Construction of 02 Lane Road Over Bridge in place of LC No 538 on 1418/08 10 km. of Agra Palwal Section in District Mathura and Construction of 02 lane Road Over Bridge in place of LC No 550 on 1444/17 19 km. of Agra Palwal Section in District Mathura
**Executive Summary**
This document comprises two notifications from the Ministry of Railways (North Central Railway), published in the Gazette of India on October 8, 2025. The notifications declare the intention to acquire land in Mathura district, Uttar Pradesh, for the construction of two lane road over bridges. Interested parties have 30 days from the Gazette publication date to raise objections to the acquisitions.
**Key Points / Main Content**
* **General Provisions:**
* Issued under Section 20A of the Railways Act, 1989, and the Railway (Amendment) Act, 2008.
* Declares the intention to acquire land for public purposes.
* Any order made by the Competent Authority under sub-section (2) of Section 20D of the Railways Act shall be final.
* **Notification 1 (S.O. 4579(E)):**
* Intends to acquire land for construction of a two lane road over bridge in place of LC No. 538 on 1418/08-10 km of Agra-Palwal Section in District Mathura.
* Land Description:
* Location: Agra-Palwal Section, Mathura, Uttar Pradesh
* Land Area: 0.5172 Hectares
* Villages: Akbarpur
* **Notification 2 (S.O. 4580(E)):**
* Intends to acquire land for construction of a two lane road over bridge in place of LC No. 550 on 1444/17-19 km of Agra-Palwal Section in District Mathura.
* Land Description:
* Location: Agra-Palwal Section, Mathura, Uttar Pradesh
* Land Area: 0.5031 Hectares
* Villages: Kotawan
* **Objection Process:**
* Interested parties have 30 days from the publication date to raise objections.
* Objections must be submitted in writing to the Special Land Acquisition Officer, Mathura.
* The Competent Authority (Special Land Acquisition Officer) will provide a hearing and may allow or disallow objections.
* **Land Details:**
* Detailed land plans and other relevant information are available for inspection at the office of the Competent Authority.
**Impact Analysis**
**Stakeholder: Landowners/Interested Parties**
* **Impact:** Potential loss of land due to acquisition for the railway project; opportunity to object to the acquisition.
* **Action Required:** Inspect land details at the Competent Authority's office. Submit written objections to the Special Land Acquisition Officer, Mathura, within 30 days of the publication date if they oppose the land acquisition.
**Stakeholder: Special Land Acquisition Officer, Mathura**
* **Impact:** Responsible for receiving and reviewing objections to the land acquisition.
* **Action Required:** Receive and process objections. Provide hearings to objectors and make orders allowing or disallowing objections.
**Stakeholder: Ministry of Railways (North Central Railway)**
* **Impact:** Facilitation of construction of road over bridges to enhance railway infrastructure.
* **Action Required:** Proceed with land acquisition upon resolution of objections and finalize plans for construction.
**Stakeholder: Residents of Mathura District, Uttar Pradesh**
* **Impact:** Potential disruption during construction, but long-term benefit from improved infrastructure and transportation.
* **Action Required:** No direct action required, but may monitor the project's progress and voice concerns through appropriate channels.
Key Entities Referenced
Railways Act, 1989: The central law cited as the basis for land acquisition.
Agra-Palwal Section: The specific railway section where the construction of road over bridges is planned.
Mathura, Uttar Pradesh: The district and state where the land acquisition is taking place for the bridge construction.
Ministry of Railways: The ministry responsible for the railway project and land acquisition.
