Executive Summary & Key Takeaways

**Executive Summary** This report outlines the Ministry of Power’s progress and future projections for non-conventional electricity generation in India as of April 2026. It details current installed capacities, major government schemes, and regulatory shifts aimed at achieving 507,411 MW of non-conventional capacity by 2031-32. Key deadlines include the tapering of ISTS charge waivers starting June 2025 and the completion of several capacity targets by 2029-30. **Key Points / Main Content** * **Capacity Status and Projections** * Current non-conventional installed capacity stands at 215.5 GW out of a total 524 GW. * The National Electricity Plan (NEP) projects non-conventional capacity to reach 507,411 MW by 2031-32, led by solar (364,566 MW) and wind (121,895 MW). * As of January 2026, 154,830 MW of renewable capacity is under construction. * **Regulatory and Investment Framework** * Under Section 7 of the Electricity Act, 2003, setting up power plants is a de-licensed activity, provided technical grid standards are met. * 100% Foreign Direct Investment (FDI) is permitted under the automatic route. * Standard Bidding Guidelines have been issued for solar, wind, hybrid, and Firm & Dispatchable RE (FDRE) projects. * **Major Government Schemes** * Implementation of targeted schemes including PM-KUSUM, PM Surya Ghar Muft Bijli Yojana, and the National Green Hydrogen Mission. * The Production Linked Incentive (PLI) scheme is active to boost domestic manufacturing of high-efficiency solar PV modules. * Solar Parks and Ultra Mega Solar Power projects provide essential land and transmission infrastructure for developers. * **Financial Incentives and Infrastructure** * Inter-State Transmission System (ISTS) charges are 100% waived for solar and wind projects commissioned by June 30, 2025; the waiver tapers by 25% annually until June 2028. * Extended ISTS waivers apply to BESS and Hydro PSP projects (June 2028), Green Hydrogen (December 2030), and Offshore Wind (December 2032). * Viability Gap Funding (VGF) is approved for BESS (13.22 GWh and 30 GWh phases) and offshore wind projects. * **Procurement and Consumption Mandates** * A bidding trajectory of 50 GW per annum has been set for Renewable Energy Implementing Agencies (REIAs) from FY 2023-24 to FY 2027-28. * Renewable Consumption Obligation (RCO) trajectories are notified until 2029-30, including consumption from decentralized RE sources. **Impact Analysis** **Power Generating Companies** **Impact:** Benefit from a de-licensed regulatory environment and infrastructure support via the Green Energy Corridor and Solar Parks. **Action Required:** Must ensure all generating stations comply with technical standards relating to grid connectivity. **Renewable Energy Developers** **Impact:** Access to financial support through VGF, ISTS charge waivers, and structured bidding trajectories. **Action Required:** Must commission projects before specific deadlines (e.g., June 2025 for full ISTS waiver) to maximize financial benefits. **Designated Consumers** **Impact:** Subject to mandatory Renewable Consumption Obligation (RCO) targets through 2029-30. **Action Required:** Must meet specified RE consumption levels to avoid penalties under the Energy Conservation Act, 2001. **Solar PV Manufacturers** **Impact:** Eligible for fiscal incentives under the PLI scheme for high-efficiency modules. **Action Required:** Enhance domestic production capabilities to align with government module efficiency and capacity targets.

Key Entities Referenced

Electricity Act, 2003: The primary legal framework cited for the de-licensed status of setting up, operating, and maintaining power plants in India. National Electricity Plan (NEP): A policy document prepared by the Central Electricity Authority projecting installed generation capacity and non-conventional energy targets through 2031-32. Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-KUSUM): A key government scheme mentioned for harnessing non-conventional energy potential to provide energy security for farmers. Renewable Consumption Obligation (RCO): A regulatory mandate under the Energy Conservation Act 2001 requiring designated consumers to meet specific renewable energy consumption targets. Production Linked Incentive (PLI) Scheme: An initiative implemented to increase domestic manufacturing capacity for high-efficiency solar PV modules.
