Home India ENERGY DEPT Gazette No 222: Energy Department - Proposal for setting up ...
Date: 2022-09-12 Category: AP E-Gazette - Extraordinary / PART I State: Andhra Pradesh Country: India

Gazette No 222: Energy Department - Proposal for setting up 2,200 MW pumped Hydro Storage Power Projects, 3,500 MW Solar Power and 1,500 MW Wind Power Projects by M/s. Indosol Solar Private Limited - Allotment of Captive Power Plants of 2,2OO MW Pumped Hydro Storage Power Projects, 3,500 MW Solar Power and 1,500 MW Wind Power Projects in Nandyal, Kurnool and YSR Districts for energy, requirement to the proposed Integrated Solar PV Manufacturing Unit at Nellore District- Orders - Issued.

Issued by ENERGY DEPT · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task
Official Source Record View Original Source →
See Full Document Text
Registered No. HSE-49/2016 PART I EXTRAORDINARY No.564 AMARAVATI, TUESDAY, MAY 23, 2023 G.222 NOTIFICATIONS BY GOVERNMENT --x--GOVERNMENT OF ANDHRA PRADESH ABSTRACT Energy Department - Proposal for setting up 2,2OO MW Fumped Hydro Storage Power Projects, 3,500 MW Solar Power and 1,500 MW Wind Power Projects by M/s. Indosol Solar Private Limited - Allotment of Captive Power Plants of 2,2OO MW Pumped Hydro Storage Power Projects, 3,500 MW Solar Power and 1,500 MW Wind Power Projects in Nandyal, Kurnool and YSR Districts for energ, requirement to the proposed Integrated Solar PV Manulacturing Unit at Nellore District- Orders - Issued. ENERGY (POWER.II) DEPARTMENT G.O.Ms.No. 19 Dated:-L2.O9.2022 Read the following: - 1.G.O.Ms.No.1, Enerry (Power.ll) Dept, dt:3, l-2019. 2.G. O. Ms, No. 2, Energr(Power. II) Dept-, dated:3- 1 -20 1 9. 3.G. O.M s. No.3, Energr (Power.ll) Dept, dated:3 - 7 -2O 19. 4.G.O.Ms.No.35, Energr (Power.ll) Dept, dated: 18-1 1-2019 and G.O.Ms.No. 1, dated: l -3-2021. S.Proposals received on 23.08.2022 ol M/s Indosol Solar Private Limited, Hyderabad. 6.Govt Letter No. ENEO 1 -APRE I I 3 I 2022, dated:23 -O8-2O22. 7.From the Vice Chairman & Managing Director, New and Renewable Energr Development Corporation of Andhra Pradesh (NREDCAP), letter No. NREDCAP/WE/PSP/lndosoll 2022 dated 25.08.2O22 and 29.08.2022. 8.From the Chairman & Managing Director, APIRANSCO, vide letter No.CMD / CGM / Commercial & Legal / RAC / F -O5 I 2022, dt:27.O8.2022. 9.From the Member-Convenor, APPCC, Vijayawada, letter No.CGM/ PP/ DGM / REP Projects/ D. No. I 22, dated:27 -O8-2O22. ORDER:- Government of Andhra Pradesh is giving prioriry for promotion of Renewable Energr Power projects and has been rolling out multiple initiatives, programs, policies and incentives to accelerate the development of the renewable energr sector. The State is having good RE power potential particularly in Rayalaseema rcgion huge extents of lands have been ',l,here identified for promotion of RE power projects by inviting private investments. 2. Further, the GoVernment of India has committed at the 26th session of the Conference of the Parties (COP26) to the United Nations Framework Convention on Climate Change (UNFCCC) held in Glasgow, United Kingdom to reach 500 GW Non-fossil ener$T capacity by 2030 and achieve the target of net zero emissions by 2O7O. (P.r.o.)2 3. ln the G.O lst to 4th read above Government have issued orders providing incentives for large scale promotion of Wind Power, Solar Power and Wind-Solar hybrid Power Projects in the State of Andhra Pradesh. 4. In order to balance the variations in RE generation, reliable Energr Storage solutions are required. Though various ener$/ storage technologies are available, Pumped Hydro Storage Power Projects (PSP) offer highest promise due to their flexible operation to balance the Variable Renewable generation in short span of time. Andhra Pradesh is in forefront in the country in identifying potential sites lor promotion of Pumped Storage Hydro Power Projects. Techno-Commercial Feasibility Reports (TCFR) were prepared with an aggregate potential of 33,240 MW. Detailed Project Reports are under preparation lor most viable locations in phased manner. Considering the huge capital investments required to establish PSP Projects, the Government is intending to encourage private investments in already identical PSP projects. 