## Report on Special Railway Project Notification
**1. Executive Summary:**
This report analyzes a notification from the Ministry of Railways, Government of India, declaring two specific railway projects in West Bengal as "special railway projects." The notification, S.O. 2680(E), is issued under the authority of the Railways Act of 1989. The core purpose is to expedite and potentially streamline the execution of these identified infrastructure improvements. The report details the projects, their location, and the implications of their designation as "special railway projects."
**2. Introduction:**
This report aims to provide an overview and analysis of the Ministry of Railways' notification, S.O. 2680(E), which designates two railway projects in West Bengal as special railway projects. The analysis is based solely on the content of the provided policy text.
**3. Policy Overview:**
* This is a *new policy* designating projects as "special railway projects" under the Railways Act, 1989.
* **Core Objective(s):** Based on the text, the primary objective is to officially classify specific railway projects as "special railway projects." The implicit goal is likely to facilitate faster approval and execution of these projects, potentially by streamlining regulatory processes or prioritizing resource allocation, in accordance with the Railways Act, 1989.
**4. Background and Rationale:**
Since this is a new designation policy, the likely underlying issue is the need to expedite crucial railway infrastructure projects. The designation of "special railway project" suggests a desire to prioritize these projects and potentially overcome bureaucratic hurdles that might otherwise delay their completion. The selection of these specific projects suggests their perceived importance to the railway network in West Bengal.
**5. Key Provisions / Changes:**
As a new policy notification, the key provisions are the specific projects designated as "special railway projects":
* **Project 1:** Construction of a 4-lane Road Over Bridge at level Crossing No. NN1-Manned at Km 223 between NJP-ABFC in West Bengal.
* **Project 2:** Replacement of existing level crossing Gate No. NC101 at Km 19.889 between station Bhaluka Road-Samsi in West Bengal with a Road Over Bridge.
The notification formally identifies these projects under the Railways Act, 1989, which grants the Central Government certain powers related to railway projects. This designation likely triggers specific provisions within the Railways Act that apply to "special railway projects," although these specific provisions are not detailed within the provided text.
**6. Target Audience and Stakeholders:**
The directly affected stakeholders include:
* **Northeast Frontier Railway:** As the responsible railway zone, they are directly tasked with the implementation of these projects.
* **Construction Companies/Contractors:** Those bidding for and executing the construction work on these projects.
* **Local Communities in West Bengal:** Particularly those residing near the project sites, who will experience construction-related disruptions but will eventually benefit from improved railway infrastructure.
* **Commuters and businesses utilizing the railway lines:** Benefit from the increased safety and efficiency.
**7. Implementation Aspects (Inferred):**
* **Responsible agency:** Northeast Frontier Railway, specifically indicated by the mention of the 'Ministry of Railways Northeast Frontier Railway'. Sanjeev Kumar Vij, Chief Project Manager Gatishakti Katihar, is named.
* **Timelines:** The notification takes effect from the date of its publication in the Official Gazette (June 16, 2025). Specific timelines for project completion are not provided in the text.
* **Procedures:** The notification itself does not specify procedures, but it implies that established procedures for "special railway projects" under the Railways Act, 1989, will be followed.
**8. Expected Outcomes / Impact of Changes:**
The intended outcomes of designating these projects as "special railway projects" are likely:
* **Expedited Project Completion:** The designation may facilitate faster approvals and resource allocation, leading to quicker completion of the road overbridges.
* **Improved Safety:** Replacing level crossings with overbridges significantly enhances safety for both railway and road traffic.
* **Reduced Congestion:** Overbridges eliminate delays caused by level crossings, improving traffic flow on both rail and road networks.
* **Enhanced Infrastructure:** Upgrading railway infrastructure contributes to overall economic development and improved transportation efficiency in the region.
**9. Conclusion:**
The Ministry of Railways' notification designates two railway projects in West Bengal as "special railway projects," marking a significant step towards improving railway infrastructure in the region. The construction of road overbridges at existing level crossings is expected to enhance safety, reduce congestion, and contribute to overall transportation efficiency. The designation as "special railway projects" suggests a prioritization of these projects and a commitment to their timely completion, potentially streamlining the approval and execution processes. The Railway Act of 1989 will guide the processes going forward.
