Date: 2025-05-19 Category: Extra Ordinary State: Union Government Country: India

Construction of Road Over Bridge in lieu of Level Crossing No16 at Km 15/20 22 between Nidamanuru and Uppaluru stations

Issued by Ministry of Railways · Construction Department

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

## Policy Analysis Report: Authorization of Competent Authority for Land Acquisition - South Central Railway **1. Executive Summary:** This report analyzes a notification issued by the Ministry of Railways, South Central Railway, authorizing an officer to perform the functions of the Competent Authority for Land Acquisition for a specific railway project. The notification concerns the construction of a Road Over Bridge in Andhra Pradesh, specifically in lieu of Level Crossing No. 16 at Km. 152022 between Nidamanuru and Uppaluru stations. The Revenue Divisional Officer, Vijayawada (Andhra Pradesh) is designated as the Competent Authority for Land Acquisition related to this project. This authorization is crucial for the timely execution of the project, which aims to improve railway infrastructure and safety. **2. Introduction:** The purpose of this report is to provide an informative overview of a notification published in the Gazette of India regarding the authorization of a Competent Authority for Land Acquisition by the Ministry of Railways, South Central Railway. The analysis is based solely on the provided text. **3. Policy Overview:** This is a new policy specifically granting authority for land acquisition for a specific project. The core objective, as inferred from the text, is to facilitate the acquisition of land necessary for the "Construction of Road Over Bridge in lieu of Level Crossing No.16 at Km. 152022 between Nidamanuru and Uppaluru stations" project. **4. Background and Rationale:** This is a new policy authorization. The policy likely addresses the need for efficient and legally sound land acquisition processes for railway infrastructure projects. The construction of a Road Over Bridge (ROB) in place of a level crossing suggests the intent to improve safety and reduce traffic congestion at that location. Efficient land acquisition is vital to prevent delays and cost overruns that could arise from disputes over land rights. **5. Key Provisions / Changes:** This is a new policy authorization for a land acquisition. The notification establishes the following key provisions: * **Authorization:** The Central Government, exercising powers conferred by clause 7A of Section 2 of the Railways Act, 1989, authorizes a specific officer to act as the Competent Authority for Land Acquisition. * **Specific Project:** The authorization applies to the "Construction of Road Over Bridge in lieu of Level Crossing No.16 at Km. 152022 between Nidamanuru and Uppaluru stations" project. * **Geographic Scope:** The authorization is specific to the state of Andhra Pradesh. * **Designated Authority:** The Revenue Divisional Officer, Vijayawada is designated as the Competent Authority for Land Acquisition. * **Effective Date:** The authorization is effective from the date of publication of the notification in the Official Gazette (May 19, 2025). **6. Target Audience and Stakeholders:** Based on the provided text, the directly affected stakeholders include: * **The Revenue Divisional Officer, Vijayawada:** Designated Competent Authority responsible for land acquisition. * **Landowners in the Vijayawada district, Andhra Pradesh:** Potentially impacted by land acquisition for the ROB project. * **South Central Railway:** The entity undertaking the railway project and benefiting from the land acquisition. * **Commuters and Residents in the Vicinity:** Benefiting from improved safety and reduced congestion with the completion of the ROB. **7. Implementation Aspects (Inferred):** * **Responsible Agency:** The Ministry of Railways, through the South Central Railway, is ultimately responsible for implementing the project. The Revenue Divisional Officer, Vijayawada, is the designated authority for land acquisition. * **Procedures:** The notification operates under the framework of the Railways Act, 1989. Land acquisition will presumably follow established legal procedures outlined in relevant land acquisition laws and regulations. * **Timelines:** The authorization takes effect from the date of publication (May 19, 2025), suggesting an immediate start to the land acquisition process. Further timelines would be defined by project needs and the legal process. **8. Expected Outcomes / Impact of Changes:** The intended outcomes of this policy authorization are: * **Efficient Land Acquisition:** Streamlined process for acquiring land required for the Road Over Bridge project. * **Project Advancement:** Facilitation of timely project execution by resolving land-related hurdles. * **Improved Railway Infrastructure:** Advancement of the ROB project will eventually contribute to modernized infrastructure. * **Enhanced Safety and Reduced Congestion:** The Road Over Bridge is expected to improve safety and reduce traffic congestion at the level crossing. **9. Conclusion:** The notification analyzed provides a critical authorization for land acquisition, enabling the South Central Railway to proceed with the construction of a Road Over Bridge in Andhra Pradesh. By designating the Revenue Divisional Officer, Vijayawada, as the Competent Authority, the policy aims to streamline the land acquisition process, facilitate project implementation, and ultimately improve railway infrastructure, safety, and transportation efficiency. This authorization is significant for the project's progression and the realization of its intended benefits for the region.

