Home India Delhi Development Authority Development Authority proposes to make to the Master Plan fo...
Date: 2021-06-09 Category: Extra Ordinary State: Union Government Country: India

Development Authority proposes to make to the Master Plan for Delhi MPD keeping in view the perspective for the year 2041 as Master Plan for Delhi 2041

Issued by Delhi Development Authority · Master Plan Section

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

## Policy Analysis Report: Perspective Plan for Infrastructure Service for Delhi 2041 **1. Executive Summary:** This report analyzes the "Perspective Plan for Infrastructure Service for Delhi 2041," as published in The Gazette of India, focusing on water and wastewater management. The plan outlines strategies to meet the potable water demands of Delhi's projected population in 2041 by augmenting water resources and implementing water conservation initiatives. The document addresses both water supply and wastewater/sewerage management and details specific action plans including groundwater recharge, wastewater reuse, and the construction and upgradation of water and sewage treatment plants. The report highlights the responsible agencies, implementation timelines, and expected outcomes related to these plans, particularly for Delhi Jal Board (DJB) and related stakeholders. **2. Introduction:** This report provides an informative overview of the "Perspective Plan for Infrastructure Service for Delhi 2041," as detailed in the provided government policy text. The analysis focuses on the plan's provisions related to water supply and wastewater/sewerage management within the National Capital Territory (NCT) of Delhi. The report aims to clarify the core objectives, key changes, target audience, implementation aspects, and expected outcomes of this plan, based solely on the information contained within the provided document. **3. Policy Overview:** * **Core Objective(s):** Based on the provided text, the core objectives of the "Perspective Plan for Infrastructure Service for Delhi 2041" are: * To ensure an adequate and sustainable supply of potable water for Delhi's projected population of 30 million by 2041. * To reduce per capita potable water requirement through water conservation measures and the utilization of non-potable recycled water for various purposes. * To effectively manage and treat wastewater to minimize environmental impact and augment water resources. * To improve service levels for water and sewer connections and enhance revenue collection efficiency. **4. Background and Rationale:** As a New Policy, The policy addresses the increasing challenges associated with limited freshwater resources and growing water demand in the National Capital Territory of Delhi. The text highlights the rationalization of demand for potable water due to limited water resources. The Plan aims to provide enough water to account for the increased population. It also address the issue of treating waste water in accordance to the outlined standards and methods in the policy text. **5. Key Provisions / Changes:** **New Policy:** The policy establishes a multi-faceted plan for water and wastewater management, including the following key provisions: * **Water Augmentation:** * The plan focuses on a twin-pronged strategy that emphasizes augmentation of both groundwater and surface water resources. * Groundwater augmentation includes installation of additional tube wells, aquifer recharge, and extraction from water bodies. * Surface water augmentation focuses on utilizing Delhi's share of Yamuna water, securing additional river water from Uttar Pradesh, and developing upstream storage projects. * **Water Conservation:** * The plan mandates the use of non-potable recycled water for toilet flushing, industrial processes, horticulture, gardening, and agriculture. * It encourages rooftop rainwater harvesting and the revival/rejuvenation of existing water bodies. * **Wastewater Management:** * The plan proposes a sewerage disposal plan for 2041, encompassing the laying of sewerage systems in unsewered areas, rehabilitation and upgradation of existing STPs, and the construction of new and decentralized STPs. * The plan recommends upgrades to existing STPs to higher parameters (BOD:TSS 10:10). * **Infrastructure Development:** * The plan mandates the provision of land for water supply infrastructure, including water treatment plants (WTPs) and underground reservoirs (UGRs) with booster pumping stations (BPS). * **Service Level Improvements:** * The plan outlines steps to improve the sanctioning of water and sewer connections, increase billing and revenue collection efficiency, and ensure equitable distribution of water. **6. Target Audience and Stakeholders:** Based on the provided text, the following are the key target audiences and stakeholders: * **Delhi Jal Board (DJB):** As the primary implementing agency, the DJB is directly responsible for executing the plans related to water augmentation, conservation, wastewater management, and infrastructure development. * **Delhi Development Authority (DDA):** The DDA is responsible for earmarking and providing land for water supply and wastewater treatment infrastructure. * **Land Developing Agencies:** These agencies are responsible for ensuring the availability of recycled water infrastructure (dual piping, plumbing) in new developments. * **Building Plan Sanctioning Authorities:** These authorities are responsible for enforcing dual piping in new buildings. * **Residents of Delhi:** The ultimate beneficiaries of the plan, who are expected to receive a reliable and sustainable supply of potable water. * **Uttar Pradesh & Haryana Governments:** In relation to river water and land exchange **7. Implementation Aspects (Inferred):** * **Responsible Agency/Bodies:** Delhi Jal Board (DJB) is the primary agency. The DDA, land developing agencies, building plan sanctioning authorities, and the Central Ground Water Board also have roles in implementation. * **Timelines:** The plan sets targets for 2026, 2031, 2036, and 2041, with specific timelines mentioned for individual projects, such as the construction and upgradation of STPs. * **Procedures:** * The plan specifies procedures for groundwater recharge, rainwater harvesting, and wastewater treatment. * It also outlines the process for setting up new WTPs and UGRs, including land acquisition and infrastructure development. **8. Expected Outcomes / Impact of Changes:** The likely intended outcomes of the "Perspective Plan for Infrastructure Service for Delhi 2041" are: * Increased availability of potable water to meet the growing demand. * Reduced reliance on freshwater resources through water conservation measures. * Improved water quality and reduced environmental pollution through effective wastewater treatment. * Enhanced service levels for water and sewer connections. * Sustainable water management practices that ensure the long-term availability of water resources for Delhi. **9. Conclusion:** The "Perspective Plan for Infrastructure Service for Delhi 2041" provides a comprehensive framework for addressing the challenges of water supply and wastewater management in Delhi. The plan emphasizes a multi-faceted approach that includes water augmentation, conservation, wastewater treatment, and infrastructure development. Successful implementation of the plan will require coordinated efforts from various agencies and stakeholders, including the Delhi Jal Board, the Delhi Development Authority, land developing agencies, and the residents of Delhi. The effective execution of this plan is critical for ensuring the long-term sustainability of water resources and the well-being of Delhi's growing population.

Key Entities Referenced

NEW DELHI: Place of Publication THE GAZETTE OF INDIA: Official publication of the Government of India MPD2041: A policy document regarding the Master Plan of Delhi River Yamuna: A river flowing through Delhi Wazirabad: Location on the River Yamuna, possibly related to a barrage or water source UYRB: Yamuna river Board, an organisation involved in Yamuna water distribution Himachal Pradesh: A state bordering Delhi, with an MOU regarding water allocation from the Yamuna River Hathnikund: A location related to Yamuna water allocation Tajewala: A location related to Yamuna water allocation Uttar Pradesh: A state bordering Delhi, involved in a water exchange agreement. Renukaji: Upstream Storages of River Yamuna Lakhwar: Upstream Storages of River Yamuna Kishau dam: Upstream Storages of River Yamuna DDA: Delhi Development Authority, responsible for land allocation. JICA: Japan International Cooperation Agency, an organization that conducted a study on water supply improvement in Delhi. Iradat, Delhi: Location for a new Water Treatment Plant Dwarka Phase II, Delhi: Location for a new Water Treatment Plant Najafgarh, Delhi: Location for a new Water Treatment Plant Chattarpur, Delhi: Location for a new Water Treatment Plant Central Ground Water Board: An organization that assessed rainwater runoff potential in Delhi PWDDMCsGoI: Public Works Department, Municipal Corporations of Delhi, Government of India PappanKalan Waste Water Treatment Plant WWTP: Location of artificial lake. Dwarka WTP, Delhi: Location of artificial lake. Timarpur Oxidation Pond, Delhi: Location of artificial lake. Rohini WWTP, Delhi: Location of artificial lake. Nilothi WWTP, Delhi: Location of artificial lake. MS CSIRNEERI: PMC IFCD: The surrounding of Water Bodies received from Irrigation and Flood Control Department, Proposed to be carried out through inhouse technology on DBO basis WAPCOS India Limited: A Government of India Undertaking, has submitted its report with identified proposed Recharge SchemesProjects in NCT of Delhi Chandrawal: Related to WTP Revamping RMS: Revenue Management System SMP 2031: Sewerage Master Plan NMCG: Funding from National Mission for Clean Ganga YAPIII: Funding from Yamuna Action Plan III AMRUT: Funding from Atal Mission for Rejuvenation and Urban Transformation PAC: Poly Aluminum Chloride Jaunti Regulator: Haryana in Exchange for irrigation use in NCT of Delhi UP: Exchange of raw water in lieu of Treated Effluent with Uttar Pradesh Okhla STP: Exchange of raw water in lieu of Treated Effluent from Okhla STP UP Govt: Pursued With Uttar Pradesh Goverment PPCL: Committed use by Power generation company at Rithala & Bawana Bawana plant: Committed use by Power generation company PPCL at Bawana plant UGRsMBRs: Underground Reservoirs Master Balancing Reservoirs BPS: Booster Pumping Stations DJB: Delhi Jal Board Delhi: National Capital Territory of Delhi Haryana: A state near Delhi, involved in Water exchange Delhi Jal Board: Delhi government agency for water. Rithala: Treatment plant location Kondli: Treatment plant location Delhi Gate: Treatment plant location Outer South Delhi: Delhi drainage zone Ghitorni: Delhi drainage zone Vasundhara enclave: Residential society in Delhi Narela: Delhi drainage zone Najafgarh: Delhi drainage zone Dr. Sen Nursing Home Nalla: Treatment plant location
Official Source Record View Original Source →
See Full Document Text
[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 1 रजजस्ट्री‍ु.ं‍डी.एल.-‍33004/99 REGD. No. D. L.-33004/99 xxxGIDHxxx सी.जी.-डी.एल.-अ.-09062021-227424 xxxGIDExxx CG-DL-E-09062021-227424 ऄुाधारण‍ EXTRAORDINARY भाग‍II—खण्ड‍‍3—ईप-खण्ड‍‍(ii)‍ PART II—Section 3—Sub-section (ii) प्राजधकार ु ेप्रकाजित PUBLISHED BY AUTHORITY ु.ं 2029] नइ‍ददल्ली, ‍बधु ाार, जनू ‍9, 2021/ज्य‍ ष्े ठ‍‍19, 1943 No. 2029] NEW DELHI, WEDNESDAY, JUNE 9, 2021/JYAISHTHA 19, 1943 ददल्ल‍ ी‍जाकाु‍प्राजधकरण‍ (मख्ु य‍ ‍यजजना‍ऄनभु ाग) ुााजव जनक‍ुचू ना नइ‍ददल्‍ली, 9 जून, 2021 का.अ. 2189(ऄ).—केंद्र‍ुरकार/ददल्‍ली‍जाकाु‍प्राजधकरण‍का‍ददल्ली‍जाकाु‍ऄजधजनयम‍1957‍की‍धारा‍11‍क‍ के‍ऄंतगवत‍ाीव‍2041‍के‍पररदश्ृ ‍य‍कज‍्यान‍में‍रखते‍ुएए,‍ददल्ल‍ ी‍मुख्य‍यजजना-2041‍(दद.म.ुयज.-2041)‍के‍रूप‍म‍ें ददल्ली‍ मुख्य‍यजजना‍(दद.मु.यज.)‍म‍ें जनम्‍नजलजखत‍्ापक‍ुंिजधन‍करने‍का‍प्रस्ट्ताा‍ू,,‍जजुे‍जनता‍की‍जानकारी‍के‍जलए‍एतद्द्वारा‍ प्रकाजित‍दकया‍जाता‍ू।, ड्राफ्ट‍दद.म.ुयज.-2041‍के‍ुंबंध‍म‍ें यदद‍दकुी‍व्‍यजि ‍कज‍कजइ‍अपजि‍ूज/ुुझाा‍देना‍ूज, तज‍ा‍े ऄपनी‍ अपजि/ुुझाा‍ आु‍ ुचू ना‍ के‍ जारी‍ ूजन‍े की‍ जतजथ‍ ु‍े पतैं ालीु‍ (45)‍ ददन‍ की‍ ऄाजध‍ के‍ ऄंदर‍ ाेबपजटवलः‍ http://online.dda.org.in/MPD2041‍द्वारा‍भेज‍ुकते‍ू‍ैं ऄथाा‍अयुक्त‍ ‍एां‍ुजचा,‍ददल्‍ली‍जाकाु‍प्राजधकरण,‍बी- ब्‍लॉक‍,‍जाकाु‍ुदन,‍नइ‍ददल्ल‍ ी-110023‍कज‍जलजखत‍रूप‍में‍भेज‍ुकते‍ू।ैं ‍अपजि‍करन‍े ऄथाा‍ुुझाा‍दने े‍ााल‍े व्‍यजि ‍ ऄपना‍नाम, पता‍और‍टेलीफजन‍नंबर/ुंपकव‍नंबर/इ-मेल‍अइ‍डी‍भी‍जलख,ें जज‍पठनीय‍ूज। ददल्ली‍मख्ु य‍यजजना-2041‍के‍बारे‍म ें ददल्ली‍मुख्य‍यजजना‍(एमपीडी)‍एक‍ऐुा‍मूत्ापूण‍व दस्ट्तााेज‍ू‍, जजुमें‍ातवमान‍जस्ट्थजत‍का‍अकलन‍करके‍और‍यू‍ददिा- जनदेजित‍करत‍े ुएए‍दक‍ाांजछत‍जाकाु‍क,ुे‍प्राप्त‍करें, ददल्ली‍का‍जाकाु‍करने‍के‍बारे‍म‍ें बताया‍गया‍ू।, ‍आु‍ ‍ (मास्ट्टर‍यजजना)‍के‍जलए‍मुख्य‍एजेंुी‍ददल्ली‍जाकाु‍प्राजधकरण‍ू।, ‍यजजना‍का‍कायावन्ायन‍ुुजनजित‍करना‍ददल्ली‍के‍ जाकाु‍ुे‍जुड़ी‍ुभी‍एजेंजुयों‍की‍ुामूजूक‍जजम्मेदारी‍ू,, जजुमें‍केंद्र‍ुरकार, राष्ट्रीय‍राजधानी‍राज्यक्षेत्र‍ददल्ली‍ुरकार‍ के‍ुंबंजधत‍जाभाग, ुेाा‍प्रदाता, भूस्ट्ाामी‍एजेंजुयां, जाजनयामक‍और‍ऄन्य‍स्ट्थानीय‍जनकाय‍आत्यादद‍िाजमल‍ू।ैं 3050 GI/2021 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ददल्ली‍की‍ ‍(मास्ट्टर‍यजजना)‍कज‍ददल्ली‍जाकाु‍ऄजधजनयम,‍1957‍के‍तूत‍1962‍में‍प्रख्याजपत‍दकया‍ गया‍था।‍आुके‍बाद‍मास्ट्टर‍यजजना‍2001‍और‍2021‍बनाए‍गए‍थ,े जजनमें‍ुे‍प्रत्येक‍यजजना‍‍ुंबंजधत‍जपछल‍े यजजना- दस्ट्तााेज‍के‍्ापक‍ुंिजधन‍के‍रूप‍में‍ू।, ‍य‍े यजजना‍20‍ाीों‍की‍भााी‍ऄाजधयों‍के‍जलए‍तय, ार‍दकए‍गए‍थ‍े और‍आन्ूोंन‍े ददल्ली‍के‍जनयजजजत‍जाकाु‍के‍जलए‍एक‍ुमग्र‍फ्रेमाकव‍प्रदान‍दकया। ददल्ली‍मख्ु य‍यजजना-2041 एक‍‘कायवनीजतक’‍और‍‘ुमथवकारी’‍फ्रेमाकव‍ू‍, जज‍जपछले‍प्लानों‍के‍कायावन्ायन‍ुे‍जलए‍गए‍ ुबक‍के‍अधार‍पर‍िूर‍के‍भााी‍जाकाु‍कज‍जनदेजित‍करन‍ेके‍जलए‍बनाया‍गया‍ू।, ‍ ददल्ली‍मख्ु य‍यजजना‍2041‍दस्ट्तााज़े ‍की‍ुरं चना यजजना‍दस्ट्तााेज़‍कज‍आु‍प्रकार‍बनाया‍गया‍ू‍, दक‍ईुे‍जाजभन्न‍जन-प्रचार‍मा्यमों‍‍ुे‍ुाावजजनक‍डजमेन‍म‍ें ुाझा‍दकया‍ जा‍ुकता‍ू‍,और‍दस्ट्तााेज़‍में‍जजड़ने‍या‍ुंिजजधत‍करने‍की‍स्ट्ातन्त्रता‍प्रदान‍की‍गइ‍ू।, ‍प्रत्यके ‍ऄ्याय‍के‍जलए‍दस्ट्तााेज‍के‍ ुामने‍ुुलभ‍ुंदभ‍व के‍जलए‍एक‍कजड‍ददया‍गया‍ूः, ‍ईदाूरण‍के‍जलए‍एचुीपी-1‍‘ुाावजजनक‍स्ट्थलों‍का‍बेूतर‍प्रबंधन’ नामक‍िीीवक‍के‍ऄ्याय‍का‍ुूचक‍ू।, ‍यजजना‍में‍नीचे‍ददए‍गए‍ऄनुुार‍दज‍खडं ‍िाजमल‍ू:ैं ‐ ाॉल्यमू ‍1: जाज़न‍2041 और‍ुमथकव ारी‍नीजतगत‍फ्रेमाकव‍म‍ें ातवमान‍ुमय‍में‍ददल्ली,‍आुकी‍ा,जिक‍और‍क्षेत्रीय‍ जस्ट्थजत, ाीव‍2041 के‍जलए‍जनुंख्या‍के‍पूाावनुमान‍और‍ऄन्य‍जाजभन्न‍ऄनुमानों‍का‍बृूद-ऄालजकन करने‍ााला‍एक‍ पररचय‍िाजमल‍ू।, ‍आु‍खंड‍में‍ददल्ली‍मुख्य‍यजजना‍(एमपीडी)‍-2041 के‍जाज़न, लक्ष्य‍और‍ईद्देश्य‍ददए‍गए‍ू।ैं ‍आुके‍ ऄलााा, आु‍खंड‍म‍ें छू‍भाग‍ू‍ैं जजनम‍ें पयावारण, ऄथव्ास्ट्था‍(्ापार‍और‍ााजणज्य‍थजक‍्ापार, ईद्यजग‍और‍ ुरकारी‍कायावलय‍िाजमल‍ू)ैं , परराून‍और‍गजतिीलता, धरजूर, ुंस्ट्कृजत‍और‍ुाावजजनक‍स्ट्थलों, अश्रय‍और‍ ुामाजजक‍ढांचे‍और‍भौजतक‍ऄाुंरचना‍की‍मुख्य‍नीजतयााँ‍िाजमल‍की‍गइ‍ू।ैं ‐ ाॉल्यमू ‍2:‍स्ट्थाजनक‍जाकाु‍कायनव ीजत‍और‍काय‍व यजजना‍तीन‍भागों‍म‍ें जाभाजजत‍ू।, ‍पूले‍भाग‍म‍ें ुभी‍प्रमुख‍ कायवनीजतयााँ‍और‍जास्ट्तृत‍प्रााधान, ददल्ली‍के‍भााी‍‍स्ट्थाजनक‍जाकाु‍कज‍जनदेजित‍करन‍े के‍जलए‍जाजिष्ट‍मानदंड‍ू‍ैं जज‍िूर‍में‍ग्रीन‍फील्ड‍और‍ब्राईन‍फील्ड‍जाकाु-कायव‍(लडैं ‍पूललग‍एररया, ूररत‍जाकाु‍क्षेत्र, जनयजजजत‍और‍ ऄजनयजजजत‍क्षेत्रों‍के‍पुनःुुधार, पारगमन-ईन्मुख‍जाकाु, कायवनीजतक‍ईत्थान‍अदद)‍दजनों‍कज‍कार‍करत‍े ू।ैं ‐ दुू रे‍भाग‍में‍मास्ट्टर‍यजजना‍के‍जलए‍यजजना-जनगरानी‍और‍मल्ू यांकन‍फ्रेमाकव‍का‍प्रााधान‍ू‍,जजुमें‍अाजधक‍ुमीक्षा‍ करने‍और‍त्रुरट-ुुधार‍की‍ुुजाधा‍देने‍के‍जलए‍कायावन्ायन‍ढांचे‍की‍्ास्ट्था‍ुजूत‍प्रगजत‍की‍जनगरानी‍करने‍के‍जलए‍ प्रमुख‍जनष्पादन‍ुंकेतक‍तय‍दकए‍गए‍ू।ैं ‍तीुरे‍भाग‍में‍जाजभन्न‍प्रकार‍के‍जाकाु-कायव‍के‍जलए‍जास्ट्तृत‍जाकाु‍ जनयंत्रण‍मानदडं ‍और‍िूरी‍जडजाआन‍ददिाजनदेि‍िाजमल‍ू।ैं नजट:‍कजइ‍भी‍नया‍जाकाु‍/‍पररयजजना‍/‍पनुर्ननमावण‍/‍परराधवन‍‍/‍पररातवन‍अदद‍जज‍एमपीडी-2041 की‍ऄजधुूचना‍के‍ बाद‍ुामने‍अते‍ू,ैं आु‍की‍नीजतयों‍और‍मानदंडों‍का‍पालन‍करेंगे।‍ऄजधुूचना‍के‍ुमय‍चल‍रूी‍दकुी‍भी‍पररयजजना‍ (जनमावणाधीन)‍कज‍जपछले‍यजजना‍ऄथावत‍एमपीडी-2021‍के‍मानदंडों‍के‍ऄनुुार‍जनर्नमत‍करन‍ेकी‍ऄनुमजत‍दी‍जाएगी।‍ जजन‍पररयजजनाओं‍का‍‍‍जनमाणव ‍ऄभी‍िुरू‍नूीं‍ुएअ‍ू,,‍ाे‍लागू‍मास्ट्टर‍यजजना‍के‍ऄनुुार‍ऄपनी‍यजजनाओं‍कज‍ुंिजजधत‍ करेंग ेऔर‍आुके‍जलए‍अाश्यक‍ुमय‍ददया‍जाएगा। नजटः जनम्नजलजखत‍पजब्लक‍डजमेन‍में‍ू‍ैंऔर‍ुाावजजनक‍अपजियााँ‍और‍ुुझाा‍अमंजत्रत‍दकए‍गए‍ू।ैं‍आनमें‍बाद‍म‍ेंकजइ‍ुंिजधन‍ ूजने‍पर‍मु.दद.यज.-2041‍म‍ेंईपयुि ‍ढंग‍ु‍ेिाजमल‍कर‍जलया‍जाएगा। - ूररत‍जाकाु‍क्षेत्र‍के‍जलए‍नीजत - ऄनजधकृत‍कॉलजजनयों‍के‍जलए‍मानदण्ड - बुएस्ट्तरीय‍कार‍पार्ककग‍के‍जलए‍मानदण्ड[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 3 जाीय-ुचू ी ाॉल्यमू ‍1 - पररचय 1. ददल्ली‍जाजन‍2041‍( V1) खडं ‍1:‍पयााव रण 2. प्रदीू ण‍और‍जलाायु‍पररातनव ‍का‍ुमाधान‍ढूढ़ना (ENV1) 3. ग्रीन-ब्ल‍ूआंफ्रास्ट्रक्चर‍कज‍बढ़ाना (ENV2) खडं ‍2:‍ऄथ्व ास्ट्था 4. अर्नथक‍ईत्पादन‍के‍स्ट्थान (ECO) खडं ‍3:‍धरजूर, ुस्ट्ं कृजत‍और‍ुााजव जनक‍स्ट्थल 5. ुाावजजनक‍स्ट्थलों‍का‍बेूतर‍प्रबंधन‍करना (HCP1) 6. ददल्ली‍की‍धरजूर‍का‍प्रबंधन (HCP2) खडं ‍4:‍अश्रय‍और‍ुामाजजक‍ऄाुरं चना 7. अश्रय‍के‍जलए‍कायव‍नीजत‍बनाना (SSI1) 8. ुामाजजक‍ऄाुंरचना का‍प्रााधान (SSI2) ‍‍‍‍‍ खडं ‍5:‍परराून‍और‍गजतिीलता ‍‍‍‍‍ 9.‍ कनेजक्टजाटी‍और‍परराून‍ऄाुंरचना‍में‍ुुधार (MOB1) 10.‍ ुाझा‍गजतिीलता‍की‍ददिा‍म‍ेंस्ट्थानांतरण (MOB2) ‍‍‍ 11.‍ ददल्ली‍कज‍प,दल‍चलन‍े और‍ुाआदकल‍चलाने‍के‍ऄनुकूल‍बनाना (MOB3) 12.‍ ददल्ली‍म‍ेंपार्ककग‍प्रबंधन (MOB4) ‍‍‍‍‍ खडं ‍6:‍भौजतक‍ऄाुरं चना ‍‍‍‍‍ 13. ददल्ली‍कज‍जल‍ुुरजक्षत‍बनाना:‍जल, ऄपजिष्ट‍जल‍और‍जल‍जनकाुी (INF1) 14.‍ ठजु‍ऄपजिष्ट‍का‍कुिलतापूावक‍प्रबंधन (INF2) 15.‍ जाद्युत, ग,ु, दरू ुंचार‍और‍जडजजटल‍ऄाुंरचना‍(आंफ्रास्ट्रक्चर)‍ का‍प्रााधान (INF3) ‍ 16.‍ अपदा‍की‍त,यारी‍एां‍प्रजतरजधकता (INF4) ‍‍‍‍ 34 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ाॉल्यमू ‍2‍स्ट्थाजनक‍जाकाु‍और‍यजजना‍जनगरानी‍ूते ‍ुफ्रेमाकव खडं ‍7:‍स्ट्थाजनक‍जाकाु‍फ्रेमाकव 17. लैंड‍पूललग‍के‍मा्यम‍ुे‍नए‍क्षत्रे ों‍का‍जाकाु (DEV1) 18. ूररत‍जाकाु‍क्षेत्र‍में‍जाकाु (DEV2) 19. िूरी‍पुनरूद्धार (DEV3) 20. पारगमन‍ईन्मुख‍जाकाु (DEV4) खडं ‍8:‍यजजना‍की‍जनगरानी‍और‍मल्ू याकं न 21. जनगरानी‍फ्रेमाकव (PME) खडं ‍9:‍जाकाु‍कजड‍और‍जाकाु‍जनयत्रं ण‍मानदडं 22. जाकाु‍जनयंत्रण‍मानदंड (DCN) ुजं क्षजप्तयों‍की‍ुचू ी िब्दााली ऄनलु ग्नक ** लूदी‍ऄनुााद‍म‍ेंदकुी‍प्रकार‍की‍जाुंगजत‍पाए‍जान‍े पर‍मलू ‍ऄंग्रेजी‍पाठ‍मान्य‍ूजगा‍।‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 5 ाॉल्यमू ‍1 जाज़न‍2041 और नीजत‍फ्रेमाकव‍कज‍ुक्षम‍बनाना पररचय ददल्ली‍मख्ु य‍यजजना‍- 2041‍भारत‍की‍स्ट्ातन्त्रता‍के‍75ा‍ें ाीव‍के‍ुमय‍म‍ेंूी‍जारी‍दकया‍गया‍ू।, ‍भारत‍2050‍तक‍दजु नया‍ की‍तीुरी‍ुबुे‍बड़ी‍ऄथव्ास्ट्था‍बनने‍की‍ओर‍ऄग्रुर‍ू‍, और‍आुका‍जाकाु-पथ‍ऄजधकाजधक‍ईन‍िूरों‍द्वारा‍ पररभाजीत‍दकया‍जा‍रूा‍ू‍, जजनका‍ुकल‍घरेलू‍ईत्पाद‍म‍ें 60‍प्रजतित‍का‍यजगदान‍ू।, ‍ुरकार‍ने‍2014‍में‍यजजनाबद्ध‍ िूरी‍जाकाु‍के‍जलए‍एक‍्ापक‍कायवक्रम‍िुरू‍करके‍िूरी‍जाकाु‍पर‍्यान‍केंदद्रत‍दकया‍ू,, जजुे‍ुमााेिी, भागीदारी‍ और‍ुंपजीणीय‍दजृष्टकजण‍ऄपनाकर‍लजगों‍के‍जीान‍में‍क्रांजतकारी‍बदलाा‍लान‍े के‍जलए‍त,यार‍दकया‍गया‍ू।, अााुन‍और‍िूरी‍कायव‍मंत्रालय‍(एमओएचयूए) द्वारा‍कइ‍राष्ट्रीय‍िूरी‍जमिन‍िुरू‍दकए‍गए‍ू।ैं ‍फजकु‍क्षेत्र‍म‍ें भारतीय‍ िूरों‍में‍ुभी‍िूरी‍मुद्दों‍कज‍कार‍दकया‍गया‍ू‍ैं ज,ुे‍अााु, िूरी‍ुेााए,ं पयावारण‍और‍जलाायु‍पररातवन, स्ट्माट‍व जाकाु, गजतिीलता, कचरा‍प्रबंधन, धरजूर, जडजजटल‍ुक्षमता,‍और‍‍ऄन्य‍बातों‍के‍ुाथ‍ुाथ‍जल‍ुुरक्षा‍आत्यादद।‍आुके‍ ऄजतररि , भारत‍ुरकार‍कइ‍मानक, मानदंड, मॉडल‍नीजतयां‍और‍रूपरेखाए‍ं लाइ‍ू,, जजन्ू‍ें िूरों‍द्वारा‍जाजभन्न‍क्षेत्रों‍म‍ें ईनकी‍जस्ट्थजत‍का‍अकलन‍और‍जनगरानी‍करने‍के‍जलए‍ऄपनाया‍और‍ुंदर्नभत‍दकया‍जा‍ुकता‍ू,, ज,ुे‍दक, इज‍ऑफ‍ जललाग‍आंडेक्ु’‍ऄथाा‍'क्लाआमेट‍स्ट्माट‍व जुटीज़‍ऄुेुमेंट‍फ्रेमाकव'।‍िूरी‍पनु ःुुधार‍पर,‍जािेी‍रूप‍ु‍े ऄजनयजजजत‍और‍ ऄुुरजक्षत‍क्षेत्रों‍के‍पनु ःुुधार‍तथा‍लजगों‍के‍स्ट्ाास्ट््य‍और‍अजीजाका‍पर‍जािेी‍जजर‍ददया‍गया‍ू।, ‍ ददल्ली‍ूमेिा‍ुे भारत‍म‍ें प्रदिनव -यजग्य‍िूर‍रूी‍ू‍, जजुने‍दिे ‍भर‍के‍कस्ट्बों‍और‍िूरों‍म‍ें नीजतयों‍और‍पररयजजनाओं‍कज‍ प्रेररत‍दकया‍ू।, ‍एमपीडी-2041‍पूणवतः‍राष्ट्रीय‍स्ट्तर‍की‍िूरी‍नीजतयों‍के‍ऄनुरूप‍ू ,और‍अन‍े ााले‍ाीों‍में‍िूरी‍अधाररक‍ ुंरचना‍त,यार‍करन‍े में‍एक‍प्रमखु ‍भूजमका‍जनभाएगा।‍ददल्ली‍नए‍जाचारों‍की‍क्यारी‍ू‍, और‍यू‍िूर‍जाकाु‍का‍केंद्र‍बना‍ रूगे ा‍और 'नए‍िूरी‍भारत' का‍चेूरा‍ूजगा।‍आु‍यजजना‍की‍कायनव ीजतयााँ‍जाजभन्न‍पररयजजनाओं‍और‍यजजनाओं‍के‍ कायावन्ायन‍के‍ुंबंध‍में‍देि‍भर‍ुे‍जलए‍गए‍ऄनुभाों‍पर‍अधाररत‍ू।ैं ददल्ली‍की‍ाज, िक‍और‍क्षत्रे ीय‍जस्ट्थजत: ददल्ली‍जाि‍स्ट्तर‍पर‍एक‍प्रजतस्ट्पधी, फलता-फूलता‍िूरी‍केंद्र‍ूजने‍के‍ुाथ-ुाथ‍ दजु नया‍का‍एक‍ऐुा‍ऐजतूाजुक‍िूर‍ू,‍जजुकी‍ऄजद्वतीय‍ुांस्ट्कृजतक‍ुंपदा‍ू।, ‍भारत‍की‍राजधानी‍के‍रूप‍में, यू‍राष्ट्रीय‍ ुरकार‍का‍केन्द्र‍ू‍,और‍आुके‍ुाथ‍ूी‍ुंघ‍राज्यक्षेत्र‍के‍रूप‍में‍कायव‍करता‍ू‍,जजुमें‍राष्ट्रीय‍राजधानी‍राज्यक्षेत्र‍(एनुीटी)‍ के‍रूप‍में‍आुे‍एक‍जािेी‍दजाव‍भी‍ददया‍गया‍ू।, ‍राष्ट्रीय‍राजधानी‍राज्यक्षेत्र‍ददल्ली‍में‍कइ‍स्ट्थानीय‍जनकाय‍ू‍ैं जज‍ऄलग- ऄलग‍ऄजधकार-क्षेत्रों‍में‍काम‍करते‍ू।ैं ‍ूालांदक आु‍ऄनूठी‍िाुन‍ुंरचना‍के‍कारण‍ुंस्ट्थागत‍जरटलता‍प,दा‍ूजती‍ू‍, और‍ जाजभन्न‍एजेंजुयों‍के‍बीच‍ुमन्ाय‍की‍ुमस्ट्या‍भी‍अती‍ू,, दफर‍भी‍ये‍िूर‍कज‍एक‍बेजजड़‍क्षेत्रीय, राष्ट्रीय‍और‍ा,जिक‍ मूत्ा‍भी‍देता‍ू।, ददल्ली‍काफी‍मूत्ापूण‍व ू‍,और‍दजु नया‍म‍ें ुबुे‍तेजी‍ु‍े बढ़ती‍मेगाजुटी‍में‍ु‍े एक‍ू, और‍ऄंतरराष्ट्रीय‍ऄ्ययनों‍के‍ऄनुुार, यू‍एजिया-प्रिांत‍क्षेत्र‍म‍ें दुू री‍ुबुे‍बड़ी‍जनष्पादक‍और‍ुबुे‍तेजी‍ुे‍बढ़ती‍ऄथव्ास्ट्था‍ू।, ‍ददल्ली‍दजु नया‍के‍ऄग्रणी‍ स्ट्टाट-व ऄप‍आकजजुस्ट्टम‍में‍ुे‍भी‍एक‍ू।, ‍यू‍भारत‍और‍एजिया‍के‍ुबुे‍मूत्ापूणव‍्ापार‍केंद्रों‍में‍ुे‍एक‍ू‍, और‍ईिर‍ भारत‍का‍ुबुे‍बड़ा‍एां‍्स्ट्ततम‍लॉजजजस्ट्टक्ु‍और‍्ापार‍केंद्र‍ू।, ‍ददल्ली‍कज‍आु‍क्षमता‍का‍जनमावण‍करन‍े और‍प्रदीू ण, जडग्रेडेड‍पयावारण, भीड़भाड़, ुुरक्षा‍की‍कमी‍और‍ऄुमान‍जीानयापन‍जस्ट्थजतयों‍ज,ुे‍मुद्दों‍पर‍्यान‍देने‍की‍अाश्यकता‍ ू,, ये‍मुद्दे‍आुकी‍बाजार-क्षमता‍के‍जलए‍और‍ा,जिक‍बाजार‍कज‍अकर्नीत‍करने‍की‍ददिा‍म‍ेंएक‍खतरा‍ू।ैं ददल्ली‍कज‍दजु नया‍के‍मूान‍ऐजतूाजुक‍िूरों‍म‍ें भी‍जगना‍जाता‍ू,, जूां‍भानों‍और‍स्ट्मारक‍तथा‍तीन‍जाि‍धरजूर‍स्ट्थल‍ और‍एक‍जीांत‍चारदीाारी‍िूर‍भी‍ू,, जज‍केंद्रीय‍्ापार‍जजले‍का‍एक‍जूस्ट्ुा‍ू।, ‍आुके‍ऄजतररि , ददल्ली‍एजिया‍के‍ ुबुे‍ूरे‍भरे‍िूरों‍में‍ुे‍एक‍ू‍, और‍यमुना‍के‍दकनारे‍जस्ट्थत‍एक‍िूर‍ू।, ‍ददल्ली‍जनर्नमत‍और‍प्राकृजतक‍धरजूर‍के‍मामल‍े में‍भी‍ुुु ंपन्न‍ू , और‍आुकी‍ऄनूठी‍ुंपदा‍कज‍देखत‍े ुएए‍आुे‍ा,जिक‍ुांस्ट्कृजतक‍केंद्र‍बनाने‍की‍क्षमता‍का‍पता‍लगान‍े की‍ अाश्यकता‍ू।, 3050 GI/2021 (1)6 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ददल्ली‍राष्ट्रीय‍राजधानी‍क्षेत्र‍(एनुीअर) (लगभग‍55,083 ागव‍दकमी‍क्षेत्र)‍के‍म्य‍म‍ें जस्ट्थत‍ू,, जज‍ईिर‍प्रदिे ‍और‍ ूररयाणा‍के‍चार‍मूत्ापूण‍व िूरों‍ु‍े जघरी‍ुएइ‍ू।, ‍यू‍िूरी‍ुमूू‍ईिर‍भारत‍के‍जलए‍ईपभजग‍और‍जातरण‍केंद्र‍के‍रूप‍म‍ें कायव‍करता‍ू,, जजुका‍राष्ट्रीय‍ुकल‍घरेलू‍ईत्पाद‍म‍ें 7-8%‍जूस्ट्ुा‍ू,, जजुमें‍ददल्ली‍का‍यजगदान‍50%‍ुे‍ऄजधक‍ू।, ‍ाी‍व 2019‍में‍आु‍क्षेत्र‍म‍ें जनाेि‍म‍ें 95%‍की‍ाृजद्ध‍ुएइ‍ू।, ‍ददल्ली‍जनबावध‍ुंपकव‍्ास्ट्था‍और‍मजबूत‍बुजनयादी‍ढांचे‍के‍कारण‍ प्रमुख‍पुनर्नातरण‍केंद्र‍ू।, ‍भजाष्य‍में, जातरण‍और‍पुनः‍जातरण‍के‍कायव‍ददल्ली‍ुे‍स्ट्थानातं ररत‍ूजकर‍िीघ्र‍बनन‍े ााल‍े ुमर्नपत‍फ्रेट‍कॉररडजर‍और‍नजड्ु‍में‍जा‍ुकत‍े ू।ैं ‍ूालांदक,‍ददल्ली‍िूर‍कारजबार, ्ापार‍और‍जडजजटल‍लॉजजजस्ट्टक्ु‍के‍ जलए‍तथा‍क्षेत्रीय‍ऄथव्ास्ट्था‍के‍प्रधान‍ुंचालक‍के‍रूप‍में‍ऄपना‍अर्नथक‍प्रभुत्ा‍बनाए‍रखगे ा। केंद्रीय‍राष्ट्रीय‍राजधानी‍क्षेत्र (ुीएनुीअर)‍एकल‍ुामाजजक-अर्नथक‍आकाइ‍के‍रूप‍म‍ें कायव‍करता‍ू।, ‍आुमें‍मुख्य‍रूप‍ु‍े ददल्ली, गुड़गांा, फरीदाबाद, गाजजयाबाद‍और‍नजएडा‍िाजमल‍ू‍ैं जज‍एक‍दुू रे‍पर‍मजबूत‍जनभवरता‍प्रदर्नित‍करत‍े ू।ैं ‍ ददल्ली‍मेरज‍पूरे‍ुीएनुीअर‍कज‍ुेााए‍ं देती‍ू‍,और‍आुका‍एक‍बड़ा‍जूस्ट्ुा‍ऄतं र-िूर‍यात्राओं‍का‍ू‍,और‍जल्द‍अन‍े ााली‍ क्षेत्रीय‍र,जपड‍रेल‍िूर‍की‍ुीमाओं‍कज‍और‍भी‍कम‍कर‍देगी।‍आु‍तरू‍की‍मजबूत‍कनेजक्टजाटी‍के‍चलते, कायवस्ट्थल‍और‍ जनााु‍स्ट्थान‍के‍बारे‍म‍ें जनणवय‍लेन‍े के‍जलए‍राष्ट्रीय‍राजधानी‍क्षेत्र में‍लजगों‍के‍जलए‍दरू ी‍ऄब‍कजइ‍बड़ा‍कारक‍नूीं‍रूा‍ू।, ‍ ददल्ली‍िूर‍कज‍ऄपनी‍भााी‍भूजमका‍के‍जलए‍एक‍ऐुे‍िूर‍के‍रूप‍में‍यजजना‍बनाने‍की‍अाश्यकता‍ू‍, जज‍मनजरंजन, काय,व जनााु‍या‍ऄल्प‍प्रााु‍के‍ऄनेक‍जाकल्प‍प्रदान‍करता‍ू।, ‍ऐुा‍ददल्ली‍की‍ऄनूठी‍और‍जाजिष्ट‍ुंपदाओं‍और‍ जािेीताओं‍कज‍जाकजुत‍करके‍दकया‍जा‍ुकता‍ू‍,तादक‍एक‍ा,जिक‍ुांस्ट्कृजतक‍और‍अर्नथक‍केंद्र‍के‍रूप‍म‍ें आुका‍अकीणव ‍ बढ़ाया‍जा‍ुके।‍ राष्ट्रीय‍राजधानी‍राज्यक्षेत्र‍(एनुीटी)‍ददल्ली‍क्षेत्रफल‍के‍जलूाज‍ुे‍दिे ‍का‍ुबुे‍बड़ा‍िूर‍ू,, जज‍लगभग‍1486.5‍ाग‍व दकमी‍में‍फ,ला‍ू।, ‍आुम‍ें 367‍गााँा‍ू,ैं जजनमें‍ुे‍ऄजधकांि‍कज‍िूरी‍घजजीत‍दकया‍गया‍ू।, ‍11‍जजल,े 33‍तूुील/ुब- जडाीजन, 272‍ााडव‍और‍पांच‍स्ट्थानीय‍जनकाय‍ू‍ैं जज‍जुजाक‍प्रिाुन‍का‍ुंचालन‍करते‍ू‍ैं नामतः‍नॉथव‍डीएमुी, ुाईथ‍ डीएमुी, इस्ट्ट‍डीएमुी, नइ‍ददल्ली‍नगरपाजलका‍पररीद‍और‍कैंटजनमेंट‍बजडव।‍यजजना‍और‍प्रबंधन‍में‍अुानी‍के‍जलए‍ ददल्ली‍कज‍18‍यजजना‍क्षेत्रों‍में‍जाभाजजत‍दकया‍गया‍ू।, ददल्ली‍की‍जनुाजं ख्यकीय‍प्रजफाआल, जनुख्ं या‍ऄनमु ान‍और‍जाकाु‍ुबं धं ी‍जरूरतें:‍रजजगार, ईच्च‍जिक्षा‍और‍जनााु‍के‍ मामले‍में‍ददल्ली‍एक‍ऄत्यजधक‍पुंदीदा‍िूर‍ू।, ‍ददल्ली‍की‍जनुंख्या‍जपछले‍ुात‍दिकों‍ुे‍ईच्च‍दर‍पर‍बढ़ी‍ू।, ‍1951- 61, 1961-71, 1971-81, 1981-1991, 1991-01 और‍2001-11‍की‍भारत‍की‍जनगणना‍के‍ऄनुुार,‍एनुीटी‍ ददल्ली‍न‍े क्रमिः‍52.44%, 52.91%, 52.98%, 51.45%, 47.03% और‍21.20%, की‍दिकीय‍ाृजद्ध‍दर‍दज‍व की।‍ प्राकृजतक‍ाृजद्ध‍और‍प्रााुन‍दजनों‍के‍ुंदभव‍में‍ाृजद्ध‍दर‍जपछल‍े दज‍दिकों‍में‍कम‍ुएइ‍ू।, ‍ूालााँदक, ुम्पूणव‍ऄथ‍व म,ें एनुीटी ददल्ली‍म‍ेंभारत‍की‍अबादी‍का‍लगभग‍1.39% ू‍,और‍यू‍दजुनया‍के‍ुबुे‍ऄजधक‍अबादी‍ााले‍िूरों‍में‍ु‍ेएक‍ू।, ददल्ली‍एक‍बुए-ुांस्ट्कृजतक, मूानगरीय‍िूर‍ू‍, जूा‍ं देि‍में‍दुू री‍ुबुे‍बड़ी‍अप्रााुी‍अबादी‍रूती‍ू।, ‍जनगणना‍ 2011‍म‍ें लगभग‍2.26‍जमजलयन‍प्रााजुयों‍कज‍दज‍व दकया‍गया‍जज‍ददल्ली‍म‍ें 0-9‍ाीों‍ुे‍जनााु‍कर‍रू‍े थे।‍ूालांदक, जपछल‍े दिक‍(2001-11) म,ें ददल्ली‍म‍ें कुल‍प्रााु‍कम‍ूज‍गया‍ू।, ‍अर्नथक‍ुाेक्षण‍ररपजटव‍(2018-19) यू‍बताती‍ू‍, दक‍ काफी‍अप्रााुी‍पड़जुी‍राज्यों‍ुे‍थे‍और‍गड़ु गांा, फरीदाबाद, ुजनीपत, नजएडा, गाजजयाबाद अदद‍के‍जाकाु‍और‍ ुंबंजधत‍राज्य‍ुरकारों‍द्वारा‍िुरू‍दकए‍गए‍रजजगार‍ुंाधवन‍कायवक्रमों‍ने‍ददल्ली‍में‍प्रााु‍कज‍कम‍करने‍में‍यजगदान‍ददया‍ ू।, ‍ूालांदक, प्रााजुयों‍की‍पूणव‍ुंख्या‍काफी‍ऄजधक‍ू‍, और‍अााु, ुुजाधाओं‍और‍रजजगार‍के‍जाकल्पों‍की‍्ास्ट्था‍करन‍े के‍जलए‍ईनके‍प्रजफाआल‍की‍एक‍्ापक‍ुमझ, प्रााु‍के‍ईद्देश्य‍और‍ऄाजध‍कज‍जानना‍भी‍मूत्ापूणव‍ू।, भारत‍की‍स्ट्ातंत्रता‍और‍जाभाजन‍के‍ठीक‍बाद‍ददल्ली‍में‍अबादी‍में‍भारी‍ाृजद्ध‍ुएइ।‍िूर‍के‍मूल‍जनााजुयों‍के‍ऄलााा‍ कइ‍परराारों‍ने‍ददल्ली‍में‍रठकाना‍बनाया‍और‍कइ‍ऄन्य‍लजग‍ुमय‍बीतने‍के‍ुाथ‍ुरकारी‍नौकररयों‍और‍ऄन्य‍ऄाुरों‍ के‍जलए‍यूां‍चले‍अए।‍ातवमान‍म,ें ददल्ली‍की‍अबादी‍के‍एक‍बड़े‍जूस्ट्ुे‍की‍कुछ‍जड़ें‍आुी‍िूर‍म‍ें ू,ैं जजुमें‍एक‍पूरी‍ पीढ़ी‍िाजमल‍ू‍, जज‍यूां‍प,दा‍ुएइ‍और‍यूीं‍ईुन‍े पराररि‍पाइ।‍ददल्ली‍के‍अर्नथक‍ुाेक्षण‍2019-20‍के‍ऄनुुार, 30.3%‍ अबादी‍15-30‍ाी‍व की‍अय‍ु ागव‍की‍ू,, जजुुे‍ददल्ली‍दजु नया‍के‍ुबुे‍ऄजधक‍युाा‍अबादी‍ााले‍िूरों‍म‍ें ुे‍एक‍बन‍गइ‍ ू।, ‍ईच्च‍ुाक्षरता‍दर‍(86.2%) के‍ुाथ, ददल्ली‍म‍ें 15-59‍ाीव‍की‍अयु‍के‍बीच‍लगभग‍1.1‍जमजलयन‍लजगों‍का‍एक‍बड़ा‍ जिजक्षत‍कायवबल‍ू‍,(2011)।‍यू‍प्रजतभा‍कज‍रजक‍रखन‍े के‍जलए‍ऄजनाायव‍ितव‍के‍रूप‍में‍युााओं‍के‍जलए‍जिक्षा, कौिल‍और‍ रजजगार‍के‍ऄाुरों‍और‍स्ट्थान‍की‍्ास्ट्था‍करने‍तथा‍िूर‍एां‍देि‍के‍जलए‍एक‍कुिल‍कायवबल‍बनाने‍की‍अाश्यकता‍कज‍ रेखांदकत‍करता‍ू।, ‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 7 ददल्ली‍का‍कुल‍ललगानुपात‍और‍बाल‍ललगानुपात‍राष्ट्रीय‍औुत‍ुे‍कम‍ू,, ूालांदक‍दजनों‍में‍जपछल‍े एक‍दिक‍ुे‍ुुधार‍ देखा‍गया‍ू।, ‍ूालांदक‍जपछले‍दिक‍ुे‍कायविील‍अयु‍ााली‍मजूलाओं‍की‍अबादी‍में‍जूस्ट्ुेदारी‍बढ़ी‍ू‍, लेदकन‍मजूला‍श्रम‍ भागीदारी‍दर‍परुु ी‍कायवबल‍की‍तुलना‍म‍ें पााँच‍गनु ा‍कम‍जुफव‍14.3%‍ू।, ‍आु‍िूर‍कज‍कायबव ल‍म‍ें ऄजधक‍मजूलाओं‍कज‍ िाजमल‍ूजने‍के‍जलए‍प्रेररत‍करने‍पर‍्यान‍केंदद्रत‍करना‍ू।, ‍यू‍काय‍व ुुरजक्षत‍और‍मजूला‍ऄनुकूल‍ुड़कों, ुाावजजनक‍ स्ट्थलों‍और‍पयावप्त‍बाल‍देखभाल‍ुुजाधाएं‍देन‍े ााल‍े कायवस्ट्थलों‍की‍्ास्ट्था‍करके‍दकया‍जाना‍ूजगा।‍ददल्ली‍म‍ें मजूलाए‍ं अर्नथक‍रूप‍ु‍े स्ट्ातंत्र‍ूज‍रूी‍ू‍, आुुे‍ईम्मीद‍की‍जा‍ुकती‍ू,‍भले‍ूी‍ऄप्रत्यक्ष‍रूप‍ुे, ललग‍ऄनुपात‍में‍ुुधार‍करन‍े म‍ें मदद‍जमल‍ुकती‍ू।, ददल्ली‍की‍30% के‍करीब‍अबादी‍में‍0-18 ाीव‍के‍अयु‍ागव‍के‍बच्चे‍और‍युाा‍िाजमल‍ू,ैं जज‍ददल्ली‍कज‍ऄजधक‍बाल‍ ऄनुकूल‍िूर‍बनान‍े की‍अाश्यकता‍दिावता‍ू।, ‍जाि‍स्ट्तर‍पर, बच्चों‍का‍ुमग्र‍प्रारंजभक‍जाकाु‍जीान‍की‍ऄच्छी‍गुणािा‍ का‍ुूचक‍ूजने‍के‍रूप‍में‍ुाोपरर‍माना‍जाता‍ू,, जज बच्चों‍के‍स्ट्ास्ट्थ‍और‍ुकारात्मक‍ायस्ट्क‍बनने‍के‍जलए‍जरूरी‍ू।, ‍ आुजलए‍आु‍िूर‍में‍ुभी‍अय‍ुागव‍और‍क्षमताओं‍के‍बच्चों‍के‍जलए‍ऄाुंरचना‍ईपलब्ध‍कराना‍ऄत्यााश्यक‍ू।, ददल्ली‍ऄत्यजधक‍िूरीकृत‍ू।, ‍1901‍के‍53%‍की‍तलु ना‍म‍ें 2011‍में‍97%‍ुे‍ऄजधक‍अबादी‍िूरी‍थी।‍ातवमान‍म,ें ज्यादातर‍लजग‍मुख्यतः‍िूर‍के‍म्य, पूाी, दजक्षणी‍और‍ईिरी‍भाग‍में‍जनााु‍और‍कायव‍करते‍ू।ैं ‍2021-41‍की‍यजजना- ऄाजध‍म,ें िूर‍के‍पजिमी‍और‍ईिरी‍पररजध‍कज‍बड़े‍प,मान‍े पर‍जाकाु‍के‍जलए‍जनधावररत‍दकया‍गया‍ू।, ‍जनुंख्या‍का‍ घनत्ा‍1991‍के 6352‍्जि ‍प्रजत‍ागव‍दकमी.‍ुे‍बढ़कर‍2011‍में‍11,320‍्जि ‍प्रजत‍ागव‍दकमी‍ूज‍गया‍ू।, ‍िूर‍भर‍म‍ें घनत्ा‍ऄलग-ऄलग‍ू‍ैं और‍कम‍घनत्ा‍ााल‍े आलाकों‍कज‍ऄत्यजधक‍घनत्ा‍ााल‍े ऄजनयजजजत‍क्षेत्रों‍के‍जनकट‍बुाया‍गया‍ू‍, जजुके‍चलते‍िूर‍में‍पनु ःुुधार‍के‍जलए‍एक‍ऄजत‍जास्ट्तृत-्ापक‍नीजत‍बनान‍ेकी‍अाश्यकता‍ू।, जाजभन्न‍मापदंडों‍के‍ऄनुुार‍जाकाु‍मान्यताओं‍के‍अधार‍पर‍ाी‍व 2041 में‍ददल्ली‍की‍जनुंख्या‍ईच्च, म्यम‍और‍जनम्न‍ जाकाु‍पररदश्ृ यों‍के‍ऄनुुार‍क्रमिः‍30.9 जमजलयन, 29.1 जमजलयन‍और‍27.8 जमजलयन‍ूजना‍ऄनुमाजनत‍ू।, ‍जपछल‍े दज‍ दिकों‍में‍जाकाु‍दर‍में‍जगरााट‍के‍कारण‍के‍तौर‍पर, म्यम‍जाकाु‍पररदश्ृ य‍(29.1 जमजलयन)‍कज‍ुबुे‍ऄजधक‍ ुंभाजात‍ऄनुमान‍के‍रूप‍म‍ें ऄपनाया‍गया‍ू।, ‍आुके‍जलए‍जब‍भी‍जनुंख्या‍कज‍ऄद्यतन‍दकया‍जाए‍म्य-मागव‍में‍पनु ः‍ नाप-जजख‍की‍अाश्यकता‍ूजगी।‍ताजलका‍1 में‍पांच-ाीीय‍जाकाु‍ऄनुमानों‍कज‍ददखाया‍गया‍ू:, ददल्ली‍के‍जलए‍पाचं -ाीीय‍जाकाु‍ऄनमु ान ाी व परुु ी मजूला कुल (जमजलयन‍म)ें (जमजलयन‍म)ें (जमजलयन‍म)ें 2021 11 9.5 20.6 (अधार‍ाी)व 2026 12.2 10.4 22.6 2031 13.4 11.4 24.8 2036 14.6 12.3 26.9 2041 15.9 13.3 29.2 िूर‍की‍जनुांजख्यकी‍प्रजफाआल‍म‍ें दज‍मूत्ापूण‍व पररातवनों‍की‍ुंभााना‍ू।, ‍कायविील‍अयु‍(अय‍ु ाग-व 25-60‍ाीव)‍के‍ ्जि यों‍के‍ऄनुपात‍म‍ें भारी‍ाृजद्ध‍का‍ऄनुमान‍लगाया‍गया‍ू,, जज‍रजजगार‍के‍पयावप्त‍ऄाुर‍प,दा‍करन‍े और‍आु‍माना- अबादी‍द्वारा‍प्रस्ट्ततु ‍ुंभाजात‍अर्नथक‍लाभों‍का‍दजून‍करन‍े की‍अाश्यकता‍का‍ुंकेत‍देता‍ू।, ‍यू‍जाश्लेीण‍60‍ाी‍व या‍ ईुुे‍ऄजधक‍अयु‍ागव‍के‍्जि यों‍के‍ऄनुपात‍में‍ाृजद्ध‍कज‍भी‍आंजगत‍करता‍ू।, ‍आु‍तरू‍यू‍आु‍‍यजजना‍में‍बुजुगों‍के‍जलए‍ जाजिष्ट‍प्रााधान‍दकए‍जान‍े की‍अाश्यकता‍कज‍भी‍आंजगत‍करता‍ू।, जपछल‍े यजजना‍म‍ें ऄनुमान‍लगाया‍गया‍था‍दक‍50% जनुंख्या‍ाृजद्ध‍प्रााुन‍के‍कारण‍ूजगी।‍मौजूदा‍अबादी‍की‍बढ़ती‍ जरूरतों‍और‍भूजम‍की‍उंची‍कीमतों‍के‍कारण‍िूर‍में‍ऄजनयजजजत‍बजस्ट्तयों‍का‍जाकाु‍ुएअ‍ू।, ‍मौजूदा‍यजजना‍ऄाजध‍के‍8 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] दौरान‍प्रााुन‍ु े जनुंख्या‍में‍41%‍ाृजद्ध‍ूजने‍का‍ऄनुमान‍लगाया‍गया‍ू,, जज‍ऐुे‍नए‍प्रकार‍अााुों‍कज‍बनान‍े की‍ अाश्यकता‍कज‍रेखांदकत‍करता‍ू‍, जज‍जाजभन्न‍अय‍ागों‍और‍जाजभन्न‍कायवकाल‍ुंबंधी‍अाश्यकताओं‍की‍जरूरतों‍कज‍परू ा‍ कर‍ुके।‍‍ ददल्ली‍के‍जलए‍अधारभतू ‍(बुे लाआन)‍मल्ू याकं न :‍ातवमान‍जस्ट्थजत‍कज‍ुमझने‍के‍जलए‍और‍जाजभन्न‍क्षेत्रों‍के‍तूत‍्ाप्त‍ ऄंतराल‍का‍अकलन‍करन‍े के‍जलए, एमपीडी-2041‍के‍जलए‍ुभी‍ुंबंजधत‍जूतधारक‍एजेंजुयों‍कज‍िाजमल‍करते‍ुएए‍एक‍ ्ापक‍बेुलाआन‍बनाइ‍गइ‍थी।‍प्राथजमक‍और‍जद्वतीयक‍स्रजतों‍ुे‍डेटा‍आकट्ठा‍दकया‍गया‍था‍और‍परराून, पुएचं , ऄथव्ास्ट्था, धरजूर‍और‍ऄजनयजजजत‍बजस्ट्तयों‍के‍जलए‍ऄ्ययन‍दकए‍गए‍थे।‍लगभग‍200‍जािेीज्ञों‍न‍े ददल्ली‍म‍ें जाजभन्न‍ क्षेत्रों‍और‍जाकाु‍के‍पूलओंु ‍के‍ुंबंध‍म‍ें जानकारी‍दी।‍आु‍बुे लाआन‍काायद‍म‍ें ुभी‍कजर‍एजेंजुयां‍और‍केंद्र, राज्य‍और‍ स्ट्थानीय‍ुरकारों‍के‍जाभाग‍िाजमल‍थे।‍बेुलाआन‍तथा‍पष्ठृ भूजम‍के‍ऄ्ययन‍के‍ुाथ-ुाथ‍प्राृजियों‍और‍िजि यों, कमजजररयों, ऄाुरों‍और‍खतरों‍(एुडब्ल्यूओटी) के‍जास्ट्ततृ ‍जाश्लेीण‍ु‍े आु‍िूर‍ुे‍जड़ु े‍प्रमुख‍ुरजकारों‍के‍बारे‍म‍ें पता‍ चला।‍आन‍ुबकी‍पुजष्ट‍नागररकों, जूतधारकों‍और‍जािेीज्ञों,‍जजन्ूोंन‍े यजजना‍त,यार‍करन‍े के‍दौरान‍ुाावजजनक‍जाचार- जामिव‍में‍भाग‍जलया‍और‍केजन्द्रत‍ुामूजूक‍चचाव‍में‍भाग‍जलया,‍ुे‍प्राप्त‍जाचारों‍के‍अधार‍पर‍की‍गइ।‍ यजजना‍त,यार‍करते‍ुमय‍ददल्ली‍के‍लजगों‍कज‍िाजमल‍करके‍ईनकी‍राय, जाचार‍और‍अकांक्षाओं‍के‍बारे‍में‍जानकारी‍प्राप्त‍ की‍गइ।‍ऐुा‍ुीएुओ, अरडब्ल्यूए‍ुंघों, बाजार‍ुंघों, पेिेार‍जनकायों, ुाावजजनक‍ऄजभयानों‍अदद‍के‍ुाथ‍भागीदारी‍ करके‍तथा‍लजगों‍के‍ुाथ‍ुीधे‍ुंपकव‍करके‍दकया‍गया।‍जुतंबर‍ुे‍नांबर‍2020‍तक‍ुमर्नपत‍ऑनलाआन‍ुाावजजनक‍ परामि‍व अयजजजत‍दकए‍गए, जजनमें‍युााओं, दद्ागं जन, पेिेार‍लजगों, मजूला‍ुंबंधी‍मद्दु ों‍पर‍काम‍करन‍े ााल‍े एनजीओ, ऄनजधकृत‍कॉलजजनयों‍और‍झुजग्गयों‍में‍रूने‍ााले‍लजगों, ्ापाररयों, ईद्यजग‍के‍प्रजतजनजधयों‍अदद‍के‍ुाथ‍ुत्र‍अयजजजत‍ दकए‍गए।‍आन‍परामिों, केजन्द्रत‍ुामूजूक‍चचावओं, ऑनलाआन‍ाेब‍पजटवल‍और‍ुजिल‍मीजडया‍के‍मा्यम‍ुे, एक‍िूर- ्ापी‍अईटरीच‍का‍प्रयाु‍दकया‍गया‍जजुमें‍प्रजतभाजगयों‍ुे‍5000‍ुे‍ऄजधक‍जाज़न‍स्ट्टेटमेंट‍प्राप्त‍दकए‍गए‍थे।‍ बेुलाआन‍के‍ऄंतगवत, जपछले‍मास्ट्टर‍प्लानों‍की‍ुमीक्षा‍की‍गइ‍थी‍तादक‍ददल्ली‍के‍जाकाु-की‍ददिा‍का‍पता‍लगाया‍जा‍ ुके।‍एमपीडी-2021‍की‍जास्ट्तार‍ुे‍ुमीक्षा‍की‍गइ‍जजुुे‍आुके‍कायावन्ायन‍ुे‍ऄनुभा‍प्राप्त‍दकए‍जा‍ुकें।‍2021‍के‍ मास्ट्टर‍यजजना‍में‍जाकाु‍प्रदक्रया‍में‍जनजी‍क्षेत्र‍की‍भागीदारी‍कज‍ुुजाधाजनक‍बनाने‍की‍अाश्यकता‍कज‍स्ट्ाीकार‍दकया‍ गया‍तादक‍भूजम‍ऄजधग्रूण‍ुे‍जुड़ी‍चुनौजतयों‍कज‍दरू ‍दकया‍जा‍ुके‍और‍भूजम‍ुमेकन‍और‍जाकाु‍की‍प्रदक्रया‍कज‍कायव‍दक्ष‍ बनाया‍जा‍ुके।‍आुमें‍लडैं ‍पूललग, जमजश्रत-ईपयजग‍‍जाकाु-कायव, पारगमन-ईन्मुख‍जाकाु‍अदद‍ज,ुे‍कइ‍नए‍जुद्धांतों‍कज‍ भी‍िरुु ‍दकया‍गया। एमपीडी‍2041‍जपछले‍यजजना‍के‍आन‍नाीन‍प्रजतमानों‍पर‍अधाररत‍ू‍, और‍आुम‍ें 'कायवनीजतक' और‍ 'ुमथवकारी' फ्रेमाकव‍कज‍जाकजुत‍करन‍े के‍जलए‍ईपयुि ‍नीजतयां‍बनाइ‍गइ‍ू‍ैं जज‍िूर‍के‍भााी‍जाकाु‍का‍पजीण‍कर‍ ुकता‍ू।, ऄपन‍े अकार‍की‍ऄजधकांि‍मगे ाजुटीज‍की‍तरू‍ददल्ली‍की‍भी ऄपनी‍क्षमता‍और‍ऄाुर‍ू‍, लेदकन‍ये‍ऄाुर‍ऄाूनीय‍ िूरी‍स्ट्ारूप, जनर्नमत‍पयावारण‍के‍क्षरण, भूजम‍ईपयजग‍और‍परराून‍के‍बीच‍ऄुंतुजलत‍जस्ट्थजत‍के‍मद्दु ों‍के‍कारण‍कम‍ूज‍ जाते‍ू‍ैं जजुके‍कारण‍ऄाूनीय‍गजतिीलता‍प,टन,व ऄजनयजजजत‍जाकाु‍का‍प्रुार, स्ट्थान‍और‍ागों‍में‍नागररक‍ुेााओं‍तक‍ पुएचाँ ‍में‍ऄतं र प,दा‍ूजता‍ू‍, और‍एक‍ऐुा‍जाकाु‍प,टनव‍ईभरता‍ू‍, जज‍प्राकृजतक‍ााताारण‍के‍ुाथ‍मेल‍नूीं‍खाता।‍2041 की‍यजजनाबद्ध‍रूपरेखा‍में‍आन‍मुद्दों‍का‍एक‍ुमग्र‍तरीके‍ुे‍ुमाधान‍करने‍का‍प्रयाु‍दकया‍गया‍ू,, जज‍ददल्ली‍की‍ ऄंतर्ननजूत‍िजि यों‍और‍ऄनुकूल‍ऄाुरों‍पर‍अधाररत‍ू‍, तादक‍िूर‍की‍ाास्ट्तजाक‍क्षमता‍का‍लाभ‍ईठाया‍जा‍ुके।‍ बेुलाआलनग‍और‍ुाावजजनक‍परामिव‍करने‍के‍ुाथ-ुाथ‍जनुंख्या, ुंुाधन‍ईपलब्धता‍और‍अर्नथक‍जाकाु‍के‍ऄनुमानों‍ के‍जाश्लेीण‍ु‍े जनम्नजलजखत‍कुछ‍क्षेत्रों‍का‍पता‍चला‍ू‍,जजन‍पर‍फजकु‍दकया‍जाना‍ू:ैं मास्ट्टर‍यजजना‍के‍जलए‍मख्ु य‍फजकु‍क्षत्रे i. पयााव रणः‍यू‍िूर‍काफी‍ूरा-भरा‍ू‍, लेदकन‍आु‍ूररयाली‍का‍जातरण‍ऄुमान‍ू।, ‍कइ‍स्ट्थानों‍पर‍ूररयाली‍की‍ गणु ािा‍में‍भी‍ुुधार‍की‍अाश्यकता‍ू।, ‍आुके‍ऄलााा, ददल्ली‍लगातार‍ऄत्यजधक‍ाायु, जल‍और‍्ाजन‍प्रदीू ण‍ु‍े ग्रस्ट्त‍ू।, ‍यमुना‍भी‍बुरी‍तरू‍प्रदजू ीत‍ू।, ‍आुु‍े न‍केाल‍पयावारणीय‍ुंपदा‍और‍स्ट्थानीय‍ज,ा‍जाजाधता‍कज‍खतरा‍ू,, बजल्क‍नागररकों‍के‍स्ट्ाास्ट््य‍कज‍भी‍खतरा‍ू।,[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 9 ii. पानीः‍ददल्ली‍जल-ऄभाा‍ााला‍िूर‍ू‍, और‍दफर‍भी,‍यू‍ुंुाधन‍प्रणालीगत‍ूाजन, ुंरक्षण‍और‍पुनः‍ईपयजग‍की‍ कायवनीजत‍की‍कमी‍के‍कारण‍बबावद‍ूज‍जाता‍ू।, ‍आुुे‍ददल्ली‍की‍जाकाु‍ुंभाानाओं‍के‍ुाथ-ुाथ‍ददन-प्रजतददन‍की‍ गजतजाजधयों‍के‍जलए‍पानी‍की‍बुजनयादी‍जरूरतों‍पर‍गंभीर‍प्रभाा‍पड़ता‍ू,। iii. मूत्ापणू ‍व ुुं ाधनः‍ददल्ली‍में‍जबजली‍की‍खपत‍और‍कचरे‍के‍ईत्पादन‍कज‍कम‍करने‍की‍अाश्यकता‍ू,, ये‍दजनों‍ूी‍ देि‍में‍ुबुे‍ऄजधक‍खराब‍जस्ट्थजतयां‍ू।ैं ‍ूमें‍कचरे‍का‍पुनचक्रव ण‍और‍नाीकरणीय‍उजाव‍का‍प्रयजग‍करने‍के‍प्रयाु‍ करने‍ूोंगे। iv. गजतिीलताः‍िूर‍म‍ें ऄच्छा‍ुाावजजनक‍परराून-तंत्र‍ईपलब्ध‍ू,, लेदकन‍यूां‍बड़ी‍ुंख्या‍में‍जनजी‍ााून‍ू‍ैं जज‍भीड़, ऄजनयजजजत‍पार्ककग, ाायु‍प्रदीू ण‍अदद‍का‍कारण‍ू।ैं नागररकों‍जािेी‍रूप‍ु‍े दद्ागं जन, बुजुगों‍और‍बच्चों‍के‍जलए‍ गजतिीलता‍म‍ें ुुधार‍लान‍े के‍जलए‍गंत्‍स्ट्थान‍तक‍कनेजक्टजाटी‍और‍प,दल‍चलन‍े एां‍ुाआदकल‍चलान‍े के‍जलए‍ ऄाुंरचना‍का‍जनमावण‍दकया‍जाना‍चाजूए।‍‍ v. अााुः‍िूर‍म‍ें भूजम‍की‍उंची‍कीमतों‍के‍कारण‍अााु‍की‍जरूरतों‍और‍अााु‍की‍अपूर्नत‍के‍बीच‍एक‍ऄुंतलु न‍ प,दा‍ूज‍गया‍ू।, ‍ददल्ली‍का‍एक‍बड़ा‍जूस्ट्ुा‍ऄजनयजजजत‍ू‍,जूां‍ऄनजधकृत‍कालजजनयां‍ऄपना‍मकान‍देने‍के‍ुाथ-ुाथ‍ दकराये‍के‍मकान‍देन‍े के‍कम‍मूगं े‍जाकल्प‍देकर‍अााु‍की‍अाश्यकता‍कज‍पूरा‍करती‍ू।, ‍जनमावण‍की‍खराब‍गुणािा‍ और‍ईच्च‍जनर्नमत‍घनत्ा‍के‍कारण, ये‍जाकाु‍कायव‍ऄुुरजक्षत‍ू।ैं ‍नए‍प्रकार‍के‍तथा‍जभन्न‍जभन्न‍कायवकाल‍के‍अााु‍ बनान‍े की‍अाश्यकता‍ू।, vi. जनर्नमत‍पयााव रण‍और‍ुााजव जनक‍स्ट्थानः‍िूर‍म‍ें ुुजाधाएं‍और‍खुल‍े स्ट्थान‍जनुंख्या‍म‍ें जनरंतर‍ाृजद्ध‍के‍ुाथ‍ऄपयाप्तव ‍ ूज‍गए‍ू।ैं ‍कइ‍क्षेत्रों‍में‍मौजूदा‍जनर्नमत‍स्ट्टॉक‍पुराना‍और‍जीणव‍ू।, ‍ुाावजजनक‍स्ट्थलों‍कज‍ुब‍के‍जलए‍ुलु भ‍और‍ ुुरजक्षत‍बनाना‍ूजगा।‍आुजलए, िूर‍में‍कुछ‍क्षेत्रों‍की‍ऄारुद्ध‍क्षमता‍कज‍ईजागर‍करन‍े के‍जलए‍पनु ःुुधार‍के‍ुाथ- ुाथ‍कायवनीजतक‍ूस्ट्तक्षपे ‍की‍अाश्यकता‍ू।, vii. धरजूर‍ुपं दाः‍ददल्ली‍एक‍ुांस्ट्कृजतक‍राजधानी‍ू‍, और‍यूा‍ाँ बड़ी‍ुंख्या‍म‍ें धरजूर‍ुंपदा‍ू।, ‍ऐजतूाजुक‍ुंपदा‍और‍ ुंरचनाओं‍के‍क्षरण‍और‍नुकुान‍कज‍रजकने‍के‍जलए‍आु‍ुंपदा‍के‍ुंरक्षण‍और‍ईनके‍ऄनुकूली‍पुन:‍ईपयजग‍कज‍बढ़ााा‍ ददया‍जाना‍ूजगा। viii. ुां दे निीलताः‍ददल्ली‍भूकंपीय‍क्षेत्र‍चार‍में‍अती‍ू‍, और‍अग‍लगन‍े एा‍ं बाढ़‍ुे‍जड़ु ी‍भूकंप‍की‍घटनाओं‍के‍ईच्च‍ जजजखम-क्षेत्र‍में‍ू।, ‍उंची‍उंची‍आमारतों,‍और‍मकान‍की‍खराब‍गुणािा‍और‍अयु‍आु‍ऄुुरक्षा‍कज‍और‍भी‍बढ़ाती‍ू।, ‍ कजजाड-19‍मूामारी‍ने‍जाकेंद्रीकृत‍ऄाुंरचना‍ााली‍स्ट्ातः‍पूणव‍और‍जमजश्रत‍ईपयजग‍ााले‍क्षेत्रों‍कज‍बनाने‍की‍ अाश्यकता‍कज‍रेखांदकत‍दकया। ix. अर्नथक‍क्षमताः‍ददल्ली‍कज‍एक‍अर्नथक‍केंद्र‍के‍रूप‍में‍ऄपनी‍जाजिष्ट‍‍भूजमका‍और‍क्षमता‍का‍पूरी‍तरू‍ुे‍दजून‍ करना‍ ू।, ‍ जाजिष्ट‍ स्ट्ाास्ट््य‍ और‍ ईच्च‍ जिक्षा‍ फजकु‍ क्षेत्र‍ ू।ैं ‍ ईद्यजमयों‍ के‍ जलए‍ ऄाुर‍ और‍ ऄच्छी‍ कायविील‍ पररजस्ट्थजतयां‍ुृजजत‍करने‍के‍ऄलााा,‍जाजभन्न‍प्रकार‍के‍लचील‍े और‍ुाझा‍स्ट्थान‍की‍्ास्ट्था‍करके‍स्ट्ाच्छ‍ईत्पादन, स्ट्टाट-व ऄप, नााचार‍और‍ुाआबर‍आकजनॉमी‍कज‍बढ़ााा‍देना‍ूजगा।‍अर्नथक‍क्षमता-‍जािेी‍क्षेत्रों‍ज,ुे‍दक‍जाजिष्ट‍ स्ट्ाास्ट््य,‍ईच्च‍जिक्षा,‍पयवटन‍और‍एम‍अइ‍ुी‍इ‍अधुजनक‍लॉजजजस्ट्टक‍और‍जािेीीकृत‍्ापार‍कज‍भी‍बढ़ााा‍देने‍की‍ अाश्यकता‍ू।, x. जनगरानी‍और‍मल्ू याकं नः‍बुए-एजेंुी‍ुमन्ाय‍के‍ुाथ‍िूर‍के‍स्ट्तर‍पर‍एक‍ुाझा‍डेटाबेु‍त,यार‍करन‍े की‍अाश्यकता‍ ू‍, तथा‍एकीकृत‍जनगरानी‍प्रजटजकॉल‍स्ट्थाजपत‍करन‍े की‍अाश्यकता‍ू।, ‍आुुे‍िूर‍और‍जाजभन्न‍क्षेत्रों‍की‍प्रगजत‍पर‍ नजर‍रखन‍े म‍ें मदद‍जमलगे ी।‍आु‍िूर‍और‍यजजना‍के‍जलए‍यू‍अाश्यक‍ू‍, तादक‍ूज‍रूी‍प्रगजत‍का‍ुमय-ुमय‍पर‍‍‍ मूल्यांकन‍ुंभा‍ूज‍पाए‍और‍पररातवन‍के‍ऄनुुार‍ढलें‍एा‍ं त्रुरट‍ुुधार‍दकया‍जा‍ुके।‍स्ट्तरीय‍जाकाु‍करने‍के‍जलए‍ ुभी‍एजेंजुयों‍और‍जूतधारकों‍कज‍ुजम्मजलत‍प्रयाु‍करन‍े की‍अाश्यकता‍ू।, --- x --- x ---- x --- x ---10 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 1.0 ददल्ली‍जाज़न‍2041 1.1 जाज़न‍2041 1.1.1 जाज़न‍ू-, ‍‍"ददल्ली‍कज‍ुतत, रून‍ेयजग्य‍और‍जीातं ‍बनाना" 1.1.2 यजजना‍ऄाजध‍म‍ेंजनम्नजलजखत‍लक्ष्य‍प्राप्त‍करन‍े का‍प्रयाु‍दकया‍जाएगा: 1.1.2.1 लक्ष्य‍1 (G1):‍पयावारणीय‍दजृष्ट‍ुे‍ुंपजीणीय‍िूर‍का‍जनमाणव ‍जज‍ऄपन‍े नागररकों‍के‍जलए‍स्ट्ास्ट्थ‍ ााताारण‍प्रदान‍कर‍ुके‍और‍जलाायु‍पररातवन‍के‍प्रभााों‍कज‍ुू‍ुके।‍ 1.1.2.2 लक्ष्य‍2 (G2):‍भजाष्य‍के‍जलए‍त,यार‍िूर‍का‍जाकाु‍ूज‍जज‍कुिल‍गजतिीलता‍तंत्र‍के‍ुाथ-ुाथ‍ ऄच्छी‍गणु ािा, ुस्ट्ता‍और‍रूने‍के‍जलए‍ुुरजक्षत‍ााताारण‍प्रदान‍करे। 1.1.2.3 लक्ष्य‍3 (G3):‍अर्नथक, रचनात्मक‍और‍ुांस्ट्कृजतक‍जाकाु‍के‍जलए‍एक‍गजतिील‍स्ट्थान‍के‍रूप‍म‍ें ईभरना। 1.1.3 यजजना‍म‍ें जाजाधता‍कज‍भी‍स्ट्ाीकार‍दकया‍गया‍ू‍, और‍यू‍एक‍ुमााेिी‍िूर‍बनान‍े की‍ददिा‍म‍ें काम‍ करता‍ू‍,जूा‍ं ुभी‍कज‍ुुजाधाएं‍और‍ऄाुर‍प्राप्त‍ूों।‍ 1.2 2041 के‍जलए‍ईद्देश्य 1.2.1 यू‍जाजन‍और‍लक्ष्य‍6‍ईद्देश्यों‍के‍मा्यम‍ुे‍प्राप्त‍दकए‍जाएगं े: G1जी1 1. Pr1io.r itiपzयinाgाव रEणnीvयir oजnस्ट्थmरeतnा taकlज Suप्रsाथtaजiमnकaतbाi litदyने ा 2. Fa2c.il itअatर्नiथngक Eजcाoकnाoुm कicज Dुeगु vमe loबनpाmनाe nt S ददल्ली E NDE IUL जH ाAI ज़ न जी2 V TI य 3. En3h.a nजcाiरnाgु तH,e riुtaस्ट्ं कgृजeत, Cऔuरlt uुreाा &जव Pजनuकb licज ीLाifनe का ुां धनव VISION G2 C श् or( gp 2 r so 0trp u42o cs 1t0e ud r4 e )1 E J ेद्द ई4. Im4p.r oअvinाgाु H oऔuरs inुgाम aाnजजdक S oऄcाiaुlरं Iचnfनraा sमtrें uुcधुtuाrरe B O 5. M5o.v inलgज -toकwाबaनवrd sम जLजoबwजल-टCीa rकbीo nओ Mर oबbढ़iनlitाy जी3 G3 6. De6v.e lुoूpनinिgी लR eभsiौliजeतnकt Pऄhाyुsiरंcचaनl ाi nकfraा sजtाruकcाtुu reकरना 1.2.1.1 ईद्देश्य‍1:‍पयााव रणीय‍जस्ट्थरता‍कज‍प्राथजमकता‍दने ा‍-‍ददल्ली‍के‍जाकाु‍के‍जलए‍पयावारणीय‍मुद्दों‍ तथा‍प्राकृजतक‍ुंपदाओं‍के‍कायाकल्प, प्रदीू ण‍कज‍कम‍करन,े जनर्नमत‍ााताारण‍कज‍ूरा-भरा‍करन,े िूरी‍खेती‍ज,ुी‍ूररत‍कायवकलापज‍की‍ुूायता‍करन‍े और‍प्राकृजतक‍एां‍जनयजजजत‍खुल‍े स्ट्थानों‍के‍ जाजाध‍रूप‍बनान‍े कज‍प्राथजमकता‍देना‍। 1.2.1.2 ईद्देश्य‍2:‍अर्नथक‍जाकाु‍कज‍ुगु म‍बनाना‍-‍एनुीअर‍के‍ुाथ‍ुंबंध‍ुुजनजित‍करते‍ुएए,‍ुमग्र‍ जनाेि‍माूौल‍म‍ें ुुधार‍और‍ऄनेक‍प्रकार‍के‍काय‍व और‍कायवस्ट्थलों‍कज‍ुपजट‍व करत‍े ुएए‍स्ट्ाच्छ‍ ऄथव्ास्ट्थाओं‍कज‍बढ़ााा‍देना, ददल्ली‍के‍जलए‍एक‍ऄजद्वतीय‍अर्नथक‍भूजमका‍जनभाना। 1.2.1.3 ईद्देश्य‍3:‍धरजूर, ुस्ट्ं कृजत‍और‍ुााजव जनक‍जीान‍का‍ुां धनव ‍–‍धरजूर‍और‍ुांस्ट्कृजतक‍ुंरचनाओं‍की‍ ुुरक्षा‍और‍ईनका‍‍ुंाधवन‍करना,‍मजबूत‍अर्नथक‍ुंबंध‍बनाना‍तथा‍ुांस्ट्कृजतक‍ऄनुभा, पयवटन‍एा‍ं ुदक्रय‍ुाावजजनक‍जीान‍के‍जलए‍ऄाुर‍प,दा‍करना।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 11 1.2.1.4 ईद्देश्य‍4:‍अााु‍और‍ुामाजजक‍ऄाुरं चना‍म‍ें ुधु ार‍-‍जाजभन्न‍अय‍ाग‍व और‍ुमूू‍के‍लजगों‍की‍‍ जाजभन्न‍प्रकार‍की‍अााु‍मांगों‍कज‍पूरा‍करने‍के‍जलए पुरानी‍जनर्नमत‍ुंरचनाओं‍के‍पनु ःुुधार‍कज‍ बढ़ााा‍देना, िूर‍के‍घने‍क्षेत्रों‍में‍ुामाजजक‍बुजनयादी‍ढांचे‍की‍मााँगों‍कज‍पूरा‍करना, और‍पुरानी‍ आमारतों‍कज‍ुुधारना‍और‍प,दल‍चलने‍यजग्य‍जमजश्रत-ईपयजग‍ााले‍आलाकों‍कज‍बढ़ााा‍देना। 1.2.1.5 ईद्देश्य‍5:‍लज-काबनव ‍मजजबजलटी‍कज‍बढ़ााा‍दने ा‍-‍ुाावजजनक‍परराून‍और‍ुाझा‍परराून‍ुाधनों‍ का‍आस्ट्तेमाल‍करन‍े के‍जलए‍लजगों‍कज‍प्रजत्ुाजूत‍करना, घरों‍और‍नौकररयों‍कज‍जन-परराून‍के‍ करीब‍लाना, ााूनों‍की‍भीड़‍कज‍कम‍करना‍और‍गजतिीलता‍के‍कुिल, ुस्ट्ते‍और‍ूररत‍जाकल्प‍ प्रदान‍करना। 1.2.1.5 ईद्देश्य‍6:‍ुूनिील‍भौजतक‍ऄाुरं चना‍का‍जाकाु‍करना‍-‍पानी‍और‍उजा‍व ज,ुे‍ुंुाधनों‍के‍ ईपयजग‍के‍जलए‍एक‍जााेकिील‍दजृष्टकजण‍कज‍बढ़ााा‍देना,‍पयावप्त‍और‍जनबावध‍ुेााओं‍की‍ुुजाधा‍ प्रदान‍करना‍तादक‍यू‍िूर‍जडजजटल‍आन्फ्रास्ट्रक्चर‍की‍दजृष्ट‍ुे‍त,यार‍ूज‍और‍अघातों‍एां‍अपदाओं‍ कज‍ुू‍ुके।‍‍ 1.2.2 यू‍मास्ट्टर‍यजजना‍की‍ुमथवकारी‍नीजतगत‍फ्रेमाकव‍ू।, ‍जाकाु‍कायवनीजतयों‍कज‍त,यार‍करन‍े के‍जलए‍आन‍6 ईद्देश्यों‍के‍जलए‍एक‍ऄलग‍नीजत‍क्षेत्र‍स्ट्थाजपत‍दकया‍गया‍ू।, ‍मास्ट्टर‍यजजना‍की‍ुभी‍नीजतयााँ, स्ट्थाजनक‍ जाकाु‍कायवनीजतयां‍और‍जाकाु‍जनयंत्रण‍मानदंड‍‍जाजभन्न‍प्रजत्ुाून/ईपकरण, जाजनयामक‍प्रााधान‍और‍ मागवदिी‍रूपरेखा‍बनान‍े के‍जलए‍त,यार‍दकए‍गए‍ू।, 1.2.3 आन‍6‍ईद्देश्यों‍कज‍प्राप्त‍करने‍के‍जलए‍एमपीडी‍41‍म‍ेंिाजमल‍प्रमुख‍जािेीताओं‍का‍ुारांि: ताजलका‍1.0:‍एमपीडी 2041‍की‍मख्ु य‍जािीे ताए ाँ ुमूू जािीे ता ऄ्याय‍ुदं भ व पयााव रण ग्रीन‍और‍ब्लू‍ुम्पदा‍(प्राकृजतक‍और‍जनयजजजत)‍कज‍ग्रीन-ब्लू‍आंफ्रास्ट्रक्चर‍रीट‍ ENV1,‍ENV2 (ईद्देश्य‍1)‍ करने‍के‍जलए‍्ापक‍रूपरेखा‍बनाना‍तादक‍बेूतर‍जनरंतरता‍ुुजनजित‍ूज‍ ुके‍और‍प्रदीू ण‍की‍ुमस्ट्या‍ुे‍जनपटने‍के‍जलए‍कायवनीजतयां।‍ ुाावजजनक‍आंटरफेु‍के‍ुाथ‍प्राकृजतक‍ुंपदा‍की‍ुुरक्षा‍और‍ुां धवन‍ ENV2 प्राकृजतक‍नालों‍के‍अु-पाु‍नए‍िूरी‍स्ट्तर‍की‍ुंपदा-ग्रीनाे, ऄप्रयुि ‍स्ट्थलों‍ ENV2 और‍बंजर‍भूजम‍कज‍ग्रीन-ब्लू‍ुपं दा‍के‍रूप‍म‍ेंदफर‍ु‍ेत,यार‍करना यजजना‍स्ट्ाीकृजत‍के‍जलए‍भूखंडों/भानों‍कज‍ूरा‍बनाना‍‍और‍ग्रीन-ब्लू‍फ,क्टर‍ ENV2 (जीबीएफ) की‍िुरुअत‍ पाकों‍का‍ुुधार‍और‍जािेी‍क्षमताओं‍ााल‍ेपाकों‍के‍जलए‍प्रााधान ENV2 ूररत‍ऄथव्ास्ट्थाओं‍के‍बड़े‍पम, ाने‍पर‍कायावन्ायन, स्ट्ाच्छ‍उजाव‍ईत्पादन‍कज‍ ENV2,‍DEV2 बढ़ााा‍देने‍और‍ूररत‍जाकाु‍कज‍बढ़ााा‍देने‍के‍जलए‍ुमर्नपत‍ग्रीन‍डेालेपमेंट‍ एररया। ऄथ्व ास्ट्था स्ट्ाच्छ‍ऄथव्ास्ट्थाओं‍की‍स्ट्थापना‍के‍जलए‍प्रजत्ुाून ECO (ईद्देश्य‍2) कायनव ीजतक‍औद्यजजगक‍ुंपदा‍और‍जडजस्ट्रक्ट‍ुेंटुव‍कज‍ज्ञान, जाि, ुेााओं, ECO ुंस्ट्कृजत‍या‍रचनात्मक‍ईद्यजगों‍में‍पररातवन‍कज‍बढ़ााा‍देना ुेाायुि ‍ऄपाटवमेंट, कामकाजी‍मजूलाओं‍के‍छात्राााु, स्ट्टाट-व ऄप‍ूब, ुाझा‍ ECO कायवस्ट्थल, इ-कॉमुव, अदद‍ज,ुी‍ुूायक‍ुुजाधाओं‍के‍जलए‍ुरल‍मानदंड12 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] पुनःुुधार‍के‍जलए‍प्रजत्ुाून‍दके र‍कायव-केंद्रों‍का‍अधुजनकीकरण ECO िूर‍के‍प्राेि‍लबदओंु ‍के‍अजत्य, ुंभाररकी‍और‍माल‍ढुलाइ, स्ट्ाास्ट््य‍और‍ ECO,‍DEV3 जिक्षा‍ूब‍के‍रूप‍म‍ेंबढ़ााा‍देना कचरा‍जनपटान‍-कमी, घरेल‍ूईद्यजग, ुड़क‍पर‍ुामान‍बेचन‍ेाालों‍‍ुजूत‍ ECO ऄन्य‍ऄुंगरठत‍कायवकलापों‍के‍जलए‍ुूायता धरजूर,‍ुस्ट्ं कृजत‍‍और‍ धरजूर‍‍क्षत्रे , पुराताजत्ाक‍पाकव‍और‍ुांस्ट्कृजतक‍पररुरों‍‍के‍रूप‍में‍ुांस्ट्कृजतक‍ HCP2 ुााजव जनक‍जीान‍ दजृ ष्ट‍ुे‍मूत्ापूण‍व क्षेत्रों‍की‍पूचान (ईद्देश्य‍3) पूचान‍दकए‍गए‍क्षेत्रों‍और‍ुांस्ट्कृजतक‍पररुरों‍के‍भीतर‍ुंरक्षण, पुनःुुधार‍ HCP2 और‍ऄनुकूल‍पुन:‍ईपयजग‍के‍जलए‍प्रााधान धरजूर‍टीडीअर‍(TDR) की‍िुरुअत‍ HCP2 ुदक्रय‍फ्रंटेज, चौक‍और‍प्लाजा, ुड़क‍ुुधार, ुाावजजनक‍स्ट्थलों‍पर‍पद, ल‍ HCP1 चलन‍े यजग्य‍स्ट्थान‍बनान‍ेकी‍यजजनाओं‍का‍कायावन्ायन‍और‍ुुरक्षा अश्रय‍ (िल्े टर)‍ और‍ जनयजजजत‍और‍ऄजनयजजजत‍क्षेत्रों‍का‍पुनःुुधार‍ SSI1,‍DEV3 ुामाजजक‍ऄाुरं चना‍ दकराये‍की‍अााु‍्ास्ट्था, छजटे‍मकानों‍और‍ुस्ट्ते‍अााु‍(जािेी‍रूप‍ुे‍ SSI1 (ईद्देश्य‍4) जािाल‍परराून‍तंत्र‍के‍करीब)‍कज‍बढ़ााा‍देना कायव‍या‍जिक्षा‍केंद्रों‍के‍करीब कोंडजजमजनयम, ूॉस्ट्टल, छात्र‍ूते ु‍अााु, SSI1 कामगार‍अााु‍अदद‍की‍्ास्ट्था नए‍ईपयजगों‍और‍भााी‍जरूरतों‍के‍जलए‍ुामाजजक‍ऄाुंरचना‍ूते ु‍मानदडं ों‍ SSI2 और‍श्रेजणयों‍का‍ुरलीकरण।‍ईपलब्धता‍और‍पुएचं ‍म‍ेंुुधार‍के‍जलए‍जमजश्रत‍ ईपयजग, ार्टटकल‍जमलक्ुग‍और‍बुए-ुुजाधा‍ााले‍प्लॉट घनी‍अबादी‍ााले‍क्षेत्रों‍म‍ेंुुजाधाओं‍की‍ईपलब्धता‍बढ़ान‍े के‍जलए‍ुुजाधा- SSI2,‍DEV3 एफएअर‍और‍मानदडं ों‍की‍कम‍ुंख्या‍ज,ुे‍ईपायों‍की‍िुरुअत‍ गजतिीलता गजतिीलता‍के‍प्रबंधन‍के‍जलए‍एकीकृत‍ुंस्ट्थागत‍ढांचा MOB1 (ईद्देश्य‍5) जन‍परराून‍के‍ऄनुरूप‍पारगमन‍ईन्मुख‍जाकाु‍ MOB2,‍DEV4 ‍ कायवनीजतक‍गजतिीलता‍के‍गजलयारों‍की‍पूचान। MOB1 प,दल‍चलने‍और‍ुाआदकल‍के‍प्रयजग‍कज‍बढ़ााा‍देन‍े पर‍्यान‍दने ा। MOB3 आलेजक्रक‍ााूनों‍और‍ऄन्य‍ूररत‍गजतिीलता‍के‍जाकल्पों‍कज‍मुख्यधारा‍म‍ें MOB1 लाने‍कज‍प्रजत्ुाजूत‍करना ुाावजजनक‍ परराून‍ की‍ ईपलब्धता, आलेजक्रक‍ ााूनों‍ के‍ जलए‍ स्ट्थान‍ MOB4 जचजननत‍करन,े पार्ककग‍और‍पार्ककग‍प्रबंधन‍के‍ऄनुुार‍जभन्न‍जभन्न‍पार्ककग‍ मानदंड मल्टी-मजडल‍आंटीग्रेिन‍(मल्टी-मजडल‍ूब‍के‍जाकाु‍ुजूत)‍और‍यात्रा‍िरूु ‍ MOB2,‍ करने‍के‍स्ट्थान‍ुे‍लेकर‍गतं ्‍स्ट्थान‍तक‍कनेजक्टजाटी‍की‍ुुजाधा MOB3 भौजतक‍ऄाुरं चना‍ दीघवकालीन‍जल‍ुुरक्षा‍के‍जलए‍एकीकृत‍जल‍ुंुाधन‍प्रबंधन‍(जल‍अपूर्नत, INF1 (ईद्देश्य‍6) ऄपजिष्ट‍जल‍प्रबंधन‍और‍ाीाव‍जल‍प्रबंधन‍के‍जलए‍ुंयुि ‍नीजत) जलापूर्नत‍मानदडं ों‍कज‍युजि ुंगत‍बनाना INF1 ऄपजिष्ट‍जल‍ईपचार‍का‍जाकेंद्रीकरण, कचरे‍की‍रर-ुाआकललग‍और‍री- INF1,‍INF2 ुाआदकल‍दकए‍गए‍पानी‍और‍ठजु‍ऄपजिष्ट‍के‍ऄजधकतम‍पुन:‍ईपयजग‍के‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 13 जलए‍मानदडं स्ट्ाच्छ‍उजाव‍का‍ईत्पादन‍और‍ईपयजग INF3 ुामुदाजयक‍स्ट्तर‍पर‍जल‍ुंचयन‍और‍भूजमगत‍जल‍की‍‍पनु भवरण‍ुुजाधाओं‍ INF1 की‍्ास्ट्था‍ ूररत‍भानों‍कज‍बढ़ााा‍देना‍ DEV1-4 जडजजटल‍और‍दरू ुंचार‍ऄाुंरचना‍की‍्ास्ट्था INF3 अपदा‍प्रबधं न‍(भूकंप, अग‍और‍बाढ़) INF4 1.3 एमपीडी-41‍के‍जलए‍ऄपनाए‍गए‍प्रमखु ‍जनदिे 1.3.1 आु‍िूर‍के‍भााी‍जाकाु‍का‍पजीण‍करने‍और‍जाजभन्न‍नीजतयों‍के‍कायावन्ायन‍में‍अुानी‍और‍लचीलापन‍ लाने‍के‍जलए‍5‍प्रमुख‍ददिा-जनदेिों‍कज‍कायवनीजतक‍रूप‍ददया‍गया‍ू।, 1.3.2 ुमग्र‍स्ट्थाजनक‍जाकाु:: आु‍यजजना‍म‍ें एकीकृत‍स्ट्थाजनक‍जाकाु‍कायवनीजत‍का‍प्रााधान‍दकया‍गया‍ू‍, जजुम‍ें घनत्ा‍के‍पररातवनीय‍जातरण‍और‍एफएअर‍िाजमल‍ू‍ैं जज‍िूरी‍केंद्र‍ु‍े जनकटता, पयावारणीय‍भद्ये ता, जािाल‍ुाावजजनक‍परराून‍की‍ईपलब्धता, और‍यूााँ‍रून,े काम‍करने, मनजरंजन‍एां‍जन‍जीान‍के‍भााी‍ केंद्र‍के‍रूप‍म‍ेंऄनुकूल‍ुंभाानाओं‍ज,ुे‍कारकों‍पर‍अधाररत‍ू।ैं ‍प्रस्ट्ताजात‍जाकाु‍स्ट्पेक्रम‍नीचे‍ददया‍गया‍ू:,‍ ऄजधक‍एफएअर‍म्य/ईच्च‍घनत्ा म्य‍एफएअर‍/‍म्य‍घनत्ा पारगमन‍ईन्मुख‍जाकाु‍यजजनाएं लैंड‍पूललग‍के‍मा्यम‍ुे‍नए‍क्षत्रे ों‍का‍जाकाु केन्द्रीय‍्ाुाय‍जजला जनयजजजत‍तथा‍ऄजनयजजजत‍क्षत्रे ों‍के‍जलए‍िूरी‍ पुनः‍ुुधार‍यजजनाए ं प्रजतबजं धत‍जाकाु जनम्न‍एफएअर‍जनम्न‍घनत्ा पयावारणीय‍ुुरक्षा‍के‍ऄन्तगवत‍क्षेत्र ूररत‍जाकाु‍के‍जलए‍जनधावररत‍क्षेत्रों‍के‍ऄंदर‍ जाकाु 1.3.3 जाकाु‍के‍जलए‍कायनव ीजतक‍दजृष्टकजण:‍आु‍यजजना‍में‍कुछ‍कायवनीजतक‍जाकाु‍केंद्रों/कॉरीडजर‍की‍पूचान‍की‍ गइ‍ू‍, जूां‍ईच्च‍एफएअर‍अदद‍ज,ुे‍प्रजत्ुाून‍प्रदान‍दकए‍जाते‍ू।ैं ‍यू‍भााी‍जाकाु‍के‍ुंभाजात‍केंद्रों‍म‍ें लजक्षत‍जनाेि‍करन‍े में‍ुूायक‍ूजगा और‍पानी‍ज,ु‍े ुीजमत‍ुुं ाधनों‍पर‍दबाा‍कज‍कम‍करेगा।‍ूस्ट्तांतरणीय‍ जाकाु‍ऄजधकार‍(टीडीअर)‍का‍कायावन्ायन‍आु‍दजृ ष्टकजण‍में‍ुूायक‍ूजगा‍जज‍कायवनीजतक‍और‍अाश्यक‍ ऄाुंरचना‍ााले‍क्षेत्रों/गजलयारों‍के‍भीतर‍िूर‍के‍जाजभन्न‍जूस्ट्ुों‍ुे‍प्राप्त‍ऄप्रयुि ‍एफएअर‍कज‍केंदद्रत‍करत‍े ुएए‍ुंभा‍ूजगा। 1.3.4 स्ट्थान/भजू म‍के‍ुाोिम‍ईपयजग‍के‍जलए‍जमजश्रत‍ईपयजग‍जाकाु:‍आु‍यजजना‍में‍एकल-कायावत्मक‍भूजम‍ईपयजग‍ यजजना‍ुे‍ूटकर‍जमजश्रत‍ईपयजग‍ऄपनाने‍का‍एक‍बड़ा‍बदलाा‍दकया‍गया‍ू।, ‍भूजम-अधाररत‍जातरण‍ु‍े ूटकर‍जनर्नमत‍स्ट्थान‍अधाररत‍दजृ ष्टकजण‍जाकजुत‍ुएअ‍ू‍, जजुमें‍िूर‍भर‍म‍ें ुंगत‍ईपयजगों‍के‍जमश्रण‍और‍ ुू-ऄाजस्ट्थजत‍की‍्ास्ट्था‍ूजगी‍और‍जूां‍भानों‍के‍भीतर‍ार्टटकल‍जमजश्रत‍ईपयजग‍भी‍िाजमल‍ूजगा।‍यू‍14 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] मौजूदा‍क्षेत्रों‍के‍भीतर‍ुुजाधाओं‍की‍ईपलब्धता‍म‍ें ुुधार‍के‍जलए‍अाश्यक‍लचीलापन‍प्रदान‍करेगा, जजुु‍े भूजम‍का‍आष्टतम‍ईपयजग‍ुुजनजित‍ूजगा।‍जमजश्रत‍ईपयजग‍के‍जाकाु‍ुे‍यात्रा‍दरू ी‍म‍ें कमी‍अएगी, जीांत‍और‍ ुुरजक्षत‍ुाावजजनक‍क्षेत्र‍ुुजनजित‍ूज‍पाएंगे।‍ 1.3.5 जाकाु‍म‍ें जनजी‍क्षत्रे ‍की‍भागीदारी:‍ आु‍यजजना‍में‍जाजभन्न‍जूतधारकों‍की‍ुंयुि ‍कारवााइ‍(पूललग, जालयन, ुंयुि ‍यजजना‍और‍जनष्पादन)‍ुे‍जनजी‍क्षेत्र‍के‍नेतृत्ा‍म‍ें दकए‍जाने‍ााल‍े जाकाु‍कज‍बढ़ााा‍ददया‍गया।‍यू‍ एक‍मूत्ापूणव‍ु,द्धाजन्तक‍बदलाा‍ू‍,जूां‍नए‍क्षेत्रों‍के‍जाकाु‍के‍ुाथ-ुाथ‍पुराने‍ब्राईनफील्ड‍क्षेत्रों‍के‍ईत्थान‍ कज‍जनजी‍पूल‍ुे‍लाग‍ूदकया‍जाएगा। 1.3.6 केपीअइ-अधाररत‍यजजना‍की‍जनगरानी:‍आु‍यजजना‍में‍एक‍मजबूत‍जनगरानी‍ढांचा‍प्रदान‍दकया‍गया‍ू‍, जज‍ 20‍प्रमुख‍जनष्पादन‍ुंकेतकों‍के‍मा्यम‍ुे‍िूरी‍स्ट्तर‍के‍बड़े‍ईद्देश्यों‍की‍प्राजप्त‍का‍जायज़ा‍लने ा‍ुुुा्य‍ करेगी।‍आुुे‍जनगरानी‍का‍फजकु‍पररुंपजियों‍के‍जनमावण‍ुे‍ूटकर‍प्रभााों‍के‍अकलन‍पर‍अ‍जाएगा।‍ ईदाूरणाथव‍ुंस्ट्थाजपत‍दकए‍गए‍एुटीपी‍की‍जनगरानी‍के‍बजाय, यू‍यजजना‍जलाियों‍में‍प्रदीू ण‍की‍जस्ट्थजत‍ का‍अकलन‍करेगा।‍आुुे‍कायवनीजतयों‍और‍कारवााआयों‍के‍जलए‍ुमय-ुमय‍पर‍त्रुरट-ुुधार‍भी‍ुंभा‍ूज‍ पाएगा।‍(देख:ें‍पीएमइ)‍ खडं ‍1 पयााव रण पष्ठृ भजू म‍और‍प्रमखु ‍नीजतगत‍ुरजकार ददल्ली‍िूर‍का‍एक‍ऄजद्वतीय‍पयावारणीय‍पररदश्ृ य‍ू।, ‍एक‍ओर‍तज‍यमनु ा‍नदी, ऄरााली‍ररज, जलाियों, जंगलों‍अदद‍के‍ रूप‍म‍ें प्रचरु ‍और‍जाजाध‍पयााव रणीय‍ुंपदा‍ू;, और‍दुू री‍ओर, यू‍िूर‍लगातार‍पयावारण‍क्षरण‍और‍प्रदीू ण‍ज,ुी‍ ुमस्ट्याओं‍ुे‍जझू ता‍ू।, पयााव रणीय‍ुपं दा‍–‍ग्रीन‍एडं ‍ब्ल ू आु‍िूर‍ने‍ूररयाली‍बढ़ाने‍में‍तेजी‍ुे‍प्रगजत‍की‍ू‍, जज जपछले‍दज‍दिकों‍म,ें 2001‍के‍150‍ागव‍दकमी.‍ुे‍बढ़कर‍2017‍म‍ें 300‍ागव‍दकमी.‍तक‍लगभग‍दजगुनी‍ूज‍गइ‍ू।, ‍आु‍ुमय, यू‍प्राकृजतक‍और‍जनयजजजत‍ूररयाली‍के‍ुाथ‍देि‍के‍ुबुे‍ूरे‍ िूरों‍म‍ें िाजमल‍ू।, ‍ान‍जाभाग, जीएनुीटीडी‍के‍ऄनुुार, लगभग‍20%‍भूजम‍क्षेत्र‍ूररत‍कार‍के‍तूत‍ू।, ‍भारतीय‍ान‍ ऄजधजनयम, 1927‍के‍ागीकरण‍के‍अधार‍पर, ददल्ली‍म‍ें तीन‍प्रकार‍के‍ान‍ू।ैं ‍ररज‍लगभग‍7784‍ूक्े टेयर‍क्षेत्र‍म‍ें फ,ला‍ एक‍अरजक्षत‍ान‍ू‍, जज‍राष्ट्रीय‍राजधानी‍राज्य‍क्षेत्र‍ददल्ली‍का‍लगभग‍5.2%‍जूस्ट्ुा‍ब,ठता‍ू।, ‍ररज‍कज‍मुख्य‍यजजना‍म‍ें एक‍क्षेत्रीय‍पाकव‍के‍रूप‍म‍ें ागीकृत‍दकया‍गया‍ू‍, जूां‍बुएत‍ुीजमत‍जाकाु-कायव‍और‍गजतजाजधयों‍की‍ऄनुमजत‍दी‍गइ‍ू।ैं ‍ दुू री‍श्रणे ी‍म‍ें 26‍ुंरजक्षत‍ान‍िाजमल‍ू,ैं जजनका‍कुल‍क्षत्रे फल‍लगभग‍1658‍ूक्े टेयर‍ू।, ‍तीुरा, 40‍ऄागीकृत‍ान‍ (लगभग‍1090‍ूक्े टेयर) जजन्ू‍ेंान‍जाभाग, जीएनुीटीडी द्वारा‍िूरी‍ानों‍(जुटी‍फॉरेस्ट्ट)‍के‍रूप‍में‍बनाए‍रखा‍जाता‍ू।, ‍ आुके‍ऄजतररि , 18,000‍ुे‍ऄजधक‍पाकव‍और‍ईद्यान‍ू,ैं जज‍िूर‍के‍ूररत‍ऄनुपात‍कज‍बढ़ाते‍ू‍ैं और‍कुल‍खुल‍े क्षेत्र‍एा‍ं ूररत‍स्ट्थानों‍का‍कुल‍क्षेत्र‍30%‍के‍करीब‍तक‍ल‍े जात‍े ू।ैं ‍जा, ‍जाजाधता‍के‍ुंरक्षण‍और‍ुरु क्षा‍की‍अाश्यकता‍कज‍मूुूु‍ करते‍ुएए, डीडीए‍ने‍जाजभन्न‍क्षेत्रों‍में‍ुात‍ुमर्नपत‍ज,ा‍जाजाधता‍पाकव‍जाकजुत‍दकए‍ू‍ैं जज‍िूरी‍ज,ा‍जाजाधता‍के‍ ुंरक्षण‍के‍जलए‍एक‍मॉडल‍के‍रूप‍म‍ेंकाम‍करत‍ेू।ैं[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 15 ददल्ली‍में‍ूररत‍ुंपदा‍(ग्रीन‍एुेट)‍का‍जातरण‍ऄुमान‍ू,, जजुके‍‍पररणामस्ट्ारूप‍जाजभन्न‍क्षेत्रों‍में‍आुकी‍प,ठ‍ऄुमान‍ू।, ‍ कुछ‍ऐुे‍घन‍े क्षेत्रों‍में‍ूररयाली‍की‍मात्रा‍बढ़ाने‍की‍अाश्यकता‍ू‍, जूााँ‍प्रजत‍्जि ‍ूररयाली‍देि‍म‍ें ुबुे‍कम‍ू।, ‍लचता‍ का‍एक‍और‍क्षेत्र‍ूररयाली‍की‍गुणािा‍ू,, क्योंदक‍प्राकृजतक‍ूररयाली‍के‍क्षेत्र‍अक्रामक‍और‍जादेिी‍प्रजाजतयों‍के‍पड़े ों‍ु‍े जघरे‍ूजत‍े ू‍ैंजज‍भूजम‍कज‍ऄपघरटत‍करत‍े ू;ैं और‍आुजलए,‍आनके‍स्ट्थान‍पर देिी‍पड़े ‍लगाए‍जाने‍चाजूए। ददल्ली‍म‍ें नीली‍ुंपदा‍(ब्ल‍ू एुेट)‍भी‍प्रचुर‍ू।, ‍आनम‍ें ुबुे‍मूत्ापूणव‍यमुना‍नदी‍ू‍, जजुका‍िूर‍के‍ुाथ‍ऐजतूाजुक, ुांस्ट्कृजतक‍और‍अ्याजत्मक‍जुड़ाा‍ू।, ‍िूर‍में‍4000 ुे‍ऄजधक‍प्राकृजतक‍और‍जनर्नमत‍नाले‍ू,ैं जजनमें‍ुे‍200 प्राकृजतक‍ नाले‍नजफगढ़, रांु‍यमुना‍और‍बारापुल्ला‍के‍तीन‍जल‍जनकाुी‍बेजुन‍में‍फ,ले‍ुएए‍ू।ैं ‍ददल्ली‍पाकव‍और‍गाडवन‍ुजुायटी‍के‍ ऄनुुार‍ददल्ली‍म‍ें झीलों,‍तलय, ा‍और‍तालाबों‍के‍रूप‍म‍ें 900 ुे‍ऄजधक‍जलािय‍ू।ैं ‍ूालांदक, ऄजतक्रमण, प्रदीू ण‍और‍ जलाियों‍के‍प्राकृजतक‍रूप‍ु‍े ुूखने‍के‍कारण‍जपछले‍एक‍दिक‍में‍नीली‍ुंपदा‍का‍क्षेत्र‍कम‍ूज‍गया‍ू।, ‍नीली‍ुंपदा‍का‍ कायाकल्प‍करना‍िूर‍में‍प्रमुख‍अाश्यक‍कायों‍में‍ुे‍एक‍ू।, पयााव रणीय‍प्रदीू ण ददल्ली‍के‍जलए‍लचता‍का‍एक‍प्रमुख‍कारण‍पूरे‍ाी‍व म‍ें खराब‍ाायु‍गणु ािा‍ुूचकांक‍ू।, ‍ददल्ली‍म‍ें ााय‍ु प्रदीू ण‍का‍एक‍बड़ा‍ जूस्ट्ुा‍आुकी‍भौगजजलक‍ुीमाओं‍के‍बाूर‍ुे‍अता‍ू,, जजुका‍ऄथव‍ू‍, दक‍क्षेत्रीय‍स्ट्तर‍की‍कारवााइ‍की‍जानी‍अाश्यक‍ ूजगी।‍घरेलू‍(िूर‍के‍भीतर)‍पीएम‍2.5‍प्रदीू ण‍गर्नमयों‍और‍ुर्ददयों‍के‍दौरान‍क्रमिः‍26%‍और‍36%‍ू,, जजुमें‍ुे‍45%‍ धूल‍की‍ाजू‍ुे‍ू‍, (भारी‍ईद्यजग‍और‍लजक‍ईद्यम‍मंत्रालय)।‍यू‍जनमावण‍गजतजाजधयों‍के‍दौरान‍धलू ‍प्रबंधन‍की‍ अाश्यकता‍और‍घन‍े ान‍अारण‍कज‍बढ़ाने‍कज‍रेखांदकत‍करता‍ू।, ‍ददल्ली‍म‍ें कुल‍ााय‍ु प्रदीू ण‍का‍20%‍परराून‍क्षेत्र‍ु‍े अता‍ू।, ‍िेी‍ाायु‍प्रदीू ण‍घरों, कचरा‍जलान,े ईद्यजग‍और‍डीजल‍जनरेटर‍ुेट‍ुे‍ईत्ुर्नजत‍ूजता‍ू।, यमुना‍और‍ऄन्य‍जलाियों‍म‍ें जल‍प्रदीू ण‍के‍पररणामस्ट्ारूप‍जलीय‍जीान‍का‍लजप‍ूज‍गया‍ू‍, और‍जल‍पाररजस्ट्थजतकी‍ ऄस्ट्त-्स्ट्त‍ूज‍गइ‍ू।, ‍ददल्ली‍में‍ाज़ीराबाद‍ुे‍ओखला‍तक‍यमुना‍का‍22 दकलजमीटर‍लंबा‍जूस्ट्ुा, जज‍नदी‍की‍लंबाइ‍का‍ 2% ुे‍कम‍ू,, नदी‍में‍प्रदीू ण‍के‍लगभग‍70% के‍जलए‍जजम्मेदार‍ू।, ‍बारूमाुी‍नदी‍ूजन‍े के‍बााजूद, यमुना‍में‍िुष्क‍ मौुम‍में‍ाज़ीराबाद‍ुे‍अगे‍की‍ओर‍कजइ‍ताजा‍जल‍प्रााू‍नूीं‍ू।, ‍नदी‍में‍ूज‍रू‍े जल-प्रााू‍में‍नालों‍के‍मा्यम‍ुे‍बून‍े ााला‍ईपचाररत‍और‍ऄनुपचाररत‍ऄपजिष्ट‍जल‍िाजमल‍ू‍ैं जज‍नदी‍में‍जगरता‍ू।, ‍ुाजूबाबाद, िाूदरा, आंद्रापुरी, और‍ तेूखंड‍नालों‍ुजूत‍जज‍24‍मुख्य‍नाले‍नदी‍में‍ऄजधकांि‍प्रदजू ीत‍बजूाावू‍के‍जलए‍जजम्मेदार‍ूैं,‍ईन‍नालों‍की‍जनगरानी‍ डीपीुीुी‍द्वारा‍की‍जाती‍ू।, ‍नदी‍के‍प्रदीू ण‍कज‍रजकने‍की‍कायवनीजतयों‍में‍बाढ़‍के‍म,दानी‍क्षेत्रों‍कज‍भी‍्यान‍में‍रखना‍ ूजगा‍क्योंदक‍बाढ़‍के‍म,दानी‍क्षेत्रों‍में‍ऄजतक्रमण‍या‍प्रदीू णकारी‍गजतजाजध‍ुे‍पाररजस्ट्थजतक‍क्षजत‍और‍बाढ़‍के‍जजजखम‍की‍ ुंभााना‍बढ़‍जाती‍ू।, िजर‍का‍स्ट्तर‍डीपीुीुी‍द्वारा‍जनगरानी‍दकए‍गए‍ुभी‍स्ट्थानों‍पर‍ददन‍और‍रात‍दजनों‍के‍दौरान‍जनधावररत‍ुीमा‍ुे‍कूीं‍ ऄजधक‍ू।, ‍2017‍में‍ाल्डवााआड‍जूयररग‍आंडेक्ु‍द्वारा‍ददल्ली‍कज‍दजु नया‍का‍तीुरा‍ुबुे‍बड़ा‍िजर‍करने‍ााला‍िूर‍माना‍ गया‍था। िूर‍के‍जाजभन्न‍स्ट्थानों‍पर‍ाायु, जल‍और‍्ाजन‍प्रदीू ण‍की‍जनयजमत‍रूप‍ुे‍जनगरानी‍की‍जाती‍ू‍, और‍ुरकार‍द्वारा‍ प्रदीू ण, जज‍जन‍स्ट्ाास्ट््य‍कज‍प्रभाजात‍कर‍रूा‍ू,,‍कज‍दरू ‍करने‍के‍जलए‍कइ‍कायवनीजतयों‍कज‍ऄपनाया‍जा‍रूा‍ू।, ‍एक‍16 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] स्ट्ाच्छ,‍स्ट्ास्ट्थकर‍और‍ुमृद्धिाली‍प्राकृजतक‍ााताारण‍जलाायु‍पररातवन‍के‍प्रभाा‍कज‍दरू ‍करन,े ‍िूर‍कज‍प्रजतरजधक‍ बनाने‍और‍जनााजुयों‍कज‍ऄजधक‍रून‍ेयजग्य‍और‍रटकाउ‍अााु‍प्रदान‍करने‍म‍ेंमदद‍करेगा। पयावारण‍ुंरक्षण‍के‍जलए‍प्राुंजगक‍राष्ट्रीय‍और‍राज्य‍कानून‍और‍जाजनयम‍के‍ुाथ‍ददल्ली‍में‍पयावारण‍ुरं क्षण‍के‍जलए‍ कानूनी‍और‍ुंस्ट्थागत‍ढांचा‍मजबूत‍ू।, ‍जनयमों‍का‍कड़ाइ‍ुे‍प्रातवन‍कज‍ुुजनजित‍करने, ददल्ली‍म‍ें प्रदीू ण‍कज‍कम‍करन,े मात्रा, गुणािा‍और‍पुएचं ‍के‍मामले‍म‍ें ददल्ली‍के‍ग्रीन-ब्ल‍ू जूस्ट्ुे‍कज‍बढ़ान‍े ूते ‍ु त,यार‍की‍जान‍े ााली‍रणनीजतयों‍का‍ जमश्रण, ददल्ली‍की‍ुमृद्ध‍और‍जाजाध‍पाररजस्ट्थजतकीय‍धरजूर‍की‍रक्षा‍करेगा‍और‍आनके‍पजीण‍के‍जलए‍एक‍ुक्षम‍ ााताारण‍बनाएगा। आु‍भाग‍म‍ेंजनम्नजलजखत‍ऄ्याय‍िाजमल‍ू:ैं ENV1:‍प्रदीू ण‍और‍जलााय‍ुपररातनव ‍का‍ुमाधान‍ढूंढ़ना ENV2:‍ग्रीन-ब्ल‍ूआंफ्रास्ट्रक्चर‍कज‍बढ़ाना ऄ्याय कजड 2.0‍प्रदीू ण‍और‍जलााय‍ुपररातनव ‍का‍ुमाधान‍ढूंढ़ना ENV1 2.1.1 ाायु‍और‍जल‍प्रदीू ण‍का‍बड़ा‍भौगजजलक‍प्रभाा‍पड़ता‍ू।, ‍आन‍मुद्दों‍कज‍्ापक‍रूप‍ुे‍ुलु झाने‍के‍जलए‍बुए-राज्य‍ स्ट्तर‍पर‍प्रयाु‍दकए‍जाने‍की‍अाश्यकता‍ू।, ‍राष्ट्रीय‍राजधानी‍क्षेत्र‍(एनुीअर) के‍भीतर,‍ुदस्ट्य‍राज्यों‍कज‍ क्षेत्रीय‍यजजना‍के‍और‍पयावारण‍प्रदीू ण‍(रजकथाम‍और‍जनयंत्रण)‍प्राजधकरण‍के‍जनदिे ों‍का‍पालन‍करना‍मूत्ापणू ‍व ूजगा तथा‍प्रदीू ण‍एां‍जलाायु‍पररातवन‍का‍ुमाधान‍करने‍के‍जलए‍ुूयजगात्मक‍कायों‍कज‍िुरू‍करना‍ूजगा। 2.1.2 आुी‍प्रकार,‍यू‍ुुजनजित‍करके‍दक‍कजइ‍गर, -ुंुाजधत‍ऄपजिष्ट‍जल‍और‍औद्यजजगक‍ऄपजिष्ट‍जल‍जलाियों‍म‍ें नूीं‍छजड़ा‍जाता‍ू‍, जल‍प्रदीू ण‍कज‍कम‍दकया‍जा‍ुकता‍ू,,‍ुंबंजधत‍राज्य‍ुरकारों‍कज‍प्रदीू ण‍कज‍कम‍करन‍े की‍ ददिा‍में‍यमुना‍नदी‍म‍ें पयावप्त‍पयावारणीय‍प्रााू‍कज‍बनाए‍रखना‍चाजूए। 2.1.3 ुंबंजधत‍ राज्य‍ ुरकारों‍ कज‍ बायजमाु‍ जलने, प्रदीू णकारी‍ ईद्यजगों, ााूनों‍ के‍ ईत्ुजवन, ईंट-भट्टे, कजयला‍ अधाररत‍जबजली‍ुंयंत्र अदद‍ज,ुे‍प्रदीू ण‍के‍प्रमुख‍स्रजतों‍के‍जलए‍केंद्रीय‍प्रदीू ण‍जनयंत्रण‍बजडव‍(ुीपीुीबी)‍द्वारा‍ जनधावररत‍जाजनयमों‍और‍मानकों‍का‍पालन‍करना‍चाजूए। 2.1.4 ददल्ली‍कज‍प्रदीू ण‍के‍अतं ररक‍स्रजतों‍की‍ुमस्ट्या‍का‍ुमाधान‍करने‍और‍जन-स्ट्ाास्ट््य‍पर‍आुके‍प्रभााों‍कज‍कम‍ करने‍की‍अाश्यकता‍ू।, ‍प्रदीू ण‍के‍कारण‍और‍आुके‍िमन‍के‍ईपायों‍का‍जलाायु‍पररातवन‍के‍मुद्दे‍के‍ुाथ‍जनकट‍ ुंबंध‍ू‍, आुीजलए‍ऄजधकांि‍कायवनीजतयां‍आन‍दजनों‍क्षेत्रों‍के‍जलए‍ुू-लाभ‍प्रदान‍करेंगी।‍पयावारणीय‍मापदंडों‍म‍ें दीघवकाजलक‍ुुधार‍के‍जलए‍बूे तर‍ूररत‍अारण‍ूते ु‍और‍स्ट्ाच्छ‍ईद्यजगों, कम-काबवन‍प्रौद्यजजगदकयों, ुतत‍ अााजाूी, ूररत‍भानों‍अदद‍कज‍बढ़ााा‍देन‍े के‍जलए‍ऄनेक‍ुूायक‍कायवनीजतयों‍की‍अाश्यकता‍ूजगी।‍यू‍ ऄ्याय‍जनम्नजलजखत‍के‍जलए‍ुजु ाधा‍प्रदान‍करने‍के‍जलए‍एक‍बुए-क्षेत्रीय‍दजृ ष्टकजण‍प्रदान‍करता‍ू:,- i. स्ट्थानीय‍स्रजतों‍ुे‍ाायु,‍जल‍और‍्ाजन‍का‍कम‍प्रदीू ण ii. जलााय-ु ुंबंधी‍मुद्दों‍के‍प्रभााों‍का‍ुामना‍करन‍े की‍क्षमता‍में‍ुुधार 2.2 बूे तर‍ूररयाली‍के‍जलए‍कायनव ीजतया ाँ[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 17 2.2.1 ग्रीन‍एंड‍ब्ल‍ू ुंपदा‍ूाा, िजर, पानी‍के‍ुाथ-ुाथ‍जमट्टी‍के‍प्रदीू ण‍कज‍भी‍ुजख‍ुकती‍ू,, और‍जलाायु‍ पररातवन‍के‍प्रभााों‍कज‍कम‍करने‍में‍मदद‍कर‍‍ुकती‍ू‍, जु, े‍ाीाव‍के‍प,टनव‍कज‍जाजनयजमत‍करना, िूरी‍ गमी‍और‍बाढ़‍कज‍कम‍करना‍अदद।‍ददल्ली‍की‍ग्रीन-ब्लू‍ऄाुंरचना‍में‍ुुधार‍लान‍े के‍जलए‍्ापक‍ कायवनीजतयां‍और‍कारवााआयां‍ENV2 में‍ार्नणत‍ू।ैं ‍आुके‍ऄलााा, ददल्ली‍की‍पररजध‍पर‍ूररत‍बफर‍बनाए‍ रखने‍और‍क्षेत्रीय‍स्ट्तर‍के‍प्रदीू ण‍लुक‍बनान‍ेकी‍कायवनीजतयों‍का‍ाणवन‍DEV2 में‍दकया‍गया‍ू।, 2.3 ‍‍स्ट्ाच्छ‍अर्नथक‍गजतजाजधयों‍कज‍बढ़ााा‍दने ा 2.3.1 ऄनलु ग्नक‍1‍म‍ें दी‍गइ‍ुचू ी‍के‍ऄनुु ार‍प्रदीू णकारी‍ईद्यजगों‍कज‍ददल्ली‍के‍भीतर‍प्रचाजलत‍करने‍की‍ऄनुमजत‍ नूीं‍दी‍जाएगी।‍ुंबंजधत‍प्राजधकाररयों‍के‍जनदेिों‍के‍अधार‍पर, ुूची‍कज‍ुमय-ुमय‍पर‍जीएनुीटीडी और‍डीडीए द्वारा‍ऄद्यतन‍दकया‍जाएगा।‍ुभी‍ुंबंजधत‍एजेंजुयों‍द्वारा‍एक‍ुंयि ु ‍कायव‍यजजना‍जाकजुत‍की‍ जाएगी‍ तादक‍ यू‍ ुुजनजित‍ ूज‍ ुके‍ दक‍ ुभी‍ औद्यजजगक‍ क्षेत्रों‍ म‍ें मौजूदा‍ प्रदीू णकारी‍ ईद्यजगों‍ कज‍ स्ट्थानांतररत‍कर‍ददया‍जाए‍या‍ईनके‍स्ट्थान‍पर‍ऄन्य‍अर्नथक‍गजतजाजधयां‍िरूु ‍की‍जाएं।‍गर, -प्रदीू णकारी‍ अर्नथक‍गजतजाजधयां, ज,ुे‍दक‍ुेाा‍ईद्यजग‍और‍स्ट्ाच्छ‍जाजनमावण‍कज बढ़ााा‍ददया‍जाएगा‍और‍प्रजत्ुाजूत‍ दकया‍जाएगा‍ज,ुादक‍इुीओ‍में‍ार्नणत‍ू।, 2.4 ‍‍ााूनों‍ु‍ेूजन‍ेााल‍ेप्रदीू ण‍कज‍कम‍करना 2.4.1 आु‍िूर‍में‍ाायु‍और‍्ाजन‍प्रदीू ण‍दजनों‍में‍ााूनों‍ुे‍ूजने‍ााले‍प्रदीू ण‍का‍बड़ा‍यजगदान‍ू।, ‍द,जनक‍ााूनों‍ की‍यात्रा‍की‍ुंख्या‍कज‍कम‍करने‍और‍ुाावजजनक‍परराून‍एां‍ुदक्रय‍यात्रा‍मजड‍के‍ईपयजग‍कज‍बढ़ााा‍देन‍े के‍जलए‍जास्ट्ततृ ‍कायवनीजत‍MOB2‍और‍MOB3‍म‍ेंदी‍गइ‍ू।, ‍मुख्य‍कायवनीजतयों‍में‍य‍ेिाजमल‍ू:ैं i) कायवस्ट्थलों‍एां‍घरों‍कज‍परराून‍नेटाकव‍के‍करीब‍लाकर‍औुत‍यात्रा‍लंबाइ‍कज‍कम‍करने‍के‍जलए‍ और‍जमजश्रत-ईपयजग‍और‍रांजज़ट‍ओररएंरटड‍डेालपमेंट‍(टीओडी)‍कज‍ऄपनाना। ii) ुाावजजनक‍परराून‍नेटाकव‍म‍ें ुुधार‍करना‍और‍प्रजत्ुाजूत‍करना,‍बुए-मजडल‍ूब‍का‍जनमावण‍और‍ जाजनयामक‍ईपाय‍ज,ुे‍दक‍कंजेिन‍प्राआलुग‍अदद‍करना। iii) प,दल‍चलन,े ुाआदकल‍चलान‍े और‍आल,जक्रक‍ााूनों‍के‍ऄाुंरचना‍(इाी‍आंफ्रास्ट्रक्चर)‍म‍ें ुुधार‍ करके‍ूररत‍अाा-जाूी‍और‍ुदक्रय‍यात्रा‍ुाधनों‍कज‍बढ़ााा‍देना। iv) ुाावजजनक‍परराून‍के‍ुाथ-ुाथ‍अइपीटी‍और‍ऄन्य‍ुाझा‍ुाधनों‍के‍जलए‍ईपयुि ‍प्रजत्ुाून‍देकर‍ ूररत‍ईंधन‍ऄपनाना। 2.5 ऄन्य‍कायनव ीजतया ाँ 2.5.1 जलाियों‍और‍भूजमगत‍जल‍के‍प्रदीू ण‍कज‍प्राथजमकता‍देकर‍ुमाधान‍दकया‍जाएगाः i) यमुना‍नदी और‍जाजभन्न‍प्राकृजतक‍नालों, झीलों‍और‍बााजलयों‍के‍ुंबंध‍म‍ें जल‍गुणािा‍म‍ें ुुधार‍ करने‍का‍कायव‍िुरू‍दकया‍जाएगा‍जजुे‍अुपाु‍के‍जाकाु-कायव‍ुे‍जनकलने‍ााले‍ऄनपु चाररत‍ ऄपजिष्ट‍ जल‍ के‍ बजूाावू‍ पर‍ रजक‍ लगाकर‍ दकया‍ जाएगा।‍ ुम्बजन्धत‍ एजेंजुयां‍ आु‍ बारे‍ म‍ें पररयजजना‍कारवााइ‍कज‍लाग‍ूकरेंगी।‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍18 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ii) ददल्ली‍जल‍बजड‍व (डीजेबी)‍लुचाइ‍और‍बाढ़‍जनयंत्रण‍जाभाग‍(अइएंडएफुी)‍के‍ुाथ‍ुमन्ाय‍ करके‍यू‍ुुजनजित‍करन‍े के‍जलए‍कदम‍ईठाएगं े‍दक‍जूााँ‍तक‍्ाूायव‍ूज,‍प्राकृजतक‍ग,र-मिीनीकृत‍ प्रणाजलयों‍का‍ईपयजग‍करके‍मौजूदा‍प्रदीू कों‍कज‍ुमयबद्ध‍तरीके‍ुे‍ूटाया‍जाए। iii) ददल्ली‍प्रदीू ण‍जनयंत्रण‍ुजमजत‍(डीपीुीुी) द्वारा‍प्रयजज्य‍प्रदक्रयाओं‍और‍प्रजटजकॉल‍के‍ऄनुुार‍परू े‍ नाले‍की‍ुमय-ुमय‍पर‍जल-गणु ािा‍के‍ुंबंध‍में‍जनगरानी‍की‍जाएगी। 2.5.2 ठजु‍ऄपजिष्ट‍के‍ग,र-जाजनयजमत‍डंजपग‍और‍जनपटान‍ु‍े भूजम‍और‍जल‍प्रदीू ण‍ूजता‍ू,,‍आन्ू‍ें जनम्नजलजखत‍ कायवनीजतयों‍द्वारा‍जाजनयजमत‍दकया‍जाएगा‍(दखे :ें‍INF2): i) िूर‍की‍दकुी‍भी‍पयावारणीय‍ुंपदा‍में‍ठजु‍और‍तरल‍कचरे‍की‍डंलपग‍कज‍ुंबंजधत‍एजेंजुयों‍द्वारा‍ ुख्ती‍ुे‍जनजीद्ध‍दकया‍जाएगा‍और‍दंजडत‍दकया‍जाएगा। ii) स्रजत‍लबद‍ुपर‍कचरे‍का‍पथृ क्करण‍दकया‍जाएगा। iii) स्ट्थानीय‍जनकाय‍खुल‍े क्षेत्रों‍म‍ें अयजजजत‍बड़े‍ुाावजजनक‍ुमारजूों‍और‍त्यौूारों‍म‍ें ईत्पन्न‍कचरे‍के‍ प्रबंधन‍के‍जलए‍एक‍तंत्र‍जाकजुत‍करेंगे। iv) कचरे‍के‍पनु :‍ईपयजग‍और‍रीुाआलक्लग‍प्रथाओं‍कज‍जाजभन्न‍जाकाु‍यजजनाओं‍का‍जूस्ट्ुा‍बनाकर‍ मुख्यधारा‍म‍ेंलाया‍जाएगा। 2.5.3 देिज‍पीएम‍2.5‍का‍45%‍धलू ‍के‍कारण‍ू।, ‍जनमावण‍ईद्यजग‍आु‍मुद्दे‍का‍ुमाधान‍करन‍े म‍ें प्रमुख‍भूजमका‍ जनभा‍ ुकता‍ ू।, ‍ यू‍ देखत‍े ुएए‍ दक‍ काफी‍ भान‍ जनमावण‍ काय‍व लडैं ‍ पूललग‍ क्षेत्रों‍ म‍ें और‍ पनु ःुुधार‍ पररयजजनाओं‍के‍ऄंतगवत‍दकए‍जाने‍की‍ुंभााना‍ू,,‍जनम्नजलजखत‍प्रााधान‍लाग‍ूूोंग:े i) ुभी‍जाकाु‍पररयजजनाएं‍जनमावण‍ुामग्री‍और‍ुीएंडडी‍कचरे‍कज‍ुंभालन‍े में‍धूल‍कम‍करने‍के‍ ईपायों‍का‍कड़ाइ‍ुे‍ऄनुपालन‍करेंगी।‍ुीपीुीबी‍ऄथाा‍दकुी‍ऄन्य‍ददिा-जनदेिों‍के‍ऄनुुार‍धलू ‍ प्रबंधन‍यजजना‍प्रस्ट्ततु ‍करेंगी।‍कायावन्ायन‍ुुजनजित‍करने‍के‍जलए‍स्ट्थानीय‍जनकायों‍द्वारा‍जनमावण‍ स्ट्थलों‍की‍जनयजमत‍रूप‍ुे‍जनगरानी‍की‍जाएगी। 2.5.4 जनम्नजलजखत‍िमन‍ईपाय‍िूर‍भर‍में‍ऄपनाए‍जाएंगे और‍िूर‍में‍जचजननत‍प्रदीू ण, बाढ़‍या‍तापन‍के‍मुख्य‍ स्ट्थानों‍(ूॉटस्ट्पॉट)‍के‍भीतर‍प्राथजमकता‍के‍अधार‍पर‍लाग‍ूदकए‍जाएंगे: i) जूां‍भी‍ुंभा‍ूज,‍ाूां‍फुटपाथ, ुड़कों‍और‍छतों‍का‍जनमाणव /‍लेपन‍ईच्च‍प्रकािानुपात‍(एलबीडज)‍ ााली‍ूल्के‍रंग‍की‍ुामग्री‍के‍ुाथ‍दकया‍जाएगा।‍यू‍स्ट्थानीय‍तापमान‍कज‍3-5‍जडग्री‍तक‍कम‍कर‍ ुकता‍ू।, ii) ुड़क‍भाग‍में‍ाायु‍और‍्ाजन‍प्रदीू ण‍कज‍कम‍करने‍के‍जलए‍ईपयुि ‍पड़े ‍और‍बफर‍िाजमल‍ूोंग।े ‍ जल-भराा‍कज‍कम‍करने‍के‍जलए‍ुतत‍िूरी‍जल‍जनकाुी‍घटकों‍ज,ुे‍ज,ा-झरु मुट‍(बायजस्ट्ाेल), रेन‍ गाडेन‍अदद‍(फ्लाइओार‍के‍नीचे‍ऄाजिष्ट‍क्षेत्रों‍ुजूत)‍कज‍भी‍िाजमल‍दकया‍जाएगा। iii) पेड़ों‍और‍पौधों‍की‍मलू ‍प्रजाजतयां‍जज‍प्रदीू ण‍दफल्टर‍के‍रूप‍में‍कायव‍करती‍ूैं,‍ईन्ू‍ें ूररयाली‍बढ़ाने‍ की‍जाजभन्न‍पूलों‍म‍ें िाजमल‍दकया‍जाएगा।‍जमयाााकी‍ान, स्ट्मॉग‍ऄािजीण‍टॉार‍और‍ऄन्य‍ तकनीकी‍ुमाधान‍भी‍प्रदीू ण‍के‍मुख्य‍स्ट्थानों‍म‍ेंप्रदीू ण‍कज‍कम‍करन‍ेके‍जलए‍ऄपनाए‍जा‍ुकते‍ू।, iv) ईच्च‍ग्रीन-ब्लू‍कारक‍(जीबीएफ) मान‍ऄथावत‍जचरकाजलक‍प्रदीू ण‍स्ट्थान‍(क्रजजनक‍पॉल्यिू न‍ूॉटस्ट्पॉट)‍ के‍रूप‍में‍पूचाने‍गए‍क्षेत्रों‍म‍ें भााी‍जाकाु‍के‍जलए‍ईच्चतर‍ूररयाली-ऄपेक्षाएं‍जनधावररत‍की‍जा‍ ुकती‍ू।, ‍आुी‍तरू, िूर‍म‍ें बाढ़‍के‍ूॉटस्ट्पॉट्‍के‍रूप‍म‍ें पूचाने‍गए‍क्षेत्रों‍म‍ें तल‍कारेज‍कज‍ुीजमत‍ दकया‍जा‍ुकता‍ू‍,और‍ुजखने‍ााली‍ुतू‍ुंबंधी‍ऄपेक्षाओं‍कज‍बढ़ाया‍जा‍ुकता‍ू।,[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 19 v) ुभी‍नए‍जाकाु-कायों‍में‍ऄस्ट्पताल, स्ट्कूल, ाृद्धाश्रम‍अदद‍ज,ुी‍ुुजाधाएं‍तेज़‍गजत‍ााले‍यातायात‍ गजलयारों‍ुे‍दरू ‍जनर्नमत‍दकए‍जाएंगे। vi) ्ाजन‍प्रदीू ण‍कायव‍यजजना‍जीएनुीटीडी द्वारा‍्ाजन‍प्रदीू ण‍(जाजनयमन‍और‍जनयंत्रण)‍जनयम‍ (2000) या‍ुरकार‍द्वारा‍ुुझाए‍गए‍दकुी‍ऄन्य‍मागवदिवन‍ढाचं े‍के‍अधार‍पर‍त,यार‍और‍कायावजन्ात‍ की‍जा‍ुकती‍ू।, ‍िूर‍में‍्ाजन‍प्रदीू ण‍जनगरानी‍केंद्रों‍की‍ुंख्या‍और‍प्रुार‍कज‍बढ़ाया‍जा‍ुकता‍ू‍, और‍्ाजन‍प्रदीू ण‍केंद्रों‍में‍तत्काल‍राूत‍के‍जलए‍िजर‍में‍कमी‍के‍ईपयुि ‍ईपाय‍(ाृक्षारजपण‍या‍िजर‍ ऄारजध)‍दकए‍जा‍ुकत‍े ू।ैं 2.5.5 डीपीुीुी द्वारा‍पयावारणीय‍मापदंडों‍पर‍नज़र‍रखने‍के‍जलए‍एक‍मजबूत‍जनगरानी‍ढांचा‍स्ट्थाजपत‍दकया‍ जा‍ुकता‍ू:, i) आु‍तरू‍की‍जनगरानी‍ुे‍एकत्र‍दकए‍गए‍डेटा‍कज‍जनयजमत‍रूप‍ु‍े ऑनलाआन‍प्लेटफामों‍पर‍ प्रकाजित‍दकया‍जाएगा‍तादक‍आन‍मुद्दों‍के‍बारे‍में‍जागरूकता‍बढ़ाइ‍जा‍ुके।‍ाायु‍प्रदीू ण‍और‍िजर‍ के‍स्ट्तर‍ज,ु‍े मापदंडों,‍ूररत‍क्षत्रे ों‍और‍जलाियों‍अदद‍म‍ें ठजु‍और‍तरल‍कचरे‍की‍ऄा,ध‍डंलपग‍पर‍ ुूचना‍ऄनेकानेक‍स्रजतों‍ुे‍प्राप्त‍की‍जा‍ुकती‍ू।, ‍यू‍डेटा‍मॉजनटररग‍स्ट्टेिनों‍ुे‍प्राप्त‍ुाक्ष्यों‍में‍ ुूायक‍ूज‍ुकता‍ू‍, और‍प्रदीू ण‍के‍स्रजतों‍और‍ऄपेजक्षत‍कारवााइ‍की‍एक‍ुूक्ष्म‍स्ट्थाजनक‍ुमझ‍द‍े ुकता‍ू।, 2.5.6 प्रदीू ण‍के‍प्रबंधन‍म‍ें नागररक‍और‍ऄन्य‍जूतधारक‍स्ट्थानीय‍स्ट्तर‍पर‍मूत्ापूण‍व भूजमका‍जनभाते‍ू।ैं ‍ुभी‍ ुंबंजधत‍एजेंजुयां‍जागरूकता‍बढ़ाने‍के‍जलए‍और‍पयावप्त‍और‍जािुनीय‍जानकारी‍प्रदान‍करन‍े के‍जलए‍ कदम‍ईठाएंगी‍तादक‍जूतधारकों‍कज‍कायावन्ायन‍भागीदारों‍के‍रूप‍म‍ेंिाजमल‍दकया‍जा‍ुके। --- x --- x ---- x --- x --- ऄ्याय कजड ENV2 3.0 ग्रीन-ब्ल‍ूआंफ्रास्ट्रक्चर‍कज‍बढ़ाना 3.1.1 ददल्ली‍देि‍के‍ुबुे‍ूरे‍िूरों‍में‍ुे‍एक‍ू‍,जूां‍ऄरााली‍ररज, यमुना, ानों,‍धाराओं, नालों, झीलों‍और‍अद्रभव ूजम‍ तथा ुाथ‍ूी‍माना‍जनर्नमत‍ुंपदा‍ज,ुे‍पाकव, म,दान, तालाब, बााजलयों‍अदद के‍रूप‍में‍प्रचरु ‍मात्रा‍में‍प्राकृजतक‍ ‘ग्रीन‍ुम्पदा’‍और‍‘ब्लू‍ुम्पदा’‍जाद्यमान‍ू।, ‍ुमस्ट्त‍‘ग्रीन‍एंड‍ ब्लू‍ुम्पदा’‍और‍ईनका‍ऄतं ःुबं ंजधत‍नेटाकव‍िूर‍ की‍एक‍अाश्यक‍बुजनयादी‍ढाचं ा‍परत‍ू‍, जज‍नागररकों‍कज‍अनंद‍के‍जलए‍खलु ी‍जगू‍प्रदान‍करता‍ू‍, और‍जा, ‍ जाजाधता, लघु‍जलाायु-क्षेत्र‍(माआक्रजक्लाआमेट)‍एां‍बाढ़‍प्रबंधन‍के‍जलए‍बड़े‍नेटाकव‍लाभ‍भी‍देता‍ू।, ‍मुख्य‍ यजजना‍म‍ें आु‍िूर‍म‍ें ‘ग्रीन-ब्ल‍ू आंफ्रास्ट्रक्चर’‍के‍एकीकृत‍प्रबधं न‍के‍जलए‍एक‍रूपरेखा‍दी‍गइ‍ू‍, जजुमें‍ाृजद्ध‍की‍ पररकल्पना‍की‍गइ‍ू:, i) प्राकृजतक‍ग्रीन-ब्ल‍ूुम्पदा‍के‍तूत‍अने‍ााल‍ेकुल‍क्षेत्र। ii) िूर‍म‍ेंनइ‍पररयजजनाओं‍के‍ऄतं गवत‍जनयजजजत‍ूररत‍स्ट्थान। 3.1.2 प्लान‍ऄाजध‍में‍जनम्नजलजखत‍चार-अयामी‍दजृ ष्टकजण‍लागू‍दकया‍जाएगा, जजुमें‍मौजूदा‍प्राकृजतक‍ुंपदाओं‍कज‍ ुंरजक्षत‍और‍ुंार्नधत‍करने,‍िूरी-स्ट्तर‍पर‍नइ‍ुंपदाएाँ‍बनाने‍और‍जनर्नमत‍पयावारण‍के‍भीतर‍ग्रीन-ब्लू‍ऄनुपात‍ में‍ाृजद्ध‍करन‍े के‍ुजम्मजलत‍प्रयाु‍ूोंगे।‍आुुे‍जनम्नजलजखत‍लाभ‍प्राप्त‍ूोंगेः20 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] i) पयावारणीय‍–‍प्रजत‍्जि ‍ऄजधक‍ूररयाली, ुमृद्ध‍ज,ा‍जाजाधता, कम‍तापन‍और‍बाढ़, प्रदीू ण‍में‍कमी, जलाायु‍पररातवन‍के‍प्रजत‍बेूतर‍प्रजतरजधकता; ii) स्ट्ाास्ट््य‍-‍रूने‍का‍स्ट्ाच्छ‍ााताारण, ुदक्रय‍जीान‍ि,ली, बीमाररयों‍और‍रजगों‍(मानजुक‍स्ट्ाास्ट््य‍ ुजूत)‍का‍कम‍बजझ‍और‍जीान‍की‍गुणािा‍में‍ुुधार; iii) ुामाजजक-ुांस्ट्कृजतक‍–‍ऄजधक‍पयावारणीय‍जागरूकता‍और‍प्रकृजत‍के‍ुाथ‍लजगों‍का‍घजनष्ठ‍ुंबंध, अराम, िारीररक‍और‍ुामाजजक‍गजतजाजध‍के‍जलए‍स्ट्थानों‍की‍ईपलब्धता; iv) अर्नथक‍-‍जनाेि‍गतं ्‍के‍रूप‍में‍ऄजधक‍अकीणव , बेूतर‍ईत्पादकता, स्ट्ाास्ट््य‍देखभाल‍पर‍कम‍खचव, िूरी‍खेती‍ज,ुी‍ूररत‍ऄथव्ास्ट्थाओं‍कज‍बढ़ााा‍देना‍अदद। 3.2 प्राकृजतक‍ग्रीन‍एडं ‍ब्ल‍ूुम्पदा‍का‍ुरं क्षण‍और‍ुधु ार 3.2.1 िूर‍म‍ें कइ‍प्राकृजतक‍ुंपदाए‍ं ‍ज,ुे‍नदी, ररज, नाल‍े और‍जलािय‍‍पूले‍ुे‍ूी‍ुंबंजधत‍एजेंजुयों‍द्वारा‍ 'ुंरजक्षत' या‍'अरजक्षत' क्षेत्रों‍के‍रूप‍म‍ेंऄजधुूजचत‍दकए‍गए‍ू।ैं i) ‘खंड‍3.5.1‍में‍ार्नणत‍ग्रीन-ब्ल‍ूआंफ्रास्ट्रक्चर‍के‍डेटाबेु‍के‍ जलए‍ जीएनुीटीडी‍ और‍ स्ट्थानीय‍ जनकायों‍द्वारा‍डीडीए‍कज‍पररुीमन‍ुीमाओं‍के‍ुाथ‍‘पयावारण‍ुंरक्षण‍के‍तूत‍क्षेत्र’‍प्रदान‍दकया‍ जाएगा।‍यमुना‍के‍मामले‍म,ें पररुीमन‍में‍एक‍ ुक्षम‍प्राजधकारी‍द्वारा‍ऄजधदेजित‍25‍ाी‍व में‍1‍ बाढ़‍प्रभाजात‍म,दान‍या‍दकुी‍ऄन्य‍मानदडं ‍कज‍िाजमल‍दकया‍जाएगा। ii) ऐुे‍स्ट्थलों‍के‍भीतर‍केाल‍ुीजमत‍जाकाु‍की‍ऄनुमजत‍दी‍ जाएगी‍(दखे :ें‍DCN)। 3.2.2 ऐुे‍स्ट्थलों‍के‍ुरं क्षण‍और‍ुंाधवन‍के‍जलए‍्ापक‍कायवनीजतयों‍कज‍लाग‍ूदकया‍जाएगा। क) चारदीाारी‍की‍ुरु क्षा: ुंबंजधत‍एजेंजुयों‍द्वारा‍जनधावररत‍बाड़‍या‍चारदीाारी का‍जनमावण‍करके‍ ऄथाा‍प,दल/ुाआदकल‍पथ‍की‍्ास्ट्था‍करके। i) चारदीाारी‍के‍जाकल्प‍के‍रूप‍में‍पयावारण-ऄनुकूल‍ुामग्री / तकनीक‍ज,ुे‍दक‍ानस्ट्पजत‍के‍ ुाथ‍ऄथ-व बर्ममग‍का‍यथाुंभा‍ईपयजग‍करना; ii) ऐुे‍स्ट्थानों‍पर‍बाड़/दीाारें‍बनाने‍ुे‍बचा‍जाएगा‍जूां‍ुीमाएं‍स्ट्पष्टत:‍ुड़कों, बंध‍या‍ प्राकृजतक‍रूपों‍द्वारा‍ुीमांदकत‍ूों। ख) ुपं दा‍की‍गणु ािा‍म‍ेंुधु ार: i) अक्रामक‍और‍जादेिी‍प्रजाजतयों‍के‍ऐुे‍पेड़ों‍की‍ाृजद्ध‍पर‍रजक‍लगाना‍जज‍भूजम‍क्षरण‍करत‍े ू‍ैं या‍जल‍पाररजस्ट्थजतकी‍कज‍खराब‍करते‍ू।ैं ‍आनके‍स्ट्थान‍पर‍स्ट्ादेिी‍ानस्ट्पजतयों‍और‍जीाों‍ कज‍रखा‍जाएगा‍जजन्ू‍ें पानी‍की‍कम‍अाश्यकता‍ूजती‍ू‍, और/या‍प्रदीू ण‍जनयंत्रण‍के‍जलए‍ प्रभााी‍ू‍ैं तथा‍जज‍जलाियों‍की‍जस्ट्थजत‍कज‍बूाल‍करने‍के‍जलए‍ईपयुि ‍जलीय‍प्रजाजतया‍ं ू।ैं ii) जचजननत‍क्षेत्रों‍में‍्ाूायवता‍के‍ऄनुुार‍ानरजपण‍और‍ाृक्ष‍प्रत्यारजपण‍िरूु ‍दकया‍जा‍ ुकता‍ू;, यू‍ुुजनजित‍करत‍े ुएए‍दक‍दिे ी‍प्रजाजतयां‍क्षेत्र‍और‍जमट्टी‍की‍जािेीताओं‍के‍ ऄनुकूल‍ू।ैं iii) ुभी‍पयावारणीय‍ुंपदाओं‍की‍जस्ट्थजत‍की‍ुमय-ुमय‍पर‍जनगरानी‍की‍जाएगी‍और‍ुंबंजधत‍ एजेंजुयों‍द्वारा‍ुंपदाओं‍कज‍प्रदीू ण-मुि ‍रखन‍े के‍जलए‍कदम‍ईठाए‍जाएंग‍े और‍यदद‍कजइ‍ कमी‍ूज, तज‍ईन्ू‍ेंदरू ‍दकया‍जाएगा।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 21 iv) यमुना‍और‍ऄरााली‍ररज‍के‍पाररजस्ट्थजतक‍तंत्र‍के‍ुंरक्षण‍और‍परररक्षण‍के‍जलए‍ज,ा‍ जाजाधता‍कज‍बढ़ाना। v) ददल्ली‍जल‍बजडव,‍अइएंडएफुी‍और‍ऄन्य‍ुंबंजधत‍एजेंजुयां‍िूर‍में‍नदी‍और‍झीलों‍की‍ कायाकल्प-प्रदक्रया‍कज‍लाग‍ू करेंगी।‍ददल्ली‍जल‍बजड‍व यू‍ुुजनजित‍करेगा‍दक‍जनधावररत‍ गुणािा‍मानकों‍के‍ऄनुुार, पयावप्त‍मात्रा‍में‍ईपचाररत ऄपजिष्ट‍जल‍कज‍नदी‍म‍ें जडस्ट्चाज‍व दकया‍जाए‍तादक‍जनधावररत‍पयावारणीय‍प्रााू‍कज‍बनाए‍रखा‍जा‍ुके‍और‍ईपचाररत ऄपजिष्ट‍जल‍कज‍झील/जलािय‍की‍कायाकल्प‍पररयजजनाओं‍के‍जलए‍ईपलब्ध‍कराया‍जा‍ ुके। ग) प्रकृजत‍के‍ुाथ‍लजगों‍का‍जड़ु ाा‍बढ़ाना:‍प्राकृजतक‍पयावारण‍कज‍खतरे‍में‍डाल‍े जबना‍जाकजुत‍ मनजरंजन‍स्ट्थलों‍तक‍ुाावजजनक‍पुएचाँ ‍की‍ऄनुमजत‍दी‍जाएगी। i) जाजिष्ट‍क्षेत्रों‍और‍मागों‍कज‍'आंटरेजक्टा‍जजन' के‍रूप‍में‍जचजननत‍दकया‍जाएगा। ii) आन‍ क्षेत्रों‍ के‍ भीतर‍ ुदक्रय/जनजष्क्रय‍ मनजरंजन, ्ायाम/‍ यजग, प्रकृजत‍ कक्षाए,ं पयावारण‍ ऄनुुंधान, जपकजनक, जिजार, ज,ा‍जाजाधता‍पयवटन‍अदद‍ज,ुे‍ऄस्ट्थायी‍गजतजाजधयों‍की‍ ऄनुमजत‍दी‍जाएगी।‍िौचालय, पेयजल‍फव्ाारे, जाश्राम‍स्ट्थल, अगंतुक‍ुूचना‍केंद्र‍अदद‍ज,ुी‍ ुुजाधाएं, जूां‍भी‍अाश्यक/ुंभा‍ूज, प्रदान‍की‍जाएंगी। iii) पाररजस्ट्थजतक‍दजृष्ट‍ुे‍दकुी‍भी‍मूत्ापूणव/ुंाेदनिील‍जािेीताओं‍ ााले‍ या‍ क्षेत्रों‍ (चट्टानी‍बजूाावू,‍जलािय, नीड़न‍क्षेत्र‍अदद)‍में‍जनता‍कज‍प्राेि‍की‍ऄनुमजत‍नूीं‍दी‍ जाएगी। 3.2.3 यमनु ा‍और‍ईुके‍बाढ़‍के‍मद, ानों‍के‍कायाकल्प‍के‍जलए‍जािीे ‍पूल:‍दकुी‍भी‍नदी‍िूर‍की‍तरू, ददल्ली‍का‍ आजतूाु‍और‍ुांस्ट्कृजतक‍लजकाचार‍यमुना‍और‍आुके‍बाढ़-म,दानों‍ुे‍जुड़ा‍ुएअ‍ू।, ‍दद.जा.प्रा.‍द्वारा‍त,यार‍ और‍ुंचाजलत‍्ापक‍नदी‍जाकाु‍यजजना‍एक‍बुए-एजेंुी‍पूल‍ूजगी‍जज‍केाल‍ुीजमत‍जाकाु-कायव‍के‍ ुाथ‍बाढ़-म,दानों‍के‍ुंरक्षण‍का‍मागवदिनव ‍करेगी। i) नदी‍के‍ुमस्ट्त‍दकनारे‍के‍ुाथ-ुाथ‍जूां‍भी‍ुंभा‍ूज,‍300‍मीटर‍चौड़ा‍ूररत‍बफर‍बनाया‍जा‍ ुकता‍ू।, ‍जंगली‍घाु‍या‍ऄन्य‍ईपयुि ‍ानस्ट्पजत‍भू-अारण‍नदी‍के‍दकनारे‍ुे‍25-30‍मीटर‍तक‍ लगाया‍जाएगा‍और‍आु‍ग्रीन‍बल्े ट‍के‍ऄलााा‍भी‍पेड़‍लगाए‍जा‍ुकते‍ू।, ii) नदी-जन‍जुड़ाा‍कज‍प्रजत्ुाजूत‍दकया‍जाएगा।‍ऐुा‍ुाावजजनक‍ईपयजग‍के‍जलए‍तटबंधों‍के‍ुाथ-ुाथ‍ 75-100‍मीटर‍चौड़े‍ूररत-पथ‍जाकजुत‍करके‍दकया‍जाएगा‍जजुमें‍नदी‍के‍पाु‍ुाआदकल‍चलान‍े और‍प,दल‍चलने‍के‍रास्ट्त‍े तथा‍जनजष्क्रय‍गजतजाजधयों‍के‍जलए‍ऄन्य‍स्ट्थानों‍की‍्ास्ट्था‍करके‍दकया‍ जाएगा।‍बाढ़-म,दानों‍में‍दकुी‍भी‍स्ट्थायी‍जनमावण‍की‍ऄनुमजत‍नूीं‍दी‍जाएगी।‍(देखें:‍DCN) iii) ुामाजजक-ुांुकृजतक‍गजतजाजधयों‍की‍केाल‍जािेी‍रूप‍ु‍े जचजननत‍स्ट्थानों‍म‍ें ूी‍ऄनुमजत‍दी‍ जाएगी।‍बाढ़‍के‍म,दानों‍म‍ें कृजी-कायव‍की‍ऄनुमजत‍देन‍े के‍जलए‍जाजिष्ट‍स्ट्थानों‍की‍पूचान‍की‍जा‍ ुकती‍ू।, ‍नदी‍पर‍आन‍गजतजाजधयों‍के‍दकुी‍भी‍प्रजतकूल‍प्रभाा‍कज‍ईजचत‍जाजनयमन‍द्वारा‍कम‍ दकया‍जाएगा‍ज,ुेदक‍पूजा‍ुामग्री‍के‍जनपटान, मूर्नतयों‍के‍जाुजवन, ईावरकों‍के‍ईपयजग, कचरा‍ जनपटान‍अदद‍के‍ुंबंध‍म‍ें जाजनयमन।‍केाल‍घाट‍ज,ुे‍ुाावजजनक‍क्षेत्रों‍में‍ुीजमत‍जनमावण‍की‍ ऄनुमजत‍दी‍जाएगी।‍ऄा,ध‍जनमावण,‍बाढ़-म,दानों‍और‍नदी‍म ें ुीाेज‍या‍मलबा‍डालने‍कज‍रजकने‍के‍ जलए‍ाास्ट्तजाक‍तौर‍पर‍और‍ुीुीटीाी‍जनगरानी‍द्वारा‍जनयजमत‍जनगरानी‍ुुजनजित‍की‍जाएगी।‍ नदी‍में‍ऄनुपचाररत‍ुीाेज/ऄपजिष्ट‍जल‍जनकाुी‍की‍ऄनुमजत‍नूीं‍ूजगी।‍(देख:ें‍INF1) iv) पाररजस्ट्थजतक-तंत्र‍(आकज-जुस्ट्टम)‍का‍पुनरुद्धार‍मौजूदा‍अद्र‍व भूजम‍(ाेटलडैं )‍की‍गाद‍जनकालकर‍और‍ ईन्ू‍ें बाढ़‍का‍पानी‍ग्रूण‍करने‍के‍ जलए‍त,यार‍करके‍तथा‍नए‍ाटे लैंड‍जाकजुत‍करके‍एां‍भंडारण‍ बेजुनों‍में‍मौजूदा‍गड्ढों‍कज‍और‍गूरा‍करके‍दकया‍जाएगा।22 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] v) ुंबंजधत‍एजेंजुयां‍यमुना‍और‍आुके‍बाढ़‍के‍म,दानों‍के‍बारे‍में‍जन‍जागरूकता‍बढ़ाने‍के‍जलए‍जाजभन्न‍ तरीकों‍और‍मीजडया‍का‍ईपयजग‍करेंगी। 3.2.4 पयााव रणीय-ुास्ट्ं कृजतक‍ुपं दाओं‍का‍ुरं क्षण: ददल्ली‍में‍कइ‍ऐजतूाजुक‍स्ट्मारक‍ू‍ैं जज‍ग्रीन‍एंड‍ब्लू‍ुंपदा‍के‍ भीतर‍या‍जनकट‍जस्ट्थत‍ू।ैं ‍परु ातत्ा‍पाकव‍ऐुी‍पयावारणीय-ुांस्ट्कृजतक‍ुंपदा‍का‍ुबुे‍ऄच्छा‍ईदाूरण‍ू।ैं ‍ ऐुी‍पयावारण-ुांस्ट्कृजतक‍ुंपदा‍कज‍ुंरजक्षत‍और‍जाकजुत‍करन‍े के‍जलए‍ुांस्ट्कृजतक‍ुुं ाधन‍प्रबंधन‍ यजजनाएं‍ (ुीअरएमपी)‍ त,यार‍ की‍ जानी‍ चाजूए।‍ ुंबंजधत‍ एजेंजुयों‍ द्वारा‍ ऐजतूाजुक‍ ईद्यानों,‍ जल‍ ुंरचनाओं‍(बााली,‍कुएं,‍तालाब)‍आत्यादद‍के‍पुनरुद्धार‍के‍जलए‍कायव‍दकया‍जाना‍चाजूए‍जल-तंत्र‍और‍ जलभर‍(एक्वीफायर)‍के‍ुाथ‍खज‍चुके‍‍ुंबंध‍दफर‍ुे‍कायम‍दकए‍जाने‍चाजूए।‍(दखे :ें‍HCP2) 3.2.5 ददल्ली‍के‍पड़े ों‍की‍रक्षा:‍ुंबजं धत‍एजेंजुयों‍द्वारा‍ईनके‍ऄपने क्षेत्रों‍के‍जलए‍एक‍ाृक्ष‍जनदेजिका‍(री‍ डायरेक्टरी)‍त,यार‍की‍जाएगी‍जजुमें ऄजद्वतीय‍ाृक्ष‍गजलयारे‍या‍पररुर, जाराुत‍ाृक्ष, ईच्च‍काबवन‍भंडारण‍ के‍पररुर‍और‍ऄजधग्रूण‍दरों‍अदद‍कज‍जचजननत‍दकया‍जाएगा।‍ऐुे‍पेड़ों/पेड़ों‍के‍ुमूूों‍कज‍स्ट्ादेिी‍ाृक्षों‍के‍ रजपण‍के‍ुंदभव‍म‍ें ुंरजक्षत‍और‍जनयंजत्रत‍दकया‍जाएगा‍और‍ुांस्ट्कृजतक‍पथ/‍प्राकृजतक‍पथ अदद‍के‍ुाथ‍ एकीकृत‍दकया‍जाएगा। 3.2.6 जनकटाती‍ जाकाु-काय‍व के‍ प्रभाा‍ कज‍ कम‍ करन‍े के‍ ईपाय:‍ पयावारण‍ ुरं क्षण‍ के‍ तूत‍ क्षेत्रों‍ ुे‍ ुटी‍ पररयजजनाओं‍पर‍जनम्नजलजखत‍मानदंड‍लाग‍ूूोंगेः i) नालों‍या‍जलाियों‍के‍ुाथ‍जस्ट्थत‍ुभी‍ग्रीनफील्ड‍और‍पुनरुद्धार‍पररयजजनाए‍ं नाल/े जलािय‍के‍ दकनारे‍ ुे‍ 10‍ मीटर‍ का‍ न्यनू तम‍ ऄजनाायव‍ बफर‍ बनाए‍ रखेंगी।‍ यदद‍ ुंभा‍ ूज‍ तज‍ स्ट्थानीय‍ जनकाय/दद.जा.प्रा.‍द्वारा‍जमीनी‍जस्ट्थजत‍देखते‍ुएए‍ऄजधक‍चौड़ा‍बफर‍ऄजनाायव‍दकया‍जा‍ुकता‍ू।, ‍ भूस्ट्ाामी‍िेी‍भूखंड‍म‍ें परू े‍एफएअर‍का‍ईपभजग‍कर‍ुकते‍ू।ैं ‍बफर‍के‍जलए‍भूजम‍प्रदान‍करने‍के‍ जलए‍मअु ाजा‍ददया‍जा‍ुकता‍ू,,‍यदद‍बफर‍छजड़न‍े के‍बाद‍िेी‍भूखडं ‍जाकाु-कायव‍के‍जलए‍बेकार‍ ूज‍जाए। ii) 'पयावारण‍ुंरक्षण‍के‍तूत‍क्षेत्रों' ऄथाा‍ईनके‍बफर‍म‍ें जनकटाती‍जाकाु-कायव‍ुे‍अने‍ााल‍े जनमावण‍ ऄपजिष्ट‍या‍ुीाेज/‍ऄपजिष्ट‍जल‍की‍डंलपग‍कज‍ुख्ती‍ुे‍प्रजतबजं धत‍दकया‍जाएगा। iii) भानों‍की‍ददिा‍आु‍तरू‍ुे‍तय‍की‍जाए‍दक‍ाे‍ग्रीन‍एंड‍ब्लू‍ुंपदा‍के‍ुामने‍ूों‍तथा‍बालकजनयों, जखड़दकयों, प,दल‍यात्री‍के‍प्रािे -स्ट्थलों,‍भ-ू तल‍पर‍्ााुाजयक‍या‍ुाावजजनक‍ऄूाते अदद‍के‍रूप‍ में‍कायविील‍ऄग्रभाग‍बनाए‍रखा‍जाए।‍दकुी‍भी‍ुाावजजनक‍स्ट्थान‍ुंबंधी‍ऄजनाायव‍ऄपेक्षाएं‍जजन्ू‍ें पररयजजनाओं‍के‍ऄतं गतव ‍परू ा‍दकया‍जाना‍ूजता‍ू,,‍का‍जलाियों‍के‍ुाथ-ुाथ‍ुाावजजनक‍ु,रगाू‍या‍ पाकों‍के‍रूप‍में‍भी‍प्रदान‍की‍जा‍ुकता‍ू।, iv) पयावारण‍ुंरक्षण‍के‍तूत‍क्षेत्रों‍के‍जनकट‍नइ‍पररयजजनाओं‍(जनधावररत‍ददिा‍जनदिे ों‍के‍ऄनुु ार)‍के‍ जलए‍पयावारणीय‍प्रभाा‍का‍अकलन‍(इअइए)‍ करना‍ऄजनाायव‍ूजगा। 3.3 ‍‍‍नइ‍ग्रीन-ब्ल‍ूुपं दा‍का‍जनमाणव 3.3.1 िूर‍की‍पररजध‍पर‍‘ूररत‍जाकाु’:‍ूररत‍पट्टी‍के‍गांाों‍के‍जलए‍ूररत‍जाकाु‍क्षेत्र‍नीजत‍(ग्रीन‍डेालपमेंट‍ एररया‍पॉजलुी)‍प्रस्ट्ताजात‍की‍गइ‍ू‍, और‍आुम‍ें ुीजमत‍जाकाु‍की‍ऄनुमजत‍दी‍गइ‍ू‍, तथा‍भूजम‍के‍पयाप्तव ‍ जूस्ट्ुे‍कज‍ान‍क्षेत्र‍और‍ूररत‍अारण‍बनाए‍रखने‍के‍जलए‍जनधावररत‍दकया‍गया‍ू।, ‍ू।, ‍(दखे :ें‍DEV2) 3.3.2 िूरी‍स्ट्तर‍के‍ूररत‍गजलयारों‍के‍रूप‍म‍ेंनालों‍के‍ुाथ-ुाथ‍ूरे‍बफर‍(दखे :ें‍DCN):[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 23 i) नालों‍के‍ुाथ-ुाथ‍ऐुी‍भूजम‍की‍पूचान‍की‍जाएगी‍जजुे‍प्राकृजतक‍ूरे‍बफर‍के‍रूप‍म‍ें बनाए‍रखा‍ जा‍ुकता‍ू।, ‍आु‍भूजम‍म‍ें ुभी‍जनयजजजत‍और‍ऄजनयजजजत‍क्षत्रे ों‍में‍स्ट्क्रब‍भूजम, मौजूदा‍बफर‍या‍बाढ़‍ के‍म,दान‍ऄथाा‍खाली‍ुरकारी‍भूजम‍िाजमल‍ूज‍ुकती‍ू।ैं ‍आुके‍ऄजतररि ,‍ुभी‍नइ‍पररयजजनाए‍ाँ ऐुे‍बफर‍की‍्ास्ट्था‍करेंगी। ii) ुंबंजधत‍एजेंजुयां‍नालों‍के‍दकनारे‍जाकजुत‍दकए‍गए‍पद, ल‍और‍ुाआकललग‍पथ‍के‍ज़ररए‍जुड़ी‍ग्रीन- ब्ल‍ू ुंपदाओं‍का‍िूर-्ापी‍नेटाकव‍बनाने‍के‍जलए‍ग्रीन‍मजजबजलटी‍कॉररडजर‍का‍जनमावण‍करेंगी‍ (दखे :ें‍MOB3)।‍नालों‍के‍पानी‍कज‍ुाफ‍दकया‍जाएगा‍और‍ुीाेज‍या‍ऄपजिष्ट‍जल‍के‍बजूाावू‍की‍ ऄनुमजत‍नूीं‍दी‍जाएगी।‍पानी‍की‍गुणािा‍में‍ुुधार‍के‍जलए‍ईुी‍स्ट्थान‍पर‍जल-ईपचार‍दकया‍ जाएगा।. iii) प्राकृजतक‍ूरे‍बफर‍कज‍ज,ा‍जल‍जनकाुी,‍भूजल‍पनु भवरण‍स्ट्थल‍के‍ज़ररए‍या‍बाढ़‍के‍पानी‍कज‍ुजखने‍ के‍स्ट्पंज‍अदद‍के‍रूप‍में‍‍जल-अधाररत‍पाररजस्ट्थजतकी‍के‍जलए‍अद्रभव ूजम‍और‍दलदल‍के‍रूप‍म‍ें जाकजुत‍दकया‍जा‍ुकता‍ू।, ‍ईन‍स्ट्थानों‍पर‍जूां‍बफर‍काफी‍जास्ट्तृत‍ूैं, ाूा‍ाँ ईन्ू‍ें पाकव, यजग‍करन‍े के‍जलए‍स्ट्थान, दौड़-भाग‍ााल‍े खेल‍(जबना‍औपचाररक‍बठ, ने‍की‍्ास्ट्था‍के), खुल‍े स्ट्थान‍पर‍ प्रदिवजनयां, नाटक‍आत्यादद‍और‍ानस्ट्पजत-ाारटका, ुामुदाजयक‍ईद्यान, नौका‍जाूार, रेस्ट्तरा ं अदद‍के‍ रूप‍म‍ें ुदक्रय‍ुाावजजनक‍ईपयजग‍के‍जलए‍जडज़ाआन‍दकया‍जा‍ुकता‍ू।, ‍जाराुत‍पथ‍(ूरे रटेज‍रेल)‍ कज‍ग्रीन‍मजजबजलटी‍कॉररडजर‍के‍ुाथ‍एकीकृत‍दकया‍जा‍ुकता‍ू।, ‍ 3.3.3 कम‍प्रयि ु ‍स्ट्थलों‍और‍बजं र‍भजू म‍कज‍ग्रीन-ब्ल‍ूुपं दा‍के‍रूप‍म‍ेंदफर‍ु‍ेनया‍रूप‍दने ा: i) ऐुे‍स्ट्थल‍ज,ुे‍बंद‍लैंडदफल, बंद‍ताप‍जाद्युत‍ुंयंत्र‍म‍ें ऐि-डाआक,‍छजड़‍दी‍गइ‍खदान‍और‍खान अदद‍ स्ट्थलों‍म‍ें जाीाि ता,‍जमट्टी‍की‍ऄजस्ट्थर‍प्रकृजत‍की‍ुमस्ट्याएं‍ूजती‍ू।ैं ‍आन्ू‍ें ्ाूायवता‍के‍ऄनुु ार‍जा, ‍ जाजाधता‍पाकों, आकज-पाकों, जलाियों, अदद‍म‍ेंपररार्नतत‍दकया‍जा‍ुकता‍ू।, ‍ ii) ुंबंजधत‍एजेंजुयों‍द्वारा‍लैंडदफल‍पर‍लगे ुी‍कचरे‍के‍प्रुंस्ट्करण/पनु :नाीकरण, औद्यजजगक‍ुंरचनाओं‍ की‍जनर्नमजतयों‍के‍नए‍ईपयजग‍और‍ऄनुकूली‍पुन:‍ईपयजग‍ज,ुी‍ऄप्य‍न‍करने‍ााली‍कायनव ीजतयों‍ कज‍ऄपनाया‍जा‍ुकता‍ू।, 3.3.4 ऄन्य‍पूलः i) जनयजजजत‍ूररयाली‍का‍प्रााधान: लडैं ‍पूललग‍क्षेत्रों‍म,ें मौजूदा‍ईद्यानों, अद्रभव ूजम, जनचले‍आलाकों‍कज‍ ुाावजजनक‍पाकों‍और‍जलभर‍पुनभवरण‍तालाबों‍के‍जाकाु‍के‍जलए‍िाजमल‍दकया‍जाएगा‍तादक‍जल‍ जनकाुी‍प,टनव‍कज‍बनाए‍रखा‍जा‍ुके।‍प्लान‍द्वारा‍जनधावररत‍ पुनःुुधार‍और‍टीओडी‍यजजनाओं‍के‍ ज़ररए‍भी‍ऄजनाायवत:‍ुाावजजनक‍ूररयाली‍की‍जानी‍ूजगी।‍भानों‍के‍भीतर‍जाजभन्न‍प्रकार‍के‍उ्ा‍व जमजश्रत‍ईपयजगों‍कज‍प्रजत्ुाजूत‍दकया‍जाएगा‍तादक‍पाकों‍और‍खलु े‍क्षेत्रों‍के‍जलए‍ऄजधक‍भूजम‍मुि ‍ की‍जा‍ुके।‍(दखे :ें‍DCN) ii) ुदक्रय‍मनजरंजन‍और‍खले ‍ुजु ाधाओं‍का‍प्रााधान:‍खले ‍ुुजाधाओं‍की‍्ास्ट्था‍ऐुे‍ुुलभ‍स्ट्थानों‍पर‍ की‍जानी‍अाश्यक‍ू‍, जज‍ुाावजजनक‍परराून‍और‍प,दल‍चलन‍े और‍ुाआदकल‍चलान‍े के‍नटे ाकव‍ु‍े ऄच्छी‍तरू‍ुे‍जड़ु े‍ुएए‍ूों।‍नइ‍खेल‍ुुजाधाएं‍ज,ुे‍स्ट्टेजडयम, जजला‍खेल‍पररुर, खेल‍के‍म,दान, बुएईद्देश्यीय‍म,दान‍अदद‍का‍जनमावण‍जनााजुयों‍के‍बीच‍स्ट्ास्ट्थ‍जीान‍और‍ुदक्रय‍जीान‍िल, ी‍कज‍ प्रजत्ुाजूत‍करने‍के‍ुाथ-ुाथ‍प,रालजम्पक्ु‍ुजूत‍राष्ट्रीय‍और‍ऄतं राष्ट्रव ीय‍प्रजतस्ट्पधाव‍खले ों‍में‍ुदक्रय‍ प्रजतभाजगता‍करन‍ेके‍जलए‍जखलाजड़यों‍की‍क्षमताओं‍कज‍बढ़ाने‍के‍जलए‍बुजनयादी‍ढााँचा‍प्रदान‍करेगा।24 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] iii) जािीे ‍ूररयाली‍पररयजजनाएं:‍ुभी‍ुंबंजधत‍एजेंजुयों‍द्वारा‍जनााजुयों‍के‍जलए‍ज,ा-जाजाधता‍पाकव, मनजरंजन‍पाकव, बच्चों‍के‍ुाूजुक‍खेलकूद‍के‍म,दान, नुवरी‍अदद‍ज,ुे‍मनजरंजन‍के‍कइ‍जाकल्प‍दने ‍े की‍जािेी‍पररयजजनाएं‍िुरू‍की‍जाएंगी। iv) ररचार्मजग‍एक्वीफायु:व‍दद.जा.प्रा.‍और‍ददल्ली‍जल‍बजडव‍ईपचाररत‍जल‍के‍ईपयजग‍ुे‍कृजत्रम‍जलािय‍ बनाकर‍मूत्ापूणव‍क्षेत्रों‍में‍भूजल‍पनु भवरण‍करने‍के‍जलए‍पररयजजनाएाँ‍िुरू‍करेंगे। v) ुभी‍क्षमताओं‍ााल‍े पाकव:‍िूर‍भर‍में‍ुभी-क्षमता‍ााले‍पाकव‍बनाए‍जाएंग,े जज‍ऄलग‍ुे‍भूजम‍ जनधावररत‍करके‍ऄथाा‍मौजूदा‍पाकों‍कज‍रेरजदफट‍करके‍दकया‍जाएगा।‍आन‍पाकों‍कज‍जािेी‍रूप‍ुे‍ दद्ांगजन, बुजुगों, और‍देखभाल‍करन‍े ााल‍े के‍ुाथ‍अए‍बच्चों‍एां‍जििओंु ‍की‍जरूरतों‍कज‍पूरा‍ करने‍के‍जलए‍खेलन‍ेऔर‍मनजरंजक‍गजतजाजधयों‍के‍जलए‍जडज़ाआन‍दकया‍जाएगा।‍ 3.4 ‍‍जनर्नमत‍ुरं चना‍म‍ेंग्रीन-ब्ल‍ूुजु ाधाएं‍बढ़ाना 3.4.1 स्ट्थानीय‍स्ट्तर‍के‍मौजूदा‍पाकों‍और‍ऄन्य‍जनयजजजत‍ूररत‍क्षेत्रों‍कज‍स्ट्थानीय‍ जनकायों/डीडीए‍ या‍ अरडब्ल्यूए/एमटीए‍(माकेट‍रेडुव‍एुजजुएिन),‍ुमुदाय‍अदद‍द्वारा‍जनम्नजलजखत‍ूस्ट्तक्षेप‍कारवााइ‍करके‍ुुधारा‍ जाएगाः क) जल‍ुां दे ी‍िूरी‍जडजाआन i) ाीव-जल‍की‍जनकाुी‍कज‍पाकों‍के‍भू-दश्ृ य‍जनमावण‍और‍जडजाआन‍में‍एकीकृत‍दकया‍जाएगा‍तादक‍ ाे‍ाीाव‍जल‍ुंचयन‍तंत्र‍के‍रूप‍में‍कायव‍कर‍ुकें। ii) जल‍न‍ुजखन‍े ााली‍पक्की‍ुतू‍के‍स्ट्थान‍पर‍ऄधव-प्राेश्य‍ुामग्री‍का‍प्रयजग‍दकया‍जाएगा‍तादक‍ भूजल‍पनु भवरण‍और‍स्ट्थानीय‍तापन‍में‍कमी‍ूज‍ुके। iii) बड़े‍पाकों‍(ुामुदाजयक‍स्ट्तर‍और‍आुुे‍उपर)‍में, ईु‍क्षेत्र/आलाके‍के‍जलए‍ऄपजिष्ट‍जल‍ईपचार‍ की‍जाकेंद्रीकृत‍ुुजाधाओं‍कज‍भू-दश्ृ य‍जडजाआन‍में‍एकीकृत‍दकया‍जा‍ुकता‍ू‍, और‍ईपचाररत‍ पानी‍का‍ईपयजग‍बागाानी‍के‍जलए‍या‍भूजल‍पुनभरव ण‍झीलों‍के‍जलए‍दकया‍जा‍ुकता‍ू।, ‍खाद‍ बनाने‍के‍जलए‍ुमर्नपत‍स्ट्थान‍भी‍प्रदान‍दकया‍जा‍ुकता‍ू।, ख) पाकों‍की‍कायक्षव मता‍म‍ेंुधु ार i) दद.जा.प्रा./स्ट्थानीय‍जनकायों‍द्वारा‍बड़े‍पाकों‍(ुामुदाजयक‍स्ट्तर‍और‍आुुे‍उपर)‍के‍जलए‍या‍पाकों‍ के‍ुमूू‍के‍जलए‍ुमर्नपत‍ाृक्षारजपण‍कायवनीजत‍बनाइ‍जाएगी‍तादक‍ाायु‍और‍्ाजन‍प्रदीू ण‍कज‍ कम‍दकया‍जा‍ुके,‍तापन‍कज‍कम‍दकया‍जा‍ुके, अरामदायक‍लघ‍ु जलााय-ु क्षेत्र‍‍बनाया‍जा‍ुके‍ और मनजरंजन‍के‍जलए‍छाया-युि ‍क्षत्रे ‍बनाए‍जा‍ुकें। ii) बड़े‍पाकों‍म‍ें भजजनालयों, पुस्ट्तकालयों/पढ़न‍े के‍क्षेत्रों, बाूरी‍प्रदिवन, प्रदिवजनयों, यजग‍और‍ ुाधना, बच्चों‍के‍जलए‍ुाूजुक‍पथ‍अदद‍ज,ुी‍गजतजाजधयां‍करन‍े के‍जलए‍जाजनयजमत‍तरीके‍ु‍े ऄनुमजत‍दी‍जा‍ुकती‍ ू।, ‍(दखे :ें‍DCN) 3.4.2 ुााजव जनक‍क्षत्रे ों‍की‍ूररयाली: i) दद.जा.प्रा. और‍स्ट्थानीय‍जनकायों‍ुजूत‍ुभी‍ुंबंजधत‍एजेंजुयां, 18‍मी.‍और‍ईुुे‍ऄजधक‍के‍ मागावजधकार‍(अरओडब्ल्य)ू ‍ुड़कों‍पर‍ूररयाली‍ुुजनजित‍करेंगी।‍आु‍तरू‍की‍ुड़कों‍कज‍छाया‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 25 देने‍ााले‍ईपयि ु ‍ुदाबूार‍पड़े ‍लगाकर‍और‍ब,ठन‍े के‍जलए‍त,यार‍दकए‍गए‍क्षेत्रों, ूरे-भरे‍प्लाज़ा, नालों‍के‍दकनारे‍ज,ा-झरु मुटों‍(बायज-स्ट्ााल)‍अदद‍का‍जनमावण‍करके‍एक‍अरामदायक‍लघ‍ु जलाायु‍क्षेत्र‍(माआक्रॉक्लाआमेट)‍बनान‍े के‍जलए‍दकया‍जा‍ुकता‍ू।, ‍पलु ों‍और‍फुट‍ओार‍जब्रज‍पर‍ भी खंभे, छत, प,रापेट‍अदद‍पर‍ूररयाली‍के‍तत्ाों‍कज‍भी‍िाजमल‍दकया‍जा‍ुकता‍ू।, ‍आु‍तरू‍ की‍ूररयाली‍कज‍प्राथजमकता‍के‍अधार‍पर‍ईन‍क्षेत्रों‍में‍िरूु ‍दकया‍जाएगा‍जूां‍ाॉक‍प्लान‍लाग‍ू दकए‍जा‍रू‍ेू‍ैं(दखे :ें‍MOB3)। ii) ुभी‍ुतू‍ााले‍पार्ककग‍स्ट्थलों‍में‍80%‍क्षेत्र‍म‍ेंुतू‍जल‍ुजखने‍ााली‍ या‍ जल‍ ुजखन‍े ााली‍खड़ंज‍ूजगी।‍जूां‍भी‍ुभं ा‍ूज,‍ऐुी‍जगूों‍पर‍ जनयजमत‍ ऄंतराल‍ पर‍ पेड़‍ लगाए‍ जाएंगे। iii) ुंबंजधत‍एजेंजुयां‍फ्लाइओारों‍के‍नीचे,‍पानी‍की‍पाआपलाआनों‍के‍ुाथ‍भूजम‍पर,‍कच्ची‍ुड़कों‍पर‍ बचे‍स्ट्थानों‍पर‍भूदश्ृ य-जनमावण‍और‍ाृक्षारजपण‍करेंगी।‍यदद‍्ाूायव‍ूज‍तज‍आनम‍ें ुे‍कुछ‍का‍ ईपयजग‍जनता‍द्वारा‍दकया‍जा‍ुकता‍ू।, 3.4.3 ‍ूरा-भरा‍करन‍े कज‍प्रजत्ुाजूत‍करना:‍भूखंड‍के‍भूजम‍ईपयजग‍पर‍्यान‍न‍देत‍े ुएए‍खाली‍जनजी/ुाावजजनक‍ भूजम‍पर‍िूरी‍खेती, ुामुदाजयक‍ईद्यान‍अदद‍ज,ुी‍गजतजाजधयों‍कज‍प्रजत्ुाजूत‍दकया‍जा‍ुकता‍ू।, ‍ुमस्ट्त‍ ईपयजग‍पररुरों‍के‍भीतर‍जड, -खेती/उ्ाावधर‍खेती‍भी‍एक‍ऄनुमत‍गजतजाजध‍ूजगी।‍स्ट्थानीय‍जनकाय‍और‍ डीडीए‍ऐुी‍गजतजाजधयां‍करने‍के‍जलए‍ुमुदायों‍/‍अरडब्ल्यूए‍/‍स्ट्कूलों‍/‍ऄन्य‍जूतधारकों‍कज‍ईपयुि ‍ ददिाजनदेि‍और‍क्षमता‍जनमाणव ‍द‍े ुकत‍े ू।ैं ‍ुरकारी‍स्ट्ााजमत्ा‍ााली‍ुमस्ट्त‍खाली‍भूजम‍पर‍ऄजनाायवत:‍ जंगली‍घाु‍ईगाने‍का‍प्रााधान‍भी‍लागू‍दकया‍जाएगा। 3.4.4 भानों‍और‍स्ट्थलों‍के‍जलए‍ग्रीन-ब्ल‍ू कारक(जीबीएफ):‍यूबीबीएल‍के‍ऄनुुार‍जाकाु-कायों‍के‍जलए‍ग्रीन‍ रेरटग‍ऄजनाायव‍ूजगी‍तादक‍मक, ेजनकल‍ूीरटग/कूललग‍ुे‍ूजन‍े ााली‍उजाव‍की‍खपत‍कज‍कम‍दकया‍जा‍ुके‍ और‍प्रदीू ण‍कज‍घटाया‍जा‍ुके।‍आुके‍ऄजतररि , भूखंडों/भानों‍के‍भीतर‍छत‍पर‍बगीचों, ट,रेु‍गाडनव ,‍ ूररत‍दीाारों,‍भू-दश्ृ य‍और/या‍पानी‍ुजखने‍ााली‍जमीन, अदद‍के‍रूप‍में‍ग्रीन-ब्लू‍जािीे ताओं‍कज‍ुभी‍ जाकाु‍पररयजजनाओं‍में‍प्रजत्ुाजूत‍दकया‍जाएगा। i) ग्रीन-ब्लू‍कारक‍(ग्रीन-ब्लू‍फ,क्टर)‍(जीबीएफ) ुभी‍नइ‍पररयजजनाओं‍और‍जाकाु-कायों‍पर‍लाग‍ू ूजगा।‍आुकी‍गणना‍स्ट्थल‍और‍जबलल्डग‍जडजाआन‍म‍ें जनधावररत‍जाजिष्ट‍ग्रीन-ब्ल‍ू जािेीताओं‍के‍ जनधावररत‍भारांि‍(ाेटेज)‍कज‍जमलाकर‍की‍जाती‍ू।, ii) स्ट्थानीय‍जनकायों‍द्वारा‍न्यनू तम‍जीबीएफ‍प्राप्त‍करन‍े और‍मौजूदा‍आमारतों‍पर‍आु‍े लाग‍ू करन‍े के‍ जलए‍प्रजत्ुाून‍और‍ूतजत्ुाून‍‍ददए‍जा‍ुकते‍ू।ैं iii) ुभी‍नइ‍पररयजजनाओं‍और‍जाकाु-कायों‍कज‍प्लान‍द्वारा‍जनधावररत‍जीबीएफ‍का‍न्यूनतम‍मान‍ प्राप्त‍करना‍ूजगा।‍ iv) जीबीएफ की‍गणना‍प्लॉट‍स्ट्तर‍पर‍की‍जाएगी‍और‍आुे‍ुभी‍भान‍और‍नक्िा‍ुंबंधी‍स्ट्ाीकृजतयों‍ के‍जलए‍एक‍ित‍व के‍रूप‍म‍ेंिाजमल‍दकया‍जाएगा। 3.5 ‍ग्रीन-ब्ल‍ूआन्फ्रास्ट्रक्चर‍का‍प्रबधं न 3.5.1 ुभी‍ुंबंजधत‍एजेंजुयों‍द्वारा‍ददल्ली‍स्ट्थाजनक‍ुूचना‍प्रणाली‍के‍ऄतं गतव ‍ग्रीन-ब्लू‍ऄाुंरचना‍(ग्रीन-ब्ल‍ू आन्फ्रास्ट्रक्चर)‍का‍एक‍डेटाबेु‍बनाकर‍रखा‍जाएगा‍तथा‍मौजूदा‍और‍ुंभाजात‍स्ट्थलों‍की‍म,लपग‍की‍ जाएगी। i) डेटाबेु‍ऄनलु ग्नक‍2‍पर‍दी‍गइ‍ग्रीन‍एडं ‍ब्लू‍ुंपदा‍के‍टाआपजलॉजजकल‍ागीकरण‍पर‍अधाररत‍ ूजगा‍और‍आु‍ेडीडीए‍की‍ाेबुाआट‍के‍मा्यम‍ु‍ेजनता‍के‍जलए‍ईपलब्ध‍कराया‍जाएगा।26 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ii) ऄनुुंधान‍और‍भााी‍यजजना‍ूते ु‍एक‍ुमृद्ध‍ुंुाधन‍त,यार‍करने‍के‍जलए‍ुमय‍के‍ुाथ-ुाथ‍ जल‍जाज्ञान, स्ट्थलाकृजत, ुंबंजधत‍ज,ा‍जाजाधता‍अदद‍ज,ुी‍जानकारी‍भी‍जजड़ी‍जा‍ुकती‍ू।ैं ‍ ाृक्ष‍जनदेजिका‍कज‍भी‍डेटाबेु‍में‍िाजमल‍दकया‍जा‍ुकता‍ू।, iii) एक‍डेटा-िेयररग‍प्रजटजकॉल‍यू‍ुुजनजित‍करने‍के‍जलए‍स्ट्थाजपत‍दकया‍जाएगा‍दक‍ुभी‍ुंबंजधत‍ एजेंजुयां‍डेटाबेु‍कज‍प्राुंजगक‍और‍ऄद्यतन‍रखने‍के‍जलए‍ाास्ट्तजाक‍ुमय‍या‍तत्काल‍अधार‍ पर‍ऄथाा‍अाजधक‍रूप‍ुे‍डेटा‍प्रदान‍करती‍रू‍ें (ज,ुे‍जीबीएफ‍के‍ुाथ‍जनमावण‍और‍स्ट्कीम‍ ुंबंधी‍स्ट्ाीकृजतयां‍तथा‍ुाावजजनक‍ूररत‍क्षेत्र, ानीकरण, नए‍पाकव‍का‍जनमावण‍अदद)।‍यू‍डेटा‍ बेुलाआन‍कज‍ुेट‍करने, नइ‍पूल‍की‍यजजना‍बनाने‍और‍ईुे‍र,क‍करने‍तथा‍ग्रीन-ब्लू‍ुंपदाओं‍ की‍मात्रा‍और‍गणु ािा‍में‍बदलाा‍का‍अकलन‍करने‍म‍ेंमदद‍करेगा। 3.5.2 ग्रीन-ब्ल‍ू ुंपदाओं‍की‍ुुरक्षा‍और‍ुंाधवन‍आु‍प्लान‍की‍प्राथजमकता‍ू।, ‍यू‍ऄनुिंुा‍की‍जाती‍ू‍, दक‍ुंबंजधत‍ एजेंजुयां‍ऄपन‍े स्ट्ाय‍ं के‍ुंुाधनों‍कज‍एक‍तरफ‍रखें‍और‍ूररयाली‍बढ़ान‍े की‍पूल‍करन‍े के‍जलए‍जािपजीण‍ के‍ऄन्य‍नाीन‍तंत्रों‍का‍पता‍लगाएं।‍आु‍प्रयजजन‍के‍जलए‍एक‍ुमर्नपत‍ूररत‍कजि‍(ग्रीन‍फंड)‍भी‍बनाया‍जा‍ ुकता‍ू।, 3.5.3 ुंबंजधत‍एजेंजुयां‍नागररकों‍और‍जूतधारक‍ुमूूों‍की‍ग्रीन-ब्लू‍ुंपदाओं‍के‍ुंरक्षण‍और‍ुुधार‍में‍भूजमका‍ जनभाने‍और‍ुामुदाजयक‍स्ट्ााजमत्ा‍प,दा‍करन‍े तथा‍आन‍ुाझा‍ुंुाधनों‍और‍िूरी‍ुाावजजनक‍ुंपजि‍के‍प्रजत‍ जजम्मेदारी‍की‍भााना‍ईत्पन्न‍करने‍म‍ेंमदद‍करेंगी। --- x --- x ---- x --- x --- खडं ‍2 ऄथ्व ास्ट्था पष्ठृ भजू म‍और‍प्रमखु ‍नीजतगत‍ुरजकार‍ ददल्ली‍जाि‍के‍ुबुे‍तेजी‍ुे‍बढ़ते‍िूरी‍केंद्रों‍में‍ुे‍एक‍ू।, ‍यू‍िूर‍राष्ट्रीय‍ुकल‍घरेलू‍ईत्पाद‍(जीडीपी)‍में‍छठा‍ुबु‍े बड़ा‍यजगदानकता‍व (7.1%)‍ू‍, यू‍जीडीपी‍की‍ाृजद्ध‍दर‍राष्ट्रीय‍औुत‍ुे‍4%‍ऄजधक‍ब,ठती‍ू।, ‍ददल्ली‍राष्ट्रीय‍राजधानी‍ क्षेत्र‍के‍अर्नथक‍मलू ाधार‍के‍रूप‍में‍कायव‍करती‍ू,, जज‍आु‍क्षेत्र‍की‍जीडीपी‍के‍50% ुे‍ऄजधक‍का‍यजगदान‍दते ा‍ू।, ‍यू‍ िूर‍आु‍क्षेत्र‍का‍ुबुे‍बड़ा‍ााजणजज्यक‍केंद्र‍ू‍,जजुके‍राष्ट्रीय‍और‍ा,जिक‍जािीय‍नेटाकव‍के‍ुाथ‍मजबूत‍ुंबंध‍ू।ैं ददल्ली‍प्रमुख‍स्ट्टाट-व ऄप‍आकजजुस्ट्टम‍के‍रूप‍म‍ें ईभरी‍ू,, जूां‍ईच्च‍ुाक्षरता‍स्ट्तर‍(86.2%), युाा‍अबादी‍(2041‍म‍ें औुत‍ अयु‍लगभग‍35‍ाीव‍ूजने‍की‍ुंभााना‍‍ू), ‍और‍कायविील‍अयु‍ााली‍अबादी‍का‍एक‍बड़ा‍ऄनुपात‍रूता‍ू‍, (कुल‍ कायविील‍जनुंख्या‍2017-18 में‍6.28 जमजलयन‍थी‍और‍2040-41 में‍आुके‍बढ़कर‍10.7 जमजलयन‍ूजन‍े की‍ईम्मीद‍ू), ।‍ आुके‍ऄजतररि , प्रौद्यजजगकीय‍‍ुाक्षरता‍और‍पुएचं , रचनात्मकता, प्रजतभा‍कज‍अकर्नीत‍करन‍े की‍क्षमता‍तथा‍औुत‍जिक्षा‍ के‍स्ट्तर‍ुंबंधी‍ुभी‍ुूचकांकों‍के‍ुंदभव‍में, ददल्ली‍ुभी‍राज्यों‍और‍ुंघ‍राज्यक्षेत्रों‍में‍ुाोच्च‍स्ट्थान‍पर‍ू‍, (एमपीअइ‍ ररपजटव)।‍यू‍जस्ट्थजत‍नााचार‍कज‍बढ़ााा‍देने‍और‍रजजगार‍के‍ऄाुर‍प,दा‍करने‍की‍अाश्यकता‍कज‍आंजगत‍करती‍ू‍, तादक‍ आु‍माना‍अबादी‍द्वारा‍ुृजजत‍अर्नथक‍ुंभाानाओं‍का‍लाभ‍ईठाया‍जा‍ुके।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 27 ददल्ली‍म‍ें खुदरा,‍थजक‍और‍भडं ारण‍केंद्र‍िूर‍भर‍म‍ें फ,ल‍े ुएए‍ू।ैं ‍देि‍की‍राजधानी‍ूजन‍े के‍नात‍े यू‍ुरकारी‍और‍ऄधव- ुरकारी‍ुंस्ट्थाओं‍का‍केंद्र‍ू,, जूााँ‍जाजभन्न‍राष्ट्रीय/बुएराष्ट्रीय‍कंपजनयों‍के‍मुख्यालय‍जस्ट्थत‍ू।ैं ‍यू‍प्रमुख‍एमअइुीइ (ब,ठक, प्रजत्ुाून, ुम्मेलन, प्रदिवजनयााँ), यात्रा‍और‍अजत्य‍्ाुाय‍का‍गंत्-स्ट्थल‍ू।, ‍आु‍िूर‍एक‍जािाल‍ुांस्ट्कृजतक‍पूंजी‍ भी‍ू‍, जजुुे‍ुांस्ट्कृजतक‍(पयवटन, यात्रा, एफएंडबी, अदद)‍और‍रचनात्मक‍(मीजडया, जडजाआन, कला‍अदद)‍ईद्यजगों‍कज‍ बढ़ााा‍देने‍के‍जलए‍लाभ‍ईठाया‍जा‍ुकता‍ू।, ‍ददल्ली‍न‍े एजियाइ‍खेलों‍(1982)‍और‍राष्ट्रमंडल‍खेलों‍(2010)‍ज,ु‍े बड़‍े अयजजनों‍की‍भी‍मेजबानी‍की‍ू।, ददल्ली‍िूर‍प्रमुख‍औद्यजजगक‍केंद्र‍के‍रूप‍म‍ें भी‍कायव‍करता‍ू‍, जूां‍33‍यजजनाबद्ध‍औद्यजजगक‍एस्ट्टेट,‍चार‍फ्ल,रटड‍फ,क्री‍ क्लस्ट्टर, 1.75‍लाख‍ुूक्ष्म,‍लघु, म्यम‍ईद्यम‍(90%‍ुे‍ऄजधक‍ुूक्ष्म‍ईद्यम)‍और‍23‍ऄजधुूजचत‍ग,र-ऄनुरूप‍औद्यजजगक‍ ुमूू‍ू।ैं ‍य‍े ईद्यजग‍तथा‍घरेल‍ू ईद्यजग‍कुिल‍और‍ऄकुिल‍दजनों‍प्रकार‍के‍कामगारों‍के‍जलए‍रजजगार‍प,दा‍करत‍े अ‍रू‍े ू।ैं ‍ ईद्यजग‍क्षेत्र‍में‍प,माने‍के‍स्ट्तर‍पर‍जाखंडन‍ुएअ‍ू‍, और‍कायबव ल‍का‍एक‍बड़ा‍जूस्ट्ुा‍लघ‍ु और‍ुूक्ष्म‍ईद्यजगों‍एा‍ं घरेल‍ू ईद्यजगों‍म‍ें कायवरत‍ू।, ‍जपछले‍दज‍दिकों‍में, ददल्ली‍म‍ें तृतीयक‍क्षेत्र‍की‍ओर‍झुकाा‍देखा‍गया‍ू।, ‍ददल्ली‍की‍लगभग‍83%‍ अय‍तृतीयक‍क्षेत्र‍ुे‍अती‍ू‍, और‍लगभग‍15%‍जद्वतीयक‍क्षत्रे ‍(एनएुएु 2015-16,‍पीएलएफएु‍(अाजधक‍श्रम‍बल‍ ुाेक्षण)‍2017-18)‍ुे‍ुृजजत‍ूजती‍ू।, ‍ प्रदीू ण‍कज‍लेकर‍बढ़ती‍लचता‍कज‍देखत‍े ुएए, पयावारण-ऄनुकूल‍स्ट्ाच्छ‍ऄथव्ास्ट्थाओं‍ज,ुेदक‍अइटी/अइटीइएु, ज्ञान- अधाररत‍और‍ूाइ-टेक‍ईद्यजगों, ईद्यमी‍कायवकलाप, ररयल्टी‍बाजारों, पयवटन, अजत्य, ुंभार-तंत्र, परराून,‍ुंचार, ऄत्याधुजनक‍स्ट्ाास्ट््य‍ुेाा‍और‍ईच्च‍जिक्षा‍की‍ओर‍रुख‍करने‍पर‍जाचार‍दकया‍गया‍ू।, ‍जािेीकर,‍अइटी‍ईद्यजग‍का‍ जाकाु‍ूजने‍और‍आुे‍नीजतगत‍ुूायता‍जमलने‍की‍ईम्मीद‍ू।, अर्नथक‍जाकाु‍ुंबंधी‍नीजतयों‍कज‍रजजगार‍प्रदान‍करन‍े ााल‍े लघु‍और‍ुूक्ष्म‍ईद्यमों‍तथा‍ऄुंगरठत‍ऄथव्ास्ट्थाओं‍कज‍ ुूायता‍देने‍की‍ददिा‍में‍मजड़ा‍जा‍ुकता‍ू, जबदक‍ऄपेक्षाकृत‍स्ट्ाच्छ,‍प्रदीू ण‍न‍करने‍ााली‍ऄथव्ास्ट्थाओं‍कज‍ऄपनाना‍ ुुजनजित‍दकया‍जा‍ुकता‍ू।, लैंड‍पूललग‍और‍ऄन्य‍जाकाु‍नीजतयों‍कज‍कायावन्ायन‍ुे‍2041‍तक‍जनमावण‍क्षेत्र‍म‍ें कायवबल‍ तीन‍गुना‍ूजन‍े की‍अिा‍की‍जा‍ुकती‍ू।, ‍टीऔडी‍नीजत‍और‍मजबूत‍क्षेत्रीय‍परस्ट्पर‍जनभवरता‍ुे‍परराून‍्ापार‍और‍ खुदरा‍क्षेत्र‍म‍ेंरजजगार‍के‍ऄाुर‍भी‍बढ़ेंगे। कइ‍पूावाती‍औद्यजजगक‍स्ट्थल‍स्ट्ाच्छ,‍ुेाा,‍ज्ञान, जाि‍और‍मनजरंजन-ईन्मुख‍कायों‍के‍ुमूूों‍म‍ें रूपांतररत‍ूजन‍े के‍दौर‍ु‍े गुजर‍रू‍े ू।ैं ‍आुके‍कारण‍ााजणजज्यक‍और‍औद्यजजगक‍ईपयजग‍के‍बीच‍की‍ुीमाएं‍धूजमल‍ूज‍गइ‍ूैं, और‍ऐु‍े एकांगी- कायावत्मक‍क्षेत्रों‍के‍जाजाधीकरण‍और‍अधुजनकीकरण‍दकए‍जाने‍की‍अाश्यकता‍ू।, ‍तकनीकी‍नााचार ज,ुे‍ऐप-अधाररत‍ ुेााएं, गजदाम‍ुे‍घर‍तक‍ुामग्री‍पुएचाँ ान‍े ााला‍मॉडल; दरू दराज‍क्षेत्रों‍म‍ें रूकर‍काम/‍घर‍ुे‍काम‍करना‍अदद‍काय‍व स्ट्थलों‍और‍ुंबंजधत‍अाश्यकताओं‍का‍स्ट्ारूप‍और‍रूप‍बदल‍रू‍े ू।ैं ‍ऄगल‍े 3‍ाीों‍में‍कज-ार्ककग‍स्ट्थलों‍की‍मागं ‍तीन‍गुना‍ ूजने‍की‍ुंभााना‍ू‍, और‍बड़े‍ईद्यमों‍के‍जलए‍मांग‍म्यााजध‍ुे‍दीघव-ऄाजध‍म‍ें बढ़ने‍की‍ईम्मीद‍ू।, ‍ददल्ली‍की‍जीडीपी‍म‍ें डेटा-ुमर्नथत‍प्रौद्यजजगदकयों‍की‍जूस्ट्ुेदारी‍बढ़ान‍े के‍जलए‍बेूतर‍जडजजटल‍और‍दरू ुंचार‍की‍ऄाुंरचना‍नइ‍और‍जाजिष्ट‍ ऄथव्ास्ट्थाओं‍के‍जाकाु‍कज‍बढ़ााा‍देगी। िूर‍के‍भीतर‍माल-ढुलाइ‍ुे‍जुड़ी‍भीड़-भाड़‍कज‍कम‍करने‍के‍जलए‍थजक‍और‍भंडारण‍गजतजाजधयों‍कज‍िूर‍के‍केंद्र‍ु‍े ूटाकर‍बाूरी‍आलाकों‍म‍ें स्ट्थानांतररत‍करना‍ददल्ली‍के‍जलए‍मूत्ापूण‍व लचता‍का‍जाीय‍ू।, ‍ूालांदक‍आनम‍ें ु‍े खतरनाक‍ पदाथव‍ुे‍जड़ु े‍कायवकलाप‍िूर‍ुे‍बाूर‍जा‍चुके‍ू,ैं‍कुछ‍ऄन्य‍गजतजाजधयााँ‍ऄभी‍भी‍चल‍रूी‍ू।ैं ‍ ऄनौपचाररक‍क्षेत्र‍ददल्ली‍का‍ुबुे‍बड़ा‍जनयजि ा‍ू,, जज‍ददल्ली‍के‍लगभग‍70% कमवचाररयों‍कज‍रजजगार‍देता‍ू।, ‍ कायवस्ट्थलों‍की‍गणु ािा‍और‍आु‍क्षेत्र‍के‍जलए‍ऄाुरों‍म‍ें ुधु ार‍लाने‍की‍अाश्यकता‍ू।, ‍ऄनौपचाररक‍ऄथव्ास्ट्था‍के‍ भीतर, मजूला‍काय-व भागीदारी‍में‍ाृजद्ध‍ुएइ‍ू।, ‍जन‍ुुजाधाओं, ्जि गत‍और‍ुामूजूक‍कायव‍के‍ुाथ-ुाथ‍जििु‍देखभाल‍ आत्यादद‍के‍जलए‍स्ट्थान‍की‍्ास्ट्था‍दकए‍जान‍े के‍बारे‍में‍जाचार‍दकया‍जाना‍चाजूए।‍राज्य‍ुरकार‍और‍ुंबंजधत‍एजेंजुयों‍ द्वारा‍पूल‍ें की‍जानी‍ूोंगी‍तादक‍यजजना-ऄाजध‍में‍कमवचाररयों‍का‍कौिल‍स्ट्तर‍ईन्नत‍दकया‍जाना‍ुुजनजित‍दकया‍जा‍ुके‍ जजुुे‍ऄनौपचाररक‍कायवबल‍के‍जलए‍ईभरती‍औपचाररक‍ऄथव्ास्ट्थाओं‍म‍ें ऄजधकाजधक‍अत्मुात‍ूजन‍े के‍बेूतर‍ऄाुर‍ प,दा‍ूज‍ुकें।28 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] आु‍ऄ्याय‍म‍ें अर्नथक‍ईत्पादन‍ऄथावत‍् ्ापार‍और‍ााजणज्य, थजक, ईद्यजग, ुेाा‍और‍ऄनौपचाररक‍क्षेत्र‍के‍मौजूदा‍स्ट्थानों‍ के‍ईन्नयन,‍नए‍अर्नथक‍केन्द्रों‍के‍जाकाु‍के‍जलए‍कायवनीजत‍जनरूजपत‍की‍गइ‍ू‍, जज‍ऄपेक्षाकृत‍स्ट्ाच्छ‍और‍जाजिष्ट‍ ऄथव्ास्ट्थाओं‍कज‍ऄपनाने‍की‍ददिा‍में‍बढ़न‍े तथा‍अर्नथक‍ऄाुरों‍तक‍बेूतर‍पुएचाँ ‍ुुजनजित‍करती‍ूः, ECO:‍अर्नथक‍ईत्पादन‍के‍स्ट्थान ऄ्याय कजड 4.0 अर्नथक‍ईत्पादन‍के‍स्ट्थान ECO 4.1.1 यू‍मख्ु य‍यजजना‍ददल्ली‍की‍अर्नथक‍क्षमता‍ु‍े लाभ‍ईठान‍े के‍जलए‍एक‍ईपयुि ‍परराेि‍प्रदान‍करती‍ू‍, और‍ जाजभन्न‍प्रकार‍के‍कायव‍एां‍कायवस्ट्थल‍की‍्ाख्या‍करता‍ू‍, तादक‍बड़े‍प,माने‍पर‍जनता‍के‍जलए‍ऄाुर‍प,दा‍ूों।‍ आुका‍ईद्देश्य‍औपचाररक‍और‍ऄनौपचाररक‍दजनों‍अर्नथक‍दक्रयाकलापों‍(ुमााेिी‍ऄथव्ास्ट्था)‍की‍ुूायता‍ करके, प्रदीू ण‍पद, ा‍न‍करने‍ााली‍और‍पयावारण-ऄनुकूल‍दक्रयाकलापों‍(स्ट्ाच्छ‍ऄथव्ास्ट्था)‍कज‍बढ़ााा‍देकर‍और‍ ऐुी‍ऄथव्ास्ट्थाओं‍कज‍बढ़ााा‍देकर‍ुंतुजलत‍अर्नथक‍जाकाु‍करना‍ू‍, जज‍क्षेत्रीय‍ुंदभ‍व में‍आु‍िूर‍के‍जलए‍एक‍ ऄनूठी‍भूजमका‍स्ट्थाजपत‍करने‍म‍ेंमदद‍करेगा‍(जाजिष्ट‍ऄथव्ास्ट्था)। 4.1.2 यजजना‍की‍कायवनीजतयााँ‍जनम्नजलजखत‍की‍ुुजाधा‍प्रदान‍करेंगीः i) ऄजधक‍जनाेि‍और‍ऄजधक‍मल्ू य‍ााले‍कारजबार‍एा‍ंुेााओं‍के‍मूत्ापूणव‍केंद्रों‍का‍जनमावण ii) ातवमान‍अर्नथक‍केंद्रों‍का‍ुाोिम‍ईपयजग‍ iii) ऄजनयजजजत‍अर्नथक‍कायवकलापों‍का‍ऄनुमजददत‍स्ट्थलों‍और/या‍ईपयजग‍की‍तरफ‍स्ट्थानांतरण iv) ऄनौपचाररक‍क्षेत्र‍के‍जलए‍बेूतर‍ुुजाधाएं 4.2 अर्नथक‍केंद्रों‍के‍जाकाु‍और‍ुदु ढ़ृ ीकरण‍के‍जलए‍दजृष्टकजण 4.2.1 स्ट्ाच्छ‍ऄथ्व ास्ट्थाओं‍कज‍बढ़ााा‍दने ा:‍यू‍प्लान‍मौजूदा‍मुख्य‍अर्नथक‍क्षेत्रों ज,ुे‍खुदरा‍्ापार, थजक‍ और‍ाेयरूाउलुग, ुंभार-तंत्र, जाजनमावण, ुरकारी‍कायावलयों, बैंककग‍और‍जाि‍म‍ें ुुधार‍लाने, स्ट्ाच्छ‍ ऄथव्ास्ट्था‍ऄपनान‍े और‍मौजूदा‍प्रदीू णकारी‍ईद्यजगों‍कज‍स्ट्थानांतररत‍करन‍े की‍ुुजाधा‍प्रदान‍करन‍े पर‍ केंदद्रत‍ू।, i. ज्ञान‍और‍ ुाआबर‍ ऄथ्व ास्ट्था:‍ ुाआबर‍ ऄथव्ास्ट्था, ईच्च‍ तकनीक‍ ााले‍ रजबजरटक्ु‍ और‍ आलेक्रॉजनक्ु, ज्ञान‍और‍नााचार, ऄनुुंधान‍और‍जाकाु, अदद। ii. एमअइुीइ‍ (बठ, कें, प्रजत्ुाून, ुम्मले न‍ और‍ प्रदिजव नया)ं , ुास्ट्ं कृजतक‍ और‍ रचनात्मक‍ ऄथ्व ास्ट्था:‍एमअइुीइ (MICE) यात्रा‍और‍अजत्य‍के‍जलए‍जाि‍स्ट्तर‍के‍केंद्र, अदद‍ पयवटन, जडजाआन‍और‍फ,िन, प्रकािन, एफ‍एंड‍बी, मीजडया, दश्ृ य‍/‍प्रदिवन‍कला, अदद। iii. स्ट्ाास्ट््य‍ और‍ जिक्षा:‍ ततृ ीयक‍ स्ट्ाास्ट््य‍ देखभाल, जचदकत्ुा‍ ऄनुुंधान‍ और‍ जाकाु, ज,ा- तकनीक, फामाव‍ऄनुुंधान, ईच्च‍जिक्षा, अदद। iv. ूररत‍ऄथ्व ास्ट्था:‍िूरी‍खेती, बागाानी, ुजलर‍फामव, थीम‍पाकव‍अदद।‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 29 v. ुकुवलर‍ऄथ्व ास्ट्था:‍पुनचवक्रण‍और‍मरम्मत‍ऄथव्ास्ट्था, ऄपजिष्ट‍जल‍का‍पुन:‍ईपयजग, पुनचवदक्रत‍ुी‍एडं ‍डी‍ऄपजिष्ट‍ईत्पाद‍(ज,ुे‍फ्लाइ‍ऐि‍जब्रक्ु‍(ईंटें), पुनः‍प्राप्त‍डामर‍फुटपाथ‍ अदद), मल‍कीचड़‍का‍पनु चवक्रण,‍इ-कचरे, प्लाजस्ट्टक‍कचरे‍का‍पुनचवक्रण,‍अदद। 4.2.2 मूत्ापणू ‍व अर्नथक‍केन्द्रों‍कज‍बढ़ााा‍दने ा:‍िूरी‍स्ट्तर‍पर‍अर्नथक‍केन्द्रों‍के‍रूप‍में‍मूत्ापणू व‍क्षेत्रों‍कज‍ जाकजुत‍दकया‍जाएगा।‍बेूतर‍ुाावजजनक‍परराून‍पुएचं , प,दल‍यात्री‍कनेजक्टजाटी‍और‍ुाावजजनक‍ स्ट्थलों‍के‍जनमावण‍के‍जलए‍ुमग्र‍यजजना‍बनाइ‍जाएगी। क) टीओडी‍नजड जनधावररत‍रांजज़ट‍स्ट्टेिनों‍के‍अुपाु‍के‍क्षेत्रों‍कज‍प्रबल‍जमजश्रत-ईपयजग‍जमलन-स्ट्थल‍(नजड)‍के‍ रूप‍में‍जाकजुत‍दकया‍जाएगा।‍ईन्ू‍ें ईन्नत‍प्रौद्यजजगकी, ुंभार-तंत्र, अजत्य, स्ट्ाास्ट््य‍और‍जिक्षा‍ ुमूूों‍के‍रूप‍में‍जाकजुत‍दकया‍जा‍ुकता‍ू‍, तादक‍जाजभन्न‍ुुजाधाओं‍के‍जलए‍ददल्ली‍पर‍क्षत्रे ीय‍ जनभवरता‍की‍अाश्यकताओं‍कज‍पूरा‍दकया‍जा‍ुके। ख) जबजनुे ‍प्रमजिन‍जडजस्ट्रक्ट‍(बीपीडी) i) अर्नथक‍जाकाु‍के‍जलए‍ऄजधक‍क्षमता‍ााले‍मौजूदा‍औद्यजजगक‍क्षेत्रों, जजला‍केंद्रों‍और‍ ुंस्ट्थागत‍क्षेत्रों‍या‍दकुी‍ऄन्य‍क्षेत्र‍की‍पूचान‍की‍जाएगी‍और‍ईन्ू‍ें डीडीए‍द्वारा‍ऐु‍े जबजनेु‍प्रमजिन‍जडजस्ट्रक्ट‍(बीपीडी)‍के‍रूप‍म‍ें ऄजधुूजचत‍दकया‍जाएगा‍जजनके‍काय‍व ुाआबर‍ूब, क्लीन-टेक‍आनजाेिन‍क्लस्ट्टर,‍मीजडया‍और‍जडजाआन‍क्लस्ट्टर, मेडी-जुटी, एजु-जुटी, एमअइुीइ‍ूब, अधुजनक‍लॉजजजस्ट्टक‍ूब‍अदद‍ज,ुे‍ूों। ii) बीपीडी‍का‍न्यूनतम‍जनयजजन‍क्षेत्रफल‍10‍ूक्े टेयर‍ूजगा‍और‍आनका‍जाकाु‍ुुधार‍ यजजनाओं‍के‍प्रााधानों‍के‍ऄनुुार‍दकया‍जाएगा। ग) ग्रीन‍डाे लपमटें ‍एररया‍(जीडीए) जीडीए‍कज‍ग्रीन‍डेालपमेंट‍स्ट्कीम‍के‍प्रााधानों‍के‍ऄनुुार‍ूररत‍ऄथव्ास्ट्था‍(ग्रीन‍आकजनॉमी)‍के‍ ूब‍के‍रूप‍में‍जाकजुत‍दकया‍जाएगा। 4.2.3 एकागं ी‍कायात्व मक‍अर्नथक‍केन्द्रों‍का‍जाजाधीकरण‍और‍पनु ःुधु ारः‍आु‍प्लान‍ुे‍अर्नथक‍केंद्रों‍के‍जाजाधीकरण‍कज‍ बढ़ााा‍जमलेगा‍तादक‍िूर‍म‍ें फलत-े फूलते‍जमजश्रत‍रजजगार‍स्ट्थलों‍का‍जनमावण‍करने‍और‍ऄपेक्षाकृत‍स्ट्ाच्छ,‍ तृतीयक‍क्षेत्र‍के‍कायवकलापों‍की‍ददिा‍में‍जा‍ुकें।‍आुमें‍ुूायक‍कायव‍ज,ुे‍दक‍अजत्य,‍कामकाजी‍मजूलाओं‍और‍ पुरुीों‍के‍ूॉस्ट्टल,‍दकराये‍के‍अााु‍और‍ुेाा-युि ‍ऄपाटवमटें , अराम‍और‍मनजरंजन‍के‍जलए‍स्ट्थान,‍ुाावजजनक‍ स्ट्थल‍अदद‍िाजमल‍ूोंगे। 4.2.4 मौजूदा‍अर्नथक‍केंद्रों‍का‍भी‍पनु ः‍ुुधार‍करके‍और‍परराून‍ुुजाधा, ुाावजजनक‍स्ट्थान, भौजतक‍और‍जडजजटल‍ ऄाुंरचना‍की‍गुणािा‍म‍ेंुुधार‍करके‍ईन्नयन‍दकया‍जाएगा। 4.2.5 काय-व स्ट्थलों‍के‍नए‍रूपों‍का‍जनमाणव : इ-कॉमुव‍के‍जलए‍छजटे‍भांडागार,‍स्ट्टाटव-ऄप‍आकजनॉमी‍के‍जलए‍कज-ार्ककग‍स्ट्पेु‍अदद‍के‍रूप‍में‍जाकेंद्रीकृत‍कायव- स्ट्थलों‍के‍िानदार‍नेटाकव‍की‍ुुजाधा‍ूजगी।‍आुके‍ऄलााा,‍श्रजमकों‍के‍जलए‍ुूायक‍ुुजाधाओं‍के‍जनमावण‍के‍ मा्यम‍ुे,‍यू‍यजजना‍कायव‍के‍ईभरत‍े ुएए‍नए‍रूपों‍कज‍बढ़ााा‍देगी,‍ज,ुे‍दक‍प्लेटफॉमव‍और‍जगग‍ऄथव्ास्ट्था‍ अदद।30 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 4.2.6 राजत्रकालीन‍कायकव लापों‍(एनटीइ) कज‍बढ़ााा‍दने ा: i) मॉडल‍िॉप्ु‍एंड‍एस्ट्टेजब्लिमेंट‍(रेग्यलु ेिन‍ऑफ‍एम्प्लॉयमेंट‍एडं ‍कंडीिंु‍ऑफ‍ुर्नाुेज)‍एक्ट‍2015‍के‍ मा्यम‍ुे‍"24‍घंटे‍कायरव त‍िूर"‍की‍ऄाधारणा‍के‍ुाथ-ुाथ‍राष्ट्रीय‍स्ट्तर‍पर‍एनटीइ‍नीजत‍कज‍बढ़ााा‍ ददया‍जा‍रूा‍ू।, ii) पयवटकों‍और‍स्ट्थानीय‍लजगों‍कज‍अकर्नीत‍करन‍े के‍जलए‍रात‍म‍ें जनरंतर‍कायव‍करने, ुांस्ट्कृजतक‍गजतजाजध‍ और‍मनजरंजन‍के‍जलए‍जमलन-स्ट्थलों‍(नजड), आलाकों‍या‍ुर्दकट‍की‍पूचान‍की‍जाएगी। iii) आु‍प्रकार‍जीांत‍एा‍ं ुदक्रय‍नाआट‍लाआफ‍कज‍बढ़ााा‍जमलने‍ु‍े िूर‍म‍ें कायव‍स्ट्थलों‍का‍ईपयजग‍ूजन‍े और‍ुुरक्षा‍की‍जस्ट्थजत‍बेूतर‍ूजने‍ुे‍अर्नथक‍अय‍म‍ेंुुधार‍ूजगा। 4.2.7 ऄनौपचाररक‍क्षत्रे ‍की‍ुूायता‍करनाः‍आु‍प्लान‍म‍ें ऄनौपचाररक‍दक्रयाकलापों‍की‍ुूायता‍करने‍के‍जलए‍पयावप्त‍ स्ट्थल‍मानदडं ‍और‍ुुजाधाएं‍ू।, ‍ 4.3 ्ापार‍एा‍ंााजणज्य 4.3.1 मरे जपॉजलटन‍जुटी‍ुटें र‍(एमुीुी)/ुरें ल‍जबजनुे ‍जडजस्ट्रक्ट‍(ुीबीडी):‍कनॉट‍प्लेु‍और‍ईुके‍जास्ट्तार‍ ााले‍क्षेत्रों,‍ााल्ड‍जुटी‍और‍करजल‍बाग‍में‍जस्ट्थत‍ााजणजज्यक‍क्षेत्रों‍ने‍परंपरागत‍रूप‍ुे‍ुीबीडी‍की‍ भूजमका‍जनभाइ‍ू‍, और‍यूााँ‍ााजणजज्यक‍गजतजाजधयों,‍कायावलयों, ्ाुायों‍एां‍ुामाजजक-ुांस्ट्कृजतक‍ ुुजाधाओं‍की‍बुएलता‍बरकरार‍ू।, ‍ुीबीडी‍क्षेत्र‍में‍ऄलग-ऄलग‍क्षेत्र‍ूजते‍ू,ैं जजुमें‍प्रत्येक‍का‍ऄनूठा‍ स्ट्ारूप,‍जाजिष्ट‍गजतजाजधयों‍की‍बुएलता‍और‍भााी‍जाकाु‍की‍ुंभााना‍ूजती‍ू।, 4.3.1.1 िूर‍के‍ााजणजज्यक‍मलू ाधार‍कज‍पुनजीजात‍करन‍े के‍जलए‍क्षत्रे -अधाररत‍ुुधार‍दजृ ष्टकजण‍ऄपनाया‍ जाएगा। क) कनॉट‍प्लेु‍(ुीपी)‍और‍ुीपी‍एक्ुटेंिन‍प्रजतजष्ठत‍ूब‍ू‍, और‍आुकी‍जािेीता‍ऐजतूाजुक‍और‍ जाख्यात‍आमारत,ें‍कायावलयों, अजत्य, मनजरंजन, खुदरा‍और‍्ााुाजयक‍गजतजाजधयों‍का‍जाजाध‍ जमला-जुला‍रूप‍ू।, ‍धरजूर‍म‍ें जमली‍आमारतों‍और‍ुाावजजनक‍क्षेत्र‍म‍ें ुुधार‍के‍जलए‍एकीकृत‍ुुधार‍ यजजना‍त,यार‍की‍जाएगी।‍मौजूदा‍ले-अईट‍यजजना‍के‍ऄनुुार‍भूखंडों‍का‍ाूी‍अकार‍रखा‍ जाएगा‍और‍कजइ‍भी‍ईप-जाभाजन‍ऄनुमत‍नूीं‍ूजगा। ख) मंडी‍ूाईु‍ुामाजजक-ुांस्ट्कृजतक‍केंद्र‍के‍रूप‍म‍ें ईभरा‍ू‍, जूां‍ुामाजजक-ुांस्ट्कृजतक‍ुंस्ट्थान, ि,जक्षक‍ुंस्ट्थान, ुरकारी‍कायावलय, राज्य‍भान‍अदद‍जस्ट्थत‍ू।ैं ‍क्षेत्र‍के‍ुंस्ट्थागत‍स्ट्ारूप‍कज‍बनाए‍ रखा‍जाना‍चाजूए‍और‍आुका‍ुंाधवन‍दकया‍जाना‍चाजूए। ग) प्रगजत‍म,दान‍न‍े प्रमुख‍प्रदिनव ी‍और‍एक्ुपज-ुेंटर‍के‍रूप‍म‍ें काम‍करन‍े की‍ऄपनी‍क्षमता‍के‍कारण‍ ऄंतरराष्ट्रीय‍और‍राष्ट्रीय‍मूत्ा‍प्राप्त‍दकया‍ू।, ‍आु‍क्षेत्र‍के‍चल‍रू‍े पुनर्नाकाु‍के‍चलते‍यू ईम्मीद‍ ू‍, दक‍यू‍एमअइुीइ‍(MICE) ूब‍के‍रूप‍म‍ें ईभरेगा।‍क्षेत्र‍में‍ऄस्ट्थायी‍अााु, अजत्य, पार्ककग‍ और‍ुाावजजनक‍स्ट्थलों‍के‍जलए‍पयावप्त‍्ास्ट्था‍ुुजनजित‍की‍जानी‍चाजूए। घ) आंद्रप्रस्ट्थ‍एस्ट्टेट‍ुरकारी‍कायालव यों‍और‍ुंस्ट्थानों‍का‍एक‍ुदक्रय‍केंद्र‍ू।, ‍आु‍क्षेत्र‍कज‍ुस्ट्ं थागत‍ूब‍ के‍ रूप‍ में‍ बनाए‍ रखा‍ जाएगा‍ और‍ बढ़ााा‍ ददया‍ जाएगा।‍ र,दफक‍ भीड़‍ का‍ ुमाधान‍ करने, ुाावजजनक‍स्ट्थान‍कज‍बढ़ान‍े और‍पार्ककग‍का‍प्रबंधन‍करन‍े के‍जलए‍एक‍्ापक‍ुुधार‍यजजना‍त,यार‍ की‍जानी‍चाजूए।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 31 ङ) िाूजूानाबाद‍(ााल्ड‍जुटी)‍एक‍ूरे रटेज‍जजन‍ू‍, जूा‍ं बड़ी‍ुंख्या‍म‍ें धरजूर‍आमारतें‍ू।ैं ‍थजक‍ कारजबार‍ुे‍जुड़ी‍गजतजाजधयों‍कज‍स्ट्थानांतररत‍दकया‍जाएगा‍और‍आु‍क्षेत्र‍में‍ुांस्ट्कृजतक/खुदरा‍ कारजबार‍की‍गजतजाजधयों‍कज‍बढ़ााा‍ददया‍जाएगा।‍ुभी‍ुुधार‍और‍जीणोद्धार‍HCP2‍और‍ DEV3‍के‍प्रााधानों‍के‍ऄनुुार‍दकए‍जाएंगे। च) ााल्ड‍जुटी‍के‍बाूर‍के‍क्षेत्र‍जजुमें‍पूाड़गंज,‍ुदर‍बाज़ार, अज़ाद‍माकेट, बाड़ा‍लूद‍ू राा‍अदद‍ क्षेत्र‍िाजमल‍ू।ैं ‍आन‍क्षेत्रों‍के‍जलए‍पुनः‍ुुधार‍की‍यजजना‍त,यार‍की‍जाएगी।‍जाजिष्ट‍अर्नथक‍ गजतजाजधयााँ‍ज,ुे‍अजत्य‍जजले,‍ाेयरूाउलुग‍और‍थजक‍कारजबार‍के‍जलए‍ा,कजल्पक‍स्ट्थल‍अदद‍ की‍यजजना‍बनाइ‍जा‍ुकती‍ू।, ‍यजजना‍के‍ऄंतगवत‍दकुी‍भी‍प्रकार‍के‍पारंपररक‍बाज़ारों‍या‍ ुांस्ट्कृजतक‍मूत्ा‍के‍ऄन्य‍क्षेत्रों‍कज‍जचजननत‍और‍ुंरजक्षत‍दकया‍जाएगा। छ) करजल‍बाग‍म‍ें प्लॉरटड‍अााुीय‍आलाकों‍के‍ुाथ-ुाथ‍ााजणजज्यक‍क्षेत्रों‍का‍जमला-जुला‍रूप‍ू।, ‍ ऐुे‍क्षेत्रों‍का‍ुीमा-जनधावरण‍करने‍के‍जलए‍एकीकृत‍ुुधार‍यजजना‍त,यार‍की‍जाएगी‍जूा‍ं प्लॉट- जनमावण‍के‍स्ट्ारूप‍कज‍ुंरजक्षत‍करने‍की‍अाश्यकता‍ू , और‍जूां‍पुनःुुधार‍यजजनाओं‍की‍ऄनुमजत‍ दी‍जा‍ुकती‍ू।, 4.3.1.2 र,दफक‍और‍पार्ककग‍प्रबंधन‍की‍्ापक‍यजजना, टूलने‍की‍्ास्ट्था‍में‍ुुधार‍और‍ुाआकल‍ुर्दकट‍ बनाने‍तथा‍एनटीइ‍(नाआट‍टाआम‍आकजनॉमी)‍कज‍प्रजत्ुाजूत‍करन‍े के‍जलए‍यजजना‍त,यार‍करके‍ कायावजन्ात‍की‍जाएगी। 4.3.1.3 जबल्ट-टू-एज‍फ्रंटेज‍कज‍क्षेत्र‍की‍्ापक‍ुुधार‍यजजना‍के‍जूस्ट्ु‍े के‍रूप‍म‍ें त,यार‍दकया‍जाना‍चाजूए‍ और‍जूां‍भी‍्ाूायव‍ूज‍लाग‍ूदकया‍जाना‍चाजूए। 4.3.2 यजजनाबद्ध‍ााजणजज्यक‍क्षत्रे ों‍का‍श्रणे ीकरण जाकजुत‍दकए‍गए‍यजजनाबद्ध‍ााजणजज्यक‍क्षेत्रों‍का‍श्रेणीकरण‍जनम्नानुुार‍ूः, i) जडजस्ट्रक्ट‍ुटें ु‍व (डीुी)‍आन्ू‍ें ईप-ुीबीडी‍बनाने‍की‍यजजना‍बनाइ‍गइ‍ू‍, तादक‍जाजाध‍जािीय‍ ुेााओं, खुदरा‍्ाुाय, कायावलय, मनजरंजन,‍अइटी/अइटीइएु, अजत्य, ुाझा‍और‍ुंबंजधत‍ ईपयजगों‍की‍्ास्ट्था‍की‍जा‍ुके।‍ुाावजजनक‍परराून‍स्ट्टेिनों‍के‍जनकट‍जस्ट्थत‍जजला‍केंद्रों‍कज‍ टीओडी‍(TOD)‍नजड्ु‍के‍रूप‍में‍जाकजुत‍करने‍पर‍जाचार‍दकया‍जा‍ुकता‍ू।, ii) कम्यजु नटी‍ुटें ु‍व (ुीुी)‍खुदरा‍और‍फुरुत‍के‍ुमय‍में‍की‍जाने‍ााली‍खरीदारी, अाश्यक‍ ्ााुाजयक‍ प्रजतष्ठानों, कायावलय‍ स्ट्थानों, जथएटरों‍ अदद‍ के‍ जलए‍ ्ास्ट्था‍ करत‍े ू‍ैं और‍ ुामुदाजयक‍स्ट्तर‍पर‍लजगों‍की‍जरूरतों‍कज‍पूरा‍करत‍े ू।ैं iii) लजकल‍िॉलपग‍ुटें र‍(एलएुुी)‍और‍कम्यजु नटी‍िॉलपग‍ुटें र‍(ुीएुुी)‍म‍ें खुदरा‍स्ट्टजर‍और‍ ्जि गत‍ुेाा‍प्रजतष्ठान‍ूजत‍े ू‍ैं जज‍बार-बार‍ूजने‍ााली‍जरूरतों‍कज‍परू ा‍करते‍ू।ैं ‍ुभी‍ अााुीय‍क्षेत्रों‍के‍जनकट‍ुुजाधाजनक‍स्ट्थानों‍म‍ें ऐुे‍प्रजतष्ठानों‍की‍अाश्यकता‍ूजती‍ू‍, और‍य‍े स्ट्थल‍ुमस्ट्त‍अााुीय‍ईपयजग‍के‍ऄतं गतव ‍जनर्नमत‍दकए‍जात‍े ू।ैं iv) लैंड‍पूललग‍क्षेत्रों‍म,ें ‍ााजणजज्यक‍क्षेत्रों‍का जाकाु DEV1‍के‍जाजिष्ट‍प्रााधानों‍के‍ऄनुुार‍ूजगा।32 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 4.3.3 1962-पाू व ााजणजज्यक‍ क्षत्रे ः‍ एमपीडी-1962 की‍ ऄजधुूचना‍ ु‍े पूल‍े जजन‍ अााुीय‍ क्षेत्रों‍ और‍ ुड़कों/जूस्ट्ुों‍कज‍ााजणजज्यक‍क्षेत्रों/ुड़कों‍के‍रूप‍म‍ें घजजीत‍दकया‍गया‍ू‍, ऄथाा‍जूां‍एमपीडी-1962 में‍ााजणजज्यक‍ईपयजग‍की‍ऄनुमजत‍दी‍गइ‍थी, ऐुा‍ईपयजग‍एमपीडी-1962 में‍स्ट्ाीकायव‍ुीमा‍तक‍ जारी‍रखा‍जाएगा।‍अााुीय‍क्षेत्रों‍में‍1962 ुे‍पूले‍ुे‍चल‍रूी‍्ााुाजयक‍गजतजाजधयों‍कज‍भी‍ दस्ट्तााेजी‍प्रमाण‍प्रस्ट्ततु ‍करने‍के‍ऄ्यधीन‍ऄनुमत‍दकया‍गया‍ू।, 1962 ुे‍पूल‍े जाकजुत‍दकए‍गए‍क्षेत्र‍जज‍ददल्ली‍के‍मास्ट्टर‍प्लान‍म‍ें िाजमल‍नूीं‍थ‍े जूां‍्ााुाजयक‍ गजतजाजधयों‍की‍बुएलता‍ू,, डीुीएन‍के‍ऄनुुार‍(दस्ट्तााेजी‍प्रमाण‍प्रस्ट्तुत‍करने‍के‍ऄ्यधीन) जमजश्रत‍ ईपयजग‍के‍रूप‍में‍जारी‍रू‍ुकते‍ू।ैं ‍ऐुे‍क्षेत्र‍DEV3 के‍प्रााधानों‍के‍ऄनुुार‍पुनः‍ुुधार‍का‍कायव‍भी‍ कर‍ुकते‍ू।ैं 4.3.4 ऄन्य‍ ााजणजज्यक‍ केंद्रः‍ ऄन्य‍ ााजणजज्यक‍ केंद्रों‍ में‍ ऄजधुूजचत‍ ग,र-श्रेणीकरण‍ ााजणजज्यक‍ केंद्र‍ (एनएचुीुी),‍िॉप-कम‍रेजजडेंजियल‍कॉम्प्लेक्ु‍(दकु ान-ुू-अााु‍भूखंड/दकु ान‍भूखंड)‍िाजमल‍ू‍ैं जजन्ू‍ें बाद‍ में‍ कम्युजनटी‍ ुेंटुव‍ (ुीुी)/लजकल‍ िॉलपग‍ ुेंटुव‍ (एलएुुी)/कम्युजनटी‍ िॉलपग‍ ुेंटु‍व (ुीएुुी)‍और‍ऄन्य‍मौजूदा‍दकु ान-ुू-अााु‍भूखंडों‍के‍रूप‍में‍नाजमत‍दकया‍गया‍ू।, ‍ये‍क्षत्रे ‍मानदंडों‍ के‍ऄनुुार‍िाजुत‍ूोंग‍ेऔर‍पनु ःुुधार‍DEV3‍के‍ऄनुुार‍ूजगा। 4.3.5 ााजणजज्यक‍ुड़कें/जमजश्रत‍ईपयजग‍ुड़कें:‍जमजश्रत-ईपयजग‍ााली‍ुड़कों‍या‍ााजणजज्यक‍ुड़कों‍के‍रूप‍म‍ें दकुी‍भी‍नइ‍ऄजधुूचना‍की‍ऄनुमजत‍नूीं‍ूजगी।‍अााुीय‍क्षेत्रों‍के‍भीतर‍ग,र-अााुीय‍ईपयजग‍की‍ ऄनुमजत‍डीुीएन‍(DCN) में‍ददए‍गए‍प्रााधानों‍के‍ऄनुुार‍दी‍जाएगी।‍स्ट्थानीय‍जनकाय/एमटीए‍ मौजूदा‍ुड़कों‍पर‍यातायात‍प्रबंधन,‍पार्ककग‍और‍ुाावजजनक‍स्ट्थानों‍के‍ुुधार‍की‍यजजना‍तय, ार‍करेंगे।‍ स्ट्थानीय‍जनकायों‍द्वारा‍9‍मीटर‍ु‍े कम‍मागावजधकार‍(अरओडब्ल्य)ू ‍की‍ुड़कों‍कज‍केाल‍पद, ल‍चलने‍के‍ जलए‍जनधावररत‍करने‍पर‍जाचार‍दकया‍जाएगा। 4.3.6 ुाे ा‍बाजारः‍ुभी‍अर्नथक‍केंद्र‍डीुीएन‍में‍जनधावररत‍दकए‍ऄनुुार,‍कम‍जबक्री‍ााले‍कारजबार‍की‍ ुूायता‍करने‍के‍जलए‍और‍फलों‍एां‍ुजब्जयों, ुर्नाु‍एां‍ररपेयर कबाड़‍और‍स्ट्क्र,प‍ुामग्री‍(कबाड़ी), ूाडवाेयर‍और‍भान‍जनमावण‍ुामग्री, ऑटजमजबाआल‍ररपेयर‍ाकविॉप‍अदद‍के‍जलए‍बड़े‍क्षेत्र‍में‍फ,ली‍ दकु ानों‍ूते ु‍ऐुी‍ुुजाधाओं‍के‍जलए‍स्ट्थान‍अरजक्षत‍कर‍ुकत‍ेू।ैं 4.4 अजत्य 4.4.1 ददल्ली‍जिक्षा,‍स्ट्ाास्ट््य‍देखभाल,‍पयवटन‍और‍फुरुत‍के‍क्षणों‍म‍ें अनदं दायक‍कायवकलाप, खेल‍और‍ ्ाुाय‍के‍एक‍ऄंतरराष्ट्रीय‍केंद्र‍के‍रूप‍में‍ईभर‍रूी‍ू‍, जूां‍ूजटल‍ुुजाधाओं, जजनमें‍जाजभन्न‍अर्नथक‍ ागों‍के‍जलए‍बजट‍ूजटल, गेस्ट्ट‍ूाईु, लॉलजग‍और‍बजर्मडग‍ूाईु,‍धमविाला,‍ूजटल‍और‍ुर्नालुग‍ ऄपाटवमेंट‍िाजमल‍ू,ैं‍की‍अाश्यकता‍ूजती‍ू।, 4.4.2 अााुीय‍क्षेत्रों‍में‍जनम्नजलजखत‍की‍ऄनुमजत‍ूजगीः 4.4.2.1 ‍अााुीय‍क्षेत्रों‍में‍जमजश्रत‍ईपयजग‍के‍ऄंतगवत‍धमविाला,‍बजट‍ूजटल,‍गस्ट्े ट‍ूाईु, बेड‍एंड‍ ब्रेकफास्ट्ट‍(बीएंडबी),‍बजर्मडग‍लॉलजग‍ुुजाधाओं‍की‍ऄनुमजत‍ूजगी।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 33 4.4.2.2 जनम्नजलजखत‍के‍ऄतं गतव ‍ूजटल/ुर्नास्ट्ड‍ऄपाटवमेंट‍की‍ऄनुमजत‍दी‍गइ‍ू:, i) ुामाजजक-ुांस्ट्कृजतक‍ ुुजाधाएं‍ ज,ुे‍ दक‍ ुम्मले न‍ केंद्र, ुामाजजक‍ ुांस्ट्कृजतक‍ केंद्र, अदद।‍ ii) औद्यजजगक‍और‍थजक‍ईपयजग‍क्षत्रे ों‍में‍ााजणजज्यक‍केंद्र, और iii) परराून‍नजड्ु‍(अइएुबीटी, बु‍जडपज/टर्नमनल, बुए-मजडल‍ूब, रेलाे‍स्ट्टेिन, ूााइ‍ ऄड्डा, एकीकृत‍फ्रेट‍पररुर)।‍ 4.4.2.3 ‍औद्यजजगक‍और‍थजक‍कारजबार‍ईपयजग‍क्षेत्रों‍में‍30‍मी.‍मागावजधकार‍(अरओडब्ल्य)ू पुएचं ‍ााल‍े भूखंडों‍के‍ईपयजग‍पररातवन‍ुे‍ूजटल‍जनर्नमत‍दकए‍जा‍ुकत‍े ू।ैं ‍ऐुे‍मामलों‍म‍ें ऄजधकतम‍ ग्राउंड‍कारेज‍और‍एफएअर‍लागू‍मानदंडों/स्ट्ाीकृत‍जनमावण‍यजजनाओं‍के‍ऄनुुार‍ूजगा,‍ लेदकन‍दकुी‍भी‍जस्ट्थजत‍म‍ें ईु‍ईपयजग-जजन‍के‍ऄनुमेय‍जमीनी‍कारेज‍और‍एफएअर‍ु‍े ऄजधक‍नूीं‍ूजगा। 4.5 थजक‍्ापार 4.5.1 ददल्ली‍ईिर‍भारत‍का‍ुबुे‍बड़ा‍ईपभजग‍केंद्र‍ू।, ‍ऄपनी‍भौगजजलक‍ऄाजस्ट्थजत‍के‍चलत‍े यू‍प्रमुख‍ जातरण‍केंद्र‍का‍दजाव‍भी‍प्राप्त‍कर‍चुका‍ू।, ‍जडजजटल‍जाकाु‍ूजने‍के‍चलते,‍इ-कॉमुव‍एक‍मूत्ापूण‍व कायवकलाप‍के‍रूप‍में‍ईभरा‍ू‍, जजुके‍जलए‍नए‍तरू‍के‍ाेयरूाउलुग‍ुेााओं‍की‍अाश्यकता‍ू।, ‍ डीएफुी‍और‍डीएमअइुी‍जु, े‍माल‍ढुलाइ‍के‍ईभरत‍े क्षेत्रीय‍ऄाुंरचना‍के‍कारण‍जातरण‍केंद्र‍के‍रूप‍ में‍ददल्ली‍की‍प्रधानता‍कम‍ूजने‍और‍थजक‍्ापार‍एां‍ाेयरूाउलुग‍(ाेयरूाईलुग)‍के‍मौजूदा‍रूपों‍म‍ें पररातवन‍ूजन‍े की‍ुंभााना‍ू।, ‍ 4.5.2 मौजूदा‍थजक‍बाजारों‍और‍अइएफुी‍कज‍DEV3‍के‍प्रााधानों‍के‍ऄनुुार‍पुनः‍ुुधार‍करन‍े की‍ऄनुमजत‍ ूजगी।‍आुुे‍भााी‍जरुरतों‍कज‍पूरा‍करन‍े के‍जलए‍अधुजनकीकरण‍की‍ुुजाधा‍ूजगी‍और‍क्षमता‍जास्ट्तार‍ ूजगा। 4.5.3 लैंड‍पूललग‍क्षेत्रों‍और‍जीडीए‍के‍जलए‍थजक‍और‍ाेयरूाउलुग‍ुंबंधी‍अाश्यकताओं‍कज‍अइएफुी‍के‍ भीतर‍परू ा‍दकया‍जाएगा।‍मंजडयों,‍भडं ारण‍और‍कजल्ड‍स्ट्टजरेज‍कज‍जाजिष्ट‍मानदंडों‍के‍ऄनुुार‍ईन्ू‍ें जीडीए‍के‍भीतर‍जाकजुत‍करने‍की‍ऄनुमजत‍दी‍जाएगी‍(देखेः‍DEV2)। 4.5.4 30‍मी.‍मागावजधकार‍(अरओडब्ल्यू)‍ुे‍ुीधे‍पुएचं ‍की‍ुुजाधा‍ााले‍1‍ूक्े टेयर‍और‍ईुुे‍ऄजधक‍के‍ भूखंडों‍पर‍बने‍गजदामों‍कज‍डीुीएन‍के‍ऄनुुार‍खुदरा‍गजतजाजध‍करने‍की‍ऄनुमजत‍ूजगी‍तादक‍जबग‍ बॉक्ु‍खुदरा‍कारजबार‍का‍जाकाु‍दकया‍जा‍ुके।‍ 4.5.5 माल-ढुलाइ‍और‍ुंभाररकी‍के‍जलए‍पररचालन‍ुंबंधी‍अाश्यकताएं‍पूरी‍करने‍के‍बाद‍अइएफुी‍म‍ें ाेयरूाउलुग, गजदामों‍और‍थजक‍कारजबार‍आकाआयों‍एां‍ऄन्य‍गजतजाजधयों‍कज‍िाजमल‍दकया‍जाएगा। 4.5.6 औद्यजजगक‍ईपयजग‍जजन‍के‍भीतर‍औद्यजजगक‍भूखंडों‍कज‍रूपातं ररत‍करके‍भांडागार‍बनाने‍की‍ऄनुमजत‍ डीुीएन‍के‍ऄनुुार‍दी‍जाएगी। 4.5.7 पुराने‍िूर‍के‍भीतर‍चल‍रूी‍ुभी‍ाेयरूाउलुग‍गजतजाजधयों‍और‍थजक‍भडं ारण‍कज‍10 ाीव‍की‍ऄाजध‍ में‍औद्यजजगक‍क्षेत्रों, अइएफुी‍ऄथाा‍थजक‍बाजारों‍ज,ुे‍ऄनुकूल‍क्षेत्रों‍में‍स्ट्थानांतररत‍कर‍ददया‍जाएगा।‍34 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ुंबंजधत‍स्ट्थानीय‍जनकाय‍/‍जीएनुीटीडी‍आु‍तरू‍के‍स्ट्थानांतरण‍कज‍अुान‍बनान‍े के‍जलए‍प्रजत्ुाून‍ यजजनाएं‍िुरू‍कर‍ुकता‍ू।, 4.5.8 पुरान‍े िूर‍के‍जनकटाती‍क्षेत्रों‍ज,ुे‍ुदर‍बाजार‍म‍ें पुनः‍ुुधार‍ूते ‍ु ाेयरूाउलुग‍और‍ूजटल‍जु, ‍े ईपयजग‍की‍ऄनुमजत‍दी‍जाएगी‍तादक‍पुरान‍े िूर‍के‍्ाुायों‍की‍अाश्यकताओं‍कज‍परू ा‍दकया‍जा‍ ुके। 4.5.9 ऄजनयजजजत/गर, -ऄनरूु प‍गजदाम‍ुमूू ः‍ददल्ली‍में‍गजदामों/भण्डारण‍के‍कइ‍ऄजनयजजजत‍क्लस्ट्टर‍जाकजुत‍ ुएए‍ू।ैं ‍ऐुे‍क्षेत्रों‍का‍जनयजमतीकरण‍और‍जनयजजजत‍पनु ः‍ुुधार‍DEV3‍के‍ऄनुुार‍ूजगा‍और‍5‍ाीव‍की‍ ऄाजध‍के‍भीतर‍परू ा‍दकया‍जाएगा।‍जज‍ुमूू‍आुम‍ें िाजमल‍नूीं‍ूजते‍ू,, ईन्ू‍ें जचजननत‍औद्यजजगक‍क्षेत्रों, अइएफुी‍ऄथाा‍थजक‍बाजारों‍में‍ऄजनाायव‍रूप‍ुे‍स्ट्थानांतररत‍दकया‍जाएगा।‍ 4.6 ईद्यजग 4.6.1 ददल्ली‍में‍मौजूदा‍जनयजजजत‍औद्यजजगक‍क्षेत्रों‍की‍ुूची‍ऄनुबंध‍3 में‍दी‍गइ‍ू।, ‍ऐुे‍क्षेत्रों‍का‍पुनःुुधार‍ DEV3 में‍ददए‍गए‍प्रााधानों‍के‍ऄनुुार‍ूजगा।‍डीएुअइअइडीुी/स्ट्थानीय‍ईद्यजग‍ुंघों‍द्वारा‍पार्ककग, ुाावजजनक‍स्ट्थान, ूररयाली‍और‍ुीइटीपी‍ज,ुी‍ुामान्य‍ुुजाधाओं‍के‍जाकाु‍के‍जलए‍ऐु‍े मौजूदा‍क्षेत्रों‍ कज‍भी‍जलया‍जा‍ुकता‍ू।, 4.6.2 ग्रुप‍ ूाईलुग,‍ पीएुपी,‍ ााजणजज्यक‍ और‍ ाेयरूाउलुग‍ ईपयजग‍ म‍ें रूपांतररत‍ करने‍ की‍ ऄनुमजत‍ डीुीएन‍में‍ददए‍गए‍जाजिष्ट‍प्रााधानों‍के‍ऄनुुार‍दी‍जाएगी। ज्ञान‍अधारीत‍ईद्यजगों‍और‍्ााुाजयक‍ जिक्षा‍केंद्रों‍में‍पररातनव ‍की‍ऄनुमजत‍दी‍जाएगी‍ताकी‍ईद्यजग‍और‍जिक्षा‍ऄकादजमयों‍के‍बीच‍ुामंजस्ट्य‍ ूज‍ुके।‍नए‍प्रकार‍के‍जबग‍बॉक्ु‍ररटेल‍की‍ुुजाधा‍भी‍ूजगी। 4.6.3 औद्यजजगक‍क्षेत्रों‍म‍ें स्ट्टाट-व ऄप‍और‍नााचार‍क्लस्ट्टर‍जनर्नमत‍करने‍की‍ुुजाधा‍देने‍के‍जलए, औद्यजजगक‍ भूखंडों‍पर‍जबना‍दकुी‍ईपयजग-पररातवन‍के, एफएअर‍के‍10% तक‍कज-ार्ककग‍स्ट्थान‍जनर्नमत‍करन‍े की‍ ऄनुमजत‍दी‍जाएगी। 4.6.4 नए‍औद्यजजगक‍क्षेत्रों‍(डीएुअइअइडीुी‍द्वारा‍जाकाु‍के‍जलए‍प्रस्ट्ताजात‍और/ऄथाा‍लडैं ‍पलू लग‍क्षेत्रों‍ में‍जाकजुत)‍कज‍स्ट्ाच्छ‍ईद्यजग‍के‍ूब‍के‍रूप‍म‍ें जाकजुत‍दकया‍जाएगा‍ज,ुे‍दक‍जबजनेु‍पाकव, टेक-पाकव‍ और‍ुाआबर‍ूब, नॉलेज, अरएडं डी, ुांस्ट्कृजतक‍ईद्यजग/मीजडया‍क्लस्ट्टर।‍ 4.6.5 जनजीद्ध‍श्रणे ी‍के‍तूत‍ुूचीबद्ध‍ईद्यजगों‍कज‍ददल्ली‍में‍चलान‍े की‍ऄनुमजत‍नूीं‍दी‍जाएगी‍ज,ुादक‍ऄनुबंध‍ 1‍म‍ें जनधावररत‍दकया‍गया‍ू।, ‍जनजीद्ध‍श्रेणी‍के‍तूत‍दकन्ूी‍भी‍मौजूदा‍औद्यजजगक‍आकाआयों‍कज‍ददल्ली‍ु‍े बाूर‍स्ट्थानांतररत‍करना‍ूजगा‍या‍5‍ाीव‍की‍ऄाजध‍के‍भीतर‍स्ट्ाच्छ‍जाजनमावण/ईत्पादन‍कायव‍िुरू‍ करना‍अाश्यक‍ूजगा।‍ 4.6.6 बंगला‍ज़जन‍(नइ‍ददल्ली‍और‍जुजाल‍लाआंु), ररज, ररार‍बेड‍(जजन-ओ), जलाियों, नूरों‍के‍जनकटाती‍ क्षेत्रों, ुुरक्षा‍की‍दजृ ष्ट‍ुे‍ुंाेदनिील‍क्षेत्रों, ुुरजक्षत/‍ुंरजक्षत‍ान, कज-ओपरेरटा‍ग्रुप‍ूाईलुग‍ुजुायटी,[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 35 डीडीए‍ूाईलुग, जनता‍फ्ल,ट्ु‍कज‍छजड़कर‍ग्रपु ‍ूाईलुग, ुरकारी‍फ्ल,ट‍/‍बंगले‍/‍जनयजि ा-प्रदि‍ अााु‍अदद‍म‍ेंदकुी‍औद्यजजगक‍कायवकलाप‍की‍ऄनुमजत‍नूीं‍दी‍जाएगी। 4.6.7 1962‍ु‍े पूल‍े के‍औद्यजजगक‍क्षत्रे ः‍1962 ुे‍पूल‍े के‍औद्यजजगक‍क्षेत्र‍या‍जूा‍ाँ एमपीडी-1962 में‍ औद्यजजगक‍ईपयजग‍की‍ऄनुमजत‍दी‍गइ‍थी, दस्ट्तााेजी‍प्रमाण‍प्रस्ट्तुत‍करन‍े की‍ित‍व पर, एमपीडी-1962 में‍स्ट्ाीकायव‍ूद‍तक‍प्रचालन‍जारी‍रखगें े।‍ऐु‍े क्षेत्रों‍का‍कजइ‍भी‍पुनःुुधार‍DEV3 के‍प्रााधानों‍के‍ ऄनुुार‍ूजगा। 4.6.8 घरेल‍ू ईद्यजगः‍घरेल‍ू ईद्यजगों‍कज‍डीुीएन‍के‍प्रााधानों‍के‍ऄनुु ार‍अााुीय‍पररुर‍ुे‍ुंचाजलत‍करन‍े की‍ऄनुमजत‍दी‍जाएगी।‍ऄनुमत‍घरेल‍ूईद्यजगों‍की‍ुूची‍ऄनुलग्नक‍4‍और‍5‍म‍ें दी‍गइ‍ू।, 4.6.9 ऄजनयजजजत/गर, -ऄनरूु प‍औद्यजजगक‍क्षत्रे ः‍ददल्ली‍म‍ें कइ‍ऄजनयजजजत‍औद्यजजगक‍क्षेत्र‍जाकजुत‍ूज‍गए‍ूैं।‍ ऐुे‍क्षेत्रों‍का‍जनयजमतीकरण‍और‍जनयजजजत‍पनु ःुुधार‍DEV3‍के‍ऄनुुार‍ूजगा‍और‍5‍ाी‍वकी‍ऄाजध‍के‍ भीतर‍परू ा‍दकया‍जाएगा।‍जज‍ुमूू‍आुमें‍िाजमल‍नूीं‍ूजते, ईन्ू‍ें जचजन्ूत‍क्षेत्रों‍म‍ें ऄजनाायवतः‍ स्ट्थानांतररत‍दकया‍जाएगा।‍ 4.7 ुरकारी‍कायालव य 4.7.1 ददल्ली‍में‍भारत‍ुरकार, राष्ट्रीय‍राजधानी‍क्षेत्र‍ददल्ली‍ुरकार‍(जीएनुीटीडी)‍और‍स्ट्थानीय‍जनकायों‍के‍ कायावलय‍जस्ट्थत‍ू।ैं ‍ऄजधकतर‍कायावलय‍और‍न्यायालय‍पररुर‍स्ट्ातंत्रता‍के‍ठीक‍बाद‍स्ट्थाजपत‍दकए‍गए‍ थे‍और‍ईन्ूोंन‍े भ-ू ुंपजि‍का‍पूरी‍तरू‍ु‍े ईपयजग‍नूीं‍दकया‍था।‍यू‍क्षेत्र‍िूर‍के‍जलए‍प्रमुख‍ ऄथव्ास्ट्था‍और‍रजजगार‍प,दा‍करने‍का‍स्रजत‍रूगे ा। 4.7.2 मौजूदा‍ुरकारी‍भूजम‍का‍ुाोिम‍ईपयजग‍DEV3‍के‍प्रााधानों‍के‍ऄनुुार‍पुनःुुधार‍करके‍दकया‍ जाएगा।‍आुके‍पररणामस्ट्ारूप‍अधुजनक‍बुएमंजजला‍कायावलय‍पररुरों‍का‍जनमावण‍ूज‍ुकेगा‍जजुम‍ें पयावप्त‍ुुजाधाएं‍ूों‍ज,ुे‍दक‍कमचव ारी-अााु,‍ााजणजज्यक‍ुुजाधाएं‍अदद। 4.7.3 लैंड‍पूललग‍क्षेत्रों‍म,ें ुरकारी‍कायावलयों‍और‍न्यायालय‍पररुरों‍कज‍यथाुंभा‍एकीकृत‍कायावलय‍पररुर‍ के‍रूप‍में‍और‍एमअरटीएु‍कॉरीडजर‍के‍अुपाु‍जाकजुत‍दकया‍जाएगा। 4.7.4 ााजणजज्यक‍और‍औद्यजजगक‍क्षत्रे ों‍में‍ुरकारी‍कायावलय‍ुमूूों‍और‍न्यायालय‍पररुरों‍के‍जनमावण‍की‍भी‍ ऄनुमजत‍दी‍जाएगी।‍टीओडी‍पररयजजनाएं‍्ााुाजयक‍घटक‍के‍भीतर‍ूी‍और‍स्ट्टेिन‍जाकाु‍के‍ऄंतगतव ‍ ऐुी‍ुुजाधाएं‍प्रदान‍कर‍ुकती‍ू‍ैंजजनुे‍बेूतर‍जन-परराून‍ुंपकव‍ईपलब्ध‍ूज‍ुकेगा। 4.7.5 ुरकारी‍कायावलयों‍और‍न्यायालय‍पररुरों‍ााल‍े क्षेत्रों‍कज‍प्राथजमकता-प्राप्त‍एटीए‍(एजक्टा‍रेाल‍ एररयाज)‍के‍रूप‍में‍माना‍जाएगा‍(देखें:‍MOB3)।‍जूा‍ं भी‍ुंभा‍ूज, स्ट्ट,क‍पार्ककग‍का‍प्रााधान‍दकया‍ जाएगा।‍ 4.8 ऄनौपचाररक‍ऄथ्व ास्ट्था36 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 4.8.1 ऄनौपचाररक‍क्षेत्र‍की‍आकाआयााँ‍ऄपने‍अप‍कज‍ााजणजज्यक/औद्यजजगक‍क्षेत्रों‍के‍पाु‍ऄाजस्ट्थत‍करती‍ूैं, ज,ुे‍दक‍थजक,‍गजदाम,‍पीएुपी‍ुुजाधाएं,‍कायावलय‍और‍परराून‍केंद्र‍जज‍मूत्ापूणव‍ुूायता‍ुेााएं‍ प्रदान‍करते‍ू।ैं ‍आन‍पर‍जनम्नजलजखत‍प्रााधान‍लाग‍ूूोंगेः i) ऄनौपचाररक‍क्षेत्र‍की‍आकाआयों‍कज‍ईपयुि ‍स्ट्थान‍देने‍के‍जलए‍डीुीएन‍के‍प्रााधानों‍के‍ऄनुु ार‍ जाजभन्न‍भूखंडों/ल-े अईट‍प्लान‍के‍जररये‍जबक्री-कारजबार‍(ाेंलडग)‍क्षेत्र‍प्रदान‍दकए‍जाएगं े।‍ऐुी‍ आकाआयों‍का‍प्रााधान‍भान‍यजजनाओं/‍ल-े अईट‍प्लान‍के‍ऄनुमजदन‍के‍ुमय‍ुुजनजित‍दकया‍ जाएगा। ii) जूां‍भी‍्ाूायव‍ूज, ऄनौपचाररक‍गजतजाजधयों‍कज‍ुमूूबद्ध‍करने‍कज‍बढ़ााा‍ददया‍जाएगा‍और‍ ईपयुि ‍ऄाुंरचना‍का‍जनमाणव ‍करके‍आुमें‍ुुजाधा‍दी‍जाएगी।‍आु‍तरू‍के‍क्लस्ट्टर‍ुाप्ताजूक‍ बाजारों‍की‍तरू‍ऄस्ट्थायी‍ूज‍ुकते‍ू‍ैं या‍ऄजधक‍स्ट्थायी‍रूप‍ले‍ुकते‍ू‍ैं ज,ुेदक‍‍तू-बाजारी‍ ्ास्ट्था‍या‍थीम-अधाररत‍ूाट।‍स्ट्थानीय‍जनकाय‍ऐु‍े ुमूूों‍(क्लस्ट्टर)‍के‍जलए‍ईपयुि ‍स्ट्थलों‍ का‍पता‍लगाएगं े। iii) स्ट्रीट‍जडजाआन‍जाजनयमों‍के‍ऄनुुार, ुड़क‍ुुधार‍के‍ुाथ-ुाथ‍नइ‍ुड़कों‍के‍जनमावण‍में‍बुए- ईपयजजगता‍जजन‍भी‍िाजमल‍ूोंगे‍तादक‍ऄनौपचाररक‍गजतजाजधयों‍कज‍स्ट्थान‍ददया‍जा‍ुके।‍ जचजननत‍ुदक्रय‍यात्रा‍क्षेत्रों‍के‍जलए‍त,यार‍यजजनाओं‍म‍ें जबक्री‍(ाेंलडग)‍और‍कजइ‍जबक्री‍नूीं‍(नज‍ ाेंलडग)‍ााले‍क्षेत्रों‍की‍स्ट्पष्ट‍रूप‍ुे‍ुीमा‍जनधावररत‍की‍जाएगी‍(देखें:‍MOB3)। iv) जबक्री‍कारजबार‍करने‍के‍जलए‍ुभी‍जनर्ददष्ट‍स्ट्थानों‍पर‍जन-ुुजाधाएं‍(पुरुीों‍और‍मजूलाओं‍के‍ जलए‍ऄलग-ऄलग‍िौचालय,‍पजिाक‍बदलने‍के‍कमरे,‍जिि‍ु दखे रेख‍ुुजाधाएं)‍और‍ठजु‍कचरे‍की‍ जनपटान‍्ास्ट्था‍की‍ुुजाधाएं‍दी‍जाएंगी। 4.8.2 यदद‍्ाूायव‍ूजगा‍तज‍ऄनजधकृत‍कॉलजजनयों, िूरी‍गांाों‍और‍मजलन‍बजस्ट्तयों‍के‍पुनःुधु ार‍ऄथाा‍ ुुधार‍के‍ऄंतगवत‍बुए‍ईपयजगी‍ुामुदाजयक‍कायव‍केंद्रों/कायव‍स्ट्थलों‍की‍्ास्ट्था‍की‍जाएगी।‍(देख:ें‍ DEV3) --- x --- x ---- x --- x ---[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 37 खडं ‍3 धरजूर, ुस्ट्ं कृजत‍और‍ुााजव जनक‍स्ट्थल पष्ृ ठ‍भजू म‍और‍प्रमखु ‍नीजतगत‍ुरजकार जनर्नमत‍धरजूर:‍ददल्ली‍दजु नया‍के‍ुबुे‍पुरान‍े बुे‍िूरों‍में‍ु‍े एक‍ू,, और‍आजतूाु‍म‍ें यूां‍बुएत-ुी‍बजस्ट्तयां‍रूी‍ू।, ‍यूा‍ं बुएत-ुारी‍धरजूर‍ुंपजियां‍ू‍ैं और‍जाि‍की‍मल्ू याान‍धरजूरों‍के‍बुएल‍क्षेत्र‍ू‍ैं एां‍एक‍जािेी‍मलू ाािेीों‍का‍प्रदिे ‍ू‍, जूां‍ुंस्ट्कृजत‍और‍धरजूर,‍जनमानु‍की‍गजतजाजधयों‍ुे‍एकीकृत‍ू।, ददल्ली‍में‍जाि‍धरजूर‍स्ट्थल,‍केंद्र‍ुंरजक्षत‍स्ट्मारक, राज्य‍ुंरजक्षत‍स्ट्मारक‍ू‍ैं और‍ऄन्य‍स्ट्थानीय‍ुूचीबद्ध‍धरजूर‍और‍ग,र- ुूचीबद्ध‍धरजूर‍ुंपजियां‍ू;ैं ‍‍आनमें‍ुे‍कुछ‍धरजूर‍भान‍और‍राष्ट्रीय‍मूत्ा‍के‍ऄािीे ‍ऄब‍जालुप्‍त‍ूज‍गए‍ू‍ैं और‍ऄब‍ आनका‍पता‍लगाया‍जाना‍ुंभा‍नूीं‍ू।, ‍स्ट्‍थानीय‍जनकायों‍द्वारा‍ऄजधुूजचत‍ऄजधकांि‍धरजूर‍भान‍जनजी‍स्ट्‍ााजमत्‍ा‍में‍ू‍ैं और‍ऄजधभजगी‍आनका‍ुदक्रय‍ईपयजग‍कर‍रूे‍ू।ैं ‍मरम्‍मत‍न‍दकए‍जाने,‍ऄुगं त‍ईपयजग‍और‍ुंपजि‍के‍पूण/व अंजिक‍ ऄुंाेदी‍पुनर्ननमावण‍के‍कारण‍आनमें‍ुे‍कइ‍भानों‍कज‍गंभीर‍खतरा‍ू।, ‍ुभी‍धरजूर‍ुंपजियों‍का‍तत्काल‍ुंरक्षण‍और‍ जनगरानी‍दकए‍जाने‍की‍अाश्यकता‍ू।, ददल्ली‍की‍जनर्नमत‍धरजूर‍मख्ु य‍रूप‍ुे‍यमनु ा‍और‍ररज‍के‍बीच‍बने‍जत्रकजण‍म‍ें जजन‍ए, ुी,‍डी,‍और‍एफ‍में‍केंदद्रत‍ू।, ‍ आनमें‍ुे‍कइ‍िूर‍का‍ऄनूठा‍ुांस्ट्कृजतक‍केंद्र‍बनाए‍जाने‍यजग्‍य‍ू।ैं ‍आनमें‍ुे‍कइ‍प्राकृजतक‍ुंपदाओं‍ज,ुे‍जल‍स्रजतों‍और‍ जंगलों‍ुे‍जुड़ी‍ुएइ‍ू,ैं जजनुे‍एकीकृत‍यजजना‍के‍ऄाुर‍ददखाइ‍देते‍ू।ैं ‍आनमें‍ुे‍कइ‍ऐजतूाजुक‍क्षेत्रों‍में‍अज‍जमजश्रत‍ ईपयजग‍प,टन‍व ााली‍घनी‍बजस्ट्तयां‍ू‍ैं और‍आनमें‍ााजणजज्यक‍गजतजाजधयां‍ूज‍रूी‍ू‍ैं और‍ऄजतक्रमण‍की‍ुमस्ट्याएं‍ूज‍रूी‍ू‍ैं तथा‍ ूर, ीटेज‍ ुम्पदा‍ कज‍ नजरऄंदाज‍ दकया‍ जा‍ रूा‍ ू‍, ज,ुे‍ िाूजूानाबाद, जनज़ामुद्दीन, मूरौली, तुगलकाबाद, जूााँपनाू, ूौज़‍खाु‍और‍लुरटयन्‍ु‍ददल्ली‍जूां‍ददल्‍ली‍के‍कुछ‍ऄत्यंत‍मूत्ापूणव‍प्रतीक‍ू।ैं ददल्ली‍कज‍ऄथव्ास्ट्था‍कज‍बढ़ााा‍देने‍और‍ऄनुकूली‍पुन:‍ईपयजग‍ज,ुे‍ईपायों‍ुे‍ऄनूठे‍ुांस्ट्कृजतक‍और‍ुाावजजनक‍स्ट्थलों‍ कज‍ुमृद्ध‍करन‍े के‍जलए‍आु‍ुुदढ़ृ ‍ुांस्ट्कृजतक‍पूंजी‍का‍ईपयजग‍करने‍की‍कायवनीजत‍बनानी‍ूजगी।‍ूालााँदक, कुछ‍िूरी‍गााँाों‍ में‍ऐुे‍स्ट्‍थलों‍के‍पाु‍कइ‍बुरटक‍प्रजतष्ठ‍ान,‍कलाकार‍स्ट्टूजडयज‍और‍ऄन्य‍रचनात्मक‍आकजनजमीज‍स्ट्थाजपत‍दकए‍गए‍ू‍, और‍ ुांस्ट्कृजतक‍ईत्ुा, फूड‍ाॉक, ूरे रटेज‍ाॉक‍अदद‍ज,ुी‍पूल‍ें ईभर‍कर‍ुामने‍अइ‍ूैं, लेदकन‍आन‍ुभी‍गजतजाजधयों‍की‍ प्रकृजत‍एक‍्ाजस्ट्थत‍तरीके‍ुे‍पयवटन‍और‍धरजूर‍के‍ऄनभु ा‍कज‍बढ़ान‍े ु‍े जुड़ी‍ूजन‍े के‍बजाय‍जछटपुट‍ूी‍ू।ैं ‍धरजूर‍ ुंपजि‍के‍ऄलााा, ददल्ली‍में‍लडैं माकव‍भान‍(बेकार‍पड़े‍औद्यजजगक‍स्ट्थ‍ ल/‍जाद्युत‍ुंयत्र)‍भी‍ू।ैं ‍ऐुी‍ुंपजियों‍कज‍िूर‍की‍ अधुजनक‍और‍औद्यजजगक‍धरजूर‍के‍स्ट्‍ारूप‍में‍स्ट्ाीकार‍दकए‍जाने‍और‍ईन्ू‍ेंुंरक्षण‍और‍ुांस्ट्कृजतक‍ुंाधवन‍के‍दायरे‍में‍लान‍े की‍अाश्‍यकता‍ू।, ददल्ल‍ ी‍म‍ें ुााजव जनक‍स्ट्थल:‍आु‍िूर‍म‍ें बुएत-ुारे‍ुाावजजनक‍स्ट्थल‍ू‍ैं जज‍ुांस्ट्‍कृजतक,‍ुामाजजक‍और‍अर्नथक‍तौर‍पर‍ मूत्‍ापूणव‍ू।ैं ‍य‍े गजतजाजध‍स्ट्‍थल‍और‍नेटाकव‍के‍रूप‍म‍ें ू‍ैं जजनुे‍ददल्ल‍ ी‍म‍ें जनजीान‍और‍भी‍ऄजधक‍जीांत‍ूज‍जाता‍ू।, ‍ ददल्ली‍की‍ुाावजजनक‍स्ट्‍थलों‍की‍टाआपजलजजी‍बुएत‍जाजाध‍ू,ैं‍आुमें‍प्रजतजष्ठत‍िूर‍स्ट्तरीय‍ूब, पाकव‍और‍आंजडया‍गेट, ुीपी‍में‍ुेंरल‍पाकव‍और‍नेूरू‍पाकव‍ज,ुे‍खुले‍स्ट्‍थान‍ुे‍लेकर‍बड़ी‍ुामाजजक‍और‍ुांस्ट्कृजतक‍ुुजाधाएं,‍चारदीाारी‍िूर‍के‍ पारंपररक‍/‍ऐजतूाजुक‍बाज़ार, ददल्ल‍ ी-ूाट,‍ज,ुी‍थीम‍ुाआट‍माकेट‍ज,ुे‍जनपथ‍स्ट्‍रीट,‍ुंुद‍मागव‍पर‍एम्पजररया‍क्षेत्र, और‍स्ट्थानीय‍पाकव, चौक‍और‍ुड़कें‍ू।ैं ‍आनके‍ऄजतररक्त‍ ,‍रचनात्मक‍कलाओं‍के‍मंडी‍ूाईु‍ज,ुे‍जाजभन्‍न‍स्ट्थ‍ ान,‍जलािय,‍ यमुना‍बाढ़‍के‍म,दान‍और‍धरजूर‍ुंपजि‍की‍बुएलता‍ााल‍े क्षेत्र‍स्ट्‍ाय‍ं आु‍िूर‍के‍ुांस्ट्कृजतक‍और‍ुाावजजनक‍जीान‍के‍ मूत्ापूणव‍तत्ा‍ू।ैं38 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ुभी‍ुाावजजनक‍स्ट्थलों‍और‍स्ट्थानों‍कज‍ुभी‍ईपयजगकतावओं,‍जािेी‍रूप‍ुे‍ददव्‍यागं ों,‍गभवाती‍मजूलाओं, बुजुगों‍और‍बच्चों‍ के‍जलए‍ुरु जक्षत,‍ऄजधक‍ुमााेिी‍और‍जीांत‍बनाने‍के‍जलए‍ुाावजजनक‍क्षेत्र‍के‍दायरे‍कज‍बढ़ाने‍की‍अाश्यकता‍ू,। ददल्ली‍के‍जलए‍(i) लैंडमाकों, प्रजतजष्ठत‍स्ट्थानों‍और‍जाजुऄल‍कॉररडार‍जज‍ुाावजजनक‍ऄनुभा‍कज‍बेूतर‍करन‍े के‍जलए‍िूर‍ की‍पूचान‍ू,ैं‍और‍(ii) जनुुजाधाओं‍में‍ुुधार‍और‍ुंस्ट्‍थापना‍के‍जलए‍क्षेत्रों/ुड़कों,‍की‍पूचान‍करने‍के‍जलए‍ुाावजजनक‍ स्ट्थलों‍की‍ुूची‍बनान‍ेकी‍अाश्यकता‍ू।, आु‍खंड‍में‍िूर‍की‍धरजूर‍कज‍ुंरजक्षत‍करने‍और‍ईुका‍लाभ‍लेने‍और‍जनम्न‍ जलजखत‍दज‍ऄ्‍यायों‍में‍िूर‍के‍ुाावजजनक‍ क्षेत्र‍कज‍बढ़ाने‍की‍कायवनीजतयां‍जनधावररत‍की‍गइ‍ू:, एचुीपी1‍-‍ुााजव जनक‍स्ट्थलों‍का‍बूे तर‍प्रबधं न‍करना‍ एचुीपी1‍–‍ददल्ली‍की‍धरजूर‍का‍प्रबधं न ऄ्याय कजड HCP1 5.0 ुााजव जनक‍स्ट्थ‍ लों‍का‍बूे तर‍प्रबधं न‍करना 5.1.1 यजजना‍का‍ईद्देश्य,‍आु‍िूर‍म‍ें जीांत‍ुाावजजनक‍क्षेत्र‍कज‍बढ़ााा‍देने‍के‍जलए‍ुाावजजनक‍स्ट्थलों‍ुे‍जुड़ी‍ ऄाुंरचना‍की‍ुुरक्षा, ऄजतक्रमण‍और‍आुके‍ऄभाा‍के‍मुद्दों‍का‍भलीभांजत‍ुमाधान‍करना‍ू।, ‍आुुे‍बेूतर‍ पदयात्रा,‍ ुाावजजनक‍ जीान, ुामाजजक‍ जुड़ाा,‍ स्ट्ाास्ट््य, रचनात्मकता‍ और‍ स्ट्थानीय‍ ्ाुायों, खुदरा, ुांस्ट्कृजतक‍ऄथव्ास्ट्थाओं‍कज‍प्रजत्‍ुाजूत‍करने‍के‍यजजना‍के‍ुभी‍तीन‍लक्ष्यों‍के‍ऄुंख्‍य‍लाभ‍जमलेंगे। 5.1.2 'ुाावजजनक‍क्षेत्र' िब्द‍कज‍एक‍ऄजनाायव‍िूरी‍ुाझा‍स्ट्थ‍ ान‍माना‍जाता‍ू‍, जजनमें‍ईु‍िूर‍में‍ुाझा‍ ुाावजजनक‍क्षेत्र‍िाजमल‍ू‍ैं जज‍ुभी‍के‍ू‍ैं और‍ुभी‍के‍जलए‍ुुलभ‍ू।ैं ‍आु‍यजजना‍में‍तीन‍तत्ा‍ ों‍ऄथावत‍ुड़कों, ुाावजजनक‍और‍जनजी‍प्लाजा /‍चौराूों, पाकव‍और‍खलु ‍े स्ट्थ‍ ानों‍पर‍जािेी‍फजकु‍करत‍े ुएए‍जनम्नजलजखत‍की‍ पररकल्‍पना‍की‍गइ‍ू:, i) पूरे‍िूर‍म‍ें भलीभांजत‍जडजाआन‍दकए‍गए, ुुरजक्षत‍और‍ुुव्‍याजस्ट्थत‍ुाावजजनक‍स्ट्थलों‍की‍बेूतर‍ ईपलब्धता‍और‍ऄनुभा। ii) बेूतर‍माग-व स्ट्‍तरीय‍गजतजाजध‍और‍ुुरक्षा‍ााल‍ेभानों‍और‍ुाावजजनक‍क्षेत्रों‍के‍बीच‍बेूतर‍आंटरफेु। 5.2 ुााजव जनक‍जीान‍के‍जलए‍िूर‍स्ट्तरीय‍ूब‍और‍नटे ाकव‍कज‍ुमद्धृ ‍बनाना 5.2.1 िूर‍म‍ें ुाावजजनक‍जीान‍कज‍बेूतर‍बनान‍े के‍जलए‍एक‍मूत्ापूणव‍कायवनीजत‍बड़े, प्रजतजष्ठत‍ुाावजजनक‍ क्षेत्रों‍और‍ऐुे‍लैंडमाकों‍कज‍ुमृद्ध‍बनाना‍ू‍, जज‍आु‍िूर‍की‍छजा‍का‍ऄंग‍ू।ैं ‍जबदक‍यजजना‍में‍कुछ‍नए‍ ऄाुरों‍की‍पूचान‍की‍गइ‍ू‍, जज‍ुृजजत‍दकए‍जा‍ुकते‍ूैं, ऐुे‍कइ‍क्षेत्र‍पूल‍े ुे‍ूी‍िूर‍में‍मौजूद‍ू‍ैं और‍ जाजभन्‍न ुाावजजनक‍गजतजाजधयों‍की‍ुूायता‍के‍जलए‍आनमें‍बेूतर‍ुुजाधाओं‍और‍जडजाआन‍के‍मा्यम‍ु‍े ुुधार‍करन‍े की‍अाश्यकता‍ूजगी। 5.2.2 िूरी‍केंद्र:‍िूर‍स्ट्तरीय‍ूब‍की‍जनम्नजलजखत‍टाआपजलजजी‍कज‍प्राथजमकता‍के‍अधार‍पर‍जाकजुत/ईन्‍नत‍ दकया‍जाएगा: i) ुााजव जनक‍तटीय‍नगरभाग‍(पजब्लक‍ााटरफ्रंट):‍यजजना‍म‍ें यमुना‍बाढ़‍के‍क्षेत्र‍म‍ें पयावारण‍के‍प्रजत‍ ुंाेदनिील‍पुनरूद्धार‍और‍नालों‍के‍बफर‍के‍ुाथ-ुाथ‍ूरे-भरे‍मागों‍का‍जनमावण‍करने‍की‍कायवनीजत‍ बनाने‍के‍प्रााधान‍ददए‍गए‍ू।ैं ‍आुुे‍ईन‍क्षेत्रों‍म‍ें जल‍जनकायों‍के‍ुाथ-ुाथ‍ुंाेदनिीलता‍ुे‍बनाए‍ गए‍नए‍ुाावजजनक‍स्ट्थलों‍कज‍प्रजत्‍ुाून‍जमलेगा‍जज‍पूल‍े ईपजे क्षत‍थे। (दखे :ें‍इएनाी2;‍एमओबी3)[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 39 ii) िूरी‍जगं ल:‍ददल्ली‍म‍ें अरजक्षत‍और‍ुंरजक्षत‍ान‍क्षत्रे ों‍के‍ऄतं गवत‍बड़ा‍क्षत्रे ‍ू,,‍जज‍नागररकों‍कज‍एक‍ ुदक्रय‍जीान‍ि,ली‍और‍प्रकृजत‍ुे‍जुड़ाा‍का‍ईत्कृष्ट‍स्ट्थान‍प्रदान‍कर‍ुकते‍ू।ैं ‍ुंबंजधत‍भू-स्ट्‍ाामी‍ एजेंजुयााँ‍जाजभन्न‍प्रकार‍की‍ानस्ट्पजतयों, जीाों‍और‍प्राकृजतक‍पयावारण‍तक‍पुएचाँ ‍प्रदान‍करने‍के‍ जलए, ‘आंटरएजक्टा‍जजन’‍की‍पूचान‍और‍ईनका‍जाकाु‍करेंगी।‍आु‍यजजना‍ऄाजध‍के‍दौरान,‍ खदानों, लैंडदफल, राख‍डाआक्ु‍अदद‍ज,ुी‍ुाआटों‍कज‍पाकों‍और‍प्राकृजतक‍ूज, बटेट्ु‍के‍रूप‍में‍भी‍ पुन:‍ईपयजग‍में‍लाया‍जाएगा।‍(दखे :ें‍इएनाी‍2) iii) ुास्ट्ं कृजतक‍ूॉट‍स्ट्प‍ॉट:‍िाूजूानाबाद, ुेंरल‍जास्ट्टा‍और‍आंजडया‍गेट‍लॉन, कनॉट‍प्लेु, ूौज‍खाु, मूरौली‍अदद‍ज,ुे‍ुांस्ट्कृजतक‍ूॉट‍स्ट्‍पॉट‍ऄत्य‍ जधक‍पजब्लक‍गजतजाजध‍के‍स्ट्थान‍ू‍ैं जज‍स्ट्थानीय‍लजगों‍ कज‍अकर्नीत‍करन‍े के‍ुाथ-ुाथ‍पयवटकों‍कज‍भी‍अकर्नीत‍करते‍ू।ैं ‍गून‍ुामाजजक-ुांस्ट्कृजतक‍ गजतजाजधयों‍ााल‍े ऄन्‍य‍जाजिष्ट‍केंद्रों‍की‍पूचान‍की‍जाएगी‍(ईदाूरण‍के‍जलए‍मंडी‍ूाईु, लजधी‍ आंस्ट्टीट्डूिनल‍एररया‍और‍कला‍पररुर, ददल्ली‍ूाट, दस्ट्तकार‍ूाट, अदद)।‍ऐुे‍स्ट्थलों‍में‍और‍ईुके‍ अुपाु‍ुाावजजनक‍क्षेत्र‍कज‍बूे तर‍बनान‍ेके‍प्रयाु‍दकए‍जाएंगे। iv) राजं जट‍ूॉटस्ट्पॉट:‍दजु नया‍भर‍म‍ें प्रजतजष्ठत‍ूााइ‍ऄड्ड‍े और‍रांजजट‍स्ट्टेिन,‍िूरों‍की‍ुाावजजनक‍स्ट्मजृ त‍ और‍ुाावजजनक‍जीान‍का‍एक‍मूत्ापूणव‍जूस्ट्ुा‍ू।ैं ‍आु‍यजजना‍में‍जमजश्रत‍ईपयजग‍और‍ुाावजजनक‍ गजतजाजध‍के‍ूब‍के‍रूप‍में‍और‍ऐुे‍दिवनीय‍लडैं माकों‍के‍ुृजनाथव‍रांजजट‍नजड्ु‍के‍जाकाु‍का‍ प्रााधान‍ू।, ‍(दखे :ें‍एमओबी2‍तथा‍डीइाी4) v) बाज़ार‍स्ट्थान:‍लजग‍जािेी‍ईत्पादों‍और‍ऄनुभाों‍के‍जलए‍ददल्ली‍के‍कइ‍ऄलग-ऄलग‍बाजारों‍ुे‍जड़ु े‍ ूजते‍ू।ैं ‍आन‍बाजारों‍म‍ें जजला‍केंद्र‍और‍ुामुदाजयक‍केंद्र‍ुजूत‍बाजार‍िाजमल‍ू‍, जज‍बेूतर‍िॉलपग‍ ऄनुभा‍के‍जलए‍प,दल‍घूमन-दफरने‍ााल‍े स्ट्थ‍ ानों‍ुजूत‍ुदक्रय‍अााजाूी‍ााले‍जजल‍े बन‍ुकते‍ू।ैं ‍ (दखे :ें‍एमओबी3) vi) मनजरंजन‍ूबः‍जाजभन्न‍ूररत‍मनजरंजनात्मक‍ूब,‍प्रदिनव ी‍और‍कांुटव‍स्ट्थान,‍ुप्ताूांत‍गतं ्‍स्ट्थल,‍ थीम‍पाकव‍अदद‍का‍जाकाु‍ूररत‍जाकाु‍क्षेत्र‍(जी.डी.ए.)‍में‍प्रत्याजित‍ू,,‍जजुुे‍िूर-स्ट्तरीय‍ ुाावजजनक‍स्ट्थलों‍की‍ुूची‍में‍ाजृ द्ध‍ूजगी।‍(दखे :ें‍डीइाी2) 5.2.3 िूर‍स्ट्तरीय‍ुर्दकट:‍ुाावजजनक‍स्ट्‍थल‍नेटाकव‍एक‍ुुरजक्षत‍और‍जीांत‍ुाावजजनक‍क्षेत्र‍कज‍ुमृद्ध‍करने‍के‍ जलए‍एक‍मूत्ापूण‍व कायवनीजत‍ूजत‍े ू।ैं ‍आु‍यजजना‍म‍ें ददल्ली‍में‍ूररत‍कॉररडजर,‍धरजूर‍और‍ुां‍स्ट्‍कृजतक‍ ुर्दकट‍ऄथाा‍ऄस्ट्थायी‍ईत्‍ुा‍ुर्दकट‍बनाने‍के‍जलए‍बुएत-ुे‍ऄाुरों‍की‍पूचान‍की‍गइ‍ू।, ‍ुंभाजात‍ुर्दकट‍ की‍एक‍ुांकेजतक‍ुूची‍ऄनलु ग्नक‍6‍म‍ें दी‍गइ‍ू।, ‍पदयात्रा,‍जाश्राम‍करन‍े और‍ुामाजजक‍ुम्पकव‍की‍जन‍ ुुजाधाओं‍में‍ुुधार,‍ुांस्ट्कृजतक‍और/‍या‍रचनात्मक‍आकजनजमीज‍और‍थीम‍ााल‍े कायवक्रमों‍अदद‍कज‍ुुकर‍ बनाने‍के‍जलए‍आु‍तरू‍के‍ुर्दकट‍का‍काम‍िुरू‍दकया‍जाएगा।‍(दखे :ें‍एचुीपी2;‍एमओबी‍3) 5.2.4 नाआटलाआफ‍ुर्दकट‍(एनुी): ुुरक्षा‍में‍ुुधार,‍ऄलग-ऄलग‍गजतजाजधयों‍ुे‍जाम‍म‍ें कमी,‍जाजभन्‍न‍ गजतजाजधयों‍ के‍ जलए‍ स्ट्‍थानों‍ का‍ इष्ट‍तम‍ ईपयजग‍ करना‍ और‍ औपचाररक‍ एां‍ ऄनौपचाररक‍ अर्नथक‍ गजतजाजधयों‍के‍जलए‍ईत्पादकता‍म‍ें ुुधार‍करन‍े के‍जलए‍नाआट‍टाआम‍आकजनजमीज‍(एनटीइ)‍और‍ुदक्रय‍राजत्र‍ जीान‍मूत्‍ापूणव‍ू।ैं40 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] i) ुांस्ट्‍कृजतक‍ईपक्षेत्रों‍ज,ुे‍मागव‍या‍क्षेत्र,‍धरजूर‍ुंपजियों‍की‍बुएलता‍ााल‍े क्षेत्र, केंद्रीय‍्ापार‍जजल‍े में‍क्षेत्र‍अदद‍जज‍एक‍जीांत‍नाआटलाआफ‍ू,,‍ातवमान‍म‍ें नाआटलाआफ‍ुर्दकट‍(एनुी) के‍प्राथजमकता‍ ााले‍नजड‍ूोंगे।‍ ii) स्ट्‍थानीय‍जनकाय, पयवटन‍जाभाग‍और‍ऄन्य‍ुंबंजधत‍एजेंजुयां,‍एनुी‍की‍पूचान‍करेंगी‍और‍ूजटल, रेस्ट्तरां, ुामाजजक-ुांस्ट्कृजतक‍गजतजाजधयों, मनजरंजन, खेल‍ुुजाधाओं, खुदरा‍स्ट्टजर‍आत्यादद‍के‍जलए‍ जाजनर्ददजष्टयों‍के‍ऄनुुार‍राजत्र‍में‍कायव‍करन‍ेके‍जलए‍जास्ट्ताररत‍ुमय‍की‍ऄनुमजत‍देंगी। iii) ुंबंजधत‍एजेंजुयां, पयावप्त‍रजिनी, ुुरक्षा‍और‍ुाावजजनक‍परराून‍द्वारा‍अुान‍पुएचं ‍कज‍ुुगम‍ बनाने‍के‍जलए‍जचजननत‍एनुी‍में‍ुंयुि ‍रूप‍ुे‍काम‍करेंगी।‍रात‍के‍ुमय‍कम‍अाृजि‍के‍ुाथ‍ जािेी‍मेरज‍लाआनों‍और‍बु‍मागों‍कज‍प्रचाजलत‍करने‍की‍ऄनुमजत‍दी‍जा‍ुकती‍ू।, iv) जचजन्ूत‍एनुी‍के‍ुाथ-ुाथ‍ुभी‍नए‍जनमावण/पुनर्नाकाु‍कज‍ुदक्रय‍फ्रंटेज‍ुृजजत‍करन‍े के‍जलए‍ प्रजत्ुाजूत‍दकया‍जाएगा। v) ुंबंजधत‍एजेंजुयां, एनुी‍कज‍बढााा‍देने‍के‍जलए‍मौुमी‍या‍ुांस्ट्कृजतक‍ईत्‍ुाों,‍थीम्ड‍नाइट‍ाॉक‍ अदद‍का‍अयजजन‍करने‍के‍जलए‍कलाकारों‍के‍ुमूूों, ुांस्ट्कृजतक‍ुमूूों, जनााुी‍ुमूूों, युाा‍ ुमूूों, बाजार‍और‍जाक्रेता‍ुंघों‍और‍ुाप्ताजूक‍बाजारों‍अदद‍के‍ुाथ‍ुूयजग‍कर‍ुकती‍ू।ैं 5.2.5 ुंबंजधत‍एजेंजुयों‍द्वारा‍जाज्ञापन‍के‍मा्यम‍ुे‍ुाावजजनक‍स्ट्थल‍ुुधार‍के‍जािपजीण‍के‍नाीन‍तंत्र, ुाावजजनक‍स्ट्थलों‍कज‍ऄल्पकाजलक‍पट्टे‍पर‍देन,े ुीएुअर‍जनजध‍के‍ईपयजग अदद‍की‍ुंभाानाओं‍का‍पता‍ लगाया‍जा‍ुकता‍ू।, 5.3 स्ट्थानीय‍ुााजव जनक‍स्ट्थलों‍म‍ेंुधु ार‍करना 5.3.1 स्ट्र‍ीट‍पर‍ुााजव जनक‍जीान:‍ददल्ली‍म‍ें कुल‍भूजम‍के‍लगभग‍20‍प्रजतित‍जूस्ट्ुे‍पर‍ुड़कें‍बनी‍ू‍ैं और‍ िूर‍में‍ुाावजजनक‍स्ट्थल‍का‍ुबुे‍ुाव्ापी‍रूप‍ू।, ‍यजजना‍में‍लजगों‍के‍जलए‍आु‍क्षमता‍का‍लाभ‍ईठाने‍ और‍स्ट्‍रीट‍कज‍जन-स्ट्‍थल‍के‍रूप‍में‍पुनः‍बनाने‍पर‍फजकु‍दकया‍गया‍ू।, i) ऄनलु ग्नक‍ 7‍ में‍ स्ट्रीट‍ जडजाआन‍ जाजनयमों‍ के‍ ऄनुुार,‍ पयावप्त‍ ुड़क‍ ऄाुंरचना,‍ छाया, और‍ ुाावजजनक‍ ुुजाधाओं‍ के‍ ुाथ‍ बाधा‍ रजूत‍ ााताारण‍ प्रदान‍ कर‍ परू े‍ िूर‍ म‍ें प,दल‍ चलन‍े (ाॉकेजाजलटी)‍कज‍ुुजाधाजनक‍बनाया‍जाएगा। ii) खण्‍ड‍5.3.2‍के‍ऄनुुार‍स्ट्‍रीट‍ाेंलडग‍जजन,‍ुभी‍प्रकार‍के‍ईपयजगकतावओं‍तक‍पुएचं ,‍प,दल‍यात्री‍ क्रॉलुग‍और‍पजब्लक‍प्‍लाजा‍जु, े‍ऄाुरों‍का‍ुृजन‍कर‍ुड़कों‍पर‍ुाावजजनक‍जीान‍म‍ें और‍ऄजधक‍ ुुधार‍दकया‍जा‍ुकता‍ू।, 5.3.2 पजब्लक‍प्लाज़ा:‍प्लाज़ा‍म ें पड़जु‍के‍चौक‍और‍नुक्कड‍ुे‍लेकर‍ुंस्ट्थागत‍फजरकजटव, िूर‍के‍चौक‍(जुटी‍ स्ट्क्वायर)‍और‍जपयाज़ा‍तक‍अत‍े ू,ैं और‍य‍ेअााजाूी‍नेटाकव‍के‍ुाथ-ुाथ‍मूत्ापूणव‍ठूराा‍लबद‍ुूजते‍ू।ैं 5.3.2.1 िूर‍म‍ेंजनम्न‍प्रकार‍के‍प्लाजा‍कज‍प्रजत्ुाजूत‍दकया‍जाएगा: i) स्ट्टैंडऄलजन‍प्लाज़ा-‍ये‍आमारतों‍के‍फजरकजट्ु‍के‍रूप‍में‍ूज‍ुकते‍ूैं, और‍भूजम‍के‍स्ट्‍तर‍के‍ ुाथ-ुाथ‍ईुुे‍उंचे‍स्ट्तर‍पर‍भी‍ूज‍ुकते‍ू।ैं ii) गजलयों‍के‍दकनारे‍कॉनवर‍प्ल‍ ाजा‍आन्‍ू‍ें गजलयों‍के‍दकनारें‍पर‍बनाया‍जा‍ुकता‍ू,।‍प्‍लॉट‍के‍ छजर‍ऄथाा‍भान‍छजर‍कज‍ईभारा‍जा‍ुकता‍ू‍, ऄथाा‍पीछे‍दकया‍जा‍ुकता‍ू‍, ऄथाा‍कम‍ दकया‍जा‍ुकता‍ू‍, जजुुे‍व्‍यााुाजयक/ुांस्ट्‍थाजनक‍ईपयजग‍के‍फ,लाा‍ूते ु‍कॉनरव ‍प्ल‍ ाजा‍ त,यार‍ूज‍ुकें।‍ iii) जमड-स्ट्रीट‍प्लाज़ा-‍ये‍भूखडं ‍की‍रेखाओं‍ऄथाा‍भान‍के‍दकनारों‍कज‍ररुेु‍करके,‍जािेीकर‍ ुाावजजनक‍भानों‍के‍ुामने‍बनाये‍जा‍ुकतें‍ू।ैं[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 41 5.3.2.2 प्लाजा‍कज‍जाजभन्‍न‍प्रकार‍के‍जाकाु‍के‍जलए‍जनधावररत‍जनयमों‍के‍ऄनुुार‍ुभी‍ग्रीनफील्ड‍और‍ ब्राईनफील्ड‍लेअईट/स्ट्कीमों‍में‍लेअईट‍प्‍लान‍के‍जूस्ट्ुे‍के‍रूप‍में‍यजजनाबद्ध‍दकया‍जाएगा। 5.3.2.3 यदद‍पजब्लक‍प्‍लाजा‍के‍जाकाु‍के‍जलए‍भूखंड‍क्षेत्र‍ददया‍जाता‍ू,,‍िेी‍भूखंड‍में‍ऐु‍े क्षेत्र‍के‍जलए‍ एफएअर‍का‍ईपयजग‍करन‍े की‍ऄनुमजत‍दी‍जाएगी। 5.3.2.4 ुाावजजनक‍अााजाूी‍की‍ुुगमता‍और‍जस्ट्पलओार‍क्षेत्र‍का‍काम‍करने‍के‍जलए,‍प्‍लाजा‍कज‍भूजम‍पर,‍ कॉनकॉुव‍पर‍ऄथाा‍उंचे‍स्ट्‍तरों‍पर‍ुभी‍पारगमन‍स्ट्टेिन‍पररयजजनाओं‍के‍जूस्ट्ुे‍के‍रूप‍में‍प्रदान‍ दकया‍जाएगा। 5.3.2.5 पजब्लक‍प्लाजा‍द्वार‍रजूत‍रूगें ‍ेऔर‍अम‍जनता‍के‍जलए‍ूर‍ुमय‍खुल‍ेरूगें े। 5.3.3 गजतजाजध‍प्रजग्रालमग:‍गजतजाजध-ुृजक‍ईपयजगों‍के‍मा्यम‍ुे‍ईपयुि ‍प्रजग्रालमग,‍ुड़क‍की‍जनगरानी‍के‍ ुाथ‍जीांत‍और‍ुुरजक्षत‍ुाावजजनक‍क्षेत्र‍ुुजनजित‍करने‍म‍ें मूत्ापूणव‍भूजमका‍जनभाती‍ू।, ‍ुाावजजनक‍क्षेत्रों‍ और‍अुपाु‍के‍भानों‍के‍बीच‍मजबूत‍ुंबंधों‍कज‍जनम्नजलजखत‍ुे‍बढ़ााा‍ददया‍जाएगा: 5.3.3.1 ुरल‍जमजश्रत‍ईपयजग‍और‍ार्टटकल‍जमलक्ुग‍के‍जलए‍मानदडं ,‍ज,ुादक‍यजजना‍म‍ें प्रस्ट्ताजात‍दकए‍ गए‍ू,ैं‍ये‍भूखंडों/भानों‍के‍भीतर‍गजतजाजधयों‍के‍जमश्रण‍कज‍बढ़ााा‍देते‍ू‍ैं जजुके‍पररणामस्ट्ारूप‍ ये‍क्षेत्र‍ददन‍के‍दौरान‍लंबे‍ुमय‍तक‍ुदक्रय‍रूते‍ू।ैं ‍पस्ट्ु ‍तकालय,‍पुस्ट्तक‍भडं ार,‍ररटेल, डाकघर‍ अदद‍ज,ु‍े ुाावजजनक‍ईपयजग‍ऄजनाायव‍रूप‍ुे‍जनचल‍े तल‍पर‍रखा‍जाए‍तादक‍ुड़क‍ुे‍आन‍तक‍ ुुगमता‍ुे‍पुएचं ा‍जा‍ुके। 5.3.3.2 ुदक्रय‍फ्रंटेज:‍पनु रूद्धार‍पररयजजनाओं‍के‍भाग‍के‍रूप‍म‍ें (देख‍ें डीइाी‍3),‍18‍मीटर‍ऄथाा‍ईुुे‍ ऄजधक‍अरओडब्ल्‍‍यू‍ााली‍ुड़कों‍के‍ुाथ-ुाथ‍कुछ‍प्रजतित‍अकवड्ु, कजलजनेड्ु,‍िॉपफ्रंट्ु, प,दल‍यात्री‍प्राेि/जनकाु,‍प्लाजा, एक्ुेु‍पॉआंट्ु, पारदिी‍िॉप‍लाडज‍अदद‍के‍रूप‍म‍ें ुदक्रय‍ फ्रंटेज‍का‍कुछ‍प्रजतित‍रखा‍जाएगा।‍ग्रीनफील्ड‍क्षेत्रों‍म,ें‍ऐुे‍ुदक्रय‍फ्रंटेज‍कम‍ुे‍कम‍24‍मी.‍की‍ ुड़क‍के‍दकनारे-दकनारे‍ूोंगे।‍लागू‍मानदंडों‍के‍ऄनुुार‍आन‍दकनारों‍के‍ुाथ‍भान‍जबल्‍ट-टू-एज‍ ूोंगे।‍ईन‍स्ट्थ‍ ानों‍पर‍जूां‍चारदीाारी‍की‍ऄनुमजत‍ू,,‍ुड़क‍के‍ुाथ‍दश्ृ य‍ुंपकव‍बनाए‍रखने‍का‍ ्‍यान‍रखा‍जाना‍चाजूए‍(ऄनलु ग्नक‍7)। 5.3.3.3 एमयूजेड, ुबाे‍और‍पजब्लक/प्राआाेट‍प्लाज़ा‍कज‍दकयजस्ट्क, ऄनौपचाररक‍ाेंलडग, पजब्लक‍अट,व परफॉमेंु‍अदद‍के‍ुाथ‍जडजाआन‍दकया‍जाएगा।‍अकीवक‍प्ले‍एजलमेंट्ु, ाॉटर‍फीचुव, स्ट्रीट‍ फनीचर, चार्मजग‍पॉआंट्ु, रीलडग‍कॉनवर‍अदद‍ुे‍ुाावजजनक‍स्ट्थलों‍की‍गुणात्‍ता‍काफी‍ऄजधक‍बढ़‍ ुकती‍ू,, ‍जजुुे‍अााजाूी‍ााले‍गजलयारों‍के‍अु-पाु‍कुछ‍दरे े‍ठूरने‍के‍जलए‍स्ट्थ‍ ान‍ईपलब्‍ध‍ ूजता‍ू।, 5.3.4 स्ट्थानीय‍पाकव:‍जाजभन्न‍प्रकार‍और‍जाजभन्न‍स्ट्तरों‍की‍जरूरतों‍कज‍परू ा‍करने‍के‍जलए‍ग्रीन‍फील्ड‍तथा‍ ब्राईन‍फील्ड‍में‍पाकों,‍ूररत‍क्षेत्रों‍और‍खलु े‍स्ट्थानों‍कज‍ागीकृत‍दकया‍जाएगा।‍स्ट्कूलों‍या‍ऄन्य‍पजब्लक‍ ुंस्ट्थानों‍के‍भीतर‍मद, ानों‍का‍स्ट्कूल‍की‍ुमयााजध‍के‍बाद‍ुामुदाजयक‍पाकों‍के‍रूप‍म‍ें बुए-प्रयजग‍कज‍भी‍ प्रजत्ुाजूत‍दकया‍जा‍ुकता‍ू।, 5.3.5 जनजी‍स्ट्ााजमत्ा‍ााल‍े ुााजव जनक‍स्ट्थल‍(पीओपीएु): आु‍यजजना‍म‍ें ऐुे‍पीओपीएु‍के‍जाकाु‍कज‍ बढ़ााा‍ददया‍गया‍ू‍, जज‍जनजी‍ुंपजि‍बने‍रूगें े‍और‍जजनका‍रख-रखाा‍आुके‍स्ट्‍ाामी/डेालपर‍द्वारा‍दकया‍ जाएगा,‍लेदकन‍जूा‍ं जाजनयजमत‍ऄाजध‍के‍दौरान‍भूजमतल‍पर‍ऄथाा‍आुु‍े उंच‍े स्ट्‍तरों‍पर‍भान‍के‍भीतर‍ खुले‍स्ट्थ‍ ान‍तक‍पुएचं ‍प्रदान‍की‍जाती‍ू।,42 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] i) आन‍स्ट्थानों‍कज‍एफएअर‍ु‍े मि ु ‍माना‍जाएगा।‍डेालपु‍व कज‍ऐुे‍क्षेत्रों‍के‍अुपाु‍गजतजाजध‍ुृजक‍ ईपयजगों‍में‍लाने‍की‍ऄनुमजत‍दी‍जाएगी, लेदकन‍जनर्ददष्ट‍पजब्लक‍क्षेत्र‍के‍भीतर‍दकुी‍दकयजस्ट्क‍या‍ ्ााुाजयक‍ईपयजग‍की‍ऄनुमजत‍नूीं‍दी‍जाएगी। ii) ऐुे‍स्ट्थान‍्ााुाजयक‍ईपयजग‍के‍जलए‍डेालपुव‍द्वारा‍बनाए‍गए‍जस्ट्पल‍ओार‍स्ट्थान‍या‍जनजी‍खुल‍े स्ट्‍थानों‍के‍ऄजतररक्त‍ ‍ूोंगे।‍आुुे‍खुल‍े स्ट्थ‍ ान‍की‍अाश्‍यकताओं‍की‍प्रजतपूर्नत‍नूीं‍की‍जाएगी‍आुजलए‍ भूस्ट्‍ााजमयों/डेालपुव‍द्वारा‍आुे‍ऄजनाायव‍रूप‍ुे‍प्रदान‍करना‍ूजगा। 5.4 ुााजव जनक‍स्ट्थलों‍म‍ेंुधु ार‍के‍जलए‍ऄन्य‍ूस्ट्तक्षपे 5.4.1 ुभी‍ुाावजजनक‍स्ट्थलों‍पर‍ऄजग्न‍ुुरक्षा‍के‍प्रााधान‍ुुजनजित‍दकए‍जाएंगे‍और‍ुंबंजधत‍प्राजधकरण‍द्वारा‍ दकुी‍भी‍अपदा‍की‍जस्ट्थजत‍में‍ईपयजग‍दकए‍जाने‍ााले‍ुभी‍एकत्र‍ूजने‍ााले‍स्ट्थानों‍और‍पजब्लक‍भानों‍के‍ जनकट‍जनकाुी‍क्षेत्रों‍की‍पूचान‍की‍जाएगी। 5.4.2 पजब्लक‍अटव:‍ुाावजजनक‍स्ट्थलों‍पर‍ऄस्ट्थायी‍पजब्लक‍अट‍व ुंस्ट्‍थापनाओं‍और‍स्ट्‍रीट‍परफॉमेन्ु‍ ‍कज‍ प्रजत्ुाजूत‍दकया‍जाएगा।‍यू‍ुुजनजित‍करते‍ुएए‍दक‍ईपयजगकतावओं‍कज‍ऄुुजाधा‍नूीं‍ूज‍रूी‍ू,,‍खाली‍ पड़े‍स्ट्थ‍ ानों‍ज,ुे‍ुबाे‍क्रालुग‍और‍फ्लाइओार‍के‍नीचे‍के‍स्ट्थान‍कज‍ऐुे‍ूस्ट्तक्षेपों‍के‍मा्यम‍ईपयजग‍म‍ें लाया‍जा‍ुकता‍ू।, ‍डीयूएुी द्वारा‍त,यार‍की‍गइ‍लजक‍कला‍नीजत‍के‍ददिाजनदेिों‍का‍पालन‍दकया‍जाना‍ चाजूए। 5.4.3 नागररक‍और‍ऄन्य‍जूतधारक,‍पुएचाँ , ुुरक्षा‍और‍रजिनी, जाजिष्ट‍ईपयजगकताव‍ुमूूों‍की‍जरूरतों, अदद‍ के‍ुंबंध‍म‍ें ुाावजजनक‍क्षेत्रों‍के‍जनयजमत‍जांच‍ज,ुी‍पूलों‍और‍आन्‍ू‍ें ुंबंजधत‍एजेंजुयों‍ुे‍ुाझा‍करके‍ ुाावजजनक‍स्ट्थलों‍के‍प्रबंधन‍म‍ें एक‍प्रमुख‍भूजमका‍जनभा‍ुकते‍ू।ैं ‍ुंबंजधत‍एजेंजुया‍ं भी‍एजक्टा‍र,ाल‍और‍ ऄन्य‍स्ट्माटव‍एप्ल‍ ीकेिन्‍ु‍के‍भाग‍के‍रूप‍में‍ुाावजजनक‍क्षेत्र‍ईपयजगकताव‍ुाेक्षणों‍कज‍एकीकृत‍करके‍जनता‍ का‍ऄजभमत‍प्राप्‍त‍कर‍ुकती‍ू।ैं --- x --- x ---- x --- x ---[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 43 ऄ्याय कजड 6.0 ददल्ल‍ ी‍की‍धरजूर‍का‍प्रबधं न HCP2 6.1.1 ‘धरजूर’ में‍ऐजतूाजुक‍और‍ुबं ंजधत‍ुांस्ट्कृजतक‍मूत्‍ा‍के‍मूतव‍तत्ा‍(स्ट्मारक, भान, ुड़क, ईद्यान‍अदद)‍के‍ुाथ- ुाथ‍ऄमतू व‍तत्ा‍ ‍(ईत्‍ुा,‍पारंपररक‍जिल्प‍ईत्पाद, कला‍रूप अदद)‍अते‍ू।ैं ‍आु‍यजजना‍म‍ें एक‍ुमग्र‍दजृ ष्टकजण‍ ऄपनाया‍गया‍ू‍, और‍जनम्नजलजखत‍तरीके‍ु‍े आुम‍ें धरजूर‍ुंपजियों‍के‍ुाथ-ुाथ‍ुांस्ट्कृजतक‍केंद्रों‍म‍ें ुुधार‍की‍ पररकल्पना‍की‍गइ‍ू:, i) धरजूर‍ुंपजियों‍के‍ुरं क्षण‍और/ऄथाा‍ऄनुकूली‍पुन:‍ईपयजग। ii) ऐजतूाजुक‍क्षेत्रों‍में‍ऄाुंरचना,‍जीान‍की‍गणु ािा‍और‍अर्नथक‍जीांतता‍के‍प्रााधान। 6.2 धरजूर‍ुपं जि‍का‍ुरं क्षण 6.2.1 ुभी‍धरजूर‍ुंपजियों‍की‍ऄजा‍स्ट्थजत‍ुंबंजधत‍एजेंजुयों‍के‍पाु‍ूजती‍ू,,‍आन्‍ू‍ें जीअइएु-‍अधाररत‍ ददल्ली‍स्ट्पेरटयल‍ुूचना‍प्रणाली‍के‍ुाथ‍एकीकृत‍दकया‍जाएगा।‍ईनकी‍जस्ट्थजत‍का‍अकलन‍करने‍और‍ ुंरक्षण‍के‍जलए‍अाश्यक‍कदम‍ईठाने‍के‍जलए‍प्रत्‍येक‍5‍ाीों‍म‍ेंधरजूर‍ुंपजि‍की‍ुूची‍ऄद्यतन‍की‍जाएगी। 6.2.2 राष्ट्रीय‍और‍राज्य‍ुंरजक्षत‍स्ट्मारकों,‍भानों‍और‍जाजनयजमत‍एां‍प्रजतबंजधत‍क्षेत्रों‍के‍भीतर‍दकुी‍भी‍ जाकाु‍का‍ुंरक्षण‍और‍प्रबंधन,‍ुंबंजधत‍ऄजधजनयमों/कानूनों‍के‍ऄनुुार‍ूजगा।‍स्ट्‍थानीय‍ुमुदाय‍के‍ुाथ‍ जाचार-जामिव‍करके‍प्रत्‍येक‍क्षत्रे /स्ट्‍थल‍की‍ऄाुंरचना‍ऄद्यतन‍करन/े जाजजटर‍ुुजाधाओं‍अदद‍ुजूत‍्ापक‍ ुांस्ट्कृजतक‍ुंुाधन‍प्रबंधन‍यजजना‍बनाइ‍और‍कायावजन्ात‍की‍जाएगी। 6.2.3 प्राजधकरण‍जाराुत/ुांस्ट्कृजतक‍मूल्य‍के‍दकनी‍भानों/भानों‍के‍ुमूू‍तथा‍पुरानी‍माकेट,‍1962‍ुे‍पूा‍व की‍ुंरचनाओं,‍ऄलग-थलग‍पड़े‍पररुरों‍ज,ु‍े की‍जामा‍मजस्ट्जद‍के‍जनकटाती‍स्ट्कूल,‍प्रेजेंटेिन‍कॉन्ाेंट‍स्ट्कूल,‍ कश्मीरी‍गेट‍पर‍चचव,‍ओल्ड‍लूद‍ूकम्पल,क्ु‍अदद‍पर‍म्यूजनजुपल‍कायावलयों‍कज‍जचजन्ूत‍कर‍ुकता‍ू‍, जूां‍ मामला‍दर‍मामला‍अधार‍पर‍ुमग्र‍ुंरक्षण‍ुरं चना‍के‍ऄंदर‍परराधवन/पररातवन‍दकए‍जाएंग।े 6.2.4 आन‍धरजूर‍भानों‍के‍स्ट्‍ाामी,‍जज‍स्ट्‍थानीय‍जनकाय‍द्वारा‍ुूचीबद्ध‍दकए‍गए‍ू,ैं ‍आन‍ुंपजियों‍का‍ुंरक्षण‍ और‍ुंाेदनिील‍ईपयजग/पुन:‍ईपयजग‍ुुजनजित‍करन‍े के‍जलए‍जनम्नजलजखत‍प्रजत्ुाून‍ले‍ुकते‍ू:ैं i) भान‍के‍ग्रडे ‍के‍अधार‍पर‍आन‍भानों‍में‍फेर-बदल‍की‍ऄनुमजत‍दी‍जाएगी। ii) खण्ड‍6.2.4‍के‍ऄनुुार‍ुंरचनाओं‍के‍ऄनुकूल‍पनु :‍ईपयजग‍की‍ ऄनुमजत‍दी‍जाएगी। iii) खण्‍ड‍6.2.5‍के‍ऄनुुार,‍ऄजतररक्त‍ ‍एफएअर‍ददया‍जाएगा।‍ iv) खण्ड‍6.2.6‍के‍ऄनुुार‍स्ट्थानीय‍जनकायों‍और‍ुंबंजधत‍एजेंजुयों‍द्वारा‍ुमथवकारी‍प्रााधान। 6.2.5 ऄनकु ूली‍पनु :‍ईपयजग:‍स्ट्थानीय‍जनकायों‍द्वारा‍पूचान‍े गए‍जाराुत‍भानों‍म‍ें ु‍े ऄजधकांि‍जनजी‍ स्ट्ााजमत्ा‍ााले‍ू‍ैं और‍ऄजधभजजगयों‍द्वारा‍आनका‍ुदक्रय‍ईपयजग‍दकया‍जा‍रूा‍ू।, ‍ऐुे‍भानों‍में, ुघं टक‍ स्ट्ााजमयों‍कज‍आन‍भानों‍का‍ुंरक्षण‍करने‍और‍ऐजतूाजुक‍ुंदभव‍के‍ऄनुरूप‍ऐुी‍पररुंपजियों‍का‍ऄनुकूल‍ ईपयजग‍/‍पुन:‍ईपयजग‍करन‍े के‍जलए‍प्रजत्ुाजूत‍दकया‍जाएगा।‍जाराुत‍भानों‍म‍ें दकुी‍भी‍नए‍ुंगत‍ ईपयजग‍की‍ऄनुमजत‍दी‍जाएगी‍ज,ुादक‍स्ट्थानीय‍जनकायों‍द्वारा‍ऄजधुूजचत‍दकया‍गया‍ू‍, जजुके‍जलए‍ऄलग‍ जाजनयम‍बनाए‍जाएंगे। i) ईन‍जाराुत‍भानों‍म,ें‍जूां‍ऄनुकूली‍पुन:‍ईपयजग‍की‍यजजना‍बनाइ‍जा‍रूी‍ू,, ‍मापन‍के‍जलए यूबीबीएल‍के‍प्रााधानों‍के‍ऄजनाायव‍पालन‍पर‍जजर‍नूीं‍ददया‍जा‍ुकता‍ू‍, क्योंदक‍य‍े भान‍और‍ ुंरचनाएं‍पूले‍ूी‍बन‍चुकी‍ू।ैं44 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ii) ुाआट‍के‍भीतर,‍खुल‍े क्षेत्रों‍में‍ऄनौपचाररक‍बाजार, फूड‍कजटव, ुांस्ट्कृजतक‍कायवक्रम‍अदद‍गजतजाजधयों‍ के‍जलए‍ऄस्ट्थायी‍ुंरचनाओं‍का‍जनमावण‍स्ट्थानीय‍जनकायों‍और‍ददल्ली‍ऄजग्निमन‍ुेाा,‍जूां‍लागू‍ूज,‍ की‍ऄनुमजत‍के‍ऄ्‍यधीन‍ूजगा। 6.2.6 ूरे रटेज‍टीडीअर:‍स्ट्थानीय‍जनकायों‍द्वारा‍ऄजधुूजचत‍धरजूर‍आमारतों‍के‍माजलकों‍कज‍जाकाु‍के‍ ऄजधकारों‍के‍नुकुान‍की‍प्रजतपूर्नत‍दी‍जाएगी।‍ऄप्रयुि ‍एफएअर‍की‍गणना‍ुंबंजधत‍भूजम‍ईपयजग‍पर‍ ऄनुमत‍एफएअर‍का‍ईपयजग‍करके‍की‍जाएगी।‍स्ट्‍ाामी,‍धरजूर‍ुंपजि‍कज‍आुकी‍धरजूर‍प्रकृजत‍एा‍ं ुंरचना‍में‍ुंरजक्षत‍करने‍एा‍ंबनाए‍रखन‍े के‍जलए‍20‍ऄजतररक्त‍ ‍एफएअर‍के‍पात्र‍भी‍ूोंगे। i) टीडीअर‍(ूस्ट्तांतरणीय‍जाकाु‍ऄजधकार)‍के‍रूप‍म‍ें कुल‍एफएअर‍(ऄप्रयि ु ‍और‍प्रजत्ुाून),‍प्रदान‍ दकया‍जाएगा‍जजुका‍पूचाने‍गए‍टीडीअर‍प्राप्त‍क्षेत्रों‍में‍ईपयजग‍दकया‍जा‍ुकता‍ू।, ‍(दखे :ें‍ डीुीएन) ii) दद.जा.प्रा.‍द्वारा‍टीडीअर‍प्रमाणपत्र;‍ुंपजि‍की‍ईपयुक्‍त‍मरम्मत‍और‍ुुधार‍दकए‍जाने‍और‍ुंबंजधत‍ एजेंजुयों‍ुे‍प्राुंजगक‍प्रमाणीकरण‍प्राप्‍त‍कर‍लेने‍के‍बाद‍ूी‍जारी‍दकया‍जाएगा। iii) स्ट्थानीय‍जनकाय/ुंबंजधत‍एजेंुी,‍प्रजतबद्ध‍मरम्मत‍और‍रखरखाा‍न‍दकए‍जाने‍या‍भान‍के‍धरजूर‍ मूल्य‍कज‍क्षजत‍पुएचं ने‍के‍मामल‍ेमें‍िाजस्ट्त‍प्रभाररत‍करेगी। 6.2.7 ऄन्य‍ुमथकव ारी‍प्रााधान: i) स्ट्थानीय‍जनकाय,‍धरजूर‍प्रकजष्ठ‍‍स्ट्थाजपत‍करें‍जज‍जाराुत‍ुंपजि‍का‍प्रबंधन‍करेंगे, ईनके‍रख-रखाा‍ की‍जस्ट्थजत‍की‍जनगरानी‍करेंगे, ुांस्ट्कृजतक‍ईपक्षेत्र‍का‍जनधावरण‍करेंग,े ‍परू क‍अर्नथक/ुांस्ट्कृजतक‍ गजतजाजधयों‍कज‍बढ़ााा‍देना,‍ुमारजू‍के‍अयजजन,‍ाॉक‍अदद‍कज‍बढ़ााा‍देंग,े ऄनुकूली‍पनु :‍ईपयजग‍ पररयजजनाओं‍कज‍ुुजाधाजनक‍बनाएंगे‍और‍आन‍पूलों‍में‍मदद‍के‍जलए‍एक‍धरजूर‍जनजध‍स्ट्थाजपत‍ करेंगे।‍ ये‍ धरजूर‍ प्रकजष्ठ‍‍ ऄन्‍य‍ लडैं माकव,‍ अधुजनक‍ और‍ औद्यजजगक‍ धरजूर‍ भानों/भानों‍ के‍ जूस्ट्ु‍ ों/स्ट्‍थलों‍की‍पूचान‍कर‍ुकते‍ू।ैं ii) ुंबंजधत‍एजेंजुयां‍धरजूर‍ुंपजियों‍के‍स्ट्‍ााजमयों‍कज‍ऄपनी‍जाराुत‍ुंरचनाओं‍के‍ुंरक्षण‍में‍ुुजाधा‍ प्रदान‍करेंगी।‍प्रत्येक‍एजेंुी‍एक‍पजटवल‍जाकजुत‍करेगी‍जजुमें‍धरजूर‍ुंरचनाओं‍की‍ुूची, धरजूर‍ भानों‍म‍ें जािेीज्ञता‍ााल‍े पन, लबद्ध‍तकनीकी‍जािेीज्ञों, कलाकारों, कायवकारी‍एजेंजुयों‍की‍ुूची,‍ चलाइ‍जा‍रूी‍पररयजजनाओं,‍पूचाने‍गए ुंभाजात‍जनाेिकों‍अदद‍ुे‍ुंबंजधत‍ुूचना‍दी‍गइ‍ूज। iii) ुंबंजधत‍एजेंजुयां‍जिक्षा‍और‍ुंाेदीकरण‍के‍जलए‍कायवक्रमों‍कज‍कायावजन्ात‍भी‍करेंगी‍और‍स्ट्थानीय‍ जनकायों/‍ुंबंजधत‍एजेंुी‍द्वारा‍दकए‍जाने‍ााले‍ूरे रटेज‍ाॉक‍जु, ी‍पूलों‍का‍ुमथनव ‍करेंगी। iv) धरजूर‍ुंपजियों‍कज‍ऄपनान‍े /‍ईनके‍ुंरक्षण‍और‍प्रबंधन‍के‍जलए‍ुीएुअर‍जनजधयन‍कज‍बढ़ााा‍ ददया‍जाए। 6.3 िूर‍म‍ेंधरजूर‍और‍ुास्ट्ं कृजतक‍ुमूू 6.3.1 िूर‍म‍ेंतीन‍प्रकार‍की‍धरजूर‍/‍ुांस्ट्कृजतक‍ुमूूों‍की‍पूचान‍की‍जाती‍ू,, i) धरजूर‍क्षत्रे ः‍धरजूर‍क्षेत्र‍ाू‍क्षेत्र‍ू,, जजुमें‍यजजना‍द्वारा‍ऐजतूाजुक‍या‍ुौंदयवपरक‍रूप‍ु‍े या‍ भौजतक‍जाकाु‍अदद‍ु‍े जुडे‍भानों,‍ुंरचनाओं,‍ुमूूों‍या‍कॉम्‍पल,क्ु‍ ों‍की‍मूत्ापूण‍व बुएलता,‍ ललकेज‍ऄथाा‍जनरंतरता‍ू।, ‍जनम्नजलजखत‍क्षेत्रों‍की‍धरजूर‍क्षेत्र‍के‍रूप‍म‍ेंपूचान‍की‍गइ‍ू:, क) िाूजूानाबाद‍चारदीाारी‍िूर‍ ख) लुरटयन‍बगं ला‍क्षेत्र‍(एलबीजेड)[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 45 यथा‍ुूचीबद्ध‍ऄनलु ग्नक‍8,‍धरजूर‍का‍भाग‍ूजना‍चाजूए ii) ुास्ट्ं कृजतक‍ईपक्षत्रे :‍ुांस्ट्कृजतक‍ईपक्षेत्र,‍एक‍पररभाजीत‍क्षत्रे ‍में‍एक‍दुू रे‍ु‍े मागों‍द्वारा‍ऄथाा‍ अुंजक‍जनर्नमत‍रूप‍में‍जडु ी‍ाास्ट्तुजिल्प, ऐजतूाजुक, ुांस्ट्कृजतक‍और‍ुूबद्ध‍मल्ू यों‍ााली‍मूतव‍और‍ ऄमूतव‍दजनों‍तरू‍की‍ऄलग-ऄलग‍जाराुत‍की‍बुएलता‍कज‍दिावता‍ू।, ‍ये‍ईपक्षेत्र‍धरजूर‍जजन‍ु‍े ऄलग-ऄलग‍भी‍ूज‍ुकते‍ू‍ैंऄथाा‍धरजूर‍जजन‍का‍जूस्ट्ु‍ ा‍भी‍ूज‍ुकते‍ू।ैं ‍ऄनुलग्न‍ क‍8,‍ुांस्ट्कृजतक‍ ईपक्षेत्रों‍‍की‍ुांकेजतक‍ुूची‍ू।, iii) परु ातत्ा‍पाकव:‍परु ातत्ा‍ ‍पाकव,‍धरजूर‍ुंुाधनों‍और‍ऐुे‍ुंुाधन‍ुे‍युक्‍त‍भूजम‍ााला‍क्षेत्र‍ूजता‍ू,,‍ जजुमें‍पयवटकों‍के‍जलए‍अकीवण‍के‍तौर‍पर‍मूत्‍ापूण‍व ूजने‍के‍ऄजतररक्त‍ ,‍जनता‍के‍जलए‍एक‍ ्ाख्यात्मक‍और‍ि,जक्षक‍ुंुाधन‍बनन‍े की‍क्षमता‍ूजती‍ू।, ‍पुराताजत्ाक‍पाकों‍कज‍रूप,‍जडजाआन, ुामग्री‍और‍पदाथ,व ईपयजग‍और‍प्रकायव,‍परंपरा‍और‍अकीणव ‍के‍तकनीक, ऄाजस्ट्थजत‍और‍परराेि,‍ भाा‍और‍ऄनुभा‍और‍ऄन्य‍अतं ररक‍एा‍ं बाह्य‍कारकों‍ज,ु‍े ऄजनाायव‍पूलओंु ‍के‍मूल्यांकन‍के‍अधार‍ पर‍पररभाजीत‍दकया‍जाएगा।‍ददल्ली‍में‍जन‍र्ददष्ट‍‍पुरातत्ा‍ ‍पाकव‍ू:ैं क) मूरौली‍परु ातत्ा‍पाकव ख) तुगलकाबाद‍पुरातत्ा‍पाकव ग) ुुल्तान‍गढ़ी‍परु ातत्ा‍पाकव घ) आंद्रप्रस्ट्थ‍परु ातत्ा‍पाकव‍ ङ) ईिरी‍ररज‍परु ातत्ा‍पाकव ईपरजि ‍ुूची‍ुांकेजतक‍ू‍, और‍ुंबंजधत‍एजेंजुयों‍द्वारा‍और‍ऄजधक‍धरजूर‍जजन, ुांस्ट्कृजतक‍ईपक्षेत्रों,‍पुरातत्ा‍ पाकों‍कज‍जजड़ा‍जा‍ुकता‍ू।, 6.4 धरजूर‍क्षत्रे ों‍और‍ुास्ट्ं कृजतक‍ईपक्षत्रे ों‍के‍जलए‍कायनव ीजतया ाँ 6.4.1 िाूजूानं ाबाद‍एक‍ुास्ट्ं कृजतक‍ईद्यम‍केंद्र‍के‍रूप‍म:ें ‍चारदीाारी‍िूर,‍िूर‍का‍ऐजतूाजुक‍रूप‍ुे‍मूल‍ और‍्ापाररक‍केंद्र‍ू,, जज‍मूतव‍और‍ऄमूत,व‍दजनों‍धरजूरों‍ु‍े ुमृद्ध‍ू।, ‍यूां‍बुएत-ुी‍ऄजधुूजचत‍धरजूर‍ ुंपजियों‍के‍ऄजतररक्त‍ ,‍जाि‍धरजूर‍स्ट्थल‍लाल‍दकला‍जस्ट्थत‍ू।, ‍आुकी‍ऄनूठी‍ुंरचना‍में‍कटरा, बाज़ार, ऐजतूाजुक‍बाज़ार, ुड़कें‍और‍जास्ट्‍टा‍के‍ुाथ-ुाथ‍त्यौूार, कजाता, पारंपररक‍जिल्प‍ईत्पाद, भजजन‍और‍ास्त्र‍आत्यादद‍ज,ुे‍ऄमूतव‍ुांस्ट्कृजतक‍ऄनुभा‍िाजमल‍ू,ैं जज‍ददल्ली‍की‍जािेीता‍ू।ैं ‍ूालांदक, आु‍क्षेत्र‍में‍कइ‍चुनौजतयां‍भी‍ू‍ैं ज,ुेदक‍जनरंतर‍थजक‍व्‍यापार, भंडारण‍और‍प्रदीू ण/खतरनाक‍अर्नथक‍ गजतजाजधयां, और‍ माल‍ की‍ अााजाूी‍ के‍ कारण‍ यातायात‍ जाम, भानों‍ का‍ जीणव-िीणव‍ ूजना,‍ ऄाुंरचना‍का‍ऄभाा‍और‍तदथ‍व एां‍ग,र‍ुंाेदनिील‍रूपांतरण‍जजुु‍े जनर्नमत‍ुंरचना‍जारूजपत‍ूजती‍ ू।, ‍यजजना‍ऄाजध‍के‍दौरान‍क्षत्रे ‍के‍पुनरुद्धार‍के‍जलए‍एक‍बुए-एजेंुी‍ुमजन्ात‍पूल‍िरूु ‍की‍जाएगी: क) 2‍ाीों‍के‍ऄंदर‍चारदीाारी‍िूर‍के‍भीतर‍ुभी‍ुांस्ट्कृजतक‍ईपक्षेत्रों‍की‍रूपरेखा‍बना‍ली‍जाएगी।‍ एुअरडीुी/ुंबंजधत‍स्ट्थानीय‍जनकाय‍खंड‍6.4.3‍के‍ऄनुुार,‍ऐुे‍ुभी‍ईपक्षेत्रों‍के‍जलए‍यजजनाएं‍ त,यार‍और‍कायावजन्ात‍करेगा।‍खण्‍ड‍6.2.3-6.2.6‍के‍ऄनुुार,‍धरजूर‍भानों‍के‍माजलकों‍कज‍ुंरक्षण/‍ ऄनुकूली‍पुन:‍ईपयजग‍के‍जलए‍ुूायता‍प्रदान‍की‍जा‍ुकती‍ू।, ख) स्ट्थानीय जनकाय ुभी प्रमुख बाजारों, ्ााुाजयक और जमजश्रत ईपयजग ााली ुड़कों की पूचान करत े ुएए क्षेत्रों के जलए एक यजजना त,यार करेगा। माल लान-े ल े जाने की ुभी ूाजनकारक ईद्यजगों‍ और‍जजजखमपूण‍व ्ापारों, गजदामों और थजक गजतजाजध कज 10 ाीव की ऄाजध म ें आु क्षत्रे ु े ूटा ददया जाएगा और िूर म ें जनर्ददष्ट क्षेत्रों म ें स्ट्थानांतररत कर ददया जाएगा।‍लाजपत‍राय‍माकेट‍ज,ुी‍46 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] पुरानी‍माकेट‍कज‍पूावाती‍यजजनाओं‍म‍ें यथा‍जनधावररत‍के‍ऄनुु ार‍रखा‍जाएगा। मौजूदा गजतजाजधयजाँ‍ कज खुदरा रूप म ें जारी रखा जा ुकता ू।, पुरान े िूर ुे जुड़ी और स्ट्थानीय जनकाय द्वारा पूचानी गइ ऄंतुंबद्ध खुदरा गजतजाजध के ुमूून और ुंकुलन कज बढ़ााा ददया जाएगा। ग) आु क्षत्रे कज कलाकार स्ट्टूजडयज, प्रदिवन स्ट्थान, ुंग्रूालय, पुस्ट्तकालय, क,फे, ुंगीत स्ट्थल, ुू-काय व स्ट्थान, जिल्प केंद्र, ूजटल ज,ुे ईपयजग ुांस्ट्कृजतक ईद्यम केंद्र के रूप में जाकजुत करन े कज प्रजत्ुाजूत करन े के जलए प्‍लॉटज म ें बी एंड बी ुुजाधाओं की ऄनुमजत दी जाएगी और न्यूनतम 6 मीटर ुड़क ुे आुकी पुएचं दी जाएगी, चाू े भूजम का ईपयजग कुछ भी क्यों न ूज। (दखे :ें‍डीइाी3) घ) िाूजूानाबाद का फाआन‍ग्रेन‍फ,बररक‍और‍स्ट्रीट‍मजरफजलजजी आुकी प्रकृजत के जलए मूत्ापूणव ू , और आु े बरकरार रखा जाएगा। आुजलए, ुमूू अााु टाआपजलजजी‍और जस्ट्टल्ट पार्ककग की ऄनुमजत नूीं दी जाएगी। ूालांदक, एकीकृत क्षत्रे म ें ुुधार और ईत्थान के प्रयजजनाथव बड़े क्षेत्रों के पुनगवठन (ज,ुेदक ुब-जजन ुत् र) की ऄनुमजत दी जाएगी। चारदीाारी िूर के ऄंदर ुभी पुनरुद्धार, ददए गए जाजिष्ट जाकाु और िूरी जडजाआन जनयंत्रण के ऄनुुार ूोंग।े ‍(दखे :ें‍डीुीएन) ङ) चारदीाारी ााला िूर, िूर म ेंनाआट लाआफ ुर्दकट के जलए एक केन्द्र ू।, (दखे :ें‍एचुीपी1) च) स्ट्थानीय जनकाय और‍ऄन्य ुंबंजधत एजेंजुयां, जनम्नजलजखत क्षत्रे ुुधार पूलों म ें ुूायता करेंग‍े /‍आन्ू ें कायावजन्ात करेंगे। i) चारदीाारी िूर के जलए‍ााूनों की अााजाूी के मागों, पदयात्रा क्षेत्रों और ुड़कों, एनएमटी मागों, ुर्नाु ााूनों की ुीमा और ुमय-ुारणी, जनााजुयों और पयवटकों के जलए ुाझा पार्ककग क्षेत्रों की पूचान कर एक यातायात प्रबंधन यजजना और मेरज‍स्ट्टेिनों के अुपाु यात्री अााजाूी यजजनाएं लाग ू की जाएगी, जज चारदीाारी िूर के जलए कारगर ूों। ii) क्षत्रे म ें ुदक्रय यात्रा कज बढ़ााा ददया जाएगा और यू प,दल चलन,े ुाआदकल चलान,े पीबीएु अदद की ुुजाधाएं प्रदान के जलए यू एक ऄजधमानत: एटीडी ूजगी। (दखे :ें‍ एमओबी3) iii) एमएलुीपी के जनमावण के जलए चारदीाारी‍िूर म ें और ऄजधक खुल े स्ट्थान नूीं जलए जाएंग े क्योंदक आु क्षत्रे म ें बुएत-ुारे मेरज स्ट्टेिन क्षत्रे अु-पाु जस्ट्थत ू।ैं दकुी भी मौजूदा ुतूी ुाावजजनक पार्ककग स्ट्‍थल कज पूावात बरकरार रखा जाएगा। ुभी ुांजाजधक‍स्ट्ाीकृजतयां ली जाएंगी। iv) जनााजुयों‍और‍जूतधारकों‍के‍परामि‍व ु‍े अपात‍जस्ट्थजत‍के‍दौरान‍जनकाुी‍के‍जलए‍आस्ट्तेमाल‍ दकए‍जाने‍के‍ुाथ‍ूी‍ुामाजजक-ुांस्ट्कृजतक‍ुुजाधाओं‍और‍ुेााओं‍एा‍ं ुुजाधाओं‍और‍ ईपयजजगताओं‍की‍ुंस्ट्थापना‍या‍ुुधार‍की‍अाश्यकता‍अधाररत‍्ास्ट्था‍के‍जलए‍ईपयजग‍ दकए‍जाने‍के‍जलए‍कटरा, बाज़ारों‍अदद‍के‍जलए‍क्षत्रे ‍स्ट्तरीय‍यजजना‍त,यार‍की‍जाएगी। v) अग के जजजखम कज बढ़ाने ााल े ओारूडे तारों के ढेर कज ईजचत तकनीकी ुमाधानों के मा्यम ुे ठीक दकया जाएगा (दखे :ें अइएनएफ4)। 6.4.2 लरु टयन बगं ला क्षत्रे : आु क्षत्रे म ें राष्ट्रपजत भान, ुंुद भान, आंजडया गटे , ुुप्रीम कजट,व ददल्ली ईच्च न्यायालय, नॉथव और ुाईथ ब्लॉक, क,जबनेट ुजचाालय, प्रधानमंत्री कायावलय, जाजभन्न केंद्रीय मंत्रालयों के कायावलय, ुंग्रूालय, कला दीघावओं और बंगलों, जज ुरकारी जनााु का काम करत े ू,ैं‍ुजूत‍केंद्र‍ ुरकार‍के‍स्ट्थल‍िाजमल‍ू।ैं ‍एलबीज,ड‍की‍ऄपनी‍एक‍ऄनूठी‍जाजिष्टता‍ू‍, जजुमें‍बड़े‍ाृक्षों‍ााले‍एाेन्यू,‍ ुेंरल‍जास्ट्टा,‍गजलचक्कर,‍बड़े‍जनजी‍और‍ुाावजजनक‍ईद्यान‍और‍कॉलजजनयल‍ाास्ट्तुकला‍के‍मूत्ापूण‍व ईदाूरण‍ू।ैं i) लुरटयन बंगला क्षत्रे के पुनरूद्धार के जलए, ुंबंजधत एजेंुी द्वारा आुकी धरजूर मूिा और ुौंदय व प्रकृजत ुे ुमझौता दकए जबना, जाकाु-ईन्मुखी मानदंड त,यार दकए जाएंगे।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 47 6.4.3 ुास्ट्ं कृजतक‍ईपक्षत्रे ों के जलए प्रााधान: जनम्नजलजखत प्रााधान लाग ू ूोंग:े i) स्ट्थानीय जनकाय द्वारा‍ुूचीबद्ध ुांस्ट्कृजतक ईपक्षेत्रों की ुीमाओं की रूपरेखा (आु प्रयजजनाथ व बनाए गए जुद्धांतों के अधार पर) बनाइ जाएगी और क्षेत्रीय यजजनाओं म ेंजनरूपण दकया जाएगा ii) स्ट्थानीय जनकाय / ुंबंजधत एजेंुी द्वारा िूरी जडज़ाआन और जबल्ट फॉमव जनयंत्रण िाजमल करते ुएए‍ प्रत्येक‍ईपक्षेत्र‍ूते ु ुांस्ट्कृजतक ुंुाधन प्रबंधन यजजना (ुीअरएमपी) त,यार की जाएगी। जूां भी ुंभा ूज, ईपक्षेत्र म ें भू-स्ट्तर पर मख्ु य ुड़कों के ुाथ-ुाथ ुदक्रय फ्रंटेज कज प्रजत्ुाजूत दकया जाएगा। ईपक्षेत्रों के ऄंदर ुामाजजक-ुांस्ट्कृजतक गजतजाजधयों कज बढ़ााा ददया जाएगा। iii) आन क्षेत्रों के मागव और ुड़क नटे ाकव कज जज‍ईपक्षेत्र‍का‍एक‍भाग‍ू,ैं‍पीबीएु और एनएमाी ज,ुी ुुजाधाओं म ेंुुधार और आनके जाकाु के जलए ाररयता‍प्राप्त एटीडी माना जाएगा। iv) जाजभन्न धरजूरों ुंपजियों‍या ईपक्षेत्रों कज जजडने‍ााल े प्राकृजतक नालों‍के‍ुाथ‍ूररत‍कजररडजर कज पयवटकों के जलए पयावप्त ुुजाधाओं के ुाथ आकज-ुांस्ट्कृजतक कॉररडजर के रूप म ें जाकजुत दकया जाएगा। v) ईपक्षेत्रों म ें धरजूर मागों/ाॉक कज प्रजत्ुाजूत दकया जाएगा। जीांतता बढ़ाने के जलए आन मागों कज नाआट‍लाआफ ुर्दकट एा ंुांस्ट्कृजतक ुमारजू के ुाथ एकीकृत दकया जाए।‍(दखे :ें‍एचुीपी1) 6.4.4 परु ाताजत्ाक पाकों के जलए प्रााधान: प्राकृजतक धरजूरों के बीच जनर्नमत धरजूरों के ुंरक्षण पर जजर देते ुएए ुीअरएमपी त,यार दकया जाएगा। यजजना म ें ुभी ुंभाजात ुंुाधनों ज,ुे ऐजतूाजुक ुंरचनाओं, ईद्यानों, बागों, खुल े जलाियों, ुीढीयि ु कुओं, बााजलयों अदद की पूचान की जाएगी और आु स्ट्थल के ुंाेदनिील जाकाु के जलए ऄपेजक्षत जाजिष्ट िूरी जडजाआन जनयंत्रण ईपलब्ध कराए जाएंगे। i) पुरातत्ा पाकों म ें जनजष्क्रय ऄाकाि गजतजाजधयों ााले पयवटक केंद्र बनने की क्षमता ू।, आन स्ट्थलों का प्राकृजतक ऐजतूाजुक परराेि कज ुंाेदनिील भूदश्ृ य जडजाआन द्वारा ुंरजक्षत दकया जाएगा ii) रेस्ट्तरां / क,फे, पुस्ट्तकालय, दकयजस्ट्क, ्ाख्या/ प्रदिवनी / प्रजिक्षण केंद्रों, पयवटक ुूचना केंद्रों, स्ट्माररका भंडार और ुाावजजनक ुुजाधाओं की मानदंडों के ऄनुुार ऄनुमजत दी जाएगी। iii) ुीअरएमपी‍म‍ें पूचान‍की‍गइ‍ुंरचनाओं‍का‍ऄनुकूली‍पुन:‍ईपयजग‍्ाूायवता‍के‍ऄनुुार‍दकया‍ जा‍ुकता‍ू।, iv) ुमारजू, कायवक्रमों, कृीक बाजारों, प्रदिवजनयों अदद के अयजजनाथ व ुीजमत ऄाजध के जलए पयावारण के ऄनुकूल ुामग्री ु े जनर्नमत ऄस्ट्थायी ुंरचनाओं (स्ट्ाीकृजत की ित व पर) की ऄनुमजत दी जा ुकती ू।, ऄस्ट्थायी पजब्लक अट वऔर ुस्ट्ं थापनाओं कज भी प्रजत्ुाजूत दकया जाएगा। --- x --- x ---- x --- x --- खडं ‍4 अश्रय‍ और‍ ुामाजजक‍ऄाुरं चना पष्ठृ भजू म‍और‍प्रमखु ‍नीजतगत‍ुरजकार अााु:48 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ददल्ली‍म‍ें भूजम‍और‍अााु‍के‍जाकाु‍पर‍पयावप्त‍ुीमा‍तक‍ुीजमत‍जनजी‍भागीदारी‍के‍ुाथ‍ुाावजजनक‍क्षेत्र‍का‍ जािेीाजधकार‍रूा‍ू।, ‍ऐुी‍प्रदक्रयाओं‍ने‍अााु‍की‍बढ़ती‍मांग‍के‍ुाथ‍तालमले ‍बनाकर‍नूीं‍रखा।‍िूर‍में‍भूजम‍की‍ईच्च‍ लागत‍के‍कारण‍अााु‍भी‍पुएचाँ ‍ुे‍बाूर‍ूज‍गए‍ू‍ैं l‍ददल्ली‍के‍ुामाजजक-अर्नथक‍ुाेक्षण, जीएनुीटीडी, 2018-19‍के‍ ऄनुुार, 85%‍अबादी‍कज‍ुस्ट्ते‍अााु‍जाकल्पों‍की‍अाश्यकता‍ू।, ‍आुके‍पररणामस्ट्ारूप,‍ऐुी‍अााुीय‍अाश्यकताओं‍ कज‍ुमायजजजत‍करने‍के‍जलए‍ऄनजधकृत‍कॉलजजनयों‍(यूुी)‍और‍मजलन‍बजस्ट्तयों‍का‍प्रुार‍ुएअ‍ू‍, और‍ातवमान‍के‍िूरी‍ गााँा‍ुघन‍ूज‍गए‍ू।ैं ‍2011‍की‍जनगणना‍के‍ऄनुुार, िूरी‍जनुाँख्या‍का‍लगभग‍10.8%‍िूर‍के‍कुल‍क्षेत्र‍के‍0.5%‍ पर‍कब्ज़ा‍करके‍बनायी‍गयी‍झुजग्गयों‍म‍ें रूती‍थी।‍ऐुे‍क्षेत्र‍जनर्नमत‍अााु‍की‍खराब‍गणु ािा, ऄपयावप्त‍ुेााओं, ुुख- ुुजाधाओं‍और‍खलु े‍स्ट्थानों‍की‍कमी‍और‍यूां‍तक‍दक‍अग, भूकंप‍और‍ऄन्य‍अपदाओं‍की‍जस्ट्थजत‍में‍ईच्च‍जजजखम‍ईठाकर‍ अपदा‍की‍गंभीरता‍कज‍कम‍करने‍के‍जलए‍ुगु म्य‍माग‍वकी‍कमी‍ुे‍ग्रजुत‍रूते‍ू।ैं आन‍क्षेत्रों‍म‍ें ुुधार‍करन‍े के‍जलए‍ुरकार‍ने‍राष्ट्रीय‍राजधानी‍क्षेत्र‍ददल्ली‍(ऄनजधकृत‍कॉलजजनयों‍में‍जनााजुयों‍के‍ुंपजि‍ ऄजधकारों‍की‍मान्यता)‍ऄजधजनयम, 2019‍के‍मा्यम‍ु‍ेमान्यताप्राप्त‍यूुी‍के‍जनााजुयों‍कज‍भूजम‍ऄजधकार‍प्रदान‍करने‍की‍ प्रदक्रया‍अरम्भ‍कर‍दी‍ू।, ‍आु‍िूर‍के‍कुछ‍क्षेत्रों‍की‍अबादी‍कज‍पूरा‍करन‍े के‍जलए‍ुमुजचत‍ऄाुंरचना‍के‍प्रााधान‍के‍ जबना‍जाकजुत‍दकया‍गया‍ू।, ातवमान‍दजृष्टकजण‍जीान‍की‍ुमग्र‍गणु ािा‍में‍ुधु ार‍लान‍े के‍ुाथ-ुाथ,‍अााुीय‍स्ट्‍टॉक‍पर‍ ्यान‍केंदद्रत‍करता‍ू।, ‍मजलन‍बजस्ट्तयों‍के‍ुुधार‍के‍जलए, मूल‍स्ट्थान‍पर‍झुग्गी‍पुनाावु‍यजजनाओं‍कज‍लागू‍दकया‍जाएगा, जजुुे‍जनष्काुन‍का‍डर‍कम‍ूज‍जाएगा। ुंरचनात्मक‍गुणािा‍के‍ुाथ‍ुमझौता‍करने‍के‍ऄजतररि , अााुीय‍स्ट्‍टॉक‍भी‍ भीड़भाड़‍ााला‍ूजता‍ू,, जजुमें‍60% ुे‍ऄजधक‍परराारों‍(5‍ुदस्ट्यों‍का‍परराार)‍के‍पाु‍एक‍या‍दज‍कमरों‍की‍अााुीय‍ आकाआया‍ं ूजती‍ू‍, l‍यू‍परराार‍के‍ुदस्ट्यों‍की‍ईत्पादकता, ुमग्र‍कल्याण‍और‍ुामाजजक‍ुंबंधों‍कज‍प्रभाजात‍करता‍ू।, ‍ अााुीय‍मांगों‍के‍अकलनों‍में‍आुका‍्यान‍रखा‍गया‍ू।, लगभग‍28.4%‍परराार‍दकराये‍के‍अााु‍में‍रूते‍ू‍ैं (जनगणना, 2011) और‍ऄनुमान‍ू‍, दक‍यू‍ुंख्या‍जपछल‍े दिक‍म‍ें बढ़‍गयी‍ूजगी।‍32.3%‍जनुख्ाँ या‍प्रााुी‍ू‍, (ददल्ली‍का‍ुामाजजक-अर्नथक‍ुाेक्षण, जीएनुीटीडी, 2018-19)‍और‍ा‍े अन-े जाने‍की‍कम‍लागत‍के‍कारण‍दकराये‍के‍अााु‍कज‍प्राथजमकता‍देत‍े ू।ैं ‍आु‍दकराय‍े की‍अााु‍के‍ऄजधकांि‍मांग‍कज‍ ऄजनयजजजत‍बजस्ट्तयों‍द्वारा‍पूरा‍दकया‍जा‍रूा‍ू,, जजुमें‍स्ट्ााजमत्ा‍की‍ऄुुरक्षा‍और‍रूने‍की‍जस्ट्थजतयों‍के‍ुाथ‍ुमझौता‍ करने‍‍के‍मुद्दे‍ुजम्मजलत‍ू।ैं ‍ुस्ट्त‍े अााु, दकराये‍के‍अााु, छात्राााुों, स्ट्टूजडयज‍ऄपाटवमेंटों, ुर्नास्ट्ड‍ऄपाटवमेंटों, डॉरमेटरीज, अदद‍के‍मा्यम‍ुे‍छात्रों, एकल‍कामकाजी‍पुरुीों‍और‍मजूलाओं, प्रााजुयों‍अदद‍की‍अााु‍अाश्यकताओं‍ का‍ुमाधान‍दकये‍जाने‍की‍अाश्यकता‍ू।, रा.रा.क्षे.‍ददल्ली‍के‍पाु‍अााुीय‍स्ट्‍टॉक‍(ुाावजजनक‍और‍जनजी‍दजनों)‍का‍एक‍बड़ा‍भाग‍ू,, जजु‍पर‍दकुी‍का‍कब्ज़ा‍ नूीं‍ू‍,और/या‍जबका‍ुएअ‍नूीं‍ू।, ‍ददल्ली‍में‍11%‍घर‍(जनााु‍और‍जनााु‍के‍ुाथ‍ऄन्य‍ईपयजगों‍के‍रूप‍में‍प्रयि ु ‍मकानों‍ ुजूत)‍ररि ‍ू‍ैं(जनगणना,‍2011)।‍दकराये‍के‍जाकल्पों‍के‍मा्यम‍ुे‍ऐुे‍स्ट्टॉक‍कज‍ईपयजग‍दकये‍जाने‍की‍क्षमता‍ू।, रा.रा.क्षे.‍ददल्ली‍के‍ुाथ‍ऄच्छी‍तरू‍ु‍े जड़ु ा‍ुएअ‍ू‍,और‍अााु‍के‍क्षेत्रीय‍जाकाु‍कायों;‍जािेीकर‍ुस्ट्त‍ेअााुीय‍ाग‍व म‍ें ददल्ली‍की‍अश्रय‍अाश्यकताओं‍की‍पूर्नत‍करना‍जारी‍रखा‍जाएगा, जूााँ‍भूजम‍की‍लागत‍में‍ऄतं र‍ददए‍गए‍।‍आु‍ऄंतर- जनभवरता‍कज‍ददल्ली‍में‍अााुीय‍जाकाु‍कायव‍के‍जलए‍स्ट्ााजमत्ा‍के‍जाकल्पों‍और‍प्रारूप‍ागीकरण‍कज‍जनधावररत‍करन‍े के‍ जलए‍रणनीजतयों‍म‍ेंजनजूत‍दकये‍जाने‍की‍अाश्यकता‍ू।,[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 49 2011 की‍जनगणना‍के‍अंकड़ों‍के‍अधार‍पर, ददल्ली‍(2011-2041) की‍अााुीय‍मांग‍का‍ऄनुमान‍34.5 लाख‍ अााुीय‍आकाआयों‍का‍ू,, जजुमें‍एक‍औुत‍परराार‍का‍अकार‍4.5 ्जि यों‍का‍माना‍गया‍ू।, ‍अााुीय‍ब,कलॉग, जनुाँख्या‍में‍ाृजद्ध, बेघर‍जनुख्ाँ या‍,‍ातवमान‍अााुीय‍आकाआयों‍में‍भीड़भाड़‍के‍स्ट्तर‍के‍कारण‍ईत्पन्न‍अााु‍की‍मांग, ातवमान‍स्ट्टॉक‍(ऄप्रचलन)‍की‍जस्ट्थजत‍कज‍्यान‍म‍ें रखते‍ुएए‍अााुीय‍मांग‍की‍गणना‍की‍गइ‍ू‍, जजुके‍जलए‍िूर‍म‍ें ररि ‍ अााुीय‍स्ट्टॉक‍की‍ऄदलाबदली‍और‍ईपलब्धता‍की‍अाश्यकता‍ूजगी।‍आु‍पर‍्यान‍ददया‍जाना‍चाजूए‍दक‍अाँकड़ों‍की‍ कमी‍के‍कारण‍2011 के‍बाद‍दकुी‍भी‍अााुीय‍स्ट्टॉक‍म‍ें दकुी‍प्रकार‍के‍बदलाा‍की‍गणना‍नूीं‍की‍गयी‍ू।, ‍आुजलए,‍ जनगणना‍2021 के‍मा्यम‍ुे‍ईपलब्ध‍अंकड़ों‍कज‍्यान‍म‍ें रखते‍ुएए‍ऄनुमानों‍की‍पनु गणव ना‍बाद‍के‍यजजना‍ुमीक्षाओं‍के‍ दौरान‍करनी‍ूजगी। ुामाजजक‍ऄाुरं चना: ददल्ली‍की‍एक‍ुुदढ़ृ ‍ऄाुंरचना‍ू‍, जज‍ऄपन‍े जनााजुयों‍के‍स्ट्ाास्ट््य,‍जिक्षा‍और‍ुुरक्षा‍और‍ुामाजजक‍ुांस्ट्कृजतक‍जरुरतों‍ कज‍पूरा‍करती‍ू‍, और‍आु‍क्षेत्र‍के‍जजला/जजनल‍दजनों‍स्ट्तरों‍पर‍/‍ईप‍जजनल‍स्ट्तरों‍और‍नेबरुएड‍स्ट्तर‍पर‍ुुजाधाएं‍प्रदान‍ करती‍ू।, आु‍खंड‍के‍जनम्नजलजखत‍ऄ्यायों‍में‍अााु‍और‍ुामाजजक‍ऄाुंरचनाओं‍के‍प्रााधान‍में‍ुुधार‍करन‍े के‍जलए‍कायवनीजतया‍ं जनधावररत‍की‍गइ‍ू।ैं SSI1:‍अश्रय‍के‍जलए‍कायवनीजत‍बनाना SSI2:‍ुामाजजक‍ऄाुंरचना‍का‍प्रााधान ऄ्याय कजड SSI1 7.0 अश्रय‍के‍जलए‍कायनव ीजत‍बनाना‍ 7.1.1 यू‍यजजना,‍यजजना‍की‍ऄाजध‍म‍ें ऄनुमाजनत‍अााु‍अाश्यकताओं‍कज‍परू ा‍करन‍े के‍जलए‍एक‍्ापक‍रूपरेखा‍ प्रदान‍करती‍ू।, ‍यू‍ातवमान‍क्षेत्रों‍के‍ईत्थान‍और‍ग्रीनफील्ड‍स्ट्थलों‍के‍जनयजजजत‍जाकाु‍के‍मा्यम‍ुे‍नए‍ अााुीय‍स्ट्टॉक‍के‍जनमावण‍के‍ुाथ‍–ुाथ‍मौजूदा‍अााुीय‍स्ट्‍टॉक‍दजनों‍में‍ुुधार‍की‍ुुजाधा‍प्रदान‍करती‍ू।, ‍ यू‍िूर‍के‍ऄजनयजजजत‍क्षेत्रों‍की‍चुनौजतयों‍और‍जाजिष्ट‍अाश्यकताओं‍का‍भी‍ुमाधान‍करती‍ू।, 7.1.2 यजजना‍की‍कायवनीजतयााँ‍जनम्नजलजखत‍ुुजाधाएाँ‍प्रदान‍करेंगी:50 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] i) ुस्ट्‍ते‍दकराया‍अााु‍अदद‍प्रदान‍करके‍अााु‍जाकल्पों‍की‍ईन्नत‍ईपलब्धता ii) पुराने‍और‍ऄजनयजजजत‍क्षेत्रों‍में‍बढ़ा‍ुएअ‍जनर्नमत‍पयावारण, ुुरक्षा‍और‍जीान‍की‍गणु ािा 7.2 अााु‍की‍अपर्नू त‍म‍ेंुधु ार‍के‍जलए‍ुमग्र‍दजृ ष्टकजण 7.2.1 ददल्ली‍म‍ेंभजाष्य‍की‍अााु‍अपूर्नत‍कज‍जनम्नजलजखत‍के‍मा्यम‍ुे‍पूरा‍दकया‍जाएगाः i) लैंड‍पूललग‍के‍मॉडल‍का‍ईपयजग‍करके‍िूर‍के‍ग्रीनफील्ड‍क्षेत्रों‍में‍ुेक्टरों‍का‍बड़े‍प,माने‍पर‍जाकाु।‍ जचजननत‍भूजम‍पूललग‍क्षेत्रों‍में‍17-20‍लाख‍अााुीय‍आकाआयों‍कज‍जाकजुत‍करने‍की‍क्षमता‍ू,; (देख:ें‍डीइाी1) ii) ूररत‍जाकाु‍क्षेत्र‍के‍ऄन्दर‍कम‍घनत्ा‍और‍कम‍एफएअर‍अााुीय‍क्षेत्रों‍का‍जाकाु‍(देख:ें‍ डीइाी2)। iii) ुघनता‍के‍मा्‍यम‍ु‍े मौजूदा‍स्ट्‍टॉक‍में‍ुुधार‍और‍नइ‍आकाआयों‍के‍ुृजन‍दजनज‍के‍ऄनुुार‍जाद्यमान‍ क्षेत्रों‍का‍पुररूद्धार‍(देखें‍डीइाी‍3)। iv) प्‍लॉटज‍के‍पुनर्ननमाणव ‍के‍एक‍भाग‍के‍रूप‍में‍बढ़े‍ुएए‍ऄनमु ेय‍अााुीय‍एफएअर‍का‍ईपयजग‍ (एमपीडी-62‍ के‍बाद‍ुे‍अााुीय‍एफएअर‍दजगुना‍ूज‍गया‍ू), ‍भी‍पयावप्त‍यजगदान‍करेगा। 7.2.2 यजजना‍ऄाजध‍के‍दौरान‍अााुीय‍जाकाु/पुनर्नाकाु‍का‍नेतृत्ा‍करने‍ााल‍े जनजी‍क्षेत्र‍के‍ुाथ,‍अपूर्नत‍ पररदश्ृ य‍म‍ें एक‍अदि‍व बदलाा‍की‍पररकल्पना‍की‍गइ‍ू।, ‍ुाावजजनक‍एजेंजुयााँ ‘ुुजाधाप्रदाता’‍की‍भूजमका‍ जनभाएंगी‍और‍ईपयि ु ‍जनयामक‍ााताारण‍के‍मा्यम‍ुे‍काय‍वप्रदक्रया‍की‍ुुगमता‍कज‍ुुजनजित‍करेंगी। 7.2.3 ुभी‍अााुीय‍क्षेत्रों‍का‍जाकाु‍प,दल‍दरू ी‍के‍ऄतं गतव ,‍ऄपेजक्षत‍स्ट्थानीय‍ुुजाधाओं‍के‍ुाथ‍ुंपूणव‍पड़जु‍के‍ रूप‍म‍ेंदकया‍जाएगा।‍ऐुी‍ुुजाधाएाँ‍अााुीय‍ल‍ेअईट‍के‍एक‍भाग‍के‍रूप‍में‍प्रदान‍की‍जाएंगी। 7.2.4 ुभी‍अय‍ुमूूों‍म‍ें प्रााुी‍जनुाँख्या‍की‍अााुीय‍अाश्यकताओं‍का‍ुमाधान‍करन‍े के‍जलए, िूर‍के‍ऄंदर‍ दकराये‍और‍ुस्ट्ते‍अााु‍कज‍बढ़ााा‍ददया‍जाएगा; जािेीकर‍पारगमन‍के‍जनकटाती‍क्षेत्रों‍में।‍टीओडी‍के‍ जलए‍ुाावजजनक‍पररयजजनाए‍ंया‍बड़े‍स्ट्तर‍पर‍‍जािेी‍रूप‍ु‍ेआु‍तरू‍के‍दकराय‍े के‍ुस्ट्त‍ेअााुीय‍जाकल्पों‍ के‍जनमावण‍पर‍ऄपना‍्यान‍केंदद्रत‍कर‍ुकती‍ू।ैं ‍जनजी‍क्षेत्र‍कज‍दकराये‍पर‍अााु‍प्रदान‍करने‍ूते ‍ु प्रजत्ुाजूत‍करने‍के‍जलए‍प्रजत्ुाून‍राजि‍का‍प्रस्ट्ताा‍भी‍ददया‍जाएगा। 7.2.5 भूजम‍की‍ुीजमत‍ईपलब्धता‍कज‍देखत‍े ुएए,‍40-60‍ाग‍व मीटर‍के‍छजटे‍अकार‍के‍अााुीय‍आकाआयों‍के‍ जाकाु‍कज‍ुुजनजित‍करते‍ुएए‍अााु‍की‍अपूर्नत‍कज‍ऄजधकतम‍दकया‍जाएगा। 7.3 नए‍जाकाु‍क्षत्रे ों‍म‍ेंअााु 7.3.1 लैंड‍पूललग‍क्षेत्रों‍में‍जाकाु‍कइ‍अााुीय‍टाआपजलॉजी‍का‍जनमावण‍करने‍का‍ऄाुर‍प्रदान‍करता‍ू।, ‍दकराय‍े के‍अााु‍(ुस्ट्ते‍दकराये‍के‍अााु‍ुजूत)‍के‍जाकाु‍कज‍प्रजत्ुाजूत‍दकया‍जाएगा।‍ुेक्टर‍स्ट्तर‍पर, छजटे‍ अााुीय‍प्रारूप‍बनान‍ेके‍जलए‍िुद्ध‍अााुीय‍एफएअर‍का‍25%‍ईपयजग‍म‍ेंलाया‍जाएगा। 7.3.2 कम‍ुघनता‍ााल‍े अााुीय‍प्‍लॉटज‍(एलडीअरपी) पर,‍कम‍ुघनता‍ााली‍अााुीय आकाआयों,‍ुेााजनाृि‍ गृू,‍बुजगु ों‍और‍जािेी‍जरुरतों‍ााल‍े ्जि यों‍के‍जलए‍ुूायक‍अााु‍की‍अााुीय‍टाआपजलॉजी‍की‍ ऄनुमजत‍प्रदान‍की‍जाएगी।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 51 7.4 जाद्यमान‍के‍जनयजजजत‍अााुीय‍क्षत्रे ों‍का‍पनु रूद्धार: 7.4.1 नए‍अााु‍का‍जनमावण‍करन‍े के‍जलए‍ िूरी‍भूजम‍के‍ुाोिम‍ईपयजग‍कज‍ुक्षम‍बनाएगा‍और अााु‍की‍ गुणािा‍में‍ुुधार‍लाने‍के‍जलए‍और‍प्रत्येक‍क्षेत्र‍कज, नागररक‍ुुजाधाओं‍तक‍न्यायुंगत‍पुएचाँ और‍ मनजरंजनात्मक‍स्ट्थलों‍के‍ुाथ,‍जस्ट्थजत‍के‍ऄनरूु प‍ढलने‍ााल‍ेअत्मजनभवर‍पड़जु‍में‍पररार्नतत‍दकया‍जाएगा। 7.4.2 ुभी‍जनयजजजत‍अााुीय‍क्षेत्रों, ुरकारी‍स्ट्ााजमत्ा‍ााले‍अााु‍और‍स्ट्‍लम‍पनु ाावु‍यजजनाओं‍के‍ऄजतररि के‍जलए‍पनु रूद्धार‍प्राथजमक‍रूप‍ु‍े एक‍जनजी‍क्षेत्र‍ु‍े जुडी‍पूल‍ूजगी।‍भूखंडों‍का‍एकीकरण‍और‍एफएअर‍ ुे‍जुड़े‍प्रजत्ुाून‍राजियों‍की‍ऄनुमजत‍दी‍जाएगी। 7.4.3 ुमूू‍अााु‍यजजनाओं‍का‍एक‍भाग‍रूप‍ूजगा‍और‍ऐुी‍पररयजजनाएं‍एमपीडी‍प्रााधानों‍के‍ऄनुुार‍ुस्ट्त‍े अााु‍ईपलब्ध‍कराएाँगी। 7.5 जाद्यमान‍के‍ऄजनयजजजत‍अााुीय‍क्षत्रे ों‍का‍पनु रूद्धार 7.5.1 ऄनजधकृत‍कॉलजजनया‍ाँ (युू ी’): यूुी’‍का‍‍डीइाी3‍के‍प्रााधानों‍के‍ऄनुुार‍दकया‍जाएगा।‍बस्ट्ती‍के‍ुभी‍ भागों‍कज‍एम्बलु ेंु‍और‍फायर‍टेंडर,‍ज,ु‍े अपातकालीन‍ााूनों‍के‍जलए‍ुुलभ‍बनान‍े ूते ‍ु बस्ट्ती‍स्ट्तर‍पर‍ ुुधार‍दकये‍जाने‍की‍अाश्यकता‍ूजगी।. i) क्षेत्रों‍के‍एकीकरण‍और‍ुंयुि ‍पुनरूद्धार‍कज‍ुुगम‍बनाने‍के‍जलए‍मानदडं ों‍म‍ें ईपयुि ‍प्रजत्ुाून‍और‍ छूट‍प्रदान‍की‍जाएगी। ii) यू‍देखत‍े ुएए‍दक‍आन‍क्षेत्रों‍म‍ें अााुीय‍ुघनता‍ऄजधक‍ू,, आुजलए िूरी‍‍के‍मानदडं ों‍के‍ऄनुुार,‍ ुुजाधाओं‍के‍जनमावण‍के‍जलए‍ुुजाधा‍(एमेजनटी)‍एफएअर‍एक‍प्रजत्‍ुाून‍के‍रूप‍म‍ें प्रदान‍दकया‍जा‍ ुकता‍ू।, 7.5.2 ुम्बंजधत‍एजेंजुयााँ‍और‍भूस्ट्ाामी‍यूुी‍के‍अगे‍के‍जाकाु‍और‍दकुी‍प्रकार‍के‍ऄनजधकृत‍जनमावण‍की‍ गजतजाजध‍कज‍रजकने‍के‍जलए‍लडैं ‍पूललग‍क्षेत्रों, जीडीए‍और‍िूर‍के‍ऄन्य‍खाली‍पड़ी‍भूजम‍के‍ऄंतगवत‍ऄपनी‍ भूजम‍की‍ुुरक्षा‍ुुजनजित‍करेंगी। 7.5.3 िूरी‍गाााँ ः‍िूरी‍गााँा‍िूर‍के‍ऄन्दर‍ऄजनयजजजत‍जाकाु‍के‍ऄलग‍क्षेत्र‍(अआलण्, ‍ड)‍के‍रूप‍म‍ेंईभरे‍ू।ैं ‍ईनके‍ पाु‍यूुी‍के‍ुमान‍मुद्दे‍ू‍ैं और‍ा‍े दकराय‍े के‍अााु‍के‍प्रमखु ‍केंद्रों‍के‍रूप‍म‍ें ईभरे‍ू।ैं ‍कइ‍िूरी‍गााँाों‍का‍ मूत्त्ा‍जाराुत‍ु‍े जड़ु ा‍ुएअ‍ू‍, और‍आनकज‍‍और‍ुंरक्षण‍नीजतयों‍के‍जमश्रण‍की‍अाश्यकता‍ूजगी।‍िूरी‍ गााँाों‍के‍जाकाु‍और‍पुनुुवधार‍के‍जलए‍जािेी‍जाजनयम‍आु‍यजजना‍की‍ऄजधुूचना‍के‍दज‍ाीों‍के‍ऄंदर‍ ददल्ली‍जाकाु‍प्राजधकरण‍द्वारा‍बनाए‍जाएंगे। 7.6 िूरी‍गरीबों‍के‍जलए‍अााु 7.6.1 मान्य‍स्ट्थलों‍पर‍जस्ट्थत‍स्ट्‍लम/जेजे‍ुमूूों‍कज‍स्ट्‍ास्ट्‍थाने‍स्ट्‍लम‍पुनाावु‍या‍क्षेत्र‍ुुधार‍स्ट्‍कीमों‍के‍मा्यम‍ु‍े ुुधारा‍जाएगा।‍ऄतं र्ननजूत‍स्ट्थल‍के‍ऄमान्य‍ूजने‍की‍जस्ट्थजत‍म‍ेंूी‍स्ट्थान‍पररातवन‍पर‍जाचार‍दकया‍जाएगा‍। 7.6.2 पनु ााुव ‍कॉलजजनया:ाँ पुनाावु‍कालजजनयों‍कज‍ुगु म्यता‍के‍मुद्दे, पयावप्त‍ुेााओं‍की‍कमी‍और‍जनमावण‍की‍खराब‍ गुणािा‍और‍जीण-व िीणव‍ूजने‍का‍ुामना‍करना‍पड़‍रूा‍ू।, ‍आन‍कॉलजजनयों‍कज‍डीइाी3‍के‍प्रााधानों‍के‍ ऄनुुार‍पनु रूद्धार‍दकया‍जाएगा।‍52 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 7.7 रेंटल‍ूाईलुग‍कज‍प्रजत्ुाजूत‍करना: 7.7.1 दजु नया‍भर‍के‍मूानगर‍जनााजुयों‍और‍प्रााजुयों‍कज‍प्रााु‍ऄाजध‍की‍ुुजाधा भौगजजलक‍गजतिीलता‍और‍ ुाम्यव‍(लज‍एंरी‍एण्ड‍ ‍एजक्जट‍कजस्ट्‍ट)‍प्रदान‍करने‍ााले‍एक‍जाजाध‍दकराये‍के‍अााु‍स्ट्टॉक‍कज‍बनाकर‍ रखते‍ू।ैं ‍िूर‍के‍जाकजुत‍भागों‍में‍भूजम‍की‍ईच्च‍लागत‍कज‍देखते‍ुएए‍यू‍जाजभन्न‍अय‍ुमूूों‍कज‍ईनके‍ कायवस्ट्थलों‍के‍जनकट‍अााु‍की‍ईपलब्धता‍ुुजनजित‍करता‍ू,, जजुुे‍यात्रा‍की‍दरू ी‍कम‍ूज‍ुके। 7.7.2 ुाावजजनक‍एजेंजुयााँ‍दकराये‍के‍अााु‍के‍रूप‍में‍ऄपनी‍अााु‍ुूजचयों‍का‍ऄनुपात‍त,यार‍करेंगी।‍यू‍ जाजभन्न‍स्ट्ारुप‍में‍ूज‍ुकते‍ू,ैं‍ज,ुे‍दक‍ुर्नास्ट्ड‍ऄपाटवमेंट, डॉर्नमटरी‍अदद।‍दकराये‍के‍जाकल्पों‍का‍जमश्रण,‍ज,ु‍े दक‍जनयंजत्रत‍दकरायों‍के‍ुाथ‍ुस्ट्त‍दकराये,‍बाजार‍के‍दकराये‍की‍आकाआयों, रेंट‍टू‍ओन‍मॉडल‍का‍पता‍लगाया‍ जा‍ुकता‍ू।, ‍ुाावजजनक‍एजेंजुयााँ‍ऐुी‍ुंपजि‍का‍ईपयजग‍ुुजनजित‍करन‍े के‍जलए‍ऄपने‍ऄनजबके/खाली‍ ुाावजजनक‍अााु‍स्ट्टॉक‍कज‍दकराये‍के‍बाजार‍म‍ेंल‍ेजाने‍पर‍भी‍जाचार‍कर‍ुकती‍ूैं। 7.7.3 ऄफजडेबल‍पजब्लक‍रेंटल‍ूाईलुग‍(एपीअरएच): डीडीए‍और‍ऄन्य‍ुंबंजधत‍ुाावजजनक‍एजेंजुयााँ‍दकराये‍के‍ ुस्ट्ते‍घर‍की‍ईपलब्धता‍म‍ेंुुधार‍लाने‍के‍जलए‍गजतजाजध‍केंद्रों‍(औद्यजजगक‍क्षेत्रों, ि,जक्षक‍केंद्रों‍अदद)‍के‍जनकट‍ जस्ट्थत‍ुाावजजनक‍भूजम‍पर‍ुमर्नपत‍एपीअरएच पररयजजनाओं‍कज‍अरंभ‍कर‍ुकती‍ू।ैं 7.7.4 ुमूू‍अााु‍पररयजजनाओं‍के‍एक‍भाग‍के‍रूप‍म‍ें बड़ी‍ुख्ं या‍म‍ें बनाइ‍गइ‍इडब्ल्यूएु‍की‍अााुीय‍ आकाआयााँ‍दकराये‍के‍ुस्ट्त‍े अााुीय‍स्ट्टॉक‍की‍ईपलब्धता‍म‍ें ुधु ार‍लान‍े के‍ऄाुर‍प्रदान‍करती‍ू।ैं ‍आु‍े ुुकर‍ बनाने‍के‍जलए‍ईपयुक्त‍ ‍मॉडल‍का‍पता‍लगाया‍जाए।ुरकारी‍एजेंजुयों‍की‍जनयजि ा‍अााु‍पररयजजनाओं‍ कज‍ुक्षम‍प्राजधकारी‍के‍ऄनुमजदन‍के‍बाद‍इडब्ल्यूएु‍अााु‍के‍प्रााधान‍ुे‍छूट‍दी‍जा‍ुकती‍ू।, 7.7.5 आु‍तरू‍के‍दकराये‍की‍ुंपजि‍के‍प्रबंधन‍म‍ें ुुधार‍लान‍े के‍जलए, ुाावजजनक‍एजेंजुयााँ‍दकराया‍प्रबंधन‍ एजेंजुयों‍और‍अााु‍ुग्रं ूकतावओं‍की‍ुेााएं‍ल‍े ुकती‍ू।ैं ‍ईपलब्धता, स्ट्थान, दकराया‍अदद‍के‍बारे‍म‍ें जानकारी‍देने‍ााला‍एक‍ऑनलाआन‍पजटवल‍बनाया‍जाएगा। 7.7.6 रेंटल‍ूाईलुग‍या‍ऄन्य‍ग,र-स्ट्ााजमत्ा‍ााले‍प्रारूपों,‍ज,ु‍े दक‍ुर्नास्ट्ड‍ऄपाटवमेंट, श्रजमक‍अााु, अदद‍कज‍लाग‍ू करने‍ूते ‍ु जनजी‍क्षेत्र‍कज‍प्रजत्ुाजूत‍करन‍े के‍जलए‍प्रजत्ुाून‍राजि‍भी‍जनम्नानुुार‍प्रदान‍की‍जाएगी: i) औद्यजजगक‍क्षेत्र‍और‍भाण्ड‍ ागार/माल‍पररुर‍15%‍ऄजतररि ‍एफएअर‍का‍ईपयजग‍करके‍ाूनीय‍ रेंटल‍ूाईलुग‍आकाआयों‍का‍जाकाु‍करेंगे। ii) ुमूू‍अााु‍पररयजजनाओं‍के‍एक‍भाग‍के‍रूप‍म‍ेंरेंटल‍ूाईलुग‍कज‍प्रजत्ुाजूत‍दकया‍जाएगा। iii) िूर‍में‍ुभी‍ग्रीनफील्ड, पुनर्ननमावण‍और‍‍पररयजजनाओं‍में‍रेंटल‍ूाईलुग‍कज‍ऄनुमजत‍और‍प्रजत्ुाून‍ ददया‍जाएगा। 7.7.7 रेंटल‍ूाईलुग‍ूते ‍ु परराेि‍कज‍ुक्षम‍बनाकर‍प्रचजलत‍दकराया‍ऄजधजनयमों/कानूनों/जनयमों‍के‍ुंिजधन‍द्वारा‍ और‍बेूतर‍बनाया‍जाएगा। --- x --- x ---- x --- x --- ऄ्याय कजड 8.0 ुामाजजक‍ऄाुरं चना‍का‍प्रााधान SSI2[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 53 8.1.1 ुामाजजक‍ऄाुंरचना‍में‍स्ट्ाास्ट््य, जिक्षा, ुामाजजक-ुांस्ट्कृजतक‍ुुजाधाओं, ुुरक्षा‍और‍ुंरक्षा‍ऄाुंरचना, ुंचार, जातरण‍की‍ुुजाधाओं‍और‍ऄन्य‍कायों‍ुजूत‍ुाावजजनक‍और‍ऄधव-ुाावजजनक‍(पीएुपी) ुुजाधाओं‍की‍ एक‍जास्ट्तृत‍श्रृंखला‍ुजम्मजलत‍ू।, ‍ुामाजजक‍ऄाुंरचना‍का‍जनयजजन, जाकाु‍और‍जातरण‍कइ‍ुेाा‍प्रदाता‍ एजेंजुयों‍के‍मा्यम‍ु‍े दकया‍जाता‍ू।, ‍यू‍यजजना‍ईच्च‍गुणािा‍ााली‍ुामाजजक‍ऄाुंरचना‍की‍ईपयुि ता‍और‍ ुुलभता‍कज‍बढ़ाने‍के‍जलए‍एक‍रूपरेखा‍प्रदान‍करती‍ू‍,जज‍ुभी‍जूतधारकों‍की‍अाश्यकताओं‍कज‍परू ा‍करता‍ू।, 8.1.2 यजजना‍की‍कायवनीजतयााँ‍जनम्न‍ुुजाधाएाँ‍प्रदान‍करेंगी: i) ुामाजजक‍ऄाुंरचना‍की‍बेूतर‍ईपलब्धता‍और‍पुएचं ii) बदलती‍अाश्यकताओं‍के‍ऄनुुार,‍नए‍ईपयजगों/कायों‍कज‍िरूु ‍करन‍े के‍जलए‍बढ़ा‍ुएअ‍लचीलापन 8.2 ुामाजजक‍ऄाुरं चना‍की‍ईपलब्धता‍म‍ेंुधु ार‍लान‍ेके‍जलए‍मख्ु य‍कायनव ीजतया ाँ 8.2.1 ुामाजजक‍ऄाुंरचना‍के‍जलए‍ईपलब्ध‍भूजम/स्ट्थान‍का‍ुाोिम‍ईपयजग: i) ुामाजजक‍ुुजाधाओं‍कज‍ार्टटकल‍जमलक्ुग‍के‍मा्यम‍ुे‍जनर्नमत‍क्षेत्र‍के‍एक‍भाग‍के‍रूप‍में‍जाकजुत‍ करने‍के‍जलए‍लचीलापन‍प्रदान‍दकया‍जाता‍ू।, ‍आुुे‍ईन‍क्षेत्रों‍में‍ुुजाधाएं‍जनर्नमत‍करने‍में‍ुूायता‍ जमलेगी,‍जूां‍पर‍पयावप्त‍भूजम‍ईपलब्ध‍नूीं‍ू।, ii) स्ट्थानीय‍स्ट्तर‍की‍ुुजाधायुि ‍प्‍‍लॉटज‍कज‍'बुए-ुुजाधायुि ‍प्‍लॉटज' के‍रूप‍म‍ें माना‍जाएगा‍जजनका‍ ईपयजग‍अाश्यकताओं‍के‍ऄनुु ार‍ऄनुकूल‍ुुजाधाओं‍की‍जस्ट्थजत‍का‍पता‍लगान‍े के‍जलए‍दकया‍जा‍ ुकता‍ू।, ‍ऐुे‍प्‍लॉटज‍कज‍कइ‍ईपयजगों‍कज‍ुमायजजजत‍करने‍के‍जलए‍एफएअर‍बढ़ान‍े की‍ऄनमु जत‍दी‍ जाएगी। iii) ुूायक‍ईपयजगों‍के‍जलए‍पीएुपी‍ुाआटों‍कज‍एफएअर के‍एक‍भाग‍का‍ईपयजग‍करन‍े की‍ऄनुमजत‍ दी‍जाएगी।‍आुुे‍ईपलब्ध‍ुामुदाजयक‍ुुजाधाओं,‍ज,ुे‍दक‍बुएईद्देिीय‍ूॉल, ुामाजजक‍ुांस्ट्कृजतक‍ केन्द्रों‍अदद‍के‍बेूतर‍ईपयजग‍में‍ुूायता‍जमलगे ी‍। यू‍कायवनीजत‍ुुजाधाओं‍के‍पयावप्त‍प्रााधान‍कज‍ुुजनजित‍करेगी, जजुुे‍जीान‍की‍गणु ािा‍में‍ुुधार‍ ूजगा‍और‍जाकेंद्रीकृत, अत्मजनभवर‍क्षेत्र‍ुगु म‍बनगें े। 8.2.2 मौजदू ा‍ुजु ाधाओं‍का‍ुरं क्षण‍और‍ुां धनव i) ुुजाधाओं‍म‍ें ुुधार‍कज‍ुगु म‍बनाने‍ूते ‍ु यजजना‍क्षेत्र‍के‍ऄंदर‍ुुजाधायुि ‍प्‍लॉटज‍कज‍ुजम्मजलत‍करन‍े के‍ जलए‍पुनरूद्धार‍यजजनाओं‍की‍ऄनुमजत‍दी‍जाएगी।डीइ‍कज‍नए‍जडजाआन‍के‍मानदडं ों‍के‍ऄनुुार‍ ुमान‍या‍ऄजधक‍ुुजाधाएाँ‍प्रदान‍करनी‍ूोंगी। ii) ऄनााश्यक‍/‍ऄजाकजुत‍/‍ऄप्रयुि ‍ुामाजजक‍ऄाुंरचना‍प्ल‍ ॉटज‍कज‍ऄन्य‍पीएुपी‍ईपयजगों‍की‍ओर‍ जास्ट्थाजपत‍करन‍े की‍ऄनुमजत‍दी‍जाएगी।‍आुुे‍यू‍ुुजनजित‍ूजगा‍दक‍पीएुपी‍भूजम‍के‍ुीजमत‍ ुंुाधनों‍का‍पूरी‍तरू‍ु‍ेईपयजग‍दकया‍गया‍ू,। 8.2.3 ुभी‍के‍जलए‍ुजु ाधाएं‍ुजु नजित‍करना 8.2.3.1 बच्चों, मजूलाओं, बुजुगों, जािेी‍क्षमता‍ााल‍े लजगों‍और‍अर्नथक‍रूप‍ुे‍कमजजर‍पष्ठृ भूजम‍ााले‍ परराारों‍कज‍डीुीएन के‍ऄनुुार‍ुुजाधाएाँ‍प्रदान‍की‍जाती‍ू।ैं54 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 8.2.3.2 ुभी‍नइ‍ुुजाधाओं‍और‍ुाावजजनक‍ुुजाधाओं‍कज‍ुभी‍तक‍पुएचाँ ाने‍और‍ईपयजग‍की‍ुुगमता‍कज‍ ुुजनजित‍करने‍के‍जलए‍जाकजुत/जडज़ाआन‍दकया‍जाएगा।‍आुे‍ुुजनजित‍करन‍े के‍जलए‍ातमव ान‍ ुुजाधाओं‍कज‍पुनःुंयजजजत‍दकया‍जा‍ुकता‍ू।, 8.2.3.3 पीएुपी ुुजाधाओं‍का‍जनमावण‍ऄपयावप्त‍रूप‍ुे‍ऄजनयजजजत‍क्षेत्रों‍में‍भी‍जनम्न‍ जलजखत‍के‍द्वारा‍ दकया‍जाएगा: i) प्राथजमक‍स्ट्ाास्ट््य‍और‍जिक्षा‍ज,ुी‍अाश्यक‍ुामाजजक‍ऄाुंरचना‍के‍जलए‍प्‍लॉट‍क्षेत्र, ुेट- ब,क‍अदद/जनर्नमत‍क्षेत्र‍के‍जलए‍घटाए‍गए‍मानदडं । ii) ऄजनयजजजत‍क्षेत्रों‍के‍जलए‍पनु रूद्धार‍यजजना‍के‍ऄनुमेय‍एफएअर‍के‍ऄजतररि ,‍एफएअर‍की‍ ुुजाधाएाँ‍प्रदान‍की‍जाएगं ी।‍ऐुे‍एफएअर‍का‍ईपयजग‍ऄजनाायव‍ुुजाधाओं‍के‍जाकाु‍के‍ जलए‍ऄजनाायव‍रूप‍ुे‍दकया‍जाएगा। 8.3 ुामाजजक‍ऄाुरं चना‍का‍ऄनक्रु म 8.3.1 आु‍यजजना‍में‍ुामाजजक‍ऄाुंरचना‍के‍ागीकरण‍ुे‍जड़ु ी‍जनम्नजलजखत‍जनुंख्या‍का‍प्रााधान‍ू ,: i) स्ट्थानीय‍स्ट्तर: स्ट्थानीय‍जनुख्ाँ या‍की‍ददन-प्रजतददन‍की‍अाश्यकताओं‍कज‍पूरा‍करने‍के‍जलए, 10,000‍की‍जनुाँख्या‍में‍ुुजाधाओं‍का‍पयावप्‍त‍रूप‍ुे‍जातरण‍दकया‍जाएगा। ii) ुामदु ाजयक‍स्ट्तरः ुामुदाजयक‍स्ट्तर‍की‍ुामाजजक‍ऄाुंरचना‍1‍लाख‍तक‍की‍जनुंख्या‍कज‍ुेााएाँ‍ प्रदान‍करेगी। iii) ईप-िूरी‍स्ट्तरः‍बड़ी‍स्ट्तर‍की‍ुुजाधाएाँ‍5‍लाख‍तक‍की‍जनुाँख्या‍कज‍ुेााएाँ‍प्रदान‍करेगी‍और‍ आनका‍जातरण‍ईप-िूरी‍स्ट्तर‍पर‍दकया‍जाएगा। iv) िूरी‍स्ट्तरः िूरी‍स्ट्तर‍की‍ुामाजजक‍ऄाुंरचना‍िूर‍के‍ुाथ-ुाथ‍आु‍क्षेत्र‍की‍अाश्यकताओं‍ की‍भी‍पूर्नत‍करेगी। 8.4 जाजभन्न‍प्रकार‍की‍ुामाजजक‍ऄाुरं चना‍और‍ुजु ाधाए ाँ 8.4.1 स्ट्ाास्ट््य‍दखे भाल 8.4.1.1 स्ट्ाास्ट््य‍ुेााओं‍में‍ईभरती‍अाश्यकताओं‍का‍ुमाधान‍जनम्नानुुार‍पयावप्त‍ुुजाधाओं‍के‍प्रााधान‍ द्वारा‍दकया‍जाएगा: i) ुामान्य, जाजिष्ट‍स्ट्ाास्ट््य‍ुेाा, ा,कजल्पक‍जचदकत्‍ुा‍पद्धजत‍और‍ुूायक‍जचदकत्ुा‍ुेाा। ii) बुजुगों,‍ददव्‍यांगज‍के‍जलए‍और‍जािेी‍अाश्यकताओं‍ााल‍े लजगों‍के‍जलए‍देखभाल‍की‍ ुुजाधा, िारीररक‍ और‍ मानजुक‍ स्ट्ाास्ट््य‍ की‍ देखभाल‍ के‍ जलए‍ ुुजाधाएं, निामुजि ‍ केंद्र/निामुजि ‍पुनाावु‍केंद्र, देखभाल‍केंद्र‍अदद। iii) तृतीयक‍स्ट्ाास्ट््य‍ुेाा‍और‍ुंबंजधत‍ऄनुुंधान‍एां‍जाकाु‍ुुजाधाओं‍का‍ुमूू 8.4.2 जिक्षा[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 55 8.4.2.1‍जिक्षा‍ुुजाधाओं‍के‍जाकाु‍के‍जलए‍दज‍दीघवकाजलक‍दजृष्ट‍कजण‍ऄपनाए‍गए‍ू:ैं i)‍ुभी‍क्षेत्रों‍में‍स्ट्‍कूल‍स्ट्‍तर‍की‍जिक्षा‍की‍ईपलब्‍धता‍/‍पुएचं ‍कज‍ुुजनजश्‍चत‍करना‍। ii)‍रजजगार,‍ईभरते‍अर्नथक‍ुक्े ट‍रों‍और‍ईद्यजग‍की‍अाश्‍यकताओं‍के‍जलए‍कौिल‍जाकाु‍ऄाुरों‍ुजूत‍ ईच्‍च‍जिक्षा‍का‍एकीकरण‍करना iii)‍दद्ांगजन‍ऄजधकार‍ऄजधजनयम‍2016‍के‍प्रााधानों‍के‍ऄनुुार‍दद्ांग‍बालकों‍एा‍ं ्जि यों‍या‍जािेी‍ जरुरतों‍ााले‍्जि यों‍के‍जलए‍जिक्षा‍एां‍प्रजिक्षण‍ुुजाधाओं‍की‍ईपलब्धता‍बढ़ाना। iv) जििुओं‍और‍बच्चों‍कज‍ुंपणू ‍व जाकाु‍ुुजनजित‍करने‍के‍जलए‍प्रारंजभक‍जिक्षा‍और‍बाल‍दखे भाल‍ुुजाधाओं‍ की‍्ास्ट्था‍करन‍े और‍ईनके‍परराारों‍और‍कायविील‍मजूलाओं‍कज‍ुूायता‍प्रदान‍करन‍े पर‍जािेी‍बल‍ देना। 8.4.2.2 ददल्ली‍के‍ुभी‍नए‍और‍ुमााेिी‍(जािेी‍अाश्यकताओं‍ााले‍बच्चों‍की‍अाश्यकताओं‍ुे‍ुम्बंजधत)‍स्ट्कूलों‍कज‍ एकीकृत‍दकया‍जाएगा‍(ऄथावत‍् प्री-प्राआमरी‍ुे‍ईच्च‍मा्यजमक‍स्ट्तर‍तक)।‍जािेी‍जरुरतों‍ााले‍बच्चों‍के‍जलए‍स्ट्कूलों‍की‍ ऄनुमजत‍स्ट्टैंड‍ऄलजन‍ुुजाधा‍के‍रूप‍में‍दी‍जाएगी। 8.4.2.3‍ददल्ली‍के‍मूत्ापणू व‍अर्नथक‍क्षेत्रों‍के‍रूप‍म‍ें ईभर‍रू‍े ईच्च‍जिक्षा‍एां‍ज्ञान‍ईद्यजग‍कज‍औद्यजजगक‍क्षेत्रों,‍बीपीडी‍ और‍टीओडी‍के‍ऄन्तगवत‍बढ़ााा‍ददया‍जाएगा। 8.4.3 ुामाजजक-ुास्ट्ं कृजतक‍ुजु ाधाए ाँ 8.4.3.1 एक‍ुांस्ट्कृजतक‍केंद्र‍के‍रूप‍म‍ें ददल्ली‍की‍जाजिष्टता‍कज‍ुुदढ़ृ ‍करन‍े के‍जलए, आु‍यजजना‍म‍ें नए‍गंत्ों‍ (ुम्मेलन/्ाख्यान‍केंद्र, जथयेटर, ुंग्रूालय, अदद)‍कज‍जनर्नमत‍करन‍े के‍ुाथ-ुाथ,‍नए‍ऄनुभा‍ (ुांस्ट्कृजतक‍प्राृजि, अर्नथक‍केन्द्रों, अदद)‍प्राप्त‍करने‍का‍प्रस्ट्ताा‍दकया‍गया‍ू,। 8.4.3.2 आु‍तरू‍के‍िूरी‍स्ट्तर‍के‍ुामाजजक-ुांस्ट्कृजतक‍ईपयजगों‍कज‍पुराताजत्ाक‍ईद्यानों‍और‍प्राकृजतक‍ नालों‍के‍ुाथ-ुाथ,‍ूररत‍बफर‍के‍एक‍भाग‍के‍रूप‍म‍ेंऄनुमजत‍प्रदान‍की‍जाएगी।‍ूररत‍जाकाु‍क्षेत्र‍ में‍बड़े‍प्रारूप‍के‍प्रदिवन‍स्ट्थलों‍और‍ुम्मेलनों‍के‍ुुजाधाओं‍की‍ऄनुमजत‍भी‍दी‍जाएगी। 8.4.3.3 स्ट्थानीय‍ स्ट्तर‍ की‍ ुामाजजक-ुांस्ट्कृजतक‍ ुुजाधाओं‍ कज‍ जाजभन्न‍ अाश्यकताओं,‍ ज,ुे‍ दक‍ ाररष्ठ‍ नागररकों, युााओं, परराारों, अदद‍की‍ुेाा‍के‍जलए‍ुुदढ़ृ ‍दकया‍जाएगा।‍बुएईद्देश्यीय‍स्ट्थलों‍म‍ें कौिल‍जाकाु‍केंद्रों/प्रजिक्षण‍केंद्रों/ुभा‍स्ट्‍थलों/‍पुस्ट्तकालयों‍/‍बाल‍देखभाल‍की‍ुुजाधाओं‍अदद‍की‍ स्ट्थानीय‍अाश्यकताओं‍कज‍ुमायजजजत‍दकया‍जाएगा। 8.4.4 बचाा‍और‍ुरु क्षा‍ऄाुरं चना 8.4.4.1 कानून‍एां‍्ास्ट्था‍और‍ऄपराधों‍एां‍दघु वटनाओं‍ुे‍ुुरक्षा‍प्रदान‍करने‍के‍ुाथ-ुाथ,‍अपातकालीन‍ ुेााओं‍कज‍ुुजनजित‍करने‍का‍ईिरदाजयत्ा‍कइ‍एजेंजुयों‍के‍पाु‍ू,,‍ज,ुे‍दक‍ददल्ली‍ऄजग्निमन‍ुेाा,56 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ददल्ली‍पुजलु, ददल्ली‍र,दफक‍पजु लु‍और‍ददल्ली‍अपदा‍प्रबंधन‍प्राजधकरण।‍ऐुी‍ुुजाधाओं‍कज‍िूर‍ भर‍में‍ईजचत‍रूप‍ुे‍जातररत‍दकये‍जाने‍की‍अाश्यकता‍ू,, तदानुुार‍स्ट्थानीय‍और‍ईप-िूरी/िूरी‍ स्ट्तर‍पर‍ऐुी‍ुुजाधाओं‍के‍जाकेंद्रीकरण‍की‍ुंस्ट्तुजत‍की‍गयी‍ू, 8.4.4.2 प्रजिक्षण‍ुुजाधाओं‍/‍ुुरक्षा‍कैंप,‍परेड‍ग्राईंड, अदद;‍जजन्ू‍ें बड़े‍क्षेत्रों‍की‍अाश्यकता‍ूजती‍ू,,‍का‍ िूरी‍स्ट्तर‍की‍ऄाुंरचना‍के‍एक‍भाग‍के‍रूप‍में‍भी‍प्रस्ट्ताा‍दकया‍गया‍ू।, 8.4.5 डाक‍और‍दरू ुचं ार‍ुजु ाधाए ाँ 8.4.5.1 जपछल‍े दज‍दिकों‍के‍दौरान,‍डाक‍एां‍दरू ुंचार‍ऄाुंरचना‍बड़े‍प,मान‍े पर‍पररार्नतत‍ूज‍गयी‍ू।, ‍ ुंबंजधत‍जाभाग/एजेंजुयां,‍अबंरटत‍भूजम/जनर्नमत‍स्ट्थान‍के‍ातवमान‍ईपयजग‍का‍अकलन‍करेंगे‍और‍ भूजम‍का‍बेूतर‍ईपयजग‍करने‍के‍जलए‍ुंभाानाओं‍का‍पता‍लगाएंगे। 8.4.6 जातरण‍ुबं धं ी‍ुजु ाधाए ं 8.4.6.1 स्ट्थानीय‍ स्ट्तर‍ पर‍ दधू , फल, ुब्जी‍ ज,ुी‍ ुुजाधाएं‍ ददन-प्रजतददन‍ की‍ अाश्यकताएाँ‍ ू।ैं ‍ आुके‍ ऄजतररि , अु‍पाु‍के‍क्षेत्रों‍म‍ेंपीडीएु‍ुुजाधाएं‍/ईजचत‍दर‍दकु ानें‍ईपलब्ध‍करायी‍जा‍ुकती‍ूैं। 8.4.6.2 घरेलु‍ईद्देश्य‍के‍जलए‍ईपयजग‍दकये‍जाने‍ााले‍पीएनजी, एलपीजी और‍ऄन्य‍ईंधनों‍अदद‍की‍अपूर्नत‍ के‍जलए‍ईप-िूरी‍और‍िूरी‍स्ट्तर‍की‍ुुजाधाओं‍की‍ऄनुकूल‍ईपयजग‍के‍क्षेत्रों‍में‍ऄनुमजत‍दी‍जाएगी। 8.4.7 श्मिान-कजब्रस्ट्तान-जुमरे ी‍की‍ुजु ाधाए:ाँ 8.4.7.1 आु‍श्रेणी‍के‍ऄतं गतव ,‍ुुजाधाओं‍का‍प्रााधान‍जाजभन्न‍धार्नमक‍ुमूूों‍की‍अाश्यकताओं‍पर‍अधाररत‍ ू।, ‍यू‍यजजना‍आु‍तरू‍की‍ुुजाधाओं‍कज‍ऄजधक‍पयावारण-ुंाेदनिील‍(ग,ु‍ुे‍प्रज्ाजलत‍/‍जाद्युत्‍/‍ पयावारण‍ऄनुकूल श्मिान‍ुुजाधाएाँ)‍बनान‍े के‍जलए‍ऄजभना‍दजृ ष्टकजण‍ऄपनान‍े के‍जलए‍प्रजत्ुाजूत‍ करता‍ू‍, और‍आु‍े ुमायजजजत‍करने‍के‍जलए‍ईपयुि ‍स्ट्थान‍ईपलब्ध‍कराता‍ू।, ‍पिुओं‍कज‍दफनाने‍के‍ जलए‍ऄलग‍ु‍ेभूजम‍जनधावररत‍की‍जानी‍चाजूए। 8.4.8 ुााजव जनक‍ुजु ाधाए ाँ 8.4.8.1 यूबीबीएल में‍जनधावररत‍और‍केंद्र‍ुरकार‍द्वारा‍जारी‍ुाावजजनक‍और‍ुामुदाजयक‍िौचालयों‍पर‍ परामिवदात्री‍प्रााधान‍(2018)‍के‍ऄनुुार‍ुाावजजनक‍ुुजाधाएाँ‍जाकजुत‍की‍जाएाँगी।‍आु‍तरू‍की‍ ुुजाधाएाँ‍बच्चों, मजूलाओं, बुजुगों‍और‍जािेी‍क्षमता‍ााल‍े ा‍य्‍ जक्त‍ यों‍की‍जरूरतों‍के‍ऄनुकूल‍ूोंगी‍ और‍आनम‍ें बाल‍देखभाल‍ुुजाधाओं‍ााल‍ेक्षेत्रों‍कज‍‍भी‍स्ट्‍थान‍ददया‍जाएगा। 8.4.8.2 ुाावजजनक‍ुुजाधाएाँ‍ईपयजग‍के‍ुभी‍क्षेत्रों‍म‍ें स्ट्ाीकायव‍ूोंगी‍और‍ुड़कों‍की‍ऄास्ट्थापना‍म‍ें दकये‍गए‍ुुधारों‍के‍एक‍भाग‍के‍रूप‍में‍भी‍ुुधार‍दकया‍जाएगा. 8.4.9 ‍ऄन्य‍ुामदु ाजयक‍ुजु ाधाए ाँ 8.4.9.1 ‍‍ऄन्य‍ुामुदाजयक‍ुुजाधाएाँ,‍ज,ुे‍दक‍धार्नमक‍ुुजाधाएं, देखभाल‍केंद्र, ाृद्धाश्रम, ऄनाथालय, नारी‍ जनकेतन, ुुधारात्मक‍ /‍ ईपचारात्मक‍ ुुजाधाएाँ‍ (दकिजर‍ ुधु ार‍गृू, देखरेख‍ केंद्र, बंदी‍गृू‍ की‍ ुुजाधाएं‍अदद)‍यजजना‍के‍ऄनुु ार‍प्रदान‍की‍जाएगी।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 57 --- x --- x ---- x --- x --- खडं ‍5 परराून‍और‍गजतिीलता पष्ृ ठ‍भजू म‍और‍प्रमखु ‍नीजतगत‍ुरजकार ददल्ली‍अााु, रजजगार, ईच्चतर‍जिक्षा‍और‍स्ट्ाास्ट््य‍ुुजाधाओं और‍ऄन्य‍ास्ट्तुओं‍एां‍ुेााओं‍के‍मामले‍में‍अुपाु‍के‍ िूरों‍(गड़ु गांा, नजएडा, ग्रेटर‍नजएडा, गाजजयाबाद‍और‍फरीदाबाद)‍के‍ुाथ‍मजबूत‍क्षेत्रीय‍जनभवरता‍के‍ुाथ‍एनुीअर‍ का‍केंद्र‍ू।, ‍यूां‍द,जनक‍अधार‍पर‍बड़े‍प,मान‍े पर‍लजगों‍और‍ास्ट्‍तुओं‍की‍क्षेत्रीय‍अााजाूी‍ूजती‍ू,, जजुके‍पररणामस्ट्ारूप‍ िूर‍की‍मौजूदा‍परराून‍ऄाुंरचना‍पर‍ऄत्य‍ जधक‍दबाा‍पड़ता‍ू।, ‍ुमीपाती‍िूरी‍केंद्रों‍में‍नए‍जाकाु‍और‍एकीकृत‍ फ्रेट‍कॉम्प्लेक्ु‍(अइएफुी), जेार‍में‍ऄंतरावष्ट्रीय‍ूााइ‍ऄड्डा, ददल्ली‍मुंबइ‍औद्यजजगक‍कॉररडजर‍(पजिमी)‍और‍ऄमृतुर‍ कजलकाता‍(पूाी),‍ुमर्नपत‍भाड़ा‍कॉररडजर‍अदद‍के‍रूप‍में‍अगामी‍क्षेत्रीय‍ऄाुंरचना‍ुे‍अगंतुकों‍और‍माल‍की‍ अााजाूी‍के‍प,टनव‍पर‍बुएत‍ऄजधक‍प्रभाा‍पड़ेगा‍और‍आन्‍ू‍ें िूर‍के‍जलए‍परराून‍कायवनीजतयों‍में‍िाजमल‍करने‍की‍ अाश्यकता‍ू।, मेरज‍की‍िरुु अत‍ु‍े ुीएनुीअर‍िूर‍और‍ऄजधक‍जनकट‍अ‍गए‍ू।ैं ‍ूालांदक, ुीएनुीअर‍के‍ऄंदर‍लजगों‍की‍अााजाूी‍ में‍मेरज‍की‍मूत्ापूणव‍भूजमका‍ूजने‍के‍बााजूद, ददल्ली‍के‍ऄंदर‍क्षेत्रीय‍कनेजक्टजाटी‍प्रदान‍करने‍ााली‍ुड़कें‍जाम,‍ऄत्य‍ जधक‍ यातायात‍प्रााू‍और‍ऄत्यजधक‍जालंब‍एां‍ुड़कों‍पर‍कतारों‍की‍ओर‍ुंकेत‍करती‍ू।ैं ददल्ली‍अर्नथक‍ुाेक्षण‍ररपजटव‍(2019-20) के‍ऄनुुार, ूालांदक‍ााून‍की‍जबक्री‍की‍ाार्नीक‍ाृजद्ध‍दर‍लगभग‍4.4%‍तक‍ अधी‍ूज‍गइ‍ू‍, दफर‍भी ददल्ली‍में‍प्रजत‍ूजार‍जनुंख्या‍पर‍ााूनों‍की‍ुंख्या‍2005-06‍में‍317‍ुे‍बढ़कर‍2019-20‍म‍ें दजगुनी‍ुे‍ऄजधक 643‍ूज‍गइ‍ू।, ‍ऄन्य‍मद्दु ों‍म,ें‍ााूनों‍की‍ुख्ं ‍या‍म‍ें ाृजद्ध‍पार्ककग‍की‍बढ़ती‍मांग‍म‍ें प्रकट‍ुएइ‍ू।, ‍पार्ककग‍ मांग‍प्रबंधन‍पर‍ुमान‍बल‍देत‍े ुएए‍पार्ककग‍कायवनीजतयों‍के‍मद्दु ों‍कज‍ुंबजजधत‍दकया‍जाना‍ू।, ददल्ली‍में‍द,जनक‍ुदक्रय‍यात्रा‍(प,दल‍चलना‍और‍ुाआदकल‍चलाना)‍ररप‍का‍ऄत्य‍ जधक‍बड़ा‍जूस्ट्ुा‍ू,, जज‍कुल‍ररप‍का‍42‍ प्रजतित‍ू।, ‍ूालांदक, जपछले‍एक‍दिक‍म,ें पदयात्रा‍की‍जूस्ट्ुेदारी‍में‍नगण्य‍ाृजद्ध‍ूी‍देखी‍गइ‍ू‍, और‍ुाआदकल‍ु‍े यात्राओं‍ में‍लगभग‍एक‍जतूाइ‍की‍कमी‍ Modal Split of Motorised Trips अइ‍ ू।, ‍ ददल्ली‍ की‍ ऄजधकािं ‍ ुड़कें‍ ऄुमान‍ ुड़क‍ स्ट्‍थल‍ जातरण‍और‍पयावप्‍त‍ऄाु‍ ंरचना‍ न‍ ूजने‍ के‍ कारण‍ पदयाजत्रयों‍ और‍ ुाआदकल‍ चलान‍े के‍ जलए‍ ऄनुकूल‍ नूीं‍ ू।ैं ‍ 2018‍ में, ददल्ली‍म‍ें अध‍े ुे‍ऄजधक‍घातक‍ ुड़क‍दघु वटनाओं‍में‍प,दल‍यात्री‍ और‍ ुाआदकल‍ चालक‍ िाजमल‍ थे।‍ददल्ली‍में‍ुड़क‍ुुरक्षा‍एक‍ मूत्ापूणव‍लचता‍के‍रूप‍में‍ईभरी‍58 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ू ,और‍एक‍ुरु जक्षत‍पदयात्रा‍और‍ुाआदकल‍चलाने‍यजग्‍य‍ााताारण‍बनान‍ेके‍ईपायों‍की‍तत्काल‍अाश्यकता‍ू।, ददल्ली‍म‍ें मेरज, ररग‍रेल‍और‍बु‍ुेााओं‍के‍रूप‍म‍ें एक‍मजबूत‍ुाावजजनक‍परराून‍नेटाकव‍ू।, ‍ऄंतःिूर‍में‍यात्राओं‍के‍ ऄलााा, मेरज‍में‍पयावप्‍त‍दरू ी‍तक‍क्षेत्रीय‍यात्राएं‍भी‍की‍जाती‍ू‍, और‍येलज, ब्लू‍और‍रेड‍लाआनों‍पर‍ुाावजधक‍यात्री‍दज‍व दकए‍गए‍ू‍ैं जज‍ददल्ली‍कज‍क्रमिः‍गुड़गांा, नजएडा‍और‍गाजजयाबाद‍के‍पड़जुी‍िूरों‍ुे‍जजड़ती‍ू।, ‍ुस्ट्ती‍कीमत‍और‍ नेटाकव‍कारेज‍के‍कारण‍बुें‍ुाावजजनक‍परराून‍का‍पुंदीदा‍और‍ुाावजधक‍पुएचं ‍के‍ऄंदर‍ााला‍तरीका‍ू।ैं ‍माल‍कज‍ लान-े ‍ले‍जान‍े के‍जलए‍ददल्ली‍की‍जाराुत‍ऄाुंरचना‍के‍एक‍जूस्ट्ु‍ े,‍ररग‍रेल‍का‍ईपयजग‍दकया‍जा‍रूा‍ू‍,और‍ातवमान‍म‍ें आुकी‍ुंभाजात‍यात्री‍ुाारों‍के‍केाल‍50%‍का‍ुंचालन‍दकया‍जा‍रूा‍ू।, ‍जबदक‍ररग‍रेल‍माल‍परराून‍म‍ें एक‍ मूत्ापूणव‍भूजमका‍जनभाता‍ू‍, और‍लगभग‍20,000‍रकों‍कज‍ददल्ली‍की‍ुड़कों‍ुे‍दरू ‍रखता‍ू,, लजगों‍के‍अाागमन‍म‍ें आुकी‍भूजमका‍के‍बारे‍में‍दफर‍ुे‍जाचार‍दकए‍जाने‍की‍अाश्यकता‍ू।, गजतिीलता‍के‍नए‍रुझान‍बताते‍ू‍ैं दक‍लजग‍ऐप-अधाररत‍गजतिीलता‍जाकल्पों‍की‍ओर‍बढ़‍रू‍े ू‍ैं क्योंदक‍आुु‍े गजतिीलता‍का‍लचीलापन‍जमलता‍ू‍, और‍ऄपनी‍कार‍का‍जाकल्प‍जमलता‍ू।, ‍मेरज‍नेटाकव‍के‍जास्ट्तार‍ु‍े पूरक‍आन‍ुाझा‍ गजतिीलता‍जाकल्पों‍के‍ईभरन‍े ुे‍धीरे-धीरे‍याजत्रयों‍के‍जनजी‍स्ट्‍ााजमत्‍ा‍ााले‍ााून‍के‍ईपयजग‍ुे‍ुाझा‍या‍ुाावजजनक‍ परराून‍ईन्मुख‍गजतिीलता‍जाकल्पों‍की‍ओर‍पररातवन‍अ‍रूा‍ू।, ददल्ली‍की‍ुाावजजनक‍परराून‍प्रणाली‍कज‍ुंस्ट्थागत‍स्ट्तर, स्ट्थाजनक‍स्ट्तर‍और‍प्रणाली‍स्ट्तर‍पर‍अग‍े एकीकृत‍दकए‍जाने; याजत्रयों‍कज‍एक‍ुुखद‍यात्रा‍का‍ऄनुभा‍प्रदान‍करने‍की‍अाश्यकता‍ू।, ‍एक‍बड़े‍जनादेि, स्ट्थाजनक‍एकीकरण‍(भूजम‍ ईपयजग‍और‍परराून‍एकीकरण, मल्टी‍मजडल‍एकीकरण, ऄंजतम‍छजर‍तक‍कनेजक्टजाटी, अदद)‍के‍मा्‍यम‍ुे‍ुंस्ट्थागत‍ एकीकरण‍कज‍ुमथव‍बनाया‍जा‍ुकता‍ू‍, और‍प्रणाली‍एकीकरण‍(बु‍मागव‍युजि करण, बेूतर‍यातायात‍प्रबंधन‍अदद‍के‍ जलए‍रटकरटग,‍कमांड‍और‍जनयंत्रण‍केंद्र‍ुजूत‍आंटेजलजेंट‍परराून‍प्रणाजलया‍ं अदद)‍की‍िरुु अत‍की‍गइ‍ू,, लेदकन‍आु‍े मजबूत‍दकए‍जाने‍की‍अाश्‍यकता‍ू।, अगामी‍ूाइ‍स्ट्पीड‍रेल‍(एचएुअर)‍कॉररडजर, क्षेत्रीय‍तीव्र‍पारगमन‍प्रणाली‍(अर.अर.टी.एु.), बाइपाु‍/‍पेररफेरल‍ ुड़कों‍अदद‍का‍जनमावण‍क्षेत्रीय‍गजतिीलता‍कज‍पनु भावजीत‍करेगा‍और‍ददल्ल‍ ी‍का‍जाम‍ुमाप्‍त‍ूजगा। आुके‍ऄजतररि , टीओडी‍नीजत‍में‍ददल्ली‍कज‍कायवनीजतक‍क्षत्रे ों‍का‍पुनर्नाकाु‍करने‍और‍नीजतयों‍कज‍मजबूत‍करन‍े और‍ ुाावजजनक‍परराून‍पुएचं ‍में‍ुुधार‍करन‍े के‍एक‍ऄनूठे‍ऄाुर‍की‍व्‍यास्ट्‍था‍ू।, ‍जीएनुीटीडी‍की‍आलेजक्रक‍ााून‍नीजत‍भी‍ ददल्ली‍म‍ें ूररत‍गजतिीलता‍जाकल्पों‍कज‍बढ़ााा‍देने‍और‍काबनव ‍फुटलप्रट‍कज‍कम‍करन‍े की‍ददिा‍में‍ईठाया‍गया‍एक‍कदम‍ ू।, ‍भजाष्य‍में‍गजतिीलता‍रुझान‍जाद्युतीकरण, ुाझा‍गजतिीलता, मांग‍पर‍गजतिीलता‍और‍स्ट्ाायिता‍की‍ओर‍प्राृत्‍त‍ ूोंग;े आुजलए, ददल्ली‍के‍जलए‍मूत्ापूणव‍ूज‍जाता‍ू‍, दक‍ाू‍परराून‍के‍जनमावण‍ुे‍ऄलग‍यात्रा‍की‍मांग‍के‍प्रबंधन‍के‍जलए‍ स्ट्‍ायं‍कज‍त,यार‍करे।‍ददल्ली‍म‍ें ल,ण्ड‍ ‍पूललग‍क्षेत्रों‍ुे‍भी‍आन‍क्षत्रे ों‍में‍अगामी‍बड़े‍पारगमन‍नटे ाकव‍के‍जलए‍ऄंजतम‍छजर‍तक‍ कनेजक्टजाटी‍में‍ुधु ार‍का‍ऄाुर‍प्राप्‍त‍ूजगा। अन‍े ााले‍ाी‍व के‍जलए‍ऄनुमाजनत‍जनुंख्या‍ाृजद्ध‍कज‍्यान‍में‍रखत‍े ुएए, ददल्ली‍में‍1.58‍की‍औुत‍प्रजत‍्जि ‍यात्रा‍दर‍ ुे‍प्रजतददन‍46.2‍जमजलयन‍यात्राएं‍(प,दल‍यात्रा‍कज‍छजड़कर)‍दकए‍जाने‍का‍ऄनुमान‍ू।, ‍यात्राओं‍की‍कुल‍ुंख्या‍का‍ ऄनुमान‍जनम्नजलजखत‍ऄाधारणाओं‍के‍अधार‍पर‍लगाया‍गया‍ू:,  2041‍तक‍50%‍अबादी‍पारगमन‍प्रभाा‍क्षेत्रों‍के‍ऄंदर‍रून‍े लगगे ी।‍आन‍क्षेत्रों‍में‍जमजश्रत-ईपयजग‍जाकाु‍ुे‍यात्रा‍ करन‍े की‍अाश्यकता‍कम‍ूज‍जाएगी‍और‍पारगमन‍मजड‍की‍जनकटता‍ुे‍ुाावजजनक‍परराून‍(पीटी)‍की‍ओर‍एक‍ पररातवन‍करन‍े कज‍प्रजत्ुाून‍जमलेगा।  अने‍ााले‍20‍ाीव‍तक‍जनुंख्या‍का‍बड़ा‍जूस्ट्ुा‍ुेाा‍क्षेत्र‍की‍ओर‍ऄजधक‍ऄंतरण‍न‍कज‍देखते‍ुएए‍घर‍ुे‍काम‍कर‍ रूा‍ूजगा।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 59 2041‍तक, यजजना‍में‍ददल्ली‍के‍80:20‍के‍एक‍मजडल‍जाभाजन‍कज‍प्राप्त‍करने‍की‍पररकल्पना‍की‍गइ‍ू‍, जज‍जनता‍और‍ ुाझा‍परराून‍के‍पक्ष‍म‍ें ू।, ‍आुमें‍प्रजताी‍व ुाावजजनक‍और‍ुाझे‍परराून‍ुाधनों‍म‍ें 1%‍ाृजद्ध‍तथा‍जनजी‍ााून‍ररपों‍म‍ें एक‍ुमान‍कमी‍की‍अाश्यकता‍ूजगी। आु‍खंड‍म,ें ‍ुमग्र‍रूप‍ुे‍परराून‍प्रणाली‍की‍दक्षता‍में‍ुुधार‍करने‍के‍जलए‍ुमजन्ात‍जनयजजन‍और‍गजतिीलता‍पूल‍के‍ जनष्पादन‍की‍रूपरेखा‍ााले‍जनम्नजलजखत‍ऄ्याय‍िाजमल‍ू।ैं ‍आुमें‍क्षेत्रीय‍और‍स्ट्थानीय‍कनेजक्टजाटी‍और‍परराून‍ ऄाुंरचना‍ुुधारन,े ‍ुाझा‍मजड‍के‍पक्ष‍म‍ें ुमथवकारी‍मजडल‍पररातनव ,‍पदयात्रा‍और‍ुाआदकल‍चलान‍े की‍ुुजाधाओं‍कज‍ बेूतर‍करन,े ‍पार्ककग‍की‍अाश्य‍ कताओं‍का‍आष्ट‍तम‍ईपयजग‍करने‍और‍बेूतर‍पार्ककग‍प्रबंधन‍कज‍ुुकर‍बनाने‍की‍जाजभन्‍न‍ कायवनीजतयां‍दी‍गइ‍ू:ैं MOB‍1:‍कनजे क्टजाटी‍और‍परराून‍ऄाुरं चना‍(राुं पजटव‍आन्फ्रास्ट्रक्चर)‍म‍ेंुधु ार MOB‍2:‍जनजी‍ु‍ेुाझा‍गजतिीलता‍म‍ेंस्ट्थानातं रण MOB‍3:‍ददल्ली‍कज‍पद, ल‍चलन‍ेयजग्य‍और‍ुाआदकल‍चलान‍ेके‍ऄनकु ूल‍बनाना MOB‍4:‍ददल्ली‍म‍ेंपार्ककग‍का‍प्रबधं न60 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 9.0 ‍कनजे क्टजाटी‍और‍परराून‍ऄाुरं चना‍म‍ेंुधु ार ऄ्याय कजड MOB 1 9.1.1 ददल्ली‍के‍गजतिीलता‍नेटाकव‍म‍ें जनरंतर‍जाकाु‍और‍अुपाु‍के‍िूरी‍केंद्रों‍तथा‍ अगामी‍क्षेत्रीय‍परराून‍और‍क्षेत्रीय‍ऄाुंरचना‍में‍नए‍जाकाु‍के‍जलए‍प्रजतदक्रया‍देन‍े की‍अाश्यकता‍ू‍, जजुुे‍िूर‍के‍याजत्रयों‍और‍माल‍की‍अााजाूी‍का‍प,टनव‍प्रभाजात‍ूजता‍ू।, ‍िूर‍कज‍ना‍ िूरीकृत‍क्षेत्रों‍में‍पुएचं ‍प्रदान‍करने‍के‍जलए‍अतं ररक‍चुनौजतयों,‍भीड़भाड़‍कम‍करन,े ऄल्प‍ -ईपयजगी‍परराून‍ ऄाुंरचना‍कज‍पुनजीजात‍करने,‍पदयात्रा‍एां‍ुाआदकल‍चलाने‍अदद‍पता‍लगाने‍की‍अाश्य‍ कता‍ू।, ‍मूत्ापूणव‍ बात‍यू‍ू‍, दक‍भजाष्य‍में‍गजतिीलता‍के‍रुझानों‍में‍स्ट्ाच्छ‍ईंधन‍का‍ऄजधक‍ईपयजग‍करना,‍यातायात‍और‍पार्ककग‍ प्रबंधन‍के‍जलए‍तकनीकी‍रूप‍ुे‍ईन्नत‍पारगमन‍प्रणाली‍और‍कृजत्रम‍बुजद्ध‍की‍जािेीता‍ूजगी।‍िूर‍में‍ऐु‍े पररातवनकारी‍पररातवन‍करन‍े और‍कुिल‍एां‍रटकाउ‍गजतिीलता‍ुमाधानों‍के‍जलए‍त,यारी‍करने‍की‍अाश्यकता‍ ू।, 9.1.2 आु‍ऄ्याय‍में‍प्रस्ट्तुत‍क्षेत्रीय‍और‍िूर‍स्ट्तरीय‍कायवनीजतयों‍में‍जनम्नजलजखत‍की‍पररकल्पना‍की‍गइ‍ू:, i) ऄंतर-िूर‍और‍ऄंतरा-िूर‍यात्री‍और‍माल‍ढुलाइ‍अााजाूी‍में‍ाृजद्ध। ii) परराून‍के‍ुाथ‍जुड़ी‍भूजम‍ुंपजि‍का‍बेूतर‍ईपयजग। iii) स्ट्माटव‍और‍ूररत‍गजतिीलता‍ुमाधान‍की‍ओर‍पयावप्‍त‍प्रााु 9.2 क्षत्रे ीय‍कनजे क्टजाटी‍म‍ेंुधु ार 9.2.1 रेल:‍रेला,े ‍पांच‍प्रमुख‍रेला‍े स्ट्टेिनों‍नामत: नइ‍ददल्ली, पुरानी‍ददल्ली, ूजरत‍जनजामुद्दीन, अनंद‍जाूार‍ टर्नमनल‍और‍ददल्ली‍ुराय‍रजजूल्ला‍के‍मा्यम‍ुे‍ददल्ली‍कज‍देि‍के‍बाकी‍जूस्ट्ुों‍ुे‍जजड़ता‍ू।, ‍मौजूदा‍रेला‍े स्ट्टेिनों‍के‍स्ट्टेिन‍पुनर्नाकाु‍ुे‍स्ट्टेिन‍क्षेत्रों‍के‍अुपाु‍बुए-जाजधक‍यातायात‍प्रााू‍और‍यात्री‍अााजाूी‍ में‍ुुधार‍ूजगा।‍रेलाे‍स्ट्टेिनों‍और‍ुमीपाती‍अइएुबीटी, बु‍टर्नमनलों, मेरज‍या‍अरअरटीएु‍स्ट्टेिनों‍ अदद‍के‍बीच‍बुए-जाध‍पारगमन‍केंद्र‍के‍रूप‍में‍ऄंत:‍पररातवन‍ुुजाधाओं‍का‍जाकाु‍दकया‍जाएगा।‍आन‍ टर्नमनलों‍पर‍बेूतर‍पारगमन‍और‍यात्री‍ुुजाधाएं‍प्रदान‍करने‍के‍जलए‍पूचान‍दकए‍गए‍स्ट्थलों‍के‍जलए‍ पारगमन-ईन्मुख‍जाकाु‍के‍ओार‍स्ट्टेिन‍जाकाु‍जनयंत्रणों‍की‍ऄनुमजत‍दी‍जा‍रूी‍ू।, ‍(देख:ें‍DEV3) 9.2.2 ूााइ‍ऄड्डा:‍आंददरा‍गांधी‍ऄंतरावष्ट्रीय‍ूााइ‍ऄड्डे‍और‍पालम‍ूााइ‍ऄड्ड‍े द्वारा‍ऄतं रावष्ट्रीय‍और‍घरेल‍ू ूााइ‍ यात्री‍अाागमन‍की‍जरूरत‍ें परू ी‍ूजती‍ू।ैं ‍आु‍ूााइ‍ऄड्डे‍ु‍े ाार्नीक‍67.3‍जमजलयन‍यात्री‍ुफर‍करत‍े ू।ैं ‍ जेार‍म‍ें ऄतं रावष्ट्रीय‍ूााइ‍ऄड्डे‍की‍िुरुअत‍के‍ुाथ, यू‍ऄनमु ान‍लगाया‍जा‍ुकता‍ू‍, दक‍कुछ‍यात्री‍और‍ माल‍यातायात‍कज‍अइजीअइ‍ूााइ‍ऄड्डे‍ु‍े ईु‍ूााइ‍ऄड्ड‍े की‍ओर‍मजड़‍ददया‍जाएगा।‍आन‍दज‍ूााइऄड्डों,‍ ददल्‍ली‍और‍जेार‍म‍ें नए‍ूााइ‍ऄड्ड‍े के‍बीच‍कनेजक्टजाटी‍कज‍ुड़क‍अधाररत‍और‍मेरज‍अधाररत‍कनेजक्टजाटी‍ के‍मा्यम‍ुे‍मजबूत‍दकए‍जान‍े की‍अाश्‍यकता‍ू।, 9.2.3 माु‍र,जपड‍रेलः‍एनुीअर‍िूरों‍की‍कनेजक्टजाटी‍कज‍और‍ऄजधक‍बेूतर‍बनाने‍के‍जलए‍ददल्ली‍मेरज‍के‍ कायवनीजतक‍ कॉररडजर‍ बनाए‍जाए।‍ क्षेत्रीय‍ र,जपड‍ रांजजट‍ जुस्ट्टम‍ (अरअरटीएु)‍ और‍ूाइ‍ स्ट्पीड‍ रेल‍ कॉररडजर‍िूर‍म‍ें जाजभन्न‍प्राेि‍लबदओंु ‍कज‍कम‍करने‍म‍ें एक‍प्रमुख‍भूजमका‍जनभाएगा‍और‍अर्नथक‍ गजतजाजधयों, अााु‍और‍ऄन्य‍ुेााओं‍के‍जलए‍ददल्ली‍और‍अुपाु‍के‍क्षेत्र‍के‍बीच‍मजबतू ‍आंटरललक्ु‍कज‍ ुुदढ़ृ ‍करेगा।‍ददल्ली‍के‍ऄंदर‍अरअरटीएु‍स्ट्टेिन‍मौजूदा‍रेला‍े टर्नमनलों‍/‍स्ट्टेिनों, मेरज‍स्ट्टेिनों‍और‍ अइएुबीटी‍की‍जनकटता‍में‍जस्ट्थत‍ू‍ैंऔर‍याजत्रयों‍की‍जनबावध‍यात्रा‍के‍जलए‍ुीधे‍आंटरचेंज‍ुुजाधाएं‍ू।ैं ‍जूााँ‍ भी‍ुंभा‍ूज‍ऐुे‍स्ट्टेिनों‍कज‍मल्टी-मजडल‍रांजजट‍ूब‍के‍रूप‍में‍ऄन्य‍स्ट्थानीय‍माु‍रांजजट‍स्ट्टेिनों‍के‍ुाथ‍ एकीकृत‍दकया‍जाना‍ू।, (देख:ें‍MOB‍2)[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 61 ऄतं राज्व य‍ ीय‍बु‍टर्नमनल‍(अइएुबीटी) िूर‍के‍मूत्ापणू व‍क्षेत्रीय‍कनेजक्टजाटी‍केंद्रों‍का‍कायव‍करते‍ू।ैं ‍आन‍ नजड्ु‍कज‍जूां‍भी‍ुंभा‍ूज,‍ऄन्य‍पारगमन‍स्ट्टेिनों‍ज,ुेदक‍बुएजाध‍पारगमन‍केंद्र‍ााली‍ऄंत:पररातवन‍ ुुजाधाएं‍ुृजजत‍कर‍बेूतर‍बनाने‍की‍जरूरत‍ू।, ‍(देख:ें‍MOB‍2)।‍अइएुबीटी‍के‍भजाष्य‍के‍ुभी‍प्रस्ट्तााों‍ कज‍ऄजधमानतः‍राष्ट्रीय‍राजमागों‍पर‍िूर‍के‍ुबुे‍मूत्ापूण‍व लबदओंु ‍पर‍ऄाजस्ट्थत‍दकया‍जाएगा‍जूां‍िूर‍ के‍बाकी‍जूस्ट्ुों‍के‍ुाथ‍मजबूत‍मल्टी-मजडल‍कनेजक्टजाटी‍ूजगी। 9.3 एकीकृत‍गजतिीलता‍प्रबधं न‍के‍जलए‍ुस्ट्ं थागत‍रुपरेखा 9.3.1 एक‍कुिल‍िूरी‍परराून‍प्रणाली‍के‍जलए‍ुभी‍जनयजजन‍स्ट्‍तरों,‍कायावन्ायन‍और‍िूर‍और‍क्षेत्रीय‍स्ट्तर‍के‍ ददन-प्रजतददन‍के‍ुंचालन‍पर‍ईच्‍च‍स्ट्त‍ रीय‍ुमन्ायन‍ऄपेजक्षत‍ू।, ‍जपछली‍यजजना‍म‍ें आु‍ईद्देश्य‍के‍जलए‍ एकीकृत‍मूानगरीय‍परराून‍प्राजधकरण‍(यएू मटीए) की‍स्ट्थापना‍की‍जुफाररि‍की‍गइ‍थी।‍आु‍यजजना‍म‍ें आु‍प्रस्ट्ताा‍का‍ुमथवन‍दकया‍गया‍ू‍, और‍यू‍भी‍जुफाररि‍की‍गइ‍ू‍, दक‍ऐुे‍प्राजधकरण‍के‍जनमावण‍की‍ ुंभााना‍की‍ुमयबद्ध‍तरीके‍ुे‍जांच‍की‍जानी‍चाजूए। 9.3.2 ऐुे‍ुमय‍तक‍जब‍तक‍यूएमटीए‍का‍गठन‍नूीं‍दकया‍जाता‍ू,, जीएनुीटीडी‍के‍तूत‍एक‍ऄतं ररम‍ुमन्ाय‍ ुजमजत‍की‍स्ट्थापना‍की‍जाएगी‍जजुमें‍ुभी‍परराून‍एजेंजुयों /‍जाभागों, यातायात‍पुजलु‍और‍स्ट्थानीय‍ जनकायों‍का‍प्रजतजनजधत्ा‍ूज।‍यूटीटीअइपीइुी‍(यूटीप,क)‍आु‍ुजमजत‍कज‍तकनीकी‍ुूायता‍प्रदान‍करेगा। 9.3.3 यूएमटीए/ुमन्ाय‍ुजमजत, 'व्‍यापक‍एप्रजच' ुुजनजित‍करती‍ू‍, और‍आुने‍गजतिीलता‍प्रबंधन‍के‍प्रजत‍ 'ाृजद्धिील‍दजृ ष्टकजण'‍ऄपनाया‍ू‍, एा‍ं बुए-एजेंुी‍प्राथजमकताओं‍और‍जनाेिों‍पर‍फजकु‍दकया‍ू।, ‍आुम‍ें ुंयुि ‍ कायवााूी‍के‍जलए‍एक‍ुामान्य‍जनजध‍और‍प्ल,टफामव‍बनाना‍िाजमल‍ूजगा। 9.3.4 यूटीएमए/ ुमन्ाय‍ुजमजत,‍्ापक‍गजतिीलता‍यजजना‍(ुीएमपी) कज‍िुरू‍करन‍े और‍कायावजन्ात‍करने,‍ जाजभन्न‍एजेंजुयों‍की‍पररयजजनाओं‍और‍कायों‍के‍ुमन्ाय‍और‍स्ट्माटव‍ुमाधान‍ऄपनान‍े के‍जलए‍जाजभन्न‍बुए- एजेंुी‍पररयजजनाओं‍कज‍लाग‍ूकरने‍के‍जलए‍ईत्‍तरदायी‍ूजगी। 9.4 व्य‍ ापक‍गजतिीलता‍यजजना 9.4.1 िूरी‍ परराून‍ की‍ दक्षता‍ जाजभन्न‍ ुड़क-अधाररत, रेल-अधाररत, म्याती‍ ुाावजजनक‍ परराून‍ (अइपीटी)‍और‍पदयात्रा/‍ुाआदकल‍चालन‍प्रणाजलयों‍के‍बीच‍ुूज‍एकीकरण‍पर‍ऄत्य‍ जधक‍जनभवर‍ू।, ‍िूरी‍ परराून‍के‍ुभी‍स्ट्तरों‍और‍तरीकों‍में‍प्रणालीगत‍एकीकरण‍प्राप्त‍‍करने‍ूते ु‍ददल्ल‍ ी‍के‍जलए‍एक‍्ापक‍ गजतिीलता‍यजजना‍(ुीएमपी)‍त,यार‍की‍जाएगी।‍ुीएमपी‍कज‍एमपीडी‍2041‍के‍प्रााधानों‍के‍ऄनुुार‍ बनाया‍जाएगा‍और‍आुमें‍‘कम‍काबवन‍गजतिीलता‍की‍ओर‍पररातवन’‍के‍रूपांतरकारी‍लक्ष्य‍ ‍कज‍प्राप्त‍करने‍के‍ जलए‍जास्ट्तृत‍रूपरेखा‍दी‍जाएगी। 9.5 कायनव ीजतक‍परराून‍कॉररडजर 9.5.1 मूत्‍ापमणव‍क्षेत्रीय‍गतं ्ों‍कज/ुे‍ईच्च‍गजत‍की‍कनेजक्टजाटी‍कज‍बेूतर‍और‍िूर‍के‍ऄदं र‍जाम‍(जािेी‍रूप‍ु‍े क्षेत्रीय‍यातायात‍के‍कारण)‍कम‍करने‍के‍जलए,‍आु‍यजजना‍ऄाजध‍में‍कायावजन्ात‍दकए‍जाने‍के‍जलए‍62 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] जनम्न‍ जलजखत‍कायवनीजतक‍परराून‍कॉररडजर‍की‍पूचान‍की‍गइ‍थी।‍ये‍कॉररडजर‍मौजूदा/प्रस्ट्ताजात‍प्रमुख‍ ुड़क‍एलाआनमेंट‍के‍कायवनीजतक‍ललक‍या‍ईनका‍जास्ट्तार‍ूोंगे‍ज,ुा‍दक‍नीचे‍ददया‍गया‍ू:ैं ताजलका‍9.0: कायनव ीजतक‍ललक‍और‍ईनके‍लाभ प्रस्ट्त‍ ाजात‍ललक लाभ कायनव ीजतक‍ललक‍1 o िूरी‍माल‍यातायात‍पद, ा‍करने‍ााल‍ेस्ट्थानों‍कज‍जजड़कर‍माल‍की‍ अााजाूी‍कज‍ुुकर‍बनाना,‍जज‍यूइअर II (नरेला, बूादरु गढ़‍ यूइअर II‍का‍ईत्‍तरी‍जास्ट्‍तार‍ अइएफुी, नरेला‍अइएफुी, बूादरु गढ़‍और‍कंझाााला‍(प्रस्ट्ताजात), (रटकरी‍कला‍ं बॉडवर‍-‍रजजूणी‍-‍ बााना‍औद्यजजगक‍क्षेत्र‍और‍डीएुअइडीुी‍नरेला‍में‍औद्यजजगक‍बेल्ट)‍ बााना‍-‍नरेला‍-‍रमजानपरु ), के‍ुजन्नकट‍ू‍ैंऔर‍ुाथ‍ूी‍लजनी‍अइुीडी, लूडन‍एयरपजटव‍और‍दादरी‍ गाजजयाबाद‍म‍ें लजनी-बागपत‍ एक्ुप्रेुाे‍तक‍जास्ट्ताररत अइुीडी ज,ुी‍ुमान‍रांु-ररार‍ुुजाधाएं। o ददल्ली‍(नरेला, रजजूणी, अदद)‍और‍गाजजयाबाद‍(रजजनका‍जुटी‍और‍ राजनगर)‍में‍अााुीय‍क्षेत्रों‍के‍बीच‍रजजगार‍केंद्रों‍(ददल्ली‍और‍राष्ट्रीय‍ राजधानी‍क्षेत्र‍म‍ेंऔद्यजजगक‍क्षत्रे )‍के‍बीच‍कनेजक्टजाटी‍स्ट्थाजपत‍करना।‍ गाजजयाबाद‍में‍अााुीय‍क्षेत्रों‍में‍बेूतर‍पुएचं ‍ददल्ली‍में‍ुस्ट्त‍ े‍अााु‍ की‍मांग‍परू ी‍करेगी। o ुजनीपत‍कज‍गाजजयाबाद‍(ुजनीपत‍-‍नरेला‍-‍कुंडली-ऄलीपुर-लजनी- िाूदरा)‍ु‍ेजजड़न‍े के‍जलए‍ा,कजल्पक‍माग‍वप्रदान‍करके‍एनएच-1 (जीटी‍रजड), अईटर‍ररग‍रजड, जुग्नेचर‍जब्रज‍और‍ाज़ीराबाद‍जब्रज‍कज‍ जामरजूत‍करना। कायनव ीजतक‍ललक‍ 2 o कन्ाेंिन‍ुेंटर‍द्वारका‍कज‍‍अइजीअइ‍के‍कागो‍ूडैं ललग‍टर्नमनल, और‍ ईुके‍बाद‍तुगलकाबाद‍माल‍टर्नमनल‍और‍रेलाे‍स्ट्टेिन‍ुे‍जजड़कर‍ यूइअर II‍का‍दजक्षणी‍जास्ट्‍तार ददल्ली‍म‍ेंमाल‍ढुलाइ‍कज‍अुान‍बनाना।‍आु‍मागव‍कज‍नजएडा‍(दादरी‍ (द्वारका‍ुे‍तगु लकाबाद तक),‍ अइएफुी, नजएडा एुइज,ड‍और‍ग्रेटर‍नजएडा‍और‍यमुना‍एक्ुप्रेुाे‍के‍ नजएडा-ग्रेटर‍नजएडा‍एक्‍ुप्रेुा‍े औद्यजजगक‍क्षेत्रों)‍में‍ुमान‍ुुजाधाओं‍ुे‍जजड़न‍े के‍जलए‍‍आुका‍जास्ट्‍तार‍ तक‍जास्ट्‍तररत‍(स्ट्थल‍ दकया‍‍जा‍ुकता‍ू।, व्‍याूायवता‍के‍ऄनुुार) o अइजीअइ‍ूााइ‍ऄड्डे‍की‍जेार‍/‍नजएडा‍ऄंतरावष्ट्रीय‍ूााइ‍ऄड्ड‍ेतक‍ ुीधी‍कनेजक्टजाटी‍स्ट्थाजपत‍करना o ग्रेटर‍नजएडा‍कज‍अइजीअइ‍एयरपजटव‍ुे‍जजडने‍के‍जलए‍‍ा,कजल्पक‍मागव‍ (ग्रेटर‍नजएडा-नजएडा-अइजीअइ‍एयरपजटव)‍प्रदान‍करके‍और‍ फरीदाबाद‍ुे‍ददल्ली‍जाने‍ााल‍ेयातायात‍कज‍मजड़कर‍एनएच-2, काललदी‍कुंज‍जब्रज‍और‍डीएनडी‍फ्लाइओार‍के‍जाम‍कज‍कम‍करना। कायनव ीजतक‍ललक‍3 o ददल्ली‍के‍ुाथ‍गुरुग्राम‍के‍औद्यजजगक‍क्षेत्रों‍और‍अगामी‍बूादरु गढ़‍ औद्यजजगक‍क्षेत्र‍के‍बीच‍कनेजक्टजाटी‍स्ट्थाजपत‍करना। बूादरु गढ़‍ु‍ेजबजााुन‍तक o द्वारका‍ुेक्टर-22‍मेरज‍स्ट्टेिन‍पर‍आंटरचेंज‍के‍मा्यम‍ु‍ेबूादरु गढ़‍और‍ (टीकरी‍बॉडवर‍मेरज‍स्ट्टेिन‍-‍ झड़ौदा‍कलां‍-‍डाुना‍बु‍स्ट्टैंड‍ गुरुग्राम‍ुे‍अइजीअइ‍ूााइ‍ऄड्डे‍के‍जलए‍कनेजक्टजाटी‍स्ट्थाजपत‍करना। मेरज‍स्ट्टेिन‍-‍नजफगढ़‍-‍ o ददल्ली‍के‍दजक्षण-पजिम‍भाग‍और‍गरुु ग्राम‍ुेक्टर‍-18 (ईद्यजग‍जाूार)‍ छााला‍-‍द्वारका‍ुेक्टर‍-22‍ में‍प्रस्ट्ताजात‍अरअरटीएु‍स्ट्टेिन‍के‍बीच‍कनेजक्टजाटी‍स्ट्थाजपत‍करना। मेरज‍स्ट्टेिन‍-‍जबजााुन‍रेला‍े o द्वारका‍ुे‍जबजााुन‍रेला‍ेस्ट्टेिन, लैंड‍पूललग‍ज़जन‍और‍गरुु ग्राम‍तक‍ स्ट्टेिन), ढुंढेरा‍और‍गुरुग्राम‍ पुएचाँ ‍में‍ुुधार ुेक्टर‍-18‍(ईद्यजग‍जाूार)‍के‍ मा्यम‍ु‍े ुएडा‍जुटी‍ुेंटर‍मेरज‍ स्ट्टेिन‍तक‍जास्ट्ताररत[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 63 9.5.2 ये‍ललक‍पड़जुी‍राज्यों‍के‍ऄजधकार‍क्षेत्र‍म‍ें अन‍े ााल‍े एलाआनमेंटु‍/‍स्ट्‍रेच‍जाकजुत‍करने‍के‍जलए‍ऄंतर- राज्यीय‍ुमन्ाय‍पर‍जनभवर‍करते‍ू‍ैं और‍आन्ू‍ें प्राथजमकता‍कॉररडजर‍पररयजजना‍की‍तरू‍माना‍जाएगा‍और‍ पूणव‍ललक‍का‍जाकाु‍ऄंतर-राज्य‍ुमझौतों‍के‍मा्यम‍ु‍ेदकया‍जाएगा। 9.5.3 आु‍ कायवनीजतक‍ ललक‍ का‍ जाकाु‍ याजत्रयों‍ और‍ माल‍ की‍अााजाूी‍ की‍ ुुजाधा‍ के‍ जलए‍ पारगमन-‍ प्राथजमकता‍कॉररडजर‍के‍रूप‍म‍ेंदकया‍जाएगा। 9.5.4 िूर‍ुे‍अाागमन‍कज‍ुुगम‍बनाने‍ााल‍े दकुी‍भी‍नये‍ुड़क-अधाररत‍ऐुे‍रांु-जुटी‍कनेक्टर‍कज‍ ूतजत्‍ुाजूत‍दकया‍जाएगा‍जज‍पूाी‍और‍पजिमी‍पेररफेरल‍एक्ुप्रेुाे‍के‍ईपयजग‍के‍जलए‍गर, -प्रजत्‍ुाूक‍ूजते‍ ू‍ैं और‍आुुे‍िूर‍के‍ऄंदर‍जाम‍ूजगा।‍ईच्च‍गजत‍रांु-जुटी‍कॉररडजर‍कज‍व्‍याूायवता‍के‍ऄनुुार‍जाकजुत‍ करने‍के‍जलए‍बड़े‍प,माने‍पर‍पारगमन‍प्रणाली‍की‍ऄनुमजत‍दी‍जाएगी। 9.6 ऄतं ः‍िूर‍(आंरा-जुटी)‍रजड‍नटे ाकव‍का‍जाकाु‍और‍ुधु ार 9.6.1 ददल्ली‍कज‍ऄनुक्रम‍ुड़क‍नेटाकव‍ुे‍एक‍ररग-रेजडयल‍प,टनव‍पर‍जनयजजजत‍दकया‍गया‍ू।, ‍मजटे‍तौर‍पर, ुड़क‍ नेटाकव‍कज‍क्षेत्रीय, आंरा-जुटी‍और‍स्ट्थानीय‍यातायात‍के‍जलए‍जडज़ाआन‍दकया‍गया‍ू।, ‍जनम्नजलजखत‍ऄनुक्रम‍ ुड़कों‍का‍ऄनुुरण‍दकया‍जाएगा: i) राष्ट्रीय‍राजमाग‍व (60-90‍मीटर‍अरओडब्ल्‍‍य)ू : भारतीय‍राष्ट्रीय‍राजमाग‍व प्राजधकरण‍(एनएचएअइ) कज‍ददल्ली‍ुे‍गुजरन‍े ााल‍े राष्ट्रीय‍राजमागों‍के‍जाकाु‍, चौड़ीकरण,‍ुुधार‍करत‍े ुमय‍स्ट्रीट‍ जडज़ाआन‍जाजनयम‍(देख:ें ऄनलु ग्नक‍7)‍कज‍िाजमल‍करना‍चाजूए।‍िूर‍के‍ऄंदर‍के‍ुभी‍राष्ट्रीय‍ राजमागव‍ददल्ली‍बॉडरव ‍तक‍जनयंजत्रत‍ूोंगे‍और‍िूर‍की‍ुड़कों‍के‍जडजाआन‍जाजनयमों‍का‍पालन‍ करेंगी। ii) मख्ु य‍ ‍ुड़कें‍[30-60‍मीटर‍मागावजधकार‍(अर.ओ.डब्ल्यू)]:‍मख्ु ‍य‍ुड़कों‍ु‍े िूर‍कज‍लंबी‍दरू ी‍की‍ गजतिीलता‍जमलती‍ू‍, जजुुे‍िूर‍के‍जूस्ट्ु‍ ‍े एक‍-दुू रे‍ुे‍जडु त‍े ू,ैं‍ुभी‍प्रकार‍का‍भारी‍यातायात‍ ुंचाजलत‍ूजता‍ू।, ‍24‍मी.‍ुे‍ऄजधक‍मागावजधकार‍(अरओडब्ल्‍‍यू)‍ााली‍मौजूदा‍ुड़कें,‍जज‍जमीन‍पर‍ मुख्य‍ ‍ुड़कों‍का‍कायव‍कर‍रूी‍ूैं, अााजाूी‍बढ़ाने‍के‍जलए‍ईन्ू‍ेंअाश्यक‍ुुधारों‍के‍ुाथ‍जारी‍रखा‍ जा‍ुकता‍ू।, iii) कलक्े टर‍ुड़कें‍(12-30‍मीटर‍अरओडब्ल्‍‍य)ू :‍कलेक्टर‍ुड़कों‍ुे‍स्ट्थानीय‍क्षेत्रों‍के‍बीच‍ुंपकव‍प्राप्‍त‍ ूजता‍ू‍, और‍ये‍स्ट्थानीय‍ुड़कों‍कज‍मुख्य‍ ‍ुड़कों‍ुे‍जजड़ती‍ू।ैं ‍ाास्ट्‍ता‍में‍कलेक्ट‍र‍ुड़कों‍का‍काम‍ करने‍ााली‍12‍मीटर‍ुे‍कम‍अरओडब्‍ल्‍य‍ू ााली‍ातवमान‍ुड़कों‍कज‍अाागमन‍में‍ाृजद्ध‍के‍जलए‍ अाश्यक‍ुुधार‍के‍ुाथ‍जारी‍रखा‍जा‍ुकता‍ू।, iv) स्ट्थानीय‍ुड़कें‍(अरओडब्‍ल्‍य ू <12‍मी.): ये‍12‍मी.‍या‍ईुुे‍कम‍के‍अरओडब्ल्‍‍यू‍ााली‍स्ट्थानीय‍ ईपयजग‍के‍जलए‍ाांजछत‍ुड़कें‍ूजती‍ू।ैं ‍ऐुी‍ुड़कों‍कज‍धीमी‍गजत‍ुे‍चलने‍ााले‍र,दफक‍(र,दफक‍कज‍ धीमा‍करने‍के‍ईपायों‍ुे), प,दल‍यात्री‍या‍एनएमटी प्राथजमकता‍ााली‍ुड़कों‍के‍जमश्रण‍के‍रूप‍में‍या‍ पूरी‍तरू‍ुे‍प,दल‍याजत्रयों‍के‍जलए‍जडज़ाआन‍दकया‍जा‍ुकता‍ू।, 9.6.2 ुभी‍नइ‍ुड़कों‍कज‍स्ट्रीट‍जडजाआन‍जाजनयम‍(देख:ें ‍ऄनुलग्नक‍7)‍के‍ऄनुुार‍जाकजुत‍दकया‍जाएगा।‍जूां‍ तक‍ुंभा‍ूज, जाजनयमों‍में‍दी‍गइ‍अाश्यकताओं‍कज‍परू ा‍करन‍े के‍जलए‍मौजूदा‍ुड़कों‍कज‍भी‍बेूतर‍ बनाया‍जाएगा।64 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 9.6.3 ुभी‍श्रेजणयों‍की‍ुड़कों‍कज‍मख्ु य‍यजजना‍म‍ें प्रस्ट्ताजात‍पणू व‍क्रॉु-ुेक्िन‍या‍ऄनुमजददत‍लअे ईट‍प्लान‍के‍ जूस्ट्ुे‍के‍रूप‍में‍जाकजुत‍दकया‍जाएगा। i) जूां‍भी‍ुंभा‍ूज, कलेक्टर‍और‍स्ट्थानीय‍ुड़कों‍ुे‍ुभी‍बाधाओं‍कज‍ूटाया‍जाएगा‍और‍मानकों‍ तथा‍स्ट्रीट‍जडजाआन‍जाजनयमों‍के‍ऄनुुार‍जाकजुत‍दकया‍जाएगा। ii) ुड़क‍पार्ककग‍द्वारा‍प,दल‍रास्ट्त‍ े‍का‍ऄजतक्रमण‍कम‍करने‍और‍ुड़क‍क्षमता‍का‍प्रभााी‍ईपयजग‍ ुुजनजित‍करन‍े के‍जलए‍क्षेत्र‍स्ट्तरीय‍पार्ककग‍प्रबंधन‍(देख:ें‍MOB4)‍कज‍्‍यान‍में‍रखा‍जाएगा। 9.6.4 ुभी‍नइ‍मुख्य‍ ‍ुड़कों‍(एनएच, यूइअर, अदद‍ुजूत)‍में‍अरओडब्ल्‍‍यू‍के‍भाग‍के‍रूप‍म‍ें मल्टी-मजडल‍ईच्च‍ क्षमता‍ााली‍ुााजव जनक‍परराून‍प्रणाजलयों‍के‍जलए‍स्ट्थ‍ ान‍िाजमल‍ूोंग।े ‍राजं जट‍स्ट्टेिनों‍की‍ऄजधक‍ुख्ं य‍ ा‍ कज‍िाजमल‍करने‍के‍जलए‍प्ल‍ ाजा‍और‍खुल‍े स्ट्‍थानों‍कज‍िाजमल‍दकया‍जाएगा।‍जूााँ‍्ाूायव‍ूजगा‍ाूा‍ाँ मौजूदा‍और‍नए‍ुड़क‍मागों‍म‍ें मागावजधकार‍में‍जाजभन्न‍ुेााओं‍के‍जलए‍ईपयजजगता‍नाजलयों‍के‍प्रााधान‍के‍ जलए‍स्ट्थान‍रखा‍जाएगा। 9.6.5 ददल्‍ली‍में‍िूरी‍ुड़कों‍की‍ुड़क‍ुुरक्षा‍ऑजडट,‍ुड़क‍परराून‍और‍राजमाग‍व मंत्रालय‍के‍जाज़न‍के‍ ऄनुरूप‍ूजनी‍चाजूए‍तादक‍प,दल‍याजत्रयों‍और‍ुाआदकल‍चालकों‍के‍जलए‍एक‍ुुरजक्षत‍यात्रा‍ााताारण‍का‍ ुृजन‍ूज।‍आु‍लक्ष्य‍कज‍प्राप्त‍करने‍के‍जलए‍कायवनीजतयां‍जास्ट्ततृ ‍रूप‍ुे‍MOB3‍में‍दी‍गइ‍ू।ैं 9.7 िूर-स्ट्तरीय‍ुााजव जनक‍परराून‍प्रणाजलयों‍का‍ुां द्धनव 9.7.1 नेटाकव‍एकीकरण,‍ददल्ली‍के‍जलए‍एक‍स्ट्थायी‍और‍अाश्यकता-ऄनरूु प‍ुाावजजनक‍परराून‍प्रणाली‍ जाकजुत‍करने‍की‍कुंजी‍ूजगी।‍ुभी‍ुाावजजनक‍परराून‍मजड‍के‍नेटाकव‍की‍यजजना‍आु‍प्रकार‍बनाइ‍ जाएगी‍तादक‍ाे‍एक‍परू क‍तरीके‍म‍ें परराून‍ुेााएं‍प्रदान‍करन‍े के‍जलए‍ुामंजस्ट्यपूण‍व तरीके‍ु‍े एक‍एकल‍ प्रणाली‍के‍रूप‍में‍ुंचालन‍करें।‍ुीएमपी‍के‍तूत‍एकीकृत‍नेटाकव‍जनयजजन‍और‍रूट‍युजि करण‍की‍यजजना‍ बनाइ‍जानी‍चाजूए‍और‍ुंबंजधत‍एजेंजुयों‍द्वारा‍ुमजन्ात‍तरीके‍ुे‍कायावजन्ात‍की‍जाएंगी।‍पदयात्रा,‍ ुाआदकल‍ चलान‍े और‍ मांग-अधाररत‍ रटकाउ‍ ुाझा‍ परराून‍ मजड‍ (इ-ररक्िा, ऑटज-ररक्िा, ट,क्ुी, ुाआदकल-ररक्िा, अदद)‍के‍मा्यम‍ु‍े ुबुे‍ुमीपस्ट्‍थ‍और‍ऄंजतम-छजर‍तक‍कनेजक्टजाटी‍कज‍प्रजत्ुाजूत‍ दकया‍जाएगा। 9.7.2 मरे ज, अरअरटीएु‍और‍ऄन्य‍माु‍र,जपड‍राजं जट‍जुस्ट्टम:‍माु‍र,जपड‍रांजजट‍जुस्ट्टम‍(एमअरटीएु)‍कज‍ 5,000‍ु‍े ऄजधक‍व्‍यजि ‍पीक‍ऑार‍पीक‍डायरेक्िन‍र,दफक‍(पीएचपीडीटी)‍की‍क्षमता‍ााली‍ुमर्नपत‍ ऄजधकृत‍मागव‍ााली‍दकुी‍भी‍प्रणाली‍के‍रूप‍में‍पररभाजीत‍दकया‍जाएगा। 9.7.3 बु‍प्रणाली‍द्वारा‍ुमर्नथत‍ददल्ली‍मेरज‍प्रमुख‍एमअरटीएु‍बनाएगी।‍अगामी‍अरअरटीएु‍नेटाकव‍ऄतं ः‍ िूर‍यात्राओं‍म‍ें भी‍ुूायक‍ूजगा।‍यू‍अिा‍ू‍, दक‍चरण‍IV और‍चरण‍V‍का‍काम‍पूरा‍ूज‍जान‍े के‍बाद,‍ जजुका‍काम‍ऄभी‍चल‍रूा‍ू,,‍िूर‍का‍50%‍ुे‍ऄजधक‍जाकजुत‍क्षेत्र‍(लडैं ‍पूललग‍क्षेत्रों‍और‍ूररत‍जाकाु‍ क्षेत्रों‍कज‍छजड़कर)‍मेरज‍स्ट्टेिनों‍ुे‍प,दल‍दरू ी‍के‍ऄंदर‍ूजगा।‍ऄंजतम‍छजर‍तक‍कनेजक्टजाटी‍में‍ुुधार‍करके‍ (देख:ें‍MOB3)‍और‍ुाावजजनक‍परराून‍की‍क्षमता‍म‍ें ुुधार‍के‍जलए‍ुुझाइ‍गइ‍पूल‍कज‍लागू‍करके‍ु‍े आु‍ ्ापक‍ऄाुंरचना‍की‍याजत्रयों‍की‍ुंख्‍या‍में‍पयावप्‍त‍ाृजद्ध‍की‍जा‍ुकती‍ू‍,(देखें:‍MOB2)। 9.7.4 एमअरटीएु‍के‍ऄन्य‍रूप‍ज,ु‍े मेरज‍लाआट‍/‍मेरज‍जनयज‍या‍एलअरटी‍जुस्ट्टम, बु‍र,जपड‍रांजजट‍(बीअरटी)‍ प्रणाली‍या‍कजइ‍ऄन्य‍प्रणाली,‍जज‍खण्‍ड‍9.7.2‍म‍ें दी‍गइ‍पररभाीा‍कज‍परू ा‍करती‍ू,, कज‍रेल-अधाररत‍ एमअरटीएु‍में‍मदद‍के‍जलए‍जाजिष्ट‍ुाआट‍ुंदभव, ऄनुमाजनत‍यात्री‍अदद‍के‍ऄनुुार‍जाकजुत‍दकया‍ जाएगा।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 65 9.7.5 ऄगली‍यजजना‍ऄाजध‍के‍दौरान‍जनम्नजलजखत‍कायवनीजतक‍एमअरटीएु‍कॉररडजर‍कज‍जाकजुत‍दकया‍जाना‍ चाजूए: i) मेरज‍कॉररडजर‍का‍बााना‍औद्यजजगक‍क्षेत्र, नरेला‍औद्यजजगक‍क्षेत्र, डीडीए‍द्वारा‍नरेला‍म‍ें जाकजुत‍ अााुीय‍क्षेत्र‍और‍कुंडली‍म‍ें प्रस्ट्ताजात‍अरअरटीएु‍स्ट्टेिन‍कज‍जजड़त‍े ुएए‍ररठाला‍मेरज‍स्ट्टेिन‍(रेड‍ लाआन)‍ुे‍नरेला‍तक‍जास्ट्तार‍करना। ii) मेरज‍कॉररडजर‍का‍द्वारका‍मेरज‍स्ट्टेिन‍ुे‍ूजत‍े ुएए‍ढांुा‍बु‍स्ट्टैंड‍मेरज‍स्ट्टेिन‍(ग्र‍ेलाआन)‍ुे‍नजफगढ- दौराला‍रजड‍तक‍जास्ट्‍तार‍और‍आुके‍ऄजतररक्त‍ ,‍झज्ज‍ र‍में‍एम्ु‍पररुर‍तक‍जास्ट्‍तार‍करना।‍ प्रस्ट्‍ताजात‍ललक‍ु‍े ब्ल‍ू लाआन‍ुे‍द्वारका‍मेरज‍स्ट्टेिन‍और‍अइजीअइ एयरपजटव‍के‍माग‍व ु‍े जजन‍एल (लडैं ‍पूललग‍क्षेत्र)‍और‍नजफगढ़‍के‍बीच‍ुीधे‍कनेजक्टजाटी‍ूजगी।‍आुुे‍ददल्ली‍के‍नागररकों‍कज‍ झज्जर‍म‍ेंनय‍ेएम्ु‍पररुर‍तक‍पुएचं ‍भी‍प्राप्‍त‍ूजगी। 9.7.6 लैंड‍पूललग‍क्षेत्रों‍में‍बड़े‍प,माने‍पर‍पारगमन‍कनेजक्टजाटी‍प्रदान‍करन‍े के‍जलए, एक‍ाृजद्धमान‍एप्रजच‍ कायावजन्ात‍की‍जाएगी।‍आन‍क्षेत्रों‍ुे‍िूर‍के‍जाजभन्न‍जूस्ट्ुों‍में‍अाागमन‍कज‍ुूज‍बनाने‍के‍जलए‍क्षेत्रों‍के‍ जाकाु‍के‍दौरान‍बीअरटी‍जुस्ट्टम‍या‍ूाइ‍स्ट्पीड‍बु‍मागों‍का‍कायावन्‍ायन‍दकया‍जाएगा।‍जाजिष्ट‍ कॉररडजर‍के‍ुाथ-ुाथ‍मेरज‍रेल‍प्रणाजलयां‍लाग‍ू की‍जा‍ुकती‍ू।, ‍ुभी‍लडैं ‍पूललग‍क्षेत्रों‍म‍ें रंक‍कनेजक्टजाटी‍ प्रदान‍करने‍के‍जलए‍एमअरटीएु‍के‍जाकाु‍के‍जलए‍यूइअर-II कज‍जािेी‍रूप‍ु‍ेलजक्षत‍दकया‍जाएगा। 9.7.7 बु‍प्रणाली:‍ईच्च‍गुणािा‍ााली‍ुड़क-अधाररत‍ुाावजजनक‍परराून‍प्रदान‍करने,‍ऄपयाप्तव ‍रूप‍ुे‍ुेाा‍ ााले‍क्षेत्रों‍तक‍पुएचं ‍प्रदान‍करने‍के‍जलए‍बु‍प्रणाली‍के‍बड़े‍अईटरीच‍कज‍अुान‍बनाया‍जाएगा, ुाथ‍ूी‍ एमअरटीएु‍प्रणाजलयों‍के‍जलए‍फीडर‍के‍रूप‍म‍ेंभी‍कायव‍दकया‍जाएगा। i) मेरज/‍अरअरटीएु‍स्ट्टेिनों‍ु‍े जजड़ने‍के‍जलए‍बु‍मागों‍कज‍यजु ि ुंगत‍बनाया‍जाएगा‍और‍ुाथ‍ूी,‍ कम‍ुाावजजनक‍परराून‍पुएचाँ ‍स्ट्तर‍ााले‍क्षेत्रों‍में‍बेूतर, ऄजधक‍बार‍ुेााएं‍प्रदान‍की‍जाएंगी‍(देख:ें‍ MOB2)। ii) ुंबंजधत‍एजेंजुयों‍कज‍यजजना‍बनानी‍चाजूए‍और‍ईन‍क्षेत्रों‍के‍जलए‍जािेी‍फीडर‍बु‍ुेााओं‍ (अरटीाी, मेरज‍फीडर, अदद)‍का‍ुंचालन‍करना‍चाजूए, जूां‍जुटी‍बु‍ुेाा‍कम‍ू‍, और‍जब‍ ुेक्ट‍र‍जाकजुत‍ूजते‍ू,ैं तब‍लडैं ‍पूललग‍क्षेत्रों‍में‍ुेाा‍देने‍के‍जलए‍जािेी‍मागों‍कज‍ुंचाजलत‍करना‍ चाजूए। iii) ुेाा‍स्ट्तरों‍में‍ुुधार‍के‍जलए‍गुणािा‍में‍ुुधार‍पूल‍(ुूचना‍प्रणाली, ुबं द्ध‍ऄाुंरचना‍ज,ुे‍बु‍ िेल्‍टर,‍बुों‍का‍ओ‍एंड‍एम, जािेी‍अाश्यकताओं‍कज‍परू ा‍करने‍के‍जलए‍जािेी‍ुेााओं‍कज‍िाजमल‍ करना, प्रीजमयम‍मागव‍अदद)‍कज‍ऄपनाया‍जा‍ुकता‍ू‍,(देख:ें‍MOB2)। 9.8 परराून‍ऄाुरं चना‍का‍पनु रूद्धार 9.8.1 ररग‍रेल‍ददल्ली‍की‍एक‍जाराुत‍म‍ें जमली‍ऄाुंरचना‍ू‍, और‍यू‍माल‍परराून‍म‍ें मूत्ापूणव‍भूजमका‍ जनभाती‍ू।, ‍ूालांदक, यात्री‍ुााररयां‍कम‍ू।ैं ‍आुकी‍ुााररयों‍की‍पुएचं ‍बढ़ान‍े के‍जलए‍पजब्लक‍प्‍लाजा‍का‍ ुृजन‍कर,‍पदयात्रा‍करन‍े ा‍ुाआदकल‍चलान‍े की‍ऄाुंरचना‍प्रदान‍कर‍और‍ईजचत‍ुाआनेज‍लगाकर‍प्रमखु ‍ ूॉल्ट‍स्ट्टेिनों‍के‍जलए‍ुुधारों‍कज‍कायावजन्ात‍दकया‍जा‍ुकता‍ू।, ‍मौजूदा‍मेरज‍स्ट्टेिनों‍ााले‍ररग‍रेल‍स्ट्टेिनों‍ कज‍एकीकृत‍करने‍के‍जलए‍ऄंतर-पररातवनीय‍ुुजाधाओं‍की‍यजजना‍बनाइ‍जा‍ुकती‍ू।, ‍ररग‍रेल‍एलाआनमेंट‍ ददल्ली‍के‍धरजूर‍क्षेत्रों,‍पाररजस्ट्थजतक‍ुंपजि‍के‍क्षेत्रों‍तथा‍कइ‍ााजणजज्यक‍क्षेत्रों‍कज‍जजड़ता‍ू,, पयवटकों‍की‍ अााजाूी‍के‍जलए‍एक‍जािेी‍ूॉप-ऑन‍और‍ूॉप-ऑफ‍ुेाा‍पर‍जाचार‍दकया‍जा‍ुकता‍ू।, ‍66 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 9.8.2 ददल्ली‍में‍ऄल्‍प‍प्रयुक्त‍ ‍परराून‍जािेीता/‍ुरं चनाओं‍और‍भजू म‍ुे‍आन‍ुंपजियों/‍भूजम‍का‍इष्ट‍तम‍ईपयजग‍ करन‍े और‍गर, -दकराया‍बॉक्ु‍राजस्ट्ा‍ऄजधकतम‍करन‍े का‍ऄच्‍छा‍ऄाुर‍प्राप्‍त‍ूजता‍ू।, ‍जनम्नजलजखत‍ कायवनीजतयों‍कज‍लाग‍ूदकया‍जाएगाः i) बु‍जडपज‍और‍टर्नमनलों‍का‍्ााुाजयक‍या‍ुुजाधा‍जाकाु‍के‍ुाथ-ुाथ‍बुए-स्ट्तरीय‍बु‍पार्ककग‍ ुुजाधाओं‍के‍रूप‍म‍ें अधुजनकीकरण तथा‍मुद्रीकरण‍दकया‍जाएगा;‍(देख:ें ‍डीुीएन)।‍आुुे‍जडपज‍और‍ टर्नमनलों‍की‍पार्ककग‍क्षमता‍बढ़‍जाएगी‍और‍ुाथ‍ूी‍भूजम‍का‍मूल्य‍बढ‍जाएगा।‍ुरकारी‍बुों‍की‍ पार्ककग‍के‍ुाथ-ुाथ‍पजब्लक‍पार्ककग‍के‍जाकाु‍के‍जलए‍बु‍टर्नमनलों‍और‍जडपज‍का‍ईपयजग‍दकया‍ जाना‍चाजूए,‍जाजिष्ट‍पररयजजना‍स्ट्थलों‍के‍जलए‍जनजी‍बुों‍की‍खजज‍करनी‍चाजूए।‍ 9.8.3 टीओडी‍के‍ऄनुुार‍रेलाे‍/‍मेरज‍/‍अरअरटीएु‍स्ट्टेिनों‍और‍जडपज‍म‍ें ओार‍स्ट्टेिन‍और‍ओार-र,क‍जाकाु‍ की‍ऄनुमजत‍दी‍जाएगी।‍(देख:ें‍DEV4)। 9.9 माल‍ढुलाइ‍ुभं ार‍तत्रं ‍और‍जातरण‍नटे ाकव 9.9.1 माल‍ढुलाइ‍ददल्ली‍के‍िूरी‍यातायात‍का‍एक‍बड़ा‍जूस्ट्ुा‍ू‍,और‍आुकी‍पयावारणीय‍काफी‍लागत‍ू।, ‍पूाी‍ और‍पजिमी‍पेररफेरल‍एक्ुप्रेुाे‍ुे‍िूर‍की‍ुड़कों‍का‍ईपयजग‍कर‍माल‍ढुलाइ‍यातायात‍म‍ेंकाफी‍ऄजधक‍ कमी‍अन‍े की‍अिा‍ू।, ‍जडजजटल‍प्रगजत‍और‍इ-कॉमुव‍के‍ईद्भा‍ुे,‍िूर‍म‍ें ुंभार‍तंत्र‍और‍माल‍भडं ारण‍ ुुजाधाओं‍की‍ऄजधक‍मागं ‍के‍ुाथ-ुाथ‍माल-भाडे‍की‍मांग‍में‍ाृजद्ध‍का‍ऄनुमान‍ू।, 9.9.2 ददल्ली‍के‍जलए‍ुीएमपी‍में‍िूर‍की‍ुड़कों‍ुे‍जाम‍कज‍कम‍करने,‍माल‍ढुलाइ‍एां‍िूर‍में‍ुभं ार‍तंत्र‍और‍ भाण्‍डागार‍केंद्रों‍म‍ें ुुधार‍करन‍े के‍जलए‍माल‍ढुलाइ‍के‍जलए‍यजजना‍और‍जास्ट्‍ततृ ‍कायवनीजतयां‍मुूय, ा‍करेगा।‍ ुीएमपी‍में‍रेल‍अधाररत‍परराून‍(रेल‍/‍ररग‍रेल‍ऄाुंरचना‍का‍लाभ‍ईठात‍े ुएए)‍के‍मा्यम‍ु‍े माल‍ ढुलाइ‍की‍क्षमता‍बढ़ाने‍और‍कायावत्मक‍यजजना‍2031‍के‍तूत‍एनुीअरपीबी‍द्वारा‍प्रस्ट्ताजात‍क्षेत्रीय‍ अइएफुी‍के‍ुाथ‍कुिल‍आंटरललक्ु‍जाकजुत‍करन‍े के‍जलए‍जुफाररिें‍िाजमल‍ू।ैं 9.9.3 अइएफुी/अइुीडी‍प्रमुख‍रजजगार‍केंद्र‍ू‍ैं जूां‍काफी‍ऄजधक‍लजग‍अते‍ू।ैं ‍ुीएमपी‍िूर‍के‍बाकी‍जूस्ट्ुों‍ के‍ुाथ‍ऐुी‍ुुजाधाओं‍की‍कनेजक्टजाटी‍(ुाावजजनक‍परराून‍ुजूत)‍म‍ें ुुधार‍के‍जलए‍जाजिष्ट‍जुफाररि‍ें करेगा। 9.9.4 नए‍एकीकृत‍फ्रेट‍कॉम्प्लेक्ु‍(अइएफुी) कज‍जाजभन्न‍ुंभार‍तंत्र,‍भाण्ड‍ ागारण‍और‍माल‍ढुलाइ‍ुंबधं ी‍ जरूरतों‍कज‍एकीकृत‍करके‍बुए-‍कायावत्‍मक‍स्ट्थ‍ ान‍के‍रूप‍म‍ें जाकजुत‍दकया‍जाएगा।‍पुनरूद्धार‍के‍जलए‍ ईपयुि ‍प्रजत्ुाून‍के‍मा्यम‍ुे‍मौजूदा‍अइएफुी‍के‍अधजु नकीकरण‍कज‍बढ़ााा‍ददया‍जाएगा‍(देख:ें‍ DEV3)।‍नया‍अइएफुी,‍यदद‍कजइ‍ूज, ऄजधमानतः‍राष्ट्रीय‍राजमागव‍(एनएच) पर‍ऄाजस्ट्थत‍ूजगा‍और‍ िूर‍के‍माल‍ढुलाइ‍जातरण‍नटे ाकव‍के‍ुाथ‍जडु ा‍ूजगा। 9.9.5 ुूायक‍इ-कॉमुव‍जातरण‍नेटाकव: इ-कॉमुव‍के‍ईद्भा‍के‍कारण, स्ट्थानीय‍स्ट्तर‍पर‍'भाण्‍डागार‍ुे‍घर’‍ जातरण‍और‍माल‍भडं ारण‍नेटाकव‍की‍एक‍नइ‍परत‍की‍अाश्यकता‍ू।, ‍इ-कॉमुव‍के‍ुंगरठत‍जाकाु‍कज‍ ुुजाधाजनक‍बनाने‍के‍जलए, थजक‍बाजारों,‍अइएफुी‍और‍औद्यजजगक‍क्षेत्रों‍में‍भाण्‍डागारण‍ुुजाधाओं, जातरण‍केंद्रों‍अदद‍ज,ुे‍ईपयजग‍की‍ऄनुमजत‍दी‍जाएगी।‍आन‍ुुजाधाओं‍िूर‍के‍ऄदं र‍एक‍ूब-एंड-स्ट्पजक‍ नेटाकव‍स्ट्‍थाजपत‍ूजगा‍और‍माल‍भाडा‍जातरण‍म‍ें ााून‍ुे‍तय‍दकलज‍मीटर‍ुफर‍इष्ट‍तम‍ूजगा।‍ऄंजतम‍ छजर‍तक‍जातरण‍के‍जलए‍आलेजक्रक‍ााूनों/एनएमाी‍के‍ईपयजग‍कज‍प्रजत्ुाजूत‍दकया‍जाएगा।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 67 9.10 आलजे क्रक–गजतिीलता 9.10.1 ददल्ली‍ म‍ें इ-मजजबजलटी‍ गजत‍ पकड‍रूी‍ ू‍, और‍पररकल्पना‍ ू‍, दक‍ नीजतगत‍अश्रय,‍प्रजत्ुाून‍ और‍ ऄाुंरचनागत‍प्रााधानों‍ुे,‍ऄंतत:‍ जीााश्म‍ईंधन‍अधाररत‍ााूनों‍पर‍इ-ााून‍अजधपत्‍य‍जमा‍लेंगे।‍ आुे‍प्राप्त‍करने‍के‍जलए‍जनम्नजलजखत‍कायवनीजतयों‍कज‍लागू‍दकया‍जाएगा: i) जाजभन्न‍ुाावजजनक‍स्ट्थानों, ुड़क‍पर‍पार्ककग‍क्षेत्रों‍और‍ुाावजजनक‍पार्ककग‍स्ट्थलों‍पर‍पूरे‍िूर‍ में‍आलेजक्रक‍ााूनों‍के‍जलए‍ुाावजजनक‍चार्मजग‍ऄाुंरचना‍ईपलब्ध‍करायी‍जाएगी।‍इ-ााूनों‍ की‍बाजार‍में‍जूस्ट्ुेदारी‍म‍ें प्राृजियों‍के‍अधार‍और‍जग्रड‍ब्लॉक‍में‍ऄनुमाजनत‍यातायात‍के‍ अधार‍पर‍आुे‍ाृजद्ध‍के‍अधार‍पर‍बढ़ाया‍जा‍ुकता‍ू।, ‍चार्मजग‍ईपकरण‍के‍जडजाआन‍का‍ मानकीकरण‍न‍ूजन‍े ुे,‍ुभी‍ुाावजजनक‍चार्मजग‍स्ट्टेिनों‍पर‍कइ‍चाजवर‍मॉडल‍ााल‍े दकयजस्ट्क‍ ईपलब्ध‍ूोंगे। ii) ईंधन‍स्ट्टेिन, मेरज‍स्ट्टेिन‍पार्ककग, रेलाे‍पार्ककग‍क्षेत्र, ऄजधकृत‍ुड़क‍पर‍पार्ककग‍या‍ऄन्य‍ ुरकारी‍स्ट्ााजमत्ा‍ााली‍पार्ककग‍पर‍इाी‍चार्मजग‍ऄाुंरचना‍लगाइ‍जाएगी।‍ुभी‍नए‍ईंधन‍ स्ट्टेिनों‍के‍अांटन‍में‍जाद्यतु ‍चार्मजग‍ऄाुंरचना‍के‍जलए‍अांरटत‍स्ट्थान‍ऄजनाायव‍ूजगा। iii) ुंबंजधत‍एजेंजुयों‍द्वारा‍पयााव रणीय‍रूप‍ु‍े ुुरजक्षत‍और‍कुिल‍ब,टरी‍ररुाआकललग‍इकज‍ जुस्ट्टम‍के‍जलए‍प्रााधान‍दकया‍जाएगा। iv) ुंबंजधत‍एजेंजुयों‍द्वारा‍ऄपने-ऄपन‍े क्षेत्रों‍म‍ें ऄलग‍/‍ऄनन्य‍ब,टरी‍ररुाआकललग‍केंद्र‍स्ट्थाजपत‍ करने‍के‍जलए‍अाश्यक‍भूजम‍प्रदान‍की‍जाएगी। 9.11 स्ट्म‍ ाटव‍परराून‍के‍जलए‍कुिल‍परराून‍प्रणाजलया ाँ 9.11.1 कुिल‍परराून‍प्रणाली‍(अइटीएु) में‍डाटा‍ररपॉजजटरी‍और‍कृजत्रम‍बुजद्धमत्‍ता‍का‍ईपयजग‍दकया‍जाएगा‍ तादक‍यू‍िूर‍म‍ें जाजभन्न‍परराून‍मजड‍/‍प्रणाजलयों‍के‍बीच‍कुिलता‍और‍ुमन्ाय‍कज‍बेूतर‍बनान‍े म‍ें एक‍प्रमुख‍भूजमका‍जनभा‍ुके। i) ददल्ली‍के‍जलए‍एक‍मजजबजलटी‍डाटा‍ररपॉजजटरी‍(एमडीअर)‍स्ट्थाजपत‍की‍जानी‍चाजूए, जूााँ‍ यातायात‍की‍मात्रा‍और‍ओ-डी‍रेंड्ु, दघु वटना‍ूॉटस्ट्पॉट,‍भीड़भाड़, माल‍यातायात‍अदद‍ुे‍ ुंबंजधत‍जािुनीय‍और‍ुटीक‍डेटा‍एक‍एकीकृत‍ढांचे‍में‍ईपलब्ध‍दकए‍जा‍ुकें।‍जाजभन्न‍पारगमन‍ एजेंजुयों‍ुे‍एकत्र‍डाटा‍का‍मानकीकरण‍दकया‍जाएगा‍और‍ुाेक्षण‍‍एां‍ुूचना‍के‍मा्यम‍ुे‍आु‍े जनयजमत‍रूप‍ुे‍ऄद्यतन‍दकया‍जाएगा। ii) अइटीएु‍के‍मा्यम‍ुे‍स्ट्माटव‍ुमाधान‍ुे‍ुंभाजात‍चुनौजतयों‍का‍पूाावनुमान‍लगाने‍और‍ईन्ू‍ें कम‍ करन,े ‍ुाावजजनक‍परराून‍फ्लीट‍ुंचालन‍के‍गजतिील‍और‍कुिल‍प्रबंधन‍के‍जलए‍पूाावनुमान‍ तकनीकों‍ का‍ ईपयजग‍ करने‍ और‍ याजत्रयों‍ कज‍ ररयल‍ टाआम‍ जानकारी‍ प्रदान‍ करन,े‍ परराून‍ प्रणाजलयों‍का‍ुमुत्‍थान‍बढ़ाने‍के‍जलए‍ररयल-टाआम‍डाटा‍का‍ईपयजग‍दकया‍जा‍ुकेगा। iii) स्रजत‍ुे‍गंत्‍तक‍जनबावध‍अााजाूी‍ुुजनजित‍करके‍अपातकालीन‍ााूनों‍(एम्बुलेंु, ऄजग्निमन‍ ााून‍आत्यादद)‍की‍पूा-व चेताानी‍और‍प्रजतदक्रया‍ुमय‍कज‍कम‍करन‍े के‍जलए‍अइटीएु‍का‍ईपयजग‍ करना। --- x --- x ---- x --- x --- ऄ्याय कजड 10.0 ुाझा‍गजतिीलता‍की‍ददिा‍म‍ेंस्ट्थानातं रण MOB2 10.1.1 यजजना‍ऄाजध‍का‍एक‍मूत्त्ापूणव‍ईद्देश्य‍ददल्ली‍के‍्ापक‍ुाावजजनक‍और‍ुाझा‍परराून‍ुंरचना‍और‍तंत्र‍का‍ जनमावण‍करना‍ू‍, और‍ऄपन‍े नागररकों‍की‍‘कुिल’‍गजतिीलता‍कज‍ुुगम‍बनाने‍के‍जलए‍जनजी‍ााूनों‍पर‍जनभवरता‍ कज‍कम‍करना‍ू।, ‍आुजलए‍दज-गुनी‍दक्षता‍का‍ऄनुुरण‍दकया‍जाएगा, ऄथावत‍(i) मूल‍स्ट्थान‍ु‍े गतं ्‍तक‍(लबद‍ु68 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] दर‍लबद‍ुगजतिीलता)‍यात्रा‍करने‍के‍जलए‍ऄपेजक्षत‍ुमय‍और‍प्रयाु‍कज‍कम‍करना और‍(ii) यू‍ुुजनजित‍करना‍ दक‍यात्रा‍कम‍काबवन‍फुट-लप्रट‍(ुुगम‍गजतिीलता)‍के‍ुाथ‍परू ी‍ूज।‍आुे‍परराून‍के‍ुाझा‍ुाधनों‍का‍ईपयजग‍ करते‍ुएए‍ऄजधक‍लजगों‍कज‍स्ट्थानांतररत‍करके‍प्राप्त‍दकया‍जाएगा‍जजुमें‍ुाावजजनक‍परराून,‍ज,ुे‍बु‍और‍रेल‍ के‍ुाथ-ुाथ,‍म्याती‍ुाावजजनक‍परराून, ऐप-अधाररत‍ुेााएं‍अदद‍ुजम्मजलत‍ू।ैं ‍कायवनीजतयााँ,‍ज,ुे‍दक‍ पारगमन-ईन्मुख‍जाकाु, ग,र-जनजी‍परराून‍ुेाा‍स्ट्तरों‍कज‍ईन्नत‍करना और‍जनजी‍ााूनों‍के‍ईपयजग‍कज‍ ूतजत्ुाजूत‍करने‍के‍जलए‍कठजर‍जनयामक‍ईपायों‍कज जनम्नजलजखत‍पररकल्पना‍करत‍े ुएए‍लाग‍ूदकया‍जाएगाः i) िूर‍म‍ेंकुल‍मजटर‍चाजलत‍यात्राओं‍के‍ऄनुपात‍के‍रूप‍म‍ेंजनजी‍परराून‍का‍कम‍दकया‍ुएअ‍जूस्ट्ुा। ii) प्रजत‍्जि ‍मजटर‍चाजलत‍यात्राओं‍की‍औुत‍ुंख्या, औुत‍यात्रा‍ुमय‍और‍औुत‍यात्रा‍की‍दरू ी‍के‍ ऄनुुार‍िूर‍म‍ेंयात्री‍के‍अाागमन‍की‍बेूतर‍कायव‍क्षमता। 10.2 भजू म‍ईपयजग‍और‍परराून‍के‍बीच‍ुामजं स्ट्य 10.2.1 यू‍यजजना‍ुाावजजनक‍परराून‍लबदओंु ,‍ज,ु‍े दक‍मेरज‍और‍रेलाे‍स्ट्टेिनों, मल्टी-मजडल‍ूब, प्रमुख‍बु‍ टर्नमनलों, अदद‍के‍जनकटाती‍घरों,‍नौकररयों‍और‍ईपलब्ध‍ुुजाधाओं‍के‍ुघनता‍और‍आनके‍जमश्रण‍का‍ ुाोच्च‍ईपयजग‍करके‍भूजम‍ईपयजग‍और‍परराून‍के‍एकीकरण‍कज‍प्रजत्ुाजूत‍करेगी।‍पारगमन‍स्ट्थानों‍ तक‍बेूतर‍पुएचाँ ‍बनाने‍के‍ुाथ,‍आु‍तरू‍का‍जाकाु‍ऄजधक‍लजगों‍कज‍ऄपनी‍द,जनक‍यात्रा‍की‍ अाश्यकताओं‍के‍जलए‍ुाावजजनक‍परराून‍का‍ईपयजग‍करन‍ेके‍जलए‍प्रजत्ुाजूत‍करेगा। 10.2.2 भूजम‍ईपयजग‍और‍परराून‍एकीकरण‍जनम्नजलजखत‍कायवनीजतयों‍के‍मा्यम‍ु‍ेलागू‍दकया‍जाएगा: i) टीओडी नजड्ु‍म‍ें गून‍जमजश्रत‍ईपयजग‍जाकाु:‍टीओडी‍नजड्ु‍(देखें:‍डीइाी4)‍के‍रूप‍में‍ुंदर्नभत‍ चुलनदा‍कायवनीजतक‍पारगमन‍स्ट्टेिनों‍का‍जाकाु एफएअर‍के‍ईच्चतम‍मानदंडों‍और‍ऄनुमेय‍जमजश्रत‍ ईपयजग‍के‍ुाथ‍दकया‍जाएगा।‍ये‍मानदंड‍केाल‍एक‍जचजननत‍प्रभाा‍क्षेत्र‍(500-800‍मी.‍की‍ ऄनुमाजनत‍पररजध)‍के‍ऄन्दर‍लागू‍ूोंग,े जजुकी‍यजजना‍ाॉकेजबजलटी‍और‍ऄंजतम‍मील‍कनेजक्टजाटी‍ के‍जलए‍बनायी‍जाएगी।‍टीओडी नजड्ु‍में‍अइएुबीटी, प्रमुख‍रेला‍े और‍अरअरटीएु‍स्ट्टेिनों, मेरज‍आंटरचेंज‍और‍ऄन्य‍चुलनदा‍स्ट्टेिनों‍ज,ुे‍चयजनत‍प्रमुख‍परराून‍जंक्िन‍ुजम्मजलत‍ूोंगे, जजन्ू‍ें भजाष्य‍के‍अर्नथक‍और‍ुांस्ट्कृजतक‍केन्द्रों‍के‍रूप‍में‍ईनकी‍क्षमता‍के‍जलए‍पूचाना‍जाएगा।. ii) पारगमन‍प्रभाा‍क्षत्रे ‍म‍ें पनु रूद्धार‍यजजनाएाँ:‍िूर‍भर‍म‍ें टीओडी‍जुद्धांतों‍के‍कायावन्ायन‍कज‍ुुगम‍ बनाने‍के‍जलए,‍ना‍केाल‍चुलनदा‍टीओडी‍नजड्ु‍पर, बजल्क‍ुभी‍पुनरुत्थान‍पररयजजनाओं‍के‍जलए‍ ऄन्य‍ुभी‍पारगमन‍स्ट्टेिनों‍के‍500‍मीटर‍पररजध‍के‍ऄतं गवत,‍जमजश्रत‍ईपयजग,‍पार्ककग, ग्राईण्ड‍ ‍ कारेज‍और‍दकनारे‍तक‍जनर्नमत‍(जबल्‍ट‍टू‍एज)‍ुदक्रय‍ऄग्र-भाग‍के‍जलए‍जाजिष्ट‍मानदडं ‍की‍ऄनुमजत‍ दी‍जाएगी।‍ूालांदक, आु‍तरू‍की‍पररयजजनाओं‍के‍जलए‍ऄनुमये ‍एफएअर‍और‍ऄन्य‍मानदंड‍ददल्ली‍ की‍पुनरुत्थान‍नीजत‍के‍ऄनुुार‍ूोंगे।‍यू‍यजजना‍ऄाुंरचना‍पर‍बल‍देने‍ााले‍ऄजतररि ‍एफएअर‍/‍ जनर्नमत‍स्ट्थल‍के‍जबना‍जीांत‍और‍ुदक्रय‍स्ट्टेिन‍क्षेत्रों‍के‍जनमावण‍के‍जलए‍ऄनुमजत‍प्रदान‍करेगी।‍(देख:ें‍ डीइाी3) iii) नए‍ूाइ‍स्ट्प‍ीड‍राजं जट‍कॉररडजर‍(यइू अर)‍के‍ुाथ,‍टीडीअर‍प्राप्त‍करन‍े ााल‍े क्षत्रे :‍लडैं ‍पूललग‍क्षेत्रों‍ (देख:ें‍डीइाी1)‍म,ें िूरी‍जास्ट्तार‍ुड़कों‍(यूइअर)‍के‍ुाथ,‍ईच्च‍एफएअर‍की‍एकाग्रता‍की‍ऄनुमजत‍ देने‍ााल‍ेदकुी‍क्षेत्र‍में‍लचील‍ेस्ट्थान‍और‍ऄजधकृत‍एफएअर‍के‍लजलडग‍की‍ऄनुमजत‍दी‍जाएगी।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 69 10.2.3 आन‍ुभी‍पारगमन‍ईन्मुख‍जाकाु‍की‍रूपरेखा‍पूरे‍िूर‍म‍ें ुुरजक्षत, चलन‍े यजग्य‍और‍जीांत‍क्षेत्रों‍कज‍ ुुजनजित‍करन‍े के‍जलए‍ुघन‍ुड़क‍तंत्रों, बेूतर‍ुाावजजनक‍क्षेत्रों‍और‍ुदक्रय‍ुाावजजनक‍ऄग्र-भागों‍कज‍ ुुजनजित‍करन‍े ूते ‍ु बनायी‍जाएगी। 10.3 ुााजव जनक‍परराून‍एा‍ंुाझा‍परराून‍ुाधनों‍म‍ेंुधु ार‍करना 10.3.1 लजगों‍कज‍परराून‍के‍ुाावजजनक‍या‍ुाझा‍मा्यमों‍कज‍चनु न‍े के‍जलए‍प्रजत्ुाजूत‍करन‍े के‍जलए‍एक‍ मूत्त्ापूणव‍कायवनीजत‍ुेाा‍के‍कुिल‍स्ट्तर‍ुे‍जुड़ी‍ईनकी‍जािुनीयता‍और ुुगम्यता‍में‍ुुधार‍करना‍ू।, ‍ ूालांदक,‍ुाझा‍परराून‍मा्यमों‍में‍ुुधार‍बड़े‍स्ट्तर‍पर‍जनजी‍ुेाा‍प्रदाताओं‍द्वारा‍दकया‍जाना‍जारी‍ रखा‍जाएगा, तथाजप‍ुाावजजनक‍परराून‍म‍ें्ापक‍ुुधार‍की‍अाश्यकता‍ू।, 10.3.2 ुााजव जनक‍परराून‍का‍ुगु म्यता‍स्ट्तर:‍ुाावजजनक‍परराून‍के‍ुुगम्यता‍स्ट्तर‍(पीटीएएल) के‍जास्ट्तृत‍ जाश्लेीण‍कज‍िूर‍के‍जलए‍ऄपनाया‍जाएगा।‍ुमय-ुमय‍पर‍आुे‍ऄद्यतन‍और‍ऄजधुूजचत‍करने‍के‍जलए‍ जािेीज्ञ‍एजेंुी‍द्वारा‍ुंचालन‍दकया‍जाएगा।‍पीटीएएल‍‍म,लपग‍ुाावजजनक‍परराून‍की‍पुएचाँ ‍का‍ मूल्यांकन‍करन‍े म‍ें ुूायता‍प्रदान‍करेगी‍और‍स्ट्थाजनक‍रूप‍ु‍े ईच्च-ुुगम्यता‍ााल‍े क्षेत्रों‍कज‍जनम्न‍ ुुगम्यता‍ााले‍क्षेत्रों‍ुे‍पथृ क‍कर‍दगे ी।‍आुके‍जाश्लेीण‍में‍बुों, मेरज‍रेल‍और‍ईनकी‍फीडर‍ुेााओं‍के‍ ऄजतररि , ग्रामीण‍ुेाा, ऑटजररक्िा, म,क्ुी‍क,ब, अरटीाी‍आत्यादद‍ज,ु‍े ऄनुबंजधत‍अइपीटी‍मजड‍ ुजूत,‍ुभी‍ुाझा‍मा्यम‍ुजम्मजलत‍ूोंगे।‍आु‍तरू‍के‍जाश्लेीण‍के‍अधार‍पर,‍ुम्पूण‍व िूर‍कज‍ पीटीएएल‍की‍जनम्नजलजखत‍श्रेजणयों‍में‍जाभाजजत‍दकया‍जा‍ुकता‍ू:, ताजलका‍10.0:‍पीटीएएल‍श्रणे ी पीटीएएल एक्ुुे ‍आंडक्े ु‍रेंज 0 (जनकृष्ट) 0 - 2 1 2 -3 2 3 – 5.5 3 5.5 - 7 4 7 – 8.5 5 8.5 - 12 6 12 - 20 7 20 - 30 8 (ुबुे‍ऄच्‍छा) 30 और‍उपर i) ुाावजजनक‍परराून‍ऄाुंरचना‍में‍ुभी‍भााी‍ुुधार‍और‍क्षेत्र‍के‍ुुधार‍के‍प्रस्ट्ताा‍आु‍मूल्यांकन‍ पर‍अधाररत‍ूोंगे।‍ददल्ली‍के‍ुीएमपी‍(देख:ें ‍MOB1)‍म‍ें 2041‍तक‍िूर‍के‍ुभी‍क्षेत्रों‍में‍की‍कम‍ ुे‍कम‍पीटीएएल‍4‍ग्रेड‍ऄर्नजत‍करन‍े के‍जलए‍एक‍जास्ट्तृत‍रजड‍म,प‍ुजम्मजलत‍ूजगा। ii) यू‍जाश्लेीण‍ईच्च‍पीटीएएल‍मल्ू यों‍और‍ईच्च‍ुघनता‍ााल,े‍परन्तु‍कम‍ुाावजजनक‍परराून‍याजत्रयों‍ ााले‍क्षेत्रों‍की‍पूचान‍करन‍े म‍ें भी‍ुूायता‍प्रदान‍कर‍ुकता‍ू।, ‍यू‍दद.जा.प्रा./स्ट्थानीय‍जनकायों‍70 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] और‍ुंबंजधत‍पारगमन‍एजेंजुयों‍द्वारा‍दकराया‍युजि करण, बेूतर‍ुुगम्यता, कायवनीजतक‍जाकाु‍ अदद‍के‍रूप‍में‍अग‍ेकी‍कारवााइ‍कज‍ुुगम‍बना‍ुकता‍ू।, 10.3.3 दकराए‍कज‍यजु ि ुगं त‍बनाना:‍कम‍और‍म्यम‍दरू ी‍के‍जलए‍ुाावजजनक‍परराून‍के‍ईपयजग‍कज‍बेूतर‍ बनाने‍के‍जलए ऄक्ुर‍िूर‍ु‍े बाूर‍की‍यात्राओं, ईच्च‍ुघनता‍ााल‍े क्षेत्रों‍म‍ें बढ़ी‍ुएइ‍ुााररयों‍और‍ दकराए‍कज‍युजि ुंगत‍बनान‍ेपर‍ुंबंजधत‍एजेंुी‍द्वारा‍जाचार‍दकया‍जा‍ुकता‍ू।, 10.3.4 एक्ु‍ प्रुे ‍पजब्लक‍राुं पजटव‍रूट:‍डीटीुी‍और‍एमअरटीएु‍एजजें ुयााँ‍एक्ुप्रेु‍रूट‍की‍यजजना‍पर‍जाचार‍ करेंगी, जज‍ईच्च‍फुटफॉल‍स्ट्टेिनों‍/‍गंत्ों‍कज‍आु‍तरू‍ु‍े जजड़ती‍ू‍, दक‍यात्रा‍के‍दौरान‍स्ट्टॉप/‍ूाल्ट‍ स्ट्टेिनों‍की‍ुंख्या‍कम‍ूज‍जाए‍और‍यात्रा‍के‍ुमय‍का‍बेूतर‍ढंग‍ु‍ेईपयजग‍ूज‍ुके।‍(देख:ें‍MOB1) 10.3.5 प्रीजमयम‍बु‍ुाे ाएाँ:‍ुुजाधा‍(पुएचाँ ‍और‍जािुनीयता‍में‍ुुगमता)‍और‍अराम‍(जलाायु‍जाीयक‍ अराम‍और‍ुुजाधाओं‍की‍गुणािा)‍कुछ‍प्रमुख‍कारण‍ू‍ैं जजुके‍पररणामस्ट्ारूप‍लजग‍जनजी‍परराून‍का‍ ईपयजग‍करना‍जारी‍रखते‍ू।ैं ‍प्रीजमयम‍बु‍ुेाा‍ुंचालन‍कज‍िूर‍के‍ईन‍जचजननत‍ईच्च‍अाृजि‍ााले‍ मागों‍म‍ें खजज‍े जान‍े की‍अाश्यकता‍ू‍, जज‍घरों‍कज‍कायवस्ट्थलों‍के‍ुाथ‍जजड़त‍े ूों।‍आनकी‍रूपरेखा‍ जनयजमत‍जनधावररत-मागों, िटल‍ुेााओं‍के‍ुाथ-ुाथ‍ऑन‍जडमांट‍ऐप-अधाररत‍ुेााओं‍के‍जमश्रण‍के‍ रूप‍म‍ेंबनायी‍जा‍ुकती‍ू।, 10.3.6 जािीे ‍ुाे ाएं:‍आु‍यजजना‍का‍लक्ष्य‍रात‍के‍ुमय‍की‍ऄथ्व ास्ट्थाओं‍कज‍ईच्च‍अर्नथक‍ईत्पादकता‍कज‍ बढ़ााा‍देने‍के‍ुाथ-ुाथ‍रात‍के‍ुमय‍जीांत‍और‍ुरु जक्षत‍ुाावजजनक‍स्ट्थलों‍की‍ईपलब्धता‍में‍ाृजद्ध‍ करना‍ू।, ‍डीएमअरुी‍और‍डीटीुी‍कज‍पूरे‍िूर‍में‍जाजिष्ट‍जनधावररत‍मागों‍और‍तंत्रों‍के‍ुाथ‍तथा‍ ्ाूायवता‍के‍ऄनुुार‍जािेी‍ऄाुरों‍एां‍त्यौूारों‍के‍जलए‍कम‍अाृजि‍ााली‍राजत्रकालीन‍ुेााओं‍कज‍ ुंचाजलत‍करन‍े के‍जलए‍प्रजत्ुाजूत‍दकया‍जाना‍चाजूए। 10.3.7 बु‍ुाे ाओं‍की‍गणु ािा‍म‍ेंुधु ार: i) ददल्ली‍परराून‍ऄाुंरचना‍जाकाु‍जनगम‍(डीटीअइडीुी) द्वारा‍बु‍के‍अश्रय-स्ट्थलों‍का‍ईन्नयन‍ दकया‍जाएगा, जजुम‍ें ुाावजजनक‍ुुगम्यता‍की‍जाजिष्टताए,ाँ दश्ृ य-श्राण‍ुाावजजनक‍ुूचना‍प्रणाली, ुीुीटीाी, अपात‍जस्ट्थजत‍के‍जलए‍ुंकट‍बटन, ाॉटर‍दकयजस्ट्‍क‍और‍ुाावजजनक‍ुुजाधाएाँ‍िाजमल‍ू।ैं ii) मागों, ुमय‍ुाररणी, अगमन‍ुमय, यात्रा‍ुमय, कनेक्िनों, घटनाओं, जालंबों, दकराए‍और‍छूट‍की‍ जानकारी‍प्रदान‍करने‍के‍जलए‍एक‍जािुनीय‍और‍ाास्ट्तजाक‍ुमय‍की‍यात्री‍ुूचना‍प्रणाली‍ (पीअइएु)‍कज‍लाग‍ूदकया‍जाना‍चाजूए। 10.4 एकीकृत‍बुए-मजडल‍परराून‍प्रणाली‍(मल्टी-मजडल‍राुं पजटव‍जुस्ट्टम) 10.4.1 मूल‍स्ट्थान‍एां‍गंत्‍के‍बीच‍याजत्रयों‍की‍यात्रा‍म‍ें यात्रा‍के‍एक‍या‍कइ‍ुाधन‍ुजम्मजलत‍ूज‍ुकते‍ू।ैं ‍ यू‍यजजना‍पूरी‍यात्रा‍के‍दौरान‍ुभी‍नागररकों‍के‍जलए‍जनबावध‍और‍कुिल‍लबदु-दर-लबद‍ुगजतिीलता‍कज‍ ुुगम‍बनाएगा।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 71 10.4.2 जाजभन्न‍ुाधनों‍में‍नेटाकव‍एकीकरण‍आु‍तरू‍की‍जनबावध‍कनजे क्टजाटी‍कज‍प्राप्‍त‍करने‍में‍प्रमुख‍भूजमका‍ जनभाएगा।‍ ्ापक‍ गजतिीलता‍ यजजना‍ के‍ एक‍ भाग‍ के‍रूप‍ में‍ एक‍ एकीकृत‍ बुए-मजडल‍ परराून‍ कायवनीजत‍त,यार‍की‍जानी‍चाजूए‍जज‍जाजभन्न‍ुाधनों‍के‍जलए‍ुमय,‍अाृजि‍और‍मागों‍कज‍ुुुंगत‍करन‍े ूते ु‍ ुंस्ट्तुजत‍ प्रदान‍ करती‍ ूज।‍ बुए-मजडल‍ परराून‍ केंद्र‍ (एमएमटीएच) का‍ जाकाु‍ एमएमअइ कायवनीजतयों‍कज‍लाग‍ूकरन‍े के‍जलए‍एक‍मूत्त्ापूण‍व पूलू‍ूजगा।‍(देख:ें‍MOB1) 10.4.3 मल्टी-मजडल‍परराून‍केंद्र‍(एमएमटीएच): ददल्ली‍म‍ें कइ‍ईच्च‍फुटफॉल‍रांजजट‍नजड्ु‍के‍पाु‍एक‍ूी‍स्ट्थान‍पर‍कइ‍ुाधन‍ईपलब्ध‍ू,ैं‍ज,ुे‍दक‍रेला‍े स्ट्टेिन, अइएुबीटी, अरअरटीएु स्ट्टेिन‍ और‍ मेरज‍ स्ट्टेिन।‍ आन्ू‍ें मल्टी-मजडल‍ पारगमन‍ केंद्र‍ (एमएमटीएच) के‍रूप‍में‍जाकजुत‍दकया‍जाएगा, जजुका‍ुंदभव‍पूावाती‍यजजना‍म‍ें मेरजपॉजलटन‍प,ुेंजर‍ टर्नमनल‍या‍आंटीग्रेटेड‍प,ुेंजर‍टर्नमनल‍के‍रूप‍म‍ें ददया‍गया‍ू‍, जज‍डीइाी4‍के‍ऄनुुार‍जाकाु‍मानदंडों‍के‍ जलए‍पात्रता‍रखते‍ू।ैं i) यूएमटीए/ुमन्ाय‍ुजमजत‍एमएमटीएच पररयजजनाओं‍के‍ुमजन्ात‍जनयजजन‍और‍जनष्पादन‍के‍जलए‍ ुभी‍ुंबंजधत‍पारगमन‍एजेंजुयों‍कज‍एक‍ुाथ‍लाने‍के‍जलए‍ईिरदायी‍ूोंगी।‍ुभी‍ुाधनों‍में‍ुूज‍ एकीकरण‍ुुजनजित‍करन‍े के‍जलए‍एक‍ुंयुि ‍एमएमटीएच-स्ट्तरीय‍लेअईट‍यजजना‍तय, ार‍की‍ जाएगी।‍एजेंजुयां‍ऄपनी‍भूजम‍कज‍ुमाजूत‍करके‍ुंयुि ‍ईपक्रम‍भी‍चला‍ुकते‍ू‍ैं जूां‍पर‍कइ‍ ुाधनों‍कज‍एक‍ूी‍भान‍या‍पररुर‍म‍ेंएकीकृत‍दकया‍जा‍ुकता‍ू।, ‍(देख:ें ‍MOB1) ii) रेलाे‍पटररयों, ुड़कों, नालों‍अदद‍ज,ुी‍ुुजाधाओं‍ुे‍पथृ क‍दकए‍गए‍ग,र-ुजन्नजूत‍भू-खण्‍डों‍के‍ मामले‍म,ें स्ट्काइाॉक, ुबाे‍अदद‍ज,ु‍े कनेक्टुव‍का‍ईपयजग‍करन‍े ााल‍े भानों‍के‍एकीकरण‍की‍ ऄनुमजत‍दी‍जानी‍चाजूए, बिते‍जाजभन्न‍ुाधनों‍के‍जनबावध‍ुंचालन‍कज‍ुुजनजित‍करने‍के‍जलए‍ ुमुजचत‍स्ट्ाीकृजत‍बनाइ‍रखी‍गयी‍ूज।‍(देख:ें‍डीइाी4)। iii) ुभी‍एमएमटीएच‍पररयजजनाओं‍का‍जािेी‍फजकु‍पूली‍और‍ऄंजतम‍मील‍की‍कनेजक्टजाटी‍कज‍ ुुगम‍बनाने‍की‍ददिा‍में‍भी‍ूजगा।‍आु‍तरू‍के‍ुभी‍आंटरफेु‍कज‍ररटेल, ाेंलडग‍जजन, फूड‍एंड‍ बेारेज‍अईटलेट्ु, ुाावजजनक‍ुुजाधाओं‍ज,ुे‍िौचालय‍और‍पेयजल‍फाईंटेन, अदद‍की‍ुमुजचत‍ प्रााधानों‍के‍मा्यम‍ु‍ेऄच्छी‍तरू‍ु‍ेप्रज्ाजलत, ुुरजक्षत‍और‍जीांत‍रखा‍जाएगा। iv) परराून‍नेटाकव‍का‍केंद्र‍लबद‍ुूजने‍के‍नात,े एमएमटीएच‍के‍पाु‍ जमजश्रत‍ईपयजग‍के‍जाकाु‍के‍जलए‍ ूब‍के‍रूप‍में‍ईच्च‍क्षमता‍ूजगी। v) अनंद‍जाूार-कड़कड़डूमा, कश्मीरी‍गेट‍और‍जनजामुद्दीन-ुराय‍काल‍े खां‍नामक‍तीन‍स्ट्थानों‍कज‍ मल्टी-मजडल‍रांजजट‍ूब‍(एमएमटीएच) के‍रूप‍म‍ें जाकजुत‍दकया‍जाएगा।‍दद.जा.प्रा.‍या‍ऄन्य‍ ुंबंजधत‍एजेंजुयााँ‍भजाष्य‍में‍एमएमटीएच के‍रूप‍म‍ें जाकजुत‍दकए‍जान‍े ााल‍े ऄन्य‍ऐु‍े स्ट्थानों‍की‍ पूचान‍कर‍ुकती‍ू।ैं 10.4.4 ुभी‍स्ट्टेिनों‍पर‍मल्टी‍मजडल‍आंटीग्रिे न‍(एमएमअइ):‍ददल्ली‍में‍पारगमन‍स्ट्‍टेिनों‍(मेरज, अरअरटीएु, रेला‍े स्ट्टेिन, ररग‍रेल)‍और‍प्रमुख‍बु‍टर्नमनलों‍पर‍जाजभन्न‍ुाधनों‍में‍ुूज‍एकीकरण‍कज‍ुुगम‍बनाया‍ जाए।72 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] i) एमएमअइ‍यजजनाओ‍कज, प,दल‍यात्री‍/‍ुाआदकल‍चलान‍े की‍ुुजाधाओं‍ुजूत‍कुिल‍यातायात‍और‍ यात्री‍फ,लाा‍के‍जलए‍ुंबंजधत‍पारगमन‍एजेंजुयों‍द्वारा‍त,यार‍और‍कायावजन्ात‍दकया‍जाएगा। ii) ुभी‍स्ट्थानों‍पर‍जनम्नजलजखत‍न्यूनतम‍ुुजाधाएाँ‍प्रदान‍की‍जाएंगी: क) प्रत्येक‍उंचाइ‍लबद‍ु के‍100‍मीटर‍के‍ऄन्दर:‍प,दल‍यात्री‍जस्ट्पल‍ओार‍प्‍लाजा, जाक्रय‍क्षेत्र,‍ ुाआदकल‍पार्ककग‍और‍रेंरटग‍स्ट्टेिन। ख) उाँचाइ‍जबन्दओंु ‍के‍केन्द्रक‍के‍300‍मी.‍तक:‍बु‍स्ट्टॉप, अइपीटी‍स्ट्टैंड, जनजी‍कारों‍के‍जलए‍ जपक-ऄप/ड्रॉप‍लजकेिन‍या‍ऑन-जडमांड‍अइपीटी। ग) उंचाइ‍जबन्दओंु ‍के‍केन्द्रक‍के‍500‍मी‍तक:‍एुएुअइ2‍और‍ुड़क‍जडजाआन‍जाजनयमों‍म‍ें ददए‍गए‍मानदडं ों‍के‍ऄनुुार,‍ुाावजजनक‍पार्ककग‍स्ट्थल‍(पाकव‍एण्‍ड‍राआड‍की‍ुुजाधाएाँ)‍और‍ ुाावजजनक‍ुुजाधाएं।‍जाजभन्न‍ुाधनों‍के‍जलए‍पार्ककग‍स्ट्थल‍ईपयजगकताव‍के‍प्रजफाआल‍और‍ ुंलग्न‍गजतजाजधयााँ/भूजम‍ईपयजग‍पर‍अधाररत‍ूोंगी।‍ईदाूरण‍के‍जलए, ि,जक्षक‍केंद्रों‍और‍ औद्यजजगक‍क्षेत्रों‍के‍जनकटाती‍मेरज‍स्ट्टेिनों‍में‍ुाआदकलों‍और‍दज‍पजूया‍ााूनों‍के‍जलए‍ ऄजधक‍इुीएु‍अांरटत‍ूोंगे। iii) ुंबंजधत‍भू-स्ट्‍ाामी‍एजेंजुयों‍द्वारा‍एमएमअइ‍यजजना कज‍लाग‍ू करने‍के‍जलए‍ुमुजचत‍भूजम‍ईपलब्ध‍ कराइ‍जाएगी। iv) ुभी‍नए‍पारगमन‍स्ट्टेिनों‍और‍एमएमटीएच के‍जलए, एमएमअइ‍का‍जनयजजन‍और‍दक्रयान्ान‍ जडजाआन‍के‍एक‍भाग‍के‍रूप‍म‍ेंदकया‍जाएगा। 10.4.5 एमएमअइ‍कज‍ुगु म‍बनान‍ेके‍जलए‍प्रौद्यजजगकी‍अधाररत‍ूस्ट्तक्षपे : i) एक‍ुाधन‍ुे‍दुू रे‍ुाधन‍की‍ओर‍ुूज‍स्ट्थानांतरण‍करने‍के‍जलए‍जाजभन्न‍ुाधनों‍का‍ऐप-अधाररत‍ एकीकरण‍मूत्त्ापूण‍व ूजगा।‍परराून‍जाभाग, जीएनुीटीडी‍ईपलब्ध‍मागों‍के‍जाकल्पों,‍ईपलब्ध‍ ुाधनों‍और‍ईनके‍ुंबद्ध‍दकराए, अाृजि, ऄनुमाजनत‍यात्रा‍ुमय, अदद‍की‍ाास्ट्तजाक‍ुमय‍की‍ जानकारी‍ कज‍ ुजम्मजलत‍ करते‍ ुएए‍ एक‍ स्ट्माट‍व मजजबजलटी‍ ऐप‍ जाकजुत‍ कर‍ ुकता‍ ू।, ‍ स्ट्माटव‍ मजजबजलटी‍ऐप‍कज‍िूर‍के‍जलए‍जाकजुत‍अइटीएमएु के‍ुाथ‍एकीकृत‍दकया‍जाएगा‍(देख:ें‍ MOB1)। ii) रेला‍े और‍बु‍परराून‍ज,ु‍े प्रमुख‍ुाधनों‍कज‍ुजम्मजलत‍करते‍ुएए,‍एक‍एकीकृत‍रटकरटग‍प्रणाली‍ या‍स्ट्माटव‍मजजबजलटी‍काड‍व का‍दक्रयान्ान‍दकया‍जाएगा।‍एकीकरण‍के‍जलए,‍अइपीटी, ऑन-जडमांड‍ क,ब‍अदद‍ज,ुे‍ऄन्य‍ुाझा‍ुाधनों‍पर‍भी‍जाचार‍दकया‍जा‍ुकता‍ू।, iii) जाजभन्न‍जनजी‍ुेाा‍प्रदाताओं‍और‍पारगमन‍एजेंजुयों‍के‍बीच‍ुाझेदारी‍की‍मांग‍करते‍ुएए‍एक‍ ुामान्य‍दकराया‍प्रबंधन‍प्रणाली‍जाकजुत‍की‍जा‍ुकती‍ू।, ‍आुुे‍ईन‍ईपयजगकताओंव ‍कज‍और‍ ऄजधक‍प्रजत्ुाून‍राजि‍और‍दकराए‍में‍छूट‍की‍ुुजाधा‍जमल‍ुकती‍ू‍, जज‍एक‍परराून‍ुाधन‍ु‍े दुू रे‍परराून‍ुाधन‍की‍ओर‍जाते‍ू।ैं 10.5 जनजी‍परराून‍कज‍ूतजत्ुाजूत‍करना 10.5.1 परराून‍के‍जनजी‍ुाधनों‍कज‍ूतजत्ुाजूत‍दकये‍जाने‍पर‍केंदद्रत‍करठन‍जनयामक‍कायवनीजतयों‍के‍ुाथ‍ ुाझा‍तौर-तरीकों‍के‍ईपयजग‍कज‍बढ़ाने‍पर‍लजक्षत‍जाजभन्न‍क़दमों‍कज‍परू क‍बनाना‍मूत्त्ापणू व‍ूजगा।‍यू‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 73 यजजना‍जनम्नजलजखत‍तीन‍प्रमुख‍कायवनीजतयों‍का‍प्रस्ट्ताा‍दते ी‍ू,, जजनका‍ईद्देश्य‍जनजी‍ााूनों‍के‍ईपयजग‍ पर‍ऄंकुि‍लगाना‍ू।, 10.5.2 कंजुे न‍प्राआलुग:‍र,दफक‍पुजलु‍के‍परामिव‍ुे‍ुड़कों‍का‍स्ट्ााजमत्ा‍रखने‍ााली‍एजेंजुयााँ‍िूर‍के‍जाजिष्ट‍ क्षेत्रों‍कज‍कंजेिन‍प्राआलुग‍क्षत्रे ‍के‍रूप‍में‍ऄजधुूजचत‍करेंगी।‍आनमें‍ुजम्मजलत‍ूज‍ुकती‍ू:,‍टीओडी‍ नजड्ु (देखें: डीइाी4), ्ापार‍प्रजत्ुाून‍(देख:ें डीइाी3), चारदीाारी‍िूर‍जाराुत‍जजन‍(देख:ें‍ एचुीपी2) और‍ुीबीडी‍(देख:ें ‍इुीओ)।‍अरएफअइडी‍ट,लगग‍अदद‍के‍रूप‍म‍ें तकनीक‍का‍ईपयजग‍ ुंबंजधत‍एजेंजुयों‍द्वारा‍कंजेिन‍प्राआलुग‍के‍प्रबंधन‍के‍जलए‍भी‍दकया‍जा‍ुकता‍ू।, 10.5.3 पार्ककग‍मागं ‍का‍प्रबधं न:‍कायव‍स्ट्थलों,‍मनजरंजन‍या‍ुांस्ट्कृजतक‍केन्द्रों,‍बाजारों‍अदद‍में‍ुाावजजनक‍ पार्ककग‍की‍ईपलब्धता‍पर‍रजक‍जनजी‍यात्राओं‍के‍जलए‍एक‍प्रमुख‍बाधा‍बन‍ुकती‍ू।, ‍पार्ककग‍जनयमों‍ कज‍कड़ाइ‍ु‍े लाग‍ू करने‍के‍ुाथ‍जनम्नजलजखत‍कायवनीजतयों‍का‍दक्रयान्ान‍एक‍मांग‍प्रबंधन‍ईपकरण‍के‍ रूप‍म‍ेंपार्ककग‍का‍ईपयजग‍करते‍ुएए‍दकया‍जाएगा: i) दकुी‍ क्षेत्र‍ के‍ ऄंदर‍ ुाावजजनक‍ पार्ककग‍ (ऑन‍ स्ट्‍रीट‍ और‍ ऑफ‍ स्ट्‍रीट)‍ की‍ अपूर्नत‍ ईुके‍ ुाावजजनक‍परराून‍ुुगम्यता‍स्ट्तर‍(पीटीएएल) के‍ुाथ‍जड़ु ी‍ूजगी।‍ईच्च‍पीटीएएल ााले‍क्षेत्रों‍ में‍ुाावजजनक‍पार्ककग‍की‍अपूर्नत‍कम‍ूजगी‍(देख:ें‍MOB4)। ii) पार्ककग‍िल्ु क‍का‍ईपयजग‍जनजी‍परराून‍ईपयजग‍कज‍ूतजत्ुाजूत‍करन‍े के‍जलए‍एक‍ुाधन‍के‍ रूप‍म‍ें दकया‍जाएगा।‍्स्ट्त‍और‍ऄ्स्ट्त‍ऄाजध‍के‍दौरान,‍ऑन‍स्ट्‍रीट‍और‍ऑफ‍स्ट्‍रीट‍पार्ककग‍ के‍जलए‍डायनेजमक‍प्राआलुग‍(ईच्च‍पार्ककग‍िल्ु क‍के‍मा्यम‍ुे)‍का‍ईपयजग‍ईच्च‍पीटीएएल‍ और/या‍ईच्च‍ााूनों‍के‍फुटफॉल‍के‍ुाथ‍कम‍भीड़‍ााले‍क्षेत्रों‍में‍दकया‍जाना‍चाजूए। iii) पद, ल‍चलन‍े ाालों‍और‍ुाआदकल‍चालकों‍कज‍प्राथजमकता‍दने ा:‍र,दफक‍पुजलु‍के‍ुाथ‍ुमन्ाय‍ करके‍ुम्बंजधत‍एजेंजुयााँ‍‘केाल‍याजत्रयों‍के‍जलए’‍क्षेत्रों‍के‍रूप‍म‍ें ईच्च‍पीटीएएल‍स्ट्तरों‍के‍ुाथ,‍ भारी‍अााजाूी‍ााल े जाजिष्ट‍क्षेत्रों‍ज,ु‍े दक‍पयवटक‍अकीणव ‍केंद्र, बाजार‍अदद‍की‍पूचान‍ करेंगी।‍जाजिष्ट‍ुमय‍ऄाजध‍के‍जलए‍ुड़कों‍कज‍पूरी‍तरू‍ुे‍प,दल‍याजत्रयों‍के‍जलए‍जनर्ददष्ट‍ क्षेत्रों‍में‍पररार्नतत‍करने‍के‍जलए ुामररक‍िूरीकरण ईपायज‍कज‍प्रजत्ुाजूत‍दकया‍जाना‍ चाजूए‍तादक‍ुमग्र‍यातायात‍अााजाूी‍बाजधत‍न‍ूज‍ुके।‍(देखें:‍MOB3) --- x --- x ---- x --- x ---74 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ऄ्याय कजड 11.0 ददल्ली‍कज‍पद, ल‍चलन‍ेऔर‍ुाआदकल‍चलान‍ेके‍ऄनकु ूल‍बनाना MOB3 11.1.1 ददल्ली‍की‍ईच्च‍ुदक्रय‍यात्रा‍ुंभााना‍का‍लाभ‍ुदक्रय‍यात्रा‍चुनने‍ााले‍लजगों‍द्वारा‍ईठाये‍जाने‍और‍बढ़ाये‍जाने‍ की‍अाश्यकता‍ू,, ‍जज‍ना‍केाल‍एक‍दकफायती‍गजतिीलता‍के‍जाकल्प‍के‍रूप‍में‍ूजगी, बजल्क‍एक‍ऐुे‍रूप‍में‍भी‍ ूजगी‍जज‍्जि यों‍और‍िूर‍के‍जलए‍अरामदायक‍एां‍ुुरजक्षत‍ूज‍और‍स्ट्ाास्ट््य‍एां‍पयावारणीय‍लाभों‍में‍ाृजद्ध‍ करें। 11.1.2 ातवमान‍नेटाकव‍कज‍िूर‍म‍ें ग्रीन-ब्लू‍नेटाकों‍(देख:ें ‍इएनाी2)‍का‍ईपयजग‍करते‍ुएए‍प्राथजमकता‍के‍अधार‍पर‍ ा,कजल्पक‍ुदक्रय‍यात्रा‍मागों‍के‍रूप‍में‍ुुदढ़ृ ‍दकये‍जाने‍की‍अाश्यकता‍ू,, जजुे‍छजटी‍और‍लंबी‍दरू रयों‍के‍ जलए‍पद, ल‍याजत्रयों‍और‍ुाआदकल‍चालकों‍के‍जलए‍ुुरजक्षत‍नटे ाकव‍बनाकर‍और‍ुदक्रय‍यात्रा‍के‍लाभों‍के‍बारे‍ में‍जन-जागरूकता‍कज‍बढ़ा‍कर‍दकया‍जा‍ुकता‍ू।, ‍ुदक्रय‍यात्रा‍कज‍प्रजत्ुाजूत‍करने‍के‍जलए‍कायवनीजतयों‍का‍ कायावन्ायन‍जनम्नजलजखत‍ुुजाधाएाँ‍प्रदान‍करेगा: i) ुदक्रय‍यात्रा‍के‍जाकल्पों‍और‍ऄाुरों‍के‍ुाथ‍प्रदीू ण‍मुि ‍और‍ुुरजक्षत‍गजतिीलता‍तक‍पुएचं ‍म‍ें ाृजद्ध। ii) ददल्ली‍म‍ेंुदक्रय‍यात्रा‍(प,दल‍चलना‍और‍ुाआदकल‍चलाना)‍के‍ऄनुपात‍म‍ेंाृजद्ध। 11.2 ुदक्रय‍यात्रा‍कज‍प्रजत्ुाजूत‍करन‍ेके‍जलए‍ुड़क‍(स्ट्रीट)‍जडजाआन 11.2.1 ुदक्रय‍यात्रा‍कज‍िूरी‍पयावारण‍की‍रूपरेखा‍बनाकर‍प्रजत्ुाजूत‍दकया‍जाएगा‍जूााँ‍पर‍ऄजधक‍लजग‍आुे ‘गंत्‍यात्रा’,‍ऄथावत‍कायवस्ट्थल,‍स्ट्कूल,‍ईपाुनास्ट्थल,‍दकु ान,‍जथयेटर,‍ुाावजजनक‍परराून‍अदद‍के‍ुाथ- ुाथ,‍‘मनजरंजनात्मक‍यात्रा’,‍ऄथावत‍अराम‍या‍्ायाम‍दजनों‍के‍जलए‍एक‍पुंदीदा‍ुाधन‍के‍रूप‍म‍ें चुनत‍े ू।ैं 11.2.2 प,दल‍याजत्रयों‍एां‍ुाआदकल‍चालकों‍के‍जलए‍बाधा-मुि ‍अााजाूी‍कज‍प्राथजमकता‍देकर‍ुदक्रय‍यात्रा‍के‍ जलए‍पाररजस्ट्थजतकी‍तंत्र‍का‍जनमावण‍करन‍े के‍जलए‍आंफ्रास्ट्रक्चर‍का‍प्रााधान‍करके‍ुभी‍अय‍ु ागों‍और‍ क्षमताओ‍ाँ ााल‍े ईपयजगकताओंव ‍के‍जलए‍ुड़क‍स्ट्थान‍के‍ुमान‍जातरण‍और‍ुरु जक्षत‍गजतिीलता‍कज‍ ुुजनजित‍करन‍े के‍जलए‍ुड़कों‍कज‍जडजाआन‍दकया‍जाएगा।‍पद, ल‍चलन‍े ाालों‍और‍ुाआदकल‍चालकों‍कज‍ बेूतर‍ुेाा‍प्रदान‍करन‍े के‍जलए‍ातवमान‍ुड़कों‍कज‍ुंार्नधत‍रूप‍में‍पुनःुंयजजजत‍दकया‍जाएगा।‍प,दल‍ यात्री‍मागों /‍फुटपाथों‍कज‍नए‍जाकाु‍क्षेत्रों‍में‍ऄजनाायव‍रूप‍ुे‍ईपलब्ध‍कराया‍जाएगा। 11.2.3 जनम्नजलजखत‍मुख्य‍घटकों‍कज‍ुड़कों‍के‍ऄनुक्रम‍कज‍्यान‍म‍ेंरखते‍ुएए‍ुभी‍नए‍ुड़क‍ऄाुंरचना‍जडजाआन‍ के‍एक‍भाग‍के‍रूप‍म‍ेंऔर‍ातमव ान‍ुड़कों‍में‍ुधु ार‍करने‍के‍जलए‍ुजम्मजलत‍दकया‍जाएगा: 11.2.3.1 ऄपेक्षाकृत‍ छजटे‍ और‍ अरामदायक‍ मागव‍ प्रदान‍ करने‍ के‍ जलए‍ ऄारजध‍ रजूत‍और‍ ऄनारत‍ एनएमटी‍नेटाकव‍ऄाुंरचना,‍ज,ुे‍दक‍फुटपाथ, ुाआदकल‍र,क‍अदद‍का‍प्रााधान‍दकया‍जाएगा। 11.2.3.2 ुदक्रय‍यात्रा‍जािेीताओं‍के‍प,टनव‍के‍ऄनुुार, मजटर‍चाजलत‍ााूनों‍के‍ुाथ‍प,दल‍चलने‍ाालों‍या‍ ुाआदकल‍चालकों‍के‍टकरान‍े के‍लबदओंु ‍कज‍जनम्नजलजखत‍ऄाुंरचना‍के‍प्रााधानों‍के‍मा्यम‍ुे‍ कम‍दकया‍जाएगा: i) जूां‍तक‍ुंभा‍ूज,‍प,दल‍और‍ुाआदकल‍क्रॉलुग‍एट-ग्रेड‍ूजगी।‍क,ररजाेज‍म‍ें यातायात‍की‍ गजत‍कज‍कम‍करन‍े ााल‍ेतत्ा‍ुजम्मजलत‍ूोंगे।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 75 ii) ुुरजक्षत‍और‍जीांत‍पयावारण‍ुुजनजित‍करन‍े के‍जलए ुबाे‍या‍फुट‍ओार‍जब्रजों‍कज‍ ्ााुाजयक‍गजतजाजध, लजक‍कला, ुड़क‍प्रदिनव ‍अदद‍के‍मा्यम‍ु‍े क्रॉु-प्रजग्राम्ड‍दकया‍ जाएगा। iii) प,दल‍चलने‍ाालों,‍व्ूीलचेयर‍का‍ईपयजग‍करने‍ाालों‍और‍ुाआदकल‍चालकों‍के‍जलए‍ ुुगम‍ईपयजग‍कज‍ुुजनजित‍करने‍के‍जलए‍ग्रेड‍ुेपरेरटड‍क्रालुगों‍पर‍प,दल‍चलने‍ाालों‍के‍ जलए‍जुग्नलों‍की‍स्ट्थापना‍कज‍प्राथजमकता‍दी‍जाएगी‍l‍पेजलकन‍क्रॉलुग‍प्रणाली‍कज‍ जािेीकर‍बच्चों, बुजुगों‍और‍दद्ांगों‍के‍जलए‍स्ट्कूलों‍और‍ऄन्य‍प्रमुख‍प,दल‍यात्री‍क्रॉलुगों‍ के‍पाु‍स्ट्थाजपत‍दकया‍जाएगा। 11.2.3.3 स्ट्रीट‍फनीचर,‍ऄथावत‍बेंच‍और‍ब,ठन‍े की‍ऄन्य‍्ास्ट्था, कचरे‍के‍जडब्ब,े ुाआनेज, ुाावजजनक‍ ईपयजजगताएं, ज,ुे‍दक‍जाश्राम-कक्ष,‍जििु‍देखभाल‍कक्ष, चेंलजग‍रूम‍और‍जनयजमत‍दरू ी‍के‍ ऄंतरालों‍पर‍पेयजल‍की‍टोंटी‍अदद‍का‍प्रााधान‍दकया‍जाएगा। 11.2.3.4 बुए-ईपयजजगता‍जजन‍का‍जनधावरण‍और‍ईुका‍स्ट्थान‍जनधावरण‍दकया‍जाएगा‍तादक‍स्ट्रीट‍ाेंडु‍व और‍दकओस्ट्क,‍लजक‍कला‍के‍स्ट्थान‍और‍ऄन्य‍ुााजवजनक‍गजतजाजधयों‍कज‍ुमायजजजत‍दकया‍जा‍ ुके‍जजुुे‍स्ट्रीट‍लाइफ‍और‍गजतजाजध‍के‍जलए‍ुदक्रय‍और‍ुौंदयवपूणव‍अकीवक‍स्ट्थल‍बनाए‍जा‍ ुके। 11.2.3.5 प,दल‍चलन‍े ाालों‍और‍ुाआदकल‍चालकों‍की‍ुरु क्षा‍के‍जलए‍ददन‍के‍ुमय‍बेूतर‍छाया‍और‍रात‍ के‍ुमय‍प्रकाि‍की‍्ास्ट्था‍जनम्नानुुार‍की‍जाएगीः i) ईपयुि ‍छाया‍प्रदान‍करने‍ााल‍ेऔर‍दिे ी‍प्रजाजतयों‍के‍प्रदीू ण‍कज‍जनस्ट्पंद‍करने‍ााले‍ाृक्षों‍ और‍ऄन्य‍भूदश्ृ य‍तत्ाों‍के‍ुाथ-ुाथ,‍प्रदीू ण-मुि ‍जािेीताएाँ,‍ज,ुे‍दक‍पानी‍ुजखने‍ााली‍ ुतू, बायज-स्ट्ा,ल अदद। ii) ुुरक्षा‍और‍ुंरक्षा‍ुुजनजित‍करन‍े के‍जलए‍पयावप्त‍ुड़क‍लाआटलनग‍और‍प्रकाि-्ास्ट्था।‍ ्ापक‍प्रकाि‍के‍ऄजतररि ,‍प,दल‍चलन‍े ाालों‍के‍जलए‍स्ट्तरीय‍प्रकाि‍्ास्ट्था‍की‍ प्राथजमकता‍का‍ुमााेि। iii) आंटर-मजडल‍जिफ्टों‍में‍ाृजद्ध‍करने‍के‍जलए‍ुाआदकल‍पार्ककग‍के‍ुाथ‍बु‍िेल्टर, जनजी‍ ााूनों‍के‍जलए‍जपक-ऄप‍और‍ड्रॉप-ऑफ‍ब,े ट,क्ुी‍और‍अइपीटी। 11.2.4 ुभी‍प,दल‍चलन‍े ाालों‍और‍ुाआदकल‍चालकों‍ुंबंधी‍ऄाुंरचनाए‍ं और‍ुड़कों‍का‍ुुधार‍ुड़क‍जडजाआन‍ जाजनयम‍(देख:ें ‍ऄनलु ग्नक‍7) में‍जनधावररत‍मानकों‍और‍ददिाजनदेिों‍पर‍अधाररत‍ूोंगे।‍बुजगु ों, बच्चों‍और‍ दद्ांग‍्जि यों‍के‍जलए‍पुएचं ‍कज‍ुुगम‍बनाने‍के‍जलए‍अााुन‍और‍िूरी‍कायव‍मंत्रालय‍(एमओएचयूए)‍ के‍दद्ांग‍्जि यों‍और‍बुजगु ों के‍जलए‍बाधा‍मुि ‍जनर्नमत‍पयावारण 2016‍के‍जलए‍ुामंजस्ट्यपूण‍व ददिाजनदेिों‍और‍स्ट्थल‍मानकों‍का‍ऄनुपालन ुुजनजित‍दकया‍जाएगा। 11.3 ुदक्रय‍यात्रा‍क्षत्रे ‍(एटीए)‍और‍ाॉक‍प्लान 11.3.1 ुदक्रय‍यात्रा‍क्षेत्रों‍की‍पूचान‍ुंबंजधत‍एजेंजुयों‍द्वारा‍िूर‍म‍ें ईच्च‍गजतजाजध‍केंद्रों‍के‍अुपाु‍की‍ जाएगी‍और‍प,दल‍चलन‍े ाालों‍और‍ुाआदकल‍चालकों‍ुंबंधी‍ऄाुंरचना‍में‍ुुधार‍लाने‍के‍जलए‍आन‍क्षेत्रों‍ में‍ाॉक‍प्लान‍त,यार‍दकया‍जाएगा‍और‍ईुका‍कायावन्ान‍दकया‍जाएगा।76 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 11.3.2 दकुी‍जाजिष्ट‍गंत्‍नजड,‍ज,ुे‍दक‍ धरजूर‍पररुर,‍बाज़ार,‍ातवमान‍अााुीय‍कॉलजनी‍अदद‍के‍ अुपाु,‍400-500‍मीटर‍(5-10‍जमनट‍की‍प,दल‍दरू ी)‍के‍दायरे‍के‍ऄन्दर‍जस्ट्थत‍कम‍ुे‍कम‍एक‍क्षेत्र‍के‍ जलए‍बनाया‍जाएगा। ाॉक‍प्लान‍के‍ऄतं गतव ,‍क्षेत्र‍का‍ाास्ट्तजाक‍पररुीमन‍पडे -िेड‍और/या‍ाांजछत‍ लाआनों‍पर‍अधाररत‍ूजगा।‍ुबं ंजधत‍एजेंजुयााँ‍यातायात‍प्रबंधन, एमएमअइ, स्ट्टेिन‍फ,लाा‍(जडस्ट्पुवल)‍ यजजनाएाँ‍अदद‍के‍जलए‍ऄपनी‍यजजनाओं‍के‍ुाथ‍आन‍यजजनाओं‍कज‍एकीकृत‍करेंगी। 11.3.3 लैंड-पूललग‍क्षेत्रों के‍ऄंतगतव ,‍ुभी‍नए‍जाकाु/पररयजजनाओं, टीओडी‍और‍पनु रूद्धार‍यजजनाओं,‍ऄन्य‍ जािेी‍पररयजजनाओं‍कज‍एटीए‍के‍रूप‍में‍माना‍जाएगा‍और‍लअे ईट‍के‍ऄनुमजदन‍के‍जलए‍ाॉक‍यजजनाओं‍ की‍त,यारी‍की‍अाश्यकता‍ऄजनाायव‍रूप‍ुे‍ूजगी। 11.3.4 अंजिक‍या‍पूणव‍प,दल‍यात्रा‍के‍जलए‍ुंबंजधत‍एजेंजुयों‍द्वारा‍गून‍खुदरा‍्ााुाजयक‍गजतजाजध‍या‍ ऄपाादस्ट्‍ारूप‍रूप‍ु‍े ईच्च‍पद, ल‍यात्री‍अााजाूी, ुाप्ताजूक‍बाज़ार‍और‍नाआट‍आकजनजमी‍के‍जलए‍ जचजन्ूत‍क्षेत्रों‍के‍ुाथ‍जाद्यमान‍क्षेत्रों‍की‍पूचान‍एटीए‍के‍रूप‍म‍ें की‍जा‍ुकती‍ू‍, (देख:ें‍इुीओ‍और‍ एचुीपी1)l 11.3.5 ाॉक‍ प्लान‍ कज‍ स्ट्थानीय‍ जनकायों‍ या‍ अरडब्ल्यूए‍ और‍ ऄन्य‍ जूतधारकों‍ द्वारा‍ मौजदू ा‍ अााुीय‍ कॉलजजनयों, बाजारों‍अदद‍के‍जलए‍भी‍त,यार‍दकया‍जा‍ुकता‍ू।, ‍ये‍क्षेत्र‍पार्ककग‍प्रबंधन‍क्षेत्रों‍या‍ग्रीन-ब्ल‍ू आंफ्रास्ट्रक्चर/‍नेटाकव‍का‍जनमाणव ‍करने‍के‍जलए‍दकुी‍प्रस्ट्ताा‍के‍ुाथ‍ललक‍दकए‍जायेंगे। 11.3.6 िूर‍भर‍के‍नेटाकों‍का‍ऄनारत‍जनमावण‍करने‍के‍जलए‍ुभी‍एटीए‍कज‍प्रमुख‍ुड़कों‍(ुमर्नपत‍ुाआदकल‍ र,कों‍और‍फुटपाथों‍ुजूत)‍के‍ुाथ‍जजड़ा‍जाएगा। 11.3.7 ाॉकेजबजलटी‍जाजनयमों‍में‍ाॉक‍प्लान‍के‍जलए‍‍जचजननत‍क्षेत्रों‍का‍जाकाु‍और‍दक्रयान्ायन‍प्राथजमकता‍के‍ अधार‍पर‍दकया‍जाएगा। 11.3.8 ुंबंजधत‍एजेंजुयों‍द्वारा‍ुमय-ुमय‍पर‍ईन‍एटीए‍की‍पूचान‍की‍जा‍ुकती‍ू , जजुके‍जलए‍ाॉक‍प्लान‍ कज‍त,यार‍और‍कायावजन्ात‍दकया‍जाएगा। 11.4 िूर‍स्ट्तरीय‍ुदक्रय‍यात्रा‍नटे ाक्ु व 11.4.1 30‍मी. ुे‍ऄजधक‍अरओडब्ल्य‍ू की‍ुड़कों‍के‍जलए‍लगातार‍ुदक्रय‍यात्रा‍नेटाकव‍स्ट्थाजपत‍दकये‍जायेंग।े ‍ ुाआदकल‍ुाारों, प,दल‍याजत्रयों‍के‍ातवमान‍या‍प्रत्याजित‍ईच्च‍भाग‍ााले‍कुछ‍जचजननत‍मागों‍और‍जाजभन्न‍ गजतजाजध‍केंद्रों‍कज‍जजड़ने‍ााले‍ईन‍मागों‍का‍जाकाु‍कायवनीजतक‍ुदक्रय‍यात्रा‍गजलयारों‍के‍रूप‍में‍दकया‍ जाएगा। 11.4.2 ुाआकललग‍राजमाग:व‍िूर‍भर‍में‍लंबी‍दरू ी‍की‍ुदक्रय‍यात्रा‍कज‍ुुगम‍बनाने‍के‍जलए‍कुछ‍गजलयारों‍कज‍ ुाआदकल‍राजमागव‍के‍रूप‍म‍ेंजचजननत‍और‍जाकजुत‍दकया‍जाएगा। 11.4.3 ग्रीन‍मजजबजलटी‍कॉररडजर:‍ये‍प,दल‍याजत्रयों‍और‍ुाआदकल‍चालकों‍के‍‍जलए‍जाजिष्ट‍मागव‍ू‍ैं जजन्ू‍ें प्राकृजतक‍नालों‍और‍यमनु ा‍नदी‍(देख:ें ‍इएनाी2) के‍ुाथ‍िूर‍स्ट्तर‍पर‍ुमर्नपत‍गजलयारों‍के‍रूप‍म‍ें बनाए‍जाने‍का‍प्रस्ट्ताा‍ू।, ‍आुके‍ऄजतररि , आन‍गजलयारों‍के‍अुपाु‍ुांस्ट्कृजतक‍केन्द्रों‍या‍कायवनीजतक‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 77 ुदक्रय‍गजलयारों‍कज‍जजड़ने‍ााले‍ये‍गजलयारे‍प,दल‍चलने‍ाालों‍और‍ुाआदकल‍चालकों‍कज‍छजटे‍माग‍व ईपलब्ध‍कराएगाँ े‍और‍ईनकी‍ुरु क्षा‍ुुजनजित‍करेंगे। 11.5 ुदक्रय‍यात्रा‍कज‍प्रजत्ुाजूत‍करन‍ेके‍जलए‍ऄन्य‍कायनव ीजतया ाँ 11.5.1 ुजु नयजजजत‍िूरीकरण:‍कायावन्ायन‍एजेंजुयां‍गजलयों‍कज‍अरजक्षत‍करके‍और‍ुड़कों‍के‍फ,लाा‍कज‍पद, ल‍ याजत्रयों‍के‍ऄनुकूल‍बनाकर‍प,दल‍चलन‍े ाालों‍और‍एनएमटी‍गजतजाजध‍कज‍प्राथजमकता‍दने े‍के‍जलए‍ुड़क‍ के‍एक‍भाग‍कज‍ऄस्ट्थायी‍रूप‍ुे‍पुनःुंयजजजत‍करन‍े ूते ,ु ‍ुुजनयजजजत‍िूरीकरण‍या‍पॉप-ऄप‍िूरीकरण‍ का‍प्रयजग‍कर‍ुकते‍ू‍ैं l‍यू‍ुंस्ट्तुजत‍की‍जाती‍ू‍, दक‍प,दल‍याजत्रयों‍और/या‍ुाआदकल‍चालकों‍ुंबंधी‍ ऄाुंरचना‍का‍जनमावण‍करन‍े के‍जलए‍ुभी‍प्रस्ट्तााों‍की‍्ाूायवता‍का‍परीक्षण‍स्ट्थायी‍प्रकृजत‍के‍ुड़कों‍ के‍पुनःुंयजजन‍कायों‍ुे‍पूाव‍जमीन‍पर‍कर‍लने ा‍चाजूए। 11.5.2 ुक्ष्ू म-गजतिीलता:‍ब,टरी‍चाजलत‍इ-बाइक्ु‍और‍ऄन्य‍प्रदीू ण-मुि ‍गजतिीलता‍के‍जाकल्पों‍कज‍प्रजत्ुाजूत‍ दकया‍जा‍ुकता‍ू।, ‍बुजुगों‍और‍चलन‍े में‍तकलीफ‍ााल‍े ्जि यों‍के‍जलए‍एटीए‍और‍कायनव ीजतक‍ुदक्रय‍ गजलयारों‍म‍ें ऐु‍े ााूनों‍के‍जलए‍पार्ककग‍प्रााधान‍और‍पीबीएु‍प्रणाजलयों‍कज‍प्रजत्ुाजूत‍दकया‍जाना‍ चाजूए। 11.5.3 नागररकों‍का‍जड़ु ाा:‍ुभी‍ुंबंजधत‍जाभाग‍/‍एजेंजुयााँ‍ुदक्रय‍यात्रा‍आंटराेन्िन्ु‍के‍जलए‍अम‍ुूमजत‍के‍ जनमावण‍ कज‍ बढ़ााा‍ देने‍ और‍ यात्रा‍ के‍ दौरान‍ ्ाूार‍ म‍ें बदलाा‍ कज‍ प्रेररत‍ करने‍ ूते ु‍ प्रस्ट्ताजात‍ पररयजजनाओं‍और‍यजजनाओं‍के‍जलए‍जागरूकता‍ऄजभयानों‍और‍ुाावजजनक‍जड़ु ाा‍की‍कायवनीजतयों‍की‍ रूपरेखा‍बना‍ुकती‍ू।ैं i) ुंबंजधत‍एजेंजुयााँ,‍स्ट्थानीय‍जनकाय‍अदद‍ुदक्रय‍यात्रा, यातायात‍जनयमों, जाजनयमों‍और‍जमु ावना, प,दल‍यात्री‍प्रथम‍जुद्धांत, अदद‍के‍लाभों‍के‍बारे‍में‍जागरूकता‍बढ़ाने‍के‍जलए‍स्ट्कूली‍बच्चों, मजूलाओं,‍बुजुगों‍और‍दद्ागं जनों‍ुजूत,‍जाजभन्न‍नागररक‍ुमूूों‍के‍जलए‍ुमर्नपत‍ऄजभयान‍चला‍ ुकती‍ू।ैं ii) बीमारी‍फ,लन‍े या‍मूामारी‍के‍ुमय‍ुामाजजक‍दरू ी‍कज‍ुुजनजित‍करन‍े के‍जलए‍ुदक्रय‍यात्रा‍कज‍ गजतिीलता‍जाकल्प‍के‍रूप‍म‍ेंभी‍प्रजत्ुाजूत‍दकया‍जा‍ुकता‍ू।, 11.5.4 ुदक्रय‍यात्रा‍के‍जलए‍प्रौद्यजजगकी‍(टेक्नजलॉजी)‍कज‍प्रयजग‍म‍ें लाना:‍प्रौद्यजजगकी‍और‍नेटार्ककग‍ुदक्रय‍यात्रा‍ कज‍प्रभााी‍रूप‍ुे‍ुक्षम‍बना‍ुकती‍ू‍, और‍पद, ल‍याजत्रयों‍और‍ुाआदकल‍चालकों‍के‍ऄनभु ा‍और‍ुुरक्षा‍ कज‍बढ़ा‍ुकती‍ू:, i) प,दल‍चलने‍और‍ुाआदकल‍चलाने‍ूते ु‍मागों, यात्राओं, म,राथन, ूरे-भरे‍रास्ट्त,े ‍जाराुत‍के‍जचनन, ुाावजजनक‍ुुजाधा‍स्ट्थल,‍ाास्ट्तजाक‍ुमय‍की‍ईपलब्धता‍के‍ुाथ‍पीबीएु, लजकजप्रय‍गंत्ों‍/‍ भजजनालयों‍और‍अगामी‍ुांस्ट्कृजतक‍कायवक्रमों‍के‍बारे‍में‍जानकारी‍प्रदान‍करने‍के‍जलए‍ुंबंजधत‍ एजेंजुयों‍द्वारा‍स्ट्माटव‍एजप्लकेिन‍जाकजुत‍दकए‍जाएंगे।‍लजगों‍के‍जलए‍पद, ल‍चलने‍यजग्य‍और‍ ुाआदकल‍चलाने‍यजग्य‍मागों‍और‍क्षेत्रों‍तथा‍ररपजर्टटग‍ुे‍ुबं ंजधत‍मुद्दों‍का‍अंकलन‍करने‍के‍जलए‍ जािेी‍एप्लीकेिन‍जाकजुत‍दकए‍जा‍ुकते‍ू;ैं ii) नागररकों‍कज‍ाास्ट्तजाक‍ुमय‍की‍ाायु‍गुणािा‍की‍जानकारी‍प्रदान‍करने‍ूते ु‍्ापक‍ाायु‍गुणािा‍ ुूचकांक‍(एक्यूअइ)‍के अकलन‍के‍जलए‍र,दफक‍जुग्नल‍पर‍स्ट्माटव‍ुेंुर‍स्ट्थाजपत‍दकए‍जा‍ुकते‍ू;ैं iii) उजाव‍ईत्पन्न‍करन‍े ााली‍टाआलों‍का‍ईपयजग‍फुटपाथों‍और‍पक्के‍क्षेत्रों‍के‍जलए‍दकया‍जा‍ुकता‍ू।, ‍ उजाव‍(ुौर‍उजाव‍के‍ुाथ‍युजग्मत)‍का‍ईपयजग‍स्ट्रीट‍लाआटों‍कज‍प्रकाजित‍करने‍के‍ुाथ-ुाथ‍ब,ठने‍या‍ अराम‍करने‍ााले‍स्ट्थानों‍के‍जनकट‍मजबाआल‍या‍ऄन्य‍आलेक्रॉजनक‍ईपकरणों‍के‍जलए‍चार्मजग‍पॉआंट‍ प्रदान‍करने‍के‍जलए‍दकया‍जा‍ुकता‍ू;,78 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] iv) प,दल‍चलने‍ाालों‍और‍ुाआदकल‍चालकों‍की‍ुुरक्षा, यातायात‍जनयमों‍की‍ऄनपु ालना‍और‍स्ट्रीट‍ फनीचर‍की‍तजड़फजड़‍कज‍रजकन‍े के‍जलए‍ऄत्याधुजनक‍जनगरानी‍तकनीक‍का‍प्रयजग‍दकया‍जा‍ुकता‍ू‍, । --- x --- x ---- x --- x --- ऄ्याय कजड 12.0 ददल्ली‍म‍ेंपार्ककग‍प्रबधं न MOB4 12.1.1 कम‍काबवन‍मात्रा‍ााल‍े परराून‍ुाधनों‍ुे‍अााजाूी‍करना‍ददल्ली‍के‍जलए‍एक‍ऄजनाायव‍ितव‍ू।, ‍राष्ट्रीय‍ राजधानी‍क्षेत्र‍के‍जलए‍पयावारण‍प्रदीू ण‍(रजकथाम‍और‍जनयंत्रण)‍प्राजधकरण‍और‍राष्ट्रीय‍िूरी‍परराून‍ नीजत, 2006‍के‍ऄनुरूप‍तथा‍भूजम‍का‍ुाोिम‍ईपयजग‍करने‍के‍जलए, पार्ककग‍कायवनीजत‍में‍मौजूदा‍पार्ककग‍ की‍मांग‍प्रबंधन‍पर‍्यान‍केंदद्रत‍दकया‍जाएगा‍जजुमें‍पार्ककग‍ुुजाधाओं‍कज‍पुन:ुंगरठत‍दकया‍जाएगा‍और‍ ईनके‍ईपयजग‍कज‍बढ़ाया‍जाएगा।‍पार्ककग‍के‍प्रबंधन‍के‍जलए‍पार्ककग‍के‍जनयमों‍और‍जाजनयमों‍का‍ुख्त‍ ऄनपु ालन‍अाश्यक‍ूजगा‍और‍आुुे‍ुाावजजनक‍परराून‍और‍ुाझा‍परराून‍ुाधनों‍के‍पक्ष‍म‍ें पररातवन‍कज‍ प्रेरणा‍जमलगे ी।‍मास्ट्टर‍प्लान‍की‍पार्ककग‍कायवनीजत‍म‍ें ुााजव जनक‍और‍जनजी‍पार्ककग‍की‍ईपयुि ‍ईपलब्धता‍ की‍पररकल्पना‍की‍गइ‍ू,, जजुे‍ुाावजजनक‍परराून‍और‍ुाझा‍परराून‍ुाधनों‍की‍ईपलब्धता‍के‍स्ट्तर‍और‍ पार्ककग‍की‍ईपलब्धता‍के‍ुाथ‍्ाजस्ट्थत‍दकया‍जाता‍ू।, 12.2 िूर-्ापी‍पार्ककग‍कायनव ीजत‍के‍जलए‍ददिाजनदिे : जनम्नजलजखत‍ददिाजनदेि‍और‍कायवनीजतयां‍िूर‍म‍ेंपार्ककग‍की‍ुमग्र‍्ास्ट्था‍कज‍जनदेजित‍करेंगी: i. ‘ईपयजगकता‍व द्वारा‍भगु तान’‍का‍जुद्धातं :‍ुभी‍्जि गत‍मजटर‍ााूनों‍(पीएमाी) (एनएमटी कज‍ छजड़कर)‍के‍ईपयजगकतावओं‍कज‍ऄजधकृत‍पार्ककग‍ुुजाधाओं/स्ट्थानों/ुड़कों‍के‍ईपयजग‍के‍जलए‍भुगतान‍ करना‍ूजगा। ii. पार्ककग‍की‍ईपलब्धता‍कज‍यजु ि ुगं त‍बनाना:‍दकुी‍एक‍क्षेत्र‍जािेी‍के‍ऄदं र‍(ुड़क-पर‍और‍ुड़क‍ु‍े आतर)‍(ऑन-स्ट्रीट‍और‍ऑफ-स्ट्रीट)‍ुाावजजनक‍पार्ककग‍की‍ईपलब्धता‍और‍एक‍ईपयजग‍पररुर‍के‍ ऄंदर‍इुीएु‍ुंबंधी‍मानदंडों‍कज‍ुाावजजनक‍परराून‍पुएचं ‍स्ट्तर‍(पीटीएएल)‍और‍पार्ककग‍के‍ बुजनयादी‍ढांचे‍की‍ईपलब्धता‍के‍ऄनुुार‍युजि ुंगत‍बनाया‍जाएगा। iii. पार्ककग‍का‍मल्ू य‍जनधारव ण:‍पार्ककग‍िल्ु क‍का‍ईपयजग,‍ऑन-स्ट्रीट‍पार्ककग‍की‍मांग‍कज‍कम‍करने‍और‍ ऑफ-स्ट्रीट‍पार्ककग‍(जािेी‍रूप‍ुे-मल्टी‍ल,ाल‍कार‍पार्ककग-एमएलुीपी)‍के‍ईपयजग‍कज‍बढ़ाने‍के‍ जलए‍दकया‍जाएगा।‍भीड़भाड़‍ुंबंधी‍मूल्य‍जनधारव ण‍(कंजिे न‍प्राआलुग)‍(ऄजधक‍पार्ककग‍िुल्क‍ लगाकर)‍का‍ईपयजग‍ऄजधक‍ुाावजजनक‍परराून‍(पीटी)‍की‍पुएचं ‍ााले‍और/या‍ऄजधक‍ााूनों‍की‍ ुंख्या‍ााल‍े क्षेत्रों‍(्ााुाजयक‍क्षेत्रों, जमजश्रत-ईपयजग‍ुड़कों, कायव‍केंद्रों‍अदद)‍की‍भीड़‍कज‍कम‍ करने‍म‍ेंदकया‍जाएगा। iv. पार्ककग‍का‍ऄजधकतम‍ईपयजग:‍पार्ककग‍स्ट्थानों‍कज‍ुाझा‍ुुं ाधन‍मानकर‍पार्ककग‍ुुजाधाओं‍और‍ क,जप्टा‍ुमतुल्य‍कार‍स्ट्थान(इुीएु) का‍ऄजधकतम‍ईपयजग‍दकया‍जाएगा।‍पार्ककग‍की‍मांग‍की‍ ्ास्ट्था‍करने‍और‍पार्ककग‍कारजबार‍कज‍बढ़ाने‍ूते ु‍जाजभन्न‍ईपयजगों‍के‍जलए‍ऄतं रकाजलक‍्स्ट्त‍घंटों‍ का‍भी‍पता‍लगाया‍जा‍ुकता‍ू।, ‍म,केनाआज्ड‍स्ट्ट,क‍पार्ककग‍का‍ईपयजग‍करके‍ऑफ-स्ट्रीट‍पार्ककग‍ स्ट्थलों‍की‍पार्ककग‍क्षमता‍बढ़ाइ‍जा‍ुकती‍ू , v. ुभी‍परराून‍ुाधनों‍के‍जलए‍पार्ककग‍की‍पयाप्तव ‍्ास्ट्था:‍िूर‍में‍पार्ककग‍की‍अपूर्नत‍ूते ु‍न‍केाल‍ पीएमाी के‍ जलए‍ पार्ककग‍ मांग‍ पर‍ बजल्क‍ ऄन्य‍ ुाधन‍ ज,ुेदक‍ ईपयजगी‍ ुेााओं‍ ााले‍ और‍ अपातकालीन‍ााून, ुाझा‍ुाधन‍(अइपीटी, फीडर‍मजड, अदद) माल‍ााून,‍ुाआदकल‍अदद के‍ जलए‍पार्ककग‍मांग‍पर‍भी‍जाचार‍दकया‍जाएगा।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 79 12.3 पार्ककग‍प्रबधं न‍क्षत्रे ‍यजजना‍(पीएमएपी) 12.3.1 दकुी‍क्षेत्र/आलाके‍में‍पार्ककग‍की‍ईपलब्धता‍और/ऄथाा‍प्रबंधन‍के‍जलए‍ददल्ली‍पार्ककग‍स्ट्थल‍के‍रखरखाा‍ और‍प्रबंधन‍जनयम,‍2019‍के‍ऄनुरूप एक‍्ापक‍क्षेत्र-अधाररत‍दजृष्टकजण‍ऄपनाया‍जाएगा। 12.3.2 पार्ककग‍प्रबंधन‍क्षेत्रों‍(पीएमए)‍का‍मागं ‍प्रबंधन,‍ईपलब्ध‍पार्ककग‍कज‍जाजनयजमत‍करने और‍आुुे‍जुड़ी‍ अर्नथक‍लागत‍कज‍कम‍करन‍े ‍ूते ु‍पार्ककग‍ुंबंजधत‍ूस्ट्तक्षेप‍कज‍कायावजन्ात‍करन‍े के‍जलए‍पररुीमांकन‍ दकया‍जाएगा।‍पीएमए‍की‍पूचान‍और‍पररुीमन‍ुंबंजधत‍जनकायों‍द्वारा‍स्ट्थानीय‍जनााजुयों, बाजार‍ ुंघों, र,दफक‍पुजलु, जीएनुीटीडी‍के‍परराून‍जाभाग अदद‍ुे‍परामिव‍करके‍दकया‍जाएगा। 12.3.3 पार्ककग‍प्रबंधन‍क्षेत्रों‍के‍जलए‍पार्ककग‍प्रबंधन‍क्षेत्र‍यजजनाएं‍(पीएमएपी)‍त,यार‍की‍जाएंगी।‍आन‍यजजनाओं‍ में‍पार्ककग‍प्रबंधन‍के‍जलए‍कायवनीजतयााँ, पार्ककग‍प्रभार, अइटीएु‍ऄनुप्रयजग‍और‍यजजना‍का‍प्रातवन‍ िाजमल‍ूोंगे। 12.3.4 ुरकार‍द्वारा‍जनर्ददष्ट‍पीएमए‍के‍जलए, जीएनुीटीडी‍का‍परराून‍जाभाग‍ुड़क-स्ट्ााजमत्ा‍रखन‍े ााली‍ एजेंजुयों‍और‍स्ट्थानीय‍जूतधारकों‍ुे‍परामिव‍करके‍पीएमएपी‍त,यार‍करने‍के‍जलए‍मुख्य‍एजेंुी‍ूजगा।‍ पीएमए‍के‍पररुीमन‍की‍प्रदक्रया‍में‍तेज़ी‍लाने‍के‍जलए‍जािीे ज्ञ/परामिी‍फमव/ुंस्ट्थाओं‍कज‍जनयजजजत‍ दकया‍जा‍ुकता‍ू,, ुाथ‍ूी‍ुाथ,‍अरडब्ल्यूए, बाज़ार‍ुंघ, परराून‍प्रचालक‍और/या‍्ापार‍ुंघ‍ आत्यादद‍एक‍जचजन्ूत‍क्षेत्र‍के‍जलए‍पीएमएपी की‍त,यारी‍कर‍ुकते‍ू।ैं 12.3.5 बीपीडी, टीओडी, अदद‍ज,ु‍े ुामररक‍मूत्ा‍के‍क्षेत्रों‍के‍जलए, पीएमएपी‍कज‍ईनकी‍ुंबंजधत‍ुुधार‍ यजजनाओं,‍पुनरूद्धार‍यजजनाओं, अइज,डपी अदद‍के‍ुाथ‍एकीकृत‍दकया‍जाएगा। 12.4 ुााजव जनक‍पार्ककग‍का‍प्रबधं न 12.4.1 ुाावजजनक‍पार्ककग‍में‍ुभी‍ऄजधकृत‍ऑन-स्ट्रीट‍और‍ऑफ-स्ट्रीट‍पार्ककग‍िाजमल‍ूजती‍ू,ैं जजुमें‍मल्टी‍ लेाल‍ कार‍ पार्ककग‍ -एमएलुीपी)‍ िाजमल‍ ू‍, और जज‍ िूर‍ भर‍ के‍ जाजभन्न‍ स्ट्थानों‍पर‍ स्ट्थानीय‍ जनकायों/जनजी‍ुंस्ट्थाओं‍द्वारा‍तथा‍स्ट्टेिनों‍के‍पाु‍परराून‍एजेंजुयों‍द्वारा‍मुूय, ा‍करााइ‍जाती‍ू।, ‍ईच्च‍ ुाावजजनक‍परराून‍ईपलब्धता‍स्ट्तर‍(पीटीएएल)‍और‍र,दफक‍की‍भीड़‍ााल‍े क्षेत्रों‍म ें ुाावजजनक‍पार्ककग‍ की‍ईपलब्धता‍कज‍बुएत‍ऄजधक‍पार्ककग‍िल्ु क‍के‍मा्यम‍ु‍े जाजनयजमत‍दकया‍जाएगा‍और‍्जि गत‍ ााूनों‍के‍ईपयजग‍कज‍ूतजत्ुाजूत‍दकया‍जाएगा। 12.4.2 ुमस्ट्त‍ुाावजजनक‍पार्ककग‍कज‍जनधावररत‍मानकों‍और‍ददिा-जनदेिों‍के‍ऄनुुार‍जडजाआन‍दकया‍जाएगा‍ और‍दद्ांगजनों‍के‍जलए‍पार्ककग-ुुजाधा‍जन:िुल्क‍ूजगी। 12.4.3 खुले‍क्षेत्रों‍(टॉट-लॉट, पाकव, खेल‍के‍मद, ान)‍और‍पाररजस्ट्थजतक‍रूप‍ु‍े ुंाेदनिील‍क्षेत्रों‍(नददया,ं झील,ें बाढ़‍के‍म,दान, जंगल, ररज‍अदद)‍या‍ुाावजजनक‍लाभ‍के‍ुाथ‍दकुी‍ऄन्य‍प्रकार‍के‍खुल‍े स्ट्थान‍का‍ ईपयजग‍पार्ककग‍(ुतू‍/‍भूजमगत‍/‍बुए-स्ट्तरीय)‍के‍जाकाु‍के‍जलए‍नूीं‍दकया‍जाएगा।80 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 12.4.4 ुाावजजनक‍पार्ककग‍के‍जलए‍पार्ककग‍िुल्क‍बदलता‍रूगे ा‍तथा‍िूर‍भर‍में‍और‍ऄलग-ऄलग‍ुमय‍पर‍ पररातवनिील‍दरें‍लाग‍ू ूोंगी‍तादक पार्ककग‍की‍मांग‍कज‍स्ट्थाजनक‍रूप‍ुे‍बांटा‍जा‍ुके।‍ुंबंजधत‍ एजेंजुयां‍यू‍ुुजनजित‍करेंगी‍दक‍ऄजधक‍गजतजाजध‍और‍भीड़भाड़‍ााली‍ुड़कों‍पर‍ऄन्य‍स्ट्थानों‍ु‍े ऄजधक‍िुल्क‍लगाया‍जाए।‍ूररत‍ईंधन‍ााल‍े ााूनों‍के‍जलए‍आन‍िुल्कों‍पर‍छूट‍(ुजब्ुडी)‍दी‍जा‍ुकती‍ ू।, 12.4.4.1 ददल्ली‍के‍जलए‍ग्रेडेड‍ररस्ट्पांु‍एक्िन‍प्लान‍के‍ऄनुुार‍गंभीर‍प्रदीू ण‍के‍दौरान‍ााय‍ु प्रदीू ण‍जनयंत्रण‍के‍जलए‍पार्ककग‍िुल्क‍ऄस्ट्थायी‍रूप‍ु‍ेबढ़ाया‍जा‍ुकता‍ू‍, -पयावारण, ान‍ और‍जलाायु‍पररातवन‍मंत्रालय। 12.4.5 ऑन-स्ट्रीट‍(ुड़क‍पर)‍पार्ककग‍का‍प्रााधान i) ऑन-स्ट्रीट‍पार्ककग‍आु‍तरू‍प्रदान‍की‍जाएगी‍दक‍यू‍पद, ल‍चलन‍े ाालों‍और‍ााूनों‍के‍ुचं लन‍म‍ें बाधा‍न‍बने।‍‘पार्ककग’‍और‍‘नज-पार्ककग’‍क्षेत्र‍स्ट्पष्ट‍रूप‍ुे‍ुीमांदकत‍दकए‍जाएंगे‍तथा‍ऑन-स्ट्रीट‍ पार्ककग‍कज‍ईपयुि ‍ुाआनेज‍और‍फुटपाथ‍जचननों‍का‍ईपयजग‍करके‍ददखाया‍जाएगा।‍स्ट्थान‍का‍ ुाोिम‍ईपयजग‍करने‍के‍जलए, कजणीय/लंबात‍पार्ककग‍की‍तलु ना‍में‍ुमानांतर‍ऑन-स्ट्रीट‍पार्ककग‍ कज‍तरजीू‍दी‍जाएगी। ii) ऑन-स्ट्रीट‍पार्ककग,‍ऄस्ट्पतालों‍और‍स्ट्कूलों,‍ुरकारी‍कायावलयों‍आत्यादद‍ज,ुे‍ऄजधक‍अााजाूी‍ााल‍े स्ट्थानों‍के‍जनकट‍ईपलब्ध‍कराइ‍जाएगी, ऐुे‍प्लाटों‍के‍ऄंदर‍पयावप्त‍जपक‍ऄप/ड्रॉप‍ऑफ‍की‍्ास्ट्था‍ की‍जाएगी। iii) ऑन-स्ट्रीट‍पार्ककग‍के‍ुभी‍स्ट्थानों‍पर‍दज-पजूया‍और‍चार‍पजूया‍ााूनों‍के‍जलए‍ईजचत‍स्ट्थान- अांटन‍दकया‍जाएगा। iv) ्जि गत‍मजटर‍ााूनों‍के‍जलए‍ऑन-स्ट्रीट‍ुाावजजनक‍पार्ककग‍जनम्नजलजखत‍स्ट्थानों‍पर‍प्रदान‍नूीं‍की‍ जाएगी: क) 12‍मी.‍ुे‍कम‍और‍60‍मी.‍ुे‍ऄजधक‍मागावजधकार‍ााली‍ुड़कों‍पर।‍ऄजनयजजजत‍क्षेत्रों‍के‍ जलए‍आुमें‍छूट‍दी‍जा‍ुकती‍ू।, ख) दकुी‍भी‍रांजजट‍स्ट्टेिन/ूब‍जु, े‍मेरज‍स्ट्टेिन, अरअरटीएु‍स्ट्टेिन, ईपनगरीय‍रेल‍स्ट्टेिन, अइएुबीटी‍अदद‍ुे‍250‍मीटर‍की‍दरू ी‍तक। ग) पूरी‍तरू‍पद, ल‍याजत्रयों‍के‍जलए‍जनधावररत‍ुड़कों‍पर। घ) अग‍के‍खतरों‍ुे‍बचन‍े के‍जलए‍फ्लाइओार‍और‍ओारपाु‍के‍नीचे। v) मौजूदा‍एमएलुीपी‍ुे‍1000‍मीटर‍की‍दरू ी‍के‍ऄंदर‍ऑन-स्ट्रीट‍ुाावजजनक‍पार्ककग‍कज‍ूतजत्ुाजूत‍ दकया‍जाएगा‍और‍आु‍पर‍लगा‍िुल्क‍एमएलुीपी‍ुे‍ऄजधक‍ूजगा। vi) अााुीय‍क्षत्रे ों‍म‍ें ऑन-स्ट्रीट‍पार्ककग:‍आुका‍ईद्देश्य‍अााुीय‍क्षेत्रों‍म‍ें ुमस्ट्त‍ऑन-स्ट्रीट‍पार्ककग‍कज‍ धीरे-धीरे‍ुमाप्त‍करना‍ू‍, और‍आु‍स्ट्थान‍कज‍ुाावजजनक‍ुाझे‍स्ट्थान‍के‍रूप‍म‍ें पुनः‍प्राप्त‍करना‍ू,, आलाके‍कज‍ुुरजक्षत‍और‍ऄजधक‍जीांत‍बनाना‍ू,।‍अााुीय‍क्षेत्रों‍के‍पुनरूद्धार‍ुे‍ुंपजि‍पररुर‍के‍ ऄंदर‍पार्ककग‍का‍पुनगवठन‍और‍पार्ककग‍की‍जरूरतों‍कज‍ुमायजजजत‍दकया‍जा‍ुकेगा।‍ऑन-स्ट्रीट‍ अााुीय‍पार्ककग‍कज‍जाजनयजमत‍करन‍े के‍जलए‍जनम्नानुुार‍एक‍चरणबद्ध‍दजृ ष्टकजण‍ऄपनाया‍जा‍ ुकता‍ू:,[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 81 क) अााुीय‍कॉलजजनयों/आलाकों‍के‍जलए,‍अरडब्ल्यूए पार्ककग‍की‍मांग‍का अकलन करने‍के‍ बाद‍ऑन-स्ट्रीट‍पार्ककग‍के जलए क्षेत्रों‍कज जचजननत करने‍ूते ु पीएमएपी त,यार कर‍ुकत‍े ू।ैं ‍स्ट्ट,क‍पार्ककग‍के ईपयजग ु े पार्ककग‍की‍ईपलब्धता‍कज‍बढ़ाया‍जा‍ुकता‍ू।, ख) स्ट्थानीय‍जनकाय‍दकुी‍क्षेत्र‍के‍जनााजुयों/अरडब्ल्यूए‍कज‍ुाावजजनक‍ऑन-स्ट्रीट‍पार्ककग‍ स्ट्थान‍के‍ईपयजग‍के‍जलए‍पार्ककग परजमट‍कज‍पट्टे‍पर‍दने े‍की‍प्रणाली‍पर‍जाचार‍कर‍ुकत‍े ू।ैं ग) नए‍ााूनों‍के‍पंजीकरण‍कज‍ााून-माजलक‍के‍पाु‍पार्ककग‍ुुजाधाओं‍की‍ईपलब्धता‍के‍ुाथ‍ जजड़ने‍की‍नीजत‍पर‍भी‍जाचार‍दकया‍जा‍ुकता‍ू।, 12.4.6 ऑफ-स्ट्रीट‍पार्ककग‍का‍प्रााधानः‍ ऑफ-स्ट्रीट‍पार्ककग‍की‍ुुजाधा‍मुख्यत:‍दकु ानदार, ऑदफु‍जाने‍ााले‍्जि यों, ुाावजजनक‍परराून‍के‍ ईपयजगकताव,‍अदद‍ज,ुे‍ईपयजगकतावओं‍की‍लंबी‍ऄाजध‍तक‍पार्ककग‍करन‍े की‍जरूरत‍कज‍परू ा‍करती‍ू।, ‍ जूााँ‍भी‍ुंभा‍ूज,‍ऑफ-स्ट्रीट‍पार्ककग‍ुमाधान‍(ुतू‍पार्ककग, छत‍पार्ककग, स्ट्ट,क‍पार्ककग, बुए-स्ट्तरीय‍ कार‍पार्ककग‍और‍भूजमगत‍पार्ककग)‍ऄपनाए‍जाएंगे। क) ऑफ-स्ट्रीट‍पार्ककग‍की‍ुुजाधा‍जाकजुत‍करन‍े म‍ें बड़ी‍मात्रा‍म‍ें भूजम‍और‍पूंजी‍लगती‍ू‍,और‍यू‍ जाकाु‍कायव‍ुभी‍ुंबंजधत‍एजेंजुयों/जूतधारकों‍ुे‍परामि‍वकरके‍और‍अम‍ुूमजत‍ुे‍ूी‍दकया‍ जाएगा।‍आुे‍पीपीपी‍अधार‍पर‍जाकजुत‍दकया‍जा‍ुकता‍ू।, ख) ऑफ-स्ट्रीट‍पार्ककग‍क्षेत्र/ुुजाधा‍ऄस्ट्पतालों, ुरकारी‍कायावलयों‍आत्यादद‍ज,ु‍े ऄजधक‍अााजाूी‍ ााले‍स्ट्थानों‍के‍जनकट‍ईपलब्ध‍कराइ‍जाएगी‍तादक‍पार्ककग‍की‍जरूरत‍कज‍पूरा‍दकया‍जा‍ुके।‍ जूां‍भी‍ुंभा‍ूज,‍ऑफ-स्ट्रीट‍पार्ककग‍क्षेत्र/ुुजाधा‍के‍जनकट‍जस्ट्थत‍भानों‍के‍जलए‍ुीधी‍पुएचाँ ‍ प्रदान‍की‍जाएगी। ग) ऑफ‍स्ट्रीट‍पार्ककग‍इ-बाइक्ु‍और‍ुाआदकल‍यि ु ‍पीबीएु‍और‍अइपीटी‍तथा‍ट,क्ुी‍के‍जलए‍ पार्ककग‍ज,ुी‍ुुजाधाओं‍ुे‍ुम्पन्न‍ूज‍ुकती‍ू।, ऄजधुूजचत‍टीओडी‍नजड‍के‍मामले‍म,ें‍ऑफ-स्ट्रीट‍ुाावजजनक‍पार्ककग‍ुुजाधा‍ऄजधमानत:‍गून‍ जाकाु‍क्षेत्र‍के‍बाूर‍‘पाकव‍एंड‍राआड’‍की‍ुुजाधा‍के‍रूप‍में‍दी‍जाएगी। घ) एमएलुीपी‍के‍जनमावण‍कज‍अर्नथक‍रूप‍ुे‍्ाूायव‍बनाने‍के‍जलए, ुकल‍तल‍क्षेत्र‍का‍25%‍ तक‍्ााुाजयक‍/‍कायावलय‍स्ट्थान‍के‍जलए‍ईपयजग‍दकया‍जाएगा।‍ऄनुमेय‍्ााुाजयक‍/‍ कायावलय‍स्ट्थान‍ुे‍ईत्पन्न‍पार्ककग‍की‍मांग‍एमएलुीपी‍के‍कुल‍ुमतल्ु य‍कार‍स्ट्थान‍(इुीएु)‍के‍ 25%‍तक‍ुीजमत‍ूजगी। ङ) ुतू‍पार्ककग‍के‍तूत‍क्षेत्र‍का‍80% जूस्ट्ुा‍पानी‍ुजखने‍ााली‍ुामग्री‍ुे‍जनर्नमत‍दकया‍जाएगा। 12.5 जनजी‍पार्ककग‍का‍प्रबधं न 12.5.1 जनजी‍पार्ककग‍जनजी‍स्ट्ााजमत्ााधीन‍ुंपजियों‍के‍पररुर‍में‍की‍जाती‍ू।