Date: 2016-10-06 Category: Public Private Partnership in India State: Union Government Country: India

Development of Sinnar-Nashik section of NH-50 (from kM-177.000 to km 201.350) in the State of Maharashtra with 4- lane on DBFOT [BOT (Toll)] basis under PPP ModeDevelopment, Operation and Maintenance of Hanumangarh to Abohar section of SH- 7A (up to Punjab border) on Design, Build, Finance, Operate and Transfer (DBFOT) Toll basis under PPP mode

Issued by Ministry of Finance · Department of Economic Affairs

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** This document summarizes the 74th meeting of the Empowered Institution (EI) held on October 6, 2016, regarding the Scheme for Financial Support to PPPs in Infrastructure (Viability Gap Funding Scheme). The meeting addressed two road sector proposals, one from the Ministry of Road Transport and Highways (MoRTH) concerning the Sinnar-Nashik section of NH-50 in Maharashtra, and another from the Government of Rajasthan (GoR) for the Hanumangarh to Abohar section of SH-7A. The document outlines the discussions and decisions made regarding these projects. **Key Points / Main Content** * **Maharashtra - Sinnar-Nashik NH-50 Project:** * Final approval granted for the development of the Sinnar-Nashik section of NH-50 on a DBFOT basis, with a total project cost of Rs 312.96 Crore. * Viability Gap Funding (VGF) support of Rs 120.51 Crore (38.51% of the project cost) approved, with Rs 62.592 Crore from the Government of India's VGF Scheme. * Project completion must be ensured on time with no extra compensation to the Concessionaire towards cost-overrun. * **Rajasthan - Hanumangarh to Abohar SH-7A Project:** * In-principle approval granted for the development, operation, and maintenance of the Hanumangarh to Abohar section of SH-7A through PPP on a DBFOT basis. * The concession period must be reduced to 19 years from the initially proposed 21 years. * The Government of Rajasthan (GoR) is required to obtain all necessary clearances, including environmental and forest clearances. * GoR must seek prior approval from EI for any changes in total project cost (TPC), scope of work, or project configuration. **Impact Analysis** **Government of Maharashtra (GoM)** * **Impact:** GoM is responsible for ensuring the on-time completion of the Sinnar-Nashik NH-50 project within the approved budget and VGF support. * **Action Required:** Monitor project progress, resolve any potential delays, and ensure no extra compensation is provided to the concessionaire for cost overruns. **Government of Rajasthan (GoR)** * **Impact:** GoR will develop, operate, and maintain the Hanumangarh to Abohar section of SH-7A within a 19-year concession period. * **Action Required:** Obtain all necessary clearances, reduce the concession period to 19 years, and seek EI approval for any project changes. **Ministry of Road Transport and Highways (MoRTH)** * **Impact:** Oversees the development of Sinnar-Nashik NH-50 and must ensure the project adheres to approved plans. * **Action Required:** Monitor the project's progress and provide necessary support to the GoM.

