See Full Document Text
Registered No. HSE-49/2016
PART I EXTRAORDINARY
No.445 AMARAVATI, THURSDAY, MARCH 21, 2024 G.4148
NOTIFICATIONS BY GOVERNMENT
--x--File No.ENE01-APRE/16/2024-MLO-ENE
GO MS/18/2024/ENE01-Energy
GOVERNMENT OF ANDHRA PRADESH
ABSTRACT
Energy Department – Proposal for setting up of 171.60 MW Wind Power
Project by M/s. JSW Neo Energy Limited - Allotment of 171.60 MW Wind
Power Projects in Kurnool and Nandyal Districts – Orders – Issued.
= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =
ENERGY (POWER.II) DEPARTMENT
G.O.Ms.No.20 Dated:06.02.2024
Read the following:-
1. Proposal of M/s. JSW Energy vide Lr. No. JSWNEL / NREDCAP /
2023-24/004/Wind, dt: 22.01.2024.
2. From the Vice Chairman & Managing Director, New and Renewable
Energy Development Corporation of Andhra Pradesh (NREDCAP),
Lr.No.NREDCAP/WE/APREEP/171.60MW/2024, dt: 25.01.2024.
***
O R D E R:-
Government of Andhra Pradesh is giving priority for promotion of
Renewable Energy Power projects and has been rolling out multiple
initiatives, programs, policies and incentives to accelerate the development of
the renewable energy sector. The State is having good RE power potential
particularly in Rayalaseema region where huge extents of lands have been
identified for promotion of RE power projects by inviting private investments.
2. Further, the Government of India has committed at the 26th session of
the Conference of the Parties (COP26) to the United Nations Framework
Convention on Climate Change (UNFCCC) held in Glasgow, United Kingdom
to reach 500 GW Non-fossil energy capacity by 2030 and achieve the target
of net zero emissions by 2070.
3. Government of Andhra Pradesh has issued orders vide following G.Os
for large scale promotion of Wind Power, Solar Power and Wind-Solar hybrid
Power Projects:
1. AP Solar Power Policy - 2018 issued vide G.O.Ms.No.1, dt: 03.01.2019
2. AP Wind Power Policy - 2018 issued vide G.O.Ms.No:2,dt:03.01.2019
3. AP Wind Solar Hybrid Power Policy -2018 issued vide G.O.Ms.No.3,
dt:03.01.2019
4. Amendment order G.O.Ms.No.35, dt:18.11.2019 and G.O.Ms.No.1, dt:
01.03.2021.
5. AP RE Export Power Policy 2020 issued vide G.O.Ms.No.20, dt:
17.07.2020.
Page 1 of 5File No.ENE01-APRE/16/2024-MLO-ENE
GO MS/18/2024/ENE01-Energy
4. In the reference 1st read above, M/s. JSW Neo Energy Ltd., Mumbai,
have submitted proposal for allocation of 171.60 MW Wind Power Project at
the following locations:
a. Jaladurgam RF, Peapally Mandal, Kurnool District.-102.30 MW
b. Kunukuntla RF, Owk Mandal, Nandyal District - 69.30 MW
5. The proposal of M/s. JSW Neo Energy Ltd. has been placed before
State Investment Promotion Board (SIPB) meeting held on 30.01.2024. The
SIPB have taken the following decisions:
a. SIPB has agreed for allotment of 171.60 MW Wind Power capacities at
the following locations without overlapping with the areas allotted
already to other developers for RE power capacities and Wind Resource
Assessment Studies
i. Jaladurgam RF, Peapally Mandal, Kurnool District.
ii. Kunukuntla RF, Owk Mandal, Nandyal District
b. SIPB directed that the developer shall approach the Forest Department
for diversion of lands as per the FCA Rules as the proposed project
locations fall in forest areas.
c. SIPB has agreed to extend support from Local and State Level
Government Bodies for land registration and project execution through
Nodal Agency.
d. SIPB has agreed for facilitation for 400/220 KV Transmission Line
Corridor through APTRANSCO as per the prevailing regulations/
guidelines.
e. SIPB has agreed to extend incentives under AP RE Export Policy 2020.
f. SIPB has agreed to extend the single window facilitation as per the
prevailing policies through the Nodal Agency as per the AP RE Export
Policy 2020.
6. Government after detailed examination of the proposal of M/s. JSW
Neo Energy Ltd. in consultation with various stakeholders i.e, Revenue
Dept., EFS&T Dept. in the light of the decisions taken in the State
Investment Promotion Board, has further issued orders as follows:
i. Allotment of 171.60 MW Wind Power Projects in the following
locations:
a. Jaladurgam RF, Peapally Mandal, Kurnool District.