, ‍यू‍पार्ककग‍मानकों‍के‍ऄनुुार‍ ूजती‍ू‍, जज‍प्रत्येक‍ईपयजग‍पररुर‍के‍जलए‍जनधावररत‍ू‍, (दखे ें:‍डीुीएन)।‍पार्ककग‍मानक‍कज‍ुमतुल्य‍ कार‍स्ट्थान‍(इुीएु) के‍रूप‍में‍जनधावररत‍दकया‍गया‍ू‍, और‍आुमें‍ुभी‍प्रकार‍के‍ााूनों‍ऄथावत‍कार, स्ट्कूटर, ुाआदकल, ूल्के‍और‍भारी‍्ााुाजयक‍ााून, बु अदद‍के‍जलए‍पार्ककग‍िाजमल‍ू।, 12.5.2 डीुीएन‍में‍जनधावररत‍पार्ककग‍मानदंड, जनम्नजलजखत‍ितों‍के‍ऄधीन‍युजि ुगं त‍बनाए‍जाएंग:े82 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] i) यदद‍कजइ‍ुंपजि‍दकुी‍एमएलुीपी‍के‍500‍मीटर‍के‍दायरे‍में‍जस्ट्थत‍ू,,‍तज‍ईु‍पररुर/ुंपजि‍के‍ जलए‍पार्ककग‍ुंबंधी‍अाश्यकता‍(इुीएु)‍10‍प्रजतित‍कम‍कर‍दी‍जाएगी।‍यू‍जािेी‍रूप‍ु‍े अााुीय‍ुंपजियों‍पर‍लागू‍नूीं‍ूजगा‍(ऄथावत‍‍यू‍्ााुाजयक‍और‍जमजश्रत‍ईपयजग‍ााली‍ुड़कों‍ पर‍लागू‍ूजगा)।‍एमएलुीपी‍कटौती‍के‍जलए, प्लाट‍क्षेत्र‍का‍कम‍ुे‍कम‍‍50%‍जूस्ट्ुा‍जनधावररत‍दरू ी‍ के‍ऄंदर‍अएगा। ii) ुाावजजनक‍परराून‍ईपलब्धता‍स्ट्तर‍(पीटीएएल)‍मल्ू य‍के‍अधार‍पर,‍डीुीएन‍के‍ऄनुुार‍पार्ककग‍ मानदंड‍जनम्नजलजखत‍लागू‍प्रजतित‍कटौती‍के‍ऄनुुार‍कम‍दकए‍जाएंगे: ताजलका‍12.0:‍पीटीएएल के‍ऄनुु ार‍पार्ककग‍मानदडं ‍म‍ेंप्रजतित‍कटौती‍ पीटीएएल ईपलब्धता‍ुचू काकं ‍रेंज अााुीय ्ााुाजयक औद्यजजगक पीएुपी 0‍(जनकृष्ट) 0 – 2 0 0 0 0 1 2 -3 0 0 0 0 2 3 – 5.5 10 5 5 10 3 5.5 – 7 20 10 10 20 4 7 – 8.5 20 20 20 20 5 8.5 – 12 20 20 20 30 6 12 – 20 20 30 30 30 7 20 – 30 30 30 30 30 8 30 और‍ईुुे‍उपर 30 30 30 30 क) पीटीएएल कटौती‍प्लॉट‍के‍ईपलब्धता‍ुूचकांक‍रेंज‍(एक्ुेु‍आंडेक्ु‍रेंज)‍के‍ऄनुुार‍ूजगी। ख) बुएल‍ईपलब्धता‍ुूचकांक‍रेंज‍में‍अने‍ााले‍प्लॉटों‍के‍जलए, प्लॉट‍पर‍ऄजधकतम‍क्षेत्र‍के‍ईपलब्धता‍ ुूचकांक‍रेंज‍की‍कटौजतयााँ‍लाग‍ूूजगी। 12.5.3 ऄजधुूजचत‍टीओडी‍नजड‍के‍प्रभाा‍क्षेत्र‍में‍अन‍े ााल‍े क्षेत्र‍के‍जलए, टीओडी‍नीजत‍के‍ऄनुुार‍इुीएु मानदंड‍लाग‍ूूोंगे।‍(देख:ें‍डीइाी‍4) 12.6 ऄन्य‍परराून-ुाधनों‍के‍जलए‍पार्ककग‍का‍जनयमन 12.6.1 माल‍ााून:‍माल‍की‍अााजाूी‍थजक‍बाजारों‍की‍ऄाजस्ट्थजत, ईत्पाद/‍मद‍के‍प्रकार, मौजूदा‍जातरण‍ प्रणाली‍अदद‍ु‍े जनकटता‍ु‍े जुड़ी‍ुएइ‍ू।, ‍ुंबंजधत‍स्ट्थानीय‍जनकायों/एजेंजुयों‍द्वारा‍माल‍ााूनों‍की‍ पार्ककग‍के‍जलए‍्ााुाजयक‍और‍औद्यजजगक‍क्षेत्रों, अइएफुी, ‍अइुीडी‍अदद‍के‍पाु‍पयावप्त‍क्षेत्र‍की‍ पूचान‍की‍जाएगी।‍प्रजतबंजधत‍प्रािे ‍ुमय‍के‍दौरान, माल/माल-ढुलाइ‍ााूनों‍के‍जलए‍पार्ककग‍की‍ ्ास्ट्था‍टजल‍गेट/प्लाजा‍के‍बाूर‍की‍जाएगी। i) इ-कॉमुव‍के‍जलए‍ईपयजग‍दकए‍जाने‍ााले‍ााूनों‍की‍पार्ककग‍ुंबंजधत‍इ-कॉमुव‍कंपनी‍द्वारा‍ ाेयरूाईलुग‍और‍जातरण‍ुुजाधा-केंद्र‍में‍प्रदान‍की‍जाएगी।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 83 12.6.2 ुाझे‍परराून‍ुाधन‍(मजड):‍ुभी‍ऄजधकृत‍पार्ककग‍क्षेत्रों‍में‍अइपीटी, जनजी‍बुें, ट,क्ुी‍अदद‍ज,ुे‍ुाझा‍ मजड‍की‍पार्ककग‍कज‍प्राथजमकता‍दी‍जा‍ुकती‍ू।, i) ुभी‍एमएमअइ‍यजजनाएं‍ुाझ‍े परराून‍ुाधन‍की‍छजटी‍ऄाजध‍की‍पार्ककग‍के‍जलए‍और‍ड्रॉप- ऑफ‍एां‍जपक-ऄप‍क्षेत्रों‍के‍जलए‍पयावप्त‍प्रााधान‍करेंगी। 12.6.3 बुें:‍ुभी‍बुों‍कज‍ईनके‍जनधावररत‍जडपज‍में‍पाकव‍दकया‍जाएगा।‍यदद‍आन‍बु‍जडपज‍की‍क्षमता‍मौजूदा‍या‍ भााी‍मांग‍के‍जलए‍ऄपयावप्त‍ू,, तज‍आन‍जडपज‍कज‍बुए-स्ट्तरीय‍पार्ककग‍में‍पररार्नतत‍दकया‍जा‍ुकता‍ू।, ‍ ऄंतरराज्यीय‍बुों‍के‍जलए, अइएुबीटी‍के‍ऄंदर‍पयावप्त‍जनजष्क्रय‍पार्ककग‍प्रााधान‍दकया‍जाएगा। 12.6.4 स्ट्कूल‍परराून:‍ददल्ली‍के‍ऄजधकतर‍स्ट्कूलों‍में‍ऄपन‍े पररुर‍के‍ऄंदर‍स्ट्कूल‍परराून‍(बुों‍और‍ा,न)‍की‍ पार्ककग‍के‍जलए‍पयावप्त‍स्ट्थान‍नूीं‍ू।, ‍आन‍ााूनों‍कज‍ुड़कों‍के‍क,ररजाे‍पर‍पाकव‍दकया‍जाता‍ू,, जजुुे‍ ााूनों‍की‍भीड़-भाड़‍ूज‍जाती‍ू‍, और‍बच्चों‍के‍जलए‍ऄुुरजक्षत‍जस्ट्थजतयां‍प,दा‍ूज‍जाती‍ूैं।‍आु‍ुमस्ट्या‍कज‍ कम‍करन‍ेके‍जलए‍जनम्नजलजखत‍ईपायों‍की‍जुफाररि‍की‍जाती‍ू:, i) ुभी‍मौजूदा‍और‍नए‍स्ट्कूल‍ऄपने‍पररुर‍के‍ऄंदर‍स्ट्कूल‍परराून‍के‍जपक-ऄप, ड्रॉप-ऑफ‍और‍ पार्ककग‍के‍जलए‍स्ट्थान‍प्रदान‍करेंगे। 12.7 चारदीाारी‍िूर‍(ााल्ड‍जुटी)‍म‍ेंपार्ककग 12.7.1 ुंबंजधत‍स्ट्थानीय‍जनकाय‍चारदीाारी‍िूर‍के‍ऄंदर‍जाजभन्न‍क्षत्रे ों‍के‍जलए‍पीएमएपी‍त,यार‍करेंगे‍तादक‍ भीड़‍का‍कुछ‍ुमाधान‍ूज‍ुके, प,दल‍चलने‍ाालों‍के‍जलए‍ुड़कों‍कज‍ुुरजक्षत‍बनाया‍जा‍ुके‍और‍मजटर‍ चाजलत‍ााूनों‍की‍अााजाूी‍कुछ‍ुड़कों/क्षेत्रों‍तक‍ुीजमत‍की‍जा‍ुके। 12.8 स्ट्माटव‍पार्ककग‍स्ट्थल‍प्रबधं न 12.8.1 ईपयजगकतावओं‍कज‍ऑन-स्ट्रीट‍और‍ऑफ-स्ट्रीट‍पार्ककग‍ुुजाधाओं‍की‍क्षमता‍और‍ऄजधभजग,‍जनकटतम‍ ईपलब्ध‍पार्ककग‍स्ट्थल(लों)‍और‍िल्ु क‍की‍ाास्ट्तजाक‍ुमय‍म‍ें तत्काल‍जानकारी‍देने‍के‍जलए‍स्ट्माटव‍एप‍ जाकजुत‍दकए‍जा‍ुकते‍ू।, ‍ुभी‍ऑफ-स्ट्रीट‍ुुजाधाएं‍पार्ककग‍स्ट्थलों‍की‍ईपलब्धता‍ददखाने‍के‍जलए‍ ऄपन‍ेप्राेि‍द्वारों‍पर‍जडजजटल‍जडस्ट्प्ल‍े करेंगी। 12.8.2 ऐप-अधाररत‍प्लेटफॉमव‍एक‍ुाझा‍ुंुाधन‍के‍रूप‍म‍ें पार्ककग‍(जनजी‍स्ट्ााजमत्ा‍ााली‍पार्ककग‍स्ट्थानों‍ ुजूत)‍के‍ईपयजग‍की‍ुुजाधा‍भी‍प्रदान‍कर‍ुकते‍ू।ैं 12.8.3 िूर‍भर‍म‍ें कइ‍कबाड़‍ााूनों‍कज‍पाकव‍दकया/छजड़‍ददया‍जाता‍ू,, और‍ाे‍ुड़क‍के‍दकनारे‍की‍ऄपयावप्त‍ जगू‍घेर‍लेत‍े ू।ैं ‍स्ट्थानीय‍जनकाय‍और‍र,दफक‍पुजलु‍यू‍ुुजनजित‍करेंग‍े दक‍ऐु‍े ााूनों‍कज‍एक‍ जनजित‍ुमय‍ुीमा‍के‍ऄंदर‍कबाड़घर‍ल‍ेजाया‍जाए। --- x --- x ---- x --- x ---84 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] खडं ‍6 भौजतक‍ऄाुरं चना पष्ठृ भजू म‍और‍प्रमखु ‍नीजतगत‍ुरजकार जल‍अपर्नू तः ददल्ली‍म‍ें जल‍अपूर्नत‍एां‍जातरण‍कज‍प्रमुख‍तौर‍पर‍ददल्ली‍जल‍बजडव‍(डीजेबी)‍द्वारा‍प्रबंजधत‍दकया‍जाता‍ू।, ‍नइ‍ददल्ली‍ नगरपाजलका‍पररीद‍(एनडीएमुी)‍और‍ददल्ली‍छाानी‍के‍तूत‍अने‍ााले‍क्षेत्रों‍में, डीजेबी‍पयावप्त‍मात्रा‍में‍पानी‍की‍ अपूर्नत‍करता‍ू,, जबदक‍एनडीएमुी‍और‍ददल्ली‍छाानी‍जातरण‍का‍प्रबंधन‍करता‍ू।, ‍जातरण‍प्रणाली‍द्वारा‍कार‍नूीं‍ दकए‍जाने‍ााले‍क्षेत्रों‍म,ें डीजेबी‍टैंकर‍ुेाा‍के‍मा्यम‍ुे‍पानी‍की‍अपूर्नत‍करता‍ू।, ददल्ली‍एक‍पानी‍की‍कमी‍ााला‍िूर‍ू,, और‍जनुंख्या‍में‍बते ूािा‍ाृजद्ध‍पानी‍की‍बेकार‍खपत‍एां‍पानी‍की‍प्रणालीगत‍ ूाजन‍के‍कारण‍भी‍ईपलब्ध‍जल‍ुंुाधनों‍पर‍दबाा‍कइ‍गनु ा‍बढ़‍गया‍ू।, ‍भूजल‍स्ट्तर‍म‍ें जनरंतर‍जगरााट‍देखी‍गइ‍ू,, यमुना‍नदी‍में‍भारी‍प्रदीू ण‍और‍पूरी‍ददल्ली‍में‍ऄक्ुर‍जलभराा‍के‍ईदाूरण‍देखन‍े कज‍जमले‍ू।ैं ‍झील‍ें और‍ऄन्य‍जल‍ जनकाय, पुनभवरण‍ुरं चनाओं‍के‍रूप‍म‍ें प्रभााी‍ढंग‍ु‍े काय‍व नूीं‍कर‍रू‍े ूैं, ाीाव‍जल‍के‍ऄजधकांि‍जूस्ट्ु‍े का‍ुंचयन‍नूीं‍ दकया‍जाता‍ू,, ुीजमत‍ुीारेज‍नेटाकव‍ईत्पन्न‍ऄपजिष्ट‍जल‍के‍प्रााू‍कज‍प्रजतबंजधत‍करता‍ू,, और‍िजजधत‍ऄपजिष्ट‍जल‍का‍ न्यूनतम‍पुनःईपयजग‍दकया‍जाता‍ू।, ‍चूंदक‍ददल्ली‍मीठे‍पानी‍के‍जलए‍मुख्य‍रूप‍ुे‍बाूरी‍स्रजतों‍पर‍जनभवर‍ू,, मांग‍म‍ें जनरंतर‍ाृजद्ध‍ु‍े भजाष्य‍में‍अपर्नू त‍पर‍ऄुर‍पड़‍ुकता‍ू।, ‍िूर‍की‍भजाष्य‍की‍अाश्यकताओं‍कज‍पूरा‍करने‍के‍जलए, कुछ‍ दीघवकाजलक‍ुंभाानाएं‍ू,ैं जजनकी‍खजज‍ऄंतर-राज्य‍ुमझौतों‍के‍मा्यम‍ुे‍कच्चे‍पानी‍की‍प्राजप्त‍ूते ु‍ुंबंजधत‍प्राजधकरणों‍ द्वारा‍की‍जा‍ुकती‍ू।, ‍ददल्ली‍तेजी‍ुे‍लगातार‍पानी‍की‍कमी‍के‍लचताजनक‍स्ट्तर‍की‍ओर‍बढ़‍रूी‍ू , और‍‍ददल्ली‍म‍ें जल‍ ुुरक्षा‍की‍प्राजप्त‍ूते ‍ु ातवमान‍अपूर्नत-ईन्मुख‍जल‍प्रबंधन‍दजृ ष्टकजण‍कज‍दफर‍ुे‍जनयजजजत‍करन‍ेकी‍अाश्यकता‍ू।, ‍ जस्ट्थरता‍के‍दजृ ष्टकजण‍ुे‍ददल्ली‍के‍जलए‍जल‍ुुरक्षा, जल‍और‍जल‍ुे‍ुंबंजधत‍पयावारणीय‍ुेााओं‍का‍कायव‍ूजगी।‍ददल्ली‍के‍ जलए‍एक‍एकीकृत‍िूरी‍जल‍प्रबंधन‍(अइयडू ब्लूएम)‍दजृष्टकजण‍ऄपनाया‍जा‍ुकता‍ू‍, जूां‍िूरी‍जल‍चक्र‍म‍ें जल-ुंबद्ध- अधाररक‍ुंरचना’‍रखन‍े के‍जलए‍जल‍अपूर्नत, ऄपजिष्ट‍जल‍प्रबंधन‍और‍बरुाती‍जल‍जनकाुी‍कज‍अपु‍म‍ें जजड़ा‍जाएगा।‍‍ ुतूी‍जल, ाीाव‍जल, ऄपजिष्ट‍जल‍और‍भूजल‍यूा‍ाँ पानी‍के‍चार‍पुएचाँ ‍लबद‍ु मान‍े जात‍े ूैं, जजन्ू‍ें एक‍ुाथ‍प्रबंजधत‍करना‍ ूजता‍ू।, ‍मुख्य‍फजकु‍ुतूी‍जल‍और‍भूजल‍पर‍कम‍ुे‍कम‍जनभवर‍ूजने‍और‍ददल्ली‍के‍भजाष्य‍की‍पानी‍की‍जरूरतों‍के‍ जलए‍पानी‍के‍ग,र-पारंपररक‍स्रजतों‍की‍ुंभााना‍कज‍पूचानना‍ू।, ‍ुतूी‍जल‍और‍भूजल‍पर‍जनभवरता‍कज‍कम‍करने‍और‍ ददल्ली‍की‍भजाष्य‍की‍पानी‍की‍जरूरतों‍के‍जलए‍पानी‍के‍ग,र-पारंपररक‍स्रजतों‍की‍क्षमता‍कज‍ुाकार‍करने‍पर‍्यान‍केंदद्रत‍ दकया‍गया‍ू।, ‍एकीकृत‍िूरी‍जल‍प्रबंधन‍दजृष्टकजण, कुिल‍जल‍ईपयजग‍कज‍ऄजधकतम‍करता‍ू।, ‍ ददल्ली‍की‍ऄनुमाजनत‍जल‍की‍मांग‍आु‍प्रकार‍ू:, ाीव जनुंख्या मााँग‍मानदडं *‍ ुभी‍ स्रजतों‍ ु‍े कुल‍मांग‍ कमी‍ (जमजलयन) ईपलब्धता‍ (एमजीडी) (एमजीडी) (जीपीुीडी) ‍ (एमजीडी) 2020 19 60 935 1140 141 2041 29.1 60 - 1746 - 2041 29.1 50 - 1455 -[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 85 *आुमें‍घरेल,ू ााजणजज्यक, औद्यजजगक‍मांग‍िाजमल‍ू‍,और‍ऄजग्न‍िमन‍ुेााओं‍की‍मांग‍भी‍िाजमल‍ू।ैं ूालांदक, ददल्ली‍म‍ें कच्चे‍पानी‍की‍ुीजमत‍ईपलब्धता‍के‍कारण, डीजेबी‍का‍लक्ष्य‍घरेलू‍ईपयजग‍के‍जलए‍पीन‍े यजग्य‍पानी‍ की‍मांग‍कज‍युजि ुंगत‍बनना‍ू,, जजुे‍धीरे-धीरे‍50‍जीपीुीडी‍(225‍एलपीुीडी)‍तक‍कम‍करने‍की‍अाश्यकता‍ू,, तथा‍ ाांजछत‍गुणािा‍ााले‍गर, -पीने‍यजग्य‍पानी‍का‍ईपयजग‍गर, -पीने‍यजग्य‍प्रयजजनों‍के‍जलए‍पूरक‍ू।, ‍औद्यजजगक‍और‍ बागाानी/ईद्याजनकी/कृजी‍ईद्देश्यों‍के‍जलए‍पानी‍की‍मांग‍कज‍ाांजछत‍गुणािा‍मानकों‍ााल‍े पनु नवाीनीकरण‍ऄपजिष्ट‍ु‍े पूरा‍ दकया‍जाना‍चाजूए।‍50‍जीपीुीडी‍की‍दर‍ुे‍29.1‍जमजलयन‍की‍ऄनुमाजनत‍अबादी‍के‍जलए‍पीने‍के‍पानी‍की‍मागं ‍1455‍ एमजीडी‍के‍लगभग‍ूजती‍ू।, ऄपजिष्ट‍जल‍प्रबधं नः ददल्ली‍में,‍ऄपजिष्ट‍जल‍का‍प्रबधं न‍ुीाेज‍जातरण‍नेटाकव‍प्रणाली‍और‍ुेजप्टक‍टैंक‍के‍रूप‍म‍ें ऑनुाआट‍स्ट्ाच्छता‍प्रणाली‍ दजनों‍द्वारा‍दकया‍जाता‍ू।, ‍डीजेबी‍स्ट्ाच्छता‍नेटाकव‍की‍ुंपूणव‍मूल्य‍श्रृंखला‍के‍जलए‍जजम्मेदार‍ू,, जजुमें‍ऄपजिष्ट‍जल‍का‍ ुंग्रूण, िजधन‍और‍जनपटान‍िाजमल‍ू।, ‍ऄनुमानतः‍ददल्ली‍के‍45‍प्रजतित‍जूस्ट्ुे‍म‍ें ुीाेज‍प्रणाली‍नूीं‍ू‍,और‍िीे ‍क्षत्रे ‍ु‍े ईत्पन्न‍ुीाेज, कइ‍ुतूी‍नालों‍के‍मा्यम‍ुे‍बूकर‍नदी‍म‍ें चला‍जाता‍ू।, ‍ूालांदक, जनयजजजत‍क्षेत्रों‍के‍ऄलााा, ददल्ली‍ जल‍बजड,व‍ददल्ली‍की‍ऄनजधकृत‍कॉलजजनयों‍म‍ें भी‍ुीार‍लाआनों‍का‍जास्ट्तार‍कर‍रूा‍ू।, ‍ददल्ली‍जल‍बजड‍व न‍े जाकेन्द्रीकृत‍ ऄपजिष्ट‍जल‍िजधन‍प्रणाली‍और‍ऄन्य‍कीचड़‍(स्ट्लज)‍प्रबंधन‍प्रणाजलयों‍की‍भी‍यजजना‍बनाइ‍ू,, तादक‍नालों‍म‍ें ऄिजजधत‍ ुीारेज‍कज‍डंप‍ूजन‍े ुे‍रजका‍जा‍ुके।‍ऐुे‍क्षेत्रों‍‍म‍ें ‍जूां‍‍ुीार‍लाआन‍जबछाना‍‍ुंभा‍नूीं‍ू‍, ाूां‍डीजेबी, नदी‍म‍ें बून‍े ुे‍पूले‍242‍एमजीडी‍ऄिजजधत‍बजूस्राा‍कज‍रजकता‍ू‍, और‍आुे‍िजजधत‍करने‍के‍लक्ष्य‍के‍ुाथ‍आंटरुेप्टर‍ुीार‍प्रजजेक्ट‍ (अइएुपी)‍की‍एक‍ुमानांतर‍प्रणाली‍के‍मा्यम‍ुे‍108‍ईप-नालों‍ुे‍ऄिजजधत‍बजूस्राा‍कज‍एकत्र‍करने‍की‍यजजना‍ बना‍रूा‍ू।, बढ़ती‍अबादी‍और‍पानी‍की‍मांग‍में‍बढ़जतरी‍के‍ुाथ, ाीव‍2041‍तक‍कुल‍ऄपजिष्ट‍जल‍के‍लगभग‍1200‍एमजीडी‍ूजन‍े की‍ईम्मीद‍ू।, ‍मौजूदा‍िजधन‍क्षमता‍लगभग‍597‍एमजीडी‍ू‍, जजुे‍पयावप्त‍रूप‍ुे‍बढ़ाया‍जाना‍ू,, तथा‍प्लॉट/स्ट्कीम‍स्ट्तर‍ पर‍जाकेंद्रीकृत‍िजधन‍के‍जलए‍कायनव ीजतयों‍कज‍लाग‍ू करके‍केन्द्रीकृत‍िजधन‍प्रणाली‍पर‍भार‍कज‍काफी‍ूद‍तक‍कम‍दकया‍ जा‍ुकता‍ू।, ‍पानी‍की‍अपूर्नत-मांग‍के‍बीच‍ऄतं र‍कज‍कम‍करने‍के‍जलए‍िजजधत‍ऄपजिष्ट‍जल‍का‍िजधन‍और‍पुनःईपयजग‍ भी‍एक‍ुंभाजात‍ऄाुर‍ू।, जलजनकाुीः‍ददल्ली‍की‍जलजनकाुी‍की‍ुंरचना‍कज‍ऄरााली‍तलूटी‍और‍आुुे‍जड़ु े‍जास्ट्तारों‍द्वारा‍एक‍बड़े‍प,मान‍े पर‍ पररभाजीत‍दकया‍गया‍ू।, ‍आन‍प्रभााों‍के‍तूत, पजिम‍में‍ऄजधक‍उंचाइ‍ुे‍पूाव‍म‍ेंयमुना‍की‍ओर‍एक‍पूाी‍बरुाती‍जल‍की‍ गजतजाजध‍कज‍आंजगत‍दकया‍गया‍ू।, ‍ददल्ली‍कज‍छू‍जलजनकाुी‍जजनों‍(क्षेत्रों)‍में‍ुीमांदकत‍दकया‍गया‍ू,, नामतः‍(i)‍ईिरी‍ (नॉथ)व ‍जजन, (ii)‍पजिमी‍जजन, (iii)‍ुेंरल‍ईिर‍पजिम‍और‍दजक्षण‍पूाी‍जजन, (iv)‍ुेंरल‍दजक्षण‍और‍दजक्षण‍पूाी‍जजन, (v)‍ पूाी‍जजन, और‍(vi)‍दजक्षण‍जजन।‍ग्यारू‍जाजभन्न‍एजेंजुयां नामतः‍लुचाइ‍एा‍ं बाढ़‍जनयंत्रण, लजक‍जनमावण‍जाभाग, दजक्षणी‍ददल्ली‍नगर‍जनगम, ईिरी‍ददल्ली‍नगर‍जनगम, पूाी‍ददल्ली‍नगर‍जनगम, नइ‍ददल्ली‍नगरपाजलका‍पररीद, ददल्ली‍ जाकाु‍प्राजधकरण, ददल्ली‍राज्य‍औद्यजजगक‍एा‍ं अधाररक‍ुंरचना‍जाकाु‍जनगम, ददल्ली‍छाानी, न,िनल‍थमवल‍पाार‍ कापोरेिन‍जलजमटेड‍और‍यपू ी‍लुचाइ,‍ददल्ली‍के‍ुंपूणव‍िूरी‍जास्ट्तार‍ुे‍जनकलने‍ााले‍बरुाती‍जल‍प्रााू‍की‍स्ट्ायं‍ ्ास्ट्था‍करत‍े ू‍ैं और‍आुका‍प्रबंधन‍करते‍ू,ैं जज‍दक‍लगभग‍426.55‍दकमी‍की‍प्राकृजतक‍जल‍जनकाुी‍लाआनों‍और‍ लगभग‍3,311.54‍दकमी‍ााले‍मानाजनर्नमत‍बरुाती‍जल‍नालों‍के‍मा्यम‍ुे‍प्रााजूत‍ूजती‍ू।,86 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] िूर‍के‍जाजभन्न‍जूस्ट्ुों‍म‍ें बाढ़‍की‍जस्ट्थजत‍कज‍कम‍करन‍े के‍जलए, बरुाती‍जलजनकाुी‍के‍बुजनयादी‍ढांचे‍कज‍कुिल‍बनाया‍ जाना‍ू।, ‍आुजलए, ऄकुिल‍जलजनकाुी‍की‍ऄाुंरचना‍कज‍दरू ‍करने‍के‍जलए‍ुुधारात्मक‍स्ट्थाजनक‍कायवनीजतयों‍कज‍लाग‍ू करना‍और‍कम‍लागत‍ााल‍े बाढ़-रजकथाम‍के‍ईपायों‍कज‍लाग‍ू करना‍ईजचत‍ू,, ज,ुे‍दक‍जलजनकायों‍का‍पुननवाीकरण, ाीाव‍ जल‍ुंचयन‍ूते ु‍पाकों‍का‍ईपयजग‍करना‍अदद।‍आुके‍ऄलााा, ठजु‍ऄपजिष्ट‍और‍ुीाेज‍का‍प्रबंध‍करने‍की‍अाश्यकता‍ू,, तादक‍बरुाती‍जल‍का‍प्रााू‍ऄारूद्ध‍न‍ूज‍ुके। ठजु‍ऄपजिष्ट‍प्रबधं न‍(एु.डब्ल्य.ूएम.): ददल्ली‍म‍ें ठजु‍ऄपजिष्ट‍ुृजन‍की‍प्राृजि‍जपछले‍कइ‍ाीों‍ुे‍लगातार‍बढ़‍रूी‍ू,।‍ददल्ली‍में‍नगरीय‍ठजु‍ऄपजिष्ट‍ (एमएुडब्ल्यू)‍का‍प्रबंधन‍स्ट्थानीय‍जनकायों‍के‍ऄजधकार‍क्षेत्र‍म‍ें ू।, ‍ठजु‍ऄपजिष्ट‍प्रबंधन‍के‍जलए‍स्ट्थानीय‍जनकायों‍न‍े ददल्ली‍कज‍12‍जजन‍में‍ागीकृत‍दकया‍ू।, ‍गर, -नगरीय‍ऄपजिष्ट/कचरे‍में‍इ-ऄपजिष्ट‍(इ-ाेस्ट्ट)‍(जबजली, आलेक्रॉजनक्ु, ब,टरी‍ ऄपजिष्ट), बायजमेजडकल‍ऄपजिष्ट, खतरनाक‍ऄपजिष्ट‍और‍जनमावण‍ा‍ढूाए‍गए‍जनमावण‍(ुीएंडडी)‍ऄपजिष्ट‍िाजमल‍ू।ैं ‍ ददल्ली‍म‍ें गर, -नगरीय‍ऄपजिष्ट‍कज‍ईुके‍प्रबंधन‍की‍जनगरानी‍के‍जलए‍ददल्ली‍प्रदीू ण‍जनयंत्रण‍ुजमजत‍(डीपीुीुी)‍द्वारा‍ प्राजधकृत‍आकाआयों‍में‍प्रजुेु‍(प्रुंस्ट्कृत)‍दकया‍जाता‍ू।, ‍पयावारण, ान‍एां‍जलाायु‍पररातवन‍मंत्रालय‍ने‍ऄपजिष्ट‍के‍प्रबंधन‍ ूते ु‍पथृ क‍जनयमों‍कज‍ऄजधुूजचत‍दकया‍ू,, जजन्ू‍ें कड़ाइ‍ुे‍लागू‍दकया‍जाएगा। ददल्ली‍म,ें ऄपजिष्ट‍का‍मूत्ापूणव‍जूस्ट्ुा‍नगरीय‍ठजु‍ऄपजिष्ट‍(एमएुडब्ल्यू)‍ू।, ‍िूर‍म‍ें ईत्पन्न‍ूजने‍ााले‍एमएुडब्ल्य‍ू का‍लगभग‍55%‍जूस्ट्ुा‍3‍ुेनटे री‍लडैं दफल‍ुाआट्ु‍(एुएलएफ)‍में‍डाला‍जाता‍ू।, ‍ददल्ली‍की‍न्यून‍एुडब्ल्यूएम‍दक्षता, यूां‍ूजने‍ााले‍कम‍ऄपजिष्ट‍पथृ क्करण‍और‍जनम्न‍पुनःचक्रण‍(प्रुंस्ट्करण)‍दक्षता‍का‍पररणाम‍ू।, ‍प्रजत‍्जि ‍ऄपजिष्ट‍ुृजन‍ की‍ातवमान‍प्राृजियों‍कज‍्यान‍में‍रखत‍े ुएए, िूर‍म‍ें ईत्पन्न‍नगरीय‍ठजु‍ऄपजिष्ट‍(एमएुडब्ल्यू)‍की‍कुल‍मात्रा‍ाी‍व 2041‍ तक‍12,350‍टीपीडी‍ु‍ेबढ़कर‍18,915‍टीपीडी‍ूजन‍े का‍ऄनमु ान‍ू।, ाीव‍ जनुंख्या‍ ईत्पन्न‍एमएुडब्ल्य‍ू ुंगृूीत‍ ऄपजिष्ट‍ ातवमान‍ लैंडदफल‍ के‍ (जमजलयन) (@650‍ ग्राम/प्रजत‍ (टीपीडी)‍ प्रुंस्ट्करण‍ क्षमता‍ जलए‍भेजा‍गया‍ (टीपीडी) ऄपजिष्ट‍ ्जि )‍ (टीपीडी) 2020 19 12,350 10,500 (85% 45% 4,725 कायवक्षमता) 2041 29.1 18,915 - - - क्र.ुं. ुुजाधा स्ट्थान‍ क्षमता आनके‍द्वारा‍प्रबंजधत 1. कंपजलस्ट्टग‍प्लांट्ु 1. ओखला‍ 200 टीपीडी अइएल‍एां‍एफएु‍ 2. बााना 700 टीपीडी डीएमएुडब्ल्यूएुएल‍ के‍ मा्यम‍ु‍े नॉथव‍डीएमुी‍‍ 2. उजाव‍ुंयंत्रों‍के‍जलए‍ऄपजिष्ट‍‍ 1. बााना 1500 टीपीडी नॉथव‍डीएमुी‍‍ 2. ओखला‍ 1800 टीपीडी एुडीएमुी[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 87 3. गाजीपुर 1300 टीपीडी इडीएमुी 3. ुीएंडडी‍प्रजुेलुग‍प्लांट्ु‍ 1. बुराड़ी‍ 2000 टीपीडी नॉथव‍डीएमुी‍‍ 2. िास्त्री‍पाकव‍‍ 500 टीपीडी इडीएमुी 3. रानीखेड़ा‍ 150 टीपीडी डीएमअरुी‍ 4. लैंडदफल 1. भलस्ट्ाा‍ 70‍एकड़ नॉथव‍डीएमुी‍‍ 2. गाजीपुर 70‍एकड़ इडीएमुी 3. ओखला 46‍एकड़ एुडीएमुी‍ नगर‍जनगम,‍ऄपजिष्ट‍के‍प्रबंधन‍ूते ु‍जाजभन्न‍पद्धजतयां‍ऄपनाते‍ूैं, ददल्ली‍में‍ठजु‍ऄपजिष्ट‍प्रबंधन‍अधाररक‍ुंरचना‍का‍ जाूगं ाालजकन‍जनम्नानुुार‍ूः, लैंडदफल‍ुाआटें‍पूल‍े ूी‍ऄपनी‍क्षमता‍ु‍े ऄजधक‍भर‍चुकी‍ूैं, जजुका‍प्रभाा‍िूर‍के‍ठजु‍ऄपजिष्ट‍प्रबंधन‍अधाररक‍ ुंरचनाओं‍पर‍पड़ेगा।‍प्रजत‍्जि ‍ऄपजिष्ट‍ुृजन‍कज‍कम‍करन,े ‍प्रुंस्ट्करण,‍पुनचवक्रण‍क्षमता‍में‍बढ़जतरी‍करके‍और‍ जाकेंद्रीकृत‍प्रबंधन‍के‍जलए‍कायनव ीजतयों‍पर‍्यान‍ददया‍जाएगा। जाद्यतु ‍अपर्नू त, ुचं ार‍एा‍ंगु, ‍ऄाुरं चनाः जाद्यतु ‍अपर्नू त‍का‍ददल्ली‍म‍ें चार‍जास्ट्ततृ ‍श्रेजणयों‍के‍ऄंतगतव ‍प्रबंधन‍दकया‍जाता‍ू‍, -‍ईत्पादन, ूजलल्डग‍(धारण), रांुजमिन‍ और‍जातरण।‍ददल्ली‍म‍ें ाी‍व 2016-17 के‍दौरान‍प्रजत‍्जि ‍जबजली‍की‍खपत‍1561 यूजनट‍प्रजत‍ाी‍व ुे‍ऄजधक‍रूी‍ू,, जबदक‍राष्ट्रीय‍औुत‍1122 यूजनट‍ू।, ‍ददल्ली‍के‍जबजली‍ईपयजग‍प,टनव‍के‍ागीकरण‍के‍ऄनुुार‍यू‍खपत‍घरेलू‍ईपयजग‍के‍ जलए‍52%‍ू,, आुके‍बाद‍ााजणजज्यक‍ईपयजग‍के‍जलए‍26%, औद्यजजगक‍ईपयजग‍के‍जलए‍12%, तथा‍ऄन्य‍ईपयजगों‍के‍ जलए‍10%‍(कृजी/लडैं स्ट्केप‍रखरखाा/परराून‍ऄाुंरचना‍रखरखाा‍अदद)‍ू।, ‍ददल्ली‍की‍ऄजधकतम‍मांग‍जपछल‍े 10 ाीों‍ में‍दजगुनी‍ूज‍गइ‍ू,, जज‍िूर‍की‍अबादी‍की‍तुलना‍में‍तेजी‍ुे‍बढ़‍रूी‍ू।, ‍ददल्ली‍म‍ें जबजली‍पारेीण‍नेटाकव‍म‍ें चार‍400‍ केाी‍और‍छिीु‍220‍केाी‍ुबस्ट्टेिन‍िाजमल‍ू।ैं ‍मौजूदा‍नेटाकव‍म‍ें ददल्ली‍की‍पररजध‍के‍चारों‍ओर‍400‍केाी‍ररग‍ िाजमल‍ू,, जज‍पूरे‍िूर‍म‍ें फ,ल‍े 220‍केाी‍नेटाकव‍ु‍े जुड़ा‍ुएअ‍ू।, ‍ातवमान‍म‍ें ददल्ली‍म‍ें ुालाना‍जबजली‍खपत‍30,197 एमयूएु‍ू।, ‍कुल‍आंस्ट्टाल्ड‍क्षमता‍7479.01 एमडब्ल्यू‍ू‍, और‍कुल‍आंस्ट्टाल्ड‍क्षमता‍में‍ुे‍78%‍जबजली‍खरीदी‍जाती‍ू,, जबदक‍िेी‍22%‍आंस्ट्टाल्ड‍क्षमता‍ददल्ली‍के‍भीतर‍ू।, ‍मौजूदा‍आंस्ट्टाल्ड‍क्षमता‍का‍कम्पजजजिन‍कजयला‍(59%), ग,ु‍ (28%), ूाआड्रज‍(10%)‍और‍ुौर‍(3%)‍ज,ुे‍ईत्पादन‍स्रजतों‍द्वारा‍ुंचाजलत‍ू।, ररन्यूऐबल‍परचेज‍ऑबजलगेिन‍(अरपीओ), और‍ुाथ‍ूी‍राज्य‍स्ट्तरीय‍ुौर‍नीजत‍2016‍के‍मा्यम‍ुे‍ऄजत‍मूत्ापूण‍व राष्ट्रीय‍नीजत,‍ाीव‍2022‍तक‍नाीकरणीय‍स्रजतों‍ुे‍लगभग‍20%‍जबजली‍की‍खपत‍कज‍पूरा‍करन‍े के‍जलए‍लक्ष्य‍जनधावररत‍ करती‍ू।, ‍एमएनअरइ‍द्वारा‍जनधावररत‍राष्ट्रीय‍स्ट्तर‍के‍लक्ष्यों‍कज‍पूरा‍करने‍की‍ददिा‍में‍ददल्ली‍कज‍ाीव‍2041‍तक‍ नाीकरणीय‍स्रजतों‍ुे‍ऄपनी‍जबजली‍की‍खपत‍लगभग‍50.5%1‍प्रजतित‍तक‍पूरी‍करनी‍ू।, ‍जाद्युत‍जाभाग‍द्वारा‍आंजगत‍ 1 ाीव 2030 तक 450 गीगााॉट नाीकरणीय उजाव आंस्ट्टाल्ड क्षमता के एमएनअरइ, भारत ुरकार के लक्ष्य ऄनुमान के अधार पर।88 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] दकए‍गए‍रुझानों‍के‍ऄनुुार, ाीव‍2041‍तक‍जबजली‍की‍खपत‍की‍मांग‍63,389‍एमय‍ू तक‍पुएचं न‍े का‍ऄनुमान‍ू।, ‍ ऄजधकतम‍मांग‍क्रमिः‍जतगनु ी‍‍और‍19,070 मेगाााट‍तक‍बढ़ने‍की‍ुंभााना‍ू।, ‍आुके‍अधार‍पर‍यू‍ऄनुमान‍लगाया‍ गया‍ू‍,दक‍कुल‍आंस्ट्टाल्ड‍क्षमता‍कज‍भी‍21,930 मेगाााट‍(ऄनमु ाजनत‍ऄजधकतम‍मागं ‍के‍लगभग‍15%)‍तक‍दज‍गुना‍बढ़ान‍े की‍अाश्यकता‍ूजगी। ाीव‍ जनुंख्या‍(जमजलयन)‍ जबजली‍की‍खपत‍की‍मागं ‍ ऄजधकतम‍मागं कुल‍ जमलाकर‍ (एमय)ू ‍ (एमडब्ल्यू)‍ आंस्ट्टाल्ड‍ क्षमता‍ (एमडब्ल्यू)‍ 2019 19 33,082 7,409 7,901 2031 24.7 47,167* 12,269 ** 14,110 2041 29.1 63,389 * 19,070 ** 21,930 *जबजली‍की‍खपत‍ाृजद्ध‍दर‍कज‍3 प्रजतित‍मानकर जडजजटल‍ऄाुरं चना‍और‍ुेााएं‍ददल्ली‍के‍जाकाु‍के‍जलए‍मुख्य‍िजि ‍के‍रूप‍में‍तेजी‍ुे‍ईभर‍रूी‍ू।ैं ‍अइुीटी‍और‍ आंटरनेट‍के‍्ापक‍रूप‍ु‍े फ,ल‍े ईपयजग‍न‍े मूत्ापूण‍व रूप‍ु‍े ज्यादातर‍ऐप-अधाररत‍ऄथव्ास्ट्था‍और‍ुेााओं‍कज‍ुंचाजलत‍ दकया‍ू।, ‍ुाावजजनक‍एजेंजुयों‍के‍ऄलााा, जनजी‍क्षेत्र‍आु‍िूर‍की‍ुेाा‍में‍एक‍बड़ी‍भूजमका‍जनभाता‍ू।, ‍ददल्ली‍कज‍राष्ट्रीय‍ जडजजटल‍ुंचार‍नीजत‍2018‍और‍भारतीय‍तार‍माग‍व के‍ऄजधकार‍जनयम, 2016‍(टेलीग्राम‍राआट‍ऑफ‍ाे‍रूल्ु‍2016)‍के‍ ऄनुपालन‍म‍ेंऄपने‍दरू ुंचार‍ुबं ंधी‍अधाररक‍ुंरचनात्मक‍ढाचं े‍और‍लक्ष्यों‍कज‍ुंरेजखत‍करन‍े की‍अाश्यकता‍ू।, ाीव‍2019‍म,ें ददल्ली‍म‍ें 57‍जमजलयन‍टेलीकॉम‍कनेक्िन‍थ,े जजुमें‍ुे‍54‍जमजलयन‍ाायरलुे ‍कनेक्िन्ु‍ू‍ैं जज‍जनजी‍और‍ ुरकारी‍एजेंजुयों, दजनों‍द्वारा‍प्रदान‍दकए‍गए‍थे।‍ुाावजजनक‍क्षत्रे ‍(एमटीएनएल)‍म‍ें ाायरलाआन‍कनेक्िन‍का‍लगभग‍ 46%‍जूस्ट्ुा‍और‍ाायरलेु‍कनेक्िन‍का‍केाल‍4.3%‍जूस्ट्ुा‍ू।, ‍ददल्ली‍के‍एनुीटी‍की‍कुल‍टेली-घनत्ा‍दिे ‍के‍जलए‍ ुमग्र‍टेली-घनत्ा‍के‍मुकाबल‍े राष्ट्रीय‍स्ट्तर‍के‍औुत‍254.49‍ु‍े काफी‍ऄजधक‍ू‍, जज‍91.64‍ू।, ‍ददल्ली‍म‍ें करीब‍32‍ जमजलयन‍आंटरनेट‍ग्राूक‍ू‍ैं जज‍दरू ुंचार‍टाारों‍के‍्ापक‍नटे ाकव‍द्वारा‍ुमर्नथत‍ू,ैं जजनमें‍ु‍े ऄजधकांि‍जनजी‍तौर‍पर‍ प्रबंजधत‍ू|ैं गु, ‍ऄाुरं चनाः‍राष्ट्रीय‍राजधानी‍क्षेत्र‍ददल्ली‍म‍ें प्राकृजतक‍गु, ‍के‍जातरण‍के‍जलए‍नेटाकव‍जबछाने‍के‍जलए‍आंद्रप्रस्ट्थ‍ग,ु‍ जलजमटेड‍(अइजीएल)‍प्राजधकृत‍और‍जजम्मेदार‍ू।, ‍प्राकृजतक‍गु, ‍का‍्ापक‍रूप‍ु‍े परराून‍क्षेत्र‍द्वारा‍ुंपीजड़त‍प्राकृजतक‍ ग,ु‍(ुीएनजी)‍के‍रूप‍म,ें घरेलू‍और‍ााजणजज्यक‍क्षेत्रों‍द्वारा‍पाआप्ड‍न,चुरल‍ग,ु‍(पीएनजी)‍के‍रूप‍म‍ें और‍ईद्यजगों‍द्वारा‍ अर-एलएनजी‍अपूर्नत‍के‍रूप‍में‍ईपयजग‍दकया‍जाता‍ू।, ‍जाजभन्न‍रूपों‍म‍ें प्राकृजतक‍ग,ुों‍के‍ईपयजग‍ु‍े ददल्ली‍म‍ें प्रदीू ण‍के‍ स्ट्तर‍म‍ें काफी‍कमी‍अएगी।‍ददल्ली‍के‍कुल‍घरों‍का‍लगभग‍25%‍पाआप्ड‍ग,ु‍नेटाकव‍द्वारा‍जुड़ा‍ुएअ‍ू।, ‍ूालांदक, 50%‍ु‍े ऄजधक‍ददल्ली,‍एनुीटी‍कज‍अइजीएल‍द्वारा‍पीएनजी‍नेटाकव‍में‍ाृजद्ध‍के‍जलए‍तकनीकी‍रूप‍ुे‍ऄयजग्य‍जचजन्ूत‍माना ‍गया‍ू।, ाीव‍2030‍तक, केन्द्र‍ुरकार‍का‍लक्ष्य‍भारत‍कज‍ग,ु‍अधाररत‍ऄथव्ास्ट्था‍बनाना‍ू‍, आु‍प्रकार‍उजाव‍क्षेत्र‍में‍प्राकृजतक‍ ग,ु‍की‍जूस्ट्ुेदारी‍कज‍मौजूदा‍6%‍ुे‍15%‍तक‍बढ़ान‍े का‍लक्ष्य‍ू।, ‍आुी‍क्रम‍में‍ददल्ली‍पीएनजी‍और‍ुीएनजी‍ज,ु‍े स्ट्ाच्छ‍ ईंधन‍के‍ईपयजग‍पर‍ऄजधक‍जजर‍दगे ी, और‍प्रदीू णकारी‍ईंधन‍के‍ईपयजग‍कज‍बढ़ााा‍नूीं‍देगी।‍अइजीएल‍प्रजजेक्िन‍ु‍े पता‍चलता‍ू‍, दक‍ददल्ली‍कज‍ाीव‍2025‍तक‍ऄनुमाजनत‍7.32‍एमएमएुुीएमडी‍ग,ु‍की‍मात्रा‍की‍अाश्यकता‍ूजगी, और‍आु‍मांग‍कज‍परू ा‍करने‍के‍जलए‍ाी‍व2025‍तक‍110‍नए‍ुीएनजी‍स्ट्टेिनों‍कज‍स्ट्थाजपत‍करने‍की‍यजजना‍ू।, अपदा‍की‍तय, ारी‍एा‍ं प्रजतरजधकताः‍ददल्ली‍भूकंपीय‍क्षेत्र‍IV‍और‍V‍में‍अता‍ू,, और‍यू‍भूकंप‍और‍बाढ़‍ज,ुी‍प्राकृजतक‍ अपदाओं‍के‍ुाथ-ुाथ‍अग, औद्यजजगक‍और‍राुायजनक‍खतरों, बाढ़, आमारत‍ढून,े ुड़क‍दघु वटनाओं, जल‍जमाा‍अदद‍ ज,ुी‍माना-प्रेररत‍अपदाओं‍के‍प्रजत‍भी‍बेूद‍ुंाेदनिील‍ू।,[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 89 यमुना‍और‍नजफगढ़‍ड्रेन-जुस्ट्टम‍में‍बाढ़‍के‍कारण‍जपछल‍े कुछ‍ुमय‍ुे‍आु‍िूर‍कज‍जाजभन्न‍पररमाणों‍की‍बाढ़‍का‍ुामना‍ करना‍पड़ा‍ू।, यमुना‍ने‍जपछल‍े 35‍ाीों‍के‍दौरान‍ऄपन‍े खतरे‍के‍स्ट्तर‍(204.83‍मीटर‍पर‍जनधावररत)‍कज‍छब्बीु‍बार‍पार‍ दकया।‍1900‍के‍बाद‍ु,े ददल्ली‍ने‍1995, 2010‍और‍2013‍म‍ें ूाल‍की‍बाढ़ों‍ुजूत‍नौ‍बड़ी‍बाढ़ों‍का‍ऄनुभा‍दकया‍ू।, ददल्ली‍ऄजग्निमन‍ुेाा‍अंकड़ों‍के‍ऄनुुार, ददल्ली‍म‍ें जागत‍पांच‍ाीों‍के‍दौरान‍75,000‍अग‍लगन‍े की‍घटनाएं‍ुएइ‍ू‍ैं जजुके‍पररणामस्ट्ारूप‍1,500‍ुे‍ऄजधक‍जान‍ें गईं, 7,600‍ुे‍ऄजधक‍लजग‍घायल‍ुएए‍और‍176‍करजड़‍रुपए‍ु‍े ऄजधक‍की‍ लागत‍की‍ुंपजि‍का‍नुकुान‍ुएअ‍ू।, ‍आन‍घटनाओं‍म‍ें पांच‍प्रमुख, पच्चीु‍गंभीर‍और‍जनन्यानाे‍म्यम‍अग‍िाजमल‍ू।ैं ‍ जपछले‍5‍ाीों‍के‍दौरान, ददल्ली‍म‍ें जेज‍े कॉलजजनयों‍म‍ें अग‍की‍घटनाओं‍की‍ुंख्या‍म‍ें 49%‍की‍ाृजद्ध‍देखी‍गइ‍ू‍, और‍आनम‍ें ु‍े 70%‍ु‍े ऄजधक‍मामले‍जबजली‍के‍कारणों‍(मुख्य‍रूप‍ु‍े िॉट-व ुर्दकरटग)‍ु‍े ईत्पन्न‍ूजने‍का‍ऄनुमान‍ू।, ‍ददल्ली‍म‍ें ऄजधकांि‍जबलल्डग‍स्ट्टॉक‍की‍जािेीता‍ईन‍आमारतों‍की‍ू‍, जज‍बड़े‍पम, ान‍े पर‍ऄनजधकृत‍जनमावण‍और‍जबलल्डग‍बायलॉज‍का‍ पालन‍न‍करने‍के‍कारण‍ऄुरु जक्षत‍ू।ैं ‍ददल्ली‍म‍ें अग‍की‍घटनाओं‍के‍मख्ु य‍कारणों‍के‍रूप‍म‍ें ग,ु‍ररुाा‍और‍जबजली‍की‍ खराबी‍की‍पूचान‍की‍गइ‍ू।, ददल्ली‍अपदा‍प्रबंधन‍प्राजधकरण‍(डीडीएमए)‍द्वारा‍त,यार‍‘ददल्ली‍अपदा‍प्रबंधन‍यजजना’ (डीडीएमपी)‍न‍े जाजभन्न‍प्रकार‍की‍अपदाओं‍ूते ु‍ददल्ली‍म‍ें ुां ेदनिील‍क्षेत्रों, कालजजनयों, बजस्ट्तयों‍की‍पूचान‍की‍ू‍, और‍ ईन्ू‍ें ुूचीबद्ध‍दकया‍ू,, ुाथ‍ूी‍आुन‍े ुंरचनात्मक‍ुरु क्षा, अग‍ुुरक्षा, जबजली‍ुुरक्षा‍आत्यादद‍के‍जलए‍अाजधक‍ुुरक्षा‍ ऑजडट‍की‍भी‍जुफाररि‍की‍ू,, जजुका‍ुंचालन‍स्ट्थानीय‍जनकायों‍और‍ुंबंजधत‍एजेंजुयों‍द्वारा‍ददल्ली‍के‍जलए‍अपदा‍ ुंबंधी‍त,याररयां‍करन‍े के‍जलए‍दकया‍जाएगा। अगामी‍बीु‍ाीों‍में, ददल्ली‍की‍अधाररक‍ुंरचना‍एक‍ऄप्रत्याजित‍दबाा‍का‍ुामना‍करेगी‍और‍आुजलए‍आुे‍ईभरती‍ जरूरतों‍के‍प्रजत‍ईिरदायी‍और‍प्रघात‍और‍तनाा‍के‍प्रजत‍प्रजतरजधक, दजनों‍ूजना‍चाजूए।‍आुजलए, मुख्य‍्यान‍मजबूत‍ और‍प्रजतरजधी‍अधाररक‍ुरं चना‍ुेााओं‍के‍प्रााधान‍का‍करते‍ुएए‍एक‍स्ट्थायी‍और‍ुंुाधन-कुिल‍ााताारण‍त,यार‍करना‍ ू।, आु‍खंड‍म‍ें जल‍अपूर्नत‍और‍स्ट्ाच्छता, स्ट्थायी‍और‍कुिल‍ऄपजिष्ट‍प्रबंधन, स्ट्ाच्छ‍उजाव,‍मजबूत‍जडजजटल, ुंचार‍और‍गु, ‍ अधाररत‍ऄाुंरचना, अपदा‍त,यारी‍तथा‍ददल्ली‍की‍प्रजतरजधकता‍ूते ‍ु जनम्नजलजखत‍चार‍ऄ्यायों‍में‍कायनव ीजतया‍ं दी‍गइ‍ ू‍ैं: INF1‍-‍ददल्ली‍कज‍जल‍ुरु जक्षत‍बनाना:‍जल, ऄपजिष्ट‍जल‍और‍जल‍जनकाुी INF2‍-‍ठजु‍ऄपजिष्ट‍का‍कुिलतापाू कव ‍प्रबधं न‍करना INF3‍-‍जबजली, गु, ‍और‍दरू ुचं ार-जडजजटल‍ऄाुरं चना INF4‍-‍अपदा‍की‍तय, ारी‍एा‍ंप्रजतरजधकता90 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 13.0 ‍ददल्ली‍कज‍जल‍ुरु जक्षत‍बनानाः ऄ्याय कजड INF1 जल, ऄपजिष्ट‍जल‍और‍जल‍जनकाुी 13.1.1 ददल्ली‍की‍जाकाु‍क्षमता‍यूां‍पानी‍की‍ईपलब्धता‍ु‍े जड़ु ी‍ुएइ‍ू।, ‍यू‍िूर‍पानी‍के‍बाूरी‍स्रजतों‍पर‍ ऄत्यजधक‍जनभवर‍ू,, और‍ईपलब्ध‍पानी‍की‍मात्रा‍भजाष्य‍की‍मांगों‍कज‍पूरा‍करन‍े के‍जलए‍ऄपयावप्त‍ू।, ‍आुजलए, दीघवकाजलक‍तौर‍पर‍जल‍ुुरक्षा‍प्राप्त‍करना‍ुबुे‍प्रमुख‍क्षेत्रों‍में‍ुे‍एक‍ू,, जजुमें‍जनम्नजलजखत‍की‍पररकल्पना‍ की‍गइ‍ूः, i) पयावप्त‍मात्रा‍में‍पानी‍की‍जनरंतर‍ईपलब्धता, जज‍ातवमान‍और‍भजाष्य‍की‍जरूरतों‍कज‍पूरा‍करने‍के‍ जलए‍जनधावररत‍गुणािा‍मानकों‍कज‍पूरा‍करती‍ू,, ii) बाढ़‍के‍प्रजत‍बेूतर‍प्रजतरजधकता। 13.1.2 यू‍यजजना‍एक‍एकीकृत‍िूरी‍जल‍प्रबंधन‍दजृ ष्टकजण‍का‍ुमथवन‍करती‍ू,, और‍तीन‍प्रमुख‍जल-ुंबंजधत‍ अधारभूत‍ुंरचनाओं‍के‍क्षेत्रों‍में‍परस्ट्पर‍एक-दुू रे‍ु‍े जुड़ी‍कायव‍नीजतयां‍प्रदान‍करती‍ू,, ज,ुे‍दक‍पानी‍की‍ अपूर्नत, ुीारेज‍और‍जलजनकाुी।‍ूालांदक‍आु‍दजृ ष्टकजण‍के‍तूत‍आन्टराेंिन‍ुे‍यू‍िूर‍जल‍ुुरजक्षत‍ूजन‍े की‍ ददिा‍म‍ें अग‍े बढ़‍ुकता‍ू,, ाूीं‍ुंबंजधत‍प्राजधकाररयों‍द्वारा‍आु‍िूर‍की‍अाश्यकता‍कज‍पूरा‍करन‍े के‍जलए‍ ऄंतर-राज्यीय‍करारों‍के‍मा्यम‍ुे‍कच्चे‍पानी‍की‍प्राजप्त‍के‍जलए‍जनरंतर‍प्रयाु‍दकए‍जाएंगे। 13.2 मीठे‍पानी‍की‍मागं ‍कज‍कम‍करना 13.2.1 ददल्ली‍जल‍बजडव‍ुेाा‍यजजना‍के‍ऄनुुार, मीठे‍पानी‍की‍अपूर्नत‍कज‍केाल‍पीन‍े यजग्य‍ईपयजग‍के‍जलए‍जनधावररत‍ करके‍और‍तकवुगं त‍बनात‍े ुएए‍पानी‍की‍अपूर्नत‍के‍जलए‍प्रजत-्जि ‍मानदंड‍कज‍60 जीपीुीडी‍ुे‍50 तक‍कम‍ दकया‍जाएगा।‍नए‍जाकाु‍म‍ें पानी‍की‍आु‍अपूर्नत‍कज‍और‍कम‍दकया‍जाएगा।‍आु‍क्रम‍म‍ें कमी‍कज‍लाग‍ू करन‍े के‍जलए‍मागं ‍प्रबधं न‍कायनव ीजतयों‍कज‍आु‍ऄ्याय में‍जास्ट्तार‍पूावक‍ार्नणत‍दकया‍गया‍ू।, 13.2.2 पानी‍की‍कमी‍कज‍दरू ‍करन‍े ूते ‍ु जल‍अपर्नू त‍यजु ि ुगं त‍बनानाः‍आु‍यजजना‍की‍जाजभन्न‍नीजतयों‍के‍तूत‍नए‍ जाकाु‍में‍जल‍अपूर्नत‍कज‍जल‍ुंुाधनों‍पर‍ऄजतररि ‍तनाा/दबाा‍कज‍कम‍करने‍के‍जलए‍जनयंजत्रत‍दकया‍ जाएगाः i) पानी‍की‍मांग‍के‍ुंदभव‍में‍लडैं ‍पूललग‍क्षेत्रों‍के‍भीतर‍जाकाु‍स्ट्थायी‍ूजगा, और‍जल‍ुंरक्षण‍ुुजाधाओं‍ कज‍ुेक्टर‍लेअईट‍और‍भान‍जडजाआन‍म‍ें ऄतं र्ननर्नमत‍दकया‍जाएगा।‍लडैं ‍पूललग‍क्षेत्रों‍म‍ें प्रजत‍्जि ‍जल‍ अपूर्नत‍40‍जीपीुीडी‍तक‍ुीजमत‍रूगे ी‍(देख:ें ‍डीइाी1)। ii) ूररत‍जाकाु‍क्षेत्रों‍म‍ें पानी‍की‍मांग‍की‍पूर्नत‍ज्यादातर‍िजजधत‍ऄपजिष्ट‍जल‍ुे‍दकए‍जान‍े का‍ऄनुमान‍ ू।, (देख:ें‍डीइाी2) iii) पुनरूद्धार‍यजजनाओं‍और‍टीओडी‍यजजनाओं‍कज‍मौजूदा‍अाश्यकता‍ुे‍ऄजधक‍पानी‍की‍अपर्नू त‍नूीं‍की‍ जाएगी, जुााए‍आु‍यजजना‍के‍भीतर‍दकुी‍खाली‍जमीन/नों, जजुके‍जलए‍50‍जीपीुीडी‍की‍दर‍ु‍े ऄजतररि ‍पानी‍की‍अपूर्नत‍प्रदान‍की‍जाएगी। 13.2.3 गर, -पीन‍े यजग्य‍ईपयजगों‍ूते ‍ु िजजधत‍ऄपजिष्ट‍जलः‍ऄपजिष्ट‍जल‍के‍100%‍िजधन‍और‍ऄजधकतम‍पुनःईपयजग‍ कज‍मौजूदा‍जाकाु‍में‍बढ़ााा‍ददया‍जाएगा, और‍आु‍े नए‍जाकाु‍में‍ऄजनाायव‍दकया‍जाएगाः[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 91 i) यूबीबीएल‍के‍ऄनुुार‍न्यूनतम‍ुीमा‍ुे‍ऄजधक‍जडस्ट्चाजव‍के‍ुाथ, दजूरी‍पाआलपग‍युि ‍जाकेन्द्रीकृत‍ ऄपजिष्ट‍िजधन‍जल‍प्रणाली‍दकुी‍भी‍नए‍जाकाु/पररयजजना‍के‍ऄनुमजदन‍के‍जलए‍ऄजनाायव‍ूजगी। ii) ूररत‍जाकाु‍क्षेत्र‍म,ें ुभी‍प्लॉट/जीडीए‍यजजनाओं‍के‍जलए‍ऄलग-ऄलग‍या‍ुाझा‍जाकेंद्रीकृत‍िजधन‍ आकाआयों‍कज‍ुस्ट्ं थाजपत‍करना‍ऄजनाायव‍ूजगा, भले‍ूी‍आुके‍जडस्ट्चाजव‍की‍मात्रा‍दकतनी‍भी‍ूज। iii) जाकेंद्रीकृत‍िजधन‍आकाआयों‍कज‍एकल‍या‍कइ‍भानों/प्लाटों‍के‍जलए, या‍यजजना/ुेक्टर‍लअे ईट‍के‍जलए‍ एक‍ुाझा‍ुुजाधा‍के‍रूप‍में‍ुस्ट्ं थाजपत‍दकया‍जा‍ुकता‍ू।, ‍केाल‍ऐुी‍ुुजाधाओं‍कज‍स्ट्थाजपत‍करन‍े के‍ जलए‍जनर्नमत‍की‍गइ‍ुंरचनाएं‍एफएअर‍और‍ग्राईंड‍कार‍अाश्यकताओं‍ु‍ेमुि ‍ूोंगी। iv) ुाझा‍जुस्ट्टम‍प्लॉरटड‍जाकाु‍ऄथाा‍आमारतों‍के‍ुमूू‍के‍जलए‍भी‍एक‍क्लस्ट्टर‍स्ट्तर‍पर‍ुस्ट्ं थाजपत‍ दकए‍जा‍ुकते‍ू।ैं v) यूबीबीएल‍के‍ऄनुुार‍पीने‍यजग्य‍पानी‍की‍अपूर्नत‍के‍जलए‍और‍ररुाआदकल‍दकए‍गए‍पानी‍के‍जलए‍ ऄलग-ऄलग‍पाआपों‍के‍ुाथ‍िजजधत‍ऄपजिष्ट‍जल‍के‍ईपयजग‍करन‍े के‍प्रााधान‍ुभी‍नए‍जाकाु‍के‍जलए‍ ऄजनाायव‍ूोंगे। vi) पानी‍का‍कजइ‍भी‍नया‍कनेक्िन‍प्रदान‍करन‍े ुे‍पूल‍ेदजूरी‍पाआलपग‍का‍प्रााधान‍दकया‍जाएगा। vii) यूबीबीएल‍द्वारा‍जनधावररत‍न्यनू तम‍ुीमा‍ुे‍उपर‍जडस्ट्चाजव‍ााले ुभी‍मौजूदा‍ुरकारी, पीएुपी‍और‍ ााजणजज्यक‍भान/प्लॉट‍(स्ट्थानीय‍स्ट्तर‍की‍ुुजाधाओं‍कज‍छजड़कर), जाकेन्द्रीकृत‍ऄपजिष्ट‍प्रबंधन‍और‍ दजूरी‍पाआलपग‍के‍जलए‍ुमयबद्ध‍तरीके‍ु‍े्ाूायवता‍के‍ऄनुु ार‍आुमें‍पररार्नतत‍ूोंगे। viii) डीजेबी‍मौजूदा‍अााुीय‍ईपभजि ाओं‍कज‍जल‍पुनचवक्रण‍ुजु ाधाओं‍में‍पररार्नतत‍ूजने‍की‍ुुजाधा‍दे‍ ुकता‍ू।, 13.2.4 कम‍पानी‍की‍खपत‍ााल‍े प्ललं बग‍दफक्ुचुःव ‍पानी‍की‍बचत‍(ुंरक्षण)‍के‍जलए‍यूबीबीएल‍द्वारा‍जनधावररत‍कम‍ पानी‍की‍खपत‍ााले‍प्लंलबग‍दफक्ुचुव‍स्ट्थाजपत‍करना, जनम्नजलजखत‍जाकाुों‍के‍जलए‍ऄजनाायव‍ूजगाः i) ुभी‍नए‍जाकाुों‍और‍पुनरूद्धार‍पररयजजनाओं‍के‍जलए। ii) ुभी‍मौजूदा‍ुरकारी, ्ााुाजयक‍और‍पीएुपी‍भानों/प्लॉट‍(स्ट्थानीय‍ुुजाधाओं‍कज‍छजड़कर)‍के‍ जलए। 13.2.5 ुभी‍ुंबंजधत‍एजेंजुयां‍दीघवकाजलक‍जल‍जस्ट्थरता‍ूते ु‍नागररकों‍और‍जाजभन्न‍जूतधारकों‍कज‍पानी‍के‍प्रजत‍ ुंाेदनिील‍्ाूार‍ऄपनाने‍के‍जलए‍प्रजत्ुाजूत‍करेंगी। 13.3 िूर‍म‍ेंईत्पन्न‍ऄपजिष्ट‍जल‍का‍बड़ी‍मात्रा‍म‍ेंपनु ःईपयजग‍ 13.3.1 ददल्ली‍जल‍बजड‍व और‍ुंबंजधत‍एजेंजुयााँ‍िूर‍म‍ें ईत्पन्न‍ुभी‍प्रकार‍के‍ऄपजिष्ट‍जल‍का‍िजधन‍ुुजनजित‍ करेगी, क्योंदक‍केाल‍ऄपजिष्ट‍जल‍कज‍ूी‍नालों‍या‍जलजनकायों‍में‍प्रााजूत‍करन‍े की‍ऄनुमजत‍दी‍जाएगी।‍ आुके‍जलए‍िजधन‍क्षमता‍म‍ें ाृजद्ध, ऄनजुाड‍व क्षेत्रों‍के‍बेूतर‍कारेज‍के‍मा्यम‍ु‍े ऄपजिष्ट‍जल‍का‍ऄजधकतम‍ ुंग्रू, आंटरुेप्टर‍ुीारों‍की‍स्ट्थापना, और‍ऄन्य‍ईपयि ु ‍तरीकों‍के‍कायावन्ायन‍की‍अाश्यकता‍ूजगी। 13.3.2 ददल्ली‍जल‍बजडव‍ऄजधकतम‍पुनःईपयजग‍ूते ‍ु िजजधत‍ऄपजिष्ट‍जल‍की‍ईपलब्धता‍ुुजनजित‍करेगी, और‍ ऄपजिष्ट‍जल‍के‍पुनःईपयजग‍कज‍बढ़ाने‍के‍जलए‍एक‍चरणबद्ध‍यजजना‍त,यार‍करेगी, जजुमें‍ऄजधक‍ुंख्या‍म‍ें जनम्नजलजखत‍ईपयजग‍िाजमल‍ूोंगेः i) ुमय-ुमय‍पर‍प्राजधकृत‍एजेंुी‍द्वारा‍जनधावररत‍पयावारणीय‍प्रााू‍की‍अाश्यकताओं‍के‍ऄनुुार, नदी‍ में‍िजजधत‍पानी‍कज‍छजड़ना।92 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ii) िूर‍की‍जाजभन्न‍झीलों‍और‍जल‍जनकायों‍म‍ेंपानी‍की‍गुणािा‍का‍पुननवाीकरण‍और‍जनरंतर‍रखरखाा। iii) प्राकृजतक‍नालों, ज,ा‍जाजाधता‍पाकों‍और‍लडैं ‍पूललग‍क्षेत्रों‍के‍ुाथ‍यमनु ा‍नदी‍के‍बाढ़‍के‍म,दानों‍म‍ें एक्वीफर‍ररचाजव‍तालाबों‍और‍झीलों‍कज‍जाकजुत‍करके‍िजजधत‍ऄपजिष्ट‍जल‍के‍ईपयजग‍ुे‍भूजल‍ पुनभवरण। iv) बागाानी, लुचाइ, बु/मेरज/रेल‍के‍जडब्बों‍और‍ााूनों‍की‍ुफाइ, ुड़क‍की‍ुफाइ‍अदद‍के‍जलए‍तथा‍ जूााँ‍तक‍ुंभा‍ूज,‍ऄजग्निमन‍और‍जनमावण‍कायों‍के‍जलए‍िजजधत‍ऄपजिष्ट‍जल‍का‍ईपयजग।‍जीडीए‍म‍ें जाकाु‍के‍जलए‍भी‍पुनचवदक्रत‍पानी‍का‍भारी‍मात्रा‍में‍ईपयजग‍दकया‍जाएगा।‍(देख:ें‍डीइाी2) औद्यजजगक‍ प्रदक्रयाओं‍के‍जलए‍िजजधत‍ऄपजिष्ट‍जल‍का‍ईपयजग‍करना‍ऄजनाायव‍ूजगा, पीन‍े यजग्य‍पानी‍के‍ईपयजग‍ की‍ऄनुमजत‍नूीं‍ूजगी। 13.4 बरुाती‍जल‍के‍प्रजतधारण‍कज‍बढ़ाना 13.4.1 एक‍ऄन्य‍मूत्ापूणव‍आंटराेंिन‍बरुाती‍जल‍के‍ऄपााू‍कज‍कम‍करना‍ू,, और‍ाीाव‍जल‍का‍चाू‍े तज‍ुीधे‍ूी‍ भंडारण‍के‍मा्यम‍ुे‍ऄथाा‍भजू ल‍पनु भवरण‍के‍मा्यम‍ुे‍ऄजधकतम‍ईपयजग‍करना‍ू।, ‍ 13.4.2 जनम्नजलजखत‍कायनव ीजतयों‍कज‍लागू‍दकया‍जाएगाः i) ुभी‍नए‍जाकाुों‍में‍बड़े‍पाकव‍और‍खलु े‍स्ट्थान, जनचले‍आलाकों‍में‍जस्ट्थत‍ूोंग,े तादक‍बाढ़‍ुभं ाजात‍ क्षेत्रों‍में‍पुनभरव ण‍कज‍ुुजनजित‍दकया‍जा‍ुके‍और‍जनमावण‍कज‍रजका‍जा‍ुके। ii) ग्रीनफील्ड‍या‍रीजनरेिन‍लअे ईट‍यजजनाओं‍म‍ें ुामान्य‍ुाझा‍पुनभरव ण‍अधारभूत‍ुंरचना‍के‍रूप‍म‍ें ाीावजल‍का‍ुंचयन‍दकया‍जाएगा। iii) बागाानी‍की‍जरूरतों‍कज‍पूरा‍करन‍े के‍जलए‍बरुाती‍जल‍के‍ुीधे‍ईपयजग‍ूते ‍ु बड़े‍प,मान‍े पर‍स्ट्टजरेज‍ (भंडारण)‍का‍जनमावण‍करन‍े के‍जलए‍जीडीए‍के‍भीतर‍जाकाु‍कज‍प्रजत्ुाजूत‍दकया‍जाएगा। iv) ुभी‍नए‍लेअईट‍यजजनाओं‍और‍क्षेत्र‍ुुधार‍पररयजजनाओं‍ूते ‍ु जल‍ुंाेदनिील‍िूरी‍जडजाआन‍ (डब्ल्यूएुयूडी)‍जुद्धांतों‍कज‍ऄपनाकर‍िूर‍भर‍में‍पानी‍ुजखने‍ााली‍ुतूों‍का‍ुुधार।‍बायजस्ट्ाेल्ु, ाेजीटेटेड‍दफल्टर, पानी‍ुजखने‍ााले‍बरुाती‍जल‍नाल,े ाीाव‍ईद्यान, ऄधव-पानी‍ुजखने‍ााली‍फुटपाथ‍ और‍ुाावजजनक‍पार्ककग‍क्षेत्र‍अदद‍ज,ु‍े ऄायाों‍कज‍ुाावजजनक‍क्षेत्रों‍म‍ें जमीन‍की‍जस्ट्थजत‍के‍ऄनुुार‍ ऄपनाया‍जाएगा।‍(देख:ें‍इएनाी1‍और‍एचुीपी1) v) नए‍क्षेत्रों‍में‍बरुाती‍जल‍के‍नेटाकव‍की‍जडजाआन‍यू‍ुुजनजित‍करेगी‍दक‍बरुाती‍जल‍का‍कम‍ुे‍ कम‍एक‍पयावप्त‍जूस्ट्ुा‍मौजूदा/ईपयुि ‍भूजल‍पनु भवरण‍स्ट्थलों‍में‍जनदेजित/प्रााजूत‍दकया‍जाए। vi) कुछ‍स्ट्थानों‍म‍ें ज,ा-जलजनकाुी‍का‍ईपयजग‍दकया‍जा‍ुकता‍ू,‍जजुुे‍दक‍नददयों, प्राकृजतक‍नालों‍ और‍झीलों‍के‍जलए‍बफुव‍जडजाआन‍की‍जा‍ुके‍और‍मानुून‍के‍दौरान‍िूर‍के‍जलए‍प्राकृजतक‍स्ट्पंज‍ का‍जनमावण‍ूज‍ुके।‍(देख:ें‍इएनाी2) 13.4.3 भूजल‍पुनभवरण‍के‍जलए‍कायनव ीजतयां‍भूजल‍जनकाुी‍ूते ु‍कठजर‍जाजनयमनों‍द्वारा‍पूरक‍ूजगी।‍ददल्ली‍जल‍बजडव‍ म‍ें पंजीकृत‍नलकूपों‍के‍ऄलााा‍ऄन्य‍बजराले ‍ुे‍जनकाुी‍कज‍ऄा,ध‍माना‍जाएगा। 13.5 जल‍प्रणाजलयों‍की‍दक्षता‍म‍ेंुधु ार 13.5.1 ददल्ली‍की‍जल‍ईपलब्धता‍और‍मांग‍प्रबंधन‍कायनव ीजतयों‍कज‍आुकी‍कइ‍प्रणाजलयों‍में‍ुुधार‍लाकर‍बढ़ाया‍जा‍ ुकता‍ू,, जजुम‍ें जनम्नजलजखत‍िाजमल‍ू:ैं[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 93 i) ग,र-राजस्ट्ा‍जल‍(एनअरडब्ल्य)ू ‍कज‍कम‍करना, 24X7‍जनरंतर‍पानी‍की‍अपूर्नत‍और‍स्ट्माटव‍मीटररग‍प्रणाली‍ कज‍ऄपनाना। ii) ऄजनयजजजत/ऄनजधकृत‍कॉलजजनयों‍में‍ऄलग-ऄलग‍्जि यों, परराारों‍कज‍मीटरीकृत‍पानी‍के‍कनेक्िन‍प्रदान‍ करना। iii) पानी‍के‍ग,र-जजम्मेदार‍आस्ट्तेमाल‍कज‍रजकने‍के‍जलए‍टेजलस्ट्कजजपक‍मूल्य‍जनधावरण‍पद्धजत‍का‍ईपयजग‍लाग‍ू करना। iv) ऄजधक‍अबादी‍ााली‍कॉलजजनयों‍म‍ें जूां‍ुीारेज‍नेटाकव‍कज‍लाग‍ू दकया‍जाना‍ुंभा‍नूीं‍ू,, डीजेबी‍ऐु‍े स्ट्थानों‍म‍ें ुेजप्टक‍टैंक‍की‍अाजधक‍ुफाइ‍और‍मल‍कीचड़‍प्रबंधन‍के‍जलए‍ुंस्ट्थागत‍तंत्र‍स्ट्थाजपत‍करेगा।‍ मौजूदा‍एुटीपी‍का‍ईपयजग‍मलीय‍गाद‍के‍िजधन‍के‍जलए‍दकया‍जा‍ुकता‍ू,, और‍डीजेबी‍एुटीपी‍म‍ें मलीय‍गाद‍के‍स्ट्थानांतरण‍और‍िजधन‍ूते ु‍एक‍तंत्र‍स्ट्थाजपत‍करेगा।‍ऄपजिष्ट‍जल‍िजधन‍के‍ईप-ईत्पादों‍का‍ प्रुंस्ट्करण‍के‍ईपरान्त‍ईपयि ु ‍िजधन‍दकया‍जाएगा, और‍ुड़क‍जनमावण‍या‍दकुी‍ऄन्य‍ईपयुि ‍ईपयजग‍के‍ जलए‍आन्ू‍ेंपुनचवकृत‍(री-ुाआदकल)‍दकया‍जाएगा। --- x --- x ---- x --- x --- ऄ्याय कजड 14.0 ठजु‍ऄपजिष्ट‍का‍कुिलतापाू कव ‍प्रबधं न INF2 14.1.1 ुतत‍जाकाु‍के‍प्रजत‍ददल्ली‍की‍प्रजतबद्धता‍बुएत‍ूद‍तक‍ऄपने‍ुंुाधनों‍के‍ुंरक्षण‍और‍ऄपजिष्ट‍का‍कुिल‍ प्रबंधन‍करने‍की‍क्षमता‍पर‍जनभवर‍ू।, ‍यू‍िूर‍पयावारण‍के‍जलूाज‍ुे‍ाूनीय‍तरीके‍ुे‍जजतने‍ऄपजिष्ट‍का‍ प्रुंस्ट्करण‍कर‍ुकता‍ू,, ईुुे‍कूीं‍ऄजधक‍ऄपजिष्ट‍ईत्पन्न‍करता‍ू।, ‍आु‍ऄंतर‍कज‍पाटन‍े की‍अाश्यकता‍ू‍, तादक‍"ऄप्य‍कम--ुंुाधन‍ऄजधक"‍की‍ददिा‍में‍बढ़ा‍जा‍ुके।‍स्ट्थायी‍और‍कुिल‍ऄपजिष्ट‍प्रबंधन‍प्रणाली‍ और‍ुकुवलर‍आकजनॉमी‍जुद्धांतों‍कज‍ऄपनाने‍के‍जलए‍एक‍ुामान्य‍कायवनीजतक‍ढांचे‍की‍पररकल्पना‍की‍गइ‍ू:, i) ऄपजिष्ट‍के‍काफी‍बड़े‍जूस्ट्ुे‍का‍स्ट्थानीय‍स्ट्तर‍पर‍प्रबंधन‍ूज ii) ऄपजिष्ट‍की‍ऄजधक‍मात्रा‍ुंुाधन‍के‍रूप‍में‍प्राप्त‍ूज iii) ऄपजिष्ट‍कज‍कम‍ु‍ेकम‍पयावारणीय‍प्रभाा‍के‍ुाथ‍ुंुाजधत‍और‍जनपटाया‍जाए 14.1.2 आु‍ऄ्याय‍म‍ें ददल्ली‍म‍ें ईत्पन्न‍ूजन‍े ााल‍े ठजु‍ऄपजिष्ट‍के‍दजनों‍रूपों‍ऄथावत‍नगरपाजलका‍के‍ठजु‍ऄपजिष्ट‍ (एमएुडब्ल्यू)‍और‍नगरपाजलका-आतर‍ऄपजिष्ट‍के‍जलए‍ऄलग-ऄलग‍्ास्ट्था‍करन‍े पर‍चचाव‍की‍गइ‍ू।, 14.2 नगरपाजलका‍के‍ठजु‍ऄपजिष्ट‍का‍स्ट्थानीय‍रूप‍ु‍ेप्रबधं न 14.2.1 नगरपाजलका‍के‍ठजु‍ऄपजिष्ट‍(एमएुडब्ल्यू) का‍प्रबंधन‍ुबं ंजधत‍स्ट्थानीय‍जनकायों‍द्वारा‍ऄपने-ऄपन‍े क्षेत्रों‍में‍दकया‍जाता‍ू।, ‍स्ट्थानीय‍जनकाय‍मास्ट्टर‍प्लान‍की‍जुफाररिों‍के‍ऄजतररि ‍एुडब्ल्यएू म-2016‍ ददिाजनदेिों‍(और‍ईुके‍बाद‍कजइ‍ुंिजधन)‍के‍प्रााधानों‍कज‍परू ी‍तरू‍ुे‍लाग‍ूकरेंगे। 14.2.2 जूां‍ऄपजिष्ट‍ईत्पन्न‍ूजता‍ू,, ाूााँ‍जनकटतम‍स्ट्थान‍पर‍ऄपजिष्ट‍का‍प्रबंधन‍करने‍के‍ऄनेक‍लाभ‍ूजत‍े ू,ैं ‍ज,ुेदक‍ स्रजत/आलाके‍में‍ूी‍ऄपजिष्ट‍की‍छाँटाइ‍पर‍बेूतर‍जनयंत्रण, स्ट्थानीय‍रूप‍ुे‍ुदक्रय‍ऄनौपचाररक‍ऄपजिष्ट‍94 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] कर्नमयों‍का‍बेूतर‍एकीकरण, स्ट्थानीय‍ुमुदायों‍और‍अरडब्ल्यूए, एमटीए‍अदद‍ुे‍जड़ु ना‍तथा‍पनु ःप्रयजग‍ एां‍पुननवाीकरण‍की‍चल‍ऄथ्व ास्ट्था‍कज‍ईत्प्रेररत‍करना। 14.2.3 'न्यनू तम‍ऄपजिष्ट‍क्षत्रे '‍(एमडब्ल्यएू ल)‍जनर्नमत‍करना i) ऐुे‍आलाके‍(अााुीय‍क्षेत्र, ूाईलुग‍ुजुायटी, कॉलजजनयां, ऄपाटवमेंट, बाजार, अदद)‍जूां‍ुभी‍ गीले‍एमएुडब्ल्यू‍कज‍पयावारण-ऄनुकूल‍ुमाधान‍ज,ुे‍कम्पजस्ट्ट‍खाद‍बनाकर, बायज-जमथेनेिन‍ अदद‍ऄपनाकर‍ईनकी‍चारदीाारी‍के‍भीतर‍प्रबंजधत‍दकया‍जाता‍ू,, ईन्ू‍ें न्यनू तम‍ऄपजिष्ट‍क्षत्रे ‍ (एमएुडब्ल्य)ू कूा‍जाएगा। ii) न्यूनतम‍ऄपजिष्ट‍क्षेत्र‍में‍ईत्पन्न‍पुननवाीकृत‍दकए‍जा‍ुकने‍‍ााले‍नगरपाजलका‍के‍ुूखे‍ठजु‍ ऄपजिष्ट‍कज‍ईु‍आलाके‍म‍ें ऄथाा‍ईु‍आलाके‍के‍जनकट‍जस्ट्थत‍म,टीररयल‍ररकारी‍ुुजाधा-केंद्र‍ (एमअरएफ)‍या‍प्रुंस्ट्करण‍ुंयंत्रों‍में‍भेजा‍जाएगा।‍नगरपाजलका-आतर‍ुमस्ट्त‍ऄपजिष्ट‍यानी‍इ- ऄपजिष्ट‍(जबजली, आलेक्रॉजनक्ु, ब,टरी ऄपजिष्ट),‍बायज-मेजडकल‍ऄपजिष्ट, खतरनाक‍ऄपजिष्ट‍ और‍जनमावण‍और‍ढ़ूाए‍गए‍जनमावण‍का‍(ुीएंडडी)‍ऄपजिष्ट‍अदद,‍ुरकारी‍प्राजधकृत‍प्रुंस्ट्करण‍ केंद्रों‍कज‍भेजा‍जाएगा।‍केाल‍ऄदक्रय‍ऄपजिष्ट,‍यदद‍कजइ‍ूज,‍केंद्रीकृत‍लैंडदफल‍स्ट्थलों‍पर‍ जनपटाया‍जाएगा। iii) लैंड‍पूललग,‍पनु रूद्धार‍यजजनाओं‍या‍ूररत‍जाकाु‍क्षेत्रों‍के‍भीतर‍अने‍ााले‍ुमस्ट्त‍नए‍जनमावण‍ कज‍न्यूनतम‍ऄपजिष्ट‍क्षेत्र‍(एमडब्ल्यूएल)‍के‍रूप‍म‍ें जाकजुत‍दकया‍जाएगा।‍(देख‍ें डीइाी1,‍ डीइाी2,‍डीइाी3) iv) ुभी‍स्ट्थानीय‍जनकाय‍अरडब्ल्यूए,‍एमटीए‍तथा स्ट्थानीय‍ऄनौपचाररक‍ऄपजिष्ट-कर्नमयों‍और‍ रांुपजटवरों‍अदद‍ुे‍जुड़कर‍ऄपने‍ऄजधकार‍क्षेत्र‍के‍तूत‍मौजूदा‍आलाकों‍कज‍न्यूनतम‍ऄपजिष्ट‍क्षेत्र‍ (एमडब्ल्यूएल)‍में‍रूपांतररत‍करने‍का‍काय‍वकरेंगे। 14.2.4 न्यूनतम‍ऄपजिष्ट‍क्षेत्र‍(एमडब्ल्यूएल)‍का‍जनमावण‍करन‍े के‍जलए‍जनम्नजलजखत‍कायवनीजतयां‍लाग‍ू की‍ जाएंगी: i) अरडब्ल्यूए/एमटीए‍और‍स्ट्थानीय‍ुमुदाय‍ुंबंजधत‍एजेंजुयों‍ुे‍परामि‍व करके‍गील‍े ऄपजिष्ट‍के‍ प्रुंस्ट्करण‍के‍जलए‍बड़े‍पाकों‍(जनकटाती‍पाकव‍और‍ऄनुक्रम‍ुे‍उपर)‍के‍कुछ‍जूस्ट्ुे‍कज‍खाद, ज,ा- मीथेन‍या‍पयावारण-ऄनुकूल‍दकुी‍नए‍ुमाधान‍के‍जलए‍ुमर्नपत‍कर‍ुकते‍ू।ैं ii) बड़ी‍मात्रा‍में‍ऄपजिष्ट‍प,दा‍करने‍ााली‍जािाल‍भू-ुम्पजियां‍(ूजटल, रेस्ट्तरा,ं मॉल, अदद)‍ु‍े प्राप्त‍गीला‍ऄपजिष्ट‍पररुर‍के‍भीतर‍ूी‍स्रजत‍पर‍ुंुाजधत‍और‍ऄलग‍दकया‍जाएगा‍दकया‍ जाएगा‍या‍ऄजधकृत‍खाद‍ुंयंत्रों‍में‍ल‍ेजाया‍जाएगा। iii) स्ट्थानीय‍जनकाय‍यू‍ुुजनजित‍करेंग‍े दक‍ऄजनयजजजत‍बजस्ट्तयों‍(जेज‍े क्लस्ट्टर‍ुजूत)‍में‍ऄपजिष्ट‍ कज‍ ईुके‍ ईत्पन्न‍ ूजने‍ के‍ स्ट्थल‍ के‍ जनकट एकजत्रत‍ और‍ प्रबंजधत‍ एां‍ िजजधत‍ दकया‍ जाए।‍ जनााजुयों/अरडब्ल्यूए‍के‍परामिव‍ु‍े ऄपजिष्ट‍के‍स्ट्थानीय‍िजधन‍के‍जलए‍स्ट्थलों‍की‍पूचान‍की‍ जाएगी। iv) दीघवकाजलक‍्ाूारगत‍पररातवन‍लान‍े के‍लक्ष्य‍कज‍ुाधन‍े और‍जागरूकता‍बढ़ान‍े के‍जलए, स्ट्थानीय‍जनकाय‍स्ट्थायी‍ऄपजिष्ट‍प्रबंधन‍की‍ऄच्छी‍प्रथाओं‍कज‍प्रजत्ुाजूत‍कर‍ुकते‍ू‍ैं और‍ग,र‍ ुरकारी‍ुंगठनों, ुीबीओ‍अदद‍के‍ुाथ‍ुूयजग‍कर‍ुकते‍ू।ैं 14.2.5 ऄपजिष्ट‍ुबं धं ी‍ऄाुरं चना‍कज‍नया‍रूप‍दने ाः‍स्ट्थानीय‍जनकाय‍एमएुडब्ल्यू‍की‍ऄजधकतम‍मात्रा‍का‍ प्रबंधन‍करने‍के‍जलए‍मौजूदा‍बुजनयादी‍ढांचे‍और‍ुंुाधनों‍का‍ुाोिम‍जाजध‍ुे‍ईपयजग‍करेंग।े[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 95 i) ढलाा‍जजनम‍ें पयावप्त‍जगू‍और‍क्षमता‍ू,, ाे‍स्ट्थानीय‍स्ट्तर‍पर‍म,टीररयल‍ररकारी‍फ,जुजलटीज‍ (एमअरएफ) के‍रूप‍में‍कायव‍करेंग े और‍ये‍ऄपजिष्ट‍की‍छंटनी‍और‍पनु नवाीकरण‍ााली‍ास्ट्तओंु ‍की‍ प्राजप्त‍के‍जलए‍स्ट्थान‍ईपलब्ध‍कराएंगे। ii) लैंड‍पूललग‍क्षेत्रों‍में,‍पथृ क‍म,टीररयल‍ररकारी‍फ,जुजलटीज‍(एमअरएफ)‍के‍जलए‍प्रााधान‍दकया‍ जाएगा। iii) स्ट्थानीय‍जनकायों‍या‍अरडब्ल्यूए‍द्वारा‍स्ट्थानीय‍कचरा‍बीनने‍ाालों‍और‍'कबाड़ी‍ााले' कज‍ एमडब्ल्यूएल‍जाकजुत‍करने‍और‍कागज, कांच, धातु‍और‍प्लाजस्ट्टक‍के‍जलए‍मौजूदा‍रीुाआलक्लग‍ नेटाकव‍का‍लाभ‍ईठान‍े के‍जलए‍लगाया‍जा‍ुकता‍ू।, iv) परराून‍दकए‍जा‍रू‍े कचरे‍की‍मात्रा‍म‍ें कमी‍के‍ुाथ, स्ट्थानीय‍जनकाय‍ऄन्य‍ईद्देश्यों‍के‍जलए‍ परराून‍ााूनों‍का‍ईपयजग‍बढ़ा‍ुकते‍ू।ैं 14.3 एमएुडब्ल्य‍ूके‍पयााव रणीय‍प्रभाा‍कज‍कम‍करना 14.3.1 एमएुडब्ल्य‍ूके‍पयावारणीय‍प्रभाा‍कज‍कम‍करने‍के‍जलए‍जनम्नजलजखत‍ईपाय‍‍दकए‍जाएगं ेः i) ऄपजिष्ट-जनपटान‍के‍जलए‍लडैं दफल‍पर‍ददल्ली‍की‍जनभवरता‍काफी‍कम‍की‍जाएगा।‍मौजूदा‍ लैंडदफल‍स्ट्थलों‍का‍जाकाु‍करके‍ूररत/मनजरंजन‍के‍क्षेत्रों‍के‍रूप‍में‍ऄजधकाजधक‍प्रयजग‍िुरू‍ दकया‍जाना‍ू।, ‍आन‍स्ट्थलों‍पर‍लेगुी‍ऄपजिष्ट‍कज‍लीगेुी‍ाेस्ट्ट‍के‍जनपटान‍के‍जलए‍ुीपीुीबी ददिाजनदेि‍2019 (पुराने‍एमएुडब्ल्य)ू के‍ऄनुुार‍चरणबद्ध‍तरीके‍ु‍ेबचाया‍जा‍ुकता‍ू।, ii) राष्ट्रीय‍ुंुाधन‍दक्षता‍नीजत‍(एनअरइपी)-2019‍द्वारा‍ऄनिु ंजुत‍प्रजत्ुाून/ूतजत्ुाून‍ददल्ली‍ के‍जलए‍ईपयि ु ‍रूप‍ुे‍ऄपनाया‍जाएगा। iii) ददल्ली‍म‍ें कजइ‍नया‍लडैं दफल‍स्ट्थल‍बनाने‍की‍ऄनुमजत‍नूीं‍दी‍जाएगी।‍पयावारण‍पर‍प्रभाा‍के‍ अकलन‍के‍अधार‍पर‍जनपटान‍के‍ुभी‍ऄनुमेय‍तंत्रों‍का‍पता‍लगाया‍जाएगा।‍कजइ‍भी‍नया‍ लैंडदफल‍(यदद‍प्रस्ट्ताजात‍ूज)‍ऄदक्रय‍ऄपजिष्ट‍के‍जनपटान‍के‍जलए‍ऄजनाायवतः‍स्ट्ाच्छ‍लडैं दफललग‍ तकनीकें‍ऄपनाएगा। iv) स्ट्थानीय‍जनकायों‍और‍जनजी‍एजेंजुयों‍कज‍भजाष्य‍में‍पयावारण‍के‍ऄनुकूल‍ऄपजिष्ट‍प्रुंस्ट्करण‍ तकनीकों‍का‍पता‍लगाने‍और‍ईन्ू‍ेंऄपनाने‍के‍जलए‍प्रजत्ुाजूत‍दकया‍जाता‍ू।, v) ुाावजजनक‍क्षेत्रों‍में‍कूड़ा-करकट‍और‍जल‍जनकायों, पाकों, ूररत‍क्षेत्रों‍और‍खलु ी‍भूजम‍में‍कूड़ा‍ फेंकना‍ुख्त‍ार्नजत‍ूजगा। 14.4 गर, -नगरपाजलका‍ऄपजिष्ट‍का‍प्रबधं न 14.4.1 नगरपाजलका-आतर‍ ऄपजिष्ट‍ जु, े‍ इ-ऄपजिष्ट‍ (जबजली, आलेक्रॉजनक्ु, ब,टरी‍ ऄपजिष्ट, अदद), बायज-मेजडकल‍ ऄपजिष्ट,‍खतरनाक‍ऄपजिष्ट‍तथा‍जनमावण‍और‍ढ़ूाए‍गए‍जनमावण‍के‍ऄपजिष्ट‍का‍प्रबंधन पयावारण, ान‍और‍ जलाायु‍पररातनव ‍मंत्रालय‍द्वारा‍ऄजधुूजचत‍जनयमों(2016)‍का‍कड़ाइ‍ु‍े ऄनुपालन‍करके‍दकया‍जाएगा।‍ आु‍तरू‍के‍ऄपजिष्ट‍के‍प्रुस्ट्ं करण‍के‍जलए‍ऄजतररि ‍ऄजधकृत‍ुजु ाधाओं‍की‍्ास्ट्था‍आु‍प्रकार‍की‍जाएगीः i) मेजडकल‍ऄपजिष्ट‍और‍ुामान्य‍बायज-मेजडकल‍ऄपजिष्ट‍की‍िजधन‍ुुजाधाएं‍(ुीबीडब्ल्यटू ीएफ) अाश्यकतानुुार‍प्रदान‍की‍जानी‍चाजूए। ii) अइटी/अइटीइएु‍और‍ऄन्य‍जडजजटल-ऄथव्ास्ट्थाओं, इ-ााूनों‍ज,ुी‍नइ‍प्रौद्यजजगदकयों‍के‍अन‍े ुे,‍इ-ऄपजिष्ट‍की‍मात्रा‍में‍ाृजद्ध‍ूजने‍की‍ुंभााना‍ू,, तदनुु ार‍जनपटान‍के‍जलए‍प्रााधान‍दकया‍ जाना‍ूजगा।‍96 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] iii) ऄजधकृत‍जनमाणव ‍और‍ढ़ूाए‍गए‍जनमावण‍(ुीएंडडी)‍ुंबंधी‍ऄपजिष्ट‍के‍प्रुंस्ट्करण‍ुंयंत्रों‍की‍क्षमता‍ में‍ाृजद्ध‍की‍जाएगी‍और‍जूा‍ाँ भी‍्ाूायव‍ूजगा,‍नए‍प्रुंस्ट्करण‍ुंयंत्रों‍की‍्ास्ट्था‍की‍जा‍ुकती‍ ू।, 14.5 ऄपजिष्ट‍का‍ुुं ाधन‍के‍रूप‍म‍ेंुाोिम‍ईपयजग 14.5.1 ऄपजिष्ट‍प्रबंधन‍म‍ें िाजमल‍ुभी‍एजेंजुयां‍कम‍करन,े पुन:‍ईपयजग‍और‍पुनचवक्रण‍(ुकुवलर‍‍ऄथव्ास्ट्था)‍ के‍जुद्धांतों‍कज‍ऄपनाएगं ी, कचरे‍कज‍एक‍ुंुाधन‍के‍रूप‍म‍ें मानें‍और‍ऄपजिष्ट‍ु‍े ुंबंजधत‍ईद्यजगों‍के‍ जाकाु‍के‍जलए‍एक‍ााताारण‍की‍ुुजाधा‍प्रदान‍करें। i) जनमावण‍और‍ढ़ूाए‍गए‍जनमाणव ‍(ुीएंडडी)‍ुंबंधी ऄपजिष्ट‍जनयम-2016‍के‍ऄनुुार‍ुीएंडडी‍ पुननवाीकृत‍ईत्पादों‍का‍ईपयजग‍ऄजनाायव‍दकया‍जाएगा।‍ुभी‍पुनर्नाकाु‍पररयजजनाओं‍के‍जलए‍ स्ट्थल‍ पर‍ ईत्पन्न‍ ुीएंडडी‍ ऄपजिष्ट‍ का‍ पुन:ईपयजग‍ और‍ ुभी‍ नइ‍ जाकाु‍ पररयजजनाओं‍ म‍ें पुननवाीकृत‍ुीएंडडी ईत्पादों‍का‍ईपयजग‍यथाुंभा‍ऄजनाायव‍दकया‍जाना‍ूजगा। ii) ज,जाक‍जाजध‍ुे‍ऄपघरटत‍ऄपजिष्ट‍की‍खाद‍बनान‍े के‍जलए‍ऄजधुूजचत‍ूररत‍जाकाु‍क्षेत्र‍(जीडीए)‍ में‍बड़े‍प,मान‍े पर‍खाद‍बनान‍े ााले‍फामों‍कज‍बढ़ााा‍ददया‍जाएगा।‍आु‍खाद‍का‍ईपयजग‍जीडीए‍के‍ भीतर‍या‍िूर‍के‍बाकी‍जूस्ट्ुों‍में‍जाजभन्न‍ूररत‍कायों‍के‍जलए‍दकया‍जा‍ुकता‍ू।, iii) ददल्ली‍और‍ईुके‍पड़जुी‍क्षेत्रों‍में‍‘ऄपजिष्ट‍ुे‍कमाइ’ (waste to wealth) के‍आकज-जुस्ट्टम‍कज‍ मजबूत‍करने‍के‍जलए‍गुणािा‍मानकों‍पर‍खरा‍ईतरने‍ााल‍े पनु नवाीकृत‍ऄपजिष्ट‍ईत्पादों‍और‍खाद‍ कज‍ुंबंजधत‍एजेंजुयों‍द्वारा‍बढ़ााा‍ददया‍जा‍ुकता‍ू।, --- x --- x ---- x --- x ---[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 97 15.0 जाद्यतु ,‍गु, ,‍दरू ुचं ार‍और‍जडजजटल‍‍‍ऄाुरं चना (आन्फ्रास्ट्रक्चर)‍का‍प्रााधान ऄ्याय कजड INF3 15.1.1 ददल्ली‍कज‍जाि‍स्ट्तरीय‍जडजजटल‍नेटाकव‍बुजनयादी‍ढांचे‍का‍जनमावण‍करन‍े और‍एक‍स्ट्थायी‍िूर‍बनन‍े और‍ऄपनी‍ ा,जिक‍प्रजतस्ट्पधा‍व कज‍बढ़ाने‍के‍जलए‍स्ट्ाच्छ‍उजाव‍म‍ें स्ट्थानांतररत‍करने‍की‍अाश्यकता‍ू।, ‍आु‍ुंबंध‍म‍ें जनम्नजलजखत‍पररकल्पना‍की‍गइ‍ू:, i) नाीकरणीय‍उजा‍वईत्पादन‍और‍ईपयजग‍बढ़ाना। ii) ुम्पूणव‍िूर‍में‍ुुदढ़ृ ‍और‍ऄनुकूलनीय‍जडजजटल‍आंफ्रास्ट्रक्चर‍और‍कन,जक्टजाटी। iii) जाद्युत‍और‍ग,ु‍के‍जलए‍बेूतर‍आन्फ्रास्ट्रक्चर। 15.2 नाीकरणीय‍उजा‍वका‍प्रयजग‍और‍जाद्यतु ‍का‍दक्षतापणू ‍वईपभजग 15.2.1 ग्लजबल‍ाार्ममग‍और‍जलाायु‍पररातवन‍कज‍देखते‍ुएए,‍जीााश्म‍ईंधन‍ज,ुे‍पारंपररक‍स्रजतों‍ुे‍ूटकर‍ स्ट्ाच्छ‍उजा‍वस्रजतों‍के‍प्रयजग‍कज‍ुक्षम‍बनान‍ेकी‍एक‍यजजना‍जाकजुत‍दकये‍जाने‍की‍अाश्यकता‍ू।, 15.2.2 ददल्ली‍के‍जलए‍नाीकरणीय‍उजाव‍की‍एक‍यजजना‍त,यार‍दकये‍जाने‍के‍जलए‍नाीन‍और‍नाीकरणीय‍उजा‍व मंत्रालय,‍भारत‍ुरकार‍द्वारा‍रेखांदकत‍लक्ष्यों‍कज‍पूरा‍करने‍के‍जलए‍कायवनीजतयों‍और‍पररयजजनाओं‍के‍ ुाथ-ुाथ,‍ददल्ली‍के‍ऄन्दर‍ुभं ाजात‍नाीकरणीय‍उजा‍वईत्पादन‍के‍क्षेत्रों‍का‍पता‍लगाएगा। 15.2.3 ददल्ली‍के‍पाु‍ुौर‍उजा‍व के‍ईत्पादन‍की‍ऄत्यजधक‍क्षमता‍ू,,‍आुजलए‍ददल्ली‍म‍ें ुौर‍उजाव‍के‍ईत्पादन‍म‍ें ाृजद्ध‍करने‍के‍जलए‍जनम्नजलजखत‍नीजतयों‍कज‍ऄपनाया‍जा‍ुकता‍ू:, i) ददल्ली‍के‍“कृजी‍और‍ुौर‍प्रजतष्ठान‍यजजना”‍के‍ऄनरुु प,‍‘ूररत‍जाकाु‍क्षेत्र’‍में‍ुौर‍फामव‍कज‍ प्रजत्ुाजूत‍दकया‍जाएगा।‍ऄपनी‍कृजी‍भूजमयों‍पर‍ुौर‍प्रजतष्ठान‍स्ट्थाजपत‍करन‍े ूते ‍ु भू-स्ट्ााजमयों‍ कज‍प्रजत्ुाजूत‍करने‍के‍जलए‍जाद्युत‍खरीद‍ऄनुबंध‍अधाररत‍मॉडल‍कज‍ऄपनाया‍जा‍ुकता‍ू।, ‍ (देखें:‍डीइाी2) ii) ददल्ली‍में‍कइ‍नूर‍ू‍ैं जजनका‍ईपयजग‍्ाूाररकता‍के‍ऄनुुार‍ुौर‍उजा‍व का‍दजून‍करने‍के‍ जलए‍दकया‍जा‍ुकता‍ू।, ‍नूर‍के‍स्ट्ााजमत्ा‍ााली‍एजेंजुयााँ‍ुौर‍उजाव‍के‍ईत्पादन‍के‍जलए‍आु‍ क्षमता‍का‍लाभ‍ईठा‍ुकते‍ू।ैं iii) ददल्ली‍ुौर‍नीजत‍2016‍और‍नेट‍मीटररग‍जाजनयम,‍2014‍‍के‍ऄनुुार, ुरकारी‍भानों‍और‍ ुंस्ट्थागत‍पररुरों‍जजनके‍छत‍का‍क्षेत्रफल‍500‍ाग‍व मी.‍ुे‍ऄजधक‍ूज,‍म‍ें ुौर‍पीाी’ज‍की‍ स्ट्थापना‍की‍जाए। iv) एयरपजटों,‍ मेरज‍ स्ट्टेिनों, रेलाे‍ स्ट्टेिनों, ऄंतर-राज्य‍ एां‍ िूरी‍ स्ट्तर‍ के‍ बु‍ ऄड्डों/जडपज, स्ट्टेजडयमों‍अदद‍ज,ुे‍बड़े‍स्ट्तर‍की‍ुाावजजनक‍ुुजाधाएाँ‍ुौर‍एां‍ऄन्य‍नाीकरणीय‍उजाव‍के‍ मा्यम‍ुे‍ऄपनी‍ऄजधकतर‍जाद्युत‍अाश्यकताओं‍कज‍ईिरजिर‍परू ा‍कर‍ुकते‍ू।ैं v) दकुी‍भी‍ऄजतररि ‍जबजली‍ईत्पादन‍कज‍(ुाआट‍पर‍अाश्यकताओं‍कज‍परू ा‍करन‍े के‍बाद)‍जग्रड‍ म‍ें फीड‍दकया‍‍जा‍ुकता‍ू,, 15.2.4 भानों‍और‍ुाावजजनक‍स्ट्थानों‍पर‍ुौर‍उजाव‍के‍ईपयजग‍म‍ें ाृजद्ध‍करन‍े के‍जलए‍जनम्नजलजखत‍कायनव ीजतयों‍ कज‍ऄपनाया‍जा‍ुकता‍ूः, i) ुड़कों,‍पाकों‍और‍ुाावजजनक‍स्ट्थानों‍के‍जलए‍ुौर‍अधाररत‍एलइडी‍प्रकाि‍्ास्ट्था‍का‍ ईपयजग‍दकया‍जाए।‍आनका‍कायावन्ान‍ुंबंजधत‍एजेंजुयों‍द्वारा‍ााक‍प्लान्ु‍और‍एमएमअइ‍ ज,ुी‍क्षेत्र‍ुुधार‍पररयजजनाओं‍के‍एक‍भाग‍के‍रूप‍म‍ेंदकया‍जाएगा। ii) ुभी‍प्लॉटों‍जजनके‍छत‍का‍क्षत्रे फल‍100‍मीटर‍ुे‍ऄजधक‍ूज, में‍ुौर‍पीाी‍की‍स्ट्थापना‍कज‍ प्रजत्ुाजूत‍दकया‍जाएगा‍और‍ुौर‍उजाव‍की‍ुूायता‍ुे‍पररचाजलत‍ूजने‍ााल‍े जल‍तापन‍98 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] प्रणाली‍कज‍यूबीबीएल‍के‍ऄनुुार‍प्रजत्ुाजूत‍दकया‍जाएगा।‍ुभी‍नए‍जनमावणों‍में‍आुकी‍ स्ट्थापना‍कज‍ऄजनाायव‍दकया‍जाए‍और‍भानों‍की‍ऄनुमजत‍देन‍ेके‍ुाथ‍आुे‍ललक‍दकया‍जाए। iii) जडस्ट्कॉम्ु‍ुभी‍नए‍जनमाणव ों‍म‍ें ऄजनाायव‍रूप‍ुे,‍तथा‍ुभी‍मौजूदा‍भानों‍में‍स्ट्माटव‍मीटर‍की‍ स्ट्थापना‍चरणबद्ध‍तरीके‍ु‍ेकरेगा। iv) डीइअरुी‍द्वारा‍पीक‍ुमय‍के‍दौरान‍ुौर‍उजाव‍के‍ुंार्नधत‍ईपयजग‍कज‍प्रजत्ुाजूत‍करन,े‍ जाद्युत‍के‍ऄजधकतम‍भार‍कज‍कम‍करने‍और‍प्रणाली‍की‍दक्षता‍कज‍ुुधारने‍के‍जलए‍जाद्युत‍ अपूर्नत‍के‍जभन्न-जभन्न‍मूल्य‍जनधावरण‍प्रणाली‍कज‍ऄपनाया‍जा‍ुकता‍ू।, 15.2.5 मॉड्यूलर‍स्ट्टार‍रेरटग‍ााले‍जाद्युतीय‍ईपकरणों‍और‍आलेजक्रकल‍दफक्स्ट्चरों‍कज‍ईच्च‍उजा‍व दक्षता‍के‍जलए‍ भानों‍म‍ें ऄजनाायव‍दकया‍जाए। 15.2.6 यूबीबीएल‍और‍उजाव‍ुंरक्षण‍भान‍ुंजूता‍2018‍के‍ऄनुुार,‍थमलव ी‍कम्फटेबल‍और‍उजाव‍ुक्षम‍भानों‍ कज‍प्रजत्ुाजूत‍दकया‍जाएगा।‍पररयजजनाओं‍की‍यजजना‍और‍रूपरेखा‍बनात‍े ुमय‍जनम्नजलजखत‍पर‍ जाचार‍दकया‍जाना‍चाजूएः i) जलाायु‍जाज्ञान,‍ाायु‍प्रााू,‍जल‍जनकाुी,‍जनकटाती‍जलािय‍की‍ईपजस्ट्थजत। ii) ुभी‍नए‍जाकाु‍कायों‍के‍जलए‍प्लॉटों‍के‍ऄतं गतव ‍ग्रीन‍ब्ल‍ू ग्रीन‍जािेीताओं‍का‍जाकाु‍(दखे ें:‍ इएनाी2)। iii) जाद्यमान‍भानों‍कज‍ईनके‍थमलव ‍कंफट‍व कज‍बढ़ान‍े के‍जलए‍पनु ःुंयजजजत‍दकया‍जा‍ुकता‍ू।, ‍ पुनःुंयजजन‍में‍िेलडग,‍ाेंरटलिे न,‍आंुलु ेिन‍अदद‍के‍प्रााधान‍कज‍ुजम्मजलत‍दकया‍जा‍ुकता‍ ू।, 15.2.7 ुभी‍ुंबंजधत‍एजेंजुयां‍पीक‍लजड‍जडमांड‍के‍प्रबधं न‍के‍जलए‍जनम्नजलजखत‍रणनीजत‍ऄपना‍ुकती‍ू:ैं i. ‍जमजश्रत‍ईपयजग‍कज‍बढ़ााा‍देना, ii. चुलनदा‍्ााुाजयक/मनजरंजन‍स्ट्थलों‍कज‍24‍घंटे‍काम‍करन‍े की‍ऄनुमजत‍द‍ें और‍रात‍की‍ऄथव्ास्ट्था‍ कज‍बढ़ााा‍द।ें iii. खेल‍और‍ऄन्य‍अयजजनों‍अदद‍की‍बड़ी‍ुाावजजनक‍स्ट्क्रीलनग‍की‍स्ट्थापना‍करना। iv. ुाझा‍ूीरटग‍और‍कूललग‍जुस्ट्टम‍की‍्ाूायवता‍की‍जांच‍करें v. राजत्र‍पार्ककग‍और‍इाी‍चार्मजग‍के‍जलए‍खाली‍कायावलय‍भान/स्ट्कूल‍अदद‍का‍ईपयजग‍करें। vi. पीक‍अाुव‍के‍दौरान‍इाी‍ब,टरी‍स्ट्ा,लपग‍कज‍बढ़ााा‍दें‍और‍केाल‍नॉन-पीक‍अाुव‍के‍दौरान‍इाी‍ चार्मजग‍की‍ऄनुमजत‍द।ें 15.2.8 ुौर‍प,नलों‍के‍पयावारणीय‍और‍अर्नथक‍लाभों‍कज‍बताते‍ुएए‍जनमावण‍ुमुदाय‍और‍ऄंजतम‍ईपयजगकताओंव ‍ कज‍ुंाेदनिील‍बनाने‍के‍जलए‍ुभी‍ुंबंजधत‍एजेंजुयां‍और‍जाभाग,‍जडस्ट्कॉम्ु,‍इइएडं अरइएम‍और‍ बीइइ‍जागरूकता‍ऄजभयान‍चलाए।ं 15.3 जडजजटल‍रूप‍ु‍ेुक्षम‍और‍कनजे क्टड‍िूर 15.3.1 ददल्ली‍के‍प्रभाािाली‍िूरी‍प्रबंधन‍के‍जलए‍5जी‍एा‍ं आुुे‍ईन्नत‍नेटाकव,‍ुम्पणू व‍िूर‍म‍ें फाआबर‍ जास्ट्तार‍और‍अइओटी‍(आंटरनटे ‍ऑफ‍लथग्ु)‍के‍ुाथ,‍िूरी‍जडजजटल‍प्रणाजलयों‍के‍एकीकरण,‍कृजत्रम‍ बौजद्धकता‍(एअइ),‍क्लाईड‍कंप्यूरटग‍और‍जबग‍डाटा‍अदद‍ज,ुे‍ईच्चतर‍ुेाा‍स्ट्तरों‍कज‍ुमथवन‍देन‍े के‍ जलए‍ददल्ली‍कज‍ुमुजचत‍बुजनयादी‍ुुजाधाओं‍की‍्ास्ट्था‍करने‍की‍अाश्यकता‍ू।,[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 99 15.3.2 जडजजटलीकरण‍के‍बढ़े‍ुएए‍स्ट्तर‍के‍ुाथ,‍डाटा‍ुंग्रूण,‍ुावर‍प्रबंधन‍अदद‍की‍अाश्यकता‍कज‍पूरा‍करन‍े के‍जलए‍डाटा‍केन्द्रों‍की‍स्ट्थापना‍की‍जा‍ुकती‍ू।, ‍ऐुे‍डाटा‍केन्द्रों‍कज‍मानदंडों‍के‍ऄनुुार,‍ुाावजजनक‍ और/या‍जनजी‍एजेंजुयों‍द्वारा‍जाकजुत‍दकया‍जा‍ुकता‍ू।, 15.3.3 स्ट्थानीय‍जनकायों‍द्वारा‍प्रभााी‍िूरी‍प्रबंधन, जािेी‍रूप‍ु‍े यातायात, ुुरक्षा, अपदा‍प्रजतदक्रया‍अदद‍ के‍जलए‍प्रमुख‍चालकों‍के‍रूप‍म‍ें जडजजटल‍रूप‍ु‍े एकीकृत‍कमांड‍और‍जनयंत्रण‍केंद्र‍स्ट्थाजपत‍दकए‍जा‍ ुकते‍ू।ैं 15.3.4 आन्टरनेट‍की‍गजत‍और‍ुेााओं‍की‍जािुनीयता‍के‍पररपेक्ष्य‍म,ें‍फाआबर-ऑजप्टक्ु‍के‍मा्यम‍ु‍े कनेजक्टजाटी‍कज‍ऄजधक‍ुक्षम‍माना‍जाता‍ू।, ‍एनडीुीपी‍2018‍का‍ “फाआबर‍प्रथम‍पूल”‍और‍ अरओडब्ल‍ू नीजत‍2016‍के‍जाजनयम,‍दरू ुंचार‍आन्फ्रास्ट्रक्चर‍के‍ुंाधवन‍कज‍ुुगम‍बनाएंग।े ‍ऑजप्टक‍ फाआबर‍का‍दक्रयान्ान‍राज्य‍ुरकार,‍स्ट्थानीय‍जनकायों‍और‍जनजी‍क्षेत्र‍कज‍ुजम्मजलत‍करते‍ुएए‍ुामूजूक‍ मॉडलों‍के‍मा्यम‍ुे‍ूजगा,‍ज,ुा‍दक‍ुाझा‍दकये‍गए‍दरू ुंचार‍आन्फ्रास्ट्रक्चर‍की‍्ास्ट्था‍के‍जलए‍ ऄपेजक्षत‍ू।, 15.3.5 ुीुीटीाी‍ क,मरों,‍ ाायु‍ प्रदीु ण‍ कज‍ जनयंजत्रत‍ करन‍े ााले‍ ुेंुरों,‍ दरू ुंचार‍ ऐन्टेना,‍ ााइ-फाइ‍ ूॉटस्ट्पॉट/माआक्रजुेल्ु,‍ ुौर‍ प्रकाि‍ ्ास्ट्था,‍ पजब्लक‍ एड्रेु‍ और‍ ुन्दिे ‍ भेजने‍ ााली‍ प्रणाजलयों,‍ अपातकालीन‍कॉल‍बॉक्ु‍अदद‍ुजूत,‍ुाावजजनक‍क्षेत्रों‍में‍स्ट्माटव‍पजल‍स्ट्थाजपत‍दकये‍जा‍ुकते‍ू‍ैं जजनका‍ुंयजजन‍िूरी‍एजेंजुयों‍की‍जडजजटल‍प्रणाजलयों‍के‍ुाथ‍दकया‍जा‍ुकता‍ू , 15.4 जाद्यतु ‍और‍गु, ‍अपर्नू त‍की‍ऄाुरं चना‍म‍ेंुधु ार‍लाना‍‍ 15.4.1 जाद्यतु ‍अधाररक‍ुरं चना: i) प्रस्ट्ताजात‍मास्ट्टर‍प्लान‍की‍ुड़कों‍के‍अरओडब्ल‍ू के‍ऄंतगतव ,‍मजे र‍रांुजमिन‍नेटाकव‍की‍यजजना‍ ्ाूाररकता‍के‍ऄनुुार‍बनायी‍जाएगी‍और‍ुीइए‍द्वारा‍जनधावररत‍मानदंडों‍के‍ऄनुुार,‍ ओारूड, ‍और‍ऄंडर‍ग्राउंड‍रांुजमिन‍लाआन्ु‍के‍ुरु क्षा‍मानदडं ों‍का‍ऄनुुरण‍दकया‍जाएगा।‍ ii) ददल्ली‍म‍ें ुभी‍नए‍ुब-स्ट्टेिनों‍कज‍्ाूाररकता‍के‍ऄनुुार‍ग,ु‍आंुुलेटेड‍ईप-केन्द्रों‍के‍रूप‍म‍ें जाकजुत‍दकया‍जाएगा,‍क्योंदक‍परंपरागत‍एयर‍आंुुलेटेड‍ईप-केन्द्रों‍की‍तलु ना‍म‍ें ऄनुमानतः‍ 50%‍कम‍भूजम‍क्षेत्र‍की‍अाश्यकता‍ूजती‍ू।, iii) ुभी‍नए‍11‍केाी‍जाद्युत‍् लाआनों‍कज‍तकनीकी‍और‍जािीय‍्ाूाररकता‍के‍ऄनुुार, लैंड‍पूललग‍ क्षेत्रों‍के‍रजड‍क्रॉु-ुेक्िनों‍के‍ऄंतगतव ,‍भूजमगत‍रूप‍ुे‍एकीकृत‍दकया‍जाए। 15.4.2 जडजजटल‍और‍दरू ुचं ार‍(आन्फ्रास्ट्रक्चर)‍ऄाुरं चनाः i) ऑजप्टक‍फाआबर‍एक‍ुाावजजनक‍ईपयजजगता‍ू‍, और‍आुके‍जलए‍्ाूाररकता‍के‍ऄनुुार‍12‍ मीटर‍मागावजधकार‍(अरओडब्लू)‍और‍ऄजधक‍के‍ुभी‍ुड़क‍ुेक्िनों‍में‍जगू‍ईपलब्ध‍कराइ‍ जाएगी। जूााँ‍भी‍ुंभा‍ूज,‍12‍मीटर‍ुे‍कम‍की‍ुड़कों‍पर‍ऑजप्टक‍फाआबर‍के‍तार‍ुड़क‍ ुेक्िन‍के‍ऄन्दर‍जबछाया‍जाएगा‍या‍मौजूदा‍जस्ट्थजतयों‍के‍ऄनुु ार‍पुनःुंयजजजत‍दकया‍जाएगा।‍ ii) ुभी‍नए‍भानों‍एां‍जाकाु‍कायों‍म‍ें दरू ुंचार‍ुंस्ट्थापनों‍और‍एिजजुएरटड‍ऄतं र-जनमावण‍ ुमाधानों‍कज‍बढ़ााा‍ददया‍जाए। 15.4.3 गु, ‍ऄाुरं चनाः100 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] i) भजाष्य‍म‍ें ग,ु‍पाआपलाआनों‍कज‍12‍मीटर‍और‍ऄजधक‍के‍मागावजधकार‍(अरओडब्लू)‍के‍ऄंतगवत‍ एकीकृत‍दकया‍जाएगा। ii) घरेलू‍स्ट्तर‍पर‍पाआप्ड‍ग,ु‍कनक्े िनों‍की‍्ास्ट्था‍कज‍ुभी‍नए‍भानों‍और‍जाकाु‍कायों‍के‍जलए‍ बढ़ााा‍ददया‍जाए। --- x --- x ---- x --- x --- ऄ्याय कजड 16.0 अपदा‍की‍तय, ारी‍एा‍ंप्रजतरजधकता INF4 16.1.1 ‍ददल्ली‍कज‍एक‍ऐुी‍प्रजतरजधक‍प्रणाली‍का‍जाकाु‍करने‍की‍जरूरत‍ू,, जज‍ऄप्रत्याजित‍अपदाओं,‍झटके,‍क्रॉजनक‍ स्ट्रेु‍की‍घटनाओं‍कज‍ुू‍ुके,‍कारवााइ‍कर‍ुके,‍ऄनुकूल‍ूज‍ुके‍और‍ठीक‍ूज‍ुके।‍दकुी‍भी‍ऄन्य‍मगे ािूर‍की‍ तरू, ददल्ली‍भी‍जाजभन्न‍प्रकार‍के‍जजजखमों‍का‍ुामना‍करती‍ू,, ज,ुे‍दक‍जलाायु‍पररातवन‍प्रभाा, भूकंप, अग, बाढ़, बीमारी‍के‍प्रकजप, मूामारी‍और‍ऄन्य‍खतरे। 16.1.2 ‍ददल्ली‍म‍ें आु‍तरू‍के‍जजजखमों‍का‍प्रभाा‍तब‍कइ‍गनु ा‍बढ़‍जाता‍ू,, जब‍ईन्ू‍ें अंतररक‍ुमस्ट्याओं‍ु‍े जुड़‍जात‍े ू,, ज,ुे‍दक‍बड़ी‍ुंख्या‍में‍घनी‍ऄजनयजजजत‍क्षत्रे ‍अबादी‍जजुमें‍कमजजर‍या‍खराब‍भानों‍के‍स्ट्टॉक‍ूजत‍े ू‍ैं और‍ ाे‍ऄजधक‍ुघन‍ूजत‍े ू।ैं ‍यू‍ददल्ली‍के‍एक‍बड़े‍जूस्ट्ु‍े कज‍अपदाओं‍के‍जलए‍ऄत्यजधक‍ुंाेदनिील‍बनाता‍ू,, क्योंदक‍आन‍क्षेत्रों‍म‍ेंदकुी‍भी‍घटना‍के‍ुमय, जान‍और‍माल‍के‍बड़े‍नुकुान‍की‍ुंभााना‍ूजती‍ू।, 16.1.3 ‍यू‍यजजना‍अपदा‍िमन‍और‍त,याररयों‍पर‍राज्य‍और‍राष्ट्रीय‍जाजनयमों‍के‍ऄनुरूप‍ू‍, और‍जजजखम‍कज‍कम‍करन‍े और‍ुंाेदनिीलता‍कज‍कम‍करन‍े के‍ुंदभ‍व म‍ें तीन-अयामी‍दजृ ष्टकजण‍ऄपनाती‍ूः, ‍यू‍प्रभाा‍कज‍कम‍करन,े ुाथ‍ूी‍प्रजतरजधक‍बुजनयादी‍ढांचे‍तथा‍प्रणाजलयों‍का‍ऄत्याधुजनक‍जनमावण‍करके‍अपदाओं‍पर‍कारवााइ‍करन‍े के‍जलए, और‍नागररकों‍कज‍जागरूक‍करके‍त,यार‍की‍जा‍रूी‍ू।, ‍ददल्ली‍जनम्नजलजखत‍के‍जलए‍प्रयाु‍करके‍ भजाष्य‍के‍जलए‍त,यार‍और‍प्रजतरजधक‍बनगे ीः i) प्राकृजतक‍अपदाओं‍के‍जलए‍बढ़ी‍ुएइ‍प्रजतरजधक‍क्षमता-‍खाुकर‍भूकंप‍के‍प्रजत। ii) अग‍और‍िूरी‍बाढ़‍की‍गंभीरता‍कज‍कम‍करना। iii) ुभी‍प्रकार‍की‍अपदाओं‍और‍जजजखमों‍के‍ुंबंध‍में‍कारवााइ‍करने‍की‍बेूतर‍क्षमता। 16.2 प्राकृजतक‍अपदाओं‍ूते ‍ुप्रजतरजधक‍क्षमता‍का‍जनमाणव ‍और‍तय, ारी‍ 16.2.1 भकू ंपीय‍गभं ीरता‍कज‍कम‍करनाः‍ददल्ली‍राष्ट्रीय‍भूकंपीय‍क्षत्रे ‍IV‍और‍V‍में‍जस्ट्थत‍ू,, जजुमें‍भूकंप‍ ‘‘ऄत्यजधक‍क्षजत’’ प,दा‍कर‍ुकते‍ू।, ‍यू‍िूर‍दज‍फॉल्ट‍लाआन्ु, ऄथावत‍मथरु ा‍और‍ददल्ली-मुरादाबाद‍ पर‍ऄाजस्ट्थत‍ू।, ‍ददल्ली‍अपदा‍प्रबंधन‍प्राजधककायव‍(डीडीएमए)‍न‍े ददल्ली‍ूते ु‍भूकंपीय‍माआक्रज- जजनीककायव‍यजजना‍त,यार‍की‍ू,, और‍एक‍ईच्च, म्यम‍और‍कम‍जजजखम‍ााले‍क्षेत्रों‍की‍पूचान‍की‍ू।, ‍ गंभीरता‍ कज‍ कम‍ करने‍और‍ भूकंप‍ ुे‍ ूजने‍ ााले‍ जान-माल‍ के‍ नुकुान‍ कज‍ कम‍ करने‍ के‍ जलए‍ जनम्नजलजखत‍कायवनीजतयों‍कज‍ऄपनाया‍जा‍ुकता‍ूः, i) िूर‍भर‍में‍ुमर्नपत‍ुंरचनात्मक‍लेखापरीक्षा‍की‍जाए, और‍ददल्ली‍में‍ुभी‍भानों‍कज‍ डीडीएमए‍और‍ुंबंजधत‍स्ट्थानीय‍जनकायों‍द्वारा‍स्ट्थाजपत‍ुमर्नपत‍प्रजटजकॉल/लों‍के‍ऄनुुार‍आु‍ लेखापरीक्षा‍ुे‍गुजरना‍ूजगा। ii) ुंरचनात्मक/ुुरक्षा‍लेखापरीक्षा, ज,ुा‍दक‍भारत‍ुरकार‍द्वारा‍जनधावररत‍ू,, कज‍ईच्च‍जजजखम‍ ााले‍जजनों, ुंाेदनिील‍लजकेजलटी, ऄत्यजधक‍अाा-जाूी‍ााले‍ुाावजजनक‍भानों, ररस्ट्पोंु‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 101 यूजनट‍ााले‍भानों‍(ऄजग्न‍िमन, पुजलु, ुमेदकत‍जनयंत्रण‍केन्द्रों‍आत्यादद), और‍अाश्यक‍ अधाररक‍ुंरचनाओं‍में‍प्राथजमकता‍दी‍जाए। iii) ुुरक्षा‍लेखापरीक्षा‍प्रजटजकॉल‍ में‍प्रदक्रया‍का‍जााकायव‍और लेखापरीक्षा‍के‍जलए‍मापदडं , लेखापरीक्षा‍की‍अाृजि, और‍भानों‍कज‍मजबूत‍करन‍े और‍पनु ःुंयजजन‍के‍जलए‍जानकारी‍दी‍ जाएगी। iv) भानों‍ और‍ ऄाुंरचना‍ के‍ मामले‍ म,ें जजुके‍ जलए‍ लेखापरीक्षा‍ द्वारा‍ ुुदढ़ृ ीककायव‍ और‍ पुनःुंयजजन‍की‍जुफाररि‍की‍गइ‍ू,, ईनमें‍ऄनुपालन‍ुुजनजित‍दकया‍जाएगा। v) यूबीबीएल‍के‍ऄनुुार,‍ुभी‍नए‍भानों‍और‍ुंरचनाओं‍की‍ुंरचनात्मक‍जडजाआन‍म‍ें भूकंपीय‍ ऄनुरूप‍भानों‍ूते ‍ु ददिाजनदेिों‍का‍पालन‍दकया‍जाएगा। vi) बेु‍अआुजलेिन, ूाआड्रजजलक‍ड,म्पेनु‍व और‍ऄन्य‍ऐुी‍ुंरचनात्मक‍जाजिष्टताओं‍कज‍ुंबंजधत‍ एजेंजुयों‍द्वारा‍ऄपनाया‍जा‍ुकता‍ू,, जजुुे‍परराून, जल,‍ईंधन अदद‍ुंबंधी‍मूत्ापणू व‍ बुजनयादी‍ढााँचे, भूकंपीय‍रूप‍ु‍ेप्रजतरजधक‍ुंरचना‍बन‍ुकें। vii) ुंबंजधत‍एजेंजुयां‍ऐुे‍क्षेत्रों/ऄाजस्ट्थजतयों‍की‍पूचान‍कर‍ुकती‍ू‍ैं जज‍प्राकृजतक‍अपदा‍की‍ जस्ट्थजत‍में‍ऄत्यजधक‍नुकुान‍के‍खतरे‍मे‍ू।ैं ‍ऐुे‍क्षेत्रों‍में‍जनााजुयों‍की‍ुुरक्षा‍ुुजनजित‍करने‍के‍ जलए‍ऄजनाायव‍पुनःुंयजजन‍ऄथाा‍पनु र्नाकाु‍करन‍े की‍ुुजाधा‍प्रदान‍की‍जा‍ुकती‍ू,।‍ईच्च‍ जजजखम‍ ााले‍ क्षेत्रों‍ में‍ प्रस्ट्ताजात‍ पुनरूद्धार‍ यजजनाओं‍ कज‍ ुंबंजधत‍ एजेंजुयों‍ द्वारा‍ ऄन्य‍ पररयजजनाओं‍की‍तुलना‍म‍ें प्राथजमकता‍दी‍जा‍ुकती‍ू।, 16.3 ऄन्य‍अपदाओं‍ु‍ेजजजखम‍कम‍करना 16.3.1 अग‍लगन‍े के‍जजजखम‍म‍ें कमीः‍औद्यजजगक, ्ााुाजयक‍आकाआयों‍और‍घनी‍अबादी‍ााली‍बजस्ट्तयों‍म,ें‍ घर‍म‍ेंअग‍लगन‍े की‍ुंभाानाए‍ं ऄजधक‍ूजती‍ू।ैं ‍िूर‍म‍ेंअग‍लगन‍े के‍जजजखमों‍कज‍कम‍करने‍के‍जलएः i) ऐुे‍ुभी‍भानज‍कज‍जूा‍ं ऄत्यजधक‍ज्ालनिील‍ुामग्री‍ााले‍काय‍व ूजते‍ू,ैं ाूां‍ऄजग्निमन‍ जाभाग‍ुे‍ऄजनाायव‍मंजूरी‍प्राप्त‍की‍जानी‍चाजूए, और‍ुुरक्षा‍ुााधाजनयां‍बरती‍जानी‍ चाजूए।‍आु‍प्रकार‍के‍ईपयजगों‍कज‍अााुीय‍या‍पीएुपी‍कायों‍के‍ुाथ‍जमलाने‍की‍ऄनुमजत‍ नूीं‍दी‍जाएगी। ii) जबजली‍के‍ााूनों‍कज‍बढ़ााा‍देने‍के‍जलए‍जीएनुीटीडी‍द्वारा‍ददल्ली‍आलेजक्रक‍ााून‍नीजत‍ 2020‍कज‍इाी‍ब,टरी‍के‍भडं ाकायव, चार्मजग, ईपयजग‍और‍जनपटान‍के‍बारे‍म‍ें स्ट्पष्ट‍ददिाजनदिे ों‍ के‍ुाथ‍और‍ऄजधक‍मजबूत‍दकए‍जाने‍जरूरत‍ू,, क्योंदक‍आनु‍े अग‍लगन‍े के‍ुंभाजात‍खतरे‍ू।ैं iii) जजन‍स्ट्थानों‍म‍ें फायर‍टेंडर‍नूीं‍पुएचं ‍ुकत‍े ू,ैं ईन‍स्ट्थानों‍में‍ददल्ली‍फायर‍ुर्नाुेज,‍मजबाआल‍ फायर‍ूाआड्रेंट‍और‍ऄन्य‍ऄत्याधुजनक‍ऄजग्निमन‍जगयर‍के‍ईपयजग‍कज‍ऄपना‍ुकती‍ू।ैं iv) डीडीएमए‍और‍ुंबंजधत‍एजेंजुयों‍द्वारा‍'अग‍के‍जलए‍ुंाेदनिील' के‍रूप‍म‍ें पूचान‍की‍गइ‍ आमारतों‍कज‍यूबीबीएल‍और‍ददल्ली‍ऄजग्निमन‍ुेााओं‍के‍मानदंडों‍के‍ऄनुुार‍अग‍की‍रजकथाम‍ और‍िमन‍ईपायों‍के‍ुाथ‍दफर‍ु‍े लगाया‍जाएगा। v) जाद्युत‍जाभाग, स्ट्थानीय‍जनकाय‍और‍ऄन्य‍ुंबंजधत‍एजेंजुयां, भानों‍म‍ें जाद्युत‍दजीों‍ु‍े ुुरक्षा‍ ुुजनजित‍करत‍े ुएए, जचजन्ूत‍ुंाेदनिील‍क्षेत्रों‍म‍ें चरणबद्ध‍तरीके‍ु‍े जाद्यतु ‍ुुरक्षा‍ुुजनजित‍ करने‍के‍जलए‍ुंयि ु ‍कारवााइ‍करेंगी।‍जािेी‍रूप‍ु‍े चारदीाारी‍ााल‍े िूर, िूरी‍गांाों‍और‍ ऄन्य‍घने‍क्षेत्रों‍म‍ें गजलयों‍म‍ें खलु े‍तारों‍और‍केबलों‍की‍देखभाल‍करके‍क्षत्रे ‍स्ट्तर‍की‍ऄजग्न‍ुुरक्षा‍ ुुजनजित‍की‍जाएगी।102 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 16.3.2 िूरी‍बाढ़‍और‍जलभराा‍की‍घटनाओं‍म‍ें कमीः‍तेजी‍ुे‍िूरीककायव‍के‍काकायव, ददल्ली‍में‍िूरी‍बाढ़‍ और‍जलभराा‍की‍अाृजि‍और‍तीव्रता‍लगातार‍बढ़‍रूी‍ू।, ‍जलााय‍ु पररातवन‍के‍प्रभााों‍के‍कारण‍यू‍ और‍खराब‍ूजने‍की‍ुंभााना‍ू।, ‍ूररत-अाकायव‍और‍जल‍के‍प्रजत‍ुंाेदनिील‍िूरी‍जाकाु‍कज‍बढ़ान‍े के‍जलए‍कायवनीजतयां‍ऄपनाइ‍जाएंगी।‍आुके‍ऄजतररि , जनम्नजलजखत‍कायवनीजतयां‍ऄपनाइ‍जाएगं ीः i) नालों‍ की‍ गाद‍ जनकालने‍ और‍ गाद‍ के‍ जनयजमत‍ जनपटान‍ के‍ ुाथ‍ ुभी‍ प्राकृजतक‍ और‍ मानाजनर्नमत‍नालों‍कज‍ऄारजधों‍और‍ऄजतक्रमणों‍ुे‍मि ु ‍रखा‍जाएगा। ii) स्ट्थानीय‍जनकाय‍अइएडं एफुी‍जाभाग‍के‍ड्रेनेज‍मास्ट्टर‍प्लान‍म‍ें यथा‍जनधावररत, बाढ़‍प्राण‍ क्षेत्रों‍में‍कुछ‍पाकव‍और‍ईद्यानों‍कज‍जचजननत‍कर‍ुकत‍े ूैं, जजनका‍ईपयजग‍बाढ़‍जनरजध‍लुक‍के‍ रूप‍म‍ेंदकया‍जा‍ुकता‍ू।, iii) यमुना‍बाढ़‍के‍म,दान‍म‍ें बड़े‍प,माने‍पर‍बरुात‍के‍पानी‍कज‍रजकने‍की‍पररयजजनाओं‍कज‍ुंबंजधत‍ एजेंजुयों‍द्वारा‍बाढ़‍जनयंत्रण‍और‍अपूर्नत‍बढ़ाने‍के‍जलए‍ताजे‍पानी‍का‍ुंग्रू‍करने‍‍के‍दजूरे‍ ईद्देश्य‍के‍ुाथ‍िरूु ‍दकया‍जाएगा।‍ऐुी‍पररयजजनाएं‍कड़े‍‍पयावारण‍ऄनुपालन‍ुुजनजित‍ करेंगी‍और‍नदी‍कज‍कजइ‍नुकुान‍नूीं‍पुएचं ाएंगी। 16.3.3 ाज, िक‍मूामाररयों‍के‍जजजखम‍कज‍कम‍करनाः i) प्लॉटों‍के‍भीतर‍जमजश्रत‍ईपयजग‍के‍जाकाु‍और‍ुंगत‍ईपयजगों‍की‍ार्टटकल‍जमलक्ुग‍कज‍िूर‍ में‍बढ़ााा‍ददया‍जाएगा, जजुमें‍ुभी‍ुेााओं, कायव‍केंद्रों‍और‍घरों‍की‍ईपलब्धता‍की‍ुुजाधा‍ ूजगी‍जज‍एक-दुू रे‍के‍अुपाु‍ू।ैं आन्ू‍ें अाश्यकता‍के‍ऄनुुार‍अत्मजनभरव ‍अआुजलेिन‍जजन‍ के‍रूप‍में‍ईपयजग‍दकया‍जा‍ुकेगा। ii) जाकेंद्रीकृत‍ कायवक्षेत्रों‍ कज‍ ुू-कायव‍ स्ट्थलों, झुग्गी‍ पुनाावु‍ पररयजजनाओं‍ के‍ भीतर‍ ुाझा‍ कायवक्षेत्रों‍और‍घर-अधाररत‍कायों‍के‍जलए‍ुमथवन‍अदद‍के‍रूप‍में‍बढ़ााा‍ददया‍जाएगा।आुके‍ ऄजतररि ‍अम‍ुामुदाजयक‍स्ट्थानों‍कज‍भी‍बढ़ााा‍ददया‍जाएगा‍तादक‍अपात‍जस्ट्थजत‍के‍ुमय‍ िरण‍स्ट्थल, ुझा‍रुजइ, क्वारंटाआन‍स्ट्थान‍अदद‍ईपलब्ध‍कराने‍के‍जलए‍ईपयजग‍दकया‍जा‍ुके। iii) बड़े‍ूररत‍क्षेत्रों‍का‍जाकाु, खुले‍क्षेत्रों‍का‍ऄजनाायव‍जनमावण, नए‍जाकाु‍क्षेत्रों‍में‍ुाावजजनक‍ स्ट्थल‍तथा‍प्लाजा, और‍जनयजजजत‍पुनरूद्धार‍के‍मा्यम‍ुे‍जनर्नमत‍ुघनता‍कज‍कम‍करना‍जु, ‍े कायव, ऐुी‍ा,जिक‍मूामाररयों‍के‍दौरान‍ुामाजजक‍दरू ी‍की‍अाश्यकताओं‍कज‍ुपजट‍व करेंग,े ुाथ‍ूी‍ुामान्य‍ुमय‍के‍दौरान‍ाे‍एक‍ुदक्रय‍ुाावजजनक‍स्ट्थान‍भी‍ूोंगे। iv) अााु‍आकाआयों‍के‍भीतर‍भीड़‍कज‍कम‍करन‍े और‍िूर‍म‍ें प्रााुी‍के‍जलए‍अााु‍की‍ुुजाधा‍ देने‍के‍जलए, गरीबों‍के‍जलए‍पयावप्त‍दकफायती‍दकराय‍े या‍स्ट्ााजमत्ा‍ााले‍अााु, श्रजमकों‍के‍ अााु, मजूलाओं‍और‍परुु ीों‍के‍जलए‍ूजस्ट्टल अदद‍जाकल्पों‍के‍जाकाु‍कज‍बढ़ााा‍ददया‍ जाएगा। v) यू‍यजजना‍बुए-ुुजाधा‍प्लॉटों‍(जािेी‍रूप‍ुे‍घनी‍अबादी‍ााले‍ऄजनयजजजत‍क्षेत्रों‍में)‍के‍ जनमावण‍की‍ुुजाधा‍प्रदान‍करती‍ू‍, जजनका‍ईपयजग‍ऄस्ट्थायी‍रूप‍ुे‍दकया‍जा‍ुकता‍ू,, और‍ अपदा‍के‍ुमय‍भी‍ऄन्य‍ुरकारी‍ुुजाधाओं‍के‍ुाथ-ुाथ‍आनका‍ईपयजग‍दकया‍जा‍ुकता‍ू।, vi) बेूतर‍अााु‍जडजाआन‍और‍ूररत-श्रेणीकृत‍जाकाु‍कज‍बढ़ााा‍ददया‍जाएगा, तादक‍म,केजनकल‍ ाेंरटलेिन‍जुस्ट्टम‍पर‍जनभवरता‍कम‍ूज‍ुके, जज‍ााय-ु जजनत‍मूामाररयों‍के‍दौरान‍खतरा‍ ईत्पन्न‍करत‍े ू।ैं 16.4 अपदाओं‍और‍जजजखमों‍के‍प्रजत‍प्रभााी‍कारवााइ‍का‍प्रबधं न[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 103 16.4.1 दकुी‍अपदा‍या‍ऄप्रत्याजित‍घटना‍के‍ुमय‍प्रभााी‍कारवााइ‍करने‍के‍जलए‍डीडीएमए‍एक‍ऄत्याधुजनक‍ अइुीटी‍ुक्षम‍ददल्ली‍जडजास्ट्टर‍ररस्ट्पॉन्ु‍फजुव‍(डीडीअरएफ)‍की‍स्ट्थापना‍कर‍ुकता‍ू।, ‍आु‍फजुव‍ कज‍ुरकारी‍जाभागों‍और‍एजेंजुयों‍के‍ुाथ-ुाथ‍ऄस्ट्पतालों, ुीएुओ‍अदद‍द्वारा‍ुूायता‍प्रदान‍की‍ जा‍ुकती‍ू।, ‍यू‍फजुव‍जनयजमत‍रूप‍ुे‍जजजखम‍मूल्यांकन‍काय‍व करेगा, प्रारंजभक‍चेताानी‍ुंकेतों‍कज‍ प्राप्त‍और‍रांुजमट‍करेगा, घटना‍के‍ुमय‍पालन‍दकए‍जाने‍ााले‍ुभी‍अाश्यक‍प्रजटजकॉल‍ऄजभुररत‍ करेगा‍और‍ुभी‍प्रजतदक्रया‍प्रणाजलयों‍कज‍ुदक्रय‍करेगा। i) जाजभन्न‍प्रकार‍की‍अपदाओं‍के‍जलए‍ऄपनाइ‍जान‍े ााली‍प्रदक्रया‍कज‍रेखांदकत‍करत‍े ुएए, ददल्ली‍ के‍जलए‍एक‍अपदा‍प्रजतदक्रया‍प्रजटजकॉल‍जाकजुत‍दकया‍जाएगा। ii) ुभी‍ुेााप्रदाता‍एजेंजुयां‍अपातकालीन‍प्रजतदक्रया‍यजजनाए‍ं और‍ददिाजनदेि‍त,यार‍करेंगी, तादक‍यू‍ुुजनजित‍दकया‍जा‍ुके‍दक‍अपदा‍के‍दौरान‍आन‍अाश्यक‍ुेााओं‍के‍जातकायव‍पर‍ कम‍ुे‍कम‍प्रभाा‍पड़े। iii) ुभी‍आलाकों‍म‍ें जनााजुयों‍के‍जलए‍जाजिष्ट‍जनकाुी‍स्ट्थान‍और‍िकाय‍व स्ट्थल‍तय‍दकए‍जाएंगे, जािेी‍तौर‍पर‍घनी‍अबादी‍ााले‍क्षेत्रों‍में। क) जनकाुी‍स्ट्थान‍खुल‍े अकाि‍ााल‍े क्षेत्र‍ूोंगे, जूााँ‍लजग‍दकुी‍घटना‍के‍ुमय‍आकट्ठा‍ूज‍ ुकते‍ू,ैं ज,ुे‍दक‍अग, भूकंप‍अदद।‍ये‍स्ट्थान‍पाकव, बुएईद्देश्यीय‍म,दान, ऄन्य‍खुले‍स्ट्थान‍ अदद‍ूज‍ुकत‍े ू।ैं ख) अरडब्लयूए/स्ट्थानीय‍जनकायों‍द्वारा‍जचजन्ूत‍कजइ‍भी‍अंतररक‍स्ट्थान‍िकायव‍स्ट्थल‍ूज‍ ुकते‍ू‍ैं जूां‍ुंक्रामक‍बीमाररयों‍के‍प्रकजप‍के‍दौरान‍ऄस्ट्ास्ट्थ/बीमार‍जनााजुयों‍कज‍ ा,कजल्पक‍रून‍े के‍स्ट्थान‍प्रदान‍दकए‍जा‍ुकें।‍ऐुे‍स्ट्थान‍ुाावजजनक‍ुुजाधा‍के‍तौर‍पर‍ ुुलभ‍ूजने‍चाजूए। iv) डीडीएमए‍एक‍अपदा-ईपरान्त‍पुनाावु‍कायवनीजत‍भी‍जाकजुत‍करेगा।‍जीएनुीटीडी‍के‍ुभी‍ जाभाग, स्ट्थानीय‍जनकाय‍और‍डीडीए‍ददल्ली‍के‍अपदा‍जजजृखम‍के‍जनयजमत‍मल्ू यांकन‍ूते ‍ु एक‍ प्रणाली‍जाकजुत‍करेंगे। --- x --- x ---- x --- x --- ाॉल्यमू ‍2 स्ट्थाजनक‍जाकाु‍ और‍ यजजना‍जनगरानी ूते ‍ुफ्रेमाकव खडं ‍7104 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] स्ट्थाजनक‍जाकाु‍ फ्रेमाकव ऄ्याय कजड 17.0 लडैं ‍पलू लग‍के‍मा्यम‍ु‍ेनए‍क्षत्रे ों‍का‍जाकाु DEV1 17.1.1 लैंड‍पूललग‍ददल्ली‍के‍िूरी‍जाकाु‍ूते ु‍एक‍नया‍प्रजतमान‍ू,, जजुम‍ें जनजी‍क्षेत्र‍भूजम‍ुंग्रूण‍और‍भौजतक‍तथा‍ ुामाजजक‍ऄाुंरचना‍के‍जाकाु‍में‍ुदक्रय‍भूजमका‍ऄदा‍करेगा।‍भूजम‍स्ट्ाामी‍ऄथाा‍भू-स्ट्ााजमयों‍के‍ुमूू ‍ जनधावररत‍मानदंडों‍और‍ददिाजनदेिों‍के‍ऄनुुार‍जाकाु‍ूते ‍ु भूखण्डों‍कज‍पलू ‍करेंगे, जजुुे‍ाे‍ऄपन‍े अपकज‍ जाकाु‍प्रदक्रया‍में‍भागीदार‍बनाएंगे।‍दकुी‍क्षेत्र‍के‍ुमेदकत‍जनयजजन‍के‍जलए‍ुड़कों, ईपयजजगताओं, ूररत‍क्षेत्रों‍ और‍ऄन्य‍अधाररक‍ुंरचना‍के‍जाकाु‍ूते ु‍ऄपेजक्षत‍भूजम‍ऄनमु जददत/ऄजधुूजचत‍यजजना‍के‍ऄनुुार‍जाकाु‍ूते ु‍ दद.जा.प्रा.‍और‍ुेाा‍प्रदाता‍एजेंजुयों‍कज‍ईपलब्ध‍कराइ‍जाएगी।‍यू‍ऄपेक्षा‍की‍जा‍रूी‍ू‍, दक‍ये‍क्षत्रे ‍ जािस्ट्तरीय,‍'स्ट्माट'व और‍स्ट्थायी‍नेबरुएड‍ुेक्टर‍और‍जजन‍ूोंगे‍जजनकज‍जल, उजाव‍और‍ऄन्य‍ऄाुंरचना‍की‍ ईपलब्धता‍के‍ऄनुुार‍जनयजजजत‍और‍जनष्पाददत‍दकया‍जाएगा। 17.1.2 ‍आु‍ुंबंध‍म‍ेंजाजनयम‍ऐुी‍भूजम‍के‍जाकाु‍और‍आुकी‍प्रदक्रया‍ूते ु‍जास्ट्तारपूावक‍जाारण‍प्रदान‍करत‍े ू।ैं 17.2 ऄनप्रु यजज्यता 17.2.1 यू‍नीजत‍जनम्नजलजखत‍कज‍छजड़कर‍दद.जा.प्रा./ुरकार‍द्वारा‍ुमय-ुमय‍पर‍यथा‍ऄजधुूजचत‍जचजन्ूत‍ दकए‍गए‍लडैं ‍पूललग‍क्षेत्रों‍म‍ेंला गू‍ूजगीः i) ूररत‍जाकाु‍क्षेत्र; ii) ऄनजधकृत‍कॉलजजनयों‍के‍ऄंतगतव ‍भूजम‍(जजन्ू‍ेंऄभी‍जनयजमत‍दकया‍जाना‍ू), ; iii) जनर्नमत‍लाल‍डजरा‍क्षेत्र‍(अबादी), गांाों‍के‍ऄजधुूजचत‍जास्ट्ताररत‍दकए‍गए‍लाल‍डजरा‍क्षेत्र; iv) मुकदमबाजी‍ााली‍भूजम, जजुमें‍मामल‍े के‍जनपटान‍ूजन‍े तक‍ऄजधग्रूण‍की‍कायवााूी‍के‍ऄधीन‍ भूजम‍िाजमल‍ू;, v) ऐुी‍भूजम‍जजनके‍जलए‍दद.जा.प्रा.‍ऄथाा‍दकुी‍ऄन्य‍ुरकारी‍एजेंुी‍ने‍ऄनापजि‍प्रमाणपत्र‍जारी‍ दकया‍ू‍, ऄथाा‍आु‍नीजत‍और‍आन‍जाजनयमों‍की‍ऄजधुूचना‍के‍ुमय‍दकुी‍ऄन्य‍ुरकारी‍ एजेंजुयों‍द्वारा‍जाकाु‍ूते ु‍यजजना‍कज‍ऄनुमजददत‍दकया‍गया‍ू,; vi) ऄजधुूजचत‍ानों/ुरकारी‍भूजम‍(जजुका‍ईपयजग‍ऄजनधावररत‍ू), ‍के‍ऄंतगवत‍भूजम‍और‍राष्ट्रीय‍ राजधानी‍क्षेत्र‍ददल्ली‍ुरकार‍की‍कजइ‍ऄन्य‍यजजना, जजुके‍जलए‍आन‍जाजनयमों‍की‍ऄजधुचूना‍ के‍ुमय‍ऄजधजनयम‍की‍धारा‍11(ए)‍के‍ऄतं गतव ‍भूजम‍ईपयजग‍में‍पररातवन‍प्रदक्रयाधीन‍ू;, vii) पूाव‍जाद्यमान‍ुंस्ट्थाएं‍जजन‍पर‍जनयजमजतकरण‍ूते ु‍जाचार‍दकया‍गया‍ू‍, ऄथाा‍ऄभी‍भी‍ुरकार‍ द्वारा‍जााँच‍के‍ऄधीन‍ू;, viii) ुड़कों, प्राकृजतक‍नालों, प्राकृजतक‍जलाियों, जाराुत‍स्ट्थलों, बाढ़‍एां‍लुचाइ‍जाभाग, रेलाे‍एां‍ ूााइ‍ऄड्ड‍ े‍के‍ऄंतगवत‍अने‍ााली‍भूजम;[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 105 17.2.2 यदद‍दकुी‍भूस्ट्ाामी‍के‍पाु‍ईपयुवि ‍ईपखडं ‍(ii)‍और‍(vii)‍के‍ऄतं गवत‍ुूचीबद्ध‍भूजम‍ू‍,और‍ाे‍भूजम‍नीजत‍ के‍ऄधीन‍भागीदार‍बनना‍चाूते‍ू,ैं तज‍ईन्ू‍ें भागीदारी‍की‍ऄपनी‍आच्छा‍्ि ‍करने‍ुे‍पूाव‍ुभी‍ बाधाओं‍कज‍दरू ‍करना‍ूजगा। 17.2.3 खंड‍17.2.1‍में‍ईजल्लजखत‍भूजम‍के‍ऄजतररि ‍िेी‍बची‍ुएइ‍ुभी‍भूजम‍''जाकाु‍यजग्य‍क्षेत्र'' कूलाएगी‍ और‍आुे‍पूललग‍ूते ‍ु ईपयजग‍में‍लाया‍जाएगा। 17.3 मागदव िी‍जुद्धातं 17.3.1 ‍‍लैंड‍पूललग,‍जनरूजपत‍ुेक्टरों‍(जाजनयमों‍में‍यथा‍पररभाजीत)‍के‍अधार‍पर‍की‍जाएगी‍और‍क्षेत्रीय‍ जाकाु‍यजजनाओं‍में‍अाश्यक‍ुंिजधन‍दद.म.ुयज.‍के‍प्रााधानों‍के‍ऄनुुार‍ऄनुमजददत‍ुेक्टर‍प्लान‍के‍ अधार‍पर‍ूोंगे। 17.3.2 ‍‍जचजन्ूत‍दकए‍गए‍लडैं ‍पूललग‍क्षेत्रों‍म‍ें भूजम‍के‍दकुी‍भी‍अकार‍के‍ुाथ‍भूस्ट्ाामी‍पंजीकरण‍कर‍ुकत‍े ू‍ैंऔर‍जाजनयमों‍में‍जनर्ददष्ट‍अाेदन‍प्रदक्रया‍के‍ऄनुुार‍भाग‍लेन‍े की‍ऄपनी‍आच्छा‍्ि ‍कर‍ुकते‍ू।ैं 17.3.3 ‍‍ुेक्टर‍के‍ऄदं र‍जाकाु‍यजग्य‍क्षेत्र‍की‍बाधामुि , न्यूनतम‍70%‍ुमीपस्ट्थ‍भूजम,‍ुेक्टर‍कज‍जाकाु‍ यजग्य‍बनाने‍के‍जलए‍पूल‍की‍जानी‍ऄपेजक्षत‍ू।, ‍आुुे‍दकुी‍ुेक्टर‍में‍जनयजजन,‍ुेाा‍प्रदायगी‍और‍ भूजम‍का‍ईप-जाभाजन/ुाझेदारी‍ुुजनजित‍ूज‍ुकेगा।‍जब‍दकुी‍ुेक्टर‍में‍यू‍न्यूनतम‍ुमीपस्ट्थता‍ ूाजुल‍कर‍ली‍जाएगी‍तज‍दद.जा.प्रा.‍ईु‍क्षेत्र‍के‍ुमीपस्ट्थ‍भूजम‍का‍भाग‍बनने‍ााल‍े ुभी‍ुंघटक‍ भू-स्ट्ााजमयों‍कज‍कंुजर्टटयम‍बनाने‍के‍जलए‍ुूजचत‍करेगा।‍दकुी‍ुेक्टर‍म‍ें अन‍े ााल‍े 2 ूक्े टेयर‍और‍ ईुुे‍ऄजधक‍के‍ऄलग‍भू-भाग, जज‍70%‍ुमीपस्ट्थ‍भूजम‍का‍जूस्ट्ुा‍नूीं‍ू,, ाे‍भी‍कंुजर्टटयम‍का‍ भाग‍बनन‍ेूते ‍ु पात्र‍ूोंग‍े बित‍ेंाे‍ुेक्टर‍ल-े अईट‍के‍ुाथ‍एकीकृत‍ूज‍ुकते‍ूज। 17.3.4 ‍‍पलू ‍की‍गइ‍भूजम‍में‍ुे‍कंुजर्टटयम‍60%‍ऄपने‍पाु‍रखगें े‍और‍िेी‍40%‍आु‍यजजना‍के‍मानदंड़ों‍के‍ ऄनुुार‍ िूर‍ स्ट्तरीय‍ भौजतक‍ ऄाुरंचना, मनजरंजनात्मक,‍ औद्यजजगक‍ और‍ ुाावजजनक/ऄध‍व ुाावजजनक‍(पीएुपी)‍ुुजाधाओं‍के‍जाकाु‍ूते ु‍दद.जा.प्रा./ुेााप्रदाता‍एजेंजुयों‍कज‍ऄपेजक्षत‍ूजन‍े पर‍ऄभ्यर्नपत‍करने‍के‍जलए‍दद.जा.प्रा.‍की‍ओर‍ुे‍रखेंगे।‍प्रत्येक‍भू-स्ट्ाामी‍ऐुी‍ुुजाधाओं‍के‍प्रााधान‍ ूते ु‍पलू ‍की‍गइ‍भूजम‍क्षेत्र‍की‍अनुपाजतक‍भूजम‍ऄभ्यर्नपत‍करेगा। 17.3.5 ‍‍कंुजर्टटयम‍द्वारा‍60%‍भूजम‍का‍ईपयजग‍अााुीय, ्ााुाजयक, ुाावजजनक‍और‍ऄधव‍ुाावजजनक‍ ुुजाधाओं‍तथा‍भौजतक‍ऄाुंरचना‍के‍जाकाु‍के‍जलए‍दकया‍जाएगा। 17.3.6 ‍‍कंुजर्टटयम‍जाकजुत‍भूजम‍/‍जनर्नमत‍स्ट्थान‍के‍पुनर्नातरण‍ऄथाा‍''कायावन्ायन‍यजजना'' के‍एक‍जूस्ट्ुे‍के‍ रूप‍में‍ईजचत‍अदान-प्रदान‍के‍दकुी‍ऄन्य‍रूप‍के‍जलए‍अपुी‍तौर‍पर‍एक‍फामूवला‍जनधावररत‍करेगा‍ और‍आु‍फामूवल‍े कज‍ुभी‍भ-ू स्ट्ााजमयों‍की‍ुूमजत‍ुे‍दद.जा.प्रा.‍कज‍ुूजचत‍करेगा। 17.3.7 ‍‍कंुजर्टटयम‍द्वारा‍60%‍भूजम‍का‍ऄंजतम‍रूप‍म‍ें जाकाु‍अाश्यक‍ऄनुमजदन‍की‍प्राजप्त‍के‍ईपरान्त‍ूी‍ अरंभ‍दकया‍जाएगा।‍60%‍भूजम‍का‍जाकाु‍भी‍ऄलग‍ईप-पररयजजनाओं‍के‍रूप‍में‍ईन‍भ-ू स्ट्ााजमयों/भू-स्ट्ााजमयों‍के‍ुमूू‍द्वारा‍दकया‍जा‍ुकता‍ू‍, जजन्ूोंने‍ऄलग‍जाकाुकताव‍ुंस्ट्था‍(डीइ)‍के‍ रूप‍म‍ें कायव‍करन‍े का‍जाकल्प‍जलया‍ूज‍और‍यू‍तभी‍ूजगा‍जब‍कंुजर्टटयम‍द्वारा‍ुमग्र‍एकीकृत‍106 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] यजजना‍पूरी‍कर‍ली‍गइ‍ूज‍और‍ुभी‍ुमुजचत‍ऄनुमजदन‍प्राप्त‍कर‍जलए‍गए‍ूों।‍जाकाुकताव‍ुंस्ट्था‍ (डीइ)‍ूज‍ुकत‍े ू,ैं जजः- i) कजइ‍्जि गत‍भू-स्ट्ाामी‍जजुने‍न्यनू तम‍2‍ूक्े टेयर‍भूजम‍कज‍जजड़कर‍ुेक्टर‍म‍ें भूजम‍के‍एक‍ ऄथाा‍ऄजधक‍प्लॉटों‍कज‍पूल‍दकया‍ू,; ii) भू-स्ट्ााजमयों‍का‍ुमूू‍जजन्ूजन‍े ुामूजूक‍रूप‍ु‍े न्यूनतम‍2‍ूक्े टेयर‍तक‍की‍भूजम‍जजड़कर‍एक‍ ऄथाा‍एक‍ुे‍ऄजधक‍प्लॉट‍पलू ‍दकए‍ूों, और‍जाकाु‍करने‍के‍जलए‍ा,ध‍और‍काननू ी‍रूप‍ुे‍लाग‍ू करार‍के‍मा्यम‍ुे‍ुमूू‍बनाया‍ूज; iii) कानूनी‍तौर‍पर‍बा्यकारी‍करार‍के‍मा्यम‍ुे‍न्यूनतम‍2‍ूक्े टेयर‍तक‍के‍एक‍ऄथाा‍ऄजधक‍ भूखण्ड‍ पूल‍ करन‍े ााले‍ ‍ भू-स्ट्ााजमयों‍ का‍ प्रजतजनजधत्ा‍ करने‍ ााली‍ एक‍ ुस्ट्ं था‍ (जाकाुकताव/्ाुाय/कापोरेट‍ुंस्ट्था)।‍ जाकाु‍के‍जलए‍भूजम‍का‍पयावप्त‍ररटन‍व ुुजनजित‍करने‍ूते ‍ु 2‍ूक्े टेयर‍की‍ुीमा‍जनधावररत‍की‍गइ‍ ू।, 17.3.8 ‍‍दद.म.ुयज.‍के‍ऄनुुार‍नए‍जाकाु‍क्षेत्र‍म‍ें अर्नथक‍रूप‍ुे‍कमजजर‍ागों‍के‍जलए‍पयावप्त‍अााु‍का‍ प्रााधान‍ुुजनजित‍दकया‍जाएगा। 17.3.9 ‍‍िूर‍स्ट्तरीय‍ऄाुंरचना‍ईपलब्ध‍करान‍े के‍जलए‍ाास्ट्तजाक‍लागत‍कज‍कार‍करन‍े ूते ु‍पलू ‍की‍गइ‍ ुंपूणव‍भूजम‍पर‍बाह‍य‍जाकाु‍प्रभार‍(इडीुी)‍लाग‍ूूजगा। 17.3.10 ऐुे‍क्षेत्र‍म‍ें प्लॉट, जज‍पलू ‍दकए‍बगर, ‍बन‍े रूते‍ू,ैं ईन्ू‍ें बाद‍के‍चरण‍म‍ें जाकजुत‍करन‍े की‍ऄनुमजत‍दी‍ जा‍ुकती‍ू,, जज‍जनम्नजलजखत‍ितों‍के‍ऄधीन‍ूजगीः i) प्रस्ट्ताजात‍लअे ईट‍यजजना‍की‍पुएचं ‍और‍ऄन्य‍प्रकायावत्मक‍अाश्यकताओं‍के‍ुंबंध‍म‍ें ्ाूायवता। ii) िूर‍स्ट्तर‍की‍ऄाुंरचना/ुुजाधाओं‍ूते ‍ु 45%‍ऄथाा‍ुमय-ुमय‍पर‍प्राजधकरण‍द्वारा‍ जनधावररत‍दकए‍ऄनुुार‍भूजम‍ईपलब्ध‍करना। iii) ऄाुंरचना‍और‍ुेााओं‍के‍जलए‍ऄद्यतन‍तौर‍पर‍लाग‍ूइडीुी‍का‍भुगतान‍करना। 17.4 दद.जा.प्रा.‍और/ऄथाा‍ुरकार‍की‍भजू मका 17.4.1 ‍‍नीजत‍का‍ुुचारू‍एा‍ंजनष्पक्ष‍तौर‍पर‍कायावन्ायन‍ुुजनजित‍करना। 17.4.2 ‍‍िूर‍स्ट्तरीय‍भौजतक‍ऄाुंरचना, मनजरंजनात्मक,‍औद्यजजगक‍और‍ुाावजजनक‍/‍ऄध‍व ुाावजजनक‍ (पीएुपी)‍ुुजाधाओं‍की‍्ास्ट्था‍ूते ु‍दद.जा.प्रा.‍और‍ुेााप्रदाता‍एजेंजुयों‍द्वारा‍ईपयजग‍की‍जान‍े ााली‍भूजम‍के‍ुंबंध‍म‍ेंुेक्टर‍की‍ुीमाओं‍का‍पररुीमन‍करना‍और‍ुमग्र‍यजजना‍त,यार‍करना। 17.4.3 ‍‍अाेदन, ुत्यापन, ऄनुमजदन, लाआुेंु‍अदद‍ूते ु‍ुमयबद्ध‍तरीके‍ुे‍एकल-जखड़की‍प्रणाली‍के‍मा्यम‍ ुे‍जाकाुकताव‍ुंस्ट्था‍/‍कंुजर्टटयम‍द्वारा‍यजजना‍एां‍जाकाु‍की‍ुंपूण‍व प्रदक्रया‍कज‍ुुजाधा‍प्रदान‍ करना, ज,ुा‍दक‍जाजनयमों‍में‍जनर्ददष्ट‍दकया‍गया‍ू।, 17.4.4 ‍‍ुेााप्रदाता‍एजेंजुयों‍द्वारा‍ुमयबद्ध‍तरीके‍ुे‍जल-अपूर्नत, ुीारेज, जल-जनकाुी, जबजली, परराून‍ अदद‍के‍जलए‍प्राुंजगक‍ऄाुंरचना‍की‍्ास्ट्था‍की‍ुमग्र‍तौर‍पर‍जनगरानी‍करना।.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 107 17.4.5 ‍‍कजइ‍भूजम‍जजुका‍लडैं ‍पूललग‍के‍ऄतं गतव ‍प्रस्ट्ताा‍नूीं‍दकया‍गया‍ूज, और‍जज‍दकुी‍ुेक्टर‍में‍नीजत‍कज‍ लाग‍ू करन‍े के‍जलए‍ऄपेजक्षत‍ूज, ईनका‍कानून‍के‍ऄनुुार‍ऄजधग्रूण‍करना।‍ऐुे‍ऄजधग्रूण‍की‍लागत‍ कज‍जाकाुकताव‍ुंस्ट्था/कंुजर्टटयम‍द्वारा‍ाून‍दकया‍जाएगा। 17.5 जाकाुकता‍वुस्ट्ं था‍(डीइ)/कंुजर्टटयम‍की‍भजू मका 17.5.1 जनधावररत‍मानदडं ज‍और‍ददिाजनदेिों‍के‍तूत‍लडैं ‍पूललग‍के‍ऄनुुार‍क्षेत्रों‍के‍जाकाु‍के‍जलए‍ एकीकृत‍यजजना, ुेाा‍प्रदायगी‍तथा‍भूजम‍के‍ईपजाभाजन/ुाझेदारी‍ूते ु‍ऄथाा‍दकुी‍ऄन्य‍ पररभाजीत‍कायव‍के‍जलए‍ुंघटक‍भू-स्ट्ााजमयों‍का‍एक‍कंुजर्टटयम‍बनाया‍जाएगा। 17.5.2 खंड‍17.3.6‍के‍ऄनुुार‍ुभी‍ुंघटक‍भू-स्ट्ााजमयों‍के‍ऄनुमजदन‍ुे‍लाग‍ू यजजना‍का‍जाकाु‍दकया‍ जाएगा‍तथा‍ऄंजतम‍रूप‍ददया‍जाएगा। 17.5.3 ुभी‍डीइ/भ-ू स्ट्ााजमयों‍कज‍िाजमल‍करते‍ुएए‍एक‍प्ररामिवदात्री‍प्रदक्रया‍के‍मा्यम‍ुे‍यजजना‍के‍ प्रााधानों‍के‍ऄनुुार‍60%‍भूजम‍ूते ु‍लअे ईट‍यजजना‍और‍जास्ट्तृत‍ुाआट‍प्लान‍त,यार‍करना। 17.5.4 जब‍कभी‍अाश्यक‍ूज, दद.जा.प्रा./ुेााप्रदाता‍एजेंजुयों‍कज‍ुपु ुद‍व की‍जान‍े ााली‍भूजम‍(ऄजतक्रमण‍ ुे‍मुि )‍की‍जनगरानी‍का‍काय‍वकरना‍। 17.5.5 एकल-जखड़की‍ प्रणाली‍ के‍ मा्यम‍ ुे‍ तथा‍ जाजनयामकों‍ में‍ जनर्ददष्ट‍ ुमयुीमा‍ के‍ ऄनुुार‍ ुाावजजनक‍ऄाुंरचना‍एां‍ुाे ाओं‍कज‍जाकजुत‍करन‍े की‍लागत‍ूते ‍ु दद.जा.प्रा.‍और‍ुेााप्रदाता‍ एजेंजुयों‍कज‍बाह्य‍जाकाु‍प्रभारों‍(इडीुी)‍का‍ुमय‍पर‍भुगतान‍करना।‍इडीुी‍का‍भुगतान‍पलू ‍ की‍गइ‍पूरी‍भूजम‍पर‍देय‍ूजगा। 17.5.6 दद.जा.प्रा.‍द्वारा‍स्ट्थाजपत‍एकल-जखड़की‍प्रणाली‍के‍मा्यम‍ु‍े लेअईट‍प्लान, जास्ट्तृत‍ुाआट‍प्लान‍ एां‍ऄन्य‍ड्राआंगज‍ूते ‍ु अाश्यक‍ऄनुमजदन‍प्राप्त‍करना। 17.5.7 भूजम‍के‍ईु‍भाग‍म‍ें अने‍ााली‍यथा‍अाश्यक‍मल्टी-लेाल‍पार्ककग‍ुुजाधाओं‍के‍प्रााधान‍ुजूत‍ ुभी‍अंतररक‍ुड़कों‍तथा‍ऄन्य‍ुंबंजधत‍ऄाुंरचना, ज,ुे‍जल‍अपूर्नत‍लाआनों, जाद्युत‍अपूर्नत, ाीाव‍जल‍ुंचयन, ुीाेज‍िजधन‍ुंयंत्र‍और‍पार्ककग‍का‍ुमयबद्ध‍जाकाु‍करना। 17.5.8 जब‍तक‍दक‍प्रस्ट्ताजात‍क्षेत्र‍के‍रखरखाा‍का‍कायव‍ुंबंजधत‍स्ट्थानीय‍जनकाय‍कज‍नूीं‍ुौंपा‍जाता, तब‍तक‍ऄनुमजददत‍लेअईट‍प्लान‍के‍ऄनुुार‍खलु े‍स्ट्थानों, ुड़कों‍और‍ुेााओं‍ज,ुी‍ुभी‍स्ट्थानीय‍ स्ट्तरीय‍ुुजाधाओं‍कज‍िाजमल‍करत‍े ुएए‍ुंपूण‍व जाकाु‍का‍ुमयबद्ध‍जाकाु‍एां‍रखरखाा‍करना।‍ स्ट्थानीय‍जनकाय‍कज‍ुेााएं‍ुौंपने‍के‍ुमय‍यदद‍प्रभारों‍म‍ें दकुी‍प्रकार‍की‍जाुंगजत‍ूज‍तज‍ईुका‍ ाून‍जाकाुकताव‍ुंस्ट्था/कन्ुजर्टटयम‍द्वारा‍दकया‍जाएगा। 17.5.9 जनर्नमत‍स्ट्थान/भूजम‍के‍जूस्ट्ु‍े का‍ुंघटक‍भू-स्ट्ााजमयों/डीइ‍कज‍ुमयबद्ध‍ूस्ट्तांतरण, ज,ुा‍दक‍ कायावन्ायन‍में‍अपुी‍तौर‍पर‍ुूमजत‍की‍गइ‍ूज। 17.5.10 आु‍यजजना‍के‍प्रााधानों‍के‍ऄनुु ार‍अर्नथक‍रूप‍ु‍े कमजजर‍ागों‍ूते ‍ु अााु‍घटक‍के‍तूत‍जनर्ददष्ट‍ जनर्नमत‍स्ट्थान/अााुीय‍आकाआयों‍का‍जाकाु‍ुुजनजित‍करना।‍इडब्ल्यूएु‍अााु‍स्ट्टॉक‍की‍जबक्री‍ और‍जनपटान‍यजजना‍के‍ऄनुुार‍दकया‍जाएगा। 17.5.11 दद.जा.प्रा.‍द्वारा‍ुाावजजनक‍ईद‍द् ेश्य‍ूते ‍ु जाजधात‍ऄर्नजत‍भूजम‍के‍ऄजधग्रूण‍की‍लागत‍का‍ाून‍ करना, जजुुे‍दक‍जजनों‍और‍क्षत्रे ों‍में‍जूां‍लैंड‍पूललग‍नीजत‍लागू‍ूज‍ाूां‍ऄाुंरचना‍के‍जनयजजजत‍ जाकाु‍कज‍ुुजनजित‍दकया‍जा‍ुके। 17.6 जाकाु‍के‍मानदडं 17.6.1 जाकाु‍ूते ु‍जनम्नजलजखत‍ित‍ेंलागू‍ूोंगीः108 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] i) प्रत्येक‍क्षेत्र‍में‍पूल‍की‍गइ‍भूजम‍का‍न्यूनतम‍40%‍िूर‍स्ट्तरीय‍ऄाुंरचना‍तथा‍ऄन्य‍ईपयजगों‍ (जब‍भी‍ऄपेजक्षत‍ूज‍दद.जा.प्रा.‍और‍ुेाा‍प्रदाता‍एजेंजुयों‍कज‍ऄभ्यर्नपत)‍के‍जलए‍अरजक्षत‍ूजगा।‍ ुेक्टर‍में‍औद्यजजगक‍और‍पीएुपी‍भूजम‍ईपयजग‍(ुंदभव‍ताजलका‍17.1) का‍दद.जा.प्रा.‍के‍जूस्ट्ुे‍ कज िूर/क्षेत्रीय‍स्ट्तर‍की‍ुुजाधाएं‍प्रदान‍करने‍की‍अाश्यकताओं‍कज‍पूरा‍करने‍के‍जलए, अुन्न‍ क्षेत्रों‍के‍ुाथ‍क्लब‍करने‍की‍ऄनुमजत‍दी‍जाएगी।‍प्रत्येक‍ुेक्टर‍में‍पूल‍की‍गइ‍भूजम‍का‍ऄजधकतम‍ 60%‍जूस्ट्ुा‍जाकाु‍ूते ु‍जाकाुकताव‍ुंस्ट्था/कन्ुजर्टटयम‍के‍जलए‍ईपलब्ध‍ूजगा।‍भूजम‍ईपयजगों‍ का‍जातरण‍जनम्न‍प्रकार‍ूजगाः ताजलका‍17.1‍लडैं ‍पलू लग‍क्षत्रे ों‍म‍ेंभजू म‍ईपयजगों‍का‍जातरण पलू ‍की‍गइ‍भजू म‍का‍क्षत्रे भजू म‍ईपयजग न्यनू तम‍40%* ऄजधकतम‍60% ुकल‍अााुीय -- 53% ्ााुाजयक -- 5% औद्यजजगक 4% -- मनजरंजनात्मक 16% -- पीएुपी 8% 2% ुड़के‍और‍पररचालन 12% -- * प्रत्येक‍क्षेत्र‍म‍ें 40%‍भूजम‍का‍ईपयजग‍दकुी‍भी‍ईपयजग‍के‍जलए‍अाश्यकतानुुार‍दकया‍जा‍ुकता‍ ू।, ‍दद.जा.प्रा.‍के‍जलए‍दकुी‍जािेी‍क्षेत्र‍म‍ें भूजम‍के‍एक‍जनजित‍प्रजतित‍का‍ईपयजग‍करने‍की‍कजइ‍ जनधावररत‍ुीमा‍नूीं‍ूजगी।‍ूालााँदक, जजन‍का‍कुल‍प्रजतित‍ईपयुवि ‍ताजलका‍ के‍ऄनुुार‍ूजगा। 17.6.2 ‍‍ुकल‍अााुीय‍क्षेत्रों‍का‍जाभाजन‍एां‍ुुजाधाओं‍का‍प्रााधान‍यजजना‍में‍जनर्ददष्ट‍मानदंडों‍के‍ऄनुुार‍ ूजगा।‍लअे ईट‍प्लान‍म‍ें जचजन्ूत‍अुपाु‍की‍अतं ररक‍ुड़कें‍/‍ऄाुंरचना‍/‍ुेााएं‍(जल‍अपूर्नत‍ लाआन,ें जाद्युत‍अपूर्नत, ाीाव‍जल‍ुंचयन, एुटीपी, आत्यादद)‍के‍प्रााधान‍ूते ‍ु भूजम‍की‍अाश्यकताए‍ं ुभी‍भू-स्ट्ााजमयों‍/‍जाकाुकताव‍ुंस्ट्थाओं‍द्वारा‍ुमान‍रूप‍ुे‍परू ी‍की‍जाएंगी। 17.6.3 ‍‍दकुी‍ुेक्टर‍म‍ें ुकल‍अााुीय‍ईपयजग‍(53%) के‍ऄंदर‍स्ट्थानीय‍स्ट्तर‍की‍स्ट्ाास्ट््य‍एां‍ि,क्षजणक‍ ुुजाधाओं‍के‍जलए‍जनधावररत‍50%‍प्लॉटों‍कज‍दद.जा.प्रा.‍कज‍ुरकारी‍एजेंजुयों/जाभागों‍कज‍अबंटन‍ ूते ु‍लौटाया‍जाएगा। 17.6.4 ‍‍िूर‍स्ट्तरीय‍पीएुपी‍प्लॉट‍के‍ुाथ-ुाथ‍्ााुाजयक‍प्लॉट‍के‍ुमामेलन‍और‍ईप-जाभाजन‍की‍ ऄनुमजत‍दी‍जाएगी।‍यजजना‍के‍ऄनुुार‍न्यूनतम‍क्षेत्र‍की‍अाश्यकताएं, दकुी‍भी‍ईपयजग‍पररुर‍के‍ जाकाु‍के‍जलए‍लाग‍ू ूोंगी।‍जाकाुकताव‍ुंस्ट्था‍/‍कन्ुजर्टटयम, भान‍के‍ऄंदर‍ईपयजगों‍के‍ार्टटकल‍ जमश्रण‍(अााुीय, ्ााुाजयक, पीएुपी‍और‍औद्यजजगक)‍कज‍प्राप्त‍करन‍े के‍जलए‍नए‍तरीकों‍का‍ ईपयजग‍भी‍कर‍ुकता‍ू।, 17.7 ऄजतररि ‍जाकाु‍जनयत्रं ण 17.7.1 ुेक्टर‍स्ट्तर‍पर‍लागू‍एफएअर‍में‍जभन्नताः i) ुेक्टर‍स्ट्तर‍पर‍जाजभन्न‍भूजम‍ईपयजगों‍के‍जलए‍जनधावररत‍एफएअर‍ुीमा‍की‍गणना, नीचे‍दी‍गइ‍ ताजलका‍के‍ऄनुुार‍की‍जाएगीः[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 109 ताजलका‍17.2‍ुक्े टर‍स्ट्तर‍पर‍जाजभन्न‍भजू म‍ईपयजगों‍ूते ‍ुएफएअर‍ुीमा क्र.ु.ं भजू म‍ईपयजग‍ एफएअर एफएअर‍के‍ऄनुु ार‍जनर्माण‍दकए‍जान‍ेााला‍ कुल‍क्षत्रे * 1 अााुीय 200 200 x कुल‍अााुीय‍भूजम‍ (कुल‍अााुीय‍भूजम, ुकल‍अााुीय‍भूजम‍का‍ ऄजधकतम‍55%‍ूजना‍चाजूए, जजु‍पर‍खंड‍ 17.7.4 और‍17.7.5 के‍ऄनुुार‍लेअईट‍और‍ प्लॉट‍स्ट्तर‍जनयंत्रण‍कज‍परूा‍करने‍पर‍ुमूू‍ अााु‍और‍प्लॉरटड‍अााु‍टाआपजलॉजी‍के‍ जमश्रण‍की‍ऄनुमजत‍ूजगी।)[क] 2 ्ााुाजयक 150 पूल‍की‍गइ‍भूजम‍का‍150 x 5% [ख] 3 पीएुपी 225 पूल‍की‍गइ‍भूजम‍का‍225 x 10% [ग] 4 औद्यजजगक 200 पूल‍की‍गइ‍भूजम‍का‍200 x 4% [घ] ुेक्टर‍स्ट्तर‍पर‍एफएअर‍के‍ऄनुु ार‍कुल‍क्षत्रे ‍ जजुका‍जनमाणव ‍दकया‍जा‍ुकता‍ू ,[यजग]= क‍+‍ ख‍+‍ग‍+‍घ *नजटः क) आुके‍ऄलााा, ऄजधकतम‍स्ट्ाीकायव‍अााुीय‍एफएअर‍के‍ऄजतररि ‍15 प्रजतित‍की‍ऄजनाायव‍एफएअर, केाल‍ इडब्ल्यूएु‍ अााु‍ के‍ प्रााधान‍ के‍ जलए‍ डीइ/कंुजर्टटयम‍ कज‍ ईपलब्ध‍ ूजगा।‍ इडब्ल्यूएु‍ अाश्यकताओं‍ की‍ परू े‍ ऄनुमये ‍ अााुीय‍ एफएअर‍ ूते ु‍ गणना‍ की‍ जानी‍ चाजूए‍ (चाू‍े अााु‍ टाआपजलॉजी‍क,ुी‍भी‍ूज); ख) ुामाजजक‍ऄाुंरचना‍और‍ईपयजजगताओं‍(ुकल‍अााुीय‍घटक‍के‍तूत‍प्रदान‍दकए‍जाने‍ााले‍स्ट्थानीय‍ स्ट्तर‍तक)‍ूते ‍ु ऄनुमेय‍एफएअर‍की‍गणना‍दद.मु.यज.‍के‍जनुंख्या‍मानदडं ों‍के‍अधार‍पर‍अााुीय‍ एफएअर‍के‍ऄजतररि ‍की‍जाएगी; ग) कंुजर्टटयम/डीइ‍और‍दद.जा.प्रा.‍के‍बीच‍पीएुपी‍भूजम‍ईपयजग‍का‍जातरण, ताजलका‍17.2 के‍ऄनुुार‍ ूजगा।‍पीएुपी‍के‍प्लॉट‍प्रचजलत‍ के‍ऄनुुार‍एफएअर‍का‍लाभ‍ईठा‍ुकत‍े ूैं, बिते‍दक‍ ुेक्टर‍में‍कुल‍पीएुपी‍एफएअर‍उपर‍ईजल्लजखत‍(ग)‍और‍टीडीअर,‍यदद‍लागू‍ूज,‍ुे‍ऄजधक‍नूीं‍ूज । ii) एक‍ुेक्टर‍के‍जलए‍कुल‍लागू‍एफएअर‍ुे‍ऄजधक‍के‍जबना‍एफएअर‍लजलडग‍ऄलग-ऄलग‍प्लॉटों‍ में‍जभन्न‍ूज‍ुकती‍ू,, केाल‍ईन‍क्षेत्रों‍कज‍छजड़कर‍जूां‍टीडीअर‍का‍ईपयजग‍दकया‍जाएगा, जजुके‍तूत‍ईच्च‍एफएअर‍का‍ईपयजग‍प्रमुख‍ुड़कों‍के‍ुाथ, पूचान‍दकए‍गए‍रांजजट‍स्ट्टेिनों‍ के‍अुपाु, ऄथाा‍ऄन्य‍पूचान‍दकए‍गए‍स्ट्थानों‍पर‍दकया‍जा‍ुकता‍ू।, iii) यदद‍ुाआट‍की‍दिाओं‍या‍जनयजजन‍ुंबंधी‍जाचारों‍के‍कारण‍कंुजर्टटयम‍कज‍60%‍भूजम‍की‍ ाापुी‍में‍कमी/जभन्नता‍पायी‍जाती‍ू,, तज‍कंुजर्टटयम/डीइ‍कज‍ऄपने‍ुंबंजधत‍एफएअर‍का‍ ईपयजग‍करने‍की‍ऄनुमजत‍ूजगी। iv) ग्राम‍ुभा‍भूजम‍कज‍क्षेत्र‍के‍जलए‍ुमग्र‍लेअईट‍प्लान‍म‍ें एकीकृत‍दकया‍जाएगा।‍ऐुी‍भूजम‍का‍ ईपयजग‍जनम्नानुुार‍ूजगाः 17.7.1.1 दद.जा.प्रा.‍लैंड‍पूललग‍म‍ें जाकाुकताव‍ुंस्ट्था‍के‍रूप‍में‍भाग‍ल‍ेुकता‍ू,; (जाकाुयजग्य‍ क्षेत्र‍का‍जूस्ट्ुा)110 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 17.7.1.2 दद.जा.प्रा.‍ुंबंजधत‍क्षेत्रों‍की‍जाजिष्ट‍अाश्यकताओं/कमी‍‍कज‍पूरा‍करने‍के‍जलए‍ऐुी‍ भूजम‍जाकजुत‍कर‍ुकता‍ू।, ‍ऐुे‍मामलों‍में,‍ईन्ू‍ें ताजलका‍2 के‍ऄनुुार‍एफएअर‍की‍ गणना‍के‍जलए‍पलू ‍की‍गइ‍भूजम‍का‍जूस्ट्ुा‍नूीं‍माना‍जाएगा, और‍मानदडं ों‍के‍ऄनुुार‍ जाजभन्न‍ईपयजग‍पररुरों‍के‍जलए‍जाकजुत‍दकया‍जाएगा।‍(जाकाुयजग्य‍क्षेत्र‍का‍जूस्ट्ुा‍ नूीं) 17.7.2 लाग‍ूएफएअर‍म‍ेंजभन्नता‍कज‍जनम्नजलजखत‍जाकल्पों‍के‍मा्यम‍ुे‍ऄनुमजत‍दी‍जाएगीः i) ुेक्टरों‍के‍ऄंदर‍भूजम‍ईपयजग‍का‍अदान-प्रदानः 17.7.2.1 कंुजर्टटयम‍ के‍ जलए‍ -‍ ऄपन‍े जूस्ट्ुे‍ के‍ तूत‍ ुेक्टर-स्ट्तरीय‍ ्ााुाजयक‍ और/ऄथाा‍पीएुपी‍क्षेत्र‍कज‍आुके‍कुल‍क्षेत्र‍म‍ें ुमान‍कमी‍करत‍े ुएए‍प्रत्येक‍कज‍30%‍ तक‍बढ़ाया‍जा‍ुकता‍ू,, जजुे‍अााुीय‍एफएअर‍के‍ऄनुुार‍जनर्नमत‍दकया‍जा‍ुकता‍ ू।, 17.7.2.2 दद.जा.प्रा.‍के‍जलए, ऄपने‍जूस्ट्ुे‍के‍तूत‍ुेक्टर-स्ट्तरीय‍पीएुपी‍और‍औद्यजजगक‍ क्षेत्र‍के‍बीच‍30%‍तक‍के‍अदान-प्रदान‍की‍ऄनुमजत‍दी‍जाएगी; ii) टीडीअर‍के‍ईपयजग‍कज‍केाल‍जचजन्ूत‍टीडीअर‍प्राजप्त‍क्षेत्रों‍में‍ऄनुमजत‍दी‍जाएगी। 17.7.3 जमजश्रत‍ईपयजग‍/ार्टटकल‍जमलक्ुगः i) प्लॉटों‍और‍आमारतों‍के‍भीतर‍ार्टटकल‍जमलक्ुग‍(ाीएम)‍की‍ऄनुमजत‍दी‍जाएगी, तादक‍भान‍ टाआपजलॉजी‍और‍ूब‍म‍ें जमजश्रत‍ईपयजग‍कज‍ुक्षम‍बनाया‍जा‍ुके, नााचारी‍ूररत‍लअे ईट‍का‍ जनमावण‍दकया‍जा‍ुके‍और‍पयावप्त‍ुाावजजनक‍ुुजाधाओं‍का‍प्रााधान‍दकया‍जा‍ुके।‍ार्टटकल‍ जमलक्ुग‍के‍जलए‍ईपयजगों‍का‍जनयंत्रण‍और‍जमश्रण‍जनम्नानुुार‍ूजगाः 17.7.3.1 ुेक्टर‍लेअईट‍यजजना‍म‍ें जचजननत‍दकए‍गए‍ऄनुमजददत‍ार्टटकल‍जमलक्ुग‍प्लॉटों‍म‍ें जमजश्रत‍ईपयजग/ार्टटकल‍जमलक्ुग‍की‍ऄनुमजत‍दी‍जाएगी, जूां‍ऐुे‍प्लॉटों‍पर‍ुमग्र‍ एफएअर‍400‍ुे‍ऄजधक‍नूीं‍ूजना‍चाजूए। 17.7.3.2 लजलडग‍नीच‍े ददय‍े गए‍ईप‍खंड-(छ)‍के‍ऄनुुार‍एक‍ूी‍भूजम‍ईपयजग‍ऄथाा‍जचजन्ूत‍ दकए‍जाने‍ााले‍ऄनुकूल‍भूजम‍ईपयजग/गों‍के‍रूप‍में‍ूज‍ुकती‍ू।, ‍ 17.7.3.3 दकुी‍भी‍ऄनुपात‍म,ें दकुी‍प्लॉट‍के‍भीतर‍ऄलग-ऄलग‍आमारतों‍के‍रूप‍म,ें या‍ आमारतों‍के‍भीतर‍तल‍की‍ार्टटकल‍जमलक्ुग ऄथाा‍दजनों‍में‍दकुी‍भी‍ऄनुपात‍म‍ें जचजननत‍ दकए‍गए‍ईपयजग‍के‍जमश्रण‍की‍ऄनुमजत‍ूजगी। 17.7.3.4 जचजन्ूत‍दकए‍गए‍प्लॉट‍के‍भीतर‍खुली‍जगू, ुुजाधाएं, पार्ककग, प्राेि/जनकाु‍और‍ ुेाा‍कजर‍अदद‍के‍ुंबंध‍में‍अाश्यकताएाँ‍यजजना‍ऄथाा‍लागू‍जनयमों‍के‍मानदंडों‍के‍ ऄनुुार‍ूोंगी। 17.7.3.5 प्रत्येक‍ईपयजग‍के‍जलए‍पृथक‍प्राेि/जनकाु‍और‍ुर्नाु‍कजर‍की‍्ास्ट्था‍की‍जाएगी।‍ टीडीअर‍के‍ईपयजग‍के‍कारण‍ऄजतररि ‍अाश्यकता,‍यदद‍कजइ‍ू,,‍कज‍ईुी‍प्लॉट‍के‍ऄंदर‍ पूरी‍तरू‍ुे‍पूरा‍दकया‍जाएगा। 17.7.3.6 मनजरंजनात्मक‍ पाकों, ऄस्ट्पतालों, स्ट्ाास्ट््य‍ ुुजाधा, जािजाद्यालय‍ पररुरों, ईपयजजगताओं, ईंधन‍स्ट्टेिनों‍और‍दकुी‍भी‍प्रकार‍की‍ुुधार / दंडात्मक‍ुुजाधाओं‍के‍ जमश्रण / ार्टटकल‍जमलक्ुग की‍ऄनुमजत‍नूीं‍दी‍जाएगी। 17.7.3.7 जमश्रण‍कज‍केाल‍जनम्न‍प्रकार‍ु‍े ुंगत‍ईपयजगों‍के‍जलए‍ूी‍ऄनमु जत‍दी‍जाएगीः[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 111  केाल‍ग,र-जाजनमावण‍ईद्यजग‍ज,ुे‍ुेाा‍ईद्यजग‍(अइटी/अइटीइएु, बीपीओ‍/‍ केपीओ, अदद), प,केलजग‍और‍लॉजजजस्ट्टक्ु, और‍गर, -प्रदीू णकारी‍एमएुएमइ‍ आकाआयों‍कज‍पीएुपी‍और‍कॉमुव‍के‍ुाथ‍जमलाया‍जा‍ुकता‍ू।,  स्ट्कूलों‍कज‍केाल‍अााुीय‍ईपयजग‍पररुर‍के‍ुाथ‍जमलाया‍जा‍ुकता‍ू।, ‍ऄन्य‍ ि,क्षजणक‍ुंस्ट्थानों‍कज‍स्ट्ाच्छ‍ईद्यजगों, ज,ुा‍दक‍उपर‍ईजल्लजखत‍ू,,‍के‍ुाथ‍ जजड़ा‍जा‍ुकता‍ू।, 17.7.3.8 ार्टटकल‍जमलक्ुग के‍ईपयजग‍के‍कारण‍ऄजधिेी‍भूजम‍(यदद‍कजइ‍ू), ‍का‍ईपयजग‍ ुदक्रय‍ूररत‍क्षेत्र, ज,ुे‍िूरी‍खेती, नुवरी, बागानों‍के‍जलए‍दकया‍जाएगा। 17.7.4 लडैं ‍पलू लग‍ुक्े टरों‍म‍ेंलअे ईट‍जनयत्रं ण i) लेअईट‍प्लान‍जनम्नजलजखत‍कज‍आंजगत‍करेगाः क) यजजना‍के‍ऄनुुार‍ईपयजग‍जजनों/ईपयजग‍पररुरों‍कज, ख) डीइ/कंुजर्टटयम‍कज‍लौटाए‍गए‍पुनर्नातररत‍प्लॉटों‍कज, और ग) ार्टटकल‍जमलक्ुग प्लॉट, जमजश्रत‍ईपयजग और‍ुेक्टर‍स्ट्तर‍पर‍ुभी‍्जि गत‍पनु र्नातररत‍ प्लॉटों‍के‍जलए‍ुंबंजधत‍एफएअर।‍ ii) अााुीय, ्ााुाजयक‍और‍पीएुपी‍तथा‍औद्यजजगक‍भूजम‍के‍ईपयजग‍और‍ार्टटकल‍जमलक्ुग प्लॉट‍के‍तूत‍अने‍ााल‍े जाजभन्न‍ईपयजग‍पररुरों‍ूते ु‍लाग‍ू एफएअर‍और‍ऄन्य‍जनयंत्रण, खंड‍ 17.7.5‍में‍जनधावररत‍प्लॉट‍स्ट्तरीय‍जनयंत्रण‍के‍ऄनुुार‍ूोंगे, और‍यू‍ुुजनजित‍दकया‍जाएगा‍दक‍ ुभी‍प्लॉटों‍के‍जलए‍ुंचयी‍क्षत्रे ‍जज‍जनर्नमत‍दकया‍जा‍ुकता‍ू,, ाू‍खंड‍17.1.1‍म‍ें जनधावररत‍ ऄनुमेय‍ुीमा‍ुे‍ऄजधक‍नूीं‍ूज, जुााय‍ईन‍क्षेत्रों‍कज‍छजड़कर‍जूां‍टीडीअर‍का‍ईपयजग‍दकया‍ जा‍रूा‍ू।, iii) ऐुे‍पृथक‍भूजम‍पाुवल,‍जजुका‍अकार‍2‍ूक्े टेयर‍ऄथाा‍आुुे‍ऄजधक‍ू‍, कज ुेक्टर‍के‍लअे ईट‍ प्लान‍म‍ेंिाजमल‍करन‍े के‍जलए‍न्यूनतम‍18‍मीटर‍अरओडब्ल्य‍ूकी‍पुएचं ‍ूजगी। iv) इडब्ल्यूएु‍ब्लॉक‍अाश्यकताओं‍कज‍डीइ‍द्वारा‍्जि गत‍तौर‍पर‍पूरा‍दकया‍जाएगा‍ऄथाा‍एक‍ पृथक‍क्षेत्र/क्षेत्रों‍के‍रूप‍म‍ें ुमेदकत‍अधार‍पर‍ऄजधमानतः पारगमन‍(रांजजट)‍स्ट्टेिनों‍के‍अुपाु‍ जाकजुत‍दकया‍जाएगा। v) खंड‍7.1 के‍ऄनुुार‍ुेक्टर‍म‍ें कम‍ु‍े कम‍15% अााुीय‍एफएअर‍का‍ईपयजग‍40 - 60 ागवमीटर‍के‍छजटे‍अकार‍की‍अााुीय‍आकाआयों‍के‍जाकाु‍के‍जलए‍दकया‍जाएगा। vi) यजजना‍के‍मानदंडों‍के‍ऄनुुार‍ऄथाा‍ग्रुप‍ूाईलुग‍प्लॉटों‍म,ें ऄलग-ऄलग‍प्लॉटों‍के‍रूप‍में‍ स्ट्थानीय‍स्ट्तर‍की‍ुुजाधाएं‍प्रदान‍की‍जाएंगी।‍जूां‍ऐुी‍ुुजाधाएं‍ुमूू‍अााु‍प्लॉटों‍के‍भीतर‍ ू,ैं ाूां: 17.7.4.1 ुुजाधाओं‍ूते ु‍एफएअर‍200‍के‍अााुीय‍एफएअर‍के‍ऄजतररि ‍ूजगा। 17.7.4.2 ‍के‍ऄनुुार‍आु‍तरू‍की‍ुुजाधाओं‍ूते ु‍कजइ‍भी‍अाश्यक‍खुली‍जगू, प्लॉट‍के‍ऄंदर‍प्रदान‍की‍जाएगी।112 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] vii) ुड़क‍लअे ईट क) ुेक्टर‍रजड‍नेटाकव‍यजजना‍के‍ुड़क‍पदानुक्रम‍और‍स्ट्रीट‍जडजाआन‍जाजनयमों‍कज‍िाजमल‍ करेगा।‍ुाआदकल‍चलान‍े और‍पद, ल‍चलने‍की‍ुुजाधाओं‍का‍नटे ाकव‍ऄजनाायव‍अाश्यकता‍ ूजगी। ुभी‍प्रमुख‍ुड़कों‍(24 मीटर‍और‍ईुुे‍ऄजधक)‍कज‍रंक‍ुेााओं‍कज‍ुमायजजजत‍ करने‍के‍जलए‍भूजमगत‍ईपयजजगता‍डक्टु‍‍प्रदान‍की‍जाएंगी। ख) कलेक्टर‍ुड़कों‍के‍तूत‍क्षेत्र‍का‍कम‍ु‍े कम‍50%‍क्षेत्र‍न्यनू तम‍24‍मीटर‍मागावजधकार‍ (अरओडब्ल्यू)‍के‍ुाथ‍जाकजुत‍दकया‍जाएगा। ग) मौजूदा‍राजस्ट्ा‍ुड़कों‍और‍दफरनी‍ुड़कों‍कज, जज‍एक‍ुेक्टर‍के‍भीतर‍प्रमुख‍अााजाूी‍ गजलयारों‍के‍रूप‍म‍ें कायव‍करते‍ूैं, ुुधार‍दकया‍और/ऄथाा‍चौड़ा‍दकया‍जाएगा और‍यदद‍ ुंभा‍ूज‍तज‍ुेक्टर‍लअे ईट‍म‍ेंएकीकृत‍दकया‍जाएगा। घ) 24‍मी‍अरओडब्ल्य‍ू की‍ुड़कों‍पर‍ुीधे‍ााूनों‍के‍प्राेि‍ऄथाा‍पार्ककग‍प्राेि/जनकाु‍ु‍े बचा‍जाएगा, और‍लअे ईट‍के‍जूस्ट्ुे‍के‍रूप‍में‍एक‍ा,कजल्पक‍ााून‍प्राेि‍कज‍जाकजुत‍ दकया‍जाएगा। ङ) नया‍जाकाु‍ऄनुमजददत‍ऄथाा‍जनर्नमत‍यजजनाबद्ध‍जाकाु‍के‍मौजूदा‍गजतजाजध‍नेटाकव‍ के‍ुाथ‍जनरंतरता‍बनाए‍रखेगा। viii) बफरः‍ऄन्य‍ुभी‍ऄजनाायव‍बफर‍अाश्यकताओं‍के‍ऄलााा, कंुजर्टटयम/डीइ‍और‍ुाावजजनक‍ एजेंजुयां, डीुीएन‍के‍ऄनुुार‍प्रमुख‍प्राकृजतक‍नालों‍के‍ुाथ‍बफर‍बनाए‍रखगें े। क) ऐुे‍बफुव‍का‍ईपयजग‍जाजभन्न‍पदानुक्रमों‍के‍पाकों‍कज‍जाकजुत‍करन‍े के‍जलए‍दकया‍ जाएगा, ऄथाा‍दकनारों‍कज‍प,दल‍चलने/ुाआदकल‍चलान‍े ूते ु‍ुड़कें‍प्रदान‍करने‍के‍ ईद‍द् ेश्य‍ुे‍ुरं जक्षत‍दकया‍जाएगा। ख) प्राकृजतक‍नालों‍के‍बफर‍के‍दकनारों‍पर‍जस्ट्थत‍आमारत‍ें बफर‍की‍ओर‍का‍ुामना‍करत‍े ुएए, बाल्कजनयों, जखड़दकयों, प,दल‍प्राेि, फ्रंट-िाप, प्लाजा‍अदद‍के‍रूप‍म‍ें ुदक्रय‍ ऄग्रभाग‍बनाए‍रखेंगी। ix) ुाावजजनक‍प्लाजाः‍ुाावजजनक‍स्ट्थानों‍की‍ईपलब्धता‍कज‍बेूतर‍बनान‍े के‍जलए‍लअे ईट‍म‍ें जाजभन्न‍प,मानों‍के‍ुाावजजनक‍प्लाजा‍िाजमल‍दकए‍जाएंगे।‍प्लाजा‍के‍जाकाु‍कज‍जनम्नानुुार‍ जाजनयजमत‍दकया‍जाएगाः क) न्यूनतम‍2000‍ागवमी.‍के‍ुाावजजनक‍प्लाजा, ुेक्टर‍लेअईट‍प्लान‍के‍जूस्ट्ु‍े के‍रूप‍म‍ें परस्ट्पर‍जड़ु न‍े ााली‍ुड़कों‍के‍ुभी‍प्रमुख‍चौराूों‍पर‍जनयजजजत‍दकए‍जाएंगे। ख) ुभी‍माु‍रांजजट‍स्ट्टेिन‍याजत्रयों‍के‍ऄजधप्लाा‍(जस्ट्लपओार)‍ूते ‍ु और‍मल्टी‍मॉडल‍ आंटीग्रेिन‍के‍जलए‍प्लॉट‍क्षेत्र‍के‍20%‍कज‍एक‍एकल‍खुली‍पुएचं ‍ााले‍ुाावजजनक‍प्लाजा‍के‍ रूप‍म‍ेंप्रदान‍करेंगे। ग) 1‍ूक्े टेयर‍ुे‍उपर‍के‍अकार‍के‍ुभी‍प्लॉटों‍में‍प्लॉट‍क्षेत्र‍के‍10%‍कज‍जमड-स्ट्रीट‍या‍ कॉनवर‍पजब्लक‍प्लाजा‍के‍रूप‍में‍भी‍प्रदान‍दकया‍जाएगा।‍प्लॉटों‍के‍ऄंदर‍ददए‍गए‍ऐु‍े प्लाजा‍के‍तूत‍क्षेत्र‍के‍जलए‍एफएअर, िेी‍प्लॉट‍पर‍लजड‍दकया‍जाएगा। x) ुदक्रय‍फ्रंटेजः क) 24‍मीटर‍अरओडब्ल्यू‍ऄथाा‍ााली‍ुभी‍ुड़कों‍पर‍ुदक्रय‍फ्रंटेज‍का‍ऄनुरक्षण‍दकया‍ जाएगा। ख) भान‍के‍दकनारों‍के‍70% ूते ु‍जबल्ट-टू-एज‍‍जाकाु‍ुजूत‍3‍मी.‍ुेटब,क‍कज‍ूररत‍क्षेत्र‍ और‍ाृक्षारजपण‍के‍ुाथ‍बनाए‍रखा‍जाएगा।‍फ्रंटेज‍का‍कम‍ुे‍कम‍50%‍अकेड्‍ु,[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 113 कजलजनेड्‍ु, िॉप-फ्रन्ट्‍ु, प,दल‍ यात्री‍ प्राेि, प्लाजा‍ अदद‍ का‍ ईपयजग‍ करते‍ ुएए‍ ग्राईंड/पजजडयम‍फ्लजर‍पर‍ुदक्रय‍रखा‍जाएगा। ग) ये‍ऄजनाायवताएं‍केाल‍्ााुाजयक, औद्यजजगक‍और‍पीएुपी‍प्लॉटों‍के‍ुाथ‍ुाथ‍ार्टटकल‍ जमलक्ुग‍प्लॉटों‍पर‍लाग‍ूूोंगी; xi) जस्ट्थरता‍जािेीताएं: क) लैंड‍पूललग‍क्षेत्रों‍के‍भीतर‍ुभी‍पररयजजनाएं‍ऄजनाायव‍0.2‍के‍ग्रीन‍ब्लू‍फ,क्टर‍कज‍ूाजुल‍ करेंगी‍(देखें‍डीुीएन)। ख) ुेक्टर‍‍म‍ेंभौजतक‍ऄाुंरचना‍जनम्नजलजखत‍कज‍ुुजनजित‍करेगीः  िजजधत‍ऄपजिष्ट‍जल‍का‍100%‍िजधन‍एां‍ऄजधकतम‍पुनःईपयजग।  ूररत-ऄपजिष्ट‍कज‍ऄलग‍करना‍और‍100%‍पुनःईपयजग;  ुौर‍उजाव‍ज,ुे‍ऄक्षय‍स्रजतों‍के‍मा्यम‍ुे‍ुेक्टर‍की‍10%‍उजाव‍की‍मांग‍कज‍पूरा‍ करना;‍  लाग‍ू मानदंडों‍के‍ऄनुुार‍ुीध‍े पुनः‍ईपयजग‍और‍भूजल‍पुनभवरण‍ूते ु‍बरुाती‍जल‍ का‍ऄजधकतम‍प्रजतधारण। आन‍जस्ट्थरता‍ुंबंधी‍अाश्यकताओं‍की‍पूर्नत‍ूते ु‍कइ‍क्षेत्र/यजजनाएाँ‍एक‍ुाथ‍लाइ‍जा‍ुकती‍ ू।ैं 17.7.5 प्लॉट‍एां‍भान‍जनयंत्रण i) नीचे‍ददए‍गए‍जाजभन्न‍प्रकार‍के‍प्लॉटों‍के‍जलए‍जनम्नजलजखत‍जनयंत्रण‍लागू‍ूोंगेः जनयत्रं ण अााुीय‍प्लॉट‍-‍प्लारटड‍ अााुीय‍प्लॉट‍ पीएुपी/्ााुाजयक/औद्यजजगक‍ ाीएम‍प्लॉट अााु‍ -‍ुमूू ‍अााु प्लॉट 1 न्यनू तम‍प्लॉट‍ - 5000 ागवमीटर‍न्यूनतम‍ क्षत्रे भूजम‍पर‍केाल‍क्लस्ट्टर‍ जाकाु‍की‍ऄनुमजत* - प्लॉटों‍के‍अकार‍100- 300 ागवमीटर‍के‍बीच‍ जाजभन्न‍ईपयजग‍पररुरों‍के‍ ूोंगे 3000 ागव‍मी. जलए‍यजजना‍के‍मानदंडों‍के‍ 5000 ागव‍मी. - इडब्ल्यूएु‍आकाआयों‍कज‍ ऄनुुार ऄलग-ऄलग‍ब्लॉक‍के‍ रूप‍म,ें क्लस्ट्टर‍के‍भीतर‍ या‍ऄन्य‍डीइ‍के‍ुाथ‍ ुयं ुि ‍रूप‍ुे‍प्रदान‍ दकया‍जाना‍ू , 2 ऄजधकतम‍ दद.मु.यज.‍के‍ऄनुुार, बिते‍ 200 जाजभन्न‍ईपयजग‍पररुरों‍के‍ 400 एफएअर जलए मानदंडों‍के‍ऄनुुार क्लस्ट्टर‍ ूते ु‍ुमग्र‍ एफएअर‍(ऄथावत‍200)‍ुे‍ ऄजधक‍नूीं‍ूज** 3 ऄजधकतम‍ दद.मु.यज.‍के‍ऄनुुार 33%‍तक जाजभन्न‍ईपयजग‍पररुरों‍के‍ 50%‍तक ग्राईंड‍कारेज जलए मानदंडों‍के‍ऄनुुार 4 ऄजनाायव‍ - 18 मी‍और‍ईुुे‍ कम‍ुे‍कम‍एक‍ जाजभन्न‍ईपयजग‍पररुरों‍के‍ - कम‍ुे‍कम‍114 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ुड़क‍पुएचं ऄजधक‍के‍अरओडब्ल्य‍ू तरफ‍18 मी‍ जलए‍यजजना‍के‍मानदंडों‍के‍ एक‍तरफ‍ पर‍ऄनुमेय‍नूीं‍ू , अरओडब्ल्य ू ऄनुुार 24 मीटर‍या‍ - ुमग्र‍क्लस्ट्टर‍के‍पाु‍ ईुुे‍ऄजधक‍ न्यूनतम‍12 मी.‍ुड़क‍ की‍कलेक्टर‍ ुड़क ुे‍पुएचं ‍ूजगी।‍ - 12‍मी.‍ ्जि गत‍प्लॉटों‍कज‍9 अरओडब्ल्य‍ू मी‍ुड़क‍ुे‍पुएचं ‍प्रदान‍ ुे‍ऄजनाायव‍ की‍जा‍ुकती‍ू।, ा,कजल्पक‍ पुएचं 5 ुेटब,क्ु दद.मु.यज.‍के‍ऄनुुार 1. ुंबंजधत‍भूजम‍ईपयजगों‍के‍जाजभन्न‍प्लॉटों‍के‍अकार‍के‍जलए‍ दद.मु.यज.‍के‍ऄनुुार। 2. 24‍मी.‍अरओडब्ल्यू‍और‍ईुुे‍उपर‍के‍प्लॉट‍ूते ु‍फ्रंट‍ुेटब,क‍ खंड‍17.7.4(x)‍के‍ऄनुुार‍ूजगा। 3. ुाआड‍और‍ररयर‍ुेटब,क‍भान‍जनमावण‍ईपजाजध‍/‍एनबीुी‍के‍ ऄनुुार‍ उंचाइ‍ और‍ ाेंरटलेिन‍ की‍ अाश्यकताओं‍ के‍ ऄधीन‍ ूोंगे। *ुभी‍ुुजाधाएं, स्ट्थानीय‍पुएचं ‍माग व और‍ठजु‍ऄपजिष्ट‍तथा‍ऄपजिष्ट‍जल‍प्रबंधन‍ूते ु‍जाकेंद्रीकृत‍ऄाुंरचना, क्लस्ट्टर‍ जाकाु‍के‍ऄंदर‍ुमायजजजत‍की‍जाएंगी। **यदद‍दकुी‍प्लॉट‍के‍जलए‍गणना‍दकया‍गया‍क्षेत्र‍जनम्न‍श्रणे ी‍के‍ऄनुमत‍प्लॉट‍क्षेत्र‍ुे‍कम‍ू,, तज‍जनम्न‍श्रेणी‍के‍ऄजधकतम‍ जनर्नमत‍क्षेत्र‍कज‍ऄनुमजत‍दी‍जाएगी। --- x --- x ---- x --- x --- ऄ्याय कजड 18.0 ूररत‍जाकाु‍क्षत्रे ‍म‍ेंजाकाु DEV2 18.1.1 ूररत‍जाकाु‍क्षेत्र‍(जीडीए) नीजत‍म‍ें ददल्ली‍के‍जनम्नजलजखत‍क्षेत्रों‍में‍जाकाु‍के‍जलए‍एकीकृत‍फ्रेमाकव‍का‍ प्रााधान‍दकया‍गया‍ू:, i) ूररत‍पट्टी-‍राष्ट्रीय‍राजधानी‍क्षेत्र‍ददल्ली‍की‍ुीमा‍के‍ुाथ,‍जूां‍तक‍ुंभा‍ूज, एक‍पररधीय‍राजस्ट्ा‍ग्राम‍ ुीमा‍की‍गूराइ‍तक‍भूजम। ii) कम‍ुघन‍अााुीय‍क्षेत्र‍(एलडीअरए) – गांाों‍का‍ाू‍क्षेत्र‍जजुे‍कम‍घनत्ा‍ााले‍जाकाु‍और‍फामवूाईु‍की‍ बुएलता‍ााल‍े क्षेत्र‍के‍कारण‍‍ऄजधुूजचत‍दकया‍गया‍ूज,‍जजुे‍कम‍घनत्ा‍का‍अााुीय‍प्लॉट‍या‍एलडीअरपी‍ कूा‍जाता‍ू।, 18.1.2 ‍यू‍नीजत‍‘ूररत‍जाकाु’‍कज‍प्रजत्ुाजूत‍करेगी,‍ कम‍एफएअर‍और‍बड़े‍ानीय‍और‍भ-ू दश्ृ य‍ााल‍े क्षेत्र‍जजुकी‍ जािेीता‍ूजगी‍तादकः i) ूररत‍जीान-ि,ली‍और‍मनजरंजन‍के‍जलए‍िूरी‍स्ट्तर‍के‍केंद्रों‍के‍‍जनमावण‍कज‍प्रजत्ुाून‍जमल‍ुके, ग्रीन- जाब्ु‍का‍ुृजन‍और‍ऄथ्व ास्ट्थाओं‍का‍जनमावण‍ूज‍ुके, ii) खाद्य‍और‍ऄन्य‍प्राकृजतक‍ईपज‍के‍भरपूर‍ईत्पादन‍कज‍बढ़ााा‍देना‍तादक‍खाद्य‍ुुरक्षा‍कज‍बेूतर‍बनाया‍जा‍ ुके‍और‍बागाानी‍की‍जरूरतों‍कज‍पूरा‍दकया‍जा‍ुके।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 115 iii) एक‍क्षेत्रीय‍पयावारणीय‍बफर‍बनाना, ाायु‍प्रदीू ण, िूरी‍तापन‍के‍प्रभााों‍कज‍कम‍करना, ाीाव‍का‍ पूाावनुमान‍लगान‍े में‍ुुधार‍लाना‍और‍मरुस्ट्थलीकरण‍के‍खतरे‍का‍मुकाबला‍करना। 18.2 ऄनप्रु यजज्यता 18.2.1 जीडीए‍के‍फ,लाा‍और‍ुीमा‍में‍ूररत‍पट्टी‍और‍एलडीअरए‍के‍रूप‍में‍ऄजधुूजचत‍गांाों‍के‍क्षेत्र‍िाजमल‍ ूोंगे।‍ूालांदक, जीडीए‍का‍फ,लाा‍और‍ुीमा‍जमीन‍पर‍दकए‍गए‍ाास्ट्तजाक‍पररुीमन‍के‍अधार‍पर‍ जभन्न‍ूज‍ुकती‍ू।, 18.2.2 ुभी‍मौजूदा‍और‍भााी‍जाकाु‍कज‍जीडीए‍के‍प्रााधानों‍द्वारा‍िाजुत‍दकया‍जाएगा, जज‍ूररत‍पट्टी‍ और‍एलडीअरए‍के‍जलए‍पूल‍ेके‍प्रााधानों‍कज‍ऄजधक्रजमत‍करेंगे। 18.2.3 यू‍नीजत‍जनम्नजलजखत‍क्षेत्रों‍में‍लाग‍ूनूीं‍ूजगी: i) ऄनजधकृत‍कालजजनयों‍के‍ऄंतगतव ‍भूजम‍(जजन्ू‍ेंऄभी‍जनयजमत‍दकया‍जाना‍ू), ; ii) मुकदमेबाज़ी‍ााली‍भूजम‍जजुमें‍ऄजधग्रूण‍की‍कायवााूी‍ााली‍भूजम‍भी‍िाजमल‍ू,,‍जब‍तक‍ मामले‍का‍जनपटान‍नूीं‍ूज‍जाता; iii) लाल‍डजरा‍क्षेत्रों‍(अबादी)‍म‍ेंजनर्नमत‍भू-खंड, गांाों‍के‍ऄजधुूजचत‍जास्ट्ताररत‍लाल‍डजरा‍क्षेत्र; iv) ऐुी‍भूजम‍जूां‍जीडीए‍जाजनयमों‍की‍ऄजधुूचना‍के‍ुमय,‍दद.जा.प्रा.‍या‍दकुी‍ऄन्य‍ुरकारी‍ एजेंुी‍ने‍ऄनापजि‍प्रमाणपत्र‍(एनओुी)‍जारी‍दकए‍ू‍ैं या‍जूां‍दकुी‍ऄन्य‍ुरकारी‍एजुें ी‍ द्वारा‍यजजना‍कज‍जाकाु‍के‍जलए‍ऄनुमजददत‍दकया‍गया‍ू;, v) ऐुी‍भूजम‍/‍ुंपजि‍जूां‍ुरकार‍या‍दद.जा.प्रा.‍या‍स्ट्थानीय‍जनकायों‍के‍पक्ष‍में‍पररुर‍ु‍े बेदखली‍/‍खाली‍करने‍के‍जलए‍ऄदालत‍का‍अदेि‍जारी‍दकया‍गया‍ू,; vi) ऐुी‍भूजम‍जज‍ुमय-ुमय‍पर‍ुंिजजधत‍प्राचीन‍ुस्ट्ं मारक‍तथा‍पुरातत्ाीय‍स्ट्थल‍और‍ऄािीे ‍ ऄजधजनयम, 1958 के‍प्रााधानों‍के‍ऄतं गतव ‍ुंरजक्षत‍स्ट्मारक/क्षेत्र‍में‍अती‍ू;, vii) ऄजधुूजचत‍ान/ुरकारी‍भूजम‍(ऄजनधावररत‍ईपयजग)‍और‍राष्ट्रीय‍राजधानी‍क्षेत्र‍ददल्ली‍ुरकार‍ की‍दकुी‍भी‍ऄन्य‍यजजना‍के‍ऄंतगतव ‍अने‍ााली‍ऐुी‍भूजम, जजुके‍जलए‍जीडीए‍जाजनयमों‍की‍ ऄजधुूचना‍के‍ुमय‍भ-ू ईपयजग‍में‍पररातवन‍की‍कारवााइ‍ऄजधजनयम‍की‍धारा‍11‍(ए)‍के‍ऄतं गवत‍ प्रदक्रयाधीन‍ू;, viii) पूल‍े ुे‍मौजूद‍ुंस्ट्थान‍जजन्ू‍ें जनयजमतीकरण‍के‍जलए‍मंजूरी‍दी‍गइ‍ू‍, या‍ईन‍पर‍जाचार‍दकया‍ जा‍रूा‍ू‍,या‍ऄभी‍भी‍ुरकार‍द्वारा‍जांच‍की‍जा‍रूी‍ू;, ix) ऄनुमजददत‍और‍ऄजधुूजचत‍बुजनयादी‍ढांचे‍के‍मागावजधकार‍के‍भीतर‍अने‍ााली‍भूजम‍ज,ुे‍दक‍ मौजूदा‍/‍प्रस्ट्ताजात‍ ‍ुड़कें, मुख्य‍रंक‍जल‍अपूर्नत‍और‍ुीाेज‍लाआनें, एचटी‍लाआन,ें परराून‍और‍ऄन्य‍अाश्यक‍बजु नयादी‍ढांचे; x) प्राकृजतक‍नालों, प्राकृजतक‍जलाियों, धरजूर‍स्ट्थलों, बाढ़‍और‍लुचाइ‍जाभाग, रेला‍े और‍ूााइ‍ ऄड्ड‍ेके‍ऄतं गतव ‍भूजम; xi) ऄजधुूजचत‍ान‍भूजम‍या‍क्षेत्रीय‍पाकव‍क्षेत्र‍म‍ें अन‍े ााल‍े फामवूाईु‍(क्षेत्रीय‍पाकव‍में‍जनजी‍ स्ट्ााजमत्ा‍ााली‍भूजम‍पर‍बनाए‍गए‍07.02.2007‍तक‍स्ट्ाीकृत‍फामवूाईु‍कज‍छजड़कर, आु‍ ुंबंध‍में‍भारत‍के‍ईच्चतम‍न्यायालय‍के‍अदेिों‍के‍ऄधीन)। ईपयुवि ‍खण्ड‍(i) और‍(ii) के‍ऄतं गवत‍ुूचीबद्ध‍भूजम‍के‍भूस्ट्ाामी‍भूजम‍ुे‍ुभी‍बाधाओं‍कज‍ूटाने‍के‍बाद‍ ूी‍आु‍नीजत‍के‍ऄंतगवत‍भाग‍ल‍ेुकते‍ू।ैं116 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 18.3 मागदव िकव ‍जुद्धातं 18.3.1 ये‍जुद्धान्त‍ूररत‍जाकाु‍के‍जलए‍प्रस्ट्ताजात‍ईपयजगों/‍कायवकलाप/जमजश्रत‍गजतजाजधयों‍के‍जलए‍ ऄनुमेय‍ईपयजग, कायवकलाप/‍जमजश्रत‍गजतजाजधयों‍और‍एफएअर‍कज‍पररभाजीत‍करन‍े ााले‍एक‍ ्ापक‍ढांचे‍का‍प्रााधान‍करत‍ेू।ैं ‍आन‍ईपयजगों/कायवकलाप‍के‍जमजश्रत‍रूप‍की‍ऄनुमजत‍ूजगी। 18.3.2 भू-स्ट्ााजमयों‍कज‍भूजम‍का‍अर्नथक‍मूल्य‍प्राप्त‍करने‍म‍ें ुमथव‍बनाने‍के‍जलए‍पयावारणीय‍रूप‍ुे‍ुतत‍ जाकाु‍का‍जाकल्प‍देते‍ू।ैं 18.3.3 जीडीए‍के‍भीतर‍और‍अुपाु‍के‍क्षेत्रों‍के‍ाास्ट्तजाक‍और‍प्रकायावत्मक‍एकीकरण‍के‍जलए‍कनेजक्टजाटी‍ और‍बुजनयादी‍ढांचे‍का‍प्रााधान‍करते‍ू।ैं 18.3.4 जीडीए‍के‍भीतर‍ऄनुमत‍गजतजाजधयााँ, जनधावररत‍एफएअर‍और‍ऄजनाायव‍ानीय‍क्षेत्र‍के‍ऄनुुार‍ ूोंगी। 18.3.5 जीडीए‍में‍ूररत‍जाकाु‍के‍तीन‍ग्रेड‍की‍ऄनुमजत‍खडं ‍18.4.1‍के‍ऄनुुार‍दी‍जाएगी। 18.3.6 जीडीए‍के‍भीतर‍भूजम‍का‍जाकाु‍ा,यजि क‍प्लॉटों‍पर‍या‍जाजभन्न‍भूजम‍माजलकों‍द्वारा‍पलू ‍दकए‍गए‍ बड़े‍यजजना‍क्षेत्रों‍पर‍जनजी‍पूल‍के‍मा्यम‍ु‍ेूजगा। 18.3.7 रंक‍आन्फ्रास्ट्रक्चर‍कज‍जनम्नानुुार‍जाकजुत‍दकया‍जाएगा: i) दद.जा.प्रा./ुेाा‍प्रदाता‍एजेंजुयां‍(एुपीए) भूस्ट्ााजमयों‍द्वारा‍बाह्य‍जाकाु‍प्रभार‍(इडीुी) ऄदा‍ दकए‍जाने‍के‍बाद‍बुजनयादी‍ढाचाँ ा‍जाकजुत‍कर‍ुकती‍ू।ैं ii) जनजी‍ुंस्ट्था‍दद.जा.प्रा./ुेाा‍प्रदाता‍एजेंजुयों‍(एुपीए)‍द्वारा‍ऄनुमजददत‍यजजना‍के‍अधार‍पर‍ बुजनयादी‍ढांचे‍का‍जाकाु‍कर‍ुकती‍ू।, 18.4 ऄनप्रु यजज्य‍मानदडं 18.4.1 जाकाु‍के‍जनम्नजलजखत‍ग्रेड‍कज‍ऄनुमजत‍दी‍जाएगी: ताजलका‍18.0:‍जीडीए‍म‍ेंऄनमु त‍जाकाु‍की‍श्रजे णया ं श्रणे ी - 1 श्रणे ी – 2 श्रणे ी - 3 क. ऄनमु ये ता 1. न्यूनतम‍भूजम‍क्षेत्र‍ न्यूनतम‍600‍ाग‍व मी. 4000‍ाग‍वमी. 10,000 ागव‍मी. (1 ूक्े टेयर) 2. न्यूनतम‍पुएचं ‍माग‍व 6‍मी.‍मागावजधकार‍ प्लॉट‍तक‍पुएचाँ ‍12‍मीटर‍ प्लॉट‍तक‍पुएचाँ ‍कम‍ु‍ेकम‍ मागावजधकार ुे‍ूजनी‍चाजूए‍ 30‍मीटर‍मागावजधकार ुे‍ जज‍प्लॉट‍की‍पररजध‍के‍कम‍ुे‍ ूजनी‍चाजूए‍जज‍प्लॉट‍की‍ कम‍15%‍के‍ुमतुल्य‍एक‍ पररजध‍के‍कम‍ुे‍कम‍15%‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 117 जनरंतर‍लंबाइ‍की‍ूज; के‍ुमतुल्य‍एक‍जनरंतर‍ लंबाइ‍की‍ूज; 3. ूररत‍रेरटग* अाश्यक‍नूीं ुमस्ट्त‍यजजना‍ ुमस्ट्त‍ यजजना‍ जीअरअइएचए 3‍या‍ जीअरअइएचए 3‍ या‍ ुमतुल्य‍की‍न्यूनतम‍ूररत‍ ुमकक्ष‍ की‍ न्यूनतम‍ ूररत‍ रेरटग‍का‍ऄनुपालन‍करे रेरटग‍का‍ऄनुपालन‍करे 4. ऄनुमत‍गजतजाजधया ाँ  कृजी, बागाानी, फूलों‍की‍  फामवूाईु  ईच्च‍जिक्षा‍पररुर‍  खुले‍बाजार‍/‍मडं ी‍(ज,ुे‍ (्ााुाजयक‍प्रजिक्षण‍ खेती, ााजनकी दकुानों‍का‍बाजार, ुजूत)  स्ट्मृजत‍ ान,‍ कजब्रस्ट्तान, ूस्ट्तकला‍या‍प्रयुि ‍माल‍  ुाआबर‍और‍ज्ञान‍ईद्यजग, जुमरे ी, और‍श्मिान बाजार) ऄनुुंधान‍और‍जाकाु‍  ‍कंपजलस्ट्टग‍ुुजाधा  जूलॉजजकल‍पाकव‍और‍ ज,ुे‍ग,र-प्रदीू णकारी‍  प्राकृजतक‍ऄपजिष्ट‍जल‍ जचजड़याघर कायव‍केंद्र, िजधन‍ुुजाधा  खेल‍ुुजाधाएाँ  एग्रज‍प्रजुेलुग‍और‍  ुौर‍क्षेत्र‍और‍ऄन्य‍  प्राथजमक‍और‍मा्यजमक‍ प,केलजग, कजल्ड‍स्ट्टजरेज नाीकरणीय‍उजा‍व जिक्षण‍ुुजाधाए ाँ  ग्रीन‍ूाईु ुंस्ट्थापनाए ं  स्ट्ाास्ट््य‍ुुजाधाएं‍(पि‍ु  कन्ाेंिन‍और‍प्रदिनव ी‍ जचदकत्ुा‍ुुजाधाओं‍ केंद्र ुजूत)  कॉन्ुटव‍स्ट्पेु,  ररजॉट्ुव, मजटल‍और‍ स्ट्टेजडयम**, ुांस्ट्कृजतक‍ क्लब  भंडारण‍ुुजाधाएाँ, िजरूम‍ कायवक्रम‍स्ट्थल, और‍मरम्मत‍कायविालाओं‍ ुंग्रूालय, अटव‍गल, री /‍ुेाा‍केंद्रों‍की‍18‍मीटर‍  मनजरंजन‍पाकव‍(ााटर‍ मागावजधकार‍और‍ईुुे‍ पाकव‍कज‍छजड़कर‍जजुे‍ उपर‍कज‍ऄनुमजत‍दी‍ जीडीए‍के‍ऄदं र‍ऄनुमजत‍ जाएगी। नूीं‍दी‍जाएगी)।  ग्रीन‍ूाईु  ग्रेड‍1‍के‍ऄंतगवत‍यथा-  ग्रेड‍1‍के‍ऄंतगवत‍यथा- जनधावररत‍एफएअर‍के‍ जनधावररत‍एफएअर‍‍के‍ ुाथ‍ुभी‍ग्रडे ‍1‍और‍2‍ ईपयजगों‍कज‍ऄनुमजत।‍ ुाथ‍ुभी‍ग्रडे ‍1‍ईपयजगों‍ कज‍ऄनुमजत  पिुपालन  ुामाजजक-ुांस्ट्कृजतक‍ ुुजाधाएाँ118 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ख. जाकाु‍जनयत्रं ण‍मानदडं 1. ऄनुमेय‍एफएअर एफएअर: 5 एफएअर: 20 (ऄजतररि ‍ एफएअर: 60 (ऄजतररि ‍ (दकुी‍भी‍अकार‍की‍भूजम‍ खरीद‍यजग्य 10‍एफएअर‍के‍ खरीद‍यजग्य 20 एफएअर‍के‍ ुाथ) पर‍जनर्नमत‍क्षेत्र‍के‍न्यूनतम ुाथ) 30‍ ाग‍व मीटर‍ और‍ ऄजधकतम‍ 200‍ ाग‍व मीटर‍ पर) 2. ऄजधकतम‍ भूजम‍ 5% 10% 20% कारेज 3. ऄजनााय‍व ानीय‍क्षत्रे अाश्यक‍नूीं‍ प्लॉट‍क्षेत्र‍का‍15% प्लॉट‍क्षेत्र‍का‍45% ‍ 4. ुेटब,क*** ुभी‍ ुाआडों‍ पर‍ 3‍ मीटर‍ 10‍मीटर‍ऄग्र‍ुेटब,क‍और‍ ुभी‍ ुाआडों‍ पर‍ 10‍ मीटर‍ ुेटब,क ुेटब,क ‍ िेी‍पािों‍पर‍5‍मीटर‍ ुेटब,क। आुमें‍खंड‍18.5.1(iv)‍के‍ ऄनुुार‍छूट‍दी‍जा‍ुकती‍ू।, ‍ 5. बेुमेंट‍ ऄनुमजत‍नूीं‍ ऄनुमेय‍एफएअर‍के‍भीतर‍ ऄनुमत‍ एफएअर‍ के‍ भीतर‍ केाल‍जनर्नमत‍ुरं चनाओं‍के‍ केाल‍ जनर्नमत‍ ुंरचनाओं‍ के‍ तूत‍ऄनुमजत‍दी‍गइ‍ू , तूत‍ऄनुमजत‍दी‍गइ‍ू ,  ुतू‍पार्ककग‍के‍जलए‍  ुतू‍पार्ककग‍के‍जलए‍प्लॉट‍  ुतू‍पार्ककग‍के‍जलए‍प्लॉट‍ 6. पार्ककग‍प्रााधान**** प्लॉट‍क्षत्रे ‍का‍5% जूस्ट्ुा‍ क्षत्रे ‍का‍10% जूस्ट्ुा‍रखा‍ क्षत्रे ‍का‍10% जूस्ट्ुा‍रखा‍ रखा‍जाना‍ू‍,(कच्चा‍रखा‍ जाना‍ू‍,(कच्चा‍रखा‍जाना‍ जाना‍ू‍,(कच्चा‍रखा‍जाना‍ जाना‍ू), ू), ू), 7. पक्की‍ुतू  तल‍कारेज‍का‍ईपयजग‍करने‍के‍बाद‍पक्की‍ुतू‍प्लॉट‍क्षेत्र‍की‍5% ुे‍ऄजधक‍नूीं‍ूजगी।  50% क्षत्रे ‍म‍ेंईपयजग‍करन‍े के‍जलए‍जल‍िजीक‍फि‍व ुामग्री। * ग्रेड‍2‍और‍3‍के‍जाकाु‍में‍भी‍दद.जा.प्रा.‍द्वारा‍जनधावररत‍दकुी‍भी‍ऄन्य‍ूररत‍मानदंडों‍का‍पालन‍दकया‍जाएगा। **स्ट्टेजडयमों‍कज‍ऄजधकतम‍एफएअर 40‍की‍ऄनुमजत‍ूजगी। ***राष्ट्रीय‍राजमागों‍के‍ुाथ‍पड़ने‍ााले‍ुभी‍जनमावण‍ढांचे‍एनएचएअइ‍मानदडं ों‍का‍पालन‍करेंगे। **** अयजजनों/ुभाओं‍के‍जलए‍प्रस्ट्ताजात‍प्लॉटों‍के‍मामल‍े कज‍छजड़कर,‍जजुम‍ें स्ट्थानीय‍जनकाय‍की‍नीजत‍के‍ऄनुुार‍ न्यूनतम‍पार्ककग‍अाश्यकताएं‍ूोंगी। 18.4.2 ऄनुकूल‍जमजश्रत‍कायवकलाप‍कज‍ऄनुमजत‍दी‍गइ‍ू‍, बित‍े खंड‍18.4.1 के‍ऄनुुार‍ऄनुमेय‍एफएअर‍और‍ पुएचाँ ‍की‍ित‍ें परू ी‍की‍जाएं।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 119 18.4.3 ुभी‍जाकाु‍जनधावररत‍ूररत‍रेरटग‍का‍ऄनुपालन‍करेंग‍े और‍आन‍मानदंडों‍के‍दकुी‍भी‍ईल्लघं न‍कज‍ दंजडत‍दकया‍जाएगा।‍जीडीए‍की‍ुभी‍यजजनाओं‍कज‍ऄजनाायव‍जीबीएफ‍(जीबीएफ) 0.4‍ूाजुल‍करना‍ ूजगा।‍जनधावररत‍जीबीएफ‍ुे‍ऄजधक‍प्राप्त‍करने‍के‍जलए‍प्रजत्ुाून‍प्रदान‍दकया‍जाए।‍ 18.4.4 ुभी‍ग्रेडों‍के‍तूत‍ग्रीनूाईु,‍ुौर‍क्षेत्र‍और‍ऄन्य‍नाीकरणीय‍उजा‍व ुंस्ट्थापना‍क्षेत्रों‍के‍जनमावण‍की‍ ऄनुमजत‍दी‍जाएगी, बिते‍दक‍आन‍ुंस्ट्थापना‍क्षेत्रों‍के‍ऄंतगवत‍कुल‍क्षेत्र‍प्लॉट‍के‍30%‍ुे‍ऄजधक‍नूीं‍ूज‍ (यथाप्रयजज्य‍ऄजनाायव‍ानीय‍क्षेत्र‍कज‍छजड़कर)। 18.4.5 ऄनुमेय‍एफएअर‍के‍ऄजधकतम‍20%‍का‍ईपयजग‍छजटी‍दकु ानों, रेस्ट्तरां‍या‍कायावलय‍जु, ी‍ुूायक‍ ुुजाधाओं‍के‍जलए‍दकया‍जा‍ुकता‍ू।, ‍(ुंदभव: डीुीएन) 18.4.6 ुभी‍यजजनाओं‍कज‍पाररजस्ट्थजतक‍रूप‍ु‍े अत्मजनभरव ‍आकाआयों‍के‍रूप‍में‍जनम्नानुुार‍जडजाआन‍दकया‍ जाएगा: i) ऄपजिष्ट‍जल का 100%‍जाकेंद्रीकृत‍िजधन‍और‍ऄजधकतम‍पुनः‍ईपयजग।‍ ii) ुभी‍ूररत‍ऄपजिष्ट‍और‍जानारों‍के‍ऄपजिष्ट‍का‍स्ट्थल‍पर‍100%‍प्रुंस्ट्करण। iii) स्ट्थल‍पर‍(ऑन-ुाआट)‍उजाव‍अाश्यकताओं‍के‍30%‍जूस्ट्ुे‍कज‍नाीकरणीय‍उजाव‍ुे‍परू ा‍दकया‍ जाना। iv) भू-दश्ृ य‍ और‍ िूरी‍ जडजाआन‍ के‍ भाग‍ के‍ रूप‍ म‍ें ऄजनाायव‍ ाीाव‍ जल‍ ुंचयन, कच्चे‍ प्राकृजतक‍ (ऄनलाआंड)‍भडं ारण‍तालाबों‍और‍जलाियों‍के‍द्वारा‍ऄजधकतम‍ाीाव-जल‍कज‍स्ट्थल‍पर‍ूी‍रजकना। v) खाद‍बनाने‍और‍पनु ः‍चक्रण‍की‍आन‍ुुजाधाओं‍कज‍ुाझा‍ुुजाधाओं‍के‍रूप‍में‍जाकजुत‍दकया‍जा‍ ुकता‍ू।, 18.4.7 जनम्नजलजखत‍की‍ऄनुमजत‍दी‍जाएगीः i) दकुी‍भी‍प्रजाजष्ट‍या‍प्राेि‍िल्ु क, दकराए‍की‍ईगाूी‍करना; ii) कायावन्ायन‍और‍प्रबंधन‍के‍जलए‍दकराये/पट्टे‍के‍मॉडल‍के‍जलए‍जाकल्प‍का‍जाकल्प;‍ iii) फामवूाईु‍या‍थीम‍फार्ममग‍क्लस्ट्टर अदद‍के‍रूप‍में‍भूजम‍कज‍ईप-जाभाजजत‍करना‍और‍प्लॉट‍की‍ जबक्री‍करना/पट्टे‍पर‍देना; iv) कृजी, ााजनकी‍या‍भूजम‍ुे‍प्राप्त‍ऄन्य‍ईपज‍का‍्ााुाजयक‍रूप‍ुे‍ईपयजग‍करना।‍ 18.4.8 जाकाु‍के‍ग्रेड‍में‍पररातवन‍की‍ऄनुमजत‍ू,, बिते‍खंड‍18.4.1‍के‍ऄनुुार‍ुभी‍ितें‍पूरी‍ूों।‍ऄजनाायव‍ ानीय‍क्षेत्र‍कज‍ग्रडे ‍पररातवन‍के‍ऄनुुार‍बढ़ाया‍जाएगा।‍ूालादं क, दकुी‍भी‍जस्ट्थजत‍म‍ें एक‍जनजित‍ग्रडे ‍ के‍तूत‍ऄनुमजददत‍ूजने‍के‍बाद‍यू‍क्षेत्र‍कम‍नूीं‍दकया‍जाएगा। 18.4.9 दद.जा.प्रा.‍पाररजस्ट्थजतक‍रूप‍ुे‍ुंाेदनिील‍क्षेत्रों‍(ज,ुे‍जनचले‍आलाकों, भूजल‍पुनभवरण‍के‍जलए‍ुंभाजात‍ स्ट्थल, ईच्च‍ाृक्ष‍घनत्ा‍के‍मौजूदा‍क्षेत्र‍अदद)‍की‍पूचान‍करेगा, जूां‍केाल‍ग्रेड‍1‍के‍जाकाु‍की‍ऄनुमजत‍ ूजगी। i) ऐु‍े भू-स्ट्ााजमयों‍कज‍टीडीअर‍के‍रूप‍म‍ें मुअाजा‍ददया‍जाएगा‍जजुका‍ईपयजग‍जचजन्ूत‍प्राजप्त- क्षेत्रों‍के‍भीतर‍दकया‍जा‍ुकता‍ू।, ‍ ii) यदद‍प्लॉट‍का‍एक‍जूस्ट्ुा‍पाररजस्ट्थजतक‍रूप‍ु‍े ुंाेदनिील‍क्षेत्र‍के‍ऄंतगवत‍अता‍ू,, तज‍आुका‍ ईपयजग‍ऄजनाायव‍ानीय‍क्षेत्र‍की‍अाश्यकताओं‍कज‍परू ा‍करने‍के‍जलए‍दकया‍जा‍ुकता‍ू।, ‍िेी‍120 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] प्लॉट‍का‍ईपयजग‍खडं ‍18.4.1‍के‍ऄनुुार‍दकुी‍भी‍ग्रडे ‍की‍‍गजतजाजध‍के‍जलए‍दकया‍जा‍ुकता‍ू।, ‍ ऐुे‍मामलों‍म,ें‍प्रजतपूरक‍टीडीअर केाल‍पाररजस्ट्थजतक‍रूप‍ुे‍ुंाेदनिील‍क्षेत्र‍के‍ऄंतगतव ‍अन‍े ााली‍भूजम‍के‍जलए‍ददया‍जाएगा।‍ iii) ुाावजजनक‍ुभा, अयजजनों‍और‍ुमारजूों‍के‍मानदंड‍ुबं ंजधत‍स्ट्थानीय‍जनकाय‍की‍नीजत‍के‍ ऄनुुार‍ूोंगे। 18.5 फामूव ाईु‍के‍जलए‍जािीे ‍ित ें 18.5.1 फामवूाईु‍के‍जाकाु‍के‍जलए‍जनम्नजलजखत‍ित‍ें परू ी‍की‍जानी‍ूोंगी: i) नए‍फामवूाईु‍कज‍एकल‍(स्ट्टैंडऄलजन)‍प्लॉट‍या‍फामवूाईु‍क्लस्ट्टर‍के‍रूप‍में‍ऄनुमजत‍दी‍जाएगी।‍ न्यूनतम‍12‍मीटर‍मागावजधकार पर‍स्ट्टैंडऄलजन‍प्लॉटों‍की‍ऄनमु जत‍दी‍जाएगी।‍फामवूाईु‍क्लस्ट्टर‍ म,ें अंतररक‍ुड़कें‍9 मीटर‍मागावजधकार की‍ूोंगी, क्लस्ट्टर‍तक‍पुएचं ‍12 मीटर‍मागावजधकार‍ु‍े ूजनी‍चाजूए। ii) 9‍मीटर‍की‍न्यूनतम‍पुएचं ‍ााली‍जनजी‍भूजम‍पर‍जनर्नमत‍मौजूदा‍फामवूाईु‍कज‍(आु‍नीजत‍की‍ ऄजधुूचना‍की‍तारीख‍तक)‍ग्रडे ‍2‍के‍ऄतं गतव ‍जनयजमत‍दकया‍जाएगा।‍ iii) जूां‍मागावजधकार 9‍मीटर‍ुे‍कम‍ू,, ाूां‍ुड़क‍के‍अुपाु‍ुभी‍भूस्ट्ाामी‍पुएचं ‍ुंबंधी‍ितों‍कज‍ पूरा‍करन‍े के‍जलए‍भूजम‍प्रदान‍करेंगे, ूालांदक‍मलू ‍प्लाट‍के‍ऄनुुार‍ऄनुमेय‍एफएअर‍लाग‍ू ूजगा।‍ यदद‍यू‍ुंभा‍नूीं‍ू,, तज‍अपातकालीन‍ााूनों‍की‍ुुगम‍अााजाूी‍ुुजनजित‍करन‍े के‍जलए‍ जनमावण‍ईप-जाजध‍(यूबीबीएल)/अइअरुी‍म‍ें ददए‍गए‍ईपयि ु ‍न्यूनतम‍ुड़क‍ज्याजमजत‍के‍ुाथ‍ न्यूनतम‍6‍मीटर‍मागावजधकार‍प्रदान‍दकया‍जाएगा। iv) मौजूदा‍फामवूाईु‍जज‍ग्रेड‍2‍के‍जाकाु‍के‍जलए‍ुेटब,क‍अाश्यकताओं‍कज‍पूरा‍नूीं‍करत‍े ूैं, ा‍े ऄग्रभाग‍पर‍और‍कम‍ुे‍कम‍5‍मीटर‍के‍दकुी‍एक‍पाि‍वपर‍ुटे ब,क‍प्रदान‍करेंगे। 18.5.2 ुभी‍फामवूाईु‍पर‍जाकाु‍के‍जलए‍ऄन्य‍प्रयजज्य‍मानक: i) फामवूाईु‍प्लॉट‍(चाू‍े स्ट्टैंडऄलजन‍या‍क्लस्ट्टर‍का‍जूस्ट्ुा‍ूज)‍के‍जलए‍जनर्नमत‍ऄजधकतम‍क्षत्रे ,‍ 3000 ागवमीटर‍ुे‍ऄजधक‍नूीं‍ूजगा,‍चाू‍ेप्लॉट‍का‍अकार‍कुछ‍भी‍ूज। ii) जनर्नमत‍ुंरचनाओं‍की‍उंचाइ‍12‍मीटर‍ुे‍ऄजधक‍नूीं‍ूजगी। iii) मौजूदा‍फामवूाईुों‍में‍ऐुे‍बेुमेंट‍जज‍ऄनुमत‍एफएअर‍ुे‍ऄजधक‍ू,ैं ‍कज‍ऄनुमत‍ऄजधकतम‍ ग्राईंड‍कारेज‍के‍ऄपेजक्षत‍जनयजमतीकरण‍िुल्क‍के‍भगु तान‍करने‍पर‍जनयजमत‍दकया‍जाएगा।‍ iv) ऄनुमेय‍एफएअर‍के‍ऄलााा, ुामुदाजयक‍ुेाा‍कर्नमयों‍के‍जलए‍प्रजत‍4000 ागवमीटर‍भूजम‍क्षेत्र‍ पर‍प्रत्येक‍30 ागव‍मीटर‍की‍2 अााु‍आकाआयों‍(प्रजत‍फामवूाईु‍प्लॉट‍पर‍ऐुी‍ऄजधकतम‍5 अााु‍आकाआयां)‍की‍ऄनुमजत‍दी‍जाएगी। v) यूबीबीएल‍के‍ऄनुुार‍चारदीाारी‍ऄथाा‍प्राेि‍द्वार‍के‍जनकट‍ऄजधकतम‍20‍ागव‍मीटर‍की‍ जनगरानी‍गाड‍वआकाइ‍की‍ऄनुमजत‍ूजगी‍जज‍एफएअर‍और‍ुेटब,क‍मानदंडों‍ुे‍मि ु ‍ूजगी‍‍। vi) न्यूनतम‍9‍मीटर‍मागावजधकार‍की‍स्ट्ातंत्र‍पुएचं ‍के‍ुाथ‍4000 ागवमीटर‍ुे‍कम‍के‍प्लॉटों‍का‍ ईप-जाभाजन‍नूीं‍दकया‍जाएगा। 18.6 जीडीए‍म‍ेंबजु नयादी‍ढाचं ‍ेऔर‍कनजे क्टजाटी‍की‍्ास्ट्था[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 121 18.6.1 दद.जा.प्रा.,‍ुेाा‍प्रदाता‍एजेंजुयों‍(SPA)‍के‍ुाथ‍ुमन्ाय‍करके‍जीअइएु‍अधाररत‍एकीकृत‍जीडीए‍ यजजना‍(अइजीपी)‍त,यार‍करेगा।‍अइजीपी‍जनम्नजलजखत‍जनदेिों‍ााली एक‍स्ट्रक्चर‍यजजना‍ूजगी‍ (जजुमें‍कजइ‍पूा-व जनधावररत‍भूजम‍ईपयजग‍नूीं‍ू), : i) छजड़े‍गए‍क्षेत्र‍(ज,ुा‍दक‍आु‍नीजत‍के‍जाजनयमों‍में‍ददया‍गया‍ू), ; ii) पाररजस्ट्थजतकी‍ुंाेदनिील‍क्षेत्र; iii) मुख्य‍पुएचं ‍ुड़कें‍जज‍जीडीए‍तक‍कनेजक्टजाटी‍मुूय, ा‍करेंगी।‍आुमें‍ुभी‍ , क्षेत्रीय‍ यजजना‍ुड़कें‍और‍कजइ‍भी‍स्ट्थानीय‍या‍राजस्ट्ा‍ुड़कें‍िाजमल‍ूोंगी।‍ 18.6.2 ूररत‍जाकाु‍क्षेत्र‍ु‍े गुजरन‍े ााली‍ ‍और‍क्षेत्रीय‍यजजना‍ुड़कों‍के‍ुरं ेखण‍का‍पालन‍दकया‍ जाएगा।‍ 18.6.3 जीडीए‍ु‍े कनेजक्टजाटी‍ुुजनजित‍करन‍े के‍जलए‍ुंबंजधत‍प्राजधकरणों‍द्वारा‍क्षेत्रीय‍ुड़कों‍का‍जाकाु‍ दकया‍जाएगा।‍ऐुी‍ुड़कों‍के‍जलए‍भूजम‍की‍अाश्यकता‍कज‍पूललग‍प्रदक्रया‍के‍मा्यम‍ु‍े पूरा‍दकया‍ जाएगा‍ज,ुा‍दक‍जीडीए‍जाजनयमों‍में‍जास्ट्तृत‍रूप‍ुे‍बताया‍गया‍ू‍, और‍आुके‍जलए‍टीडीअर‍ज,ु‍े ईपयुि ‍प्रजत्ुाून‍प्रदान‍दकए‍जा‍ुकते‍ू।ैं 18.6.4 भूस्ट्ाामी‍स्ट्थानीय‍जरूरतों‍के‍ऄनुुार‍ुामाजजक‍बुजनयादी‍ढांचे‍और‍ईपयजजगताओं‍ज,ुे‍पुजलु‍स्ट्टेिन, फायर‍स्ट्टेिन, फ्यूल‍स्ट्टेिन, ुब-स्ट्टेिन, टेलीकॉम‍टॉार‍अदद‍के‍जलए‍भूजम‍प्रदान‍करेंगे।‍जािेी‍ुुजाधा‍ के‍जलए‍जनर्ददष्ट‍मानदंडों,‍जजनमें‍ुड़क‍तक‍पुएचाँ ‍की‍ितें, ुेटब,क‍अदद‍िाजमल‍ू,ैं‍का‍पालन‍करन‍े की‍ अाश्यकता‍ू।, ‍ऐुी‍ुभी‍ुुजाधाओं‍कज‍ ‍में‍दी‍गइ‍ऄनुमजत‍के‍ऄनुुार‍और‍ऄजधुूजचत‍ जीडीए‍जाजनयमों‍के‍ऄनुुार‍जीडीए‍में‍जस्ट्थत‍दकुी‍भी‍भूजम‍पर‍जाकजुत‍दकया‍जा‍ुकता‍ू।, 18.6.5 पानी, जाद्युत‍और‍दरू ुंचार‍के‍जलए‍रंक‍ऄाुंरचना‍का‍जनमावण‍आु‍नीजत‍के‍जाजनयमों‍के‍ऄनुुार‍ ूजगा। --- x --- x ---- x --- x --- ऄ्याय कजड 19.0 िूरी‍पनु रूद्धार DEV3 19.1.1 ददल्ली‍म‍ें ाीव‍1940 ुे‍1970 के‍बीच‍बड़ी‍ुंख्या‍म‍ें क्षेत्रों‍का‍जाकाु‍ुएअ, जजुके‍पररणामस्ट्ारूप‍यूां‍परु ानी‍ जनर्नमत‍ुंरचनाओं‍का‍एक‍स्ट्टॉक‍बना‍ुएअ‍ू।, ‍आनम‍ें ुे‍कइ‍क्षेत्र‍जीणव-िीणव‍ऄास्ट्था‍म‍ें ू,ैं जजन्ू‍ें पुनरूद्धार‍की‍ अाश्यकता‍ ू‍, और‍ आनका‍ आष्टतम‍ ईपयजग‍ दकया‍ जा‍ ुकता‍ ू,।‍ आन‍ क्षेत्रों‍ की‍ ऄलग-ऄलग‍ जािेीताए,ं अाश्यकताए,ं क्षमताएं‍और‍बाधाएं‍ू,ैं जज‍पूरे‍िूर‍भर‍म‍ें पुनरूद्धार‍के‍जलए‍एक‍ुूक्ष्म‍ा‍ुटीक‍रणनीजत‍की‍ जरूरत‍पर‍बल‍देती‍ू।ैं 19.1.2 ‍आु‍कायनव ीजत‍का‍ईद्देश्य‍परु ाने‍और‍ऄुुरजक्षत‍आमारतों‍के‍स्ट्टॉक‍कज‍नाीनीकृत‍करने‍और‍आन‍क्षेत्रों‍में‍रून‍े और‍ काम‍करने‍ााले‍लजगों‍के‍जीान‍की‍गुणािा‍में‍ुुधार‍के‍जलए‍जनयजजन‍और‍जडजाआन‍ईपकरण‍के‍रूप‍म‍ें पुनरूद्धार‍का‍ईपयजग‍करना‍ू।, ‍यू‍ईनकी‍ऄंतर्ननजूत‍क्षमता‍कज‍प्रकट‍करत‍े ुएए, भौजतक‍और‍ुामाजजक‍122 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] बुजनयादी‍ ढांचे‍ के‍ प्रााधान‍ के‍ ुाथ, ऐजतूाजुक‍ और‍ ुांस्ट्कृजतक‍ रूप‍ ुे‍ मूत्ापूणव‍ क्षेत्रों‍ के‍ पुनरुद्धार, ुाावजजनक‍क्षत्रे ‍का‍ुंाधवन‍तथा‍चुलनदा‍क्षेत्रों‍में‍कायनव ीजतक‍जाकाु‍की‍ुुजाधा‍भी‍प्रदान‍करेगा। 19.2 मागदव िकव ‍जुद्धातं 19.2.1 ‍‍जनयजजजत‍अााुीय‍परराेि‍और‍अर्नथक‍केंद्रों‍ु‍े लेकर‍घन‍े ऄजनयजजजत‍क्षेत्रों‍तक‍जाजभन्न‍ुंदभों‍पर‍ ्यान‍देन‍े के‍जलए‍ुक्ष्ू म‍ुरं चना। 19.2.2 ‍‍दकुी‍क्षेत्र‍के‍पुनरूद्धार‍के‍जलए‍ुाधनों‍के‍जमश्रण‍का‍ईपयजग‍करन‍े के‍जाकल्प‍के‍ुाथ‍लचीली‍ुरं चना‍ ऄथावत्‍रेरजदफरटग, पुनर्ननमावण‍ऄथाा‍पूण/वअंजिक‍पुनर्नाकाु,‍बिते‍दक ुंरचनात्मक‍ुुरक्षा, ुतत‍ ुेााएं, और‍चलने‍की‍बेूतर‍ुुजाधा‍की‍अाश्यकताओं‍कज‍पूरा‍दकया‍गया‍ूज।‍मौजूदा‍ऄच्छी‍ गुणािा‍के‍जनर्नमत‍स्ट्टॉक‍का‍पनु ःईपयजग‍जनमाणव ‍के‍जलए‍एक‍स्ट्थायी‍ुकुवलर‍आकजनजमी‍दजृष्टकजण‍ू।, 19.2.3 ‍‍पनु रूद्धार‍ूते ‍ु एकीकृत‍ुरंचना‍जज‍एकीकृत‍यजजना‍कज‍प्राप्त‍करने‍के‍जलए, ऄच्छी‍तरू‍ु‍े अनुपाजतक‍ खुले‍स्ट्थानों‍का‍जनमावण‍करन,े ुड़क‍नेटाकव‍में‍ुुधार‍करन,े प,दल‍चलन‍े यजग्य‍और‍ुतत‍स्ट्थल‍ जडज़ाआन‍के‍जलए‍प्लॉटों‍के‍ुमामेलन‍और‍पनु गवठन‍की‍ऄनुमजत‍देता‍ू।, 19.2.4 ‍‍ुााजव जनक‍पररणामों‍ु‍े जड़ु ी‍प्रजत्ुाूनात्मक‍ुरं चना‍जज‍आु‍ित‍व पर‍ईच्च‍एफएअर‍या‍छूटप्रद‍ मानदंड/िुल्क‍ज,ुे‍प्रजत्ुाून‍प्रदान‍करता‍ू‍, दक‍पररयजजना‍ुाावजजनक‍ईद्देश्य‍कज‍पूरा‍करेगी, ईदाूरण‍के‍जलए‍नए‍ुाावजजनक‍स्ट्थान‍और‍पाकव‍का‍जनमावण, ुतत‍जाकाु‍अदद। 19.2.5 ‍‍िूर‍के‍ईच्च‍ुंभाजात‍क्षेत्रों‍के‍मूल्य‍कज‍ईजागर‍करन‍े और‍ईच्चतर‍एफ.ए.अर.,‍घनत्ा‍और‍पजब्लक‍ रांजजट‍नजड्ु‍तथा‍नेटाकव‍के‍ुमीप‍केंदद्रत‍जमजश्रत‍ईपयजगों‍के‍ुाथ‍दीघवकाजलक‍(25-30‍ाी)व ‍ ऄाजध‍में‍बेूतर‍िूरी‍रूप‍कज‍प्राप्त‍करन‍े ूते ‍ु और‍कायनव ीजतक‍केंद्रों‍के‍जाकाु‍की‍ुुजाधा‍प्रदान‍ करना। 19.3 ऄनप्रु यजज्यता 19.3.1 ‍‍यू‍नीजत‍जनम्नजलजखत‍कज‍छजड़कर‍ुभी‍मौजूदा‍जाकजुत‍क्षत्रे ों‍पर‍लाग‍ूूजगीः i) प्राकृजतक‍ूररत‍क्षेत्र‍और‍जलािय, नाले‍और‍बफर‍तथा‍पयााव रणीय‍ुंरक्षण‍के‍जलए‍पूचाने‍गए‍ दकुी‍भी‍ऄन्य‍क्षेत्रों‍के‍ऄंतगवत‍अने‍ााले‍क्षेत्र। ii) जजन‍‘ओ’ iii) ूररत‍जाकाु‍क्षत्रे iv) लैंड‍पूललग‍क्षत्रे v) टीओडी नजड्ु vi) स्ट्मारक‍जनजीद्ध‍क्षेत्र‍एां‍ऄजधुूजचत‍जाराुत‍स्ट्थल/प्लॉट vii) जुजाल‍लाआंु‍बंगला‍क्षेत्र‍(ईिरी‍ददल्ली‍नगर‍जनगम‍और‍दद.जा.प्रा.‍के‍लेअईट‍प्लान‍के‍ ऄनुुार) viii) लुरटयन्ु‍बंगलज‍जजन‍(एनडीएमुी,‍एलएडं डीओ‍की‍लअे ईट‍यजजनाओं‍के‍ऄनुुार) ix) दतू ाााु‍/‍जडप्लजम,रटक‍एन्क्लाे ‍/‍जादेिी‍जमिन 19.3.2 ‍यजजना‍की‍ऄजधुूचना‍के‍6‍मूीने‍के‍भीतर‍पुनरूद्धार‍के‍जलए‍जाजनयम‍त,यार‍और‍ऄजधुूजचत‍दकए‍ जाएंगे।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 123 19.4 प्लॉट‍स्ट्तर‍पर‍पनु र्ननमाणव 19.4.1 ‍ददल्ली‍म,ें जाराुत‍भानों‍और‍ऄा,ध‍ुरं चनाओं‍कज‍छजड़कर‍ुभी‍आमारतों‍कज‍लागू‍जाकाु‍जनयंत्रण‍ मानदंडों‍के‍ऄनुुार‍एकल‍प्लॉट‍स्ट्तर‍के‍पुनर्ननमावण‍की‍ऄनुमजत‍ू।, ‍रीजेनरेिन‍एफएअर‍भूखंड‍स्ट्तर‍ पर‍ऄनुमत‍नूीं‍ूजगा‍पुनर्ननमाणव ‍केाल‍ईन‍भूखंडों‍के‍जलए‍ईपलब्ध‍ूजगा‍जज‍आु‍नीजत‍की‍ितों‍कज‍ पूरा‍करते‍ू‍ैं(खंड‍19.5‍के‍ऄनुु ार‍रीजेनरेिन‍यजजना‍की‍त,यारी‍ुजूत)। 19.4.2 ‍जनम्नजलजखत‍प्रााधानों‍के‍ऄनुु ार‍प्लॉट‍स्ट्तर‍पर‍केाल‍जनम्नजलजखत‍टाआपजलॉजी‍कज‍पनु र्ननमावण‍ऄथाा‍ परराधवन/पररातवन‍की‍ऄनुमजत‍दी‍जाएगीः 19.4.2.1 प्लॉरटड‍अााुीय‍जाकाु कज‍दद.म.ुयज.‍के‍ऄनुुार‍प्लॉरटड‍अााु‍ूते ु‍प्रचजलत‍एफएअर‍का‍ ईपयजग‍करके‍एकल‍प्लॉट‍स्ट्तर‍के‍पुनर्ननमावण‍की‍ऄनुमजत‍दी‍जाएगी। i) छजटे‍अकार‍के‍प्लॉटों‍कज‍केाल‍64‍ागवमीटर‍तक‍के‍क्षेत्र‍में‍ुमामेजलत‍दकया‍जा‍ ुकता‍ू।, 19.4.2.2 जमजश्रत‍ईपयजग‍स्ट्रीट/्ााुाजयक‍स्ट्रीट: अााुीय‍जाकाु‍के‍मानदंडों‍के‍ऄनुुार‍प्लॉट- स्ट्तर‍के‍पनु र्ननमावण‍की‍ऄनुमजत‍ूजगी। i) ुड़क‍के‍ुाथ‍प्लॉटों‍की‍एक‍पंजि ‍के‍र,जखक‍ुमामेलन‍की‍ऄनुमजत‍ूजगी, बित‍े दक‍एकल‍प्लॉट‍500 ागव‍मीटर‍क्षेत्रफल‍के‍ूों।‍मागव‍के‍ुाथ‍लगातार‍क्रमबद्ध‍ ुदक्रय‍फ्रंट,ज‍कज‍बनाए‍रखा‍जाएगा।‍आु‍तरू‍की‍यजजनाएं‍प्लॉट‍के‍भीतर‍ पार्ककग‍अाश्यकताओं‍की‍पूर्नत‍करेंगी। ii) ऄनुमत‍एफएअर‍में‍ुे‍10%‍ऄजतररि ‍एफएअर‍स्ट्ट,क‍पार्ककग‍के‍जलए‍प्रदान‍ दकया‍जाएगा। 19.4.2.3 गर, -पदानक्रु जमक‍ ्ााुाजयक‍ केंद्र/नाजमत‍ ुीुी/नाजमत‍ एलएुुी/नाजमत‍ ुीएुुी/दकु ान-एा-ं जनााु‍भखू डं ः‍कज‍ऄनुमये ‍प्लॉरटड‍अााुीय‍एफएअर‍के‍ऄनुुार‍ प्लॉट-स्ट्तर‍के‍पुनर्ननमावण‍की‍ऄनुमजत‍दी‍जाएगी। i) ऄनुमेय‍ग्राईंड‍कारेज‍मौजूदा‍ुंरचना‍के‍फुटलप्रट, ुकुवलेिन‍स्ट्पेु‍और‍खुल‍े स्ट्थल‍ के‍ऄनुुार‍ूजगा। ii) ुाझा‍दीाारों‍ााली‍दकु ानों‍म,ें ुंपजि‍के‍माजलक‍परस्ट्पर‍ुूमत‍ूज‍ुकते‍ू‍ैं और‍ ब्लॉक‍ऄथाा‍ुड़क‍स्ट्तर‍पर‍पनु र्ननमावण‍कर‍ुकते‍ू।ैं iii) ऄजधकतम‍दज‍परस्ट्पर‍जुड़े‍प्लॉटों‍/‍ुंपजियों‍कज‍ुमामेजलत‍दकया‍जा‍ुकता‍ू।, 19.4.2.4 िाूजूानं ाबाद‍म‍ें गर, -जाराुत‍भानों‍ााल‍े प्लॉटों‍कज‍प्लॉट‍स्ट्तर‍के‍पुनर्ननमावण‍की‍ ऄनुमजत‍जनम्नजलजखत‍ितों‍के‍ऄनुुार‍प्रदान‍की‍जाएगीः i) परंपरागत‍ ुमरूपता‍ और‍ गजलयों‍ के‍ जान्याु‍ कज‍ ुंरजक्षत‍ दकया‍ जाएगा।‍ पुनुंरचना‍के‍बगर, ‍मौजूदा‍प्रचलन‍पद्धजत‍म‍ेंुुधार‍दकया‍जाना‍चाजूए। ii) अााुीय‍प्लॉट‍अााु‍के‍जलए‍मानदडं ों‍के‍ऄनुुार‍प्लॉट‍एफएअर‍के‍जलए‍पात्र‍ ूोंगे‍और‍ऄजधकतम‍ऄनुमेय‍उंचाइ‍12‍मी.‍ूजगी।‍प्लॉट‍जज‍ऄनुमेय‍एफएअर‍का‍ ईपयजग‍करने‍म‍ेंऄुमथ‍वू,ैं ाे‍टीडीअर‍के‍जलए‍पात्र‍ूोंगे। iii) प्लॉट‍स्ट्तर‍पर‍मौजूदा‍बेुमेंट‍भंडारण‍के‍जलए‍ईपयजग‍दकया‍जा‍ुकता‍ू।, ‍दकुी‍ भी‍भान‍में‍दकुी‍नए‍बेुमेंट‍की‍ऄनुमजत‍नूीं‍दी‍जाएगी।‍124 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] iv) ऄनुमेय‍ग्राईंड‍कारेज‍मौजूदा‍कारेज‍के‍ुमान‍ूजगा। v) जबल्ट-टू-एज‍फ्रंटेज‍कज‍पुएचं ‍ुड़कों‍के‍ुाथ‍बनाए‍रखा‍जाएगा‍और‍चारदीाारी‍ िूर‍जाराुत‍(ााल्ड‍जुटी‍ूरे रटेज)‍जजन‍म‍ें दकुी‍जस्ट्टल्ट‍की‍ऄनुमजत‍नूीं‍दी‍ जाएगी। vi) ऄजनाायव‍इुीएु‍मानदडं ‍चारदीाारी‍िूर‍जाराुत‍क्षेत्र‍में‍लाग‍ू नूीं‍ूोंग,े और‍ केाल‍जनााजुयों‍कज‍ऄल्पतम‍पार्ककग‍की‍ऄनुमजत‍दी‍जाएगी। vii) ग,र-जाराुत‍ुंरचनाओं‍ााल‍े ऄजधकतम‍2‍प्लॉटों‍कज‍ूी‍ुमामेलन‍की‍ऄनुमजत‍ ूजगी। viii) भूतल‍पर‍स्ट्थानीय‍स्ट्तर‍की‍्ााुाजयक‍गजतजाजधयों‍की‍ऄनुमजत‍ूजगी।‍पूरे‍ भान‍ में‍ खुदरा, गेस्ट्ट‍ ूाईु, बजर्मडग‍ और‍ लॉलजग, ुामाजजक-ुांस्ट्कृजतक‍ ुुजाधाएं, मरम्मत‍की‍दकु ान,ें रेस्ट्तरां‍अदद‍की‍ऄनुमजत‍दी‍जाएगी, यदद‍न्यूनतम‍ 6 मीटर‍ुड़क‍ुे‍पुएचाँ ‍ईपलब्ध‍ू।, ix) ुामाजजक‍ुुजाधाओं‍ूते ु‍मानदडं ‍खंड‍19.10.4.2‍के‍ऄनुुार‍ूोंगे। x) ऐुे‍दकुी‍भी‍बाूर‍की‍तरफ‍ईभार/छज्जे/बाल्कनी‍कज‍ऄनुमजत‍नूीं‍दी‍जाएगी‍ जज‍6मी‍चौड़ाइ‍ुे‍कम‍की‍ुड़क‍की‍तरफ‍खुलते‍ूों। 19.4.2.5 जाजिष्ट‍भान‍और‍िूरी‍जडजाआन‍जनयत्रं णों‍के‍ुाथ‍एकीकृत‍रीजने रेिन‍यजजनाए‍ं करजल‍ बाग‍म‍ें जािीे ‍क्षत्रे ों, चारदीाारी‍िूर‍के‍बाूर‍के‍क्षत्रे ‍और‍प्राजधकरण‍द्वारा‍ुमय-ुमय‍पर‍ पूचान‍े गए‍दकुी‍भी‍ऄन्य‍क्षत्रे ों‍के‍जलए‍मामला‍दर‍मामला‍अधार‍पर‍जाकजुत‍की‍ जाएगं ी। 19.4.2.6 जजे ‍ेपनु स्ट्थापव न‍कॉलजजनया‍ाँ: i) प्लॉट‍स्ट्तर‍के‍पुनर्ननमावण‍ूते ‍ु ऄजधकतम‍64‍ागव‍मीटर‍तक‍की‍ऄनुमजत‍प्लॉट‍के‍ ुमामेलन‍के‍ुाथ‍दी‍जाएगी। ii) झुग्गी‍पुनस्ट्थावपन‍के‍मानदडं ों‍के‍ऄनुुार‍एक‍जे.ज.े‍पुनस्ट्थापव न‍कॉलजनी‍के‍तूत‍ पूरे‍क्षेत्र‍के‍जलए‍पनु रूद्धार‍यजजना‍की‍ऄनुमजत‍दी‍जाएगी। 19.5 पनु रूद्धार‍यजजनाए ं 19.5.1 ‍‍्ापक‍जनयजजन‍के‍जलए‍बड़े‍क्षेत्र‍कज‍कार‍करन‍े ााली‍पुनरूद्धार‍यजजनाए‍ं (अरपी)‍त,यार‍की‍जाएगं ी।‍आुके‍ ईपरान्त, एकल‍या‍एकाजधक‍प्लॉटों‍के‍जलए‍ऄलग-ऄलग‍पनु रूद्धार‍यजजनाएं‍त,यार‍और‍कायावजन्ात‍की‍ जाएंगी। 19.5.2 ‍‍पनु रूद्धार‍यजजनाएं, पुएचं ‍और‍ुकुवलेिन‍प्रदान‍करन‍े के‍जलए, लगभग‍500‍मी.‍ुी/ुी‍की‍दर‍ुे‍18-24‍मी.‍ ुड़कों‍के‍ुाावजजनक‍रजड‍जग्रड/नेटाकव‍का‍जनधारव ण‍करेंगी।‍पुनरूद्धार‍यजजनाओं‍म‍ें ऄजतररि ‍ढांचागत‍ ुुजाधाएं‍प्रदान‍की‍जाएंगी। 19.5.3 ‍‍पनु रूद्धार‍यजजनाओं‍कज‍दद.जा.प्रा.‍ऄथाा‍दकुी‍जाकाुकिाव‍ुंस्ट्था‍(डीइ)‍द्वारा‍त,यार‍दकया‍जा‍ुकता‍ू‍, जज‍ पुनरूद्धार‍यजजनाओं‍कज‍ूाथ‍में‍लने े‍के‍जलए‍आच्छुक‍ूज।‍डीइ‍द्वारा‍आु‍प्रकार‍त,यार‍पुनरूद्धार‍यजजनाओं‍कज‍ दद.जा.प्रा.‍ऄथाा‍स्ट्थानीय‍जनकाय‍कज‍ऄनुमजदन‍ूते ु‍प्रस्ट्ततु ‍दकया‍जाएगा,‍जजुके‍ऄजधकार‍क्षेत्र‍में‍ाू‍क्षत्रे ‍ अता‍ू।, ‍डीइ‍दकुी‍जािेी‍क्षत्रे ‍जूां‍एक‍ुे‍ऄजधक‍पनु रूद्धार‍यजजनाओं‍की‍पूचान‍की‍गइ‍ू,, ‍के‍जलए‍ पुनरूद्धार‍यजजनाएं‍त,यार‍करन‍े ूते ु‍दद.जा.प्रा.‍ुे‍भी‍ुंपकव‍कर‍ुकते‍ू।ैं[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 125 19.5.4 ‍‍पनु रूद्धार‍यजजनाओं‍कज‍न्यूनतम‍4‍ूक्े टेयर‍के‍क्षेत्र‍के‍जलए‍ऄथाा‍ऐुे‍दकुी‍क्षेत्र‍के‍जलए‍ऄनुमजददत‍दकया‍जा‍ ुकता‍ू‍,जजुकी‍ुुस्ट्पष्ट‍‍चारदीाारी‍ूज। 19.5.4.1 दकुी‍मौजूदा‍स्ट्ाीकृत‍लेअईट‍यजजना‍की‍पुनरूद्धार‍यजजना‍ऄथाा‍दकुी‍पॉकेट/ब्लॉक/ऄन्य‍ुब- जडाीजन‍जजुमें‍ुुस्ट्पष्ट‍ुीमाएं‍ू,ैं पर‍जाचार‍दकया‍जाएगा।‍एक‍लम्बे‍छजर‍के‍ुाथ‍न्यनू तम‍18 मीटर‍मागावजधकार‍ु‍े ुीधी‍पुएचं ‍आुके‍जलए‍ऄजनाायव‍ू।, ‍ईदाूरण‍के‍जलए‍एक‍ग्रपू ‍ूाईलुग‍ कॉलजनी‍में‍कजइ‍पॉकेट‍या‍ुेक्टर ऄथाा‍दकुी‍औद्यजजगक‍लअे ईट‍का‍एक‍ुब-जडाीजन। 19.5.4.2 एलएुुी, ुीुी, डीुी‍और‍एकीकृत‍कायावलय‍पररुर‍के‍जलए‍पुनरूद्धार‍यजजनाओं‍कज‍पूरे‍ ऄनुमजददत‍लअे ईट‍के‍जलए‍त,यार‍दकया‍जाएगा। 19.5.5 ‍‍पनु रूद्धार‍यजजनाओं‍के‍ऄनुमजदन‍पर, अरपी‍के‍भीतर‍छजटे‍क्षेत्र‍जनम्नजलजखत‍अाश्यकताओं‍कज‍परू ा‍करन‍े के‍ बाद, एकल‍पुनरूद्धार‍यजजनाओं‍ूते ‍ु प्रस्ट्ताा‍प्रस्ट्तुत‍कर‍ुकत‍े ू:ैं 19.5.5.1 न्यूनतम‍जनधावररत‍पुएचं ‍ितों‍कज‍पूरा‍दकया‍जाता‍ू।, 19.5.5.2 पुनरूद्धार‍यजजनाओं‍कज‍खाली‍भूजम‍पर‍ऄनुमजत‍नूीं‍दी‍जाएगी।‍यजजना‍क्षेत्र‍पर‍कम‍ु‍े कम‍50%‍ ुंचयी‍एफएअर‍(जनमाणव ‍के‍ुमय‍ऄनुमेय)‍पुनरूद्धार‍ूते ‍ु यजजना‍प्रस्ट्तुत‍करत‍े ुमय‍जनर्नमत‍दकया‍ जाना‍चाजूए।‍यू‍ितव‍कायनव ीजतक‍क्षेत्रों‍ऄथावत‍टीओडी‍स्ट्कीमों, ्ाुाय‍ुंाधवन‍जजलों‍ऄथाा‍ यजजना‍द्वारा‍ऄजधुूजचत‍दकुी‍ऄन्य‍कायनव ीजतक‍क्षेत्र‍पर‍लाग‍ूनूीं‍ूजगी। 19.5.6 ‍‍ुड़कों‍और‍ुाावजजनक‍ुुजाधाओं‍कज‍ऄनुमजददत‍पुनरूद्धार‍यजजनाओं‍के‍ऄनुुार‍ुभी‍पनु रूद्धार‍यजजनाओं‍म‍ें प्रदान‍दकया‍जाएगा। 19.6 जनयजजजत‍लअे ईट‍म‍ेंपनु रूद्धार‍यजजनाओं‍ूते ‍ुमानदडं 19.6.1 ‍‍पनु रूद्धार‍यजजनाओं‍में‍न्यूनतम‍18‍मी.‍मागावजधकार‍ुड़क‍ु‍े पुएचाँ ‍ूजगी।‍ईुी‍ुकल‍भूजम‍ईपयजग‍ााल‍े प्लॉटों‍के‍जलए‍ूी‍ुमामेलन‍की‍ऄनुमजत‍ूजगी।‍परू ी‍यजजना‍क्षेत्र‍के‍जलए‍प्लॉटों‍का‍पनु गवठन‍दकया‍जा‍ुकता‍ ू।, 19.6.1.1 खंड‍19.2.2‍के‍ऄनुुार‍ुभी‍यजजनाओं‍कज‍पनु रूद्धार‍ूते ‍ु कायनव ीजतयों‍के‍जमश्रण‍का‍ईपयजग‍ करने‍की‍ऄनुमजत‍ूजगी। 19.6.1.2 ुाावजजनक‍क्षेत्र, ज,ुे‍ुड़कें, खुली‍जगू, नाले‍अदद‍कज‍एकीकृत‍यजजना‍के‍जलए‍िाजमल‍दकया‍जा‍ ुकता‍ू,, बिते‍दक‍ुाावजजनक‍ुड़कें‍18‍मी.‍मागावजधकार‍ु‍े कम‍ूों, और‍5‍मी.‍ुे‍कम‍चौड़ाइ‍ ााले‍ुाावजजनक‍नाले‍ूों, और‍ुाावजजनक‍पाकव‍‘टॉट-लॉट्ु' ुे‍बड़े‍अकार‍के‍नूीं‍ूों‍और‍आुु‍े अुपाु‍के‍प्लॉटों‍तक‍पुएचं ‍में‍कजइ‍बाधा‍नूीं‍ूज।‍ऐुे‍क्षत्रे ों‍पर‍ऄनुमेय‍एफएअर‍और‍ग्राईंड‍ कारेज‍की‍गणना‍के‍जलए‍जाचार‍नूीं‍दकया‍जाएगा। 19.6.1.3 प्लॉटों‍के‍पुनगवठन‍की‍ऄनुमजत‍ूजगी।‍मौजूदा‍ुड़कों‍और‍खलु ‍े स्ट्थानों‍के‍पुनःुंयजजन‍की‍ऄनमु जत‍ ूजगी, बिते‍दकः i) पुनःुंयजजजत‍दकए‍गए‍लअे ईट, ुड़कों‍और‍खलु े‍स्ट्थानों‍के‍तूत‍ुमान‍या‍ऄजधक‍क्षेत्र‍प्रदान‍ करते‍ूों।‍जजन‍क्षेत्रों‍में‍ुड़कों‍का‍ठीक-ठाक‍नेटाकव‍पूले‍ुे‍मौजूद‍ू,, ईुे‍यथाुंभा‍बनाए‍ रखा‍जाना‍चाजूए। ii) ुाावजजनक‍पाकों‍और‍ुड़कों‍के‍पुनगवठन‍के‍जलए‍ुंबंजधत‍ुाावजजनक‍एजेंजुयों‍ुे‍जाजधात‍ ऄनुमजदन‍लने ा‍ूजगा।‍पुनगवरठत‍ुाावजजनक‍क्षेत्रों‍कज‍ुंबंजधत‍ुाावजजनक‍एजेंुी‍कज‍ुौंप‍126 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ददया‍जाएगा, और‍यू‍जनता‍के‍जलए‍खलु ा‍रूगे ा।‍आुुे‍मौजूदा‍पेड़ों‍का‍िून्य‍ऄथाा‍ न्यूनतम‍क्षजत‍ूजगी।‍ 19.6.1.4 पुनरूद्धार‍यजजनाओं‍कज‍मौजूदा‍अाश्यकता‍ुे‍ऄजधक‍और‍ऄजतररि ‍जल‍अपूर्नत‍नूीं‍जमलेगी, जुााय‍ररि ‍भूजम‍ााली‍यजजनाओं‍कज‍छजड़कर, जजनके‍जलए‍ऄजतररि ‍पानी‍की‍अपूर्नत‍मामला- दर-मामला‍अधार‍पर‍की‍जा‍ुकती‍ू।, ‍पानी‍की‍ऄजतररि ‍अाश्यकता‍कज‍पानी‍के‍पुनचवक्रण‍ और‍ाीाव‍जल‍के‍ुंचयन/एकत्रीकरण‍द्वारा‍परू ा‍दकया‍जाना‍चाजूए। 19.6.2 ‍‍दकुी‍पुनरूद्धार‍यजजना‍के‍जलए‍न्यूनतम‍क्षेत्र‍3000‍ागवमीटर‍ूजगा।‍आुमें‍ुूकारी‍ुमूू‍अााुीय‍ुजमजतयों‍ के‍जलए‍2000‍ाग‍वमीटर‍और‍औद्यजजगक‍प्लॉटों‍के‍जलए‍1000‍ागवमीटर‍की‍छूट‍दी‍जाएगी। 19.6.3 ‍‍जनम्नजलजखत‍खंडों‍म‍ेंजाभाजजत‍पुनरूद्धार‍एफएअर, पुनरूद्धार‍यजजनाओं‍पर‍लागू‍ूजगा। क्र.ु.ं प्रजत्ुाून‍पनु रूद्धार‍एफएअर‍की‍ जाकाु‍का‍मापन‍ जाकाु‍का‍ जाकाु‍का‍ गणना‍ूते ‍ुकारक (कम‍ु‍ेकम‍3000 मापन‍(कम‍ु‍े मापन‍(4 कम‍1‍ूक्े टेयर‍ ूक्े टेयर‍तथा‍ ाग‍वमी.‍लदे कन‍1 लदे कन‍4 ूक्े टेयर‍ ईुु‍ेउपर) ूक्े टेयर‍ु‍ेकम)* ु‍ेकम) 1 ुामान्य‍पनु रूद्धार‍कारक‍(ुभी‍ 1.1X** 1.15X 1.2X पुनरूद्धार‍यजजनाओं‍ूते ु‍ईपलब्ध) 2 ुतत‍िूरी‍ुाे ाएं‍(एुयएू ु)‍कारक‍ (नीच‍े ददए‍गए‍2ए‍और‍2बी‍अाश्यकताओं‍कज‍लाग‍ूकरन‍े ूते ु‍ईपलब्ध‍ऄजतररि ‍एफएअर) 2A ग्रीन‍रेरटग*** 0.15X (यदद‍प्ल,रटनम/5 ग्रीन‍रेरटग‍प्राप्त‍ू), 2B 20%‍ुाावजजनक‍खुले‍ूररत‍क्षत्रे लाग‍ू नूीं 0.05X 3 अय‍ुकारक‍ 0.1X (ऄजतररि ‍एफएअर‍केाल‍ईन्ूी‍ यजजनाओं‍के‍जलए‍ईपलब्ध‍जजनमें‍ 50%‍आमारतें‍40 ाीव‍ुे‍ऄजधक‍ पुरानी‍ू)ैं ऄजधकतम‍प्रजत्ुाून‍पनु रूद्धार‍एफएअर 1.35X 1.45X 1.5X * औद्यजजगक‍और‍ुूकारी‍ुमूू ‍अााु‍प्लॉटों‍के‍जलए‍न्यूनतम‍यजजना‍क्षेत्र‍खडं ‍19.6.2 के‍ऄनुुार‍ूजगा। **X‍पुनरूद्धार‍यजजना‍म‍ेंिाजमल‍दकए‍जान‍े ााल‍ेप्रत्येक‍प्लॉट‍ूते ु‍ातवमान‍ऄनुमेय‍एफएअर‍कज‍दिावता‍ू।, ***ुमय-ुमय‍पर‍ुरकार‍द्वारा‍ऄनुमजददत‍कजइ‍भी‍ग्रीन‍रेरटग‍प्रणाली। 19.6.4 पुनरूद्धार‍यजजनाओं‍में‍जनम्नजलजखत‍लागू‍ूोंगेः 19.6.4.1 ‍‍यजजना‍के‍भीतर‍जाजभन्न‍पररुरों‍कज‍डीुीएन‍के‍ऄनुुार‍ऄजतररि ईपयजग‍की‍ऄनुमजत‍ूजगी। 19.6.4.2 = यजजना‍के‍मानदडं ों‍के‍ऄनुुार‍पनु रूद्धार‍यजजना‍के‍भीतर‍ऄच्छी‍गुणािा‍ााल‍े इडब्ल्यएू ु‍अााु‍ प्रदान‍दकए‍जाएंगे।‍इडब्ल्यूएु‍एफएअर, अााुीय‍एफएअर‍के‍ऄजतररि ‍ूजगा,‍जजुकी यजजना‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 127 म‍ें ऄजधकतम‍ऄनुमेय‍अााुीय‍एफएअर‍के‍15%‍के‍रूप‍म‍ेंगणना‍की‍जाएगी।‍इडब्ल्यूएु‍अााु‍ की‍अाश्यकता‍कज‍यजजना‍के‍भीतर‍एक‍पथृ क‍ा‍ऄच्छी‍तरू‍ुे‍जडजाआन‍क्षेत्र‍के‍रूप‍में‍परू ा‍दकया‍ जाएगा, जजुमें‍जनम्न/म्य-ाृजद्ध, ईच्च‍घनत्ा‍जनर्नमत‍स्ट्ारूप, ुाावजजनक‍ूररत‍स्ट्थल‍के‍ईपयजग‍और‍ ुामाजजक‍ुुजाधाएं‍िाजमल‍ूोंगी। 19.6.4.3 3000‍ागवमीटर‍ुे‍कम‍क्षेत्र‍की‍यजजनाओं‍के‍जलए, दकुी‍ा,कजल्पक‍स्ट्थल‍पर‍जनधावररत‍इडब्ल्यूएु‍ अााु‍के‍ुामूजूक‍प्रााधान‍का‍जाकल्प‍भी‍खजजा‍जा‍ुकता‍ू।, 19.6.4.4 ‍‍यजजना‍क्षेत्र‍का‍10%‍स्ट्थान‍ऄजनाायव‍रूप‍ुे‍ुाावजजनक‍ईपयजग‍के‍जलए‍एक‍ुमेदकत‍ूररत‍ ुाावजजनक‍स्ट्थल‍के‍रूप‍में‍जाकजुत‍दकया‍जाएगा, और‍आु‍े स्ट्थानीय‍जनकाय/दद.जा.प्रा.‍कज‍ुौंप‍ ददया‍जाएगा।‍1 ूक्े टेयर‍और‍ईुुे‍ऄजधक‍क्षेत्र‍ााली‍यजजनाओं‍में, आु‍अाश्यकता‍कज‍एक‍ु‍े ऄजधक‍भूखंड‍प्रदान‍करत‍े ुएए‍पूरा‍दकया‍जा‍ुकता‍ू,, जज‍दक‍ुमुदाय‍के‍जलए‍ुाावजजनक‍स्ट्थल‍के‍ रूप‍म‍ेंईपयजग‍करन‍े यजग्य‍ूज‍और‍जजुमें‍कम‍ुे‍कम‍एक‍भखू ंड‍1,000‍ागवमीटर‍का‍ूज। 19.6.4.5 ‍‍‍ुभी‍पुनरूद्धार‍यजजनाएं‍0.2‍का‍जीबीएफ‍कारक‍प्राप्त‍करेंगी।‍(देख:ें‍डीुीएन) 19.6.4.6 ‍‍‍नालों‍ऄथाा‍जलाियों‍के‍ुाथ‍जस्ट्थत‍ुभी‍यजजनाए,ं इएनाी2‍के‍ऄनुुार‍न्यूनतम‍ऄजनाायव‍बफुव‍ और‍भान‍ऄजभजान्याु‍बनाए‍रखेंगी। 19.6.4.7 1‍ूक्े टेयर‍ुे‍ऄजधक‍अकार‍ााले‍प्लॉटों‍की‍ुभी‍यजजनाएं, एचुीपी1‍के‍ऄनुुार‍ुाावजजनक‍प्लाजा‍ प्रदान‍करेंगी।‍प्रमुख‍ुड़कों‍पर‍कॉनवर‍प्लॉट, ऄजनाायव‍रूप‍ुे‍कॉनवर‍प्लाजा‍की‍ुुजाधा‍प्रदान‍करेंगे। 19.6.4.8 18‍मीटर‍और‍ईुुे‍ऄजधक‍मागावजधकार‍ााली‍ुभी‍ुड़कों‍पर‍ुदक्रय‍फ्रंटेज‍रखा‍जाएगा। i) 70%‍भानों‍के‍दकनारों‍पर‍3‍मीटर‍का‍एक‍ुेटब,क‍जबल्ट-टू-एज‍जाकाु‍के‍रूप‍में‍बनाए‍रखा‍ जाएगा।‍आु‍तरू‍के‍जबल्ट-टू-एज‍फ्रंटेज‍का‍कम‍ुे‍कम‍50%‍अकेड्‍ु, कजलजनेड्‍ु, िॉप- फ्रन्ट्‍ु, प,दल‍यात्री‍प्राेि, प्लाजा‍अदद‍का‍ईपयजग‍करते‍ुएए‍ग्राईंड/पजजडयम‍फ्लजर‍पर‍ुदक्रय‍ रखा‍जाएगा।‍अााुीय‍यजजनाएाँ‍कम‍ुे‍कम‍20%‍ुदक्रय‍फ्रंटेज‍बनाए‍रखगें ी। ii) भानों‍कज‍10‍मी.‍ऄथाा‍दज‍मजं जलों‍की‍ईंचाइ‍तक‍रखा‍जाएगा। 19.6.5 अााुीय‍यजजनाओं‍के‍मामले‍में: 19.6.5.1 यजजना‍म‍ें स्ट्थानीय‍स्ट्तर‍की‍ुुजाधाओं‍(ुीजनयर‍ुेकेंडरी‍स्ट्कूलों‍कज‍छजड़कर)‍कज‍ुंबंजधत‍ एजेंजुयों‍के‍ऄनुमजदन‍के‍ुाथ‍िाजमल‍दकया‍जा‍ुकता‍ू।, ‍ऐुे‍मामलों‍म,ें यजजना‍म‍ें आुी‍ प्रकार‍की‍ुमकक्ष‍ुुजाधाओं‍और‍क्षत्रे /यथानुपाजतक‍अधार‍पर‍मानदंडों‍के‍ऄनुुार‍प्रदान‍दकया‍ जाएगा। 19.6.5.2 ऄजतररि ‍स्ट्थानीय‍ुुजाधाओं‍के‍प्रााधान‍के‍जलए‍कम‍ुे‍कम‍5%‍स्ट्ाीकृत‍एफएअर‍का‍ईपयजग‍ दकया‍जाएगा।‍4‍ूक्े टेयर‍या‍ईुुे‍ऄजधक‍अकार‍ााली‍यजजनाएं‍प्रचजलत‍मानदडं ों‍के‍ऄनुुार‍ िूर‍स्ट्तर‍की‍पीएुपी‍ुुजाधाएं‍प्रदान‍करन‍े के‍जलए‍पात्र‍ूोंगी। 19.6.5.3 एफएअर‍का‍5%‍्ााुाजयक‍गजतजाजधयों‍के‍जलए‍ईपयजग‍दकया‍जा‍ुकता‍ू‍, (ज,ुा‍दक‍ ुीएुुी‍और‍एलएुुी‍म‍ेंऄनमु ेय‍ू), ।128 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 19.6.5.4 आु‍तरू‍के‍पीएुपी‍और‍्ााुाजयक‍ईपयजग, ज,ुा‍दक‍खंड‍19.6.5.2‍और‍19.6.5.3‍म‍ें ददया‍गया‍ू,, उ्ाावधर‍जमश्रण‍के‍मा्यम‍ुे‍जाकजुत‍दकए‍जा‍ुकते‍ू।ैं 19.6.5.5 यजजना‍क्षेत्र‍(ुूकारी‍ुमूू‍अााु‍ुजमजतयों‍के‍मामल‍े म‍ें भी,‍जजुके‍जलए‍रजजस्ट्रार‍ऑफ‍ ुजुायटीज‍द्वारा‍ुंबंजधत‍जाजनयमों/ऄजधजनयमों‍में‍ुंिजधन‍दकया‍जा‍ुकता‍ू), ‍में‍अााु‍ आकाआयों‍की‍ुंख्या‍में‍ाृजद्ध‍की‍ऄनुमजत‍दी‍जाएगी।‍ 19.6.6 ‍पारगमन‍स्ट्टेिनों‍के‍500‍मीटर‍के‍दायरे‍म‍ें रीजेनरेिन‍यजजनाओं‍के‍मामल‍े म‍ें (टीओडी‍नजड्ु‍के‍रूप‍म‍ें घजजीत‍ कज‍छजड़कर), जनम्नजलजखत‍की‍ऄनुमजत‍ूजगी: 19.6.6.1 ग्राईंड‍कारेज‍ऄजधकतम‍50%‍तक 19.6.6.2 टीओडी‍यजजनाओं‍म‍ेंलागू‍पार्ककग‍मानदडं ‍ 19.6.6.3 अााुीय‍यजजनाए‍ं पीएुपी‍ुजु ाधाओं‍के‍प्रााधान‍के‍जलए‍ऄनुमेय‍एफएअर‍के‍10%‍तक‍का‍ ईपयजग‍कर‍ुकती‍ू ैं 19.7 कायनव ीजतक‍पनु रूद्धार 19.7.1 ‍‍्ाुाय‍प्रजत्ुाून‍जजले‍(बीपीडी)‍कज‍कायनव ीजतक‍अर्नथक‍और‍ुांस्ट्कृजतक‍केंद्र‍के‍रूप‍में‍बढ़ााा‍ददया‍जाएगा।‍ बीपीडी‍के‍रूप‍में‍पूचाने‍गए‍पूरे‍क्षेत्र‍के‍जलए‍पनु रूद्धार‍यजजना‍त,यार‍की‍जाएगी। 19.7.2 ‍‍बीपीडी‍के‍भीतर‍यजजनाओं‍कज‍खडं ‍19.6.1‍और‍19.6.4‍के‍ऄनुुार‍जाकजुत‍दकया‍जाएगा, ईच्च‍पुनरूद्धार‍ एफएअर‍कज‍ऐुी‍यजजनाओं‍के‍जलए‍जनम्नजलजखत‍ताजलका‍के‍ऄनुुार‍प्रदान‍दकया‍जाएगाः क्र.ु.ं प्रजत्ुाून‍पनु रूद्धार‍एफएअर‍की‍गणना‍ जाकाु‍का‍मापन‍(कम‍ जाकाु‍का‍मापन‍ जाकाु‍का‍मापन‍ ूते ‍ुकारक ु‍ेकम‍5000 ाग‍वमी.‍ (कम‍ु‍ेकम‍1‍ (4 ूक्े टेयर‍तथा‍ लदे कन‍1 ूक्े टेयर‍ु‍ेकम) ूक्े टेयर‍लदे कन‍4 ईुु‍ेउपर) ूक्े टेयर‍ु‍ेकम) 1 बुे ‍पनु रूद्धार‍कारक‍(बीपीडी‍के‍ुाथ‍ 1.2X* 1.3X 1.4X ुभी‍पुनरूद्धार‍यजजनाओं‍ूते ु‍ईपलब्ध) 2 ुतत‍िूरी‍ुाे ाएं‍(एुयएू ु)‍कारक‍ (नीच‍े ददए‍गए‍2ए‍और‍2बी‍अाश्यकताओं‍कज‍लाग‍ूकरन‍े ूते ु‍ईपलब्ध‍ऄजतररि ‍एफएअर)‍ 2A ग्रीन‍रेरटग 0.15X (यदद‍प्ल,रटनम/5 ग्रीन‍रेरटग‍प्राप्त‍ू), 2B 20%‍ुाावजजनक‍खुले‍ूररत‍क्षत्रे लाग‍ू नूीं 0.05X 3 ईपयजग‍ुां धनव ‍(यएू ुपी)‍कारक 0.2X 0.2X 0.2X (केाल‍ग,र‍अााुीय‍ईपयजगों‍कज‍लाग‍ू करने‍के‍जलए‍ूी‍ऄजतररि ‍एफएअर‍ ईपलब्ध) ऄजधकतम‍प्रजत्ुाून‍पनु रूद्धार‍एफएअर 1.55X 1.7X 1.8X *X 'अधार‍एफएअर' कज‍दिावता‍ू,, ऄथावत‍पनु रूद्धार‍यजजनाओं‍म‍ें िाजमल‍दकए‍जा‍रू‍े प्रत्येक‍प्लॉट‍के‍जलए‍ ातवमान‍ऄनुमेय‍एफएअर।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 129 7.3 बीपीडी‍के‍भीतर‍यजजनाओं‍कज‍यजजना‍स्ट्तर‍पर‍ऄजधकतम‍275‍एफएअर, और‍टीडीअर‍के‍रूप‍म‍ें ऄजतररि ‍25‍एफएअर‍की‍ऄनमु जत‍ूजगी।‍ 19.8 ऄजाकजुत‍जनजी‍भखू डं ज‍का‍एकीकरण 19.8.1 ‍‍ददल्ली‍म‍ें कुछ‍जनजी‍स्ट्ााजमत्ा‍ााली‍भूजम‍पॉकेट्‍ु/खंड‍ू,ैं जज‍कइ‍कारणों‍ुे‍ऄब‍तक‍जनयजजजत‍जाकाु‍के‍ दायरे‍ु‍े बाूर‍रू‍ेू,ैं ज,ुे‍ऄजधग्रूण‍की‍ऄनजधुूचना, ऄजधग्रूण‍ु‍े बजूष्कार, कानूनी‍ऄजतक्रमण‍अदद।‍ऐुी‍ भूजम‍पॉकेट्‍ु‍का‍जनयजजजत‍जाकाु‍''जनजी‍स्ट्ााजमत्ा‍ााली‍भूजम‍के‍जनयजजजत‍जाकाु‍कज‍ुक्षम‍बनाने‍ूते ‍ु जाजनयम'' के‍ऄनुुार‍ूजगा। 19.9 ऄजनयजजजत‍क्षत्रे ों‍का‍पनु रूद्धार 19.9.1 ‍‍ददल्लीााजुयों‍की‍एक‍बड़ी‍अबादी‍भानों‍की‍खराब‍जस्ट्थजत, ऄपयावप्त‍पुएचं ‍(जािेीकर‍अपात‍जस्ट्थजत‍के‍ दौरान), और‍ऄपयावप्त‍भौजतक‍और‍ुामाजजक‍बुजनयादी‍ढांचे‍की‍जािेीता‍ााल‍े ऄजनयजजजत‍और/ऄथाा‍ ऄनजधकृत‍क्षेत्रों‍में‍रूती‍ू‍, और‍काम‍करती‍ू।, ‍ूालांदक, ये‍क्षेत्र‍ईच्च‍घनत्ा, जमश्रण-ईपयजग‍के‍केन्द्र‍के‍रूप‍ में‍ईभरे‍ू,ैं जज‍अााु, ुूक्ष्म, लघ‍ु और‍म्यम‍ईद्यमों‍के‍जलए‍दकफायती‍जाकल्प‍प्रदान‍करत‍े ू।ैं ‍कइ‍धरजूर‍ िूरी‍गांा‍भी‍नाीनतम‍खुदरा‍और‍ुांस्ट्कृजतक‍ऄथव्ास्ट्थाओं‍के‍केंद्र‍के‍रूप‍म‍ें ऄपने‍अप‍कज‍दफर‍ुे‍ईभार‍ रू‍े ू।ैं ‍आन‍क्षेत्रों‍म‍ें ुुरक्षा‍मानकों, ऄाुंरचना‍और‍जीान‍की‍गुणािा‍में‍ाृजद्ध‍करते‍ुएए‍आु‍क्षमता‍कज‍ पुनःुुदढ़ृ ‍करने‍की‍अाश्यकता‍ू।, 19.9.2 ‍‍िूर‍में‍ऄजनयजजजत‍क्षेत्रों‍के‍चार‍्ापक‍प्रकारों‍की‍पूचान‍की‍गइ‍ू।, ‍प्रत्येक‍प्रकार‍के‍जलए‍पुनरूद्धार‍के‍ प्रााधान‍प्रदान‍दकए‍गए‍ू:ैं i) ऄनजधकृत‍कालजजनयां‍(यूुी), जजनम‍ें जनयजमत‍की‍गईं‍ऄनजधकृत‍कालजजनयां‍और‍जनयजमतीकरण‍के‍ जलए‍जचजननत‍की‍गइ‍कालजजनयां‍िाजमल‍ू।ैं ‍(19.10) ii) िूर‍म‍ेंऄजधुूजचत‍लाल‍डजरा‍और‍जास्ट्ताररत‍लाल‍डजरा‍क्षेत्रों‍ुजूत‍िूरी‍गांा‍(खंड‍19.10.6 देख)ें iii) स्ट्लम‍और‍जेज‍े क्लस्ट्टर‍(खंड‍19.11 देख)ें iv) ऄुंगत‍औद्यजजगक‍क्षत्रे ‍(खंड‍19.12 देख)ें v) ऄुंगत‍गजदाम‍क्लस्ट्टर‍(खंड‍19.13 देख)ें ‍ 19.10 युू ी‍का‍पनु रूद्धार 19.10.1 यूुी/पाटव‍यूुी‍में‍जनम्नजलजखत‍प्रकार‍ुे‍ुुधार‍दकया‍जाएगाः i) ुंबंजधत‍भूजम‍ऄथाा‍ुंपजि‍के‍माजलक‍ऄथाा‍अरडब्ल्यूए‍एक‍पुनरूद्धार‍यजजना‍के‍ुाथ‍अगे‍अ‍ुकत‍े ू।ैं ‍ऐुी‍यजजनाओं‍कज‍लेअईट‍और‍जनमावण‍मंजूरी‍ूते ु‍स्ट्ातत्रं ‍लेअईट‍के‍रूप‍में‍माना‍जाएगा, और‍ जनयजमत‍लेअईट‍के‍ुाथ‍ऄथाा‍आुके‍बगर, ‍आन्ू‍ें दकुी‍भी‍ऄनजधकृत‍कॉलजजनयों‍(यूुी)‍में‍प्रस्ट्ताजात‍ दकया‍जा‍ुकता‍ू।, ‍130 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ii) जाजनयमों‍के‍ऄनुुार‍यूुी‍ऄपने‍मौजूदा‍लअे ईट‍के‍जनयजमतीकरण‍के‍जलए‍ा,कजल्पक‍रूप‍ु‍ेअाेदन‍कर‍ ुकती‍ू।ैं ‍एक‍बार‍लअे ईट‍स्ट्ाीकृत‍ूज‍जाने‍के‍बाद, एकल‍भूजम‍/‍ुंपजि‍के‍माजलक‍जनमाणव ‍यजजना‍की‍ मंजूरी‍के‍जलए‍अग‍ेबढ़‍ुकत‍े ू।ैं 19.10.2 ऄनजधकृत‍कॉलजनी‍(युू ी)‍पनु रूद्धार‍यजजनाएं:‍यूुी/पाटव‍युू ी‍जज‍यूुी‍पुनरूद्धार‍यजजना‍कज‍लागू‍करना‍ चाूती‍ू‍, ाू‍एक‍जाकाुकताव‍ुंस्ट्था‍(डीइ)‍के‍रूप‍म‍ें ुामन‍े अएगी‍और‍ुंबंजधत‍जाजनयमों‍में‍जनधावररत‍ प्रदक्रयाओं‍के‍ऄनुुार‍एक‍यजजना‍प्रस्ट्ततु ‍करेगी।‍आु‍ूते ु‍जनम्नजलजखत‍मानदडं ‍लाग‍ूूोंगेः 19.10.2.1 ‍‍आु‍यजजना‍क्षेत्र‍म‍ें 12 मीटर‍मागावजधकार‍(यजजना‍की‍पररजध‍के‍कम‍ु‍े कम‍15%‍के‍जलए)‍की‍ मौजूदा‍ुड़क‍ुे‍ुीधी‍पुएचं ‍ूजगी।‍आु‍मानदडं ‍कज‍ुड़क‍कज‍चौडा‍करन‍े के‍जलए‍क्षेत्र‍प्रदान‍करके‍ पूरा‍दकया‍जा‍ुकता‍ू,, बिते‍दक‍आु‍यजजना‍म‍ें एक‍पूरी‍ुड़क‍कज‍िाजमल‍दकया‍जाए, जज‍कम‍ु‍े कम‍एक‍तरफ‍ुे‍न्यूनतम‍12 मीटर‍मागावजधकार‍ााली‍ुड़क‍ुे‍जुड़ती‍ूज। 19.10.2.2 चार‍प्रकार‍की‍यजजनाओं‍कज‍प्रस्ट्ताजात‍दकया‍जा‍ुकता‍ूः, i) स्ट्तर‍1: 2,000 - 3,000 ागवमीटर‍ुमेदकत‍भूजम‍क्षत्रे ii) स्ट्तर‍2: 3,000 - 5,000 ागवमीटर‍ुमेदकत‍भूजम‍क्षत्रे iii) स्ट्तर‍3: 5,000 - 10,000 ागवमीटर‍ुमेदकत‍भूजम‍क्षत्रे iv) स्ट्तर‍4: 10,000 ागवमीटर‍ुे‍ऄजधक‍ुमेदकत‍भूजम‍क्षत्रे 19.10.2.3 ‍‍ुड़कों‍के‍जाकाु‍ऄथाा‍ईन्ू‍ें चौडा‍करने‍के‍जलए‍जनधावररत‍ुेटब,क्ु‍का‍एक‍बड़ा‍जूस्ट्ुा‍ईपयजग‍ दकया‍जाएगा।‍यू‍न‍केाल‍युू ी‍के‍भीतर‍पुएचं ‍में‍ुुधार‍करेगा, बजल्क‍न्यूनतम‍पुएचं ‍की‍ितव‍कज‍ पूरा‍करके, ऄजनयजजजत‍क्षेत्रों‍कज‍यूुी‍पुनरूद्धार‍यजजनाओं‍के‍ुाथ‍अग‍े अन‍े के‍ऄाुर‍भी‍प्रदान‍ करेगा।‍आु‍प्रकार, जब‍भी‍अाश्यकता‍ूजगी, ुाावजजनक‍ुड़कों‍के‍जलए‍ुभी‍भूजम‍ुंबंजधत‍ स्ट्थानीय‍जनकाय‍कज‍ुौंप‍दी‍जाएगी। 19.10.2.4 ‍‍डीइ‍यू‍ुुजनजित‍करेंग‍े दक‍यजजना‍जनयजमत‍अकार‍और‍ुीमा‍में‍ू।, ‍ुड़क‍के‍ुाथ‍प्लॉटों‍की‍एकल‍ पंजि ‍के‍र,जखक‍ुमामेलन‍की‍ऄनुमजत‍नूीं‍दी‍जाएगी, जब‍तक‍दक‍एकल‍प्लॉट‍750‍ाग‍व मीटर‍या‍ ऄजधक‍क्षेत्र‍म‍ेंन‍ूों। 19.10.2.5 ‍‍दज‍या‍ऄजधक‍ुमीपाती‍यूुी/पाटव‍यूुी‍कज‍एकल‍यूुी‍पुनरूद्धार‍यजजना‍के‍तूत‍लाया‍जा‍ुकता‍ू।, ‍ एक‍यजजना‍में‍यूुी‍की‍ुीमा‍के‍बाूर‍का‍ऄजतररि ‍क्षेत्र‍भी‍िाजमल‍ूज‍ुकता‍ू,, यदद‍दजनों‍तरफ‍ की‍भूजम/ुंपजि‍के‍माजलक‍आुे‍एकीकृत‍तरीके‍ु‍े जनयजजजत‍करन‍े ूते ‍ु ुूमत‍ूों।‍यू‍ऄजतररि ‍क्षत्रे ,‍ यजजना‍क्षेत्र‍के‍25%‍ुे‍ऄजधक‍नूीं‍ूजगा, और‍एफएअर‍की‍गणना‍के‍जलए‍आु‍क्षेत्र‍पर‍भूजम‍ ईपयजग‍के‍ऄनुुार‍दद.म.ुयज.‍मानदंड‍लाग‍ूूोंगे। 19.10.2.6 ‍‍एकीकृत‍यजजना‍के‍प्रयजजनों‍के‍जलए‍ुाावजजनक‍क्षेत्र‍ज,ुे‍ुड़क, खुली‍जगू, नाल‍े अदद‍कज‍स्ट्तर‍3-4 यजजनाओं‍म‍ें िाजमल‍दकया‍जा‍ुकता‍ू।, ‍ूालांदक, ऐुी‍ुाावजजनक‍ुुजाधाओं‍के‍तूत‍क्षेत्र‍कज‍ न्यूनतम‍क्षेत्र‍की‍अाश्यकताओं‍कज‍पूरा‍करन‍े ऄथाा‍एफएअर, तथा‍ग्राईंड‍कारेज‍की‍गणना‍के‍ जलए‍जाचार‍नूीं‍दकया‍जाएगा।‍ऐुे‍क्षेत्रों‍कज‍ऄंजतम‍लेअईट‍के‍जूस्ट्ुे‍के‍रूप‍म‍ें पुनःुंयजजजत‍दकया‍ जा‍ुकता‍ू,, बिते‍दक‍खडं ‍19.4.5‍में‍ईजल्लजखत‍ुभी‍ुामान्य‍ितों‍का‍पालन‍दकया‍जाए। 19.10.3 ऄनजधकृत‍कॉलजजनयों‍(युू ी)‍म‍ेंपनु रूद्धार‍यजजनाओं‍ूते ‍ुएफएअरः 19.10.3.1 ‍‍दकुी‍ऄनजधकृत‍कॉलजनी‍पुनरूद्धार‍यजजना‍के‍जलए‍एफएअर‍की‍गणना‍जनम्नानुुार‍की‍जाएगीः[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 131 प्लॉट‍का‍क्षत्रे फल‍(ागमव ीटर) ऄनमु ये ‍एफएअर* 175‍तक 350 175‍ुे‍250‍तक 300 250 ुे‍750‍तक 250 750 ुे‍1500‍तक 225 1500‍तथा‍आुुे‍ऄजधक 200 *यदद‍दकुी‍प्लॉट‍के‍जलए‍गणना‍दकया‍गया‍क्षेत्र, आु‍ूते ‍ु जनधावररत‍जनम्न‍श्रेणी‍क्षेत्र‍ुे‍कम‍ू‍, तज‍ऐु‍े प्लॉट‍के‍जलए‍जनम्न‍श्रेणी‍के‍ऄजधकतम‍जनर्नमत‍क्षेत्र‍कज‍ऄनुमजत‍दी‍जाएगी। 19.10.3.2 यूुी‍में‍ुुजाधाओं‍की‍ईपलब्धता‍कज‍बेूतर‍बनान‍े के‍जलए, एक‍जािेी‍ुुजाधा‍एफएअर,‍ प्रजत्ुाून‍पुनरूद्धार‍एफएअर‍के‍रूप‍में‍ईपलब्ध‍ूजगाः‍ ऄनजधकृत‍कॉलानी‍ ुजु ाधा‍एफएअर जाजनयामक‍ित ें पनु रूद्धार‍यजजना‍का‍स्ट्तर स्ट्तर 1 20 मा्यजमक‍स्ट्कूलों‍और‍िूर-स्ट्तरीय‍ुुजाधाओं‍की‍ ऄनुमजत‍नूीं‍ूजगी‍। स्ट्तर 2 30 स्ट्तर 3 40 ुभी‍पीएुपी‍ईपयजग‍की‍ऄनुमजत‍ूजगी, बित‍े दक‍खुली‍जगू‍की‍अाश्यकताएं‍पूरी‍की‍गइ‍ूों।‍ स्ट्तर 4 50 िूर‍स्ट्तर‍की‍ुुजाधाओं‍ूते ‍ु ऄलग‍प्राेि/जनकाु‍ तथा‍ुर्नाु‍कजर‍प्रदान‍दकया‍जाएगा।‍ 19.10.3.3 ऄनुमेय‍यजजना‍एफएअर‍ुभी‍ुघं टक‍भूजम‍खंडों‍के‍एफएअर‍का‍यजग‍ूजगा, जजुमें‍ऄजतररि ‍ एफएअर‍के‍ुाथ‍ुुजाधा‍एफएअर‍के‍रूप‍म‍ेंऄजतररि ‍एफएअर‍िाजमल‍ूजगा। 19.10.3.4 ुभी‍यजजनाओं‍के‍जलए‍भूजम‍का‍अधार‍ईपयजग‍अााुीय‍ूजगा। i) जबदक‍दद.मु.यज.‍के‍मानक‍200‍एफ.ए.अर.‍कज‍अधार‍एफएअर‍माना‍जाएगा‍और‍यू‍दकुी‍ भी‍जनयजमतीकरण‍िल्ु क‍ु‍े मि ु ‍ूजगा, ुभी‍ऄजतररि ‍यजजना‍स्ट्तर‍एफएअर‍कज‍दद.जा.प्रा.‍ द्वारा‍जनधावररत‍दरों‍पर‍डीइ‍कज‍खरीदना‍ूजगा।‍आु‍तरू‍के‍िुल्क‍डीइ‍द्वारा‍बनाए‍गए‍60 ागवमीटर‍के‍प्रत्येक‍ुस्ट्ते‍दकराये‍की‍अााु‍आकाइ‍के‍जलए‍माफ‍दकए‍जाएंगे, और‍15 ाीों‍की‍ ऄाजध‍के‍जलए‍जाजनयजमत‍दकराए‍पर‍आन्ू‍ें बनाए‍रखा‍जाएगा।‍ऐुी‍ुंपजियााँ‍एक‍ुाावजजनक‍ दकराये‍की‍अााु‍ुूची‍का‍जूस्ट्ुा‍ूोंगी, और‍आु‍तरू‍की‍ुंपजियों‍के‍ुभी‍दकराये‍के‍लने दने ‍ कज‍आु‍ईद्देश्य‍के‍जलए‍दद.जा.प्रा.‍द्वारा‍ुृजजत‍एक‍पजटलव ‍के‍मा्यम‍ुे‍जनष्पाददत‍दकया‍जाएगा। ii) ऄंजतम‍यजजना‍एफएअर‍का‍5% स्ट्थानीय‍स्ट्तर‍पर‍्ााुाजयक‍और‍पीएुपी‍ुुजाधाएं‍प्रदान‍ करने‍के‍जलए‍ऄजनााय‍व रूप‍ु‍े ईपयजग‍दकया‍जाएगा।‍डीइ‍के‍पाु‍आु‍तरू‍की‍ुुजाधाओं‍के‍ जलए‍15% तक‍के‍एफएअर‍का‍ईपयजग‍करने‍का‍जाकल्प‍ूजगा। 19.10.4 ऄनजधकृत‍कॉलजजनयों‍म‍ेंपनु रूद्धार‍यजजनाओं‍ूते ‍ुऄन्य‍जाकाु‍मानदडं ः 19.10.4.1 जनम्नजलजखत‍ऄन्य‍जाकाु‍मानदंड‍लाग‍ूूोंगेः मानदडं स्ट्तर‍1 स्ट्तर‍2 स्ट्तर‍3 स्ट्तर‍4 ग्राईंड‍कारेज 50%‍तक 50%‍तक 40%‍तक 40%‍तक छजर‍की‍जस्ट्थजत‍ - 12 मी.‍और‍आुुे‍ऄजधक‍के‍मागावजधकार‍पर‍2‍मी. के‍ऄनुुार‍132 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] न्यनू तम‍ुेटब,क*‍ - 12 मी.‍ुे‍कम‍मागावजधकार‍ुे‍पुएचं ‍पर‍ुाआडों‍पर‍4.5‍मीटर - जाद्यमान‍जनर्नमत‍क्षेत्र‍ुे‍जडु े‍ुभी‍ुाआडों‍पर‍6‍मीटर ुाावजजनक‍ एक‍ूी‍प्लॉट‍के‍ एक‍ूी‍प्लॉट‍के‍ ुाावजजनक‍ ुाावजजनक‍ईद्देश्य‍ स्ट्थल** रूप‍म‍ें10% रूप‍म‍ें10% ईद्देश्य‍के‍जलए‍ के‍जलए‍प्लॉट‍के‍ प्लॉट‍के‍रूप‍म‍ें रूप‍म‍ें10%‍ 10%‍जजुमें‍ जजुमें‍कम‍ुे‍कम‍ कम‍ुे‍कम‍500 1000 ागवमीटर‍ ागवमीटर‍का‍एक‍ का‍एक‍प्लॉट‍ प्लॉट‍िाजमल‍ िाजमल‍ूज। ूज।‍ पार्ककग 1.0 इुीएु‍/‍100 ागव‍मीटर। ुामाजजक‍ - 1 ुे‍3 दकमी‍के‍दायरे‍म‍ेंपूले‍ुे‍मौजूद‍मौजूदा‍ईपलब्ध‍ अधाररक‍ अधाररक‍ुंरचना‍के‍अधार‍पर‍5%‍ुे‍15% ुंरचना‍ूते ‍ु भूजम*** *ुेटब,क‍कज‍ूर‍ुमय‍बाधा‍रजूत‍रखा‍जाएगा‍और‍अाश्यकता‍ूजने‍पर‍ुड़क‍कज‍चौडा‍करने‍/जनमाणव ‍ के‍जलए‍ईपलब्ध‍कराया‍जाएगा **आुमें‍न्यूनतम‍9 मीटर‍मागावजधकार‍ु‍े पुएचं ‍ूजगी‍और‍आु‍े स्ट्थानीय‍जनकाय‍कज‍ऄतं ररत‍दकया‍ जाएगा।‍स्ट्थानीय‍जनकाय‍अाश्यकता‍के‍ऄनुुार‍पाकों, प्लाजा‍ऄथाा‍ईपयजजगताओं‍की‍स्ट्थापना‍के‍ जलए‍ऐुे‍ुाावजजनक‍स्ट्थान‍का‍ईपयजग‍कर‍ुकते‍ू।ैं ***आुे‍न्यूनतम‍9 मीटर‍मागावजधकार‍ुे‍पुएचं ‍के‍ुाथ‍एक‍ुमेदकत‍भूखंड‍के‍रूप‍म‍ें प्रदान‍दकया‍ जाएगा, और‍स्ट्थानीय‍जनकाय‍कज‍ऄतं ररत‍दकया‍जाएगा।‍स्ट्थानीय‍जनकाय‍स्ट्कूलों‍या‍बुए-ुुजाधा‍ (स्ट्ाास्ट््य‍ुुजाधाएं, ुामुदाजयक‍ूॉल,‍बस्ट्ती‍जाकु‍केंद्र, पुजलु‍पजस्ट्ट, चाआल्ड-केयर‍ुेंटर, प्रारंजभक‍ जिक्षा‍केंद्र, छजटे‍प,माने‍पर‍गर, -प्रदीू णकारी‍अर्नथक‍गजतजाजधयााँ, ुामुदाजयक‍ग्रीन-ाेस्ट्ट‍रीुाआलक्लग, ढलाा‍ऄथाा‍ुामग्री‍प्राजप्त‍केंद्र, ऄनौपचाररक‍बाजार‍अदद‍कज‍जमलाकर)‍केंद्रों‍के‍प्रााधान‍के‍जलए‍भूजम‍ का‍ईपयजग‍कर‍ुकते‍ू‍ैं। 19.10.4.2 यूुी‍पुनरूद्धार‍यजजनाओं‍के‍जूस्ट्ुे‍के‍रूप‍में, ुामाजजक‍अधाररक‍ुंरचना‍के‍प्रााधान‍के‍जलए‍ जनम्नजलजखत‍मानदंड‍लागू‍ूोंगेः ुजु ाधा* पथृ क‍प्लॉट‍पर‍जनर्नमत‍ुजु ाधाए ं उ्ााधव र‍जमश्रण‍के‍मा्यम‍ु‍ेदी‍जान‍े ााली‍ुजु ाधाए ं न्यनू तम‍ एफए ग्राईंड‍कारेज‍ न्यनू तम‍ ऄजतररि ‍ित ें प्लॉट‍क्षत्रे ‍ अर (%) जनर्नमत‍क्षत्रे ‍ (ागमव ीटर) (ागमव ीटर) प्राथजमक‍ 800 120 30 960 खुले‍स्ट्थल‍की‍ स्ट्कूल अाश्यकताओं‍कज‍परू ा‍ करना। ुीजनयर‍ 2000 150 35 3000 खुले‍स्ट्थल‍की‍ ुेकेंडरी‍ अाश्यकताओं‍कज‍परू ा‍ स्ट्कूल करना।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 133 कजइ‍ऄन्य‍ बुए‍ुुजाधा‍ 120 30 600 ऄजधकतम‍50‍जबस्ट्तरों‍ स्ट्थानीय‍ ुेंटर‍के‍रूप‍ ााली‍ुुजाधा‍(60‍ ुुजाधा म‍ें 500‍-‍ ागवमीटर‍प्रजत‍जबस्ट्तर‍ 1000 की‍दर‍ुे)‍के‍ुाथ‍ स्ट्ाास्ट््य‍ुुजाधाओं‍कज‍ त,यार‍दकया‍जा‍ुकता‍ ू।, 19.10.4.3 एक‍बार‍पुनरूद्धार‍यजजना‍का‍ऄनुमजदन‍ूज‍जाने‍के‍ईपरान्त, स्ट्तर‍4‍यजजनाओं‍के‍मामल‍े म‍ें न्यूनतम‍3,000‍ागवमीटर‍के‍छजटे‍ब्लॉक‍के‍जलए‍कायावन्ायन‍की‍ऄनुमजत‍दी‍जा‍ुकती‍ू।, 19.10.5 मौजूदा‍यूुी‍की‍लेअईट‍यजजना‍का‍ऄनुमजदन‍जाजनयमों‍के‍ऄनुुार‍ूजगा। 19.10.5.1 एक‍बार‍लअे ईट‍प्लान‍कज‍मंजूरी‍जमल‍जान‍े के‍बाद, एकल‍प्लॉट-लेाल‍जबलल्डग‍प्लान‍ स्ट्ाीकृजतयों‍ूते ु‍अाेदन‍ुंबंजधत‍स्ट्थानीय‍जनकाय‍कज‍प्रस्ट्तुत‍दकए‍जा‍ुकते‍ू।ैं 19.10.5.2 ुभी‍स्ट्ाीकृत‍प्लॉटों‍का‍भूजम‍ईपयजग‍'अााुीय' ूजगा।‍ूालांदक, ऐुे‍यूुी‍के‍भीतर‍स्ट्थानीय‍ स्ट्तर‍की‍ुुजाधाओं‍का‍प्रााधान‍ुुजनजित‍करने‍के‍जलए, जनम्नजलजखत‍की‍ऄनुमजत‍ूजगीः i) खंड‍19.2.12 में‍ईपरजि ‍ार्नणत‍ई्ाावधर‍जमश्रण‍के‍मानदडं ों‍के‍ऄनुुार, 100 ागवमीटर‍या‍ ईुुे‍ ऄजधक‍ और‍ 9मी.‍ मागावजधकार‍ के‍ऄंतगवत‍अन‍े ााल‍े प्लॉटों‍ कज‍स्ट्थानीय‍ स्ट्तर‍ की‍ ुुजाधाओं‍(ुेकेंडरी‍स्ट्कूलों‍कज‍छजड़कर)‍के‍जलए‍अााुीय‍एफएअर‍का‍100%‍तक‍ईपयजग‍ करने‍की‍ऄनुमजत‍ूजगी। ii) न्यूनतम‍6‍मीटर‍मागावजधकार‍के‍ुाथ‍पुएचं ‍ााल‍े ुभी‍प्लॉटों‍पर‍5%‍तक‍्ााुाजयक‍कायों‍ की‍ऄनुमजत‍ूजगी। iii) आु‍तरू‍के‍ईपयजगों‍कज‍'जूां‍ू', ाूां‍ऄनुमजदन‍के‍भाग‍के‍ुाथ-ुाथ‍प्लॉट‍स्ट्तर‍के‍पुनर्ननमाणव ‍ के‍रूप‍में‍ऄनुमजत‍दी‍जाएगी। 19.10.6 ुमद्धृ ‍ऄनजधकृत‍कॉलजजनया:ं ुमृद्ध‍यूुी, ज,ुा‍दक‍केन्द्र‍ुरकार‍द्वारा‍जचजन्ूत‍ू,, जनधावररत‍मानदंडों‍के‍ ऄनुुार‍लअे ईट‍यजजना‍ऄनुमजदन‍और‍पुनरूद्धार‍यजजनाओं‍के‍जाकाु‍के‍जलए‍पात्र‍ूोंगे। 19.11 स्ट्ा-स्ट्थान‍ेस्ट्लम‍पनु ााुव ‍यजजनाए ं 19.11.1 जनम्नजलजखत‍मानदंड‍स्ट्ा-स्ट्थान‍ेस्ट्लम‍पुनाावु‍यजजनाओं‍के‍जलए‍लागू‍ूोंगे। 19.11.1.1 2000‍ागवमीटर‍(न्यूनतम‍9मी.‍मागावजधकार‍पर)‍के‍न्यनू तम‍अकार‍ााले‍ुमूू‍अााु‍ मानदंडों‍की‍ऄनुमजत‍ूजगी।‍भूजम‍के‍अााुीय‍घटक‍पर‍ऄजधकतम‍900‍डीयू/ूक्े टेयर‍ुघनता‍ की‍ऄनुमजत‍ूजगी। 19.11.1.2 जचजन्ूत‍लाभार्नथयों‍(प्रजत‍डीय‍ू 25-40‍ागवमीटर‍की‍दर‍ुे)‍कज‍अााु‍प्रदान‍करन‍े के‍जलए‍ न्यूनतम‍60%‍स्ट्थल‍का‍ईपयजग‍दकया‍जाएगा, और‍ऄजधकतम‍40%‍लाभकारी‍घटक‍ूजगा। 19.11.1.3 यजजना‍कज‍ुमग्र‍रूप‍ु‍े 400‍के‍ऄजधकतम‍एफएअर‍के‍ुाथ‍लाभकारी‍भूजम‍के‍अााुीय‍ घटक‍पर‍ुमग्र‍तरीके‍ुे‍जडजाआन‍दकया‍जाना‍चाजूए।‍जमजश्रत‍ईपयजगों‍ााली‍भूजम‍के‍ लाभकारी‍घटक‍पर‍300‍का‍एफएअर‍लागू‍ूजगा।134 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 19.11.1.4 पररयजजना/यजजना‍ के‍ तूत‍ ुमायजजजत‍ जनुंख्या‍ के‍ ऄनुुार, स्ट्थानीय‍ ुुजाधाओं‍ कज‍ अााुीय‍ एफएअर‍ के‍ जूस्ट्ुे‍ के‍ रूप‍ में‍ प्रदान‍ दकया‍ जाएगा।‍ ऄजधभजगी‍ परराारों‍ की‍ अजीजाका‍कज‍बढ़ााा‍देने‍और‍नए‍रजजगार‍के‍ऄाुर‍प,दा‍करने‍के‍जलए, अााुीय‍घटक‍के‍ ऄनुमेय‍एफएअर‍का‍10%‍ऄजनाायव‍रूप‍ुे‍्ााुाजयक‍और‍औद्यजजगक‍गजतजाजधयों‍के‍ ुृजन‍के‍जलए‍ईपयजग‍दकया‍जाएगा।‍ऐुी‍ुुजाधाओं‍कज‍उ्ाावधर‍जमश्रण‍के‍भाग‍के‍रूप‍में‍ ुमायजजजत‍दकया‍जा‍ुकता‍ू।, ‍ुर्नाु‍फ्लजर‍कज‍ुामुदाजयक‍कायव‍केंद्रों‍के‍रूप‍में‍ईपयजग‍ करने‍की‍ऄनुमजत‍दी‍जाएगी, बिते‍दक‍ाूां‍कजइ‍स्ट्थायी‍ुंरचनाएं/दफक्चु‍व नूीं‍बनाए‍गए‍ ूों। 19.11.1.5 ुामुदाजयक‍केंद्रों‍(न्यूनतम‍18‍मी.‍मागावजधकार‍ााली‍पररयजजनाएं)‍और‍जजला‍केन्द्रों‍(30‍मी.‍ या‍ ईुुे‍ ऄजधक‍ की‍ मागावजधकार‍ ााली‍ पररयजजनाओं)‍ में‍ ्ााुाजयक‍ गजतजाजधयों‍ की‍ ऄनुमजत‍ूजगी। 19.11.1.6 ुाझा‍पार्ककग‍0.5 इुीएु‍प्रजत‍100 ागवमीटर‍के‍तल‍क्षेत्र‍में‍अााुीय‍घटक‍के‍जलए‍प्रदान‍ की‍जानी‍चाजूए, जजुमें‍अाश्यकतानुुार‍छूट‍दी‍जा‍ुकती‍ू।, ‍लाभकारी‍ईद्देश्यों‍के‍जलए‍ ुंगत‍प्राुंजगक‍भूजम‍ईपयजग‍के‍ऄनुुार‍लागू‍ूजगी। 19.11.1.7 जनजी‍भागीदारों‍के‍जलए‍पयावप्त‍लाभ‍ुुजनजित‍करत‍े ुएए, आु‍तरू‍की‍यजजनाओं‍के‍ुामाजजक‍ जाकाु‍के‍ईद्देश्यों‍की‍प्राथजमकता‍कज‍ुुजनजित‍करन‍े के‍जलए‍टीडीअर‍और/ऄथाा‍्ाूायवता‍ ग,प‍फंलडग‍ज,ुे‍ऄजभना‍जािपजीण‍तंत्र‍का‍ईपयजग‍दकया‍जा‍ुकता‍ू।, ‍आु‍ईद्देश्य‍के‍जलए‍ कइ‍यजजनाओं‍कज‍एक‍ुाथ‍जालय‍करने‍की‍ुंभााना‍की‍भी‍जांच‍की‍जा‍ुकती‍ू।, ‍ 19.11.1.8 जाजिष्ट‍जस्ट्थजतयों‍म‍ें ुमग्र‍्ापक‍यजजना‍बनान‍े के‍जलए‍अुपाु‍म‍ें जेज‍े ुाआटों‍के‍ुाथ‍ जबखरे‍ुएए‍भूखंडज‍कज‍एक‍ुाथ‍जमलाने‍की‍अाश्यकता‍ूज‍ुकती‍ू।, 19.12 ऄजनयजजजत‍औद्यजजगक‍क्षत्रे ों‍का‍पनु रूद्धार 19.12.1 जनयजजजत‍औद्यजजगक‍क्षेत्रों‍के‍ऄलााा, रा.रा.क्षे.‍ददल्ली‍ुरकार‍ने‍पुनर्नाकाु‍के‍जलए‍ऄुंगत‍क्षेत्रों‍म‍ें औद्यजजगक‍ुंकेन्द्रण‍के‍कलस्ट्टरों‍कज‍ऄजधुूजचत‍दकया‍ू‍, (ऄनुलग्नक‍9)।‍ऐुे‍ुमूूों‍में‍70%‍ु‍े ऄजधक‍प्लॉटों‍ में‍औद्यजजगक‍गजतजाजधयााँ‍ूजती‍ू।ैं 19.12.2 पुनर्नाकाु‍प्रदक्रया‍में‍ुड़कों‍कज‍चौडा‍करन,े ुेााओं‍कज‍मुूय, ा‍कराने, खुली‍जगू‍के‍जाकाु, पार्ककग‍अदद‍ के‍जलए‍पुनर्नाकाु‍यजजना‍त,यार‍करना‍िाजमल‍ू।, 19.12.3 ्ााूाररक‍रूप‍म,ें ये‍क्षेत्र‍ुेााओं‍के‍ुंदभ‍व म‍ें कम‍ू,ैं और‍पयावारण‍कज‍खतरे‍में‍ऄजधक‍डालते‍ू।ैं ‍ऐुे‍क्षेत्रों‍ के‍पुनर्नाकाु‍कज‍स्ट्पष्ट‍रूप‍ुे‍पररभाजीत‍मानदंडों‍के‍अधार‍पर‍करने‍की‍अाश्यकता‍ू,, स्ट्ााजमयों/‍ ईद्यजमयों‍की‍भागीदारी‍के‍ुाथ‍अाश्यक‍बुजनयादी‍ढााँच‍े के‍प्रााधान‍के‍बारे‍म‍ें ईद्यजगों‍के‍प्रकारों‍कज‍एक‍ ्ाजस्ट्थत‍तरीके‍ुे‍ऄनुमजत‍दी‍जा‍ुकती‍ू,, जज‍स्ट्थाजनक‍जनयजजन‍मानदंडों‍और‍पयावारण‍ुे‍ुंबंजधत‍ितों‍ के‍ुंदभव‍में‍ूज। 19.12.4 मौजूदा‍ाास्ट्तजाकताओं, ुाथ‍ूी‍ुाथ‍जनयजजजत‍जाकाु‍की‍ऄजनाायवताओं‍कज‍्यान‍में‍रखते‍ुएए, ऄुंगत‍ क्षेत्रों‍में‍औद्यजजगक‍ुंकेन्द्रण‍के‍क्लस्ट्टरों‍के‍पनु र्नाकाु‍के‍जलए‍जनम्नजलजखत‍मानदंड‍लागू‍ूोंगेः[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 135 i) ऄुंगत‍कलस्ट्टरों‍के‍औद्यजजगक‍ुंकेन्द्रण‍के‍न्यनू तम‍4 ूक्े टेयर‍म‍ें फ,ल‍े ुमाती‍क्षेत्र‍के‍जलए, जजुमें‍ औद्यजजगक‍गजतजाजध/ईपयजग‍के‍तूत‍क्लस्ट्टर‍के‍भीतर‍70%‍ुे‍ऄजधक‍प्लॉट‍ू,ैं ईन्ू‍ेंाास्ट्तजाक‍ुाेक्षणों‍के‍ अधार‍पर‍पनु र्नाकाु‍के‍जलए‍जाचार‍दकया‍जा‍ुकता‍ू।, ‍रा.रा.क्षे.‍ददल्ली‍ुरकार‍द्वारा‍आु‍तरू‍के‍ क्लस्ट्टरों‍की‍ऄजधुूचना‍के‍बाद, पुनर्नाकाु‍यजजना‍ुंबंजधत‍स्ट्थानीय‍जनकाय/भूजम‍का‍स्ट्ााजमत्ा‍रखने‍ााली‍ एजेंुी‍द्वारा‍त,यार‍की‍जाएगी। ii) क्लस्ट्टर‍की‍कम‍ु‍ेकम‍18‍मीटर‍की‍मागावजधकार‍ुड़क‍ु‍ेुीधी‍पुएचं ‍ूजनी‍चाजूए। iii) पुनर्नाकाु‍यजजना, प्रदीू ण‍जनयंत्रण‍और‍पयावारण‍प्रबंधन, ुेााओं‍के‍जाकाु, पार्ककग‍और‍रखरखाा‍की‍ त,यारी‍कज‍ुुजाधाजनक‍बनाने‍के‍जलए‍ुजुाआटी‍और‍ऐुी‍दकुी‍ऄन्य‍ुंस्ट्था‍का‍गठन‍करना‍ऄजनाायव‍ ूजगा। iv) डीपीुीुी‍ुे‍केाल‍ऄनापजि‍प्राप्तकताव‍ऄनुमेय‍ईद्यजगों‍कज‍ूी‍ऄनुमजत‍प्रदान‍की‍जाएगी। v) पुनर्नाकाु‍के‍जलए‍प्लॉटों‍के‍ुमामेलन‍और‍पुनगवठन‍की‍ऄनुमजत‍ूजगी। vi) ुभी‍आकाआयों‍कज‍ुांजाजधक‍मंजूरी‍प्राप्त‍करनी‍ूजगी।‍औद्यजजगक‍आकाआयों‍के‍ऄलग-ऄलग‍जबजली‍कनेक्िन‍ ूोंगे। vii) ऄन्य‍ितों‍म‍ेंिाजमल‍ू:ैं क. लगभग‍10%‍क्षेत्र‍कज‍ुकुवलिे न/ुड़कों/ुर्नाु‍लने ‍के‍जलए‍अरजक्षत‍रखा‍जाना‍चाजूए। ख. लगभग‍10%‍ऄध-व प्राेियजग्य‍ुतू‍कज‍पार्ककग‍और‍लजलडग/ऄनलजलडग‍क्षेत्रों‍के‍जलए‍रखा‍जाना‍ चाजूए। ग. क्लस्ट्टर‍क्षेत्र‍का‍लगभग‍8%‍पाकव/ूररत‍क्षेत्रों‍के‍जलए‍अरजक्षत‍ूजना‍चाजूए। घ. मानदंडों‍के‍ऄनुुार‍ुीइटीपी, ईप-स्ट्टेिनों, पंप‍ूाईु, फायर‍स्ट्टेिन, पुजलु‍पजस्ट्ट‍अदद‍ज,ुी‍ बुजनयादी‍ुुजाधाओं‍की‍अाश्यकताओं‍के‍जलए‍कुल‍क्षेत्र‍का‍लगभग‍10%‍अरजक्षत‍ूजना‍चाजूए। ङ. लगभग‍3%‍क्षेत्र‍्ााुाजयक‍ईपयजग‍के‍जलए‍ऄनुमेय‍ूजगा। च. ददल्ली‍जल‍बजडव/ुेंरल‍ग्राईंड‍ाॉटर‍ऄथॉररटी‍(जूा‍ं भी‍अाश्यक‍ूज)‍द्वारा‍पंलपग‍स्ट्टेिनों, भंडारण‍ टैंकों, भूजल‍ररचार्मजग/ाीा‍व जल‍ुंचयन‍के‍जलए‍अाश्यकता‍के‍ऄनुुार‍पानी‍की‍अपूर्नत‍की‍ यजजना‍बनाना‍और‍जल‍जनकाुी‍यजजना‍त,यार‍करना। छ. 100‍ागवमीटर‍ुे‍ऄजधक‍के‍प्लॉटों‍की‍न्यूनतम‍9.0‍मीटर‍मागावजधकार‍तक‍पुएचं ‍ूजनी‍चाजूए; और‍100‍ागवमीटर‍ुे‍कम‍के‍प्लॉटों‍की‍न्यूनतम‍7.5‍मीटर‍मागावजधकार‍तक‍पुएचं ‍ूजनी‍चाजूए। ज. ुामान्य‍पार्ककग‍60 ागवमीटर‍ुे‍नीच‍े के‍प्लॉटों‍के‍जलए‍प्रदान‍की‍जानी‍चाजूए‍और‍लअे ईट‍ यजजना‍में‍आु‍े जनधावररत‍दकया‍जाना‍चाजूए, जबदक‍पार्ककग‍और‍लजलडग‍तथा‍ऄनलजलडग‍के‍जलए,136 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] न्यूनतम‍3 मीटर‍के‍फ्रंट‍ुेटब,क‍कज‍60 ागवमीटर‍ुे‍उपर‍के‍प्लॉटों‍ूते ‍ु जबना‍चार‍दीाारी‍के‍प्रदान‍ दकया‍जाएगा। झ. ा,कजल्पक‍ तौर‍ पर, ुजुायटी‍ डीुीएन‍ म‍ें जनधावररत‍ भूजम‍ जातरण‍ के‍ अधार‍ पर‍ लेअईट‍ यजजना/पुनर्नाकाु‍यजजना‍त,यार‍करने‍के‍जाकल्प‍कज‍ऄपना‍ुकती‍ू।, ‍ viii) ऄन्य‍ प्रााधान/जाकाु‍ जनयंत्रण‍ मानदंड‍ यथा‍ जनधावररत‍ लागू‍ ूोंगे।‍ जमीनी‍ जस्ट्थजतयों‍ के‍ अधार‍ पर, दद.जा.प्रा.‍की‍तकनीकी‍ुजमजत‍10%‍तक‍की‍छूट‍मापदंडों‍म‍ेंदे‍ुकती‍ू।, नजटः‍12.4.7 (ए, बी, ुी, डी)‍में‍ईजल्लजखत‍ये‍ुुजाधाएं‍प्रदान‍की‍जाएंगी, जज‍औद्यजजगक‍क्लस्ट्टर‍के‍भीतर‍ऄथाा‍ अुपाु‍के‍क्षेत्र‍म‍ेंभूजम‍की‍ईपलब्धता‍की‍ितव‍के‍अधार‍पर‍ू।ैं 19.12.5 पुनरूद्धार‍कायव‍ुजुाआटी‍द्वारा‍स्ट्ाेच्छा‍ुे, ऄथाा‍ुंबंजधत‍स्ट्थानीय‍जनकाय/एजेंजुयों‍द्वारा‍दकया‍जा‍ुकता‍ ू।, ‍यदद‍एजेंजुयां‍पुनर्नाकाु‍का‍कायव‍करती‍ूैं, तज‍ाे‍प्रत्यक्ष‍तौर‍पर‍एकल‍ईद्यजगों‍ुे‍प्रभार‍ाुूलगें ी।‍भूजम‍ ईपयजग‍म‍ें पररातवन, बढ़ी‍ुएइ‍एफएअर‍और‍भूजम (जूां‍भी‍लाग‍ू ूज)‍म‍ें पररातवन‍के‍जलए‍अाश्यक‍िुल्क‍ का‍भुगतान‍ुंबंजधत‍एजेंुी‍कज‍करना‍ूजगा। 19.12.6 यजजना‍की‍ऄजधुूचना‍के‍2 ाीव‍की‍ऄाजध‍के‍भीतर‍पुनरूद्धार‍यजजना‍त,यार‍की‍जाएगी।‍यजजना‍के‍ ऄनुमजदन‍के‍बाद‍यजजना‍3 ाीव‍की‍ुमयााजध‍के‍भीतर‍पूरी‍की‍जाएगी।‍क्लस्ट्टर, जज‍जनर्ददष्ट‍ुमय-ऄाजध‍ के‍ भीतर‍ पनु र्नाकाु‍ प्रस्ट्तााों‍ कज‍ पूरा‍ करन‍े में‍ जाफल‍ रूते‍ ू,ैं ईन्ू‍ें ऄन्य‍ ुंगत‍औद्यजजगक‍ क्षेत्रों‍ म‍ें स्ट्थानांतररत‍करना‍ूजगा, और‍ऄुंगत‍क्लस्ट्टरों‍में‍कायव‍करने‍ााली‍आकाआयों‍कज‍बंद‍करना‍ूजगा।‍ऐु‍े मामलों‍म,ें लाआुेंलुग‍प्राजधकरण‍ुक्षम‍प्राजधकारी‍ु‍े भूजम‍ईपयजग‍की‍मंजूरी‍प्राप्त‍दकए‍जबना, औद्यजजगक‍ आकाआयों‍कज‍लाआुेंु‍नाीनीकरण/जारी‍नूीं‍करेगा।‍भूजम‍ईपयजग‍की‍मंजूरी‍जलए‍जबना, ऄुंगत‍क्षेत्रों‍म‍ें कजइ‍नया‍लाआुेंु‍जारी‍नूीं‍दकया‍जाएगा। 19.12.7 जनम्नजलजखत‍क्षेत्र‍औद्यजजगक‍क्लस्ट्टर‍पुनर्नाकाु‍यजजना‍के‍जलए‍पात्र‍नूीं‍ूोंगेः‍बंगला‍जजन‍(नइ‍ददल्ली‍और‍ जुजाल‍लाआंु), ररज, ररार‍बेड‍(जजन-ओ), जलाियों‍के‍ुाथ‍लग‍े क्षेत्र, नूर, ुुरक्षा‍के‍दजृ ष्टकजण‍ु‍े ुंाेदनिील‍क्षेत्र, ुंरक्षण‍और‍जाराुत‍क्षेत्र, अरजक्षत/ुंरजक्षत‍ान, दद.जा.प्रा.‍फ्ल,ट्‍ु, ुूकारी‍ुमूू‍ अााुीय‍ुजुायटी, ुरकारी‍फ्ल,ट/बंगले/जनयजि ा‍अााु‍अदद, और‍आनुे‍ुटे‍ऄन्य‍क्षेत्र। 19.13 ऄुगं त‍क्षत्रे ों‍म‍ेंगजदाम‍क्लस्ट्टरों‍के‍पनु र्नाकाु‍ूते ‍ुमानदडं 19.13.1 ददल्ली‍राष्ट्रीय‍राजधानी‍राज्यक्षेत्र‍जाजध‍(जािेी‍खंड)‍जद्वतीय‍ऄजधजनयम-2011 में‍''ग्रामीण‍क्षेत्रों‍में‍कृजी‍ भूजम‍पर‍जनर्नमत‍स्ट्कूलों, औीधालयों, धार्नमक‍ुंस्ट्थानों, ुांस्ट्कृजतक‍ुंस्ट्थानों, भंडार, ाेयरूॉईु‍और‍कृजी‍ आन्पुट‍ऄथाा‍ईपज‍(डेयरी‍और‍मगु ी‍पालन‍ुजूत)‍के‍जलए‍ईपयजग‍दकए‍जान‍े ााल‍े गजदामों‍के‍बारे‍म‍ें ्ाजस्ट्थत‍तौर‍पर‍प्रबंधन‍ूते ु‍नीजत‍ऄथाा‍यजजना‍और‍मौजदू ा‍गजदाम‍ुमूूों,‍जज‍दक‍राष्ट्रीय‍राजधानी‍क्षत्रे ‍ ददल्ली‍के‍लजगों‍की‍जरूरतों‍कज‍पूरा‍करने‍के‍जलए‍अाश्यक‍ू,, ‍के‍पुनर्नाकाु‍ूते ु‍ददिा-जनदेि‍(ग,र-कृजी‍ ास्ट्तुओं‍के‍भंडारण‍ूते ु)''‍का‍भी‍प्रााधान‍ू।,[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 137 19.13.2 ददल्ली‍के‍ग्रामीण‍क्षेत्र‍में‍बड़ी‍ुंख्या‍में‍गजदाम, खाद्यान्न, पत्थर‍और‍ऄन्य‍ुामान‍के‍गजदाम‍ऄजस्ट्तत्ा‍म‍ेंअए‍ ू‍ैं जज‍पूावाती‍दद.म.ुयज.‍म‍ें नूीं‍थ‍े ज,ुे‍दक‍गांा‍का‍लाल‍डजरा, जास्ट्ताररत‍लाल‍डजरा‍अदद।‍ददल्ली‍राष्ट्रीय‍ राजधानी‍राज्यक्षेत्र‍जाजध‍(जािेी‍खडं )‍ऄजधजनयम 2007‍कज‍ाीव‍2023‍तक‍नीजत‍का‍जनमावण‍करने‍ूते ‍ु जास्ट्ताररत‍दकया‍गया‍ू।, ‍जनम्नजलजखत‍मानदडं ‍स्ट्टैंड‍ऄलजन‍एां‍गजदाम‍क्लस्ट्टर‍के‍जलए‍लागू‍ूोंगे। i) स्ट्टैंड‍ऄलजन‍गजदामः‍स्ट्टैंड‍ऄलजन‍गजदाम‍प्लॉट, जज‍बड़े‍क्लस्ट्टरों‍का‍जूस्ट्ुा‍नूीं‍बनते‍ू,ैं जनम्नजलजखत‍ितों‍के‍ुाथ‍िाजुत‍ूोंगे।‍ ii) स्ट्टैंड-ऄलजन‍गजदामों‍(गर, ‍प्रदीू णकारी/गर, ‍खतरनाक‍ुामग्री‍के‍भंडारण)‍कज‍न्यूनतम‍30‍मीटर‍ मागावजधकार‍(मागावजधकार)‍पर‍ऄनुमजत‍दी‍जाएगी। iii) ग्राम‍ऄबादी‍(लालडजरा‍क्षेत्र)‍और‍जास्ट्ताररत‍लालडजरा‍क्षेत्रों‍में‍ग,र-प्रदीू णकारी/ग,र-खतरनाक‍ ुामजग्रयों‍के‍भंडारण‍गजदामों‍की‍ऄनुमजत‍दी‍जाएगीः क) 300‍ागवमीटर‍तक‍के‍प्लॉट‍के‍अकार‍के‍ुाथ‍9‍मीटर‍मागावजधकार‍(राजस्ट्ा‍जाभाग‍ द्वारा‍ुड़क‍कज‍पररभाजीत/ऄनमु जददत‍दकए‍जाने‍के‍मामले‍में‍7.5‍मी।)‍ ख) 300‍ागवमीटर‍ुे‍ऄजधक‍अकार‍के‍प्लॉट‍ूते ‍ु 12‍मी‍मागावजधकार। iv) आन‍गजदामों‍कज‍प्लॉट‍के‍भीतर‍पार्ककग‍अाश्यकताओं‍की‍पर्नू त‍के‍जलए‍ऄनुमजत‍दी‍जाएगी, बिते‍दक‍ददल्ली‍र,दफक‍पुजलु‍और‍रा.रा.क्षे.‍ददल्ली‍ुरकार‍की‍ददल्ली‍ऄजग्निमन‍ुेााओं‍ुे‍ एनओुी‍प्राप्त‍की‍गइ‍ूज।‍ v) प्लॉट‍के‍भीतर‍ााूनों‍पर‍लजलडग/ऄनलजलडग‍की‍ुुजाधा‍प्रदान‍की‍जाएगी। vi) स्ट्टैंड‍ऄलजन‍गजदामों‍के‍माजलकों‍कज‍जनजित‍ुमय-ऄाजध‍ूते ‍ु यजजनाओं‍की‍मंजूरी‍लेनी‍ूजगी।‍ ऄुंगत‍क्षेत्रों‍में‍अने‍ााले‍प्लॉटों‍के‍माजलकों‍और‍30 मीटर‍ुे‍कम‍मागावजधकार‍पर‍जस्ट्थत‍ मौजूदा‍ गजदामों‍ कज‍ ददनांक‍ 31.12.2023 तक‍ ऄन्य‍ ुंगत‍ क्षेत्रों/गजदाम‍ क्लस्ट्टरों‍ म‍ें स्ट्थानांतररत‍करना‍ूजगा।‍ऄुगं त‍क्षेत्रों‍म‍ें कायवरत‍ऐु‍े गजदामों‍कज‍ईपरजि ‍ुमय-ऄाजध‍के‍ भीतर‍बंद‍करना‍ूजगा। 19.13.3 ऄुंगत‍गजदाम‍क्लस्ट्टरः‍ाास्ट्तजाक‍ुाेक्षणों‍के‍अधार‍पर, पूचान‍दकए‍गए‍क्षेत्र‍का‍पनु रूद्धार‍के‍जलए‍ गजदाम/ाेयरूाईलुग‍गजतजाजधयों‍के‍ऄुंगत‍क्लस्ट्टरों‍पर‍जाचार‍दकया‍जा‍ुकता‍ू,, जज‍न्यूनतम‍2 ूक्े टेयर‍ के‍ुजन्नजूत‍क्षेत्र‍म‍ेंऄाजस्ट्थत‍ू‍,और‍जजनम‍ेंक्लस्ट्टरों‍के‍भीतर‍प्लॉटों‍का‍55%‍ुे‍ऄजधक‍ुंकेन्द्रण‍ू।, 19.13.4 स्ट्थानीय‍जनकायों/रा.रा.क्षे.‍ददल्ली‍ुरकार‍द्वारा‍आु‍तरू‍के‍ुमूूों‍की‍ऄजधुूचना‍के‍बाद, पुनरूद्धार‍ यजजना‍कज‍ुजुाआटी‍(भूजम‍माजलकों‍द्वारा‍गरठत)‍द्वारा‍जनम्नजलजखत‍मानदडं ों/ितों‍के‍अधार‍पर‍त,यार‍ दकया‍जाना‍चाजूए, और‍ईुके‍बाद‍ुंबंजधत‍स्ट्थानीय‍जनकाय‍ुे‍ऄनुमजदन‍प्राप्त‍करना‍चाजूए। i) क्लस्ट्टर‍म‍ेंन्यूनतम‍30‍मीटर‍मागावजधकार‍की‍ुड़क‍ुे‍ुीधी‍पुएचं ‍ूजनी‍चाजूए।‍ ii) पुनरूद्धार‍यजजना/यजजना‍त,यार‍करने, ुेााओं‍के‍जाकाु, पार्ककग‍और‍रखरखाा, प्रदीू ण‍जनयंत्रण‍और‍ पयावारण‍प्रबंधन‍की‍ुुजाधाओं‍ूते ु‍ुमूू‍ऄथाा‍ुजुाआटी‍का‍गठन‍ऄजनाायव‍ूजगा।‍ iii) यजजना‍क्षेत्र‍के‍ऄंतगवत‍पुनरूद्धार‍ूते ‍ु प्लॉटों‍के‍ुमामेलन‍और‍पुनगवठन‍की‍ऄनुमजत‍ूजगी।‍138 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] iv) गजदामों‍के‍माजलकों‍कज‍जूां‍भी‍अाश्यक‍ूज, ुंबंजधत‍एजेंजुयों‍ुे‍ऄपेजक्षत‍ुांजाजधक‍स्ट्ाीकृजत‍प्राप्त‍ करनी‍ूजगी।‍ुजुाआटी‍द्वारा‍पुनरूद्धार‍के‍जलए‍लेअईट‍यजजना‍की‍मंजूरी‍प्राप्त‍करने‍के‍ईपरान्त, स्ट्थानीय‍जनकाय‍ुे‍प्रस्ट्ताा‍प्राप्त‍ूज‍जाने‍पर, पूचान‍दकए‍गए‍ुमूूों‍कज‍भूजम‍ईपयजग‍के‍पररातवन‍के‍ जलए‍प्रदक्रयागत‍दकया‍जाएगा। v) ऄन्य‍ितों‍म‍ेंिाजमल‍ूोंगेः क. लगभग‍10%‍क्षेत्र‍कज‍ुकुवलिे न‍/‍ुड़कों‍/‍ुर्नाु‍लेन‍के‍जलए‍अरजक्षत‍रखा‍जाना‍चाजूए।‍ ख. लगभग‍10%‍ऄध-व प्राेियजग्य‍ुतू‍कज‍ुाझ‍े पार्ककग, जस्ट्थर‍पार्ककग, और‍लजलडग/ऄनलजलडग‍क्षेत्रों‍ के‍जलए‍रखा‍जाना‍चाजूए। ग. मानदंडों‍के‍ऄनुुार, ुंबंजधत‍बुजनयादी‍ढांचे‍की‍अाश्यकता‍के‍जलए‍लगभग‍10%‍क्षत्रे ‍कज‍ अरजक्षत‍दकया‍जाना‍चाजूए, ज,ुे‍दक‍आलेजक्रक‍ुब-स्ट्टेिन, फायर‍स्ट्टेिन, पुजलु‍पजस्ट्ट, ुर्नालुग, लॉलजग,‍बजर्मडग, और‍ऄनौपचाररक‍बाजार‍क्षेत्र‍अदद‍के‍जलए। घ. ददल्ली‍जल‍बजडव/केन्द्रीय‍भूजल‍प्राजधकरण‍(जूां‍भी‍अाश्यक‍ूज)‍द्वारा‍पंलपग‍स्ट्टेिनों,‍भडं ारण‍ टैंकों,‍भूजल‍पुनभरव ण/ाीाव‍जल‍ुंचयन‍और‍जल‍जनकाुी‍यजजना‍के‍ुाथ‍जलापूर्नत‍ूते ु‍यजजना‍ त,यार‍करना।‍ ङ. लगभग‍8%‍क्षत्रे ‍कज‍पाकव/ूररत‍क्षेत्रों‍के‍जलए‍अरजक्षत‍रखा‍जाना‍चाजूए। च. प्लॉट‍के‍भीतर‍इएुएु, भूजमगत‍जल‍भडं ारण‍टैंक, ाीाव‍जल‍ुंचयन‍प्रणाली, ुौर‍ताप/प्रकाि‍ ्ास्ट्था‍अदद‍ज,ुी‍ईपयजगी‍ुुजाधाएं‍प्रदान‍की‍जाएंगी।‍ छ. यजजना‍के‍ऄंतगवत‍ुभी‍प्लॉटों‍का‍न्यूनतम‍12‍मीटर‍मागावजधकार‍ुे‍ुीधी‍पुएचं ‍ूजनी‍चाजूए।‍ ज. ऄन्य‍प्रााधान‍/‍जाकाु‍जनयंत्रण‍यथा‍जनर्ददष्ट‍मानदडं ‍के‍ऄनुु ार‍लागू‍ूोंगे। नजटः‍ईपरजि ‍v) (ए, बी, ुी, इ)‍म‍ेंईजल्लजखत‍आन‍ुुजाधाओं‍ूते‍ुभूजम‍की‍ईपलब्धता‍के‍ऄधीन‍गजदाम‍ क्लस्ट्टर‍के‍भीतर‍ऄथाा‍आुके‍अुपाु‍के‍क्षेत्र‍पर‍जाचार‍दकया‍जाएगा। vi) ुरकार‍द्वारा‍ुमय-ुमय‍पर‍(जूां‍भी‍लागू‍ूज)‍जनर्ददष्ट‍दकए‍गए‍ऄपेजक्षत‍पररातनव ‍िल्ु क‍और‍दकुी‍ ऄन्य‍िुल्क‍का‍भुगतान‍ुंबंजधत‍प्राजधकारी‍कज‍करना‍ूजगा। vii) एकल‍क्लस्ट्टरों‍की‍पुनरूद्धार‍यजजनाएं‍ुजुाआटी‍द्वारा‍त,यार‍की‍जानी‍चाजूए, और‍ईुके‍बाद‍ुंबंजधत‍ स्ट्थानीय‍प्राजधकरण/एमुीडी‍द्वारा‍ऄनुमजददत‍की‍जानी‍चाजूए।‍यजजनाओं‍के‍ऄनुमजदन‍की‍तारीख‍ु‍े तीन‍ुाल‍के‍भीतर‍पुनर्नाकाु‍कज‍पूरा‍दकया‍जाना‍चाजूए। viii) क्लस्ट्टर, जज‍ईपरजि ानुुार‍जनर्ददष्ट‍ुमय-ऄाजध‍के‍भीतर‍पनु र्नाकाु‍प्रस्ट्तााों‍कज‍पूरा‍करने‍में‍जाफल‍ रूते‍ू,ैं ईन्ू‍ें ऄन्य‍ुंगत‍औद्यजजगक‍क्षेत्रों‍म‍ें स्ट्थानांतररत‍करना‍ूजगा, और‍ऄुंगत‍क्लस्ट्टरों‍म‍ें काय‍व करने‍ााले‍ऐुे‍गजदामों‍कज‍बंद‍करना‍ूजगा।‍ऐुे‍मामलों‍में, लाआुेंलुग‍प्राजधकरण‍ुक्षम‍प्राजधकारी‍ुे‍ भूजम‍ईपयजग‍की‍मंजूरी‍प्राप्त‍दकए‍जबना, ऐुे‍गजदामों‍कज‍लाआुेंु‍नाीनीकरण/जारी‍नूीं‍करेगा।‍आुके‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 139 ऄजतररि ‍भूजम‍ईपयजग‍की‍मंजरू ी‍प्राप्त‍दकए‍जबना,‍ऄुंगत‍क्षत्रे ों‍में‍कजइ‍नया‍लाआुेंु‍जारी‍नूीं‍दकया‍ जाएगा। 19.13.5 ऄन्य‍ित ें 19.13.5.1 यूबीबीएल‍2016‍की‍ताजलका‍3.2‍के‍ऄनुुार‍जजजखम‍अधाररत‍ागीकरण‍कज‍िाजमल‍करन‍े ााल‍े गजदाम‍प्लॉट‍ूते ु‍जाकाु‍जनयंत्रण‍मानदडं ‍जनम्नानुुार‍ूोंगेः प्लॉट‍का‍अकार ऄजधकतम‍ग्राईंड‍ ऄजधकतम‍ ऄजधकतम‍उंचाइ पार्ककग (ाग‍वमीटर‍म)ें कारेज‍(%) एफएअर 500‍तक 70 140 15 मी.‍ुे‍नीच े 300‍ ागवमीटर‍ तक‍ 500‍ुे‍उपर‍-‍ 60 120 15 मी.‍ुे‍नीच े के‍प्लॉटों‍के‍मामल‍े में‍ ुाझा‍ पार्ककग‍ 2000 प्रदान‍की‍जाएगी। 2000‍ुे‍उपर‍-‍ 50 100 15 मी.‍ुे‍नीच े 300‍ ाग‍व मीटर‍ ुे‍ 10,000‍तक उपर‍के‍प्लॉटों‍ूते ‍ु 10,000 ुे‍उपर 40 80 15 मी.‍ुे‍नीच े 3‍ इुीएु/ 100‍ ागवमीटर‍ का‍ तल‍ क्षेत्र। रटप्पजणया:ं 1. जूां‍कूीं‍भी‍भान‍जनमावण‍जाजनयम‍जाजभन्न‍श्रेजणयों‍के‍प्लॉटों‍के‍जलए‍प्रदान‍दकए‍गए‍ू,ैं ाूां‍कार‍दकया‍गया‍ क्षेत्र‍और‍तल‍क्षेत्र‍दकुी‍भी‍जस्ट्थजत‍में‍जनचली‍श्रेणी‍में‍प्लॉटों‍के‍ुबुे‍बड़े‍अकार‍के‍जलए‍क्रमिः‍ऄनुमेय‍कार‍ क्षेत्र‍और‍तल‍क्षेत्र‍ुे‍कम‍नूीं‍ूजगा। 2. यूबीबीएल‍2016‍और‍ददल्ली‍ऄजग्न‍िमन‍ुेाा‍ऄजधजनयम‍के‍ऄनुुार‍जजजखम‍अधाररत‍ागीकरण‍पर‍अधाररत‍ ऄजग्न‍ुुरक्षा‍मानदडं ों‍के‍ऄनरूु प‍ूजने‍चाजूए। 3. ुाझे‍ पार्ककग‍ कज‍ 300‍ ागवमीटर‍ अकार‍ तक‍ के‍ प्लॉटों‍ के‍ जलए‍ प्रदान‍ दकया‍ जाएगा, और‍ पार्ककग‍ और‍ लजलडग/ऄनलजलडग‍प्रयजजनों‍के‍ईपयजग‍ूते ‍ु चारदीाारी‍के‍जबना‍फ्रंट‍ुेटब,क‍प्रदान‍दकया‍जाएगा। 4. 300‍ागवमीटर‍ुे‍ऄजधक‍के‍प्लॉटों‍के‍जलए‍माजलकों‍द्वारा‍ईनके‍प्लॉटों‍के‍भीतर‍पार्ककग‍और‍लजलडग/ऄनलजलडग‍ के‍प्रााधान‍दकए‍जाएंगे। 5. बेुमेंट‍का‍प्रााधान/ईपयजग‍दद.मु.यज.-2021‍में‍जनर्ददष्ट‍ितों‍के‍ऄनुुार‍ूजगा। 6. ुांजाजधक‍जनकायों‍ुे‍मजूंरी‍के‍ऄधीन‍गजदाम‍पररुर‍के‍भीतर‍गजदाम‍गजतजाजध‍ु‍े ुंबंजधत‍कायवक्षेत्र/कायावलय‍ (ऄनुमेय‍एफएअर‍के‍25% ुे‍ऄजधक‍नूीं)‍ूते ‍ु एक‍स्ट्थायी‍ुरं चना‍की‍ऄनुमजत‍दी‍जाएगी, जज‍धूल‍और‍प्रदीू ण‍ जनयंत्रण‍की‍ईजचत‍्ास्ट्था‍की‍ित‍व के‍ुाथ‍ूजगी।140 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 19.13.5.2 िेी‍प्लॉट‍माजलकों‍कज‍दद.म.ुयज./यूबीबीएल/नीजत‍ददिाजनदेिों‍में‍जनधावररत‍प्रााधानों‍के‍ऄनुु ार, और‍ ुभी‍ुांजाजधक‍जनकायों‍ुे‍मंजूरी/ऄनुमजत‍प्राप्त‍करने‍के‍बाद, मौजूदा‍ईपयजग‍के‍ुाथ‍जारी‍रखन‍े ऄथाा‍गजदामों‍में‍पररातवन‍ऄथाा‍दकुी‍भी‍ऄनुमेय‍ईपयजग‍की‍ऄनुमजत‍दी‍जाएगी। 19.13.5.3 आन‍ददिाजनदिे ों‍के‍ऄतं गतव ‍ुभी‍पुनरूद्धार‍यजजनाएं, ुभी‍ुांजाजधक‍प्रााधानों‍और‍ ‍की‍ ितों/यूबीबीएल‍2016‍के‍ऄनरूु प‍ूोंगी। 19.13.5.4 ुंबंजधत‍स्ट्थानीय‍जनकाय‍और‍जूतधारक‍जनधावररत‍िल्ु कों/प्रभारों‍की‍ाुूली‍के‍जलए‍प्रणाली‍त,यार‍करन‍े का‍कायव‍करेंगे। 19.13.5.5 ुड़क‍कज‍चौडा‍करन‍े के‍जलए‍भूजम‍के‍प्रत्यापवण/ुरेंडर‍के‍मामले‍में, मूल‍प्लॉट‍का‍एफएअर‍ऄनुमेय‍ ूजगा। 19.13.5.6 आन‍जाजनयमों‍के‍कायावन्ायन‍कज‍स्ट्थानीय‍जनकाय‍द्वारा‍ईपयजगकताव‍के‍ऄनुकूल‍मागवदर्निका‍के‍जूस्ट्ुे‍के‍ रूप‍में‍प्रस्ट्तुत‍दकया‍जा‍ुकता‍ू,, जजुमें‍ऐुी‍पररयजजनाओं‍के‍जलए‍ऄक्ुर‍पछू े‍जाने‍ााले‍प्रश्न‍ (एफएक्यू)‍िाजमल‍ू।ैं 19.13.5.7 जनम्नजलजखत‍क्षेत्र‍गजदाम‍क्लस्ट्टरों‍के‍पुनरूद्धार‍यजजनाओं‍के‍जलए‍पात्र‍नूीं‍ूोंगेः‍बंगला‍क्षेत्र‍(नइ‍ ददल्ली‍और‍जुजाल‍लाआंु), ररज, ररार‍बेड‍(जजन-ओ), जलाियों‍के‍ुाथ‍लगे‍क्षेत्र, नूर, ुुरक्षा‍के‍ दजृ ष्टकजण‍ु‍े ुंाेदनिील‍क्षेत्र, ुंरक्षण‍और‍जाराुत‍क्षेत्र, अरजक्षत/ुंरजक्षत‍ान, दद.जा.प्रा.‍फ्ल,ट्‍ु, ुूकारी‍ग्रुप‍ूाईलुग‍ुजुायटी, ुरकारी‍फ्ल,ट/बगं ल/ेजनयजि ा‍अााु‍अदद, और‍आनुे‍ुटे‍ऄन्य‍ क्षेत्र। --- x --- x ---- x --- x --- ऄ्याय कजड 20.0 पारगमन‍ईन्मखु ‍जाकाु DEV4 4 20.1.1 ‍पारगमन‍ ईन्मुख‍ जाकाु‍ [रांजजट-ओररएंटेड‍ डेालपमेंट‍ (टीओडी)]‍ एक‍ ऄजभना‍ िूरी‍पररप्रेक्ष्य‍ ू‍, जजुम‍ें ुाावजजनक‍पारगमन‍के‍मौजूदा‍और‍अगामी‍बुजनयादी‍ढांच‍े तथा‍ुंबद्ध‍ईपयजगकताओंव ‍की‍बड़ी‍ुंख्या‍के‍ मा्यम‍ुे‍लाभ‍प्राप्त‍करना‍िाजमल‍ू‍, जजुुे‍जनरंतर‍अाा-जाूी‍की‍्ास्ट्था‍ुुजनजित‍ूज‍ुके‍और‍ुुुंबद्ध‍ जमजश्रत-ईपयजग‍जाकाु‍द्वारा‍भूजम‍का‍ुाोिम‍ईपयजग‍दकया‍जा‍ुके। 20.1.2 ‍ददल्ली‍म‍ें टीओडी‍दजृष्टकजण‍लजगों‍और‍नौकररयों‍कज‍बड़े‍प,माने‍पर‍पारगमन‍तंत्र‍के‍करीब‍लाने‍म‍ें मदद‍करेगा‍ तथा‍आुके‍पररणामस्ट्ारूप‍िूर‍म‍ें भूजम‍ईपयजग‍और‍परराून‍के‍बीच‍बुएत‍अाश्यक‍एकीकरण‍ुंभा‍ूज‍ ुकेगा।‍आुुे‍रांजजट‍स्ट्टेिनों‍के‍प्रभाा‍क्षेत्रों‍म‍ें ुुु ंबद्ध, चलन‍े यजग्य, जमजश्रत-ईपयजग‍के‍जाकाु‍काय‍व ूज‍ ुकेंगे।‍यू‍एक‍मूत्ापूणव‍पररप्रेक्ष्य‍‍बदलाा‍ू‍, जज‍ुंभात:‍ुाावजजनक‍पारगमन‍की‍ुााररयों‍की‍ुंख्या‍म‍ें ाृजद्ध‍कर‍ुकता‍ू,, ााूनों‍की‍भीड़‍कज‍कम‍कर‍ुकता‍ू‍, और‍दीघवकाजलक‍ुंदभव‍म‍ें ग्रीनूाईु‍ईत्ुजवन‍और‍ प्रदीू ण‍कज‍कम‍कर‍ुकता‍ू।,[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 141 20.1.3 ‍टीओडी,‍िूर‍म‍ें ऄारुद्ध‍अर्नथक‍क्षमता‍और‍भूजम‍मूल्यों‍कज‍बेूतर‍बनाने‍की‍भी‍एक‍मूत्ापूणव‍कायवनीजत‍ू।, ‍ यू‍कायवनीजत‍ुाावजजनक‍क्षत्रे ‍म‍ें यजजनाबद्ध‍गून‍ईपयजग‍और‍कायवकलाप‍िुरू‍करके, नए‍बुजनयादी‍ढांच‍े के‍ प्रुार‍और ुुधार‍के‍ज़ररए‍िूर‍म‍ें चुलनदा‍नजड/क्षेत्रों‍के‍जाकाु/पुनःुुधार‍कज‍ुंभा‍बनाएगी।‍यू‍िूर‍कज‍ ुाावजजनक‍पारगमन‍के‍बुजनयादी‍ढांच‍े -‍मेरज‍रेल,‍क्षेत्रीय‍र,जपड‍रांजजट‍जुस्ट्टम‍(अरअरटीएु)‍अदद‍म‍ें दकए‍ जा‍रू‍े बड़े‍प,मान‍े पर‍जनाेि‍ु‍े लाभ‍कमाने‍का‍मौका‍देगी।‍ऐुा‍ऄनुकूल‍रूप‍ु‍े ऄाजस्ट्थत‍पारगमन‍नजड‍के‍ अुपाु‍पुराने‍अााु‍स्ट्टॉक‍म‍ें ुुधार‍करने‍के‍ुाथ-ुाथ‍नए‍अााु‍स्ट्टॉक‍और‍अर्नथक‍केंद्रों‍का‍जनमावण‍ करके‍तथा‍लाभ‍कमाने‍के‍ऄाुरों‍कज‍खजलकर‍दकया‍जाएगा। 20.1.4 ‍ददल्ली‍के‍जलए‍टीओडी‍पॉजलुी‍के‍मा्यम‍ु‍ेजनम्नजलजखत‍प्रमखु ‍पररणामों‍कज‍लजक्षत‍दकया‍जाएगा। 20.1.4.1 ‍ऄनकु ूल‍घनत्ा‍और‍ईपयजग‍और‍कायकव लाप‍का‍जाजाधीकरण: यू‍ईच्च‍एफएअर‍मानदंडों‍और‍ुुुंबद्ध‍ जमजश्रत‍ईपयजग‍के‍जाकाु‍ुे‍ुुगम‍ूजगा‍जजुमें‍ुेाा‍प्रदाता‍एजेंजुयों‍द्वारा‍बुजनयादी‍ढांचे‍का‍ जास्ट्तार‍दकया‍जाएगा और‍ूररत‍भानों‍तथा‍पयावारण‍ुंरक्षण‍के‍मानदडं ों‍कज‍लाग‍ू दकया‍जाएगा।‍ आु‍तरू‍के‍दजृ ष्टकजण‍ुे‍ुाावजजनक‍पारगमन‍प्रणाजलयों‍के‍जनकट‍कायवकलाप‍और‍नौकररयों‍के‍ईच्च‍ घनत्ा‍का‍ुाोिम‍जमजश्रत‍रूप‍ुामन‍े अएगा, आन‍क्षेत्रों‍की‍जाकाु‍क्षमता‍म‍ें ाृजद्ध‍ूज‍ुकेगी‍और‍ लाभ‍कमाने‍की‍ुुजाधा‍ूजगी। 20.1.4.2 ार्नधत‍अााजाूी‍: i) प,दल‍यात्री‍और‍गर, ‍मजटरीकृत‍परराून‍(एनएमटी)‍ऄनुकूल‍ााताारण‍-‍यातायात‍प्रबधं न‍ यजजनाओं, ुड़क-ुुधार, प,दल‍यात्री‍और‍एनएमटी‍मागों‍के‍बेूतरीन‍नेटाकव‍का‍जनमावण‍और‍ ुीजमत‍एां‍मूगं ी‍ुाावजजनक‍पार्ककग‍ज,ुी‍जाजभन्न‍कायवनीजतयों‍द्वारा‍प,दल‍चलने‍ाालों‍और‍ गर, ‍मजटरीकृत‍परराून‍कज‍ुाोच्च‍प्राथजमकता‍दी‍जाती‍ू।, ii) परराून‍के‍जाजभन्न‍ुाधनों‍के‍एकीकरण, प,दल‍चलने‍की‍जस्ट्थजत‍कज‍बेूतर‍करने‍और‍ऄंजतम‍ मील‍कनेजक्टजाटी‍के‍मा्यम‍ु‍े ुाावजजनक‍परराून‍के‍पक्ष‍म‍ेंुाधन-पररातवन‍। 20.1.4.3 बूे तर‍ुााजव जनक‍क्षत्रे ः‍ुभी‍अयु‍ागों‍के‍जलए‍एक‍जीांत‍और‍ुुरजक्षत‍ुाावजजनक‍क्षेत्र‍का‍ जनमावण‍जजुमें‍बाधा‍रजूत‍ुाावभौजमक‍पुएचं ‍की‍ुुजाधा‍ूज‍जज‍ुाावजजनक‍प्लाजा‍और‍खुले‍/‍ ूरे-भरे‍स्ट्थानों, बुए-ईपयजजगता‍क्षेत्रों, ुाावजजनक‍कला‍के‍जलए‍स्ट्थान‍अदद‍बनान‍े के‍जलए‍जगू‍ बनाने‍की‍कायवनीजतयों‍ुे‍ूाजुल‍की‍गइ‍ूज। 20.1.4.4 बुए-ुाधन‍एकीकरण:‍रेल‍और‍ुड़क-अधाररत‍प्रणाजलयों‍का‍एकीकरण‍जजुम‍ें मेरज, रेल/र,जपड‍ रेल, बु/बीअरटीएु‍और‍म्याती‍ुाावजजनक‍परराून‍(अइपीटी) िाजमल‍ूज‍ुकत‍े ू‍ैं तथा‍ जजुमें‍फीडर‍ुेााओं, ट,जक्ुयों, ऑटज-ररक्िा‍और‍जनजी‍मजड‍तथा‍ग,र‍मजटरीकृत‍परराून‍ िाजमल‍ू‍ैंज,ु‍े ुाआदकल-ररक्िा, ुाआदकल, प,दल‍यात्री, अदद। 20.2 नीजत‍की‍ऄनप्रु यजज्यता 20.2.1 ‍‍दद.जा.प्रा.,‍टीओडी‍नजड‍की‍पूचान‍करेगा‍और‍प्रत्येक‍टीओडी‍नजड‍के‍जलए‍पररुीजमत‍टीओडी‍यजजना‍क्षत्रे ‍कज‍ ददखाने‍ााल‍े मानजचत्र‍जारी‍करेगा।‍टीओडी‍नीजत‍केाल‍ऐु‍े टीओडी‍नजड‍के‍प्रभाा‍क्षेत्रों‍म‍ें ूी‍लाग‍ू ूजगी।‍ यू‍नीजत‍जनम्नजलजखत‍क्षेत्रों‍म‍ें लागू‍नूीं‍ूजगी‍ऄथाा‍ज,ुा‍भी‍दद.जा.प्रा.‍द्वारा‍ुमय-ुमय‍पर‍ऄजधुूजचत‍ दकया‍जाए: i) नाजलयों, प्राकृजतक‍जलाियों, ऄजधुूजचत‍ान, दकुी‍भी‍ऄन्य‍ पयावारणीय‍ुंरजक्षत‍क्षेत्रों‍की‍भूजम‍। ii) ज़जन‍‘ओ’ और‍बफर।142 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] iii) ूररत‍जाकाु‍क्षेत्र। iv) लैंड‍पूललग‍नीजत‍के‍ऄंतगवत‍ऄजधुूजचत‍गांा। v) स्ट्मारक‍जनजीद्ध‍क्षत्रे ‍। vi) जुजाल‍लाआंु‍बंगला‍क्षत्रे ‍(ईिरी‍ददल्ली‍नगर‍जनगम‍और‍दद.जा.प्रा.‍के‍ल-े अईट‍प्लान‍के‍ऄनुु ार)‍। vii) लुरटयन्ु‍बंगला‍जजन, चाणक्यपुरी‍(जजन-डी‍के‍ईप-जजन‍डी-13‍के‍ ऄनुुार)‍। viii) चारदीाारी‍िूर‍। ix) दतू ाााु‍/‍जडप्लजम,रटक‍एन्क्लाे ‍/‍जादेिी‍जमिनों‍के‍ऄंतगवत‍भूजम‍। x) ऄनजधकृत‍कॉलजजनयां । 20.3 मागदव िकव ‍जुद्धातं 20.3.1 ‍‍यू‍फ्रेमाकव‍एफएअर‍ूते ‍ु ईच्चतर‍मानदंड‍और‍जमजश्रत‍ईपयजग‍प्रदान‍करेंगे।‍आु‍तरू‍के‍जाकाु-कायों‍के‍ प्रभााों‍का‍प्रबंधन‍करन‍े और‍ऄाुर‍बढ़ाने‍के‍जलए, आु‍नीजत‍कज‍ऄजधक‍जाकाु‍क्षमता‍ााले‍चुलनदा‍टीओडी‍‍ नजड‍म‍ें युजि पूावक‍लागू‍दकया‍जाएगा।‍आुके‍पररणामस्ट्ारूप‍ुंपजीणीयता‍के‍जुद्धांतों‍के‍ऄनुुार‍जाकजुत‍ दकए‍गए‍ुुजनयजजजत‍जाकाु‍केंद्र‍िूर‍के‍जलए‍भााी‍अर्नथक‍ुंचालकों‍और‍ुांस्ट्कृजतक‍केंद्रों‍के‍रूप‍म‍ें जाकजुत‍ूजने‍म‍ें ुक्षम‍ूज‍पाएंगे। 20.3.2 ‍‍दद.जा.प्रा.‍ आु‍िूर‍ म‍ें जाजभन्न‍ रांजजट‍ नजड‍ की‍ जाकाु‍ क्षमता‍ का‍ तेजी‍ ुे‍अकलन‍ करेगा‍और‍ ईनके‍ कायवनीजतक‍मूत्ा‍एा‍ं कायावन्ायन‍म‍ें अुानी‍के‍अधार‍पर‍ुीजमत‍ुंख्या‍म‍ें टीओडी‍नजड‍की‍पूचान‍ करेगा। 20.3.2.1 आु‍तरू‍के‍रांजजट‍नजड‍मेरज‍रेल, रेला,े अरअरटीएु‍या‍दकुी‍भी‍ऐुी‍ुाावजजनक‍परराून‍ प्रणाली‍के‍अु-पाु‍ूोंगे, जज‍एक‍ुमर्नपत‍क,ररजाे‍के‍ुाथ‍5,000‍या‍ऄजधक‍का‍्स्ट्ततम‍ घंटा‍प्रजत‍ददिा‍यातायात‍(पीएचपीडीटी) ले‍जान‍े की‍क्षमता‍रखती‍ू।ैं 20.3.2.2 आन‍मूत्ापूण‍व नजड‍की‍पूचान‍जनम्नजलजखत‍्ापक‍जाचारों‍के‍अधार‍पर‍की‍जाएगी: i) नजड‍में‍ाे‍स्ट्थल‍ूोंगे‍जजन्ू‍ें अुानी‍ुे‍टीओडी‍स्ट्कीम‍(न्यूनतम‍8 ूक्े टेयर‍जमलाकर)‍के‍ रूप‍म‍ें तत्काल‍िरूु ‍दकया‍जा‍ुकता‍ू,, ज,ुे‍दक‍खाली‍या कम‍प्रयजग‍म‍ें लाइ‍जा‍रूी‍ ुरकारी‍जमीन, ुरकारी‍अााु, ााजणजज्यक केंद्र, औद्यजजगक‍एस्ट्टेट‍अदद।‍ऐुे‍स्ट्थलों‍की‍ ईपलब्धता‍ु े ‍ुुजनजित‍ूजगा‍दक‍प्रेरक‍पररयजजनाओं‍(ररगर‍प्रजजेक्ट)‍कज‍प्राथजमकता पर िुरू‍दकया‍जा ुकता‍ू‍, तादक‍ऄन्य‍पररयजजनाओं‍कज‍नजड‍में‍अने‍के‍जलए अाश्यक‍ प्रेरणा‍दी‍जा‍ुके। ii) ईनके‍पाु‍ग्रीन‍फील्ड‍और/ऄथाा‍कम‍घनत्ा‍ााल‍े ब्राईन‍फील्ड‍का‍ऄच्छा‍खाुा‍जमला- जुला‍रूप‍ूजगा; iii) ईनकी‍ऄाजस्ट्थजत‍ुामररक‍ूजगी‍-‍या‍तज‍िूर‍के‍जलए‍अर्नथक‍/‍ुांस्ट्कृजतक‍ केंद्र‍के‍रूप‍ म‍ें या‍िूर‍म‍ें ऄल्प-जाकजुत‍क्षेत्रों‍के‍जाकाु‍/‍पुनःुुधार‍के‍जलए‍ुंभाजात‍प्रेरणा‍के‍रूप‍ में। iv) ाे‍जलापूर्नत, ुीारेज‍अदद‍ज,ु‍े बुजनयादी‍ढांच‍े के‍ईन्नयन‍के‍जलए‍ईिरदायी‍ूोंगे। 20.3.3 ‍‍आुके‍ऄजतररि , और‍ऄजधक‍टीओडी‍नजड‍पर‍केाल‍तभी‍जाचार‍दकया‍जा‍ुकता‍ू‍, जब‍घटक‍भूजम/ुंपजि‍के‍ माजलकों‍द्वारा‍पयावप्त‍रुजच‍्ि ‍की‍गइ‍ूज, ऄथावत, एकल‍या‍एकाजधक‍टीओडी‍यजजनाओं‍के‍रूप‍में‍कम‍ु‍े कम‍8‍ूक्े टेयर‍भूजम‍कज‍जाकजुत‍करन‍े का‍प्रस्ट्ताा‍ूज।‍दद.जा.प्रा.‍के‍ुमक्ष‍एक‍ुंयुि ‍अाेदन‍दकया‍जाएगा‍ जजुमें‍जनम्नजलजखत‍िाजमल‍ू:ैं[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 143 i) टीओडी‍यजजना/ओं‍के‍रूप‍म‍ेंजाकजुत‍करने‍के‍जलए‍प्रस्ट्ताजात‍स्ट्थल‍ददखाने‍ााला‍मानजचत्र, ii) टीओडी यजजनाओं‍के‍ऄंतगवत‍प्रस्ट्ताजात‍भूजम‍के‍स्ट्थान‍और‍क्षत्रे फल‍के‍जाारण‍के‍ुाथ‍भू-स्ट्ााजमयों‍की‍ ुूची, iii)ुभी‍ुंबजन्धत‍भूजम‍और‍ुंपजि‍स्ट्ााजमयों‍ुे‍ुूमजत-पत्र। दद.जा.प्रा.‍ऐु‍ेप्रस्ट्तााों‍की‍जांच‍करेगा‍और‍आन्ू‍ेंनीजत‍के‍ऄंतगवत‍िाजमल‍करन‍े के‍जलए‍ऐुे‍नजड‍पर‍जाचार‍ कर‍ुकता‍ू।, 20.3.4 ‍‍दद.जा.प्रा.‍/‍डीइ‍ुंबंजधत‍टीओडी‍‍नजड‍‍के‍पररुीजमत‍टीओडी‍जनयजजजत‍क्षेत्र‍के‍जलए‍एक‍अइजडे पी‍(IZP) त,यार‍करेगा।‍डीइ‍द्वारा‍त,यार‍अइज़ेडपी‍ऄनुमजदन‍के‍जलए‍दद.जा.प्रा.‍कज‍प्रस्ट्ततु ‍दकया‍जाएगा।‍‍दद.जा.प्रा.‍ अइज़ेडपी‍की‍त,यारी‍की‍प्रदक्रया‍में‍तेज़ी‍लान‍े के‍जलए‍जािेीज्ञ‍परामिवदाता‍फमव/ुंस्ट्थान‍जनयुि ‍कर‍ुकता‍ ू।, 20.3.4.1 यदद‍दज‍या‍दज‍ु‍े ऄजधक‍टीओडी‍नजड, ऄजत्ाजप्त‍(ओारल,प)‍करन‍े ााल‍े टीओडी‍यजजना‍क्षेत्रों‍ के‍जनकट‍ू,ैं तज‍ऐु‍े क्षेत्रों‍के‍जलए‍एकीकृत‍अइजेडपी‍के‍रूप‍म‍ेंयजजना‍बनाइ‍जाएगी। 20.3.4.2 अइजडे पी‍ईु क्षेत्र‍के‍जलए‍प्रस्ट्ताजात‍दकुी‍भी‍ऄन्य‍यजजनाओं‍या‍स्ट्कीमों‍कज‍एकीकृत‍करेगा, ज,ुे‍दक‍चलने‍की‍क्षमता‍बढ़ाने‍की‍यजजनाएं, ुड़क‍ुुधार, पार्ककग‍प्रबंधन,‍क्षेत्र‍यजजनाए‍ाँ अदद।‍ुंबजन्धत‍परराून‍एजेंजुयों‍द्वारा‍अइजडे पी‍ त,यार‍करते‍ुमय‍परराून‍स्ट्टेिनों‍के‍ अुपाु‍ प्रस्ट्ताजात‍ मल्टी-मजडल‍ एकीकरण‍ (एमएमअइ)‍ और‍ स्ट्टेिन‍ क्षेत्र‍ जाकाु‍ पररयजजनाओं‍पर‍भी‍जाचार‍दकया‍जाएगा। 20.3.4.3 क्षत्रे ‍ की‍ अाश्यकताओं‍ कज‍ पूरा‍ करने‍ के‍ जलए‍ अइजेडपी‍ कज‍ ुमय‍ के‍ ुाथ-ुाथ‍ ऄद्यतन/ुंिजजधत‍(यथा‍ऄपेजक्षत)‍दकया‍जा‍ुकता‍ू‍, तादक‍जाकाु‍गजतजाजध‍के‍कारण‍ुएए‍ पररातवन‍पररलजक्षत‍ूज‍ुकें। 20.3.5 ‍‍ुंबंजधत‍प्रभाा‍क्षेत्र‍के‍भीतर‍ुमस्ट्त‍भूजम‍और‍ुंपजियां‍आु‍नीजत‍के‍मानदंडों‍के‍ऄनुुार‍जाकाु‍करने‍के‍जलए‍ पात्र‍ूोंगी, बिते‍ाे‍प्रयजज्यता‍के‍ऄनुुार‍टीओडी यजजनाएं‍िुरू‍करन‍े की‍ऄपक्षे ाओं‍कज‍परू ा‍करें।‍आच्छुक‍भू- स्ट्ाामी‍जाजनयमों‍में‍जनधावररत‍प्रदक्रयाओं‍के‍ऄनुुार‍टीओडी‍यजजना‍त,यार‍करके‍जाकाुकताव‍ुंस्ट्था‍(डीइ)‍के‍ रूप‍म‍ेंअाेदन‍कर‍ुकते‍ू।ैं 20.3.6 ‍‍ूालांदक‍टीओडी नीजत‍के‍ऄंतगवत‍भागीदारी‍स्ट्ा,जच्छक‍ू,, आु‍नीजत‍के‍जाकाु‍जनयंत्रण‍मानदंड‍का‍लाभ‍केाल‍ ऄनुमजददत‍टीओडी यजजनाओं‍के‍मा्यम‍ुे‍भाग‍लेकर‍ईठाया‍जा‍ुकता‍ू।, ‍टीओडी नजड‍के‍भीतर,‍घटक‍ भूजम‍/‍ुंपजि‍स्ट्ाामी‍जज‍टीओडी‍पॉजलुी‍म‍ें भाग‍नूीं‍लते े‍ूैं, ईन्ू‍ें टीओडी‍लाभों‍कज‍्यान‍में‍रखे‍जबना‍ ऄनुमेय‍एफएअर‍के‍ऄनुुार‍ऄपने‍मौजूदा‍भानों‍के‍पुनर्ननमावण‍/‍परराधवन‍/‍पररातवन‍करने‍की‍ऄनुमजत‍ ूजगी।‍ाे‍दद.जा.प्रा.‍की‍दकन्ूीं‍ऄन्य‍नीजतयों‍के‍मानदंडों‍का‍लाभ‍ईठाने‍के‍जलए‍भी‍पात्र‍नूीं‍ूोंगे, जब‍तक‍ दक‍जािेी‍रूप‍ुे‍ऄन्यथा‍न‍कूा‍जाए। 20.4 टीओडी‍यजजनाए ाँ 20.4.1 ‍‍टीओडी‍यजजनाओं‍कज‍पात्र‍ूजने‍के‍जलए‍जनम्नजलजखत‍मानदंडों‍कज‍पूरा‍करना‍ूजगा: 20.4.1.1 टीओडी‍यजजना‍म‍ें न्यूनतम‍1‍ूक्े टेयर‍क्षत्रे ‍िाजमल‍ूजना‍चाजूए।‍टीओडी‍यजजनाए‍ाँ टीओडी‍ नजड‍के‍गून‍जाकाु‍क्षत्रे ‍म‍ें पूरी‍तरू‍या‍अंजिक‍रूप‍ु‍े िाजमल‍ूज‍ुकती‍ू।ैं ‍दकुी‍भी‍ जस्ट्थजत‍म‍ें- i) यजजना‍क्षत्रे ‍का‍कम‍ु‍ेकम‍25% जूस्ट्ुा‍गून‍जाकाु‍क्षत्रे ‍म‍ेंअएगा। ii) ुंपूणव‍यजजना‍क्षेत्र‍टीओडी‍यजजना‍क्षेत्र‍के‍ऄंतगवत‍अएगा।144 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 20.4.1.2 टीओडी‍यजजना‍18‍मीटर‍के‍न्यूनतम‍मागावजधकार‍मौजूदा‍ुड़क‍ुे‍पुएचाँ ‍यजग्य‍ूजनी‍चाजूए‍ जज यजजना‍की‍पररजध‍के‍कम‍ु‍ेकम‍15%‍के‍ुमतल्ु य‍ऄबाध‍लंबाइ‍की‍ूज। 20.4.2 ‍‍अााुीय‍क्षेत्र‍और‍आलाके‍के‍स्ट्तर‍के‍पीएुपी‍(ुीजनयर‍ुेकेंडरी‍स्ट्कूलों‍और‍पाकों‍कज‍छजड़कर)‍के‍जलए‍ जनधावररत‍प्लॉट‍कज‍टीओडी‍स्ट्कीमों‍में‍िाजमल‍दकया‍जा‍ुकता‍ू,, बिते‍दक‍ऄंतर्ननजूत‍जमीन‍डीइ/‍डीइ‍के‍ घटक‍भ-ू स्ट्ााजमयों‍की‍ूज।‍ऐु‍े मामलों‍म,ें यजजना‍म‍ें ईुी‍प्रकार‍की‍और‍ईुी‍क्षेत्र‍की‍ुमतुल्य‍ुुजाधाए‍ं प्रदान‍की‍जाएंगी।‍य‍ेुुजाधाएं‍आु‍नीजत‍के‍ऄंतगवत‍जनधावररत‍ऄजनाायव‍पीएुपी‍ऄपक्षे ाओं‍के‍ऄजतररि ‍ूोंगी। 20.4.3 ‍‍ुाावजजनक‍क्षेत्र‍ज,ु‍े ुड़क, खुली‍जगू, नाजलयों‍अदद‍कज‍एकीकृत‍यजजना‍के‍प्रयजजनाथव‍टीओडी‍यजजना‍म‍ें िाजमल‍दकया‍जा‍ुकता‍ू,,‍बिते‍जनम्नजलजखत‍ित‍ें परू ी‍की‍जाएं: 20.4.3.1 ुाावजजनक‍ुड़कें‍(18‍मीटर‍ुे‍कम‍मागावजधकार) 20.4.3.2 ुाावजजनक‍नाजलयां‍(5‍मीटर‍की‍चौड़ाइ‍ुे‍ऄजधक‍नूीं) 20.4.3.3 ुाावजजनक‍पाकव‍(यजजना‍के‍ऄनुुार‍छजटे‍बच्चों‍के‍खले ‍के‍म,दान‍की‍खुली‍जगू‍के‍क्रम‍ुे‍ ऄजधक‍नूीं) ूालांदक, ऐुी‍ुाावजजनक‍ुुजाधाओं‍के‍ऄतं गतव ‍क्षेत्र‍पर‍ऄनुमये ‍एफएअर‍/‍ग्राईंड‍कारेज‍की‍गणना‍के‍जलए‍ न्यूनतम‍यजजना‍क्षेत्र‍की‍ऄपेक्षा‍कज‍पूरा‍करन‍े के‍जलए‍जाचार‍नूीं‍दकया‍जाएगा। 20.4.4 ‍‍ुभी‍टीओडी यजजनाओं‍के‍जलए‍प्लॉटों‍का‍ुमामेलन‍और‍पुनगवठन‍(अााुीय‍क्षेत्र‍और‍आलाके‍के‍पीएुपी ुजूत)‍की‍ऄनुमजत‍दी‍जाएगी।‍टीओडी यजजना‍क्षेत्र‍के‍भीतर‍मौजूदा‍ुड़कों‍और‍खुली‍जगूों‍के‍पनु र्नान्याु‍ की‍ऄनुमजत‍ूजगी, बिते‍दक: 20.4.4.1 पुनः‍जान्याु‍दकए‍गए‍ल-े अईट‍में‍ुड़कों‍और‍खलु े‍स्ट्थानों‍में‍बराबर‍ऄथाा‍ऄजधक‍क्षेत्र‍प्रदान‍ दकया‍जाए।‍जजन‍क्षेत्रों‍में‍प,दल‍चलन‍े ाालों‍की‍अााजाूी‍के‍जलए‍ुड़कों‍का‍ठीक-ठाक‍ नेटाकव‍पूल‍े ुे‍मौजूद‍ू,, ाूााँ‍तक‍आुे‍यथाुंभा‍ुंरजक्षत‍दकया‍जाएगा। 20.4.4.2 ुाावजजनक‍पाकों‍और‍ुड़कों‍के‍मामल‍े म‍ें ुंबंजधत‍ुाावजजनक‍एजेंजुयों‍ु‍े जाजधात‍ऄनुमजदन‍ प्राप्त‍दकया‍गया‍ूज।‍ऐु‍े ुाावजजनक‍क्षेत्रों‍कज‍ुंबंजधत‍ुाावजजनक‍एजेंुी‍कज‍ुौंप‍ददया‍ जाएगा‍और‍ूर‍ुमय‍जनता‍के‍जलए‍खलु ा‍रखा‍जाएगा। 20.4.4.3 मौजूदा‍पेड़ों‍कज‍कम‍ुे‍कम‍नुकुान‍ूज। 20.4.4.4 खंड‍20.4.3.3 के‍ऄनुुार‍मौजूदा‍ुाावजजनक‍पाकों‍के‍ऄंतगतव ‍अने‍ााल‍े क्षेत्रों‍(यदद‍कजइ‍ूज)‍ कज‍ुंरजक्षत‍दकया‍जाएगा‍और‍ईनकी‍गणना‍यजजना‍की‍न्यूनतम‍ूररत‍ुाावजजनक‍स्ट्थान‍ ुंबंधी‍ऄपेक्षा‍के‍प्रजत‍नूीं‍की‍जाएगी। 20.4.5 ब्राईन‍फील्ड‍स्ट्थलों‍के‍मामल‍े म,ें आु‍नीजत‍के‍ऄंतगवत‍अााुीय‍आकाआयों‍की‍ुंख्या‍में‍ाृजद्ध‍की‍ऄनुमजत‍दी‍ जाएगी‍(ुूकारी‍ुमूू‍अााु‍ुजमजतयों‍के‍मामल‍े म‍ें भी,‍जजुके‍जलए‍रजजस्ट्रार‍ऑफ‍ुजुाआटीज‍द्वारा‍ ुंगत‍जाजनयमों/ऄजधजनयमों‍म‍ें ुंिजधन‍दकया‍जा‍ुकता‍ू), ।‍ूालांदक‍टीओडी‍स्ट्कीम‍में‍मौजूदा‍अााुीय‍ आकाआयों‍की‍ुंख्या‍कज‍कम‍करने‍की‍ऄनुमजत‍नूीं‍ूजगी। 20.4.6 ‍‍टीओडी‍यजजनाओं‍के‍ऄंतगवत‍जाकाु-कायव‍म‍ें नए‍जाकाु-काय,व अंजिक/पूण‍व पनु र्ननमावण‍और‍मौजूदा‍ुरं चनाओं‍ के‍अंजिक/पूण‍व रेरजदफरटग‍का‍जमला-जुला‍रूप‍ूज‍ुकता‍ू।, 20.4.7 ‍‍टीओडी यजजनाओं‍में‍जाजभन्न‍भूजम‍ईपयजगों/ईपयजग‍पररुरों‍के‍ऄंतगवत‍प्लॉट‍िाजमल‍ूज‍ुकते‍ू।ैं ‍टीओडी‍ यजजना‍में‍प्रत्येक‍प्लॉट‍के‍जलए‍ऄनुमेय‍जमजश्रत‍ईपयजग‍जनधावररत‍भूजम-ईपयजग/ईपयजग‍पररुर‍पर‍जनभवर‍ करते‍ुएए‍नीचे‍दी‍गइ‍ताजलका‍के‍ऄनुुार‍ूजगा:[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 145 ताजलका‍20.1:‍टीओडी‍म‍ेंजमजश्रत‍ईपयजग/एफएअर‍का‍जातरण जडे डीपी/ल-े अईट‍ ऄनमु ये ‍जमजश्रत‍ईपयजग‍(टीओडी‍यजजना‍म‍ेंएफएअर‍का‍जातरण) प्लान‍ के‍ऄनुु ार‍भजू म‍ अााुीय‍ईपयजग‍ ्ााुाजयक‍‍ पीएुपी‍ ऄन्य‍ईपयजग ईपयजग/प्लॉट‍का‍ के‍जलए‍एफएअर‍ ईपयजग‍के‍जलए‍ और/ऄथाा‍ऄन्य‍ ईपयजग‍पररुर का‍न्यनू तम‍% एफएअर‍का‍ ईपयजगी‍ुाे ाओं‍ न्यनू तम‍% के‍जलए‍एफएअर‍ का‍न्यनू तम‍%‍ अााुीय 50% 10% 20% ऄन्य‍ईपयजग*‍20%‍ तक‍की‍ऄनुमजत‍ू।, ‍ ्ााुाजयक 30% 50% 10% ऄन्य‍ईपयजग*‍10%‍ तक‍की‍ऄनुमजत‍ू।, औद्यजजगक 30% 10% 10% िेी‍50%‍एफएअर‍ औद्यजजगक‍ईपयजग‍के‍ जलए‍ू।, ुरकारी 30% 10% 10% िेी‍50% एफएअर‍ दकुी‍भी‍ुरकारी‍ ईपयजग‍के‍जलए‍ूज‍ ुकता‍ू।, ‍ परराून 30% 10% 10% िेी‍50% एफएअर‍का‍ ईपयजग‍परराून‍ ुुजाधाओं‍के‍जलए‍ुभी‍ पररचालन‍‍ अाश्यकताओं‍कज‍परू ा‍ करने‍के‍बाद‍दकुी‍भी*‍ प्रयजजन‍के‍जलए‍ूज‍ ुकता‍ू , पीएुपी‍(खंड‍ ऐुे‍प्लॉटों‍के‍जलए‍एफएअर‍का‍ईपयजग‍टीओडी‍यजजना‍म‍ें परू ी‍तरू‍पीएुपी‍ 20.4.2‍के‍ऄनुुार‍ और/ऄथाा‍जन-ईपयजजगताओं‍के‍जलए‍दकया‍जाएगा। केाल‍अााुीय‍और‍ अु-पड़जु‍के‍‍स्ट्तर‍ पर‍पीएुपी‍प्लॉटों‍ की‍ऄनुमजत‍ू), * आु‍िेी‍एफएअर‍का‍ईपयजग‍पररयजजना‍की‍अाश्यकता‍के‍ऄनुुार‍अााुीय, ्ााुाजयक‍और‍पीएुपी‍के‍ जमजश्रत‍रूप‍में‍दकुी‍भी‍ऄनुपात‍में‍दकया‍जा‍ुकता‍ू।, 20.4.8 ‍‍ऄजधुूजचत‍जमजश्रत‍ईपयजग/्ााुाजयक‍ुड़कों‍के‍ऄंतगवत‍अन‍े ााल‍े दकुी‍भी‍प्लॉट,‍जज‍टीओडी‍यजजना‍का‍ जूस्ट्ुा‍ू,ैं कज‍ताजलका‍20.1‍म‍ें'अााुीय' के‍जलए‍जनर्ददष्ट‍मानदंडों‍के‍ऄनुुार‍जाकजुत‍दकया‍जाएगा। 20.4.9 ‍‍टीओडी‍यजजना‍म‍ें प्रत्येक‍घटक‍के‍जलए‍एफएअर‍और‍जमजश्रत‍ईपयजग‍की‍ऄलग-ऄलग‍गणना‍की‍जाएगी।‍ टीओडी‍यजजना‍के‍जलए‍ुमग्र‍जमजश्रत‍ईपयजग‍प्रत्येक‍घटक‍प्लॉट‍के‍जलए‍पररकजलत‍जमजश्रत‍ईपयजग‍का‍कुल‍ यजग‍ूजगा।‍डीइ‍के‍पाु‍जडजाआन‍कज‍्यान‍म‍ें रखत‍े ुएए‍पूरे‍पुनगवरठत‍यजजना‍क्षत्रे ‍पर‍ऐुे‍ुमग्र‍जमजश्रत‍146 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ईपयजग‍का‍प्रयजग‍करन‍े की‍स्ट्ातन्त्रता‍ूजगी।‍जनधावररत‍जमजश्रत‍ईपयजग‍कज‍भानों‍के‍भीतर‍ईपयजग‍के‍ उ्ाावधर‍जमजश्रत‍ईपयजग‍करके‍भी‍प्राप्त‍दकया‍जा‍ुकता‍ू,, बिते‍दक: 20.4.9.1 केाल‍ग,र-जाजनमावण‍ईद्यजग‍(ुेाा‍ईद्यजग‍ज,ुे‍अइटी / अइटीइएु, बीपीओ/केपीओ‍अदद)‍ और‍ग,र-प्रदीू णकारी‍एमएुएमइ‍आकाआयां‍ूी‍अााुीय, ्ााुाजयक‍और‍ुंस्ट्थागत‍ईपयजग‍ ज,ुे‍ऄन्य‍ईपयजगों‍के‍ुाथ‍जजड़ी‍जाएाँ। 20.4.9.2 ि,क्षजणक‍ुंस्ट्थानों, अंगनााजड़यों, जििुगृू, ाृद्धाश्रम‍अदद‍कज‍ऄस्ट्पतालों, दंड‍ुंस्ट्थानों‍जु, े‍ दक‍ुुधार‍गृू, जेल, या‍जाजनमावण‍और/या‍भण्डारण‍केन्द्रों‍के‍ुाथ‍न‍जजड़ा‍जाए। 20.4.9.3 ईपयुवि ‍ ुुजाधाओं‍ कज‍ ऄजनाायवत:‍ जनचली‍ मंजज़लों‍ पर‍ जनर्नमत‍ दकया‍ जाना‍ चाजूए, ऄजधमानतः‍टीओडी‍यजजना‍के‍खुले‍स्ट्थानों‍तक‍पुएचं ‍की‍ुुजाधा‍के‍ुाथ‍। 20.4.9.4 प्रचजलत‍यूबीबीएल‍की‍ा,धाजनक‍ऄपेक्षा‍का‍ऄनपु ालन‍करत‍े ुएए‍ईपयजगों‍के‍उ्ाावधर‍जमश्रण‍ ााले‍भानों‍में‍अाश्यक‍ऄलग‍प्राेि-स्ट्थल/जनकाु‍और‍ुर्नाु‍कजर‍प्रदान‍करना‍ूजगा। 20.4.10 टीओडी‍यजजना‍के‍ऄंतगवत‍परराून‍भूजम‍के‍ईपयजग‍के‍ऄंतगतव ‍अने‍ााले‍प्लॉटों‍के‍जलए, एफएअर, भूजम‍ कारेज, न्यूनतम‍यजजना‍क्षेत्र‍और‍जमजश्रत‍ईपयजग‍की‍गणना‍के‍जलए‍जनम्नजलजखत‍क्षेत्रों‍कज‍िाजमल‍दकया‍ जाएगा: 20.4.10.1 रांजज़ट‍स्ट्टेिनों‍के‍प्लेटफामों‍का‍क्षेत्र‍जजुमें‍केाल‍प्लेटफॉमव‍की‍लंबाइ‍तक‍पटररयों‍के‍नीचे‍की‍ भूजम‍ूजगी।‍ 20.4.10.2 जडपज‍के‍मामले‍म,ें पररचालन‍क्षेत्र‍जजुमें‍ऐुे‍प्लॉटों‍के‍भीतर‍पटररयों‍के‍नीच‍ेकी‍भूजम‍ूजगी। आन‍क्षेत्रों‍म‍ें ओार‍स्ट्टेिन‍और‍ओार‍र,क‍जाकाु‍कायव‍की‍ऄनुमजत‍ूजगी।‍ओार‍स्ट्टेिन‍का‍जाकाु‍काय‍व प्लेटफॉमव‍की‍लंबाइ‍तक‍ुीजमत‍ूजगा। 20.4.11 ्ााुाजयक‍एफएअर‍का‍ईपयजग‍ुामुदाजयक‍केंद्र‍(टीओडी‍यजजनाओं‍म‍ें18‍ु‍े 30‍मीटर‍के‍मागावजधकार के‍ ुाथ)‍और‍जजला‍केंद्रों‍(टीओडी‍यजजनाओं‍म‍ें 30‍मीटर‍या‍ईुुे‍ऄजधक‍के‍मागावजधकार‍के‍ुाथ)‍म‍ें ऄनुमेय‍ कायवकलाप‍करन‍े के‍जलए‍दकया‍जा‍ुकता‍ू।, 20.4.12 डीइ‍टीओडी‍यजजना‍ल-े अईट‍के‍भाग‍के‍रूप‍में‍जनम्नजलजखत‍ऄजनााय‍व ुाावजजनक‍क्षत्रे ‍की‍्ास्ट्था‍करेगा: 20.4.12.1 ूररत‍ुाावजजनक‍स्ट्थल: i) ुमामेजलत‍प्लॉट‍का‍20%‍क्षत्रे ‍ुाावजजनक‍ईपयजग‍के‍जलए‍ूररत‍ुाावजजनक‍स्ट्थल‍के‍ रूप‍म‍ें जाकजुत‍दकया‍जाएगा।‍डीइ‍आु‍े छजटे‍टुकड़ों‍(पाुवल)‍के‍रूप‍म‍ें जडजाआन‍और‍ जाकजुत‍करेगा‍जज‍ुाावजजनक‍स्ट्थल‍के‍रूप‍म‍ें ुमुदाय‍के‍जलए‍ईपयजगी‍ूज‍तथा‍कम‍ु‍े कम‍एक‍टुकड़ा‍2000‍ाग‍व मीटर‍का‍ूजना‍चाजूए।‍आु‍तरू‍के‍ूररत‍स्ट्थान‍कज‍गेट-मुि ‍ रखा‍जाएगा, कम‍ु‍े कम‍एक‍तरफ‍ु‍े एक‍मागावजधकार‍(18‍मीटर‍या‍ईुुे‍ऄजधक)‍ु‍े ुीधे‍पुएचं -ुुजाधा‍ूज‍और‍रखरखाा‍के‍जलए‍ुंबंजधत‍स्ट्थानीय‍जनकाय‍कज‍ुौंपा‍जाएगा।‍ ऐु‍े ूररत‍स्ट्थल‍पर‍दकुी‍पार्ककग‍या‍बेुमेंट‍की‍ऄनुमजत‍नूीं‍ूजगी। ii) डीइ‍द्वारा‍ऄजधभजजगयों‍के‍ऄनन्य‍ईपयजग‍के‍जलए‍ऄजतररि ‍10%‍ूररत‍स्ट्थल/मनजरंजक‍ क्षत्रे ‍जाकजुत‍दकया‍जाएगा।‍आुम‍ें प्लाज़ा, बच्चों‍के‍खले ‍के‍स्ट्थान, ूररत‍स्ट्थल, बगीचा, ुाझे‍क्षत्रे ‍अदद‍िाजमल‍ूज‍ुकते‍ू,ैं जज‍बेुमेंट, पजजडयम, ट,रेु‍अदद‍पर‍भी‍ददए‍जा‍ ुकते‍ू।ैं ‍आु‍प्रयजजनाथव‍प्रयजग‍म‍ें लाए‍गए‍पजजडयम‍क्षत्रे ‍कज‍ग्राईंड‍कारेज‍की‍गणना‍के‍ जलए‍िाजमल‍नूीं‍दकया‍जाएगा।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 147 iii) परराून‍भूजम‍ईपयजग‍के‍मामले‍म,ें जूां‍पटररयों‍के‍नीचे‍बड़े‍क्षेत्र‍ााली‍टीओडी यजजनाओं‍में‍जमीनी‍स्ट्तर‍पर‍ूररत‍ुाावजजनक‍स्ट्थल‍बनाना‍ुभं ा‍नूीं‍ू,, आु‍ऄपेक्षा‍कज‍ पजजडयम‍स्ट्तर‍के‍ुाावजजनक‍ूररत‍स्ट्थल‍बनाकर‍पूरा‍दकया‍जा‍ुकता‍ू।, ‍आु‍तरू‍के‍ ूररत‍स्ट्थल‍का‍रखरखाा‍ुंबंजधत‍परराून‍एजेंुी‍द्वारा‍दकया‍‍जाएगा। 20.4.12.2 ुाावजजनक‍ुड़क‍नेटाकवः‍डीइ‍टीओडी‍यजजना‍के‍भीतर‍जनम्नजलजखत‍मानदडं ों‍के‍ऄनुुार‍ ुाावजजनक‍ईपयजग‍के‍जलए‍ऄजतररि ‍ुड़कों‍/‍गजलयों‍का‍जनमावण‍करेगा। i) ुड़क‍नेटाकव‍की‍यजजना‍लगभग‍250‍मीटर‍ुी/ुी‍के‍ााून‍माग‍व नेटाकव‍के‍ुाथ‍और‍ लगभग‍100‍मीटर‍ुी/ुी‍के‍पद, ल‍यात्री‍नेटाकव‍के‍ुाथ‍बनाइ‍जाएगी। ii) जमीनी‍पररजस्ट्थजतयों‍के‍अधार‍पर, आुमें‍ऄजधकतम‍10%‍तक‍की‍छूट‍दी‍जा‍ुकती‍ू।, 20.4.13 िूर‍स्ट्तर‍के‍पीएुपी प्लॉट‍(ुामुदाजयक‍या‍क्षेत्रीय‍पीएुपी और‍मा्यजमक‍स्ट्कूल)‍दकुी‍भी‍टीओडी‍ यजजना‍का‍जूस्ट्ुा‍नूीं‍ूज‍ुकते।‍ूालांदक, टीओडी‍नजड‍म‍ें बढ़ी‍ुएइ‍अबादी‍कज‍ुेाा‍देन‍े के‍जलए‍स्ट्ाास्ट््य, जिक्षा‍और‍ऄन्य‍पीएुपी‍ुुजाधाओं‍ूते ु‍ऄजतररि ‍अाश्यकता‍कज‍पूरा‍करने‍के‍जलए, टीओडी‍यजजना‍क्षेत्र‍के‍ भीतर‍परू ी‍तरू‍ुे‍िाजमल‍ऐुे‍दकुी‍भी‍पीएुपी प्लॉट‍(1‍ू.े‍ुे‍ऄजधक‍या‍ुमकक्ष)‍कज‍स्ट्टैंड-ऄलजन‍ टीओडी‍यजजनाओं‍के‍रूप‍म‍ें अाेदन‍करन‍े की‍ऄनुमजत‍दी‍जा‍ुकती‍ू।, ‍आु‍तरू‍की‍यजजनाएं‍मौजूदा‍ ऄनुमेय‍एफएअर‍के‍1.5‍गनु ा‍तक‍ऄजतररि ‍एफएअर‍प्राप्त‍कर‍ुकती‍ू,ैं ‍जज‍ऄजधकतम‍500‍तक‍ूजगी।‍ जनम्नजलजखत‍ऄजतररि ‍ितें‍लागू‍ूोंगी: 20.4.13.1 जमजश्रत‍ईपयजग‍मानदडं ‍ऐुे‍स्ट्थलों‍पर‍लागू‍नूीं‍ूोंग,े और‍मौजूदा‍ईपयजग-‍अधार‍बरकरार‍ रखा‍जाएगा। 20.4.13.2 स्ट्कूल‍के‍प्लॉटों‍के‍मामल‍े म,ें खेल‍के‍म,दान‍के‍ऄंतगवत‍मौजदू ा‍क्षत्रे ‍कज‍ईुी‍प्लॉट‍के‍भीतर‍ बनाए‍रखा‍जाएगा‍या‍बढ़ाया‍जाएगा। 20.4.13.3 जनकटाती‍ुड़क‍का‍मागावजधकार‍30‍मी.‍ु‍ेकम‍नूीं‍ूजगा। 20.4.14 दज‍टीओडी‍नजड‍म‍ें अन‍े ााली‍टीओडी‍यजजनाओं‍(जूां‍ऐुे‍टीओडी‍नजड‍‍के‍प्रभाा‍क्षेत्र‍ुमीप‍और‍ जनकटाती‍ू)ैं ‍के‍ुंबंध‍म‍ें ऄनमु जदन‍के‍जलए‍जाचार‍दकया‍जा‍ुकता‍ू,, बिते‍ा‍े आु‍नीजत‍के‍ऄंतगवत‍ऄन्य‍ ुभी‍ितों‍कज‍पूरा‍करत‍े ूों। 20.4.15 स्ट्टेिन‍क्षेत्र‍जाकाु‍ऄथाा‍मल्टी-मजडल‍रांजजट‍ूब‍के‍जाकाु‍के‍जलए‍कइ‍परराून‍एजेंजुयों‍के‍बीच‍ुंयुि ‍ ईद्यम‍िरूु ‍करने‍पर‍जाचार‍दकया‍जा‍ुकता‍ू।, ‍आु‍तरू‍की‍पररयजजनाओं‍कज‍जाजभन्न‍परराून‍ुेााओं‍के‍ बीच‍एकीकरण‍ुुजनजित‍करन‍े के‍जलए‍जडज़ाआन‍दकया‍जाएगा‍और‍याजत्रयों‍की‍ुूज‍अााजाूी‍के‍जलए‍ एक‍ूी‍भान/पररुर‍के‍जूस्ट्ु‍े के‍रूप‍म‍ें जडज़ाआन‍दकया‍जा‍ुकता‍ू।, ‍जूा‍ं भी‍ुंभा‍ूज,‍टीओडी‍यजजना‍के‍ जाकाु‍और‍बड़े‍परराून‍स्ट्टेिनों‍के‍बीच, ुजम्मलन‍स्ट्तर‍का‍एकीकरण‍ुुजनजित‍दकया‍जाएगा, और‍ईुकी‍ लागत‍डीइ‍द्वारा‍ाून‍की‍जाएगी। 20.4.16 डीइ टीओडी जाजनयमों‍में‍ार्नणत‍प्रााधानों‍के‍ऄनुुार‍जाकाु-कायव‍करेगा। 20.5 टीओडी यजजनाओं‍के‍जलए‍जाकाु‍जनयत्रं ण‍मानदडं 20.5.1 ‍‍आु‍नीजत‍के‍जाकाु‍जनयंत्रण‍मानदंड‍ुभी‍टीओडी‍यजजनाओं‍पर‍लागू‍ूोंगे‍और‍प्लान‍के‍ऄंतगतव ‍दकुी‍भी‍ ऄन्य‍नीजत/प्रााधानों‍के‍ुाथ‍मतभेद‍के‍मामले‍में‍प्रभााी‍ूोंगे।‍टीओडी‍यजजनाओं‍के‍ऄंतगवत‍जाकाु-कायव‍नए‍ जाकाु, मौजूदा‍ुंरचनाओं‍के‍अंजिक/पूण‍व पनु र्ननमावण‍और‍अंजिक/पणू व‍रेरजदफरटग‍का‍जमला-जुला‍रूप‍ूज‍148 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ुकता‍ू।, ‍आु‍ुंबंध‍में‍ऄपनाइ‍जान‍े ााली‍कायवनीजत‍डीइ‍द्वारा‍टीओडी‍यजजना‍के‍भाग‍के‍रूप‍म‍ें प्रस्ट्ततु ‍की‍ जाएगी‍और‍जाजनयमों‍में‍जनधारव रत‍प्रदक्रया‍के‍ऄनुुार‍ऄनुमजददत‍की‍जाएगी। 20.5.2 एफएअर 20.5.2.1 टीओडी‍यजजना‍के‍जलए‍एफएअर‍की‍गणना‍ुभी‍घटक‍प्लॉटों‍के‍जलए‍एफएअर‍गणना‍के‍ यजग‍के‍रूप‍म‍ें की‍जाएगी।‍प्रत्येक‍घटक‍प्लॉट‍के‍जलए‍एफएअर‍पात्रता‍की‍गणना‍जनम्नानुु ार‍ की‍जाएगी: i) एफएअर‍प्लॉट‍पर‍मौजूदा‍ऄनमु ेय‍एफएअर‍का‍1.5‍गुना‍या‍300‍ूजगा, जज‍ भी‍ ऄजधक‍ूज। ii) टीओडी‍यजजनाओं‍म‍ें िाजमल‍दकुी‍भी‍प्लॉट‍के‍जलए‍ऄजधकतम‍एफएअर‍ुीमा‍500‍ ूजगी। iii) 4‍ूक्े टे.‍और‍ईुुे‍ऄजधक‍के‍क्षत्रे ‍ााली‍बड़ी‍टीओडी‍यजजनाएं, जूां‍30‍मी.‍मागावजधकार ााली‍ुड़कों‍ु‍े ुीधी‍पुएचं ‍ूज, ुभी‍घटक‍प्लॉटों‍पर‍500‍के‍एफएअर‍के‍जलए‍पात्र‍ ूोंगी,‍यदद‍्ाूायव‍ूज। 20.5.2.2 ूालांदक‍ुंपूणव‍पात्र‍एफएअर‍का‍ईपयजग‍करना‍ऄजनाायव‍नूीं‍ू,,‍ुभी‍टीओडी‍यजजनाओं‍द्वारा‍ जनम्नजलजखत‍ुुजनजित‍दकया‍जाएगा: i) न्यूनतम‍एफएअर‍का‍ईपयजग‍प्रत्येक‍प्लॉट‍के‍जलए‍मौजूदा‍ऄनुमेय‍एफएअर‍के‍ ुमतुल्य‍ूज। ii) जमजश्रत‍ईपयजग‍के‍ुमग्र‍ऄनुपात‍कज‍ूमेिा‍बनाए‍रखा‍जाए। 20.5.2.3 ऐुी‍टीओडी‍यजजनाओं‍के‍मामल‍े म,ें जजनमें‍मौजूदा‍ुर्नाु‍लेन/ुाावजजनक‍ुड़कें/ुाावजजनक‍ नाजलयां/ुाावजजनक‍पाकव‍अदद‍िाजमल‍ू,ैं ऐुे‍क्षेत्रों‍के‍ऄंतगतव ‍अन‍े ााली‍भूजम‍कज‍एफएअर‍ की‍गणना‍के‍जलए‍जूुाब‍में‍नूीं‍जलया‍जाएगा। 20.5.2.4 जाकाु-कायव‍के‍जूस्ट्ुे‍के‍रूप‍म‍ें दी‍गइ‍कजइ‍भी‍ुाावजजनक‍ुुजाधा‍ज,ुे‍दक‍ुाावजजनक‍ िौचालय, पुल‍आत्यादद‍एफएअर‍ु‍े मुि ‍ूजगी, आु‍ितव‍के‍ऄ्यधीन‍दक‍ईनका‍रखरखाा‍डीइ‍ द्वारा‍जनयजमत‍रूप‍ुे‍दकया‍जाए‍और‍ददन‍भर‍जनता‍के‍जलए‍खुली‍और‍ुुलभ‍रूें, ऐुा‍न‍ ूजने‍पर‍ुंबंजधत‍स्ट्थानीय‍जनकाय‍ईुका‍ऄजधग्रूण‍कर‍लेगा। 20.5.2.5 ऐुी‍टीओडी‍यजजनाए‍ं जज‍उंचाइ‍ुंबंधी‍प्रजतबंधों‍के‍कारण‍ऄनुमेय‍एफएअर‍का‍ईपयजग‍ करन‍े में‍ुक्षम‍नूीं‍ू,ैं ईन्ू‍ें ऄजग्न‍ुुरक्षा‍ऄपेक्षा‍के‍ऄ्यधीन‍और‍ूररत‍ुाावजजनक‍स्ट्थल‍के‍ ऄंतगतव ‍बनाए‍रखे‍जान‍े ााले‍क्षेत्र‍कज‍कम‍दकए‍जबना‍ग्राईंड‍कारेज‍और‍ुेटब,क‍में‍छूट‍दी‍जा‍ ुकती‍ू।, 20.5.2.6 30‍मीटर‍और‍ऄजधक‍के‍मागावजधकार ुे‍ुीधी‍पुएचं ‍ााली‍बड़ी‍टीओडी‍यजजनाओं‍(4‍ूक्े टेयर‍ या‍ईुुे‍ऄजधक)‍कज‍टीडीअर‍प्राप्त‍क्षेत्रों‍के‍रूप‍में‍माना‍जाएगा‍और‍डीुीएन के‍ऄनुुार‍ टीडीअर का‍ईपयजग‍दकया‍जाएगा। 20.5.3 अााुीय‍आकाआयों‍का‍अकार 20.5.3.1 टीओडी‍यजजना‍के‍भीतर‍मौजूदा‍अााुीय‍आकाआयों‍कज‍ुमायजजजत‍करने‍के‍जलए‍अााुीय‍ आकाआयों‍के‍अकार‍पर‍कजइ‍प्रजतबंध‍नूीं‍ू,। 20.5.3.2 टीओडी‍यजजनाओं‍के‍भीतर‍दकफायती‍और‍गर, -स्ट्ााजमत्ा‍ााले‍अााु‍(दकराय‍े के‍अााु, छात्रों‍ के‍जलए‍मकान‍और‍छात्राााु)‍कज‍प्रजत्ुाजूत‍करने‍के‍जलए, जनम्नजलजखत‍मानदडं ‍लाग‍ूूोंग े i) मौजूदा‍अााु‍आकाआयों‍की‍ुंख्या‍कज‍ुमायजजजत‍करने‍के‍बाद, िेी‍अााुीय‍एफएअर‍ का 60‍ाग‍व मीटर‍तक‍के‍अकार‍की‍अााुीय‍आकाआयों‍का‍जनमावण‍करने‍के‍जलए‍ईपयजग‍ दकया‍जाएगा।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 149 ii) यदद‍टीओडी‍यजजना‍में‍ऐुे‍प्लॉट‍िाजमल‍ू‍ैं जूां‍कजइ‍मौजूदा‍अााुीय‍जाकाु-कायव‍ नूीं‍ुएअ‍ू,, ाूााँ‍अााुीय‍एफएअर‍के‍कम‍ुे‍कम‍50%‍का‍ईपयजग‍80‍ागव‍मीटर‍तक‍ के‍अकार‍की‍अााुीय‍आकाआयों‍कज‍जनर्नमत‍करने‍के‍जलए‍दकया‍जाएगा। iii) यदद‍टीओडी‍यजजनाओं‍म‍ें मौजूदा‍जनर्नमत‍और‍खाली‍प्लॉटों‍का‍जमलाजुला‍रूप‍ू,, तज‍ टीओडी‍स्ट्कीम‍म‍ें अााु‍आकाआयों‍का‍ऄंजतम‍जमजश्रत‍रूप‍ईपयुवि ‍प्रााधानों‍के‍ऄनुुार‍ यथानुपात‍अधार‍पर‍तय‍दकया‍जाएगा। 20.5.4 ग्राईंड‍कारेज‍और‍ुटे बक, : ुेटब,क‍और‍ग्राईंड‍कारेज‍ुंबंधी‍मानदंड‍यजजना‍क्षेत्र‍के‍जलए‍पुनगवरठत‍प्लान‍के‍ ऄंतगतव ‍ुंपणू व‍टीओडी‍यजजना‍ुीमा‍पर‍लाग‍ूूोंगे। 20.5.4.1 ऄजधकतम‍40%‍ग्राईंड‍कारेज‍की‍ऄनुमजत‍दी‍जाएगी। 20.5.4.2 जनम्नजलजखत‍ुेटब,क‍बनाए‍रख‍ेजाएगं :े ताजलका‍20.2:‍टीओडी‍स्ट्कीमों‍म‍ेंुटे बक, प्लॉट‍के‍छजर‍का‍प्रकार ुटे बक, 18‍मी.‍और‍ऄजधक‍के‍मागावजधकार  कजइ‍ुेटब,क नूीं। ााली‍ुाावजजनक‍ुड़क  जबलल्डग‍लाआन‍का‍कम‍ुे‍कम‍90%‍छजर‍तक‍ जनर्नमत‍ूजगा। 18‍मी.‍मागावजधकार‍ुे‍कम‍ााली‍  6‍मी‍का‍ुेटब,क। ुड़कें‍या‍स्ट्थल‍का‍छजर‍जजुके‍ुामन‍े  ुाावजजनक‍अााजाूी‍के‍जलए‍ुेटब,क‍कज‍ूर‍ पाकव, प्राकृजतक‍नाल,े जंगल, अदद‍ू।, ुमय‍ऄनारुद्ध‍‍रखा‍जाएगा। ुमीपाती‍प्लॉट‍के‍ुाथ‍ुाझा‍छजर‍।  िजर‍म‍ेंकमी‍के‍जलए‍ाृक्षारजपण‍और‍ऄजग्न‍ ूाआड्रेंट‍ज,ुी‍जन-‍ईपयजजगताओं‍की‍ऄनुमजत‍दी‍ जाएगी। 20.5.4.3 ुदक्रय‍ऄग्रभाग‍म‍ें अकेड, कजलजनेड, िॉपफ्रंट, प,दल‍यात्री‍प्रािे ‍स्ट्थल‍/‍जनकाु, प्लाज़ा, एक्ुेु‍ पॉआंट, पारदिी‍जखड़दकयां‍अदद‍िाजमल‍ू।ैं i) 18‍मी.‍के‍मागावजधकार ााली‍ुड़कों‍के‍ुाथ‍ऄग्रभाग‍का‍कम‍ु‍े कम‍50%‍और‍ऄन्य‍ुभी‍ ुड़कों‍(ुाावजजनक‍ुड़कों‍ुजूत)‍के‍ुाथ‍कम‍ु‍े कम‍10%‍ऄग्रभाग‍कज‍ुदक्रय‍ऄग्रभाग‍के‍ रूप‍म‍ेंरूप‍म‍ें बनाए‍रखा‍जाएगा। ii) छजर‍तक‍बनाए‍गए‍भानों‍म‍ें ु‍े अग‍े जनकले‍दकुी‍जूस्ट्ुे‍कज‍बढ़ाने‍(बालकजनयां, जतरपाल‍ अदद)‍की‍ऄनुमजत‍नूीं‍दी‍जाएगी। iii) ुभी‍ााून‍ुाआड‍स्ट्रीट‍ु‍े प्राेि‍करेंगे।‍ऐु‍े स्ट्थलों‍के‍मामल‍े म,ें जूां‍कजइ‍ुाआड‍स्ट्रीट‍ ईपलब्ध‍नूीं‍ू,, ाूा‍ाँ टीओडी‍यजजना‍के‍जूस्ट्ु‍े के‍रूप‍म‍ें 12‍मीटर‍मागावजधकार ााली‍कम‍ ु‍े कम‍एक‍ुड़क‍बनाइ‍जानी‍ूजगी।‍ iv) ्ााुाजयक‍ऄग्रभाग‍का‍भूतल‍स्ट्तर‍पर‍कम‍ु‍े कम‍50%‍पारदिी‍(ऄन-रटटेड)‍ऄग्रभाग‍ ूजगा।‍अााुीय‍ऄग्रभाग‍ में‍बालकजनयां/‍बरामद‍े और‍ुदक्रय‍स्ट्थल‍ूोंग‍े जजनका‍मुख‍ ुाावजजनक‍मागावजधकार‍की‍ओर‍ूजगा।‍ v) ुभी‍ पार्ककग‍ ुंरचनाओं/पजजडयम‍ या‍ जस्ट्टल्ट‍ का‍ भू-तल‍ मख्ु य‍ ुड़कों‍ की‍ ओर‍ ुदक्रय‍ ऄग्रभाग‍के‍ुाथ‍जनर्नमत‍ूजना‍चाजूए। vi) 10‍मीटर‍ुे‍ऄजधक‍की‍उंचाइ‍ऄथाा‍दज‍मंजजल‍ुे‍ऄजधक‍की‍उंचाइ‍के‍ुभी‍भानों‍कज‍10‍ मीटर‍तक‍कम‍दकया‍जा‍ुकता‍ू।, ‍पयावप्त‍प्रकाि‍और‍खुली‍ूाा‍के‍जलए‍अाश्यक‍ऄन्य‍ दकुी‍भी‍ऐुी‍्ास्ट्था‍कज‍बनाए‍रखा‍जाएगा।150 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 20.5.5 इडब्ल्यएू ु‍(अर्नथक‍रूप‍ु‍ेकमजजर‍ाग)व ‍अााु:‍डीइ‍प्लान‍के‍मानदंडों‍के‍ऄनुुार‍टीओडी‍यजजना‍के‍भीतर‍ ऄच्छे‍इडब्ल्यूएु‍अााु‍जनर्नमत‍करेगा।‍इडब्ल्यूएु‍का‍एफएअर‍अााुीय‍एफएअर‍के‍ऄजतररि ‍ूजगा‍जज‍ यजजना‍में‍ऄजधकतम‍स्ट्ाीकायव‍अााुीय‍एफएअर‍के‍15%‍के‍रूप‍म‍ें पररकजलत‍दकया‍जाएगा।‍इडब्ल्यूएु‍ अााु‍की‍ऄपेक्षा‍कज‍यजजना‍के‍भीतर‍एक‍पृथक‍ुु-ऄजभकजल्पत‍क्षेत्र‍के‍रूप‍म‍ें पूरा‍दकया‍जाएगा, जजुमें‍ ुाावजजनक‍ूररत‍क्षेत्र‍और‍ुामाजजक‍ुुजाधाओं‍की‍ईपलब्धता‍के‍ुाथ‍कम/म्य-उंचाइ, ईच्च‍घनत्ा‍ााला‍ जनमावण‍ूजगा। 20.5.6 पार्ककग: 20.5.6.1 टीओडी यजजनाए‍ं कार‍दकए‍गए‍प्रजत‍100‍ाग‍व मीटर‍में‍एक‍कार‍के‍ुमतल्ु य‍स्ट्थान‍(इुीएु) मुूय, ा‍करेंगी‍जूां‍पार्ककग‍क्षेत्र‍का‍5%‍जूस्ट्ुा‍ऄजनाायवत:‍ुाआदकल‍और‍व्ूीलचेयर‍के‍जलए‍ जनधावररत‍ूजगा। 20.5.6.2 डीइ‍ टीओडी‍ यजजनाओं‍ के‍ भीतर‍ ुभी‍ पार्ककग‍ ुुजाधाओं‍का‍ कम‍ ु‍े कम‍ 50%‍ जूस्ट्ुा‍ ‘ुाावजजनक‍पार्ककग’‍ुुजाधा‍के‍रूप‍म‍ेंदगे ा। 20.5.6.3 पार्ककग‍क्षेत्र‍का‍कम‍ुे‍कम‍10%‍जूस्ट्ुा‍जनधावररत‍नीजत‍/‍यूबीबीएल‍के‍ऄनुुार‍आलेजक्रक‍ ााूनों‍के‍जलए‍चार्मजग‍पॉआंट‍ुे‍ल,ु‍ूजगा। 20.5.7 ऄन्य‍जनयत्रं ण 20.5.7.1 भान-जनमाणव ‍ुबं धं ी‍ऄन्य‍जनयत्रं ण: i) भान‍जडजाआन‍म‍ेंयू‍ुुजनजित‍दकया‍जाएगा‍दक‍ुभी‍अााु‍आकाआयों‍ में‍ प्राकृजतक‍ाेंरटलेिन‍ूज‍और‍कम‍ुे‍कम‍एक‍रून‍े यजग्य‍कमरे‍में‍ुूयव‍का‍ुीधा‍प्रकाि‍प्राप्त‍ ूज। ii) जूां‍आमारत‍ें बड़े‍रांजजट‍स्ट्टेिनों‍के‍जनकट‍ू‍ैं ाूााँ‍िजर‍में‍कमी‍करन‍े के‍पयावप्त‍ईपाय‍दकए‍ जाएंगे: 20.5.7.2 जाजभन्न‍ईपयजग‍पररुरों‍का‍ऄाजस्ट्थजत‍: i) पीएुपी‍ और‍ ्ााुाजयक‍ ईपयजग‍ जनचली‍ मंजजलों‍ पर‍ जस्ट्थत‍ ूोंग‍े जूां‍ पयावप्त‍ ुाावजजनक‍ऄग्रभाग‍ददया‍जाएगा। ii) बच्चों‍के‍जलए‍क्रेच‍(बाल‍देखभाल‍केन्द्र), डे‍केयर‍ुेंटर‍ज,ुी‍ुुजाधाएं‍और‍बुजुगों‍के‍जलए‍ ुुजाधाएं‍टीओडी‍यजजना‍के‍जूस्ट्ुे‍के‍रूप‍म‍ें प्रदान‍की‍जाएगं ी।‍आु‍तरू‍की‍ुुजाधाएं‍ यजजना‍के‍भीतर‍बनाइ‍गइ‍ुाावजजनक‍ुड़क‍पर‍ूोंगी‍जूां‍यजजना‍के‍ऄंदर‍जनयजजजत‍ ुाावजजनक‍ूररत‍क्षेत्र‍भी‍ुलु भ‍ूजगा। 20.5.7.3 टीओडी यजजना‍के‍भीतर‍ुााजव जनक‍ुड़कों‍ुबं धं ी‍मानदडं : i) ुभी‍नइ‍ुड़कें‍(स्ट्रीट‍फनीचर, प्रकाि‍और‍रजिनी‍और‍ुाावजजनक‍ुुजाधाएं)‍स्ट्रीट‍ जडजाआन‍जाजनयम‍(ऄनलु ग्नक‍7) के‍ऄनुुार‍ूोंगी‍और‍एमएमअइ‍के‍दकुी‍भी‍प्रस्ट्ताा‍के‍ ुाथ‍पूरी‍तरू‍ुे‍एकीकृत‍ूोंगी, प,दल‍चलने‍और‍ुाआदकल‍चलाने‍के‍ुंबंध‍म‍ें टीओडी‍ नजड‍के‍जलए‍अइज़डे पी के‍ऄनुु ार‍बनाइ‍जाएंगी। ii) ुाावजजनक‍ुुजाधाओं‍के‍जडजाआन‍म‍ें पथृ क‍चाआल्ड‍केयर‍रूम, ुाआदकल‍चालकों‍के‍जलए‍ कपड़े‍बदलन‍े के‍जलए‍स्ट्थान‍और‍पीन‍े के‍पानी‍की‍्ास्ट्था‍िाजमल‍ूजगी। iii) नेटाकव‍के‍ुाथ‍प्रत्येक‍100‍मीटर‍के‍ऄतं राल‍पर‍ुाआदकल‍पार्ककग‍की‍ुुजाधा‍दी‍ जाएगी।‍आनकी‍गणना‍इुीएु‍की‍ऄजनाायव‍ऄपक्षे ा‍के‍रूप‍म‍ेंकी‍जा‍ुकती‍ू।,[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 151 iv) टीओडी यजजनाओं‍के‍भीतर‍ुाावजजनक‍ुड़क‍नेटाकव‍कज‍अंजिक‍रूप‍ुे‍ाॉकाे, पुल‍या‍ जबलल्डग‍ब्लॉक‍के‍मा्यम‍ुे‍कार‍दकया‍जा‍ुकता‍ू,, बिते‍दक: o कार‍की‍गइ‍लंबाइ‍नेटाकव‍की‍कुल‍लंबाइ‍के‍एक-जतूाइ‍ुे‍ऄजधक‍नूीं‍ूज। o ऐुे‍ाॉकाे, पुल‍या‍जबलल्डग‍ब्लॉक‍की‍उंचाइ‍ुड़क‍के‍‍ईच्चतम‍लबद‍ु के‍भाग‍ु े स्ट्पष्ट‍ रुप‍ुे‍8‍मीटर‍उपर‍ूों। v) ऐुी‍टीओडी‍यजजनाए‍ं जजनम‍ें यजजना‍क्षेत्र‍के‍भीतर‍मेरज‍स्ट्टेिन‍िाजमल‍ूैं, ाे‍जमीन‍पर‍ या‍ुमतल‍स्ट्तर‍पर‍ुभाओं/ऄजधक‍भीड़‍के‍जलए‍प,दल‍यात्री‍प्लाज़ा‍बनाएंगे,‍ज,ुा‍भी‍ ्ाूायव‍ूज।‍आु‍तरू‍की‍यजजनाओं‍के‍जडजाआन‍म‍ें अइपीटी, बुों, जनजी‍ााूनों‍के‍जलए‍ ड्रॉप-ऑफ‍अदद‍के‍जलए‍बुए-मजडल‍एकीकरण‍ुुजाधाएं‍िाजमल‍ूजनी‍चाजूए। vi) ुड़क‍नेटाकव‍कज‍ूर‍ुमय‍ुड़क‍के‍दकनारों‍पर‍ईपयुि ‍ुााजव जनक‍गजतजाजध‍प्रजग्रालमग‍ के‍ज़ररए‍ुदक्रय‍रखा‍जाएगा‍ज,ुे‍दक‍ाेंलडग‍ज़जन, प्लाज़ा, दकु ानें, रेस्ट्तरा,ं खुली‍जगू, अदद। 20.5.7.4 ाूनीयता‍जािीे ताएाँ: i) टीओडी‍यजजनाएं,‍दद.जा.प्रा.‍द्वारा‍ऄजधुूजचत‍ुभी‍ूररत‍मानदंडों‍कज‍यजजना‍की‍मंजरू ी‍ के‍ुमय‍पूरा‍करेंगी।‍एक‍स्ट्कीम‍के‍भीतर‍ूररत‍और‍ुाावजजनक‍स्ट्थलों‍कज‍अपु‍में‍जजड़ा‍ जाएगा‍तादक‍जूां‍तक‍ुंभा‍ूज‍ग्रीन-ब्ल‍ू और‍ुाावजजनक‍स्ट्थल‍नेटाकव‍बनाया‍जा‍ुके। ii) प्रत्येक‍टीओडी यजजना‍जनम्नजलजखत‍ुुजनजित‍करेगी: o ऄपजिष्ट‍जल‍का‍100%‍ईपचार‍और‍ऄजधकतम‍पुन:ईपयजग; o ूररत‍ऄपजिष्ट‍की‍100%‍छंटाइ‍और‍ईुका‍पनु :ईपयजग;‍ o उजाव‍की‍कम‍ु‍ेकम‍10%‍मांग‍कज‍ुौर-उजाव‍ज,ुे‍नाीकरणीय‍स्रजतों‍ ुे‍ पूरा‍ दकया‍जाना‍चाजूए। o ाीाव‍जल‍कज‍लाग‍ू मानदंडों‍के‍ऄनुुार‍प्रत्यक्ष‍पुन:‍ईपयजग‍और‍भूजमगत‍जल‍के‍ पुनभवरण‍के‍जलए‍प्रयजग‍म‍ेंलाना। o ुतू‍ााली‍पार्ककग‍और‍खुल‍े म,दानों‍पर‍केाल‍पारगम्य‍ुामजग्रयों‍का‍ईपयजग‍दकया‍ जाए। ऄनेक‍यजजनाएं/डीइ आन‍ाूनीयता‍ऄपेक्षाओं‍कज‍पूरा‍करन‍े के‍जलए‍एक‍ुाथ‍अ‍ुकते‍ू।ैं 20.5.7.5 ुााभव ौजमक‍बाधा-रजूत‍पुएचाँ ‍-‍टीओडी यजजनाओं‍के‍ऄंतगवत‍ऄनुमजददत‍ुभी‍ुाावजजनक‍ स्ट्थल, ुड़कें, ूररत‍ुाावजजनक‍स्ट्थल, पार्ककग‍क्षेत्र, भान‍अदद‍और‍अइज़डे पी के‍ऄनुमजदन‍के‍ ऄनुुार‍िुरु दकए‍गए‍ुभी‍क्षत्रे ‍ुुधार‍कायों‍कज‍अााुन‍और‍िूरी‍कायव‍मंत्रालय, भारत‍ ुरकार‍ के‍ दद्ांगजन‍ एां‍ बुजुगव‍ ्जि यों‍ के‍ जलए‍ बाधा-रजूत‍ ुाावभौजमक‍ पुएचाँ ‍ के‍ ााताारण‍ूते ‍ु त,यार‍दकए‍गए‍ुुमेजलत‍ददिाजनदेि‍और‍स्ट्थान‍मानक‍के‍ऄनुुार‍जडज़ाआन‍ दकया‍जाएगा। --- x --- x ---- x --- x ---152 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] खडं ‍8 यजजना‍जनगरानी‍और‍मल्ू याकं न ऄ्याय कजड 21.0 जनगरानी‍फ्रेमाकव PME 21.1.1 िूरी‍जाकाु‍कज‍ददिा‍देन‍े के‍जलए‍ ‍एक‍दीघकव ाजलक‍दजृ ष्टकजण‍ू।, ‍यजजना‍की‍कायवनीजतयों‍का‍ बदलती‍जरूरतों‍के‍ऄनुुार‍ढलना‍और‍ईनके‍ुमनुरूप‍ूजना‍और‍यू‍ुुजनजित‍करना‍बुएत‍मूत्ापूण‍व ू‍, दक‍ िूर‍के‍जाकाु‍के‍जलए‍पूचाने‍गए‍जाज़न‍और‍लक्ष्यों‍कज‍प्राप्त‍करने‍के‍जलए‍प्रााधान‍प्राुंजगक‍और‍प्रभााी‍बन‍े रू।ें ‍आुके‍जलए‍प्रमुख‍जनष्पादन‍ुंकेतकों, ुमय-ुीमा‍और‍काय-व लबदओंु ‍का‍ुमय-ुमय‍पर‍जायजा‍लेन‍े के‍जलए‍ एक‍मजबूत‍जनगरानी‍फ्रेमाकव‍की‍अाश्यकता‍ूजगी। 21.1.2 ‍की‍जाजभन्न‍नीजतयों‍के‍कायावन्ायन‍की‍ाास्ट्तजाक‍धरातल‍पर‍ुएइ‍प्रगजत‍की‍ुतत‍जनगरानी‍की‍ जाएगी, जजुुे‍डाटा‍प्राजप्त‍और‍जाश्लीे ण‍म‍ें लगन‍े ााला‍ुमय‍कम‍ूजगा।‍ूर‍पांच‍ाी‍व म‍ें जास्ट्तृत‍ुमीक्षा‍की‍ जाएगी‍और‍यदद‍अाश्यक‍ूज‍तज‍ ‍कज‍ुंिजजधत‍भी‍दकया‍जाएगा। 21.1.3 आु‍प्रकार‍के‍गजतिील‍फ्रेमाकव‍कज‍बुए-अयामी‍दजृ ष्टकजण‍के‍मा्यम‍ुे‍ुुदढृ ‍बनाया‍जाएगा: i) केपीअइ‍‍अधाररत‍मल्ू याकं नः‍यजजना‍की‍प्रभाािीलता‍कज‍मापने‍के‍जलए‍जाजभन्न‍प्रमुख‍जनष्पादन‍ ुंकेतकों‍(केपीअइ)‍ााले‍एक‍मूल्यांकन‍फ्रेमाकव‍का‍प्रस्ट्ताा‍दकया‍जा‍रूा‍ू।, ‍केपीअइ‍िूर‍के‍ुंबंध‍ म‍ें बड़े‍पररणामों‍कज‍मापने‍पर‍केंदद्रत‍ू‍, और‍लक्ष्यों‍एा‍ं ईद्देश्यों‍कज‍प्राप्त‍करने‍के‍जलए‍आु‍मागव‍म‍ें ुुधार‍करन‍े म‍ें ुूायक‍ूोंगे। ii) बुए-एजुें ी‍ुमन्ाय:‍आुम‍ें ऄनके ‍ुंबंजधत‍एजेंजुयों‍के‍ुदस्ट्यों‍ुजूत‍जाजभन्न‍ुमन्ाय‍ुजमजतयां‍ िाजमल‍ूोंगी।‍य‍े ुजमजतयााँ‍कायावन्ायन‍की‍प्रगजत‍का‍जायजा‍लगें ी, ऄंतर-एजेंुी‍ुमन्ाय‍कज‍ ुुुा्य‍बनाएंगी‍और बाधाएं‍अने‍पर‍(यदद‍कजइ‍ूज)‍ईनका‍ुमाधान‍करेंगी। iii) डाटा‍ुाझा‍करना‍और‍प्रबधं न:‍ुंबंजधत‍जनगरानी‍एजेंजुयों‍द्वारा‍डाटा‍ुाझा‍करन‍े की‍प्रदक्रया, जाारण‍और‍अाजधकता‍तय‍करने‍के‍जलए‍एक‍डाटा‍प्रजटजकॉल‍जनधावररत‍दकया‍जाएगा‍तादक‍ यजजना‍‍जनगरानी‍के‍जलए‍अाश्यक‍डाटा‍की‍तुलना‍की‍जा‍ुके। iv) ुमर्नपत‍जनगरानी‍आकाइ:‍यजजना‍की‍प्रगजत‍की‍जनगरानी‍के‍जलए‍दद.जा.प्रा.‍म‍ें एक‍ऄंतःऄनिु ाुजनक‍ टीम‍का‍गठन‍दकया‍जाएगा। v) कायान्व ायन‍ुूायताः‍ुमुजचत‍कायावन्ायन‍के‍जलए, जाजभन्न‍स्ट्थाजनक‍नीजतयों‍(देख:ें‍भाग‍7) के‍ कायावन्ायन‍ु‍े जुड़ी‍्ााुाजयक‍प्रदक्रयाओं‍कज‍एकल‍जखड़की‍प्रणाजलयों, मजबूत‍जिकायत‍प्रबंधन‍ फ्रेमाकव‍ और‍ ाास्ट्तजाक‍ ुमय‍ में‍ र,ककग‍ करके‍ ुु्ाजस्ट्थत‍ दकया‍ जाएगा।‍ जाजभन्न‍ पररयजजनाओं/यजजनाओं‍के‍कायावन्ायन‍के‍जलए‍जूतधारकों‍कज‍तकनीकी‍ुूायता‍भी‍प्रदान‍की‍ जाएगी। 21.2 मल्ू याकं न‍फ्रेमाकव[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 153 21.2.1 यजजना‍ऄाजध‍के‍जलए‍जनधावररत‍जाज़न‍और‍लक्ष्यों‍कज‍प्राप्त‍करने‍की‍ददिा‍म‍ें ददल्ली‍द्वारा‍की‍गइ‍प्रगजत‍कज‍ जनम्नजलजखत‍प्रमुख‍जनष्पादन‍ुकं ेतकों‍(केपीअर)‍ु‍े मापा‍जाएगा: i) स्ट्थानीय‍ाायु‍प्रदीू ण‍म‍ें कमी ii) जल‍प्रदीू ण‍जनयंत्रण iii) ूररत‍क्षेत्र‍में‍ाृजद्ध iv) जलाियों‍का‍पनु रूद्धार v) बाढ़‍जजजखम‍म‍ें कमी vi) ऄपजिष्ट‍जल‍का‍पनु :‍ईपयजग vii) भूजल‍ुंाधवन viii) लैंडदफल‍दबाा‍कज‍कम‍करना ix) ऄपजिष्ट‍का‍ुंपन्नता‍में‍पररातनव ‍ x) कुल‍उजाव‍ईपयजग‍म‍ेंनाीकरणीय‍उजाव‍का‍जूस्ट्ुा xi) भूकंपीय‍ऄनुपालन xii) अग‍लगन‍े की‍घटनाओं‍ुे‍ुुरक्षा xiii) नए‍अााु‍स्ट्टॉक‍म‍ेंछजटे‍अकार‍के‍अााु‍का‍जूस्ट्ुा xiv) स्ट्लम‍पुनाावु xv) ुाावजजनक‍परराून‍के‍ईपयजग‍की‍ओर‍बढ़ना xvi) आलेजक्रक‍ााून‍कज‍ऄपनाना xvii) माना‍जाकाु‍ुूचकांक xviii) जाराुत‍ुंरक्षण xix) ुाावजजनक‍ुड़कों‍की‍जीांतता xx) कायवबल‍म‍ें मजूला‍भागीदारी 21.2.2 आन‍ुंकेतकों‍का‍जाारण‍ऄनुलग्नक‍11‍म‍ेंददया‍गया‍ू।, 21.2.3 ये‍ुंकेतक‍ ‍के‍लक्ष्यों‍ु‍े जुड़‍े तीन‍प्रमुख‍ुूचकांकों‍म‍ेंयजगदान‍करेंगे: 21.2.3.1 पयााव रणीय‍ुपं जीणीयता‍ुचू काकं :‍जज‍यजजना‍के‍लक्ष्य‍1‍(जी1)‍के‍ऄनुरूप‍ू,, 21.2.3.2 जनर्नमत‍पयााव रण‍ुचू काकं :‍जज‍यजजना‍के‍लक्ष्य‍2‍(जी2)‍के‍ऄनुरूप‍ू,,‍ 21.2.3.3 िूर‍जीातं ता-ुचू काकं (जुटी‍ााआटजलटी‍आंडेक्ु):‍जज‍यजजना‍के‍लक्ष्य‍3‍(जी3)‍के‍ऄनरूु प‍ ू।, 21.2.4 केपीअइ‍जनम्नानुुार‍आन‍ुूचकांकों‍की‍गणना‍म‍ें ुूायता‍करेगा: 21.2.4.1 दु‍मूत्ापूणव‍केपीअइ‍पयावारणीय‍ुंपजीणीयता‍ुूचकांक‍में‍यजगदान‍करत‍े ू।ैं ‍य‍े ू—ैं ‍ स्ट्थानीय‍ााय‍ुप्रदीूण‍म‍ेंकमी; जल‍प्रदीूण‍जनयंत्रण; ूररत‍क्षत्रे‍म‍ेंाृजद्ध; जलाियों‍का‍ पुनरुद्धार; बाढ़‍जजजखम‍म‍ेंकमी; ऄपजिष्ट‍जल‍का‍पनु:‍ईपयजग; भूजल‍ुंाधवन; लैंडदफल‍दबाा‍ कज‍कम‍करना; ऄपजिष्ट‍का‍ुपंन्नता‍म‍ेंपररातवन; और‍कुल‍उजाव-ईपयजग‍म‍ेंनाीकरणीय‍उजा‍व का‍जूस्ट्ुा।‍आुके‍ऄजतररि , दज‍ऄन्तःुंबजन्धत‍(क्रॉु-करटग)‍केपीअइ, ऄथावत‍्ुाावजजनक‍ परराून‍के‍ईपयजग‍की‍ओर‍बढ़ना‍और‍आलेजक्रक‍ााूनों‍कज‍ऄपनाना‍भी‍आु‍ुूचकांक‍म‍ें यजगदान‍करते‍ू।ैं154 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 21.2.4.2 छू‍मूत्ापणू व‍केपीअइ‍जनर्नमत‍पयावारण‍ुूचकांक‍म‍ें यजगदान‍करत‍े ू।ैं ‍य‍े ू—ैं भूकंपीय‍ ऄनुपालन; अग‍लगने‍की‍घटनाओं‍ु‍ेुुरक्षा; नए‍अााु‍स्ट्टॉक‍म‍ेंछजटे‍अकार‍के‍अााु‍का‍ जूस्ट्ुा; स्ट्लम‍पुनाावु; ुाावजजनक‍परराून‍के‍ईपयजग‍की‍ओर‍‍बढ़ना‍और‍आलेजक्रक‍ााूनों‍ कज‍ऄपनाना।‍आुके‍ऄजतररि , बाढ़‍जजजखम‍म‍ें कमी‍के‍रूप‍में‍ऄन्तःुंबजन्धत‍(क्रॉु-करटग)‍ पररातवनीय‍कारक‍भी‍आु‍ुूचकांक‍म‍ें यजगदान‍देता‍ू।, 21.2.4.3 चार‍मूत्ापूण‍व केपीअइ‍िूर‍की‍जीांतता-ुूचकांक‍(जुटी‍जाट,जलटी‍आंडेक्ु)‍म‍ें यजगदान‍करत‍े ू।ैं ‍ये‍ू-ैं ‍माना‍जाकाु‍ुूचकांक, जाराुत‍ुंरक्षण, ुाावजजनक‍ुड़कों‍की‍जीांतता‍और‍ कायवबल‍म‍ेंमजूला‍भागीदारी। 21.2.4.4 यजजना‍के‍कायावन्ायन‍म‍ें िूर‍की‍ुमग्र‍प्रगजत‍का‍अकलन‍करने‍के‍जलए‍एक‍्ापक‍ददल्ली‍ जनााु-यजग्यता‍ुचू काकं ‍(Liveability Index) भी‍जाकजुत‍दकया‍जाएगा।‍यू‍ुभी‍20‍ ुंकेतकों‍के‍ुंबंध‍म‍ें ुएइ‍प्रगजत‍का‍ईपयजग‍करके‍अकजलत‍दकया‍जाएगा। 21.2.4.5 ुभी‍केपीअइ‍मात्रात्मक‍ू,ैं और‍2021-41‍के‍बीच‍प्रत्येक‍5‍ाी‍व की‍ऄाजध‍के‍जलए‍ााजं छत‍ लक्ष्यों‍ु‍े तुलना‍करके‍आनका‍अकलन‍दकया‍जाएगा।‍खण्ड‍21.3‍म‍ें आंजगत‍तीन‍ुमन्ाय‍ ुजमजतयां‍यजजना‍के‍कायावन्ायन‍के‍पूल‍े ाी‍व के‍भीतर‍आन‍ाांजछत‍लक्ष्यों‍कज‍जनधावररत‍करने‍के‍ जलए‍जजम्मेदार‍ूोंगी।‍जाजभन्न‍ुंबंजधत‍जाभागों/एजेंजुयों‍के‍परामिव‍ु‍े लक्ष्य‍जनधावररत‍दकए‍ जाएंगे। 21.3 बुए-एजुें ी‍ुमन्ाय‍फ्रेमाकव 21.3.1 तीन‍ जनगरानी‍ ुजमजतयां‍नामतः‍पयावारणीय‍ ुंपजीणीयता‍ ुजमजत‍(इएु-ुीओएम), जनर्नमत‍पयावारण‍ ुजमजत‍(बीइ-ुीओएम) और‍िूर‍जीांतता‍ुजमजत‍(ुीाी-ुीओएम) गरठत‍की‍जाएंगी‍जज‍यजजना‍के‍तीन‍ लक्ष्यों‍के‍ुंबंध‍म‍ें की‍गइ‍प्रगजत‍की‍जनगरानी‍करेंगी।‍आन‍ुजमजतयों‍म‍ें ुंबंजधत‍जाभागों/एजेंजुयों‍के‍ प्रजतजनजध‍ूोंग‍ेऔर‍ईनकी‍ऄ्यक्षता‍दद.जा.प्रा.‍के‍एक‍ाररष्ठ‍ऄजधकारी‍द्वारा‍की‍जाएगी। 21.3.1.1 पयावारणीय‍ुंपजीणीयता‍ुजमजत‍(इएु-ुीओएम), ऄ्याय‍इएनाी1, इएनाी2,‍अइएनएफ1, अइएनएफ2, अइएनएफ3, अइएनएफ4, म‍ें कारवााइ‍यजग्य‍मदों‍में‍की‍गइ‍प्रगजत‍की‍जनगरानी‍ करेगी‍और‍पयावारणीय‍ुंपजीणीयता‍ुचू कांक‍ु‍े ुंबंजधत‍केपीअइ का‍जायजा‍लगे ी। 21.3.1.2 जनर्नमत‍पयावारण‍ुजमजत‍(बीइ-ुीओएम) ऄ्याय‍एुएु1, एुएु2, एमओबी1, एमओबी2, एमओबी3, एमओबी4‍म‍ें कारवााइ‍यजग्य‍मदों‍में‍की‍गइ‍प्रगजत‍की‍जनगरानी‍करेगी‍और‍जनर्नमत‍ पयावारण‍ुूचकांक‍ु‍े ुंबंजधत‍केपीअइ का‍जायजा‍लेगी। 21.3.1.3 िूर‍जीांतता‍ुजमजत‍(ुीाी-ुीओएम) ऄ्याय‍इुीओ,‍एचुीपी1, एचुीपी2‍में‍कारवााइ‍ यजग्य‍मदों‍म‍ें की‍गइ‍प्रगजत‍की‍जनगरानी‍करेगी और‍िूर‍जीांतता-ुूचकांक‍ुे‍ुंबंजधत‍ केपीअइ का‍जायजा‍लेगी। 21.3.2 आन‍ुजमजतयों‍के‍काम‍कज‍ुुजाधाजनक‍बनाने‍के‍जलए‍इएु-ुीओएम, बीइ-ुीओएम और‍ुीाी-ुीओएम के‍ ऄंतगतव ‍ईप-ुजमजतयों‍का‍गठन‍दकया‍जा‍ुकता‍ू,।‍यू‍ुजमजतयां‍ुंबंजधत‍एजेंजुयों‍कज‍लक्ष्य‍ूाजुल‍करन‍े के‍जलए‍जास्ट्ततृ ‍कायव‍यजजना‍और‍जािेी‍पररयजजनाएं‍त,यार‍करन‍े का‍जनदेि‍भी‍द‍े ुकती‍ू।ैं[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 155 21.3.3 प्रत्येक‍जनगरानी‍ुजमजत‍द्वारा‍एक‍ाार्नीक‍प्रगजत‍ररपजट‍व त,यार‍की‍जाएगी, जज‍यजजना‍के‍ाास्ट्तजाक‍धरातल‍ पर‍ुएए‍कायावन्ायन‍के‍ुंबंध‍म‍ें यथाजस्ट्थजत‍कज‍ईजागर‍करेगी‍और‍अाश्यकतानुुार‍ुुधार‍के‍जलए‍ईपाय‍ ुुझाएगी।‍ 21.3.4 तीनों‍जनगरानी‍ुजमजतयााँ‍ददल्ली‍के‍ईपराज्यपाल‍की‍ऄ्यक्षता‍ााली‍ऄजधकार‍‍प्राप्त-िीी‍व ुमीक्षा‍ुजमजत‍ कज‍ाार्नीक‍अधार‍पर‍ररपजट‍व करेंगी।‍िीीव‍ुजमजत‍ाार्नीक‍प्रगजत‍ररपजटों‍की‍ुमीक्षा‍करेगी, ‍ुमन्ाय‍ ुूायता‍करेगी‍और‍अाश्यकतानुुार‍यजजना‍में‍ुंिजधन‍का‍ुुझाा‍देगी। 21.3.5 जाजभन्न‍एजेंजुयों‍के‍ुमक्ष‍प्रस्ट्तुत‍दकन्ूीं‍चनु ौतीपूण‍व कायावन्ायन‍मुद्दों‍पर‍चचाव‍करन,े ‍ रजड‍म,प‍की‍ुमीक्षा‍ करने‍और‍ुमग्र‍प्रगजत‍एा‍ं भजाष्य‍की‍यजजनाओं‍और‍पररयजजनाओं‍का‍जायजा‍लेन‍े के‍जलए‍दद.जा.प्रा.‍द्वारा‍ एक‍ाार्नीक‍बुए-एजेंुी‍कायविाला‍का‍अयजजन‍दकया‍जा‍ुकता‍ू।, ‍ 21.4 डाटा‍ुाझा‍करना‍और‍प्रबधं न 21.4.1 िीीव‍ुमीक्षा‍ुजमजत‍ईन‍मुख्य‍डाटा‍लबदओंु ‍की‍ुूची‍कज‍ऄंजतम‍रूप‍देगी‍जजन्ू‍ें केपीअइ‍के‍अकलन‍के‍जलए‍ ुमय-ुमय‍पर‍प्रत्येक‍एजेंुी‍द्वारा‍जनगरानी‍और‍ुाझा‍करने‍की‍अाश्यकता‍ूजती‍ू।, ‍ुभी‍ुंबंजधत‍ एजेंजुयों‍के‍जलए‍एक‍औपचाररक‍डाटा‍िेयररग‍प्रजटजकॉल‍स्ट्थाजपत‍दकया‍जाएगा ‍जजुम‍ें डाटा‍लबदओंु , म,ररक्ु‍और‍मानकीकृत‍आकाआयों, ‍डाटा‍क,प्चर‍करन‍ेके‍जलए‍स्रजत‍और‍तरीके, ‍ररपजर्टटग‍की‍अाजधकता‍अदद‍ कज‍दिावया‍जाएगा।‍ुंबंजधत‍एजजें ुयों‍द्वारा‍आुका‍ऄजनाायवतः‍पालन‍दकया‍जाएगा। 21.4.2 दद.जा.प्रा.‍ुंबंजधत‍एजेंजुयों‍द्वारा‍प्रत्येक‍केपीअइ ु‍े ुंबंजधत‍डाटा‍ऄपलजड‍करन‍े के‍जलए‍एक‍ुमर्नपत‍ाेब‍ पजटवल‍स्ट्थाजपत‍करेगा, जजुे‍ुंबंजधत‍केपीअइ की‍जनगरानी‍करने‍ााली‍ुजमजतयों‍के‍जलए‍ईपलब्ध‍करााया‍ जाएगा। 21.5 दद.जा.प्रा.‍म‍ेंयजजना‍जनगरानी‍और‍ुमीक्षा‍आकाइ 21.5.1 दद.जा.प्रा.‍म‍ें एक‍ुमर्नपत‍यजजना‍जनगरानी‍और‍ुमीक्षा‍आकाइ‍(पीएमअरय)ू ‍स्ट्थाजपत‍की‍जाएगी‍जजुम‍ें यजजना‍ कायावन्ायन‍ के‍ जलए‍ अाश्यक‍ जाजभन्न‍ ुूायक‍ कायों‍ कज‍ पूरा‍ करने‍ के‍ जलए‍ पेिेारों‍ की‍ एक‍ ऄंतःऄनुिाुजनक‍टीम‍िाजमल‍ूजगी। 21.5.2 पीएमअरय‍ू जनम्नजलजखत‍जनदिे ात्मक‍काय‍व करेगा: i) जाजभन्न‍एजेंजुयों‍ु‍े प्राप्त‍जानकारी‍के‍अधार‍पर‍डाटा‍बैंक‍का‍जाकाु‍करना। ii) प्राप्त/ुंकजलत‍अंकड़ों‍के‍अधार‍पर‍ाार्नीक‍ुमीक्षा‍ररपजटें‍त,यार‍करना। iii) ‍(ददल्ली‍स्ट्थाजनक‍ुूचना‍प्रणाली)‍के‍जीअइएु‍डाटाबेु‍की‍‍प्रबंध-्ास्ट्था‍करना, जजुम‍ें जाजभन्न‍एजेंजुयों‍ुे‍तत्काल‍प्राप्त‍जानकारी‍(ररयल‍टाआम‍आनपुट)‍के‍ुाथ‍डाटाबेु‍कज‍ऄद्यतन‍करना, जमीनी‍ुाेक्षण, ुीएलयू‍अदद‍िाजमल‍ू।ैं iv) खंड‍21.6.2‍के‍ऄनुुार‍दद.जा.प्रा.‍द्वारा‍जाकजुत‍ऑनलाआन‍नागररक‍पजटलव ‍का‍प्रबंधन‍करना। v) ऄनेकानेक‍जाीयों‍ुे‍ुंबंजधत‍प्रमुख‍प्राृजियों,‍मुद्दों‍और‍चुनौजतयों‍का‍मूल्यांकन‍करने‍के‍जलए‍ऄ्ययन‍ करना‍ऄथाा‍करााना।‍156 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] vi) िीीव‍ुमीक्षा‍ुजमजत‍के‍जलए‍एक‍तकनीकी‍ुूायता‍आकाइ‍के‍रूप‍म‍ेंकायव‍करना। 21.6 कायान्व ायन‍ुूायता‍ 21.6.1 दद.जा.प्रा.‍यजजना‍की‍‍जाजभन्न‍स्ट्थाजनक‍जाकाु‍नीजतयों‍(ुंदभवः‍भाग‍7) के‍ुुचारू‍कायावन्ायन‍के‍जलए‍ ऑनलाआन‍एकल‍जखड़की‍तंत्र‍स्ट्थाजपत‍करेगा।‍यू‍पजटवल‍अादे न‍करन,े यजजनाओं‍म‍ें भाग‍लने े, ऄनुमजदन‍की‍ जस्ट्थजत‍पर‍नज़र‍रखन‍े अदद‍के‍जलए‍एक‍स्ट्थान‍पर‍ईपलब्ध‍ुजु ाधा‍के‍रूप‍म‍ें काय‍व करेगा। 21.6.2 दद.जा.प्रा.‍जनयजमत‍अधार‍पर‍जानकारी‍प्रदान‍करने‍के‍जलए‍तथा‍ ुाथ‍ूी‍नागररकों‍द्वारा‍दकए‍गए‍प्रश्नों‍ का‍जााब‍देने‍के‍जलए‍एक‍ऑनलाआन‍नागररक‍पजटवल‍भी‍त,यार‍करेगा‍और‍ईुे‍बरकरार‍रखगे ा।‍एक‍ ऑनलाआन‍ड,िबजडव‍भी‍पजटवल‍के‍भीतर‍िाजमल‍दकया‍जा‍ुकता‍ू‍, जजुमें‍डाटा‍के‍तत्काल‍(रीयल‍टाआम)‍ जाश्लेीण‍और‍मूत्ापूणव‍चरण/ईपलजब्धयों‍पर‍ररपजर्टटग‍िाजमल‍ूज। 21.6.3 दद.जा.प्रा.‍और‍ऄन्य‍ुरकारी‍एजेंजुयां‍िूर‍के‍जनयजजजत‍और‍ऄजनयजजजत‍दजनों‍क्षेत्रों‍म‍ें जाजभन्न‍क्षत्रे ‍ुुधार‍ पररयजजनाओं‍की‍ुंकल्पना‍तय, ार‍करन,े जडजाआन‍बनाने‍और‍जनष्पादन‍के‍जलए‍जूतधारक‍ुमूूों‍ज,ु‍े अरडब्ल्यूए, ‍माकेट‍रेडुव‍एुजजुएिन‍या‍जुजाल‍ुजुाआटी‍ुंगठनों‍कज‍तकनीकी‍ुूायता‍और‍अरंजभक‍ ुूायता‍प्रदान‍कर‍ुकती‍ू।ैं 21.6.4 दद.जा.प्रा.‍और‍ऄन्य‍ुरकारी‍एजेंजुयां,‍ाास्ट्तजाक‍स्ट्तर‍पर‍यजजना‍कायावन्ायन‍के‍प्रभााों‍कज‍ुमझने‍और‍ ईनका‍अकलन‍करन;े ‍फीडबक, ‍प्राप्त‍करन‍े और‍राय‍जानने; िूर‍के‍जलए‍जनयजजजत‍जाजभन्न‍पररयजजनाओं‍ और‍पूल‍पर‍ुुझाा‍प्राप्‍त‍करने‍तथा‍जुरटजन-जड्रान‍आनजािे न‍ूते ु‍ऄाुर‍और‍मागव‍प्रदान‍करने‍के‍जलए‍ जाजभन्न‍नागररक‍ुमूूों‍और‍जूतधारकों‍ज,ुे‍मजूलाएाँ, युाा‍अदद‍के‍ुाथ‍जनरंतर‍भागीदारी‍ुुजनजित‍ करेंगी।‍ 21.6.5 दद.जा.प्रा.‍ ुरल‍ रूप‍ म‍ें ऄक्ुर‍ पछू े‍ जान‍े ााल‍े प्रश्न‍ (एफएक्यू)‍ और‍ अइइुी‍ ुामग्री‍ त,यार‍ करेगा, ुामुदाजयक‍कायव‍द्वारा‍ुाावजजनक‍स्ट्थानों‍म‍ें ुुधार, जनर्नमत‍ााताारण‍कज‍ूरा-भरा‍करने‍अदद‍ज,ुे‍जाीयों‍ के‍जलए‍ददिाजनदेि‍जनधावररत‍करेगा‍और‍आु‍तरू‍की‍ुामग्री‍कज‍ऄपने‍ऑनलाआन‍पजटवल‍के‍मा्यम‍ु‍े जनता‍के‍जलए‍ईपलब्ध‍कराएगा। --- x --- x ---- x --- x --- x ---[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 157 खडं ‍9 जाकाु‍कजड‍और‍ जाकाु‍जनयत्रं ण‍मानदडं ऄ्याय कजड 22.0 जाकाु‍जनयत्रं ण‍मानदडं DCN जाकाु‍जनयंत्रण‍मानदडं ‍जािीे ‍प्रााधान‍ू‍, जज‍यजजना‍म‍ें जनजूत‍भूजम‍ईपयजग‍प्‍लान‍और‍नीजतगत‍रूपरेखा‍‍के‍ऄतं गतव ‍ जाकाु‍कज‍जनयंजत्रत‍‍करत‍े ू।ैं ‍यू‍ुभी‍प्‍लॉटज/‍एकीकृत‍स्ट्‍कीमों/क्षेत्रों‍पर‍लाग‍ू ूजत‍े ू‍ैं और‍आुमें‍ुभी‍स्ट्थ‍ लों‍पर‍ुमुजचत‍ जाकाु‍कज‍प्रजत्‍ुाजूत‍करके‍जनर्नमत‍और‍प्राकृजतक‍ााताारण‍की‍गुणात्‍ता‍म‍ेंुुधार‍करन‍े के‍पररकल्‍पना‍ू।, कजइ‍भी‍जाकाु,‍जास्ट्‍तार,‍ईपयजग‍रूपांतरण‍नाीन‍ऄथााजाद्यमान,‍ईपयजग‍पररातवन,‍ुाआट‍पररातवन‍स्ट्थ‍ ानांतरण,‍ पुनजनमावण‍तथा‍ऄन्‍य‍कजइ‍भान‍ऄथाा‍ऄन्‍य‍ुंरचना‍आन‍मानदंडों‍द्वारा‍िाजुत‍ूोंगी।‍ 22.1 ददल्ली‍2041‍के‍जलए‍भूजम‍ईपयजग‍यजजना‍ 22.1.1 ददल्ली‍मुख्य‍यजजना-2041‍(एमपीडी-2041)‍के‍जलए‍भूजम‍ईपयजग‍प्लान‍कज जीअइएु‍(भौगजजलक‍ुूचना‍ प्रणाली)‍प्लेटफॉमव‍पर‍भूजम/ुाआट‍की‍मौजूदा‍जस्ट्थजत‍कज‍्यान‍में‍रखते‍ुएए‍त,यार‍दकया‍गया‍ू।, ‍ददल्ली‍कज‍18 जनयजजन‍क्षेत्रों‍म‍ें जाभाजजत‍दकया‍गया‍ू।, ‍अधार‍मानजचत्र‍म,ें केंद्र‍ुरकार‍द्वारा‍ऄजधुूजचत‍भूजम‍के‍ईपयजग, जजनल‍ुीमाओं‍ुे‍ुंबंजधत‍ऄजत्ापी‍मुद्दों, मौजूदा/प्रस्ट्ताजात‍ुड़कों‍की‍जनरंतरता, ाास्ट्तजाक‍ुाआट‍की‍जस्ट्थजत‍ के‍ऄनुुार‍भूजम‍के‍ाास्ट्तजाक‍अकार‍और‍अकृजत‍का‍ईपयजग/ईपयजग‍क्षेत्रों‍का‍ुुधार, अंचजलक‍यजजना‍की‍ ुीमाओं‍कज‍पररष्कृत‍करना‍अदद‍मास्ट्टर‍प्लान‍म‍ेंूल‍दकए‍गए‍और‍िाजमल‍दकए‍गए‍ू।ैं 22.1.2 राष्ट्रीय‍राजधानी‍क्षेत्र‍ददल्ली‍की‍म,लपग‍कज‍ुमय-ुमय‍पर‍ऄद्यतन‍दकया‍जाएगा, जजुमें‍ुाावजजनक‍भूजम‍पर‍ ऄजतक्रमण‍ुजूत‍ऄनजधकृत‍जाकाु‍का‍पता‍लगाने‍और‍रजकने‍के‍जलए‍भूजम‍की‍जस्ट्थजत‍के‍ुंबंध‍में‍मूल्याान‍डेटा‍ िाजमल‍ूजगा‍और‍यू‍ूररत‍क्षत्रे ों‍के‍ुंरक्षण‍कज‍ुुजाधा‍प्रदान‍करेगा। 22.1.3 जाकाु‍कज‍जनयंजत्रत‍करन‍े के‍जलए, जाकाु‍ुंजूता‍में‍27 ईपयजग‍जजन‍म‍ें क्षेत्रों‍की‍पूचान‍की‍गइ‍ू।, ‍आन‍ ईपयजग‍ जजनों‍ कज‍ अााुीय, ्ााुाजयक, औद्यजजगक, मनजरंजनात्मक, परराून, ईपयजजगता, ुरकारी, ुाावजजनक‍और‍ऄध-व ुाावजजनक‍ुुजाधाओं‍और‍ग्रीन‍बेल्ट तथा‍जलािय‍ज,ुे‍भूजम‍ईपयजग‍की‍नौ‍श्रेजणयों‍म‍ें प्रमुख‍तौर‍पर‍ागीकृत‍दकया‍गया‍ू।, ‍आन‍ईपयजग‍जजनों‍में‍जाकाु, जनयमों‍के‍ऄनुुार‍दकया‍जाएगा, ज,ुा‍दक‍ जाकाु‍ुंजूता‍और‍ुंबंजधत‍ऄ्यायों‍में‍जनर्ददष्ट‍दकया‍गया‍ू।, 22.2 जजनल‍जाकाु‍यजजनाएाँ 22.2.1 मुख्य‍ ‍यजजना‍2041 में‍राष्ट्रीय‍राजधानी‍क्षेत्र‍ददल्ली‍कज‍18 यजजना‍जजनों‍(जडाीजनों)‍म‍ें जाभाजजत‍दकया‍गया‍ ू,, जजन्ू‍ें 'ए' ुे‍'पी' (जजन‍'अइ' कज‍छजड़कर)‍तक‍जनर्ददष्‍ट‍दकया‍गया‍ू।, ‍ 22.2.2 जजनल‍यजजनाएं‍लेअईट‍यजजना‍और‍मास्ट्टर‍प्लान‍के‍बीच‍कड़ी‍के‍रूप‍म‍ें कायव‍करेंगी।‍जाजभन्न‍ईपयजग‍पररुरों‍ कज‍आंजगत‍करन‍े ााली‍जाकाु‍यजजनाएं‍और‍लेअईट‍यजजनाएं, मास्ट्टर‍प्लान‍/‍जजनल‍यजजनाओं‍के‍ऄनरूु प‍ूोंगी।158 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 22.2.3 दकुी‍भी‍क्षेत्र‍की‍जजनल‍यजजना‍के‍ऄभाा‍म,ें मुख्य‍ ‍यजजना‍के‍प्रााधानों‍के‍ऄनुुार‍जाकाु‍दकया‍जाएगा।‍ ददल्ली‍जाकाु‍ऄजधजनयम, 1957‍के‍ऄनुुार‍मख्ु ‍य‍यजजना‍म‍ें भूजम‍ईपयजग‍/‍ुंिजधन‍के‍जबना‍दकुी‍भी‍िूरी‍ गजतजाजध‍की‍ऄनुमजत‍नूीं‍दी‍जाएगी। जजनाार‍ऄनुमाजनत‍क्षेत्र‍का‍जाारण‍जनम्नानुुार‍ूः, ताजलका‍22.1:‍जजन‍ाार‍क्षेत्र क्र.ु.ं‍ जजन जजन‍का‍नाम क्षत्रे ‍(ूक्े टेयर) 1 ए चारदीाारी‍िूर‍+‍चारदीाारी‍िूर‍के‍ऄजतररि ि ‍ 540.65+628.42=1169.07 (ओडब्ल्यूुी) 2 बी जुटी‍एक्ुटेंिन‍(करजल‍बाग)‍ 2317.05 3 ुी जुजाल‍लाआन 3991.73 4 डी नइ‍ददल्ली 6657.30 5 इ रांु‍यमुना 8567.96 6 एफ दजक्षणी‍ददल्ली-I 11088.82 7 जी पजिमी‍ददल्ली-I 12311.22 8 एच ईिर‍पजिमी‍ददल्ली-I 5452.84 9 ज े दजक्षणी‍ददल्ली-II 15519.67 10 के-I पजिमी‍ददल्ली-II‍ 6461.91 11 के-II द्वारका‍ 5708.44 12 एल पजिमी‍ददल्ली-III‍ 22108.97 13 एम ईिर‍पजिमी‍ददल्ली-II 5594.68 14 एन ईिर‍पजिमी‍ददल्ली-III 14015 15 ओ-I* यमुना‍जजन‍(ुदक्रय‍बाढ़‍जनर्नमत‍क्षेत्र)‍‍ 6295.00 जनयंजत्रत‍(रीार‍फ्रंट)‍ 16 ओ-II* 3638.36 17 पी-I नरेला‍ 9623.26 ईिरी‍ददल्ली‍ 18 पी-II 8128.92 रटप्पणीः *ईपरजि ‍ क्षत्रे ‍ ऄनमु ाजनत‍ ू‍ैं और‍ जीअइएु‍ के‍ ऄनुुार‍ ू।ैं ‍ प्राजधकरण‍ के‍ ऄनुमजदन‍ के‍ ुाथ‍ जजन‍ का‍ पुनःपररुीमन‍और‍ररजजलनग‍दकया‍जा‍ुकता‍ू।, 22.3 भूजम‍ईपयजग‍और‍ईपयजग‍जजन 22.3.1 राष्ट्रीय‍राजधानी‍क्षेत्र‍ददल्ली‍कज‍नौ‍(9) भूजम‍ईपयजग‍श्रेजणयों‍में‍जाभाजजत‍दकया‍गया‍ू‍,ज,ुा‍दक‍ताजलका‍22.2 में‍ार्नणत‍ू।, ‍प्रत्येक‍भूजम‍ईपयजग‍श्रणे ी‍कज‍ईपयजग‍जजनों‍की‍ुंख्या‍प्रदान‍की‍गइ‍ू,, जजुे‍अग‍े ईपयजग‍पररुरों‍ की‍अाश्यक‍ुंख्या‍में‍ईप-जाभाजजत‍दकया‍जाएगा।‍ईपयजग‍जजनज‍में‍ुे‍कजइ‍भी‍एक‍या‍एक‍ुे‍ऄजधक‍स्ट्थानों‍ पर‍ऄाजस्ट्थत‍ूज‍ुकत‍े ू,ैं ज,ुा‍दक‍भूजम‍ईपयजग‍यजजना‍में‍जनर्ददष्ट‍दकया‍गया‍ू।, ‍ईपयजग‍जजनों‍के‍जाजभन्न‍ पॉकेट्‍ु‍की‍ुीमाओं‍कज‍भूजम‍ईपयजग‍यजजना‍म‍ेंपररभाजीत‍दकया‍गया‍ू।,[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 159 ताजलका‍22.2:‍भूजम‍ईपयजग‍और‍ईपयजग‍जजन क्र.ु.ं भजू म‍ईपयजग 1 अााुीय‍ अरडी* अााुीय‍क्षेत्र‍ अरएफ जादेिी‍जमिन 2 ्ााुाजयक‍ ुी1 खुदरा‍खरीदारी, ुामान्य‍्ापार‍और‍्ाुाय, जडजस्ट्रक‍ ुेंटर, कम्‍यजु नटी‍ुेंटर, ग,र-श्रेणीबद्ध‍्ााुाजयक‍केंद्र‍ ुी2 थजक‍और‍भांडागारण,‍कजल्ड‍स्ट्टजरेज‍और‍तेल‍जडपज‍ ुी3 ूजटल‍ 3 औद्यजजगक एम1 जाजनमावण, ुेाा‍ईद्यजग‍और‍मरम्मत‍ईद्यजग‍ 4 मनजरंजन पी1 क्षेत्रीय‍पाकव‍ पी2 जुटी‍पाकव, जडजस्ट्रक्ट‍‍पाकव, ुामुदाजयक‍पाकव, बुएईद्देश्यीय‍ म,दान‍‍ पी3 ऐजतूाजुक‍स्ट्मारक‍/‍पुरातत्ा‍पाकव‍ पी4 ग्रीन‍बफर‍ पी5 खेल‍ुुजाधाएं‍/‍पररुर‍ 5 परराून‍ टी1 एयरपजटव‍ टी2 टर्नमनल‍/‍जडपज‍-‍रेल‍/‍एमअरटीएु‍/‍बु‍/‍रक,‍याड‍व‍ टी3 ुकुवलेिन‍-‍रेल‍/‍एमअरटीएु‍/‍रजड‍/‍अरअरटीएु‍/‍ूाइ‍ स्ट्पीड‍रेल 6 ईपयजजगता यू1 पानी‍(रीटमेंट‍प्लांट‍अदद) यू2 ुीारेज‍(रीटमेंट‍प्लांट‍अदद) यू3 जबजली‍(पाार‍ूाईु,‍ुब-स्ट्टेिन‍अदद) यू4 ठजु‍ऄपजिष्ट‍(ईपचार, अदद) यू5 नाली यू6 ऄन्य‍ईपयजजगताएाँ‍‍ 7 ुरकारी‍ जी1 प्रेुीडेंट‍एस्ट्‍टेट‍और‍ुंुद‍भान‍ जी2 ुरकारी‍कायावलय‍पररुर‍/‍न्यायालय‍/‍पीएुयू‍ जी3 ुरकारी‍भूजम‍(ऄजनधावररत‍ईपयजग)‍ 8 ुाावजजनक‍ और‍ ऄध-व पीएु1 स्ट्ाास्ट््य, जिक्षा‍ और‍ ऄनुुंधान‍ जािजाद्यालय‍ /‍ ुाावजजनक‍ जािजाद्यालय‍ केंद्र, कॉलेज, ुामाजजक‍ -‍ ुांस्ट्कृजतक, ुामाजजक‍ ुांस्ट्कृजतक‍ पररुर‍ /‍ केंद्र, पुजलु‍ /‍ पुजलु‍ मुख्यालय‍/‍पुजलु‍लाआंु, फायर‍स्ट्टेिन‍/‍अपदा‍प्रबधं न‍ केंद्र, धार्नमक, दफन‍भूजम‍/‍कजब्रस्ट्तान‍/‍श्मिान‍ पीएु2 रांुजमिन‍ुाआट‍/‍केंद्र 9 ग्रीन‍बल्े ट‍और‍जलािय ए1 ग्रीन‍बल्े ट‍ ए2 नदी‍जजन‍(ुदक्रय‍बाढ़‍क्षेत्र‍)‍जलािय‍और‍प्राकृजतक‍नाले‍160 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] नजटः 1. *ज,ुा‍दक‍राजस्ट्ा‍जाभाग, जीएनुीटीडी‍द्वारा‍ऄजधुूजचत‍ू,, ग्राम‍अबादी‍(लाल‍डजरा/दफरनी)‍और‍ जास्ट्ताररत‍लाल‍डजरा‍का‍भूजम‍ईपयजग, जज‍दकुी‍भी‍ईपयजग‍जजन‍में‍ऄाजस्ट्थत‍ूज, अााुीय‍ू।, 2. भूजम‍ईपयजग‍यजजना‍म‍ेंजमजश्रत‍ईपयजग‍जजन‍म‍ेंएक‍ुे‍ऄजधक‍ईपयजग‍जजन‍िाजमल‍ूज‍ुकते‍ू।ैं 22.4 स्ट्थाजनक‍जाकाु 22.4.1 ग्रीन‍फील्ड‍ ‍और‍ब्राईनफील्ड‍ ‍क्षत्रे ों‍के‍जलए‍स्ट्‍थाजनक‍जाकाु‍कज‍जािेी‍स्ट्‍थाजनक‍जाकाु‍नीजत‍(डी‍इ‍ाी‍1,2,3,4)‍ के‍द्वारा‍िाजुत‍दकया‍जाएगा। 22.4.2 यजजना‍व्‍याुाय‍प्रजत्‍ुाून‍जजलज‍(बीपीडी),‍पारगमन‍ईन्‍मखु ‍जाकाु‍(टीओडी),‍लडैं पूललग‍क्षेत्र,‍ूररत‍जाकाु‍ क्षेत्र‍अदद‍ज,ुे‍ओार‍ले‍लजनों‍की‍पूचान‍करती‍ू।, ‍ये‍जजन‍स्ट्‍थाजनक‍जाकाु‍नीजत‍में‍जनर्ददष्‍ट‍दकए‍गए‍लाग‍ू मानदंडों‍के‍ऄनुुार‍जािेी‍प्रकार‍के‍जाकाु‍कज‍ुुदढ़ृ ‍करेगी।‍ 22.5 यजजनाओं‍की‍स्ट्ाीकृजत 22.5.1 लेअईट‍यजजना/ुाआट‍यजजना‍और‍भान‍यजजना‍कज‍स्ट्थानीय‍जनकायों‍और‍ईनके‍ऄजधकार‍क्षेत्र‍म‍ें अन‍े ााल‍े प्राजधकरण‍द्वारा‍ऄनुमजददत‍दकया‍जाएगा। 22.5.2 कारेज‍/‍एफएअर‍की‍ुीमा‍ुे‍यौजगक‍जाचलन‍ूते ‍ु ऄनुमये ‍कारेज‍और‍एफएअर‍के‍5%‍की‍ुीमा‍तक‍ जुमावना‍लगान‍े के‍बाद‍प्राजधकरण‍/‍स्ट्थानीय‍जनकाय(यों)‍कज‍ुिि ‍दकया‍जाएगा, जज‍पूरा‍ूजन/े ऄजधभजग‍ प्रमाणपत्र‍पर‍जाचार‍करत‍े ुमय‍भानों/पररुरों‍म‍ें ऄजधकतम‍13.5 ागवमीटर‍की‍ित‍व के‍ऄधीन‍ूजगा।‍ुमूू‍ अााु‍यजजनाओं‍और‍ुाावजजनक‍तथा‍ऄधव-ुाावजजनक‍ुुजाधाओं‍म,ें ऄनुमेय‍एफएअर‍ु‍े ईपर‍5%‍एफएअर, पूरा‍ूजन‍े /‍ऄजधभजग‍प्रमाण‍पत्र‍पर‍जाचार‍करन‍े के‍ुमय‍प्राजधकरण/स्ट्थानीय‍जनकाय‍द्वारा‍ुंयजजजत‍दकया‍जा‍ ुकता‍ू।, 22.5.3 जूां‍ कूी‍ अाश्यक‍ ूज, दद.जा.प्रा.‍ की‍ तकनीकी‍ ुजमजत‍ जचजन्ूत‍ दकए‍ गए‍ ऄनुुार‍ लेअईट‍ यजजनाओं, ्ापक/एकीकृत‍यजजनाओं‍और‍पनु ुृवजन‍यजजनाओं‍कज‍ऄनमु जदन‍प्रदान‍करन‍े के‍जलए‍नीजतगत‍ददिाजनदेि‍ त,यार‍करेगी।‍तकनीकी‍ुजमजत‍कज‍जाकाु‍ुंगठनों/स्ट्थानीय‍जनकायों‍ुे‍यजजनाएं‍अमंजत्रत‍करने‍ूते ु‍और‍जूा‍ं भी‍अाश्यक‍ूज, जनदेि/जुफाररिें‍देने‍के‍जलए‍ुिि ‍दकया‍जाएगा।‍पुरानी‍पुनर्नाकाु‍यजजनाओं‍कज‍पुनुृवजन‍ यजजनाओं‍के‍नाम‍ुे‍जाना‍जाएगा। 22.5.4 ईपयजग‍पररुर‍की‍ऄाजस्ट्थजत, ुीमाओं‍और‍प्रमुख‍ईपयजग‍म‍ेंदकुी‍भी‍पररातवन‍कज‍जाजधात‍ऄनुमजददत‍दकया‍ जाएगा‍और‍लअे ईट‍यजजना‍म‍ेंिाजमल‍दकया‍जाएगा। 22.5.5 प्राजधकरण‍ऄथाा‍काननू ‍के‍ऄनुुार‍दकुी‍ऄन्य‍स्ट्थानीय‍प्राजधकारी‍द्वारा‍पूल‍े ुे‍ऄनुमजददत‍लेअईट‍यजजना, जाजधात‍ऄनुमजददत‍यजजना‍मानी‍जाएगी।‍कजइ‍ऐुा‍क्षेत्र‍जजुके‍ुंबंध‍म‍ें कजइ‍स्ट्ाीकृत‍लअे ईट‍यजजना‍नूीं‍ू,, ाू‍मास्ट्टर‍प्लान/जजनल‍जाकाु‍यजजना‍के‍प्रााधानों‍द्वारा‍ऄजभिाजुत‍ूजगा।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 161 22.5.6 ुभी‍लेअईट‍यजजनाओं/एकीकृत‍यजजनाओं‍ुे‍ुंबंजधत‍ुेाा‍यजजना‍ुभी‍भौजतक‍ऄधजुंरचनाओं‍के‍प्रााधान‍के‍ जलए, ज,ुे‍दक‍पानी‍की‍अपूर्नत, ुीारेज, जल‍जनकाुी‍अदद, नगरपाजलका‍जनयमााजलयों‍/‍ुेाा‍प्रदाता‍एजेंुी‍ के‍ऄनरूु प‍ूोंगे। 22.5.7 जूााँ‍मुख्य‍ ‍यजजना/जजनल‍यजजना, ऄथाा‍कजइ‍ऄन्य‍जाजनयमों‍द्वारा‍भूजम‍ईपयजग‍रूपांतरण‍कज‍पररुर‍स्ट्तर‍पर‍ ुक्षम‍दकया‍जाता‍ू,, ाूां‍ुरकार‍द्वारा‍ुमय-ुमय‍पर‍जनधावररत‍दकए‍गए‍रूपांतरण‍िल्ु क‍/‍ऄन्य‍प्रभारों‍का‍ भुगतान‍करना‍ूजगा। 22.5.8 स्ट्थाजनक‍जाकाु‍के‍मामले‍म,ें‍यजजना‍और‍ऄनुमजदन‍के‍जलए‍जनधावररत‍न्यूनतम‍क्षेत्र‍आु‍ुंबधं ‍म‍ें लागू‍नीजत‍के‍ ऄनुुार‍ूजगा। 22.5.9 ले‍अईट‍और‍जबलल्डग‍प्ल‍ ान‍ऄनुमजदन‍के‍जलए‍जाजभन्‍न‍नीजतयों‍के‍ऄंतगवत‍यथा‍जनर्ददष्ट‍‍ऄपेजक्षत‍प्ल‍ ान‍ अाश्‍यक‍रूप‍ु‍ेजरूरी‍ूोंगें।‍ 22.5.10 ‍अााुीय‍‍ईपयजग‍जजन‍के‍ऄंतगतव ‍ऄपेजक्षत‍ुामाजजक‍ऄाुंरचना‍के‍प्रााधान‍10000‍जनुंख्य‍ ा‍के‍नगर‍ स्ट्‍तरीय‍मानदंडों‍द्वारा‍िाजुत‍ूोंगे।‍ 22.6 ुुजाधाओं‍की‍श्रेणी‍ ईजचत‍और‍ुुजनयजजजत‍जाकाु‍के‍प्रयजजन‍के‍जलए‍स्ट्थानीय‍स्ट्तर‍ुे‍िूरी‍स्ट्तर‍तक‍की‍रेंज‍की‍जाकाु‍श्रेजणयों‍ के‍जाजभन्न‍स्ट्तर‍तक‍ऄजनााय‍व और‍ुूायक‍ुुजाधाए‍ं प्रदान‍करन‍े की‍अाश्यकता‍ूजगी।‍ुभी‍ऄपेजक्षत‍ुुजाधाओं‍ के‍जलए‍यजजना‍मानक‍जनम्न‍प्रकार‍ुे‍ूः, -‍ ‍‍ प्रजत‍यजू नट प्रदान‍दकया‍जाएगा स्ट्तर ुजु ाधाए ं प्लॉटों‍की‍ुख्ं या ‍क्षत्रे फल एलओपी जडे डीपी जबना‍बडे ‍के‍स्ट्ाास्ट््य‍ 1 @ 10,000 न्यूनतम 800 ागव‍मीटर √ ुाे ाए ं लर्मनग‍ुटें र / क्रेच 1 @ 10,000 न्यूनतम 500 ागव‍मीटर √ स्ट्कूल (टाइप-I) 1 @ 10,000 रेंज‍- 2000-4000 ागव‍मीटर √ स्ट्कूल (टाइप-II) 1 @ 10,000 न्यूनतम 4000-8000 ागव‍मीटर √ ुामाजजक-ुास्ट्ं कृजतक‍ स्ट्थानीय‍स्ट्तर‍ 1 @ 10,000 रेंज‍800 – 2000 ागव‍मीटर √ ुजु ाधा(टाइप-I) पॉप: 10000‍ ऄन्य‍ुामदु ाजयक‍ तक 2 @ 10,000 न्यूनतम 400 ागव‍मीटर √ ुजु ाधा (टाइप-I) स्ट्थानीय‍स्ट्तर‍खले ‍ 1 @ 10,000 न्यूनतम 5000 ागव‍मीटर √ क्षत्रे ‍ यातायात‍और‍पजु लु‍ अाश्यकता‍ऄनुुार ऄजधकतम 25 ागव‍मीटर जनयत्रं ण‍कक्ष‍ पजु लु‍चौकी अाश्यकता‍ऄनुुार ऄजधकतम 150 ागव‍मीटर √162 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] प्रजत‍यजू नट प्रदान‍दकया‍जाएगा स्ट्तर ुजु ाधाए ं प्लॉटों‍की‍ुख्ं या ‍क्षत्रे फल एलओपी जडे डीपी पीएडं टी‍ुजु ाधा‍ अाश्यकता‍ऄनुुार √ (टाइप-I) जमल्क‍बथू / जमल्क,‍ फल‍एा‍ंुब्जी‍बथू ुंबंजधत‍जाभाग‍के‍मानक‍ /ददल्ली‍दग्ु ध‍अपर्नू त‍ 1 @ 5,000 √ जडजाआन‍के‍ऄनुुार बथू B/ फेयर‍प्राआु‍ िॉप टॉट‍लॉट‍ 40 @ 10,000 न्यूनतम 125 ागव‍मीटर √ स्ट्थानीय‍स्ट्तर‍पाकव 1 @ 10,000 न्यूनतम 1 ू.े √ थ्री‍व्ूीलर‍और‍टेक्ुी‍ 1 @ 10,000 न्यूनतम 400 ागव‍मीटर √ स्ट्टेंड बु‍टर्नमनल 1 @ 10,000 न्यूनतम 1000 ागव‍मीटर √ ुजु ाधा‍बाजार‍केंद्र 1 @ 5,000 न्यूनतम 1000 ागव‍मीटर √ स्ट्थानीय‍बाजार‍केंद्र 1 @ 10,000 न्यूनतम 3000 ागव‍मीटर √ ुर्नाु‍माकेट 1 @ 10,000 न्यूनतम 2000 ागव‍मीटर √ √ ऄनौपचाररक‍ुक्े टर‍ 1 @ 10,000 न्यूनतम 1000 ागव‍मीटर √ माकेट जबना‍बडे ‍के‍स्ट्ाास्ट््य‍ ुाे ाए ं(पि‍ु 1 @ 1 लाख न्यूनतम 300 ागव‍मीटर √ जचदकत्ुा) स्ट्ाास्ट््य‍ुजु ाधा‍ 6 @ 1 लाख न्यूनतम 1000 ागव‍मीटर √ (लघ)ु ऄस्ट्पताल‍ 3 @ 1 लाख रेंज-0.2 ु े 1.5 ूक्े ट. √ √ ुामाजजक-ुास्ट्ं कृजतक‍ 2 @ 1 लाख न्यूनतम 1000 ागव‍मीटर √ ुजु ाधा(टाइप-II) पजु लु‍चौकी‍ 1 @ 1 लाख ऄजधकतम 2500 ागव‍मीटर √ ुामदु ाजयक‍स्ट्तर‍ ऄजग्निमन‍पजस्ट्ट 1 @ 1 लाख ऄजधकतम 2500 ागव‍मीटर √ पॉप‍: तक‍1 र,न‍बुरे ा‍ 1 @ 1 लाख न्यूनतम 100 ागव‍मीटर √ लाख‍ ुामदु ाजयक‍खले ‍केंद्र 1 @ 1 लाख रेज- 1.0 to 3.0 ूक्े ट. √ ुामदु ाजयक‍ पाकव‍ 1 @ 1 लाख न्यूनतम 3.5 ूक्े ट. √ ुामदु ाजयक‍ 1 @ 1 लाख न्यूनतम 2.0 ूक्े ट. √ √ बुएईद्देिीय‍मद, ान‍ बकु कग‍कायालव य‍ न्यूनतम 600 ागव‍मीटर ुजूत‍एलपीजी‍ अाश्यकता‍ऄनुुार (पीइएुओ‍के‍लागू‍मानकों‍के‍ √ गजदाम प्रााधानों‍के‍ऄनुुार) बु‍टर्नमनल‍ 1 @ 1 लाख न्यूनतम 1000 ागव‍मीटर √ बुों,‍एलएमाी,‍ 2 @ 1 लाख न्यूनतम 3000 ागव‍मीटर √[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 163 प्रजत‍यजू नट प्रदान‍दकया‍जाएगा स्ट्तर ुजु ाधाए ं प्लॉटों‍की‍ुख्ं या ‍क्षत्रे फल एलओपी जडे डीपी अइपीटी‍अदद‍की‍ पार्ककग‍के‍जलए‍ पार्ककग‍स्ट्पुे √ ुामदु ाजयक‍ केंद्र‍ 1 @ 1 लाख न्यूनतम 2.0 ूक्े ट. √ ऄस्ट्पताल‍ 3 2 @ 5 लाख न्यूनतम 1.5 ूक्े ट. √ √ डी-एजडक्िन/ 1 @ 5 लाख न्यूनतम 2000 ागव‍मीटर √ रीूज, बलिे न‍केंद्र‍ पि‍ुजचदकत्ुा‍ 1 @ 5 लाख न्यूनतम 2000 ागव‍मीटर √ ऄस्ट्पताल‍ जािीे स्ट्कूल 4 @ 5 लाख न्यूनतम 2000 ागव‍मीटर √ ऄनुु धं ान‍एा‍ं 1 @ 5 लाख न्यूनतम 4000 ागव‍मीटर √ √ जाकाु‍केंद्र‍ ुस्ट्ं थान‍‍ 1 @ 5 लाख न्यूनतम 4000 ागव‍मीटर √ √ As per UGC/ AICTE कॉलजे ‍ 2 @ 5 लाख √ Norms ुामाजजक-ुास्ट्ं कृजतक‍ 1 @ 5 लाख न्यूनतम 5000 ागव‍मीटर √ ुजु ाधा‍(टाइप-III) ऄन्य‍ुामदु ाजयक‍ 5 @ 5 लाख न्यूनतम 1000 ागव‍मीटर √ ईप-िूरी‍स्ट्तर‍ ुजु ाधा (टाइप-II) पॉप: 5 लाख‍तक‍ जजला‍खले केंद्र‍ 1 @ 5 लाख रेंज‍‍- 3.0 to 10.0 ूक्े ट. √ पजु लु‍स्ट्टेिन‍ 2 @ 5 लाख ऄजधकतम‍ 1.0 ूक्े ट. √ √ ऄजग्निमन‍स्ट्टेिन 2 @ 5 लाख ऄजधकतम‍ 1.0 ूक्े ट. √ √ अपदा‍प्रबधं न‍आकाइ 1 @ 5 लाख रेंज‍‍- 0.5 to 1.0 ूक्े ट. √ िमिान‍घाट 1 @ 5 लाख न्यूनतम 5000 ागव‍मीटर √ आनजे क्रक‍ 1 @ 5 लाख न्यूनतम 5000 ागव‍मीटर √ क्रीमटे जररयम‍ जजला‍पाकव‍ 1 @ 5 लाख न्यूनतम 25 ूक्े ट. √ जजला‍बुएद्दिे ीय‍ 1 @ 5 लाख न्यूनतम 4.0 ूक्े ट. √ मद, ान‍ बु‍टर्नमनल‍ 1 2 @ 5 लाख न्यूनतम 2000 ागव‍मीटर √ √ बु‍जडपज 1@ 5 लाख न्यूनतम 4000 ागव‍मीटर √ √ ईंधन‍स्ट्टेिन अाश्यकता‍ऄनुुार डीुीएन‍के‍ऄनुुार √ जजला‍केंद्र‍ 1@ 5‍लाख न्यूनतम 10 ूक्े ट. √ √ अाश्यकता‍ऄनुुार भारतीय‍जचदकत्ुा‍पररीद‍्और‍ िूर‍स्ट्तर मजे डकल कॉलजे ‍ √ भारतीय पिु‍जचदकत्ुा‍पररीद‍्164 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] प्रजत‍यजू नट प्रदान‍दकया‍जाएगा स्ट्तर ुजु ाधाए ं प्लॉटों‍की‍ुख्ं या ‍क्षत्रे फल एलओपी जडे डीपी मानदंड पि‍ुजचदकत्ुा‍ अाश्यकता‍ऄनुुार भारतीय‍पि‍ु जचदकत्ुा‍पररीद ्/‍ √ ुस्ट्ं थान‍‍ मंत्रालय‍मानदंड ऄतं राष्ट्रव ीय‍जिक्षा‍केंद्र‍ अाश्यकता‍ऄनुुार यूजीुी /एअइुीटीइ‍मानदडं ों‍ (अइइुी) ‍ुजूत‍ √ के‍ऄनुुार यजू नार्नुटी‍क,म्पु ुामाजजक-ुास्ट्ं कृजतक‍ अाश्यकता‍ऄनुुार √ ुजु ाधा‍(टाइप-IV)* िूर‍स्ट्तर‍के‍खले ः‍ 1 @ 10 लाख‍और‍ िूर‍स्ट्तर‍के‍खले ः न्यूनतम 10 ूक्े ट. √ ईुुे‍ऄजधक‍ प्रादजे िक‍खले केंद्र‍* ऄन्य‍ुामदु ाजयक‍ अाश्यकता‍ऄनुुार न्यूनतम 2000 ागव‍मीटर √ √ ुजु ाधा (टाइप-III) ऄन्य‍ुामदु ाजयक‍ अाश्यकता‍ऄनुुार √ ुजु ाधा (टाइप-IV) जजला‍न्यायालय 1 @ 50 लाख‍ न्यूनतम 2 ूक्े ट. √ पजु लु‍लाआंु अाश्यकता‍ऄनुुार ऄजधकतम‍ 1 ूक्े ट. √ जजला‍पजु लु‍ अाश्यकता‍ऄनुुार कायालव य‍एा‍ं ऄजधकतम‍ 1 ूक्े ट. √ बटाजलयन पजु लु‍प्रजिक्षण अाश्यकता‍ऄनुुार ऄजधकतम‍ 5 ूक्े ट. √ ुस्ट्ं थान‍‍/ कॉलजे ‍ पजु लु‍ अाश्यकता‍ऄनुुार ऄजधकतम‍ 5 ूक्े ट. √ फायररग रेंज‍‍ पजु लु‍ क,म्प अाश्यकता‍ऄनुुार ऄजधकतम‍ 5 ूक्े ट. √ ऄजग्निमन‍प्रजिक्षण अाश्यकता‍ऄनुुार ऄजधकतम‍ 5 ूक्े ट. √ ुस्ट्ं थान‍‍ अपदा‍प्रबधं न केंद्र‍ अाश्यकता‍ऄनुुार ऄजधकतम‍ 5 ूक्े ट. √ पीएडं टी‍ुजु ाधा‍ 2 @ 20 लाख‍ न्यूनतम 2500 ागव‍मीटर (टाइप-II) पीएडं टी‍ुजु ाधा‍ अाश्यकता‍ऄनुुार √ (टाइप-III) कजब्रस्ट्तान‍ 1 @ 10 लाख न्यूनतम 1 ूक्े ट. √ जुमटे री 1 @ 10 लाख न्यूनतम 1 ूक्े ट. √ पिओंु ‍के‍जलए 1@ 10 लाख न्यूनतम 2000 ागव‍मीटर √ कजब्रस्ट्तान[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 165 प्रजत‍यजू नट प्रदान‍दकया‍जाएगा स्ट्तर ुजु ाधाए ं प्लॉटों‍की‍ुख्ं या ‍क्षत्रे फल एलओपी जडे डीपी जुटी पाकव‍ 2@10 लाख न्यूनतम 40 ूक्े ट. √ जुटी बुएद्दिे ीय‍ 1@10 लाख न्यूनतम 8.0 ूक्े ट. √ मद, ान‍ बु‍जडपज अाश्यकता‍ऄनुुार √ ईंधन‍स्ट्टेिन अाश्यकता‍ऄनुुार √ अइएुबीटी अाश्यकता‍ऄनुुार न्यूनतम 10 ूक्े ट. √ Wholesale 1@ 10 लाख न्यूनतम 8.0 ूक्े ट. √ * लडैं ‍पलू लग‍एररया‍म‍ें200 ूक्े ट.‍तक‍अरजक्षत‍रखा‍जाए,‍जूा‍ंतक‍ुभं ा‍ूज ईपयजजगताए ं जल‍अपर्नू त‍और‍ुज, नटाआजुे न‍ प्रजत‍यजू नट स्ट्तर ुजु ाधाए ं प्लॉटों‍की‍ुख्ं या एलओपी जडे डीपी ‍क्षत्रे फल ुीाजे ‍िजधन‍ुयं त्रं (एुटीपी) एुटीपी (एुपीएु‍ अाश्यकता‍ऄनुुार एा‍ंइपीएु‍के‍ुाथ ) - 5 एमजीडी‍तक‍ 650 ागव‍मीटर /एमएलडी (22.7 एमएलडी) क्षमता एुटीपी (एुपीएु‍ अाश्यकता‍ऄनुुार एा‍ंइपीएु‍के‍ुाथ ) - 5 एमजीडी‍ु‍े 1,100 ागव‍मीटर /एमएलडी √ √ ऄजधक‍क्षमता‍(22.7 एमएलडी) ुीाजे ‍पलम्पग‍स्ट्टेिन अाश्यकता‍ऄनुुार 50 ागव‍मीटर (एुपीएु) एनए जनस्ट्ुारण‍पलम्पग‍ अाश्यकता‍ऄनुुार 50 ागव‍मीटर स्ट्टेिन (इपीएु) जल‍िजधन‍ुयं त्रं ‍ (डब्ल्यटू ीपी) डब्ल्यटू ीपी - 80 अाश्यकता‍ऄनुुार एमजीडी‍(363 300 ागव‍मीटर /एमएलडी √ √ एमएलडी) डब्ल्यटू ीपी - 40 अाश्यकता‍ऄनुुार एमजीडी‍(182 400 ागव‍मीटर /एमएलडी √ √ एमएलडी) बुू टर‍पलम्पग‍स्ट्टेिन‍के‍ुाथ‍भजू मगत‍जलािय 5 एमएल‍ क्षमता‍ अाश्यकता‍ऄनुुार 700 ागव‍मीटर /एमएल‍ √ 50 एमएल‍ क्षमता‍ अाश्यकता‍ऄनुुार 600 ागव‍मीटर /एमएल‍ √166 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] प्रजत‍यजू नट प्रदान‍दकया‍जाएगा स्ट्तर ुजु ाधाए ं प्लॉटों‍की‍ुख्ं या ‍क्षत्रे फल एलओपी जडे डीपी ठजु‍ऄपजिष्ट‍प्रबधं न‍ ऄपजिष्ट‍कज‍ऄलग‍ करन‍ेके‍जलए‍क्षत्रे ‍ स्ट्थानीय‍स्ट्तर‍ और‍ईपयजजगता‍ 1 @ 10,000 200 ागव‍मीटर √ ााूनों‍की‍पार्ककग‍ (पूल:े डलाा) ुामग्री‍ररक्वरी‍ ुजु ाधा ईप-िूर‍स्ट्तर 1 @ 5 लाख 6,000 - 8,000 ागव‍मीटर √ (ुमे ी-ऑटजमरे टक): 200 टीपीडी ुामग्री‍ररक्वरी‍ ुजु ाधा िूर‍स्ट्तर 1@ > 20 लाख 10,000 - 20,000 ागव‍मीटर √ √ (ऑटजमरे टक) : > 10,000 टीपीडी‍ Power आलजे क्रक‍ुब-ुटेिन‍ स्ट्थानीय‍स्ट्तर 1 @ 10,000 40 ागव‍मीटर √ 11 केाी‍ आलजे क्रक‍ुब-ुटेिन‍ ुामुदाजयक‍ स्ट्तर 2 @ 1 लाख 2,500-4,000 ागव‍मीटर √ 66 केाी‍ आलजे क्रक‍ुब-ुटेिन‍ ईप-िूर‍स्ट्तर 1 @ 5 लाख 7,000-10,000 ागव‍मीटर √ 220 केाी‍ आलजे क्रक‍ुब-ुटेिन‍ िूर‍स्ट्तर‍ 1 @ 20 4.0 ूक्े ट. √ √ 400 केाी‍ 22.7 जनर्ददष्‍ट‍ईपयजग‍जजन‍एां‍ईपयजग‍पररुर 22.7.1 प्रत्येक‍ईपयजग‍जजन‍म‍ें कइ‍ईपयजग‍पररुर‍िाजमल‍ूजते‍ू‍ैं जज‍ऄपन‍े अप‍में‍जाजिष्ट‍ूजत‍े ू।ैं ‍ईपयजग‍पररुर‍म‍ें ुंगत‍गजतजाजधयां‍िाजमल‍ूजती‍ू‍ैं और‍आन्ू‍ें स्ट्टैंडऄलजन‍भूखडं ों‍(प्रत्येक‍ईपयजग‍पररुर‍के‍जलए‍जनधावररत)‍के‍ रूप‍में‍ऄथाा‍एकीकृत/्ापक‍यजजनाओं‍(ज,ुे‍जडजस्ट्रक‍ुेंटर, कम्‍यजु नटी‍ुेंटर‍अदद)‍के‍रूप‍में‍जाकजुत‍दकया‍ जा‍ुकता‍ू।, i. प्रत्येक‍ईपयजग‍पररुरों‍कज‍जाजिष्ट‍ईपयजग/ईपयजग‍गजतजाजधयों‍कज‍करन‍े ऄनुमजत‍ूजगी। ii. लेअईट‍प्लान‍में‍जनर्ददष्ट‍ऄनुुार‍प्रत्येक‍ईपयजग‍पररुर‍की‍ऄाजस्ट्थजत‍और‍ुीमाएं‍ऄनरूु प‍ूोंगी। iii. ईपयजग‍पररुरों‍की‍ऄाजस्ट्थजत, ुीमाओं‍और‍प्रमुख‍ईपयजग‍में‍दकुी‍भी‍पररातवन, जजु‍भी‍कारणों‍ु‍े ूज‍और‍जाजधात‍ऄनुमजददत‍ूजने, कज‍लअे ईट‍यजजना‍म‍ेंिाजमल‍दकया‍जाएगा। 22.8 अााुीय‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 167 क. ईपयजग‍पररुर‍एा‍ंपररभाीाए ाँ ताजलका‍22.3:‍ईपयजग‍पररुर‍और‍पररभाीाए‍ंअााुीय: क्र.ु.ं ईपयजग‍पररुर‍ पररभाीा‍ 1 ग्रुप‍ूाईलुग कजइ‍ पररुर‍ जजुका‍ क्षेत्रफल‍ 3000 ागवमीटर‍ (झुग्गी/जेजे‍ पुनाावु‍ क्षेत्र/जािेी‍ क्षेत्र/ग्राम‍(लाल‍डजरा/दफरनी)/जास्ट्ताररत‍लाल‍डजरा‍के‍जलए‍200 ागवमीटर)‍ुे‍कम‍ नूीं‍ू,, जजुमें‍बुजनयादी‍ुुजाधाओं‍ज,ुे‍पार्ककग, पाकव, ुुजाधा‍की‍दकु ानें, ुाावजजनक‍ ईपयजजगता‍अदद, के‍ुाथ‍अााुीय‍फ्ल,ट‍िाजमल‍ू।ैं 2 प्लॉटेड‍ूाईलुग* एक‍या‍एक‍ु‍े ऄजधक‍अााु‍आकाइ(यों)‍के‍जलए‍पररुर, जजुमें‍एक‍या‍एक‍ु‍े ऄजधक‍मख्ु य‍भान‍ब्लॉक‍और‍ग,राज‍तथा‍ुेाा‍पुवनल‍के‍जलए‍ऄन्य‍ुूायक‍ब्लॉक‍ ूज‍ुकते‍ू।ैं 3 स्ट्टूजडयज‍ऄपाटवमेंट‍ कारपेट‍एररया** 40-60 ागवमीटर‍प्रजत‍आकाइ‍के‍ुाथ‍अााुीय‍फ्ल,ट्‍ु‍ूते ‍ु पररुर। 4 धमविाला‍ या‍ आुके‍ लघ‍ु ऄाजध‍के‍जलए‍ऄस्ट्थायी‍अााु‍प्रदान‍करन‍े ााल‍ेपररुर। ऄनुरूप‍ 5 राज्य‍ भान‍ /‍ राज्य‍ राज्य‍ुरकार‍और‍केंद्र‍ुरकार‍के‍मेूमानों‍ूते ‍ु रांजज़ट‍अााु‍प्रदान‍करने‍ााल‍े ऄजतजथ‍गृू‍ ुरकारी‍स्ट्ााजमत्ा‍के‍पररुर। 6 ऄफजडेबल‍ ुाावजजनक‍ अााुीय‍फ्ल,ट‍के‍ुाथ‍ऄस्ट्थायी‍अााु‍ुुजाधाओं‍ााल‍े पररुर, और‍भजजन‍की‍ दकराये‍के‍मकान‍ ुुजाधाओं‍ऄथाा‍आुके‍जबना‍ुामान्य‍ुुजाधाओं‍के‍ुाथ‍ियनगृू‍ााल‍ेपररुर। 7 स्ट्लम‍पुनाावु‍यजजना‍ झुग्गी‍क्षेत्र‍पुनबवुााट/पुनाावु‍के‍जूस्ट्ु‍े के‍रूप‍म‍ें लाभार्नथयों‍ूते ‍ु प्रदान‍दकए‍गए‍ अााुीय‍फ्ल,टों‍का‍पररुर। 8 ूजस्ट्टल‍ कजइ‍पररुर‍जजुमें‍कमरों‍के‍रूप‍म‍ेंअााुीय‍अााु‍प्रदान‍दकया‍जाता‍ू।, 9 र,न‍बुेरा‍(नाआट‍िल्े टर)‍ जबना‍दकुी‍िुल्क‍या‍टजकन‍िुल्क‍के‍्जि यों‍कज‍राजत्र‍अााु‍प्रदान‍करने‍की‍ ुुजाधा‍ााले‍पररुर।‍यू‍स्ट्थानीय‍ुरकार‍या‍स्ट्ा,जच्छक‍एजजें ुयों‍द्वारा‍ुंचाजलत‍ूज‍ ुकते‍ू।ैं *** 10 गेस्ट्ट‍ूाईु,‍ लॉलजग‍और‍ लघ‍ु ऄाजध‍के‍जलए‍ऄस्ट्थायी‍अााु‍प्रदान‍करन‍े ााल‍ेपररुर। बजर्मडग‍ूाईु‍ 11 कम‍ घनत्ा‍ ााल‍े िूरी‍जास्ट्तार‍में‍मौजूदा‍फाम‍वूाईु‍जजन्ू‍ें नीजत‍के‍ऄनुुार‍और‍नए‍कम‍घनत्ा‍ााल‍े अााुीय‍भूखंड‍ अााुीय‍भूखंडों‍के‍रूप‍में‍जनयजमत‍दकया‍गया‍ूज, ूररत‍जाकाु‍क्षेत्र‍के‍रूप‍म‍ें ऄनुमजत‍दी‍जा‍ुकती‍ू।, 12 जादेिी‍जमिन‍ जादेिी‍जमिन‍के‍जलए‍पररुर।‍ नजटः 1. *ाीव‍1962‍के‍पूाव‍भूखडं ‍के‍तौर‍पर‍जनधावररत‍दकए‍गए‍दज-मंजजला‍फ्ल,ट्‍ु‍कज‍अााुीय‍भूखंड‍माना‍जाएगा। 2. *अााुीय‍भूखंड/फ्ल,ट‍में‍जबस्ट्तर‍और‍नाश्ता‍अााु‍प्रदान‍करना‍एक‍ऄनुमेय‍गजतजाजध‍ूज‍ुकती‍ू,, यदद‍यू‍ ुमय-ुमय‍पर‍पयवटन‍मंत्रालय, भारत‍ुरकार‍/‍जीएनुीटीडी‍द्वारा‍ऄजधुूजचत‍यजजना‍के‍तूत‍पंजीकृत‍ू।, 3. **रेरा‍(अरइअरए)‍के‍ऄनुुार‍कारपेट‍एररया‍की‍पररभाीा । 4. ***ज,ुा‍दक‍भूजम‍की‍एक‍ुीमा‍ू,, आुजलए‍अााुीय‍और‍पीएुपी‍भूखंडों‍म‍ें बुएईद्देिीय‍ुुजाधाओं‍के‍जनमावण‍ूते ‍ु भूजम‍का‍आष्टतम‍तथा‍बेूतर‍ईपयजग‍करन‍े का‍प्रयाु‍दकया‍जाना‍चाजूए।‍रेलाे, स्ट्ाास्ट््य, ईद्यजग, डीटीुी, पुजलु‍ ज,ुी‍ुंबंजधत‍एजेंजुयों‍द्वारा‍रेला‍े टर्नमनलों, बु‍टर्नमनलों, थजक/खुदरा‍बाजारों, फ्रेट‍कॉम्प्लेक्ु, पुजलु‍स्ट्टेिनों‍ अदद‍के‍ऄंदर‍मौजूदा‍भानों‍में‍और‍नए‍प्रस्ट्ताजात‍जनमावणों‍अदद‍में, जूााँ‍भी‍स्ट्थान‍ईपलब्ध‍ूज, र,न‍बुेरों‍का‍168 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] जनमावण‍दकया‍जाना‍चाजूए, तथा‍आन‍र,न‍बुेरों‍में‍ईपयि ु ￿‍ुंिजधनों‍के‍ुाथ-ुाथ‍नाीन‍ऄाधारणाओं‍कज‍ ऄपनाकर, ज,ुे‍दक‍भूतल‍पर‍्ााुाजयक‍स्ट्थानों‍के‍ुाथ‍एकीकृत‍पररुर‍ूज‍ुकते‍ू‍ैं और‍प्रथम‍मंजजल‍पर‍र,न‍ बुेरा। ख. ऄनमु ये ‍गजतजाजधया ं ताजलका‍22.4:‍ईपयजग‍पररुर‍एा‍ंऄनमु ये ‍गजतजाजधया:ं‍अााुीय क्र.ु.ं ईपयजग‍जजन अााुीय‍क्षत्रे ‍(अरडी)‍ ईपयजग‍पररुर 1 2 3 4 5 6 ग्रपु ‍ूाईलुग प्लॉटेड‍ स्ट्टूजडयज‍ धमिव ाला‍या‍आुके‍ राज्य‍भान‍/‍ ऄफजडबे ल‍ ऄनमु ये ‍ ूाईलुग ऄपाटमव टें ‍ ुमान‍ राज्य‍ऄजतजथ‍ रेंटल‍ूाईलुग गजतजाजधया ं गूृ ‍ 1 अााु‍(प्लॉटेड)‍  2 अााुीय‍(फ्ल,ट)    3 खुदरा‍ दकु ान,ें     (20‍ ागव‍ मीटर‍ तक‍ के‍ क्षत्रे ‍ के‍ ुाथ‍भूतल‍पर)‍ 4 जमजश्रत‍ ईपयजग‍   गजतजाजध‍ 5 ुजुायटी‍       कायावलय‍ /‍ पंजीकृत‍ अरडब्ल्यूए‍‍ कायावलय‍ 6 ुामुदाजयक‍कक्ष‍/‍    बस्ट्ती‍जाकाु‍केंद्र‍ 7 क्रेच‍ /‍ डे‍ केयर‍     ुेंटर‍/‍अगं नााड़ी‍ 8 ाररष्ठ‍ नागररक‍    मनजरंजन‍कक्ष‍ 9 मनजरंजन‍क्लब‍/‍    ूॉल‍ 10 जस्ट्ालमग‍पलू ‍   11 धार्नमक    12 ियनागार‍  13 ऄजतजथ‍कक्ष‍  14 भजजन‍ क्षत्रे ‍    [भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 169 (जािेी‍ क्षेत्रों‍ कज‍ छजड़कर)‍ 15 ाॉच‍ और‍ ााड‍व      जनााु‍ (20‍ ागवमीटर)‍ 16 कॉन्फ्रेंु‍ूॉल‍और‍  ुंबंजधत‍ुुजाधाएं‍ 17 ुरकारी‍कायावलय  18 ुजजाजनयर‍िॉप  19 रेस्ट्टजरेंट‍  20 एटीएम‍    21 स्ट्टाफ‍ अााुीय‍  अााु‍ 22 ग,राज‍  23 ईजचत‍ मूल्य‍ की‍  दकु ान‍ ग. जाकाु‍जनयत्रं ण‍मानदडं ‍ ताजलका‍22.5:‍ग्रपु ‍ूाईलुग ईपयजग‍पररुर‍ न्यनू तम‍ ऄजधकतम‍ एफएअर न्यनू तम‍ उाँचाइ प्लॉट‍क्षत्रे ‍ मागाजव धकार ग्राईंड‍कारेज (मी.)‍ (मी.)‍ ग्रुप‍ूाईलुग‍ 3000 ागव‍ 33.33% 200 18‍ एनअर मी. (एएअइ‍/‍ऄजग्निमन‍ (मौजूदा‍डीयू‍में‍िेी‍बचे एफएअर‍ जाभाग‍तथा‍ऄन्य‍ कज‍ प्राप्त‍ करन‍े के‍ जलए‍ ुांजाजधक‍जनकायों‍ुे‍ परराधवन/पररातवन‍ के‍ मामल‍े में, ऄनापजि‍की‍ित‍व पर) ग्राईंड‍ कारेज‍ कज‍ 40%‍ तक‍ ऄनुमजत‍दी‍जाएगी।) ऄन्य‍जनयत्रं ण i. घनत्ा‍की‍उपरी‍ुीमा‍कज‍लचीली‍अााु‍आकाइ‍अकारों‍के‍ुाथ‍200 डीयू/ूक्े टेयर‍(900 पीपीएच)‍के‍रूप‍म‍ें जलया‍ जाएगा, तादक‍भूजम‍का‍आष्टतम‍ईपयजग‍ूज‍ुके।‍केंद्र‍ुरकार‍दद.जा.प्रा.‍के‍परामिव‍ुे‍ुाावजजनक‍अााु‍और‍राष्ट्रीय‍ मूत्ा‍की‍पररयजजनाओं‍के‍जलए‍घनत्ा‍और‍ऄन्य‍मानदडं ों‍कज‍जिजथल‍कर‍ुकती‍ू।, ii. जािेी‍क्षेत्र/गााँा‍(लाल‍डजरा‍/‍दफरनी)‍/‍जास्ट्ताररत‍लाल‍डजरा/ऄनजधकृत‍कॉलजजनयां‍म‍ें ुमूू ‍अााु‍भूखंड, न्यूनतम‍ 7.5 मागावजधकार‍ुड़कों‍के‍ुाथ‍2000 ागवमीटर‍की‍ूोंगी।‍ये‍भूखंड‍के‍ऄंदर‍पार्ककग‍अाश्यकताओं‍की‍पूर्नत‍और‍170 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] र,दफक‍पुजलु‍जाभाग‍और‍जीएनुीटीडी‍की‍ददल्ली‍ऄजग्निमन‍ुेाा‍(डीएफएु)‍ुे‍ऄनापजि‍प्रमाणपत्र‍की‍प्राजप्त‍की‍ ितों‍के‍ऄधीन‍ूोंगी।‍आु‍तरू‍के‍भूखंडों‍कज‍आन‍क्षेत्रों‍के‍जाकाु‍/‍लेअईट‍यजजनाओं‍में‍ुमूू‍अााु‍भूखंडों‍के‍रूप‍ में‍आन्ू‍ेंिाजमल‍करत‍े ुएए‍बाद‍में‍त,यार‍दकया‍जाएगा, यदद‍ऐुी‍यजजनाएं‍पूल‍े ुे‍ूी‍ऄनुमजददत‍नूीं‍ू।ैं iii. 400‍ागवमीटर‍कज‍ऄथाा‍ऄनमु ेय‍एफएअर‍के‍6% की‍दर‍ु‍े ऄजतररि ‍फ्लजर‍क्षेत्र,‍जज‍भी‍कम‍ूज‍ऄनुमजत‍दी‍ जाएगी,‍कज‍ुामुदाजयक‍अाश्यकताओं‍ज,ुे‍ुामुदाजयक‍/‍मनजरंजन‍ूॉल,‍क्रेच‍/‍डे‍केयर, लाआब्रेरी, ााचनालय, ाररष्ठ‍ नागररक‍मनजरंजन‍कक्ष/क्लब‍और‍ुजुाआटी‍कायावलय‍कज‍पूरा‍करने‍के‍जलए‍एफएअर‍ु‍े मुि ‍करते‍ुएए‍ऄनुमजत‍दी‍ जाएगी। iv. कम-ईंचाइ‍ईच्च‍घनत्ा‍ााले‍अााु‍कज‍प्राप्त‍करन‍े के‍जलए‍40%‍तक‍के‍ग्राईंड‍कारेज‍की‍ऄनुमजत‍दी‍जाएगी। v. जाकाुकताव‍यू‍ुुजनजित‍करेगा‍दक‍प्रस्ट्ताजात‍एफएअर‍(200 ुे‍ऄजधक‍ऄनुमेय‍एफएअर‍और‍200 डीयूएु/ू.े ‍का‍ घनत्ा)‍का‍न्यनू तम‍15%‍ुमुदाय-ुेाा‍कार्नमकों‍/‍इडब्ल्यूएु‍और‍जनम्न‍श्रेणी‍के‍जलए‍जनर्नमत‍दकया‍गया‍ू।, ‍आु‍तरू‍ के‍फ्ल,टों‍में‍न्यूनतम‍32 ागवमीटर‍का‍कारपेट‍क्षेत्र‍ूजगा।‍आन‍इडब्ल्यूएु‍डीय‍ूके‍जलए‍जनम्नजलजखत‍ितें‍लाग‍ूूोंगीः क. इडब्ल्यूएु‍ूाईलुग‍स्ट्टॉक‍का‍50%‍जाकाुकताव‍ुंस्ट्था‍(डीइ)‍द्वारा‍ऄनुरजक्षत‍रखा‍जाएगा‍और‍ऄपाटवमेंट‍ माजलकों, तथा‍केाल‍ुमूू‍अााु‍के‍जनााजुयों/माजलकों‍के‍जलए‍काम‍कर‍रू‍े ुामुदाजयक‍ुेाा‍कार्नमकों‍ (ुीएुपी)‍कज‍बाजार‍दरों‍पर‍ददया‍जाएगा।‍आन्ू‍ें ुंबंजधत‍ुमूू‍अााु‍स्ट्थलों/पररुरों‍ऄथाा‍आुुे‍ुटे‍स्ट्थान‍ पर‍डीइ‍द्वारा‍जाकजुत‍दकया‍जाएगा। ख. इडब्ल्यूएु‍अााु‍ईद्देश्य‍के‍जलए‍डीइ‍द्वारा‍जाकजुत‍अााु‍आकाआयों‍के‍िेी‍बचे‍50%‍कज‍स्ट्थानीय‍जनकायों‍ द्वारा‍दद.जा.प्रा.‍की‍नीजत‍के‍ऄनुुार‍जचजन्ूत‍दकए‍गए‍पात्र‍लाभार्नथयों‍कज‍बेचे‍जाएगं े।‍आन्ू‍ें डीइ‍द्वारा‍ ुमीपाती‍दकुी‍ा,कजल्पक‍स्ट्थल‍पर‍जाकजुत‍दकया‍जा‍ुकता‍ू।, ग. आु‍ऄलग‍अााु‍पॉकेट‍के‍जलए‍डीइ‍द्वारा‍ुभी‍अाश्यक‍पार्ककग, ्ााुाजयक‍और‍पीएुपी‍ुुजाधाएं‍भी‍ प्रदान‍की‍जाएंगी। घ. ज,ुा‍दक‍ुरकार/दद.जा.प्रा.‍द्वारा‍आु‍ुंबंध‍में‍जनधावररत‍दकया‍गया‍ू,, डीइ‍द्वारा‍जनर्नमत‍इडब्ल्यूएु‍अााु‍ घटक‍गुणािा‍अिाुन‍जांच‍की‍ित‍व के‍ऄधीन‍ूजगा।‍आु‍घटक‍का‍ऄंजतम‍तौर‍पर‍ुौंपा‍जाना/ऄजधग्रूण‍ करना, गणु ािा‍अिाुन‍अाश्यकताओं‍कज‍पूरा‍करन‍े की‍ितव‍के‍ऄधीन‍ूजगा। ङ. दद.जा.प्रा./स्ट्थानीय‍जनकायों‍द्वारा‍दद.जा.प्रा.‍द्वारा‍जनधावररत‍दरों‍पर‍लाभाजन्ात‍पात्र‍लाभार्नथयों‍कज‍जनधावररत‍ भूजम‍और‍इडब्ल्यूएु‍अााु‍घटक‍कज‍बेचने/ूस्ट्तांतररत‍करने‍के‍बाद‍ूी‍ुंभाजात‍खरीदारों‍कज‍जनधावररत‍दर‍ पर‍ऄपन‍े जूस्ट्ुे/स्ट्ााजमत्ा‍के‍तूत‍जबक्री‍यजग्य‍घटक‍का‍ाास्ट्तजाक‍ूस्ट्तांतरण/लेनदेन‍करने‍की‍ऄनुमजत‍दी‍ जाएगी। vi. केन्द्र‍ुरकार, राज्य‍ुरकार‍और‍ऄन्य‍ुरकारी‍ऄजभकरणों‍के‍जनयजि ा‍अााु‍कज‍ुामुदाजयक‍ुेाा‍पुवनल‍/‍ इडब्ल्यूएु‍और‍जनम्न‍अय‍ाग‍व के‍जलए‍एफएअर‍ऄथाा‍अााु‍आकाआयों‍की‍अाश्यताओं‍का‍पालन‍करना‍ऄजनााय‍व नूीं‍ू।, ताजलका‍22.6:‍प्लॉटेड‍ूाईलुग[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 171 ईपयजग‍पररुर न्यनू तम‍प्लॉट‍क्षत्रे ऄजधकतम‍ एफएअ डीय‍ूकी‍ उाँचाइ (ाग‍वमी.) ग्राईंड‍कारेज र ऄजधकतम‍ु.ं (मी.)‍ (%) प्लॉटेड‍ 1 50‍तक 90* 350 3 15‍ मीटर‍ (जस्ट्टल्ट‍ के‍ ूाईलुग जबना) 2 50‍ुे‍उपर 100‍तक 90* 350 4 3 100‍ुे‍उपर 250‍ 75** 300** 4 17.5‍मीटर‍(जस्ट्टल्ट‍के‍ तक‍ ुाथ) 4 250‍ुे‍500‍के‍उपर‍ 75 225 6 तक ्जि गत‍ भूखंड‍ के‍ 5 500‍ुे‍उपर 750‍ 60 225 6 जलए‍ ऄजग्निमन‍ तक जाभाग‍ुे‍जनकाुी‍के‍ 6 750‍ुे‍उपर‍1000‍ 50 200 9 ऄधीन तक 7 1000‍ुे‍उपर‍1500‍ 50 200 9 तक 8 1500‍ुे‍उपर 2250‍ 50 200 12 तक 9 2250‍ुे‍उपर 3000‍ 50 200 15 तक 10 3000‍ुे‍उपर 3750‍ 50 200 18 तक 111 3750 ुे‍उपर‍ 50 200 21 ऄन्य‍जनयत्रं ण i. घनत्ा‍की‍गणनाओं‍के‍ईद्देश्य‍ुे अााु‍आकाइ‍में‍4.5‍्जि यों‍कज‍ुमायजजजत‍करन‍े और‍ुेाकों‍के‍जनााु‍म‍ें 2.25‍्जि यों‍कज‍ुमायजजजत‍करने‍पर‍जाचार‍दकया‍जाएगा। ii. ुंबंजधत‍स्ट्थानीय‍जनकाय जनम्नजलजखत‍के‍जलए‍ुक्षम‍ूजगा: क) ागव‍गज‍ु‍े ागवमीटर‍तक‍के‍क्षत्रे ‍के‍रूपांतरण‍ु‍े ईत्पन्न‍ूजन‍े ााले‍भूखंड‍के‍अकार‍म‍ें 2%‍तक‍के‍ऄतं र‍की‍ ऄनदेखी‍करने‍ूते ु । ख) *भूखंड‍ के‍ अकार‍ की‍ पूावाती‍ श्रेणी‍ के‍ जलए‍ लाग‍ू 100%‍ भूजम‍ अाृि‍ क्षेत्र‍ के‍ मानदंड,‍ जनमावण‍ के‍ जनयजमतीकरण‍के‍जलए‍ुक्षम‍ूोंगे, जज‍ददनांक:‍22.09.06‍कज‍ऄजधुूजचत‍िुल्कों‍के‍भुगतान‍पर‍पूले‍ुे‍ूी‍ जाद्यमान‍ू।ैं ग) **100‍ुे‍175‍ागवमीटर‍के‍बीच‍के‍अकार‍के‍भूखंड‍ुे‍ुम्बंजधत‍100%‍भूजम‍अाृि‍क्षेत्र‍और‍350‍ एफएअर‍ ददनांक:‍ 22.09.06‍ कज‍ ऄजधुूजचत‍ िल्ु कों‍ के‍ भुगतान‍ पर‍ पूल‍े ुे‍ जाद्यमान‍ जनमावण‍ के‍ जनयजमतीकरण‍के‍जलए‍ुक्षम‍ूोंगे। iii. अााुीय‍भूखंड‍का‍न्यनू तम‍अकार‍32‍ागव‍मीटर‍ूजगा। iv. अााु‍आकाआयों‍की‍ऄजतररि ‍ुंख्या‍नागररक‍ऄास्ट्थापना‍के‍ुंाद्धनव ‍के‍जलए‍लेाी‍के‍भुगतान‍के‍ऄधीन‍ूजगा। v. दकुी‍भी‍भूखंड‍में‍कुल‍भूजम‍अाृि‍क्षेत्र‍और‍ऄनुमेय‍एफएअर‍ऄगली‍पूावाती‍श्रेणी‍म‍ें ुबुे‍बड़े‍भूखंड‍के‍ ऄनुमेय‍एफएअर‍ुे‍कम‍ूजगा। vi. भान‍की‍ऄजधकतम‍उाँचाइ‍जबना‍जस्ट्टल्ट‍पार्ककग‍ााल‍े भूखंडों‍में‍15‍मी.‍और‍जस्ट्टल्ट‍पार्ककग‍ााले‍भूखंडों‍म‍ें 17.5‍ मी.‍ ूजगी।‍ ऐुे‍ अााुीय‍ भान‍ कज‍ गगनचुम्बी‍ भान‍ नूीं‍ माना‍ जाएगा।‍ ऄजग्न‍ और‍ जीान‍ ुुरक्षा‍ की‍ अाश्यकताओं‍के‍ईद्देश्य‍ु,े ऄजग्निमन‍जाभाग‍की‍स्ट्ाीकृजत‍्जि गत‍भान‍स्ट्ाामी‍द्वारा‍प्राप्त‍की‍जाएगी। vii. भूखंडों‍के‍ईपजाभाजन‍की‍ऄनुमजत‍नूीं‍दी‍जाती।‍ूालााँदक, ऄगर‍एक‍अााुीय‍भूखंड‍में‍एक‍ुे‍ऄजधक‍भान‍ू,,172 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] तज‍ऐुे‍ुभी‍भानों‍के‍जनर्नमत‍क्षेत्र‍और‍भूजम‍अाृि‍क्षेत्र‍का‍यजग, ईु‍भूखंड‍में‍ऄनुमेय‍जनर्नमत‍क्षेत्र‍और‍भूजम‍ अाृि‍क्षेत्र‍ुे‍ऄजधक‍नूीं‍ूजगा। viii. दज‍भूखंडों‍जजनका‍ऄजधकतम‍यजग‍64‍ागवमीटर‍ूजगा,‍के‍एकीकरण‍की‍ऄनुमजत‍जनम्नजलजखत‍ितों‍के‍ुाथ‍दी‍ जाएगी: क) स्ट्थानीय‍जनकाय‍लअे ईट‍यजजना‍कज‍एक‍ुाथ‍ुंिजजधत‍करेगा। ख) ऄजधकतम‍भूजम‍अाृि‍क्षेत्र, ुेटब,क, पार्ककग, अााु‍आकाइयााँ‍अदद‍एकीकृत‍भूखंड‍के‍अकार‍के‍जलए‍ूोंगे। ग) दज‍्जि गत‍भूखंडों‍के‍मामल‍ेमें‍ऄनुमेय‍ऄजधकतम‍एफएअर‍ऄनुमेय‍एफएअर‍ुे‍कम‍नूीं‍ूजगा। ix. यदद‍मेजेनाआन‍फ्लजर‍का‍जनमावण‍दकया‍जाता‍ू,, तज‍आुकी‍जगनती‍एफएअर‍म‍ेंकी‍जाएगी। x. 100‍ागवमीटर‍ु‍े 750‍ागवमीटर‍तक‍के‍क्षेत्रफल‍ााल‍े भूखंडों‍के‍जलए‍जस्ट्टल्ट‍का‍प्रााधान‍ऄजनाायव‍ूजगा।‍750‍ ागवमीटर‍ु‍े ऄजधक‍के‍भूखंडों‍के‍जलए,‍एमपीडी‍के‍मानदंडों‍के‍ऄनुुार,‍पार्ककग/‍इुीएु‍प्राप्त‍करन‍े के‍जलए‍ ुेटब,क /‍जस्ट्टल्ट‍में‍पार्ककग‍प्रदान‍की‍जाएगी।‍यदद‍भान‍का‍जनमावण‍अााु‍के‍जलए‍ऄनुपयि ु ‍उाँचाइ‍(2.4 मी. ु‍े कम)‍के‍जस्ट्टल्ट‍क्षेत्र‍के‍ुाथ‍दकया‍जाता‍ू‍, जजुका‍ईपयजग‍पार्ककग‍के‍जलए‍दकया‍जाएगा‍तज‍ऐुे‍जस्ट्टल्ट‍क्षेत्र‍कज‍ एफएअर‍में‍ुजम्मजलत‍नूीं‍दकया‍जाएगा, परन्तु‍भान‍की‍उाँचाइ‍के‍जलए‍आुकी‍गणना‍की‍जाएगी। xi. स्ट्ाीकृत‍लअे ईट‍यजजना‍के‍ऄनुुार,‍ुाेंट‍क्वाटवर‍की‍ुंख्या‍ईपलब्ध‍करायी‍जाएगी‍और‍जनधावररत‍उाँचाइ‍के‍ ऄन्दर‍आनका‍जनमावण‍दकया‍जाएगा।‍ूालांदक, यदद‍गर, ाज‍ब्लॉक‍का‍जालय‍मुख्य‍भान‍के‍ुाथ‍कर‍ददया‍जाता‍ू,, तज‍मुख्य‍भान‍के‍एक‍भाग‍के‍रूप‍में‍ऄलग‍ुे‍दकुी‍ुाेंट‍क्वाटवर‍ब्लॉक‍या‍ुाेंट‍क्वाटवर‍की‍ऄनुमजत‍नूीं‍दी‍ जाएगी।‍ूालांदक, ऄनुमेय‍भूजम‍अाृि‍क्षेत्र‍के‍एफएअर‍के‍ऄतं गवत‍अााु‍आकाइ‍के‍एक‍भाग‍के‍रूप‍म‍ें ुाेंट‍रूप‍ के‍प्रााधान‍की‍ऄनुमजत‍दी‍जाएगी। xii. जनधावररत‍उाँचाइ‍प्रजतबन्ध‍के‍ुाथ‍ऄनुमेय‍एफएअर‍के‍ऄंतगवत,‍अााुीय‍आकाइ‍के‍एक‍भाग‍के‍रूप‍में‍ुाेंट‍रूम‍ का‍प्रााधान‍(खाना‍पकान‍े का‍स्ट्थान,‍बरामदा, स्नानागार‍और‍िौचालय‍की‍जािेीताओं‍के‍ुाथ,‍11‍ागवमीटर‍ु‍े ऄजधक‍के‍फिव‍क्षेत्र)‍की‍ऄनुमजत‍दी‍जाएगी।‍ुाेंट‍क्वाटवर‍का‍ऄजधकतम‍अकार‍25‍ागवमीटर‍ूजगा।‍यदद‍यू‍ अकार‍म‍ेंबड़ा‍ू,, तज‍ुाेंट‍क्वाटवर‍की‍गणना‍पणू व‍अााु‍आकाइ‍के‍रूप‍में‍घनत्ा‍में‍की‍जाएगी। xiii. मानक‍यजजनाएं:‍प्राजधकरण‍द्वारा‍ऄजभकजल्पत‍और‍ऄनुमजददत‍मानक‍भानों‍की‍कइ‍यजजनाएं‍ू।ैं ‍जब‍भी‍लाग‍ू ूज,‍ऐुी‍यजजनाओं‍का‍ुंचाजलत‍ूजना‍जारी‍रूगे ा।‍ऐुी‍यजजनाओं‍कज‍ईपयुि ‍जाकाु‍जनयंत्रणों‍के‍ऄनुुार‍ ुंिजजधत‍दकया‍जाएगा। xiv. ुाावजजनक‍भूजम‍पर‍ऄजतक्रमण‍कज‍जनयजमत‍नूीं‍दकया‍जाएगा‍और‍जनम्नजलजखत‍कज‍छजड़कर‍ऄजतररि ‍जनमाणव ‍ या‍उाँचाइ‍के‍जनयजमतीकरण‍के‍जलए‍स्ट्थानीय‍जनकाय‍द्वारा‍स्ट्ाीकृजत‍प्रदान‍करन‍े ुे‍पूाव‍आन्ूें‍ूटा‍ददया‍जाएगा: क) प्रक्षेपों‍(बाूर‍जनकल‍े ुएए‍भाग) /‍छज्ज े /‍ढके‍ुएए‍छज्ज‍े के‍जनर्नमत‍भाग‍जज‍भूजम‍तल‍ुे‍3 मी.‍की‍उाँचाइ‍ुे‍1 मी.‍ऄजधक‍तक,‍ददनांक:‍07.02.2007‍ु‍े पूा‍व जाद्यमान‍था,‍कज‍ऄजनयजजजत‍क्षेत्रों‍(जािेी‍क्षेत्र, ग्राम‍की‍ जनुाँख्या‍और‍ऄनाजधकृत‍जनयजमत‍कालजजनयों‍ुजूत)‍और‍पुनाावु‍कॉलजजनयों‍में‍1962‍ुे‍पूाव‍के‍ कॉलजजनयों‍(ए‍एां‍बी‍श्रेणी‍कज‍छजड़कर)‍के‍24‍मी.‍मागावजधकार‍ुे‍कम‍की‍ुड़कों‍पर‍175‍ागवमीटर‍तक‍ के‍ अकार‍ ााले‍ भूखंडों‍ कज‍ जनयजमत‍ दकया‍ जाएगा।‍ भू-स्ट्ााजमयों‍ /‍ कब्जाधारकों‍ कज‍एक‍ न्यायुंगत‍ ुमयााजध‍के‍ऄन्दर‍ुरं चनात्मक‍ुुरक्षा‍प्रमाणपत्र‍और‍ऄजग्न‍जनकाुी‍प्राप्त‍करनी‍ूजगी,‍ज,ुा‍दक‍ुरकार‍ द्वारा‍ऄजधुूजचत‍दकया‍गया‍ू।, ‍ऐुे‍प्रक्षेपों‍/‍जनर्नमत‍भागों‍कज‍एफएअर‍में‍जगना‍जाएगा‍और‍ऄनुमये ‍ एफएअर‍के‍ऄजतररि ,‍एफएअर‍के‍मामले‍म ें ऐुे‍एफएअर‍कज‍ईजचत‍िल्ु क‍के‍भुगतान‍की‍ितव‍पर‍ जनयजमत‍दकया‍जाएगा,‍ज,ुा‍दक‍ुरकार‍द्वारा‍ऄनुमजददत‍दकया‍गया‍ू।, ख) ुंबंजधत‍ स्ट्थानीय‍ जनकाय‍ जनयजमत‍ दकये‍ जाने‍ ााले‍ ऐु‍े ुभी‍ प्रक्षेपों‍ का‍ एक‍ ुाेक्षण‍ करेगा‍ और‍ जनयजमतीकरण‍के‍जलए‍ुाेक्षण‍करेगा‍और‍कब्जाधारकों/‍भूस्ट्ााजमयों‍और‍ुूची‍में‍ऐुे‍ प्रक्षेपों‍के‍ुमााेिन‍ /‍बजूष्करण‍‍के‍जलए‍जनता‍के‍दकुी‍भी‍प्रजतजनजध‍ुे‍प्राप्त‍अपजियों‍के‍जलए‍पजब्लक‍डजमने ‍म‍ें ऐुी‍ुूची‍ ईपलब्ध‍करेगा‍और‍ईुके‍ईपरांत‍आु‍ुूची‍कज‍जलजखत‍म‍ें प्राप्त‍ऐु‍े अपजियों‍पर‍ुजच-जाचार‍के‍बाद‍एक‍ माू‍की‍ऄाजध‍के‍ऄन्दर‍ऄंजतम‍रूप‍ददया‍जाएगा। xv. ऄजतररि ‍एफएअर‍और‍/‍या‍उाँचाइ‍की‍स्ट्ाीकृजत‍या‍जनयजमतीकरण‍की‍मागं ‍करने‍ााला‍प्रत्येक‍अाेदक‍दकुी‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 173 ुंरचनात्मक‍ऄजभयंता‍ुे‍प्राप्त‍ुंरचनात्मक‍ुुरक्षा‍ुंबंधी‍प्रमाणपत्र‍प्रस्ट्तुत‍करेगा।‍जूा‍ं पर‍आु‍तरू‍का‍प्रमाण‍ पत्र‍प्रस्ट्तुत‍नूीं‍दकया‍जाता‍ू‍, या‍भान‍कज‍ऄन्यथा‍ुंरचनात्मक‍रूप‍ुे‍ऄुुरजक्षत‍पाया‍जाता‍ू,, तज‍ुंबंजधत‍ स्ट्थानीय‍जनकाय‍द्वारा‍एक‍न्यायुंगत‍जनधावररत‍ऄाजध‍के‍ऄन्दर‍ुंरचनात्मक‍त्रुरट‍कज‍ठीक‍करन‍े के‍जलए‍ भूस्ट्ाामी‍कज‍औपचाररक‍नजरटु‍ददया‍जाएगा,‍ऐुा‍करने‍में‍ऄुफल‍ूजने‍पर‍ुंबंजधत‍स्ट्थानीय‍जनकाय‍द्वारा‍ भान‍कज‍ऄुुरजक्षत‍घजजीत‍कर‍ददया‍जाएगा‍और‍भूस्ट्ाामी‍या‍स्ट्थानीय‍जनकाय‍द्वारा‍आुे‍्ास्ट्त‍कर‍ददया‍ जाएगा। xvi. न्यूनतम‍ुेटब,क्ु‍जनम्नांदकत‍ताजलका‍के‍ऄनुुार‍ूोंगे: ताजलका‍22.7: अााुीय‍क्षत्रे ‍के‍जलए‍न्यनू तम‍ुटे बक, ‍मानदडं -प्लॉटेड‍ूाईलुग क्र.ु.ं प्लॉट‍का‍अकार‍(ागवमीटर) न्यनू तम‍ुटे बक, ‍(मीटर‍म)ें ‍ ुामन‍े पीछे‍ ुाआड‍1 ुाआड‍2 1 100‍ुे‍नीच े 0 0 0 0 2 101‍ुे‍250‍तक‍ 3 0 0 0 3 251‍‍ुे‍500 तक 3 3 3 0 4 501‍ुे‍2000‍तक‍ 6 3 3 3 5 2001‍और‍10000‍तक 9 6 6 6 (cid:13) 10000 ुे‍उपर 15 9 9 9 क. यदद‍ऄनुमेय‍भूजम‍अाृि‍क्षेत्र‍दकुी‍भूखंड‍म‍ें ईपरजि ‍ुेटबक्, ु‍के‍ुाथ‍ऄर्नजत‍नूीं‍दकया‍जाता‍ू,, तज‍ पूावाती‍श्रेणी‍के‍ुेटब,क्ु‍की‍ऄनुमजत‍दी‍जा‍ुकती‍ू।, ख. 50‍ागवमीटर‍ु‍े 100‍ाग व मी.‍तक‍के‍क्षेत्रफल‍ााल‍े अााुीय‍भूखंडों‍में‍न्यूनतम‍2मी.‍X‍2मी.‍खलु ा‍अंगन /‍ुर्नाु‍डॉक्ट‍र‍प्रदान‍की‍जाएगी। ताजलका‍22.8: स्ट्टूजडयज‍ऄपाटमव टें ईपयजग‍पररुर‍ न्यनू तम‍ ऄजधकतम‍ एफएअर न्यनू तम‍ उाँचाइ प्लॉट‍क्षत्रे ‍ मागाजव धकार ग्राईंड‍कारेज (मी.)‍ (मी.)‍ स्ट्टूजडयज‍ 2000 ागव‍ 33.33% 200 12 एनअर ऄपाटवमेंट‍ मी. (एएअइ‍/‍ऄजग्निमन‍जाभाग‍और‍ ऄन्य‍ुांजाजधक‍जनकायों‍ुे‍जनकाुी‍ के‍ऄधीन) ऄन्य‍जनयत्रं ण i. फ्ल,ट‍का‍ऄजधकतम‍कारपेट‍क्षत्रे ‍60‍ाग‍व मीटर‍ूजगा। ii. 400‍ागवमीटर‍या‍ऄनुमेय‍एफएअर‍के‍6%‍के‍दर‍पर‍जज‍भी‍कम‍ूज,‍ऄजतररि ‍फि‍व क्षेत्र कज‍एफएअर‍ु‍े मुि ‍ूजन‍े की‍ ऄनुमजत‍दी‍जाएगी‍जज‍ुमुदाय‍की‍अाश्यकताओं‍कज‍परू ा‍कर‍ुके,‍ज,ुे‍दक‍ुमुदाय/‍मनजरंजन‍ूॉल, जििु‍गृू,‍ पुस्ट्तकालय, ााचनालय,‍ाररष्ठ‍नागररक‍मनजरंजन‍कक्ष/‍क्लब‍और‍ुजमजत‍कायावलय। ताजलका‍22.9: धमिव ाला174 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ईपयजग‍पररुर‍ न्यनू तम‍ ऄजधकतम‍ एफएअर न्यनू तम‍ उाँचाइ प्लॉट‍क्षत्रे ‍ ग्राईंड‍कारेज मागाजव धकार (मी.)‍ (मी.)‍ 500 धमविाला 30% 120 15 ागव‍मी. ताजलका‍22.10: राज्य‍भान/राज्य‍ऄजतजथ‍गूृ ईपयजग‍पररुर‍ न्यनू तम‍प्लॉट‍ ऄजधकतम‍ एफएअर न्यनू तम‍ उाँचाइ क्षत्रे ‍ ग्राईंड‍कारेज मागाजव धकार (मी.)‍ (मी.)‍ राज्य‍भान/राज्य‍ -- 50% 200 -- एनअर ऄजतजथ‍गृू (एएअइ‍/‍ऄजग्निमन‍जाभाग‍और‍ ऄन्य‍ुांजाजधक‍जनकायों‍ुे‍ जनकाुी‍के‍ऄधीन)‍ ऄन्य‍जनयत्रं ण i. ज़जन-डी‍के‍ुब-ज़जन‍डी‍-13‍के‍मामले‍म,ें ऄजधकतम‍उाँचाइ‍26‍मी.‍ुे‍ऄजधक‍नूीं‍ूजगी‍(ऄजग्न‍और‍ऄन्य‍ ा,धाजनक/‍ुंरक्षा‍जनकाुी‍जजुकी‍अाश्यकता‍ुमय-ुमय‍पर‍पड़‍ुकती‍ू), । ताजलका‍22.11: ऄफजडबे ल‍ुााजव जनक‍दकराए‍के‍मकान ईपयजग‍पररुर‍ न्यनू तम‍प्लॉट‍ ऄजधकतम‍ एफएअर न्यनू तम‍ उाँचाइ क्षत्रे ‍ मागाजव धकार ग्राईंड‍कारेज (मी.)‍ (मी.)‍ ऄफजडेबल‍ 2000 33.33% 200 12 एनअर‍ ुाावजजनक‍दकराए‍ ागव‍मी. (एएअइ‍/‍ऄजग्निमन‍जाभाग‍ के‍मकान‍ और‍ऄन्य‍ुांजाजधक‍जनकायों‍ुे‍ (एपीअरएच) जनकाुी‍के‍ऄधीन) ऄन्य‍जनयत्रं ण i. 400‍ागवमीटर‍के‍ऄजतररि ‍तल‍क्षत्रे फल‍या‍ऄनुमये ‍एफएअर‍के‍6%‍के‍दर‍पर,‍जज‍भी‍कम‍ूज,‍कज‍एफएअर‍ मुक्‍त‍कर‍ददया‍जाएगा,‍तादक‍ुामुदाय‍की‍अाश्यकताओं‍कज‍पूरा‍कर‍ुके‍ज,ुे‍दक‍ुामुदाजयक/‍मनजरंजनात्मक‍ ूॉल, क्रेच/‍डे‍केयर,‍भण्डारण‍ुुजाधाएाँ‍और‍ुजुायटी‍कायावलय। ii. ुरकारी‍जनकायों‍ुजूत,‍एपीअरएच का‍जनमावण, ुंचालन‍और‍रखरखाा‍दकुी‍भी‍ुंस्ट्था‍द्वारा दकया‍जा‍ुकता‍ ू‍, या‍दफर‍भारत‍ुरकार‍के‍एअरएचुी‍यजजना‍के‍मॉडल-1‍(मौजूदा‍ुरकारी‍जाि‍पजजीत‍ररि ‍घरों‍कज‍ ररयायत‍ऄनुबंध‍के‍मा्यम‍ु‍े ऄफजडेबल‍दकराय‍े के‍अााु‍में‍पररार्नतत‍करना)‍के‍ऄनुुार,‍आु‍े ुंचालन‍और‍ रखरखाा‍के‍जलए‍दकुी‍ररयायतकताव‍(जनजी‍ुंस्ट्थाओं)‍कज‍ुौंपा‍जा‍ुकता‍ू।ैं iii. ऄफजडेबल‍दकराए‍का‍अााु‍(एअरएच)‍पीपीपी‍अधार‍(मॉडल‍II) पर‍ूज‍ुकता‍ू‍,l क. आु‍मॉडल‍के‍मा्यम‍ु‍े जनर्नमत‍एअरएच‍ में‍ुभी‍ुामान्य‍ुुजाधाओं‍ुजूत,‍अााुीय‍आकाइ‍(प्रत्येक‍ एक/‍दज‍ियनकक्ष‍के‍जलए‍क्रमिः‍32/60‍ागवमीटर‍का‍कारपेट‍क्षेत्र)‍और‍4/6‍बडे ‍की‍डजरमेरी‍(10‍ ागवमीटर‍का‍कारपेट‍क्षेत्र‍तक,‍प्रजत‍जबस्ट्तर‍के‍जलए)‍का‍ुजम्मश्रण‍ुजम्मजलत‍ूजगा।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 175 ख. एअरएच‍के‍एकल‍पररयजजना‍में‍कम‍ुे‍कम‍40 डीयू‍(दज‍ियनकक्ष/‍एक‍ियनकक्ष)‍या‍ुमकक्ष‍ डॉर्नमटरी‍जबस्ट्तर‍ूोंग‍े (32‍ागमव ीटर‍क्षेत्र‍तक‍के‍1‍ियनकक्ष‍आकाइ‍कज‍3‍डॉरमेटरी‍जबस्ट्तरों‍के‍ुमकक्ष‍ माना‍जाता‍ू), । ग. जनजी‍/‍ुाावजजनक‍ुंस्ट्थाओं‍कज‍एक‍/‍दज‍ियनकक्ष‍और‍डॉर्नमटरीज‍(4/6‍आकाइयों)‍के‍दकुी‍भी‍तरू‍ का‍ुंयजजन‍करने‍के‍जलए‍ईदार‍ूजना‍ूजगा।‍ूालांदक, यू‍ुुजनजित‍करन‍े के‍जलए‍दक‍आु‍तरू‍के‍ पररुरों‍का‍ईपयजग‍िूरी‍प्रााुी‍/‍गरीब‍या‍इडब्ल्यूएु‍/‍एलअइजी‍श्रणे ी‍के‍जलए‍दकया‍जाता‍ू‍,और‍ दकुी‍ऄन्य‍ईद्देश्यों‍के‍जलए‍आुका‍दरुु पयजग‍नूीं‍दकया‍जाता‍ू,, लाआुेंु‍की‍ऄजधकतम‍ऄाजध‍का‍ प्रााधान‍दकया‍गया‍ू।, iv. पररुर‍में‍ऄनुमेय‍एफएअर‍के‍10%‍तक‍के‍्ााुाजयक‍घटक‍की‍ऄनुमजत‍दी‍जा‍ुकती‍ू‍, जजुे‍ुंस्ट्था‍द्वारा‍ दकराए‍पर‍ददया‍या‍बेचा‍जा‍ुकता‍ू।, . v. एअरएच के‍ुभी‍जनााुी‍अााुीय‍कॉम्प्लेक्ु‍के‍स्ट्ाामी‍द्वारा‍ईनकज‍प्रदान‍दकए‍गए‍लाआुेंु‍के‍ऄजधकारों‍ के‍अधार‍पर‍घरों‍पर‍कब्जा‍ल‍ेुकते‍ू।ैं vi. ऐुे‍लाआुेंुों‍का‍ऄजधकतम‍कायवकाल‍तीन‍ाीव‍ुे‍ऄजधक‍नूीं‍ूजगा। vii. लाआुेंु‍दस्ट्तााेज‍का‍नाीनीकरण‍ऄजधकतम‍कायवकाल‍ुे‍अगे‍नूीं‍बढ़ाया‍जाना‍चाजूए। viii. एक‍एअरएच कॉम्प्लेक्ु‍में,‍ूाईलुग‍कॉम्प्लेक्ु‍के‍स्ट्ाामी‍का‍यू‍दाजयत्ा‍ूजगा‍दक: (क) ाू‍दकुी‍भी‍जनााुी‍कज‍लाआुेंु‍प्रदान‍करने‍के‍जलए‍ईु‍पर‍कजइ‍प्रीजमयम‍नूीं‍लगाएगा। (ख) दकुी‍भी‍जनााुी‍कज‍ईुके‍लाआुेंु‍का‍पुनः‍जनष्पादन‍करके‍लाआुेंु‍के‍ऄजधकतम‍कायवकाल‍ुे‍ऄजधक‍ घर‍/‍कॉम्प्लेक्ु‍में‍रूने‍की‍ऄनुमजत‍प्रदान‍नूीं‍करेगा। ix. एअरएच‍के‍ुंबंध‍में‍रूपरेखाएाँ‍ऄफजडेबल‍दकराये‍के‍अााुीय‍कॉम्प्लेक्ुों‍के‍जलए‍जारी‍ुंचालनात्मक‍ ददिाजनदेिों‍के‍ऄनुुार‍ूोंगे,‍ज,ुा‍दक‍अााुन‍एां‍िूरी‍कायव‍मंत्रालय,‍भारत‍ुरकार‍द्वारा‍जारी‍और‍ दद.जा.प्रा.‍द्वारा‍ऄनुमजददत‍दकया‍गया‍ू‍,l x. ऐुे‍मामल‍े में‍जूा‍ं पर‍ददिाजनदेिों‍म‍ें प्रााधान‍स्ट्पष्ट‍नूीं‍ू,ैं दद.जा.प्रा.‍/‍प्राजधकरण‍के‍ऄनुमजदन‍के‍ऄधीन,‍ ऄलग‍जाकाु‍जनयंत्रण‍मानदंड‍जनधावररत‍दकए‍जाएगं े। ताजलका‍22.12: स्ट्लम‍पनु ााुव ईपयजग‍पररुर‍ न्यनू तम‍प्लॉट‍ ऄजधकतम‍ एफएअर न्यनू तम‍ उाँचाइ क्षत्रे ‍ ग्राईंड‍कारेज मागाजव धकार (मी.)‍ (मी.)‍ स्ट्लम‍पुनाावु‍ 2000 पुनाावु‍पररयजजना‍के‍ 400 9 एनअर जडजाआन‍म‍ेंलचीलेपन‍के‍ (एएअइ‍/‍ऄजग्निमन‍ ागव‍मी.* जलए‍भूजम‍अाृि‍क्षेत्र‍ जाभाग‍और‍ऄन्य‍ (ुेटब,क्ु‍कज‍छजड़कर)‍पर‍ ुांजाजधक‍जनकायों‍ुे‍ कजइ‍प्रजतबंध‍नूीं‍ूजगा। मंजूरी‍के‍ऄधीन)‍ ऄन्य‍जनयत्रं ण 1. (*)‍ुाावजजनक‍अााु‍के‍मामल‍े म,ें दद.जा.प्रा.‍की‍तकनीकी‍ुजमजत‍न्यूनतम‍भूखंड‍के‍अकार‍म‍ें 10%‍की‍छूट‍द‍े ुकती‍ू।, 2. झुग्गी‍पुनाावु‍के‍जलए‍ददिा-जनदेि‍जनम्नजलजखत‍ू‍ैं(स्ट्थल-जाजिष्ट‍छूट‍कज‍अाश्यकतानुुार‍ऄपनाया‍जा‍ुकता‍ू), : i. स्ट्लम‍और‍जेज‍े क्लस्ट्टर‍(स्ट्ा-स्ट्थाने‍ईन्नयन‍/‍पुनाावु‍/‍स्ट्लम‍और‍जेज‍े क्लस्ट्टुव‍का‍पनु र्नाकाु, पुनाावु‍ कॉलजजनयां)‍और‍इडब्ल्यूएु‍ुाावजजनक‍अााु‍यजजनाओं‍के‍घनत्ा‍की‍ऄजधकतम‍ुीमा‍900‍डीयू‍/‍प्रजत‍ ूक्े टेयर‍ूजना‍चाजूए।176 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ii. स्ट्लम/जेजे‍कलस्ट्टर‍के‍पनु ाावु‍के‍जलए‍भूजम‍क्षेत्र‍जनधावररत‍भूजम‍जामुद्रीकरण‍के‍मा्यम‍ुे‍पीपीपी‍मॉडल‍के‍ अधार‍पर‍स्ट्लम‍पनु ाावु‍जाजनयम‍/‍नीजत‍के‍ऄनुुार‍जलया‍जाएगा।‍स्ट्लम‍पनु ाावु‍यजजना‍के‍जलए‍भूजम‍क्षेत्र‍ का‍न्यूनतम‍अााुीय‍घटक‍60%‍और‍लाभकारी‍ईपयजग‍के‍जलए‍ऄजधकतम‍क्षेत्र‍40%‍ूजना‍चाजूए। iii. आु‍यजजना‍की‍रूपरेखा‍भूजम‍के‍अााुीय‍घटक‍(लाभाथी‍ऄथावत‍् 60%)‍पर‍ऄजधकतम‍400‍एफएअर‍के‍ ुाथ‍ुंयुि ‍रूप‍ुे‍बनायी‍जाएगी।‍भूजम‍के‍लाभकारी‍घटक‍पर‍ऄजधकतम‍300‍एफएअर‍भूजम‍का‍ईपयजग‍ ूजने‍के‍बाद‍भी‍लाग‍ूूजगा। iv. दद.मु.यज.‍के‍प्रााधानों‍के‍ऄनुुार, दकुी‍भी‍ईपयजग‍/‍ईपयजगों‍के‍जमश्रण‍कज‍लाभकारी‍घटक‍में‍ऄनुमजत‍दी‍ जाएगी।‍यदद‍डीइ‍ईपयजगों‍के‍ुजम्मश्रण‍का‍प्रस्ट्ताा‍दते ा‍ू,, तज‍पार्ककग‍और‍जाकाु‍जनयंत्रण‍के‍मानदंड‍ प्रत्येक‍ईपयजग‍के‍जलए‍प्रयुि ‍एफएअर‍पर‍यथानुपात‍अधार‍पर‍लाग‍ूूोंगे। v. ्ााुाजयक‍जाकाु‍के‍जलए‍ऄनुमेय‍अााुीय‍एफएअर‍के‍10%‍का‍ईपयजग‍एक‍एकीकृत‍यजजना‍के‍रूप‍म‍ें दकया‍जाएगा।‍आु‍एफएअर‍के‍ईपयजग‍के‍जलए‍दकुी‍भी‍पृथक‍भूखंड‍का‍ुीमांकन‍नूीं‍दकया‍जाएगा। vi. ईपरजि ‍के‍ऄजतररि , घर‍अधाररत‍अर्नथक‍गजतजाजधयों‍(एमपीडी‍मानदंडों‍के‍ऄनुुार‍घरेल‍ू ईद्यजग)‍के‍जलए‍ 10%‍ऄनुमेय‍अााुीय‍एफएअर‍की‍ऄनुमजत‍ुामुदाजयक‍कायव‍स्ट्थलों‍के‍जाकाु‍के‍जलए‍दी‍जा‍ुकती‍ू।, vii. जाजिष्ट‍जस्ट्थजतयों‍म‍ें एक‍ुमग्र‍्ापक‍यजजना‍त,यार‍करने‍के‍जलए‍एक‍ूी‍स्ट्थल‍के‍ऄन्दर‍फ,ल‍े ुएए‍ कब्जाधारकों‍कज‍एकजत्रत‍करने‍की‍अाश्यकता‍पड़‍ुकती‍ू,।‍2000‍ागवमीटर‍ुे‍छजटे‍भूखंडों‍पर‍मजलन‍एा‍ं झुग्गी-झजपड़ी‍ क्लस्ट्टर‍ कज‍ ईपरजि ‍ ददिाजनदेिों‍ के‍ ऄनुुार‍ यथाात‍ पुनाावु‍ दकय‍े जाने‍ के‍ स्ट्थान‍ पर‍ स्ट्थानांतररत‍दकया‍जाना‍चाजूए। viii. एक‍क्लस्ट्टर‍में‍डीय ू के‍बीच‍अकजस्ट्मक‍ररि ‍स्ट्थान‍जनर्नमत‍करने‍के‍जलए‍जाजभन्न‍तलों‍पर‍भानों‍कज‍ररुेस्ट्ड‍ दकया‍जा‍ुकता‍ू।, ix. यजजनाओं‍में‍ईन‍ूररत‍क्षेत्रों‍कज‍प्रजत्ुाजूत‍दकया‍जाएगा,‍जूााँ‍पर‍एक‍बड़ा‍केंद्रीय‍ूररत‍/‍खुला‍स्ट्थान‍ जनर्नमत‍करना‍ुंभा‍नूीं‍ू,, छजटे‍ूररत‍क्षेत्र‍ईपलब्ध‍कराये‍जायेंगे। x. यजजनाओं‍कज‍ुंबंजधत‍जनकाय‍द्वारा‍ऄनुमजददत‍दकया‍जाएगा। xi. यजजनाए‍ं /‍जडजाआन‍िारीररक‍रूप‍ुे‍ऄक्षम‍्जि यों‍के‍ऄनुकूल‍ूजनी‍चाजूए। xii. ुामाजजक‍और‍भौजतक‍ऄास्ट्थापना‍के‍मानदडं ‍डीुीएन‍के‍ऄनुुार‍ूोंग‍े l ताजलका 22.13: छात्राााु ईपयजग‍पररुर‍ न्यनू तम‍प्लॉट‍ ऄजधकतम‍ एफएअर न्यनू तम‍ उाँचाइ क्षत्रे ‍ ग्राईंड‍कारेज मागाजव धकार (मी.)‍ (ाग‍वमी.) (मी.)‍ छात्राााु 500 30 120 -- 15 ऄन्य‍जनयत्रं ण i. ये‍मानदडं ‍जमजश्रत‍ईपयजग‍के‍ऄंतगतव ,‍छात्राााुों‍के‍जलए‍लागू‍नूीं‍ूोंगे। ii. कामकाजी‍पुरूी-जमू‍ला‍छात्राााुों‍के‍जलए‍मानदडं ‍‘‘‍ऄन्य‍ ‍ुामुदाजयक‍ुुजाधाओं’’‍के‍ऄंतग‍व प्रााधानों‍के‍ ऄनुुार‍ूोंगे।‍‍‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 177 ताजलका 22.14: र,न‍बुरे ा‍(नाआट‍िल्े टर) ईपयजग‍पररुर‍ न्यनू तम‍प्लॉट‍ ऄजधकतम‍ एफएअर न्यनू तम‍ उाँचाइ क्षत्रे ‍ ग्राईंड‍कारेज मागाजव धकार (मी.)‍ (ाग‍वमी.) (मी.)‍ र,न‍बुेरा‍(नाआट‍ 100 60 200 -- 26 िेल्टर) ताजलका 22.15: गस्ट्े ट‍ूाईु, लॉलजग‍और‍बजर्मडग‍ूाईु ईपयजग‍पररुर‍ न्यनू तम‍प्लॉट‍ ऄजधकतम‍ एफएअर न्यनू तम‍ उाँचाइ क्षत्रे ‍ ग्राईंड‍कारेज मागाजव धकार (मी.)‍ (ाग‍वमी.) (मी.)‍ गेस्ट्ट‍ूाईु, लॉलजग‍ 500 30 120 -- 15 और‍बजर्मडग‍ूाईु ऄन्य‍जनयत्रं ण i. ये‍मानक‍जमजश्रत‍ईपयजग‍के‍ऄतं गवत,‍ऄजतजथ-गृू‍के‍जलए‍लाग‍ूनूीं‍ूोंगे। ताजलका 22.16: कम‍ुघनता‍ााल‍ेअााुीय‍भखू डं ईपयजग‍पररुर‍ न्यनू तम‍प्लॉट‍ ऄजधकतम‍ एफएअर न्यनू तम‍ उाँचाइ क्षत्रे ‍ ग्राईंड‍कारेज मागाजव धकार (मी.)‍ (मी.)‍ कम‍घनत्ा‍ााल‍े अााुीय‍भूखंड ग्रीन‍डेालमेंट‍क्षेत्र‍के‍ऄनुुार ताजलका 22.17: फॉरन‍जमिन‍(अरएफ) ईपयजग‍पररुर‍ न्यनू तम‍प्लॉट‍ ऄजधकतम‍ एफएअर न्यनू तम‍ उाँचाइ क्षत्रे ‍ ग्राईंड‍कारेज मागाजव धकार (मी.)‍ (मी.)‍ फॉरन‍जमिन -- 25% 75 -- 15 ऄन्य‍जनयत्रं ण i. भूखंड‍क्षेत्र‍के‍50%‍की‍ऄजधकतम‍ुीमा‍के‍जलए‍भान‍के‍अारण‍रेखा‍तक‍बेुमेंट‍की‍ऄनमु जत‍दी‍जाएगी।‍बेुमटें ‍ क्षत्रे , यदद‍पार्ककग‍और‍ुेााओं‍के‍जलए‍ईपयजग‍दकया‍जाता‍ू,, की‍गणना‍एफएअर‍में‍नूीं‍की‍जाएगी। ii. ऄनुमजददत‍ल-े अईट‍प्‍लान‍‍के‍भाग‍के‍रूप‍म‍ें जनम्न‍ जलजखत‍ईपयजग‍पररुरों‍कज‍फॉरेन‍जमिन‍ईप-ईपयजग‍जजन‍म‍ें ऄनुमजत‍दी‍जाएगी:‍फॉरेन‍जमिन,‍अााु‍(जमिन‍कम्रचाररयों‍के‍जलए),‍ऄजतजथ‍गृू,‍स्ट्‍थानीय‍बाजार,‍बैंक,‍ मनजरंजनात्‍मक‍क्ल‍ ब,‍ूल्े ‍थ‍ुेंटर-ऄस्ट्‍पताल,‍तृतीयक‍स्ट्‍ाास्ट्‍्‍य‍देखभाल‍केंद्र‍जडस्ट्प‍ ेंुरी,‍एकीकृत‍अााुीय‍स्ट्‍कूल,‍178 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ुांस्ट्‍कृजतक‍एां‍ुूचना‍केंद्र,‍पुजलु‍चौकी,‍दमकल‍केंद्र,‍डाक‍एां‍तार‍कायावलय‍। अााुीय‍ईपयजग‍क्षत्रे ‍ु‍ेुबं जं धत‍ऄन्य‍जनयत्रं ण 1. मानदंडों‍के‍ऄनुुार,‍ुामुदाजयक‍और‍स्ट्थानीय‍ुुजाधाएं‍प्रदान‍की‍जाएगं ी।‍आुके‍ऄजतररि , आन‍ुुजाधाओं‍के‍ प्रााधान‍के‍जलए‍जनम्नजलजखत‍पर‍जाचार‍दकया‍जाएगा: i. आन‍ुुजाधाओं‍कज‍न्यनू तम‍12‍मीटर‍मागावजधकार‍ााले‍अंतररक‍ुड़कों‍के‍ुाथ‍प्रदान‍दकया‍जाना‍ चाजूए, बिते‍ऐुा‍जनर्ददष्ट‍दकया‍गया‍ूज।‍ुंबंजधत‍क्षेत्रों‍में‍ईपलजब्ध‍का‍अकलन‍करने‍के‍जलए‍ ऄास्ट्थापना‍के‍जाकाु‍का‍जनरीक्षण‍दकया‍जाना‍चाजूए। ii. पार्ककग‍की‍अाश्यकताएं‍पार्ककग‍मानदडं ों‍के‍ऄनुुार‍ूोंगी। iii. क्लस्ट्टर‍स्ट्तर‍पर‍कुल‍लॉट‍का‍न्यूनतम‍अकार‍125‍ागवमीटर‍ूजगा। iv. कॉमन‍पार्ककग‍स्ट्पेु‍और‍खले ‍के‍म,दान‍कज‍ुाझा‍करन‍े की‍ुुजाधा‍के‍जलए‍क्लस्ट्टर‍के‍रूप‍म‍ें स्ट्कूलों‍और‍ अंगनााजड़यों‍के‍जलए‍स्ट्थान‍लअे ईट‍प्लान‍म‍ेंबनाया‍जाना‍चाजूए। v. भौजतक‍ऄाुंरचना,‍ऄथावत्‍भूजमगत‍टंकी, ुीारेज-पंलपग‍प्रणाली, ाीावजल‍ुंचयन, दजूरी‍पाआप‍ प्रणाली, ऄपजिष्ट‍पृथक्करण‍क्षत्रे , जाद्युत‍ईप-केंद्र, खंभे‍पर‍स्ट्थाजपत‍आलेजक्रक‍रांुफामवर, जाकेन्द्रीकृत‍ मल-ुीारेज‍िजधन‍मानदंडों‍के‍ऄनुुार‍बनाए‍जान‍े चाजूए। 2. ुुरक्षा‍अाश्यकताओं‍ुजूत,‍ुचं रण‍प्रणाली‍ुे‍ुंबंजधत‍अााुीय‍नेबरुएड़‍की‍यजजना‍कज बीअइएु‍मानकों‍या‍ ुंबंजधत‍एजेंजुयों‍के‍मानदंडों‍के‍ऄनुुार‍िाजुत‍दकया‍जाएगा। 3. नेबरुएड‍के‍जलए‍ऄनुकूल‍भूदश्ृ यांकन‍यजजनाओं‍कज‍पाकों‍और‍ुड़क‍दकनारे‍ाृक्षारजपण‍अदद‍के‍जाकाु‍के‍जलए‍ त,यार‍दकया‍जाएगा। 4. यजजनाएाँ/‍जडजाआन‍दद्ांग‍्जि यों‍के‍जलए‍ऄनुकूल‍ूजना‍चाजूए। 5. ुभी‍यजजनाओं, ल-े अईट‍और‍यजजनाओं‍कज‍ुंबंजधत‍एजेंजुयों‍द्वारा‍ऄनुमजददत‍दकया‍जाएगा। 6. बेुमेंट,‍यदद‍जनर्नमत‍दकया‍गया‍ूज और‍आुका‍ईपयजग‍केाल‍पार्ककग,‍जनुुजाधाओं‍और‍ुेााओं‍के‍जलए‍दकया‍ गया‍ूज, तज‍ईुकी‍गणना‍एफएअर‍में‍नूीं‍की‍जाएगी। 7. जस्ट्टल्ट्ु:‍यदद‍भान‍का‍जनमावण‍ग,र-जनााु‍यजग्य/‍जनधावररत‍उाँचाइ‍के‍जस्ट्टल्ट‍क्षेत्र‍के‍ुाथ‍दकया‍जाता‍ू‍, और‍ पार्ककग,‍भूदश्ृ यांकन‍अदद‍के‍जलए‍ईपयजग‍दकया‍जाना‍प्रस्ट्ताजात‍ू,, तज‍जस्ट्टल्ट‍फ्लजर‍कज‍एफएअर‍म‍ें ुजम्मजलत‍ दकये‍जाने‍की‍अाश्यकता‍नूीं‍ू‍,और‍उाँचाइ‍के‍जलए‍आुकी‍गणना‍की‍जाएगी। 8. फायर‍टेंडर‍के‍ऄजनाायव‍अाागमन‍ााल‍ेुड़क‍पर‍पार्ककग‍की‍ऄनुमजत‍नूीं‍दी‍जाएगी। 9. ऄजतररि ‍एफएअर‍पर‍िुल्क‍ुमय-ुमय‍पर‍ुरकार‍के‍ऄनुमजदन‍के‍ुाथ‍ऄजधुूजचत‍दरों‍पर‍लगाया‍जाएगा। 10. ुंबद्ध‍जाजनयमों‍में‍यथा‍जाजनर्ददष्ट‍‍ऄथाा‍प्राजधकरण‍के‍ऄनमु जदन‍के‍ऄनुुार‍जािेी‍मामलों‍में‍जनम्न‍ ‍ (ओऄर)‍मानदडं ‍ऄपनाए‍जाएंगे।‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 179 22.9‍्ााुाजयक‍ 22.8.1 ुामान्य‍्ापार‍और‍्ाुाय क. ईपयजग‍पररुर‍एा‍ंपररभाीाए ाँ ताजलका 22.18: ईपयजग‍पररुर‍एा‍ंपररभाीा‍-‍्ाुाय क्र.ु.ं ईपयजग‍पररुर‍ पररभाीा 1. ररटेल‍िॉप ईपभजि ा‍कज‍ास्ट्तओंु ‍की‍ुीधी‍जबक्री‍करने‍की‍एक‍ऐुी‍दकु ान‍जजुमें‍ अाश्यक‍भडं ारण‍स्ट्थान‍भी‍ू।, 2. ररपेयर‍िॉप घरेलू‍ुामान, आलेक्रॉजनक‍ग,जटे , ऑटजमजबाआल, ुाआदकल‍अदद‍की‍मरम्मत‍ के‍जलए‍खुदरा‍दकु ान‍ज,ुी‍ूी‍िॉप। 3. पुवनल‍ुर्नाु‍िॉप खुदरा‍दकु ान‍ज,ुी‍ूी‍दकु ान‍जूां‍दजी,‍नाइ‍अदद‍पुवनल‍ुेााएं‍दी‍जाती‍ू।ैं 4. ाेंलडग‍बथू /‍दकयजस्ट्‍क बूथ‍के‍रूप‍म‍ेंएक‍दकु ान‍जूां‍यांजत्रक‍ईपकरणों‍की‍मदद‍ुे‍या‍ऄन्यथा‍दकुी‍ तरीके‍ुे‍द,जनक‍जरूरतों‍के‍ुामान‍की‍जबक्री‍की‍जाए। 5. ुुजाधा‍िॉलपग‍ुेंटर अााुीय‍क्षेत्र‍में‍ऐुी‍दकु ानों‍का‍ुमूू‍जज‍लगभग‍5,000‍्जि यों‍की‍ अबादी‍कज‍ुेाा‍दे‍रूा‍ूज। 6. लजकल‍िॉलपग‍ुेंटर अााुीय‍क्षेत्र‍में‍ऐुी‍दकु ानों‍का‍ुमूू‍जज‍10,000‍्जि यों‍की‍अबादी‍कज‍ ुेाा‍प्रदान‍कर‍रूा‍ूज। 7. कायावलय कायावलय‍अदद‍के‍जलए‍आस्ट्तेमाल‍दकया‍जान‍े ााला‍स्ट्थान। 8. बैंक बैंककग‍कायव‍और‍ुंचालन‍करन‍े के‍जलए‍बैंककग‍कायावलय‍पररुर। 9. मजटर‍गर, ाज‍और‍ाकविॉप ऑटजमजबाआल‍की‍ुर्नालुग‍और‍मरम्मत‍ूते ु‍पररुर। 10. जुनेमा‍/‍जुनेप्लेक्ु‍/‍ दफल्मों‍और‍जचत्रों‍के‍प्रुारण‍की‍ुुजाधाओं‍ााला‍पररुर‍और‍जूां‍दिवकों‍कज‍ मल्टीप्लेक्ु जबठाने‍के‍जलए‍काड़व‍स्ट्थान‍ूज। 11. रेस्ट्टजरेंट ऐुा‍पररुर‍जूां‍खाना‍पकाने‍की‍ुुजाधाओं‍के‍ुाथ‍्ााुाजयक‍अधार‍पर‍ खाद्य‍पदाथों‍कज‍जखलान‍े की‍भी‍ुुजाधा‍ूज।‍यूााँ‍ब,ठने‍की‍्ास्ट्था‍के‍जलए‍ छतदार‍या‍खलु ी‍जगू‍या‍दजनों‍ुुजाधाएं‍ूज‍ुकती‍ू।ैं 12. ्ााुाजयक‍गजतजाजधयााँ ्ााुाजयक‍गजतजाजधयां‍का‍ऄथ‍वाे‍गजतजाजधयां‍ूजगा‍जजनमें‍्ााुाजयक‍ कौिल‍के‍अधार‍पर‍ुेााएं‍िाजमल‍ू,ैं ज,ुे‍डॉक्टर, ाकील,‍अर्दकटेक्ट, और‍ चाटवडव‍ऄकाईंटेंट, कंपनी‍ुेक्रेटरी, कॉस्ट्ट‍एंड‍ाक्ुव‍ऄकाईंटेंट, आंजीजनयर, टाईन‍ प्लानर, मीजडया‍प्रजफेिनल‍और‍डॉक्यूमेंरी‍दफल्म‍मेकर, म,नेजमेंट‍प्रजफेिनल‍ और‍अूार‍जािेीज्ञ /‍पजीण‍जािेीज्ञ। 13. ुाप्ताजूक‍बाजार ऐुा‍क्षेत्र‍जजुे‍बाजार‍के‍रूप‍म‍ें ऄनौपचाररक‍दकु ान‍प्रजतष्ठानों‍के‍ुमूू‍द्वारा‍ ुप्ताू‍में‍एक‍बार‍ईपयजग‍म‍ेंलाया‍जाता‍ू।, ‍ये‍बाजार‍ुप्ताू‍के‍जाजभन्न‍ददनों‍ में‍एक‍क्षत्रे ‍ु‍ेदुू रे‍क्षेत्र‍म‍ेंजिफ्ट‍दकए‍जाते‍ू।ैं 14. ऄनौपचाररक‍क्षत्रे ‍आकाइ खुदरा/ुेाा‍आकाइ,‍जस्ट्थर‍ऄथाा‍चलती-दफरती, छत‍के‍जबना‍काम‍करना‍ जजनमें‍ुड़क‍के‍दकनारे‍छजटे‍खजखे‍िाजमल‍ू।ैं फेरी‍ााला‍(स्ट्रीट‍ाेंडर)‍-‍ऐुा‍्जि ‍जज‍जबना‍स्ट्थायी‍जनर्नमत‍ुंरचना‍के‍ लेदकन‍ऄस्ट्थायी‍स्ट्थ,जतक‍ुंरचना‍या‍चलत‍े दफरत‍े स्ट्टॉल‍(या‍ूडे ‍लजड)‍की‍ मदद‍ुे‍जनता‍कज‍ुामान‍या‍ुेााओं‍की‍जबक्री‍करता‍ू।,180 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] नजट:‍छजटी‍िॉप:‍ऄजधकतम‍20‍ागव‍मीटर‍क्षेत्रफल‍की‍िॉप‍जज‍ररटेल‍और‍व्‍यदकतगत‍ुेाा‍ुंबंधी‍व्‍यापार‍और‍कायव‍में‍ूज‍ जजुमें‍जबलल्डग‍म,टेररयल‍की‍ररटेल‍िॉप,‍ऑटजमजबाआल‍की‍ररपजयर‍िॉप/ाकविॉप,‍टायर‍रीुजललग‍और‍री-रीलडग,‍और‍ ब,टरी‍चार्मजग,‍स्ट्‍टजरेज,‍गजदाम‍तथा‍ाेयरूाईलुग,‍जंक‍िॉप‍(पेपर‍और‍ग्ल‍ ाु‍ाेस्ट्‍ट‍कज‍छजड़कर),‍िराब‍की‍दकु ान,‍ लप्ररटग,‍रंगाइ‍एां‍ार्ननलिग।‍‍ ख. ऄनमु ये ‍गजतजाजधया ं ताजलका 22.19 : ईपयजग‍पररुर‍एा‍ंऄनमु ये ‍गजतजाजधया‍ं-‍्ााुाजयक क्र.ु.ं ईपयजग‍जजन‍ अरडी ुी1 ईपयजग‍पररुर 1 2 3 4 5 6 7 8 एम ुजु ाधा‍बाजार‍ लजकल‍िॉलपग‍ ुर्नाु‍ ऄनौपचा कम्य‍ ु एनए जडजस्ट्रक‍ ुीुी (ुीएुुी) ुटें र‍ मार्दकट ररक‍ जनटी‍ चुी ुटें र‍/‍ (एलएुुी) बाजार ुटें र‍ ईप‍ (ुी ुीबीडी‍ ुी)‍ /‍ईप‍ ऄनमु ये ‍ िूर‍ गजतजाजधया ं स्ट्तर‍के‍ ्ााुा जयक‍ क्षत्रे ‍ 1. ररटेल‍िॉप छजटी‍ छजटी‍   दकु ानें दकु ानें     2. जमल्क‍बूथ, फल‍       और‍ 3. औीजधयों‍और‍ दााओं‍के‍      स्ट्टॉदकस्ट्ट‍एां‍ डीलर 4. ईजचत‍मूल्य‍की‍   दकु ान 5. मरम्मत‍/‍ुेाा        6. पुवनल‍ुर्नाु‍         िॉप 7. कायावलय        8. स्ट्थानीय‍जनकायों, ुाावजजनक‍ईपक्रम‍       के‍कायावलय[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 181 9. ुम्मेलन‍की‍    ुुजाधा‍ 10. जुनेमा, जुनेप्लेक्ु,     मल्टीप्लेक्ु 11. ूजटल    12. गेस्ट्ट‍ूाईु     13. ुर्नाु‍ऄपाटवमेंट    14. रेस्ट्टजरेंट       15. बैंक्वेट‍ूॉल    16. ुामाजजक- ुांस्ट्कृजतक‍     गजतजाजधयााँ‍/‍ मनजरंजन‍क्लब‍/ 17. कजलचग‍ुेंटर‍/‍      प्रजिक्षण‍ुस्ट्ं थान 18. पुजलु‍पजस्ट्ट,     फायर‍पजस्ट्ट। 19. पेरजल‍पपं ‍/‍    ुीएनजी‍स्ट्टेिन 20. बु‍टर्नमनल   21. बुए-स्ट्तरीय‍पार्ककग    22. ुेाा‍बाजार, मजटर‍गर, ाज‍और‍       कायिव ाला‍ 23. बैंक       24. एटीएम         25. ऄनौपचाररक‍क्षत्रे ‍         आकाइ 26. नर्मुग‍ूजम‍/‍     प्रुूजत‍गृू‍अदद। 