Key Entities Referenced

Scheme for Financial Support to PPPs in Infrastructure (Viability Gap Funding Scheme): A scheme by the Government of India to provide financial support to public-private partnership projects in infrastructure, also known as the VGF Scheme. Ministry of Road Transport and Highways: A ministry of the Government of India involved in infrastructure projects, which proposed a road project in the document. Government of Rajasthan: A state government, whose PWD presented a road project for approval in the document. Maharashtra: A state government, and the location of the Sinnar-Nashik NH-50 project discussed. Empowered Institution (EI): An institution established to approve projects under the Scheme for Financial Support to PPPs in Infrastructure
Official Source Record View Original Source →
See Full Document Text
F. No. 3ll2l20l6-PPP Govi:rnment of India MinistrY of Finance Departmen,t of Economic Affairs (Infrastruc e Section) North Block. New Delhi Subject: Record of Discussion of 74th It[,eeting of, the EnrLpowered Institution (EI) for the Scheme for Financial Support to PPPs in Infrastructure (\ziability Gap Funding Scheme). The undersigned is directed to enclose a copy of Record of Discussion of 74th Meeting of the EI for the grant of VGF under the Scheme for Financial. Support to PPPs in Infrastructure held on 6,h October ,2016 on below-mentic,ned 2 projects for information and necessary action. a) Development of Sinnar-Nashik section of NH-50 in the State of Maharashtra with 4-lane through DBFOT IBOT (Toll)] basis. b) Development, Operation and Maintenance of Hanumangarh to Abohar section of SH-7A (up to Punjab border) through PPP on DBFOT Toll basis. Encl: as above (Nitish Saini) Assistant Director (Infta) Tel No. 23095158 1. Dr. Arunish Chawla, Joint Secretary, Department of Expenditure, North Block, New Delhi. L. Shri Praveen Mahto, Adviser (PPP/PAMD), Niti Aayog, Yojana Bhawan, New Delhi. aJ. Shri R.K. Singh, Joint Secretary, \4inistry of Road Transport and Highways, Transport Bhawan, New Delhi 4. Chief Engineer (NH), Maharashtra PWD, Rashtra Maha Marg, Konkan Bhawan, 5tn Floor, Navi Mumbai- 400614. 5. Sh. D.B. Gupta, Additional Chief isecretary to Gover ent, Public Works Department, Government of Raj asthan, Secretariat, Jaipur. Copy to: 1. Sr. PPS to Additional Secretary (In'vestment), 2. PS to JS (Infra), 3. PS to Director (Infra), 4. PS to Director (PPP), DD (PPP) for uploading on pppinirLdia.gov.in website.F. No, 311212016- PPP Government of India Mini:stry of Finance DePartment of Economic A1 irs nfrastructure Section I Em porrruered I nstitutionr for the Scheme for Financ;ial Support to lPublic Private P:rrtnerships in lnfrastructure 74th Meeting held on October 6, 2016 Record hlote of The 74h meeti:ng of the Empowered Institution (EI), chaired by Additional Secretary (Investmrent), Departmen.t of Economic Affairs (DEA) was held on October 6,2076. The list of participants is attached. The EI noted that there were two road sector proposals for consideration for approval of viability gap funding (VGF) under the Government of India's Scheme for Financial Support to Public Pri.rate Partnerships in Infrastructure (VGF Scheme): a proposal from lvlinistry of RoaLd Transport and Highways (MoRTH) for final approval and anc,ther proposal lirom Government of Rajasthan for in-principle approval. The EC noted that the Scheme for Support to P'PPs in Infrastructure prescribes that VGF up to Rs. 100 Crore for each project may be sanctioned by the Empowered Institution (EI), proposals for VGF up to Rs. 200 Crore may be sanctioned by the EC, and amounts exceeding Rs. 200 Crore may be sanctioned by the EC, with the approval of the FinLance Minister. Hig A. Road sector proposal from Mirristry of Road Tr:rnsport and ays P.roposal from Giovernment of M.inistry of Road Transport and Highways (MoRTH) for gr t of :final approval forr Development of Sinnar-Nashik section of NH-50 (from krr-177.000 to km 201.350) in the State of Maharashtra with 4- lane through PPP on DBFOT IBOT (Toll)l basis. Project Details: Length: 25.31 Km.; Total Proiect Cost Rs. 312.96 Crore; Concession Period: 18 years inclrrding 2 years of construction period- Major development works/ structur,es: Major Bridge: 1 I'1o., Minor Bridges: 16 No.s, Major |unctions: 9 No.s, lMinor Junctions: 16 No.s, Bypass at Sinnar of length 9.50 km, VUPs: 9 No.s, PUP:4 No.s, Culverts:90 No.s, Service Road: 23.97krn. Toll Plaza: 1 No. at 193.90 km. VGF sought Rs 12-0.51 Crore (38.51o1, of TPC of Rs. 312.96 Crore) of which 20% i.e. Rs 62.592 Crore would be paid as VGF suPport from Ministry of Finance. 