Date: 2025-12-02Category: Not ApplicableState: Union GovernmentCountry: India
Four laning of Madurai – Tuticorin section of NH-38 – Proposal of laying underground water pipeline along the road from Km 156/180 to Km 156/250 (BHS) and across the road @ Km 156/250 – Invitation of Public Comments – Reg.
**Executive Summary**
This document concerns a proposal by the Executive Engineer, TWAD Board, Project Division, Virudhunagar for laying an underground water pipeline along and across the Madurai-Tuticorin section of NH-38. The proposal involves laying a pipeline from Km 156/180 to Km 156/250(BHS) and across the road at Km 156/250. This document serves as an invitation for public comments on the proposed project, with a deadline of 30 days from uploading.
**Key Points / Main Content**
* **Project Details:**
* The proposal concerns laying an underground water pipeline along the road from Km 156/180 to Km 156/250(BHS) and across the road @ Km 156/250 in the Madurai - Tuticorin section of NH-38.
* The project is submitted by the Executive Engineer, TWAD Board, Project Division, Virudhunagar.
* The proposal aligns with Ministry guidelines dated 22.11.2016.
* The applicant will shift the laid water pipeline in the future within 90 days if required by NHAI.
* **Pipeline Alignment Specifics:**
* Along NH-38 (Km 156/180 to Km 156/250(BHS)):
* Length: 140 m
* Diameter: 0.225 m
* Available ROW: RHS & LHS 30m each
* Erection Distance: 29.5 m from center on both sides
* Remark: Laying of pipeline along the extreme edge of ROW at a distance of 0.5m from the ROW edge
* Across NH-38 (Km 156/250):
* Length: 60 m
* Diameter: 0.5 m
* Available ROW: RHS 60m
* Remark: Laying of pipeline across by HDD method at a minimum depth of 3.0 m from the top of the ground level
* **Financial Obligations:**
* Restoration charges for laying the pipeline are Rs. 1,14,000/-, secured by a Bank Guarantee valid for one year.
* Track rent for laying the pipeline is Rs. 56,371/- for five years, to be remitted in Bharatkosh Portal.
* **Applicant Responsibilities:**
* Ensure the safety of highway traffic during construction.
* Follow instructions given by NHAI officials.
* Obtain prior approval for any shifting, repairs, or alterations of utility lines.
* Bear the cost of repairing any damage caused to the National Highways.
* Restore the site to its original condition, if required by the Government of India or any authorized person.
* Keep the road traffic-worthy during construction.
* Avoid dismantling cross-roads
* Get clearance from Statutory Departments (Forest Department, Water Resource Department etc.)
* Ensure no damage is caused to NH assets.
**Impact Analysis**
**Stakeholder: Executive Engineer, TWAD Board, Project Division, Virudhunagar (Applicant)**
* **Impact:** Gaining permission to lay the water pipeline along and across NH-38, subject to adherence to various guidelines and financial obligations.
* **Action Required:**
* Provide Bank Guarantee of Rs. 1,14,000/- and remit track rent of Rs. 56,371/-.
* Adhere to all guidelines and conditions outlined in the document during the laying and maintenance of the pipeline.
* Shift pipeline in future within 90 days if required by NHAI for expansion of the NH at their own cost without claiming any compensation from NHAI
* Obtain all necessary approvals.
**Stakeholder: General Public**
* **Impact:** Potential disruption during construction and long-term access to reliable water supply if the project is completed successfully.
* **Action Required:** Submit any comments or concerns regarding the proposed project to the Regional Officer, National Highways Authority of India, No.2nd & 3rd Floor, Vijay Krishna Plaza, No.1, Lake Area, Melur Main Road, Mattuthavani, Madurai 625 007 within 30 days of the document date (01-12-2025).
Key Entities Referenced
National Highways Authority of India (NHAI): The primary regulatory and implementing authority for the project, responsible for approving the laying of the water pipeline and ensuring compliance with its guidelines.
TWAD Board: Tamil Nadu Water Supply and Drainage Board, the applicant seeking permission to lay the water pipeline and responsible for its construction and maintenance.
NH-38: The National Highway on which the water pipeline is to be laid, crucial for defining the geographic scope and potential impact of the project.
Madurai-Tuticorin section: The specific section of NH-38 where the pipeline laying activity will take place, influencing the project's localized impact.
Virudhunagar: The district of Tamil Nadu, and location of the Project Division of TWAD board involved in the project.