27. औीधालय,     जक्लजनकल‍ल,ब, 28. जक्लजनक‍और‍       पॉलीजक्लजनक182 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 29. पाथ‍ल,ब, डायग्नजजस्ट्टक‍     फ,जुजलटी 30. स्ट्पा, जजम‍और‍       ु,लून 31. ुंग्रूालय‍/‍अट‍व    ग,लरी 32. क्रेच‍/‍डे‍केयर         1 जनयंत्रण‍और‍ुुरक्षा‍ुंबंधी‍जाचारों‍के‍ऄ्यधीन नजटः i. जन-ईपयजगी‍ुेााएाँ, ुाावजजनक‍ुुजाधाओं‍कज‍मानदडं ों‍के‍ऄनुुार‍प्रदान‍दकया‍जाएगा। ii. मेरजपॉजलटन‍जुटी‍ुेंटर, जडजस्ट्रक‍ुेंटर‍और‍कम्‍युजनटी‍ुेंटर‍में‍जनधावररत‍मानकों‍के‍ऄनुुार‍पार्ककग‍की‍ऄजनााय‍व ऄपेक्षा‍कज‍मल्टी‍लेाल‍पार्ककग‍के‍जनमावण‍ुे‍पूरा‍दकया‍जाएगा। ग. जाकाु‍जनयत्रं ण‍मानदडं ‍ ताजलका 22.20 : ्ााुाजयक क्र.ु.ं ईपयजग‍पररुर‍ ु.ं न्यनू तम‍प्लॉट‍ ऄजधकतम‍ एफएअर न्यनू तम‍ उाँचाइ क्षत्रे ‍ ग्राईंड‍ मागाजव धकार (ागमव ीटर)‍/‍ कारेज (मी.)‍ यजू नट‍ क. स्ट्थानीय 10,000‍तक‍जनुंख्या 1 ुुजाधा‍िॉलपग‍ुेंटर‍ 2 1000 50% 100 12 एनअर (ुीएुुी)‍‍ 2 लजकल‍िॉलपग‍ुेंटर‍ 1 3000 50% 100 18 एनअर (एलएुुी)‍‍ ऄन्य‍जनयत्रं णः i. ्ााुाजयक‍केंद्रों‍की‍एकीकृत‍यजजनाओं‍के‍मामले‍म,ें ुमय-ुमय‍पर‍ुक्षम‍प्राजधकारी‍द्वारा‍ऄजधुूजचत‍ ऄपेजक्षत‍प्रभार‍के‍भुगतान‍के‍ऄ्यधीन,‍्ााुाजयक‍केंद्रों‍के‍ुंबंजधत‍पदानुक्रम‍के‍ऄनुमत‍ईपयजग‍के‍जलए‍ भूखंडों‍के‍ुमामेलन‍और‍ईप-जाभाजन‍की‍ऄनुमजत‍ू।, ii. एलएुुी‍में‍केाल‍एररयम‍जनर्नमत‍करन‍े के‍जलए‍ऄजधकतम‍10%‍ऄजतररि ‍ग्राईंड‍कारेज‍की‍ऄनुमजत‍दी‍ जाएगी। iii. यदद‍एररयम‍के‍जलए‍ऄनुमेय‍ऄजतररि ‍ग्राईंड‍कारेज‍का‍ईपयजग‍दकया‍जाता‍ू,, तज‍ईपयजग‍दकए‍गए‍ग्राईंड‍ कारेज‍का‍25%‍एफएअर‍म‍ेंजगना‍जाएगा। 3 ुेाा‍बाजार 1 2000 50% 100 18‍मी. एनअर 4 ऄनौपचाररक‍क्षत्रे ‍बाजार 1 1000 50% 40 18‍मी. एनअर एलएुुी‍/‍ुीएुुी‍के‍ऄप्रयि ु ‍स्ट्थलों‍के‍लगभग‍10%‍कज‍ुेाा‍बाजारों‍में‍पररार्नतत‍दकया‍जा‍ुकता‍ू।, ‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 183 क्र.ु.ं ईपयजग‍जजन‍ ु.ं न्यनू तम‍ ऄजधकतम‍ एफएअर न्यनू तम‍ उाँचाइ प्लॉट‍क्षत्रे ‍ ग्राईंड‍कारेज मागाजव ध (ागमव ीटर)‍/‍ कार यजू नट (मी.)‍ ्ााुाजयक‍केंद्र ुामदु ाजयक‍ जनुंख्या‍1,00,000‍ 1 कम्‍यजु नटी‍ुेंटर‍(ुीुी)‍ 1 20,000 50% 125 30‍मी. एनअर‍ एलएुुी‍म‍ें केाल‍एररयम‍जनर्नमत‍करन‍े के‍जलए‍ऄजधकतम‍10%‍ऄजतररि ‍ग्राईंड‍कारेज‍की‍ऄनुमजत‍दी‍ जाएगी। यदद‍एररयम‍के‍जलए‍ऄनुमेय‍ऄजतररि ‍ग्राईंड‍कारेज‍का‍ईपयजग‍दकया‍जाता‍ू,, तज‍ईपयजग‍दकए‍गए‍ग्राईंड‍ कारेज‍का‍25%‍एफएअर‍म‍ेंजगना‍जाएगा। ईप-िूर जनुंख्या‍5,00,000 1 जडजस्ट्रक‍ुेंटर‍(डीुी)‍/‍ 1 10 ूक्े ट‍ेयर‍ 50% 150 30‍मी. एनअर ईप-केंद्रीय‍्ापार‍जजला‍ /‍ईप-िूरी‍स्ट्तर‍के‍ ्ााुाजयक‍क्षत्रे i. एलएुुी‍म‍ें केाल‍एररयम‍जनर्नमत‍करन‍े के‍जलए‍ऄजधकतम‍10%‍ऄजतररि ‍ग्राईंड‍कारेज‍की‍ऄनुमजत‍दी‍ जाएगी। यदद‍एररयम‍के‍जलए‍ऄनुमेय‍ऄजतररि ‍ग्राईंड‍कारेज‍का‍ईपयजग‍दकया‍जाता‍ू,, तज‍ईपयजग‍दकए‍गए‍ग्राईंड‍ कारेज‍का‍25%‍एफएअर‍म‍ेंजगना‍जाएगा। ुर्नाु‍माकेट‍और/ऄथाा‍ऄनौपचाररक‍माकेट‍के‍जलए‍ऄजधकतम‍10%‍ऄजतररक्त‍ ‍ग्राईण्ड‍ ‍कारेज‍की‍ऄनुमजत‍ ii ूजगी।‍ िूर‍ जनुंख्या‍20,00,000 मरे जपॉजलटन‍जुटी‍ुटें र‍/‍ुीबीडी 1 कमर्नियल‍प्लॉट:‍ररटेल‍ 25% 150 मौजूदा‍ एनअर एा‍ंकॉमु‍वमरे जपॉजलटन‍ रूप‍म ें जुटी‍ुटें र‍ऄथातव ‍्कनॉट‍ प्लुे ‍और‍ईुका‍ एक्ुटेंिन ‍ ऄन्य‍जनयत्रं ण i. भूखंड‍का‍अकार‍्ााुाजयक‍क्षेत्र‍के‍लेअईट‍में‍जनधावररत‍दकए‍ऄनुुार‍ूजगा,‍‍कनॉट‍प्लेु‍और‍ईुके‍ जास्ट्तार‍क्षेत्र‍म‍ेंभूखंड‍का‍कजइ‍भी‍ईप-जाभाजन‍करने‍की‍ऄनमु जत‍नूीं‍ूजनी‍चाजूए। ii. जाकाु‍ुंबंधी‍जनयंत्रण‍स्ट्थानीय‍जनकाय‍द्वारा‍क्षेत्र‍की‍्ापक‍यजजना‍के‍ऄनुुार‍जनधावररत‍दकए‍जाएंगे। क. कनॉट‍प्लेु‍के‍मामले‍म,ें मौजूदा‍उाँचाइ‍बनाए‍रखी‍जाएगी‍और‍अनुपाजतक‍ग्राईंड‍कारेज‍कज‍बढ़ाकर‍ एफएअर‍ूाजुल‍दकया‍जा‍ुकता‍ू।,184 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ख. कनॉट‍प्लेु‍के‍म्य(आनर)‍ुकवल‍म‍ेंदकुी‍भी‍बेुमेंट‍की‍ऄनमु जत‍नूीं‍ूजगी। ग. ऄजनाायव‍ाास्ट्तुकला‍जनयंत्रण‍लागू‍ूोंगे। iii. ्ापक‍यजजनाओं‍के‍ऄंतगवत‍जाकजुत‍दकए‍गए‍भूखडं ों‍के‍जलए, ऄनुमत‍एफएअर‍ा,ध‍पट्टा‍जालेख‍के‍ऄनुुार‍ ूजगा। 2 फायर‍जब्रगडे ‍लने ‍और‍ - - 25% 150 मौजूदा‍ एनअर जनपथ‍लने ‍म‍ें रूप‍म ें ्ााुाजयक‍पररुर i. ग्राईंड‍कारेज‍और‍एफएअर‍की‍गणना‍ातवमान‍में‍ईपलब्ध‍भखू ंडों‍के‍क्षेत्र‍पर‍की‍जाएगी। ii. आु‍क्षेत्र‍कज‍्ापक‍यजजना‍के‍अधार‍पर‍जाकजुत‍दकया‍जाएगा। कजइ‍ऄन्य‍्ााुाजयक‍केंद्र 1 ग,र-श्रेणीबद्ध‍्ााुाजयक‍ - - 50% 125 - एनअर केंद्र‍(एनएचुीुी) 2 जजुम‍ें रेलाे‍/‍ 3‍ूक्े टेयर‍ 25% 100 एनअर एमअरटीएु‍स्ट्टेिन‍/‍ तक अइएुबीटी‍के‍ुाथ‍ ्ााुाजयक‍घटक‍ िाजमल‍ू‍ैं ुांजाजधक‍मंजूरी‍के‍ऄ्यधीन।‍‍जाकाु‍ुंबंधी‍जनयंत्रण‍ऄनुमजददत‍यजजना‍के‍ऄ्यधीन‍जभन्न-जभन्न‍ूज‍ुकते‍ू।, 3 अुफ‍ऄली‍रजड़ - - 80% 200 18‍मी. 20 (ददल्ली‍गेट-ऄजमेरी‍गेट‍ यजजना‍में‍्ााुाजयक‍ पट्टी‍के‍रूप‍म‍ेंददखाया‍ गया‍क्षेत्र) ुेटब,क‍ऄजनाायव‍नूीं‍ू।ैं ‍पनु र्ननमावण‍के‍मामले‍म‍ेंपार्ककग‍के‍जलए‍जस्ट्टल्ट‍जनर्नमत‍दकए‍जाएगं े। 4 मौजूदा‍ऄस्ट्थायी‍जुनेमा‍ 1200‍ 50%‍ क.‍ 100 18‍मी. 15‍मी. (एक‍या‍ईुुे‍ऄजधक‍ ागवमीटर-‍ एमपीडी‍के‍ ऄजधकतम‍ जुनेमा‍ूॉल‍म‍ेंन्यूनतम‍ 4000‍ ऄनुुार‍ 3000‍ 300‍ुीटें)‍ न्यूनतम‍ ागवमीटर ागवमीटर‍के‍ ुेटब,क‍के‍ यदद‍दकुी‍ जनर्नमत‍क्षेत्र‍ ऄ्यधीन‍ जुनेमा‍के‍ के‍ पालन‍दकया‍ पाु‍ऄजधक‍ ऄ्यधीन।‍ जाएगा। भूजम‍ू,, तज‍ िेी‍क्षेत्र‍कज‍ ख.‍ यदद ूरा-भरा‍ प्लॉट‍का‍ रखा‍ अकार‍ जाएगा। आुुे‍ ऄजधक‍ू‍, और‍यू‍24‍ मी.‍के‍ मागावजधकार (मागावजधका र) और‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 185 ईुुे‍ ऄजधक‍पर‍ जस्ट्थत‍ू,, तज‍ ऄजधकतम‍ एफएअर 4000‍ाग‍व मीटर ुे‍ ऄजधक‍नूीं‍ ूजना‍ चाजूए। क. नए‍ ऄस्ट्थायी‍ जुनेमाघर‍ जनर्नमत‍ करन‍े की‍ ऄनुमजत‍नूीं‍ूजगी, ूालांदक‍ पूल‍े ुे‍ मौजूद‍ ऄस्ट्थायी‍ जुनेमाघरों‍कज‍जनधावररत‍ितों‍के‍ऄनुुार‍स्ट्थायी‍अधार‍पर‍जारी‍रखन‍े की‍ऄनुमजत‍दी‍जाएगी। ख. 300‍ुीटों‍की‍क्षमता‍ााले‍जुनेमा‍ूॉल‍के‍जलए‍अाश्यक‍स्ट्थान‍कज‍छजड़कर‍्ााुाजयक‍गजतजाजधयां‍ ऄनुमेय‍ूोंगे।‍्ााुाजयक‍स्ट्थान‍लजकल‍िॉलपग‍ुेंटर‍(एलएुुी)‍के‍जलए‍यथानुमत‍गजतजाजधयां‍के‍ जलए‍ूी‍ददया‍जाएगा। ग. जुनेमा,‍ जुनेम,टजग्राफी‍ ऄजधजनयम‍ और‍ ऄन्य‍ ुांजाजधक‍ प्रााधानों‍ का‍ ऄनुपालन‍ करेगा।‍ तदनुुार‍ मल्टीप्लेक्ु‍की‍ऄनुमजत‍दी‍जाएगी। घ. भूजम‍ईपयजग‍रूपांतरण‍प्रभार, एफएअर‍प्रभार, बेूतरी‍प्रभार‍और‍ऄन्य‍प्रभार‍ुमय-ुमय‍पर‍ुरकार‍ द्वारा‍यथा‍ऄनुमजददत‍ऄनुुार‍लगाए‍जाएंगे। ङ. ुरकारी‍भूजम‍पर‍चल‍रूा‍ऄस्ट्थायी‍जुनेमा‍नूीं‍रूगे ा। च. ऐुे‍मामलों‍में‍ऄजतररि ‍भूजम‍यदद‍दकुी‍बड़े‍ुाावजजनक‍ईद्देश्यों‍के‍जलए‍अाश्यक‍ू,, तज‍ईन्ू‍ें ऄजधगृूीत‍दकया‍जाएगा‍और‍ईुे‍ुंबंजधत‍स्ट्थानीय‍एजेंजुयों‍द्वारा‍मानदंडों‍के‍ऄनुुार‍जाकजुत‍दकया‍ जाएगा। छ. यू‍ुुजनजित‍दकया‍जाना‍चाजूए‍दक‍ुंबंजधत‍भूखंड‍क्षेत्रों‍के‍भीतर‍पयावप्त‍पार्ककग‍ुुजाधा‍प्रदान‍की‍ जाए। ज. स्ट्थानीय‍जनकाय‍और‍लाआुेंलुग‍प्राजधकरण‍यू‍ुुजनजित‍करेंगे‍दक‍लाआुेंु‍का‍‍नाीकरण‍करन‍े ु‍े पूल‍े ईपयुवि ‍ितों‍का‍ऄनुपालन‍दकया‍जाए। झ. ्जि गत‍मामलों‍पर‍ईपयुवि ‍प्रााधानों‍के‍ऄनुुार‍कारवााइ‍की‍जाएगी। दकुी‍भी‍ऄन्य‍्ााुाजयक‍केंद्र‍के‍जलए‍ऄन्य‍जनयत्रं ण i. ुांजाजधक‍मंजूरी‍के‍ऄ्यधीन।‍जाकाु‍ुंबंधी‍जनयंत्रण‍ऄनुमजददत‍यजजना‍के‍ऄ्यधीन‍जभन्न-जभन्न‍ूज‍ ुकते‍ू।, ऄन्य‍जनयत्रं ण‍ i. ऄजतररि ‍एफएअर‍प्रभार,‍रूपान्तरण‍प्रभार, बेूतरी‍प्रभार/बाूरी‍जाकाु‍प्रभार‍अदद‍ुमय-ुमय‍पर‍ुरकार‍ द्वारा‍तय‍दकए‍ऄनुुार‍लगाए‍जाएंगे। ii. भारतीय‍जामानपिन‍प्राजधकरण‍और‍जीएनुीटीडी‍के‍ऄजग्निमन‍जाभाग‍की‍‍मंजूरी‍के‍ऄ्यधीन‍कजइ‍प्रजतबंध‍ नूीं। iii. भारतीय‍जामानपिन‍प्राजधकरण‍ु‍े उाँचाइ‍ुंबंधी‍प्रजतबंध‍के‍दकुी‍भी‍मामल‍े में,‍स्ट्थल‍पर‍ार्नधत‍एफएअर‍ ूाजुल‍करन‍े के‍जलए 40%‍के‍बजाय‍50%‍तक‍ग्राईंड‍कारेज‍ऄनुमेय‍ूजगा।186 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] iv. एनअर‍-‍कजइ‍प्रजतबंध‍नूीं, भारतीय‍जामानपिन‍प्राजधकरण, ददल्ली‍ऄजग्न‍िमन‍ुेाा‍और‍ऄन्य‍ुांजाजधक‍ जनकायों‍की‍मंजूरी‍के‍ऄ्यधीन। v. एफएअरः 30‍मी.‍मागावजधकार‍(मागावजधकार)‍ुे‍कम‍पर‍325 एफएअर मानदंड‍ऄथाा‍30‍मी‍मागावजधकार‍ (मागावजधकार)‍ुे‍ऄजधक‍पर‍375 एफएअर मानदंड‍और‍40%‍ग्राईंड‍कारेज‍आन‍ुब‍पर‍लागू‍ूजगा‍(I) ईन‍ ूजटलों‍पर‍जजनम‍ें कमर्नियल‍ुेंटर,‍कम्‍यजु नटी‍ुेंटर, जडजस्ट्रक‍ुेंटर/ईप-केंद्रीय‍्ापार‍जज़ला/ईप-नगर‍स्ट्तर‍के‍ ्ााुाजयक‍क्षेत्र‍और‍मेरजपॉजलटन‍जुटी‍ुेंटर/ुेंरल‍जबजनेु‍जडजस्ट्रक्ट, एलबीजेड‍क्षेत्र जुजाल‍लाआंु‍बंग्लज‍क्षत्रे ‍ में‍जस्ट्थत‍कज‍छजडकर‍और‍धरजूर‍ुंरचनाओं‍पर‍जस्ट्थत‍ूजटल‍भूखंड‍िाजमल‍ू‍ैं और‍(II) ूजटल-ुू-्ााुाजयक‍ भूखंडों‍ पर।‍ यू‍ खंड‍ 4.4‍ म‍ें ईजल्लजखत‍ ूजटलों‍ की‍ ुभी‍ श्रेजणयों‍ पर‍ लाग‍ू ूजगा।‍ कमर्नियल‍ ुेंटरों‍और‍ मेरजपॉजलटन‍जुटी‍ुेंटर/ुेंरल‍जबजनेु‍जडजस्ट्रक्ट‍के‍ुाथ-ुाथ‍ूजटल-ुू-कमर्नियल‍प्लॉट‍के‍जलए‍एफएअर, जूां‍एफएअर‍का‍अांटन‍मलू ‍पट्टे‍की‍ितों‍के‍ऄनुुार‍ूजगा‍और‍यू‍ईु‍ुीमा‍तक‍स्ट्ा‍ त:‍बढ़ाए‍गए‍मान‍े जाएंगे,‍केाल‍आु‍प्रयजजनाथ‍व यदद‍ईपलब्ध‍नूीं‍ूज। vi. जन-ईपयजगी‍ुेााओं‍ज,ुे‍दक‍भूजमगत‍जल‍भंडारण‍टैंक, छत‍पर‍जल‍ुंचयन‍प्रणाली, ऄलग-ऄलग‍ुूखे‍और‍ गील‍े डस्ट्टजबन, डाक-ुुपुदगव ी‍काईंटर‍अदद‍की‍्ास्ट्था‍भूखडं ‍के‍भीतर‍ूी‍की‍जानी‍ू।ैं ‍ुभी‍ूजटलों, रेस्ट्तरां, ऑटज‍ाकविॉप, ऄस्ट्पताल, ऄत्याधुजनक‍स्ट्ाास्ट््य‍देखभाल‍केंद्र‍अदद‍कज‍ठजु‍कचरा‍जनपटान‍और‍प्राथजमक‍ ऄपजिष्ट‍िजधन‍की‍्ास्ट्था‍करनी‍ूजगी। vii. 5000‍ागवमीटर‍या‍ऄजधक‍के‍फ्लजर‍एररया‍ााले‍्जि गत‍भूखंड‍म‍ें भूखंड‍के‍भीतर‍इएुएु‍और‍जनरेटर‍की‍ ्ास्ट्था‍करनी‍ूजगी।‍ईन्ू‍ेंजबलल्डग‍प्लान‍की‍मंजूरी‍के‍ुमय‍उजाव‍की‍खपत/ऑजडट‍जमा‍करना‍ूजगा। viii. जूां‍भी‍पार्ककग‍भूखंड/बेुमेंट‍के‍भीतर‍प्रदान‍की‍जाती‍ू‍,और‍ईुका‍दरुु पयजग‍‍‍‍‍दकया‍जाता‍ू,, तज‍प्राजधकरण‍ द्वारा‍ईुका‍जनगमीकरण/ऄजधग्रूण‍दकया‍जा‍ुकता‍ू।, ix. जूां‍भी‍मौजूदा‍्ााुाजयक‍क्षेत्रों‍के‍पुनर्नाकाु‍के‍जलए‍एक‍्ापक‍यजजना‍की‍त,यारी‍करना‍अाश्यक‍ूजता‍ू,, ाू‍कायव‍स्ट्ायं‍पट्टाधारी/माजलकों‍द्वारा‍ुंयुि ‍रूप‍ुे‍िरूु ‍दकया‍जा‍ुकता‍ू‍, और‍ऄनुमजदन‍के‍जलए‍भूजम-स्ट्ाामी‍ एजेंुी/‍यजजना‍प्राजधकरण‍कज‍प्रस्ट्तुत‍दकया‍जा‍ुकता‍ू।, ‍जूां‍भी‍एफएअर‍में‍दकुी‍ाृजद्ध‍कज‍मंजूरी‍दी‍जाती‍ ू,, ाू‍लाभार्नथयों‍ुे‍ईजचत‍प्रभार‍ाुूलने‍के‍ऄ्यधीन‍ूजगा।‍मेरजपॉजलटन‍जुटी‍ुेंटर‍के‍जलए, जाकाु‍ुंबंधी‍ जनयंत्रण‍ऄनुमजददत‍जनयंत्रण‍यजजना‍के‍ऄनुुार‍ूोंगे। x. ्ााुाजयक‍ केंद्रों‍ की‍ एकीकृत‍ यजजनाओं‍ के‍ मामल‍े म,ें भूखंडों‍ का‍ ुमामले न‍ और‍ ईप-जाभाजन‍ ऄनुमत‍ गजतजाजधयां‍के‍जलए‍ऄनुमेय‍दकया‍गया‍ू,, जजनका‍ाणवन‍‍्ााुाजयक‍केंद्रों‍के‍ुंबंजधत‍पदानुक्रम‍की‍ताजलका‍म‍ें ददया‍गया‍ू‍,जज‍ुमय-ुमय‍पर‍ुक्षम‍प्राजधकारी‍द्वारा‍ऄजधुूजचत‍ऄपेजक्षत‍प्रभार‍के‍भुगतान‍के‍ऄ्यधीन‍ूोंगे। कजइ‍ऄन्य‍्ााुाजयक‍केंद्र दकु ान‍एा‍ंजनााु‍भखू डं ‍/‍दकु ान‍भखू डं i) दकु ान-एां-जनााु‍पररुर‍(दकु ान-ुू-जनााु‍भूखंड/दकु ान‍भूखंड)‍जजन्ू‍ें बाद‍म‍ें ुीुी/एलएुुी/ुीएुुी‍के‍ रूप‍म‍ें नाजमत‍दकया‍गया‍ू,,‍(ज,ुादक‍िूरी‍स्ट्थानीय‍जनकायों/जीएनुीटीडी द्वारा‍ऄजधुूजचत‍ुंबंजधत‍क्षेत्रीय‍ जाकाु‍यजजनाओं‍में‍पूल‍े ु‍े ूी‍जचजननत‍दकया/दिावया‍गया‍ू), ‍कज‍जनम्नजलजखत‍ितों‍पर‍स्ट्थानीय‍िॉलपग‍ुेंटर‍ में‍गजतजाजधयां‍जारी‍रखन‍े की‍ऄनुमजत‍दी‍जाएगी: क. ऐुे‍प्लॉट‍का‍एफएअर‍अााुीय‍जाकाु-प्लॉट‍के‍ुंबंजधत‍अकार‍के‍जलए‍जनधावररत‍दकए‍गए‍ऄथाा‍ पट्टा‍जालेख /‍ूस्ट्तांतरण‍जालखे / जबक्री‍जालेख / अांटन‍ितों‍में‍जनधावररत,‍जज‍भी‍ऄजधक‍ूज,‍दकए‍ ऄनुुार‍ूजगा।‍ूालााँदक, यदद‍‍मौजूदा‍भान‍में‍कुल‍एफएअर‍100 ागवमीटर‍ुे‍ऄजधक‍और‍250 ागवमीटर‍तक‍के‍अकार‍के‍प्लॉट‍पर‍ऄनुमेय‍एफएअर‍ु‍े ऄजधक‍ू,, तज‍ऐुे‍ऄजतररि ‍एफएअर‍ (ऄजधकतम‍350 एफएअर‍तक)‍की‍ऄनुमजत‍ुरकार‍के‍ऄनुमजदन‍के‍ऄनुुार‍जनधावररत‍पने लटी‍प्रभार‍ का‍भुगतान‍करन‍े के‍ऄ्यधीन‍दी‍जाएगी।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 187 ख. ऄजतररि ‍एफएअर‍की‍ऄनुमजत‍यथा‍प्रयजज्य‍ऄजतररि ‍एफएअर‍प्रभार‍के‍भगु तान‍करन‍े पर‍दी‍ जाएगी। ग. "अााुीय"‍ुे‍बदलकर‍“्ााुाजयक”‍करने‍के‍जलए‍रूपांतरण‍प्रभार‍का‍भुगतान‍ुरकार‍के‍ऄनुमजदन‍ ुे‍यथाजनधावररत‍ऄनुुार‍दकया‍जाएगा। घ. एलएुुी, ुीएुुी‍और‍दकु ान‍भूखंड‍जज‍पूले‍ु‍े ूी‍्ााुाजयक‍ईपयजग‍क्षेत्र‍के‍तूत‍ूैं, ईन्ू‍ें दकुी‍ भी‍रूपांतरण‍प्रभार‍का‍भगु तान‍नूीं‍करना‍ूजगा। ङ. ईपयुवि ‍श्रणे ी‍के‍तूत‍्ााुाजयक‍प्रजतष्ठानों/दकु ान‍भूखंडों‍म,ें‍जूां‍पूल‍े ुे‍ूी‍स्ट्ाीकृत‍लअे ईट‍ यजजनाओं/पट्टा‍जालेख/ूस्ट्तांतरण‍जालेख/जबक्री‍जालेख‍ुे‍कजइ‍जाचलन‍नूीं‍दकया‍गया‍ू,,‍कज‍दकुी‍भी‍ ऄजतररि ‍प्रभार‍का‍भुगतान‍नूीं‍करना‍ूजगा। ii) ऄन्य‍मौजूदा‍दकु ान-एा-ं जनााु‍भूखंडों‍कज‍भी‍अााुीय‍प्लॉट‍में‍दकए‍गए‍जाकाु‍के‍एफएअर‍के‍ुाथ‍मूल‍ ऄनुमत‍ईपयजग‍जारी‍रखने‍की‍ऄनुमजत‍दी‍जाएगी।‍प्रयजज्य‍प्रभार‍का‍भुगतान‍करने‍के‍बाद‍उपरी‍मंजजलों‍ कज‍्ााुाजयक‍ईपयजग‍में‍पररार्नतत‍दकया‍जा‍ुकता‍ू।, iii) ऐुे‍दकु ान-एां-जनााु‍भूखंडों/पररुरों‍में‍बेुमेंट‍की‍ऄनुमजत‍दी‍जाएगी‍जूां‍जमजश्रत‍ईपयजग‍जाजनयमों‍के‍ तूत‍प्राुंजगक‍प्रााधानों‍के‍ऄ्याधीन,‍बाद‍में‍ुीुी/‍एलएुुी/ुीएुुी‍के‍रूप‍में‍नाजमत‍दकया‍गया‍ूज।‍ यदद‍बेुमेंट‍के‍आु‍तरू‍के‍ईपयजग‍ुे‍भूखंड‍पर‍ऄनुमेय‍एफएअर‍ऄजधक‍ूज‍जाता‍ू,, तज‍आु‍तरू‍का‍ ऄजतररि ‍एफएअर‍ुरकार‍के‍ऄनुमजदन‍ुे‍जनधावररत‍प्रयजज्य‍प्रभार‍के‍भगु तान‍के‍ऄधीन‍ूोंगे। iv) ईपयुवि ‍ुभी‍मामलों‍म,ें‍माजलक‍दकुी‍भी‍परराधनव ‍/‍पररातवन‍/‍नए‍जनमावण‍/‍रूपांतरण‍के‍जलए‍ुंबंजधत‍ स्ट्थानीय‍जनकाय‍ुे‍जनमावण‍की‍ईप-जाजधयों, ुंरचनात्मक‍ुुरक्षा, ऄजग्न‍ुुरक्षा‍अदद‍के‍प्राुंजगक‍प्रााधानों‍के‍ ुंदभव‍म,ें‍ुभी‍ुांजाजधक‍स्ट्ाीकृजतयों‍के‍ऄ्याधीन‍ुंिजजधत‍जनमावण‍यजजनाओं‍के‍जलए‍ऄनुमजदन‍प्राप्त‍ करेगा। v) पार्ककग‍ुंबंधी‍प्रााधान‍अााुीय‍प्लॉट‍के‍जाकाु-कायव‍के‍जलए‍प्रचजलत‍मानदडं ों‍के‍ऄनुुार‍और‍ताजलका‍ 22.46 में‍जनधावररत‍दकए‍ऄनुुार‍ूोंगे।‍ान-टाआम‍पार्ककग‍प्रभार‍का‍भुगतान‍ुरकार‍के‍ऄनुमजदन‍के‍ ऄनुुार‍जनधावररत‍प्रभार‍के‍भगु तान‍के‍ऄ्याधीन‍या‍तज‍तत्काल‍भगु तान‍के‍रूप‍म‍ें दकया‍जाएगा‍ऄथाा‍ ऄजधकतम‍चार‍दकस्ट्तों‍म‍ेंदकया‍जाएगा। vi) पार्ककग‍ुंबंधी‍अाश्यकताओं‍कज‍पूरा‍करने‍के‍जलए,‍ुंबंजधत‍स्ट्थानीय‍जनकाय ुंबंजधत‍्ापाररयों‍/‍ प्रजतष्ठानों‍/‍अरडब्ल्यूए‍के‍ुाथ‍ुाझा‍/‍कॉमन‍पार्दकगकी‍्ास्ट्था‍करने‍के‍जलए‍भूजम‍की‍पूचान‍और‍ जाकाु-कायव‍करेंगे।‍ुाावजजनक‍पार्ककग‍के‍प्रााधान‍के‍जलए‍यजजना‍क्षेत्र‍के‍भीतर‍5%‍ऄजतररि ‍ग्राईंड‍ कारेज‍की‍ऄनुमजत‍ूजगी। vii) पार्ककग‍कज‍बढ़ााा‍देन‍े के‍जलए, भूखंड‍के‍माजलक‍कज‍कम‍ुे‍कम‍1000‍ाग‍व मीटर‍के‍भूखडं ‍के‍अकार‍के‍ भूखंडों‍कज‍ुमामेजलत‍करन‍े की‍ऄनुमजत‍दी‍जाएगी, तादक‍ुमामेजलत‍भूखडं ‍पर‍ऄजतररि ‍पार्ककग‍ुुजाधा‍दी‍ जा‍ुके।‍ऐुे‍भूखंड‍रूपांतरण‍प्रभार‍में‍50%‍की‍छूट‍के‍ूकदार‍ूोंगे। viii) यदद‍अुपाु‍के‍क्षेत्र‍म‍ें कजइ‍पार्ककग‍ुुजाधा‍ईपलब्ध‍नूीं‍ू,, तज‍ुंबंजधत‍स्ट्थानीय‍जनकाय‍ऐुे‍क्षेत्रों‍कज‍ खरीदारी‍ूते ु‍प,दल‍चलन‍े की‍ुड़कों/क्षेत्रों‍के‍रूप‍म‍ें घजजीत‍कर‍ुकता‍ू।, ‍ुाावजजनक‍परराून‍प्राजधकरण‍ आन‍क्षेत्रों‍के‍जलए‍लास्ट्ट‍माआल‍कनेजक्टजाटी‍की‍ुुजाधा‍ुुजनजित‍करेगा।188 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] घ. ऄनौपचाररक‍क्षत्रे जाजभन्न‍ईपयजग‍जजन‍के‍यजजनाबद्ध‍जाकाु‍में‍िाजमल‍दकए‍जाने‍ााल‍ेऄनौपचाररक‍क्षेत्र‍के‍बाजार‍जनम्नानुुार‍ू:ैं ताजलका‍22.21:‍ऄनौपचाररक‍क्षत्रे ‍की‍्ापार‍आकाआयों‍के‍जलए‍मानदडं क्र.ु.ं ईपयजग‍जजन‍/‍ईपयजग‍पररुर ऄनौपचाररक‍दकु ानों‍(िॉप)‍/‍यजू नटों‍की‍ुख्ं या i) खुदरा‍्ापार: मेरजपॉजलटन‍जुटी‍ुेंटर, जडजस्ट्रक‍ुेंटर, प्रजत‍10‍औपचाररक‍दकु ानों‍के‍जलए‍3‍ु‍े4‍यूजनट‍ (ऄनौपचाररक‍बाजार‍/‍ुर्नाु‍माकेट‍घटकों‍में‍प्रदान‍की‍ कम्‍यजु नटी‍ुेंटर, जाए)ं ुुजाधा‍िॉलपग‍ुेंटर,‍‍ ii) ुरकारी‍और‍्ााुाजयक‍कायावलय प्रजत‍1000 कमवचाररयों‍के‍जलए‍5 ुे‍6 यूजनट‍ iii) थजक‍्ापार‍और‍फ्रेट‍(माल‍भाड़ा)‍पररुर प्रजत‍10‍औपचाररक‍दकु ानों‍के‍जलए‍3‍ु‍े4‍यूजनट ‍ iv) ऄस्ट्पताल‍/‍तृतीयक‍स्ट्ाास्ट््य‍दखे भाल‍केंद्र प्रजत‍100‍बडे ‍के‍जलए‍3‍ुे‍4‍यूजनट v) बु‍टर्नमनल दज‍बु‍बे‍के‍जलए‍1 यूजनट vi) पाकव जडजस्ट्रक‍पाकव प्रत्येक‍मुख्य‍ ‍प्राेि‍पर‍8‍ुे‍10‍यूजनट नेबरुएड‍पाकव‍‍ 2‍ुे‍3‍यूजनट‍ vii) अााुीय 1‍आकाइ‍/‍1000‍अबादी viii) औद्यजजगक प्रजत‍1000 कमवचाररयों‍के‍जलए‍5 ुे‍6 यूजनट ix) रेलाे‍टर्नमनु‍/‍एमअरटीएु‍स्ट्टेिन पररयजजना‍की‍त,यारी‍के‍ुमय‍ुाेक्षण‍पर‍अधाररत‍ ूजना। 22.9.2 थजक, ाेयरूाईलुग क. ईपयजग‍पररुर‍एा‍ंपररभाीाए ाँ ताजलका 22.22 : ईपयजग‍पररुर‍एा‍ंपररभाीा – थजक,‍ाये रूाईलुग क्र.ु.ं ईपयजग‍पररुर पररभाीा 1 थजक एक‍ऐुा‍पररुर‍जूा‍ंुे‍माल‍और‍ास्ट्तुए‍ंखुदरा‍जाक्रेताओं‍कज‍बेची‍ और‍जातररत‍की‍जाती‍ू।ैं ‍पररुर‍में‍भडं ारण‍और‍गजदाम, माल-लदान‍ और‍माल-ईतराइ‍की‍ुुजाधाएं‍िाजमल‍ू।ैं[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 189 2 ाेयरूाईलुग‍/‍भडं ारण‍/‍गजदाम‍/‍ एक‍ऐुा‍पररुर‍जूा‍ं ु‍े माल‍और‍ास्ट्तओंु ‍कज‍ुग्रं जूत‍दकया‍जाता‍ू।, कजल्ड‍स्ट्टजरेज 3 एकीकृत‍फ्रेट‍पररुर‍ क्षेत्रयी‍और‍ऄंत:‍िूरी‍माल‍की‍अााजाूी‍के‍जलए‍और‍िूर‍म‍ें जािेीीकृत‍बाजारों‍के‍ुाथ‍आंटरललक‍की‍ुुजाधाएं‍प्रदान‍करने‍के‍जलए‍ पररुर।‍आु‍पररुर‍म‍ें भडं ारण‍ुुजाधाएं,‍ुर्नालुग,‍माल‍ााूनों‍के‍ जलए‍जनजष्क्रय‍पार्ककग‍और‍ऄन्‍य‍ुंबंध‍कायव‍िाजमल‍ू)ैं ख. ऄनमु ये ‍गजतजाजधया ं ताजलका 22.23 : ईपयजग‍पररुर‍एा‍ंऄनमु त‍गजतजाजधया ं– थजक,‍ाये रूाईलुग क्र.ु.ं ईपयजग‍जजन ुी2 ईपयजग‍पररुर‍ 1 2 3 एकीकृत‍फ्रेट‍ थजक‍/‍ुब‍जुटी‍/‍ ाये रूाईलुग‍/‍भडं ारण‍ ऄनमु त‍गजतजाजधया ं कॉम्प्लक्े ु माकेट /‍गजदाम 1 थजक‍की‍दकु ान‍    2 ाेयरूाईलुग    3 गजदाम‍और‍भडं ारण‍की‍दकु ान ें ग,र-प्रदीू णकारी‍/‍ग,र- खतरनाक‍ुामजग्रयों‍   का‍भंडारण 4 कायावलय    5 ररटेल‍िॉप‍(पुवनल‍ुेाा‍की‍दकु ान‍   ुजूत) 6 रेस्ट्टजरेंट    7 मरम्मत‍/‍ुेाा‍/‍मजटर‍गर, ाज‍और‍    ाकविॉप‍(ऄजधकतम‍10% एफएअर) (4 ु‍े7‍-‍25%‍तक‍एफएअर) 8 र,न‍बुेरा   9 150‍ागवमीटर‍तक‍ुीमा‍चौकी, र,दफक‍पुजलु‍कंरजल‍रूम‍(ऄजधकतम‍   25‍ागवमीटर), फायर‍पजस्ट्ट। 10 फ्यूल‍स्ट्टेिन‍(ईंधन‍स्ट्टेिन)   11 बु‍टर्नमनल   12 बुए-स्ट्तरीय‍पार्ककग   13 बैंक  190 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 14 एटीएम    ग. जाकाु‍जनयत्रं ण‍मानदडं ताजलका‍22.24‍थजक, ाये रूाईलुग क्र.ु.ं ईपयजग‍जजन ु.ं न्यनू तम‍प्लॉट‍ ऄजधकतम‍ एफएअर मागाजव धकार उाँचाइ # क्षत्रे ‍(ागमव ीटर)‍/‍ ग्राईंड‍कारेज (मी.)‍ यजू नट (न्यनू तम)‍ (ऄजधकतम) 1 एकीकृत‍फ्रेट‍ अाश्यकता‍ एनअर 40% 100 30 कॉम्प्लक्े ु‍ ऄनुुार‍ 2 थजक एनअर 8‍ूक्े टेयर‍ 40% 100 30 3 ाये रूाईलुग‍/‍ गजदाम‍/‍भडं ारण‍/‍ कजल्ड‍स्ट्टजरेज 500‍तक 70 140 18 15 501-2000 60 120 18 15 2001-10000 50 100 18 15 10,000‍ुे‍उपर 40 80 24 15 ऄन्य‍लाग‍ूित:ें ‍ जाजनर्ददष्ट‍मानदंडों‍के‍ऄजतररि , ुभी‍भूखंडों/एकीकृत‍यजजनाओं‍पर‍जनम्नजलजखत‍ित‍ेंलाग‍ूूोंगी: i. 30‍मी.‍मागावजधकार‍ुे‍ुीधी‍पुएचं ‍ााले‍1‍ूक्े ट‍े‍और‍ईुुे‍ऄजतधक‍अकार‍के‍प्‍लॉटों‍पर‍जबग-बॉक्ु‍ ‍ररटेल‍के‍रूप‍म‍ें ाेयरूाउु‍जाकजुत‍दकए‍जा‍ुकते‍ू।ैं ‍ऐु‍े प्‍लॉटों‍पर‍ुरकार‍द्वारा‍ुमय‍ुमय‍पर‍यथाजनधावररत‍‍प्रभारोंकका‍ भुगतान‍करन‍े पर‍ऄनुमेय‍एफ‍ए‍अर‍के‍50%‍तक‍म‍ेंररटेल‍कायव‍करने‍की‍ऄनुमजत‍ूजगी।‍‍ ii. जन-ईपयजगी‍ुेााए,ाँ ुाावजजनक‍ुुजाधाएं‍अाश्यकतानुुार‍प्रदान‍की‍जाएंगी। iii. उाँचाइ‍का‍जनधावरण‍भारतीय‍जामानपिन‍प्राजधकरण, एएुअइ, ददल्ली‍ऄजग्न‍िमन‍ुेाा‍(डीएफएु), ऄन्य‍ुंबंजधत‍ प्राजधकरण‍और‍ुांजाजधक‍जनकायों‍ुे‍प्राप्त‍मंजूरी‍के‍ऄ्यधीन‍ूजगा। iv. परराून‍जाकाु‍जनयंत्रण‍मानदंडों‍के‍ऄनुुार‍न्यनू तम‍पार्ककग‍जनधावररत‍की‍जाएगी। जूां‍कूीं‍पार्ककग‍भूखंड/बेुमेंट‍ के‍भीतर‍प्रदान‍की‍जाती‍ू‍, और‍ईुका‍दरुु पयजग‍दकया‍जाता‍ू,, तज‍ाूां‍प्राजधकरण‍द्वारा‍ईुका‍जनगमीकरण / ऄजधग्रूण‍दकया‍जा‍ुकता‍ू।, 300‍ाग‍व मीटर‍ुे‍कम‍अकार‍के‍भूखंडों‍के‍मामले‍म‍ें कॉमन‍पार्दकग‍ुुजाधा‍दी‍जा‍ ुकती‍ू।, v. स्ट्ट,क‍पार्ककग‍के‍जलए‍5%‍ऄजतररि ‍ग्राईंड‍कारेज‍प्रदान‍दकया‍जाएगा। vi. 500‍ागव‍मीटर‍और‍आुुे‍ऄजधक‍अकार‍के‍भूखंडों‍के‍मामले‍में,‍इ.एु.एु, भूजमगत‍जल‍भंडारण‍टैंक, छत‍पर‍जल‍ ुंचयन‍प्रणाली, ऄलग-ऄलग‍ुूखे‍और‍गील‍े डस्ट्टजबन, ुौर‍ूीरटग/‍प्रकाि‍्ास्ट्था‍अदद‍ज,ुी‍जन-ईपयजगी‍ुेााए‍ं भूखंड‍के‍भीतर‍प्रदान‍की‍जाएगं ी।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 191 vii. ऄजतररि ‍एफएअर‍प्रभार, रूपांतरण‍प्रभार, एफएअर‍प्रभार, बेटरमेंट‍लेाी‍और‍ऄन्य‍प्रभार‍ुमय-ुमय‍पर‍ुरकार‍ द्वारा‍यथा-ऄनुमजददत‍अधार‍पर‍लगाए‍जाएंगे। viii. ‍व्‍यजि गत‍भूखंड‍जज‍दकुी‍जास्ट्तृत‍/‍एकीकृत‍जाकाु‍यजजना‍का‍भाग‍नूीं‍ू‍, के‍मामले‍में‍जाकाु‍जनयंत्रण‍पूले‍ु‍े ऄनुमजददत‍यजजना/लेअईट‍प्लान‍के‍ऄनुुार‍ूजगा। 22.9.3 ूजटल‍(ुी3) क. ईपयजग‍पररुर‍-‍पररभाीा ताजलका 22.25 : ईपयजग‍पररुर‍एा‍ंपररभाीा – ूजटल क्र.ु.ं ईपयजग‍पररुर पररभाीा # 1 ूजटल ऐुा‍पररुर‍जूां‍ऄल्प/दीघवकाजलक‍अधार‍पर‍कम‍ुे‍कम‍10‍्जि यों‍के‍ठूरन‍े के‍ जलए‍कमरे‍और‍15‍या‍ईुुे‍अजधक‍्जि यों‍के‍भजजन‍की‍्ास्ट्था‍ूज।‍आु‍पररुर‍ म‍ें बैंक्वेट‍ (भजज-कक्ष), कॉन्फ्रेंलुग‍ ुुजाधाएं, जस्ट्ालमग‍ पलू , ूल्े थ‍ क्लब, जडस्ट्कजथेक‍ िाजमल‍ूज‍ुकत‍े ू।ैं ूजटल‍धरजूर‍ागीकरण‍ााला‍ूज‍और‍ईनका‍ागीकरण‍‍3‍स्ट्टार‍ााले‍ूजटल‍ुे‍उंचा‍ ूज। 2 बजट‍ूजटल जमड‍ुेगमेंट‍ूजटल‍(ऄथावत‍्1-3 स्ट्टार) 3 ुर्नाु‍ऄपाटवमेंट ऐुा‍पररुर‍जज‍भजजन‍बनाने‍की‍ुुजाधा‍के‍ुाथ‍परू ी‍तरू‍ुे‍ुुुजज्जत,‍ुर्नाुड (ुेजात)‍और‍स्ट्ात:‍पूण‍व ूज‍तथा‍जजुे ऄल्पकाजलक‍या‍दीघकव ाजलक‍रूप‍ुे‍‍्जि यों, परराार‍या‍कॉपोरेट‍अााु‍के‍जलए‍ईपयजग‍दकया‍जाता‍ू।, ‍पररुर‍म‍ें ुम्मेलन‍ ुुजाधाएं‍और‍कायावलय‍स्ट्थान‍भी‍िाजमल‍ूज‍ुकत‍े ू।ैं 4 मजटल‍ लॉलजग‍और‍जन:‍िुल्‍क‍पार्ककग‍ुुजाधाएं‍प्रदान‍करन‍े ााल‍े पररुर,‍जािेी‍रूप‍ुे‍ुड़क‍ के‍दकनारे‍ूजटल‍जजुमें‍बाूरी‍पार्ककग‍क्षेत्र‍ुटे‍कमरे‍ूों।‍‍ ख. ऄनमु ये ‍गजतजाजधया ं ताजलका 22.26 : ईपयजग‍पररुर‍एा‍ंऄनमु त‍गजतजाजधया ं– ूजटल क्र.ु.ं ईपयजग‍जजन ुी3192 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] # ईपयजग‍पररुर 1 2 3 ूजटल बजट‍ूजटल ुर्नाु‍ऄपाटमव टें ऄनमु त‍गजतजाजधया ं 1. ुर्नाु‍ऄपाटवमेंट    2. ऄजतजथ‍कक्ष    3. ऄजतजथ‍ुुआट    4. बैंक्वेट  5. ुम्मेलन‍ुुजाधा 6. रेस्ट्टजरेंट    7. जस्ट्ालमग‍पलू   8. ूल्े थ‍क्लब  9. फूड‍कजटव‍  10. जडस्ट्कजथेक‍  11. कायावलय    12. खुदरा‍और‍ुर्नाु‍िॉप‍  13. भजजन‍और‍ुंबंजधत‍ुुजाधाए ं   14. ाॉच‍एंड‍ााड‍व    (20‍ागवमीटर‍तक) ग. जाकाु‍जनयत्रं ण‍मानदडं ताजलका 22.27 : ूजटल क्र. ईपयजग‍जजन‍ ु.ं न्यनू तम‍ प्लॉट‍ ऄजधकतम‍ एफएअर मागाजव धकार उाँचाइ ु.ं क्षत्रे ‍(ागमव ीटर)‍ ग्राईंड‍कारेज (मी.)‍ # /‍यजू नट (न्यनू तम) 1 ूजटल –‍ 40% क.‍30‍मी.‍ 12‍मी. एनअर मागावजधकार‍ुे‍ (ूजटल‍ -‍ कम‍-‍325 भूखंडों‍ ुजूत) ख.‍30‍मी.‍और‍ ईुुे‍उपर‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 193 मागावजधकार‍- 375 2 बजट‍ूजटल 1200 100 3 ुर्नाु‍ 200 30% 225 18‍मी. एनअर ऄपाटवमेंट‍ ईपयुवक्‍त‍(1,‍2‍और‍3‍के‍जलए)‍ऄन्य‍जनयंत्रण i) एफएअर‍का‍ऄजधकतम‍20% ्ााुाजयक‍कायावलयों, खुदरा‍और‍ुेाा‍दकु ानों‍के‍जलए‍ईपयजग‍दकया‍जा‍ ुकता‍ू।, 3 मजटल - 40% 175 30 एनअर i. ऄजधकतम‍175‍एफएअर,‍भारत‍ुरकार‍की‍ऄजधुूचना‍का.अ.‍550 (ऄ)‍ददनांक‍16-06-1995‍तथा‍ भारत‍ुरकार,‍िूरी‍जाकाु‍मंत्रालय‍द्वारा‍04-03-2002‍कज‍जारी‍मजटल‍ददिाजनदेिों‍के‍ऄनुरूप‍ 07-02-2007‍की‍जस्ट्थजत‍के‍ऄनुुार‍ुस्ट्ं ाीकृत‍यजजना‍म‍ेंबताए‍गए‍भूखंड‍क्षेत्र‍पर‍ऄनुमेय‍ूजगा। ii. स्ट्थल‍पर‍ार्नधत‍एफएअर‍ूाजुल‍करन‍े के‍जलए 40%‍के‍बजाय‍50%‍तक‍ग्राईंड‍कारेज‍ऄनुमेय‍ूजगा, यदद‍भारतीय‍जामानपिन‍प्राजधकरण‍की‍ओर‍ु‍ेउाँचाइ‍ुंबंधी‍कजइ‍प्रजतबंध‍ूज। iii. ऄजतररि ‍एफएअर‍प्रभार,‍रूपान्तरण‍प्रभार, बेटरमेंट‍लेाी/बाूरी‍जाकाु‍प्रभार‍अदद‍ुमय-ुमय‍पर‍ ुरकार‍द्वारा‍तय‍दकए‍ऄनुुार‍लगाए‍जाएंगे। iv. मजटल‍के‍ुामने‍कम‍ुे‍कम‍30‍मीटर‍का‍मागावजधकार‍ूजगा‍(यदद‍ुड़क‍कज‍चौड़ा‍करने‍के‍जलए‍ ऄजतररि ‍भूजम‍की‍अाश्यकता‍ूजती‍ू,, तज‍आुे‍मजटल‍क्षेत्र‍ुे‍बाूर‍ुुरजक्षत‍रखा‍जाना‍चाजूए)। v. ऄन्य‍मानदडं ‍और‍ऄनुमेय‍गजतजाजधयां‍ाूी‍ूोंगे‍जज‍ूजटल‍के‍ईपयजग‍पररुर‍पर‍लाग‍ू ू।ैं vi. पानी, जबजली‍की‍अपूर्नत, ुीारेज, जल-जनकाुी, र,दफक‍की‍अााजाूी, पयावप्त‍मागावजधकार‍ााली‍ ुड़क‍कज‍जजड़ने‍का‍प्रााधान‍और‍आु‍तरू‍की‍ऄन्य‍बुजनयादी‍ुुजाधाएं‍माजलक‍द्वारा‍ऄपने‍स्ट्ाय‍ं के‍ खचव‍पर‍तब‍तक‍प्रदान‍की‍जाएंगी‍जब‍तक‍दक‍ईन्ू‍ें ुेाा‍प्रदान‍करने‍ााली‍एजेंजुयों‍द्वारा‍ईपलब्ध‍ नूीं‍करायी‍जाती‍ू।, ‍मजटल‍माजलक‍कज‍ुंबंजधत‍एजेंजुयों‍द्वारा‍की‍गइ‍मागं ‍के‍ऄनुुार‍पयावप्त‍ मागावजधकार‍की‍ुड़क‍कज‍जजड़ने‍की‍्ास्ट्था‍करने‍के‍ुाथ-ुाथ‍बाूरी‍जाकाु‍प्रभार‍का‍भुगतान‍भी‍ करना‍ूजगा। ऄन्य‍लाग‍ूित:ें जाजनर्ददष्ट‍मानदंडों‍के‍ऄजतररि , ुभी‍्ााुाजयक‍भूखंडों/एकीकृत‍यजजनाओं‍पर‍जनम्नजलजखत‍ित‍ें लागू‍ूोंगी: i. जन-ईपयजगी‍ुेााएाँ, ुाावजजनक‍ुुजाधाएं‍अाश्यकतानुुार‍प्रदान‍की‍जाएंगी। ii. ऄजतररि ‍एफएअर‍प्रभार, रूपांतरण‍प्रभार, एफएअर‍प्रभार, बेटरमेंट‍लेाी‍और‍ऄन्य‍प्रभार‍ुमय-ुमय‍पर‍ ुरकार‍द्वारा‍ऄनुमजददत/जनधावररत/ ऄजधुूजचत‍दकए‍ऄनुुार‍लगाए‍जाएंगे। iii. एररऄम‍के‍जलए‍ऄजधकतम‍10%‍ऄजतररि ‍ग्राईंड‍कारेज‍की‍ऄनुमजत‍दी‍जाएगी। यदद‍एररयम‍के‍जलए‍ऄनुमये ‍ ऄजतररि ‍ग्राईंड‍कारेज‍का‍ईपयजग‍दकया‍जाता‍ू,, तज‍ईपयजग‍दकए‍गए‍ग्राईंड‍कारेज‍का‍25%‍एफएअर‍में‍जगना‍ जाएगा। iv. ऄजतररि ‍एफएअर‍का‍लाभ‍ईठाने‍के‍जलए,‍भान-जनमावण‍यजजना‍म‍ें ुंिजधन‍के‍मामले‍म,ें ूजटल‍ऄजतररि ‍ एफएअर‍का‍लाभ‍तभी‍ईठा‍ुकता‍ू,, जब‍भूखंड‍के‍भीतर‍पयावप्त‍पार्ककग‍की‍्ास्ट्था‍ूज। v. 30‍मी.‍मागावजधकार‍(मागावजधकार)‍ु‍े कम‍पर‍325‍एफएअर मानदंड‍ऄथाा‍30‍मी.‍मागावजधकार‍(मागावजधकार)‍ या‍ईु‍ुे‍ऄजधक‍पर‍375‍एफएअर मानदंड‍और‍40%‍ग्राईंड‍कारेज‍आन‍ुब‍पर‍लागू‍ूजगा194 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] क. ूजटलों‍पर‍जजनमें‍्ााुाजयक‍केंद्र,‍कम्‍यजु नटी‍ुेंटर, जडजस्ट्रक‍ुेंटर/ईप-केंद्रीय‍्ापार‍जजला/ईप-नगर‍स्ट्तर‍ के‍्ााुाजयक‍क्षेत्र‍और‍मेरजपॉजलटन‍जुटी‍ुेंटर/ुेंरल‍जबजनेु‍जडजस्ट्रक्ट, एलबीजेड‍क्षत्रे ‍में‍जस्ट्थत‍कज‍ छजड़कर, जुजाल‍लाआंु‍बगं ला‍क्षेत्र‍और‍धरजूर‍ुंरचनाओं‍पर‍जस्ट्थत‍ूजटल‍भूखंड‍िाजमल‍ू‍ैंऔर ख. ूजटल-एा-ं ्ााुाजयक‍भूखंड। यू‍ूजटलों‍की‍ुभी‍श्रेजणयों‍के‍जलए‍लागू‍ूजगा।‍्ााुाजयक‍केन्द्रों‍और‍मेरजपजजलटन‍जुटी‍ुेंटरों‍/ुेंरल‍जबजनुे ‍ जडजस्ट्रक्ट‍के‍ुाथ‍ुाथ‍ूजटल‍एां‍्ााुाजयक‍भूखंडों‍के‍जलए‍एफएअर,‍जूां‍एफएअर‍का‍ऄनुपात‍मलू ‍पट्टा‍ििों‍ के‍ऄनुुार‍ूजगा‍और‍यदद‍आु‍प्रयजजन‍के‍जलए‍एफएअर‍ईपलब्‍ध‍नूीं‍ू,, तज‍यू‍स्ट्ातः‍ूी‍ईु‍ुीमा‍तक‍बढ़‍ जाएगा। vi. ऐुे‍ूजटलों‍के‍ुंबंध‍में‍जूां‍भान-जनमाणव ‍यजजनाएं‍27.1.2006‍ुे‍पूल‍े मंजूर‍की‍गइ‍ू,ैं ाूााँ‍100‍ागव‍मीटर‍के‍ फ्लजर‍एररया‍के‍जलए‍3‍इुीएु‍का‍पार्ककग‍मानक‍केाल‍ऄजतररि ‍एफएअर‍ूते ‍ु लाग‍ू ूजगा, जजुे‍दद.म.ुयज.‍-2021‍ में‍ुंिजधन‍के‍पररणामस्ट्ारूप‍प्राप्त‍दकया‍जाएगा।‍ऐुे‍ूजटलों‍के‍ुंबंध‍म‍ें जूा‍ं 27.1.2006‍कज‍या‍ईुके‍बाद‍भान- जनमावण‍यजजनाएं‍मंजूर‍की‍गइ‍ू,ैं ाूााँ‍100‍ागव‍मीटर‍के‍फ्लजर‍एररया‍के‍जलए‍3 इुीएु‍का‍पार्ककग‍मानक‍परू े‍ भूखंड‍पर‍लाग‍ूूजगा। vii. ूजटल‍और‍मजटल‍म‍ें कचरे‍के‍स्ट्थायी‍प्रबंधन‍की‍जजम्मेदारी‍माजलक‍की‍ूजगी‍और‍कुल‍प्रदीू ण‍जडुचाजव‍िन्ू य‍ूजना‍ चाजूए। viii. मजटल‍के‍कचरे‍के‍जनपटान‍म‍ें अधुजनक‍तकनीकों‍कज‍ऄपनाना‍ूजगा‍ऄथावत‍ठजु‍ऄपजिष्ट‍का‍खाद-यजग्य‍और‍गर, ‍ खाद-यजग्य‍कचरे‍म‍ें पथृ क्करण‍करना‍खाद‍बनान‍े यजग्य‍कचरे‍कज‍स्ट्थानीय‍खाद‍के‍गड्ढों‍में‍जमा‍दकया‍जाना‍चाजूए; खाद‍न‍बनाए‍जा‍ुकने‍ााल‍े कचरे‍कज‍प्रदीू ण‍जनयंत्रण‍मानदडं ों‍के‍ऄ्यधीन‍मजटल‍द्वारा‍बनाए‍गए‍आंुीनेटर‍म‍ें नष्ट‍ दकया‍जाना‍चाजूए। ix. ुंिजजधत‍भान-जनमावण‍यजजनाएं,‍भान‍जनमावण‍ईप-जाजधयों‍के‍तूत‍मंजरू ी‍के‍जलए‍स्ट्थानीय‍जनकायों‍ऄथातव ‍ ुंबंजधत‍नगर‍जनकाय/ददजाप्रा‍कज,‍ज,ुा‍भी‍मामला‍ूज,‍प्रस्ट्ततु ‍की‍जाएंगी। x. उाँचाइ‍का‍जनधावरण‍भारतीय‍जामानपिन‍प्राजधकरण, एएुअइ, ददल्ली‍ऄजग्न‍िमन‍ुेाा‍(डीएफएु), ऄन्य‍ुंबंजधत‍ प्राजधकरण‍और‍ुांजाजधक‍जनकायों‍ुे‍मंजूरी‍के‍ऄ्यधीन‍ूजगा। xi. खंड 22.12.1 के‍ऄनुुार‍न्यूनतम‍पार्ककग‍कज‍जचजन्ूत‍दकया‍जाएगा।‍जूां‍कूीं‍भी‍पार्ककग‍भूखंड/बेुमेंट‍के‍भीतर‍ प्रदान‍की‍जाती‍ू‍, और‍ईुका‍दरुु पयजग‍दकया‍जाता‍ू,, तज‍प्राजधकरण‍द्वारा‍ईुका‍जनगमीकरण/‍ऄजधग्रूण‍दकया‍जा‍ ुकता‍ू।, 22.10 ईद्यजग 22.10.1 यजजनाबद्ध‍औद्यजजगक‍क्षत्रे क. ईपयजग‍पररुर‍एा‍ंपररभाीा ताजलका 22.28 : ईपयजग‍पररुर‍एा‍ंपररभाीा – ईद्यजग क्र.ु.ं ईपयजग‍पररुर‍ पररभाीा # 1. औद्यजजगक‍भूखंड औद्यजजगक‍गजतजाजधयों‍का‍पररुर‍ऐुा‍पररुर‍ू‍, जूा‍ं जजजखमरजूत,‍प्रदीू णरजूत‍गजतजाजधयां‍की‍जाती‍ू।,[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 195 2. औद्यजजगक‍फ्ल,टेड छजटे‍औद्यजजगक‍एककों‍के‍ुमूू‍का‍पररुर‍जूां‍प्रदीू णरजूत‍स्ट्ारूप‍ की‍ुामान्य‍ुेााएं‍और‍ुुजाधाएं‍दी‍जाती‍ू।ैं 3. एकीकृत‍औद्यजजगक‍क्षत्रे ‍/‍यजजना औद्यजजगक‍गजतजाजधयां‍का‍पररुर‍जूां‍जजजखमरजूत,‍प्रदीू णरजूत‍ गजतजाजधयां‍दकए‍जाते‍ू।ैं ‍यू‍भूखंड‍या‍फ्ल,ट‍का‍जमक्ु‍ूज‍ुकता‍ ू।, ख. ऄनमु ये ‍गजतजाजधया ं ताजलका 22.29 : ईपयजग‍पररुर‍एा‍ंऄनमु त‍गजतजाजधया ं– ईद्यजग क्र.ु.ं ईपयजग‍जजन एम1 ईपयजग‍पररुर‍ जाजनमाणव ‍/‍ुाे ा‍ईद्यजग‍/‍ुाे ा‍और‍मरम्मत भूखंड फ्ल,ट 50 50 ुे‍ 400‍ु‍े 2000 ु‍े न्यूनतम‍ 2000 ागव‍ 20,000‍ ागव‍ उपर - उपर - उपर‍ाग‍व 400 ुे - मीटर‍ु‍े ागव‍मी.‍ ऄनमु त‍गजतजाजधया ं मीटर‍ 400 2000 मीटर‍तक‍ 2000 तक उपर‍-‍ ुे‍उपर तक। ागव‍ ागव‍ ागव‍मीटर 20,000 मीटर‍ मीटर‍ तक तक‍ 1 खुदरा‍दकु ान‍/‍मरम्मत‍की‍    दकु ान‍/‍कार्नमक‍ुेाा‍की‍ दकु ान 2 कैंटीन    3 औद्यजजगक‍गजतजाजध‍ुे‍       ुंबंजधत‍ाेयरूाईु‍/‍ भंडारण‍/‍गजदाम:‍ऄजधकतम‍ 10%‍एफएअर‍तक 4 कायावलय  5 ाॉच‍और‍ााडव‍जनााु‍(20‍       ागव‍मीटर) 6 रीटमेंट‍प्लांट, इ.एु.एु.      7 स्ट्टॉक‍/‍श्रजमकों‍के‍जलए‍    अााुीय:‍एफएअर‍का‍196 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ऄजधकतम‍10%‍तक 8 अर‍एंड‍डी‍ुुजाधाए ं    9 आन्क्यूबेिन‍केंद्र‍/‍ुू-कायव      ग. जाकाु‍जनयत्रं ण‍मानदडं ताजलका 22.30 : ईद्यजग क्र.ु.ं ईपयजग‍जजन एम1 ईपयजग‍पररुर भखू डं ‍क्षत्रे ग्राईंड‍कारेज #एफएअर मागाजव धकार‍(मी.) उाँचाइ (न्यूनतम) (ऄजधकतम) (न्यूनतम) (मी.) 1. 50‍ुे‍उपर‍ 100 200 9 8 ागवमीटर‍तक 50‍ुे‍400‍ 100‍ागवमीटर‍ुे‍ ागवमीटर‍ुे‍ नीचे‍के‍भूखंड:‍9 उपर‍ 60 200 15 100 ागव‍मीटर‍ुे‍ उपर‍के‍भूखंड:‍12 औद्यजजगक‍भखू डं 400‍ुे‍ुे‍ उपर 2000‍ 50 200 12 एनअर* ागवमीटर‍तक 2000 2‍ूक्े टेयर‍तकः‍24 2‍ूक्े टेयर‍ु‍ेउपरः‍ ागवमीटर‍ुे‍ 40 200 एनअर* 30 उपर 2. 400-2000 30 200 12 26 2000‍ुे‍ुे‍ एनअर* उपर 20,000 30 200 24 औद्यजजगक‍फ्लट, तक 20,000‍ुे‍ एनअर* 30 200 30 उपर[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 197 *एएअइ‍/‍ऄजग्निमन‍जाभाग‍और‍ऄन्य‍ुांजाजधक‍जनकायों‍ुे‍मंजूरी‍के‍ऄधीन। # ऄजतररि ‍एफएअर‍प्रभार‍ुरकार‍द्वारा‍ुमय-ुमय‍पर‍तय‍दकए‍ऄनुुार‍देय‍ूोंगे। ऄन्य‍जनयत्रं ण: i. ुभी‍ईद्यजगों‍के‍पाु‍ठजु‍कचरे‍के‍जनपटान‍ु‍े पूल‍े ईुे‍ऄलग‍करन‍े का‍प्रााधान‍ूजना‍चाजूए।‍दकुी‍भी‍ ऄनुपचाररत‍बजूस्राा‍कज‍जाुर्नजत‍करन‍े की‍ऄनुमजत‍नूीं‍दी‍जाएगी।‍ऄपेक्षानुुार‍बजूस्राा‍का‍प्राथजमक‍ ईपचार‍भूखंड‍स्ट्तर‍पर‍ूी‍दकया‍जाएगा। ii. 60 ागव‍मीटर‍तक‍के‍भूखंडों‍के‍मामले‍में, कॉमन‍पार्दकग‍प्रदान‍की‍जाएगी, जबदक‍60 ागव‍मीटर‍ुे‍उपर‍के‍ भूखंडों‍के‍जलए‍फ्रंट‍ुेटब,क‍(कम‍ुे‍कम‍3 मीटर)‍पार्ककग‍तथा‍माल-लदान‍और‍माल-ईतराइ‍की‍ुुजाधा‍के‍जलए‍ जबना‍चारदीाारी‍के‍ददया‍जाएगा। iii. स्ट्टेक‍पार्ककग‍के‍जलए‍5%‍ऄजतररि ‍ग्राईंड‍कारेज‍प्रदान‍दकया‍जाएगा। iv. 500‍ागव‍मीटर‍और‍ईुुे‍उपर‍अकार‍के‍भूखंडों‍के‍मामले‍में,‍इ.एु.एु, भूजमगत‍जल‍भडं ारण‍टैंक, छत‍पर‍ जल‍ुंचयन‍प्रणाली, ऄलग-ऄलग‍ुूखे‍और‍गीले‍डस्ट्टजबन, ुौर‍ूीरटग /‍प्रकाि‍्ास्ट्था‍अदद‍ज,ुी‍जन- ईपयजगी‍ुेााएं‍भूखंड‍के‍भीतर‍प्रदान‍की‍जाएंगी। v. ुेाा‍केन्द्र‍भूखंड‍पर‍बने‍औद्यजजगक‍क्षेत्र‍के‍मानदडं ों‍के‍ऄनुुार‍जनयजजजत‍दकए‍जाएंगे। vi. ऄजधकतम‍10%‍एफएअर‍का‍ईपयजग‍जाजनमावण‍और‍ुेाा/मरम्मत‍के‍कायावलय‍के‍जलए‍दकया‍जा‍ुकता‍ू।, vii. खुदरा‍दकु ान/मरम्मत‍की‍दकु ान/पुवनल‍ुेाा‍की‍दकु ान/कैंटीन‍-‍ऄजधकतम‍10%‍एफएअर‍‍तक‍500‍ाग‍व मीटर,‍ जज‍भी‍कम‍ूज। viii. औद्यजजगक‍क्षेत्रों‍में‍स्ट्टाट-व ऄप‍और‍आनजाेिन‍क्लस्ट्टुव‍कज‍ुुु ा्य‍बनाने‍के‍जलए,‍औद्यजजगक‍भूखंडों‍पर जबना‍ दकुी‍ईपयजग‍रूपांतरण‍के‍10%‍एफएअर‍तक‍ुू-कायविील‍स्ट्थान‍(कज‍ार्दकग‍स्ट्‍पेु)‍जनर्नमत‍करन‍े की‍ऄनुमजत‍ दी‍जाएगी। ix. कम‍ु‍े कम‍30‍मी.‍मागावजधकार की‍ुड़क‍ुे‍ुीधे‍पुएचं ‍ााल‍ेभूखंडों‍पर‍ाेयरूाईलुग‍की‍ऄनुमजत‍दी‍जाएगी। घ. यजजनाबद्ध‍औद्यजजगक‍क्षत्रे ों‍म‍ेंईपयजग‍रूपान्तरण‍के‍जलए‍ऄनमु ये ‍ईपयजग ताजलका 22.31 : यजजनाबद्ध‍औद्यजजगक‍क्षत्रे ों‍म‍ेंईपयजग‍रूपान्तरण‍के‍जलए‍ऄनमु ये ‍ईपयजग क्र.ुं औद्यजजगक‍क्षत्रे /पनु र्नाकाु‍यजजना‍की‍लअे ईट‍यजजना‍म‍ें ुिं जधन‍के‍जूस्ट्ु‍े के‍ ितों‍के‍ऄधीन . रूप‍म‍ेंऄनमु ये ‍ईपयजग‍पररुर*‍ न्यनू तम‍ न्यनू तम‍प्लॉट‍का‍ मागाजव धका अकार‍(ाग‍वमी.) र‍(मी.) 1 ्ाुाजयक‍ईपयजग क. ्ााुाजयक‍(ूजटल‍/‍जुनप्े लक्े ु‍कज‍छजड़कर) ऄन्य‍जनयत्रं ण ऄनुमत‍गजतजाजध‍भूखडं ‍के‍अकार‍और‍मागावजधकार‍ु‍े ुंबंजधत‍डीुीएन‍के‍ ऄनुुार‍ूजगी।* i. ख. ाये रूाईलुग‍/‍भडं ारण‍/‍गजदाम न्यूनतम‍ 1000 30 ऄन्य‍ित ें ागवमीटर i. औद्यजजगक‍भूखडं ‍में‍गजदाम‍के‍डीुीएम‍के‍ऄनुुार‍रूपान्तरण‍दकया‍जाता‍ ू।, ii. 30‍मीटर‍मागावजधकार‍ुे‍ुीधी‍पुएचं ‍ााले‍1‍ूक्े टेयर‍और‍ईुुे‍ऄजधक‍198 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] अकार‍के‍भूखंडों‍के‍गजदामों‍के‍भंडार‍पर‍ुरकार‍द्वारा‍ुमय-ुमय‍पर‍ यथा‍जनधावररत‍प्रभारों‍का‍‍भगु तान‍करने‍पर‍ऄनुमेय‍एफएअर‍के‍50%‍ तक‍खुदरा‍गजतजाजध‍की‍ऄनुमजत‍ूजगी। iii. माल‍लदान‍करन‍े और‍ईतारन‍े की‍ुभी‍ुुजाधाएं‍भूखंड‍के‍भीतर‍ूी‍प्रदान‍ की‍जाती‍ू।ैं 2 पीएुपी क. जिक्षा‍ुबं धं ी‍ुजु ाधाएं: पीएुपी‍ डीुीएन‍ 24 ऄनुुंधान‍और‍जाकाु‍केंद्र, ुंस्ट्थान, ्ााुाजयक‍प्रजिक्षण‍केंद्र, अइटीअइ‍/‍ द्वारा‍ यथा:‍ जनधावररत‍ भूखण्ड‍ ‍ पॉजलटेदक्नक‍/‍कौिल‍केंद्र, ्ााुाजयक‍/‍प्रजिक्षण‍ुंस्ट्थान, जिक्षक‍प्रजिक्षण‍ के‍ अकार‍ ु‍े ुंस्ट्थान, प्रबंधन‍ुंस्ट्थान, कजलचग‍ुेंटर, ऄन्य‍प्रजिक्षण‍ुंस्ट्थान‍(्ााुाजयक‍ ुंबंजधत‍मानदंड और‍ुजचाीय‍प्रजिक्षण‍केंद्र), जनरल‍कॉलेज, प्रजफेिनल‍कॉलेज, कॉलेज।‍ ऄुली‍ भूजम‍ ईपयजग‍के‍ऄनुुार‍ एफएअर ख. स्ट्ाास्ट््य‍ुजु ाधाएं:‍ पीएुपी‍ डीुीएन‍ 24 ऄस्ट्पताल‍/‍ततृ ीयक‍(टिीएरी)‍स्ट्ाास्ट््य‍दखे भाल‍केंद्र‍(100‍बडे ‍तक) द्वारा‍ यथा:‍ ऄन्य‍ित ें जनधावररत‍ भूखण्ड‍ ‍ मौजूदा‍जाकाु‍जनयंत्रण‍मानदंडों‍के‍भीतर‍भू-खंड‍रूपान्तरण‍आन‍ितों‍के‍ के‍ अकार‍ ु‍े ऄ्‍यधीन‍ू‍, दक‍एक‍भूखंड‍पर‍बनाए‍जान‍े ााले‍बड्े ु‍की‍ुखं ्‍‍या‍की‍प्रजत‍बेड‍ ुंबंजधत‍मानदंड ुकल‍फ्लजर‍एररया‍{@ 80‍ागवमीटर}‍के‍ऄनुुार‍दकया‍जाएगा।‍ एफ‍ए‍अर‍मूल‍भूजम‍ईपयजग‍के‍ऄनुुार‍लागू‍ू।, ‍ ग. बक्वैं ेट‍ूॉल‍ 800 24 ऄजग्निमन‍मानदंड‍जज‍जनधावररत‍दकए‍गए‍ूों,‍ुजूत‍जाजनदेिन/‍जाजनयमों‍के‍ ऄ्‍यधीन। 1.‍बैंक्ा‍ ेट‍प्ल‍ ॉट‍का‍डी‍ुी‍एन‍लाग‍ूूजगा।‍ 2.‍ुंजाजधत‍ईपयजग‍का‍डी‍ुी‍एन‍लागू‍ूजगा।‍ घ. रेस्ट्तरां, मनजरंजन‍क्लब, छात्राााु‍और‍ाृद्धाश्रम, ुामुदाजयक‍और‍मनजरंजन‍ ऄुली‍भूजम‍ईपयजग‍के‍ डीुीएन‍द्वारा‍यथा‍जनधावररत‍ ूॉल, नर्मुग‍ूजम‍और‍स्ट्ाास्ट््य‍केंद्र‍कज‍औद्यजजगक‍क्षत्रे ‍के‍लअे ईट‍प्लान‍म‍ें मानदंड ुंिजधन‍के‍जूस्ट्ु‍ेके‍रूप‍म‍ेंऄनमु जत‍दी‍जाती‍ू।, ‍ 3 ग्रपु ‍ूाईलुग क. ग्रपु ‍ूाईलुग‍ 3000 24 i. ग्रुप‍ूाउलुग‍के‍ऄनुमेय‍एफएअर‍के‍1.5‍गनु ा‍एफएअर‍के‍प्रजत्ुाून‍के‍ुाथ‍ग्रुप‍ूाउलुग‍के‍जाकाु‍जनयंत्रण‍ मानदंडों‍के‍भीतर‍भ-ू प्रयजग‍रूपान्तरण‍के‍जलए‍पात्र‍ू।, ii. अााुीय‍अबादी‍के‍जलए‍ऄजधमानत‍अाश्यक‍्ााुाजयक‍और‍पीएुपी‍गजतजाजध, और‍ऄनुमेय‍एफएअर‍ के‍15%‍तक‍तक‍कायव‍स्ट्थल‍की‍ऄनुमजत‍दी‍जाएगी। ऄन्य‍जनयत्रं ण: i. एएअइ‍(भारतीय‍जामान‍पिन‍प्राजधकरण), ददल्ली‍ऄजग्निमन‍ुेाा‍(डीएफएु)‍और‍ऄन्य‍ुांजाजधक‍जनकायों‍ुे‍ मंजूरी‍के‍ऄ्‍यधीन‍उाँचाइ‍पर‍कजइ‍प्रजतबंध‍नूीं‍ूजगा।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 199 ii. औद्यजजगक‍ईपयजग‍ुमय-ुमय‍पर‍ुरकार‍द्वारा‍यथा‍जनधावररत‍ातवमान‍बाजार‍मल्ू य‍और‍पार्ककग‍की‍लागत‍के‍ अधार‍पर‍अकजलत‍भ-ू प्रयजग‍रूपान्तरण‍प्रभार‍के‍भुगतान‍के‍ऄ्‍यधीन‍मौजूदा‍जाकाु‍जनयंत्रण‍मानदडं ों‍के‍ भीतर‍ऄन्य‍ईपयजगों‍के‍जलए‍भप्रू यजग‍रूपान्तरण‍के‍पात्र‍ूोंगे। iii. मौजूदा‍क्षेत्रों‍में‍बड़े‍औद्यजजगक‍भूखंडों‍का‍ईप-जाभाजन‍या‍औद्यजजगक‍भूखंडों‍के‍अमले न‍और‍ुाथ‍ूी‍आन‍ औद्यजजगक‍भूखंडों‍पर‍ऄनुमजददत‍यजजनाओं/लअे ईट/‍भान‍यजजनाओं‍की‍ऄनुमजत‍दी‍जाएगी। iv. ऄाुंरचनागत‍ुेााओं‍पर‍ऄजतररि ‍बजझ‍कम‍करन‍े के‍जलए‍ऄजधमानत:‍पनु ः‍ईपयजग‍के‍जलए‍ाीाव‍जल‍ुंग्रूण‍ के‍ुाथ‍ाीाव‍जल‍ुंचयन, एुटीपी, दजूरी‍पाआलपग‍प्रणाली, ुौर‍पीाी‍के‍ईपयजग‍का‍प्रााधान‍दकया‍जाएगा। v. आन‍प्रााधानों‍की‍ितों‍कज‍गर, ‍ऄनुरूप‍/‍जाजनयजमत‍औद्यजजगक‍क्लस्ट्टर‍पर‍प्रयजग‍करने‍की‍ऄनुमजत‍नूीं‍दी‍ जाएगी। vi. ईपरजि ‍प्रााधानों‍का‍दकुी‍भी‍रूप‍म‍ेंुंबंजधत‍ुाोच्च‍न्यायालय‍के‍अदिे ों‍पर‍प्रभाा‍नूीं‍पूगे ा।‍ vii. औद्यजजगक‍क्षेत्रों‍के‍पुनरुद्धार‍के‍जलए, न्यूनतम‍4‍ूक्े ट‍ेयर‍की‍पुनरुद्धार‍यजजना‍त,यार‍की‍जाएगी‍जूा‍ं पुनरुद्धार‍ के‍जलए‍पात्र‍भूखडं ‍का‍न्यूनतम‍अकार‍1000‍ागवमीटर‍ूजगा।‍ऐुे‍पनु र्नाकाु‍में‍भूखंड‍के‍अकार‍की‍जनचली‍ ुीमा‍में‍5%‍तक‍की‍छूट‍दी‍जाएगी। viii. औद्यजजगक‍भूखंडों‍के‍पुनर्नाकाु‍में, मौजूदा‍यजजनाबद्ध‍औद्यजजगक‍क्षेत्र‍के‍जलए‍जाजनयमों‍और‍ददिाजनदेिों‍के‍ ुंबंध‍में‍ददनांक‍01.04.2011‍की‍ऄजधुूचना‍एु.ओ.‍683 (इ)‍में‍ऄनुमत‍एफएअर‍का‍1.5‍गुना‍पूले‍ूी‍ ऄजधुूजचत‍कर‍जलया‍गया‍ू,,‍ऄत:‍औद्यजजगक‍भूखंड‍पर‍ुभी‍ऄनुमेय‍ईपयजगों‍पर‍ऄनुमेय‍एफएअर‍के‍1.5‍गुना‍ की‍ऄनुमजत‍दी‍जाएगी। ङ. जाजभन्न‍ईपयजग‍जजन‍म‍ें औद्यजजगक‍आकाआयों‍के‍जलए‍मानदडं ‍और‍गर, -औद्यजजगक‍ईपयजग‍जजन‍क्षत्रे ों‍म‍ें ईद्यजगों‍के‍ ऄनमु ये ‍पररुरों‍का‍ईपयजग। औद्यजजगक‍ागीकरण‍के‍जलए, ईद्यजगों‍की‍प्रकृजत, क्षेत्र‍और‍औद्यजजगक‍जाकाु‍की‍प्रकृजत‍के‍ऄनुुार‍पर, ामीटर‍की‍ुीमा‍ तय‍की‍जाएगी। ताजलका 22.32 : गर, -औद्यजजगक‍ईपयजग‍जजन‍म‍ेंऔद्यजजगक‍आकाआयों‍के‍जलए‍मानदडं क्र.ु.ं ईपयजग‍पररुर‍ ुमूू ‍की‍ऄनमु जत ित ें (देखें‍ऄनलु ग्नक) श्रजमकों‍की‍ ऄजधकतम‍ ऄजधकतम‍ु.ं‍ औद्यजजगक‍पाार‍ (जबजली)‍लजड‍ (दकलजााट) 1 अााुीय क. प्लॉटेड‍ूाईलुग‍(घरेल‍ूईद्यजग) ऄनलु ग्नक‍5 / (ऄनलु ग्नक‍ 9 11 12) में‍ुूचीबद्ध‍ गजतजाजधयााँ ख. ग्राम‍अबादी ऄनलु ग्नक‍5 में‍ुूचीबद्ध‍ 9 11 गजतजाजधयााँ 2 ्ााुाजयक क. ुुजाधा‍िॉलपग‍ुेंटर, लजकल‍िॉलपग‍ एम1‍(ऄनलु ग्नक‍12) 5 11 ुेंटर200 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ख. कम्‍यजु नटी‍ुेंटर 9 11 ग. जडजस्ट्रक‍ुेंटर 19 11 घ. ुर्नाु‍माकेट, ुर्नाु‍ुेंटर (ऄनलु ग्नक‍12) और‍ -- -- (ऄनलु ग्नक‍13) 3 औद्यजजगक‍ईपयजग क. प्लॉटेड‍जाकाु जनजीद्ध‍और‍ग,र- अाश्यकतानुुार अाश्यकतानुुार प्रदीू णकारी‍और‍ग,र- खतरनाक‍प्रकृजत‍के‍ईद्यजगों‍ कज‍छजड़कर‍ुभी‍ईद्यजग। ख. फ्ल,टेड‍ईद्यजग जनजीद्ध‍और‍ग,र- 2[अाश्यकतानुुार] अाश्यकतानुुार प्रदीू णकारी‍और‍ग,र- खतरनाक‍प्रकृजत‍के‍ईद्यजगों‍ कज‍छजड़कर‍ुभी‍ईद्यजग‍ जजनमें‍िजर/पानी/कंपन‍/गंध‍ प्रदीू ण‍ईत्पन्न‍करनेााल‍े ईद्यजग‍िाजमल‍नूीं‍ू।ैं ऄन्य‍जनयत्रं ण: i. ुक्षम‍प्राजधकारी‍द्वारा‍ुमय-ुमय‍पर‍जारी‍ऄजधुूचना‍के‍ऄनुुार‍ऄजधकतम‍श्रजमक‍ूोंगे। ii. प्रदीू ण‍जनयंत्रण‍ईपकरणों‍के‍प्रचालन‍और‍गर, -जाजनमावण‍ईपयजग‍के‍जलए‍जबजली‍की‍अाश्यकता‍पूाोि ‍ ऄनुमत‍लजड‍के‍ऄजतररक्त‍ ‍ूजगी। 22.10.2 ‍नए‍औद्यजजगक‍क्षत्रे i. ददल्ली‍राष्र‍ीय‍राजधानी‍क्षेत्र‍में‍नइ‍औद्यजजगक‍गजतजाजध‍कज‍ूाइ-टेक‍और‍ुेाा-अधाररत‍ईद्यजगों‍(ऄनलु ग्नक‍ 12) तक‍ुीजमत‍ूजनी‍चाजूए।‍य‍े गजतजाजधयााँ,‍ुंबंजधत‍प्राजधकरण‍/‍स्ट्थानीय‍जनकाय‍द्वारा‍जनधावरत‍दकए‍गए‍ और‍ाुूले‍गए‍ऄाुंरचना‍ईन्नयन‍प्रभारों‍के‍भुगतान‍के‍ऄ्‍यधीन‍मौजूदा‍औद्यजजगक‍क्षेत्रों‍म‍ेंऄनुमेय‍ूोंगी। ii. औद्यजजगक‍ईपयजग‍जजन‍-‍ददिाजनदिे औद्यजजगक‍ईपयजग‍जजन‍का‍ईपयजग‍पररुर‍में‍ईप-जाभाजन‍और‍तदपु रांत‍औद्यजजगक‍ुम्पदा‍के‍जलए‍लअे ईट‍ यजजनाओं‍का‍ऄनुमजदन‍जनम्नजलजखत‍मानदडं ों‍द्वारा‍िाजुत‍ूजगा: क) डीइ‍/‍ददजाप्रा‍जनम्नजलजखत‍जाकल्पों‍के‍अधार‍पर‍लेअईट‍यजजना‍/‍पुनरुद्धार‍यजजना‍त,यार‍करेगा। ताजलका 22.33 : नए‍औद्यजजगक‍क्षत्रे ‍म‍ेंभजू म‍जातरण‍(एकीकृत‍यजजना) ईपयजग‍पररुर‍ भजू म‍का‍प्रजतित औद्यजजगक‍(ाास्ट्तजाक‍क्षेत्र)‍ 50% अााुीय*:‍श्रजमकों‍का‍अााु 20%[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 201 मनजरंजन:‍बफर‍ज़जन, पाकव, ाॉटर‍बॉडीज़, एचटी‍लाआनों‍के‍नीचे‍ग्रीन‍क्षेत्र,‍जजन‍के‍बीच‍अंतररक‍ 7%-10% पक्का‍प,दल‍माग,व ओपन‍एयर‍जथएटर‍अदद। ऄन्य‍ईपयजग‍की‍ऄनमु जत:‍्ााुाजयक 2%-3% िॉलपग‍ुेंटर, ररटेल, प्रदिवनी‍स्ट्थल, गेस्ट्ट‍ूाईु‍/‍बजट‍ूजटल, लॉलजग‍और‍बजर्मडग, ुंचार, ुूचना‍ केंद्र, प्रजिक्षण‍केंद्र, ऄनुुंधान‍एां‍जाकाु‍ुुजाधाएं, रेस्ट्तरा,ं‍पुरूी-मजूला‍ूॉस्ट्‍टल‍अदद। ुामाजजक‍और‍भौजतक‍ुुजाधाएं 6%-8% 1. ुाावजजनक‍और‍ऄध-व ुाावजजनक:‍फायर‍स्ट्टेिन‍/‍फायर‍पजस्ट्ट, पुजलु‍स्ट्टेिन‍/‍पुजलु‍पजस्ट्ट, ऄस्ट्पताल‍/‍ततृ ीयक‍स्ट्ाास्ट््य‍दखे भाल‍केंद्र‍/‍औीधालय, अइटीअइ‍/‍पॉलीटेदक्नक, धमविाला, नाआट‍ िेल्टर, डे‍केयर‍ुेंटर, अदद। 2. ईपयजजगताएाँ:‍आलेजक्रक‍ुब-स्ट्टेिन, ुीइटीपी, पलम्पग‍स्ट्टेिन, भूजमगत‍जल‍ुंचयन‍/‍ऄजग्निमन‍ टैंक‍और‍ऄन्य‍ईपयजजगताएं, अदद‍ठजु‍ऄपजिष्ट‍ुग्रं ू‍केंद्र, जल‍पनु चवक्रण‍ुंयंत्र‍अदद। परराून:‍ुकुवलेिन, पार्ककग, प,दल‍चलन‍े ाालों/ुाआदकल‍ुाारों‍के‍जलए‍रास्ट्ता,‍गुड्ु‍व्ूीकल‍ 15%-18% (मालााूक‍ााून)‍पार्ककग‍फ्यलू ‍स्ट्टेिन‍अदद।‍ कुल 100 *‍ग्रपु ‍ूाउलुग‍के‍जलए‍जाजनयम‍लाग‍ू ूोंगे।‍आु‍अााु‍का‍ईपयजग‍औद्यजजगक‍क्षेत्र‍में‍कायरव त‍कामगारों/‍कमवचाररयों‍के‍ जलए‍दकया‍जाएगा।‍‍ ऄन्य‍जनयत्रंण: ऄफजडेबल‍दकराया‍अााु‍जाकजुत‍करने‍के‍जलए‍औद्यजजगक‍क्षेत्रों‍(1‍ूक्े टेयर‍ुे‍उपर)‍के‍जलए, ऄनुमेय‍अााुीय‍ एफ‍ए‍अर‍का‍15%‍ऄजतररि ‍एफएअर‍का‍ईपयजग‍दकया‍जा‍ुकता‍ू।, i. भूखंड‍के‍भीतर‍भडं ार, 10%‍तक‍ुीजमत‍ूजगा‍और‍ुंबंजधत‍भूखंड‍(कच्‍चा‍माल,‍त,यार‍ईत्पाद, अदद, भंडारण)‍ में‍औद्यजजगक‍गजतजाजध‍ुे‍ईत्पन्न‍अकजस्ट्मक‍भंडारण‍के‍रूप‍म‍ेंप्रदान‍दकया‍जाएगा। ii. पार्ककग‍मानदंड‍खण्ड‍22.12.1‍के‍ऄनुुार‍लाग‍ूदकए‍जाने‍चाजूए। औद्यजजगक‍ईपयजग‍जजन‍के‍जलए‍लअे ईट‍यजजनाओं‍के‍ऄनमु जदन‍के‍जलए‍ऄन्य‍ित:ें i. ुभी‍नए‍औद्यजजगक‍ुंपदा‍/‍क्षत्रे ों‍की‍पुएचं ‍कम‍ुे‍कम‍30‍मीटर‍मागावजधकार‍की‍एक‍ुड़क‍ुे‍ूजगी। ii. ऑटजमजबाआल‍ाॉलिग‍क्षेत्र‍के‍पाु‍ग्रीु‍रेप‍प्रदान‍दकया‍जाना‍चाजूए। iii. नए‍औद्यजजगक‍क्षेत्र,‍बड़ी‍मुख्य‍ ‍मागीय‍ुड़कों‍के‍अुपाु‍ऄाजस्ट्थत‍ूजने‍चाजूए।‍प्रमुख‍ऄाुंरचना‍नेटाकव‍ज,ुे‍ ुीएनजी, एलपीजी, तेल, ऑजप्टकल‍फाआबर, जबजली, अदद‍भूजमगत‍पाआपलाआनों‍के‍मा्यम‍ुे‍आु‍कॉरीडजर‍के‍ ुाथ-ुाथ‍ईपलब्ध‍कराए‍जाए।ं iv. ुीइटीपी, ठजु‍ऄपजिष्ट‍पथृ क्करण/‍िजधन‍ुंयंत्रों‍का‍प्रााधान‍औद्यजजगक‍क्लस्ट्टर‍स्ट्तर‍पर‍दकया‍जाएगा। v. ुंबजं धत‍एजेंुी‍द्वारा‍ुमुजचत‍अपदा‍प्रबधं ‍दकए‍जाएगं े। vi. क्षेत्र‍के‍जलए‍भूदश्ृ ‍यांकन‍यजजना‍त,यार‍की‍जाएगी। vii. ुभी‍ईद्यजगों‍में‍ठजु‍ऄपजिष्ट‍के‍जनपटान‍ुे‍पूले‍ऄलग‍करने‍का‍प्रााधान‍ूजना‍चाजूए।‍इ-कचरे‍के‍प्रबंधन‍के‍ जलए‍प्रााधान‍दकया‍जाना‍चाजूए202 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 22.11‍मनजरंजन क. ईपयजग‍पररुर‍एा‍ंपररभाीाए ाँ ताजलका‍22.34‍ईपयजग‍पररुर‍एा‍ंपररभाीा‍-‍मनजरंजन क्र.ु.ं ईपयजग‍पररुर पररभाीा 1 क्षेत्रीय‍पाकव आु‍क्षेत्र‍में‍ान‍जाभाग‍द्वारा‍ुत्‍यापन‍करने‍के‍ऄधीन‍नादनव,‍ुेंरल,‍ुाईथ‍ुेंरल‍ और‍ुदनव‍ररज‍िाजमल‍ूोंगे। 2 जुटी‍पाकव/जजला‍पाकव पाकव‍प्राकृजतक,‍ऄध-व प्राकृजतक‍क्षेत्र‍ूजता‍ू‍, या‍मनुष्‍यों‍के‍मनजरंजन‍और‍मौज‍ मस्ट्त‍ ी‍के‍जलए‍बनाया‍गया‍क्षत्रे ‍ूजता‍ू।, ‍आुम‍ें ुुरक्षा/ुंरक्षण‍के‍जलए‍जनर्ददष्‍ट‍ /ुामदु ाजयक‍पाकव क्षेत्र‍िाजमल‍ू।, ‍ 3 थीम‍अधाररत‍/‍एम्यूजमेंट‍ एक‍बड़ा‍अईटडजर‍क्षेत्र,‍जज‍अमतौर‍पर मनजरंजन‍प्रयजजनाथव‍ऄन्य‍कायवक्रमों‍के‍ पाकव‍ ुाथ‍ ुाथ‍ राआड,‍ खले ‍ कूद‍ ज,ुे‍ जाजभन्न‍ अकीवणों‍ की‍ जािेीताओं‍ ााल‍े जाीय/जाचार‍पर‍अधाररत‍ूजता‍ू।, 4 बुएईद्देिीय‍म,दान‍ मनजरंजनात्मक‍ुुजाधाओं‍ुे‍यक्ु त‍ ‍बुएत‍ुी‍ुाावजजनक‍गजतजाजधयों‍/ुमारजूों‍के‍ जलए‍एक‍खलु ा‍स्ट्थ‍ ान। 5 पुरातत्ा‍पाकव अर्दकयजलॉजजकल‍पाकव‍एक‍ऐुा‍क्षेत्र‍ू‍, जूां‍पाररजस्ट्थजतक‍रूप‍ु‍े ुंाेदनिील‍ ुंपजि‍के‍ुाथ‍धरजूर‍मूत्‍ा‍की‍जमली-जुली‍ुंपजि‍ूजती‍ू।, 6 ऐजतूाजुक‍स्ट्मारक ऐजतूाजुक‍पररुर,‍जजनकी‍ऐजतूाजुक‍और/या‍ुामाजजक-ुांस्ट्कृजतक‍मूत्ा‍के‍ पररुर‍के‍‍रूप‍म‍ेंपूचान‍की‍गइ‍ू।, 7 ज,ा‍जाजाधता‍पाकव ये‍ऄनठू े‍भ-ू भू‍दश्ृ ‍यांकन‍ााल‍े जािेी‍पाकव‍ू‍ैं जज‍देिी‍ानस्ट्पजतयों‍और‍जीाों‍के‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 203 क्र.ु.ं ईपयजग‍पररुर पररभाीा क्षेत्र‍और‍अश्रय‍के‍जलए‍प्रकृजत‍के‍भंडार‍का‍काम‍करत‍ेू।ैं 8 ग्रीन‍बफर बफुव‍ ग्रीन्ु,‍ जलाियों,‍ प्राकृजतक‍ नालों, एचटी‍ लाआन्ु अदद‍ के‍ अुपाु‍ जाकजुत‍ूररत‍क्षेत्र/‍कॉररडजर‍ूजते‍ू।ैं 9 स्ट्पजट्ुव‍ुेंटर दिवकों‍के‍जलए‍पाेजलयन‍भानों, स्ट्‍टेजडयम‍ुंरचना‍और‍ुबं ंजधत‍ुुजाधाओं‍ु‍े युक्‍त‍अईटडजर‍और‍आनडजर‍खले ों‍के‍जलए‍प्रयक्ु त‍ ‍पररुर। ख. ऄनमु ये ‍गजतजाजधया ं ताजलका‍22.35‍ईपयजग‍पररुर‍और‍ऄनमु त‍गजतजाजधया‍ंक्षत्रे ीय‍पाकव, जुटी‍पाकव, जडजस्ट्रक‍पाकव, ुामदु ाजयक‍पाकव‍और‍ बुएईद्देिीय‍(मल्टी‍परपज़)‍मद, ानः- क्र. ईपयजग‍जजन पी1 पी2 अरडी ु.ं ईपयजग‍ 1 2 3 4 5 6 7 8 9 # पररुर क्षत्रे ीय‍ जुटी‍ जडजस्ट्रक‍ ुामदु ा थीम‍ िूर‍ जजला‍ ुमु स्ट्थानीय‍ पाकव‍* पाकव पाकव जयक‍ अधाररत/‍ दाय स्ट्तर‍के‍ पाकव एम्यज़ू मटें ‍ पाकव बुएईद्देिीय‍मद, ान‍ ऄनमु त‍ पाकव गजतजाजधया ं 1 ान‍/‍ ाुडलड्ैं ु‍(ान‍    प्रदेि) 2 ाॉच‍एंड‍ााड‍व रूम‍(पूरा‍         और‍जनगरानी‍ कक्ष) 3 जपकजनक‍ ूट्ु‍एा‍ं      ग्राईंड्ु 4 ज,ा-जाजाधता‍    पाकव 5 प्राजण‍ईद्यान‍/‍ पक्षी‍  ऄभयारण्य204 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] क्र. ईपयजग‍जजन पी1 पी2 अरडी ु.ं ईपयजग‍ 1 2 3 4 5 6 7 8 9 # पररुर क्षत्रे ीय‍ जुटी‍ जडजस्ट्रक‍ ुामदु ा थीम‍ िूर‍ जजला‍ ुमु स्ट्थानीय‍ पाकव‍* पाकव पाकव जयक‍ अधाररत/‍ दाय स्ट्तर‍के‍ पाकव एम्यज़ू मटें ‍ पाकव बुएईद्देिीय‍मद, ान‍ ऄनमु त‍ पाकव गजतजाजधया ं 6 बॉटेजनकल‍ गाडवन‍/‍    अबोरेटम 7 स्ट्थानीय‍ ुरकारी‍        कायावलय‍ (रखरखाा) 8 ओपन‍एयर‍ जथएटर‍/‍ रंगिाला‍     (एम्फीजथएटर ) 9 िूरटग‍रेंज   10 पुजलु‍पजस्ट्ट‍/‍     फायर‍पजस्ट्ट 11 ऑचवड व     12 प्लांट‍नुवरी    13 राष्ट्रीय‍ स्ट्मारक‍ (क,जबनेट‍/‍   भारत‍ुरकार‍ द्वारा‍ ऄनुमजददत) 14 एक्वा‍पाकव‍/‍ ााटर‍स्ट्पजट्ुव‍    पाकव‍/‍ एक्वेररयम 15 खेलकूद‍ ुंबंधी‍   गजतजाजधयां 16 खेल‍का‍म,दान         17 मनजरंजन‍    क्लब[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 205 क्र. ईपयजग‍जजन पी1 पी2 अरडी ु.ं ईपयजग‍ 1 2 3 4 5 6 7 8 9 # पररुर क्षत्रे ीय‍ जुटी‍ जडजस्ट्रक‍ ुामदु ा थीम‍ िूर‍ जजला‍ ुमु स्ट्थानीय‍ पाकव‍* पाकव पाकव जयक‍ अधाररत/‍ दाय स्ट्तर‍के‍ पाकव एम्यज़ू मटें ‍ पाकव बुएईद्देिीय‍मद, ान‍ ऄनमु त‍ पाकव गजतजाजधया ं 18 ओपन-एयर‍     फूड‍कजट व 19 जचल्ड्रन‍पाकव‍/‍ जचल्ड्रन‍      र,दफक‍पाकव 20 जािेी‍पाकव    21 पुरातत्ा‍पाकव   22 एम्यूज़मेंट‍ पाकव‍/‍थीम‍ पाकव ुाारी‍ (राआड्ु)‍    म,केजनकल‍+‍ ाॉटर‍राआड), खेल, िज, थीम‍प्रदिनव ‍ अदद। 23 ुुख‍ुुजाधा‍ युि ‍         (एमेजनटी)‍ ुंरचना 24 ओपन‍जजम    25 रेस्ट्तरां‍/‍क,फे    26 ाेंलडग‍बथू ‍        /दकयजस्ट्क 27 ुाावजजनक‍ ुभा‍म,दान, ुाावजजनक‍ ुंबजधन‍मंच, ुाावजजनक‍    ुामारजू‍/‍ जाााू‍/‍ ईत्ुा‍पंडाल‍ और‍ऄन्य‍206 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] क्र. ईपयजग‍जजन पी1 पी2 अरडी ु.ं ईपयजग‍ 1 2 3 4 5 6 7 8 9 # पररुर क्षत्रे ीय‍ जुटी‍ जडजस्ट्रक‍ ुामदु ा थीम‍ िूर‍ जजला‍ ुमु स्ट्थानीय‍ पाकव‍* पाकव पाकव जयक‍ अधाररत/‍ दाय स्ट्तर‍के‍ पाकव एम्यज़ू मटें ‍ पाकव बुएईद्देिीय‍मद, ान‍ ऄनमु त‍ पाकव गजतजाजधया ं ुाावजजनक‍ और‍ ुामाजजक‍ ुमारजू‍अदद‍ के‍जलए‍ प्रााधान। 28 खेल‍क्षत्रे      29 ुाावजजनक‍ मेला‍ग्राईंड‍/‍   मेला नजटः *ईच्चतम‍(ुाोच्च)‍न्यायालय‍की‍केंद्रीय‍ऄजधकार‍प्राप्त‍ुजमजत‍और‍राष्र‍ीय‍राजधानी‍क्षेत्र‍ददल्‍ली‍ुरकार‍के‍ररज‍प्रबंधन‍ बजडव‍ुे‍अाश्यक‍मंजूरी‍के‍ऄ्य‍ धीन‍मौजूदा‍फाम‍व ूाईुों‍के‍जनयजमतीकरण‍के‍जलए‍लाग‍ू नीजत‍के‍ऄनुुार‍01.08.90‍ु‍े पूले‍[या‍बाद‍में‍ऄगर‍[ुंबंजधत‍नगर‍जनकाय‍द्वारा‍ऄनुमजददत‍ूों]‍ुस्ट्ं ‍ाीकृत‍दकए‍गए‍ऄनुमजददत‍फामव‍ूाईु, की‍ऄनुमजत‍ ू।, ] ताजलका 22.36 ईपयजग‍पररुर‍और‍ऄनमु त‍गजतजाजधया-ाँ ‍परु ातत्ा‍पाकव, जा, ‍जाजाधता‍पाकव‍और‍ग्रीन‍बफर क्र.ु.ं ईपयजग‍जजन‍ पी3‍ पी4 # ईपयजग‍पररुर 10 11 12 13 ऄनमु त‍गजतजाजधया ं परु ातत्ा‍पाकव ऐजतूाजुक‍ जा, ‍जाजाधता‍ ग्रीन‍बफर स्ट्मारक पाकव 1 ुाावजजनक‍ ईत्ुा‍ /‍ प्रदिवजनया‍ाँ (ऄस्ट्थायी‍   ुंरचनाएाँ) 2 ुाआलक्लग‍और‍ाॉककग‍    र,क्ु 3 आंटरप्रीटेिन‍/‍अगंतुक‍केंद्र‍    (जाजजटर‍ुेंटर)[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 207 क्र.ु.ं ईपयजग‍जजन‍ पी3‍ पी4 # ईपयजग‍पररुर 10 11 12 13 ऄनमु त‍गजतजाजधया ं परु ातत्ा‍पाकव ऐजतूाजुक‍ जा, ‍जाजाधता‍ ग्रीन‍बफर स्ट्मारक पाकव 4 रेस्ट्तरां‍/‍फूड‍कजटव    5 बगीचे‍/‍अबोरेटम,‍ ग्रीनूाईु, बागाानी‍क्लब,    ुामुदाजयक‍ुब्जी‍ईद्यान‍ और‍पौधे‍की‍नुवरी, अदद। 6 जािेी‍पाकव‍(बटरफ्लाइ‍ पाकव, फनेररयम‍अदद)‍/‍  फ़्लजरा‍और‍फौना‍के‍जलए‍ ुुजाधाएं 7 ओपन‍एयर-जथएटर   8 एमेजनटी‍ुंरचनाएं*‍(ुुख‍    ुुजाधाएं) 9 ा,ज्ञाजनक‍प्रयजगिालाए ाँ  10 प्रिाुजनक‍कायावलय    11 जिजार‍स्ट्थल  12 पानी‍अधाररत‍ पाररजस्ट्थजतकी‍के‍जलए‍   ाेटलैंड्ु‍(दलदली‍भूजम)‍ और‍दलदल 13 ुदक्रय‍ुाावजजनक‍ईपयजग; पाकव, यजगा‍स्ट्थान, ुदक्रय‍  खेल‍कूद‍(औपचाररक‍ ुीरटग‍के‍जबना)‍और‍ बजरटग 14 दकयजस्ट्क    नजटः *ुुख-ुुजाधा‍ुंरचनाओं‍में‍प्रुाधन‍ब्लॉक, पंप‍रूम, आलेजक्रक‍रूम, गाडव‍कक्ष,‍भंडार‍कक्ष‍और‍ईपकरण‍कक्ष‍िाजमल‍ू।ैं ‍ स्ट्थानीय‍स्ट्तर‍कज‍छजड़कर‍ये‍ुभी‍पाकों‍में‍ऄनुमेय‍ूोंगे। ताजलका‍22.37‍ईपयजग‍पररुर‍और‍ऄनमु त‍गजतजाजधया-ाँ ‍खले ‍ुजु ाधाए‍ं208 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] क्र.ु.ं ईपयजग‍जजन‍ पी5‍(खले ‍ुजु ाधाएं)‍ अरडी # ईपयजग‍पररुर 14 15 16 17 िूर‍स्ट्तर‍के‍ जजला‍खले ‍केंद्र ुामदु ाजयक‍खले ‍ स्ट्थानीय‍स्ट्तर‍ खले :‍प्रभागीय‍ केंद्र पर‍खले ‍क्षत्रे खले ‍केंद्र ऄनमु त‍गजतजाजधया ाँ 1 मल्टीयजू ‍स्ट्टेजडयम‍  (बठ, न‍ेकी‍क्षमता‍15,000) 2 स्ट्टेजडयम‍    3 एक्वारटक‍ुटें र (काड‍व या‍ऄन्यथा‍पणू ‍व अकार‍ााल‍े प्रजतयजजगता‍पलू , प्रजिक्षण/‍लप, ‍पूल, डाआलाग‍ पलू ‍ जजनका‍ प्रयजग‍ ााटर‍ पजलज‍ और‍ लुक्रजनाआज्ड‍ जस्ट्ालमग‍ के‍  ुाथ-ुाथ‍ ऄन्य‍ जलीय‍ मनजरंजन‍ ुुजाधाओं‍ ज,ुे‍ ाॉटरस्ट्लाआड्ु, ाेा‍ पूल,‍ूाआड्रजथ,रेपी पूल, ऄखाड़ा‍अदद‍ के‍जलए‍भी‍दकया‍जा‍ुकता‍ू।, ) 4 बुएईद्देिीय‍ूॉल‍ (बठ, न‍ेकी‍क्षमता‍4,000) [प्रदिजव नयों,‍्ापार‍कायवक्रमों,‍बैंक्वेट,‍  बुएत‍ुे‍‍ुंबंजधत‍खेल‍और‍ ुामाजजक-ुांस्ट्कृजतक‍कायवक्रमों‍के‍ जलए] 5 खेल‍ुुजाधाएं‍(अईटडजर‍और‍  आनडजर)   6 खेल‍ऄकादमी‍/‍खेल‍प्रजिक्षण‍केंद्र   7 स्ट्पजट्ुव‍जचदकत्ुा‍केंद्र  8 जस्ट्ालमग‍पलू    9 अधाररक‍ुंरचना‍ुूायता; चेंलजग‍  रूम,‍मल्टी‍जजम, अदद‍ज,ुी‍   ुुजाधाओं‍के‍जलए‍‍भडं ारण‍के‍जलए‍ स्ट्थान‍/‍स्ट्थल‍ 10 दकु ान    11 रेस्ट्टजरेंट‍/‍क,फेटेररया    12 बैंक‍एक्ुटेंिन‍(काईंटर)    13 कायावलय‍(जाभागीय)*    14 खेल‍ुंबंधी‍्जि यों‍/‍जखलाजड़यों‍के‍  [भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 209 क्र.ु.ं ईपयजग‍जजन‍ पी5‍(खले ‍ुजु ाधाएं)‍ अरडी # ईपयजग‍पररुर 14 15 16 17 िूर‍स्ट्तर‍के‍ जजला‍खले ‍केंद्र ुामदु ाजयक‍खले ‍ स्ट्थानीय‍स्ट्तर‍ खले :‍प्रभागीय‍ केंद्र पर‍खले ‍क्षत्रे खले ‍केंद्र ऄनमु त‍गजतजाजधया ाँ जलए‍छात्राााु‍/‍अााुीय‍अााु, प्लॉरटग‍ूाईलुग‍(रखरखाा‍और‍ प्रबंधन‍कमवचारी):‍कुल‍एफएअर‍का‍ 5% 15 पुजलु‍पजस्ट्ट, फायर‍पजस्ट्ट, जडजजटल‍    आन्फ्रास्ट्रक्चर‍दकयजस्ट्क 16 जचल्ड्रन’ु‍कॉनवर     17 खेल‍का‍म,दान    18 ाॉच‍एंड‍ााड‍व रेजजडेंु    नजटः *कुल‍एफएअर‍के‍ऄजधकतम‍5%‍के‍जलए‍क्र.‍ु.ं‍10‍ु‍े13‍तक‍की‍ुभी‍गजतजाजधयों‍की‍ऄनमु जत‍ू।, ‍ ग. जाकाु‍जनयत्रं ण‍मानदडं ‍ ताजलका 22.38 मनजरंजन न्यनू तम‍भखू डं ‍ ऄजधकतम‍ न्यनू तम‍ क्र.ु.ं क्षत्रे ग्राईंड‍ उाँचाइ ईपयजग‍पररुर‍ ुख्ं या‍ एफएअर मागाजव धकार‍ # (ाग‍व कारेज (मी.) (मी.) मी.)/यजू नट (%) स्ट्थानीय‍स्ट्तर जनुंख्या‍10000‍तक‍ 1 टॉट‍लॉट 40 125 -- -- -- -- ूाईलुग‍क्षेत्र‍ 2 2 पाकव 5000 -- -- -- -- ूाईलुग‍क्षेत्र‍ 5000 3 खेल‍का‍म,दान 2 -- एनअर* (0.5 ूक्े टेयर) स्ट्थानीय‍स्ट्तर‍पर‍ पाकव 4 1 10,000 -- -- -- -- (1 ूक्े टेयर) स्ट्थानीय‍स्ट्तर‍पर‍ 5000- 5 खेलने‍का‍क्षेत्र 1 2% 4 -- एनअर* 10,000 (0.5210 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ु े 1 ूक्े टेयर) * एएअइ, ऄजग्निमन‍जाभाग‍और‍ऄन्य‍ुांजाजधक‍जनकायों‍ुे‍मंजूरी‍के‍ऄधीन। न्यनू तम‍भखू डं ‍ ऄजधकतम‍ न्यनू तम‍ उाँचाइ क्र.ु.ं ईपयजग‍पररुर‍ ुख्ं या क्षत्रे ग्राईंड‍कारेज एफएअर मागाजव धकार‍ (मी.) (ाग‍वमी.)/यजू नट (%) (मी.) ुामदु ाजयक‍स्ट्तर जनुंख्या‍100,000‍तक ुभी‍प्रकार‍की‍ अााु‍यजग्य‍ 35000 ागव‍ जनर्नमत‍ ुामुदाजयक‍पाकव 1 1 मीटर‍(3.5 --- 18 ुंरचनाओं‍के‍ जलए‍ऄजधकतम‍ ूक्े टेयर) ऄनुमेय‍उाँचाइ‍ 4.8‍मीटर‍ू।, ऄन्य‍जनयत्रं ण: i. पाकव‍में‍ुभी‍ऄनुमेय‍स्ट्थायी‍जनर्नमत‍ुंरचनाएं‍पाकव‍क्षेत्र‍के‍0.5%‍या‍100‍ागव‍मीटर,‍जज‍भी‍कम‍ूज,‍ुे‍ऄजधक‍ नूीं‍ूोंगी। ii. क्षेत्र‍के‍20%‍कज‍ुघन‍ाृक्षारजपण‍के‍रूप‍में‍‍जाकजुत‍दकया‍जाएगा। ुभी‍प्रकार‍की‍ अााु‍यजग्य‍ ुामदु ाजयक‍ 20,000‍ागव‍ जनर्नमत‍ 2 बुएईद्देिीय‍मद, ान 1 मी. (2 एनए*‍ एनए** 18 ुंरचनाओं‍के‍ जलए‍ऄजधकतम‍ ूक्े टेयर)‍ ऄनुमेय‍उाँचाइ‍ 4.8‍मीटर‍ू।, ऄन्य‍जनयत्रं ण: i. * कुल‍क्षेत्रफल‍का‍न्यूनतम‍50%‍ुॉफ्ट‍पार्ककग‍के‍ऄतं गतव ‍ूजगा‍और‍िेी‍50%‍का‍ईपयजग‍गजतजाजधयों‍के‍जलए‍ दकया‍जाएगा। ii. **‍बुएईद्देिीय‍मद, ानों‍के‍भीतर‍ुभी‍स्ट्थायी‍जनर्नमत‍ुरं चनाएं, भूखंड‍क्षेत्र‍के‍1% या‍500‍ाग‍व मीटर,‍जज‍भी‍कम‍ ूज,‍ुे‍ऄजधक‍नूीं‍ूजनी‍चाजूए। ुामदु ाजयक‍खले ‍ 1‍ूक्े टेयर‍ु‍े3‍ 3 1 20% 40 24 एनअर* केंद्र ूक्े टेयर ऄन्य‍जनयत्रं ण: जनम्नजलजखत‍के‍जलए‍ऄजधकतम‍5% एफएअर‍की‍ऄनमु जत‍ू:, i. दकु ान, ii. रेस्ट्टजरेंट, iii. बैंक‍एक्ुटेंिन‍(काईंटर), iv. कायावलय‍(जाभागीय), v. पुजलु‍पजस्ट्ट, फायर‍पजस्ट्ट, vi. जडजजटल‍आन्फ्रास्ट्रक्चर‍दकयजस्ट्क।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 211 न्यनू तम‍भखू डं ‍ ऄजधकतम‍ न्यनू तम‍ उाँचाइ क्र.ु.ं ईपयजग‍पररुर‍ ुख्ं या क्षत्रे ग्राईंड‍कारेज एफएअर मागाजव धकार‍ (मी.) (ाग‍वमी.)/यजू नट (%) (मी.) ुामदु ाजयक‍स्ट्तर जनुंख्या‍100,000‍तक * एएअइ, ऄजग्निमन‍जाभाग‍और‍ऄन्य‍ुांजाजधक‍जनकायों‍ुे‍मंजूरी‍के‍ऄधीन। न्यनू तम‍भखू डं ‍ ऄजधकतम‍ न्यनू तम‍ क्र.ुं उाँचाइ ईपयजग‍पररुर‍ ु.ं क्षत्रे ‍(ाग‍व ग्राईंड‍कारेज एफएअर‍ मागाजव धका . (मी.) मी.)/यजू नट (%) र‍(मी.) ईप-िूर‍स्ट्तर जनुंख्या‍5,00,000 ुभी‍प्रकार‍ की‍अााु‍ यजग्य‍जनर्नमत‍ ुंरचनाओं‍के‍ 2,50,000 ागव‍ जडजस्ट्रक‍पाकव जलए‍ 1 1 मी. एनए** 30 ऄजधकतम‍ (25 ूक्े टेयर) ऄनुमेय‍ उाँचाइ‍4.8‍ मीटर‍ू।, ऄन्य‍जनयत्रं ण: i. जडजस्ट्रक‍पाकव‍के‍भीतर‍जनर्नमत‍ुंरचनाओं‍के‍जलए‍जनम्नजलजखत‍मानदंड‍लागू‍ूोंगे‍जजनका‍क्षेत्रफल‍25‍ूक्े टेयर‍ुे‍ ऄजधक‍ू।, क. रेस्ट्‍टजरेंट‍प्ल‍ ॉट‍का‍क्षेत्रफल‍0.8‍ूक्े टेयर‍या‍जजला‍पाक्र‍का‍1%‍जज‍भी‍कम‍ूज,‍ुे‍ऄजधक‍नूीं‍ूजना‍चाजूए। ख. रेस्ट्‍टजरंट‍प्ल‍ ॉट‍बाकी‍जजला‍पाकव‍क्षेत्र‍ुे‍भौजतक‍रूप‍ुे‍ऄलग‍नूीं‍ूजना‍चाजूए।‍ ग. यू‍भान‍एक‍मंजजला‍ुंरचना‍ूजना‍चाजूए।‍जजुका‍ऄजधकतम‍एफएअर‍5‍ूजना‍चाजूए‍और‍आुकी‍ऄजधकतम‍ उाँचाइ‍4‍मी.‍ूजनी‍चाजूए‍और‍यू‍अााुीय‍ुुजाधा‍तथा‍अु-पाु‍के‍क्षेत्र‍म‍ेंदकुी‍ुामंजस्ट्‍य‍के‍जबना‍ूजना‍ चाजूए।‍ घ. यदद‍अु-पाु‍के‍क्षेत्र‍म‍ेंकजइ‍पार्ककग‍लॉट‍नूीं‍ू‍,तज‍पार्ककग‍रेस्ट्‍तरां‍ुे‍ईपयुक्त‍ ‍दरू ी‍पर‍ूजनी‍चाजूए।‍पार्ककग‍ क्षेत्र‍रेस्ट्त‍ रां‍पररुर/ूररत‍क्षेत्र‍का‍जूस्ट्ु‍ ा‍नूीं‍ूजगा।‍‍‍ ङ. भूखंड‍क्षेत्र‍के‍30%‍कज‍ुघन‍ाक्षृ ारजपण‍के‍रूप‍में‍जाकजुत‍दकया‍जाएगा। ुभी‍प्रकार‍ की‍अााु‍ यजग्य‍जनर्नमत‍ जजला‍बुएईद्दिे ीय‍ ुंरचनाओं‍के‍ 40000 ागव‍मी. 2 मद, ान 1 एनए* एनए** 24 जलए‍ (4 ूक्े टेयर) ऄजधकतम‍ ऄनुमेय‍ उाँचाइ‍4.8‍ मीटर‍ू।, ऄन्य‍जनयत्रं ण:212 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] न्यनू तम‍भखू डं ‍ ऄजधकतम‍ न्यनू तम‍ क्र.ुं उाँचाइ ईपयजग‍पररुर‍ ु.ं क्षत्रे ‍(ाग‍व ग्राईंड‍कारेज एफएअर‍ मागाजव धका . (मी.) मी.)/यजू नट (%) र‍(मी.) ईप-िूर‍स्ट्तर जनुंख्या‍5,00,000 i. **‍बुएईद्देिीय‍म,दान‍के‍भीतर‍ुभी‍स्ट्थायी‍जनर्नमत‍ुरं चनाए,ं भूखंड‍क्षेत्र‍के‍1%या‍500‍ाग‍व मीटर,‍जज‍भी‍कम‍ ूज,‍ुे‍ऄजधक‍नूीं‍ूजनी‍चाजूए। ii. * कुल‍क्षेत्रफल‍का‍न्यूनतम‍50%‍ुॉफ्ट‍पार्ककग‍के‍ऄंतगवत‍ूजगा‍और‍िेी‍50%‍का‍ईपयजग‍गजतजाजधयों‍के‍जलए‍ दकया‍जाएगा। 3‍ूक्े टेयर‍ु‍े10‍ 3 जजला‍खले ‍केंद्र 1 20% 40 24 एनअर* ूक्े टेयर ऄन्य‍जनयत्रं ण: ऄजधकतम‍20%‍एफएअर क. ऄजधकतम‍5%‍के‍जलए- i. दकु ान, ii. रेस्ट्टजरेंट, iii. बैंक‍एक्ुटेंिन‍(काईंटर), iv. कायावलय‍(जाभागीय)। ख. न्यूनतम‍5%‍के‍जलए- i. छात्राााु‍/‍अााुीय‍अााु‍(खेल‍ुंबंधी‍्जि यों‍/‍जखलाजड़यों‍के‍जलए), ii. प्लॉरटग‍ूाईलुग‍(रखरखाा‍और‍प्रबंधन‍कमवचारी), iii. पुजलु‍पजस्ट्ट‍/‍फायर‍पजस्ट्ट, iv. जडजजटल‍आन्फ्रास्ट्रक्चर‍दकयजस्ट्क। * एएअइ,‍ऄजग्निमन‍जाभाग‍और‍ऄन्य‍ुांजाजधक‍जनकायों‍ुे‍मंजूरी‍के‍ऄधीन। न्यनू तम‍ ऄजधकतम‍ न्यनू तम‍ ईपयजग‍ उाँचाइ क्र.ु.ं ु.ं‍ भखू डं ‍क्षत्रे ‍ ग्राईंड‍ एफएअर मागाजव धकार‍ पररुर (मी.) /यजू नट कारेज (मी.) िूरी‍स्ट्तर जनुंख्या‍20,00,000‍ु‍े उपर ुभी‍प्रकार‍ की‍अााु‍ क्षत्रे ीय‍ 1 --- एनए एनए* --- एनए यजग्य‍ पाकव जनर्नमत‍ ुंरचनाओं‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 213 न्यनू तम‍ ऄजधकतम‍ न्यनू तम‍ ईपयजग‍ उाँचाइ क्र.ु.ं ु.ं‍ भखू डं ‍क्षत्रे ‍ ग्राईंड‍ एफएअर मागाजव धकार‍ पररुर (मी.) /यजू नट कारेज (मी.) िूरी‍स्ट्तर जनुंख्या‍20,00,000‍ु‍े उपर के‍जलए‍ ऄजधकतम‍ ऄनुमेय‍ उाँचाइ‍4.8‍ मीटर‍ू।, ऄन्य‍जनयत्रं ण:‍ i. जनर्नमत‍ुंरचना‍म‍ेंऐुे‍स्ट्थलों‍के‍प्राेि‍द्वारों‍पर‍ुुरक्षा‍केजबनों‍और‍मनजरंजन‍जजन/पुएचं ‍जजन‍के‍रूप‍म‍ेंजचजिृत‍क्षेत्रों‍म‍ें ुंबंजधत‍एजेजुयों‍के‍ऄनुमजदन‍ुे‍प्रजत‍ाग‍वमीटर‍2‍(दज)‍प्रुाधन‍कक्ष‍का‍प्रााधान‍िाजमल‍ूजगा। ii. दकुी‍ुाआट‍का‍ऄजधकतम‍0.1%‍क्षत्रे ,‍पक्क‍ ी‍ुतू‍तक‍प्रलतबंजधत‍ूजगा।‍जूा‍ाँ भी‍ुंभा‍ूज, फिव‍के‍जलए‍केाल‍भेदय‍ ुामग्री‍का‍ईपयजग‍दकया‍जाएगा। नजटः **क्षेत्रीय‍पाकव‍के‍ऄतं गतव ‍अन‍े ााली‍ान‍भूजम‍म‍ें जाकाु‍ान‍जाभाग‍के‍ऄनुुार‍ूजगा।‍ ुभी‍प्रकार‍ की‍अााु‍ यजग्य‍ जनर्नमत‍ 2 @10,00,000 जुटी‍पाकव ुंरचनाओं‍ 2 जनुंख्या‍ 40 ूक्े टेयर 1 एनए** 30 के‍जलए‍ ऄजधकतम‍ ऄनुमेय‍ उाँचाइ‍4.8‍ मीटर‍ू।, ऄन्य‍जनयत्रं ण: i. ऐुे‍जुटी‍पाकव‍के‍भीतर‍जनर्नमत‍ुंरचनाओं‍के‍जलए‍जनम्नजलजखत‍मानदडं ‍लाग‍ू ूोंग‍े जजनका‍क्षेत्रफल‍80‍ूक्े टेयर‍ु‍े ऄजधक‍ू।,  ऐुी‍गजतजाजधयों‍के‍जलए‍पार्ककग‍क्षेत्र‍जनर्नमत‍पररुर/ूररत‍क्षत्रे ‍का‍जूस्ट्ुा‍नूीं‍ूजना‍चाजूए। ii. 30%‍भूखंड‍क्षेत्र‍कज‍ुघन‍ाृक्षारजपण‍के‍रूप‍में‍जाकजुत‍दकया‍जाएगा। ुभी‍प्रकार‍की‍ अााु‍यजग्य‍ िूरी‍ 80,000‍ागव‍ जनर्नमत‍ 1 @10,00,000‍ 3 बुएईद्देिीय‍ मी. एनए* एनए** 30 ुंरचनाओं‍के‍ मद, ान जनुंख्या (8 ूक्े टेयर) जलए‍ऄजधकतम‍ ऄनुमेय‍उाँचाइ‍ 4.8‍मीटर‍ू।, ऄन्य‍जनयत्रं ण: i. ** बुएईद्देिीय‍म,दान‍के‍भीतर‍ुभी‍स्ट्थायी‍जनर्नमत‍ुंरचनाए,ं भूखंड‍क्षेत्र‍का‍1%‍या‍500‍ागव‍मीटर,‍जज‍भी‍कम‍214 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] न्यनू तम‍ ऄजधकतम‍ न्यनू तम‍ ईपयजग‍ उाँचाइ क्र.ु.ं ु.ं‍ भखू डं ‍क्षत्रे ‍ ग्राईंड‍ एफएअर मागाजव धकार‍ पररुर (मी.) /यजू नट कारेज (मी.) िूरी‍स्ट्तर जनुंख्या‍20,00,000‍ु‍े उपर ूज,‍ुे‍ऄजधक‍नूीं‍ूजनी‍चाजूए। ii. * कुल‍क्षेत्रफल‍का‍न्यनू तम‍50%‍ुॉफ्ट‍पार्ककग‍के‍ऄंतगवत‍ूजगा‍और‍िेी‍50%‍का‍ईपयजग‍गजतजाजधयों‍के‍जलए‍ दकया‍जाएगा। थीम‍ अधाररत‍/‍ 10 ूक्े टेयर‍ 4 --- 60 30 12 एम्यज़ू मटें ‍ तक 10% तक पाकव ुक्षम‍ प्राजधकाररयों‍ ुेप्राप्त‍ऄनुमजत‍ परु ातत्ा‍ 5 --- एनए 0.5%* --- 18 के‍ऄनुुार‍ पाकव ऄजधकतम‍ ऄनुमेय‍उाँचाइ‍ 6 मी.‍ू।, ऄन्य‍जनयत्रं णः i. *‍स्ट्थायी‍ुंरचनाओं‍के‍जलए‍ऄजधकतम‍जनर्नमत‍क्षेत्र, पाकव‍के‍0.5%‍क्षेत्र‍या‍10,000‍ागव‍मीटर,‍जज‍भी‍कम‍ूज,‍ुे‍ ऄजधक‍नूीं‍ूजगा। ii. आु‍जनर्नमत‍क्षेत्र‍की‍गणना‍में‍ऄनुकूली‍पुन:‍ईपयजग‍के‍जलए‍पूचानी‍गइ‍दकुी‍भी‍धरजूर‍ुंपजि‍कज‍िाजमल‍नूीं‍ दकया‍जाएगा।‍ iii. जनर्नमत‍क्षेत्र,‍धरजूर‍ुंपजियों‍पर‍ऄजधिाजुत‍ऄजधजनयमों‍और‍जनयमों‍ुजूत‍लाग‍ू ुांजाजधक‍प्रााधानों‍के‍ऄनुुार‍ ूजगा। iv. ुंरचनाओं‍के‍जडजाआन‍और‍उाँचाइ‍ुे‍धरजूर‍ुंपजि‍की‍दश्ृ य‍ ता‍बाजधत‍नूीं‍ूजगी‍और‍आुे‍ुक्षम‍प्राजधकारी‍द्वारा‍ ऄनुमजददत‍दकया‍जाएगा। v. लजक‍कला‍और‍स्ट्थापनाओं‍कज‍जनर्नमत‍क्षेत्र‍का‍जूस्ट्ुा‍नूीं‍माना‍जाएगा। vi. पाकव‍ुे‍ूजकर‍जान‍े ााले‍ुाआदकल‍र,क, स्ट्थानीय‍प,दल‍मागव‍और‍ाांजछत‍पुएचं ‍मागों‍का‍रख‍रखाा‍दकया‍जाएगा‍और‍ जनजित‍ुमय‍के‍दौरान‍जनता‍के‍जलए‍खलु ा‍रखा‍जाएगा। ढलान‍ााली‍ छत‍ जा, ‍ ुंरचनाओं‍ 6 जाजाधता‍ --- एनए 0.5%* --- --- के‍जलए‍ पाकव ऄजधकतम‍ 12 मीटर‍के‍ दज‍मंजजला‍ ऄन्य‍जनयत्रं ण: i. जनर्नमत‍ुंरचनाओं‍का‍ऄजधकतम‍ऄनुमेय‍क्षत्रे ‍पाकव‍क्षत्रे ‍का‍0.5% या‍10,000‍ागव.मी. जज‍भी‍कम‍ूज,‍ूजगा। ii. ज,ा-जाजाधता‍पाकों‍के‍भीतर‍बने‍भानों‍के‍"ूररत‍भान"‍मानदंड‍(गृू‍4‍स्ट्टार‍रेरटग)‍पूरे‍ूजने‍चाजूएं। ग्रीन‍बफर 7 --- एनए 0.5%* --- एनए 4.8‍मी.**[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 215 न्यनू तम‍ ऄजधकतम‍ न्यनू तम‍ ईपयजग‍ उाँचाइ क्र.ु.ं ु.ं‍ भखू डं ‍क्षत्रे ‍ ग्राईंड‍ एफएअर मागाजव धकार‍ पररुर (मी.) /यजू नट कारेज (मी.) िूरी‍स्ट्तर जनुंख्या‍20,00,000‍ु‍े उपर जनर्नमत‍ुरं चनाओं‍के‍जलए‍जनयत्रं ण: i. *‍स्ट्थायी‍ुंरचनाओं‍के‍जलए‍ऄजधकतम‍जनर्नमत‍क्षेत्र, ुाआट‍के‍0.5%‍क्षेत्र‍ुे‍ऄजधक‍नूीं‍ूजगा। ii. ** स्ट्थायी‍ुंरचनाओं‍की‍ऄजधकतम‍उाँचाइ‍4.8‍मी.‍ूजगी‍जुााए‍एएअइ,‍एचुीुी,‍डीयूएुी,‍डीटीएल‍द्वारा‍यथा‍ जनधावररत‍। iii. जूााँ‍बफर‍जाकाु‍के‍जलए‍दकुी‍पररयजजना‍म‍ें धरजूर‍ुंपजि‍िाजमल‍ूज, ाूां‍जनर्नमत‍क्षत्रे ,‍धरजूर‍ुंपजियों‍पर‍ िाजुत‍ऄजधजनयमों‍और‍जनयमों‍ुजूत‍लागू‍ुांजाजधक‍प्रााधानों‍के‍ऄनुुार‍ूोंगा। iv. ऄजधकतम‍ुूायक‍ऄनुमेय‍कुल‍जनर्नमत‍ुंरचना‍का‍20%‍-‍ुंग्रूालय‍और‍ुूचना‍केंद्र, रेस्ट्तरा,ं क,फे‍(1‍ूक्े टेयर‍के‍ न्यूनतम‍ुमेदकत‍क्षत्रे ‍पर‍लाग)ू ‍ू।, ऄन्य‍जनयत्रं ण: i. पाकव‍ुाआट‍ुे‍ूजकर‍जाने‍ााले‍ुाआदकल‍र,क, स्ट्थानीय‍प,दल‍माग‍व और‍ाांजछत‍पुएचं ‍मागों‍कज‍रख‍रखाा‍दकया‍ जाएगा‍और‍जनजित‍ुमय‍के‍दौरान‍जनता‍के‍जलए‍खलु ा‍रखा‍जाएगा। ii. जूां‍भी‍ुंभा‍ूज, ऐुी‍ुाआटों‍के‍कजनों‍के‍ुाथ-ुाथ‍नइ‍ुरं चनाएं‍आन‍स्ट्थलों‍के‍ुामन‍े ूोंगी।‍चारदीाारी‍1‍मी.‍ की‍उाँचाइ‍ुे‍उपर‍पारदिी‍ूोंगी।‍ग्रीन‍बफर‍का‍रख‍रखाा‍दकया‍जाना‍चाजूए,‍जज ुभी‍ऄजधभारों‍ुे‍मि ु ‍और‍ जनता‍के‍जलए‍खलु ा‍ूजना‍चाजूए। 1,00,000 िूर‍स्ट्तर‍ ागव‍मी. के‍खेल:‍ 1 @10,00,000‍ 8 (10 20% 40 30 एनअर* प्रभागीय‍ जनुंख्या ूक्े टेयर) खेल‍केंद्र‍ ऄन्य‍जनयत्रं ण: कुल‍एफएअर‍का‍ऄजधकतम‍20% क. ऄजधकतम‍5% i. दकु ान, ii. रेस्ट्टजरेंट, iii. बैंक‍एक्ुटेंिन‍(काईंटर), iv. कायावलय‍(जाभागीय)। क. न्यूनतम‍5%‍के‍जलए- i. छात्राााु‍/‍अााुीय‍अााु‍(खेल‍ुंबंधी‍्जि यों‍/‍जखलाजड़यों‍के‍जलए), ii. प्लॉरटग‍ूाईलुग‍(रखरखाा‍और‍प्रबंधन‍कमवचारी), iii. पुजलु‍पजस्ट्ट‍/‍फायर‍पजस्ट्ट, iv. जडजजटल‍आन्फ्रास्ट्रक्चर‍दकयजस्ट्क। *एएअइ, ऄजग्निमन‍जाभाग‍और‍ऄन्य‍ुांजाजधक‍जनकायों‍ुे‍मजं ूरी‍के‍ऄधीन।216 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] न्यनू तम‍ ऄजधकतम‍ न्यनू तम‍ ईपयजग‍ उाँचाइ क्र.ु.ं ु.ं‍ भखू डं ‍क्षत्रे ‍ ग्राईंड‍ एफएअर मागाजव धकार‍ पररुर (मी.) /यजू नट कारेज (मी.) िूरी‍स्ट्तर जनुंख्या‍20,00,000‍ु‍े उपर मनजरंजन‍क्षत्रे ों‍के‍जलए‍ऄन्य‍जनयत्रं ण: i. जलजनकाु‍या‍जलाियों‍के‍ुाथ-ुाथ‍ऄाजस्ट्थत‍ुभी‍नइ‍पररयजजनाओं‍में‍(1‍ूक्े ट‍ेयर‍ुे‍उपर), जूां‍तक‍ुंभा‍ ूज, जलाियों‍/‍जलजनकाु‍के‍दकनारे‍ुे‍10‍मीटर‍का‍न्यूनतम‍ऄजनाायव‍बफर‍बरकरार‍रखा‍जाएगा। ii. ुभी‍स्ट्थायी‍और‍ऄस्ट्थायी‍जनमावण‍कज‍ुभी‍के‍जलए ुमााेिी‍बनाया‍जाएगा‍और‍आुमें‍ददव्‍यांग‍्जि यों‍की‍ अाश्यकताओं‍कज‍ुमाजूत‍दकया‍जाएगा। iii. ुभी‍रून‍े यजग्य‍जनर्नमत ुंरचनाएं‍4.8‍मीटर‍ुे‍ऄजधक‍नूीं‍ूोंगी‍जब‍तक‍ऄन्यथा‍जनर्ददष्ट‍‍न‍दकया‍जाए‍ ज,ुादक‍ज,ा‍जाजाधता‍पाकव‍अदद‍के‍मामल‍े में‍दकया‍जाता‍ू।, iv. यमुना‍फ्लड‍प्लने ‍म‍ें मनजरंजनात्मक‍गजतजाजधयों‍की‍ऄनमु जत‍ूजगी‍ज,ुादक‍ददजाप्रा‍द्वारा‍जाकजुत‍यमुना‍ कॉम्प्रूजें ुा‍प्लान‍के‍रूप‍म‍ें पूचान‍की‍गइ‍ू‍, (ुंदभव:‍ENV: 2)।‍आन‍ज़जन‍म‍ें जाकजुत‍जनर्नमत‍ुंरचनाओं‍के‍ मानदंड‍जनम्नानुुार‍ूोंगे: क. ऐुी‍ुभी‍ुंरचनाओं‍के‍जलए‍ऄजधकतम‍जनर्नमत‍क्षेत्र, भू-खण्ड‍के‍0.5% क्षेत्र‍या‍10,000 ागव‍मीटर, जज‍भी‍कम‍ूज, ुे‍ऄजधक‍नूीं‍ूजगा। v. पाकव‍और‍बुएईद्देिीय‍मद, ानों‍के‍जलए: क. पक्की‍ुतू‍कुल‍पाकव‍क्षेत्र‍के‍1% ुे‍ऄजधक‍नूीं‍ूजगी। ख. ातवमान‍में‍जडजस्ट्रक‍पाकव‍या‍जुटी‍पाकव‍के‍रूप‍म‍ेंुंचाजलत/प्रयक्ु त‍ ‍कजइ‍भी‍पाकव‍आुी‍नाम‍के‍ऄंतगतव ‍बना‍रूगे ा। ग. कुल‍क्षेत्रफल‍का‍न्यूनतम‍50% ुॉफ्ट‍पार्ककग‍के‍ऄंतगवत‍ूजगा‍और‍िेी‍50% का‍ईपयजग‍गजतजाजधयों‍के‍जलए‍ दकया‍जाएगा। घ. िेी‍क्षेत्र‍का‍न्यूनतम‍3% (ुॉफ्ट‍पार्ककग‍क्षेत्र‍कज‍छजड़कर)‍का‍ईपयजग‍आलेजक्रक‍ुब‍स्ट्टेिन, प्रुाधन, ुुरक्षा‍और‍ ऄन्य‍जाााू‍ुे‍ुंबंजधत‍गजतजाजधयों‍अदद‍के‍जलए‍दकया‍जाएगा। ङ. बुएईद्देिीय‍म,दान‍कज‍न्‍यूनतम‍0.5‍ूक्े टेयर‍भूखण्‍ड‍क्षेत्र‍के‍ुाथ‍ुमुजचत‍रूप‍ुे‍ईप-जाभाजजत‍दकया‍जाता‍ ुकता‍ू‍,तादक‍एक‍ुमय‍म‍ेंबुएत-ुे‍कायव‍दकए‍जा‍ुकें। च. ुभी‍पाकव/बुएईद्देिीय‍म,दानों‍(5 ुे‍10%) में‍ाीाव‍जल‍ुंचयन‍के‍प्रााधान‍ूोंगे। छ. नेबरुएड‍पाकव, ूाईलुग‍पाकव, पड़जु‍का‍खले ‍का‍म,दान, ूाईलुग,‍खले ‍का‍म,दान‍और‍टजट‍लॉट्ु‍पूरी‍तरू‍ु‍े अााुीय‍क्षेत्र‍का‍जूस्ट्ुा‍ूोंगे। ज. ुभी‍प्रकार‍की‍अााु‍यजग्य‍जनर्नमत‍ुंरचनाओं‍के‍जलए‍ऄजधकतम‍ऄनुमेय‍उाँचाइ‍4.8 मीटर‍ू‍, (जब‍तक‍दक‍ ऄन्यथा‍जनर्ददष्ट‍न‍दकया‍गया‍ूज)।‍न्यूमेरटक‍ुरं चनाए‍ं और‍काआनेरटक‍अगं न‍(ऄंतरराष्ट्रीय‍मानकों‍के‍ऄनुुार), ऄस्ट्थायी‍ुंरचनाए,ं प्रजतजष्ठत‍ुंरचनाएं, मूर्नतयां‍और‍स्ट्थापना‍ाास्ट्‍तुजिल्‍प‍की‍जािेीताओं‍ााली‍ुंरचनाए‍ं जज‍ रूने‍यजग्य‍नूीं‍ू,ैं एफएअर‍ुे‍मुि ‍ूोंगी‍और‍प्राजधकरण‍का‍ऄनुमजदन‍ूजन‍े पर‍आन‍पर‍कजइ‍उाँचाइ‍प्रजतबंध‍ लाग‍ूनूीं‍ूजगा।‍पुराताजत्ाक‍पाकों‍के‍जलए, ऄनुमजदन‍ऄजधकाररयों‍ुे‍अाश्यक‍ऄनुमजत‍लेनी‍ूजगी। झ. ुुख-ुुजाधा‍ुंरचनाओं‍में‍प्रुाधन‍ब्लॉक, पंप‍रूम, आलेजक्रक‍रूम, गाड‍व कक्ष, भंडार‍कक्ष‍और‍ईपकरण‍कक्ष‍ िाजमल‍ू।ैं ‍य‍ेस्ट्थानीय‍स्ट्तर‍कज‍छजड़कर‍ुभी‍पाकों‍में‍ऄनुमेय‍ूोंगे।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 217 ञ. जजन‍पाकों‍की‍पूचान‍बाढ़‍म‍ेंडूबे‍क्षेत्रों‍के‍रूप‍में‍की‍गइ‍ू,, ईनके‍पाु‍कजइ‍स्ट्थायी‍जनमावण‍नूीं‍ूजगा। ट. ईन‍पाकों‍में‍मल्टी-जजम‍ऄनुमये ‍ूजगा‍जजनका‍क्षेत्रफल‍1 ूक्े टेयर‍ू‍, और‍जजनम‍ें न्‍यनू तम‍225 ‍और‍ऄजधकतम‍ 500‍ाग‍व मी.‍का‍जनर्नमत‍क्षेत्र‍ूजगा। ठ. आन‍पाकों‍के‍प्राेि‍द्वार‍पर‍ऄनौपचाररक‍दकु ानों‍की‍जनम्न‍ ात‍ऄनुमजत‍दी‍जाएगी:  िूर/जजला‍पाकवः‍प्रमुख‍प्राेि‍द्वार‍पर‍8-10  ुामुदाजयक‍पाकवः‍प्रमुख‍प्राेि‍द्वार‍पर‍2-5  बुएईद्देिीय‍म,दान प्रमुख‍प्राेि‍द्वार‍पर‍2-5 ड. नालों‍के‍दकनारे-दकनारे‍पाकों‍और‍ूररत‍कॉररडजर‍के‍जाकाु‍म‍ें भूजल‍और‍जलाियों‍जनकायों‍के‍ुंरक्षण‍कज‍ िाजमल‍दकया‍जाना‍चाजूए।‍भूजल‍पनु भवरण‍के‍जलए, जलाियों‍और‍ाीाव‍जल‍का‍ुंरक्षण‍ऄजनाायव‍करना‍ूजगा।‍ नजफगढ़‍झील‍और‍ईुके‍अुपाु‍के‍क्षेत्र‍और‍ररज‍कज‍ुंभाजात‍जल‍ुरं क्षण‍क्षेत्र‍के‍रूप‍म‍ें भी‍आस्ट्तेमाल‍दकया‍ जा‍ुकता‍ू।, vi. खले ‍ुजु ाधाए:ाँ क. ि,जक्षक‍ुंस्ट्थानों‍और‍भ-ू दश्ृ यांकन‍क्षेत्रों‍के‍अुपाु‍के‍क्षेत्र‍में‍ऄजधमानतः‍नए‍खले ‍के‍म,दान‍ईपलब्ध‍ /जाकजुत‍ दकए‍जाएंगे। ख. ग्रपु ‍ूाउलुग‍क्षेत्रों, स्ट्कूलों, क्लबों‍अदद‍के‍भीतर‍खले ‍ुुजाधाओं‍और‍जस्ट्ालमग‍पलू ‍(ऄजधकतम‍100 ागव‍मीटर)‍ के‍जाकाु‍कज‍बढ़ााा‍देने‍के‍जलए‍ग्राईंड‍कारेज‍और‍एफएअर‍की‍गणना‍नूीं‍की‍जाएगी। ग. आन‍ुभी‍जाजभन्न‍खेल‍ुुजाधाओं‍म‍ेंलअे ईट‍यजजना, भू-दश्ृ याकं न‍यजजना‍और‍पार्ककग‍यजजना‍अदद‍ूोंगे। घ. खेल‍का‍म,दान‍और‍खेल‍ुुजाधाएं, जूां‍ुंभा‍ूज, प,दल‍और‍ुाआदकल‍र,क‍के‍नेटाकव‍द्वारा‍ुलु भ‍ूजनी‍चाजूए। ङ. पयावप्‍त‍पार्ककग‍के‍ुाथ‍ुमुजचत‍लअे ईट‍यजजना‍और‍भ-ू दश्ृ यांकन‍यजजना‍के‍ऄनुुार‍खेल‍ुुजाधाओं‍का‍जाकाु‍ दकया‍जाएगा। च. मौजूदा‍खेल‍ऄाुंरचनाओं‍कज‍ईन्नत‍दकया‍जाएगा‍और‍कुिलता‍ु‍े पुन:‍जनयजजजत‍दकया‍जाएगा‍तादक‍बेूतर‍ ुुजाधाएं‍प्रदान‍की‍जा‍ुके। छ. ईन‍पाकों‍में‍जजनका‍क्षेत्रफल‍1 ूक्े टेयर‍ू‍, और‍225 ागवमीटर‍का‍ऄनुमत‍जनर्नमत‍क्षेत्र‍ूज,‍मल्टी-जजम‍ऄनुमेय‍ ूजगा। 22.12 ‍परराून क. जाकाु‍जनयत्रं ण‍मानदडं ताजलका‍22.39‍- परराून जाकाु‍जनयत्रं ण^ ुचं ालन‍के‍ भान‍के‍ यात्री‍/‍कमचव ारी‍ ईपयजग‍ मागाजव धकार** क्र.ु.ं भखू डं ‍क्षत्रे तूत‍क्षत्रे ‍ ऄतं गतव ‍क्षत्रे ‍ अााु‍के‍जलए‍ पररुर एफएअर* (मी.) (न्यूनतम) (%) (%) एफएअर‍(%) (ऄजधकतम) (ऄजधकतम) (ऄजधकतम) 1. एयरपजट व एयरपजटव‍ऄथॉररटी‍ऑफ‍आंजडया‍(एएअइ)‍के‍मानदडं ों‍के‍ऄनुुार218 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] रेल‍टर्नमनल‍/‍ आंटीग्रटे ेड‍ 2. -लागू‍नूीं- 70 30 100 15 -‍लाग‍ूनूीं‍- पु, जें र‍ टर्नमनल 3. अइएुबीटी 10 ूक्े टेयर 60 40 100 30 45 4. बु‍जडपज 0.4 ूक्े टेयर 50 50 100 25 24 ुााजव जनक‍ बुों‍के‍जलए‍ 5. 2 ूक्े टेयर 100 50 100 25 24 बुए-स्ट्तरीय‍ पार्ककग 0.1 ूक्े टेयर‍ (ुामुदाजयक‍ 50 50 100 25 18 स्ट्तर) 6. बु‍टर्नमनल 0.2 ूक्े टेयर‍ (ईप-िूर‍ 50 50 100 25 18 स्ट्तर) मरे ज‍स्ट्टेिनों‍के‍ अाश्यकता‍ 7. जलए‍ुपं जि‍ 3 ूक्े टेयर‍तक 25 100 -‍लाग‍ूनूीं- -‍लाग‍ूनूीं- के‍ऄनुुार जाकाु मरे ज‍/‍ 8. अरअरटीएु‍ -‍लाग‍ूनूीं- 80% 20% 100 15% -‍लाग‍ूनूीं‍- याड व बुए-स्ट्तरीय‍ 9. 0.1 ूक्े टेयर -लागू‍नूीं- 66.6% 100 -‍लाग‍ूनूीं- 18 पार्ककग फ्यलू ‍स्ट्टेिन 30 मीटर‍X 36 मीटर‍ (न्यूनतम) 10. 80 20 40 -‍लाग‍ूनूीं‍- 30 33 मीटर‍X 45 मीटर‍ (ऄजधकतम) ^ नीचे‍ईजल्लजखत‍'ऄन्य‍जनयंत्रणों' के‍ुाथ‍पढ़ा‍जाए। * एफएअर‍की‍गणना‍और‍ईपयजग‍केाल‍भान‍भूखंड‍पर‍दकया‍जाना‍चाजूए।‍बु‍िेल्टर‍के‍तूत‍क्षेत्र‍कज‍एफएअर‍म‍ें िाजमल‍नूीं‍दकया‍जाना‍चाजूए। ** ुभी‍मौजूदा‍ईपयजग‍पररुर‍कायव‍करना‍जारी‍रखेंगे। ऄन्य‍जनयत्रं ण: i. एयरपजट:व क. ऄनुमत‍गजतजाजधयाः‍एयरपजट‍व ऄथॉररटी‍ऑफ‍आंजडया‍द्वारा‍जनधावररत‍‍ूााइऄड्‍डे/जामानन‍याजत्रयों‍ुे‍ ुंबंजधत‍ुभी‍ुुजाधाएं‍। ii. रेल‍टर्नमनल‍/‍आंटीग्रटे ेड‍पु, जें र‍टर्नमनल‍/‍मरे जपॉजलटन‍पु, जें र‍टर्नमनल:[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 219 क. ऄनुमत‍गजतजाजधयां: रेला‍े ुंचालनों,‍याजत्रयों,‍गडु ु‍ूडैं ललग,‍ाॉच‍एडं ‍ााडव,‍ूजटल,‍र,नबुेरों‍ुे‍ुंबंजधत‍ ुभी‍ुुजाधाएं। ख. केाल‍टीओडी‍मानदंडों‍के‍ऄनुु ार‍जनधावररत‍दकए‍गए‍रेल‍टर्नमनल/आंटीग्रेटेड‍प,ुेंजर‍टर्नमनल/मल्टी-मॉडल‍ रांुपजटव‍ूब‍कज‍जाकजुत‍दकया‍जाएगा, जज‍दक‍अुपाु‍के‍ुड़क‍नेटाकव‍ुे‍ुंबंजधत‍यातायात‍और‍ परराून‍ऄ्ययन‍की‍ितों‍के‍ऄधीन‍ूजगा। iii. अइएुबीटी: क. ऄनुमत‍गजतजाजधयााँ:‍बु‍ुंचालन‍और‍याजत्रयों, बु‍टर्नमनल, पार्ककग, ाॉच‍और‍ााड,व ुॉफ्ट‍लड्रक‍और‍ स्न,क‍स्ट्टाल, कायावलय, ूजटल, नाआट‍िल्े टर, ााजणजज्यक, ुामाजजक‍बुजनयादी‍ढांचे, अााुीय, ुेाा‍ ऄपाटवमेंट, छात्राााु‍ुे‍ुंबंजधत‍ुभी‍ुुजाधाएं। ख. एफएअर‍ऄजधकतम‍10 ूक्े टेयर‍क्षेत्र‍पर‍ऄथाा‍ुाआट‍के‍क्षेत्र,‍जज‍भी‍कम‍ूज,‍पर‍ईपलब्ध‍ूजगा।‍ पररचालन‍ुंरचनाओं‍ुजूत‍अइएुबीटी‍का‍ऄजधकतम‍एफएअर‍70 ू,, और‍ूजटल/यात्री‍अााु‍तथा‍ ुुजाधाओं‍का‍ऄजधकतम‍एफएअर‍30 ू।, ग. पार्ककगः‍अइएुबीटी‍/‍बुों‍के‍जलए‍पार्ककग‍की‍अाश्यकता‍के‍ऄलााा, ूजटल‍/‍यात्री‍अााु‍और‍ ुुजाधाओं‍के‍जलए‍पार्ककग, 2 इुीएु‍प्रजत‍100 ागवमीटर‍के‍फिव‍क्षेत्र‍की‍दर‍ुे‍ूजगा। घ. जाकाु‍कज‍एक‍ुमग्र‍तरीके‍ुे‍कायावजन्ात‍दकया‍जाएगा। ङ. केाल‍अइएुबीटी‍कज यदद‍टीओडी‍नजड‍के‍रूप‍में‍जनधावररत‍दकया‍गया‍ू‍, तज‍आुे‍टीओडी‍मानदंडों‍के‍ ऄनुुार‍जाकजुत‍दकया‍जाए, जज‍दक‍अुपाु‍के‍ुड़क‍नटे ाकव‍ुे‍ुंबंजधत‍यातायात‍और‍परराून‍ ऄ्ययन‍की‍ितों‍के‍ऄधीन‍ूजगा। iv. बु‍जडपज: क. ऄनुमत‍गजतजाजधयााँ:‍बु‍ुंचालन‍और‍याजत्रयों, बु‍टर्नमनल, पार्ककग, ाॉच‍और‍ााड,व ुॉफ्ट‍लड्रक‍और‍ स्न,क‍ स्ट्टाल, कायावलय, ूजटल, ााजणजज्यक, ुामाजजक‍ बुजनयादी‍ ढांचे, अााुीय, ुेाा‍ ऄपाटवमेंट, छात्राााु‍ुे‍ुंबंजधत‍ुभी‍ुुजाधाएं। ख. ईप-िूरी‍स्ट्तर‍पर‍बु‍जडपज‍के‍क्षेत्र‍अाश्यकता‍ऄनुुार‍ूोंगे। ग. जूां‍तक‍ुंभा‍ूज, बु‍जडपज‍कज‍बु‍टर्नमनलों‍के‍रूप‍में‍काय‍वकरना‍चाजूए। घ. बु‍जडपज‍ुाआट‍कज, यदद‍टीओडी‍नजड‍के‍रूप‍म‍ें जनधावररत‍दकया‍गया‍ू‍, तज‍ईुे‍टीओडी‍मानदंडों‍के‍ ऄनुुार‍जाकजुत‍दकया‍जाए, जज‍दक‍अुपाु‍के‍ुड़क‍नटे ाकव‍ुे‍ुंबंजधत‍यातायात‍और‍परराून‍ ऄ्ययन‍की‍ितों‍के‍ऄधीन‍ूजगा। v. ुााजव जनक‍बुों‍के‍जलए‍बुए-स्ट्तरीय‍पार्ककग: क. मनजरंजन‍ूते ‍ु खुल‍े स्ट्थान‍और‍पयावारण‍के‍प्रजत‍ुंाेदनिील‍क्षेत्रों‍कज‍छजड़कर, ुभी‍ईपयजग‍जजनों‍म‍ें बुएस्ट्तरीय‍बु‍पार्ककग‍की‍ऄनमु जत‍ूजगी। ख. ुाआट‍पर‍न्यनू तम‍1 बु‍प्रजत‍70 ागवमीटर‍की‍दर‍ुे‍कम‍ुे‍कम‍ाांजछत‍ुंख्या‍के‍बुों‍के‍जलए‍अाश्यक‍ पार्ककग‍की‍जगू‍ूजनी‍चाजूए। ग. भूखंड‍क्षेत्र‍के‍50% ुे‍ऄजधक‍क्षेत्र‍के‍जलए‍100 का‍एफएअर‍ऄनुमेय‍ू।, ‍आुमें‍पजजडयम-अधाररत‍भान‍ के‍मानदंड‍लागू‍ूोंगे। घ. पररचालन‍ुंरचनाएं‍और‍ुंचलन‍क्षेत्र‍भूखंड‍क्षेत्र‍के‍100% कज‍िाजमल‍(कार)‍कर‍ुकत‍े ू,ैं और‍आु‍े एफएअर‍के‍ऄदं र‍जगना‍नूीं‍जाएगा। ङ. ऄजधकतम‍उाँचाइ‍स्ट्थानीय‍बा्यताओं‍ज,ुे‍ईड़ान‍पथ, जाराुत‍जजन‍के‍ऄनुुार‍ूजगी।220 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] च. ुंरचनात्मक‍ुुरक्षा‍की‍ितों‍के‍ऄधीन, बेुमेंट‍के‍स्ट्तरों‍की‍ुंख्या‍पर‍कजइ‍प्रजतबंध‍नूीं‍ूजगा। छ. एकीकृत‍यजजनाओं‍के‍मामल‍े में, उाँचाइ‍ुजूत‍जाकाु‍जनयत्रं ण‍ऄनुमजददत‍यजजना‍के‍ऄनुुार‍ऄथाा‍ स्ट्थानीय‍प्रजतबंध, यदद‍कजइ‍ूज,‍के‍ऄनुुार‍ूजगा। vi. बु‍टर्नमनल: क. ऄनुमत‍गजतजाजधयााँ:‍बु‍ुंचालन‍और‍याजत्रयों, ुॉफ्ट‍लड्रक‍और‍स्न,क‍स्ट्टाल‍ु‍ेुंबंजधत‍ुभी‍ुुजाधाएं। vii. मरे ज‍स्ट्टेिनों‍के‍जलए‍ुपं जि‍जाकाु: क. मनजरंजन‍और‍क्षेत्रीय‍पाकव/ररज‍ईपयजग‍जजन, लुरटयंु‍बंगला‍जजन‍और‍जाराुत‍जजन‍कज‍छजड़कर, मेरज‍ स्ट्टेिनों‍के‍ुाथ-ुाथ‍3.0 ूक्े टेयर‍के‍ऄजधकतम‍क्षेत्र‍तक‍के‍ुंपजि‍जाकाु‍(ुमग्र‍जाकाु)‍के‍जलए‍ुभी‍ ईपयजग‍जजनों‍म‍ें ऄनुमजत‍दी‍जाएगी, जज‍दक‍ददजाप्रा‍की‍तकनीकी‍ुजमजत‍ुे‍प्राप्त‍ऄनुमजदन‍की‍ित‍व के‍ ऄधीन‍ूजगा। ख. ुंपजि‍जाकाु‍के‍आु‍प्रााधान‍कज‍ुक्षम‍कर‍के‍जनम्नजलजखत‍्ापक‍जाकाु‍जनयंत्रण‍ूोंगेः 1. 25% ग्राईंड‍कारेज‍और‍100 एफएअर, जजुमें‍जबना‍दकुी‍ईंचाइ‍प्रजतबंधों‍के‍मेरज‍स्ट्टेिन‍के‍ तूत‍िाजमल‍क्षेत्र, जज‍दक‍एएुअइ, जामानपिन‍प्राजधकरण, डीयूएुी‍अदद‍ज,ुे‍ुांजाजधक‍ जनकायों‍ुे‍ऄनुमजदन‍की‍ितों‍के‍ऄधीन‍ूोंगे। 2. मेरज‍स्ट्टेिनों‍के‍जलए‍पार्ककग‍की‍जरूरतों‍के‍ऄजतररि ‍कमर्नियल‍ऄायाों‍की‍पार्ककग‍प्रजत‍100‍ ागवमीटर‍के‍2‍इुीएु‍की‍दर‍पर‍ूजगी। 3. जाकाु‍कज‍एक‍ुमग्र‍तरीके‍ुे‍कायावजन्ात‍दकया‍जाएगा‍और‍डीएमअरुी‍ुभी‍ुंबंजधत‍ स्ट्थानीय‍जनकायों/एजेंजुयों‍ुे‍ऄनुमजदन‍प्राप्त‍करेगा। ग. मरे ज‍ुाआट,‍जजन्ू‍ें टीओडी‍नजड‍के‍रूप‍में‍जनधावररत‍दकया‍गया‍ू‍, तज‍ईुे‍टीओडी‍मानदडं ों‍के‍ऄनुुार‍ जाकजुत‍दकया‍जाए‍जज‍दक‍अुपाु‍के‍ुड़क‍नेटाकव‍ुे‍ुबं ंजधत‍यातायात‍और‍परराून‍ऄ्ययन‍की‍ ितों‍के‍ऄधीन‍ूजगा। घ. जनम्नजलजखत‍ुंरचनाओं‍कज‍पररचालन‍ुंरचनाओं‍के‍रूप‍म‍ेंमाना‍जाएगाः 1. ुभी‍मेरज‍स्ट्टेिन‍और‍ग्रेड‍ुपजर्टटग‍र,क, एजलाेटेड‍और‍ऄडं रग्राईंड‍जजुमें‍प्रािे ‍ुंरचनाएं‍ ुूायक‍भानों‍ुे‍ूाईु डीजी‍ुेट, जचललग‍प्लांट‍और‍आलेजक्रक‍ुबस्ट्टेिन, ुप्लाइ‍एग्जॉस्ट्ट‍ और‍टनल‍ाेंरटलेिन‍िाफ्ट‍अदद‍िाजमल‍ू।ैं 2. जडपज‍और‍रखरखाा‍कायविालाएं। 3. कीवण‍(रेक्िन)‍ईप-स्ट्टेिन। 4. पररचालन‍जनयंत्रण‍केन्द्र। 5. पुजलु‍स्ट्टेिन। 6. पररचालन‍और‍रखरखाा‍कमचव ाररयों‍के‍जलए‍भती‍और‍प्रजिक्षण‍केंद्र। 7. केाल‍पररचालन‍कमवचाररयों‍और‍मेरज‍ुुरक्षा‍पुवनल‍के‍जलए‍अााु। 8. मेरज‍पररयजजना‍के‍जनमावण‍के‍जलए‍पनु ाावु‍कायव‍कज‍प्रारंभ‍करना। 9. ुाावजजनक‍ुुजाधाओं‍कज‍पूरा‍करने‍के‍जलए‍मेरज‍स्ट्टेिनों‍में‍दकु ानें‍। 10. मेरज‍स्ट्टेिनों‍के‍फुटलप्रट‍पर‍प्लट, फॉमव‍के‍उपर‍ुरं चनाएं। viii. मरे ज‍/‍अरअरटीएु‍याड:व क. ऄनुमत‍गजतजाजधयां:‍कजचों‍की‍खाली‍पार्ककग, धुलाइ‍और‍ुफाइ‍की‍ुुजाधा, रखरखाा‍ुे‍ुंबंजधत‍ ुुजाधाएं, चौकुी‍एां‍जनगरानी‍(ाॉच‍एंड‍ााडव), तथा‍कमवचाररयों‍ुे‍ुंबंजधत‍ुुजाधाएं। ix. बुए-स्ट्तरीय‍पार्ककग: 1. स्ट्‍थानीय‍ जनकायों‍ द्वारा‍ बुए-स्ट्‍तरीय‍ कार‍ पार्ककग‍(एमएलुीपी)‍ के‍ जलए‍ पूले‍ ु‍े ूी‍ भू-खंडों‍ कज‍ जचजहन्त‍ /जनधावररत‍कर‍जलया‍गया‍ू,े‍मौजूदा‍जाकाु‍जनयंत्रण‍मानक‍जनम्न‍ ानुुार‍लाग‍ूरूगें े:‍ क. भू-खंड‍का‍न्‍यूनतम‍अकार-1000‍ागव‍मी.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 221 ख. ऄजधकतम‍ऄनुमेय‍एफएअर‍(पार्ककग‍क्षेत्र‍कज‍छजड़कर)‍ भू-खंड‍का‍अकार‍ एफएअर‍ 3000‍ाग‍वमीटर‍तक‍ 100 3000‍-10,000‍ागव‍मी.‍ुे‍ऄजधक‍ 3000‍ाग‍व मी.‍तक‍100‍एफएअर+िेी‍बची‍भूजम‍ पर‍ऄजतररक्त‍ ‍60‍एफएअर 10,000‍ागव‍मी. 3000‍ागव‍मी.‍तक‍100‍एफ‍ए‍अर+10,000‍ाग‍व मीटर‍तक‍ऄजतररक्त‍ ‍60‍एफएअर+िेी‍बची‍भूजम‍ पर‍ऄजतररक्त‍ ‍50‍एफएअर ग. ऄजधकतम‍ग्राईंड‍कारेज-66.6% घ. ुक्षम‍एजेंुी‍ुे‍व्‍याूायवता‍ररपजटव‍और‍यातायात‍पुजलु‍और‍ऄन्‍य‍ुंजाजधक‍जनकायों‍ुे‍ऄनापजि‍ प्रमाण-पत्र‍की‍ितवर‍पर‍12‍मी.‍और‍आुुे‍ऄजधक‍के‍मागावजधकार‍की‍ुड़कों‍पर‍एमएलुीपी‍भू-खंड‍ ूोंगे।‍ ङ. लाभकारी‍ईपयजग‍ऄथावत‍् स्ट्‍थानीय‍िॉलपग‍ुेंटर‍म‍ें ऄनुमये ‍गजतजाजधयों,‍ुाावजजनक‍और‍ऄध-व ुाावजजनक‍ईपयजग‍और‍बैंक्ा‍ ेट‍ूॉल‍और‍मल्‍टीप्‍लेक्ु‍ ‍कज‍छजड़कर‍अााुयी‍ईपयजग।‍ x. ईंधन‍स्ट्टेिनः क. 'रीजनल‍पाकव/ररज', जाकजुत‍जडजस्ट्रक्ट‍पाकव‍और‍जजन‍'ओ' कज‍छजड़कर, ुभी‍ईपयजग‍जजनों‍म‍ें ुीएनजी‍स्ट्टेिनों‍कज‍ऄनुमजत‍दी‍जा‍ुकती‍ू।, ‍जजन‍'ओ' तथा‍मनजरंजन‍ईपयजग‍जजन‍कज‍छजड़कर‍ुभी‍ ईपयजग‍जजनों‍म‍ेंपेरजल‍पंपों‍की‍ऄनुमजत‍ूजगी। ख. ईंधन‍स्ट्टेिनों‍कज‍मास्ट्टर‍प्लान/जजनल‍यजजना‍ुड़कों‍म‍ें ऄनुमजत‍दी‍गइ‍ू‍, और‍क्षेत्र‍का‍ऄनुमजददत‍ जजनल‍प्लान‍की‍न‍ूजन‍े की‍जस्ट्थजत‍म‍ेंआुकी‍ऄनुमजत‍नूीं‍दी‍जाएगी। ग. ईंधन‍स्ट्टेिन‍एां‍ुर्नाु‍स्ट्टेिनों‍कज‍ऄाजस्ट्थत‍करने‍के‍जलए‍ुक्षम‍प्राजधकारी‍द्वारा‍बनाइ‍गइ‍नीजत/‍जलए‍ गए‍जनणवयों/ ुमय‍ुमय‍पर‍जारी‍ुरकार‍ऄजधुूचनाओं‍द्वारा‍जाकाु‍जनयंत्रण‍और‍ऄनुमेयता‍ु‍े ुंबंजधत‍जाजनयमों‍कज‍िाजुत‍दकया‍जाएगा। घ. ईंधन‍स्ट्टेिन‍जनम्नजलजखत‍जनयत्रं णों‍द्वारा‍जाजनयजमत‍ूोंगेः 1. ईंधन‍स्ट्टेिन‍न्यूनतम‍24 मीटर‍मागावजधकार‍की‍ुड़कों‍पर‍जस्ट्थत‍ूोंगे। 2. ईंधन‍स्ट्टेिनों‍के‍जलए‍भूखडं ‍का‍अकार‍न्यूनतम‍30 मीटर‍X 36 मीटर‍और‍ऄजधकतम‍ 33 मीटर‍X 45 मीटर‍ूजगा‍(अाश्यकता‍ऄनुुार‍ुीएनजी‍मुख्य‍स्ट्टेिन‍के‍जलए‍75 मीटर‍X 40 मी)। 3. ुड़क‍चौराूों‍की‍मागावजधकार‍लाआन‍ु‍ेभूखंड‍की‍न्यूनतम‍दरू ी‍आु‍प्रकार‍ूजगीः  30 मी‍ुे‍कम‍मागावजधकार‍ााली‍छजटी‍ुड़कों‍के‍जलए‍– 50 मी.  30 मी‍ऄथाा‍ऄजधक‍चौड़ाइ‍ााली‍ुड़कों‍के‍जलए‍– 100 मी.  भूखंडों‍का‍फ्रंट‍30 मी‍ुे‍कम‍नूीं‍ूजने‍चाजूए। ढ. ऄजधकतम‍उाँचाइः‍6 मी. च.‍क,नजपी/छतः‍ुेटब,क‍के‍भीतर‍ग्राईंड‍कारेज‍के‍बराबर। ‍ छ. ग,र-ज्ालनिील, ग,र-खतरनाक‍्ााुाजयक‍गजतजाजधयों‍के‍जलए‍ऄजधकतम‍10 एफएअर‍ऄनुमेय‍ू,, जज‍दक‍ ुमय-ुमय‍पर‍ुरकार‍द्वारा‍जनधावररत‍दकए‍गए‍पररातनव ‍िल्ु क/प्रभारों‍के‍भगु तान‍की‍ित‍व के‍ऄधीन‍ूजगा। ज.‍मौजूदा‍पेरजल‍पंपों‍के‍मामले‍म‍ें ्ााुाजयक‍गजतजाजध‍ूते ु‍ऄजधकतम‍10 एफएअर‍का‍प्रााधान‍केाल‍ईन‍ईंधन‍ स्ट्टेिनों/पेरजल‍पंपों‍के‍जलए‍ऄनुमेय‍ूजगा, जज‍ईपरजि ‍घ)‍i, ii और‍iii में‍ददए‍जनयंत्रणों‍के‍ऄनरूु प‍ूों‍तथा‍ ुमुजचत‍िुल्क/करों/दरूु पयजग‍ऄथवदडं ‍तथा‍ऄन्य‍प्रभारों‍के‍भुगतान‍की‍ित‍व पर‍ूजगा।222 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] झ.‍ुभी‍प्रकार‍के‍ुीएनजी‍ााूनों‍ुे‍बढ़ती‍मागं ‍कज‍पूरा‍करने‍के‍जलए‍ुीएनजी‍स्ट्टेिनों‍की‍जातरण‍क्षमता‍में‍पयावप्त‍ तौर‍पर‍ाृजद्ध‍की‍जानी‍चाजूए। ञ.‍जाजभन्न‍ईपयजग‍जजनों‍ऄथातव ्‍‍अााुीय, ्ााुाजयक, औद्यजजगक, पीएुपी‍ुुजाधाओं‍और‍ऄन्य‍क्षेत्रों‍की‍लअे ईट‍ यजजनाओं‍की‍त,यारी‍के‍ुमय, ईंधन‍स्ट्टेिन‍के‍स्ट्थान‍जनम्नजलजखत‍मानदंडों‍के‍ऄनुुार‍प्रदान‍दकए‍जाने‍चाजूएः ताजलका‍22.40 ईंधन‍स्ट्टेिन‍मानदडं क्र.ु.ं भजू म‍ईपयजग/ईपयजग‍पररुर मानदडं 1. अााुीय‍ईपयजग‍जजन कुल‍अााुीय‍क्षेत्र‍के‍150 ूक्े टेयर‍पर‍दज‍फ्यलू ‍स्ट्टेिन‍(एक‍ पेरजल‍पपं ‍+‍एक‍ुीएनजी‍स्ट्टेिन) 2. औद्यजजगक‍ईपयजग‍जजन कुल‍औद्यजजगक‍क्षेत्र‍के‍40 ूक्े टेयर‍पर‍दज‍फ्यलू ‍स्ट्टेिन‍(एक‍ पेरजल‍पपं ‍+‍एक‍ुीएनजी‍स्ट्टेिन) 3. फ्रेट‍कॉम्प्लेक्ु प्रत्येक‍में‍चार‍ईंधन‍स्ट्टेिन‍(दज‍पेरजल‍पंप‍+‍दज‍ुीएनजी‍ स्ट्टेिन) 4. जडजस्ट्रक‍ुेंटर प्रत्येक‍जडजस्ट्रक‍ुेंटर‍में‍चार‍फ्यूल‍स्ट्टेिन‍(दज‍पेरजल‍पंप‍+‍दज‍ ुीएनजी‍स्ट्टेिन) 5. कम्‍यजु नटी‍ुेंटर प्रत्येक‍ में‍ दज‍ फ्यलू ‍ स्ट्टेिन‍ (एक‍ पेरजल‍ पंप‍ +‍ और‍ एक‍ ुीएनजी‍स्ट्टेिन) 6. ुाावजजनक‍और‍ऄध-व ुाावजजनक‍ईपयजग‍जजन‍ प्रत्येक‍पीएुपी‍क्षेत्र‍म‍ें दज‍ईंधन‍स्ट्टेिन‍(एक‍पेरजल‍पंप‍+‍एक‍ ुीएनजी‍स्ट्टेिन)। 7. ुुरक्षा‍बल‍क,म्पु‍/‍पुजलु‍/‍ऄस्ट्पताल‍/‍ततृ ीयक‍ जनजी‍ईपयजग‍ूते ु/अाश्यकतानुुार। स्ट्ाास्ट््य‍देखभाल‍केंद्र‍/‍ुरकार ट.‍आलेजक्रक‍चार्मजग‍स्ट्टेिनों‍कज, जूां‍भी‍्ाूायव‍ूज, ईंधन‍स्ट्टेिनों‍के‍भीतर‍एक‍एकीकृत‍स्ट्थापना‍के‍रूप‍में‍ऄनुमजत‍दी‍ जाएगी। 22.12.1 पार्ककग‍मानक i. प्रत्येक‍ईपयजग‍पररुर‍में‍पार्ककग‍मानकों‍कज‍जनधावररत‍दकया‍गया‍ू।, ‍ूालााँदक, जूााँ‍भी‍आुे‍जनधावररत‍नूीं‍दकया‍गया‍ ू,, ाूां‍आुका‍जनम्नानुुार‍ऄनपु ालन‍दकया‍जाएगाः ताजलका‍22.41 कॉमन‍पार्दकगमानक क्र.ु.ं ईपयजग‍पररुर जनर्नमत‍क्षत्रे ‍का‍प्रजत‍100 ागमव ीटर‍ऄनमु ये ‍ुमतल्ु य‍कार‍स्ट्थान‍ (इुीएु)* 1. अााुीय ‍22.45‍टेबल‍देखे‍ 2. ्ााुाजयक 22.45‍टेबल‍देख े 3. औद्यजजगक 22.45‍टेबल‍देख े 4. ुरकारी 22.45‍टेबल‍देख े 5. ुाावजजनक‍और‍ऄध-व ुाावजजनक‍ 22.45‍टेबल‍देख े ुुजाधाएं[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 223 नजट: क. ऄजतररि ‍पार्ककग‍केाल‍भुगतान‍पर‍तथा‍ुाझा‍पार्ककग‍ुुजाधाओं‍के‍रूप‍में‍जनर्नमत‍दकए‍जा‍ुकते‍ूैं, जज‍ूर‍ ुमय‍जनता‍के‍जलए‍ुलु भ‍ूों। ख. कइ‍ईपयजगों‍ााल‍े पररुर‍के‍ुाथ‍एकीकृत‍यजजनाओं‍के‍मामले‍म,ें पार्ककग‍मानदडं ों‍कज‍प्रत्येक‍ईपयजग‍के‍ ऄनुपात‍में‍युजि ुगं त‍बनाया‍जा‍ुकता‍ू,, जब‍तक‍दक‍आुे‍ऄन्यथा‍जाजनर्ददष्ट‍नूीं‍दकया‍गया‍ूज‍(ईदाूरण‍के‍ जलए‍टीओडी‍यजजनाओं‍में)।‍यू‍ददजाप्रा‍‍की‍तकनीकी‍ुजमजत‍के‍ऄनुमजदन‍की‍ितव‍के‍ऄधीन‍ूजगा। ii. पार्ककग‍स्ट्थानों‍के‍प्रााधान‍के‍जलए, स्ट्थान‍मानक‍जनम्न‍ताजलका‍में‍ददए‍गए‍ऄनुुार‍ूोंगे। ताजलका‍22.42 कार‍पार्ककग‍के‍जलए‍स्ट्पुे ‍मानक क्र.ु.ं पार्ककग‍का‍प्रकार क्षत्रे ‍प्रजत‍इ.ुी.एु‍(ाग‍वमीटर) 1. खुली‍पार्ककग 23 2. काडव‍ग्राईंड‍फ्लजर 28 3. बेुमेंट 32 4. रैंप‍के‍ुाथ‍मल्टी-लेाल 30 5. जलफ्टों‍के‍ुाथ‍स्ट्ाचाजलत‍बुएस्ट्तरीय‍पार्ककग 16 iii. ईपयजग‍पररुरों‍में‍पार्ककग‍ईपरजि ‍मानकों‍के‍ऄनुुार‍भूखंड‍के‍भीतर‍प्रदान‍की‍जाएगी। iv. ऐुे‍मामलों‍म,ें जूां‍स्ट्ाीकृत‍यजजना‍के‍ुाथ‍भान‍(ूजटल‍कज‍छजड़कर)‍मौजूद‍/‍जनमाणव ाधीन‍ू,, और‍जूा‍ाँ भान‍की‍ यजजनाएाँ‍एमपीडी-2021 के‍ऄनुुार‍स्ट्ाीकृत‍ू,ैं ईपयजग‍दकए‍गए‍ऄजतररि ‍एफएअर‍के‍जलए‍पार्ककग‍ईपलब्ध‍कराइ‍ जानी‍चाजूए, और‍यू‍एमपीडी-2041 में‍जनर्ददष्ट‍पार्ककग‍मानकों‍के‍ऄनुुार‍ूजगा। v. ऄनुमजददत‍जजनल‍यजजना/लअे ईट‍यजजना‍के‍ऄनुुार, पार्ककग,‍क्षेत्रीय‍पाकव/ररज, मनजरंजनात्मक‍खुले‍स्ट्थान‍और‍ पाकों‍कज‍छजड़कर‍ुभी‍ईपयजग‍जजनज‍में‍ऄनुमेय‍गजतजाजधयों‍में‍ुे‍एक‍ू।, vi. ुमतुल्य‍कार‍स्ट्पेु‍(इुीएु)‍में‍ददए‍गए‍मानकों‍म‍ें ुभी‍प्रकार‍के‍ााूनों‍ऄथावत‍कार, स्ट्कूटर, ुाआदकल, ूल्के‍और‍ भारी‍्ााुाजयक‍ााून, बु‍अदद‍के‍जलए‍पार्ककग‍िाजमल‍ूजगी‍।‍स्ट्ट,जडया, िॉलपग‍मॉल, मल्टीप्लेक्ु‍ज,ुी‍बड़ी‍ पररयजजनाओं‍के‍जलए‍पार्ककग‍पयावप्तता‍जाारण/ऄ्ययन‍दकया‍जाना‍ईजचत‍ूजगा।‍ऄनुमजदन‍के‍जलए‍प्रस्ट्तुत‍की‍जान‍े ााली‍ड्रांआगों‍पर‍मजड-ाार‍पार्ककग‍स्ट्थान‍जचजननत‍दकए‍जान‍ेचाजूए। ताजलका‍22.43 पररयजजनाओं‍के‍जलए‍ुाकं ेजतक‍ऑन-ुाआट‍पार्ककग‍(इुीएु)‍अाश्यकताए*ाँ ुाधन ुाधन‍द्वारा‍ पररुचं रण‍ ुाधन‍द्वारा‍जातरण‍-‍ ुाधन‍द्वारा‍जातरण‍-‍प्रजत‍1 इुीएु‍मानक ुजूत‍क्षत्रे प्रजत‍1 इुीएु इुीएु‍(टीओडी‍स्ट्क‍ ीम)‍ (ाग‍वमीटर) कार‍/‍ट,क्ुी 1.00 23.00 0.60 0.60 2 व्ूीलुव 0.25 5.75 0.25 0.10 ुाआदकल 0.10 2.30 0.05 0.10 बुें‍/‍ुाझा‍ा,न 3.50 80.50 0.05 0.10 कमर्नियल‍ााून 3.50 80.50 0.05 0.10 कुल 1.00 इुीएु 1.00 इुीएु224 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] *ईपरजि ‍अंकड़े‍ुांकेजतक‍मात्र‍ू‍ैंऔर‍ये‍जभन्न-जभन्न‍मामले‍के‍अधार‍पर‍ऄनुकूजलत‍दकए‍जा‍ुकते‍ू।ैं‍ूालांदक, ुाआदकल‍पार्ककग‍का‍न्यूनतम‍ऄनुपात‍ऄजनाायव‍ू।, vii. ुाावजजनक‍पररून‍ऄजभगम्यता‍स्ट्तर‍(पीटीएएल)‍मान‍के‍ऄ्ययन‍के‍पररणामों‍के‍अधार‍पर, पार्ककग‍मानदडं ों‍कज‍ जनम्नजलजखत‍कटौजतयों‍द्वारा‍कम‍दकया‍जाएगा। ताजलका‍22.44 पार्ककग‍मानदडं ों‍म‍ेंपीटीएएल‍कटौती पार्ककग‍मानदडं ों‍म‍ेंकटौती‍% पीटीएएल‍स्ट्तर एक्ुुे ‍आंडक्े ु‍रेंज अााुीय कमर्नियल औद्यजजगक पीएुपी * 0 0 - 2 0 0 0 0 1 2 -3 0 0 0 0 2 3 - 5.5 10 5 5 10 3 5.5 - 7 20 10 10 20 4 7 - 8.5 20 20 20 20 5 8.5 - 12 20 20 20 30 6 12 - 20 20 30 30 30 7 20 - 30 30 30 30 30 8 30 और‍ईुुे‍उपर 30 30 30 30 viii. एमएलुीपी‍कटौती: यदद‍कजइ‍मल्टी-लेाल‍कार‍पार्ककग‍(एमएलुीपी)‍दकुी‍ुंपजि‍के‍500 मीटर‍के‍दायरे‍म‍ें जस्ट्थत‍ ू,, तज‍ईु‍ुंपजि‍के‍भीतर‍पार्ककग‍की‍अाश्यकता‍कज‍10% तक‍कम‍दकया‍जाएगा।‍एमएलुीपी‍कटौती‍अााुीय‍ ईपयजग/पररुर‍पर‍लाग‍ूनूीं‍ूजगी। ix. ुभी‍ईपयजग‍पररुरों‍ूते ‍ु इुीएु‍मानदडं ‍जनम्न‍ताजलका‍के‍ऄनुु ार‍ूोंग।े आन‍पार्ककग‍मानदडं ‍प्रााधानों‍पर‍ पीटीएएल‍तथा‍एमएलुीपी‍कटौजतयां‍लाग‍ूूोंगी। ताजलका‍22.45 न्यनू तम‍पार्ककग‍मानदडं ईपयजग‍जजन पार्ककग‍प्रााधान* कटौती पीटीएएल एमएलुीपी अााुीय‍पररुर ग्रुप‍ूाईलुग  इडब्ल्यूएु‍ /‍ पी एनपी ुेाा‍ कार्नमक‍ अााु‍ डीय‍ू का‍ अकारः‍ 40‍ाग‍व मीटर‍ ुे‍ कम‍ -‍ पार्ककग‍ 0.5 इुीएु‍ प्रजत‍ डीयू*  डीयू‍ का‍ अकारः‍ 40‍ ागव‍ मीटर‍ ु‍े 100‍ ाग‍व मीटर‍ -‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 225 पार्ककग‍ 1.0 इुीएु‍ प्रजत‍ डीयू*  डीयू‍ का‍ अकारः‍ 100‍ ागव‍ मीटर‍ ु‍े 200‍ ाग‍व मीटर‍ -‍ पार्ककग‍ 2.0 इुीएु‍ प्रजत‍ डीयू*  डीयू‍ का‍ अकारः‍ 200‍ ागव‍ मीटर‍ ु‍े ऄजधक‍ -‍ पार्ककग‍ 2.0 इुीएु‍ प्रजत‍ डीयू*‍ और‍ ऄजतररि ‍1.0‍ इुीएु‍ प्रजत‍ 100‍ ाग‍व मीटर‍ ऄथाा‍ ईुका‍भाग *‍डीय‍ू का‍अकारः‍ लप्लथ‍क्षत्रे फल ुरकारी‍अााुीय‍ पररयजजनाओं‍ के‍ मामल‍े म‍ें पार्ककग‍ मानदडं ‍ जीपीअरए‍ कालजजनयों‍ के‍ मामल‍े म‍ें लाग‍ू मानदडं ों‍ के‍ ऄनुु ार‍ूोंग।े ‍ स्ट्टूजडयज‍ऄपाटवमेंट  जनर्नमत‍ क्षेत्र‍ पी एनपी का‍ 1.0 इुीएु‍ /‍ 100 एम2  बेुमेंट‍ का‍ यदद‍ जनमावण‍ दकया‍ जाता‍ ू,,‍और‍केाल‍ पार्ककग‍ के‍226 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] जलए‍ईपयजग‍ दकया‍ गया‍ ू,, तज‍ ईपयजजगता‍ और‍ ुेााओं‍ कज‍एफएअर‍ में‍ िाजमल‍ नूीं‍ दकया‍ जाएगा। प्लॉटेड‍ूाईलुग  250 ुे‍ एनपी एनपी 300 ागवमीटर‍ अकार‍ के‍भूखंडों‍ में‍2 ुमतुल्य‍ कार‍ स्ट्थान‍ (इुीएु )  300 एनपी एनपी ागवमीटर‍ ुे‍ऄजधक‍ के‍भूखंडों‍ म ें 1 इुीएु‍ प्रत्यके ‍ 100 ागवमीटर‍ जनर्नमत‍ क्षेत्र‍ के‍ जलए, बिते‍दक‍ यदद‍ दकुी‍ भूखंड‍ म‍ें ईपयुवि ‍ ईजल्लजख त पार्ककग‍ मानदंडों‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 227 के‍ ुाथ‍ ऄनुमेय‍ कारेज‍ और‍ एफएअ र‍ प्राप्त‍ नूीं‍ दकया‍ गया‍ ू,, तज‍ पूावाती‍ श्रेणी‍ के‍ पार्ककग‍ मानदंडों‍ कज‍ ऄनुमजत‍ दी‍ जाएगी। ूजस्ट्टल/धमविाला‍ या‍ आुके‍ ुमकक्ष/गेस्ट्ट‍ ूाईु/‍  जनर्नमत‍ क्षेत्र‍ पी एनपी का‍ 0.5 लजलजग‍एडं ‍बजर्मडग‍ूाईु/ुराय इुीएु‍ /‍ 100 एम2।  ये‍ मानक‍ जमजश्रत‍ ईपयजग‍ जाजनयमों‍ के‍ ऄंतगतव , ऄजतजथ-गृू‍ के‍जलए‍लाग‍ू नूीं‍ूोंगे। जनम्न‍घनत्ा‍अााुीय‍भूखंड‍(एलडीअरपी)  0.4 ुे‍ 2 एनपी एनपी ूक्े टेयर‍ के‍ भूखंडों‍ ूते ‍ु न्यूनतम‍ 50% भूखंड‍ क्षेत्र‍ कज‍ ुॉफ्ट‍पार्ककग‍ और‍ भ-ू दश्ृ यांकन‍ के‍ जलए‍ छजड़ा‍ जाएगा।  2 ूक्े टेयर‍ु‍े ऄजधक‍ के‍228 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] भूखंडों‍ ूते ‍ु जज‍ न्यूनतम‍ 18 मी.‍ चौड़ाइ‍ााली‍ ुड़कों‍ पर‍ ऄाजस्ट्थत‍ ू,ैं न्यूनतम‍ 50% भूखंड‍ क्षेत्र‍ कज‍ ुॉफ्ट‍पार्ककग‍ के‍जलए‍छजड़ा‍ जाएगा,‍ ऄजधकतम‍ 25%‍ भूखंड‍ क्षेत्र‍ कज‍ भू- दश्ृ यांकन‍ के‍ जलए‍ और‍ ऄजधकतम‍ 25%‍ भूखंड‍ क्षेत्र‍ कज‍ ुमारजूों‍ /‍ भान‍ईद्देश्यों‍ के‍जलए‍छजड़ा‍ जाएगा। राज्य‍भान‍/‍राज्य‍ऄजतजथ‍गृू जनर्नमत‍क्षेत्र‍का‍ एनपी एनपी 1.0 इुीएु‍/‍ 100 एम2 दकफायती‍ुाावजजनक‍दकराया‍अााु‍(एपीअरएच)‍ जनर्नमत‍क्षेत्र‍का‍ पी एनपी /‍दकफायती‍दकराया‍अााु‍पररुर‍(एअरएचुी) 0.5 इुीएु‍/‍ 100 ागव‍मीटर स्ट्लम‍पुनाावु‍यजजना  जनर्नमत‍ क्षेत्र‍ पी एनपी‍ के‍प्रजत‍100 ागवमीटर‍ म‍ें 0.5 इुीएु‍ पर‍अााुीय‍ घटक‍ कज, जूां‍ कूीं‍ अाश्यक‍ूज, जिजथल‍दकया‍ जा‍ुकता‍ू।,  पाररश्रजमक‍ ईद्देश्यों‍ के‍ जलए‍ पार्ककग‍ प्राुंजगक‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 229 भूजम‍ईपयजग‍ के‍जलए‍यथा‍ मान्य‍ ऄनुुार‍लाग‍ू ूजगी। र,न‍बुेरा  कजइ‍ एनपी एनपी ऄजनाायव‍ पार्ककग‍प्रदान‍ नूीं‍ की‍ जाएगी जादेिी‍जमिन -- एनपी एनपी ऄथ्व ास्ट्था‍– ईद्यजग, ्ापार‍और‍ााजणज्य ुुजाधा‍ िॉलपग‍ ुेंटर‍ /‍ स्ट्थानीय‍ िॉलपग‍ ुेंटर‍ /‍ जनर्नमत‍ क्षेत्र‍ का‍ पी पी स्ट्थानीय‍स्ट्तर‍के‍ााजणजज्यक‍क्षत्रे 2.0 इुीएु‍ /‍ 100 ागव‍मीटर ुर्नाु‍माकेट जनर्नमत‍क्षेत्र‍का‍ पी पी 2.0 इुीएु‍/‍ 100 ागव‍मीटर कम्‍यजु नटी‍ुेंटर‍/‍गर, -श्रेणीबद्ध‍ााजणजज्यक‍केंद्र जनर्नमत‍क्षेत्र‍का‍ पी पी 3.0 इुीएु‍/‍ 100 ागव‍मीटर जडजस्ट्रक‍ुेंटर‍/‍ईप-केंद्रीय‍्ापार‍जजला‍/‍ईप-िूर‍ जनर्नमत‍क्षेत्र‍का‍ पी पी स्ट्तर‍के‍ााजणजज्यक‍क्षेत्र 3.0 इुीएु‍/‍ 100 ागव‍मीटर कमर्नियल‍ प्लॉट:‍ ररटेल‍ एडं ‍ कॉमुव‍ मेरजपॉजलटन‍ जनर्नमत‍क्षेत्र‍का‍ पी पी जुटी‍ ुेंटर‍ ऄथावत‍् कनॉट‍ प्लेु‍ और‍ ईुका‍ 3.0 इुीएु‍/‍ एक्ुटेंिन, फायर‍जब्रगडे ‍लेन‍और‍जनपथ‍लेन 100 ागव‍मीटर कजइ‍ऄन्य‍कमर्नियल‍केन्द्र, जजुमें‍िाजमल‍ू-ैं जनर्नमत‍क्षेत्र‍का‍ पी पी 2.0 इुीएु‍/‍ i. रेलाे‍/‍एमअरटीएु‍स्ट्टेिनों‍/‍अइएुबीटी‍के‍ ुाथ‍/‍भीतर‍कमर्नियल‍घटक 100 ागव‍मीटर ii. अुफ‍ ऄली‍ रजड‍ (ददल्ली‍ गेट‍ -‍ ऄजमेरी‍ गेट‍ यजजना‍में‍कमर्नियल‍स्ट्रीप‍के‍रूप‍म‍ें ददखाया‍गया‍ क्षेत्र)) एकीकृत‍माल‍पररुर‍/‍थजक‍बाजार जनर्नमत‍क्षेत्र‍का‍ पी पी 3.0 इुीएु‍/‍ 100 ागव‍मीटर गजदाम‍प्लॉट 300 पी पी ागवमीटर‍तक‍ के‍भूखंडों‍के‍ मामले‍में‍ ईपलब्ध‍ कराइ‍जाने‍230 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ााली‍कॉमन‍ पार्ककग 300 ागव‍ मीटर‍ुे‍ उपर‍के‍ भूखंडों‍के‍ जलए‍फि‍व क्षत्रे का‍3 इुीएु‍/‍ 100 ागव‍ मीटर ूजटल  जनर्नमत‍क्षेत्र‍ पी एनपी का‍2.0 इुीएु‍/‍ 100 ागव‍ मीटर  ऐुे‍ूजटलों‍के‍ ुंबंध‍में‍जूां‍ भान-जनमावण‍ यजजनाएं‍ 27.1.2006 ुे‍पूल‍े मंजूर‍ की‍गइ‍ू,ैं ाूााँ‍100 ागव‍ मीटर‍के‍ जनर्नमत‍क्षेत्र‍ के‍जलए‍3 इुीएु‍का‍ पार्ककग‍ मानक‍केाल‍ ऄजतररि ‍ एफएअर‍ूते ु‍ लाग‍ूूजगा, जज‍एमपीडी- 2021 में‍ ुंिजधन‍के‍ पररणामस्ट्ारू प‍प्राप्त‍दकया‍ जाएगा।‍ऐुे‍ ूजटलों‍के‍ ुंबंध‍में‍जूां‍ 27.1.2006 कज‍या‍ईुके‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 231 बाद‍भान- जनमावण‍ यजजनाएं‍ मंजूर‍की‍गइ‍ ू,ैं ाूााँ‍100 ागव‍मीटर‍के‍ जनर्नमत‍क्षेत्र‍ के‍जलए‍3 इुीएु‍का‍ पार्ककग‍ मानक‍पूरे‍ भूखंड‍पर‍ लाग‍ूूजगा। ुर्नाु‍ऄपाटवमेंट जनर्नमत‍क्षेत्र‍का‍ पी एनपी 2.0 इुीएु‍/‍ 100 ागव‍मीटर मजटल  जनर्नमत‍ क्षेत्र‍ पी पी का‍ 3.0 इुीएु‍ /‍ 100 ाग‍व मीटर  ुभी‍ऄजतजथ‍ पार्ककग‍ की‍ पूर्नत‍ मॉटेल‍ पररुर‍ के‍ भीतर‍ूी‍की‍ जानी‍ चाजूए। जाजनमावण, ुेाा‍और‍मरम्मत‍ईद्यजग जनर्नमत‍क्षेत्र‍का‍ पी पी 2.0 इुीएु‍/‍ 100 ागव‍मीटर जजला‍न्यायालय जनर्नमत‍क्षेत्र‍का‍ पी पी 2.0 इुीएु‍/‍ 100 ागव‍मीटर एकीकृत‍कायावलय‍पररुर,‍ुरकारी‍कायावलय‍(केंद्र/‍ जनर्नमत‍क्षेत्र‍का‍ पी पी 1.0 इुीएु‍/‍ राज्य‍ुरकार/‍स्ट्थानीय‍जनकाय) 100 ागव‍मीटर ुामाजजक‍ऄाुरं चना प्ले‍स्ट्कूल, कजलचग‍ुेंटर, कंप्यूटर-‍प्रजिक्षण‍ुंस्ट्थान, जनर्नमत‍क्षेत्र‍का‍ पी पी 1.33 इुीएु‍/‍ दफजजकल‍एजुकेिन‍ुेंटर‍अदद। 100 ागव‍मीटर नुवरी‍स्ट्कूल जनर्नमत‍क्षेत्र‍का‍ एनपी एनपी 1.33 इुीएु‍/‍232 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 100 ागव‍मीटर प्राथजमक‍स्ट्कूल जनर्नमत‍क्षेत्र‍का‍ एनपी एनपी 1.33 इुीएु‍/‍ 100 ागव‍मीटर ुीजनयर‍ुेकेंडरी‍स्ट्कूल,‍एकीकृत‍स्ट्कूल जनर्नमत‍क्षेत्र‍का‍ एनपी एनपी 2.0 इुीएु‍/‍ 100 ागव‍मीटर मानजुक‍रूप‍ु‍े जाकलांगों‍के‍जलए‍स्ट्कूल, दद्ांग‍ जनर्नमत‍क्षेत्र‍का‍ एनपी एनपी ्जि यों‍के‍जलए‍स्ट्कूल 1.0 इुीएु‍/‍ 100 ागव‍मीटर (नइ) ऄनुुंधान‍और‍जाकाु‍केंद्र जनर्नमत‍क्षेत्र‍का‍ पी पी 1.0 इुीएु‍/‍ 100 ागव‍मीटर ुंस्ट्थान, फजरेंजुक‍जाज्ञान‍प्रयजगिाला जनर्नमत‍क्षेत्र‍का‍ पी पी 1.33 इुीएु‍/‍ 100 ागव‍मीटर ्ााुाजयक‍प्रजिक्षण‍केंद्र, अइटीअइ‍/‍पॉजलटेदक्नक‍ जनर्नमत‍क्षेत्र‍का‍ पी पी 1.0 इुीएु‍/‍ /‍ कौिल‍ केंद्र, प्रबंधन‍ ुंस्ट्थान, कजलचग‍ ुेंटर, प्रजिक्षण‍ुस्ट्ं थान अदद 100 ागव‍मीटर ुामान्य‍कॉलेज,‍प्रजफेिनल‍कॉलेज‍अदद जनर्नमत‍क्षेत्र‍का‍ पी पी 1.0 इुीएु‍/‍ 100 ागव‍मीटर जािजाद्यालय‍पररुर‍ जनर्नमत‍क्षेत्र‍का‍ पी पी 1.0 इुीएु‍/‍ 100 ागव‍मीटर औीधालय,‍क्लीजनक,‍न,दाजनक‍ुुजाधा,‍प्रुूजत‍गृू,‍ जनर्नमत‍क्षेत्र‍का‍ पी‍ एनपी नर्मुग‍ूजम,‍ऄस्ट्पताल,‍तृतीयक‍स्ट्ाास्ट््य‍केंद्र‍अदद 2.0 इुीएु‍/‍ 100 ागव‍मीटर प,रामेजडकल‍ुंस्ट्थान जनर्नमत‍क्षेत्र‍का‍ पी पी 1.0 इुीएु‍/‍ 100 ागव‍मीटर ुरकारी‍ऄस्ट्पताल,‍मेजडकल‍कॉलेज जनर्नमत‍क्षेत्र‍का‍ पी पी 1.0 इुीएु‍/‍ 100 ागव‍मीटर पालतू‍जानारों‍और‍पजक्षयों‍के‍जलए‍औीधालय जनर्नमत‍क्षेत्र‍का‍ एनपी एनपी पालतू‍जानारों‍और‍पजक्षयों‍के‍जलए‍पिु‍जचदकत्ुा‍ 1.0 इुीएु‍/‍ ऄस्ट्पताल‍ 100 ागव‍मीटर पिु‍जचदकत्ुा‍ुंस्ट्थान प्रिाुजनक‍जनर्नमत‍ एनपी एनपी[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 233 क्षेत्र‍का‍1.0 इुीएु‍/‍100 ागव‍मीटर बुए-ुुजाधा‍प्लॉट जनर्नमत‍क्षेत्र‍का‍ पी एनपी 1.0 इुीएु‍/‍ 100 ागव‍मीटर ाृद्धाश्रम‍/‍प्रौढ़‍जिक्षा‍केंद्र‍/‍ऄनाथालय‍/‍जचल्ड्रन’ु‍ जनर्नमत‍क्षेत्र‍का‍ पी पी ुेंटर 1.8 इुीएु‍/‍ 100 ागव‍मीटर दद्ांग‍्जि यों‍/‍मानजुक‍रूप‍ुे‍जाकलांगों‍के‍ जनर्नमत‍क्षेत्र‍का‍ एनपी एनपी जलए‍अााुीय‍देखभाल‍केंद्र 1.8 इुीएु‍/‍ 100 ागव‍मीटर जािाल‍धार्नमक‍केंद्र जनर्नमत‍क्षेत्र‍का‍ पी पी 2.0 इुीएु‍/‍ 100 ागव‍मीटर बैंक्वेट‍ूॉल जनर्नमत‍क्षेत्र‍का‍ एनपी एनपी 6.0 इुीएु‍/‍ 100 ागव‍मीटर दफटनेु‍ुेंटर जनर्नमत‍क्षेत्र‍का‍ एनपी एनपी 3.0 इुीएु‍/‍ 100 ागव‍मीटर बुएईद्देिीय‍ुामुदाजयक‍ूॉल, ुामाजजक-ुांस्ट्कृजतक‍ जनर्नमत‍क्षेत्र‍का‍ पी पी 2.0 इुीएु‍/‍ ुंस्ट्थान, ुांस्ट्कृजतक‍और‍ुूचना‍केंद्र 100 ागव‍मीटर मनजरंजन‍ क्लब, कन्ाेंिन‍ ुुजाधाओं, ुंग्रूालय, जनर्नमत‍क्षेत्र‍का‍ एनपी पी ुाावजजनक‍/‍ऄन्य‍पस्ट्ु तकालय 2.0 इुीएु‍/‍ 100 ागव‍मीटर ुामाजजक-ुांस्ट्कृजतक‍केंद्र, जाज्ञान‍केंद्र, तारामंडल,  ुांजाजधक‍ पी पी मंजूरी‍के‍ प्रदिवनी-ुू-मेला‍ग्राईंड, ऄंतरावष्ट्रीय‍कन्ाेंिन‍ुेंटर,‍ ऄधीन अदद  जनर्नमत‍क्षेत्र‍ का‍2.0 इुीएु‍/ 100 ागव‍ मीटर पुजलु‍चौकी जनर्नमत‍क्षेत्र‍का‍ एनपी एनपी 1.33 इुीएु‍/‍ 100 ागव‍मीटर पुजलु‍पजस्ट्ट‍/‍स्ट्टेिन, फायर‍पजस्ट्ट‍/‍स्ट्टेिन, पुजलु‍ जनर्नमत‍क्षेत्र‍का‍2 पी लाआन, जजला‍ पुजलु‍ कायावलय, जजला‍ अपदा‍ इुीएु‍/‍100234 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] प्रबंधन, जजला‍ जेल, पुजलु‍ /‍ ऄजग्निमन‍ प्रजिक्षण‍ ागव‍मीटर ुंस्ट्थान‍ /‍ कॉलेज, पुजलु‍ जिजार, ुुरक्षा‍ जिजार, अपदा‍प्रबधं न‍केंद्र, ुुरक्षा स्ट्थापनाएं प्रमुख‍ डाकघर, दरू ुंचार‍ ुुजाधाओं, जडजजटल‍ जनर्नमत‍क्षेत्र‍का‍ पी पी बुजनयादी‍ुुजाधाएाँ 1.33 इुीएु‍/‍ 100 ागव‍मीटर मीजडया‍/‍रेजडयज‍ुेााएं, ईपग्रू‍और‍दरू ुंचार‍केंद्र, जनर्नमत‍क्षेत्र‍का‍ पी पी 1.33 इुीएु‍/‍ ाेधिाला‍ और‍ मौुम‍ कायावलय, मीजडया‍ और‍ 100 ागव‍मीटर ुमाचार‍एजेंुी, जडजजटल‍ऄाुंरचना‍ुुजाधाएाँ ग्रीन‍और‍मनजरंजन‍क्षत्रे 3.5 ूक्े टेयर‍ुे‍उपर‍पाकव‍के‍जलए-‍जुटी‍पाकव, जडजस्ट्रक‍पाकव‍ अाश्यकतानुुार‍जाजभन्न‍स्ट्थानों‍पर एनपी एनपी और‍ुामुदाजयक‍पाकव 25 ु े40 इुीएु‍के‍ुमूू‍में‍पार्ककग‍ प्रदान‍की‍जा‍ुकती‍ू।, िूर‍ बुएईद्देिीय‍ मद, ान, जजला‍ बुएईद्देिीय‍ म,दान‍ और‍ कुल‍क्षेत्र‍का‍न्यूनतम 50% ुॉफ्ट‍ ुामुदाजयक‍बुएईद्देिीय‍म,दान पार्ककग‍के‍ऄधीन‍ूजगा। मनजरंजन‍पाकव‍/‍थीम‍अधाररत 100 कारों‍के‍जलए‍न्यूनतम‍पार्ककग‍ एनपी एनपी प्रदान‍ करने‍ ूते ु‍ ऄनुबंध‍ के‍ ुाथ‍ जनर्नमत‍क्षेत्र‍का‍3 इुीएु‍/‍100 ागवमीटर। ज,ा‍जाजाधता‍पाकव अाश्यकतानुुार‍जाजभन्न‍स्ट्थानों‍पर‍ एनपी एनपी 20 ुे‍25 इुीएु‍के‍लॉट‍म‍ेंपार्ककग‍ प्रदान‍की‍जा‍ुकती‍ू।, खेल‍ुुजाधाएाँ जनर्नमत‍क्षेत्र‍का‍2 इुीएु‍/‍100 ागव‍ पी पी मीटर ऄन्य‍ईपयजग‍पररुर रांजजट‍स्ट्टेिनों‍में‍ुंपजि‍जाकाु ााजणजज्यक‍घटक‍के‍जनर्नमत‍क्षत्रे ‍का‍ पी पी 1.0 इुीएु‍/‍100 ागव‍मीटर ऄस्ट्थायी‍जुनेमा जनर्नमत‍क्षेत्र‍का‍3.0 इुीएु‍/‍100 पी पी ागव‍मीटर अइएुबीटी‍के‍भीतर‍ूजटल‍/‍यात्री‍अााु जनर्नमत‍क्षेत्र‍का‍2 इुीएु‍प्रजत‍100 पी पी ागवमीटर नजट- * ुभी‍ईपयजग‍पररुरों‍म,ें ईपरजि ‍मानकों‍और‍लाग‍ूकटौती‍के‍अधार‍पर‍पार्ककग‍भूखंड‍के‍भीतर‍प्रदान‍की‍जाएगी। 22.13 ईपयजजगताए ाँ 22.13.1 जल‍अपर्नू त‍और‍स्ट्ाच्छता[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 235 ताजलका‍22.46 जल‍अपर्नू त‍और‍स्ट्ाच्छता प्रजत‍यजू नट‍क्षत्रे फल‍ क्र.ु.ं ईपयजजगताए ाँ ु.ं (ूक्े टेयर) ुीाेज‍पंलपग‍स्ट्टेिन अाश्यकता‍के‍ऄनुुार बूस्ट्टर‍स्ट्टेिन‍और‍ओएचटी‍के‍ुाथ‍ 10,000 तक‍स्ट्थानीय‍स्ट्तर‍की‍ 1 भूजमगत‍पानी‍की‍टंकी जनुंख्या स्ट्थानीय‍स्ट्तर‍पर‍ऄपजिष्ट‍जल‍ईपचार‍की‍ ुुजाधा 5,00,000 तक‍ईप-िूर‍स्ट्तर‍ ुीाेज‍पंलपग‍स्ट्टेिन अाश्यकता‍के‍ऄनुुार 2 की‍जनुंख्या ऄपजिष्ट‍जल‍ईपचार‍की‍ुुजाधा ुीाेज‍पंलपग‍स्ट्टेिन 3 िूरी‍स्ट्तर‍जनुंख्या 20,00,000 अाश्यकता‍के‍ऄनुुार ुीारेज‍रीटमेंट‍प्लांट‍(180 एमएलडी) ताजलका 22.47 जल‍अपर्नू त‍और‍स्ट्ाच्छता‍के‍जलए‍क्षत्रे ‍की‍अाश्यकता भजू म‍की‍अाश्यकता‍ क्र.ु.ं ईपयजजगता क्षमता (ागमव ीटर) एुटीपी‍(एुपीएु‍और‍इपीएु‍के‍ुाथ)‍-‍5 650 ागव‍मी.‍/‍ 1 एमजीडी‍(22.7 एमएलडी)‍तक‍की‍क्षमता एमएलडी ुीाेज‍रीटमेंट‍प्लांट‍ एुटीपी‍(एुपीएु‍और‍इपीएु‍के‍ुाथ)‍-‍5 1,100 2 (एुटीपी) एमजीडी‍(22.7 एमएलडी)‍ुे‍ऄजधक‍क्षमता ागव‍मी.‍/‍एमएलडी 3 ुीाेज‍पलम्पग‍स्ट्टेिन‍(एुपीएु) 50 ागव‍मी. 4 एफ्लुएंट‍पंलपग‍स्ट्टेिन‍(इपीएु) 50 ागव‍मी. 5 जल‍ईपचार‍ुंयंत्र‍ डब्ल्यूटीपी‍– 80 एमजीडी‍(363 एमएलडी) 300 ागव‍मी./एमएलडी 6 (डब्ल्यूटीपी) डब्ल्यूटीपी‍– 40 एमजीडी‍(182 एमएलडी) 400 ागव‍मी./एमएलडी 7 5 एमएल‍क्षमता 700 एुक्यू/एमएल बूस्ट्टर‍पंलपग‍स्ट्टेिनों‍के‍ुाथ‍ 8 भूजमगत‍जलािय 50 एमएल‍क्षमता 600 एुक्यू/एमएल 22.13.2 ठजु‍ऄपजिष्ट‍प्रबधं न ताजलका 22.48 ठजु‍ऄपजिष्ट‍प्रबधं न के‍जलए‍क्षत्रे ‍की‍अाश्यकता प्रजत‍यजू नट‍क्षत्रे ‍ क्र.ु.ं ईपयजजगताएाँ‍(क्षमता) ु.ं (ागमव ीटर)236 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 10,000 तक‍स्ट्थानीय‍ ईपयजजगता‍ााूनों‍के‍ऄपजिष्ट‍और‍पार्ककग‍के‍ 1 1 200 स्ट्तर‍की‍जनुंख्या ऄलगाा‍के‍जलए‍क्षेत्र‍(पूल:े‍ढलाा) ईप-िूरी‍स्ट्तर‍की‍ ुामग्री‍पुनप्रावजप्त‍ुुजाधा‍(ऄध-व स्ट्ाचाजलत):‍ 2 जनुंख्या 1 6,000 - 8,000 200 टीपीडी 5,00,000 िूरी‍स्ट्तर‍की‍जनुंख्या‍ ुामग्री‍पुनप्रावजप्त‍ुुजाधा‍(स्ट्ाचाजलत):> 1@ > 10,000 - 3 20,00,000 10,000 टीपीडी 20,00,000 20,000 रटप्पणी:‍एमअरएफ‍(ुामग्री‍पुनःप्राजप्त‍ुुजाधा)‍एुबीएम‍ददिाजनदेिों‍के‍ऄनुुार 22.13.3 जबजली ताजलका‍22.49 जबजली‍के‍जलए‍क्षत्रे ‍की‍अाश्यकता क्र.ु.ं स्ट्तर ईपयजजगता ु.ं प्रजत‍यजू नट‍क्षत्रे ‍(ागमव ीटर) 1 10,000 तक‍स्ट्थानीय‍स्ट्तर‍की‍जनुंख्या आलेजक्रक‍ुब‍स्ट्टेिन‍11 के.ाी. 1 40 2 ुामुदाजयक‍स्ट्तर‍की‍जनुख्ं या 1,00,000 आलेजक्रक‍ुब‍स्ट्टेिन‍66 के.ाी. 2 2,500-4,000 ईप-िूरी‍स्ट्तर‍की‍जनुंख्या 3 आलेजक्रक‍ुब‍स्ट्टेिन‍220 के.ाी. 1 7,000-10,000 5,00,000 4 िूरी‍स्ट्तर‍की‍जनुंख्या‍20,00,000 आलेजक्रक‍ुब‍स्ट्टेिन‍400 के.ाी. 1 40,000 22.13.4 ‍ूाइ‍टेंिन‍(एचटी)‍लाआन‍बफर ताजलका‍22.50 ूाइ‍टेंिन‍(एचटी)‍लाआन‍ु‍ेबफर क्र.ु.ं ईपयजजगता ाजल्टेज न्यनू तम‍उंचाइ‍(ग्राईंड‍क्लीयरेंु) मागाजव धकार‍अाश्यकता 1 765 के.ाी. 12.1 मी. 67 मी. 2 एचटी‍लाआन‍बफर 400 के.ाी. 8.8 मी. 52 मी. 3 220 के.ाी. 7 मी. 35 मी. 22.14 ुरकारी क.‍ईपयजग‍पररुर‍एा‍ंपररभाीाए ाँ ताजलका 22.51 ईपयजग‍पररुर‍एा‍ंपररभाीा - ुरकारी क्र.ु.ं ईपयजग‍पररुर‍/‍श्रणे ी पररभाीा राष्ट्रपजत‍भान‍और‍ 1 राष्ट्रपजत‍भान‍और‍ुंुद‍भान ुंुद‍भान केंद्रीय‍/‍राज्य‍/‍स्ट्थानीय‍ुरकारी‍जाभागों‍/‍एजेंजुयों‍के‍कायावलय‍के‍जलए‍ईपयजग‍ 2 ुरकारी‍कायावलय दकए‍जाने‍ााले‍पररुर।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 237 केंद्र, राज्य, स्ट्थानीय‍ुरकारी‍जाभागों‍/‍एजेंजुयों‍और‍ुाावजजनक‍ईपक्रमों‍के‍ एकीकृत‍कायावलय‍ 3 कायावलयों‍के‍जलए‍पररुर‍/‍कायावलय‍पररुर।‍आन‍पररुरों‍में‍एकल‍/‍एकाजधक‍ पररुर जाभागों‍/‍एजेंजुयों‍के‍कायावलय‍िाजमल‍ूज‍ुकते‍ू।ैं जजला‍न्यायालय, न्यायपाजलका‍के‍कायावलयों‍और‍ाकीलों‍के‍चैंबर‍ज,ुी‍ुंबंजधत‍गजतजाजधयों‍के‍जलए‍ 4 परराार‍न्यायालय, पररुर‍/‍न्यायालय‍पररुर‍का‍ईपयजग‍दकया‍जाता‍ू।, अदद। ुरकारी‍भूजम‍ ुरकारी‍भूजम‍के‍मापदडं ‍(कम‍ईपयजग‍दकया‍जाए)‍ऄनुमजददत‍लअे ईट/यजजना‍के‍ 5 (ऄजनधावररत‍ईपयजग) ऄनुुार‍ूोंग,े जजुके‍जलए‍जाकाु‍जनयंत्रण‍ुंबंजधत‍ईपयजग‍पररुरों‍के‍ऄनुुार‍ूोंगे। ख. ऄनमु ये ‍गजतजाजधया ं ताजलका‍22.52 ईपयजग‍पररुर‍एा‍ंऄनमु ये ‍गजतजाजधया ं ईपयजग‍जजन जी2‍(ुरकार) 1 2 ईपयजग‍पररुर क्र.ु.ं जजला‍न्यायालय, परराार‍ ुरकारी‍कायालव य‍/‍ुााजव जनक‍ईपक्रम,‍ ऄनमु ये ‍गजतजाजधया ं न्यायालय, अदद। एकीकृत‍कायालव य‍पररुर 1 न्यायालय  2 ुरकारी‍कायावलय  ऄजधकतम‍अााुीय‍एफएअर   3 5% 4 डाक‍घर   5 कैंटीन‍/‍क,फेटेररया   6 पुजलु‍पजस्ट्ट   7 फायर‍पजस्ट्ट  8 रेस्ट्टजरेंट  238 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 9 खुदरा‍दकु ान‍   10 पुस्ट्तकालय   11 औीधालय   12 प्रिाुजनक‍कायावलय  13 बैंक‍और‍ए.टी.एम.   14 ाकीलों‍के‍चैंबर  15 कायावलय   16 जडजजटल‍आन्फ्रास्ट्रक्चर‍ुुजाधा‍   जजम‍/‍यजग‍/‍्यान‍केंद्र‍(नॉन-‍   17 कमर्नियल) 18 क्रेच‍/‍चाआल्ड‍केयर‍ुेंटर   ग. जाकाु‍जनयत्रं ण‍मानदडं ताजलका‍22.53 ुरकारी‍कायालव य ऄजधकतम‍ न्यनू तम‍ प्लॉट‍ उाँचाइ क्र.ु.ं ईपयजग‍पररुर ग्राईंड‍ एफएअर मागाजव धकार‍ क्षत्रे (मी.) कारेज (मी.) जजला‍न्यायालय, 1 परराार‍न्यायालय, एएअइ, डीएफएु‍ और‍ ऄन्य‍ अदद। 1 ुांजाजधक‍जनकायों‍ुे‍ऄनापजि‍ 50% 300 18 2 ुरकारी‍कायालव य ूक्े टेयर‍ की‍ित‍व पर‍कजइ‍उाँचाइ‍प्रजतबधं ‍ नूीं। एकीकृत‍कायालव य‍ 3 पररुर नजट  केाल‍ुभी‍नए‍अांटनों‍के‍जलए।‍पूल‍े ुे‍ूी‍अांरटत‍भूजम‍आु‍प्रााधान‍के‍तूत‍िाजमल‍नूीं‍ू।,  जजनल‍जाकाु‍यजजनाओं‍म‍ें ददए‍गए‍ऄन्य‍प्रााधानों‍के‍ुाथ, जजन‍ओ‍म‍ेंऔर‍जजन‍ुी‍और‍जजन‍डी‍के‍बंग्ला‍क्षेत्र‍ में‍ऄाजस्ट्थत‍ईपयजग‍पररुरों‍ूते ु‍ऄजधकतम‍एफएअर‍200 ूजगा। ऄन्य‍जनयत्रं ण i. अााुीय‍ईपयजग‍-‍अााुीय‍गजतजाजधयों‍के‍जलए‍ऄजधकतम‍कुल‍5% ऄनुमेय‍एफएअर‍का‍ ईपयजग‍दकया‍जा‍ुकता‍ू।, ii. पुनर्नाकाु‍के‍मामले‍म‍ें कज‍अर्नथक‍रूप‍ुे‍ुंभा‍बनान‍े के‍जलए‍कमर्नियल‍ईपयजग‍ूते ु‍कुल‍ ऄनुमेय‍एफएअर‍का‍10% का‍ईपयजग।‍यू‍भूजम-स्ट्ााजमत्ा‍एजेंुी‍और‍ुंबंजधत‍स्ट्थानीय‍ जनकाय‍के‍ऄनुमजदन‍की‍ितव‍के‍ऄधीन‍ूजगा। iii. ााजणजज्यक‍कायावलयों‍कज‍कुल‍फिव‍क्षेत्र‍का 10% तक‍ुीजमत‍दकया‍जाना‍ू।,[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 239 iv. ुरकारी‍भूजम‍के‍मानदंड‍(कम‍ईपयजग‍दकया‍जाए)‍ऄनुमजददत‍लअे ईट/यजजना‍के‍ऄनुुार‍ ूोंगे, जजुके‍जलए‍जाकाु‍जनयत्रं ण‍ुंबंजधत‍ईपयजग‍पररुरों‍के‍ऄनुुार‍ूोंगे। 22.15 ुााजव जनक‍और‍ऄध-व ुााजव जनक‍-‍ुामाजजक‍ऄाुरं चना 22.15.1 स्ट्ाास्ट््य‍ुजु ाधाए ाँ क. ईपयजग‍पररुर‍एा‍ंपररभाीाए ाँ ताजलका‍22.54 ईपयजग‍पररुर‍एा‍ंपररभाीा - स्ट्ाास्ट््य‍ुजु ाधाए ं क्र.ु.ं ईपयजग‍पररुर पररभाीा 1. जबना‍ब,ड‍के‍स्ट्‍ाास्ट्‍्‍य‍ ऐुा‍पररुर‍जजुमें‍जचदकत्‍ुा‍ुलाू,‍दााइयों‍की‍व्‍यास्ट्थ‍ ा,‍और/ऄथाा‍‍दकुी‍जबमारी‍ ुुजाधाएं‍ के‍लक्षणों‍की‍पुजष्ट‍ूते ‍ु जाजभन्‍न‍ट,स्ट्‍ट‍दकए‍जा‍ुके।‍ऐुी‍ुुजाधाओं‍के‍जलए‍जनरीक्षण‍ब,ड प्रदान‍दकए‍जा‍ुकत‍े ू।ैं ‍(ज,ु‍ेऔीधालय/क्ल‍ ीजनक/क्ल‍ ीजनकल‍ल,बजरे‍री‍अदद)‍ 2. जबना‍ब,ड‍के‍स्ट्‍ाास्ट्‍्‍य‍ ऐुा‍पररुर‍जजुमें‍जचजक्त्ुा‍ुलाू‍ूते ‍ु ुुजाधाएं‍ूों‍और‍दााआयों‍की‍व्‍यास्ट्थ‍ ा‍ूज‍ ुुजाधाएं‍(पिु‍ (ज,ुे‍पिओंु ‍और‍पजक्षयों‍के‍जलए‍औीधालय,‍पालत‍ु पिओंु ‍के‍जलए‍क्ल‍ ीजनक‍अदद)‍ जचदकत्‍ुालय‍)‍ 3. ब,ड‍ुजूत‍स्ट्‍ाास्ट्‍्‍य‍ ऐुा‍ पररुर‍ जजुमें‍ 50‍ जबस्ट्तरों‍ तक‍ आन्‍डजर‍ और‍ अईटडजर‍ रजजगयों‍ के‍ जलए‍ ुुजाधाएं‍(लघ)ु ईपचार/देखभाल‍ूते ु‍जचदकत्‍ुा‍ुुजाधाएं‍ूों।‍ऐुे‍पररुर‍में‍जािेी‍जरूरतज‍ााल‍े व्‍यजि यों,‍बुजगो‍अदद‍के‍जलए‍स्ट्‍ाास्ट्‍्‍य‍देखभाल‍ुुजाधाएं‍ूों‍और‍दकुी‍रजग/बीमारी‍ की‍पुजष्ट‍के‍जलए‍दकुी‍व्‍यजि ‍के‍स्ट्‍ाास्ट्‍्‍य‍की‍जस्ट्थजत‍के‍प,थालॉजजकल/रेजडयजलॉजजकल‍ मूल्‍याकंन‍ूते ‍ु ुुजाधाएं‍ूों।‍‍ (ज,ुे‍ नर्मुग‍ ूजम/प्रुुजत‍ गूृ /पॉजलक्ल‍ ीजनक/पीएचुी/परराार‍ कल्‍याण‍ केंद्र/बाल‍ जचदकत्‍ुा‍ केंद्र/गीरेरीक‍ केंद्र/रांजजुन-ूॉम/ररुपाआट‍ केयर‍ ुेंट,‍ स्ट्‍ाज, च्छक‍ स्ट्‍ाास्ट्‍्‍य‍ ुेााएं,‍न,दाजनक‍केंद्र,‍निा‍मुजि /पनु वााु‍ुुजाधाएं‍अदद)‍‍ 4. ऄस्ट्पताल ऐुा‍ पररुर‍ जजुमें‍ अंतररक‍ एा‍ं बाह‍य‍ रजजगयों‍ के‍ ईपचार‍ ूते ‍ु ुामान्य‍ ऄथाा‍ जािेी/ईन्‍नत‍प्रकृजत‍की‍जचदकत्ुा‍ुुजाधाएं‍प्रदान‍की‍जाएगी।‍ऐुे‍पररुरों‍म‍ें स्ट्‍ाास्ट्‍्‍य‍ देखभाल‍ु‍े ुंबंजधत‍अर‍एण्‍ड‍डी‍ुुजाधाएं‍भी‍िाजमल‍ूोंगी।‍(ज,ुे-‍ऄस्ट्‍पताल‍ततृ ीयक‍ स्ट्‍ाास्ट्‍्‍य‍रक्षा‍केंद्र)‍‍ 5. निामुजि /पनु वााु‍केंद्र‍ ऐुा‍पररुर‍जजुमें‍दकुी‍पदाथव‍(ज,ुे‍ड्रग,‍एल्‍कजूल‍आत्‍यादद)‍का‍ईपयजग‍करन‍े के‍ कारण‍ ईत्‍पन्न‍ ‍ जाकार‍ का‍ ईपचार‍ प्रदान‍ करने‍ की‍ ुुजाधा‍ ूज‍ तथा‍ एक्‍यूट‍ डीटजजक्ुदफकेिन‍ुेंटर‍ुे‍दीघकव ाजलक‍ईपचार‍केंद्रों‍की‍श्रृंखला‍तक‍रीूज, बलेिन‍ुुजाधा‍ ूज।‍(ज,ुे‍स्ट्‍ट,डऄलजन‍डी-एजडक्ि‍ न‍ुेंटर/रीूज, बलेिन‍ुेंटर) 6. पिु‍जचदकत्ुा‍ पिुओं‍और‍पजक्षयों‍के‍अंतररक‍और‍बाह‍य‍ईपचार‍के‍जलए‍जचदकत्ुा‍ुुजाधाओं‍ााला‍ ऄस्ट्पताल कजइ‍पररुर। (ज,ुे-‍पिु‍जचदकत्ुा‍ऄस्ट्पताल) 7. पिु‍जचदकत्ुा‍ुंस्ट्थान पिु‍जचदकत्ुा‍जाज्ञान‍और‍पिुपालन‍म ें जडग्री, जडप्लजमा, लाआुेंु‍प्रदान‍करन‍े ूते ‍ु जचदकत्ुा‍जिक्षा‍और‍प्रजिक्षण‍प्रदान‍करने‍ााला‍कजइ‍पररुर। 8. जचदकत्ुा‍ ुुजाधाओं‍ााला‍कजइ‍पररुर, जजुमें‍कजइ‍्जि ‍ऄ्ययन‍ऄथाा‍प्रजिक्षण‍के‍द्वारा‍ऐुे‍ मूाजाद्यालय दकुी‍भी‍स्नातकजिर‍पाठक्रम‍ुजूत‍ऄ्ययन‍ऄथाा‍प्रजिक्षण‍के‍पाठक्रम‍कज‍पूरा‍कर‍ ुकता‍ू,, जज‍ईुे‍दकुी‍मान्यता‍प्राप्त‍जचदकत्ुा‍यजग्यता‍प्राप्त‍करन‍े के‍जलए‍ऄूतव ा‍ प्रदान‍करेगा।240 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] नजट:‍स्ट्‍ाास्ट्‍्‍य‍ुुजाधाओं‍कज‍ुाावजजनक/जनजी/स्ट्‍ा,जच्छक‍ुंगठनों‍द्वारा‍व्‍याजस्ट्थत‍दकया‍जा‍ुकता‍ू।, ‍ ख. ऄनमु ये ‍गजतजाजधया ं ताजलका 22.55 ईपयजग‍पररुर‍एा‍ंऄनमु ये ‍गजतजाजधया‍ाँ–‍स्ट्ाास्ट््य‍ुजु ाधाए ाँ ईपयजग‍जजन‍ अर‍डी‍ पी‍एु‍1 क्रम‍ु.ं ईपयजग‍पररुर‍ ा ा ‍ स्ट् ‍ के ा न‍य ड‍ ब्‍ ,बस्ट् ‍‍ ‍ एं ा ध ा ज ुु ा ा ‍ स्ट् ‍ के ा न‍य ड‍ ब्‍ ,बस्ट् ‍‍ ‍ुि प ( ‍ ‍ एं ा ध ा ज ुु ा ु ‍ त् क द च‍ ) ज ा ा ‍ स्ट् ‍त ू ज ु ‍य ड‍ ्‍ स्ट्‍ ) ुघ ल ( ‍ एं ा ध ा ज पल ‍ स्ट्ा ऄत ‍ ि ‍ ु जा ुमा ावन िुप न/ द्र कें ा ु ‍ त् क द च ज ‍य ुिल ‍ ा ु त् क द च ज य ल ा द्य ा ज ा ू म ा थ ‍ स्ट् ंु ‍ ा ु ि ज च ज ‍ुि‍ न ज ज ,ब ुु प प ऄनमु त‍गजतजाजधया‍ं 1 2 3 4 5 6 7 8 1 प्रिाुजनक‍कायावलय‍ रजजगयों‍के‍अन्‍तररक‍ 2 ईपचार‍के‍जलए‍ुुजाधाएं‍‍ रजजगयों‍के‍ााह्य‍ईपचार‍ 3 के‍जलए‍ुुजाधाए ं पिुओं‍और‍पजक्षयों‍के‍ 4 अन्‍तररक‍ईपचार‍के‍जलए‍ ुुजाधाएं पिुओं‍और‍पजक्षयों‍के‍ 5 ााह्य‍ईपचार‍के‍जलए‍ ुुजाधाएं निामुजि /पनु वााु/‍ 6 परामिव‍केंद्र‍ 7 अर‍एां‍डी‍ुुजाधाएं 8 ल,बजरेरररक‍ 9 न,दाजनक‍ुुजाधाएं‍ * 10 कॉलेज / ुंस्ट्‍थान‍ 11 पुस्ट्‍ताकल/ााचनालय ाॉच‍एंड‍ााड‍वरेजजडेंु‍ 12 (20‍ाग‍वमी.‍तक) खुदरा‍दकु ान‍ (क,जमस्ट्ट‍‍ 13 िॉप‍केाल‍ 20 ागव‍मी.‍ तक) खुदरा‍दकु ान‍ (क,जमस्ट्ट‍‍के‍ 14 ऄलााा) 15 कैंटीन/ क,फेरटररयां 16 एटीएम 17 ाेलडग‍बथू /क्य‍ जस्ट्‍क[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 241 ईपयजग‍जजन‍ अर‍डी‍ पी‍एु‍1 क्रम‍ु.ं ईपयजग‍पररुर‍ ा ा ‍ स्ट् ‍ के ा न‍य ड‍ ब्‍ ,बस्ट् ‍‍ ‍ एं ा ध ा ज ुु ा ा ‍ स्ट् ‍ के ा न‍य ड‍ ब्‍ ,बस्ट् ‍‍ ‍ुि प ( ‍ ‍ एं ा ध ा ज ुु ा ु ‍ त् क द च‍ ) ज ा ा ‍ स्ट् ‍त ू ज ु ‍य ड‍ ्‍ स्ट्‍ ) ुघ ल ( ‍ एं ा ध ा ज पल ‍ स्ट्ा ऄत ‍ ि ‍ ु जा ुमा ावन िुप न/ द्र कें ा ु ‍ त् क द च ज ‍य ुिल ‍ ा ु त् क द च ज य ल ा द्य ा ज ा ू म ा थ ‍ स्ट् ंु ‍ ा ु ि ज च ज ‍ुि‍ न ज ज ,ब ुु प प ऄनमु त‍गजतजाजधया‍ं 1 2 3 4 5 6 7 8 18 स्ट्‍टाफ‍के‍जलए‍अााु रजजगयज‍की‍देखभाल‍ 19 करने‍के‍जलए‍अााु‍ 20 ूॉस्ट्‍टल‍ 21 आन्‍डजर ‍गेम‍ूॉल 22 बैंक‍एक्‍ुटेंिन‍काईंटर 23 ईपाुना‍कक्ष‍ 24 क्र,च/ड-े केयर‍ुुजाधाएं यातायात‍पुजलु‍जनयंत्रण‍ 25 कक्ष / पुजलु‍चौकी 26 ऄजग्नश्‍मन‍चौकी 27 पजस्ट्‍ट‍अदफु‍काईंटर‍ 28 ऑडीटजररयम‍ ग.‍जाकाु‍जनयत्रं ण‍मानदडं ताजलका 22.56 स्ट्ाास्ट््य‍ुजु ाधाए ाँ न्यनू तम‍ ऄजधकतम‍ न्यनू तम‍ क्र.ुं प्लॉट‍क्षत्रे ‍ उाँचाइ ईपयजग‍पररुर‍ ुख्ं या ग्राईंड‍कारेज एफएअर मागाजव धका . (ाग‍वमी.)/‍ (मी.) (%) र‍(मी.) यजू नट स्ट्थानीय‍स्ट्तर जनुंख्या‍10000‍तक जबना‍ब,ड‍के‍स्ट्‍ाास्ट्‍्‍य‍ 1 ुुजाधाएं‍ 1 800 30% 150 12 ुामदु ाजयक‍स्ट्तर जनुंख्या‍100000‍तक 1 जबना‍ब,ड‍के‍स्ट्‍ाास्ट्‍्‍य‍ 1 300 35% 100 18242 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] न्यनू तम‍ ऄजधकतम‍ न्यनू तम‍ क्र.ुं प्लॉट‍क्षत्रे ‍ उाँचाइ ईपयजग‍पररुर‍ ुख्ं या ग्राईंड‍कारेज एफएअर मागाजव धका . (ाग‍वमी.)/‍ (मी.) (%) र‍(मी.) यजू नट ुुजाधाएं‍(पिु‍ जचदकत्‍ुालय) 2 स्ट्‍ाास्ट्‍्‍य‍ुुजाधाएं‍(लघु)‍‍ 6 1000* 30% 150 18 24‍मीटर‍ुे‍‍ कम‍ मागावजधकार‍के‍ जलए‍250 40%‍और‍ 24‍मीटर‍ुे‍ 5%‍ 2000- ऄजधक‍‍ 3 ऄस्ट्पताल 3 15000 (एमएलुी‍ मागावजधकार‍के‍ पी)‍बी‍अर‍ जलए‍300, टी 30‍मीटर‍ुे‍ ऄजधक‍ मागावजधकार‍के‍ जलए‍375‍ ईप-िूरी‍स्ट्तर जनुंख्या‍500000‍तक 18‍मीटर‍ुे‍24‍ मीटर‍ मागावजधकार‍के‍ 40%‍एां‍‍ जलए‍250, 1.5‍ूक्े ट‍.‍‍ 5%‍ 24‍मीटर‍ुे‍ ुे‍ऄजधक‍ उपर‍ 1 ऄस्ट्पताल* 3 (एमएलुीपी मागावजधकार‍के‍ ) 18 जलए‍300‍मीटर 30‍मीटर‍ुे‍ उपर‍ मागावजधकार‍के‍ जलए‍375‍मीटर निा‍मजु ि ‍केंद्र/पनु ाव ाु‍ 2 1 2000 35% 150 18 केंद्र‍ 3 पि‍ुजचदकत्ु‍ ा‍ऄस्ट्प‍ताल 1 2000 30% 150 18 िूरी‍स्ट्तर जनुंख्या‍20,00,000‍तक[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 243 न्यनू तम‍ ऄजधकतम‍ न्यनू तम‍ क्र.ुं प्लॉट‍क्षत्रे ‍ उाँचाइ ईपयजग‍पररुर‍ ुख्ं या ग्राईंड‍कारेज एफएअर मागाजव धका . (ाग‍वमी.)/‍ (मी.) (%) र‍(मी.) यजू नट एमुीअइ‍ ुकल‍ 1 मजे डकल‍कॉलजे मानदंडों‍के‍ एफएअरः‍160 ऄनुुार कॉलेज‍और‍ अाश्य ऄस्ट्पताल‍=‍ कता‍ 35% न्यूनतम‍75% 24 ऄनुुार भारतीय‍पि‍ु अााु‍=‍ जचदकत्ुा‍ न्यूनतम‍20% पररीद‍/‍ मंत्रालय‍के‍ ऄन्य‍=‍5% तक 2 पि‍ुजचदकत्ुा‍ुस्ट्ं थान मानदंड नजटः *‍जाकजुत‍क्षेत्रों‍में‍प्ल‍ ॉट‍का‍अकार‍भूजम‍की‍ईपलब्ध‍ ता‍के‍अधार‍पर‍जभन्‍न‍ूज‍ुकता‍ू।, **अााुीय‍क्षेत्र‍में‍ऄस्ट्पताल‍के‍प्‍लॉट‍का‍अकार‍1.5‍ूक्े टेयर‍तक‍ुीजमत‍ूजगा, जजुम‍ें प्‍लॉट‍के‍तीन‍तरफ‍ुे‍खुले‍ूजन‍े और‍एक‍तरफ‍कम‍ुे‍कम‍18‍मीटर‍का‍मागावजधकार‍ूजने‍कज‍प्राथजमकता‍दी‍जाएगी।‍ऄस्ट्पताल‍का‍कुल‍फ्लजर‍एररया‍ आुमें‍स्ट्ाीकृत‍जबस्ट्तर‍की‍कुल‍ुंख्या‍के‍ऄनुुार‍जनधावररत‍दकया‍जाएगा। ईपरजि ‍ईपयजग‍पररुर‍के‍जलए‍ऄन्य‍जनयत्रं ण: i. एएअइ,‍डीएफएु,‍डीएमए,‍एनएमए‍और‍ऄन्य‍ा,धाजनक‍जनकायों‍ुे‍मंजूरी‍के‍ऄ्‍यधीन‍उाँचाइ‍पर‍कजइ‍ प्रजतबंध‍नूीं‍ूजगा। ii. प्रुूजत‍ गृू, नर्मुग‍ ूजम/पॉलीजक्लजनक, प्राथजमक‍ स्ट्ाास्ट््य‍ केंद्र, परराार‍ कल्याण‍ केंद्र, बाल‍ जचदकत्ुा‍ केंद्र/जराजचदकत्ुा‍केंद्र, डायग्नजजस्ट्टक‍ुेंटर‍के‍जलए न्यूनतम‍ुकल‍क्षेत्र‍प्रजत‍जबस्ट्तर‍60‍ाग‍व मीटर‍ूजना‍चाजूए‍ तथा‍ऄस्ट्पतालों, ऄत्याधुजनक‍स्ट्ाास्ट््य‍देखभाल‍केंद्र,‍निामुजि /पनु ाावु‍केंद्र, ऄनुुंधान‍और‍जाकाु‍ुुजाधाओं, पालत‍ू पिओंु ‍और‍ऄन्य‍पिुओं‍के‍जलए‍पि‍ु जचदकत्ुा‍ऄस्ट्पताल, मेजडकल‍कॉलेज, पिु‍जचदकत्ुा‍ुंस्ट्थान‍ज,ु‍े ईपयजग‍पररुरों‍के‍जलए न्यूनतम‍ुकल‍फ्लजर‍एररया‍80‍ाग‍वमीटर‍प्रजत‍जबस्ट्तर‍ूजगा। iii. ऄस्ट्पतालों,‍ततृ ीयक‍स्ट्ाास्ट््य‍दखे भाल‍केंद्र, पिु‍जचदकत्ुा‍ऄस्ट्पतालों, निामुजि /पनु ाावु‍केंद्रों‍तथा‍ऄनुुंधान‍और‍ जाकाु‍(अरएंडडी)‍ुुजाधाओं‍के‍जलए, एररयम‍प्रदान‍करन‍े ूते ु ‍ऄजधकतम‍10%‍ग्राईंड‍कारेज‍की‍ऄनुमजत‍ ूजगी।‍यदद‍एररयम‍के‍ऄनुमेय‍के‍ऄजतररि ‍तल‍कारेज‍ईपयजग‍दकया‍जाता‍ू‍, तज‍ईपयजग‍दकए‍गए‍25%‍ग्राईंड‍ कारेज‍कज‍एफएअर‍के‍जलए‍जगना‍जाएगा। iv. ऄस्ट्पतालों, तृतीयक‍स्ट्ाास्ट््य‍दखे भाल‍केंद्र, पिु‍जचदकत्ुा‍ऄस्ट्पतालों, निामुजि /पनु ाावु‍केंद्रों‍तथा‍ऄनुुंधान‍और‍ जाकाु‍(अरएडं डी)‍ुुजाधाओं‍के‍जलए‍मल्टीलेाल‍पजजडयम‍पार्ककग‍की‍ुुजाधा‍ुंरचनागत‍ुुरक्षा‍के‍ऄ्यधीन,‍ भान‍की‍जनमावण-पररजध‍तक‍ऄनुमत‍ूजगी,‍एफएअर‍और‍ग्राईंड‍कारेज‍ुे‍मि ु ‍ूजगी‍तादक‍खुले‍स्ट्थान‍में‍पयावप्त‍ पार्ककग‍की‍ुुजाधा‍ईपलब्ध‍ूज‍ुके। v. ऄस्ट्पतालों, तृतीयक‍स्ट्ाास्ट््य‍दखे भाल‍केंद्र, पिु‍जचदकत्ुा‍ऄस्ट्पतालों, निामुजि /पनु ाावु‍केंद्रों‍तथा‍ऄनुुंधान‍और‍ जाकाु‍(अरएडं डी)‍ुुजाधाओं‍के‍जलए, ईपलब्ध‍एफएअर‍का‍ऄजधकतम‍10%‍मफ्ु त‍ूजगा,‍यदद‍आुका‍ईपयजग‍244 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] प्रतीक्षा‍और‍स्ट्ाागत‍कक्ष‍के‍जलए‍दकया‍जाए।‍तथाजप, ऄस्ट्पताल‍की‍पार्ककग‍के‍प्रााधान‍के‍जलए‍मानदंडों‍के‍ ऄनुुार‍आु‍क्षेत्र‍कज‍जूुाब‍में‍जलया‍जाएगा। vi. ऄस्ट्पतालों, तृतीयक‍स्ट्ाास्ट््य‍दखे भाल‍केंद्र, पिु‍जचदकत्ुा‍ऄस्ट्पतालों, निामुजि /पनु ाावु‍केंद्रों‍तथा‍ऄनुुंधान‍और‍ जाकाु‍(अरएडं डी)‍ुुजाधाओं‍के‍जलए, 1.8‍मीटर‍की‍उाँचाइ‍ााली‍ुर्नाु‍फ्लजर‍कज‍एफएअर‍में‍नूीं‍जगना‍ जाएगा। vii. पयावारण, ान‍और‍जलाायु‍पररातवन‍मंत्रालय‍के‍प्रचजलत‍जाजनयमों‍के‍ऄनुुार‍पयावारणीय‍ऄनापजि‍ऄजनााय‍व ू।, viii. ुीारेज‍के‍जलए‍िून्य‍जडस्ट्चाज‍व की‍ितव‍प्रमजटरों‍पर‍लागू‍की‍जाएगी‍तथा‍आुका‍खचव‍ाे‍ूी‍ईठाएंगे‍और‍िजधन‍ के‍बाद‍पानी‍का‍आस्ट्तेमाल‍पररुर‍में‍बागाानी, फ्ललिग, कूलटें ‍टॉार, धुलाइ‍या‍ऄन्य‍जनमाणव ‍स्ट्थलों‍की‍जरूरतों‍ के‍जलए‍दकया‍जा‍ुकता‍ू।, ‍ये‍मुद्दे‍स्ट्थानीय‍जनकायों‍ुे‍ुंबंजधत‍ू‍ैं और‍यजजना‍कज‍मंजरू ी‍देते‍ुमय‍मौजूदा‍ जाजनयमों‍के‍ऄनुुार‍आन‍पर‍कारवााइ‍की‍जा‍ुकती‍ू।, ix. एररयम‍के‍जलए‍छत‍के‍रजिनदान‍की‍ित‍व में‍छूट‍दी‍गइ‍ू‍,और‍एररयम‍पर‍जनमावण‍की‍ऄनुमजत‍दी‍जा‍ुकती‍ू।, x. मौजूदा‍पररुरों‍/‍स्ट्थलों‍के‍मामले‍म,ें ार्नधत‍एफएअर‍की‍ऄनुमजत‍दी‍जाएगी‍जज‍प्राजधकरण‍/‍भूजम‍स्ट्ााजमत्ा‍ एजेंुी‍द्वारा‍जनधावररत‍िल्ु क‍के‍भुगतान‍और‍ऄन्य‍स्ट्ाीकृजतयों‍के‍ऄ्यधीन‍ूजगा। xi. पार्ककग‍के‍जलए‍ईपयजग‍के‍बाद‍बेुमेंट; ुेाा‍अाश्यकताएाँ‍ज,ुे‍दक‍एयरकंडीिलनग‍प्लांट‍और‍ईपकरण, पानी‍ का‍भंडारण, बॉयलर, आलेजक्रक‍ुबस्ट्टेिन, एचटी‍एंड‍एलटी‍प,नल‍रूम, रांुफामवर‍कम्पाटवमेंट, कंरजल‍रूम, पंप‍ ूाईु, जनरेटर‍रूम; स्ट्टाफ‍लॉकर‍रूम, स्ट्टाफ‍चेंलजग‍रूम, दकचन‍की‍ुुजाधा‍के‍जबना‍स्ट्टाफ‍डाआलनग‍ुुजाधाएं, ुेंरल‍स्ट्टेराआल‍ुप्लाइ‍जाभाग, ब,क‍एंड‍ऑदफु; ऄन्य‍यांजत्रक‍ुेााएाँ; जाद्युत‍और‍ऄजग्निमन‍ईपकरणों‍की‍ ुंस्ट्थापना; और‍ऄन्य‍ुेााएं‍जु, े‍दक‍रुजइ, लांड्री‍और‍रेजडयजलॉजी‍ल,ब‍तथा‍भान‍के‍रखरखाा/कायवप्रणाली‍के‍ जलए‍अाश्यक‍ऄन्य‍अाश्यक‍ुेााएं, ुंबंजधत‍एजेंजुयों‍की‍पूाव‍स्ट्ाीकृजत‍के‍ुाथ‍स्ट्ाास्ट््य‍ुुजाधाओं‍के‍जलए‍ ईपयजग‍म‍ेंलाइ‍जा‍ुकती‍ू।ैं xii. ऄनीु गं ी‍ईपयजग‍ूते ‍ुित:े‍ क.‍ऄस्ट्‍पताल‍(1.5‍ूक्े ट‍ेयर‍के‍मामले‍में)‍ i. अााुीय‍घटक/ईपयजग‍ज,ुे‍दक‍जरूरी‍स्ट्‍टाफ‍और‍रजजगयज‍के‍पररचारकों‍के‍‍‍अााु‍के‍जलए‍ऄजधकतम‍25‍ %‍एफ‍ए‍अर‍की‍ऄनुमजत‍ूजगी। ii. अााुीय‍घटक‍ुे‍ऄलग‍ुूायक‍ुुजाधाओं‍के‍जलए‍300‍ाग‍वमीटर‍तक‍की‍‍‍ऄनुमजत‍ूजगी।‍ ख. ऄस्ट्‍पताल‍(1.5‍ूक्े ट‍ेयर‍ुे‍उपर)‍और‍पनु वााु‍ुुजाधा‍के‍मामले‍म:ें‍ i.‍अााुीय‍घटक/ईपयजग‍जेु‍े दक‍जरूरी‍स्ट्‍टाफ‍और‍रजजगयों‍के‍पररचारकों‍के‍अााु‍के‍जलए‍ऄजधकतम‍ 25%‍एफएअर ii.‍अााुीय‍घटक‍ुे‍ऄलग‍ुूायक‍ुुजाधाओं‍के‍जलए‍500‍ागव‍मीटर‍तक‍के‍जनर्नमत‍क्षेत्र‍के‍11%‍एफएअर‍ की‍ऄनुमजत‍ूजगी।‍ ग. पिु‍ऄस्ट्‍पताल‍के‍मामल‍े में:‍ i.‍अााुीय‍घटक/ईपयजग‍ज,ुे‍दक‍जरूरी‍स्ट्‍टाफ‍और‍पररचारकों‍के‍अााु‍ूते ु‍‍ऄजधकतम‍10%‍एफ‍ए‍अर‍ की‍ऄनमुजत‍ूजगी। ii.‍अााुीय‍घटक‍ुे‍ऄलग‍ुूायक‍ुुजाधाओं‍के‍जलए‍300‍ागव‍मीटर‍तक‍जनर्नमत‍क्षेत्र‍‍के‍ऄजधकतम‍1%‍ एफएअर‍की‍ऄनमुजत‍ूजगी।‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 245 घ. ‍मेजडकल‍कॉलेज‍और‍पिु‍जचदकत्‍ुा‍ुंस्ट्‍थान‍के‍मामले‍म:ें‍‍ऄनुमत‍ुूायक‍गजतजाजधयों‍के‍जलए‍‍ऄजधकतम‍ 30%‍एफएअर‍‍की‍ऄनुमजत‍ूजगी। i.‍अााुीय‍घटक/ईपयजग‍ज,ु‍े दक‍जरूरी‍स्ट्‍टाफ‍और‍रजजगयों‍के‍पररचारकों‍के‍अााु,‍जाद्यार्नथयों‍के‍ छात्राााु‍के‍जलए‍ऄजधकतम‍20%‍एफएअर‍की‍ऄनुमजत‍ूजगी।‍ ii.‍अााुीय‍ुे‍ऄलगक‍ऄन्‍य‍ुूायक/ऄनुीगं ी‍ुुजाधाओं‍के‍जलए‍ऄजधकतम‍5%‍एफएअर‍की‍ऄनुमजत‍ूजगी।‍ 22.15.2 जिक्षण‍ुजु ाधाए ं क. ईपयजग‍पररुर‍एा‍ंपररभाीाए ाँ ताजलका 22.57 जिक्षण‍ुजु ाधाओं‍के‍जलए‍ईपयजग‍पररुर‍और‍पररभाीा क्र.ु.ं ईपयजग‍पररुर पररभाीा 1 जिक्षण‍केंद्र/क्रेच‍ ुूायक/ुमांतर‍जिक्षा‍ुुजाधाओं‍कज‍प्रदान‍करने‍के‍जलए‍ईपयजग‍ दकया‍गया‍पररुर‍ 2 स्ट्‍कूल‍(टाआप-I)‍‍ ऐुा‍पररुर‍जूां‍कक्षा‍पााँच‍तक‍के‍छात्रों‍के‍जलए‍ि,जक्षक‍और‍ खेल‍ुुजाधाएं‍ूों।‍V/VIII‍(ज,ुे-‍प्राआमरी‍स्ट्‍कूल,‍जमजडल‍ुकूल)‍ 3 स्ट्‍कूल‍(टाआप-II)‍‍ ऐुा‍पररुर‍जूां‍कक्षा‍बारू‍तक‍के‍छात्रों‍के‍जलए‍ि,जक्षक‍और‍ खेल‍ुुजाधाएं‍ूों।‍(ज,ुे‍ुीजनयर‍ुेंकेण्ड‍ री‍स्ट्‍कूल,‍ुेंकेण्ड‍ री‍स्ट्क‍ूल,‍ आंटीग्रेरटड‍स्ट्‍कूल)‍ 4 स्ट्‍पिे ल‍स्ट्‍कूल‍ ऐुा‍ पररुर‍ जूां‍ मानजुक‍ रूप‍ ुे‍ जाकलांग‍ और‍ दद्ांग‍ ्जि यों‍ के‍ जलए‍ ि,जक्षक‍ (औपचाररक‍ और‍ ्ााुाजयक)‍ और‍ खेलने‍की‍ुुजाधाएं‍ूों।‍(ज,ु-े ‍मानजुक‍रूप‍ुे‍जाजक्षप्‍त‍बच्‍चों‍के‍ ज ‍लए‍स्ट्‍कूल,‍ददव्‍यांगजनों‍के‍जलए‍स्ट्‍कूल)‍ 5 ऄनुुंधान‍और‍जाकाु‍केंद्र‍ दकुी‍जािेी‍क्षे9‍के‍जलए‍ऄनुु ंधान‍और‍जाकाु‍ूते ु‍जुुजाधाए‍ं प्रदान‍करने‍ााला‍एक‍पररुर‍ (ज,ुे-‍ऄनुुंधान‍और‍जाकाु‍केंद्र)‍‍ 6 ुंस्ट्‍थान‍ व्‍यााुाजयक‍ प्रजिक्षण‍ और‍ जिक्षा‍ (रजजगार‍ के‍ जलए‍ तकनीकी/व्‍याुाजयक/प्रबंधन/प्रारंजभक)‍ (ज,ुे-‍ व्‍यााुाजयक‍ प्रजिक्षण‍ ुंस्ट्‍थान/अइटीअइ/पॉजलटेदक्नक/व्‍यााुाजयक/प्रजिक्षण‍ ुंस्ट्‍थान/प्रबंधन‍ ुंस्ट्‍थान/जिक्षक‍ प्रजिक्षण‍ ुंस्ट्थ‍ ान,‍ ााजणजज्यक/ुजचाीय‍ प्रजिक्षण‍ केंद्र,‍ ूजटल‍ प्रबंधन,‍ नर्मुग‍और‍ प,राम,जडक‍ुंस्ट्थ‍ ान‍अदद)‍ 7 कॉलेज ऐुा‍पररुर‍जूां‍जाश्‍ाजाद्यालय‍के‍ऄदं र‍ऄडं रग्रेज्युएट‍और‍पजस्ट्‍ट‍246 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] क्र.ु.ं ईपयजग‍पररुर पररभाीा ग्रेज‍य्‍ ुएट‍ कजुव‍ के‍ जाद्यार्नथयों‍ के‍ जलए‍ ि,जक्षक‍ और‍ खले न‍े की‍ ुुजाधाएं‍ू।ैं ‍(ज,ुे-‍जनरल‍कॉलेज‍प्रजफेिनल‍कॉलेज)‍‍‍ 8 जािजाद्यालय ऐुा‍पररुर‍जूां‍जस्ट्थत‍जिक्षण‍ुंस्ट्थान‍‍ईन्नत‍जिक्षण‍की‍कइ‍ िाखाओं‍में‍छात्रों‍के‍जिक्षण, परीक्षा, या‍दजनों‍के‍जलए‍जडज़ाआन‍ दकया‍गया‍ूज, जाजभन्न‍ुंकायों‍म‍ें जडग्री‍प्रदान‍करता‍ू,, और‍ ऄक्ुर‍कॉलेजों‍और‍ुमान‍ुंस्ट्थानों‍का‍मूत‍वरूप‍ूजता‍ू।,[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 247 ख. ऄनमु ये ‍गजतजाजधया ं ताजलका 22.58 ईपयजग‍पररुर‍एा‍ंऄनमु त‍गजतजाजधया ं- जिक्षण‍ुजु ाधाए ं ईपयजग‍जजन‍ अर‍डी‍ पी‍एु‍1 ‍ ‍ ‍ ‍ ‍ ‍ ऄनमु त‍ईपयजग‍ ‍ ण क्ष ि ज च क्रे / द्र कें ‍ ‍ ‍ ‍ ‍ कू‍ ‍ल‍ स्ट्‍ प आ ा ट- I ‍ ‍ ‍ ‍ ‍ कू‍ ‍ल‍ स्ट्‍ प आ ाI ट- I कू‍ स्ट् ‍ ल ेप‍ ‍िल स्ट् ‍ंा ए ‍ न ा ध ंु ुन ऄ कें ‍ ु ा क ा ज ा थ ‍ स्ट् ंुन ज ेल ॉ क य ल ा ाद्य ‍ श् ाा जज ऄनमु त‍गजतजाजधया ं 1 2 3 4 5 6 7 8 1 क्रेच‍एां‍डे-केयर‍ुेंटर‍‍ 2 नुवरी‍स्ट्‍कूल‍ 3 दकयजस्ट्‍क 4 कैंटीन/क,फी‍टीररयां 5 20‍ागव‍मीटर‍तक‍ देखभाल‍और‍जनगरानी‍ अााु 6 20‍ागव‍मी.‍तक‍खुदरा‍ दकु ाने 7 बैंकएक्‍ुटेंिन‍काईंटर‍ 8 एटीएम‍ 9 ऑडीटजररयम 10 आंडजर‍गेम्‍ु‍ूॉल‍ 11 स्ट्‍ाीलमग‍पलू ‍ 12 पजस्ट्‍ट‍अदफु‍काईंटर‍ ुुजाधा‍ 13 छात्राााु‍ुुजाधा‍ 14 जरूरी‍स्ट्‍टाफ‍और‍छात्रों‍ का‍अााु‍ईपयजग‍ 15 पुनाावु‍केंद्र‍ 16 ाकविॉप‍ 17 कॉलेज‍ 18 खेल‍का‍म,दान‍ 19 पुस्ट्‍तकालय‍248 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ग. जाकाु‍जनयत्रं ण‍मानदडं ताजलका‍22.59 : जिक्षा‍ुजु ाधाए ं क्र.ु.ं ईपयजग‍पररुर‍ ुं न्यनू तम‍ ऄजधकतम‍ एफए न्यनू तम‍ उंचाइ ख्या प्लॉट‍ ग्राईंड‍ अर मागाजव धकार‍ (मी.) क्षत्रे फल कारेज (मी.) (ाग‍वमी.) स्ट्थानीय‍स्ट्तर जनुंख्या‍10000‍तक 1 जिक्षण‍केंद्र/क्रेच 1 500 35% 120 12 2 स्ट्‍कूल‍(टाआप-I) 1 2000- 30% 120 18 18 4000 3 स्ट्‍कूल‍(टाआप-II)‍ 1 4000- 35% 150 18 18 8000 ऄन्य‍जनयत्रं ण: क. नए‍स्ट्कूलों‍के‍मामले‍म,ें अगंतकु ों‍की‍पार्ककग‍ूते ‍ु स्ट्थान‍देन‍े के‍जलए‍ुामन‍े की‍चारदीाारी‍(फ्रंट‍बाईंड्री‍ ाॉल)‍कज‍ुेटब,क‍क्षेत्र‍के‍ऄदं र‍6‍मी.‍पीछे‍करके‍जनर्नमत‍दकया‍जाएगा। ख. भूखंड‍के‍अकार‍म‍ें 10% तक‍के‍ऄतं र‍की‍ऄनुमजत‍ू।, ‍जािीे ‍क्षेत्र, जनयजमत‍कर‍दी‍गइ‍ऄनजधकृत‍ कॉलजजनयों, िूरी‍गांाों‍और‍पनु ाावु‍कालजजनयों‍पर‍जाभेदक‍मानदंड‍लाग‍ूूोंगे। ग. खेल‍का‍म,दान‍स्ट्थानीय‍स्ट्तर‍पर‍जाजभन्न‍क्षेत्रों‍म‍ेंपलू (ुमूूबद्ध)‍के‍अधार‍पर‍जाकजुत‍दकया‍जाएगा। नजटः‍अााुीय‍ईपयजग‍म‍ेंप्री-प्राआमरी‍स्ट्कूल‍/‍नुवरी‍स्ट्कूल‍/‍मोंटेुरी‍स्ट्कूल‍/‍क्रेच, प्ले‍स्ट्कूल‍ऄनुमेय‍ू ैं ईपयजग‍पररुर ुं न्यनू तम‍प्लॉट‍ ऄजधकतम‍ एफए न्यनू तम‍ उंचाइ ख्या क्षत्रे फल‍ ग्राईंड‍कारेज अर मागाजव धकार‍ (मी.) (ाग‍वमी.) (मी.) ईप-िूरी‍स्ट्तर जनुंख्या‍5,00,000‍तक 1 जािेी‍स्ट्‍कूल 4 2000 50% 120 18 18 2 ऄनुुंधान‍और‍जाकाु‍केंद्र 1 4000 35% 225 24 37 3 ुंस्ट्‍थान‍ 1 4000 35% 225 24 37 4 कॉलेज* 2 यूजीुी/एअ 35% 225 24 37 इुीटीइके‍‍ मानदंडों‍के‍ ऄनुुार ऄन्य‍जनयत्रं ण: क. प्लॉट‍के‍अकार‍म‍ें10%‍तक‍का‍ऄंतर‍ऄनुमेय‍ू।, ख. ‍स्ट्‍पेिल‍स्ट्‍कूल‍के‍मामले‍म,ें‍जरूरी‍स्ट्‍टाफ‍और‍छात्रों‍के‍रूने‍के‍अााु‍ईपयजग‍ूते ‍ु ऄजधकतम‍20%‍ ऄनुमेय‍एफएअर‍की‍ऄनुमजत‍ूजगी।‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 249 ईपयजग‍पररुर ुं न्यनू तम‍प्लॉट‍ ऄजधकतम‍ एफए न्यनू तम‍ उंचाइ ख्या क्षत्रे फल‍ ग्राईंड‍कारेज अर मागाजव धकार‍ (मी.) (ाग‍वमी.) (मी.) ईप-िूरी‍स्ट्तर जनुंख्या‍5,00,000‍तक ग. ‍ऄनुुंधान‍एां‍जाकाु‍केंद्रों,‍ुंस्ट्‍ ाज ानों‍और‍कॉलेजों‍के‍मामले‍में‍छात्रों‍और‍स्ट्‍टाफ‍के‍जलए‍छात्राााु‍ जनााु‍ूते ु‍ऄजधकतम‍30%‍ऄनुमेय‍एफएअर‍ईपयजग‍दकया‍जा‍ुकता‍ू।, ‍‍ घ. ओल्ड‍ ‍कॉलेज‍(4‍ूक्े ट‍ेयर‍क्षेत्रफल‍ुे‍उपर)‍के‍मामले‍में,‍प्‍लॉटों‍कज‍जनम्न‍ ानुुार‍जाभाजजत‍दकया‍ जाएगा:‍‍‍ क‍‍कॉलेज‍जबलल्डग‍क्षेत्र‍ 1.8‍ूक्े ट‍ेयर 45% ख‍खेल‍का‍म,दान‍ 1.8‍ूक्े ट‍ेयर 45% ग‍अााुीय‍ुजूत‍छात्राााु‍क्षेत्र‍ 0.4‍ूक्े ट‍ेयर 10% ऄकादजमक‍कॉलेज‍जबलल्डग‍और‍अााुीय‍के‍जलए‍जाकाु‍जनयंत्रण‍मानदंड‍ईु‍जाश्‍ाजाद्यालय‍के‍ुमान‍ ूी‍ूोंगे।‍ ईपयजग‍पररुर ुं न्यनू तम‍ ऄजधकतम‍ एफए न्यनू तम‍ उंचाइ ख्या प्लॉट‍ ग्राईंड‍ अर मागाजव धकार‍(मी.) (मी.) क्षत्रे फल‍ कारेज (ाग‍वमी.) िूरी‍स्ट्तर जनुंख्या‍20,00,000‍तक 1 ऄंतराष्ट्रव ीय‍ जिक्षा‍ केंद्र‍ (अइइुी) अा यूजीुी / श्यक ुजूत‍ जािजाद्यालय‍ पररुर‍ -‍ एअइुी ताओं‍ बड़े‍ पररुर‍ (10‍ ूक्े टेयर‍ और‍ टीइ के‍ 24 37 ईुुे‍उपर)‍कज‍जनम्नजलजखत‍चार‍ मानदंडों‍ ऄनु भागों‍में‍जाभाजजत‍दकया‍जाएगा: के‍ ुार ऄनुुार क) प्रिाुन‍ ुजूत‍ ऄकादजमक‍ 30% 225 37 (कुल‍भूजम‍क्षेत्र‍का‍45%) ख) अााुीय‍(कुल‍भूजम‍क्षेत्र‍का‍ 1. ुामूजूक‍अााु‍के‍जलए‍जाजनयम‍ लाग‍ूूोंगे। 25%) 2. भूजम‍कज‍अााुीय‍मानदंडों‍के‍ ऄनुुार‍जनधावररत‍ुुजाधाओं‍के‍जलए‍ अरजक्षत‍रखा‍जाएगा। ग) खेल‍ और‍ ुांस्ट्कृजतक‍ 10% 15 26 गजतजाजधयााँ‍(15%) घ) पाकव‍और‍लैंडस्ट्केप‍(15%) लाग‍ूनूीं250 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 22.15.3 डाक‍और‍दरू ुचं ार‍ुजु ाधाए ं क.‍ईपयजग‍पररुर‍एा‍ंपररभाीाए ाँ ताजलका 22.60 ईपयजग‍पररुर‍एा‍ंपररभाीा – डाक‍और‍दरू ुचं ार‍ुजु ाधाए ं क्र.ु.ं ईपयजग‍पररुर पररभाीा 1 पी‍एां‍टी‍ुुजाधा‍(टाआप-I) डाक,‍ कजररयर‍ ुेाा,‍ जडजजटल‍ ऄाुंरचना‍ और‍ दरू ‍ ुंचार‍ ुुजाधा‍ (ज,ुे-डाकघर‍ काईंटर,‍ कजररयर‍ ुेाा‍ कायावलय,‍ जडजजटल‍आंफ्रा‍ुुजाधा‍अदद)‍के‍जलए‍ुुजाधा/काईंटर‍ुजूत‍ पररुर‍ 2 पी‍एां‍टी‍ुुजाधा‍(टाआप-II) ऐुा‍पररुर‍जूां‍आुुे‍जुड़े‍कइ‍डाकघरों‍में/ुे‍‍डाक‍और‍ दरू ुंचार‍ुेाा‍के‍जलए‍अााजाूी‍की‍ुुजाधा‍ूज।‍ (ज,ुे-‍ प्रधान‍ डाक‍ घर,‍ मख्ु य‍ ‍ डाक‍ घर,‍ ईप-िूर‍ स्ट्‍तरीय‍ जडजजटल‍आंफ्रा‍ुुजाधा‍अदद)‍ 3 पी‍एां‍टी‍ुुजाधा‍(टाआप-III) ऐुा‍ पररुर‍ जूां‍ ुंबंजधत‍ मा्यम‍ ुे‍ ुमाचार‍ और‍ ऄन्य‍ कायवक्रमों‍की‍ररकॉर्मडग, प्रुारण‍और‍ुंचार,‍ु,टेलाआट‍और‍ दरू ुंचार‍प्रौद्यजजगकी‍का‍ऄनुु ंधान‍एां‍जाकाु‍मौुम‍और‍ पुाावनुमान‍ुंबंधी‍डाटा‍का‍ऄनुु ंधान‍एां‍जाकाु‍की‍ुुजाधाएं,‍ ूों।‍ 4 रांुजमिन‍टॉार‍और‍ाायरलेु‍ ऐुा‍पररुर‍जज‍ुंचार‍ईद्देश्यों‍के‍जलए‍टॉार‍की‍ुंस्ट्थापना‍के‍ स्ट्टेिन जलए‍आस्ट्तेमाल‍दकया‍जाए।‍ *‍पी‍एा‍ंटी‍ुुजाधा‍(टाआप-III)‍के‍भाग‍के‍रूप‍म‍ेंराुंजमिन‍ुाआट/ुेंटर‍पर‍जाचार‍दकया‍जाएगा।‍तथाजप,‍ऐुे‍ स्ट्‍थलों‍का‍जाकाु‍अाश्‍यकता‍के‍ऄनुुार‍ूजगा। ख.‍ऄनमु ये ‍गजतजाजधया ं ताजलका 22.61 ईपयजग‍पररुर‍एा‍ंऄनमु त‍गजतजाजधया ाँ- डाक‍और‍दरू ुचं ार‍ुजु ाधाए ं ईपयजग‍जजन‍ पी‍एु‍1 क्रम‍ु.ं ईपयजग‍पररुर‍ पी‍एां‍टी‍ुुजाधा‍‍‍‍‍‍‍‍‍‍(टाआप-II) पी‍एां‍टी‍ुुजाधा‍(टाआप-III) ऄममु त‍गजतजाजध‍ 1 2 1. खुदरा‍दकु ान‍ कैंटीन‍/क,फेटेररया/ ाेलडग 2. बूथ/दकयजु्‍‍क 3. ऑडीटजररयम 4. स्ट्‍टाफ‍के‍जलए‍जनााु/अााु देखभाल‍और‍जनगरानी‍अााु 5. (20‍ागव‍मी.‍तक)[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 251 ईपयजग‍जजन‍ पी‍एु‍1 क्रम‍ु.ं ईपयजग‍पररुर‍ पी‍एां‍टी‍ुुजाधा‍‍‍‍‍‍‍‍‍‍(टाआप-II) पी‍एां‍टी‍ुुजाधा‍(टाआप-III) ऄममु त‍गजतजाजध‍ 1 2 6. लाआब्रेरी/ररलडग‍रूम‍ दफटनेु‍ुेंटर‍(ग,र-व्‍यााुाजयक‍ 7. ईपयजग)‍ जाद्याथी/प्रजिक्षणार्नथयों‍के‍जलए‍ 8. ूॉस्ट्‍टल‍अााु‍ 9. प्रेु‍क्ल‍ ब‍ 10. डायलनग‍एररया मीजडया‍(लप्रट,‍टेलीजाजन‍और‍ 11. आंटरनेट)‍ूते ‍ु ुुजाधाएं।‍ 12. ऄनुुंधान‍प्रयजगिाला‍ 13 डाटा‍ुेंटर ग.‍जाकाु‍जनयत्रं ण‍मानदडं ताजलका 22.62 डाक‍और‍दरू -ुचं ार‍ुजु ाधाए ं ईपयजग‍पररुर ुख्ं या न्यनू तम‍ ऄजधकतम‍ एफए न्यनू तम‍ उंचाइ प्लॉट‍ ग्राईंड‍कारेज अर मागाजव ध (मी.) क्षत्रे फल कार‍ (मी.) स्ट्थानीय‍स्ट्तर जनुंख्या‍10000‍तक 1 पी‍एां‍टी‍ुुजाधा‍(टाआप-I) मनजरंजनात्मक‍ईपयजग‍क्षेत्र‍कज‍छजड़कर, लाग‍ूनूीं ऄपेक्षानुुार‍ुभी‍ईपयजग‍क्षेत्रों‍में/जमजश्रत‍ ईपयजग‍के‍तूत‍यू‍ऄनुमत‍ू‍,दक‍ल-े अईट‍प्लान‍ में‍कजइ‍जाजिष्ट‍स्ट्थल‍अरजक्षत‍नूीं‍रखा‍जाएगा। िूरी‍स्ट्तर जनुंख्या‍2000000‍तक 2 पी‍एां‍टी‍ुुजाधा‍(टाआप-II) 2 2500 ागव‍ 30% 120 18 26 मी. 3 पी‍एां‍टी‍ुुजाधा‍‍ अाश्यक अाश्यकता‍ 35% 150 18 26 (टाआप-III) ता‍ ऄनुुार ऄनुुार252 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] नजटः प्लॉट‍के‍अकार‍में‍10%‍तक‍का‍ऄतं र‍ूजने‍की‍ऄनुमजत‍ू।, ऄन्य‍जनयत्रं ण: i) पी‍एां‍टी‍ुुजाधा‍(टाआप‍II)‍के‍जलए,‍अााुीय‍घटक‍और‍ऄन्य‍ ‍ुूायक‍ुुजाधाओं‍के‍जलए‍15% तक‍एफ‍ ए‍अर‍ऄनुमत‍ू।, ii) ‍पी‍एां‍टी‍ुुजाधा‍(टाआप‍III)‍के‍जलए,‍छात्रों‍के‍जलए‍ूॉस्ट्‍टल‍अााु‍और‍ऄजनाायव‍स्ट्‍टाफ‍के‍अााुीय‍ ईपयजग‍के‍जलए‍30% तक‍एफ‍ए‍अर‍ऄनुमत‍ू।, 22.15.4 ुरु क्षा-पजु लु‍ुजु ाधाए ं क. ईपयजग‍पररुर‍एा‍ंपररभाीाए ाँ ताजलका‍22.63‍ईपयजग‍पररुर‍एा‍ंपररभाीा‍-‍ुरु क्षा-पजु लु‍ुजु ाधाए ं क्र.ु.ं ईपयजग‍पररुर पररभाीा ऐुा‍पररुर‍जूां‍यातायात‍और‍ुंबंजधत‍मुद्दों‍के‍प्रबंधन‍की‍ 1 र,दफक‍कंरजल‍रूम ुुजाधाओं‍ााली‍ऄस्ट्थायी‍ुंरचनाएं‍ू।ैं ऐुा‍पररुर‍जूां‍काननू ‍और‍्ास्ट्था‍का‍प्रबंधन‍करन‍े ूते ‍ु 2 पुजलु‍चौकी लजगों‍और‍ईपकरणों‍के‍जलए‍ऄस्ट्थायी‍‍ुरं चनाएं‍ू।ैं ‍‍ ऐुा‍पररुर‍जूां‍पुजलु‍स्ट्टेिन‍की‍तुलना‍में‍ऄस्ट्थायी‍स्ट्ारूप‍ की‍या‍ऄपेक्षाकृत‍छजटे‍प,मान‍े की‍स्ट्थानीय‍पुजलु‍चौकी‍के‍ 3 पुजलु‍पजस्ट्ट जलए‍ुुजाधा‍ू।, ऐुा‍पररुर‍जूां‍स्ट्थानीय‍पुजलु‍चौकी‍‍के‍कायावलयों‍के‍जलए‍ 4 पुजलु‍स्ट्टेिन ुुजाधाएं‍ू।ैं ऐुा‍पररुर‍जूा‍ं कायावलयों‍और‍ऄधवु,जनक‍बलों‍के‍जलए‍ 5 जजला‍पुजलु‍कायावलय‍और‍बटाजलयन ुुजाधाएं‍ू।ैं ‍‍ ऐुा‍पररुर‍जूां‍ऄधवु,जनक‍बलों‍के‍कायव‍के‍जलए‍और‍अााु‍ 6 पुजलु‍लाआन ूते ु‍ुुजाधाएं‍ू।ैं ‍ ऐुा‍पररुर‍जूां‍काननू ‍के‍तूत‍ऄपराजधयों‍कज‍क,द‍करने, 7 जेल काराााु‍और‍ुुधार‍के‍जलए‍ुजु ाधाएं‍ू।ैं ‍ ऐुा‍ पररुर‍ जूां‍ ऄधवु,जनक‍ बलों‍ के‍ प्रजिक्षण‍ के‍ जलए‍ 8 पुजलु‍प्रजिक्षण‍ुंस्ट्थान‍/‍कॉलजे ुुजाधाएं‍ू।ैं ऐुा‍पररुर‍जूां‍ऄधवु,जनक‍बलों‍ूते ‍ु ‍फायररग‍ऄभ्याु‍के‍ 9 पुजलु‍फायररग‍रेंज जलए‍ुुजाधाएं‍ू।ैं ‍ ऐुा‍ पररुर‍ जूां‍ अंतररक‍ रक्षा‍ ूते ु‍ जुजाल‍ ुंगठन‍ के‍ 10 जुजाल‍जडफेंु‍और‍ूजमगाडव‍अदद। कायावलयों‍और‍ऄन्य‍कायों‍के‍जलए‍ुुजाधाएं‍ू।ैं ऐुा‍पररुर‍जूा‍ं जचदकत्ुा‍ज्ञान‍के‍ऄनप्रु यजग‍के‍जलए‍ुुजाधा‍ 11 फजरेंजुक‍जाज्ञान‍प्रयजगिाला ू।, ऐुा‍पररुर‍जूां‍राष्ट्रीय‍ुरु क्षा‍ुंबंधी‍ऄथाा‍ुमय-ुमय‍पर‍ 12 राष्ट्रीय‍ुुरक्षा‍प्रजतष्ठान भारत‍ुरकार‍द्वारा‍यथा‍पररभाजीत/ऄजधुूजचत‍‍प्रजतष्ठान‍ जस्ट्थत‍ू।ैं[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 253 ख. ऄनमु ये ‍गजतजाजधया ं ताजलका 22.64 ईपयजग‍पररुर‍एा‍ंऄनमु त‍गजतजाजधया‍ं-‍ुरु क्षा-पजु लु‍ुजु ाधाए ं #क्र.ु.ं ईपयजग‍जजन‍ अरडी पीएु1 ईपयजग‍ 1 2 3 4 5 6 पररुर र,दफक‍ पजु लु‍चौकी पजु लु‍पजस्ट्ट पजु लु‍स्ट्टेिन जजला‍पजु लु‍ पजु लु‍ कंरजल‍रूम कायालव य‍और‍ लाआन बटाजलयन ऄनमु त‍ गजतजाजधया ं 1. कमवचाररयों‍के‍    जलए‍अााु 2. कैंटीन      3. बैंक‍एक्ुटेंिन‍    काईंटर 4. छात्राााु  5. खेल‍का‍म,दान  6. आनडजर‍गेम्ु‍की‍   ुुजाधा 7. एनुीअर‍(ग,र- ुंज्ञेय‍ररपजट)व ‍की‍ ररकॉर्मडग‍और‍ अपातकालीन‍  ईपकरणों‍के‍ भंडारण‍के‍जलए‍ ुुजाधाओं‍के‍ुाथ‍ ऄजधकारी‍कक्ष 8. िौचालय‍और‍ स्नान‍ुुजाधाओं‍   और‍रुजइ‍के‍ुाथ‍ डजरमेरी 9. ुंचार‍केंद्र   10. ुर्नाु‍ाकविॉप   11. धार्नमक‍ुुजाधा   12. ाेंलडग‍‍   बूथ/क्य‍ जस्ट्‍क 13. ााचनालय‍/‍   पुस्ट्तकालय254 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] #क्र.ु.ं ईपयजग‍जजन‍ अरडी पीएु1 ईपयजग‍ 1 2 3 4 5 6 पररुर र,दफक‍ पजु लु‍चौकी पजु लु‍पजस्ट्ट पजु लु‍स्ट्टेिन जजला‍पजु लु‍ पजु लु‍ कंरजल‍रूम कायालव य‍और‍ लाआन बटाजलयन ऄनमु त‍ गजतजाजधया ं 14. ग,र-्ााुाजयक‍ ईपयजग‍के‍जलए‍   दफटनेु‍ुेंटर #क्र.ुं. ईपयजग‍जजन‍ पीएु1 ईपयजग‍ 7 8 9 10 11 12 पररुर जजला‍जले पजु लु‍ पजु लु‍फायररग‍ जुजाल‍ फजरेंजुक‍ राष्ट्रीय‍ प्रजिक्षण‍ रेंज जडफेंु‍और‍ जाज्ञान‍ ुरु क्षा‍ ुस्ट्ं थान‍/‍ ूजमगाड‍व प्रयजगिाला प्रजतष्ठान ऄनमु त‍ कॉलजे अदद। गजतजाजधया ं 1. कैंटीन‍      2. बैंक‍एक्ुटेंिन‍    काईंटर‍ 3. छात्राााु‍     4. खेल‍का‍म,दान‍/‍     खेल‍की‍ुुजाधा‍ 5. कमवचाररयों‍के‍      जलए‍अााु 6. प्रत्येक‍20‍ाग‍व मीटर‍क्षेत्र‍की‍     खुदरा‍दकु ान‍ 7. ऑजडटजररयम  8. जस्ट्ालमग‍पलू   9. डाकघर‍काईंटर‍  की‍ुुजाधा 10. प्राथजमक‍जचदकत्ुा‍  ुुजाधा[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 255 #क्र.ुं. ईपयजग‍जजन‍ पीएु1 ईपयजग‍ 7 8 9 10 11 12 पररुर जजला‍जले पजु लु‍ पजु लु‍फायररग‍ जुजाल‍ फजरेंजुक‍ राष्ट्रीय‍ प्रजिक्षण‍ रेंज जडफेंु‍और‍ जाज्ञान‍ ुरु क्षा‍ ुस्ट्ं थान‍/‍ ूजमगाड‍व प्रयजगिाला प्रजतष्ठान ऄनमु त‍ कॉलजे अदद। गजतजाजधया ं 11. अपातकालीन‍ ब,कऄप‍/‍अपदा‍  की‍त,यारी 12. ाॉच‍और‍ााडव‍ रेजजडेंु‍(20 ागव‍       मीटर‍तक) 13. ुंचार‍केंद्र‍    (ऄस्ट्थायी) 14. ााचनालय‍/‍ पुस्ट्तकालय    15. ग,र-‍्ााुाजयक‍ ईपयजग‍के‍जलए‍    दफटनेु‍ुेंटर 16. दकयजस्ट्क    17. स्ट्ा,जच्छक‍स्ट्ाास्ट््य‍    ुेााएं #क्र.ुं. ईपयजग‍जजन‍ पीएु‍1 ईपयजग‍पररुर 13 14 15 केंद्रीय‍पजु लु‍ुगं ठन ुरु क्षा‍बल‍जिजार पजु लु‍कैंप ऄनमु त‍गजतजाजधया ं 1. बैंक‍एक्ुटेंिन‍काईंटर    2. छात्राााु‍    3. 20‍ागव‍मीटर‍क्षेत्र‍की‍खुदरा‍दकु ान    4. जस्ट्ालमग‍पलू    5. ुंचार‍केंद्र    6. ्यान‍/‍अ्याजत्मक‍प्रजिक्षण‍के‍जलए‍    ुुजाधाएं256 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] #क्र.ुं. ईपयजग‍जजन‍ पीएु‍1 ईपयजग‍पररुर 13 14 15 केंद्रीय‍पजु लु‍ुगं ठन ुरु क्षा‍बल‍जिजार पजु लु‍कैंप ऄनमु त‍गजतजाजधया ं 7. ग,र-्ााुाजयक‍ईपयजग‍के‍जलए‍    दफटनेु‍ुेंटर 8. कमवचाररयों‍के‍जलए‍अााु    9. छात्राााु    10. ऄस्ट्पताल‍/‍नर्मुग‍/‍प,रामेजडक‍    ुुजाधा 11. पालतू‍पि‍ु और‍जानारों‍के‍जलए‍पि‍ु    जचदकत्ुा‍ऄस्ट्पताल 12. निामुजि ‍/‍पनु ाावु‍केंद्र    13. कैंटीन    ग. जाकाु‍जनयत्रं ण‍मानदडं ताजलका 22.65 ुरु क्षा-पजु लु‍ुजु ाधाए ं न्यनू तम‍भखू डं ‍ ऄजधकतम‍ न्यनू तम‍ क्र.ुं एफएअ उंचाइ ईपयजग‍पररुर ुख्ं या क्षत्रे ‍(ाग‍व ग्राईंड‍ मागाजव धका . र (मी.) मी.)/यजू नट कारेज (%) र‍(मी.) स्ट्थानीय‍स्ट्तर जनुंख्या‍10000‍तक स्ट्थल‍की‍्ाूायवता‍के‍अधार‍पर‍ुड़क‍के‍ र,दफक‍और‍ अाश्यकतानुुा मागावजधकार‍के‍रूप‍म,ें‍प्रमुख‍ुड़क‍ 1 पजु लु‍कंरजल‍ र‍ुभी‍ईपयजग‍ जंक्िनों/जूस्ट्ुों‍अदद‍पर‍अाश्यकता‍के‍ --- रूम पररुरों/जजन‍म‍ें ऄनुुार। ऄनुमेय‍और‍ 2. ऄजधकतम‍क्षेत्र‍= 25 ागव‍मी. अाश्यकतानुुा र‍स्ट्कीम‍म‍ेंप्रदान‍ 2 की‍जाएंगी। 150‍तक 75% 300 18 मी. पजु लु‍चौकी ुामदु ाजयक‍स्ट्तर जनुंख्या‍100,000‍तक‍ 1 पजु लु‍पजस्ट्ट 1 2500‍तक 50% 300 18 मी.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 257 न्यनू तम‍भखू डं ‍ ऄजधकतम‍ न्यनू तम‍ क्र.ुं एफएअ उंचाइ ईपयजग‍पररुर ुख्ं या क्षत्रे ‍(ाग‍व ग्राईंड‍ मागाजव धका . र (मी.) मी.)/यजू नट कारेज (%) र‍(मी.) ईप-िूरी‍स्ट्तर जनुंख्या‍500,000‍तक 1 पजु लु‍स्ट्टेिन 2 1 ूक्े टेयर‍तक 50 300 18 मी. िूरी‍स्ट्तर जनुंख्या‍20,00,000‍तक 1 प्रजत‍50.0 1 जजला‍जले 2 ूक्े टेयर‍तक 50 300 18 मी. लाख 2 पजु लु‍लाआंु जजला‍पजु लु‍ अाश्यकता‍के‍ 1 ूक्े टेयर‍तक 50 300 18 मी. 3 कायालव य‍और‍ ऄनुुार बटाजलयन पजु लु‍प्रजिक्षण‍ 4 ुस्ट्ं थान‍/‍कॉलजे अाश्यकता‍के‍ पजु लु‍फायररग‍ 5‍ूक्े टेयर‍तक 50 300 18 मी. 5 ऄनुुार रेंज 6 पजु लु‍कैंप ऄन्य‍जनयत्रं ण i. क्षेत्रीय‍जाकाु‍यजजनाओं‍म‍ें ददए‍गए‍ऄन्य‍प्रााधानों‍के‍ुाथ‍ज़जन‍ओ‍म‍ें ईपयजग‍पररुरों‍और‍जजन‍ुी‍तथा‍ज़जन‍ डी‍के‍बगं ला‍क्षेत्र‍के‍जलए‍‍ऄजधकतम‍एफएअर 120‍ूजगा। ii. ुुरक्षा-पुजलु‍ुुजाधाओं‍के‍मामल‍े म,ें ुभी‍ईपयजग‍पररुरों‍के‍जलए, अााुीय‍और‍ऄनुमत‍गजतजाजधयां‍के‍जलए‍ ऄजधकतम‍ऄनुमेय 30%‍एफएअर‍की‍ऄनुमजत‍दी‍जा‍ुकती‍ू‍, ज,ुा‍दक‍उपर‍ताजलका‍में‍ददया‍गया‍ू।, ‍ अााुीय‍घटक‍अााुीय‍प्लॉट-ुमूू ‍अााु‍के‍ऄनुुार‍ूजगा। iii. राष्ट्रीय‍ुुरक्षा‍प्रजतष्ठान‍ज,ुे‍ईपयजग‍पररुर‍की‍ऄनुमजत‍ईपयि ुव ‍ताजलका‍में‍ार्नणत‍श्रेजणयों‍के‍भीतर‍दी‍जाएगी। iv. ईपयुवक्‍त‍प्ल‍ ॉटों‍के‍जलए‍एएअइ,‍ददल्ल‍ ी‍ऄजग्नश्‍मन‍ुेाा‍और‍ऄन्‍य‍ुांजाजधक‍जनकायों‍ुे‍मजं ूरी‍जमल‍जान‍े पर‍ कजइ‍उाँचाइ‍प्रजतबंध‍नूीं‍ूजगी।‍‍258 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 22.15.5 ऄजग्न-ुरु क्षा‍ुजु ाधाए ाँ क. ईपयजग‍पररुर‍एा‍ंपररभाीाए ाँ ताजलका 22.66 ईपयजग‍पररुर‍एा‍ंपररभाीा‍-‍ऄजग्न-ुरु क्षा‍ुजु ाधाए ाँ क्र.ु.ं ईपयजग‍पररुर पररभाीा 1 फायर‍पजस्ट्ट ऄजग्निमन‍की‍कम‍ुुजाधाओं‍ााला‍पररुर।‍यू‍पजस्ट्ट‍ऄजग्न‍ ुंभाजात‍गजतजाजधयों‍ााले‍जाजिष्ट‍पररुर‍ुे‍जजड़ा‍जा‍ ुकता‍ू।, 2 दमकल‍केंद्र ऐुा‍पररुर‍जूां‍आुके‍जनकटाती‍क्षेत्र‍के‍जलए‍ऄजग्निमन- ुुजाधा‍ूज।‍आुमें‍अाश्यक‍कमवचाररयों‍का‍अााु‍िाजमल‍ ू।, 3 ऄजग्न‍प्रजिक्षण‍ुंस्ट्थान ऐुा‍पररुर‍जूां‍अग‍लगने, भान‍जगरने‍अदद‍की‍जस्ट्थजत‍ में‍ अपातकालीन‍ ुमय‍ में‍ जस्ट्थजत‍ ुे‍ जनपटन‍े के‍ जलए‍ प्रजिक्षण‍की‍ुुजाधाएं‍ू।, 4 अपदा‍प्रबधं न‍केंद्र ऐुा‍पररुर‍जूा‍ं अपदा‍अपातकाजलक‍ब,कऄप-ुुजाधा, ऄस्ट्पताल‍की‍ुुजाधा, अपदा‍की‍त,यारी‍के‍जलए‍प्रजिक्षण‍ केंद्र, ाायरलेु‍कम्यूजनकेिन‍अदद‍‍की‍ुुजाधा‍ू।, 5 अपदा‍प्रबधं न‍आकाआयााँ ऐुा‍पररुर‍जूा‍ं अपदा‍प्रबधं न‍के‍मुद्दों‍पर‍कारवााइ‍करने‍ ााले‍ या‍ ुमय-ुमय‍ पर‍ भारत‍ ुरकार‍ द्वारा‍ यथा‍ पररभाजीत/ऄजधुूजचत‍प्रजतष्ठान‍ू।ैं ‍‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 259 ख. ऄनमु ये ‍गजतजाजधया ं ताजलका 22.67 ईपयजग‍पररुर‍एा‍ंऄनमु त‍गजतजाजधया‍ाँ-‍ऄजग्न-ुरु क्षा‍ुजु ाधाए ाँ क्र.ुं ईपयजग‍जजन पीएु1 . ईपयजग‍पररुर 1 2 3 4 5 फायर‍ दमकल‍केंद्र ऄजग्न‍प्रजिक्षण‍ अपदा‍प्रबधं न‍केंद्र अपदा‍प्रबधं न‍ ऄनमु त‍ पजस्ट्ट ुस्ट्ं थान आकाआया ाँ गजतजाजधया ं कमवचाररयों‍के‍जलए‍ 1.      अााु 2. ुर्नाु‍ाकविॉप   3. छात्राााु   4. दमकल‍केंद्र   5. ाॉच‍और‍ााडव‍रेजजडेंु    (20‍ाग‍वमीटर‍तक) 6. स्ट्ाास्ट््य‍देखभाल‍ुुजाधा   7. ऄभ्याु‍और‍राूत‍ जिजार‍/‍अपदा‍त,यारी‍के‍    जलए‍खुल‍ेऄभ्याु‍म,दान 8. ुंचार‍केंद्र    ऄस्ट्थायी 9. प्राथजमक‍जचदकत्ुा‍  ुुजाधा 10. अपातकालीन‍ब,कऄप  11. कैंटीन      12. बैंक‍एक्ुटेंिन‍काईंटर     13. र,न‍बुेरा  14. ाेंलडग‍बथू /क्य‍ जु‍क्‍   15. ााचनालय‍/‍पुस्ट्तकालय   260 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] क्र.ुं ईपयजग‍जजन पीएु1 . ईपयजग‍पररुर 1 2 3 4 5 फायर‍ दमकल‍केंद्र ऄजग्न‍प्रजिक्षण‍ अपदा‍प्रबधं न‍केंद्र अपदा‍प्रबधं न‍ ऄनमु त‍ पजस्ट्ट ुस्ट्ं थान आकाआया ाँ गजतजाजधया ं 16. आनडजर‍गेम्ु‍की‍ुुजाधा   17. ग,र-्ााुाजयक‍ईपयजग‍     के‍जलए‍दफटनेु‍ुेंटर ग. जाकाु‍जनयत्रं ण‍मानदडं ताजलका 22.68 ऄजग्न-ुरु क्षा‍ुजु ाधाए ाँ न्यनू तम‍भखू डं ‍ ऄजधकतम‍ न्यनू तम‍ ईपयजग‍ एफएअ क्र.ु.ं ुख्ं या क्षत्रे ‍(ाग‍वमी.)/‍ ग्राईंड‍ मागाजव धकार‍ उंचाइ‍(मी.) पररुर‍ र यजू नट कारेज (%) (मी.) ुामदु ाजयक‍स्ट्तर जनुंख्या‍100,000‍तक‍ 2500 ागव‍ 1 फायर‍पजस्ट्ट 1 50% 300 18 मी. मीटर‍तक ईप-िूरी‍स्ट्तर जनुंख्या‍500,000‍तक‍ 1‍ूक्े टेयर‍ 1 दमकल‍केंद्र 2 50 300 18 मी. तक अपदा‍प्रबधं न‍ 5000- 2 1 50 300 18 मी. आकाइ 10000 िूरी‍स्ट्तर जनुंख्या‍20,00,000‍तक ऄजग्न‍प्रजिक्षण‍ अाश्यकता‍के‍ 5‍ूक्े टेयर‍ ुस्ट्ं थान 50 300 18 मी. 1 ऄनुुार तक अपदा‍प्रबधं न‍ अाश्यकता‍के‍ 5‍ूक्े टेयर 2 50 300 18 मी. केंद्र ऄनुुार तक[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 261 ऄन्य‍जनयत्रं ण i. ददल्ली‍ऄजग्निमन‍ुेाा‍(डीएफएु)‍अग‍के‍खतरे‍ााल‍े क्षेत्रों‍की‍पूचान‍करेगी‍और‍ऄजग्निमन‍ुेााओं‍(ऄजग्न- िमन‍केंद्र/‍ऄजग्न-िमन‍चौकी)‍की‍के‍स्ट्थान‍की‍पूचान‍आु‍तरू‍की‍जाएगी‍दक‍यू‍ुमुदाय‍कज‍ऄजग्न‍ुरु क्षा‍ ुेााएं‍प्रदान‍करन‍े में‍युजि ुंगत‍ढंग‍ुे‍लाभकारी‍ूज। ii. क्षेत्रीय‍जाकाु‍यजजनाओं‍में‍ददए‍गए‍ऄन्य‍प्रााधानों‍के‍ुाथ‍जजन‍ओ‍में‍ईपयजग‍पररुरों‍और‍जजन‍ुी‍तथा‍जजन‍ डी‍के‍बगं ला‍क्षेत्र‍के‍जलए‍ऄजधकतम‍एफएअर 120‍ूजगा। iii. ऄजग्न-ुुरक्षा‍ुुजाधाओं‍के‍मामले‍म,ें ुभी‍ईपयजग‍पररुरों‍के‍जलए, अााुीय‍और‍ऄनुमत‍गजतजाजधयां‍के‍जलए‍ ऄजधकतम‍30%‍ऄनुमेय एफएअर‍की‍ऄनुमजत‍दी‍जा‍ुकती‍ू‍, ज,ुा‍दक‍उपर‍ताजलका‍में‍ददया‍गया‍ू।, ‍ अााुीय‍घटक‍अााुीय‍प्लॉट-ुमूू‍अााु‍के‍ऄनुुार‍ूजगा।‍ iv. ईपयुवक्‍त‍प्ल‍ ॉटों‍के‍जलए‍एएअइ,‍ददल्ल‍ ी‍ऄजग्नश्‍मन‍ुेाा‍और‍ऄन्‍य‍ुांजाजधक‍जनकायों‍ु‍े मजं ूरी‍जमल‍जान‍े पर‍ कजइ‍उाँचाइ‍प्रजतबंध‍नूीं‍ूजगी।‍‍ 22.15.6 जातरण‍यजग्य‍ुजु ाधाए ं क. ईपयजग‍पररुर‍एा‍ंपररभाीाए ाँ ताजलका‍22.69‍ईपयजग‍पररुर‍एा‍ंपररभाीा – जातरण‍यजग्य‍ुजु ाधाए ं क्र.ु.ं ईपयजग‍पररुर पररभाीा‍ 1 दधू ‍बूथ‍/‍दधू , फल‍और‍ुब्जी‍बूथ‍ स्ट्थानीय‍अबादी‍कज‍द,जनक‍दकराने‍के‍ुामान‍की‍अपूर्नत‍के‍जलए‍बुजनयादी‍ /‍ददल्ली‍दग्ु ध‍अपूर्नत‍बूथ‍/‍ईजचत‍ ुुजाधा‍ााला‍पररुर। मूल्य‍की‍दकु ान 2 बुककग‍कायावलय‍ुजूत‍एलपीजी‍ स्ट्थानीय‍अबादी‍कज‍एलपीजी‍की‍बुककग, भंडारण‍और‍अपूर्नत‍के‍जलए‍ गजदाम पररुर। ग,ु‍गजदाम एलपीजी,‍गजदाम,‍अदद‍के‍थजक‍भंडारण‍की‍ुुजाधा‍ााला‍पररुर। 3 ख. ऄनमु ये ‍गजतजाजधया ं ताजलका‍22.70‍ईपयजग‍पररुर‍एा‍ंऄनमु त‍गजतजाजधया ाँ– जातरण‍यजग्य‍ुजु ाधाए ं ईपयजग‍जजन‍ पीएु‍1 अरडी क्र.ु.ं ईपयजग‍ 1 2 3 पररुर गु, ‍गजदाम बकु कग‍कायालव य‍ दधू ‍बथू ‍/‍दधू , फल‍और‍ुब्जी‍ ुजूत‍एलपीजी‍ बथू ‍/‍ददल्ली‍दग्ु ध‍अपर्नू त‍बथू ऄनमु ये ‍गजतजाजधया ं गजदाम‍ 1. डेयरी‍ईत्पादों‍/‍फलों‍और‍  ुजब्जयों‍अदद‍की‍जबक्री‍एां‍ प्रदिवन‍के‍जलए‍बूथ‍/‍जनर्नमत‍ ुंरचना।‍262 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 2. ाॉच‍एंड‍ााड‍वरेजजडेंु‍(20‍   ागवमीटर‍तक) 3. बुककग‍कायावलय  4. स्ट्टजर‍/‍गजदाम   5. केयर‍टेकर‍कायावलय  नजटः 1. बुककग‍कायावलय‍एा‍ं गजदाम:‍अााुीय‍और‍मनजरंजनात्मक‍ईपयजग‍जजनों‍कज‍छजड़कर‍ुभी‍ईपयजग‍जजनों‍ म‍ें ऄनुमत। 2. ुभी‍ईपयजग‍जजनों‍म‍ेंएलपीजी‍बुककग‍कायावलय‍कज‍ऄनुमजत‍दी‍जा‍ुकती‍ू।, ग. जाकाु‍जनयत्रं ण‍मानदडं ताजलका‍22.71‍जातरण‍यजग्य‍ुजु ाधाए ं क्र.ु.ं ईपयजग‍पररुर‍ ुख्ं या न्यनू तम‍ ऄजधकतम‍ एफएअर न्यनू तम‍ उंचाइ भखू डं ‍क्षत्रे ‍ ग्राईंड‍कारेज मागाजव धकार‍ (मी.) (ाग‍वमी.) (मी.) 1 दधू ‍बूथ‍/‍दधू , फल‍और‍ प्रजत‍5000 i. ुंबंजधत‍जाभाग‍के‍मानक‍जडजाआन‍के‍ऄनुुार ुब्जी‍बूथ‍/‍ददल्ली‍दग्ु ध‍ जनुंख्या‍पर‍ अपूर्नत‍बथू ‍/‍ईजचत‍मूल्य‍ एक ii. स्ट्ाीकृत‍लअे ईट‍यजजना‍के‍ऄनुु ार ुभी‍जजनों‍में‍ऄनुमत। की‍दकु ान 2 बुककग‍कायावलय‍ुजूत‍ अाश्‍यकता‍के‍ i. प्लॉट‍का‍अकार‍- बुककग‍कायावलय‍और‍ुुरक्षा‍कक्ष‍ुजूत‍ एलपीजी‍गजदाम‍ ऄनुुार‍ 600 ागव‍मीटर‍तक। ii. अााुीय‍और‍मनजरंजनात्मक‍ईपयजग‍जजनों‍कज‍छजड़कर‍ ुभी‍ईपयजग‍जजनों‍म‍ेंुांजाजधक‍मंजूरी‍की‍ितव‍पर‍ऄनुमत‍। ऄन्य‍जनयत्रं ण: 1. दधू , फल, ुब्जी‍और‍रुजइ‍गु, ‍ददन-प्रजतददन‍के‍जीान‍की‍मूलभूत‍जरूरतें‍ू ैं और‍आनका‍ईजचत‍जातरण‍ ुेट-ऄप‍ूजना‍चाजूए। 2. इडब्ल्यूएु‍/‍एलअइजी‍अााु‍/‍पुनाावु‍कॉलजजनयों‍के‍पाु‍ईजचत‍मूल्य‍की‍दकु ानें‍‍ूज‍ुकती‍ू।ैं 3. एलपीजी‍गजदामों‍के‍जलए‍मानदंड‍और‍मानक‍पीइएुओ‍(पेरजजलयम‍और‍जास्ट्‍फजटक‍ुुरक्षा‍ुंगठन)‍के‍ ऄनुुार‍ूोंगे।‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 263 22.15.7‍ुामाजजक-ुास्ट्ं कृजतक‍ुजु ाधाए ं क. ईपयजग‍पररुर‍एा‍ंपररभाीाए ाँ ताजलका 22.72‍ईपयजग‍पररुर‍एा‍ंपररभाीा‍-‍ुामाजजक-ुास्ट्ं कृजतक‍ुजु ाधाए ं क्र.ु.ं ईपयजग‍पररुर पररभाीा 1 ुामाजजक-ुांस्ट्‍कृजतक‍ुुजाधा‍(टाआप-I) स्ट्‍थानीय‍ स्ट्‍तर‍ की‍ ुामाजजक‍ ुांस्ट्‍कृजतक‍ गजतजाजधयां,‍ ऄजधगम(ुंगीत,‍कला‍अदद,‍खेल‍कूद,‍परस्ट्‍पर‍ुंपकव‍ब,ठक‍ और‍एकत्र‍ूजने‍के‍स्ट्थ‍ ल‍‍(ऄथावत्‍बैंकट‍ूॉल‍अदद)‍के‍जलए‍ ुुजाधाओं‍ााले‍पररुर‍ 2 ुामाजजक-ुांस्ट्‍कृजतक‍ुुजाधा‍(टाआप- II) जाजभन्‍न‍ ुामाजजक-ुांस्ट्‍कृजतक‍ गजतजाजधयों‍ के‍ जलए‍ ुुजाधाओं/प्रजिक्षण‍ुुजाधाओं‍ुजूत‍पररुर,‍जूां‍ुमुदाय‍ स्ट्‍तर‍पर‍जन-ुभा/ुमारजू‍और‍ुाावजजनक‍ुमारजू‍दकए‍ जा‍ुकते‍ू।, ‍आुमें‍ुांस्ट्‍कृजतक‍और‍ुूचना‍ुेााओं‍के‍जलए‍ ुुजाधाएं‍भी‍िाजमल‍की‍जा‍ुकती‍ू।, ‍‍(ऄथावत्‍बुएईद्देिीय‍ ुामुदाजयक‍ ूॉल,‍ ुामाजजक-ुांुकृजतक‍ ुंस्ट्‍था‍ (ऄजधगम‍ और‍ुगं ीत,‍नृत्य‍ ‍के‍प्रदिनव ,‍ऄन्‍य‍प्रदिवन‍कला,‍प्रदिनव ी‍ स्ट्‍थल,‍कला‍गल, री‍(भान),‍पस्ट्ु त‍ कालय,‍ुृजनात्‍मक‍ाकविॉप‍ (कायविालाए)‍ऑजडटजररयम,‍छजटे‍जथएटर के‍जलए‍ुुजाधाओं‍ुजूत,‍ुांस्ट्क‍ृजतक‍और‍ुूचना‍केंद्र‍अदद)‍‍‍‍ 3 ुामाजजक-ुांस्ट्‍कृजतक‍ुुजाधा‍(टाआप-III) ुांस्ट्‍कृजतक‍ और‍ ऄन्‍य‍ ुूचनात्‍मक‍ तथा‍ मनजरंजनात्‍मक‍ गजतजाजधयों‍कज‍बढ़ााा‍देने‍ााली‍ुुजाधाओं‍ुजूत‍पररुर‍ (ऄथातव ्‍मनजरंजन‍क्ल‍ ब,‍पजब्लक‍लाआब्रेरी‍अदद)‍‍‍ 4 ुामाजजक-ुांस्ट्‍कृजतक‍ुुजाधा‍(टाआप-VI) बड़ी‍ जन‍ ुभाएं‍ और‍ ुमारजू‍ जेुे‍ प्रदिवजनयों,‍ ऄन्‍तररावष्र‍ीय/राष्र‍ीय‍ ुम्‍मले न,‍ ब,ठकों,‍ ुगं जजष्ठयों‍ अदद‍ अयजजजत‍करन‍े के‍जलए‍ुुजाधाओं‍ुजूत‍पररुर/‍आनमें‍बड़ी‍ मनजरंजन/ुामाजजक‍ुांस्ट्‍कृजतक‍ुुजाधाएं‍भी‍िाजमल‍ूजगी।‍ (ऄथातव ्‍ ुामाजजक‍ –ुांस्ट्‍कृजतक‍ केंद्र,ुाआंु‍ ुेंटर,‍ प्‍ल,जनटररयम,‍म्‍यजू जयम‍(ुग्रं ूालय),‍ऄन्‍तरराष्र‍ीय‍ुम्‍मलने ‍ केंद्र‍(कन्‍ाेंिन‍ुेंटर),‍प्रदिवनी‍ुू‍मेला‍मद, ान‍‍264 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ख. ऄनमु ये ‍गजतजाजधया ं ताजलका 22.73‍ईपयजग‍पररुर‍एा‍ंऄनमु ये ‍गजतजाजधया‍ं-‍ुामाजजक-ुास्ट्ं कृजतक‍ुजु ाधाए ं ईपयजग‍जजन‍ अरडी पीएु‍1 ुामाजजक- ुामाजजक- ुामाजजक- ुामाजजक- ुांस्ट्‍कृजतक‍ ुांस्ट्‍कृजतक‍ क्रम‍ु.ं ईपयजग‍पररुर ुांस्ट्‍कृजतक‍ ुांस्ट्‍कृजतक‍ुुजाधा‍ ुुजाधा‍(टाआप- ुुजाधा‍(टाआप- ुुजाधा‍(टाआप-I) (टाआप-III) II)) IV) ऄनमु त‍गजतजाजधया‍ं 1 2 3 4 1 कैंटीन 2 बैंक‍एक्ुटेंिन‍काईंटर 3 ाेलडग‍बथू /दकयजस्ट्‍क‍ 4 रेस्ट्‍टजरंट‍ जनगरानी‍अााु‍(20‍ाग‍वमी.‍ 5 तक)‍ 6 प्रदिवनी‍ुेंटर‍और‍अट‍वगल, री‍ 7 ुामुदाजयक‍केंद्र‍ 8 ूॉस्ट्‍टल‍ ुंगीत, नृत्य‍और‍नाटक‍ 9 प्रजिक्षण‍केंद्र 10 पुस्ट्तकालय 11 ऑजडटजररयम ुाावजजनक‍ुमारजूों, जाााूों, खाना‍पकाने‍की‍ुुजाधाओं‍ 12 और‍ऄन्य‍ुुजाधाओं‍के‍जलए‍ ूॉल 13 ुंग्रूालय 14 एटीएम 15 स्ट्‍ाास्ट्‍्‍य‍देखरेख‍ुुजाधा‍ 16 व्‍याुाजयक‍कायावलय‍ 17 ूजटल‍ 18 पुजलु‍चौकी‍ 19 ऄजग्नश्‍मन‍चौकी‍ रख-रखाा‍स्ट्‍टाफ‍के‍जलए‍ 20 अााु ओपन‍ऐयर‍ 21 जथयेटर/एम्‍फीजथयेटर‍‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 265 ईपयजग‍जजन‍ अरडी पीएु‍1 ुामाजजक- ुामाजजक- ुामाजजक- ुामाजजक- ुांस्ट्‍कृजतक‍ ुांस्ट्‍कृजतक‍ क्रम‍ु.ं ईपयजग‍पररुर ुांस्ट्‍कृजतक‍ ुांस्ट्‍कृजतक‍ुुजाधा‍ ुुजाधा‍(टाआप- ुुजाधा‍(टाआप- ुुजाधा‍(टाआप-I) (टाआप-III) II)) IV) ऄनमु त‍गजतजाजधया‍ं 1 2 3 4 22 मेला‍म,दान‍ कन्‍ािें न‍और‍ब,ठक‍ 23 स्ट्‍थान/कन्‍ाेंिन‍ुेंटर‍ 24 दफल्‍म‍ुेंटर‍ बुएईद्देश्‍य‍प्रजिक्षण‍और‍ब,ठक‍ 25 कक्ष‍ 26 खुदरा‍दकु ान‍ 28 ऄजतजथ‍गृू/ऄजतजथ‍कक्ष‍ 29 आंडजर/ अईटडजर‍खेल‍ 30 स्ट्‍ाीलमग‍पलू ‍ ग. जाकाु‍जनयत्रं ण‍मानदडं ताजलका 22.74‍ुामाजजक-ुास्ट्ं कृजतक‍ुजु ाधाए ं न्यनू तम‍भखू डं ‍ ऄजधकतम‍ न्यनू तम‍ क्र.ुं एफए उंचाइ ईपयजग‍पररुर‍ ुख्ं या क्षत्रे ‍(ाग‍वमी.)/‍ ग्राईंड‍ मागाजव धकार‍ . अर (मी.) यजू नट कारेज (%) (मी.) स्ट्थानीय‍स्ट्तर जनुंख्या‍10000‍तक ुामाजजक- 1 ुांस्ट्‍कृजतक‍ुुजाधा‍ 800-2000 30% 150 12 (टाआप-I) ुामदु ाजयक‍स्ट्तर जनुंख्या‍100,000‍तक‍266 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] न्यनू तम‍भखू डं ‍ ऄजधकतम‍ न्यनू तम‍ क्र.ुं एफए उंचाइ ईपयजग‍पररुर‍ ुख्ं या क्षत्रे ‍(ाग‍वमी.)/‍ ग्राईंड‍ मागाजव धकार‍ . अर (मी.) यजू नट कारेज (%) (मी.) ुामाजजक- 2 ुांस्ट्‍कृजतक‍ुुजाधा‍ 2 1000 40% 120 24 - (टाआप-II)‍ ईप-िू री‍स्ट्तर जनुंख्या‍500,000‍तक‍ ुामाजजक- 3 ुांस्ट्‍कृजतक‍ुुजाधा‍ 1 5000 40% 120 24 - (टाआप-III) िूरी‍स्ट्तर जनुंख्या‍2,00,0000‍तक‍ 4 ुामाजजक- 35% ुांस्ट्‍कृजतक‍ुुजाधा‍ ऄपेक्षानुुार‍ ऄपेक्षानुुार‍ + 5% 120 30 (टाआप-IV) (एमएल ुीपी) नजटः * प्रदिवनी-एा-ं मेला‍म,दान, ज,ुी‍गजतजाजधयों‍के‍जलए‍ऄजधकतम‍ग्राईंड‍कारेज‍20% और एमएलुीपी‍के‍जलए‍ ग्राईंड‍कारेज‍5% और‍ऄजधकतम‍एफएअर‍20‍ूजगा। ऄन्य‍जनयत्रं ण: i. एलबीजेड‍एररया, जुजाल‍लाआन्ु‍बंग्लज‍एररया, मनजरंजनात्मक‍ईपयजग‍जजन‍में‍और‍धरजूर‍ुंरचनाओं‍पर‍मौजूद‍ मनजरंजक‍क्लबों‍का‍ईनुे‍ुंबंजधत‍मामलों‍के‍अधार‍पर‍जनपटान‍दकया‍जाएगा‍और‍दद.जा.प्रा.‍की‍टेदक्नकल‍कमेटी‍ मौजूदा‍जस्ट्थजत‍के‍अधार‍पर‍जाकाु‍जनयंत्रण‍मानदंड़ों‍कज‍मंजरू ी‍देगी।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 267 ii. खुले‍क्षेत्रों‍में‍अईटडजर‍गेम्‍ु/खेल-कूद‍ुुजाधाओं, जस्ट्ालमग‍पूल‍के‍ऄलााा‍300 ागव‍मीटर‍तक‍के‍क्षेत्र‍कज‍ग्राईंड‍ कारेज‍ुे‍मुि ‍रखन‍े की‍ऄनुमजत‍ूजगी। iii. बैंक्वेट‍ूॉल‍के‍मामले‍म,ें - तल‍अारण‍के‍ऄंतगव त‍अन‍े ााले‍बेुमेंट‍में‍पार्ककग‍की‍ऄनुमजत‍ूजगी।‍पार्ककग‍के‍जलए‍जस्ट्टल्ट‍फ्लजर‍की‍ ऄनुमजत‍ू , - ुेााओं/स्ट्टजरेज‍के‍जलए‍30% बेुमेंट‍क्षेत्र‍की‍जगनती‍एफएअर‍में‍नूीं‍की‍जाएगी। iv. आंटरनेिनल‍कंाेंिन‍ुेंटर‍के‍मामले‍में,‍प्रागं ण‍प्रदान‍करन‍े के‍जलए‍ऄजधकतम‍10%‍ग्राईंड‍कारेज‍की‍ऄनुमजत‍दी‍ जाएगी। यदद,‍प्रांगण‍के‍जलए‍ऄनुमेय‍ऄजतररि ‍ग्राईंड‍कारेज‍का‍ईपयजग‍दकया‍जाता‍ू,, तज‍ईपयजग‍दकए‍गए‍ग्राईंड‍ कारेज‍का‍25%‍एफएअर‍म‍ेंजगना‍जाएगा। v. ईपयुवक्‍त‍प्‍लॉट‍के‍जलए‍एएअइ,‍ददल्‍ली‍ऄजगनश्‍मन‍ुेाा‍और‍ऄन्‍य‍ुांजाजधक‍जनकायों‍ुे‍मजं ूरी‍प्राप्‍त‍ूजन‍े पर‍कजइ‍ उाँचाइ‍प्रजतबंध‍लाग‍ूनूीं‍ूोंगे। vi. ुूायक‍(अनीु जं गक)‍आस्ट्त‍ मे ाल‍के‍जलए‍ित:ें क. ुामाजजक-ुांस्ट्कृजतक‍ुुजाधा‍(टाआप-II‍और‍टाआप-III)‍के‍मामल‍े में:‍ुूायक/अनुींजगक‍ुुजाधाओं‍की‍ स्ट्‍ाीकायव‍एफएअर‍के‍ऄजधकतम‍20%‍तक‍ऄनमजत‍दी‍जाएगी।‍ ख. ‍ऄंतरराष्र‍ीय‍‍कन्‍ाेंिन‍‍ुेंटर‍और‍ुामाजजक‍–‍ुांस्ट्‍कृजतक‍केंद्र‍के‍ऄलााा‍‍ुामाजजक-ुांस्ट्कृजतक‍ ुुजाधा‍(टाआप-IV)‍के‍मामल‍े में:‍ुूायक/अनुींजगक‍ुुजाधाओं‍की‍स्ट्‍ाीकायव‍एफएअर‍के‍ऄजधकतम‍ 50%‍तक‍ऄनमजत‍दी‍जाएगी। ग. ऄंतरराष्र‍ीय‍‍कंन्‍ाेंिन‍‍ुेंटर‍के‍मामले‍में:‍प्रदिनव ी‍स्ट्‍थल,‍‍कन्‍ािें न‍और‍ब,ठक‍स्ट्थ‍ ल‍स्ट्‍ाीकायव‍एफएअर‍ का‍न्‍यनू तम‍40%‍ूजगा।‍ुूायक‍अनीु ंजगक‍ुुजाधाओं‍(फुटकर‍दकु ान,‍कायावलय‍स्ट्‍थल/व्य‍ ााुाजयक‍‍ कायावलय,‍ूजटल‍और‍ुंबंजधत‍गजतजाजधयां)‍की‍स्ट्‍ाीकायव‍एफएअर‍के‍ऄजधकतम‍60%‍तक‍ऄनमजत‍दी‍ जाएगी। घ. ‍ुामाजजक-ुांस्ट्‍कृजतक‍केंद्र‍के‍मामले‍में:‍ुामाजजक‍ुांस्ट्‍कृजतक‍गजतजाजधयां‍स्ट्‍ाीकायव‍‍एफएअर‍के‍ न्‍यनू तम‍ 40%‍ ूजगी।‍ ुूायक‍ अनुींजगक‍ ुुजाधाओं‍ (फुटकर‍ दकु ान,‍ कायावलय‍ स्ट्‍थल/व्य‍ ााुाजयक‍‍ कायावलय,‍ूजटल‍और‍ुंबंजधत‍गजतजाजधयां)‍की‍स्ट्‍ाीकायव‍एफएअर‍के‍ऄजधकतम‍60%‍तक‍ऄनमजत‍दी‍ जाएगी। 22.15.8‍ऄन्य-ुमदु ाजयक‍ुजु ाधाएं‍ क. ईपयजग‍पररुर‍एा‍ंपररभाीाए ाँ ताजलका‍22.75‍ईपयजग‍पररुर‍एा‍ंपररभाीा - ऄन्य-ुामदु ाजयक‍ुजु ाधाए ं क्र.ु.ं ईपयजग‍पररुर पररभाीा 1 र,न‍बुेरा जबना‍दकुी‍िुल्क‍या‍टजकन‍िुल्क‍के‍ुाथ‍्जि यों‍कज‍राजत्र‍अााु‍ प्रदान‍ करन‍े की‍ ुुजाधा‍ ााले‍ पररुर।‍ यू‍ स्ट्थानीय‍ ुरकार‍ या‍ स्ट्ा,जच्छक‍एजेंजुयों‍द्वारा‍ुंचाजलत‍ूज‍ुकते‍ू।ैं 2 ऄन्‍य‍ुामुदाजयक‍ुुजाधा‍(टाआप-I) पररुर,‍जूां‍बुएजाध‍छजटे‍पम, ाने‍की‍ुामुदाजयक‍धार्नमक‍ुुजाधाएं‍ ूजगी।‍(ऄथावत्‍छजटे‍स्ट्त‍ र‍पर‍धार्नमक‍ुुजाधा‍अदद)‍‍ 3 ऄन्‍य‍ुामुदाजयक‍ुुजाधा‍(टाआप-II)‍ पररुर‍ में‍ बुजुगों/जाकलांग‍्जि यों/ मानजुक‍ रूप‍ ुे‍ जाकलांग,‍ मजूलाओं‍और‍बच्‍चों‍की‍देखभाल‍और प्रजिक्षण‍और‍भजजन‍तथा‍268 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] अााु‍ की‍ ुुजाधा‍ ू।, ‍ आुमें‍ कामकाजी‍ मजूला/पुरूीज‍ के‍ जलए‍ अााुीय‍ुुजाधाएं‍और‍व्‍यस्ट्‍कों‍के‍जलए‍जिक्षा/प्रजिक्षण‍ुुजाधाएं‍भी‍ िाजमल‍ू।, ‍(ऄथावत्‍ाृद्ध‍अश्रम,‍ददव्‍यांग‍व्‍यजि यों/‍मानजुक‍रूप‍ु‍े जाकलांग‍व्‍यजि यों‍के‍जलए‍देख‍रेख‍केंद्र,‍कायवरत‍मजूलाओं-पुरूी‍के‍ ूजस्ट्‍टाल,‍प्रौढ़‍जिक्षा‍केंद्र‍अदद)‍ 4 ऄन्‍य‍ुामुदाजयक‍ुुजाधा‍(टाआप-III)‍ कानून‍ुे‍जुड़‍रू‍े ऄथाा‍ऄपराध‍करन‍े ााले‍बच्‍चों‍के‍ुुधार,‍परामि‍व और‍अााु‍के‍जलए‍ुुजाधाओं‍ुजूत‍पररुर/अचरण‍ुुधार‍के‍जलए‍ ुंबंजधत‍न्‍याजयक‍ुुजाधाएं‍और‍ुेााएं‍भी‍यूा‍ं जस्ट्थत‍ूजगी।‍‍(ऄथातव ‍् ुुधारक/ऄालजकन‍गृू/जािेी‍गृू/बाल‍गृू)‍ 5 ऄन्‍य‍ुामुदाजयक‍ुुजाधा‍(टाआप-IV) ज्य‍ ादा‍अााजाूी‍ुजूत‍बड़ी‍धार्नमक‍ुुजाधाओं‍के‍जलए‍पररुर।‍ (ऄथातव ्‍बड़ी‍धार्नमक‍ुुजाधा)‍ ख. ऄनमु ये ‍गजतजाजधया ं ताजलका‍22.76‍ईपयजग‍पररुर‍एा‍ंऄनमु त‍गजतजाजधया‍ं- ऄन्य-ुामदु ाजयक‍ुजु ाधाए ं क्रम‍ ईपयजग‍जजन‍ अर‍डी‍ पीएु‍ 1 ुं. पररुर‍का‍ईपयजग‍ राजत्र‍ ऄन्‍य‍ ऄन्‍य‍ ऄन्‍य‍ ऄन्‍य‍ जाश्राम‍ ुामुदाजयक‍ ुामुदाजयक‍ ुामुदाजयक‍ ुामुदाजयक‍ गृू‍ ुुजाधा‍ ुुजाधा‍ ुुजाधा‍ ुुजाधा‍ (टाआप-I) (टाआप-I) (टाआप-III) (टाआप--IV) ऄनुमत‍गजतजाजधयां‍ 1 2 3 4 5 1 स्ट्‍टाफ‍के‍जलए‍अााु‍ 2 ूजस्ट्‍टल‍ 3 खुदरा‍दकु ान‍ (20 ागव‍मी.‍तक) 4 बैंक‍एक्‍ुटेंिन‍काईंटर‍ 5 प्रचारकों,‍भक्त‍ ों/प्रबंधन‍स्ट्‍टाफ‍के‍जलए‍ अााु‍(कुल‍एफएअर‍का‍ऄजधकतम‍15%)‍ 6 लंगर‍ूॉल/दकचन‍ 7 प्राथवना‍ूॉल‍  8 अडीटजररयम‍ 9 ुंग्राूलय‍ 10 म्‍यजू जयम/अट‍वग,लरी/ प्रदिवनी‍ुेंटर‍ 11 यजग‍के‍जलए‍प्रजिक्षण‍केंद्र‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 269 12 अााुीय‍ुुजाधा‍के‍ुाथ‍देखरेख‍गृू‍ 13 स्ट्‍ाास्ट्‍्‍य‍ुुजाधाएं/जजम 14 डाआलनग‍ुुजाधा‍ 15 कल्‍याण‍केंद्र‍ 16 राजत्र‍जाश्राम‍गृू‍और‍ुंबंजधत‍ुुजाधाएं‍ 17 मंददर,‍मजस्ट्जद,‍चच,व‍गरूु द्वारा,‍यहूदी‍ ुभाघर‍(प्राथवना‍भान),‍अश्रम‍‍ 18 स्ट्‍नान‍घाट‍ 19 गौिाला 20 दरगाू 21 च,ररटेबल‍स्ट्‍ाास्ट्‍्‍य‍ुुजाधा‍ 28 कैंटीन‍ 29 रेस्ट्‍टजरेंट‍ 30 जनगरानी‍अााु‍ (20 ागव‍मी.‍‍तक‍). 32 एटीएम 33 प्रिाुन‍कायावलय‍के‍जलए‍स्ट्थ‍ ान‍ 34 ्‍यान/अ्‍याजत्मक‍प्रजिक्षण‍के‍जलए‍ुुजाधाए‍ 35 म्‍यजू जक‍और‍कला‍के‍ऄन्‍य‍रूप‍में‍प्रजिक्षण‍ ूते ु‍ुुजाधाएं/स्ट्‍टूजडयज‍270 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ग. जाकाु‍जनयत्रं ण‍मानदडं ‍ ताजलका‍22.77‍ऄन्य-ुामदु ाजयक‍ुजु ाधाए ं न्यनू तम‍ न्यनू तम‍भखू डं ‍ ऄजधकतम‍ एफएअ मागाजव ध उंचाइ क्र.ु.ं ईपयजग‍पररुर‍ ुख्ं या क्षत्रे ‍(ाग‍वमी.)/‍ ग्राईंड‍ र कार‍ (मी.) यजू नट कारेज (%) (मी.) स्ट्थानीय‍स्ट्तर जनुंख्या‍10000‍तक उाँचाइ‍कजइ‍ प्रजतबंध‍नूीं, भारतीय‍ जामानपिन‍ प्राजधकरण, ऄन्‍य‍ुामुदाजयक‍ ददल्ली‍ऄजग्न‍ 1 2 400 40 100 12 ुुजाधा‍(टाआप-I) िमन‍ुेाा,‍ डीएमए,‍ एनएमए‍और‍ ऄन्य‍ुांजाजधक‍ जनकायों‍की‍ मंजूरी‍के ऄ्यधीन।‍ ुामदु ाजयक‍स्ट्त‍ र‍ जनुंख्या‍100000‍तक र,न‍ाुेरा*‍ 26‍मी. 1 1 100 60 200 ईप-िूरी‍स्ट्तर जनुंख्या‍5000000‍तक‍ उाँचाइ‍कजइ‍ प्रजतबंध‍नूीं, भारतीय‍ जामानपिन‍ प्राजधकरण, ददल्ली‍ऄजग्न‍ ‍ऄन्‍य‍ुामुदाजयक‍ 1 5 1000 40% 120 18 िमन‍ुेाा,‍ ुुजाधा‍(टाआप-II) डीएमए,‍ एनएमए‍और‍ ऄन्य‍ ुांजाजधक‍ जनकायों‍की‍ मंजूरी‍के ऄधीन।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 271 िूरी‍स्ट्तर जनुंख्या‍2000000‍तक उाँचाइ‍कजइ‍ प्रजतबंध‍नूीं, भारतीय‍ अाश्‍य ऄन्‍य‍ुामुदाजयक‍ जामानपिन‍ 1 कतानु 2000 40% 150 18 ुुजाधा‍(टाआप-III) ुार‍ प्राजधकरण, ददल्ली‍ऄजग्न‍ िमन‍ुेाा,‍ डीएमए,‍ एनएमए‍और‍ ऄन्य‍ अाश्‍य ऄन्‍य‍ुामुदाजयक‍ अाश्‍यकतानुुा ुांजाजधक‍ 2 कतानु 30% 100 24 ुुजाधा‍(टाआप-IV) र जनकायों‍की‍ ुार‍ मंजूरी‍के ऄधीन। ऄन्य‍जनयत्रं ण: i. स्ट्थानीय‍जनकाय‍के‍मानदडं ों‍के‍ऄनुुार‍धजबी‍घाटों/कपड़े‍धजने‍के‍जलए‍जगू‍अााुीय‍ईपयजग‍क्षेत्र/पीएुपी‍ ुुजाधा‍क्षेत्रों‍में‍प्रदान‍की‍जाएंगी।‍ऐुी‍स्ट्‍थलों‍पर‍जनम्न‍ जलजखत‍ुुजाधाओं‍की‍ऄनुमजत‍ूजगी।‍ओारूड, ‍टैंक,‍ ऄंडरग्राईण्ड‍ ‍टैंक,‍अक्ु‍ ीडेंिन‍प ड‍ु,परटक‍टैंक,‍ुीारेज‍पंलम्पग‍स्ट्‍टेंिन,‍ुाावजजनक‍िौचालय,‍मूत्रालय,‍जाद्युत‍ ईप-केंद्र,‍डलाा‍और‍डस्ट्‍टजबन,‍धजबीघाट,‍मिीन‍लाईंड्री।‍ ii. *नाआट‍िल्े टर‍का‍स्ट्थान‍्ााूाररक‍मांग/मल्ू यांकन‍के‍अधार‍पर‍स्ट्थानीय‍ऄजधकाररयों‍/‍जीएनुीटीडी‍द्वारा‍तय‍ दकया‍जाएगा।‍नाआट‍िल्े टर‍के‍भौगजजलक‍जातरण‍के‍जलए, प्रजत‍प्रिाुजनक‍आकाइ‍ज,ु‍े राजस्ट्ा‍ुब-जडाीजन‍या‍ पुजलु‍स्ट्टेिन‍के‍ऄजधकार‍क्षेत्र‍में‍कम‍ुे‍कम‍एक‍नाआट‍िेल्टर‍बनाने‍की‍यजजना‍के‍जलए‍मानदंड‍भी‍बनाए‍ जाएंगे।‍नए‍प्रस्ट्‍ताजात‍जनमावणों‍में, भूतल‍पर‍व्‍यााुाजयक‍स्ट्‍थान‍और‍पूली‍मंजजल‍पर‍र,न‍बुेरे‍के‍ुाथ‍एकीकृत‍ पररुर‍ज,ुी‍नाीन‍ऄाधारणाओं‍कज‍ऄपनाकर; और‍मौजूदा‍भानों‍में‍ईपयुक्‍त‍ुंिजधनों‍के‍ुाथ‍र,न‍बुेरा‍ बनाने‍की‍ऄनुमजत‍ूोंगी।‍रेलाे, स्ट्ाास्ट््य, ईद्यजग, डीटीुी, पुजलु, अदद‍ज,ुी‍ुंबंजधत‍एजेंजुयों‍द्वारा,जूां‍ व्‍याूायव‍ूज,‍रेलाे‍के‍टर्नमनलों, बु‍टर्नमनलों, थजक/खुदरा‍बाजारों, फ्रेट‍कॉम्प्लेक्ु, पुजलु‍स्ट्टेिनों‍अदद‍में‍नाआट‍ िेल्टर‍बनाए‍जा ुकते‍ू।ैं iii. **कामकाजी‍पुरुी-मजूला‍छात्राााु‍स्ट्थानों‍का‍जनधावरण‍कायव/रजजगार‍केंद्रों‍की‍जनकटता‍और‍मांग‍के‍अकलन‍ के‍अधार‍पर‍दकया‍जाएगा। iv. अनीु ाजं गक‍ईपयजग‍के‍जलए‍ित:ें‍ क. ऄन्‍य‍ुामुदाजयक‍ुुजाधा‍(टाआप-I)‍के‍मामल‍े में‍ुूायक/अनुींजगक‍ुुजाधाएं‍ऄजधकतम‍50‍ाग‍व मी.‍ तक‍ऄनुमेय‍ूोंगी।‍ ख. ऄन्‍य‍ुामुदाजयक‍ुुजाधा‍(टाआप-II‍और‍III)‍के‍मामल‍े में‍ुूायक/अनीु ांजगक‍ुुजाधाएं‍ऄजधकतम‍20%‍ ऄनुमेय‍एफएअर‍तक‍ऄनुमत‍ूोंगी।‍ ग. ऄन्‍य‍ुामुदाजयक‍ुुजाधाएं‍(टाआप-IV)‍के‍मामल‍े म‍ें ुूायक/अनीु ांजगक‍ुुजाधाए‍ं ऄजधकतम‍5%‍ ऄनुमेय‍एफएअर‍तक‍ऄनुमत‍ूोंगी।‍‍272 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 22.15.9‍श्मिान‍भजू म,‍कजब्रस्ट्तान और‍जुमरे ी‍ क. ईपयजग‍पररुर‍एा‍ंपररभाीाए ाँ ताजलका 22.78 ईपयजग‍पररुर‍एा‍ंपररभाीा – श्मिान‍भजू म, कजब्रस्ट्तान‍और‍जुमरे ी क्र.ु.ं ईपयजग‍पररुर पररभाीा 1 कजब्रस्ट्तान‍ पररुर‍म‍ेंिाों‍कज‍दफनान‍ेकी‍ुुजाधा‍ू।, 2 श्मिान‍भूजम‍ पररुर‍म‍ेंिाों‍कज‍जलाकर‍ऄंजतम‍ुंस्ट्कार‍करन‍े की‍ुुजाधा‍ू।, 3 जुमेरी पररुर‍म‍ेंिाों‍कज‍दफनान‍ेकी‍ुुजाधा‍ू।, 4 जाद्युत दाू‍गृू पररुर‍म‍ेंमृतक‍का‍ऄंजतम‍ुंस्ट्कार‍करन‍े की‍ुुजाधा‍ू।, 5 पिुओं‍के‍जलए‍दफन‍भूजम पररुर‍म‍ेंजानारों‍कज‍दफनान‍ेकी‍ुुजाधा‍ू,। ख. ऄनमु ये ‍गजतजाजधया ं ताजलका 22.79 ईपयजग‍पररुर‍एा‍ंऄनमु त‍गजतजाजधया ाँ- श्मिान‍भजू म, कजब्रस्ट्तान‍और‍जुमरे ी क्र.ु.ं ईपयजग‍जजन पीएु1 ईपयजग‍ 1 2 3 4 5 पररुर दफन‍भजू म‍ श्मिान‍भजू म कजब्रस्ट्तान जाद्यतु ‍दाू‍गूृ ‍ जानारों‍के‍ जलए‍दफन‍ भजू म ऄनमु ये ‍ गजतजाजधया ं 1. ऄनुष्ठान‍करने‍के‍जलए‍    िेड‍ 2. मौतों‍के‍पंजीकरण‍के‍     जलए‍ुुजाधाएं 3. लकड़ी, फूलों‍और‍ऄन्य‍      ुंबंजधत‍ुामग्री‍की‍ खुदरा‍दकु ान ें 4. पेय‍जल      5. पार्ककग      6. ाॉच‍एंड‍ााड‍वरेजजडेंु‍      (20 ागवमीटर)[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 273 ग. जाकाु‍जनयत्रं ण‍मानदडं ताजलका 22.80 श्मिान‍भजू म, कजब्रस्ट्तान‍और‍जुमरे ी क्र.ु.ं ईपयजग‍ ुख्ं या न्यनू तम‍ ऄजधकतम‍ एफए न्यनू तम‍ उंचाइ पररुर भखू डं ‍क्षत्रे ‍ ग्राईंड‍ अर मागाजव ध (मी.) (ाग‍वमी.) कारेज कार‍(मी.) 1 कजब्रस्ट्तान 10 लाख‍ 10000 लाग‍ूनूीं‍ लाग‍ू 18 लाग‍ूनूीं नूीं जनुंख्या‍के‍ जलए‍1‍ 2 श्मिान‍भूजम‍ ‍5 लाख‍ 5000 50% 100 18 उाँचाइ‍कजइ‍प्रजतबंध‍ नूीं, भारतीय‍ जनुंख्या‍के‍ जलए‍1 जामानपिन‍ प्राजधकरण, ददल्ली‍ ऄजग्न‍िमन‍ुेाा,‍ डीएमए,‍एनएमए‍ और‍ऄन्य‍ुांजाजधक‍ जनकायों‍की‍मंजूरी‍के‍ ऄधीन। 3 जुमेरी 10 लाख‍ 10000 लाग‍ूनूीं लाग‍ू 18 लाग‍ूनूीं नूीं जनुख्ं या‍के‍ जलए‍1 4 जाद्युत दाू‍ 5 लाख‍ 5000 50% 100 18 लाग‍ूनूीं गृू जनुंख्या‍के‍ जलए‍1 5 पिुओं‍के‍जलए‍ 10 लाख‍ 2000 लाग‍ूनूीं लाग‍ू 18 लाग‍ूनूीं दफन‍भूजम नूीं जनुंख्या‍के‍ जलए‍1 ऄन्य‍जनयत्रं ण: i) श्मिान‍घाट‍के‍मामल‍े म,ें िादाूगृू‍(बेजुक‍/‍ग्रीन‍/‍ग,ुीफायर‍अधाररत/ जबजली) के‍जलए‍ प्रााधान‍त,यार‍दकया‍जाएगा।‍मौजूदा‍श्मिान‍घाटों‍म,ें िादाूगृू‍के‍जलए‍प्रााधान‍बनाया‍जाना‍ चाजूए।274 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 22.15.10 बुए-ुजु ाधा‍प्लॉट ताजलका‍22.81 बुए‍ुजु ाधा‍भखू डं ‍के‍जलए‍जाकाु‍जनयत्रं ण‍मानदडं ईपयजग‍ भखू डं ‍ ग्राईंड‍ एफएअर मागाजव धकार‍ उंचाइ ऄनमु ये ‍गजतजाजधया ं पररुर क्षत्रे कारेज (मी.) (मी.) (ाग‍व (ऄजधकतम) (न्यूनतम) मी.) उाँचाइ‍कजइ‍प्रजतबंध‍नूीं, ‍स्ट्थ‍ ानीय‍स्ट्त‍ र‍पर‍ पीएुपी‍ुजु ाधाओं‍का‍ भारतीय‍जामानपिन‍ बुए‍ 18 प्राजधकरण, ददल्ली‍ऄजग्न‍ जमश्रण‍स्ट्ा‍ ास्ट््‍य‍ ,‍जिक्षा‍,‍ ुजु ाधा‍ 500 50% 200 ुामाजजक‍ुाुं कृजतक‍ िमन‍ुेाा,‍डीएमए,‍ भखू डं ऄन्य‍ ‍ुामदु ाजयक‍ एनएमए‍और‍ऄन्य‍ ुांजाजधक‍जनकायों‍की‍ ुजु ाधाए,ं‍ुचं ार‍ मंजूरी‍के ऄधीन। ुजु ाधाएं‍ नजटः भूखंड‍पर‍कइ‍ुुजाधा‍प्रदान‍करन‍े के‍जलए, ऄजधकतम‍2/3 बीयूए‍तक‍एकल‍फंक्िन‍करने‍की‍ऄनुमजत‍ूजगी। 22.15.11 ुााजव जनक‍और‍ऄध-व ुााजव जनक‍ुजु ाधाए‍ं/‍पररुर ये‍मानदंड‍ईन‍पीएुपी‍ुुजाधाओं‍/‍पररुरों‍के‍मामले‍म‍ें लागू‍ूोंगे, जजनके‍जलए‍जाजिष्ट‍जाकाु‍जनयंत्रण‍जनर्ददष्ट‍नूीं‍ दकए‍गए‍ू।ैं 1.‍ऄजधकतम‍ग्राईंड‍कारेज‍ 30% 2.‍ऄजधकतम‍फि‍व क्षेत्र‍का‍ऄनपु ात‍120 3.‍ऄजधकतम‍उाँचाइ‍ 26‍मी.‍ नजटः i. ुरकारी‍भूजम‍अााु,‍एजेंजुयों‍द्वारा‍राजनीजतक‍दलों‍कज‍अांरटत‍दकए‍गए‍भूखंडों‍के‍मामले‍में, ऄजधकतम‍15% तक‍एफएअर, अााुीय‍छात्राााु‍अााु‍के‍जलए‍ईपयजग‍दकया‍जा‍ुकता‍ू।, ii. ददमुयज-2021‍के‍प्रााधानों‍के‍ऄनुुार‍ऄनुमेय‍पीएुपी‍ुुजाधाओं‍के‍ुाथ‍एक‍या‍एक‍ु‍े ऄजधक‍ईपयजग‍के‍जलए‍ छजटे‍पीएुपी‍भूखंडों‍ कज‍जजड़ने‍या‍बड़े‍पीएुपी‍भूखंडों‍के‍ईप‍जाभाजन‍की‍ऄनुमजत‍दी‍जाती‍ू।, 22.16‍ईपयजग‍जजन‍म‍ेंईपयजग‍पररुरों‍की‍ऄनमु जत‍ लेअईट‍यजजना‍के‍ऄनुमजदन‍या‍प्राजधकरण‍ुे‍प्राप्त‍जािेी‍ऄनुमजत‍के‍मामले‍में, ईपयजग‍जजन‍अरडी, ुी1, ुी2, एम, पीएु‍में‍चयजनत‍ईपयजग‍पररुर‍की‍ऄनुमजत‍जनम्नजलजखत‍के‍ऄनुुार‍ू:, ताजलका‍22.82‍ईपयजग‍जजन‍म‍ेंईपयजग‍पररुरों‍की‍ऄनमु जत ईपयजग‍जजन क्र.ु.ं ईपयजग‍पररुर अरडी ुी ुी एम पीएु‍ 1 2 अरडी अााुीय i. अााुीय‍भूखंड‍–‍प्लॉरटड‍ूाईलुग पी पी** एनपी एनपी एनपी ii. अााुीय‍भूखंड‍–‍ग्रुप‍ूाईलुग‍ पी पी एनपी पी पी[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 275 iii. स्ट्टूजडयज‍ऄपाटवमेंट पी एनपी एनपी एनपी एनपी iv. जनााु‍-‍ुू‍-‍कायव‍प्लॉट पी पी एनपी एनपी एनपी v. जादेिी‍जमिन पी पी एनपी एनपी एनपी vi. छात्राााु‍/‍ाृद्धाश्रम पी पी एनपी पी पी vii. ऄल्पााजध‍अााु‍-‍छात्राााु‍/‍ऄजतजथ‍गृू‍/‍ पी पी पी पी पी लॉलजग‍और‍बजर्मडग‍ूाईु‍/‍ुराय‍/‍कामकाजी‍ मजूला-पुरुी‍ छात्राााु, धमिव ाला‍ और‍ आुके‍ ुमान‍/‍ुेाा‍ऄपाटवमेंट बुएईद्देिीय‍ुामुदाजयक‍ूॉल‍/‍बारात‍घर पी पी एनपी पी पी viii. ix. र,न‍बुेरा पी पी पी पी पी x. ुामुदाजयक‍ /‍ मनजरंजन‍ ूॉल, पुस्ट्तकालय, पी पी पी पी पी ााचनालय, ुजुायटी‍कायावलय, क्रेच‍और‍ड‍े केयर‍ ुेंटर। xi. राज्य‍भान‍/‍राज्य‍ऄजतजथ‍गृू पी पी पी पी पी ग ्ााुाजयक i. स्ट्थानीय‍स्ट्तर‍(ुुजाधा‍/‍स्ट्थानीय‍िॉलपग‍ुेंटर) पी पी पी पी पी ii. जुनेमा‍/‍मल्टीप्लेक्ु एनपी पी पी पी* एनपी iii. ुेाा‍बाजार‍/‍ऄनौपचाररक‍बाजार पी पी पी पी एनपी iv. थजक‍्ापार एनपी पी पी एनपी एनपी v. भंडार, गजदाम‍और‍भडं ारण, कजल्ड‍स्ट्टजरेज‍और‍ एनपी एनपी पी पी एनपी बफव‍कारखाने, ग,ु‍गजदाम। vi. पी पी पी पी पी गेस्ट्ट‍ूाईु‍/‍लॉलजग‍और‍बजर्मडग‍ूाईु vii. एनपी पी पी पी पी ुर्नाु‍ऄपाटवमेंट viii. एनपी पी पी पी एनपी ूजटल‍ पी मनजरंजनत्म‍ क‍ i. मनजरंजनत्म‍ क‍(पाकव, प्ले‍ग्राईंड, जस्ट्ालमग‍पलू )‍/‍ पी पी पी पी पी स्ट्पजट्ुव‍कॉम्प्लेक्ु‍/‍स्ट्टेजडयम‍/‍एम्यूज़मेंट‍पाकव‍/‍ मनजरंजन‍क्लब‍अदद। एम ईद्यजग i. औद्यजजगक‍भूखंड,‍फ्ल,टेड‍ुमूू‍ईद्यजग एनपी एनपी एनपी पी एनपी ii. ुेाा‍केंद्र‍और‍ुेाा‍ईद्यजग एनपी पी पी पी एनपी टी परराून i. पररुंचरण‍ (ुड़क‍ फनीचर, बु‍ टर्नमनल, पी पी पी पी पी एमअरटीएु‍स्ट्टेिन, पार्ककग‍अदद‍के‍ुाथ‍ुड़क‍ नेटाकव) ii. बु‍जडपज‍और‍ाकविॉप एनपी एनपी एनपी पी एनपी276 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] iii. जनजी‍ुाधनों‍के‍जलए‍बुए-स्ट्तरीय‍पार्ककग एनपी पी पी पी पी जी ुरकार i. स्ट्थानीय‍/‍ुरकारी‍रखरखाा‍कायावलय पी पी पी पी पी ii. ईपयजजगता‍ुेााएं‍प्रदान‍करन‍े ााली‍एजेंजुयों‍के‍ पी पी पी पी पी कायावलय iii. ुरकारी‍ कायावलय‍ (केंद्रीय‍ /‍ राज्य‍ ुरकार‍ /‍ एनपी पी पी पी पी स्ट्थानीय‍जनकाय), एकीकृत‍कायावलय‍पररुर iv. जजला‍न्यायालय‍/‍परराार‍न्यायालय एनपी पी पी पी पी पीएु1 ुााजव जनक‍और‍ऄध‍वुााजव जनक‍ुजु ाधाए ं स्ट्ाास्ट््य i. ऄस्ट्पताल‍(0.2‍ूक्े टेयर‍ुे‍1.5‍ूक्े टेयर) पी पी एनपी पी पी ii. तृतीयक‍स्ट्ाास्ट््य‍देखभाल‍केंद्र पी पी एनपी पी पी iii. प्राथजमक‍स्ट्ाास्ट््य‍केंद्र‍/‍परराार‍कल्याण‍केंद्र‍/‍ पी पी एनपी पी पी मातृत्ा‍गृू‍/‍औीधालय‍अदद, जििु‍जचदकत्ुा‍केंद्र‍ /‍ जराजचदकत्ुा‍ केंद्र, स्ट्ा,जच्छक‍ स्ट्ाास्ट््य‍ ुेााए,ं जास्ट्ताररत‍ स्ट्ाास्ट््य‍ देखभाल‍ ुुजाधाएं‍ (ज,ुे‍ ुंक्रमण-घर, िुन‍ देखभाल‍ केंद्र, प,थजलॉजी‍ प्रयजगिाला, छजटे‍स्ट्ाास्ट््य‍केंद्र), निामुजि ‍केंद्र iv. नर्मुग‍ूजम‍/‍पॉली‍जक्लजनक‍/‍जक्लजनक‍/‍न,दाजनक‍ पी पी एनपी पी* पी प्रयजगिाला‍अदद।‍ v. पिुओं‍और‍जानारों‍के‍जलए‍औीधालय पी पी पी पी पी जिक्षा i. प्राथजमक‍जाद्यालय‍/‍मा्यजमक‍जाद्यालय, पूाव- पी एनपी एनपी एनपी पी प्राथजमक‍/‍नुवरी‍/‍मोंटेुरी‍स्ट्कूल, ii. क्रेच‍और‍डे‍केयर‍ुेंटर, अंगनााड़ी, प्ले‍स्ट्कूल पी पी पी पी पी iii. ुीजनयर‍ुेकेंडरी‍स्ट्कूल पी एनपी एनपी एनपी पी iv. मानजुक‍रूप‍ुे‍जाक्लांग‍/‍जनःिि जन‍्जि यों‍ पी एनपी एनपी एनपी पी के‍जलए‍स्ट्कूल v. तकनीकी‍प्रजिक्षण‍केंद्र‍(अइटीअइ‍/‍पॉजलटेदक्नक‍/‍ पी पी एनपी पी पी ्ााुाजयक‍/‍प्रजिक्षण‍ुंस्ट्थान‍/‍प्रबंधन‍ुंस्ट्थान‍/‍ जिक्षक‍प्रजिक्षण‍ुंस्ट्थान, अदद), कौिल‍केंद्र vi. ऄनुुंधान‍और‍जाकाु‍केंद्र‍ एनपी पी एनपी पी पी ुजु ाधाए ाँ i. बु‍टर्नमनल, ट,क्ुी‍स्ट्टैंड, दधू ‍/‍ुब्जी‍बूथ, धार्नमक‍ पी पी पी पी पी पररुर, ाेंलडग‍बथू , पेरजल‍/‍ुीएनजी दफललग‍पंप, मनजरंजक‍ क्लब, पुजलु‍ चौकी, पुजलु‍ पजस्ट्ट,‍ पुजलु‍स्ट्टेिन, फायर‍पजस्ट्ट, फायर‍स्ट्टेिन, पजस्ट्ट‍ ऑदफु‍ और‍ टेलीग्राफ‍ कायालव य‍ और‍ टेलीफजन‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 277 एक्ुचेंज। ii. जनःिि जन‍और‍मानजुक‍रूप‍ुे‍जाकलांग‍के‍जलए‍ देखभाल‍केंद्र, ऄनाथालय‍/‍बच्चों‍के‍केंद्र, ाररष्ठ‍ पी एनपी एनपी पी पी नागररकों‍के‍क्लब।‍ पीः ऄनुमजत पी*: केाल‍्ााुाजयक‍केंद्रों‍में‍ऄनुमजत‍ एनपीः ऄनुमजत‍नूीं पी**:‍जमजश्रत‍ईपयजग‍/‍जािेी‍क्षत्रे ‍जाजनयमों‍के‍ऄनुुार‍जािीे ‍ऄनुमजत नजटः 1. ुभी‍ईपयजग‍क्षेत्रों‍म‍ेंपाकव, ओपन‍पार्ककग, ुकुवलेिन‍और‍ुाावजजनक‍ईपयजजगताओं / ुुजाधा‍की‍ऄनुमजत‍। 2. आन‍ईपयजग‍जजनों‍म‍ेंईपयजग‍पररुर‍की‍ऄनुमजत‍ईपयजग‍क्षेत्र‍में‍जाजिष्ट‍कायव‍द्वारा‍जनयंजत्रत‍की‍जाएगी। क. ुी3- ूजटल, ख. पी3- ऐजतूाजुक‍स्ट्मारक, ग. टी1- एयरपजटव,‍ घ. टी2-‍टर्नमनल‍/‍जडपज‍-‍रेल‍/‍एमअरटीएु‍/‍बु‍/‍रक, ङ. टी3-‍पररचालन‍-‍रेल‍/‍एमअरटीएु‍/‍ुड़क, च. यू1-‍जल,‍यू2-ुीारेज,‍यू3-जबजली, यू4-ठजु‍ऄपजिष्ट, यू5-नाली, छ. जी1-‍ राष्ट्रपजत‍ुंपदा‍और‍ुंुद‍भान, ज. जी3-ुरकारी‍भूजम‍(ऄजनधावररत‍ईपयजग), झ. पीएु-श्मिान‍और‍दफन‍भूजम, धार्नमक, ञ. ूररत‍जाकाु‍क्षेत्र ट. डब्ल्यू2‍–‍नदी‍और‍नदी‍बाढ़‍के‍म,दान। 22.17‍ऄन्य‍जाकाु‍कजड‍ प्रत्येक‍ईपयजग‍पररुर‍के‍जलए, जनम्नजलजखत‍डीुीएन‍लागू‍ूोंगे।‍जूां‍भी,‍आु‍यजजना‍ऄथाा‍आु‍भाग‍म‍ें डीुीएन‍का‍ ईल्लेख‍नूीं‍दकया‍गया‍ू,, राष्ट्रीय‍भान‍ुंजूता‍कज‍ुंदर्नभत‍दकया‍जाएगा। 22.15.1 ूाइ‍राआज‍जबलल्डग i. ुभी‍ईपयजग‍जजनों‍में‍15‍मीटर‍(जबना‍जस्ट्टल्ट)‍और‍17.5‍मीटर‍(जस्ट्टल्ट‍ुजूत)‍ुे‍ऄजधक‍उंचे‍भानों‍ कज‍उंचे‍भान‍माना‍जाएगा। ii. जस्ट्टल्ट‍फ्लजर‍में‍स्ट्ट,क-पार्ककग‍के‍प्रााधान‍के‍मामले‍म,ें जस्ट्टल्ट‍फ्लजर‍के‍जलए‍न्यूनतम‍2.4‍मीटर‍उंचाइ‍ में‍ढील‍दी‍जा‍ुकती‍ू।, ‍ूालादं क, स्ट्ट,क‍पार्ककग‍के‍मामल‍े म,ें‍उंचाइ‍जडजाआन‍और‍ुंरचनात्मक‍ुुरक्षा‍ अाश्यकता‍के‍ऄनुुार‍ूजगी।278 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] iii. ुंबंजधत‍एजेंजुयों‍के‍पूा‍व ऄनुमजदन‍ु‍े भान‍के‍रखरखाा‍के‍जलए‍अाश्यक‍ईपकरणों‍और‍ुेााओं‍की‍ ुंस्ट्थापना‍के‍जलए‍ुजाराम‍ुर्नाु‍फ्लजर‍की‍ऄनुमजत‍दी‍जाएगी‍और‍आुे‍एफएअर‍में‍नूीं‍जगना‍जाना‍ चाजूए।‍ुंरचनागत‍ढााँचों‍की‍गूराइ,‍जल‍भडं ार,‍ऄन्‍य‍ईपकरण‍अदद‍ईपलब्ध‍ ‍कराने‍के‍जलए‍उंचाइ‍ की‍अाश्‍यकता‍के‍अधार‍पर‍ुर्नाु‍फ्लजर‍की‍उंचाइ‍का‍जनणवय‍दकया‍जाएगा‍।‍दकुी‍भी‍बीम‍के‍ जनचल‍े तल‍ुे‍जनचली‍उंचाइ,‍फाल्‍ु‍फ्लजर‍कज‍छजड़कर,‍यदद‍कजइ‍ूज,‍पक्क‍े‍फि‍व स्ट्‍तर‍ुे‍1.8‍मीटर‍ु‍े ऄजधक‍नूीं‍ूजनी‍चाजूए। iv. स्ट्थानीय‍जनकायों‍/‍जाभागों,‍ुंबंजधत‍नगर‍जनगम‍और‍ऄजग्निमन‍जाभाग‍ुे‍मंजूरी‍के‍ऄधीन‍ुेटब,क‍ ुीमा‍रेखाओं‍के‍भीतर‍बेुमेंट‍की‍ऄनुमजत‍दी‍जाएगी।‍जूा‍ं कजइ‍ुेटब,क‍नूीं‍ू,ैं बेुमेंट‍की‍2‍मीटर‍ तक‍की‍ऄनुमजत‍जाएगी‍और‍जूां‍ुेटब,क‍ू,, यू‍भूखण्‍ड‍की‍चारदीाार‍ुे‍6‍मीटर‍की‍दरू ी‍पर‍ूजना‍ चाजूए। v. ऄजग्निमन‍जाभाग‍ुे‍स्ट्‍ाीकृजत‍के‍ऄधीन‍ु,टब,क‍ुीमा‍रेखाओं‍के‍भीतर‍पजजडयम(यों)‍‍की‍ऄनुमजत‍दी‍ जाएगी।‍आु‍पजजडयम‍के‍भीतर‍ााूनों‍की‍अााजाूी‍और‍पार्ककग‍प्रजतबंजधत‍ूजगी।‍जस्ट्ालमग‍पूल, भूदश्ृ ‍य, और‍ुंबंजधत‍ुरं चनाओं‍ज,ुे‍ईपयजगों‍के‍जलए‍रूपटॉप‍की‍ऄनुमजत‍ूजगी। vi. खंड‍22.16.3‍के‍ऄनुुार‍तूखाने‍के‍जलए‍ऄन्य‍ितें‍ूोंगी। 22.15.2 ुटे बक, ः यजजना‍में‍जनधावररत‍अााुीय‍प्‍लॉटेड‍और‍जाजिष्ट‍‍जनधावररत‍क्षेत्रों‍के‍ऄजतररक्त‍ ‍ुभी‍प्रकार‍के‍जाकाु‍के‍जलए‍ ताजलका‍22.81‍के‍ऄनुुार‍न्यनू तम‍ु,टबेक‍ईपलब्‍ध‍कराया‍जाएगा। ताजलका 22.83 न्यनू तम‍ुटे बक, ‍(अााुीय‍प्ल‍ ॉटेड‍जाकाु‍के‍ऄलााा) प्लॉट‍का‍अकार‍(ागमव ीटर‍म)ें न्यनू तम‍ुटे बक, ुामन‍े(मी.) पीछे‍(मी.) ुाआड‍(मी.) (1) ुाआड‍(मी.) (2) 60‍तक 0 0 0 0 60‍ु‍ेऄजधक‍‍150‍तक 3 1.5 (औुत) - - 150‍ु‍ेऄजधक‍300‍तक 4 2 (औुत) - - 300‍ु‍ेऄजधक 500‍तक‍ 4 3 3 - 500‍ु‍ेऄजधक 2,000‍तक 6 3 3 3 2,000‍ु‍ेऄजधक‍10,000 तक 9 6 6 6 10,000 ु‍ेऄजधक 15 12 12 12 नजटः i. यदद‍ईपयुवि ‍ददए‍गए‍ु,टबेक‍ुे‍स्ट्ाीकायव‍कारेज‍प्राप्त‍नूीं‍ूजता‍ू,, तज‍पूावाती‍श्रणे ी‍के‍ु,टबेक‍की‍ऄनुमजत‍दी‍ जाएगी। ii. ये‍ु,टबेक,‍भान‍ईपजनयमों‍के‍ऄनुुार‍उंचाइ‍और‍ाातायन‍की‍अाश्यकताओं‍के‍ऄधीन‍ू।ैं iii. यदद‍कजइ‍लअे ईट,‍न्यूनतम‍जनधावररत‍ुेटब,क‍ु‍े ऄजधक‍के‍ुाथ‍स्ट्ाीकृत‍दकया‍जाता‍ू,, तज‍भान‍यजजनाओं‍की‍ मंजूरी‍में‍आनका‍पालन‍दकया‍जाएगा। iv. दद.जा.प्रा.‍की‍तकनीकी‍ुजमजत‍जािेी‍पररजस्ट्थजतयों‍म‍ेंु,टबेक,‍भूजम‍कारेज‍और‍उंचाइ‍म‍ेंढील‍द‍ेुकती‍ू।, v. जूां‍भी‍भूखंड‍के‍भीतर‍इएुएु‍प्रदान‍करन‍े की‍अाश्यकता‍ूजगी, ुाआड/ररयर‍ुेटब,क‍कज‍स्ट्‍थानांतररत‍कर‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 279 आुकी‍व्‍याास्ट्‍था‍करन‍े की‍ऄनमु जत‍ूजगी। 22.15.3 बुे मटें ः i. ुंबंजधत‍एजेंजुयों‍के‍पूाव‍ऄनमु जदन‍ुे,‍पार्ककग‍और‍अाश्‍यक‍ुुजाधाओं,‍ज,ुे‍एयर‍कंडीिलनग‍प्लांट‍और‍ ईपकरण, जल‍भंडारण, बॉयलर, आलेजक्रक‍ुब-स्ट्टेिन‍एचटी‍और‍एलटी प,नल‍कक्ष,‍रांुफामवर‍कम्पाटवमेंट, जनयंत्रण‍कक्ष,‍पंप‍ूाईु, जनरेटर‍कक्ष‍और‍ऄन्य‍यांजत्रक‍ुेााओं‍और‍जबजली‍और‍ऄजग्निमन‍ईपकरणों‍की‍ स्ट्थापना, और‍भान‍के‍रखरखाा‍के‍जलए‍ऄपेजक्षत‍ऄन्य‍ुेााओं‍के‍ुाथ‍ऄजधकतम‍ुमकक्ष‍ु,टब,क‍लाइन‍ तक‍बेुमेंट‍की‍ऄनुमजत‍दी‍जा‍ुकती‍ू‍,और‍एफएअर‍में‍आुकी‍गणना‍नूीं‍की‍जाएगी। ii. अााुीय‍ईपयजग‍के‍मामले‍में, बेुमेंट‍कज‍एफएअर‍में‍नूीं‍जगना‍जाएगा‍यदद‍आु‍े घरेलू‍भडं ारण‍और‍ पार्ककग‍के‍जलए‍ईपयजग‍दकया‍जाता‍ू।, ‍बेुमेंट‍की‍गणना‍एफएअर‍में‍की‍जाएगी‍यदद‍यू‍ऄनुमेय‍जमजश्रत- ईपयजग‍गजतजाजधयों‍के‍जलए‍ईपयजग‍दकया‍जाता‍ू।, ‍यदद‍बेुमेंट‍के‍ऐुे‍ईपयजग‍ुे‍भूखण्‍ड‍पर‍ऄनुमये ‍ एफएअर‍ऄजधक‍ूज‍जाता‍ू,, तज‍ुरकार‍के‍ऄनुमजदन‍ुे‍ऄजतररि ‍एफएअर‍पर‍जनधावररत‍ईपयुक्‍त‍िल्ु क‍ ाुूला‍जाएगा। iii. ूजटलों‍ के‍ मामले‍ म,ें लौंड्री,‍ खाद्य‍ ास्ट्‍तओंु ‍ के‍ भंडारण‍ के‍ जलए‍ िीतकक्ष,‍ जलनन‍ भडं ार,‍ कचराघर,‍ ूाईुकीलपग‍स्ट्टजर‍और‍िीत‍भडं ारण‍के‍जलए‍बेुमेंट‍के‍ईपयजग‍की‍ऄनुमजत‍दी‍जाएगी। iv. ूल्े थकेयर‍ुुजाधाओं‍के‍मामले‍में, ुंबंजधत‍एजेंजुयों‍के‍पूाव‍ऄनुमजदन‍ुे‍पार्ककग;‍अाश्‍यक‍ुाे ाओं‍ज,ुे‍एयर‍ कंडीिलनग‍प्लांट‍और‍ईपकरण, पानी‍का‍भंडारण, बॉयलर, आलेजक्रक‍ुब-स्ट्टेिन, एचटी‍एंड‍एलटी‍प,नल‍ कक्ष, रांुफामवर‍कम्पाटवमेंट, जनयंत्रण‍कक्ष,‍पंप‍ूाईु, जनरेटर‍कक्ष;‍स्ट्टाफ‍लॉकर‍कक्ष, स्ट्टाफ‍चेंलजग‍रूम, रुजइघर‍की‍ुुजाधा‍के‍जबना‍स्ट्टाफ‍डाआलनग‍ुुजाधाओं, ुेंरल‍स्ट्टेराआल‍अपूर्नत‍जाभाग, ब,क‍एंड‍ऑदफु; ऄन्य‍यांजत्रक‍ुेााओं; जाद्युत‍और‍ऄजग्निमन‍ईपकरणों‍की‍स्ट्थापना; और‍ऄन्य‍ुेााओं‍जु, े‍दक‍रुजइघर, लौंड्री‍और‍रेजडयजलॉजी‍ल,ब‍और‍भान‍के‍रखरखाा‍/‍ुचं ालन‍करन‍े के‍जलए‍अाश्यक‍ऄन्य‍अाश्यक‍ ुेााओं‍के‍ईपयजग‍के‍बाद‍बेुमेंट‍का‍स्ट्‍ाास्ट्‍्‍य‍ुेााओं‍के‍जलए‍ईपयजग‍दकया‍जा‍ुकता‍ू।, v. उंची‍आमारतों‍के‍मामले‍म,ें‍ुंबंजधत‍प्राजधकरणों‍ुे‍मंजरू ी‍के‍ऄधीन‍ु,टबेक‍लाआनों‍के‍भीतर‍भूखण्ड‍ ‍की‍ चारदीाारी‍ुे‍6‍मी.‍तक‍बेुमेंट‍की‍ऄनुमजत‍ूजगी। vi. भान‍की‍लाआन‍ु‍े बाूर‍बेुमेंट‍(बेुमेंटों)‍कज‍जमीन‍के‍ुाथ‍फ्लि‍रखा‍जाएगा‍और‍ाातायन‍के‍यांजत्रक‍ ुाधनों‍ुे‍ूाादार‍रखा‍जाएगा। vii. बेुमेंट‍(बेुमेंटों)‍कज‍आु‍प्रकार‍जडजाइन‍दकया‍जाएगा‍दक‍अाश्‍यकता‍पड़न‍े पर‍य‍े ऄजग्न‍िमन‍ााून‍का‍ पूरा‍भार‍ईठा‍ुकें, और‍आनमें‍पयावप्त‍ुुरक्षा‍ईपायों‍की‍व्‍यास्ट्थ‍ ा‍ूज। viii. यदद‍बेुमेंट‍ईपयजग‍पररुरों‍के‍ऄनुरूप‍गजतजाजध‍जूां‍ऄनमु त‍ूज, के‍जलए‍ईपयजग‍दकया‍जाता‍ू,, आु‍े ऄजग्निमन‍प्राजधकरणों‍और‍ऄन्य‍ुांजाजधक‍जनकायों‍ुे‍मंजूरी‍के‍ऄधीन‍एफएअर‍म‍ेंजगना‍जाएगा। ix. इएुएु, ऄजग्निमन‍ुंस्ट्थ‍ ापनाओं‍और‍भूजमगत‍पानी‍की‍टंकी‍कज‍न‍तज‍भूजम‍कारेज‍म‍ें और‍न‍ूी‍एफएअर‍ में‍जगना‍जाएगा। 22.15.4 ुर्नाु‍प्लान डेाललपग‍एजेंुी‍कज‍3000‍ागमव ीटर‍और‍ईुुे‍ऄजधक‍अकार‍के‍भूखंडों‍की‍लअे ईट‍यजजनाओं‍(प्‍लानों)‍में‍ जनम्नजलजखत‍की‍व्‍यास्ट्‍था‍करनी‍चाजूएः i. िजजधत‍ऄपजिष्ट‍‍जल‍का‍पुनचक्रण‍जजुमें‍पेयजल‍और‍पनु चक्रीत‍जल‍के‍जलए‍ऄलग-ऄलग‍लाआनें‍ूों।‍दजूरी‍ पाआलपग‍प्रणाली‍िुरू‍की‍जाए।280 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ii. ाीाव‍जल‍ुंचयन, जल‍जनकायों‍के‍ुंरक्षण‍के‍मा्यम‍ु‍े भूजल‍पुनभरव ण‍और‍भूजल‍कज‍जनकालन‍े कज‍जाजनयजमत‍ करना। iii. िजजधत‍ुीाेज‍ऄपााू‍का‍पीन‍े ुे‍आतर‍ईपयजग‍ज,ुे‍बागाानी, ााूनों‍की‍धलु ाइ, टाारों‍कज‍ठंडा‍करन,े आत्यादद‍ के‍जलए‍पुनचक्रण‍दकया‍जाना‍चाजूए। iv. भूखंड‍के‍भीतर‍भूजमगत‍जल‍भंडारण‍टैंक,‍रूफ‍टॉप‍जल‍ुग्रं ूण‍प्रणाली, ुूखे‍और‍गील‍े ऄलग-ऄलग‍डस्ट्टजबन‍ अदद‍ज,ुी‍जन‍ईपयजजगता‍ुेााओं‍की‍व्‍यास्ट्थ‍ ा‍की‍जाए। v. ुभी‍ऄस्ट्पतालों, ्ााुाजयक, औद्यजजगक, ूजटल, रेस्ट्तरा,ं ऑटज‍ाकविॉपों‍अदद‍म‍ें भूखंड‍के‍भीतर‍प्राथजमक‍ ऄपजिष्ट‍िजधन‍की‍्ास्ट्था‍करनी‍ूजगी। vi. इएुएु‍और‍जनरेटर‍की‍व्‍यास्ट्‍था‍करने‍और‍उजा‍व की‍खपत‍प्रस्ट्तुत‍करन‍े के‍जलए,‍भान‍यजजनाओं‍की‍मंजरू ी‍के‍ ुमय‍लेखा‍परीक्षा‍प्रस्ट्तुत‍की‍जाएगी। vii. भानों‍कज‍उजा‍व कुिल‍बनाने‍के‍जलए‍भान‍म‍ें खजखली‍दीाारों, प्रांगण,‍छायादार‍ईपकरणों‍के‍प्रााधानों‍कज‍ प्रजत्‍ुाजूत‍दकया‍जाएगा। viii. 300‍ागवमीटर‍और‍ईुुे‍ऄजधक‍क्षेत्रफल‍की‍छत‍ााले‍ुभी‍भूखंडों‍पर‍ुौर‍ताप‍प्रणाली‍की‍व्‍यास्ट्‍था‍की‍ जाएगी। ix. ईपरजि ‍कज‍प्रजत्ुाजूत‍करने‍के‍जलए, स्ट्थानीय‍जनकायों‍द्वारा‍दकए‍गए‍प्रााधानों‍के‍अधार‍पर‍प्रजत्ुाून‍के‍रूप‍ में‍प्रत्येक‍पर‍1% ुे‍4% ऄजतररि ‍भूजम‍कारेज‍और‍एफएअर‍ददया‍जाए।‍जािेी‍मामलों‍म‍ें 5% प्रजत्ुाून‍की‍ ऄनुमजत‍दी‍जाएगी। x. ये‍प्रजत्ुाून‍ूररत‍भानों‍के‍जलए‍‘ग्रीन‍रेरटग‍फॉर‍आंटीग्रेटेड‍ूज, बटेट‍ऄुेुमेंट’(गृू) द्वारा‍जनधावररत‍रेरटग‍ मानदंडों‍पर‍अधाररत‍ूोंगे। xi. यदद‍दखल‍प्रमाणपत्र‍प्राप्त‍करने‍के‍बाद‍ईपयुवि ‍का‍पालन‍नूीं‍दकया‍जाता,‍भू-स्ट्‍ाामी‍एजेंुी‍द्वारा‍प्रजत्ुाून‍ एफएअर‍के‍जलए‍बाजार‍दर‍पर‍जुमावना‍लगाया‍जाएगा। ईपरजि ‍के‍प्रातनव ‍के‍जलए‍जाजनयम‍पयावारण‍जाभाग, जीएनुीटीडी‍के‍परामि‍व ु‍े जनदेिक, स्ट्थानीय‍स्ट्ा- ुरकार, जीएनुीटीडी‍द्वारा‍छू‍माू‍(ुंिजधनों‍की‍ऄजधुूचना‍के‍बाद)‍के‍भीतर‍जाजनयम‍त,यार‍दकए‍जाएंग‍े और‍प्राजधकरण‍/‍केंद्र‍ुरकार‍के‍ऄनुमजदन‍ुे‍ऄजधुूजचत‍दकए‍जाएंगे। 22.15.5 ईपयजग‍पररुरों‍के‍भीतर‍भान‍जनयत्रं ण‍के‍जलए‍जाजनयम आन‍जाजनयमों‍का‍ईद्देश्य‍अंतररक‍्ास्ट्था‍कज‍छजड़कर‍ईपयजग‍पररुर‍के‍भीतर‍भान(नों)‍के‍जलए‍जनयंत्रण‍प्रदान‍ करना‍ू,, जज‍भान‍ईपजनयम‍म‍ेंकार‍दकए‍गए‍ू।ैं ुामान्य‍रटप्पजणया:ं i. जूां‍दकुी‍ईपयजग‍पररुर‍के‍जलए‍जाकाु‍जनयंत्रण‍जनधावररत‍नूीं‍ू,ैं प्राजधकरण‍द्वारा‍आनका‍जनधावरण‍ दकया‍जा‍ुकता‍ू।, ii. मेजेनाआन‍फ्लजर‍और‍ुर्नाु‍फ्लजर‍कज,‍जूां‍भी‍प्रदान‍दकए‍जाते‍ू,ैं कुल‍एफएअर‍का‍जूस्ट्ुा‍माना‍जाएगा।‍ यदद‍ुभी‍ईपयजग‍जजनों‍में‍भान‍की‍उंचाइ‍26‍मीटर‍या‍ईुुे‍ऄजधक‍ू,,‍ददजाप्रा की‍तकनीकी‍ुजमजत‍ जािेी‍पररजस्ट्थजतयों‍में‍जनम्नजलजखत‍की‍ऄनुमजत‍द‍ेुकती‍ू:,[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 281 क) जस्ट्टल्ट‍फ्लजर‍या‍बेुमेंट‍में‍स्ट्ट,क-पार्ककग‍के‍प्रााधान‍के‍मामले‍म,ें न्यूनतम‍उंचाइ‍2.4‍मीटर‍ूजनी‍ चाजूए। ख) ुंबंजधत‍एजेंजुयों‍के‍पूाव‍ऄनुमजदन‍ुे‍भान‍के‍रखरखाा‍के‍जलए‍अाश्यक‍ईपकरणों‍और‍ुेााओं‍ की‍ुंस्ट्थापना‍के‍जलए‍अंतराजयक‍ुर्नाु‍फ्लजर‍की‍ऄनुमजत‍दी‍जा‍ुकती‍ू‍, और‍आुे‍एफएअर‍म‍ें नूीं‍जगना‍जाएगा।‍ुर्नाु‍फ्लजर‍की‍उंचाइ‍का‍जनणवय‍ुंरचनात्मक‍ढांचों‍की‍गूराइ,‍जलभडं ारण,‍ ऄन्‍य‍ईपकरणों‍अदद‍कज‍प्रदान‍करन‍े के‍जलए‍ऄपेजक्षत‍उंचाइ‍के‍अधार‍पर‍दकया‍जाएगा।‍‍भान‍म‍ें ुर्नाु‍फ्लजर‍की‍उंचाइ‍1.8‍मीटर‍तक‍ुीजमत‍ूजगी। iii. यदद‍भान‍का‍जनमावण‍ग,र-रूने‍यजग्य‍उंचाइ‍(2.4‍मीटर) के‍जस्ट्टल्ट‍क्षेत्र‍के‍ुाथ‍दकया‍जाता‍ू‍, और‍ पार्ककग,‍भूदश्ृ ‍यांकन अदद‍के‍जलए‍आुका‍ईपयजग‍दकया‍जाना‍प्रस्ट्ताजात‍ू,, जस्ट्टल्ट‍फ्लजर‍कज‍एफएअर‍ में‍िाजमल‍नूीं‍दकया‍जाएगा। iv. जूां‍भी‍जाजभन्न‍श्रेजणयों‍के‍भखू ंडों‍के‍जलए‍भान‍जाजनयम‍ददए‍गए‍ूों,‍कार‍एररया‍और‍फ्लजर‍एररया‍ दकुी‍भी‍मामले‍में‍पूावाती‍श्रणे ी‍में‍ुबुे‍बड़े‍भूखंड‍के‍जलए‍क्रमिः‍ऄनुमत‍कार‍एररया‍और‍फ्लजर‍ एररया‍ुे‍कम‍नूीं‍ूजगा। v. 'अााुीय‍भूखण्‍ड‍-‍प्लॉटेड‍ूाईलुग' कज‍छजड़कर, 1000‍ागवमीटर‍और‍ईुुे‍ऄजधक‍अकार‍के‍ुभी‍ भूखंडों‍के‍मामल‍े म,ें ‍व्‍यास्ट्‍था‍के‍ऄनुुार‍प्रांगण‍की‍ऄनुमजत‍दी‍जाएगी-‍प्रागं ण‍ईपलब्ध‍ ‍कराने‍के‍जलए‍ ऄजधकतम‍10%‍ऄजतररि ‍ग्राईंड‍कारेज‍की‍ऄनुमजत‍दी‍जाएगी।‍यदद‍प्रागं ण‍के‍जलए‍ऄनुमये ‍ऄजतररि ‍ ग्राईंड‍कारेज‍का‍ईपयजग‍दकया‍जाता‍ू,, ईपयजग‍दकए‍गए‍ग्राईंड‍कारेज‍का‍25%‍एफएअर‍म‍ें जगना‍ जाएगा। 22.15.6 अााुीय‍ईपयजग‍पररुरों‍के‍भीतर‍गर, -अााुीय‍ईपयजग‍के‍जलए‍मानदडं i. अााुीय‍ईपयजग‍पररुर‍के‍भीतर‍तीन‍प्रकार‍की‍ग,र-अााुीय‍गजतजाजधयों‍की‍ऄनुमजत‍दी‍जाएगीः क. प्रजफेिनल‍गजतजाजधया ाँ ख. ऄन्य‍गजतजाजधयााँ‍-‍्ााुाजयक‍और‍पीएुपी‍का‍ईपयजग‍ ग. घरेलू‍ईद्यजग ii. लुरटयंु‍बंगला‍जजन, जुजाल‍लाआंु‍बंगला‍जजन, ुरकारी‍अााु, ुाावजजनक‍और‍जनजी‍एजेंजुयों‍के‍ुंस्ट्थागत‍/‍ कमवचारी‍अााु‍और‍धरजूर‍ुंरक्षण‍ुजमजत‍द्वारा‍ऄजधुूजचत‍और‍धरजूर‍भानों/पररुरों‍के‍जलए‍धरजूर‍ुंरक्षण‍ ुजमती/ुक्षम‍प्राजधकारी‍का‍अाश्‍यक‍ऄनुमजदन‍प्राप्त‍करने‍के‍बाद‍ूी‍‍ग,र‍अााुीय‍प्रयजग‍की‍ऄनुमजत‍दी‍ जाएगी।‍ iii. जमजश्रत‍ईपयजग‍क्षत्रे /ुड़कों‍कज‍जचजनन्त‍करना:‍ जनम्न‍ जलजखत‍ुड़कों/क्षेत्रों‍कज‍आु‍खंड‍के‍प्रयजजन‍ूते ‍ु जमजश्रत‍ईपयजग‍क्षेत्र/ुड़ृक‍और‍कमर्नियल‍ुड़कों‍के‍रूप‍म‍ें ुमझा‍जाएगा:‍ क. ुक्षम‍प्राजधकारी‍द्वारा‍जमजश्रत‍ईपयजग‍ुड़क‍या‍कर्नमियल‍ुड़क‍के‍रूप‍म‍ें पूल‍े ु‍े ऄजधुूजचत‍ुभी‍ ुड़क‍और‍स्ट्‍रेच‍(क्षेत्र‍जास्ट्‍तार)‍ ख. अााुीय‍क्षेत्र‍और‍ुड़क/कजमर्नियल‍क्षेत्र/ुड़क‍के‍रूप‍में‍पूले‍घजजीत‍स्ट्‍रेच‍(क्षेत्र‍जास्ट्तार)‍या‍जूा‍ं मुख्य‍ ‍यजजना‍ददल्ल‍ ी‍एनपीडी‍1962‍म‍ें कर्नमियल‍ईपयजग‍ऄनुमत‍था,‍कज‍ईु‍ुीमा‍तक‍जज‍‍एमपीडी- 1962‍के‍ऄनुुार‍ऄनुमेय‍थी,‍जारी‍रूगें े। ग. ईनके‍दस्ट्‍तााेजी‍ुाक्ष्य‍ ‍के‍ऄ्‍याधीन‍अााुीय‍क्षेत्रों‍में‍1962‍ुे‍पूाव‍मौजूद‍कमर्नियल‍गजतजाजधयां।‍282 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] घ. 1962‍पूाव‍कालजजनयों‍में‍प्‍लॉरटड‍जाकाु‍कज‍आु‍ऄ्‍याय‍के‍प्रयजजन‍ूते ु‍ईनकी‍ुंबंजधत‍श्रेजणयों‍(ए‍ु‍े जी)‍में‍पनु ाावु‍कालजजनयों‍के‍रूप‍म‍ेंुमझा‍जाएगा।‍‍‍‍‍‍‍‍ ङ. ुक्षम‍प्राजधकारी‍द्वारा‍ऄजधुचू ना‍की‍प्रदक्रयाधीन‍कजइ‍ुड़क/स्ट्‍रेच‍या‍जूा‍ं यू‍मामला‍ऄजधुूचना‍ प्रदक्रया‍के‍पूरा‍ूजन‍े पर‍ातवमान‍में‍जनणवयाधीन‍ू।, ‍ च. पूले‍जचजनत‍ुड़कों‍के‍ऄलााा‍दकुी‍नइ‍ुउ़क‍कज‍जमजश्रत‍ईपयजग/क‍मर्नियल‍ईपयजग‍ुउ़क‍के‍रूप‍म‍ें ऄजधुूजचत‍नूीं‍दकया‍जाएगा। छ. ददल्‍ली‍मुख्य‍ ‍यजजना-21‍के‍तूत‍जमजश्रत‍ईपयजग‍के‍जलए‍यथा‍ऄनुमजददत‍ुभी‍मौजूदा‍भू-खंडों‍और‍ ईपयजगों‍कज‍ऄनुमजददत‍ितों‍के‍ऄनुुार‍जारी‍रखने‍की‍ऄनुमजत‍ूजगी।‍ iv. प्रजफेिनल‍गजतजाजधया:ाँ प्रजफेिनल‍गजतजाजधयों‍ु‍े अिय‍ईन‍गजतजाजधयों‍ु‍े ू,, जजनमें‍व्‍यााुाजयक‍कौिल‍नामत:‍डॉक्टर, ाकील, ाास्ट्‍तुकार‍और‍चाटवड‍व ऄकाईंटेंट, कंपनी‍ुजचा,‍लागत‍और‍जनमावण‍काय‍व लेखाकार,‍आंजीजनयर, टाईन‍प्लानर, मीजडया‍प्रजफेिनल्ु‍और‍डॉक्यूमेंरी‍दफल्म‍मेकर, म,नेजमेंट*‍प्रजफेिनल‍और‍डायटीजियन /‍न्यूररिजनस्ट्ट्ु‍ु‍े ुंबंजधत‍ुेााएं‍िाजमल‍ू।ैं ‍ुभी‍अााुीय‍ईपयजग‍पररुरों‍(प्‍लॉटेड‍जाकाु‍और‍ग्रुप‍ूाउलुग)‍में‍आनकी‍ ऄनुमजत‍दी‍जाएगी। प्रजफेिनल‍गजतजाजध‍जनम्न‍ जलजखत‍में‍स्ट्‍ाीकायव‍ू‍,: क. ग्रुप‍ूाउलुग‍और‍एकाजधक‍अााुीय‍आकाइयों‍ााल‍े प्‍लॉटेड‍जाकाु‍म,ें दकुी‍भी‍तल‍पर‍प्रत्‍येक‍ अााुीय‍आकाइ‍के‍ऄनुमेय‍ऄथाा‍स्ट्ाीकृत‍एफएअर,‍जज‍भी‍कम‍ूज,‍के‍ऄजधकतम‍50%‍के‍ऄधीन‍ प्रजफेिनल‍गजतजाजध‍ऄनुमत‍ूजगी। ख. एकल‍अााुीय‍आकाइ‍ााल‍े प्ल‍ ाटेड‍जाकाु‍के‍मामल‍े म,ें ‍प्रजफेिनल‍गजतजाजध‍केाल‍दकुी‍एक‍ मंजजल‍पर‍ूी‍ऄनुमेय‍ूजगी, लेदकन‍यू‍ईु‍प्ल‍ ॉट‍पर‍ऄनुमत‍ऄथाा‍स्ट्‍ाीकृत‍एफ‍ए‍अर‍, जज‍भी‍ कम‍ूज, के‍50%‍ुे‍कम‍तक‍प्रजतबंजधत‍ूजगी‍। ग. प्‍लॉटेड‍जाकाु‍में‍जनमावण‍ईप-कानूनों,‍ुंरचनात्मक‍ुुरक्षा‍मानदंडों‍और‍ऄजग्न‍िमन‍ुुरक्षा‍मजं ूरी‍के‍ ुंबद्ध‍प्रााधानों‍‍के‍‍ऄधीन‍बेुमेंट‍म‍ें प्रजफेिनल‍गजतजाजध‍ऄनुमत‍ू।, ‍यदद‍बेुमेंट‍का‍प्रजफेिनल‍ गजतजाजध‍के‍जलए‍ईपयजग‍भूखण्‍ड‍पर‍ऄनुमेय‍एफएअर‍ुे‍ऄजधक‍ूज‍जाता‍ू,, तज‍ऐुे‍ऄजतररक्‍त‍ एफएअर‍का‍ईपयजग‍ुरकार‍के‍ऄनुमजदन‍ुे‍जनधावररत‍ईजचत‍िल्ु क‍के‍भगु तान‍के‍ऄधीन‍दकया‍ जाएगा। घ. अााुीय‍आकाइ‍कज‍जमलाने‍की‍ऄनुमजत‍नूीं‍दी‍जाएगी।‍ऐुी‍गजतजाजधयां‍अयजजजत‍‍करने‍के‍जलए‍ ुंबंजधत‍एजेंजुयों‍ुे‍ुभी‍अाश्यक‍लाआुेंु, ऄनुमजत‍और‍मजं ूरी‍प्राप्त‍की‍जाएगी। v. घरेल‍ूईद्यजग‍ औद्यजजगक‍ गजतजाजधयों‍ (ऄनलु ग्‍नक-4‍ म‍ें ुूचीबद्ध)‍ जनम्न‍ जलजखत‍ ितों‍ के‍ ऄनुुार‍ ुभी‍ अााुीय‍ ईपयजग‍ पररुरों‍में‍घरेलू‍ईद्यजगों‍के‍रूप‍में‍ऄनुमजत‍दी‍जाएगी।‍ क. कामगारों‍की‍ऄजधकतम‍ुंख्‍या-9 ख. ऄजधकतम‍जाद्यतु ‍भार‍(पाार‍लजड):‍11‍दकलज‍ााट‍ ग. पररुर‍के‍भीतर‍दकुी‍ज्ा‍ लनिील‍या‍खतरनाक‍पदाथ‍वकज‍नूीं‍रखा‍जाएगा।‍ घ. अााुीय‍आकाइ‍के‍50%‍ऄनमु ेय‍तल‍क्षेत्र‍की‍ुीमा‍तक‍दकुी‍तल‍पर‍घरेलू‍अद्यजजगक‍आकाइ‍की‍ ऄनुमजत‍ूजगी।‍बेुमेंट‍में‍आु‍तरू‍की‍गजतजाजधयों‍की‍ऄनुमजत‍नूीं‍ूजगी।‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 283 ङ. ऄलग‍औद्यजजगक‍आल,जक्रक‍कनक्, ि‍ न‍(लुगल‍फेज)‍और‍नगर‍जनगम‍लाआुेंु‍ुंबं‍जधत‍प्राजधकाररयों‍ुे‍ प्रापत‍दकया‍जाएगा।‍ च. ‍अााुीय‍क्षेत्रों‍में‍एनजडाआज‍करने,‍ब्ल‍ ीच‍करन,े ‍कजयला‍जलान,े ‍जडब्‍बाबदं ‍ुजु ाधा,‍आाआ‍करन,े‍आलक्े र‍ज‍ प्‍लेरटग,‍मजलल्डग‍कायव,‍ुीएफुी‍ग,ु‍के‍ईपयजग,‍ाार्ननि‍करन,े ‍धुलाइ‍करने‍और‍ऄन्‍य‍ऄजधक‍जल‍ ईपयजग‍ााली‍प्रदक्रयाओं‍ज,ुे‍कायों‍कज‍करने‍की‍ऄनुमजत‍नूीं‍ूजगी।‍ vi. जमजश्रत‍ईपयजग‍म‍ें्ााुाजयक‍और‍ऄन्य‍गजतजाजधयों‍की‍ऄनमु जत क. ्ााुाजयक‍गजतजाजधया ाँ ताजलका 22.84 जचजन्ूत‍जमजश्रत‍ईपयजग‍क्षेत्रों‍/‍ुड़कों‍और‍्ााुाजयक‍ुड़कों‍में‍ऄनुमत‍गजतजाजधयों‍के‍प्रकार गजतजाजधया ाँ ऄनमु त‍ईपयजगों‍के‍प्रकार ऄजधुजू चत‍जमजश्रत‍ईपयजग‍ ऄजधुजू चत‍्ााुाजयक‍ुड़कों‍के‍ ुड़कों‍के‍मामल‍ेम ें मामल‍ेम ें ्ााुाजयक - खुदरा‍दकु ान, मरम्मत‍ ऄनुमत‍भूजम‍कारेज‍तक‍ुंपूण‍व क. एफएअर‍के‍100% ‍तक‍ भूतल। की‍दकु ान, कार्नमक‍ ऄनुमत ुेाा‍की‍दकु ान ख. एलएुुी‍में‍ऄनुमत‍ुभी‍ - कायावलय ईपयजगों‍की‍ऄनुमजत‍दी‍जाएगी - रेस्ट्टजरेंट ग. बैंक्वेट‍ूॉल‍की‍भी‍ऄनुमजत‍ूजगी नजट:‍ i. जमजश्रत‍ईपयजग‍के‍ऄतं गतव ‍जनम्न‍जलजखत‍गजतजाजधयों‍की‍ऄनमु जत‍नूीं‍ूजगी:‍ क. ‍भान‍जनमावण‍ुामग्री‍(रटम्‍बर,‍रटम्‍बर‍ुे‍बने‍ईत्‍पाद‍(फनीचर‍कज‍छजड़कर)‍माबवल‍लजू‍और‍आस्ट्‍पात‍(बजरी,‍ ुीमेंट‍और‍बालू‍रेत‍2),‍ईंधन‍कजयला‍और‍कजइ‍अग‍पकड़ने‍ााले‍पदाथव‍और‍ऄन्‍य‍भारी‍ुामग्री‍की‍खुदरा‍ दकु ाने‍(ररटेल‍िॉप)‍ ख. ऑटज‍मजबाआल,‍टायर‍रीुजललग‍और‍री-रेयलडग‍और‍ब,टरी‍चाजव‍करने‍की‍मरम्‍मत‍िॉप/ाकविॉप।‍ ग. भंडारण,‍गजदाम‍और‍ाेऄर‍ूाईलुग)‍ घ. जंक‍िॉप‍(जुााए‍पेपर‍और‍ग्ल‍ ाु‍ाेस्ट्‍ट‍कज‍छजड़कर)‍ ङ. िराब‍की‍दकु ान‍ च. जप्ररटग‍डाईंग‍और‍ाार्ननलिग‍ छ. कजइ‍ऄन्‍य‍गजतजाजध‍जजुे‍भारत‍ुरकार‍द्वारा‍ुमय-ुमय‍पर‍ऄजधुूजचत‍दकया‍गया‍ूज।‍‍ ii. 24‍मीटर‍और‍ईुु‍ेऄजधक‍मागाजव धकार‍ााली‍जमजश्रत-‍ईपयजग‍ऄथाा‍्ााुाजयक‍ऄजधुजू चत‍ुड़कों‍पर  पररष्क‍ृत‍जनमाणव ‍ुामग्री‍(बजरी, रेत‍और‍ुीमेंट‍ुजूत)‍की‍दकु ानों‍कज‍केाल‍तभी‍ऄनुमजत‍दी‍जाएगी‍जब‍कजइ‍ करटग‍और‍पॉजललिग‍गजतजाजध‍नूीं‍की‍जाती‍ू।, ‍ऄजधकतम‍50%‍भूजम‍कारेज‍ााले‍न्यूनतम‍100‍ागवमीटर‍के‍ भूखंडों‍पर‍आनकी‍ऄनुमजत‍दी‍जाएगी।  ऑटजमजबाआल‍मरम्मत‍की‍दकु ानों‍और‍ाकविॉपों‍कज‍30‍मीटर‍या‍ईुुे‍ऄजधक‍मागावजधकार‍पर‍ऄनुमजत‍दी‍ जाएगी। दद.जा.प्रा.‍के‍फ्लट, ों‍के‍मामल‍ेम,ें ऄजधुजू चत‍ुड़कों‍पर‍फ्लट, ों‍के‍परू े‍भतू ल‍कज‍जनम्नानुु ार‍ऄनमु जत‍दी‍जाएगी:  केाल‍एक‍छजटी‍दकु ान-‍ऄजधकतम‍20‍ागवमीटर‍क्षेत्र‍की‍ऄनुमजत‍ूजगी।  फ्ल,टों‍कज‍जमलान‍े की‍ऄनुमजत‍नूीं‍ूजगी।284 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] यदद‍गर, -अााुीय‍गजतजाजधयों‍के‍जलए‍बेुमेंट‍का‍ईपयजग‍प्लॉट‍पर‍ऄनुमेय‍एफएअर‍ु‍े ऄजधक‍ूज‍जाता‍ू,, तज‍ऐु‍े ऄजतररि ‍एफएअर‍का‍ईपयजग‍ुक्षम‍प्राजधकारी‍द्वारा‍जनधावररत‍ईजचत‍िुल्क‍के‍भुगतान‍के‍ऄधीन‍ूजगा। ख. ऄन्य‍गजतजाजधया ं मजटे‍तौर‍पर‍जनर्ददष्ट‍ितों‍के‍ऄनुुार‍और‍जनधावररत‍न्यनू तम‍मागावजधकार‍की‍ुड़कों‍के‍अुपाु‍के‍भूखंडों‍पर‍"ऄन्य‍ गजतजाजध"‍ 'ुाावजजनक‍और‍ऄधव-ुाावजजनक' ुुजाधाओं‍की‍प्रकृजत‍की‍ूजती‍ू।, अााुीय‍भूखंडों‍म‍ें ऄनुमेय‍ऄन्य‍गजतजाजधयों‍के‍जलए‍जनम्नजलजखत‍ित‍ें लाग‍ू ूोंगी, चाू‍े ुड़क‍कज‍जमजश्रत‍ईपयजग‍ााली‍ ुड़क‍के‍रूप‍म‍ेंऄजधुूजचत‍दकया‍गया‍ूज‍ऄथाा‍नूीं: i. क, ख, ग‍और‍घ‍कालजजनयों‍में, न्यूनतम‍200‍ाग‍व मीटर‍ााल‍े ‍भूखंडों‍पर‍और‍ड,‍च,‍छ‍कालजजनयों‍में‍न्यनू तम‍ 75‍ागव‍मीटर‍भूखंडों‍पर‍ुभी‍गजतजाजधयों‍की‍ऄनुमजत‍दी‍जाएगी।‍न्‍यूनतम‍मागावजधकार‍आु‍प्रकार‍ूजगाः ताजलका 22.85 ऄन्य‍गजतजाजधयों‍के‍जलए‍न्यनू तम‍मागाजव धकार‍ित ें कॉलजनी‍के‍प्रकार ित व ए‍और‍बी‍कॉलजजनया ाँ केाल‍24 मी.‍और‍ईुुे‍ऄजधक‍मागावजधकार‍पर ुी‍और‍डी‍कॉलजजनयााँ जनयजमत‍अााुीय‍प्ल‍ ॉटेड‍जाकाु‍में,‍केाल‍24‍मी.‍या‍ईुुे‍ऄजधक‍मागावजधकार,‍पुनाावु‍ कॉलजजनयों‍और‍जनयजमत-ऄनजधकृत‍कॉलजजनयों, पुनाावु‍कॉलजजनयों, मागावजधकार‍और‍िूरी‍ गााँाों‍में‍9‍मीटर‍मागावजधकार‍। इ, एफ‍और‍जी‍ जनयजमत‍अााुीय‍प्ल‍ ॉटेड‍जाकाु‍में,‍केाल‍13.5‍मी.‍या‍ईुुे‍ऄजधक‍मागावजधकार,‍पुनाावु‍ कॉलजजनयााँ कॉलजजनयों‍और‍जनयजमत-ऄनजधकृत‍कॉलजजनयों, पुनाावु‍कॉलजजनयों, एओडब्‍ल्‍युू ी‍और‍िूरी‍ गााँाों‍में‍9‍मीटर‍मागावजधकार‍।‍ नजटः दद.मु.यज.-21‍के‍प्रााधानों‍के‍ऄनुुार‍ुभी‍प्रकार‍की‍कॉलजजनयों‍(मौजूदा‍‍मुख्य‍ ‍यजजना‍‍की‍ऄजधुूचना‍ुे‍पूल)े ‍म‍ें स्ट्ाीकृत‍दकुी‍भी‍मौजूदा‍ईपयजग‍की‍ऄनुमजत‍देना‍जारी‍रूगे ा‍। ii ऄन्य‍गजतजाजधयों‍म‍ेंजनम्नजलजखत‍िाजमल‍ूोंग:े ताजलका‍22.86‍जचजन्ूत‍जमजश्रत‍ईपयजग‍क्षत्रे ों‍/‍ुड़कज‍और‍्ााुाजयक‍ुड़कज‍म‍ेंऄनमु त‍ऄन्य‍गजतजाजधया ाँ ऄन्य‍गजतजाजधया ं ऄनमु त‍ईपयजगों‍के‍प्रकार ऄन्य‍ित व पीएुपी  बैंक क. ऄनुमेय‍एफएअर‍का‍ऄजधकतम‍2/3‍भाग‍  औीधालय, जक्लजनक, ईपयजग‍दकया‍जा‍ुकता‍ू।, ‍ूालााँदक, बैंक‍600‍ जक्लजनकल‍प्रयजगिाला, ागव‍मीटर‍तक‍ुीजमत‍रूगे ा। प,थजलॉजी‍प्रयजगिाला, छजटे‍ ख. 24‍मी.‍मागावजधकार / ऄजधुूजचत‍जमजश्रत‍ ईपयजग‍/‍्ााुाजयक‍ुड़क‍ु‍ेुटे‍भू‍खडं ों‍पर‍ ुंग्रू‍केंद्र, प्रुूजत‍गृू, नर्मुग‍ ुभी‍गजतजाजधयााँ‍ऄनुमत‍एफएअर‍के‍100% ूजम‍/‍पॉलीजक्लजनक तक‍स्ट्ाीकाय‍व ूोंगी ।  प्राथजमक‍स्ट्ाास्ट््य‍केंद्र, नर्मुग‍ ग. बैंक‍लॉकर‍यदद‍मौजूदा‍बैंक‍का‍भाग‍ू‍ैंतज‍ ूजम, परराार‍कल्याण‍केंद्र‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 285 जििु‍जचदकत्ुा‍केंद्र‍/‍ ईनकों‍ईन्‍ूीं‍पररुरों‍में‍ुंबंजधत‍बेंुमेंट‍में‍ जराजचदकत्ुा(जेररयाररक)‍केंद्र‍ ऄनुमजत‍ूजगी।‍ ,डॉयजग्‍नजजस्ट्टक‍केंद्र, स्ट्ा,जच्छक‍ घ. क‍एां‍ख‍कॉलजजनयों‍म‍ेंजनम्न‍ जलजखत‍की‍ स्ट्ाास्ट््य‍ुेााए ं आत्‍यादद।‍ ऄनुमजत‍ूजगी।‍  स्ट्ास्ट्थता‍केन्द्र‍जजुमें‍डे‍  गेस्ट्‍ट‍ूाईु‍(लॉलजग‍ूाईु‍ुजूत) स्ट्पा/ाजन‍घटाने‍ााल‍े  न,दाजनक‍केंद्र‍ केन्द्र/अयुाेददक‍ईपचार‍प्रदान‍  प्रुुजत‍गृू,नर्मुग‍ूजम/पॉली‍क्ल‍ ीजनक,‍ करने‍ााल‍ेअयुाेददक‍ प्राथजमक‍स्ट्‍ाास्ट्‍्‍य‍केंद्र,‍परराार‍कल्‍याण‍केंद्र,‍ केन्द्र/दफटनेु‍और‍ुौंदयव‍ बाल‍जचदकत्‍ुा‍केंद्र,‍जेररएरटक‍केंद्र,जास्ट्‍तार‍ जचदकत्ुा‍ुेााओं‍की‍पेिकि‍ स्ट्‍ाास्ट्‍्‍य‍देखभाल‍ुुजाधाएं‍(ज,ुे-रांलजिन‍ करने‍ााल‍ेु,लनू ‍िाजमल‍ू।ैं  प्री-प्राआमरी‍/‍नुवरी‍/‍मोंटेुरी‍ ूजम,‍ररुपाआट‍केयर‍ुेंटर,‍जाकलांग‍और‍ स्ट्कूल; प्ले‍स्ट्कूल मानजुक‍रूप‍ुे‍जाकलागं ‍व्‍यजि यों‍के‍जािेी‍ ुुजाधाएं।‍‍  क्रेच‍और‍डे‍केयर‍ुेंटर  प्री-प्राआमरी‍/‍नुवरी, मॉन्टेुरी‍/‍क्रेच‍/‍ड‍े केयर‍  कजलचग‍ुेंटर, कंप्यूटर‍प्रजिक्षण‍ के‍ईपयजग‍की‍ऄनुमजत‍ूजगी। ुंस्ट्थान  बैंकों‍,‍ग,र‍ुरकारी‍ुंगठनों‍दफटनेु‍ुेंटर‍  ्ााुाजयक‍प्रजिक्षण‍केंद्र, और‍स्ट्‍ास्ट्थ‍ ता‍केंद्रों‍कज‍एमपीडी-2021.‍के‍ कौिल‍केंद्र, कजलचग‍केंद्र, प्रााधानों‍के‍ऄनुुार‍ऄनुमजत‍ूजगी।‍  ाररष्ठ‍नागररकों‍की‍ब,ठक‍कक्ष, बैंक्वेट‍ूॉल, आनडजर‍खले ‍ ङ. बेुमेंट‍में‍प्री-प्राआमरी/नुवरी, मॉन्टेुरी/‍क्रेच‍/‍ ुुजाधाएं, दफटनेु‍ुेंटर‍और‍ डे‍केयर‍के‍ईपयजग‍की‍ऄनुमजत‍नूीं‍ूजगी। जजम च. 24‍मीटर‍मागावजधकार‍ााली‍ुड़कों‍पर‍  ऄजतजथ‍गृू‍(लजलजग‍ूाईु‍ न्यूनतम‍1000‍ागवमीटर‍क्षेत्र‍ााले‍भूखंडों‍पर‍ ुजूत)‍कमरों‍की‍ुंख्या‍के‍ जस्ट्कललग‍ुेंटर, कजलचग‍ुेंटर, कंप्यूटर‍प्रजिक्षण‍ जबना। ुंस्ट्‍थान‍के‍जलए‍ईपयजग‍‍की‍ऄनुमजत‍दी‍ जाएगी। छ. 24‍मीटर‍और‍ईुुे‍ऄजधक‍मागावजधकार‍पर‍ ूी‍बैंक्वेट‍ूॉल‍की‍ऄनुमजत‍दी‍जाएगी।‍ये‍ बेुमेंट‍और‍भूतल‍तक‍प्रजतबंजधत‍रूगें े। ज. स्ट्ाास्ट््य‍ुुजाधाओं‍के‍मामले‍म,ें अााुीय‍क्षेत्रों‍ में‍जादकरण‍(रेजडएिन)‍अधाररतजधयों‍की‍ ऄनुमजत‍नूीं‍दी‍जाएगी। झ. 07.02.2007‍कज‍मौजूद‍और‍लाग‍ूऄजधजनयमों‍ के‍तूत‍पंजीकृत‍केाल‍ग,र-लाभकारी‍ुंगठनों /‍ ग,र‍ुरकारी‍ुगं ठनों‍का‍ुंचालन‍जारी‍रू‍ ुकता‍ू।, ञ. ऄजधुूचना‍की‍तारीख‍पर‍या‍ईुुे‍पूले‍ मौजूद‍केाल‍ईपयुक्त‍ ‍ा,ध‍लाआुेंुधारक‍और‍ ुभी‍ा,धाजनक‍मंजूररयों‍ााले‍भूतल‍पर‍जस्ट्थत‍ रेस्ट्तरों‍कज‍ूी‍ऄजधुूजचत‍जमजश्रत‍ईपयजग‍ ुड़कों‍पर‍ऄनुमजत‍दी‍जाएगी‍। viii. चारदीाारी‍िूर‍तथा‍ुास्ट्ं कृजतक‍पररुीमाओं‍म‍ेंजमजश्रत‍ईपयजग‍के‍ऄधीन‍्ााुाजयक‍एा‍ंऄन्य‍गजतजाजधयों‍की‍ ऄनमु ये ता286 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ताजलका‍22.87‍चारदीाारी‍िूर‍तथा‍ुास्ट्ं कृजतक‍पररुीमाओं‍के‍भाग‍के‍रूप‍म‍ेंजचजन्ूत‍भखू डं ों‍के‍जलए‍लाग‍ूमानदडं ऄनमु त‍ईपयजग‍के‍प्रकार मागाजव धकार‍की‍अाश्यकता न्यनू तम‍भखू डं ‍का‍अकार छजटी‍दकु ान ें कजइ‍न्यूनतम‍अाश्यकता‍ कजइ‍न्यूनतम‍अाश्यकता‍नूीं नूीं ऄजधकतम‍1‍यूजनट‍प्रजत‍भूखंड खुदरा‍दकु ान, मरम्मत‍की‍दकु ान, कार्नमक‍ुेाा‍की‍ न्यूनतम 6 मीटर‍‍ 75 ागव‍मी दकु ान, कायावलय‍और‍रेस्ट्तरां) मागावजधकार  औीधालय, जक्लजनक, जक्लजनकल‍प्रयजगिाला, न्यूनतम 9 मीटर‍‍ 75 ागव‍मी मागावजधकार प,थजलॉजी‍प्रयजगिाला, छजटे‍ुग्रं ू‍केंद्र,  प्रुूजत‍गृू  नर्मुग‍ूजम‍/‍पॉलीजक्लजनक  प्राथजमक‍स्ट्ाास्ट््य‍केंद्र  परराार‍कल्याण‍केंद्र  जििु‍जचदकत्ुा‍केंद्र‍/‍जेररयाररक‍केंद्र  डायग्नजजस्ट्टक‍ुेंटर  प्री-प्राआमरी‍/‍नुवरी‍/‍मोंटेुरी‍स्ट्कूल; प्ले‍स्ट्कूल  क्रेच‍और‍डे‍केयर‍ुेंटर  कजलचग‍ुेंटर, कंप्यूटर‍प्रजिक्षण‍ुंस्ट्थान  ाजकेिनल‍रेलनग‍ुेंटर, जस्ट्कललग‍ुेंटर, कजलचग‍ ुेंटर  ााचनालय‍/‍पुस्ट्तकालय, युाा‍केंद्र, ाररष्ठ‍ नागररकों‍के‍जलए‍ब,ठक‍कक्ष,‍‍्यान‍ /अ्याजत्मक‍प्रजिक्षण‍के‍जलए‍ुुजाधाएं, बैंक्वेट‍ ूॉल, आनडजर‍खले ‍ुुजाधाए,ं स्ट्ाास्ट््य‍केंद्र‍और‍ जजम, लघु‍धार्नमक‍ुुजाधा, डाकघर‍काईंटर ix. ग्रपु ‍ूाईलुग‍म‍ेंगर, -अााुीय‍गजतजाजधया ाँ ल-े अईट‍प्‍लान‍में‍जािेी‍रूप‍ुे‍ईपबंजधत‍ग्रपु ‍ूाईलुग‍भूखडं ों‍के‍मामल‍े म,ें ‍ऄनुमत‍एफएअर‍ऄथाा‍1000 ागवमीटर‍जज‍ भी‍कम‍ूज, छजटी‍दकु ान‍और‍खुदरा‍दकु ान, मरम्मत‍की‍दकु ान, कार्नमक‍ुेाा‍की‍दकु ान‍का‍ईपयजग‍के‍ऄजधकतम‍1.5%‍ तक की‍ऄनुमजत‍दी‍जाएगी।‍स्ट्थानीय‍अाश्यकताओं‍की‍पूर्नत‍करने‍ााली‍छजटी‍दकु ानों‍की‍आकाआयों‍के‍प्रााधान‍के‍जलए‍ ऐुी‍एफएअर‍का‍कम‍ुे‍कम‍50%‍ऄजनाायव‍रूप‍ुे‍ईपयजग‍दकया‍जाएगा।‍प्रत्येक‍20‍ागवमीटर‍की‍न्यूनतम‍4‍दकु ान‍ें प्रदान‍की‍जाएगं ी।‍आु‍तरू‍के‍ईपयजग‍उ्ाावधर‍जमश्रण‍या‍भूखंड‍के‍भीतर‍ऄलग‍ब्लॉक‍के‍रूप‍म‍ें प्रदान‍दकए‍जा‍ुकत‍े ू।ैं x. अााुीय‍जाकाु‍के‍भीतर‍ुभी‍गर, -अााुीय‍गजतजाजधयों‍पर‍लाग‍ूऄजतररि ‍मानदडं : क. डीुीएन, ज,ुा‍दक‍जािेी‍अााुीय‍ईपयजग‍के‍जलए‍लाग‍ू ूजता‍ू,, आु‍ूते ‍ु लागू‍ूजना‍जारी‍रूगे ा‍भल‍े ूी‍ भूखंड/अााुीय‍आकाइ‍कज‍जमजश्रत‍ईपयजग‍म‍ेंरखा‍गया‍ूज।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 287 ख. प्लॉटेड‍ूाईलुग‍भूखडं ों‍म‍ें चारदीाारी‍मुख्य‍ ‍पुएचं ‍ुड़क‍के‍ुाथ‍ा,कजल्पक‍ूजगी।‍जस्ट्टल्ट‍पार्ककग‍ााल‍े भूखंडों‍में, दकु ान‍ऄग्रभाग‍और‍ऄन्य‍ऄनमु त‍जमजश्रत‍ईपयजग‍गजतजाजधयों‍कज‍प्रदान‍करके‍ुदक्रय‍फ्रंटेज‍कज‍बनाए‍रखा‍ जाएगा।‍ऐुी‍दकु ानों‍की‍एफएअर‍के‍तूत‍गणना‍की‍जाएगी। ग. जूां‍भी‍‍ुर्नाु‍ुड़क‍ईपलब्ध‍ू‍, ऄथाा‍प्रस्ट्ताजात‍ू,, तज‍जमजश्रत‍ईपयजग‍पररुर‍कज‍ऐुी‍ुर्नाु‍ुड़क‍ुे‍पुएचं ‍ प्रदान‍की‍जाएगी, न‍दक‍ुीधे‍मुख्य‍क,ररजाे‍ुड़क‍ुे। घ. ुड़कों‍ऄथाा‍ुाावजजनक‍भूजम‍पर‍दकुी‍भी‍प्रकार‍के‍ऄजतक्रमण‍की‍ऄनुमजत‍नूीं‍दी‍जाएगी। ङ. दकुी‍भी‍प्रकार‍के‍अपजिजनक, खतरनाक, ज्ालनिील, ग,र-ुंगत‍और‍प्रदीू णकारी‍पदाथ‍व या‍प्रदक्रया‍ुे‍जुड़े‍ दकुी‍भी‍्ापार‍या‍गजतजाजध‍की‍ऄनुमत‍नूीं‍दी‍जाएगी। च. लाग‍ूप्रभार‍जनम्नानुुार‍ूोंगेः  ग,र-अााुीय‍गजतजाजधयों‍ााले‍ुभी‍पररुरों‍के‍जलए‍ुबं ंजधत‍स्ट्थानीय‍जनकाय‍कज‍ऐुे‍जमजश्रत‍ ईपयजग‍की‍घजीणा‍करने‍की‍अाश्यकता‍ूजगी, और‍ुक्षम‍प्राजधकारी‍द्वारा‍ऄजधुूजचत‍प्रदक्रया‍के‍ ऄनुुार‍अाश्यक‍प्रभारों‍का‍भगु तान‍करना‍ूजगा।  ग,र-अााुीय‍गजतजाजधयों‍ााले‍ुभी‍पररुर‍ुक्षम‍प्राजधकारी‍द्वारा‍ऄजधुूजचत‍दरों‍के‍ऄनुुार, ईु‍ ऄाजध‍के‍जलए‍, जजुके‍दौरान‍ग,र-अााुीय‍गजतजाजधयों‍के‍जलए‍ुंपजि‍का‍ईपयजग‍दकया‍गया‍ू,, ुंबंजधत‍स्ट्थानीय‍जनकाय‍कज‍लागू‍जमजश्रत‍ईपयजग‍प्रभार‍का‍भुगतान‍करन‍े के‍जलए‍ईिरदायी‍ूोंगे।  अांरटती/माजलक‍दकुी‍भी‍गर, -अााुीय‍गजतजाजध‍के‍जलए‍पररुर‍का‍ईपयजग‍करन‍े ुे‍पूल‍े ुभी‍ अाश्यक‍िल्ु क‍ऄथाा‍प्रभारों‍का‍भुगतान‍करेगा।  जमजश्रत‍ईपयजग‍के‍तूत‍ुंपजियों‍की‍परीक्षण‍जांच‍के‍जलए‍ुंबंजधत‍स्ट्थानीय‍जनकाय‍जजम्मेदार‍ूजगा, चाू‍ेाू‍आुके‍ुाथ‍पंजीकृत‍ूज‍ऄथाा‍नूीं।  ुंबंजधत‍ऄजधजनयम‍के‍तूत‍ईपलब्ध‍ऄन्य‍दडं ात्मक‍कारवााइ‍के‍ऄलााा, जबना‍पंजीकरण‍के‍ऄथाा‍आु‍ ऄजधुूचना‍की‍ितों‍का‍ईल्लघं न‍करते‍ुएए‍जमजश्रत‍ईपयजग‍में‍पाए‍जाने‍ााली‍ुंपजियां, स्ट्थानीय‍ जनकाय‍कज‍ऐुे‍ऄथवदंड‍का‍भगु तान‍करन‍े के‍जलए‍ईिरदायी‍ूोंगे, ज,ुा‍दक‍ुक्षम‍प्राजधकारी‍द्वारा‍ ुमय-ुमय‍पर‍जनधावररत‍दकया‍गया‍ूज। 22.18‍ग्रीन‍ब्ल‍ूफ,क्टर‍(जीबीएफ) जीबीएफ‍की‍गणना‍भूखंड‍स्ट्तर‍पर‍की‍जाएगी, और‍आुे‍ुभी‍भान‍और‍लअे ईट‍ऄनुमजदन‍के‍जलए‍एक‍ितव‍के‍रूप‍म‍ें एकीकृत‍दकया‍जाएगा।‍जीबीएफ‍गणना‍ूते ‍ु ईपयजग‍दकए‍जाने‍ााल‍ेकारक‍और‍कायवप्रणाली‍जनम्नानुुार‍ू:ैं जीबीएफ‍जाजभन्न‍प्रकार‍के‍नीले/ूरे‍तत्ाों‍के‍ऄतं गतव (ज,ुा‍दक‍उपर‍जचजन्ूत‍दकया‍गया‍ू), ‍ईनके‍ुंबंजधत‍कारक‍के‍जारूद्ध‍ कुल‍भूखंड‍क्षेत्र‍के‍क्षेत्रफल‍का‍ऄनुपात‍ूः, ताजलका 22.88‍जीबीएफ‍क,लकुलटे र क्र.ु.ं ब्ल‍ू/‍ग्रीन‍तत्ा ‍(एजलमटें )‍का‍प्रकार‍(X)‍ कारक 1 ऄभेद‍य् ‍ुतू‍(पक्के‍फुटपाथ‍क्षेत्र, काले‍िीी‍व ााले‍ब्‍ल,क‍टॉप‍ड्राआााे‍और‍अतं ररक‍ुड़कें, ूरे‍रंग‍ 0 की‍छत‍के‍बगर, ‍छत‍की‍ुतू‍ुजूत) 2 क्लजरीनयुि ‍पानी‍की‍ुुजाधा‍(ज,ुे‍जस्ट्ालमग‍पलू ) 0.2 3 ूररत‍दीाार‍(बाूरी‍दीाार‍ुतूों‍पर‍पौधों‍के‍जलए‍ुमर्नथत‍उध्‍वााधर‍प्रणाली) 0.2288 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] क्र.ु.ं ब्ल‍ू/‍ग्रीन‍तत्ा ‍(एजलमटें )‍का‍प्रकार‍(X)‍ कारक 4 पानी‍ुजखने‍ााली‍टाआलों‍के‍ुाथ‍पारगम्य‍ुतू 0.3 5 म,नीक्यजर‍दकए‍लॉन‍और/ऄथाा‍ग्रीनूाईु‍के‍ुाथ‍पारगम्य‍ुतू 0.5 6 ूररत‍छत‍(न्यनू तम‍70%‍क्षेत्र‍पौधों‍और‍झाजड़यों‍ुे‍ढंके‍ुएए) 0.6 7 प्राकृजतक‍घाु/म,दान‍और‍ानस्ट्पजत‍के‍ुाथ‍पारगम्य‍ुतू‍(िूरी‍कृजी‍ुजूत) 0.8 8 पेड़‍अच्छादन‍के‍तूत‍क्षेत्र‍(क,नजपी‍ुघनता‍10 ुे‍40%) 0.9 9 ुघन‍पड़े ‍अच्छादन‍के‍ऄधीन‍क्षेत्र‍(क,नजपी‍ुघनता‍40%‍ऄथाा‍ऄजधक) 1 10 ग,र‍ऄािजीी‍तल‍के‍ुाथ‍खुल‍ेजलािय‍(गर, ‍क्लजरीनीकृत) 1 जनम्न‍ुूत्र‍का‍ईपयजग‍करके‍दकुी‍भूखंड‍ूते ‍ु जीबीएफ‍की‍गणना‍जनम्न‍ुूत्र‍का‍ईपयजग‍करके‍की‍जाएगीः जीबीएफ‍= {(तत्ा‍X‍ुगं त‍कारक‍के‍ऄतं गतव ‍अन‍े ााल‍े क्षत्रे ) +... (तत्ा‍nX‍ुगं त‍कारक‍के‍ऄतं गतव ‍अन‍े ााल‍े क्षत्रे )}/ कुल‍भखू डं ‍क्षत्रे 22.19‍जाकाु‍ऄजधकार‍का‍ूस्ट्त‍ ातं रण‍(टीडीअर) ूस्ट्तांतरणीय‍जाकाु‍ऄजधकार‍(टीडीअर)‍का‍ऄथ‍व ू‍, मुख्य‍ ‍यजजना‍द्वारा‍ऄनुमेय‍जाजिष्ट‍स्ट्थानों‍पर‍ऄप्रयि ु ‍जाकाु‍ ऄजधकारों‍के‍एाज‍म‍ें प्रदान‍की‍गइ‍एफएअर।‍टीडीअर‍का‍ईपयजग‍यजजना‍द्वारा‍जचजन्ूत‍टीडीअर‍प्राप्त‍दकए‍जाने‍ााल‍े क्षेत्रों‍म‍ें ूी‍दकया‍जा‍ुकता‍ू।, टीडीअर‍ाूा‍ं ददए‍जाएंग,े ‍जूां‍ुाावजजनक‍ईद्देश्य‍ज,ुे‍दक‍अाश्यक‍ऄाुंरचना‍का‍प्रााधान,‍ऐजतूाजुक‍क्षेत्रों‍का‍ पुनुृवजन,‍िूरी‍गरीबों‍के‍जलए‍अााु‍अदद‍के‍जलए‍भूजम/जाकाु‍का‍ऄजधकार‍जब्त‍ ‍दकया‍गया‍ू1, टीडीअर‍कज‍टीडीअर‍प्रमाणपत्र‍के‍रूप‍में‍प्रदान‍दकया‍जाएगा।‍आु‍ूते ‍ु जनर्ददष्ट‍जाजनयमों‍के‍ऄनुुार‍टीडीअर‍प्रमाणपत्र‍ ददल्ली‍जाकाु‍प्राजधकरण‍द्वारा‍जारी‍दकया‍जाएगा।‍आु‍यजजना‍की‍ऄजधुूचना‍के‍6 मूीने‍के‍भीतर‍ददल्‍ली‍जाकाु‍ प्राजधकरण‍द्वारा‍टीडीअर‍के‍कायावन्ायन‍की‍प्रदक्रया‍ुंबंधी‍जाजनयमों‍का‍जाारण‍त,यार‍दकया‍जाएगा। टीडीअर‍प्रमाणपत्र‍केाल‍राष्ट्रीय‍राजधानी‍क्षेत्र‍ददल्ली‍के‍भीतर‍ूी‍जाकाु‍ऄजधकार‍प्रदान‍करेगा। टीडीअर‍प्रमाणपत्र‍स्ट्‍थायी‍रूप‍ुे‍ा,ध‍ूजगा‍और‍माजलक‍आु‍े दकुी‍भी‍ुमय‍ईपयजग‍कर‍ुकता‍ू‍, ऄथाा‍ईुे‍जनयमों‍के‍ ऄनुुार‍दकुी‍ऄन्य‍्जि ‍ऄथाा‍ुंस्ट्था‍कज‍स्ट्थानांतररत‍कर‍ुकता‍ू।, टीडीअर‍प्रमाणपत्र‍पर‍कइ‍लने -दने ‍की‍ऄनुमजत‍ू‍, जब‍तक‍दक‍जारी‍दकए‍गए‍टीडीअर‍के‍कुल‍मूल्य‍का‍ईपयजग‍नूीं‍कर‍ जलया‍जाता।‍एक‍बार‍टीडीअर‍पूरी‍तरू‍ु‍े ुमाप्त‍ूज‍जान‍े के‍बाद,‍टीडीअर‍प्रमाणपत्र‍ऄमान्य‍ूज‍जाता‍ू।, टीडीअर‍ुृजन‍और‍प्राजप्त‍क्षेत्रों‍के‍जनधावरण,‍टीडीअर‍जारी‍करन,े टीडीअर‍ईपयजग‍ु‍े ुंबंजधत‍ुभी‍मामलों‍के‍जलए‍एक‍ ुमर्नपत‍ऑनलाआन‍पजटवल‍स्ट्थाजपत‍दकया‍जाएगा। ईपयजजगता‍ूते ु‍टीडीअर‍की‍गणनाः‍ईपयजग‍के‍जलए‍टीडीअर‍का‍मान/मूल्य‍परू े‍िूर‍में‍भूजम‍मूल्यों‍में‍जभन्नता‍के‍ऄनुुार‍ ऄलग-ऄलग‍ूजगा।‍जभन्नता‍कज‍युजि ुंगत‍बनाने‍और‍प्राजप्त‍स्ट्थल‍पर‍ईपयजग‍दकए‍जाने‍ााले‍टीडीअर‍के‍मूल्य‍की‍गणना‍ करने‍के‍जलए‍जनम्न‍ुूत्र‍लागू‍ूजगा। ताजलका‍22.89‍टीडीअर प्राजप्त‍स्ट्‍थल‍पर‍टीडीअर‍का‍मल्ू ‍य‍=(Rg/Rr) x Y[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 289 जूााँ, Rg = टीडीअर‍प्रमाण‍पत्र‍जारी‍ूजने‍ााल‍ेाीव‍के‍दौरान‍ईत्पन्न‍ूजने‍ााली‍ुाआट‍की‍ुकवल‍दर‍के‍ऄनुुार‍भूजम‍ दर‍रुपये‍प्रजत‍ागवमीटर‍। Rr = ईुी‍ाीव,जजुके‍जलए‍rg‍पर‍जाचार‍दकया‍गया‍ू,,‍के‍प्राजप्त‍स्ट्थल‍की‍ुकवल‍दर‍के‍ऄनुुार‍भूजम‍दर‍रुपये‍ प्रजत‍ागवमीटर‍। Y = ऄप्रयि ु ‍एफएअर‍(प्रमाणपत्र‍म‍ेंयू‍टीडीअर‍मूल्‍य‍की‍ुंपूणव‍ऄथाा‍कुछ‍भाग‍ूज‍ुकती‍ू।, टीडीअर‍ईपयजग‍के‍जलए‍ऄन्य‍ित:ें i. टीडीअर‍का‍ईपयजग‍केाल‍टीडीअर‍प्राजप्त‍क्षेत्रों‍के‍भीतर‍दकया‍जाएगा, जजन्ू‍ें दद.जा.प्रा.‍द्वारा‍ुीमांदकत‍और‍ ऄजधुूजचत‍दकया‍गया‍ूज। ii. टीडीअर‍का‍ईपयजग‍दकुी‍प्राजप्त‍स्ट्थान/भूखंड‍पर‍ऄनुमत‍एफएअर‍के‍ऄजतररि ‍जनमावण‍के‍जलए‍दकया‍जाएगा।‍ iii. कजइ‍भूखंड‍टीडीअर‍का‍ईपयजग‍करने‍के‍जलए‍केाल‍तभी‍पात्र‍ूजगा, जब‍कम‍ुे‍कम‍50%‍क्षेत्र‍ऄजधुूजचत‍ टीडीअर‍प्राजप्त‍क्षेत्र‍के‍भीतर‍अता‍ूज। टीडीअर‍ईपयजग‍ूते ‍ुजचजन्ूत‍टीडीअर‍प्राजप्त‍क्षत्रे ‍और‍ित‍ेंजनम्नजलजखत‍ू:ैं लैंड‍पूललग‍जजनों‍म‍ें टीडीअर‍प्राजप्त‍क्षेत्रः‍केाल‍लैंड‍पूललग‍के‍तूत‍ऄजधुूजचत‍क्षत्रे ‍म‍ें लागू‍िूरी‍जास्ट्तार‍ुड़कों‍(यूइअर)‍ के‍दजनों‍500‍मीटर‍का‍कॉररडजर‍(ुंदभवः‍डीइाी1)। i. न्यूनतम‍18‍मीटर‍मागावजधकार‍ुे‍ुीधे‍पुएचं ‍ााले‍केाल‍न्यूनतम‍3000‍ागवमीटर‍के‍भूखंड, टीडीअर‍प्राप्त‍करन‍े के‍जलए‍पात्र‍ू।ैं ‍प्लॉटेड‍अााु‍टीडीअर‍प्राप्त‍करन‍े के‍जलए‍पात्र‍नूीं‍ूोंगे। ii. टीडीअर‍का‍ईपयजग‍भूखंड‍पर‍ऄनुमत‍ुमान‍भूजम‍ईपयजग‍के‍जलए‍ऄनुमेय‍एफएअर‍के‍ऄजधकतम‍10%‍तक‍ दकया‍जा‍ुकता‍ू।, iii. उ्ाावधर‍जमश्रण‍भूखंडों‍पर‍युजि करण‍के‍ईपरान्त‍दकुी‍भूजम‍ईपयजग‍के‍जलए‍टीडीअर‍का‍ईपयजग‍एफएअर‍के‍ रूप‍में‍दकया‍जा‍ुकता‍ू।, ‍आुे‍प्राप्त‍ूजने‍ााले‍भूखंड‍के‍भूजम‍ईपयजग‍ुे‍जजड़ा‍नूीं‍जाएगा और‍आुका‍ईपयजग‍ अााुीय, ्ााुाजयक, पीएुपी‍ऄथाा‍औद्यजजगक‍एफएअर‍के‍रूप‍म‍ें दकया‍जा‍ुकता‍ू,, बिते‍दक‍ऄजधकतम‍ एफएअर‍ुीमा‍आुुे‍ऄजधक‍न‍ूज, और‍भूखंड‍पर‍ुंगत‍ईपयजगों‍कज‍ुुजनजित‍दकया‍गया‍ूज। iv. टीडीअर‍के‍ईपयजग‍ूते ‍ु ुेक्टर‍स्ट्तर‍पर‍प्रत्येक‍भूजम‍ईपयजग‍के‍जलए‍गणना‍की‍गइ‍एफएअर‍की‍ुीमा‍तक‍ केाल‍10%‍तक‍की‍ाृजद्ध‍की‍ऄनुमजत‍ूजगी। v. ऄजधुूजचत‍टीओडी‍नजड्‍ु‍और‍्ापार‍प्रजत्ुाून‍जजलों‍में‍टीडीअर‍प्राजप्त‍क्षेत्रः vi. न्यनू तम‍1‍ूक्े टेयर‍क्षेत्र‍की‍टीओडी‍यजजनाओं‍ऄथाा‍पुनुृवजन‍यजजनाओं‍के‍रूप‍म‍ें अन‍े ााल‍े केाल‍न्यूनतम‍30‍ मीटर‍मागावजधकार‍ु‍ेुीधी‍पुएचं ‍ााले‍भूखंड‍ूी‍टीडीअर‍प्राप्त‍करन‍े के‍जलए‍पात्र‍ूोंगे। vii. ऄजधकतम‍टीडीअर‍ऄनुमत‍एफएअर‍का‍10%‍ूजगा।‍दकुी‍भूखंड‍पर‍टीडीअर‍ुजूत‍कुल‍एफएअर‍500‍ु‍े ऄजधक‍नूीं‍ूजगा। viii. ऐुी‍यजजनाओं‍पर‍टीडीअर‍का‍ईपयजग‍्ााुाजयक, पीएुपी‍और‍औद्यजजगक‍ईपयजगों‍के‍जलए‍दकया‍जा‍ ुकेगा। 22.20‍ार्टटकल‍जमलक्ुग‍के‍जलए‍मानदं ड i. ुुुंगत‍ईपयजगज‍कज‍दकुी‍भ-ू खंड‍पर‍ईुी‍भान/ुंरचना‍के‍भाग‍रूप‍म‍ें जाकजुत‍दकए‍जाने‍की‍ऄनुमजत‍दी‍ जाएगी।‍ ii. प्रत्‍यके ‍ईपयजग‍के‍जलए‍पृथक‍प्राेिजनकाु‍और‍ुेाा‍कजर‍की‍व्य‍ ास्ट्‍था‍की‍जाएगी।‍290 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] iii. ुुजाधा,‍कॉमुव,‍स्ट्‍कूल‍अदद‍ज,ुे‍ुाावजजनक‍ईपयजगों‍की‍ग्राईंड‍लेाल‍ुे‍ुीधी‍पुएचं ‍तक‍जनचले‍तल‍पर‍ ऄाजस्ट्थत‍ूोंगे।‍ iv. ऄस्ट्‍पताल,‍स्ट्‍ाास्ट्‍्‍य‍देखभाल‍ुुजाधा,‍जाश्‍ाजाद्यालय‍क,म्‍पु,‍ईपयजजगताएं‍ईंधन‍स्ट्‍टेिन‍पाकव‍और‍दकुी‍प्रकार‍की‍ ुिं जधन/पन, ल‍ुजु ाधाओं‍की‍ऄनमु जत‍नूीं‍ूजगी।‍ार्टटकल‍जमलक्ुग‍के‍भाग‍के‍रूप‍म‍ें स्ट्थ‍ ानीय‍जचदकत्ु‍ ा‍ ुुजाधाओं‍‍की‍ऄनुमजत‍ूजगी।‍ v. जमलक्ुग‍की‍ऄनुमजत‍केाल‍ुुुंगत‍ईपयजगों‍के‍जलए‍दी‍जाएगी‍जज‍जनम्न‍ ‍प्रकार‍ुे‍ू।, a. केाल‍ग,र-जाजनमावणकारी‍ईद्यजग‍ज,ु‍े ुेाा‍ईद्यजग‍(अइ‍टी/अइ‍टी‍इ‍एु‍बी‍पी‍ओ/के‍पी‍ओ‍अदद)‍ प‍क, ेलजग‍और‍लॉजजजस्ट्टक‍और‍ग,र‍प्रदीू णकारी‍एम‍एु‍एम‍इ‍यूजनटों‍कज‍पी‍एु‍पी‍के‍ुाथ‍जमलाया‍जा‍ ुकता‍ू।, b. स्ट्‍कूलों‍कज‍केाल‍अााुीय‍ईपयजग‍पररुरों‍के‍ुाथ‍जमलाया‍जा‍ुकता‍ू।, ‍ऄन्‍य‍ि,जक्षक‍ुस्ट्ं ‍थाओं‍कज‍ ऐुे‍स्ट्‍ाच्‍छ‍ईद्यजगों‍के‍ुाथ‍जमलाया‍जा‍ुकता‍ू।, ‍जजनका‍ईल्ल‍ ेख‍उपर‍दकया‍गया‍ू।, ‍‍ --- x --- x ---- x --- x --- x ---[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 291 ुजं क्षजप्तयों‍की‍ुचू ी ए एअइ‍-‍कृजत्रम‍बुजद्धमिा (अर्टटदफजियल‍आंटेजलजेंु) एएअइ-‍एयरपजट‍वऄथॉररटी‍ऑफ‍आंजडया एपीअरएच - ऄफजडेबल‍पजब्लक‍रेंटल‍ूाईलुग‍ एएुअइ‍-‍भारतीय‍पुरातत्ा‍ुाेक्षण एटीए‍-‍ुदक्रय‍यात्रा‍क्षेत्र एक्यूअइ - ाायु‍गुणािा‍ुूचकांक बी बीएंडबी – बेड‍एंड‍ब्रेकफास्ट्ट बीबीएमबी‍-‍भाखड़ा‍ब्याु‍प्रबंधन‍बजड व बीइइ-‍उजा‍वदक्षता‍ब्यूरज बीएफएुअइ‍-‍बैंककग, जािीय‍ुेााएाँ‍और‍बीमा बीअइडी‍–‍जबजनेु‍आंप्रूामेंट‍जडजस्ट्रक बीअइएु‍-‍भारतीय‍मानक‍ब्यूरज बीपीडी‍-‍जबजनेु‍प्रजमजिन‍जडजस्ट्रक बीअरटी - बु‍र,जपड‍रांजजट बीयूए‍–‍जनर्नमत-क्षत्रे ‍(जबल्ड-ऄप‍एररया) ुी ुीबीडी‍-‍केंद्रीय‍्ापार‍जजला ुीएचबीएु - ुूकारी‍अााु‍भान‍ुजुायटी ुीबीओ‍-‍ुमुदाय-अधाररत‍ुगं ठन ुीबीडब्ल्यूटीएफ - ुामान्य‍ज,ा-जचदकत्ुा‍ऄपजिष्ट‍प्रबंधन‍ुजु ाधाएं‍(कॉमन‍बायज-मेजडकल‍ाेस्ट्ट‍रीटमेंट‍फ,जुजलटी) ुीुी - ुामुदाजयक‍केंद्र ुीुीटीाी‍–‍क्लजज्ड़-ुर्दकट‍टेलीजाजन ुीएंडडी‍ऄपजिष्ट‍-‍जनमावण‍और‍डेमजजलिन‍ऄपजिष्ट ुीइटीपी‍-‍कॉमन‍एफ्लुएंट‍रीटमेंट‍प्लांट ुीजीडब्ल्यबू ी - केंद्रीय‍भ-ू जल‍बजडव ुीएमपी‍-‍्ापक‍गजतिीलता‍यजजना‍(कॉम्प्रेूजें ुा‍मजजबजलटी‍प्लान) ुीएनजी‍-‍ुंपीजड़त‍प्राकृजतक‍ग,ु‍(कंप्रस्ट्े ड‍नेचरु ल‍ग,ु) ुीएनुीअर- केंद्रीय‍राष्ट्रीय‍राजधानी‍क्षेत्र‍ ुीपी‍-‍कनॉट‍प्लेु‍ ुीपीुीबी - केंद्रीय‍प्रदीू ण‍जनयंत्रण‍बजड व ुीपीएचइइओ- केंद्रीय‍ुाावजजनक‍स्ट्ाास्ट््य‍और‍पयावारण‍आंजीजनयररग‍ुगं ठन ुीपीडब्ल्यडू ी - केंद्रीय‍लजक‍जनमावण‍जाभाग ुीअरएमपी - ुांस्ट्कृजतक‍ुंुाधन‍प्रबंधन‍यजजना ुीएुुी‍-‍ुुजाधा‍िॉलपग‍केंद्र‍ ुीएुपी-‍ुामुदाजयक‍ुेाा‍कार्नमक ुीएुओ‍-‍जुजाल‍ुजुायटी‍ुंगठन ुीएुअर‍-‍कॉपोरेट‍ुजिल‍ररस्ट्पांुजबजलटी ुीाी‍-‍ााजणजज्यक‍ााून292 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] डी डीुी‍-‍जजला‍केंद्र डीइ-‍डेालपर‍एजन्टटी डीुीएन- जाकाु‍जनयंत्रण‍मानदंड डीुीअर - जाकाु‍जनयंत्रण‍जाजनयम डीडीए - ददल्ली‍जाकाु‍प्राजधकरण डीडीएमए- ददल्ली‍अपदा‍प्रबधं न‍प्राजधकरण डीइ - डेालपर‍एजन्टटी डीएफुी‍-‍डेजडकेटेड‍फ्रेट‍कॉररडजर डीएफएु-‍ददल्ली‍ऄजग्निमन‍ुाे ा‍(ददल्ली‍फायर‍ुर्नाु) डीडीएमए- ददल्ली‍अपदा‍प्रबधं न‍प्राजधकरण डीएमअरुी- ददल्ली‍मेरज‍रेल‍कॉपोरेिन डीअइएमटीएु - ददल्ली‍आंटीग्रटे ेड‍मल्टी-मजडल‍रांजजट‍जुस्ट्टम डीअइएुुीओएम - जातरण‍कंपनी डीजेबी‍-‍ददल्ली‍जल‍बजड व डीएमए‍–‍जडजस्ट्रक्ट‍मीटड‍व एररया‍ डीएमुी - ददल्ली‍नगर‍जनगम डीएमअइुी - ददल्ली‍मुंबइ‍औद्यजजगक‍कजररडजर डीएमअरुी - ददल्ली‍मेरज‍रेल‍कॉपोरेिन डीओएमुी - ददल्ली‍ान-मजजबजलटी‍कंमीिन डीपीुीुी - ददल्ली‍प्रदीू ण‍जनयंत्रण‍ुजमजत डीपीजीएु‍-‍ददल्ली‍पाकव‍एडं ‍गाडवन‍ुजुाआटी डीअरय‍ू-‍अपदा‍प्रजतदक्रया‍आकाइ डीएुए‍-‍डेटा‍िेयररग‍एग्रीमेंट डीएुअइअइडीुी - ददल्ली‍राज्य‍औद्यजजगक‍और‍आंफ्रास्ट्रक्चर‍डेालपमेंट‍कॉरपजरेिन डीटीुी‍-‍ददल्ली‍परराून‍जनगम डीटीअइडीुी - ददल्ली‍परराून‍आंफ्रास्ट्रक्चर‍डेालपमेंट‍कॉरपजरेिन डीयू‍–‍अााुीय‍आकाइ‍(डाेललग‍यूजनट) डीयूएुी - ददल्ली‍िूरी‍कला‍अयजग डीयूएचएफ - ददल्ली‍ऄबवन‍ूरे रटेज‍फाईंडेिन डीयूएुअइबी - ददल्ली‍िूरी‍अश्रय‍ुधु ार‍बजड व डीाीुी‍-‍दामजदर‍घाटी‍जनगम इ इुीएु‍–‍आदक्वा,लेंट‍कार‍स्ट्पेु इुीबीुी- ‍उजाव‍ुंरक्षण‍भान‍कजड इुीएु‍-‍आदक्वा,लेंट‍कार‍स्ट्पेु इडीुी‍-‍बाह्य‍जाकाु‍िुल्क इडीएमुी‍-‍पूाी‍ददल्ली‍नगर‍जनगम इअइए‍-‍पयावारणीय‍प्रभाा‍अकलन इओडीबी – इज‍ऑफ‍डूआंग‍जबजनेु इएुजेड‍-‍आकज-ुेंजुरटा‍जजन इएुएु-‍आलेजक्रक‍ुब‍स्ट्टेिन[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 293 इडब्ल्यूएु- अर्नथक‍रूप‍ुे‍कमजजर‍ाग व इाी‍-‍आलेजक्रक‍ााून इडब्ल्यूएु‍-‍अर्नथक‍रूप‍ु‍ेकमजजर‍ाग व एफ एफएअर‍–तल‍क्षत्रे फल‍ऄनुपात एफडीअइ‍-‍जादेिी‍प्रत्यक्ष‍जनाेि एफओबी‍-‍फुट‍ओार‍जब्रज एफटीटीएच‍-‍फाआबर-टू-द-ूजम जी जीबीएफ - ग्रीन-ब्लू‍फ,क्टर जीडीए‍-‍ग्रीन‍डेालपमेंट‍एररया जीडीपी‍-‍ुकल‍घरेलू‍ईत्पाद जीइअर - ुकल‍नामांकन‍दर जीएचजी‍-‍ग्रीनूाईु‍ग,ु जीअइएु‍-‍भौगजजलक‍ुूचना‍प्रणाली जीएनुीटीडी - राष्ट्रीय‍राजधानी‍क्षेत्र‍ददल्ली‍ुरकार जीपीुीडी‍-‍ग,लन‍प्रजत‍्जि ‍प्रजत‍ददन जीपीअरए - ुामान्य‍पूल‍ररूायिी‍अााु जीअरअइएचए - एकीकृत‍अााु‍अकलन‍के‍जलए‍ग्रीन‍रेरटग जीएुएम‍-‍मजबाआल‍ुंचार‍के‍जलए‍ा,जिक‍प्रणाली जीाीए - ुकल‍मूल्य‍जजड़ा‍गया एच एचुीुी‍–‍धरजूर‍ुंरक्षण‍ुजमजत एचुीाी‍-‍भारी‍ााजणजज्यक‍ााून एचडीअइ‍-‍माना‍जाकाु‍ुूचकांक एचएच - घरेल ू एचटी – ूाइ‍टेंिन अइ अइुीडी‍-‍ऄंतदेिीय‍कंटेनर‍जडपज अइुीटी‍-‍ुूचना‍और‍ुंचार‍प्रौद्यजजगकी अइुीाी – आंटरमीजडएट‍कमर्नियल‍व्ूीकल अइइुी-‍ुूचना‍जिक्षा‍और‍ुचं ार अइ‍एडं ‍एफुी - लुचाइ‍और‍बाढ़‍जनयंत्रण‍जाभाग अइएफुी - आंटीग्रेटेड‍फ्रेट‍कॉम्प्लेक्ु अइजीपी‍-‍एकीकृत‍जीडीए‍यजजना अइजीबीुी- भारतीय‍ूररत‍भान‍पररीद अइअइए - औद्यजजगक‍ुुधार‍क्षेत्र अइएनटीएुीएच - आंजडयन‍निे नल‍रस्ट्ट‍फॉर‍अटव‍एडं ‍कल्चरल‍ूरे रटेज अइपीटी‍-‍आंटरमीजडएट‍पजब्लक‍रांुपजटव‍294 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] अइअरुी‍-‍आंजडयन‍रजड‍काग्रं ुे अइएुबीटी - आंटर‍स्ट्टेट‍बु‍टर्नमनल अइटी‍-‍ुूचना‍प्रौद्यजजगकी अइएुबीटी - आंटर‍स्ट्टेट‍बु‍टर्नमनल अइटीइएु‍-‍ुूचना‍प्रौद्यजजगकी‍ुक्षम‍ुेााएं अइटीअइ‍-‍औद्यजजगक‍प्रजिक्षण‍ुंस्ट्थान अइटीएमएु - आंटेजलजेंट‍रांुपजटव‍म,नेजमेंट‍जुस्ट्टम ज े जेजे‍क्लस्ट्टर‍-‍झुग्गी‍झजपड़ी‍क्लस्ट्टर के केबीअइ‍-‍ज्ञान‍अधाररत‍ईद्यजग केपीअइ - मुख्य‍प्रदिवन‍ुंकेतक एल एलबीजेड - लुरटयंु‍बंग्लज‍जजन एुीए - जीान‍चक्र‍जाश्लेीण एलुीाी‍-‍लाआट‍कमर्नियल‍व्ूीकल एलडीुी‍–‍लाआाेबल‍ददल्ली‍ुजमजत एल‍एडं ‍डीओ‍-‍भूजम‍और‍जाकाु‍कायावलय एलडीअरए - लज-डेंजुटी‍अााुीय‍क्षेत्र एलडीअरपी - कम‍घनत्ा‍ााला‍अााुीय‍भूखंड‍(लज-डेंजुटी‍रेजुडेंजुयल‍प्लॉट) एलइइडी- उजाव‍और‍पयावारण‍जडजाआन‍म‍ेंनेतृत्ा एलअइजी - जनम्न‍अय‍ाग व एलओएु - ुेाा‍का‍स्ट्तर एलपीुीडी‍-‍प्रजत‍ददन‍लीटर‍प्रजत‍्जि एलपीजी‍-‍द्रजात‍पेरजजलयम‍गु, एलपीअर - श्रम‍भागीदारी‍दर एलअरटी - लाआट‍रेल‍रांजजट एलएुुी‍-‍स्ट्थानीय‍िॉलपग‍ुेंटर एम एमुीुी‍-‍मेरजपॉजलटन‍जुटी‍ुेंटर एमुीडी‍-‍ददल्ली‍नगर‍जनगम एमुीाी – मीजडयम‍कमर्नियल‍व्ूीकल एमडीअर‍-‍मजजबजलटी‍डेटा‍ररपॉजजटरी एम‍एंड‍इ‍-‍जनगरानी‍और‍मल्ू यांकन एमओइएफ और‍ुीुी- पयावारण,‍ान‍और‍जलाायु‍पररातवन‍मंत्रालय एमइएु‍-‍ु,न्य‍आंजीजनयर‍ुेााएं एमएफए‍-‍ुामग्री‍प्रााू‍जाश्लीे ण एमजीडी‍-‍प्रजतददन‍लाखों‍ग,लन एमअइुीइ - ब,ठकें, प्रजत्ुाून, ुम्मेलन‍और‍प्रदिवजनया ाँ[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 295 एमअइजी - म्यम‍अय‍ुमूू एमएलुीपी - मल्टी-लेाल‍कार‍पार्ककग एमएमअइ - मल्टी-मजडल‍आंटीग्रेिन एमएमएुुीएमडी‍-‍जमजलयन‍मीररक‍मानक‍क्यूजबक‍मीटर‍प्रजत‍ददन एमएमटीएच - मल्टी-मजडल‍राुं पजटव‍ूब एमओएचयूए - अााुन‍और‍िूरी‍काय‍व मंत्रालय एमपीडी‍–‍ददल्ली‍ एमअरएफ‍-‍ुामग्री‍ाुूली‍ुुजाधाएं एमअरटीएु‍-‍माु‍र,जपड‍रांजजट‍जुस्ट्टम एमएुएमइ - माआक्रज‍स्ट्मॉल‍मीजडयम‍एंटरप्राआज एमएुडब्ल्य ू- नगरपाजलका‍ठजु‍ऄपजिष्ट एमटीए‍-‍माकेट‍रेडुव‍एुजजुएिन एमटीएनएल‍-‍मूानगर‍टेलीफजन‍जनगम‍जलजमटेड एमयू‍-‍मेगा‍यूजनट एमयूजेड - बुए-ईपयजजगता‍क्षेत्र एमडब्ल्य‍ू-‍मगे ाााट एम‍एंड‍डब्ल्यूुी‍-‍मेजडजुन‍और‍ाॉक-आन‍जक्लजनक एन एनबीुी-‍नेिनल‍जबलल्डग‍कजड एनुीअर - राष्ट्रीय‍राजधानी‍क्षत्रे एनुीअरपीबी - राष्ट्रीय‍राजधानी‍क्षेत्र‍यजजना‍बजड व एनुीटीडी‍-‍राष्ट्रीय‍राजधानी‍क्षेत्र,‍ददल्ली एनुीजेड - प्राकृजतक‍ुंरक्षण‍क्षेत्र एनडीएमुी‍-‍नइ‍ददल्ली‍नगर‍जनगम एनएफएचएु‍-‍राष्ट्रीय‍परराार‍स्ट्ाास्ट््य‍ुाेक्षण एनजीओ‍-‍ग,र-ुरकारी‍ुंगठन एनएचएअइ - भारतीय‍राष्ट्रीय‍राजमाग‍वप्राजधकरण एनएचुी‍-‍ग,र-पदानुक्रजमत‍ााजणजज्यक‍केंद्र एनएचुीुी‍-‍गर, -पदानुक्रजमत‍ााजणजज्यक‍केंद्र एनएमए- राष्ट्रीय‍स्ट्मारक‍प्राजधकरण एनएमटी - ग,र-मजटर‍चाजलत‍परराून एनएमाी- ग,र-मजटर‍चाजलत‍ााून एनओुी‍-‍ऄनापजि‍प्रमाण‍पत्र एनअर-‍कजइ‍प्रजतबंध‍नूीं एनअरइपी‍-‍राष्ट्रीय‍ुंुाधन‍क्षमता‍नीजत एनअरडब्ल्यू‍–‍नॉन‍रेाेन्य‍ूााटर एनटीइ - नाआट‍टाआम‍आकजनॉमी ओ ओ-डी‍-‍मलू ‍गंत्‍(ओररजजन‍डेस्ट्टीनेिन) ओएंडएम‍-‍ुंचालन‍और‍रखरखाा296 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] पी पीबीएु‍-‍ुाावजजनक‍ुाआदकल‍िेयररग पीडीएु‍-‍ुाावजजनक‍जातरण‍प्रणाली पीएचपीडीटी - पीक‍ऑार‍पीक‍डायरेक्िन‍(ददिा)‍र,दफक पीअइएु‍-‍यात्री‍ुूचना‍प्रणाली पीएलएफएु‍-‍अाजधक‍श्रम‍बल‍ुाेक्षण पीएम - पार्टटकुलेट‍म,टर पीएमडी‍-‍पार्ककग‍प्रबंधन‍जडजस्ट्रक पीएमडीएमयू‍-‍यजजना‍जनगरानी‍और‍डेटाबेु‍प्रबंधन‍आकाइ पीएमडीपी‍-‍पार्ककग‍प्रबंधन‍जडजस्ट्रक‍यजजना पीएमकेाीााइ – प्रधानमंत्री‍कौिल‍जाकाु‍यजजना पीएम-यूडीएाइ - ददल्ली‍में‍ऄनजधकृत‍कॉलजजनयों‍के‍जलए‍प्रधानमंत्री‍अााु‍ऄजधकार‍यजजना पीएमाी‍-‍्जि गत‍मजटर‍ााून पीओपीएु - जनजी‍स्ट्ााजमत्ा‍ााले‍ुाावजजनक‍स्ट्थल पीपीपी‍–‍ुाावजजनक‍जनजी‍भागीदारी‍(पजब्लक‍प्राआाेट‍पाटवनरजिप) पीएुपी - ुाावजजनक‍और‍ऄध-व ुाावजजनक पीटी‍-‍ुाावजजनक‍परराून पीटीएएल‍-‍ुाावजजनक‍परराून‍पुएचाँ ‍स्ट्तर पीयूएचुी - प्राथजमक‍िूरी‍स्ट्ाास्ट््य‍केंद्र पीाी-‍यात्री‍ााून पीडब्ल्यडू ी‍-‍दद्ांग‍्जि ुीपीडब्ल्यूडी - केंद्रीय‍लजक‍जनमावण‍जाभाग अर अरएडं डी-‍ऄनुुंधान‍और‍जाकाु अरएफअइडी‍-‍रेजडयज-अाृजि‍पूचान‍(रेजडयज‍फ्रीक्वेंुी‍अआडेंरटदफकेिन) अरओडब्ल्य-ू मागावजधकार‍(राआट‍ऑफ‍ाे) अरओबी‍-‍रजड‍ओार‍जब्रज अरयूबी‍-‍रेलाे‍ऄडं र‍जब्रज अरअरटीएु‍-‍क्षेत्रीय‍रेल‍परराून‍प्रणाली अरअरटीएु‍-‍क्षेत्रीय तीव्र पारगमन प्रणाली (अर.अर.टी.एु.) अरटीाी‍-‍र,जपड‍रांजजट‍ााून अरडब्ल्यूए‍-‍रेजजडेंट‍ाले फेयर‍एुजजुएिन एु एुुीएडीए‍- पयवाेक्षी‍जनयंत्रण‍और‍डेटा‍ऄजधग्रूण एुडीुी‍-‍स्ट्थायी‍ददल्ली‍ुजमजत एुडीजी‍-‍ुतत‍जाकाु‍लक्ष्य एुडीएमुी‍-‍दजक्षणी‍ददल्ली‍नगर‍जनगम एुइजेड‍-‍जािेी‍अर्नथक‍क्षेत्र एुएमइ‍-‍लघु‍और‍म्यम‍स्ट्तर‍के‍ईद्यम एुपीए‍-‍ुेाा‍प्रदाता‍एजेंजुयां एुपीाी‍-‍जािेी‍प्रयजजन‍ााून एुअरडीुी - िाूजूानाबाद‍पुनर्नाकाु‍जनगम[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 297 एुअरएु‍-‍ुैंपल‍रजजस्ट्रेिन‍जुस्ट्टम एुटीपी‍-‍ुीारेज‍रीटमेंट‍प्लांट एुयूएु - स्ट्थायी‍िूरी‍ुेााएाँ एुडब्ल्यूएम‍–‍ठजु‍ऄपजिष्ट‍प्रबंधन‍(ुॉजलड‍ाेस्ट्ट‍म,नेजमेंट) एुडब्ल्यओू टी‍–‍िजि यों,‍कमजजररयों,‍ऄाुरों‍और‍खतरे टी टीडीअर‍-‍ूस्ट्तांतरणीय‍जाकाु‍ऄजधकार टीइअरअइ - उजाव‍और‍ुंुाधन‍ुंस्ट्थान टीओडी - पारगमन-ईन्मुख‍जाकाु (रांजजट‍ओररएजन्टड‍डेालपमेंट) टीओअर – जाचाराथव‍जाीय‍(टमुव‍ऑफ‍रेफरेंु) टीपीडी‍-‍टन‍प्रजत‍ददन य ू यूबीबीएल‍-‍यूजनफाआड‍जबलल्डग‍बाय‍लॉज यूुी‍-‍ऄनजधकृत‍कॉलजजनयां यूइअर‍-‍िूरी‍जास्ट्तार‍ुड़कें यूजीअर - ऄंडर‍ग्राईंड‍जलािय यूएलबी - िूरी‍स्ट्थानीय‍जनकाय यूएमटीए - एकीकृत‍मूानगरीय‍परराून‍प्राजधकरण यूअरडीपीएफअइ - िूरी‍और‍क्षेत्रीय‍जाकाु‍यजजना‍जनमावण‍और‍कायावन्ायन यूटी-‍केंद्र‍िाजुत‍प्रदेि यूटीएफ - िूरी‍परराून‍कजी यूटीटीअइपीइएफ - एकीकृत‍यातायात‍और‍परराून‍ऄाुंरचना‍(यजजना‍और‍आंजीजनयररग)‍केंद्र ाी ाीडीुी‍-‍ााआब्रेंट‍ददल्ली‍कमेटी ाीजीएफ‍-‍्ाूायवता‍ऄंतर‍जािपजीण डब्ल्य ू 2डब्ल्यएू - दज‍पजूया‍ााून 3डब्ल्यएू - तीन‍पजूया‍ााून 4डब्ल्यएू - चार‍पजूया‍ााून/पीाी‍(कारें) डब्ल्यूएचओ‍-‍जाि‍स्ट्ाास्ट््य‍ुगं ठन डब्ल्यएू ुयडू ी - ााटर‍ुेंजुरटा‍ऄबवन‍जडज़ाआन डब्ल्यटू ीपी - जल‍िजधन‍ुंयंत्र जडे जेडडीपी – क्षेत्रीय‍जाकाु‍यजजना जेड- फार्ममग‍-‍जीरज‍एकड़‍फार्ममग जेडडब्ल्यएू ल - जीरज‍ाेस्ट्ट‍लजकेजलटीज298 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] िब्दााली ए ुदक्रय‍फ्रंटेज‍(एजक्टा‍फ्रंटेज) दकुी‍ुड़क‍का‍ऐुा‍जूस्ट्ु‍ ा‍जूााँ‍ुड़क‍और‍भान‍के‍बीच‍दश्ृ यमान/भौजतक‍पारगम्यता‍ुे‍एक‍ुदक्रय‍जुड़ाा‍ू।, ‍ुदक्रय‍ फ्रंटेज‍म,ें‍भान‍का‍ऄग्र‍भाग‍ुड़क‍की‍ऄजभमुख‍ूजता‍ू‍, और‍ुाावजजनक‍गजतजाजध‍ज,ुे‍दक‍खुदरा‍या‍मनजरंजक‍ गजतजाजधयों‍की‍ुुजाधाएं‍प्रदान‍करता‍ू।, ‍आुु‍े ुाावजजनक‍ुड़क‍पर‍पद, ल‍चलन‍े की‍गजतजाजधयां‍और‍जनजष्क्रय‍जनगरानी‍ बढ़ती‍ू।, ुदक्रय‍यात्रा परराून‍का‍एक‍ुाधन‍जजुमें‍ज,ुे‍एक‍गतं ्‍ु‍े दुू रे‍गंत्‍तक‍जाने‍के‍जलए‍िारीररक‍गजतजाजध‍ज,ुेदक‍प,दल‍चलना‍ और‍ुाआदकल‍चलाना‍िाजमल‍ूज। ुदक्रय‍यात्रा‍क्षत्रे ‍(एटीए) एनएमटी‍गजलयों‍के‍घनत्‍ा‍म‍ें ुुधार‍कर‍और/ऄथाा‍ईु‍क्षत्रे ‍में‍मौजूदा‍नेटाकव‍की‍रेरजदफरटग‍करके‍ुदक्रय‍यात्रा‍कज‍ बढ़ााा‍देने‍के‍जलए‍पूचाना‍गया‍ईपक्षेत्र /‍क्षेत्र। ऄनकु ूलक‍पनु :‍ईपयजग यू‍ऄनुमेय‍और‍ुंगत‍ईपयजगों‍कज‍ुमायजजजत‍करन‍े के‍जलए‍एक‍ुूचीबद्ध‍मौजूदा‍भानों‍‍के‍पुन:‍ईपयजग‍की‍प्रदक्रया‍ू।, ‍ ऐजतूाजुक‍भानों‍में‍ऄनुकूल‍पनु :‍पुन:‍ईपयजग‍ुे‍लंब‍े ुमय‍तक‍ईपयजगी‍जीान‍के‍ुाथ-ुाथ‍ुौंदयवपरक‍और‍ ऐजतूाजुक‍मूल्यों‍कज‍बनाए‍रखा‍जा‍ुकता‍ू।, ‍भान‍का‍पुन:‍ईपयजग‍और‍ईुमें‍ऄनुमेय‍पररातवन‍यूबीबीएल‍2016‍म‍ें ददए‍गए‍ग्रडे ‍प्रााधानों‍के‍ऄनुुार‍ूजगा। दकराय‍ेकी‍ाूनीय‍अााु‍आकाआया ाँ ऄाजध‍(टेन्यजर)-अधाररत‍अााुीय‍आकाआयों‍में‍दकराये‍की‍ाूनीय‍ररूायिी‍आकाइयां‍और‍दकराए‍पर‍ियनगृू‍अती‍ू‍ैं ज,ुादक‍ुरकार‍द्वारा‍जनधावररत‍दकया‍गया‍ू।, ुभी‍के‍ईपयजग‍यजग्य‍पाकव मनजरंजन‍ुुजाधाओं/गजतजाजधयों‍के‍ुाथ‍बनाए‍गए‍पाकव‍जजुुे‍ये‍ुभी‍क्षमताओं‍और‍अयु‍ुमूूों‍के‍ईपयजगकतावओं‍के‍ जलए‍ुमााेिी‍बन‍जात‍े ू ैं एमेन्टीज़‍एफएअर एमेन्टीज़‍एफएअर,‍पुनरूद्धार‍की‍प्रदक्रया‍के‍रूप‍म‍ें ऄजनयजजजत‍क्षेत्रों‍में‍ऄजतररि ‍ुामाजजक‍ुुख-ुुजाधाओं‍(एमेंटीज़)‍का‍ प्रााधान‍करन‍े के‍जलए‍एक‍प्रकार‍का‍आंुेंरटा‍एफएअर‍(ऄनुमये ‍एफएअर‍ुे‍ऄजधक)‍ू।, ‍‍ परु ातत्ा‍पाकव एक‍स्ट्थाजनक‍ुजन्नजूत‍क्षेत्र,‍जजुमें‍पाररजस्ट्थजतक‍ुंपजि‍के‍ुाथ‍धरजूर‍मूत्‍ा‍की‍ुंपजि‍भी‍जड़ु ी‍ूज।‍ऐु‍े पाकों‍म‍ें पयवटकों‍के‍अकीणव ‍के‍ऄजतररक्त‍ ‍जनता‍के‍जलए‍एक‍्ाख्यात्मक‍और‍ि,जक्षक‍ुंुाधन‍बनन‍ेकी‍क्षमता‍ू।, ुूायता‍प्राप्त‍खरीद‍आकाइया ाँ ऄाजध‍(टेन्यजर)-अधाररत‍ररूायिी‍आकाइयों‍में,‍दकराये‍ुे‍स्ट्‍ााजमत्‍ा‍(रेन्ट‍टू‍ओन)‍मॉडल‍आकाआयां‍िाजमल‍ूजती‍ू‍ैं जूा‍ं दकरायजदार‍के‍पाु‍पूा-व जनधावररत‍ऄाजध‍के‍ऄंत‍में‍आकाइ‍की‍खरीद‍का‍जाकल्‍प‍के‍ुाथ‍ईुे‍ाार्नीक‍एकमुश्त‍राजि‍कज‍ ऄजनाायव‍रूप‍ुे‍ऄलग‍रखना‍ूजता‍ू।,[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 299 बी जा, -जल‍जनकाुी (बायज‍ड्रेनजे ) ज,ा-जल‍जनकाुी‍या‍ज,जाक‍जल‍जनकाुी,‍पौधों‍द्वारा‍ााष्पीकरण‍के‍मा्यम‍ुे‍ऄजतररि ‍मृदा‍जल‍कज‍ूटाता‍ू,, जज‍ पौधों‍की‍प्रजाजतयों,‍ाृक्षारजपण‍घनत्ा,‍जल‍स्ट्तर‍की‍गूराइ‍और‍जलाायु‍पर‍जनभवर‍करता‍ू।, बायज-स्ट्ाले ाीावजल‍कज‍बूते‍ुएए‍रजकन,े‍ुंुाजधत‍करने‍और‍जमीन‍में‍ाापु‍प्रजाष्ट‍‍कराने‍के‍जलए‍ानस्ट्‍पजत‍ुे‍ढका,‍ईथल‍भूदश्ृ ‍य‍ गड्ढ‍ेके‍तौर‍पर‍बनायी‍गइ‍ूररत‍ऄाुंरचना‍ुुजाधा। नीली‍ुपं जि (ब्ल‍ूएुटे ) पाररजस्ट्थजतक‍जािेीताएं‍ज,ुे‍यमुना‍नदी‍और‍अद्रभव ूजम, तालाब, झील, प्राकृजतक‍नालें‍और‍माना‍जनर्नमत‍ुुजाधाएं‍ज,ु‍े नूरें, बााली,‍कुएं‍अदद। ब्राईनफील्ड‍क्षत्रे िूर‍का‍मौजूदा‍जनर्नमत‍क्षेत्र। ्ापार‍ुां धनव ‍जजल‍े(बीपीडी) बीपीडी‍क्षेत्र‍म‍ें जाजिष्ट‍मौजूदा‍औद्यजजगक‍क्षेत्र, जजला‍केंद्र‍और‍ुंस्ट्थागत‍क्षेत्र‍अदद‍िाजमल‍ू‍ैं ज,ुा‍दक‍यजजना‍म‍ें पूचान‍ की‍गइ‍ू।, ुी केनजपी‍डेनजुटी दकुी‍क्षेत्र‍का‍ऄनुपात‍जज‍ाृक्षों‍ुे‍ढका‍ूज‍और‍कुल‍क्षेत्रफल‍के‍प्रजतित‍में‍्ि ‍दकया‍गया‍ूज। क,ररजा े मजटर‍और‍मजटर‍रजूत‍ााूनों‍की‍अााजाूी‍के‍जलए‍अरजक्षत‍स्ट्थान। ुकुवलर‍आकजनजमी अर्नथक‍मॉडल,‍जजुमें‍ुंुाधनों‍कज‍यथाुंभा‍लंबे‍ुमय‍तक‍ईपयजग‍में‍रखा‍जाता‍ू‍, ‍तादक‍मूल्य‍ऄजधकतम‍ूज‍और‍ ऄपजिष्ट‍‍म‍ें कमी‍अए।‍यू‍'मेक, यूज़, जडस्ट्पजज़' के‍पारंपररक‍रेखीय‍अर्नथक‍मॉडल‍का‍एक‍जाकल्प‍ू‍,और‍आुम‍ें पुनचक्रण‍ और‍मरम्मत‍ऄथव्ास्ट्थाए,ाँ ऄपजिष्ट‍जल‍के‍पुन:‍ईपयजग, पनु चवदक्रत‍ुीएंडडी‍ऄपजिष्ट‍ईत्पाद‍और‍जनमावण‍ुामग्री‍(ज,ु‍े फ्लाइ‍ऐि‍ुे‍जनर्नमत‍ईंटें,‍मरम्‍मत‍दकया‍गया‍ऐस्ट्फाल्ट‍पेामेंट‍अदद)‍मल‍कीचड़‍का‍पनु चक्रमण अदद‍िाजमल‍ू।ैं िूरी‍स्ट्तर‍के‍ुर्दकट ुांस्ट्कृजतक‍और‍/‍या‍रचनात्मक‍ऄथव्ास्ट्थाओं‍की‍ुुगमता‍के‍जलए‍ईन्‍नत‍ुुख-ुुजाधाओं/‍ुुजाधाओं‍ुे‍ुमर्नथत‍एक‍ ुुरजक्षत‍और‍जीांत‍नागररक‍ुमाज/‍ुामाजजक‍्ाूार‍कज‍ुंपजजीत‍करने‍के‍जलए‍ुाावजजनक‍स्ट्थान‍नेटाकव,‍जजुके‍ुाथ‍ कभी-कभी‍थीम‍कायवक्रम‍अदद‍ूजते‍ू।ैं स्ट्ाच्छ‍ऄथ्व ास्ट्था‍/‍ईद्यजग ग,र-प्रदीू णकारी‍ और‍ पयावारण-ऄनुकूल‍ ऄथव्ास्ट्थाएं/ईद्यजग‍ ज,ु‍े ज्ञान‍ और‍ ुाआबर‍ ऄथव्ास्ट्थाएं, ुांस्ट्कृजतक‍ और‍ रचनात्मक‍ऄथव्ास्ट्थाए,ं ूररत‍ऄथव्ास्ट्थाएं, ुकुवलर‍आकजनजमी‍अदद, जजनका‍ूाा‍और‍पानी‍की‍गणु ािा‍पर‍कम‍ प्रभाा‍पड़ता‍ू,,‍ऄपजिष्ट‍का‍प्रबंधन‍करती‍ू‍ैं और‍आुके‍जने रेिन‍में‍कमी‍लाती‍ू‍ैं और‍ुाथ‍ूी‍राुायजनक‍जजजखम‍कम‍ करती‍ू।ैं300 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ााजणजज्यक‍केंद्र ये‍प्रमुख‍्ापार‍रेड‍और‍ााजणज्य‍और‍िॉलपग‍केंद्र‍ू‍ैं जज‍बुए-मॉडल‍गजतजाजधयों‍के‍रूप‍में‍ुेााएं‍प्रदान‍करत‍े ू।ैं ‍आुम‍ें मूानगरीय‍जुटी‍ुेंटर,‍जजला‍केंद्र,‍ुामुदाजयक‍केंद्र,‍स्ट्‍थानीय‍िॉलपग‍ुेंटर, ुुजाधा‍िॉलपग‍ुेंटर‍और‍नॉन-ूायराररकल‍ कमर्नियल‍ुेंटर, थजक‍जबक्री‍और‍भंडारगृू‍(ाेयरूाईलुग)‍िाजमल‍ू।ैं ्ापक‍मजजबजलटी‍यजजना‍(ुीएमपी) यू‍यजजना‍म‍ें दकुी‍िूर‍के‍जलए‍ाांछनीय‍मजजबजलटी‍प,टन‍व (लजग‍और‍ास्ट्तुए)ं ‍का‍दीघवकाजलक‍जाजन‍प्रस्ट्ततु ‍करती‍ू‍ैं और‍आु‍जाजन‍कज‍प्राप्त‍करने‍के‍जलए‍कायवनीजतक‍और‍नीजतगत‍ईपाय‍ईपलब्‍ध‍कराती‍ू।ैं कंजिे न‍प्राआलजग िूर‍के‍दकुी‍जनधावररत‍क्षेत्र‍म‍ें प्राेि‍करन‍े ााल‍े ााूनों‍पर‍लगाया‍जान‍े ााला‍िल्ु क‍तादक‍ईन‍क्षेत्रों‍म‍ें ााूनों‍की‍ुंख्या‍ और‍कंजेिन‍का‍स्ट्तर‍कम‍दकया‍जा‍ुके। कंुजर्टटयम एक‍ जाजधात‍ पंजीकृत‍ एुजजुएिन‍ जजुके‍ पाु‍ जाजध‍ के‍ ऄनुुार‍ऄजधकार, कतव्‍और‍ दाजयत्ा‍ ूों,‍ जजुमें‍ कइ‍ भूस्ट्‍ाामी/डेालपर‍ुगं ठन‍िाजमल‍ूजत‍े ू‍ैं जज‍जनधावररत‍मानदंडों‍और‍ददिाजनदेिों‍के‍ऄनुुार‍जाकाु‍के‍जलए‍भूजम‍का‍पलू ‍ करने‍के‍जलए‍एक‍ुाथ‍अगे‍अते‍ू।ैं पररातनव ‍प्रभार (कनाज़नव ‍प्रभार) ये‍ुरकार‍द्वारा‍ुमय-ुमय‍पर‍जनधावररत‍दकए‍गए‍िुल्क‍ू‍ैं जज‍जाजध‍के‍ऄनुुार‍ऄनुमत‍लाइुेंु‍िल्ु ‍क‍के‍ऄजतररक्त‍ ‍ भूजम/गजतजाजध‍के‍ईपयजग‍म‍ेंपररातवन‍करने‍पर‍देय‍ूजत‍े ू।ैं कम्पलीट‍स्ट्रीट आु‍प्रकार‍बनाइ‍गइ‍और‍्ाजस्ट्थत‍ुड़कें‍जजन‍पर‍ऄन्‍य‍ईपयजगकतावओं‍की‍ऄपेक्षा‍प,दल‍याजत्रयों‍और‍ुाआदकल‍चालकों‍ कज‍प्राथजमकता‍दी‍जाती‍ूज‍और‍ुभी‍ईम्र‍और‍क्षमताओं‍ााले‍लजगों‍ुजूत‍ुभी‍ईपयजगकतावओं‍के‍जलए‍ुुरजक्षत‍ अााजाूी‍कज‍ुक्षम‍बना‍ुके। ुास्ट्ं कृजतक‍और‍रचनात्मक‍ऄथ्व ास्ट्था पयवटन, जडजाआन‍और‍फ,िन, प्रकािन, एफ‍एंड‍बी, मीजडया, दश्ृ य‍/‍प्रदिनव ‍कला‍अदद‍ज,ुे‍ईद्यजगों‍पर‍अधाररत‍ ऄथव्ास्ट्था। ुास्ट्ं कृजतक‍ूॉटस्ट्पॉट ऄत्य‍ जधक‍जन-गजतजाजध,‍स्ट्थान‍की‍पूचान, या‍ऐजतूाजुक, ुांस्ट्कृजतक‍या‍दकुी‍ऄन्य‍मूत्ा‍के‍कारण‍स्ट्थानीय‍और‍ पयवटकों‍कज‍अकजीत‍करन‍े ााले‍स्ट्‍थान। ुास्ट्ं कृजतक‍ईपक्षत्रे एक‍क्षत्रे ‍के‍भीतर‍ऄलग-ऄलग‍और‍ग,र-ुजन्नजूत‍धरजूर‍स्ट्थलों‍और/या‍ुामाजजक-ुांस्ट्कृजतक‍मूत्ा‍के‍भानों‍का‍ुमूू ‍ जज‍ुड़कों‍या‍ुड़क‍नेटाकव‍द्वारा‍एक‍दुू रे‍ुे‍जुड़े‍ूों‍जजुुे‍एक‍ुंुक्त‍ ‍ुांस्ट्कृजतक‍ूॉटस्ट्पॉट‍बनता‍ूज। ुास्ट्ं कृजतक‍ुुं ाधन‍प्रबधं न‍यजजना‍(ुीअरएमपी) यू‍प्रत्येक‍ुांस्ट्कृजतक‍ईपक्षेत्र‍के‍जलए‍त,यार‍की‍जाने‍ााली‍यजजना‍ू,‍जजुम‍ें िूरी‍जडजाआन‍और‍जनर्नमत‍फॉम‍व जनयंत्रण‍ िाजमल‍ू।ैं ुाआलक्लग‍राजमाग व लंबी‍दरू ी‍की‍ुदक्रय‍यात्रा‍कज‍ुुजाधाजनक‍बनान‍े के‍जलए‍ुभी‍अाश्यक‍ऄाुंरचना‍युक्त‍ ‍पूचान‍े गए‍और‍जाकजुत‍ ुमर्नपत‍ुाआलक्लग‍कॉररडजर।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 301 डी जाकाुकता‍वुस्ट्ं था‍(डाे लपर‍एनरटटी)‍(डीइ) एकल‍भूजम/‍ुंपजि‍स्ट्‍ाामी‍ऄथाा‍भूजम‍/‍ुंपजि‍स्ट्‍ााजमयों‍का‍एक‍ुमूू, जजन्ूोंने‍डालपमेंट‍/‍पुनरूद्धार‍के‍जलए‍एक‍या‍ एकाजधक‍भूखण्‍डों‍का‍पलू ‍बनाया‍ूज। इ आकज-ुास्ट्ं कृजतक‍ुपं जि ऐुी‍ुुजाधाएाँ‍जूााँ‍दकुी‍पररदश्ृ य‍के‍पाररजस्ट्थजतक‍और‍ुांस्ट्कृजतक‍दजनों‍पूलओंु ‍कज‍जजड़ा‍गया‍ूज,‍ज,ुे‍दक‍ओपन‍ग्रील‍ ााले‍ुंरजक्षत‍स्ट्मारक‍और‍धरजूर‍भान,‍बगीचे,‍जनर्नमत‍जल‍प्रणाजलयां‍ज,ुे‍टैंक,‍कुएं‍(बााली)‍अदद। ऄथ्व ास्ट्था‍के‍माग व िूर‍म‍ेंुमर्नपत‍ईच्च‍फ्रीक्वेंुी‍लज-फेयर‍माु‍रांजजट‍रूट‍। ऄजधभार कजइ‍भी‍कानूनी‍या‍भौजतक‍बाधा‍जजुुे‍दकुी‍ुंपजि‍की‍ूस्ट्तांतरणीयता‍पर‍प्रजतकूल‍प्रभाा‍पड़‍ुकता‍ूज‍और‍आुका‍ मुक्‍त‍ईपयजग‍तब‍तक‍प्रजतबंजधत‍ूजगा‍जब‍तक‍आुका‍ऄजधकार‍न‍ूट‍जाए। खाली‍स्ट्थान (एन्कम्ब्रुें ) अकाि‍के‍नीच‍े खुल‍े क्षेत्र,‍जूां‍लजग‍अग, भूकंप‍अदद‍ज,ुी‍दकुी‍घटना‍के‍ुमय‍एकत्र‍ूज‍ुकें।‍ये‍पाकव, बुएईद्देश्यीय‍ म,दान, ऄन्य‍खलु ‍ेस्ट्थान‍अदद‍ूज‍ुकते‍ू‍ैंजज‍जनााजुयों‍की‍ुूज‍पुएचं ‍म‍ेंूज। अर्नथक‍रूप‍ु‍ेकमजजर‍ाग‍व(इडब्ल्‍य‍ एू ु) इडब्ल्यूएु‍परराार‍कज‍ऐु‍े परराार‍के‍रूप‍में‍पररभाजीत‍दकया‍गया‍ू‍, जजनकी‍ाार्नीक‍अय‍आु‍श्रेणी‍में‍पात्रता‍प्राप्त‍ करने‍के‍जलए‍ुरकार‍द्वारा‍ुमय-ुमय‍पर‍यथाः‍जनधावररत‍ूज। एक्ुप्रुे ‍माग व ूाइ‍फुटफॉल‍माु‍रांजजट‍स्ट्टेिनों‍/‍गंत्ों‍कज‍जजड़ने‍ााले‍मागव‍तादक‍यात्रा‍के‍दौरान‍स्ट्टॉप‍/‍ूाल्ट‍स्ट्टेिनों‍की‍ुंख्या‍कम‍ ुे‍कम‍ूज‍और‍यात्रा‍का‍ुमय‍ऄनुकूजलत‍ूज।‍देखें‍एमओबी2,‍खंड‍4.4‍ बाह्य‍जाकाु‍िल्ु क‍(इडीुी) डीइ‍/‍कंुजर्टटयम‍द्वारा‍रंक‍पजब्लक‍आन्फ्रास्ट्रक्चर‍और‍ुेााओं‍के‍जनमावण,‍जबछान‍े और‍स्ट्थाजपत‍करन‍े की‍लागत‍के‍जलए‍ चुकाए‍गए‍प्रभार‍ूजत‍े ू‍ैं जजनमें‍ऄन्‍य‍बातों‍के‍ुाथ-ुाथ‍ुड़कें,‍जलापूर्नत,‍ुीारेज‍और‍जलजनकाुी‍प्रणाजलया,ं‍जाद्युत‍ अपूर्नत,‍ूररयाली‍अदद‍िाजमल‍ूैं। एफ फस्ट्टव‍माआल‍कनजे क्टजाटी‍ फस्ट्टव‍माआल‍कनेजक्टजाटी‍ुे‍लजगों‍कज‍दकुी‍भी‍ुाावजजनक‍राुं पजटेिन‍ूब‍ररप‍ज,ुे‍रेलाे‍स्ट्टेिन, बु‍स्ट्टैंड/जडपज‍या‍मेरज‍ स्ट्टेिन‍अदद‍के‍अरंभ‍स्ट्‍थल‍ु‍ेलेना‍ऄजभप्रेत‍ू।, बाढ़‍कज‍रजकन‍े(फ्लड‍जडटेनिन)‍ूते ‍ुलुक‍/‍ररटेंिन‍लुक बाढ़‍के‍पानी‍कज‍रजकन/े‍भंडाररत‍करन‍े के‍जलए‍प्रयुक्‍त‍ाीाजव ल‍प्रबंधन‍व्‍याूार।‍ुड़कों‍या‍ऄन्य‍ऄभेद्य‍ुतूों‍ु‍े ुतूी‍ जल‍प्रााू‍कज‍कम‍करन‍े और‍िजजधत‍करन‍े के‍जलए‍जडटेंिन‍लुक‍का‍ईपयजग‍दकया‍जा‍ुकता‍ू।, ‍आन्‍ूें‍ऐु‍े क्षेत्रों‍के‍जलए‍ जडज़ाआन‍दकया‍जाता‍ू‍, जजनम‍ेंाीावजल‍कज‍एक‍ुमयााजध‍के‍जलए‍रजककर‍रखने‍की‍अाश्यकता‍ूजती‍ू‍,तादक‍ठजु‍चीज‍ें नीचें‍ब,ठ‍जाएं‍और‍जलप्रााू‍कज‍कम‍दकया‍जा‍ुके।302 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] जी ूरी‍ुपं जिया ाँ(ग्रीन‍एुट्े ु) दकुी‍जनर्नमत‍ुंरचना‍अदद‍म‍ें ज,ुे‍ान, बाग, नदीतट,‍जाकाु, यजजनाबद्ध‍पाकव, ाृक्ष‍और‍भूदश्ृ ‍य‍ााल‍े क्षेत्र, मनजरंजक‍ ूररत‍क्षत्रे ,‍ूररत‍बेल्‍ट,‍ईद्यान‍और‍ूररत‍छत, अदद‍ज,ुी‍पाररजस्ट्थजतक‍जािेीताएं। ग्रीन-ब्ल‍ूफ,क्टर‍(जीबीएफ)‍ यू‍प्लॉट‍स्ट्तर‍पर‍जाजभन्न‍ूरी-नीली‍जािेीताओं‍ऄथावत‍छत‍के‍बगीचे,‍बरामदें‍या‍म्‍याती‍मंजजलों‍पर‍बगीचे,‍ूरी‍ दीाारें,‍भूदश्ृ य‍और/या‍जागत‍भूजम‍क्षेत्र‍अदद‍पर‍बगीचे)‍के‍ुंयजजन‍के‍जलए‍ईपयजग‍दकया‍जाने‍ााला‍एक‍कारक‍ू,।‍ ग्रीन-ब्ल‍ूआन्फ्रास्ट्रक्चर बुए-प,माने‍और‍बुए-प्रकायव‍ूररत‍और‍नी‍ली‍ुंपजि‍का‍परस्ट्पर‍जुड़ा‍नेटाकव,‍जज‍प्राकृजतक‍ूज‍ुकता‍ू‍, या‍बनाया‍गया‍ भूदश्ृ य‍/‍िूरी‍जडज़ाआन‍ूज‍ुकता‍ू।, ‍यू‍ऄाधारणा‍िूरी‍जनयजजन‍कज‍ुंदर्नभत‍करती‍ू‍, जूां‍जल‍जनकाय‍और‍भूजम‍ ऄन्यजन्याजश्रत‍ू,ैं और‍पयावारण‍और‍ुामाजजक‍लाभ‍प्रदान‍करते‍ुएए‍एक‍दुू रे‍की‍मदद‍ुे‍बढ़ता‍ू।, ूररत‍भान ऐुा‍भान,‍जज‍ऄपन‍े जडजाआन, जनमावण‍और‍ुंचालन‍ु‍े जलाायु‍और‍प्राकृजतक‍ााताारण‍पर‍नकारात्मक‍प्रभााों‍कज‍कम‍ या‍ुमाप्त‍करता‍ू,, और‍ुकारात्मक‍प्रभाा‍का‍ुृजन‍करता‍ू‍,और‍प्राकृजतक‍ुंुाधनों‍कज‍ुंरजक्षत‍रखता‍ू।, ूररत‍पररुर (ग्रीन‍क,म्पु) कम‍काबवन‍फुटलप्रट‍और‍जनाल‍िून्य‍उजाव‍ु‍े बनाया‍गया‍पररुर।‍ऐु‍े स्ट्थ‍ लों‍पर‍भान‍के‍जीानचक्र‍के‍ुभी‍चरणों‍म‍ें स्ट्थायी‍और‍पयावारण‍के‍ऄनुकूल‍व्‍याूारों‍कज‍लाग‍ू करत‍े ुमय‍ूररत‍और‍खलु ‍े स्ट्थ‍ ानों‍का‍ऄनुपात‍काफी‍ऄजधक‍रखा‍ जाता‍ू।, ग्रीन‍ुुे जाकाु‍प्राजधकरण‍और‍स्ट्थानीय‍जनकायों‍द्वारा‍लगाया‍गया‍प्रिल्ु ‍क,‍िूर‍में‍जाजभन्न‍पयावारण-ुंबंधी‍कायों‍और‍ आंटराेंिन‍कज‍बढ़ााा‍देने‍के‍जलए‍ईपयजग‍में‍लायी‍जाने‍ााली‍पृथक‍ूररत‍जनजध‍का‍जनमावण‍करता‍ू।, ग्रीन‍कॉररडजर प्राकृजतक‍नाजलयों, जल‍जनकायों‍के‍दकनारे-दकनारे‍प्रस्ट्‍ताजात‍जनरंतर‍ूररत‍और‍खलु े‍स्ट्‍थान‍जजनमें‍झाजडयों‍ु‍े युक्‍त‍भूजम,‍ बफर,‍बाढ‍के‍म,दान‍िाजमल‍ूज‍ुकते‍ू‍ैंतादक‍ूरी-नीली‍ुंपजियों‍का‍पूर‍िूर‍में‍व्‍यापक‍नटे ाकव‍ुृजजत‍ूज। ग्रीन‍कार पूरे‍िूर‍में‍पेड़-पौधों‍ुे‍जघरा‍कुल‍क्षेत्र‍जजुमें‍ुाावजजनक‍रूप‍ुे‍ुलु भ‍और‍ुाावजजनक‍रूप‍ुे‍प्रबंजधत‍ूरे‍स्ट्‍थान,‍पुएचं ‍ ुे‍परे‍ूररत‍स्ट्थ‍ ान,‍जनजी‍स्ट्ााजमत्ा‍ााली‍ूरी-भरी‍भूजम‍(खेत, जनजी‍ईद्यान‍ुजूत)‍और‍भानों‍पर‍ूररयाली‍ुे‍जघरा‍क्षेत्र‍ (ूररत‍छत, बरामदा‍में‍बगीचे‍अदद)‍िाजमल‍ू।, ग्रीन डाे लपमटें एररया (जीडीए)‍ ग्रीन‍डेालपमेंट‍एररया‍(जीडीए)नीजत‍के‍ऄनुुार‍बड़े‍ाृक्ष‍और‍भू-भाग‍ााले‍क्षेत्रों‍ुे‍युक्त‍ ‍कम‍घनत्ा‍और‍जनम्न‍ ‍भान‍फुट‍ लप्रट‍की‍जािेीता‍ााल‍ेक्षेत्र‍के‍जलए‍जचजननत‍क्षेत्र। ूररत‍ऄथ्व ास्ट्था‍(ग्रीन‍आकजनजमी) ऐुी‍ऄथव्ास्ट्थाएाँ‍जज‍काबवन‍ईत्ुजवन‍और‍प्रदीू ण‍म‍ें कमी‍लाएं, उजाव‍और‍ुंुाधन‍दक्षता‍बढ़ाएं‍और‍ज,ा‍जाजाधता‍और‍ पाररजस्ट्थजतकी‍तंत्र‍जुस्ट्टम‍की‍क्षजत‍की‍रजकथाम‍करें।‍ईदाूरणों‍में‍िूरी‍खेती, बागाानी, ुौर‍फामव, थीम‍पाकव‍अदद‍ िाजमल‍ू।ैं[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 303 ग्रीनफील्ड‍क्षत्रे एक‍िूर‍के‍भीतर‍िूरी‍ईपयजग‍के‍जाकाु‍के‍जलए‍ईपलब्ध‍नए‍क्षेत्र, अमतौर‍पर‍नए‍जाकाु‍के‍जलए‍बड़ी‍खाली‍ जमीनों‍पर। ूररत‍ईंधन ूररत‍ईंधन‍या‍ज,ा‍ईंधन,‍ूाआड्रजकाबवन‍ू‍, जज‍दक‍एक‍जीजात‍जीा‍ुे‍या‍ईुके‍द्वारा‍बनाया‍जाता‍ू‍, जजुका‍ईपयजग‍ उजाव‍ईत्पन्न‍करन‍े के‍जलए‍दकया‍जा‍ुकता‍ू।, ग्रीन‍फंड ूरी-नीली‍ुंपजियों‍की‍ुुरक्षा‍और‍ाृजद्ध‍ुंबंधी‍गजतजाजधयों/‍पूल‍के‍जलए‍ुमर्नपत‍कजी। ग्रीनाज़े ग्रीनाे‍बुए-दक्रयािील‍रेखीय‍भदू श्ृ य‍ू‍ैं जजनु‍े बुएत-‍ुे‍ुामाजजक-पाररजस्ट्थजतक‍लाभ‍प्राप्‍त‍ूजत‍े ू।ैं ‍जब‍आन्‍ू‍ें प्राकृजतक‍ नालों‍और‍नददयों‍के‍अुपाु‍बनाया‍जाता‍ू,, तज‍ये‍प,दल‍चलने‍ाालों‍और‍ुाआदकल‍चालकों‍के‍जलए‍िूर‍स्ट्तरीय‍ ुमर्नपत‍कॉररडजर‍के‍रूप‍में‍जाकजुत‍दकए‍जाने‍की‍ऄपार‍ुंभाानाएं‍प्रदान‍करते‍ू।ैं ‍ऐुे े‍ूररतमागव‍ुुखपूावक‍प,दल‍ चलन,े‍परराार‍के‍जपकजनक‍मनाने, ुाआदकल‍चलाने‍अदद‍के‍जलए‍ुरु जक्षत‍स्ट्थ‍ ान‍के‍ुाथ‍अुपाु‍के‍क्षेत्र‍में‍एक‍ कायवनीजतक‍ुदक्रय‍कॉररडजर‍के‍जलए‍कनेक्िन‍प्रदान‍करन‍े का‍दजूरा‍काम‍करत‍ेू।ैं ुकल‍अााुीय‍ईपयजग दकुी‍अााुीय‍नेबरुएड‍म‍ें स्ट्थ‍ ानीय‍स्ट्त‍ र‍पर‍अ‍बादी‍के‍जलए‍पाकव,‍स्ट्थानीय‍िॉलपग‍ुटें र, स्ट्कूल, औीधालय, धार्नमक‍ भान, युरटजलटी‍और‍ऄन्य‍अाश्यक‍ुुजाधाएं‍ूजती‍ू।ैं एच धरजूर‍ुपं जिया ाँ धरजूर‍ुंपजियों‍म‍ें मूत‍व (चल‍और‍ऄचल‍धरजूर‍ुंपजियां‍ज,ुे‍पेंरटग,‍मूर्नतया,ं पांडुजलजपयााँ‍अदद‍और‍स्ट्मारक, धरजूर‍ भान,‍स्ट्‍थल,‍स्ट्थान, गजलया,ाँ क्षत्रे ,‍बगीच,े‍भूदश्ृ ‍य‍अदद)‍और‍ऄमतू व‍तत्ा‍(व्‍याूार, ज्ञान, कौिल, रून-ुून‍ऄजभ्जि ‍ और‍परंपराएं‍ज,ुे‍दक‍त्यजूार, कला‍रूप‍और‍लजक‍ुंस्ट्कृजत, खानपान,‍नृत्य‍और‍नाटक‍अदद।),‍दजनों‍िाजमल‍ू।ैं ूरे रटेज‍जबलल्डग ुंबंजधत‍एजेंुी‍और‍िूरी‍स्ट्थानीय‍जनकायों‍द्वारा‍ुूचीबद्ध‍और‍ऄजधुूजचत‍कजइ‍भी‍प्रजतजष्ठत/ऐजतूाजुक‍रूप‍ु‍े मूत्ापूणव‍भान।‍ातवमान‍म‍ेंददल्ली‍के‍भीतर‍1459‍ऄजधुूजचत‍धरजूर‍भान‍ू।ैं ूरे रटेज‍टीडीअर भूजम‍/‍ुंपजि‍के‍माजलक‍कज‍धरजूर‍भान‍/‍स्ट्थल‍की‍ुुरक्षा‍के‍कारण‍ईनकी‍भूजम‍के‍जाकाु‍ऄजधकारों‍में‍कमी/ूाजन‍के‍ जलए‍एफएअर‍के‍रूप‍म‍ें दी‍गइ‍प्रजतपूर्नत। धरजूर‍ईपक्षत्रे ‍यू‍ुंबंजधत‍एजेंुी‍द्वारा‍पूचाना‍गया‍क्षेत्र‍ू‍, जजुे‍ऐजतूाजुक‍और/या‍ाास्ट्तुजिल्प‍और/या‍ुौंदय‍व और/या‍ ुांस्ट्कृजतक‍और/या‍पयावारणीय‍और/या‍पाररजस्ट्थजतक‍ईद्देश्य‍के‍जलए‍ुरं क्षण‍और/‍या‍परररक्षण‍की‍अाश्यकता‍ू।, ूरे रटेज‍जजन ऐजतूाजुक‍मूत्ा‍का‍एक‍बड़ा‍ुजन्नजूत‍क्षेत्र‍जजुमें‍जािेी‍जनर्नमत‍ुंरचना,‍मूतव‍और‍ऄमूत‍वधरजूर‍ुंपजि‍के‍ुंग्रू,‍दकुी‍ जािेी‍राजांि/यगु ‍या‍स्ट्थापत्य‍िल, ी‍अदद‍के‍ुाथ‍जुड़ाा‍ज,ुी‍जािेीताएं‍ूों। घरेल‍ूईद्यजग‍(एचएचअइ) ुभी‍अााुीय‍क्षेत्रों‍म‍ें (गर, ‍औद्यजजगक‍गजतजाजध‍क्षेत्रों‍कज‍छजड़कर)‍कुछ‍ितों‍के‍ुाथ‍ऄनुमत‍एक‍ग,र‍प्रदीू णकारी, जाीाक्त‍ ता‍मुक्त‍ ‍औद्यजजगक‍आकाइ।304 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] अइ प्रभााी‍क्षत्रे ‍यजजना‍(अइजडे पी) दकुी‍टीओडी‍नजड‍के‍पररुीजमत‍टीओडी‍यजजना‍क्षेत्र‍के‍जलए‍त,यार‍की‍गइ‍एक‍एकीकृत‍यजजना, जजुमें‍जाजभन्न‍क्षेत्र‍ ुुधार‍काय‍व ज,ुे‍ुड़क‍कज‍चौड़ा‍करना, ुाावजजनक‍ुड़कों‍के‍बुए-ईपयजजगता‍क्षेत्रों‍कज‍ईन्नत‍करना, और‍अइपीटी,‍प,दल‍ यात्रा‍और‍एनएमटी‍के‍जलए‍ुुजाधाएं,‍बुए-मजडल‍एकीकरण, ुाावजजनक‍पार्ककग‍का‍प्रााधान, िूरी‍फनीचर, ुाआनेज, ुाावजजनक‍ुुजाधाएं, स्ट्रीट‍ाेंलडग‍जजन‍अदद‍िाजमल‍ू।ैं एकीकृत‍जीडीए‍यजजना‍(अइजीपी) ग्रीन‍डेालपमेंट‍एररया‍(जीडीए)(जीडीए)‍में‍पूचान‍दकए‍गए‍क्षेत्र‍के‍जलए‍एक‍्ापक‍ुंरचना‍यजजना। परस्ट्पर‍ुबं जं धत‍क्षत्रे प्राकृजतक‍और‍धरजूर‍ुंपजियों‍के‍भीतर‍पूचाने‍गए‍जाजिष्ट‍क्षेत्र‍और‍रेल्ु, जूां‍मनजरंजन‍के‍प्रयजजनाथव‍पयावप्त‍ ुुजाधाओं‍(प्रुाधन,‍पेयजल,‍फव्ाारे, जाश्राम‍स्ट्थल, अगंतुक‍ुूचना‍केंद्र‍अदद)‍के‍प्रााधान‍के‍ुाथ‍पूणव‍या‍जाजनयजमत‍ ुाावजजनक‍पुएचं ‍की‍ऄनुमजत‍दी‍जा‍ुकती‍ू।, आंटरमीजडएट‍पजब्लक‍राुं पजटव‍(अइपीटी) आंटरमीजडएट‍पजब्लक‍रांुपजटव‍(अइपीटी)‍जजुमें‍परराून‍के‍जलए‍ऑन-जडमांड‍मजड‍(ट,जक्ुयां, ऑटज-ररक्िा‍अदद)‍ िाजमल‍ू,ैं जजनका‍कजइ‍जनजित‍रूट‍नूीं‍ूजता। के नजलजे ‍बस्ट्े ड‍आंडस्ट्रीज/‍ुाआबर‍आकजनजमी ईद्यजग‍जज‍प्रौद्यजजगकी‍के‍गून‍ईपयजग‍और‍ऄनुुंधान‍और‍जाकाु‍एां‍ज्ञान‍आनपुट‍के‍मानदडं ों‍पर‍अधाररत‍ू।, ‍ईदाूरण‍ के‍ जलए,‍ स्ट्‍ाास्ट्‍्‍य‍ बायजटेक, दरू ुंचार,‍ ुूचना‍ प्रौद्यजजगकी,‍ ुॉफ्टाेयर, ाायजाकी,‍ ुाआबर‍ ऄथवव्‍यास्ट्थ‍ ाओं,‍ ूाइ-टेक‍ रजबजरटक्ु‍एंड‍आलेक्रॉजनक्ु, ज्ञान‍और‍नााचार,‍ऄनुुंधान‍एां‍जाकाु‍अदद‍में‍िाजमल‍फमें। एल लडैं ‍पलू लग भूजम‍नीजत‍और‍लडैं ‍पूललग‍नीजत‍के‍ुंचालन‍के‍जलए‍जाजनयम‍के‍ऄनुुार‍ईपयजग‍के‍जलए‍भूखण्‍डों‍का‍कानूनी‍ुमेकन। लास्ट्ट‍माआल‍कनजे क्टजाटी आुुे‍मूल‍स्ट्‍थान‍ुे‍रांजजट‍प्रणाली‍ऄथाा‍रांजजट‍प्रणाली‍ुे‍गतं ्‍तक‍की‍यात्रा‍ऄजभप्रेत‍ू‍,ज,ुेदक‍दकुी‍परराून‍स्ट्टेिन‍ ज,ुे‍रेला‍ेस्ट्टेिन, बु‍जडपज‍या‍मेरज‍स्ट्टेिन‍ुे‍ऄपन‍ेऄंजतम‍गतं ्‍या‍आुके‍जापरीत‍जान‍े ााले‍लजग। जनम्न-काबनव ‍प्रौद्यजजगकी यू‍ग्रीनूाईु‍ग,ु‍ईत्ुजवन‍कज‍कम‍करने‍और‍ग्‍लजबल‍ाार्ममग‍कज‍रजकने‍का‍‍एक‍तरीका‍ू।, जनम्न-काबवन‍प्रौद्यजजगकी‍जनम्न-काबवन‍या‍काबवन-मुि ‍के‍जलए‍ुभी‍ुाधनों‍और‍जाजधयों‍का‍ुामान्यीकरण‍करती‍ू।, ‍यू‍ जनम्न-काबवन‍ऄथव्ास्ट्था‍के‍ऄनकु ूल‍ूजन‍े की‍अाश्यकता‍के‍जलए‍ईपयुक्‍त‍ू।,[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 305 एम ऄजनााय‍वाजु डड‍क्षत्रे ूररत‍जाकाु‍यजजनाओं‍के‍जूस्ट्ुे‍के‍रूप‍में‍प्राकृजतक‍ाृक्षों‍(प्राकृजतक‍ऄनलाइन्‍ड‍जलाश्‍यों‍ुजूत)‍ुे‍ढके‍क्षेत्र‍कज‍्ाजस्ट्थत‍ रखा‍जाए।‍पेड़ों‍म‍ें 70%‍या‍ऄजधक‍का‍केनजपी‍घनत्ा‍ूजगा‍और‍आुमें‍ऐुी‍प्रजाजतया‍ं ूोंगी‍जजन्ू‍ें कम‍पानी‍की‍ अाश्यकता‍ूजती‍ू‍,और/या‍प्रदीू ण‍जनयंत्रण‍के‍जलए‍प्रभााी‍ूज,‍ज,ुा‍दक‍ुक्षम‍प्राजधकारी‍द्वारा‍ऄनिु ंजुत‍ूज। मख्ु य‍पनु रूद्धार‍यजजना यू‍ऐुी‍यजजना‍ू‍, जज‍जाजभन्न‍एजेंजुयों‍द्वारा‍मौजूदा‍ुकुवलेिन‍नेटाकव‍कज‍बढ़ाने‍और‍पुनरूद्धार‍करने‍के‍जलए‍छजटे‍ पॉकेट्ु/ब्लॉक‍बनान‍ेके‍जलए‍बड़े‍मौजूदा‍जाकजुत‍क्षेत्रों‍के‍जलए‍त,यार‍की‍जाएगी। माआक्रज‍मजजबजलटी ूररत-मजजबजलटी‍जाकल्प‍जज‍ुदक्रय‍यात्रा‍ज,ुे‍ब,टरी‍चाजलत‍ुाआदकल, इ-बाआक‍अदद‍कज‍बढ़ााा‍देते‍ू।ैं न्यनू तम‍ऄपजिष्ट‍लजकेजलटी‍(एमडब्ल्यएू ल) ऐुी‍लजकेजलटी‍(अााुीय‍क्षेत्र, ूाईलुग‍ुजुाआटी, कॉलजनी, ऄपाटवमेंट, बाजार‍अदद)‍जूां‍ुभी‍गीला‍ठजु‍ऄपजिष्ट‍का‍ प्रबंधन‍पयावारण‍के‍ऄनुकूल‍ुमाधानों‍ज,ुे‍खाद‍और‍ज,ा-मीथेनिे न‍अदद‍के‍मा्यम‍ुे‍लजकेजलटी‍ुीमाओं‍के‍भीतर‍दकया‍ जाता‍ू।, जमयाााकी‍ान ानीकरण‍तकनीक‍द्वारा‍बनाया‍गया‍एक‍घना, बुएस्ट्त‍ रीय‍िूरी‍ान‍जजुमें‍ददए‍गए‍क्षेत्र‍में‍कइ‍देिी‍प्रजाजतयों‍का‍रजपण‍ करना‍िाजमल‍ू।, ‍यू‍पाररजस्ट्थजतकी‍तंत्र‍के‍ररस्ट्टजरेिन, प्रदीू ण‍कज‍जनयंजत्रत‍करन,े िूरी‍गमी‍के‍जमीन‍पर‍प्रभााों‍कज‍ कम‍करन‍ेऔर‍स्ट्थानीय‍ान्यजीाों‍का‍ुमथवन‍करने‍म‍ेंएक‍प्रमखु ‍भूजमका‍जनभा‍ुकता‍ू।, बुए-ुजु ाधा‍भखू डं एक‍भूखंड,‍जूााँ‍एक‍ूी‍भूखण्ड‍ ‍म‍ें एक‍या‍एक‍ुे‍ऄजधक‍आमारत‍म‍ें एक‍जमजश्रत‍तरीके‍ुे‍जाजभन्न‍स्ट्थानीय‍ुुजाधाए‍ं जाकजुत‍दकए‍जाने‍का‍प्रस्ट्‍ताा‍ू।, मल्टी-मॉडल‍आंटीग्रिे न‍(एमएमअइ) रेल‍और‍ुड़क-अधाररत‍प्रणाजलयों‍का‍एकीकरण,‍जजुमें‍मरे ज, रेल‍/‍र,जपड‍रेल, बु‍/‍बीअरटीएु‍और‍आंटरमीजडएट‍ ुाावजजनक‍परराून‍(अइपीटी)‍िाजमल‍ूज‍ुकत‍े ू‍ैं जजनम‍ें गर, -मजटर‍चाजलत‍परराून‍(एनएमटी)‍ज,ुे‍ुाआदकल-ररक्िा, ुाआदकल, प,दल, अदद‍ुजूत‍फीडर‍ुेााएं, ट,जक्ुयां, ऑटज-ररक्िा‍और‍जनजी‍मजड‍िाजमल‍ू।ैं मल्टी-मजडल‍राुं पजटव‍ूब‍(एमएमटीएच) एक‍रांजजट‍नजड‍जूा‍ं एक‍स्ट्‍थान‍पर‍कइ‍मजड‍ूों‍ज,ु‍े रेला‍े स्ट्टेिन, अइएुबीटी,‍अरअरटीएु स्ट्टेिन‍और‍मेरज‍स्ट्टेिन‍ अदद। बुए-ईपयजजगता‍क्षत्रे ‍(एमयजू डे ) िूरी‍ुड़कों‍पर‍फुटपाथ/ुाआदकल‍र,क‍और‍मजटर‍ााून‍लने ‍के‍बीच‍एक‍ुमर्नपत‍स्ट्थान‍का‍तत्ा,‍जूां ईनके‍भीतर‍ जनम्नजलजखत‍कायों‍म‍ें ु‍े दकुी‍एक‍या‍ुभी‍के‍जलए‍स्ट्थान‍का‍प्रााधान‍ू:,‍ाृक्षारजपण, ऑटज‍/‍ुाआदकल-ररक्िा‍स्ट्टैंड, ूॉकर‍जजन, पार्ककग, स्ट्रीट‍फनीचर, बु‍स्ट्टॉप, ुाावजजनक‍िौचालय, ुूचना‍दकयजस्ट्क, यातायात‍पुजलु‍बूथ‍और‍जबजली, पानी, ऄजग्न‍ूाआड्रेंट, टेलीफजन, ग,ु‍अदद‍ज,ुे‍भूजमगत‍और‍ओारूडे ‍ईपयजजगता‍ुेााएं।306 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] एन प्राकृजतक‍ुपं दा प्राकृजतक‍पाररजस्ट्थजतक‍जािेीताएं‍ज,ुे‍ान,‍ररज, नदी, नाल,े नाजलयां, झील,ें तालाब‍और‍अद्रभव ूजम‍अदद। नाआटलाआफ‍ुर्दकट ुाावजजनक‍स्ट्‍थान‍नेटाकव‍जजनुे‍ुुरक्षा‍म‍ें ुुधार, ऄलग-ऄलग‍ुमय‍पर‍गजतजाजधयों‍द्वारा‍भीड़‍कम‍करके,‍जाजभन्न‍ गजतजाजधयों‍ के‍ जलए‍ ररि ‍ स्ट्थान‍ का‍ ऄजधकतम‍ ईपयजग‍ करके‍ और‍ औपचाररक‍ के‍ ुाथ‍ ूी‍ ऄनौपचाररक‍ अर्नथक‍ गजतजाजधयों‍के‍जलए‍ईत्पादकता‍में‍ुुधार‍करके‍और‍नाआट‍आकजनजमी‍का‍जनमावण‍करके‍एक‍ुदक्रय‍नाआट‍लाआफ‍कज‍बढााा‍ जमलता‍ू।, र,न‍बुरे ा ्जि यों‍कज‍जन:‍िुल्क‍या‍नाममात्र‍िुल्क‍पर‍राजत्र‍अााु‍ईपलब्ध‍कराने‍की‍ुुजाधा‍देनेााला‍पररुर।‍यू‍स्ट्थानीय‍ ुरकार‍या‍स्ट्‍ायंुेाी‍एजेंजुयों‍द्वारा‍चलाया‍जा‍ुकता‍ू।, नाआट‍आकजनजमी‍(एनटीइ) िूर‍और‍ईन‍क्षेत्रों‍म‍ें जनरंतर‍काम‍और‍ईत्पादन‍के‍जलए‍ाक, जल्पक‍ुमय‍और‍स्ट्थान‍प्रदान‍करन‍े ााली‍जाजभन्न‍अर्नथक‍ गजतजाजधयां,‍जज‍पयवटकों‍और‍स्ट्थानीय‍लजगों‍कज‍राजत्र‍म‍ें अकर्नीत‍करन‍े के‍जलए‍ुांस्ट्कृजतक‍गजतजाजध‍और‍मनजरंजन‍के‍ जलए‍खुल‍ेरूते‍ू।ैं एनएमाी / ुाआदकल‍र,क ुाआदकल,‍ुाआदकल‍ररक्िा‍और‍ूडैं ‍पलु ‍गाजड़यों‍ज,ु‍ेमजटर‍रजूत‍चाजलत‍ााूनों‍की‍अााजाूी‍के‍जलए‍अरजक्षत‍स्ट्थान। गर, -मजटर‍चाजलत‍परराून‍(एनएमटी) ुदक्रय‍परराून,‍जजुमें‍प,दल‍चलना, ुाआदकल‍चलाना‍और‍मनुष्‍य‍द्वारा‍ुंचाजलत‍अााजाूी‍के‍ऄन्य‍रूप‍िाजमल‍ू‍ैं (ुाआदकल-ररक्िा, ठेले‍अदद)। ओ ऑन-स्ट्रीट‍पार्ककग ऄजधकृत‍पार्ककग‍जज‍राइट‍ऑफ‍ाे‍(अरओडब्‍ल्‍य)ू के‍ऄतं गतव ‍ूज। ऑफ-स्ट्रीट‍पार्ककग ऄजधकृत‍पार्ककग‍जज‍दकुी‍जनर्नमत‍ुंरचना‍(ऄंडरग्राईंड,‍भूतल‍पर‍या‍भूतल‍ु‍े उपर)‍या‍ुतू‍पार्ककग‍के‍रूप‍म‍ें बाूर‍ खुले‍म‍ेंूज‍ुकती‍ू।, ‍यूां‍एक‍ड्राआााे‍(जजुुे‍ब,ररयर‍अधाररत‍भगु तान‍प्रणाली‍ूजती‍ू), ‍ु‍ेप्राेि‍ूजता‍ू।, पी पार्ककग‍प्रबधं न‍क्षत्रे ‍(पीएमए) पार्ककग‍ु‍े ुंबंजधत‍क्षेत्र‍ज,ुे‍दक‍मांग‍का‍प्रबंधन‍करने,‍अपूर्नत‍म‍ें ाृजद्ध‍करन,े ईपलब्ध‍पार्ककग‍जाजनयजमत‍करन‍े और‍ पार्ककग‍ुे‍ुंबंजधत‍बाह्य‍तत्ाों‍कज‍कम‍करन‍ेके‍जलए‍जनधावररत‍क्षेत्र। पार्ककग‍प्रबधं न‍क्षत्रे ‍यजजना‍(पीएमएपी) पार्ककग‍प्रबंधन, मौजूदा‍पार्ककग‍स्ट्थलों‍का‍ईपयजग, पार्ककग‍िुल्क, कंजेिन‍प्राआलजग,‍अइटीएु‍एप्‍लीकेिन‍और‍यजजना‍के‍ प्रातवन‍ुजूत‍जनर्ददष्ट‍पार्ककग‍प्रबंधन‍क्षेत्र‍(पीएमए) के‍जलए‍तय, ार‍की‍गइ‍यजजनाएाँ।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 307 प्ल‍ेस्ट्रीट खेल‍और‍मनजरंजन‍के‍ईद्देश्य‍के‍जलए‍एक‍जािेी‍ऄाजध‍के‍जलए‍ऄस्ट्थायी‍रूप‍ुे‍यातायात‍के‍जलए‍बंद‍की‍जान‍े ााली‍ स्ट्थानीय‍ुड़कें। जनजी‍स्ट्ााजमत्ा‍ााल‍ेुााजव जनक‍स्ट्थान‍(पीओपीएु) ऐुे‍स्ट्‍थान‍जज‍जनजी‍ुंपजि‍ू‍ैं और‍जजनका‍रखरखाा‍माजलक‍/‍डेालपर‍द्वारा‍दकया‍जाता‍ू‍, लेदकन‍जूां‍भान‍के‍भीतर‍ ग्राईंड‍या‍एजलाेरटड‍स्ट्तर‍पर‍जाजनयजमत‍घंटों‍के‍दौरान‍खलु ी‍ुाावजजनक‍पुएचं ‍ू।, जनजी‍पार्ककग पार्ककग‍जज‍ईपयजगकतावओं‍के‍जाजिष्ट‍ुमूूों, ज,ुे‍जनााजुयों‍या‍दकरायेदारों‍के‍जलए‍अरजक्षत‍ू।, ुााजव जनक‍कला कलात्मक‍्ाख्याओं‍के‍मा्यम‍ुे‍ुाावजजनक‍रूप‍ुे‍ुलु भ‍स्ट्थानों‍के‍ुंाधवन‍और‍जीांत‍बनाने‍के‍जलए‍ुाआट‍जाजिष्ट‍ कलाकृजत‍जज‍एक‍्जि ‍मूर्नतकला‍ुे‍लेकर‍एकीकृत‍ाास्ट्तुजिल्प‍और‍भूदश्ृ य‍जािेीताओं‍और‍िजधनों‍तक‍ूजती‍ू।, ुााजव जनक‍प्लाजा: अु-पड़जु‍के‍चौक‍और‍नुक्कड़‍ुे‍लेकर‍ुंस्ट्थागत‍फ्रंट‍कजटव, ‍िूर‍के‍चौक‍और‍जपयाजा‍तक‍के‍प्लाज़ा‍और‍य‍े अाागमन‍ नेटाकव‍के‍ुाथ‍मूत्ापूण‍व ठूराा‍स्ट्‍थलों‍का‍ुृजन‍करत‍े ू।ैं ुााजव जनक‍क्षत्रे एक‍ऄजनाायव‍िूरी‍ुामान्य‍क्षेत्र,‍जजुमें‍िूर‍के‍िेयडव‍पजब्लक‍क्षेत्र‍िाजमल‍ूों,‍जज‍ुभी‍ुे‍ुंबंजधत‍ूों‍और‍ुभी‍की‍ पुएचं ‍में‍ूों,‍ज,ुे‍स्ट्रीट्ु‍पजब्लक‍और‍प्राआाेट‍प्लाजा,‍पाकव,‍ओपन‍स्ट्पेु‍अदद।‍ ुााजव जनक‍स्ट्थान ऐुा‍क्षेत्र‍या‍स्ट्थान‍जज‍ुभी‍लजगों‍के‍जलए‍खुला‍और‍ुुलभ‍ू,,‍चाू‍े ईुका‍ ललग, जाजत, अयु‍या‍ुामाजजक-अर्नथक‍स्ट्तर‍ कुछ‍भी‍क्य‍ ों‍न‍ूज।‍आनम‍ें ुाावजजनक‍ुभा‍स्ट्थल‍(प्लाज़ा,‍चौक, पाकव)‍के‍ुाथ-ुाथ‍कनेलक्टग‍स्ट्‍थल‍(ुड़क, ुबाे)‍अत‍े ू।ैं ‍ जाजभन्‍न‍ुांस्ट्कृजतक, ुामाजजक‍और‍अर्नथक‍मूत्ा‍के‍कइ‍ुाावजजनक‍स्ट्थानों‍कज‍गजतजाजध‍नजड्ु‍के‍रूप‍म‍ें जजडा‍जाता‍ू‍, और‍ये‍नेटाकव‍ुाावजजनक‍जीान‍कज‍जीांत‍बनात‍े ू।ैं ुााजव जनक‍ााटरफ्रंट्ु क्षेत्रों‍में‍जलाश्‍यों‍के‍अुपाु‍जनर्नमत‍ुाावजजनक‍स्ट्थान‍जज‍पूले‍ईपेजक्षत‍थ‍े ज,ुेदक‍यमुना‍बाढ़‍के‍म,दान, नाजलयों‍और‍ जलाश्‍य‍अदद। ुााजव जनक‍परराून‍पुएचं ‍स्ट्तर‍(पीटीएएल) प,दल‍चलने‍में‍लगने‍ााले‍ुमय‍और‍ुेाा‍की‍ईपलब्धता‍कज‍्यान‍में‍रखते‍ुएए‍दकुी‍क्षेत्र‍की‍ुाावजजनक‍परराून‍नेटाकव‍ (ुभी‍ुाावजजनक‍परराून‍मजड,‍अइपीटी‍अदद‍ुजूत)‍की‍पुएचं ‍का‍एक‍जास्ट्तृत‍और‍ुटीक‍मापन। ुााजव जनक‍पार्ककग पार्ककग,‍जज‍अकजस्ट्मक‍ऄल्पााजध‍पार्ककग‍ईपयजग‍के‍जलए‍अम‍जनता‍के‍जलए‍खुली‍ू।, अर पनु रूद्धार एक‍लचीला‍ढांचा, जज‍दकुी‍क्षेत्र‍के‍जाकाु‍के‍जलए‍ईपकरणों‍के‍जमश्रण‍का‍ईपयजग‍करने‍की‍ऄनुमजत‍दते ा‍ू,, नामत:‍ रेरजदफरटग, पुनर्ननमावण‍या‍पूण/व ‍अंजिक‍पनु र्नाकाु, बितें‍ुतत‍ुेााओं, ुंरचनात्मक‍ुुरक्षा‍और‍बेूतर‍प,दलयात्रा‍की‍ ऄपेक्षाएं‍परू ी‍की‍जाएं।308 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ररफ्यजू ‍स्ट्पॉट अर.डब्ल्य.ूए.‍/ स्ट्थानीय‍जनकायों‍द्वारा‍पूचान‍दकया‍गया‍कजइ‍भी‍नेबरुएड‍के‍भीतर‍स्ट्थान‍जज‍ुंक्रमण‍बीमारी‍अईटब्रेक‍ के‍ुमय‍पर‍स्ट्ास्ट्थ‍तथा‍ऄस्ट्ास्ट्थ‍जनााजुयों‍के‍जलए‍ा,कजल्पक‍स्ट्थान‍ईपलब्ध‍कराता‍ूज।‍ऐु‍े स्ट्थान‍ुामुदाजयक‍केन्द्र,‍बुए‍ ुुजाधाजनक‍केन्द्र‍या‍ऄन्य‍दकुी‍ुाावजजनक‍पुएचं ‍ुुजाधा‍में‍ूज‍ुकते‍ू।ैं ‍ दकराय‍ेअााु‍(रेंटल‍ूाईलुग) अााुीय‍ुंपजियां,‍जजनम ें डीयू‍और/या‍ियनगृू‍ूों‍जज‍दक‍ुमझौत‍े या‍ऐुे‍दकुी‍िपथपत्र‍ज,ुे‍औपचाररक‍तंत्र‍के‍ मा्यम‍ुे‍ुंभाजात‍दकराएदार‍कज‍दकराए‍पर‍लेन‍े के‍जलए‍जािेी‍रूप‍ु‍ेईपलब्ध‍ू।ैं रररजदफरटग एक‍मौजूदा‍ुंरचना‍म‍ें ईु‍ुंरचना‍कज‍बाढ़‍या‍कटाा, तेज‍ूाा,‍भूकंप‍या‍ऄन्य‍खतरों‍ुे‍नकु ुान‍की‍ुंभााना‍कज‍कम‍ करने‍या‍ुमाप्त‍करन‍े के‍जलए‍ईु‍ुंरचना‍कज‍नइ‍तकनीक‍या‍ुुजाधाओं‍ुे‍युक्‍त‍करना। राआट‍ऑफ‍ा‍े(अरओडब्ल्‍य‍ )ू यातायात‍के‍ुभी‍ुाधनों‍की‍अााजाूी‍के‍जलए‍एक‍अरजक्षत‍स्ट्थान‍जजुमें‍प,दल‍यात्री, ुाआदकल, ुाआदकल‍ररक्िा, बु, कार, स्ट्कूटर, ट,क्ुी, ऑटजररक्िा, अदद‍िाजमल‍ू।ैं ‍प,दल‍चलन‍े के‍स्ट्थ‍ ान‍ऄथाा‍मजटर‍ााून‍अााजाूी‍स्ट्थ‍ ान‍पर‍ ऄजतक्रमण‍दकए‍जबना‍ुेााओं, भूजमगत/‍भूजम‍पर‍यूरटजलटी,‍पजब्लक‍कनजाजनयंु‍और‍ुुजाधाओं, जाक्रेताओं,‍पेयजल‍ दकयजस्ट्‍क‍अदद‍के‍जलए‍अरओडब्‍ल्‍यू‍के‍भीतर‍स्ट्‍थान‍जनयजजजत‍और‍अरजक्षत‍दकया‍जाता‍ू।, एु ुक्े टर मौजूदा‍या‍प्रस्ट्ताजात‍ुड़कों‍या‍भौजतक‍ुुजाधाओं‍ज,ु‍े दक‍ूाइ‍टेंिन‍तारों,‍रेलाे‍लाआनों, नाजलयों‍अदद‍ुे‍युक्त‍ ‍जजनल‍ डेालपमेंट‍प्लान‍(जडे डीपी)‍में‍एक‍जनधावररत‍क्षेत्र,‍जजुका‍क्षेत्रफल‍………..‍ूक्, ट‍ेयर‍ू।, ुाे ा‍बाजार‍(ुर्नाु‍माकेट) ऐुा‍क्षेत्र‍या‍बाजार‍जूा‍ं फलों‍और‍ुजब्जयों, ुेाा‍और‍मरम्मत, कबाड़‍और‍स्ट्क्र,प‍ुामग्री‍(कबाड़ी), ूाडवाेयर‍और‍ जनमावण‍ुामग्री, ऑटजमजबाआल‍मरम्मत‍ाकविॉप‍अदद‍ूों,‍देखें‍इुीओ‍1, खंड‍3.6 ुाे ा‍प्रदाता‍एजुें ी जल‍अपूर्नत, ुीारेज‍जनपटान, जबजली‍अपूर्नत, ुड़कों‍का‍जनमावण, ुंचार‍और‍ऄन्य‍जातरण‍ुेााएं‍अदद‍ज,ुी‍ुेााए‍ं प्रदान‍करने‍के‍जलए‍ईत्‍तरदायी‍एजेंुी। एकल‍जखड़की‍प्रणाली दकुी‍जािेी‍नीजत/‍यजजना‍के‍कायावन्ायन‍कज‍ुमयबद्ध‍तरीके‍ुे‍लागू‍करन‍े के‍जलए‍अाेदन, ुत्यापन, ऄनुमजदन, जिकायत‍अदद‍प्राप्त‍करने‍के‍जलए‍एकल‍ऑनलाआन‍प्लेटफॉमव‍के‍रूप‍में‍जाकजुत‍दकए‍गए‍इज‍ऑफ‍डूआंग‍ईपाय। ुाझा‍गजतिीलता‍(िये ड‍वमजजबजलटी) ुाझा‍गजतिीलता‍ुे‍परराून‍के‍ुभी‍ुाधन‍ऄजभप्रते ‍ू‍, जज‍जनजी‍स्ट्ााजमत्ा‍ााले‍नूीं‍ू।ैं ‍आनमें‍ु‍े ऄजधकांि‍मजड‍म‍ें जनधावररत‍रूट‍और‍जनधावररत‍मूल्‍य‍और‍जनधावररत‍ुमय-ुीमा‍(ज,ुे‍बुों, मूानगरों‍अदद)‍ूजत‍े ू।ैं ‍आुमें‍ुभी‍मांग- अधाररत‍मजड‍भी‍िाजमल‍ू‍ैं जज‍अरंजभक‍और‍ऄंजतम‍छजर‍की‍कनेजक्टजाटी‍(ुाझा‍ऑटज, ररक्िा, ट,क्ुी, अदद)‍प्रदान‍ करते‍ू।ैं छजटे‍अकार‍के‍अााु 40 - 60‍ागव‍मीटर‍के‍अकार‍ााली‍अााु‍आकाआयााँ।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 309 ुौर‍फाम व ुौर‍फामव‍या‍ुौर‍क्षेत्र‍बड़े‍प,माने‍ााल‍े ुौर‍प्रजतष्ठान‍ू‍ैं जूां‍ुूयव‍की‍उजा‍व का‍ईपयजग‍करन‍े के‍जलए‍फजटजाजजल्टक‍पन, ल‍ (ुौर‍प,नल)‍का‍ईपयजग‍दकया‍जाता‍ू।, जािीे ‍एजबजलटीज‍पाकव ददव्‍यांग‍और‍जािेी‍अाश्यकताओं‍ााल‍े लजगों‍के‍ुाथ-ुाथ‍ईपयजगकतावओं‍(जािेी‍रूप‍ु‍े बुजुगव, बच्चों‍और‍केयरजगाु‍व के‍ ुाथ‍जििुओं)‍के‍खेलने‍और‍मनजरंजक‍गजतजाजधयों‍के‍जलए‍बनाए‍गए‍पाकव। जािीे ‍क्षत्रे जाकाु‍/‍पुनर्नाकाु‍की‍यजजना‍ााली‍जािेी‍जािेीताओं‍के‍जलए‍जनर्ददष्ट‍‍क्षेत्र। कायनव ीजतक‍ुदक्रय‍यात्रा‍कॉररडजर ुाआदकल‍चालकों‍और‍प,दल‍याजत्रयों‍की‍ातवमान‍या‍प्रत्याजित‍ईच्च‍ऄनुपात‍ााले‍और‍जाजभन्न‍गजतजाजध‍केंद्रों‍कज‍जजड़ने‍के‍ जलए‍पूचान‍े गए‍जािेी‍मागव। टी ुजु नयजजजत‍िूरीकरण ुुजनयजजजत‍िूरीााद‍या‍पॉप-ऄप‍िूरीााद,‍अरजक्षत‍लेन‍द्वारा‍प,दल‍याजत्रयों‍और‍एनएमटी‍अााजाूी‍कज‍प्राथजमकता‍ प्रदान‍करन‍े के‍जलए‍ुड़क‍के‍एक‍खंड‍कज‍ऄस्ट्थायी‍रूप‍ुे‍रररजदफट‍करने‍का‍एक‍ईपाय‍ू‍, जजुुे‍ुडक‍का‍जूस्ट्ु‍ ा‍प,दल‍ चलन‍े ाालों‍अदद‍के‍जलए‍ऄनकु ूल‍ूज‍जाता‍ू।, पारगमन-ईन्मखु ‍जाकाु‍(टीओडी) भूजम‍क्षमता‍कज‍ऄजधकतम‍करके, ईच्च‍घनत्ा, जमजश्रत‍ईपयजग‍और‍प,दल‍चलन‍े यजग्‍य‍ल‍और‍ुाआदकल‍चलान‍े यजग्य‍ नेबरुएड‍ईन्मुखी‍जडजाआन‍युक्‍त‍ईच्च‍क्षमता‍ााले‍रांजजट‍नजड‍के‍अुपाु‍एक‍कॉम्प,क्ट‍जाकाु। टीओडी‍नजड्ु डीडीए‍द्वारा‍ऄजधुूजचत‍गून‍जाकाु‍के‍जलए‍चयजनत‍और‍ऄजधुूजचत‍बड़ा‍पारगमन‍स्ट्टेिन।‍टीओडी‍(रांजजट‍ओररएंटेड‍ डेालपमेंट)‍नीजत‍के‍प्रााधान‍केाल‍ऐुे‍पूचान‍ेगए‍टीओडी‍नजड्ु‍के‍प्रभाा‍क्षेत्रों‍म‍ेंलागू‍ूोंगे। टीओडी‍यजजना‍क्षत्रे रांजजट‍स्ट्टेिनों‍के‍अुपाु‍500‍ुे‍800‍मीटर‍के‍दायरे‍का‍क्षत्रे । टीओडी‍यजजना टीओडी‍नजड‍के‍भीतर‍अने‍ााले‍और‍टीओडी‍नीजत‍में‍जनर्ददष्ट‍ुभी‍पात्रता‍मानदंडों‍कज‍पूरा‍करने ााले‍क्षेत्र‍के‍जलए‍एक‍ जाकाु‍प्रस्ट्ताा। राजं जट‍ूॉटस्ट्पॉट जमश्रण‍ईपयजग‍और‍ुाावजजनक‍गजतजाजध‍के‍केंद्र‍के‍रूप‍में‍जाकजुत‍पारगमन‍नजड्ु। ाक्षृ ‍जनदजे िका दकुी‍जािेी‍क्षेत्र‍में‍पेड़‍की‍प्रजाजतयों‍का‍एक‍डाटाबेु, जजुमें‍जािेी‍ाृक्ष‍ुमूू‍की‍पूचान‍की‍गइ‍ूज‍ज,ुे‍ाृक्ष‍कॉररडजर‍ ऄथाा‍धरजूर‍ाृक्ष,‍ईच्च‍काबवन‍भंडारण‍और‍ऄजधग्रूण‍दर‍अदद।310 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] य ू ऄनजधकृत‍कालजजनया‍ाँ(युू ी) ऐुी‍कॉलजजनयां‍/‍ुमीपाती‍क्षेत्र‍िाजमल‍ू‍ैं जज‍ुंबंजधत‍एजेंजुयों‍की‍यजजना‍के‍जुद्धांतों‍और‍लअे ईट‍यजजनाओं‍की‍ मंजूरी,‍जनमावण‍यजजनाओं‍पर‍जाचार‍दकए‍जबना‍जाकजुत‍दकए‍गए‍ू।ैं िूरी‍खते ी स्ट्थानीय‍अबादी‍की‍जरूरतों‍कज‍पूरा‍करने‍के‍जलए‍िूर‍में‍या‍आुके‍अुपाु‍पौधों‍की‍खेती‍या‍पिुपालन, जलीय‍कृजी‍ और‍िूरी‍मधुमक्खी‍पालन‍के‍मा्यम‍ुे‍भजजन‍और‍ऄन्य‍ईत्पादों‍का‍ईगाना,‍प्रुंस्ट्करण‍और‍जातररत‍करने‍का‍ व्‍याूाररक‍काय।व िूरी‍ानप्रदिे ुंरजक्षत‍ानों‍के‍भीतर‍के‍क्षेत्र‍जज लजगों‍कज‍जाजभन्न‍प्रकार‍की‍ानस्ट्पजतयों, जीाों‍और‍प्राकृजतक‍ााताारण‍तक‍पुएचं ‍प्रदान‍ करने‍के‍जलए‍जाकजुत‍दकए‍गए‍ू।ैं ईपयजग‍पररुर ऄनुमजददत‍लेअईट‍यजजना‍में‍एक‍जाजिष्ट‍ईपयजग‍के‍जलए‍एक‍जाजिष्ट‍भूखंड‍या‍कजइ‍एक‍ुब‍जडाीजन‍या‍कइ‍ुब‍ जडाीजन।‍पररुर‍का‍भ-ू प्रयजग‍मास्ट्टर‍प्लान‍के‍अधार‍पर‍जनधावररत‍दकया‍जाना‍ू।, ईपयजग‍जजन मास्ट्टर‍प्लान‍म‍ेंप्रााधान‍के‍ऄनुुार‍िूरी‍कायों‍की‍दकुी‍भी‍जनर्ददष्ट‍ईपयजग‍श्रेणी‍के‍जलए‍कजइ‍क्षेत्र। ाी ईपयजगों‍की‍ार्टटकल‍जमलक्ुग एक‍भूखंड‍म‍ेंलंबात‍रूप‍ुे‍प्रजतबंजधत‍पररजस्ट्थजतयों‍म‍ेंपूचान‍दकए‍गए‍ईपयजग‍पररुरों‍की‍ार्टटकल‍जमलक्ुग‍प्रााधान। डब्ल्य ू पद, ल‍चलन‍ेयजग्य‍पथ‍(ाॉक,जबजलटी) ाॉक,जबजलटी‍ईु‍ुीमा‍का‍एक‍मानदंड‍ू‍, जजु‍तक‍जनर्नमत‍ााताारण‍(बाधा‍मुि , ुुरजक्षत, ुुप्रकाजित, अरामदायक‍ अदद)‍की‍जाजभन्न‍जािेीताओं‍के‍ऄनुुार‍एक‍क्षेत्र‍चलने‍यजग्य‍ूजता‍ू‍,और‍जाचाराधीन‍क्षत्रे ‍के‍ईु‍क्षेत्र‍म‍ेंाृक्षछाया‍ूज। ाॉक‍प्लान‍ प,दल‍यात्री‍और‍ुाआदकल‍चलाने‍की‍ऄाुंरचना‍के‍प्रााधान‍के‍ुाथ‍दकुी‍भी‍जाजिष्ट‍गंत्‍नजड‍के‍अुपाु‍कम‍ु‍े कम‍ 400-500 मीटर‍(5-10 जमनट‍की‍प,दल‍दरू ी)‍के‍जूस्ट्ुों‍के‍जलए‍त,यार‍की‍गइ‍यजजना।‍प,दल‍चलने‍की‍यजजना‍के‍तूत‍ क्षेत्र‍का‍ाास्ट्तजाक‍जनधावरण‍पडे -िेड‍और‍/‍या‍ाांजछत‍लाआनों‍पर‍अधाररत‍ूजगा। जल‍ुां दे निील‍िूरी‍जडजाआन‍(डब्ल्यएू ुयडू ी) एक‍एप्रजच,‍जजुमें‍िूरी‍जनयजजन‍(जल‍अपूर्नत, ऄपजिष्ट‍जल, ाीावजल‍और‍भूजल‍प्रबंधन‍ुजूत)‍के‍प्रबंधन, ुंरक्षण‍और‍ बचाा‍के‍ुाथ‍िूरी‍जनयजजन‍कज‍आु‍प्रकार‍एकीकृत‍दकया‍गया‍ूज, तादक‍िूरी‍जल‍प्रबंधन‍प्राकृजतक‍जल‍जाज्ञान‍और‍ पाररजस्ट्थजतक‍प्रदक्रयाओं‍के‍ऄनरूु प‍ूज। श्रजमक‍अााु श्रजमक‍अााु‍ु‍े दकुी‍्जि ‍के‍अााुीय‍ईपयजग‍के‍जलए‍ऄस्ट्थायी‍या‍जनधावररत‍ुमय‍के‍रूप‍ु‍े प्रयजग‍म‍ें लाइ‍जान‍े ााली‍ुंपजि‍ऄजभप्रेत‍ू‍, जज‍दकुी‍भी‍ईच्च‍कुिल, कुिल, ऄधव-कुिल‍या‍ऄकुिल, म,नुऄल, तकनीकी‍या‍जलजपकीय‍काय‍व[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 311 करन‍े के‍जलए‍जनयजजजत‍ू,, लेदकन‍आुम‍ें ऐुा‍कजइ‍भी‍्जि ‍िाजमल‍नूीं‍ू‍, जज‍मुख्य‍रूप‍ुे‍प्रबंधकीय‍या‍पयवाेक्षी‍या‍ प्रिाुजनक‍क्षमता‍में‍कायवरत‍ूज।‍यू‍अााु‍कायवस्ट्थ‍ ल‍पर‍या‍कायवस्ट्थ‍ ल‍ुे‍ऄलग‍ूज‍ुकता‍ू,, और‍आुमें‍अााुीय‍ आकाइ‍ या‍ ियनकक्ष‍ ूज‍ ुकते‍ ू।ैं ‍ श्रजमक‍ अााु‍ स्ट्थलों‍ में‍ पयावप्त‍ पानी‍ की‍ अपूर्नत‍ और‍ स्ट्ाच्छता‍ ुुजाधाएं‍ और‍ अपातकालीन‍जचदकत्ुा‍ुूायता, क्रेच‍अदद‍ज,ुी‍ऄन्य‍ुुजाधाएं‍िाजमल‍ूोंगी। जडे जडे -फार्ममग जेड-फार्ममग‍या‍जीरज-एकड़‍खेती,‍कृजी‍का‍एक‍रूप‍ू‍, जूां‍ऐुी‍गजतजाजध‍के‍जलए‍ऄलग‍भूजम‍की‍अाश्यकता‍नूीं‍ूजती‍ ू।, ‍आुमें‍ऄन्यथा‍ऄप्रयुि , ग,र-पारंपररक‍स्ट्थानों‍ज,ु‍े छतों, घर‍के‍ऄंदर,‍भानों‍के‍भीतर‍उ्ाावधर‍स्ट्थान‍अदद‍का‍ईपयजग‍ दकया‍जाता‍ू।, जजनल‍जाकाु‍यजजना ददल्ली‍राष्ट्रीय‍राजधानी‍क्षेत्र‍के‍एक‍क्षेत्र‍(प्रभाग)‍के‍जलए‍एक‍यजजना‍जजुमें‍ुामाजजक‍ऄाुंरचना,‍पाकों‍और‍खलु ‍े स्ट्थानों, ुंचलन‍प्रणाली, अदद‍के‍प्रााधान‍की‍जास्ट्ततृ ‍जानकारी‍ू।, ददल्‍ली मुख्य‍ ‍यजजना-2041‍का‍ड्राफ्ट‍पाठ‍दस्ट्‍तााेज‍और‍भूजम‍ईपयजग‍प्ल‍ ान‍ईपयक्ुव त‍ ‍ऄाजध‍के‍दौरान‍ुभी‍कायव‍ददाुों‍ में‍ररुेप्‍िन‍डेस्ट्‍क‍जाकाु‍मीनार, अइ.पी.‍एस्ट्‍टेट, नइ‍ददल्ल‍ ी-11002‍पर‍ईपलब्ध‍ ‍रूगे ा।‍यू‍जनम्न‍ जलजखत‍ललक‍ऄथावत‍् https://dda.org.in/hotlinks.aspx पर‍भी‍ईपलब्‍ध‍रूगे ा। [फा.‍ुं.‍18(15)/2021-एमपी] डी.‍ुरकार, अयुक्‍त‍एां‍ुजचा ऄनलु ग्नक ऄनलु ग्नक‍1:‍प्रजतबजं धत‍/‍ईद्यजगों‍की‍नकारात्मक‍ुचू ी जनम्नजलजखत‍जाजनमावण‍करन‍े ााले‍ईद्यजगों‍कज‍राष्ट्रीय‍राजधानी‍क्षेत्र‍ददल्ली‍के‍भीतर‍प्रजतबंजधत‍दकया‍जाएगा।‍2 (ूालााँदक, पयावारण‍ जाभाग, जीएनुीटीडी, ईद्यजग‍ जाभाग, जीएनुीटीडी‍ के‍ परामिव‍ ु,े दकुी‍ जािेी‍ गजतजाजध/ईद्यजग/कारखान‍े का‍पता‍लगाने‍के‍जलए‍ऄंजतम‍जनणवय‍लगे ा, जज‍ुीपीुीबी‍द्वारा‍जनधावररत‍मापदडं ों/ितों‍के‍ ऄनुुार‍और‍डीपीुीुी‍द्वारा‍ऄपनाया‍गया‍ू।, ) 1. अकव‍/‍आंडक्िन‍फनेु 2. ऄम्ल 3. क्षार 4. पिु‍और‍मछली‍के‍तले 5. एजल्डूाआड 6. एजुड‍घजल 7.‍एजुटलाआड्ु, दफएरटडाआन, अयजडजफॉम,व क्लजरजफॉम,व इ-नेफथजल, अदद312 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 8. ऄमजजनयम‍ ुल्फॉनाजनाआड,‍ अुेजनक‍ और‍ आुके‍ यौजगकों,‍ बेररयम‍ काबोनेट,‍ बेररयम‍ ुाआनाआड,‍ बेररयम‍ आथाइल्ुलु फेट,‍बेररयम‍एुीटेट‍जुनेबार,‍कॉपर‍ुल्फजफाआड,‍फेरजजुनेुाआड,‍ूाआड्रज‍ुाआनाआड, ूाआड्रज‍ुाआनाआड‍एजुड,‍ पजटेजियम‍बायजक,लेट, पजटेजियम, ुाआनाआड, पजटाि‍का‍प्रिुन,‍दफनीगलक‍एजुड, जुल्ार‍ुाआनाआड 9. जामान‍जनमावण 10. बुचड़खाने, पिु‍रि ‍प्रुंस्ट्करण‍(मौजूदा, पुनाावु‍1 (और‍नाीनतम‍तकनीक‍के‍ुाथ‍अधजु नक‍बूचड़खाने‍कज‍छजड़कर), ुंबंजधत‍एजेंजुयों‍ुे‍ुभी‍मंजूरी‍के‍ऄधीन, और‍आु‍ुंबंध‍में‍राष्ट्रीय‍ूररत‍न्यायाजधकरण‍के‍अदेि‍का‍ऄनुपालन‍करन‍े की‍ ऄनुमजत‍दी‍जाएगी)।‍ये‍एनुीटी‍ददल्ली‍की‍अाश्यकता‍पर‍कड़ाइ‍ुे‍जनभवर‍ूोंगे‍जजनका‍जनधावरण‍ुंबंजधत‍स्ट्थानीय‍ जनकाय/प्राजधकरण‍द्वारा‍दकया‍जाएगा। 11. जबटुमन‍ब्लजआंग‍(गम)व 12. ईंट‍भट्ठा‍(कच्च‍ेमाल‍के‍रूप‍में‍ुाफ‍जमट्टी‍का‍ईपयजग, ईंधन‍के‍रूप‍म‍ेंकजयला) 13. बी-नेप्थजल 14. ब,क्लाआट‍पाईडर‍(फॉमवलाजडूाआड‍ुे‍िुरू) 15. बारले‍माल्ट‍और‍ऄकव 16. ऄजस्ट्थ-जग्रस्ट्त, ऄजस्ट्थ-भजजन, ूजड्डयों‍की‍ुालल्टग, ूजड्डयों‍का‍खुला‍भाग, ूजड्डयों‍का‍ुूखना 17. ूड्डी‍का‍चारकजल‍जनमावण 18. ब्लास्ट्ट‍फनेु‍-‍कजयला‍फायड व 19. ुाआदकलें‍(एकीकृत‍ुंयंत्र) 20. ब्रेारी‍और‍पजटेबल‍जस्ट्परीट‍2 (ूालांदक, 500 लीटर/ददन‍की‍क्षमता‍तक‍के‍माआक्रजब्रेारीज‍कज‍दकुी‍भी‍ रेस्ट्तरां/ूजटल/क्लब‍में‍स्ट्थाजपत‍करने‍की‍ऄनुमजत‍दी‍जा‍ुकती‍ू,, जज‍ुाआट‍पर‍ऄपजिष्ट‍जल‍ईपचार‍ुुजाधा‍की‍स्ट्थापना‍ के‍ऄधीन‍ू,, और‍ऄन्य‍ुभी‍जाजनयामक‍अाश्यकताओं‍के‍ऄनुपालन‍म‍ेंू।ैं ) 21.‍क्लजरीन‍युि ‍प,रादफन‍मजम‍िजधन 22.‍काबवन‍ब्ल,क 23.‍ुीमेंट‍ईद्यजग 24.‍क,जल्ियम‍काबावआड, फॉस्ट्फजरु, एल्यूमीजनयम‍धलू ‍पेस्ट्ट‍और‍पाईडर, तांबा, जस्ट्ता, अदद‍(आलेक्रजथमलव ‍आंडस्ट्रीज) 25.‍क्रेन, ूॉआस्ट्ट‍(उपर‍ईठान‍ेका‍यंत्र)‍और‍जलफ्ट‍(ऄुेंबली‍कज‍छजड़कर) 26.‍ुामान्य‍औद्यजजगक‍मिीनरी‍(ज,ुे‍ूाआड्रजजलक‍ईपकरण, जड्रललग‍ईपकरण, बॉयलर, अदद) 27.‍डीओपी‍(जडयजक्टाआल‍फथालेट), डीबीपी और‍प्लाजस्ट्टुाआज़र 28.‍ड्राइ‍ुेल‍ब,टरी 29.‍डाइ‍और‍डाइ‍आनमीडीआट‍ 30.‍लकड़ी‍की‍अुान, लकड़ी‍की‍राुायजनक‍काष्ठ‍‍ुंिजीण‍(प्राकृजतक‍काष्ठ‍‍ुंिजीण‍कज‍छजड़कर) 31.‍जास्ट्फजटक, यानी, पटाखे, गनपाईडर, गनकॉटन, अदद।‍ 32.‍ऄथ‍वमूलाग‍मिीनरी‍/‍ईपकरण‍(ऄुेंबली‍का‍जनमावण)‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 313 33.‍जबजली‍के‍तार‍और‍केबल‍(100‍ुे‍ऄजधक‍कमवचारी, 2000‍ागवमीटर‍भूखंड) 34.‍फ,टी‍एजुड 35.‍काकनािी‍और‍कीटनािक 36.‍फ्लेक्ुजग्रदफक‍आंक 37.‍ईंधन‍तेल, आल्यूमीनेरटग‍और‍ऄन्य‍तले ‍ज,ु‍ेदक‍स्ट्ट,रटक‍तेल, िजयल‍तेल, लुजब्रकेंट्ु 38.‍1‍[फाईंड्रीज‍(कपजला‍फनुे )‍*] 39.‍ग,ु‍कम्प्रेुर 40.‍ग्रेफाआट‍ईत्पादन 41.‍ग्लाु‍फनेु‍(1‍टन‍/‍ददन‍ुे‍ऄजधक‍क्षमता) 42.‍ग,ु-काबवन-जडुल्फाआड, ऄल्रामरीन‍ब्ल,ू क्लजरीन, ूाआड्रजजन, ुल्फर‍डाआऑक्ुाआड, एजुरटलीन, अदद‍(एलपीजी‍/‍ ुीएनजी‍/‍ऑक्ुीजन‍/‍जचदकत्ुा‍ग,ुों‍के‍ऄलााा) 43.‍ग्लेंडयलू र/‍ग्लड्ें ु‍एक्ुरेक्िन 44.‍ूजड्डयों‍और‍मांु‍ुे‍ग्ल‍ू और‍जजलेरटन 45.‍ूॉट‍जमक्ु‍प्लांट‍(डीपीुीुी/ुीपीुीबी‍द्वारा‍ऄनुमजददत‍लजगों‍कज‍छजड़कर) 46. खतरनाक‍ऄपजिष्ट‍प्रुंस्ट्करण‍ज,ुे‍ऄस्ट्पताल/2 [तृतीयक‍स्ट्ाास्ट््य‍देखभाल‍केन्द्र]/‍जचदकत्ुा‍/‍ईद्यजग‍ऄपजिष्ट।‍ 3[ूालांदक, नाीनतम‍तकनीक‍के‍ुाथ‍अधुजनक‍खतरनाक‍ऄपजिष्ट‍प्रुंस्ट्करण‍ुंयंत्र‍कज‍ऄनुमजत‍दी‍जाएगी, बिते‍दक‍ ुभी‍प्रकार‍की‍क्लीयरेंु, पयावारणीय‍क्लीयरेंु‍ुजूत, ुंबंजधत‍एजेंजुयों‍ु‍े क्लीयरेंु‍प्राप्त‍की‍गइ‍ूज‍और‍आु‍ुंबंध‍म‍ें राष्ट्रीय‍ूररत‍न्यायाजधकरण‍के‍अदेिों‍का‍ऄनुपालन‍दकया‍गया‍ूज।‍ये‍राष्ट्रीय‍राजधानी‍क्षत्रे ‍ददल्ली‍की‍अाश्यकता‍पर‍ ुख्ती‍ुे‍जनभवर‍ूजगा‍जजुका‍जनधावरण‍स्ट्थानीय‍जनकाय/प्राजधकरण‍द्वारा‍दकया‍जाएगा)। 47. पॉल्यूररथीन‍फजम 48. औद्यजजगक‍जजलेरटन,‍नाआरज‍जग्लुरीन‍और‍फुलजमनेट 49. लौू‍/‍आस्ट्पात‍धातु‍फजर्मजग‍(न्यूमेरटक‍ूथौड़ा‍का‍ईपयजग‍करके)। 50. औद्यजजगक‍जजलेरटन, नाआरज‍जग्लुरीन‍और‍फुलजमनेट 51. औद्यजजगक‍रक, रेलर‍अदद। 52. रेखीय‍एल्केड‍बेंजीन 53. जद्वतीयक‍ुीुा‍ईद्यजग‍ुजूत‍प्रमुख‍जाजनमावण (ऄपजिष्ट‍स्ट्क्र,प‍ुे‍ुीुा‍की‍ररक्वरी) 54. चूना‍भट्ठा। 55. चमड़े‍की‍ट,लनग‍और‍रंगाइ‍(कच्ची‍खाल‍/‍जस्ट्कन‍टू‍ुेमी‍दफजनि) 56. लजकजमजरटा‍और‍ाग, जन 57. मेथनॉल 58. जमथाआलेटेड‍जस्ट्प्रट 59. म,केजनकल‍स्ट्टजन‍क्रिर‍और‍मजटे‍रेत‍की‍धलु ाइ314 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 60. लुगदी‍और‍कागज‍का‍जाजनमावण 61. मेलामाआन‍रेजुन 62. खजनज‍लाण‍(जजुमें‍एजुड‍का‍ईपयजग‍ूजता‍ू:,‍CuSO4, FESO4, दफटकरी‍अदद) 63. डीजल‍आंजन,‍जनरेटर‍का‍जाजनमावण, ऄुेंबली‍कज‍छजड़कर‍ 64. मजटर‍ुाआदकल, स्ट्कूटर, कार, टेम्पज, रक‍आत्यादद। 65. न्यूज‍लप्रट‍मन्, युफ,क्चररग, पलल्पग, फ्रेि‍पेपर‍मेककग 66. यौजगकों‍के‍जलए‍ईावरकों‍के‍जमश्रण‍कज‍छजड़कर‍नाआरजजनी‍और‍फॉस्ट्फेरटक‍ईावरक‍(बड़े‍प,माने‍पर) 67. काबवजनक‍जालायक, क्लजरीनयुि ‍खजनज, मेथनॉल, एजल्डूाआड, जमथाआलेटेड‍जस्ट्प्रट 68. पेरजजलयम‍कजक‍प्रुंस्ट्करण, ईंधन‍के‍रूप‍म‍ेंनूीं 69. पॉटरीज‍/‍रीफ्र,क्टरीज‍(कजयले‍या‍भट्टी‍के‍तले ‍का‍ईपयजग‍करके) 70. रेजजन‍ुजूत‍पॉजलथीन‍पॉजलमर 71. पेंट‍ईद्यजग‍(नाआरज‍ुले ूलजज़‍और‍ऄल्केड‍रेजुन‍अधाररत) 72. प्लाजस्ट्टुाआज़र‍जनमावण 73. जपराजमड 74. फेनॉल‍फॉमलव ाजडूाआड‍रेजुन‍और‍पाईडर 75. पजुवलेन‍के‍ईत्पाददत‍बतवन‍(प्रजत‍ददन‍2‍टन‍ुे‍ऄजधक‍ईत्पादन‍क्षमता‍के‍कजयल‍े का‍ईपयजग‍करके) 76. रबड़‍ुजल्यिू न‍और‍जथनर‍(नेप्था‍और‍रबर‍स्ट्क्र,प‍का‍ईपयजग‍करके) 77. जमश्रण‍के‍ऄयस्ट्क‍ुल्फाआड‍ऑक्ुाआड‍की‍रजलस्ट्टग 78. रेयान‍फाआबर‍जाजनमावण 79. रीफ्र,क्टरीज 80.‍रबर‍का‍पुनग्रवूण। 81. टायर‍और‍ट्डूब‍का‍ईत्पादन‍(ऄामूल्यन) 82. ुच्चराआन 83. मा्यजमक‍लजक‍ईद्यजग 84. लुथेरटक‍रबड़ 85. स्ट्मेलरटग‍(गलाना) 86. जुलाइ‍मिीन‍ें (एकीकृत‍आकाआयां)‍ऄुेंबली‍कज‍छजड़कर 87. स्ट्लुआु‍गेट्ु‍और‍जगयर 88. स्ट्टेनलेु‍स्ट्टील‍जपलक्लग[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 315 89. स्ट्टीम‍आंजन 90. स्ट्टील‍पाआप‍और‍ट्डूब‍(जनरंतर‍ाेल्डेड‍/‍ुीमलेु) 91. चीनी, खाडं ‍ुरी 92. ुजजडयम‍जुजलकेट‍ईद्यजग‍(1‍टन‍/‍ददन‍ुे‍ऄजधक) 93. पत्थर‍की‍खदान 94. कपड़ा‍(ुभी‍जिफ्टों‍म‍ें100‍ुे‍ऄजधक‍श्रजमक, एक‍एकड़‍भूजम, 100‍एलकेडी‍पानी) 95. थजररयम, रेजडयम‍और‍आुी‍तरू‍के‍अआुजटजप‍और‍रेयर‍ऄथ‍व की‍ररकारी 96. टबावआन 97. यूररया‍और‍दफनाआल‍फॉमजव ल्डूाआड‍रेजुन 98. ानस्ट्पजत‍तेल‍ूाआड्रजजेनरेटेड 99. ऄपजिष्ट‍(कच्चा‍/‍जला‍ुएअ)‍तले ‍प्रुंस्ट्करण‍(ररफाआनरी) नजटः i. उपर‍ईजल्लजखत‍दकुी‍भी‍गजतजाजध‍में‍िाजमल‍दकुी‍भी‍ुाावजजनक‍ईपयजजगता‍ुेाा‍कज‍पयावारण‍कानूनों‍की‍ितों‍के‍ ऄधीन‍ऄनुमजत‍दी‍जाएगी। ii. अगे‍यदद‍ऐुा‍करन‍े के‍जलए‍केंद्र‍ुरकार‍द्वारा‍ईजचत‍और‍ुाावजजनक‍जूत‍में‍माना‍जाता‍ू,, तज‍जनजीद्ध‍ईद्यजगों‍की‍ ुूची‍में‍और‍परराधवन/पररातवन‍दकए‍जा‍ुकते‍ू।ैं iii. ूालांदक, दकुी‍भी‍प्रकार‍की‍भट्‍ठी‍की‍जनरंतरता‍ुीपीुीबी‍और‍डीपीुीुी‍के‍जनधावररत‍मापदंडों‍के‍भीतर‍ूजगी। ऄनलु ग्नक 2: ूरे‍और‍नील‍ेरंग‍की‍ुपं दा‍का‍जाजिष्ट‍ागीकरण प्राकृजतक‍और‍मौजदू ा‍ग्रीन‍ब्ल‍ूुपं दा‍ भजू म-अधाररत o ऄरााली‍(ररज), क्षेत्रीय‍पाकव, अरजक्षत‍ान o ुंरजक्षत‍ान o िूरी‍ान o ज,ा‍जाजाधता‍पाकव o प्राकृजतक‍नालों‍और‍जल‍जनकायों‍के‍बफर o पुराताजत्ाक‍पाकव‍और‍ऐजतूाजुक‍स्ट्मारकों‍के‍ग्रीन o ुरकारी‍एजेंजुयों‍द्वारा‍प्राकृजतक‍ुुरक्षा‍/‍ुंरक्षण‍के‍जलए‍क्षेत्रों‍की‍पूचान‍की‍गइ जल-अधाररत o यमुना‍नदी‍और‍आुका‍बाढ़‍का‍म,दान o ड्रेनेज‍मास्ट्टर‍प्लान‍2018‍के‍ऄनुुार‍ुभी‍प्राकृजतक‍नाजलया ं o दलदल‍और‍अद्र‍वभूजम o झीलों‍ुजूत‍जल‍जनकाय‍(1‍ूक्े टेयर‍और‍ईुुे‍उपर) o बााली‍(कुए)ं ‍और‍टैंक‍(ददल्ली‍की‍ऐजतूाजुक‍जल‍प्रणाली‍का‍जूस्ट्ुा)316 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] जनयजजजत‍ूरे‍नील‍ेुपं दा‍और‍ऄन्य‍मनजरंजक‍क्षत्रे o ुभी‍पदानुक्रमों‍के‍जनयजजजत‍पाकव‍और‍खलु ‍े स्ट्थान‍-‍क्षेत्रीय, िूर, जजला, ुमुदाय, पड़जु, अााु‍क्षेत्र, टजटल‍ लॉट, बुएईद्देिीय‍म,दान, गजल्फ‍कजुव‍और‍खले ‍के‍मद, ान।‍(कुछ‍बड़े‍पाकव‍ददल्ली‍म‍ेंुंरजक्षत‍ानों‍का‍जूस्ट्ुा‍ू)ैं o खेल‍केंद्र‍/‍पररुर, गजल्फ‍कजुव o बगीचे, पौधे‍नुवरी o प्राणी‍ईद्यान‍और‍ानस्ट्पजत‍ईद्यान o जूलॉजजकल‍पाकव‍और‍बॉटजनकल‍गाडवन्ु जनर्नमत‍आमारतों‍के‍भीतर‍ऄन्य‍ूरे‍नील‍ेरंग‍की‍ुपं दा o जनजी‍ईद्यान, अंगन, छत‍ईद्यान, पूल, अंतररक‍स्ट्रीट‍अदद। o ुंस्ट्थागत‍/‍ुरकारी‍पररुरों‍म‍ें जचजन्ूत‍बड़े‍ूरे‍क्षेत्र o रीजेनरेिन‍/‍टीओडी‍यजजनाओं‍के‍मा्यम‍ुे‍जनर्नमत‍ुाावजजनक‍ग्रीन‍स्ट्पेु‍ o भूतल‍/‍खलु ‍ेपार्ककग‍क्षेत्र, ुाावजजनक‍प्लाज़ा o बंद‍औद्यजजगक‍ुम्पदा‍म‍ेंऄजनाायव‍ूररत‍क्षेत्र o एलबीजेड में‍ऄजनाायव‍ूररत‍क्षत्रे o एचटी‍लाआनों‍/‍तेल‍पाआपलाआनों‍/‍ऄन्य‍ुेााओं‍के‍ऄजनाायव‍बफुव o फ्लाइओार‍के‍नीचे‍खाली‍स्ट्थान, पानी‍के‍मख्ु य‍मागों‍के‍ुाथ, रेलाे‍लाआनों‍के‍ुाथ, अदद। o जड़ी‍बूटी, मुाला‍ईद्यान, ग्रीनूाईु। o ुड़कों‍के‍ुेंरल‍भाग‍पर‍ाृक्षारजपण, ुड़कों‍और‍ुड़कों‍के‍दकनारे‍ाृक्षों‍का‍अारण नइ‍और‍ुभं ाजात‍िूरी‍स्ट्तर‍ग्रीन‍ब्ल‍ूुपं दा o पररत्यि ‍खदान‍और‍क्व,रीज,‍जबजली‍ुंयंत्र‍और‍भूजम‍भराा‍स्ट्थल‍/‍पनु र्ननर्नमत‍भूजम o प्राकृजतक‍नाजलयों‍के‍नए‍जाकजुत‍बफर o ूररत‍जाकाु‍क्षेत्र *डीडीए‍द्वारा‍ुमय-ुमय‍पर‍पूचानी‍गइ‍ऄन्य‍पररुंपजियों‍कज‍जजड़कर‍ुूची‍कज‍बढ़ाया‍जा‍ुकता‍ू, ऄनलु ग्नक 3: ददल्ली‍म‍ेंजनयजजजत‍औद्यजजगक‍क्षत्रे ों‍की‍ुचू ी (एमपीडी‍2021 ु‍ेजनकाला‍गया) औद्यजजगक‍ईपयजग‍जजन‍म‍ेंजनम्नजलजखत‍स्ट्थानों‍पर‍औद्यजजगक‍गजतजाजध‍का‍ुंचालन‍दकया‍जाएगा, ज,ुा‍दक‍भूजम‍ईपयजग‍ यजजना‍में‍आंजगत‍दकया‍गया‍ूः, जजन‍ए‍ु‍ेएच 1. नारायणा‍औद्यजजगक‍क्षत्रे , 2. झंडेाालान‍फ्ल,टेड‍फ,क्री, 3. मजजतया‍खान‍यजजना, 4. डीुीएम‍फ्ल,टेड‍फ,क्री‍कॉम्प्लक्े ु, 5. िूजादा‍बाग‍औद्यजजगक‍क्षत्रे , 6. गुलाबी‍बाग‍औद्यजजगक‍क्षत्रे , 7. राजस्ट्थान‍ईद्यजग‍नगर‍जूााँगीरपुरी‍के‍पाु‍जी.टी.‍रजड़, 8. एुएमए‍कज-ऑप.‍औद्यजजगक‍एस्ट्टेट‍जूााँगीरपरु ी‍के‍पाु‍जी.टी.‍रजड़, 9. एुअइएुअइ‍औद्यजजगक‍क्षेत्र‍जूांगीरपुरी‍के‍पाु‍जी.टी.‍रजड़,[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 317 10. राणा‍प्रतापबाग‍के‍पाु‍ जी.टी.‍करनाल‍रजड‍औद्यजजगक‍क्षेत्र, 11. लूदस्ट्ु तान‍प्रीफ,ब‍जलजमटेड,‍जिााजी‍रेलाे‍स्ट्टेिन‍के‍पाु‍औद्यजजगक‍क्षेत्र‍(लमटज‍रजड), 12. ओखला‍औद्यजजगक‍क्षेत्र‍फेु‍I,‍II और‍III, 13. मजून‍कज-ऑप‍औद्यजजगक‍क्षत्रे , 14. मजदी‍फ्लजर‍जमल्ु‍के‍पाु‍एुअइएुअइ‍कॉम्प्लेक्ु‍ओखला, 15. जखीरा‍के‍पाु‍नजफगढ़‍रजड‍औद्यजजगक‍क्षत्रे , 16. कीर्नत‍नगर‍औद्यजजगक‍क्षत्रे ,‍मायापुरी‍फेु‍I‍और‍II, 17. ईद्यजग‍नगर‍रजूतक‍रजड, 18. जाकाुपुरी‍के‍पाु‍केिा‍पुर‍लेदर‍तन्नेरी‍यजजना‍(ुर्नाु‍ुेंटर‍का‍जूस्ट्ुा),‍ 19. ाजीरपुर‍औद्यजजगक‍क्षेत्र, 20. लॉरेंु‍रजड‍औद्यजजगक‍क्षेत्र, 21. मंगजल‍पुरी‍औद्यजजगक‍क्षेत्र‍फेु‍I‍और‍II, 22. जझलजमल‍औद्यजजगक‍क्षेत्र, 23. पटपड़गंज‍औद्यजजगक‍क्षेत्र, 24. फ्रेंड्ु‍कॉलजनी‍औद्यजजगक‍क्षेत्र, 25. नरेला‍औद्यजजगक‍एस्ट्टेट, 26. बााना‍औद्यजजगक‍एस्ट्टेट, 27. कंझााला‍औद्यजजगक‍एस्ट्टेट, 28. पीाीुी‍बाजार‍रटकरी‍कलां, 29. बादली 30. भजरगढ़ क. िूरी‍जास्ट्तार‍क्षेत्रों‍के‍जलए‍यजजना‍त,यार‍करत‍े ुमय‍ऄजतररि ‍औद्यजजगक‍क्षेत्रों‍कज‍आंजगत‍दकया‍जाएगा। ख. ऄनुमजददत‍काय-व ुू-ईद्यजग‍केंद्र, ुेाा‍केंद्र‍अदद, जूां‍भूजम‍ईपयजग/पूले‍के‍मास्ट्टर‍प्लान‍के‍ऄनुुार‍जाकाु‍ दकया‍गया‍ू,, औद्यजजगक‍ूजना‍जारी‍रूगे ा, जज‍जनधावररत‍प्रााधानों‍की‍ितों‍के‍ऄनुरूप‍ूजगा। ऄनलु ग्नक 4: घरेल‍ूईद्यजग 1. ऄगरबिी‍और‍आुी‍तरू‍के‍ईत्पाद 2. एल्यूमीजनयम‍ूगैं र‍(ाायर‍ड्राआंग‍और‍एनजडाआलजग‍कज‍छजड़कर)। 3. अयुाेददक‍/‍ूजम्यजप,जथक‍/‍यूनानी‍दााएं। 4. आलेक्रॉजनक‍ुामानों‍की‍ऄुेंबली‍और‍मरम्मत। 5. जुलाइ‍मिीनों‍की‍ऄुेंबली‍और‍मरम्मत। 6. ूाथ‍ईपकरण‍की‍ऄुेंबली। 7. ब,डलमटन‍िटलकॉक‍की‍ऄुबें ली। 8. जबजली‍के‍ग,जेट्ु, कूलर‍/‍ूीटर‍अदद‍की‍ऄुेंबली‍और‍मरम्मत। 9. ऄुेंबली‍और‍टाआपराआटर‍की‍मरम्मत‍(फ्रंट‍कालस्ट्टग‍कज‍छजड़कर)। 10. ब,केलाआट‍जस्ट्ाच‍की‍ऄुेंबली।318 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 11. मापने‍के‍ईपकरणों‍की‍ऄुेंबली‍और‍मरम्मत‍(मकवरी‍और‍खतरनाक‍ुामजग्रयों‍कज‍ुंभालन‍े के‍ऄलााा)।‍ 12. अट्टा‍चक्की। 13. बारटक‍कायव। 14. ब्लॉक‍मेककग‍और‍फजटज‍बड़ा‍करना। 15. जबस्ट्कुट, पापे, केक‍और‍कुकीज‍बनाना। 16. बटन‍बनाना, बटन‍और‍ुएक‍कज‍ठीक‍करना। 17. बुकबाआंलडग। 18. ब्रि‍और‍झाड़‍ू(ूाथ‍ुे)। 19. केजलकज‍और‍ास्त्र‍ईत्पाद। 20. बेंत‍और‍बांु‍के‍ईत्पाद। 21. क,ुेट‍ररकॉर्मडग। 22. प्लास्ट्टर‍ऑफ‍पेररु‍के‍ुाथ‍क्ले‍और‍मॉडललग। 23. कॉयर‍और‍जूट‍ईत्पाद। 24. काडवबजडव‍बॉक्ु। 25. मजमबजियााँ। 26. तााँबा‍और‍पीतल‍अटव‍ाेयर। 27. डजररयााँ,‍रस्ट्ुी‍और‍ुुतली‍बनाना। 28. बढ़इ। 29. कॉन्ट,क्ट‍लेंु। 30. क,नााु‍ब,ग‍और‍ूजल्ड-ऑल‍मेककग। 31. कैंडी, जमठाइ, रुमलाइ‍अदद‍(जब‍जडब्बाबंद‍न‍ूज)। 32. कपाु‍/‍रेिम‍छपाइ‍(ूाथ‍ुे)। 33. कंप्यूटर‍मरम्मत‍और‍ुाआबर‍ुूचना‍केंद्र। 34. कंप्यूटर‍ुॉफ्टाेयर। 35. दारी‍और‍कालीन‍बुनाइ। 36. जडटजेंट‍(जबना‍भट्टी‍के)। 37. डाटा‍प्रजुेलुग। 38. डेयरी‍ईत्पाद‍ईदाूरण‍क्रीम,‍घी,‍पनीर, अदद। 39. ड्राइ‍क्लीलनग‍(बड़ी‍कायविालाओं‍कज‍छजड़कर)। 40. डेस्ट्क‍टॉप‍पजब्ललिग। 41. कढ़ाइ। 42. एनामेललग‍जाटरु‍(कजयल‍ेके‍ईपयजग‍के‍जबना)। 43. तस्ट्ाीरों‍और‍दपवणों‍की‍फ्रेलमग। 44. फाईंटेन‍पेन, बॉल‍पेन‍और‍फेल्ट‍पेन। 45. ुजना‍और‍चांदी‍का‍धागा, कालाबट्टू। 46. ूजजरी‍ईत्पाद‍(रंगाइ‍और‍ब्लीलचग‍के‍जबना)। 47. ूट्, ु,‍टजपी,‍कढ़ाइ‍ुजूत‍पगड़ी[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 319 48. ुूचना‍प्रौद्यजजगकी‍ुक्षम‍ुेााएं 49. फाईंटेन‍पेन‍के‍जलए‍स्ट्याूी‍बनाना। 50. आंटरलॉककग‍और‍बटलनग। 51. अभूीण‍का‍ुामान। 52. खादी‍और‍ूथकरघा। 53. खुस्ट्तिीु। 54. बुनाइ‍का‍काम‍करता‍ू।, 55. फीता‍ईत्पाद। 56. चमड़े‍के‍जूते। 57. चमड़े‍के‍बेल्ट‍और‍बकल‍की‍ऄुेंबली‍(ूाथ‍ु)े 58. जनर्नमत‍चमड़ा‍और‍रेजक्ुन। 59. जमल्क‍क्रीम‍ुेपरेिन। 60. जूट‍ईत्पादों‍का‍जनमावण। 61. लबदी‍का‍जनमावण। 62. नेम‍प्लेट‍मेककग। 63. जनम्नजलजखत‍ास्ट्तओंु ‍का‍ईत्पादन। i.‍ब्लैंकज‍केक ii.‍ब्रि iii.‍कुल्फी‍और‍जमष्ठान। iv.‍क्रायजन। v.‍जम, ,‍जले ी‍और‍फल‍ुंरजक्षत‍करन‍े ााले‍ईत्पाद। vi.‍ुंगीत‍ााद्ययंत्र‍(मरम्मत‍ुजूत)। vii.‍लेु‍का‍काय‍व और‍पुंद।‍ viii. ुजााटी‍चमड़े‍का‍ुामान‍ज,ुे‍पुव,‍ूडैं बग, । ix.‍छजटे‍आलेक्रॉजनक‍ुामान 64. पेपर‍स्ट्टेिनरी‍अआटम‍और‍बुक‍बाआंलडग। 65. पीट‍ूट, ,‍फूलों‍की‍माला‍और‍जपच। 66. पी.ाी.ुी.‍ईत्पाद‍(ऄजधकतम‍एक‍मजलल्डग‍मिीन)। 67. पेपर‍मिीन। 68. आत्र‍और‍ुौंदयव‍प्रुाधन 69. फजटजुेरटग। 70. फजटजस्ट्टेट‍और‍ुाआक्लजस्ट्टाआललग। 71. रेखाजचत्रों‍कज‍बड़ा‍करन‍े ुजूत‍जचत्र‍की‍फजटज‍प्रजत। 72. िैंपू‍की‍प,केलजग। 73. ूये र‍ऑयल‍की‍प,केलजग। 74. ाादी, पापड़‍अदद‍त,यार‍करना। 75. कोंजडमेंट्ु, मुालों, मूंगफली‍और‍दाल‍अदद‍का‍प्रुंस्ट्करण।320 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 76. पान‍मुाला। 77. जमठाइ‍और‍नमकीन‍का‍ईत्पादन‍(एक‍टन‍/‍ददन‍ुे‍कम) 78. पेपर‍माच े 79. पेपर‍कप।‍प्लेट्ु,‍फाआल‍ेंकार‍और‍ल,टर‍पड, ‍(मुद्रण‍के‍जबना)। 80. फजटजग्राफी‍(जाकाु‍और‍मुद्रण)। 81. घजड़यााँ‍और‍दीाार‍घजड़यााँ‍की‍मरम्मत। 82. राखी‍बनाना 83. घरेलू‍जाद्यतु ‍ईपकरणों‍की‍मरम्मत। 84. रेडीमेड‍ास्त्र‍(जबना‍धजए)। 85. ुाआदकल‍की‍मरम्मत। 86. कंप्यूटर‍ूाडवाेयर‍की‍मरम्मत‍और‍ुंयजजन। 87. चमड़े‍और‍पीाीुी‍ुामग्री‍के‍ईपयजग‍कज‍छजड़कर‍ब,ग, ब्रीफकेु, ुूटकेु‍की‍मरम्मत। 88. जल‍मीटर, स्ट्टेबलाआजर, यूपीएु‍अदद‍की‍मरम्मत। 89. रबड़‍की‍मौूरें। 90. स्ट्टजन‍एनग्रेलाग। 91. खेल‍का‍ुामान‍/‍स्ट्पजट्ुव‍नेट। 92. ुर्नजकल‍बैंडेज‍रजललग‍और‍करटग। 93. स्ट्टजा‍पाआप,‍ुेफ्टी‍जपन‍और‍एल्यूमीजनयम‍बटन‍(ूाथ‍ुे‍प्रेु)। 94. जुल्ार‍फॉयल‍बनाना। 95. ुाड़ी‍का‍फॉल‍बनाना। 96. जूता‍लेु। 97. स्ट्टाम्प‍प,ड। 98. स्ट्क्रीन‍लप्ररटग। 99. दजी। 100. थ्रेड‍बॉल‍और‍कपाु‍भराा। 101. जखलौने‍और‍गुजड़या। 102. टाइ। 103. टमाटर‍केचप। 104. छाता‍(ऄम्ब्रेला)‍ऄुेम्बली। 105. बतवन‍धजन‍ेका‍पाईडर‍(केाल‍जमश्रण‍और‍प,केलजग)। 106. ाेलाेट‍कढ़ाइ‍ााल‍ेजूत‍े /‍िॉल। 107. ामेुेली‍(ुेजायां‍.या‍जाें)‍और‍म,करजनी। 108. लकड़ी‍की‍नक्कािी‍और‍ुजााटी‍लकड़ी‍का‍माल। 109. उन‍का‍गजला‍और‍लच्छे‍बनाना। 110. लकड़ी‍/‍काडवबजडव‍ज्ाले री‍बॉक्ु‍(जाभाग‍ुे‍ऄनापजि‍प्रमाणपत्र‍के‍ऄधीन)। 111. उन‍बुनाइ‍(मिीन‍के‍ुाथ)। 112. जरी‍जरदजजी।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 321 ऄनलु ग्नक 5: घरेल‍ूईद्यजग‍गाां ों‍म‍ेंऄनमु ये ‍(अबादी) 1. ब्ल,क‍जस्ट्मथ। 2. बेंत‍और‍बांु‍के‍ईत्पाद। 3. प्लास्ट्टर‍ऑफ‍पेररु‍के‍ुाथ‍क्ले‍और‍मॉडललग। 4. दरी‍/‍कालीन‍/‍ुाड़ी‍बुनाइ‍(रंगने‍और‍ब्लीलचग‍कज‍छजड़कर)। 5. रेदफ्रजरेिन‍द्वारा‍अआुक्रीम‍और‍पानी‍कज‍ठंडा‍करना।‍(जबना‍कजल्ड‍स्ट्टजरेज‍के) 6. स्ट्टजन‍एनग्रेलाग। 7. गााँा‍के‍बतनव ‍ईद्यजग‍(जबना‍भट्टी‍के)। 8. ग्राम‍तले ‍घनी। 9. लकड़ी‍पर‍नक्कािी‍और‍ुजााटी‍लकड़ी‍का‍माल। नजटः i. खतरनाक‍रुायनज‍का‍जाजनमावण, भंडारण‍और‍अयात‍जनयम, 1989 की‍ऄनुुूची‍I‍और/ऄथाा‍II‍और‍ ुाावजजनक‍देयता‍बीमा‍ऄजधजनयम, 1990‍के‍तूत‍ुूचीबद्ध‍रुायनों‍का‍भंडारण‍जनजीद्ध‍ूजगा। ii. भारत‍ुरकार‍के‍पयावारण‍और‍ान‍मंत्रालय‍द्वारा‍जनधावररत‍दकए‍गए‍ऄनुुार‍आकाआयों‍द्वारा‍दकुी‍भी‍प्रकार‍के‍ ईत्पन्न‍ूजने‍ााले‍जनस्ट्ुारण/ईत्ुजवन‍की‍ऄनुमजत‍नूीं‍दी‍जाएगी, और‍ये‍िजर/्ाजन‍मानकों‍का‍ुख्ती‍ुे‍ ऄनुपालन‍करेंगे। ऄनलु ग्नक‍6: िूरी-स्ट्तरीय‍ुर्दकट‍की‍ुकं ेतक‍ुचू ी  कजरजनेिन‍पाकव-िाूजूानाबाद  लाल‍दकला-ुएमायूाँ‍का‍मकबरा  पुराना‍दकला-राष्ट्रपजत‍भान  ुएमायूाँ‍मकबरा-ुफदरजगं ‍मकबरा  ुफदरजंग‍मकबरा-मूरौली  तुगलकाबाद-जूााँपनाू-मूरौली  मूरौली-ुुल्तान‍गढ़ी322 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ऄनलु ग्नक 7: स्ट्रीट‍जडजाआन‍जाजनयम िूर‍के‍जलए‍ुमग्र‍गजतिीलता, ुुरक्षा‍और‍पयावारणीय‍लक्ष्यों‍के‍अधार‍पर, जनम्नजलजखत‍जाजनयमों‍का‍पालन‍ुभी‍ ुड़कों‍की‍जडजाआन, जनष्पादन, प्रबंधन‍और‍रखरखाा‍के‍जलए‍दकया‍जाना‍चाजूएः 1‍ऄजधमान्य‍ुाावजजनक‍परराून‍ईपयजग‍कज‍बढ़ााा‍देनाः 1क.‍ुाावजजनक‍पारगमन‍और‍प,दल‍याजत्रयों‍के‍जलए‍मागों/ुड़कों‍कज‍ुमान‍ऄथाा‍ईच्च‍प्राथजमकता‍के‍जलए‍पनु ःुंयजजजत‍ ूजना‍चाजूए।‍ 1ख. ऄन्य‍ुाधनों‍के‍ईपयजग‍कज‍प्रजत्ुाजूत‍करने‍के‍जलए, ुाावजजनक‍ुड़कों‍और‍स्ट्थानों‍पर‍पार्ककग‍कज‍प्रजतबंजधत‍करें‍ ऄथाा‍जनजी‍ााूनों‍के‍जलए‍ईच्च‍पार्ककग‍िल्ु क‍कज‍लागू‍करें। 1ग. पीक/चरम‍्स्ट्तता‍ऄाजध‍के‍दौरान‍ईच्च‍्स्ट्तता‍ााले‍ााूनों‍(एचओाी)‍और‍कारपूल‍के‍जलए‍ुमर्नपत‍गजलया‍ाँ प्रदान‍करें। 1घ. पारगमन-ईन्मुख‍जमजश्रत‍भूजम‍ईपयजग‍प,टनव‍प्रदान‍करें‍और‍जूााँ‍कूीं‍भी‍ऄनुमजत‍ूज, एमअरटीएु‍स्ट्टॉप‍की‍प,दल‍ दरू ी‍के‍भीतर‍िूर‍कज‍रीडेन्ुीफाइ‍करें। 2. जडजाआन‍द्वारा‍ुभी‍ुड़क‍ईपयजगों‍की‍ुुरक्षा‍के‍जलएः 2क. िूरी‍मुख्य‍ुड़कों‍और‍ुब‍ईप‍मुख्य‍ुड़कों‍पर‍जडजाआन‍द्वारा‍गजत‍कज‍50 दकमी‍प्रजत‍घंटे‍और‍कलेक्टर‍तथा‍ स्ट्थानीय‍ुड़कों‍पर‍30 दकमी‍प्रजत‍घंटे‍तक‍ुीजमत‍करें।‍जूां‍ुंभा‍ूज, ईच्च‍गजत‍ुीमा‍के‍मामले‍म‍ें प्रातनव ‍द्वारा‍ुूायता‍ प्राप्त‍करत‍े ुएए, स्ट्रीट‍जडजाआन‍का‍ईपयजग‍गजत‍कज‍ुीजमत‍करने‍के‍ुाधन‍के‍रूप‍में‍दकया‍जाना‍चाजूए। 2ख.‍पेड़ों, अआलडैं ‍और‍स्ट्रीट‍फनीचर‍के‍ईपयजग‍के‍ुाथ‍ड्राआााे‍और‍घुमाादार‍पथ‍के‍ुकं रीकरण‍के‍मा्यम‍ुे, 12‍ मीटर‍ऄथाा‍ईुुे‍कम‍के‍अरओडब्ल्य‍ूााली‍ुभी‍ुड़कों‍के‍र,दफक‍कज‍्ाजस्ट्थत‍करना। जडजाआन‍द्वारा‍गजत‍कज‍20‍दकमी‍प्रजत‍घंटा‍तक‍ुीजमत‍दकया‍जाना‍चाजूए। 2ग. दकनारों‍की‍ऄजधकतम‍उाँचाइ‍150 जममी‍ुे‍ऄजधक‍नूीं‍ूजगी, क्योंदक‍प,दल‍याजत्रयों‍के‍जलए‍उंची‍दकनारों‍पर‍चढ़ना‍ करठन‍ूजती‍ू,, जजुुे‍ईन्ू‍ें क,ररजाे‍पर‍चलना‍पड़ता‍ू।, ‍कम‍्स्ट्तता‍ााली‍ऄाजध‍के‍दौरान‍तेज‍गजत‍के‍ााूनों‍के‍जलए‍ ईच्चतर‍दकनारे/कबव‍खतरनाक‍ूज‍ुकते‍ू,ैं और‍ा‍ेााूनों‍के‍पलटने‍तथा‍दघु वटनाओं‍अदद‍के‍कारण‍बन‍ुकते‍ू।ैं  िूर‍की‍ुभी‍ुड़कों‍के‍जलए‍ऄंजतम‍ुड़क‍स्ट्तर‍तय‍दकया‍जाना‍चाजूए।‍ुड़कों‍की‍मरम्मत‍करते‍ुमय, जपछली‍ परतों‍कज‍आु‍तरू‍ुे‍ूटाना‍चाजूए, दक‍ऄंजतम‍ुड़क‍का‍स्ट्तर‍पूल‍े की‍तरू‍ुमान‍रू।े  फुटपाथ‍का‍स्ट्तर‍कभी‍भी‍आुुे‍ुटे‍क,ररजाे‍स्ट्तर‍ुे‍150‍जममी‍ुे‍ऄजधक‍नूीं‍ूजना‍चाजूए। 