74th meeting of Empowered Institutiory October 6,2016 Record of Discussion Pagel of7 a2. Joint Secr etary (Infra) informerJ the EI that the Project with TPC of Rs 312.96 Crore with maximum admissibler VGF of Rs 725,.184 Crore $0% of TPC) was approved by PPPITC in its 48th meeting held on 1.3.12.2011 d by the Empowered Institution (EI) in il.s 36th meeting held on 01'.12.201I. 3. ]oint Secretary (Infra) further stated that RfQ for the Project was issued on 08.08.2009 with VG]F of Rs 120.51 Crore, or 38.51.% of T'PC, letter of award was issued on 15.02.2013. The Selected Bidder has formed an SPV which executed the Concession Agreement with Govemment of Mzrtrarashtra (GoM) on 31.07.201,3. Appointed Date of the Project is 30.04.20L5. Delay in notification of Appointed Date has been stated by authority to be on account of dellay in handing over of land due to High Court orders and also delay in financial closure. As per the executed Concession Agreement, construction period is 2 years. 4. Joint Secr etary (Infra) also statr:d that based on site requirements on account of development of the Project influerrce area in the int;ervening period, local demands and for providirLg safer improved services to the users, State P\AfD has recommended change of scope of tlae Projecf which was recommended by SFC for approval of the Competent Authority in its meeting held on 28.07.201,6, increasing the TPC by Rs 34.62 Crore or 77.06"/o of original TPC. As per the Concession Agreemen! cost c>f change in scope up to 0.25% of TPC is to be borne by the Concessionaire and balance would be reimbursed by the Authority. The Concessionaire has agreed to execuLte the proposed change in scope. 5. Joint Secretary (Infra) stated that reasons may be provided by the State for delay in seeking final approval by EI (by over 17 months from AD); how the work can be completed by 30.4.2077 when land is still not fully provided; and how the Project despite increase in TPC by 11..06% is viable with thr: same VGF which is over three years old. 6. The Chair desired to know in detail the reasons for delay in notifying Appointed Date. Superintendent Engineer, Public Works Department (PWD), Government of Maharashtra stated that over 200 faLrmers had approached the court of law regarding procedural flaw in land acquisition by Competent Authority for Land Acquisition (CALA) and the court had stayecl the acquisition for over 18 months. The Chair enquired whether land was not available at the time of signing the contract. Superintendent Engineer, PWD, Maharashtra replie<l that 3 (D) for over 80% of land acquisition was complete at the time of signing of the Concession Agreement however the process was chatrlenged in the court and hence the delay. 7. Joint Secretary (Infra) asked for the reasons for derlay in submission of documents final for proval by EI, even aftt:r the notificatiorL of Appointed Date. Executive Engineer, PWD, Maharashtra replied that even afte:r the Appointed Date there had been protests by farmers resulting; in the doubts rr:garding ac isition of balance 74th meeting of Empowered Institutiory October 6,2:.016 Record of Discussion Page 2 of 7 vportion of the land and peaceful possession of the $ame. Owing to this, the lenders were hesitant to complete the forrnalities for disbu.rsal. Now the issues are sorted out with the farme.rs and GovernmLent of Maharashtra has approached DEA for final approval. 8. The Chair desired to know whether the project is still viable at the same cost as the bid was received in 201.3 and r,vhether the Concr:ssionaire is still willing to carry out the work at the same cost. Executive Engineer,, PWD, Maharashtra stated that the Concessionaire has not demanded arry corrLpensation on account of cost escalation. Joint Secretary (Infra) asked whether this implies that the cost was overestimated at the time of biddirrg. Superintendent Engineer, MORTH stated that the cost of material has marginally decreased in the .