## Report on Amendments to Land Acquisition Notifications for Deoband-Roorkee New Railway Line Project
**1. Executive Summary:**
This report analyzes two corrigenda issued by the Ministry of Railways concerning land acquisition for the Deoband-Roorkee New Line project. These are amendments to earlier notifications (S.O. 286 E and S.O. 287 E, both dtd. 29.12.2021) that specify revised land details for acquisition in Saharanpur district, Uttar Pradesh. The amendments primarily address errors or omissions in the initial land descriptions, providing corrected details for specific land plots in Deoband and Diwalheri Dunichandpur. The report highlights the specific changes, affected stakeholders, and likely intended outcome of ensuring accurate land acquisition for the railway project.
**2. Introduction:**
This report provides an analysis of two recent corrigenda published in the Gazette of India by the Ministry of Railways. The purpose of this report is to inform stakeholders, particularly those in the affected industry, about the amendments made to the original land acquisition notifications for the Deoband-Roorkee New Line project. The analysis is based solely on the provided policy text.
**3. Policy Overview:**
* This document consists of amendments to the original notifications:
* S.O. 286 E dtd. 29.12.2021
* S.O. 287 E dtd. 29.12.2021
* **Core Objective(s):** The core objective, inferred from the text, is to acquire land for the Deoband-Roorkee New Line railway project. The amendments specifically aim to rectify errors and provide accurate details about the land parcels to be acquired.
**4. Background and Rationale:**
The provided text suggests that the original land acquisition notifications contained errors or incomplete information regarding specific land plots. The rationale for these amendments is to correct these errors, ensuring that the land acquisition process proceeds based on accurate and updated land records. This is likely to prevent disputes and ensure fair compensation to landowners. The amendments replace the earlier brief description of land with correct details.
**5. Key Provisions / Changes:**
The key provisions of these amendments involve replacing incorrect or incomplete land details with corrected information.
**Amendment 1 (Regarding S.O. 286 E dtd. 29.12.2021):**
* **Specific Part Changed:** This amendment cancels the previous description of land to be acquired at Sl.No. 3 and 6 for village Deoband Baroon Hadood Distt. Saharanpur UP.
* **New Rule/Provision:** The amendment provides a corrected table of land details including:
* District: Saharanpur
* Tehsil: Deoband
* Village: Deoband Baroon Hadood
* Khata No: 2071, 227
* Khasra No: 8351, 8421, 8423, 620
* Type of land: Pvt (Private)
* Nature of Land: Agriculture, Plotting
* Area (in Hectares): 0.2045, 0.0151
* **Difference/Effect:** This change ensures the acquisition proceeds based on accurate land records, likely impacting compensation calculations and preventing potential legal challenges.
**Amendment 2 (Regarding S.O. 287 E dtd. 29.12.2021):**
* **Specific Part Changed:** This amendment cancels the previous description of land to be acquired at Sl.No. 5, 6, 7 and 12 for village Diwlalheri Dunichandpur Distt. Saharanpur UP.
* **New Rule/Provision:** The amendment provides a corrected table of land details including:
* District: Saharanpur
* Tehsil: Deoband
* Village: Diwalheri, Duni Nil Chandpur
* Khata No: 195, 247, 108, 2321
* Khasra No: 81, 196, 401, 550
* Type of land: Pvt (Private)
* Nature of Land: Agriculture
* Area (in Hectares): 0.050, 0.047, 0.0779, 0.0414
* **Difference/Effect:** This change ensures the acquisition proceeds based on accurate land records, likely impacting compensation calculations and preventing potential legal challenges.
**6. Target Audience and Stakeholders:**
The primary target audience and stakeholders are:
* Landowners in the villages of Deoband Baroon Hadood and Diwalheri Dunichandpur, Saharanpur district, Uttar Pradesh, whose land is being acquired for the railway project.
* The Ministry of Railways and its Construction Organization (Northern Railway).
* Any other parties involved in the land acquisition process, such as local government officials and legal representatives.
* Construction companies involved in the Deoband-Roorkee New Line project.
**7. Implementation Aspects (Inferred):**
* **Responsible Agency/Bodies:** The Ministry of Railways, specifically the Northern Railway Construction Organization, is responsible for implementing these amendments. A.K.SINGHAL, Chief Administrative Officer (Const.) is explicitly mentioned.
* **Timelines/Procedures:** The amendments are effective from the date of notification (April 1st, 2022). The implementation involves updating land acquisition records and potentially reassessing compensation based on the corrected land details. Further procedures would follow standard land acquisition protocols.
* The Gazette of India is the official publication channel.