2घ. मजटर‍ााून‍पार्ककग‍द्वारा‍फुटपाथों‍कज‍ऄजतक्रमण‍ु‍े बचाने‍के‍जलए‍कुछ‍कुछ‍ऄतं रालों‍पर‍लगाए‍गए‍बफुव, बजलाड‍व और‍ऄन्य‍भौजतक‍ुामजग्रयों‍का‍ईपयजग‍दकया‍जाना‍चाजूए।‍ूालांदक, ऐुी‍ुामग्री‍कज‍लगातार‍रेललग‍ज,ुे‍ऄारजध‍का‍ जनमावण‍नूीं‍करना‍चाजूए, जजुुे‍प,दल‍चलने‍ाालों‍के‍जलए‍बाधा‍ईत्पन्न‍ूज।‍फुटपाथों‍कज‍ऄजतक्रमण‍ुे‍बचाने‍के‍जलए‍ ुदक्रय‍प्रातवन‍की‍अाश्यकता‍ू।,[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 323 2ङ. ब्लाआंड‍टन‍व और‍चौराूों‍पर‍ााूनों‍की‍गजत‍कज‍जनयंजत्रत‍करन‍े के‍जलए, कजनों‍के‍कबव‍की‍जत्रज्या‍12 मी.‍ुे‍ऄजधक‍ नूीं‍ूजनी‍चाजूए, जज‍दघु वटनाओं‍का‍कारण‍बनती‍ू।ैं ‍कलेक्टर‍ऄथाा‍स्ट्थानीय‍ुड़कों‍पर‍कजइ‍जस्ट्लप‍रजड‍ऄथाा‍फ्री‍लफ्े ट‍ टनव‍नूीं‍ददया‍जाना‍चाजूए।‍यदद‍जस्ट्लप‍रजड‍या‍टर्मनग‍पॉकेट‍कज‍प्रमुख‍ुड़कों‍पर‍ददया‍जाता‍ू,, तज‍र,दफक‍कज‍जनयंजत्रत‍ करने‍और‍जुग्नल‍के‍ुाथ‍ुुरजक्षत‍स्ट्तर‍पर‍प,दल‍यात्री‍क्रॉलुग‍प्रदान‍की‍जानी‍चाजूए। 2च. ुभी‍कलेक्टर‍और‍प्रमुख‍ुड़कों‍पर‍बुए-ईपयजजगता‍क्षत्रे ‍(एमयूजेड)‍की‍चौड़ाइ‍न्यनू तम‍1.8 मीटर‍ूजनी‍चाजूए, जजुुे‍दक‍बु‍स्ट्टॉप, ुड़क‍ईपयजजगताओं, पेड़ों, स्ट्रीट‍फनीचर, तूफानी‍जल‍प्रबंधन‍के‍जलए‍रजपण, अइपीटी/एनएमटी‍ स्ट्टैंड, ुिुल्क‍अइडल‍पार्ककग‍अदद‍कज‍ुमायजजजत‍दकया‍जा‍ुके‍और‍य‍े क,ररजा‍े या‍ुुरजक्षत‍प,दल‍चलने‍ाालों‍ूते ‍ु स्ट्थानों‍पर‍ऄजतक्रमण‍न‍करें। 2छ. ुभी‍कलेक्टर‍और‍प्रमुख‍ुड़कों‍पर‍ुाआदकल‍चालकों/एनएमटी‍ूते ु‍ुरु जक्षत‍पार्ककग‍ुजु ाधाएं‍और‍ुेााएं‍प्रदान‍की‍ जानी‍चाजूए। 2ज.‍प्रत्येक‍500-800‍मीटर‍की‍दरू ी‍पर‍ुुलभ‍ुाावजजनक‍िौचालय‍ईपलब्ध‍करााएं‍जाएं, जज‍प,दल‍चलन‍े ाालों‍और‍ ुाावजजनक‍परराून‍ईपयजगकतावओं‍द्वारा‍अुान‍पुएचं ‍के‍जलए‍बु‍स्ट्टॉप‍के‍जनकट‍जस्ट्थत‍ूज। 3. ुभी‍ुड़कों‍पर‍प,दल‍चलन‍ेाालों‍की‍ुुरक्षा, अराम‍और‍ुुजाधा‍के‍जलएः 3क. प,दल‍चलन‍े ाालों‍कज‍अरामदायक‍और‍ुुरजक्षत‍पुएचं ‍के‍ुाथ‍ग्राईंड‍स्ट्तर‍पर‍बन‍े रूना‍चाजूए, और‍ुबुे‍प्रमुख‍ ुड़क‍का‍कम‍ुे‍कम‍ईपयजग‍करना‍चाजूए, जब‍तक‍दक‍कजइ‍दुू रा‍जाकल्प‍न‍ूज। 3ख. ुभी‍ुड़कों‍के‍दजनों‍ओर‍एक‍जनरंतर‍ऄबाजधत‍फुटपाथ, जजुमें‍अरओडब्ल्यू‍12मी‍ुे‍ऄजधक‍चौड़ा‍ूज।‍पड़े ों‍/‍ ूररयाली‍/‍फेरी‍ाालज‍ूते ु‍स्ट्थानों‍और‍ुतू‍ईपयजजगताओं‍के‍जलए‍स्ट्थान‍के‍ऄलााा‍फुटपाथ‍की‍न्यूनतम‍चौड़ाइ‍1.8 मी‍ (2.4 मी‍स्ट्पष्ट‍उंचाइ‍के‍ुाथ)‍ूजनी‍चाजूए।‍फुटपाथ‍की‍चौड़ाइ‍प,दल‍चलने‍ाालों‍की‍ुंख्या‍के‍अधार‍पर‍जनधावररत‍की‍ जाएगी, और‍जूााँ‍भी‍अाश्यकता‍ूज, 1.8‍मीटर‍ुे‍ऄजधक‍चौड़ी‍ूजनी‍चाजूए। 3ग.‍फ्रंटेज‍जजन‍ऄथाा‍डेड‍जाड्थः‍खरीदारी‍के‍क्षेत्रों‍म‍ें फुटपाथों‍के‍जलए, फुटपाथ‍की‍चौड़ाइ‍में‍एक‍ऄजतररि ‍1‍मीटर‍ जजड़ा‍जाना‍चाजूए।‍अााुीय‍क्षेत्रों‍में‍0.5‍मीटर‍की‍डेड‍जाड्थ‍जजड़ी‍जा‍ुकती‍ू।, 3घ.‍18 मीटर‍अरओडब्ल्य‍ू ऄथाा‍ईुुे‍कम‍की‍ुड़कों‍पर, यदद‍प,दल‍चलने‍ााल‍े ्जि यों‍की‍अााजाूी‍दजनों‍ददिाओं‍ में‍8000 प्रजत‍घंटे‍ुे‍ऄजधक‍ू,, तज‍पूरे‍अरओडब्ल्य‍ू कज‍पद, ल‍चलन‍े के‍जलए‍रखा‍जाना‍चाजूए।‍अर्नथक‍गजतजाजध‍ और/ऄथाा‍ुुरक्षा‍और‍ुुजाधा‍में‍ुुधार‍की‍क्षमता‍के‍अधार‍पर, ऐुी‍ुड़कों‍कज‍प,दल‍चलने‍के‍जलए‍जनधावररत‍दकए‍जान‍े पर‍जाचार‍दकया‍जा‍ुकता‍ू,, भले‍ूी‍पद, ल‍चलने‍ााले‍्जि यों‍की‍अााजाूी‍8000‍प्रजत‍घंटे‍ुे‍कम‍ूज। 3ङ.‍ूर‍ुमय‍क,ररएजाे‍पर‍फुटपाथों‍की‍उंचाइ‍150‍जममी‍ुे‍कम‍ूजनी‍चाजूए‍और‍ाीा‍व जल‍के‍बूाा‍के‍जलए‍पयावप्त‍ क्रॉु‍ढलान‍ूजन‍े चाजूए।‍प,दल‍चलन‍े ाालों‍के‍जलए‍फुटपाथ‍पर‍अुानी‍ुे‍चढ़ने‍और‍ईतरने‍के‍जलए‍उंचाइ‍काफी‍कम‍ ूजनी‍चाजूए। 3च.‍ुभी‍ुुजाधाओं‍और‍जनुुजाधाओं‍कज‍कम‍गजतिीलता‍ााले‍ुभी‍लजगों‍द्वारा‍ुाावभौजमक‍पुएचं ‍ूते ‍ु ुुगम‍ा‍बाधा‍ रजूत‍ूजना‍चाजूए, जजुमें‍श्राणबाजधत‍और‍दजृ ष्टबाजधत‍्जि ‍भी‍िाजमल‍ू।ैं 3छ.‍प्रजत‍दकलजमीटर‍कम‍ुे‍कम‍5 ुुरजक्षत‍स्ट्रीट-लेाल‍क्रॉलुग‍की‍ुुजाधाएं‍ूजनी‍चाजूए‍और‍दज‍क्रॉलुग‍के‍बीच‍ ऄजधकतम‍स्ट्थान‍की‍दरू ी‍250 मीटर‍ु‍े ऄजधक‍नूीं‍ूजनी‍चाजूए।‍स्ट्थानों‍की‍पररजस्ट्थजत‍के‍ऄनुुार‍आन‍क्रॉलुग‍कज‍ााूनों‍324 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] की‍गजत‍कज‍कम‍करने‍ूते ु‍जुग्नल‍और/ऄथाा‍यातायात‍जनयंत्रकों‍(ुड़क‍स्ट्तर‍पर‍150‍जममी‍तक‍क्रॉुााक‍बढ़ाने‍के‍ मा्यम‍ुे)‍द्वारा‍प्रबंजधत‍दकए‍जा‍ुकते‍ू।ैं  प्रत्येक‍ुड़क‍पार‍करन‍े के‍स्ट्थान‍पर‍1 मीटर‍की‍न्यूनतम‍चौड़ाइ‍के‍ुाथ‍पड, ेस्ट्रेन‍रेफ्यजू । जज‍मजटर‍ााून‍ क,ररजाे‍के‍7 मीटर‍पार‍करन‍े के‍बाद‍ूज‍ुकते‍ू,ैं ऄथाा‍जबना‍जुग्नल‍ााल‍े जमडब्लॉक‍क्रॉलुग‍पर‍दजनों‍ओर‍ मजटर‍ााून‍क,ररएजाे‍के‍10 मी‍के‍ऄंतराल‍में‍ूज‍ुकते‍ू।ैं  जूा‍ं ुंभा‍ूज‍प,दल‍यात्री‍रेफ्यूज‍की‍चौडाइ‍कज‍1.75‍मीटर‍तक‍बढ़ाया‍जा‍ुकता‍ू,, तादक‍एक‍ुाआदकल‍कज‍ ुमायजजजत‍दकया‍जा‍ुके।  गंत्‍तक‍पुएचाँ ने‍के‍जलए‍ऄनााश्यक‍चक्करों‍कज‍रजकने‍के‍जलए‍स्ट्तरीय‍तौर‍पर‍ऄलग‍की‍गइ‍ुंरचनाओं‍(फुट- ओार‍जब्रज‍और‍प,दल-ईपमागव)‍ुे‍बचा‍जाना‍चाजूए।  यदद‍िूरी‍क्षेत्रों‍के‍पररधीय‍क्षेत्रों‍में‍राजमागों‍की‍ईपजस्ट्थजत‍के‍कारण‍स्ट्तरीय‍तौर‍पर‍ऄलग‍दकए‍गए‍प,दल‍ यात्री‍क्रॉलुग‍ऄपररूायव‍ू,ैं तज‍ऐुी‍क्रॉलुग‍ुंरचनाएं‍कइ‍स्ट्थानों‍में‍थजड़े‍ऄंतरालों‍म‍ें ूजनी‍चाजूए।‍दकनारों‍पर‍ जाकाु‍ााले‍क्षेत्रों‍में‍प्रजत‍दकलजमीटर‍कम‍ुे‍कम‍4‍क्रॉलुग‍ुुजाधाएं‍ूजनी‍चाजूए।‍प्रत्येक‍क्रॉलुग‍कज‍ ुाावभौजमक‍रूप‍ुे‍ुभी‍के‍जलए‍ुुलभ‍ूजना‍चाजूए। 3ज.‍जूां‍भी‍मानदंडों‍के‍ऄनुु ार‍ऄनुमजत‍दी‍गइ‍ूज, प्राकृजतक‍जनगरानी‍ऄथाा‍'ुड़क‍पर‍नज़र' कज‍ुभी‍ुड़कों‍पर‍ बाधाओं‍और‍बांईड्री‍ाॉल‍कज‍ूटाकर, ुड़क‍के‍दकनारे‍के‍जनमावण‍के‍जलए‍ुक्षम‍दकया‍जाना‍चाजूए।‍यू‍ऄंदर‍ु‍े लजगों‍ कज‍फुटपाथ‍पर‍नजर‍रखने‍ुक्षम‍बनाएगा‍और‍आु‍प्रकार‍फुटपाथों, बु-स्ट्टॉप‍और‍ुाावजजनक‍स्ट्थानों‍पर‍मजूलाओं‍के‍ ईत्पीड़न‍कज‍ूतजत्ुाजूत‍करन‍ेमें‍मदद‍करेगा।  मुख्य‍आमारत‍के‍ऄग्रभाग‍कज‍ुड़क‍की‍ओर‍ुम्मुख‍ूजना‍चाजूए, चाू‍े ाू‍ुेटब,क‍के‍जबना‍ुंपजि‍की‍लाआन‍पर‍ जस्ट्थत‍ू‍, ऄथाा‍ुेटब,क‍और‍पारदिी‍दकनारे‍के‍भीतर‍ुदक्रय‍ईपयजग‍के‍ुाथ‍ूज, जज‍ुड़क‍ुुरक्षा‍में‍मददगार‍ ूजता‍ू।, ‍ुड़कों‍की‍दश्ृ य‍जनगरानी‍की‍ुुजाधा‍के‍जलए‍्ााुाजयक‍फ्रंटेज‍पर‍न्यूनतम‍50%‍पारदर्निता‍(जबना‍ रंग‍के)‍के‍ुाथ‍ऄग्रभाग‍ूजन‍े चाजूए।  यदद‍ुाआटों‍के‍बाड़े‍की‍अाश्यकता‍ूजती‍ू,, तज‍जमीन‍के‍स्ट्तर‍ुे‍300‍जममी‍की‍उंचाइ‍ुे‍पारदिी‍बाड़े‍का‍ ईपयजग‍दकया‍जाना‍चाजूए।  ुड़क‍कज‍ुदक्रय‍करने‍और‍आु‍े ुुरजक्षत‍बनान‍े के‍जलए, चलन‍े के‍मागव‍के‍ुाथ‍और‍जािेी‍रूप‍ुे‍ऄत्यजधक‍ुंख्या‍ में‍प,दल‍चलने‍ााल‍े क्षेत्रों‍के‍ुाथ‍फेरीााले‍स्ट्थानों‍कज‍जचजन्ूत‍दकए‍जाने‍चाजूए।‍पीने‍के‍पानी‍के‍प्याई-घर‍और‍ िौचालय‍ुजूत‍ईपयजजगताओं‍के‍जलए‍जगू‍की‍यजजना‍बनाइ‍जानी‍चाजूए‍तादक‍चलने‍की‍जगू‍बढ़े‍और‍ आुमें‍कजइ‍ुमझौता‍नूीं‍दकया‍गया‍ूज। 3झ. क,ररएजाे‍के‍जलए‍प्रदान‍की‍गइ‍कजइ‍ूाइ-मास्ट्ट‍लाआरटग‍के‍ऄलााा‍प,दल‍चलने‍ाालों‍और‍ुाआदकल‍चलान‍े ाालों‍के‍ जलए‍पयावप्त‍लज-मास्ट्ट‍स्ट्रीट‍लाआरटग‍भी‍प्रदान‍दकए‍जाने‍चाजूए।‍लगभग‍20 एलयूएक्ु‍का‍स्ट्तर‍ग,र-खरीदारी‍क्षेत्रों‍और‍ फुटपाथों‍के‍जलए‍ईपयु￿‍ू‍, और‍िॉलपग‍क्षेत्रों, बु-स्ट्टॉप, मेरज‍स्ट्टेिन‍ुे‍बाूर‍जनकलन‍े और‍प,दल‍चलन‍े ाालों‍के‍आकट्ठा‍ ूजने‍या‍प्रतीक्षा‍ााले‍दकुी‍भी‍क्षेत्र‍में‍25-30‍एलयूएक्ु-लेाल‍की‍अाश्यकता‍ूजती‍ू।, 3ञ. ईच्च‍ईपयजजगता‍के‍जलए‍ुड़क‍के‍कजनों‍पर‍कूड़ेदान, पजस्ट्ट-बॉक्ु, ुाआनेज‍और‍ऄन्य‍ुाावजजनक‍ुुजाधाएं‍प्रदान‍करें।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 325 4.‍ुभी‍ुड़क‍ईपयजगकतावओं‍ूते ु‍क्लाइमेट‍कम्फटव‍के‍जलएः 4क.‍पड़े ‍ुभी‍ुड़कों‍के‍जलए‍एक‍अाश्यक‍घटक‍ू‍ैं -‍प,दल‍चलन‍े ाालों/ुाआदकल‍चालकों‍कज‍छाया‍प्रदान‍करन‍े और‍धपू ‍ की‍जचलजचलाूट‍ुे‍बचन‍े के‍जलए।  12‍मीटर‍ुे‍कम‍अरओडब्ल्यू‍ााली‍ुड़कों‍के‍जलए‍प्रजत‍दकमी‍कम‍ुे‍कम‍125‍पेड़‍और‍12‍मीटर‍ुे‍ऄजधक‍ अरओडब्ल्य‍ू ााली‍ुड़कों‍पर‍प्रजत‍फुटपाथ‍प्रजत‍दकमी‍कम‍ु‍ेकम‍125‍पड़े ‍ूजन‍े चाजूए़। पेड़ों‍के‍बीच‍ऄंतराल‍12‍मीटर‍ुे‍ऄजधक‍नूीं‍ूजन‍े चाजूए‍केाल‍चौराूों‍ााल‍ेस्ट्थान‍कज‍छजड़कर। 4ख.‍नगरीय‍ईष्मा‍प्रभाा‍(ऄबवन‍ूीट‍अआलडैं ‍आफेक्ट)‍कज‍कम‍करने‍के‍जलए‍ुतू‍के‍जनमाणव ‍ूते ‍ु ूाइ‍एल्बेडज‍(पराातवन‍ कज‍कम‍करन‍ेााले)‍ुामजग्रयों‍का‍ईपयजग‍दकया‍जाना‍चाजूए। 4ग.‍ओारूग्ैं ु‍और‍अकेड्‍ु‍के‍ुाथ‍दकनारों‍पर‍फुटपाथ‍ााले‍भानज‍का‍जनमावण‍दकया‍जाना‍चाजूए‍जज‍प,दल‍चलन‍े ाालों‍कज‍ऄच्छी‍ुरु क्षा‍प्रदान‍करते‍ू।ैं 5. ुभी‍ुड़क‍ईपयजगकताओंव ‍ूते ु‍ुाावभौजमक‍पुएचं ‍और‍ुुजाधाएं‍ुुजनजित‍करनाः 5क.‍ुभी‍ुुजाधाओं‍और‍जनुुजाधाओं‍कज‍कम‍गजतिीलता‍ााले‍ुभी‍लजगों‍द्वारा‍ुाावभौजमक‍पुएचं ‍ूते ‍ु ुुगम‍ा‍बाधा‍ रजूत‍ूजना‍चाजूए, जजुमें‍ुंजूता‍के‍ऄनुुार‍श्राणबाजधत‍और‍दजृ ष्टबाजधत‍्जि ‍भी‍िाजमल‍ू।ैं 5ख.‍जाकलांग‍्जि यों/बुजगु ों‍के‍जलए‍अाागमन‍म‍ें अुानी‍ूते ु‍लगातार‍बन‍े ऄारजध‍मुख्य￿‍फुटपाथ‍प्रदान‍दकए‍जान‍े चाजूए।‍जाजभन्न‍स्ट्थानों‍पर‍ईपरी‍जूस्ट्ुे/रैंप‍अदद‍के‍ईजचत‍प्रााधान‍के‍जलए‍फुटपाथ‍की‍उाँचाइ‍कज‍अरओडब्ल्य‍ू के‍ुाथ‍ 150 जममी‍के‍जनरंतर‍स्ट्तर‍पर‍बनाए‍रखा‍जाना‍चाजूए,‍ज,ुे‍दक‍ुंपजि‍में‍प्राेि, क्रॉलुग‍आत्यादद। 5ग.‍लगभग‍70‍ु‍े 250‍मीटर‍के‍ऄतं राल‍पर‍एट-ग्रेड‍क्रॉुाॉक‍(राजमागों‍या‍बीअरटी‍कॉरीडजुव‍पर‍फुट-ओार‍जब्रज)‍ प्रदान‍दकए‍जाने‍चाजूए, जज‍रांजजट‍स्ट्टॉप‍के‍स्ट्थान, ुड़क/भूजम‍ईपयजग‍गजतजाजधयों‍के‍प्रकार‍और‍अुपाु‍के‍भान‍के‍ प्राेि‍और‍गंत्ों‍के‍ुाथ‍ुंरेजखत‍ूों। 5घ.‍ुलु भ‍ुाावजजनक‍िौचालय‍ूर‍500-800‍मीटर‍की‍दरू ी‍पर‍ईपलब्ध‍कराए‍जाने‍चाजूए, ऄजधमानतः‍जज‍प,दल‍ याजत्रयों‍और‍ुाावजजनक‍परराून‍ईपयजगकताओंव ‍द्वारा‍अुानी‍ुे‍पुएचं न‍े के‍जलए‍बु‍स्ट्टॉप‍के‍नजदीक‍जस्ट्थत‍ूज। 6.‍नगरीय‍उष्मा‍प्रभाा‍(ऄबवन‍ूीट‍अआलडैं ‍आफेक्ट)‍कज‍कम‍करना‍और‍प्राकृजतक‍तूफानी‍जल‍प्रबंधन‍का‍ुूयजगः 6क.‍पारगम्य‍फिव‍के‍ईपयजग, पेड़‍लगाने‍ााले‍जजन‍अदद‍के‍मा्यम‍ुे‍ऄभद्ये ‍ुतूों‍कज‍कम‍करना, भूजल‍ुंभरण‍कज‍ बढ़ाना‍और‍मौुमी‍बाढ़‍कज‍रजकना। 6ख.‍ुड़क‍जडजाआन‍में‍बायज-दफल्टरेिन‍बेड्‍ु, स्ट्ाेल्ु‍और‍चारज‍ओर‍ु‍े जघरे‍तालाबों‍के‍मा्यम‍ुे‍प्राकृजतक‍तूफानी‍जल‍ दफल्टरेिन‍और‍ऄािजीण‍कज‍एकीकृत‍करना। 6ग.‍ूररयाली‍कज‍बढ़ान,े ाृक्षारजपण, प्रभााी‍पराातवन‍फिों‍अदद‍के‍ईपयजग‍द्वारा‍ईष्मा‍द्वीप‍प्रभाा‍(ूीट‍अआलडैं ‍ आफेक्ट)‍कज‍कम‍करना। 7. आंटरमीजडएट‍ुाावजजनक‍परराूनः म्याती‍ुाावजजनक‍परराून‍(अइपीटी)‍ऐु‍े भाड़े‍पर‍जलए/ुाझाकृत‍दकए‍गए‍परराून‍के‍ुाधन‍ूजत‍े ू‍ैं जज‍ुाावजजनक‍ परराून‍प्रणाली‍कज‍ुमथवन‍ऄथाा‍जनजी‍परराून‍ईपयजग‍के‍जलए‍एक‍ऄन्य‍जाकल्प‍के‍रूप‍म‍ें फीडरों‍के‍तौर‍पर‍काय‍व कर‍ुकता‍ू।, ‍अइपीटी‍म‍ें ुाआदकल-ररक्िा, ऑटज-ररक्िा, इ-ररक्िा, ट,जक्ुयां‍और‍ऄन्य‍ााून‍प्रकार‍िाजमल‍ू,ैं जज‍ परराून‍के‍एक‍ुाझा‍ुाधन/फीडर‍ुेाा‍के‍रूप‍म‍ें ुेाारत‍ू‍, और‍जज‍मजटर‍ााून‍ऄजधजनयम‍के‍तूत‍भी‍जनर्ददष्ट‍ू।ैं ‍ ट,क्ुी‍एक‍एकीकृत‍परराून‍ुेाा‍प्रदान‍करने‍म‍ें एक‍मूत्ापणू व‍भूजमका‍जनभाती‍ू,, जज‍दक‍ऄन्य‍ुभी‍मेरज‍िूरों‍की‍तरू‍326 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ुड़क‍पर‍भी‍ईपलब्ध‍ूजनी‍चाजूए, ऐुे‍लजगों‍के‍जलए‍जज‍ुाावजजनक‍परराून‍के‍जलए‍कार‍का‍ईपयजग‍नूीं‍करते‍ू‍ैंऔर‍ कुछ‍यात्राओं‍के‍जलए‍ट,क्ुी‍कज‍ऄपनात‍े ू।ैं ‍ऑटज-ररक्िा‍भी‍ुाावजजनक‍परराून‍के‍जलए‍एक‍ुाझा‍ऄथाा‍दकराए‍पर‍ ुाधन‍के‍रूप‍म‍ें एक‍अाश्यक‍भूजमका‍जनभाते‍ू,ैं जज‍जाजभन्न‍प्रकार‍की‍यात्राओं‍के‍जलए‍घर-घर‍तक‍ुंपकव‍प्रदान‍करत‍े ू,ैं और‍जनजी‍ुाधन‍के‍ुापेक्ष‍एक‍दकफायती‍जाकल्प‍प्रदान‍करत‍े ू।ैं 8. माु‍रेजपड‍रांजजट‍जुस्ट्टम‍(एमअरटीएु)‍की‍पररभाीाः माु‍रेजपड‍रांजजट‍जुस्ट्टम‍(एमअरटीएु)‍कज‍ऐुी‍दकुी‍भी‍ुाावजजनक‍पारगमन‍प्रणाली‍के‍रूप‍में‍पररभाजीत‍दकया‍जा‍ ुकता‍ू‍,जजुमें‍10,000‍ुे‍ऄजधक‍पीक‍ऑार‍डायरेक्िन‍रटप्ु‍(पीएचपीडीटी)‍ल‍ेजाने‍की‍क्षमता‍ूजती‍ू।, ऄनलु ग्नक 8: ुास्ट्ं कृजतक‍पररुीमा‍की‍ुाकं ेजतक‍ुचू ी  जनजामुद्दीन‍दरगाू-‍ुएमायूाँ‍का‍मकबरा‍पररुर-ुुन्दर‍नुवरी  िमिी‍दकला-जूज़‍मूल-ज़फर‍मूल-बााली-अदम‍खान‍मकबरा-‍कुतुबमीनार‍पररुर  जाजय‍मंडल‍-‍बेगमपरु ‍-‍ुराय‍िाूजी‍-लाल‍गुम्बद  ुफदरजंग‍मकबरा‍-‍लजधी‍ईद्यान-‍लजधी‍ुंस्ट्थागत‍क्षेत्र-‍लजधी‍कला‍मंच  जत्रकजना‍पाकव-‍िाूपुरजाट‍फ,िन‍स्ट्रीट‍-‍तजूफेााला‍गुंबद-‍एजियाड‍जालेज‍ुजुाआटी  दफरजजिाू‍का‍मकबरा‍-‍ूौजखाु‍गांा‍-‍ूौजखाु‍झील  जखड़की‍मजस्ट्जद-ुतपुलानल्ु लाू-‍जचराग‍ददल्ली‍म‍ेंस्ट्मारक-‍जूााँपनाू‍जंगल  ूरे रटेज‍जुटी‍(ूरे रटेज‍ज़जन)‍के‍भीतर‍ूरे रटेज‍प्रीकाआंट्ु:‍ऐजतूाजुक‍बाज़ार‍(ज,ुे‍खारी‍बााली, पराठेााली‍गाली‍/‍ कटरा‍/‍चांदनी‍चौक‍जास्ट्टा‍/‍जामा‍मजस्ट्जद‍के‍अुपाु‍मजजतया‍मूल‍/‍क्षेत्र‍के‍अुपाु‍का‍क्षेत्र)  एलबीजेड‍के‍भीतर‍जाराुत:‍ुेंरल‍जास्ट्टा ऄनलु ग्नक 9: पनु र्नाकाु‍के‍जलए‍गर, -ऄनरूु प‍क्षत्रे ों‍म‍ेंऔद्यजजगक‍कजन्ुने रेिन गर, -ऄनरूु पण‍ईद्यजग क्षत्रे ‍(एचए) अनंद‍परबत 49.5 िाूदरा 19.7 ुमयपुर‍बादली 20.1 जााूर‍नगर 17.9 ुुल्तानपुर‍माजरा 15.5 ूस्ट्तुाल‍पॉकेट‍-‍ए 5.5 नरेि‍पाकव‍एक्ुटेंिन 12.7 जलबाुपुर 32.4 पीरागढ़ी‍गााँा 17.2 ख्याला 47[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 327 ूस्ट्तुाल‍पॉकेट‍-‍डी 6 िलमर‍गााँा 5.1 नइ‍मडं जली 24.7 नाादा 5.3 ररठाला 41.2 स्ट्ाणव‍पाकव‍मडुं का 6.9 ूद, रपुर 22.2 करााल‍नगर 25.5 डाबरी 2.6 बुइ‍दारापुर - प्रूलादपुर‍बांगर 23.4 मुंडका‍और‍मडुं का‍ईद्यजग‍नगर 80.8 रणूजला‍(*ईद्यजग‍जाभाग,‍जीएनुीटीडी‍द्वारा‍ददनाकं ‍ 26‍ऄगस्ट्त‍2019‍कज‍ऄजधुजूचत‍दकया‍गया ऄनलु ग्नक‍10:‍एमपीडी-41‍के‍जलए‍प्रमखु ‍प्रदिनव ‍ुकं ेतक‍(की-पफोमुें ‍आंडीकेटर) रटप्पजणया ाँ क्र.ु.ं केपीअइ‍का‍नाम माप‍के‍ुाधन‍ ददल्ली‍म‍ेंऄजधकांि‍ प्रदीू ण‍बाूरी‍स्रजतों‍ु‍े ू,, जजु‍पर‍आु‍िूर‍ का‍कजइ‍जनयंत्रण‍नूीं‍ ू।, ‍स्ट्थानीय/स्ट्ादेिी‍ जजुमें, कारक‍ाू‍प्रदीू ण‍ू‍, स्ट्थानीय‍ाायु‍ 1 जज‍िूर‍म‍ेंईत्पन्न‍ प्रदीू ण‍में‍कमी  स्ट्थानीय‍पीएम2.5 = स्ट्थानीय‍कारक‍X पीएम2.5 मूल्य ूजता‍ू,, जजुके‍स्रजत‍  ऄालजकन‍= जनगरानी‍केन्द्रों‍की‍ुंख्या‍x 365 (द,जनक‍मापन‍के‍जलए) का‍पता‍स्रजत‍ऄ्ययनों‍  ऄच्छी‍श्रणे ी‍= ुीपीुीबी‍द्वारा‍प्रदान‍दकए‍जनदेिों‍ु‍ेमेल‍खाती‍ू।, के‍मा्यम‍ुे‍लगाया‍ जा‍ुकता‍ू।, ‍ऐुे‍ ऄ्ययन‍प्रत्येक‍5 ाीव‍ में‍दकए‍जाने‍चाजूए। नदी, जल‍जनकायों‍और‍ नालों‍के‍जलए‍ जजुमें, ्जि गत‍स्ट्कजर‍की‍ जल‍प्रदीू ण‍  प्राकृजतक‍जनकायों‍में‍नददया,ं जल‍जनकाय‍और‍प्राकृजतक‍नाले‍िाजमल‍ू।ैं ‍ गणना‍2.4‍में‍जनर्ददष्ट‍ 2 जनयंत्रण  न्यूनतम‍ाांजछत‍जाघरटत‍ऑक्ुीजन‍(जनगरानी‍के‍पूल‍े चरण‍ूते )ु ‍= 4 मापदंड‍के‍ऄनुुार‍1- mg/L (ुीपीुीबी‍जनदेिों‍के‍ऄनुुार‍बाद‍म‍ेंुंिजजधत‍दकए‍जा‍ुकते‍ू)ैं 5‍की‍श्रेणी‍में‍की‍जानी‍ चाजूए।‍तीन‍ऄंकों‍का‍328 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] एक‍औुत‍ुमग्र‍ केपीअइ‍स्ट्कजर‍प्रदान‍ करेगा। ूररत‍ अच्छादन‍ /‍ कार‍कज‍भारतीय‍ान‍ ूररत‍कार‍ अधार‍रेखा‍के‍ुंदभव‍में‍िूर‍के‍ूररत‍क्षेत्र‍(%) में‍ाार्नीक‍ाृजद्ध‍(ईदाूरण‍ 3 ुाेक्षण‍ददिाजनदेिों‍के‍ ुंाधवन 2021‍के‍अंकड़े) ऄनुुार‍ पररभाजीत‍ एां‍गणना‍की‍गइ‍ू।, पुनरूद्धाररत‍जल‍ जनकाय‍कज‍पररभाजीत‍ करने‍ूते ‍ु मापदडं ।  जल‍जनकायों‍म‍ें ऄथाा‍आुके‍ अुपाु‍ठजु‍ ऄपजिष्ट‍की‍ ईपजस्ट्थजत‍का‍नूीं‍ ूजना।  जल‍जनकायों‍म‍ें ग,र-िजजधत‍ ऄपजिष्ट‍जल‍कज‍ प्रााजूत‍नूीं‍ दकया‍जाना।  जल‍जनकाय‍के‍ चारों‍ओर‍घरे े‍के‍ रूप‍म‍ेंुुरक्षा‍का‍ जल‍जनकायों‍का‍ ूजना। 4 x 100 कायाकल्प  जल‍जनकाय‍म‍ें कजइ‍भी‍दश्ृ य‍ जलीय-ुुपजीण‍ (यूरजदफकेिन)‍का‍ नूीं‍ूजना।  4 mg/l‍का‍ न्यूनतम‍डीओ  जनुाधारण‍के‍ जलए‍ुुलभ‍ (ाांछनीय‍लेदकन‍ ऄजनाायव‍नूीं)‍  जनयजमत‍ रखरखाा‍प्रणाली‍ का‍ूजना।  जपछल‍ेाीव‍की‍ ऄपेक्षा‍पानी‍की‍ मात्रा‍में‍कमी‍नूीं‍ ूजना। बाढ़‍प्राण‍क्षेत्रों‍कज‍ बाढ़‍जजजखम‍में‍ अधार-रेखा‍के‍ुंदभव‍में‍बाढ़‍प्राण‍क्षेत्रों‍की‍ुंख्या‍म‍ेंकमी‍ूजना‍(ईदाूरण‍ लजकजनमावण‍जाभाग‍ 5 कमी 2021‍अंकड़े) तथा‍ददल्ली‍यातायात‍ पुजलु‍द्वारा‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 329 पररभाजीत‍एां‍ जचजन्ूत‍दकया‍जाना। ऄपजिष्ट‍जल‍का‍ 6 पुन:‍ईपयजग x 100 'ुुरजक्षत' श्रेणी, ज,ुा‍ 7 भूजल‍ुंाधवन ऄालजकन‍कूओं‍की‍ुख्ं या‍जजुमें‍भूजल‍गूराइ‍'ुुरजक्षत' श्रेणी/स्ट्तर‍म‍ेंू।, दक‍ुीजीडब्ल्यूबी‍द्वारा‍ पररभाजीत‍ू।, लैंडदफल‍स्ट्र,ु‍कज‍ 8 कम‍करना x 100 ऄपजिष्ट‍ुे‍ाेल्थ‍ अधार-रेखा‍के‍ुंदभव‍में‍पुनचवकृत‍ुीएंडडी‍ईत्पादों‍ुे‍राजस्ट्ा‍के‍ुृजन‍में‍ाृजद्ध।‍ 9 में‍पररातवन (ईदाूरण‍2021‍अंकड़े) नाीकरणीय‍ईजाव‍ कुल‍ईपयजग‍म‍ें स्रजतों‍में‍ुौर, पान, 10 नाीकरणीय‍उजा‍व जल‍और‍जजयजथमवल‍ का‍जूस्ट्ुा िाजमल‍ू।ैं डीडीएमए‍जनदिे ों‍के‍ ऄनुुार‍भूकंपीय‍ भूकंपीय‍ 11 ऄनुपालन‍की‍ ऄनुपालन अाश्यकता‍ााल‍े भान। अग‍के‍प्रकजप‍ु‍े अधार-रेखा‍के‍ुंदभव‍में‍अग‍की‍घटनाओं‍की‍ुंख्या‍म‍ेंकमी। 12 ुुरक्षा (ईदाूरण‍2021‍अंकड़े) न्यू‍ूाईलुग‍स्ट्टॉक‍ देख ें‍एुएुअइ1:‍खडं ‍ 13 में‍लघु‍प्रारूप‍ x 100 3.2.2. अााु‍का‍जूस्ट्ुा डीयूएुअइबी‍के‍ 14 स्ट्लम‍पुनाावु ऄनुुार‍ुूचीबद्ध‍ झुजग्गया ं प्रत्येक‍ पांच‍ ाीव‍ म‍ें िूर‍ के‍ एक‍ जास्ट्तृत‍ पजब्लक‍रांुपजटव‍ जनजी‍ुाधन‍द्वारा‍कुल‍यात्राओं‍ूते ु‍ुाावजजनक‍और‍परराून‍के‍ुाझा‍ुाधन‍ परराून‍ मॉडल‍ 15 की‍ओर‍जिफ्ट द्वारा‍कुल‍यात्राओं‍का‍ऄनुपात‍(प,दल‍भ्रमण‍कज‍छजड़कर)। जाभाजन‍ ुाेक्षण‍ के‍ मा्यम‍ुे‍अंकड़ों‍की‍ पुजष्ट‍दकया‍जाना। आलेजक्रक‍ााून‍ 16 कज‍ऄपनाना x 100 यूएनडीपी‍ द्वारा‍ माना‍जाकाु‍ 17 स्ट्ातः‍स्ट्पष्ट प्रचाररत‍ कायवप्रणाली‍ ुूची का‍ ईपयजग‍ ददल्ली‍ के‍330 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] जलए‍ एचडीअइ‍ का‍ पता‍लगान‍े ूते ‍ु दकया‍ जा‍ुकता‍ू।, भारतीय‍पुरातत्ा‍ ुाेक्षण‍द्वारा‍ 18 धरजूर‍ुरं क्षण x 100 यथाजनधावररत‍ुरं क्षण‍ मापदंड। ुाावजजनक‍ुड़कों‍ देख ेंऄनुलग्नक 6 : स्ट्रीट‍ 19 की‍जीांतता x 100 जडजाआन‍जाजनयमन कायवबल‍में‍ 20 x 100 मजूला‍भागीदारी ऄनलु ग्नक 11: आंडस्ट्रीज‍की‍ुचू ी (एम1) ‐ आु‍श्रेणी‍में‍ईच्च‍प्रौद्यजजगकी, ऄनुुंधान‍और‍जाकाु, ईच्च‍मूल्य‍ार्नधत‍एां‍ज्ञान‍गून‍गजतजाजधयों‍में‍ुजम्मजलत‍ ्ाुाय‍िाजमल‍ूोंगे। ‐ आु‍औद्यजजगक‍ईपयजग‍जजन‍में‍जाजभन्न‍प्रकार‍की‍गजतजाजधयों‍ऄथाा‍ईपयजग‍के‍श्रेजणयों‍की‍ऄनुमजत‍ू‍, जज‍ प्रौद्यजजगकी‍और‍ऄनुुंधान-ईन्मुख‍ईद्यजग‍तथा‍प्रकृजत‍में‍ग,र-जाजनमावण‍ुे‍ुंबंजधत‍ू;ैं‍ 1.‍ुॉफ्टाये र‍ईद्यजग‍ क.‍कंप्यूटर‍ूाडवाेयर‍और‍ुॉफ्टाेयर‍ईद्यजग‍और‍कंप्यूटर‍ूाडाव ेयर‍और‍ुॉफ्टाेयर‍का‍ईपयजग‍करके‍जुस्ट्टम‍एकीकरण‍ करने‍ााल‍ेईद्यजग। ख.‍कंप्यूटर‍और‍टेलीकॉम‍ुुजाधाओं‍के‍आंटरफेु‍कज‍एकीकृत‍और‍म,न्यूप्लेट‍करन‍े ााल‍ेईद्यजग। ग.‍ुॉफ्टाेयर‍ईत्पाद‍और‍मजबाआल‍ऄनुप्रयजग‍अइटी, और‍अइटी‍ुक्षम‍कायव 2. अइटी‍ुाे ा‍ईद्यजग क.‍आंटरनेट‍और‍इमले ‍ुेाा‍प्रदाता ख.‍ाल्डव‍ााआड‍ाेब‍ुर्नाुेज‍प्रजााआडर‍इकॉमुव‍एडं ‍कंटेंट‍डेालपमेंट। ग.‍आलेक्रॉजनक‍डाटा‍आंटरचेंज‍(इडीअइ) ुेााएाँ घ.‍ाीजडयज‍कॉन्फ्रेंलुग, ाी‍ु,ट, अइएुडीएन‍ुेााएं ङ.‍आलेक्रॉजनक‍/‍अइटी‍डाटा‍ुेंटर‍गजतजाजधया ाँ 3. अइटीइएु‍ईद्यजग‍ क. ग्राूक‍ुंपकव‍ुेााएं, ज,ुे, कॉल‍/‍ुंपकव‍केंद्र‍और‍इमेल‍ुूायता‍डेस्ट्क ख. ब,क‍ऑदफु‍प्रजुेलुग ग. जाि‍और‍लेखा‍(दरू स्ट्थ‍तौर‍पर‍प्रदि) घ. बीमा‍दााा‍प्रजुेलुग‍(दरू स्ट्थ‍तौर‍पर‍प्रदि) ङ. माना‍ुंुाधन‍ुेााएं‍और‍ऄन्य‍परामि‍व(दरू स्ट्थ‍तौर‍पर‍प्रदि) च. ाेब‍ुाआट‍जाकाु‍और‍रखरखाा‍ुेााए‍ाँ छ. दरू स्ट्थ‍जिक्षा ज. जबजनेु‍प्रजुेु‍अईटुजर्मुग, नॉलेज‍प्रजुेु‍अईटुजर्मुग झ. ुॉफ्टाेयर‍एक्ुटेंिन‍जाकाु[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 331 ञ. आलेक्रॉजनक‍जडजाआन‍और‍ईत्पाद‍जाकाु ट. आंजीजनयररग‍जडजाआन‍और‍ईत्पाद‍जाकाु ठ. डेटाबेु‍प्रदान‍करके‍ऄथाा‍दजुनया‍भर‍म‍ें फ,ले‍डेटाबेु‍तक‍पुएचाँ ‍द्वारा‍ईपयजग‍की‍जानकारी‍की‍अाश्यकता‍कज‍ पूरा‍करने‍ााल‍ेईद्यजग।‍ ड. ुूचना‍प्रौद्यजजगकी‍के‍जाजभन्न‍ऄथाा‍ुभी‍घटकों‍के‍पररष्कृत‍परीक्षण‍ूते ु‍ुुजाधाएं‍प्रदान‍करने‍ााल‍ेईद्यजग।‍ ढ. दरू ुंचार‍और‍ुेााओं‍कज‍ुक्षम‍करना। 4.‍मीजडया क. टीाी‍और‍ाीजडयज‍कायवक्रम‍ईत्पादन। ख. फजटज‍कम्पजलजग‍और‍डेस्ट्कटॉप‍पजब्लकेिन। ग. पजब्ललिग घ. ऑजडयज-जाजऄु ल‍ुेााएं 5.‍जा, ‍प्रौद्यजजगकी‍/‍जचदकत्ुा क. ईत्पादों‍ऄथाा‍प्रदक्रयाओं‍का‍ऄनुुंधान‍और‍जाकाु‍तथा‍जाजनमावण, जज‍जाजिष्ट‍जीजात‍प्रणाजलयों‍(पौधों, जानारों‍ और‍रजगाणुओं‍ऄथाा‍ईुके‍कुछ‍जूस्ट्ुों)‍का‍ईपयजग‍करके‍ऄथाा‍ईनुे‍प्राप्त‍दकए‍गए‍एंजाआम/ज,ा‍राुायजनक‍ ऄजभकारकों‍का‍ईपयजग‍करते‍ू।ैं ख.‍जेनेरटक‍आंजीजनयररग‍और‍कॉन्रेक्ट‍ऄनुुंधान‍तथा‍न,दाजनक‍परीक्षण ग.‍मेजडकल‍रांुदक्रप्िन‍ुेााएं 6.‍ऄनुु धं ान‍एा‍ंजाकाु‍और‍जडजाआन क.‍आलेक्रॉजनक्ु‍अरएंडडी-जडजाआन‍और‍ईत्पाद‍जाकाु ख.‍आंजीजनयररग‍अरएडं डी-‍जडजाआन‍और‍ईत्पाद‍जाकाु ग.‍ज,ा‍प्रौद्यजजगकी‍ऄनुुंधान‍एां‍जाकाु घ.‍जडजाआन‍गारमेंट्ु‍ईद्यजग, रत्न‍और‍अभूीण, ाेब‍जडजाआन‍अदद ङ.‍कपड़ा‍जडजाआलनग‍और‍फ,जब्रक‍परीक्षण‍अदद। च.‍ऄंतर-ऄनुिाुनात्मक‍ऄनुुधं ान‍और‍जाकाु‍ुेााएं 6.‍ऄन्य क. प,केलजग ख. आलेक्रॉजनक‍ुमान,‍जाद्युत‍(आलेजक्रकल)‍जातरण‍ुेााएं ग. टीाी‍और‍ऄन्य‍आलेक्रॉजनक‍ास्ट्तुओं‍की‍ुेाा‍और‍मरम्मत। घ. रांुपजटव‍ुेााएं ङ. खाद्य‍और‍पेय‍ुेााएं च. ुंस्ट्कृजत‍और‍रचनात्मक‍ईद्यजग छ. स्ट्टाटव‍ऄप, आनक्यूबेटर‍और‍एक्ुीलरेटर नजटः 1. *ुड़क‍का‍न्यूनतम‍अरओडब्ल्यू‍ऄथाा‍ुड़क‍का‍फ,लाा‍जजु‍पर‍क्रम‍ुंख्या‍‍‍7‍में‍ईजल्लजखत‍गजतजाजधयााँ‍ऄनुमत‍ू,ैं आु‍प्रकार‍ूः, i. 1000‍ागवमीटर‍तक‍भूखंड-‍12‍मीटर‍मागावजधकार ii. 1000‍ागवमीटर‍ुे‍उपर‍भखू ंड-‍18‍मीटर‍मागावजधकार332 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 2. जीएनुीटीडी‍के‍ईद्यजग‍जाभाग‍के‍परामि‍वुे‍डीएुअइअइडीुी‍द्वारा‍ऄग्रेजीत‍की‍गइ‍ुूची‍में‍परराधवन/पररातवन‍ूते ‍ु दकुी‍भी‍जुफाररि‍कज‍िाजमल‍दकया‍जाएगा, यदद‍आुे‍ईजचत‍और‍केंद्र‍ुरकार‍द्वारा‍ुाावजजनक‍जूत‍में‍माना‍जाता‍ू।, ऄनलु ग्नक 12: ुर्नाु‍और‍ररपये र‍ुबं धं ी‍ईद्यजग‍की‍ुचू ी‍(एम1) 1. एयर‍कंडीिनर‍पाट्ुव। 2. एल्यूमीजनयम‍दरााजे‍/‍जखड़दकयां‍/‍दफरटग‍/‍फनीचर। 3. ुाआदकल‍का‍ुंयजजन‍और‍मरम्मत। 4. ऑटज‍पाट्ुव। 5. बल्ब‍(ब,टरी)। 6. ुाआदकल‍च,न/ताले। 7. डायमंड‍करटग‍और‍पॉजललिग‍का‍काम। 8. आलेजक्रक‍दफरटग‍(जस्ट्ाच, प्लग‍जपन‍अदद) 9. आंजीजनयररग‍ाकव 10. फाईंड्री‍(ईद्यजग‍जाभाग/डीपीुीुी‍की‍जनधावररत‍ुीमा‍के‍ऄनुु ार‍लघु‍जॉब‍ाकव)। 11. रेदफ्रजरेिन‍द्वारा‍(कजल्ड‍स्ट्टजरेज‍के‍जबना)‍अआुक्रीम‍और‍ठंडा‍पानी‍ 12. बफव‍(अइु)‍के‍बक्ुे‍और‍कूलर‍बॉडीज़। 13. लजू‍ेकी‍जग्रल‍और‍डजर‍मेककग। 14. जूट‍ईत्पाद। 15. चाकू‍बनाना। 16. ुंगमरमर‍पत्थर‍की‍ास्ट्तुएाँ। 17. धातु‍ल,थ‍करटग। 18. मजटर‍ााआंलडग‍ाक्ुव। 19. स्ट्टील‍लॉकर 20. स्ट्टील‍लस्ट्प्रग्ु। 21. रटन‍बॉक्ु‍बनाना। 22. रांुफामवर‍कार। 23. टीाी, रेजडयज‍ररकाडरव ‍अदद. 24. टीाी‍/‍रेजडयज‍/‍रांजजस्ट्टर‍केजबनेट। 25. टाआपराआटर‍पाट्ुव‍जनमावण‍और‍ऄुेंबली। 26. पानी‍के‍मीटर‍की‍मरम्मत। 27. ाेलल्डग‍ाक्ुव। 28. तार‍जनरटग। 29. लकड़ी‍फनीचर‍ाक्ुव। 30. ुूचना‍प्रौद्यजजगकी‍ुक्षम‍ुेााए‍ं और‍कंप्यूटर‍पाट्ुव नजटः‍य‍े ुभी‍ईद्यजग‍गर, -खतरनाक‍और‍गर, -प्रदीू णकारी‍प्रकृजत‍के‍ूोंग,े और‍आु‍श्रेणी‍की‍ुभी‍औद्यजजगक‍आकाआयों‍कज‍ प्रदीू ण‍जनयंत्रण‍प्राजधकरणों‍द्वारा‍जनधावररत‍मानकों‍कज‍परू ा‍करना‍ूजगा।[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍ऄुाधारण 333 ऄनलु ग्नक 13:‍1962‍ु‍ेपाू ‍वजबल्डऄप‍रेजजडेंजियल‍एंड‍ररूज, बजलटेिन‍कॉलजजनयों‍की‍ुचू ी 1.‍ऄलीगंज 29. मुल्तान‍नगर 2. ऄन्धा‍मगु ल 30. नानकपुरा 3. बलबीर‍नगर 31. जनकल्ुन‍माग व 4. भारत‍नगर 32. न्यू‍राजेन्द्र‍नगर 5. बी.के.दि‍कॉलजनी 33. ओल्ड‍राजेन्द्र‍नगर‍ 6. ददलिाद‍गाडनव 34. ओरम‍लाआन्ु 7. गांधी‍नगर 35. पटेल‍नगर‍(इस्ट्ट) 8. गीता‍कॉलजनी 36. पटेल‍नगर‍(ाेस्ट्ट) 9. गुलाबीबाग 37. पटेल‍नगर‍(ुाईथ) 10. आंद्रपुरी 38. प्रताप‍नगर 11. जंगपुरा‍-‍ए 39. प्रेम‍नगर 12. जंगपुरा‍-‍बी 40. पंजाबी‍बाग 13. जंगपुरा‍एक्ुटेंिन 41. राजौरी‍गाडवन 14. जााूर‍नगर 42. राणा‍प्रताप‍बाग 15. कालकाजी 43. रमेि‍नगर 16. कमला‍नगर 44. राम‍नगर 17. करजल‍बाग 45. रजूताुनगर 18. ककग्ुाे‍कैंप 46. रूप‍नगर 19. कीर्नत‍नगर 47. ुराय‍रजजूल्ला 20. दकिनगंज 48. िाूदरा 21. दकिन‍नगर 49. िजि ‍नगर 22. लाजपत‍नगर‍-‍I ुे‍IV 50. िेख‍ुराय 23. मलकागंज 51. जिााजी‍पाकव 24. मालाीय‍नगर 52. ुुभाी‍नगर 25. मानुरजार‍गाडवन 53. जतलक‍नगर 26. मॉडल‍बस्ट्ती 54. जतमारपुर 27. मॉडल‍टाईन 55. जतूाड़‍-‍I और‍II 28. मजती‍नगर‍ 56. जानजबापुरी 57. जाजय‍नगर334 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Annexure 14: Service Plans List of Annexures ANNEXURE I: SERVICE PLAN - DELHI JAL BOARD (DJB) ANNEXURE II: SERVICE PLAN - IRRIGATION AND FLOOD CONTROL DEPARTMENT (I&FCD) ANNEXURE III: SERVICE PLAN - DELHI CANTONMENT BOARD (DCB) ANNEXURE IV: SERVICE PLAN - EAST DELHI MUNICIPAL CORPORATION (EDMC) ANNEXURE V: SERVICE PLAN - SOUTH DELHI MUNICIPAL CORPORATION (SDMC) ANNEXURE VI: SERVICE PLAN - NORTH DELHI MUNICIPAL CORPORATION (NORTH DMC) ANNEXURE VII: SERVICE PLAN - NEW DELHI MUNICIPAL COUNCIL (NDMC) ANNEXURE VIII: SERVICE PLAN - DEPARTMENT OF ENVIRONMENT, GNCTD AND DELHI POLLUTION CONTROL COMMITTEE (DPCC) ANNEXURE IX: SERVICE PLAN - DEPARTMENT OF POWER, GNCTD ANNEXURE X: SERVICE PLAN - DELHI TRANSCO LIMITED (DTL) ANNEXURE XI: SERVICE PLAN - INDRAPRASTHA GAS LIMITED (IGL) ANNEXURE XII: SERVICE PLAN - DEPARTMENT OF INFORMATION AND TECHNOLOGY, GNCTD[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 335 ANNEXURE I: SERVICE PLAN – DELHI JAL BOARD (DJB)336 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)][भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 337 PERSPECTIVE PLAN FOR INFRASTRUCTURE SERVICE FOR DELHI - 2041 AGENCY: DELHI JAL BOARD (DJB) (A) WATER SUPPLY 1. Present water demand Delhi Jal Board (DJB) had earlier considered per capita potable water requirement @ 60 GPCD. As per the projected population of 23 million for 2021, the water demand is estimated to be 1380 MGD. 2. Water demand projections for 2041 DJB anticipated that by the year 2041 about 1500 MGD potable water @ 50 GPCD (225 LPCD) for a population of 30 million (3 crore) shall be required. For future planned developments, availability of potable water will be restricted to maximum of 40 GPCD (180 LPCD). 3. Basis for adopting per capita water requirement: Due to limited water resources, demand for potable water has been rationalized by use of non-potable recycled water of desired quality standards for different non-potable uses. For future planned developments, availability of potable water will be restricted to a maximum of 40 GPCD as given in the Table - 1. Table 1 Potable Water Demand as per use for future developments Potable Water Demand Quantity Residential 135 LPCD Non-Residential (Commercial/Institutional etc. including 5 LPCD for 20 LPCD floating population) Fire Demand 2 LPCD Transmission Losses @ 15% 23 LPCD Total 180 LPCD (Say 40 GPCD)338 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Water requirement for toilet flushing purposes in residential developments and non- residential developments (about 75LPCD) shall have to be met by use of non-potable recycled water of desired quality standard with dual piping system. Water demand for industrial process water & horticulture/gardening/agriculture purposes shall also need to be necessarily met out from recycling of wastewater of desired quality standards. Necessary infrastructure for enabling use of recycled water such as dual piping and plumbing, etc. is to be ensured by DDA / Land Developing Agencies. For new buildings (land pooling / redevelopment), dual piping maybe enforced by the building plan sanctioning authorities. The plumbing infrastructure for dual piping is very difficult and cost intensive to implement in existing developments. Therefore, Delhi Jal Board has assessed that with potable water demand of 40 GPCD in future planned developments, total requirement of potable water at the city level can be progressively brought down from 60 GPCD to 50 GPCD. 4. Action Plan for Water Augmentation for 2041 It is well known that the fresh water resources for the National Capital Territory of Delhi are limited and the situation is increasingly becoming challenging. Therefore, a twin- pronged strategy for water supply in the future focuses on the augmentation of both, ground water and surface water resources, while also emphasizing the need for increased wastewater treatment and reuse, rainwater harvesting initiatives, restoration of water bodies, etc. Water Augmentation Plan for NCT of Delhi envisaged by Delhi Jal Board is given here under Table - 2: Table 2 Water Augmentation Action Plan Proposed amount of water augmentation (in MGD) Water Sources Source of water 2021- 2026- 2031- 2036- 2026 2031 2036 2041 Short to Medium term Plan (248 MGD) 1. Ground a. Installation of additional Tube-Wells in 25 Water Palla Area (200 Tube-Wells)[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 339 Extraction b. Aquifer Recharge and Ground Water (113 MGD) Extraction from Water Bodies / Lakes 23 (including reuse of treated effluent) c. Ground Water Extraction from Localized Area having High Ground Water Levels d. Additional Ground Water Recharge 65 Projects in Palla Areas e. Setting up Advanced WTPs at Okhla with Ground Water Sources from Ranny Wells 2. Surface Discharge of high quality treated effluent in Water (70 the River Yamuna at Palla and its 70 MGD) reclamation at Wazirabad as raw water source (Reuse of treated effluent) 3. HP share of Additional Yamuna water to Delhi as per unutilized the MOU with Himachal Pradesh for water in utilization of their un-utilized Yamuna river Yamuna water allocations. 65 share (Surface Water - 65 MGD) Medium to Long term Plans (336 MGD) 4. Substitution Utilization of 51 cusec of allocated of 51 cusec irrigation water to Delhi at Hathnikund / of Yamuna Tajewala for its drinking water needs Water for 16 irrigation purposes (16 MGD) 5. Raw water MOU with Uttar Pradesh for additional from Uttar river water to Delhi in lieu of adequately 140 Pradesh treated effluent by Delhi for their irrigation340 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] (140 MGD) needs 6. Upstream Upstream Storages – Renukaji, Lakhwar & Storages (180 Kishau dam projects MGD) (*This is a highly tentative calculation. However, exact allocations will be decided by UYRB where Delhi hopes that drinking 180* water requirements will be given primacy in allocations & return flow by Delhi will be considered in allocation of Yamuna water in Delhi for its consumptive needs.) Present Availability of Water 935 MGD Additional Water Augmented by 2041 584 MGD Total Water Availability by 2041 1519 MGD DDA has to earmark land required for water supply infrastructure and has to provide land to Delhi Jal Board for setting up Water Treatment Plants and Primary UGRs/Master Balancing Reservoirs with Booster Pumping Stations. JICA Study Report on Improvement of Water Supply in Delhi has suggested Master Plan Development Zones wise Primary UGRs/MBRs with pumping capacities totalling to 1560 MGD and four new Water Treatment Plants. Status of land for the proposed four new Water Treatment Plants is given in Table – 3. Table 3 Land Requirement for new WTPs Master Plan Sr. No. Name of WTP Capacity (MGD) Status of Land Development Zone 1 Iradat 80 Available with DJB P-1 2 Dwarka Phase II 50 -do- L 3 Najafgarh 75 DDA has to provide L 4 Chattarpur 80 -do- J The land requirement includes additional provision of 15% & 25% for WTPs and UGR with BPS respectively for future expansions and ancillary infrastructure.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 341 In addition, Water Treatment Plants for another 300 MGD would require to be setup for catering to the projected population of 30 million by 2041. Land for these WTPs will need to be earmarked as per norms mentioned below, depending on the source of raw water and the planned development to be carried out.  For Water Treatment Plants:  80 MGD (363 MLD) capacity – 300 m2/MLD  40 MGD (182 MLD) capacity – 400 m2/MLD  For underground Reservoirs with Booster Pumping Stations:  5 ML Capacity – 700 m2/ML  50 ML Capacity – 600 m2/ML Assessment of land requirement should not be limited by the projected population for MPD-2041, but need to consider design period i.e. population projections for 2051 and further future urban expansions. 5. Water Conservation Initiatives by DJB 5.1. Groundwater Recharge through Rain Water Harvesting: Central Ground Water Board has assessed that potential annual rainwater run-off of 24.39 MCM (5,372MG) out of the total of 175 MCM (38,546 MG) available for recharge areas in Delhi. This is proposed to be realized through construction of check dams and artificial recharge structures in rainwater drains. Annual potential of rooftop rainwater harvesting is assessed to be about 14.69 MCM (3,236MG). RWH Structures are integral to the rainwater conveyance system. DJB has also published guidelines for encouraging adoption of Rooftop Rain Water Harvesting. DJB has identified 89 buildings maintained by PWD/DMCs/GoI/DDA, etc.in 2019, where RWH system is feasible to be installed.342 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Eleven rain centers in the field and one at the Headquarter have been setup to facilitate the applicants to install rainwater-harvesting system. Nodal officers’ in-charge of these rain centers has also been appointed. Intensive awareness program for publicity of Rain Water Harvesting is also carried out from time to time. 5.2. Revival and Rejuvenation of Existing Water Bodies and Creation of Artificial Water Bodies: Traditional water bodies help sustain the city’s eco system and act as a catalyst to its growth and development, and additionally their rejuvenation contributes to the aesthetics of the city. Majority of Delhi’s traditional water bodies suffer from encroachment, illegal construction, over-extraction and water pollution. In order to address these issues, DJB has taken up the work of revival of 240 water bodies with an aim to recharge ground water. The scheme amounting to Rs. 37,678.92 lakh to revive 155 water bodies was approved by DJB in December 2018, out of which, work for 50 water bodies have already been awarded. Raw sewage is proposed to be treated and utilized to recharge ground water. DJB is also creating artificial Lakes at PappanKalan Waste Water Treatment Plant (WWTP), Dwarka WTP, Timarpur Oxidation Pond, Rohini WWTP and Nilothi WWTP. About 46.5 MGD of treated effluent will be utilized after due treatment to fill the lakes for recharge of ground water. It is estimated that about 50% i.e. 23.25 MGD of water would be available as raw water source from extraction of ground water by installation of tube- wells in the surrounding areas of these artificial lakes. Status on revival of existing water bodies and creation of new lakes is given in Table-4 &5 Revival/rejuvenation of water bodies will involve following activities:  Sewage flow into the identified water bodies will be trapped or stopped.  Treated effluent from a nearby decentralized Waste Water Treatment plants will be used for rejuvenation of dry water bodies or DJB will install bioremediation Waste Water Treatment Plants to clean waste water coming into the water bodies.  The surrounding of water bodies will be developed and people residing near-by will be given access to the water bodies.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 343 Table 4 Status of Works on Existing Water Bodies No. of Water Awarded / S. Status of Water Bodies / Artificial Estimated Timelines No. Bodies/Artificial Lake Lakes Cost(Lakh) 1 In progress 46 7942.05 Works will be progressively Proposal under completed in 2 Preparation for call of 39 10639.22 phased manner tenders in next 3 to 4 To be executed by M/S 3 4 1348.25 years. CSIR-NEERI as PMC Proposed to be carried out through in-house 4 66 17749.40 technology on DBO basis Water Bodies received from IFCD, Proposed to 5 be carried out through 85 22859.08 in-house technology on DBO basis Total 240 60538.00 Table 5 Status of New Artificial Lakes to be created Estimated Quantity Quantity of available for Treated Status of Artificial use as Raw S. No. Effluent to be Status Timelines Lakes Water Source Utilized from Extraction (MGD) of Ground Water (MGD) 1 At DWARKA WTP In Works will 15 7.5 Progress be progressively 2 At Sector -25 Rohini 5.5 2.75 In344 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] WWTP Progress completed in phased 3 At Timarpur In 6 3 manner in Oxidation Ponds Progress next 3 to 4 4 At Nilothi WWTP Proposal 15 7.5 years. revised 5 At Pappankalan In 5 2.5 WWTP Progress 5.3. Utilization of Treated Wastewater: Present utilization of treated effluent in NCT of Delhi is about 90MGD, apart from the discharge of 267 MGD of treated effluent as return flow in the river Yamuna downstream of Wazirabad Barrage as per the present interim distribution of Yamuna water by UYRB. Further, proposed utilization of Treated Effluent to the extent of about 436-466 MGD is given in Table-6 as under, which will be undertaken in a phased manner. Table 6 Proposed Utilization of Treated Effluent Sr. Proposed Quantity Timelines Remarks No. Utilization (MGD) 1 Coronation 70-100 Dec-2023 To be used as source of Raw Pillar STP Water after tertiary treatment. This proposal has been agreed in principle by UYRB. The tenders for consultant have been received on 07.01.2021 and likely to be awarded by Feb, 2021. 2 Auchandi & 20 Jun-2023 Exchange with Haryana in Jaunti lieu of irrigation component. Regulator for This proposal is being irrigation use in considered by UYRB and joint NCT of Delhi inspection with UYRB was done on 08.01.2021. 3 Exchange in 140 (3-4 years after Exchange of raw water in lieu lieu of raw MOU with UP) of Treated Effluent from water with U.P 2024-25 Okhla STP. Matter is being[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 345 pursued with U.P Govt. The feasibility report submitted by UP irrigation, under examination. 3 Committed use 18 At present about Committed use by PPCL at by PPCL 7 MGD is being Rithala. taken by PPCL at their Bawana plant however, keeping in view their future expansion plans a provision of additional 18 MGD is kept for their committed use. 4 All water 188 Dec-2024 bodies, forests etc. Total 436 -466 WAPCOS (India) Limited, a Government of India Undertaking, has submitted its report with identified proposed Recharge Schemes/Projects in NCT of Delhi such as Check damns/Nala bunds in Ridge area, Roof-top rainwater harvesting schemes in institutional and commercial buildings, percolation ponds, lake basins, aquifer storage and recovery wells, parks and gardens recharge regions, flyovers and city roads, Yamuna flood basin areas, etc. to be carried out by respective agencies. 6. Efforts for Service Level Improvements by DJB Delhi Jal Board has taken numbers of steps to improve sanction of water and sewer connections in a time bound manner and to increase billing and revenue collection efficiency such as implementing Revenue Management System (RMS), mobile application for self-billing and online payments, doorstep delivery of public services, time bound346 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] grievance redressal, simplification of procedure of sanctioning of new water/sewer connection, strict actions against wastage of water, etc. DJB endeavour is to provide equitable distribution of water to the citizens of Delhi and to meet their 24x7 demand of potable water continuously at adequate pressure. For this, Delhi Jal Board is revamping water supply distribution infrastructure including formation of District Metered Areas for reducing non-revenue water and minimizing physical loss of precious potable water through leakages. Installation of bulk flow meters for water auditing, replacement of old/damaged water pipelines, District Metered Areas (DMAs), reforms on revamping water distribution infrastructure under existing Chandrawal and Wazirabad WTPs, installation of SCADA systems at WTPs, UGRs and in water distribution systems, etc. are few of the DJB initiatives in this direction. Several steps are being taken to overcome frequent Ammonia pollution in river Yamuna by DJB. Delhi Jal Board also has setup Quality Control Cell to check quality of raw water and treated water. (B) WASTEWATER / SEWERAGE 1. Wastewater Projections for 2041 Estimated wastewater generation for a population of 30 million (water supplied @50 GPCD) at 80% of supplied water comes out to be 1200 MGD. 2. Perspective Sewage Disposal Plan for 2041 Perspective Sewerage Disposal Plan for 2041 comprises of a multi-dimensional approach with various crucial verticals like laying of sewerage system in unsewered areas of Delhi, rehabilitation of existing STPs, construction of new STPs or at mouth of the Drains, construction of Decentralized STPs in various parts of Delhi, up-gradation of existing STPs to higher parameters of BOD: TSS <10:10 and Zero Liquid Waste Discharge (ZLWD) policy in Land Pooling Area etc. The sewerage development plan for 2041 draws heavily from the SMP- 2031 and is a continuation of the sewerage management action plan being undertaken by DJB. Therefore, with suitable need based modifications depending on the actual growth patterns and spatial distribution, the Sewerage Master Plan -2031 prepared by DJB, will be able to fulfil the requirement of MPD-2041.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 347 Based on various physical factors and zoning criteria, the whole NCT of Delhi has now been delineated into 12 (twelve) sewage-drainage zones, instead of six zones earlier, excluding the Cantonment and Airport areas. The zones have been primarily delineated based on the wastewater generation from each zone/sub zone, the capacity of existing WWTPs/WWPSs and land availability for any additional WWTP/WWPS, if required. Sewerage Schemes for each Zone are prepared considering the existing sewerage infrastructure, proposed sewerage infrastructure under various projects, development plans for a particular area, population projections, amount of waste water generation, land availability for proposed sewerage infrastructure and site feasibility. The following table enlists the proposed delineated zones and sub zones: S. No. Drainage Zone Sub Drainage Zone Yamuna Vihar (YV) Zone 1 Shahdara (SHD) Sonia Vihar (SV) Kondli (KN) Okhla (OK) Zone 2 Okhla (OKH) Tajpur (TP) Zone 3 Keshopur (KSP) Keshopur (KP) Rithala (RT) Zone 4 Rohini-Rithala (RR) Rohini (RH) Coronation Pillar (CP-1) Zone 5 CORONATION PILLAR (COR) Coronation Pillar (CP-2) Dwarka (DK-1) Zone 6 DWARKA (DWK) Dwarka (DK-2) Najafgarh (NJ) Jhuljhuli (JH) Zone 7 NAJAFGARH (NJF) Dhichaon Kalan (DK) Somesh Vihar (SV) Zone 8 NILOTHI (NLT) Nilothi (NT-1)348 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Nilothi (NT-2) Narela (NR) Zone 9 NARELA (NRL) Palla (PL) Zindpur (ZP) Mahrauli (MH) Vasantkunj (VK) Zone 10 SOUTH DELHI (SD) Ghitorni (GH) Mahipalpur (MP) Kapashera (KH) Fatehpurberi and Chandanhola (FC) Zone 11 OUTER SOUTH DELHI (OSD) Rajpur Khurd (RK) Kanjhawala (KJ) Zone 12 KANJHAWALA-BAWANA (KB) Bawana (BW) 3. Sewage Treatment Augmentation Action Plan for 2041: Detailed Perspective Plan for augmentation of sewage treatment capacity to cater to the projected requirements of year 2041 is as under: S. No. Particulars Total (MGD) 1. Present sewage treatment capacity 597 STPs under up gradation / reconstruction through funding from 2. NMCG, YAP-III and AMRUT (Okhla -30 MGD, Kondli-20 MGD, 110 Coronation-40, Rithala-20 MGD) 3. Construction of 56 DSTPs in various parts of Delhi 92 Construction of STPs at Mouth of the Drain (10 MGD Mori 4. 40 gate, 10 MGD Delhi Gate, 20 MGD Barapulla) Construction of 7 MGD STP at Sonia Vihar and 25 MGD STP 5. 32 at Rohini Augmentation of treatment capacity through PAC (Poly 6. 89 Aluminum Chloride) extended aeration and construction of[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 349 DSTP based on growth the population in the developing area. Land Pool area proposed to be designed on Zero Liquid Discharge basis. Therefore, DSTPs are to be constructed by 7. 240 Land Pooling agencies for 75 lacs population having water supply @ 40 GPCD @ of 80% Water supply. Grand Total 1200 MGD 3.1. Augmentation of Sewage Treatment Capacity to 707 MGD by December – 2022 as per following: Total Sewage Present Net S. Name of Treatment capacity capacity Increase Augmentation Plan No. STP After augmentation (in MGD) (in MGD) (in MGD) Coronatio Construction of new 1 30 70 40 n Pillar STP of 70 MGD Rehabilitation of Rithala 2 20 40 20 Rithala STP phase-I phase-I under YAP-III Rehabilitation of 3 Kondli 70 90 20 Kondli STP under YAP-III Construction of new 4 Okhla 140 170 30 STP of 170 MGD under YAP-III Total 260 370 110 Enhancement of Treatment 110 MGD by December 2022 3.2. Upgradation of Existing STPs to BOD: TSS<10:10: 6 STPs (Pappankalan, Nilothi, Kapashera, CWG Village, Delhi Gate & Chilla) with total 70 MGD presently at 10:10. Upgradation Work in progress in 10 STPS with 289 MGD capacity- targeted completion by Dec-2022 in phased manner.350 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] S.No Location Capacity Targeted completion 1 Kondli STP Phase I 10 MGD December 2021 2. Kondli STP Phase II 25 MGD December 2022 3. Kondli STP Phase III 10 MGD December 2021 4. Yamuna Vihar STP 10 MGD December 2022 Phase II 5. Okhla STP Phase I 30 MGD In place of these four STPs, a New STP of 124 MGD capacity is under construction which is targeted to be completed by December 2022 6. Okhla STP Phase II 12 MGD 7. Okhla STP Phase III 37 MGD 8. Okhla STP Phase IV 45 MGD 9. Rithala Phase-I 40 MGD December 2022 subject to grant of tree cutting permission from Forest department. 10. Coronation Pillar 70 MGD In place of existing Coronation Pillar Phase-I,II& III (30 MGD) , new 70 MGD STP at Coronation is under construction which is likely to be commissioned; 50% by March, 2021 100% by June 2021. Total 289 MGD 3.3. Up-gradation of balance Existing STPs with Parameters of BOD/TSS as 10/10 mg/l (including Bio-nutrient & pathogen removal & sludge management): Designed Design Expected S. Phase- Wise outlet Name of STP Capacity (in timelines of No. Breakup Parameters MGD) completion BOD/TSS 1 Rithala Phase - II 40 15/20 The completion 2 Okhla Phase-V 16 30/50[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 351 Phase-VI 30 20/30 period for up- 3 Kondli Phase - IV 45 20/30 gradation of 4 Keshopur Phase-I 12 20/30 STPs is 3 to Phase-II 20 30/50 4 years from the Phase-III 40 30/50 date of 5 Yamuna Vihar Phase – I 10 30/50 availability Phase-III 25 20/30 of funds. 6 Vasant Kunj Phase – I 2 30/50 Phase - II 3 30/50 7 Mehrauli Mehrauli 5 20/30 8 Narela Narela 10 30/50 9 Nilothi Phase – I 40 30/50 10 Najafgarh Najafgarh 5 30/50 11 Pappankalan Phase – I 20 30/50 12 Dr. Sen Nursing Dr. Sen 2.2 10/15 Home Nalla Nursing Home Nalla 13 Delhi Gate Phase – I 2.2 10/15 14 Rohini Rohini 15 30/50 15 Ghitorni Ghitorni 5 30/50 16 Molar-Bandh Molar- Bandh 0.66 30/50 Total 348.06 MGD 3.4. Construction of new STPs: Following new STPs are proposed to be constructed at new locations and at the mouth of the drains. Details are as under: Name of S. No Capacity MGD Timeline Remarks STP Process of appointment of 1 Sonia Vihar 7 December-2024 consultant is in process. 2 Rohini 25 December-2024 Estimate under preparation352 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Land is required from DDA/ 3 Delhi Gate 10 December-2024 Revenue Department Allotment of land is awaited 4 Mori Gate 10 December-2024 from DDA. Allotment of land is awaited 5 Barapulla 20 December-2024 from DDA. Total 72 MGD 3.5. Construction of new Decentralized Sewage Treatment Plants (DSTPs) (92 MGD): As per Sewerage Master Plan- SMP 2031, 32 Nos. STPs are to be constructed, out of which, 14 STPs are to be constructed in Najafgarh Drainage Zone and 18 STPs in Narela, Okhla, Outer South Delhi, Kanjhawala, Bawana, Shahdara Zone. Due to land constraint, it has been decided to construct Decentralized STPs at 42 locations in place of 18 STPs. For setting up 56 plants (42 d-STPs + 14 STPs) and 02 STPs at the mouth of drain, land at 73 locations is required, which includes 15 locations for Sewage Pumping Stations (SPS). Out of total 73 locations, land at 10 locations is already available with DJB and for the balance 63 location, land will have to be made available by different agencies as follows: S.No. Name of the Department / Agency Land Locations Land and Building Department, GNCTD after 1 13 locations acquisition from private person 2 Gaon Sabha lands 11 locations 3 DDA 39 locations Grand Total 63 locations 3.6. Status of Decentralized Sewage Treatment Plants: Capacity S. No. Name of STPs Timeline Remark (MGD) 1. 14 (7+7) STPs in 32 18 to 30 months Out of 14 locations, land is Najafgarh after approval of available only at 08 Drainage Zone funding of balance locations and land at STPs by NMCG balance 06 locations is yet and allotment of to be allotted. land[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 353 2. 42 Decentralized 60 24 to 36 months Land for construction of 42 STPs at various after allotment of DSTPs and 07 SPS have locations. (+7 land been identified at various SPS) locations and it is still in the process of allotment by Revenue department of GNCT Delhi. Necessary action will be taken by DJB after allotment of land. Total 92 MGD 3.7. Extension of network to un-sewered areas: The un-sewered area in Delhi mainly consists of unauthorized colonies. As per the list circulated by UD Dept., GNCTD, there are 1799 unauthorized colonies in Delhi. The present status and action plan for providing sewer network in these colonies is tabulated below: Commutative Status as on S. Status November Timeline Remark No. 2020 (Numbers) 1. Sewer line 561 Completed laid and notified 2. Work of 595 Up to Dec, 2024 in sewer phased manner network is in progress 3. Colonies 131 About 03 years The work shall be taken up where NOC after receipt of after NOC from Forest is awaited/ NOC / Clearance Department/Ozone O-Zone from concerned department 4. Colonies 512 For laying The work shall be taken up where sewerage network after allotment and sewerage in these colonies 3 possession of land by DDA354 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] network is to years-time will be & Revenue Dept. As sewer be laid along required after network cannot be laid in with availability of land isolation without first Decentralize for DSTPs. identifying and taking d STP possession of land for constriction of SPS and decentralized STPs. Total 1799 3.8. Sewage Generation anticipated in Land Pooling Area: As per Zero Liquid Discharge (ZLWD) policy for sewers, Decentralized STPs are to be constructed within premises of the Building / Complex in DDA Development/ Land Pooling Areas. Since Sewage is proposed to be treated within the Land Pooling Area, no centralized sewerage treatment system is required for Land Pooling Areas. Treated effluent from DSTPs within sector / Housing Complex will be reused for flushing, gardening and other secondary purposes to the maximum extent and unutilized treated effluent, if any may be utilized for recharging nearby Water Bodies etc. For Land Pooling Areas, Decentralized Sewage Treatment Plants (DSTPs) will be required to be constructed and provision for land for DSTPs will required to be made in DDA Master Plan – 2041 as per Sector Layout Planning. Land requirement norms for construction of STP/SPS/EPS will be as under: a) Land requirement for STP including Sewage Pumping Station & Effluent Pumping Station for capacity up to 22.7 MLD (up to 5 MGD) - 650 m2/MLD. b) Land requirement for STP including Sewage Pumping Station& Effluent Pumping Station for capacity above 22.7 MLD (above 5 MGD) - 1100 m2/MLD. c) Land requirement of 50 m2/MLD for construction of Sewage Pumping Station and 50 m2/ MLD required for Effluent Pumping Station. 4. Initiatives taken by Delhi Jal Board for efficient sewerage management and mitigation of pollution in drains/river: 4.1. Interceptor Sewer Project (ISP) The Interceptor Sewer Project (ISP) has been conceptualized for abatement of pollution in the River Yamuna. Under Interceptor Sewer Project, 108 Nos of the drains are trapped and provision of trapping of about 242 MGD flow is being made. Out of proposed 242 MGD, provision for trapping of 238 MGD (98.35%) has already been made. Out of this, 158.70 MGD wastewater is being trapped and treated at the various STPs in the command.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 355 However, the physical works under ISP is almost completed and facility of trapping 242 MGD will be in place, but the actual treatment of this entire quantity of sewage will be done in phased manner only after the completion of the Coronation Pillar, Rithala and Kondli STPs by December 2022. 4.2. Setting up of Decentralized STPs by Institutions/ Schools/ Agencies DJB has framed a policy for Setting up of DSTPs by individual Schools/Institutions/ Complexes/ Parks/ Hospitals etc. to use the treated effluent for horticulture purpose in their parks. 4.3. Enhanced Use of Treated Effluent In pursuit of promoting the use of treated effluent for non-potable purposes, DJB has installed filling points for treated effluent at almost all WWTPs. The Biochemical Oxygen Demand (BOD) stands at ≤20 ppm and the Total Suspended Solids (TSS) stands at ≤30 as well, making it usable for non-potable purposes. DJB has also written to and conducted workshops with a number of Government agencies such as DMRC, PWD, NDMC, SDMC EDMC, NTPC, Indian Railways (for their wagon and carriage washing) and others, encouraging them to use treated effluent. Also, through different incentives in its new policy, DJB is aiming to increase utilization of the treated effluent. 4.4. Rehabilitation of peripheral sewers in Delhi Most of the peripheral sewers are too old and suffering from severe structural deterioration and have outlived their economical life span thereby, exhibiting operational deficiencies. To overcome these problems, it has been proposed to rehabilitate the peripheral system, so that entire sewage generated in city could be transferred to STPs for optimal utilization of installed capacity of plants and reduction of pollution in river Yamuna. Therefore, DJB intends to take up the rehabilitation of peripheral sewers, which are dysfunctional or partially functional due to multitude of problems such as settlement of sewers, sewage gas related structural failures, leaking joints, disjointed sewer pipes, heavy siltation, blockage due to indiscriminate throwing of rubbish and debris into manholes, illegal discharge of trade waste and collapsed sewers. The Rehabilitation of peripheral sewers under Phase -I comprises of diameter ranging from 450mm to 1400mm having length of about 162 km. The Project has been divided into 6 packages and, work is in progress and likely to be completed by 2022. 4.5. Providing House Service Sewer Connection Delhi Jal Board has started a scheme to encourage all such consumers who live in sewered areas but have not taken sewer connections to apply and obtain sewer356 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] connections. Under this scheme, all those who applied for a new sewer connection before 31-03-2020 were not charged any amount and DJB provided them sewer connections at its own cost. All installation charges and road repair charges are to be reimbursed by Delhi Government to DJB as grant-in-aid under “Mukhyamantri Muft Sewer Connection Yojna.” Under this scheme, about 4.84 lac sewer connections have been sanctioned/ regularized. 4.6. Deployment of Mini Sewer Cleaning Machines DJB has deployed 200 Nos. specially fabricated tailor made Sewer Cleaning machines in order to avoid hazardous operation of sewer cleaning by manual labour. The sewers in narrow lanes can be cleaned mechanically without man entry now. 4.7. Septage Management Rules 2018 DJB has made efforts to implement the septage management rules in Delhi ‘Delhi Water Board Septic Tank Waste Management Regulations Act -2018’ under Delhi Water Board Act-1998 for collection, transportation and disposal of waste of septic tank and matter connected therewith. As per the Septage Regulation 2018, DJB has issued 208 Nos. Licenses to the private tanker operators and they are engaged in the collection and disposal of Septage from the individual households from unauthorized colonies/ unsewered areas. The average collection of Septage is approximate to 6-7 Lac litres per day. 4.8. Management of wastewater in storm-water drains in Delhi: As per directions of Hon’ble NGT, Integrated Drain Management Cell (IDMC) has been constituted on 17.03.2020 under the Chairmanship of Chief Secretary of Delhi for remediation and management of all drains of Delhi with representatives of all Drain owning Agencies (DoA). The mandate of IDMC is to prepare a comprehensive action plan for “Alternate Technologies for Management of Waste Water in Drains” in Delhi as per the techno- economic evaluation of the multiple methodologies and techniques suggested in the reports of CPCB. DJB is also making concerted efforts to trap the sewage flowing in the 18 major drains directly out falling into River Yamuna in the Delhi stretch between Wazirabad to Okhla by diverting sewage to nearest STPs. out of 18 major drains 13 drains have already been trapped.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 357 ANNEXURE II: SERVICE PLAN - IRRIGATION AND FLOOD CONTROL DEPARTMENT (I&FCD)358 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] SERVICE PLAN for DRAINAGE MANAGEMENT IRRIGATION AND FLOOD CONTROL DEPARTMENT (I&FC) 1. MANAGEMENT STRATEGY Special recommendation There should be a single institution that bears an overall responsibility of the management of the total storm water drainage system, within NCT of Delhi, for effective administrative management. Dredging and cleaning of drains by I&FC department I&FC Department has large banks along major drains for deployment and movement of machinery and desilted earth is also kept on these banks till its final disposal, either by filling in low lying areas/depressions along drains or shifting into earmarked sanitary land fill sites. Strengthening of embankments of drains of I&FC department Before onset of monsoon, all the embankments of I&FC Department drains are checked in respect of their stability and necessary restoration/repair work, as needed is carried out by respective divisions of I&FC Department. A certificate in this regard is also forwarded by concerned engineers to Head Quarter. I&FC Department also has departmental machinery for such restoration/ strengthening work in the form of hydraulic excavators and dozers. Remodelling of various drains The embankment strengthening/remodelling proposals as of now and their current status in respect of I&FC Department Drains is attached as Annexure-II (a). The above-cited table shows that embankment of most of the drains are in good and stable condition and there is no need for their strengthening. Similar situation is found in respect of need of remodelling of drains. The work of remodelling is in progress at Najafgarh Pond Drain and Bund Drain. For some drains, like Escape Drain No. 1 & Relief Drain, work of remodelling is required but there are land constraints. Remodelling of KSN drain is required as most of the catchment area of this drain is urbanized and many unauthorized colonies were also developed and are being developed. Due to this, there is no scope for percolation of storm water, which has to be carried by this drain. Besides this, due to lack of sewerage[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 359 network in unauthorized colonies the discharge of sewage, household waste and other wastewater are also flowing into KSN drain through various drains of other Agencies. There is no land available for remodelling since the adjacent area on both sides is developed and urbanized. Hence, there is a need, to acquire land for remodelling of KSN drain. For other drains, the work of remodelling and strengthening shall be taken up as per their requirement in future. Canals and their management To keep up the uninterrupted flow of irrigation water to the irrigated land in Delhi, all repair and maintenance works, cleaning/ dredging /desilting, strengthening of embankments are being taken up as per requirement and necessity. Delineation, conservation and management of buffers for all major I&FC drains There are 57 major drains owned and maintained by I&FC Department. The buffer land/ additional land width available along the drains for future development is tabulated and attached as Annexure-II (b). Troublesome drains There are eight troublesome drains, which are detailed out in the service plan report shared by I&FC Department: Sr. Drain Problems / Constraints Remedial Measures No. Name 1. Escape Drain flow being obstructed by The twin water mains may be shifted. Drain No. two water mains lying in the 1 drain itself, No space for De- silting for a stretch, Heavy silt from WTP, Bed level of the drain flat. 2. Biharipur Bounded on both sides with A parallel carriageway may be provided, Drain closely packed houses, No demolition of unplanned/ unauthorized space for movement of de- construction on either side. silting machine, Heavy dumping of MSW and cow dung.360 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 3. Bund Bounded on both sides with Bar screen has been placed, Bypass drain Drain closely packed houses, No constructed, Removing obstructions, A space for movement of de- parallel carriage way may be provided, silting machine, Heavy dumping demolition of unplanned/unauthorized of MSW and cow dung. construction on either side. 4. Relief No space for movement of de- A parallel carriage way may be provided Drain silting machine, Heavy dumping all along the length in the stretch from of MSW in the drain by the local CRPF Camp to Khajuri Chowk by resident, Daily dumping of considering demolition of unplanned / un waste by the hawkers. authorized construction on drain side. NHAI may be asked to remodel the drain in the entire length with proper outfall. 5. Kirari 106 unauthorized, un-sewered DDA shall have to divert their wastewater Suleman colonies contributing to all out falling into KSN drain at two points of Nagar categories of house hold waste, main DDA road drain to adjacent DDA Drain sewage and also dumping of drains. Three culverts of KSN drain shall MSW, During flood season the be demolished and adequate hume pipes residual treated water comes will be laid for increasing the water way with more silt due to which the and smooth discharge of wastewater. siltation occurs. 6. Pankha Heavy daily disposal of MSW A scheme for construction of RCC road drain and other household & market retaining wall on both sides, The M.S wastes, Non availability of Jalies have been erected over the bridges banks and access for to discourage the localities from throwing deployment of machines, of garbage, Joint survey with DJB and Presence of high tension BSES is occasionally conducted time to overhead electric line, time to cope with the ground realities, The Encroachment in the drain, MS boards being erected at vulnerable Heavy floating materials, silt, points to discourage people from dumping debris etc. from inlets/ out falling and throwing of household waste and drains, Local resistance for not garbage. Inviting specialized agencies to stacking the material in front of plan rejuvenation of drain. Deployment of their houses and shops Jal Rakshak. 7. Nasirpur Heavy daily disposal of MSW M.S Jalies have been erected over the Drain and other household &market bridges; MS boards are being erected at wastes, Non availability of vulnerable points, Inviting specialized banks and access for agencies to plan rejuvenation of drain, deployment of machine, R&D for specialized machinery for Presence of water pipeline, effective cleaning of drain, stopping of electric & Telephone cables in sewerage water into the drain, Deployment the water way, Presence of of Jal Rakshak, Installation of MS Jallies high tension overhead electric on the mouth of out falling drains. line, Encroachment in the drain,[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 361 Heavy floating materials, silt, debris etc. from inlets/ out falling drains, Non availability of space for stacking desilted materials, Local resistance for not stacking the materials in front of their houses and shops. 8. Asola Inefficiency of civic agency i.e. DJB may construct STP and lay sewer Drain MCD for collection of MSW from lines in the area. The MCD shall develop houses& markets, construction effective mechanism for collection of MSW of Dhalaos, Lack of civic sense of the household wastes and C&D wastes. and awareness among local R&D for specialized machinery for people. Lack of specialized effective cleaning of drain. Immediate machines fit for cleaning of the filling of vacant posts of technical and work drain in existing circumstance; charge staff. Stopping of sewerage water Lack of power to challan the into the drain. Spreading of general defaulters. awareness about health and hygiene among the people residing all along the drain. 2. FLOOD MANAGEMENT Apex Committee An Apex Committee has been constituted under the Chairpersonship of Hon'ble Chief Minister, Delhi to recommend, supervise and co-ordinate flood control measures in the National Capital Territory of Delhi. The Central Flood Control Room at LM Bund Office Complex, Shastri Nagar Delhi, remains in constant touch with the Control Rooms of different departments i.e. MCD’s, NDMC, PWD and DDA to receive complaints and take appropriate remedial action in case of drainage congestion on account of heavy rains. Disaster management control room at office of D.M. (East) remains functional for relief & rescue operations. In case of any need, the Divisional Commissioner may seek assistance from Army in controlling floods, evacuation of the marooned people, distribution of food supplies and other related matters.362 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Sector Committee Sector Committee is also constituted for each district, under the supervision of a Sector Officer of D.M. rank. The Sector Officer also acts as a link between the various departments, at District level, organized evacuation of the people, if necessary and to re- habilitate them in relief camps and distribution of relief supplies. Function of the Sector Committee: Immediately after its constitution, the Sector Committees will meet within the areas of their jurisdiction and plan the steps needed for dealing with the problems arising out of floods or drainage congestion. Flood Warnings The first warning is issued by Central Flood Control Room as soon as the discharge from Hathnikund Barrage exceeds one-lakh cusecs or Discharge at Manasi exceeds 3500 cusecs for Sahibi / N.G. Drain- where upon the relevant Sector Control Rooms starts functioning and keeps a vigil in their respective areas. Second Warning been issued when the discharge from HathniKund Barrage exceeds 3 lakh cusecs or Discharge at Manasi exceeds 70000 cusecs for Sahibi / N.G. Drain- People residing within the river embankments near to active course shall be warned and arrangement made to shift them[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 363 to safer places. The Police and the staff of the Flood Control Dept. would undertake patrolling along Right & Left marginal embankments and keep vigil on the vulnerable points. The third warning been issued when the discharge from HathniKund Barrage exceeds 5 lakhs cusecs while for Sahibi or Discharge at Manasi exceeds 1 lakh cusecs for Sahibi / N.G. Drain- This warning shall be issued when the discharge at Masani Barrage exceeds one Lakh cusecs. People residing in dangerously exposed areas will be advised to remain alert and move to places of higher altitude, in case of need. Vulnerable Points Levels at S. CRITICAL POINTS ACTION REQUIRED Old Railway No. Bridge 205.33 1. Rescue Boat Club R/B River Additional Filled Earth Bags were Yamuna placed to stop entry of water from (Provisional Riverside. Danger 2. Monastery Market R/B River Additional Filled Earth Bags were Level) Yamuna placed to stop entry of water from Riverside. 3. Geeta Ghat- Entry Point R/B River Additional Filled Earth Bags were Yamuna placed to stop entry of water from Riverside. 4. Qudsia Ghat R/B River Yamuna Hydra was deployed for operation of gates/inlets 5. Nigam Bodh Ghat R/B River Gaps were plugged by placement of Yamuna filled earth bags 6. Tonga Stand Regulator R/B River -DO- Yamuna 7. Vijay Ghat Regulator R/B River Additional Filled Earth Bags were Yamuna placed to stop entry of water from Riverside. 8. Nalla No. 12 & 12A R/B River Pumps were deployed for pumping Yamuna continuously and additional Filled Earth Bags were placed to stop entry of water from Riverside.364 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 9. Regulator at RD-180 m of R.M.E. -DO- 10. Chilla Regulator Gates closed as per requirement 11. Burari Regulator at RD-1135 m of - DO- Jahangirpuri Drain. 206.00 12. Neem Karoli-Gau Shaala R/B Additional Filled Earth Bags were River Yamuna placed to stop entry of water from Riverside. 13. Civil Military Drain Regulator R/B Were closed as per requirement River Yamuna 14. L. F. Bund in Trans Yamuna Area The hard stone and earth bags dumped to prevent erosion of Shanks Shank RD. 1400m & Embankment. Shank RD. 800m 15. Nalla No. 14 Regulator R/B River Pumps were deployed for pumping Yamuna continuously and additional Filled Earth Bags were placed to stop entry of water from Riverside. 16. Outfall of Toe Drain along RME Additional Filled Earth Bags were near RD 2700m of Supplementary placed to stop entry of water from Drain Riverside. 207.00 17. D.J.B site along Ring Road R/B Additional Filled Earth Bags were River Yamuna placed to stop entry of water from Riverside. 3. Actions Taken by I&FC Department  Monitoring of flood In order to monitor the flood situation, control rooms and wireless network are setup throughout the monsoon season and a complete record of the discharges and their water levels is maintained in respect of river Yamuna as well as river Shahibi with the active assistance of CWC, IMD & the neighbouring States. Daily weather report having data of rainfall till date, rainfall during last 24 hours and forecast of the rain as well as floods is generated and shared with all stakeholders to take necessary measures.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 365  Protection and Maintenance of embankments The department has constructed above embankments over different periods to fortify the city against the flood furry and to protect & maintain these embankments, different types of flood protection and maintenance works like protection of embankments, protection/ construction/restoration of spurs, launching aprons, stone pitching etc. are being undertaken by the department on regular basis as per the need. The staff of the Flood Control Dept. would undertake 24x7 patrolling along right & left marginal embankments and keep vigil on the vulnerable points.  Regulators The regulators constructed and maintained by I&FC department at 15 Nos. outfalls of different drains directly out falling into river Yamuna in the city reach will have to be operated from time to time to suitably pump out the city drainage in case the river is in high flood and heavy local rainfall. The regulators/ gate being closed at the time of heavy discharge in the river to check the reverse flow of river into the city side. A close liaison is to be maintained with U.P. Irrigation Department for timely opening of gates of Chilla regulator, if heavy discharge enters Delhi through Shahdara drainage system, either due to heavy local rainfall or rainfall in upstream Loni-Saharanpur U.P. areas. Boats and emergency portable pump sets will have to be kept ready to meet any exigency arising out of the flood situation.  Resources Boats and emergency portable pump sets will have to be kept ready to meet any exigency arising out of the flood situation. Resources are available with the I&FC department to meet out the requirement during monsoon season.  River training works They may be constructed on both sides of the river or only on one side, for some suitable river length, where the river is passing through towns or cities. (ii) Spurs or Groynes: These are constructed, in order to protect the bank from which they are extended, by deflecting the current away from the bank. (iii) Pitching of banks and provision of launching aprons: Banks of a river are directly protected by stone pitching, or by concrete blocks, or by brick lining or by growing vegetable cover, etc. Concrete blocks are very costly, and stone pitching is mostly adopted, if available without much difficulty. The banks of the river are366 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] made stable by giving them a stable slope varying from 1:1 to 2:1 depending upon the material of the bank. They are then pitched, so as to make them strong enough to resist erosion.  Flood Plain Zone In compliance to the directions of Hon’ble National Green Tribunal in the matter of Manoj Mishra Vs. Union of India (O.A. No. 06/2012) vide order dated 13.01.2015 vide which it has been directed that flood plain should be identified for flood, once in 25 years in the interest of ecology, biodiversity and the river flow. IIT Delhi has conveyed flood of 2011 as once in 25 years during which maximum discharge release from Tajewala and maximum gauge recorded at Old Railway Bridge was 205.72 in respect of discharge of 6,41,462 cusecs. The 20 sheets of flood plain maps have been prepared by GSDL based on the maximum water levels observed in year 2011 at various locations with the level of 205.72 round of to 206.00 and forwarded the same to Delhi Development Authority for physical demarcation of flood plain for river Yamuna. 4. KEY INFRASTRUCTURE OR SPECIAL PROJECTS IDENTIFIED DURING THE PLAN PERIOD, ALONG WITH DETAILS OF PROJECTS AND THEIR TIMELINES Table 3. List of Special Projects S. No. Project Name Target Timeline 1. Creation of Water The implementation of this project on a Bodies/ larger scale of about 1180 Acre, as Reservoirs in proposed in the conceptual plan, shall Flood Plains of result in recharge of flood plain of River River Yamuna by Yamuna from Palla to Hiranki and the retaining excess ground water can be tapped through the water in the River existing network of tube wells of DJB and during Monsoon this network can be further augmented by Season from DJB for improving the fresh water supply Palla to to Delhi. Wazirabad. 2. Details of Pilot Activity aimed at improving the quality of Project at Ghoga wastewater as well as to rejuvenate Drain drains. A pilot project to treat at least ten lakh litres per day of wastewater by using ecologically sensitive & sustainable[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 367 technology like constructed wet land system was created to treat wastewater flowing in Ghoga Drain. The Pilot Project comprises construction of SWAB based wetland system. The project has been envisaged to treat 1 MLD of wastewater flowing in Ghoga Drain and the Construction of 6 Nos. check dam of 0.50 M high with stone boulders within an interval of 1 Km each. 3. Pilot Project: In order to rejuvenate the water body a Awarded award of Rejuvenation of pilot project for rejuvenation of Rajokari Excellence Rajokari Water water body was undertaken by the awarded on Body department with objective of: 28.08.2020, under National (i) Treatment of sewerage water by Water Innovation ecological sustainable technology to Summit & Awards reduce pollutant as such BOD COD 2020. dissolved and suspended solid etc. and bring it to permissible level for water body. (ii) Landscaping of open area along with Horticulture work and provision for lighting of the area. Further installation of CCTV camera for security purpose, plantation of creeper plants over the boundary wall in order to increase aesthetic view and greenery, open gym equipment, children play equipment for the purpose of use of this area for complete recreation was also desired and the same is in process that will be completed by 30.04.2021. 4. Widening & Schemes were prepared for raising of strengthening of embankment and strengthening by Embankments widening of embankment from existing along river single lane to two-lane carriageway They Yamuna from were placed and approved by the Palla to Technical Advisory Committee (TAC) in its Wazirabad. 36th& 41st meetings. The Approximate expenditure on widening and strengthening of Embankment from Palla to Wazirabad shall be Rs. 3800 Lacs.368 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 5. Water front A scheme of Rs. 6.22 crores for the Floating of tender development Comprehensive Consultancy services for is in process along Najafgarh Water Front Development on Najafgarh drain Drain from Chhawla Bridge to Basaidarapur Bridge with designing of two lane road on left & right bank of Najafgarh drain & various bridges have been approved by GNCT of Delhi. 6. National The National Hydrology Project, (NHP) is The work Hydrology Project a World Bank supported Govt. of India proposed will be (NHP) scheme with 100% grant in aid to Central partly taken up in & State implementing agencies (IA). I&FC the current Department & DJB have signed the NHP Financial Year as an Implementing Agency (IA) for the and the remaining State of Delhi. work will be taken up in forthcoming NHP aims at taking up the following main years. On activities: completion of this a. Establishing and upgrading Hydro-met project, various network in all the river basins. b. Bringing data being the entire hydro-metrological data on a generated on real standardized central database for easy time will be storage, validation, analysis and available on the dissemination. c. Development of Decision server of NHP for Support Systems for Flood Forecasting, real time reservoir operations, water resources monitoring & can planning & management, conjunctive use be assessed by etc. following a river basin approach. d. the authorized Capacity building of the States and representative of enhancing collaboration between Centre & all other State States and amongst the State themselves Govt. through trainings, establishment of data centres, Centres of Excellence etc. Total allocation of Rs. 3679.76 Crores is made for this work, to be implemented by various Central and State Govt. Agencies. For this purpose, Rs. 25.00 Crores has been allocated for the State of Delhi. Following activity has been approved for implementation by I&FC Department and Delhi Jal Board under National Hydrology Project: - 1. Real Time information system on drainage network in Delhi. 2. Real Time[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 369 information system for rainfall in Delhi. 3. Groundwater Measurement Equipment. 4. Upgradation of Water Testing Laboratories. 7. Strengthening Already and raising of undertaken. right bank of Najafgarh drain 8. Rejuvenation of The water bodies in Delhi are in extremely After issue of 10 water bodies bad shape and are in varying degrees of Administrative entrusted to I&FC environmental degradation. Hence, the Approval and Dept. Govt. of Delhi taken up development and Expenditure rejuvenation of water bodies as a flagship Sanction, the programme. Though I&FC Dept. is not period of land-owning agency but has taken up completion for above 10 water bodies for rejuvenation as rejuvenation of per present Govt. policy. The rejuvenation above 10 water of above water bodies is being taken up in bodies will be 18 holistic manner by constructing the wet months including lands that are ecologically sensitive and all codal sustainable which are most suitable in situ formalities. treatments for discharges of wastewater less than 1 MLD. As a part of rejuvenation, necessary landscaping works, walking tracks, cycling tracks, benches, solar lighting, public amenities like toilets, Amphitheatre where ever feasible will be taken up to facilitate effective utilization for recreation purpose of local public. The estimated cost for rejuvenation of above 10 water bodies including STP and landscaping is Rs. 21.54 Cr. 5. ESTIMATED LAND REQUIREMENTS FOR PROJECTS The department is facing a problem of disposal of desilted earth, as MCDs are reluctant to take the same; hence, it is necessary that DDA may give land parcels at different locations along the drains having size of around 1 ha. each at every 10 Km interval (totalling around 1000ha.).370 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] It is recommended that the service lines in form of sewer, water, electric, communication etc. should be shifted outside the land boundary of I&FC drains. Large chunks of I&FC land are being utilized for the construction of dhalaos by civic agencies, it is suggested that separate land should earmarked outside drain boundary for collection, processing, shifting and disposal of MSW as well as C&D waste along entire align of existing drains. 6. PROJECTED LAND REQUIREMENT IN VIEW OF MPD 2041 The drain wise projected land requirement considering expected remodeling, their operation and maintenance, creation of green belt, for processing of the desilted earth, for service road, for service lines, for C&D waste and additional stores etc. is attached as Annexure-II (b). The additional land available for future use along drains varies with drains as well as their stretch/locations. In upper reaches of Najafgarh its width is more than 135 m. while in lower portion (which is highly urbanized) it comes down to 25 m. Similar situations exist in other drains also. This additional land is being utilised for service lines like sewer lines, water pipeline, H.T. lines, communications cables etc. in addition to construction of Dhalaos, Chhat Pooja Ghats, Mohalla clinics, Parks etc. To create green zones along drains plantation work has also been done on the available drain land at different locations. 7. KEY TARGETS THAT WILL BE INCLUDED IN MPD 41 ACTION PLAN Component Current status Target for 2041 Phasing Plan Length (in km) of The drain wise status of length of drain, width, depth of drain, buffers created and catchment area, design discharge, present status of embankments maintained along & status of buffer land along the drains is annexed as (Annexure-II major drains (b))[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 371 8. SUGGESTIONS AND RECOMMENDATIONS For construction of new drains in the sub cities to be planned under Master Plan 2041, following recommendations are made with regard to planning / construction of drainage system: a) The existing drainage network of Irrigation and Flood Control Department may be remodeled within the limits of the feasibility, to integrate the drainage network of sub-cities to be planned under Land Pooling Policy / MPD-2041, whenever, the relevant details are shared with I&FC Department in consultation with all stakeholders. b) Provision should be made for continuous green lines along the entire course of the drains on both sides. c) A separate provision for the services lines like sewer, water, electric, communication etc. should be made outside the drain boundary areas. d) A separate provision for land for collection, processing, transportation, shifting and disposal should be made for MSW as well as C&D waste. e) New development should be made in such a way that overall runoff from the area does not increase with the proposed urbanization. For that necessary measures in form of ponds, parks, porous pavements, green belts, artificial lakes / or other rainwater harvesting and storage structures etc. may be adopted. f) The officers involved in drainage and flood management should be given exposure to International best practices, so as to adopt the same to the National Capital City of Delhi. Referred annexures for I&FC Service Plan: Annexure II (a): Embankment Strengthening /Remodelling Status of Drains Annexure II (b): Details of Buffers along Drains of I&FC Department Annexure II (c): Detail of Effluent Irrigation System372 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ANNEXURE – II (a) : Embankment Strengthening /Remodelling Status of Drains Name of Drain Length of Present status of Whether any Whether Drain (in KMs) Embankment strengthening remodelling of proposed or drain is proposed/ required required CD-I Najafgarh Drain, CD-I- 45.31 Stable No NA 45316m Palam Drain 4.20 Stable No NA Palam Link Drain 1.47 Stable No NA Najaf Garh Pond Yes 1.95 Stable No Drain Work in progress. Nasirpur Link Drain 2.90 Stable No NA Bijwasan Drain 4.20 Stable No NA Pankha Road Drain 3.60 Stable No NA Shahbad 0.23 Stable No NA Mohammadpur Drain Mudhela Drain CD-I- 6.95 Stable No NA 6920m, CD-II Supplementary Drain Inspection path -N/A- -N/A- D 16436 m to RD i) L/B 17700 to Section Section already 22471 m 19362- CC Road already lined lined ii) R/B 16436 to 16700- CC Road iii) R/B 21350 to 22137-CC Road 6.04 Mohalla Clinic(RD 17700m R/B) 1500 plants proposed b/w RD 16436m to 22471m at scattered locations[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 373 Name of Drain Length of Present status of Whether any Whether Drain (in KMs) Embankment strengthening remodelling of proposed or drain is proposed/ required required 350 Sapling already planted and their maintenance is in progress 11.82 Najafgarh Drain, RD Inspection Road No proposal No proposal of 45316 m to RD i) L/B RD 47390m of remodelling as of 57140m to RD 48300m strengthening now CC/Bituminous as of now - Remodelling Road - work shall be ii) L/B RD 54346m strengthening done if so to Nose Point work shall be required in future. CC/Bituminous done if so Road necessitated iii) L/B RD 56306m in future to RD 57106m CC/Bituminous Road iv) R/B RD 46870m to RD 48315m CC Road v) R/B RD 54346m to RD 56704m Bituminous Road CD-III Trunk Drain No.I , CD- III-5260m, 5.26 Good NO NO RD 0m to RD 3200m374 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Name of Drain Length of Present status of Whether any Whether Drain (in KMs) Embankment strengthening remodelling of proposed or drain is proposed/ required required RD 3200m to 5260m Trunk Drain No. II RD-4550m to RD- 3900m RD-3900m to RD-3230m 4.55 Good NO NO RD-3230m to RD-1980m RD-1980m to RD-0m Shahdara Outfall Drain RD-5900m to RD- 5.90 Good NO NO 0m Ghazipur Drain RD-0m to RD- 2135m RD-2135m to RD- 3505m 6.15 Good NO NO RD-3505m to RD- 5090m RD-5090m to RD- 6157m Shahdara Link Drain RD 4545m to RD- 3500m= 45.15m RD 3500m to RD- 3065m= 53.50m 4.56 Good No NO RD 3065m to RD-2565m= 44.50m RD 2565m to RD- 2150m= 36.45m[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 375 Name of Drain Length of Present status of Whether any Whether Drain (in KMs) Embankment strengthening remodelling of proposed or drain is proposed/ required required RD 2150m to RD 1330m = 43.45m RD 1330m to RD- 930m = 43.45m RD 930m to RD- 330m = (covered portion) 43.00m RD 330m to RD 130m= 43.45m CD-IV Trunk Drain No.I , CD- 8.13 IV-5260m, to 13387m RD 5260m to 6690m 1.43 Good No No RD 6690m to 10330m 3.64 RD 10330m to 3.06 13387m Karawal Nagar Drain 2.48 Good No No Biharipur Drain 1.00 No sufficient land RD 0m to RD 650m 0.65 is available for No No RD 650m to RD 0.35 Embankment. 1000m Bund Drain 3.45 No sufficient land Yes Remodelling of is available for drain is in Embankment. progress on existing section as the no sufficient land is available along the drain. Escape Drain No. I 2.98 Good from RD 0m NA Drain is passing376 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Name of Drain Length of Present status of Whether any Whether Drain (in KMs) Embankment strengthening remodelling of proposed or drain is proposed/ required required RD 0m to 980m 0.98 to RD 2650m. through thickly RD 980m to 1650m 0.67 populated area. No sufficient land Due to land RD 1650m to 2650m 1.00 is available for constraint, no RD 2650m to 2980m 0.33 Embankment from any remodeling is RD 2650m to RD proposed 2980m. between RD 1650m to RD 2560m. However remodeling is required in near future. Escape Drain No. II 0.45 Good No No Relief Drain 2.18 Drain is passing RD 0m to 695m 0.70 through thickly populated area. RD 695m to 965m 0.27 Due to land RD 965m to 1860m 0.90 No sufficient land constraint, no RD 1860m to 2180m 0.32 is available for NA any remodeling is Embankment. proposed. However remodeling is required in near future. CD-V Ali Drain 2.78 1 side Road 1 side No No NTPC. Asola Drain 3.39 on Right side from There is 400 to 600 RD. kuchcha zigzag drain passes through[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 377 Name of Drain Length of Present status of Whether any Whether Drain (in KMs) Embankment strengthening remodelling of proposed or drain is proposed/ required required private land and water spreads in the open field and there is no outfall of drain. Molar Bund Extension 1.38 No No No Drain Sarita Vihar Drain 1.30 Earthen No No CD-VI Drain No. 6 14.73 Good condition Not required Not required Burari Creek 8.86 Good condition Not required Not required Burari Drain 6.04 Good condition Not required Not required New Drain 5.40 Good condition Not required Not required Jagatpur Link Drain 2.46 Good condition Not required Not required (Link Drain No. II) Toe Drain 4.00 Good condition Not required Not required CD-VII BAWANA ESCAPE 19.79 Strengthen No No DRAIN Bankner Link Drain 5.43 Good Yes No Khera Khurd Drain 5.20 Good Yes Yes Ghoga Link Drain 5.12 Good No No Naya Bas Link Drain 3.00 Good No Yes Sanoth Link Drain 3.35 Good No Yes Alipur Link Drain 0.88 Good No No Tikri Khurd Link Drain 1.94 Good Yes Yes Khera Kalan Drain 0.86 Good No No (Link)378 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Name of Drain Length of Present status of Whether any Whether Drain (in KMs) Embankment strengthening remodelling of proposed or drain is proposed/ required required Bawana Drain RD 1.830 Good No No 9561M to RD 11391M Nangloi Drain CD-VII- 2.10 Good No No 2100m CD-VIII MungeshPur Drain RD 15850 m to RD 21.65 Earthern - - 37550 m Bazitpur Drain RD 0 8.05 Earthern - - m to RD 8049 m Bawana Drain RD 0 10.83 Earthern - - m to RD 9561 m Ladpur Link Drain 2.30 Earthern - - RD 0 to RD 2300 m Katewara Link Drain 1.33 B/Work - - RD 0 m to RD 1330 m Jatkhor Link Drain 3.76 Earthern - - RD 0 m to RD 3760 m Nangal Thakran Link Drain RD 0 m to RD 0.90 Earthern - - 900 m Madanpur Drain RD Channelization of 4100 m to RD 8229 m drain near Ghewra village 4.13 Earthern - on up stream of Railway line crossing is required Kirari Suleman RD Remodelling of 4150 to RD 7850 m KSN drain is 3.70 Dry brick - required as the most of the[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 379 Name of Drain Length of Present status of Whether any Whether Drain (in KMs) Embankment strengthening remodelling of proposed or drain is proposed/ required required catchment area of this drain is urbanized and many unauthorized colonies were also developed and being developed. Due to this, there is no scope for percolation of storm water and which has to be carried by this drain. Besides this, due to lack of sewerage network in unauthorized colonies the discharge of sewage, household waste and other wastewater are also flowing into KSN drain through various drains of other Govt. Agencies. There is no land available for380 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Name of Drain Length of Present status of Whether any Whether Drain (in KMs) Embankment strengthening remodelling of proposed or drain is proposed/ required required remodeling since the adjacent area in both sides is developed and urbanized. Hence, there is a need, to acquire land for remodeling of KSN drain. Sultanpur Drain RD 0 Strengthening m to RD 9200 m of bank is required on upstream 9.20 Earthern side of - Karala- Kanjhawala road at Rupali Enclave Rasulpur Link Drain 0.75 Earthern - - RD 0 m to RD 750 m CD-IX Supplementary drain Inspection road, from RD 0to dhalao, twin RD 16436m pipeline of DJB, PWD Road, Strengthening Remodelling 16.44 Plantation and Required Required Mohalla Clinic etc. exist on Bank of Supplementary Drain. CD-X[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 381 Name of Drain Length of Present status of Whether any Whether Drain (in KMs) Embankment strengthening remodelling of proposed or drain is proposed/ required required Jahangir Puri Outfall drain RD 0m to RD 1700m Strengthening RD 1700m to RD and 3000m RD 0m to RD upgradation 4800m both side of regulator at RD 3000m to RD 5.47 bank PCC tile lined RD 1135m. 4000m & RD 4800m to (Work being No RD 4000m to RD RD 5470m both taken by 4800m side bank stone Mechanical pitching Division-II, in RD 4800m to RD year 2020- 5470m 21.) CD-XI Supplementary Drain, CD-XI RD 22471m to RD 2.604 Land/Road exist 25075m on left bank of RD 25075m to RD 0.985 Supplementary 26060m Drain where park, Mohalla Clinic, RD 26060m to RD 2.020 Chhat Ghat, 28080m Inspection Road RD 28080m to RD 3.220 and Dhalao have 31300m Strengthening Remodelling been constructed. RD 31300m to RD 3.200 required required Around 10000 nos. 34500m plants has been planted on left bank of Supplementary Drain. On the right bank Kaccha inspection Road382 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Name of Drain Length of Present status of Whether any Whether Drain (in KMs) Embankment strengthening remodelling of proposed or drain is proposed/ required required exists which is common bank of N G Drain and Supplementary Drain. CD-XII Madanpur Drain 4.10 - Not Required Not Required (RD 0m to RD 4100m) Kirari Suleman Nagar Drain 4.10 - (RD 0m to RD 4100m) (RD 0m to RD 1722m) 1.72 - Not Required Not Required (RD 1722m to RD 1.98 - 3700m) (RD 3700m to RD 0.40 - 4100m) Mundka Peripheral Drain 2.35 - Not Required Not Required (RD 0m to RD 2345m) Ranhola Pond Drain 1.16 - Not Required Not Required (RD 0m to RD 1160m CD-XIII MungeshPur Drain 10.362 Stable No No CD-XIII-10362m 0m to 1575m = 1575m to RD. 6600m RD.6600m to 10362M Bhupania Chudania 8.55 Stable No No Drain (including RD. 0m to Haryana portion) 2736m[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 383 Name of Drain Length of Present status of Whether any Whether Drain (in KMs) Embankment strengthening remodelling of proposed or drain is proposed/ required required RD. 6280m to 8550M RD.2736m to 6280M (Haryana State) Mudhela Drain CD- 5.60 Stable No No XIII- From 6950 to 12560m Nangli Sakrawati Link 0.93 Stable No No Drain, CD-XIII- RD- RD. 0m to 385 0m to 385m = 385m, RD. 1712m to CD-XIII-RD-1712m to RD.2262m 2262m = 550m ANNEXURE – II (b): Details of Buffers along Drains of I&FC Department DETAILS OF BUFFERS ALONG DRAINS OF I&FC DEPARTMENT Additional land required Name Leng Rea Reach Dept Balan Remodelli Operatio Creati For For For For For Other Total Remarks of th of ch wise h of ce ng / n & on of process Servi services C&D additio s, if (in Drain Drain wise top drai land augmenta maintena green ing of ce like; was nal any hecta (in total drain n (in width tion nce belt desilted road electric te stores re) KMs) land width mtr.) (in earth line, of widt (in mtr.) communic I&FC h (in mtr.) (Buffe ation Dept. mtr.) includi rs) cable, pipe / ng lines Righ water water/sewe t of way r & dhalao way FC-I Jahan gir Puri Outfall drain RD 0m 75.0 to RD 54.00 21.00 1700m 5.47 0 2.00 mtr RD 3.50 mtr 2 mtr each each 1700m 66.0 1.80 each side side 48.00 18.00 --- side --- --- --- --- --- 8.20 to RD 0 m Total = Total = 4.00 Total 3000m 7.00 mtr mtr = 4.00 RD mtr 31.0 3000m 27.00 4.00 0 to RD384 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] DETAILS OF BUFFERS ALONG DRAINS OF I&FC DEPARTMENT Additional land required Name Leng Rea Reach Dept Balan Remodelli Operatio Creati For For For For For Other Total Remarks of th of ch wise h of ce ng / n & on of process Servi services C&D additio s, if (in Drain Drain wise top drai land augmenta maintena green ing of ce like; was nal any hecta (in total drain n (in width tion nce belt desilted road electric te stores re) KMs) land width mtr.) (in earth line, of widt (in mtr.) communic I&FC h (in mtr.) (Buffe ation Dept. mtr.) includi rs) cable, pipe / ng lines Righ water water/sewe t of way r & dhalao way 4000m RD 4000m 35.0 33.00 3.00 to RD 0 4800m RD 4800m 54.0 43.00 12.00 to RD 0 5470m Trunk Drain No.I , CD-III- 5260m RD 0m 5.26 54.8 2.67 to RD 38.00 16.86 10.00 7.50 14.00 7.50 5.00 5.00 15.68 6 3200m RD 3200m 22.8 20.00 2.86 24.00 7.50 14.00 7.50 5.00 5.00 12.98 to 6 5260m RD 5260m 45.0 1.43 33.00 4.00 12.00 8.00 10.00 5.00 5.00 4.00 to 0 6690m RD 6690m 45.0 to 3.64 25.00 4.50 20.00 10.00 5.00 5.00 7.28 0 10330 m RD 10330 37.0 m to 3.06 15.00 4.50 22.00 10.00 5.00 5.00 6.11 0 13387 m Trunk Drain No. II 20.00 RD- 4550m 15.2 15.24 0.00 32.00 7.50 14.00 7.50 5.00 5.00 4.62 to RD- 4 3900m RD- 3900m 32.7 20.05 12.69 20.00 7.50 14.00 7.50 5.00 5.00 3.95 Drains to RD- 4.55 4 2.60 3230m under the jurisdiction RD- are 3230m 45.2 20.55 24.69 8.00 7.50 14.00 7.50 5.00 5.00 5.88 passing to RD- 4 through 1980m the RD- densely 1980m 54.8 populated to RD- 6 22.80 32.06 7.50 14.00 7.50 5.00 5.00 7.72 area, 0m acquisition of the Shahd proposed ara additional Outfall land is Drain only 5.90 3.26 RD- possible if 5900m 135. the to RD- 00 58.764 76.236 10.00 14.00 5.00 5.00 20.06 redevelop 0m ment of the nearby Ghazip area of the ur Drain 6.15 3.11 drain proposed RD-0m 104. 54.44 49.56 5.00 7.50 14.00 5.00 5.00 7.79 by DDA[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 385 DETAILS OF BUFFERS ALONG DRAINS OF I&FC DEPARTMENT Additional land required Name Leng Rea Reach Dept Balan Remodelli Operatio Creati For For For For For Other Total Remarks of th of ch wise h of ce ng / n & on of process Servi services C&D additio s, if (in Drain Drain wise top drai land augmenta maintena green ing of ce like; was nal any hecta (in total drain n (in width tion nce belt desilted road electric te stores re) KMs) land width mtr.) (in earth line, of widt (in mtr.) communic I&FC h (in mtr.) (Buffe ation Dept. mtr.) includi rs) cable, pipe / ng lines Righ water water/sewe t of way r & dhalao way to RD- 00 2135m RD- 2135m 104. 53.83 50.17 7.50 5.00 5.00 2.40 to RD- 00 3505m RD- 3505m 104. 52.59 51.41 7.50 5.00 5.00 2.77 to RD- 00 5090m RD- 5090m 85.0 47.73 37.27 5.00 7.50 7.00 3.50 5.00 5.00 3.52 to RD- 0 6157m Shahd ara Link Drain RD 4545m 45.1 22.25 22.90 10.00 7.50 10.00 5.00 5.00 3.92 to RD- 5 3500m RD 3500m 53.5 22.25 31.25 10.00 7.50 10.00 5.00 5.00 1.63 toRD- 0 3065m RD 3065m 44.5 22.25 22.25 7.50 5.00 5.00 5.00 1.13 to RD- 0 2565m RD 2565m 36.4 22.25 14.20 7.50 5.00 5.00 5.00 0.93 to RD- 5 2150m 2.13 4.56 5 RD 2150m 43.4 22.25 21.20 7.50 5.00 5.00 5.00 1.85 to RD 5 1330m RD 1330m 43.4 22.25 21.20 7.50 5.00 5.00 5.00 0.90 to RD- 5 930m RD 930m to RD- 330m 43.0 15.45 27.55 7.50 5.00 5.00 5.00 1.35 (Cover 0 ed Portion ) RD 330m 43.4 22.25 21.20 7.50 5.00 5.00 5.00 0.45 to RD 5 130m Karaw al 38.9 2.48 14.00 4.00 24.96 5.00 5.00 5.00 3.72 Nagar 6 Drain Bihari pur 1.00 4.00 Drain RD 0m to RD 0.65 4.50 2.00 1.50 2.50 5.00 6.00 5.00 6.00 6.00 3.00 3.00 2.14 650m RD 650m 0.35 8.00 2.00 1.50 6.00 5.00 4.00 5.00 5.00 4.00 3.00 3.00 1.02 to RD386 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] DETAILS OF BUFFERS ALONG DRAINS OF I&FC DEPARTMENT Additional land required Name Leng Rea Reach Dept Balan Remodelli Operatio Creati For For For For For Other Total Remarks of th of ch wise h of ce ng / n & on of process Servi services C&D additio s, if (in Drain Drain wise top drai land augmenta maintena green ing of ce like; was nal any hecta (in total drain n (in width tion nce belt desilted road electric te stores re) KMs) land width mtr.) (in earth line, of widt (in mtr.) communic I&FC h (in mtr.) (Buffe ation Dept. mtr.) includi rs) cable, pipe / ng lines Righ water water/sewe t of way r & dhalao way 1000m Bund 3.45 7.50 3.70 2.00 3.80 5.00 4.00 5.00 3.00 6.00 3.00 3.00 10.00 Drain Escap e Drain 2.98 No. I RD 0m 25.9 to 0.98 8.00 4.00 3.00 3.00 0.60 0 980m RD 980m 23.0 0.67 6.00 3.00 17.90 4.00 5.00 5.00 6.00 3.00 3.00 1.74 to 0 1650m RD 1650m 18.2 1.00 6.00 2.50 17.00 5.00 4.00 5.00 5.00 6.00 3.00 3.00 3.10 to 3 2650m RD 2650m 17.0 0.33 2.80 2.00 12.23 5.00 4.00 5.00 5.00 6.00 3.00 3.00 1.02 to 0 2980m Escap 30.0 e Drain 0.45 10.00 3.00 20.00 5.00 3.00 3.00 0.50 0 No. II Relief 2.18 Drain RD 0m 27.0 to 0.70 13.00 2.00 14.00 3.00 3.00 6.00 3.00 3.00 1.26 0 695m Not RD visibl 695m e 0.27 5.00 3.00 5.00 3.00 6.00 3.00 3.00 0.76 to mars 965m h land RD 965m 0.90 8.00 2.60 1.20 5.40 5.00 3.00 5.00 3.00 6.00 3.00 3.00 2.52 to 1860m RD 1860m 15.0 0.32 5.00 1.50 10.00 3.00 5.00 3.00 6.00 3.00 3.00 0.74 to 0 2180m 154.2 FC-I 4 FC-II 1. RD 1. RD For RD 1. RD RD 0 m 0 m RD 0 to Services 2600m 0m to 10000 m to to (26.95x0.5)x1 13025m = 13025x2 = 2650 to RD --- 1725 1725 725 ---- 13025 m x 5m ---- = 26050 20m x ---- m = 11000 m - m = m = = 23244 Sqm. X 2= 130250 Sqm 15m = 45.00 40000 26.95 18.05 Sqm. 300 Mtr Vari Sqm Mtr. Mtr. For Sqm. es Dhalao from Drain 14.7 RD 37.27 3.40 No.6 3 2. RD 2. RD Mtr 2. RD 2600m RD 5 2650 1725 4.10 1725 RD 2315 7700m m to m to Mtr m to (26.6x0.5)x(2 RD 2975 = 6600 2250 2250 250-1725) ---- ---- ---- ---- RD 20m x m = m = m = = 6983 Sqm 12000 15m = 44.00 26.60 18.40 RD 300 Mtr Mtr. Mtr. 11700 Sqm. 5 x 15m x 15m =[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 387 1025 Sqm. 3. RD 3. RD 3. RD 6600 2250 2250 m to m to m to (22.05x0.5)x( --- 1250 2650 2650 2650-2250) ---- ---- ---- ---- ---- ---- - 0m = m = m = = 4410 Sqm 40.00 22.05 27.95 Mtr Mtr. Mtr. 4. RD 4. RD 4. RD 1250 2650 2650 0m m to m to (26.6x0.5)x(2 to --- 2825 2825 825-2650) ---- ---- ---- ---- ---- ---- 1472 - m = m = = 2328 Sqm 5m = 26.60 17.40 28.00 Mtr. Mtr. Mtr. 5. RD 5. RD 2825 2825 m to m to (28.7x0.5)x(6 --- 6600 6600 600-2825) ---- ---- ---- ---- ---- ---- - m = m = = 54171 Sqm 28.70 15.30 Mtr. Mtr. 6. RD 6. RD 6600 6600 m to m to (26.45x0.5)x( --- 7730 7730 7730-6600) ---- ---- ---- ---- ---- ---- ---- - m = m = = 14944 Sqm 26.45 13.55 Mtr. Mtr. 7. RD 7. RD 7730 7730 m to m to (26.1x0.5)x(9 --- 9700 9700 700-7730)= ---- ---- ---- ---- ---- ---- ---- - m = m = 25709 Sqm 26.10 13.90 Mtr. Mtr. 7. RD 7. RD 9700 9700 m to m to (23.5x0.5)x(1 --- 1070 1070 0700-9700) ---- ---- ---- ---- ---- ---- ---- - 0m = 0m = = 11750 Sqm 23.50 16.50 Mtr. Mtr. 8. RD 8. RD 1070 1070 0m to 0m to (19.2x0.5)x(1 --- 1250 1250 2500-10700) ---- ---- ---- ---- ---- ---- ---- - 0m = 0m = = 17280 Sqm 19.20 20.80 Mtr. Mtr. 9. RD 9. RD 1250 1250 0m to 0m to (12.5x0.5)x(1 --- 1472 1472 4725-12500) ---- ---- ---- ---- ---- ---- ---- - 5m = 5m = = 13906 12.50 15.50 Mtr. Mtr. For Services From RD 0 m to RD 8867 m x 2.0 m = 17734 Sqm 500 Sqm For From RD 0 (Near From RD 0 m Dhalao (12x0.5)x(886 m to RD RD Burari 10 to 10 to to RD 8867 m Near RD --- 8.86 20.00 2.10 7) ---- ---- 8867 m x 2300 M ---- 18.90 Creek 12 8 x 5.0 m x 2 = 450 M - = 53202 Sqm 3.0 m = Near 88670 Sqm Near RD 26601 Sqm RD 1050M 6000 Near RD M) 1450 M Near RD 1950 M Near RD 4150 M Near RD 5250 M Near RD 5850 M388 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Near RD 6500 M Near RD 7850 M Near RD 450 M New Course 10x15x1 5 =2250 Sqm For services 5488x2 = 10976 Sqm From RD 0 For m to RD From RD 0 m 3.50 3.50 Dhalao (5x0.5)x(6040 5488 m to RD 5488 m Burari to to Near RD --- 10.88 6.04 0.60 Nil ) ---- ---- ---- ---- Drain 6.00 6.00 3500 M - 46 = 15100 Sqm 5488 x 5.00 5488 x 5.00x2 M M Near RD = =54880Sqm 5100 M 27440 Sqm 2 x 15.00x 15.00 = 450.00 Sqm For services From RD 0 to from RD (48x0.5)x(540 5400 m 0 to New 0) 5.40 61.00 48.00 5.20 13.00 ....... ---- 5400 m ....... ..... 19.44 Drain = 129600 5400x5x2 = .. Sqm 54000 Sqm 5400*2 = 10800 Sqm For services 2460x2 Jagatp = 4920 From RD 0 ur Link From RD 0 to SqmFor (2.5x0.5)x(24 m to RD Drain 2460 DhalaoN --- 2.46 4.00 2.50 2.50 1.50 60)= 3075 500 m500 x ---- ---- ---- ---- 3.532 (Link m2460x5x2 = ear RD - Sqm 5.00 = 2500 Drain 24600 Sqm 300 M1 Sqm No. II) x 15.00x 15.00 = 225.00 Sqm For services 4000x2 = 8000 Sqm For Dhalao From RD 0 Near RD From RD 0 m m to RD 3240 M to RD 4000 (1.5x0.5)x(40 4000 m Near RD Toe m --- 4.00 1.50 1.50 1.20 Nil 00) ---- ---- 2500 M ---- ---- 7.19 Drain - = 3000 Sqm 4000 x 5.00 Near RD 4000x5x2 = = 1900 M 40000 Sqm 20000 Sqm Near RD 850 M 4 x 15.00x 15.00 = 900.00 Sqm Total Area CD- 97.22 VI Remodelling For service i) RC augmentation Length RD 0 lane 19100 M for for future M to RD Length RD & 19200 store requirement 19790 M = 0 M to RD M at RD BAWA Length along 19790M At RD 19790 M = (Budhpu 9900 M NA 40.50 19.42 1.50 drain RD 0 M Width 5 M 11000 M 19790M r) 19.7 21.04 area ESCA M 5 M to to RD 19790 - both side of area 5 Width 4.25 ii) RD - - 78.28 9 75 15M x PE (Avg) (Avg.) 4.80 M = 19790M drain Acre M both side 4165 M 15 M = DRAIN Width area 2 x or 2 Ha. of drain to RD 225 extended 19790 x 5 = 1, area 2 x 4795 M Sqm 10 M 97,900 Sqm 19790 x (Near 0.02 Ha area 19790 x or 19.79 Ha. 4.25 = 1, R/B) J.J. 10 = 1, 97,900 68,215 Amar[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 389 Sqm Sqm Colony or 19.79 Ha. or 16.82 Bawana Ha. – Narela Road. (iii) RD 13400 M (R/B) Metro Vihar Holambi Kalan. area 3x 15M x 15 M = 675 Sqm 0.0675 Ha RD 2950 For service M (Near Remodelling laneLength Saboli augmentation RD 0 M to Road X- for future Length RD 0 RD 5430 M ing requirement M to RD 5430 = culvert). Length along M = 5430MWidt RD 3906 Bankn drain RD 0 M 5430MWidth 14.10 h 4.25 M M (Pio 14.43 er Link 5.43 11.25 1.00 2.85 to RD 5430 M - 5 M both side - - - - Avg. both side of Manihari 5 Drain = of drain area drain area Road X- 5430MWidth 2 x 5430 x 5 = 2 x 5430 x ing).area extended 8 M 54300 Sqm or 4.25 = 2x 15M area 5430 x 8 5.43 Ha. 46,155 x 15 M = = 43,440 Sqm Sqm or 450 or 4.34 Ha. 4.62 Ha. Sqm0.04 5 Ha Remodelling For service augmentation lane RD 740 for future Length RD 0 Length RD M (Near requirement M to RD 5200 0 M to RD Bhatte Length along M = 5430M 5200 M = wala drain RD 0 M Width 5 M 5200M Khera Road) to RD 5200 M both side of Width 4.25 12.24 Khurd 5.20 6.75 3.40 0.80 3.35 - - area - - - = 5200M drain M both side 3 Drain 15M x Width area 2 x 5200 of drain 15 M = extended x 5 = 52000 area 2 x 225 Sqm 5 M Sqm 5200 x 4.25 0.0225 area 5200 x 5 or 5.20 Ha. = 44,200 Ha = 26,000 Sqm Sqm or 2.60 Ha. or 4.42 Ha. Remodelling For service augmentation lane for future Length RD 0 Length RD requirement M to RD 5120 0 M to RD Length along M = 5120M 5120 M = drain RD 0 M Width 5 M 5120M Ghoga to RD 5120 M both side of Width 4.25 Link 5.12 5.00 5.00 0.80 0.00 - - - - - - 12.03 = 5120M drain M both side Drain Width area 2 x 5120 of drain extended x 5 = 51200 area 2 x 5 M Sqm 5120 x 4.25 area 5120 x 5 or 5.12 Ha. = 43520 = 25600 Sqm Sqm or 2.56 Ha. or 4.35 Ha. RD 490 Remodelling For service M augmentation laneLength CULVE for future Length RD 0 RD 0 M to RT (Nar requirement M to RD 3000 RD 3000 M Opposite Length along M = = Naya Metro 0.45 drain RD 0 M 3000MWidth 3000MWidt Bas 8.50 vihar 3.00 7.00 to 1.50 to RD 3000 M - 5 M both side - h 4.25 M - - - 7.073 Link Avg Holambi 0.50 = of drain area both side of Drain Khurd)ar 3000MWidth 2 x 3000 x 5 = drain area ea 15M extended 5 M 30000 Sqm or 2 x 3000 x x 15 M = area 3000 x 5 3.00 Ha. 4.25 = 225 = 15000 Sqm 25500 Sqm Sqm0.02 or 1.50 Ha. or 2.55 Ha. 25 Ha Remodelling For service augmentation Length RD 0 lane for future M to RD 3350 Length RD requirement M = 3350M 0 M to RD Length along Width 5 M 3350 M = Sanoth drain RD 0 M both side of 3350M Link 3.35 10.80 9.00 1.40 1.80 - - - - - - 7.88 to RD 3350 M drain Width 4.25 Drain = 3350M area 2 x 3350 M both side Width x 5 = 33500 of drain extended Sqm area 2 x 5 M or 3.35 Ha. 3350 x 4.25 area 3350 x 5 = 28475390 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] = 16750 Sqm Sqm or 1.68 Ha. or 2.85 Ha. RD 0 M, (Near Remodelling For service Kiran augmentation lane Garden) for future Length RD ii) RD Length RD 0 requirement 0 M to RD 435 M M to RD 880 Length along 880 M = (Near M = 880M drain RD 0 M 880M Alipur Alipur Width 5 M to RD 880 M Width 4.25 City Link 0.88 30.00 3.50 2.50 26.50 - both side of - - 2.115 = 880M M both side Forest Drain drain Width of drain Road) area 2 x 880x extended area 2 x 5 = 8800 Sqm 5 M 880 x 4.25 area 2x or 0.88 Ha. area 880 x 5 = = 7480 15M x 4400 Sqm Sqm 15 M = or 0.44 Ha. or 0.75 Ha. 450 Sqm 0.045 Ha Remodelling For service augmentation laneLength for future Length RD 0 RD 0 M to The requirement M to RD 1940 RD 1940 M drain Length along M = = Tikri existi drain RD 0 M 1940MWidth 1940MWidt Khurd 1.94 ng in 3.50 0.80 - to RD1940 M - 5 M both side - h 4.25 M - - - - 4.56 Link the = of drain area both side of Drain NH-1 1940MWidth 2 x 1940x 5 = drain area Land extended 5 M 19400 Sqm or 2 x 1940 x area 1940 x 5 1.94 Ha. 4.25 = = 9700 Sqm 16490 Sqm or 0.97 Ha. or 1.65 Ha. Remodelling For service augmentation lane for future Length RD Length RD 0 requirement 0 M to RD M to RD 860 Length along 860 M = M = 860M Khera drain RD 0 M 860M Width 5 M Kalan to RD860 M = Width 4.25 0.86 7.54 3.00 2.00 4.54 - both side of - - - - - 2.02 Drain 860M M both side drain (Link) Width of drain area 2 x 860x extended area 2 x 5 = 8600Sqm 5 M 860 x 4.25 or 0.86 Ha. area 860 x 5 = = 7310 4300 Sqm Sqm or 0.43 Ha. or 0.73 Ha. Bawan a Drain RD 2.80 1.83 2.45 2.45 2.45 9561M M - - - - - - - - - - 0 M M M to RD Avg 11391 M Remodelling For service augmentation lane for future Length RD 0 Length RD requirement M to RD 2100 0 M to RD Length along M = 2100M 2100 M = Nanglo drain RD 0 M Width 5 M 2100M i Drain to RD2100 M both side of Width 4.25 CD- 2.10 17.50 9.16 2.00 8.34 - - - - - - 4.94 = 2100M drain M both side VII- Width area 2 x of drain 2100m extended 2100x 5 = area 2 x 5 M 21000Sqm 2100 x 4.25 area 2100 x 5 or 2.10 Ha. = 17850 = 10500 Sqm Sqm or 1.05 Ha. or 1.79 Ha. Total Area CD- 145.5 VII 8 Munge sh Pur RD For Drain 21785 m dhalaos( 32.69 8.54 1 m 24.15 (12.70 x 0.50 RD (2 x 5 x to RD 5 x 15 x 21.6 m to m to to m to x 15850 - 21650/10000) 21285 - 15 - - - 40.50 5 10.00 18.76 1.50 1.46 21650/10000) m to =21.65 Ha m(500 x /10000) m m m m =13.74 Ha RD 100/1000 =0.11 37550 0)=5 Ha Ha. m Bazitp For ur dhalaos Drain 8.60 (4.09 x 0.50 x (2 x 5 x 4.47 1.00 5.83 (3 x 15 x RD 0 8.05 m to 8050/10000) - 8050/10000) - - - - - 9.75 m m m 15 m to 12.00 =1.64 Ha =8.05 Ha /10000) RD =0.06 8049[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 391 m Ha. Bawan For a Drain dhalaos 5.30 0.55 (1.50 x RD 0 (4.47 x 0.50 x (2 x 5 x (4 x 15 x 10.8 m to 4.75 0.75 m to 10830/1000 m to 10830/10000) 10830/10000) - - 15 - - - 14.96 3 12.00 m m 7.25 0) RD =2.42 Ha =10.83 Ha /10000) m m =1.62 Ha 9561 =0.09 m Ha. Ladpur Link Drain (1.67 x 0.50 x (2 x 5 x 11.00 2.92 0.30 8.08 RD 0 2.30 2300/10000) - 2300/10000) - - - - - - 2.49 m m m m to RD =0.19 Ha =2.30 Ha 2300 m Katew ara Link Drain (0.60 x 0.50 x (2 x 5 x 2.50 0.60 0.80 1.90 RD 0 1.33 1330/10000) - 1330/10000) - - - - - - 1.37 m m m m m to =0.04 Ha =1.33 Ha RD 1330 m Jatkhor Link Drain 2.75 1.834 0.163 (1.50 x (1.45 x 0.50 x (2 x 5 x RD 0 m to m to 0.30 m to 3760/10000 3.76 3760/10000) 3760/10000) - - - - - - 4.59 m to 3.50 2.587 m 1.66 ) =0.27 Ha =3.76 Ha RD m m m =0.56 Ha 3760 m Nangal Thakra n Link (1.67 x 0.50 x (1.50 x (2 x 5 x Drain 3.64 2.14 1.50 0.90 Dry 900/10000) 900/10000) 900/10000) - - - - - - 1.11 RD 0 m m m =0.07 Ha =0.135 Ha =0.90 Ha m to RD 900 m Madan pur For Drain dhalaos RD (4.85 x 0.50 x (2 x 5 x (3 x 15 x 12.50 9.02 1.00 3.48 4100 4.13 4130/10000) - 4130/10000) - - 15 - - - 5.19 m m m m m to =1.00 Ha =4.13 Ha /10000) RD =0.06 8229 Ha. m For dhalaos (5 x 15 x 15 /10000) Kirari =0.11 Sulem Ha. 0.52 an RD 7.50 (3.66 x 1.0 x (2 x 5 x For all 6.98 2.02 m to 4150 3.70 m to 3700/10000) - 3700/10000) - - services - - - 5.71 m m 8.02 to RD 15 m =1.35 Ha =3.70 Ha (1.50 x m 7850 3700/10 m 000) =0.55 Ha. Total =0.66 Ha Sultan For pur dhalaos Drain 4.20 (1.50 x (2.945 x 0.50 (2 x 5 x (3 x 15 x RD 0 m to 4.57 0.75 8.03 9200/10000 9.20 x 9200/10000) 9200/10000) - - 15 - - - 11.99 m to 12.60 m m m ) =1.35 Ha =9.20 Ha /10000) RD m =1.38 Ha =0.06 9200 Ha. m Rasulp ur Link Drain (0.91 x 0.50 x (2 x 5 x 6.80 3.214 0.30 3.61 RD 0 0.75 750/10000) - 750/10000) - - - - - - 0.78 m m m m m to =0.03 Ha =0.75 Ha RD 750 m Total Area CD- 98.44 VIII Madan 4.10 14.50 11.50 1.00 3.00 (4100 x (2300 x (4100 x 2.00 x RD (4100 + For - (2 x 15 - 14.31392 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] pur (Av.) 3.00)/10000 = 5.00)/10000 5.00)/10000= 900m)(50 2300) x dhalaos x Drain( 1.23 Ha =1.15 Ha 4.10 Ha 0 x 4.25/10000 (3 x 15 x 15)/100 RD 0m 100/1000 =2.72 Ha 15 00= to RD 0)=5 Ha /10000) 0.045 4100m =0.06 Ha(RD ) Ha. 3700 and RD `900) Kirari Sulem an Nagar Drain 4.10 (RD 0m to RD (A) 4100m 9.00 (A) ) m to 6.00 (2 x 15 For x 15) (RD 15.00 11.00 m to RD (4100+ dhalaos /10000 0m to m m (B) 13.00 (2400 x 5.00) (1150 x (4100 + 2400) 2900m) 2700) x (3 x 15 x = 0.045 RD 1.72 to 5.30 1.40 m /10000 5.00) x 5.00 (500 x 4.25 15 - Ha - 13.05 1722m 24.00 m (B) = 1.20 Ha /10000 /10000 100/1000 /10000 /10000) (RD ) m Rcc 9.70 =0.60 Ha =3.25 Ha 0) =2.89 Ha =0.06 1400 Troug m to =5 Ha (RD h 19.70 Ha. and RD 1722m Secti m 1722 ) to RD 1.98 on 1.80 3700m ) (RD 3700m to RD 0.40 1.40 4100m ) Mundk a (1 x 15 Periph x 15) eral (2350 x (2350 x 2.00 x (2350+ x /10000 Drain 5.00) 5.00) 4.25 x 2.00 2.35 2.50 2.00 1.50 0.50 - - - - = 0.023 - 5.55 (RD /10000 /10000 /10000 Ha 0m to =1.175 Ha =2.35 Ha =2.00 Ha (RD RD 850) 2345m ) Ranhol a Pond Drain (RD 1.16 1.20 1.20 1.20 - - - - - - - - - - - 0m to RD 1160m Total Area CD- 32.90 XII 374.1 Total Area FC-II 3 FC-III Supple mentary Drain RD 3.6 16436 6.04 55.00 50.00 5 -- 9.00 12.00 3 6.00 6 - - - 36.00 6 m to RD 22471 m Najafgar h Drain, RD 5.5 25.0 11.82 70.00 45.00 -- 18 24 3 12 12 - - - 69.00 45316 0 0 m to RD 57140m RD Supple RD 0m mentary 0m to to drain RD88 3.6 RD from 1 6.44 61.40 - - - - - 9 Ha. - - - 9 00m 6 8800 RD 0 to =152. m = RD 40 91.0 16436m 0m[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 393 RD RD 8800 8800 m to m to RD RD 9400 - - - - - - - - 9400 m m = = 51.6 113.0 0m 0m RD RD 9400 9400 m to m to RD RD - - - - - - - - 1643 1643 6m = 6m = 123.1 61.7 0m 0m Supple mentary Drain, CD-XI RD 22471m 22.0 2.604 68.30 46.27 - 4 5 - 3 3 - - - 15 to RD 3 25075m RD 25075m 103.0 54.2 0.985 48.72 - - - - - 1 1 to RD 0 8 26060m RD 26060m 125.0 3.6 76.2 2.020 48.72 - - - - - - - - - - to RD 0 6 8 28080m RD 28080m 35.9 3.220 84.67 48.72 4.5 3 - 3 3 13.5 to RD 5 31300m RD 31300m 118.0 69.2 3.200 48.72 - - - - - - - - - - to RD 0 8 34500m 143.5 Total 0 Ha. Total Area 143.5 FC-III 0 FC-IV RD. RD. – – – – – – – – – – – 0m to 0m to – – 12000x30x 12000x12x 12000x25x {4500 12000x15x 12000x10 3000/2 2000 – 1790 6000m 2= 720000 2= 288000 2= 600000 0} 2 = 360000 x2 = 100 Sqm 5m- - 135. Sqm Sqm Sqm Sqm Sqm 240000 Sqm – 200m 126.68 82 Sqm 2000 – to m 4.9 5905x55=3 5905x12x2 5905x25x2 5905X15x2 1475/1 Sqm 325m RD. 0 24775 Sqm =141720 = 295250 = 177150 5905x10x 033 2000 – RD. 6000m 12275x30x Sqm Sqm Sqm 2 Sqm Sqm 1790 to 95.0 2=736500 12275x12x 12275x25x 12275X15x =118100 3068/2 5m to 12000 0 Sqm 2=294600 2=613750 2= 368250 Sqm 148 2000 2018 m- Sqm Sqm Sqm 12275x10 Sqm Sqm 0m- Jheel 15136x30x x2 = Total 150m Portion 117. 2= 908160 15136x12x 15136x25x 15136X15x 245500 3782/2 8000 to RD. 00 Sqm 2= 363264 2= 756800 2= 454080 Sqm 648 Sqm 200m 12000 Total S q m Sqm Sqm Sqm RD. m to 2689435 Total Total 15136x10 19254 2018 17905 Sqm 1087584 Total 1359480 x2 = Sqm Najafgar 0m to m- Sqm 2265800 Sqm 302720 h Drain, 2243 110.00 Sqm Sqm 838.0 45.31 CD-I- 5m- m 7 45316m 250m RD. Total to 17905 906320 300m m to Sqm RD. 30180 2243 m - 5m to 120.00 2818 m 0m - RD. 200m 30180 to m to 250m 45316 RD. m - 2818 98.00 0m to m 3018 0m - 250m to394 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 300m RD. 3018 0m to 3188 0m - 180m to 250m RD. 3188 0m to 3435 0m - 150m to 175m RD. 3435 0m to 3718 0m - 150m to 200m RD. 3718 0m to 3896 0m - 200m to 225m RD. 3896 0m to 4068 0m - 180m to 200m RD. 4068 0m to 4293 0m - 180m to 220m RD. 4293 0m to 4480 0m - 250m to 300m RD. 4480 0m to 4531 6m - 200m to 250m 4200x25x2 4200x12x2 4200x15x2 4200x5x2 Palam 18 to 2.5 22.8 = 210000 5000 1050/7 2000 4.20 37.00 – = 100800 = 126000 = 42000 – 48.75 Drain 10.34 0 3 Sqm Sqm 35 Sqm Sqm Sqm Sqm Sqm Both side 1470x12x2 Palam 10.00 1470x10x2 1470x7.50 1470x5x2 4.50 to 1.3 = 35288 1470x5x2 = 2000 368/25 2000 Link 1.47 (Appr 6.62 = 29400 x2=22050 = 14700 – 12.08 2.25 0 Sqm 14700 Sqm Sqm 7 Sqm Drain ox.) Sqm Sqm Sqm Both side Najaf 17.00 1950x10x2 1950x12x2 1950x7.50 1950x5x2 Garh 0.9 12.5 1950x5x2 = 2000 488/34 1.95 (Appr 4.50 = 39000 = 46800 x2=29250 =19500 – – 15.69 Pond 5 0 19500 Sqm Sqm 0 ox.) Sqm Sqm Sqm Sqm Drain 2900x12x2 Nasirpur 12.00 2900x10x2 2900x7.50 2900x5x2 2.1 =69600 2900x5x2= 3000 725/50 2000 Link 2.90 (Appr 6.50 5.50 = 58000 x2= 43500 =29000 – 23.53 0 Sqm 29000 Sqm Sqm 8 Sqm Drain ox.) Sqm Sqm Sqm Both side 4200x12x2 20.00 4200x10x2 4200x7.50 4200x5x2 Bijwasa 0.9 21.0 =100800 4200x5x2= 5000 1050/7 2000 4.20 to 4.00 = 84000 x2=63000 =42000 – 34.06 n Drain 1 0 Sqm 42000 Sqm Sqm 35 Sqm 30.00 Sqm Sqm Sqm Both side Pankha 3.60 19.60 8.00 2.3 13.8 3600x10x2 3600x12x2 3600x25x2 4000 3600x7.5x 3600x5x2 900/63 2000 – 43.59[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 395 Road to 0 0 = 72000 = 86400 = 180000 Sqm 2= 54000 = 36000 0 Sqm Drain 24.00 Sqm Sqm Sqm Sqm Sqm Both side Shahba d 225x12x2= 225x7.50x 225x5x2= 1.2 12.1 225x5x2=2 1000 2000 Moham 0.23 14.50 2.35 – 5400 Sqm 2=3375 2250 57/40 – 1.64 2 5 250 Sqm Sqm Sqm madpur Both side Sqm Sqm Drain Mudhela 6950x7.50 6950x10x2 6950x5x2 Drain 1.5 11.5 6950x5x2 = 2000 x2 = 1740/1 6.95 16.50 5.00 = 139000 – = 69500 – – 38.72 CD-I- 2 0 69500 Sqm Sqm 104250 200 Sqm Sqm 6920m, Sqm 1056. TOTAL CD-I 13 Ali Drain 2.78 40.45 35.00 4.0 5.00 2780X12X2 2780X10X2 2000 2780X5X 500 500 0 = 66720 = 55600 Sqm. 2=2780 sqm & Sqm. ( Sqm. (6.67 Sqm. (5.56 (0.2 Sqm. 300 0.05 15.34 Hectare) Hectare) Hecta (2.78 Sqm. ( Hectare 5 re) Hectare) 0.085 ) Hectare -- -- ) -- Asola 3.39 2000 5470X7= 5470X5X 500 2000 Drain Av. 5470X12X2 5470X10X2 Sqm. 38290 2=54700 sqm & Sqm. 5470X4= 5.00 De = 131280 = 109400 (0.2 Sqm. (3.8. Sqm.(5.4 300 (0.2 2 to 21880 52.42 Mt. 2 to 5 pth Sqm. Sqm. Hecta Hectare.) 7) Sqm. ( Hectare 5 Sqm. (2.19 5 (Avg.) 3.0 (13.13Hect (27.35 re) Hectare 0.085 ) Hectare) 0 are). Hectare) Hectare ) Molar 1.38 0 to 615 to 2000 1380X7= 1380X5X 500 2000 Bund 615- 1335- 1.5 1380X12X2 Sqm. 9660 Sqm. 2 = 1380 sqm & Sqm. 1380X10X2 Extensio 2.25 2.25 0 to =33120 =27600 (0.2 (0.97 Sqm. 300 (0.2 n Drain 2.2 Nil -- Sqm. Sqm. (2.76 Hecta Hectare) (1.38 Sqm. ( Hectare -- 8.905 5 (3.31 re) Hectare) 0.085 ) Hectare) Mtr. Hectare) Hectare ) Sarita 1.30 20.00 15.00 2000 1300X7= 1300X5X 500 2000 Vihar Sqm. 9100 Sqm. 2=13000 sqm & Sqm. 1300X12X2 1300X10X2 Drain 2.5 = 31200 =2600 (0.2 ( 0.91 Ha) Sqm. 300 (0.2 5.00 -- Hecta (1.30 Sqm. ( Hectare -- 8.415 0 Sqm.(3.12 Sqm. (2.6 re) Hectare) 0.085 ) Hectare) Hectare) Hectare ) TOTAL CD-V 85.09 Munges 10.36 10362x30x 10362x50x 10362x25x 2 10362x20x - 2 0.80 = h Pur 2 137 29.02 3.3 107. 2 = 2 2= Hecta 2 = Hectare Hectare 263.8 Drain 0m to 54 29.02 2 98 621720.00 =1036200 518100.00 re 414480.00 5- CD-XIII- 1575 66 29.02 24.9 Sqm Sqm Sqm Sqm or 82.21 10362m m = 8 or 62.17 or 103.62 or 51.81 41.45 (Avail 1575 36.9 Hectare Hectare Hectare Hectare able m to 8 land) RD. = 6600 181.6 m 4 RD.66 00m to 10362 M Bhupani 8.55 8550x30x2 8550x50x2 8550x25x2 2 8550x20x2 - 2 0.80 = a RD. 90 22 68 = 513000 =855000 = 427500 Hecta = 342000 Hectare Hectare 218.5 Chudani 0m to 65 22 3.0 43 Sqm Sqm Sqm re Sqm or 5- a Drain 2736 22 Un- 5 - or or 85.50 or 42.75 34.20 47.18 (includin m demar 51.30Hecta Hectare Hectare Hectare Availa g RD. cation re ble Haryana 6280 Portion land = portion) m to 171.3 8550 7 M RD.27 36m to 6280 M (Hary ana State) Mudhela 5.60 17.6 6.57 0.9 11.3 5600x15x2 5600x20x2 5600x25x2 2 5600x20x2 - 0.40 0.40 92.40- Drain 1 = 168000 = = Hecta = Hectare Hectare 9.86 CD-XIII- Sqm 224000Sq 280000Sq re 242000Sq Availa From or m m m or 22.40 ble 6950 to 16.80Hecta or or 28.00 Hectare land = 12550m re 22.40Hecta Hectare 82.54 re Nangli 0.93R 1.801 1.801. 1.5 00 930x5x1 = 930x5x1 = - - 930x20x1 - 0.40 0.40 = 3.6 -396 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Sakraw D. 0m .20 20 0 4650 Sqm 4650 Sqm = Hectare Hectare 0.14 ati Link to 385 or 0.47 or 0.47 18600Sqm Availa Drain, RD. Hectare Hectare or 1.86 ble CD-XIII- 1712 Hectare land = RD-0m m to 3.46 to 385m RD.22 = 385m, 62m CD-XIII- RD- 1712m to 2262m = 550m 439.0 TOTAL CD-XIII 1 1580. Total Projected Land Area FC-IV 23 2252. TOTAL AREA (FC-I + FC-II + FC-III + FC-IV) 10 ANNEXURE – II (c) : Detail of Effluent Irrigation System I. Keshopur Effluent Irrigation System (KEIS) The Irrigation Network under Civil Division No. XII also known as Keshopur effluent irrigation system (KEIS) consists of irrigation Channels and Minors and feeder channels spanning across a total length of 30.40 Km to take the effluent treated water from Keshopur Sewerage treatment Plant of Delhi Jal Board, thereafter being supplied by pumping through Keshopur Pump House and Tilangpur Kotla Pump House throughout the year for agricultural land for Irrigation in the Villages Nilothi, Ranhola, Mundka, Tilangpur Kotla, Baprola, Bakkarwala, Dichaonkalan, Hirankudna and Neelwal in Dist. West of Delhi. The total area irrigated is approximately 1630 Acres. A road network comprising of inspection path with cumulative length of approximately 20.00 Km also exist along the irrigation channels and minors to facilitates watch and ward, day to day repair maintenance etc. in r/o the irrigation network which are also being used by local residents for daily commuting. The discharge of 180 cusecs is conveyed and distributed through above Irrigation Network System for irrigating the said agriculture land. II. Coronation Effluent Irrigation System at Burari (CTP) The Irrigation Network under Civil Division No.VII also known as Effluent Irrigation System for Burari Area consists of irrigation Channels and Minors and feeder channels spanning across a total length of 17.37 Km to take the effluent treated water from Coronation Pillar Sewage Treatment Phase-I&II (20 MGD), Phase-III (10 MGD) of DJB, Near Coronation Park of Delhi Jal Board, thereafter being supplied by pumping through Pump House at Burari throughout the year for agricultural land for Irrigation in the Villages Burari, Jharoda, Bhalaswa, Mukundpur, Kadipur, Ibrahimpur in Dist. West of Delhi. The total area irrigated is approximately 325 Acres. A road network comprising of inspection path with cumulative length of approximately 17.37 Km also exist along the irrigation channels and minors to facilitates watch and ward, day to day repair maintenance etc. in r/o the irrigation network which are also being used by local residents for daily commuting. The discharge of 20 cusecs is conveyed and distributed through above Irrigation Network System for irrigating the said agriculture land.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 397 III. Okhla Effluent Irrigation System The Irrigation Network under Civil Division No. V also known as Okhla effluent irrigation system consists of irrigation Channel spanning across a total length of 05.00 Km to take the effluent treated water from Okhla Sewerage Treatment Plant of Delhi Jal Board, thereafter being supplied for Irrigation in the Villages Ali, Mandapur Khadar &Jaitpur in District (South-East) of Delhi. The total area irrigated is approximately 500Acres day-to-day repair maintenance etc. in r/o the irrigation network which are also being used by local residents for daily commuting. The discharge of 20 cusecs is conveyed and distributed through above Irrigation Network System for irrigating the said agriculture land. Conclusion: Due to rapid urbanization in Delhi Territory, thereby the agriculture land area in Delhi is diminishing, therefore, the necessity of remodelling / expansion of above Effluent Irrigation Systems is not envisaged. Key Plan of Effluent Irrigations Systems:398 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ANNEXURE III: SERVICE PLAN - DELHI CANTONMENT BOARD (DCB)[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 399 PERSPECTIVE PLAN FOR INFRASTRUCTURE SERVICE FOR DELHI - 2041 AGENCY: DELHI CANTONMENT BOARD 1. BACKGROUND - DELHI CANTONMENT BOARD The administration of Delhi cantonment is carried out through a Board, which has 16 members, out of which 08 are nominated/ Ex-officio members and 08 members are elected by the public residing in civil as well as military area. The civil and military populations reside in different pockets in the cantonment. The needs and challenges of both pockets differ from each other in respect of solid waste management. Basic information about Delhi Cantonment Board is mentioned below: S. No. Item Details 1 Year of establishment 1914 2 Total Area 10452 Acres 3 Total Population (Census 2011) 1,10,351 4 No. of wards 08 5 Commercial areas 02 6 Urban Villages 06 7 Schools 16 8 Slums 02 9 Length of Roads 50.60 km 10 Hospital/ Dispensaries 04 11 Parks 17 2. SOLID WASTE GENERATION IN DELHI CANTONMENT BOARD 1 SOILD WASTE GENERATION - Current status S. NO Item Details 1 Total solid waste generated per day 68 MT 2 Waste generated from civil area per day 23 MT 12 MT Dry waste 11 MT Wet waste 3 Waste generated from Army area per 45 MT 24 MT Dry waste day 21 MT Wet waste400 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 4 Total Dry waste processed per day in 30 MT waste to energy Plant at Okhla 5 Wet waste processed per day in waste to 07 MT energy plant at Okhla 6 Waste dumped in Landfill site at Okhla 31 MT per day CIVIL AREA - Current status 1. The Household waste is segregated into wet & dry streams at source. Approx. 95% segregation at source has been achieved so far. 2. All the waste collected from civil area is transferred to different Waste Transfer Centers (WTCs). 3. All the WTCs have been designed for the temporary storage of dry & wet waste, as separate fractions. 4. Rag pickers have been integrated into the system to pick up recyclable items, from the waste collected at the WTC’s. 2 ACTION PLAN FOR SEGREGATION AT SOURCE - MUNICIPAL SOLID WASTE CIVIL AREA ARMY AREA It is estimated that Municipal Solid Waste The population of army area is mostly likely to be generated from civil area by comprised of army troops. Therefore, it is 2041 will be 37 MT per day. The challenge estimated that there will be no difference in before the Board is to maintain the level of the quantity of Municipal solid waste source segregation in civil area. For this, generated today and which is likely to be the following exercise is being undertaken generated in 2041. on regular basis: a. A system is being worked out for on-site a. Two sanitary guides accompany the composting of food waste generated by door-to-door collection vehicle, they transit camps, officer’s messes, make announcement and make sure community kitchens of army units and that only segregated waste is institutes. collected. b. Further, it is proposed that army b. A register is maintained to keep a authorities will be asked to install de- check on those residents who are not centralized compositing machines. This handing over segregated waste. The step shall considerably reduce the repeated offenders to be penalized problem of segregation at source, which according to the provisions of Delhi in turn would lessen the amount of non- Cantonment Board solid waste recyclable waste being transported to the[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 401 Management Bye-Laws. landfill site at Okhla. c. Regular interaction with residents and c. It has been decided that station awareness campaigns in the form of headquarters and Delhi Cantonment street play, mohalla meeting etc. is Board will sensitize RWAs, existing in the organized to keep the residents aware army area, to segregate and process the and motivated on source segregation. wet waste in their own compound. d. Formal training is being imparted to Rag pickers/ Safaiwalas to improve the level segregation on monthly basis. The rag pickers were issued separate I- cards and have been successfully integrated into the system. 3 MUNICIPAL SOLID WASTE COLLECTION CIVIL AREA ARMY AREA For civil area, 14 door-to-door vehicles are For Army area, 27 vehicles have been deployed for collecting both dry and wet deployed to collect the solid waste. Separate waste, which is segregated at household bins have been provided for dry and wet level. These vehicles have been suitably waste. The waste collected from the army modified to carry the solid waste in area is directly taken to the processing plant segregated form. A few salient aspects of and landfill site at Okhla. door to door collection are as under: a. All vehicles have been fitted with tracking system (GPS) b. Announcement system with specific message for segregation has been incorporated. c. The staff has been deployed ward wise for the collection of segregated waste at source. d. The mobile numbers of the staff have been made public to ensure transparency and commitment of Delhi Cantonment Board.402 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 3. MANAGEMENT STRATEGY 3.1. DETAILS OF SORTING AND MATERIAL RECOVERY FACILITY There are eleven secondary storage points, with the facility of separate storage of dry and wet waste, within the territorial jurisdiction of Delhi Cantonment Board. Out of this, one secondary storage point at Tigris Road has been converted into sorting and material recovery facility with capacity to handle 30 MT waste daily. Further, rag pickers have been integrated into the system to pick up recyclable items, from the waste stored at Tigris Road. Accordingly, two more material recovery facilities will be developed to meet the need, which will arise in 2041. 3.2. DETAILS OF PROCESSING OF SOLID WASTE All the waste after collection is moved to waste transfer centers, where the recyclable waste is retrieved. Therefore, the solid waste is carried by respective vehicles to Okhla. On average, approximately 30 MT of dry waste and 7 MT of wet waste are disposed in the Waste to Energy and Waste to Compost plants respectively. The processing of waste at Okhla is done under the management of South Delhi Municipal Corporation. Only 31 MT of solid waste is being dumped at the landfill site at Okhla. 100% of solid waste, which is generated in Delhi Cantonment, is either processed or dumped at the landfill site, on a daily basis. A pilot project exclusively for the processing of food waste generated from market area, with a total capacity of 175 Kg, is fully functional for the last 2 years in the WTC at Tigris Road. It is also proposed that 4 to 5 sorting- cum- compositing machine, with a capacity of 10 MT each will be installed at different locations, within 4 years, to handle the wet waste generated within the territorial jurisdiction of Delhi Cantonment Board. 3.3. DETAILS OF MANAGEMENT OF PLASTIC WASTE There is a complete ban on the use polythene bags of less than 50-micron thickness. The Assistant Sanitary Inspectors keep a regular check in market area and also impose fine if someone is found in violation. A committee has also constituted to identify and replace specific items of non- biodegradable plastic like plastic straw, plastic spoon disposable plastic glass, plastic plates etc. with biodegradable items. These processes of replacement of non- biodegradable plastic items have been successfully achieved in Gopinath Bazar & the committee keeps visiting the commercial areas for ensuring that people and shop keeper get habituated for such practice.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 403 A baling machine has been installed in the waste transfer centre at Tigris Road, for making bales of plastic and polythene waste material, for ease of handling/ disposal through the rag pickers. 3.4. DETAILS OF MANAGEMENT OF HORTICULTURE WASTE A total of 17 parks of various sizes are being maintained in the Cantonment area. All the parks have been provided with pits for collection of horticulture waste. The horticulture waste is further carried to the nearest shredding machine, four of which have been installed in different areas of the cantonment. The shredded horticulture waste is converted into compost in the natural process, duly augmented with the spray of appropriate quantity of EVM. The compost generated is being utilized within its geographical limits. 3.5. DETAILS OF MANAGEMENT OF CONSTRUCTION AND DEMOLITION (C&D) WASTE a) On an average up to 1.0 metric tons of C&D, waste is generated in Delhi Cantonment area, on daily basis. b) A central storage facility for C&D waste has been created in Jharera village for temporary holding of the same before further disposal. c) The C&D waste is transported from the central storage facility to the processing facility setup at Shastri Park by IL&FS, under the management of EDMC. d) Explicit directions have been issued to all contractors working under Delhi cantonment Board, as well as Military Engineering services (MES), to follow the above procedure for the disposal of C & D waste. e) Vulnerable areas have been put under CCTV surveillance to prevent dumping at unauthorized sites. f) Punitive action is promptly taken against the defaulters.404 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ANNEXURE IV: SERVICE PLAN - EAST DELHI MUNICIPAL CORPORATION (EDMC)[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 405 PERSPECTIVE PLAN FOR INFRASTRUCTURE SERVICE FOR DELHI - 2041 AGENCY: EAST DELHI MUNICIPAL CORPORATION 1. MUNICIPAL SOLID WASTE MANAGEMENT (MSWM) Aspect Information required Generation Presently – 2600 TPD By 2040 – 6000 TPD Present estimations of Green waste – 1300 TPD Dry waste – 30 % and inert – 20% By 2040 Green waste – 3000 TPD Dry waste – 30 % and inert – 20% Management Separate management plans (collection, segregation and processing) for: strategy  Green Waste  Reusable Waste  Inert EDMC outsourced door-to-door collection of segregated waste collection and expected to achieve segregated collection by March 2021 and processing 2000 TPD- integrated facility at Ghonda Gujran by 2022. 1200 TPD - waste processing through bio - methanization. Management plans to include information regarding the following aspects: 1. Improving collection, segregation efficiency at local level (RWA/Mohalla/Market association/Solid waste zone/Wards etc.) EDMC has outsourced collection and transportation of Municipal Solid waste and Street Sweeping waste and any other solid waste specified by East DMC from time to time as per MSW Rules 2016. Broadly the work includes primary collection and transportation of Municipal solid waste (MSW) and street sweeping waste in segregated manner from406 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] households, slums, informal settlements, commercial, institutional and other non- residential premises, multi storied buildings, large commercial complexes, malls, housing complexes. 2. Maximizing wet waste processing (e.g., Composting, Bio-methanation etc.) locally  Decentralized accelerated compositing, presently, 10 numbers of 1 TPD capacity are operational and 02 plants of capacity 1 TPD are under progress  Home composting – 50 TPD  Decentralized Bio-methanation – 5 TPD (02 in numbers are operational), 10 TPD (01 in number is in progress)  Target: Decentralized accelerated compositing, 20 numbers of 1 TPD  Decentralized Bio- methanation, 10 numbers of 5 TPD  1 Material Recovery Facility (MRF) in each ward i.e. 64 numbers  Centralized Bio-methanation – 1200 TPD by September 2022 (a joint venture company is already been formed with NTPC) 3. Improving sorting and material recovery (MPD will recommend re- purposing of dhalao as material recovery facilities at the decentralized level) etc.  EDMC propose 01 MRF centre in each ward deals with recyclable material under process.  Details of existing/ proposed processing facilities on already allotted land. Shastri Park C & D Plant- 1000 MT- operational Vinod Nagar Workshop/ Parking - operational Geeta Colony Workshop/ Parking - operational Singhola Disposal of silt- operational (Narela) 4. Reclamation of landfill sites and reuse/recycle of legacy waste  Action plan for clearing legacy waste at Gazipur dumpsite is attached herewith as Annexure – IV (a).  After reclamation, land will be used for Technology Park showcasing[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 407 all the technologies of wet waste processing and recycling of waste. 5. Conversion of existing landfills to engineered/scientific landfills  There is no such type of proposal, however, whenever land is provided that will be constructed as engineered/ scientific landfills. Special plans for: Integration of informal sector in core SWM system (for improved management vis-a-vis ensuring safety, hygiene and healthy work conditions for the workers). EDMC to establish a system to recognize organizations of waste pickers or informal waste collectors and promote and establish a system for integration of these authorized waste pickers and waste collectors to facilitate their participation in solid waste management including door to door collection of waste. Marketing strategies for compost and other reusable/recycled products As there is less amount of compost produce from plant, the whole quantity of compost is being utilized in, Municipal parks and gardens generated from waste in EDMC area. There shall also be a provision for the households to directly deposit or sell their recyclable waste to Kabadiwala/ secondary market and deposit sales realizations in ESCROW account of EDMC and this amount of EDMC and this amount will be used for payment of collection of garbage. Awareness, capacity building and behavioural changes programs Annexure – IV (b) Other information Key infrastructure or special projects proposed for the plan period, along with details of projects and their timelines 2000 TPD Integrated facility waste management and Energy Generation facility will be developed at Ghonda Gujran by September 2022 as a JV between NTPC & EDMC Details of existing/ proposed processing facilities on already allotted land is attached as Annexure – IV (c) Future land requirement (if any) for scientific (engineered) landfill sites, provided only inert are to be dumped Land is required for Engineered/ Scientific Landfills, in future. At Sonia Vihar 100 acre of land is required for disposal of reject/ inert of capacity 200 TPD for 20 Years. This land belongs to DDA.408 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 2. Key targets that will be included in MPD 41 Action Plan: Component Curren Targe Phasing Plan t status t for 2041 MSW collection 100 % 100% Nil efficiency MSW 25 % 100 Settlemen 20 % 50 % 80 % segregation % t Pattern (To be (To be (To be efficiency accomplished accomplished accomplished ) ) ) CGHS September Dec, 2021 March, 2022 and Bulk 2021 generator s Planned September Dec, 2021 March, 2022 Colonies 2021 Un- September Dec, 2021 March, 2022 planned 2021 colonies JJ September Dec, 2021 March, 2022 Clusters 2021 Percentage of 10 % 100 green waste % In first year – 10% processed (e.g. In the 5th year- 25% composted or In the 10Th year – 100% any other processing method) locally Percentage of - 100 recyclable % In first year – 15% waste sent to In the 5th year- 50% recycling In the 10Th year – 100% centres/industr y[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 409 Identification List of informal waste workers / Kabadiwalas prepared and listing of informal waste workers and units (recyclers, kabariwalas, rag pickers etc.) Percentage of 10 % 100 March - 2022 identified % informal waste workers and units integrated with the formal MSW management plan Reduction in 50 % 90 % By September - 2022 waste going to land fill sites Reclamation of 140 MT as per action plan attached land fill sites (greening and processing of legacy wastes)410 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Annexure – IV (a) : ACTION PLAN FOR CLEARING LEGACY WASTE AT GHAZIPUR DUMP SITE East Delhi Municipal Corporation in maintaining a Sanitary Land Fill (SLF) near NH-24. This SLF site is spread in about 70 acres of Land. About 2000-22090 MT fresh MSW is received daily and about 3000, MT (as an average) of legacy waste is being processed daily. About 3.00 lac MT of legacy waste has been processed at SLF Ghazipur dumpsite. Time line to clear legacy waste of 140.00 lac MT is as follows:[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 411412 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Annexure – IV (b) : AWARENESS, CAPACITY BUILDING AND THEIR TIMELINES[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 413414 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)][भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 415 Annexure – IV (c) : DETAILS OF EXISTING/PROPOSED PROCESSING FACILITIES ON ALREADY ALLOTTED LAND416 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)][भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 417418 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ANNEXURE V: SERVICE PLAN - SOUTH DELHI MUNICIPAL CORPORATION (SDMC)[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 419 PERSPECTIVE PLAN FOR INFRASTRUCTURE SERVICE FOR DELHI - 2041 AGENCY: SOUTH DELHI MUNICIPAL CORPORATION 1. MUNICIPAL SOLID WASTE MANAGEMENT IN SDMC: Aspect Information Required Generation Approx. 7000 TPD in 2040-41 Estimated green waste- (biodegradable waste): @36%= 2520 TPD Estimated dry waste: @34% = 2380 TPD (Reusable waste paper, textile, plastic and rubber) Inert material @30% = 2100 TPD) Management (Collection, segregation and processing) strategy Door to door collection, segregation of green waste (biodegradable waste) and reusable waste though concessionaires and involvement of waste pickers in all four zones of SDMC. Green waste is being processed at Compost Plant Okhla, decentralization bio-methanation plants and through home composting. Inert (C&D waste) is collected in two zones 8t ward level through concessionaires/private contractors and the same is being processed at Bakarwala C&D waste plant and proposed C&D waste plant. Another .C&D waste processing facility is proposed at Maidan garhi/Tehkhand for South zone and Central zone. (Improving collection and segregation efficiency) RWA/ Mohalla/ Market association/ Solid waste zone/Wards etc.) Improving collection, segregation efficiency at ward level by awareness through public notices in newspapers, distribution of pamphlets, radios, nukkad nataks, education in schools, and interaction with RWAs through concessionaries by involvement of waste pickers. Interaction with RWAs through concessionaires by involvement of waste pickers. Wet waste is processed through composting at Compost plant, bio- methanation plants and decentralization composting at ward level. Three, 1 TPD and 5 TPD plants are presently functioning. One, 1 TPD and 5 TPD are under construction. However, such plants are proposed subject to availability of hand. Further, ward composting has been started locally through pits. Material Recovery Facility (MRF) to be setup at ward level for sorting of waste material at FCTS/Dhalaos. Some dhalaos where is possible will be used as material recovery facilities at ward level. Reclamation of landfill site at Okhla (dumpsite) is being done through bio mining of legacy waste. Reuse/Recyclable of legacy waste is being utilized is as under: - Refuse Derived Fuel (RDF): - Waste to Energy plant Okhla and private industries. Inert: - NTPC Eco park and Tajpur pit. C&D waste: - At SLF Okhla to cover the dumped waste and making of approaches.420 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] After completion of bio-mining/remediation of legacy, waste at existing SLF Okhla (dumpsite) will be converted into Engineered/Scientific Landfill/solid Waste Management facility. Establishing the system to recognize organizations of waste pickers and Establish a system for integration of the various waste pickers to facilitate their participation in solid waste management including segregation and door-to- door collection of waste through concessionaires ensuring safety, hygiene and healthy working conditions for the workers. Marketing of compost is being done through concessionaires of composite plant. Regarding other reusable/recycled products is being done through departmental as well as contractors and private participation. Awareness, capacity building and behavioural changes programs is being done through concessionaire as well as sanitation officers of department. Key 1. One Compost Plant Okhla, having capacity of 200 MT of MSW per day for infrastructure or making compost is being operated by concessionaire, M/s IL&FS. special projects 2. One waste to Energy Plant at Okhla having capacity of 1950 MT of MSW Proposed for per day to produce 23 MW of power is being operated by concessionaire. the plan period, 3. Another Waste to Energy Plant at Tehkhand having capacity of 2000 MT along with of Solid waste per day to 25 MW of power is under construction. This details of plant is likely to be functional in 2022. projects and their timelines. 4. Engineered Sanitary landfill at Tehkhand is to be developed up to Dec 2022. 5. Plant for processing of Refuse Derived Fuel (RDF) Tehkhand will be setup by Indian Oil corporation and NTPC. 6. Plan for processing of plastic waste at Tehkhand will be setup by Indian Institute of Petroleum Research (IIPR). 7. A 200 TPD material recovery facility is proposed at Tehkhand/Okhla under PPP model. Future land Future land requirement has been prepared and the same is annexed herewith requirement (if as annexure V (a). any) for Scientific (engineered) landfill sites, provided only inert are to be dumped. 2. Targets to be included in the MPD-2041: S.no Component Current status Target for 2041 Phasing plan 1 MSW collection MSW collection in some Door to door, 90% up to 2021 efficiency areas is being done collection of and 100% up to through MSW in entire 2025 Subject to the concessionaires by area of SDMC availability of funds involvement of waste will be done and lands. pickers in all four zones through of SDMC. concessionaires by involvement of waste pickers.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 421 2 MSW segregation MSW segregation in Segregation of 90% up to 2021 efficiency some areas is being MSW in entire and 100% up to done through area of SDMC 2025 Subject to the concessionaires by will be done availability of funds involvement of waste through and lands. pickers in all four zones concessionaires of SDMC. by involvement of waste pickers. 3 Percentage of 10% of green waste is 100% of green 25% up to 2021 green waste being processed at waste 50% up to 2023 biodegradable Compost Plant Okhla, (biodegradable bio-methanation plants, waste) will be 75% up to 2025 (e.g., composters, compost processed at composted or 100% up to 2030 pits etc. at ward level. compost plants, any other Subject to the bio- processing availability of funds method) locally methanation and lands. plants, composters, compost pits etc. at ward level. 4 Percentage of About 10% of 100% of 25% up to 2022 recyclable waste recyclable waste is recyclable waste 50% up to 2023 sent to recycling being sent to recycling will be sent to centres/industry centres/industry through recycling 70% up to 2025 waste pickers and centres/industry 100% up to 2030 private participation. through waste Subject to the Pickers and availability of private funds and lands. participation. 5 Identification Identification and listing 100% 25% up to 202 l and listing of of informal waste Identification 50% up to 20 3 informal waste workers and units and listing of workers and integrated with the informal waste 75% up to 2025 units integrated formal MSW workers and 100% up to 2030 with the formal management plan is units integrated Subject to the MSW being done through with the formal availability of management concessionaires in all MSW funds and lands. plan four zones of SDMC. Management plan will be done through concessionaires in all four zones of SDMC. 6 Reduction in Efforts are being done Likely to be 80% up to 2023 waste going to in reduction of waste done in 2030. 100% up to 2030 land fill sites going landfill site Subject to the through proce5sing of availability of waste at card level and funds and lands. setting up of new Waste to Energy Plants, decentralized, composting.422 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 7 Reclamation of Reclamation of landfill Likely to be 100% up to 2030 land fill sites site at Okhla (dumpsite) completed in Subject to the (preening and is being done though 2030. availability of processing of bio mining of legacy funds and lands. legacy wastes) waste. Thereafter this land will be converted into green/used for setting up Solid Waste Management facilities. ANNEXURE – V (a) REQUIREMENT OF LAND AGAINST THE 1500 ACRES AS PER PROVISION IN DELHI MASTER PLAN 2021 FOR IMPLEMENTATION OF SOLID WASTE MANAGEMENT FACILITIES IN DIFFERENT LOCATIONS IN ALL FOUR ZONES OF SDMC :- Sr. Name of Facilities Facilities Approx. Approx. Approx. No. facilities available required Land Land Remaining (In nos.) (In nos.) required available land (in (in sqm. required sqm. /acres) /acres) (in acres) 1 Community 92 102 102x300 = 92x 250 1.80 Bins/ 30600 sqm. sq.m or 5.7 Receptacles/ Or 7.5 acres acres (FCTS/PCTS) 2 Material Nil 2x4=8 8x2=16 Nil 16.00 Recovery acres Facilities (MRF) 3 Facilities for Nil 2x4=8 8x1=8 acres Nil 800 Kabariwala 4 Attendance 30 1x74= 74 74x100 Nil 1.82 Office for =7400 sqm SI/ASI or 1.82 acres Training 1x4=4 4x600= Nil 0.60 5 Centre Nil 2400 sqm. facilities for or 0.6 acres waste pickers and SDMC staff 6 Workshops 2 4x4=16 4x4=16 8.0 acres 8.00 and parking acres[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 423 space for vehicles engaged in Solid Waste Management. Processing 1 2 67+425= 67 acres 425.00 7 Disposal of 492 Solid Waste, acres C&D waste and Residue 8 Disposal of 2 10+300=310 10 acres 300.00 inert like soil acres fine fraction etc. 9 Processing/ Nil 4 4x2=8 acres Nil 8.00 disposal of Plastic waste Total 859.92 90.70 acres 769.22 acres acres424 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ANNEXURE VI: SERVICE PLAN – NORTH DELHI MUNICIPAL CORPORATION (NORTH DMC)[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 425426 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] PERSPECTIVE PLAN FOR INFRASTRUCTURE SERVICE FOR DELHI - 2041 AGENCY: NORTH DELHI MUNICIPAL CORPORATION 1. MUNICIPAL SOLID WASTE MANAGEMENT (SWM) IN NORTH DMC ASPECT INFORMATION REQUIRED GENERATION Total MSW: 9,000 TPD [assuming population of North DMC 1.80 crore (out of total population of Delhi: 4 crore in 2041)] Present MSW Generation is 4500 TPD Green (wet) waste: 3,600 TPD (Bio-degradable) Dry waste: 5,400 TPD (Non Bio-degradable) MANAGEMENT Present status of SWM is as under: STRATEGY Present population of area under the jurisdiction of North DMC is about 90 lacs having about 18 lacs residential units. At present, about 4500 TPD of Municipal Solid Waste (MSW) is generated and collected in six zones per day. Out of which, about 2300 TPD of MSW is collected from Keshav Puram, Civil Lines & Rohini Zones which is collected, processed and disposed off scientifically as per SWM Rules-2016 at Waste Processing Facility/ Waste to Energy (WTE) Plant at Bawana in Narela. The remaining 2200 TPD waste collected from City-S.P, Karol Bagh & Narela Zones is being dumped at Bhalswa landfill site without processing/ treatment. As such there a gap of 2200 TPD of MSW which needs to be addressed and processed. Per capita per day solid waste generation is 0.50 kg (500 gm). In order to ensure scientific disposal of the aforesaid remaining MSW, North DMC has planned to set up another WTE Plant either at Bhalswa SLF site or at Rani Khera in Narela. In pursuance of the matter, an MoU between Indian Oil Corporation Ltd. (IOCL) and North DMC has been signed on 19.1.2021 to set up an Integrated Waste to Energy Facility in the jurisdiction of North DMC by processing of the Municipal Solid Waste. Accordingly, long term tender incorporating provisions of SWM Rules, 2016, for collection & transportation of MSW for remaining three zones i.e. City-S.P, Karol Bagh & Narela Zones have been invited. Management Plan for Solid Waste Management: 1. About 55% of solid waste generated in the jurisdiction of North DMC is being processed & inerts are also disposed off scientifically at Narela- Bawana Waste Processing Facility. Salient features of this project/ agreement are as under:  It is a long term 20 years agreement based on PPP model executed on 17.7.2009  It is an integrated contract for end to end solution of solid waste which includes door-to-door collection (primary), transportation from secondary storage depots to the Narela-Bawana Waste Processing Facility, processing (compost &R DF), WTE Plant and disposal of inerts at engineered landfill site.  WTE Plant of 24 MW capacity is also operational.  Contract is valid upto year 2029.  Concession area comprises of 64 mpl. Wards (out of total 104 mpl. wards)[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 427  At present, about 2400-2500 MT of solid waste is received at this plant & by 2029, waste generation is expected to be 3500TPD.  Regular awareness programs through IEC activities etc. are carried out for reduction, re-use & recycle (3Rs) as well as emphasis is given on segregation of waste at source to improve the SWM. Ultimately, it will reduce the load on the Processing Facilities/ landfill sites. The residents are also made aware for utilising waste as wealth through household/ local composting. 2. For remaining waste (45 % ), an MOU has been signed between Indian Oil Corporation Ltd. (IOCL) and North DMC has been signed on 19.1.2021 to set up Integrated Waste to Energy Facilities in the jurisdiction of North DMC by processing of the Municipal Solid Waste at Rani Khera. Likely date of commissioning of this plant is Dec., 2022. 3. On pilot basis, decentralised bio-methanation/ compost plants of 5TPD (4 NOS.) & 1TPD (6 NOS.) are being installed under the jurisdiction cf North DMC, out of which 2 nos. 5TPD & 3 nos. 1TPD plants are operational. On the basis of success story, these plants would be replicated in all 104 municipal wards. For installation of these plants, adequate land is also required specifically meant for this purposes. Provision of land for solid waste management shall be duly earmarked in the proposed layout plans before notification. 4. 50 TPD recyclable plastic waste processing plant/ facility has also been proposed at Tikri Kalan in Narela. For which, RFP/ tender document is being prepared. 5. Land requirement for various activities for solid waste management upto the year 2041 is annexed as "Annexure – VI (a)". 6. 200 TPD Bio-methanation gas plant based on cow dung is under construction at Bhalswa Dairy and which is likely to commence operation by 31.12.2021. 7. Material Recovery Facility (MRF) having capacity of 4 TPD for sorting of recyclable materials such as paper, plastic, metal, glass etc. will be commissioned at Zakhira shortly. Similar MRFs are proposed in each ward depending upon the availability of land. Minimum land requirement is 1000 sqm for setting up of an MRF. 8. Remediation of legacy waste from SLF Bhalswa, which' is in operation since 1994, is being carried out. Out of total 80 lac MT of legacy waste, 11.90 MT has been bio-mined through trammels. Reclamation of the land is likely to be completed by June, 2022. 2. Key targets that will be included in MPD-2041 Action Plan: Component Current Status Target for 2041 Phasing Plan MSW collection efficiency 100% 100% N.A. MSW Segregation efficiency 55% 100% By 31.12.2023 Percentage of green waste 55% of 1800 TPD processed (e.g. composted or 100% of 6,000 = 990 TPD By 31.12.2023 another processing method) TPD . ' Say 1000 TPD locally428 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Percentage of recyclable waste sent to recycling centres/ 50% 100% By 31.12.2023 industry 25% by Dec, 22 Identification and listing of 839 nos. of informal waste workers and informal waste 50% by Dec, 24 100% units (recyclers, kabariwalas, workers 75% by Dec, 26 rag pickers etc.) identified 100% by Dec, 30 Percentage of identified informal waste workers and units --- --- As above integrated with the formal MSW management plan Reduction in waste going to 25-30% 80% 5% in every 5 years land fill sites Reclamation of land fill sites ONE no. at (greening and processing of --- By June, 2024 Bhalswa legacy wastes)[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 429 Annexure – VI (a) Land requirement for various activities for solid waste management up to 2041:430 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)][भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 431 ANNEXURE VII: SERVICE PLAN – NEW DELHI MUNICIPAL COUNCIL (NDMC) PERSPECTIVE PLAN FOR INFRASTRUCTURE SERVICE FOR DELHI - 2041 AGENCY: NEW DELHI MUNICIPAL COUNCIL (NDMC) Consider the following approximate population projections for New Delhi Municipal Council: At present, the fixed population of New Delhi Municipal Council is 2.67 Lakh as per 2011 census. Low Growth Scenario Medium Growth Scenario High Growth Scenario 3 lakhs 3.2 lakhs 3.5 lakhs The service action plan for master plan of management of Solid Waste of New Delhi Municipal Council for 2041 is as under:432 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 1. MUNICIPAL SOLID WASTE MANAGEMENT (SWM) IN NORTH DMC ASPECT INFORMATION REQUIRED GENERATION Total MSW likely to be generated 350 – 400 MT Estimates of green waste, dry waste 100 MT Wet waste (reusable waste and inert material) 250 -300 MT Dry waste MANAGEMENT Separate management plans (collection, STRATEGY segregation and processing) for; Green Waste Green waste — Organic waste convertors, Home Composting, compost pits, Biogas Plant and compost plant Okhla (for 100 MT Wet Waste} Reusable Waste Reusable Waste — 25 MT for recycling (NGOs and recyclers) Inerts Inert — Sent to SDMC landfill site from Waste to Energy Plant, Okhla Management plans to include information regarding the following aspects; Improving collection, segregation efficiency Door to door collection of at local level (RWA/Mohalla / Market waste and its segregation as Association / Solid Waste Zone/ wards per the Solid Waste etc.) management Rules 2016 i.e., Wet Waste, Dry Waste and Domestic Hazardous Waste. Maximizing wet waste processing (e.g., Already explained above. Composting, bio-methanation etc.) locally Improving sorting and material recovery Segregation of waste in situ (MPD will recommend repurposing of and also construction of dhalaos as material recovery facilities at Material Recovery facility for the decentralized level) etc. micro segregation of dry waste. Reclamation of landfill sites and reuse/ Does not pertain to New Delhi recycle of legacy waste Municipal Council Conversion of existing landfills to Does not pertain to New Delhi engineered / scientific landfills Municipal Council Special plans for; Integration of informal sector in core SWM Already integrated and system (for improved management vis-a- providing the mentioned vis ensuring safety, hygiene and healthy conditions. work conditions for the workers. Marketing strategies for compost and other The compost produced shall reusable / recycled products). he used in horticulture department of NDMC itself.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 433 The reusable / recyclables shall he handed over to authorized recyclers. Awareness, capacity building and Already are being run by behavioral changes programs. NDMC in full swing. The capacity and behaviors changes are being evaluated from time to time. 2. Key targets that will be included in MPD-2041 Action Plan: Component Current Status Target for 2041 Phasing Plan MSW collection efficiency 100% 100% N.A. MSW Segregation efficiency 100% 100% 100% Percentage of green waste processed (e.g., composted 100% 100% 100% or another processing . ' method) locally Percentage of recyclable Increase by 10% per waste sent to recycling 20% 100% year centres/ industry Identification and listing of informal waste workers and 100% (already 100% 100% done units (recyclers, kabariwalas, done) rag pickers etc.) Percentage of identified informal waste workers and units integrated with the 100% 100% 100% done formal MSW management plan Does not pertain Does not pertain Does not pertain to Reduction in waste going to to New Delhi to New Delhi New Delhi Municipal land fill sites Municipal Municipal Council Council Council Does not pertain Does not pertain Reclamation of land fill sites Does not pertain to to New Delhi to New Delhi (greening and processing of New Delhi Municipal Municipal Municipal legacy wastes) Council Council Council434 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ANNEXURE VIII: SERVICE PLAN – DEPARTMENT OF ENVIRONMENT, GNCTD AND DELHI POLLUTION CONTROL COMMITTEE (DPCC)[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 435 PERSPECTIVE PLAN FOR INFRASTRUCTURE SERVICE FOR DELHI - 2041 AGENCY: DEPARTMENT OF ENVIRONMENT, GNCTD AND DELHI POLLUTION CONTROL COMMITTEE 1. SERVICE PLAN FOR NON-MUNICIPAL SOLID WASTE MANAGEMENT IN DELHI FROM DEPARTMENT OF ENVIRONMENT AND DPCC: Aspect Information required Generation Estimates of C& D Waste: Current Status FY 2020-21 (Million MT) : 1.38* (3781 TPD) Target for 2041 (Million MT): 3.66** (10,027 TPD) *Estimation of C&D waste generation in Delhi, as per NITI Aayog Report Jan 2019 ―Strategy on Resource Efficiency in Construction & Demolition Sector‖ – 4,600 MT/day (1.38 million ton per annum) ** Considering 5% annual growth of C&D waste generation in NCT of Delhi Bio-Medical Waste: As per gap analysis study got done in 2020 for requirement of numbers & capacities of additional Common Biomedical Waste Treatment & Disposal Facilities (CBWTFs) in Delhi estimated total future biomedical waste generation in 2031 = 80000 kg/day. As per Central Pollution Control Guidelines dated 21.12.2016, prior to allowing any new CBWTF, prescribed authority {Delhi Pollution Control Committee (DPCC) in case of Delhi} is required to prepare an inventory or review with regard to the bio-medical waste generation at least once in 5 years in the coverage areas of the existing bio-medical waste treatment and disposal facility. Prescribed authority is also required to extrapolate the coverage area wise bio-medical waste generation for the next 10 years. E- Waste: No concrete data available. E-Waste Inventorisation exercise is proposed. Plastic Waste generation : 1500 MT/D Management Management plan for C& D Waste: Strategy Processing Capacity of Operational C&D Plants in Delhi (4150 TPD)  Jahangir Puri (Burari) – 2000 TPD  Shastri Park – 1000 TPD  Rani Khera (Mundka) – 150 TPD  Bakkarwala – 1000 TPD (C&D Waste received at 4 processing facilities in Delhi : 3151 TPD)436 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Proposed C&D Waste Processing Facilities in Delhi (2500 TPD)  Ranikhera – 1000 TPD (Under Construction)  Maidangarhi - 1000 TPD  Libaspur - 500 TPD (Land use to be changed by DDA) NCT of Delhi will require creation of additional annual processing capacity of 2 Million MT (5479 TPD) by 2041 as below: By 2026 – 0.5 Million MT (1370 TPD) By 2031 – 0.5 Million MT (1370 TPD) By 2036 – 0.5 Million MT (1370 TPD) By 2041 – 0.5 Million MT (1370 TPD) Bio-Medical Waste: For obtaining the authorization mandatory under Bio-Medical waste Management Rules, 2016, every health care facility is required to enter into an agreement with the concerned CBWTF for collection, transportation, treatment and disposal of the waste generated by it. Biomedical waste is collected, transported and treated by two Common Biomedical Waste Management Facilities (CBWTFs) operating in Delhi. In view of expiry of lease of one of the CBWTFs presently operation on land provided by Directorate of Health Services, Govt of NCT of Delhi, the DPCC has called Expression of Interests for bringing up two new CBWTFs on privately owned land for catering to the BMW generation in two regions to cater future generation of biomedical waste in next 10 years i.e. year 2031 Region 1: Shahdara, East and North East Delhi (fall in the trans Yamuna belt). Region 2: West, South West, Central Districts. E- Waste:  Delhi consisting of 11 districts, so each district should possess at least one collection centre to ease the drop of E-waste.  Atleast 3 nos. of E-waste ECO-Park (not less than 5 acres in area), one in each North, South and East regions of Delhi should be created where proper dismantling, refurbishing can be done.  Atleast two recycling units should be created in Delhi for efficient work and state board can easily verify the authenticity of dealers, refurbishers, dismantlers whether they are legally tied with recycler.  ATM can be installed where in return of every electronic equipment, cash back can be provided.  ULBs can provide toll-free number and door to door services to dispose-off E-waste. Service Plan for NCT of Delhi for Plastic Waste Management is Annexure VIII (a).[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 437 Other Bio-Medical Waste: information Under the provisions of Bio Medical Rules 2016, the department in the  Key business allocation of land assignment shall be responsible for providing infrastructure suitable site for setting up of common biomedical waste treatment and or special disposal facility in the State Government or Union territory Administration projects and the selection of site for setting up of such facility shall be made in identified consultation with the prescribed authority, other stakeholders and in during the plan accordance with guidelines published by the Ministry of Environment, Forest period, along and Climate Change or Central Pollution Control Board. with details of projects and The CPCB guidelines dated 21.12.2016 provides that alternately a CBWTF their timelines may also be allowed to establish on a land procured by an entrepreneur  Estimated land in accordance with the location criteria suggested under these guidelines. requirements for projects. The DPCC is in process of calling the expression of interests for 2 CBWTFs on privately owned land to cater the need for next 10 years (up to 2031) and project is likely to be completed by end 2022.However looking in to the present and future scenario there is a need to identify 3 plots of lands of size not less than one acre in three geographically distributed areas of Delhi (one in trans Yamuna for East, North East & Shahdara, second in South East, South, South West & New Delhi and third in Central, North, West & North West districts) so that CBWTFs can be made operational on Govt Land post 2031. As per CPCB guidelines, CBWTF shall preferably be developed in a notified industrial area without any requirement of buffer zone (or) a CBWTF can be located at a place reasonably far away from notified residential and sensitive areas and should have a buffer distance of preferably 500 m so that it shall have minimal impact on these areas. E- Waste:  Public Awareness sessions should be organized on regular basis.  Awareness programme for refurbishers, dismantlers, recyclers and dealers should be organized twice in a year. 2. Key targets that will be included in MPD 41 Action Plan: Component Current status Target for 2041 Phasing Plan Percentage of C&D 88.4 % [1.22 (3342 TPD)] 100 % NCT of Delhi will Waste Processed require creation of 3.66 (10,027 (Fresh + Legacy) additional annual TPD) processing Percentage of Recycled 107.4 % 100 % capacity of 2 C&D Waste Products Million MT (5479 [1.31 (3589 TPD) including (Tiles, Blocks, TPD) by 2041 as Legacy C&D waste Reinforcements, filling below: products] materials etc.) used. By 2026 – 0.5 Million [Offtake by Govt. MT (1370 TPD) Departments - 0.70 (1917 TPD) And Offtake by Private Parties - 0.61 (1671438 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] TPD) ] By 2031 – 0.5 Million MT (1370 TPD) By 2036 – 0.5 Million MT (1370 TPD) By 2041 – 0.5 Million MT (1370 TPD) Annexure VIII (a): Service Plan for NCT of Delhi for Plastic Waste Management in respect of Draft MPD 41 1. Application: Ministry of Environment, Forest and Climate Change, Govt. of India has notified the Plastic Waste Management (PWM) Rules, 2016 as amended by 2018. (i) These rules are applicable to every waste generator, local body, Gram Panchayat, manufacturer, Importers and producer. (ii) The rule 4 shall not apply to the export-oriented units or units in special economic zones, notified by the Central Government, manufacturing their products against an order for export: Provide this exemption shall not apply to units engaged in packaging of gutkha, tobacco and pan-masala and also to any surplus or rejects, left over products and the like. 2. Salient features of (PWM) Rules, 2016, as amended to date The salient features of (PWM) Rules, 2016 are described below: S. No. Items Description 1 Purpose Plastic waste minimization; Source segregation; Recycling; Collection of plastic waste fraction; Adoption of polluter‘s pay principle; 2 Application To Every: Waste generator; Local body; Gram Panchayat;[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 439 Manufacturer; Importers and Producer. 3 Conditions for Shade of Carry Bag should be natural as per IS: 9833:1981; Carry bags Provision of thickness for carry bags made of virgin or recycled plastic is, thickness>= 50 microns (made up of recycled or virgin plastic). Thickness of carry bags is not applicable to carry bags made up of compostable plastic; The carry bags made from compostable plastics shall confirm to the Indian Standard: IS17088:2008. The manufacturers or seller of compostable plastic carry bags shall obtain a certificate from the Central Pollution Control Board before marketing or selling; Plastic sheet or like, which is not an integral part of multilayered packaging shall not be less than fifty microns in thickness except where the thickness of such plastic sheets impairs the functionality of the product; Recycling of plastic waste shall confirm IS 14534:1998. Carry bags made of recycled plastics shall not be used for Packaging food stuff; Sachets using plastic material shall not be used for storing, packing or selling Gutkha, tobacco and pan masala; Vinyl Acetate - Maleic Acid - Vinyl Chloride Copolymer, shall not be used in any package for packaging Gutkha, pan masala and tobacco in all forms. 4 Responsible Local body; Stake-holders Gram Panchayat; Waste Generators; Producers, Importers and Brand Owners. 5 Marking or PET Polyethylene Terephthalate, Labeling HDPE High Density Polyethylene V Vinyl (PVC), LDPE Low Density Polyethylene PP Polypropylene PS Polystyrene Others ABS - (Acrylonitrile butadiene styrene), PPO- (Poly phenylene oxide), PC- (Polycarbonate), PBT- (Poly butylenes terephalate)440 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 6 Prescribed The State Pollution Control Board and Pollution Control Authority for Committee in respect of a Union territory; enforcement of the The concerned Secretary-in-charge of Urban Development of the provisions of these State or a Union Territory; rules; The concerned Gram Panchayat shall be the authority; District Magistrate or the Deputy Commissioner. 7 Responsibility of Retailers or street vendors shall not sell or provide commodities retailers and street to consumer in carry bags or plastic sheet or multi-layered vendors packaging, which are not manufactured and labeled or marked, as per prescribed under these rules; Retailers or street vendors if providing commodities in above mentioned packaging shall be liable to pay fines. 8 State Level State Government or the union Territory shall constitute SLMC for the effective monitoring of implementation of these rules; Monitoring Committee (SLMC) The State Level Advisory Body shall meet at least once in Six Month and may invite experts, if it considers necessary. 9 Annual Reports Every person engaged in processing or recycling of plastic waste shall submit annual report in Form-IV to local body by 30th a) Concerned April(Every year); persons/ Departments Every local body shall submit annual reports in Form-V to concerned Secretary-in-charge of the Urban Development Department by 30th June, every year; Each State Pollution Control Board or Pollution Control Committee shall submit annual reports in Form-VI to CPCB by 31st July, every year; The CPCB shall prepare a consolidated annual report on the use and management of plastic waste and forward it to the Central Government along with its recommendations before the 31st August of every year. b) Flow of Information 3. Plastic Waste (PW) Generation: Estimated PW Generation in Delhi: 1500 MT/D[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 441 4. Constraints in implementation of PWM Rules 2016, as amended 2018: 4.1. There are a number of constraints in implementation of PWM rules 2016, few of them are given below: a) Annual Reports are not submitted on-time by Responsible Agencies/Authorities by 30th June each year; b) Monitoring of implementation of PWM Rules by Urban Development Departments & Municipal Bodies is inadequate; c) Non-recyclable plastic wastes such as multi layered and metalized pouches and other thermoset plastic poses disposal problems; d) Use of sub-standard (<50μm) plastic carry bags, packaging films etc. pose problem in collection and recycling, thus, ultimately dumped on land, drains, rivers, e) Co-ordination of DPCC with Local Bodies in enforcement of use of sub-standard (<50μm) plastic carry bags & actions taken by ULBs. 4.2. Recommendations of SLMC: a) All departments including ULBs, SDMs and DPCC were advised to adhere to the directions of Hon’ble NGT dated 02.12.16 and 10.08.17 regarding complete prohibition on the use of plastic carrybags made of plastic less than 50 microns and are non- compostable in entire NCT Delhi a prohibition of use of disposable plastic glasses in entire NCT Delhi at hotels, restaurants and public as well as environmental compensation of Rs 5000/- per default. All agencies were directed to expedite the actions of seizure of plastic and imposition of fines. b) Further, all ULBs and DPCC were directed to design programmes for creating awareness among general public regarding prohibition on the use of plastic carrybags made of plastic less than 50 microns and are non-compostable in entire NCT Delhi a prohibition of use of disposable plastic glasses of the Plastic Waste Management Rules, 2016 as amended, 2018. c) The representative of plastic traders and manufacturing industry were also advised to educated and guide the trades/manufacturers to adhere to the provisions of Plastic Waste Management Rules, 2016 as amended, 2018. The concept of Extended producer’s responsibility was also discussed and it was desired that plastic trades/manufacturers association shall give their full cooperation this regard to the ULBs in framing the bye- laws.442 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 5. Environmental issues of PWM in Delhi: a) Littering of Plastic Waste in open lands, drains, bus stations, railway tracks, dustbins/dhalaos, roadsides, commercial areas, etc. b) Open Burning of plastic waste emit toxic gases, polluting ambient air. c) Unscientific/ unregistered plastic waste recycling/manufacturing poses threat to environment specially in residential areas; d) Eating/engulfing plastic waste along with food residues by cattles, birds etc. 6. Information, Education & Communication (IEC) Programme a) What is IEC: 1. To develop communication strategies to promote positive behaviour. 2. Create awareness among various stakeholders. 3. To make development participatory through advocacy. 4. To transfer knowledge, skill and technique to people. 5. To bring transparency in program implementation at field level. 6. To promote the concept of accountability and social audit. b) Role of IEC in Waste Management: 1. To inform, educate and inspire people to realize their roles and responsibilities and benefits of adopting right waste management practices. 2. To bring motivation, awareness and empowerment. 3. To bring transformational shift in waste management barriers: 4. Practice level barrier 5. Attitude level barrier 6. Knowledge level barrier 7. To reach all communities and to reach out to all kind including children, women, men, youth and elderly people. 8. To create awareness, sensitization and motivation of people to follow right hygiene, sanitation and waste handling practices.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 443 c) Types of Communication: 1. Mass Communication 2. Person to Person Communication d) Key ways of Communication: 1. At national or mass level TV commercials and advertisement can play role. 2. Handbook, leaflet and brochures. 3. Motivational hoardings catering to Swachh Bharat and posters at critical locations of city. 4. One to one meeting could be held at family and community level, since PWM involves attitudinal change. 5. A city centric waste management book. e) Funding pattern of IEC Programme: 1. IEC has 15% funds of total central allocation. 2. Out of this 12% is for States to conduct campaigns on public awareness for different issues of public health, hygiene and environment. 3. Campaign using different means, like short films, radio, plays, workshops, social media and radio. Newspaper and TV are excluded from this. 4. Remaining 3% is for MoHUA to run a national media campaign and to develop standardized methods for campaigning. 5. The IEC plan made by States should approve by HPC of States. 50% of the approved fund should be given to ULBs. 6. ULBs have to spend minimum 50% of the ULB funds for IEC. This fund cannot be used for any other purpose, like buying vehicles, construction or maintenance. 7. Technologies for Disposal of Plastic Waste: i. Mechanical Recycling. ii. Utilization of Plastic Waste in Road Construction. iii. Co-processing of Plastic Waste in Cement Kilns & Co-incineration in waste to energy plants. iv. Conversion of Plastic Waste into Fuel-oil (Chemical Recycling). v. Disposal of plastic waste through Plasma Pyrolysis Technology (PPT).444 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] (i) Mechanical Recycling: Mechanical recycling involves processing of waste into a product which characteristics similar to those of original product. This process involves the following steps: a) Collection and Segregation: The plastics materials have varying density; hence they are segregated/separated by floatation process. b) Cleaning, Drying and Sizing: The post-consumer plastics waste requires proper cleaning and drying. The cleaned plastics waste products should be sized; the dried flakes are fed into an extruder where they are heated to melting state and forced through the die converting into a continuous polymer product or strands. c) Pelletizing: The strands are cooled by water and cut into pellets, which produces reprocess granules. d) Fabrication into end product: Reprocessed granules used as raw materials for producing end products. (ii) Utilization of Plastic Waste in Road Construction: The process of road laying using waste plastics is designed and the technique is being implemented successfully for the construction of flexible roads at various places in India. Table1: Protocol for description of road laying process S.No. Description Executing Agency Collection and segregation of plastic Municipal Corporation, Nagar Nigam, Nagar 1. waste (Except chlorinated/ brominated Parishad & Nagar and Gram Panchayat plastic waste) Municipal Corporation, Nagar Nigam, Nagar Transportation and storage of plastic 2. Parishad & waste Nagar and Gram Panchayat Cleaning and sun drying of plastic 3. Municipal Body or PWD waste Shredding of plastic waste (2 to 4 MM 4. Municipal Body or PWD size) ˚ Heating of stone aggregate (160 C - 5. Municipal Body or PWD ˚ 170 C) Adding of shredded plastic waste (5 6. Municipal Body or PWD to10% w/w for 30 to 40 seconds) Coated aggregate is mixed with hot 7. Municipal Body or PWD ˚ ˚ bitumen (Temp155 Cto163 C)[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 445 The mix-plastic aggregate Bitumen- Municipal Body or PWD Construction of 8. mix (130-140˚ C) The mix can be used polymer (plastics) Coated Bitumen Road for road laying. Action Points: a) Utilization of Plastic Waste in Road Construction in Delhi Should be promoted; b) Promotion and awareness of technology through technology transfer, Newsletters and Direct marketing. (iii) Co-processing of plastic waste as Alternative Fuel and Raw Material (AFR) in cement kilns and waste to energy plants: Co-processing refers to the use of waste materials in industry process such as cement and power stations or any other large combustion plants. Co-processing indicates substitution of primary fuel and raw material by waste, recovering industry and material from waste. Waste material such as plastic waste used for co-processing are referred to as alternative fuels and raw material (AFR). Co-processing of plastic waste offers advantages for cement industry as well as for the Municipal Authorities responsible for waste management. On the other hand, cement producers or power plants can save fossil fuel and raw material consumption, contributing more eco-efficient production. In addition, one of the advantage recovery method used in existing facility, eliminating the need to invest on other plastic waste practices and to secure landfilling. Action Points: Development of technology for Co-processing of plastic waste as Alternative Fuel and Raw Material (AFR) in waste to energy plants, in Delhi. (iv) Conversion of plastic waste into liquid RDF (Oil): Steps involved in conversion of plastic waste into liquid fuel RDF (Fuel) are given below:  Mechanical segregation of plastic waste from mixed MSW dump yard/storage.  Transportation of segregated plastic waste through conveyor belt for optical segregation.  Optical segregation of plastic waste (only HD, LD, PP and multilayer packaging except PVC;  Shredding of plastic waste and dislodging dust and impurities.  Transportation of segregated (100%plasticwaste) into feeding hopper(reactor).446 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]  Feeding of plastic waste into reactor for random depolymerization in presence of additives.  Collection of liquid RDFs (Fuel).  Collection of rejects and solid waste (charcoal). Action Points: Development of technology for conversion of plastic waste into liquid fuel RDF (Fuel)in Delhi from concept to commercialization and promotes awareness of technology through technology transfer, Newsletters and Direct marketing. (v) Plasma Pyrolysis Technology (PPT) Introduction: Plasma pyrolysis is one of the technologies which could be opted for disposal of plastic waste. In Plasma Pyrolysis, high temperature is produced using plasma torch in oxygen starved environment to destroy plastic waste efficiently and in an eco-friendly manner. To find out its performance, Central Pollution Control Board (CPCB) sponsored a project titled "Plastic Waste Disposal using Plasma Pyrolysis Technology" to Facilitation Centre for Industrial Plasma Technology (FCIPT), Institute for Plasma Research, Gandhi Nagar (Gujarat). The experiment has been conducted using different categories of plastic waste such as thin carry bags, metalized and multilayer pouches etc. During the experiment, emission of pollutants i.e. particular matter (PM), Oxides of Nitrogen (NO2), Carbon Monoxide (CO), Dioxins and Furans were also monitored. The analytical data indicates that the emission of toxic pollutants including dioxins and furans are lower than the prescribed standards for hazardous waste incinerators. Pyrolysis of plastic (polyethylene) provides 90% combustible gases. Description: Plasma pyrolysis technology is the disintegration of organic/inorganic compounds into gases and non- leachable solid residues in an oxygen-starved environment. Plasma pyrolysis utilizes large fraction of electrons, ions and excited molecules together with the high energy radiation for decomposing chemicals. In this process the fourth state of matter i.e. plasmas (core temperature is around 20,000°K) is used for dissociating molecular bonds. Different types of plastic waste such as polyethylene bags, soiled plastic, metalized plastic, multi-layer plastic and PVC plastic can be disposed through PPT. In Plasma Pyrolysis, firstly the plastics waste is fed into the primary chamber at 850oC through a feeder. The waste material dissociates into carbon monoxide, hydrogen, methane, higher hydrocarbons etc. Induced draft fan drains the pyrolysis gases as well as plastics waste into the[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 447 secondary chamber where these gases are combusted in the presence of excess air. The inflammable gases are ignited with high voltage spark. The secondary chamber temperature is maintained at 105ºC. The hydrocarbon, CO and hydrogen are combusted into safe carbon dioxide and water. The process conditions are maintained such that it eliminates the possibility of formation of toxic dioxins and furans molecules (in case of chlorinated waste). This process is used by few Municipalities and hospitals; however, this can be useful for tourist place, hill stations, pilgrimage, coasts and other remote places. Cost of plasma pyrolysis plant for the disposal of plastic waste: Approximately plant cost of capacity 1 Ton/day is 1.7 Crore and 6.5 Crore for capacity of 10 Tons/day plant, excluding operational cost. Payback period of plasma pyrolysis plant of higher capacity (>1Ton/day) is around 4 to 5 years. With energy recovery system, plasma pyrolysis plant will be profitable. Merits of Plasma Pyrolysis Technology:  The plasma pyrolysis system can resolve the problems associated with particularly non- recyclable and low-grade plastic waste.  Generation of extremely high temperature in oxygen starved environment makes this technology useful for the safe destruction of plastic wastes.  This technology (PPT) can safely destroy chlorinated as well as multi-layer plastic wastes.  The plasma pyrolysis system can be installed in tourist/hilly locations.  PPT for the disposal of plastic waste along in conjunction with energy recovery makes it economically viable in higher capacity systems. Action Points: Development of plasma processing technologies in Delhi from concept to commercialization and promotes awareness of technology through technology transfer, Newsletters and Direct marketing. Way Forward for PWM: 1. Door to Door collection of MSW in 2 bins (dry& wet) shall enforced by Municipal Authorities; 2. Segregation and recycling of plastic waste should be carried out at Material Recovery Facility (MRF) to be set by each Local Body in Delhi. 3. Organize mass-awareness programme in various districts involving Municipalities & Stake- holders for not using less than fifty microns carry bags and anti-littering. 4. Setting up of squads for preventing open burning of PW shall be strictly prohibited.448 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 5. Plastics should be used as a resource for recycling, utilized in road construction, energy recovery (such as WtE Co- processing), PW into Oil etc. 6. Stopping use of single use plastic products such as carry bags, cups, plates, straw, thermocol products etc. 7. Promote use of compostable products certified by CPCB such as carry bags, cups, straws, etc. as an alternate to conventional plastics. 8. Utilization of plastic waste in different technologies. Summary of PWM:  Draft notification was also issued by the Central Government on 11th March, 2021, in exercise of the powers conferred by sections 6, 8 and 25 of the Environment (Protection) Act, 1986 (29 of 1986), for making certain amendments in the Plastic Waste Management Rules, 2016, issued vide G.S.R. 320 (E), dated the 18th March, 2016, for information of the public for making any objection or suggestion on the proposals contained in the draft notification in writing within sixty days w.r.t. thickness of Plastic Bags, Sheets and like shall not be less than 120 microns and non-woven Plastic Carry Bags shall not be less than 240 microns in thickness w.e.f. 30.09.2021. Further, complete ban on single use plastic since 01.01.2022 (single use plastic items: Plates, cups, glasses, cutlery such as forks, spoons, knives, straw, trays, wrapping/ packing films around sweet boxes; invitation cards; and cigarette packets, plastic/ PVC banners less than 100 microns, stirrers. However, above provisions shall not apply to commodities (including carry bags) made of compostable plastic materials (copy enclosed).[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 449 Key Targets for Plastic Waste in r/o MPD 41 Action Plan: Current Status of Plastic Waste: Approx. 1500 M.T. Per day Target for 2041: 100 % disposal/ recycling as per PWM Rules 7. ANNEXURE IX: SERVICE PLAN – DEPARTMENT OF POWER, GNCTD GOVT. OF NCT OF DELHI DEPARTMENT OF POWER 8TH LEVEL, ‘B’ WING, DELHI SECRETARIAT, I.P. ESTATE NEW DELHI.450 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] PERSPECTIVE PLAN FOR INFRASTRUCTURE SERVICE FOR DELHI - 2041 AGENCY: DEPARTMENT OF POWER, GNCTD 1. Projections for 2041: As per the projections, the peak load in Delhi will reach 19000 MW by year 2041. To meet such load, provision in Master Plan have to made for space for power infrastructure that will be required to establish sub stations, distribution transformers and right of way for electric poles and cables to meet future power demands. Year Population (in Power consumption (in Peak Demand (in Overall installed Millions) MUs) MW) capacity (MW) 2019 19 33082 7409 7901 2031 24.7 47167* 12269** 14110# 2041 29.1 63389* 19070** 21930# *assuming power consumption growth rate as 3% ** As per projections of Delhi Transco Limited #15% over and above the estimated peak demand 2. Land Requirement for Power Infrastructure in 2041: The land requirement has been worked out by Delhi Transco Limited and Delhi DISCOMs broadly in line with norms issued by DDA & Delhi Govt. and as per their experience at ground conditions. i. Delhi Transco Limited (DTL): The summary of perspective plan for Power Transmission Services for Delhi-2041 (MPD- 2041) as under: Voltage Tentative No. of Existing No. of proposed No. of proposed Total Level Land Reqd. substations substations (under substations (MPD- (sq. m.) pipeline or execution) 2041) 765kV 1,60,000 01 01 02 04 400kV 40,000 07 (including 03 09 19 Mandola) 220kV 7000 41 04 36 81 ● Total Grid Land: 2 x 160000 + 9 x 40000 + 36 x 7000sqm = 9,32,000 sqm[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 451 ii. Tata Power Delhi Distribution Limited (TPDDL) TPDDL majorly serves Northern part of Delhi. The current load in TPDDL area is served by 78 nos. of grid substations which is a mix of 66/11 kV and 33/11 KV. For the 33 kV belt, which is densely populated, it is assumed that the new land would be in smaller sizes and thus it has been considered that a 2 transformer grids (2 x 31.5 MVA, usable 44 MVA). For the 66 kV belt, 3 transformer grids (3 x 31.5 MVA, usable 66 MVA) is considered. Considering a diversity factor for power transformer loading, it is estimated that additional 70 nos. new grid substations will be required to meet normal load growth and an additional 20 grid substations to meet EV charging load. Thus a total of 90 new grid substations would be required. Space required for grids is 1250 sq meters. (50 x 25 sq. mtrs., min. two sides open) Considering diversity factor between power transformers, feeder and distribution transformers and accounting for bulk consumers, an additional 6850 MW or 7850 MVA of peak load has to be served by distribution transformers. Assuming 50-50 mix of dual and single transformer substation (32sqm), approximately additional 3750 dual transformer (80sqm) and 3750 single transformer substations (total 7500) would be required. ● Total Grid Land: 90 x 1250 sqm = 1,12,500 sqm ● Total Distribution Transformer land requirement = 3750 x 80 + 3750 x 32 = 4,20,000 sqm iii. BSES Yamuna Power Limited (BYPL) BYPL majorly serves the Eastern part of Delhi. Based on CAGR of 3%, BYPL load will increase from the present 1653MW to 3075MW in 2041. After including demand on account of EV and go electric drive, peak load is expected to increase further to 3600MW (approx). Based on peak load of 3075MVA, total grids required to meet the load is 88 nos. (approx). Considering the present 54 nos grids, land will be required for establishment of 52 new grids. Requirement for EV load will be additional. Land required for each grid will be 2000 Sqm (50 X 40 m). However with emerging technologies, we will try to optimize the land requirement. To meet 3600 MVA, desired capacity is 7200 MVA considering diversity factor. Based on the same, at least 1873 Nos new 11/0.433kV Substations will be needed. Requirement for EV load will be additional. Land required for each substation is 80Sqm (8 X 10 m). However with emerging technologies, we will try to optimize the land requirement. ● Total Grid Land: 52 x 2000 sqm = 104,000 sqm ● Total Distribution Transformer land requirement = 1873 x 80 = 149,840 sqm iv. BSES Rajdhani Power Limited (BRPL) BRPL majorly serves the Southern and South-West parts of Delhi. BRPL serves a geographical area of 750 sq kms with current annual peak load growth of about 5.88%. In FY 19-20, BRPL recorded peak load of 3211 MW which is 43.33% of Delhi peak (7409 MW). Assuming same share in 2041, the peak load of BRPL would be about 8263 MW (5052 MW additional) out of Delhi’s projected peak demand of 19070 MW.452 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Key upcoming loads in BRPL area includes, DIAL, DMICDC, RRTS by NCRTC, ITPO, DMRC, redevelopment projects by CPWD (Sri Niwaspuri, Kasturba Nagar, Tyagraj Nagar, Mohammadpur), urban extension in 4 zones (J, K1, K2, L). Presently, the load in BRPL area is being served by 99 nos. of grid substations which is a mix of 66/11 kV and 33/11 kV voltage levels. Considering a diversity factor for power transformer loading, 115 new grid substations will be required to meet normal load growth. Required space for a grid substation is 50x60 sqm. Each Substation area will accommodate 3 Power Transformers, GIS and 11 kV Panels, SCADA, Shunt Reactors, Batteries, Solar Systems, possible expansion in capacity and possibility to accommodate substation of voltage higher than 66 kV. Considering diversity factor between power transformers, feeder and distribution transformers and accounting for bulk consumers, an additional capacity of 11788 MVA at distribution transformers level would be required. For each 11/0.4 kV substation with two Distribution transformers of 1 MVA each, there will be space requirement of about 80 sqm. Space requirement for BRPL: a. Total Space requirement for 66/11 kV and 33/11 kV Grid Substation: 115 x 3000 sqm = 3,45,000 sqm. b. Total space requirement for 11/0.4 kV substation = (11788/2) x 80 sqm = 4,71,520 sqm c. Apart from above (a and b) land requirement for normal load growth, there will be additional requirement of land 57,000 sqm for 19 nos. grid substations and 77,120 sqm for 964 nos. of 11/0.4 kV substation in BRPL area, assuming 10% of normal load demand will be on account of EV charging load in 2041. Upcoming EV charging load includes DTC Bus, ESSL load on SDMC parking and other EV charging stations With above loading conditions and space provisions, on an average, there would be one grid substation in every 3 sq km and one DT substation in every 50,000 sqm area of BRPL. v. Gas insulated sub-stations Gas Insulated Substation (GIS) shall be promoted by DISCOMS that will have lesser space requirement. Provision must be kept in Master Plan-2041 for designated spaces in all new development projects and redevelopment projects for establishment of sub- stations, installation of distribution transformers and laying of power cables. Space for power infrastructure must be provided at right places (near to load centre). Technically feasible space for substations must be allocated for DTL/ DISCOM and proper “Right of way” to be ensured for power poles/ laying underground cable for present and future requirements. The Standard norms for Grid/Substation sizes is annexed as Annexure – IX (a).[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 453 3. UTILITY DUCT Utility Ducts (along and across the roads) are critically required to ensure proper laying of city infrastructure and also to maintain the laid infrastructure. The importance of same is acknowledged by all. Ministry of Road & transport issued circular vide F. No. RW/NH33044/29/2015/S&R(R) Dated 22.11.2016 regarding policy guidelines for accommodation of Public and Industrial utility services along and across National Highways. New main road development plan shall include the provision for subsurface space allocation among various utilities. That is dedicated corridors for power, telecom, gas, water and sewer need to be developed during the development of roads so that damage to other utilities can be minimized and systematic planning can be made for future growth. This will have a positive impact on the speed utilities can provide new power supply connections as well maintain existing ones. As one of the major reasons for faults in the underground network is damage by 3rd party, utility ducts would result in a near fault free network. This will help to increased ranking in Ease of Doing Business (EODB). Indicative arrangement as below. Figure 1 Indicative arrangement for Utility Duct The utility corridor requirement details as below: a. Subsurface utilities: Type Capacity Corridor Width 66 kV/33kV/ 11kV UG cables for main roads Around 100 MVA Min. 1.2m 11 kV & LT U/G cables for interconnecting internal Around 5 MVA Min. 0.7m roads454 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] b. Overhead network requirements: Type Capacity Corridor Width 66 kV O/H Double Circuit OH Line 110 MVA Min. 6m and 2.3m each side 33 kV O/H Double Circuit OH Line 60 MVA Min. 6m and 2.0m each side 11 kV O/H Line 5 MVA Min. 1.1m and 1.2m each side LT O/H Line 0.18 MVA Min. 1.0m and 1.2m each side There is a need to ensure constructing utility duct in all newly constructed roads and also explore possibilities to implement same in existing road also. 4. Cost estimates (in Rs. Crore) given by DISCOMs for converting 100% 11kV power cables to underground (without ducting): BRPL BYPL TPDDL 11kV network 729 27 2369 HVDS network 2574 726 790 Total (in crores) 3331 753 3159 Total Cost Rs. 7243 Crores Under Jagmagati Delhi, initial budget of 50 crores has been kept for FY 2021-22, for conversion of 11kV bare conductor to insulated conductor. 5. Vehicle switching from Fossil fuel to electricity The Delhi EV Policy, 2020 envisaged “accessible public charging facilities within 3 km travel from anywhere in Delhi” (Clause: 6.2.1) and the Ministry of Power, GoI vide guidelines and standards notified for Charging Infrastructure for EVs has also envisaged for “At least 1 Public Charging Station is to be available within a grid of 3Km. x 3Km.” DDA should include land planning for creation of Charging Infrastructure for EVs in Master Plan of Delhi 2041.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 455 6. Land/ Space Constraints: a) DISCOMs face severe space constraints for substations, feeders and other associated equipment despite taking several measures to reduce footprint of substations (like GIS, E- House, Package Station, etc.). There is rampant encroachment on power infrastructure in many areas leading to reliability, safety and power theft issues. b) A clear land policy is required for space allocation for substations, feeders and associated network equipment (like feeder pillars, distribution boxes etc.) in all existing areas based on present load density and future load growth. Land policy should specify land requirement for substations and associated network equipment in new developments including electrification of new areas, private development, EV charging stations and all new infrastructure development projects. c) Land Policy needs to incorporate measures to prevent encroachment of power infrastructure. d) Key Considerations for land allocation for 66/11kV & 33/11kV Grids: i. 66/11kV or 33/11kV grid is required for serving a load of 35MVA. ii. Based on projected peak load, total grids will be required to meet the load. iii. Considering the present numbers of grids, additional land will be required for establishment of new grids. Requirement for EV load will be additional. iv. Land required for each DISCOM grid will be 2000 Sqm (50 X 40 m). However, with emerging technologies, we will try to optimize the land requirement. e) Key Considerations for land allocation for 11/0.4kV Substations: i. Considering 1484 sq. Km area of Delhi and projected population of 29.1 million in 2041, the load density will increase which will probably highest in India. ii. Typically, 1 Nos substation is required for each MW and thus considering demand density in Delhi, around 15,000 substations/Distribution transformers will be required of different voltage levels. iii. Requirement will be higher for areas with higher load density. iv. Land required for each substation is 60Sqm (12 X 5 m). However with emerging technologies, we will try to optimize the land requirement. f) Land allocation to the concerned DISCOM need to be ensured in a time bound manner to maintain the reliability and quality of power.456 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 7. Major reforms undertaken in Delhi  The nos. of procedure have been reduced from 3 to 2: DERC vide order dt.18.12.2020 i.e. called Delhi Electricity Supply Code and Performance Standards (Relaxation) Third order 2020, reduce the number of procedures from three to two for release of Electricity connection the details are as follows: o Procedure 1: Submission of application along with all documents o Procedure 2: Field inspection & Energisation of connection  Time: For the period to be consider for DBR 2021 (i.e. May 2019 to April 2020), the electricity connections have been provided within 7 days where RoW permission is not required & within 14 days where RoW permission is required by Delhi DISCOMs.  The cost of getting electricity connection: DERC vide order dt.23.10.2019 has reduced the cost for electricity connection for 150kVA consumers from Rs. 25,000/- to Rs. 15,000/-. For sanctioned load More than 5kW and up to 150kW the cost is (Rs. 3000 + Rs. 500 per kW or per kVA as the case may be for the load beyond 5kW), limited to a maximum of Rs. 15000/-.  Reliability of Supply: Following steps are required for improvement of reliability of supply (SAIFI & SAIDI) in long term: Conversion from Overhead to Underground System, Dedicated corridors for laying Electrical network.  Steps taken by DISCOM’s to improve SAIFI & SAIDI: Upgraded from the conventional SCADA to Advanced Distribution Management System (ADMS). ADMS is an integrated platform with one user interface for SCADA, DMS, OMS, GIS, ERP, CRM, FFA and Meter Data Management System (MDMS). SAIFI - System Average Interruption Frequency Index, SAIDI- System Average Interruption Duration Index.  Formulation of Dig and Restore Policy: Dig and Restore Policy has been formulated by PWD Department for granting Online Right of Way permission by boarding all the Road owing agency on the single portal i.e. PDM (Plan, Dig & Monitor) software by Delhi Govt.  Government of the NCT of Delhi has notified self-certification for DISCOM’s installations up to 33 kV in place of 650 V vide notification dated 04.01.2017  Pole mounted transformers capacity enhanced from 250KVA to 500KVA as per CEA gazette notification dated 06.04.2015.  Simplification of Documentation for Getting New Electricity connection: Only 2 documents required i.e. ID proof and ownership proof vide DERC order dated 12.05.2016.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 457  Revision of application form for Getting New Electricity connection by removing certificate details of Electrical contractor, Lift inspector & Fire services by DERC order dated 24.04.2017.  New Connections up to 200 KW sanctioned load to be released at LT voltage level in place of 100KW only previously –Guidelines issued by DERC vide order dated 31.08.2017.  Payment of Demand note for release of electricity connection in first bill for applicants taking supply at LT level vide DERC order dated 31.05.2019.  Mandatory online applications in lieu of offline option for load above 50KVA as per DERC (Supply code and performance standards) Regulations 2017. 8. Reducing regulatory compliance burden: Dept. of promotion of Industry and Internal Trade (DPIIT), Govt. of India is Nodal Department for coordinating exercise of minimizing compliance burden on Industries/ business and on citizens. Department of Industries, GNCTD, is nodal agency on behalf of GNCTD. It is to identify further that which regulatory compliances, acts and rules can be repealed, simplified or made online. Thirteen services in consultation with DISCOMs were identified which required compliances from citizens of Delhi and referred to DERC for examining to reduce compliance burden on citizens. Presently only one compliance has been identified for making it online. The reform is as under: Dept. Burdensome Short Compliance Action to Timeline Act/Rule & Description type be taken Provision Renewals Delhi Filing of Petitions DERC Filing of Implement 31.03.20 Electricity under Section adjudicates on Petition e- filing 21 Regulatory 142 of Electricity Petitions filed petitions Commission Act 2003 and under Section other than 142 and section 142 of matters other Electricity 2003 than under before the Section 142 of Hon’ble Delhi Electricity Act Electricity 2003 Regulatory Commission458 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 9. Renewable Energy and Sustainable Power Consumption Various efforts are being made within Delhi towards harnessing renewable energy. The overarching national policy through the assigned Renewable Purchase Obligation (RPO) as well as the state level solar policy 2016 sets out clear targets for enabling the transition towards renewable energy. As per the RPO targets for Delhi, it needs to meet about 19% of its consumption from renewable by 2022. The Solar Policy 2016 estimates a solar energy potential of 2500 MW for Delhi and target implementation of 1995MW to be installed by 2025. The Government of NCT of Delhi launched “Mukhya Mantri Kisaan Aay Badhotari Solar Yojna” to install Solar Panels in such a way that farmer(s) can do farming (s) beneath the solar panels. This scheme was devised to facilitate land owners to utilise their lands for economic uses by installing solar panels, thereby minimising misuse, unauthorised constructions and ensuring balanced development and retaining the green character of these areas. The farmer(s) of Delhi can get additional fixed income by installation of solar power plants. The salient features of “Mukhya Mantri Kisaan Aay Badhotari Solar Yojna” is as under:  Solar Panels at raised structure of 3.5 meters to allow farming on agriculture land of peripheral Green Belt villages.  No change of land use, farmer(s) to continue farming.  No investment required from farmer(s), investment to be done by Solar Power Developer.  Farmer(s) to get ₹ 8333/- per month per acre of land with an increment of 6% per annum upto 25 year, additionally, 6000 units electricity per annum per MW of plant  Minimum capacity of Solar plant 1 MW, to be installed on 06 acres of land (approximately 1/3rd of the land to be covered by solar plant)  Evacuation of power to be facilitated by DISCOMs. Under “Mukhya Mantri Kisaan Aay Badhotari Solar Yojna” the Government Departments were envisaged as the power purchaser, assuming costly power generated through this scheme as solar power plants are to be installed at raised structure. Further, Government of India launched a scheme named as “Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan” or PM KUSUM scheme under which solar power plants can be installed on agriculture land, barren land, pasturelands and marshlands of farmers. This scheme mandates power generated shall be purchased by DISCOMs at pre-fixed levelised tariff or tariff discovered through bidding. The salient features of PM KUSUM are as follows:[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 459  PM KUSUM to be implemented through DISCOMs and DISCOMs are entitled for to get Performance Based Incentive @ 40 paise per unit purchased or Rs. 6.6 lakhs per MW of capacity installed, whichever is less, for a period of five years from the COD.  Solar plant of capacity 500 KWp to 2 MW. In specific cases based on Techno-Commercial Feasibility smaller than 500 KWp are allowed.  Power shall be purchased by DISCOMs. Furthermore, Power Department has envisaged merging both schemes for smooth implementation and benefit to stakeholders’ viz. DISCOMs and Farmer(s).  Delhi DISCOMs have been allocated 62 MW by MNRE, GoI under PM KUSUM scheme.  Draft documents prepared and letters sent to DERC and Delhi DISCOMs for comments on mode of scheme execution, levelized ceiling tariff and draft PPA. 10. In respect of installation of Solar PVs on rooftop of group housing societies, only 59 societies have installed SPVs. There is a huge scope of installing SPVs in the remaining 1841 societies in NCT of Delhi. It is therefore proposed that all the remaining CGHS societies and other multi storied societies should be mandated to install solar rooftop plants. With Solar installation on government land, buildings, all private buildings, Delhi can generate about more than 2000MW of solar power. Further, SPVs can also be installed on canals and highways which would enable Delhi to meet 40% of peak demand of power through solar energy. Together with the renewable energy purchases, Delhi can meet more than 50% demand from renewable energy. To sum up, DDA requires to consider the following:  Making mandatory provision for Solar PV installation in existing buildings also.  Promote Solar PV installation on vacant land available with government agencies. This can also help in mitigating/eliminating encroachment problems. 11. Building design and layout considerations for reduced demand of HVAC:  Provision of HVAC to reduce peak load is there in ECBC – 2017 notified by Bureau of Energy Efficiency (BEE), Ministry of Power, GoI.  Energy Conservation Building Code (ECBC) for commercial buildings was notified by BEE, GoI in 2007 and updated version was notified in 2017.  The Energy Conservation Building Code (ECBC), is a document that specifies the energy performance requirements for commercial buildings that have a connected load of 100 kW or greater or a contract demand of 120 KVA or greater that are to be constructed in India and is mandated by the Energy Conservation (EC) Act, 2001.460 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]  ECBC encourages energy efficient design or retrofit of lightning & control fixtures in the existing buildings so that it does not constrain the building functions, comfort, health, or the productivity of the occupants and also have appropriate regard for economic considerations (life cycle costs i.e. construction + energy costs are minimized). ECBC defines the norms of energy efficiency of building equipments and takes into consideration the climatic region of the country, where the building is located. Norms have been developed to cater different climatic zones in India such as: Composite, Hot & Dry, Warm & Humid, Moderate and Cold.  ECBC provides design norms for: o Building Envelop: It includes Thermal performance requirements for walls, roofs and windows except for unconditioned storage spaces or warehouses. o Comfort Systems & Controls: It includes the energy performance of heating, ventilating, air conditioning and service hot water & pumping and their controls. o Lighting & Controls: It includes interior and exterior lighting, day lighting and lamps & luminaries performance requirements. o Electrical and Renewable Energy Systems: It includes the energy performance of motors, transformers, DG sets, UPS and energy metering.  ECBC can effectively be implemented by participation of various stakeholders such as DDA, PWD, MCDs, Council of Architecture, NBCC, DISCOMs, and Private Builders/Engineers/Architects etc.  In Delhi, DDA prepares and notifies the Building Bye-Laws and provisions of ECBC-2007 have already been included in the bye-laws for some building types by DDA. So far DDA has included the provisions of ECBC in UBBL 2016:  UBBL 2016 U/s 3.2, table 3.5 (4e), has made mandatory compliance measures (for all buildings having plot area from 50,000 m² to 1, 50,000 m²) as recommended in the Energy Conservation Building Code (ECBC) 2007 of the Bureau of Energy Efficiency, Government of India. However, there are no provisions for making ECBC mandatory (as a whole) for buildings except the area mentioned above, only few components of ECBC incorporated.  Comprehensive mandatory provision is required to be included in the Delhi’s Unified Building Bye-Laws (UBBL) 2016 which comes under purview of DDA. Previously, DDA was requested to incorporate provisions ECBC in Delhi’s UBBL by DDA vide Secretary (Power) DO letter dtd: 01.09.2020. (copy attached)[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 461  Ministry of Housing and Urban Affairs (MoHUA), GoI has also directed DDA vide OM dtd: 21.09.2020 to consider necessary amendments to include the provisions of ECBC guidelines in Unified Building Bye-Laws (UBBL).  Further, Bureau of Energy Efficiency (BEE), GoI has also launched Eco-Niwas Samhita (ENS) for residential buildings and residential part of mixed land used projects build on plot area ≥ 500 square meters in 2018. In the first phase minimum standards for the building envelop was launched to limit heat gain or heat loss of the residential building comprising adequate day lighting potential and ventilation. BEE, GoI is developing Eco- Niwas Samhita part–II for setting up minimum standards for the Electromechanical Equipments for efficient use of energy in residential buildings, which may be released shortly. The provisions of ENS have to be incorporated in Unified Building Bye-Laws (UBBL).  DDA is being continuously followed up by Power Department for making requisite amendments in UBBL to incorporate provisions of ECBC for commercial & residential buildings.  It is proposed that DDA should urgently amend UBBL & incorporate the provisions of ECBC for commercial and residential buildings. It is also proposed to promote adoption of Energy Efficiency measures in electricity usage. 12. Installation of smart meters (by DISCOMS) The planning for installation of smart meter by respective DISCOMs is as under: S.No DISCOM Total Consumers Total Smart meters DERC approval (in lacs) installed (in lacs) taken (Nos. in lacs) 1 BRPL 27.3 (4881 numbers) 3 2 BYPL 17.7 (147 numbers) 1.7 3 TPDDL 18.2 2.1 7 4 NDMC 0.7 0.6 - Total 63.9 2.7 11.7  Total Consumer base of Delhi : 63.9 Lacs  Total Smart Meters installed : 2.7 Lacs  Balance Smart Meters to be installed : 61.7 Lacs462 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]  Each smart meter costs around Rs. 3000 and approx Rs 6000-7000 including overall logistics. Replacing all balance 61.7 lacs meters with smart meters under CAPEX model, the cost will be around Rs. 3700-4300 crores  Under OPEX model of EESL, NDMC has installed 60000 meters for project cost of Rs. 61.68 crores for 8 years i.e. Rs. 10280 / consumer for 8 years.  For balance 61.7 lacs consumers under OPEX Model based on NDMC estimation, the overall cost will be Rs. 6342 Crores for 8 years.  For targeting all the consumers, DERC will be requested for an early order for approving CAPEX / OPEX model.  Delhi DISCOMs shall also be asked to go for installation of smart meters for all consumers in NCT of Delhi in time bound manner. Annexure – IX (a) Norms for Land Size for different Grids / Substations: I. GIS (66kV / 33kV) The guidelines for plot size of GIS substations were framed vide minutes of meeting dated 12.09.2016. The guidelines are as under: ● 50m x 30m (Two side open and rectangular plot. Right of Way of 6m required) ● 55m x 30m (One side open (longer side of plot). Rectangular plot. Right of Way of 12m required) ● 40m x 50m (One side open (Shorter side of plot). Rectangular plot. Right of Way of 12m required) ● In case of irregular shaped plot or no parallel road to plot, the plot size will be decided on the basis of joint inspection of officials of DDA & DISCOMs. II. DDA order dated 09.09.2003 for Air insulated Sub Stations: ● 185m x 160m: Plot size for 220kV sub stations. Size can be further reduced if 33kV / 11kV not required. ● 95m x 90m: Plot size for 66kV sub stations. ● 60m x 45m: Plot size for 33kV sub stations. ● 10m x 8m: Plot size for 11kV sub stations. III. Reference for 11/0.4 kV DT Substation space requirement ● Clause 6(4) of Chapter on schedule of charges of DERC Supply Code 2017 read with amendments. ● SDMC Circular dated 30.03.2017 regarding provision of substation space.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 463 Annexure – IX (b) Clause 6(4) of Chapter on schedule of charges of DERC Supply Code 2017: (4) The developer/applicant taking supply at Low Tension level for any premises or for re- constructed premises, requiring LT Service connections whose: i. total cumulative demand of all floors in the plot/ building for LT service connection exceeds 100 kW/108 kVA; or ii. total cumulative built up area of the premises in the plot/building exceeds 1000 sqm; or iii. plot of size above 300 sqm or above; shall provide the space for installation of distribution transformers, as per the required load. Provided that the minimum space required to be provided by the developer/applicant for installation of distribution transformers/ equipment shall be as per circular no. South DMC/0148/SE(B)HQ/Addl. ComI/17 dated 30.03.2017 notified by South Delhi Municipal Corporation or as amended from time to time, annexed at annexure IX (c): Provided further that the existing consumer shall also be required to provide the space as above, in the event of: i. enhancement of existing load on account of additional construction in the premises and consequently the total built up area exceeds 1000 sqm of the plot/building or their total LT Service connections demand exceeds 100 kW/108 kVA; or ii. enhancement of load based on maximum demand readings for the electricity connections energized on or after 1.9.2017 and the total LT Service connections demand exceeds 100 kW/108 kVA; Provided also that if the required space is not provided by the applicant or the developer, the distribution Licensee may refuse the grant of additional load: Provided also that the consumer taking supply at LT voltage level, irrespective of its sanctioned load or the contract demand as the case may be, shall also provide the space to the licensee for installation of meter, and part of service line up to the point of supply, to the extent that would fall within his premises. [Explanation: For the purpose of this sub-clause, the built-up area shall be as specified in the plan approved by the authorized agencies. In case, built-up area is not specified in the approved plan, the built-up area shall be taken as the carpet area plus the thickness of outer walls and the balcony]464 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Annexure – IX (c) SDMC Circular on Provision of Spaces for Substation[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 465466 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)][भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 467 ANNEXURE X: SERVICE PLAN - DELHI TRANSCO LIMITED (DTL)468 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)][भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 469 PERSPECTIVE PLAN FOR INFRASTRUCTURE SERVICE FOR DELHI - 2041 AGENCY: DELHI TRANSCO LIMTED (A Govt. of NCT of Delhi undertaking) 1. PROJECTED POWER DEMAND – 2041 As per the trends indicated by Department of Power, GNCTD, the power demand by 2041, is projected to reach 63,389 MU. Peak demand is likely to increase to 19,070 MW. Based on this it is estimated that the total installed capacity would also need to be increased threefold up to 21,930 MW (15% over and above the estimated peak demand). The current installed capacity for Delhi is 7,901 MW thus an additional installed capacity of 14,029 MW needs to be added in the coming plan period. The following Renewable Purchase Obligation targets have been set by MNRE for Delhi- 19% by 2022, 38.5% by 2031 (based on 450GW national target by 2030) and 50.5% by 2041 (further projection of 2030 targets). The total power consumption needs to be met from renewable energy based on these targets. Strategies shall be developed and efforts shall be made along with DISCOMs to meet the set targets. Areas that are going to be developed under land pooling policy, a thumb rule being practiced in the power sector for catering power requirement for 16-20L urban population, 1 no. 400-220kV substation and 3 nos. of 220kV substation has been considered for ensuring the system reliability. Downstream network (66kV, 33kV and 11 kV) as Power Distribution services for Delhi is required to be provided by the concerned DISCOMs in Delhi. Table 7: Abstract of total Substation requirements (765/400/220kV) Sl. Voltage No. of Existing No. of Proposed No. of Associated RoW No. Level Sub-Stations Substations (under Proposed Requirement execution) Sub-Stations 1. 765 kV 1 1 2 67m RoW for overhead transmission line 2. 400 kV 7 (Including 3 9 52m RoW for Mandola) overhead transmission line 3. 220 kV 4 4 37 35m RoW for overhead transmission line or 2X2 mtr for UG cable470 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Table 8: Zone-wise-Perspective Plan for Power Transmission Services (765/400/220 kV) for Delhi MPD 2041 ZONES Existing Voltage Requirement Tentative Requirement Remarks 400/220 kV Level for MPD area by the Year substation 2041 required (in sqm) Zone - NIL - - - A No ESS in this zone 220/33 kV Asaf Ali Being the 2027 This will provide Installed Road land scarcity power to New capacity (Wall city) in the area, Delhi railway 400 MVA minimum station, Delhi area Metro Rail and required upcoming multi 7000 sqm. story development. Zone - Dev Nagar 220/33 kV Under construction B (Karol Bagh) 400/220/33 IARI Pusa/ 200 x 200 2025 All the existing kV Dev Nagar sqm 400 KV station (40000 sqm) in Delhi are at the outer part of Delhi. Due to non-availability overhead corridor, power is being transmitted through underground cables. The 220kV underground cables have the limitations of shorter length and power carrying capacity.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 471 Therefore, a strong source of 400 kV level has become the urgent requirement in central part of Delhi. IARI PUSA are seems that 400 KV substation can be established for power requirement of central Delhi. Zone- Sabji Mandi 220/33 kV C Sanjay 220/66 kV Gandhi Existing Transport Nagar (SGTN) Gopal Pur 220/66 kV- 33kV Timar Pur 220/33 kV Under construction Gopal Pur 400 kV Up-gradation in under tendering New proposal to be included in MPD-2041 220/33 kV Azad pur Being the 2031 This substation (400 MVA) land scarcity will be required in the area, to cater the minimum natural growth area of nearby area required and will provide 7000 sqm the relief to existing Gopal Pur (33 kV level) and sabji Mandi area Zone- Electric Lane 220/33 kV - - D (Harish Chandra472 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Mathur Lane) Lodhi Road 220/33 kV Park street 220/66-33 kV Sarojini 10000 sq.mt 2023 NDMC is in Nagar process of Redevelopment of General Pool Residential Accommodation (GPRA) colony at Neetajee Naga, Nauroji Nagar & Sarojini Nagar through NBCC. NBCC has earmarked a piece of land for establishment of 220 kV substations. Zone- Harsh Vihar 400/220/66 E (East of Loni kV Road) Existing Substation Patparganj 220/66-33 kV Gazipur 220/66 kV Preet Vihar 220/33 kV Geeta 220/33 kV Colony New proposal to be included in MPD-2041 220/33 kV Dwarka Being the Immediate This proposed Puri/ land scarcity substation has Shahdara/ in the area, been planned Welcome minimum for future colony area development to required meet the 7000 sqm. industrial; and residential load growth around[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 473 Shahdara, Welcome Colony, Seelampur, Jafrabad etc. 220/66 kV GTB Being the 2025 This proposed Hospital/ land scarcity substation has Dilshad in the area, been planned Garden/ minimum for future Nand Nagari area development to required meet the 7000 sqm. industrial and residential load growth around Jhilmil, Dilshad garden, Nand Nagri etc. 400/220 Geeta Being the 2025 DDA may allot kV Colony land scarcity an area near in the area, existing 220 kV minimum DTL Geeta area Colony required substation from 7000 sqm. where 440 kV Transmission line can easily be connected. Therefore, no separate corridor for 400kV transmission line is required. 220/33 kV Mayur Vihar Being the 2027 This proposed land scarcity sub-station is in the area, for future minimum development to area meet the required industrial and 7000 sqm. residential load growth around Mayur Vihar area. 220/66 kV Yamuna Being the 2038 This proposed474 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Vihar/ Loni land scarcity sub-station is Road in the area, for future minimum development to area meet the required industrial and 7000 sqm. residential load growth around Yamuna Vihar area. Zone- Masjid moth 220/33 kV F AIIMS 220/33 kV Sarita Vihar 220/66 kV Existing R K Puram 220/66-33 kV Vasant Kunj 220/66 kV Okhla 220/66-33 kV Tughlakabad 400/220/66 kV Ridge Valley 220 kV BTPS 220/66 kV Under tendering (65 kV level) (480 MVA) New proposal to be included in MPD-2041 400/220 Near Sarita 200 x 200 2032 To meet the kV Vihar/ BTPS sqm long-term load (40,000sqm) requirement of south Delhi area. 220/ 33 KV Nehru Place Being the Immediate The location (300 MVA) land scarcity has already in the area, been minimum earmarked by area DDA for required establishment 7000 Sqm of 220/33kV ESS but land has not been handed- over to Power Dept. / DTL yet. 220/ 33 KV Malviya Being the 2027 During recent Nagar land scarcity communication[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 475 (300 MVA) in the area, with DDA has minimum informed that area there is required earmarked plot 7000 Sqm for ESS of area of about 3100 sqm in Malviya Nagar. After going through the DDA offer, the plot size is not sufficient. Therefore, it is requested to increase the plot size or earmarked sufficient area for 220 kV ESS at nearby area. 220/66KV West of JNU Being the 2036 This ESS will (480 MVA) land scarcity provide relief to in the area, existing 220 KV minimum ESS (Vasant area kunj) and will required help to manage 7000 Sqm the load growth. DDA may kindly earmark an area near Priya PVR area, for easy evacuation of power. 220/66KV Jasola Being the 2038 The ESS that (480 MVA) land scarcity will provide in the area, relief to existing minimum 220 KV ESS area (Sarita Vihar required and Okhala) 7000 Sqm and upcoming BTPS and will help to manage the load growth.476 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] DDA may kindly earmark an area near Okhla waste to power generation plant ZONE- Peeragarhi 220/ 33 KV G DIAL 220/ 66 KV Existing Naraina 220/ 33 KV Budella 220/ 66 KV Under tendering New Proposal to be included in MPD-2041 220/33KV Punjabi Being the Immediate This ESS is top (400 MVA) Bagh land scarcity priority to meet in the area, the load growth minimum of the area, a area 220 KV ESS required implementation 7000 Sqm is must. DDA may kindly earmarked an area near the road crossing of MG road and Vashisht Kumar Gulla marg (Vacant land) for easy evacuation of power. 220/ 66 KV Aero City Being the 2025 To cater the land scarcity load growth of in the area, commercial hub minimum ground airport area required 7000 Sqm 220/33 KV Janakpuri Being the 2029 This will provide (400 MVA) (Pankha land scarcity relief to existing road) in the area, Panjabi Bagh & minimum Naraina ESS area and will help to required manage load 7000 Sqm. growth. DDA may kindly[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 477 earmark an area between C3 road and C2 park (vacant land) for easy evacuation of power. 220/33 KV Hari Nagar/ Being the 2041 This will provide (400 MVA) Pratap land scarcity relief to existing Nagar in the area, Papankalan-I & minimum Naraina ESS area and will help to required manage load 7000 Sqm. growth up to 2021 & beyond. DDA may kindly earmark an area near bus depot at Pratap nagar (vacant land) for easy evacuation of power. 220/33 KV Kirti Nagar Being the 2032 This ESS is (400 MVA) land scarcity required to in the area, meet the load minimum growth of area existing area. required 7000 Sqm. ZONE- Rohini-I 220/ 66 KV H Wazirpur 220/ 33 KV Existing New Proposal to be included in MPD-2041 220/66 KV Rohini Being the 2038 This will provide (520 MVA) Sector-1 land scarcity relief to existing in the area, Rohini ESS and minimum will help to area manage load required growth up to 7000 Sqm. 2041 & beyond. DDA may kindly earmark an area near the478 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] existing NDPL grid in this sector. 