See Full Document Text
Registered No. HSE-49/2016
PART I EXTRAORDINARY
No.576 AMARAVATI, TUESDAY, MAY 23, 2023 G.234
NOTIFICATIONS BY GOVERNMENT
--x--File No.ENE01-APRE/8/2022-MLO-ENE-Part(1)
GO MS/4/2023/ENE01-Energy
GOVERNMENT OF ANDHRA PRADESH
ABSTRACT
Energy Department – Proposal for setting up of 2100 MW of Pumped Storage
Hydro Power(PSP) Projects by M/s Shirdi Sai Electricals Ltd.-Allotment of 2100 MW
PSP Projects at Somasila in YSR District (900 MW) and Yerravaram in Alluri
Seetharama Raju District (1200 MW) – Orders – Issued.
= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =
ENERGY (POWER.II) DEPARTMENT
G.O.Ms.No.02 Dated:19-01-2023
Read the following:-
1. Proposal No. SSE/ED-NREDCAP/PSP/03, dated. 13.06.2022 of M/s Shirdi
Sai Electrical Limited, Hyderabad.
2. Govt Letter No.ENE01-APRE/8/2022, dated:20-06-2022.
3. From the Vice Chairman & Managing Director, New and Renewable Energy
Development Corporation of Andhra Pradesh (NREDCAP), vide letter
No.NREDCAP/WE/PSP/SSE/2022, dated 20.06.2022.
4. From the Chairman & Managing Director, APTRANSCO, vide letter
No.CMD/CGM/Commercial/RAC/F.05/22, D.No.73/22, dt.20.06.2022.
5. From the Member-Convenor, APPCC, Vijayawada, letter No. MC/APPCC/
CGM(PP)/ DGM(IPPs)/ F.PSPs.D.No.136/22, dt.21-06-2022.
6. G.O.Ms.No.64, Water Resources (Reforms) Dept, dated:10-12-2021.
7. G.O.Ms.No.6, Water Resources (Reforms) Dept, dated:18-01-2023.
***
O R D E R:-
Renewable Energy has started playing an increasingly important role worldwide
in augmentation of grid power, providing energy access, reducing the consumption
of fossil fuels thereby mitigating the climate change challenges. Andhra Pradesh
being one of the leading states contributing to the RE capacity addition, has been
rolling out multiple initiatives, programs, policies and incentives to accelerate the
development of the renewable energy sector. However, in order to balance
the variations in RE generation, reliable Energy Storage solutions are required.
Though various energy storage technologies are available, Pumped Hydro Storage
Power Projects (PSP) offers highest promise due to their flexible operation to
balance the Variable Renewable generation in short span of time. Andhra Pradesh
is in forefront in the country in identifying potential sites for promotion of Pumped
Storage Hydro Power Projects. Techno-Commercial Feasibility Reports (TCFR)
are prepared with an aggregate potential of 33,240 MW. Detailed Project Reports
are under preparation for most viable locations in phased manner. Considering the
huge capital investments required to establish PSP Projects, the Government is
intending to encourage private investments in already identified PSP projects.
2. Further, the Government of India has committed at the 26th session of the
Conference of the Parties (COP26) to the United Nations Framework Convention on
Climate Change (UNFCCC) held in Glasgow, United Kingdom to reach 500 GW
Page 1 of 5File No.ENE01-APRE/8/2022-MLO-ENE-Part(1)
GO MS/4/2023/ENE01-Energy
Non-fossil energy capacity by 2030 and achieve the target of net zero emissions by
2070. In view of the commitments of Government of India, the share of Renewable
Energy is expected to be increased substantially in the country in the coming years
and is going to be more challenging than ever before to maintain stable grid due to
variations in Renewable Energy Power generation. The Govt.of India has identified
pumped storage hydro projects as one of the most prominent energy storage options
that can be considered for balancing of variable renewable energy and is extensively
promoting development of PSPs which is the most commonly used and
commercially viable large scale electricity storage technology and currently accounts
for 95% of the total storage capacity globally.
