV Substation with 2X1500 MVA transformers 19. Establishment of Fathepur 765/400kV Substation with 2X1500 MVA transformers 20. Establishment of Agra 765/400kV Substation with 2X1500 MVA transformers 21. Establishment of Balia 765/400kV Substation with 2X1500 MVA transformers¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 951 22 Establishment of Lucknow 765/400kV Substation with 2X1500 MVA transformers Table No: ER-WB-03 Transmission system for Pooling Station in ER 1. New 2x315MVA, 400/220kV AC Pooling Station at and transfer of power to NR/WR from projects Alipurduar in Bhutan 2. Extension of +800 kV HVDC station with 3000 MW inverter module at Agra 3. LILO of Bishwanath Chariyali – Agra HVDC line at new pooling station in Alipurduar for parallel operation of the HVDC station 4. LILO of Bongaigaon – Siliguri 400kV D/c line(quad) ( under Pvt. Sector) at new pooling station in Alipurduar 5. LILO of Tala-Siliguri 400kV D/c line at new pooling station in Alipurduar. 6. LILO of Birpara-Salakati 220kV D/c line at new pooling station in Alipurduar 7. HVDC sub-station with + 800 kV, 3000MW converter module at new pooling station at Alipurduar. Table No: ER-WB-04 CESC Haldia(600 MW) (Private Sector) CESC Haldia-Subhasgram 400 kV D/C line Table No: ER-WB-05 Durgapur DPL New(U-8) (250 MW) DPL-Bidhannagar 400kV D/C line (State Sector) Eastern Region – System Strengthening Schemes of STUs: Table No: ER-SS-WB System Strengthening Scheme in West 1. LILO of Kolaghat-Baripada 400kV S/C line at Bengal Kharagpur 2. Chanditala- Subhashgram 400kV D/C line 3. Chanditala- Kharagpur 400kV D/C line **************952 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ANNEX – 7.5 NORTH-EASTERN REGION –TRANSMISSION SCHEME DETAILS North-Eastern – System Strengthening Schemes: Table No: NER-IS-01 Strengthening of Transmission in NER 1. LILO of one ckt (2nd) of Silchar - Bongaigaon 400kV D/c at Phase-II Byrnihat 2. LILO of Balipara-Khupi 132kV S/c at Bhalukpong 3. NER PP (Biswanath Chariali) - Itanagar (Zebra conductor) 132kV D/c line 4. LILO of one ckt of Pallatana-Silchar 400kV D/c at P. K. Bari 5. Extension of Bhalukpong PG 132/33kV S/s 6. Extension of P. K. Bari 400/132kV with 4 single phase units of 50 MVA) Northern-Eastern – Evacuation Schemes: Table No: NER-ArP-01 Pare Dikrong HEP (110MW) 1. LILO of RHEP-I -Nirjouli 132kV S/c line at Dikrong HEP (Central Sector) 2. LILO of one ckt of RHEP-I -Edavger 132kV D/c line at Dikrong HEP 3. 2nd 315 MVA 400/220kV ICT at Misa Table No: NER-ArP-02 Kameng HEP (600MW) 1. Kameng-Balipara 400kV D/c line (Central Sector) 2. Balipara-Bongaigaon (Quad) 400kv D/c line with 30% FSC Table No: NER-ArP-03 Lower Subansiri (2000MW) Lower-Subansiri-Biswanath Chariyali(PP) 400kV 2XD/C (Central Sector) (Twin Lapwing) Table No: NER-ArP-04 Combined Transmission system for 1. Biswanath Chariyali – Agra +800 kV, 6000 MW HVDC bi- Transfer of Power from NER to NR/WR pole line 2. LILO of Ranganadi – Balipara 400kV D/C line at Biswanath Chariyali (Pooling Point) 3. Biswanath Chariyali – Biswanath Chariyali (AEGCL) 132 kV D/c line 4. Establishment of 400/132 kV Pooling Station at Biswanath Chariyali (2x200MVA) 5. HVDC rectifier module of 3,000 MW at Biswanath Chariyali and inverter module of 3,000 MW capacity at Agra. 6. Balipara-Biswanath Chariyali(PP) 400kV D/c line 7. 1x315 MVA 400/220kV S/s at Agra Table No: NER-ArP-05 Khuitam(33 MW) (Private Sector) Khuitam - Dinchang 220 kV D/c line Table No: NER-ArP-06 Demwe Lower (341 MW) 1. Demwe Lower - Kathalguri 400 kV D/c line via Namsai PP (Private Sector) 2. 400 kV operation of Kathalguri - Misa D/c line 3. Establishment of 400/220 kV, 630 MVA Mariani S/s T able No: NER-ArP-07 Dedicated sysyem for KSK Dibbin, Patel Hydro, Nafra KSK Dibbin Hydro Power Ltd(2x60 MW) KSK Dibbin - Dinchang PP 220kV D/C line Patel Hydro pvt Ltd (Ghongri and Saskngrong - Goongri 132kV D/c lline Saskngrong)(3x48+ 2x22.5 MW) Goongri - Dinchang PP 220kV D/C line SEW Nafra power Corporation Ltd(2x60 Nafra - Dinchang PP 220kV D/C line MW) Adishankar Khitam power ltd(3x22 MW) Kuitam - Dinchang PP 220kV D/C line Table No: NER-ArP-08 Common Transmisin Sytem for KSK Dibbin Hydro Power Ltd, 1. 440/220kV ,2x315 MVA Pooling Ghongri and Saskngrong, Nafra power and Adishankar Khitam station at Rangia/ Rowta power 2. 440/220kV ,2x315 MVA Pooling¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 953 station at Dinchang 3. LILO of Bongaigaon – Balipara 400kV D/C line at rangia/Rowta 4. Dinchang PP –Rangia/ Rowta 400kV D/C (quad) line 5. Silchar – Misa 400kV (quad) D/C line Table No: NER-AS-01 Dedicated sysyem for Bongaigaon TPP Bongaigaon TPP(3x250 MW) (Central Sector) Bongaigaon – Bongaigaon (PG) 400kV D/c line Table No: NER-AS-02 Combined System for Bongaigaon TPP 1. Silchar-Badarpur (PG) Switching Satation 132kV D/c (750MW) & Palatana (726 MW) (Central line Sector) 2. Silchar-P. K. Bari (TSECL) 400kV D/c line (charged at 132 kV) 3. Silchar - Melriat New PG 400kV D/c line (charged at 132kV) 4. Silchar - Imphal 400kV D/c line (charged at 132kV) 5. Melriat (New)-Melriat (Mizoram) 132kV D/c line 6. Silchar-Srikona (AEGCL) 132kV D/c line 7. Silchar-Hailakandi (AEGCL) 132kV D/c line 8. LILO of Loktak-Imphal (PG) 132kV D/c line at Imphal (New) 9. LILO of one ckt of Kathalguri-Misa 400 kV D/C at Mariani (New) (charged at 220 kV) 10. Mariani (New)-Mokokchung (PG) 220kV D/c line 11. Mokokchung (PG)-Mokokchung (Nagaland) 132kV D/c line with Zebra conductor 12. Passighat-Roing 132kV S/c on D/c line 13. Roing-Tezu 132kV S/c on D/c line 14. Tezu-Namsai 132 kV S/c on D/c line 15. Establishment of 400/132kV Silchar S/S (2x200 MVA) 16. Establishment of Melriat 132/33kV S/S (upgradable to 400 kV) (2x50 MVA) 17. Establishment of 132/33kV Imphal (New) S/S (upgradable to 400 kV) (2x50 MVA) 18. Establishment of Mariani 220kV Switching Station (upgradable to 400 kV) 19. Establishment of Mokokchung 220/132kV S/S (7x10 MVA one spare) 20. Establishment of Roing 132/33kV S/S (single phase 7x5 MVA one spare) 21. Establishment of Tezu 132/33 S/S (single phase 7x5 MVA one spare) 22. Establishment of Namsai 132kV S/S (2x15 MVA) 23. Bus Reactor at Silchar (2x63 MVAR) 24. Bus Reactor at Bongaigaon (1x80 MVAR) 25. 50 MVAR line reactors in each ckt of Pallatana- Silchar 400 kV D/C line at Silchar end 26. 63 MVAR line reactors in each ckt of Silchar- Bongaigaon 400 kV D/C line at Silchar and Bongaigaon ends 27. 400/ 220kV (2x315 MVA transformers) at BTPS (NTPC) 28. 400/ 132kV (2x200 MVA transformers) at Palatana 29. 50 MVAR line reactors in each ckt of Pallatana- Silchar 400 kV D/C line at Pallatana end954 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 30. 80 MVAR bus reactor at Pallatana GBPP 31. LILO of both ckts of Silchar - Bongaigaon 400kV D/C line at Guwahati New (Azara) 32. Establishment of New Guwahati (Azara) 400/220kV substation (2x315 MVA) 33. 63 MVAR line reactors in each ckt of Azara- Bongaigaon 400 kV D/C line at Azara end 34. 63 MVAR bus reactor at Azara end 35. LILO of both ckt of Agia – Guwahati 220 kV D/C at Guwahati New (Azara) PG 36. LILO of one ckt of Silchar-Bongaigaon 400 kV D/C line at Byrnihat 37. Establishment of Byrnihat 400/220kV S/S (2x315 MVA) 38. 63 MVAR line reactor at Byrnihat for Silchar-Byrnihat line 39. 63 MVAR bus reactor at Byrnihat 40. BTPS-(NTPC)-Bongaigaon S/S(PG) 400kV D/c line 41. Pallatana-silchar 400kV D/c line 42. Silchar-Bongaigaon 400kV D/c line 43. Pallatana - Surajmani Nagar 400kV D/c line (charged at 132kV) Table No: NER-AS-03 Namrup+ Ext (100MW) 1. Namrup – Tinsukia 220kV D/C line (State Sector) 2. Namrup – Lakwa 132kV D/c line 3. LILO of Namrup –Tinsukia 220kV S/C line at Bodubi Table No: NER-ML-01 New Umtru (40 MW) (State Sector) New Umtru HEP – Norbong 132kV D/C Table N o: NER-MZ-01 Tuirial HEP (2x30 MW) 1. Tuirial –Kolasib 132kV S/C (operated at 33kV) (existing) (Central Sector) 2. LILO of Jiribem – Aizawl 132kV S/C at Tuirial HEP Table No: NER-TR-01 ATS for Pallatana Gas Pallatana Gas (726.6 1. Palatana – Silchar 400kV D/C line MW) 2. Silchar- Bongaigaon 400kV D/c line Table No: NER-TR-02 Monarchak(105 MW) 1. Monarchak-Badarghat-Kumarghat-Badarpur Sw. Stn 132kV D/c line (Central Sector) 2. Monarchak-Rabindra nagar 132kV D/c line 3. Establishment of Rabindra Nagar 132/33kV Substation (2x25 MVA) 4. Establishment of Badarghat (Agartala New) 132/33kV Substation (2x25 MVA) North-Eastern Region – System Strengthening Schemes of STUs: Table No: NER-SS-ArP System Strengthening in 1. Khupi - Seppa 132kV S/c on D/C line Arunachal Pradesh (Phase-I) 2. Seppa-Sagali 132kV S/c on D/C line 3. Sagali-Naharlagun 132kV S/c on D/C line 4. Naharlagun-Gerukamukh 132kV S/c on D/C line 5. Gerukamukh – Likabali 132kV S/c on D/C line 6. Likabali – Niglok 132kV S/c on D/C line 7. Niglok-Pasighat 132kV S/c on D/C line 8. Deomali – Khonsa 132kV S/c line 9. Khonsa – Changlong 132kV S/c line 10. Changlang – Jairampur 132kV S/c line 11. Jairampur - Miao 132kV S/c on D/C line¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 955 12. Miao - Namsai (PG) 132kV S/c on D/C line 13. Teju-Halaipani 132kV S/c on D/C line 14. Naharlagun-Banderdewa132kV S/c on D/C line 15. 132/33kV S/s at Seppa, Sagali, Naharlagun, Gerukamukh, Likabali, Niglok, Pasighat, Khonsa, Changlang, Jairampur, Miao, Halaipani, Banderdewa System Strengthening in 1. Palin-Koloriang 132kV S/c line Arunachal Pradesh (Phase-II) 2. LILO of Ziro-Daporijo 132 kV S/C at Basar 3. Roing - Anini 132kV S/c on D/C 4. Along - Reying 132kV S/c on D/C 5. Along - Yingkiong 132kV S/c on D/C 6. Establishment of Palin 132/33kV substation (7x5 MVA single Phase) 7. Establishment of Koloriang 132/33kV Substation (7x5 MVA single Phase) 8. Establishment of Basar 132/33kV Substation (7x5 MVAsingle Phase) 9. Establishment of Yingkiong 132/33kV Substation (7x5 MVA single Phase) 10. Establishment of Roing 132/33kV Substation (7x5 MVA single Phase) 11. Establishment of Reying 132/33kV Substation (7x5 MVA single Phase) 12. Establishment of Anini 132/33kV Substation (4x5 MVA single Phase) 13. Ziro 132/33kV Substation (Aug.) (4x8 MVA) 14. Daporijo 132/33kV Substation (Aug.) (2x12.5 MVA) 15. Along 132/33kV Substation (Aug.) (7x5 MVA) 16. Ziro - Palin 132kV S/c line Table No: NER-SS-AS System Strengthening in 1. Rangia – Amingaon 220kV D/c line Assam (Phase-I) 2. Tinsukia – Behiating (New Dibrugarh) 220kV D/c line 3. LILO of one Ckt of 220kV D/c line Samaguri – Sarusajai line at Jawaharnagar 4. Kahilipara – Guwahati Medical College132kV D/c line 5. Samaguri – Jakhalabandha 132kV S/C on D/C 6. Sibsagar – Moran 132kV S/C on D/C 7. Rupai-Chapakhowa (with 4KM river crossing via Dhola) 132kV S/C on D/C 8. Lanka – Lumding 132kV S/C on D/C 9. Dhemaji – Silapathar 132kV S/C on D/C 10. Silapathar – Jonai 132kV S/C on D/C 11. 220/132kV S/S at Amingaon and Behiating 12. 220/33kV S/S at Jamaharnagar 13. 132/33kV S/S at Guwahati Medical College, Jakhalabandha, Chapakhowa, Lumding, Silapathar and Jonai 14. Augmentation of Samaguri 220/132kV S/S (3x100 MVA) System Strengthening in 1. LILO of one Ckt of BTPS - Rangia 220kV D/c line at Bornagar Assam (Phase-II) 2. LILO of one Ckt of Kathalguri - Tinsukia 220kV D/c line at Makum 3. Bornagar - Barpeta 132kV D/c line 4. LILO of Barnagar - Rangia 132kV line at Pathsala 5. LILO of Rangia - Rowta 132kV line at Tangla 6. LILO of one ckt of Rowta - Depota 132kV D/c line at Dhekiajuli 7. Amingaon - Hazo 132kV D/c line 8. Kukurmara (400/220/132) - Mirza 132kV D/c line 9. Kamakhya - Paltanbazar (UG cable) 132kV S/c line 10. Jagi Road - Nagaon 132kV D/c line 11. Nagaon - Dhing 132kV S/c line 12. LILO of one Ckt of Samaguri - Lanka 132kV D/c line at Baithalangso 13. LILO of Golaghat - Bokajan 132kV line at Sarupathar 14. LILO of Jorhat - Nazira 132kV line at Teok 15. LILO of one ckt. of Tinsukia-Margherita 132kV D/c line at Makum 16. Sonabil - Tezpur New 132kV D/c line 17. LILO of one ckt of Sonabil - Gohpurc132kV D/c line at Borgong956 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 18. LILO of Gohpur - N. Lakhimpur 132kV line at Bihpuria 19. Hailakandi - Karimganj 132kV S/c on D/C 20. Agia - Sunpora (Mankachar) 132kV S/c on D/C 21. Establishment of Bornagar 220/132kV substation (2x100 MVA) 22. Makum 220/132kV substation (Extension of Tinsukia) (2x100 MVA) 23. Establishment of Barpeta 132/33kV substation (2x25 MVA) 24. Establishment of Pathsala 132/33kV substation (2x25 MVA) 25. Establishment of Tangla 132/33kV substation (2x25 MVA) 26. Establishment of Dhekiajuli 132/33kV substation (2x25 MVA) 27. Establishment of Hazo 132/33kV substation (2x25 MVA) 28. Establishment of Mirza 132/33kV substation (2x25 MVA) 29. Establishment of Paltanbazar 132/33kV substation (2x40 MVA) 30. Establishment of Dhing 132/33kV substation (2x16 MVA) 31. Establishment of Baithalangshu 132/33kV substation (2x16 MVA) 32. Establishment of Sarupathar 132/33kV substation (2x16 MVA) 33. Establishment of Teok 132/33kV substation (2x25 MVA) 34. Establishment of Makum 132/33kV substation (2x25 MVA) 35. Establishment of Tezpur New 132/33kV substation (2x25 MVA) 36. Establishment of Borgaon 132/33kV substation (2x25 MVA) 37. Establishment of Bihpuria 132/33kV substation (2x25 MVA) 38. Establishment of Karimganj 132/33kV substation (2x25 MVA) 39. Establishment of Sunpora (Mankachar) 132/33kV substation (2x16 MVA) 40. Namrup 132/33kV substation (Aug.) (2x100 MVA) 41. Dhaligaon 132/33kV substation (Aug.) (2x40 MVA) 42. Narengi 132/33kV substation (Aug.) (2x40 MVA) 43. Samaguri 132/33kV substation (Aug.) (2x40 MVA) 44. Bokajan 132/33kV substation (Aug.) (2x25 MVA) 45. Sibasagar 132/33kV substation (Aug.) (2x40 MVA) Table No: NER-SS-MR System Strengthening in 1. Keithelmanbi (Imphal New) – Ningthoukhong 132kV D/c line Manipur (Phase-I) 2. Stringing of Yaingangpokpi - Yurembam 132kV 2nd ckt 3. LILO of Yurembam - Yaingangpokpi 132kV both ckt at Keithelmanbi (Imphal New) 4. Stringing of Yaingangpokpi - Kongba 132kV 2nd ckt 5. Stringing of Kakching - Kongba 132kV 2nd ckt 6. Stringing of Kakching - Churachandpur 132kV 2nd ckt 7. LILO of Jiribam - Aizawal 132kV S/c line at Tipaimukh 8. Tipaimukh 132/33kV S/s(2x12.5 MVA) System Strengthening in 1. Rengpang - Tamenglong 132kV S/c line Manipur (Phase-II) 2. Tamenglong - Karong 132kV S/c line and Phase-III 3. LILO of Imphal - Karong 132kV line at Gamphajol 4. Kakching - Thoubal 132kV S/c line 5. Kakching - Moreh 132kV S/c line 6. Kongba - Thoubal 132kV S/c line 7. LILO of Karong - Kohima 132kV line at Maram 8. Establishment of Tamenglong 132/33kV substation (1x20 MVA) 9. Establishment of Gamphajol 132/33kV substation (1x20 MVA) 10. Establishment of Thoubal 132/33kV substation (1x20 MVA) 11. Establishment of Moreh 132/33kV substation (2x12.5 MVA) 12. Establishment of Maram 132/33kV substation (2x12.5 MVA) 13. Jiribam 132/33kV substation (Aug.) (2nd tfr) (1x20 MVA) 14. Rengpang 132/33kV substation (Aug.) (2nd tfr) (1x20 MVA) 15. Kongba 132/33kV substation (Aug.) (2nd tfr) (1x20 MVA) 16. Ukhrul 132/33kV substation (Aug.) (2nd tfr) (1x20 MVA) 17. Ningthoukhong 132/33kV substation (upgradation of 12.5 MVA tfr) (1x20 MVA) 18. Gamphajol 132/33kV substation (Aug.)(2nd tfr) (1x20 MVA) 19. Thoubal 132/33kV substation (2nd tfr) (1x20 MVA)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 957 Table No: NER-SS-MZ System Strengthening in 1. Melriat New PG -Melriat State (#2) (Sihhmui) 132kV D/c line Mizoram (Phase-I) 2. Serchip -Melriat State (#1) 132kV S/C line 3. LILO of Zemabawk-W. Phaileng at Melriat State (#2) 132kV line 4. W. Phaileng – Marpara 132kV S/C line 5. 132/33kV S/s at Melriat State, W. Phaileng, E. Lungdar, Marapara, Lungsen and Luwngtlai System Strengthening in 1. Marpara - Lungsen 132kV S/c line routed via Thenhlum Mizoram (Phase-II) 2. Lungsen-Chawngte 132kV S/c line (charged at 33 kV) 3. Chawngte-S. Bungtlang 132kV S/c line (charged at 33 kV) 4. Lawngtlai - Tuipang 132kV S/c line (charged at 33 kV) Table No: NER-SS-TR System Strengthening in 1. Suryamani Nagar-P. K. bari 400kV D/C line (initially op. at 132 kV) Tripura (Phase-I) 2. Strengthening /Renovation/Reconductoring of PK Bari-Dharamnagar- Durlavcherra-Panchgram-Khlieriat 132kV S/C line 3. Agartala 79 Tilla – Surajmaninagar 132kV S/C line 4. Surajmani Nagar – Rokhia 132kV s/C line 5. Surajmani Nagar – Badarghat 132kV D/C line 6. LILO of PK Bari-Ambasa at Monu 132kV line 7. Surajmani Nagar - Bodhjung Nagar 132kV D/C line 8. Surajmani Nagar – Udaipur 132kVS/C line 9. Kailashar – Dharamnagar 132kV D/C line 10. Rokhia-Rabndernagar 132kV D/C line 11. Surajmaninagar (upgradable to 400kV)* 132/33kV S/S 12. Bodhjung Nagar 132/33kV S/S (25MVA) 13. Udaipur 132/33kV S/S (25MVA) 14. Monu 132/33kV S/S (15MVA), 132/1133kV S/S (10 MVA) 15. Ravindernagar 132/33kV S/s (25 MVA) System Strengthening in 1. Bodhjung Nagar - Jirania 132kV S/c line Tripura (Phase-II) 2. LILO of Agartala-Khowai 132kV line at Haizamara 3. Udaipur - Bagafa 132kV D/c line 4. Bagafa - Belona 132kV D/c line 5. Rabindranagar - Belonia 132kV D/c line 6. Belonia - Sabroom 132kV D/c line charged at 66kV 7. Jirania (2x12.5 MVA) 132/33kV Substation 8. Establishment of Jirania (1x10 MVA) 132/33kV Substation 9. (a) Establishment of Haizamara 132/33kV Substation (2x12.5 MVA) 9 .(b) Establishment of Haizamara 132/11kV Substation (2x10 MVA) 10.(a) Establishment of Bagafa 132/33kV Substation (2x12.5 MVA) 10.(b) Establishment of Bagafa 132/66kV Substation (1x30 MVA) 10.(c) Establishment of Bagafa 132/11kV Substation (2x10 MVA) 11.(a) Establishment of Belonia 132/66kV Substation (1x30 MVA) 11.(b) Establishment of Belonia 132/33kV Substation (2x25 MVA) 11.(c) Establishment of Belonia 132/11kV Substation (2x10 MVA) 12. Udaipur 132/66kV Substation(Aug.) (1x30 MVA) Table No: NER-SS-MG System Strengthening in 1. Nangalbibra - Rongkhom (Tura) 132kV S/c on D/C Meghalaya 2. LILO of one ckt of Umtru - Kyrdemkulai D/C line at Nongpoh 132kV D/C (Phase-I) line 3. Mawngap - Nongstoin – Nangalbibra 132kV D/C line 4. Cherrapunjee – Ishamati 132kV D/C line 5. LILO of both ckts of 132 kV MLHEP(Leshka)- Khliehrait D/C line at Mynkre 132/33 kV S/S (132kV 2x D/C line) 6. Killing (Byrnihat)-Mawngap-New Shillong 220kV D/C line 7. Meddipathar-Phulbari 132kV D/C line 8. Phulbari-Ampati 132kV D/C line 9. 132/33kV (2x20 MVA) S/s at Ishmati, Mynkre, Nongpoh, Phulbari, New shillong958 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 10. 220/132kV (2x160 MVA) S/S at New Shillong and Mawngap (upgrading U/C 132 kV S/S to 220 kV) 11. S/s augmentation at Umiam, EPIP –II, Rongkhon, Cherapunjee, Nongstoin and Nangalbibra Table No: NER-SS-NG System Strengthening in 1. LILO of one ckt of Dimapur-Misa 220 kV D/C line at New Kohima* Nagaland (Phase-I) 2. Mokokchung – Tuli 132kV S/c 3. LILO of Kohima-Wokha at New Kohima 132kV S/c 4. Dimapur - Jaluki via Ganeshnagar (charged at 33 kV) 132kV S/c 5. Jaluki-Peren (charged at 33 kV) 132kV S/c 6. New Kohima -Phek-Khipire (charged at 132 kV) 220kV S/C on D/C 7. New Kohima - Wokha - Mokochung - Mon (Naginimora) (charged at 132 kV) 220kV S/C on D/C 8. Wokha - Zunheboto – Mokochung 132kV S/c on D/C 9. LILO of Kohima-Meluri (Kiphire) at Pfutsero 132kV 2xD /c 10. Mokokchung - Tuensang 132kV S/c 11. 220/132kv S/S at New Kohima 12. 132/33kV S/S at Pfutsero, Phek, Zunheboto and Tuensang ------------------------¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 959 ANNEX – 7.6 TRANSMISSION SCHEME DETAILS- RENEWABLE ENERGY SOURCES IN INDIA Table No : RES-RJ-01 Solar & New Wind 1. 400/220 kV, 3 X 500 MVA and 220/132kV, 3x160 MVA with 132/33kV, 2x40/50 Power Projects in MVA Pooling Sub-Station GSS at Ramgarh (Jaisalmer) alongwith 400kV, 1x125 Rajsthan(2650 MVAR, Bus Reactor and 2x50 MVAR line Reactor for 400kV D/C Ramgarh- MW) Bhadla line 2. 400/220 kV, 3 X 315 MVA and 220/132kV, 3x160 MVA with 132/33kV, 2x40/50 (Solar -1400 MW MVA Pooling Sub-Station GSS at Bhadla (Jodhpur) alongwith 400kV, 1x125 Wind -1250 MW) MVAR Bus Reactor and 4x50 MVAR, 400kV Line Reactors for Bhadla ends of 400kV D/C Bhadla-Bikaner line, 400kV LILO Jodhpur-Merta at Bhadla. 3. Augmentation of 400kV GSS Akal by installation of 400/220 kV, 1 X 500 MVA Transformer alongwith 400kV, 2x50 MVAR Shunt Reactor (line type) for proposed 400kV Akal-Jodhpur (New) D/c line, and 1x125 MVAR 400 kV Bus Reactor. 4. Augmentation of 400kV GSS Jodhpur (New) (i) 2x50 MVAR, 400kV Shunt Reactor (line type) at 400kV GSS Jodhpur (New) for 400kV D/C Akal-Jodhpur(New) line (ii) 400kV bays at Jodhpur (New) for LILO of both ckt. of 400kV D/C Raj West LTPS-Jodhpur line. 5. Augmentation at 400kV GSS Barmer (i) 1x125 MVAR, 400kV Shunt Reactor (Bus type) at 400kV GSS Barmer (ii) 400kV bays for 400kV D/C Barmer-Bhinmal (PG) line 6. Augmentation at 400kV GSS Bikaner (i) 400kV Bays for 400kV D/C Bhadla-Bikaner line and 400kV D/C Bikaner-Sikar (PGCIL) line at Bikaner end of the lines (ii) 1x125 MVAR, 400kV Shunt Reactor (Bus type) at 400kV GSS Bikaner 7. 400kV Interconnecting Lines : (i) 400 kV D/C Ramgarh(Jaisalmer)-Akal (Jaisalmer) line (Twin Moose) (ii) 400 kV D/C Ramgarh-Bhadla line (Twin Moose) (iii) 400 kV D/C Bhadla-Bikaner line (Quad Moose) (iv) 400 kV D/C line from 400/220kV Pooling Station Bhadla to LILO point at 400kV S/C Jodhpur-Merta line (Twin Moose) (v) 400 kV D/C Bikaner-Sikar (PGCIL) line (Twin Moose) (vi) 400 kV D/C Barmer-Bhinmal (PGCIL) line (Twin Moose) (vii) LILO of both circuits of 400kV D/C Raj West-Jodhpur line at 400kV GSS Jodhpur (New) (Twin Moose) (viii) 400kV D/C Akal-Jodhpur (New) line (Quad Moose) 8. 220kV GSS at Bap and associated lines: (i) 220/132kV, 2x160 MVA & 132/33kV, 2x40/50 MVA GSS at Bap (Distt. Jodhpur) (ii) LILO of 220kV Barsingsar LTPS-Phalodi line at at Bap (iii) 220kV D/C Bap-Bhadla line 9. 220kV GSS at Kanasar and associated lines: (i) 220/132kV, 2x160 MVA & 132/33kV, 2x40/50 MVA GSS at Kanasar (Distt. Jodhpur) (ii) 220kV D/C Bhadla- Kanasar line (iii) LILO of 132kV PS1-PS2 line at proposed 220kV GSS at Kanasar (iv) LILO of 132kV PS2-PS3 line at proposed 220kV GSS at Kansar 10. Up-gradation of PS No. 2 to 132kV Grid Substation with 132/33kV, 2x20/25 MVA Transformers with associated 132kV line 11. Up-gradation of PS No. 3 to 132kV Grid Substation with 132/33kV, 2x20/25 MVA Transformers 12. Charging of 132 kV line from PS_No.5 to PS_No.1 on 132 kV voltage level via 132 kV PS_No.2 GSS , 132 kV PS_No.3 GSS and 132kV PS_No.4 GSS 13. Up-gradation of PS No. 4 to 132kV Grid Substation with 132/33kV, 2x20/25 MVA Transformers960 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Table No : RES-GJ-01 Transmission system for Solar 1. Charanka –Sankhari 400kV D/C line (ACSR Twin Moose) along projects in Charanka Solar Park with 400/220kV, 2X315 MVA Charanka substation and 400 kV, (950.5 MW) 125 MVAR bus reactor at Charanka substation. 2. 220/66 kV ,8X100 MVA Charanka Pooling Station 3. Charanka-Jangral 220kV D/C line (AI-59). 4. Around 452kms 1Cx630 sq mm of 66 kV cable for interconnection of Solar Projects in each plot of the Solar Park with Pooling Station. Table No : RES-GJ-02 Transmission system for wind 1. Jamanwada W/F S/S-Versana 220 kV D/C –(AAAC Moose projects in Gujarat (4500 MW) conductor) 2. Nakhatarana W/F S/S-Versana 220 kV D/C (AAAC Moose conductor) 3. Vandiya W/F SS – Halvad (400 kV SS) 220 kV D/C line ( Zebra conductor) 4. Kanmer W/F SS – Halvad (400 kV SS) 220 kV D/C line ( Zebra conductor) 5. Chotila W/F SS – Jasdan 220 kV D/C line ( Zebra conductor) 6. Malvan W/F SS – Chorania 220 kV D/C line ( Zebra conductor) 7. Dhanki W/F SS – Bhatia 220 kV D/C line ( Zebra conductor) 8. Bhanvad W/F SS- Bhomiyavadar 132 kV D/C line. 9. Tebhada W/F SS Nyara (Rajkot) 220 kV D/C line (AAAC Moose conductor) 10. Maliya W/F SS – Tankara 220 kV D/C line ( Zebra conductor) 11. Rojmal W/F SS – Amreli 220 kV D/C line (AAAC Moose conductor) 12. Shapur W/F SS – Halvad (400 kV SS) 220 kV D/C line (AAAC Moose conductor) 13. Kodadha W/F SS – Tharad 220 kV D/C line ( AAAC Moose conductor) 14. Patan W/F SS – Radhanpur 220 kV D/C line ( Zebra conductor) Table No : RES-GJ-03 System Strengthening for wind 1. Varsana-Halvad 400kV D/C Quad line along with 400/220kV, projects in Gujarat (4500 MW) 2x315MVA Halvad substation. 2. 220/66 kV, 100 MVA Tankara substation, 220/132 kV, 200MVA Bhatia substation, (220/66 kV, 100MVA + 220/132kV, 100MVA)Jasdan substation. 3. Bhatia-Kalavad-Kangasiyali 220kV D/C line (AAAC Moose). 4. Morbi-Tankara-Chorania 220kV D/C line (AAAC Moose). 5. Amreli-Jasdan 220kV D/C line(AAAC Moose). 6. Varsana- Bhachau- Radhanpur 220kV D/C line (AAAC Moose). 7. Nakhatrana-Varsana 220kV D/C line (ACSR Zebra). 8. Bhatia(220kV)-Bhatia(132kV) 132 kV D/C line(ACSR Panther). Table No : RES-TN-01 Wind projects in Tamil Nadu 1. Kanaraptty (TN Wind) - Kayathar 400 KV, 400 kV D/C Twin Phase-I Moose line. (existing) 2. Kayathar - Karaikudi 400 kV D/C Quad line 3. Karaikudi - Pugalur 400 kV D/C Quad line (Tirunelveli/Kayathar area-3500 MW 4. Establishment of 400/230-110 kV S/S with 2x315 MVA 400/230 Theni/ Udumalpet area – 2800 MW) kV ICT, and 2x200 MVA 400/110kV ICT at Kayathar 5. Pugalur – Sholinganallur (Ottiampakkam), 400 kV D/C Quad line 6. Tirunelveli (TNEB) (TN wind/Kanarapatty) 400/230 kV S/S (3x315 MVA) 7. Tirunelveli (TNEB) - Tirunelveli (PG) 400kV D/c quad line¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 961 8. Five numbers of 230/33 kV wind energy substations at Marandai, Sayamalai, Vagaikulam, Kumarapuram, Sankaralingapuram and one 230/110 kV Samugarangapuram substation with associated 230 kV lines connecting with the Kanarpatti 400 kV S/S. *This system was planned in 2007 for completion in 11th Plan. The system is yet to be completed. Table No : RES-TN-02 Wind projects in Tamil Nadu Phase-II 1. Thappagundu 400/110 KV (5x200MVA) S/s in Theni area 2. Anaikadavu 400/230-110 KV (2x315+ 2x200 MVA) (Tirunelveli/Kayathar area-2500 MW S/s in Udumalpet area Theni/ Udumalpet area – 3300 MW) 3. Rasipalayam 400/230-110 S/s (2x315+2x200 MVA) in Udumalpet area 4. Anaikadavu- Rasipalayam 400kV D/c line. 5. Thappagundu- Anaikadavu 400kV D/c with one ckt LILO at Udumalpet 400/220 kV (PGCIL) substation. 