Home India Ministry of Heavy Industries EXPANSION OF EV CHARGING INFRASTRUCTURE...
Date: 2025-12-12 Category: Press Release State: Union Government Country: India

EXPANSION OF EV CHARGING INFRASTRUCTURE

Issued by Ministry of Heavy Industries · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** This document, dated December 12, 2023, details the expansion of EV charging infrastructure in India. It outlines updated EV battery standards from the Ministry of Road Transport and Highways (MoRTH) and safety standards from the Bureau of Indian Standards (BIS). The Ministry of Power (MoP) has issued guidelines in January 2025. **Key Points / Main Content** * **EV Battery Standards & Safety:** * MoRTH has amended AIS-156 and AIS-038 (Rev. 2) standards for L, M, and N category electric vehicles, applicable since December 2022. These standards prescribe technical requirements for traction batteries. * BIS has published safety standards and test protocols for lithium-ion batteries, including: * IS 18237: 2023: Safety of Primary and Secondary Lithium Cells and Batteries during Transport. * IS 16893 (Part 2):2018: Secondary lithium - Ion cells for the propulsion of electric road vehicles: Part 2 reliability and abuse testing. * IS 16893 2018 (Part 3): Secondary Lithium - Ion Cells for the Propulsion of Electric Road Vehicles Part 3 Safety Requirements. * IS 16805: 2018: Secondary Cells and Batteries Containing Alkaline or Other Non-Acid Electrolytes – Safety Requirements for Secondary Lithium Cells and Batteries, for use in Industrial Applications. * IS 16046 (Part 2):2018: Secondary Cells and Batteries containing Alkaline or other Non-Acid Electrolytes – Safety Requirements for portable sealed secondary cells and for batteries made from them for use in portable applications Part 2 Lithium systems. * **R&D Initiatives:** * The Ministry of Electronics and Information Technology (MeitY), under the Development of Electric Vehicle Sub-Systems (EVSS) program, is undertaking R&D for indigenous EV sub-systems, including motor/controller/converters/chargers/Battery Management System (BMS). R&D projects for BMS and AC/DC chargers have been initiated. * **Charging Infrastructure Development:** * Rs. 912.50 crore was sanctioned under FAME-II for setting up EV public charging stations (EVPCS). * Rs. 2,000 crore is allocated under the PM E-DRIVE Scheme for EV charging infrastructure deployment. * The Ministry of Power (MoP) has issued guidelines in January, 2025 to accelerate a connected and interoperable EV charging ecosystem. * 29,151 EV charging stations installed in India, with 12,033 being fast chargers. * **Advanced Chemistry Cell (ACC) Manufacturing:** * Rs. 18,100 crore has been allocated under the PLI ACC scheme to boost domestic manufacturing of ACCs, aiming to establish 50 GWh capacity over 7 years. **Impact Analysis** **EV Manufacturers (L, M, N categories)** * **Impact:** Must adhere to the amended AIS-156 and AIS-038 (Rev. 2) standards for traction batteries, ensuring compliance with technical requirements. * **Action Required:** Implement necessary design and testing changes to meet the updated standards. **Battery Manufacturers** * **Impact:** Must comply with the BIS safety standards and test protocols for lithium-ion batteries, impacting manufacturing processes and quality control. * **Action Required:** Align production with the specified standards (IS 18237, IS 16893, IS 16805, IS 16046), incorporating safety requirements and test protocols. **Charging Station Operators/Providers** * **Impact:** Beneficiaries of the FAME-II scheme funding and PM E-DRIVE scheme, involved in setting up EV public charging stations. Expected to align with MoP guidelines. * **Action Required:** Leverage available funding for infrastructure development and ensure alignment with the Ministry of Power guidelines issued in January, 2025. **Consumers/EV Users** * **Impact:** Access to safer and standardized EV batteries and increased availability of public charging infrastructure. * **Action Required:** Stay informed about the growing network of charging stations and the safety standards applicable to their vehicles' batteries.

