Home India Ministry of Railways Construction of Road Over Bridge in lieu of Level Crossing N...
Date: 2025-05-19 Category: Extra Ordinary State: Union Government Country: India

Construction of Road Over Bridge in lieu of Level Crossing No 68 at Km 226/12 14 in between Rechini Road and Repallewada stations

Issued by Ministry of Railways · Construction Department

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

## Policy Analysis Report: Authorization of Competent Authority for Land Acquisition - Road Over Bridge Project in Telengana **1. Executive Summary:** This report analyzes a notification from the Ministry of Railways, South Central Railway, authorizing a Competent Authority for Land Acquisition for a specific railway project. The notification, published in the Gazette of India on May 19, 2025, designates the Revenue Divisional Officer, Bellampally, Mancherial District, Telengana, as the Competent Authority for Land Acquisition for the construction of a Road Over Bridge in lieu of Level Crossing No. 68 at Km 2261214. This report outlines the key provisions of this authorization, its likely rationale, and its potential impact on the identified stakeholders. The primary finding is the empowerment of a specific officer to facilitate land acquisition necessary for a railway infrastructure project. **2. Introduction:** The purpose of this report is to provide an informative analysis of a notification issued by the Ministry of Railways, South Central Railway, regarding the authorization of a Competent Authority for Land Acquisition related to a railway infrastructure project in Telengana. The analysis is based solely on the provided text of the notification. **3. Policy Overview:** This is a new policy authorization regarding land acquisition competence for a specific project under the Railways Act, 1989. * **Core Objective:** The core objective, as inferred from the text, is to facilitate the acquisition of land necessary for the "Construction of Road Over Bridge in lieu of Level Crossing No. 68 at Km 2261214 in between Rechini Road and Repallewada stations" by formally authorizing a Competent Authority. **4. Background and Rationale:** The notification addresses the need to expedite land acquisition processes for railway infrastructure projects. The construction of a Road Over Bridge (ROB) in place of an existing level crossing suggests a need to improve safety and efficiency of rail and road traffic. Authorizing a Competent Authority is a procedural step to enable the project to proceed. The rationale is likely to streamline the land acquisition process, reduce delays, and ensure the timely completion of the infrastructure project. **5. Key Provisions / Changes:** This is a new authorization, not an amendment. The notification establishes the following: * **Designation of Competent Authority:** The Revenue Divisional Officer, Bellampally, Mancherial District, Telengana, is officially designated as the Competent Authority for Land Acquisition for the specific railway project. * **Project Scope:** The authorization is limited to the "Construction of Road Over Bridge in lieu of Level Crossing No. 68 at Km 2261214 in between Rechini Road and Repallewada stations" in Telengana. * **Legal Basis:** The authorization is granted under the powers conferred by clause 7A of Section 2 of the Railways Act, 1989. * **Effectiveness:** The authorization is effective from the date of publication of the notification in the Official Gazette (May 19, 2025). **6. Target Audience and Stakeholders:** Based on the provided text, the directly affected stakeholders include: * **Landowners in the Mancherial District, Telengana:** Those whose land falls within the area required for the Road Over Bridge project are directly affected by the potential land acquisition. * **Residents of the Area:** The construction of the Road Over Bridge will impact residents near the project location, potentially requiring relocation. * **Ministry of Railways and South Central Railway:** As the project proponents, they are directly affected by the authorization. * **Revenue Divisional Officer, Bellampally:** This individual assumes the responsibility and authority for land acquisition. **7. Implementation Aspects (Inferred):** * **Responsible Agency:** The Revenue Divisional Officer, Bellampally, is the primary responsible agency for implementing the land acquisition process. The Ministry of Railways and South Central Railway are overseeing the project. * **Procedures:** While the notification itself doesn't detail specific procedures, it implies that the Competent Authority will follow established land acquisition procedures as outlined in relevant legislation, including the Railways Act, 1989, and potentially other applicable laws. * **Timeline:** The effective date is specified, however, specific timelines for land acquisition are not mentioned in the provided text. **8. Expected Outcomes / Impact of Changes:** The intended outcome of this authorization is to facilitate the timely and efficient acquisition of land for the construction of the Road Over Bridge. The expected impact includes: * **Expedited Project Implementation:** By authorizing a Competent Authority, the land acquisition process should be streamlined, leading to faster project completion. * **Improved Transportation Infrastructure:** The construction of the Road Over Bridge is expected to improve the transportation infrastructure by replacing a level crossing, enhancing safety and reducing traffic congestion. * **Potential Displacement:** The land acquisition process may result in displacement of landowners. * **Economic Development:** Road Over Bridge construction can contribute to broader economic activity in the region. **9. Conclusion:** The notification analyzed authorizes the Revenue Divisional Officer, Bellampally, as the Competent Authority for Land Acquisition for the Road Over Bridge project in Telengana. This authorization is a necessary step towards the realization of the railway infrastructure project. The implementation of this authorization will directly impact landowners and residents in the project area, while contributing to improved transportation infrastructure and regional development. This report is based solely on the provided text; a more complete analysis would require further information regarding the project details and applicable land acquisition regulations.