Official Source Record View Original Source →
See Full Document Text
Ministry of Power ELECTRICITY GENERATION FROM NON- CONVENTIONAL SOURCES Posted On: 02 APR 2026 3:55PM by PIB Delhi State wise electricity generation from non-conventional energy sources (i.e. Wind, Solar, Biomass, Bagasse, Small Hydro & Others- Waste to energy, etc.) in the country including the State of Maharashtra for last five Financial Years (FY) and current FY (tillFeb2026) is given at Table. National Electricity Plan (NEP) prepared by Central Electricity Authority (CEA) projects ‘Installed Generation Capacity’ by 2031- 32 to be around 8,73,736 MW which includes about 5,07,411 MW Capacity non-conventional energy sources i.e. 3,64,566 MW Solar, 1,21,895 MW Wind, 15,500 MW Biomass, 5,450 MW Small Hydro. As of now, out of total 524 GW of installed generation capacity, about 215.5 GW is from non-conventional sources. As per Section 7 of Electricity Act, 2003 setting up of a power plant is a de-licensed activity in the country. Any generating company may establish, operate and maintain a generating station without requiring a license under Electricity Act, 2003 if it complies with the technical standards relating to connectivity with the grid. The Government of India has also implemented various measures and initiatives to harness the non- conventional energy potential especially in the country. These include, inter-alia, the following: i. Schemes such as Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-KUSUM), PM Surya Ghar Muft Bijli Yojana, National Programme on High Efficiency Solar PV Modules, New Solar Power Scheme (for Tribal and PVTG Habitations/Villages) under Pradhan Mantri Janjati Adivasi Nyaya Maha Abhiyan (PM JANMAN) and Dharti Aabha Janjatiya Gram Utkarsh Abhiyan (DA JGUA), National Green Hydrogen Mission, Viability Gap Funding (VGF) Scheme for Offshore Wind Energy Projects have been launched. ii. Scheme for setting up of Solar Parks and Ultra Mega Solar Power projects is being implemented to provide land and transmission to Renewable Energy (RE) developers for installation of RE projects at large scale. In addition to above, the Government of India has taken several steps and initiatives to promote and accelerate renewable energy capacity in the country as below: i. 100% Inter State Transmission System (ISTS) charges have been waived for inter-state sale of solar and wind power for projects to be commissioned by 30th June 2025 (with waiver tapering off 25% annually till June 2028), for co-located BESS projects commissioned by June 2028, for Hydro PSP projects where construction work awarded by June 2028, for Green Hydrogen Projectscommissioned till December 2030 and for offshore wind projects commissioned till December 2032. ii. Standard Bidding Guidelines for tariff based competitive bidding process for procurement of Power from Grid Connected Solar, Wind, Wind-Solar Hybrid and Firm & Dispatchable RE (FDRE) projects have been issued. iii. Ministry of New & Renewable Energy (MNRE) has issued Bidding Trajectory for issuance of RE power procurement bids of 50 GW per annum by ‘Renewable Energy Implementing Agencies’ (REIAs) from FY 2023-24 