**8. Expected Outcomes / Impact of Changes:**
The likely intended outcome of these amendments is:
* A more accurate and legally sound land acquisition process for the Deoband-Roorkee New Line project.
* Reduced potential for disputes and legal challenges related to land ownership and compensation.
* A smoother and more efficient implementation of the railway project.
**9. Conclusion:**
The corrigenda analyzed in this report represent important adjustments to the land acquisition notifications for the Deoband-Roorkee New Line project. By correcting errors in land descriptions, these amendments contribute to a more transparent, equitable, and legally defensible process, benefiting both the railway project and the affected landowners. These changes are significant because accurate land records are fundamental to fair compensation and the avoidance of costly delays and disputes.
Key Entities Referenced
Railway Act, 1989: A law cited as the legal basis for the notification.
Central Government: The governing authority issuing the notification.
Ministry of Railways: The government ministry responsible for the notification.
Northern Railway: Name of the railway zone
CONSTRUCTION ORGANIZATION: A department under the Northern Railway.
Deoband Baroon Hadood: Village in Saharanpur District, Uttar Pradesh where land acquisition is taking place for the Special Railway Project.
Saharanpur: District in Uttar Pradesh where the land acquisition is taking place.
Uttar Pradesh: State in India where the land acquisition is taking place.
Special Railway Project of DeobandRoorkee New Line: A railway project for which land is being acquired.
Deoband: Tehsil in Saharanpur district, Uttar Pradesh
Diwalheri Dunichandpur: Village in Saharanpur District, Uttar Pradesh where land acquisition is taking place for the Special Railway Project.
A.K.SINGHAL: Chief Administrative OfficerConst.
Government of India Press, Ring Road, Mayapuri, New Delhi: The location where document is uploaded.
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99
xxxGIDHxxx
सी.जी.-डी.एलxx.x-GअID.-E0x6xx0 52022-235588
CG-DL-E-06052022-235588
असाधारण
EXTRAORDINARY
भाग II—खण् ड 3—उप-खण्ड (ii)
PART II—Section 3—Sub-section (ii)
प्राजधकार स ेप्रकाजित
PUBLISHED BY AUTHORITY
स.ं 2000] नई दिल्ली, बृहस्ट्प जतवार, मई 5, 2022/विै ाख 15, 1944
No. 2000] NEW DELHI, THURSDAY, MAY 5, 2022/VAISAKHA 15, 1944
( )
िजु ि पत्र
नई दिल्ली, 1 अप्रैल, 2022
का.आ. 2101(अ).—
20A
k 29.12.2021,
II ii 20.01.2022
:—
29.12.201 :
िवे बंि बैरून हििू सहारनपुर उत्तर प्रििे
,
29.12.2021 िवे बंि बैरून हििू
िवे बंि बैरून हििू सहारनपुर उत्तर प्रििे
:
3088 GI/2022 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
जिला का नाम - सहारनपरु
खाता
नंबर
3 सहारनपुर िवे बंि िवे बंि 2071(अ) 835/1 futh d`f’k 0.2045
बैरून 842/1
हििू 842/3
[फा. सं. 101-W/91/W-Spl/Estt/Pt-IV/II]
ए. के. ससघल, मुख्य प्रिासजनक अजधकारी/जनमाणा
MINISTRY OF RAILWAYS
(Northern Railway)
(CONSTRUCTION ORGANIZATION)
CORRIGENDUM
New Delhi, the 1st April, 2022
S.O. 2101(E).—In exercise of the powers conferred by sub-section (1) of Section 20A of the Railway
Act,1989 (24 of 1989) (hereinafter referred to as the said Act), the Central Government, hereby makes following
amendments in the notification of the Government of India in the Ministry of Railways notification number S.O. 286
(E) dtd. 29.12.2021 published in the Gazette of India, Extraordinary, Part-II, Section-3, Sub-section dated on
20.01.2022 namely:-
For notification vide S.O. 286 (E) dtd. 29.12.2021: Earlier brief description of the land to be acquired, with
or without structures, for village (Deoband Baroon Hadood) Distt. Saharanpur (UP) falling within the proposed
Special Railway Project of Deoband-Roorkee (New Line) in District Saharanpur in the state of Uttar Pradesh Sl.No. 3
& 6 may be treated as cancelled and correct details may be read as under:
District: Saharanpur
Sr.No District Tehsil Village Khata Khasra Type Nature of Area
Name Name No. No of land in Hect
Land
1 2 3 4 5 6 7 8 9
3 Saharanpur Deoband Deoband 2071(अ) 835/1 Pvt Agriculture 0.2045
Baroon 842/1
Hadood 842/3
6 Saharanpur Deoband Deoband 227(अ) 620 Pvt Plotting 0.0151
Baroon
Hadood
[F. No. 101-W/91/W-Spl/Estt/Pt-IV/II]
A.K.SINGHAL, Chief Administrative Officer/Const.