220/33 KV Ashoka Being the 2029 This will provide (400 MVA) Vihar land scarcity relief to existing in the area, Shalimar Bagh minimum and Wazirpur area ESS and will required help to manage 7000 Sqm. load growth up to 2041 & beyond. ZONE- Mehrauli 220/66 KV Existing J New Proposal to be included in MPD-2041 765/400 Mandi 400x 400 2030 One 765 kV is (220 kV) Village Sqm. required to (160,000 meet the load Sqm.) growth of south Delhi, will provide grid power to existing and proposed 400 KV ESS. This proposed substation is planned at Mandi Village. This substation is required for major source of power supply to new developing as well as existing area at the south boundary of Delhi. DDA is also requested to provide RIGHT[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 479 of Way for 765 KV ESS from existing Agra- Jhatikara 765 KV transmission Line. 420/220 Rang Puri 200x 200 2027 To provide the kV/ 66kV Sqm. 220 KV source (20,000 to Vasant Kunj Sqm.) and future load growth of nearby area. 220 KV Maidan Being the 2024 This will provide Garhi land scarcity relief to existing in the area, Mehrauli & minimum Okhla ESS and area will help to required manage load 7000 Sqm. growth up to 2021 & beyond. The location may be earmarked by DDA near/ beneath DTL 220 KV Mehrauli- Tughlakabad overhead Line. 220 KV Aya Nagar 10000 Sqm. 2028 This will provide relief to existing Mehrauli ESS and will help to manage load growth up to 2021 & beyond. Further DTL has no 220 KV ESS in this south area to cater to the future load growth.480 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 220 KV Fatehpur 10000 Sqm. 2032 This will provide beri/ Asola relief to existing Sarita Vihar & Okhla ESS load growth up to 2021 & beyond will be very difficult to meet without this proposed substation. DDA may kindly earmark an area near Tughlakabad industrial area. 220 KV Bhati Mines 10000 Sqm. 2038 This will provide transformation capacity to meet the load growth of this extreme south corner of Delhi. ZONE- Najafgarh 220/66 KV Existing K-1 New Proposal to be included in MPD-2041 220 KV Bakkarwala 10000 Sqm. 2027 DDA may earmarked an area to meet the load growth due to new residential colonies like Lok Nayak Puram and other industrial developments are also proposed in this rea. It will much better, if an area may kindly[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 481 be earmarked near pocket-c of Lok Nayak Puram (vacant land), for easy evacuation of power as the rea is closer to existing 220 kV EHV overhead line 220 KV Dichoan 10000 Sqm. 2036 This 220 KV Kalan ESS will be required for long-term load requirement. ZONE- Bamnauli 400/220 K-II kV Papankalan- 220 KV Existing I Papankalan- 220 KV II Papankalan- 220 KV III Dwarka 400/220 Under Execution (400 kV level) sector-5 kV Bharthal 220/66 KV Under tendering New Proposal to be included in MPD-2041 220/66 KV Dwarka Being the 2034 The load growth Sector- 23 land scarcity is very in this in the area, zone. minimum Therefore, this area ESS will be required required to 7000 Sqm. cater the load in long term. ZONE- Jhatikara 765/400 L KV Existing Tikri kalan 400/220 kV/ 66kV482 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] New Proposal to be included in MPD-2041 400/220 Jhatikara 200x 200 2023 This zone has kV/ 66kV Sqm. been notified to develop under DDA land 400 KV Mitraon 200x 200 2036 pooling Sqm. scheme. These 220 kV Mundela 10000 Sqm. 2040 substations are Khurd required to 220 kV Chawala/ 10000 Sqm. 2030 cater the load of Tejpur proposed to be 220 kV Dhansa 10000 Sqm. 2030 developed under land pooling scheme. Further, DDA is requested earmarked the ROW for 400 KV and 220 KV overhead transmission lines. ZONE- Rohini-2 220/66 kV Existing M New Proposal to be included in MPD-2041 400/220 Barwala 200x 200 2026 This will meet kV/ 66kV Sector- 37 Sqm. the demand of (40,000 land pooling Sqm.) area of zone- N and growing demand of Rohini area 220 kV Begampur Being the 2034 No area has land scarcity been in the area, earmarked at minimum this area, but area the load growth required of residential 7000 Sqm. colonies of sector-21, 22, 41 Begaumpur, Pratap vihar and other[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 483 developments are also to be met through this proposed ESS. So, DDA may kindly be requested to allot an area in this zone, positively to meet the load. It will much better, if an area may kindly be earmarked near existing 66 KV ESS at sector-22 Rohini (vacant land) for easy evacuation of power, as the rea is closer to existing 220 KV EHV overhead line. ZONE- Kanjawala 220/ 66 KV Existing N 765 KV Under planning ISTS Narela New Proposal to be included in MPD-2041 400 KV Chandpur 200x 200 2033 Already Sqm. earmarked in MPD-2021 220 kV Nizampur 10000 Sqm. 2036 DDA may allot an area near Daryapur/ Bazidpur to cater to the proposed kanjhaala industrial area. 220 kV Qutub Garh 10000 Sqm. 2041 DDA may allot an area near484 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] nizampur to cater to the proposed kanjhaala industrial area also DTL do not has any 220 KV ESS at this western area to cater to the load growth. ZONE- Wazirabad 220/ 66 KV O Kashmiri 220/ 33KV Gate Existing Rajghat 220/ 33KV IP power 220/ 33KV Pragati 220/ 66 KV Power Maharani 400/220 400/220 KV is existing and creation of 66 KV 33 KV Level is Bagh kV/ 66- under tendering. 33kV IP Power 400 KV Upgradation of existing 220 KV will be done in due course of time. New Proposal to be included in MPD-2041 220/66 KV Karawal 10000 Sqm. 2028 DTL do not has Nagar/ any ESS on this Sabha Pur North Part of (beneath of Delhi, only one existing DTL distribution 220 KV substation of overhead BYPL is there. transmission To meet the line) load growth of soniya vihar, Karawal Nagar, Sabha pur, shiv Vihar etc. area, an area may be earmarked for future developments along the Pusta & Beneath of[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 485 existing DTL 220 KV overhead transmission line (Mandola- Wazirabad- two lines). So that, no separate corridor could be required of connectivity to this. ZONE- Bawana 400/220 P-I kV/ 66 kV Narela 220/ 66 kV Existing DSIIDC 220/ 66 kV Bawana Tikri kurd 400/220 The project is proposed to be commissioned by year 2023 kV/ 66 kV on land allocated by DDA. New Proposal to be included in MPD-2041 220/ 66 kV Holambi 10000 DDA may allot (480 MVA) Kalan Sqm. an area near Holambi Kalan to cater to the industrial area also with 35 m ROW corridor for overhead transmission line as this area has under development. 220/ 66 kV Budhpur 10000 DDA may allot (480 MVA) Sqm. an area near Budhpur to cater to the industrial area around around siraspur, budhpur, Chandpur etc. to cater to the load growth.486 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 220/ 66 kV Bankner 10000 DDA may allot (480 MVA) Village Sqm. an area near Banker to cater to the industrial area around DSIIDC Bawana and Narela etc. to cater to the load growth of residential areas around this location. If possible, DDA may allocate a land near Bankner village area, just beside the existing 220 KV EHV line. ZONE- New Proposal to be included in MPD-2041 P-II 765/400 Palla Village 400 m X 2041 This area has kV/ 220 kV 400 m been notified to (160,000 develop under Sqm.) DDA land pooling scheme. This sub-station is required for major source of power supply to new developing as well as existing area at the North boundary of Delhi. DDA may allot the land near to the Yamuna Bank and border of Delhi.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 487 220 kV Burari 10000 2026 Load demand Sqm. of nthhu Pura, Burari, Sant Nagar is growing in rapid rate. This substation will provide the relief to existing Gopal pur substation. DDA may allot the land near DTL existing lines. Note: Although the location has been earmarked in MPD-2021. 220 kV Mukhmel 10000 2032 This area has pur Village Sqm. been notified to develop under DDA land pooling scheme. DDA may allot the land near DTL existing lines. Note: Although the location has been earmarked in MPD-2021. 220 kV Mohmadpur 2041 This area has Village been notified to develop under DDA land pooling scheme. DDA may allot the land near DTL existing lines.488 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ANNEXURE XI: SERVICE PLAN - INDRAPRASTHA GAS LIMITED (IGL) INDRAPRASTHA GAS LIMITED, NEW DELHI. PERSPECTIVE PLAN FOR INFRASTRUCTURE SERVICE FOR DELHI - 2041 AGENCY: INDRAPRASTHA GAS LIMITED (IGL) Government of India is keen on making India a Gas based Economy – Aiming to push share of natural gas in energy basket from present 6% to 15% by 2030. Going ahead there is a need to lay greater emphasis on using cleaner fuels such as PNG & CNG and discouraging the use of polluting fuels such as FO, LSHS, Coal etc. The growing prices of diesel is resulting into decline in production of diesel variants & launching of more and more CNG variants by vehicle OEM’s.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 489 There are opportunities of expanding existing LNG infrastructure. There is also a huge potential for converting in-use diesel trucks/buses to LNG in Delhi. IGL may cash-in the opportunity to create EV infrastructure at existing CNG stations. New Segments such as E-Rickshaws/Two Wheelers can be tapped under battery swapping facilities, being planned by IGL. Below is the projected growth in CNG, Industrial, Commercial and Domestic sales volumes for the next 5 years. Considering the growth dynamics in the sector, IGL shall update its service plan once every 5 years. Table 9: Segment wise projected growth in sales volume (MMSCMD) Sl. No. Segment/FY 2021-22 2022-23 2023-24 2024-25 2025-26 CAGR 1 CNG 4.06 4.51 5.01 5.56 6.17 11% 2 Industrial 0.13 0.15 0.17 0.19 0.22 14% 3 Commercial 0.11 0.12 0.14 0.15 0.17 13% 4 Domestic 0.32 0.40 0.49 0.61 0.76 24% Total 4.62 5.18 5.81 6.51 7.32 MMSCMD: Metric Million Standard Cubic Meter per Day Table Source: IGL CNG: At present there is a shortfall of 35 CNG Stations in Delhi (area required for each station is approx. 1080 sqm); refer Annexure XI (a) for details of area wise requirements. In the next 5 years, 110 new CNG Stations are planned (excluding land pooling zones) and about 20 Nos. of Field Regulatory Station is required in the next 5 years (area required for each station is approx. 100 sqm). The area requirements for a Mother Station is 3000 sqm and for an Online Station is 1080 sqm. Below is the zone wise CNG station requirements for land pooling areas: Table 10: No. of new CNG stations required for each zone Sl. Zone No. of CNG No. name stations proposed 1. K1 5 2. L 10 3. N 5 4. P2 4 Total 24 Table Source: IGL PNG: IGL currently has 9, 66,098 households connected with PNG in Delhi (up to 31.10.2020). 9 lakh households are planned to be connected to PNG in the next 3 years.490 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Annexure XI (a): Land Requirement for CNG Stations S.No. Particular area Stretch Route Description 1 Ring road Bypass From Pragati Maidan CNG station to ISBT Kasmiri gate 2 Ring road Bypass From ISBT to Dheerpur CNG Station 3 Inner Ring road From Burari Chowk to IGL Shakurpur CNG Station 4 Outer Ring road From Dheerpur CNG station to Jahangirpuri CNG station 5 Outer ring road From Janakpuri District Centre to Madhuban Chowk 6 North Central Delhi Rajouri to Connaught Place (both sides)-1 7 North Central Delhi Rajouri to Connaught Place (both sides)-2 8 South Delhi From Hari Nagar Ashram to RKP 12 9 Outer Ring Road From Rohini Sector 19 CNG Station to Metcalfe House CNG Station 10 Ring Road area Mayapuri Metro Station to IGL Sarojini Nagar Station 11 Badarpur Border From Faridabad Delhi Border to CRRI (towards Delhi) 12 South Delhi RKP 3 to Nehru place (Both sides of the road) 13 South Delhi Kalkaji to Andrews Ganj Via Chirag Delhi (Both Sides) 14 South Delhi Sri Aurobindo Marg to Lado Sarai Hybrid(Both Sides) 15 South Delhi RKP 12 to Brar Square (Both sides of the road) 16 Mehrauli Badarpur road Mehrauli to Sarvodaya Enclave (Both Sides) 17 Main Chattarpur road KR Hospital to Satbari 18 Mehrauli Gurugram road Mehrauli to Indian Oil Janta Filling Station (Both sides) 19 Lajpat Nagar/Defence From The Oberoi to Moolchand Flyover Via Lala Lajpat Rai Colony Road 20 South Delhi August Kranti Marg (Both sides) 21 South Delhi (SDMC) Kalkaji to Andrews Ganj via Greater Kailash 22 Defence Colony, SDMC, Bhisma Pitamah Marg(Both Sides) Delhi 23 South East Delhi(SDMC) Batla House Market, Near By Area 24 South Delhi Moolchand to Pushpabhawan(Both sides of the road) 25 NH-8 NH8 (Dhaula Kuan to Rajokri), Both Sides 26 South Delhi AIIMS to Ashram on Ring Road (Both Side)[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 491 ANNEXURE XII: SERVICE PLAN – DEPARTMENT OF INFORMATION AND TECHNOLOGY, GNCTD GOVT. OF NCT OF DELHI DEPARTMENT OF INFORMATION AND TECHNOLOGY 9TH LEVEL, ‘B’ WING, DELHI SECRETARIAT, NEW DELHI – 110002.492 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] PERSPECTIVE PLAN FOR INFRASTRUCTURE SERVICE FOR DELHI - 2041 AGENCY: DEPARTMENT OF INFORMATION AND TECHNOLOGY, GNCTD Perspective plan for making Delhi digitally enabled as per National Digital Policy: 1. Creating a Robust Digital Communication Infrastructure  Provide Universal broadband connectivity at 1Gbps to every citizen  Enable fixed line broadband access to 100% of households  Achieve ‗unique mobile subscriber density‘ of 100% by 2041  Enable deployment of public Wi-Fi Hotspots; to reach  Ensure connectivity to all uncovered areas 2. Implementing a ‘Fibre First Initiative’ to take fibre to the home, to enterprises and to key development institutions e.g. schools, colleges, hospitals.  Promoting collaboration models involving state, local bodies and private sector as necessary for provision of shared duct infrastructure in municipalities, rural areas and national highways.  Facilitating Fibre-to-the-tower programme to enable fiberisation of 100% of telecom towers thereby accelerating migration to 4GB/5GB.  Incentivising and promoting fibre connectivity for all new development construction. 3. Establishment of a GNCTD Digital Grid:  Establishing Common service ducts and utility corridors in GNCTD and highway road projects, and related elements.  Facilitating development of Open Access Next Generation Networks 4. Ensuring a holistic and harmonised approach for harnessing Emerging Technologies  Synergising deployment and adoption of new and emerging technologies by: i. Creating a roadmap for emerging technologies and its use in the communications sector, such as 5G, Artificial Intelligence, Robotics, Internet of Things, Cloud Computing and M2M. ii. Simplifying licensing and regulatory frameworks whilst ensuring appropriate security frameworks for IoT/M2M/future services and network elements incorporating international best practices. iii. Earmarking adequate licensed and unlicensed spectrum for IoT / M2M services  Enabling Hi-speed internet, Internet of Things and M2M by rollout of 5G technologies.  Establishing GNCTD as a hub for cloud computing, content hosting and delivery, and data communication systems and services.  Leveraging Artificial Intelligence and Big Data in a synchronized and effective manner to enhance the overall quality of service, spectrum management, network security and reliability.  Information provided in the plan enclosed Establishing Centres of Excellence including in Spectrum Management, Telecom Security and Next Generation Access Technologies.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 493 5. Promoting Start-ups and SMEs:  Supporting Start-ups with various fiscal and non-fiscal benefits, including:  Academic collaborations, permissions for pilots and testing, concessions on imported software, mentoring support etc.  Promoting participation of Start-ups and SMEs in government procurement  Funding pilot deployments through USOF 6. Setting up of virtual schools: Govt. of NCT of Delhi will set up virtual schools to provide another channel to the public to pursue with getting education and skills in a formal virtual schooling. 7. Digital Delivery of Government Services: Government of NCT of Delhi will provide all its Government services to the citizens online as well as through mobile. The delivery of these services will be through secured Digi-Locker system. The citizen will use either web portal or UMANG platform to get the Government services. 8. Promotion of IT/ITES: Government of NCT of Delhi has already announced its policy to remove polluting industries from Delhi. Delhi Government will promote clean environment industries like IT and IT enabled services in Delhi. 9. Plans for provision of Public Wi Fi: In the current Wi Fi schemes of providing free wi-fi to the citizens of Delhi rental model is adopted. In this scheme all the bus stops (about 4000 in Nos) are covered. The data limit per user is 15 GB per month. By 2041, GNCTD, Delhi can plan to cover all the area with Wi Fi. This includes the Wi Fi access in all public vehicle and public place including schools, colleges, hospitals etc. The bandwidth at WiFi, Hotspots can go up to the speed of 1 GBPS per user. All the security concern should be taken care while planning the complete Wi Fi network for GNCTD. Smart Poles is the way forward to accelerate the growth. 10. Key infrastructure or special projects identified during the plan period, along with details of projects and their timelines:  A digitally enabled and connected city: Delhi shall need adequate infrastructure provisions to support the advent of higher service levels like network of 5G and above, full city fibre coverage, further integration of city's digital systems with loTs (Internet of Things), Artificial Intelligence (Al), Cloud Computing and Big Data etc. The highly equipped and digitally smart unified command and control centres set up by the local bodies can be the key drivers for effective urban management of Delhi.  With increased level of digitalization, data centres may be setup to meet the need for data storage, server management, etc. Such data centres may be developed by public and/or private agencies and can come up in industrial land use as per provisioned  Connectivity through fibre-optics is considered to be more efficient in terms of internet speed and reliability of services, "Fibre First Initiative" of NDCP 2018 and regulations of ROW Policy 2016 will facilitate augmentation of telecom infrastructure. Implementation of optic fibre shall be through collaborative models involving state government, local bodies and private sector as required for provision of shared telecommunication infrastructure.494 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]  Smart poles may be installed in public areas, comprising of CCTV cameras, air pollution monitoring sensors, telecom antenna, Wi-Fi hotspots/ microcells, solar lighting, public address and messaging systems, emergency call box etc., which in turn shall be connected to the digital systems of various city agencies. 11. Back-up plan for connectivity during emergencies/ disasters Developing a comprehensive plan for network preparedness, disaster response relief restoration and reconstruction  Strengthening network resilience by: i. Framing and enforcing standard operating procedures to be followed during disasters and natural calamities, including sectoral guidelines for disaster response and recovery applicable to various service providers.  Developing a Unified Emergency Response Mechanism by: ii. Creating an institutional framework with clearly defined roles and responsibilities, Standard Operating Procedures and technical guidelines iii. Enforcing obligations of service providers to share infrastructure, and ensure interoperability in emergency situations in a network-agnostic, operator – agnostic and technology-agnostic manner. ददल्ली मुख्य योजना-2041‍का‍ड्राफ्ट‍पाठ‍दस्तावेज‍और‍भूमम‍उपयोग‍प्‍लान‍उपयु्‍‍त‍अवमध‍के‍दररान‍सभी‍ काय्‍ददवसों‍म‍ें ररसेप्शन‍डेस्क‍मवकास‍मीनार,‍आई.पी.एस्टेट,‍नई‍ददल्ली-110002‍पर‍उपलब्ध‍रहगे ा। यह‍मनम्नमलमखत‍ ललक‍अथा्त्‍https://dda.org.in/hotlinks.aspx‍पर‍भी‍उपलब्‍ध‍रहगे ा।‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 495496 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] DELHI DEVELOPMENT AUTHORITY (Master Plan Section) PUBLIC NOTICE New Delhi, the 9th June, 2021 S.O. 2189(E).—The following extensive modifications which the Central Government/ Delhi Development Authority proposes to make to the Master Plan for Delhi (MPD) keeping in view the perspective for the year 2041 as Master Plan for Delhi-2041 (MPD-2041), under Section 11-A of DD Act 1957, is hereby published for public information. Any person having any objections/ suggestions with respect to the Draft MPD-2041 may send the objections/ suggestions via web portal: http://online.dda.org.in/MPD2041 or in writing to the Commissioner- cum- Secretary, Delhi Development Authority, ‘B’ Block, Vikas Sadan, New Delhi- 110023 within a period of Forty-Five (45) days from the date of issue of this notice. The person making the objections or suggestions should give his/her name, address and telephone/contact number(s)/ E-mail ID which should be readable. About MPD-2041 The Master Plan for Delhi is one of the key instruments that facilitates Delhi’s development by assessing the present condition and guiding how to achieve the desired development. The anchor agency for the master plan is the Delhi Development Authority. Implementation of the Plan is the collective responsibility of all agencies involved in the development of Delhi, including the Central Government, concerned departments of the Government of the NCT of Delhi, service providers, landowning agencies, regulators, and local bodies among others. The first Master Plan for Delhi was promulgated in 1962 under the Delhi Development Act of 1957, followed by the Master Plans of 2001 and 2021, each of which is an extensive modification of the respective previous plan document. These plans were prepared for 20 years’ perspective periods and provided a holistic framework for planned development of Delhi. The MPD-2041 is a ‘strategic’ and ‘enabling’ framework to guide future growth of the city, built upon the lessons learnt from the implementation of the previous plans. Structure of MPD 2041 document The Plan document has been structured to enable sharing in the public domain via multiple media and provide the flexibility of adding or modifying the document. Each chapter has been assigned a code for ease of cross-referencing across the document; for e.g. HCP – 1 represents the chapter titled ‘Managing public spaces better’. The Plan comprises of two volumes as given below: - Volume 1: Vision 2041 and Enabling Policy Framework comprises of an[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 497 introduction providing an overview of Delhi in present times, its global and regional positioning, estimates of population and various other projections for 2041. The Vision, Goals and Objectives of MPD-2041 are given in this Volume. Further, the volume contains six sections covering major policies of Environment, Economy (covers Trades & Commerce wholesale trade, industry and Government offices), Transport and Mobility, Heritage, Culture and Public Spaces, Shelter and Social Infrastructure and Physical Infrastructure. - Volume 2: Spatial Development Strategy and Action Plan is divided into three sections. The first section contains all major strategies and detailed provisions, specific norms for guiding future spatial development of Delhi, covering both green field and brown field development in the city (land pooling area, green development area, regeneration of planned and unplanned areas, transit-oriented development, strategic regeneration etc.). - The second section provides the Plan Monitoring and Evaluation Framework for the Master Plan with key performance indicators to monitor progress including an implementation framework for facilitating periodic review and course correction. The third section comprises of detailed development control norms and urban design guidelines for different types of development. NOTE: Any new development/ projects/ reconstruction/ addition/ alteration etc. that come up after the notification of MPD- 2041 shall follow policies and norms of the same. Any ongoing projects (under construction) at the time of notification shall be permitted as per norms of the previous plan i.e. MPD-2021. Projects yet to start construction will revise their plans as per the Master Plan in force, and will be given necessary time required for this. The following are in the public domain and public objections and suggestions have been invited. Any subsequent amendments to these will be suitably incorporated in MPD-2041.  Policy for Green Development Area  Norms for Unauthorised Colonies  Norms for parking498 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] TABLE OF CONTENTS VOLUME 1 Introduction 1. Delhi Vision 2041 (V1) Section 1: Environment 2. Addressing pollution and climate change (ENV1) 3. Enhancing Green-Blue Infrastructure (ENV2) Section 2: Economy 4. Places of economic production (ECO) Section 3: Heritage, Culture & Public Spaces 5. Managing public spaces better (HCP1) 6. Managing Delhi’s heritage (HCP2) Section 4: Shelter & Social Infrastructure 7. Strategizing Shelter (SSI1) 8. Provision of Social Infrastructure (SSI2) Section 5: Transport & Mobility 9. Improving connectivity and transport infrastructure (MOB1) 10. Shifting to shared mobility (MOB2) 11. Making Delhi walkable and cyclable (MOB3) 12. Managing parking in Delhi (MOB4) Section 6: Physical Infrastructure 13. Making Delhi water secure: water, wastewater and drainage (INF1) 14. Managing solid waste efficiently (INF2) 15. Provision of power, gas, telecom and digital infrastructure (INF3) 16. Disaster preparedness & resilience (INF4) VOLUME 2 Section 7: Spatial Development Framework 17. Development of new areas through Land Pooling (DEV1) 18. Development within Green Development Area (DEV2) 19. Urban Regeneration (DEV3) 20. Transit-oriented Development (DEV4) Section 8: Plan Monitoring and Evaluation 21. Monitoring Framework (PME)[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 499 Section 9: Development Code & Development Control Norms 22. Development Control Norms (DCN) List of Abbreviations Definitions Annexures VOLUME 1 VISION 2041 AND ENABLING POLICY FRAMEWORK INTRODUCTION The release of the Master Plan for Delhi- 2041 coincides with the 75th year of India’s Independence. India is poised to become the third largest economy in the world by 2050 and its growth trajectory is increasingly being defined by cities that contribute 60 per cent of the GDP. The Government has increased the focus on urban development by embarking upon a comprehensive programme for planned urban development in 2014, designed to bring about a transformative change in the lives of people with inclusive, participative and sustainable approach. A number of National Urban Missions have been launched by the Ministry of Housing and Urban Affairs (MoHUA). The focus areas cover almost the entire range of urban issues in Indian cities such as housing, urban services, environment and climate change, smart development, mobility, waste management, heritage, digital enabling and water security among others. In addition to this, the Government of India has come up with a number of standards, norms, model policies and frameworks that can be adopted and contextualised by cities to assess and monitor their situation in various sectors, such as, ‘Ease of Living Index’ or the ‘Climate Smart Cities Assessment Framework’. There is special thrust on urban regeneration especially of unplanned and unsafe areas and people’s health and livelihood. Delhi has always been the showcase city in India, inspiring policies and projects in towns and cities across the country. MPD-2041 is closely aligned with the national level urban policies, and will play a major role in structuring the urban narrative in the coming years. Delhi is the seed-bed of new ideas and will continue to be the beacon of growth, a face of the ‘new urban India’. Strategies of the Plan have been based on learnings from across the country with respect to implementation of various projects and schemes. Delhi’s global and regional positioning: Delhi is a globally competitive, thriving urban centre as well as a historic world city with unparalleled cultural wealth. As the500 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] capital of India, it is the seat of the National Government and at the same time functions as a union territory with a special status designated as the National Capital Territory of Delhi. The National Capital Territory of Delhi comprises of multiple local bodies that operate in separate jurisdictions. While, this unique governance structure leads to institutional complexity and challenges of multi-agency coordination, it also accords the city an unrivalled Regional, National and Global importance. Delhi is quite prominent and one of the fastest growing megacities in the world, and according to international studies, it is the second highest performer and the fastest growing economy in Asia-Pacific. Delhi is also one of the leading start-up ecosystems in the world. It is one of the most important trade centres in India and Asia and the biggest and busiest logistics and trade hub in North India. Delhi needs to build on this potential and address issues such as pollution, degraded built environment, congestion, lack of safety and disparate living conditions, which are a threat to its market potential and global attractiveness. Delhi is also considered among great historic cities of the world where buildings and monuments, including three world heritage sites and a living Walled City, which is a part of the Central Business District. Additionally, Delhi is one of the greenest cities in Asia and a river city, located on the banks of Yamuna. Delhi is well-endowed in terms of built and natural heritage, and given its unique assets, its potential as a global cultural hub needs to be explored. Delhi lies at the heart of the National Capital Region (NCR) (approx. 55,083 sq.km. in area), surrounded by four important cities from the states of Uttar Pradesh and Haryana. This urban agglomeration acts as the consumption and distribution centre for North India, accounting for 7-8% of the national GDP, with Delhi’s contribution being more than 50%. Investments in the region grew by 95% in 2019. Delhi is the key redistribution centre due to the seamless connectivity and robust infrastructure. In future, functions of distribution and re-distribution may migrate from Delhi to the upcoming dedicated freight corridors and nodes. However, Delhi will retain its economic prominence as a front for business, trade and digital logistics, and as the primary driver of the regional economy. The central NCR (CNCR) functions as a single socio-economic unit. It comprises mainly of Delhi, Gurgaon, Faridabad, Ghaziabad and Noida that demonstrate strong interdependencies with each other. Delhi Metro serves the entire CNCR and has a large share of inter-city trips and the upcoming regional rapid rail will further blur the city boundaries. With such strong connectivity, distance is no more a major factor for people in the NCR for deciding locations of work and home. Delhi needs to plan for its own future role as a city that offers a spectrum of choices for recreation, work, residence or short stay options. This can be done by developing Delhi’s unique as well as niche assets and qualities to enhance its attractiveness as a global cultural and economic hub. The NCT of Delhi is the largest city in the country in terms of area, spread across approximately 1486.5 sq.km. It comprises 367 villages, most of which are declared as urban. There are 11 districts, 33 tehsils/sub-divisions, 272 wards and five local bodies handling civic administration viz. North DMC, South DMC, East DMC, New Delhi Municipal Council and the Cantonment Board. Delhi is divided into 18 Planning Zones for ease of planning and management.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 501 Delhi’s demographic profile, population projections and development needs: Delhi is a highly preferred city in terms of employment, higher education and residence. The population of Delhi has grown at a high rate for the past seven decades. According to the Census of India, 1951-61, 1961-71, 1971-81, 1981- 1991, 1991-01 and 2001-11, NCT Delhi recorded decadal growth rates of 52.44%, 52.91%, 52.98%, 51.45%, 47.03% and 21.20%, respectively. The growth rate has dropped in the last two decades both in terms of natural growth and migration. However, in absolute numbers, NCT Delhi accounts for about 1.39% of India’s population and is one of the most populous cities in the world. Delhi is a multi-cultural, cosmopolitan city with second largest in-migration in the country. Census 2011 recorded nearly 2.26 million migrants who had been residing in Delhi for a duration of 0-9 years. However, over the last decade (2001-11), the total migration into Delhi has reduced. The Economic Survey Report (2018-19) ascertains that substantial migration was from neighbouring states and the development of Gurgaon, Faridabad, Sonipat, Noida, Ghaziabad, etc., and employment promotion programmes by respective state governments have contributed to reduction of migration to Delhi. However, the absolute number of migrants is quite high and a comprehensive understanding of their profile, purpose and duration for migration is critical to provision of housing, facilities and employment options. Delhi experienced a high surge of population right after the independence and partition of India. In addition to the original residents of the city, many families established base in Delhi and many others migrated here for government jobs and other opportunities over time. Presently, a large proportion of Delhi’s population has some roots here, comprising an entire generation that was born and brought up here. As per the Economic Survey of Delhi 2019-20, 30.3% of the population is from the age group of 15-30 years, making Delhi one of the cities with the highest young population in the world. With a high literacy rate (86.2%), Delhi also has a large educated workforce with about 1.1 million people between 15-59 years of age (2011). This highlights the need for opportunities and spaces for education, skilling and employment for youth as an imperative for talent retention and to create a skilled workforce for the city and the country. Delhi’s overall sex ratio and child sex ratio are below the national average although both have shown improvement since the last decade. While the share of population of women in the working age has increased since the last decade, the female labour participation rate is just 14.3%, five times lower than male workforce. The city has to focus on facilitating more women to join the workforce by providing safe and gender- friendly streets, public spaces and workplaces with adequate childcare facilities. It can be expected that financially independent women becoming a norm in Delhi may help improve the sex ratio, albeit indirectly. Close to 30% of Delhi’s population comprises of children and young people of 0-18 years age group indicating the need for Delhi to become a more child friendly city. Globally, holistic early development of children is considered paramount as an indicator of good quality of life, pertinent for children to grow up to be healthy and502 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] productive adults. It is thus imperative to provide infrastructure for children of all age groups and abilities in the city. Delhi is highly urbanised. More than 97% of the population was urban in 2011 as compared to 53% in 1901. Presently, most people reside and work largely in the central, eastern, southern and north to central parts of the city. In the plan period 2021-41, the western and northern periphery of the city is slated for large-scale development. The density of the population has increased from 6352 persons per sq.km. in 1991 to 11,320 persons per sq.km. in 2011. Densities vary across the city and low density pockets are juxtaposed with highly dense unplanned areas, requiring a nuanced policy for regeneration in the city. Delhi’s population in 2041 is estimated at 30.9 million, 29.1 million and 27.8 million as per the high, medium and low growth scenarios respectively, based on growth assumptions across various parameters. Accounting for the decline in rate of growth in the last two decades, the medium growth scenario (29.1 million) has been adopted as the most likely estimate. This may need recalibration when the Census is updated. Table 1 shows five-yearly growth projections: Five-year growth projections for Delhi Year Male Female Total (in million) (in million) (in million) 2021 11 9.5 20.6 (base year) 2026 12.2 10.4 22.6 2031 13.4 11.4 24.8 2036 14.6 12.3 26.9 2041 15.9 13.3 29.2 Two important shifts are likely in the demographic profile of the city. A significant increase is projected in the proportion of persons of working age (age group-25-60 years), indicating the need to create adequate employment opportunities and to harness the potential economic benefits presented by this demographic dividend. The analysis also indicates increase in the proportion of persons in the age group of 60 years and above. This, signals the need for specific provisions for the elderly in the Plan. The previous Plan had estimated that 50% of the population increase would be due to migration. The growing needs of existing population and high land values have led to the growth of unplanned settlements in the city. Migration is estimated to contribute 41% of the population increase during the present plan period, highlighting the need for introducing new housing types that cater to the needs of different income groups and tenure requirements. Baseline assessment for Delhi: In order to establish the present situation and assess gaps under various sectors, an extensive baselining exercise was conducted for MPD- 2041, involving all the relevant stakeholder agencies. Data was collated from primary and secondary sources and studies were conducted for transport,[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 503 accessibility, economy, heritage and unplanned settlements. About 200 experts contributed inputs towards different sectors and aspects of development in Delhi. All core agencies and departments of the central, state and local governments were involved in the baseline exercise. The baseline along with background studies and detailed analysis of trends and strengths, weaknesses, opportunities and threats (SWOT) brought to the fore key concerns regarding the city. These were corroborated by views received from citizens, stakeholders and experts who participated in public consultations and focussed group discussions held during plan preparation. The opinions, views and aspirations of the people of Delhi were garnered through continuous engagement during the preparation of the Plan by partnering with CSOs, RWA federations, market associations, professional bodies, public campaigns etc., as well as through direct interaction with people. Dedicated online public consultations were held from September-November 2020, including sessions with youth, persons with disabilities, professionals, NGOs working on gender issues, people living in unauthorised colonies and slums, traders, industry representatives etc. A citywide outreach was attempted through these consultations, focussed group discussions, online web portal and social media, wherein over 5000 vision statements were received from the participants. As part of the baseline, a review of the previous master plans was carried out to trace the trajectory of Delhi’s development. MPD-2021 was reviewed in detail in order to extract lessons from its implementation. The Master Plan for 2021 recognized the need to facilitate participation of private sector in the development process in order to overcome challenges associated with land acquisition and improve efficiencies of land consolidation and development. It also introduced several new principles such as pooling of land, mix-use development, transit-oriented development, etc. MPD 2041 builds upon these innovative paradigms of the previous plan and introduces relevant policies to evolve a ‘strategic’ and ‘enabling’ framework that can nurture the future growth of the city. Delhi, like most megacities of its size, has its potential and opportunities offset by issues of unsustainable urban form, degradation of built environment, mismatch between land use and transportation leading to unsustainable mobility patterns, proliferation of unplanned development, differential access to civic services across space and class, and a growth pattern that is in disharmony with the natural environment. The 2041 planning framework endeavours to address these issues in a holistic manner, build on Delhi’s inherent strengths and harness opportunities to realise the real potential of the city. Some of the key focus areas that emerged from the baselining and public consultation exercises as well as from analysis of projections for population, resource availability and economic growth, are as follows: Key focus areas for the Master Plan i. Environment: The city is quite green but these greens are inequitably distributed. The quality of greens also needs to be improved at many places. Moreover, Delhi suffers from consistently high levels of air, water and noise pollution. The Yamuna is also severely polluted. This is not only threatening the environmental assets and local biodiversity, but also the health of citizens.504 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ii. Water: Delhi is a water scarce city and yet, the resource gets wasted due to systemic losses, lack of a conservation and reuse strategy. This has serious implications on growth prospects of Delhi as well as the basic need of water for day-to-day activities. iii. Critical resources: Delhi’s consumption of power and generation of waste need to be reduced, both of which are one of the highest in the country. Existing efforts towards recycling of waste and shift to renewable energy have to be mainstreamed. iv. Mobility: There is availability of good quality public transport but the city has large number of private vehicles leading to congestion, unorganised parking, air pollution, etc. Last mile connectivity and infrastructure for walking and cycling to be provided for improving the mobility of citizens especially for persons with disabilities, the elderly and children. v. Housing: High land prices in the city have resulted in a mismatch between housing needs and housing supply. A large part of Delhi is unplanned with unauthorized colonies that fulfil the housing need by providing lesser expensive options of owned as well as rental housing. Due to poor quality construction and high built densities, these developments are unsafe. There is a requirement for different typologies and tenures of housing. vi. Built environment and public spaces: Facilities and open spaces in the city have become inadequate with steady growth in population. The existing built stock in many areas is old and dilapidated. Public spaces have to be made universally accessible and safer. Therefore, there is a requirement of regeneration as well as strategic interventions to unlock latent potential of certain areas in the city. vii. Heritage assets: Delhi is a cultural capital and has a large number of heritage assets. Preservation of assets and their adaptive reuse are to be promoted for preventing degradation and loss of historic assets and fabric. viii. Vulnerability: Delhi falls in seismic zone four and is under high risk of earthquake incidents of fire outbreaks and flooding. High built densities, poor quality and age of built stock further increases the vulnerability. The COVID-19 pandemic brought into focus the need to create self-contained and mixed-use areas with decentralised infrastructure. ix. Economic potential: Delhi has to fully realise its niche role and potential as an economic hub. Specialty health and higher education are focus areas. Cleaner production, start-ups, innovation and cyber economies have to be promoted by providing a variety of flexible and shared spaces to entrepreneurs in addition to opportunities and good working conditions. Niche sectors such as specialty health, higher education, tourism and MICE, modern logistics and specialized trade also need to be promoted. x. Monitoring and evaluation: A common database need to be established at city level with multi-agency coordination and an integrated monitoring protocol needs[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 505 to be set up. This will help monitor progress of the city and different sectors. This is imperative for the city and the Plan to enable periodic evaluation of progress and become adaptable to change and course correction. All agencies and stakeholders need to converge efforts to achieve good quality development. --- x --- x ---- x --- x --- 1.0 DELHI VISION 2041 1.1 Vision 2041 1.1.1 The vision is to “Foster a Sustainable, Liveable and Vibrant Delhi” 1.1.2 The following Goals will be pursued over the Plan period: 1.1.2.1 Goal 1 (G1): Become an environmentally sustainable city that provides a healthy environment for its citizens and is adaptable towards addressing impacts of climate change. 1.1.2.2 Goal 2 (G2): Develop a future-ready city that offers good quality, affordable and safe living environment with efficient mobility systems. 1.1.2.3 Goal 3 (G3): Emerge as a dynamic place for economic, creative and cultural development. 1.1.3 The Plan also acknowledges diversity and works towards creating an inclusive city that facilitates accessibility and opportunity for all. 1.2 Objectives for 2041 1.2.1 The Vision and Goals will be achieved through 6 objectives: 1. Prioritizing Environmental Sustainability G1 2. Facilitating Economic Development S E Delhi V 3. Enhancing Heritage, Culture & Public Life I Vision G2 T C 2041 E J 4. Improving Housing and Social Infrastructure B O 5. Moving towards Low-Carbon Mobility G3 6. Developing Resilient Physical infrastructure 1.2.1.1 Objective 1: Prioritizing Environmental Sustainability –To prioritize506 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] environmental concerns for the development of Delhi and focus on rejuvenation of natural assets, reducing pollution, greening of built environments, supporting green economies like urban farming, and creating a diverse portfolio of natural and planned open spaces. 1.2.1.2 Objective 2: Facilitating Economic Development –To promote clean economies, facilitate a unique economic role for Delhi while ensuring symbiotic linkages with NCR, improve the overall investment climate and support a variety of work and workspace typologies. 1.2.1.3 Objective 3: Enhancing Heritage, Culture and Public Life– To protect and enhance heritage and cultural fabric, build strong economic linkages and create opportunities for cultural experience, tourism and active public life. 1.2.1.4 Objective 4: Improving Housing and Social Infrastructure – To meet a variety of housing demands across different income groups and typologies, promote regeneration of older built fabric, fulfil demands for social infrastructure in dense areas of the city, and foster walkable mix- use neighbourhoods. 1.2.1.5 Objective 5: Moving Towards Low-Carbon Mobility –To encourage modal shift in favour of public and shared modes of transport, bring homes and jobs closer to mass transit, reduce vehicular congestion and provide efficient, affordable and green mobility options. 1.2.1.6 Objective 6: Developing Resilient Physical Infrastructure –To promote a sustainable approach towards use of resources like water and energy, facilitate adequate and uninterrupted services so that the city is ready in terms of digital infrastructure and resilience to shocks and disasters. 1.2.2 This forms the Enabling Policy Framework for the Master Plan. A distinct policy area is established for each of the 6 objectives for preparing development strategies. All policies, spatial development strategies and development control norms of the Master plan are designed to provide incentives/tools, regulatory provisions and guidance frameworks. 1.2.3 A summary of the key features included in MPD 41 for achieving the 6 objectives is given below: Table 1.0: Key features of MPD 2041 Group Feature Chapter reference Environment Comprehensive framework to treat green and blue assets ENV1, ENV2 (Objective 1) (natural and planned) as green-blue infrastructure to facilitate better continuum and strategies for tackling pollution Protection and enhancement of natural assets with ENV2 public interface[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 507 New city-level assets - greenways along natural drains, ENV2 repurposing underutilised sites and wastelands as green- blue assets Greening of plots/buildings and introduction to Green- Blue ENV2 Factor (GBF) for plan approval Improvement of parks and provision for special abilities ENV2 parks Dedicated Green Development Area for incentivizing ENV2, DEV2 large-scale implementation of green economies, clean energy generation and promoting green developments. Economy Incentives for setting up clean economies ECO (Objective 2) Support for conversion of strategic industrial estates and ECO District Centres into specialized clusters of knowledge, finance, services, culture or creative industries Facilitative norms for ancillary facilities like serviced ECO apartments, working women’s hostels, start-up hubs, shared workspaces, e-commerce, etc. Modernization of work centres through regeneration ECO, DEV3 incentives Promoting entry points of the city as hubs of hospitality, ECO logistics and freight, health and education hubs Support for unorganised economies including waste ECO workers, household industry, street vending, etc. Heritage, Identification of culturally significant areas in the form of HCP2 culture and heritage zones, archaeological parks and cultural precincts public life (Objective 3) Provisions for preservation, regeneration and adaptive HCP2 reuse within identified zones and cultural precincts Introduction of Heritage TDR HCP2 Implementation of active frontage, squares and plazas, HCP1 street improvement, walkable plans for public spaces and safety Shelter and Regeneration of planned and unplanned areas SSI1, DEV3 Social Promotion of rental, small format and affordable housing SSI1 Infrastructure (particularly close to mass transit) (Objective 4) Provision of, condominiums, hostels, student housing, worker SSI1 housing, etc. close to work or education centres Simplification of norms and categories for social SSI2 infrastructure allowing for new uses and needs that may emerge. Mix use, vertical mixing and multi facility plots for improving availability and access Introduction of tools like Amenities FAR and reduced norms to SSI2, DEV3 improve availability of facilities in dense areas508 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Mobility Unified institutional framework for mobility MOB1 (Objective 5) management Transit-oriented development aligned with mass transit MOB2, DEV4 Identification of strategic mobility corridors. MOB1 Focus on improving walking and cycling. MOB3 Encouraging mainstreaming electric vehicles and MOB1 other green mobility options Variable parking norms linked to availability of public MOB4 transport, earmarking space for electric vehicles, parking and parking management Multi-modal integration (including development of MOB2 multi-modal hubs) and facilitation of first and last , mile connectivity MOB3 Physical Integrated water resource management (combined INF1 infrastructure policy for water supply, wastewater management and (Objective 6) storm water management) for long term water security Rationalisation of supply norms for water INF1 Norms for decentralisation of wastewater INF1, INF2 treatment, recycling of wastes and maximum reuse of recycled water and solid waste Production and use of clean energy INF3 Provision for community level water harvesting INF1 and aquifer recharge facilities Promotion of green buildings DEV1-4 Provisions for digital and INF3 telecommunication infrastructure Disaster Management (earthquakes, fire and floods) INF4 1.3 Key directions adopted for MPD-41 1.3.1 To nurture the future growth of the city and facilitate flexibility and ease of implementation of the various policies 5 key directions have been strategized. 1.3.2 Holistic Spatial Development: The Plan provides a unified spatial development strategy with variable distribution of densities and FAR based on factors such as proximity to city centre, environmental sensitivity, access to mass transit, and strategic potential as future hubs of living, working, recreation and public life. The proposed development spectrum is given below: 1.3.3 High FAR Mid/High Density Mid FAR Mid Density Transit-oriented Development Schemes Development of new areas through land pooling Central Business District Urban Regeneration Schemes for planned[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 509 and unplanned areas Restricted Development Low FAR Low Density Areas under Environmental Protection Development within areas earmarked for Green Development 1.3.4 Strategic approach to development: The Plan identifies certain strategic growth centres/corridors where incentives such as higher FAR etc., are provided. This will help target investments to potential hubs of future growth, and minimize the stress on constrained resources like water. Implementation of transferable development rights (TDR) will further complement this approach by concentrating unutilised FAR from various parts of the city within receiving zones/corridors that are strategic and have the required infrastructure. 1.3.5 Mixed use development for optimal space/land utilisation: The Plan marks a major shift from mono-functional land use planning to mix use. A built- space based approach has evolved from land-based distribution, allowing for mixing and co-location of compatible uses across the city, including vertical mixing within buildings This will provide the required flexibility for improving availability of facilities within existing areas, thereby ensuring optimal utilisation of land. Mixed use development will also lead to reduction in trip lengths, vibrant and safer public areas. 1.3.6 Private sector participation in development: The Plan promotes private sector-led development through joint action of various stakeholders (pooling, amalgamation, joint planning and execution). This is a significant paradigm shift where development of new areas as well as regeneration of older brownfield areas shall be implemented through private initiative. 1.3.7 KPI-based plan monitoring: The Plan provides a robust monitoring framework that will facilitate tracking of larger city-level objectives through 20 key performance indicators. This shifts the focus of monitoring from creation of assets to assessment of impacts. For e.g. instead of monitoring number of STPs installed, the Plan will assess the status of pollution in water bodies. This will also enable periodic course correction to realign strategies and actions. (ref: PME) --- x --- x ---- x --- x ---[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 510 SECTION 1 ENVIRONMENT[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 511 BACKGROUND AND KEY POLICY CONCERNS Delhi has a unique environmental landscape. On one hand, it has an abundance and variety of environmental assets in the form of the river Yamuna, the Aravalli Ridge, water bodies, forests etc.; and on the other, it constantly grapples with concerns like environmental degradation and pollution. Environmental assets – green and blue The city has made rapid strides in improving the green cover, nearly doubling it in the last two decades approximately from 150 sq.km in 2001 to 300 sq.km in 2017. Presently, it is among the greenest cities in the country with a mix of natural and planned greens. Almost 20% of the land area is under green cover, as per Department of Forests, GNCTD. Based on the categorization of the Indian Forest Act, 1927, Delhi has three kinds of forests. The Ridge is a reserved forest spread over an area of about 7784 Ha that constitutes nearly 5.2% of NCT of Delhi. The Ridge is categorized as a Regional Park in the master plan, permitting very restricted development and activities. The second category is comprised of 26 protected forests, with a total area of about 1658 Ha. Thirdly, 40 unclassified forests (about 1090Ha) are maintained by Department of Forests, GNCTD as ‘City Forests’. Additionally, there are more than 18,000 parks and gardens, which enhance the green quotient of the city and take the total area constituting open and green spaces close to 30%. Realizing the need to conserve and protect biodiversity, DDA has also developed seven dedicated biodiversity parks in different areas that serve as a model for conservation of urban biodiversity. The distribution of green assets is uneven across Delhi, resulting in inequitable access in different areas. There is a need to enhance the quantum of green in certain dense areas where the per capita green is among the lowest in the country. Another area of concern is the quality of greens, as natural green areas are interspersed with invasive and alien species of trees that degrade the land; and therefore, should be replaced with native trees. Delhi is also well endowed with blue assets. The most significant among these is the River Yamuna that has a historic, cultural, and spiritual connect with the city. The city has more than 4000 natural and constructed drains, out of which, 200 natural drains are spread across three drainage basins of Najafgarh, Trans Yamuna and Barapullah. Delhi also has more than 900 water bodies in the form of lakes, ponds and tanks as per Delhi Parks and Gardens Society. However, the area under blue assets has reduced over the past decade due to encroachment, pollution and natural drying up of water bodies. Rejuvenation of blue assets is one of the key actions required in the city. Environmental pollution A major cause of concern for Delhi is the poor air quality index throughout the year. A large fraction of air pollution in Delhi comes from outside its geographic boundaries, implying that regional level action would be necessary. Indigenous (within city) PM2.5 pollution is 26% and 36% during the summer and winter, respectively, out of which 45% is because of dust (Ministry of Heavy Industries[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 512 and Public Enterprises). This highlights the need for dust management during construction activities and enhancing dense forest cover. 20% of the total air pollution in Delhi is from the transportation sector. Rest is emissions from households, waste burning, industry and diesel generator sets. Water pollution in the Yamuna and other water bodies, has resulted in disappearance of aquatic life and disturbed the water ecology. The 22 km stretch of Yamuna from Wazirabad to Okhla in Delhi, which is less than 2% of the river length, accounts for about 70% of the pollution load in the river. Despite being a perennial river, the Yamuna has no fresh water flow downstream of Wazirabad in the dry season. The flow in the river comprises of treated and untreated wastewater flowing through drains that fall into the river.24 major drains including Sahibabad, Shahdara, Indrapuri, and Tehkhand drains that are responsible for most of the polluted outflow in the river, are monitored by DPCC. The strategies for preventing pollution of the river have to consider the floodplains, as encroachment or polluting activity in the flood plains increases the ecological damage and the potential flood hazards. Noise quality levels are beyond the prescribed limit at all locations monitored by DPCC, both during the day and night. Delhi was ranked the third-noisiest city in the world in 2017 by the Worldwide Hearing Index. Air, water and noise pollution is monitored regularly at various locations across the city and a number of strategies are being adopted by the government to address pollution, which is impacting public health. A clean, healthy and flourishing natural environment will help to offset the impact of climate change, make the city resilient and provide a more liveable and sustainable habitat to residents. The legal and institutional framework for environment protection in Delhi is robust with relevant national and state laws & regulations for environment protection. A mix of strategies to be prepared for ensuring strict enforcement of regulations, addressing pollution, enhancing Delhi’s green-blue quotient in terms of quantity, quality and accessibility create an enabling environment for protecting and nurturing the rich and diverse ecological heritage of Delhi. This Section comprises of the following chapters: ENV1: Addressing Pollution and Climate Change ENV2: Enhancing Green Blue Infrastructure 2.0 ADDRESSING POLLUTION AND CLIMATE Chapter code CHANGE ENV1 2.1.1 Air and water pollution have a large geographical footprint. Multi-state efforts are required for addressing these issues comprehensively. Within the NCR, it will be critical for the member states to follow directions of the[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 513 Regional Plan and the Environment Pollution (Prevention and Control) Authority, and explore collaborative actions for addressing pollution and climate change. 2.1.2 Similarly, water pollution can be addressed by ensuring that no untreated wastewater and industrial effluents are discharged into water bodies. Concerned state governments should also maintain adequate environmental flow in river Yamuna, to reduce pollution. 2.1.3 Concerned state governments should adhere to regulations and standards prescribed by the Central Pollution Control Board (CPCB), for key sources of pollution like biomass burning, polluting industries, vehicular emission norms, brick kilns, coal-based power plants, etc. 2.1.4 Delhi needs to address internal sources of pollution and mitigate impacts on public health. The causes and mitigation measures for pollution are closely inter- related with the issue of climate change and therefore most of the strategies will provide co-benefits for both of the areas of concern. Long-term improvement in environmental parameters will require a host of complementary strategies for improving green cover, and promoting clean industries, low-carbon technologies, sustainable mobility, green buildings, etc. This chapter provides a multi-sectoral approach to facilitate: - i. Reduced air, water and noise pollution from local sources ii. Improved ability to cope with impacts of climate-related issues 2.2 Strategies for improved greening 2.2.1 Green and blue assets can absorb air, noise, water as well as soil pollution, and help in mitigating climate change impacts such as regulating rainfall patterns, reducing urban heat and flooding etc. Comprehensive strategies and actions towards improving Delhi’s green-blue infrastructure are detailed in ENV2. Further, strategies to maintain a green buffer on Delhi’s periphery and provide a regional level pollution sink, have been detailed in DEV2. 2.3 Promoting clean economic activities 2.3.1 Polluting industries as per list given at Annexure 1 shall not be permitted to operate within Delhi. The list shall be updated by GNCTD and DDA periodically, based on directives of concerned authorities. A joint action plan shall be developed by all concerned agencies to ensure that existing polluting industries in all the industrial areas are shifted or replaced with other economic activities. Non-polluting economic activities, such as service industry and clean manufacturing, shall be encouraged and incentivised as detailed in ECO. 2.4 Minimizing vehicular pollution 2.4.1 Vehicular pollution is a major contributor to both air and noise pollution in the city. Detailed strategies for reducing the number of daily vehicular trips and encouraging use of public transport and active travel modes are provided[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 514 in MOB2 and MOB3. Key strategies include: i) Adoption of mix-use and TOD for reducing the average trip lengths and bringing jobs and homes closer to transit networks. ii) Improving and encouraging public transport networks, creation of multi- modal hubs and regulatory measures such as congestion pricing etc. iii) Encouraging green mobility and active travel modes by improving pedestrian, cycling and EV infrastructure. iv) Migration to green fuels for public transport as well as IPT and other shared modes through appropriate incentives. 2.5 Other strategies 2.5.1 Pollution of surface water bodies and ground water to be addressed on priority: i) Water quality improvement to be taken up for river Yamuna, and various natural drains, lakes and baolis, by checking the outfall of untreated wastewater from surrounding developments. Concerned agencies to implement projects in this regard. ii) Steps shall be taken by DJB in coordination with the Irrigation and Flood Control Department (I&FC) to ensure time bound removal of existing pollutants using natural non-mechanized systems as per feasibility. iii) Water quality shall be monitored periodically along the entire length of drains by the Delhi Pollution Control Committee (DPCC) as per applicable procedures and protocols. 2.5.2 Unregulated dumping and disposal of solid wastes pollutes soil and water shall be regulated through the following strategies (ref: INF2). i) Dumping of solid and liquid wastes in any environmental asset of the city shall be strictly prohibited and penalised by concerned agencies. ii) Segregation of waste at source point to be adopted. iii) Local bodies shall develop a system to manage waste generated at large public gatherings and festivals held in open areas. iv) Waste reuse and recycling practices shall be mainstreamed by including such requirements as part of various development schemes. 2.5.3 45% of the indigenous PM2.5 is due to dust. The construction industry can play a major role in addressing this issue. Given that significant building construction activity is expected in the land pooling areas and as part of regeneration projects, the following provisions shall apply: i) All development projects shall follow dust mitigation measures in handling construction material and C&D waste. A Dust Management Plan shall be submitted as per CPCB or any other guidelines. Construction sites shall be monitored regularly by the local bodies to ascertain the implementation. 2.5.4 The following mitigation measures shall be adopted across the city, and implemented on a priority basis within identified pollution, flooding or heating hotspots in the city: i) Pavements, roads and roofs shall be constructed/coated with light[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 515 coloured material with high albedo value wherever possible. This can reduce local temperature by 3-5 degrees. ii) Road sections shall include appropriate trees and buffers to reduce air and noise pollution. Sustainable urban drainage components such as bioswales, rain gardens, etc., shall also be incorporated (including in residual areas below flyovers) to mitigate water logging. iii) Native species of trees and plants which act as pollution filters shall be included in the various greening initiatives. Miyawaki forests, smog absorption towers and other technological solutions may also be adopted for mitigating pollution at hotspots. iv) Higher Green Blue Factor (GBF) values i.e. higher greening requirements may be prescribed for future developments in areas identified as chronic pollution hotspots. Similarly, ground coverage may be restricted and pervious surface requirements may be increased in areas identified as flooding hotspots in the city. v) All new developments shall locate facilities like hospitals, schools, old age homes etc., away from high-speed traffic corridors. vi) A Noise Pollution Action Plan may be prepared and implemented by GNCTD based on the Noise Pollution (Regulation and Control) Rules (2000) or any other government recommended guidance framework. The number and spread of noise pollution monitoring stations in the city to be increased and appropriate noise reduction measures (plantation or noise barriers) may be implemented for immediate relief in noise hotspots. 2.5.5 A robust monitoring framework for tracking environmental parameters may be set up by DPCC. i) Data collected from such monitoring shall be regularly published through online platforms to improve awareness about these issues. Crowd sourcing of information may be explored for parameters like air pollution and noise levels, reporting on illegal dumping of solid and liquid wastes into greens and water bodies, etc.. This data can complement evidence obtained from monitoring stations and provide a granular spatial understanding of the sources of pollution and action required. 2.5.6 Citizens and other stakeholders play a critical role in managing pollution at the local level. All concerned agencies shall take steps to improve awareness, and provide adequate and reliable information to engage stakeholders as implementation partners. --- x --- x ---- x --- x ---[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 516 Chapter code 3.0 ENHANCING GREEN BLUE INFRASTRUCTURE ENV2 3.1.1 Delhi is one of the greenest cities in the country with abundant natural ‘Green Assets’ and ‘Blue Assets’ in the form of the Aravalli ridge, the Yamuna, forests, streams, drains, lakes and wetlands, as well as human-made assets like parks, maidans, ponds, baolis, etc. All green and blue assets and their inter-connected network is an essential infrastructure layer of the city that provides open spaces for citizens to enjoy and facilitate larger network benefits for biodiversity, microclimate and flood management. The master plan provides a framework for integrated management of ‘Green-Blue Infrastructure’ in the city envisaging the increase in: i) Net area under natural green-blue assets ii) Planned green spaces delivered as part of new projects in the city 3.1.2 The following four-pronged approach shall be implemented over the Plan period, combining efforts to preserve and enhance existing natural assets, create new city-level assets and increase the green-blue quotient within the built environment. This can provide the following benefits: i) Environmental – enhanced per capita greens, richer biodiversity, reduced heating and flooding, reduced pollution, improved resilience to climate change; ii) Health – cleaner living environments, active lifestyles, reduced burden of ailments and diseases (including mental health) and improved quality of life; iii) Socio-cultural – higher environmental awareness and closer connection of people with nature, availability of spaces for leisure, physical and social activity; iv) Economic – improved attractiveness as an investment destination, better productivity, reduced expenditure on health care, boost to green economies like urban farming, etc. 3.2 Preservation and improvement of natural green and blue assets 3.2.1 Many of the natural assets in the city such as the river, ridge, drains and water bodies are already notified as ‘protected’ or ‘reserved’ areas by concerned agencies. i) ‘Areas under Environmental Protection’ with delineated boundaries shall be provided by GNCTD and local bodies to DDA for the Database of Green- Blue Infrastructure detailed in Clause 3.5.1. In case of Yamuna, the delineation shall include its 1 in 25 year floodplain or any other criteria mandated by a competent authority. ii) Only restricted development shall be permitted within such sites (ref: DCN). 3.2.2 Comprehensive strategies shall be implemented for preserving and enhancing such sites.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 517 a) Boundary protection: through construction of fences or boundary walls as prescribed by concerned agencies or by providing pedestrian/cycle paths. i) Eco-friendly materials/ techniques such as earth-berming with vegetation shall be used wherever possible as an alternative to boundary walls; ii) Fences/walls shall be avoided where the boundaries are clearly demarcated by roads, bunds or natural features. b) Improving quality of assets: i) Checking growth of invasive and alien species that cause land degradation or disturb water ecology. These will be replaced with indigenous flora and fauna that require less water and/or are effective for pollution control and suitable aquatic species to restore health of water bodies. ii) Afforestation and tree transplantation may be taken up in identified areas as per feasibility; ensuring indigenous species that are compatible with the area and soil characteristics. iii) The health of all environmental assets shall be monitored from time to time and steps shall be taken by concerned agencies for keeping the assets free from pollution and addressing the shortcomings if any. iv) Enhancing biodiversity for conserving and preserving the ecosystems of Yamuna and the Aravalli Ridge. v) DJB, I&FC and other concerned agencies shall implement rejuvenation of the river and lakes in the city. DJB to ensure that adequate quantum of treated wastewater, as per prescribed quality standards, is discharged into the river to maintain the prescribed environmental flow and make treated waste water available for lake/water body rejuvenation projects. c) Enhancing people’s connection with nature: Public access to developed recreational sites shall be permitted without threatening the natural environment. i) Specific areas and trails shall be identified as ‘interactive zones’. ii) Temporary activities such as active/passive recreation, exercise/yoga, nature classes, environmental research, picnics, camping, biodiversity tours, etc. shall be permitted within these areas. Amenities like toilets, drinking water fountains, resting places, visitor information centres etc., shall be provided wherever required/feasible. iii) Public access shall not be permitted in any ecologically significant/sensitive features or areas (rocky outcrops, water bodies, nesting areas etc.). 3.2.3 Special initiative for rejuvenation of Yamuna and its floodplains: Like any river city, Delhi’s history and cultural ethos is closely linked with the Yamuna and its floodplain. The Comprehensive River Development Plan prepared and anchored by DDA shall be a multi-agency initiative that shall guide protection of the floodplain with only restricted development. i) A 300 m wide green buffer where ever feasible shall be maintained along the entire edge of the river. Wild grassing or other suitable ground-cover vegetation shall be planted for 25-30m. from the river edge and trees may be planted beyond this grass belt.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 518 ii) River-people connect shall be encouraged by developing 75-100m wide greenways along the embankments for public access with provision of cycling and walking trails and other spaces for passive activities near the river. No permanent construction shall be permitted in the floodplain. (ref: DCN) iii) Socio-cultural activities shall be permitted only in specifically earmarked locations. Specific locations may be identified for permitting agriculture in the flood plains. Any adverse impact of these activities on the river shall be minimized by proper regulation of disposal of pooja material, immersion of idols, use of fertilizers, garbage disposal, etc. Only restricted construction shall be permitted in public areas such as ghats. Regular monitoring shall be ensured by manual and CCTV surveillance to check illegal construction, dumping of sewage or malba in the floodplain and river. No untreated sewage/ wastewater outfall shall be permitted in the river (ref: INF1) iv) Eco-system restoration shall be carried out by de-silting of the existing wetlands and restoring them for catchment of floodwater and creating new wetlands by developing and deepening the existing depressions into storage basins. v) Concerned agencies shall use different methods and media to enhance public awareness about the value of Yamuna and its floodplains. 3.2.4 Preserving eco-cultural assets: Delhi has a number of historical monuments located within or in close proximity to green and blue assets. Archaeological Parks are the best examples of such eco-cultural assets. Cultural Resource Management Plans (CRMPs) to be prepared to preserve and develop such eco- cultural assets. Historical gardens, water structures (baolis, wells, tanks) etc., to be taken up for rejuvenation by concerned agencies; re-establishing lost connections with water systems and aquifers. (ref: HCP2) 3.2.5 Protecting Trees of Delhi: A Tree Directory shall be prepared by concerned agencies for their respective areas, identifying unique tree corridors or precincts, heritage trees, precincts with high carbon storage and sequestration rates, etc. Such trees/ tree clusters shall be protected and controlled in terms of planting of indigenous trees and integrated with cultural trails/ nature trails, etc. 3.2.6 Measures to reduce impact from surrounding development: The following norms shall apply to projects adjacent to Areas under Environmental Protection: i) All greenfield and regeneration projects located along drains or water bodies shall maintain a minimum mandatory buffer of 10m from the edge of the drain/ water body. A wider buffer as feasible may be mandated by the local body/DDA based on ground conditions. Landowners can consume entire FAR in the remaining plot. Compensation for providing land for buffers may be provided in case the remaining plot is rendered untenable for development after leaving the buffer. ii) Dumping of construction waste or outfall of sewage/wastewater from surrounding development shall be strictly prohibited in ‘Areas under Environmental Protection’ or their buffers.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 519 iii) Buildings shall be oriented to face the green and blue assets and maintain active facades in the form of balconies, windows, pedestrian entries, commercial or public frontages at the ground level, etc. Any mandatory public space requirements that have to be met as part of projects may be provided along the water body in the form of public promenades or parks. iv) Environmental Impact Assessment (EIA) shall be mandatory for new projects (as per prescribed guidelines) in close proximity of Areas under Environmental Protection. 3.3 Creation of new green-blue assets 3.3.1 ‘Green Development’ on the city periphery: Green Development Area policy has been proposed for green belt villages and it permits restricted development and prescribes substantial proportion of land to be maintained as wooded area and green cover. (ref: DEV2) 3.3.2 Green buffers along drains as city-level Green Corridors (ref: DCN): i) Lands shall be identified along drains that can be maintained as natural green buffers. This land can include scrub land, existing buffers or floodplains or vacant government lands in all planned and unplanned areas. Additionally, all new projects shall provide such buffers. ii) Concerned agencies shall take up creation of green mobility corridors for creating a city-wide network of green-blue assets connected through pedestrian and cycling paths developed along the drains (ref: MOB3). The water in the drains shall be cleaned and no outflow of sewage or wastewater will be permitted. In-situ treatment for improving the water quality to be adopted. iii) The natural green buffers may be developed as wetlands and marshes for water-based ecologies, through bio drainage etc., groundwater recharge points or as sponges for flood water. At places where buffers are wide, they may be designed for active public use in the form of parks, spaces for yoga, active sports (without formal seating), open air exhibitions, performances and arboretums, community gardens, boating, restaurants, etc. Heritage trails may be integrated with the green mobility corridors . 3.3.3 Repurposing underutilized sites and wastelands as green-blue assets: i) Sites such as closed landfills, ash dykes in closed thermal power plants, abandoned quarries and mines have issues of toxicity, unstable nature of soil, etc. These sites may be converted into biodiversity parks, eco-parks, water bodies, etc., as per feasibility. ii) Circular economy strategies like processing/recycling of legacy wastes at landfills, repurposing and adaptive reuse of industrial structures artefacts may be adopted by concerned agencies. 3.3.4 Other initiatives: i) Provision of planned greens: In land pooling areas, existing plantations, wetlands, low-lying areas shall be included for development of public parks and aquifer recharge ponds in order to retain the drainage pattern.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 520 Public greens shall also be contributed mandatorily by Regeneration and TOD Schemes as prescribed by the Plan.Vertical mixing of uses shall be encouraged within buildings so that more land can be opened up for parks and open areas. (ref: DCN) ii) Provision of active recreation and sports facilities: Sports facilities are required to be provisioned at accessible locations that are well connected to public transport and networks of walking and cycling. New sports facilities such as stadiums, district sports complexes, playgrounds, multi-purpose grounds etc. shall be created to encourage healthy living and active lifestyle among residents as well as provide infrastructure to enhance capabilities of sports persons for active participation in national and international competitive sports including Paralympics. iii) Special greening projects: Special projects such as biodiversity parks, amusement parks, children’s adventure grounds, nurseries, etc., shall be taken up by all concerned agencies to provide multiple options of recreation for residents. iv) Recharging Aquifers: DDA and DJB shall undertake projects to facilitate groundwater recharge in critical zones by creating artificial water bodies utilising treated waste water. v) All-abilities parks: All-abilities parks shall be created across the city by earmarking land or retrofitting existing parks. These parks have to be designed for play and recreational activities especially catering to the needs of people with disability, elderly, toddlers and infants with caregivers. 3.4 Enhancing green-blue features in the built fabric 3.4.1 Existing local level parks and other planned greens shall be improved by local bodies/DDA or by RWAs/MTAs (Market Traders Association), community etc., through the following interventions: a) Water sensitive urban design i) Storm water drainage shall be integrated within the landscaping and design of parks so that they may act as rainwater harvesting sumps. ii) Impervious paved surfaces shall be replaced with semi-pervious paving material allowing groundwater recharge and reduction in local heating. iii) In larger parks (community level and above), decentralised wastewater treatment facilities for the area/locality may be integrated into the landscape design and the treated water may be used for horticultural purposes or ground water recharging lakes. Dedicated space may also be provided for composting. b) Improving functionality of parks i) Dedicated tree plantation strategy shall be developed by DDA/local[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 521 bodies for larger parks (community level and above) or a cluster of parks for mitigating air and noise pollution, reducing heat, creating comfortable micro-climate and providing shaded areas for recreation etc. ii) Activities like eateries, libraries/reading areas, outdoor performances, exhibitions, yoga and meditation, adventure trails for children etc., may be permitted in a regulated manner in larger parks. (ref: DCN). 3.4.2 Greening of public areas: i) All concerned agencies including DDA and local bodies shall ensure greening of streets RoW 18m and above. Such streets may be developed by creating avenue plantation of appropriate shade-giving, evergreen trees and landscaped areas for seating, green plazas, bio- swales along drains etc., to create a comfortable microclimate. Bridges and FOBs may also incorporate green elements on pillars, roofs, parapet etc. Such greening shall be taken up on a priority basis in areas where Walk Plans are being implemented (ref: MOB3). ii) All surface parking sites shall have 80% of the area as pervious or with pervious paving. Trees shall also be planted at regular intervals in such sites wherever feasible. iii) Respective agencies shall take up landscaping and plantation in residual spaces under flyovers, land along water pipelines, unpaved road sections etc. Some of these may be used by public if feasible. 3.4.3 Encouraging greening: Activities such as urban farming, community gardens, etc., may be encouraged in vacant private/public lands irrespective of land use of the plot. Z-farming/vertical farming shall also be a permitted activity within all use premises. Local bodies and DDA may also provide suitable guidelines and capacity building to communities/ RWAs/ schools/ other stakeholders for undertaking such activities. Mandatory wild grassing of all government owned vacant lands shall also be enforced. 3.4.4 Green-Blue Factor for buildings and sites: Green rating shall be mandatory for new developments as per UBBL to reduce energy consumption from mechanical heating/cooling and mitigate pollution. Additionally, development of green-blue features within plots/buildings in the form of roof gardens, terrace gardens, green walls, landscaped and/or pervious ground, etc. shall be encouraged in all development projects. i) A Green Blue Factor (GBF) shall be applicable on all new projects and developments. It is computed by combining the prescribed weightage of specific green and blue features provided in the site and building design. ii) Incentives and disincentives may be provided by local bodies for achieving a minimum GBF and for applying it on existing buildings. iii) All new projects and developments shall have to achieve a minimum value of the GBF as prescribed by the Plan. iv) Computation of GBF shall be done at plot level and shall be integrated as a condition for all building and layout sanctions. 3.5 Management of green-blue infrastructure[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 522 3.5.1 A Database of Green-Blue Infrastructure as part of the Delhi Spatial Information System by all the concerned agencies shall be maintained and mapping the existing and potential sites. i) The database shall be based on the typological classification of green and blue assets given at Annexure 2 and shall be made available to the public through the DDA website ii) Information such as hydrology, topography, associated biodiversity, etc. may also be added over time to develop a rich resource for research and future planning. The Tree Directory may also be integrated into the database. iii) A data-sharing protocol shall be set up to ensure that all concerned agencies provide data on a real-time basis or periodically to the database to keep it relevant and updated (e.g. building and scheme sanctions with GBF and public greens, afforestation, creation of new parks etc.). The data would help set baselines, plan and track new initiatives and assess the change in quantum and quality of green-blue assets. 3.5.2 Protection and enhancement of green-blue assets is a priority of the Plan. It is recommended that concerned agencies set aside own resources and explore other innovative funding mechanisms for carrying out greening initiatives. A dedicated Green Fund may also be created for this purpose. 3.5.3 Citizens and stakeholder groups shall be facilitated by concerned agencies to play a role in the protection and improvement of green-blue assets and develop community ownership and responsibility towards these shared resources and urban commons. --- x --- x ---- x --- x ---[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 523 SECTION 2 ECONOMY BACKGROUND AND KEY POLICY CONCERNS Delhi is one of the fastest growing urban centres of the world. It is the sixth largest contributor to the national GDP (7.1%) with a GDP growth rate that is 4% higher than the national average. Delhi serves as the economic core of the National Capital Region, contributing to more than 50% of the GDP of the region. The city is the region’s largest commercial centre with strong linkages to national and global financial networks. It has emerged as a leading start-up ecosystem with high literacy levels (86.2%), a young population (average age is expected to be approx. 35 years in 2041) and a sizeable proportion of the population of working age (total working population was 6.28 million in 2017-18 and is expected to grow to 10.7 million in 2040-41). Additionally, across all indices of tech literacy and access, creativity, ability to attract talent and average education levels, Delhi is ranked the highest among all states and UTs (MPI report). This indicates the need to foster innovation and create employment opportunities to harness the economic potential presented by this demographic dividend. Delhi has retail, wholesale and warehousing hubs spread across the city. Being the country’s capital, is a seat of government and quasi-government institutions, where headquarters of various national/multinational companies are located. It is a premier MICE, travel and hospitality business destination. The city also has a huge cultural capital that can be leveraged for promoting cultural (tourism, travel, F&B, etc.) and creative (media, design, arts, etc.) industries. It has also hosted mega events like the Asian Games (1982) and Commonwealth Games (2010) Delhi also serves as a major industrial centre with 33 planned industrial estates, four flatted factory clusters, 1.75 lakh MSMEs (more than 90% micro enterprises) and 23 notified non-conforming industrial clusters. These industries along with household industries continue to generate employment for both skilled and unskilled workforce. The scale of industry has undergone fragmentation and a large proportion of the workforce is employed in small and micro enterprises and household industries. Over the past two decades, Delhi has experienced a shift towards the tertiary sector. Close to 83% of Delhi’s income is from the tertiary sector and about 15% is from the secondary sector (NSS 2015- 16, PLFS (Periodic Labour Force Survey) 2017-18). Given the rising concerns regarding pollution, shift towards cleaner economies such as IT/ITES, knowledge-based and hi-tech industries, entrepreneurial activities, realty markets, tourism, hospitality, logistics, transport, communication, tertiary healthcare and higher education is envisaged. The IT industry, in particular, is expected to grow and receive policy support. Policies for economic development may be directed towards supporting small and micro enterprises and unorganized economies that provide employment, while ensuring migration towards cleaner, non-polluting economies. The construction sector can expect to triple its workforce by 2041 due to implementation of Land pooling and other development policies. The TOD policy and strong regional interdependencies will also[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 524 generate employment in the transport, trade and retail sector. Many erstwhile industrial spaces are undergoing a transformation into clusters of clean, service, knowledge, finance, and entertainment-oriented functions. This has blurred the boundaries between the commercial and industrial uses, and there is a need to facilitate diversification and modernisation of such mono-functional areas. Technological innovations like app-based services, warehouse-to-home models; remote working/ work- from-home, etc. are changing the nature and form of work spaces and associated requirements. The demand for co-working spaces is set to treble in the next 3 years and demand for large enterprises is expected to grow over medium to long-term. Improved digital and telecom infrastructure will promote growth of newer and niche economies and increase the share of data-enabled technologies in Delhi’s GDP. Shifting of wholesale and warehousing activities from the city centre to outskirts is an important concern for Delhi to reduce freight-linked congestion within the city. While some of these involving hazardous substances have shifted, other activities still continue to operate. The informal sector is the largest employer in the city engaging approximately 70% of Delhi’s workforce. There is a need to improve the quality of workspaces and opportunities for the sector. Within the informal economy, female work participation has increased. Due consideration towards provision of space for public conveniences, individual and group work as well as childcare etc., should be made. Initiatives by the state government and concerned agencies will be required to ensure upskilling of workforce over the plan period to create better opportunities for the informal workforce for incremental absorption into emerging formal economies. The chapter formulates strategies for upgrading the existing spaces of economic production, i.e. trade and commerce, wholesale, industry, service and informal sector, developing new economic hubs that facilitate the shift towards cleaner and niche economies and enabling improved access to economic opportunities: ECO: Places of Economic Production Chapter code 4.0 PLACES OF ECONOMIC PRODUCTION ECO 4.1.1 The Master Plan provides an enabling environment for harnessing the economic potential of Delhi and facilitating a variety of work and workspace typologies so that opportunities are created for public at large. It aims to facilitate balanced economic growth by supporting both formal and informal economies (inclusive economy), fostering non-polluting and environmentally-friendly economies (clean economy), and promoting economies that will help to establish a unique role for the city in the regional context (niche economy). 4.1.2 Strategies of the plan will facilitate the following: i) Creation of strategic hubs of high investment and high value business and services ii) Optimized utilization of existing economic centres iii) Migration of non-conforming economic activities to approved sites and/or uses[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 525 iv) Improved facilities for the informal sector 4.2 Approach for development and strengthening of economic centres 4.2.1 Promoting clean economies: The Plan focuses on improving existing core economic sectors, namely retail trade, wholesale and warehousing, logistics, manufacturing, government offices, banking and finance, shifting to clean economy and facilitating existing polluting industries to shift. i. Knowledge and cyber economy: Cyber economy, high-tech robotics and electronics, knowledge and innovation, research and development, etc. ii. MICE (Meetings, Incentives, Conferences and Exhibitions), Cultural and creative economy: World class centres for MICE travel and hospitality, etc. tourism, design and fashion, publishing, F&B, media, visual/performing arts, etc. iii. Health and Education: Tertiary healthcare, medical research and development, bio-tech, pharma research, higher education, etc. iv. Green economy: Urban farming, horticulture, solar farms, theme parks, etc. v. Circular economy: recycling and repair economy, wastewater reuse, recycled C&D waste products (like fly ash bricks, reclaimed asphalt pavement etc.), recycling of faecal sludge, recycling of e-waste, plastic waste, etc. 4.2.2 Fostering Strategic Economic Hubs: Strategic areas shall be developed as city level economic hubs. Holistic planning for improved public transport access, pedestrian connectivity and creation of public spaces shall be undertaken. a) TOD Nodes Areas around identified transit stations shall be developed as high-intensity mix- use nodes and may be developed as high-tech, logistics, hospitality, health and education clusters to cater to regional dependence on Delhi for various facilities. b) Business Promotion Districts i) Identified existing Industrial Areas, District Centres and Institutional Areas or any other area with high potential for economic growth shall be notified by DDA to be developed as Business Promotion Districts (BPDs) having functions such as cyber hubs, clean-tech innovation clusters, media and design clusters, medi-cities, edu-cities, MICE hubs, modern logistics hubs, etc. ii) BPD shall have minimum planning area of 10 ha. and shall be developed as per the provisions of Regeneration Schemes. c) Green Development Area (GDA) GDA shall be developed as a hub for green economy as per the provisions of the Green Development Scheme. 4.2.3 Diversifying mono-functional economic centres and regeneration: The plan will promote diversification of economic centres to accommodate the shift towards cleaner, tertiary sector economies and create thriving mixed-use employment destinations in the city. This would include supportive functions such as hospitality, working women’s and men’s hostels, rental housing and serviced apartments, spaces for leisure and entertainment, public spaces, etc.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 526 4.2.4 Existing economic centres shall also be upgraded through regeneration and improvements in transit access, public space, quality of physical and digital infrastructure. 4.2.5 Facilitating New forms of Workspaces: A finer network of decentralized workspaces in the form of small warehousing for e-commerce, co-working spaces for start-up economy, etc. shall be facilitated. Additionally, the Plan will promote emerging new forms of work such as platform and gig economies. through creation of supporting amenities for the workers. 4.2.6 Fostering Night Time Economy (NTE): i) The concept of ‘24-hour city’ is being promoted through Model Shops and Establishments (Regulation of Employment and Conditions of Services) Act 2015 as well as the NTE policy at the national level. ii) Nodes, precincts or circuits shall be identified for continuing work, cultural activity and entertainment at night to attract tourists and locals. iii) This will improve economic yield by extending the utilisation of work spaces, and safety in the city by promoting a vibrant night life. 4.2.7 Supporting the Informal Sector: The Plan provides adequate space norms and facilities for supporting informal economies. 4.3 Trade and Commerce 4.3.1 Metropolitan City Centre (MCC)/ Central Business District (CBD): Areas such as Connaught Place and its Extension, commercial areas in the Walled City and Karol Bagh have historically played the role of the CBD and continue to have high concentration of commerce, offices, businesses and socio-cultural facilities. The CBD area is constituted of different areas, each with unique built character, concentration of specialised activities and potential for future growth. 4.3.1.1 An area-based improvement approach shall be adopted for revitalizing the commercial core of the city. i) Connaught Place (CP) & CP Extension are iconic hubs characterized by heritage and landmark buildings, and a diverse mix of office, hospitality, entertainment, retail and business activities. An integrated improvement plan shall be prepared for improving the heritage buildings and public realm. Size of plots as per existing layout plan shall be maintained and no sub-division shall be permissible. ii) Mandi House has emerged as a socio-cultural hub with socio-cultural institutions, educational institutions, government offices, State Bhawans, etc. The institutional character of the area should be maintained and enhanced. iii) Pragati Maidan has assumed international and national significance due to its capacity to serve as a major exhibition and expo-centre. With the ongoing redevelopment of the area, it is expected to emerge as a MICE Hub. Adequate provisions for temporary accommodation, hospitality, parking and public spaces should be ensured in the area.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 527 iv) Indraprastha Estate is a vibrant hub of government offices and institutions. The area shall be maintained and promoted as an Institutional Hub. A comprehensive improvement plan should be prepared to address traffic congestion, enhance public realm and manage parking. v) Shahjahanabad (Walled City) is a Heritage Zone with concentration of large number of heritage buildings. Wholesale activities shall be shifted and cultural/retail activities shall be promoted in the area. All improvements and regeneration shall be taken up as per the provisions of HCP2 and DEV3. vi) Areas outside the Walled City include areas like Paharganj, Sadar Bazaar, Azad Market, Bara Hindu Rao, etc. A Regeneration Plan shall be prepared for these areas. Specific economic activities such as hospitality districts, alternate sites for warehousing and wholesale, etc. may be planned. Any traditional bazaars or other areas of cultural value shall be identified and protected as part of the plan. vii) Karol Bagh has a mix of plotted residential areas as well as commercial areas. An integrated improvement plan shall be prepared for delineating areas where the plotted character needs to be protected and those where regeneration schemes may be permitted. 4.3.1.2 Comprehensive traffic and parking management plans, plans for improving walkability and creating cycling circuits, and encouraging NTE (Night Time Economy) shall be prepared and implemented. 4.3.1.3 Built-to-edge frontage should be framed as part of the comprehensive improvement plan of the area and implemented wherever feasible. 4.3.2 Hierarchy of Planned Commercial Areas The Hierarchy of developed planned commercial areas are as follows: i) District Centres (DCs) have been planned as sub-CBDs to provide a wide range of financial services, retail, office, entertainment, IT/ITES, hospitality, shared and, and related uses. DCs located in proximity of public transit stations may be taken up for development as TOD Nodes . ii) Community Centres (CCs) provide for retail and leisure shopping, essential business establishments, office spaces, theatres, etc. and cater to the needs of the population at community level. iii) Local Shopping Centres (LSCs) and Community Shopping Centres (CSCs) include retail stores and personal service establishments which cater to frequently recurring needs. Such establishments are required in convenient locations near all residential areas and are provided as a part of gross residential use. iv) In land pooling areas, the development of commercial areas shall be as per the specific provisions of DEV1. 4.3.3 Pre-1962 Commercial Areas: Residential areas and streets/stretches declared as commercial areas/streets prior to the notification of MPD-1962 or where commercial use was allowed in MPD-1962 shall continue such use to the extent[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 528 permissible in MPD-1962. Commercial activities existing from prior to 1962 in residential areas are also permitted subject to documentary evidence. Areas developed prior to 1962 that were not included in the Master Plan for Delhi (subject to documentary proof) having concentration of commercial activities, may continue as mixed use as per DCN. Such areas may also undertake regenerations per provisions of DEV3. 4.3.4 Other Commercial Centres: Other commercial centers includes notified Non- hierarchical Commercial Centre (NHCC), Shop-cum Residence Complexes (shop- cum-residence plots/ shop plots) later designated as CC/LSC/CSC and other existing shop-cum-residence plots. These areas shall be governed as per norms and regeneration to be as per DEV3. 4.3.5 Commercial Streets/ Mixed Use Streets: No new notifications shall be permitted as Mixed-Use Streets or Commercial Streets. Non-residential uses within residential areas shall be permitted as per provisions given in DCN. Local bodies/MTAs shall prepare plans for improving traffic management, parking and public spaces along existing streets. Streets below 9m RoW shall be considered by local bodies for pedestrianisation. 4.3.6 Service markets: To support low turnover, and space extensive shops for fruits and vegetables, service and repair, junk and scrap materials (kabari), hardware and building materials, automobile repair workshops, etc., all economic centres may reserve space for such facilities. as prescribed in DCN. 4.4 Hospitality 4.4.1 Delhi is emerging as an international centre of education, health care, tourism & leisure, sports and business, which require hotel facilities including Budget Hotels, guest houses, lodging and boarding houses, dharamshalas, hotels and serviced apartments catering to various economic groups. 4.4.2 The following shall be permitted: 4.4.2.1 Dharamshala, Budget Hotels, Guest houses, B&Bs, boarding lodging facilities shall be permitted as part of mixed use in residential areas. 4.4.2.2 Hotels/ serviced apartments are permitted as part of: i) socio-cultural facilities such as convention centres, socio cultural centres, etc., ii) commercial centres in Industrial and Wholesale Use Zones, and iii) transport nodes (ISBTs, bus depots/terminals, multi-modal hubs, railway stations, airport, integrated freight complexes). 4.4.2.3 Hotels may also be developed through use conversion of plots with access from 30m RoW in industrial and wholesale use zones. The maximum ground coverage and FAR in such cases shall be as per the applicable norms/ sanctioned building plans, but in no case exceeding the permissible ground coverage and FAR of that use zone. 4.5 Wholesale Trade 4.5.1 Delhi is the biggest consumption centre in North India. It has also attained the status of a major distribution centre by virtue of its geographical location. With[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 529 digital advancement, e-commerce has emerged as an important segment requiring new forms of warehousing services. The upcoming regional freight infrastructure like DFC and DMIC is also likely to reduce Delhi’s primacy as a distribution centre and result in transformations in existing forms of wholesale trade and warehousing. 4.5.2 Existing wholesale markets and IFCs shall be permitted to undertake regeneration as per provisions of DEV3. This will facilitate modernisation and capacity enhancement for meeting future requirements. 4.5.3 Wholesale and warehousing requirements for Land Pooling areas and GDA shall be met within IFCs. Mandis, storage and cold storage shall be permitted to develop within the GDA as per specific norms(ref: DEV2). 4.5.4 Warehouses on plots of 1 ha and above with direct access from 30m RoW shall be permitted to have retail activity as per DCN to facilitate development of big box retail. 4.5.5 IFCs shall include warehousing, godowns and wholesale units and other activities after providing operational requirements for freight and logistics. 4.5.6 Conversion of industrial plots to warehouses shall be permitted within industrial use zones as per DCN 4.5.7 All warehousing activities and wholesale storage within the old city shall be shifted to compatible areas such as industrial areas, IFCs or wholesale markets within a period of 10years. Concerned local bodies/ GNCTD may introduce incentive schemes for facilitating such relocation. 4.5.8 Regeneration of areas in close proximity to the old city such as Sadar Bazaar shall be permitted uses such as warehousing and hotels to cater to the requirements of the old city businesses. 4.5.9 Unplanned/ Non-conforming godown clusters: Several unplanned clusters of godowns/warehousing have developed across Delhi. Regularisation and planned regeneration of such areas shall be as per DEV3 and shall be completed within a period of 5 years. Clusters that do not participate shall be mandatorily shifted to identified industrial areas, IFCs or wholesale markets. 4.6 Industry 4.6.1 A list of existing planned industrial areas in Delhi is given at Annexure 3. Regeneration such areas shall be as per provisions given in DEV3. Such existing areas may also be taken up for area improvement by DSIIDC/local industry associations for parking, public realm, greening and development of common facilities such as CETPs. 4.6.2 Conversion to group housing, , PSP, commercial and warehousing use shall be permitted as per specific provisions given in DCN. Conversion to knowledge- based industries and vocational education centres shall be permitted to facilitate synergies between industry and academia. New forms of big box retail shall also be facilitated.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 530 4.6.3 In order to facilitate start-ups and innovation clusters in industrial areas, co- working spaces shall be permitted on industrial plots up to 10% of the FAR. without any use conversion. 4.6.4 New industrial areas (proposed for development by DSIIDC and/or developed in land pooling areas) shall be developed as hubs of clean industry such as business parks, tech parks and cyber hubs, knowledge, R&D, cultural industry/media clusters. 4.6.5 Industries listed under prohibited category shall not be permitted in Delhi as given in Annexure 1. Any existing industrial units under prohibited category will need to shift outside Delhi or shift to clean manufacturing/production within a period of 5 years. 4.6.6 No industrial activity (including household industries) shall be permitted within Bungalow Zones (New Delhi & Civil Lines), the Ridge, River Bed (Zone-O), areas along water bodies, canals, sensitive areas from security point of view, reserved / protected forests, Cooperative Group Housing Societies, DDA housing, Group Housing excluding Janta flats, Government flats / bungalows / employer housing, etc. 4.6.7 Pre-1962 Industrial Areas: Industrial Areas, existing prior to 1962 or where industrial use was allowed in MPD-1962, shall continue to the extent permissible in MPD-1962, subject to documentary evidence. Any regeneration of such areas shall be as per the provisions of DEV3. 4.6.8 Household industries: Household industries shall be allowed to operate from residential premises as per provisions of DCN. A list of permitted household industries is given at Annexure 4 and 5. 4.6.9 Unplanned/ Non-conforming Industrial areas: Several unplanned industrial areas have developed across Delhi. Regularisation and planned regeneration of such areas shall be as per DEV3 and shall be completed within a period of 5 years. Clusters that do not participate shall be mandatorily shifted to identified areas. 4.7 Government Offices 4.7.1 Government of India, GNCTD and local bodies have their offices in Delhi. Most of the offices and court complexes were setup immediately after Independence and have not fully utilised the land assets. This sector will continue to be a major economy and employment generator for the city. 4.7.2 Optimum utilization of existing government land shall be achieved through regeneration as per provisions of DEV3. This will facilitate the development of modern multi-storey office complexes with adequate facilities such as employee housing, commercial facilities, etc. 4.7.3 In the land pooling areas, as far as possible, the government offices and court complexes shall be developed as integrated office complexes and located along MRTS corridors.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 531 4.7.4 Government office clusters and court complexes shall also be permitted within commercial and industrial areas. TOD projects may provide such facilities within the commercial component and as part of over station development thereby providing better mass transit connectivity. 4.7.5 Areas with government offices and court complexes shall be treated as a priority ATA (Active Travel Areas) (ref MOB3). Wherever feasible, provision of stack parking shall be provided. 4.8 Informal economy 4.8.1 Informal sector units locate themselves near commercial/industrial areas, wholesale, warehousing, PSP facilities, offices and transport hubs providing critical support services. The following provisions shall apply: i) Vending zones for accommodating informal sector units shall be provided by various plots/layouts as per provisions of DCN. The provision of such units shall be ensured at the time of sanction of building plans / layout plans. ii) Wherever feasible, clustering of informal activities shall be promoted and facilitated through appropriate infrastructure. Such clusters can be temporary like weekly markets or take more permanent forms such as teh- bazaari systems or theme-based Haats. Local bodies shall identify suitable sites for such clusters. iii) Street improvements as well as development of new streets shall incorporate multi-utility zones as per Street Design Regulations for accommodating informal activities. The vending and no vending zones shall be clearly demarcated in plans prepared for identified Active Travel Areas (ref: MOB3). iv) All designated spaces for vending shall be provided with public conveniences (including separate toilets for men and women, changing rooms, childcare facilities) and solid waste disposal arrangements. 4.8.2 Multi-use community work centres/ work spaces shall be provided as part of regeneration or improvement of unauthorized colonies, urban villages and slums, as per feasibility. (ref: DEV3) x x x x[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 532 SECTION 3 HERITAGE, CULTURE AND PUBLIC SPACES BACKGROUND AND KEY POLICY CONCERNS Built Heritage: Delhi is one of the oldest inhabited cities in the world, and has been the site of numerous settlements over its history. There are large number of heritage assets and areas of concentrations having world heritage value and a unique palimpsest where culture and heritage integrate with public activity. Delhi has world heritage sites, Centrally Protected Monuments, State Protected Monuments and other local listed heritage and non-listed heritage assets. Some of these heritage buildings and remains of national importance have been lost and are now untraceable. Heritage buildings notified by local bodies are mostly privately- owned and in active use by the occupants. Many of these are under severe threat due to disrepair, incompatible use and insensitive reconstruction of full/part asset. There is an urgent need for conservation and monitoring of all heritage assets. Delhi’s built heritage is largely concentrated in Zones A, C, D and F in the triangle formed between the Yamuna and the Ridge. A number of these have the potential to become unique cultural hubs for the city. Many of these are interlinked with natural assets like water bodies and forests, presenting opportunities for integrated planning. Today many of these historic areas have dense settlements and commercial activities, and face issues of encroachment with neglected heritage assets. with mixed use pattern Heritage areas like Shahjahanabad, Nizamuddin, Mehrauli, Tughlaqabad, Jahanpanah, Hauz Khas and Lutyen’s Delhi contain some of the most important icons of Delhi’s. Delhi has to formulate strategies to utilise this strong cultural capital for boosting economy and fostering unique cultural and public spaces through instruments such as adaptive re-use. Although a number of boutique establishments, artist studios and other creative economies have located close to such sites in some urban villages, and initiatives such as art and cultural festivals, food walks, heritage walks etc. have emerged, but all these activities are sporadic in nature rather than being linked to enhancement of tourism and heritage experience in a systematic way. In addition to[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 533 heritage assets, Delhi also comprises of landmark buildings (defunct industrial sites / power plants). There is need to acknowledge such assets as modern and industrial heritage of the city and bring them under the purview of conservation and cultural promotion. Public spaces in Delhi: The city is dotted with a number of public spaces of cultural, social and economic significance. These are in the form of activity nodes and networks adding to a vibrant public life in Delhi. The public space typology of Delhi is very diverse, ranging from iconic city level hubs, parks and open spaces like India Gate, Central Park at CP and Nehru Park to large social and cultural facilities, traditional/historic bazaars of the walled city, theme sites like Dilli Haats, markets like Janpath street, emporia area on Parliament street, and local parks, chowks and streets. Apart from these, various spaces for creative arts such as Mandi House, water bodies, Yamuna floodplains and areas with concentration of heritage assets themselves form important elements of the cultural and public life of the city. There is a need to enhance the public realm to make all public spaces and places safer, more inclusive and vibrant for all users especially for people with disability, pregnant women, elderly and children. There is also a need to create a public space inventory for Delhi to identify (i)landmarks, iconic places and visual corridors that contribute towards the city’s identity for enhancement of public experience and, (ii) areas/ streets for improvement and installation of facilities for people’s convenience. This section sets out strategies for conserving and leveraging the city’s heritage and those for enhancing the public realm of the city in the following two chapters: HCP1 – Managing Public Spaces Better HCP2 – Managing Delhi’s Heritage Chapter code 5.0 MANAGING PUBLIC SPACES BETTER HCP1 5.1.1 The Plan aims to significantly address issues of safety, encroachment and lack of infrastructure associated with public spaces to foster a vibrant public realm in the city. This will provide numerous benefits across all three goals of the Plan with better walkability, public life, social cohesion, health, creativity and boost local businesses, retail, cultural economies. 5.1.2 The term ‘public realm’ is regarded as an essential urban common, comprising of shared public areas in a city that belong to everyone and are accessible to all. This Plan envisages the following with particular focus on three elements, viz. streets, public and private plazas/squares, parks and open spaces: i) Improved availability and experience of well-designed, safe and well- maintained public spaces across the city[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 534 ii) Improved interface between buildings and public areas with enhanced street-level activity and safety 5.2 Fostering city level hubs and networks for public life 5.2.1 An important strategy for improving public life in the city is to foster large, iconic public areas and landmarks that are a part of the image of the city. While the Plan identifies some new opportunities that can be created, many such areas already exist in the city and will need to be improved through better facilities and design for supporting a variety of public activity. 5.2.2 City Hubs: The following typologies of city-level hubs shall be developed/improved on priority basis: i) Public waterfronts: The Plan gives provisions for undertaking eco- sensitive rejuvenation of the Yamuna floodplains and strategies for creating greenways along buffers of drains. This will encourage sensitively designed new public spaces alongside water bodies in areas that were previously neglected. (ref: ENV 2; MOB 3) ii) Urban woodlands: Delhi has large area under reserved and protected forest areas, that can offer excellent places for citizens to lead an active lifestyle and connect with nature. Respective land-owning agencies shall identify and develop ‘interactive zones’ for providing access to a variety of flora, fauna and natural environment. Reclaiming sites such as quarries, landfills, ash dykes, etc., as parks and natural habitats shall also be carried out continuously during the Plan period (ref: ENV 2). iii) Cultural hotspots: Cultural hotspots such as Shahjahanabad, the Central Vista and India Gate lawns, Connaught Place, Hauz Khas, Mehrauli, etc. are places of intense public activity, attracting locals as well as tourists. Other specific hubs with a concentration of socio- cultural activities shall be identified (e.g. Mandi House, Lodhi Institutional Area and Art precinct, Dilli Haat, Dastakaar Haats, etc.). Efforts shall be made to improve the public realm in and around such sites. iv) Transit hotspots: World over iconic airports and transit stations have formed an important part of public memory and public life of cities. The Plan has provisions for development of transit nodes as hubs of mix use and public activity and for creation of such imageable landmarks. (ref: MOB2 and DEV4) v) Market places: People associate with many of Delhi’s diverse markets for special products and experiences. These markets including District Centres and Community Centres can become Active Travel Districts with pedestrianised stretches for enhanced shopping experience. (ref: MOB3) vi) Recreation hubs: Development of various green entertainment hubs, performance and concert spaces, weekend destinations, theme parks, etc., is anticipated in the Green Development Area, which will add to the inventory of city-level public spaces. (ref: DEV2) 5.2.3 City level circuits: Public space networks form an important strategy for[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 535 fostering a safe and vibrant public realm. The Plan identifies numerous opportunities in Delhi for creating green corridors, heritage and cultural circuits or even temporary festival circuits. An indicative list of potential circuits is given in Annexure 6. Such circuits shall be taken up for improvement of public facilities for walking, resting and social interaction, for facilitating cultural and/or creative economies and themed events, etc. (ref: HCP2; MOB 3) 5.2.4 Nightlife Circuits (NCs): Night time economies (NTE) and an active night life are important for improving safety, reducing congestion by staggering activities, utilising spaces for different activities optimally, and improving productivity for formal as well as informal economic activities. i) Streets or areas such as cultural precincts, areas with concentration of heritage assets, areas in the Central Business District, etc. that have a vibrant nightlife presently shall be priority nodes of Nightlife Circuits (NCs). ii) Local bodies, Tourism Department and other concerned agencies shall identify NCs and permit extended timing for hotels, restaurants, socio- cultural activities, entertainment, sports facilities, retail stores etc., to function in the night as per stipulations. iii) Concerned agencies shall work jointly in identified NCs to facilitate adequate illumination, security and easy access by public transport. Special metro lines and bus routes may be permitted to operate at low frequency during night time. iv) All new constructions/redevelopments along identified NCs shall be incentivized to create active frontages. v) Concerned agencies can collaborate with artists’ collectives, cultural groups, resident’s groups, youth groups, market and vendors associations and weekly markets etc., to organize seasonal or cultural festivals, themed night walks, etc.to promote NCs. 5.2.5 Innovative mechanisms of financing public space improvements through advertising, short-term leasing of public spaces, use of CSR funds, etc., may be explored by concerned agencies. 5.3 Improving local public spaces 5.3.1 Public life on streets: Streets occupy approximately 20 percent of the total land in Delhi and are the most ubiquitous form of public space in the city. The Plan focuses on leveraging this potential and reclaiming streets as places for people i) Walkability shall be facilitated across the city providing barrier-free environment with adequate street infrastructure, shading, and public conveniences as per the Street Design Regulations in Annexure 7. ii) Public life on streets shall be further improved by creating opportunities like street vending zones, accessibility to all types of users, pedestrian crossings and public plazas as per Clause 5.3.2. 5.3.2 Public Plazas: Plazas range from neighbourhood chowks and nukkads to institutional forecourts, city squares and piazzas, and form important pause points along movement networks.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 536 5.3.2.1 Plazas of the following types shall be encouraged in the city: i) Standalone plazas– These can be in the form of forecourts of buildings, and may be on-ground as well as elevated levels. ii) Corner plazas along streets – These may be developed at the intersection of streets. The plot edges or building edges may be chamfered or inverted or recessed creating corner plazas for spill over of commercial/institutional uses. iii) Mid-street plazas – These may be created by recessing plot lines or building edges along a street, particularly in front of public buildings. 5.3.2.2 Plazas shall be planned as part of layout plans in all greenfield and brownfield layouts/schemes as per prescribed norms for different types of development. 5.3.2.3 In case plot area is provided for development of public plazas, FAR for such area shall be permitted to be utilized in the remaining plot. 5.3.2.4 Plazas shall be provided as part of all transit station projects at ground, concourse or other elevated levels to facilitate public movement and act as spill over areas. 5.3.2.5 Public Plazas shall remain un-gated and open to general public at all times. 5.3.3 Activity programming: Appropriate programming through activity-generating uses plays a vital role in ensuring vibrant and safe public areas with eyes on the street. Stronger relationships between public areas and surrounding buildings shall be promoted through the following: 5.3.3.1 Norms for flexible mix of uses and vertical mixing as proposed in the Plan, promote a mix of activities within plots/buildings resulting in areas remaining active for longer periods during the day. Public uses such as libraries, book stores, retail, post offices, etc., to be mandatorily placed on lower floors with easy access from the street. 5.3.3.2 Active Frontage: A certain percentage of active frontages in the form of arcades, colonnades, shopfronts, pedestrian entries/ exits, plazas, access points, transparent shop windows etc., shall be maintained along roads with RoW of 18m or more as part of regeneration projects (ref: DEV3). In greenfield areas such active frontage shall at least be maintained along 24m. streets. Buildings along such edges shall be built-to-edge as per applicable norms. In places where boundary walls are permitted, care should be taken to maintain visual connectivity with the street (Annexure 7). 5.3.3.3 MUZs, subways and public/private plazas shall be programmed with kiosks, informal vending, public art, performance etc. Attractive play elements, water features, street furniture, charging points, reading corners, etc. can greatly enhance the quality of public spaces by providing pause spaces along movement corridors. 5.3.4 Local parks: A hierarchy of parks, greens and open spaces for meeting different types and scales of needs shall be implemented in greenfield, as well[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 537 as brownfield areas. Multi-use of grounds within schools or other public institutions as community parks after school hours may also be encouraged. 5.3.5 Privately-owned public spaces (POPS): The Plan promotes development of POPS that shall remain private property and be maintained by the owner/developer, but provide open public access during regulated hours at ground or elevated levels within buildings. i) Such spaces shall be considered free of FAR. Developers shall be permitted to locate activity generating uses around such areas but no kiosks or commercial use shall be permitted within the designated public area. ii) Such spaces shall be over and above the commercial spill over spaces or private open spaces created by developers for commercial use. This shall also not compensate for any open space requirements that have to be mandatorily provided by landowners/ developers. 5.4 Other interventions for improving public spaces 5.4.1 Provisions of fire safety shall be ensured in all public spaces and evacuation areas shall be identified by concerned authority in proximity of all congregation spaces and public buildings to be used in the event of any disaster. 5.4.2 Public Art: Temporary public art installations and street performances shall be encouraged in public spaces. Residual spaces such as subway crossings and space under flyovers may be activated through such interventions, ensuring that users are not inconvenienced. The guidelines on Public Art Policy as prepared by DUAC to be followed. 5.4.3 Citizens and other stakeholders can play a major role in public space management through initiatives such as conducting regular audits of public areas in terms of accessibility, safety and illumination, needs of specific user groups, etc., and sharing these with concerned agencies. Concerned agencies may also gather public opinions by integrating public space user surveys as part of the active travel and other smart applications. --- x --- x ---- x --- x --- Chapter code 6.0 MANAGING DELHI’S HERITAGE HCP2 6.1.1 ‘Heritage’ comprises tangible elements (monuments, buildings, streets, gardens, etc.) as well as intangible ones (festivals, traditional craft products, art forms, etc.) of historical and associated cultural value. The Plan adopts a holistic approach and envisages improvement of heritage assets as well as cultural hubs in the following manner: i) Conservation and/or adaptive reuse of heritage assets.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 538 ii) Provision of infrastructure, quality of life and economic vitality in historic areas. 6.2 Conservation of heritage assets 6.2.1 Location of all heritage assets that are maintained by respective agencies, shall be integrated with the GIS- based Delhi Spatial Information System. The list of the heritage assets shall be updated every 5 years in order to assess their condition and take the necessary steps towards conservation. 6.2.2 Conservation and management of national and state protected monuments, buildings and any development within the regulated and prohibited areas shall be as per relevant Acts/laws. Comprehensive Cultural Resource Management Plan of each area /site including infrastructure upgradation, visitor amenities etc. shall be prepared and implemented in consultation with the local community. 6.2.3 The Authority may identify any other buildings/clusters of heritage/cultural value including old markets, pre-1962 structures, isolated premises such as school adjoining Jama Masjid, Presentation Covent School, Church at Kashmere Gate, municipal offices at old Hindu College complex etc., where additions/ alterations shall be within the overall frame of conservation on a case to case basis. 6.2.4 Owners of heritage buildings that are listed by local bodies can avail the following incentives to ensure conservation and sensitive use/reuse of such assets: i) Alterations shall be permitted in these buildings, based on the grade of the building. ii) Adaptive Reuse of structures shall be permitted as per Clause 6.2.4. iii) Incentive FAR shall be offered as per Clause 6.2.5. Enabling provisions by local bodies and concerned agencies as per Clause 6.2.6. 6.2.5 Adaptive Reuse: Heritage buildings identified by the local bodies are mostly privately-owned and in active use by the occupants. In such buildings, the constituent owners shall be encouraged to conserve such buildings and make adaptive use/ reuse of such assets in conformity with the historic context. Introduction of any new compatible use/s shall be permitted within heritage buildings as notified by local bodies for which separate Regulations shall be formulated. i) In heritage buildings where adaptive re-use is being planned, the provisions of UBBL may not be insisted upon for measurements as these buildings and structures have already been built. ii) Construction of temporary structures for activities such as informal markets, food courts, cultural events, etc. shall be permitted in open areas within the site, subject to permission from local bodies and Delhi Fire Services wherever applicable. 6.2.6 Heritage TDR: Owners of heritage buildings notified by local bodies shall be[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 539 compensated for loss of development rights. The unutilised FAR shall be calculated using the permissible FAR on the respective land use. Owners shall also be eligible to an incentive FAR of 20 for preservation and upkeep of the heritage property retaining its original heritage character and fabric. i) The total FAR (unutilised and incentive) shall be awarded in the form of TDR (transferable development rights) that can be utilized in identified TDR Receiving Areas (ref: DCN). ii) The TDR Certificate shall be issued by DDA; only after due repairs and improvement of the property have been made and relevant certification obtained from concerned agencies. iii) Local bodies/concerned agency shall levy penalty in case of failure to meet committed repairs and maintenance or in case of damage to heritage value of the building. 6.2.7 Other enabling provisions: i) Local bodies may set up Heritage Cells that will manage heritage assets, monitor status of their upkeep, delineate cultural precincts, promote complementary economic/ cultural activities, conduct festivals, walks etc., facilitate adaptive reuse projects and set up a Heritage Fund to support these initiatives. Such a Heritage Cell may identify other landmark modern and industrial heritage buildings/part buildings/sites ii) Concerned agencies shall facilitate owners of heritage properties to undertake conservation of their heritage structures. A portal shall be developed by each agency with information of list of heritage structures, empanelled technical experts with expertise in heritage buildings, artists, executing agencies, information on projects being taken up, identified potential investors etc. iii) Concerned agencies shall also implement programs for education and sensitization and support initiatives such as heritage walks to be undertaken by local bodies / concerned agency. iv) CSR Funding may be promoted to adopt /conserve and manage the Heritage assets. 6.3 Heritage and cultural clusters in the city 6.3.1 Three types of heritage/ cultural clusters are identified in the city, i) Heritage Zones: Heritage Zone is an area, which has significant concentration, linkage or continuity of buildings, structures, groups or complexes, united historically or aesthetically by plan or physical development etc. The following areas are identified as Heritage Zones: a) Walled City of Shahjahanabad b) Lutyen’s Bungalow Zone (LBZ) Annexure 8 as listed should be part of Heritage ii) Cultural Precincts: A Cultural Precinct represents a concentration of fragmented heritage, both tangible and intangible with architectural, historical, cultural and associational values within a defined area connected to each other by streets and cohesive built form. Such precincts may be separate or part of Heritage Zones. Annexure 8 is the indicative list of cultural precincts.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 540 iii) Archaeological Parks: Archaeological Park is an area distinguishable by heritage resource and land related to such resource, which has potential to become an interpretative and educational resource for public in addition to value as a tourist attraction. Archaeological Parks shall be defined based on evaluation of the pertinent aspects like form, design, materials and substance, use and functions, tradition and techniques, location and setting, spirit and feeling and other internal and external factors attraction. The designated Archaeological Parks in Delhi are: a) Mehrauli Archaeological Park b) Tughlaquabad Archaeological Park c) Sultan Garhi Archaeological Park d) Indraprastha Archaeological Park e) Northern Ridge Archaeological Park The above list is indicative and more Heritage Zones, Cultural Precincts, Archaeological Parks may be added by concerned agencies. 6.4 Strategies for heritage zones and cultural precincts 6.4.1 Shahjahanabad as a cultural enterprise hub: The walled city is the historical core and business centre of the city, rich in both tangible and intangible heritage. The World Heritage site of Red Fort is located here besides numerous notified heritage assets. Its unique fabric comprises of katras, bazaars, historical markets, streets and vistas as well as intangible cultural experiences like festivals, poetry, traditional craft products, cuisine, and textiles, etc. that are unique to Delhi. However, the area faces numerous challenges such as continued wholesaling, warehousing and polluting/hazardous economic activities, and traffic congestion due to movement of goods, dilapidation of buildings, lack of infrastructure and ad-hoc and insensitive transformations leading to disruptions in the built fabric. A multi-agency coordinated initiative shall be taken up for revitalization of the area during the Plan period: i) All Cultural Precincts within the walled city shall be delineated within 2 years. SRDC/concerned local body shall prepare and implement plans for all such precincts as per Clause 6.4.3. Support may be provided to owners of heritage buildings to undertake conservation / adaptive reuse as per Clauses 6.2.3-6.2.6. ii) The local body shall prepare a plan for the area identifying all major markets, commercial and mixed-use streets. All noxious industries and hazardous trades, godowns and wholesale activity generating freight movement shall be removed from the zone and shifted to designated areas in the city within a period of 10 years. Old markets such as Lajpat Rai market shall be retained as prescribed in previous plans. Existing activities may continue in the form of retail. The clustering and agglomeration of inter-connected retail activity associated with old city and as identified by local body shall be promoted. iii) To encourage the development of the area as a cultural enterprise hub, uses such as artist studios, performance spaces, museums, libraries,[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 541 cafes, music venues, co-working spaces, craft centres, hotels, B&B facilities shall be permitted in plots with access from minimum 6m road, irrespective of applicable land use. (ref: DEV3) iv) The fine grain fabric and street morphology of Shahjahanabad is critical to its character and shall be retained. Henceforth, group housing typology and stilt parking shall not be permitted. However, reconstitution of larger areas (such as at sub-zone level) shall be permitted for purposes of integrated area improvement and regeneration. All regeneration within the walled city shall be as per the specific development and urban design controls provided. (ref: DCN) v) Walled City is a node for night life circuits in the city. (ref: HCP1) vi) The local body and other concerned agencies shall facilitate/ implement the following area improvement initiatives. a) A traffic management plan shall be implemented for the walled city, identifying vehicular thoroughfares, pedestrianized areas and streets, NMT routes, limits and timings for service vehicles, common parking areas for residents and tourists, and commuter dispersal plans around metro stations that serve the walled city. b) Active travel shall be promoted in the area and it shall be a priority ATD providing facilities for walking, cycling, PBS etc. (ref: MOB3). c) No more open spaces in the walled city shall be taken up for creation of MLCPs as a large number of metro stations are closely located in the area. Any existing surface public parking sites shall be maintained as pervious areas. All statutory clearances shall be obtained. d) Area level plans for katras, bazaars etc., shall be prepared in consultation with residents and stakeholders for identifying common public areas to be used for evacuation during emergencies as well as need- based provision of socio-cultural facilities and installation or improvement of services and utilities. e) Decluttering of overhead wires that increase the risk of fires shall be remedied through appropriate technological solutions (ref: INF4). 6.4.2 Lutyen’s Bungalow Zone: This area comprises of the seat of the central government including important assets like Rashtrapati Bhawan, Parliament House, India Gate, Supreme Court, Delhi High Court, North and South Block, Cabinet Secretariat, Prime Minister’s Office, offices of various central ministries, museums, art galleries and bungalows that serve as government residences. LBZ has its own unique character with wide tree lined avenues, Central Vista, roundabouts, big private and public gardens, and significant examples of colonial architecture. i) Development-oriented norms shall be formulated by the concerned agency for regeneration of the LBZ without compromising on its heritage value and aesthetic character. 6.4.3 Provisions for Cultural Precincts: The following provisions shall apply: i) Delineation of boundaries for listed Cultural Precincts (on the basis of principles formulated for this purpose) shall be carried out by the local body and shall be delineated in the Zonal Plans.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 542 ii) Cultural Resource Management Plan (CRMP) shall be prepared by local body/concerned agency for each precinct, incorporating urban design and built form controls. Wherever feasible, active frontage at the ground level shall be encouraged along the main streets of the precincts. Socio- cultural activities shall be promoted within the precincts. iii) The streets and street networks that form a part of the precincts shall be treated as priority ATDs for street improvement and development of facilities such as PBS and NMV. iv) Green Corridors along natural drains that connect different heritage assets or precincts shall be developed as eco-cultural corridors with adequate amenities for tourists. v) Heritage trails/walks shall be encouraged in the Precincts. Such trails may be integrated with Nightlife Circuits and cultural festivals to increase their vitality. (ref: HCP1) 6.4.4 Provisions for Archaeological Parks: CRMP shall be prepared, emphasising conservation of built heritage amidst the natural heritage. The Plan shall identify all potential resources such as historic structures, gardens, orchards, open water bodies, step wells, baolis etc. and provide specific urban design controls required for sensitive development of the site. i) Archaeological Parks have the potential to become tourist hubs with passive leisure activities. The natural historic ambience of these sites shall be preserved by sensitive landscape design ii) Restaurants/ cafes, libraries, kiosks, interpretation/exhibition/training centres, tourist information centres, souvenir stores and public conveniences shall be permitted as per norms. iii) Adaptive reuse of structures as identified in the CRMP may be taken up as per feasibility. iv) Temporary structures constructed with eco-friendly material may be permitted for a limited period (subject to clearances) for hosting festivals, events, farmers’ markets, exhibitions, etc. Temporary public art and installations shall also be encouraged. --- x --- x ---- x --- x ---[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 543 SECTION 4 SHELTER AND SOCIAL INFRASTRUCTURE BACKGROUND AND KEY POLICY CONCERNS Housing: The development of land and housing in Delhi has largely been the prerogative of the public sector, with limited private participation. Such processes have not kept pace with the growing demand for housing. The high cost of land in the city has also resulted in making housing unaffordable. As per Socio-Economic Survey of Delhi, GNCTD, 2018- 19, 85% population requires affordable housing options. This mismatch has resulted in proliferation of unauthorised colonies (UCs) and slums, and densification of existing urban villages to accommodate such housing needs. Some of the area in the city have been developed without provision of proper infrastructure catering to a large population. As per Census 2011, almost 10.8% of the population lived in slums occupying 0.5% of the city’s total area. Such areas suffer from poor quality of built stock, inadequate services, lack of amenities and open spaces, and lack of proper access even for disaster mitigation putting them at high risk in case of fires, earthquakes& other calamities. In order to improve these areas, the Government has initiated the process of providing land rights to residents of identified UCs, through the National Capital Territory of Delhi (Recognition of Property Rights of Residents in Unauthorized Colonies) Act, 2019. Approach is to focus on improvement in the overall quality of life, as well as that of the housing stock. For improvement of slums, in situ slum rehabilitation schemes shall be implemented, thereby reducing threat of evictions. In addition to the compromised structural quality, the housing stock is also congested, with more than 60% households (household size of 5) occupying one-room or two-room dwelling units. This hampers productivity, overall well-being and social relationships of family members. Housing demand estimations have taken this into consideration. Around 28.4% of households live in rental accommodation (Census, 2011) and it is estimated that the number would have increased over the last decade. 32.3% of the population are migrants (Socio-Economic Survey of Delhi, GNCTD, 2018-19) and prefer rental housing due to low entry and exit costs. Most of this rental housing demand is being catered by unplanned settlements, with issues of tenure insecurity and compromised living conditions. There is a need to address the housing needs of students, single working men and women, migrants, etc. through affordable housing, rental housing, hostels, studio apartments, serviced apartments, dormitories, etc. The NCT of Delhi has a sizeable portion of housing stock (both public and private) which is unoccupied and/or unsold. 11% of the Census Houses (including houses used as residence and residence-cum-other-uses) in Delhi are vacant (Census, 2011). There is a potential to bring such stock back into circulation through rental options.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 544 Delhi is well connected to the NCR region, and regional housing developments especially in the affordable housing segment will continue to complement Delhi’s shelter needs, given the differences in cost of land. This inter-dependency needs to be factored into the strategies for determining the tenure options and typologies for housing development in Delhi. Based on the Census 2011 data, the housing demand for Delhi (2011-2041) is estimated to be 34.5 lakh dwelling units, assuming an average household size of 4.5 persons. The housing demand has been calculated by considering factors such as housing backlog, new demand generated due to increase in population, homeless population level of congestion in the existing dwelling units, the condition of the existing stock (obsolescence) that would need replacement and the availability of the vacant housing stock in the city. It should be noted that this does not take into the account any changes in housing stock post-2011 due to lack of data. The projections will therefore have to be recalibrated during subsequent plan reviews by taking into account the data available through Census 2021. Social Infrastructure: Delhi has a robust infrastructure serving the health, education, safety and security and socio-cultural needs of its residents as well as the region, with facilities both at the district/ zonal/ sub-zonal level and at the neighbourhood level. This section sets out strategies for improving provision of housing and social infrastructure in the following chapters: SSI1: Strategizing shelter SSI2: Provision of social infrastructure Chapter code 7.0 STRATEGIZING SHELTER SSI1 7.1.1 The Plan provides a comprehensive framework for meeting the projected housing requirements over the Plan period. It facilitates both improvement in existing housing stock as well as creation of new housing inventory through regeneration of existing areas and planned development of greenfield sites. It also addresses the challenges and specific requirements of unplanned areas in the city. 7.1.2 Strategies of the plan will facilitate the following: i) Improved availability of housing options by providing affordable rental housing, etc. ii) Enhanced built environment, safety and quality of life in old and unplanned areas[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 545 7.2 Overall approach for improving housing supply 7.2.1 Future housing supply in Delhi shall be met through: i) large scale development of sectors in the greenfield areas of the city using the model of land pooling. Identified land pooling areas have the potential to develop 17-20 lakh dwelling units;(ref: DEV1) ii) development of low density and low FAR residential areas within the Green Development Area (ref: DEV2). iii) regeneration of existing areas, both in terms of improvement of existing stock and creation of new units through densification (ref: DEV3). iv) utilisation of increased permissible residential FAR (residential FAR has doubled since MPD-62) as part of reconstruction of plots will also contribute substantially. 7.2.2 A paradigm shift is envisaged in the supply scenario, with the private sector leading the development/redevelopment of housing over the plan period. Public agencies shall play the role of a ‘facilitator’ and ensure ease of doing business, through appropriate regulatory environment. 7.2.3 All housing areas shall be developed as complete neighbourhoods with requisite local facilities within walking distance. Such facilities shall be provided as part of Residential layout. 7.2.4 In order to address the housing needs of the migrant population across all income groups, rental and affordable housing shall be promoted within the city, particularly in areas closer to transit. Public projects for TOD or large-scale regeneration may especially focus on creating such affordable rental housing options. Incentives shall also be offered for encouraging the private sector to provide rental housing. 7.2.5 Given the limited availability of land, housing supply shall be maximized by ensuring the development of small format housing of 40-60 sq.m. 7.3 Housing in new development areas 7.3.1 Development in the land pooling areas provides opportunities for creating multiple housing typologies. Development of rental housing (including affordable rental housing) shall be promoted. At the sector level, 25% of the net residential FAR shall be utilised for creating small-format housing. 7.3.2 On Low Density Residential Plots (LDRP), residential typology of low density residential dwelling units, retirement homes, assisted living for elderly and those with special needs, etc., shall be permitted. 7.4 Regeneration of existing planned residential areas 7.4.1 Regeneration will enable optimal utilisation of urban land to create new housing, and also to improve the quality of housing and transform each area into self- sustained resilient neighbourhoods with equitable access to civic amenities and recreational spaces.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 546 7.4.2 For all planned residential areas, other than government-owned housing and slum rehabilitation schemes, regeneration would primarily be a private sector- led initiative. Amalgamation of plots and FAR-linked incentives shall be permitted. 7.4.3 Group housing shall be preferable as part of regeneration schemes and such projects shall provide affordable housing as per MPD provisions. 7.5 Regeneration of existing unplanned residential areas 7.5.1 Unauthorised Colonies (UCs): Regeneration of UCs shall be as per the provisions of DEV3. Settlement-level improvements will be required to make all parts of the settlement accessible for emergency vehicles like ambulances and fire tenders. i) Appropriate incentives and relaxations in norms shall be provided for facilitating amalgamation and joint regeneration of areas. ii) Given that the residential density in these areas is high, therefore, amenity FAR as an incentive may be provided for creation of facilities as per Urban regeneration norms. 7.5.2 Concerned agencies and landowners shall ensure protection of their lands within land pooling areas, GDA and other vacant lands in the city to prevent further growth of UCs and unauthorised construction activity of any kind. 7.5.3 Urban Villages: have emerged as islands of unplanned growth in the city. They have similar issues to UCs and have emerged as major hubs of rental housing. Many of the urban villages are also of heritage importance and will need a mix of regeneration and conservation strategies. Specific regulations for development and regeneration of urban villages shall be formulated by DDA within 2 years of notification of this plan. 7.6 Housing for urban poor 7.6.1 Slums/JJ clusters on tenable sites shall be improved through in-situ slum rehabilitation or area improvement schemes. Relocation shall be considered only in case the underlying site is untenable. 7.6.2 Resettlement colonies: Resettlement colonies are facing issues of accessibility, lack of adequate services and poor quality of construction and dilapidation. These colonies shall be taken up for regeneration as per the provisions of DEV 3. 7.7 Promoting rental housing 7.7.1 Metropolitan cities across the world maintain a diversified rental housing stock providing residents and migrants tenure flexibility, geographical mobility and affordability (low entry and exit cost). Given the high cost of land in developed parts of the city this also ensures availability of housing for a variety of income[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 547 groups closer to their workplaces, thereby minimizing trips distances. 7.7.2 Public agencies shall develop a proportion of their housing inventories in the form of rental housing. This may be of various forms such as service apartments, dormitories, etc. A mix of rental options such as affordable rentals with controlled rents, market rental units, rent-to-own models may be explored. Public agencies may also consider bringing their unsold/vacant public housing stock into the rental market to ensure utilization of such assets. 7.7.3 Affordable Public Rental Housing (APRH): DDA and other concerned public agencies may take up dedicated APRH projects on public lands close to activity centres (industrial areas, educational hubs, etc.) to improve the availability of affordable rental stock. 7.7.4 The large number of EWS housing units created as part of group housing projects provide opportunities to improve the availability of affordable rental housing stock. Suitable models may be explored for facilitating the same. Employer Housing projects of government agencies may be exempted from provision of EWS housing after approval of competent authority. 7.7.5 In order to improve management of such rental assets, public agencies may seek the services of Rental Management Agencies and housing aggregators. An online portal giving information regarding availability, location, rentals, etc. shall be created. 7.7.6 Incentives shall also be offered for encouraging the private sector to implement rental housing or other non-ownership formats like serviced apartments, worker housing, etc. as follows: i) Industrial areas and warehousing/freight complexes shall develop affordable rental housing units by utilising 15% additional FAR. ii) Rented housing shall be promoted as part of Group housing projects. iii) Rental housing shall be permitted and encouraged in all greenfield, reconstruction and regeneration projects in the city. 7.7.7 Enabling environment for rental housing shall be further improved by revision of prevailing rental acts/laws/rules. x x x x Chapter code 8.0 PROVISION OF SOCIAL INFRASTRUCTURE SSI2 8.1.1 Social infrastructure covers a wide range of public and semi-public (PSP) facilities including health, education, socio-cultural facilities, safety and security infrastructure, communications, distributive facilities and other functions. Planning, development and delivery of social infrastructure is done through multiple service providing agencies. The Plan provides a framework for enhancing the adequacy and accessibility of high-quality social infrastructure that caters to the needs of all stakeholders.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 548 8.1.2 Strategies of the plan will facilitate: i) Improved availability and accessibility of social infrastructure ii) Increased flexibility to introduce new uses/functions as per changing needs 8.2 Key strategies for improving availability of social infrastructure 8.2.1 Optimal use of available land/space for social infrastructure: i) Flexibility is provided to develop social facilities as part of built-up area through vertical mixing. This will help to create facilities in areas where adequate land is not available. ii) Local level facility plots shall be treated as ‘multi-facility plots’ that can be utilised for co-location of compatible facilities as per requirements. Such plots shall be allowed enhanced FAR to accommodate multiple uses. iii) PSP sites shall be permitted to use a part of the FAR for supporting uses. This will facilitate better utilization of available community facilities such as multipurpose halls, socio cultural centres etc. This strategy will ensure adequate provision of facilities, thereby improving quality of life and facilitating decentralised, self-sufficient areas. 8.2.2 Protection and enhancement of existing facilities i) Regeneration schemes shall be permitted to include facility plots within the scheme area to facilitate improvement of facilities. The DE will have to provide for equal or more facilities as per norms in the new design. ii) Redundant/ underutilized/ unused social infrastructure plots shall be permitted to migrate to other PSP uses. This will ensure that limited PSP land resources are fully utilised. 8.2.3 Ensuring facilities for all 8.2.3.1 Facilities for children, women, elderly, people with special abilities and families from economically weaker background are to be provided as per DCN. 8.2.3.2 All new facilities and public conveniences shall be developed/ designed to ensure accessibility and ease of use. Existing facilities may be retrofitted to ensure the same. 8.2.3.3 PSP facilities shall also be created in inadequately served unplanned areas through: i) Reduced norms for plot area, setbacks etc. /built-up area for essential social infrastructure like primary health and education. ii) Amenities FAR shall be provided over and above the permissible FAR of regeneration scheme for unplanned areas. Such FAR shall be mandatorily utilised for developing essential facilities. 8.3 Hierarchy of Social infrastructure 8.3.1 The Plan provides for the following population linked hierarchy of social infrastructure i) Local level: Facilities catering to the day-to-day needs of the local population, shall be adequately distributed at 10,000 population. ii) Community level: Community level social infrastructure shall serve a[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 549 population up to 1 lakh. iii) Sub-city level: Larger level facilities which shall serve population up to 5 lakh and shall be distributed at sub-city level. iv) City level: City level social infrastructure shall cater to the city as well as the region. 8.4 Types of Social Infrastructure and Facilities 8.4.1 Healthcare 8.4.1.1 Emerging needs in healthcare services shall be addressed by provision of adequate facilities as follows: i) General, specialty healthcare, alternative medicine and para medical service. ii) Care facilities for elderly, persons with disabilities and for people with special needs, facilities for physical and mental healthcare, de- addiction centres/ drug-rehabilitation centres, after-care centres etc. iii) Clusters of tertiary healthcare and related R&D facilities 8.4.2 Education 8.4.2.1 A two-pronged approach is adopted for development of education facilities: i) Ensure availability/ access to school-level education in all areas; ii) Integration of higher education with skill development of opportunities for employment, emerging economic sectors and industry requirements; iii) Enhance availability of education and training facilities for children and persons with disabilities or special needs as per provisions of the Rights of Persons with Disabilities Act, 2016; iv) Give special emphasis to provision of early learning and child-care facilities to ensure holistic development of infants and toddlers and provide support to families and working women. 8.4.2.2 All new schools in Delhi shall be integrated (i.e. from pre-primary to higher secondary level) and all-inclusive (with respect to the requirements of children with special needs). Schools for children with special needs may be permitted as a standalone facility. 8.4.2.3 Clusters of higher education and knowledge industry that are emerging as important economic sectors for Delhi shall be promoted within industrial areas, BPDs and TODs. 8.4.3 Socio-cultural facilities 8.4.3.1 In order to reinforce Delhi’s prominence as a cultural hub, the Plan proposes to create new destinations (convention/ interpretation centres, theatres, museums, etc.) as well as experiences (cultural precincts, economic hubs, etc.). 8.4.3.2 Such city level socio-cultural uses will be permitted as part of archaeological parks, and green buffers along natural drains. Large format performance spaces and convention facilities shall also be permitted in the Green Development Area.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 550 8.4.3.3 Local level socio-cultural facilities shall be strengthened to serve diverse needs such as those of senior citizens, youth, families, etc. Multi-purpose spaces will accommodate the local needs for skill development centres/ training centres/ gathering spaces/ libraries/ child-care facilities, etc. 8.4.4 Safety and Security Infrastructure 8.4.4.1 Ensuring law and order and safety against crimes and accidents as well as emergency services is the responsibility of multiple agencies such as Delhi Fire Services, Delhi Police, Delhi Traffic Police and Delhi Disaster Management Authority. Such facilities need to be appropriately distributed across the city, accordingly decentralisation of such facilities at local and sub-city/ city levels is recommended. 8.4.4.2 Training facilities/security camps, parade grounds, etc. that require larger areas are also proposed as part of city level infrastructure. 8.4.5 Postal and Telecommunication facilities 8.4.5.1 The Post and Telecommunication infrastructure has transformed extensively over the last two decades. The concerned departments/ agencies shall assess the current utilization of allocated land/ built space and explore possibilities for better utilisation of land. 8.4.6 Distributive facilities 8.4.6.1 Facilities like milk, fruit, vegetable are day-to-day requirements at local level. In addition, the PDS facilities/ fair price shops may be provided in close proximity. 8.4.6.2 Sub-city and city level facilities for supply of PNG, LPG, and other fuels etc., used for domestic purpose, shall be permitted in compatible use zones. 8.4.7 Cremation-Burial- Cemetery facilities: 8.4.7.1 Provision of facilities under this category is based on the needs of different faith groups. The Plan encourages adoption of innovative approaches for making such facilities more eco-sensitive (gas-fired/ electric/ green, cremation facilities) and provides appropriate space for accommodating the same. Burial grounds for animals to be located separately. 8.4.8 Public Conveniences 8.4.8.1 Public conveniences shall be developed as prescribed in UBBL and as per provisions of Advisory on Public and Community Toilets issued by Central Government (2018). Such facilities shall be sensitive to the needs of children, women, elderly and persons with special abilities and also accommodate child care facilities. 8.4.8.2 Public conveniences shall be permissible in all use zones and shall also be improved as part of improvements in street infrastructure. 8.4.9 Other Community facilities 8.4.9.1 Other community facilities such as religious facilities, care centres, old-age homes, orphanages, women homes, corrective/ remedial facilities, juvenile homes, observation centres, detention facilities, etc shall be provided as per plan.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 551 x x x x SECTION 5 TRANSPORT AND MOBILITY BACKGROUND AND KEY POLICY CONCERNS Delhi is the core of the NCR with strong regional interdependencies with the surrounding towns (Gurgaon, Noida, Greater Noida, Ghaziabad and Faridabad) in terms of housing, employment, higher education and health facilities, and other goods & services. This leads to large-scale regional movement of people and goods on a daily basis, resulting in severe stress on existing transport infrastructure of the city. New developments in adjoining urban centres and upcoming regional infrastructure in the form of Integrated Freight Complexes (IFCs), International Airport at Jewar, industrial corridors like Delhi Mumbai Industrial Corridor(Western) and Amritsar Kolkata(Eastern), Dedicated Freight Corridors etc., will significantly impact the commuter and freight movement patterns and these need to be factored into the transport strategies for the city. The inception of the metro has brought the CNCR towns closer. However, despite the metro playing a significant role in transporting people within the CNCR, roads providing regional connectivity within Delhi indicate high levels of congestion, high traffic flow, and excessive delay and queuing on roads. According to the Delhi Economic Survey Report (2019-20), although the annual growth rate for the vehicle sales almost halved to 4.4%, the count of vehicles in Delhi has more than doubled to 643 per thousand population in 2019-20 from 317 in 2005-06. Among other issues, the increase in number of vehicles has manifested in increased demand for parking. The issues of parking strategies, with equal emphasis on parking demand management, are to be addressed. Delhi has a very high share of daily active travel (walking and cycling) trips, constituting 42 per cent of the total trips. However, in the last decade, the share of walk trips has shown only a negligible increase and cycle trips have reduced by nearly a third. Most of Delhi’s roads are also not conducive for pedestrian and cyclist movement due to unequal road space distribution and lack of adequate infrastructure. In 2018, more than half of the fatal road accidents in Delhi involved pedestrians and cyclists. Road safety has emerged as one of the important concerns in Delhi, and measures to create a safe walkable and cyclable environment are urgently required Modal Split of Motorised Trips[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 552 Delhi has a robust public transport network in the form of metro, ring rail and bus services. Apart from intra-city trips, the metro caters considerable long distance regional trips also, with maximum footfalls seen on the Yellow, Blue, and Red lines that connect Delhi to the neighboring towns of Gurgaon, Noida and Ghaziabad, respectively. Buses are the preferred and most accessible mode of public transport due to affordable pricing and network coverage. Ring Rail, a part of Delhi’s legacy infrastructure, is being used for transporting freight and is presently running at only 50% of its potential passenger ridership. While the Ring Rail plays a significant role in freight transport and keeps almost 20,000 trucks off Delhi’s roads, its role in transporting people needs to be re-imagined. New mobility trends show that people are shifting towards app-based mobility options as it offers flexibility of mobility and provides an alternative to owning a private car. Emergence of these shared mobility options complemented by the expansion of the metro network, is gradually changing mobility choices made by commuters from private ownership to shared or public transport-oriented options. Public transport system of Delhi needs further integration at institutional level, spatial level and at systems level; to provide a seamless travel experience to the commuters. Institutional integration could be enabled by a larger mandate, efforts towards achieving spatial integration (land use & transport integration, multi modal integration, last mile connectivity, etc.) and systems integration (bus route rationalization, Intelligent Transport Systems including unified ticketing, command and control center for better traffic management, etc.), have been initiated, but need to be reinforced. The upcoming High Speed Rail (HSR) Corridor, Regional Rapid Transit System (RRTS), construction of bypass/peripheral roads, etc., will serve to redefine regional mobility and decongest Delhi. Additionally, the TOD Policy provides Delhi with a unique opportunity to redevelop and densify strategic areas and improve public transport accessibility. The Electric Vehicle Policy of GNCTD is also a step towards promoting green mobility options in Delhi and reducing carbon footprint. Mobility trends in future will lean towards Electrification, Shared Mobility, Mobility on Demand and Autonomy; therefore, it becomes important for Delhi to change gears from building for transport to managing travel demand. The land pooling areas in Delhi will also offer the opportunity for improvement of last mile connectivity to the upcoming mass transit network in these areas. Considering the projected population growth for the horizon year, Delhi is estimated to generate 46.2 million trips daily (excluding walk trips), with an average per capita trip rate of 1.58. The total number of trips has been estimated based on the following assumptions:[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 553  50% of the population would be living within the transit influence zones by 2041. The mixed-use development in these zones will reduce the need to undertake a trip and proximity to the transit node would encourage a shift towards PT.  Large section of the population would be working from home considering a larger shift towards service sector by the horizon year of 20 years. By 2041, the Plan envisages Delhi to achieve a modal split of 80:20 in favor of public and shared transport. This will require a 1% increase in the public and shared mode trips every year and an equal reduction in private vehicular trips. This Section comprises of the following chapters with framework for coordinated planning and execution of mobility initiatives to improve the efficiency of the transportation system as a whole. It also provides different strategies for improving regional and local connectivity and transport infrastructure, enabling modal shift in favour of shared modes, enhancing facilities for walking and cycling, optimizing parking requirements and facilitating better parking management: MOB 1: Improving connectivity and transport infrastructure MOB 2: Shifting from private to shared mobility MOB 3: Making Delhi walkable and cyclable MOB 4: Managing Parking in Delhi Chapter code 9.0 IMPROVING CONNECTIVITY AND TRANSPORT MOB 1 INFRASTRUCTURE 9.1.1 The mobility network of Delhi needs to constantly evolve and respond to the new developments in adjoining urban centres and upcoming regional transport and logistics infrastructure. impacting the commuter and freight movement patterns of the city. The city also needs to address internal challenges for providing access to newly urbanized areas, reducing congestion, revitalizing underutilized transport infrastructure, encouraging walking and cycling, etc. Importantly, mobility trends in the future will be characterized by increased use of clean fuels, implementation of technologically advanced transit systems and artificial intelligence for traffic and parking management. There is a need to gear up for such transformational changes and implement efficient and sustainable mobility solutions in the city. 9.1.2 The regional and city-level strategies presented in this chapter envisage the following: i) Enhanced inter-city and intra-city commuter and freight movements ii) Improved utilization of land assets associated with transportation iii) Substantial migration to smart and green mobility solutions 9.2 Improving regional connectivity[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 554 9.2.1 Rail: The railways connect Delhi to the rest of the country through five major railway stations, namely New Delhi, Old Delhi, Hazrat Nizamuddin, Anand Vihar Terminal and Delhi Sarai Rohilla. Station redevelopment of the existing railway stations will improve the multi-modal traffic flows and commuter movement around the station areas. Interchange facilities shall be developed between railway stations and proximate ISBTs, bus terminals, metro or RRTS stations, etc. in the form of multi-modal transit hubs. Over station development controls of the transit- oriented development for identified sites is being permitted to provide better transit and passengers facilities at these terminals. (ref: DEV3) 9.2.2 Air: The international and domestic air passenger movement is catered to by Indira Gandhi International Airport and Palam Airport. This airport has an annual passenger footfall of 67.3 million. With the inception of the International Airport at Jewar, it can be anticipated that some of the passenger and freight traffic will get diverted from IGI Airport. The connectivity between these two airports, Delhi and the new Airport at Jewar need to be strengthened through road-based and, metro- based connectivity. 9.2.3 Mass Rapid Rail: Strategic corridors of the Delhi Metro shall be implemented to further improve the connectivity of the NCR cities. The Regional Rapid Transit System (RRTS) and High Speed Rail Corridor will play a major role in decongesting various entry points into the city and further reinforce the strong interlinkages between Delhi and the surrounding region for economic activities, housing and other services. RRTS stations within Delhi to be located in close proximity to existing railway terminals/ stations, metro stations and ISBTs and have direct interchange facilities for seamless travel of commuters. Wherever feasible such stations to be integrated with other local mass transit stations as multi-modal transit hubs (ref: MOB 2). The Inter-State Bus Terminals (ISBTs) serve as important regional connectivity nodes of the city. These nodes need to be improved by creating interchange facilities with other transit stations as multi-modal transit hubs, wherever feasible. (ref:MOB2). All future proposals for ISBTs preferably be located at entry points of the city on National Highways with robust multi-modal connectivity with rest of the city. 9.3 Institutional framework for integrated mobility management 9.3.1 An efficient urban transport system requires high level of coordination at all levels of planning, implementation and day to day operations at both city and regional level. The previous plan recommended setting up of a Unified Metropolitan Transport Authority (UMTA) for this purpose. This Plan endorses this proposal and further recommends that the possibility of creating such an authority should be examined in a time bound manner. 9.3.2 Till such time that UMTA is constituted, an interim Coordination Committee shall be set up under the GNCTD, with representation from all transport agencies/ departments, traffic police and local bodies. UTTIPEC shall provide technical support to the Committee. 9.3.3 The UMTA/Coordination Committee ensure a ‘comprehensive approach’ and[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 555 adopt an ‘incremental outlook’ towards mobility management, focusing multi- agency priorities and investments. This may include creation of a common fund and platform for joint action. 9.3.4 The UMTA/Coordination Committee shall be responsible for commissioning and implementing the Comprehensive Mobility Plan (CMP), coordinating the projects and actions of different agencies and implementing various multi-agency projects for adopting smart solutions. 9.4 Comprehensive Mobility Plan 9.4.1 Efficiency of urban transport is heavily dependent upon seamless integration between various road-based, rail-based, intermediate public transport (IPT) and walking/cycling systems. A Comprehensive Mobility Plan (CMP) shall be prepared for Delhi to achieve systemic integration across all levels and modes of urban transport. The CMP shall be aligned with the provisions of MPD 2041 and shall provide a detailed road map for achieving the transformative agenda of ‘moving towards low-carbon mobility’. 9.5 Strategic Transport Corridors 9.5.1 To improve high-speed connectivity to/from important regional destinations and decongest traffic within the city (particularly due to regional traffic) following strategic transport corridors were identified to be implemented in this plan period. These corridors shall be strategic links or extensions of existing/proposed arterial road alignments as given below: Table 9.0: Strategic Links & their benefits Proposed links Benefits o facilitate freight movement by connecting locations Strategic link 1 generating urban freight traffic that are in close Northern extension of UER II (Tikri Kalan border proximity to UER II (FCI godown at Narela, – Rohini – Bawana – Narela – Ramzanpur), Bahadurgarh IFC, Narela IFC, industrial belt in extending to Loni- Baghpat Expressway in Bahadurgarh and Kanjarwala (proposed), Bawana Ghaziabad Industrial area and DSIDC Narela), with similar trans-river facilities such as Loni ICD, Hindon Airport, and Dadri ICD. o establish connectivity between residential areas in Delhi (Narela, Rohini, etc.) and Ghaziabad (Tronica City and Rajnagar) with employment centres (industrial areas in Delhi and NCR). Improved accessibility to residential areas in Ghaziabad would cater to the affordable housing demand in Delhi. o decongest NH-1 (GT Road), Outer Ring Road, Signature Bridge and Wazirabad Bridge, by providing alternate route to connect Sonipat with Ghaziabad (Sonipat – Narela – Kundli – Alipore – Loni – Shahdara). o facilitate freight movement in Delhi by connecting Strategic link 2 Southern extension of UER Convention Centre Dwarka to cargo handling II (Dwarka to terminal of IGI, and onwards to Tughlakhabad Tughlakhabad), extending to NOIDA-Greater goods terminal and railway station. This route NOIDA expressway (as per site feasibility) could be extended further to connect to similar facilities in NOIDA (Dadri IFC, NOIDA SEZ and[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 556 Industrial areas of Greater Noida and Yamuna expressway) o establish direct connectivity from IGI Airport to Jewar/Noida International Airport o decongest NH-2, Kalindi Kunj Bridge and DND Flyover, by providing alternate route to connect Greater NOIDA with IGI Airport (Greater Noida – Noida – IGI Airport) and by diverting the Delhi- bound traffic from Faridabad o establish connectivity between the industrial Strategic link 3 areas of Gurugram with Delhi and the upcoming Bahadurgarh to Bijwasan (Tikri Border Metro Bahadurgarh Industrial Area. o establish connectivity to IGI Airport from Bahadurgarh and Station - Jharoda Kalyan - Dasana Bus Stand Gurugram through interchange at Dwarka Sector-22 Metro Station – Najafgarh - Chawla – Dwarka metro station. Sector- 22 Metro Station - Bijwasan Railway o establish connectivity between south-west part of Station), extending to HUDA City Center Metro Delhi and the proposed RRTS station at Gurugram Station via Dhundhera and Gurugram Sector-18 Sector-18 (Udyog Vihar). (Udyog Vihar) o improve access to Bijwasan Railway Station from Dwarka, land pooling zones and Gurugram 9.5.2 These links depend upon inter-state coordination to develop the alignments/ stretches that fall within the jurisdiction of neighbouring states and to be treated as priority corridor projects and development of full links shall be pursued through inter-state agreements. 9.5.3 The strategic links shall be developed as transit-priority corridors to facilitate movement of passengers and freight. 9.5.4 Any new road-based trans-city connectors that facilitate thoroughfare movement through the city shall be discouraged, as they act as disincentives for the use of the eastern and western peripheral expressways and result in congestion within the city. Mass transit systems shall be permitted for developing high speed trans- city corridors, as per feasibility. 9.6 Development and improvement of intra-city road network 9.6.1 Delhi is planned on a ring-radial pattern with a hierarchical road network. Broadly, the road network is designed for regional, intra-city and local traffic. The following hierarchy of roads shall be followed: i) National Highways (60–90m ROW): National Highways Authority of India (NHAI) should incorporate the Street Design Regulations (ref: Annexure 7) while developing, widening, improving national highways passing through Delhi. All the National Highways within the city shall be access controlled upto the Delhi border and follow the design regulations of city roads. ii) Arterial Roads (30 – 60m ROW): Arterial roads provide long distance mobility connecting one part of the city to another, carrying heavy volume of traffic of all modes. Existing roads of less than 24m ROW that are functioning as arterial roads on ground may be continued with necessary improvements for enhancing movement.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 557 iii) Collector roads (12 – 30m ROW): Collector roads provide connections between local areas and also connect local streets to arterial roads. Existing roads of less than 12m ROW functioning as collector roads on ground may be continued with necessary improvements for enhancing movement. iv) Local Streets (ROW < 12 m): These are intended for local use with ROW of 12 m or lesser. Such streets may be designed as a mix of slow moving traffic (through traffic calming measures), pedestrian or NMT priority streets or completely pedestrianized streets. 9.6.2 All new roads shall be developed as per Street Design Regulations (ref: Annexure 7). Wherever possible, existing roads shall also be improved to meet the requirements given in the Regulations. 9.6.3 All categories of roads shall be developed as per full cross-section proposed in the master plan or as part of approved layout plans. i) Wherever possible, collector and local roads shall be cleared from all impediments and developed as per standards & Street Design Regulations. ii) Area level parking management (ref: MOB4) shall be taken up to reduce encroachment of carriageways by on street parking and ensure effective utilization of road capacity. 9.6.4 All new arterial roads (including NHs, UERs, etc.) shall include space for multi- modal high-capacity public transportation systems as part of the RoW. The transit stations shall include plazas and open spaces for incorporating spill over of commuters. Space for provision of utility ducts for various services shall also be made in the RoW in existing and new road stretches as per feasibility. 9.6.5 Road safety audits of urban roads in Delhi should be in line with the vision of Ministry for Road Transport & Highways for creating a safe travel environment for pedestrians and cyclists. Strategies towards achieving this goal have been detailed in MOB3. 9.7 Enhancement of city-level public transport systems 9.7.1 Network integration would be the key to develop a sustainable and need- responsive public transport system for Delhi. The networks of all public transport modes shall be planned such that they operate harmoniously as a single system to provide transport services, in a complementary manner. Integrated network planning and route rationalisation shall be planned under the CMP and executed by concerned agencies in a coordinated manner. First and last-mile connectivity shall be encouraged through walking, cycling and demand-based sustainable shared modes (e-rickshaws, auto-rickshaws, cabs, cycle-rickshaws, etc.). 9.7.2 Metro, RRTS and other mass rapid transit systems: Mass Rapid Transit System (MRTS) shall be defined as any system with the capacity to carry more than 5,000 Peak Hour Peak Direction Traffic (PHPDT) having dedicated right of way.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 558 9.7.3 The Delhi Metro supported by bus system shall form the primary MRTS. The upcoming RRTS network will also support intracity trips. It is expected that more than 50% of the developed area of the city (excluding land pooling areas and green development areas) shall be within walking distance from metro stations, after completion of Phase IV and Phase V, which are in the pipeline. Ridership of this extensive infrastructure can be substantially increased through improvement in last mile connectivity (ref: MOB3) and by implementing initiatives suggested for improving the uptake of public transport (ref: MOB2). 9.7.4 Other forms of MRTS such as Metro Lite/ Metro Neo or LRT systems, Bus Rapid Transit (BRT) system or any other system that meets the definition given in Clause 9.7.2 shall be developed as per specific site context, projected ridership, etc. to supplement the rail-based MRTS. 9.7.5 The following strategic MRTS corridors should be developed over the next plan period: i) Extension of metro corridor from Rithala Metro Station (Red Line) to Narela connecting the Bawana Industrial Area, Narela Industrial Area, residential areas developed by DDA at Narela and proposed RRTS station at Kundli. ii) Extension of metro corridor from Dhasana Bus Stand Metro Station (Grey Line) to Najafgargh-Daurala Road via Dwarka Metro Station and further extending to AIIMS campus at Jhajhar. The proposed link would provide direct connectivity between Zone L (land pooling area) and Najafgarh vide Dwarka Metro Station on Blue Line and IGI Airport. It would also make the new AIIMS campus at Jhajhar accessible to the citizens of Delhi. 9.7.6 In order to provide mass transit connectivity to land pooling areas, an incremental approach shall be implemented. BRT systems or high speed bus routes shall be implemented during the course of development of sectors facilitating movement from these areas to various parts of the city. Metro rail systems may be implemented along specific corridors. UER-II shall be specifically targeted for development of MRTS to provide trunk connectivity across all land pooling areas. 9.7.7 Bus systems: The larger outreach of the bus system shall be leveraged to provide high quality road-based public transport, provide accessibility to inadequately served areas, also act as a feeder for MRTS systems. i) Bus routes shall be rationalised to connect to Metro/ RRTS stations as well as provide better, more frequent services to areas with low Public Transport Accessibility Levels (ref: MOB2). ii) Concerned agencies shall plan and operate exclusive feeder bus services (RTVs, metro feeders, etc.) for areas where city bus service is low and operate special routes serving the land pooling areas as and when sectors develop. iii) Quality improvement initiatives (information systems, associated infrastructure like bus shelters, O & M of buses, inclusion of special services catering to special needs, premium routes, etc.) may be adopted for improving the service levels. (ref: MOB2).[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 559 9.8 Regeneration of Transport Infrastructure 9.8.1 Ring Rail is a legacy infrastructure of Delhi and it plays a significant role in freight transport. However, the passenger ridership is low. In order to increase its ridership accessibility improvements may be implemented for the major halt stations by creating public plazas, providing walking and cycling infrastructure, and installation of proper signage. Interchange facilities may be planned for integrating Ring Rail stations with existing metro stations. The Ring Rail alignment connects areas of heritage, ecological assets of Delhi and many commercial areas, a special hop-on and hop-off service may be considered for movement of tourists. 9.8.2 Underutilized transportation properties/structures and land in Delhi offer a significant opportunity to optimally utilise these properties/land and maximise non- fare box revenue. The following strategies shall be implemented: i) Bus depots and terminals shall be modernized and monetised as multi- level bus parking facilities, along with commercial or facility development; (ref:DCN). This will increase the parking capacity of the depots and terminals as well as enable land value capture. The use of bus terminals and depots for development of public parking along with parking of public buses, private buses should be explored for specific project sites. 9.8.3 Over station and over-tracks development shall be permitted at railway/metro/RRTS stations and depots as per TOD. (ref: DEV4). 9.9 Freight logistics and distribution network 9.9.1 Freight movement constitutes a major part of Delhi’s urban traffic and has high environmental costs. The Eastern and Western Peripheral Expressways are expected to substantially reduce thoroughfare freight traffic using city roads. With digital advancement and emergence of e-commerce, freight demand is anticipated to increase, along with increased demand for logistics and warehousing facilities in the city. 9.9.2 The CMP for Delhi shall plan for freight and provide detailed strategies for decongesting urban roads, improving freight movement and connectivity to, logistics and warehousing hubs in the city. The CMP shall include recommendations for improving the capacity of freight movement through rail- based transport (leveraging the Rail/Ring Rail infrastructure) and for developing efficient interlinkages with the regional IFCs proposed by NCRPB under the Functional Plan 2031. 9.9.3 IFCs/ICDs are major employment centres with high footfall. The CMP shall make specific recommendations for improving connectivity (including public transport) of such facilities with the rest of the city. 9.9.4 New Integrated Freight Complexes (IFCs) shall be developed as multi-functional spaces integrating various logistics, warehousing and freight-related needs. Modernisation of existing IFCs shall be incentivized through appropriate incentives for regeneration (ref: DEV3). New IFCs, if any, shall be preferably located on the National Highways (NHs) and align with the freight distribution network of the city.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 560 9.9.5 Supporting e-commerce distribution network: Due to emergence of e-commerce, the need for a new layer of ‘warehousing to home’ distribution and storage network has emerged at a local level. In order to facilitate organized growth of e- commerce, uses such as warehousing facilities, distribution centres, etc. shall be allowed in wholesale markets, IFCs and industrial areas. These facilities shall establish a hub- and-spoke network within the city and optimize vehicle kilometres travelled in freight distribution. Use of electric vehicles/ NMVs for last mile distribution shall be encouraged. 9.10 Electric-mobility 9.10.1 E-mobility is gaining momentum in Delhi and it is envisaged that through policy push, incentives, and infrastructure provisions, usage of e-vehicles will eventually gain precedence over fossil fuel-based vehicles. The following strategies shall be implemented to achieve this: i) Public charging infrastructure for Electric Vehicles shall be made available throughout the city at various public places, on-street parking areas and public parking sites. This may be enhanced incrementally based on trends in market share of e-vehicles and based on the estimated traffic in a grid block. In the absence of design standardization of charging equipment, kiosks with multiple charger models shall be made available at all public charging stations. ii) Fuel stations, metro station parking, railway parking areas, authorised on-street parking or other government-owned parking shall be retrofitted with EV charging infrastructure. All new fuel stations allocations shall have mandatory space allocated to electric charging infrastructure. iii) Provisions for an environmentally safe and efficient battery recycling eco- system shall be made by the concerned agencies. iv) Land required for setting up separate/exclusive battery recycling centres shall be provided by the concerned agencies in their respective areas. 9.11 Intelligent Transport Systems for smarter transportation 9.11.1 Intelligent Transport System (ITS) shall use data repository and artificial intelligence to play a major role in improving the efficiency and coordination amongst different transport modes/systems in the city. i) A Mobility Data Repository (MDR) should be set up for Delhi, where reliable and accurate data pertaining to traffic volume and O-D trends, accident hotspots, congestion, freight traffic, etc. can be made available in an integrated framework. Data collated from different transit agencies shall be standardised and regularly updated through surveys and information. ii) Smart solutions through ITS will enable use of real-time data for forecasting and mitigating potential challenges, use of predictive technologies for dynamic and efficient management of public transport fleet operations, system integration, and providing real-time information to commuters, to enhance the resilience of transportation systems. iii) Utilisation of ITS for pre-warning and minimising response time of[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 561 emergency vehicles (ambulance, fire tender etc.) by ensuring uninterrupted movement from source to destination. --- x --- x ---- x --- x --- Chapter code 10.0 SHIFTING TO SHARED MOBILITY MOB2 10.1.1. An important objective for the plan period is to build on Delhi’s extensive public and shared transport infrastructure and networks and to reduce dependence on private vehicles to facilitate ‘efficient’ mobility for its citizens. A two-fold efficiency shall be pursued, i.e. (i) minimizing the time and effort required for undertaking a trip from origin to destination (point-to-point mobility), and (ii) ensuring that the trip is completed with a low carbon footprint (green mobility). This will be achieved by moving more people towards using shared modes of transport that include public transport like bus and rail as well as intermediate public transport, app-based services, etc. Strategies such as transit-oriented development, upgrading the service levels of non-private transport, and strict regulatory measures to discourage use of private vehicles, shall be implemented envisaging the following: i) Reduced share of private transport as a proportion of the total motorized trips in the city. ii) Improved efficiency of commuter movement in the city in terms of average number of motorised trips per capita, average trip time and average trip length. 10.2 Synergy between Land use and Transport 10.2.1. The Plan shall promote integration of land use and transport by optimizing the density and mix of homes, jobs and facilities closer to public transit points such as metro and railway stations, multi-modal hubs, major bus terminals, etc. Such development with improved access to transit stations shall encourage more people to use public transport for their everyday travel needs. 10.2.2. Land use and transport integration shall be implemented through the following strategies: i) Intense mix-use development at TOD Nodes: Select strategic transit stations, referred to as TOD Nodes (ref: DEV4) shall be developed with higher norms for FAR and permissible mix of uses. The norms shall only be applicable within an identified influence zone (notional radius of 500-800 m), which shall be planned for improved walkability and last mile connectivity. TOD Nodes shall include selected major transport junctions like ISBTs, major Railway and RRTS stations, metro interchanges and other select stations, identified for their potential as future economic and cultural hubs. ii) Regeneration Schemes in Transit Influence Zone: In order to facilitate the implementation of TOD principles across the city and not only at select TOD nodes, specific norms for mixed use, parking, ground coverage and[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 562 built-to- edge active frontage shall be permitted within 500 m radius of all other transit stations for all regeneration projects. However, the permissible FAR and other norms for such projects shall be as per Regeneration Policy for Delhi. This will allow creation of vibrant and active station areas without additional FAR/built space stressing the infrastructure. (ref: DEV3) iii) TDR receiving zones along new high-speed transit corridors (UER): In land pooling areas (ref: DEV1), flexible location and loading of entitled FAR shall be permitted in a sector, allowing for concentration of higher FAR along the urban extension roads (UERs). 10.2.3. All these transit oriented developments shall be designed to ensure denser street networks, better public areas and active public frontages to ensure safer, walkable and vibrant areas throughout the city. 10.3 Improving public transport & shared modes 10.3.1. An important strategy for encouraging people to choose public or shared modes of transport is to improve their reliability and accessibility associated with efficient level of service. While improvements in shared modes shall continue to be largely driven by private service providers, public transport requires substantial improvements. 10.3.2. Public Transport Accessibility Levels: A detailed analysis of Public Transport Accessibility Levels (PTAL) shall be adopted for the city. This shall be operationalised through an expert agency to be updated and notified from time to time. PTAL mapping will help evaluate the public transport outreach and spatially distinguish high-accessibility areas from low. The analysis shall include all shared modes with fixed routes and fixed fares, including contract IPT modes such as Gramin Seva, autorickshaws, maxi cabs, RTVs, etc., apart from buses, metro rail and their feeder services. Based on such an analysis the entire city can be divided into the following grades of PTAL: Table 10.0 : PTAL Grades PTAL Access Index Range 0 (Worst) 0 - 2 1 2 -3 2 3 – 5.5 3 5.5 - 7 4 7 – 8.5 5 8.5 - 12 6 12 - 20 7 20 - 30 8 (Best) 30 and above i) All future improvements in public transport infrastructure and proposals for area improvement shall be based on this assessment. The CMP for Delhi (ref: MOB 1) shall include a detailed road map for achieving at least a PTAL Grade of 4 across all areas in the city by 2041.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 563 ii) The analysis may also assist in identifying areas with high PTAL values and high density but low public transport ridership. This can facilitate further action in the form of fare rationalisation, improved accessibility, strategic developments, etc. by DDA/local bodies and concerned transit agencies. 10.3.3. Fare rationalization: In order to improve the utilization of public transport for short and medium distances, frequent intra-city trips, increased ridership in high- density areas, and fare rationalisation may be considered by concerned agency. 10.3.4. Express public transport routes: DTC and MRTS Agencies shall consider planning of express routes, connecting high footfall stations/destinations such that the number of stops /halt stations during the journey are minimized and the travel time is optimized. (ref: MOB1) 10.3.5. Premium bus services: Convenience (ease of access and reliability) and comfort (climatic comfort and quality of facilities) are some of the major reasons why people continue to use private transport. Premium bus service operation needs to be explored along identified high frequency routes in the city that connect homes to work centres. These may be designed as a mix of regular fixed-routes, shuttle services as well as on-demand app-based services. 10.3.6. Special services: The Plan targets at night time economies to promote higher economic productivity as well as increasing the availability of vibrant and safe public spaces at night. DMRC and DTC to be encouraged to operate low frequency night time services along specific earmarked routes and networks across the city or for special events/festivals as per feasibility. 10.3.7. Improvement in quality of bus services: i) Upgradation of bus shelters shall be undertaken by Delhi Transport Infrastructure Development Corporation (DTIDC) to include universal accessibility features, audio visual public information systems, CCTVs, distress buttons for emergencies, water kiosks and public conveniences. ii) A reliable and real-time passenger information system (PIS) to be implemented to provide information on routes, timetable, arrival times, travel time, connections, incidents, delays, fares and discounts. 10.4 Integrated Multi-Modal Transport System 10.4.1. Passenger trips between origin and destination may comprise of single mode or multiple modes of travel. The Plan shall facilitate seamless and efficient point-to- point mobility for all citizens through the entire journey. 10.4.2. Network integration across different modes will play a major role in achieving such seamless connectivity. An Integrated Multi-Modal Transport strategy to be prepared as part of the Comprehensive Mobility Plan, providing recommendations for harmonising timings, frequencies and routes amongst different modes. Development of Multi-Modal Transport Hubs (MMTH) shall be an important aspect of implementing MMI strategies. (ref: MOB1) 10.4.3. Multi-Modal Transport Hubs (MMTH): A number of high footfall transit nodes in Delhi have multiple modes located at one location such as railway stations, ISBTs, RRTS stations and metro stations.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 564 These shall be developed as Multi-modal Transit Hubs (MMTH), in earlier plan referred as Metropolitan Passenger Terminal or Integrated Passenger Terminal which are eligible for development norms as per DEV4. i) The UMTA/Coordination Committee shall be responsible for bringing together all concerned transit agencies to undertake coordinated planning and execution of the MMTH projects. A joint MMTH-level layout plan shall be prepared to ensure seamless integration across all modes. Agencies may also undertake joint ventures by amalgamating their lands where multiple modes could be integrated into the same building or complex. (ref: MOB1) ii) In case of non-contiguous land parcels separated by features such as railway tracks, roads, nallahs, etc., integration of buildings using connectors like skywalks, subways etc. to be permitted, provided adequate clearances are maintained to ensure unhindered operations of various modes (ref: DEV4). iii) A special focus of all MMTH projects shall also be towards facilitating first and last mile connectivity. All such interfaces shall be kept well illuminated, safe and vibrant at all times of the day through adequate provision of retail, vending zones, food and beverage outlets, public amenities like toilets and drinking water fountains, etc. iv) Being the focal point of transportation networks, MMTHs will have high potential as hubs for mixed-use development. v) Three locations, namely Anand Vihar-Karkardooma, Kashmere Gate and Nizamuddin-Sarai Kale Khan shall be developed as Multi-Modal Transit Hubs (MMTH). DDA or other concerned agencies may identify other such locations to be developed as MMTH in the future. 10.4.4. Multi Modal Integration (MMI) at all stations: Seamless integration across various modes to be facilitated at transit stations (metro, RRTS, railway station, Ring Rail) and major bus terminals in Delhi. i) MMI plans, including pedestrian/cycling facilities shall be prepared and implemented by respective transit agencies for efficient traffic and commuter dispersal. ii) The following minimum facilities shall be provided at all locations: a) Within 100 m of every alighting point: pedestrian spill over plaza, vending zone, bicycle parking and renting station. b) Up to 300 m of centroid of alighting points: bus stops, IPT stand, pick- up/drop location for private cars or on-demand IPT. c) Up to 500 m of centroid of alighting points: Public parking sites (park and ride facilities) and public amenities as per norms given in SSI2 and the Street Design Regulations. Parking space for various modes shall be based on user profile and adjoining activities/land use. For instance, metro stations in close proximity of educational centres and industrial areas shall have more ECS assigned to bicycles and two wheelers. iii) Adequate land shall be made available for implementing MMI plan by the respective land owning agencies. iv) For all new transit stations and MMTHs, MMI shall be planned and implemented as part of the design. 10.4.5. Technology-based interventions for facilitating MMI:[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 565 i) App-based integration of different modes will be critical for achieving seamless transfer from one mode to another. Transport Department, GNCTD may develop a smart mobility application covering real-time information on available route choices, available modes and their associated fare, frequency, estimated travel time, etc. The smart mobility app shall be integrated with the ITMS developed for the city (ref: MOB1). ii) A unified ticketing system or smart mobility card shall be implemented covering major modes like railway and bus transport. Other shared modes like IPTs, on-demand cabs, etc. may also be considered for integration. iii) A common fare management system may be developed by seeking partnerships amongst the various private service providers and transit agencies. This can facilitate further incentives and fare subsidies to users who move from one mode to another. 10.5 Disincentivising private transport 10.5.1. It will be critical to complement the various initiatives aimed at increasing the use of shared modes with hard regulatory strategies focused on disincentivising private modes of transport. This Plan proposes following three major strategies that are aimed at curbing the use of private vehicles. 10.5.2. Congestion pricing: Road owning agencies in consultation with Traffic Police shall notify specific areas in the city as congestion pricing zones. These may include TOD Nodes (ref: DEV4), Business Promotion Districts (ref: DEV3), Walled City Heritage Zone (ref: HCP2), and the CBD (ref: ECO). Use of technology in the form of RFID tagging etc. may also be explored. by the concerned agencies for management of congestion pricing. 10.5.3. Parking demand management: Restricting the availability of public parking at work centres, entertainment or cultural hubs, markets, etc. can be a major deterrent to private trips. The following strategies along with strict enforcement of parking rules shall be implemented using parking as a demand management tool: i) Supply of public parking (on-street and off-street) within an area would be associated with its public transport accessibility level (PTAL). Areas with high PTAL shall have lower public parking supply (ref: MOB4). ii) Parking charges to be used as a tool for disincentivising private transport usage. Dynamic pricing for peak and off-peak periods, on- and off-street parking (through higher parking charges) to be utilised to decongest areas with high PTAL and/or high vehicular footfall. 10.5.4. Prioritizing pedestrians and cyclists: Concerned agencies, in coordination with the Traffic Police, shall identify specific areas with heavy footfall such as tourist hotspots, markets, etc. with high PTAL levels as ‘pedestrian only’ zones. Tactical urbanism measures to convert streets into fully pedestrian zones for specific time durations to be encouraged, so that overall traffic flow is not hampered. (ref: MOB3) --- x --- x ---- x --- x --- Chapter code 11.0 MAKING DELHI WALKABLE AND CYCLABLE MOB3[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 566 11.1.1 Delhi’s high active travel potential needs to be leveraged and enhanced for people to choose active travel, not only as an affordable mobility option but also as one that is comfortable, safe and accrues health and environmental benefits to the individual and the city. 11.1.2 The existing networks have to be strengthened on priority, utilising green-blue networks (ref: ENV2) in the city as alternative active travel routes, creating safe pedestrian and cycling networks both for short and long distances and reinforcing public awareness about the benefits of active travel. Implementation of strategies for promoting active travel shall facilitate the following: i) Increased access to green and safe mobility with options and opportunities to undertake active travel. ii) Increased proportion of active travel (walking and cycling) trips in Delhi. 11.2 Street design for promoting active travel 11.2.1 Active travel shall be promoted by designing an urban environment where more people choose it as a preferred means for both ‘destination travel’ i.e. to work, school, place of worship, stores, theatres, public transit etc., as well as ‘recreational travel’ i.e. for leisure or exercise. 11.2.2 Streets shall be designed to ensure equitable distribution of road space and safe mobility for users of all ages and abilities, prioritise barrier-free movement for pedestrians and cyclists, and provision of enabling infrastructure to create an ecosystem for active travel. Existing streets shall be incrementally retrofitted to serve pedestrians and cyclists better. Pedestrian walkways/ footpaths shall be provided mandatorily in new development areas. 11.2.3 The following key components shall be included as part of the design of all new road infrastructure and for improvement of existing roads, taking into consideration the hierarchy of roads: 11.2.3.1 Provision of barrier-free and continuous NMT network infrastructure such as footpaths, cycling tracks, etc., for providing shorter and comfortable routes. 11.2.3.2 Points of conflict of pedestrians or cyclists with motorised vehicles shall be minimised through the following infrastructure provisions, as per the patterns of active travel characteristics: i) Pedestrian and bicycle crossings shall be at-grade as far as possible. Carriageways shall incorporate traffic calming elements. ii) Subways or foot over bridges, should be cross-programmed through commercial activity, public art, street performances etc., to ensure a safe and vibrant environment. iii) Installation of pedestrian signals shall be preferred over grade- separated crossings to ensure ease of use for pedestrians, wheelchair users, and cyclists. Pelican crossing system shall be installed near schools and other major pedestrian crossings, especially for[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 567 children, elderly and people with disabilities. 11.2.3.3 Provision of street furniture i.e. benches and other seating, garbage bins, signage, public utilities, e.g. restrooms, child care rooms, changing rooms and drinking water spouts at regular intervals, etc. 11.2.3.4 Earmarking of Multi-Utility Zones (MUZs) and placemaking to accommodate street vendors and kiosks, spaces for public art and other public activities to create active and aesthetically attractive spaces for street life and activity. 11.2.3.5 Improved shading during day and illumination during night for safety of pedestrians and cyclists by providing: i) appropriate shade-providing and pollution-filtering trees of native species and other landscaping elements, as well as green features such as pervious surface, bio-swales, etc. ii) adequate street lighting and illumination to ensure safety and security. Preferable incorporation of pedestrian-scale lighting in addition to ambient illumination. iii) bus shelters with bicycle parking, bays for pick-up and drop-off for private vehicles, taxis and IPT to enhance inter-modal shifts. 11.2.4 All walking and cycling infrastructure, and street improvements will be based on design standards and guidelines prescribed in the Street Design Regulations (ref: Annexure 7). Compliance with the Harmonised Guidelines and Space Standards for Barrier Free Built Environment for Persons with Disability and Elderly Persons 2016 of MoHUA shall be ensured to facilitate accessibility to the elderly, children and persons with disabilities. 11.3 Active Travel Areas (ATAs) and Walk Plans 11.3.1 Active Travel Areas shall be identified by concerned agencies around high activity nodes in the city and Walk Plans shall be prepared and implemented in these areas to improve pedestrian and cycling infrastructure. 11.3.2 Walk Plans shall be made for at least an area within a radius of 400–500m (5-10 minutes walking distance) around any specific destination node such as a heritage precinct, a market, existing residential colonies etc. Actual delineation of area under a Walk Plan shall be based on ped-sheds and/or desire lines. Concerned agencies shall integrate these plans with their respective plans for traffic management, MMI, station dispersal plans etc. 11.3.3 All new developments/projects within land-pooling sectors, TOD and Regeneration Schemes, other special projects shall be treated as ATAs and the layout approval would mandatorily require preparation of Walk Plans. 11.3.4 Existing areas with intense retail commercial activity or exceptionally high pedestrian footfall, weekly markets and areas identified for night economy may be identified as ATA by concerned agencies for part or complete pedestrianisation. (ref: ECO and HCP1). 11.3.5 Walk Plans may also be prepared for existing residential colonies, markets etc.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 568 by the local bodies or RWAs and other stakeholders. These shall be linked to any proposals for creating Parking Management Areas or green-blue infrastructure/networks in the area. 11.3.6 All ATAs shall be connected with major roads (with dedicated cycle tracks and footpaths) that are in close proximity to create continuous city-wide networks. 11.3.7 Areas identified for Walk Plans in the Walkability Regulations shall be developed and implemented on priority basis. 11.3.8 ATAs may be identified by concerned agencies from time to time for which Walk Plans may be prepared and implemented. 11.4 City level Active Travel networks 11.4.1 Continuous active travel networks shall be created for roads of more than 30m RoW. Certain identified routes with existing or anticipated high share of cyclists, pedestrians and those connecting different activity centres, shall be developed as strategic active travel corridors. 11.4.2 Cycling Highways: Certain corridors shall be identified and developed as cycling highways facilitating long distance active travel across the city. 11.4.3 Green Mobility Corridors: These are exclusive pedestrian and cycling pathways proposed to be created along natural drains and the River Yamuna (ref: ENV2) as city level dedicated corridors. In addition, these corridors connecting cultural hubs or Strategic Active Corridors in the vicinity shall provide shorter routes and ensure safety of the pedestrians and cyclists. 11.5 Other strategies for promoting active travel 11.5.1 Tactical Urbanism: Implementing agencies can use Tactical Urbanism or pop-up urbanism measures for temporarily retrofitting a street section to prioritise pedestrian and NMT movement by reserving lanes, pedestrianizing street stretches, etc. It is recommended that feasibility of all proposals for creating pedestrian and/or cycling infrastructure be tested on ground before street retrofitting works of permanent nature are undertaken. 11.5.2 Micro-mobility: Battery-operated e-bikes and other green-mobility options may be encouraged. Parking provision and PBS systems for such vehicles in ATAs and along Strategic Active Corridors must be encouraged to serve the elderly as well as people with restricted mobility. 11.5.3 Citizen Engagement: All concerned departments/agencies may design awareness campaigns and public engagement strategies for proposed projects and plans to boost consensus building for active travel interventions and induce change in travel behaviour. i) Concerned agencies, local bodies etc. may undertake dedicated campaigns for various citizen groups including school children, women, elderly and people with disability to raise awareness about benefits of active travel, traffic rules, regulations and penalties, pedestrian first principle, etc.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 569 ii) Active travel may also be promoted as a mobility choice to ensure social distancing in the times of disease outbreaks or pandemics. 11.5.4 Employing Technology for Active Travel: Technology and networking can effectively enable active travel and enhance experience and safety of pedestrians and cyclists: i) Smart applications shall be developed by concerned agencies to provide information regarding walking and cycling routes, tours, marathons, greenways, heritage trails, location of public facilities, PBS with real-time availability, popular destinations/ eateries and upcoming cultural events. Special applications may be developed for people to rate routes and areas for walkability and cyclability and reporting related issues; ii) Smart sensors for Ambient Air Quality Index (AQI)measurement can be set up at traffic signals to provide real-time air quality information to citizens; iii) Energy generating tiles may be used for footpaths and paved areas. The energy (coupled with solar energy) can be used to power street lights as well as provide charging points for mobiles and other electronic gadgets near seating or resting spots; iv) State-of-the-art surveillance technology can be employed to ensure safety of pedestrians and cyclists, adherence to traffic rules and prevention of vandalism of street furniture. --- x --- x ---- x --- x --- Chapter code 12.0 MANAGING PARKING IN DELHI MOB4 12.1.1 Low-carbon mobility is one of the imperatives for Delhi. In line with the Environment Pollution (Prevention & Control) Authority for the National Capital Region and the National Urban Transport Policy, 2006 and in order to utilise land optimally, the parking strategy will focus on demand management of existing parking, through re-organisation of parking facilities and maximising their use. Strict enforcement of parking rules and regulations will be essential for managing parking and contribute towards inducing modal shift in favour of public transport and shared modes. The parking strategy of the master plan envisages rationalised supply of public and private parking adjusted with levels of accessibility to public transport and shared modes, and availability of parking. 12.2 Guidelines for a city-wide parking strategy: The following guidelines and strategies shall direct overall parking provision in the city: i. ‘User pays’ principle: Users of all personal motor vehicles (PMVs) (except NMT) have to pay for use of authorised parking facilities/spaces/streets.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 570 ii. Rationalise parking supply: Supply of public parking (on-street and off- street) within an area and ECS norms within a use premise to be rationalised as per the public transport accessibility level (PTAL) and the availability of parking infrastructure. iii. Pricing of parking: Parking charges shall be used for reducing the demand for on-street parking and increasing usage of off-street parking (especially MLCPs). Congestion pricing (through higher parking charges) shall be utilised to decongest areas with high PT access and/or high vehicular footfall volume (commercial areas, mixed-use streets, work centres, etc.). iv. Maximise parking utilization: The use of parking facilities and captive ECS shall be maximised by treating parking spaces as shared resource. Staggered peak hours of different uses may also be explored to manage parking demand and increase parking turnover. Parking capacities of off- street parking sites can be increased by utilising mechanised stack parking. v. Adequate provision of parking for all modes: Parking supply in the city shall consider the parking demand for not only PMVs but also for other modes such as utility and emergency vehicles, shared modes (IPT, feeder modes, etc.), freight vehicles, cycles etc. 12.3 Parking Management Area Plan (PMAP) 12.3.1 Consistent with the Delhi Maintenance and Management of Parking Places Rules, 2019, a comprehensive area-based approach shall be adopted for supply and/or management of parking in an area/ locality. 12.3.2 Parking Management Areas (PMAs) shall be delineated to implement parking related interventions for managing demand, regulating available parking and reducing associated externalities. PMAs shall be identified and delineated by the concerned local bodies in consultation with local residents, market associations, Traffic Police, Transport Department of GNCTD, etc. 12.3.3 Parking Management Area Plans (PMAPs) shall be prepared for PMAs. These plans shall include strategies for parking management, parking charges, ITS application and enforcement of the plan. 12.3.4 For government designated PMAs, the Transport Department of GNCTD shall be the core agency for preparation of PMAP in consultation with the road owning agencies and local stakeholders. Experts/ consulting firms/institutions may be engaged to expedite the process of PMA delineation along with RWAs, market associations, transport operators and/or trade associations, etc. may undertake preparation of PMAP for an identified area. 12.3.5 For areas of strategic significance like BPDs, TODs, etc., PMAPs shall be integrated with their respective improvement plans , Regeneration Plans, IZPs, etc.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 571 12.4 Management of Public Parking 12.4.1 Public parking includes all authorised on-street and off-street parking, including MLCPs and is provided by the local bodies/ private entities at various locations across the city, and by transit agencies near stations. In areas with high PTAL and traffic congestion zones, public parking supply shall be regulated through exponentially high parking charges and discourage the use of the personalised vehicles. 12.4.2 All public parking shall be designed as per the prescribed standards and guidelines and Parking reserved for persons with disability shall be free of charge. 12.4.3 Open areas (tot-lots, parks, playgrounds) and ecologically sensitive areas (rivers, lakes, floodplain, forest, ridge etc.) or any other kind of open space with public benefit shall not be utilized for development of parking (surface/underground/multi-level) 12.4.4 Parking charges for public parking to be dynamic and variable rates shall apply across the city and at different times, to spatially distribute the parking demand. Concerned agencies to ensure that streets with high level of activity and congestion are priced higher than other places. These charges may be subsidised for green fuel vehicles. 12.4.4.1 Parking charges can be temporarily increased for air pollution control during periods of severe pollution as per Graded Response Action Plan for Delhi - Ministry of Environment, Forests & Climate Change. 12.4.5 Provision of on-street parking i) On-street parking shall be provided such that it does not hinder the circulation of pedestrians and vehicles. ‘Parking’ and ‘no-parking’ zones shall be clearly demarcated and on-street parking defined by use of suitable signages and pavement markings. To optimise space, parallel on- street parking shall be preferred over angular/ perpendicular parking. ii) On-street parking shall be provided in close proximity to high-footfall uses such as hospitals and schools, public offices, etc., Adequate pick up/ drop off arrangements shall be made within such plots. iii) Appropriate allocations shall be made for two-wheelers and four- wheelers at all on-street parking locations. iv) On-street public parking for personalised motor vehicles shall not be provided at the following locations: a) On roads less than 12 m and above 60m RoW. This can be relaxed for unplanned areas. b) Up to a distance of 250 m from any transit station/hub like metro stations, RRTS stations, suburban rail stations, ISBTs, etc. c) On fully pedestrianised streets. d) Under flyovers and overpasses to avoid fire hazards[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 572 v) On-street public parking shall be discouraged within 1000 m distance from an existing MLCP, and shall be priced exponentially higher than the MLCP. vi) On-street parking in residential areas: The aim is to gradually eliminate all on-street parking in residential areas and reclaim this space as public commons, creating safer and more vibrant neighbourhoods. Regeneration of residential areas will enable reorganisation of parking and accommodating parking needs within property premises. A phased approach towards regulating on-street residential parking may be adopted as given below: a) For residential colonies/localities, RWAs may prepare PMAPs after assessing the parking demand, for earmarking areas for on-street parking. Parking supply can be maximised by use of stack parking. b) Local bodies may consider a system of leasing parking permits for part use of public on-street parking space to the residents/RWA of an area. c) A policy linking registration of new vehicles to availability of owner parking facilities may also be considered. 12.4.6. Provision of off-street parking: Off-street parking facilities mainly serve long-duration parking needs of users like shopkeepers, office goers, public transit users, etc. Wherever feasible, off- street parking solutions (surface parking, roof parking, stack parking, multi-level car park and underground parking) shall be adopted. a) Developing off-street parking facility is land and capital intensive, and shall be developed only with consultation and consensus of all concerned agencies/ stakeholders. It can be developed on PPP basis. b) Off-street parking area/facility shall be located in close proximity to high- footfall uses such as hospitals, public offices, etc., in order to supplement the parking need. Direct access to adjacent buildings from off-street parking area/facility shall be provided wherever possible. c) Off-street parking may be equipped with facilities like PBS with e-bikes and bicycles, and parking for IPT and taxis. In case of a notified TOD node, off-street public parking facility shall preferably be provided outside the Intense Development Area, to serve as a ‘park and ride’ facility. d) In order to make construction of MLCPs financially feasible, up to25% of the gross floor area shall be used for commercial/office space. The parking demand generated from the permissible commercial/ office space shall be limited to 25% of the total ECS of the MLCP. e) 80% of the area under surface parking shall be paved with pervious paving. 12.5 Management of Private Parking 12.5.1 Private parking is provided within the premises of privately-owned properties. This parking is provided as per the parking standards, prescribed for each use premise (ref: DCN). Parking standards are provided in the form of Equivalent Car Space (ECS) and include parking for all types of vehicles i.e. cars, scooters, cycles, light and heavy commercial vehicles, buses, etc.