6. Rasipalayam -Singarapet 400kV 2xD/c line 7. Vagrai 400/230-110 kV substation. 8. Vagrai-Rasipalayam 400 kV D/c line 9. Thennampatti 400/230-110 kV substation 10. Thennampatti - Kayathar 400kV D/C line System for additional inter-connection with L ILO of one Rasipalayam -Singarapet 400kV D/c line at ISTS and increased reliability Salem 765/400kV (POWERGRID) substation Table No : RES-AP-01 Wind projects in Andhra Pradesh (3150 MW) 1. 400/220 kV Substation at Hindupur (3x315MVA) 2. 400/220 kV Substation at Kondapuram (4x315MVA) 3. 400/220 kV Substation at Uravakonda (4x315MVA) 4. Uravakonda-Mahbubnagar 400 kV Quad DC Line 5. Uravakonda-Hindupur 400 kV DC Line 6. Uravakonda-Kondapur 400 kV DC Line 7. Kondapur – Kurnool 400kV quad DC line 8. Hindupur (400kV) S/S -Hindupur/ Gollapuram(existing) 220kV DC line 9. Urvakonda (400kV) S/S - Kalyandurg(existing) 220kV D/C line 10. Kondapur (400kV) S/S - Tadipatri(existing) 220kV D/C line 11. 220/132 kV, 2x100 MVA Substation at Jammalamadugu, Penukonda and Porumamilla 12. connectivity of Jammalamadugu, Penukonda and Porumamilla 220/1323kv S/s with existing 132/33kV S/Ss Table No : RES-KR-01 Wind projects in Karnataka LILO of Munirabad - Davangere (Guttur) 400 kV S/C line at (600 MW) Doni962 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] ANNEX – 7.7 TRANSMISSION SCHEME DETAILS – FOR POWER PROJECTS IN BHUTAN, BANGLADESH AND NEPAL Table No: BH-01 Phunatsangchu St-I (1200 1. Punatsangchu I - Lhamoizingkha (Bhutan Border) 2X 400 kV D/c line MW) 2. Lhamoizingkha (Bhutan Border) – Alipurduar 400kV D/C with Quad Moose Conductor 3. LILO of 220 kV Bosochhu-II-Tsirang S/c line at Punatsangchu-I 4. 3x105 MVA ICT at Punatsangchu 5. 1x80 MVAR Bus reactor at Punatsangchu Table No: BH-02 Phunatsangchu St-II(990 LILO of Punatsangchu I - Lhamoizingkha (Bhutan Border) 400 kV D/c line at MW) Punatsangchu-II Table No: BH-03 Mangdhechu (720MW) 1. Mangdhechu HEP-Goling 400kV 2XS/c line 2. Goling-Jigmeling 400kV D/c line 3. Jigmeling-Alipurduar 400kV D/c line(Quad) Table No: BH-04 Indian Grid Strengthening 1. New 2x315 MVA ,400/220kV AC & HVDC S/S with ±800kV, 3000MW for import of Bhutan converter module at Alipurduar. Surplus 2. Extension of ±800 kV HVDC station with 3000 MW inverter module at Agra 3. LILO of ±800kV,6000MW Bishwanath Chariyali – Agra HVDC Bi-pole line at Alipurduar for parallel operation HVDC terminal with 400/220kV at Alipurduar 4. LILO of Bongaigaon – Siliguri 400kV D/C Quad Moose line at Alipurduar 5. Lhamoizingha/Sunkosh –Alipurduar 400kV D/C (1st) Quad moose line (Indian portion) 6. LILO of Tala – Siliguri 400kV D/C line at Alipurduar 7. LILO of Birpara-Salakati 220kV D/C line at Alipurduar TRANSMISSION SCHEME DETAILS – CROSS BORDER INTERCONNECTION BETWEEN INDIA AND BANGLADESH GRID Table No: BG-01 Cross border India portion: interconnection between (to be implemented by POWERGRID) India and Bangladesh 1. Baharampur (India)-Bheramara (Bangladesh) 400kV D/C line Grid for facilitating 2. LILO of Farakka - Jeerat 400kV S/C line at Baharampur exchange of power up to 3. Establishment of 400kV Switching Station at Baharampur 500 MW between the two Bangladesh portion: countries (to be implemented by Power Grid Company of Bangladesh Ltd.) 1. Baharampur (India)-Bheramara (Bangladesh) 400kV D/C line 2. LILO of Ishurdi - Khulna South 230kV D/C line at Bheramara 3. Establishment of 1x500MW HVDC back-to-back Station and 230kV Switching Station at Bheramara TRANSMISSION SCHEME DETAILS – CROSS BORDER INTERCONNECTION BETWEEN INDIA AND NEPAL GRID Table No: NP-01 Cross border kV 400kV Muzaffarpur (India)- Dhalkebar (Nepal) D/C link interconnection between India and Nepal Grid for (Indian portion- 87km by CPTC (JV) , Nepal portion- 39km) facilitating exchange of powerbetween the two countries **********¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 963 CHAPTER - 8 PERSPECTIVE TRANSMISSION PLAN 8.1 PERSPECTIVE TRANSMISSION PLANS The perspective transmission plans cover major transmission corridors planned for: - thermal generation projects identified near pit heads(for local coal) and at coastal locations (for imported coal), - identified hydro projects on river basins in northern and eastern regions, - perspective wind and solar generation projects, - identified hydro projects in Arunachal Pradesh (NER), and - import of power from perspective generation projects in Bhutan, Nepal and Myanmar. The transmission system identified in these plans may be implemented in next 5 to 15 year time period. As the demand/generation scenario evolves in this time period, the transmission plans would be firmed up and implemented matching with schedule of generation projects. 8.2 EVOLUTION OF HIGH CAPACITY POWER TRANSMISSION CORRIDORS 8.2.1 Most of the generation projects, for which system strengthening has been identified under LTA process, are mainly located in the States of Orissa, Chhattisgarh, Sikkim, Jharkhand, Madhya Pradesh, coastal Andhra Pradesh and Tamil Nadu. While processing these applications readiness of generation projects was examined in association with the constituents of concerned regions. For the generation projects having no firm beneficiaries, transmission system requirement was worked out on the basis of target beneficiaries/regions. Based on the information furnished by such applicants(totaling to about 62000 MW of installed capacity), eleven(11) numbers of High Capacity Power Transmission Corridors (HCPTC) comprising of HVDC, 765kV AC and 400kV AC systems have been planned. These are depicted in following figure (Fig. – 8.01) :964 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] The above transmission corridors were planned considering long term requirement in the generation clusters and would be commissioned progressively matching with commissioning of associated generation projects. Generation-wise transmission elements of these corridors are also given under the various transmission schemes detailed in chapter 7. Corridor-wise details are given below: 8.2.2 High Capacity Power Transmission Corridor – I (HCPTC-I) : “Transmission System Associated with IPP projects in Orissa” Associated Generation Projects: Sl. Generation Developer/ Installed Capacity (MW) No. Open Access Applicant 1 Sterlite Energy Ltd 2400 2 GMR Kamalanga Energy Ltd 1050 3 Navabharat Power Pvt. Ltd 1050 4 Monet Power Company Ltd 1050 5 Jindal India Thermal Power Ltd 1200¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 965 6 Lanco Babandh Power Pvt Ltd 2640 7 Ind Barath Energy(Utkal) Ltd 700 Total 10090 HCPTC-I consists of following transmission systems: I. Transmission System for Phase-I Generation Projects in Orissa - Part-A • Angul Pooling Station – Jharsuguda Pooling Station 765 kV 2xS/c line • LILO of Rourkela – Raigarh 400 kV D/c at Jharsuguda Pooling station • LILO of Meramundali – Jeypore 400 kV S/c line at Angul pooling station • LILO of one ckt of Talcher – Meramundali 400 kV D/c at Angul pooling station • Establishment of 765/400 kV Pooling Station at Jharsuguda • Establishment of 765/400 kV Pooling Station at Angul II. Transmission System for Phase-I Generation Projects in Orissa - Part-B • Jharsuguda Pooling Station – Dharamjaygarh / near Korba (WR) 765 kV D/c line • LILO of Ranchi – WR Pooling (near Sipat) 765 kV S/c line at Dharamjaygarh / near Korba • Dharamjaygarh / near Korba – Jabalpur Pool 765 kV D/c line • Jabalpur Pooling Station – Jabalpur 400 kV D/c (high capacity) line • Establishment of 765 kV sub-station at suitable location near Dharamjaygarh /Korba • Establishment of 765/400 kV Pooling Station at Jabalpur III. Transmission System for Phase-I Generation Projects in Orissa - Part-C • Jabalpur Pooling Station – Bina 765 kV D/c line • Bina – Gwalior 765 kV S/c (3rd circuit) line • Gwalior – Jaipur 765 kV S/c line • Jaipur – Bhiwani 765 kV S/c line IV. Under Private Sector – Part-D • Establishment of 2x1500MVA, 765/400kV Bhopal Pooling Station • Jabalpur Pool – Bhopal – Indore 765kV S/c • Bhopal New substation – Bhopal (M.P.) 400kV D/c (high capacity) 8.2.3 High Capacity Power Transmission Corridor – II (HCPTC-II) : “Transmission System Associated with IPP projects in Jharkhand” Associated Generation Projects: Sl. No. Generation Developer/ Installed Capacity (MW) Open Access Applicant 1. Adhunik Power & Natural Resources Limited 540 2. Essar Power (Jharkhand) Ltd. 120 0 3. Corporate Power Limited Ph-I 540 4. Corporate Power Limited Ph-II 540 5. WBSEDCL - Surplus from State Sector Projects 1000 of West Bengal Total 3820 HCPTC-II consists of following transmission systems: I Transmission System for Phase-I Generation Projects in Jharkhand & West Bengal : Part-A • Ranchi – Gaya 400 kV (Quad) line via pooling station proposed near Essar / Corporate generation projects • Ranchi New (765/400kV S/s) - Dharamjayagarh 765kV S/c • Establishment of 400kV Pooling Station (Jharkhand Pool) near Essar and Corporate generation projects(depending upon progress of Essar and Corporate IPPs ). This will be a switching station without ICTs. II Transmission System for Phase-I Generation Projects in Jharkhand & West Bengal : Part-B • New 2x1500 MVA, 765/400 kV substation at Varanasi and Kanpur • Gaya – Varanasi 765 kV S/c966 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] • Varanasi - Balia 765 kV S/c line ** • Varanasi – Kanpur 765 kV D/c • Kanpur – Jhatikra 765 kV S/c • 400kV connectivity for new 765/400kV S/s at Varanasi & Kanpur • Varanasi - Sarnath (UPPCL) 400kV D/c (quad) • LILO of Sasaram - Allahabad 400kV line at Varanasi • Kanpur (765/400kV) - Kanpur (Existing) 400kV D/c (quad) * * Varanai – Balia 765kV S/c has been subsequently been replaced in place of LILO of one ckt. Of Tillaiya/Gaya – Balia 765kV line at Varanasi III Common Strengthening Transmission System for Transfer of power from generation projects in Jharkhand to NR/WR under the Scope of Private Sector • Dharamjaygarh – Jabalpur 765kV D/c (2nd line) 8.2.4 High Capacity Power Transmission Corridor – III (HCPTC-III) : “Transmission System Associated with IPPs projects in Sikkim” Associated Generation Projects: Sl. Generation Developer/ Installed Capacity No. Open Access Applicant (MW) 1 Teesta Urja Ltd. / PTC 1200 2 Lanco Energy Pvt. Ltd. 500 3 DANS Energy Pvt. Ltd. 96 4 JAL Power Corporation 120 5 Madhya Bharat Power Corporation Ltd. 96 6 Gati Infrastructure Ltd 99 7 Gati Infrastructure Bhasmey Power Pvt. Ltd. 51 Total 2162 MW HCPTC-III consists of following transmission systems: I Transmission System for development of pooling station at Kishanganj in Northern part of West Bengal/Bihar – PART A • LILO of Siliguri (Existing) – Purnea 400kV D/c line(quad) at new pooling station Kishanganj • LILO of Siliguri (Existing) – Purnea 400kV D/c line(on which reconductoring is being carried out) at Kishanganj with the higher capacity(HTLS) conductor • LILO of Siliguri – Dalkhola 220kV D/c line at new pooling station in northern part of West Bengal / Bihar • LILO of Gangtok-Melli 132kV S/c line upto Rangpo pooling point, where Chuzachen- Rangpo 132kV D/c would be connected so as to form Chuzachen-Gangtok and Chuzachen-Melli 132kV S/c lines. • New 2x315 MVA, 400kV sub-station at Kishanganj along with associated bays. II Transmission System for development of pooling substations within Sikkim and transfer of power to a new pooling station Kishanganj in northern Part of West Bengal/Bihar – PART B • LILO of Teesta III – Kishanganj 400kV D/c line(quad) at New Melli • Rangpo – New Melli 220kV D/c line (with twin Moose conductor) • LILO of Gangtok-Rangit 132kV S/c line at Rangpo and termination of Gangtok- Rangpo/Chujachen and Melli – Rangpo/Chujachen 132kV lines (constructed under part-A through LILO of Gangtok-Melli 132kV S/c line upto Rangpo) at Rangpo substation • LILO of Teesta V – Siliguri 400kV D/c line at New Melli • Kishanganj – Patna 400kV D/c (quad) line • Establishment of 220/132kV, 3x100MVA Gas Insulated Substation at Rangpo • Establishment of 10x167MVA, 1 phase, 400/220kV Gas Insulated substation at New Melli.