to FY 2027-28. iv. Foreign Direct Investment (FDI) has been permitted up to 100 percent under the automatic route. v. Laying of new transmission lines and creating new sub-station capacity has been supported under the Green Energy Corridor Scheme for evacuation of renewable power vi. To augment transmission infrastructure needed for steep RE trajectory, transmission plan has been prepared till 2032. vii. Government of India, in September 2023, approved a Viability Gap Funding (VGF) scheme for development of Battery Energy Storage Systems (BESS). BESS capacity of 13.22 GWh is under implementation with a budgetary allocation of Rs 3,760 Cr. under this scheme. Considering the increasing demand of BESS, Ministry of Power, in June 2025, has approved another VGF scheme for development of 30 GWh BESS capacity with a financial support of Rs 5,400 Cr from Power System Development Fund (PSDF). viii. To boost RE consumption, Renewable Purchase Obligation (RPO) followed by Renewable Consumption Obligation (RCO) trajectory has been notified till 2029-30. The RCO which is applicable to all designated consumers under the Energy Conservation Act 2001 will attract penalties on non-compliance. RCO also includes specified quantum of consumption from Decentralized Renewable Energy sources. ix. “Strategy for Establishments of Offshore Wind Energy Projects” has been issued. x. To achieve the objective of increased domestic production of Solar PV Modules, the Govt. of India is implementing the Production Linked Incentive (PLI) scheme for High Efficiency Solar PV Modules. 1,54,830 MW Renewable Capacity including non-conventional energy sources i.e. 64,670 MW of Solar, 6,490 MW of Wind and 59,990 MW Hybrid power is under construction (till January 2026) while 47,920 MW of Renewable Capacity including non-conventional energy sources i.e. 35,440 MW of Solar and 10,080 MW Hybrid Power is at various stages of planning and targeted to be completed by 2029-30. TableState wise electricity generation from non-conventional energy sources (i.e. Wind, Solar, Biomass, Bagasse, Small Hydro & Others- Waste to energy, etc.) in the country including in the State of Maharashtra for the Financial Year 2020-21: (All figures in Million Units) Name of Wind Solar Biomass Bagasse Small Others Total State/UT Hydro (Waste to energy, etc) Chandigarh 0.00 10.16 0.00 0.00 0.00 0.00 10.16 Delhi 0.00 189.99 0.00 0.00 0.00 236.71 426.70 Haryana 0.00 162.95 178.88 142.34 276.58 0.00 760.75 Himachal 0.00 36.52 0.00 0.00 2,123.78 0.00 2,160.30 Pradesh Jammu & 0.00 9.42 0.00 0.00 429.88 0.00 439.29 Kashmir Ladakh 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Punjab 0.00 1,356.48 585.99 231.50 690.33 0.17 2,864.47 Rajasthan 5,708.27 10,384.24 413.24 0.00 10.64 0.00 16,516.38 Uttar Pradesh 0.00 1,856.19 135.82 3,590.87 164.91 0.00 5,747.78 Uttarakhand 0.00 329.64 0.00 85.33 821.88 0.00 1,236.85 Northern 5,708.27 14,335.59 1,313.92 4,050.03 4,518.00 236.88 30,162.68 Region Chhattisgarh 0.00 370.80 1,089.32 28.25 145.52 0.00 1,633.89 Gujarat 13,058.52 4,633.81 43.15 19.37 211.94 10.61 17,977.39 Madhya 3,913.45 4,202.03 0.48 82.57 281.76 37.57 8,517.86 Pradesh Maharashtra 