5. M/s. ISPL is setting up fully integrated Solar PV manufacturing industry from Poly-silica to Ingot-wafer to Cell to Module which is being set up in the State. M/ s ISPL won the Production Linked Incentive Scheme announced by Govt. of India to promote domestic manufacturing and reduce imports of Solar Panels which also aligns with the Aatma Nirbhar Bharat Initiative of Govt. of India. 6. In the reference Sth read above, M/s Indosol Solar Pvt. Ltd. (ISPL), Hyderabad, have submitted the proposal to the Government to allocate the Captive Power Plants to meet their Power Requirements for the Green Field Vertically Integrated Solar Photovoltaic Manufacturing Unit for allocation of 1.50 GW Wind Power, 3.5 GW Solar Power and 2.2 GW Pumped storage power Projects:- Captive Plants Capacity Location Wind Plant 1.5 GW Dhone West, Gunduthanda ebbatam H Solar Plant 3.5 GW Kolimigundla (V), Kurnool District :1200 MW, Urinchintala, Ananthapur District: 600 MW, M. Kambaladinna (V): 600 MW, Thondur (V) : 400 MW, Kadapa District,Kambadur, Ananthapur District: 700 MW Pumped Storage 2CW Paidipalcm North & East Plant (Contd..P.3)::3:: 7 . The estimated capitai expenditure for proposed solar PV module manufacturing unit is indicated as Rs. 20,836 Crores in the 1st phase with a potential to create employment for more than 5,000 people in AP State. The project is expected to create huge employment opportunities to about 1 1 ,500 people directly and 10,000 - t I ,000 people indirectly in a phased manner (3 phases) over a period of 5 years. The manufacturing facility being set up by M/s. ISPL is highly energr intensive and requested the Government for allocation ol PSP, Solar and Wind Power Projects to meet the captive power requirements thereby reducing the cost of power for their manufacturing facilify will bring down the cost of manufacturing of solar cell and they can compete with International Market. In the case of Captive Power Plants an amount of Rs.25,000 crores of revenue to the Government and 1 1,000 persons will get direct and indirect employments u.ith the proposed project. 8. The proposal of M/s. Indosol Solar Pvt. Ltd. has been placed before State Investment Promotion Board (SIPB) meeting held on 05.O9.2022. The SIPB has taken the following decisions: i. Allotment of Pumped Storage Hydro Power (PSP) Projects and Solar Power and Wind Power Projects as follows: a. Paidipalem East Pumped Storage Power Project in YSR Dist.- 1200 MW b.Paidipalem North Pumped Storage Power Project in YSR Dist.- 1000 Mw c.Solar Power in Kolimigundla mandal, Kurnool District - 3500 MW d.Wind Power in Dhone West and Hebattam of Holagunda mandal, Kurnool District -1500 MW ll Extend Mega Industrial Project Status to the project to facilitate single windou, clearances. NREDCAP will be the Nodal Agency. However, no incentives will be provided. lll Allotment and alienation of revenue land available if any at the PSP project locations on outright salc basis (.r_l Rs. 5.O0 lakhs per acre or on lease basis with lease rentals of Rs.31,000/acre with an annual escalation of 57o for every two years, based on the option ol the Projcct developer at Simhadripuram Mandal, YSR District. IV. Allotment of project areas and allocation of revenue lands available if any in the proposed project locations for Solar and Wind power projects on lease basis with lease rentals of Rs.31,000/acre with an escalation of 5% for every two years without overlapping with the capacities of other developers as per (P,T,O)1 the provisions of AP Solar Power Policy 2018 and AP Wind Power Policy 20 18 read with AP RE Export policy 2020. The land allocation shall not exceed 3 acres per MW in case of Solar power projects and 2.50 acres power projects at Kolimigundla (Mandal) Nandyal District / M. Kambaladinne (V) and Kadarabad of Mandal, YSR District for Solar Projects and Dhone West, Dhone (Mandal) for Wind Projects. Allocation of 3.0 TMC of water on one-time non-consumptive basis and O.45 TMC water towards annual evaporation losses from