[ast two years. Schedule of Rates (SOR) of various regions have also just marginally changed. This explains why the Concessionaire is v,'illing to carry out the work at the same cost. 9. Advisor, NITI Aayog asked whether construction would be completed on Scheduled Date of completion2g.0'4.2017. Superintendent Engineer, PWD stated that as per Statutory Auditor's reporf 37.02% work har; been completed on29.04.201.6 which satisfies the Project Milestone-2 as per the erecuted Concession Agreement. Progress of construction is satisfactory and is expected to be completed on the Scheduled Date of completion. Thre Chair asked whether there could be the risk of Concessionaire not completing thre construction after disbursement of VGF. Joint Secretary (Infra) clarified that VGF disbursal is pari passu with the lender's disbursal and after full equifiz investment. 10. All members of EI were in support to grant final approval for VGF support to the Project subject to the conditions that PWD, Government of Maharashtra would ensure that the Project is completed on time and there would not be any extra compensation to the Concessionaire towards cost-ov,errun. 11. The EI granted final approval to the Project "I)evelopment of Sinnar-Nashik section of NH-50 (from km 177.0001 to 201.350) in the State of Maharashtra with 4-lane through PPP on DBFOT IBOT (Toll)l basis" for TPC of Rs 312.96 Crore (with TPC of Rs 355.85 Crore as per the lenders' appraisal) with total VGF support of Rs l2O.51Crore (38.51% of TP(3) of which 2O"h i.e. Rs 62.592 Crore would be financed under the Government of India's Scheme for Financial Support to PPPs in Infrastructure (VGF Scheme). llhe Approval is srubject to conditions that PWD, Government of Maharashtra would ensure that the f'roject is completed on time and there would not be y extra cornpensation to the Concessionaire towards cost- overrun. 74th meeting of Empowered Instituiion, October 6,201,6 Record of Discussion Page 3 of 7B. Road sector proposal from Government of Rajasth principle approval for Deverlopment, Operation d Maintenance of Hanumangarh to Abohar section of SH- (up to Punjab border) through PPP on Design, Build, Finance, Operate and Transfer (DBFOT) Toll basis. Project Details: Length: 42.655 Km.; Total Project Cosh Rs. 51.50 Crore; Concession Period: 19 years inclrrding 1 year of construction period. Major development works/ structures: Minor Bridges: widening: 4 No.s, repairs and strengthening: 1 No., Culverts: widening: 12 No.s, r(sconstruction: 20 No.s, At-grade intersections: 19 l,lo.s, Longitudinal drains: 4 No.s, TolL Plaza: 1 No. at km 28.300, Bus shelters: 7 No.s. VGF sought Nil. However, actual VCIF would be based orrcompetitive bidding process. 11. Joint Secretary (Infra) informed the EI that the Project for Developmenf Operation and Maintenance of Hanumangarh to Abohar section of SH-7A (up to Punjab border) has total length of 42.655 km wotrld be developed by providing overlay and by widening and re;pairs of existing road including minor bridges, culverts etc. TPC of:the Project is Rs 51.50 Crore. 12. Additional Chief Engineer, PIND, Government of Rajasthan (GoR) made a presentation on the Project proposal and explainecl that the project road starts at Hanumangarh town which is urbzrn habitat and the first B kilometres of the road adjacent to the town has spill-over of urban agglomeration resulting in more traffic of 2-wheelers, 3-wheelers and non.rn otofized vehicles. 13. Joint Secretary (Infra) enquirec[ why the proposed Concession Period was 2'J, years while the projected traffic would exceed its dersign capacity in year 2035-36 as per the feasibility reporf i.e., the 79th year, assuming 2077-18 as the Construction year and based upon the average of traffic survey provided by the authority at kms 8 and 28. Additional Chief Engineer, PWD, Gotrl stated that the traffic at the proposed tollplaza at km 28.300 v,'ould exceed the design capacity in27"t year and not in the 19h yearr. joint Secretarlg finfra) desired 1,o know why the traffic survey was conducted atKm 8.000 and r,rrhether traffic profile of the o locations of the survey is significantly different oraring to any leakalges. Additional Chief Engineer, PWD, GoR explained that the traffic profiie is different because of vicinity to urb area in the first 8 kilometres arnd that o int3rsecting roads connecting to Kishangarh and Sa,ngaria start at ar.ound Km 3.000. 