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 573 12.5.2 Parking norms prescribed in DCN, shall be rationalised subject to the following conditions: i) If a property is located within 500m radius of an MLCP, the parking requirement (ECS) for that premise/property shall be reduced by 10 percent. This shall not be applicable to exclusively residential properties (i.e. it will apply to commercial and mixed use streets). For MLCP deductions, minimum 50% of the plot area shall fall within the prescribed distance. ii) Based on the Public Transport Accessibility Level (PTAL) value, parking norms as per DCN shall be reduced by the following applicable percentage deductions: Table 12.0: Percentage Deduction in Parking Norms as per PTAL PTAL Access Index Residential Commercial Industrial PSPs Range 0 (worst) 0 - 2 0 0 0 0 1 2 -3 0 0 0 0 2 3 – 5.5 10 5 5 10 3 5.5 - 7 20 10 10 20 4 7 – 8.5 20 20 20 20 5 8.5 - 12 20 20 20 30 6 12 - 20 20 30 30 30 7 20 - 30 30 30 30 30 8 30 and above 30 30 30 30 a) PTAL deduction shall be as per the Access Index Range of the plot. b) For plots falling in multiple Access Index Range, deductions of Access Index Range with maximum area on the plot shall apply. 12.5.3 For area falling within the influence zone of notified TOD nodes, ECS norms as per the TOD Policy shall be applicable. (ref: DEV 4) 12.6 Regulating parking for other modes 12.6.1 Goods vehicles: Goods movement is closely linked to location of wholesale markets, type of produce/item, existing distribution system etc. Adequate area for parking of freight vehicles shall be identified near commercial and industrial areas, IFCs, ICDs, etc. by concerned local bodies/agencies. During restricted entry time, parking for goods/ freight vehicles shall be provided outside toll gates/plazas. i) Parking for vehicles used for e-commerce shall be provided by the respective e-commerce company at the warehousing and distribution facility. 12.6.2 Shared modes: Parking of shared modes such as IPTs, private buses, taxis, etc. may be prioritised in all authorised parking areas. i) All MMI plans shall make adequate provisions for short duration parking of shared modes, and drop off and pick up areas. 12.6.3 Buses: All buses shall be parked at their designated depots. If capacity of[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 574 these bus depots is inadequate for existing or future demand, these depots may incrementally be converted into multi-level parking. For interstate buses, adequate idle parking provision shall be made within the ISBTs. 12.6.4 School transport: Most schools in Delhi do not have adequate space for parking school transport (buses and vans) within their premises. These vehicles are parked on the carriageway of roads causing vehicular congestion and unsafe conditions for children. Following measures are recommended to mitigate this problem: i) All existing and new schools shall provide space for pick up, drop off and parking of school transport within their premises. 12.7 Parking in the Walled City 12.7.1 Concerned local body shall prepare PMAPs for various areas within the Walled City to address congestion, make streets safer for pedestrians and contain movement of motorised vehicles to certain roads/areas only. 12.8 Smart Parking Space Management 12.8.1 Smart apps may be developed to give users real-time information of capacity and occupancy of on-street and off-street parking facilities, nearest available parking spot(s) and charges. All off-street facilities shall deploy digital display at their entrances to show the availability of parking spots. 12.8.2 App-based platforms can also facilitate use of parking (including privately owned parking spaces) as a shared resource. 12.8.3 Many junk vehicles are parked/abandoned around the city, and occupy scarce road-side space. Local bodies and the Traffic Police shall ensure that such vehicles are taken to scrapyards within a definite time frame. x x x x SECTION 6[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 575 PHYSICAL INFRASTRUCTURE BACKGROUND AND KEY POLICY CONCERNS Water Supply: The water supply and distribution in Delhi is largely managed by the Delhi Jal Board (DJB). In areas under the New Delhi Municipal Council (NDMC) and Delhi Cantonment, DJB supplies water in bulk while NDMC and Delhi Cantonment manage the distribution. In areas not covered by the distribution system, DJB provides water through tanker service. Delhi is a water scarce city and pressure on available water resources has increased manifold due to population growth wasteful consumption and systemic loss of water. There are visible accounts of decline in groundwater levels, heavy pollution in Yamuna river and frequent waterlogging instances across Delhi. Lakes and other water bodies, are not functioning effectively as recharge structures, majority of rainwater is not harvested, limited sewerage network restricts the capture of generated wastewater and treated wastewater is minimally reused. As Delhi is predominantly dependent upon external sources for fresh water, the continuous increase in future demand may out perform the supply. There are some long-term possibilities, which concerned authorities may explore to procure raw water through inter-state agreements, for meeting the city’s future requirement. Delhi is steadily moving towards alarming levels of water scarcity and to achieve water security in Delhi, the current supply-oriented water management approach needs to be replanned. Water security for Delhi shall be a function of water and water-related environmental services from sustainability point of view. An Integrated Urban Water Management (IUWM) approach can be adopted for Delhi where water supply, wastewater management and storm water drainage shall be interconnected for having ‘water- linked infrastructures’ in an urban water cycle. Surface water, rainwater, wastewater and groundwater are considered here as four access points of water that have to be managed together. The focus is on reducing reliance on surface water and ground water and realizing the potential of the non-traditional sources of water for future water needs of Delhi. The IUWM approach, maximizes efficient water use. The estimated water demand for Delhi is as follows: Year Population Deman Availability from Total Deficit (millions) d all deman (MGD criteria* source d (MGD) ) (GPCD) s (MGD) 2020 19 60 935 1140 141 2031 29.1 60 - 1746 - 2041 29.1 50 - 1455 - *Includes domestic, commercial, industrial demand and that for fire services, etc. However due to the limited availability of raw water to Delhi, DJB targets of demand of potable water for domestic use needs to be rationalized and progressively[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 576 reduced to 50 GPCD (225 LPCD) and supplemented by using non-potable recycled water of desired quality standard for non-potable purposes. Water demand for industrial and horticulture/gardening/agriculture purposes to be fulfilled from recycled waste water of desired quality standards. Potable water demand for the projected population of 29.1Million @ 50 GPCD works out to be 1455 MGD. Wastewater Management: In Delhi, wastewater is managed both by a sewage distribution network system and onsite sanitation system in the form of septic tanks. DJB is responsible for the entire value chain of sanitation network that includes collection, treatment and disposal of wastewater. Approximately 45% of Delhi is not covered by sewerage system and sewage generated from the remaining area flows through a number of surface drains into the river. However, apart from the planned areas, DJB is also extending sewer lines in the unauthorized colonies of Delhi. DJB has also planned decentralised waste water treatment system and other sludge management systems to avoid dumping of untreated sewage into the drains.In areas where laying sewer lines is not possible, DJB has planned to capture the untreated effluent from the 108 sub-drains through a parallel system of Interceptor Sewer Project (ISP), targeting to trap and treat 242 MGD of untreated effluent before it lands into the river. With the rise in population and demand for water, the total generation of wastewater is expected to be around 1200 MGD by the year 2041. The present treatment capacity is about 597 MGD which has to be upscaled substantially and the load on centralized treatment system can be substantially reduced by deploying strategies for decentralized treatment at the plot/scheme level. Treatment and reuse of treated wastewater is also a potential opportunity to reduce the water supply-demand gap. Drainage: The drainage morphology of Delhi is defined in a large measure by the Aravalli foothills and connected outcrops. Under these influences, an easterly storm water movement is indicated from the higher elevations in the West towards Yamuna in the East. Delhi has been demarcated into six drainage zones namely (i) North Zone, (ii) West Zone, (iii) Central North West and South East Zone, (iv) Central South and South East Zone, (v) East Zone, and (vi) South Zone. Eleven different agencies namely Irrigation and Flood Control, Public Works Department, South Delhi Municipal Corporation, North Delhi Municipal Corporation, East Delhi Municipal Corporation, New Delhi Municipal Council, Delhi Development Authority, Delhi State Industrial and Infrastructure Development Corporation, Delhi Cantonment, National Thermal Power Corporation Limited and UP Irrigation own and manage the storm runoff emanating from the entire urban expanse of Delhi which is carried by about 426.55 km of natural drainage lines and about 3,311.54 km of engineered storm water drains. To alleviate the flooding conditions in various parts of the city, storm water drainage infrastructure to be made efficient. So, it is pertinent to apply corrective spatial strategies to address the deficient drainage infrastructure and introduce low cost flood- prevention measures such as water body rejuvenation, using parks for rainwater harvesting etc. Further, solid waste and sewage needs to be managed so that flow of storm water is not hindered.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 577 Solid Waste Management (SWM): The trend of solid waste generation in Delhi has been rising for the last several years. The management of municipal solid waste (MSW) in Delhi is under the jurisdiction of the local bodies. The local bodies have categorized Delhi into 12 zones for solid waste management. Non-municipal waste includes e-waste (electric, electronics, battery waste), biomedical waste, hazardous waste and construction and demolition (C&D) waste. In Delhi, non-municipal waste is processed at units authorised by Delhi Pollution Control Committee (DPCC), to monitor its management. The Ministry of Environment, Forests and Climate Change has notified separate rules for management of waste and these shall be strictly implemented. In Delhi, the critical part of the waste is the municipal solid waste (MSW). Approximately 55% of the MSW generated in the city ends up in 3 Sanitary Landfill Sites (SLFs). The low SWM efficiency of Delhi is a result of low waste segregation and recycling (processing) efficiency. Considering the current trends of per capita waste generation, the total quantum of municipal solid waste (MSW) generated in the city is expected to increase substantially, from 12,350 TPD to 18,915 TPD by 2041. Year Population MSW generated Collected Current Waste sent (million) (@650 wast processin to landfill gm/capita) e (TPD) g (TPD) capacit y (TPD) 2020 19 12,350 10,500 (85% 45% 4,725 efficiency) 2041 29.1 18,915 - - - The municipal corporations adopt different methods to manage waste , The overview of solid waste management infrastructure in Delhi is as follows: Sl. No Facility Location Capacity Managed by 1. Composting Plants 1. Okhla 200 TPD IL & FS 2. Bawana 700 TPD North DMC through DMSWSL 2. Waste to Energy Plants 1. Bawana 1500 TPD North DMC 2. Okhla 1800 TPD SDMC 3. Ghazipur 1300 TPD EDMC 3. C&D Processing Plants 1. Burari 2000 TPD North DMC 2. Shastri 500 TPD EDMC Park 3. Ranikhera 150 TPD DMRC 4. Landfills 1. Bhalaswa 70 Acres North DMC 2. Ghazipur 70 Acres EDMC 3. Okhla 46 Acres SDMC The land fill sites have already exceeded their capacity, and shall have impact on the city’s SWM infrastructure. Strategies for reducing per capita waste generation, increased processing, recycling capacity and decentralised management are to be[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 578 addressed. Power Supply, Communication and Gas Infrastructure: Power supply in Delhi is managed under four broad categories—generation, holding, transmission, and distribution. The per-capita power consumption in Delhi is more than 1561 units per annum as against the national average of 1122 units 2016- 17. Delhi’s electricity utilization pattern is characterized by 52% for domestic use followed by 26% for commercial use, 12% for industrial use and 10% for others (agriculture/ landscape maintenance/ transport infrastructure maintenance etc.). Delhi’s peak demand has doubled in the last 10 years, growing faster than the population of the city. The power transmission network in Delhi consists of four 400 KV and thirty-six 220 KV substations. The existing network consists of a 400 KV ring around the periphery of Delhi interlinked with the 220 KV network spread across the city. Delhi currently has an annual power consumption of 30,197 Mus. The total installed capacity is 7479.01MW andout of the total installed capacity, 78 % of power is purchased while the rest 22% of the installed capacity is within Delhi. The composition of existing installed capacity is powered by sources of generation such as Coal (59%), 28% Gas (28%), Hydro (10%) and Solar (3%). The overarching national policy through the assigned Renewable Purchase Obligation (RPO) as well as the state level solar policy 2016 sets out targets to meet about 20% of power consumption from renewable sources by 2022. Delhi has to meet roughly 50.5%1 of its power consumption from renewable sources by 2041 to fulfil the national level targets set by MNRE. As per the trends indicated by Department of Power, GNCTD, the power consumption demand by 2041, is projected to reach 63,389 MU. Peak demand is likely to double and increase up to 19,070 MW. Based on this it is estimated that the total installed capacity would also need to be increased threefold up to 21,930MW (15% over and above the estimated peak demand). Year Population Power Peak demand Overall (million) consumption (MW) installed demand capacity (MU) (MW) 2019 19 33,082 7,409 7,901 2031 24.7 47,167* 12,269** 14,110 2041 29.1 63,389* 19,070** 21,930 * assuming power consumption growth rate as 3% Digital infrastructure and services are increasingly emerging as key enablers to Delhi’s growth. The wide spread usage of ICTs and internet has notably driven majority of the app-based economy and services. Apart from public agencies, the private sector plays an extensive role in servicing the city. Delhi needs to align its telecommunication infrastructure and targets in adherence to National Digital Communication Policy 2018 and Telegram Right of Way Rules 2016.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 579 1Based on further projection of MNRE,GoI target of 450 GW renewable energy installed capacity by 2030[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 580 In 2019, Delhi had over 57 million telecom connections, of which 54 million were wireless connections provided by both private and public agencies. The public sector (MTNL) constitutes about 46% share of wireline connections and only about 4.3% of the wireless connections.Overall tele-density of NCT of Delhi is substantially higher than the national level average. . Delhi has close to 32 million internet subscribers supported by and extensive network of telecom towers, majority of which are privately managed. Gas Infrastructure: Indraprastha Gas Limited (IGL) is authorized and responsible to lay the network for the distribution of natural gas in the National Capital Territory of Delhi. Natural gas is widely use by transport sector as Compressed Natural Gas (CNG), by the domestic and commercial sectors as Piped Natural Gas (PNG) and by industries as R-LNG supply. The use of natural gases in different forms will considerably bring down the pollution levels in Delhi. Around 25% of total households are connected by piped gas network. However, more than 50 percent of NCT of Delhi has been identified as technically unfit for augmentation of PNG networks by IGL. By 2030, Central Government is targeting to make India a gas based economy thus aiming to push the share of natural gas in energy basket from present 6% to 15%. Delhi shall lay greater emphasis on using cleaner fuels such as PNG & CNG and discouraging the use of polluting fuels. IGL projections indicate that Delhi will need an estimated 7.32 MMSCMD gas volume by 2025 and it is planned to set up 110 new CNG stations by 2025 to meet this demand. Disaster Preparedness and Resilience: Delhi falls in seismic zone IV & V and is extremely vulnerable to natural disasters like earthquakes and floods as well as human induced disasters such as fires, industrial and chemical hazards, floods, building collapses, road accidents, water logging, etc. The city has been experiencing floods of various magnitudes in the past due to floods in the Yamuna and the Najafgarh Drain system. The Yamuna crossed its danger level (fixed at 204.83m) twenty-six times during the last 35 years. Since 1900, Delhi has experienced nine major floods in the years including the recent ones in 1995, 1998, 2010 and 2013. According to Delhi Fire Service statistics, Delhi had more than 75,000 fire incidents during the last five years resulting in more than 1,500 deaths, injuries to more than 7,600 persons and loss of property valuing more than Rupees 176 crores. These incidents include five major, twenty-five serious and ninety-nine medium fires. During the last 5 years, Delhi has also witnessed a 49% increase in the number of fire incidents in JJ colonies and more than 70% of these cases are estimated to arise from electrical causes (mainly short- circuiting). Majority of the building stock in Delhi is characterised by buildings which are unsafe due to rampant unauthorised constructions and non- compliance with building byelaws. Gas leakages and electrical faults have been identified as main causes for fire incidents in Delhi.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 581 The ‘Delhi Disaster Management Plan’ (DDMP) prepared by Delhi Disaster Management Authority (DDMA)has identified and listed the vulnerable areas, colonies, settlements in Delhi for various type of disasters and also recommends periodic safety audits for structural safety, fire safety, electric safety etc., to be conducted by local bodies and concerned agencies to create disaster preparedness for Delhi. In the next twenty years, the infrastructure in Delhi will face an unprecedented pressure and therefore, has to be both responsive to emerging needs and resilient to shocks and stresses. Therefore, the focus is to create a sustainable and resource- efficient environment by enabling provision of robust and resilient infrastructure services. This section gives strategies for water supply and sanitation, sustainable and efficient waste management, clean energy, robust digital, communication and gas based infrastructure, disaster preparedness and resilient Delhi in the following four chapters: INF1 – Making Delhi water secure: water, wastewater and drainage INF2 – Managing solid waste efficiently INF3 – Power, Gas and Telecommunication-Digital infrastructure INF4 – Disaster preparedness and resilience 13.0 MAKING DELHI WATER SECURE: Chapter code WATER, WASTEWATER AND INF1 DRAINAGE 13.1.1 Delhi’s development potential is closely linked to the availability of water. The city is highly dependent on external sources of water and the available quantum is inadequate for meeting future demands. Achieving long-term water security is therefore one of the major focus areas envisaging the following: i) Sustained availability of adequate water that meets prescribed quality standards for fulfilling current and future needs, ii) Improved resilience to flooding. 13.1.2 The plan advocates an integrated urban water management approach and provides inter-connected strategies in the three major water-related infrastructure sectors, namely water supply, sewerage and drainage. While interventions under this approach can incrementally move the city towards being water secure continued efforts shall be made by concerned authorities to procure raw water through inter-state agreements for meeting the city’s requirement. 13.2 Reducing the demand for fresh water 13.2.1 As per DJB service plan, the per capita norms for water supply are to be reduced from 60 GPCD to 50 GPCD by rationalising and earmarking fresh water supply only for potable uses. Water supply shall be reduced further in[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 582 new developments. The demand management strategies to implement this reduction are detailedin this chapter. 13.2.2 Water supply rationalisation to address water scarcity: Water supply in new developments under the various policies of this Plan will be controlled to minimize additional stress on water resources: i) Development within land pooling sectors will be sustainable in terms of water demand and water conservation features shall be built into the sector layout and building design. Per capita water supply shall be restricted to 40 GPCD in land pooling areas (ref: DEV1). ii) Water demand in Green Development Area is anticipated to be met mostly by treated wastewater. (ref: DEV2) iii) Regeneration schemes and TOD Schemes shall receive no additional water supply over and above the existing requirement except for any vacant land/s within the scheme for which additional water supply at 50 GPCD shall be provided. 13.2.3 Treated wastewater for non-potable uses: 100% treatment and maximum reuse of wastewater shall be encouraged in existing developments and mandatory in new developments: i) Decentralised wastewater treatment systems with dual piping shall be mandatory for approval of any new development/ project with discharge more than the minimum threshold as per UBBL. ii) In Green Development Area, it shall be mandatory for all plots/ GDA Schemes to install individual or shared decentralized treatment units irrespective of quantum of discharge. iii) Decentralised treatment units may be installed as a shared facility for single or multiple buildings/plots or for scheme/ sector layout. Built structures created only for installing such facilities shall be free of FAR and ground cover requirements. iv) Shared systems may also be installed at a cluster level for plotted developments or a group of buildings. v) Provision of using treated waste water with separate pipes for potable water supply and for recycled water shall be mandatory for all new developments as per UBBL. vi) Provision of dual piping before providing any new water connections. vii) All existing government, PSP and commercial buildings/plots (except local level facilities) with discharge above the minimum threshold prescribed by UBBL shall migrate to decentralised wastewater management and dual piping in a time bound manner as per feasibility. viii) DJB may facilitate existing residential consumers to migrate to water recycling features. 13.2.4 Low water consumption plumbing fixtures: Installing low water consumption plumbing fixtures as prescribed by the UBBL to conserve water shall be mandatory for the following developments: i) All new developments and regeneration projects. ii) All existing government, commercial and PSP buildings/plots (except local facilities). 13.2.5 All concerned agencies shall encourage citizens and different stakeholders towards adapting water-sensitive behaviour for long term water sustainability.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 583 13.3 Optimizing bulk reuse of wastewater generated in the city 13.3.1 DJB and concerned agencies shall ensure treatment of all wastewater generated in the city as only treated waste water shall be permitted to be discharged into drains or water bodies. This will require augmentation of treatment capacity, maximum collection of waste water through better coverage of unsewered areas, installation of interceptor sewers and implementation of other suitable methods. 13.3.2 DJB shall ensure availability of treated wastewater for maximum reuse and shall prepare a phasing plan for incrementally increasing the wastewater reuse incorporating the following bulk uses: i) Discharge of treated water to the river as per the requirements of environmental flow prescribed by the authorized agency from time to time. ii) Rejuvenation and continuous maintenance of water quality in the various lakes and water bodies of the city. iii) Ground water recharge by using treated wastewater by developing aquifer recharge ponds and lakes in the Yamuna floodplain greenways along natural drains, biodiversity parks and land pooling areas. iv) Usage of treated wastewater for horticulture, irrigation, bus/metro/railway carriage and vehicles cleaning, road cleaning etc., and as far as possible, also for firefighting and construction purposes. Developments within GDA shall also use recycled water in bulk (ref: DEV2). It shall be mandatory to use treated wastewater for industrial processes, and use of potable water shall not be allowed for the same. 13.4 Maximizing retention of storm water 13.4.1 Another important intervention is to reduce storm water runoff and maximise the use of rain water, either directly through storage or indirectly through ground water recharge. 13.4.2 The following strategies shall be implemented: i) In all new developments, large parks and open spaces shall be located in low lying areas to ensure recharge and prevent construction in flood prone sites. ii) Rainwater harvesting shall be permitted as common shared recharge infrastructure in greenfield or regeneration layout plans. iii) Developments within GDA shall be encouraged to create large-scale storage for direct use of storm water for meeting the needs of horticulture. iv) Improvement of pervious surfaces throughout the city by adopting water sensitive urban design (WSUD) principles for all new layout plans and area improvement projects. Elements such as bio-swales, vegetated filters, pervious storm water drains, raingardens, semi- pervious pavements and public parking areas, etc. shall be adopted in public areas as per ground conditions (ref: ENV1 and HCP1). v) The design of storm water networks in new areas shall ensure that at least a proportion of the stormwater is directed/discharged into[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 584 existing/suitable ground water recharge sites. vi) Bio drainage may be used at certain locations to design buffers of rivers, natural drains and lakes to create natural sponges for the city during monsoons. (ref: ENV2) 13.4.3 Strategies for ground water recharge shall be complemented by strict regulation for ground water extraction. Extraction from borewells other than those registered with DJB shall be considered illegal. 13.5 Improving efficiency of water systems 13.5.1 Delhi’s water availability and demand management strategies can be greatly enhanced by bringing in several system improvements which includes: i) Reducing non-revenue water (NRW), adopting 24X7 continuous water supply and smart metering. ii) Providing metered water connection to individuals households in unplanned / unauthorised colonies. iii) Implementing telescopic water pricing to disincentivise irresponsible use of water. iv) In dense colonies, where implementation of sewerage network is not possible, DJB shall set up institutional mechanisms for periodic cleaning of the septic tanks and faecal sludge management. Existing STPs can be used for treatment of sullage and DJB shall set up a mechanism for transfer and treatment of sullage to STPs. The by- products of wastewater treatment shall be suitably treated through post-processing and recycled for road building or any other suitable use. --- x --- x ---- x --- x --- Chapter code 14.0 MANAGING SOLID WASTE EFFICIENTLY INF2 14.1.1 Delhi’s commitment towards sustainable development hinges to a great extent on the ability to conserve its resources and manage waste efficiently. The city generates more waste than it is able to process in an environmentally sustainable manner. This gap needs to be bridged to move from being “wasteful to resourceful”. A common strategic framework has been envisaged for creating sustainable and efficient waste management systems and adopting circular economy principles: i) Substantial proportion of waste managed locally ii) Improved quantum of waste recovered as resource iii) Waste processed and disposed with least environmental impact 14.1.2 This chapter makes separate provisions for both types of solid waste i.e. municipal solid waste (MSW) and non-municipal waste generated in Delhi. 14.2 Managing Municipal Solid Waste locally 14.2.1 MSW is managed by concerned local bodies in their respective areas. Local[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 585 bodies shall fully implement the provisions of SWM-2016 guidelines (and any revisions thereafter) in addition to the recommendations of the master plan. 14.2.2 Managing waste in closest proximity to where it is generated accrues multiple benefits such as better control over segregation of waste at source/locality, better integration of locally active informal waste workers, engagement of local communities and RWAs, MTAs etc., and catalysing circular economy of reuse and recycle. 14.2.3 Creating ‘Minimum Waste Localities’ (MWLs) i) Localities (residential areas, housing societies, colonies, apartments, markets, etc.) where all the wet MSW is managed within their boundaries through eco-friendly solutions such as composting, bio- methanation etc. shall be called MWLs. ii) The dry recyclable MSW generated in MWLs shall be sent to Material Recovery Facilities (MRF) or processing plants located within or in close proximity to the locality. All non-municipal waste i.e. e-waste (electric, electronics, battery waste), biomedical waste, hazardous waste and construction and demolition (C&D) waste etc., shall be sent to government authorised processing centres. Only inert waste, if any, shall be permitted to be disposed at centralised landfill facilities. iii) All new development coming up within Land Pooling, Regeneration Schemes or Green Development Areas shall be developed as MWLs. (ref: DEV1, DEV2, DEV3) iv) All local bodies shall facilitate the transition of existing localities under their jurisdiction to MWLs by involving RWAs, MTAs and local informal waste pickers and transporters etc. 14.2.4 The following strategies shall be implemented to enable creation of MWLs: i) RWAs/MTAs and local communities, in consultation with concerned agencies, may dedicate some portion of large parks (neighbourhood park and above hierarchy) for composting, bio-methanation or any other innovative eco-friendly solution for processing wet waste. ii) Wet waste from properties that are bulk waste generators (hotels, restaurants, malls, etc.) shall be processed and segregated at source within the premises or transported to authorized composting plants. iii) Local bodies shall ensure that waste is collected, managed and treated in closest proximity to its generation in unplanned settlements (including JJ clusters) and. Sites for local treatment shall be identified in consultation with residents/RWAs. iv) To target long-term behavioural change and raise awareness, local bodies may incentivise good practices of sustainable waste management, and collaborate with NGOs, CBOs etc. 14.2.5 Repurposing waste infrastructure: Local bodies shall strategize existing infrastructure and resources to manage maximum quantity of MSW. i) Dhalaos with sufficient capacity and space can be repurposed to serve as Material Recovery Facilities (MRFs) at local level, providing area for segregation of wastes and recovery of recyclables. ii) In the land pooling areas, provision for separate MRFs shall be made. iii) Local waste pickers and ‘kabari valas’ may be engaged by local bodies or RWAs for developing MWLs and leveraging existing recycling[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 586 networks for paper, glass, metal, and plastic. iv) With reduction in the amount of waste being transported, local bodies may incrementally use transportation vehicles for other purposes. 14.3 Minimising environmental impact of MSW 14.3.1 The following measures shall be implemented to minimize the environmental impact of MSW: i) Delhi’s reliance on landfills for waste disposal to be reduced significantly. Existing landfill sites to be incrementally reclaimed as green/recreational areas. Legacy waste at these sites to be salvaged in a phased manner as per the CPCB Guidelines for Disposal of Legacy Waste 2019 (old MSW). ii) Incentives/ disincentives recommended by National Resource Efficiency Policy (NREP)-2019 shall be suitably adopted for Delhi. iii) No new landfill sites shall be permitted in Delhi. All permissible mechanisms for disposal shall be explored and based on assessment of its impact on environment. Any new landfill (if proposed) shall mandatorily adopt sanitary landfilling techniques for disposal of inert waste. iv) Local bodies and private agencies are encouraged to explore and adopt any other innovative environmentally friendly waste processing techniques in the future. v) Littering in public areas and dumping of waste in water bodies, parks, green areas and open land shall be strictly prohibited. 14.4 Management of non-municipal wastes 14.4.1 Non-municipal waste such as e-waste (electric, electronics, battery waste, etc.), biomedical waste, hazardous waste and construction and demolition waste, shall be managed with strict compliance to the rules notified by the Ministry of Environment, Forests and Climate Change (2016). Additional authorised facilities for processing such waste shall be provisioned as follows: i) Medical waste and Common Bio-Medical Waste Treatment Facilities (CBWTFs) should be provided as per requirement. ii) With the coming up of IT/ITES and other digital economies, new technologies such as e-vehicles, the quantum of e-waste is likely to increase, accordingly provision for disposal to be made. iii) The capacity of authorised C&D waste processing plants shall be enhanced and new processing plants may be provisioned wherever feasible. 14.5 Optimizing Waste as a Resource 14.5.1 All agencies involved in waste management shall adopt principles of reduce, reuse and recycle (circular economy), consider waste as a resource and facilitate an environment for development of waste-related industries. i) Use of C&D recycled products shall be mandated in accordance with C&D waste Rules- 2016. Reuse of C&D waste generated on site for all redevelopment projects and use of recycled C&D products in all new development projects shall be mandatory to the extent possible.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 587 ii) Large scale composting farms shall be encouraged in the notified Green Development Area (GDA) for composting of bio-degradable waste. The compost may be utilized within GDA or rest of the city for various green uses. iii) Recycled waste products and compost that meet quality standards may be promoted by the concerned agencies for a robust waste to wealth eco- system in Delhi and the region. --- x --- x ---- x --- x --- 15.0 PROVISION OF POWER, GAS, Chapter code TELECOM AND DIGITAL INF3 INFRASTRUCTURE 15.1.1 Delhi needs to build world class digital network infrastructure and shift to clean energy to become a sustainable city and enhance its global competitiveness. The following have been envisaged in this regard: i) Enhanced production and increased use of renewable energy. ii) Robust and adaptable city-wide digital infrastructure and connectivity. iii) Improved infrastructure for power and gas. 15.2 Shifting to renewable energy and efficient power consumption 15.2.1 In light of global warming and climate change, it is imperative to develop a plan to enable the transition from conventional sources such as fossil fuels towards clean energy sources. 15.2.2 A Renewable Energy Plan shall be prepared for Delhi to identify potential renewable energy generation areas within Delhi along with strategies and projects to meet the targets outlined by Ministry of New and Renewable Energy, Government of India. 15.2.3 Delhi has a high potential for generation of solar energy, therefore, the following strategies maybe adopted for scaling up the production of solar energy in Delhi: i) Solar farms shall be encouraged in the ‘Green Development Area ’in line with “The Agriculture-cum-Solar Farm Scheme” of Delhi. Power purchase agreement based models may be adopted to incentivise landowners to set up solar farms on their agricultural lands. (ref: DEV 2) ii) Delhi has a number of canals that can be utilised for harnessing solar energy as per feasibility. The canal owning agencies may leverage this potential for generation of solar energy. iii) Government buildings and institutional campuses with a roof top area above 500 sq.m to install solar PVs as per Delhi Solar Policy 2016 and Net Metering Regulations, 2014. iv) Large scale public facilities such as airports, metro stations, railway stations, inter-state and city-level bus stations/depots, stadiums etc.,[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 588 may progressively meet majority of their power requirements through solar and other renewable energy. v) Any excess power generated (after meeting on-site requirements) may be fed into the grid, 15.2.4 The following strategies may be adopted to enhance the usage of solar energy in buildings and public spaces: i) Solar-based LED lighting to be used for roads, parks and public places. These shall be implemented as part of area improvement projects by concerned agencies such as Walk Plans and MMI. ii) Installation of solar PVs shall be encouraged in all plots with roof area more than 100 sq.m and solar assisted water heating shall be promoted as per UBBL. Installation of the same to be made mandatory for all new constructions and linked to building permissions. iii) DISCOMS shall undertake installation of smart meters in a phased manner for all existing buildings, and mandatorily for all new constructions. iv) The practice of differential pricing for power supply may be adopted by DERC to encourage increased solar usage during peak hours, to reduce the peak load and improve system efficiency. 15.2.5 Modular star rated electrical appliances and electrical fixtures to be mandated in buildings for higher energy efficiency. 15.2.6 Thermally comfortable and energy-efficient buildings shall be promoted according to the UBBL and Energy Conservation Building Code 2018. The following shall be considered while planning and designing of projects: i) Climatology, wind flow, drainage, presence of water body in close vicinity.. ii) Development of green blue green features within plots for all new developments (ref: ENV2). iii) Existing buildings may be retrofitted in order to improve their thermal comfort. Retrofitting may include provision of shading, ventilation, insulation etc. 15.2.7 All concerned agencies may adopt the following strategies for managing peak load demand: i. promote mixed use, ii. permit select commercial/ recreational spaces to function for 24 hrs and promote night economy. iii. Setting up large public screenings of sporting and other events etc. iv. Examine feasibility of shared heating and cooling systems v. Use vacant office building/ schools etc., for night parking and EV charging. vi. Promote EV battery swapping during peak hours and permit EV charging only during non-peak hours. 15.2.8 All concerned agencies and departments, DISCOMS, EE&REM and BEE to run awareness campaigns to sensitize the construction community and the end-users towards the environmental and economic benefits of using solar panels. 15.3 A digitally enabled and connected city[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 589 15.3.1 Delhi requires adequate infrastructure provisions to support higher service levels like network of 5G and above, full city fibre coverage, and integration of city’s digital systems with IoTs (Internet of Things), Artificial Intelligence (AI), Cloud Computing and Big Data etc. for effective urban management of Delhi. 15.3.2 With increased level of digitalization, data centres may be setup to meet the need for data storage, server management, etc. Such data centres may be developed by public and/or private agencies as per norms. 15.3.3 Digitally unified command and control centres may be set up by the local bodies as key drivers for effective urban management, especially traffic, safety, disaster response etc. 15.3.4 Connectivity through fibre-optics is considered to be more efficient in terms of internet speed and reliability of services. “Fibre First Initiative” of NDCP 2018 and regulations of ROW Policy 2016 will facilitate augmentation of telecom infrastructure. Implementation of optic fibre shall be through collaborative models involving state government, local bodies and private sector as required for provision of shared telecommunication infrastructure. 15.3.5 Smart poles may be installed in public areas, comprising of CCTV cameras, air pollution monitoring sensors, telecom antenna, Wi-Fi hotspots/ microcells, solar lighting, public address and messaging systems, emergency call box etc., which shall be connected to the digital systems of city agencies. 15.4 Improving infrastructure for power and gas supply 15.4.1 Power Infrastructure: i) Major transmission network to be planned within the RoW of proposed master plan roads as per feasibility and shall adhere to safety norms of overhead and underground transmission lines as per norms prescribed by CEA . ii) All new sub-stations in Delhi to be developed as gas insulated sub- stations as per feasibility, as roughly 50% lesser land area is required as compared to traditional air insulated sub-stations iii) All new 11KV power lines to be integrated underground within the road cross sections of land pooling zones as per technical and financial feasibility. 15.4.2 Digital and Telecommunication Infrastructure: i) Optic fibre is a public utility and space for this has to be provided in all street sections of12m RoW and above as per feasibility. On streets less than 12m, optic fibre cabling shall be laid within the street section wherever possible or retrofitted as per existing conditions. ii) Telecom installations and associated in-building solutions to be promoted in all new buildings and development. 15.4.3 Gas Infrastructure: i) Future gas pipelines to be integrated within RoW of 12m and above. ii) Provision of piped gas connections at household level to be promoted for all new buildings and developments.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 590 --- x --- x ---- x --- x --- 16.0 DISASTER PREPAREDNESS AND Chapter code INF4 RESILIENCE 16.1.1 Delhi has to develop resilient systems that can withstand, respond to, adapt and recoverin the event of unpredictable disasters, shocks, chronic stresses. Like any other megacity, Delhi also faces a wide range of varied risks such as climate change impacts, earthquakes, fires, floods, disease outbreaks, pandemics, and other threats. 16.1.2 In Delhi, the impact of such risks increases manifold when coupled with the intrinsic issues such as presence of a large number of dense unplanned areas with dilapidated or poor building stock and high densities. This makes a large part of Delhi highly vulnerable to disasters as these areas are likely to bear large losses in terms of life and property at the time of any such event. 16.1.3 The plan aligns with the state and national regulations on disaster mitigation and preparedness and takes a three-pronged approach in terms of reducing risks and vulnerabilities: mitigating the impact, being prepared to respond to disasters by building state of the art resilient infrastructure and systems, and facilitating an aware citizenry. Delhi will become future ready and resilient by striving for: i) Enhanced resilience for natural disasters- specifically earthquakes ii) Reduced vulnerability from fires and urban floods iii) Improved ability to respond to all types of disasters and risks 16.2 Building resilience and preparedness for natural disasters 16.2.1 Reducing Seismic vulnerability: Delhi is located in the national seismic Zones IV and V, in which, earthquakes can cause ‘high damage’. The city sits on two fault lines, namely Mathura and Delhi-Moradabad fault lines. Delhi Disaster Management Authority (DDMA) has prepared seismic micro-zonation for Delhi and identified high, medium and low risk zones. In order to reduce vulnerability and minimize the damage to life and property caused by earthquakes, following strategies can be adopted: i) Dedicated Structural Audits to be carried out across the city, and all buildings in Delhi shall duly undergo audit as per the dedicated protocol/s established by DDMA and concerned local bodies. ii) The structural/safety audit as defined by Government of India shall be prioritized in high risk zones, vulnerable localities, public buildings with high footfall, buildings with response units (fire, police, integrated control centres etc.), and essential infrastructure. iii) The safety audit protocol shall provide details of procedure and parameters for the audit, frequency of the audit and information for strengthening and retrofitting buildings. iv) In case of buildings and infrastructure, for which strengthening and retrofitting has been recommended by the audit, compliance shall be ensured. v) Structural design of all new buildings and structures shall adhere to the guidelines for seismically compliant buildings as per UBBL.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 591 vi) Base isolation, hydraulic dampeners and other such structural features may be adopted by concerned agencies to make critical infrastructure of transport, water, fuel etc., seismically resilient. vii) Concerned agencies may identify areas/localities that are at risk of incurring tremendous damage in the event of a natural disaster. Such areas may be facilitated to undergo mandatory retrofitting or redevelopment to ensure safety of the residents. Regeneration Schemes proposed in high risk zones may be given priority over other projects by concerned agencies. 16.3 Reduced vulnerability from other disasters 16.3.1 Reduced risk from fires: Industrial, commercial units and households in dense settlements are highly susceptible to the hazard of fire. In order to minimize fire risk in the city: i) All buildings with functions involving highly inflammable material shall get mandatory clearance from the Fire Department and adopt safety precautions. Mixing of such uses with residential or PSP functions shall not be permitted. ii) The Delhi Electric Vehicle Policy, 2020 by GNCTD, for promoting electrical vehicles needs to be reinforced with clear guidelines regarding storage, charging, use, and disposal of EV batteries, which are a potential fire hazard. iii) The Delhi Fire Services can adopt the use of mobile fire hydrants and other state of the art fire-fighting gear, in areas where fire tender cannot reach. iv) Buildings identified as ‘vulnerable to fire’ by DDMA and concerned agencies shall be retrofitted with fire prevention and mitigation measures as per UBBL and norms of the Delhi Fire Services. v) Department of Power, local bodies and other concerned agencies shall take joint action to ensure electrical safety in identified vulnerable areas in a phased manner, by ensuring safety from electrical faults in buildings. Area level fire safety shall also be ensured especially in the Walled City, urban villages and other dense areas by taking care of exposed overhanging wires and cables in the streets. 16.3.2 Reduced incidences of urban flooding and water logging: The frequency and intensity of urban flooding and water logging has been on a steady rise in Delhi, due to rapid urbanisation. This is likely to worsen due to climate change impacts. Strategies for augmenting the green cover and water-sensitive urban development - shall be taken up. Additionally, the following strategies shall be adopted: i) All natural and engineered drains shall be kept free of obstructions and encroachments with regular desilting and disposal of silt of drains. ii) Local bodies may earmark certain parks and gardens in flood prone areas to serve as flood detention sinks as identified in the Drainage Master Plan of the I&FC department.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 592 iii) Large-scale storm water capture projects in the Yamuna floodplain shall be undertaken by concerned agencies, with the dual objective of flood control and trapping fresh water for augmenting supply. Such projects shall ensure strict environmental compliance and cause no damage to the river. 16.3.3 Reducing vulnerability to pandemics: i) Mixed use development and vertical mixing of compatible uses within plots shall be promoted in the city, facilitating availability of all services, work centres and homes within close vicinity of each other. This will facilitate self-sufficient isolation zones as required. ii) Decentralised workspaces shall be promoted in the form of co-working spaces, shared workspaces within slum rehabilitation projects, support for home-based work, etc. Additionally common community spaces shall be promoted to be utilised for providing refuge spots, common kitchens, quarantine spaces etc., at the time of emergency. iii) Development of large green areas, mandatory creation of open areas, public spaces and plazas in new developments, and reducing built densities through planned regeneration will support requirements of social distancing during pandemics, while providing an active public realm during normal times. iv) Development of adequate affordable rental or ownership housing options for the poor, worker housing, hostels for women and men, etc. shall be promoted to reduce crowding within dwelling units and support migrant housing in the city. v) The plan facilitates creation of multi-facility plots (particularly in dense unplanned areas) that can be used temporarily repurposed along with other government facilities during times of disaster. vi) Better habitat design and green rated developments shall be promoted to reduce the dependence on mechanical ventilation systems, which pose a threat during air-borne epidemics. 16.4 Managing effective response to disasters and risks 16.4.1 DDMA may set up a state of the art ICT enabled Delhi Disaster Response Force (DDRF) for effective response at the time of a disaster or an unpredictable event. This force can be supported by government departments and agencies as well as hospitals, CSOs etc. This force shall carry out regular risk assessment exercises, receive and transmit early warning signals, converge all necessary protocols to be followed at the time of occurrence and activate all response systems. i) A disaster response protocol shall be developed for Delhi, outlining the procedure to be followed for different types of disasters. ii) All service providing agencies shall develop emergency response plans and guidelines to ensure that there is minimal impact on delivery of these essential services during times of disaster.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 593 iii) Dedicated evacuation spaces and refuge spots for residents shall be designated in all localities, especially in dense areas. a) Evacuation spaces to be open to sky areas where people can gather at the time of an event such as fire, earthquake etc. These can be parks, multi-purpose grounds, other open spaces etc. b) Refuge spots can be any internal spaces identified by RWAs/ local bodies to provide alternate locations for unhealthy/unwell residents at the time of contagious disease outbreaks. Such spots should be publicly accessible facilities. iv) DDMA shall also develop a post-disaster rehabilitation strategy. All departments of GNCTD, local bodies and DDA shall develop a system for regular assessment of disaster risk for Delhi. --- x --- x ---- x --- x --- VOLUME 2 FRAMEWORK FOR SPATIAL DEVELOPMENT AND PLAN MONITORING SECTION 7 SPATIAL DEVELOPMENT FRAMEWORK This section provides detailed ‘spatial Development Policies’ that will guide the future development of Delhi over the plan period in greenfield as well as brownfield areas. Four major policy areas shall be covered as follows: DEV1 – Development of new areas through Land Pooling DEV2 – Development within Green Development Area DEV3- Urban Regeneration DEV4- Transit-oriented Development[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 594 17.0 DEVELOPMENT OF NEW AREAS Chapter code DEV1 THROUGH LAND POOLING 17.1.1 Land Pooling is a new paradigm for urban development, wherein the private sector will play an active role in assembling land and developing physical and social infrastructure. Owners or groups of owners will pool land parcels for development as per prescribed norms and guidelines, making them partners in the development process. For integrated planning of a sector, the land required for development of roads, utilities, greens and other infrastructure shall be made available to DDA and service providing agencies as per approved/notified plans. Such areas are envisaged to be world class, ‘smart’ and sustainable neighbourhoods, sectors and zones, planned and executed as per the availability of water, power and other infrastructure. 17.1.2 Regulations in this regard provide further details for development of such lands and the process for the same. 17.2 Applicability 17.2.1 The policy shall be applicable in identified land pooling areas as notified by DDA/Government from time to time, except: i) Green Development Area ii) land under unauthorized colonies (which are yet to be regularized); iii) built up Lal Dora areas (abadi), notified extended Lal Dora of villages; iv) lands under litigation including lands under acquisition proceedings, till the case is settled; v) land where DDA or any other government agency has issued NOC, or where the plan stands approved for development by any other government agency at the time of notification of this policy and its regulations; vi) land under notified forests/government land (use undetermined) and any other scheme of Government of NCT of Delhi for which change of land use is under process under Section 11(A) of the Act at the time of notification of these regulations; vii) pre-existing institutions which have been considered for regularization or are still under examination by the Government; viii) land under roads natural drains, natural water bodies, heritage sites, flood and irrigation department, railways and airport. 17.2.2 If any of the landowners who have lands listed under sub-clauses (ii) and (vii) above wish to participate, they must clear all encumbrances before expressing their willingness. 17.2.3 All remaining lands, other than those mentioned in Clause 17.2.1, shall form the “Developable Area” that can be taken up for pooling.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 595 17.3 Guiding Principles 17.3.1 Pooling of land shall be done on the basis of delineated sectors (as defined in the Regulations) and the required modification in the Zonal Development Plan shall be based on the approved Sector Plan as per the provisions of MPD. 17.3.2 Landowners with any size of land in identified land pooling areas may register and express their willingness to participate as per the application process specified in the Regulations. 17.3.3 A minimum of 70% contiguous land of the developable area within the sector, free from encumbrances, shall be pooled to make the sector eligible for development. This will ensure unified planning, servicing and subdivision/share of the land in a sector. When such minimum contiguity is achieved in a sector, DDA shall intimate all the constituent landowners forming part of the contiguous land in the sector to form a consortium. Isolated land parcels of 2 ha and above falling in a sector, that are not a part of 70% contiguous land shall also be eligible for being part of the Consortium provided they can be integrated with the sector layout. 17.3.4 Of the pooled land, the Consortium will retain maximum 60% and hold the remaining minimum 40% on behalf of DDA, to be surrendered (free of encumbrances) to DDA/ service providing agencies, as and when required, for development of city level physical infrastructure, recreational, industrial and public/semi-public (PSP) facilities as per the norms of this plan. Each landowner will surrender land proportionate to the area of land pooled, for provision of such facilities. 17.3.5 The 60% land shall be utilized by the Consortium for development of residential, commercial, public and semi-public facilities and physical infrastructure. 17.3.6 The Consortium will mutually decide a formula for redistribution of developed land/ built space, or any other form of fair exchange as part of an “Implementation Plan” and convey the same to DDA with the consent of all landowners. 17.3.7 The final development of the 60% land shall be taken-up by the Consortium only after obtaining the necessary approvals. The 60% land can also be developed as separate sub-projects by those landowners/ group of landowners who have chosen to work as separate Developer Entities (DEs), only after the overall integrated planning has been completed by the Consortium and all due approvals have been obtained. The DE can be: i) An individual land owner who has pooled one or more parcels of land in the sector, adding up to a minimum of 2 ha; ii) A group of land owners who have collectively pooled one or more land parcels adding up to a minimum of 2 ha who have voluntarily grouped together, through a valid and legally enforceable agreement for taking up development; iii) An entity (developer/business/corporate entity) representing a group of[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 596 landowners who have pooled one or more land parcels adding up to a minimum of 2 ha, through a legally binding agreement. The limit of 2 ha has been set to ensure adequate return of land for development. 17.3.8 Adequate provision of EWS housing shall be ensured in the new development area and provided as per MPD. 17.3.9 External Development Charges (EDC) shall be applicable on the entire area of pooled land to cover the actual cost of providing city-level infrastructure. 17.3.10 Land parcels in a sector that remain un-pooled may be allowed to develop at a later stage subject to: i) Workability of the proposed layout plan in terms of accessibility and other functional requirements. ii) Making 45% land available for city level infrastructure/facilities or as determined by the Authority from time to time. iii) Payment of updated applicable EDC for infrastructure and services. 17.4 Role of DDA and/or Government 17.4.1 Ensure smooth and fair implementation of the Policy. 17.4.2 Delineation of sector boundaries and overall planning of the land to be utilized by DDA and service providing agencies for provision of city level physical infrastructure, recreational, industrial and public/semi-public (PSP) facilities. 17.4.3 Facilitation of the entire process of planning and development by DEs/Consortiums through a Single Window System for application, verifications, approvals, licenses, etc. in a time bound manner, as specified in the Regulations. 17.4.4 Overall monitoring of provision of relevant infrastructure for water supply, sewerage, drainage, power, transportation etc., by service providing agencies in a time bound manner. 17.4.5 Acquisition of any land, which has not been offered under Land Pooling and is required for effectuating development in any sector, in accordance with law. The cost of such acquisition shall be borne by the DEs/Consortiums. 17.5 Role of DE/Consortium 17.5.1 A Consortium of constituent landowners will be created for unified planning, servicing and subdivision/ sharing of the land or any other defined action for development of sectors under land pooling as per prescribed norms and guidelines. 17.5.2 Development and finalization of the Implementation Plan with the approval of all constituent landowners as per Clause 17.3.6.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 597 17.5.3 Preparation of layout plans and detailed site plans for the 60% land as per the Planning norms, through a consultative process involving all DEs/ landowners. 17.5.4 Undertaking watch and ward of the land to be surrendered (free of encumbrances) to DDA/ service providing agencies, as and when required. 17.5.5 Timely payment of External Development Charges (EDC) to DDA and service providing agencies towards the cost of developing public infrastructure and services, through the Single Window System and as per timelines specified in the Regulations. EDC shall be payable on the total pooled land. 17.5.6 Seeking necessary approvals of layout plans, detailed site plans and other drawings, through the Single Window System established by DDA. 17.5.7 Time bound development of all internal roads and other related infrastructure such as water supply lines, power supply, rain water harvesting, sewage treatment plant, and parking, including provision of multi-level parking facilities wherever required, falling in its share of the land 17.5.8 Time bound development and maintenance of the entire development as per approved layout plan, including all the local level facilities i.e. open spaces, roads and services, till the area is handed over to the concerned Local Bodies for maintenance. The deficiency charges, if any, shall be borne by the DEs/Consortiums at the time of handing over of the services to the local bodies. 17.5.9 Time bound transfer of the share of built-up space/land to constituent landowners/DEs as mutually agreed in the Implementation Plan. 17.5.10 Ensure development of the prescribed built-up space/dwelling units for EWS Housing component as per provisions of this Plan. Sale and Disposal of EWS housing stock shall be as per the Plan. 17.5.11 Bearing the cost of acquisition of land acquired by DDA as per law for the public purpose of ensuring the planned development of infrastructure in the Zones and Sectors where the Land Pooling Policy is applicable. 17.6 Development Norms 17.6.1 The following conditions shall apply for development: i) A minimum of 40% of pooled land in every sector shall be reserved for city level infrastructure and other use (surrendered to DDA and service providing agencies, as and when required). DDA’s share of Industrial and PSP land use (refer table 17.1) in sector shall be allowed to be clubbed with adjacent sectors to meet the requirements of providing city/zonal level facilities. A maximum of 60% of pooled land in every sector shall be available to DE/Consortium for development. The distribution of land uses shall be as follows: Table 17.1 Distribution of land uses in Land Pooling areas Area of Pooled Land Land Use Minimum 40%* Maximum 60% Gross Residential -- 53% Commercial -- 5% Industrial 4% -- Recreational 16% -- PSP 8% 2% Roads and circulation 12% --[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 598 * The 40% of land in each sector can be utilized for any use as per the requirement. There shall be no bar for DDA to use fix percentage in a particular sector. However, the overall percentage of a zone will be as per the table above. 17.6.2 Division of Gross Residential areas and provision of facilities shall be as per norms in the Plan. Land requirements for provision of internal roads/ infrastructure/ services (including water supply lines, power supply, rainwater harvesting, STP, etc.) as earmarked in the layout plan will be met equitably by all the landowners/DEs. 17.6.3 50% of the plots earmarked for local level health and education facilities, within the Gross Residential Use (53%) in a sector, to be returned to DDA for allotment to government agencies/ departments. 17.6.4 Amalgamation and sub-division of city level PSP plots as well as commercial plots shall be permitted. Minimum area requirements as per the Plan shall be applicable for development of any use premise. The DE/Consortium may also adopt innovative ways for achieving a vertical mix of uses (residential, commercial, PSP and industrial) within a building. 17.7 Additional Development Controls 17.7.1 Variance in Applicable FAR at Sector Level: i) The prescribed FAR limit for different land uses at sector level shall be computed as per the table below: Table 17.2 FAR limit for different land uses at sector level S.N. Land Use FAR Total area that can be built as per FAR* 1 Residential 200 200 x Net residential land (Net Residential land to be a maximum of 55% of Gross Residential land on which a mix of Group Housing and Plotted Housing typology is allowed on fulfilling the layout and plot level controls as per Clause 17.7.4 and 17.7.5.[A] 2 Commercial 150 150 x 5% of pooled land [B] 3 PSP 225 225 x 10% of pooled land [C] 4 Industrial 200 200 x 4% of pooled land [D] Total area that can be built as per FAR at sector level [T]= A + B + C + D * Notes: a) In addition, mandatory FAR of 15% over and above the maximum permissible residential FAR shall be available to the DE/Consortium only for provision of EWS Housing. EWS requirements to be calculated for the entire permissible residential FAR (irrespective of housing typology); b) Permissible FAR for social infrastructure and utilities (up to local level to be provided under gross residential component) shall be calculated over and[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 599 above the residential FAR on the basis of population norms of MPD; c) Distribution of PSP land use between Consortium/DE and DDA shall be as per Table 17.2. PSP plots shall avail the FAR as per the prevailing Master Plan provided that the total PSP FAR in the sector does not exceed [C] mentioned above. and TDR, if applicable ii) FAR loading can be varied across different plots without exceeding the total applicable FAR for a sector except in sectors where TDR will be utilised, whereby higher FAR can be utilised along major roads, around identified transit stations or other identified locations. iii) In case there is a shortfall/variation in return of 60% land to the Consortium due to site conditions or planning considerations, the Consortium/DEs shall be permitted to utilise their respective FAR. iv) Gram sabha lands shall be integrated into the overall layout plan for the sector. Utilisation of such lands shall be as follows: a) DDA may participate in the land pooling as a Developer Entity; (part of developable area) b) DDA may develop such lands to meet specific needs/gaps of respective sectors. In such cases they shall not be considered part of the pooled land for computation of FAR as per table 2and shall be developed for different use premises as per norms. (not part of developable area) 17.7.2 Variance in applicable FAR shall be permitted through the following options: i) Exchange of land uses within sectors: a) For Consortiums– sector-level Commercial and/or PSP area under its share can be increased up to 30% each with an equivalent reduction in total area that can be built as per Residential FAR. b) For DDA an exchange of up to 30% shall be permitted between sector- level PSP and Industrial area under its share; ii) Utilisation of TDR shall be permitted only in the identified TDR receiving areas. 17.7.3 Mix of Uses/Vertical Mixing: i) Vertical mixing (VM) of identified land uses shall be allowed within plots and buildings to enable mix-use in building typologies and hubs, to create innovative green layouts and facilitate the provision of adequate public facilities. The controls and mix of uses for VM shall be as follows: a) Mix of uses/VM shall be permitted in approved VM plots, identified in the sector Layout Plan, where the overall FAR on such plots shall not exceed 400. b) The loading can be in the form of same land use or identified compatible land use/s as per sub-clause (g) below. c) Mixing of identified uses is permitted in any proportion in the form of different buildings within a plot, or vertical mixing of floors within buildings or both. d) Requirements w.r.t open spaces, facilities, parking, entries/ exits and service cores, etc. within the identified plot shall be as per norms of the Plan or applicable regulations.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 600 e) Separate entry/exits and service cores shall be provided for each use. Additional requirements, if any, due to utilisation of TDR shall be fully met within the plot itself. f) Mixing/ Vertical Mixing of recreational parks, hospitals, health facility, university campuses, utilities, fuel stations and correction/ penal facilities of any kind shall not be permitted. g) Mixing shall only be permitted for compatible uses as follows:  Non-manufacturing industries like service industry (IT/ITES, BPO/KPO, etc.), packaging and logistics, and non-polluting MSME units can be combined with PSP and commerce.  Schools can only be combined with residential use premises. Other educational institutions can be combined with clean industries such as those mentioned above. h) Surplus land (if any) due to use of VM shall be utilized for active greens such as urban farming, nurseries, gardens. 17.7.4 Layout Controls in land pooling sectors i) Layout Plan shall indicate the following: a) use zones/ use premises as per the Plan. b) redistributed plots returned to DE/Consortium , and c) VM plots, mix of uses and respective FAR for all individual redistributed plots at the sector level. ii) Applicable FAR and other controls of various use premises falling under Residential, Commercial and PSP and industrial land use and VM Plots shall be as per Plot level controls laid down in Clause 17.7.5 and it shall be ensured that the cumulative area that can be built for all the plots does not exceed the permissible limits set out in Clause 17.1.1 except in sectors where TDR is being utilized. iii) Isolated land parcels of 2 ha or more shall have a minimum access of 18m RoW for inclusion in the layout plans of the sector. iv) EWS block requirements shall be met by DEs individually or developed as a separate area/s on a consolidated basis, preferably close to transit stations. v) At least 15% of the residential FAR (A) in the Sector as per Clause 7.1 shall be utilized for development of small format dwelling units of 40- 60 sq.m. vi) Local level facilities shall be provided in the form of separate plots as per norms of the Plan, or within Group Housing plots. Where such facilities are within Group Housing plots: a) FAR for the facilities will be over and above residential FAR of 200. b) Any open space requirements for such facilities as per master plan shall be provided within the plot. vii) Road Layout a) The sector road network shall incorporate the road hierarchy and[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 601 Street Design Regulations of the Plan. Cycling and walkability network shall be a mandatory requirement. b) All major roads (24m and above) shall be provided with underground utility ducts for accommodating trunk services. c) At least 50% of the area under collector roads shall be developed with minimum 24m RoW. d) Existing revenue roads and phirni roads acting as major movement corridors within a sector shall be improved and/or widened and integrated into the sector layout, if feasible. e) Direct vehicular or parking entries/exits shall be avoided on roads of 24m RoW and an alternative vehicular access to be developed as part of layout. f) The new development shall maintain continuity with existing movement networks of approved or built planned development. viii) Buffers: In addition to all other mandatory buffer requirements, the Consortium/DEs and public agencies shall maintain buffers along major natural drains as per DCN. a) Such buffers shall be used for developing parks of various hierarchies or the edges shall be protected by providing pedestrian/cycling streets. b) Buildings on the edges of buffers of natural drains shall maintain active facades in the form of balconies, windows, pedestrian entries, shop-fronts, plazas, etc. facing towards the buffer. ix) Public Plazas: The layout shall incorporate public plazas of various scales to improve the availability of public spaces. Development of plazas shall be regulated as follows: a) Public plazas of minimum 2000 sq.m shall be planned at all major intersections of arterial-to-arterial roads as part of the sector Layout Plan. b) All mass transit stations shall provide 20% of the plot area as a single open access public plaza for spillover of passengers and Multi Modal Integration. c) All plots above a size of 1 ha shall also provide 10% of the plot area as mid-street or corner public plazas. FAR for the area under such plazas given within plots, shall be loaded on the remaining plot. x) Active Frontage: a) Active frontage shall be maintained along roads with RoW of 24m or more. b) A setback of 3m shall be maintained with greens and tree plantation, with built-to-edge development for 70% of the building edge. At least 50% of such built-to-edge frontage shall be kept active on the ground/podium floor by using arcades, colonnades, shop-fronts, pedestrian entries, plazas, etc. c) These requirements will only be applicable on commercial, industrial and PSP plots as well as VM plots;[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 602 xi) Sustainability features: a) All projects within land pooling areas shall achieve mandatory Green Blue Factor of 0.2 (refer DCN). b) Physical infrastructure in the Sector shall ensure the following:  100% treatment and maximum reuse of treated wastewater  Segregation and 100% reuse of green waste;  Meeting 10% of the sector’s energy demand through renewable sources like solar;  Optimum retention of storm water for direct reuse and recharge of groundwater as per applicable norms. Multiple sectors/schemes may come together to meet these sustainability requirements. 17.7.5 Plot and Building Controls i) The following controls will apply for different kinds of plots outlined below: Controls Residential plot – Residenti al PSP/Comm VM Plot plotted housing plot – group ercial/ housing Industrial Plots 1 Minimum plot - Only cluster area developments on minimum land of 5000 sq.m permitted* - Sizes of plots shall As per norms of range between 100- the Plan for 300 sq.m 3000 sq.m various use 5000 sq.m - EWS units to be premises provided as separate block either within the cluster or jointly with other DEs 2 Maximum As per MPD, provided the 200 As per norms 400 FAR overall FAR for the cluster for various use (i.e. 200) is not premises exceeded** 3 Maximum As per MPD Up to 33% As per norms Up to 50% ground for various use coverage premises 4 Mandator y - Not permissible on RoW 18m RoW at As per norms of - Collector road of road of 18m and least on the access above one side Plan for 24m or - Overall cluster to have various use above at access from min 12m premises least on one road. Individual Plots side may be provided - Mandatory access from 9m road. alternate access from 12m RoW[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 603 5 Setbacks As per MPD 1. As per MPD for different Plot Sizes of respective land uses. 2. For Plots on 24m ROW and above, Front setback shall be as per Clause 17.7.4(x). 3. Side and Rear setbacks shall be subject to requirements of height and ventilation as per building bylaws/ NBC. * All facilities, local access roads and decentralised infrastructure for solid waste and wastewater management shall be accommodated within the cluster development. **In case the computed built area for a plot is less than that permitted in a lower category plot, the maximum built area of the lower category shall be permitted. --- x --- x ---- x --- x --- Chapter code 18.0 DEVELOPMENT WITHIN GREEN DEV2 DEVELOPMENT AREA 18.1.1 The Green Development Area (GDA) Policy provides an integrated framework for development in the following areas of Delhi: i) Green Belt – land along the NCT of Delhi boundary up to a depth of one peripheral revenue village boundary, wherever possible. ii) Low-Density Residential Area (LDRA) – Area of the villages notified for low density development and having concentration of farmhouses, termed as Low- Density Residential Plots or LDRPs. 18.1.2 The Policy will encourage ‘green development’, which shall be characterised by lower FAR and large wooded and landscaped areas, to: i) foster city-level hubs for green living and recreation, create green jobs and economies, ii) encourage production of food and other natural produce to improve food security and meet horticultural needs. iii) create a regional environmental buffer, reduce impacts of air pollution, urban heating, improve predictability of rainfall and combat threat of desertification. 18.2 Applicability 18.2.1 The extent and boundary of GDA shall include the areas of villages notified as Green Belt and LDRA. However, the extent and boundary of GDA may vary based on actual delineation on ground. 18.2.2 All existing and future development shall be governed by the provisions of GDA, superseding the earlier provisions for Green Belt and LDRA. 18.2.3 The Policy shall not be applicable in the following areas: i) Land under unauthorized colonies (which are yet to be regularized);[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 604 ii) Land under litigation including lands under acquisition proceedings, till the case is settled; iii) Land parcels falling in built up Lal Dora areas (abadi), notified extended Lal Dora of villages; iv) Land where DDA or any other government agency has issued NOC or where the plan stands approved for development by any other government agency at the time of notification of the GDA Regulations; v) Land/ property where a court order has been issued for eviction/vacation of premises in favour of Government or DDA or local bodies; vi) Land falling within protected monument/area under the provisions of the Ancient Monuments and Archaeological Sites and Remains Act, 1958 as amended from time to time; vii) Land under notified forests/government land (use undetermined) and any other scheme of Government of NCT of Delhi for which change of land use is under process under Section 11(A) of the Act at the time of notification of the GDA Regulations; viii) Pre-existing institutions which have been approved or considered for regularization or are still under examination by the Government; ix) Land falling within the RoW of approved and notified infrastructure such as existing/proposed master plan roads, major trunk water supply and sewage lines, HT lines, transport and other essential infrastructure; x) Land under natural drains, natural water bodies, heritage sites, flood and irrigation department, railways and airport; xi) Farmhouses falling in notified forest land or in regional park area (other than farmhouses built on privately owned land in the regional park sanctioned up to 07.02.2007 subject to orders of Supreme Court of India in this regard). Landowners of lands listed under Clauses (i) and (ii) above may participate under this Policy only after clearing all encumbrances from the land. 18.3 Guiding Principles 18.3.1 Provide a comprehensive framework defining permissible uses, activities / mix of activities and FAR for proposed uses / activities / mix of activities for green development. Mixing of these uses/ activities shall be permitted. 18.3.2 Provide environmentally sustainable development options to enable the land owners to achieve the economic value of lands. 18.3.3 Provide connectivity and infrastructure for physical and functional integration of the areas within and around GDA. 18.3.4 The activities permitted within GDA, shall be with the prescribed FAR and Mandatory Wooded Area. 18.3.5 Three grades of green development shall be permitted in the GDA as per Clause 18.4.1.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 605 18.3.6 Development of land within the GDA shall take place through private initiative on individual plots or larger scheme areas pooled by constituent land owners. 18.3.7 Trunk Infrastructure shall be developed as follows: i) DDA/ Service Providing Agencies (SPA) can develop infrastructure against payment of EDC by landowners. ii) Private entity can develop infrastructure on the basis of plan approved by DDA/Service Providing Agencies (SPA). 18.4 Applicable Norms 18.4.1 The following grades of development shall be permitted: Table 18.1: Grades of development permitted in GDA Grade - 1 Grade - 2 Grade - 3 A. Permissibility 1.Minimum Land min. 600 sq.m 4000 sq.m 10,000 sq.m Area (1 ha) 2.Minimum Access 6 m ROW Plot must be accessible Plot must be Road from 12 m RoW, of a accessible from continuous length minimum 30 m RoW, equivalent to at least 15% of a continuous of the perimeter of the plot length equivalent to at least 15% of the perimeter of the plot 3.Green Rating* Not required Entire scheme shall meet Entire scheme shall minimum Green meet minimum Green Ratings of GRIHA 3 or Ratings of GRIHA 3 or equivalent equivalent 4.Activities  Agriculture,  Farmhouses  Higher education Permitted Horticulture,  Open air markets/mandi campuses (including Floriculture, (e.g. farmers’ market, vocational training) Forestry handicraft or used goods  Non-polluting work  Smriti vans, Burial markets) centres like cyber Grounds,  Zoological parks and and knowledge Cemeteries and Aviaries industry, Research & Crematoriums  Sports facilities Development,  Composting  Primary and secondary  Agro processing facility education facilities and packaging,  Natural  Healthcare facilities cold storage wastewater (including  Green Houses treatment facility veterinary  Convention and  Solar fields and other renewable energy installations facilities) exhibition centres  Resorts, motels and  Concert Spaces, clubs stadiums**,  Storage facilities, cultural[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 606 showrooms and repair performance workshops/ service spaces, museums, centres to be permitted art galleries on 18 m RoW and  Amusement parks above. (except water parks  Green Houses that will not be  All Grade 1 uses permitted within permitted with FAR as GDA). prescribed under Grade 1  All Grade 1 & 2 uses  Animal Husbandry permitted with FAR  Socio-cultural facilities as prescribed under Grade 1 B. Development Control Norms 1.Permissible FAR FAR: 5 FAR: 20 FAR: 60 (with minimum 30 (with additional (with additional sq.m and maximum purchasable FAR of 10) purchasable FAR of 200 sq.m of built up 20) area on any size of land) 2.Maximum 5% 10% 20% Ground Coverage 3.Mandatory No requirement 15% of plot area 45% of plot area Wooded Area 4.Setbacks*** 3 m setback on all 10 m front setback and 5 m. 10 m setback on all sides setbacks on remaining sides. sides. This may be relaxed as per Clause18. 5.1(iv) 5.Basements Not permitted Permitted only under Permitted only built structures within under built permissible FAR structures within permissible FAR 6.Parking  5% of plot area to  10% of plot area to be  10% of plot area to be Provisions**** be earmarked for earmarked for surface earmarked for surface surface parking (to parking (to be kept parking (to be kept be kept unpaved) unpaved) unpaved) 7.Paved Surfaces  Paved surfaces shall not exceed 5% of the plot area after utilising the ground coverage.  Water absorbent paving material to be used in 50% paved area. * Grades 2 and 3 developments shall also adhere to any other greening norms prescribed by DDA. ** Stadiums shall be permitted a maximum FAR of 40. *** All structures falling along National Highways to adhere NHAI norms. **** Except in case of plots proposed for events/gatherings where minimum parking requirements shall be as per local body policy. 18.4.2 Compatible mix of activities are allowed provided permissible FAR and access conditions are met as per Clause 18.4.1.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 607 18.4.3 All developments shall adhere to prescribed green ratings and any violation of these norms shall be penalized. All GDA schemes must achieve a mandatory GBF of 0.4. Incentives may be provided for achieving higher than prescribed GBF. 18.4.4 Greenhouses, solar fields and other renewable energy installations fields shall be permitted under all grades, provided the total area under these installations is not more than 30% of the plot (after excluding the Mandatory Wooded Area as applicable). 18.4.5 Maximum 20% of the permissible FAR can be utilised for supporting facilities like small shops, restaurants or office. (ref: DCN) 18.4.6 All schemes shall be designed as ecologically self-sustaining units as follows: i) 100% decentralized treatment and maximum reuse of wastewater. ii) 100% on site processing of all green waste and animal waste. iii) 30% of the on-site energy requirements are met through renewable energy. iv) Optimum on-site trapping of storm water through mandatory rainwater harvesting, unlined storage ponds and reservoirs as part of landscaping and urban design. v) These facilities of composting and recycling can be developed as shared facilities. 18.4.7 The following shall be permitted/allowed: i) Levy any entry or access fees, rentals; ii) Option for rental/lease models for implementation and management; iii) Sub-divide their land and sell/lease plots as part of farmhouse or theme farming clusters, etc.; iv) Use the agricultural, forestry or other produce from the land commercially. 18.4.8 Change of grade of development is permitted, provided all conditions are met as per Clause 18.4.1. The Mandatory Wooded Area shall be increased as per the grade change. However, under no condition shall this area be reduced once approved under a certain grade. 18.4.9 DDA shall identify ecologically sensitive areas (e.g. low-lying areas, potential sites for ground water recharge, existing areas of high tree density, etc.), where only Grade 1 development shall be permitted. i) Owners of such lands shall be compensated in the form of TDR that can be utilised within identified receiving areas. ii) In case a portion of the plot falls under ecologically sensitive area, it can be utilised to meet the Mandatory Wooded Area requirements. The remaining plot may be used for any Grade of activity, as per Clause 18.4.1. In such cases, the compensatory TDR will only be awarded to the extent of land falling under ecologically sensitive area. iii) The norms for public gathering, events and functions shall be as per the policy of the concerned local body. 18.5 Special Conditions for Farmhouses 18.5.1 The following conditions shall be met for farmhouse developments: i) New farmhouses shall be permitted in the form of standalone plots or[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 608 farmhouse clusters. Standalone plots shall be permitted on minimum 12 m RoW. In farmhouse clusters, the internal roads shall be 9 m RoW, the cluster access should be from 12 m RoW. ii) Existing farmhouses constructed on private lands (till the date of notification of this Policy) with minimum access of 9 m, shall be regularised under Grade 2. iii) Where RoW is less than 9 m, all landowners along the street shall provide land to fulfil the access conditions, however the permissible FAR shall be applicable as per the original plot. In case this is not feasible, a minimum of 6 m RoW shall be provided with appropriate road geometrics as given in UBBL/IRC to ensure smooth movement of emergency vehicles. iv) Existing Farmhouses that do not meet the setback requirements for Grade 2 developments, shall provide setbacks on front and any one side of at least 5 m. 18.5.2 Other norms applicable for all farmhouse developments: i) Maximum built up area for a farmhouse plot (whether standalone or part of a cluster) shall not exceed 3000 sq.m irrespective of plot size. ii) Height of the built structures shall not exceed 12 m. iii) Basements in existing farmhouses that exceed the permissible FAR shall be regularised upon payment of requisite regularization charges up to the maximum extent of permissible ground coverage. iv) In addition to permissible FAR, 2 dwelling units of 30 sq.m each for community service personnel shall be permitted per 4000 sq.m of land area (up to a maximum of 5 such dwelling units per farmhouse plot). v) Watch & ward guard unit will be permitted adjacent to boundary or entrance gate up to a maximum of 20 sq.m as per UBBL free from FAR and setback norms. vi) Sub-division of plots shall be permitted not less than 4000 sq.m with an independent access from minimum 9 m RoW. 18.6 Provision of Infrastructure and Connectivity in the GDA 18.6.1 DDA shall prepare a GIS-based Integrated GDA Plan (IGP) in coordination with SPAs. The IGP will be a structure plan (with no pre-identified land uses) indicating the following: i) Excluded areas (as given in the Regulations to this Policy); ii) Eco sensitive areas; iii) Major access roads that will provide connectivity to the GDA. This will include all Master Plan, zonal plan roads and any local or revenue roads. 18.6.2 The alignment of Master Plan and Zonal plan roads passing through Green Development Area shall be adhered to. 18.6.3 Development of zonal roads shall be undertaken by concerned authorities to ensure connectivity to GDA. Land requirement for such roads shall be met through a pooling process as detailed in the GDA Regulations and suitable incentives such as TDR may be provided.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 609 18.6.4 Landowners shall provide land for social infrastructure and utilities such as police stations, fire stations, fuel stations, sub-stations, telecom towers, etc., as per local needs. The norms including road access conditions, setbacks etc. specific to the particular facility need to be adhered to. All such facilities can be developed on any land in the GDA as per permissibility in master plan and as per notified GDA Regulations. 18.6.5 Provision of trunk infrastructure for water, power and telecommunications shall be as per the Regulations to this Policy. --- x --- x ---- x --- x --- Chapter code 19.0 URBAN REGENERATION DEV3 19.1.1 A large number of areas in Delhi were developed between 1940-1970, resulting in an old built stock. Many of these areas are in a dilapidated state, in need of regeneration and can be utilised more optimally. These areas have different characteristics, needs, potentials and constraints, highlighting the requirement for a nuanced strategy for regeneration across the city. 19.1.2 The strategy is to use regeneration as a planning and design tool for renewing ageing and unsafe building stock and improving the quality of life of people living and working in these areas. It will also facilitate provision of physical and social infrastructure, revitalisation of historically and culturally significant areas, enhancement of the public realm, and strategic development in select areas by unlocking their latent potential. 19.2 Guiding principles 19.2.1 Nuanced framework to address different contexts ranging from planned residential neighbourhoods and economic centres, to dense unplanned areas. 19.2.2 Flexible framework with the option of using a mix of instruments for regeneration of an area, namely, retrofitting, reconstruction or full/partial redevelopment, provided that the requirements of structural safety, sustainable services and improved walkability are met. Reuse of existing good quality-built stock is a sustainable circular economy approach to construction. 19.2.3 Integrated framework for regeneration allowing amalgamation and reconstitution of plots to achieve integrated planning, creation of well-proportioned open spaces, improvement of road networks, walkability and sustainable site design. 19.2.4 Incentivised framework linked to public outcomes, providing incentives such as higher FAR or relaxed norms/charges on the condition that the project will fulfil public purpose for example, creation of new public spaces and parks, sustainable[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 610 development etc. 19.2.5 Strategic development framework to unlock the value of high potential areas in the city and achieve a better urban form over the long term (25-30 years), with higher FAR, densities and mix of uses concentrated closer to public transit nodes and networks and facilitate development of strategic hubs. 19.3 Applicability 19.3.1 This Policy shall apply to all existing developed areas, except the following: i) Areas under natural greens and water bodies, drains and buffers and any other areas identified for environmental protection ii) Zone ‘O’ iii) Green Development Area iv) Land Pooling Area v) TOD Nodes vi) Monument Prohibited Area and notified heritage sites/plots vii) Civil Lines Bungalow Area (as per layout plan of North Delhi Municipal Corporation & DDA) viii) Lutyen’s Bungalow Zone (as per layout plans of NDMC, L&DO) ix) Embassies/ Diplomatic Enclaves/ Foreign Missions 19.3.2 Regulations for Regeneration shall be prepared and notified within 6 months of notification of the Plan. 19.4 Reconstruction at Plot level 19.4.1 All buildings in Delhi, except heritage buildings and illegal structures, are permitted individual plot level reconstruction as per applicable development control norms. Regeneration FAR shall only be available for plots that fulfill the conditions of this Policy (including preparation of Regeneration Plan as per Clause 19.5). 19.4.2 The following typologies shall only be permitted reconstruction or addition/ alteration at plot level as per the following provisions: 19.4.2.1 Plotted residential development shall be permitted individual plot level reconstruction utilising the prevailing FAR for plotted housing as per MPD. i) Small sized plots may amalgamate only up to an area of 64 sq.m. 19.4.2.2 Mixed Use Streets/ Commercial streets: plot-level reconstructions as per norms for residential plotted development shall be permitted. i) Linear amalgamation of single line of plots along the street shall be permitted, provided that individual plots are 500 sq.m. Continuous active frontage shall be maintained along the street. Such schemes shall provide parking requirements within the plot. ii) Additional FAR of 10% of permitted FAR shall be provided for stack parking. 19.4.2.3 Non-Hierarchical Commercial Centres/ designated CCs/ designated LSCs/ designated CSCs/shop-cum-residence plots: shall be permitted to undertake plot-level reconstruction according to permissible plotted residential FAR.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 611 i) The permissible ground coverage shall be as per footprint of the existing structure, circulation space and open area shall be retained. ii) In shops with shared walls, property owners may come together and undertake reconstruction at block or street level. iii) Maximum two adjacent plots/ properties can be amalgamated. 19.4.2.4 Plots with non-heritage buildings in Shahjahanabad shall be permitted plot level reconstruction as per the following conditions: i) The grain of the fabric and street morphology shall be preserved. The existing circulation pattern may be improved without restructuring. ii) Plots shall be eligible for FAR as per norms for residential plotted housing. Maximum permissible height shall be 12m. Plots that are unable to utilise the permissible FAR shall be eligible for TDR. iii) Existing basements at plot level can be used for storage. No new basement shall be permitted in any building. iv) Permissible ground coverage shall be the same as existing. v) Built-to-edge frontage shall be maintained along access roads and no stilts shall be permitted in the Walled City Heritage Zone. vi) Mandatory ECS norms shall not be applicable in the Walled City Heritage Zone, and minimal parking shall be permitted for residents only. vii) Amalgamation shall be permitted only up to a maximum of 2 plots with non-heritage structures. viii) Local level commercial activities shall be permitted on ground floor. Entire building may be permitted to have retail, guest house, boarding and lodging, socio-cultural facilities, repair shops, restaurants, etc shall be permitted, if access from minimum 6m road is available. ix) Norms for social facilities shall be as per Clause 19.10.4.2 x) No projections/ chajjas/ balconies shall be permitted in structures facing streets less than 6m wide. 19.4.2.5 Integrated Regeneration Plans with specific building and urban design controls shall be developed on a case to case basis for special areas in Karol Bagh, area outside walled city and any other areas identified by the Authority from time to time. 19.4.2.6 JJ Resettlement Colonies: i) Plot level reconstruction shall be permitted with amalgamation of plots up to a maximum of 64 sq.m. ii) Regeneration Scheme shall be permitted for the entire area under a JJ Resettlement Colony as per the norms for Slum Rehabilitation. 19.5 Regeneration Plans 19.5.1 For comprehensive planning, Regeneration Plans (RPs) covering larger area shall be prepared. Thereafter separate Regeneration Schemes may be designed and implemented for single or multiple plots.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 612 19.5.2 RPs shall demarcate a public road grid/network of 18-24m roads @ approximately 500m c/c to provide access and circulation. Additional infrastructural requirements shall be provided in the RP. 19.5.3 RPs may be prepared by DDA or by any Developer Entity (DE) interested in undertaking Regeneration Scheme/s. RPs prepared by DEs shall be submitted to DDA or local body under whose jurisdiction the area falls for approval. DEs may also approach DDA to prepare RP for a particular area where more than one Regeneration Scheme is identified. 19.5.4 RPs shall be approved for an area of minimum 4 Ha or any area with well-defined boundary: 19.5.4.1 RP of an existing approved layout plan or a pocket/ block/ other sub- division having well defined boundaries shall be considered. Direct access from minimum 18m RoW along one longer edge is mandatory. For e.g. a pocket or sector in a group housing colony or a sub-division of an industrial layout. 19.5.4.2 RPs for LSC, CC, DC and integrated office complex shall be prepared for the entire approved layout. 19.5.5 On approval of the RP, smaller areas within the RP can submit for individual Regeneration Schemes after meeting the following requirements: 19.5.5.1 Minimum prescribed access conditions are met. 19.5.5.2 Regeneration Schemes shall not be permitted on vacant land. At least 50% of the cumulative FAR (permissible at the time of construction) on the Scheme area should be built up at the time of submission of the scheme for regeneration. This condition shall not apply to strategic areas i.e. TOD Schemes, Business Promotion Districts or any other strategic area notified by the Plan. 19.5.6 Roads and public facilities shall be provided in all Regeneration Schemes as per approved RP. 19.6 Norms for Regeneration Schemes in planned layouts 19.6.1 Regeneration Schemes shall have access from road of minimum 18m RoW. Amalgamation shall be permitted only for plots with the same gross land use. Reconstitution of plots may be done for the entire scheme area. 19.6.1.1 All schemes shall be permitted to use a mix of strategies to undertake regeneration as per clause 19.2.2. 19.6.1.2 Public areas such as roads, open spaces, drains, etc. may be included for integrated planning provided that public roads are less than 18m RoW and public drains with width of less than 5m, and public parks not bigger than ‘tot-lots’ not hampering the access to the adjoining plots. Such areas shall not consider for computation of permissible FAR and ground coverage. 19.6.1.3 Reconstitution of plots shall be permitted. Reconfiguration of existing roads and open spaces shall be permitted, provided that: i) the reconfigured layout provides equal or more area under roads and open spaces. In areas where a fine network of streets already exists, it shall be preserved as far as possible. ii) due approval has to be obtained from the concerned public[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 613 agencies for reconstitution of public parks and roads. Reconstituted public areas shall be handed over to the concerned public agency and remain open to public. there is zero or minimal damage to existing trees. 19.6.1.4 Regeneration schemes shall receive no additional water supply over and above the existing requirement except for Schemes with vacant land/s for which additional water supply may be provided on a case to case basis. The additional requirement shall be met by recycling of water and tapping of rain water. 19.6.2 Minimum area for a Regeneration Scheme shall be 3000sq.m. This shall be relaxed to 2000 sq.m. for Cooperative Group Housing Societies and 1000 sq.m. for Industrial plots. 19.6.3 The following segmented Regeneration FAR shall apply to Regeneration Schemes. No Factor for calculating incentive Scale of Scale of Scale of Regeneration FAR development development development (minimum 3000 (minimum 1 ha (4ha and sq.m.but lesser but lesser above) than 1ha)* than 4ha) 1 General Regeneration Factor 1.1X** 1.15X 1.2X (available to all Regeneration Schemes) 2 Sustainable Urban Services (SUS) Factor (additional FAR available for implementing requirements 2A and 2B given below) 2A Green Rating*** 0.15X (if platinum/5 Green Rating is achieved) 2B 20% public open green space Not applicable 0.05X 3 Age Factor 0.1X (additional FAR only available to schemes with 50% buildings older than 40 years) Maximum incentive Regeneration FAR 1.35X 1.45X 1.5X * for industrial and cooperative group housing plots, the minimum scheme area shall be as per Clause 19.6.2 **X stands for the current permissible FAR for each plot being included in the Regeneration Scheme ***Any green rating system as approved by Government from time to time. 19.6.4 The following shall apply to Regeneration Schemes: 19.6.4.1 Different premises within the Scheme shall be permitted additional uses as per the DCN. 19.6.4.2 Good quality EWS housing shall be provided within the Regeneration Scheme as per the norms of the Plan. The EWS FAR shall be over and above the residential FAR, calculated as 15% of the maximum permissible residential FAR in the scheme. The requirement for EWS housing shall be met as a separate well-designed area within the Scheme with low/mid- rise, high-density built form, with access to the public greens and social facilities. 19.6.4.3 For Schemes of less than 3000 sq.m. area, the option of collective[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 614 provision of prescribed EWS housing on an alternate site may also be explored. 19.6.4.4 10% of the area of the Scheme shall be mandatorily developed as a single consolidated Green Public Space for public use and handed over to the local body/DDA. In case Schemes of 1 ha and above, this requirement may be met by providing multiple parcels that are usable to the community as public space, with at least one parcel of 1,000 sq.m. 19.6.4.5 All Regeneration Schemes shall achieve a GBF factor of 0.2 (ref: DCN). 19.6.4.6 All schemes located along drains or water bodies shall maintain minimum mandatory buffers and building orientation as per ENV2. 19.6.4.7 All Schemes of plots more than 1ha shall provide public plazas as per HCP1. Corner plots on major roads shall mandatorily provide corner plazas. 19.6.4.8 Active frontage shall be maintained along all roads of 18m and above RoW. i) A setback of 3m shall be maintained with built-to-edge development for 70% of the building edge. At least 50% of such built-to-edge frontage shall be kept active on the ground/ podium floor by using arcades, colonnades, shop-fronts, pedestrian entries, plazas, etc. Residential schemes shall maintain at least 20% active frontage. ii) Buildings shall be recessed beyond a height of 10m or after two floors. 19.6.5 In case of residential schemes: 19.6.5.1 Plots earmarked for local level facilities (except senior secondary schools) can be included in the scheme with approval of concerned agencies. In such cases, equivalent facilities of the same type and area/pro rata basis as per norms shall be provided in the scheme. 19.6.5.2 At least 5% of the permissible FAR shall be utilised for provision of additional local facilities. Schemes of 4 ha or more shall be eligible to provide city level PSP facilities as per prevailing norms. 19.6.5.3 5% of the FAR may be utilised for commercial activities (as permitted in CSC and LSC). 19.6.5.4 Such PSP and commercial uses as given in Clauses 19.6.5.2 and 19.6.5.3 may be developed through vertical mixing. 19.6.5.5 Increase in the number of dwelling units shall be permitted in the scheme area (even in case of cooperative group housing societies for which relevant regulations/act may be amended by the Registrar of Societies). 19.6.6 In case of Regeneration Schemes within 500m radius of transit stations (except those declared as TOD Nodes), the following shall be permitted: 19.6.6.1 Ground coverage up to a maximum of 50% 19.6.6.2 Parking norms as applicable in TOD Schemes 19.6.6.3 Residential Schemes may utilise up to 10% of the permissible FAR for provision of PSP facilities 19.7 Strategic Regeneration 19.7.1 Business Promotion Districts (BPDs) shall be promoted as strategic economic and cultural hubs. RP shall be prepared for the entire area identified as BPD. 19.7.2 Schemes within BPDs shall be developed as per Clauses 19.6.1 and 19.6.4.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 615 higher Regeneration FAR shall be provided for such schemes as per the following table: No Factor for calculating Scale of Scale of Scale of incentive Regeneration FAR development development development (minimum 5000 (minimum 1 (4 ha and but lesser than ha but lesser above) 1 than 4 ha) ha) 1 Base Regeneration Factor 1.2X* 1.3X 1.4X (available to all Regeneration Schemes within BPDs) 2 Sustainable Urban Services (SUS) Factor (additional FAR available for implementing requirements 2A and 2B given below) 2A Green Rating 0.15X (if platinum/5 Green Rating is achieved) 2B 20% public open green space Not 0.05 applicable X 3 Use Promotion (USP) 0.2X 0.2X 0.2X Factor (additional FAR only available for implementing non- residential uses) Maximum incentive Regeneration 1.55X 1.7X 1.8X FAR *X stands for the ‘Base FAR’ i.e. the current permissible FAR for each plot being included in the Regeneration Scheme. 19.7.3 7.3 Schemes within BPDs shall be permitted maximum 275 FAR at Scheme level and additional 25 FAR in the form of TDR. 19.8 Integration of undeveloped private land parcels 19.8.1 There are some privately owned land pockets in Delhi that have remained outside the purview of planned development up till now due to reasons such as denotification from acquisition, exclusion from acquisition, legal encumbrances, etc. Planned development of such land pockets shall be as per “Regulations for Enabling the Planned Development of Privately Owned Lands". 19.9 Regeneration of Unplanned Areas 19.9.1 A number of Delhiites live and work in unplanned and/or unauthorized areas, characterized by poor condition of buildings, inadequate accessibility (particularly during emergencies) and inadequate physical and social infrastructure. However, these areas have also emerged as high density, mix-use hubs, providing affordable options for housing, micro, small and medium enterprises. Many heritage urban villages are also reinventing themselves as centres of high-end retail and cultural economies. There is a need to reinforce this potential, while incrementally improving safety standards, infrastructure and quality of life in these areas. 19.9.2 Four broad typologies of unplanned areas have been identified in the city. Provisions for regeneration have been provided for each type:[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 616 i) Unauthorized Colonies (UCs), including Regularized Unauthorized Colonies and those identified for regularization (19.10) ii) Urban Villages, including notified Lal Dora and Extended Lal Dora areas in the city (refer Clause 19.10.6) iii) Slums and JJ Clusters (refer Clause 19.11) iv) Non-conforming industrial areas (refer Clause 19.12) v) Non-Conforming Godown clusters (refer Clause 19.13) 19.10 Regeneration of UCs 19.10.1 UCs/part UCs shall be taken up for improvement in the following ways: i) Constituent land/property owners or RWAs can come forward with a UC Regeneration Scheme. Such schemes shall be considered as independent layouts for layout and building sanctions and may be proposed in any of the UCs, with or without regularized layouts. ii) UCs may alternatively apply for regularization of their existing layouts as per Regulations. Once the layout is approved, individual land/property owners may proceed for building plan sanction. 19.10.2 UC Regeneration Schemes: UCs/part UCs that wish to implement a UC Regeneration Scheme shall come forward as a Developer Entity (DE) and submit a scheme as per processes set out in the relevant Regulations. The following norms shall apply: 19.10.2.1 The scheme area shall have direct access from an existing road of 12m RoW (for atleast 15% of the perimeter of the scheme). This condition may be met by providing area for road widening, provided that the scheme includes an entire road stretch that connects with a road of minimum 12m ROW on at least one side. 19.10.2.2 Four types of schemes can be proposed: i) Level 1: 2,000 – 3,000 sq.m. consolidated land area ii) Level 2: 3,000 – 5,000 sq.m. consolidated land area iii) Level 3: 5,000 – 10,000 sq.m. consolidated land area iv) Level 4: More than 10,000 sq.m. consolidated land area 19.10.2.3 A large proportion of the prescribed setbacks shall be utilised for development or widening of roads. This shall not only improve accessibility within the UC but also provide opportunities to adjoining unplanned areas to come up with UC Regeneration Schemes by fulfilling the minimum access condition. As such all land for public roads shall be handed over to the concerned local body whenever required. 19.10.2.4 DEs shall ensure that the scheme has a regular shape and boundary. Linear amalgamations of single line of plots along a road shall not be permitted, unless the individual plots are 750 sq.m. or more in area. 19.10.2.5 Two or more adjoining UCs/ part UCs may be brought under a single UC Regeneration Scheme. A scheme may also include additional area outside the boundary of the UC if the land/property owners on both sides agree to plan in an integrated manner. This additional area shall not be more than 25% of the scheme area and MPD norms as per land use shall apply on this area for calculation of FAR. 19.10.2.6 Public areas such as roads, open spaces, drains, etc. may be included in Level 3-4 schemes for purposes of integrated planning. However, the area under such public facilities shall not be considered for[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 617 meeting minimum area requirements or computation of FAR and ground coverage. Such areas may be reconfigured as part of the final layout provided all general conditions mentioned in Clause 19.4.5 are followed. 19.10.3 FAR for Regeneration Schemes in UCs: 19.10.3.1 FAR for a UC Regeneration Scheme shall be calculated as follows: Area of plot (sq.m.) Permissible FAR* Up to 175 350 175 up to 250 300 250 up to 750 250 750 up to 1500 225 1500 and above 200 *In case the computed built area for a plot is less than that permitted in a lower category plot, the maximum built area of the lower category shall be permitted 19.10.3.2 In order to improve the availability of facilities in UCs, a special Amenities FAR will be available as an incentive regeneration FAR: Level of UC Amenities Regulating conditions Regeneration FAR Scheme Level 1 20 Secondary schools and city-level Level 2 30 facilities shall not be permitted Level 3 40 All PSP uses permitted, provided that Level 4 50 open space requirements are met. Separate entry/exit and service cores shall be provided for city-level facilities. 19.10.3.3 Permissible scheme FAR shall be the sum of FARs of all constituent land parcels with additional incentive FAR in the form of Amenities FAR. 19.10.3.4 The base land use for all schemes shall be Residential. i) While standard MPD FAR of 200 shall be considered Base FAR and be free of any regularization charges, all additional Scheme level FAR will have to be purchased by the DE at rates prescribed by DDA. Such charges shall be waived for every affordable rental housing unit of 60 sq.m. created by the DE and maintained at regulated rents for a period of 15 years. Such properties shall be part of a public rental housing inventory and all rental transactions for such properties shall be executed through a portal created by DDA for the purpose. ii) 5% of the final scheme FAR shall be mandatorily utilised to provide local level commercial and PSP facilities. The DE shall have the option of utilizing up to 15% of the FAR for such facilities. 19.10.4 Other development norms for Regeneration Schemes in UCs: 19.10.4.1 The following other development norms shall apply:[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 618 Parameter Level 1 Level 2 Level 3 Level 4 Ground Up to 50% Up to 50% Up to 40% Up to 40% coverage Minimum - 2m on 12m and above ROW Setback as - 4.5 m on sides with access from less than 12m ROW per edge - 6m on all sides adjoining existing built-up condition* Public 10% as a 10% as a 10% as plot 10% as plot for space** single plot single plot for public public purpose purpose including at including at least one plot least one plot of 1,000 sq.m. of 500 sq.m. Parking 1.0 ECS/100 sq. m. Land for - 5% to 15% based on the existing infrastructure social already available within a radius of 1 to 3 km infrastructure *** *setbacks shall be kept hindrance free at all times and be made available for road widening/construction as and when required **shall have access from minimum 9m RoW and shall be transferred to the local body. Local body may utilize such public space for provision of parks, plazas or installation of utilities as per requirement. ***shall be provided as one consolidated land parcel with access from minimum 9m RoW and shall be transferred to the local body. Local body may utilize the land for provision of schools or multi-facility centres (including healthcare facilities, community halls, basti vikas kendras, police posts, child-care centres, early learning centres, small-scale non-polluting economic activities, community green- waste recycling, dhalaos or material recovery centres, informal markets, etc.) 19.10.4.2 The following norms shall apply for provision of social infrastructure as part of UC Regeneration Schemes: Facility* Facilities built on separate plot Facilities provided through vertical mixing Minimum FAR Ground Minimum Additional Plot Area Coverag built up conditions (sq. m.) e (%) area (sq. m.) Primary 800 120 30 960 Open space School requirements to be met Senior 2000 150 35 3000 Open space secondary requirements to school be met Any other 500 – 120 30 600s Health facilities local 1000 in with a maximum of facility the form 50 bedded facility of Multi (@60 sq. m./bed) Facility can be created Centre s 19.10.4.3 Once a UC Regeneration scheme is approved, implementation may be permitted for smaller blocks of minimum 3,000 sq.m in case of level 4[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 619 schemes. 19.10.5 Layout Plan approval of existing UCs shall be as per the Regulations. 19.10.5.1 Once the layout plan has been approved, applications for individual plot- level building plan sanctions can be submitted to the concerned local body. 19.10.5.2 The land use of all approved plots shall be ’Residential’. However, to ensure provision of local level facilities within such UCs, the following shall be permitted i) Plots measuring 100 sq.m. or more and falling on 9m RoW shall be permitted to utilize up to 100% of the residential FAR for providing local level facilities (except secondary schools) as per the norms for vertical mixing given in Clause 19.2.12 above. ii) Up to 5% of commercial shall be permitted on all plots with access from minimum 6m RoW. iii) Such uses shall be permitted as part of ‘as is’ approvals as well as plot level reconstructions 19.10.6 Affluent UCs: Affluent UCs as identified by the Central Government shall be eligible for layout plan approval and development of Regeneration Schemes as per prescribed norms 19.11 In Situ Slum Rehabilitation Schemes 19.11.1 The following norms shall apply for in-situ slum rehabilitation schemes. 19.11.1.1 Group housing norms with a minimum plot-size of 2000 sqm (on a min. RoW of 9m) shall be permitted. Maximum density of 900 DUs/ha permitted on residential component of the land. 19.11.1.2 Minimum 60% of the site shall be utilised to provide housing for the identified beneficiaries (@25-40 sq.m. per DU) and maximum 40% shall be remunerative component. 19.11.1.3 The scheme should be designed in a composite manner with an overall maximum FAR of 400 on the residential component of the land. FAR of 300 shall be applicable on the remunerative component of the land with mix of uses. 19.11.1.4 Local facilities shall be provided as part of residential FAR as per the population accommodated under the project/scheme. To support the livelihood of the occupants and create new job opportunities, mandatory 10% of permissible FAR of residential component shall be utilised for creation of commercial and industrial activities. Such facilities may be accommodated as part of vertical mixing. Service floors shall also be permitted for use as community work centres, provided no permanent structures/fixtures are created. 19.11.1.5 Commercial activities permitted in Community Centres (in projects with ROW of minimum 18m) and District Centres (in projects with ROW of 30m or more). 19.11.1.6 Common parking is to be provided for residential component at 0.5 ECS per 100 sqm of floor area which can be relaxed wherever required. Parking for remunerative purposes shall be as applicable for the relevant land use. 19.11.1.7 Innovative financing mechanisms such as TDR and/or Viability Gap Funding may be utilised to ensure that the social development[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 620 objectives of such schemes are prioritised while ensuring adequate remuneration to private partners. Possibility of clubbing of multiple schemes may also be examined for this purpose. 19.11.1.8 Specific situations may require clubbing of scattered squatters with JJ sites in the neighbourhood to work out an overall comprehensive scheme. 19.12 Regeneration of unplanned industrial areas 19.12.1 Besides the planned Industrial Areas, GNCTD has notified clusters of Industrial concentration in non-conforming areas for redevelopment (Annexure 9). More than 70% plots in such clusters have industrial activities. 19.12.2 The redevelopment process involves preparation of redevelopment plans for widening of roads, laying of services, development of open space and parking etc. 19.12.3 In practical terms, these areas are deficient in terms of services and endanger the environment. The redevelopment of such areas needs to be based on clearly defined parameters in terms of the types of industries which may be permitted, spatial planning norms and environment related conditionalities regarding the provision of essential infrastructure with the participation of the owners/entrepreneurs in a systematic manner. 19.12.4 Keeping in view the existing realities, as well as the imperatives of planned development, the following norms shall apply for redevelopment of clusters of Industrial Concentration in Non-Conforming Areas: i) Non-conforming clusters of industrial concentration of minimum 4ha contiguous area, having more than 70% plots within the cluster under industrial activity/use may be considered for redevelopment on the basis of actual surveys. After notification of such clusters by GNCTD, the redevelopment scheme shall be prepared by the concerned local body / land owning agency. ii) The cluster should have direct approach from a road of at least 18 m RoW. iii) Formation of Society and any other such entity shall be mandatory to facilitate preparation of redevelopment plan, pollution control and environmental management, development of services, parking and maintenance. iv) Only permissible industries having clearance from DPCC shall be permitted. v) Amalgamation and reconstitution of plots shall be permissible for redevelopment. vi) All the units shall have to obtain the statutory clearances. The industrial units shall have separate electric connections. vii) Other stipulations include: a. About 10% area is to be reserved for circulation / roads / service lanes. b. About 10% of semi-permeable surface for parking and loading / unloading areas. c. About 8% of the cluster area shall be reserved for parks / greens. d. About 10% of total area to be reserved for infrastructure requirements like CETP, Sub-Stations. Pump House, Fire Station, Police post, etc. as per the norms. e. About 3% area shall be permitted under commercial use.] f. Preparation of plans for water supply by DJB / Central Ground Water Authority (wherever required) along with requirement for pumping[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 621 stations, storage tanks, ground water recharging / rainwater harvesting; and drainage plan g. Plots measuring more than 100 sq.m to have access from minimum 9.0 m. RoW; and plots measuring less than 100 sq.m to have access from minimum 7.5 m. RoW. h. Common parking to be provided for plots below 60 sq.m, and designated in the layout plan whereas for plots above 60 sqm front setback of minimum 3m shall be provided without boundary wall for parking and loading and unloading. i. Alternatively, the Society may adopt the option of preparation of layout plan/Redevelopment scheme based on the land distribution. as stipulated in the DCN viii) Other provisions/development control norms shall be applicable as prescribed. Depending upon ground conditions, the Technical Committee of DDA may relax in the norms up to 10%. Note: These facilities mentioned at 12.4.7 (a, b, c, d) shall be provided subject to availability of land within Industrial cluster or in the surrounding area. 19.12.5 The regeneration work may be undertaken by the societies voluntarily or by the concerned local body/agencies. In case the agencies take up the redevelopment work, they shall collect the charges from the individual industries directly. Requisite charges for change in land use, enhanced FAR and land (wherever applicable) would be required to be paid to the concerned agency. 19.12.6 The regeneration scheme shall be prepared within a period of 2 years of notification of the plan. Scheme shall be completed with the time period of 3 years after approval of scheme. Clusters, which fail to complete the redevelopment proposals within the specified period specified, shall have to shift to other conforming industrial areas and the units functioning in non-conforming clusters shall have to close down. In such cases, the licensing authority will not renew/ issue the licenses to industrial units without obtaining land use clearance from the competent authority. No new licenses will be issued in non-conforming areas, without obtaining land use clearance. 19.12.7 The following areas shall not be eligible for industrial clusters redevelopment scheme: Bungalow Zones (New Delhi & Civil Lines), the Ridge, River Bed (Zone- O), areas along water bodies, canals, sensitive areas from security point of view, conservation & heritage areas, reserved / protected forests, DDA flats, Cooperative Group Housing Societies, Government flats / bungalows / employer housing etc. and their immediate proximity. 19.13 Norms for Redevelopment of godown clusters in non- conforming areas 19.13.1 The National Capital Territory of Delhi Laws (Special Provisions) Seconds Act- 2011 provides for formulation of “policy or plan for orderly arrangement regarding schools, dispensaries, religious institutions, cultural institutions, storages, warehouses and godowns used for agricultural inputs or produce (including[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 622 dairy and poultry) in rural areas built on agricultural land and guidelines for redevelopment for existing Godown clusters (including those for a storages of non- agricultural goods) required to cater to the needs of the peoples of the National Capital Territory of Delhi” 19.13.2 There are large number of godowns, food grain, marbles and other good have come into existence in the rural area of Delhi last time in earlier MPD, village Lal Dora, extended Lal Dora etc., The NCT of Delhi (Special Provisions) Act 2007 Further extended upto 2023 provide formulation of policy. The following norms shall be applicable to stand along and godowns cluster. i) Stand along godwons:- Stand along godown plots which do not form part of big cluster shall be governed with the following conditions. ii) Stand-alone godowns (storage of non-polluting / non-hazardous materials) shall be allowed on minimum 30 m RoW. iii) In village abadi (lal dora area) and extended lal dora areas, storage godowns of non-polluting / non-hazardous materials shall be allowed on: a) 9 m. RoW with plot size up to 300 sq.m (7.5 m in case the road is defined / approved by the Revenue Department.) b) 12 m. RoW for plot size above 300 sq.m. iv) These godowns shall be allowed subject to fulfilment of parking requirements within the plot and NOC from Delhi Traffic Police and Delhi Fire Services of GNCTD. v) Facility for loading / unloading from the vehicles shall be provided within the plot. vi) Owners of standalone godowns shall get the plans approved a definite time period. The owners of plots falling in nonconforming areas and existing godowns located on less than 30 m RoW will have to shift to the other conforming areas / godown clusters by 31.12.2023. Such godowns functioning in non-conforming areas shall have to close down within the above said time period. 19.13.3 Non-conforming godown cluster: Non-conforming cluster of godown / warehousing activities of minimum 2 ha contiguous area and having concentration of more than 55 percent of the plots within the clusters may be considered for regeneration of area identified on the basis of actual surveys. 19.13.4 After notification of such clusters by the local bodies / GNCTD, the regeneration scheme will have to be prepared by the society (to be formed by the land owners) based on following norms/ conditions and thereafter approval by concerned local body. i) The cluster should have direct access from a road of minimum 30m RoW. ii) Formation of group or society shall be mandatory to facilitate preparation of regeneration scheme / plan, development of services, parking and maintenance, pollution control and environment management. iii) Amalgamation and reconstitution of plots shall be permissible for regeneration within the scheme area. iv) Owners of the godowns shall have to obtain the requisite statutory clearances from the concerned agencies, wherever necessary. After approval of the Layout Plan for regeneration by the society, the identified clusters will be processed for change of land use on receiving the proposal from local body.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 623 v) Other stipulations shall include: a. About 10% area is to be reserved for circulation / roads / service lanes. b. About 10% area of semi permeable surface for common parking, idle parking and loading / uploading areas. c. About 10% of the area to be reserved for associated infrastructure requirement such as Electric Sub-stations, Fire Station, Police Post, servicing, lodging and Boarding and informal market areas etc. as per the norms. d. Preparation of Plan for water supply from DJB / Central Ground Water Authority (wherever required) along with requirement for pumping stations, storage tanks, ground water recharging / rainwater harvesting and Drainage plan as per norms. e. About 8% of the area shall be reserved for parks / green buffer. f. Utilities such as ESS, underground water storage tank, rain water harvesting system, solar heating / lighting systems etc. will be provided within the plot. g. All plots within the scheme should have direct access from minimum12 m RoW. h. Other provisions / development control norms shall be applicable as prescribed. Note: Subject to availability of land for these facilities mentioned at v) (a, b, c, e) within godown cluster or in the surrounding area be considered. vi) Requisite conversion charges and any other levies as decided by the Government from time to time (wherever applicable) would be required to be paid to the concerned authority. vii) Regeneration plans of individual clusters will have to be prepared by the society and thereafter approved by the concerned local authority / MCD. The redevelopment shall be completed within three years from the date of approval of the plans. viii) Clusters, which fail to complete the regeneration proposals within the period specified as above, shall have to shift to other conforming areas and these godowns functioning in non-conforming clusters shall have to close down. In such cases, the licensing authority will not renew the licenses to such godowns without obtaining land use clearance from the competent authority. Further, no new licenses will be issued in non-conforming areas, without obtaining land use clearance. 19.13.5 Other conditions 19.13.5.1 Development control norms for the godown plot incorporating the risk- based classification as per Table 3.2 of UBBL 2016, shall be as follows: Plot Size Max. Gr. Max. FAR Max. Height Parking (in sq. m.) Coverage (%) Up to 500 70 140 Below 15 m Common parking to Above 500 - 60 120 Below 15 m be provided in case of 2000 plots upto 300 sq.m. Above 2000 - 50 100 Below 15 m 3 ECS / 100 sq.m. of upto 10,000 floor area for plots[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 624 Above 10,000 40 80 Below 15 m above 300 sq.m. Notes: 1. Wherever the building regulations are given for different categories of plots, the covered area and the floor area shall in no case be less than the permissible covered area and floor area respectively for the largest size of plot in the lower category. 2. Conformity to fire safety norms based on Risk based classification as per UBBL 2016; Delhi Fire Services Act. 3. Common parking shall be provided for plots up to 300sqmt. size and front setback shall be provided without boundary wall for use of parking and loading / unloading purposes. 4. For plots above 300 sq.m, provision for parking and loading / unloading shall be made by the owners within their plots. 5. Provision / use of basement shall be as per the stipulations of MPD-2021. 6. Workroom / Office (not exceeding 25% of the permissible FAR) related to godown activity within godown premises shall be allowed in a covered permanent structure with proper arrangements of dust and pollution control subject to clearance from statutory bodies. 19.13.5.2 The remaining plot owners shall be allowed to continue with existing use or conversion to godowns or any permissible use as per provisions stipulated in the MPD / UBBL / policy guidelines and after obtaining clearances / permissions from all statutory bodies. 19.13.5.3 All the Regeneration Scheme sunder these guidelines shall conform to all the statutory provisions and Master Plan stipulations / UBBL, 2016. 19.13.5.4 The concerned local body and the stakeholders will work out the mechanism for the recovery of stipulated levies / charges. 19.13.5.5 In case of surrender of land for road widening, the FAR of the original plot will be permissible. 19.13.5.6 The implementation of these regulations be brought out by the Local Body as part of user-friendly Guide covering the Frequently Asked Questions (FAQs) for such projects. 19.13.5.7 The following areas shall not be eligible for godown clusters regeneration schemes: Bungalow Zones (New Delhi & Civil Lines), the Ridge, River Bed (Zone-O), areas along water bodies, canals, sensitive areas from security point of view, conservation & heritage areas, reserved/protected forests, DDA flats, Cooperative Group Housing Societies, Government flats/bungalows/employer housing etc. and their immediate proximity. --- x --- x ---- x --- x --- 20.0 TRANSIT ORIENTED DEVELOPMENT Chapter code DEV4 20.1.1 Transit-Oriented Development (TOD) is an innovative urban paradigm that involves leveraging existing and upcoming public transit infrastructure and associated large number of users, to ensure sustainable mobility and optimize utilisation of land through compact mixed-use development. 20.1.2 A TOD approach in Delhi will help in bringing people and jobs closer to mass transit and lead to much needed integration of land use and transport in the city. It will result in compact, walkable, mixed-use developments within influence zones of transit stations. This is a critical paradigm shift that can potentially improve public transit ridership, reduce vehicular congestion, and reduce greenhouse emissions and pollution in the long term.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 625 20.1.3 TOD is also an important strategy for unlocking the latent economic potential and land values in the city. It will facilitate the development/regeneration of select nodes/areas in the city through planned intensification of uses and activities, infusion of new infrastructure and improvements in the public realm. This will also allow the city to capitalise on the large-scale investments being made into public transit infrastructure - Metro Rail, Regional Rapid Transit System (RRTS), etc., by facilitating the improvement of old housing stock in addition to creation of new housing stock and economic centres around strategically located transit nodes and opening up opportunities for value capture. 20.1.4 The following key outcomes shall be targeted through the TOD Policy for Delhi. 20.1.4.1 Optimised density and diversification of uses and activities: This will be facilitated through higher FAR norms and compact mixed-use development, with augmentation of infrastructure by respective service providing agencies, and application of norms for green buildings and environment conservation. Such an approach will result in achieving an optimum mix of activities and higher job densities close to public transit systems, unlock the development potential of these areas and facilitate value capture. 20.1.4.2 Enhanced mobility: i) Pedestrian and NMT friendly environment - providing highest priority to pedestrians and NMT, through various strategies such as traffic management plans, street improvements, creation of a fine network of pedestrian and NMT routes and restricted and high- priced public parking. ii) Modal shift in favour of public transport through multi-modal integration, enhanced walkability and last mile connectivity. 20.1.4.3 Improved public realm: Generation of a vibrant and safe public realm for all age groups, with barrier-free universal access, achieved through place- making strategies for creation of public plazas and open/green spaces, multi-utility zones, spaces for public art, etc. 20.1.4.4 Multi-modal integration: Integration of rail and road-based systems which may include metro, rail/ rapid rail, bus/ BRTS and intermediate public transport (IPT) including feeder services, taxis, auto-rickshaws & private modes including non-motorized transport (NMT) such as cycle- rickshaws, bicycle, pedestrian, etc. 20.2 Applicability of the Policy 20.2.1 DDA will identify TOD Nodes and release maps showing the delineated TOD Planning Area for each TOD Node. The TOD Policy will only be applicable in the influence zones of such TOD Nodes. The Policy will not be applicable in the following areas or as notified by DDA from time to time: i) Land under drains, natural water bodies, notified forest, any other environmentally protected areas ii) Zone ‘O’ and buffers iii) Green Development Areas[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 626 iv) Villages notified under the Land Pooling Policy v) Monument Prohibited Area vi) Civil Lines Bungalow Area (as per layout plan of North Delhi Municipal Corporation & DDA) vii) Lutyen’s Bungalow Zone, Chanakyapuri (as per sub-zone D-13 of Zone-D) viii) Walled City ix) Land under Embassies/Diplomatic Enclaves/Foreign Missions x) Unauthorised colonies 20.3 Guiding Principles 20.3.1 This framework will provide higher norms for FAR and mix of uses. In order to manage the impacts of such developments and maximise the opportunities, the Policy will be implemented strategically in select TOD Nodes with high development potential. This will enable the creation of well-planned growth centres, developed as per sustainability principles, capable of developing into future economic drivers and cultural hubs for the city. 20.3.2 DDA will undertake a rapid assessment of the development potential of the various transit nodes in the city and identify a limited number of TOD Nodes on the basis of their strategic importance and ease of implementation. 20.3.2.1 Such transit nodes shall be along Metro Rail, Railway, RRTS or any public transit system having the capacity to carry 5,000 or more peak hour per direction traffic (PHPDT) with a dedicated carriageway. 20.3.2.2 Strategic nodes will be identified on the basis of the following broad considerations: i) The nodes shall have sites that can be readily taken up as TOD Schemes (adding up to a minimum of 8 ha), such as vacant or underutilised government lands, government housing, commercial centres, industrial estates, etc. Availability of such sites will ensure that trigger projects can be taken up on priority to provide the necessary impetus for other projects to come up in the node; ii) They shall have a good mix of green field and/or low-density brown field sites; iii) Their location shall be strategic – either as economic/cultural hubs for the city or as potential triggers for development/regeneration of under-developed areas in the city. iv) They shall be amenable to augmentation of infrastructure such as water supply, sewerage, etc. 20.3.3 Additionally, further TOD nodes may be considered only if adequate interest has been expressed by constituent land/ property owners i.e., at least 8 ha of land is proposed to be developed in the form of a single or multiple TOD Schemes. A joint application shall be made to DDA comprising of the following: i) Map showing the sites proposed to be developed as TOD Scheme/s, ii) List of landowners with details of location and area of land proposed under the TOD Schemes, iii) Letters of consent from all the land and property owners involved. DDA shall examine such proposals and may consider such nodes for inclusion[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 627 under the Policy. 20.3.4 DDA/DE will prepare an IZP for the delineated TOD Planning Area of concerned TOD Nodes. IZPs prepared by DEs shall be submitted to DDA for approval. DDA may appoint expert consulting firms/institutions to expedite the process of IZP preparation. 20.3.4.1 In case two or more TOD Nodes are in close proximity with overlapping TOD Planning Areas, such areas shall be planned as an integrated IZP. 20.3.4.2 The IZP shall integrate any other plans or schemes proposed for the area such as plans for enhancing walkability, street improvement, Parking Management Area Plans, etc. Any Multi-Modal Integration (MMI), station area development projects proposed around the transit stations by concerned transit agencies shall also be considered while preparing the IZP. 20.3.4.3 The IZPs may be updated/revised over time (as required) to reflect the changes due to development activity, to meet the needs of the area. 20.3.5 All lands and properties within the respective Influence Zones will be eligible to undertake development as per the norms of this Policy, provided they fulfil the requirements for undertaking TOD Schemes as per applicability. Interested land owners may apply as a DE by preparing a TOD Scheme as per procedures set out in the Regulations. 20.3.6 While participation under the TOD Policy is voluntary, the Development Control Norms of this Policy can only be availed by participating through approved TOD Schemes. Constituent Land/property owners within the TOD Nodes who do not participate in the TOD Policy shall only be permitted to undertake reconstruction/additions/ alterations to their existing buildings as per the permissible FAR without taking into account TOD benefits. They shall also not be eligible to avail the norms of any other policies of DDA, unless specifically stated otherwise. 20.4 TOD Schemes 20.4.1 TOD Schemes must fulfil the following criteria in order to be eligible: 20.4.1.1 A TOD Scheme must cover a minimum area of 1 ha. TOD Schemes may fully or partly fall within the Intense Development Area of a TOD Node. In any case: i) At least 25% of the scheme area shall fall in the Intense Development Area ii) The entire scheme area shall fall within the TOD Planning Area. 20.4.1.2 A TOD Scheme must be accessible from an existing road having a minimum ROW of 18m, of a continuous length equivalent to at least 15% of the perimeter of the scheme. 20.4.2 Plots earmarked for Housing area and Neighbourhood level PSPs (except senior secondary schools and parks) can be included within TOD Schemes, provided that the underlying land belongs to the DE/constituent landowners of the DE. In such cases, equivalent facilities of the same type and of the same area shall be provided in the scheme. These facilities shall be over and above the mandatory[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 628 PSP requirements prescribed under this Policy. 20.4.3 Public areas such as roads, open spaces, drains, etc. may be included in the TOD Scheme for purposes of integrated planning provided the following conditions are met: 20.4.3.1 Public roads (less than 18m. RoW) 20.4.3.2 Public drains (not more than 5m. width) 20.4.3.3 Public parks (not exceeding the open space hierarchy of ‘tot lots’ as per the Plan.) However, the area under such public facilities shall not be considered for meeting the minimum scheme area requirement for computation of permissible FAR/ ground coverage. 20.4.4 Amalgamation and reconstitution of plots (including Housing Area and Neighbourhood PSPs) will be permitted for all TOD Schemes. Reconfiguration of existing roads and open spaces within a TOD Scheme area shall be permitted, provided that: 20.4.4.1 The reconfigured layout provides equal or more area under roads and open spaces. In areas where a fine network of streets for pedestrian movement already exists, it shall be preserved as far as possible. 20.4.4.2 Due approval has been obtained from the concerned public agencies in case of public parks and roads. Such public areas shall be handed over to the concerned public agency and remain open to public at all times. 20.4.4.3 There is minimal damage to existing trees. 20.4.4.4 The areas under existing public parks as per Clause 20.4.3.3 (if any) shall be preserved and shall not be counted towards the minimum Green Public Space requirement of the Scheme. 20.4.5 In case of brown field sites, increase in the number of dwelling units shall be permitted under this Policy (even in case of cooperative group housing societies for which relevant regulation/act may be amended the Registrar of Societies). However, reducing the existing number of dwelling units shall not be permitted in a TOD Scheme. 20.4.6 Development under TOD Schemes can be a mix of new development, partial/full reconstruction and partial/full retrofitting of existing structures. 20.4.7 TOD Schemes may comprise of plots under different land uses/ use premises. The permissible mix of uses for each plot in a TOD Scheme depending upon the assigned land use/use premise shall be as per the Table below: Table 20.1: Mix of Uses / Distribution of FAR in TOD Land use/ use Permissible Mix of Uses (distribution of FAR in TOD Scheme) premise of plot as Minimum % of Minimum % of Minimum % of Other uses per ZDP/ Layout FAR for FAR for FAR for PSP Plan Residential Commercial and/or utilities uses uses[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 629 Residential 50% 10% 20% Other uses* are permitted up to 20%. Commercial 30% 50% 10% Other uses* are permitted up to 10%. Industrial 30% 10% 10% Remaining 50% of FAR to be for Industrial use. Government 30% 10% 10% Remaining 50% of FAR may be for any Government use. Transportation 30% 10% 10% Remaining 50% of FAR may be for any use* after meeting all operational requirements for transportation facilities. PSP (only housing The FAR for such plots shall be entirely utilised for PSPs and/or utilities in the and neighbourhood TOD Scheme. level PSP plots allowed as per Clause 20.4.2) * This remaining FAR can be utilised as a mix of residential, commercial and PSP in any proportion as per project requirement. 20.4.8 Any plot falling under notified mixed use/ commercial streets that are part of TOD Scheme shall be developed as per norms specified for ‘Residential’ in Table 20.1. 20.4.9 FAR and mix of uses will be separately calculated for each constituent plot in a TOD Scheme. The overall mix of uses for a TOD Scheme shall be a sum total of the mix computed for each constituent plot. The DE shall have the flexibility to utilise such overall mix on the entire reconstituted scheme area as per design considerations. The prescribed mix can also be achieved through vertical mixing of uses within buildings, provided that: 20.4.9.1 Only non-manufacturing industries (service industry like IT/ITES, BPO/KPO, etc.) and non-polluting MSME units are combined with other uses like residential, commercial and institutional, 20.4.9.2 Educational institutions, anganwadis, creches, old age homes, etc., are not combined with hospitals, penal institutions such as correction facilities, jails, etc. or manufacturing and/or warehousing facilities, 20.4.9.3 Facilities as mentioned above shall mandatorily be developed on the lower floors, preferably with access to open spaces of the TOD Scheme, 20.4.9.4 Separate entry/exits and service cores will have to be provided as required in buildings with vertical mix of uses, complying with statutory requirements of prevalent UBBL. 20.4.10 For plots falling under transportation land use as a part of TOD Scheme, following areas shall be included for calculation of FAR, ground coverage, minimum scheme area and mix of uses:[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 630 20.4.10.1 Area of the platforms of transit stations including land under tracks only for the length of the platform. 20.4.10.2 In case of depots, operational areas including land under tracks within such plots. Over station and over tracks development shall be permitted in these areas. Over station development shall be limited to the length of the platform. 20.4.11 Commercial FAR can be utilised to provide -activities permitted in Community Centres (in TOD Schemes with ROW of 18 to 30m.) and District Centres (in TOD Schemes with ROW of 30m. or more). 20.4.12 The DE shall provide the following mandatory public areas as part of TOD Scheme layouts: 20.4.12.1 Green Public Space: i) 20% of the area of the amalgamated plot shall be developed as Green Public Space for public use. The DE shall design and develop this in the form of parcels that are usable to the community as public space, with at least one parcel of 2000 sq.m. Such greens shall be kept un-gated, have direct access from a major ROW (18m. or above) on at least one side and shall be handed over to the concerned local body for maintenance. No parking or basements shall be permitted under such greens. ii) Additional 10% green/recreational area shall be developed by the DE for exclusive use of the occupants. This may include plazas, tot-lots, green spaces, gardens, common areas, etc., that can also be provided on top of basements, podiums, terraces, etc. The extent of podium area used for this purpose shall not be included for computation of ground coverage. iii) In case of transportation land use, where it is not feasible to create Green Public Space at ground level in TOD Schemes that have large area under tracks, this requirement may be met through podium level public greens. Such greens shall be maintained by the concerned transport agency. 20.4.12.2 Public road network: DE shall provide additional roads/streets for public use within the TOD Scheme as per the following norms. i) Road networks to be planned with a vehicular route network of approximately 250m. c/c and pedestrian network of approximately 100m. c/c. ii) Based on ground conditions, this may be relaxed up to a maximum of 10%. 20.4.13 City-level PSP plots (community or zonal PSPs and secondary schools) cannot be part of any TOD Scheme. However, in order to meet the additional requirement for health, education and other PSP facilities to cater to the enhanced densities in TOD Nodes, any such PSP plots (greater than or equal to 1 Ha) falling entirely within the TOD Planning Area shall be permitted to apply as stand-alone TOD Schemes. Such schemes can avail an additional FAR of 1.5 times the existing permissible FAR up to a maximum of 500. The following additional conditions shall apply: 20.4.13.1 Mix use norms shall not be applicable to such sites, and the existing use premise shall be retained.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 631 20.4.13.2 In case of school plots, the existing area under playgrounds shall be retained or increased within the same plot. 20.4.13.3 ROW of the adjoining road shall not be less than 30m. 20.4.14 TOD Schemes falling in two TOD Nodes (where the influence zones of such TOD Nodes are adjacent and contiguous) can be considered for approval, provided they meet all other conditions under this Policy. 20.4.15 Joint ventures for station area development or development of multi-modal transit hubs may be considered between multiple transport agencies. Such projects shall be designed to ensure integration between various transport services and may be designed as part of the same building/ complex for seamless commuter movement. Wherever feasible, concourse level integration between TOD Scheme developments and mass transit stations shall be ensured, and the cost for the same shall be borne by the DE. 20.4.16 DE shall execute the development in accordance with the provisions detailed in the TOD Regulations. 20.5 Development Control Norms for TOD schemes 20.5.1 The Development Control Norms of this Policy shall be applicable to all TOD Schemes and prevail in case of conflict with any other policy/provisions within the Plan. Development under TOD Schemes can be a mix of new development, partial/full reconstruction and partial/full retrofitting of existing structures. The strategy to be adopted shall be detailed by the DE as part of the TOD Scheme submission and approved as per the process laid out in the Regulations. 20.5.2 FAR 20.5.2.1 The FAR for a TOD scheme shall be calculated as the sum of FAR calculations for all constituent plots. FAR entitlement for each constituent plot shall be calculated as follows: i) The FAR shall be 1.5 times the existing permissible FAR on the plot or 300, whichever is more. ii) The maximum FAR limit for any plot included in TOD Schemes shall be 500. iii) Larger TOD Schemes with an area of 4 ha and above, having direct access from roads of 30m. RoW, will be eligible for FAR of 500 on all constituent plots, if feasible. 20.5.2.2 While consumption of the entire entitled FAR is not mandatory, the following shall be ensured by all TOD Schemes: i) Minimum FAR utilisation shall be equivalent to the existing permissible FAR for each of the plots. ii) Overall proportion of mix of uses shall always be maintained. 20.5.2.3 In case of TOD Schemes that include existing service lanes/ public roads/ public drains/ public parks, etc., land under such areas shall not be considered for computation of FAR. 20.5.2.4 Any public amenities provided as part of the development such as public toilets, bridges, etc. shall be free of FAR, subject to the condition that they are maintained regularly by the DE and remain open and accessible to public at all times of the day, failing which, the concerned local body shall take over the same. 20.5.2.5 TOD Schemes that are not able to utilise the permissible FAR due to[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 632 height restrictions, may be allowed relaxations in ground coverage and setbacks without compromising the area to be maintained under Green Public Spaces and subject to fire safety requirement. 20.5.2.6 Larger TOD Schemes (4 ha and above) with direct access from 30m. or above RoW shall be considered TDR receiving areas and utilise TDR as per DCN. 20.5.3 Size of dwelling units 20.5.3.1 There is no restriction on the size of residential units for accommodating existing dwelling units within the TOD Scheme. 20.5.3.2 In order to encourage affordable and non-ownership housing (rental housing, student housing and hostels) within TOD Schemes, the following norms shall apply: i) The residential FAR remaining after accommodating existing number of dwelling units, shall be used for providing dwelling units of size up to 60 sq.m. ii) In case a TOD Scheme comprises of plots with no existing residential development, at least 50% of the residential FAR shall be used for developing dwelling units of size up to 80 sq.m. iii) In case of TOD Schemes comprising of a mix of existing built-up and vacant plots, the final mix of dwelling units in the TOD Scheme will be derived on a pro-rata basis as per above provisions. 20.5.4 Ground Coverage and setbacks: Norms for setbacks and ground coverage shall apply to the entire TOD Scheme boundary, as part of the reconstituted plan for the scheme area. 20.5.4.1 Maximum ground coverage of 40% shall be permitted. 20.5.4.2 The following setbacks shall be maintained: Table20.2: Setbacks in TOD Schemes Type of plot edge Setback Public road of 18m. and  No setback above RoW  At least 90% of the building line shall be built-to-edge Roads of ROW < 18m. or  6m. setback site edge facing parks,  The setback to be kept unblocked natural at all times for public movement. drains, forest, etc.  Trees/plantation for noise reduction Shared edge with and utilities like fire hydrants shall adjoining plot be permitted 20.5.4.3 Active frontage includes arcades, colonnades, shopfronts, pedestrian entries/ exits, plazas, access points, transparent windows etc. i) At least 50% of frontage along 18m. ROW streets, and at least 10% frontage along all other streets (including public streets) shall be maintained as active frontage. ii) No projections (balconies, awnings, etc.) shall be allowed beyond the built-to line. iii) All vehicular entries shall be from side streets. In case of sites where no side streets are available, at least 1 road with ROW of 12m.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 633 or more will have to be provided as part of the TOD Scheme. iv) Commercial frontages shall have minimum 50% transparent facade (un-tinted) at ground floor level. Residential frontages shall have balconies/verandas and active spaces facing public ROWs. v) The ground floor of all parking structures / podiums or stilts must be lined with active frontage facing the main streets. vi) All buildings shall be recessed by 10m. beyond the height of 10m or after two floors. Any further recess required for providing adequate light and ventilation shall be maintained. 20.5.5 EWS Housing: DE shall provide good quality EWS housing within the TOD Scheme as per the norms of the Plan. The EWS FAR shall be over and above the residential FAR, calculated as 15% of the maximum permissible residential FAR in the scheme. The requirement for EWS housing shall be met as a separate well-designed area within the Scheme with low/mid-rise, high-density built form, with access to the public greens and social facilities. 20.5.6 Parking: 20.5.6.1 TOD Schemes shall provide 1 Equivalent Car Space (ECS) per 100 sq.m. of covered area, with mandatory 5% of the parking area earmarked for bicycles and wheelchairs. 20.5.6.2 DE shall provide at least 50% of all parking facilities within TOD schemes as ‘public parking’ facility. 20.5.6.3 At least 10% of the parking area shall be equipped with charging points for electric vehicles as per prescribed policy/ UBBL. 20.5.7 Other controls 20.5.7.1 Other building controls: i) Building design shall ensure that all dwelling units have natural ventilation and receive direct sunlight in at least one habitable room. ii) Adequate noise reduction measures shall be incorporated where buildings are adjacent to mass transit stations. 20.5.7.2 Location of various use premises: i) PSP and commercial uses shall be located on lower floors with adequate public frontage. ii) Facilities such as creches, day care centres for children and elderly shall be provided as part of the TOD Scheme. Such facilities shall be located on a public road created within the scheme with access to public greens planned within the scheme. 20.5.7.3 Norms for Public Roads within TOD Scheme: i) All new roads (including facilities like street furniture, lighting and illumination and public conveniences) shall be as per Street Design Regulations (Annexure 7) and integrate fully with any proposals for MMI, walking and cycling as per the IZP for the TOD Node. ii) Separate child care rooms, changing spaces for cyclists and drinking water fountains shall be included within the design of public conveniences. iii) Cycle parking facilities shall be provided at every 100m. interval along the network. These can be calculated as part of the mandatory ECS requirement. iv) The public road network within TOD Schemes can be partially[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 634 covered through walkways, bridges or building blocks, provided that: o The covered length does not exceed 1/3rd of the total length of the network o Such walkways, bridges or building blocks provide a clear height of 8m from the highest point of the road section. v) TOD Schemes that include metro stations within the scheme area, shall create pedestrian plazas for congregation/ spill over on ground or at the concourse level as feasible. Such schemes must also include multi- modal integration facilities for IPT, buses, drop-off for private vehicles, etc. as part of the design. vi) The road network shall be kept active at all times through appropriate public activity programming along the edges such as vending zones, plazas, shops, restaurants, open spaces, etc. 20.5.7.4 Sustainability Features: i) TOD Schemes shall meet all greening norms notified by DDA at the time of approval of the Scheme. Greens and public spaces within a Scheme shall be interconnected to form green-blue and public space networks as far as possible. ii) Each TOD Scheme shall ensure the following: o 100% treatment and maximum reuse of wastewater; o Segregation and reuse of 100% green waste; o At least 10% of the energy demand should be met through renewable sources like solar o Optimum retention of storm water for direct reuse and recharge of groundwater as per applicable norms. o Only permeable materials are used for surface parking and open plazas. Multiple schemes/DEs may come together to meet these sustainability requirements. 20.5.7.5 Universal Barrier - Free Access - All public spaces, roads, Green Public Spaces, parking areas, buildings, etc. within TOD Schemes and all area improvement works taken up as per the approved IZPs shall be designed for barrier free universal access as per Harmonised Guidelines and Space Standards for Barrier Free Built Environment for Persons with Disability and Elderly Persons, 2016 of the Ministry of Housing and Urban Affairs, Government of India. --- x --- x ---- x --- x --- SECTION 8 PLAN MONITORING AND EVALUATION 21.0 MONITORING FRAMEWORK Chapter code PME 21.1.1 The master plan is a long-term perspective framework for guiding city[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 635 development. It is critical for the strategies in the Plan to adapt and align with the changing needs and ensure that the provisions remain relevant and effective for achieving the vision and goals identified for the development of the city. This will require a robust monitoring framework to periodically take stock of the key performance indicators, timelines, and action points. 21.1.2 The on-ground progress of implementation of various policies of the master plan shall be monitored continuously, thereby reducing time lags in data procurement and analysis. A detailed review shall be conducted every five years and the master plan shall be modified if required. 21.1.3 Such a dynamic framework will be supported through the following multi- pronged approach: i) KPI-based Evaluation: An evaluation framework comprising of various key performance indicators (KPIs) is proposed to measure the effectiveness of the plan. The KPIs are focused on measuring larger outcomes for the city and will help in undertaking course correction for achieving the goals and objectives. ii) Multi-agency Coordination: This will comprise of various coordination committees, with members from multiple concerned agencies. These committees will take stock of the progress, facilitate inter-agency coordination, and address hurdles (if any) for implementation. iii) Data Sharing and Management: A data protocol shall be defined to decide the process, particulars and periodicity of sharing of data by concerned agencies, to ensure collation required data for supporting plan monitoring. iv) Dedicated Monitoring Unit: An interdisciplinary team will be set up at DDA for monitoring the progress of the Plan. v) Implementation support: In order to facilitate proper implementation, the business processes associated with implementation of various spatial policies (ref: Section 7) shall be streamlined through single window systems, robust grievance management frameworks and real- time tracking. Technical support shall also be provided to stakeholders for implementation of various projects/schemes. 21.2 Evaluation framework 21.2.1 Delhi’s progress towards achieving the vision and goals envisioned for the Plan period shall be measured through the following Key Performance Indicators (KPIs): i) Reduction in Indigenous Air Pollution ii) Water Pollution Control iii) Green Cover Enhancement iv) Rejuvenation of Water Bodies v) Flood Risk Reduction vi) Wastewater Reuse vii) Groundwater Augmentation viii) Reducing Landfill Stress ix) Converting Waste to Wealth x) Share of Renewable Energy in Total Usage xi) Seismic Compliance[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 636 xii) Safety Against Fire Outbreaks xiii) Share of Small Format Housing in New Housing Stock xiv) Slum Rehabilitation xv) Shift towards Public Transport xvi) Adoption of Electric Vehicle xvii) Human Development Index xviii) Heritage Conservations xix) Vibrancy of Public Streets xx) Female Participation in Workforce 21.2.2 Details of these indicators are provided in Annexure 11. 21.2.3 These indicators will contribute to three key indices linked to the goals of the master plan: 21.2.3.1 Environmental Sustainability Index: that corresponds to Goal 1 (G1) of the Plan 21.2.3.2 Built Environment Index: that corresponds to Goal 2 (G2) of the Plan 21.2.3.3 City Vitality Index: that corresponds to Goal 3 (G3) of the Plan 21.2.4 The KPIs will contribute to computation of these indices as follows: 21.2.4.1 Ten core KPIs contribute to the Environmental Sustainability Index. These are Reduction in Indigenous Air Pollution; Water Pollution Control; Green Cover Enhancement; Rejuvenation of Water Bodies; Flood Risk Reduction; Wastewater Reuse; Groundwater Augmentation; Reducing Landfill Stress; Converting Waste to Wealth; and Share of Renewable Energy in Total Usage. Additionally, two cross-cutting KPIs, namely, Shift towards Public Transport, and Adoption of Electric Vehicles, also contribute to this Index. 21.2.4.2 Six core KPIs contribute to the Built Environment Index. These are Seismic Compliance; Safety against Fire Outbreaks; Share of Small Format Housing in New Housing Stock; Slum Rehabilitation; Shift towards Public Transport; and Adoption of Electric Vehicles. Additionally, a cross-cutting variable in the form of Flood Risk Reduction also contributes to this Index. 21.2.4.3 Four core KPIs contribute to the City Vitality Index. These are Human Development Index, Heritage Conservation, Vibrancy of Public Streets, and Female Participation in Workforce. 21.2.4.4 An overarching Delhi Liveability Index shall also be developed for assessing the overall progress of the city in implementing the Plan. This will be computed by using the progress against all 20 indicators. 21.2.4.5 All KPIs are quantitative, and shall be measured against desired targets for each 5-year period between 2021-41. The three coordination committees indicated in Clause 21.3 shall be responsible for setting these desired targets within the first year of plan implementation. The targets shall be set in consultation with the various concerned departments/agencies. 21.3 Multi-agency coordination framework[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 637 21.3.1 Three monitoring committees, namely, Environmental Sustainability Committee (ES-COM), Built Environment Committee (BE-COM) and City Vitality Committee (CV-COM) shall be set up to monitor the progress achieved against the three goals of the Plan. The committees shall have representatives from concerned departments/agencies and shall be chaired by a senior officer from DDA. 21.3.1.1 The ES-COM shall lead the monitoring of the progress made against actionable items in chapters ENV1, ENV2, INF1, INF2, INF3, INF4, and take stock of the KPIs related to the Environmental Sustainability Index. 21.3.1.2 The BE-COM shall lead the monitoring of the progress made against actionable items in chapters SS1, SS2, MOB1, MOB2, MOB3, MOB4, and take stock of the KPIs related to the Built Environment Index. 21.3.1.3 The CV-COM shall lead the monitoring of the progress made against actionable items in chapters ECO, HCP1, HCP2, and take stock of the KPIs related to the City Vitality Index. 21.3.2 Sub-committees may be formed under the ES-COM, BE-COM and CV-COM to facilitate the working of the committees. The committees may also direct concerned agencies to prepare detailed Action Plans and Special Projects for achieving the targets. 21.3.3 An annual progress report shall be developed by each monitoring committee, highlighting the status-quo with respect to the on-ground implementation of the Plan and suggesting measures for course correction as required. 21.3.4 The three monitoring committees shall report on an annual basis to a high- powered Apex Review Committee, chaired by the Lieutenant Governor of Delhi. The Apex Committee shall review the annual progress reports, provide coordination support and suggest amendments to the Plan as required. 21.3.5 An annual multi-agency workshop may be organized by DDA to discuss any implementation issues being faced by different agencies, review road maps and take stock of overall progress and future plans and projects. 21.4 Data sharing and management 21.4.1 The Apex Review Committee shall finalize a list of key data points that need to be monitored and shared by each agency periodically for estimating the KPIs. A formal data sharing protocol shall be set up for all concerned agencies indicating the data points, metrics and standardized units, sources and methods for data capture, periodicity of reporting, etc. This shall be mandatorily followed by concerned agencies. 21.4.2 A dedicated web portal shall be set up by DDA for the concerned agencies to upload the data pertaining to each KPI, which will be made accessible to the committees monitoring the respective KPIs. 21.5 Plan Monitoring and Review Unit at DDA 21.5.1 A dedicated Plan Monitoring and Review Unit (PMRU) shall be set up at[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 638 DDA comprising an interdisciplinary team of professionals to carry out the various supportive tasks required for plan implementation. 21.5.2 The PMRU shall perform the following indicative tasks: i) Develop a data bank based on information received from different agencies. ii) Prepare annual review reports based on the data received/compiled. iii) Manage the GIS database of the master plan (Delhi Spatial Information System) including updating the database with real time inputs from different agencies, on ground surveys, CLUs, etc. iv) Manage the online citizen portal developed by DDA as per Clause 21.6.2. v) Conduct or commission studies to evaluate key trends, issues and challenges on a wide range of topics. vi) Act as a technical support unit to the Apex Review Committee. 21.6 Implementation Support 21.6.1 DDA shall set up online single window mechanisms to support smooth implementation of the various spatial development policies (ref: Section 7) of the Plan. The portal shall act as a one-point facility for making applications, participating in schemes, tracking the status of approvals, etc. 21.6.2 DDA shall also develop and maintain an online citizen portal for providing information on a regular basis, as well as for responding to queries made by the citizens. An online dashboard with real time analysis of data and reporting on various milestones/ achievements may be included within the portal. 21.6.3 DDA and other government agencies may provide technical assistance and handholding support to stakeholder groups such as RWAs, market traders associations or civil society organizations for conceptualizing, designing and executing various area improvement projects both within planned and unplanned areas of the city. 21.6.4 DDA and other government agencies shall ensure continuous engagement with different citizen groups such as women, youth etc., and stakeholders to understand and assess impacts of plan implementation on ground; obtain feedback and solicit views; suggestions on various projects and initiatives planned for the city and to provide opportunities and avenues for citizen-driven innovation. 21.6.5 DDA shall also develop simple to understand FAQs and IEC material, guidelines for topics such as improving public spaces through community action, greening of built environments, etc. and make such material available to public through its online portal. --- x --- x ---- x --- x --- x ---[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 639 SECTION 9 DEVELOPMENT CODE & DEVELOPMENT CONTROL NORMS Chapter code DCN 22.0 DEVELOPMENT CONTROL NORMS Development Control Norms are special provisions that regulate development within the framework of the land use plan and policies contained in the Plan. These apply to all plots/integrated schemes/areas and is envisaged to improve the quality of built and natural environment by promoting appropriate development on all sites. Any development, extension, change of use, new or existing, use conversion, site alteration, relocation, reconstruction and any building or other structure shall be governed by these norms 22.1 Land Use Plan for Delhi 2041 22.1.1 Land Use Plan for Master Plan for Delhi - 2041 (MPD – 2041) has been prepared on GIS (Geographic Information System) platform considering the existing ground/ site conditions. Delhi has been divided into 18 Planning Zones. In the base map various issues such as change of Land Uses notified by Central Government till date, overlapping issues of Zonal boundaries, continuity of existing/ proposed roads, rectification of actual size and shapes of Land Uses/ Use Zones as per actual site condition, refinement of Zonal Plan Boundaries have been resolved and incorporated in the Master Plan. 22.1.2 Mapping of the NCT of Delhi will also be updated from time to time to have valuable data with respect to ground situation, to detect and prevent unauthorised development including encroachment on public land and facilitate the protection of greens.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 640 22.1.3 In order to control the development, the areas have been identified into 27 Use Zones in the Development Code. These Use Zones have been classified broadly in nine categories of Land Uses namely Residential, Commercial, Industrial, Recreational, Transportation, Utility, Government, Public & Semi - Public Facilities and Green Belt & Water Body. The development in these Use Zones would be carried out in accordance with the regulations as laid down in the Development Code and respective chapters. 22.2 Zonal Development Plans 22.2.1 The NCTD has been divided in 18 Planning Zones (Divisions) designated 'A' to 'P' (except Zone 'I') in the Master Plan 2041. 22.2.2 The Zonal plans shall act as link between the Layout Plan and Master Plan. The development schemes and layout plans indicating various use premises shall conform to the Master Plan / Zonal Plans. 22.2.3 In absence of Zonal Plan of any area, the development shall be in accordance with the provisions of the Master Plan. No urban activity shall be permitted without change of land use / modification to the Master Plan as per the Delhi Development Act, 1957. The Zone wise approximate area is as given below: Table 22. 1: Zone Wise Area S. No. Zone Name of Zone Area (Ha.) 1 A Walled City + Other than Walled City 540.65+628.42=1169.07 (OWC) 2 B City Extn. (Karol Bagh) 2317.05 3 C Civil Line 3991.73 4 D New Delhi 6657.30 5 E Trans Yamuna 8567.96 6 F South Delhi-I 11088.82 7 G West Delhi-I 12311.22 8 H North West Delhi-I 5452.84 9 J South Delhi-II 15519.67 10 K-I West Delhi-II 6461.91 11 K-II Dwarka 5708.44 12 L West Delhi-III 22108.97 13 M North West Delhi-II 5594.68 14 N North West Delhi-III 14015 15 O-I* River Zone (Active floodplain) 6295.00 16 O-II* Riverfront (Regulated) 3638.36 17 P-I Narela 9623.26 18 P-II North Delhi 8128.92 Note: *The above areas are approximate and as per GIS. The re-delineation & rezoning of the zones can be done with the approval of the Authority.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 641 22.3 Land Use and Use Zones 22.3.1 The National Capital Territory of Delhi is divided into nine (9) Land Use categories as mentioned in the Table 22.2. Each Land Use category is assigned number of Use Zones, which shall be further subdivided into required number of Use Premises. Any one of the Use Zones may be located at one or more than one places as shown in the Land Use Plan. The boundaries of various pockets of use zones are defined in Land Use Plan. Table 22. 2 : Land Use and Use Zones S. No. Land Use Use Zones 1 Residential RD* Residential Area RF Foreign Mission S. No. Land Use Use Zones 2 Commercial C1 Retail Shopping, General Business and Commerce, District Centre, Community Centre, Non-Hierarchical Commercial Centre C2 Wholesale & Warehousing, Cold Storage and Oil Depot C3 Hotels 3 Industrial M1 Manufacturing, Service Industry and Repair Industry 4 Recreational P1 Regional Park P2 City Park, District Park, Community Park, Multi- purpose grounds P3 Historical Monuments / Archaeological parks P4 Green Buffers P5 Sports Facilities/Complex 5 Transportation T1 Airport T2 Terminal/Depot - Rail/MRTS/Bus/Truck, Yards T3 Circulation – Rail/MRTS/Road/RRTS/High Speed Rail 6 Utility U1 Water (Treatment Plant etc.) U2 Sewerage (Treatment Plant etc.), U3 Electricity (Power House, Sub-Station etc.) U4 Solid Waste (Treatment, etc.) U5 Drain U6 Other Utilities[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 642 7 Government G1 President Estate and Parliament House G2 Government Office Complex / Courts/ PSUs G3 Government Land (Use undetermined) 8 Public and Semi- PS1 Health, Education and Research University / University centre, College, Social - S. No. Land Use Use Zones Public Cultural, Socio Cultural Complex/ Centre, Police / Police Headquarter / Police Lines, Fire stations / Disaster Management Centres, Religious, Burial Ground /Cemetery/ Cremation PS2 Transmission Site/Centre A1 9 Green Belt Green Belt and Water Body A2 River Zone (Active floodplain), water bodies and natural drains Note: 1. *Land use of Village Abadi (Lal Dora / firni) and Extended Lal Dora, as notified by Revenue Deptt., GNCTD, located in any use zone is residential. 2. Mixed Use Zone in the Land Use Plan may consist of more than one Use Zone. 22.4 Spatial Development 22.4.1 Spatial development shall be governed through specific spatial development policies (DEV 1,2,3,4) for greenfield and brownfield areas. 22.4.2 The Plan identifies Overlay Zones, such as Business Promotion Districts (BPD), Transit oriented Development (TOD), Land Pooling Area, Green Development Area. These zones will enable specific type of development as per applicable norms set out in the spatial development policies. 22.5 Sanction of Plans 22.5.1 Layout Plans / Site Plans and Building plans shall be approved by the Local Bodies and Authority in their areas of jurisdiction. 22.5.2 Authority / Local Body(s) shall be empowered after levying penalty to compound deviations from limits of coverage/ FAR to the extent of 5% of the permissible coverage and FAR, subject to maximum of 13.5 sqm. in building(s) / premises at the time of considering the completion / occupancy certificate. In Group Housing schemes and Public & semi-public facilities, 5% FAR beyond permissible FAR can be compounded by the authority / Local Body at the time of considering the completion/occupancy certificate. 22.5.3 Wherever required, the Technical Committee of the DDA shall formulate policy guidelines for the sanctioning of layout plans, comprehensive/ integrated schemes and re-generation schemes as identified. The Technical Committee[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 643 shall be empowered to call for the plans from the development organisations / Local Bodies and would give directions / recommendations wherever necessary. Old redevelopment schemes shall be termed as regeneration schemes. 22.5.4 Any change in the location, boundaries and predominant use of use premises shall be duly approved and incorporated in Layout Plan. 22.5.5 Layout Plans already approved by the Authority or any other local authority concerned in accordance with law shall be deemed to have been approved. An area in respect of which there is no approved Layout Plan shall be governed by the provisions of the Master Plan / Zonal Development Plan. 22.5.6 The service plans corresponding to all layout plans/ integrated schemes, for provision of physical infrastructure like water supply, sewerage, drainage, etc., shall conform to municipal byelaws/ service providing agency. 22.5.7 Conversion charges / other levies as prescribed by the Government from time to time shall be payable wherever land use conversion is enabled at premise level by the Master Plan / Zonal Plan or any other Regulations. 22.5.8 In case of spatial development, the minimum area prescribed for planning and approval shall be as per applicable policy. 22.5.9 Requisite Plans as prescribed under various policies shall be a mandatory requirement for layout and building plan approvals. 22.5.10 The provision of requisite social infrastructure within residential use zone, shall be governed by the norms for local level of 10,000 population, as per Table 22.2a 22.6 Hierarchy of facilities For the purpose of devising an equitable and planned development the essential as well as support facilities need to be provided at different level of development hierarchies ranging from local level to city level. The planning standards for all required facilities are as below Table 22.2 a Hierarchy of facilities TO BE PER UNIT LEVEL FACILITIES NO. OF PLOTS PROVIDED AREA LOP ZDP Non-bedded Health 1 @ 10,000 Min. 800 Sqm √ Facility Learning Centre/ Creche 1 @ 10,000 Min. 500 Sqm √ Range- 2000- School (Type-I) 1 @ 10,000 √ 4000 Sqm Local Level Min. 4000-8000 Pop: Upto School (Type-II) 1 @ 10,000 √ Sqm 10000 Socio-Cultural facility Range 800 – 1 @ 10,000 √[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 644 (Type-I) 2000 Sqm Other Community 2 @ 10,000 Min. 400 Sqm √ Facility (Type-I) Local Level Play Area 1 @ 10,000 Min. 5000 Sqm √ Traffic and Police As per Max. 25 Sqm control room requirement As per Police Post Max. 150 Sqm √ requirement Local Level Pop: P&T facility (Type-I) As per requirement √ Upto 10000 Milk Booth/ Milk, Fruit & As per standard Vegetable Booth/Delhi Milk design of the 1 @ 5,000 √ Supply concerned Booth/ Fair Price Shop department Tot lot 40 @ 10,000 Min. 125 Sqm √ Local level parks 1 @ 10,000 Minimum 1 ha √ Three wheeler & Taxi 1 @ 10,000 Min. 400 Sqm √ Stand Bus Terminal 1 @ 10,000 Min. 1000 Sqm √ Convenience Shopping 1 @ 5,000 Min. 1000 Sqm √ Centre Local Shopping Centre 1 @ 10,000 Min. 3000 Sqm √ Service Market 1 @ 10,000 Min. 2000 Sqm √ √ Informal Sector Market 1 @ 10,000 Min. 1000 Sqm √ Non-bedded Health 1 @ 1 Lakh Min. 300 Sqm √ Facility (Veterinary) Health Facility (Small) 6 @ 1 Lakh Min. 1000 Sqm √ Range-0.2 to 1.5 Hospital 3 @ 1 Lakh √ √ ha Socio-Cultural facility 2 @ 1 Lakh Min. 1000 Sqm √ (Type-II) Police Post 1 @ 1 Lakh Max. 2500 Sqm √ Fire Post 1 @ 1 Lakh Max. 2500 Sqm √ Night Shelter 1 @ 1 Lakh Min. 100 Sqm √ Community Sports Range- 1.0 to 3.0 1 @ 1 Lakh √ Centre ha Community Community Park 1 @ 1 Lakh Min. 3.5 ha √ Level Pop: Community Upto 1 Lakh 1 @ 1 Lakh Min. 2.0 ha √ √ Multipurpose Ground Min. 600 Sqm (As per provisions of the applicable LPG godown including As per standards of √ booking office requirements PESO) Bus Terminal 1 @ 1 Lakh Min. 1000 Sqm √ Parking space for parking of buses, LMVs, IPTs, etc. 2 @ 1 Lakh Min. 3000 Sqm √ Community Centre 1 @ 1 Lakh Min. 2.0 ha √ √ Hospital 3 2 @ 5 Lakh Min. 1.5 ha √ √ Sub- City De-addiction/ Level Pop: 1 @ 5 Lakh Min. 2000 Sqm √ Rehabilitation Centres Upto 5 Lakh Veterinary hospitals 1 @ 5 Lakh Min. 2000 Sqm √[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 645 TO BE PER UNIT LEVEL FACILITIES NO. OF PLOTS PROVIDED AREA LOP ZDP Special Schools 4 @ 5 Lakh Min. 2000 Sqm √ Research & 1 @ 5 Lakh Min. 4000 Sqm √ √ Development Centres Institute 1 @ 5 Lakh Min. 4000 Sqm √ √ As per UGC/ College 2 @ 5 Lakh √ AICTE Norms Socio-Cultural facility 1 @ 5 Lakh Min. 5000 Sqm √ (Type-III) Other Community 5 @ 5 Lakh Min. 1000 Sqm √ Facility (Type-II) Range- 3.0 to District Sports centre 1 @ 5 Lakh √ 10.0 ha Police Station 2 @ 5 Lakh Max. 1.0 ha √ √ Fire Station 2 @ 5 Lakh Max. 1.0 ha √ √ Disaster Management Range- 0.5 to 1.0 1 @ 5 Lakh √ Unit ha Cremation Ground 1 @ 5 Lakh Min. 5000 sqm √ Electric Crematorium 1 @ 5 Lakh Min. 5000 sqm √ District Park 1 @ 5 Lakh Min. 25 ha √ District Multipurpose 1 @ 5 Lakh Min. 4.0 ha √ Ground Bus Terminal 1 2 @ 5 Lakh Min. 2000 Sqm √ √ Bus Depot 1@ 5 Lakh Min. 4000 Sqm √ √ As per Fuel Station As per DCNs √ requirement District Centre 1@ 5lakh Min. 10 ha √ √ As per Medical Council of India As per Medical College and Veterinary √ requirement Council of India Norms Veterinary As per Council of India Veterinary Institute √ requirement / Ministry norms University Campus City Level As per As per UGC/ including International √ requirement AICTE Norms Education Centre (IEC) / Socio-Cultural facility As per requirement √ (Type-IV)* City Level Sports: 1 @ 10 Lakh Divisional Sports Min. 10 ha √ and above Centre* Other Community As per Min. 2000 Sqm √ √ Facility (Type-III) requirement Other Community As per requirement √[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 646 TO BE PER UNIT LEVEL FACILITIES NO. OF PLOTS PROVIDED AREA LOP ZDP Facility (Type-IV) District Jail 1 @ 50 Lakh Min. 2 ha √ As per Police Lines Max. 1 ha √ requirement District Police Office and As per Max. 1 ha √ Battalion requirement Police Training As per Max. 5 ha √ Institute/ College requirement Police As per Max. 5 ha √ Firing Range requirement As per Police camp Max. 5 ha √ requirement As per Max. 5 ha Fire Training Institute √ requirement Disaster Management As per Max. 5 ha √ Centre requirement P&T facility (Type-II) 2 @ 20 Lakh Min. 2500 Sqm P&T facility (Type-III) As per requirement √ Burial Ground 1 @ 10 Lakh Min. 1 ha √ Cemetery 1 @ 10 Lakh Min. 1 ha √ Burial Ground for 1@ 10 Lakh Min. 2000 Sqm √ Animals City Park 2@10 Lakh Min. 40 ha √ City Multipurpose 1@10 Lakh Min. 8.0 ha √ Ground Bus Depot As per Requirement √ Fuel Stations As per requirement √ As per ISBT Min. 10 ha √ Requirement Wholesale 1@ 10 lakh Min. 8.0 ha √ * Upto 200 ha to be reserved in Land pooling areas wherever possible UTILITIES Water Supply and Sanitation PER UNIT LEVEL FACILITIES NO OF PLOTS LOP ZDP AREA Sewage Treatment Plant (STP) STP (with SPS & EPS ) - As per upto 5 MGD (22.7 MLD) 650 Sqm /MLD Requirement capacity STP (with SPS & EPS ) - As per 1,100 Sqm NA capacity above 5 MGD √ √ Requirement /MLD (22.7 MLD) Sewage Pumping Station As per 50 Sqm (SPS) Requirement Effluent Pumping As per 50 Sqm Station (EPS) Requirement[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 647 TO BE PER UNIT LEVEL FACILITIES NO. OF PLOTS PROVIDED AREA LOP ZDP Water Treatment Plant (WTP) WTP - 80 MGD (363 As per 300 Sqm /MLD √ √ MLD) Requirement WTP - 40 MGD (182 As per 400 Sqm /MLD √ √ MLD) Requirement Underground Reservoir with Booster Pumping Stations As per 5 ML Capacity 700 Sqm /ML √ Requirement As per 50 ML Capacity 600 Sqm /ML √ Requirement Solid Waste Management Area for segregation of waste and parking of Local Level 1 @ 10,000 200 Sqm √ utility vehicles (previously: Dhalao) Material recovery 6,000 - 8,000 Sub-City Level facility (semi- 1 @ 5 Lakh √ Sqm automatic): 200 TPD Material recovery facility 10,000 - 20,000 City Level (automated) : > 1@ > 20 Lakh √ √ Sqm 10,000 TPD Power Electric Sub-Station 11 Local Level 1 @ 10,000 40 Sqm √ KV Community Electric Sub-station 66 2,500-4,000 2 @ 1 Lakh √ Level KV Sqm Electric Sub-station 220 7,000-10,000 Sub-City Level 1 @ 5 Lakh √ KV Sqm Electrical Sub-station City Level 1 @ 20 Lakh 4.0 ha √ √ 400 KV 22.7 Designated Use Zones and Use Premises 22.7.1 Each Use Zone comprises of several Use Premises that are distinct. The Use Premises further comprise of compatible activities and these can be developed either as standalone plots (assigned for each Use Premise) or in form of integrated/ comprehensive schemes (like District Centres, Community Centres, etc.). i. Each Use Premises shall be permitted to have specific Uses / Use activities. ii. The location and boundaries of each use premises shall conform to as specified in the Layout Plan. iii. Any change in the location, boundaries and predominant use of use premises due to any reason whatsoever and duly approved shall be incorporated in layout plan.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 648 22.8 Residential A. Use Premises and Definitions Table 22. 3 : Use Premises and Definitions - Residential S. No. Use Premise Definition 1 Group Housing A premise of size not less than 3000 sqm (2000 sqm. for slum/ JJ rehabilitation area/Special Area/Village (Lal Dora/Firni) /Extended Lal Dora) comprising of residential flats with basic amenities like parking, park, convenience shops, public utility etc. 2 Plotted Premise for one or more than one dwelling unit(s) and Housing may have on it one or more main building block and other * accessory block for garages and service personnel. 3 Studio Premise for residential flats with carpet area** 40-60 Apartment sq.m units. 4 Dharamshala or Premise providing temporary accommodation for short its equivalent duration. 5 State Bhawan/ Government owned premise for providing the transit State accommodation for the guests of State Government and Guest Central Government. House 6 Affordable Premise for temporary accommodation facilities with Public residential flats and dormitories with common amenities Renta with or without dining facility. l Housing 7 Slum Premise for residential flats provided for beneficiaries as Rehabilitation part of slum area resettlement/ rehabilitation. Scheme 8 Hostel A premise in which residential accommodation in the form of rooms is provided. 9 Rain A premise having the facility for providing the night Baser accommodation to individuals without any charges or with a (Night Shelter) token charges. It may be run by local government or voluntary agencies*** 10 Guest House, A premise providing temporary accommodation for short Lodging & durations. Boarding House 11 Low Existing farm houses in urban extension regularised as Densit per y Residential Policy and new Low Density Residential Plots to be Plot permitted in the Green Development Area. 12 Foreign Mission Premise for the Foreign Mission. Note: 1. *Pre 1962 plotted double storied flats shall be treated as Residential Plots. 2. *Bed and Breakfast accommodation may be a permissible activity in residential plot/ flat, if registered under the Scheme notified by Ministry of Tourism, GoI/ GNCTD from time to[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 649 time. 3. ** Carpet Area definition to be taken as per RERA 4. ***As land is a constraint, the endeavour should be to optimally utilize the land for creating multipurpose facilities in residential and PSP plots. Night shelter should also be made in existing buildings and in new proposed constructions within the Railway Terminals, Bus Terminals, Wholesale/Retail markets, Freight Complexes, Police Stations etc. by the agencies concerned such as Railways, Health, Industry, DTC, Police, etc., wherever available, with suitable modifications into night shelters as well as by adopting innovative concepts such as integrated complex with commercial space on the ground floor and night shelter on the first floor. B. Permissible Activities Table 22. 4 : Use Premises and Activities Permitted: Residential S. Use Zone Residential Area (RD) No Use 1 2 3 4 5 6 . Premise Group Plotted Studio Dharamshala State Affordable Housing Housing Apartment orits Bhawan/ Rental equivalent State Housing Activities Guest House Permitted 1 Residence (Plotted) 2 Residential (Flats) 3 Retail Shops (on ground floor with an area up to 20 Sq.m. each) 4 Mixed use activity 5 Society Office / Registered RWA Office 6 Community Room/ Basti Vikas Kendra 7 Crèche / Day Care Centre/ Anganwari 8 Senior Citizen Recreation Room 9 Recreational Club/ Hall 10 Swimming pool 11 Religious 12 Dormitory 13 Guest Room 14 Dining Area 15 Watch and[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 650 Ward Residence (20sqm) 16 Conference Hall and related facilities 17 Government office 18 Souvenir shops 19 Restaurants 20 ATM 21 Staff Residential Accommodat ion 22 Garage 23 Fair Price Shop C. Development Control Norms Table 22. 5 : Group Housing Use Minimu m Maximum Ground FAR Min. Height (M) Premise Plot Area Coverage ROW (M) Group 3000 33.33% 200 18 NR Housing sq.m. (in case of addition/ (Subject to alteration of existing DUs clearance from for availing balance FAR, AAI/ Fire Dept. ground coverage upto and other 40% may be allowed) statutory bodies) Other Controls i. The upper limit of density will be taken as 200 DUs/ha (900pph) with flexible Dwelling Unit sizes to achieve optimal utilization of land. The Central Government in consultation with the DDA may relax density and other norms for public housing and projects of national importance. ii. Group Housing plots in Special Area / Village (Lal Dora / Firni) / Extended Lal Dora/ unauthorised colonies shall be 2000 Sqm. and roads with minimum RoW 7.5m. These conditions are subject to meeting parking requirements within the plot and NOC from the Traffic Police Deptt. and the Delhi Fire Service (DFS) of GNCTD. Such plots shall be incorporated as group housing plots in the Development/Layout Plans of these areas to be prepared, subsequently, if such, plans are not already approved. iii. Additional floor area of 400 sq.m. or at the rate 6% of permissible FAR, whichever is less shall be allowed, free from FAR, to cater to community needs such as community / recreational hall, crèche/ day care, library, reading room, senior citizen recreation room / club and society office. iv. Ground coverage up to 40% may be allowed to achieve low-rise high-density housing. v. The developer shall ensure that minimum 15% of the proposed FAR (over and above 200 permissible FAR and density of 200 DUs/ha), to be constructed for Community- Service Personnel / EWS and lower category. Such flats shall have a carpet area of minimum 32 sq.m. Following are the conditions for these EWS DUs: a. 50% of the EWS Housing Stock shall be retained by Developer Entity (DE) and disposed only to the Apartment owners, at market rates, to house Community Service Personnel (CSP) working for the Residents/Owners of the Group Housing. These will be developed by DE at the respective Group Housing site/premises or contiguous site.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 651 b. Remaining 50% of DUs developed by DE for EWS housing purpose will be sold to the eligible beneficiaries identified by DDA/ Local Bodies as per DDA Policy. These can be developed by DE at an alternate nearby site. c. Necessary Parking, Commercial and PSP facilities shall also be provided by the DE for this separate housing pocket. d. The EWS housing component created by the DE shall be subject to quality assurance checks, as prescribed in this regard by Govt./DDA. The final handing/taking over of this component shall be subject to fulfilling the quality assurance requirements. e. The DE shall be allowed to undertake actual transfer/transaction of saleable component under its share/ownership to the prospective buyers only after the prescribed land and EWS housing component sold / transferred to the eligible beneficiaries identified by DDA / local bodies at the rates prescribed by DDA. vi. Employer Housing of Central Government, State Government and other Government Agencies are not required to follow the requirement of FAR or Dwelling Units for Community Service Personnel / EWS and lower income category. Table 22. 6 : Plotted Housing Use Minimum Plot Area (sq.m.) Max. FAR Max. Height (M) Premise Ground No. of Coverag DUs e (%) Plotted 1 Up to 50 90* 350 3 15m (without stilt) Housing 2 Above 50 to 100 90* 350 4 17.5m (with stilt) 3 Above 100 to 250 75** 300** 4 4 Above 250 to 500 75 225 6 Subject to 5 Above 500 to 750 60 225 6 clearance from Fire 6 Above 750 to 1000 50 200 9 Dept. for individual plot 7 Above 1000 to 1500 50 200 9 8 Above 1500 to 2250 50 200 12 9 Above 2250 to 3000 50 200 15 10 Above 3000 to 3750 50 200 18 11 Above 3750 50 200 21 Other Controls i. For the purpose of density calculations, the dwelling unit shall be considered to accommodate 4.5 persons and the servant quarter to accommodate 2.25 persons. ii. The local body concerned shall be competent for the following a) to disregard variation of up to 2% in plot size, arising from conversion of area from sq. yard to sq.m. b) *100% ground coverage norms applicable to the preceding category of plot size shall be eligible for regularization of construction, already existing as on 22.09.06 on payment of charges as notified. c) **100% ground coverage and 350 FAR shall be eligible for regularization of construction already existing as on 22.09.06 on payment of charges as per the notification, in respect plot size between 100 to 175 sqm. iii. Minimum size of the residential plot shall be 32 sq.m. iv. The additional number of dwelling units would be subject to payment of levy for the augmentation of civic infrastructure. v. The total ground coverage and FAR permissible in any plot shall not be less than that permissible for the largest plot in the next preceding category. vi. Maximum height of the building shall be 15m in plots without stilt parking and 17.5m in plots with stilt parking. Such residential building shall not be considered as high rise building. For purpose of fire and life safety requirements, clearance of Fire Department will be obtained by the individual plot owner.Subdivision of plots is not permitted. However, if there are more than one.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 652 vii. Subdivision of plots is not permitted. However, if there are more than one building in one residential plot, the sum of the built-up area and ground coverage of all such buildings, shall not exceed the built-up area and ground coverage permissible in that plot. viii. Amalgamation of two plots adding up to maximum of 64 sq.m. shall be permitted with following conditions: a) Local Body will simultaneously modify the Layout Plan. b) The maximum ground coverage, setbacks, parking, Dwelling Units etc. shall be for the amalgamated plot size. c) The maximum FAR permissible shall not be less than the permissible in case of two individual plots. ix. The mezzanine floor, if constructed, shall be counted in the FAR. x. Provision of stilt shall be mandatory for plots with area of 100 sq.m upto 750 sq.m. For plots above 750 sq.m., parking shall be provided in the setback/ stilt to achieve parking/ECS as per MPD norms. If the building is constructed with stilt area of non-habitable height (less than 2.4m), used for parking, such stilt area shall not be included in FAR but would be counted towards the height of the building. xi. Number of servant quarters shall be provided as per approved layout plan and shall be constructed within the stipulated height. However, if the garage block space is merged with the main building, no separate servant quarter block or servant quarter, as part of main building shall be allowed. However, provision for a servant’s room as part of the dwelling unit within the permissible coverage FAR shall be allowed. xii. Provision for a servant’s room (with a floor area not less than 11 sq.m. exclusive of cooking verandah, bathroom and lavatory) as part of the dwelling unit, within the permissible FAR with stipulated height restriction, shall be allowed. The maximum size of servant quarter shall be 25 sq.m. If larger in size, the servant’s quarter shall be counted in density as a full dwelling unit. xiii. Standard Plans: There are a number of standard building plans designed and approved by the Authority. Such plans shall continue to operate whenever applicable. Such plans shall be modified as per the applicable development controls. xiv. Encroachment on public land shall not be regularized and shall be removed before the local body grants sanction for regularization of additional construction or height except the following: a) Projections / chajjas / covered chajjas built up portion which existed before 7.02.2007 upto 1m above 3m height from the ground level shall be regularized for plot size upto 175 sq.m on roads below 24m ROW in pre-1962 colonies (except for A & B category), in unplanned areas (including special area, village abadi and unauthorized regularized colonies) and resettlement colonies. The owners /occupiers shall have to obtain structural safety certificate and fire clearance within a reasonable period of time as notified by the Government. Such projections / built up portion thereon shall be counted in FAR and in case of excess FAR over and above permissible FAR, such FAR in excess shall be regularized subject to payment of appropriate charges as approved by the Government. b) The local body concerned shall carry out a survey of all such projections eligible to be regularized and put such list in public domain for objections from the occupiers / owners and any person of the public against inclusion / exclusion of such projection in the list and the list thereafter will be finalized within a period of one month after considering such objections received in writing. xv. Every applicant seeking sanction or regularization of additional FAR and/ or height shall submit a certificate of structural safety obtained from a structural engineer. Where such certificate is not submitted or the Building is otherwise found to be structurally unsafe, formal notice shall be given to the owner by the local body concerned, to rectify the structural weakness within a reasonable stipulated period, failing which the building shall be declared unsafe by the local body concerned and shall be demolished by owner or the local body.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 653 xvi. The minimum setbacks shall be as given in the following table: Table 22. 7 : Minimum Setback Norms for Residential Area- Plotted Housing S. No Plot size (sq.m.) Minimum Setbacks (in metre) Front Rear Side 1 Side 2 1 Below 100 0 0 0 0 2 101 upto 250 3 0 0 0 3 251 upto 500 3 3 3 0 4 501 upto 2000 6 3 3 3 5 2001 and upto 10000 9 6 6 6 6 Above 10000 15 9 9 9 a. In case the permissible ground coverage is not achieved with the above- mentioned setbacks in a plot, the setbacks of the preceding category may be permitted. b. A minimum 2m x 2m open courtyard/service duct shall be provided in residential plots of area of 50 sq.m. to 100 sq.m. Table 22. 8 : Studio Apartment Use Minimum Maximum FAR Minimum Height (M) Premise Plot Area Ground ROW (M) Coverage Studio 2000 33.33% 200 12 NR Apartment sq.m. (Subject to clearance from AAI/ Fire Dept. and other statutory bodies) Other Controls i. The maximum carpet area of flat will be 60 sq.m. ii. Additional floor area 400 sq.m or at the rate 6% of permissible FAR, whichever is less shall be allowed free from FAR to cater to community needs such as community / recreational hall, crèche, library, reading room, senior citizen recreation room / club and society office. Table 22. 9: Dharamshala Use Premise Minimu Maximum FAR Minimum Height m Plot Ground RoW (M) (M) Area Coverage 500 Dharamshala 30% 120 - 15 sq.m. Table 22. 10: State Bhawan/State Guest House Use Premise Minimum Maximum FAR Minimum Height Plot Area ROW (M) (M) Ground Coverage State -- 50% 200 -- NR Bhawan/State (Subject to clearance from Guest House AAI/ Fire Dept. and other statutory bodies)[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 654 Other Controls i. In case of Sub-Zone D-13 of Zone-D, the maximum height shall not exceed 26m (Subject to Fire and other statutory/ security clearances that may be required from time to time). Table 22. 11 : Affordable Public Rental Housing Use Premise Minimu Maximum FAR Minimu m Height m Plot Ground ROW (M) (M) Area Coverage Affordable 2000 33.33% 200 12 NR Public Rental sq.m. (Subject to clearance Housing from AAI/ Fire Dept. (APRH) and other statutory bodies) Other Controls i. Additional floor area of 400 sq.m. or at the rate 6% of permissible FAR, whichever is less shall be allowed, free from FAR, to cater to community needs such as community / recreational hall, crèche/ day care, storage facilities and society office. ii. APRH could be constructed, operated and maintained by any entity, including Government Bodies or could be handed over to a Concessionaire (Private Entities) for operation and maintenance, as per Model-I (Converting existing Government funded vacant houses into Affordable Rental Housing through Concession Agreement) of the ARHC Scheme of Govt. of India. iii. Affordable Rental Housing (ARH) can be on PPP basis (Model II) a. ARH constructed through this model will consist of a mix of Dwelling Unit (upto 32/60sqm carpet area each for single/double bedroom respectively) and Dormitory of 4/6 beds (upto 10 sqm carpet area per bed) including all common facilities. b. A single project of ARH shall have at least 40 DU (double bedroom/single bedroom) or equivalent dormitory beds (1 single bedroom unit of upto 32 sqm carpet area is considered equivalent to 3 Dormitory beds). c. There will be flexibility to Private/Public Entities to have any mix of single/double bedroom and dormitories (4/6 units). However, to ensure that such complexes are used for urban migrant/poor or EWS/LIG category and not misused for any other purposes, a ceiling of maximum tenure of License has been provisioned. iv. Commercial component up to 10% of permissible FAR in the premise may be permitted which could be rented or sold by the Entity. v. All the residents in the ARH shall occupy the house on the basis of License rights provided by the Owner of the Housing Complex to them. vi. The Maximum Tenure of such Licenses shall not be more than three years. vii. The License deed should not be renewable beyond the maximum tenure. viii. In an ARH Complex it shall be the obligation of the owner of the Housing complex that: (a) He does not charge any premium towards grant of license to any resident. (b) No resident is allowed to continue residing in the house / complex beyond the maximum tenure of license by re-executing a license. ix. The Modalities with respect to ARH shall be as per the Operational Guidelines for the Affordable Rental Housing Complexes as issued by Ministry of Housing and Urban Affairs, Govt. of India and as per approvals of DDA. x. In case where the provisions in the guidelines are not explicit, separate Development Control Norms shall be prescribed, subject to approval of DDA/Authority.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 655 Table 22. 12 Slum Rehabilitation Use Premise Minimum Maximum FA Minimum Height Plot Area Ground R ROW (M) (M) Coverage Slum 2000 No restriction on 400 9 NR Rehabilitation sq.m.* ground coverage (Subject to (except clearance from setbacks) for flexibility in AAI/ Fire Dept. design of the and other rehabilitation statutory bodies) project Other Controls 1. (*) In case of public housing, the Technical Committee of DDA may relax minimum plot size 10%. 2. The following are guidelines for slum rehabilitation (with site-specific relaxations may be adopted as required). i. The upper limit of density for Slum & JJ clusters (In-situ up-gradation/ Rehabilitation/ Redevelopment of Slum & JJ Clusters, Resettlement Colonies) and EWS Public Housing Schemes be maximum 900 DUs/ ha. ii. The land area for rehabilitation of slum/JJ Cluster shall be taken up on PPP through prescribed land monetisation as per Slum Rehabilitation Regulations/ Policy. The minimum residential component of the land area for slum rehabilitation scheme has to be 60% and maximum area for remunerative use 40%. iii. The scheme shall be designed in a composite manner with an overall maximum FAR of 400 on the residential component, (beneficiary i.e. 60%) of the land. The maximum FAR of 300 on the remunerative component of the land shall be as applicable irrespective of the land use. iv. Any use/mix of uses shall be permitted in the remunerative component as per MPD provisions. In case the DE proposes a mix of uses, the parking and development control norms shall be applicable on a pro-rata basis, on the FAR utilised for each use. v. 10% of the permissible residential FAR shall be utilised for commercial development as an integrated scheme. No separate plot shall be delineated for use of this FAR. vi. In addition to the above, 10% of the permissible residential FAR may be permitted for development of community work centres for home based economic activities (Household Industries as per MPD norms). vii. Specific situations may require clubbing of scattered squatters within one site to work out an overall comprehensive scheme. Slum & JJ Clusters on plots smaller than 2000 sqm be relocated instead of taking up in-situ rehabilitation as per the above-cited guidelines. viii. Buildings may be recessed on different floors to create incidental spaces shared between DUs in a cluster. ix. Green areas shall be encouraged in schemes where a larger central green/ open space is not feasible, smaller green areas shall be provided. x. Schemes shall be approved by concerned body. xi. Schemes / designs should be compatible for differently-abled persons.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 656 xii. Norms for Social and Physical Infrastructure shall be as per DCN Table 22. 13 : Hostel Use Minimum Maximum FAR Minimum Height Premise Plot Area Ground ROW (M) (M) Coverage (sq.m) Hostel 500 30 120 -- 15 Other Controls i. These norms shall not be applicable for hostels under Mixed Use. ii. Norms for working men-women hostels shall be as per provisions under “Other Community Facilities”. Table 22. 14 : Rain Basera (Night Shelter) Use Premise Minimum Maximum FAR Minimum Height Plot Area Ground ROW (M) (M) (sq.m) Coverage Rain Basera 100 60 200 -- 26 (Night Shelter) Table 22. 15 Guest House, Lodging & Boarding House Use Premise Minimum Maximum FAR Minimum Height Plot Ground ROW (M) (M) Area Coverag (sq.m) e Guest House, 500 30 120 -- 15 Lodging & Boarding House Other Controls i. These norms shall not be applicable for Guest House under Mixed Use. Table 22. 16 : Low Density Residential Plot Use Premise Minimum Maximum FAR Minimum Height Plot Area Ground ROW (M) (M) Coverage Low Density As per Green Development Residential Area Plot Table 22. 17 : Foreign Mission (RF)[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 657 Use Premise Minimum Maximum FA Minimum Height Plot Area Ground R ROW (M) (M) Coverage Foreign -- 25% 75 -- 15 Mission Other Controls i. Basement up to the building envelope line to the maximum extent of 50% of plot area shall be permitted. The basement area, if used for parking and services, shall not be counted in FAR. ii. As part of approved layout plan following use premises shall be permitted in Foreign Mission sub-use zone: Foreign Mission, Housing (for the Mission Employees), Guest House, Local Shopping, Bank, Recreational Club, Health Centre - Hospital, Tertiary health care centre, Dispensary, Integrated Residential School, Cultural and Information Centre, Police Post, Fire Station, Post and Telegraph office Other controls relevant for Residential Use Zone 1. Community facilities and local facilities shall be provided as per norms. In addition to this, the following shall be considered for provision of these facilities: i. These facilities should preferably be located along internal roads with minimum 12 m ROW, unless specified. The development of the infrastructure should be monitored to assess the achievement in the relevant sectors. ii. Parking requirements shall be as per the parking norms. iii. The minimum size of tot lot at cluster level shall be 125 sq.m. iv. The location of schools and Anganwaris should be made in the layout plan in cluster form to facilitate sharing of common parking space and playground. v. The planning of physical infrastructure i.e. Underground Tank, Sewerage- pumping System, Rainwater harvesting, Dual pipe system, Area for segregation of waste, Electric substation, Pole mounted electric transformers, decentralised sewerage treatment should be provided as per norms. 2. Planning of the residential neighbourhood regarding circulation system, including safety requirements shall be governed by the BIS standards or as per the norms of the concerned agencies. 3. Suitable landscape plans for the neighbourhood shall be prepared for development of the parks and roadside plantation etc. 4. Schemes / designs should be compatible for differently abled persons. 5. All plans, Layout and Schemes shall be approved by concerned agencies. 6. Basement, if constructed, and used only for parking, utilities and services shall not be counted towards FAR. 7. Stilts: If the building is constructed with stilt area of non-habitable / stipulated height and is proposed to be used for parking, landscaping etc. the stilt floor need not be included in FAR and shall be counted towards height. 8. Parking shall not be allowed in the mandatory Fire Tender movement road. 9. Levy on additional FAR shall be at rates notified with the approval of Government from time to time. 10. Lower norms may be adopted in special cases, as specified in relevant regulations or as per approval of the Authority.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 658 22.9 Commercial 22.9.1 General Business and Commerce A. Use Premise and Definitions Table 22. 18 : Use Premise and Definition – Commercial S. No. Use premise Definition 1. Retail Shop A premise for sale of commodities directly to consumer with necessary storage. 2. Repair Shop A premise equivalent of a of a retail shop for carrying out repair of household goods, electronic gadgets, automobiles, cycles etc. 3. Personnel A premise equivalent of retail shop providing Service Shop personnel services like tailor barber etc. 4. Vending Booth/ A premise in the form of booth for sale of commodities of Kiosk daily needs either through a mechanical installation or otherwise. 5. Convenience A group of shops in residential area serving a population Shopping Centre of about 5,000 persons. 6. Local A group of shops in residential area serving a Shopping population of 10,000persons Centre 7. Office A premise used for offices etc. 8. Bank A premise for offices to perform banking function and operation. 9. Motor Garage A premise for servicing and repair of automobiles. and workshop 10. Cinema / Cineplex A premise with facilities for projection of movies and / Multiplex stills with a covered space to seat audience. 11. Restaurant A premise used for serving food items on commercial basis including cooking facilities. It may have covered or open space or both for sitting arrangement. 12. Professiona Professional activities shall mean those activities l Activities involving services based on professional skills namely Doctor, Lawyer, Architect, and Chartered Accountant, Company secretary, Cost and Works Accountant, Engineer, Town Planner, Media professionals and Documentary Film maker, Management Professionals and Dietician/ Nutritionists. 13. Weekly Market An area used once in a week by a group of informal shop establishments in the form of a market. These markets shift from one area to another on different days of the week.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 659 14. Informal Retail/ service unit, stationary or mobile, working Sector Unit without roof including small khokhas on roadside. Street vendor- A person who offers goods or services for sale to the public without having a permanent built up structure but with a temporary static structure or mobile stall (or head load). Note: Small Shop: Shop of maximum 20 sqm area, trading in or dealing with retail and personnel services, excluding: Retail shops of building materials Repair shops/ workshops of automobiles, tyre resoling and re-treading, and battery charging, Storage, go-down and warehousing, Junk shop (except paper and glass waste), Liquor shop, Printing, dyeing and varnishing. B. Permissible Activities Table 22. 19 : Use Premise and Activities Permitted – Commercial S. Use zone RD C1 No. Use Premise 1 2 3 4 5 6 7 8 MC Convenienc Local Servic Inform Commun NHC District C e Shopping Shoppin e al ity Centre Centre/ Centre g Centre Marke t Bazaar (CC) Sub CBD/ (CSC) (LSC) Sub City Level Commerc Activities ial Areas Permitted 1. Retail Shop Small Small Sho Shop p s s 2. Vending Booth/ Kiosk 3. Stockists and dealers of medicine s and drugs 4. Fair Price Shop 5. Repair / Service 6. Personnel Service Shop[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 660 7. Office 8. Offices of local bodies, PSUs 9. Conference Facility 10. Cinema, Cineplex , Multiplex 11. Hotels 12. Guest House 13. Service Apptts 14. Restaurants 15. Banque t Halls 16. Socio- Cultural activities / Recreationa l Club/ 17. Coachin g Centres/ Training Institutes 18. Police Post, Fire Post. 19. Petrol Pump / CNG Station 20. Bus Terminal 21. Multi-level parking 22. Service Market, Motor Garage and Workshop 23. Bank 24. ATM 25. Informal Sector unit[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 661 26. Nursing Home/ maternity etc. 27. Dispensary, Clinical Lab, 28. Clinic and Polyclinic 29. Path lab, Diagnosti c Facility1 30. Spa, Gym and Salon 31. Museum/ Art Gallery 32. Crèche / day care 1Subject to controls and safety considerations Notes: i. Utilities, Public Conveniences shall be provided as per norms. ii. The mandatory requirement of parking as per prescribed standards would be met through multi level parking as far as possible in Metropolitan City Centre, District Centre and Community Centre. C. Development Control Norms Table 22. 20 : Commercial S. Use Premise Nos Min. Max FAR Min Height No. Plot Ground ROW (m) Area Coverag (sqm)/ e unit A. Local Population upto 10,000 1 Convenience 2 1000 50% 100 12 NR Shopping Center (CSC) 2 Local Shopping 1 3000 50% 100 18 NR Centre (LSC)[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 662 Other controls: i. In case of integrated schemes of Commercial Centres, amalgamation and subdivision of the plots is permitted for permitted uses of the respective hierarchy of commercial centres subject to payment of requisite charges as notified by the Competent Authority from time to time. ii. Max. 10% additional Ground Coverage shall be allowed for providing atrium only in LSC. iii. In case the permissible additional ground coverage for atrium is utilised, 25% of the utilized ground coverage shall be counted towards FAR. 3 Service Market 1 2000 50% 100 18m NR 4 Informal sector 1 1000 50% 40 18m NR market About 10% of the unutilized sites of LSC / CSC may be converted into Service Markets. S. Use Zone Nos Min. Max FAR ROW Height No. Plot Ground (m) Area Covera (min) (sqm)/ g e unit Commercial Centres Community Population 1,00,000 1 Community 1 20,000 50% 125 24m NR Centre (CC) i. Maximum 10% additional ground coverage shall be allowed for providing atrium. In case the permissible additional ground coverage for atrium is utilised, 25% of the utilized ground coverage shall be counted towards FAR. ii. Maximum 10% of FAR may be permitted for service market and/or informal market Sub-City Population 5,00,000 1 District Centre 1 50% 150 30m NR (DC) / Sub- 10 ha Central Business District / Sub- City Level Commercial areas i. Maximum 10% additional ground coverage shall be allowed for providing atrium. In case the permissible additional ground coverage for atrium is utilised, 25% of the utilized ground coverage shall be counted towards FAR. ii. Maximum 10% of FAR may be permitted for service market and/or informal market City Population 20,00,000 Metropolitan City Centre /CBD[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 663 1 Commercial - - 25% 150 As NR Plot: Retail & existin Commerce g Metropolitan City Centre i.e. Connaught Place & its Extension Other Controls i. The size of the plot shall be as in the layout of commercial area, any subdivision of the plot in Connaught Place and its extension should not be permitted. ii. The development controls shall be in accordance with the comprehensive plan of the area to be reframed by the local body. a. In case of Connaught Place, the existing height shall be maintained and FAR could be achieved by increasing proportionate ground coverage. b. No basement shall be permitted in middle circle of Connaught Place. c. Mandatory Architectural Controls shall be applicable iii. For plots developed as part of comprehensive schemes, the permissible FAR shall be as per the valid lease deed. 2 Commercial - - 25% 150 As NR Complex at Fire existin Brigade Lane g and Janpath Lane i. Ground coverage and FAR shall be calculated on the area of presently available plots. ii. The area shall be developed on the basis of comprehensive scheme. Any other commercial centre 1 Non-hierarchical - - 50% 125 - NR Commercial Centre (NHCC) 2 Including Up to 3 25% 100 NR Commercial ha. component along with Railway / MRTS Stations / ISBT Subject to statutory clearances. The development controls can vary subject to approved scheme. 3 Asaf Ali Road - - 80% 200 18m 20 (the area shown as commercial strip in Delhi Gate – Ajmeri Gate scheme) Setbacks are not mandatory. In case of rebuilding stilts shall be provided for parking.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 664 4 Existing 1200 50% a. 100 18m 15m Temporary sqm- subject subject Cinema 4000 to min to max. (minimum 300 sqm setback built-up seater in one or s as per area of more cinema hall) In case MPD to 3000sqm a be cinema adhered b. In has case plot more size is land, the more rest of than the area 4000 would be sq.m., kept and is green. located on 24m ROW and above, max. built-up area not to exceed 4000sqm a. New Temporary cinemas shall not be permissible, however already existing Temporary Cinemas shall be allowed to continue on permanent basis as per the stipulated conditions. b. Commercial activity shall be permissible after excluding the space required for capacity of 300 seated cinema hall. The commercial space will be for the activities as permissible for Local Shopping Centre (LSC) c. Cinema would confirm to the Cinematography act and other statutory provisions. Multiplexes shall accordingly be permissible. d. Land use conversion charges, FAR charges, betterment levies and other charges will be levied as approved by the Government from time to time. e. The Temporary Cinema existing on Government Land shall not continue. f. The excess land in such cases if required for larger public purposes shall be acquired and developed as per the norms by the concerned local agencies. g. It should be ensured that adequate parking facilities are provided within the respective plot areas.] h. The local body and Licensing Authorities shall ensure that the above conditions are compiled before renewing the license. i. Individual cases will be processed as per the above provisions Other controls for Any other commercial centre i. Subject to statutory clearances. The development controls can vary subject to approved scheme.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 665 Other Controls i. Additional FAR Charges, Conversion Charges, Betterment Levy/ External Development Charges etc. shall be payable as decided by the Government from time to time. ii. No restriction subject to clearance from Airport Authority of India and Fire Department of GNCTD. iii. Ground Coverage up to 50% instead of 40% will be permissible to achieve the enhanced FAR at site(s), in case of any height restriction from Airport Authority of India. iv. NR - No Restriction, subject to clearance from AAI, Delhi Fire Service and other statutory bodies. v. FAR: The norms of 325 FAR below 30m ROW or 375 FAR on 30m ROW or above and 40% ground coverage shall be applicable in respect of all (I) hotels including hotel plots in Commercial Centres Community Centre, District Centre/ Sub- Central Business District/ Sub City Level Commercial Areas and Metropolitan City Centre/Central Business District except those located in LBZ area, Civil Lines Bungalow Area and hotels existing on heritage structures and (II) Hotel-cum- commercial plots. This shall apply to all categories of hotels mentioned in Clause 4.4. The FAR for Commercial Centres and Metropolitan City Centre/Central Business District as well as Hotel-cum-commercial plots where apportionment of FAR shall be as per original lease conditions and shall stand enhanced automatically to that extent, for this purpose only if not available. vi. The utilities such as, underground water storage tank, roof top water harvesting system, separate dry and wet dustbins, post-delivery counter etc. are to be provided within the plot. All hotels, restaurants, auto workshops, hospitals, tertiary health care centres etc. will have to make arrangements for solid waste disposal and primary effluent treatment. vii. Individual plot with floor area of 5000 sq.m. or above will provide ESS and generator within the plot. They have to submit energy consumption / audit at the time of sanction of building plans. viii. Wherever parking is provided within the plot / basement and is misused, the same is liable to municipalisation / taken over by the authority. ix. Wherever redevelopment of existing commercial areas stipulate preparation of a comprehensive scheme, the same can be initiated jointly by the lessees / owners themselves and submitted to land owning agency / planning authority for approval. Wherever any enhancement in FAR is approved, the same will be subject to charging appropriate levies from the beneficiaries. For Metropolitan City Centre, development controls shall be as per approved scheme. x. In case of integrated schemes of Commercial Centres, amalgamation and sub- division of the plots is permitted for permitted activities of the respective hierarchy of commercial centres subject to payment of requisite charges as notified by the Competent Authority from time to time.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 666 Any other commercial centre Shop cum Residence Plot/ Shop Plots i) Shop-cum-residence complexes (Shop-cum-residence plots / shop plots) later designated as CC/LSC/CSC (as already earmarked / shown in the respective Zonal Development Plans / notified by ULBs / GNCTD) shall be allowed to continue with the activities permissible in the Local Shopping Centre with the following conditions: a. FAR of such plot shall be as prescribed for respective size of the residential plotted development or lease deed / conveyance deed / sale deed / allotment conditions, whichever is more. However, in case total FAR in the existing building is exceeding the permissible FAR on the plots of size above 100 sq.m and upto 250 sq.m., such excess FAR (upto max. 350 FAR) shall be permitted subject to payment of penalty charges as prescribed with the approval of Government. b. Additional FAR shall be permitted on payment of additional FAR charges, as applicable. c. Payment of use conversion charges from “Residential” to ‘Commercial” shall be applicable as prescribed with the approval of Government. d. LSCs, CSCs and shop plots which are already under commercial use zone are not be liable to pay any conversion charges. e. Commercial establishments / shop plots under the above category not having any deviation from already approved layout plans / lease deed / conveyance deed / sale deed are not be liable to pay any additional charges. ii) Other existing shop-cum-residence plots shall also be allowed to continue with original permitted use with the FAR of residential plotted development. The upper floors can be converted to commercial use after paying the applicable charges. iii) The basement shall be permitted in shop-cum-residence plots / complexes later designated as CC/LSC/CSC subject to relevant provisions under mixed use regulations. If such use of basement leads to exceeding the permissible FAR on the plot, such excess FAR shall be subject to payment of applicable charges prescribed with the approval of Government. iv) In all the above cases, owner shall obtain the approval of revised building plans for any addition / alteration / new construction / conversion from the concerned local body subject to all statutory clearances w.r.t. relevant provisions of building bye laws, structural safety, fire safety etc. v) Parking provisions shall be as per prevailing norms for residential plotted development and as stipulated in Table 22.46. Onetime parking charges shall be paid either as down payment or in maximum four instalments subject to payment of applicable charges as prescribed with the approval of Government. vi) In order to meet the parking requirements, concerned local bodies along with concerned traders / establishments / RWAs shall identify and develop the land for providing shared / common `parking. 