3. In the reference 1st read above, M/s.Shirdi Sai Electrical Ltd. (M/s SSEL),
Hyderabad, have submitted proposal to the Government for allocation of 2100 MW
Pumped Storage Hydro Power (PSP) projects at the following locations,
i. Somasila, YSR District : 900 MW
ii. Yerravaram, Alluri Seetarama Raju District : 1200 MW
4. M/s. Shirdi Sai Electrical Ltd. have requested to extend certain incentives and
issue project allotment order for development of 2100 MW PSPs and extend
necessary support required from relevant departments of GoAP for grant of various
approvals, clearances related to the above projects. Implementation of 2100 MW
PSP Projects will bring investments to an extent of Rs. 8,855 Crores and the projects
help to improve the local economy besides creating direct and indirect employment
to 2100 persons.
5. The proposal of M/s. Shirdi Sai Electrical Ltd. has been placed before State
Investment Promotion Board (SIPB) meeting held on 12.12.2022. The SIPB have
taken the following decisions:
i.Allotment of 2100 MW Pumped Storage Hydro Power (PSP) Projects near
Somasila, YSR District and Yerravaram in ASR District.
ii.Extend Mega Industrial Project Status to the project to facilitate single window
clearances. NREDCAP will be the Nodal Agency. However, no incentives
will be provided.
iii.Allotment and alienation of land required and available if any in the project
areas for the projects on outright sale basis @ Rs. 5 lakhs per acre per year
or on lease basis with lease rentals of Rs. 31,000/acre with an annual
escalation of 5% for every two years, based on the option of the project
developer.
iv.Allocation of 0.294 TMC of water on one-time non-consumptive basis and
0.015 TMC water towards annual evaporation losses from Somasila
Reservoir in case of Somasila PSP and 0.53 TMC water on one-time non-
consumptive basis and 0.046 TMC water towards annual evaporation losses
from natural streams in case of Yerravarm PSP. The charges as per the
prevailing guidelines of the Water Resources Department shall be paid.
v.Green Energy Development Charges shall be levied @ Rs. 1 lakh/MW/Year
for 1st 25 years and Rs. 2 lakhs/MW/year for remaining life of the project.
vi.Govt. of A.P. will support and facilitate the project for availing grants of
special category projects under Central Govt. schemes.
Page 2 of 5File No.ENE01-APRE/8/2022-MLO-ENE-Part(1)
GO MS/4/2023/ENE01-Energy
vii.Govt. of A.P. will facilitate the project for availing benefits provided as per
National Energy Storage Policy without any financial commitment from Govt.
of AP.
viii.The project shall be completed within 6 years the date of handing over of
revenue lands available if any at the proposed project locations.
6. Government after detailed examination of the proposal of M/s Shirdi Sai
Electrical Ltd., in consultation with various stakeholders i.e, Revenue Dept., EFS&T
Dept., Water Resources Department, APTRANSCO in the light of the decisions
taken in the State Investment Promotion Board, have decided to extend the
incentives that are considered for Pumped Storage Hydro Power Projects earlier
allotted to M/s. Adani Green Energy Ltd. Accordingly, Government hereby issue the
following orders:
i.Allotment of 2100 MW of Pumped Storage Hydro Power Project to M/s Shirdi
Sai Electrical Ltd. at Somasila, YSR District (900 MW) and Yerravaram, Alluri
Seetharama Raju District (1200 MW).
ii.Mega Industrial Project Status has been accorded to the project to facilitate
single window clearances. NREDCAP will be the Nodal Agency. However, no
incentives will be provided.
iii.For allotment and alienation of land required and available if any in the project
area for the project either on outright sale basis @ Rs. 5 lakhs per acre or on
lease basis with lease rentals of Rs.31,000/acre with an escalation of 5% for
every two years, based on the option of the Project developer.
iv.Allocation of water for initial filling and annual recouping towards evaporation
losses from the natural streams as per the prevailing guidelines of the Water
Resource Department as detailed below:
a. Somasila : 0.294 TMC of water for initial filling and 0.015 TMC of water
for annual recouping towards evaporation losses from the existing
Somasila Reservoir subject to subject to terms & conditions of Water
Resource (Reforms) Department and payment of water royalty charges
for Non-Consumptive / Consumptive utilization as fixed by the
Government from time to time as per the orders of the Government
vide G.O.Ms.No.64, dated.10.12.2021 of Water Resources (Reforms)
Department.
b. Yerravaram: Allocation of 0.553 TMC of water (for one-time filling) and
0.046 TMC (towards annual evaporation losses) every year from
Bodderu subject to the terms and conditions laid down in GO Ms No. 6
dated 18.01.2023 of Water Resources (Reforms) Department and
developer should abide by any other conditions laid by the Water
Resource Department / Govt. of AP at later date.