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99
सी.जी.-यू.पी.-अ.-13102025-266897
CG-UxxPx-GEID-1H3x1x0x2 025-266897
xxxGIDExxx
असाधारण
EXTRAORDINARY
भाग II—खण् ड 3—उप-खण्ड (ii)
PART II—Section 3—Sub-section (ii)
प्राजधकार स ेप्रकाजित
PUBLISHED BY AUTHORITY
स.ं 4451] नई कदल्ली, बुधवार, अक्त बू र 8, 2025/आजश्व न 16, 1947 27, 1947
No. 4451] NEW DELHI, WEDNESDAY, OCTOBER 8, 2025/ASVINA 16, 1947 A 27, 1947
रेल मत्रं ालय
(उत्तर मध्य रेलव)े
अजधसचू ना
प्रयागराि, 19 जसतम्बर 2025
का.आ. 4579(अ).— केन्द्रीय सरकार, न े रेल अजधजनयम, 1989 (1989 का 24) एव ं रेलव े (संिोधन)
अजधजनयम 2008 (2008 का 11) (जिसे इसम ें इसके पश्चात ् उक्त अजधजनयम कहा गया ह)ै की धारा-20 ‘ए’ के खण्ड-
(1) द्वारा प्रदत्त िजक्तयों का प्रयोग करते हुये, यह समाधान हो िाने के पश्चात् कक लोक प्रयोिन के जलए, वह भूजम,
जिसका संजिप्त जववरण इससे उपाबद्ध अनुसूची में कदया गया है, उत्तर प्रदेि राज्य के मथरु ा जिले में आगरा-पलवल
सक्े िन म ें कक0मी0 1418/08-10 पर समपार सख्ं या 538 के स्ट्थान पर 02 लने रोड ओवर जिि के जनमाणा हते ु
अपेजित ह,ै ऐसी भूजम का अिना करने के आिय की घोषणा करती ह।ै
उक्त भूजम के जहतबद्ध कोई व्यजक्त, रािपत्र म ें इस अजधसूचना के प्रकािन की तारीख से 30 कदन के भीतर, उक्त
अजधजनयम की धारा-20घ की उप-धारा-(1) के अधीन उपयक्तुा प्रयोिन के जलए ऐसी भूजम के अिान और उपयोग के
सम्बन्द्ध में आिेप कर सकेगा।
प्रत्येक ऐसा आिेप, सिम प्राजधकारी अथाता ् जविषे भजू म अध्याजप्त अजधकारी, सयं क्तु सगं ठन, मथरु ा उत्तर
प्रदेि को जलजखत में ककया िायेगा और उसके आधार उपवर्णात करेगा और सिम प्राजधकारी आिेपकता ा को व्यजक्तगत
रूप स े या जवजध व्यवसायी के माध्यम से सनु वाई का अवसर प्रदान करेगा और ऐसे आिेपों की सुनवाई करने तथा ऐसी
िााँच करने के पश्चात् यकद कोई हो, जिसे सिम प्राजधकारी आवश्यक समझे, आदिे द्वारा, या तो आिेपों को अनज्ञु ात कर
सकेगा या अननुज्ञात कर सकेगा।
6738 GI/2025 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
उक्त अजधजनयम की धारा-20घ की उप-धारा-(2) के अधीन सिम प्राजधकारी द्वारा ककया गया कोई आदेि
अंजतम होगा।
इस अजधसूचना के अधीन आने वाली भूजम का रेखांकन और भजू म के अन्द्य ब्यौरे उपलब्ध ह ैंऔर जहतबद्ध व्यजक्त
द्वारा सिम प्राजधकारी के उपयक्तुा कायाालय में उनका जनरीिण ककया िा सकता ह।ै
अनसु चू ी
उत्तर प्रदेि राज्य के मथरु ा जिल े म ें आगरा-पलवल सक्े िन म ें कक0मी0 1418/08-10 पर समपार सख्ं या 538 के स्ट्थान
पर 02 लने रोड ओवर जिि के जनमाणा हते ुअर्िता की िान ेवाली भजू म का सजं िप्त जववरण-
क्रम तहसील ग्राम खसरा स०ं अिना के जलए प्रस्ट्ताजवत ित्रे फत (हक्े टयर म ें)
1 2 3 4 5
1 छाता अकबरपुर 576/2 0.1140
2 582 जम० 0.0588
3 587 जम० 0.0960
4 728/1 0.0696
5 731/1 0.0900
6 732 जम० 0.0888
- - - योग 0.5172
[फा. सं.एनसीआर िीएसयू िून्द्य िीएसयू (िीएसयू)/1/2025/ओ/ओ सीपीएम/िीएसयू/एिीसी (कम््यूटर संख्या 132590)]
एनामलु हक, मुख्य प्रिासजनक अजधकारी (जनमााण)/सड़क सरु िा जपरयोिना
MINISTRY OF RAILWYS
(North Central Railway )
NOTIFICATION
Prayagraj, the 19th September, 2025
S.O. 4579(E).— In exercise of the powers conferred by sub – section (1) of Section 20A of the
Railways Act, 1989 (24 of 1989) Railway (amendment) Act, 2008 (11 of 2008) (hereinafter referred to
as the said Act), the Central Government after being satisfied that for the public purpose the land the
brief description of which is given in the schedule annexed hereto is required for the purpose of
Construction of 02 Lane Road Over Bridge in place of LC No. 538 on 1418/08-10 km. of Agra -
Palwal Section in District Mathura in the state of Uttar Pradesh hereby declares its intention to acquire
such land.
