## Policy Analysis Report: Corrigendum Regarding Construction of Road Over Bridge, South Central Railways
**1. Executive Summary:**
This report analyzes a corrigendum issued by the Ministry of Railways, South Central Railways, concerning the construction of a Road Over Bridge (ROB) in lieu of Level Crossing No. 331 at Km. 46324 between Telaprolu and Nuzividu stations. The corrigendum addresses an error in the original notification, specifically correcting the district where the land acquisition for the project will occur. This amendment clarifies the project's location, impacting land acquisition processes and potentially affecting stakeholders in the corrected district.
**2. Introduction:**
The purpose of this report is to provide an informative analysis of the corrigendum published by the Ministry of Railways, South Central Railways, on June 10, 2025 (S.O. 2537E). This analysis is based solely on the text provided in the official notification and aims to elucidate the changes introduced and their potential implications.
**3. Policy Overview:**
* **Amendment:** This document is a corrigendum, meaning it amends a previously issued notification. The original policy being amended is the Ministry of Railways' notification published on September 24, 2024 (S.O. 4178E), concerning the Construction of a Road Over Bridge in lieu of Level Crossings in the District of Krishna, Andhra Pradesh.
* **Core Objective(s):** The original policy's objective, as inferred from the provided text, is to facilitate the construction of a Road Over Bridge (ROB) in place of a Level Crossing to enhance safety and efficiency in railway operations, designated as a "Special Railway Project".
**4. Background and Rationale:**
This corrigendum addresses an error in the original notification (S.O. 4178E) regarding the district in Andhra Pradesh where land acquisition for the ROB project will take place. The original notification incorrectly stated the district as "Krishna", while the corrigendum indicates it should be "NTR." The likely reason for this amendment is to ensure accurate land acquisition processes and avoid potential legal challenges or delays arising from an incorrect designation of the project's location.
**5. Key Provisions / Changes:**
This is an amendment. Therefore, the focus is on the changes:
* **Specific Part of Original Policy Changed:** The original notification (S.O. 4178E) is being corrected with regard to the location (district) where the land acquisition for the Road Over Bridge project will occur.
* **New Rule/Provision:** The corrigendum replaces "District of Krishna" with "District of NTR" in the notification.
* **Difference/Effect of Change:** This correction changes the geographical area where land acquisition will be conducted. This will redirect resources and administrative efforts towards land acquisition within the NTR district rather than the Krishna district.
**6. Target Audience and Stakeholders:**
The primary target audience and stakeholders directly affected by this amendment include:
* **Residents and landowners in NTR district:** These individuals are directly affected by the land acquisition process now correctly identified within their district.
* **Government authorities in NTR district:** Local administrative bodies responsible for facilitating land acquisition and project approvals within the NTR district.
* **Ministry of Railways officials:** Personnel involved in the land acquisition, construction, and legal aspects of the Road Over Bridge project.
* **Construction companies:** Companies involved in the construction of the Road Over Bridge, as the location impacts logistics and operations.
**7. Implementation Aspects (Inferred):**
* **Responsible agency/bodies mentioned:** The Ministry of Railways, specifically South Central Railways, is the responsible agency. Chief Engineer/CRSP, Manoj Kumar, is mentioned as the official responsible.
* **Timelines or procedures specified:** The corrigendum takes effect from the date of its publication in the Official Gazette (June 10, 2025). While specific timelines are not mentioned in this document, the implication is that land acquisition processes in the NTR district should commence or continue based on this corrected information.
* **Focus on changes:** This amendment necessitates the Ministry to redirect its communications, survey and land acquisition efforts from Krishna district to NTR district.
**8. Expected Outcomes / Impact of Changes:**
The intended outcome of this correction is to ensure accurate and legally sound land acquisition procedures for the Road Over Bridge project. By rectifying the district designation, the Ministry of Railways aims to avoid potential delays, legal challenges, and compensation disputes that could arise from acquiring land in the wrong location. The impact should be a smoother land acquisition process and the timely commencement of the construction project in the correct geographical area.