Key Entities Referenced

Ministry of Road Transport and Highways (MoRTH): Responsible for notifying and updating EV battery standards. Bureau of Indian Standards (BIS): Publishes safety standards for lithium-ion batteries. FAME-II Scheme: Scheme for setting up EV public charging stations (EVPCS). PM E-DRIVE Scheme: Scheme for deployment of EV charging infrastructure on pan India basis. PLI ACC scheme: A scheme of the Ministry of Heavy Industries to boost domestic manufacturing of Advanced Chemistry Cells.
Official Source Record View Original Source →
See Full Document Text
Ministry of Heavy Industries EXPANSION OF EV CHARGING INFRASTRUCTURE प्रव तथ: 12 DEC 2025 4:07PM by PIB Delhi The Ministry of Road Transport and Highways (MoRTH) notifies EV battery standards and periodically updates these standards, which are available on its website. MoRTH has amended AIS-156 for L-category electric vehicles and AIS-038 (Rev. 2) for M and N-category electric vehicles to prescribe technical requirements for traction batteries. These standards have been applicable since December, 2022. EV prototypes and components are tested for over-charge / discharge protection, over-current / short-circuit protection, over-temperature protection, voltage cut-off and Battery Management System. Bureau of Indian Standards (BIS) has published the safety standards, prescribing safety requirements and test protocols for lithium-ion batteries as follows: 1. IS 18237: 2023: Safety of Primary and Secondary Lithium Cells and Batteries during Transport. 2. IS 16893 (Part 2):2018: Secondary lithium - Ion cells for the propulsion of electric road vehicles: Part 2 reliability and abuse testing. 3. IS 16893 2018 (Part 3): Secondary Lithium - Ion Cells for the Propulsion of Electric Road Vehicles Part 3 Safety Requirements. 4. IS 16805: 2018: Secondary Cells and Batteries Containing Alkaline or Other Non-Acid Electrolytes – Safety Requirements for Secondary Lithium Cells and Batteries, for use in Industrial Applications. 5. IS 16046 (Part 2):2018: Secondary Cells and Batteries containing Alkaline or other Non-Acid Electrolytes – Safety Requirements for portable sealed secondary cells and for batteries made from them for use in portable applications Part 2 Lithium systems. Further, as per inputs received from Ministry of Electronics and Information Technology (MeitY), the Ministry under the Development of Electric Vehicle Sub-Systems (EVSS) programme, has undertaken R&D initiatives for the indigenous development of Electric Vehicle Sub-system like motor/controller/converters/chargers/ Battery Management System (BMS) targeting different segment of Electric Vehicles. Under the programme, R&D project for development of Battery Management System (BMS) and AC/DC Chargers for EV have also been taken up. Under FAME-II Scheme, an amount of Rs.912.50 crore was sanctioned for setting up of EV public charging stations (EVPCS). Further, there is an allocation of Rs.2,000 crore under the PM E-DRIVE Scheme for deployment of EV charging infrastructure on pan India basis. The Ministry of Power (MoP) has issued guidelines in January, 2025 to accelerate a connected and interoperable EV charging ecosystem. As per inputs received from BHEL, total number of EV charging stations installed in the country are 29,151 out of which no. of fast chargers installed are 12,033.Under the PLI ACC scheme of Ministry of Heavy Industries, Rs.18,100 crore has been allocated to boost domestic manufacturing of Advanced Chemistry Cells. It aims to establish 50 GWh of ACC manufacturing capacity in India over a period of 7 years. This information was given by the Minister of State for Heavy Industries, Shri Bhupathiraju Srinivasa Varma in a written reply in the Rajya Sabha today. ***** TPJ/NJ (रलीज़ आईडी: 2202970) आगंतुक पटल : 733 इस वज्ञ को इन भाषाओ ंम पढ़: Urdu , ही

Continue your research