5% additional Ground Coverage shall be permissible within the scheme area for the provision of public parking. vii) In order to promote parking, the owner of the plot will be allowed to[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 667 amalgamate the plots upto minimum plot size of 1000 sq.m, to provide additional parking on the amalgamated plot. Such plots shall be entitled for a rebate of 50% in conversion charges. viii) In case there is no parking facility available in the vicinity, concerned local body may declare such areas as pedestrian shopping streets / areas. Public transport authority shall ensure last mile connectivity to these areas. D. Informal Sector Informal Sector Market to be incorporated in the planned development of various use zones are as follows: Table 22. 21 : Norms for informal sector trade units S. No. Use Zones / Use premise No. of Informal shops / Units i) Retail trade: Metropolitan City 3 to 4 units per 10 formal shops (to Centre, District Centre, be provided in informal bazaar / Community Centre, service market components) Convenience Shopping ii) Centre, Government and 5 to 6 units per 1000 employees Commercial Offices iii) Wholesale trade and 3 to 4 units per 10 formal shops Freight Complexes iv) Hospital/ Tertiary Health 3 to 4 units per 100 beds Care Centre v) Bus Terminal 1 unit for two bus bay vi) vii) Parks District Parks 8 to 10 units at each major Neighbourhood entry 2 to 3 units parks Residential viii) 1 unit / 1000 population Industrial ix) 5 to 6 units per 1000 employees Railways Terminus / x) To be based on surveys at the time MRTS Stations of preparation of the project. 22.9.2 Wholesale, Warehousing A. Use Premise and Definitions Table 22. 22 : Use Premise and Definition – Wholesale, Warehousing S. Use Premise Definition No[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 668 1 Wholesale market a. A premise from where goods and commodities are sold and delivered to retailers. The premises include storage and godown, loading and unloading facilities. 2 Warehouse/ Storage/ A premise from where goods and commodities Godown/ Cold are stored Storage 3 Integrated Freight Complex A premise to provide facilities for regional and intra-urban freight movement and inter-link with specialized markets in the City. The premise includes storage facilities, servicing, idle parking for goods vehicles and other related functions. B. Permissible Activities Table 22. 23 : Use Premise and Activities Permitted – Wholesale, Warehousing S.N Use Zone C2 o Use Premise 1 2 3 Integrated Wholesale/ Warehouse/ Freight sub city Storage/ Complex markets Godown Activities Permitted 1 Wholesale Shop 2 Warehouse 3 Godown and Storage Storage of Shops non- polluting/ non- hazardou s materials 4 Office 5 Retail Shop (including Personnel Service Shop 6 Hotel/ Restaurants 7 Repair / Service /Motor Garage & Workshop (max 10% of FAR) (4 to 7- Upto 25% of FAR) 8 Night Shelter[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 669 9 Police outpost upto 150 sq.m, Traffic Police Control Room (Max. 25 sq.m.), Fire Post 10 Fuel Station 11 Bus Terminal 12 Multi-level parking 13 Bank 14 ATM C. Development Control Norms Table 22. 24 Wholesale, Warehousing # Use Zone Nos Min. Max FAR ROW Height Plot Groun (m) (max.) Area d (min) (sqm)/ unit Coverage 1 Integrated As per Freight 40% 100 30 NR requirement Complex 2 Wholesale 8 ha 40% 100 30 NR 3 Warehousing 500 70 140 18 15 /Godown/ 501-2000 60 120 18 15 Storage/ 2001-10000 50 100 18 15 Cold Above 40 80 24 15 Storage 10,00 0 Other applicable conditions: In addition to specified norms, the following conditions shall be applicable on all plots/ integrated schemes: i. Warehouses on plots of 1 ha and above with direct access from 30m RoW can be developed as big-box retail. Such plots shall be permitted to have retail activity up to 50% of the permissible FAR on payment of charges as fixed by govt. from time to time. ii. Utilities, Public conveniences shall be provided as per requirement. iii. Height subject to clearance from Airport Authority of India, ASI, Delhi Fire Service (DFS), other concerned authority and statutory bodies. iv. The minimum parking as per Transport development control norms shall be earmarked. Wherever parking is provided within the plot / basement and is misused, the same is liable to municipalisation / taken over by the authority. In case of plots less than 300 sq.m. common parking can be provided. v. 5% extra ground coverage will be provided for stack parking. vi. In case of plots of size 500sq.m. and above, the utilities such as E.S.S., underground water storage tank, roof top water harvesting system, separate dry and wet dustbins, solar heating / lighting system etc. are to be provided within the plot. vii. Additional FAR charges, Conversion charges, FAR charges, betterment levies[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 670 and other charges will be levied as approved by the Government from time to time. viii. In case of individual plots not forming part of any comprehensive / integrated development scheme, the development controls shall be as per already approved scheme / layout plan. 22.9.3 Hotels (C3) A. Use Premise Definition Table 22. 25 : Use Premise and Definition – Hotels S. No Use Premise Definition 1 Hotel A premise having minimum 10 lettable rooms for lodging of and boarding of 15 persons or more on short / long term basis. The premise may include Banquet, Conferencing facilities, Swimming pool, Health Club, Discotheque. Hotels having Heritage Classification and those which have classification above 3 star. 2 Budget Hotel Mid Segment Hotels (i.e. 1-3 stars) 3 Service Premise fully furnished, serviced and self-contained with Apartment meal preparation and used for short-term or long-term individual, family or corporate accommodation. Premise may also include conference facilities and office space. 4 Motel A premise providing lodging and free parking facilities, typically a roadside hotel having rooms adjacent to an outside parking area. B. Permissible Activities Table 22. 26 : Use Premise and Activities Permitted – Hotels S. Use Zone C3 No. Use Premise 1 2 3 Hotels Budget Hotel Service Apartment Activities Permitted 1. Service Apartment 2. Guest Room 3. Guest Suite 4. Banquet 5. Conference Facility 6. Restaurants 7. Swimming Pool 8. Health Club 9. Food Court 10. Discotheque 11. Office[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 671 12. Retail and Service Shop 13. Dining and related facilities 14. Watch and Ward (upto 20sqm) C. Development Control Norms Table 22. 27 : Hotels S. Use Nos Min. Plot Max FAR ROW Height No Zon Area Groun (m) e (sqm)/ d Coverage (min) unit 1 Hotel 40% a. below 30m 12 NR - ROW - 325 (includi ng b. 30m and above Hotel ROW - 375 Plots) 2 Budge 1200 50% 100 - NR t Hotels 3 Service 2000 30% 225 18 NR Apartm ent Other controls for above (1, 2 and 3) i) Maximum 20% of the FAR can be used for the Commercial offices, Retail & Service shops. 4 Motels - 40% 175 30 NR i. Maximum 175 FAR shall be permissible on the plot area disclosed in the sanctioned plan as on 07-02-2007 in conformity with Government of India Notification S.O. 550 (E) dated 16-06-1995 and motel guidelines issued by Government of India, MoUD on 04-03-2002. ii. Ground Coverage up to 50% instead of 40% will be permissible to achieve the enhanced FAR at site(s), if there exist any height restriction from Airport Authority of India. iii. Additional FAR Charges, Conversion Charges, Betterment Levy/ External Development Charges etc. shall be payable as decided by the Government from time to time. iv. The motels shall face the road of minimum 30 mts. ROW (if additional land is required for road widening, same to be kept reserved out of the motel area). v. Other norms and permissible activities shall be the same as applicable to hotel use premise. vi. Water, electric supply, sewerage, drainage, traffic circulation, provision of linking road of adequate ROW and other such infrastructure shall have to be provided by the owner at their own cost till the same is made available by the service providing agencies. The Motel owner will have to pay the external development charges including provision of linking road of adequate ROW[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 672 as demanded by the concerned agencies. Other applicable conditions: In addition to specified norms, the following conditions shall be applicable on all commercial plots/ integrated schemes i. Utilities, Public conveniences shall be provided as per requirement. ii. Additional FAR charges, Conversion charges, FAR charges, betterment levies and other charges will be levied as approved/prescribed/ notified by the Government from time to time. iii. Maximum 10% additional ground coverage shall be allowed for atrium. In case the permissible additional ground coverage for atrium is utilised, 25% of the utilized ground coverage shall be counted towards FAR. iv. In case of revision of building plans to avail additional FAR, hotel can avail additional FAR only if adequate parking provision is made within the plot itself. v. The norms of 325 FAR below 30m ROW or 375 FAR on 30m ROW or above and 40% ground coverage shall be applicable in respect of all a. Hotels including hotel plots in Commercial Centres Community Centre/ District Centre/ Sub-Central Business District/ Sub City Level Commercial Areas and Metropolitan City Centre/Central Business District except those located in LBZ area, Civil Lines Bungalow Area and hotels existing on heritage structures and b. Hotel-cum-commercial plots. This shall apply to all categories of hotels. The FAR for Commercial Centres and Metropolitan City Centre/Central Business District as well as Hotel-cum- commercial plots where apportionment of FAR shall be as per original lease conditions and shall stand enhanced automatically to that extent, for this purpose only if not available. vi. In respect of hotels where the building plans stand sanctioned prior to 27.1.2006, parking standard of 3 ECS for 100 sqm of floor area shall be applicable only for the additional FAR which will be availed consequent upon amendment to MPD- 2021. In respect of hotels where the building plans have been sanctioned on or after 27.1.2006, the parking standard of 3 ECS for 100 sqm of floor area shall be applicable to the entire plot. vii. Sustainable Management of waste in hotels & motels will be responsibility of the owner and net pollution discharge should be zero. viii. Modern techniques shall have to be adopted in disposal of waste in motels viz. segregation of solid waste into compostable and non-compostable. Compostable waste should be deposited in localized compost pits; non- compostable should be incinerated in incinerators maintained by the motel, subject to pollution control norms. ix. Revised building plans will be submitted to the local bodies i.e., concerned municipal body/ DDA as the case may be for sanction under building bye laws. x. Height subject to clearance from Airport Authority of India, ASI, Delhi Fire Service (DFS), other concerned authority and statutory bodies. xi. The minimum parking as per Clause 22.12.1 shall be earmarked. Wherever parking is provided within the plot / basement and is misused, the same is liable to municipalisation/ taken over by the authority. 22.10 Industries[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 673 22.10.1 Planned Industrial Area A. Use Premise Definition Table 22. 28 : Use Premise and Definition – Industrial S. No Use premise Definition 1. Industrial Plot A premise for industrial activity with non- hazardous, non-polluting activity. 2. Industrial Flatted A premise having a group of small industrial units with common services and facilities of non- polluting nature. 3. Integrated Industrial A premise for industrial activity with non- Area/ Scheme hazardous, non-polluting activity. It can be mix of plotted or flatted. B. Permissible Activities Table 22. 29 : Use Premise and Activities Permitted – Industry Use Zone M1 S. Use Premise Manufacturing/ Service Industries /Service and Repair No. Plotted Flatted Upt Abov Abo Abov Min. Abov Above o e 50 v e e 400- e 20,00 Activity 50 - 400- 2000 2000 2000 0 Permitted sq. 400 2000 sq.m. sq.m. sq.m. sq.m. m. sq.m. sq.m. – 20,00 0 1 Retail Shop/Repair Shop/ Personnel Service Shop 2 Canteen 3 Warehouse/Storage / Godown related to industrial activity: Upto maximum 10% FAR 4 Offices 5 Watch and ward residence (20 sq.m.). 6 Treatment Plant, ESS 7 Residential for staff/ worker: upto maximum 10% of FAR[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 674 8 R&D Facilities 9 Incubation Centers/ Co-working C. Development Control Norms Table 22. 30 : Industry S. Use Zone M1 No. Use Plot Area Ground FA ROW (m) Height Premise (minimum) Coverag R (minimum) (m) e (maximum) Upto 100 200 9 8 50 sq.m. Plots below Industrial Above 50 - 100 1. 60 200 15 Plotted 400 sq.m. sq.m.: 9 Plots above 100 sq.m.: 12 Above 400- 50 200 12 NR* 2000 sq.m. Above upto 2 ha: 24 40 200 NR* 2000 above 2 ha: 30 sq.m. 400-2000 30 200 12 26 Abov Industrial e 30 200 24 NR* 2. Flatted 2000- 20,000 Above 30 200 30 NR* 20,00 0 *Subject to clearance from AAI / Fire Department and other statutory bodies. # The additional FAR Charges shall be payable as decided by the Government from time to time. Other Controls: i. All industries should have provision for separating the solid waste before disposal. No untreated effluent shall be allowed to be discharged. Primary treatment of the effluent shall be done at the plot level as per requirement. ii. In case of plots upto 60 sq.m., common parking shall be provided whereas for plots above 60 sqm front set back (min. 3 m) shall be provided without boundary wall for parking and loading and unloading. iii. 5% extra ground coverage will be provided for stack parking. iv. In case of plots of size 500 sq.m. and above, the utilities such as E.S.S., underground water storage tank, roof top water harvesting system, separate dry and wet dustbins, solar heating / lighting system etc. shall be provided within the plot. v. Service Centres shall be planned as per plotted industrial area norms.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 675 vi. Upto maximum 10% FAR can be used for office in Manufacturing and Service/ Repair vii. Retail Shop/Repair Shop/ Personnel Service Shop/ Canteen - Upto a maximum 10% FAR or 500 sqm whichever is less. viii. In order to facilitate start-ups and innovation clusters in industrial areas, co- working spaces shall be permitted on industrial plots up to 10% of the FAR without any use conversion. ix. Warehousing shall be permitted on plots with direct access from min. 30m RoW. D. Permissible Uses for Use Conversion in Planned Industrial Areas Table 22. 31 : Permissible Uses for Use Conversion in Planned Industrial Areas S. Permissible Use premises as part of modification Subject to No in layout plan of industrial area/ redevelopment Conditions . scheme* Min Min. Plot RO size W (sq.m.) (m) 1 Commercial Use a. Commercial (except Hotel/Cineplex) - 24 Other Controls i. Activity permitted shall be as per DCN related to the plot size and ROW b. Warehouse/ Storage/ Godown Min 30 Other Conditions 1000sqm i. Industrial plots are eligible for conversion as per . DCN of warehousing ii. Warehouses on plots of 1 ha and above with direct access from 30m RoW shall be permitted to have retail activity up to 50% of the permissible FAR on payment of charges as fixed by govt. from time to time. iii. All loading and unloading facilities are provided within the plot 2 PSP a. Education Facilities: Norms 24 Research & Development Centres, Institutions, related to Vocational Training Centre, ITI/ Polytechnic/ Skilling plot size as centres, Vocational/ Training Institute, Teacher prescribed Training Institute, Management Institute, Coaching by PSP Centres, Other training institutes (commercial & DCNs secretarial training centre), General Colleges, Professional Colleges, College. FAR as per original land use[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 676 c. Health Facilities: Norms 24 Hospital / Tertiary Health Care Centre (up to 100 related to beds) plot size as Other Conditions prescribed Eligible for conversion within the existing development by PSP control norms subject to conditions that number of DCNs beds to be accommodated on a plot shall be worked out {@ 80 sqm} of gross floor area per bed FAR as per original landuse shall be applicable d. Banquet Hall 800 24 subject to specification/ regulations including Fire Norms as may be prescribed. DCN of banquet plot shall be applicable e. Restaurant, Recreational Club, Hostel & Old age Norms as home, Community and Recreational hall, Nursing prescribed by DCNs Home & Health Centre are permitted as part of of original land use modification in layout plan of industrial area. DCN of respective use shall be applicable 3 Group Housing a. Group Housing 3000 24 i. Eligible for conversion within development control norms of group housing along with incentive 1.5 times FAR of permissible FAR of Group Housing. ii. Required Commercial preferably and PSP activity for residential population, and working space up to 15% of Permissible FAR shall also be allowed. Other Controls: i. There shall be no height restriction subject to clearance from AAI, Delhi Fire Services (DFS) and other statutory bodies. ii. The industrial use shall be eligible for conversion to other uses within the existing development control norms, subject to payment of conversion charges computed on current market value and cost of parking as decided by the Government from time to time. iii. Sub-division of larger Industrial plot or amalgamation of Industrial plots will be allowed in existing areas as well as approved schemes/layouts/building plans on these Industrial Plots. iv. Rain water harvesting preferably with rain water storage for re-use ,STP, dual piping system, use of solar PV shall be provided to minimize the additional burden on infrastructure services v. These provisions shall not be permitted on non-conforming/ regularized industrial cluster. vi. The above provisions shall not affect the concerned Supreme Court orders in any manner. vii. For regeneration of industrial areas, a regeneration plan of min. 4 hectares shall be prepared where minimum plot size eligible for regeneration will be 1000sqm. In such redevelopment relaxation in area upto 5% in lower limit of plot size shall be permitted. viii. In the redevelopment of industrial plots, 1.5 times of permissible FAR has already been notified in Notification S.O. 683 (E) dated 01.04.2011 regarding Regulations and Guidelines for Existing Planned Industrial Area, therefore, the incentive of 1.5 times of permissible FAR shall be allowed on all permissible[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 677 uses on industrial plot. E. Parameters for Industrial Units in Different Use Zones and Use Premises Permissibility of Industries in Non-Industrial Use Zones For the industrial classification, the limits of parameters shall be fixed according to the nature of industries, area and the nature of industrial development. Table 22. 32 : Parameters for Industrial Units in Non-industrial use zones S. Use Premises Groups Permitted Conditions No (Refer Annexure) Max. no. Max. of Industrial workers Power Load (KW) 1 Residential a. Plotted housing (Household Activities listed in 9 11 Industries) Annexure 5 / (Annexure 12) b. Village Abadi Activities listed in 9 11 Annexure5 2 Commercial a. Convenience Shopping M1 (Annexure 12) 5 11 Centre, Local Shopping Centre b. Community Centre 9 11 c. District Centre 19 11 d. Service Market, Service (Annexure 12) and -- -- Centre (Annexure 13) 3 Industrial Use a. Plotted development All industries except As per As per those prohibited and need need of Non-polluting & non-hazardous nature, b. Flatted Industries All industries except 1[As per As per those prohibited, and need] need of Non-polluting & non-hazardous nature, excluding industries producing noise / water / vibrations / odour pollution Other Controls: i. Maximum no. of workers shall be as per notification issued by the Competent Authority from time to time. ii. The power requirement for operating pollution control devices and non- manufacturing use shall be over and above the aforesaid permissible load.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 678 22.10.2 New Industrial Areas i. New industrial activity in the NCT of Delhi should be restricted to hi-tech and service-based industries (Annexure 12). These activities shall be permissible in existing industrial areas subject to the payment of infrastructure upgradation charges to be decided and recovered by concerned Authority / local body. ii. Industrial Use Zone - Guidelines The subdivision of industrial use zone into use premises and subsequent approval of layout plans for industrial estates shall be governed by the following norms: a) DE/ DDA shall prepare layout plan/ regeneration plan based on the following options. Table 22. 33 : Land distribution in New Industrial Area (Integrated Scheme) Use Premise Percentag e of land Industrial (Net Area) 50% Residential*: workers housing 20% Recreational: Buffer Zone, Parks, Water Bodies, Green under HT 7%-10% lines, internal paved walkways between zones, open air theatre etc. Other Use permitted: Commercial 2%-3% Shopping Centre, Retail, exhibition space, Guest House / Budget hotels, Lodging and Boarding, Communication, information centres, training centres, R&D facilities, Restaurant etc. Social and Physical Facilities 6%-8% 1. Public and Semi-Public: Fire Station / Fire Post, Police Station / Police Post, Hospital / Tertiary Health care Centre /Dispensary, ITI / Polytechnic, Dharamshala, Night Shelter, Day Care Centre, Working Men-Women Hostel, etc. 2. Utilities: Electric Sub-Station, CETPs, Pumping Stations, Underground Reservoirs / Fire Fighting Tanks and other utilities, etc. solid waste collection centres, water recycling plants etc. Transportation: Circulation, Parking, Walking/cycling paths, 15%-18% Goods Vehicle Parking Fuel Station etc. Total 100 * Regulations for Group Housing shall apply. The housing would be utilised for the workers/ employees engaged in the industrial area. Other controls: i. For Industrial areas (above 1 ha), additional 15% of permissible residential FAR may be utilised to develop affordable rental housing.Warehousing within the plot in, shall be limited to 10% and shall be provided as incidental storage accruing out of the industrial activity in the respective plot (raw material, finished products, etc., storage) ii. Parking norms must be applied as per Clause 22.12.1.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 679 Other conditions for approval of layout plans for Industrial Use Zones: i. All new Industrial Estates/ areas shall have approach from a road of at least 30m ROW. ii. Grease traps should be provided near automobile washing area. iii. New Industrial areas should be located along major arterial roads. Major infrastructure network like CNG, LPG, oil, optical fibre, electricity, etc. to be made available along this corridor through underground pipelines. iv. The provision of CETPs, solid waste separation / treatment plants shall be made at the industrial cluster level. v. Proper disaster arrangements shall be made by the concerned agency. vi. Landscape plans shall be prepared for the area. vii. All industries should have provision of separating solid waste before disposal. Provisions for management of e-waste should be made 22.11 Recreational A. Use Premise and Definitions Table 22. 34 Use Premises and Definition – Recreational S. No. Use Premise Definition 1 Regional Park The area comprising of the Northern, central, South Central and Southern Ridge subject to verification by the Forest Department. 2 City Park/ District A park is an area of natural, semi-natural or planted space set Park/ Community aside for human enjoyment and recreation. It may include areas Park designated for protection/ preservation. 3 Theme A large outdoor area usually based on a particular theme/idea Based/Amusement featuring various attractions, such as rides, games, as well as Parks other events for entertainment purposes. 4 Multipurpose An open space for multiple public activities/functions with Ground recreational facilities. 5 Archaeological Archaeological Park is an area which combines assets of heritage Parks value with ecologically sensitive assets. 6 Historical Historical complexes identified as having a degree of historic and/ Monuments or socio-cultural significance. 7 Biodiversity Parks These are special parks with unique landscape that serve as nature reserves for the area and harbor of native flora and fauna. 8 Green Buffer Buffers are green areas/ corridors developed along water bodies, natural drains, HT Lines, etc. 9 Sports Centre A premise used for Outdoor and indoor games with pavilion buildings, stadium structure for spectators and related facilities. B. Permissible Activities Table 22. 35 Use Premise and Activities Permitted - Regional Park, City Park, District Park, Community Park & Multipurpose Grounds S. Use Zone P1 P2 RD No Use 1 2 3 4 5 6 7 8 9 Premise Regi City Distr Com Theme City Distri Co Local onal Par ict muni Based ct mm Level[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 680 Park k ty / unit Park Park * Park y s Amuse ment Multipurpose Activities Parks Ground Permitted 1 Forests/ Woodlands 2 Watch and Ward room 3 Picnic Huts & grounds 4 Bio- diversity Park 5 Zoological Garden/Bir d Sanctuary 6 Botanical Garden/ Arboretum 7 Local Governmen t Offices (Maintenan ce) 8 Open Air Theatre/ Amphitheat re 9 Shooting Range 10 Police Post/ Fire Post 11 Orchard 12 Plant Nursery 13 National Memorial (approved by Cabinet/ Govt. of India) 14 Aqua park/water sports park/ Aquarium 15 Sports activities 16 Playground 17 Recreationa l Club 18 Open-air food court 19 Children Park / Children[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 681 Traffic Park 20 Specialized Park 21 Archaeologi cal Park 22 Amusement Park/ Theme Park Rides Mechanical +water ride s), games, shows,The me Exhibits etc. 23 Amenity structures 24 Open gyms 25 restaurant/ Café 26 Vending booth/ Kiosks/ 27 Public meeting ground, Public address podium, Provision for public gathering/ marriage/ Utsav Pandal & other public & social functions etc. 28 Play area 29 Public fairground/ Mela Note: *Approved Farm Houses sanctioned prior to 01.08.90 [or subsequently if approved by [concerned municipal body], as per the policy applicable for regularization of the existing farm houses subject to necessary clearances from the Central Empowered Committee of Supreme Court and the Ridge Management Board of GNCTD are allowed.] Table 22. 36 Use Premise and Activities Permitted - Archaeological Park, Biodiversity Park & Green buffer S. Use Zone P3 P4[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 682 No Use Premise 10 11 12 13 Archaeological Historical Biodiversity Green Activities Parks Monuments Park Buffer Permitted 1 Public festivals/exhibitions (Temporary Structures) 2 Cycling & walking tracks 3 Interpretation/ Visitor centres 4 Restaurants / Food courts 5 Orchards/ Arboretums, greenhouses, gardening clubs, community vegetable gardens & plant nurseries, etc. 6 Specialized Parks (Butterfly Parks, Fernarium etc.)/ Facilities for Flora & Fauna 7 Open Air-Theatre 8 Amenity Structures* 9 Scientific Laboratories 10 Administrative Office 11 Camping Site 12 Wetlands & marshes for water-based ecologies 13 Active public use; parks, yoga spaces, active sports (without formal seating) & boating 14 Kiosks Note: * Amenity structure includes toilet blocks, pump room, electric room, guard room, store room and equipment room. These shall be permissible in all parks except at local level. Table 22. 37 Use Premise and Activities Permitted - Sports Facilities S. Use Zone P5 (Sports Facilities) RD No Use Premise 14 15 16 17 City Level District Community Local Activities sports: Sports sports Level Permitted Divisional Centre Centre Play Sports Area Centre 1 Multiuse Stadium (Seating capacity 15,000) 2 Stadium[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 683 3 Aquatic centre (covered or otherwise with full size competition pool, a training / lap pool, diving pool which can also be used for Water Polo and Synchronized swimming as well as other aquatic recreational facilities like waterslides, wave pool, hydrotherapy pool, Akhara etc.) 4 Multipurpose hall (Seating capacity 4,000) [for Exhibitions, Trade Shows, Banquets, Multiple sports & related and socio-cultural events 5 Sports facilities (outdoor and indoor) 6 Sports academy/ Sports Training Centre 7 Sports Medicine Centre 8 Swimming pool 9 support infrastructure; storage space /spaces for facilities like changing rooms, multi-gym, etc. 10 Shop* 11 Restaurant/ cafeteria* 12 Bank extension (counter)* 13 Office (departmental)* 14 Hostel / Residential Accommodation for sports persons/ players, Plotted Housing (maintenance & management staff): Min. 5% of total FAR 15 Police Post, Fire Post, Digital Infrastructure Kiosks 16 Children’s corner 17 Playground 18 Watch & Ward Residence. Note: *S. no 10 to 13 Activities all together are permitted for Max 5% of total FAR. C. Development Control Norms Table 22. 38 Recreational Min. Plot Max. Min Use No.(s) Area (sqm)/ Ground FAR Height(m)[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 684 S. Premise unit Coverage ROW (%) (m) No LOCAL LEVEL Population upto 10000 Tot lot 1 40 125 -- -- -- -- Housing area 2 2 5000 -- -- -- -- park 3 Housing 2 5000 -- NR* Area (0.5 ha) Playground Local level 4 1 10,000 -- -- -- -- Park (1 ha) 5000- 5 Local level 1 10,000 2 % 4 -- NR* Play area (0.5 to 1 ha) * Subject to clearance from AAI, Fire Department and other statutory bodies. Min. Plot Max. Min S. Use Premise No.(s) Area (sqm)/ Ground FAR Height (m) ROW No. unit Coverage (m) (%) COMMUNITY LEVEL Population upto 100,000 Maximum permissible Community 35000sq.m height for all 1 Park 1 (3.5 ha) -- --- 18 types of habitable built structures is 4.8 m Other Controls: i. All permissible permanent built structures in the park shall not exceed 0.5% of the park area or 100 sq.m. whichever is lesser. ii. 20% of the area shall be developed as dense plantation. Maximum permissible Community height for all 2 Multipurpose 1 20,000sq.m (2 NA* NA** 18 types of ground ha) habitable built structures is 4.8 m Other Controls: i. * Minimum 50% of total area shall be under soft parking and remaining 50% shall be utilized for activities. ii. **All permanent built structures within the multipurpose grounds, shall not exceed 1% of the plot area or 500 sq.m. Whichever is less. Community 3 sports Centre 1 1 ha to 3 ha 20% 40 24 NR* Other Controls: Maximum 5% of FAR is permitted for the following: i. Shop,[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 685 Min. Plot Max. Min S. Use Premise No.(s) Area (sqm)/ Ground FAR Height (m) ROW No. unit Coverage (m) (%) COMMUNITY LEVEL Population upto 100,000 ii. Restaurant, iii. Bankextension (counter), iv. Office (departmental), v. Police Post, Fire Post, vi. Digital Infrastructure Kiosks. * Subject to clearance from AAI, Fire Department and other statutory bodies. Min. Plot Max. Min. S. Use No.(s) Area (sqm)/ Ground FAR Height (m) RoW No. Premise unit Coverage (m) (%) SUB-CITY LEVEL Population 5,00,000 Maximum permissible District 2,50,000 height for all types of 1 Park 1 sq.m (25 -- NA** 30 habitable built ha) structures is 4.8 m Other Controls: i. Following norms shall be applicable for built structures within District park that have an area more than 25 ha. a. Area of the restaurant plot shall not be more than 0.8 Ha or 1% of the District Park, whichever is less. b. Restaurant plot shall have no physical segregation from the rest of the District Park area. c. The building shall be a single storey structure with max. FAR of 5 and height not more than 4m. without any residential facility and to harmonize with the surroundings. d. In case there is no parking lot in the vicinity, parking should be provided at a reasonable distance from the restaurants. Parking area should not form part of the restaurant complex / greens. e. 30% of the area shall be developed as dense plantation. ii. Maximum permissible District 40000sq. height for all types of Multipurp ose 2 1 NA* NA** 24 habitable built Ground m structures is (4 ha) 4.8 m Other Controls: i. **All permanent built structures within the multipurpose grounds, shall not Min. Plot Max. Min. S. Use No.(s) Area (sqm)/ Ground FAR Height (m) RoW No. Premise unit Coverage (m) (%)[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 686 SUB-CITY LEVEL Population 5,00,000 exceed 1% of the plot area or 500 sq.m. whichever is lesser. ii. * Minimum 50% of total area shall be under Soft Parking and remaining 50% shall be utilized for activities. District 3 ha to 10 ha 3 Sports 1 20% 40 24 NR* Centre Other Controls: Maximum 20% of FAR a. Max. 5% for- i. Shop, ii. Restaurant, iii. Bank extension (counter), iv. Office (departmental). b. Min. 5% for- i. Hostel/ Residential Accommodation (for sports persons/ players), ii. Plotted Housing (maintenance and management staff), iii. Police Post/Fire Post, iv. Digital Infrastructure Kiosks. * Subject to clearance from AAI, Fire Department and other statutory bodies. Min. Min. Max. S. Use No.(s) Plot FAR Ro W Height (m) Ground No. Premise Area / (m) Coverage unit CITY LEVEL Population Above 20,00,000 Maximum permissible height Regional for all types of 1 Park --- NA NA* --- NA habitable built structures is 4.8 m Other Controls: i. The built structure shall include, provision of security cabins at the entrances to such sites, and 2 (two) toilets per sq.km. in the areas identified as recreational zones/ accessible zones with approval by concerned agencies. ii. Paved surfaces shall be restricted to a maximum of 0.1% of the area of a site. Wherever possible, only pervious material shall be used for paving. Note: **Any development in forest land falling within the Regional Park shall be in accordance to the Min. Min. Max. S. Use No.(s) Plot FAR Ro W Height (m) Ground No. Premise Area / Coverage (m) unit CITY LEVEL[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 687 Population Above 20,00,000 Forest Department. Maximum 1 @10,00,000 permissible height City Park population NA* for all types of 2 40 ha - * 30 habitable built structures is 4.8 m Other Controls: i. Following norms shall be applicable for built structures within City park having an area of more than 80 ha:  As regards permissible activities, norms for district park shall be applicable  Parking area for such activities should not form part of the built complex / greens. ii. 30% of the plot area shall be developed as dense vegetation. Maximum City permissible height Multipur 1 @10,00,000 80,000 for all types of 3 pose population sq.m (8 NA* NA** 30 habitable built Ground ha) structures is 4.8 m Other Controls: i. ** All permanent built structures within the multipurpose grounds, shall not exceed 1% of the plot area or 500 sq.m. whichever is lesser. ii. * Minimum 50% of total area shall be under Soft Parking and remaining 50% shall be utilized for activities. Theme 4 Based/ --- Up to Upto 10% 60 30 12 10 ha Amusem ent Parks Maximum Archaeol permissible height is ogical NA 6m subject to 5 Parks --- 0.5%* --- 18 permission from competent authorities. Other Controls: i. *Maximum built area for permanent structures shall not be more than 0.5% of the Min. Min. Max. S. Use No.(s) Plot FAR Ro W Height (m) Ground Premise Area / (m) No. Coverage unit CITY LEVEL Population Above 20,00,000 area of the park or 10,000 sq.m., whichever is less. ii. This built area computation shall exclude any heritage assets identified for adaptive reuse. iii. The built area shall be as per applicable statutory provisions including the Acts and Rules governing heritage assets. iv. Design and height of structures shall not obstruct views of the heritage assets and shall be approved by the Competent Authority. v. Public art and installations shall not be considered a part of built area. vi. Cycle tracks, local walkways and desire lines of access through the park shall be maintained and kept open to public during fixed hours. 2 storeys Max. 12 Biodiversity 6 --- NA 0.5%* --- --- m for Parks sloping roof structures.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 688 Other Controls: i. *Maximum permissible area of built structures shall be 0.5% of park area or 10000 sq.m., whichever is less. ii. Building within the Bio-diversity parks should meet “green building” criteria (Griha 4 star rating). 7 Green --- NA 0.5%* --- NA 4.8m** Buffer Controls for built structures: i. *Maximum built area for permanent structures shall not be more than 0.5% of the area of the site. ii. ** Maximum height of the permanent structures shall be 4.8m., except as prescribed by AAI, HCC, DUAC, DTL. iii. Where any projects for buffer development include heritage assets, the built area shall be as per applicable statutory provisions including the Acts and Rules governing heritage assets. iv. Maximum ancillary permissible is 20% of total built up –museums and information centers, restaurants, cafes (applicable on minimum consolidated area of 1 ha). Other Controls: i. Cycle tracks, local walkways and desire lines of access through the site shall be maintained and kept open to public during fixed hours. ii. Wherever possible, new developments along the edge of such sites shall face the sites. Compound walls shall be transparent above a height of 1m. The green buffer should be kept maintained, free from all encumbrances and open to public. Min. Min. Max. S. Use No.(s) Plot FAR Ro W Height (m) Ground Premise Area / (m) No. Coverage unit CITY LEVEL Population Above 20,00,000 City Level 1,00,00 sports: 1 @10,00,000 8 Divisional population 0 sq.m 20% 40 30 NR* Sports (10 ha) Centre Other Controls: Maximum 20% of total FAR a. Max. 5% i. Shop, ii. Restaurant, iii. Bank extension (counter), iv. Office (departmental). a. Min. 5% for i. Hostel / Residential Accommodation (for sports persons/ players), ii. Plotted Housing (maintenance and management staff), iii. Police Post/Fire Post, iv. Digital Infrastructure Kiosks. *Subject to clearance from AAI, Fire Dept. and other statutory bodies. Other Controls for Recreational Areas: i. In all new projects located along drains or water bodies (above 1 ha) shall maintain a minimum mandatory buffer of 10m from the edge of the water bodies/drains wherever feasible. ii. All permanent and temporary construction shall be made inclusive for all and accommodate the needs of persons with disabilities.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 689 iii. All habitable built structures shall not exceed 4.8m unless otherwise specified such as in case of Biodiversity parks etc. iv. Recreational activities in Yamuna Flood Plain shall be permitted as identified as Yamuna Comprehensive Plan developed by DDA (ref: ENV:2). The norms for built structures developed in these zones shall be as follows: a. Maximum built area for all such structures shall not be more than 0.5% of the area of the plot or 10,000 sq.m. whichever is less. v. For Parks and Multipurpose grounds: a. Paved surfaces shall not exceed 1% of the total park area. b. Any park currently operating/serving as District park or City park, shall continue to fall in the same nomenclature. c. Minimum 50% of total area shall be under Soft Parking and remaining 50% shall be utilized for activities. d. Minimum 3% of the remaining area (excluding Soft Parking area) shall be utilized for Electric Sub Station, Toilets, Security and other marriage related activities etc. e. Multipurpose Ground can be sub-divided suitably with minimum of 0.5 ha of plot area to accommodate number of functions at one time. f. All park / multipurpose grounds (5 to 10%) shall have provisions for rainwater harvesting. g. Neighbourhood park, housing park, neighbourhood playground, housing playground and tot lots shall be a part of gross residential area. h. Maximum permissible height for all types of habitable built structures is 4.8 m (unless otherwise specified). Pneumatic structures and kinetic facades (as per international standards), temporary structures, iconic structures, sculptures and installations, architectural features, that are non-habitable shall be free of FAR and no height restrictions shall be applicable on these, with approval from Authority. For archaeological parks, necessary permissions shall be taken from approval authorities. i. Amenity structure includes toilet blocks, pump room, electric room, guard room, store room and equipment room. These shall be permissible in all parks except at local level. j. Parks that have been identified as flood sink areas shall not have any permanent construction. k. Multi-gyms shall be permissible in parks having an area of 1 ha and would have built-up area of min. 225 sq.m. and not more than 500 sq.m. l. Informal shops shall be permitted at the entry of these parks as follows:  City/ District park: 8-10 at major entries  Community parks: 2-5 at major entries  Multipurpose grounds: 2-5 at major entries m. Development of parks and green corridors along the Nallahs should incorporate conservation of ground water and water bodies. To recharge the ground water, conservation of water bodies and rainwater shall be essential. The area near Najafgarh Jheel and its surroundings and the Ridge can also be used as potential water conservation area. vi. Sports Facilities: a. New play fields shall be preferably provided / developed in the vicinity of educational institutions and landscape areas. b. To incentivize development of sports facilities and swimming pool (maximum 100 sq.m.) within the group housing areas, schools, clubs, etc. shall not be counted towards ground coverage and FAR.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 690 c. All these various sports facilities shall have layout plan, landscape plan, and parking plan, etc. d. The playground and sports facilities should be accessible by a network of pedestrian and cycle tracks wherever feasible. e. The sports facilities shall be developed according to proper layout plan and landscape plan with adequate parking facility. f. The existing sports infrastructure shall be upgraded and efficiently re-planned to provide better facilities. g. Multi-gyms would be permissible in parks having an area of one ha. and would have built up area upto 225 sq.m. 22.12 Transport A. Development Control Norms Table 22. 39 - Transport Development Controls^ S. Area under Area FAR for Operation under passenger/ staff RoW* No Use Premise Plot Area (%) Buildin g FAR* accommodati on * (m) . (minimum) (Maximum (%) (%) ) (Maximu (maximum) m) 1. Airport As per norms of Airport Authority of India (AAI) Rail Terminal/ Integrated 2. Passenger -NA- 70 30 100 15 -NA- Terminals 3. ISBT 10 Ha. 60 40 100 30 45 4. Bus Depot 0.4 Ha 50 50 100 25 24 Multi-level 5. parking for 2 Ha 100 50 100 25 24 public buses 0.1 Ha (Communit 50 50 100 25 18 6. Bus y level) Terminal 0.2 Ha (Sub-City 50 50 100 25 18 Level) Property As per 7. Development for Upto 3Ha 25 100 -NA- -NA- requireme nt Metro Stations Metro/ RRTS 8. -NA- 80% 20% 100 15% -NA- Yards Multi-level 9. 0.1 Ha -NA- 66.6% 100 -NA- 18 parking[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 691 30m X 36m 10. Fuel stations (Minimum) 33m 80 20 40 -NA- 30 X 45m (Maximum) ^ To be read along with ‘Other Controls’ mentioned below. * FAR is to be calculated and utilised only on the Building Plot. Area under Bus Shelter not to be included in FAR. ** All existing Use premise shall continue to function. Other Controls: i. Airport: a. Activities Permitted: All facilities related to Airport / Aviation Passengers as decided by AAI. ii. Rail Terminal/ Integrated Passenger Terminals/ Metropolitan Passenger Terminal: a. Activities Permitted: All facilities related to Railway operations, Passengers, Goods handling, watch & ward, Hotel, Night Shelter. b. Only identified Rail Terminal/ Integrated Passenger Terminal/ Multi- Modal Transport Hub to be developed as per TOD norms subject to traffic and transportation studies related to surrounding road network. iii. ISBT: a. Activities Permitted: All facilities related to Bus operations & Passengers, Bus Terminal, parking, watch & ward, Soft Drink & Snack Stall, Offices, Hotel, Night Shelter, Commercial, Social infrastructure, Residential, Service Apartments, hostels. b. FAR shall be available on a maximum area of 10 Ha. or area of the site whichever is less. ISBT including operational structures have maximum FAR of 70 and Hotel/ Passenger accommodation & facilities have maximum FAR of 30. c. Parking: In addition to the requirement of parking for ISBT/ buses, parking for Hotel/ passenger accommodation and facilities shall be at the rate of 2 ECS per 100 sq.m. of floor area. d. The development shall be undertaken in a composite manner. e. ISBT only if identified as TOD node to be developed as per TOD norms subject to traffic and transportation studies related to surrounding road network. iv. Bus Depot: a. Activities Permitted: All facilities related to Bus operations & Passengers, Bus Terminal, parking, watch & ward, Soft Drink & Snack Stall, Offices, Hotel, Commercial, Social infrastructure, Residential, Service Apartments, hostels. b. Area of Bus depots at sub-city level shall be as per the requirement. c. As far as possible, bus depots must function as Bus Terminals. d. Bus depot site identified as TOD node to be developed as per TOD norms subject to traffic and transportation studies related to surrounding road network. v. Multi-level parking for public buses: a. Multilevel bus parking is permitted in all Use Zones except Recreational Open Space and environmentally sensitive areas. b. The site must accommodate at least the required number of bus[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 692 parking space on site at the rate of minimum 1 bus per 70 sq.m. c. A FAR of 100 is permissible over 50% of plot area. Norms of podium- based building shall be applicable. d. Operational structures and circulation areas may cover 100% of the plot area and shall not be counted towards FAR. e. The maximum height shall be as per local constraints like flight paths, heritage zones etc. f. There will be no restriction on the number of levels of basement subject to structural safety. g. In case of integrated schemes, development controls including height shall be asper approved scheme or as per local restrictions if any. vi. Bus Terminal: a. Activities Permitted: All facilities related to Bus operations & Passengers, Soft Drink & Snack Stall. vii. Property Development for Metro Stations: a. Metro Stations along with property development (composite development) up to a maximum area of 3.0 Ha shall be permitted in all Use Zones, except in Recreational and Regional Park/ Ridge Use Zone, Lutyens’ Bungalow Zone and Heritage Zones subject to approval from Technical Committee of DDA. b. This enabling provision of property development would have the following broad development controls: 1. 25% ground coverage and 100 FAR, including area under Metro Station with no height restrictions and subject to approval of the statutory bodies such as ASI, Airport Authority, DUAC etc. 2. In addition to the requirement of parking for Metro Stations, parking for the commercial component will be @ 2 ECS per 100 sq.m. 3. The development shall be undertaken in a composite manner and DMRC shall obtain approval of all the concerned local bodies/ agencies. c. Metro site identified as TOD node to be developed as per TOD norms subject to traffic and transportation studies related to surrounding road network. d. The following structures shall be treated as operational structures: 1. All Metro Stations and tracks supporting at grade, elevated and underground including entry structures, ancillary buildings to house DG sets, chilling plants and electric substation, supply exhaust and tunnel ventilation shafts etc. 2. Depots and maintenance workshops. 3. Traction sub-stations. 4. Operational Control Centres. 5. Police Station. 6. Recruitment and Training Centres for operational and maintenance staff. 7. Housing for operational staff and Metro security personnel only. 8. Rehabilitation work to be undertaken for the construction of Metro Project. 9. Shops in Metro Stations to cater to the public amenities. 10.Structures above platform over the foot print of the Metro Stations.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 693 viii. Metro/ RRTS Yards: a. Activities Permitted: Idle parking of coaches, washing and cleaning facilities, maintenance related facilities, watch & ward and staff related facilities. ix. Multi-level parking: For plots for Multi-Level Car Parking (MLCP) already earmarked / designated by local odies, the existing development control norms will continue, as follows: a. Minimum Plot Size – 1000 sqm. b. Plot size FAR Upto 3000 sqm 100 Above 3000-10000 100 FAR up to 3000 sqm + additional sqm 60 FAR on balance land. Above 10000 sqm 100 FAR up to 3000 sqm + additional 60 FAR up to 10000 sqm + additional 50 FAR on balance land. Maximum FAR permissible (excluding parking area) c. Maximum Ground coverage - 66.6%. d. MLCP plots shall be located on roads with RoW of 12 m and above, subject to feasibility report from a competent agency and NOC from Traffic Police and other statutory bodies. e. Remunerative uses i.e. activities permitted in Local Shopping Centre, Public and Semi Public uses and Residential use except Banqueting and multiplexes f. Parking to be provided for remunerative use, shall be @ 3 ECS/100 sqm. and 3 times additional ECS for MLCP component. g. The height shall not be restricted, subject to clearance from AAI, Delhi Fire Service and other statutory bodies. h. A single agency shall be responsible for management of the MLCP and the On-street parking up to a distance of minimum 500 m along the road from the MLCP site. i. Suitable measures have to be taken by the Management Agency to discourage on- street parking around the MLCPs by means of increased parking charges (at least 3 times that of MLCP) and other measures. j. MLCP plots forming part of comprehensive schemes, shall be governed by the development control norms of the approved scheme. k. Metro deduction shall not be applicable. l. For all the MLCP sites beyond 3000 sqm Traffic Impact Assessment (TIA) and Traffic Management Plan (TMA) studies are mandatory. In case of MLCP plots which do not completely get covered by these norms shall be put up for approval of authority for appropriate decision. x. Fuel stations: a. CNG stations may be permitted in all use zones except in ‘Regional Park/ Ridge’, developed district parks and Zone ‘O’. Petrol pumps are permissible in all use zones except in Zone ‘O’ and recreational use zone.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 694 b. Fuel Stations are permissible on Master Plan / Zonal Plan roads and shall not be permitted in absence of an approved Zonal Plan of the area. c. The regulations for locating the fuel stations-cum-service stations, the development control and permissibility shall be governed by the policy / decision by competent Authority / Government Notifications issued from time to time. d. Fuel stations shall be regulated by the following controls: 1. Fuel stations shall be located on roads of minimum 24m ROW. 2. The plot size for fuel stations shall be minimum of 30m X 36m and maximum of 33m X 45m (75m X 40m for CNG mother station as per requirement). 3. The minimum distance of plot from the ROW line of road intersections shall be as follows:  For minor roads having less than 30m ROW - 50m  For roads of ROW 30m or more- 100m  Frontage of plots should not be less than 30m. e. Maximum Height: 6m f. Canopy: equivalent to ground coverage within set back. g. Maximum 10 FAR permissible for non-inflammable, non-hazardous commercial activities subject to payment of conversion charges/ levies as may be prescribed by the government from time to time. h. In case of existing petrol pumps the provision of maximum 10 FAR for commercial activity would be permissible only to those fuel stations / petrol pumps which conform to the controls given in d) i, ii, and iii above subject to payment of appropriate fees/ levies/ misuse, penalty and other charges. i. Dispensing capacity of CNG stations should be substantially increased to cater to the increasing demand from all types of CNG vehicles. j. At the time of preparation of layout plans of various use zones namely viz. residential, commercial, industrial, PSP facilities and other areas, the location of Fuel Stations should be provided as per the following norms: Table 22. 40 Fuel station norms S. No Land Use/Use Premises Norms 1. Residential Use Zone Two Fuel Stations (One Petrol Pump + One CNG station) per 150 ha. of gross residential area 2. Industrial Use Zone Two Fuel Stations (One Petrol Pump + One CNG station) per 40 ha. of gross industrial area 3. Freight Complexes Four Fuel Stations (Two Petrol Pumps + Two CNG stations) in each 4. District Centres Four Fuel Stations (Two Petrol Pumps + Two CNG stations) in each district centre 5. Community Centre Two Fuel Stations (One Petrol Pump + One CNG station) in each 6. Public & Semi-Public use zone Two Fuel Stations (One Petrol Pump + One CNG station) in each PSP area. 7. Security Forces Campus / Police / For captive use / as per requirement. Hospitals / Tertiary Health Care Centres / Govt. k. Electric charging stations shall be permitted as an integrated installation within fuel stations, wherever feasible. 22.12.1 Parking Standards[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 695 i. Parking standards have been prescribed in each use premise. However, wherever it is not prescribed, it will be followed as given as below: Table 22. 41 General Parking Standards S. Use Premises Permissible Equivalent Car Spaces (ECS) per 100 sq. m. No. of built up area* 1. Residential Refer table 22.45 2. Commercial Refer table 22.45 3. Industrial Refer table 22.45 4. Government Refer table 22.45 5. Public and semi- Refer table 22.45 public facilities Note: a. Additional parking may be created only as paid, shared parking facilities accessible to public at all times. b. In case of integrated schemes with multiple use premise, parking norms may be rationalized proportionately to each use unless otherwise specified (for e.g. in TOD Schemes). This shall be subject to approval of Technical Committee of DDA. ii. For the provision of parking spaces, the space standards shall be as given in the Table below. Table 22. 42 Space Standards for Car Parking S. No. Type of Parking Area per ECS (sq. m.) 1. Open 23 2. Ground floor covered 28 3. Basement 32 4. Multi-level with ramps 30 5. Automated multilevel with lifts 16 iii. In the use premises, parking on the above standards shall be provided within the plot. iv. In cases, where the building (except hotel) with sanctioned plan is existing/ under construction and where building plans stand sanctioned as per MPD-2021, the parking is to be provided for additional FAR availed, as per the parking standards prescribed in MPD- 2041. v. Parking is one of the activities permitted in all use zones except in regional park / ridge, Recreational Open Space and parks as per the approved Zonal Plan/ layout plan. vi. The standards given in Equivalent Car Space (ECS) shall include parking for all types of vehicles i.e. cars, scooters, cycles, light and heavy commercial vehicles, buses etc. Parking adequacy statement / study for large projects like Stadia, Shopping Malls, Multiplexes will be desirable. Mode-wise parking spaces are to be marked on drawings to be submitted for approval. Table 22. 43 Indicative On-site Parking (ECS) Requirements for projects* Mode ECS Area including Distribution by mode Distribution by mode Standard by circulation (sq. – per 1 ECS – per 1 ECS mode (TOD Scheme) m.) Cars/ Taxis 1.00 23.00 0.60 0.60 2 Wheelers 0.25 5.75 0.25 0.10 Cycles 0.10 2.30 0.05 0.10[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 696 Buses/ Shared 3.50 80.50 0.05 0.10 Vans Commercial 3.50 80.50 0.05 0.10 vehicles Total 1.00 ECS 1.00 ECS *The above figures are indicative and may be customized on case-to-case basis. However, minimum proportion of cycle parking is mandatory. vii. Based on the outcome of the study of Public Transport Accessibility Level (PTAL) value, parking norms shall be reduced by the following deductions: Table 22. 44 PTAL Deduction in Parking Norms PTAL % Deduction in Parking norms Access Index Range Level Residential Commercial Industrial PSPs* 0 0 - 2 0 0 0 0 1 2 -3 0 0 0 0 2 3 - 5.5 10 5 5 10 3 5.5 - 7 20 10 10 20 4 7 - 8.5 20 20 20 20 5 8.5 - 12 20 20 20 30 6 12 - 20 20 30 30 30 7 20 - 30 30 30 30 30 30 and 8 30 30 30 30 above viii. MLCP deduction: If any Multi-level Car Parking (MLCP) is located within 500 m radius of any property, the parking requirement within that property shall be reduced by 10 percent. MLCP deduction shall not be applicable on Residential Use/Premise. ix. ECS norms for all use premise shall be as per the table below. The PTAL and MLCP deduction shall be applicable on these parking norms provisions. Table 22. 45 Parking Norms Use Zones Parking Provisions* Deductions PTAL MLCP Residential Premises Group Housing  EWS/ Service Personnel Housing DU size: P NP less than 40 sqm- Parking @ 0.5 ECS per DU*  DU size: 40sqm to 100 sqm: Parking Use Zones Parking Provisions* Deductions PTAL MLCP @1.0 ECS per DU*  DU Size: 100 sqm to 200 sqm: Parking @2.0 ECS per DU*  DU Size: above 200 sqm: Parking @ 2.0 ECS per DU* and additional 1.0 ECS per 100 sqm or part thereof. * DU size: Plinth Area In case of Government Housing Projects, the parking norms shall be as per the applicable norms adopted in case[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 697 of GPRA Colonies. Studio Apartment  1.0 ECS/100m2 of Built-up area P NP  Basement, if constructed, and used only for parking, utilities and services shall not be counted towards FAR. Plotted housing  2 Equivalent Car Space (ECS) in plots of NP NP size 250-300 sq.m.  1 ECS for every 100 sq.m. built up area, in NP NP plots exceeding 300 sq.m., provided that, if the permissible coverage and FAR is not achieved with the above-mentioned parking norms in a plot, the parking norms of the preceding category shall be allowed. Hostel/ Dharamshala or its equivalent /  0.5 ECS/100m2 of Built-up area P NP Guest House / Lodging & Boarding House/  These norms shall not be applicable for Sarai Guest House under Mixed Use Regulations Low Density Residential Plot  For plots 0.4 to 2 Ha, minimum 50% of plot NP NP (LDRP) area be left for soft parking and landscaping.  For plots more than 2 Ha located on roads of minimum width18m, minimum 50% of the plot area be left for soft parking, maximum 25% of the plot area for landscaping and max. 25% plot area for functions/ building purposes. State Bhawan/ State Guest House 1.0 ECS/100m2 of Built-up area NP NP Affordable Public Rental Housing (APRH)/ 0.5 ECS/100 sqm built up area P NP Affordable Rental Housing Complex (ARHC) Slum Rehabilitation Scheme  Residential component at 0.5 ECS per 100 P NP sq.m. of built-up area which can be relaxed wherever required.  Parking for remunerative purposes shall be as applicable for the relevant land use. Use Zones Parking Provisions* Deductions PTAL MLCP Night Shelter  No mandatory parking is to be provided NP NP Foreign Mission -- NP NP Economy - Industry, Trade and Commerce Convenience Shopping Centre / Local 2.0 ECS / 100 sq.m. of built-up area P P Shopping Centre / Local Level Commercial areas Service Market 2.0 ECS / 100 sq.m. of built-up area P P Community Centre / Non- 3.0 ECS / 100 sq.m. of built-up area P P hierarchical Commercial Centre District Centre/ Sub-Central 3.0 ECS / 100 sq.m. of built-up area P P Business District / Sub- City Level Commercial areas Commercial Plot: Retail & 3.0 ECS / 100 sq.m. of built-up area P P Commerce Metropolitan City Centre i.e. Connaught Place & its Extension, Fire Brigade Lane and Janpath Lane[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 698 Any other Commercial Centre, 2.0 ECS / 100 sq.m. of built-up area P P including i. Commercial component within/along with Railway / MRTS Stations / ISBT ii. Asaf Ali Road (the area shown as commercial strip in Delhi Gate – Ajmeri Gate scheme) Integrated Freight Complex/ 3.0 ECS / 100 sq.m. of built-up area P P Wholesale Market Godown Plot Common parking to be provided in case of P P plots upto 300 sq.m 3 ECS / 100 sq.m. of floor area for plots above 300 sq.m. Hotel  2.0 ECS / 100 sq.m. of built-up area P NP  In respect of hotels where the building plans stand sanctioned prior to 27.1.2006, parking standard of 3 ECS for 100 sqm of built-up area shall be applicable only for the additional FAR which will be availed consequent upon amendment to MPD-2021. In respect of hotels where the building plans have been sanctioned on or after 27.1.2006, the parking standard of 3 ECS for 100 sqm of built-up area shall be applicable to the entire plot. Service Apartment 2.0 ECS / 100 sq.m. of built-up area P NP Motel  3.0 ECS / 100 sq.m. of built-up area P P  All guest parking must be catered to within the motel premises themselves. Manufacturing, Service and Repair 2.0 ECS / 100 sq.m. of built-up area P P Industry Use Zones Parking Provisions* Deductions PTAL MLCP District Court 2.0 ECS / 100 sq.m. of built-up area P P Integrated Office Complex, 1.0 ECS / 100 sq.m of built-up area. P P Government offices (Central / State Government / Local Bodies) Social Infrastructure Play School, Coaching 1.33 ECS / 100 sq.m of built-up area. P P Centre, Computer- Training Institute, Physical Education Centre etc. Nursery School 1.33 ECS / 100 sq m of built-up area. NP NP Primary School 1.33 ECS / 100 sq.m. of built-up area NP NP Senior Secondary Schools, , 2.0 ECS / 100 sq.m. of built-up area NP NP Integrated School Schools for mentally challenged, 1.0 ECS / 100 sq.m. of built-up area NP NP schools for differently abled (new) persons Research & Development Centres 1.0 ECS / 100 sq.m. of built-up area P P[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 699 Institutions, Forensic Science 1.33 ECS / 100 sq.m. of built-up area P P Laboratory Vocational Training Centre, 1.0 ECS / 100 sq.m. of built-up area P P ITI/Polytechnic/ skill centres, Management Institute, Coaching Centre, training Institutes, etc General Colleges, Professional 1.0 ECS / 100 sq.m. of built-up area P P Colleges, etc University Campus 1.0 ECS / 100 sq.m. of built-up area P P Dispensary, clinics, diagnostic facility, 2.0 ECS/ 100 sqm of built-up area. P NP Maternity home, Nursing home, Hospitals, Tertiary health centre, etc. Paramedic Institute 1.0 ECS/ 100 sqm of built-up area. P P Govt. Hospitals, Medical college 1.0 ECS/ 100 sqm of built-up area P P Dispensary for pet animals and birds 1.0 ECS/ 100 sqm of built-up area. NP NP Veterinary Hospital for pet animals and birds Veterinary Institute 1.0 ECS / 100 sq.m. of Admin. Built-up NP NP area Multi-facility Plot 1.0 ECS / 100 sq.m. of built-up area P NP Old Age Home/ Adult Education 1.8 ECS / 100 sq.m. of built-up area P P Centre/Orphanage/Children’s Centre Residential Care Centre for differently 1.8 ECS / 100 sq.m. of built-up area NP NP abled persons/Mentally challenged Large religious centre 2.0 ECS / 100 sq.m. of built-up area P P Banquet Hall 6.0 ECS / 100 sq.m. of built-up area NP NP Fitness centre 3.0 ECS / 100 sq.m. of built-up area NP NP Multipurpose Community Hall, 2.0 ECS / 100 sq.m. of built-up area P P Socio-cultural Institute, Cultural and Information Centre Recreation Club, Convention 2.0 ECS / 100 sq.m. of built-up area NP P Use Zones Parking Provisions* Deductions PTAL MLCP facilities, Museum, Public/ other Library Socio-cultural centre, Science  Subject to statutory clearances P P Centre, Planetarium, Exhibition-  2.0 ECS / 100 sq.m. of built-up area cum-Fair Ground, International Convention Centre, etc Police Outpost 1.33 ECS / 100 sq.m. of built-up area NP NP Police Post/station, Fire 2 ECS / 100 sq.m. of built-up area P Post/station, Police Line, District Police office, District Disaster Management, District Jail, Police / Fire Training Institute/college, Police Camp, Security Camps, Disaster Management centre, Security Establishment Head Post Office, Telecom facilities, 1.33 ECS / 100 sq.m. of built-up area P P Digital infrastructure facilities Media/ Radio services, satellite & 1.33 ECS / 100 sq.m. of built-up area P P Telecommunication centre,[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 700 Observatory & Weather Office, Media & news agency, Digital infrastructure facilities Green and Recreational Areas For Parks above 3.5 Ha- City Park, Parking may be provided in the lots of 25 NP NP District Park and Community Park to 40 ECS at different locations, as per requirement. City Multipurpose Ground, District Minimum 50% of total area shall be Multipurpose Ground and Community under soft parking Multipurpose Ground Amusement Parks/ Theme Based 3 ECS / 100 sqm. of built-up area with the NP NP stipulation to provide min. parking for 100 cars. Biodiversity Park Parking may be provided in the lots of 20 to NP NP 25 ECS at different locations, as per requirement. Sports facilities 2 ECS/100 sq.m. of built up P P Other Use Premises Property development in Transit 1.0 ECS / 100 sq.m. of built-up area of P P Stations commercial component Temporary Cinema 3.0 ECS / 100 sq.m. of built-up area P P Hotel/ passenger accommodation 2 ECS per 100 sq.m. of built up P P within ISBT Note- * In all use premises, parking based on the above standards and applicable deductions shall be provided within the plot. 22.13 Utilities 22.13.1 Water Supply and Sanitation Table 22. 46 Water Supply and Sanitation Area per S. No. Utilities No. Unit (Ha) Sewage Pumping Station As per Local Level Underground water tank with booster station and requirement 1 Population upto OHT 10,000 Local level waste water treatment facility Sub-City Level Sewage Pumping Station As per 2 Population Waste water treatment facility requirement 5,00,000 City Level Sewage Pumping Station As per 3 Population Sewerage Treatment Plant (180 mld) requirement 20,00,000 Table 22. 47 Area requirement for Water Supply and Sanitation Land S. No. Utility Capacity Requirement (sqm) STP (with SPS & EPS) - upto 5 MGD (22.7 MLD) 1 650 sq.m./MLD Sewage capacity Treatment STP (with SPS & EPS) - capacity above 5 MGD 1,100 2 Plant (STP)[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 701 (22.7 MLD) sq.m./MLD 3 Sewage Pumping Station (SPS) 50 sq.m. 4 Effluent Pumping Station (EPS) 50 sq.m. 5 Water WTP - 80 MGD (363 MLD) 300 sq.m./MLD Treatment WTP - 40 MGD (182 MLD) 6 Plant (WTP) 400 sq.m./MLD 7 Underground 5 ML Capacity 700 SQ/ML Reservoir with 50 ML Capacity 8 Booster Pumping 600 SQ/ML Stations 22.13.2 Solid Waste Management Table 22. 48 Area requirement for Solid Waste Management Area per S. No. Utilities (Capacity) No. Unit (sqm) Local Level Area for segregation of waste 1 1 200 Population upto and parking of utility vehicles 10,000 (previously: Dhalao) Sub-City Level Material recovery facility (semi- 6,000 - 2 Population 1 automatic): 200 TPD 8,000 5,00,000 City Level Material recovery facility (automated) 1@ > 10,000 - 3 Population : > 10,000 TPD 20,00,000 20,000 20,00,000 Remark: MRF (Material recovery facility) as per SBM guidelines 22.13.3 Power Table 22. 49 Area requirement for Power Area per Unit S. No. LEVEL Utility No. (sqm) Local Level 1 Electric Sub Station 11 KV 1 40 Population upto 10,000 Community Level 2 Population Electric Sub station 66 KV 2 2,500-4,000 1,00,000 Sub-City Level 3 Population Electric Sub station 220 KV 1 7,000-10,000 5,00,000 City Level 4 Population Electrical Sub station 400 KV 1 40,000 20,00,000 22.13.4 High Tension (HT) Line Buffer Table 22. 50 Buffer from High Tension (HT) Line[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 702 Minimum RoW S. No. Utility Voltage Ground Requirement Clearance 1 765kV 12.1m 67m HT Line buffer 2 400kV 8.8m 52m 3 220kV 7m 35m 22.14 Government A. Use Premise and Definitions Table 22. 51 Use Premise and Definition - Government S.No. Use Premise/ Category Definition President Estate and 1 President Estate and Parliament House Parliament House Premises used for the office of Central/ State/ Local 2 Government Offices Government departments/ agencies. Premises/ Office complex for offices of Central, State, Local 3 Integrated Office Government departments/ agencies and Complex PSUs. These premises may include offices of single/ multiple departments/ agencies. Premises/ Court Complexes used for the offices of District Court, Family Court, 4 Judiciary and related activities like lawyers chambers. etc. The norms of Govt. land (use undermined) shall be as per approved 5 Government Land (use layout / scheme, for which undetermined) development controls shall be as per respective use premises. B. Permissible Activities Table 22. 52 Use Premise and Activities permitted Use Zone G2 (Government) Use Premise 1 2 S.No. Government Offices / PSU’s, District Court, Family Court, Integrated Office Complex Activities permitted etc. 1 Court 2 Government Offices Residential max. 5% of FAR 3 4 Post Office 5 Canteen/ Cafeteria 6 Police Post 7 Fire Post 8 Restaurant 9 Retail Shop 10 Library 11 Dispensary 12 Administrative offices 13 Banks and ATM[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 703 14 Lawyer’s Chamber 15 offices Digital Infrastructure facility 16 Gym/ Yoga/ Meditation 17 Centre (non-Commercial) Creche / Child Care 18 Centre C. Development Control Norms Table 22. 53 Government Offices Plot Maximum Minimum Height (m) S.No. Use Premise Area Ground FAR ROW (m) (Min) Coverage District Court, No height 1 Family Court, restriction subject etc. to clearance from Government 1 Ha 50% 300 18 2 AAI, DFS and Offices other statutory Integrated 3 bodies Office Complex Note  For all new allotments only. Land already allotted not covered under this provision.  The maximum FAR for Use premises located in Zone O, and Bungalow Area of Zone C and Zone D, will be 200, along with other provisions given in Zonal Development Plans. Other Controls i. Residential Use– Maximum up to 5% of total permissible FAR can be utilized for residential activities. ii. Public Sector Undertaking/Commercial offices to be restricted to 10% of the total permissible FAR. iii. In case of Redevelopment: Utilization of 10% of total permissible FAR for Commercial Uses shall be permissible to make the redevelopment process financially feasible. This shall be subject to approval of land-owning agency and concerned local body. iv. The norms of Govt. land (use undermined) shall be as per approved layout/ scheme, for which development controls shall be as per respective use premises. 22.15 Public and Semi-Public – Social Infrastructure 22.15.1 Health Facilities A. Use Premise and Definitions Table 22. 54 Use Premises and Definition – Health Facilities S. No. Use Premise Definition 1 Non-bedded Health A premise with facilities for medical advice, provision of medicine, facility and/or for carrying out various tests for confirmation of symptoms[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 704 of a disease. Such facilities may have a few observation beds. (eg. Dispensary/ Clinics/ Clinical laboratory, etc.) 2 Non bedded Health A premise having facilities for medical advice and provision of facility (Veterinary) medicines. (eg. Dispensary for animals and birds, Pet clinics, etc.) 3 Bedded Health facility A premise having medical facilities for treatment/ care for both (Small) indoor and outdoor patients having upto 50 beds. Such premises may also include health-care facilities for persons with special needs, elderly, etc. and facilities for pathological/ radiological evaluation of a person’s health condition for confirmation of any ailment/ disease. (eg. Nursing Home/ Maternity Home/ Polyclinic/ PHC / Family Welfare Centre/ Paediatric Centre/ Geriatric Centre/ Transition- homes/ Respite care centres, Voluntary health services, Diagnostic centres, Deaddiction/ Rehabilitation facility, etc.) 4 Hospital A premise providing medical facilities of general or specialised/ advanced nature for treatment of indoor and outdoor patients. Such premises may also include R&D facilities related to health- care. (eg. Hospital/ Tertiary Health Care Centre) 5 De-addiction/ A premise with facilities for providing substance use disorder Rehabilitation Centre treatment (like drug, alcohol, etc.) and rehabilitation ranging from Acute Detoxification Centres to Long Term Treatment Centres. (eg. Standalone De-addiction Centre/ Rehabilitation Centre) 6 Veterinary Hospital A premise having medical facilities for indoor and outdoor treatment of animals and birds. (eg. Veterinary hospital) 7 Veterinary Institute A premise providing medical education and training for granting degrees, diplomas, licenses in veterinary science and animal husbandry 8 Medical College A premise having facilities in which a person may undergo a course of study or training including any post graduate course of study or training which will qualify him for the award of a recognized medical qualification. Note: Health facilities can be managed by public/ private/ voluntary organizations. B. Permissible Activities Table 22. 55 Use Premises and Activities Permitted – Health Facilities Sr no. Use Zone RD PS1 Use Premise d e d nd oe Nb - h t la e H y t ilic a f d e d nd oe Nb - h t la e H y t ilic a f ) y r a n ir e t e V ( d e d d e By ht ti ll aic ea Hf ) lla m S ( la t ip s o H n o it c id ed Da -& n o it a t ilib a h e R y t ilic a f y r a n ir e t e V la t ip s o H la c id e M e g e llo C y r a n ir e t e V e t u t it s n I Activities Permitted 1 2 3 4 5 6 7 8 1 Administrative office Facilities for indoor 2 treatment of patients[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 705 Facilities for outdoor 3 treatment of patients Facilities for indoor 4 treatment animals and birds Facilities for outdoor 5 treatment of animals and birds De-addiction/ 6 Rehabilitation/ Counselling Centre 7 R&D facilities 8 Laboratories 9 Diagnostic facilities 10 College / Institute Library/Reading 11 room Watch & Ward 12 Residence (Upto 20 sqm) Retail shop (chemist 13 shop upto 20 sq.m. only) Retail shop 14 (other than chemist) 15 Canteen/ Cafeteria 16 ATM 17 Vending booth/ kiosk Accommodation 18 for Staff Patient 19 attendant accommodation 20 Hostel 21 Indoor games hall Bank 22 extension counter 23 Prayer room Creche/day- 24 care facilities Traffic Police Control 25 Room / Police Outpost 26 Fire Post 27 Post office counter Use Zone RD PS1[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 706 Sr no. Use Premise d e d nd oe Nb - y ht ti ll aic ea Hf d e d nd oe Nb - y ht ti ll aic ea Hf ) y er ta en Vir ( d e d d e B y ht ti ll aic ea Hf ) lla m S ( la t ip s o H n o it c id ed Da -& n o it a t ilib a h e R y t ilic a f y r a n ir e t e V la t ip s o H la c id e M e g e llo C y r a n ir e t e V e t u t it s n I Activities Permitted 1 2 3 4 5 6 7 8 28 Auditorium C. Development Control Norms Table 22. 56 Health facilities Min. Plot Max. Min S. No. Area Height Ground RO No Use Premise (s) (sqm)/ unit FAR (m) Coverage W (%) (m) LOCAL LEVEL Population upto 10000 1 Non-bedded Health facility 1 800 30% 150 12 COMMUNITY LEVEL Population upto 100000 Non-bedded 1 Health facility 1 300 35% 100 18 (Veterinary) Health facility 2 6 1000* 30% 150 18 (Small) 250 for RoW less than 40%and 24m. 300 for 3 Hospital 3 2000- 5% RoW 18 15000 (MLCP) above24m. BRT 375 for RoW above 30m. SUB-CITY LEVEL Population upto 500000 250 for RoW 18m to 24m. 40% and 300 for RoW Above 1.5 1 Hospital** 3 5% above 24m. 18 ha (MLCP) 375 for RoW above Min. Plot Max. Min S. No. Area Height Ground RO No Use Premise (s) (sqm)/ unit FAR (m) Coverage W (%) (m) 30m. De-addiction/ 2 Rehabilitation 1 2000 35% 150 18 Centres Veterinary 3 1 2000 30% 150 18 hospitals[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 707 CITY LEVEL Population upto 20,00,000 As per Gross FAR: 1 Medical college MCI 160 Norms College and As per 35% hospital = min. 24 requir Veterinar y 75% Veterinary ement Council of Residential 2 Institute India / = min. 20% Ministry Others = upto norms 5% Notes: * In developed areas the plot size may vary depending on the availability of land. **Size of hospital plot will be restricted up to 1.5 ha in residential area, with preference to plot having three side open and having minimum 18m ROW on one side. Total floor area of the hospital shall be governed as per the total number of beds allowed in it. Other Controls for the above Use Premises: i. No height restriction subject to clearance from AAI, DFS, DMA, NMA and other statutory bodies. ii. For Maternity Home, Nursing Home/ Polyclinic, Primary Health Centre, Family Welfare Centre, Paediatric Centre/ Geriatric Centre, Diagnostic Centre, minimum gross area shall be 60 sq.m per bed and for use premises such as Hospitals, Tertiary Health Care Centre, De-addiction/ Rehabilitation Centres, R&D facilities, Veterinary hospitals for pet and animals, Medical colleges, Veterinary Institutes, minimum gross floor area shall be 80 sq.m per bed. iii. For Hospitals, Tertiary Health Care Centre, Veterinary hospitals, De-addiction/ Rehabilitation Centres and R&D facilities, maximum 10% ground coverage shall be allowed for providing atrium. In case, the permissible additional ground coverage for atrium is utilized 25% of the utilized ground coverage shall be counted toward FAR. iv. For Hospitals, Tertiary Health Care Centre, Veterinary hospitals, De-addiction/ Rehabilitation Centres and R&D facilities multilevel podium parking shall be v. permissible to the extent of building envelope lines, free from FAR and ground coverage to facilitate ample parking in spaces, subject to structural safety. vi. For Hospitals, Tertiary Health Care Centre, Veterinary hospitals, De-addiction/ Rehabilitation Centres and R&D facilities, maximum 10% of the achieved FAR shall be free if utilized for waiting and reception area. However, this area shall be taken into account for the provision of hospital parking as per norms. vii. For Hospitals, Tertiary Health Care Centre, Veterinary hospitals, de-addiction/ Rehabilitation Centres and R&D facilities, service floor of height 1.8m shall not be counted in FAR. viii. Environmental clearances are mandatory as per the prevailing regulations of Ministry of Environment, Forest and Climate Change. ix. Zero discharge for sewerage shall be enforced at the cost of the promoters and post treatment water can be used by premises for its needs of horticulture, flushing, coolant tower, washing or disposal to other construction sites. These issues concerned the local bodies and can be dealt accordingly as per existing regulations at the time of sanctioning the plan. x. Natural sky light condition is exempted for Atrium and construction over the Atrium may be allowed. xi. In case of existing premises / sites, the enhanced FAR shall be permitted, subject to payment of charges as may be prescribed by the Authority / land[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 708 owning agency and other clearances. xii. Basement after utilization for Parking; Services Requirements such as air conditioning plant and equipment, water storage, boiler, electric substation, HT & LT panel rooms, transformer compartment, control room, pump house, generator room; staff locker room, staff changing room, staff dining facilities without kitchen facility, Central sterile supply deptt., back end office; Other Mechanical Services; Installation of Electrical and firefighting equipments; and Other Services like kitchen, laundry and radiology lab and other essential services required for the maintenance/ functioning of the building, may be used for healthcare facilities with prior approval of the concerned agencies. xiii. Conditions for Ancillary Use: a. In case of Hospital (Upto 1.5 ha): i. Maximum 25% of FAR shall be allowed for residential component/ use such as accommodation of essential staff and attendants of the patients. ii. For support facilities other than residential component, a built-up area of max. 1% FAR upto 300 sq.m. shall be permitted. b. In case of Hospital (Above 1.5 ha) and Rehabilitation facility: i. Maximum 25% of FAR shall be allowed for residential component/ use such as accommodation of essential staff and attendants of the patients. ii. For support facilities other than residential component, a built-up area of max. 1% FAR upto 500 sq.m. shall be permitted. c. In case of Veterinary Hospital: i. Maximum 10% of FAR shall be allowed for residential component/ use such as accommodation of essential staff and attendants. ii. For support facilities other than residential component, a built-up area of max. 1% FAR upto 300 sq.m. shall be permitted. d. In case of Medical colleges & Veterinary Institutes) maximum 30% of FAR shall be allowed for permitted support activities: i. Minimum 20% of FAR to be allowed for residential component/ use such as accommodation of essential staff and attendants of the patients, hostel for students. ii. Maximum 5% of FAR shall be allowed for other support/ ancillary facilities other than residential 22.15.2 Educational Facilities A. Use Premise and Definitions Table 22. 57 Use Premise and Definition - Educational Facilities S. No Use Premise Definition[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 709 1 Learning Premises used for providing support/ parallel education facilities. Centres/ (eg. Playschool, Creche, Early learning centres, Coaching/ tuition facilities, Creches Anganwadi) 2 School (Type-I) A premise having educational and playing facilities for students’ upto V/ VIII standard. (eg. Primary School, Middle School) 3 A premise having educational and playing facilities for students’ upto XII School (Type- standard. II) (eg. Senior Secondary School, Secondary School, Integrated School) 4 A premise having educational (formal and vocational) and playing facilities Special Schools for mentally challenged & differently abled persons (eg. School for Mentally challenged, Schools for differently abled persons) 5 Research and A premise providing facilities for research and development for any specific Development field. Centre (eg. Research and Development Centre) 6 Institute Premises with facilities for vocational training and education (technical/ vocational/ management/ preparatory for employment) (eg. Vocational Training Centre/ ITI/ Polytechnic/ Vocational/ Training Institute/ Management Institute/ Teacher Training Institute, Commercial/ Secretarial Training Centre, Hotel Management, Nursing and Paramedic Institute, etc.) 7 College A premise having educational and playing facilities for students of under- graduate & post-graduate courses under a university. It includes all professional disciplines. (eg. General College, Professional College) 8 University A premise having an educational institution designed for instruction, examination, or both, of students in many branches of advanced learning, conferring degrees in various faculties, and often embodying colleges and similar institutions. B. Permissible Activities Table 22. 58 Use Premise and Activities permitted - Educational facilities Use Zone RD PS1 Use Premise n in r a e Lg / s r e t n e c s e h c e r C o o h c Se p y T l -I o o h c Se p y T- l I I a i c e p S l o o h c S l h c r a e s e R d n a m p o l e v e De Ce r t t nn e e t u t it s n I e g e l l o C y t i s r e v i n U Activities 1 2 3 4 5 6 7 8 Permitted 1 Creche and Day Care Centre 2 Nursery School 3 Kiosks 4 Canteen/ Cafeteria 5 Watch & Ward Residence upto 20sq.m 6 Retail Shops upto 20sq.m 7 Bank extension counter[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 710 8 ATM 9 Auditorium 10 Indoor games hall 11 Swimming Pool 12 Post Office Counter Facility 13 Hostel facility 14 Residential use of essential staff and student 15 Rehabilitation Centre 16 Workshop 17 College 18 Playground 19 Library C. Development Control Norms Table 22. 59 : Education Facilities S. Use Premise No Minim Maxim FAR Minimum Height No. um Plot um ROW (m) (m) Area Ground (sq.m.) Covera ge LOCAL LEVEL Population upto 10000 1 Learning Centre/ Creche 1 500 35% 120 12 1 School (Type-I) 1 2000- 30% 120 18 18 4000 2 School (Type-II) 1 4000- 35% 150 18 18 8000 Other Controls: a. In case of new schools, the front boundary wall shall be recessed by 6m to accommodate visitors parking within setback area. b. Upto 10% variation in plot size is permitted. Differential norms will be applicable to Special Area, Regularized Unauthorized Colonies, Urban Villages and Resettlement Colonies. c. Playground shall be developed on pool basis in different areas at local level. Note: Pre-Primary Schools / Nursery Schools / Montessary Schools / Creche, Play Schools, are permissible in residential use Use Premise No Minimum Maximu FAR Minimu Height Plot Area m m ROW (m) (sq.m.) Ground (m) Coverage SUB-CITY LEVEL Population upto 5,00,000 1 Special Schools 4[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 711 2000 50% 120 18 18 2 Research & Development 1 4000 35% 225 24 37 Centres 3 Institute 1 4000 35% 225 24 37 4 College* 2 As per 35% 225 24 37 UGC / AICTE Norms Other Controls: a. Variation in plot size upto 10% is permissible. b. In case of Special Schools, max. 20% of permissible FAR can be utilised for residential use of the essential staff and student accommodation. c. In case of R&D Centres, Institutes and Colleges, max. 30% of permissible FAR can be used for hostel accommodation for the students and staff. d. In case of old Colleges (above 4 ha area) plot shall be divided as follows: a. College Building area 1.8 ha 45% b. Play field area 1.8 ha 45% Use Premise No Minimum Maximu FAR Minimu Height Plot Area m m ROW (m) (sq.m.) Ground (m) Coverage SUB-CITY LEVEL Population upto 5,00,000 c. Residential including hostel area 0.4 ha 10% Development control norms for academic college building & residential will be same as that of University. Use Premise No Minim Maxim FAR Minimum Height um Plot um ROW (m) (m) Area Ground (sq.m.) Covera ge CITY LEVEL Population upto20,00,000 1 University Campus As including International per As per Education Centre (IEC) – req UGC/ Large campus (10 ha and uire AICTE 24 37 above) will be divided into men Norms following four parts: ts a) Academic including Administration (45% of 30% 225 37 total land area) b) Residential (25% of 1. Regulations for group total land area) housing shall apply 2. The land shall be reserved for facilities as per residential norms c) Sports and Cultural activities (15%) 10% 15 26 d) Parks and Landscape NA (15%)[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 712 22.15.3 Post and Telecommunication Facilities A. Use Premise and Definitions Table 22. 60 Use Premise and Definition - Post & telecommunication facilities S. No. Use Premise Definition 1 P&T facility (Type-I) Premise with facilities/ counters for postal, courier services, digital infrastructure and telecom facilities (eg. Post office counter, Courier service office, Digital infra facility/ kiosks, etc.) 2 P&T facility (Type-II) A premise with facility for postal and telecommunication services, to General Post Office and from a number of post offices attached to it. (eg. General post office, Head post office, Sub-city level digital infra facility, etc.) 3 P&T facility (Type-III)* Premise with facilities for recording, broadcast and transmission of Radio & Television news and other programmes, research & development of satellite Station & telecommunication technology, research and development of data relating to weather and forecasting thereof, facilities for digital resources and data management, etc.. (eg. Satellite and Tele- Communication Centre, Observatory & Weather Office, Media & News Agency including Media Training Centre, Digital infrastructure facility, etc.) 4 Transmission Tower A premise used for installation of a tower for and wireless station communication purposes. * Transmission Site/ Centre shall be considered as part of P&T facility (Type-III), however the development of such sites shall be as per requirement. B. Permissible Activities Table 22. 61 Use Premise and Activities Permitted - Post & Telecommunication facilities Use Zone PS1 Sl.no. Use Premise P & T Facility (Type II) P & T Facility (Type III) Activities Permitted 1 2 1. Retail shop Canteen/cafeteria/ 2. Vending booth/kiosk 3. Auditorium Accommodation/ 4. Residential for staff Watch & Ward Residence 5. (upto 20sqm.) 6. Library/ Reading room Fitness centre (non 7. commercial use Use Zone PS1[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 713 Sl.no. Use Premise P & T Facility (Type II) P & T Facility (Type III) Activities Permitted 1 2 Hostel accommodation 8. for students/ trainees 9. Press club 10. Dining area Facilities for Media (print, 11. television & internet 12. Research laboratory 13 Data Center C. Development Control Norms Table 22. 62 Post and Tele-communication facilities Use Premise No. Minimu Maximum FAR Mini Height m Plot Ground mum (m) Area Coverage ROW (m) LOCAL LEVEL Population upto 10000 1 NA No specific site reservation to be kept in P&T facility (Type-I) the layout plan since it is permitted in all use zones / under mixed use as per requirement, except in Recreational use zone CITY LEVEL Population upto 2000000 P&T facility (Type-II) 2 2500 30% 120 18 26 2 sq.m. 3 As per As per 35% 150 18 26 requir requirem ement ent P&T facility (Type-III) Note: Upto 10% variation in plot size is permitted. Other Controls: i. For P&T facility (Type-II), upto 15% of FAR is allowed for residential component and other support facilities. ii. For P&T facility (Type-III), upto 30% of FAR is allowed for hostel accommodation for students and residential use of essential staff. 22.15.4 Security-Police Facilities A. Use Premise and Definitions Table 22. 63 Use Premises and Definition – Security-Police Facilities S.No. Use Premise Definition[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 714 A premise of temporary structures having facilities for the 1 Traffic Control Room managing of traffic and related issues. A Premise with temporary structures for people and 2 Police Outpost equipment to manage law and order. A premise having facility for a local police post of a 3 Police Post temporary nature or on smaller scale as compared to a police station. A premise having facilities for offices of local police 4 Police Station post. District Police office and A premise having facilities for the offices and 5 Battalion paramilitary forces. An area having facilities for work and residential 6 Police Line accommodation of paramilitary forces. A premise with facilities for detention, confinement 7 Jail and reform of criminals under the law Police Training Institute/ A premise having facilities for training of paramilitary 8 College forces. Police Firing Range A premise having facilities for firing practice of the 9 paramilitary forces. Civil defense and home A premise having facilities for offices and other functions of 10 guards etc. civil organization for internal defense. Forensic science A premise having facility for application of medical 11 laboratory knowledge. A premise having establishments undertaking issues of National National Security 12 Security or as defined/ notified by Government of Establishments India from time to time. B. Permissible Activities Table 22. 64 Use Premises and Activities Permitted - Security-Police Facilities # S. Use Zone RD PS1 No Use 1 2 3 4 5 6 Premise Traffic Police Police Police District Police Line Control Outpos t Post Station Police Room Office and Activities Battalion Permitted 1. Accommodatio # S. Use Zone RD PS1 No Use 1 2 3 4 5 6 Premise Traffic Police Police Police District Police Line Control Outpos t Post Station Police Room Office and Activities Battalion Permitted n for staff 2. Canteen[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 715 3. Bank Extension Counter 4. Hostel 5. Playground 6. Indoor games facility 7. Officers Room with facilities for recording NCR (Non- Cognizable Report) and storing emergency equipments 8. Dormitory with toilet & bath facilities and kitchen 9. Communicatio n Centre 10. Service Workshop 11. Religious facility 12. Vending booth/ Kiosk 13. Reading room/ library 14. Fitness Centre for non- commercial use # S. Use Zone PS 1 No. Use 7 8 9 10 11 12 Premise District Police Police Civil Forensic National Security Jail Trainin g Firing defense & Science Establishment s Institut e/ Range home Laborator y College guards etc. Activities Permitted 1. Canteen 2. Bank Extension Counter 3. Hostel 4. Playground/ games facility 5. Accommodati on for staff 6. Retail shop of area 20 sq. m.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 716 each 7. Auditorium 8. Swimming Pool 9. Post office counter facility 10. First aid facility 11. Emergency Backup/ Disaster Preparedness 12. Watch and ward residence (upto 20 sq. m.) 13. Communicati on Centre (Temporary) 14. Reading room/ library 15. Fitness Centre for non- commercial # S. Use Zone PS 1 No. Use 7 8 9 10 11 12 Premise District Police Police Civil Forensic National Security Jail Trainin g Firing defense & Science Establishment s Institut e/ Range home Laborator y College guards etc. Activities Permitted use 16. Kiosks 17. Voluntary Health Services # S. Use Zone PS 1 No Use 13 14 15 Premise Activities Central Police Security Forces Police Camp Permitted Organisation camp 1. Bank Extension Counter 2. Hostel 3. Retail shop of area 20 sq. m.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 717 4. Swimming Pool 5. Communication Centre 6. Facilities for meditation/ spiritual training 7. Fitness Centre for non- commercial use 8. Accommodation for staff 9. Hostel 10. Hospital/ nursing/ paramedic facility 11. Veterinary hospitals for pet and animals 12. De-addiction/ Rehabilitation Center 13. Canteen C. Development Control Norms Table 22. 65 Security-Police Facilities Min. Plot Max. Min S. Use Area (sqm)/ Ground No.(s) FAR ROW Height(m) No. Premise unit Coverag (m) e (%) LOCAL LEVEL Population upto 10000 As per 1. As per requirement on Traffic and requirement, major road junctions/ Police Permissible in 1 stretches etc. as part of road right of --- control all use way based on site feasibility. room premises/ 2. Maximum area = 25 sq m. zone, and to be provided in Police 2 schemes as Upto 150 75% 300 18 m Outpost per requirement. COMMUNITY LEVEL Population upto 100,000 1 Police Post 1 Upto 2500 50% 300 18 m SUB-CITY LEVEL Population upto 500,000 Police 1 2 Upto 1 Ha. 50 300 18 m Station CITY LEVEL Population upto 20,00,000 1 per 50.0 1 District Jail Upto 2 Ha. 50 300 18 m lakh 2 Police Lines[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 718 District As per Upto 1 Ha. Police requirement 50 300 18 m 3 Office and Battalion Police Training 4 Institute/ As per College requirement Upto 5 Ha. 50 300 18 m Police 5 Firing Range Police 6 camp Other controls i. Max. FAR for Use Premises located in Zone O, and Bungalow Area of Zone C & Zone D, will be 120, along with other provisions given in Zonal Development Plans. ii. In case of Security-Police facilities, for all the use premises, maximum of 30%of permissible FAR can be allowed for residential and permitted activities as mentioned in table above. The residential component shall be as per Residential Plot-Group Housing. iii. Use premises such as National Security Establishments shall be permitted within the categories mentioned in above Table. iv. For the above plots, no height restriction shall be applicable, subject to clearance from AAI, Delhi Fire Service, and other Statutory bodies. 22.15.5 Safety-Fire Facilities A. Use Premise and Definitions Table 22. 66 Use Premises and Definition – Safety-Fire Facilities S. No. Use Premise Definition 1 Fire post Premises with lesser degree of facilities for fire fighting. The post may be attached to specific premises with fire prone activities. 2 Fire station A premise having facility for fire fighting for a catchment area assigned to it. It includes residence of essential staff. 3 Fire Training Institute A premise having facilities of training for emergency times in case of fire, building collapse etc. 4 Disaster Management Centre A premise having facility of disaster emergency backup, hospital facility, training centre for disaster preparedness, wireless communication etc. 5 Disaster Management Units A premise having establishments undertaking issues of Disaster Management or as defined/ notified by GOI from time to time. B. Permissible Activities[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 719 Table 22. 67 Use Premises and Activities Permitted - Safety-Fire Facilities S. Use Zone PS1 No Use Premise 1 2 3 4 5 Fire Fire Fire Disaster Disaster post Station Training Management Managem Activities Institute Centre ent Units Permitted Accommodation for 1. staff 2. Service Workshop 3. Hostel 4. Fire station 5. Watch and ward residence (upto 20 sq. m.) 6. Healthcare facility 7. Open practice grounds for practice and relief camps/ Disaster Preparedness 8. Communication Centre Temporar y 9. First aid facility 10. Emergency Backup 11. Canteen 12. Bank extension Counter 13. Night shelter 14. 15. Vending booth/ Kiosk 16. Reading room/ library 17. Indoor games facility 18. Fitness Centers for non-commercial use[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 720 C. Development Control Norms Table 22. 68 Safety-Fire Facilities Min. Plot Area Max. S. Use No.(s) (sqm)/ unit Ground FAR Min ROW Height(m) No Premise Coverag (m) . e (%) COMMUNITY LEVEL Population upto 100,000 1 Fire Post 1 Upto2500 50% 300 18 m sq. m. SUB-CITY LEVEL Population upto 500,000 Upto 1 1 Fire Station 2 Ha. 50 300 18 m Disaster 2 1 5000- 50 300 18 m Managemen t 10000 Unit CITY LEVEL Population upto 20,00,000 As per Fire Requireme nt Upto 50 300 18 m 1 Training 5Ha. Institute Disaster As per 2 Upto 5Ha 50 300 18 m Managemen t Requireme nt Centre Other controls i. Delhi Fire Services (DFS) shall identify fire hazard zones and the location of the fire services (fire stations/ fire posts) shall be identified such that it is tactically advantageous in providing fire protection services to the community. ii. Max. FAR for Use Premises located in Zone O, and Bungalow Area of Zone C & Zone D, will be 120, along with other provisions given in Zonal Development Plans. iii. In case of Safety-Fire facilities, for all the use premises, maximum of 30%of permissible FAR can be allowed for residential and permitted activities as mentioned in table above. The residential component shall be as per Residential Plot-Group Housing. iv. For the above plots, no height restriction shall be applicable, subject to clearance from AAI, Delhi Fire Service, and other Statutory bodies. 22.15.6 Distributive Facilities A. Use Premise and Definitions Table 22. 69 Use Premise and Definition - Distributive Facilities[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 721 S. Use Premise Definition No. 1 Milk Booth/Milk, Fruit & Vegetable A premise with basic facility for the supply of daily Booth/Delhi Milk Supply Booth/ Fair groceries to the local population. Price Shop 2 LPG godown including booking A premise for the booking, storing and supply of LPG office to local population. 3 Gas godown A premise having the facility of wholesale storage of LPG, godown, etc. B. Permissible Activities Table 22. 70 Use Premise and Activities Permitted - Distributive Facilities Use Zone PS 1 RD S. No. Use 1 2 3 Premise Gas Godown LPG Godown Milk Booth/Milk, Fruit & including Vegetable Booth/Delhi booking Milk Supply Booth Activities office Permitted 1. Booth/ built structure fordisplay and sale of dairy products/ fruits and vegetables etc. 2. Watch and ward residence (up to 20 sq.m.) 3. Booking office 4. Store / Godown 5. Care taker office Note: 1. Booking Office cum Godown: Permitted in all Use Zones except residential and recreational Use Zones. 2. LPG Booking Office can be permitted in all Use Zones. C. Development Control Norms Table 22. 71 Distributive Facilities S. Use Premise No Minimum Maximum FAR Minimum Height No. Plot Area Ground ROW (M) (M) (sq.m.) Coverage 1 Milk Booth/ Milk, One per 5000 i. As per standard design of the concerned Fruit & Vegetable population. department Booth/Delhi Milk Supply Booth/ Fair ii. Permitted in all zones as per approved layout Price Shop plan. 2 LPG godown i. Plot size – upto 600 sqm including booking office including booking As per and security hut. office requirements[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 722 ii. Permitted in all use zones except in residential and recreational use zones subject to statutory clearances. Other Controls: 1. Milk, Fruit, vegetable and LPG are the basic requirements of the day-to-day life, and should have proper distribution set-up. 2. Fair Price Shops may be provided in close proximity to EWS / LIG housing / resettlement colonies. 3. For LPG godowns the norms and standards shall be as per PESO (Petroleum and Explosives Safety Organization) 22.15.7 Socio-Cultural Facilities A. Use Premise and Definitions Table 22. 72 Use Premises and Definition – Socio-Cultural Facilities S. No. Use Premise Definition 1 Socio-Cultural facility Premises with facilities for local level socio-cultural activities; (Type-I) learning (music, art, etc.), playing, interaction, meeting and gathering spaces. (eg. Banquet Hall, etc.) 2 Socio-Cultural facility Premises with facilities for various socio-cultural activities/ (Type-II) training facilities that can have community level public gatherings/ functions and public events. Can also include facilities for cultural and information services. [eg. Multipurpose community hall, Socio-cultural Institute (with facilities for learning and performance of music, dance, other performing arts, exhibition space, art gallery, library, creative workshops, auditorium, small theatres), Cultural and Information Centre, etc.] 3 Socio-Cultural facility Premises with facilities that promote culture & other (Type-III) creative as well as recreational activities. (eg. Recreational Club, Public Library, etc.) 4 Socio-Cultural facility Premises with facilities for holding large gatherings and (Type-IV) events like exhibitions, international/ national conferences, meetings, symposiums etc. These may also include large entertainment/ socio-cultural facilities. (eg. Socio cultural centre, Science Centre, Planetarium, Museum, International Convention Centre, Exhibition- cum- fair ground) B. Permissible Activities Table 22. 73 Use Premises and Activities Permitted - Socio-Cultural Facilities Use Zone RD PS 1 Socio- Socio- Socio- Socio- Sr. no Use Premise Cultural Cultural Cultural Cultural Facility Facility Facility Facility (Type-I) (Type-II) (Type-III) (Type-IV) Activities Permitted 1 2 3 4[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 723 1 Canteen 2 Bank Extension Counter 3 Vending Booth/ Kiosks 4 Restaurant Watch & Ward 5 Residence (upto 20sqm.) Exhibition centre and art 6 gallery 7 Community Hall 8 Hostel Music, dance and drama 9 training centre 10 Library/ Reading room 11 Auditorium Hall for public gatherings, 12 marriages, cooking facilities and other facilities 13 Museum 14 ATM 15 Health care facility 16 Commercial office 17 Hotel 18 Police Post 19 Fire post Accommodation for 20 Maintenance Staff Open Air theatre/ 21 amphitheatre 22 Fair ground Convention and 23 meeting space/ convention centre 24 Film centre Multipurpose training 25 and meeting rooms 26 Retail Shop Guest House/ Guest 28 Rooms 29 Indoor/ Outdoor Sports 30 Swimming Pool C. Development Control Norms Table 22. 74 Socio-Cultural facilities Min. Plot Max. Min Area (sqm)/ Ground Use Premise No.(s) FAR ROW Height(m) unit Coverag[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 724 e (%) (m) Socio-Cultural facility (Type- I) 1 800-2000 30% 150 12 - Socio-Cultural facility (Type- II) 2 1000 40% 120 24 - Socio-Cultural facility (Type- III) 1 5000 40% 120 24 Socio-Cultural As As per 35% facility (Type- Per 120 30 requirement + 5% IV)* requirement (MLCP) Notes: * For activities like exhibition-cum-fair grounds, max. ground coverage shall be 20% and 5% ground coverage for MLCP and max. FAR shall be 20. Other Controls: i. Recreational Clubs located in LBZ Area, Civil Lines Bungalow Area, Recreational Use Zones and existing on Heritage Structures will be dealt on case-to-case basis and Technical Committee of DDA will approve the Development Controls norms based on the existing status. ii. In the open area apart from outdoor games / sport facilities, swimming pool would be permissible upto an area of 300 sqm. free from ground coverage. iii. In case of Banquet Hall - Basements within the ground envelope shall be allowed for parking. Stilt floor for parking is permissible - 30% of basement area for services / storage shall not be counted in FAR. iv. In case of International Convention Centre, maximum 10% ground coverage shall be allowed for providing atrium. In case, the permissible additional ground coverage for atrium is utilized, 25% of the utilized ground coverage shall be counted towards FAR v. For the above plots, no height restriction shall be applicable, subject to clearance from AAI, Delhi Fire Service, and other Statutory bodies. vi. Conditions for Ancillary Use: a. In case of Socio-Cultural facility (Type-II & III): Support/ ancillary facilities shall be allowed upto a maximum of 20% of permissible FAR. b. In case of Socio-Cultural facility (Type-IV) except International convention centre and Socio-cultural centre: Support/ ancillary facilities shall be allowed upto a maximum of 50% of permissible FAR. c. In case of International Convention Centre: Exhibition space, Convention and meeting space shall be minimum 40% of permissible FAR. Support/ Ancillary facilities (Retail shop, office space/ commercial office, Hotels and related activities) shall be permitted upto maximum 60% of permissible FAR. d. In case of Socio-Cultural Centre: Socio Cultural activities shall be minimum 40% of permissible FAR. Support/ Ancillary facilities (Retail shops, office space/ commercial office, Hotels and related activities) shall be upto maximum 60% of permissible FAR. 22.15.8 Other-Community Facilities[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 725 A. Use Premise and Definitions Table 22. 75 Use Premise and Definition - Other-Community Facilities S. No. Use Premise Definition 1 Night Shelter Premise having the facility for providing the night accommodation to individuals without any charges or with token charges. It may run by local government or voluntary agencies. 2 Other Community Facility Premises that can accommodate multiple small- (Type-I) scale community/ religious facilities (eg. Small religious facility, etc.) 3 Other Community Facility Premise having facility of caring and training, boarding & (Type-II) lodging of elderly/ differently abled persons/ mentally challenged, women and children. It may also include residential facilities for working women / men and education/ training facilities for adults. (eg. Old Age Home, Care Centre for differently abled persons / mentally challenged, Working women-men hostel, Adult education centre, etc.) 4 Other Community Facility Premises with facilities for correction, counselling and (Type-III) accommodation of child in conflict with law or who have committed an offence. Related judicial facilities and services for behavioural reforms may also be located here. (eg. Reformatory/ Observation homes/ Special Homes/ Juvenile homes) 5 Other Community Facility Premises for large religious facilities with high footfall. (Type-IV) (eg. Large religious facility) B. Permissible Activities Table 22. 76 Use Premise and Activities Permitted - Other-Community Facilities Sr Use Zone RD PS 1 . n o Use Premise Night Other Other Other Other Shelte Communit y Communit y Communit y Communit y r Facilities Facilities Facilities Facilities (Type-I) (Type-II) (Type-III) (Type-IV) Activities Permitted 1 2 3 4 5 1 Accommodation for staff 2 Hostel 3 Retail shop (upto 20 sqm.) 4 Bank extension Counter[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 726 5 Accommodation for preachers/ devotees/ management staff (Max. 15% of total FAR) 6 Langar Hall/ Kitchen 7 Prayer halls 8 Auditorium 9 Museum 10 Museum/Art Gallery/ Exhibition Centre 11 Training Centre for Yoga 12 Care home with residential facility 13 Health facilities/gym 14 Dining facility 15 Welfare Centre 16 Night Shelter and related facilities. 17 Temple, Mosque, Church, Gurdwara, Synagogue, Ashram 18 Bathing Ghat 19 Gaushala 20 Dargah 21 Charitable Health Facility 28 Canteen 29 Restaurant 30 Watch and ward residence (upto 20 sq m). 32 ATM 33 Space for administration office 34 Facilities for meditation/ spiritual training 35 Facilities/ studios for training in music and other forms of art[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 727 C. Development Control Norms Table 22. 77 Other-Community facilities Max. Min. Plot Area Min S. Ground Height Use Premise No.(s) (sqm)/ unit FAR ROW No. Coverage (m) (m) (%) LOCAL LEVEL Population upto 10000 No height restriction subject to Other clearance Community from AAI, 1 2 400 40 100 12 Facility (Type- I) DFS, DMA, NMA and other statutory bodies. COMMUNITY LEVEL Population upto 100000 1 Night Shelter* 1 100 60 200 - 26m SUB-CITY LEVEL Population upto 500000 No height restriction subject to Other clearance Community from AAI, 1 5 1000 40% 120 18 Facility (Type- DFS, DMA, II)** NMA and other statutory bodies. CITY LEVEL Population upto 2000000 Other No height Community As per restriction 1 2000 40% 150 18 Facility (Type- requirement subject to III) clearance from AAI, Other DFS, DMA, Community As per As per NMA and 2 30% 100 24 Facility (Type- requirement requirement other IV) statutory bodies. Other Controls: i. Sites for Dhobi ghats / laundry shall be provided in Residential use zone / PSP facility areas as per the norms of local body. In such sites following facilities shall be permitted: Overhead tank, Underground Tank, Oxidation Pond, Septic Tank[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 728 Sewerage Pumping station, Public Toilet & Urinal, Electric Sub-station, Dhallao and Dustbin, Dhobi Ghat, Machine Laundry. ii. *Location of night shelter is to be decided by the Local Authorities / GNCTD based on practical demand / assessment. For geographical distribution of night shelters a minimum of at least one night shelter per administrative unit such as the Revenue Sub- Division or jurisdiction of Police Station may also be taken as criteria for planning purposes. Night shelter shall be permitted in new proposed constructions by adopting innovative concepts such as integrated complex with commercial space on the ground floor and night shelter on the first floor; and in existing buildings with suitable modifications. Night shelter can be developed within the Railway Terminals, Bus Terminals, Wholesale/Retail markets, Freight Complexes, Police Stations etc. by the concerned agencies such as Railways, Health, Industry, DTC, Police, etc., wherever feasible. iii. **Location of Working Men-Women Hostels shall be decided on the basis of proximity with work/ employment centres and on the basis of demand assessment. iv. Conditions for Ancillary Use: a. In case of Other-Community Facilities (Type-I): Support/ ancillary facilities shall be allowed maximum upto 50 sq.m. b. In case of Other-Community Facilities (Type-II and III): Support/ ancillary facilities shall be allowed maximum of 20% of permissible FAR. c. In case of Other-Community Facilities (Type-IV): Support/ ancillary facilities shall be allowed maximum of 5% of permissible FAR. 22.15.9 Cremation Ground, Burial Ground & Cemetery A. Use Premise and Definitions Table 22. 78 Use Premise and Definition - Cremation Ground, Burial Ground & Cemetery S. No. Use Premise Definition 1 Burial Ground A premise with facilities for burying of dead bodies. 2 Cremation Ground A premise with facilities of performing last rites of dead bodies by burning. 3 Cemetery A premise with facilities for burying of dead bodies. 4 Electric Crematorium A premise with facilities for last rites of the deceased. 5 Burial Ground for Animals A premise with facilities for burial of animals B. Permissible Activities Table 22. 79 Use Premise and Activities Permitted - Cremation Ground, Burial Ground & Cemetery[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 729 S. Use Zone PS1 No. Use 1 2 3 4 5 Premise Burial Crematio Cemete Electric Burial Groun n r y Crematori Groun Activities d Ground u m d for Permitted Animals 1. Sheds for performing rituals 2. Facilities for registration of deaths 3. Retail shops of woods, flowers and other related material 4. Drinking water 5. Parking 6. Watch and ward residence (20 sq.m.) C. Development Control Norms Table 22. 80 Cremation Ground, Burial Ground & Cemetery S. Use No Minimu Maximu FAR Mini Height No Premise m Plot m mum (m) Area Ground ROW (sq.m.) Coverag (m) e 1 Burial 1 for 10 lakh 10000 NA NA 18 NA Ground population 2 Cremation 1 for 5 lakh 5000 50% 100 18 No height restriction Ground population subject to clearance from AAI, DFS, DMA, NMA and other statutory bodies 3 Cemetery 1 for 10 lakh 10000 NA NA 18 NA population 4 Electric 1 for 5 lakh 5000 50% 100 18 NA Crematoriu m population 5 Burial 1 for 10 lakh 2000 NA NA 18 NA Ground for population Animals[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 730 Other controls: i) In case of Cremation Ground, provisions for crematoriums (basic/ green/ gasifier based/ electric) shall be made. In the existing cremation grounds, provision of crematorium is to be made 22.15.10 Multi-Facility Plot Table 22. 81 Development Control Norms of Multi facility Plot Use Plot Ground FAR ROW (m) Height Activities Permitted premise Area Coverage (minimum) (m) (sq.m.) (maximum) No height Mix of PSP facilities at restriction the local level (Health, subject to Education, Socio- clearance cultural, Multi from AAI, Other-Community Facility 500 50% 200 18 DFS, DMA, facilities, Plot NMA and Communication other facilities) statutory bodies. Note: Single function shall be permitted upto max of 2/3 of BUA, to facilitate multiple facility on the plot. 22.15.11 Public & Semi-Public Facilities / Premises The following norms shall be applicable in case of PSP facilities / premises, for which specific development controls have not been specified. 1. Max. Ground Coverage 30% 2. Max. Floor Area Ratio 120 3. Max. Height 26 m. Note: i. In case of plots allotted to political parties by the government land housing agencies, up to 15% of maximum FAR may be utilized for residential hostel accommodation. ii. Amalgamation of the smaller PSP plots or sub division of the larger PSP plots for a single or its multiple use, is allowed with the permissible PSP facilities as per the provisions of MPD-2021. 22.16 Permission of Use Premises in Use Zones As part of approval of layout plan or as a case of special permission from the Authority, Permission of selected Use Premises in Use Zones RD, C1, C2, M, PS are as per the following: Table 22. 82 Permission of Use Premises in Use Zones S. Use Zones Use Premises No. RD C 1 C 2 M PS RD RESIDENTIAL i. Residential plot – Plotted Housing P P** NP NP NP ii. Residential plot – Group Housing P P NP P P iii. Studio Apartment P NP NP NP NP iv. Residence - cum - Work Plot P P NP NP NP v. Foreign mission P P NP NP NP vi. Hostel / Old age home P P NP P P[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 731 vii. Short term Accommodation – Hostel / P P P P P Guest house / Lodging & Boarding House / Sarai / Working Women-Men Hostel, Dharamshala and its equivalent / Service Apartment Multipurpose Community Hall / Barat Ghar P P NP P P viii. ix. Night Shelter P P P P P x. Community / Recreational Hall, Library, P P P P P Reading Room, Society Office, Crèche and Day Care Centre. xi. State Bhawan/ State Guest Houses P P P P P C COMMERCIAL i. Local Level (Convenience / Local P P P P P shopping centre) ii. Cinema / Multiplexes NP P P P* NP iii. Service markets / Informal Bazaars P P P P NP iv. Wholesale Trade NP P P NP NP v. Storage, godown and warehousing, cold NP NP P P NP storage & Ice factory, gas godown. vi. Guest House/ Lodging & Boarding House P P P P P vii. NP P P P P Service Apartment viii. NP P P P NP Hotel P RECREATIONAL i. Recreational (Park, Play grounds, P P P P P Swimming Pool) / Sports Complex/ Stadium/ Amusement parks/ Recreational Clubs etc. M INDUSTRY i. Industrial plot, flatted group industry NP NP NP P NP ii. Service centre & Service industry NP P P P NP T TRANSPORTATION i. Circulation (Road network with street P P P P P furniture, Bus terminal, MRTS stations, Parking etc. ii. Bus depot & Workshop NP NP NP P NP iii. Multi-level parking for private modes NP P P P P G GOVERNMENT i. Local / Government maintenance P P P P P Offices ii. Offices of utility services providing P P P P P agencies iii. Government Offices (Central / State NP P P P P Government / Local Bodies), Integrated Office Complex iv. District Court/ Family Courts NP P P P P PS1 PUBLIC AND SEMI PUBLIC FACILITIES Health i. Hospital (0.2 ha. to 1.5 ha.) P P NP P P ii. Tertiary Health Care Centre P P NP P P iii. Primary Health Centre / Family Welfare P P NP P P Centre / Maternity Home / Dispensary etc., Pediatric Centre/ Geriatric Centre,[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 732 Voluntary Health Services, Extended health-care facilities (like transition- homes, respite care centres, Pathology laboratory, Small collection centres), De- addiction Centres iv. Nursing Home / poly clinic / clinic / clinical P P NP P* P laboratory etc. v. Dispensary for pet and animals P P P P P Education i. Primary school / Middle school, Pre- P NP NP NP P primary/ Nursery/ Montessori schools, ii. Creche & Day care centres, Anganwadi, P P P P P Play schools iii. Sr. Secondary School P NP NP NP P iv. School for Mentally Challenged / P NP NP NP P differently abled persons v. Technical Training centre (ITI / Polytechnic/ P P NP P P Vocational/ Training Institute/ Management institute/ Teacher Training Institute, etc.), Skilling centres vi. Research & Development Centres NP P NP P P Facilities i. Bus terminal, taxi stand, milk / P P P P P vegetable booths, religious premises, vending booth, petrol / CNG filling pump, recreational club, police outpost, police post, police station, fire post, fire station, post office, & telegraph office and telephone exchange. ii. Care centres for differently-abled and mentally challenged, Orphanage/ P NP NP P P Children's Centre, Senior citizens’ club P: Permitted P*: Permitted only in Commercial Centres NP: Not Permitted P**: Special permission as per Mixed use/ Special Area Regulations Note: 1. Park, Open Parking, Circulation and Public Utilities/convenience are permitted in all Use Zones. 2. The permission of Use Premise in the following Use Zones shall be governed by the specific function of the Use Zone. a. C3- Hotel, b. P3- Historical Monuments, c. T1- Airport, d. T2- Terminal / Depot - Rail / MRTS / Bus / Truck, e. T3- Circulation - Rail / MRTS / Road, f. U1-Water, U2-Sewerage, U3-Electricity, U4-Solid Waste, U5- Drain, g. G1-President Estate & Parliament House, h. G3-Government Land (Use Undetermined), i. PS -Cremation and Burial Ground, Religious, j. Green Development Area k. W2-River & River Flood Plain 22.17 Other Development Codes For each Use Premise, the following DCNs shall be applicable. Wherever DCNs are not mentioned in the Plan or this section, National Building Code shall be[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 733 referred. 22.17.1 High Rise Buildings i. Buildings taller than 15 m (without stilt) and 17.5 m (including stilt) in all use zones will be considered as a High Rise Building. ii. In case of provision of stack-parking in stilt floor, minimum height of 2.4 m. for stilt floor may be relaxed. However, in case of stack parking the height shall be as per design and structural safety requirement. iii. Intermittent service floor may be permitted for installation of equipments and services required for the maintenance of the building with prior approval of the agencies concerned and is not to be counted in FAR. The height of the service floor is to be decided based on the depth of structural members, the height requirement for providing water-reservoirs, other equipments, etc. Height below bottom of any beam shall not be more than 1.8 m. from the finished floor level excluding false floor if any. iv. Basement will be permitted within the setback lines subject to clearance from local bodies / deptts. Concerned municipal corporation and Fire Deptt. Where there are no setbacks, basements should be permitted upto 2 meters and where there is setback, it should be 6 meters from the plot boundary. v. Podium(s) will be permitted within the setback lines subject to clearance from the fire department. The movement of vehicles and parking shall be restricted within the podium. Rooftop to be allowed for uses such as swimming pool, landscaping, and related structures. vi. Other conditions for basement will be as per Clause 22.16.3. 22.17.2 Setbacks: Minimum setbacks shall be provided as per the Table 22.81 for all developments other than residential plotted and areas specifically mentioned in the Plan. Table 22. 83 Minimum Setbacks (Other than Residential Plotted Development) Plot size (in sq.m) Minimum Setbacks Front (m) Rear (m) Side (m) (1) Side (m) (2) Upto 60 0 0 0 0 Above 60 & upto 150 3 1.5 (avg.) - - Above150 & upto 300 4 2 (avg.) - - Above 300 upto 500 4 3 3 - Above 500 upto 2,000 6 3 3 3 Above 2,000 upto 9 6 6 6 10,000 Above 10,000 15 12 12 12 Note: i. In case the permissible coverage is not achieved with the above given setbacks, the setbacks of the preceding category may be allowed. ii. The setbacks are subject to requirements of height and ventilation as per building byelaws. iii. In case a layout is sanctioned with more than the minimum prescribed setbacks, the same shall be followed in the sanction of the building plans. iv. Technical Committee of DDA may relax setbacks, ground coverage and height in special circumstances. v. ESS wherever required to be provided within the plot, is allowed by shifting of side / rear setbacks. 22.17.3 Basements: i. Basement(s) up to the setback line, maximum equivalent to parking and services requirement, such as air conditioning plant and equipment, water storage, boiler, electric sub-station HT and LT Panel rooms, transformer compartment, control room, pump house, generator room and other mechanical services and[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 734 installation of electrical and firefighting equipment, and other services required for the maintenance of the building with prior approval of the concerned agencies, could be permitted and not to be counted in FAR. ii. In case of residential use, basement shall not be counted towards FAR if used for household storage and parking. Basement if used for permissible mixed-use activities shall be counted towards FAR. If such use of basement leads to exceeding the permissible FAR on the plot, appropriate charges prescribed with the approval of government, shall be levied on the additional FAR. iii. In case of Hotels, use of basement for laundry, cold room for storing food articles, linen store, garbage room, housekeeping store and cold storage may be allowed. iv. In case of Healthcare facilities, basement after utilization for Parking; Services Requirements such as air conditioning plant and equipment, water storage, boiler, electric sub-station, HT & LT panel rooms, transformer compartment, control room, pump house, generator room; staff locker room, staff changing room, staff dining facilities without kitchen facility, Central sterile supply deptt., back end office; Other Mechanical Services; Installation of Electrical and fire fighting equipment; and Other Services like kitchen, laundry and radiology lab and other essential services required for the maintenance/functioning of the building may be used for healthcare facilities with prior approval of the concerned agencies. v. In case of high rise buildings, basement shall be permitted 6m from the plot boundary, within the setback lines, subject to clearance from concerned authorities. vi. The basement(s) beyond building line shall be kept flushed with the ground and shall be ventilated with mechanical means of ventilation. vii. Basement(s) shall be designed to take full load of the fire tender, wherever required and subject to adequate safety measures. viii. In case the basement is used for activity in conformity with the use premises, wherever permitted, the same shall be counted in FAR subject to clearance from the Fire Authorities and other statutory bodies. ix. The ESS, fire fighting installations and underground water tank shall neither be counted in ground coverage nor in FAR. 22.17.4 Service Plans The Developing Agency should provide for the following in layout plans of plots of size 3000 sq.m and above: i. Recycling of treated waste water with separate lines for potable water and recycled water. Dual piping system to be introduced. ii. Ground water recharge through rain water harvesting, conserving water bodies and regulating groundwater abstraction. iii. Treated sewage effluent should be recycled for non-potable uses like gardening, washing of vehicles, cooling towers, etc. iv. Utilities such as, underground water storage tank, roof-top water harvesting system, separate dry and wet dustbins etc. are to be provided within the plot. v. All hospitals, commercial, industrial, hotels, restaurants, auto workshops, etc. will have to make arrangements for primary effluent treatment within the plot. vi. Provide ESS and generator and to submit energy consumption/audit will be submitted at the time of sanction of building plans. vii. Provision of cavity walls, atriums, shading devices in buildings will be encouraged to make them energy efficient. viii. Solar heating system will be provided on all plots with roof area of 300 sqm and above. ix. In order to encourage the above, 1% to 4% extra ground coverage and FAR, on each, may be given as an incentive by the local bodies, depending upon the provisions made. In exceptional cases 5% incentive may be permitted. x. These incentives shall be based on the rating criteria prescribed by ‘Green Rating for Integrated Habitat Assessment’ (GRIHA) for green buildings. xi. In case of non-compliance of above, after obtaining occupancy certificate, penalty at market rate shall be levied for incentive FAR by land owning agency.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 735 The regulations for enforcement of above shall be prepared by the Director, Local Self Government, GNCTD in consultation with Environment Department, GNCTD within a period of six months (after notification of modifications) and notified with the approval of the Authority/Central Government 22.17.5 Regulations for Building Controls within Use premises The objective of these regulations is to provide controls for building(s) within use premises excluding the internal arrangement, which are covered in Building Bye-laws. General Notes: i. Where development controls are not stipulated for any use premise, the same can be formulated by the Authority. ii. The mezzanine floor and service floor wherever provided shall be considered as a part of the total FAR. In case of the buildings with 26 m. and more height in all use-zones, Technical Committee of DDA may permit the following in special circumstances: a) In case of provision of stack-parking in stilt floor or basement, minimum height should be 2.4 m. b) Intermittent service floor may be permitted for installation of equipments and services required for the maintenance of the building with prior approval of the agencies concerned and are not to be counted in FAR. The height of the service floor is to be decided based on the depth of structural members, the height requirement for providing water- reservoirs, other equipments, etc. The height of Service floor in the building shall be limited to 1.8 m. iii. If the building is constructed with stilt area of non-habitable height (2.4 mts) and is proposed to be used for parking, landscaping, etc. the stilt floor need not be included in FAR. iv. Wherever the building regulations are given for different categories of plots, the area covered and the floor area shall in no case be less than the permissible covered area and floor area respectively for the largest size of plot in the preceding category. v. In case of all the plots of size 1000 sq.m. and above, except ‘Residential Plot – Plotted Housing’, atrium will be permitted with stipulations – Maximum 10% additional ground coverage shall be allowed for providing atrium. In case, the permissible additional ground coverage for atrium is utilized, 25% of the utilized ground coverage shall be counted towards FAR. 22.17.6 Norms for non-residential use within residential use premises i. Three types of non-residential activities shall be permitted within residential use premises: a. Professional activities b. Other activities – Commercial and PSP uses ii. Non-residential use within residential use premises, (including small shops) shall not be permitted in the Lutyens' Bungalow Zone, Civil Lines bungalow zone, government housing, institutional / staff housing of public and private agencies and buildings / precincts listed by the Heritage Conservation Committee.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 736 iii. Identification of Mixed-Use areas/ Streets: Following streets/ areas shall be considered as Mixed Use areas/ streets and Commercial Streets for the purpose of this Clause: a. All streets/ stretches already notified as Mixed Use street or Commercial street by the Competent Authority; b. Residential areas and streets/ stretch earlier declared as commercial areas / streets or where commercial use was allowed in MPD-1962 shall continue to the extent as was permissible as per MPD-1962; c. Commercial activity existing from prior to 1962 in residential areas, subject to documentary proof thereof; d. Plotted development in pre-1962 colonies shall be treated as rehabilitation colonies in their respective categories (A to G) for the purpose of this chapter. e. Any street /stretch under the process of notification by the Competent Authority or where the matter is presently sub-judice, upon completion of the notification process. f. No new streets other than already identified shall be notified as Mixed Use/ Commercial Use streets. g. All existing plots and uses as approved for mixed use under MPD-21 shall continue to be permitted as per approved conditions. iv. Professional Activities: Professional activities shall mean those activities involving services based on professional skills namely Doctor, Lawyer, Architect, and Chartered Accountant, Company secretary, Cost and Works Accountant, Engineer, Town Planner, Media professionals and Documentary Film maker, Management* Professionals and Dietician/ Nutritionists. These shall be permitted in all residential use premises (plotted development and group housing) Professional activity is permissible in: a. In group housing, and plotted development with multiple dwelling units, professional activity shall be permitted on any floor subject to maximum of 50% of the permissible or sanctioned FAR, whichever is less, of each dwelling unit. b. In the case of plotted development with single dwelling unit, professional activity shall be permissible on any one floor only, but restricted to less than 50% of the permissible or sanctioned FAR whichever is less on that plot. c. Professional activity in basements is permissible in plotted development, subject to relevant provisions of Building Bye-Laws, structural safety norms and fire safety clearance. In case, the use of basement for professional activity leads to exceeding the permissible FAR on the plot, such FAR in excess shall be used subject to payment of appropriate charges prescribed with the approval of Government. d. No combining of DUs shall be permitted. All required licenses, permissions and clearances for conducting such activities shall be obtained from concerned agencies. v. Provisions for identified Mixed-Use areas/ Streets: Following streets/ areas shall be considered as Mixed Use areas/ streets and Commercial Streets for the purpose of this Clause: a. All streets/ stretches already notified as Mixed Use street or Commercial street by the Competent Authority; b. Residential areas and streets/ stretch earlier declared as commercial areas / streets or where commercial use was allowed in MPD-1962 shall continue to the extent as was permissible as per MPD-1962; c. Commercial activity existing from prior to 1962 in residential areas, subject to documentary proof thereof; d. Plotted development in pre-1962 colonies shall be treated as rehabilitation[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 737 colonies in their respective categories (A to G) for the purpose of this chapter. e. Any street /stretch under the process of notification by the Competent Authority or where the matter is presently sub-judice, upon completion of the notification process. f. No new streets other than already identified shall be notified as Mixed Use/ Commercial Use streets. g. All existing plots and uses as approved for mixed use under MPD-21 shall continue to be permitted as per approved conditions. vi. Household Industries: Industrial activities (listed in Annexure 4) shall be permitted as Household Industries in all residential use premises, as per following conditions: a. Maximum number of workers: 9 b. Maximum power load: 11 kw c. No inflammable or hazardous substance is stored within premise. d. Household industrial units shall be allowed on any floor to the extent of 50% of permissible floor area of the dwelling unit. Such activities shall not be permitted in basements. e. Separate industrial electric connection (single phase) and Municipal License shall be obtained from the concerned authorities. f. None of the industries in residential areas shall be allowed to carry out processes such as anodizing, bleaching, burning of coal, canning facility, dyeing, electroplating, moulding works, use of CFC gases, varnishing, washing and other water intensive processes. vii. Permissibility of Commercial and Other activities in mixed use a. Commercial activities Table 22. 84 Types of activities permitted in identified mixed use areas/ streets and commercial streets Activities Type of In case of In case of notified uses notified Mixed Commercial permitted Use Street Street Commercial - Retail Shop, Entire ground floor up a. Permitted up to Repair to permitted ground 100% of FAR Shop, coverage b. All uses as Personnel permitted in LSCs Service shall be allowed Shop c. Banquet Hall shall - Office also be permitted - Restaurant[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 738 Notes: i. The following activities shall not be allowed under Mixed Use: a) Retail shops of building materials [timber, timber products (excluding furniture), marble1, iron and steel, (gravel, cement and sand2], firewood, coal and any fire hazardous and other bulky materials. b) Repair shops / workshops of automobiles, tyre resoling and re-treading, and battery charging. c) Storage, go-down and warehousing. d) Junk shop (except paper and glass waste) e) Liquor shop f) Printing, dyeing and varnishing g) Any other activity that may be notified from time to time by Government. ii. On mixed-use or commercial notified streets with 24m and above ROW,  Shops of finished building material (including gravel, sand and cement) will be permitted only if no cutting and polishing activity is undertaken. These shall be permitted on plots of minimum 100 sqm with maximum 50% ground coverage.  Automobile repair shops and workshops shall be permitted on 30m or above ROW. iii. In case of DDA flats, the entire ground floor of the flats on notified streets shall be permitted as follows:  Only one Small Shop- maximum 20 sqm area unit shall be permitted.  No amalgamation of flats shall be permitted iv. If use of basement for non-residential activities leads to exceeding the permissible FAR on the plot, such excess FAR shall be used, subject to payment of appropriate charges prescribed by the competent authority. b. Other activities "Other activity" are broadly in the nature of 'Public and Semi-Public' facilities as per conditions specified and plots abutting roads of minimum ROW prescribed. For other activities permissible in residential plots following conditions shall be applicable, whether or not the road is notified as mixed use street: i. In A, B, C & D colonies, all activities shall be permitted on minimum 200 sq.m plots and in E, F, G colonies on minimum 75 sq.m plots. Min. RoW shall be as follows: Table 22. 85 Min. RoW conditions for other activities Colony type Condition A & B colonies Only on 24m and above ROW C & D colonies Only on 24m ROW and above in regular residential plotted development, 9 m ROW in rehabilitation colonies and in regularized-unauthorized colonies, resettlement colonies, AOWC and urban villages E, F & G colonies Only on 13.5m and above ROW in regular residential plotted development, 9 m ROW in rehabilitation colonies and in regularized- unauthorized colonies, resettlement colonies, AOWC and urban villages Note: Any existing uses approved in all types of colonies (prior to notification of the prevailing master plan) as per the provisions of MPD-21 shall continue to be permitted. ii. Other activities shall include the following: Table 22. 86 Other activities permitted in identified mixed use areas/ streets and commercial streets[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 739 Other Type of uses permitted Other Condition Activitie s a. Other activities shall be permissible upto PSP  Bank 2/3rd of total FAR. In case of Banks it  Dispensary, Clinics, shall be limited to 600 sq.m. Clinical laboratory, b. On plots abutting 24 m RoW/ notified Pathology laboratory, mixed use/ commercial street, other Small collection centres, activities shall be permissible upto  Maternity Home, Nursing 100% of permissible FAR Home/ Polyclinic/ Primary c. Banks lockers if part of existing bank Health Centre, Nursing shall be allowed in the respective home, Family Welfare basements of same premises. Centre Pediatric Centre/ d. In A & B colonies following shall Geriatric Centre be permitted: Diagnostic Centre, etc.  Guest House (incl. Lodging houses)  Wellness Centres  Diagnostic Centre, including day spas/  Maternity Home, Nursing Home/ weight-loss centres/ Polyclinic, Primary Health Centre, ayurvedic centres offering Family Welfare Centre, Pediatric ayurvedic treatment/ Centre/ Geriatric Centre, Extended salons offering fitness health-care facilities (like transition- and aesthetic medical homes, respite care centres, services Special facilities for differently-  Pre-primary/ Nursery/ abled and mentally challenged Montessori schools; Play persons) schools, Creche & Day  Pre-primary School/ Nursery/ care centres Montessory/ Day Care shall  Coaching Centre, be permissible Computer training institute  Banks, NGOs, Fitness centres and  Vocational Training wellness centres shall be Centre, Skilling centres, permissible as per provisions of Coaching Centres, MPD-2021.  Senior citizens’ meeting e. Pre-Primary/Nursery, Montessory/ room, Banquet Hall, Creche/ Day Care uses shall not Indoor games facilities, be permitted in basement. Fitness centres and Gym, f. Skilling centres, Coaching Centres, Guest house (including Computer Training institute uses shall lodging houses) only be permitted on plots with minimum irrespective of number of area of 1000 sq.m on roads with 24m rooms. ROW. g. Banquet Hall shall only be permitted on 24m and above ROW. These shall be restricted to basement and ground floor. h. In case of Health facilities, radiation- based activities shall not be permitted in Residential areas. i. Only the Non-profit organizations/ NGOs existing as on 07.02.2007 and registered under applicable Acts, may continue to operate. j. Restaurants on ground floor only with[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 740 valid appropriate licenses and with all statutory clearances, as existing on or before the date of notification shall only be permissible on notified mixed use streets viii. Permissibility of Commercial and Other Activities in Mixed Use in Walled City and Cultural Precincts Table 22. 87 Norms applicable for Walled City and for plots identified as part of Cultural Precincts Type of uses permitted ROW requirement Minimum plot size Small Shops No minimum No minimum requirement requirement. Max. 1 unit per plot. Retail Shop, Repair Shop, Personnel Service Minimum 6m ROW 75 sq.m Shop, Office and Restaurant) - Dispensary, Clinics, Clinical Minimum 9m ROW 75 sq.m laboratory, Pathology laboratory, Small collection centres, - Maternity Home Nursing Home/ Polyclinic - Primary Health Centre - Family Welfare Centre - Pediatric Centre/ Geriatric Centre - Diagnostic Centre - Pre-primary/ Nursery/ Montessori schools; Play schools - Creche & Day care centres - Coaching Centre, Computer training institute - Vocational Training Centre, Skilling centres, Coaching Centres - Reading room/ library, Youth Centre, Senior citizens’ meeting room, Facilities for meditation/ spiritual training, Banquet Hall, Indoor games facilities, Fitness centres and Gym, Small Religious facility, Post Office Counter ix. Non-residential activities in Group Housing In case of Group Housing Plots Small shop and Retail Shop, Repair Shop, Personnel Service Shop specially provided for in the layout plan shall be permitted up to a maximum of 1.5% of the permissible FAR or 1000 sqm, whichever is less. At least 50% of such FAR shall be mandatorily utilised for provision of small shops units catering to local needs. A minimum of 4 shops of 20 sqm each shall be provided. Such uses may be provided in the form of vertical mixing or separate block within the plot. x. Additional Norms applicable on all non-residential activities within residential development: a. DCN as applicable for the particular residential use will continue to be applicable, even if the plot / dwelling unit is put to mixed use. b. In Plotted Housing plots, boundary wall shall be optional along the main access road. In plots with stilt parking, active frontage may be maintained by providing shop fronts and other permitted mixed-use activities. ??Such shops shall be counted towards FAR. c. Wherever a service road is available or proposed, then the mix-use premises should be approached from such service road and not directly from the main[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 741 carriageway. d. No encroachment shall be permitted on the streets or public land. e. Any trade or activity involving any kind of obnoxious, hazardous, inflammable, non- compatible and polluting substance or process shall not be permitted. f. Applicable charges shall be as under:  All premises with non-residential activities shall be required to declare such Mixed Use to the concerned local body and pay necessary charges as per the process notified by the competent authority.  All premises with non-residential activities shall be liable for payment of applicable Mixed Use charges to the concerned local body as per the rates notified by the competent authority, for the period during which the property is used for non-residential activities.  The allottee / owner shall obtain pay all necessary fees or charges before using the premise for any non-residential activity.  The local body concerned shall be responsible for the conduct of test check of properties under mix use, whether registered with it or not.  In addition to other penal action available under the relevant act, properties found to be under mix use, without registration or in violation of the terms of this notification shall be liable to pay, to the local body, a penalty as prescribed by the competent authority from time to time. 22.18 Green Blue Factor (GBF) Computation of GBF shall be done at the plot level and the same shall be integrated as a condition for all building and layout sanction. The factors and methodology to be used for GBF computation are as follows: GBF is the ratio of the sum of area under different types of blue/green elements (as identified above) against their respective factor to the total plot area: Table 22. 88 GBF Calculator S. No. Type of Blue/green element (X) Factor 1 Impervious surface (including paved areas, black top driveways and 0 internal streets, roof surface without green roof) 2 Chlorinated water feature (e.g. swimming pool) 0.2 3 Green Wall (supported vertical systems for plants on external wall 0.2 surfaces) 4 Pervious surface with water absorbent tiles 0.3 5 Pervious surface with manicured lawn and/or Greenhouse 0.5 6 Green Roof (minimum 70% area covered with plantation and shrubs) 0.6 7 Pervious surface with natural grass/ground and vegetation (including 0.8 urban agriculture) 8 Area under tree cover (canopy density 10-40%) 0.9 9 Area under dense tree cover (canopy density 40% or more) 1 10 Open water body with non-lined bottom (non-chlorinated) 1 GBF for a plot shall be calculated using the following formula: GBF = {(Area under element X corresponding factor) +... (Area under element nX corresponding factor)}/ Total plot area 22.19 Transfer of Development Right (TDR)[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 742 Transferable Development Right (TDR) means the FAR provided in exchange of unutilized development rights on specific sites as permitted by the master plan. TDR can be utilized only in TDR receiving areas identified by the Plan. TDR shall only be awarded where land/development right is forfeited for a public purpose such as provision of essential infrastructure, regeneration of historical areas, housing for urban poor, etc. TDR shall be awarded in the form of a TDR Certificate. TDR Certificate shall be issued by Delhi Development Authority as per regulations for the same. Regulations detailing out the process of implementation of TDR shall be prepared by DDA within 6 months of the notification of this Plan. TDR Certificate shall provide development rights only within the NCT of Delhi. TDR Certificate will be valid in perpetuity and the owner can use it at any time or transfer it to any other person or entity as per the regulations. Multiple transactions are permitted on the TDR Certificate till the total value of TDR issued has been utilised. Once the TDR is completely expended, the TDR Certificate becomes null and void. A dedicated online portal for all matters pertaining to demarcating TDR generating and receiving areas, TDR issuance, tracking TDR utilization shall be set up. Computation of TDR for utilisation: The value of TDR for utilisation shall vary according to the variation in land values across the city. The following formula shall apply to rationalise the variation and compute the value of TDR to be utilised at the receiving site: Table 22. 89 TDR TDR value on the receiving site =(Rg/Rr) x Y Where, Rg = Land rate in rupees per sq.m. as per the circle rate of generating site in the year when TDR Certificate is issued. Rr = Land Rate in rupees per sq.m. as per the circle rate of the receiving site of the same year for which Rg has been considered Y = Unutilized FAR (can be whole or part of the TDR value in the Certificate) Other conditions for TDR utilisation: i. TDR shall be utilised only within TDR Receiving Areas, demarcated and notified by DDA ii. TDR shall be utilised to build over and above the permissible FAR on a receiving site/plot. iii. A plot shall be eligible to utilise TDR only if at least 50% of the area is within the notified TDR Receiving Area. Following are the identified TDR Receiving Areas and associated conditions for TDR utilisation. TDR Receiving Area in land pooling zones: 500m corridor on either side of the urban extension roads (UERs) only applicable in area notified under land pooling. (ref: DEV1) i. Only plots of minimum 3000 sq.m., with direct access from minimum 18m RoW are eligible to receive TDR. Plotted housing shall not be eligible to receive TDR. ii. TDR may be utilised up to a maximum of 10% of the permissible FAR for the same land use permissible on the plot. iii. On VM plots, TDR can be utilised as FAR for any land use after rationalisation. It shall not be linked to the land use of the receiving plot and can be utilised as residential, commercial, PSP or industrial FAR, provided the maximum FAR limit is not exceeded, and compatible uses are ensured on the plot. iv. Only 10% increase shall be permitted on the extent of FAR calculated for each[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 743 land use at sector level, for utilisation of TDR. v. TDR Receiving Area in notified TOD Nodes and Business Promotion Districts: vi. Only plots having direct access from minimum 30m RoW, coming up as TOD Schemes or Regeneration Schemes of minimum 1 ha area shall be eligible to receive TDR. vii. Maximum TDR shall be 10% of the permissible FAR. Total FAR including TDR on a plot shall not exceed 500. viii. TDR on such Schemes can be utilised for Commercial, PSP and Industrial uses. 22.20 Norms for Vertical Mixing i. Compatible uses shall be permitted to be developed as part of the same building/structure on a plot. ii. Separate entry/exits and service cores shall be provided for each use. iii. Public uses such as facilities, commerce, schools, etc. Shall be located on the lower floors with direct access from the ground level. iv. Vertical Mixing of hospitals, health care facility, university campuses, utilities, fuel stations, parks and correction/ penal facilities of any kind shall not be permitted. Local medical facilities shall be permitted as part of vertical mixing. v. Mixing shall only be permitted for compatible uses as follows: a. Only non-manufacturing industries like service industry (IT/ITES, BPO/KPO, etc.), packaging and logistics, and non-polluting MSME units can be combined with PSP. b. Schools can only be combined with residential use premises. Other educational institutions can be combined with clean industries such as those mentioned above. --- x --- x ---- x --- x --- x --- List of Abbreviation s A AI - Artificial Intelligence AAI- Airport Authority of India APRH - Affordable Public Rental Housing ASI - Archaeological Survey of India ATA - Active Travel Area AQI - Air Quality Index B B&B – Bed and Breakfast BBMB - Bhakra Beas Management Board BEE- Bureau of Energy Efficiency BFSI - Banking, Financial Services[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 744 and Insurance BID - Business Improvement District BIS - Bureau of Indian Standards BPD - Business Promotion District BRT - Bus Rapid Transit BUA - Built-up Area C CBD - Central Business District CHBS - Cooperative Housing Building Societies CBO - Community-Based Organization CBWTFs - Common Bio-Medical Waste Treatment Facilities CC - Community Centre CCTV - Closed-Circuit Television C&D wastes - Construction and Demolition Wastes CETP - Common Effluent Treatment Plant CGWB - Central Ground Water Board CMP - Comprehensive Mobility Plan CNG - Compressed Natural Gas CNCR - Central National Capital Region CP - Connaught Place CPCB - Central Pollution Control Board CPHEEO- Central Public Health and Environmental Engineering Organization CPWD – Central Public Works Department CRMP - Cultural Resource Management Plan CSC - Convenience Shopping Centre CSP- Community Service Personnel CSO – Civil Society Organization CSR - Corporate Social Responsibility CVs - Commercial Vehicles D DC - District Centres DE- Developer Entity DCN- Development Control Norms DCR - Development Control Regulations DDA - Delhi Development Authority DDMA- Delhi Disaster Management Authority DE - Developer Entity DFC - Dedicated[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 745 Freight Corridor DFS- Delhi Fire Service DDMA- Delhi Disaster Management Authority DMRC- Delhi Metro Rail Corporation DIMTS - Delhi Integrated Multi-Modal Transit System DISCOM - Distribution Company DJB - Delhi Jal Board DMA - District Metered Area DMC - Delhi Municipal Corporation DMIC - Delhi Mumbai Industrial Corridor DMRC - Delhi Metro Rail Corporation DOMC - Delhi One-Mobility Commission DPCC - Delhi Pollution Control Committee DPGS - Delhi Parks & Gardens Society DRU - Disaster Response Unit DSA - Data Sharing Agreement DSIIDC - Delhi State Industrial and Infrastructure Development Corporation DTC - Delhi Transport Corporation DTIDC - Delhi Transport Infrastructure Development Corporation DU - Dwelling Unit DUAC - Delhi Urban Art Commission DUHF - Delhi Urban Heritage Foundation DUSIB – Delhi Urban Shelter Improvement Board DVC - Damodar Valley Corporation E ECS - Equivalent Car Space ECBC- Energy Conservation Building Code ECS - Equivalent Car Space EDC - External Development Charges EDMC - East Delhi Municipal Corporation EIA - Environmental Impact Assessment EoDB – Ease of Doing Business ESZ - Eco- Sensitive Zones ESS- Electric Sub Station EWS- Economically Weaker Section EV - Electric Vehicle EWS - Economically Weaker Section F FAR - Floor Area Ratio FDI - Foreign Direct Investment FOBs -[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 746 Foot Over Bridges FTTH - Fibre-to-the-Home G GBF - Green-Blue Factor GDA - Green Development Area GDP - Gross Domestic Product GER - Gross Enrolment Rate GHG - Greenhouse Gas GIS - Geographic Information System GNCTD - Government of National Capital Territory of Delhi GPCD - Gallons Per Capita per Day GPRA - General Pool Residential Accommodation GRIHA - Green Rating for Integrated Habitat Assessment GSM - Global System for Mobile Communication GVA - Gross Value Added H HCC - Heritage Conservation Committee HCV - Heavy Commercial Vehicle HDI - Human Development Index HH - Household HT - High Tension I ICD - Inland Container Depot ICT - Information and Communication Technology ICV - Intermediate Commercial Vehicle IEC- Information Education and Communication I&FC - Irrigation and Flood Control Department IFC - Integrated Freight Complex IGP - Integrated GDA Plan IGBC- Indian Green Building Council IIA - Industrial Improvement Area INTACH - Indian National Trust for Art and Cultural Heritage IPT - Intermediate Public Transport IRC - Indian Road Congress ISBT - Inter State Bus Terminal IT - Information Technology ISBT- Inter State Bus Terminal ITES - Information Technology Enabled Services[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 747 ITI - Industrial Training Institute ITMS - Intelligent Transport Management System J JJ clusters - Jhuggi Jhopri clusters K KBI – Knowledge Based Industries KPI - Key Performance Indicator L LBZ - Lutyens Bungalow Zone LCA - Life Cycle Analysis LCV - Light Commercial Vehicle LDC - Liveable Delhi Committee L&DO - Land and Development Office LDRA - Low-Density Residential Area LDRP - Low-Density Residential Plot LEED- Leadership in Energy and Environment Design LIG - Low Income Group LoS - Level of Service LPCD - Litre Per Capita per Day LPG - Liquefied Petroleum Gas LPR - Labour Participation Rate LRT - Light Rail Transit LSC - Local Shopping Centre M MCC - Metropolitan City Centre MCD - Municipal Corporation of Delhi MCV - Medium Commercial Vehicle MDR - Mobility Data Repository M&E - Monitoring & Evaluation MOEF& CC- Ministry of Environment and Forest & Climate Change MES - Military Engineer Services MFA - Material Flow Analysis MGD - Millions of Gallons per Day MICE - Meetings, Incentives, Conferences &[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 748 Exhibitions MIG – Medium Income Group MLCP - Multi-Level Car Parking MMI - Multi-Modal Integration MMSCMD - Million Metric Standard Cubic Meter Per Day MMTH - Multi-modal Transport Hub MoHUA - Ministry of Housing and Urban Affairs MPD - Master Plan Delhi MRF - Material Recovery Facilities MRTS - Mass Rapid Transit System MSME - Micro Small Medium Enterprise MSW - Municipal Solid Waste MTA - Market Traders Association MTNL - Mahanagar Telephone Nigam Limited MU - Mega Unit MUZ - Multi- Utility Zone MW - Megawatt M&WC - Medicine & Walk-in Clinic N NBC- National Building Code NCR - National Capital Region NCRPB - National Capital Region Planning Board NCTD - National Capital Territory of Delhi NCZ – Natural Conservation Zones NDMC - New Delhi Municipal Corporation NFHS - National Family Health Survey NGO - Non-Governmental Organization NHAI - National Highways Authority of India NHC - Non- Hierarchical Commercial Centres NHCC - Non-Hierarchical Commercial Centre NMA- National Monument Authority NMT - Non-Motorized Transport NMV - Non- Motorized Vehicle NOC - No Objection Certificate NR- No Restriction NREP - National Resource Efficiency Policy NRW - Non- Revenue Water NTE - Night Time Economy O[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 749 O-D - Origin Destination O&M - Operations & Maintenance P PBS - Public Bicycle Share PDS - Public Distribution System PHPDT - Peak Hour Peak Direction Traffic PIS - Passenger Information System PLFS - Periodic Labour Force Survey PM - Particulate Matter PMD - Parking Management District PMDMU - Plan Monitoring and Database Management Unit PMDP - Parking Management District Plan PMKVY - Pradhan Mantri Kaushal Vikas Yojana PM-UDAY - Pradhan Mantri Unauthorised Colonies in Delhi Awas Adhikar Yojana PMV - Personal Motor Vehicle POPS - Privately-Owned Public Spaces PPP - Public Private Partnership PSP - Public & Semi-Public PT - Public Transport PTAL - Public Transport Accessibility Levels PUHC - Primary Urban Health Centre PVs- Passenger Vehicles PwD - Persons with Disabilities CPWD - Central Public Works Department R R&D - Research and development RFID - Radio Frequency Identification RoW - Right of Way ROB - Road Over Bridge RUB - Railway Under Bridge RRTS - Regional Rail Transportation System RRTS - Regional Rapid Transit System RTVs - Rapid Transit Vehicles RWA - Resident Welfare Association S SCADA - Supervisory Control and Data Acquisition SDC - Sustainable Delhi Committee SDG - Sustainable Development Goals SDMC - South Delhi Municipal Corporation SEZ - Special[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 750 Economic Zone SMEs - Small and Medium-sized Enterprises SPAs - Service Providing Agencies SPV - Special Purpose Vehicle SRDC - Shahjahanabad Redevelopment Corporation SRS - Sample Registration System STP - Sewerage Treatment Plant SUS - Sustainable Urban Services SWM - Solid Waste Management SWOT - Strengths Weaknesses Opportunities and Threats T TDR - Transferable Development Rights TERI - The Energy and Resource Institute TOD - Transit-Oriented Development ToR - Terms of Reference TPD - Tonnes Per Day U UBBL - Unified Building Bye Laws UCs - Unauthorized Colonies UERs - Urban Extension Roads UGR - Under Ground Reservoir ULB - Urban Local Body UMTA - Unified Metropolitan Transportation Authority URDPFI - Urban and Regional Development Plans Formulation and Implementation UT - Union Territory UTF - Urban Transport Fund UTTIPEC - Unified Traffic and Transportation Infrastructure (Planning & Engineering) Centre V VDC - Vibrant Delhi Committee VGF - Viability Gap Funding W 2Ws - Two wheelers 3Ws - Three wheelers 4Ws - Four wheelers / PV(cars) WHO - World Health Organization WSUD - Water Sensitive[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 751 Urban Design WTP - Water Treatment Plant Z ZDP - Zonal Development Plan Z-farming - Zero Acreage farming ZWLs - Zero Waste Localities Definitions A Active frontage A street stretches where there is an active engagement through visual / physical permeability between the street and the building. In active frontage the front façade of buildings open towards the streets and accommodates public activity suc as retail or recreational activities. It enhances pedestrian activities and passive surveillance on the public street. Active travel A mode of transport which involves physical activity such as walking and cycling to get from one destination to another. Active Travel Area (ATA) A precinct/area identified , to promote Active Travel by improving the density of NMT streets and/or retrofitting the existing network in that area. Adaptive reuse It is the process of reusing a listed existing building, to accommodate permissible and compatible uses . With adaptive reuse in historic buildings, continuation of the aesthetic and historic values along with prolonged useful life can be achieved. The re-use and permissible alterations of building shall be as per the grade provisions given in UBBL 2016. Affordable rental dwelling units Tenure-based residential units comprising of affordable rental dwelling units and dormitories with initial rents as prescribed by the Government. All-abilities Park Park designed with recreational facilities/activities making them inclusive for users of all abilities and age groups. Amenities FAR Amenities FAR is an incentive FAR (over and above permissible FAR) for provisioning additional social amenities in unplanned areas as part of the regeneration process. Archaeological Park A spatially contiguous area that combines assets of heritage value with ecological assets. Such parks have the potential to become an interpretative and educational resource for the public in addition to the value as a tourist attraction. Assisted purchase units Tenure-based residential dwelling units comprising of rent-to-own model units where tenants will mandatorily set aside annual lump sum amounts with the option of purchasing the unit at the end of a pre-specified period.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 752 B Bio-drainage Bio-drainage or biological drainage is the removal of excess soil water by plants through evapotranspiration, which depends upon the plant species, plantation density, depth to water table and climate. Bio-swale A green infrastructure facility designed as a vegetated, shallow, landscaped depression to capture, treat, and infiltrate stormwater runoff as it moves downstream. Blue assets Ecological features like river Yamuna and wetlands, ponds, lakes, natural drains and man-made features like canals, baolis, wells, etc. Brownfield area The existing built-up area of the city. Business Promotion Districts (BPDs) BPDs include specific existing Industrial Areas, District Centres and Institutional Areas etc. as identified in the Plan C Canopy density The proportion of an area that is covered by the crown of trees and is expressed in percentage of the total area. Carriageway A space reserved for movement of motorized and non- motorized vehicles. Circular economy An economic model in which resources are kept in use for as long as possible in order to maximize value and reduce waste. It is an alternative to the traditional linear economic model of ‘make, use, dispose’ and includes recycling and repair economies, wastewater reuse, recycled C&D waste products and construction materials (like fly ash bricks, reclaimed asphalt pavement etc.), recycling of faecal sludge, etc. City level circuits Public space networks for fostering a safe and vibrant civic society/societal behavior public realm supported with improved public amenities/facilities for facilitating cultural and/or creative economies, at times coupled with for introduction of themed events, etc Non-polluting and environment-friendly economies/industries such as knowledge and cyber economies, cultural and creative economies, green economies, circular economy etc. which has low impact on the quality of air and water, manages waste and reduces its generation, as well as minimizes chemical risks. Commercial Centers These are the major business trade & commerce & shopping centres that serve as the multi modal activities. It includes Metropolitan City Centre, District Centre, Community Centre, Local Shopping Centre, Convenience Shopping Centre and Non-Hierarchical Commercial Centre, Wholesale and Warehousing. Comprehensive Mobility Plan (CMP) A Plan presents a long-term vision of desirable mobility patterns (people and goods) for a city and provides strategy and policy measures to achieve this vision. Congestion pricing The charge applied to vehicles entering a defined area of the city so as to reduce the number of vehicles and level of congestion in those areas.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 753 Consortium A duly registered association having rights, duties & obligations in accordance with the law, consisting of multiple landowners/Developer Entities who have come together to pool land for development as per prescribed norms and guidelines. Conversion charges These are the charges prescribed by the Government from time to time & payable wherever use of the land / activity is changed, other than the license fee permitted as per law. Complete Streets Streets designed and operated such that they prioritize pedestrian and cyclists over other users, and enable safe mobility for all users, including people of all ages and abilities. Cultural and Creative Economies Economy based on industries such as tourism, design and fashion, publishing, F&B, media, visual/performing arts, etc. Cultural hotspots Places of intense public activity, attracting locals as well as tourists due to the identity of the place, or historic, cultural or any other significance. Cultural Precincts A concentration of fragmented and non-contiguous heritage sites and/or buildings of socio-cultural importance within an area, connected to each other by streets or street networks to form a cohesive cultural hotspot. Cultural Resource Management Plan (CRMP) It is a plan to be prepared for each cultural precinct, incorporating urban design and built form controls. Dedicated cycling corridors identified and developed with all necessary infrastructure to facilitate long distance active travel. D Developer Entity (DE) An individual land/property owner or a group of land/property owners who have pooled one or more parcels of land for taking up development/ regeneration. E Eco-cultural assets Features where both ecological and cultural aspects of a landscape are combined together, such as protected monuments and heritage buildings with open greens, gardens, constructed water systems like tanks, stepwells (baolis) etc. Economy Routes Dedicated high frequency low-fare mass transit routes in the city. Encumbrance Any legal or physical impediment that can adversely impact the transferability of the property and restrict its free use until the encumbrance is removed. Evacuation spaces Open to sky areas where people can gather at the time of an event such as fire, earthquake etc. These can be parks, multi-purpose grounds, other open spaces etc. that are easily accessible by residents.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 754 Economically Weaker Section (EWS) EWS households are defined as households having an annual income for qualifying into the Category, as may be prescribed by the Government from time to time. Express Routes Route connecting high footfall mass transit stations/destinations such that the number of stops /halt stations during the journey are minimized and the travel time is optimized. Refer MOB2, clause 4.4 External Development Charges (EDC) The charges to be paid by DE/Consortium towards the cost of constructing, laying and installing the trunk public infrastructure and services, including inter-alia roads, water supply, sewerage and drainage systems, electricity supply, greens etc. F First mile connectivity First mile connectivity refers to getting people from origin of a trip to any public transportation hub like a railway station, bus stand/depot or metro station etc. Flood Detention Sinks/retention sinks Storm water management practice used to retain/store flood water. Detention sinks can be used to attenuate and treat surface water runoff from roads or other impermeable surfaces. They are designed for areas in which storm runoff needs to be contained for a period of time to allow solids to settle and for downstream peak flow to be reduced. G Green assets Ecological features like forests, orchards, riverside development, planned parks, trees and landscaped areas, recreational greens, green belts, gardens and green roofs in built fabric, etc. Green-Blue Factor (GBF) It is a factor used for calculating a combination various green - blue features at the plot level i.e. roof gardens, terrace gardens on intermediate floors, green walls, landscaped and/ or pervious ground areas etc.). . Green-Blue Infrastructure The interconnected network of multi-scalar and multi-functional Green and Blue Assets that may be natural or form a part of designed landscapes/urban design. The concept refers to urban planning where water bodies and land are interdependent, and grow with the help of each other while offering environmental and social benefits Green building A building that, in its design, construction and operation, reduces or eliminates negative impacts, and create positive impacts, on the climate and natural environment and preserves natural resources. Green campus A campus designed with low carbon footprint and net zero energy. Such sites have very high proportion of greens and open spaces while employing sustainable and eco-friendly practices at all stages of the building’s lifecycle. Green cess Tariff levied by the development authority and local bodies, creating as a separate Green Fund used for promoting various environment-related works and interventions in the city.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 755 Green corridors Continuous green and open space existing / proposed along natural drains, water bodies that may include scrub lands, buffers, floodplains, to create a city-wide network of green-blue assets Green cover The total area under vegetation across the city that includes publicly accessible and publicly managed green space, non-accessible green spaces, privately owned vegetated land (including farmland, private gardens) and the area of vegetated cover on buildings (green roofs, terrace gardens, etc.) Green Development Area (GDA) Area earmarked for development characterized by low density and low building foot print with large wooded and landscaped areas as per the Green Development Area Policy. Economies that allow reduced carbon emissions and pollution, enhanced energy and resource efficiency, and prevention of the loss of biodiversity and ecosystem services. Examples include urban farming, horticulture, solar farms, theme parks, etc. Greenfield area The new areas available for development of urban uses within a city, typically on large vacant lands for new development. Green fuel Green fuel or bio fuel is a hydrocarbon that is made by or from a living organism that can be used to generate energy. Green fund A fund dedicated for activities/initiative pertaining to protection and enhancement of green-blue assets. Greenways Greenways are multifunctional linear landscapes that provide a range of socio-ecological benefits. When created along natural drains and rivers, these offer great potential to be developed as city level dedicated corridors for pedestrians and cyclists. Such greenways can serve the twin functions as safe spaces for leisurely walking, family picnics, cycling etc. as well as provide connection to a Strategic Active Corridors in the vicinity. Gross Residential Use A Residential neighborhood consisting of parks, Local shopping centre, schools, dispensary, religious building, utilities and other facilities required for the population at the local level. H Heritage assets Heritage Assets includes both tangible (movable and immovable heritage properties such as paintings, sculptures, manuscripts etc and monuments, heritage buildings, sites, places, streets, areas, gardens, landscapes etc.) and intangible elements (practices, knowledge, skills, living expressions and traditions such as festivals, art forms & folk culture, cuisine, dance & drama etc.) of heritage value. Heritage building Any iconic / histrocally important building identified, listed and notified by concerned agency and urban local bodies. Currently, there are 1459 notified heritage buildings within Delhi. Heritage TDR Compensation awarded in the form of FAR to the land / property owner for reduction/loss of development rights against his land due to protection of a heritage[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 756 building / site. Heritage precincts It is an area identified by concerned agency that requires conservation and/or preservation for historical and/ or architectural and/or aesthetic and/or cultural and/or environmental and/or ecological purpose. A large contiguous area of historic importance with characteristics such as unique built fabric, concentration of tangible and intangible heritage assets, associated with a particular dynasty / era or architectural style etc. Household industries (HHI) A non polluting, non-obnoxious industrial unit allowed in all residential areas (except the ‘No Industrial Activity Zones’) with certain conditions. I Influence Zone Plan (IZP) An integrated plan prepared for the delineated TOD Planning Area of a TOD Node, that includes various area improvement works such as road widening, upgrading public streets multi-utility zones, and facilities for IPT, pedestrian and NMT, multi-modal integration, provision of public parking, urban furniture, signage, public conveniences, street vending zones etc. Integrated GDA Plan (IGP) A broad structure plan for the identified area in Green Development Area (GDA). Interactive zone Specific areas and trails identified within natural and heritage assets, where full or regulated public access may be permitted with provision of adequate amenities (toilets, drinking water fountains, resting places, visitor information centres etc.) for the purpose of recreation. Intermediate Public Transport (IPT) Intermediate Public Transports (IPTs) comprise of on-demand modes of transport (taxis, auto-rickshaws etc.) with no fixed route. K Knowledge Based Industry/ cyber economies Industry that is based on intensive use of technology and measures of research and development and knowledge inputs. For example, firms involved in pharmaceuticals, health biotech, telecommunications, information technology, software, avionics, cyber economies, high-tech robotics and electronics, knowledge and innovation, research and development, etc. L Land Pooling The legal consolidation of land parcels for utilization as per Land Policy and the Regulations for Operationalization of Land Pooling Policy. Last mile connectivity It refers to the trip from origin to transit system or transit system to destination such as people going from a transportation hub like a railway station, bus depot or metro station to their final destination or vice - versa. Low-carbon technology It is a method to reduce greenhouse gas emissions and to prevent global warming. Low-carbon technology generalizes all the means and methods for low-carbon or carbon-free. It suits the need of adapting to a low-carbon economy,[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 757 M Mandatory Wooded Area The natural tree covered area (including natural unlined water bodies) to be maintained as part of Green Development Schemes. The trees shall have a canopy density of 70% or more and shall be of species that require less water and/or are effective for pollution control as recommended by the Competent Authority Master Regeneration Plan It is a plan to be prepared by the various agencies for the large existing developed areas in order to enhance the present circulation network and create smaller pockets/blocks for undertaking regeneration. Micro-mobility Green-mobility options that promote active travel such as battery-operated cycles, e-bikes etc. Minimum Waste Locality (MWL) Locality (residential area, housing society, colony, apartment, market etc.) where all the wet municipal solid waste is managed within its boundaries through eco-friendly solutions such as composting and bio- methanation etc. Miyawaki forest A dense, multilayered urban forest created by an afforestation technique that involves planting numerous native species in the given area. It can play a major role in ecosystem restoration, controlling pollution, mitigating urban heat island effects and supporting local wildlife. Multi-facility plots A plot where various local facilities are proposed to be developed in a composite manor in one or more building within the same plot. Multi-Modal Integration (MMI) Integration of rail and road-based systems which may include metro, rail/ rapid rail, bus/ BRTS and intermediate public transport (IPT) including feeder services, taxis, auto- rickshaws and private modes including non-motorised transport (NMT) such as cycle- rickshaws, bicycle, pedestrian, etc. Multi-Modal Transport Hub (MMTH) A transit node having multiple modes located at one place such as railway stations, ISBTs, RRTS stations and metro stations etc. Multi-Utility Zone (MUZ) An element on urban streets as a dedicated space between footpath/cycle track and motor vehicle lane, having space provisions for any or all of the following functions within them: tree plantation, auto/cycle- rickshaw stands, hawker zones, parking, street furniture, bus stops, public toilets, information kiosks, traffic police booths and underground and overhead utility services like electricity, water, fire hydrants, telephone, gas etc. N Natural assets Natural ecological features like forests, ridge, river, streams, drains, lakes, ponds and wetlands, etc. wetlands, etc. Nightlife circuits[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 758 Public space networks promoting an active night life by improving safety, reducing congestion by staggering activities, utilising spaces for different activities optimally, and improving productivity for formal as well as informal economic activities and creating night economies. Night shelter A premise having the facility for providing night accommodation to individuals without any charges or with token charges. It may be run by local government or voluntary agencies. Night Time Economy (NTE) Various economic activities providing alternative time and space for continuing work and production in the city and the areas that remain open for cultural activity and entertainment to attract tourists and locals at night time. NMV / Cycle Track A reserved space for movement of non-motorized vehicles like cycle, cycle rickshaws and hand pull carts. Non-motorized transport (NMT) Active transport that includes walking, cycling and other forms of mobility that are powered by humans (cycle-rickshaws, handcarts etc.). O On-street parking Authorized parking that takes place within public Rights of Way (RoW). Off-street parking Authorized parking that takes place in a built structure (underground, at ground level or above ground level) or may be out in the open as surface parking. It is entered via a driveway (making barrier-based payment systems feasible). P Parking Management Area (PMA) An area delineated to parking related interventions such as managing demand, increasing supply, regulating available parking and reducing parking related externalities. Parking Management Area Plan (PMAP) Plans prepared for designated Parking Management Area (PMAs) including specifics of parking management, use of existing parking spaces, parking charges, congestion pricing, ITS application, and enforcement of the plan. Play streets Low-volume, local streets temporarily closed to traffic for a specific duration for the purpose of play and recreation. Privately-owned public spaces (POPS) Spaces that are private property and are maintained by the owner/developer, but provide open public access during regulated hours at ground or elevated levels within buildings. Private parking Parking which is reserved for specific groups of users, such as residents or tenants. Public art[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 759 Site specific artwork created to enhance and animate publicly accessible spaces through artistic interpretations that range from individual sculpture to integrated architectural and landscape features and treatments. Public Plazas: Plazas ranging from neighbourhood chowks and nukkads to institutional forecourts, city squares and piazzas, and forming important pause points along movement networks. Public realm An essential urban common, comprised of shared public areas in a city that belong to everyone and are accessible to all such as streets, public and private plazas, parks and open spaces, etc. Public space An area or place that is open and accessible to all people, regardless of gender, ethnicity, age or socio- economic level. These include public gathering spaces (plazas, squares, parks) as well as connecting spaces (streets, subways). The a number of public spaces of cultural, social and economic significance are added in the form of activity nodes and networks adding to a vibrant public life . Public waterfronts Public spaces designed alongside water bodies in areas that were previously neglected, such as the Yamuna floodplains, buffers of drains and water bodies etc. Public Transport Accessibility Level (PTAL) A detailed and accurate measure of the accessibility of an area to the public transport network (including all public transport modes, IPTs, etc.), taking into account walk access time and service availability. Public parking Parking which is open to the general public for casual short term parking use. R Regeneration A flexible framework that allows the option of using a mix of instruments for development of an area, namely, retrofitting, reconstruction or full/partial redevelopment, provided requirements of , sustainable services, structural safety and improved walkability are met. Refuge spots Any spaces within neighbourhood identified by RWAs/ local bodies to provide alternate locations for healthy/unwell residents at the time of contagious disease outbreaks. Such spots may be in the community centre, multi-facility centre or any other publicly accessible facility. Rental housing Residential properties having number of DU’s and/ or dormitory, exclusively available for rent to the prospective tenant through a formal mechanism like agreement or any such undertaking Retrofitting The addition of new technology or features to an existing structure to reduce or eliminate the possibility of damage to that structure from flooding, erosion, high winds, earthquakes, or other hazards. Right of Way (RoW)[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 760 A reserved space for movement of all modes of traffic which includes pedestrian, cycles, cycle rickshaws, buses, cars, scooter, taxis, autorickshaws, etc. Space for services, underground/ overground utilities, public conveniences and amenities, vendors drinking water kiosks, etc, is planned and reserved within the ROW, without encroaching on walking space or motor vehicle movement space. S Sector An area delineated in the Zonal Development Plan (ZDP) bounded by existing or proposed roads or physical features such as high tensions lines, railway lines, drains etc. having an area of hec . Service markets An area or market having shops for fruits and vegetables, service and repair, junk and scrap materials (kabari), hardware and building materials, automobile repair workshops, etc. Refer ECO1, clause 3.6 Service Providing Agency An agency responsible for providing services such as water supply, sewerage disposal, electricity supply, construction of roads, communication and other distributive services etc . Single Window System An ease of doing business measure developed as a single online platform for receiving applications, verifications, approvals, grievances etc., to manage the implementation of a particular policy/ scheme in a time bound manner Shared mobility Shared mobility refers to all modes of transport that are not privately-owned. Most of these modes have fixed-route and fixed-price and fixed-schedule (such as buses, metros, etc.). It also includes all demand- based modes that provide first- and last-mile connectivity (shared autos, rickshaws, cabs, etc.) Small format housing Housing units with size ranging from 40 - 60 sq.m. Solar Farms Solar farms or solar fields are large scale solar installations where photovoltaic panels (solar panels) are used to harvest the sun’s energy. . Special abilities parks Parks designed for play and recreational activities of users (especially elderly, toddlers and infants with caregivers) with disabilities and special needs. Special Area An area with special characteristics designated as such in the Plan for development / redevelopment. Strategic Active Travel Corridors Certain identified routes with existing or anticipated high share of cyclists and pedestrians and connecting different activity centers. T Tactical urbanism Tactical Urbanism or pop-up urbanism is a measure for temporarily retrofitting a street section to priorities pedestrian and NMT movement by reserving lanes, pedestrianizing street[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 761 stretches, etc. 1 Transit-Oriented Development (TOD) A compact development around a high-capacity transit node with high density, mixed use and design oriented towards walkable and cycleable neighborhood, by maximizing land potential. TOD Nodes A mass transit station selected & notified for intense development notified by DDA. The provisions of TOD (Transit Oriented Development) Policy shall only be applicable in the Influence Zones of such identified TOD Nodes. TOD Planning Area An area of 500 to 800 m radius around transit stations . TOD Scheme A development proposal for an area falling within TOD node and fulfilling all eligibility criteria as specified in the TOD Policy. Transit hotspots Transit nodes developed as hubs of mix use and public activity. Tree directory A database of the tree species in a particular area, with identified unique trees/ tree clusters like tree corridors or precincts, heritage trees, precincts with high carbon storage and sequestration rates, etc., U Unauthorized colonies (UCs) Colonies/ comprising of contiguous area, developed without considering planning principles and approval of layout plans , building plan from concerned agencies . Urban farming The practice of growing, processing, and distributing food and other products through plant cultivation or animal husbandry, aquaculture and urban beekeeping in and around cities for local population needs. Urban Woodlands Areas within protected forests that are developedto provide people access to a variety of flora, fauna and natural environment. Use Premises A Specific plot or one of the many sub divisions of a Use Zone, designated in an approved layout plan, for a specific Use. Land use of a premise has to be determined on the basis of the Master Plan . Use Zone An area for any one of the Specified Use Category of the urban functions as provided in the Master Plan. V Vertical mixing of uses Provisioning of mixing of identified use premises in restricted conditions vertically in a plot. W[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 762 Walkability Walkability is a measure of the extent to which an area is walkable according to various features of the built environment (barrier free, safe, well-lit, comfortable etc.) and Ped- Shed of the area under consideration. Walk Plan A plan prepared for stretches of at least 400-500m (5-10 minutes walking distance) around any specific destination node with provision of pedestrian and cycling infrastructure. Actual delineation of area under a Walk Plan shall be based on ped- sheds and/or desire lines. Water Sensitive Urban Design (WSUD) An approach which integrates urban planning with the management, protection and conservation of the urban water cycle (including water supply, wastewater, stormwater and groundwater management) such that the urban water management is sensitive to natural hydrological and ecological processes. Worker housing Worker housing means property used temporarily or seasonally for the residential use of a person who is employed to do any highly skilled, skilled, semi-skilled or unskilled, manual, technical or clerical work, but does not include any such person who is employed mainly in a managerial or supervisory or administrative capacity. This housing may either be on- or off-site, and may consist of either dwelling unit or dormitory typology. Worker housing sites shall consist of adequate water supply and sanitation facilities and other amenities like emergency medical aid, creche, etc. Z Z-farming Z-farming or zero-acreage farming is a form of agriculture where separate land is not required for such activity. It utilizes otherwise unused, non-conventional spaces like rooftops, indoors, vertical spaces within buildings, etc. Zonal Development Plan A plan for one of the zones (divisions) of the National Capital Territory of Delhi containing detailed information regarding provision of social infrastructure, parks and open spaces, circulation system, etc. The draft text document of MPD-2041 and Land Use Plan shall be available at the Reception Desk of Vikas Minar, I.P. Estate, new Delhi-110002 on all working days during the period referred above. The same shall also be available on the following link i.e. https://dda.org.in/hotlinks.aspx. [F. No. 18(15)2021-MP] D. SARKAR, Dommissioner-cum Secy. Annexures Annexure 1: Prohibited / Negative List of Industries Industries manufacturing the following shall be prohibited within National Capital Territory of Delhi. 2[However, Environment Department, GNCTD in consultation with Industries department, GNCTD shall take the final decisions to ascertain a particular activity/Industry/ factory to fall under the said list as per the parameters/ norms set by the CPCB and adopted by the DPCC.] 1. Arc / Induction Furnace 2. Acids 3. Alkalis[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 763 4. Animal & fish oils 5. Aldehydes 6. Acid slurry 7. Acetylides, phridines, iodoform, chloroform, E-nepthol, etc. 8. Ammonium sulphoajanide, arsenic and its compounds, barium carbonate, barium cyanide, barium ethylesulphate, barium acetate cinnabar, copper sulphocyanide, ferrocyanide, hydro cyanide, hydro cyanic acid, potassium biocalate, potassium, cyanide, prussiate of potash, phynigallc acid, silver cyanide 9. Aircraft building. 10. Abattoirs, animal blood processing (except existing, relocation 1{and modern abattoir with latest technology shall be permitted subject to all clearances from the concerned agencies and compliance with the National Green Tribunal’s Orders in this regard). These will be dependent strictly on the need of the NCT of Delhi to be determined by the concerned local body/ authority.} 11. Bitumen blowing (hot) 12. Brick kiln (using fresh earth as raw material, coal as fuel) 13. B-nepthol 14. Bakelite powder (starting from formaldehyde) 15. Barely malt and extract 16. Bone-grist, bone-meal, salting of bones, storages of bones in open, bone drying 17. Bone charcoal manufacturing 18. Blast furnaces - coal fired 19. Bicycles (integrated plant) 20. Brewery and potable spirits 2{(However, microbreweries upto 500 L/day capacity may be allowed to be set up at any Restaurant / Hotel /Club subject to installation of on- site waste water treatment facility and compliance to all other regulatory requirements)} 21. Chlorinated paraffin wax purification 22. Carbon black 23. Cement industry 24. Calcium carbide, phosphorous, aluminum dust paste and powder, copper, zinc, etc. (electrothermal industries) 25. Cranes, hoists and lifts (excluding assembly) 26. General industrial machinery (such as hydraulic equipments, drilling equipments, boilers, etc.) 27. DOP (Dioctyl Phthalate), DBP & Plasticizer 28. Dry cell battery 29. Dye & dye intermediates 30. Distillation of wood, chemical seasoning of wood (excluding natural seasoning) 31. Explosives, i.e., Fireworks, Gunpowder, Guncotton, etc. 32. Earth moving machinery / equipment (manufacturing of assembly) 33. Electric wires and cables (more than 100 workers, 2000 sqm plot) 34. Fatty acids 35. Fungicides & pesticides 36. Flexographic ink 37. Fuel oils, illuminating oils and other oils such as stchetic oil, shoal oil, lubricants 38. 1[Foundries (Cupola Furnace)*] 39. Gas compressors 40. Graphite production 41. Glass furnace (more than 1 ton / day capacity) 42. Gases-carbon-disulphide, ultramarine blue, chlorine, hydrogen, sulphur dioxide, acetylene, etc. (other than LPG / CNG / Oxygen / medical gases) 43. Glandular / glandes extraction[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 764 44. Glue and gelatine from bones and flesh 45. Hot mix plant (except those approved by DPCC / CPCB) 46. Hazardous waste processing viz. hospital/ 2[tertiary health care centre/] medical/industrial waste. 3[(However, modern hazardous waste processing plant with latest technology shall be permitted subject to all clearances, including environmental clearances, from concerned agencies and compliance with the National Green Tribunal’s orders in this regard. These will be dependent strictly on the need of the NCT of Delhi to be determined by local body/ authority).] 47. Polyurethene foam 48. Industrial gelatine, nitro glycerine and fulminate 49. Iron / steel metal forging (using pneumatic hammer). 50. Industrial gelatine, nitro glycerine and fulminate 51. Industrial trucks, trailers, etc. 52. Linear alkyd benzene 53. Lead manufacturing including secondary lead industry (recovery of lead from waste scrap) 54. Lime kiln. 55. Leather tanning and dyeing (raw hides/skins to semi finish) 56. Locomotives and wagons 57. Methanol 58. Methylated spirit 59. Mechanical stone crushers & washing of coarse sand 60. Manufacturing of pulp & paper 61. Melamine resin 62. Mineral salts (which involve use of acids: CuSO4, FESO4, alum, etc.) 63. Manufacturing of diesel engines, generators except assembly 64. Motor cycles, scooters, cars, tempos, trucks, etc. 65. News print manufacturing, pulping, fresh paper making 66. Nitrogeneors and phosphatic fertilizers, except mixing of fertilizers for compounding (large scale) 67. Organic solvent, chlorinated minerals, methanol, aldehydes, methylated spirits 68. Petroleum coke processing, not as fuel 69. Potteries / refractories (using coal or furnace oil) 70. Polyethylene polymers including resins 71. Paint industry (nitro Cellulose & Alkyd resin based) 72. Plasticisers manufacturing 73. Pyridines 74. Phenol formaldehyde resin and powder 75. Porcelain product potteries (using coal of production capacity more than 2 tonne per day) 76. Rubber solution and thinner (using naptha and rubber scrap) 77. Roasting of Ore Sulphide Oxides of mixtures 78. Rayon fibre manufacturing 79. Refractories 80. Reclamation of rubber. 81. Production of tyres and tubes (devulcanisation) 82. Saccharine 83. Secondary Zine industry 84. Synthetic rubber 85. Smelting 86. Sewing machines (integrated units) except assembly 87. Sluice gates and gears 88. Stainless Steel Pickling 89. Steam engines 90. Steel pipes and tubes (continuous welded/seamless) 91. Sugar, khand sari[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 765 92. Sodium silicatc industry (more than 1 tonne/day) 93. Stone quarrying 94. Textile (more than 100 workers in all shifts, I acre of land, 100 LKD of water) 95. Thorium, radium and similar isotopes and recovery of rare earth 96. Turbines 97. Urea & Phenyl Formaldehyde resin 98. Vegetable oil hydrogenerated 99. Waste (crude / burnt) oil processing (refinery) Notes: i. A public utility service involving any of the activities referred to above shall be permitted subject to environmental laws. ii. Further additions / alterations to the list of Prohibited Industries could be made if considered appropriate and in public interest by the Central Government to do so. iii. However, continuity of any type of furnace shall be within set parameters of CPCB & DPCC. Annexure 2: Typological classification of green and blue assets Natural and Existing Green Blue Assets Land-based o Aravalli (Ridge), Regional Parks, Reserved Forest o Protected Forests o City Forests o Biodiversity Parks o Buffers of natural drains and water bodies o Archaeological Parks and Greens of historical monuments o Areas for natural protection/conservation identified by government agencies Water-based o River Yamuna and its flood plain o All natural drains in accordance with the Drainage Master Plan 2018 o Marshes and wetlands o Water Bodies (1Ha and above) including lakes o Baolis (stepwells) and Tanks (part of Delhi’s historic water system) Planned green blue assets and other recreational areas o Planned parks and open spaces of all hierarchies – regional, city, district, community, neighbourhood, housing area, tot lots, multipurpose grounds, golf courses, and playgrounds. (some large parks are part of protected forests in Delhi) o Sports centres/complexes, golf courses o Orchards, plant nurseries o Zoological park and botanical gardens Other green blue assets within the built fabric o Private gardens, courtyards, rooftop gardens, pools, internal streets etc.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 766 o Large green areas identified in Institutional /Government campuses/ o Public green spaces contributed through regeneration/TOD schemes o Surface/open parking areas, public plazas o Mandatory green areas in closed industrial estates o Mandatory green areas in LBZ o Mandatory buffers of HT lines/oil pipelines/other services o Residual space under flyovers, along water mains, along railway lines, etc. o Herbs, spice gardens, greenhouses. o Plantation on central verge of roads, tree cover along roads and streets New and potential City level Green Blue assets o Abandoned mines and quarries, power plants and land fill sites/reclaimed land o Newly developed Buffers of natural drains o Green Development Area *The list can be extended by adding any other assets identified by DDA from time to time Annexure 3: List of Planned Industrial Areas in Delhi (Extracted from MPD 2021) Industrial activity shall be conducted at the following locations in the Industrial Use Zone, as indicated in the Land Use Plan: ZONES A to H 1. NarainaIndl. Area, 2. Jhandewallan Flatted Factory, 3. Motia Khan Scheme, 4. DCM Flatted Factory Complex, 5. ShahzadaBaghIndl. Area, 6. GulabiBaghIndl. Area, 7. Rajasthan Udyog Nagar G.T. Road near Jahangirpuri, 8. SMA Co-op. Indl. Estate G.T. Road near Jahangirpuri, 9. SISI Indl. Area G.T. road near Jahangirpuri, 10. G.T. Karnal Road Indl. Area near Rana PratapBagh, 11. Hindustan Prefab Ltd., Indl. Area near Shivaji Rly Stn. (Minto Road), 12. Okhla Indl. Area Ph.I, II & III, 13. Mohan Co-op Indl. Area, 14. SISI Complex Okhla near Modi Flour Mills, 15. Najafgarh Road Indl. Area near Zakhira, 16. Kirti Nagar Indl. Area, Mayapuri Ph. I & II, 17. Udyog Nagar Rohtak Road, 18. Keshav Pur Leather Tannery Scheme (part of Service Centre) near Vikaspuri, 19. Wazirpur Industrial Area, 20. Lawrence Road Indl. Area, 21. MangolpuriIndl. Area Ph.I& II, 22. JhilmilIndl. Area, 23. Patparganj Indl. Area, 24. Friends Colony Indl. Area, 25. Narela Indl. Estate, 26. BawanaIndl. Estate, 27. KhanjhawalaIndl. Estate, 28. PVC Bazar Tikri Kalan, 29. Badli 30. Bhorgarh[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 767 a. Additional Industrial Areas will be indicated while preparing plans for Urban Extension Areas. b. The approved Work-cum-Industries Centres, Service Centres etc., where development has been undertaken in accordance with the land use / earlier Master Plans, shall continue to be industrial subject to conformity with provisions stipulated. Annexure 4: Household Industries 1. Agarbatti and similar products 2. Aluminum hanger (excluding wire drawing and anodizing). 3. Ayurvedic / Homoeopathic / Unani medicines. 4. Assembly and repair of electronic goods. 5. Assembly and repair of sewing machines. 6. Assembly of hand tools. 7. Assembly of Badminton shuttlecocks. 8. Assembly and repair of electrical gadgets, cooler/heater etc. 9. Assembly and repair of typewriter (excluding Font Casting). 10. Assembly of Bakelite Switches. 11. Assembly and repair of measuring instruments (excluding handling of Mercury and hazardous materials). 12. Atta Chakkies. 13. Batik works. 14. Block making and photo enlarging. 15. Biscuit, pappey, cakes and cookies making. 16. Button making, fixing of button and hooks. 17. Bookbinding. 18. Brushes and brooms (by hand). s 19. Calico and Textile products. 20. Cane and bamboo products. 21. Cassettes recording. 22. Clay and modeling with / without Plaster of Paris. 23. Coir and jute products. 24. Cardboard boxes. 25. Candles. 26. Copper and brass art wares. 27. Cordage, rope and twine making. 28. Carpentary. 29. Contact Lens. 30. Canvas bags and hold-alls making. 31. Candies, sweets, rasmalai etc. (when not canned). 32. Cotton / silk printing (by hand). 33. Computer repairing and cyber information Centre. 34. Computer Software. 35. Dari and carpet weaving. 36. Detergent (without bhatti). 37. Data processing. 38. Dairy products e.g. Cream, ghee, paneer, etc. 39. Dry Cleaning (excluding big workshops). 40. Desk Top Publishing. 41. Embroidery.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 768 42. Enameling Vitreous (without use of coal). 43. Framing of pictures and mirrors. 44. Fountain pens, ball pens and felt pens. 45. Gold and Silver thread, kalabattu. 46. Hosiery products (without dyeing and bleaching). 47. Hats, caps, turbans including embroideries. 48. Information Technology enabled services 49. Ink making for fountain pens. 50. Interlocking and buttoning. 51. Jewellery items. 52. Khadi and handloom. 53. Khustattis. 54. Knitting works. 55. Lace products. 56. Leather footwear. 57. Leather belts and assembly of buckles (by hand) 58. Leather and rexine made ups. 59. Milk Cream Separation. 60. Manufacture of Jute products. 61. Manufacture of Bindi. 62. Name plate making. 63. Production of following items. i. Blanco cakes ii. Brushes iii. Kulfi and confectionery. iv. Crayons. v. Jam, jellies and fruit preserves. vi. Musical instruments (including repairs). vii. Lace work and like. viii. Ornamental leather goods like purses, handbags. ix. Small electronic components. 64. Paper stationery items and book binding. 65. Pith hat, garlands of flowers and pitch. 66. P.V.C. products (maximum one moulding machine). 67. Paper machine. 68. Perfumery and cosmetics 69. Photosetting. 70. Photostat and cyclostyling. 71. Photo copying of drawings including enlargement of drawings. 72. Packaging of Shampoos. 73. Packaging of Hair Oil. 74. Preparation of Vadi, Papad etc. 75. Processing of condiments, spices, groundnuts and dal etc. 76. Pan masala. 77. Production of Sweets and Namkeens (less than one ton/day) 78. Paper Mache 79. Paper cup. Plates, files cover and letter pads (without printing). 80. Photography (developing and printing). 81. Repair of watches and clocks. 82. Rakhee making 83. Repair of domestic electrical appliances. 84. Readymade garments (without washing). 85. Repair of bicycles. 86. Repair and assembly of computer hardware.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 769 87. Repair of bags, brief cases, suitcases, except use of leather and PVC material. 88. Repairing of Water meters, stabilizer, UPS, etc. 89. Rubber Stamps. 90. Stone engraving. 91. Sports goods/Sports Nets. 92. Surgical bandage rolling and cutting. 93. Stove pipe, safety pins and aluminium buttons (by hand press). 94. Silver foil making. 95. Saree fall making. 96. Shoe laces. 97. Stamp pads. 98. Screen Printing. 99. Tailoring. 100. Thread balls and cotton fillings. 101. Toys and dolls. 102. Ties. 103. Tomato Ketchup. 104. Umbrella assembly. 105. Utensil washing powder (only mixing and packaging). 106. Velvet embroidered shoes / shawls. 107. Vermicelli and macaroni. 108. Wood carving and decorative wood wares. 109. Wool balling and lachee making. 110. Wooden / cardboard jewellery boxes (subject to no objection certificate from the department). 111. Wool knitting (with machine). 112. Zari Zardozi. Annexure 5: Household Industries permissible in Villages (Abadi) 1. Black smithy. 2. Cane and bamboo products. 3. Clay and modelling with / without Plaster of Paris. 4. Dari / Carpet / Sari weaving (except dying & bleaching). 5. Ice cream and water-cooling by Refrigeration. (without cold storage) 6. Stone engraving. 7. Village pottery Industry (without bhatti). 8. Village oil ghani. 9. Wood carving and decorative wood wares. Notes: i. Storing of chemicals listed under schedule I and/ or II of the Manufacture, Storage and import of hazardous Chemical Rules, 1989 and Public Liability Insurance Act, 1990 shall be prohibited. ii. No effluent / emissions shall be allowed to be generated by the units and these shall adhere to the noise standards as stipulated by Ministry of Environment and Forests, Government of India. Annexure 6: Indicative list of city-level circuits  Coronation Park-Shahjahanabad[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 770  Red Fort-Humayuns Tomb  PuranaQila-RashtrapathiBhavan  Humayuns Tomb-Safdarjungs Tomb  Safdarjung Tomb-Mehrauli  Tughlaqabad-Jahanpanah-Mehrauli  Mehrauli-Sultan Garhi Annexure 7: Street Design Regulations Based on the overall Mobility, Safety and Environmental Goals for the City, the following Regulations must be followed for design, execution, management and maintenance of all Roads: 1. To Promote Preferable Public Transport Use: 1A. Streets should be Retrofit for equal or higher priority for Public Transit and Pedestrians. 1B. Prohibit street parking or enforce high parking charges for private vehicles on public streets and spaces, in order to encourage use of other modes. 1C. Provide dedicated lanes for high occupancy vehicles (HOVs) and carpool during peak hours. 1D. Provide transit-oriented mixed landuse patterns and redensify city within walking distance of MRTS stops, wherever permissible. 2. For Safety of All Road Uses by Design: 2A. Limit speed by design on urban arterial roads and sub-arterial streets to 50 kmph and on collector and local streets to 30 kmph. Street design should be used as a means of limiting speed where possible aided by enforcement in the case of higher speed limit. 2B. Traffic calming of all streets with ROW of 12 m or less, through narrowing of driveway and meandering path with use of trees, islands and street furniture. Speed should be limited to 20 km/hr by design. 2C. Maximum kerb height shall not exceed 150 mm, as higher kerbs are difficult to climb for pedestrians causing them to walk on carriageways. Higher kerbs are also dangerous for speeding vehicles during off- peak hours as they may cause overturning of vehicles, accidents, etc.  Final road level should be fixed for all streets in the city. When repaving roads, previous layers must be scraped such that final road level remains the same.  Footpath level should never be more than 150 mm above adjoining carriageway level. 2D. Intermittent buffers, bollards and other physical elements should be used to protect footpaths from encroachment by motor vehicle parking. However, such elements should not form a barrier, such as continuous railings, that constrain access to pedestrians. Active enforcement is required to protect encroachment of footpaths. 2E. Corner radius of Kerb should not exceed 12 m, in order to control speeding of vehicles at blind turns and intersections, causing accidents. No slip roads or free left turns should be provided on Collector or Local Streets. In case slip roads or turning pockets are provided on Arterial roads, safe at-grade pedestrian crossings with traffic calming and signal should be provided. 2F. Multi-Utility Zone (MUZ) of minimum 1.8 m width should be provided on all Collector and Arterial Roads, to accommodate bus stops, street utilities, trees, street furniture, planting for storm water management; IPT/NMT stands, paid idle parking, etc. so that these don’t encroach upon the carriageway or safe pedestrian movement spaces. 2G. Secure parking facilities and services for cyclists/ NMT should be provided on all[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 771 Collector and Arterial Roads. 2H. Provide Accessible Public Toilets at every 500-800 M distance – preferably located close to bus stops for easy access by pedestrians and public transport users. 3. For Pedestrian Safety, Comfort and Convenience on All Streets: 3A. Pedestrians should remain at ground level with comfortable and safe access and minimum detours from the most direct path, unless there is no other alternative. 3B. A continuous unobstructed footpath on each side of all streets with ROW wider than 12m. Minimum width of footpath should be 1.8 m (with clear height 2.4 m.) in addition to space for trees/greenery/vending spaces and surface utilities. Width of footpath shall be determined based on pedestrian volume and have to be wider than 1.8 m wherever required. 3C. Frontage Zone or Dead Width: For sidewalks in shopping areas, an extra 1 m should be added to the footpath width. In residential areas, a dead width of 0.5 m may be added. 3D. On streets with ROW of 18 m or less, if pedestrian traffic is greater than 8000 per hour in both directions together, the entire ROW should be notified for pedestrianization. Streets may be consideredfor pedestrianization even if pedestrian traffic is lower than 8000 per hour depending on the potential to improve economic activity and/or safety and convenience. 3E. Elevation of footpaths over the carriageway at all times should be <150 mm and adequate cross slope for storm water runoff. The elevation should be low enough for pedestrians to step onto and off of the footpath easily. 3F. All facilities and amenities should be barrier free for universal access by all persons with reduced mobility including those with hearing and visual impairments. 3G. At least 5 safe Street-Level Crossing Opportunities per kilometer of street with 250 m being maximum spacing between two crossings. Depending on context, these crossings may be signalized and/or traffic calmed (through raising crosswalk over street level by 150 mm) to reduce vehicular speed.  Pedestrian refuge with a minimum width of 1 m at each street crossing location after crossing 7 m of one way motor vehicle carriageway or 10 m of two way motor vehicle carriageway at non signalized midblock crossings.  Pedestrian refuge width may be expanded to 1.75 m where possible to accommodate a bicycle.  Grade separated structures (foot-overbridges and pedestrian-subways) should be avoided to prevent unnecessary detours to reach destinations.  If grade-separated pedestrian crossings are unavoidable due to presence of highways in peripheral zones of urban areas, then such crossings structures should be frequent. There must be at least 4 crossing opportunities per kilometer in areas with development at edges. Every crossing should be universally accessible. 3H. Natural Surveillance or “eyes on the street” should be enabled on all roads by removing setbacks and boundary walls and building to the edge of the street ROW, wherever permitted as per norms. This would allow people from inside to look out on to the pavement, thus discouraging harassment of women on footpaths, bus-stops and public spaces.  The main building facade should face the street, located on the property line without setback or with active use within set back and transparent edge that contribute to street safety. Commercial frontages should have facades with minimum 50% transparency (untinted) to facilitate visual surveillance of streets.[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 772  In case enclosure of sites is required, transparent fencing should be used above 300 mm height from ground level.  Vending spaces should be marked in addition and adjacent to the walking path, especially along high pedestrian volume areas to activate the street and make it safe. Space to be planned for utilities including drinking water kiosks and toilets so that the walking space is enhanced but not compromised. 3I. Provide adequate low-mast Street Lighting for pedestrians and bicycles, in addition to any high-mast lighting provided for the carriageway. Approx. 20 lux level is suitable for non-shopping areas and footpaths and 25-30 lux-level is required for shopping areas, bus-stops, Metro station exits and any areas where pedestrians are expected to gather or wait. 3J. Provide Dustbins, post-boxes, signage and other public amenities at street corners for high usability. 4. For climatic comfort for all Road Users: 4A. Trees are an essential component for all streets – to provide shade to pedestrians/ cyclists and reduce solar gain.  At least 125 trees per km for streets with ROW smaller than 12 m. At least 125 trees per km per footpath on streets with ROW greater than 12 m. Spacing of trees at no place should be greater than 12 m except at intersections. 4B. High albedo (diffuse reflectivity) materials should be used for paving to reduce urban heat island effect. 4C. Built to Pavement Edge Buildings with overhangs and arcades provide good protection to pedestrians. 5. To ensure universal accessibility and amenities for all street users: 5A. All facilities and amenities should be barrier free for universal access by all persons with reduced mobility including those with hearing and visual impairments, as per Codes. 5B. Continuous barrier free pavement should be provided for ease of movement for elderly/ persons with disabilities. Pavement height of the footpath should be maintained at a constant level of 150 mm all along the ROW, for proper provision of table-tops / ramps, etc. at various locations such as entry to properties, crossings, etc. 5C. Provide at-grade crosswalks (and foot-over-bridges on highways or BRT corridors) at intervals of approx.70-250 M, aligning with location of transit stops, type of street / landuse activities and neighbouring building entries and destinations. 5D. Provide Accessible Public Toilets should be provided every 500-800 M distance, preferably located close to bus stops for easy access by pedestrians and public transport users. 6. To reduce Urban Heat Island Effect and Aid Natural Storm Water Management: 6A. Decrease impervious surfaces through permeable paving, tree planting zones, etc. to increase ground water infiltration & prevent seasonal flooding. 6B. Integrate Natural Storm Water filtration and absorption into street design through bio-filtration beds, swales and detention ponds. 6C. Decrease Heat Island Effect (HIE) by increasing greenery, planting trees, using reflective paving, etc. 7. Intermediate Public Transport: Intermediate Public Transport (IPT) are hired / shared modes of transport that may serve as feeders to trunk public transport systems or as another alternative to private transport[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 773 use. IPT includes cycle- rickshaws, auto-rickshaws, e-rickshaws, taxis and any other vehicle type serving as a shared mode / feeder service that is also prescribed under the Motor Vehicle Act. Taxis play an important role in providing an integrated transport service which should also be available on road like all other metro cities for people who choose not to use a car and combine taxi with public transport for certain trips. Auto- rickshaws also play an essential role as a shared or hired mode of public transport which provide door-to-door connectivity for a variety of trips and provide an affordable alternative to private modes. Adequate space for IPT, Bus, private bus, truck and commercial parking must be provided on all Layout Plans. 8. Definition of Mass Rapid Transit System (MRTS): Mass Rapid Transit System (MRTS) may be defined as any public transit system having the capacity to carry more than 10,000 peak hour peak direction trips (PHPDT). Annexure 8: Indicative list of Cultural Precincts  NizamuddinDargah- Humayun's Tomb Complex-Sundar Nursery  Shamshi Fort-Jahaz Mahal-Zafar Mahal-Baoli-Adam Khan Tomb- QutubMinar complex  Vijay Mandal - Begumpur - Sarai Shahji -Lal Gumbad  Safdurjung Tomb- Lodhi garden- Lodhi Institutional Area- Lodhi Art District  Trikona Park- Shahpurjat fashion street - TohfeWalaGumbad- Asiad village society  Firoz Shah tomb- HauzKhas village - HauzKhas Lake  Khirki mosque-Satpulanullah- monuments in Chirag Dilli- Jahanpanah forest  Heritage Precincts within Walled City (Heritage Zone): Historical markets (like Khari Baoli, ParatheWaliGali / Katras / Chandni Chowk vista/ area around Matia Mahal/ area around Jama Masjid  Heritage Precinct within LBZ: Central Vista Annexure 9: Industrial concentration in non-conforming areas for redevelopment Non-Conforming industries Area (Ha) Anand Parbat 49.5 Shahdara 19.7 Samai Pur Badli 20.1 Jawahar Nagar 17.9 SultanpurMazra 15.5 Hastsal Pocket – A 5.5 Naresh Park Extension 12.7 Libaspur 32.4 Peeragarhi Village 17.2 Khyala 47 Hastsal Pocket – D 6 Shalamar Village 5.1 New Mandoli 24.7 Nawada 5.3[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 774 Rithala 41.2 Swarn Park Mundka 6.9 Haiderpur 22.2 Karawal Nagar 25.5 Dabri 2.6 BasaiDarapur - Prahladpur Banger 23.4 Mundka and MundkaUdyog Nagar 80.8 Ranhola (*Notified on dt. 26th August 2019 by Industries Department, GNCTD Annexure 10: Key Performance Indicators for MPD-2041 Remarks Sl. Name of Means of measurement No the KPI . Much of the pollution in Delhi is from external sources over which the city has Number of indigenous PM2.5 observations within at least "good" category no control. Indixgenous factor 1 Reduction Total number of observations is the pollution 1 in that originates in Indigenous Where, the city that can Air  Indigenous PM2.5 = Indigenous factor X PM2.5 value be ascertained Pollution  Observations = Number of monitoring stations x 365 (for through a source daily measurements) apportionment study. Such a  Good category = corresponds to the directions provided by study shall be CPCB. carried out every 5 years. Individual scores for river, water bodies, and Measured Dissolved Oxygen in the natural body Mdinriaminusm t oD bees ired Dissolved Oxygen in the natural body x 100 calculated in the Water Where, range 1-5 as per 2 Pollutio  Natural bodies includes the river, water bodies, and natural the criteria in n drains 2.4. An average Control  Minimum Desired Dissolved Oxygen (for 1st phase of of the three monitoring) = 4 mg/L (to be revised subsequently as per CPCB scores will give directions) the overall KPI score. Green cover is defined and Annual increase in green cover of the city (%) with reference to a Green Cover calculated as per 3 baseline (e.g. Enhanceme Forest Survey of 2021 data) nt India directions. Criteria for defining a rejuvenated Rejuvenatio water body Number of rejuvenated water bodies of size 1 Ha 4 n of Water and above  No presence x 100[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 775 Bodies Total water bodies of size 1 Ha and above of solid waste in or around the water body  No discharge of untreated wastewater in the water body  Presence of a boundary protection around a water body  No visible eutrophicati on in the water body  Minimum DO of 4 mg/l  Access to general public (desirable but not mandatory).  Regular maintenance mechanism in place  No reduction in volume of water from previous year Flooding hotspots Reduction in the number of flooding hotspots with reference to a defined and Flood 5 baseline (e.g. identified by PWD Risk 2021 data) and Delhi Reductio Traffic Police n Wastewate Treated 6 wastewaterused r Reuse x 100 Total wastewater generated Groundwate “Safe“category, Number of observation wells in which the groundwater depth is in 7 r as defined by “safe” Augmentati CGWB category o n Reducing Total waste reaching 8 landfills Landfill x 100 Stress Total waste generated Convertin Increase in revenue generated from recycled C&D products with 9 g Waste to reference to a baseline (e.g. 2021 data) Wealth[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 776 Renewable Share of energy sources Renewabl Energy usage from renewable sources include solar, 10 x 100 e Energy Total energy usage wind, hydro, and in Total geothermal. Usage Buildings Number of registered buildings that are siesmically compliant requiring seismic Seismic 11 x compliancy as Complianc 10 0 per DDMA e Number of registered buildings requring siesmic compliancy directions. Safety Reduction in number of fire incidents with reference to a 12 Against Fire baseline (e.g. 2021 data) Outbreaks Share of Refer SSI1: Small Format Clause 3.2.2. Number of small format authorized DUs 13 Housing in constructed New x 100 Number of new authorized DUs constructed Housing Stock Slum Number of listed slums that are rehabilitated Listed slums as 14 x 100 Rehabilitatio per DUSIB. Total number of listed slums n Data to be ascertained Shift Ratio of total trips by public and shared modes of transport to through a city- 15 towards total trips by private modes (excluding walk wide transport Public trips) modal split Transport survey every five years. Adoption New electric vehicles 16 of Electric registered Vehicle x 100 Total new vehicles registered The methodology Human propagated by 17 Developmen Self-explanatory UNDP may be t Index used to ascertain the HDI for Delhi. Conservation criteria as Heritage Number of conserved 18 prescribed by Conservatio heritage sites x 100 Archeological n Total number of heritage Survey of India. sites Refer Annexure 6 Vibrancy of Length of roads of 18m and above 19 : Street Design Public designed as per street design Regulation Streets Regulation x 100 Total length of roads of 18m and above Female Total female workers bewteen the age 20 Participation of 15−64 in Workforce x 100 Total females between the age of 15−64 Annexure 11: List of Industries (M1)[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 777 ‐ This category will comprise businesses engaged in high technology, research and development (R&D), high value-added and knowledge intensive activities. ‐ A range or variety of activities or uses which are technology and research-oriented industries and non-manufacturing in nature are allowed in this industrial use zone; 1. Software Industry a. Computer hardware and software industry and industries doing system integration using computer hardware and software. b. Industries integrating and manipulating the interfaces of the computers and telecom facilities. c. Software products and Mobile Applications IT and IT enabled functions 2. IT Service Industry a. Internet & Email Services Provider b. World wide Web Services Provider Ecommerce & content development. c. Electronic Data Interchange (EDI) Services d. Video conferencing, V SAT, ISDN services e. Electronic/IT Data Centre activities 3. ITES Industry a. Customer interaction services, e.g, call/ contact centres and email help desks b. Back office processing c. Finance and accounting (provided remotely) d. Insurance claims processing (provided remotely) e. HR services & Other Consulting (provided remotely) f. Web site development and maintenance services g. Remote education g. Business Process Outsourcing, Knowledge Process Outsourcing h. Software Extension development i. Electronic Design & Product Development j. Engineering Design & Product Development k. Industries catering to the information needs of uses by providing databases or access to databases spread throughout the globe. l. Industries providing the facilities for sophisticated testing of different or all components of the information technology. m. Telecommunications and enabling services. 4. Media a. TV and video programme production. b. Photo composing and desktop publication. c. Publishing d. Audiovisual services 5. Biotechnology/ Medical a. R&D and manufacture of products or processes, which use or are derived by using specific living systems (plants, animals and microbes or parts thereof) and or enzymes/ biocatalysts derived there from b. Genetic Engineering & Contract Research & Clinical Trials c. Medical Transcription Services 6. Research & Development and Design a. Electronics R&D-Design & Product Development b. Engineering R&D- Design & Product Development c. Biotechnology R&D d. Design Garments Industry, Gems &Jewellery, Web Design etc e. Textile designing and fabric testing, etc. f. Inter-Disciplinary R&D Services[PART II—SEC. 3(ii)] THE GAZETTE OF INDIA : EXTRAORDINARY 778 7. Others a. Packaging b. Electronic goods, Power (Electrical) Distribution services c. Service and repair of TV and other electronic items. d. Transport services e. Food and beverage services f. Culture and creative industries g. Start ups, incubators and Accelerators Note: 1. * The minimum ROW of a street or stretch of road on which the activities mentioned in Sl. No. 7 are permissible is as follows: i. Plots upto 1000 sqm- 12 m ROW ii. Plots above 1000 sqm- 18 m ROW 2. Any recommendation for additions/ alterations to the above list forwarded by DSIIDC in consultation with Industries department of GNCTD shall be incorporated, if considered appropriate and in public interest by the Central Government. Annexure 12: List of Service & Repair Industries (M1) 1. Air Conditioner Parts. 2. Aluminium doors / windows / fittings / furniture. 3. Assembly and repair of Cycles. 4. Auto Parts. 5. Bulbs (battery). 6. Cycle Chain / Locks. 7. Diamond Cutting and Polishing work. 8. Electric fittings (switch, plug pin etc.) 9. Engineering works 10. Foundry (small job works as per prescribed limits of Industries Department / DPCC). 11. Ice-cream and water cooling by Refrigeration (without cold storage) 12. Ice boxes and cooler bodies. 13. Iron grills and door making. 14. Jute products. 15. Knife making. 16. Marble stone items. 17. Metal lathe cutting. 18. Motor winding works. 19. Steel lockers 20. Steel Springs. 21. Tin box making. 22. Transformer covers. 