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 967 8.2.5 High Capacity Power Transmission Corridor – IV (HCPTC-IV) : “Transmission System Associated with IPPs near Bilaspur complex in Chhattisgarh & MP projects” Associated Generation Projects: Sl. Generation Developer/ Installed Capacity No. Open Access Applicant (MW) Chhattisgarh IPP 1. Maruti Clean Coal(1X300 MW) 300 2. Dheeru Power Gen (3x350 MW) 1050 3. Chhattisgarh State Power Trading Co. Ltd Sub-total 1350 Madhya Pradesh IPP 4. Jaiprakash Power Ventures Ltd. (2x660 MW) 1320 5. Aryan MP Power generation Pvt. Ltd (2x600 MW) 1200 6. Bina Power Supply Company Ltd. (2x250 MW) 500 Sub total 3020 Total 4370 HCPTC-IV consists of following transmission system: • Indore- Vadodra 765kV S/c • Vadodra – Pirana 400kV D/c (Quad) • Establishment of 765/400kV, 2x1500 MVA substation at Vadodra 8.2.6 High Capacity Power Transmission Corridor – V (HCPTC-V) : “Transmission System Associated with Chhattisgarh IPP projects” Associated Generation Projects: Sl. Generation Developer/ Installed Capacity No. Open Access Applicant (MW) RAIGARH(KOTRA) COMPLEX 1 RKM Powergen Ltd.(4x360) 1440 2 Athena Chhattisgarh Power Ltd.(2x600) 1200 3 SKS Power Gen. (Ch) Ltd.(4x300) 1200 4 Korba West Power Co. Ltd.(1x600) 600 5 DB Power Ltd.(2x600) 1200 6 Visa Power Ltd. 1200 sub-total 6840 RAIGARH(TAMNAR) COMPLEX 1 Jindal Power Ltd.(4x600) 2400 2 Jindal Power Ltd. (225 MW from Dongamahua CPP+ 175MW 400 from existing Tamnar TPS 3 TRN Energy Pvt. Ltd.(2x300) 600 sub-total 3400 JANJGIR-CHAMPA COMPLEX 1 KSK Mahanadi Power Co. Ltd (6x600) 3600 2 BALCO(4x300) 1200 3 Vandana Vidyut Ltd.(2x135+1x270) 540 4 Lanco Amarkantak Power Pvt. Ltd.(2x660) 1320 sub-total 6660 RAIPUR COMPLEX 1 GMR Chhattisgarh Energy Pvt. Ltd. 1370 1 Chhattisgarh State Power Trading Co. Ltd Total 18270968 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] HCPTC-V consists of following transmission system: I Common transmission system strengthening to be implemented by POWERGRID • Raigarh Pooling Station (Near Kotra) – Raipur Pooling Station 765kV D/c line • Champa Pooling Station – Dharamjaygarh Pooling Station 765kV S/c line • Champa Pooling Station – Raipur Pooling Station 765kV D/c line • Raigarh Pooling Station(Near Kotra) – Champa Pooling Station 765kV S/c line • Raigarh Pooling Station (Near Tamnar) – Raigarh Pooling Station(near Kotra) 765kV D/c line • Raigarh Pooling Station(Near Kotra) – Raigarh(PG) 400kV D/c(to be opened at later date) line • Raipur Pooling Station – Raipur (PG)400kV D/c (to be opened at later date) line • Raipur Pooling Station – Wardha 765kV 2xD/c line • Wardha – Aurangabad (PG) 765kV 2xD/c line • Aurangabad(PG) – Padghe(PG) 765kV D/c line • Aurangabad(PG) – Boisar 400kV D/c(Quad) line • Padghe(PG)- Padghe(MSTECL) 400kV D/c(Quad) line • ±600kV, 4000MW HVDC bipole between Raigarh Pooling Station(Near Kotra) – Dhule(PG) line • Vadodara – Asoj(GETCO) 400kV D/c(Quad) line • ±800kV, 3000MW HVDC bipole between Champa Pooling Station Kurukshehtra(NR) with provision to upgrade to 6000MW at a later date • Dhule(PG) – Dhule(New) 400kV D/c(Quad) line • Dhule(PG) – Malegaon (MSETCL) 400kV D/c(Quad) line • Dhule(PG) – Nasik(MSETCL) 400kV D/c(Quad) line • Establishment of 400/220kV, 2x315MVA substation at Dhule(PG) • Establishment of 765/400kV 4x1500MVA Raigarh Pooling Station(near Kotra) • Establishment of 765/400kV 3x1500 MVA Raigarh Pooling Station(near Tamnar) • Establishment of 765/400kV 6x1500MVA Champa Pooling Station • Establishment of 765/400kV 1x1500MVA Raipur Pooling Station • Establishment of 4000MW 600KV HVDC bipole terminal each at Raigarh Pooling station(near Kotra) and Dhule(PG) respectively. • Establishment of 3000MW + 800KV HVDC bipole terminal each at Champa Pooling station and Kurukshetra(NR) respectively (provision to upgrade the terminals at 6000MW at a later date). • Establishment of 765/400kV 2x1500MVA Padghe(PG) GIS S/s • Establishment of 765/400kV 2x1500MVA Aurangabad(PG) S/s Strengthening in Northern region • Kurukshetra(NR) - Jallandhar 400kV D/c(Quad) one ckt. via 400/220kV Nakodar S/s • LILO of Abdullapur – Sonepat 400kV D/c(triple) at Kurukshetra • Establishment of 400/220kV 2x500 MVA S/s at Kurukshetra II Common transmission system strengthening under tariff based competitive bidding • Aurangabad(PG) – Dhule (New) 765kV S/c line • Dhule (New) – Vadodara 765kV S/c line • Dhule (New) – Dhule (MSETCL) 400kV D/c Quad line • Establishment of 765/400kV, 2x1500MVA Dhule(New) S/s 8.2.7 High Capacity Power Transmission Corridor – VI (HCPTC-VI) : “Transmission System Associated with IPPs in Krishnapatnam Area, Andhra Pradesh”¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 969 Associated Generation Projects: Sl. Generation Developer/ Installed Capacity (MW) No. Open Access Applicant 1 Simhapuri Energy Private Limited 600 2 Meenakshi Energy Private Limited 600 3 Thermal Powertech Corporation India Limited 1320 4 Meenakshi Energy Private Limited 400 5 NCC Power Projects Limited 1320 Total 4240 HCPTC-VI consists of following transmission system: • Establishment of 765/400 kV, 2x1500 MVA pooling station at Nellore by LILO of Simhapuri- Nellore 400 kV D/c quad line • Nellore Pooling station – Kurnool 765 kV D/c line • Kurnool – Raichur 2nd 765 kV S/c line • Associated 765 kV & 400 kV bays at Nellore Pooling station, Kurnool and Raichur stations. 8.2.8 High Capacity Power Transmission Corridor – VII (HCPTC-VII) : “Transmission System Associated with IPP projects in Tuticorin Area, Tamil Nadu” Associated Generation Projects: Sl. No. Generation Developer/ Installed Capacity (MW) Open Access Applicant 1 Coastal Energen Private Limited 1200 2 Ind-Barath Power (Madras) Limited 1320 Total 2520 HCPTC-VII consists of following transmission system: • Establishment of 765 kV pooling station in Tuticorin and Salem (initially charged at 400 kV) • LILO of both circuits of Tuticorin JV – Madurai 400 kV D/c (quad) line at Tuticorin Pooling Station • Tuticorin Pooling station – Salem Pooling station 765 kV D/c line initially charged at 400 kV. • Interconnection of Salem pooling station with existing Salem 400/230 kV substation through 400 kV D/c (quad) line. • Salem pooling station – Madhugiri pooling station 765 kV S/c initially charged at 400 kV. 8.2.9 High Capacity Power Transmission Corridor – VIII (HCPTC-VIII) : “Transmission System Associated with IPP projects in Srikakulam Area, Andhra Pradesh” Associated Generation Projects: Sl. No. Generation Developer/ Installed Capacity (MW) Open Access Applicant 1 East Coast Energy Private Limited 1320 Total 1320 HCPTC-VIII consists of following transmission system: • Establishment of 2x1500 MVA, 765/400 kV Pooling station at Srikakulam • Provision of 1x1500 MVA, 765/400 kV ICT at Angul • Srikakulam Pooling Station – Angul 765kV D/c (initially charged at 400kV) • Angul – Jharsuguda – Dharamjaigarh 765 kV D/c line • Associated 400kV bays at Srikakulam & Angul substations • Associated 765 kV bays at Angul, Jharsuguda & Dharamjaigarh substations. 8.2.10 High Capacity Power Transmission Corridor – IX (HCPTC-IX) :970 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] “Transmission System Associated with IPP projects in Southern Region, for transfer of power to other regions” Associated Generation Projects: Sl. No. Generation Developer/ Installed Capacity (MW) Open Access Applicant 1 Lanco Kondapalli Power Private Ltd. 366 2 Simhapuri Energy Private Limited 600 3 Meenakshi Energy Private Limited 600 4 Thermal Powertech Corporation India Limited 1320 5 Meenakshi Energy Private Limited 400 6 NCC Power Projects Limited 1320 7 Coastal Energen Private Limited 1200 8 Ind-Barath Power (Madras) Limited 1320 9 East Coast Energy Private Limited 1320 Total 8446 HCPTC-IX consists of following transmission system: • Sholapur – Pune 765 kV 2nd S/c (1st circuit already covered under transmission associated with Krishnapatnam UMPP). • Establishment of 2x1000MVA 765/400 kV station at Orai by LILO of one circuit of Satna – Gwalior 765 kV line. • Establishment of 2x1500MVA 765/400 kV station at Bulandshahar by LILO of Agra – Meerut 765 kV line. • Establishment of 2x1500MVA 765/400 kV station at Sonipat by LILO of Bhiwani – Meerut 765 kV line. • Jabalpur Pooling station – Orai 765 kV S/c line. • Orai – Bulandshahar – Sonipat 765 kV S/c line. • Orai-Orai (UPPCL) 400kV D/c (Quad) line • Sonipat-Kurushetra 400kV D/c (Quad) line • Sonipat (New) - Sonipat (Under Construction) 400kV D/c (Quad) line • Bulandshahr - Hapur (UPPCL) 400kV D/c (Quad) line 8.2.11 High Capacity Power Transmission Corridor – X (HCPTC-X) : “Transmission System Associated with IPP projects in Vemagiri Area, Andhra Pradesh” Associated Generation Projects: Sl. Generation Developer Installed Capacity No. (MW) 1 Samalkot Power Limited (Earlier Reliance Infrastructure Ltd.) 2400 2 Spectrum Power Generation Limited 1400 3 GMR Rajahmundry Energy Limited 768 Total 4568 HCPTC-X consists of following transmission system: • Establishment of 765/400kV GIS Pooling station at Vemagiri with 4x1500 MVA transformer • LILO of Gazuwaka – Vijayawada 400kV S/c line at Vemagiri Pooling Station • Establishment of 765/400kV GIS Pooling station at Khammam & Hyderabad with 2x1500 MVA transformers each • Hyderabad 765/400 kV S/s – Hyderabad (existing) 400 kV D/c (quad) line • Khammam 765/400 kV S/s – Khammam (existing) 400 kV D/c (quad) line • Hyderabad – Wardha 765 kV D/c line • Vemagiri Pooling Station – Khammam 765kV 2xD/c line¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 971 • Khammam – Hyderabad 765kV 2xD/c line • Wardha – Jabalpur Pooling Station 765 kV D/c line • 8.2.12 High Capacity Power Transmission Corridor – XI (HCPTC-XI) : “Transmission System Associated with IPP projects in Nagapattinam / Cuddalore Area, Tamil Nadu” Associated Generation Projects: Sl. Generation Developer Installed Capacity (MW) No. 1 IL & FS Tamil Nadu Power Company Limited 1200 2 PEL Power Limited 1050 Total 2250 HCPTC-XI consists of following transmission system: • Establishment of 765/400kV GIS Pooling station at Nagapattinam with 4x1500 MVA transformer • LILO of Neyveli – Trichy 400kV S/c line at Nagapattinam Pooling Station for interim arrangement which later shall be bypassed • Establishment of 765/400kV GIS Pooling station at Narendra & Kolhapur with 2x1500 MVA transformers each • Provision of 2x1500 MVA, 765/400 kV transformers each at Madhugiri and Salem • Narendra – Kolhapur 765kV D/c line • LILO of both circuits of Kolhapur – Mapusa 400 kV D/c line at Kolhapur 765/400 kV S/s • Charging of Salem – Madhugiri 765 kV S/c line – 1 (planned with Tuticorin LTOA projects) at its rated voltage • 400 kV interconnection between Narendra (existing) and Narendra 765/400 kV GIS S/s • Nagapattinam Pooling Station – Salem 765kV D/c line • Salem – Madhugiri 765 kV S/c line • Madhugiri – Narendra 765kV D/c line • Kolhapur – Padghe 765 kV D/c one circuit via Pune. 8.3 PERSPECTIVE TRANSMISSION PLAN FOR EVACUATION OF POWER FROM RENEWABLE ENERGY SOURCES 8.3.1 Perspective Plan for Wind and Solar Generations Considering the Wind and Solar potential estimates and impetus being given on development of renewable generation, a perspective transmission plan for renewable, indicating broad transmission corridors has been prepared. For this, an assessment has been carried out for RE contribution into power supply scenario for 2030. Wind and solar generation potential is mainly available in six states i.e. Tamil Nadu, Andhra Pradesh, Karnataka, Maharashtra, Gujarat and Rajasthan. Based on the assumptions of the past growth trends in RE capacity addition and potential of above resources it is estimated that a total of about 200 GW of capacity may be available by end of 2030. Out of this, wind may be of the order of 165 GW and solar 35 GW. The planned transmission corridors would need to pick up surplus power from these states and transmit up to deficit states integrating with transmission corridor being planned for hydro generation projects so as to balance intermittency of wind/solar power with hydro power. 8.3.2 High Capacity Corridors for Wind and Solar Generations Details of identified high capacity transmission corridors for perspective wind and solar generation are as under: 1. 765kV Tamil Nadu (SR) RE complex- Maharashtra/Gujarat (WR)- Rajasthan- Haryana/Delhi (NR) D/c972 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 2. +800kV, 6000 MW (Multi terminal) Tamil Nadu/Karnataka RE complex- Uttar Pradesh load centres HVDC Bipole 3. 765kV Karnataka (SR) RE complex- Maharashtra/Madhya Pradesh (WR)- Uttar Pradesh/Uttaranchal- Punjab (NR) load centres D/c 4. 765kV Tamil Nadu /AP (SR) RE complex – Orrisa (ER)– Jharkhand (ER)– Bihar (ER)– UP/Punjab (NR) Load centres D/c 5. 765kV Gujarat RE complex – Rajasthan- Haryana/Delhi (NR) D/c 6. +800kV 6000 MW (Multi terminal) Gujarat - Rajasthan RE complex – Punjab load centres HVDC Bipole 7. 