74th meeting of Empowered Institution, October 6,2016 Record of Discussion Page 4 of 714.JontSecretary (Infra) stated that since it is projer:ted that the first stretch (i.e., till km S) will exceed capacity by the 79th year, and user discomfort will require capacrty increase, it is unclear how a 21. year concession for the whoie length will be addressed. Superintendent Engineer, MORTH also stated that though the traffic at toll plaza does not exceed the design capacity of 15,000 PCUs in 21' years, it is not clear why Z-lane plus paved shoulder (PS) has not been proposed and just the development by o.izerlay has been proposed. Additional Chief Engineer, PWD, GoR stated that it is as per the transport policy of Government of Rajasthan. Superintendent ErLgineer, MORTF{ stated that though as per the policy it may be admissible, safefy ,tf the traffic has to be taken into aLccounf especially in the vicinity of urban area whLere significant traffic is of 213 - wheelers and non-motorized vehicles, paved shoulder is necessary so that main carriageway is not blocked. The Chair enquired about the incremental cost if paved shoulder is provided- Additional Chief Engineer, PWD, GoR stated that it would be around Rs 1 Crore per kilometer extra which means that the TPC would double. Furl.her, there are hard shoulders on that section of the rroad though not paved shoulders, 15. Since the Add.itional Chief ErLgineer, PWD, GrtR stated that an ROB is to be constructe d by the State under Clentral Road Fun,l (CRF) scheme, Chair asked if there was any risk of delay in the work as it wouldl affect the proposed concession. The State responded that it will ensure there is no rlelay on account of construction of ROB and State will also ensure the synchronization of ROB with the project in the Concession Agreement itself . 16. The Chair asked why the Concession Period should not be reduced to 79 years. Additional Chief Eingineer, PWD, GoR stated that the project is viable without VGF grant for 27 years' Concession Period. For L9 years, it may require grant depending on Corhpetitive bidding. Additional Chief Engineer, PWD, Rajasthan stated that the project was conceived on the basis of suo motu proposal for deveiopment of the project with 20 years concession period, offering prr:mium. While suo motu proposal was not considered, the project is now proposed to be bid-out on VGF as a bid- parameter. Advisor, NITI Aayog suggested that r:onsidering safety of the traffic either the Project nnay be redesigned with paved shoulders or the Concession Period may be reduced. 74ft meeting of Empowered Institutiory October 6,20L6 Record of Discussion Page 5 of 7 d yq17' After considering the views of the EI, Governme.t of R asthan to reduce the Concession period to 19 years. lopment, operation and Maintenance of Ha,numangarh to Abohar section of sH A( ___ _ _>Drvr. vl to /(fD'lDBl;nrFr OT) hT orliI r basis in the state oI' Raiasthan th vGF, ...,,.,+-*.,,+:^ri sfer per VGF a' Concession period would be reduce d. to 79 years from the 21 years. b' GoR shall obtain crearan,ces such as environment and forest arance before commencing the work for project site. c' GoR shat obtain prior ap,proval of EI on any change in Tpc, scope of work or project configuratiorL as noted above. The meeting ended with vote of thanlks to the Chair. eting of Empowered Institutiory October 6,2016 of Discussion o"'l 6of7E owered Institution (EI) for Scheme to to PPPs in in s c 74th Meeting on 6th 2016 I. 1. 2. . Sharmila Chavaly, jS (Infra) 3. Mr. Nitish Saini, Assistant Di (Infra) II. NITI Aavog 4. Mr. Praveen Mahto, Advisor ru. 5. Mr. Rajiv Wadhawan, Ioint ry. 6. Mr. Sanjeev Kumar, SE 7. Mr. R.P. Panda SE V. 8. Mr. R.P. Nighof SE 9. Mr. Y.A. patil, EE u. Government of Raiasthan Anoop 10. Mr. lshreshtha ACE 71. eting of Empowered Institutiory October 6,2016 of Discussion