DELAY/LATE ARRIVAL OF TRAINS
3916. SHRI SURESH KUMAR SHETKAR:
SHRI MANICKAM TAGORE B:
Will the Minister of RAILWAYS be pleased to state:
(a) whether the Government has identified railway routes and sections with
the highest frequency of train delays and if so, the details thereof and
the corrective measures taken thereon;
(b) whether any action has been taken by the Government against officials
responsible for avoidable delays in train operations and if so, the details
thereof and if not, the reasons therefor;
(c) whether the Government proposes to modernise railway infrastructure
to reduce delays in train operations and if so, the details thereof and
the timeline fixed for implementation;
(d) whether passengers are compensated for excessive delays in train
arrivals under any existing policy and if so, the details thereof and if
not, the reasons therefor; and
(e) whether the Government proposes to introduce new technologies,
including advanced signalling and traffic management systems to
improve train punctuality and if so, the details thereof and if not, the
reasons therefor?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (e) Punctuality is accorded high priority on Indian Railways (IR) and
all possible efforts are made to run trains on time. However, on Indian
Railways, several factors affect punctuality which include foggy weather,
Page 1 of 7
§path constraints, asset maintenance and other issues, alarm chain pulling,
agitations, cattle run over and other unforeseen circumstances.
The steps taken to improve punctuality of train services include:
Regular, continuous and real-time monitoring of punctuality of trains
using technological tools and IT systems.
Use of an integrated digital platform for monitoring of train operations
comprising Integrated Coaching Management System (ICMS) and Control
Office Application (COA) which are integrated with National Train
Enquiry System (NTES).
Progressive advancement for automatic uptake of timings by the train
movement itself, is being achieved through GPS devices fitted
locomotives {Real-Time Train Information System (RTIS) and Remote
Monitoring and Management of Locomotives and Trains (REMMLOT)} and
Data loggers integrated with the station signaling system.
IR has been replacing conventional coaches (ICF coaches) by modern
light weight LHB coaches having state-of-the art technology. The
Production units of Indian Railways are producing only LHB coaches
from April 2018 onwards. The production of LHB coaches has continually
increased during the years and about 50,000 LHB coaches have been
turned out since 2014. IR has also been proliferating Vande Bharat,
Namo Bharat Rapid Rail and Amrit Bharat trains, for quick acceleration
and deceleration.
To improve punctuality, IR also undertakes rationalisation of time tables.
One such exercise, in a scientific manner, was undertaken with the
assistance of IIT- Mumbai using their traffic simulator. The exercise also
aimed at provisioning of fixed Integrated Maintenance blocks on all
sections to minimise detention and improve punctuality.
New generation High capacity Locomotives are being utilised for Right
powering of trains.
Page 2 of 7 Further, with a view to minimise and mitigate the effect of fog and to
assist the Loco Pilots run the train during foggy weather conditions the
following steps have been taken by Indian Railways:
(i) GPS based FOG SAFE DEVICE – A Global Positioning System (GPS)
based portable 'Fog Safe Device' (FSD) is being provided to Loco Pilots,
which displays upcoming critical landmarks such as approaching signal,
level crossing gates, permanent speed restrictions etc. in advance
during poor visibility conditions like fog. This device is used for safe
train operation especially during winter season and to help reduce
stress on Loco Pilots while running in poor visibility conditions. As on
31.05.2026, there are 33,624 Fog Safe devices available over Indian
Railways.
(ii) Modified Semi-Automatic Stop Signal (MASS) System: MASS has
been introduced on the Automatic Signalling territory during abnormal
conditions like Fog & Bad Weather impairing visibility. The system helps
minimise delay in train operation during foggy weather conditions.
Train operation during fog and poor visibility conditions is an essential
component of the training curriculum and the same has already been
incorporated in the Transportation Module and Technical Module of the
prescribed training syllabus for Loco Pilots (LPs) and Assistant Loco Pilots
(ALPs).
Modernisation of Signalling infrastructure: Indian Railways is
modernising the signalling infrastructure for enhanced reliability &
safety. It is using reliable digital technology by provision of electronic
interlocking systems with adequate redundancy (in power supply &
transmission media), dual detection systems for train vehicle
verification and replacement of electromechanical installations. Several
improvement measures have been taken such as:
Page 3 of 7a. Provision of Electrical/Electronic Interlocking Systems with
centralized operation of points and signals in place of old mechanical
signalling. It has been provided at 6671 stations as on 30.06.2026.
b. Complete Track Circuiting of stations to enhance safety for
verification of track occupancy by electrical means has been provided at
6671 stations upto 30.06.2026.
c. Axle counters for automatic clearance of Block Section, BPAC (Block
Proving Axle Counter) are provided to ensure complete arrival of train
without manual intervention before granting line clear to receive next train
and to reduce human element. These systems have been provided on 6085
Block Sections up to 30.06.2026.
d. Signalling assets maintenance are planned & under taken during
Rolling Block introduced in Indian Railways (Open Lines) General Rules
vide Gazette notification dated 30.11.2023, wherein work of integrated
maintenance/repair/replacement of assets is planned in advance on rolling
basis and executed.
