Home India ENERGY DEPT Gazette No 165: Power Plants ( Regulation No. 3 of 201...
Date: 2017-06-06 Category: AP E-Gazette - Extraordinary / PART I State: Andhra Pradesh Country: India

Gazette No 165: Power Plants ( Regulation No. 3 of 2017) . ction: Lr.No.APERC / Secy / F.No.S-19 /17, Dated : 05-06-2017

Issued by ENERGY DEPT · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task
Official Source Record View Original Source →
See Full Document Text
Registered No. HSE-49/2016 PART I EXTRAORDINARY No.271 AMARAVATI, TUESDAY , JUNE 6, 2017 G.165 NOTIFICATIONS BY GOVERNMENT --x-- ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION Power Evacuation from Captive Generation, Cogeneration and Renewable Energy Source Power Plants (Regulation No. 3 of 2017). Lr.No.APERC / Secy / F.No.S-19 /17, Dated : 05-06-2017 1.Introduction: Transmission Corporation of Andhra Pradesh Limited (APTRANSCO), Eastern Power Distribution Company of Andhra Pradesh Limited (APEPDCL) and Southern Power Distribution Company of Andhra Pradesh Limited (APSPDCL) made a proposal, seeking power evacuation guidelines covering different types of Power generation plants like Solar, Wind, Small hydro, Bio-mass and Municipal Solid Waste: The Commission considered the proposals submitted by the DISCOMs and APTRANSCO and having identified the need for issuing a comprehensive regulation on Power evacuation, a draft regulation was prepared and the draft Regulation was hosted in the Commission’s web site for seeking comments/suggestions from interested persons and all stakeholders. Considering all the comments/suggestions, the Commission makes the following Regulation : 2. In exercise of the powers conferred by Section 30, Section 86 (1) (e) and read with sub-section (1) of Section 181 and clause (zp) of sub-section (2) of Section 181 of the Electricity Act, 2003 (36 of 2003) and clause 5.2.26 of National Electricity Policy and clause 5.12 of National Tariff Policy and all other powers enabling it in that behalf, the Andhra Pradesh Electricity Regulatory Commission hereby makes the following Regulations, namely : [1]2 ANDHRA PRADESH GAZETTE EXTRAORDINARY [Part-I 3. Short Title, commencement and extent : a) This Regulation shall be called the “Andhra Pradesh Electricity Regulatory Commission (APERC) Regulation on Power Evacuation from Captive Generation, Cogeneration and Renewable Energy Source Power Plants (Regulation No. 3 of 2017)”. b) This Regulation shall come into force with effect from the date of its publication in the Andhra Pradesh Gazette. c) This Regulation shall apply to Distribution Licensees, Transmission Licensees, captive generating plants, cogeneration power plants and all Renewable Energy source power plants. d) In case of any inconsistency between the provisions of this Regulation and any other Regulation, order or Practice Directions of the Commission, the provisions of this Regulation will prevail. 4. Definitions : (1) “Act” means the Electricity Act, 2003 (36 of 2003) ; (2) “Authority” means the Central Electricity Authority referred to in sub-section(1) of Section 70 ; (3) APTRANSCO means, a transmission company having transmission licence granted under Section 14 of the Act, authorized to undertake transmission activity in the State. (4) “Captive generating plant” means a power plant as defined U/s 2 (8) and shall comply with qualifications prescribed under Rule 3 of the Electricity Rules notified by Central Government U/s 3 of Act as amended from time to time. (5) “CERC” means the Central Electricity Regulatory Commission established under Section 76 of the Act ; (6) “Cogeneration” means a process which simultaneously produces two or more forms of useful energy (including electricity) ; (7) APERC or “Commission” means the Andhra Pradesh Electricity Regulatory Commission ; (8) “Conservation” means any reduction in consumption of electricity as a result of increase in the efficiency in supply and use of electricity ; (9) “Dedicated feeder (line)1' means any electric supply-line for point to point transmission which are required for the purpose of connecting electric plants of a Captive Generation Plant, Cogeneration Plant or Renewable Energy Source Power Plant like Solar, Wind, Small Hydro, Bio-mass and Municipal Solid Waste (MSW) to APTRANSCO/DISCOM sub-stations.June 6, 2017] ANDHRA PRADESH GAZETTE EXTRAORDINARY 3 (10) “Distribution Licensee” or “DISCOM” means a licensee authorised to operate and maintain a distribution system for supplying electricity to the consumers in his area of supply; (11) “Grid” means transmission network or distribution network of APTRANSCO/ DISCOM. (12) “Licence” means a licence granted under Section 14 of the Act, 2003 ; (13) “SLDC” or “State Load Dispatch Centre” means the centre established under Section 31 of the Act ; (14) “State” means the State of Andhra Pradesh. (15) “State Grid Code” means the grid code specified by the Commission. (16) “Power evacuation” means a facility that allows generated power to be immediately transmitted from a generating plant to the grid for further transmission/ distribution to load centers. (17) “Reform