6,384.74 3,089.46 328.23 3,627.43 802.71 0.10 14,232.67Dadra and 0.00 11.96 0.00 0.00 0.00 0.00 11.96 Nagar Haveli Daman & Diu 0.00 29.52 10.53 0.00 0.00 0.00 40.04 Goa 0.00 1.46 0.00 0.00 0.00 0.00 1.46 Western 23,356.70 12,339.03 1,471.71 3,757.61 1,441.93 48.27 42,415.27 Region Andhra 6,557.75 6,956.10 135.21 67.66 351.23 65.88 14,133.83 Pradesh Telangana 220.91 6,351.04 164.11 61.00 67.27 69.05 6,933.37 Karnataka 9,610.91 13,238.86 211.79 2,589.09 2,199.68 0.00 27,850.33 Kerala 130.42 275.44 0.00 45.68 640.58 0.01 1,092.12 Tamil Nadu 14,564.99 6,115.48 152.23 581.57 244.77 0.00 21,659.05 Lakshadweep 0.00 0.45 0.00 0.00 0.00 0.00 0.45 Puducherry 0.00 6.39 0.00 0.00 0.00 0.00 6.39 Southern 31,084.98 32,943.75 663.34 3,344.99 3,503.54 134.93 71,675.53 Region Andaman & 0.00 24.82 0.00 0.00 14.69 0.00 39.51 Nicobar Islands Bihar 0.00 160.63 21.30 1.48 43.20 0.00 226.61 Jharkhand 0.00 17.16 0.00 0.00 9.31 0.00 26.47 Orissa 0.00 476.26 42.71 0.00 358.80 0.00 877.77 Sikkim 0.00 0.00 0.00 0.00 55.96 0.00 55.96 West Bengal 0.00 73.92 0.00 148.73 107.06 1,200.99 1,530.70 Eastern 0.00 752.78 64.01 150.21 589.03 1,200.99 2,757.01 RegionArunachal 0.00 1.54 0.00 0.00 0.55 0.00 2.10 Pradesh Assam 0.00 13.37 0.00 0.00 38.15 0.00 51.51 Manipur 0.00 7.71 0.00 0.00 0.00 0.00 7.71 Meghalaya 0.00 0.00 0.00 0.00 56.79 0.00 56.79 Mizoram 0.00 2.45 0.00 0.00 31.07 0.00 33.52 Nagaland 0.00 0.00 0.00 0.00 69.77 0.00 69.77 Tripura 0.00 6.04 0.00 0.00 9.58 0.00 15.62 North Eastern 0.00 31.11 0.00 0.00 205.91 0.00 237.02 Region All India Total 60,149.95 60,402.26 3,512.98 11,302.85 10,258.41 1,621.06 1,47,247.51 State wise electricity generation from non-conventional energy sources (i.e. Wind, Solar, Biomass, Bagasse, Small Hydro & Others- Waste to energy, etc.) in the country including in the State of Maharashtra for the Financial Year 2021-22: (All figures in Million Units) Name of Wind Solar Biomass Bagasse Small Others Total State/UT Hydro (Waste to energy, etc) Chandigarh 0.00 14.19 0.00 0.00 0.00 0.00 14.19 Delhi 0.00 225.84 0.00 0.00 0.00 232.89 458.73 Haryana 0.00 572.85 171.60 96.75 270.13 24.09 1,135.42 Himachal 0.00 44.29 0.00 0.00 1,999.47 0.00 2,043.76 PradeshJammu & 0.00 1.71 0.00 0.00 414.10 0.00 415.81 Kashmir Ladakh 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Punjab 0.00 1,473.41 576.83 208.30 983.37 0.24 3,242.15 Rajasthan 6,493.19 17,219.88 378.40 0.00 7.85 0.00 24,099.31 Uttar Pradesh 0.00 2,900.41 85.20 3,160.39 162.54 20.40 6,328.94 Uttarakhand 0.00 301.60 0.00 244.02 326.70 0.00 872.32 Northern 6,493.19 22,754.17 1,212.03 3,709.46 4,164.16 277.62 38,610.64 Region Chhattisgarh 0.00 436.56 1,307.27 8.70 185.67 0.00 1,938.21 Gujarat 17,854.77 6,774.50 0.00 18.16 192.10 0.00 24,839.53 Madhya 4,346.66 4,006.70 25.35 82.20 221.43 34.40 8,716.73 Pradesh Maharashtra 7,085.98 3,187.18 316.79 4,468.31 787.16 0.22 15,845.64 Dadra and 0.00 49.16 0.00 0.00 0.00 0.00 49.16 Nagar Haveli Daman & Diu 0.00 35.35 12.32 0.00 0.00 0.00 47.67 Goa 0.00 15.93 0.00 0.00 0.00 0.89 16.82 Western 29,287.41 14,505.37 1,661.73 4,577.38 1,386.36 35.51 51,453.76 Region Andhra 7,134.58 7,832.51 104.85 72.70 384.08 133.88 15,662.61 Pradesh Telangana 