Key Entities Referenced

INDIA: Country where the Gazette is published. NEW DELHI: City of publication. MAY 19, 2025: Date of the Gazette publication. VAISAKHA 29, 1947: Date in the Hindu calendar, corresponding to the date of publication. THE GAZETTE OF INDIA: Title of the published document. PART IISEC. 3ii: Section of the Gazette. MINISTRY OF RAILWAYS: Issuing authority of the notification. South Central Railway: Railway zone associated with the notification. NOTIFICATION: Type of document. Secunderabad: Location of the notification's origin. 13th May, 2025: Date of the notification. S.O. 2226E: Notification number. Central Government: Government body exercising powers under the Railways Act. Railways Act, 1989: Act under which the powers are conferred. Section 2: Section of the Railways Act, 1989. clause 7A: Clause of Section 2 of the Railways Act, 1989. Competent Authority for Land Acquisition: Role authorized to perform functions related to land acquisition. Special Railway Project: Type of project for which land acquisition is authorized. Official Gazette: Gazette in which the notification is to be published. Construction of Road Over Bridge: Specific project for which land is being acquired. Andhra Pradesh: State in which the project is located. NTR: District where the project is to be constructed Revenue Divisional Officer: Competent Authority for Land Acquisition for project. Vijayawada: Area under the jurisdiction of the Competent Authority. Level Crossing No.16: Existing level crossing to be replaced by the Road Over Bridge. Km. 152022: Kilometer marking along the railway line. Nidamanuru: One of the railway stations near the project site. Uppaluru: Another railway station near the project site. F. No. DYCECONRSPROBLAND AQ20257A121: File number associated with the notification. MANOJ KUMAR: Chief EngineerCRSP. Government of India Press, Ring Road, Mayapuri, New Delhi110064: Location of the printing press. Delhi110054: Location of the Controller of Publications.
Official Source Record View Original Source →
See Full Document Text
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99 सी.जी.-टी.एल.-अ.-19052025-263224 CG-TLxx-xEG-I1D9H0x5x2x0 25-263224 xxxGIDExxx असाधारण EXTRAORDINARY भाग II—खण्ड 3—उप-खण्ड (ii) PART II—Section 3—Sub-section (ii) प्राजधकार स ेप्रकाजित PUBLISHED BY AUTHORITY स.ं 2172] नई ददलली, सोमवार, मई 19, 2025/विै ाख 29, 1947 No. 2172] NEW DELHI, MONDAY, MAY 19, 2025/VAISAKHA 29, 1947 रेल मत्रं ालय (दजिण मध्य रेलव)े अजधसचू ना जसकंदराबाद, 13 मई, 2025 का.आ. 2226(अ).— केंद्र सरकार, रेलव ेअजधजनयम, 1989 की धारा 2 के खंड (7क) द्वारा प्रदत्त िजियों का प्रयोग करते हुए, एतद्द्वारा नीचे दी गई ताजलका के कॉलम (5) में उजललजखत अजधकारी को आजधकाररक रािपत्र में इस अजधसूचना के प्रकािन की तारीख से उि ताजलका के कॉलम (3) में उजललजखत राज्य म ें जनष्पादन, रखरखाव, प्रबंधन और संचालन के जलए ताजलका के कॉलम (2) में उजललजखत जविेष रेलवे पररयोिना के संबंध में सिम प्राजधकारी के कायों को जनष्पाददत करन े के जलए प्राजधकृत करती ह ैI 3267 GI/2025 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ताजलका क्र.सं. जविेष रेलवे पररयोिना राज्य जिला भूजम अजधग्रहण के जलए सिम प्राजधकारी (1) (2) (3) (4) (5) 1. जनडमानूरु - उप्पलरुु के बीच दक.मी. आंध्र प्रदेि एन.रट.आर रािस्ट्व मंडल अजधकारी, 15/20-22 पर जस्ट्ित रेलवे फाटक नंबर जवियवाडा 16 पररोड ओवर जििका जनमााण [फा. स.ं DYCE/CON/RSP/ROB/LAND AQ/2025/7A/121] मनोि कुमार, मुख्य इंिीजनयर/सी/ आरएसपी MINISTRY OF RAILWAYS (South Central Railway) NOTIFICATION Secunderabad, the 13th May, 2025 S.O. 2226(E).— In exercise of the powers conferred by clause (7A) of Section 2 of the Railways Act, 1989 the Central Government hereby authorizes the officer mentioned in the column (5) of the Table below to perform the functions of the Competent Authority for Land Acquisition in respect of the Special Railway Project as mentioned in column (2) of the Table for execution, maintenance, management and operation in the state mentioned in column (3) of the said table with effect from the date of publication of this notification in the Official Gazette. TABLE Sl.No. Special Railway Project State District Competent authority for Land Acquisition (1) (2) (3) (4) (5) 1. Construction of Road Over Bridge in Andhra NTR Revenue Divisional Officer, lieu of Level Crossing No.16 at Km. Pradesh Vijayawada. 15/20-22 between Nidamanuru and Uppaluru stations [F. No. DYCE/CON/RSP/ROB/LAND AQ/2025/7A/121] MANOJ KUMAR, Chief Engineer/C/RSP Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.