v.Green Energy Development Charges shall be levied @ Rs. 1 lakh/MW/Year
for 1st 25 years and Rs. 2 lakhs/MW/year for remaining life of the project.
vi.Registration charges @ Rs.50,000/- MW shall be paid to NREDCAP within
two (2) months from date of this order.
vii.Actual expenditure incurred by the NREDCAP in preparations of the DPRs
and carrying out various field investigations of the said PSP projects and
expenditure towards obtaining various clearances shall be reimbursed/ paid
Page 3 of 5File No.ENE01-APRE/8/2022-MLO-ENE-Part(1)
GO MS/4/2023/ENE01-Energy
by M/s. Shirdi Sai Electricals Ltd. as and when demand raised by the
NREDCAP.
viii.Govt. of A.P. will support and facilitate the project for availing grants of special
category projects under central govt. schemes.
ix.Govt.of A.P. will facilitate the project for availing benefits provided as per
National Energy Storage Policy without any financial commitment from Govt.
of A.P.
x.APTRANSCO shall facilitate for evacuation of power from the proposed PSP
Projects to the nearest CTU sub-stations. Necessary evacuation facility till the
nearest CTU shall be developed by M/s.Shirdi Sai Electricals Ltd.
xi.The Forest Department shall extend necessary support and facilitate to carry
out surveys and investigations in forest areas and diversion of forest lands.
xii.The Power generated from these pumped storage projects would be
connected to Power Grid / CTU substation and delivered outside the State
with no obligation for DISCOMS to purchase power. However, DISCOMs shall
have first right of refusal.
xiii.The allocated projects shall be executed and commissioned within a period of
Six (6) years from the date of total land handing over to the Project, failing
which the entire land shall be resumed back to the Government.
7. The Revenue Department/EFS & T/Industries & Commerce/Water Resources
Department/ Chairman & Managing Director, APTRANSCO, Vijayawada shall take
necessary action accordingly with respect to their issues mentioned at para 6 above.
8. The Vice Chairman & Managing Director, New and Renewable Energy
Development Corporation of Andhra Pradesh, Tadepalli shall take further necessary
action accordingly.
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH)
K.VIJAYANAND
SPECIAL CHIEF SECRETARY TO GOVERNMENT
To
M/s Shirdi Sai Electricals Ltd., Plot No. 13/82, 53-55 and 58-60, Industrial
Development Area, Kadapa, YSR District - 516002.
The VC& Managing Director, NREDCAP, Tadepalli.
The Chairman & Managing Director, APTRANSCO, VidyuthSoudha, Vijayawada.
The Chief Commissioner of Land Administration & Special Chief Secretary to
Government,APIIC Towers, Mangalagiri.
The Special Chief Secretary to Government, Revenue Department
The Special Chief Secretary to Government, Finance Department
The Special Chief Secretary, Industries & Commerce Department
The Special Chief Secretary to Government, EFS&T Department.
The Principal Secretary to Government, Water Resources Department.
The Principal Chief Conservator of Forests, GoAP, Guntur
The Collector & District Magistrate, YSR District.
The Collector & District Magistrate, Alluri Seetharama Raju District.
Page 4 of 5File No.ENE01-APRE/8/2022-MLO-ENE-Part(1)
GO MS/4/2023/ENE01-Energy
Copy to:
The Commissioner of Industries Department, Vijayawada.
The Managing Director, APGENCO, Gunadala, Vijayawada.
The Chairman & Managing Director, APSPDCL, Tirupathi.
The Chairman & Managing Director, APCPDCL, Vijayawada.
The Chairman & Managing Director, APEPDCL, Visakhapatnam.
The P.S to Special Chief Secretary to Chief Minister.
The P.S., to the Secretary to Chief Minister.
The P.S., to Minister for Energy, EFS & T and Mines & Geology.
The P.S., to the Special Chief Secretary to Government, Energy Department.
The Secretary, Ministry of New & Renewable Energy (MNRE), New Delhi.
The Secretary, Ministry of Power, New Delhi.
The G.A.(Cabinet) Department.
SF/SCs.
//FORWARDED BY ORDER//
SECTION OFFICER
Page 5 of 5