275.69 6,536.94 111.13 103.95 91.00 227.20 7,345.89 Karnataka 9,491.62 13,169.43 174.08 3,338.24 2,460.91 0.00 28,634.28 Kerala 136.41 496.93 0.00 48.92 932.37 0.00 1,614.62Tamil Nadu 15,821.18 7,172.88 116.66 657.40 293.17 0.00 24,061.28 Lakshadweep 0.00 0.30 0.00 0.00 0.00 0.00 0.30 Puducherry 0.00 12.24 0.00 0.00 0.00 0.00 12.24 Southern 32,859.47 35,221.23 506.71 4,221.20 4,161.53 361.08 77,331.22 Region Andaman & 0.00 21.51 0.00 0.00 13.26 0.00 34.77 Nicobar Islands Bihar 0.00 163.08 2.14 65.84 8.77 0.00 239.83 Jharkhand 0.00 18.21 0.00 0.00 10.49 0.00 28.71 Orissa 0.00 603.71 100.08 0.00 377.32 0.00 1,081.10 Sikkim 0.00 0.00 0.00 0.00 12.35 0.00 12.35 West Bengal 0.00 98.24 0.00 0.00 152.90 1,593.96 1,845.09 Eastern 0.00 904.75 102.22 65.84 575.09 1,593.96 3,241.86 Region Arunachal 0.00 1.72 0.00 0.00 0.41 0.00 2.13 Pradesh Assam 0.00 81.64 0.00 0.00 40.46 0.00 122.10 Manipur 0.00 6.72 0.00 0.00 0.00 0.00 6.72 Meghalaya 0.00 0.47 0.00 0.00 44.21 0.00 44.68 Mizoram 0.00 1.68 0.00 0.00 26.41 0.00 28.09 Nagaland 0.00 0.00 0.00 0.00 63.47 0.00 63.47 Tripura 0.00 6.18 0.00 0.00 1.44 0.00 7.62 North Eastern 0.00 98.41 0.00 0.00 176.41 0.00 274.82 RegionAll India Total 68,640.07 73,483.94 3,482.70 12,573.88 10,463.55 2,268.17 1,70,912.30 State wise electricity generation from non-conventional energy sources (i.e. Wind, Solar, Biomass, Bagasse, Small Hydro & Others- Waste to energy, etc.) in the country including in the State of Maharashtra for the Financial Year 2022-23: (All figures in Million Units) Name of Wind Solar Biomass Bagasse Small Others Total State/UT Hydro (Waste to energy, etc) Chandigarh 0.00 12.61 0.00 0.00 0.00 0.00 12.61 Delhi 0.00 236.11 0.00 0.00 0.00 294.09 530.20 Haryana 0.00 555.20 356.07 203.01 241.90 63.55 1,419.73 Himachal 0.00 58.76 0.00 0.00 2,854.07 0.00 2,912.83 Pradesh Jammu & 0.00 0.00 0.00 0.00 393.20 0.00 393.20 Kashmir Ladakh 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Punjab 0.00 2,778.66 497.68 210.76 682.48 0.00 4,169.58 Rajasthan 6,111.41 34,474.43 397.05 0.00 7.17 0.00 40,990.05 Uttar Pradesh 0.00 3,674.02 66.35 3,183.67 234.69 58.45 7,217.18 Uttarakhand 0.00 331.80 0.00 248.52 352.07 0.00 932.39 Northern 6,111.41 42,121.59 1,317.15 3,845.96 4,765.58 416.08 58,577.77 Region Chhattisgarh 0.00 635.42 1,194.60 17.10 155.92 0.00 2,003.05 Gujarat 19,206.22 10,335.32 0.00 5.76 213.10 2.24 29,762.63Madhya 4,486.72 3,839.30 38.76 113.05 357.97 36.93 8,872.72 Pradesh Maharashtra 7,243.06 4,387.85 236.48 4,572.03 766.73 0.44 17,206.59 Dadra and 0.00 27.40 3.22 0.00 0.00 0.00 30.62 Nagar Haveli and Daman and Diu Goa 0.00 14.87 0.00 0.00 0.00 5.09 19.96 Western 30,935.99 19,240.16 1,473.06 4,707.94 1,493.72 44.70 57,895.56 Region Andhra 7,426.46 8,140.72 54.86 99.93 410.90 279.04 16,411.91 Pradesh Telangana 279.23 6,745.46 21.48 132.94 91.71 159.08 7,429.89 Karnataka 9,967.89 14,153.79 106.90 3,037.31 2,308.59 0.00 29,574.48 Kerala 179.32 879.75 0.00 62.85 824.34 0.00 1,946.26 Tamil Nadu 16,913.85 9,419.39 126.93 869.56 296.71 0.00 27,626.45 Lakshadweep 0.00 0.10 0.00 0.00 0.00 0.00 0.10 Puducherry 0.00 12.24 0.00 0.00 0.00 0.00 12.24 Southern 34,766.76 39,351.45 310.17 4,202.58 3,932.25 