23. TV, Radio recorders etc. 24. TV / Radio / Transistor cabinets. 25. Typewriter parts manufacturing and assembly. 26. Water meter repairing. 27. Welding works. 28. Wire Knitting. 29. Wooden furniture works. 30. Information Technology enabled Services and computer parts Note: All these industries shall be non- hazardous and non-polluting in nature and the[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 779 standards prescribed by the pollution control authorities would have to be met by all industrial units in this category. Annexure 13: List of pre-1962 built up residential and rehabilitation colonies 1. Aliganj 29. Multan Nagar 2. Andha Mughal 30. Nanakpura 3. Balbir Nagar 31. Nicholson Marg 4. Bharat Nagar 32. New Rajinder Nagar 5. B. K. Dutt Colony 33. Old Rajinder Nagar 6. Dishad Garden 34. Outram Lines 7. Gandhi Nagar 35. Patel Nagar (E) 8. Geeta Colony 36. Patel Nagar (W) 9. GulabiBagh 37. Patel Nagar (S) 10. Inderpuri 38. Pratap Nagar 11. Jangpura - A 39. Prem Nagar 12. Jangpura - B 40. Punjabi Bagh 13. JangpuraExtn. 41. Rajouri Garden 14. Jawahar Nagar 42. Rana PratapBagh 15. Kalkaji 43. Ramesh Nagar 16. Kamla Nagar 44. Ram Nagar 17. Karol Bagh 45. Rohtasnagar 18. Kingsway Camp 46. Roop Nagar 19. Kirti Nagar 47. Sarai Rohilla 20. KishanGanj 48. Shahdara 21. Kishan Nagar 49. Shakti Nagar 22. Lajpat Nagar - I to IV 50. Sheikh Sarai 23. MalkaGanj 51. Shivaji Park 24. Malviya Nagar 52. Subhash Nagar 25. Mansarovar Garden 53. Tilak Nagar 26. Model Basti 54. Timar Pur 27. Model Town 55. Tihar - I & II 28. Moti Nagar 56. VinobaPuri 57. Vijay Nagar780 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Annexure 14: Service Plans List of Annexures ANNEXURE I: SERVICE PLAN - DELHI JAL BOARD (DJB) ANNEXURE II: SERVICE PLAN - IRRIGATION AND FLOOD CONTROL DEPARTMENT (I&FCD) ANNEXURE III: SERVICE PLAN - DELHI CANTONMENT BOARD (DCB) ANNEXURE IV: SERVICE PLAN - EAST DELHI MUNICIPAL CORPORATION (EDMC) ANNEXURE V: SERVICE PLAN - SOUTH DELHI MUNICIPAL CORPORATION (SDMC) ANNEXURE VI: SERVICE PLAN - NORTH DELHI MUNICIPAL CORPORATION (NORTH DMC) ANNEXURE VII: SERVICE PLAN - NEW DELHI MUNICIPAL COUNCIL (NDMC) ANNEXURE VIII: SERVICE PLAN - DEPARTMENT OF ENVIRONMENT, GNCTD AND DELHI POLLUTION CONTROL COMMITTEE (DPCC) ANNEXURE IX: SERVICE PLAN - DEPARTMENT OF POWER, GNCTD ANNEXURE X: SERVICE PLAN - DELHI TRANSCO LIMITED (DTL) ANNEXURE XI: SERVICE PLAN - INDRAPRASTHA GAS LIMITED (IGL) ANNEXURE XII: SERVICE PLAN - DEPARTMENT OF INFORMATION AND TECHNOLOGY, GNCTD[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 781 ANNEXURE I: SERVICE PLAN – DELHI JAL BOARD (DJB)782 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)][भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 783 PERSPECTIVE PLAN FOR INFRASTRUCTURE SERVICE FOR DELHI - 2041 AGENCY: DELHI JAL BOARD (DJB) (A) WATER SUPPLY 1. Present water demand Delhi Jal Board (DJB) had earlier considered per capita potable water requirement @ 60 GPCD. As per the projected population of 23 million for 2021, the water demand is estimated to be 1380 MGD. 2. Water demand projections for 2041 DJB anticipated that by the year 2041 about 1500 MGD potable water @ 50 GPCD (225 LPCD) for a population of 30 million (3 crore) shall be required. For future planned developments, availability of potable water will be restricted to maximum of 40 GPCD (180 LPCD). 3. Basis for adopting per capita water requirement: Due to limited water resources, demand for potable water has been rationalized by use of non-potable recycled water of desired quality standards for different non-potable uses. For future planned developments, availability of potable water will be restricted to a maximum of 40 GPCD as given in the Table - 1. Table 1 Potable Water Demand as per use for future developments Potable Water Demand Quantity Residential 135 LPCD Non-Residential (Commercial/Institutional etc. including 5 LPCD for 20 LPCD floating population) Fire Demand 2 LPCD Transmission Losses @ 15% 23 LPCD Total 180 LPCD (Say 40 GPCD)784 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Water requirement for toilet flushing purposes in residential developments and non- residential developments (about 75LPCD) shall have to be met by use of non-potable recycled water of desired quality standard with dual piping system. Water demand for industrial process water & horticulture/gardening/agriculture purposes shall also need to be necessarily met out from recycling of wastewater of desired quality standards. Necessary infrastructure for enabling use of recycled water such as dual piping and plumbing, etc. is to be ensured by DDA / Land Developing Agencies. For new buildings (land pooling / redevelopment), dual piping maybe enforced by the building plan sanctioning authorities. The plumbing infrastructure for dual piping is very difficult and cost intensive to implement in existing developments. Therefore, Delhi Jal Board has assessed that with potable water demand of 40 GPCD in future planned developments, total requirement of potable water at the city level can be progressively brought down from 60 GPCD to 50 GPCD. 4. Action Plan for Water Augmentation for 2041 It is well known that the fresh water resources for the National Capital Territory of Delhi are limited and the situation is increasingly becoming challenging. Therefore, a twin- pronged strategy for water supply in the future focuses on the augmentation of both, ground water and surface water resources, while also emphasizing the need for increased wastewater treatment and reuse, rainwater harvesting initiatives, restoration of water bodies, etc. Water Augmentation Plan for NCT of Delhi envisaged by Delhi Jal Board is given here under Table - 2: Table 2 Water Augmentation Action Plan Proposed amount of water augmentation (in MGD) Water Sources Source of water 2021- 2026- 2031- 2036- 2026 2031 2036 2041 Short to Medium term Plan (248 MGD) 1. Ground a. Installation of additional Tube-Wells in 25 Water Palla Area (200 Tube-Wells)[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 785 Extraction b. Aquifer Recharge and Ground Water (113 MGD) Extraction from Water Bodies / Lakes 23 (including reuse of treated effluent) c. Ground Water Extraction from Localized Area having High Ground Water Levels d. Additional Ground Water Recharge 65 Projects in Palla Areas e. Setting up Advanced WTPs at Okhla with Ground Water Sources from Ranny Wells 2. Surface Discharge of high quality treated effluent in Water (70 the River Yamuna at Palla and its 70 MGD) reclamation at Wazirabad as raw water source (Reuse of treated effluent) 3. HP share of Additional Yamuna water to Delhi as per unutilized the MOU with Himachal Pradesh for water in utilization of their un-utilized Yamuna river Yamuna water allocations. 65 share (Surface Water - 65 MGD) Medium to Long term Plans (336 MGD) 4. Substitution Utilization of 51 cusec of allocated of 51 cusec irrigation water to Delhi at Hathnikund / of Yamuna Tajewala for its drinking water needs Water for 16 irrigation purposes (16 MGD) 5. Raw water MOU with Uttar Pradesh for additional from Uttar river water to Delhi in lieu of adequately 140 Pradesh treated effluent by Delhi for their irrigation786 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] (140 MGD) needs 6. Upstream Upstream Storages – Renukaji, Lakhwar & Storages (180 Kishau dam projects MGD) (*This is a highly tentative calculation. However, exact allocations will be decided by UYRB where Delhi hopes that drinking 180* water requirements will be given primacy in allocations & return flow by Delhi will be considered in allocation of Yamuna water in Delhi for its consumptive needs.) Present Availability of Water 935 MGD Additional Water Augmented by 2041 584 MGD Total Water Availability by 2041 1519 MGD DDA has to earmark land required for water supply infrastructure and has to provide land to Delhi Jal Board for setting up Water Treatment Plants and Primary UGRs/Master Balancing Reservoirs with Booster Pumping Stations. JICA Study Report on Improvement of Water Supply in Delhi has suggested Master Plan Development Zones wise Primary UGRs/MBRs with pumping capacities totalling to 1560 MGD and four new Water Treatment Plants. Status of land for the proposed four new Water Treatment Plants is given in Table – 3. Table 3 Land Requirement for new WTPs Master Plan Sr. No. Name of WTP Capacity (MGD) Status of Land Development Zone 1 Iradat 80 Available with DJB P-1 2 Dwarka Phase II 50 -do- L 3 Najafgarh 75 DDA has to provide L 4 Chattarpur 80 -do- J The land requirement includes additional provision of 15% & 25% for WTPs and UGR with BPS respectively for future expansions and ancillary infrastructure.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 787 In addition, Water Treatment Plants for another 300 MGD would require to be setup for catering to the projected population of 30 million by 2041. Land for these WTPs will need to be earmarked as per norms mentioned below, depending on the source of raw water and the planned development to be carried out.  For Water Treatment Plants:  80 MGD (363 MLD) capacity – 300 m2/MLD  40 MGD (182 MLD) capacity – 400 m2/MLD  For underground Reservoirs with Booster Pumping Stations:  5 ML Capacity – 700 m2/ML  50 ML Capacity – 600 m2/ML Assessment of land requirement should not be limited by the projected population for MPD-2041, but need to consider design period i.e. population projections for 2051 and further future urban expansions. 5. Water Conservation Initiatives by DJB 5.1. Groundwater Recharge through Rain Water Harvesting: Central Ground Water Board has assessed that potential annual rainwater run-off of 24.39 MCM (5,372MG) out of the total of 175 MCM (38,546 MG) available for recharge areas in Delhi. This is proposed to be realized through construction of check dams and artificial recharge structures in rainwater drains. Annual potential of rooftop rainwater harvesting is assessed to be about 14.69 MCM (3,236MG). RWH Structures are integral to the rainwater conveyance system. DJB has also published guidelines for encouraging adoption of Rooftop Rain Water Harvesting. DJB has identified 89 buildings maintained by PWD/DMCs/GoI/DDA, etc.in 2019, where RWH system is feasible to be installed.788 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Eleven rain centers in the field and one at the Headquarter have been setup to facilitate the applicants to install rainwater-harvesting system. Nodal officers’ in-charge of these rain centers has also been appointed. Intensive awareness program for publicity of Rain Water Harvesting is also carried out from time to time. 5.2. Revival and Rejuvenation of Existing Water Bodies and Creation of Artificial Water Bodies: Traditional water bodies help sustain the city’s eco system and act as a catalyst to its growth and development, and additionally their rejuvenation contributes to the aesthetics of the city. Majority of Delhi’s traditional water bodies suffer from encroachment, illegal construction, over-extraction and water pollution. In order to address these issues, DJB has taken up the work of revival of 240 water bodies with an aim to recharge ground water. The scheme amounting to Rs. 37,678.92 lakh to revive 155 water bodies was approved by DJB in December 2018, out of which, work for 50 water bodies have already been awarded. Raw sewage is proposed to be treated and utilized to recharge ground water. DJB is also creating artificial Lakes at PappanKalan Waste Water Treatment Plant (WWTP), Dwarka WTP, Timarpur Oxidation Pond, Rohini WWTP and Nilothi WWTP. About 46.5 MGD of treated effluent will be utilized after due treatment to fill the lakes for recharge of ground water. It is estimated that about 50% i.e. 23.25 MGD of water would be available as raw water source from extraction of ground water by installation of tube- wells in the surrounding areas of these artificial lakes. Status on revival of existing water bodies and creation of new lakes is given in Table-4 &5 Revival/rejuvenation of water bodies will involve following activities:  Sewage flow into the identified water bodies will be trapped or stopped.  Treated effluent from a nearby decentralized Waste Water Treatment plants will be used for rejuvenation of dry water bodies or DJB will install bioremediation Waste Water Treatment Plants to clean waste water coming into the water bodies.  The surrounding of water bodies will be developed and people residing near-by will be given access to the water bodies.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 789 Table 4 Status of Works on Existing Water Bodies No. of Water Awarded / S. Status of Water Bodies / Artificial Estimated Timelines No. Bodies/Artificial Lake Lakes Cost(Lakh) 1 In progress 46 7942.05 Works will be progressively Proposal under completed in 2 Preparation for call of 39 10639.22 phased manner tenders in next 3 to 4 To be executed by M/S 3 4 1348.25 years. CSIR-NEERI as PMC Proposed to be carried out through in-house 4 66 17749.40 technology on DBO basis Water Bodies received from IFCD, Proposed to 5 be carried out through 85 22859.08 in-house technology on DBO basis Total 240 60538.00 Table 5 Status of New Artificial Lakes to be created Estimated Quantity Quantity of available for Treated Status of Artificial use as Raw S. No. Effluent to be Status Timelines Lakes Water Source Utilized from Extraction (MGD) of Ground Water (MGD) 1 At DWARKA WTP In Works will 15 7.5 Progress be progressively 2 At Sector -25 Rohini 5.5 2.75 In790 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] WWTP Progress completed in phased 3 At Timarpur In 6 3 manner in Oxidation Ponds Progress next 3 to 4 4 At Nilothi WWTP Proposal 15 7.5 years. revised 5 At Pappankalan In 5 2.5 WWTP Progress 5.3. Utilization of Treated Wastewater: Present utilization of treated effluent in NCT of Delhi is about 90MGD, apart from the discharge of 267 MGD of treated effluent as return flow in the river Yamuna downstream of Wazirabad Barrage as per the present interim distribution of Yamuna water by UYRB. Further, proposed utilization of Treated Effluent to the extent of about 436-466 MGD is given in Table-6 as under, which will be undertaken in a phased manner. Table 6 Proposed Utilization of Treated Effluent Sr. Proposed Quantity Timelines Remarks No. Utilization (MGD) 1 Coronation 70-100 Dec-2023 To be used as source of Raw Pillar STP Water after tertiary treatment. This proposal has been agreed in principle by UYRB. The tenders for consultant have been received on 07.01.2021 and likely to be awarded by Feb, 2021. 2 Auchandi & 20 Jun-2023 Exchange with Haryana in Jaunti lieu of irrigation component. Regulator for This proposal is being irrigation use in considered by UYRB and joint NCT of Delhi inspection with UYRB was done on 08.01.2021. 3 Exchange in 140 (3-4 years after Exchange of raw water in lieu lieu of raw MOU with UP) of Treated Effluent from water with U.P 2024-25 Okhla STP. Matter is being[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 791 pursued with U.P Govt. The feasibility report submitted by UP irrigation, under examination. 3 Committed use 18 At present about Committed use by PPCL at by PPCL 7 MGD is being Rithala. taken by PPCL at their Bawana plant however, keeping in view their future expansion plans a provision of additional 18 MGD is kept for their committed use. 4 All water 188 Dec-2024 bodies, forests etc. Total 436 -466 WAPCOS (India) Limited, a Government of India Undertaking, has submitted its report with identified proposed Recharge Schemes/Projects in NCT of Delhi such as Check damns/Nala bunds in Ridge area, Roof-top rainwater harvesting schemes in institutional and commercial buildings, percolation ponds, lake basins, aquifer storage and recovery wells, parks and gardens recharge regions, flyovers and city roads, Yamuna flood basin areas, etc. to be carried out by respective agencies. 6. Efforts for Service Level Improvements by DJB Delhi Jal Board has taken numbers of steps to improve sanction of water and sewer connections in a time bound manner and to increase billing and revenue collection efficiency such as implementing Revenue Management System (RMS), mobile application for self-billing and online payments, doorstep delivery of public services, time bound792 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] grievance redressal, simplification of procedure of sanctioning of new water/sewer connection, strict actions against wastage of water, etc. DJB endeavour is to provide equitable distribution of water to the citizens of Delhi and to meet their 24x7 demand of potable water continuously at adequate pressure. For this, Delhi Jal Board is revamping water supply distribution infrastructure including formation of District Metered Areas for reducing non-revenue water and minimizing physical loss of precious potable water through leakages. Installation of bulk flow meters for water auditing, replacement of old/damaged water pipelines, District Metered Areas (DMAs), reforms on revamping water distribution infrastructure under existing Chandrawal and Wazirabad WTPs, installation of SCADA systems at WTPs, UGRs and in water distribution systems, etc. are few of the DJB initiatives in this direction. Several steps are being taken to overcome frequent Ammonia pollution in river Yamuna by DJB. Delhi Jal Board also has setup Quality Control Cell to check quality of raw water and treated water. (B) WASTEWATER / SEWERAGE 1. Wastewater Projections for 2041 Estimated wastewater generation for a population of 30 million (water supplied @50 GPCD) at 80% of supplied water comes out to be 1200 MGD. 2. Perspective Sewage Disposal Plan for 2041 Perspective Sewerage Disposal Plan for 2041 comprises of a multi-dimensional approach with various crucial verticals like laying of sewerage system in unsewered areas of Delhi, rehabilitation of existing STPs, construction of new STPs or at mouth of the Drains, construction of Decentralized STPs in various parts of Delhi, up-gradation of existing STPs to higher parameters of BOD: TSS <10:10 and Zero Liquid Waste Discharge (ZLWD) policy in Land Pooling Area etc. The sewerage development plan for 2041 draws heavily from the SMP- 2031 and is a continuation of the sewerage management action plan being undertaken by DJB. Therefore, with suitable need based modifications depending on the actual growth patterns and spatial distribution, the Sewerage Master Plan -2031 prepared by DJB, will be able to fulfil the requirement of MPD-2041.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 793 Based on various physical factors and zoning criteria, the whole NCT of Delhi has now been delineated into 12 (twelve) sewage-drainage zones, instead of six zones earlier, excluding the Cantonment and Airport areas. The zones have been primarily delineated based on the wastewater generation from each zone/sub zone, the capacity of existing WWTPs/WWPSs and land availability for any additional WWTP/WWPS, if required. Sewerage Schemes for each Zone are prepared considering the existing sewerage infrastructure, proposed sewerage infrastructure under various projects, development plans for a particular area, population projections, amount of waste water generation, land availability for proposed sewerage infrastructure and site feasibility. The following table enlists the proposed delineated zones and sub zones: S. No. Drainage Zone Sub Drainage Zone Yamuna Vihar (YV) Zone 1 Shahdara (SHD) Sonia Vihar (SV) Kondli (KN) Okhla (OK) Zone 2 Okhla (OKH) Tajpur (TP) Zone 3 Keshopur (KSP) Keshopur (KP) Rithala (RT) Zone 4 Rohini-Rithala (RR) Rohini (RH) Coronation Pillar (CP-1) Zone 5 CORONATION PILLAR (COR) Coronation Pillar (CP-2) Dwarka (DK-1) Zone 6 DWARKA (DWK) Dwarka (DK-2) Najafgarh (NJ) Jhuljhuli (JH) Zone 7 NAJAFGARH (NJF) Dhichaon Kalan (DK) Somesh Vihar (SV) Zone 8 NILOTHI (NLT) Nilothi (NT-1)794 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Nilothi (NT-2) Narela (NR) Zone 9 NARELA (NRL) Palla (PL) Zindpur (ZP) Mahrauli (MH) Vasantkunj (VK) Zone 10 SOUTH DELHI (SD) Ghitorni (GH) Mahipalpur (MP) Kapashera (KH) Fatehpurberi and Chandanhola (FC) Zone 11 OUTER SOUTH DELHI (OSD) Rajpur Khurd (RK) Kanjhawala (KJ) Zone 12 KANJHAWALA-BAWANA (KB) Bawana (BW) 3. Sewage Treatment Augmentation Action Plan for 2041: Detailed Perspective Plan for augmentation of sewage treatment capacity to cater to the projected requirements of year 2041 is as under: S. No. Particulars Total (MGD) 1. Present sewage treatment capacity 597 STPs under up gradation / reconstruction through funding from 2. NMCG, YAP-III and AMRUT (Okhla -30 MGD, Kondli-20 MGD, 110 Coronation-40, Rithala-20 MGD) 3. Construction of 56 DSTPs in various parts of Delhi 92 Construction of STPs at Mouth of the Drain (10 MGD Mori 4. 40 gate, 10 MGD Delhi Gate, 20 MGD Barapulla) Construction of 7 MGD STP at Sonia Vihar and 25 MGD STP 5. 32 at Rohini Augmentation of treatment capacity through PAC (Poly 6. 89 Aluminum Chloride) extended aeration and construction of[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 795 DSTP based on growth the population in the developing area. Land Pool area proposed to be designed on Zero Liquid Discharge basis. Therefore, DSTPs are to be constructed by 7. 240 Land Pooling agencies for 75 lacs population having water supply @ 40 GPCD @ of 80% Water supply. Grand Total 1200 MGD 3.1. Augmentation of Sewage Treatment Capacity to 707 MGD by December – 2022 as per following: Total Sewage Present Net S. Name of Treatment capacity capacity Increase Augmentation Plan No. STP After augmentation (in MGD) (in MGD) (in MGD) Coronatio Construction of new 1 30 70 40 n Pillar STP of 70 MGD Rehabilitation of Rithala 2 20 40 20 Rithala STP phase-I phase-I under YAP-III Rehabilitation of 3 Kondli 70 90 20 Kondli STP under YAP-III Construction of new 4 Okhla 140 170 30 STP of 170 MGD under YAP-III Total 260 370 110 Enhancement of Treatment 110 MGD by December 2022 3.2. Upgradation of Existing STPs to BOD: TSS<10:10: 6 STPs (Pappankalan, Nilothi, Kapashera, CWG Village, Delhi Gate & Chilla) with total 70 MGD presently at 10:10. Upgradation Work in progress in 10 STPS with 289 MGD capacity- targeted completion by Dec-2022 in phased manner.796 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] S.No Location Capacity Targeted completion 1 Kondli STP Phase I 10 MGD December 2021 2. Kondli STP Phase II 25 MGD December 2022 3. Kondli STP Phase III 10 MGD December 2021 4. Yamuna Vihar STP 10 MGD December 2022 Phase II 5. Okhla STP Phase I 30 MGD In place of these four STPs, a New STP of 124 MGD capacity is under construction which is targeted to be completed by December 2022 6. Okhla STP Phase II 12 MGD 7. Okhla STP Phase III 37 MGD 8. Okhla STP Phase IV 45 MGD 9. Rithala Phase-I 40 MGD December 2022 subject to grant of tree cutting permission from Forest department. 10. Coronation Pillar 70 MGD In place of existing Coronation Pillar Phase-I,II& III (30 MGD) , new 70 MGD STP at Coronation is under construction which is likely to be commissioned; 50% by March, 2021 100% by June 2021. Total 289 MGD 3.3. Up-gradation of balance Existing STPs with Parameters of BOD/TSS as 10/10 mg/l (including Bio-nutrient & pathogen removal & sludge management): Designed Design Expected S. Phase- Wise outlet Name of STP Capacity (in timelines of No. Breakup Parameters MGD) completion BOD/TSS 1 Rithala Phase - II 40 15/20 The completion 2 Okhla Phase-V 16 30/50[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 797 Phase-VI 30 20/30 period for up- 3 Kondli Phase - IV 45 20/30 gradation of 4 Keshopur Phase-I 12 20/30 STPs is 3 to Phase-II 20 30/50 4 years from the Phase-III 40 30/50 date of 5 Yamuna Vihar Phase – I 10 30/50 availability Phase-III 25 20/30 of funds. 6 Vasant Kunj Phase – I 2 30/50 Phase - II 3 30/50 7 Mehrauli Mehrauli 5 20/30 8 Narela Narela 10 30/50 9 Nilothi Phase – I 40 30/50 10 Najafgarh Najafgarh 5 30/50 11 Pappankalan Phase – I 20 30/50 12 Dr. Sen Nursing Dr. Sen 2.2 10/15 Home Nalla Nursing Home Nalla 13 Delhi Gate Phase – I 2.2 10/15 14 Rohini Rohini 15 30/50 15 Ghitorni Ghitorni 5 30/50 16 Molar-Bandh Molar- Bandh 0.66 30/50 Total 348.06 MGD 3.4. Construction of new STPs: Following new STPs are proposed to be constructed at new locations and at the mouth of the drains. Details are as under: Name of S. No Capacity MGD Timeline Remarks STP Process of appointment of 1 Sonia Vihar 7 December-2024 consultant is in process. 2 Rohini 25 December-2024 Estimate under preparation798 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Land is required from DDA/ 3 Delhi Gate 10 December-2024 Revenue Department Allotment of land is awaited 4 Mori Gate 10 December-2024 from DDA. Allotment of land is awaited 5 Barapulla 20 December-2024 from DDA. Total 72 MGD 3.5. Construction of new Decentralized Sewage Treatment Plants (DSTPs) (92 MGD): As per Sewerage Master Plan- SMP 2031, 32 Nos. STPs are to be constructed, out of which, 14 STPs are to be constructed in Najafgarh Drainage Zone and 18 STPs in Narela, Okhla, Outer South Delhi, Kanjhawala, Bawana, Shahdara Zone. Due to land constraint, it has been decided to construct Decentralized STPs at 42 locations in place of 18 STPs. For setting up 56 plants (42 d-STPs + 14 STPs) and 02 STPs at the mouth of drain, land at 73 locations is required, which includes 15 locations for Sewage Pumping Stations (SPS). Out of total 73 locations, land at 10 locations is already available with DJB and for the balance 63 location, land will have to be made available by different agencies as follows: S.No. Name of the Department / Agency Land Locations Land and Building Department, GNCTD after 1 13 locations acquisition from private person 2 Gaon Sabha lands 11 locations 3 DDA 39 locations Grand Total 63 locations 3.6. Status of Decentralized Sewage Treatment Plants: Capacity S. No. Name of STPs Timeline Remark (MGD) 1. 14 (7+7) STPs in 32 18 to 30 months Out of 14 locations, land is Najafgarh after approval of available only at 08 Drainage Zone funding of balance locations and land at STPs by NMCG balance 06 locations is yet and allotment of to be allotted. land[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 799 2. 42 Decentralized 60 24 to 36 months Land for construction of 42 STPs at various after allotment of DSTPs and 07 SPS have locations. (+7 land been identified at various SPS) locations and it is still in the process of allotment by Revenue department of GNCT Delhi. Necessary action will be taken by DJB after allotment of land. Total 92 MGD 3.7. Extension of network to un-sewered areas: The un-sewered area in Delhi mainly consists of unauthorized colonies. As per the list circulated by UD Dept., GNCTD, there are 1799 unauthorized colonies in Delhi. The present status and action plan for providing sewer network in these colonies is tabulated below: Commutative Status as on S. Status November Timeline Remark No. 2020 (Numbers) 1. Sewer line 561 Completed laid and notified 2. Work of 595 Up to Dec, 2024 in sewer phased manner network is in progress 3. Colonies 131 About 03 years The work shall be taken up where NOC after receipt of after NOC from Forest is awaited/ NOC / Clearance Department/Ozone O-Zone from concerned department 4. Colonies 512 For laying The work shall be taken up where sewerage network after allotment and sewerage in these colonies 3 possession of land by DDA800 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] network is to years-time will be & Revenue Dept. As sewer be laid along required after network cannot be laid in with availability of land isolation without first Decentralize for DSTPs. identifying and taking d STP possession of land for constriction of SPS and decentralized STPs. Total 1799 3.8. Sewage Generation anticipated in Land Pooling Area: As per Zero Liquid Discharge (ZLWD) policy for sewers, Decentralized STPs are to be constructed within premises of the Building / Complex in DDA Development/ Land Pooling Areas. Since Sewage is proposed to be treated within the Land Pooling Area, no centralized sewerage treatment system is required for Land Pooling Areas. Treated effluent from DSTPs within sector / Housing Complex will be reused for flushing, gardening and other secondary purposes to the maximum extent and unutilized treated effluent, if any may be utilized for recharging nearby Water Bodies etc. For Land Pooling Areas, Decentralized Sewage Treatment Plants (DSTPs) will be required to be constructed and provision for land for DSTPs will required to be made in DDA Master Plan – 2041 as per Sector Layout Planning. Land requirement norms for construction of STP/SPS/EPS will be as under: a) Land requirement for STP including Sewage Pumping Station & Effluent Pumping Station for capacity up to 22.7 MLD (up to 5 MGD) - 650 m2/MLD. b) Land requirement for STP including Sewage Pumping Station& Effluent Pumping Station for capacity above 22.7 MLD (above 5 MGD) - 1100 m2/MLD. c) Land requirement of 50 m2/MLD for construction of Sewage Pumping Station and 50 m2/ MLD required for Effluent Pumping Station. 4. Initiatives taken by Delhi Jal Board for efficient sewerage management and mitigation of pollution in drains/river: 4.1. Interceptor Sewer Project (ISP) The Interceptor Sewer Project (ISP) has been conceptualized for abatement of pollution in the River Yamuna. Under Interceptor Sewer Project, 108 Nos of the drains are trapped and provision of trapping of about 242 MGD flow is being made. Out of proposed 242 MGD, provision for trapping of 238 MGD (98.35%) has already been made. Out of this, 158.70 MGD wastewater is being trapped and treated at the various STPs in the command.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 801 However, the physical works under ISP is almost completed and facility of trapping 242 MGD will be in place, but the actual treatment of this entire quantity of sewage will be done in phased manner only after the completion of the Coronation Pillar, Rithala and Kondli STPs by December 2022. 4.2. Setting up of Decentralized STPs by Institutions/ Schools/ Agencies DJB has framed a policy for Setting up of DSTPs by individual Schools/Institutions/ Complexes/ Parks/ Hospitals etc. to use the treated effluent for horticulture purpose in their parks. 4.3. Enhanced Use of Treated Effluent In pursuit of promoting the use of treated effluent for non-potable purposes, DJB has installed filling points for treated effluent at almost all WWTPs. The Biochemical Oxygen Demand (BOD) stands at ≤20 ppm and the Total Suspended Solids (TSS) stands at ≤30 as well, making it usable for non-potable purposes. DJB has also written to and conducted workshops with a number of Government agencies such as DMRC, PWD, NDMC, SDMC EDMC, NTPC, Indian Railways (for their wagon and carriage washing) and others, encouraging them to use treated effluent. Also, through different incentives in its new policy, DJB is aiming to increase utilization of the treated effluent. 4.4. Rehabilitation of peripheral sewers in Delhi Most of the peripheral sewers are too old and suffering from severe structural deterioration and have outlived their economical life span thereby, exhibiting operational deficiencies. To overcome these problems, it has been proposed to rehabilitate the peripheral system, so that entire sewage generated in city could be transferred to STPs for optimal utilization of installed capacity of plants and reduction of pollution in river Yamuna. Therefore, DJB intends to take up the rehabilitation of peripheral sewers, which are dysfunctional or partially functional due to multitude of problems such as settlement of sewers, sewage gas related structural failures, leaking joints, disjointed sewer pipes, heavy siltation, blockage due to indiscriminate throwing of rubbish and debris into manholes, illegal discharge of trade waste and collapsed sewers. The Rehabilitation of peripheral sewers under Phase -I comprises of diameter ranging from 450mm to 1400mm having length of about 162 km. The Project has been divided into 6 packages and, work is in progress and likely to be completed by 2022. 4.5. Providing House Service Sewer Connection Delhi Jal Board has started a scheme to encourage all such consumers who live in sewered areas but have not taken sewer connections to apply and obtain sewer802 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] connections. Under this scheme, all those who applied for a new sewer connection before 31-03-2020 were not charged any amount and DJB provided them sewer connections at its own cost. All installation charges and road repair charges are to be reimbursed by Delhi Government to DJB as grant-in-aid under “Mukhyamantri Muft Sewer Connection Yojna.” Under this scheme, about 4.84 lac sewer connections have been sanctioned/ regularized. 4.6. Deployment of Mini Sewer Cleaning Machines DJB has deployed 200 Nos. specially fabricated tailor made Sewer Cleaning machines in order to avoid hazardous operation of sewer cleaning by manual labour. The sewers in narrow lanes can be cleaned mechanically without man entry now. 4.7. Septage Management Rules 2018 DJB has made efforts to implement the septage management rules in Delhi ‘Delhi Water Board Septic Tank Waste Management Regulations Act -2018’ under Delhi Water Board Act-1998 for collection, transportation and disposal of waste of septic tank and matter connected therewith. As per the Septage Regulation 2018, DJB has issued 208 Nos. Licenses to the private tanker operators and they are engaged in the collection and disposal of Septage from the individual households from unauthorized colonies/ unsewered areas. The average collection of Septage is approximate to 6-7 Lac litres per day. 4.8. Management of wastewater in storm-water drains in Delhi: As per directions of Hon’ble NGT, Integrated Drain Management Cell (IDMC) has been constituted on 17.03.2020 under the Chairmanship of Chief Secretary of Delhi for remediation and management of all drains of Delhi with representatives of all Drain owning Agencies (DoA). The mandate of IDMC is to prepare a comprehensive action plan for “Alternate Technologies for Management of Waste Water in Drains” in Delhi as per the techno- economic evaluation of the multiple methodologies and techniques suggested in the reports of CPCB. DJB is also making concerted efforts to trap the sewage flowing in the 18 major drains directly out falling into River Yamuna in the Delhi stretch between Wazirabad to Okhla by diverting sewage to nearest STPs. out of 18 major drains 13 drains have already been trapped.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 803 ANNEXURE II: SERVICE PLAN - IRRIGATION AND FLOOD CONTROL DEPARTMENT (I&FCD)804 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] SERVICE PLAN for DRAINAGE MANAGEMENT IRRIGATION AND FLOOD CONTROL DEPARTMENT (I&FC) 1. MANAGEMENT STRATEGY Special recommendation There should be a single institution that bears an overall responsibility of the management of the total storm water drainage system, within NCT of Delhi, for effective administrative management. Dredging and cleaning of drains by I&FC department I&FC Department has large banks along major drains for deployment and movement of machinery and desilted earth is also kept on these banks till its final disposal, either by filling in low lying areas/depressions along drains or shifting into earmarked sanitary land fill sites. Strengthening of embankments of drains of I&FC department Before onset of monsoon, all the embankments of I&FC Department drains are checked in respect of their stability and necessary restoration/repair work, as needed is carried out by respective divisions of I&FC Department. A certificate in this regard is also forwarded by concerned engineers to Head Quarter. I&FC Department also has departmental machinery for such restoration/ strengthening work in the form of hydraulic excavators and dozers. Remodelling of various drains The embankment strengthening/remodelling proposals as of now and their current status in respect of I&FC Department Drains is attached as Annexure-II (a). The above-cited table shows that embankment of most of the drains are in good and stable condition and there is no need for their strengthening. Similar situation is found in respect of need of remodelling of drains. The work of remodelling is in progress at Najafgarh Pond Drain and Bund Drain. For some drains, like Escape Drain No. 1 & Relief Drain, work of remodelling is required but there are land constraints. Remodelling of KSN drain is required as most of the catchment area of this drain is urbanized and many unauthorized colonies were also developed and are being developed. Due to this, there is no scope for percolation of storm water, which has to be carried by this drain. Besides this, due to lack of sewerage[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 805 network in unauthorized colonies the discharge of sewage, household waste and other wastewater are also flowing into KSN drain through various drains of other Agencies. There is no land available for remodelling since the adjacent area on both sides is developed and urbanized. Hence, there is a need, to acquire land for remodelling of KSN drain. For other drains, the work of remodelling and strengthening shall be taken up as per their requirement in future. Canals and their management To keep up the uninterrupted flow of irrigation water to the irrigated land in Delhi, all repair and maintenance works, cleaning/ dredging /desilting, strengthening of embankments are being taken up as per requirement and necessity. Delineation, conservation and management of buffers for all major I&FC drains There are 57 major drains owned and maintained by I&FC Department. The buffer land/ additional land width available along the drains for future development is tabulated and attached as Annexure-II (b). Troublesome drains There are eight troublesome drains, which are detailed out in the service plan report shared by I&FC Department: Sr. Drain Problems / Constraints Remedial Measures No. Name 1. Escape Drain flow being obstructed by The twin water mains may be shifted. Drain No. two water mains lying in the 1 drain itself, No space for De- silting for a stretch, Heavy silt from WTP, Bed level of the drain flat. 2. Biharipur Bounded on both sides with A parallel carriageway may be provided, Drain closely packed houses, No demolition of unplanned/ unauthorized space for movement of de- construction on either side. silting machine, Heavy dumping of MSW and cow dung.806 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 3. Bund Bounded on both sides with Bar screen has been placed, Bypass drain Drain closely packed houses, No constructed, Removing obstructions, A space for movement of de- parallel carriage way may be provided, silting machine, Heavy dumping demolition of unplanned/unauthorized of MSW and cow dung. construction on either side. 4. Relief No space for movement of de- A parallel carriage way may be provided Drain silting machine, Heavy dumping all along the length in the stretch from of MSW in the drain by the local CRPF Camp to Khajuri Chowk by resident, Daily dumping of considering demolition of unplanned / un waste by the hawkers. authorized construction on drain side. NHAI may be asked to remodel the drain in the entire length with proper outfall. 5. Kirari 106 unauthorized, un-sewered DDA shall have to divert their wastewater Suleman colonies contributing to all out falling into KSN drain at two points of Nagar categories of house hold waste, main DDA road drain to adjacent DDA Drain sewage and also dumping of drains. Three culverts of KSN drain shall MSW, During flood season the be demolished and adequate hume pipes residual treated water comes will be laid for increasing the water way with more silt due to which the and smooth discharge of wastewater. siltation occurs. 6. Pankha Heavy daily disposal of MSW A scheme for construction of RCC road drain and other household & market retaining wall on both sides, The M.S wastes, Non availability of Jalies have been erected over the bridges banks and access for to discourage the localities from throwing deployment of machines, of garbage, Joint survey with DJB and Presence of high tension BSES is occasionally conducted time to overhead electric line, time to cope with the ground realities, The Encroachment in the drain, MS boards being erected at vulnerable Heavy floating materials, silt, points to discourage people from dumping debris etc. from inlets/ out falling and throwing of household waste and drains, Local resistance for not garbage. Inviting specialized agencies to stacking the material in front of plan rejuvenation of drain. Deployment of their houses and shops Jal Rakshak. 7. Nasirpur Heavy daily disposal of MSW M.S Jalies have been erected over the Drain and other household &market bridges; MS boards are being erected at wastes, Non availability of vulnerable points, Inviting specialized banks and access for agencies to plan rejuvenation of drain, deployment of machine, R&D for specialized machinery for Presence of water pipeline, effective cleaning of drain, stopping of electric & Telephone cables in sewerage water into the drain, Deployment the water way, Presence of of Jal Rakshak, Installation of MS Jallies high tension overhead electric on the mouth of out falling drains. line, Encroachment in the drain,[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 807 Heavy floating materials, silt, debris etc. from inlets/ out falling drains, Non availability of space for stacking desilted materials, Local resistance for not stacking the materials in front of their houses and shops. 8. Asola Inefficiency of civic agency i.e. DJB may construct STP and lay sewer Drain MCD for collection of MSW from lines in the area. The MCD shall develop houses& markets, construction effective mechanism for collection of MSW of Dhalaos, Lack of civic sense of the household wastes and C&D wastes. and awareness among local R&D for specialized machinery for people. Lack of specialized effective cleaning of drain. Immediate machines fit for cleaning of the filling of vacant posts of technical and work drain in existing circumstance; charge staff. Stopping of sewerage water Lack of power to challan the into the drain. Spreading of general defaulters. awareness about health and hygiene among the people residing all along the drain. 2. FLOOD MANAGEMENT Apex Committee An Apex Committee has been constituted under the Chairpersonship of Hon'ble Chief Minister, Delhi to recommend, supervise and co-ordinate flood control measures in the National Capital Territory of Delhi. The Central Flood Control Room at LM Bund Office Complex, Shastri Nagar Delhi, remains in constant touch with the Control Rooms of different departments i.e. MCD’s, NDMC, PWD and DDA to receive complaints and take appropriate remedial action in case of drainage congestion on account of heavy rains. Disaster management control room at office of D.M. (East) remains functional for relief & rescue operations. In case of any need, the Divisional Commissioner may seek assistance from Army in controlling floods, evacuation of the marooned people, distribution of food supplies and other related matters.808 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Sector Committee Sector Committee is also constituted for each district, under the supervision of a Sector Officer of D.M. rank. The Sector Officer also acts as a link between the various departments, at District level, organized evacuation of the people, if necessary and to re- habilitate them in relief camps and distribution of relief supplies. Function of the Sector Committee: Immediately after its constitution, the Sector Committees will meet within the areas of their jurisdiction and plan the steps needed for dealing with the problems arising out of floods or drainage congestion. Flood Warnings The first warning is issued by Central Flood Control Room as soon as the discharge from Hathnikund Barrage exceeds one-lakh cusecs or Discharge at Manasi exceeds 3500 cusecs for Sahibi / N.G. Drain- where upon the relevant Sector Control Rooms starts functioning and keeps a vigil in their respective areas. Second Warning been issued when the discharge from HathniKund Barrage exceeds 3 lakh cusecs or Discharge at Manasi exceeds 70000 cusecs for Sahibi / N.G. Drain- People residing within the river embankments near to active course shall be warned and arrangement made to shift them[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 809 to safer places. The Police and the staff of the Flood Control Dept. would undertake patrolling along Right & Left marginal embankments and keep vigil on the vulnerable points. The third warning been issued when the discharge from HathniKund Barrage exceeds 5 lakhs cusecs while for Sahibi or Discharge at Manasi exceeds 1 lakh cusecs for Sahibi / N.G. Drain- This warning shall be issued when the discharge at Masani Barrage exceeds one Lakh cusecs. People residing in dangerously exposed areas will be advised to remain alert and move to places of higher altitude, in case of need. Vulnerable Points Levels at S. CRITICAL POINTS ACTION REQUIRED Old Railway No. Bridge 205.33 1. Rescue Boat Club R/B River Additional Filled Earth Bags were Yamuna placed to stop entry of water from (Provisional Riverside. Danger 2. Monastery Market R/B River Additional Filled Earth Bags were Level) Yamuna placed to stop entry of water from Riverside. 3. Geeta Ghat- Entry Point R/B River Additional Filled Earth Bags were Yamuna placed to stop entry of water from Riverside. 4. Qudsia Ghat R/B River Yamuna Hydra was deployed for operation of gates/inlets 5. Nigam Bodh Ghat R/B River Gaps were plugged by placement of Yamuna filled earth bags 6. Tonga Stand Regulator R/B River -DO- Yamuna 7. Vijay Ghat Regulator R/B River Additional Filled Earth Bags were Yamuna placed to stop entry of water from Riverside. 8. Nalla No. 12 & 12A R/B River Pumps were deployed for pumping Yamuna continuously and additional Filled Earth Bags were placed to stop entry of water from Riverside.810 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 9. Regulator at RD-180 m of R.M.E. -DO- 10. Chilla Regulator Gates closed as per requirement 11. Burari Regulator at RD-1135 m of - DO- Jahangirpuri Drain. 206.00 12. Neem Karoli-Gau Shaala R/B Additional Filled Earth Bags were River Yamuna placed to stop entry of water from Riverside. 13. Civil Military Drain Regulator R/B Were closed as per requirement River Yamuna 14. L. F. Bund in Trans Yamuna Area The hard stone and earth bags dumped to prevent erosion of Shanks Shank RD. 1400m & Embankment. Shank RD. 800m 15. Nalla No. 14 Regulator R/B River Pumps were deployed for pumping Yamuna continuously and additional Filled Earth Bags were placed to stop entry of water from Riverside. 16. Outfall of Toe Drain along RME Additional Filled Earth Bags were near RD 2700m of Supplementary placed to stop entry of water from Drain Riverside. 207.00 17. D.J.B site along Ring Road R/B Additional Filled Earth Bags were River Yamuna placed to stop entry of water from Riverside. 3. Actions Taken by I&FC Department  Monitoring of flood In order to monitor the flood situation, control rooms and wireless network are setup throughout the monsoon season and a complete record of the discharges and their water levels is maintained in respect of river Yamuna as well as river Shahibi with the active assistance of CWC, IMD & the neighbouring States. Daily weather report having data of rainfall till date, rainfall during last 24 hours and forecast of the rain as well as floods is generated and shared with all stakeholders to take necessary measures.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 811  Protection and Maintenance of embankments The department has constructed above embankments over different periods to fortify the city against the flood furry and to protect & maintain these embankments, different types of flood protection and maintenance works like protection of embankments, protection/ construction/restoration of spurs, launching aprons, stone pitching etc. are being undertaken by the department on regular basis as per the need. The staff of the Flood Control Dept. would undertake 24x7 patrolling along right & left marginal embankments and keep vigil on the vulnerable points.  Regulators The regulators constructed and maintained by I&FC department at 15 Nos. outfalls of different drains directly out falling into river Yamuna in the city reach will have to be operated from time to time to suitably pump out the city drainage in case the river is in high flood and heavy local rainfall. The regulators/ gate being closed at the time of heavy discharge in the river to check the reverse flow of river into the city side. A close liaison is to be maintained with U.P. Irrigation Department for timely opening of gates of Chilla regulator, if heavy discharge enters Delhi through Shahdara drainage system, either due to heavy local rainfall or rainfall in upstream Loni-Saharanpur U.P. areas. Boats and emergency portable pump sets will have to be kept ready to meet any exigency arising out of the flood situation.  Resources Boats and emergency portable pump sets will have to be kept ready to meet any exigency arising out of the flood situation. Resources are available with the I&FC department to meet out the requirement during monsoon season.  River training works They may be constructed on both sides of the river or only on one side, for some suitable river length, where the river is passing through towns or cities. (ii) Spurs or Groynes: These are constructed, in order to protect the bank from which they are extended, by deflecting the current away from the bank. (iii) Pitching of banks and provision of launching aprons: Banks of a river are directly protected by stone pitching, or by concrete blocks, or by brick lining or by growing vegetable cover, etc. Concrete blocks are very costly, and stone pitching is mostly adopted, if available without much difficulty. The banks of the river are812 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] made stable by giving them a stable slope varying from 1:1 to 2:1 depending upon the material of the bank. They are then pitched, so as to make them strong enough to resist erosion.  Flood Plain Zone In compliance to the directions of Hon’ble National Green Tribunal in the matter of Manoj Mishra Vs. Union of India (O.A. No. 06/2012) vide order dated 13.01.2015 vide which it has been directed that flood plain should be identified for flood, once in 25 years in the interest of ecology, biodiversity and the river flow. IIT Delhi has conveyed flood of 2011 as once in 25 years during which maximum discharge release from Tajewala and maximum gauge recorded at Old Railway Bridge was 205.72 in respect of discharge of 6,41,462 cusecs. The 20 sheets of flood plain maps have been prepared by GSDL based on the maximum water levels observed in year 2011 at various locations with the level of 205.72 round of to 206.00 and forwarded the same to Delhi Development Authority for physical demarcation of flood plain for river Yamuna. 4. KEY INFRASTRUCTURE OR SPECIAL PROJECTS IDENTIFIED DURING THE PLAN PERIOD, ALONG WITH DETAILS OF PROJECTS AND THEIR TIMELINES Table 3. List of Special Projects S. No. Project Name Target Timeline 1. Creation of Water The implementation of this project on a Bodies/ larger scale of about 1180 Acre, as Reservoirs in proposed in the conceptual plan, shall Flood Plains of result in recharge of flood plain of River River Yamuna by Yamuna from Palla to Hiranki and the retaining excess ground water can be tapped through the water in the River existing network of tube wells of DJB and during Monsoon this network can be further augmented by Season from DJB for improving the fresh water supply Palla to to Delhi. Wazirabad. 2. Details of Pilot Activity aimed at improving the quality of Project at Ghoga wastewater as well as to rejuvenate Drain drains. A pilot project to treat at least ten lakh litres per day of wastewater by using ecologically sensitive & sustainable[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 813 technology like constructed wet land system was created to treat wastewater flowing in Ghoga Drain. The Pilot Project comprises construction of SWAB based wetland system. The project has been envisaged to treat 1 MLD of wastewater flowing in Ghoga Drain and the Construction of 6 Nos. check dam of 0.50 M high with stone boulders within an interval of 1 Km each. 3. Pilot Project: In order to rejuvenate the water body a Awarded award of Rejuvenation of pilot project for rejuvenation of Rajokari Excellence Rajokari Water water body was undertaken by the awarded on Body department with objective of: 28.08.2020, under National (i) Treatment of sewerage water by Water Innovation ecological sustainable technology to Summit & Awards reduce pollutant as such BOD COD 2020. dissolved and suspended solid etc. and bring it to permissible level for water body. (ii) Landscaping of open area along with Horticulture work and provision for lighting of the area. Further installation of CCTV camera for security purpose, plantation of creeper plants over the boundary wall in order to increase aesthetic view and greenery, open gym equipment, children play equipment for the purpose of use of this area for complete recreation was also desired and the same is in process that will be completed by 30.04.2021. 4. Widening & Schemes were prepared for raising of strengthening of embankment and strengthening by Embankments widening of embankment from existing along river single lane to two-lane carriageway They Yamuna from were placed and approved by the Palla to Technical Advisory Committee (TAC) in its Wazirabad. 36th& 41st meetings. The Approximate expenditure on widening and strengthening of Embankment from Palla to Wazirabad shall be Rs. 3800 Lacs.814 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 5. Water front A scheme of Rs. 6.22 crores for the Floating of tender development Comprehensive Consultancy services for is in process along Najafgarh Water Front Development on Najafgarh drain Drain from Chhawla Bridge to Basaidarapur Bridge with designing of two lane road on left & right bank of Najafgarh drain & various bridges have been approved by GNCT of Delhi. 6. National The National Hydrology Project, (NHP) is The work Hydrology Project a World Bank supported Govt. of India proposed will be (NHP) scheme with 100% grant in aid to Central partly taken up in & State implementing agencies (IA). I&FC the current Department & DJB have signed the NHP Financial Year as an Implementing Agency (IA) for the and the remaining State of Delhi. work will be taken up in forthcoming NHP aims at taking up the following main years. On activities: completion of this a. Establishing and upgrading Hydro-met project, various network in all the river basins. b. Bringing data being the entire hydro-metrological data on a generated on real standardized central database for easy time will be storage, validation, analysis and available on the dissemination. c. Development of Decision server of NHP for Support Systems for Flood Forecasting, real time reservoir operations, water resources monitoring & can planning & management, conjunctive use be assessed by etc. following a river basin approach. d. the authorized Capacity building of the States and representative of enhancing collaboration between Centre & all other State States and amongst the State themselves Govt. through trainings, establishment of data centres, Centres of Excellence etc. Total allocation of Rs. 3679.76 Crores is made for this work, to be implemented by various Central and State Govt. Agencies. For this purpose, Rs. 25.00 Crores has been allocated for the State of Delhi. Following activity has been approved for implementation by I&FC Department and Delhi Jal Board under National Hydrology Project: - 1. Real Time information system on drainage network in Delhi. 2. Real Time[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 815 information system for rainfall in Delhi. 3. Groundwater Measurement Equipment. 4. Upgradation of Water Testing Laboratories. 7. Strengthening Already and raising of undertaken. right bank of Najafgarh drain 8. Rejuvenation of The water bodies in Delhi are in extremely After issue of 10 water bodies bad shape and are in varying degrees of Administrative entrusted to I&FC environmental degradation. Hence, the Approval and Dept. Govt. of Delhi taken up development and Expenditure rejuvenation of water bodies as a flagship Sanction, the programme. Though I&FC Dept. is not period of land-owning agency but has taken up completion for above 10 water bodies for rejuvenation as rejuvenation of per present Govt. policy. The rejuvenation above 10 water of above water bodies is being taken up in bodies will be 18 holistic manner by constructing the wet months including lands that are ecologically sensitive and all codal sustainable which are most suitable in situ formalities. treatments for discharges of wastewater less than 1 MLD. As a part of rejuvenation, necessary landscaping works, walking tracks, cycling tracks, benches, solar lighting, public amenities like toilets, Amphitheatre where ever feasible will be taken up to facilitate effective utilization for recreation purpose of local public. The estimated cost for rejuvenation of above 10 water bodies including STP and landscaping is Rs. 21.54 Cr. 5. ESTIMATED LAND REQUIREMENTS FOR PROJECTS The department is facing a problem of disposal of desilted earth, as MCDs are reluctant to take the same; hence, it is necessary that DDA may give land parcels at different locations along the drains having size of around 1 ha. each at every 10 Km interval (totalling around 1000ha.).816 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] It is recommended that the service lines in form of sewer, water, electric, communication etc. should be shifted outside the land boundary of I&FC drains. Large chunks of I&FC land are being utilized for the construction of dhalaos by civic agencies, it is suggested that separate land should earmarked outside drain boundary for collection, processing, shifting and disposal of MSW as well as C&D waste along entire align of existing drains. 6. PROJECTED LAND REQUIREMENT IN VIEW OF MPD 2041 The drain wise projected land requirement considering expected remodeling, their operation and maintenance, creation of green belt, for processing of the desilted earth, for service road, for service lines, for C&D waste and additional stores etc. is attached as Annexure-II (b). The additional land available for future use along drains varies with drains as well as their stretch/locations. In upper reaches of Najafgarh its width is more than 135 m. while in lower portion (which is highly urbanized) it comes down to 25 m. Similar situations exist in other drains also. This additional land is being utilised for service lines like sewer lines, water pipeline, H.T. lines, communications cables etc. in addition to construction of Dhalaos, Chhat Pooja Ghats, Mohalla clinics, Parks etc. To create green zones along drains plantation work has also been done on the available drain land at different locations. 7. KEY TARGETS THAT WILL BE INCLUDED IN MPD 41 ACTION PLAN Component Current status Target for 2041 Phasing Plan Length (in km) of The drain wise status of length of drain, width, depth of drain, buffers created and catchment area, design discharge, present status of embankments maintained along & status of buffer land along the drains is annexed as (Annexure-II major drains (b))[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 817 8. SUGGESTIONS AND RECOMMENDATIONS For construction of new drains in the sub cities to be planned under Master Plan 2041, following recommendations are made with regard to planning / construction of drainage system: a) The existing drainage network of Irrigation and Flood Control Department may be remodeled within the limits of the feasibility, to integrate the drainage network of sub-cities to be planned under Land Pooling Policy / MPD-2041, whenever, the relevant details are shared with I&FC Department in consultation with all stakeholders. b) Provision should be made for continuous green lines along the entire course of the drains on both sides. c) A separate provision for the services lines like sewer, water, electric, communication etc. should be made outside the drain boundary areas. d) A separate provision for land for collection, processing, transportation, shifting and disposal should be made for MSW as well as C&D waste. e) New development should be made in such a way that overall runoff from the area does not increase with the proposed urbanization. For that necessary measures in form of ponds, parks, porous pavements, green belts, artificial lakes / or other rainwater harvesting and storage structures etc. may be adopted. f) The officers involved in drainage and flood management should be given exposure to International best practices, so as to adopt the same to the National Capital City of Delhi. Referred annexures for I&FC Service Plan: Annexure II (a): Embankment Strengthening /Remodelling Status of Drains Annexure II (b): Details of Buffers along Drains of I&FC Department Annexure II (c): Detail of Effluent Irrigation System818 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ANNEXURE – II (a) : Embankment Strengthening /Remodelling Status of Drains Name of Drain Length of Present status of Whether any Whether Drain (in KMs) Embankment strengthening remodelling of proposed or drain is proposed/ required required CD-I Najafgarh Drain, CD-I- 45.31 Stable No NA 45316m Palam Drain 4.20 Stable No NA Palam Link Drain 1.47 Stable No NA Najaf Garh Pond Yes 1.95 Stable No Drain Work in progress. Nasirpur Link Drain 2.90 Stable No NA Bijwasan Drain 4.20 Stable No NA Pankha Road Drain 3.60 Stable No NA Shahbad 0.23 Stable No NA Mohammadpur Drain Mudhela Drain CD-I- 6.95 Stable No NA 6920m, CD-II Supplementary Drain Inspection path -N/A- -N/A- D 16436 m to RD i) L/B 17700 to Section Section already 22471 m 19362- CC Road already lined lined ii) R/B 16436 to 16700- CC Road iii) R/B 21350 to 22137-CC Road 6.04 Mohalla Clinic(RD 17700m R/B) 1500 plants proposed b/w RD 16436m to 22471m at scattered locations[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 819 Name of Drain Length of Present status of Whether any Whether Drain (in KMs) Embankment strengthening remodelling of proposed or drain is proposed/ required required 350 Sapling already planted and their maintenance is in progress 11.82 Najafgarh Drain, RD Inspection Road No proposal No proposal of 45316 m to RD i) L/B RD 47390m of remodelling as of 57140m to RD 48300m strengthening now CC/Bituminous as of now - Remodelling Road - work shall be ii) L/B RD 54346m strengthening done if so to Nose Point work shall be required in future. CC/Bituminous done if so Road necessitated iii) L/B RD 56306m in future to RD 57106m CC/Bituminous Road iv) R/B RD 46870m to RD 48315m CC Road v) R/B RD 54346m to RD 56704m Bituminous Road CD-III Trunk Drain No.I , CD- III-5260m, 5.26 Good NO NO RD 0m to RD 3200m820 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Name of Drain Length of Present status of Whether any Whether Drain (in KMs) Embankment strengthening remodelling of proposed or drain is proposed/ required required RD 3200m to 5260m Trunk Drain No. II RD-4550m to RD- 3900m RD-3900m to RD-3230m 4.55 Good NO NO RD-3230m to RD-1980m RD-1980m to RD-0m Shahdara Outfall Drain RD-5900m to RD- 5.90 Good NO NO 0m Ghazipur Drain RD-0m to RD- 2135m RD-2135m to RD- 3505m 6.15 Good NO NO RD-3505m to RD- 5090m RD-5090m to RD- 6157m Shahdara Link Drain RD 4545m to RD- 3500m= 45.15m RD 3500m to RD- 3065m= 53.50m 4.56 Good No NO RD 3065m to RD-2565m= 44.50m RD 2565m to RD- 2150m= 36.45m[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 821 Name of Drain Length of Present status of Whether any Whether Drain (in KMs) Embankment strengthening remodelling of proposed or drain is proposed/ required required RD 2150m to RD 1330m = 43.45m RD 1330m to RD- 930m = 43.45m RD 930m to RD- 330m = (covered portion) 43.00m RD 330m to RD 130m= 43.45m CD-IV Trunk Drain No.I , CD- 8.13 IV-5260m, to 13387m RD 5260m to 6690m 1.43 Good No No RD 6690m to 10330m 3.64 RD 10330m to 3.06 13387m Karawal Nagar Drain 2.48 Good No No Biharipur Drain 1.00 No sufficient land RD 0m to RD 650m 0.65 is available for No No RD 650m to RD 0.35 Embankment. 1000m Bund Drain 3.45 No sufficient land Yes Remodelling of is available for drain is in Embankment. progress on existing section as the no sufficient land is available along the drain. Escape Drain No. I 2.98 Good from RD 0m NA Drain is passing822 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Name of Drain Length of Present status of Whether any Whether Drain (in KMs) Embankment strengthening remodelling of proposed or drain is proposed/ required required RD 0m to 980m 0.98 to RD 2650m. through thickly RD 980m to 1650m 0.67 populated area. No sufficient land Due to land RD 1650m to 2650m 1.00 is available for constraint, no RD 2650m to 2980m 0.33 Embankment from any remodeling is RD 2650m to RD proposed 2980m. between RD 1650m to RD 2560m. However remodeling is required in near future. Escape Drain No. II 0.45 Good No No Relief Drain 2.18 Drain is passing RD 0m to 695m 0.70 through thickly populated area. RD 695m to 965m 0.27 Due to land RD 965m to 1860m 0.90 No sufficient land constraint, no RD 1860m to 2180m 0.32 is available for NA any remodeling is Embankment. proposed. However remodeling is required in near future. CD-V Ali Drain 2.78 1 side Road 1 side No No NTPC. Asola Drain 3.39 on Right side from There is 400 to 600 RD. kuchcha zigzag drain passes through[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 823 Name of Drain Length of Present status of Whether any Whether Drain (in KMs) Embankment strengthening remodelling of proposed or drain is proposed/ required required private land and water spreads in the open field and there is no outfall of drain. Molar Bund Extension 1.38 No No No Drain Sarita Vihar Drain 1.30 Earthen No No CD-VI Drain No. 6 14.73 Good condition Not required Not required Burari Creek 8.86 Good condition Not required Not required Burari Drain 6.04 Good condition Not required Not required New Drain 5.40 Good condition Not required Not required Jagatpur Link Drain 2.46 Good condition Not required Not required (Link Drain No. II) Toe Drain 4.00 Good condition Not required Not required CD-VII BAWANA ESCAPE 19.79 Strengthen No No DRAIN Bankner Link Drain 5.43 Good Yes No Khera Khurd Drain 5.20 Good Yes Yes Ghoga Link Drain 5.12 Good No No Naya Bas Link Drain 3.00 Good No Yes Sanoth Link Drain 3.35 Good No Yes Alipur Link Drain 0.88 Good No No Tikri Khurd Link Drain 1.94 Good Yes Yes Khera Kalan Drain 0.86 Good No No (Link)824 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Name of Drain Length of Present status of Whether any Whether Drain (in KMs) Embankment strengthening remodelling of proposed or drain is proposed/ required required Bawana Drain RD 1.830 Good No No 9561M to RD 11391M Nangloi Drain CD-VII- 2.10 Good No No 2100m CD-VIII MungeshPur Drain RD 15850 m to RD 21.65 Earthern - - 37550 m Bazitpur Drain RD 0 8.05 Earthern - - m to RD 8049 m Bawana Drain RD 0 10.83 Earthern - - m to RD 9561 m Ladpur Link Drain 2.30 Earthern - - RD 0 to RD 2300 m Katewara Link Drain 1.33 B/Work - - RD 0 m to RD 1330 m Jatkhor Link Drain 3.76 Earthern - - RD 0 m to RD 3760 m Nangal Thakran Link Drain RD 0 m to RD 0.90 Earthern - - 900 m Madanpur Drain RD Channelization of 4100 m to RD 8229 m drain near Ghewra village 4.13 Earthern - on up stream of Railway line crossing is required Kirari Suleman RD Remodelling of 4150 to RD 7850 m KSN drain is 3.70 Dry brick - required as the most of the[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 825 Name of Drain Length of Present status of Whether any Whether Drain (in KMs) Embankment strengthening remodelling of proposed or drain is proposed/ required required catchment area of this drain is urbanized and many unauthorized colonies were also developed and being developed. Due to this, there is no scope for percolation of storm water and which has to be carried by this drain. Besides this, due to lack of sewerage network in unauthorized colonies the discharge of sewage, household waste and other wastewater are also flowing into KSN drain through various drains of other Govt. Agencies. There is no land available for826 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Name of Drain Length of Present status of Whether any Whether Drain (in KMs) Embankment strengthening remodelling of proposed or drain is proposed/ required required remodeling since the adjacent area in both sides is developed and urbanized. Hence, there is a need, to acquire land for remodeling of KSN drain. Sultanpur Drain RD 0 Strengthening m to RD 9200 m of bank is required on upstream 9.20 Earthern side of - Karala- Kanjhawala road at Rupali Enclave Rasulpur Link Drain 0.75 Earthern - - RD 0 m to RD 750 m CD-IX Supplementary drain Inspection road, from RD 0to dhalao, twin RD 16436m pipeline of DJB, PWD Road, Strengthening Remodelling 16.44 Plantation and Required Required Mohalla Clinic etc. exist on Bank of Supplementary Drain. CD-X[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 827 Name of Drain Length of Present status of Whether any Whether Drain (in KMs) Embankment strengthening remodelling of proposed or drain is proposed/ required required Jahangir Puri Outfall drain RD 0m to RD 1700m Strengthening RD 1700m to RD and 3000m RD 0m to RD upgradation 4800m both side of regulator at RD 3000m to RD 5.47 bank PCC tile lined RD 1135m. 4000m & RD 4800m to (Work being No RD 4000m to RD RD 5470m both taken by 4800m side bank stone Mechanical pitching Division-II, in RD 4800m to RD year 2020- 5470m 21.) CD-XI Supplementary Drain, CD-XI RD 22471m to RD 2.604 Land/Road exist 25075m on left bank of RD 25075m to RD 0.985 Supplementary 26060m Drain where park, Mohalla Clinic, RD 26060m to RD 2.020 Chhat Ghat, 28080m Inspection Road RD 28080m to RD 3.220 and Dhalao have 31300m Strengthening Remodelling been constructed. RD 31300m to RD 3.200 required required Around 10000 nos. 34500m plants has been planted on left bank of Supplementary Drain. On the right bank Kaccha inspection Road828 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Name of Drain Length of Present status of Whether any Whether Drain (in KMs) Embankment strengthening remodelling of proposed or drain is proposed/ required required exists which is common bank of N G Drain and Supplementary Drain. CD-XII Madanpur Drain 4.10 - Not Required Not Required (RD 0m to RD 4100m) Kirari Suleman Nagar Drain 4.10 - (RD 0m to RD 4100m) (RD 0m to RD 1722m) 1.72 - Not Required Not Required (RD 1722m to RD 1.98 - 3700m) (RD 3700m to RD 0.40 - 4100m) Mundka Peripheral Drain 2.35 - Not Required Not Required (RD 0m to RD 2345m) Ranhola Pond Drain 1.16 - Not Required Not Required (RD 0m to RD 1160m CD-XIII MungeshPur Drain 10.362 Stable No No CD-XIII-10362m 0m to 1575m = 1575m to RD. 6600m RD.6600m to 10362M Bhupania Chudania 8.55 Stable No No Drain (including RD. 0m to Haryana portion) 2736m[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 829 Name of Drain Length of Present status of Whether any Whether Drain (in KMs) Embankment strengthening remodelling of proposed or drain is proposed/ required required RD. 6280m to 8550M RD.2736m to 6280M (Haryana State) Mudhela Drain CD- 5.60 Stable No No XIII- From 6950 to 12560m Nangli Sakrawati Link 0.93 Stable No No Drain, CD-XIII- RD- RD. 0m to 385 0m to 385m = 385m, RD. 1712m to CD-XIII-RD-1712m to RD.2262m 2262m = 550m ANNEXURE – II (b): Details of Buffers along Drains of I&FC Department DETAILS OF BUFFERS ALONG DRAINS OF I&FC DEPARTMENT Additional land required Name Leng Rea Reach Dept Balan Remodelli Operatio Creati For For For For For Other Total Remarks of th of ch wise h of ce ng / n & on of process Servi services C&D additio s, if (in Drain Drain wise top drai land augmenta maintena green ing of ce like; was nal any hecta (in total drain n (in width tion nce belt desilted road electric te stores re) KMs) land width mtr.) (in earth line, of widt (in mtr.) communic I&FC h (in mtr.) (Buffe ation Dept. mtr.) includi rs) cable, pipe / ng lines Righ water water/sewe t of way r & dhalao way FC-I Jahan gir Puri Outfall drain RD 0m 75.0 to RD 54.00 21.00 1700m 5.47 0 2.00 mtr RD 3.50 mtr 2 mtr each each 1700m 66.0 1.80 each side side 48.00 18.00 --- side --- --- --- --- --- 8.20 to RD 0 m Total = Total = 4.00 Total 3000m 7.00 mtr mtr = 4.00 RD mtr 31.0 3000m 27.00 4.00 0 to RD830 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] DETAILS OF BUFFERS ALONG DRAINS OF I&FC DEPARTMENT Additional land required Name Leng Rea Reach Dept Balan Remodelli Operatio Creati For For For For For Other Total Remarks of th of ch wise h of ce ng / n & on of process Servi services C&D additio s, if (in Drain Drain wise top drai land augmenta maintena green ing of ce like; was nal any hecta (in total drain n (in width tion nce belt desilted road electric te stores re) KMs) land width mtr.) (in earth line, of widt (in mtr.) communic I&FC h (in mtr.) (Buffe ation Dept. mtr.) includi rs) cable, pipe / ng lines Righ water water/sewe t of way r & dhalao way 4000m RD 4000m 35.0 33.00 3.00 to RD 0 4800m RD 4800m 54.0 43.00 12.00 to RD 0 5470m Trunk Drain No.I , CD-III- 5260m RD 0m 5.26 54.8 2.67 to RD 38.00 16.86 10.00 7.50 14.00 7.50 5.00 5.00 15.68 6 3200m RD 3200m 22.8 20.00 2.86 24.00 7.50 14.00 7.50 5.00 5.00 12.98 to 6 5260m RD 5260m 45.0 1.43 33.00 4.00 12.00 8.00 10.00 5.00 5.00 4.00 to 0 6690m RD 6690m 45.0 to 3.64 25.00 4.50 20.00 10.00 5.00 5.00 7.28 0 10330 m RD 10330 37.0 m to 3.06 15.00 4.50 22.00 10.00 5.00 5.00 6.11 0 13387 m Trunk Drain No. II 20.00 RD- 4550m 15.2 15.24 0.00 32.00 7.50 14.00 7.50 5.00 5.00 4.62 to RD- 4 3900m RD- 3900m 32.7 20.05 12.69 20.00 7.50 14.00 7.50 5.00 5.00 3.95 Drains to RD- 4.55 4 2.60 3230m under the jurisdiction RD- are 3230m 45.2 20.55 24.69 8.00 7.50 14.00 7.50 5.00 5.00 5.88 passing to RD- 4 through 1980m the RD- densely 1980m 54.8 populated to RD- 6 22.80 32.06 7.50 14.00 7.50 5.00 5.00 7.72 area, 0m acquisition of the Shahd proposed ara additional Outfall land is Drain only 5.90 3.26 RD- possible if 5900m 135. the to RD- 00 58.764 76.236 10.00 14.00 5.00 5.00 20.06 redevelop 0m ment of the nearby Ghazip area of the ur Drain 6.15 3.11 drain proposed RD-0m 104. 54.44 49.56 5.00 7.50 14.00 5.00 5.00 7.79 by DDA[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 831 DETAILS OF BUFFERS ALONG DRAINS OF I&FC DEPARTMENT Additional land required Name Leng Rea Reach Dept Balan Remodelli Operatio Creati For For For For For Other Total Remarks of th of ch wise h of ce ng / n & on of process Servi services C&D additio s, if (in Drain Drain wise top drai land augmenta maintena green ing of ce like; was nal any hecta (in total drain n (in width tion nce belt desilted road electric te stores re) KMs) land width mtr.) (in earth line, of widt (in mtr.) communic I&FC h (in mtr.) (Buffe ation Dept. mtr.) includi rs) cable, pipe / ng lines Righ water water/sewe t of way r & dhalao way to RD- 00 2135m RD- 2135m 104. 53.83 50.17 7.50 5.00 5.00 2.40 to RD- 00 3505m RD- 3505m 104. 52.59 51.41 7.50 5.00 5.00 2.77 to RD- 00 5090m RD- 5090m 85.0 47.73 37.27 5.00 7.50 7.00 3.50 5.00 5.00 3.52 to RD- 0 6157m Shahd ara Link Drain RD 4545m 45.1 22.25 22.90 10.00 7.50 10.00 5.00 5.00 3.92 to RD- 5 3500m RD 3500m 53.5 22.25 31.25 10.00 7.50 10.00 5.00 5.00 1.63 toRD- 0 3065m RD 3065m 44.5 22.25 22.25 7.50 5.00 5.00 5.00 1.13 to RD- 0 2565m RD 2565m 36.4 22.25 14.20 7.50 5.00 5.00 5.00 0.93 to RD- 5 2150m 2.13 4.56 5 RD 2150m 43.4 22.25 21.20 7.50 5.00 5.00 5.00 1.85 to RD 5 1330m RD 1330m 43.4 22.25 21.20 7.50 5.00 5.00 5.00 0.90 to RD- 5 930m RD 930m to RD- 330m 43.0 15.45 27.55 7.50 5.00 5.00 5.00 1.35 (Cover 0 ed Portion ) RD 330m 43.4 22.25 21.20 7.50 5.00 5.00 5.00 0.45 to RD 5 130m Karaw al 38.9 2.48 14.00 4.00 24.96 5.00 5.00 5.00 3.72 Nagar 6 Drain Bihari pur 1.00 4.00 Drain RD 0m to RD 0.65 4.50 2.00 1.50 2.50 5.00 6.00 5.00 6.00 6.00 3.00 3.00 2.14 650m RD 650m 0.35 8.00 2.00 1.50 6.00 5.00 4.00 5.00 5.00 4.00 3.00 3.00 1.02 to RD832 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] DETAILS OF BUFFERS ALONG DRAINS OF I&FC DEPARTMENT Additional land required Name Leng Rea Reach Dept Balan Remodelli Operatio Creati For For For For For Other Total Remarks of th of ch wise h of ce ng / n & on of process Servi services C&D additio s, if (in Drain Drain wise top drai land augmenta maintena green ing of ce like; was nal any hecta (in total drain n (in width tion nce belt desilted road electric te stores re) KMs) land width mtr.) (in earth line, of widt (in mtr.) communic I&FC h (in mtr.) (Buffe ation Dept. mtr.) includi rs) cable, pipe / ng lines Righ water water/sewe t of way r & dhalao way 1000m Bund 3.45 7.50 3.70 2.00 3.80 5.00 4.00 5.00 3.00 6.00 3.00 3.00 10.00 Drain Escap e Drain 2.98 No. I RD 0m 25.9 to 0.98 8.00 4.00 3.00 3.00 0.60 0 980m RD 980m 23.0 0.67 6.00 3.00 17.90 4.00 5.00 5.00 6.00 3.00 3.00 1.74 to 0 1650m RD 1650m 18.2 1.00 6.00 2.50 17.00 5.00 4.00 5.00 5.00 6.00 3.00 3.00 3.10 to 3 2650m RD 2650m 17.0 0.33 2.80 2.00 12.23 5.00 4.00 5.00 5.00 6.00 3.00 3.00 1.02 to 0 2980m Escap 30.0 e Drain 0.45 10.00 3.00 20.00 5.00 3.00 3.00 0.50 0 No. II Relief 2.18 Drain RD 0m 27.0 to 0.70 13.00 2.00 14.00 3.00 3.00 6.00 3.00 3.00 1.26 0 695m Not RD visibl 695m e 0.27 5.00 3.00 5.00 3.00 6.00 3.00 3.00 0.76 to mars 965m h land RD 965m 0.90 8.00 2.60 1.20 5.40 5.00 3.00 5.00 3.00 6.00 3.00 3.00 2.52 to 1860m RD 1860m 15.0 0.32 5.00 1.50 10.00 3.00 5.00 3.00 6.00 3.00 3.00 0.74 to 0 2180m 154.2 FC-I 4 FC-II 1. RD 1. RD For RD 1. RD RD 0 m 0 m RD 0 to Services 2600m 0m to 10000 m to to (26.95x0.5)x1 13025m = 13025x2 = 2650 to RD --- 1725 1725 725 ---- 13025 m x 5m ---- = 26050 20m x ---- m = 11000 m - m = m = = 23244 Sqm. X 2= 130250 Sqm 15m = 45.00 40000 26.95 18.05 Sqm. 300 Mtr Vari Sqm Mtr. Mtr. For Sqm. es Dhalao from Drain 14.7 RD 37.27 3.40 No.6 3 2. RD 2. RD Mtr 2. RD 2600m RD 5 2650 1725 4.10 1725 RD 2315 7700m m to m to Mtr m to (26.6x0.5)x(2 RD 2975 = 6600 2250 2250 250-1725) ---- ---- ---- ---- RD 20m x m = m = m = = 6983 Sqm 12000 15m = 44.00 26.60 18.40 RD 300 Mtr Mtr. Mtr. 11700 Sqm. 5 x 15m x 15m =[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 833 1025 Sqm. 3. RD 3. RD 3. RD 6600 2250 2250 m to m to m to (22.05x0.5)x( --- 1250 2650 2650 2650-2250) ---- ---- ---- ---- ---- ---- - 0m = m = m = = 4410 Sqm 40.00 22.05 27.95 Mtr Mtr. Mtr. 4. RD 4. RD 4. RD 1250 2650 2650 0m m to m to (26.6x0.5)x(2 to --- 2825 2825 825-2650) ---- ---- ---- ---- ---- ---- 1472 - m = m = = 2328 Sqm 5m = 26.60 17.40 28.00 Mtr. Mtr. Mtr. 5. RD 5. RD 2825 2825 m to m to (28.7x0.5)x(6 --- 6600 6600 600-2825) ---- ---- ---- ---- ---- ---- - m = m = = 54171 Sqm 28.70 15.30 Mtr. Mtr. 6. RD 6. RD 6600 6600 m to m to (26.45x0.5)x( --- 7730 7730 7730-6600) ---- ---- ---- ---- ---- ---- ---- - m = m = = 14944 Sqm 26.45 13.55 Mtr. Mtr. 7. RD 7. RD 7730 7730 m to m to (26.1x0.5)x(9 --- 9700 9700 700-7730)= ---- ---- ---- ---- ---- ---- ---- - m = m = 25709 Sqm 26.10 13.90 Mtr. Mtr. 7. RD 7. RD 9700 9700 m to m to (23.5x0.5)x(1 --- 1070 1070 0700-9700) ---- ---- ---- ---- ---- ---- ---- - 0m = 0m = = 11750 Sqm 23.50 16.50 Mtr. Mtr. 8. RD 8. RD 1070 1070 0m to 0m to (19.2x0.5)x(1 --- 1250 1250 2500-10700) ---- ---- ---- ---- ---- ---- ---- - 0m = 0m = = 17280 Sqm 19.20 20.80 Mtr. Mtr. 9. RD 9. RD 1250 1250 0m to 0m to (12.5x0.5)x(1 --- 1472 1472 4725-12500) ---- ---- ---- ---- ---- ---- ---- - 5m = 5m = = 13906 12.50 15.50 Mtr. Mtr. For Services From RD 0 m to RD 8867 m x 2.0 m = 17734 Sqm 500 Sqm For From RD 0 (Near From RD 0 m Dhalao (12x0.5)x(886 m to RD RD Burari 10 to 10 to to RD 8867 m Near RD --- 8.86 20.00 2.10 7) ---- ---- 8867 m x 2300 M ---- 18.90 Creek 12 8 x 5.0 m x 2 = 450 M - = 53202 Sqm 3.0 m = Near 88670 Sqm Near RD 26601 Sqm RD 1050M 6000 Near RD M) 1450 M Near RD 1950 M Near RD 4150 M Near RD 5250 M Near RD 5850 M834 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Near RD 6500 M Near RD 7850 M Near RD 450 M New Course 10x15x1 5 =2250 Sqm For services 5488x2 = 10976 Sqm From RD 0 For m to RD From RD 0 m 3.50 3.50 Dhalao (5x0.5)x(6040 5488 m to RD 5488 m Burari to to Near RD --- 10.88 6.04 0.60 Nil ) ---- ---- ---- ---- Drain 6.00 6.00 3500 M - 46 = 15100 Sqm 5488 x 5.00 5488 x 5.00x2 M M Near RD = =54880Sqm 5100 M 27440 Sqm 2 x 15.00x 15.00 = 450.00 Sqm For services From RD 0 to from RD (48x0.5)x(540 5400 m 0 to New 0) 5.40 61.00 48.00 5.20 13.00 ....... ---- 5400 m ....... ..... 19.44 Drain = 129600 5400x5x2 = .. Sqm 54000 Sqm 5400*2 = 10800 Sqm For services 2460x2 Jagatp = 4920 From RD 0 ur Link From RD 0 to SqmFor (2.5x0.5)x(24 m to RD Drain 2460 DhalaoN --- 2.46 4.00 2.50 2.50 1.50 60)= 3075 500 m500 x ---- ---- ---- ---- 3.532 (Link m2460x5x2 = ear RD - Sqm 5.00 = 2500 Drain 24600 Sqm 300 M1 Sqm No. II) x 15.00x 15.00 = 225.00 Sqm For services 4000x2 = 8000 Sqm For Dhalao From RD 0 Near RD From RD 0 m m to RD 3240 M to RD 4000 (1.5x0.5)x(40 4000 m Near RD Toe m --- 4.00 1.50 1.50 1.20 Nil 00) ---- ---- 2500 M ---- ---- 7.19 Drain - = 3000 Sqm 4000 x 5.00 Near RD 4000x5x2 = = 1900 M 40000 Sqm 20000 Sqm Near RD 850 M 4 x 15.00x 15.00 = 900.00 Sqm Total Area CD- 97.22 VI Remodelling For service i) RC augmentation Length RD 0 lane 19100 M for for future M to RD Length RD & 19200 store requirement 19790 M = 0 M to RD M at RD BAWA Length along 19790M At RD 19790 M = (Budhpu 9900 M NA 40.50 19.42 1.50 drain RD 0 M Width 5 M 11000 M 19790M r) 19.7 21.04 area ESCA M 5 M to to RD 19790 - both side of area 5 Width 4.25 ii) RD - - 78.28 9 75 15M x PE (Avg) (Avg.) 4.80 M = 19790M drain Acre M both side 4165 M 15 M = DRAIN Width area 2 x or 2 Ha. of drain to RD 225 extended 19790 x 5 = 1, area 2 x 4795 M Sqm 10 M 97,900 Sqm 19790 x (Near 0.02 Ha area 19790 x or 19.79 Ha. 4.25 = 1, R/B) J.J. 10 = 1, 97,900 68,215 Amar[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 835 Sqm Sqm Colony or 19.79 Ha. or 16.82 Bawana Ha. – Narela Road. (iii) RD 13400 M (R/B) Metro Vihar Holambi Kalan. area 3x 15M x 15 M = 675 Sqm 0.0675 Ha RD 2950 For service M (Near Remodelling laneLength Saboli augmentation RD 0 M to Road X- for future Length RD 0 RD 5430 M ing requirement M to RD 5430 = culvert). Length along M = 5430MWidt RD 3906 Bankn drain RD 0 M 5430MWidth 14.10 h 4.25 M M (Pio 14.43 er Link 5.43 11.25 1.00 2.85 to RD 5430 M - 5 M both side - - - - Avg. both side of Manihari 5 Drain = of drain area drain area Road X- 5430MWidth 2 x 5430 x 5 = 2 x 5430 x ing).area extended 8 M 54300 Sqm or 4.25 = 2x 15M area 5430 x 8 5.43 Ha. 46,155 x 15 M = = 43,440 Sqm Sqm or 450 or 4.34 Ha. 4.62 Ha. Sqm0.04 5 Ha Remodelling For service augmentation lane RD 740 for future Length RD 0 Length RD M (Near requirement M to RD 5200 0 M to RD Bhatte Length along M = 5430M 5200 M = wala drain RD 0 M Width 5 M 5200M Khera Road) to RD 5200 M both side of Width 4.25 12.24 Khurd 5.20 6.75 3.40 0.80 3.35 - - area - - - = 5200M drain M both side 3 Drain 15M x Width area 2 x 5200 of drain 15 M = extended x 5 = 52000 area 2 x 225 Sqm 5 M Sqm 5200 x 4.25 0.0225 area 5200 x 5 or 5.20 Ha. = 44,200 Ha = 26,000 Sqm Sqm or 2.60 Ha. or 4.42 Ha. Remodelling For service augmentation lane for future Length RD 0 Length RD requirement M to RD 5120 0 M to RD Length along M = 5120M 5120 M = drain RD 0 M Width 5 M 5120M Ghoga to RD 5120 M both side of Width 4.25 Link 5.12 5.00 5.00 0.80 0.00 - - - - - - 12.03 = 5120M drain M both side Drain Width area 2 x 5120 of drain extended x 5 = 51200 area 2 x 5 M Sqm 5120 x 4.25 area 5120 x 5 or 5.12 Ha. = 43520 = 25600 Sqm Sqm or 2.56 Ha. or 4.35 Ha. RD 490 Remodelling For service M augmentation laneLength CULVE for future Length RD 0 RD 0 M to RT (Nar requirement M to RD 3000 RD 3000 M Opposite Length along M = = Naya Metro 0.45 drain RD 0 M 3000MWidth 3000MWidt Bas 8.50 vihar 3.00 7.00 to 1.50 to RD 3000 M - 5 M both side - h 4.25 M - - - 7.073 Link Avg Holambi 0.50 = of drain area both side of Drain Khurd)ar 3000MWidth 2 x 3000 x 5 = drain area ea 15M extended 5 M 30000 Sqm or 2 x 3000 x x 15 M = area 3000 x 5 3.00 Ha. 4.25 = 225 = 15000 Sqm 25500 Sqm Sqm0.02 or 1.50 Ha. or 2.55 Ha. 25 Ha Remodelling For service augmentation Length RD 0 lane for future M to RD 3350 Length RD requirement M = 3350M 0 M to RD Length along Width 5 M 3350 M = Sanoth drain RD 0 M both side of 3350M Link 3.35 10.80 9.00 1.40 1.80 - - - - - - 7.88 to RD 3350 M drain Width 4.25 Drain = 3350M area 2 x 3350 M both side Width x 5 = 33500 of drain extended Sqm area 2 x 5 M or 3.35 Ha. 3350 x 4.25 area 3350 x 5 = 28475836 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] = 16750 Sqm Sqm or 1.68 Ha. or 2.85 Ha. RD 0 M, (Near Remodelling For service Kiran augmentation lane Garden) for future Length RD ii) RD Length RD 0 requirement 0 M to RD 435 M M to RD 880 Length along 880 M = (Near M = 880M drain RD 0 M 880M Alipur Alipur Width 5 M to RD 880 M Width 4.25 City Link 0.88 30.00 3.50 2.50 26.50 - both side of - - 2.115 = 880M M both side Forest Drain drain Width of drain Road) area 2 x 880x extended area 2 x 5 = 8800 Sqm 5 M 880 x 4.25 area 2x or 0.88 Ha. area 880 x 5 = = 7480 15M x 4400 Sqm Sqm 15 M = or 0.44 Ha. or 0.75 Ha. 450 Sqm 0.045 Ha Remodelling For service augmentation laneLength for future Length RD 0 RD 0 M to The requirement M to RD 1940 RD 1940 M drain Length along M = = Tikri existi drain RD 0 M 1940MWidth 1940MWidt Khurd 1.94 ng in 3.50 0.80 - to RD1940 M - 5 M both side - h 4.25 M - - - - 4.56 Link the = of drain area both side of Drain NH-1 1940MWidth 2 x 1940x 5 = drain area Land extended 5 M 19400 Sqm or 2 x 1940 x area 1940 x 5 1.94 Ha. 4.25 = = 9700 Sqm 16490 Sqm or 0.97 Ha. or 1.65 Ha. Remodelling For service augmentation lane for future Length RD Length RD 0 requirement 0 M to RD M to RD 860 Length along 860 M = M = 860M Khera drain RD 0 M 860M Width 5 M Kalan to RD860 M = Width 4.25 0.86 7.54 3.00 2.00 4.54 - both side of - - - - - 2.02 Drain 860M M both side drain (Link) Width of drain area 2 x 860x extended area 2 x 5 = 8600Sqm 5 M 860 x 4.25 or 0.86 Ha. area 860 x 5 = = 7310 4300 Sqm Sqm or 0.43 Ha. or 0.73 Ha. Bawan a Drain RD 2.80 1.83 2.45 2.45 2.45 9561M M - - - - - - - - - - 0 M M M to RD Avg 11391 M Remodelling For service augmentation lane for future Length RD 0 Length RD requirement M to RD 2100 0 M to RD Length along M = 2100M 2100 M = Nanglo drain RD 0 M Width 5 M 2100M i Drain to RD2100 M both side of Width 4.25 CD- 2.10 17.50 9.16 2.00 8.34 - - - - - - 4.94 = 2100M drain M both side VII- Width area 2 x of drain 2100m extended 2100x 5 = area 2 x 5 M 21000Sqm 2100 x 4.25 area 2100 x 5 or 2.10 Ha. = 17850 = 10500 Sqm Sqm or 1.05 Ha. or 1.79 Ha. Total Area CD- 145.5 VII 8 Munge sh Pur RD For Drain 21785 m dhalaos( 32.69 8.54 1 m 24.15 (12.70 x 0.50 RD (2 x 5 x to RD 5 x 15 x 21.6 m to m to to m to x 15850 - 21650/10000) 21285 - 15 - - - 40.50 5 10.00 18.76 1.50 1.46 21650/10000) m to =21.65 Ha m(500 x /10000) m m m m =13.74 Ha RD 100/1000 =0.11 37550 0)=5 Ha Ha. m Bazitp For ur dhalaos Drain 8.60 (4.09 x 0.50 x (2 x 5 x 4.47 1.00 5.83 (3 x 15 x RD 0 8.05 m to 8050/10000) - 8050/10000) - - - - - 9.75 m m m 15 m to 12.00 =1.64 Ha =8.05 Ha /10000) RD =0.06 8049[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 837 m Ha. Bawan For a Drain dhalaos 5.30 0.55 (1.50 x RD 0 (4.47 x 0.50 x (2 x 5 x (4 x 15 x 10.8 m to 4.75 0.75 m to 10830/1000 m to 10830/10000) 10830/10000) - - 15 - - - 14.96 3 12.00 m m 7.25 0) RD =2.42 Ha =10.83 Ha /10000) m m =1.62 Ha 9561 =0.09 m Ha. Ladpur Link Drain (1.67 x 0.50 x (2 x 5 x 11.00 2.92 0.30 8.08 RD 0 2.30 2300/10000) - 2300/10000) - - - - - - 2.49 m m m m to RD =0.19 Ha =2.30 Ha 2300 m Katew ara Link Drain (0.60 x 0.50 x (2 x 5 x 2.50 0.60 0.80 1.90 RD 0 1.33 1330/10000) - 1330/10000) - - - - - - 1.37 m m m m m to =0.04 Ha =1.33 Ha RD 1330 m Jatkhor Link Drain 2.75 1.834 0.163 (1.50 x (1.45 x 0.50 x (2 x 5 x RD 0 m to m to 0.30 m to 3760/10000 3.76 3760/10000) 3760/10000) - - - - - - 4.59 m to 3.50 2.587 m 1.66 ) =0.27 Ha =3.76 Ha RD m m m =0.56 Ha 3760 m Nangal Thakra n Link (1.67 x 0.50 x (1.50 x (2 x 5 x Drain 3.64 2.14 1.50 0.90 Dry 900/10000) 900/10000) 900/10000) - - - - - - 1.11 RD 0 m m m =0.07 Ha =0.135 Ha =0.90 Ha m to RD 900 m Madan pur For Drain dhalaos RD (4.85 x 0.50 x (2 x 5 x (3 x 15 x 12.50 9.02 1.00 3.48 4100 4.13 4130/10000) - 4130/10000) - - 15 - - - 5.19 m m m m m to =1.00 Ha =4.13 Ha /10000) RD =0.06 8229 Ha. m For dhalaos (5 x 15 x 15 /10000) Kirari =0.11 Sulem Ha. 0.52 an RD 7.50 (3.66 x 1.0 x (2 x 5 x For all 6.98 2.02 m to 4150 3.70 m to 3700/10000) - 3700/10000) - - services - - - 5.71 m m 8.02 to RD 15 m =1.35 Ha =3.70 Ha (1.50 x m 7850 3700/10 m 000) =0.55 Ha. Total =0.66 Ha Sultan For pur dhalaos Drain 4.20 (1.50 x (2.945 x 0.50 (2 x 5 x (3 x 15 x RD 0 m to 4.57 0.75 8.03 9200/10000 9.20 x 9200/10000) 9200/10000) - - 15 - - - 11.99 m to 12.60 m m m ) =1.35 Ha =9.20 Ha /10000) RD m =1.38 Ha =0.06 9200 Ha. m Rasulp ur Link Drain (0.91 x 0.50 x (2 x 5 x 6.80 3.214 0.30 3.61 RD 0 0.75 750/10000) - 750/10000) - - - - - - 0.78 m m m m m to =0.03 Ha =0.75 Ha RD 750 m Total Area CD- 98.44 VIII Madan 4.10 14.50 11.50 1.00 3.00 (4100 x (2300 x (4100 x 2.00 x RD (4100 + For - (2 x 15 - 14.31838 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] pur (Av.) 3.00)/10000 = 5.00)/10000 5.00)/10000= 900m)(50 2300) x dhalaos x Drain( 1.23 Ha =1.15 Ha 4.10 Ha 0 x 4.25/10000 (3 x 15 x 15)/100 RD 0m 100/1000 =2.72 Ha 15 00= to RD 0)=5 Ha /10000) 0.045 4100m =0.06 Ha(RD ) Ha. 3700 and RD `900) Kirari Sulem an Nagar Drain 4.10 (RD 0m to RD (A) 4100m 9.00 (A) ) m to 6.00 (2 x 15 For x 15) (RD 15.00 11.00 m to RD (4100+ dhalaos /10000 0m to m m (B) 13.00 (2400 x 5.00) (1150 x (4100 + 2400) 2900m) 2700) x (3 x 15 x = 0.045 RD 1.72 to 5.30 1.40 m /10000 5.00) x 5.00 (500 x 4.25 15 - Ha - 13.05 1722m 24.00 m (B) = 1.20 Ha /10000 /10000 100/1000 /10000 /10000) (RD ) m Rcc 9.70 =0.60 Ha =3.25 Ha 0) =2.89 Ha =0.06 1400 Troug m to =5 Ha (RD h 19.70 Ha. and RD 1722m Secti m 1722 ) to RD 1.98 on 1.80 3700m ) (RD 3700m to RD 0.40 1.40 4100m ) Mundk a (1 x 15 Periph x 15) eral (2350 x (2350 x 2.00 x (2350+ x /10000 Drain 5.00) 5.00) 4.25 x 2.00 2.35 2.50 2.00 1.50 0.50 - - - - = 0.023 - 5.55 (RD /10000 /10000 /10000 Ha 0m to =1.175 Ha =2.35 Ha =2.00 Ha (RD RD 850) 2345m ) Ranhol a Pond Drain (RD 1.16 1.20 1.20 1.20 - - - - - - - - - - - 0m to RD 1160m Total Area CD- 32.90 XII 374.1 Total Area FC-II 3 FC-III Supple mentary Drain RD 3.6 16436 6.04 55.00 50.00 5 -- 9.00 12.00 3 6.00 6 - - - 36.00 6 m to RD 22471 m Najafgar h Drain, RD 5.5 25.0 11.82 70.00 45.00 -- 18 24 3 12 12 - - - 69.00 45316 0 0 m to RD 57140m RD Supple RD 0m mentary 0m to to drain RD88 3.6 RD from 1 6.44 61.40 - - - - - 9 Ha. - - - 9 00m 6 8800 RD 0 to =152. m = RD 40 91.0 16436m 0m[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 839 RD RD 8800 8800 m to m to RD RD 9400 - - - - - - - - 9400 m m = = 51.6 113.0 0m 0m RD RD 9400 9400 m to m to RD RD - - - - - - - - 1643 1643 6m = 6m = 123.1 61.7 0m 0m Supple mentary Drain, CD-XI RD 22471m 22.0 2.604 68.30 46.27 - 4 5 - 3 3 - - - 15 to RD 3 25075m RD 25075m 103.0 54.2 0.985 48.72 - - - - - 1 1 to RD 0 8 26060m RD 26060m 125.0 3.6 76.2 2.020 48.72 - - - - - - - - - - to RD 0 6 8 28080m RD 28080m 35.9 3.220 84.67 48.72 4.5 3 - 3 3 13.5 to RD 5 31300m RD 31300m 118.0 69.2 3.200 48.72 - - - - - - - - - - to RD 0 8 34500m 143.5 Total 0 Ha. Total Area 143.5 FC-III 0 FC-IV RD. RD. – – – – – – – – – – – 0m to 0m to – – 12000x30x 12000x12x 12000x25x {4500 12000x15x 12000x10 3000/2 2000 – 1790 6000m 2= 720000 2= 288000 2= 600000 0} 2 = 360000 x2 = 100 Sqm 5m- - 135. Sqm Sqm Sqm Sqm Sqm 240000 Sqm – 200m 126.68 82 Sqm 2000 – to m 4.9 5905x55=3 5905x12x2 5905x25x2 5905X15x2 1475/1 Sqm 325m RD. 0 24775 Sqm =141720 = 295250 = 177150 5905x10x 033 2000 – RD. 6000m 12275x30x Sqm Sqm Sqm 2 Sqm Sqm 1790 to 95.0 2=736500 12275x12x 12275x25x 12275X15x =118100 3068/2 5m to 12000 0 Sqm 2=294600 2=613750 2= 368250 Sqm 148 2000 2018 m- Sqm Sqm Sqm 12275x10 Sqm Sqm 0m- Jheel 15136x30x x2 = Total 150m Portion 117. 2= 908160 15136x12x 15136x25x 15136X15x 245500 3782/2 8000 to RD. 00 Sqm 2= 363264 2= 756800 2= 454080 Sqm 648 Sqm 200m 12000 Total S q m Sqm Sqm Sqm RD. m to 2689435 Total Total 15136x10 19254 2018 17905 Sqm 1087584 Total 1359480 x2 = Sqm Najafgar 0m to m- Sqm 2265800 Sqm 302720 h Drain, 2243 110.00 Sqm Sqm 838.0 45.31 CD-I- 5m- m 7 45316m 250m RD. Total to 17905 906320 300m m to Sqm RD. 30180 2243 m - 5m to 120.00 2818 m 0m - RD. 200m 30180 to m to 250m 45316 RD. m - 2818 98.00 0m to m 3018 0m - 250m to840 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 300m RD. 3018 0m to 3188 0m - 180m to 250m RD. 3188 0m to 3435 0m - 150m to 175m RD. 3435 0m to 3718 0m - 150m to 200m RD. 3718 0m to 3896 0m - 200m to 225m RD. 3896 0m to 4068 0m - 180m to 200m RD. 4068 0m to 4293 0m - 180m to 220m RD. 4293 0m to 4480 0m - 250m to 300m RD. 4480 0m to 4531 6m - 200m to 250m 4200x25x2 4200x12x2 4200x15x2 4200x5x2 Palam 18 to 2.5 22.8 = 210000 5000 1050/7 2000 4.20 37.00 – = 100800 = 126000 = 42000 – 48.75 Drain 10.34 0 3 Sqm Sqm 35 Sqm Sqm Sqm Sqm Sqm Both side 1470x12x2 Palam 10.00 1470x10x2 1470x7.50 1470x5x2 4.50 to 1.3 = 35288 1470x5x2 = 2000 368/25 2000 Link 1.47 (Appr 6.62 = 29400 x2=22050 = 14700 – 12.08 2.25 0 Sqm 14700 Sqm Sqm 7 Sqm Drain ox.) Sqm Sqm Sqm Both side Najaf 17.00 1950x10x2 1950x12x2 1950x7.50 1950x5x2 Garh 0.9 12.5 1950x5x2 = 2000 488/34 1.95 (Appr 4.50 = 39000 = 46800 x2=29250 =19500 – – 15.69 Pond 5 0 19500 Sqm Sqm 0 ox.) Sqm Sqm Sqm Sqm Drain 2900x12x2 Nasirpur 12.00 2900x10x2 2900x7.50 2900x5x2 2.1 =69600 2900x5x2= 3000 725/50 2000 Link 2.90 (Appr 6.50 5.50 = 58000 x2= 43500 =29000 – 23.53 0 Sqm 29000 Sqm Sqm 8 Sqm Drain ox.) Sqm Sqm Sqm Both side 4200x12x2 20.00 4200x10x2 4200x7.50 4200x5x2 Bijwasa 0.9 21.0 =100800 4200x5x2= 5000 1050/7 2000 4.20 to 4.00 = 84000 x2=63000 =42000 – 34.06 n Drain 1 0 Sqm 42000 Sqm Sqm 35 Sqm 30.00 Sqm Sqm Sqm Both side Pankha 3.60 19.60 8.00 2.3 13.8 3600x10x2 3600x12x2 3600x25x2 4000 3600x7.5x 3600x5x2 900/63 2000 – 43.59[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 841 Road to 0 0 = 72000 = 86400 = 180000 Sqm 2= 54000 = 36000 0 Sqm Drain 24.00 Sqm Sqm Sqm Sqm Sqm Both side Shahba d 225x12x2= 225x7.50x 225x5x2= 1.2 12.1 225x5x2=2 1000 2000 Moham 0.23 14.50 2.35 – 5400 Sqm 2=3375 2250 57/40 – 1.64 2 5 250 Sqm Sqm Sqm madpur Both side Sqm Sqm Drain Mudhela 6950x7.50 6950x10x2 6950x5x2 Drain 1.5 11.5 6950x5x2 = 2000 x2 = 1740/1 6.95 16.50 5.00 = 139000 – = 69500 – – 38.72 CD-I- 2 0 69500 Sqm Sqm 104250 200 Sqm Sqm 6920m, Sqm 1056. TOTAL CD-I 13 Ali Drain 2.78 40.45 35.00 4.0 5.00 2780X12X2 2780X10X2 2000 2780X5X 500 500 0 = 66720 = 55600 Sqm. 2=2780 sqm & Sqm. ( Sqm. (6.67 Sqm. (5.56 (0.2 Sqm. 300 0.05 15.34 Hectare) Hectare) Hecta (2.78 Sqm. ( Hectare 5 re) Hectare) 0.085 ) Hectare -- -- ) -- Asola 3.39 2000 5470X7= 5470X5X 500 2000 Drain Av. 5470X12X2 5470X10X2 Sqm. 38290 2=54700 sqm & Sqm. 5470X4= 5.00 De = 131280 = 109400 (0.2 Sqm. (3.8. Sqm.(5.4 300 (0.2 2 to 21880 52.42 Mt. 2 to 5 pth Sqm. Sqm. Hecta Hectare.) 7) Sqm. ( Hectare 5 Sqm. (2.19 5 (Avg.) 3.0 (13.13Hect (27.35 re) Hectare 0.085 ) Hectare) 0 are). Hectare) Hectare ) Molar 1.38 0 to 615 to 2000 1380X7= 1380X5X 500 2000 Bund 615- 1335- 1.5 1380X12X2 Sqm. 9660 Sqm. 2 = 1380 sqm & Sqm. 1380X10X2 Extensio 2.25 2.25 0 to =33120 =27600 (0.2 (0.97 Sqm. 300 (0.2 n Drain 2.2 Nil -- Sqm. Sqm. (2.76 Hecta Hectare) (1.38 Sqm. ( Hectare -- 8.905 5 (3.31 re) Hectare) 0.085 ) Hectare) Mtr. Hectare) Hectare ) Sarita 1.30 20.00 15.00 2000 1300X7= 1300X5X 500 2000 Vihar Sqm. 9100 Sqm. 2=13000 sqm & Sqm. 1300X12X2 1300X10X2 Drain 2.5 = 31200 =2600 (0.2 ( 0.91 Ha) Sqm. 300 (0.2 5.00 -- Hecta (1.30 Sqm. ( Hectare -- 8.415 0 Sqm.(3.12 Sqm. (2.6 re) Hectare) 0.085 ) Hectare) Hectare) Hectare ) TOTAL CD-V 85.09 Munges 10.36 10362x30x 10362x50x 10362x25x 2 10362x20x - 2 0.80 = h Pur 2 137 29.02 3.3 107. 2 = 2 2= Hecta 2 = Hectare Hectare 263.8 Drain 0m to 54 29.02 2 98 621720.00 =1036200 518100.00 re 414480.00 5- CD-XIII- 1575 66 29.02 24.9 Sqm Sqm Sqm Sqm or 82.21 10362m m = 8 or 62.17 or 103.62 or 51.81 41.45 (Avail 1575 36.9 Hectare Hectare Hectare Hectare able m to 8 land) RD. = 6600 181.6 m 4 RD.66 00m to 10362 M Bhupani 8.55 8550x30x2 8550x50x2 8550x25x2 2 8550x20x2 - 2 0.80 = a RD. 90 22 68 = 513000 =855000 = 427500 Hecta = 342000 Hectare Hectare 218.5 Chudani 0m to 65 22 3.0 43 Sqm Sqm Sqm re Sqm or 5- a Drain 2736 22 Un- 5 - or or 85.50 or 42.75 34.20 47.18 (includin m demar 51.30Hecta Hectare Hectare Hectare Availa g RD. cation re ble Haryana 6280 Portion land = portion) m to 171.3 8550 7 M RD.27 36m to 6280 M (Hary ana State) Mudhela 5.60 17.6 6.57 0.9 11.3 5600x15x2 5600x20x2 5600x25x2 2 5600x20x2 - 0.40 0.40 92.40- Drain 1 = 168000 = = Hecta = Hectare Hectare 9.86 CD-XIII- Sqm 224000Sq 280000Sq re 242000Sq Availa From or m m m or 22.40 ble 6950 to 16.80Hecta or or 28.00 Hectare land = 12550m re 22.40Hecta Hectare 82.54 re Nangli 0.93R 1.801 1.801. 1.5 00 930x5x1 = 930x5x1 = - - 930x20x1 - 0.40 0.40 = 3.6 -842 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Sakraw D. 0m .20 20 0 4650 Sqm 4650 Sqm = Hectare Hectare 0.14 ati Link to 385 or 0.47 or 0.47 18600Sqm Availa Drain, RD. Hectare Hectare or 1.86 ble CD-XIII- 1712 Hectare land = RD-0m m to 3.46 to 385m RD.22 = 385m, 62m CD-XIII- RD- 1712m to 2262m = 550m 439.0 TOTAL CD-XIII 1 1580. Total Projected Land Area FC-IV 23 2252. TOTAL AREA (FC-I + FC-II + FC-III + FC-IV) 10 ANNEXURE – II (c) : Detail of Effluent Irrigation System I. Keshopur Effluent Irrigation System (KEIS) The Irrigation Network under Civil Division No. XII also known as Keshopur effluent irrigation system (KEIS) consists of irrigation Channels and Minors and feeder channels spanning across a total length of 30.40 Km to take the effluent treated water from Keshopur Sewerage treatment Plant of Delhi Jal Board, thereafter being supplied by pumping through Keshopur Pump House and Tilangpur Kotla Pump House throughout the year for agricultural land for Irrigation in the Villages Nilothi, Ranhola, Mundka, Tilangpur Kotla, Baprola, Bakkarwala, Dichaonkalan, Hirankudna and Neelwal in Dist. West of Delhi. The total area irrigated is approximately 1630 Acres. A road network comprising of inspection path with cumulative length of approximately 20.00 Km also exist along the irrigation channels and minors to facilitates watch and ward, day to day repair maintenance etc. in r/o the irrigation network which are also being used by local residents for daily commuting. The discharge of 180 cusecs is conveyed and distributed through above Irrigation Network System for irrigating the said agriculture land. II. Coronation Effluent Irrigation System at Burari (CTP) The Irrigation Network under Civil Division No.VII also known as Effluent Irrigation System for Burari Area consists of irrigation Channels and Minors and feeder channels spanning across a total length of 17.37 Km to take the effluent treated water from Coronation Pillar Sewage Treatment Phase-I&II (20 MGD), Phase-III (10 MGD) of DJB, Near Coronation Park of Delhi Jal Board, thereafter being supplied by pumping through Pump House at Burari throughout the year for agricultural land for Irrigation in the Villages Burari, Jharoda, Bhalaswa, Mukundpur, Kadipur, Ibrahimpur in Dist. West of Delhi. The total area irrigated is approximately 325 Acres. A road network comprising of inspection path with cumulative length of approximately 17.37 Km also exist along the irrigation channels and minors to facilitates watch and ward, day to day repair maintenance etc. in r/o the irrigation network which are also being used by local residents for daily commuting. The discharge of 20 cusecs is conveyed and distributed through above Irrigation Network System for irrigating the said agriculture land.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 843 III. Okhla Effluent Irrigation System The Irrigation Network under Civil Division No. V also known as Okhla effluent irrigation system consists of irrigation Channel spanning across a total length of 05.00 Km to take the effluent treated water from Okhla Sewerage Treatment Plant of Delhi Jal Board, thereafter being supplied for Irrigation in the Villages Ali, Mandapur Khadar &Jaitpur in District (South-East) of Delhi. The total area irrigated is approximately 500Acres day-to-day repair maintenance etc. in r/o the irrigation network which are also being used by local residents for daily commuting. The discharge of 20 cusecs is conveyed and distributed through above Irrigation Network System for irrigating the said agriculture land. Conclusion: Due to rapid urbanization in Delhi Territory, thereby the agriculture land area in Delhi is diminishing, therefore, the necessity of remodelling / expansion of above Effluent Irrigation Systems is not envisaged. Key Plan of Effluent Irrigations Systems:844 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ANNEXURE III: SERVICE PLAN - DELHI CANTONMENT BOARD (DCB)[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 845 PERSPECTIVE PLAN FOR INFRASTRUCTURE SERVICE FOR DELHI - 2041 AGENCY: DELHI CANTONMENT BOARD 1. BACKGROUND - DELHI CANTONMENT BOARD The administration of Delhi cantonment is carried out through a Board, which has 16 members, out of which 08 are nominated/ Ex-officio members and 08 members are elected by the public residing in civil as well as military area. The civil and military populations reside in different pockets in the cantonment. The needs and challenges of both pockets differ from each other in respect of solid waste management. Basic information about Delhi Cantonment Board is mentioned below: S. No. Item Details 1 Year of establishment 1914 2 Total Area 10452 Acres 3 Total Population (Census 2011) 1,10,351 4 No. of wards 08 5 Commercial areas 02 6 Urban Villages 06 7 Schools 16 8 Slums 02 9 Length of Roads 50.60 km 10 Hospital/ Dispensaries 04 11 Parks 17 2. SOLID WASTE GENERATION IN DELHI CANTONMENT BOARD 1 SOILD WASTE GENERATION - Current status S. NO Item Details 1 Total solid waste generated per day 68 MT 2 Waste generated from civil area per day 23 MT 12 MT Dry waste 11 MT Wet waste 3 Waste generated from Army area per 45 MT 24 MT Dry waste day 21 MT Wet waste846 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 4 Total Dry waste processed per day in 30 MT waste to energy Plant at Okhla 5 Wet waste processed per day in waste to 07 MT energy plant at Okhla 6 Waste dumped in Landfill site at Okhla 31 MT per day CIVIL AREA - Current status 1. The Household waste is segregated into wet & dry streams at source. Approx. 95% segregation at source has been achieved so far. 2. All the waste collected from civil area is transferred to different Waste Transfer Centers (WTCs). 3. All the WTCs have been designed for the temporary storage of dry & wet waste, as separate fractions. 4. Rag pickers have been integrated into the system to pick up recyclable items, from the waste collected at the WTC’s. 2 ACTION PLAN FOR SEGREGATION AT SOURCE - MUNICIPAL SOLID WASTE CIVIL AREA ARMY AREA It is estimated that Municipal Solid Waste The population of army area is mostly likely to be generated from civil area by comprised of army troops. Therefore, it is 2041 will be 37 MT per day. The challenge estimated that there will be no difference in before the Board is to maintain the level of the quantity of Municipal solid waste source segregation in civil area. For this, generated today and which is likely to be the following exercise is being undertaken generated in 2041. on regular basis: a. A system is being worked out for on-site a. Two sanitary guides accompany the composting of food waste generated by door-to-door collection vehicle, they transit camps, officer’s messes, make announcement and make sure community kitchens of army units and that only segregated waste is institutes. collected. b. Further, it is proposed that army b. A register is maintained to keep a authorities will be asked to install de- check on those residents who are not centralized compositing machines. This handing over segregated waste. The step shall considerably reduce the repeated offenders to be penalized problem of segregation at source, which according to the provisions of Delhi in turn would lessen the amount of non- Cantonment Board solid waste recyclable waste being transported to the[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 847 Management Bye-Laws. landfill site at Okhla. c. Regular interaction with residents and c. It has been decided that station awareness campaigns in the form of headquarters and Delhi Cantonment street play, mohalla meeting etc. is Board will sensitize RWAs, existing in the organized to keep the residents aware army area, to segregate and process the and motivated on source segregation. wet waste in their own compound. d. Formal training is being imparted to Rag pickers/ Safaiwalas to improve the level segregation on monthly basis. The rag pickers were issued separate I- cards and have been successfully integrated into the system. 3 MUNICIPAL SOLID WASTE COLLECTION CIVIL AREA ARMY AREA For civil area, 14 door-to-door vehicles are For Army area, 27 vehicles have been deployed for collecting both dry and wet deployed to collect the solid waste. Separate waste, which is segregated at household bins have been provided for dry and wet level. These vehicles have been suitably waste. The waste collected from the army modified to carry the solid waste in area is directly taken to the processing plant segregated form. A few salient aspects of and landfill site at Okhla. door to door collection are as under: a. All vehicles have been fitted with tracking system (GPS) b. Announcement system with specific message for segregation has been incorporated. c. The staff has been deployed ward wise for the collection of segregated waste at source. d. The mobile numbers of the staff have been made public to ensure transparency and commitment of Delhi Cantonment Board.848 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 3. MANAGEMENT STRATEGY 3.1. DETAILS OF SORTING AND MATERIAL RECOVERY FACILITY There are eleven secondary storage points, with the facility of separate storage of dry and wet waste, within the territorial jurisdiction of Delhi Cantonment Board. Out of this, one secondary storage point at Tigris Road has been converted into sorting and material recovery facility with capacity to handle 30 MT waste daily. Further, rag pickers have been integrated into the system to pick up recyclable items, from the waste stored at Tigris Road. Accordingly, two more material recovery facilities will be developed to meet the need, which will arise in 2041. 3.2. DETAILS OF PROCESSING OF SOLID WASTE All the waste after collection is moved to waste transfer centers, where the recyclable waste is retrieved. Therefore, the solid waste is carried by respective vehicles to Okhla. On average, approximately 30 MT of dry waste and 7 MT of wet waste are disposed in the Waste to Energy and Waste to Compost plants respectively. The processing of waste at Okhla is done under the management of South Delhi Municipal Corporation. Only 31 MT of solid waste is being dumped at the landfill site at Okhla. 100% of solid waste, which is generated in Delhi Cantonment, is either processed or dumped at the landfill site, on a daily basis. A pilot project exclusively for the processing of food waste generated from market area, with a total capacity of 175 Kg, is fully functional for the last 2 years in the WTC at Tigris Road. It is also proposed that 4 to 5 sorting- cum- compositing machine, with a capacity of 10 MT each will be installed at different locations, within 4 years, to handle the wet waste generated within the territorial jurisdiction of Delhi Cantonment Board. 3.3. DETAILS OF MANAGEMENT OF PLASTIC WASTE There is a complete ban on the use polythene bags of less than 50-micron thickness. The Assistant Sanitary Inspectors keep a regular check in market area and also impose fine if someone is found in violation. A committee has also constituted to identify and replace specific items of non- biodegradable plastic like plastic straw, plastic spoon disposable plastic glass, plastic plates etc. with biodegradable items. These processes of replacement of non- biodegradable plastic items have been successfully achieved in Gopinath Bazar & the committee keeps visiting the commercial areas for ensuring that people and shop keeper get habituated for such practice.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 849 A baling machine has been installed in the waste transfer centre at Tigris Road, for making bales of plastic and polythene waste material, for ease of handling/ disposal through the rag pickers. 3.4. DETAILS OF MANAGEMENT OF HORTICULTURE WASTE A total of 17 parks of various sizes are being maintained in the Cantonment area. All the parks have been provided with pits for collection of horticulture waste. The horticulture waste is further carried to the nearest shredding machine, four of which have been installed in different areas of the cantonment. The shredded horticulture waste is converted into compost in the natural process, duly augmented with the spray of appropriate quantity of EVM. The compost generated is being utilized within its geographical limits. 3.5. DETAILS OF MANAGEMENT OF CONSTRUCTION AND DEMOLITION (C&D) WASTE a) On an average up to 1.0 metric tons of C&D, waste is generated in Delhi Cantonment area, on daily basis. b) A central storage facility for C&D waste has been created in Jharera village for temporary holding of the same before further disposal. c) The C&D waste is transported from the central storage facility to the processing facility setup at Shastri Park by IL&FS, under the management of EDMC. d) Explicit directions have been issued to all contractors working under Delhi cantonment Board, as well as Military Engineering services (MES), to follow the above procedure for the disposal of C & D waste. e) Vulnerable areas have been put under CCTV surveillance to prevent dumping at unauthorized sites. f) Punitive action is promptly taken against the defaulters.850 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ANNEXURE IV: SERVICE PLAN - EAST DELHI MUNICIPAL CORPORATION (EDMC)[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 851 PERSPECTIVE PLAN FOR INFRASTRUCTURE SERVICE FOR DELHI - 2041 AGENCY: EAST DELHI MUNICIPAL CORPORATION 1. MUNICIPAL SOLID WASTE MANAGEMENT (MSWM) Aspect Information required Generation Presently – 2600 TPD By 2040 – 6000 TPD Present estimations of Green waste – 1300 TPD Dry waste – 30 % and inert – 20% By 2040 Green waste – 3000 TPD Dry waste – 30 % and inert – 20% Management Separate management plans (collection, segregation and processing) for: strategy  Green Waste  Reusable Waste  Inert EDMC outsourced door-to-door collection of segregated waste collection and expected to achieve segregated collection by March 2021 and processing 2000 TPD- integrated facility at Ghonda Gujran by 2022. 1200 TPD - waste processing through bio - methanization. Management plans to include information regarding the following aspects: 1. Improving collection, segregation efficiency at local level (RWA/Mohalla/Market association/Solid waste zone/Wards etc.) EDMC has outsourced collection and transportation of Municipal Solid waste and Street Sweeping waste and any other solid waste specified by East DMC from time to time as per MSW Rules 2016. Broadly the work includes primary collection and transportation of Municipal solid waste (MSW) and street sweeping waste in segregated manner from852 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] households, slums, informal settlements, commercial, institutional and other non- residential premises, multi storied buildings, large commercial complexes, malls, housing complexes. 2. Maximizing wet waste processing (e.g., Composting, Bio-methanation etc.) locally  Decentralized accelerated compositing, presently, 10 numbers of 1 TPD capacity are operational and 02 plants of capacity 1 TPD are under progress  Home composting – 50 TPD  Decentralized Bio-methanation – 5 TPD (02 in numbers are operational), 10 TPD (01 in number is in progress)  Target: Decentralized accelerated compositing, 20 numbers of 1 TPD  Decentralized Bio- methanation, 10 numbers of 5 TPD  1 Material Recovery Facility (MRF) in each ward i.e. 64 numbers  Centralized Bio-methanation – 1200 TPD by September 2022 (a joint venture company is already been formed with NTPC) 3. Improving sorting and material recovery (MPD will recommend re- purposing of dhalao as material recovery facilities at the decentralized level) etc.  EDMC propose 01 MRF centre in each ward deals with recyclable material under process.  Details of existing/ proposed processing facilities on already allotted land. Shastri Park C & D Plant- 1000 MT- operational Vinod Nagar Workshop/ Parking - operational Geeta Colony Workshop/ Parking - operational Singhola Disposal of silt- operational (Narela) 4. Reclamation of landfill sites and reuse/recycle of legacy waste  Action plan for clearing legacy waste at Gazipur dumpsite is attached herewith as Annexure – IV (a).  After reclamation, land will be used for Technology Park showcasing[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 853 all the technologies of wet waste processing and recycling of waste. 5. Conversion of existing landfills to engineered/scientific landfills  There is no such type of proposal, however, whenever land is provided that will be constructed as engineered/ scientific landfills. Special plans for: Integration of informal sector in core SWM system (for improved management vis-a-vis ensuring safety, hygiene and healthy work conditions for the workers). EDMC to establish a system to recognize organizations of waste pickers or informal waste collectors and promote and establish a system for integration of these authorized waste pickers and waste collectors to facilitate their participation in solid waste management including door to door collection of waste. Marketing strategies for compost and other reusable/recycled products As there is less amount of compost produce from plant, the whole quantity of compost is being utilized in, Municipal parks and gardens generated from waste in EDMC area. There shall also be a provision for the households to directly deposit or sell their recyclable waste to Kabadiwala/ secondary market and deposit sales realizations in ESCROW account of EDMC and this amount of EDMC and this amount will be used for payment of collection of garbage. Awareness, capacity building and behavioural changes programs Annexure – IV (b) Other information Key infrastructure or special projects proposed for the plan period, along with details of projects and their timelines 2000 TPD Integrated facility waste management and Energy Generation facility will be developed at Ghonda Gujran by September 2022 as a JV between NTPC & EDMC Details of existing/ proposed processing facilities on already allotted land is attached as Annexure – IV (c) Future land requirement (if any) for scientific (engineered) landfill sites, provided only inert are to be dumped Land is required for Engineered/ Scientific Landfills, in future. At Sonia Vihar 100 acre of land is required for disposal of reject/ inert of capacity 200 TPD for 20 Years. This land belongs to DDA.854 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 2. Key targets that will be included in MPD 41 Action Plan: Component Curren Targe Phasing Plan t status t for 2041 MSW collection 100 % 100% Nil efficiency MSW 25 % 100 Settlemen 20 % 50 % 80 % segregation % t Pattern (To be (To be (To be efficiency accomplished accomplished accomplished ) ) ) CGHS September Dec, 2021 March, 2022 and Bulk 2021 generator s Planned September Dec, 2021 March, 2022 Colonies 2021 Un- September Dec, 2021 March, 2022 planned 2021 colonies JJ September Dec, 2021 March, 2022 Clusters 2021 Percentage of 10 % 100 green waste % In first year – 10% processed (e.g. In the 5th year- 25% composted or In the 10Th year – 100% any other processing method) locally Percentage of - 100 recyclable % In first year – 15% waste sent to In the 5th year- 50% recycling In the 10Th year – 100% centres/industr y[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 855 Identification List of informal waste workers / Kabadiwalas prepared and listing of informal waste workers and units (recyclers, kabariwalas, rag pickers etc.) Percentage of 10 % 100 March - 2022 identified % informal waste workers and units integrated with the formal MSW management plan Reduction in 50 % 90 % By September - 2022 waste going to land fill sites Reclamation of 140 MT as per action plan attached land fill sites (greening and processing of legacy wastes)856 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Annexure – IV (a) : ACTION PLAN FOR CLEARING LEGACY WASTE AT GHAZIPUR DUMP SITE East Delhi Municipal Corporation in maintaining a Sanitary Land Fill (SLF) near NH-24. This SLF site is spread in about 70 acres of Land. About 2000-22090 MT fresh MSW is received daily and about 3000, MT (as an average) of legacy waste is being processed daily. About 3.00 lac MT of legacy waste has been processed at SLF Ghazipur dumpsite. Time line to clear legacy waste of 140.00 lac MT is as follows:[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 857858 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Annexure – IV (b) : AWARENESS, CAPACITY BUILDING AND THEIR TIMELINES[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 859860 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)][भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 861 Annexure – IV (c) : DETAILS OF EXISTING/PROPOSED PROCESSING FACILITIES ON ALREADY ALLOTTED LAND862 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)][भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 863864 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ANNEXURE V: SERVICE PLAN - SOUTH DELHI MUNICIPAL CORPORATION (SDMC)[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 865 PERSPECTIVE PLAN FOR INFRASTRUCTURE SERVICE FOR DELHI - 2041 AGENCY: SOUTH DELHI MUNICIPAL CORPORATION 1. MUNICIPAL SOLID WASTE MANAGEMENT IN SDMC: Aspect Information Required Generation Approx. 7000 TPD in 2040-41 Estimated green waste- (biodegradable waste): @36%= 2520 TPD Estimated dry waste: @34% = 2380 TPD (Reusable waste paper, textile, plastic and rubber) Inert material @30% = 2100 TPD) Management (Collection, segregation and processing) strategy Door to door collection, segregation of green waste (biodegradable waste) and reusable waste though concessionaires and involvement of waste pickers in all four zones of SDMC. Green waste is being processed at Compost Plant Okhla, decentralization bio-methanation plants and through home composting. Inert (C&D waste) is collected in two zones 8t ward level through concessionaires/private contractors and the same is being processed at Bakarwala C&D waste plant and proposed C&D waste plant. Another .C&D waste processing facility is proposed at Maidan garhi/Tehkhand for South zone and Central zone. (Improving collection and segregation efficiency) RWA/ Mohalla/ Market association/ Solid waste zone/Wards etc.) Improving collection, segregation efficiency at ward level by awareness through public notices in newspapers, distribution of pamphlets, radios, nukkad nataks, education in schools, and interaction with RWAs through concessionaries by involvement of waste pickers. Interaction with RWAs through concessionaires by involvement of waste pickers. Wet waste is processed through composting at Compost plant, bio- methanation plants and decentralization composting at ward level. Three, 1 TPD and 5 TPD plants are presently functioning. One, 1 TPD and 5 TPD are under construction. However, such plants are proposed subject to availability of hand. Further, ward composting has been started locally through pits. Material Recovery Facility (MRF) to be setup at ward level for sorting of waste material at FCTS/Dhalaos. Some dhalaos where is possible will be used as material recovery facilities at ward level. Reclamation of landfill site at Okhla (dumpsite) is being done through bio mining of legacy waste. Reuse/Recyclable of legacy waste is being utilized is as under: - Refuse Derived Fuel (RDF): - Waste to Energy plant Okhla and private industries. Inert: - NTPC Eco park and Tajpur pit. C&D waste: - At SLF Okhla to cover the dumped waste and making of approaches.866 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] After completion of bio-mining/remediation of legacy, waste at existing SLF Okhla (dumpsite) will be converted into Engineered/Scientific Landfill/solid Waste Management facility. Establishing the system to recognize organizations of waste pickers and Establish a system for integration of the various waste pickers to facilitate their participation in solid waste management including segregation and door-to- door collection of waste through concessionaires ensuring safety, hygiene and healthy working conditions for the workers. Marketing of compost is being done through concessionaires of composite plant. Regarding other reusable/recycled products is being done through departmental as well as contractors and private participation. Awareness, capacity building and behavioural changes programs is being done through concessionaire as well as sanitation officers of department. Key 1. One Compost Plant Okhla, having capacity of 200 MT of MSW per day for infrastructure or making compost is being operated by concessionaire, M/s IL&FS. special projects 2. One waste to Energy Plant at Okhla having capacity of 1950 MT of MSW Proposed for per day to produce 23 MW of power is being operated by concessionaire. the plan period, 3. Another Waste to Energy Plant at Tehkhand having capacity of 2000 MT along with of Solid waste per day to 25 MW of power is under construction. This details of plant is likely to be functional in 2022. projects and their timelines. 4. Engineered Sanitary landfill at Tehkhand is to be developed up to Dec 2022. 5. Plant for processing of Refuse Derived Fuel (RDF) Tehkhand will be setup by Indian Oil corporation and NTPC. 6. Plan for processing of plastic waste at Tehkhand will be setup by Indian Institute of Petroleum Research (IIPR). 7. A 200 TPD material recovery facility is proposed at Tehkhand/Okhla under PPP model. Future land Future land requirement has been prepared and the same is annexed herewith requirement (if as annexure V (a). any) for Scientific (engineered) landfill sites, provided only inert are to be dumped. 2. Targets to be included in the MPD-2041: S.no Component Current status Target for 2041 Phasing plan 1 MSW collection MSW collection in some Door to door, 90% up to 2021 efficiency areas is being done collection of and 100% up to through MSW in entire 2025 Subject to the concessionaires by area of SDMC availability of funds involvement of waste will be done and lands. pickers in all four zones through of SDMC. concessionaires by involvement of waste pickers.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 867 2 MSW segregation MSW segregation in Segregation of 90% up to 2021 efficiency some areas is being MSW in entire and 100% up to done through area of SDMC 2025 Subject to the concessionaires by will be done availability of funds involvement of waste through and lands. pickers in all four zones concessionaires of SDMC. by involvement of waste pickers. 3 Percentage of 10% of green waste is 100% of green 25% up to 2021 green waste being processed at waste 50% up to 2023 biodegradable Compost Plant Okhla, (biodegradable bio-methanation plants, waste) will be 75% up to 2025 (e.g., composters, compost processed at composted or 100% up to 2030 pits etc. at ward level. compost plants, any other Subject to the bio- processing availability of funds method) locally methanation and lands. plants, composters, compost pits etc. at ward level. 4 Percentage of About 10% of 100% of 25% up to 2022 recyclable waste recyclable waste is recyclable waste 50% up to 2023 sent to recycling being sent to recycling will be sent to centres/industry centres/industry through recycling 70% up to 2025 waste pickers and centres/industry 100% up to 2030 private participation. through waste Subject to the Pickers and availability of private funds and lands. participation. 5 Identification Identification and listing 100% 25% up to 202 l and listing of of informal waste Identification 50% up to 20 3 informal waste workers and units and listing of workers and integrated with the informal waste 75% up to 2025 units integrated formal MSW workers and 100% up to 2030 with the formal management plan is units integrated Subject to the MSW being done through with the formal availability of management concessionaires in all MSW funds and lands. plan four zones of SDMC. Management plan will be done through concessionaires in all four zones of SDMC. 6 Reduction in Efforts are being done Likely to be 80% up to 2023 waste going to in reduction of waste done in 2030. 100% up to 2030 land fill sites going landfill site Subject to the through proce5sing of availability of waste at card level and funds and lands. setting up of new Waste to Energy Plants, decentralized, composting.868 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 7 Reclamation of Reclamation of landfill Likely to be 100% up to 2030 land fill sites site at Okhla (dumpsite) completed in Subject to the (preening and is being done though 2030. availability of processing of bio mining of legacy funds and lands. legacy wastes) waste. Thereafter this land will be converted into green/used for setting up Solid Waste Management facilities. ANNEXURE – V (a) REQUIREMENT OF LAND AGAINST THE 1500 ACRES AS PER PROVISION IN DELHI MASTER PLAN 2021 FOR IMPLEMENTATION OF SOLID WASTE MANAGEMENT FACILITIES IN DIFFERENT LOCATIONS IN ALL FOUR ZONES OF SDMC :- Sr. Name of Facilities Facilities Approx. Approx. Approx. No. facilities available required Land Land Remaining (In nos.) (In nos.) required available land (in (in sqm. required sqm. /acres) /acres) (in acres) 1 Community 92 102 102x300 = 92x 250 1.80 Bins/ 30600 sqm. sq.m or 5.7 Receptacles/ Or 7.5 acres acres (FCTS/PCTS) 2 Material Nil 2x4=8 8x2=16 Nil 16.00 Recovery acres Facilities (MRF) 3 Facilities for Nil 2x4=8 8x1=8 acres Nil 800 Kabariwala 4 Attendance 30 1x74= 74 74x100 Nil 1.82 Office for =7400 sqm SI/ASI or 1.82 acres Training 1x4=4 4x600= Nil 0.60 5 Centre Nil 2400 sqm. facilities for or 0.6 acres waste pickers and SDMC staff 6 Workshops 2 4x4=16 4x4=16 8.0 acres 8.00 and parking acres[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 869 space for vehicles engaged in Solid Waste Management. Processing 1 2 67+425= 67 acres 425.00 7 Disposal of 492 Solid Waste, acres C&D waste and Residue 8 Disposal of 2 10+300=310 10 acres 300.00 inert like soil acres fine fraction etc. 9 Processing/ Nil 4 4x2=8 acres Nil 8.00 disposal of Plastic waste Total 859.92 90.70 acres 769.22 acres acres870 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ANNEXURE VI: SERVICE PLAN – NORTH DELHI MUNICIPAL CORPORATION (NORTH DMC)[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 871872 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] PERSPECTIVE PLAN FOR INFRASTRUCTURE SERVICE FOR DELHI - 2041 AGENCY: NORTH DELHI MUNICIPAL CORPORATION 1. MUNICIPAL SOLID WASTE MANAGEMENT (SWM) IN NORTH DMC ASPECT INFORMATION REQUIRED GENERATION Total MSW: 9,000 TPD [assuming population of North DMC 1.80 crore (out of total population of Delhi: 4 crore in 2041)] Present MSW Generation is 4500 TPD Green (wet) waste: 3,600 TPD (Bio-degradable) Dry waste: 5,400 TPD (Non Bio-degradable) MANAGEMENT Present status of SWM is as under: STRATEGY Present population of area under the jurisdiction of North DMC is about 90 lacs having about 18 lacs residential units. At present, about 4500 TPD of Municipal Solid Waste (MSW) is generated and collected in six zones per day. Out of which, about 2300 TPD of MSW is collected from Keshav Puram, Civil Lines & Rohini Zones which is collected, processed and disposed off scientifically as per SWM Rules-2016 at Waste Processing Facility/ Waste to Energy (WTE) Plant at Bawana in Narela. The remaining 2200 TPD waste collected from City-S.P, Karol Bagh & Narela Zones is being dumped at Bhalswa landfill site without processing/ treatment. As such there a gap of 2200 TPD of MSW which needs to be addressed and processed. Per capita per day solid waste generation is 0.50 kg (500 gm). In order to ensure scientific disposal of the aforesaid remaining MSW, North DMC has planned to set up another WTE Plant either at Bhalswa SLF site or at Rani Khera in Narela. In pursuance of the matter, an MoU between Indian Oil Corporation Ltd. (IOCL) and North DMC has been signed on 19.1.2021 to set up an Integrated Waste to Energy Facility in the jurisdiction of North DMC by processing of the Municipal Solid Waste. Accordingly, long term tender incorporating provisions of SWM Rules, 2016, for collection & transportation of MSW for remaining three zones i.e. City-S.P, Karol Bagh & Narela Zones have been invited. Management Plan for Solid Waste Management: 1. About 55% of solid waste generated in the jurisdiction of North DMC is being processed & inerts are also disposed off scientifically at Narela- Bawana Waste Processing Facility. Salient features of this project/ agreement are as under:  It is a long term 20 years agreement based on PPP model executed on 17.7.2009  It is an integrated contract for end to end solution of solid waste which includes door-to-door collection (primary), transportation from secondary storage depots to the Narela-Bawana Waste Processing Facility, processing (compost &R DF), WTE Plant and disposal of inerts at engineered landfill site.  WTE Plant of 24 MW capacity is also operational.  Contract is valid upto year 2029.  Concession area comprises of 64 mpl. Wards (out of total 104 mpl. wards)[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 873  At present, about 2400-2500 MT of solid waste is received at this plant & by 2029, waste generation is expected to be 3500TPD.  Regular awareness programs through IEC activities etc. are carried out for reduction, re-use & recycle (3Rs) as well as emphasis is given on segregation of waste at source to improve the SWM. Ultimately, it will reduce the load on the Processing Facilities/ landfill sites. The residents are also made aware for utilising waste as wealth through household/ local composting. 2. For remaining waste (45 % ), an MOU has been signed between Indian Oil Corporation Ltd. (IOCL) and North DMC has been signed on 19.1.2021 to set up Integrated Waste to Energy Facilities in the jurisdiction of North DMC by processing of the Municipal Solid Waste at Rani Khera. Likely date of commissioning of this plant is Dec., 2022. 3. On pilot basis, decentralised bio-methanation/ compost plants of 5TPD (4 NOS.) & 1TPD (6 NOS.) are being installed under the jurisdiction cf North DMC, out of which 2 nos. 5TPD & 3 nos. 1TPD plants are operational. On the basis of success story, these plants would be replicated in all 104 municipal wards. For installation of these plants, adequate land is also required specifically meant for this purposes. Provision of land for solid waste management shall be duly earmarked in the proposed layout plans before notification. 4. 50 TPD recyclable plastic waste processing plant/ facility has also been proposed at Tikri Kalan in Narela. For which, RFP/ tender document is being prepared. 5. Land requirement for various activities for solid waste management upto the year 2041 is annexed as "Annexure – VI (a)". 6. 200 TPD Bio-methanation gas plant based on cow dung is under construction at Bhalswa Dairy and which is likely to commence operation by 31.12.2021. 7. Material Recovery Facility (MRF) having capacity of 4 TPD for sorting of recyclable materials such as paper, plastic, metal, glass etc. will be commissioned at Zakhira shortly. Similar MRFs are proposed in each ward depending upon the availability of land. Minimum land requirement is 1000 sqm for setting up of an MRF. 8. Remediation of legacy waste from SLF Bhalswa, which' is in operation since 1994, is being carried out. Out of total 80 lac MT of legacy waste, 11.90 MT has been bio-mined through trammels. Reclamation of the land is likely to be completed by June, 2022. 2. Key targets that will be included in MPD-2041 Action Plan: Component Current Status Target for 2041 Phasing Plan MSW collection efficiency 100% 100% N.A. MSW Segregation efficiency 55% 100% By 31.12.2023 Percentage of green waste 55% of 1800 TPD processed (e.g. composted or 100% of 6,000 = 990 TPD By 31.12.2023 another processing method) TPD . ' Say 1000 TPD locally874 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Percentage of recyclable waste sent to recycling centres/ 50% 100% By 31.12.2023 industry 25% by Dec, 22 Identification and listing of 839 nos. of informal waste workers and informal waste 50% by Dec, 24 100% units (recyclers, kabariwalas, workers 75% by Dec, 26 rag pickers etc.) identified 100% by Dec, 30 Percentage of identified informal waste workers and units --- --- As above integrated with the formal MSW management plan Reduction in waste going to 25-30% 80% 5% in every 5 years land fill sites Reclamation of land fill sites ONE no. at (greening and processing of --- By June, 2024 Bhalswa legacy wastes)[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 875 Annexure – VI (a) Land requirement for various activities for solid waste management up to 2041:876 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)][भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 877 ANNEXURE VII: SERVICE PLAN – NEW DELHI MUNICIPAL COUNCIL (NDMC) PERSPECTIVE PLAN FOR INFRASTRUCTURE SERVICE FOR DELHI - 2041 AGENCY: NEW DELHI MUNICIPAL COUNCIL (NDMC) Consider the following approximate population projections for New Delhi Municipal Council: At present, the fixed population of New Delhi Municipal Council is 2.67 Lakh as per 2011 census. Low Growth Scenario Medium Growth Scenario High Growth Scenario 3 lakhs 3.2 lakhs 3.5 lakhs The service action plan for master plan of management of Solid Waste of New Delhi Municipal Council for 2041 is as under:878 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 1. MUNICIPAL SOLID WASTE MANAGEMENT (SWM) IN NORTH DMC ASPECT INFORMATION REQUIRED GENERATION Total MSW likely to be generated 350 – 400 MT Estimates of green waste, dry waste 100 MT Wet waste (reusable waste and inert material) 250 -300 MT Dry waste MANAGEMENT Separate management plans (collection, STRATEGY segregation and processing) for; Green Waste Green waste — Organic waste convertors, Home Composting, compost pits, Biogas Plant and compost plant Okhla (for 100 MT Wet Waste} Reusable Waste Reusable Waste — 25 MT for recycling (NGOs and recyclers) Inerts Inert — Sent to SDMC landfill site from Waste to Energy Plant, Okhla Management plans to include information regarding the following aspects; Improving collection, segregation efficiency Door to door collection of at local level (RWA/Mohalla / Market waste and its segregation as Association / Solid Waste Zone/ wards per the Solid Waste etc.) management Rules 2016 i.e., Wet Waste, Dry Waste and Domestic Hazardous Waste. Maximizing wet waste processing (e.g., Already explained above. Composting, bio-methanation etc.) locally Improving sorting and material recovery Segregation of waste in situ (MPD will recommend repurposing of and also construction of dhalaos as material recovery facilities at Material Recovery facility for the decentralized level) etc. micro segregation of dry waste. Reclamation of landfill sites and reuse/ Does not pertain to New Delhi recycle of legacy waste Municipal Council Conversion of existing landfills to Does not pertain to New Delhi engineered / scientific landfills Municipal Council Special plans for; Integration of informal sector in core SWM Already integrated and system (for improved management vis-a- providing the mentioned vis ensuring safety, hygiene and healthy conditions. work conditions for the workers. Marketing strategies for compost and other The compost produced shall reusable / recycled products). he used in horticulture department of NDMC itself.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 879 The reusable / recyclables shall he handed over to authorized recyclers. Awareness, capacity building and Already are being run by behavioral changes programs. NDMC in full swing. The capacity and behaviors changes are being evaluated from time to time. 2. Key targets that will be included in MPD-2041 Action Plan: Component Current Status Target for 2041 Phasing Plan MSW collection efficiency 100% 100% N.A. MSW Segregation efficiency 100% 100% 100% Percentage of green waste processed (e.g., composted 100% 100% 100% or another processing . ' method) locally Percentage of recyclable Increase by 10% per waste sent to recycling 20% 100% year centres/ industry Identification and listing of informal waste workers and 100% (already 100% 100% done units (recyclers, kabariwalas, done) rag pickers etc.) Percentage of identified informal waste workers and units integrated with the 100% 100% 100% done formal MSW management plan Does not pertain Does not pertain Does not pertain to Reduction in waste going to to New Delhi to New Delhi New Delhi Municipal land fill sites Municipal Municipal Council Council Council Does not pertain Does not pertain Reclamation of land fill sites Does not pertain to to New Delhi to New Delhi (greening and processing of New Delhi Municipal Municipal Municipal legacy wastes) Council Council Council880 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ANNEXURE VIII: SERVICE PLAN – DEPARTMENT OF ENVIRONMENT, GNCTD AND DELHI POLLUTION CONTROL COMMITTEE (DPCC)[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 881 PERSPECTIVE PLAN FOR INFRASTRUCTURE SERVICE FOR DELHI - 2041 AGENCY: DEPARTMENT OF ENVIRONMENT, GNCTD AND DELHI POLLUTION CONTROL COMMITTEE 1. SERVICE PLAN FOR NON-MUNICIPAL SOLID WASTE MANAGEMENT IN DELHI FROM DEPARTMENT OF ENVIRONMENT AND DPCC: Aspect Information required Generation Estimates of C& D Waste: Current Status FY 2020-21 (Million MT) : 1.38* (3781 TPD) Target for 2041 (Million MT): 3.66** (10,027 TPD) *Estimation of C&D waste generation in Delhi, as per NITI Aayog Report Jan 2019 ―Strategy on Resource Efficiency in Construction & Demolition Sector‖ – 4,600 MT/day (1.38 million ton per annum) ** Considering 5% annual growth of C&D waste generation in NCT of Delhi Bio-Medical Waste: As per gap analysis study got done in 2020 for requirement of numbers & capacities of additional Common Biomedical Waste Treatment & Disposal Facilities (CBWTFs) in Delhi estimated total future biomedical waste generation in 2031 = 80000 kg/day. As per Central Pollution Control Guidelines dated 21.12.2016, prior to allowing any new CBWTF, prescribed authority {Delhi Pollution Control Committee (DPCC) in case of Delhi} is required to prepare an inventory or review with regard to the bio-medical waste generation at least once in 5 years in the coverage areas of the existing bio-medical waste treatment and disposal facility. Prescribed authority is also required to extrapolate the coverage area wise bio-medical waste generation for the next 10 years. E- Waste: No concrete data available. E-Waste Inventorisation exercise is proposed. Plastic Waste generation : 1500 MT/D Management Management plan for C& D Waste: Strategy Processing Capacity of Operational C&D Plants in Delhi (4150 TPD)  Jahangir Puri (Burari) – 2000 TPD  Shastri Park – 1000 TPD  Rani Khera (Mundka) – 150 TPD  Bakkarwala – 1000 TPD (C&D Waste received at 4 processing facilities in Delhi : 3151 TPD)882 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Proposed C&D Waste Processing Facilities in Delhi (2500 TPD)  Ranikhera – 1000 TPD (Under Construction)  Maidangarhi - 1000 TPD  Libaspur - 500 TPD (Land use to be changed by DDA) NCT of Delhi will require creation of additional annual processing capacity of 2 Million MT (5479 TPD) by 2041 as below: By 2026 – 0.5 Million MT (1370 TPD) By 2031 – 0.5 Million MT (1370 TPD) By 2036 – 0.5 Million MT (1370 TPD) By 2041 – 0.5 Million MT (1370 TPD) Bio-Medical Waste: For obtaining the authorization mandatory under Bio-Medical waste Management Rules, 2016, every health care facility is required to enter into an agreement with the concerned CBWTF for collection, transportation, treatment and disposal of the waste generated by it. Biomedical waste is collected, transported and treated by two Common Biomedical Waste Management Facilities (CBWTFs) operating in Delhi. In view of expiry of lease of one of the CBWTFs presently operation on land provided by Directorate of Health Services, Govt of NCT of Delhi, the DPCC has called Expression of Interests for bringing up two new CBWTFs on privately owned land for catering to the BMW generation in two regions to cater future generation of biomedical waste in next 10 years i.e. year 2031 Region 1: Shahdara, East and North East Delhi (fall in the trans Yamuna belt). Region 2: West, South West, Central Districts. E- Waste:  Delhi consisting of 11 districts, so each district should possess at least one collection centre to ease the drop of E-waste.  Atleast 3 nos. of E-waste ECO-Park (not less than 5 acres in area), one in each North, South and East regions of Delhi should be created where proper dismantling, refurbishing can be done.  Atleast two recycling units should be created in Delhi for efficient work and state board can easily verify the authenticity of dealers, refurbishers, dismantlers whether they are legally tied with recycler.  ATM can be installed where in return of every electronic equipment, cash back can be provided.  ULBs can provide toll-free number and door to door services to dispose-off E-waste. Service Plan for NCT of Delhi for Plastic Waste Management is Annexure VIII (a).[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 883 Other Bio-Medical Waste: information Under the provisions of Bio Medical Rules 2016, the department in the  Key business allocation of land assignment shall be responsible for providing infrastructure suitable site for setting up of common biomedical waste treatment and or special disposal facility in the State Government or Union territory Administration projects and the selection of site for setting up of such facility shall be made in identified consultation with the prescribed authority, other stakeholders and in during the plan accordance with guidelines published by the Ministry of Environment, Forest period, along and Climate Change or Central Pollution Control Board. with details of projects and The CPCB guidelines dated 21.12.2016 provides that alternately a CBWTF their timelines may also be allowed to establish on a land procured by an entrepreneur  Estimated land in accordance with the location criteria suggested under these guidelines. requirements for projects. The DPCC is in process of calling the expression of interests for 2 CBWTFs on privately owned land to cater the need for next 10 years (up to 2031) and project is likely to be completed by end 2022.However looking in to the present and future scenario there is a need to identify 3 plots of lands of size not less than one acre in three geographically distributed areas of Delhi (one in trans Yamuna for East, North East & Shahdara, second in South East, South, South West & New Delhi and third in Central, North, West & North West districts) so that CBWTFs can be made operational on Govt Land post 2031. As per CPCB guidelines, CBWTF shall preferably be developed in a notified industrial area without any requirement of buffer zone (or) a CBWTF can be located at a place reasonably far away from notified residential and sensitive areas and should have a buffer distance of preferably 500 m so that it shall have minimal impact on these areas. E- Waste:  Public Awareness sessions should be organized on regular basis.  Awareness programme for refurbishers, dismantlers, recyclers and dealers should be organized twice in a year. 2. Key targets that will be included in MPD 41 Action Plan: Component Current status Target for 2041 Phasing Plan Percentage of C&D 88.4 % [1.22 (3342 TPD)] 100 % NCT of Delhi will Waste Processed require creation of 3.66 (10,027 (Fresh + Legacy) additional annual TPD) processing Percentage of Recycled 107.4 % 100 % capacity of 2 C&D Waste Products Million MT (5479 [1.31 (3589 TPD) including (Tiles, Blocks, TPD) by 2041 as Legacy C&D waste Reinforcements, filling below: products] materials etc.) used. By 2026 – 0.5 Million [Offtake by Govt. MT (1370 TPD) Departments - 0.70 (1917 TPD) And Offtake by Private Parties - 0.61 (1671884 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] TPD) ] By 2031 – 0.5 Million MT (1370 TPD) By 2036 – 0.5 Million MT (1370 TPD) By 2041 – 0.5 Million MT (1370 TPD) Annexure VIII (a): Service Plan for NCT of Delhi for Plastic Waste Management in respect of Draft MPD 41 1. Application: Ministry of Environment, Forest and Climate Change, Govt. of India has notified the Plastic Waste Management (PWM) Rules, 2016 as amended by 2018. (i) These rules are applicable to every waste generator, local body, Gram Panchayat, manufacturer, Importers and producer. (ii) The rule 4 shall not apply to the export-oriented units or units in special economic zones, notified by the Central Government, manufacturing their products against an order for export: Provide this exemption shall not apply to units engaged in packaging of gutkha, tobacco and pan-masala and also to any surplus or rejects, left over products and the like. 2. Salient features of (PWM) Rules, 2016, as amended to date The salient features of (PWM) Rules, 2016 are described below: S. No. Items Description 1 Purpose Plastic waste minimization; Source segregation; Recycling; Collection of plastic waste fraction; Adoption of polluter‘s pay principle; 2 Application To Every: Waste generator; Local body; Gram Panchayat;[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 885 Manufacturer; Importers and Producer. 3 Conditions for Shade of Carry Bag should be natural as per IS: 9833:1981; Carry bags Provision of thickness for carry bags made of virgin or recycled plastic is, thickness>= 50 microns (made up of recycled or virgin plastic). Thickness of carry bags is not applicable to carry bags made up of compostable plastic; The carry bags made from compostable plastics shall confirm to the Indian Standard: IS17088:2008. The manufacturers or seller of compostable plastic carry bags shall obtain a certificate from the Central Pollution Control Board before marketing or selling; Plastic sheet or like, which is not an integral part of multilayered packaging shall not be less than fifty microns in thickness except where the thickness of such plastic sheets impairs the functionality of the product; Recycling of plastic waste shall confirm IS 14534:1998. Carry bags made of recycled plastics shall not be used for Packaging food stuff; Sachets using plastic material shall not be used for storing, packing or selling Gutkha, tobacco and pan masala; Vinyl Acetate - Maleic Acid - Vinyl Chloride Copolymer, shall not be used in any package for packaging Gutkha, pan masala and tobacco in all forms. 4 Responsible Local body; Stake-holders Gram Panchayat; Waste Generators; Producers, Importers and Brand Owners. 5 Marking or PET Polyethylene Terephthalate, Labeling HDPE High Density Polyethylene V Vinyl (PVC), LDPE Low Density Polyethylene PP Polypropylene PS Polystyrene Others ABS - (Acrylonitrile butadiene styrene), PPO- (Poly phenylene oxide), PC- (Polycarbonate), PBT- (Poly butylenes terephalate)886 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 6 Prescribed The State Pollution Control Board and Pollution Control Authority for Committee in respect of a Union territory; enforcement of the The concerned Secretary-in-charge of Urban Development of the provisions of these State or a Union Territory; rules; The concerned Gram Panchayat shall be the authority; District Magistrate or the Deputy Commissioner. 7 Responsibility of Retailers or street vendors shall not sell or provide commodities retailers and street to consumer in carry bags or plastic sheet or multi-layered vendors packaging, which are not manufactured and labeled or marked, as per prescribed under these rules; Retailers or street vendors if providing commodities in above mentioned packaging shall be liable to pay fines. 8 State Level State Government or the union Territory shall constitute SLMC for the effective monitoring of implementation of these rules; Monitoring Committee (SLMC) The State Level Advisory Body shall meet at least once in Six Month and may invite experts, if it considers necessary. 9 Annual Reports Every person engaged in processing or recycling of plastic waste shall submit annual report in Form-IV to local body by 30th a) Concerned April(Every year); persons/ Departments Every local body shall submit annual reports in Form-V to concerned Secretary-in-charge of the Urban Development Department by 30th June, every year; Each State Pollution Control Board or Pollution Control Committee shall submit annual reports in Form-VI to CPCB by 31st July, every year; The CPCB shall prepare a consolidated annual report on the use and management of plastic waste and forward it to the Central Government along with its recommendations before the 31st August of every year. b) Flow of Information 3. Plastic Waste (PW) Generation: Estimated PW Generation in Delhi: 1500 MT/D[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 887 4. Constraints in implementation of PWM Rules 2016, as amended 2018: 4.1. There are a number of constraints in implementation of PWM rules 2016, few of them are given below: a) Annual Reports are not submitted on-time by Responsible Agencies/Authorities by 30th June each year; b) Monitoring of implementation of PWM Rules by Urban Development Departments & Municipal Bodies is inadequate; c) Non-recyclable plastic wastes such as multi layered and metalized pouches and other thermoset plastic poses disposal problems; d) Use of sub-standard (<50μm) plastic carry bags, packaging films etc. pose problem in collection and recycling, thus, ultimately dumped on land, drains, rivers, e) Co-ordination of DPCC with Local Bodies in enforcement of use of sub-standard (<50μm) plastic carry bags & actions taken by ULBs. 4.2. Recommendations of SLMC: a) All departments including ULBs, SDMs and DPCC were advised to adhere to the directions of Hon’ble NGT dated 02.12.16 and 10.08.17 regarding complete prohibition on the use of plastic carrybags made of plastic less than 50 microns and are non- compostable in entire NCT Delhi a prohibition of use of disposable plastic glasses in entire NCT Delhi at hotels, restaurants and public as well as environmental compensation of Rs 5000/- per default. All agencies were directed to expedite the actions of seizure of plastic and imposition of fines. b) Further, all ULBs and DPCC were directed to design programmes for creating awareness among general public regarding prohibition on the use of plastic carrybags made of plastic less than 50 microns and are non-compostable in entire NCT Delhi a prohibition of use of disposable plastic glasses of the Plastic Waste Management Rules, 2016 as amended, 2018. c) The representative of plastic traders and manufacturing industry were also advised to educated and guide the trades/manufacturers to adhere to the provisions of Plastic Waste Management Rules, 2016 as amended, 2018. The concept of Extended producer’s responsibility was also discussed and it was desired that plastic trades/manufacturers association shall give their full cooperation this regard to the ULBs in framing the bye- laws.888 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 5. Environmental issues of PWM in Delhi: a) Littering of Plastic Waste in open lands, drains, bus stations, railway tracks, dustbins/dhalaos, roadsides, commercial areas, etc. b) Open Burning of plastic waste emit toxic gases, polluting ambient air. c) Unscientific/ unregistered plastic waste recycling/manufacturing poses threat to environment specially in residential areas; d) Eating/engulfing plastic waste along with food residues by cattles, birds etc. 6. Information, Education & Communication (IEC) Programme a) What is IEC: 1. To develop communication strategies to promote positive behaviour. 2. Create awareness among various stakeholders. 3. To make development participatory through advocacy. 4. To transfer knowledge, skill and technique to people. 5. To bring transparency in program implementation at field level. 6. To promote the concept of accountability and social audit. b) Role of IEC in Waste Management: 1. To inform, educate and inspire people to realize their roles and responsibilities and benefits of adopting right waste management practices. 2. To bring motivation, awareness and empowerment. 3. To bring transformational shift in waste management barriers: 4. Practice level barrier 5. Attitude level barrier 6. Knowledge level barrier 7. To reach all communities and to reach out to all kind including children, women, men, youth and elderly people. 8. To create awareness, sensitization and motivation of people to follow right hygiene, sanitation and waste handling practices.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 889 c) Types of Communication: 1. Mass Communication 2. Person to Person Communication d) Key ways of Communication: 1. At national or mass level TV commercials and advertisement can play role. 2. Handbook, leaflet and brochures. 3. Motivational hoardings catering to Swachh Bharat and posters at critical locations of city. 4. One to one meeting could be held at family and community level, since PWM involves attitudinal change. 5. A city centric waste management book. e) Funding pattern of IEC Programme: 1. IEC has 15% funds of total central allocation. 2. Out of this 12% is for States to conduct campaigns on public awareness for different issues of public health, hygiene and environment. 3. Campaign using different means, like short films, radio, plays, workshops, social media and radio. Newspaper and TV are excluded from this. 4. Remaining 3% is for MoHUA to run a national media campaign and to develop standardized methods for campaigning. 5. The IEC plan made by States should approve by HPC of States. 50% of the approved fund should be given to ULBs. 6. ULBs have to spend minimum 50% of the ULB funds for IEC. This fund cannot be used for any other purpose, like buying vehicles, construction or maintenance. 7. Technologies for Disposal of Plastic Waste: i. Mechanical Recycling. ii. Utilization of Plastic Waste in Road Construction. iii. Co-processing of Plastic Waste in Cement Kilns & Co-incineration in waste to energy plants. iv. Conversion of Plastic Waste into Fuel-oil (Chemical Recycling). v. Disposal of plastic waste through Plasma Pyrolysis Technology (PPT).890 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] (i) Mechanical Recycling: Mechanical recycling involves processing of waste into a product which characteristics similar to those of original product. This process involves the following steps: a) Collection and Segregation: The plastics materials have varying density; hence they are segregated/separated by floatation process. b) Cleaning, Drying and Sizing: The post-consumer plastics waste requires proper cleaning and drying. The cleaned plastics waste products should be sized; the dried flakes are fed into an extruder where they are heated to melting state and forced through the die converting into a continuous polymer product or strands. c) Pelletizing: The strands are cooled by water and cut into pellets, which produces reprocess granules. d) Fabrication into end product: Reprocessed granules used as raw materials for producing end products. (ii) Utilization of Plastic Waste in Road Construction: The process of road laying using waste plastics is designed and the technique is being implemented successfully for the construction of flexible roads at various places in India. Table1: Protocol for description of road laying process S.No. Description Executing Agency Collection and segregation of plastic Municipal Corporation, Nagar Nigam, Nagar 1. waste (Except chlorinated/ brominated Parishad & Nagar and Gram Panchayat plastic waste) Municipal Corporation, Nagar Nigam, Nagar Transportation and storage of plastic 2. Parishad & waste Nagar and Gram Panchayat Cleaning and sun drying of plastic 3. Municipal Body or PWD waste Shredding of plastic waste (2 to 4 MM 4. Municipal Body or PWD size) ˚ Heating of stone aggregate (160 C - 5. Municipal Body or PWD ˚ 170 C) Adding of shredded plastic waste (5 6. Municipal Body or PWD to10% w/w for 30 to 40 seconds) Coated aggregate is mixed with hot 7. Municipal Body or PWD ˚ ˚ bitumen (Temp155 Cto163 C)[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 891 The mix-plastic aggregate Bitumen- Municipal Body or PWD Construction of 8. mix (130-140˚ C) The mix can be used polymer (plastics) Coated Bitumen Road for road laying. Action Points: a) Utilization of Plastic Waste in Road Construction in Delhi Should be promoted; b) Promotion and awareness of technology through technology transfer, Newsletters and Direct marketing. (iii) Co-processing of plastic waste as Alternative Fuel and Raw Material (AFR) in cement kilns and waste to energy plants: Co-processing refers to the use of waste materials in industry process such as cement and power stations or any other large combustion plants. Co-processing indicates substitution of primary fuel and raw material by waste, recovering industry and material from waste. Waste material such as plastic waste used for co-processing are referred to as alternative fuels and raw material (AFR). Co-processing of plastic waste offers advantages for cement industry as well as for the Municipal Authorities responsible for waste management. On the other hand, cement producers or power plants can save fossil fuel and raw material consumption, contributing more eco-efficient production. In addition, one of the advantage recovery method used in existing facility, eliminating the need to invest on other plastic waste practices and to secure landfilling. Action Points: Development of technology for Co-processing of plastic waste as Alternative Fuel and Raw Material (AFR) in waste to energy plants, in Delhi. (iv) Conversion of plastic waste into liquid RDF (Oil): Steps involved in conversion of plastic waste into liquid fuel RDF (Fuel) are given below:  Mechanical segregation of plastic waste from mixed MSW dump yard/storage.  Transportation of segregated plastic waste through conveyor belt for optical segregation.  Optical segregation of plastic waste (only HD, LD, PP and multilayer packaging except PVC;  Shredding of plastic waste and dislodging dust and impurities.  Transportation of segregated (100%plasticwaste) into feeding hopper(reactor).892 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]  Feeding of plastic waste into reactor for random depolymerization in presence of additives.  Collection of liquid RDFs (Fuel).  Collection of rejects and solid waste (charcoal). Action Points: Development of technology for conversion of plastic waste into liquid fuel RDF (Fuel)in Delhi from concept to commercialization and promotes awareness of technology through technology transfer, Newsletters and Direct marketing. (v) Plasma Pyrolysis Technology (PPT) Introduction: Plasma pyrolysis is one of the technologies which could be opted for disposal of plastic waste. In Plasma Pyrolysis, high temperature is produced using plasma torch in oxygen starved environment to destroy plastic waste efficiently and in an eco-friendly manner. To find out its performance, Central Pollution Control Board (CPCB) sponsored a project titled "Plastic Waste Disposal using Plasma Pyrolysis Technology" to Facilitation Centre for Industrial Plasma Technology (FCIPT), Institute for Plasma Research, Gandhi Nagar (Gujarat). The experiment has been conducted using different categories of plastic waste such as thin carry bags, metalized and multilayer pouches etc. During the experiment, emission of pollutants i.e. particular matter (PM), Oxides of Nitrogen (NO2), Carbon Monoxide (CO), Dioxins and Furans were also monitored. The analytical data indicates that the emission of toxic pollutants including dioxins and furans are lower than the prescribed standards for hazardous waste incinerators. Pyrolysis of plastic (polyethylene) provides 90% combustible gases. Description: Plasma pyrolysis technology is the disintegration of organic/inorganic compounds into gases and non- leachable solid residues in an oxygen-starved environment. Plasma pyrolysis utilizes large fraction of electrons, ions and excited molecules together with the high energy radiation for decomposing chemicals. In this process the fourth state of matter i.e. plasmas (core temperature is around 20,000°K) is used for dissociating molecular bonds. Different types of plastic waste such as polyethylene bags, soiled plastic, metalized plastic, multi-layer plastic and PVC plastic can be disposed through PPT. In Plasma Pyrolysis, firstly the plastics waste is fed into the primary chamber at 850oC through a feeder. The waste material dissociates into carbon monoxide, hydrogen, methane, higher hydrocarbons etc. Induced draft fan drains the pyrolysis gases as well as plastics waste into the[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 893 secondary chamber where these gases are combusted in the presence of excess air. The inflammable gases are ignited with high voltage spark. The secondary chamber temperature is maintained at 105ºC. The hydrocarbon, CO and hydrogen are combusted into safe carbon dioxide and water. The process conditions are maintained such that it eliminates the possibility of formation of toxic dioxins and furans molecules (in case of chlorinated waste). This process is used by few Municipalities and hospitals; however, this can be useful for tourist place, hill stations, pilgrimage, coasts and other remote places. Cost of plasma pyrolysis plant for the disposal of plastic waste: Approximately plant cost of capacity 1 Ton/day is 1.7 Crore and 6.5 Crore for capacity of 10 Tons/day plant, excluding operational cost. Payback period of plasma pyrolysis plant of higher capacity (>1Ton/day) is around 4 to 5 years. With energy recovery system, plasma pyrolysis plant will be profitable. Merits of Plasma Pyrolysis Technology:  The plasma pyrolysis system can resolve the problems associated with particularly non- recyclable and low-grade plastic waste.  Generation of extremely high temperature in oxygen starved environment makes this technology useful for the safe destruction of plastic wastes.  This technology (PPT) can safely destroy chlorinated as well as multi-layer plastic wastes.  The plasma pyrolysis system can be installed in tourist/hilly locations.  PPT for the disposal of plastic waste along in conjunction with energy recovery makes it economically viable in higher capacity systems. Action Points: Development of plasma processing technologies in Delhi from concept to commercialization and promotes awareness of technology through technology transfer, Newsletters and Direct marketing. Way Forward for PWM: 1. Door to Door collection of MSW in 2 bins (dry& wet) shall enforced by Municipal Authorities; 2. Segregation and recycling of plastic waste should be carried out at Material Recovery Facility (MRF) to be set by each Local Body in Delhi. 3. Organize mass-awareness programme in various districts involving Municipalities & Stake- holders for not using less than fifty microns carry bags and anti-littering. 4. Setting up of squads for preventing open burning of PW shall be strictly prohibited.894 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 5. Plastics should be used as a resource for recycling, utilized in road construction, energy recovery (such as WtE Co- processing), PW into Oil etc. 6. Stopping use of single use plastic products such as carry bags, cups, plates, straw, thermocol products etc. 7. Promote use of compostable products certified by CPCB such as carry bags, cups, straws, etc. as an alternate to conventional plastics. 8. Utilization of plastic waste in different technologies. Summary of PWM:  Draft notification was also issued by the Central Government on 11th March, 2021, in exercise of the powers conferred by sections 6, 8 and 25 of the Environment (Protection) Act, 1986 (29 of 1986), for making certain amendments in the Plastic Waste Management Rules, 2016, issued vide G.S.R. 320 (E), dated the 18th March, 2016, for information of the public for making any objection or suggestion on the proposals contained in the draft notification in writing within sixty days w.r.t. thickness of Plastic Bags, Sheets and like shall not be less than 120 microns and non-woven Plastic Carry Bags shall not be less than 240 microns in thickness w.e.f. 30.09.2021. Further, complete ban on single use plastic since 01.01.2022 (single use plastic items: Plates, cups, glasses, cutlery such as forks, spoons, knives, straw, trays, wrapping/ packing films around sweet boxes; invitation cards; and cigarette packets, plastic/ PVC banners less than 100 microns, stirrers. However, above provisions shall not apply to commodities (including carry bags) made of compostable plastic materials (copy enclosed).[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 895 Key Targets for Plastic Waste in r/o MPD 41 Action Plan: Current Status of Plastic Waste: Approx. 1500 M.T. Per day Target for 2041: 100 % disposal/ recycling as per PWM Rules 7. ANNEXURE IX: SERVICE PLAN – DEPARTMENT OF POWER, GNCTD GOVT. OF NCT OF DELHI DEPARTMENT OF POWER 8TH LEVEL, ‘B’ WING, DELHI SECRETARIAT, I.P. ESTATE NEW DELHI.896 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] PERSPECTIVE PLAN FOR INFRASTRUCTURE SERVICE FOR DELHI - 2041 AGENCY: DEPARTMENT OF POWER, GNCTD 1. Projections for 2041: As per the projections, the peak load in Delhi will reach 19000 MW by year 2041. To meet such load, provision in Master Plan have to made for space for power infrastructure that will be required to establish sub stations, distribution transformers and right of way for electric poles and cables to meet future power demands. Year Population (in Power consumption (in Peak Demand (in Overall installed Millions) MUs) MW) capacity (MW) 2019 19 33082 7409 7901 2031 24.7 47167* 12269** 14110# 2041 29.1 63389* 19070** 21930# *assuming power consumption growth rate as 3% ** As per projections of Delhi Transco Limited #15% over and above the estimated peak demand 2. Land Requirement for Power Infrastructure in 2041: The land requirement has been worked out by Delhi Transco Limited and Delhi DISCOMs broadly in line with norms issued by DDA & Delhi Govt. and as per their experience at ground conditions. i. Delhi Transco Limited (DTL): The summary of perspective plan for Power Transmission Services for Delhi-2041 (MPD- 2041) as under: Voltage Tentative No. of Existing No. of proposed No. of proposed Total Level Land Reqd. substations substations (under substations (MPD- (sq. m.) pipeline or execution) 2041) 765kV 1,60,000 01 01 02 04 400kV 40,000 07 (including 03 09 19 Mandola) 220kV 7000 41 04 36 81 ● Total Grid Land: 2 x 160000 + 9 x 40000 + 36 x 7000sqm = 9,32,000 sqm[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 897 ii. Tata Power Delhi Distribution Limited (TPDDL) TPDDL majorly serves Northern part of Delhi. The current load in TPDDL area is served by 78 nos. of grid substations which is a mix of 66/11 kV and 33/11 KV. For the 33 kV belt, which is densely populated, it is assumed that the new land would be in smaller sizes and thus it has been considered that a 2 transformer grids (2 x 31.5 MVA, usable 44 MVA). For the 66 kV belt, 3 transformer grids (3 x 31.5 MVA, usable 66 MVA) is considered. Considering a diversity factor for power transformer loading, it is estimated that additional 70 nos. new grid substations will be required to meet normal load growth and an additional 20 grid substations to meet EV charging load. Thus a total of 90 new grid substations would be required. Space required for grids is 1250 sq meters. (50 x 25 sq. mtrs., min. two sides open) Considering diversity factor between power transformers, feeder and distribution transformers and accounting for bulk consumers, an additional 6850 MW or 7850 MVA of peak load has to be served by distribution transformers. Assuming 50-50 mix of dual and single transformer substation (32sqm), approximately additional 3750 dual transformer (80sqm) and 3750 single transformer substations (total 7500) would be required. ● Total Grid Land: 90 x 1250 sqm = 1,12,500 sqm ● Total Distribution Transformer land requirement = 3750 x 80 + 3750 x 32 = 4,20,000 sqm iii. BSES Yamuna Power Limited (BYPL) BYPL majorly serves the Eastern part of Delhi. Based on CAGR of 3%, BYPL load will increase from the present 1653MW to 3075MW in 2041. After including demand on account of EV and go electric drive, peak load is expected to increase further to 3600MW (approx). Based on peak load of 3075MVA, total grids required to meet the load is 88 nos. (approx). Considering the present 54 nos grids, land will be required for establishment of 52 new grids. Requirement for EV load will be additional. Land required for each grid will be 2000 Sqm (50 X 40 m). However with emerging technologies, we will try to optimize the land requirement. To meet 3600 MVA, desired capacity is 7200 MVA considering diversity factor. Based on the same, at least 1873 Nos new 11/0.433kV Substations will be needed. Requirement for EV load will be additional. Land required for each substation is 80Sqm (8 X 10 m). However with emerging technologies, we will try to optimize the land requirement. ● Total Grid Land: 52 x 2000 sqm = 104,000 sqm ● Total Distribution Transformer land requirement = 1873 x 80 = 149,840 sqm iv. BSES Rajdhani Power Limited (BRPL) BRPL majorly serves the Southern and South-West parts of Delhi. BRPL serves a geographical area of 750 sq kms with current annual peak load growth of about 5.88%. In FY 19-20, BRPL recorded peak load of 3211 MW which is 43.33% of Delhi peak (7409 MW). Assuming same share in 2041, the peak load of BRPL would be about 8263 MW (5052 MW additional) out of Delhi’s projected peak demand of 19070 MW.898 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Key upcoming loads in BRPL area includes, DIAL, DMICDC, RRTS by NCRTC, ITPO, DMRC, redevelopment projects by CPWD (Sri Niwaspuri, Kasturba Nagar, Tyagraj Nagar, Mohammadpur), urban extension in 4 zones (J, K1, K2, L). Presently, the load in BRPL area is being served by 99 nos. of grid substations which is a mix of 66/11 kV and 33/11 kV voltage levels. Considering a diversity factor for power transformer loading, 115 new grid substations will be required to meet normal load growth. Required space for a grid substation is 50x60 sqm. Each Substation area will accommodate 3 Power Transformers, GIS and 11 kV Panels, SCADA, Shunt Reactors, Batteries, Solar Systems, possible expansion in capacity and possibility to accommodate substation of voltage higher than 66 kV. Considering diversity factor between power transformers, feeder and distribution transformers and accounting for bulk consumers, an additional capacity of 11788 MVA at distribution transformers level would be required. For each 11/0.4 kV substation with two Distribution transformers of 1 MVA each, there will be space requirement of about 80 sqm. Space requirement for BRPL: a. Total Space requirement for 66/11 kV and 33/11 kV Grid Substation: 115 x 3000 sqm = 3,45,000 sqm. b. Total space requirement for 11/0.4 kV substation = (11788/2) x 80 sqm = 4,71,520 sqm c. Apart from above (a and b) land requirement for normal load growth, there will be additional requirement of land 57,000 sqm for 19 nos. grid substations and 77,120 sqm for 964 nos. of 11/0.4 kV substation in BRPL area, assuming 10% of normal load demand will be on account of EV charging load in 2041. Upcoming EV charging load includes DTC Bus, ESSL load on SDMC parking and other EV charging stations With above loading conditions and space provisions, on an average, there would be one grid substation in every 3 sq km and one DT substation in every 50,000 sqm area of BRPL. v. Gas insulated sub-stations Gas Insulated Substation (GIS) shall be promoted by DISCOMS that will have lesser space requirement. Provision must be kept in Master Plan-2041 for designated spaces in all new development projects and redevelopment projects for establishment of sub- stations, installation of distribution transformers and laying of power cables. Space for power infrastructure must be provided at right places (near to load centre). Technically feasible space for substations must be allocated for DTL/ DISCOM and proper “Right of way” to be ensured for power poles/ laying underground cable for present and future requirements. The Standard norms for Grid/Substation sizes is annexed as Annexure – IX (a).[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 899 3. UTILITY DUCT Utility Ducts (along and across the roads) are critically required to ensure proper laying of city infrastructure and also to maintain the laid infrastructure. The importance of same is acknowledged by all. Ministry of Road & transport issued circular vide F. No. RW/NH33044/29/2015/S&R(R) Dated 22.11.2016 regarding policy guidelines for accommodation of Public and Industrial utility services along and across National Highways. New main road development plan shall include the provision for subsurface space allocation among various utilities. That is dedicated corridors for power, telecom, gas, water and sewer need to be developed during the development of roads so that damage to other utilities can be minimized and systematic planning can be made for future growth. This will have a positive impact on the speed utilities can provide new power supply connections as well maintain existing ones. As one of the major reasons for faults in the underground network is damage by 3rd party, utility ducts would result in a near fault free network. This will help to increased ranking in Ease of Doing Business (EODB). Indicative arrangement as below. Figure 1 Indicative arrangement for Utility Duct The utility corridor requirement details as below: a. Subsurface utilities: Type Capacity Corridor Width 66 kV/33kV/ 11kV UG cables for main roads Around 100 MVA Min. 1.2m 11 kV & LT U/G cables for interconnecting internal Around 5 MVA Min. 0.7m roads900 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] b. Overhead network requirements: Type Capacity Corridor Width 66 kV O/H Double Circuit OH Line 110 MVA Min. 6m and 2.3m each side 33 kV O/H Double Circuit OH Line 60 MVA Min. 6m and 2.0m each side 11 kV O/H Line 5 MVA Min. 1.1m and 1.2m each side LT O/H Line 0.18 MVA Min. 1.0m and 1.2m each side There is a need to ensure constructing utility duct in all newly constructed roads and also explore possibilities to implement same in existing road also. 4. Cost estimates (in Rs. Crore) given by DISCOMs for converting 100% 11kV power cables to underground (without ducting): BRPL BYPL TPDDL 11kV network 729 27 2369 HVDS network 2574 726 790 Total (in crores) 3331 753 3159 Total Cost Rs. 7243 Crores Under Jagmagati Delhi, initial budget of 50 crores has been kept for FY 2021-22, for conversion of 11kV bare conductor to insulated conductor. 5. Vehicle switching from Fossil fuel to electricity The Delhi EV Policy, 2020 envisaged “accessible public charging facilities within 3 km travel from anywhere in Delhi” (Clause: 6.2.1) and the Ministry of Power, GoI vide guidelines and standards notified for Charging Infrastructure for EVs has also envisaged for “At least 1 Public Charging Station is to be available within a grid of 3Km. x 3Km.” DDA should include land planning for creation of Charging Infrastructure for EVs in Master Plan of Delhi 2041.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 901 6. Land/ Space Constraints: a) DISCOMs face severe space constraints for substations, feeders and other associated equipment despite taking several measures to reduce footprint of substations (like GIS, E- House, Package Station, etc.). There is rampant encroachment on power infrastructure in many areas leading to reliability, safety and power theft issues. b) A clear land policy is required for space allocation for substations, feeders and associated network equipment (like feeder pillars, distribution boxes etc.) in all existing areas based on present load density and future load growth. Land policy should specify land requirement for substations and associated network equipment in new developments including electrification of new areas, private development, EV charging stations and all new infrastructure development projects. c) Land Policy needs to incorporate measures to prevent encroachment of power infrastructure. d) Key Considerations for land allocation for 66/11kV & 33/11kV Grids: i. 66/11kV or 33/11kV grid is required for serving a load of 35MVA. ii. Based on projected peak load, total grids will be required to meet the load. iii. Considering the present numbers of grids, additional land will be required for establishment of new grids. Requirement for EV load will be additional. iv. Land required for each DISCOM grid will be 2000 Sqm (50 X 40 m). However, with emerging technologies, we will try to optimize the land requirement. e) Key Considerations for land allocation for 11/0.4kV Substations: i. Considering 1484 sq. Km area of Delhi and projected population of 29.1 million in 2041, the load density will increase which will probably highest in India. ii. Typically, 1 Nos substation is required for each MW and thus considering demand density in Delhi, around 15,000 substations/Distribution transformers will be required of different voltage levels. iii. Requirement will be higher for areas with higher load density. iv. Land required for each substation is 60Sqm (12 X 5 m). However with emerging technologies, we will try to optimize the land requirement. f) Land allocation to the concerned DISCOM need to be ensured in a time bound manner to maintain the reliability and quality of power.902 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 7. Major reforms undertaken in Delhi  The nos. of procedure have been reduced from 3 to 2: DERC vide order dt.18.12.2020 i.e. called Delhi Electricity Supply Code and Performance Standards (Relaxation) Third order 2020, reduce the number of procedures from three to two for release of Electricity connection the details are as follows: o Procedure 1: Submission of application along with all documents o Procedure 2: Field inspection & Energisation of connection  Time: For the period to be consider for DBR 2021 (i.e. May 2019 to April 2020), the electricity connections have been provided within 7 days where RoW permission is not required & within 14 days where RoW permission is required by Delhi DISCOMs.  The cost of getting electricity connection: DERC vide order dt.23.10.2019 has reduced the cost for electricity connection for 150kVA consumers from Rs. 25,000/- to Rs. 15,000/-. For sanctioned load More than 5kW and up to 150kW the cost is (Rs. 3000 + Rs. 500 per kW or per kVA as the case may be for the load beyond 5kW), limited to a maximum of Rs. 15000/-.  Reliability of Supply: Following steps are required for improvement of reliability of supply (SAIFI & SAIDI) in long term: Conversion from Overhead to Underground System, Dedicated corridors for laying Electrical network.  Steps taken by DISCOM’s to improve SAIFI & SAIDI: Upgraded from the conventional SCADA to Advanced Distribution Management System (ADMS). ADMS is an integrated platform with one user interface for SCADA, DMS, OMS, GIS, ERP, CRM, FFA and Meter Data Management System (MDMS). SAIFI - System Average Interruption Frequency Index, SAIDI- System Average Interruption Duration Index.  Formulation of Dig and Restore Policy: Dig and Restore Policy has been formulated by PWD Department for granting Online Right of Way permission by boarding all the Road owing agency on the single portal i.e. PDM (Plan, Dig & Monitor) software by Delhi Govt.  Government of the NCT of Delhi has notified self-certification for DISCOM’s installations up to 33 kV in place of 650 V vide notification dated 04.01.2017  Pole mounted transformers capacity enhanced from 250KVA to 500KVA as per CEA gazette notification dated 06.04.2015.  Simplification of Documentation for Getting New Electricity connection: Only 2 documents required i.e. ID proof and ownership proof vide DERC order dated 12.05.2016.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 903  Revision of application form for Getting New Electricity connection by removing certificate details of Electrical contractor, Lift inspector & Fire services by DERC order dated 24.04.2017.  New Connections up to 200 KW sanctioned load to be released at LT voltage level in place of 100KW only previously –Guidelines issued by DERC vide order dated 31.08.2017.  Payment of Demand note for release of electricity connection in first bill for applicants taking supply at LT level vide DERC order dated 31.05.2019.  Mandatory online applications in lieu of offline option for load above 50KVA as per DERC (Supply code and performance standards) Regulations 2017. 8. Reducing regulatory compliance burden: Dept. of promotion of Industry and Internal Trade (DPIIT), Govt. of India is Nodal Department for coordinating exercise of minimizing compliance burden on Industries/ business and on citizens. Department of Industries, GNCTD, is nodal agency on behalf of GNCTD. It is to identify further that which regulatory compliances, acts and rules can be repealed, simplified or made online. Thirteen services in consultation with DISCOMs were identified which required compliances from citizens of Delhi and referred to DERC for examining to reduce compliance burden on citizens. Presently only one compliance has been identified for making it online. The reform is as under: Dept. Burdensome Short Compliance Action to Timeline Act/Rule & Description type be taken Provision Renewals Delhi Filing of Petitions DERC Filing of Implement 31.03.20 Electricity under Section adjudicates on Petition e- filing 21 Regulatory 142 of Electricity Petitions filed petitions Commission Act 2003 and under Section other than 142 and section 142 of matters other Electricity 2003 than under before the Section 142 of Hon’ble Delhi Electricity Act Electricity 2003 Regulatory Commission904 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 9. Renewable Energy and Sustainable Power Consumption Various efforts are being made within Delhi towards harnessing renewable energy. The overarching national policy through the assigned Renewable Purchase Obligation (RPO) as well as the state level solar policy 2016 sets out clear targets for enabling the transition towards renewable energy. As per the RPO targets for Delhi, it needs to meet about 19% of its consumption from renewable by 2022. The Solar Policy 2016 estimates a solar energy potential of 2500 MW for Delhi and target implementation of 1995MW to be installed by 2025. The Government of NCT of Delhi launched “Mukhya Mantri Kisaan Aay Badhotari Solar Yojna” to install Solar Panels in such a way that farmer(s) can do farming (s) beneath the solar panels. This scheme was devised to facilitate land owners to utilise their lands for economic uses by installing solar panels, thereby minimising misuse, unauthorised constructions and ensuring balanced development and retaining the green character of these areas. The farmer(s) of Delhi can get additional fixed income by installation of solar power plants. The salient features of “Mukhya Mantri Kisaan Aay Badhotari Solar Yojna” is as under:  Solar Panels at raised structure of 3.5 meters to allow farming on agriculture land of peripheral Green Belt villages.  No change of land use, farmer(s) to continue farming.  No investment required from farmer(s), investment to be done by Solar Power Developer.  Farmer(s) to get ₹ 8333/- per month per acre of land with an increment of 6% per annum upto 25 year, additionally, 6000 units electricity per annum per MW of plant  Minimum capacity of Solar plant 1 MW, to be installed on 06 acres of land (approximately 1/3rd of the land to be covered by solar plant)  Evacuation of power to be facilitated by DISCOMs. Under “Mukhya Mantri Kisaan Aay Badhotari Solar Yojna” the Government Departments were envisaged as the power purchaser, assuming costly power generated through this scheme as solar power plants are to be installed at raised structure. Further, Government of India launched a scheme named as “Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan” or PM KUSUM scheme under which solar power plants can be installed on agriculture land, barren land, pasturelands and marshlands of farmers. This scheme mandates power generated shall be purchased by DISCOMs at pre-fixed levelised tariff or tariff discovered through bidding. The salient features of PM KUSUM are as follows:[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 905  PM KUSUM to be implemented through DISCOMs and DISCOMs are entitled for to get Performance Based Incentive @ 40 paise per unit purchased or Rs. 6.6 lakhs per MW of capacity installed, whichever is less, for a period of five years from the COD.  Solar plant of capacity 500 KWp to 2 MW. In specific cases based on Techno-Commercial Feasibility smaller than 500 KWp are allowed.  Power shall be purchased by DISCOMs. Furthermore, Power Department has envisaged merging both schemes for smooth implementation and benefit to stakeholders’ viz. DISCOMs and Farmer(s).  Delhi DISCOMs have been allocated 62 MW by MNRE, GoI under PM KUSUM scheme.  Draft documents prepared and letters sent to DERC and Delhi DISCOMs for comments on mode of scheme execution, levelized ceiling tariff and draft PPA. 10. In respect of installation of Solar PVs on rooftop of group housing societies, only 59 societies have installed SPVs. There is a huge scope of installing SPVs in the remaining 1841 societies in NCT of Delhi. It is therefore proposed that all the remaining CGHS societies and other multi storied societies should be mandated to install solar rooftop plants. With Solar installation on government land, buildings, all private buildings, Delhi can generate about more than 2000MW of solar power. Further, SPVs can also be installed on canals and highways which would enable Delhi to meet 40% of peak demand of power through solar energy. Together with the renewable energy purchases, Delhi can meet more than 50% demand from renewable energy. To sum up, DDA requires to consider the following:  Making mandatory provision for Solar PV installation in existing buildings also.  Promote Solar PV installation on vacant land available with government agencies. This can also help in mitigating/eliminating encroachment problems. 11. Building design and layout considerations for reduced demand of HVAC:  Provision of HVAC to reduce peak load is there in ECBC – 2017 notified by Bureau of Energy Efficiency (BEE), Ministry of Power, GoI.  Energy Conservation Building Code (ECBC) for commercial buildings was notified by BEE, GoI in 2007 and updated version was notified in 2017.  The Energy Conservation Building Code (ECBC), is a document that specifies the energy performance requirements for commercial buildings that have a connected load of 100 kW or greater or a contract demand of 120 KVA or greater that are to be constructed in India and is mandated by the Energy Conservation (EC) Act, 2001.906 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]  ECBC encourages energy efficient design or retrofit of lightning & control fixtures in the existing buildings so that it does not constrain the building functions, comfort, health, or the productivity of the occupants and also have appropriate regard for economic considerations (life cycle costs i.e. construction + energy costs are minimized). ECBC defines the norms of energy efficiency of building equipments and takes into consideration the climatic region of the country, where the building is located. Norms have been developed to cater different climatic zones in India such as: Composite, Hot & Dry, Warm & Humid, Moderate and Cold.  ECBC provides design norms for: o Building Envelop: It includes Thermal performance requirements for walls, roofs and windows except for unconditioned storage spaces or warehouses. o Comfort Systems & Controls: It includes the energy performance of heating, ventilating, air conditioning and service hot water & pumping and their controls. o Lighting & Controls: It includes interior and exterior lighting, day lighting and lamps & luminaries performance requirements. o Electrical and Renewable Energy Systems: It includes the energy performance of motors, transformers, DG sets, UPS and energy metering.  ECBC can effectively be implemented by participation of various stakeholders such as DDA, PWD, MCDs, Council of Architecture, NBCC, DISCOMs, and Private Builders/Engineers/Architects etc.  In Delhi, DDA prepares and notifies the Building Bye-Laws and provisions of ECBC-2007 have already been included in the bye-laws for some building types by DDA. So far DDA has included the provisions of ECBC in UBBL 2016:  UBBL 2016 U/s 3.2, table 3.5 (4e), has made mandatory compliance measures (for all buildings having plot area from 50,000 m² to 1, 50,000 m²) as recommended in the Energy Conservation Building Code (ECBC) 2007 of the Bureau of Energy Efficiency, Government of India. However, there are no provisions for making ECBC mandatory (as a whole) for buildings except the area mentioned above, only few components of ECBC incorporated.  Comprehensive mandatory provision is required to be included in the Delhi’s Unified Building Bye-Laws (UBBL) 2016 which comes under purview of DDA. Previously, DDA was requested to incorporate provisions ECBC in Delhi’s UBBL by DDA vide Secretary (Power) DO letter dtd: 01.09.2020. (copy attached)[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 907  Ministry of Housing and Urban Affairs (MoHUA), GoI has also directed DDA vide OM dtd: 21.09.2020 to consider necessary amendments to include the provisions of ECBC guidelines in Unified Building Bye-Laws (UBBL).  Further, Bureau of Energy Efficiency (BEE), GoI has also launched Eco-Niwas Samhita (ENS) for residential buildings and residential part of mixed land used projects build on plot area ≥ 500 square meters in 2018. In the first phase minimum standards for the building envelop was launched to limit heat gain or heat loss of the residential building comprising adequate day lighting potential and ventilation. BEE, GoI is developing Eco- Niwas Samhita part–II for setting up minimum standards for the Electromechanical Equipments for efficient use of energy in residential buildings, which may be released shortly. The provisions of ENS have to be incorporated in Unified Building Bye-Laws (UBBL).  DDA is being continuously followed up by Power Department for making requisite amendments in UBBL to incorporate provisions of ECBC for commercial & residential buildings.  It is proposed that DDA should urgently amend UBBL & incorporate the provisions of ECBC for commercial and residential buildings. It is also proposed to promote adoption of Energy Efficiency measures in electricity usage. 12. Installation of smart meters (by DISCOMS) The planning for installation of smart meter by respective DISCOMs is as under: S.No DISCOM Total Consumers Total Smart meters DERC approval (in lacs) installed (in lacs) taken (Nos. in lacs) 1 BRPL 27.3 (4881 numbers) 3 2 BYPL 17.7 (147 numbers) 1.7 3 TPDDL 18.2 2.1 7 4 NDMC 0.7 0.6 - Total 63.9 2.7 11.7  Total Consumer base of Delhi : 63.9 Lacs  Total Smart Meters installed : 2.7 Lacs  Balance Smart Meters to be installed : 61.7 Lacs908 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]  Each smart meter costs around Rs. 3000 and approx Rs 6000-7000 including overall logistics. Replacing all balance 61.7 lacs meters with smart meters under CAPEX model, the cost will be around Rs. 3700-4300 crores  Under OPEX model of EESL, NDMC has installed 60000 meters for project cost of Rs. 61.68 crores for 8 years i.e. Rs. 10280 / consumer for 8 years.  For balance 61.7 lacs consumers under OPEX Model based on NDMC estimation, the overall cost will be Rs. 6342 Crores for 8 years.  For targeting all the consumers, DERC will be requested for an early order for approving CAPEX / OPEX model.  Delhi DISCOMs shall also be asked to go for installation of smart meters for all consumers in NCT of Delhi in time bound manner. Annexure – IX (a) Norms for Land Size for different Grids / Substations: I. GIS (66kV / 33kV) The guidelines for plot size of GIS substations were framed vide minutes of meeting dated 12.09.2016. The guidelines are as under: ● 50m x 30m (Two side open and rectangular plot. Right of Way of 6m required) ● 55m x 30m (One side open (longer side of plot). Rectangular plot. Right of Way of 12m required) ● 40m x 50m (One side open (Shorter side of plot). Rectangular plot. Right of Way of 12m required) ● In case of irregular shaped plot or no parallel road to plot, the plot size will be decided on the basis of joint inspection of officials of DDA & DISCOMs. II. DDA order dated 09.09.2003 for Air insulated Sub Stations: ● 185m x 160m: Plot size for 220kV sub stations. Size can be further reduced if 33kV / 11kV not required. ● 95m x 90m: Plot size for 66kV sub stations. ● 60m x 45m: Plot size for 33kV sub stations. ● 10m x 8m: Plot size for 11kV sub stations. III. Reference for 11/0.4 kV DT Substation space requirement ● Clause 6(4) of Chapter on schedule of charges of DERC Supply Code 2017 read with amendments. ● SDMC Circular dated 30.03.2017 regarding provision of substation space.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 909 Annexure – IX (b) Clause 6(4) of Chapter on schedule of charges of DERC Supply Code 2017: (4) The developer/applicant taking supply at Low Tension level for any premises or for re- constructed premises, requiring LT Service connections whose: i. total cumulative demand of all floors in the plot/ building for LT service connection exceeds 100 kW/108 kVA; or ii. total cumulative built up area of the premises in the plot/building exceeds 1000 sqm; or iii. plot of size above 300 sqm or above; shall provide the space for installation of distribution transformers, as per the required load. Provided that the minimum space required to be provided by the developer/applicant for installation of distribution transformers/ equipment shall be as per circular no. South DMC/0148/SE(B)HQ/Addl. ComI/17 dated 30.03.2017 notified by South Delhi Municipal Corporation or as amended from time to time, annexed at annexure IX (c): Provided further that the existing consumer shall also be required to provide the space as above, in the event of: i. enhancement of existing load on account of additional construction in the premises and consequently the total built up area exceeds 1000 sqm of the plot/building or their total LT Service connections demand exceeds 100 kW/108 kVA; or ii. enhancement of load based on maximum demand readings for the electricity connections energized on or after 1.9.2017 and the total LT Service connections demand exceeds 100 kW/108 kVA; Provided also that if the required space is not provided by the applicant or the developer, the distribution Licensee may refuse the grant of additional load: Provided also that the consumer taking supply at LT voltage level, irrespective of its sanctioned load or the contract demand as the case may be, shall also provide the space to the licensee for installation of meter, and part of service line up to the point of supply, to the extent that would fall within his premises. [Explanation: For the purpose of this sub-clause, the built-up area shall be as specified in the plan approved by the authorized agencies. In case, built-up area is not specified in the approved plan, the built-up area shall be taken as the carpet area plus the thickness of outer walls and the balcony]910 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Annexure – IX (c) SDMC Circular on Provision of Spaces for Substation[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 911912 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)][भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 913 ANNEXURE X: SERVICE PLAN - DELHI TRANSCO LIMITED (DTL)914 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)][भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 915 PERSPECTIVE PLAN FOR INFRASTRUCTURE SERVICE FOR DELHI - 2041 AGENCY: DELHI TRANSCO LIMTED (A Govt. of NCT of Delhi undertaking) 1. PROJECTED POWER DEMAND – 2041 As per the trends indicated by Department of Power, GNCTD, the power demand by 2041, is projected to reach 63,389 MU. Peak demand is likely to increase to 19,070 MW. Based on this it is estimated that the total installed capacity would also need to be increased threefold up to 21,930 MW (15% over and above the estimated peak demand). The current installed capacity for Delhi is 7,901 MW thus an additional installed capacity of 14,029 MW needs to be added in the coming plan period. The following Renewable Purchase Obligation targets have been set by MNRE for Delhi- 19% by 2022, 38.5% by 2031 (based on 450GW national target by 2030) and 50.5% by 2041 (further projection of 2030 targets). The total power consumption needs to be met from renewable energy based on these targets. Strategies shall be developed and efforts shall be made along with DISCOMs to meet the set targets. Areas that are going to be developed under land pooling policy, a thumb rule being practiced in the power sector for catering power requirement for 16-20L urban population, 1 no. 400-220kV substation and 3 nos. of 220kV substation has been considered for ensuring the system reliability. Downstream network (66kV, 33kV and 11 kV) as Power Distribution services for Delhi is required to be provided by the concerned DISCOMs in Delhi. Table 7: Abstract of total Substation requirements (765/400/220kV) Sl. Voltage No. of Existing No. of Proposed No. of Associated RoW No. Level Sub-Stations Substations (under Proposed Requirement execution) Sub-Stations 1. 765 kV 1 1 2 67m RoW for overhead transmission line 2. 400 kV 7 (Including 3 9 52m RoW for Mandola) overhead transmission line 3. 220 kV 4 4 37 35m RoW for overhead transmission line or 2X2 mtr for UG cable916 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Table 8: Zone-wise-Perspective Plan for Power Transmission Services (765/400/220 kV) for Delhi MPD 2041 ZONES Existing Voltage Requirement Tentative Requirement Remarks 400/220 kV Level for MPD area by the Year substation 2041 required (in sqm) Zone - NIL - - - A No ESS in this zone 220/33 kV Asaf Ali Being the 2027 This will provide Installed Road land scarcity power to New capacity (Wall city) in the area, Delhi railway 400 MVA minimum station, Delhi area Metro Rail and required upcoming multi 7000 sqm. story development. Zone - Dev Nagar 220/33 kV Under construction B (Karol Bagh) 400/220/33 IARI Pusa/ 200 x 200 2025 All the existing kV Dev Nagar sqm 400 KV station (40000 sqm) in Delhi are at the outer part of Delhi. Due to non-availability overhead corridor, power is being transmitted through underground cables. The 220kV underground cables have the limitations of shorter length and power carrying capacity.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 917 Therefore, a strong source of 400 kV level has become the urgent requirement in central part of Delhi. IARI PUSA are seems that 400 KV substation can be established for power requirement of central Delhi. Zone- Sabji Mandi 220/33 kV C Sanjay 220/66 kV Gandhi Existing Transport Nagar (SGTN) Gopal Pur 220/66 kV- 33kV Timar Pur 220/33 kV Under construction Gopal Pur 400 kV Up-gradation in under tendering New proposal to be included in MPD-2041 220/33 kV Azad pur Being the 2031 This substation (400 MVA) land scarcity will be required in the area, to cater the minimum natural growth area of nearby area required and will provide 7000 sqm the relief to existing Gopal Pur (33 kV level) and sabji Mandi area Zone- Electric Lane 220/33 kV - - D (Harish Chandra918 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Mathur Lane) Lodhi Road 220/33 kV Park street 220/66-33 kV Sarojini 10000 sq.mt 2023 NDMC is in Nagar process of Redevelopment of General Pool Residential Accommodation (GPRA) colony at Neetajee Naga, Nauroji Nagar & Sarojini Nagar through NBCC. NBCC has earmarked a piece of land for establishment of 220 kV substations. Zone- Harsh Vihar 400/220/66 E (East of Loni kV Road) Existing Substation Patparganj 220/66-33 kV Gazipur 220/66 kV Preet Vihar 220/33 kV Geeta 220/33 kV Colony New proposal to be included in MPD-2041 220/33 kV Dwarka Being the Immediate This proposed Puri/ land scarcity substation has Shahdara/ in the area, been planned Welcome minimum for future colony area development to required meet the 7000 sqm. industrial; and residential load growth around[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 919 Shahdara, Welcome Colony, Seelampur, Jafrabad etc. 220/66 kV GTB Being the 2025 This proposed Hospital/ land scarcity substation has Dilshad in the area, been planned Garden/ minimum for future Nand Nagari area development to required meet the 7000 sqm. industrial and residential load growth around Jhilmil, Dilshad garden, Nand Nagri etc. 400/220 Geeta Being the 2025 DDA may allot kV Colony land scarcity an area near in the area, existing 220 kV minimum DTL Geeta area Colony required substation from 7000 sqm. where 440 kV Transmission line can easily be connected. Therefore, no separate corridor for 400kV transmission line is required. 220/33 kV Mayur Vihar Being the 2027 This proposed land scarcity sub-station is in the area, for future minimum development to area meet the required industrial and 7000 sqm. residential load growth around Mayur Vihar area. 220/66 kV Yamuna Being the 2038 This proposed920 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Vihar/ Loni land scarcity sub-station is Road in the area, for future minimum development to area meet the required industrial and 7000 sqm. residential load growth around Yamuna Vihar area. Zone- Masjid moth 220/33 kV F AIIMS 220/33 kV Sarita Vihar 220/66 kV Existing R K Puram 220/66-33 kV Vasant Kunj 220/66 kV Okhla 220/66-33 kV Tughlakabad 400/220/66 kV Ridge Valley 220 kV BTPS 220/66 kV Under tendering (65 kV level) (480 MVA) New proposal to be included in MPD-2041 400/220 Near Sarita 200 x 200 2032 To meet the kV Vihar/ BTPS sqm long-term load (40,000sqm) requirement of south Delhi area. 220/ 33 KV Nehru Place Being the Immediate The location (300 MVA) land scarcity has already in the area, been minimum earmarked by area DDA for required establishment 7000 Sqm of 220/33kV ESS but land has not been handed- over to Power Dept. / DTL yet. 220/ 33 KV Malviya Being the 2027 During recent Nagar land scarcity communication[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 921 (300 MVA) in the area, with DDA has minimum informed that area there is required earmarked plot 7000 Sqm for ESS of area of about 3100 sqm in Malviya Nagar. After going through the DDA offer, the plot size is not sufficient. Therefore, it is requested to increase the plot size or earmarked sufficient area for 220 kV ESS at nearby area. 220/66KV West of JNU Being the 2036 This ESS will (480 MVA) land scarcity provide relief to in the area, existing 220 KV minimum ESS (Vasant area kunj) and will required help to manage 7000 Sqm the load growth. DDA may kindly earmark an area near Priya PVR area, for easy evacuation of power. 220/66KV Jasola Being the 2038 The ESS that (480 MVA) land scarcity will provide in the area, relief to existing minimum 220 KV ESS area (Sarita Vihar required and Okhala) 7000 Sqm and upcoming BTPS and will help to manage the load growth.922 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] DDA may kindly earmark an area near Okhla waste to power generation plant ZONE- Peeragarhi 220/ 33 KV G DIAL 220/ 66 KV Existing Naraina 220/ 33 KV Budella 220/ 66 KV Under tendering New Proposal to be included in MPD-2041 220/33KV Punjabi Being the Immediate This ESS is top (400 MVA) Bagh land scarcity priority to meet in the area, the load growth minimum of the area, a area 220 KV ESS required implementation 7000 Sqm is must. DDA may kindly earmarked an area near the road crossing of MG road and Vashisht Kumar Gulla marg (Vacant land) for easy evacuation of power. 220/ 66 KV Aero City Being the 2025 To cater the land scarcity load growth of in the area, commercial hub minimum ground airport area required 7000 Sqm 220/33 KV Janakpuri Being the 2029 This will provide (400 MVA) (Pankha land scarcity relief to existing road) in the area, Panjabi Bagh & minimum Naraina ESS area and will help to required manage load 7000 Sqm. growth. DDA may kindly[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 923 earmark an area between C3 road and C2 park (vacant land) for easy evacuation of power. 220/33 KV Hari Nagar/ Being the 2041 This will provide (400 MVA) Pratap land scarcity relief to existing Nagar in the area, Papankalan-I & minimum Naraina ESS area and will help to required manage load 7000 Sqm. growth up to 2021 & beyond. DDA may kindly earmark an area near bus depot at Pratap nagar (vacant land) for easy evacuation of power. 220/33 KV Kirti Nagar Being the 2032 This ESS is (400 MVA) land scarcity required to in the area, meet the load minimum growth of area existing area. required 7000 Sqm. ZONE- Rohini-I 220/ 66 KV H Wazirpur 220/ 33 KV Existing New Proposal to be included in MPD-2041 220/66 KV Rohini Being the 2038 This will provide (520 MVA) Sector-1 land scarcity relief to existing in the area, Rohini ESS and minimum will help to area manage load required growth up to 7000 Sqm. 2041 & beyond. DDA may kindly earmark an area near the924 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] existing NDPL grid in this sector. 220/33 KV Ashoka Being the 2029 This will provide (400 MVA) Vihar land scarcity relief to existing in the area, Shalimar Bagh minimum and Wazirpur area ESS and will required help to manage 7000 Sqm. load growth up to 2041 & beyond. ZONE- Mehrauli 220/66 KV Existing J New Proposal to be included in MPD-2041 765/400 Mandi 400x 400 2030 One 765 kV is (220 kV) Village Sqm. required to (160,000 meet the load Sqm.) growth of south Delhi, will provide grid power to existing and proposed 400 KV ESS. This proposed substation is planned at Mandi Village. This substation is required for major source of power supply to new developing as well as existing area at the south boundary of Delhi. DDA is also requested to provide RIGHT[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 925 of Way for 765 KV ESS from existing Agra- Jhatikara 765 KV transmission Line. 420/220 Rang Puri 200x 200 2027 To provide the kV/ 66kV Sqm. 220 KV source (20,000 to Vasant Kunj Sqm.) and future load growth of nearby area. 220 KV Maidan Being the 2024 This will provide Garhi land scarcity relief to existing in the area, Mehrauli & minimum Okhla ESS and area will help to required manage load 7000 Sqm. growth up to 2021 & beyond. The location may be earmarked by DDA near/ beneath DTL 220 KV Mehrauli- Tughlakabad overhead Line. 220 KV Aya Nagar 10000 Sqm. 2028 This will provide relief to existing Mehrauli ESS and will help to manage load growth up to 2021 & beyond. Further DTL has no 220 KV ESS in this south area to cater to the future load growth.926 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 220 KV Fatehpur 10000 Sqm. 2032 This will provide beri/ Asola relief to existing Sarita Vihar & Okhla ESS load growth up to 2021 & beyond will be very difficult to meet without this proposed substation. DDA may kindly earmark an area near Tughlakabad industrial area. 220 KV Bhati Mines 10000 Sqm. 2038 This will provide transformation capacity to meet the load growth of this extreme south corner of Delhi. ZONE- Najafgarh 220/66 KV Existing K-1 New Proposal to be included in MPD-2041 220 KV Bakkarwala 10000 Sqm. 2027 DDA may earmarked an area to meet the load growth due to new residential colonies like Lok Nayak Puram and other industrial developments are also proposed in this rea. It will much better, if an area may kindly[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 927 be earmarked near pocket-c of Lok Nayak Puram (vacant land), for easy evacuation of power as the rea is closer to existing 220 kV EHV overhead line 220 KV Dichoan 10000 Sqm. 2036 This 220 KV Kalan ESS will be required for long-term load requirement. ZONE- Bamnauli 400/220 K-II kV Papankalan- 220 KV Existing I Papankalan- 220 KV II Papankalan- 220 KV III Dwarka 400/220 Under Execution (400 kV level) sector-5 kV Bharthal 220/66 KV Under tendering New Proposal to be included in MPD-2041 220/66 KV Dwarka Being the 2034 The load growth Sector- 23 land scarcity is very in this in the area, zone. minimum Therefore, this area ESS will be required required to 7000 Sqm. cater the load in long term. ZONE- Jhatikara 765/400 L KV Existing Tikri kalan 400/220 kV/ 66kV928 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] New Proposal to be included in MPD-2041 400/220 Jhatikara 200x 200 2023 This zone has kV/ 66kV Sqm. been notified to develop under DDA land 400 KV Mitraon 200x 200 2036 pooling Sqm. scheme. These 220 kV Mundela 10000 Sqm. 2040 substations are Khurd required to 220 kV Chawala/ 10000 Sqm. 2030 cater the load of Tejpur proposed to be 220 kV Dhansa 10000 Sqm. 2030 developed under land pooling scheme. Further, DDA is requested earmarked the ROW for 400 KV and 220 KV overhead transmission lines. ZONE- Rohini-2 220/66 kV Existing M New Proposal to be included in MPD-2041 400/220 Barwala 200x 200 2026 This will meet kV/ 66kV Sector- 37 Sqm. the demand of (40,000 land pooling Sqm.) area of zone- N and growing demand of Rohini area 220 kV Begampur Being the 2034 No area has land scarcity been in the area, earmarked at minimum this area, but area the load growth required of residential 7000 Sqm. colonies of sector-21, 22, 41 Begaumpur, Pratap vihar and other[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 929 developments are also to be met through this proposed ESS. So, DDA may kindly be requested to allot an area in this zone, positively to meet the load. It will much better, if an area may kindly be earmarked near existing 66 KV ESS at sector-22 Rohini (vacant land) for easy evacuation of power, as the rea is closer to existing 220 KV EHV overhead line. ZONE- Kanjawala 220/ 66 KV Existing N 765 KV Under planning ISTS Narela New Proposal to be included in MPD-2041 400 KV Chandpur 200x 200 2033 Already Sqm. earmarked in MPD-2021 220 kV Nizampur 10000 Sqm. 2036 DDA may allot an area near Daryapur/ Bazidpur to cater to the proposed kanjhaala industrial area. 220 kV Qutub Garh 10000 Sqm. 2041 DDA may allot an area near930 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] nizampur to cater to the proposed kanjhaala industrial area also DTL do not has any 220 KV ESS at this western area to cater to the load growth. ZONE- Wazirabad 220/ 66 KV O Kashmiri 220/ 33KV Gate Existing Rajghat 220/ 33KV IP power 220/ 33KV Pragati 220/ 66 KV Power Maharani 400/220 400/220 KV is existing and creation of 66 KV 33 KV Level is Bagh kV/ 66- under tendering. 33kV IP Power 400 KV Upgradation of existing 220 KV will be done in due course of time. New Proposal to be included in MPD-2041 220/66 KV Karawal 10000 Sqm. 2028 DTL do not has Nagar/ any ESS on this Sabha Pur North Part of (beneath of Delhi, only one existing DTL distribution 220 KV substation of overhead BYPL is there. transmission To meet the line) load growth of soniya vihar, Karawal Nagar, Sabha pur, shiv Vihar etc. area, an area may be earmarked for future developments along the Pusta & Beneath of[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 931 existing DTL 220 KV overhead transmission line (Mandola- Wazirabad- two lines). So that, no separate corridor could be required of connectivity to this. ZONE- Bawana 400/220 P-I kV/ 66 kV Narela 220/ 66 kV Existing DSIIDC 220/ 66 kV Bawana Tikri kurd 400/220 The project is proposed to be commissioned by year 2023 kV/ 66 kV on land allocated by DDA. New Proposal to be included in MPD-2041 220/ 66 kV Holambi 10000 DDA may allot (480 MVA) Kalan Sqm. an area near Holambi Kalan to cater to the industrial area also with 35 m ROW corridor for overhead transmission line as this area has under development. 220/ 66 kV Budhpur 10000 DDA may allot (480 MVA) Sqm. an area near Budhpur to cater to the industrial area around around siraspur, budhpur, Chandpur etc. to cater to the load growth.932 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 220/ 66 kV Bankner 10000 DDA may allot (480 MVA) Village Sqm. an area near Banker to cater to the industrial area around DSIIDC Bawana and Narela etc. to cater to the load growth of residential areas around this location. If possible, DDA may allocate a land near Bankner village area, just beside the existing 220 KV EHV line. ZONE- New Proposal to be included in MPD-2041 P-II 765/400 Palla Village 400 m X 2041 This area has kV/ 220 kV 400 m been notified to (160,000 develop under Sqm.) DDA land pooling scheme. This sub-station is required for major source of power supply to new developing as well as existing area at the North boundary of Delhi. DDA may allot the land near to the Yamuna Bank and border of Delhi.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 933 220 kV Burari 10000 2026 Load demand Sqm. of nthhu Pura, Burari, Sant Nagar is growing in rapid rate. This substation will provide the relief to existing Gopal pur substation. DDA may allot the land near DTL existing lines. Note: Although the location has been earmarked in MPD-2021. 220 kV Mukhmel 10000 2032 This area has pur Village Sqm. been notified to develop under DDA land pooling scheme. DDA may allot the land near DTL existing lines. Note: Although the location has been earmarked in MPD-2021. 220 kV Mohmadpur 2041 This area has Village been notified to develop under DDA land pooling scheme. DDA may allot the land near DTL existing lines.934 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ANNEXURE XI: SERVICE PLAN - INDRAPRASTHA GAS LIMITED (IGL) INDRAPRASTHA GAS LIMITED, NEW DELHI. PERSPECTIVE PLAN FOR INFRASTRUCTURE SERVICE FOR DELHI - 2041 AGENCY: INDRAPRASTHA GAS LIMITED (IGL) Government of India is keen on making India a Gas based Economy – Aiming to push share of natural gas in energy basket from present 6% to 15% by 2030. Going ahead there is a need to lay greater emphasis on using cleaner fuels such as PNG & CNG and discouraging the use of polluting fuels such as FO, LSHS, Coal etc. The growing prices of diesel is resulting into decline in production of diesel variants & launching of more and more CNG variants by vehicle OEM’s.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 935 There are opportunities of expanding existing LNG infrastructure. There is also a huge potential for converting in-use diesel trucks/buses to LNG in Delhi. IGL may cash-in the opportunity to create EV infrastructure at existing CNG stations. New Segments such as E-Rickshaws/Two Wheelers can be tapped under battery swapping facilities, being planned by IGL. Below is the projected growth in CNG, Industrial, Commercial and Domestic sales volumes for the next 5 years. Considering the growth dynamics in the sector, IGL shall update its service plan once every 5 years. Table 9: Segment wise projected growth in sales volume (MMSCMD) Sl. No. Segment/FY 2021-22 2022-23 2023-24 2024-25 2025-26 CAGR 1 CNG 4.06 4.51 5.01 5.56 6.17 11% 2 Industrial 0.13 0.15 0.17 0.19 0.22 14% 3 Commercial 0.11 0.12 0.14 0.15 0.17 13% 4 Domestic 0.32 0.40 0.49 0.61 0.76 24% Total 4.62 5.18 5.81 6.51 7.32 MMSCMD: Metric Million Standard Cubic Meter per Day Table Source: IGL CNG: At present there is a shortfall of 35 CNG Stations in Delhi (area required for each station is approx. 1080 sqm); refer Annexure XI (a) for details of area wise requirements. In the next 5 years, 110 new CNG Stations are planned (excluding land pooling zones) and about 20 Nos. of Field Regulatory Station is required in the next 5 years (area required for each station is approx. 100 sqm). The area requirements for a Mother Station is 3000 sqm and for an Online Station is 1080 sqm. Below is the zone wise CNG station requirements for land pooling areas: Table 10: No. of new CNG stations required for each zone Sl. Zone No. of CNG No. name stations proposed 1. K1 5 2. L 10 3. N 5 4. P2 4 Total 24 Table Source: IGL PNG: IGL currently has 9, 66,098 households connected with PNG in Delhi (up to 31.10.2020). 9 lakh households are planned to be connected to PNG in the next 3 years.936 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Annexure XI (a): Land Requirement for CNG Stations S.No. Particular area Stretch Route Description 1 Ring road Bypass From Pragati Maidan CNG station to ISBT Kasmiri gate 2 Ring road Bypass From ISBT to Dheerpur CNG Station 3 Inner Ring road From Burari Chowk to IGL Shakurpur CNG Station 4 Outer Ring road From Dheerpur CNG station to Jahangirpuri CNG station 5 Outer ring road From Janakpuri District Centre to Madhuban Chowk 6 North Central Delhi Rajouri to Connaught Place (both sides)-1 7 North Central Delhi Rajouri to Connaught Place (both sides)-2 8 South Delhi From Hari Nagar Ashram to RKP 12 9 Outer Ring Road From Rohini Sector 19 CNG Station to Metcalfe House CNG Station 10 Ring Road area Mayapuri Metro Station to IGL Sarojini Nagar Station 11 Badarpur Border From Faridabad Delhi Border to CRRI (towards Delhi) 12 South Delhi RKP 3 to Nehru place (Both sides of the road) 13 South Delhi Kalkaji to Andrews Ganj Via Chirag Delhi (Both Sides) 14 South Delhi Sri Aurobindo Marg to Lado Sarai Hybrid(Both Sides) 15 South Delhi RKP 12 to Brar Square (Both sides of the road) 16 Mehrauli Badarpur road Mehrauli to Sarvodaya Enclave (Both Sides) 17 Main Chattarpur road KR Hospital to Satbari 18 Mehrauli Gurugram road Mehrauli to Indian Oil Janta Filling Station (Both sides) 19 Lajpat Nagar/Defence From The Oberoi to Moolchand Flyover Via Lala Lajpat Rai Colony Road 20 South Delhi August Kranti Marg (Both sides) 21 South Delhi (SDMC) Kalkaji to Andrews Ganj via Greater Kailash 22 Defence Colony, SDMC, Bhisma Pitamah Marg(Both Sides) Delhi 23 South East Delhi(SDMC) Batla House Market, Near By Area 24 South Delhi Moolchand to Pushpabhawan(Both sides of the road) 25 NH-8 NH8 (Dhaula Kuan to Rajokri), Both Sides 26 South Delhi AIIMS to Ashram on Ring Road (Both Side)[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 937 ANNEXURE XII: SERVICE PLAN – DEPARTMENT OF INFORMATION AND TECHNOLOGY, GNCTD GOVT. OF NCT OF DELHI DEPARTMENT OF INFORMATION AND TECHNOLOGY 9TH LEVEL, ‘B’ WING, DELHI SECRETARIAT, NEW DELHI – 110002.938 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] PERSPECTIVE PLAN FOR INFRASTRUCTURE SERVICE FOR DELHI - 2041 AGENCY: DEPARTMENT OF INFORMATION AND TECHNOLOGY, GNCTD Perspective plan for making Delhi digitally enabled as per National Digital Policy: 1. Creating a Robust Digital Communication Infrastructure  Provide Universal broadband connectivity at 1Gbps to every citizen  Enable fixed line broadband access to 100% of households  Achieve ‗unique mobile subscriber density‘ of 100% by 2041  Enable deployment of public Wi-Fi Hotspots; to reach  Ensure connectivity to all uncovered areas 2. Implementing a ‘Fibre First Initiative’ to take fibre to the home, to enterprises and to key development institutions e.g. schools, colleges, hospitals.  Promoting collaboration models involving state, local bodies and private sector as necessary for provision of shared duct infrastructure in municipalities, rural areas and national highways.  Facilitating Fibre-to-the-tower programme to enable fiberisation of 100% of telecom towers thereby accelerating migration to 4GB/5GB.  Incentivising and promoting fibre connectivity for all new development construction. 3. Establishment of a GNCTD Digital Grid:  Establishing Common service ducts and utility corridors in GNCTD and highway road projects, and related elements.  Facilitating development of Open Access Next Generation Networks 4. Ensuring a holistic and harmonised approach for harnessing Emerging Technologies  Synergising deployment and adoption of new and emerging technologies by: i. Creating a roadmap for emerging technologies and its use in the communications sector, such as 5G, Artificial Intelligence, Robotics, Internet of Things, Cloud Computing and M2M. ii. Simplifying licensing and regulatory frameworks whilst ensuring appropriate security frameworks for IoT/M2M/future services and network elements incorporating international best practices. iii. Earmarking adequate licensed and unlicensed spectrum for IoT / M2M services  Enabling Hi-speed internet, Internet of Things and M2M by rollout of 5G technologies.  Establishing GNCTD as a hub for cloud computing, content hosting and delivery, and data communication systems and services.  Leveraging Artificial Intelligence and Big Data in a synchronized and effective manner to enhance the overall quality of service, spectrum management, network security and reliability.  Information provided in the plan enclosed Establishing Centres of Excellence including in Spectrum Management, Telecom Security and Next Generation Access Technologies.[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 939 5. Promoting Start-ups and SMEs:  Supporting Start-ups with various fiscal and non-fiscal benefits, including:  Academic collaborations, permissions for pilots and testing, concessions on imported software, mentoring support etc.  Promoting participation of Start-ups and SMEs in government procurement  Funding pilot deployments through USOF 6. Setting up of virtual schools: Govt. of NCT of Delhi will set up virtual schools to provide another channel to the public to pursue with getting education and skills in a formal virtual schooling. 7. Digital Delivery of Government Services: Government of NCT of Delhi will provide all its Government services to the citizens online as well as through mobile. The delivery of these services will be through secured Digi-Locker system. The citizen will use either web portal or UMANG platform to get the Government services. 8. Promotion of IT/ITES: Government of NCT of Delhi has already announced its policy to remove polluting industries from Delhi. Delhi Government will promote clean environment industries like IT and IT enabled services in Delhi. 9. Plans for provision of Public Wi Fi: In the current Wi Fi schemes of providing free wi-fi to the citizens of Delhi rental model is adopted. In this scheme all the bus stops (about 4000 in Nos) are covered. The data limit per user is 15 GB per month. By 2041, GNCTD, Delhi can plan to cover all the area with Wi Fi. This includes the Wi Fi access in all public vehicle and public place including schools, colleges, hospitals etc. The bandwidth at WiFi, Hotspots can go up to the speed of 1 GBPS per user. All the security concern should be taken care while planning the complete Wi Fi network for GNCTD. Smart Poles is the way forward to accelerate the growth. 10. Key infrastructure or special projects identified during the plan period, along with details of projects and their timelines:  A digitally enabled and connected city: Delhi shall need adequate infrastructure provisions to support the advent of higher service levels like network of 5G and above, full city fibre coverage, further integration of city's digital systems with loTs (Internet of Things), Artificial Intelligence (Al), Cloud Computing and Big Data etc. The highly equipped and digitally smart unified command and control centres set up by the local bodies can be the key drivers for effective urban management of Delhi.  With increased level of digitalization, data centres may be setup to meet the need for data storage, server management, etc. Such data centres may be developed by public and/or private agencies and can come up in industrial land use as per provisioned  Connectivity through fibre-optics is considered to be more efficient in terms of internet speed and reliability of services, "Fibre First Initiative" of NDCP 2018 and regulations of ROW Policy 2016 will facilitate augmentation of telecom infrastructure. Implementation of optic fibre shall be through collaborative models involving state government, local bodies and private sector as required for provision of shared telecommunication infrastructure.940 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]  Smart poles may be installed in public areas, comprising of CCTV cameras, air pollution monitoring sensors, telecom antenna, Wi-Fi hotspots/ microcells, solar lighting, public address and messaging systems, emergency call box etc., which in turn shall be connected to the digital systems of various city agencies. 11. Back-up plan for connectivity during emergencies/ disasters Developing a comprehensive plan for network preparedness, disaster response relief restoration and reconstruction  Strengthening network resilience by: i. Framing and enforcing standard operating procedures to be followed during disasters and natural calamities, including sectoral guidelines for disaster response and recovery applicable to various service providers.  Developing a Unified Emergency Response Mechanism by: ii. Creating an institutional framework with clearly defined roles and responsibilities, Standard Operating Procedures and technical guidelines iii. Enforcing obligations of service providers to share infrastructure, and ensure interoperability in emergency situations in a network-agnostic, operator – agnostic and technology-agnostic manner. ददल्ली मुख्य योजना-2041‍का‍ड्राफ्ट‍पाठ‍दस्तावेज‍और‍भूमम‍उपयोग‍प्‍लान‍उपयु्‍‍त‍अवमध‍के‍दररान‍सभी‍ काय्‍ददवसों‍म‍ें ररसेप्शन‍डेस्क‍मवकास‍मीनार,‍आई.पी.एस्टेट,‍नई‍ददल्ली-110002‍पर‍उपलब्ध‍रहगे ा। यह‍मनम्नमलमखत‍ ललक‍अथा्त्‍https://dda.org.in/hotlinks.aspx‍पर‍भी‍उपलब्‍ध‍रहगे ा।‍[भाग II—खण्‍ड 3(ii)] भारत‍का‍राजपत्र‍:‍असाधारण 941 ploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.

Continue your research