Any person interested in the said land may within a period of thirty days from the date
of publication of this notification in the Official Gazette, raise objection to the acquisition and use of
such land for the aforesaid purpose under sub section (1) of Section 20D of the said ACT.
Every such objection shall be made to the competent authority namely, Special land
Acquisition Officer Mathura. Uttar Pradesh in writing and shall set out the grounds there of and the
Competent Authority shall give objector an opportunity of being heard either in person or by legal
practitioner and may After hearing all such objections and after making such further enquir if any as the
Competent Authority thinks necessary by order either allow or disallow the objections;
Any order made by the Competent Authority under sub – section (2) of Section 20D of the said
Act shall be final;[भाग II—खण् ड 3(ii)] भारत का रािपत्र : असाधारण 3
The land plans and other details of the land covered under this notification are available And can
be inspected by the interested person at the aforesaid office of the competent Authority.
SCHEDULE
Brief description of land to be acquired for Construction of 02 Lane Road Over Bridge in place of
LC No. 538 on 1418/08-10 km. of Agra - Palwal Section in District Mathura in the State of Uttar
Pradesh.
Sl. Tehsil Name of the village Plot No. Area propose for land
No. Acquisition
(In Hect.)
1 2 3 4 5
1 Chhata Akbarpur 576/2 0.1140
2 582 M. 0.0588
3 587 M. 0.0960
4 728/1 0.0696
5 731/1 0.0900
6 732 M. 0.0888
- - - Total 0.5172
[F..No. NCR-GSU0GSU(GSU)/1/2025-O/o CPM/GSU/AGC (Computer No.132590)]
ANAMUL HAQUE, Chief Administrative Officer (Construction)/Road Safety Projects
अजधसचू ना
प्रयागराि, 19 जसतम्बर 2025
का.आ. 4580(अ).— केन्द्रीय सरकार, न े रेल अजधजनयम, 1989 (1989 का 24) एव ं रेलव े (संिोधन)
अजधजनयम 2008 (2008 का 11) (जिसे इसम ें इसके पश्चात ् उक्त अजधजनयम कहा गया ह)ै की धारा-20 ‘ए’ के खण्ड-
(1) द्वारा प्रदत्त िजक्तयों का प्रयोग करते हुये, यह समाधान हो िाने के पश्चात् कक लोक प्रयोिन के जलए, वह भूजम,
जिसका संजिप्त जववरण इससे उपाबद्ध अनुसूची में कदया गया है, उत्तर प्रदेि राज्य के मथरु ा जिले में आगरा-पलवल
सक्े िन म ें कक0मी0 1444/17-19 पर समपार सख्ं या 550 के स्ट्थान पर 02 लने रोड ओवर जिि के जनमाणा हते ु
अपेजित ह,ै ऐसी भूजम का अिना करने के आिय की घोषणा करती ह।ै
उक्त भूजम के जहतबद्ध कोई व्यजक्त, रािपत्र म ें इस अजधसूचना के प्रकािन की तारीख से 30 कदन के भीतर, उक्त
अजधजनयम की धारा-20घ की उप-धारा-(1) के अधीन उपयक्तुा प्रयोिन के जलए ऐसी भूजम के अिान और उपयोग के
सम्बन्द्ध में आिेप कर सकेगा।
प्रत्येक ऐसा आिेप, सिम प्राजधकारी अथाात ् जविेष भजू म अध्याजप्त अजधकारी, सयं क्तु सगं ठन, मथरु ा उत्तर
प्रदेि को जलजखत म ेंककया िायेगा और उसके आधार उपवर्णता करेगा और सिम प्राजधकारी आिेपकताा को व्यजक्तगत
रूप से या जवजध व्यवसायी के माध्यम से सुनवाई का अवसर प्रदान करेगा और ऐस ेआिेपों की सुनवाई करने तथा ऐसी
िाॅ च करने के पश्चात ्यकद कोई हो, जिसे सिम प्राजधकारी आवश्यक समझे, आदिे द्वारा, या तो आिेपों को अनुज्ञात
कर सकेगा या अननुज्ञात कर सकेगा।
उक्त अजधजनयम की धारा-20घ की उप-धारा-(2) के अधीन सिम प्राजधकारी द्वारा ककया गया कोई आदेि
अंजतम होगा।
इस अजधसूचना के अधीन आने वाली भूजम का रेखांकन और भूजम के अन्द्य ब्यौरे उपलब्ध ह ैंऔर जहतबद्ध व्यजक्त