438.12 83,001.33 Region Andaman & 0.00 23.94 0.00 0.00 13.94 0.00 37.88 Nicobar Islands Bihar 0.00 169.53 0.00 106.68 12.63 0.00 288.85 Jharkhand 0.00 19.70 0.00 0.00 2.40 0.00 22.10 Odisha 0.00 706.24 60.95 0.00 424.92 0.00 1,192.10 Sikkim 0.00 0.00 0.00 0.00 12.35 0.00 12.35West Bengal 0.00 125.04 0.00 0.00 204.44 1,629.64 1,959.12 Eastern Region 0.00 1,044.45 60.95 106.68 670.69 1,629.64 3,512.41 Arunachal 0.00 22.27 0.00 0.00 2.55 0.03 24.85 Pradesh Assam 0.00 216.35 0.00 0.00 62.66 0.00 279.01 Manipur 0.00 8.17 0.00 0.00 0.00 0.63 8.79 Meghalaya 0.00 0.00 0.00 0.00 72.16 0.00 72.16 Mizoram 0.00 3.21 0.00 0.00 59.06 0.00 62.27 Nagaland 0.00 0.00 0.00 0.00 111.95 0.00 111.95 Tripura 0.00 6.58 0.00 0.00 0.00 0.00 6.58 North Eastern 0.00 256.58 0.00 0.00 308.38 0.65 565.61 Region All India Total 71,814.16 1,02,014.24 3,161.32 12,863.16 11,170.61 2,529.18 2,03,552.68 State wise electricity generation from non-conventional energy sources (i.e. Wind, Solar, Biomass, Bagasse, Small Hydro & Others- Waste to energy, etc.) in the country including in the State of Maharashtra forthe Financial Year 2023-24: (All figures in Million Units) Name of Wind Solar Biomass Bagasse Small Others(Waste Total State/UT Hydro to energy, etc) Chandigarh 0.00 11.70 0.00 0.00 0.00 0.00 11.70 Delhi 0.00 206.53 0.00 0.00 0.00 522.28 728.81 Haryana 0.00 992.91 294.12 83.60 222.05 58.82 1,651.50 Himachal 0.00 59.54 0.00 0.00 2,526.98 0.00 2,586.52 PradeshJammu & 0.00 0.00 0.00 0.00 408.69 0.00 408.69 Kashmir Ladakh 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Punjab 0.00 2,673.99 613.44 197.99 636.97 0.00 4,122.40 Rajasthan 8,390.67 38,363.28 387.55 0.00 7.45 0.00 47,148.96 Uttar 0.00 3,971.31 46.65 2,923.55 175.24 84.85 7,201.59 Pradesh Uttarakhand 0.00 331.80 0.00 248.52 350.62 0.00 930.94 Northern 8,390.67 46,611.07 1,341.76 3,453.66 4,328.01 665.95 64,791.12 Region Chhattisgarh 0.00 943.75 1,368.61 19.54 145.54 0.00 2,477.44 Gujarat 24,794.50 13,468.91 0.00 2.13 217.68 0.00 38,483.22 Madhya 4,949.78 4,025.19 84.62 97.01 469.60 28.83 9,655.02 Pradesh Maharashtra 8,228.97 5,814.13 304.61 3,495.82 888.48 33.40 18,765.41 Dadra and 0.00 15.74 13.12 0.00 0.00 0.00 28.86 Nagar Haveli and Daman and Diu Goa 0.00 59.99 0.00 0.00 0.00 7.96 67.95 Western 37,973.25 24,327.70 1,770.96 3,614.50 1,721.30 70.19 69,477.90 Region Andhra 8,644.00 8,300.03 18.75 66.63 127.10 307.97 17,464.48 Pradesh Telangana 304.63 6,884.68 10.57 95.08 58.87 155.29 7,509.10 Karnataka 10,950.20 15,404.09 47.45 2,754.06 1,370.76 0.00 30,526.55 Kerala 214.53 1,195.28 0.00 78.08 716.31 0.04 2,204.24Tamil Nadu 16,908.08 11,737.48 129.14 622.61 206.00 0.00 29,603.31 Lakshadweep 0.00 0.09 0.00 0.00 0.00 0.00 0.09 Puducherry 0.00 12.24 0.00 0.00 0.00 0.00 12.24 Southern 37,021.43 43,533.89 205.91 3,616.46 2,479.03 463.31 87,320.02 Region Andaman & 0.00 27.50 0.00 0.00 12.00 0.00 39.50 Nicobar Islands Bihar 0.00 195.19 0.00 140.98 5.92 0.00 342.08 Jharkhand 0.00 17.64 0.00 0.00 5.52 0.00 23.16 Odisha 0.00 757.69 96.07 0.00 407.97 0.00 1,261.72 Sikkim 0.00 0.00 0.00 0.00 12.35 0.00 12.35 West Bengal 0.00 168.32 2.49 0.00 204.46 1,545.13 1,920.39 Eastern 0.00 1,166.33 98.55 140.98 648.22 