Page 2 of 5File No.ENE01-APRE/16/2024-MLO-ENE
GO MS/18/2024/ENE01-Energy
b. Kunukuntla RF, Owk Mandal, Nandyal District.
ii. The developer shall approach the Forest Department for diversion of
lands as per the FCA Rules as the proposed project locations fall in
forest areas.
iii. The nodal Agency shall ensure support from Local and State Level
Government Bodies for land registration and project execution
through Nodal Agency.
iv. APTRANSCO shall facilitate for construction of 400/220 KV
Transmission. Line Corridor by the developer as per the prevailing
regulations/ guidelines.
v. Extend incentives under AP RE Export Policy 2020.
vi. Extend the single window facilitation as per the prevailing policies
through the Nodal Agency i.e NREDCAP as per the AP RE Export
Policy 2020.
vii. Green Energy Development Charges shall be levied @
Rs.1,00,000 /MW/Year for the entire life of the project starting from
the date of commissioning of 1st phase of the project.
viii. Statutory fees as per the AP Wind Power Policy 2018 and AP RE
Export Power Policy 2020 shall be paid by the developer.
ix. Eligible grants if any from MNRE/ Central Government will be
considered for extending the same to the proposed solar power
projects as per the policies of Govt. of India without any financial
commitment from Govt. of Andhra Pradesh.
x. Connectivity of CTU/STU will be recommended duly fulfilling the
connectivity requirement of earlier sanctioned/agreements entered
with project developers.
xi. APTRANSCO shall facilitate for evacuation of power from the
proposed RE Power Projects to the nearest CTU sub-stations.
Necessary evacuation facility till the nearest CTU shall be developed
by M/s. JSW Neo Energy Ltd.
xii. The Power generated from these wind power projects would be
connected to Power Grid/CTU substations and delivered outside the
State with no obligation for DISCOMS to purchase power. However,
DISCOMs shall have first right of refusal.
xiii. The project shall be completed within 6 years from the date of this
Page 3 of 5File No.ENE01-APRE/16/2024-MLO-ENE
GO MS/18/2024/ENE01-Energy
order.
xiv. The NREDCAP shall ensure project commissioning by the company
within the committed timelines, no transfer of capacity sanction is
allowed until the project achieves its Commercial Operation Date
(COD), and NREDCAP shall not entertain any changes in any
manner without the prior permission of the competent authority.
7. The Revenue Department/EFS & T Dept./ Industries & Commerce
Dept./ APTRANSCO shall take necessary action accordingly pertains to their
issues.
8. The Vice Chairman & Managing Director, New and Renewable Energy
Development Corporation of Andhra Pradesh, Tadepalli shall take further
necessary action accordingly.
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH)
K. VIJAYANAND
SPECIAL CHIEF SECRETARY TO GOVERNMENT
To
M/s JSW Neo Energy Ltd., JSW Centre, Bandra Kurla Complex, Bandra
(East), Mumbai – 400 051.
The Vice Chairman & Managing Director, NREDCAP, Tadepalli.
The Chairman & Managing Director, APTRANSCO, Vidyuth Soudha,
Vijayawada.
The Chief Commissioner of Land Administration & Special Chief Secretary,
A.P, APIIC Towers, Mangalagiri.
The Special Chief Secretary to Government, Revenue Department.
The Special Chief Secretary to Government, Finance Department.
The Secretary to Govt., Industries & Commerce Department.
The Principal Secretary to Government, Water Resources. Department
The Principal Chief Conservator of Forests, GoAP, P.V.S.Land Mark,
Near APIIC Towers Mangalagiri, Guntur District.
The Collector & District Magistrate, Kurnool District.
The Collector & District Magistrate, Nandyal District.
Copy to:
The Commissioner of Industries Department, Vijayawada.
The Managing Director, APGENCO, Vidyuth Soudha, Gunadala,
Vijayawada.
The Chairman & Managing Director, APSPDCL, Tirupati.
The Chairman & Managing Director, APCPDCL, Vijayawada.
The Chairman & Managing Director, APEPDCL, Visakhapatnam.
The P.S to Special Chief Secretary to Chief Minister.
Page 4 of 5File No.ENE01-APRE/16/2024-MLO-ENE
GO MS/18/2024/ENE01-Energy
The P.S., to Minister for Energy, FES & T and Mines & Geology.
The P.S., to the Special Chief Secretary to Government, Energy Department.
The Secretary, Ministry of New & Renewable Energy (MNRE), GoI, New Delhi.
The Secretary, Ministry of Power, GoI, New Delhi.
G.A (Cabinet) Dept.,
SF/SCs.
//FORWARDED :: BY ORDER//
SECTION OFFICER