Key Entities Referenced

INDIA: Country where the Gazette is published. NEW DELHI: Place of Publication MAY 19, 2025: Date of Notification VAISAKHA 29, 1947: Date of Notification as per the Indian national calendar. THE GAZETTE OF INDIA: Title of the Gazette in which the notification is published. PART IISEC. 3ii: Section of the Gazette of India. MINISTRY OF RAILWAYS: Government Ministry issuing the notification. South Central Railway: Railway zone associated with the notification. NOTIFICATION: Type of document. Secunderabad: Location of the South Central Railway office. 13th May, 2025: Date of the notification issued by South Central Railway. S.O. 2228E: Notification number. Central Government: Government body exercising powers under the Railways Act. Railways Act, 1989: Law under which the powers are conferred. Competent Authority for Land Acquisition: Official authorized to perform functions related to land acquisition for railway projects. Special Railway Project: Type of project for which land acquisition is being authorized. Official Gazette: Publication in which the notification will be published. Telengana: State where the Special Railway Project is located. Mancherial: District where the Special Railway Project is located. Revenue Divisional Officer, Bellampally: Designation and location of the Competent Authority for Land Acquisition. Construction of Road Over Bridge in lieu of Level Crossing No. 68 at Km. 2261214 in between Rechini Road and Repallewada stations: Specific railway project for which land acquisition is being authorized. F. No. DYCECONRSPROBLAND AQ20257A122: File number associated with the notification. MANOJ KUMAR: Name of the Chief EngineerCRSP. Chief EngineerCRSP: Designation of the person who Uploaded by Dte. of Printing Government of India Press, Ring Road, Mayapuri, New Delhi110064: Place of Uploaded by Dte. of Printing Controller of Publications, Delhi110054: Publisher of the Gazette.
Official Source Record View Original Source →
See Full Document Text
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99 सी.जी.-टी.एल.-अ.-19052025-263228 CG-TLxx-xEG-I1D9H0x5x2x0 25-263228 xxxGIDExxx असाधारण EXTRAORDINARY भाग II—खण्ड 3—उप-खण्ड (ii) PART II—Section 3—Sub-section (ii) प्राजधकार स ेप्रकाजित PUBLISHED BY AUTHORITY स.ं 2174] नई ददलली, सोमवार, मई 19, 2025/विै ाख 29, 1947 No. 2174] NEW DELHI, MONDAY, MAY 19, 2025/VAISAKHA 29, 1947 रेल मत्रं ालय (दजिण मध्य रेलव)े अजधसचू ना जसकंदराबाद, 13 मई, 2025 का.आ. 2228(अ).— केंद्र सरकार, रेलव ेअजधजनयम, 1989 की धारा 2 के खंड (7क) द्वारा प्रदत्त िजियों का प्रयोग करते हुए, एतद्द्वारा नीचे दी गई ताजलका के कॉलम (5) में उजललजखत अजधकारी को आजधकाररक रािपत्र में इस अजधसूचना के प्रकािन की तारीख से उि ताजलका के कॉलम (3) में उजललजखत राज्य म ें जनष्पादन, रखरखाव, प्रबंधन और संचालन के जलए ताजलका के कॉलम (2) में उजललजखत जविेष रेलवे पररयोिना के संबंध में सिम प्राजधकारी के कायों को जनष्पाददत करन े के जलए प्राजधकृत करती हIै 3269 GI/2025 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ताजलका क्र.सं. जविेष रेलवे पररयोिना राज्य जिला भूजम अजधग्रहण के जलए सिम प्राजधकारी (1) (2) (3) (4) (5) 1. रेचनी रोड और रेपललीवाडा में दकमी तेलगं ाना मंजचयााल रािस्ट्व मंडल अजधकारी, 226/12-14 पर समपार फाटक सं. 68 के बेलमपलली स्ट्थान पर ऊपरी सडक पलु का जनमााण [फा. स.ं DYCE/CON/RSP/ROB/LAND AQ/2025/7A/122] मनोि कुमार, मुख्य इंिीजनयर/सी/ आरएसपी MINISTRY OF RAILWAYS (South Central Railway) NOTIFICATION Secunderabad, the 13th May, 2025 S.O. 2228(E).— In exercise of the powers conferred by clause (7A) of Section 2 of the Railways Act, 1989 the Central Government hereby authorizes the officer mentioned in the column (5) of the Table below to perform the functions of the Competent Authority for Land Acquisition in respect of the Special Railway Project as mentioned in column (2) of the Table for execution, maintenance, management and operation in the state mentioned in column (3) of the said table with effect from the date of publication of this notification in the Official Gazette. TABLE Sl.No. Special Railway Project State District Competent authority for Land Acquisition (1) (2) (3) (4) (5) 1. Construction of Road Over Bridge in Telengana Mancherial Revenue Divisional Officer, lieu of Level Crossing No. 68 at Km. Bellampally 226/12-14 in between Rechini Road and Repallewada stations [F. No. DYCE/CON/RSP/ROB/LAND AQ/2025/7A/122] MANOJ KUMAR, Chief Engineer/C/RSP Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.

Continue your research