1,545.13 3,599.20 Region Arunachal 0.00 1.89 0.00 0.00 0.66 0.00 2.55 Pradesh Assam 0.00 316.31 0.00 0.00 64.20 0.75 381.26 Manipur 0.00 7.73 0.00 0.00 0.00 1.23 8.96 Meghalaya 0.00 0.00 0.00 0.00 66.55 0.00 66.55 Mizoram 0.00 3.19 0.00 0.00 95.93 0.00 99.11 Nagaland 0.00 0.00 0.00 0.00 81.14 0.00 81.14 Tripura 0.00 7.01 0.00 0.00 0.00 0.00 7.01 North 0.00 336.12 0.00 0.00 308.48 1.98 646.59 Eastern RegionAll India 83,385.35 1,15,975.11 3,417.19 10,825.59 9,485.04 2,746.55 2,25,834.83 Total State wise electricity generation from non-conventional energy sources (i.e. Wind, Solar, Biomass, Bagasse, Small Hydro & Others- Waste to energy, etc.) in the country including in the State of Maharashtra for the Financial Year 2024-25: (All figures in Million Units) Name of Wind Solar Biomass Bagasse Small Others Total State/UT Hydro (Waste to energy, etc) Chandigarh 0.00 8.79 0.00 0.00 0.00 0.00 8.79 Delhi 0.00 206.53 0.00 0.00 0.00 542.41 748.95 Haryana 0.00 1,470.02 359.23 44.60 314.64 49.13 2,237.62 Himachal 0.00 107.24 0.00 0.00 3,040.90 0.00 3,148.14 Pradesh Jammu & 0.00 0.00 0.00 0.00 395.17 0.00 395.17 Kashmir Ladakh 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Punjab 0.00 1,372.73 692.06 348.11 734.01 0.00 3,146.91 Rajasthan 6,941.26 49,101.62 400.85 0.00 4.15 0.00 56,447.88 Uttar Pradesh 0.00 4,966.06 76.48 2,457.35 179.00 29.88 7,708.76 Uttarakhand 0.00 331.80 0.00 248.52 353.40 0.00 933.72 Northern 6,941.26 57,564.79 1,528.62 3,098.58 5,021.27 621.42 74,775.94 Region Chhattisgarh 0.00 1,523.27 1,543.26 20.05 139.34 0.00 3,225.93 Gujarat 25,440.90 20,219.48 107.62 0.00 205.98 0.00 45,973.98Madhya 4,712.84 7,123.73 61.95 121.55 482.19 65.06 12,567.32 Pradesh Maharashtra 7,659.71 7,725.20 259.41 3,001.04 855.48 90.35 19,591.19 Dadra and 0.00 15.87 12.76 0.00 0.00 0.00 28.63 Nagar Haveli and Daman and Diu Goa 0.00 57.11 0.00 0.00 0.00 8.14 65.24 Western Region 37,813.45 36,664.67 1,984.99 3,142.65 1,683.00 163.54 81,452.29 Andhra 7,235.04 7,993.48 19.61 52.34 294.36 307.40 15,902.23 Pradesh Telangana 290.60 6,941.75 12.61 64.28 74.48 257.96 7,641.70 Karnataka 13,620.33 15,699.63 32.15 2,474.25 2,259.49 0.00 34,085.85 Kerala 119.85 1,711.83 0.00 20.53 814.29 56.64 2,723.14 Tamil Nadu 17,326.66 15,739.30 106.90 377.99 256.60 0.00 33,807.45 Lakshadweep 0.00 0.09 0.00 0.00 0.00 0.00 0.09 Puducherry 0.00 12.24 0.00 0.00 0.00 0.00 12.24 Southern 38,592.48 48,098.33 171.27 2,989.39 3,699.22 622.01 94,172.69 Region Andaman & 0.00 24.59 0.00 0.00 14.40 0.00 39.00 Nicobar Islands Bihar 0.00 325.86 0.00 104.70 14.54 0.00 445.10 Jharkhand 0.00 17.64 0.00 0.00 6.25 0.00 23.89 Odisha 0.00 786.75 53.80 0.00 457.20 0.00 1,297.75 Sikkim 0.00 0.00 0.00 0.00 12.35 0.00 12.35 West Bengal 0.00 320.75 0.00 0.00 183.30 1,462.46 1,966.51Eastern Region 0.00 1,475.60 53.80 104.70 688.04 1,462.46 3,784.60 Arunachal 0.00 1.30 0.00 0.00 0.58 0.00 1.88 Pradesh Assam 0.00 305.52 0.00 0.00 208.55 0.30 514.36 Manipur 0.00 8.68 0.00 0.00 0.00 0.00 8.68 Meghalaya 0.00 0.00 0.00 0.00 116.65 0.00 116.65 Mizoram 0.00 25.38 0.00 0.00 52.11 0.00 77.49 Nagaland 0.00 0.00 0.00 0.00 98.62 0.00 98.62 Tripura 0.00 5.97 0.00 0.00 0.00 0.00 5.97 North Eastern 