the existing Paidipalem Reservoir as per the Industrial Water Supply Policy / Guidelines and subject to guidelines issued by the Water Resources Department. vl. Green Energr Development Charge shall be levied for the component of Pumped Storage Power Project @ - Rs 1 lakh/ MW of installed capacity/year for first 25 years from the date of commissioning of the project and of Rs 2 Lakhs/ MW instalied @) capacity/year thereafter. v11. Govt. of Andhra Pradesh will support and facilitate the project for availing grants of special category projects under central Govt. schemes. vlll Govt. of Andhra Pradesh will facilitate the project for availing benefits provided as per National Energr Storage Policy without any financial commitment from Govt. of Andhra Pradesh. tx Payment of Rs. 50,0O0 per MW to rhe Nodal Agency (NREDCAP) for PSP capacities towards registration charges within two months from the date ol allocation of the projects by the Government. x Payment of Statutory fee and charges to NREDCAp for Wind and Solar Power capacities within two months from the date of allocation of the projects by the Government. xl Reimbursement of actual expenditure incurred by the NREDCAp by the developer, towards preparation of Feasibility Reports, Detailed Project Report, carrying out various field investigations and expenditur e towards obtaining various clearances of the said PSP projects as and when demand notice is raised by NREDCAP. xll. The project completion timelines in case of pSp projects is 6 Years and in case of Wind and Solar Power project is 2 years from the date of handing over of revenue lands available if any at the proposed project locations. (Contd.P.5)c 9. Government after detailed examination of the proposal of M/s. Indosol Solar Pvt. Ltd., in consultation with various stakeholders i.e, Revenue Dept., EFS&T Dept./ WRD Department. APIRANSCO in the light of the decisions taken in the State Investment Promotion Board, havc decided to extend the incentives as per the decisions of State Investment promotion Board as per the incentives given to the Adani Green Energr Limited/Greenko Energies Private Limited in the case of Pumped Storage projects and policies of Solar, Wind and Hybrid Policies of 2018 issued by the Govt in the G.Os lst to 4th read above. 10. Accordingly, the Government here by issue the lollowing orders:- l. 2200 MW of Pumped Storage Hydro Power (PSP) Projects, 3SO0 MW of Solar Power and 1500 MW of Wind Power Projects are allotted to M/s. Indosol Solar Pvt. Ltd. at the fotlowing locations: Sl.No. Project Project Location Capacity Com nent 1 Pumped Storagc Paidipalem East, 1200 MW Hydro Project Simhadripuram Mandal, YSR Dist. 2 Pumped Storage Paidipalem North, 1000 Mw Hydro Project Simhadripuram Mandal YSR Dist. 3 Solar Power Kolimigundla mandal, 3.500 MW Kurnool Dist., M Kambaladinne & Kaderabad villages of Mylavaram Mandal, YSR Dist. 4 Wind Power Dhone West and 1500 MW Hebattam, Holagunda mandal, Nandyal/ Kurnool Districts. Total 7,2OO MW II Mega Industrial Project Status has been accorded to the project to facilitate single window clearances. NREDCAP will be the Nodal Agency. However, no incentives will be provided. ll1. Allotment on lease basis/ alienation of revenue land available if any at the PSP project locations either on outright sale basis Rs. @ 5.O0 lakhs per acre or on lease basis with lease rentals of Rs.31,OOO/acre with an escalation of 57o for every two years, based on the option of the Project developer at Simhadripuram Mandal, YSR District. (P.r.o.)6 Allotment of project areas and allocation of revenue lands available lV. if any in the proposed project locations for Solar and Wind power projects on lease basis with lease rentals of Rs.31,000/acre with an es..lrtio., of 57o for every two years without overlapping with the capacities of other developers as per the provisions of AP Solar Power Policy 2018 and AP Wind Power Policy 2018 read with AP RE Export Policy 2O20. The land allocation sha11 not exceed @ 3 acres p.i Uw in case of Solar Power projects in Kolimingundla Mandal, kurnool District and M.Kambaladinne and Kaderabad villages