द्वारा सिम प्राजधकारी के उपयक्तुा कायाालय में उनका जनरीिण ककया िा सकता ह।ै4 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
अनसु चू ी
उत्तर प्रदेि राज्य के मथरु ा जिल ेम ें आगरा-पलवल सक्े िन म ेंकक0मी0 1444/17-19 पर समपार सख्ं या 550 के स्ट्थान
पर 02 लने रोड ओवर जिि के जनमाणा हते ुअर्िता की िान ेवाली भजू म का सजं िप्त जववरण-
क्रम तहसील ग्राम खसरा स०ं अिना के जलए प्रस्ट्ताजवत ित्रे फत (हक्े टयर म ें)
1 2 3 4 5
1 छाता कोटबन 332 जम० 0.0600
2 944 0.0036
3 947 0.0720
4 1140 0.1071
5 1142 0.0762
6 1177 0.0180
7 1178 जम० 0.1092
8 1193 0.0432
9 1194 0.0138
- - - योग 0.5031
[फा. सं. एनसीआर िीएसयू िून्द्य िीएसयू (िीएसयू)/1/2025/ओ/ओ सीपीएम/िीएसयू/एिीसी (कम््यूटर संख्या 132590)]
एनामुल हक, मख्ु य प्रिासजनक अजधकारी (जनमााण)/सड़क सुरिा जपरयोिना
NOTIFICATION
Prayagraj, the 19th September, 2025
S.O. 4580(E).— In exercise of the powers conferred by sub – section (1) of Section 20A of the
Railways Act, 1989 (24 of 1989) Railway (amendment) Act, 2008 (11 of 2008) (hereinafter referred to
as the said Act), the Central Government after being satisfied that for the public purpose the land the
brief description of which is given in the schedule annexed hereto is required for the purpose of
Construction of 02 lane Road Over Bridge in place of LC No. 550 on 1444/17-19 km. of Agra –
Palwal Section in District Mathura in the state of Uttar Pradesh hereby declares its intsention to
acquire such land.
Any person interested in the said land may within a period of thirty days from the date of
publication of this notification in the Official Gazette, raise objection to the acquisition and use of such
land for the aforesaid purpose under sub section (1) of Section 20D of the said ACT.
Every such objection shall be made to the competent authority namely, Special land
Acquisition Officer Mathura. Uttar Pradesh in writing and shall set out the grounds there of and the
Competent Authority shall give objector an opportunity of being heard either in person or by legal
practitioner and may After hearing all such objections and after making such further enquiry if any as
the Competent Authority thinks necessary by order either allow or disallow the objections;
Any order made by the Competent Authority under sub – section (2) of Section 20D of the said
Act shall be final;
The land plans and other details of the land covered under this notification are available And can
be inspected by the interested person at the aforesaid office of the competent Authority.[भाग II—खण् ड 3(ii)] भारत का रािपत्र : असाधारण 5
SCHEDULE
Brief description of land to be acquired for Construction of 02 lane Road Over Bridge in place of
LC No. 550 on 1444/17-19 km. of Agra – Palwal Section in District Mathura in the State of Uttar
Pradesh.
Sl. Tehsil Name of the Plot No. Area propose for land
No. village Acquisition
(In Hect.)
1 2 3 4 5
1 Chhata Kotawan 332 M. 0.0600
2 944 0.0036
3 947 0.0720
4 1140 0.1071
5 1142 0.0762
6 1177 0.0180
7 1178 M. 0.1092
8 1193 0.0432
9 1194 0.0138
- - - Total 0.5031
[F. No. NCR-GSU0GSU(GSU)/1/2025-O/o CPM/GSU/AGC (Computer No.132590)]
ANAMUL HAQUE, Chief Administrative Officer (Construction)/Road Safety Projects
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.