765kV Rajasthan RE complex (Jaisalmer/Barmer)– Central Rajasthan – Punjab-J&K load centres D/c. These transmission corridors would be firmed up considering progress of RE generation, surplus in the home State and willingness of producers/States to export out of their State. A schematic of above high capacity transmission corridors is depicted in following figure (Fig – 8.02)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 973 Figure 8.02 J& K 900MW : Perspective Transmission Plan Jammu & For RE Capacity by 2030 Kashmir Complex Rajas tha 6 n 28GW : Jaisalme 7 5 Gujarat 34G W : 3 Kutch Complex 2 MAHARA SHTRA 44GW : High Capacity Corridor Satara & Sangli Complex 765kV AC Corridor HVDC Corridor 1 AndhraPradesh Karnataka 20GW : Urvakonda & 19GW : Kondapuram Complex Chitradurga Complex Gas TamilNadu 54GW: Udumalpet & Load Centers Kayathar Complex Wind/Solar Wind/SHP974 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 8.4 MASTER PLAN FOR EVACUATION OF POWER FROM HYDRO ELECTRIC PROJECTS IN UPPER PART OF SATLUJ BASIN AND SPITI VALLEY (SATLUJ BASIN) The list of identified hydro projects in this basin is given below: Sl. Name of Project Installed Capacity, No. MW 1 SHPs 142 2 Shongtong Karcham 450 3 Kashang-I 65 4 Kashang-II & III 65 + 65 5 Kashang-IV 48 6 Tidong-I 100 7 Chango Yangthang 140 8 Yangthang Khab 261 9 Ropa 60 10 Khab 636 11 Tidong-II 90 12 Jhangi Thopan 480 13 Thopan Powari 480 14 Sumte Khatang 130 15 Lara Sumte 104 16 Mane-Nadang 70 17 Lara 60 18 Killing-Lara 40 Total 3486 The transmission plan is depicted in following figure (Fig – 8.03): 8.4.1 Small Hydro Projcets (SHPs): Establishment of 66/220/400 kV GIS Pooling Station at Wangtoo by Mid 2014 to match commissioning of SHPs in Bhaba Khad (57 MW) and Sangla Valley (40 MW) + LILO of 220 kV Kashang- Bhaba D/c Line and LILO of both circuits of 400 kV Karcham Wangtoo-Abdullapur D/c line at Wangtoo. – Proposed Implementation through STU (HPPTCL).¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 975 Figure: 8.03 Master Plan of Evacuation System KILLING - LARA 40 MW for Projects in Satjul Basin LARA MANE-NADANG 60 MW 70 MW LARA - SUMTE 104 MW SUMTE - KHATANG 130 MW (TWIN MOOSE) CH 14A 0N MGO W - YANGTHANG 18 Km 4 Km GLE HTLS) 4K 0A 0 /D 2O 20G kR VI (SIN SE) O O YANGTHANG - KHAB M 261 MW WIN T ( ROPA Km 60 MW 0 5 TIDONG-II KHAB TIDONG-I 90 MW SE) 636 MW O 100 MW m MO 20 K WIN (T (SINGLE HTLS) HTLS)PP J 40A 0/N 22G 0 kI V PS D KASH (3A xN 65G +- 4I, 8II M,II WI & ) IV (QUA JANGI THOPAN - THOPAN POWARI (480+480 MW) BOGTU S/S SHONGTONG - KARCHAM BASPA-II 450 MW 300 MW KARCHAM-WANGTOO 18 Km 1000 MW WANGTOO PP BHAVA 120 MW SORANG NATHPA 100 MW JHAKRI KOTLA HARYANA/PUNJAB 1500 MW WBIRD) S/S T MO OHALI (TRIPLE SNOWBR 4 I3 RA 2 DM )MP WUR L 7U 00H ( MRTRI I WPLE SNO (TRIPLE SNO W BIR (Q U AD) 44 400 000 0 kkk V VV (Q HU TA LL D SE ) CG OE NN D.D Existing Proposed TO KUNIHAR D) 220 kV (HTLS) 220 kV NALAGARH TO ABDULLAPUR POOLING POINT SUB STATION HEP TO PATIALA/KAITHAL/ MARCH 2012 HISAR976 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] 8.4.2 Kashang-I (65 MW): Kashang-I is likely to be commissioned by 2013. For evacuation of power from Kashang-I, HP is constructing a 220 kV D/c line from Bogtu to Kashang. Accordingly, power can be evacuated through Bogtu - Bhabha 220 kV D/c line. 8.4.3 Tidong-I (100 MW): Tidong-I is under construction and is likely to be commissioned by December 2014, however, the Jangi Pooling station may not come up by that time, therefore, the Tidong-I power shall be temporarily evacuated by LILO of one circuit of 220 kV D/C Kashang- Bhaba line at Tidong-I HEP. These works shall be carried out by HPPTCL. Later on when Jangi P.S. is commissioned, Tidong-I - Jangi line shall be constructed and also Kashang – Jangi 220 kV D/c line with single HTLS conductor shall be established. These works are proposed to be carried out by HPPTCL. 8.4.4 Kashang-II (65 MW): Kashang-II (65 MW) is planned to be evacuated through 220 kV system, in case the Jangi S/S is delayed. However some constraints may be faced during contingency of outage of one circuit. Establishment of Jangi Pooling station may be taken up with further stages of Kashang. 8.4.5 Shongtong Karcham(450 MW) : o Shongtong Karcham – Wangtoo 400 kV D/c Line (Quad HTLS Conductor –Equivalent to about 3000MW) – 18 km - as ISTS o Switchyard may of GIS type and may be designed with 4000 Amps switchgear so as to handle about 2800-3000MW power planned in the upstream of the generation project. 8.4.6 Kashang-III (65 MW) & Kashang-IV (48 MW) and Tidong-II (90 MW) HEP: o Kashang-Jangi Pooling Station 220 kV D/c line (Single HTLS- Equivalent to 300 MW capacity) – by STU o 2x315 MVA (7x105 MVA units) 220/400 kV GIS Pooling Station at Jangi (with 4000 Amps. switchgear) (with space provision for 3rd ICT) - as ISTS o LILO of one ckt. of Shongtong –Wangtoo 400 kV Line at Jangi - as ISTS o Tidong – Jangi Pooling Station 220 kV D/c line - by STU 8.4.7 Chango Yangthang (140 MW): o Chango Yangthang – Proposed site of Ka Dogri Pooling Station 220 kV D/c line – 18 km - by developer o Proposed Site of Ka Dogri – Jangi Pooling Station 400 kV D/c line (Twin Moose) to be initially charged at 220 kV – 50 km - as ISTS o Provision of 3rd 400/220 kV ICT (3 nos. of 105 MVA Single Phase units) at Jangi Pooling Station - as ISTS 8.4.8 Yangthang Khab (261 MW): o 220 kV Yangthang Khab- Ka Dogri D/c Line with HTLS conductor - adequate for 300 MW capacity – 4 km - as ISTS o 2x315 MVA (7x105 MVA units) 220/400 kV GIS Pooling Station at Ka Dogri - as ISTS o Charging of Ka Dogri – Jangi line at 400 kV level - as ISTS o Direct termination of Chango Yangthang at Ka Dogri Pooling Station - by generation developer 8.4.9 Khab (636 MW): o Khab – Jangi Pooling Station 400 kV D/c line – 20 km - as ISTS 8.4.10 Jangi Thopan (480 MW) & Thopan Powari (480 MW) : o LILO of one circuit of Jangi Pooling Station – Wangtoo 400 kV D/c (Quad HTLS) line at generation project - as ISTS o Switchgear Capacity at Generation switchyard bus rating to be 4000 A. 8.4.11 Ropa (60 MW) o Direct injection to Jangi Pooling station by a 220 kV D/c line - by generation developer o The generation of SHPs in the area may be injected at Ropa Generation Switchyard.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 977 8.4.12 Other Projects of Spiti Valley (Satluj Basin) o The generation of these projects can be injected at Ka Dogri Pooling Station. o From Killing Lara (40 MW), Lara (60 MW) & Mane Nadang (70 MW), a combined 220 kV D/c line can be constructed upto Lara Sumte HEP. From Lara Sumte HEP(104MW), a high capacity 220 kV line (with twin Moose conductor) can be constructed upto Ka Dogri Pooling Station - Proposed Implementation as ISTS except for the generators below 50 MW. o Augmentation of transformation capacity would be required at Ka Dogri. Space for 2 additional ICTs of 315 MVA (105 MVA single phase units) would be required. These transformers can be provided progressively matching with the generation addition. - as ISTS NOTE: Present / Planned system beyond Wangtoo station would be capable of handling about 500-600 MW of power (to be confirmed with the development of the generation projects). One more additional high capacity line (400 kV Quad) from Wangtoo towards Haryana/Punjab shall be required which can be constructed through the right bank of the river. 8.5 MASTER PLAN FOR EVACUATION OF POWER FROM HYDRO ELECTRIC PROJECTS IN CHANDRABHAGA BASIN 8.5.1 The list of identified hydro projects in this basin is given below: Sl. Name of Project Installed Capacity, MW No. 1 Chhatru 120 2 Teling 94 3 Shangling 44 4 Jispa 300 5 Tandi 104 6 Rashil 130 7 Bardang 126 8 Tignet 81 9 Pattam 60 10 Seli 400 11 Miyar 120 12 Reoli Dugli 420 13 Sach Khas 149 14 Purthi 300 15 Duggar 236 16 SHPs 300 17 Other 500 Total 3500978 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] The transmission plan is depicted in the following figure (Fig – 8.04) The total power in this area is about 3500 MW. Out of these projects, two projects namely, Miyar & Seli are expected to come up by 2017 and three projects Chhatru, Reoli Dugli & Sach Khas are expected by 2018. The next project expected in this area would be Jispa. The status and time frame of other projects are not yet clear. Based on the progress of generation, availability of corridors, severe R-o-W constraints near Seli, quantum of power, it was considered prudent to develop two transmission corridors, one towards Hamirpur and the other towards J&K. It is proposed that the corridor to start from Seli HEP would go towards Hamirpur and the other corridor to start from Reoli Dugli would go towards J&K. The corridor capacity towards Hamirpur would be of the order of 2500 MW and corridor capacity towards J&K would be about 1500 MW.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 979 Keeping above observations in view, following transmission system is proposed which is matched with the sequence of commissioning of generation projects: CHANDRABHAGA CORRIDOR-I 8.5.2 Seli HEP (400 MW): o 400 kV D/c Line (Twin HTLS-Adequate for about 2000 MW) from Seli to the site of 400 kV Pooling Station near Sissu /Gramphu (Pooling Station may not be constructed during this time frame) - as ISTS o From site proposed near Sissu/Gramphu Pooling Station – Hamirpur 400 kV D/c (Triple HTLS – adequate for 2500 MW capacity) – For this line section, Rohtang Pass is to be crossed which would have implementation challenges due to 8-10 feet of snow at during winters and working season would be very less.. - as ISTS 8.5.3 Miyar HEP(120 MW) : o LILO of one circuit of Seli – Hamirpur (via Rohtang) 400 kV D/c line (Twin HTLS) at Miyar - Proposed Implementation as ISTS 8.5.4 Chhatru HEP (120 MW) : o Establishment of 2x315 MVA (7x105 Single Phase units) 400/220 kV GIS Pooling station near Sissu / Gramphu - as ISTS o Chhatru – Sissu / Gramphu GIS Pooling Station 220 kV D/c line (HTLS adequate for 300 MW per circuit) - as ISTS o LILO of both circuits of Seli - Hamirpur line at Sissu/ Gramphu GIS Pooling Station.- as ISTS 8.5.5 Teling & Shangling HEP (94 & 44 MW) : o LILO of one circuit of Chhatru – Sissu / Gramphu Pooling Station 220 kV D/c (HTLS) at Teling - as ISTS o LILO of one circuit of Chhatru – Sissu / Gramphu Pooling Station 220 kV D/c (HTLS) at Shangling - by STU or developer Note: The capacity of generation switchyards at Chhatru, Teling and Shangling HEPs to be equal to power handling capacity of 300 MW otherwise there would be constraints during contingency of outage of one circuit. 8.5.6 Jispa (300 MW): o Jispa – Sissu / Gramphu Pooling Station 400 kV D/c line - as ISTS 8.5.7 Bardang HEP (126 MW) : o LILO of one circuit of Seli – Sissu / Gramphu Pooling Station 400 kV D/c (Twin HTLS) - as ISTS 8.5.8 Rasil HEP (130 MW) o LILO of one circuit of Seli – Sissu / Gramphu Pooling Station 400 kV D/c (Twin HTLS) - as ISTS 8.5.9 Tandi HEP (104 MW) o LILO of one circuit of Seli – Sissu / Gramphu Pooling Station 400 kV D/c (Twin HTLS) - as ISTS 8.5.10 Pattam HEP (60 MW) : o Pattam – Miyar 220 kV D/c - as ISTS o Provision of 1x250 MVA(4 nos. of 83.3MVA Single Phase units), 220/400 kV GIS Pooling Station at Miyar. Incase of space constraints at Miyar switchyard, a separate pooling station would be required.- as ISTS 8.5.11 Tignet HEP (81 MW) o LILO of one circuit of Pattam – Miyar 220 kV D/c - as ISTS o For Pattam & Tignet HEP transmission systems, it is assumed that Pattam would be coming up prior to Tignet. In case Tignet HEP materializes before Pattam, 220 kV D/c line and provision of ICTs shall have to be matched with Tignet HEP. NOTE: (Additional system beyond Hamirpur would be planned based on the requirement / commissioning of new projects.) - as ISTS980 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] CHANDRABHAGA CORRIDOR-II 8.5.12 It was proposed that the generation projects in the downstream of Seli HEP i.e. Reoli Dugli (420 MW), Sach Khas (149 MW), Purthi (300 MW) and Duggar (236 MW) may be evacuated through Jammu region as these projects are close to that region, there are severe R-o-W constraints from Seli to Reoli Dugli and it may not be feasible / reliable to evacuate full 3850 MW through single corridor. 8.5.13 Reoli Dugli HEP (420 MW) & Sach Khas (149 MW): o Reoli Dugli– Kishtwar 400 kV D/c (Twin HTLS-Adequate for 1500 MW) - as ISTS o Establishment of 400 kV switching station at Kishtwar - as ISTS o LILO of Dulhasti / Ratle – Kishenpur 400 D/c (Quad) line at Kishtwar - as ISTS o LILO of one circuit of Reoli – Kishtwar at Sach Khas - as ISTS o Generating Switchyard capacity to be kept for 1500 MW at each Power House. 8.5.14 Purthi HEP (300 MW) o LILO of one circuit of Reoli – Kishtwar 400 kV D/c at Generating station - as ISTS o Generating Switchyard capacity to be kept for 1500 MW at Power House. 