Home India ENERGY DEPT Gazette No 629: Energy department- APTRANSCO- Andhra Pradesh...
Date: 2023-08-16 Category: AP E-Gazette - Weekly / PART I State: Andhra Pradesh Country: India

Gazette No 629: Energy department- APTRANSCO- Andhra Pradesh State Load Dispatch Centre (SLDC) – Information Technology & Operational Technology (OT) systems Cyber Security - Critical Information Infrastructure (Cll)— Persons authorised for accessing the notified protected system (CII) of APSLDC- Orders- Issued.

Issued by ENERGY DEPT · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task
Official Source Record View Original Source →
See Full Document Text
Registered No. HSE-49/2016 W.No.32 AMARAVATI, WEDNESDAY, AUGUST 16, 2023 G.629 PART I - NOTIFICATIONS BY GOVERNMENT, HEADS OF DEPARTMENTS AND OTHER OFFICERS --x -- NOTIFICATIONS B Y GOVERNMENT ENERGY(POWER-I) DEPARTMENT Energy department- APTRANSCO- Andhra Pradesh State Load Dispatch Centre (SLDC) – Information Technology & Operational Technology (OT) systems Cyber Security - Critical Information Infrastructure (Cll)— Persons authorised for accessing the notified protected system (CII) of APSLDC- Orders- Issued. (G.O.Rt.No.80., Energy (Power.I) Dept., dated 31.07.2023) Read: From CMD,APTRANSCO, Vijayawada Lr.No. CMD/Dir(G&TM)CE(SLDC)/SE(GO) /EE(SCADA)/F.Cyber Security/D.No.28 dt. 08.06.2023. &&& O R D E R:- In the circumstances stated by the Chairman & Managing Director, Transmission Corporation of Andhra Pradesh Limited, Vijayawada in the reference read above, Government hereby order to publish the following Critical Information Infrastructure (Cll) and persons authorised for accessing the notified protected system (Cll) of Andhra Pradesh State Load Dispatch Centre (SLDC). l . Notified Critical Information Infrastructure (Cll):- a. Supervisory Control and Data Acquisition (SCADA) System. b. Unified Real Time Dynamic State Measurement (URTDSM) System.c. Supervisory Control and Data Acquisition (SCADA) System of Renewable Energy Management Centre (REMC). II. The following persons are authorised for accessing the notified protected system (Cll). i. Chief Engineer/APSLDC ii. Superintending Engineer/Grid Operations/APSLDC- CISO iii. Executive Engineer/SCADA/APSLDC iv. Deputy Executive Engineer/ Telecom/ SCADA / APSLDC- Alt. CISC) v. Deputy Executive Engineer-3/SCADA/APSLDC vi. Deputy Executive Engineer-I/ SCADA/ APSLDC vii. Deputy Executive Engineer/ ULDC/APSLDC viii. Executive Engineer/REMC/APSLDC ix. Deputy Executive Engineer/ REMC/APSLDC x. Assistant Executive Engineer - SCADA/APSLDC xi. Assistant Executive Engineer-2 / SCADA/APSLDC xii. Assistant Executive Engineer-3 / SCADA/APSLDC xiii. Assistant Executive Engineer-2/APSLDC 2. The Chairman & Managing Director, Transmission Corporation of Andhra Pradesh Limited, Vijayawada shall take further necessary action in the matter accordingly. K.VIJAYANAND SPECIAL CHIEF SECRETARY TO GOVERNMENT

Continue your research