**9. Conclusion:**
The corrigendum issued by the Ministry of Railways, South Central Railways, represents a crucial correction to the original notification regarding the Construction of a Road Over Bridge. By changing the designated district for land acquisition from Krishna to NTR, the amendment ensures the project proceeds with accurate geographical information, which is essential for the land acquisition process. This correction will facilitate the project's execution and avoid legal and administrative complications, thereby contributing to the enhancement of railway infrastructure and public safety.
Key Entities Referenced
NEW DELHI: Location of publication of the Gazette of India.
JUNE 10, 2025: Date of the Gazette of India publication.
MINISTRY OF RAILWAYS: The government ministry responsible for the notification.
South Central Railways: The specific railway zone issuing the corrigendum.
Secunderabad: Location where the corrigendum was issued.
10th June, 2025: Date of the corrigendum.
S.O. 2537E: Notification number being corrected.
Gazette of India: Official publication in which the original notification appeared.
Extraordinary, Part II, Section 3, Subsection ii: Specific section of the Gazette of India where the original notification was published.
24th September, 2024: Date of the original notification (S.O. 4178E).
S.O. 4178E: Original notification number regarding Construction of Road Over Bridge.
Construction of Road Over Bridge: Subject of the original notification and the corrigendum.
Level Crossings: Infrastructure being replaced by the Road Over Bridge.
District of Krishna: District where the Road Over Bridge is located (corrected location).
State of Andhra Pradesh: State where the Road Over Bridge is located.
Railways Act, 1989: The Act under which the powers are conferred.
Central Government: The government body issuing the notification.
Level Crossing No. 331: Specific level crossing being replaced.
Km. 46324: Kilometer marker along the railway line.
Telaprolu Nuzividu stations: Railway stations between which the level crossing is located.
Special Railway Project: Designation of the project for land acquisition purposes.
District of NTR: District where the Road Over Bridge was originally said to be located (incorrect location).
National Infrastructure: Category under which the project falls.
Official Gazette: Official publication for government notifications.
F. No. RSPSCGazette 37ALC.331 BZAVSKPBZACorrigendum01: File number for the corrigendum.
MANOJ KUMAR: Name of the Chief EngineerCRSP.
Government of India Press, Ring Road, Mayapuri, New Delhi110064: Place of printing.
Controller of Publications, Delhi110054: Publisher of the Gazette.
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99
सी.जी.-टी.एल.-अ.-11062025-263721
CG-TLxx-xEG-I1D1H0x6x2x0 25-263721
xxxGIDExxx
असाधारण
EXTRAORDINARY
भाग II—खण्ड 3—उप-खण्ड (ii)
PART II—Section 3—Sub-section (ii)
प्राजधकार स ेप्रकाजित
PUBLISHED BY AUTHORITY
स.ं 2477] नई ददल्ली, मगं लवार, िनू 10, 2025/ज्य ष्े ठ 20, 1947
No. 2477] NEW DELHI, TUESDAY, JUNE 10, 2025/JYAISTHA 20, 1947
रेल मत्रं ालय
(दजिण मध्य रेलव)े
िजु ि-पत्र
जसकंदराबाद, 10 िून, 2025
का.आ. 2537(अ).—भारत सरकार, रेल मंत्रालय की अजधसचू ना, िो एस.ओ. 4178 (अ) के अतं गतग भारत के
