Date: 2025-04-22Category: Extra OrdinaryState: Union GovernmentCountry: India
Construction of Road Over Bridge In lieu of Level Crossing No 209 at Km558/5 6 in between Mantralayam Matmari Stations as a Special Railway Project for acquisition of land in the State of Karnataka in the District of Raichur
Okay, I'm ready to analyze the provided policy text and generate the report.
**Report on Special Railway Project Notification**
**1. Executive Summary:**
This report analyzes a notification from the Ministry of Railways, South Central Railway, declaring the "Construction of Road Over Bridge In lieu of Level Crossing No. 209 at Km. 55856 in between Mantralayam Matmari Stations" as a Special Railway Project. The core purpose is to facilitate land acquisition in the Raichur district of Karnataka for this infrastructure project, deemed to be for a public purpose and of national importance. The key finding is that this notification triggers the application of the Railways Act, 1989, specifically clause 37A of Section 2, enabling expedited land acquisition for this specific project.
**2. Introduction:**
The purpose of this report is to provide an informative overview of a notification issued by the Ministry of Railways, South Central Railway, regarding a Special Railway Project. The analysis is based solely on the text of the provided notification.
**3. Policy Overview:**
This is a new policy declaration for this specific project. The core objective, inferred from the provided text, is to designate the construction of a road over bridge as a "Special Railway Project" to streamline land acquisition for its completion.
**4. Background and Rationale:**
This is a new policy declaration designating a specific project as a Special Railway Project. Therefore, inferring from the text, the likely problem/issue the policy addresses is the need to expedite the construction of a road over bridge to replace a level crossing, likely to improve safety, reduce traffic congestion, and enhance railway infrastructure. Level crossings can be dangerous and cause delays, and the designation as a special project suggests the government aims to accelerate the process to address these issues effectively.
**5. Key Provisions / Changes:**
* This notification declares the "Construction of Road Over Bridge In lieu of Level Crossing No. 209 at Km. 55856 in between Mantralayam Matmari Stations" as a "Special Railway Project."
* The designation as a "Special Railway Project" triggers the application of clause 37A of Section 2 of the Railways Act, 1989.
* This enables the Central Government to acquire land in the Raichur district of Karnataka for the project.
* The acquired land is to be used for providing national infrastructure for a public purpose.
* The notification takes effect from the date of its publication in the Official Gazette (April 22, 2025).
**6. Target Audience and Stakeholders:**
Based on the provided text, the directly affected stakeholders are:
* Landowners in the Raichur district of Karnataka where land acquisition will occur.
* Residents and commuters who will benefit from the improved infrastructure and reduced delays at the level crossing.
* The South Central Railway zone, responsible for implementing the project.
* The Central Government, responsible for land acquisition through the Railways Act.
* Construction companies and contractors involved in the project.
**7. Implementation Aspects (Inferred):**
* **Responsible agency/bodies:** The Ministry of Railways, South Central Railway is responsible for implementing the project. B RAMA KRISHNA, CPMGSUGTL (Chief Project Manager General Services Unit General Transport Logistics) is mentioned. The Central Government is responsible for facilitating land acquisition.
* **Timelines or procedures:** The notification takes effect immediately upon publication in the Official Gazette. The text does not specify exact timelines or procedures for land acquisition or project completion, but the designation as a "Special Railway Project" suggests a fast-tracked process.
* **Specific to changes:** Not applicable. The entire policy is new, so there are no prior implementation aspect changes.
**8. Expected Outcomes / Impact of Changes:**
The likely intended outcomes are:
* Faster and more efficient land acquisition for the road over bridge construction.
* Expedited construction of the road over bridge.
* Elimination of the level crossing, improving safety and reducing traffic delays.
* Enhanced railway infrastructure in the region.
* Improved connectivity and transportation for the public.
**9. Conclusion:**
The notification declaring the construction of a road over bridge as a Special Railway Project is a significant step towards improving railway infrastructure and public safety in the Raichur district of Karnataka. By designating the project as "special," the government aims to expedite land acquisition and project completion, ultimately benefiting the public through improved transportation and reduced risks associated with level crossings. The effective implementation of this notification is crucial to realizing its intended outcomes.
Key Entities Referenced
Railways Act, 1989: Act that confers power to the Central Government.
Section 2: Section of the Railways Act, 1989.
clause 37A: Clause within Section 2 of the Railways Act, 1989.
Ministry of Railways: Government organization issuing the notification.
Central Government: The entity exercising powers conferred by the Railways Act.
Karnataka: State where land acquisition will occur.
Raichur: District in Karnataka where land acquisition will occur.
S.O. 1832E: Notification number related to the railway project.
National Infrastructure: Purpose for which the land is being acquired.
Construction of Road Over Bridge In lieu of Level Crossing No. 209 at Km. 55856 in between Mantralayam Matmari Stations: A Special Railway Project for acquisition of land.
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99
सी.जी.-टी.एल.-अ.-23042025-262624
CG-TLxx-xEG-I2D3H0x4x2x0 25-262624
xxxGIDExxx
असाधारण
EXTRAORDINARY
भाग II—खण् ड 3—उप-खण्ड (ii)
PART II—Section 3—Sub-section (ii)
प्राजधकार स ेप्रकाजित
PUBLISHED BY AUTHORITY
स.ं 1799] नई कदल्ली, मगं लवार, अप्रलै 22, 2025/विै ाख 2, 1947 946
No. 1799] NEW DELHI, TUESDAY, APRIL 22, 2025/VAISAKHA 2, 1947 3, 1946
रेल मत्रं ालय
(दजिण मध्य रेलवे)
अजधसचू ना
जसकंदराबाद, 22 अप्रैल, 2025
का.आ. 1832(अ).—केंद्र सरकार, रेलवे अजधजनयम, 1989 की धारा 2 के खंड (37 क) द्वारा प्रदत्त
िजियों का प्रयोग करते हुए, एतद ्द्वारा, "मंत्रालयम-मटमारी स्ट्टेिनों के बीच ककमी 558/5-6 पर लेवल क्रॉससंग
संख्या 209 के स्ट्थान पर सड़क ऊपरी पुल का जनमााण" को िन प्रयोिन हते ु राष्ट्रीय अवसंरचना प्रदान करन े के
जलए कनााटक राज्य के रायचूर जिला में भजू म अजधग्रहण हते ु आजधकाररक रािपत्र में इस अजधसूचना के प्रकािन
की तारीख से एक जविेष रेल पररयोिना के रूप में अजधसजू चत करती है
[ फा. सं. W. Con/RSP/Gazette /LC. 209 /GY-WADI /GSU/GTL]
बी राम कृष्ण, सीपीएम / िीएसय ू / िीटीएल
2693 GI/2025 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
MINISTRY OF RAILWAYS
(South Central Railway)
NOTIFICATION
Secunderabad, the 22nd April, 2025
S.O. 1832(E).—In exercise of the powers conferred by clause (37A) of Section 2 of the Railways Act, 1989
the Central Government hereby notifies "Construction of Road Over Bridge In lieu of Level Crossing No. 209 at Km.
558/5-6 in between Mantralayam - Matmari Stations " as a Special Railway Project for acquisition of land in the State
of Karnataka in the District of Raichur for providing National Infrastructure for a public purpose with effect from the
date of publication of this notification in the Official Gazette.
[F. No. W. Con/RSP/Gazette /LC. 209 /GY-WADI /GSU/GTL]
B RAMA KRISHNA, CPM/GSU/GTL
.
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.