of Mylavaram Mandal, YSR District for Solar Projects and @2.50 acres per MW at Dhone West, Dhone Mandal and Hebbattam village, Holagunda Mandal , Kurnool District in case ol Wind Projects. Aliocation ol 3.0 TMC of water on one-time non-consumptive basis and 0.45 TMC water towards annual evaporation losses from the existing Paidipalem Reservoir as per the Industrial Water Supply Policy / Guidelines and subject to guidelines issued by the Water Resources Department. vl. Green Energr Development Charge sha11 be levied for the component of Pumped Storage Power Project only @ - Rs1 lakh/ MW of installed capacity/year for first 25 years from the date of commissioning of the project and Rs 2 Laklns I MW installed capacity/year thereafl er. Govt. of Andhra Pradesh will support and facilitate the project for v11 availing grants of special category projects under Central Govt' schemes. Govt. of Andhra Pradesh will facilitate the project for availing v111. benefits provided as per National Energ}r Storage Policy without any financial commitment from Govt. of Andhra Pradesh. Registration Charges of Rs. 50,0O0 per MW sha1l be paid to the 1X NREDCAP for PSP capacities within two months from the date of this order. x. Statutory fee and charges to NREDCAP shall be paid for Wind and Solar Power capacities within two months from the date of this order. Actual expenditure incurred by the NREDCAP towards preparation x1 of Feasibility Reports, Detailed Project Report, carrying out various field investigations and expenditure towards obtaining various clearances of the said PSP projects shall be reimbursed / paid by M/s. Indosol Solar Pvt. Ltd. as and when demand notice is raised by NREDCAP. (Contd..P.7)7 xll. The aliocated projects shall be executed and commissioned within a period of 6 (Six) years from the date of handing over of revenue Iands available if any at the proposed project locations, failing which the entirc land shall be resumed back to the Government. x l. The Porest Department shall extend necessary support and facilitate to carry out surveys and investigations in forest areas and diversion of forest lands. 1 1. The Revenue Department/ EFS & T/ Industries & Commerce/ Water Resources Department/ AffRANSCO shall take necessary action accordingly with respect to their issues mentioned at para 10 above. 12. The Vice Chairman & Managing Director, New and Renewable Energr Development Corporation of Andhra Pradesh Ltd.,, Tadepalli shall take further necessary action accordingly. (BY ORDBR AND IN THI1] NAME OF THE GOVERNOR OF ANDHRA PRADESH) K. VIJAYANAND SPECIAL CHIEF SECRETARY TO GOVERNMENT To M/s Indosol Solar Pvt. Ltd., 6-3-879l8, 3rd Floor, G Pulla Reddy Sweets Buildings, Begumpet, Hyderabad-SOO 0 16. The Vice Chairman & Managing Director, NREDCAP, Tadepalli. The Chairman & Managing Director, APIRANSCO, Vidyuth Soudha, Vijayawada. The Chiel Commissioner of Land Administration & Special Chief Secretary to Government, APIIC Towers, Mangalagiri. The Special Chief Secretary to Governmenr, Revcnuc Department. The Special Chief Secretary to Government, Finance Department. The Special Chief Secretary to Govt., Industries & Commerce Department. The Special Chief Secretary to Government, EFS&T Department. The Principal Secretary to Government, Water Resources Department. The Principal Chief Conservator of Forests, GoAP, Guntur. The Collector & District Magistrate, Kurnool District. The Collector & District Magistrate, Nandyal District. The Collector & District Magistrate, YSR District. Copv to: The Commissioner of Industries, Vijayawada. The Managing Director, APGENCO, Vidyuth Soudha, Vijayawada. The Chairman & Managing Director, APSPDCL, Tirupati. The Chairman & Managing Director, APCPDCL, Vijaya'*'ada. The Chairman & Managing Director, APEPDCL, Visakhapatnam. (P.r.o.)B The P.S to Special Chief Secretary to Chief Minister' The P.S. to Secretary to Chief Ministcr. The P.S. to Minister for Energr, FES & T and Mines & Geolory' The P.S., to Special Chief Secretary to Government, Energr Dept Sf/ Scs. / / FORWARDED: :BY ORDER/ / K tlo.,-. SECTION OFFICER

Continue your research