रािपत्र, असाधारण, भाग II, धारा 3, उप-धारा (ii) ददनांदकत 24 जसतंबर, 2024 को “आध्रं प्रदेि राज्य के कृष्ण जिला
म ें जस्ट्ित समपार फाटक के स्ट्िान पर ऊपरी पैदल पुल का जनमागण” के संबंध म ें प्रकाजित हुई िी, म ें रेल मंत्रालय एतद्द्वारा
जनम्नजलजखत िुजिपची तैयार करता ह,ै जिसका जववरण नीचे ददया गया ह:ै
क्र. स.ं इस रूप म ेंप्रकाजित इस प्रकार पढा िाए
1 केंद्र सरकार, रेलवे अजधजनयम, 1989 के केंद्र सरकार, रेलव े अजधजनयम, 1989 के
एस.ओ. 4178(अ) के अंतगतग धारा 2 के खंड एस.ओ. 4178(अ) के अतं गतग धारा 2 के खडं (37 क) ,
(37 क), ददनांदकत 24 जसतंबर, 2024 द्वारा प्रदत्त ददनांदकत 24 जसतंबर, 2024 द्वारा प्रदत्त िजियों का
िजियों का प्रयोग करत े हुए, एतद्वारा, “तेलप्रोलु- प्रयोग करत े हुए, एतद्वारा, “तले प्रोल-ु नूजिवीडू के बीच
नूजिवीडू के बीच दक.मी. 463/2-4 पर जस्ट्ित रेलवे दक.मी. 463/2-4 पर जस्ट्ित रेलवे फाटक नंबर 331 पर
फाटक नंबर 331 पर रोड ओवर जिि का जनमागण” रोड ओवर जिि का जनमागण” को िन प्रयोिन हते ु
को िन प्रयोिन हते ु राष्ट्रीय अवसंरचना प्रदान करन े राष्ट्रीय अवसंरचना प्रदान करने के जलए आंध्र प्रदेि
3750 GI/2025 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
के जलए आंध्र प्रदेि राज्य के एनटीआर जिला म ें भूजम राज्य के कृष्ण जिला म ें भूजम अजधग्रहण हते ु
अजधग्रहण हते ु आजधकाररक रािपत्र में इस आजधकाररक रािपत्र में इस अजधसूचना के प्रकािन की
अजधसूचना के प्रकािन की तारीख से एक जविेष रेल तारीख से एक जविेष रेल पररयोिना के रूप म ें
पररयोिना के रूप म ेंअजधसूजचत करती ह.ै अजधसूजचत करती ह.ै
[फा. स.ं RSP/SC/Gazette/37A/LC.331/BZA-VSKP/BZA/Corrigendum/01]
मनोि कुमार, मुख्य इंिीजनयर/जन/आरएसपी
MINISTRY OF RAILWAYS
(South Central Railways)
CORRIGENDUM
Secunderabad, the 10th June, 2025
S.O. 2537(E).—In the notification of the Government of India, Ministry of Railways published in the
Gazette of India, Extraordinary, Part II, Section 3, Sub-section (ii) Dated 24th September, 2024 vide S.O. 4178(E)
regarding “Construction of Road Over Bridge in lieu of Level Crossings in the District of Krishna, in the of State of
Andhra Pradesh” the Ministry of Railways hereby makes the following corrigendum as detailed below:
Sl. No. Published as To be read as
1 In exercise of the powers conferred by clause (37A) of In exercise of the powers conferred by clause
Section 2 dated 24th September, 2024 vide (37A) of Section 2 dated 24th September, 2024
S.O. 4178(E) of the Railways Act, 1989 the Central vide S.O. 4178(E) of the Railways Act, 1989 the
Government hereby notifies "Construction of Road Central Government hereby notifies "Construction
Over Bridge in lieu of Level Crossing No. 331 at of Road Over Bridge in lieu of Level Crossing
Km. 463/2-4 between Telaprolu – Nuzividu stations" No. 331 at Km. 463/2-4 between Telaprolu –
as a Special Railway Project for acquisition of land in Nuzividu stations" as a Special Railway Project for
the State of Andhra Pradesh in the District of NTR for acquisition of land in the State of Andhra Pradesh
providing National Infrastructure for a public purpose in the District of Krishna for providing National
with effect from the date of publication of this Infrastructure for a public purpose with effect from
notification in the Official Gazette. the date of publication of this notification in the
Official Gazette.
[F. No. RSP/SC/Gazette /37A/LC.331 /BZA-VSKP/BZA/Corrigendum/01]
MANOJ KUMAR, Chief Engineer/C/RSP
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.