Home India Ministry of Railways Construction of Road Over Bridge In lieu of Level Crossing N...
Date: 2025-04-22 Category: Extra Ordinary State: Union Government Country: India

Construction of Road Over Bridge In lieu of Level Crossing No217 at Km 558/6 7 in between Marichethal Raichur Stations as a Special Railway Project for acquisition of land in the State of Karnataka in the District of Raichur

Issued by Ministry of Railways · Construction Department

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

## Policy Analysis Report: South Central Railway - Road Over Bridge Construction (2025) **1. Executive Summary:** This report analyzes a notification issued by the Ministry of Railways, South Central Railway, regarding the construction of a Road Over Bridge in lieu of Level Crossing No. 217. The notification designates this project as a "Special Railway Project" for land acquisition purposes under the Railways Act of 1989. This designation facilitates the acquisition of land in the Raichur District of Karnataka to support the development of national infrastructure for public use. The key finding is that this notification expedites land acquisition for this specific project. **2. Introduction:** This report provides an overview and analysis of a policy notification published in the Gazette of India regarding a railway infrastructure project. The analysis is based solely on the text provided in the notification. The purpose is to inform affected industries about the policy's objectives, provisions, and potential impact. **3. Policy Overview:** * This is a new policy notification for a specific infrastructure project. * **Core Objective:** To designate the "Construction of Road Over Bridge In lieu of Level Crossing No. 217 at Km. 55867 in between Marichethal Raichur Stations" as a Special Railway Project. This classification facilitates land acquisition for the project. **4. Background and Rationale:** The policy addresses the need to replace a level crossing with a Road Over Bridge. The rationale is likely to improve safety and reduce traffic congestion. Replacing level crossings with overpasses enhances railway and road traffic flow, minimizing the risk of accidents and delays at railway crossings. The project contributes to broader national infrastructure development by improving transportation efficiency. **5. Key Provisions / Changes:** As a new policy, the key provision is the official designation of the specified railway construction project as a "Special Railway Project". This designation triggers specific provisions within the Railways Act of 1989 related to land acquisition. * The key action is designating the construction as a "Special Railway Project". * This designation, according to the notification, is specifically for the purpose of land acquisition in the Raichur District of Karnataka. * The notification also specifies the location: "Km. 55867 in between Marichethal Raichur Stations". **6. Target Audience and Stakeholders:** The primary target audience and stakeholders include: * **Construction companies:** Those potentially bidding for or involved in the construction of the Road Over Bridge. * **Landowners in the Raichur District of Karnataka:** Individuals or entities whose land may be subject to acquisition for the project. * **Residents of the Marichethal and Raichur area:** Who will benefit from improved transportation infrastructure. * **South Central Railway:** Responsible for overseeing the project. **7. Implementation Aspects (Inferred):** * **Responsible agency:** The Ministry of Railways, specifically the South Central Railway zone, is responsible for implementing the project. CPMGSUGTL B RAMA KRISHNA. is noted in the text. * **Timelines:** The notification takes effect from April 22, 2025, the date of publication in the Official Gazette. The notification starts the land acquisition process. * **Procedures:** The designation of the project as a "Special Railway Project" implies that land acquisition will follow the procedures outlined in the Railways Act of 1989 and related regulations. **8. Expected Outcomes / Impact of Changes:** The likely intended outcomes include: * Expedited land acquisition for the Road Over Bridge project due to its "Special Railway Project" designation. * Construction of the Road Over Bridge at Km. 55867 between Marichethal and Raichur stations. * Improved transportation infrastructure, reduced traffic congestion, and enhanced safety at the former level crossing. * Positive impact on regional connectivity and economic activity. **9. Conclusion:** The notification designates the construction of a Road Over Bridge as a "Special Railway Project," facilitating land acquisition and promoting infrastructure development. This designation signals the government's commitment to improving railway infrastructure and enhancing public safety and transportation efficiency in the Raichur District of Karnataka. The designation of “Special Railway Project” allows the project to proceed with land acquisition according to the Railways Act of 1989. The South Central Railway is responsible for overseeing the project implementation. This is a significant step towards modernizing railway infrastructure.

Key Entities Referenced

Railways Act, 1989: Act under which powers are conferred for the Special Railway Project. Section 2: Reference to a section within the Railways Act, 1989. clause 37A: Clause within Section 2 of the Railways Act, 1989. Ministry of Railways: Government organization responsible for the notification. Central Government: The governing body issuing the notification. S.O. 1834E: Notification number. Special Railway Project: Designation for the project involving the construction of a road over bridge. Construction of Road Over Bridge In lieu of Level Crossing No. 217 at Km. 55867 in between Marichethal Raichur Stations: Name of the Special Railway Project. National Infrastructure: Purpose for which the land acquisition is being done. Karnataka: State where the land acquisition is taking place. Raichur: District in Karnataka where land acquisition is taking place.
Official Source Record View Original Source →
See Full Document Text
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99 सी.जी.-टी.एल.-अ.-23042025-262626 CG-TLxx-xEG-I2D3H0x4x2x0 25-262626 xxxGIDExxx असाधारण EXTRAORDINARY भाग II—खण् ड 3—उप-खण्ड (ii) PART II—Section 3—Sub-section (ii) प्राजधकार स ेप्रकाजित PUBLISHED BY AUTHORITY स.ं 1801] नई कदल्ली, मगं लवार, अप्रलै 22, 2025/विै ाख 2, 1947 946 No. 1801] NEW DELHI, TUESDAY, APRIL 22, 2025/VAISAKHA 2, 1947 3, 1946 रेल मत्रं ालय (दजिण मध्य रेलवे) अजधसचू ना जसकंदराबाद, 22 अप्रैल, 2025 का.आ. 1834(अ).—केंद्र सरकार, रेलव े अजधजनयम, 1989 की धारा 2 के खंड (37 क) द्वारा प्रदत्त िजियों का प्रयोग करते हुए, एतद ् द्वारा, "मरीचेथल-रायचूर स्ट्टेिनों के बीच ककमी 558/6-7 पर लेवल क्रॉससंग संख्या 217 के स्ट्थान पर सड़क ऊपरी पुल का जनमााण" को िन प्रयोिन हते ु राष्ट्रीय अवसंरचना प्रदान करन े के जलए कनााटक राज्य के रायचूर जिला में भजू म अजधग्रहण हते ु आजधकाररक रािपत्र में इस अजधसूचना के प्रकािन की तारीख से एक जविेष रेल पररयोिना के रूप में अजधसजू चत करती है [ फा. सं. W. Con/RSP/Gazette /LC. 217 /GY-WADI /GSU/GTL] बी राम कृष्ण, सीपीएम / िीएसय ू / िीटीएल 2695 GI/2025 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] MINISTRY OF RAILWAYS (South Central Railway) NOTIFICATION Secunderabad, the 22nd April, 2025 S.O. 1834(E).—In exercise of the powers conferred by clause (37A) of Section 2 of the Railways Act, 1989 the Central Government hereby notifies "Construction of Road Over Bridge In lieu of Level Crossing No. 217 at Km. 558/6-7 in between Marichethal - Raichur Stations" as a Special Railway Project for acquisition of land in the State of Karnataka in the District of Raichur for providing National Infrastructure for a public purpose with effect from the date of publication of this notification in the Official Gazette. [F. No. W. Con/RSP/Gazette /LC. 217 /GY-WADI /GSU/GTL] B RAMA KRISHNA, CPM/GSU/GTL . Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.

Continue your research