8.5.15 Duggar HEP (236 MW): o LILO of one circuit of Reoli – Kishtwar 400 kV D/c at Generating station - as ISTS o Generating Switchyard capacity to be kept for 1500 MW at Power House. Note: Initially some margins may be available beyond Kishtwar, however system strengthening would be required depending on the generation addition. - as ISTS 8.6 MASTER PLAN FOR EVACUATION OF POWER FROM HYDRO ELECTRIC PROJECTS IN RABI AND BEAS BASINS 8.6.1 Rabi Basin The list of identified hydro projects in this basin is given below: Sl. No. Name of the Project Installed Capacity, MW 1 Chamera – I 540 2 Chamera – II 300 3 Chamera – III 231 4 Budhil 70 5 Kuther 260 6 Bijoli holi 200 7 Bara Bengal 200 8 Burmur 45 9 Hudsar 60 10 Kugti 45 Total 1951¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 981 The transmission plan is depicted in following figure (Fig – 8.05): Master Plan of Evacuation System for Projects in Rabi Basin LEGEND Existing Proposed 400 kV 220 kV ( 2x0.5 COND.) 220 kV ( HIGH CAPCITY COND. WITH AMPACITY SAME AS TWIN MOOSE) TO KISHENPUR 220 kV ( 0.4 COND.) 400 kV S/S 220 kV S/S Generation step-up to 400 kV Generation step-up to 220 kV KUGTI 45MW BHARMOUR CHAMERA-I KARIAN 220 kV 45 MW HADSAR 540 MW S/S (HPPTCL) 60 MW CHAMERA-III 231 MW BUDHIL BARA CHAMBA 70 MW BHANGAL 125MW 200MW CHAMERA-II 300 MW CHAMERA (4 L0 AP 0 H. S k AV L) K 2U 6T 0E MHR W B 2A 0J 0O ML WI HOLI P.S 400/220 kV TO JULLUNDER Major projects existing in Rabi Basin are Chamera-I (540MW) and Chamera-II (300MW). For evacuation of power 400 kV D/C line from Chamera-I to Jullundhar and 400kV S/C from Chamera-I to Kishenpur LILOed to Chamera-II are existing. Chamera-III (231MW) and Budhil (70MW) are under construction and Kuther(260 MW), Bijoli holi (200 MW),Bara Bengal (200 MW), Burmur (45 MW), Hudsar (60 MW) and Kugti (45 MW) are planned. For evacuation of power from the projects upstream of Chamera-II, a 400/220kV pooling station is planned near Chamera-II which is required matching with Budhil HEP with would be the next project in the valley. This pooling station would be connected to Chamera-II through a 400kV S/C line and to Jullundhar through 400kV D/C line. The line to Jullundhar would be needed with the next generation project which is Chamera-III. A 220kV pooling station at a suitable location upstream of Chamera III is also proposed where power is proposed to be pooled and transmitted to Chamera-II 400/220kV pooling station through three numbers of 220kV D/C lines with 1xMoose conductors. These would be optimum solution for phased development. However, if there are physical constraints in constructing three of 220 kV D/C lines through the valley, it may be required to built two nos. of 220 D.C lines with 2x Moose conductors 8.6.2 Beas Basin The list of identified hydro projects in this basin is given below: Sl. No. Name of the Project Installed Capacity, MW 1 Malana – I 87 2 Larji 126 3 Allain Duhangan 192 4 Malana – II 100 5 Koldam 800 6 Parbati – II 800 7 Parbati - III 501 8 Sainj 100 Total 2706982 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] The transmission plan is depicted in following figure (Fig – 8.06) : Master Plan of Evacuation System for Projects in Beas Basin FROM DUGLI 220kV and HVDC P S (about 1500 MW) FROM CHENAB BASIN FROM TANDI 220kV P S (about 1200 MW) MALANA-I 87 MW ALLAIN DUHANGAN MALANA-II 192 MW 100 MW PARBATI II 800 MW SAINJ HEP 100 MW CHHAUR BAJORA S/S PARBATI III 501 MW HAMIR PUR PARBATI POOLING TO AMRITSAR LARJI 126 MW KOLDAM HEP 800 MW FROM NATHPA JHAKRI TO LUDHIANA/MOGA LEGEND Existing Proposed 400 kV QUAD COND. TO MANDI/GAGAL/ 400 kV TRIPLE COND. KUNIHAR/HAMIR PUR 400 kV TWIN COND. HVDC bi-pole + 400 kV TO LUDHIANA 1500 MW with 50% over-load (with Cables where necessary) 220 kV ( 4x0.5 COND.) (with Cables where necessary) 220 kV ( 0.4 COND.) NALAGARH 132 kV ( 0.3 COND.) 400 kV S/S Total Power about 2700 MW + 220 kV S/S 132 kV S/S 1500-2000 MW from Chandrabhaga Basin Generation step-up to 400 kV TO PATIALA/KAITHAL/ TO NR GRID Generation step-up to 220 kV HISAR NEW FUTURE S/S Generation step-up to 132 kV The existing major projects in Beas basin are Malana-I (87MW) and Larji (126 MW). Power from both these projects is being evacuated through 132 kV HPSEB system. The other major projects in Beas/Parbati basin are Allain Duhangan (192 MW), Malana-II(100MW), Koldam (800MW) Parbati-II (800¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 983 MW), Parbati III (501 MW) and Sainj (100 MW). Evacuation from Koldam, Parbati-II and Parbati-III is planned through 400kV system. The transmission lines are: o Koldam-Nalagarh 400kV D/C Quad conductor line o Parbati-II-Koldam 400kV 2xS/C Quad conductor line o Koldam-Ludhiana 400kV D/C Triple conductor With Parbati-III, a pooling station at Panarsa is proposed and Panarsa-Amritsar 400kV D/C twin Moose line has been planned. The Panarsa 400/220kV pooling station would required in the time frame of Allain Duhangan and Malana- II. However, as the time schedule did not match, a direct 220kV D/C line from Allain Duhangan to Nalagarh has been taken-up for construction by ADHPL. This line with 1xZebra conductor has a capacity of 400 MW through which Malana-II power can also be evacuated. Power from Sainj is proposed to be evacuated through 400kV via Parbati-III. For this, either Sainj may adopt direct step-up to 400kV or have its own 400/132kV substation. The 400/220kV pooling station at Panarsa would still be needed to pool the power to be received from Tandi 220kV pooling station proposed in Chenab basin. As the line from Tandi would be at high altitude, and there may also be need of cables in some portion, 220kV line would be a better option rather that 400kV. The 220kV lines would have to be with higher conductor specification say 220kV D/C line with quad Moose conductors. 8.7 MASTER PLAN FOR EVACUATION OF POWER FROM HYDRO PROJECTS IN ARUNACHAL PRADESH 8.7.1 Basin-wise generation capacity in Arunachal Pradesh In Arunachal Pradesh about 37,600 MW of hydro potential has been identified to be developed in coming years. Out of this, about 2700 MW addition is expected by end 12th Plan and about 35000 MW during 13th Plan period and beyond. These generation projects may be built through private / Government sector. The basin wise identified capacity is given below: Sl. No. Name of Basin Installed Capacity (MW) 1 Twang 2773 2 Kameng 3892 3 Subansiri 8865 4 Siang 6939 5 Lohit 6632 6 Dibang 8508 8.7.2 Transmission system associated with ongoing projects i.e. Lower Subansiri HEP (2000 MW) and Kameng HEP (600 MW) Transmission system for evacuation of power from Lower Subansiri HEP and Kameng HEP in Arunachal Pradesh and hydro electric projects in Bhutan namely Punatsanchu-I (1200 MW), Punatsanchu-II (990 MW) and Mangdechu (720 MW) was evolved in a comprehensive manner. The power from these projects would be evacuated to Northern and Western regions over + 800 kV, 6000 MW HVDC Bipole line from Biswanath Chariyalli to Agra. The implementation of HVDC Bipole was deferred because of delay in implementation of Lower Subansiri HEP. Now the construction of 1971 km HVDC line is in progress and construction of converter terminals at Biswanath Chariyali (3000 MW), Alipurduar (3000 MW) and Agra (6000 MW) has also been awarded. The transmission system is being implemented by POWERGRID. The estimated cost of the scheme is Rs. 11,130 crores. The scheme is expected to be commissioned matching with the commissioning of the hydro projects. The details of the transmission system are given below. a. North East-Northern / Western Interconnector –I • Biswanath Chariyalli-Agra + 800 kV, 6000 MW HVDC bipole line • Balipara- Biswanath Chariyalli 400 kV D/C line • LILO of Ranganadi-Balipara 400 kV D/C line at Biswanath Chariyalli • Biswanath Chariyalli- Biswanath Chariyalli (AEGCL) 132 kV D/C line • 2x200 MVA 400/132 kV S/S at Biswanath Chariyalli984 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] • HVDC 3000 MW rectifier module at Biswanath Chariyalli and 3000 MW inverter module at Agra • 1x315 MVA 400/220 kV S/S at Agra (aug.) b. Transmission System for immediate evacuation of power from Kameng HEP • Kameng-Balipara 400 kV D/C line • Balipara-Bongaigaon 400 kV D/C line (Quad) with 30 % fixed series compensation • 2nd 315 MVA 400/220 kV ICT at Misa c. Transmission System for immediate evacuation of power from Lower Subansiri HEP • Lower Subansiri-Biswanath Chariyalli 400 kV 2xD/C with twin lapwing conductor 8.7.3 Development of Master Plan CEA has developed river basin wise master plan for evacuating the power of various proposed hydro projects in the state of Arunachal Pradesh. The master plan would serves as a basis for firming up the transmission system for evacuation of power from the hydro projects in Arunachal Pradesh. Broadly the planned transmission system consists of three parts. i. Immediate evacuation system for transfer of power from individual generating station to nearest basin wise pooling station/s. ii. Common transmission system form basin Pooling station/s to bigger pooling station. iii. Bigger pooling station to Load centers in other region through HVDC / EHVAC lines. The first two parts consist of 220kV or 400kV EHVAC transmission systems for generation projects identified in a river basin. The third part i.e. the system from bigger pooling station (which would pool projects totalling to 5000 – 7000 MW capacity) to load centers in other regions, is still under planning stage. These would consist of high capacity long distance transmission systems primarily using latest HVDC technology. As the majority of the generation projects i.e. 34000 MW out of 37000 MW are likely to come during 2017-2030 time period, the system for transmitting this power over long distances and optimizing RoW shall need to be planned using latest available technology at that time. A combined transmission master plan for various river basins in Arunachal Pradesh is depicted in figure (Fig – 8.07). The generation developers who intend to use inter-state transmission system for evacuation of power from their projects have to approach Central Transmission Utility (CTU) for Grid Connectivity and seek Long Term Access (LTA) as per the CERC regulation. After the grant of LTA to the hydro project developer, the developer needs to sign Long Term Access Agreement (LTAA) and submit requisite bank guarantee to the CTU and thereafter, the identified transmission system is taken up for implementation. Thus, the various transmission systems identified in the master plan would be implemented as per the need and schedule of the associated generation project.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 985 Fig – 8.07 8.7.4 Transmission System for Projects in Lohit Basin: A: Hydro projects who have applied for connectivity / LTA to CTU Following hydro projects developers have applied to the CTU for Grid connectivity / Long Term Access in Arunachal Pradesh in Lohit Basin: Sl. Name of Project Name of Installed Capacity LTA / Connectivity (MW) No. Developer (MW) 1 Lower Demwe Athena Demwe 5x342+1x40=1750 1750 Power Ltd. Total - A 1750 1750 B: Additional Hydro projects Following additional hydro projects has been considered while evolving transmission system from Lohit Basin: Sl. No. Name of Project Name of Developer Installed Capacity (MW) 1. Demwe Upper Athena Energy Venture (Lohit Urja) 1080 2. Kalai-II Kalai Power Pvt. Ltd. (Reliance 1200 Power Ltd.) 3. Houtang-II Mountain Fall India Pvt. 1250 4. Kalai-I Mountain Fall India Pvt. 1352 Total - B 4882 Total (A+B) 6632986 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] C: Transmission system: The power from the hydro projects would be pooled at Namsai Pooling Point from where; it would be evacuated over + 800 kV 7000 MW HVDC bipole line to other region of the country. For improving the reliability of evacuation of power Lohit basin, Namsai would be interconnected with Rupai Pooling Point over 400 kV D/C HTLS AC line. Power from hydro projects in Myanmar is proposed to be pooled at Rupai Pooling point from where another + 800 kV HVDC (7000 MW) bipole line is proposed to other region of country. 8.7.5 Transmission System for Projects in Dibang Basin: A: Hydro projects who have applied for connectivity / LTA to CTU No hydro project developer has applied to the CTU for Grid connectivity / Long Term Access in Arunachal Pradesh in Dibang Basin as on date. B: Additional Hydro projects Following additional hydro projects has been considered while evolving transmission system from Dibang Basin: Sl. No. Name of Project Name of Developer Installed Capacity (MW) 1. Dibang NHPC 3000 2. Emini Emini Hydro Power Pvt. Ltd. 500 (Reliance Energy Ltd.) 3. Mihumdon Mihumdon Hydro Power Pvt. Ltd. 400 (Reliance Energy Ltd.) 4. Sissiri Soma Sissiri Hydro Power Pvt. Ltd. 1352 (Soma Enterprise Ltd.) 5. Emra-II Athena Energy Venture 216 6. Amulin Amulin Hydro Power Pvt. Ltd. 420 (Reliance Energy Ltd.) 7. Emra-I Athena Energy Venture 275 8. Etalin Jindal Power Ltd. 3097 9. Attunli Jindal Power Ltd. 500 Total B 8508 Total (A+B) 8508 C: Transmission system: The power from the hydro projects except Dibang and Etalin would be pooled at a sub pooling point at Anini. The power from Dibang and Etalin hydro project and that from Anini sub pooling point would be pooled at Dambuk, a bigger pooling point, from where it would be evacuated over + 800 kV 7000 MW HVDC bipole line to other region of the country. Anine pooling point would be connected to Dambuk pooling point over 400 kV D/C line with HTLS conductor. For evacuating remaining power from this basin, the Dambuk pooling point would be interconnected with Rupai pooling point over 400 kV 2xD/C HTLS lines. 