Act” means the Andhra Pradesh Electricity Reform Act, 1998. (18) “Regulations” means the regulations made by the Commission under the provisions of the Act; (19) “Renewable Energy Sources” (hereinafter called ‘RE Sources’) means renewable energy sources such as small hydro, wind, solar, biomass, bio fuel co-generation (including bagasse based co-generation), municipal solid waste and such other sources as recognized or approved by the MNRE or State Government ; (20) “Year” means a period of twelve months from 1st April of a calendar year to 31st March of the following calendar year. (21) Words and expressions used in this Regulation and not defined herein but defined in the Electricity Act, 2003, shall have the meaning as assigned to them under the Act. 5. General Terms and Conditions (1) The Generating Plant shall establish, operate and maintain Generating Station, sub-station, tie lines and dedicated transmission lines connected thereto in accordance with : (a) the technical standards for construction of electrical plants, electric lines and connectivity with the grid as specified by the Authority ; (b) safety requirements for construction, operation and maintenance of electrical plants and electric lines as specified by the Authority; (c) Andhra Pradesh Electricity Grid Code or Indian Electricity Grid Code (IEGC) ; 6. Power Evacuation: (1) Independent projects at a particular location shall normally be connected to the nearest grid substation (SS) of APTRANSCO /DISCOM, as the case may be.4 ANDHRA PRADESH GAZETTE EXTRAORDINARY [Part-I (2) The Solar and Wind power projects developed in cluster will be connected from the pooling bus/substation of the Solar/Wind farm by erection of 11 kV line or 33 kV line or EHT line for connecting to the existing nearest grid substation of APTRANSCO /DISCOM, as the case may be. 7. Criteria for determining the power carrying capacity of conductors: The calculations are based on Continuous current (Thermal loading) limit at 45°C ambient temperature and Maximum Conductor Temperature (MCT) at 75°C for ACSR and 85°C AAAC as per IS 802 (Part1-Sec-1) -1995. The types of conductors mentioned hereunder are illustrative only and not exhaustive. APTRANSCO/DISCOMs/Project Developers are free to use any equivalent conductor such as All Aluminum Conductors (AAC) or AL 59 or any other conductors that may come in future with technological advancement, depending upon the power to be evacuated. While evacuating power from these power plants, the Power Developers/APTRANSCO/DISCOMs shall select conductors of proper size based on the power capacity to be evacuated. 8. Power Evacuation capacities using different types of conductors for 11 kV, 33 kV and EHT voltages : (1) Power evacuation at 11 kV level to the existing 33/11 kV SS shall be limited to 3 MW only and power evacuation at 33 kV level to the existing 33/11 kV SS shall be limited to 10 MW only, due to limitation of substation capacity. (2) Power evacuation at 33 kV level to the EHT SS shall be limited to 40 MW subject to availability of transformation capacity. Power evacuation may be in one or more circuits depending upon availability of bays in that substation and loading per circuit can go upto 25 MW in case of wind power plants and whereas in case of other than wind power plants, loading per circuit shall not exceed 20 MW per circuit. (3) If required, the DISCOMs/APTRANSCO shall do augmentation of power transformer capacity or bus bar capacity or erection of new bays within three months for 33 kV and six months for EHT and provide connectivity to the prospective power developers for power evacuation.June 6, 2017] ANDHRA PRADESH GAZETTE EXTRAORDINARY 5 (4) To arrive at transmission line capacity, thermal loading limit at 2 km/hr wind speed is considered for other than wind power projects. (5) As mentioned in Central Electricity Authority (CEA) “Manual on Transmission Planning Criteria, January 2013”, Solar/Wind power being intermittent power, for evacuation of power from Solar/Wind power projects, ‘N-l’ criteria is not applied for the immediate connectivity of solar/wind farms with the intra state grid i.e., the line connecting the farm to the grid and the step-up of transformers at the grid substation. (6) As mentioned in CEA “Manual on Transmission Planning Criteria, January 2013”, the wind and solar farms shall maintain a power factor of 0.98 (absorbing) at their grid inter-connection point for all dispatch scenarios by providing adequate reactive compensation.6 ANDHRA PRADESH GAZETTE EXTRAORDINARY [Part-IJune 6, 2017] ANDHRA PRADESH GAZETTE EXTRAORDINARY 78 ANDHRA PRADESH GAZETTE EXTRAORDINARY [Part-IJune 6, 2017] ANDHRA PRADESH GAZETTE EXTRAORDINARY 910 ANDHRA PRADESH GAZETTE EXTRAORDINARY [Part-IJune 6, 2017] ANDHRA PRADESH GAZETTE EXTRAORDINARY 1112 ANDHRA PRADESH GAZETTE EXTRAORDINARY [Part-IJune 6, 2017] ANDHRA PRADESH GAZETTE EXTRAORDINARY 1314 ANDHRA PRADESH GAZETTE EXTRAORDINARY [Part-IJune 6, 2017] ANDHRA PRADESH GAZETTE EXTRAORDINARY 1516 ANDHRA PRADESH GAZETTE EXTRAORDINARY [Part-IJune 6, 2017] ANDHRA PRADESH GAZETTE EXTRAORDINARY 17 ---x---

Continue your research