Key Entities Referenced
Railways Act, 1989: A law that confers powers to the Central Government regarding railway projects. Specifically, clause 37A of Section 2 is mentioned.
Central Government: The governing authority that is issuing the notification regarding special railway projects.
Special Railway Project: A designation given to specific railway projects, as defined in the notification.
West Bengal: A state in India where the railway projects are located.
Construction of 4 lane Road Over Bridge At level Crossing No. NN1Manned: Name of the first special railway project mentioned in the table.
Replacement of existing level crossing Gate No. NC101: Name of the second special railway project mentioned in the table.
Sanjeev Kumar Vij: Chief Project ManagerGatishaktiKatihar
Northeast Frontier Railway: The railway zone or division under the Ministry of Railways issuing the notification.
Maligaon: Location of the Northeast Frontier Railway office.
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99
सी.जी.-ए.एस.-अ.-17062025-263911
CG-AxSx-xEG-1ID7H06xx2x0 25-263911
xxxGIDExxx
असाधारण
EXTRAORDINARY
भाग II—खण् ड 3—उप-खण्ड (ii)
PART II—Section 3—Sub-section (ii)
प्राजधकार स ेप्रकाजित
PUBLISHED BY AUTHORITY
स.ं 2615] नई कदलली, सोमर्वार, िनू 16, 2025/ज् यष्े ठ 26, 1947
No. 2615] NEW DELHI, MONDAY, JUNE 16, 2025/JYAISTHA 26, 1947
रेल मत्रं ालय
(पर्वू ोत्तर सीमातं रेलर्व)े
अजधसचू ना
मालीगांर्व, 10 िून, 2025
का.आ. 2680(अ).— रेलर्व ेअजधजनयम, 1989 (1989 का 24) की धारा 2 के खंड (37ए) द्वारा प्रदत्त िजियों का
प्रयोग करत े हुए, केन्द्र सरकार जनम्नजलजखत पररयोिनाओं को, नीचे दी गई ताजलका के कॉलम (2) में उजललजखत जर्विषे
रेलर्व े पररयोिना के रूप म,ें उि ताजलका के कॉलम (3) में उजललजखत राज्य म ेंआजधकाररक रािपत्र म ें इस अजधसूचना के
प्रकािन की तारीख से अजधसूजचत करती ह:ै
सारणी
जर्विषे रेल पररयोिना
क्रम स.ं जर्विषे रेलर्व ेपररयोिना का नाम राज्य/सघं राज्य क्षत्रे
(1) (2) (3)
1. एनिेपी-एबीएफसी के बीच ककमी-2/2-3 पर लेर्वल क्रॉससंग सख्ं या पजिम बंगाल
एनएन-1 (मानर्वयुि) पर 4 लने रोड ओर्वर जिि का जनमााण
3917 GI/2025 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
2. स्ट्टेिन भालुका रोड-समसी के बीच ककमी-198/8-9 पर मौिूदा पजिम बंगाल
लेर्वल क्रॉससंग गेट संख्या एनसी-101 को रोड ओर्वर जिि से
प्रजतस्ट्थाजपत करना
[फा. सं. िीएसय/ू एमआईएससी/2025/2]
संिीर्व कुमार जर्वि, मुख्य पररयोिना प्रबंधक/गजतिजि/करटहार
MINISTRY OF RAILWAYS
(Northeast Frointier Railway)
NOTIFICATION
Maligaon, the 10th June, 2025
S.O. 2680(E).— In exercise of the powers conferred by clause (37A) of Section 2 of the Railways Act, 1989
(24 of 1989), the Central Government hereby notifies the following projects as special railway project, as mentioned
in column (2) of the table below in the State mentioned in column (3) of the said table with effect from the date of
publication of these notification in the Official Gazette.
TABLE
Special Railway Project
Sl. No. Name of the Special Railway Project State/UT
(1) (2) (3)
1. Construction of 4 lane Road Over Bridge At level Crossing No. NN-1(Manned) West Bengal
at Km-2/2-3 in between NJP-ABFC
2. Replacement of existing level crossing Gate No. NC-101 At Km-198/8-9 West Bengal
between station Bhaluka Road-Samsi with Road Over Bridge
[F. No. GSU/MISC/2025/2]
SANJEEV KUMAR VIJ, Chief Project Manager/Gatishakti/Katihar
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.