8.7.6 Transmission System for Projects in Siang Basin: A: Hydro projects who have applied for connectivity / LTA to CTU Following hydro projects developers have applied to the CTU for Grid connectivity / Long Term Access in Arunachal Pradesh in Siang Basin: S. No. Name of Project Name of Installed Capacity LTA / Connectivity (MW) Developer (MW) 1. Lower Siang Jayprakash Power Ph-I : 5x300=1500 2700 Ventures Ltd Ph-II :4x300=1200 (JPVL) Total = 2700 2. Siyom (Siang Siyom Hydro 6x166.6=1000 1000 Midle) Power Pvt. Ltd.¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 987 S. No. Name of Project Name of Installed Capacity LTA / Connectivity (MW) Developer (MW) (Reliance Energy Ltd.) 3. Tato-II Tato-II Hydro 4x175=700 700 Power Private Ltd. (Reliance Energy Ltd.) 4. Naying D S Construction 4x250=1000 1000 Ltd 5. Tagurshit L&T Power Ltd. 3x28=84 84 6. Pauk Pauk Hydro Power 3x48.3=145 145 Project (Velcan Energy Ltd.) 7. Heo Heo Hydro Power 3x80=240 240 Project 8. Tato-I Siyota Hydro 3x62=186 186 Power Project Total A 6055 6055 B: Additional Hydro projects Following additional hydro projects has been considered while evolving transmission system from Siang Basin: S. No. Name of Project Name of Developer Installed Capacity (MW) 1. Pemashelpu Rajratna Metal Industries 90 2. Hirong Jaiprakash Associates Ltd. 500 3. Kangtangshiri Rajratna Metal Industries 80 4. Ropum Rajratna Metal Industries 80 5. Simang-I Adishankar Power Pvt. Ltd. 67 6. Simang-II Adishankar Power Pvt. Ltd. 67 Total B 884 Total (A+B) 6939 C: Transmission system: The power from some hydro projects in Siang Basin would be pooled at a sub pooling point Tato. Power pooled at Tato would be pooled at another pooling point Kamki, where power from near by hydro projects would also be pooled. The power from Kamki pooling point would be brought to bigger pooling point at Shilapathar through high capacity 400 kV AC lines. The power from Lower Siang project would be directly pooled at Shilapathar. From Shilapathar the power would be evacuated over + 800 kV 7000 MW HVDC bipole line to other region of the country. In order to provide redundancy in the transmission system, the Shilapathar would be interconnected with Biswanath Chariyali and Rupai over high capacity 400 kV D/C HTLS lines. 8.7.7 Transmission System for Projects in Subansiri Basin: A: Existing Project: S. No. Name of Project Name of Developer Installed Capacity (MW) 1. Ranganadi NEEPCO 405 Total A 405 The power is evacuated over 400 kV D/C line to Balipara sub-station. B: Ongoing Project: S. No. Name of Project Name of Developer Installed Capacity (MW) 1. Subansiri Lower NHPC 2000 Total B 2000988 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] The associated transmission system is given at 8.7.2 above. C: Hydro projects who have applied for connectivity / LTA to CTU No hydro project developer has applied to the CTU for Grid connectivity / Long Term Access in Arunachal Pradesh in Subansiri Basin as on date. D: Additional Hydro projects Following additional hydro projects has been considered while evolving transmission system from Siang Basin: S. No. Name of Project Name of Developer Installed Capacity (MW) 1. Subansiri Middle Jindal Power Ltd. 1600 2. Subansiri Upper KSK Energy Venture Ltd. 1800 3. Naba Abir Infrastructure Pvt. Ltd. 1000 4. Nalo Coastal Infrastructure Pvt. Ltd. 360 5. Oju-II Navayuga Energy Co. Ltd. 1000 6. Oju-I Navayuga Energy Co. Ltd. 700 Total D 6460 Total (A+B+C+D) 8865 E: Transmission system: The power from hydro projects mentioned in Subansiri Basin except Subansiri Middle would be pooled at Daporijo Pooling Point and that from Subansiri Middle would be pooled at Subansiri Lower. The power from Daporijo pooling point would be brought to New Itanagar pooling point over 400 kV 2xD/C HTLS lines, from where it would be evacuated over + 800 kV 7000 MW HVDC bipole line to other region of the country. Further, one D/C of 400 kV Subansiri Lower – Biswanath Chariyalli 2xD/C line would also be Looped in and looped out at New Itanagar. 8.7.8 Transmission System for Projects in Kameng Basin: A: Ongoing Hydro project: S. No. Name of Project Name of Developer Installed Capacity (MW) 1. Kameng NEEPCO 600 Total A 600 The associated transmission system is given at 8.7.2 above. B: Hydro projects who have applied for connectivity / LTA to CTU Following hydro projects developers have applied to the CTU for Grid connectivity / Long Term Access in Arunachal Pradesh in Siang Basin: S. No. Name of Project Name of Installed Capacity LTA / Connectivity (MW) Developer (MW) 1. Dibbin KSK Dibbin Hydro 2x60=120 120 Power Pvt Ltd 2. i) Gongri Patel Hydro Pvt 3x48=144 273 ii) Saskang Rong Ltd 2x22.5=45 iii) Meyong 2x19=38 iv) Diggin 2x23=46 3. Khuitam Adishankar 3x22 = 66 66 Khuitam Power Pvt. Ltd. 4. Nafra SEW Power 2x60 = 120 132 Corporation Ltd 5. i) Pachuk-I Energy 84 391 ii) Pachuk-II Development 60 iii) Pachuk-II (L) Company Ltd 45 iv) Margingla (EDCL) 60¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 989 v) Margingla (L) 48 vi) Pakke-I 40 vii) Pakke-II 15 viii) Pakke-III 24 ix) Pakke-IV 15 6. Talong (Londa) GMR Londa Hydro 3x75 = 225 225 Power Pvt Ltd. Total B 1195 1207 C: Additional Hydro projects Following additional hydro projects has been considered while evolving transmission system from Siang Basin: S. No. Name of Project Name of Developer Installed Capacity (MW) 1. Rebby Coastal Projects Ltd. 31 2. Para Coastal Projects Ltd. 55 3. Badao Coastal Projects Ltd. 70 4. Lochung Coastal Projects Ltd. 41 5. Phanchung (Pachi) Indiabull Real Estate Ltd. 56 6. Pichang Indiabull Real Estate Ltd. 12 7. Tarang Warang Indiabull Real Estate Ltd. 36 8. Papu Indiabull Real Estate Ltd. 90 9. Sepla Indiabull Real Estate Ltd. 21 10. Utung KSK Energy Venture Pvt. Ltd. 100 11. Kameng Dam KSK Energy Venture Pvt. Ltd. 480 12. Dimijin KSK Energy Venture Pvt. Ltd. 20 13. Dinchang KSK Energy Venture Pvt. Ltd. 360 14. Jameri KSK Energy Venture Pvt. Ltd. 90 15. Kameng II (Bhareli) Mountain fall India Pvt. Ltd. 600 16. Papu Valley Vensar Construction Co. Pvt. Ltd. 35 Total C 2097 Total (A+B+C) 3892 D: Transmission system: The power from nine hydro projects of Energy Development Company Ltd. (EDCL) in Kameng basin would be pooled at EDCL sub pooling point. Power from the hydro projects in Western part of Kameng basin would be pooled at Dinchnag Pooling Point. Power from Northern part of Kameng basin and that from EDCL sub pooling point will be pooled at Talong Pooling point. Power from Talong pooling point and that from hydro projects in South-Eastern part of Kameng basin would be pooled at South Kameng pooling point. Further power from Dinchang pooling point would be brought to Rangia / Rowta pooling point over 400 kV quad D/C line, from where it would be evacuated over + 800 kV 7000 MW HVDC bipole line to other region of the country. The power from South Kameng pooling point would be brought to Biswanath Chariyali pooling point over 400 kV D/C HTLS line. The capacity of converter terminal at Biswanath Chariyali would be augmented to 6000 MW and the LILO of HVDC line to Agra would be disconnected at Alipurduar terminal. 8.7.9 Transmission System for Projects in Twang Basin: A: Hydro projects who have applied for connectivity / LTA to CTU Following hydro projects developers have applied to the CTU for Grid connectivity / Long Term Access in Arunachal Pradesh in Twang Basin:990 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] S. No. Name of Project Name of Developer Installed LTA / Connectivity Capacity (MW) (MW) 1. Nyamjang Chu Bhilwara Energy Ltd. 6x130 = 780 780 2. i) Tashu-I Energy Development 3x8=24 164 ii) Tashu-I (L) Company Ltd. 3x16.6=50 iii) Tashu-II (EDCL) 3x30=90 3. Twang-I NHPC Ltd. 3x200=600 660 (with over load) 4. Twang-II NHPC Ltd. 4x200=800 880 (with over load) Total A 2344 2484 B: Additional Hydro projects Following additional hydro projects has been considered while evolving transmission system from Twang Basin: S. No. Name of Project Name of Developer Installed Capacity (MW) 1. Mago Chhu Sew Energy Limited 96 2. Nykcharongchu Sew Energy Limited 96 3. Rho Sew Energy Limited 141 4. New Melling Sew Energy Limited 96 Total B 429 Total (A+B) 2773 C: Transmission system: The power from hydro projects in Twang Basin would be pooled at Twang pooling point. Power pooled at Twang would be pooled at Bigger pooling point Rangia / Rowta through 400 kV D/C Quad HTLS line. From Rangia / Rowta the power would be evacuated over + 800 kV 7000 MW HVDC bipole line to other region of the country. It is also proposed to LILO 400 kV Balipara- Bongaigaon lines at Rangia / Rowta. 8.8 Future Development of Transmission System in North Eastern Region Large number of hydro generating station, are anticipated in North Eastern Region, during 13th plan period. These would be a major source of power to the North Eastern Regional constituents. In order that NER constituents would be able to draw power from these projects, adequate system strengthening would be required in NER constituent states. Therefore, it is important that transmission development in the NER states is also taken up hand in hand in a phased manned with the development of the hydro projects so that the transmission network in the region is also strengthened. Accordingly, a tentative system strengthening transmission plan for 13th plan in NER is given below: (i) Rangia / Rowta Pooling Station – Azara 400kV D/c line (high capacity) (ii) Azara – Byrnihat 400kV D/c line (high capacity) (iii) Byrnihat – Silchar 400kV D/c line (high capacity) (iv) Silchar – Surajmaninagar 400kV D/c line (high capacity) (v) Surajmaninagar – Melriat 400kV D/c line (high capacity) (vi) Melriat – Imphal 400kV D/c line (high capacity) (vii) Imphal – Kohima 400kV D/c line (high capacity) (viii) Kohima – Mariani 400kV D/c line (high capacity) (ix) Mariani–Silapathar Pooling Station 400 kV D/c line (high capacity) 8.9 PERSPECTIVE TRANSMISSION PLAN FOR EVACUATION OF POWER FROM POJECTS IN BHUTAN 8.9.1 Introduction Bhutan has total installed generating capacity of 1480 MW comprising of Tala (1020MW), Chukha (336MW), Kurichhu (60MW) and Bosochhu-I (24MW) & II (40MW) HEPs. Bulk of power generated at the HEPs is exported to India after meeting the internal demand of Bhutan. The associated¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 991 evacuation system and cross-border transmission lines for transfer of power has been developed at 400kV and 132kV levels and is operated in synchronism with the Indian Grid. Royal Government of Bhutan (RGoB) has embarked on to harness its huge hydro potential and identified about 75 nos. new HEPs by 2030 at various river basins. About 26534 MW hydro potential would be harnessed by 2030 and out of this, 10334 MW hydro power developments from 14 nos. HEPs have been envisaged to be implemented during 2020. Among these, Punatsangchhu I, Punatsangchhu II, and Mangdechhu are under various stages of development and targeted to be commissioned during 2015-17. The remaining hydro projects are Sankosh, Chamkharchhu, Nikachhu, Kholongchhu, Kuri Gongri, Amochhu RS, Bunakha, Wangchhu, Bindu Khola and Dagachhu. As per the load forecast made by Bhutan, estimated load demand by 2020 is 1500 MW & it increases to 2500 MW by 2030. Thus, most of the future generation in Bhutan would also be exported to India. Considering the above scenario, a grid master plan for Bhutan was evolved for developing transmission corridors with AC & HVDC lines, nodal pooling points, HVDC converter stations in Bhutan and corresponding transmission addition requirements in India for 2020 and 2030 scenarios. 