Date: 2025-04-22Category: Extra OrdinaryState: Union GovernmentCountry: India
Construction of Road Over Bridge In lieu of Level Crossing No216 at Km555/1 2 in between Marichethal Raichur Stations as a Special Railway Project for acquisition of land in the State of Karnataka in the District of Raichur
## Policy Analysis Report: Construction of Road Over Bridge - South Central Railway
**1. Executive Summary:**
This report analyzes a notification from the Ministry of Railways, South Central Railway, designating the "Construction of Road Over Bridge In lieu of Level Crossing No. 216 at Km. 55512 in between Marichethal Raichur Stations" as a Special Railway Project. This designation facilitates land acquisition in the Raichur District of Karnataka for this infrastructure project, classifying it as a national infrastructure project serving a public purpose. The key finding is that this project is being expedited through the 'Special Railway Project' designation to streamline land acquisition, ultimately improving railway infrastructure and public safety by replacing a level crossing with a road over bridge.
**2. Introduction:**
This report provides an analysis of a notification issued by the Ministry of Railways, South Central Railway, regarding the construction of a Road Over Bridge. The analysis is based solely on the content of the provided official gazette notification. The purpose of this report is to inform affected industry of the policy.
**3. Policy Overview:**
This is a new policy initiative.
* **Core Objective:** The core objective, as inferred from the provided text, is to expedite the "Construction of Road Over Bridge In lieu of Level Crossing No. 216 at Km. 55512 in between Marichethal Raichur Stations" by designating it as a Special Railway Project. A core part of the objective is to facilitate land acquisition in the State of Karnataka in the District of Raichur.
**4. Background and Rationale:**
As a new policy initiative, this action likely addresses issues related to:
* **Public Safety:** Level crossings can be hazardous. Replacing them with road over bridges significantly reduces the risk of accidents.
* **Traffic Congestion:** Level crossings often cause traffic delays. A road over bridge eliminates these delays, improving traffic flow.
* **Infrastructure Development:** The project is described as providing "National Infrastructure for a public purpose," suggesting a broader goal of improving the national transportation network.
* **Project Delays:** Land acquisition is a common bottleneck for infrastructure projects in India. Designating it as a "Special Railway Project" suggests an attempt to accelerate the process through the powers conferred by clause 37A of Section 2 of the Railways Act, 1989.
**5. Key Provisions / Changes:**
This is a new policy designating the Road Over Bridge as a Special Railway Project.
* **Main Component:** The core provision is the designation of the "Construction of Road Over Bridge In lieu of Level Crossing No. 216 at Km. 55512 in between Marichethal Raichur Stations" as a "Special Railway Project."
* **Key Actions Mandated:** The designation triggers the application of clause 37A of Section 2 of the Railways Act, 1989, allowing for expedited land acquisition in the State of Karnataka in the District of Raichur.
* **Effect:** This designation provides the Central Government with greater authority and potentially streamlined processes for acquiring the necessary land for the project.
**6. Target Audience and Stakeholders:**
The directly affected stakeholders are:
* **Landowners in Raichur District, Karnataka:** The policy directly impacts individuals and entities owning land needed for the construction of the road over bridge, as it pertains to land acquisition.
* **Residents of areas around Marichethal and Raichur Stations:** This policy impacts these residents with a road over bridge to be used for transport, reducing the risks involved with the previous Level Crossing.
* **Commuters and businesses relying on transportation infrastructure in the area:** The improved infrastructure aims to benefit those relying on the roads by removing the level crossing.
* **Construction companies and related industries:** The policy will likely impact and benefit construction companies.
**7. Implementation Aspects (Inferred):**
* **Responsible Agency:** The Ministry of Railways, specifically the South Central Railway, is the responsible agency. B RAMA KRISHNA, CPMGSUGTL is likely involved in the project.
* **Timelines and Procedures:** The policy is effective "from the date of publication of this notification in the Official Gazette," which is April 22, 2025. The notification initiates the land acquisition process under the Railways Act, 1989. However, specific timelines for project completion are not mentioned in the provided text.
**8. Expected Outcomes / Impact of Changes:**
The likely intended outcomes are:
* **Expedited Land Acquisition:** Faster acquisition of land required for the project due to the 'Special Railway Project' designation.