िजु ि पत्र
नई दिल्ली, 1 अप्रैल, 2022
का.आ. 2102(अ).—dsna zh; ljdkj] jys vf/kfu;e] 1989 ¼1989 dk 24½ ¼ftls blesa blds i'pkr~ mDr
vf/kfu;e dgk x;k gS½ dh /kkjk 20A dh mi/kkjk ¼1½ }kjk iznRr 'kfDr;kas dk iz;ksx djr s gq, Hkkjr ljdkj ds
jys ea=ky; dh vf/klwpuk la[;k dk- vk- 287¼v½] rkjh[k 29.12.2021, tks Hkkjr ds jkti=] vlk/kkj.k] Hkkx&II]
[kMa 3] mi&[kMa ¼ii½ eas rkjh[k 20.01.2022 dk s çdkf'kr dh xbZ Fkh] es a fuEufyf[kr la'kks/ku djrh gS] vFkkZr :-[भाग II—खण् ड 3(ii)] भारत का रािपत्र : असाधारण 3
vf/klwpuk la[;k dk- vk- 287 ¼v½] rkjh[k 29.12.2021 ds lEcU/k es a : fo'k"sk jsy ifj;kts uk
nos can&:M+dh ubZ jsy ykbZu ds fu"iknu ds fy, Xkkao nhokygsMh ftyk सहारनपुर उत्तर प्रिेि jkT; esa vftZr dh
tku s okyh Hkwfe dk laf{kIr fooj.k, tk s fd jsy ea=ky; dh vf/klwpuk la[;k dk- vk- 287¼v½] rkjh[k 29.12.2021
dh vuqlwph ds Xkkao nhokygsMh ds Øekad la- 5] 6] एव ं 7 dks fujLr fd;k tkrk gS vkSj mä ifj;kts uk ds fy,
Xkkao nhokygMs h ftyk सहारनपुर उत्तर प्रिेि jkT; es a vftZr dh tku s okyh Hkwfe dk la'kkfs/kr dk laf{kIr fooj.k
¼vuqlwph ds Øekad la- 5] 6] एव ं7 ij½ fuEu i<k+ tk;s :
जिला का नाम – सहारनपुर
खाता नंबर अर्जित
5 सहारनपुर िेवबंि nhokygsMh 195( ख) futh d`f’k 0.050
81
196 ( ख)
6 सहारनपुर िेवबंि nhokygsMh 247 401 futh d`f’k 0.047
7 सहारनपुर िेवबंि nhokygsMh 108 550 futh d`f’k 0.0779
200
[फा. सं. 101-W/91/W-Spl/Estt/Pt-IV/II]
ए. के. ससघल, मुख्य प्रिासजनक अजधकारी/जनमाणा
CORRIGENDUM
New Delhi, the 1st April, 2022
S.O. 2102(E).—In exercise of the powers conferred by sub-section (1) of Section 20A of the Railway
Act,1989 (24 of 1989) (hereinafter referred to as the said Act), the Central Government, hereby makes following
amendments in the notification of the Government of India in the Ministry of Railways notification number S.O.
287 (E) dtd. 29.12.2021 published in the Gazette of India, Extraordinary, Part-II, Section-3, Sub-section dated on
20.01.2022 namely:-
For notification vide S.O. 287 (E) dtd. 29.12.2021: Earlier brief description of the land to be acquired, with
or without structures, for village Diwlalheri & Dunichandpur Distt. Saharanpur (UP) falling within the proposed
Special Railway Project of Deoband-Roorkee (New Line) in District Saharanpur in the state of Uttar Pradesh
Sl.No. 5, 6, 7&12 may be treated as cancelled and correct details may be read as under:
District: Saharanpur
Sr. District Tehsil Village Khata Khasra Type Nature of Area
No Name Name No. No of land in Hect
Land
1 2 3 4 5 6 7 8 9
5 Saharanpur Deoband Diwalheri 195( अ) Pvt Agriculture 0.050
81 196 ( अ)
6 Saharanpur Deoband Diwalheri 247 401 Pvt Agriculture 0.047
7 Saharanpur Deoband Diwalheri 108 550 Pvt Agriculture 0.0779
200
12 Saharanpur Deoband Duni Nil 232/1 Pvt Agriculture 0.0414
Chandpur
[F. No. 101-W/91/W-Spl/Estt/Pt-IV/II]
A.K.SINGHAL, Chief Administrative Officer/Const.
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.