0.00 346.85 0.00 0.00 476.51 0.30 823.66 Region All India Total 83,347.19 1,44,150.23 3,738.67 9,335.32 11,568.04 2,869.73 2,55,009.19 State wise electricity generation from non-conventional energy sources (i.e. Wind, Solar, Biomass, Bagasse, Small Hydro & Others- Waste to energy, etc.) in the country including in the State of Maharashtra for the current Financial Year 2025-26(till Feb., 2026): (All figures in Million Units) Name of Wind Solar Biomass Bagasse Small Others Total State/UT Hydro (Waste to energy,etc.) Chandigarh 0.00 7.27 0.00 0.00 0 .00 0.00 7.27 Delhi 0.00 189.32 0.00 0.00 0 .00 446.17 635.49 Haryana 0.00 1,448.01 368.30 62.80 2 13.15 49.52 2,141.78 Himachal 0.00 179.19 0.00 0.00 2 ,605.70 0.00 2,784.89 Pradesh Jammu & 0.00 0.00 0.00 0.00 3 88.32 0.00 388.32 Kashmir Ladakh 0.00 0.00 0.00 0.00 0 .00 0.00 0.00Punjab 0.00 1,240.84 628.03 200.97 4 24.01 0.00 2,493.85 Rajasthan 6,737.16 54,226.99 700.13 0.00 5 .39 0.00 61,669.6 Uttar 0.00 4,731.43 95.79 2,048.91 8 0.08 32.92 6,989.12 Pradesh Uttarakhand 0.00 304.15 0.00 227.81 3 23.95 0.00 855.91 Northern 6,737.16 62,327.20 1,792.25 2,540.48 4 ,040.59 528.61 77,966.3 Region Chhattisgarh 0.00 1,671.91 1,327.09 7.58 2 40.35 0.00 3,246.93 Gujarat 31,404.95 23,245.13 149.40 0.00 1 74.99 0.00 54,974.4 Madhya 4,398.77 7,274.96 64.55 62.43 4 77.06 50.34 12,328.1 Pradesh Maharashtra 8,214.56 9,301.43 236.69 3,044.52 8 48.58 52.78 21,698.5 Dadra and 0.00 18.49 11.59 0.00 0 .00 0.00 30.08 Nagar Haveli and Daman and Diu Goa 0.00 52.35 0.00 0.00 0 .00 7.46 59.81 Western 44,018.28 41,564.27 1,789.33 3,114.53 1 ,740.97 110.58 92,337.9 Region Andhra 8,579.21 7,643.91 13.38 41.62 3 89.12 347.75 17,014.9 Pradesh Telangana 275.91 6,205.39 19.32 66.59 8 3.25 286.61 6,937.08 Karnataka 17,811.83 16,116.89 41.99 3,134.30 2 ,734.32 6.25 39,845.5 Kerala 126.24 2,127.50 0.00 0.00 9 09.29 88.89 3,251.91 Tamil Nadu 23,699.39 17,504.97 0.00 173.39 2 95.61 0.00 41,673.3 Lakshadweep 0.00 0.08 0.00 0.00 0 .00 0.00 0.08Puducherry 0.00 11.22 0.00 0.00 0 .00 0.00 11.22 Southern 50,492.57 49,609.96 74.69 3,415.90 4 ,411.59 729.50 1,08,734 Region Andaman & 0.00 15.37 0.00 0.00 1 3.12 0.00 28.50 Nicobar Islands Bihar 0.00 294.00 0.00 71.96 2 1.19 0.00 387.15 Jharkhand 0.00 16.17 0.00 0.00 1 8.95 0.00 35.12 Odisha 0.00 822.60 76.00 0.00 5 89.35 0.00 1,487.95 Sikkim 0.00 0.00 0.00 0.00 1 1.33 0.00 11.33 West Bengal 0.00 377.12 0.00 0.00 1 75.65 1,334.66 1,887.43 Eastern 0.00 1,525.26 76.00 71.96 8 29.59 1,334.66 3,837.46 Region Arunachal 0.00 2.29 0.00 0.00 0 .33 0.00 2.62 Pradesh Assam 0.00 297.80 0.00 0.00 1 36.47 0.47 434.75 Manipur 0.00 7.88 0.00 0.00 0 .00 0.00 7.88 Meghalaya 0.00 0.00 0.00 0.00 1 46.58 0.00 146.58 Mizoram 0.00 27.41 0.00 0.00 2 2.85 0.00 50.26 Nagaland 0.00 0.00 0.00 0.00 9 4.80 0.00 94.80 Tripura 0.00 8.40 0.00 0.00 0 .00 0.00 8.40 North 0.00 343.78 0.00 0.00 4 01.04 0.47 745.30 Eastern Region All India 1,01,248.02 1,55,370.47 3,732.27 9,142.87 1 1,423.78 2,703.82 2,83,621 TotalThis Information was given by The Minister of State in the Ministry Of Power , Shri Shripad Naik, in a written reply in the Lok Sabha today. ********* NR/MD/AP (Release ID: 2248342) Visitor Counter : 189