* **Reduced Accidents and Improved Safety:** Elimination of the level crossing will significantly reduce the risk of accidents for both rail and road traffic.
* **Reduced Traffic Congestion:** The road over bridge will alleviate traffic congestion caused by the level crossing.
* **Improved Transportation Efficiency:** The new infrastructure will improve the overall efficiency of transportation in the region.
**9. Conclusion:**
The notification designating the "Construction of Road Over Bridge In lieu of Level Crossing No. 216 at Km. 55512 in between Marichethal Raichur Stations" as a Special Railway Project is a significant step towards improving railway infrastructure, public safety, and transportation efficiency. The designation aims to expedite land acquisition, a critical step in completing the project. This policy highlights the government's commitment to developing national infrastructure and addressing safety concerns related to level crossings.
Key Entities Referenced
Railways Act, 1989: Act under which the Central Government is exercising powers.
Section 2: Section of the Railways Act, 1989 being referenced.
clause 37A: Clause of Section 2 of the Railways Act, 1989 being referenced.
Central Government: The governing body issuing the notification.
Construction of Road Over Bridge In lieu of Level Crossing No. 216 at Km. 55512 in between Marichethal Raichur Stations: The name of the Special Railway Project.
Special Railway Project: Designation of the project for land acquisition.
State of Karnataka: The state where the land acquisition will take place.
District of Raichur: The specific district in Karnataka for land acquisition.
National Infrastructure: Purpose for which land is being acquired.
Ministry of Railways: Government organization responsible for the notification.
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99
सी.जी.-टी.एल.-अ.-23042025-262625
CG-TLxx-xEG-I2D3H0x4x2x0 25-262625
xxxGIDExxx
असाधारण
EXTRAORDINARY
भाग II—खण् ड 3—उप-खण्ड (ii)
PART II—Section 3—Sub-section (ii)
प्राजधकार स ेप्रकाजित
PUBLISHED BY AUTHORITY
स.ं 1800] नई कदल्ली, मगं लवार, अप्रलै 22, 2025/विै ाख 2, 1947 946
No. 1800] NEW DELHI, TUESDAY, APRIL 22, 2025/VAISAKHA 2, 1947 3, 1946
रेल मत्रं ालय
(दजिण मध्य रेलवे)
अजधसचू ना
जसकंदराबाद, 22 अप्रैल, 2025
का.आ. 1833(अ).—केंद्र सरकार, रेलवे अजधजनयम, 1989 की धारा 2 के खंड (37 क) द्वारा प्रदत्त िजियों का
प्रयोग करते हुए, एतद ्द्वारा, "मरीचेथल - रायचूर स्ट्टेिनों के बीच ककमी 555/1-2 पर लेवल क्रॉससंग संख्या 216 के स्ट्थान
पर सड़क ऊपरी पलु का जनमाणा " को िन प्रयोिन हते ु राष्ट्रीय अवसंरचना प्रदान करने के जलए कनााटक राज्य के रायचरू
जिला म ें भूजम अजधग्रहण हते ु आजधकाररक रािपत्र म ें इस अजधसूचना के प्रकािन की तारीख से एक जविेष रेल पररयोिना
के रूप म ेंअजधसूजचत करती ह ै
[ फा. सं. Con/RSP/Gazette /LC. 216 /GY-WADI /GSU/GTL]
बी राम कृष्ण, सीपीएम / िीएसय ू / िीटीएल
2694 GI/2025 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
MINISTRY OF RAILWAYS
(South Central Railway)
NOTIFICATION
Secunderabad, the 22nd April, 2025
S.O. 1833(E).—In exercise of the powers conferred by clause (37A) of Section 2 of the Railways Act, 1989
the Central Government hereby notifies "Construction of Road Over Bridge In lieu of Level Crossing No. 216 at Km.
555/1-2 in between Marichethal - Raichur Stations" as a Special Railway Project for acquisition of land in the State of
Karnataka in the District of Raichur for providing National Infrastructure for a public purpose with effect from the
date of publication of this notification in the Official Gazette.
[F. No. W. Con/RSP/Gazette /LC. 216 /GY-WADI /GSU/GTL]
B RAMA KRISHNA, CPM/GSU/GTL
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.