8.9.2 Transmission system under Implementation Stage For power evacuation from Punatsangchhu-I HEP, the two numbers 400 kV D/C Twin Moose lines from Punatsangchhu-I have been planned to be constructed up Lhamoi Zingkha/Sankosh (Indian border) with one D/C via Punatsangchhu-II HEP. From Sankosh, one 400 kV high capacity D/C line (quad moose conductor) upto the Indian pooling point at Alipurduar would be constructed and would be initially inter-connected with 2 nos. of D/C twin moose line of Punatsangchhu -I HEP, till the time 400 kV switchyard of Lhamoi Zingkha/Sankosh HEP gets established. At Alipurduar, an HVDC station with ± 800 kV, 3000 MW converter module and 2x315 MVA, 400/220 kV EHVAC substation is planned to be constructed for import of power from Punatsangchhu-I & II. The ± 800 kV, 6000 MW Bishwanath Chariyali (NER)-Agra (NR) HVDC bi-pole line with 3000 MW converter module each at Bishwanath Chariyali (Rectifier end) and Agra (inverter end), which is being developed as part of NER-NR/WR inter-connector project for evacuation from HEPs in NER, would be LILOed at Alipurduar. An additional 3000 MW converter module at Agra making total terminal capacity of 6000 MW is planned to facilitate import of power from Bhutan. Accordingly, the transmission system reinforcement in India at the initial stage would be as hereunder: (i) New 2x315 MVA, 400/220 kV AC & HVDC substation with ± 800 kV, 3000 MW converter module at Alipurduar. (ii) Extension of 800 kV HVDC station with 3000 MW inverter module at Agra. (iii) LILO of 800 kV Bishwanath Chariyali – Agra HVDC Bi-pole line at Alipurduar for parallel operation of the HVDC converter station at Alipurduar. (iv) LILO of Bongaigaon – Siliguri 400 kV D/C Quad line at Alipurduar. (v) LILO of Tala Siliguri 400 kV 1xD/C line at Alipurduar. (vi) LILO of Birpara-Salakati 220 kV D/C line at Alipurduar. (vii) Sankosh/Lhamoi Zingkha – Alipurduar 400 kV 1xD/C Quad moose line (Indian portion). 8.9.3 Transmission system for import of surplus power from Bhutan, by 2020. Mangdechhu, Nikachhu, Chamkarchhu-I, Kuri-Gongri and Kholongchhu HEPs in eastern part of Bhutan are envisaged to be developed during 2017-2020. Power generations from these HEPs are proposed to be pooled at Jigmeling (via Goling) and thereon to Alipurduar (WB) overa 400 kV D/C quad moose conductor line, after meeting the internal load demand of Bhutan. Exportable surplus power to be available at Jigmeling for export to India is in the order of 1500-1900 MW under normal peak operating condition. Further from Sankosh/Lhamoi Zingkha, about 4200-4400 MW is being injected to Alipurduar over 400 kV 2xD/C quad moose lines. In order to transfer such a huge quantum of power from Alipurduar to NR/WR (deficit regions) of India, it is planned to develop a new and independent 800 kV, 6000 MW HVDC bi-pole from Alipurduar to a suitable de-pooling point in NR or WR of India (based upon the regional load generation scenario) with augmentation of converter terminal capacity from 3000 MW to 6000 MW at Alipurduar, and a 6000 MW new converter station (inverter terminal) at the de-pooling point. Subsequently, LILO of 800 kV, 6000992 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] MW Bishwanath Chariyali (NER) – Agra (NR) HVDC line at Alipurduar would be removed restoring the direct HVDC bi-pole line from Bishwanath Chariyali (NER) to Agra (NR). The power injected at Yangbari PS from HEPs in eastern Bhutan is to be polled at 400 kV EHVAC & HVDC station at Rangia/Rowta in Assam over 400 kV Yangbari – Rangia/Rowta – NR/WR HVDC bi-pole line with converter capacity 6000 MW (for Kuri-Gongri 1800 MW) or 7000 MW (for Kuri- Gongri 3400 MW) is contemplated for evacuation of Bhutan power and for part evacuation of Arunachal HEPs at Tawang and Kameng basins in NER. Thus, the transmission grid reinforcements shall cover the following: (i) Construction of 400 kV Jigmeling-Alipurduar Quad moose D/C line (Indian portion). (ii) Construction of 400 kV Yangbari-Rangia/Rowta 2xD/C Quad moose conductor lines (Indian portion). (iii) Establishment of a new + 800 kV, 6000 MW HVDC bi-pole line from Alipurduar to a suitable de-pooling point in NR./WR and redoing of 800 kV Bishwanath Chariyali (NER) – Agra (NR) HVDC line by removing its LILO at Alipurduar. (iv) + 800 kV, Rangia/Rowta-NR/WR HVDC bi-pole line with converter capacity 6000 MW (for Kuri-Gongri 1800 MW) or 7000 MW (for Kuri-Gongri 3400 MW) each Rangia/Rowta and NR/WR. The transmission system up to 2020 is depicted in the figure(Fig – 8.08). 8.9.4 Perspective Transmission Plan for import of power from Bhutan, by 2030 The major HVDC and AC cross-border corridor requirement in future are as follows: I. Prospective HVDC Transmission Corridors for Indian grid, by 2030 i. ± 800 kV, 6500MW Rangia/Rowta - WR/NR HVDC 2nd bipole ii. ± 800 kV, 6000MW Sankosh/Lhamoi Zingkha – NR/WR HVDC bipole iii. ± 800 kV, 6500 MW Yangbari - WR/NR HVDC bipole II. Prospective Cross border AC Transmission Corridors, by 2030 iv. 400kV Amochhu-I/II–Alipurduar D/C line v. Manas-RS I/II–Rangia/Rowta 2xD/C Quad moose conductor lines vi. Nyera Amari II–Rangia/Rowta 2xD/C Quad moose conductor lines¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 993 The transmission system upto 2030 is depicted in the figure (8.09). Fig – 8.8 (2020 scenario)994 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] Fig – 8.8 (2020 scenario)¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 995 8.10 PERSPECTIVE TRANSMISSION PLAN FOR EVACUATION OF POWER FROM GENERATION PROJECTS IN NEPAL 8.10.1 Existing Cross Border interconnections Power exchange between NEA and utilities on the Indian side namely BSEB, UPPCL and UPCL has since been taking place on the principle of catering to the power needs of isolated local areas of both of the sides of the border. About 13 cross border interconnections facilities including 11kV, 33kV and 132 kV transmission lines are in operation for bilateral power exchange. The Indian utilities supply power to Nepal on the basis of the tariff principle determined by the Power Exchange Committee. India also supplies about 70 MU free power from Tanakpur HEP (120 MW) to Nepal under the Mahakali Treaty through the 132kV Tanakpur-Mahendranagar S/C line. Further, system strengthening measures for additional supply for 75MW on commercial route to Nepal under short term and further 132MW under medium term are under various stages of implementation. 8.10.2 Establishment of the cross border 400 kV Muzaffarpur (India)- Dhalkebar (Nepal) The 400kV Muzaffarpur (India) - Dhalkebar D/C line (Indian portion- 87km by CPTC (JV) , Nepal portion- 39km) is being implemented by JV Companies i.e. Cross Border Transmission Company (CPTC) for the Indian portion and Power Transmission Company Limited (PTCN) for the Nepal portion. Power Sale Agreement (PSA) between NEA and PTC has been signed. The Implementation and Transmission Service Agreement (ITSA) has been also signed between NEA and CPTC, and between NEA and PTCN. This line is scheduled to be completed by June 2014. For initial 5-7years, it is estimated that Nepal will have a power deficit to the tune of 200-300 MW and this shortfall is likely to be met by import from Indian Electricity market through the 400kV Muzaffarpur-Dhalkebar D/C line to be initially operated at 220 kV. 8.10.3 Perspective Transmission Plan for import of power from Nepal In the next 7-10 years, hydro power projects in Nepal such as Upper Marsyangdi (600MW), Upper Karnali (900 MW), Arun-III (900MW), Tamakoshi (800 MW) etc., are likely to be materialized. NEA would have huge surplus for export to India after meeting their internal load demand. In order to evacuate and transfer of power to India, additional high power density 400kV AC cross border links in Upper Karnali - Berilly, Upper Marsyangdi – Gorakhpur, Arun-III – Muzaffarpur and Butwal - Gorakhpur corridors are being planned to be developed, matching with the commissioning of the above hydro projects in Nepal. The existing and prospective cross border interconnections with Nepal are shown in following figure:996 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] U.KARNALI (900MW) BAREILLY MARSYANDGI (600MW) TAMAKOSHI 880MW ARUN-III (900MW) DHALKEBAR (JANAKPUR) GORAKHPUR (PG) MUZAFFARP PU GR T M 8.11 PERSPECTIVE TRANSMISSION PLAN FOR EVACUATION OF POWER FROM TAMANTHI HEP AND SHWEZAYE HEP IN MYANMAR 8.11.1 Introduction Two hydro electric projects i.e. Tamanthi HEP(1200 MW) and Shwezaye HEP(880 MW) are being planned in Chindwin River basin in Myanmar. To promote bi-lateral cooperation between India and Myanmar, a Memorandum of Understanding (MoU) was signed between the Department of Hydro Power Implementation (DHPI), Ministry of Electric Power, Government of Union of Myanmar (GoUM) and NHPC Ltd. for development of these projects. Tentative schedule for these projects is 2018-2020. It is expected that power from these projects would be absorbed in India, and as such, a perspective plan for evacuation of power from these projects has been prepared. 8.11.2 Transmission system for evacuation of power from Tamanthi and Shwezaye HEP in Myanmar In view of geographical proximity of Myanmar with the North Eastern region of India, it would be economical to first bring the power from generation projects in Myanmar to NER for onward transfer to other parts of India. The transmission system for evacuation of power from Tamanthi and Shwezaye projects has been planned considering two scenarios. In the main scenario, new generation projects in NER would be combined with the generation projects of Myanmar and a high capacity 7000MW HVDC transmission corridor has been envisaged. In the second scenario, no major future generation projects has been considered in NER which could be combined with the generation projects in Myanmar and the power has been planned to transfer utilizing the AC transmission system. The transmission system would be firmed up after finalization of various details of the generation projects like time-frame of commissioning, quantum of power to be injected into the Indian grid and its beneficiaries etc. Accordingly, following alternatives have been considered for evacuation and transfer of power from Myanmar generation projects:¹Hkkx IIIµ[k.M 4º Hkkjr dk jkti=k % vlk/kj.k 997 8.11.3 Main Alternative : With a new +800 kV, 7000MW HVDC bipolar line from NER to NR/WR) A. Transmission System up to New pooling point (Shilapathar) in NER 1. Shwezaye - Tamanthi 400 kV D/c line 2. Tamanthi – Namsai Pooling Point (NER) 400kV 2xD/c line (twin lapwing) 3. TCSC (Thyristor Controlled Series Compensator) (Fixed: 40%, Variable - 5-15%) on Shwezaye - Tamanthi line at Tamanthi end B. Common Transmission System (+/- 800kV, 7000MW HVDC bipolar from Namsai Pooling Point (NER) to NR/WR) 1. Namsai Pooling Point (NER) - NR / WR Pooling +800 kV, 7000MW, HVDC Bipolar line 2. +800 kV, 6000MW HVDC terminals at Namsai Pooling Point (NER) and NR / WR Pooling point 8.11.4 Alternative-2: Utilising the AC transmission system in NER A. Transmission System up to Biswanath Chariyali pooling point in NER 1. Shwezaye - Tamanthi 400 kV D/c line 2. Tamanthi – Biswanath Chariyali (NER) 400kV 2xD/c line (twin lapwing) 3. TCSC (Thyristor Controlled Series Compensator) (Fixed: 40%, Variable - 5-15%) on Shwezaye - Tamanthi line at Tamanthi end B. Common Transmission System 1. Re-conductoring of Bongaigaon - Silliguri 400 kV D/c line from twin to high capacity conductor 2. Patna - Varanasi 400 kV D/c line (quad conductor) **********998 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4] CHAPTER - 9 COMMENTS ON NEP-TRANSMISSION As per the Electricity Act, 2003, CEA is to prepare the National Electricity Plan (NEP) once in five years. The Act stipulates that CEA, while preparing the NEP, shall publish the draft of the same and invite suggestions and objections from licensees, generating companies, and the public. Thereafter, the Plan is to be notified after obtaining the approval of the Central Government. The draft NEP, which covers a review of the 11th Plan, 12th Plan in detail, and perspective Plan was prepared by CEA in two volumes (Vol.I on Generation and Vol.II on Transmission) and was made available on the CEA website on 29.03.2012. Views/ suggestions/ comments on the draft NEP were invited till 30th June, 2012. The following companies/ individuals have sent their views/ suggestions/ comments on National Electricity Plan (Vol. II), Transmission. Sl. No. Name of the Stakeholder 1. M/s Power System Operation Corporation Limited 2. M/s NHPC Limited 3. M/s Bhakra Beas Management Board 4. M/s U.P. Power Transmission Corporation Limited 5. M/s Odisha Power Transmission Corporation Limited 6. M/s Chhatisgarh State Power Transmission Co. Limited 7. M/s PTC India Limited 8. M/s Association of Power Producers 9. M/s Power Research & Development Consultants Private Limited 10. M/s India Wind Energy Association 11. M/s India Wind Power Association 12. M/s Reliance Power Transmission Limited 13. M/s LACHUNG Hydro Power Limited 14. M/s TEESTA Hydro Power Private Limited 15. M/s Athena Chhattisgarh Power Limited 16. M/s CHUNGTHANG Hydro Power Limited 17. M/s MB Power (Chhattisgarh) Limited 18. Mr. A. Raja Rao, Retd. Ex. Director, BHEL, Bangalore 19. Mr. J. Balasubrahmanyam, Power Sector Professional 20. Mr. Jayant Ingolikar, Nagpur The present National Electricity Plan (Vol. II), Transmission has been finalized by suitably considering the view/ suggestions/ comments received as above. ********** Printed by the Manager, Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054

Continue your research