Capacity enhancement: Capacity enhancement of railway network has
been taken up by Indian Railways in a big way during the last 12 years.
The details of commissioning/laying of new track across Indian Railways
are given below:-
Period New track Commissioned Average commissioning of new tracks
2009-14 7,599 Km 4.2 Km/day
2014-26 36,429 Km 8.32 Km/day (nearly 2 times)
As on 01.04.2026, across Indian Railways, 514 Railway infrastructure
projects (169 New Line, 29 Gauge Conversion and 316 Doubling) of total
length 40,000 Km, costing approx. Rs. 8.31 lakh crore are sanctioned. The
summary is as under:-
Page 4 of 7Category No. of Total Length Total
Projects Length Commissioned till Expenditure
NL/GC/DL Mar'26 (Km) upto Mar'26
(km) (Rs. in Crore)
New lines 169 16,634 3,361 1,57,572
Gauge 29 3987 3,045 24,227
conversion
Doubling 316 19,379 6,177 1,23,454
TOTAL 514 40,000 12,583 3,05,253
Track Infrastructure:
Strengthening, upgradation, modernisation and improvement of track
infrastructure is a continuous and ongoing process over Indian Railways.
The following measures are being taken by Indian Railways to upgrade
railway tracks:
I. Modern track structure consisting of 60kg, 90 Ultimate Tensile
Strength (UTS) rails, Wider and heavier Pre-stressed Concrete Sleepers
(PSC) with elastic fastening, fan-shaped layout turnout on PSC sleepers and
H-beam Sleepers on girder bridges are being used while carrying out
primary track renewals.
II. The Thick Web Switches and Weldable CMS Crossings are being used
in turnout renewal works.
III. Supply of 260m long rail panels have been increased to avoid welding
of joints, thereby improving safety and riding quality.
IV. Thick Web Switch Expansion Joints are being used in place of earlier
Conventional/Improved SEJs.
V. Adoption of better welding technology for rails i.e. Flash Butt Welding.
VI. Adoption of mechanized system for track maintenance using high
output plain tampers and points & crossing tampers for improved
maintainability & reliability of track.
Page 5 of 7VII. Deployment of state-of-the-art modern machines including Rail
Grinding Machines to further improve asset reliability.
VIII. Mechanisation of track laying activities through use of track
machines like PQRS, TRT, T-28 etc.
IX. Interlocking of Level Crossing (LC) Gates for enhancing safety at LC
gates.
X. Use of advanced Phased Array technology of testing of rail and welds.
XI. Deployment of Integrated Track Monitoring Systems (ITMS) and
Oscillation Monitoring System (OMS) for comprehensive health assessment
to ascertain optimal maintenance requirements.
XII. Adoption of portable Track Measuring Trolley for continuous recording
of track parameters in yards.
XIII. Using web enabled Track Management System (TMS) for integration
and data analytics of the track inspection records received through various
sources to enable precise maintenance inputs.
As a result of the above measures, there has been significant increase in
speed potential of the tracks. The details of speed potential of railway
tracks during 2014 vis-a-vis 2026 are as under:
Sectional Speed 2014 2026
(kmph) Track Km % Track Km %
130 & above 5,036 6.3 24,173 22.5
110 - 130 26,409 33.3 62,482 58.1
< 110 47,897 60.4 20,897 19.4
Total 79,342 100 1,07,552 100
Results/Outcomes:
Due to these initiatives, Indian railways, during 2025-26 recorded an overall
punctuality of more than 77%.
Page 6 of 7No. of Zones Punctuality percentage
3 Punctuality of more than 90%
09 Punctuality between 75% and 90%
Full refund of fare is granted without deduction of cancellation or clerkage
charge to all passengers holding reserved, RAC and wait listed tickets, if
the journey is not undertaken due to late running of train by more than
three hours of the scheduled departure of the train from station
commencing journey, provided ticket is cancelled/ ticket deposit receipt
(TDR) is filed as the case may be as per Railway Passengers (Cancellation
of tickets and refund of fare) Rules 2015 within the prescribed time limit.
*****
Page 7 of 7